# number_of_header_lines: 68 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: N2O CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: National Science Foundation [NSF] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: spo # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-07-24 11:40:09 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number SPO 1997 01 16 20 57 00 1629-91 S n2o CCGG 311.610 0.550 ... H4 1997 12 31 11 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128762 SPO 1997 01 16 20 57 00 1630-91 S n2o CCGG 310.720 0.550 N.. H4 1997 12 31 12 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128763 SPO 1997 01 16 23 02 00 1631-91 P n2o CCGG 310.430 0.550 N.. H4 1997 12 31 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128764 SPO 1997 01 16 23 02 00 1632-91 P n2o CCGG 312.010 0.550 ... H4 1997 12 31 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128765 SPO 1997 02 16 03 32 00 1635-91 P n2o CCGG 311.670 0.550 ... H4 1997 12 31 13 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128766 SPO 1997 02 16 03 32 00 1636-91 P n2o CCGG 312.210 0.550 ... H4 1997 12 31 13 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128767 SPO 1997 02 16 04 13 00 1633-91 S n2o CCGG 312.330 0.550 ... H4 1997 12 31 12 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128768 SPO 1997 02 16 04 13 00 1634-91 S n2o CCGG 312.010 0.550 ... H4 1997 12 31 12 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128769 SPO 1997 03 01 00 55 00 1627-91 S n2o CCGG 311.720 0.550 ... H4 1998 01 02 09 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128770 SPO 1997 03 01 00 55 00 1628-91 S n2o CCGG 312.920 0.550 N.. H4 1998 01 02 09 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128771 SPO 1997 03 01 01 09 00 1625-91 P n2o CCGG 312.190 0.550 ... H4 1998 01 02 11 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128772 SPO 1997 03 01 01 09 00 1626-91 P n2o CCGG 311.710 0.550 ... H4 1998 01 02 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128773 SPO 1997 03 07 22 53 00 727-91 S n2o CCGG 302.530 0.550 N.. H4 1998 01 02 10 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128774 SPO 1997 03 07 22 53 00 728-91 S n2o CCGG 310.350 0.550 N.. H4 1998 01 02 10 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128775 SPO 1997 03 15 02 54 00 1491-91 S n2o CCGG 311.950 0.550 ... H4 1998 01 02 09 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128776 SPO 1997 03 15 02 54 00 1492-91 S n2o CCGG 311.450 0.550 ... H4 1998 01 02 10 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128777 SPO 1997 03 15 03 10 00 1621-91 P n2o CCGG 311.160 0.550 N.. H4 1998 01 06 14 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128778 SPO 1997 03 15 03 10 00 1622-91 P n2o CCGG 312.570 0.550 N.. H4 1998 01 06 14 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128779 SPO 1997 03 21 03 00 00 1623-91 S n2o CCGG 309.990 0.550 N.. H4 1998 01 07 09 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128780 SPO 1997 03 21 03 00 00 1624-91 S n2o CCGG 309.320 0.550 N.. H4 1998 01 07 09 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128781 SPO 1997 03 28 01 54 00 1617-91 S n2o CCGG 309.300 0.550 N.. H4 1998 01 07 10 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128782 SPO 1997 03 28 01 54 00 1618-91 S n2o CCGG 308.070 0.550 N.. H4 1998 01 07 10 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128783 SPO 1997 04 01 21 58 00 1619-91 S n2o CCGG 312.500 0.550 ... H4 1998 01 07 09 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128784 SPO 1997 04 01 21 58 00 1620-91 S n2o CCGG 312.280 0.550 ... H4 1998 01 07 10 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128785 SPO 1997 04 02 00 03 00 1151-91 P n2o CCGG 311.950 0.550 ... H4 1997 12 29 15 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128786 SPO 1997 04 02 00 03 00 1152-91 P n2o CCGG 311.830 0.550 ... H4 1997 12 29 15 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128787 SPO 1997 04 11 02 56 00 557-91 S n2o CCGG 312.320 0.550 ... H4 1997 12 29 15 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128788 SPO 1997 04 11 02 56 00 558-91 S n2o CCGG 311.780 0.550 ... H4 1997 12 29 15 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128789 SPO 1997 04 15 03 52 00 1443-91 S n2o CCGG 311.520 0.550 ... H4 1997 12 29 12 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128790 SPO 1997 04 15 03 52 00 1444-91 S n2o CCGG 311.800 0.550 ... H4 1997 12 29 12 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128791 SPO 1997 04 15 05 10 00 447-91 P n2o CCGG 311.940 0.550 ... H4 1998 01 02 11 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128792 SPO 1997 04 15 05 10 00 448-91 P n2o CCGG 310.770 0.550 N.. H4 1998 01 02 12 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128793 SPO 1997 04 25 13 52 00 1745-91 S n2o CCGG 306.060 0.550 N.. H4 1998 01 02 13 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128794 SPO 1997 04 25 13 52 00 1746-91 S n2o CCGG 311.650 0.550 N.. H4 1998 01 02 13 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128795 SPO 1997 05 01 05 02 00 1453-91 S n2o CCGG 306.640 0.550 N.. H4 1998 01 05 12 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128796 SPO 1997 05 01 05 02 00 1454-91 S n2o CCGG 312.980 0.550 N.. H4 1998 01 05 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128797 SPO 1997 05 01 05 22 00 163-91 P n2o CCGG 312.830 0.550 N.. H4 1998 01 05 10 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128798 SPO 1997 05 01 05 22 00 164-91 P n2o CCGG 307.920 0.550 N.. H4 1998 01 05 10 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128799 SPO 1997 05 10 23 58 00 1511-91 S n2o CCGG 306.490 0.550 N.. H4 1998 01 02 12 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128800 SPO 1997 05 10 23 58 00 1512-91 S n2o CCGG 306.480 0.550 N.. H4 1998 01 02 12 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128801 SPO 1997 05 15 03 55 00 45-91 S n2o CCGG 309.920 0.550 N.. H4 1998 01 02 10 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128802 SPO 1997 05 15 03 55 00 46-91 S n2o CCGG 303.500 0.550 N.. H4 1998 01 02 11 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128803 SPO 1997 05 15 05 40 00 101-91 P n2o CCGG 311.780 0.550 ... H4 1998 01 05 11 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128804 SPO 1997 05 15 05 40 00 102-91 P n2o CCGG 311.440 0.550 ... H4 1998 01 05 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128805 SPO 1997 05 24 15 56 00 4079-91 S n2o CCGG 311.630 0.550 ... H4 1998 01 05 11 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128806 SPO 1997 05 24 15 56 00 4080-91 S n2o CCGG 312.200 0.550 ... H4 1998 01 05 11 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128807 SPO 1997 06 01 22 58 00 1573-91 S n2o CCGG 311.870 0.550 ... H4 1998 01 02 13 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128808 SPO 1997 06 01 22 58 00 1574-91 S n2o CCGG 311.470 0.550 ... H4 1998 01 02 13 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128809 SPO 1997 06 02 00 04 00 1845-91 P n2o CCGG 308.430 0.550 N.. H4 1998 01 05 09 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128810 SPO 1997 06 02 00 04 00 1846-91 P n2o CCGG 309.380 0.550 N.. H4 1998 01 05 10 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128811 SPO 1997 06 06 03 54 00 1461-91 S n2o CCGG 309.540 0.550 N.. H4 1998 01 05 09 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128812 SPO 1997 06 06 03 54 00 1462-91 S n2o CCGG 311.110 0.550 ... H4 1998 01 05 09 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128813 SPO 1997 06 15 13 52 00 1329-91 P n2o CCGG 308.960 0.550 N.. H4 1998 01 05 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128814 SPO 1997 06 15 13 52 00 1330-91 P n2o CCGG 311.930 0.550 ... H4 1998 01 05 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128815 SPO 1997 06 15 15 58 00 1371-91 S n2o CCGG 309.340 0.550 N.. H4 1998 01 05 10 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128816 SPO 1997 06 15 15 58 00 1372-91 S n2o CCGG 312.100 0.550 ... H4 1998 01 05 10 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128817 SPO 1997 06 21 15 56 00 1137-91 S n2o CCGG 312.310 0.550 ... H4 1998 01 05 14 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128818 SPO 1997 06 21 15 56 00 1138-91 S n2o CCGG 312.410 0.550 ... H4 1998 01 05 14 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128819 SPO 1997 07 01 02 59 00 171-91 S n2o CCGG 311.810 0.550 ... H4 1998 01 05 15 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128820 SPO 1997 07 01 02 59 00 172-91 S n2o CCGG 312.350 0.550 ... H4 1998 01 05 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128821 SPO 1997 07 01 04 12 00 1319-91 P n2o CCGG 311.570 0.550 ... H4 1998 01 05 14 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128822 SPO 1997 07 01 04 12 00 1320-91 P n2o CCGG 311.680 0.550 ... H4 1998 01 05 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128823 SPO 1997 07 12 04 55 00 4095-91 S n2o CCGG 311.320 0.550 ... H4 1997 12 19 16 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128824 SPO 1997 07 12 04 55 00 4096-91 S n2o CCGG 309.660 0.550 N.. H4 1997 12 19 16 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128825 SPO 1997 07 15 03 57 00 4097-91 S n2o CCGG 311.550 0.550 ... H4 1997 12 19 15 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128826 SPO 1997 07 15 03 57 00 4098-91 S n2o CCGG 306.690 0.550 N.. H4 1997 12 19 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128827 SPO 1997 07 15 04 28 00 4065-91 P n2o CCGG 311.510 0.550 ... H4 1997 12 17 12 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128828 SPO 1997 07 15 04 28 00 4066-91 P n2o CCGG 311.730 0.550 ... H4 1997 12 17 12 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128829 SPO 1997 07 25 02 55 00 313-91 S n2o CCGG 311.870 0.550 ... H4 1997 12 17 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128830 SPO 1997 07 25 02 55 00 314-91 S n2o CCGG 309.600 0.550 A.. H4 1997 12 17 13 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128831 SPO 1997 08 01 22 25 00 4093-91 S n2o CCGG 306.270 0.550 N.. H4 1997 12 31 09 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128832 SPO 1997 08 01 22 25 00 4094-91 S n2o CCGG 311.910 0.550 ... H4 1997 12 31 10 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128833 SPO 1997 08 01 23 49 00 4091-91 P n2o CCGG 308.110 0.550 N.. H4 1997 12 31 10 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128834 SPO 1997 08 01 23 49 00 4092-91 P n2o CCGG 311.000 0.550 N.. H4 1997 12 31 10 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128835 SPO 1997 08 08 04 02 00 4051-91 S n2o CCGG 311.350 0.550 ... H4 1997 12 24 11 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128836 SPO 1997 08 08 04 02 00 4052-91 S n2o CCGG 311.570 0.550 ... H4 1997 12 24 11 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128837 SPO 1997 08 15 02 52 00 4081-91 P n2o CCGG 312.440 0.550 ... H4 1997 12 24 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128838 SPO 1997 08 15 02 52 00 4082-91 P n2o CCGG 312.160 0.550 ... H4 1997 12 24 12 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128839 SPO 1997 08 15 05 01 00 103-91 S n2o CCGG 312.330 0.550 ... H4 1997 12 30 16 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128840 SPO 1997 08 15 05 01 00 104-91 S n2o CCGG 312.210 0.550 ... H4 1997 12 30 16 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128841 SPO 1997 08 23 03 59 00 325-91 S n2o CCGG 312.090 0.550 ... H4 1997 12 31 09 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128842 SPO 1997 08 23 03 59 00 326-91 S n2o CCGG 312.300 0.550 ... H4 1997 12 31 09 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128843 SPO 1997 08 30 07 58 00 1167-91 S n2o CCGG 312.660 0.550 ... H4 1997 12 19 16 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128844 SPO 1997 08 30 07 58 00 1168-91 S n2o CCGG 312.120 0.550 ... H4 1997 12 19 16 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128845 SPO 1997 09 01 22 54 00 1813-91 S n2o CCGG 311.850 0.550 ... H4 1997 12 24 11 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128846 SPO 1997 09 01 22 54 00 1814-91 S n2o CCGG 312.590 0.550 ... H4 1997 12 24 11 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128847 SPO 1997 09 01 23 51 00 647-91 P n2o CCGG 312.050 0.550 ... H4 1997 12 19 15 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128848 SPO 1997 09 01 23 51 00 648-91 P n2o CCGG 311.800 0.550 ... H4 1997 12 19 16 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128849 SPO 1997 09 12 04 52 00 819-91 S n2o CCGG 305.000 0.550 N.. H4 1997 12 24 10 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128850 SPO 1997 09 12 04 52 00 820-91 S n2o CCGG 312.590 0.550 ... H4 1997 12 24 10 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128851 SPO 1997 09 15 20 00 00 1323-91 S n2o CCGG 313.420 0.550 ... H4 1997 12 30 12 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128852 SPO 1997 09 15 20 00 00 1324-91 S n2o CCGG 312.460 0.550 ... H4 1997 12 30 12 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128853 SPO 1997 09 15 21 51 00 4101-91 P n2o CCGG 311.760 0.550 ... H4 1997 12 17 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128854 SPO 1997 09 15 21 51 00 4102-91 P n2o CCGG 312.400 0.550 ... H4 1997 12 17 14 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128855 SPO 1997 09 26 01 59 00 1917-91 S n2o CCGG 312.380 0.550 ... H4 1997 12 30 14 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128856 SPO 1997 09 26 01 59 00 1918-91 S n2o CCGG 312.350 0.550 ... H4 1997 12 30 14 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128857 SPO 1997 10 04 05 59 00 4103-91 S n2o CCGG 309.460 0.550 N.. H4 1997 12 17 13 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128858 SPO 1997 10 04 05 59 00 4104-91 S n2o CCGG 311.960 0.550 ... H4 1997 12 17 13 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128859 SPO 1997 10 04 06 46 00 4089-91 P n2o CCGG 312.140 0.550 ... H4 1998 01 02 12 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128860 SPO 1997 10 04 06 46 00 4090-91 P n2o CCGG 312.430 0.550 ... H4 1998 01 02 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128861 SPO 1997 10 10 21 59 00 1439-91 S n2o CCGG 312.320 0.550 ... H4 1997 12 30 12 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128862 SPO 1997 10 10 21 59 00 1440-91 S n2o CCGG 311.750 0.550 ... H4 1997 12 30 13 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128863 SPO 1997 10 15 02 58 00 4087-91 S n2o CCGG 302.560 0.550 N.. H4 1998 01 02 14 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128864 SPO 1997 10 15 02 58 00 4088-91 S n2o CCGG 311.970 0.550 ... H4 1998 01 02 14 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128865 SPO 1997 10 15 03 48 00 4099-91 P n2o CCGG 312.660 0.550 ... H4 1997 12 30 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128866 SPO 1997 10 15 03 48 00 4100-91 P n2o CCGG 312.480 0.550 ... H4 1997 12 30 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128867 SPO 1997 10 26 21 54 00 4085-91 S n2o CCGG 312.500 0.550 ... H4 1998 01 02 14 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128868 SPO 1997 10 26 21 54 00 4086-91 S n2o CCGG 312.330 0.550 ... H4 1998 01 02 14 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128869 SPO 1997 11 09 23 05 00 4083-91 S n2o CCGG 312.390 0.550 ... H4 1998 01 02 14 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128870 SPO 1997 11 09 23 05 00 4084-91 S n2o CCGG 312.300 0.550 ... H4 1998 01 02 15 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128871 SPO 1997 11 09 23 36 00 1791-91 P n2o CCGG 312.050 0.550 ... H4 1998 01 26 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128872 SPO 1997 11 09 23 36 00 1792-91 P n2o CCGG 312.260 0.550 ... H4 1998 01 26 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128873 SPO 1997 11 15 00 55 00 1789-91 S n2o CCGG 312.440 0.550 ... H4 1998 01 26 15 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128874 SPO 1997 11 15 00 55 00 1790-91 S n2o CCGG 312.390 0.550 ... H4 1998 01 26 16 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128875 SPO 1997 11 15 03 01 00 25-91 P n2o CCGG 312.310 0.550 ... H4 1998 01 27 11 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128876 SPO 1997 11 15 03 01 00 26-91 P n2o CCGG 312.040 0.550 ... H4 1998 01 27 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128877 SPO 1997 11 22 03 18 00 279-91 S n2o CCGG 312.870 0.550 ... H4 1998 01 27 10 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128878 SPO 1997 11 22 03 18 00 280-91 S n2o CCGG 312.500 0.550 ... H4 1998 01 27 11 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128879 SPO 1997 12 01 19 53 00 4075-91 S n2o CCGG 313.070 0.550 ... H4 1998 01 27 09 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128880 SPO 1997 12 01 19 53 00 4076-91 S n2o CCGG 312.740 0.550 ... H4 1998 01 27 09 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128881 SPO 1997 12 01 23 57 00 4071-91 P n2o CCGG 312.950 0.550 ... H4 1998 01 27 09 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128882 SPO 1997 12 01 23 57 00 4072-91 P n2o CCGG 312.480 0.550 ... H4 1998 01 27 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128883 SPO 1997 12 08 23 53 00 4077-91 S n2o CCGG 313.060 0.550 ... H4 1998 01 26 14 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128884 SPO 1997 12 08 23 53 00 4078-91 S n2o CCGG 312.870 0.550 ... H4 1998 01 26 14 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128885 SPO 1997 12 15 04 54 00 4073-91 S n2o CCGG 312.430 0.550 ... H4 1998 01 26 15 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128886 SPO 1997 12 15 04 54 00 4074-91 S n2o CCGG 312.610 0.550 ... H4 1998 01 26 15 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128887 SPO 1997 12 15 19 46 00 677-91 P n2o CCGG 312.800 0.550 ... H4 1998 02 13 09 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128888 SPO 1997 12 15 19 46 00 678-91 P n2o CCGG 312.410 0.550 ... H4 1998 02 13 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128889 SPO 1997 12 23 03 55 00 65-91 S n2o CCGG 312.450 0.550 ... H4 1998 02 13 10 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128890 SPO 1997 12 23 03 55 00 66-91 S n2o CCGG 312.850 0.550 ... H4 1998 02 13 10 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128891 SPO 1998 01 01 22 54 00 661-91 S n2o CCGG 312.720 0.550 ... H4 1998 02 13 10 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128892 SPO 1998 01 01 22 54 00 662-91 S n2o CCGG 313.110 0.550 ... H4 1998 02 13 10 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128893 SPO 1998 01 01 23 48 00 751-91 P n2o CCGG 313.040 0.550 ... H4 1998 02 12 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128894 SPO 1998 01 01 23 48 00 752-91 P n2o CCGG 312.650 0.550 ... H4 1998 02 12 15 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128895 SPO 1998 01 10 02 27 00 825-91 P n2o CCGG 312.650 0.550 ... H4 1998 02 12 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128896 SPO 1998 01 10 02 27 00 826-91 P n2o CCGG 312.240 0.550 ... H4 1998 02 12 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128897 SPO 1998 01 15 02 56 00 1177-91 S n2o CCGG 312.570 0.550 ... H4 1998 02 12 16 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128898 SPO 1998 01 15 02 56 00 1178-91 S n2o CCGG 312.830 0.550 ... H4 1998 02 12 16 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128899 SPO 1998 01 15 05 56 00 379-91 P n2o CCGG 312.470 0.550 ... H4 1998 02 12 13 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128900 SPO 1998 01 15 05 56 00 380-91 P n2o CCGG 312.380 0.550 ... H4 1998 02 12 13 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128901 SPO 1998 01 22 02 15 00 749-91 P n2o CCGG 313.180 0.550 ... H4 1998 03 05 13 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128902 SPO 1998 01 22 02 15 00 750-91 P n2o CCGG 312.100 0.550 ... H4 1998 03 05 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128903 SPO 1998 02 01 22 52 00 1215-91 S n2o CCGG 312.750 0.550 ... H4 1998 03 05 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128904 SPO 1998 02 01 22 52 00 1216-91 S n2o CCGG 312.330 0.550 ... H4 1998 03 05 15 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128905 SPO 1998 02 01 23 53 00 4115-91 P n2o CCGG 312.440 0.550 ... H4 1998 03 17 09 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128906 SPO 1998 02 01 23 53 00 4116-91 P n2o CCGG 312.170 0.550 ... H4 1998 03 17 09 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128907 SPO 1998 02 08 12 21 00 4113-91 P n2o CCGG 312.470 0.550 ... H4 1998 03 17 09 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128908 SPO 1998 02 08 12 21 00 4114-91 P n2o CCGG 312.420 0.550 ... H4 1998 03 17 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128909 SPO 1998 02 13 02 15 00 4109-91 P n2o CCGG 312.230 0.550 ... H4 1998 12 22 16 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128910 SPO 1998 02 13 02 15 00 4110-91 P n2o CCGG 312.060 0.550 ... H4 1998 12 22 16 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128911 SPO 1998 02 16 23 58 00 4105-91 P n2o CCGG 312.460 0.550 ... H4 1998 12 22 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128912 SPO 1998 02 16 23 58 00 4106-91 P n2o CCGG 312.460 0.550 ... H4 1998 12 22 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128913 SPO 1998 02 24 22 26 00 4107-91 P n2o CCGG 311.930 0.550 ... H4 1998 12 23 09 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128914 SPO 1998 02 24 22 26 00 4108-91 P n2o CCGG 312.410 0.550 ... H4 1998 12 23 09 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128915 SPO 1998 03 01 23 50 00 273-91 S n2o CCGG 312.530 0.550 ... H4 1998 12 23 09 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128916 SPO 1998 03 01 23 50 00 274-91 S n2o CCGG 312.710 0.550 ... H4 1998 12 23 10 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128917 SPO 1998 03 01 23 58 00 4111-91 P n2o CCGG 312.310 0.550 ... H4 1999 01 07 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128918 SPO 1998 03 01 23 58 00 4112-91 P n2o CCGG 312.100 0.550 ... H4 1999 01 07 13 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128919 SPO 1998 03 08 23 20 00 1821-91 P n2o CCGG 312.330 0.550 ... H4 1999 01 07 12 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128920 SPO 1998 03 08 23 20 00 1822-91 P n2o CCGG 313.000 0.550 ... H4 1999 01 07 12 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128921 SPO 1998 03 15 04 51 00 119-91 S n2o CCGG 309.560 0.550 N.. H4 1998 12 29 09 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128922 SPO 1998 03 15 04 51 00 120-91 S n2o CCGG 312.610 0.550 ... H4 1998 12 29 09 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128923 SPO 1998 03 15 06 08 00 1297-91 P n2o CCGG 312.100 0.550 ... H4 1998 12 28 17 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128924 SPO 1998 03 15 06 08 00 1298-91 P n2o CCGG 312.900 0.550 ... H4 1998 12 28 17 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128925 SPO 1998 03 23 02 50 00 761-91 P n2o CCGG 307.900 0.550 N.. H4 1998 12 28 16 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128926 SPO 1998 03 23 02 50 00 762-91 P n2o CCGG 307.240 0.550 N.. H4 1998 12 28 16 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128927 SPO 1998 04 01 21 53 00 637-91 S n2o CCGG 310.050 0.550 N.. H4 1998 12 28 16 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128928 SPO 1998 04 01 21 53 00 638-91 S n2o CCGG 312.150 0.550 ... H4 1998 12 28 16 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128929 SPO 1998 04 01 23 56 00 111-91 P n2o CCGG 309.920 0.550 N.. H4 1999 01 07 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128930 SPO 1998 04 01 23 56 00 112-91 P n2o CCGG 312.070 0.550 ... H4 1999 01 07 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128931 SPO 1998 04 08 23 30 00 319-91 P n2o CCGG 312.460 0.550 ... H4 1999 01 07 13 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128932 SPO 1998 04 08 23 30 00 320-91 P n2o CCGG 312.160 0.550 ... H4 1999 01 07 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128933 SPO 1998 04 15 21 56 00 4063-91 S n2o CCGG 312.330 0.550 ... H4 1998 12 23 16 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128934 SPO 1998 04 15 21 56 00 4064-91 S n2o CCGG 311.020 0.550 N.. H4 1998 12 23 16 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128935 SPO 1998 04 15 23 55 00 4061-91 P n2o CCGG 310.860 0.550 N.. H4 1998 12 23 16 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128936 SPO 1998 04 15 23 55 00 4062-91 P n2o CCGG 311.840 0.550 ... H4 1998 12 23 16 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128937 SPO 1998 04 22 23 45 00 4059-91 P n2o CCGG 311.170 0.550 N.. H4 1998 12 22 14 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128938 SPO 1998 04 22 23 45 00 4060-91 P n2o CCGG 312.140 0.550 ... H4 1998 12 22 14 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128939 SPO 1998 05 05 20 52 00 4067-91 S n2o CCGG 312.170 0.550 ... H4 1998 12 22 14 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128940 SPO 1998 05 05 20 52 00 4068-91 S n2o CCGG 314.680 0.550 N.. H4 1998 12 22 15 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128941 SPO 1998 05 05 23 25 00 4047-91 P n2o CCGG 311.940 0.550 ... H4 1998 12 24 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128942 SPO 1998 05 05 23 25 00 4048-91 P n2o CCGG 309.980 0.550 N.. H4 1998 12 24 10 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128943 SPO 1998 05 08 15 20 00 4049-91 P n2o CCGG 313.970 0.550 N.. H4 1998 12 23 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128944 SPO 1998 05 15 00 46 00 4069-91 P n2o CCGG 310.920 0.550 N.. H4 1998 12 22 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128945 SPO 1998 05 15 00 46 00 4070-91 P n2o CCGG 312.300 0.550 ... H4 1998 12 22 14 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128946 SPO 1998 05 15 09 59 00 4053-91 S n2o CCGG 312.300 0.550 ... H4 1998 12 22 15 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128947 SPO 1998 05 15 09 59 00 4054-91 S n2o CCGG 312.450 0.550 ... H4 1998 12 22 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128948 SPO 1998 05 23 06 59 00 4739-91 P n2o CCGG 311.600 0.550 N.. H4 1999 01 08 15 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128949 SPO 1998 05 23 06 59 00 4740-91 P n2o CCGG 312.490 0.550 ... H4 1999 01 08 15 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128950 SPO 1998 06 01 15 55 00 1205-91 S n2o CCGG 312.190 0.550 ... H4 1999 01 07 16 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128951 SPO 1998 06 01 15 55 00 1206-91 S n2o CCGG 312.430 0.550 ... H4 1999 01 07 17 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128952 SPO 1998 06 01 18 36 00 1593-91 P n2o CCGG 312.250 0.550 ... H4 1999 01 07 16 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128953 SPO 1998 06 01 18 36 00 1594-91 P n2o CCGG 311.890 0.550 ... H4 1999 01 07 16 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128954 SPO 1998 06 08 18 19 00 1669-91 P n2o CCGG 312.700 0.550 ... H4 1999 01 07 15 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128955 SPO 1998 06 08 18 19 00 1670-91 P n2o CCGG 307.780 0.550 N.. H4 1999 01 07 16 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128956 SPO 1998 06 16 17 56 00 1373-91 S n2o CCGG 308.320 0.550 N.. H4 1999 01 06 10 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128957 SPO 1998 06 16 17 56 00 1374-91 S n2o CCGG 312.740 0.550 ... H4 1999 01 06 10 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128958 SPO 1998 06 16 20 12 00 1477-91 P n2o CCGG 309.250 0.550 N.. H4 1999 01 08 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128959 SPO 1998 06 16 20 12 00 1478-91 P n2o CCGG 312.210 0.550 ... H4 1999 01 08 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128960 SPO 1998 06 24 00 40 00 1139-91 P n2o CCGG 312.630 0.550 ... H4 1999 01 06 09 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128961 SPO 1998 06 24 00 40 00 1140-91 P n2o CCGG 312.560 0.550 ... H4 1999 01 06 09 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128962 SPO 1998 07 01 03 57 00 129-91 S n2o CCGG 309.160 0.550 N.. H4 1999 01 06 09 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128963 SPO 1998 07 01 03 57 00 130-91 S n2o CCGG 312.650 0.550 ... H4 1999 01 06 09 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128964 SPO 1998 07 01 05 48 00 4587-91 P n2o CCGG 312.300 0.550 ... H4 1998 12 23 13 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128965 SPO 1998 07 01 05 48 00 4588-91 P n2o CCGG 312.500 0.550 ... H4 1998 12 23 13 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128966 SPO 1998 07 09 14 46 00 1993-91 P n2o CCGG 312.180 0.550 ... H4 1998 12 23 10 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128967 SPO 1998 07 09 14 46 00 1994-91 P n2o CCGG 310.010 0.550 N.. H4 1998 12 23 11 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128968 SPO 1998 07 15 10 18 00 1353-91 S n2o CCGG 313.690 0.550 ... H4 1999 01 07 12 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128969 SPO 1998 07 15 10 18 00 1354-91 S n2o CCGG 312.760 0.550 ... H4 1999 01 07 12 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128970 SPO 1998 07 15 12 42 00 4559-91 P n2o CCGG 312.220 0.550 ... H4 1999 01 07 11 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128971 SPO 1998 07 15 12 42 00 4560-91 P n2o CCGG 312.580 0.550 ... H4 1999 01 07 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128972 SPO 1998 07 23 21 12 00 1955-91 P n2o CCGG 312.620 0.550 ... H4 1999 01 07 10 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128973 SPO 1998 07 23 21 12 00 1956-91 P n2o CCGG 314.480 0.550 A.. H4 1999 01 07 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128974 SPO 1998 07 28 14 30 00 283-91 P n2o CCGG 312.240 0.550 ... H4 1999 01 06 12 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128975 SPO 1998 07 28 14 30 00 284-91 P n2o CCGG 312.290 0.550 ... H4 1999 01 06 13 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128976 SPO 1998 08 01 05 36 00 4231-91 S n2o CCGG 313.010 0.550 ... H4 1998 12 23 11 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128977 SPO 1998 08 01 05 36 00 4232-91 S n2o CCGG 313.050 0.550 ... H4 1998 12 23 11 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128978 SPO 1998 08 01 10 14 00 1291-91 P n2o CCGG 312.850 0.550 ... H4 1998 12 23 10 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128979 SPO 1998 08 01 10 14 00 1292-91 P n2o CCGG 312.400 0.550 ... H4 1998 12 23 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128980 SPO 1998 08 11 22 15 00 237-91 P n2o CCGG 313.350 0.550 ... H4 1999 01 07 10 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128981 SPO 1998 08 11 22 15 00 238-91 P n2o CCGG 313.170 0.550 ... H4 1999 01 07 10 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128982 SPO 1998 08 17 21 59 00 529-91 S n2o CCGG 313.130 0.550 ... H4 1999 01 07 09 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128983 SPO 1998 08 17 21 59 00 530-91 S n2o CCGG 312.710 0.550 ... H4 1999 01 07 09 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128984 SPO 1998 08 17 23 35 00 1781-91 P n2o CCGG 313.100 0.550 ... H4 1999 01 06 11 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128985 SPO 1998 08 17 23 35 00 1782-91 P n2o CCGG 313.490 0.550 ... H4 1999 01 06 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128986 SPO 1998 08 25 23 55 00 827-91 P n2o CCGG 306.440 0.550 N.. H4 1999 01 06 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128987 SPO 1998 08 25 23 55 00 828-91 P n2o CCGG 312.010 0.550 N.. H4 1999 01 06 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128988 SPO 1998 09 02 22 35 00 1975-91 S n2o CCGG 313.010 0.550 ... H4 1999 01 06 11 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128989 SPO 1998 09 02 22 35 00 1976-91 S n2o CCGG 313.540 0.550 ... H4 1999 01 06 11 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128990 SPO 1998 09 02 23 44 00 503-91 P n2o CCGG 313.240 0.550 ... H4 1999 01 06 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128991 SPO 1998 09 02 23 44 00 504-91 P n2o CCGG 312.830 0.550 ... H4 1999 01 06 10 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128992 SPO 1998 09 08 10 11 00 1919-91 P n2o CCGG 312.160 0.550 ... H4 1999 01 07 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128993 SPO 1998 09 08 10 11 00 1920-91 P n2o CCGG 312.990 0.550 ... H4 1999 01 07 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128994 SPO 1998 09 16 03 09 00 4227-91 P n2o CCGG 313.440 0.550 ... H4 1998 12 16 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128995 SPO 1998 09 16 03 09 00 4228-91 P n2o CCGG 312.560 0.550 ... H4 1998 12 16 10 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128996 SPO 1998 09 16 11 27 00 619-91 S n2o CCGG 305.550 0.550 N.. H4 1999 01 06 16 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128997 SPO 1998 09 16 11 27 00 620-91 S n2o CCGG 306.240 0.550 N.. H4 1999 01 06 16 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 128998 SPO 1998 09 24 18 00 00 4759-91 P n2o CCGG 312.650 0.550 ... H4 1998 12 16 10 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 128999 SPO 1998 09 24 18 00 00 4760-91 P n2o CCGG 313.110 0.550 ... H4 1998 12 16 10 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129000 SPO 1998 10 01 01 46 00 4437-91 P n2o CCGG 313.340 0.550 ... H4 1998 12 16 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129001 SPO 1998 10 01 01 46 00 4438-91 P n2o CCGG 312.490 0.550 ... H4 1998 12 16 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129002 SPO 1998 10 01 02 00 00 1599-91 S n2o CCGG 313.150 0.550 ... H4 1998 12 16 11 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129003 SPO 1998 10 01 02 00 00 1600-91 S n2o CCGG 313.380 0.550 ... H4 1998 12 16 11 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129004 SPO 1998 10 09 23 55 00 765-91 P n2o CCGG 312.900 0.550 ... H4 1998 12 16 12 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129005 SPO 1998 10 09 23 55 00 766-91 P n2o CCGG 313.180 0.550 ... H4 1998 12 16 12 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129006 SPO 1998 10 15 19 33 00 763-91 S n2o CCGG 313.210 0.550 ... H4 1998 12 16 11 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129007 SPO 1998 10 15 19 33 00 764-91 S n2o CCGG 312.700 0.550 ... H4 1998 12 16 11 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129008 SPO 1998 10 15 21 49 00 1447-91 P n2o CCGG 313.030 0.550 ... H4 1998 12 16 09 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129009 SPO 1998 10 15 21 49 00 1448-91 P n2o CCGG 312.880 0.550 ... H4 1998 12 16 09 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129010 SPO 1998 10 25 03 52 00 207-91 P n2o CCGG 312.950 0.550 ... H4 1998 12 16 09 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129011 SPO 1998 10 25 03 52 00 208-91 P n2o CCGG 313.210 0.550 ... H4 1998 12 16 09 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129012 SPO 1998 11 01 02 06 00 465-91 S n2o CCGG 313.380 0.550 ... H4 1999 01 06 14 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129013 SPO 1998 11 01 02 06 00 466-91 S n2o CCGG 313.400 0.550 ... H4 1999 01 06 14 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129014 SPO 1998 11 01 04 45 00 4249-91 P n2o CCGG 312.520 0.550 ... H4 1999 01 06 15 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129015 SPO 1998 11 01 04 45 00 4250-91 P n2o CCGG 312.770 0.550 ... H4 1999 01 06 15 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129016 SPO 1998 11 06 21 30 00 675-91 P n2o CCGG 312.840 0.550 ... H4 1998 12 28 09 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129017 SPO 1998 11 06 21 30 00 676-91 P n2o CCGG 312.630 0.550 ... H4 1998 12 28 09 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129018 SPO 1998 11 16 21 25 00 4331-91 S n2o CCGG 313.670 0.550 ... H4 1999 01 06 13 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129019 SPO 1998 11 16 21 25 00 4332-91 S n2o CCGG 313.630 0.550 ... H4 1999 01 06 13 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129020 SPO 1998 11 16 23 19 00 4253-91 P n2o CCGG 313.550 0.550 ... H4 1998 12 28 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129021 SPO 1998 11 16 23 19 00 4254-91 P n2o CCGG 313.100 0.550 ... H4 1998 12 28 10 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129022 SPO 1998 11 21 03 40 00 1689-91 P n2o CCGG 313.370 0.550 ... H4 1998 12 28 09 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129023 SPO 1998 11 21 03 40 00 1690-91 P n2o CCGG 313.790 0.550 ... H4 1998 12 28 09 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129024 SPO 1998 11 29 04 10 00 771-91 S n2o CCGG 313.370 0.550 ... H4 1999 01 06 14 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129025 SPO 1998 11 29 04 10 00 772-91 S n2o CCGG 313.010 0.550 ... H4 1999 01 06 15 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129026 SPO 1998 11 30 02 23 00 1275-91 S n2o CCGG 313.290 0.550 ... H4 1999 01 06 15 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129027 SPO 1998 11 30 02 23 00 1276-91 S n2o CCGG 313.240 0.550 ... H4 1999 01 06 15 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129028 SPO 1998 11 30 04 36 00 4305-91 P n2o CCGG 313.220 0.550 ... H4 1999 02 05 14 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129029 SPO 1998 11 30 04 36 00 4306-91 P n2o CCGG 313.360 0.550 ... H4 1999 02 05 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129030 SPO 1998 12 07 23 12 00 197-91 P n2o CCGG 314.310 0.550 ... H4 1999 02 05 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129031 SPO 1998 12 07 23 12 00 198-91 P n2o CCGG 313.130 0.550 ... H4 1999 02 05 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129032 SPO 1998 12 07 23 21 00 439-91 S n2o CCGG 313.870 0.550 ... H4 1999 02 02 15 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129033 SPO 1998 12 07 23 21 00 440-91 S n2o CCGG 314.010 0.550 ... H4 1999 02 02 15 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129034 SPO 1998 12 15 02 12 00 4245-91 P n2o CCGG 313.320 0.550 ... H4 1999 02 03 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129035 SPO 1998 12 15 02 12 00 4246-91 P n2o CCGG 313.180 0.550 ... H4 1999 02 03 14 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129036 SPO 1998 12 15 02 20 00 243-91 S n2o CCGG 313.480 0.550 ... H4 1999 02 02 15 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129037 SPO 1998 12 15 02 20 00 244-91 S n2o CCGG 313.380 0.550 ... H4 1999 02 02 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129038 SPO 1998 12 21 21 16 00 4751-91 S n2o CCGG 313.470 0.550 ... H4 1999 02 02 16 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129039 SPO 1998 12 21 21 16 00 4752-91 S n2o CCGG 313.400 0.550 ... H4 1999 02 02 16 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129040 SPO 1998 12 21 21 18 00 4247-91 P n2o CCGG 310.220 0.550 A.. H4 1999 02 05 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129041 SPO 1998 12 21 21 18 00 4248-91 P n2o CCGG 313.110 0.550 ... H4 1999 02 05 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129042 SPO 1999 01 02 03 19 00 4733-91 P n2o CCGG 314.910 0.550 A.. H4 1999 02 17 09 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129043 SPO 1999 01 02 03 19 00 4734-91 P n2o CCGG 315.430 0.550 A.. H4 1999 02 17 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129044 SPO 1999 01 02 03 24 00 4741-91 S n2o CCGG 313.340 0.550 ... H4 1999 02 17 09 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129045 SPO 1999 01 02 03 24 00 4742-91 S n2o CCGG 315.080 0.550 A.. H4 1999 02 17 09 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129046 SPO 1999 01 10 22 09 00 1657-91 P n2o CCGG 313.710 0.550 ... H4 1999 02 11 13 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129047 SPO 1999 01 10 22 09 00 1658-91 P n2o CCGG 313.210 0.550 ... H4 1999 02 11 14 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129048 SPO 1999 01 10 22 20 00 515-91 S n2o CCGG 313.070 0.550 ... H4 1999 02 11 14 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129049 SPO 1999 01 10 22 20 00 516-91 S n2o CCGG 313.840 0.550 ... H4 1999 02 11 14 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129050 SPO 1999 01 16 05 14 00 309-91 P n2o CCGG 313.680 0.550 ... H4 1999 02 17 10 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129051 SPO 1999 01 16 05 14 00 310-91 P n2o CCGG 313.250 0.550 ... H4 1999 02 17 10 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129052 SPO 1999 01 16 05 22 00 4743-91 S n2o CCGG 313.520 0.550 ... H4 1999 02 17 10 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129053 SPO 1999 01 16 05 22 00 4744-91 S n2o CCGG 313.420 0.550 ... H4 1999 02 17 10 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129054 SPO 1999 01 23 02 09 00 4621-91 P n2o CCGG 313.630 0.550 ... H4 1999 02 11 15 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129055 SPO 1999 01 23 02 09 00 4622-91 P n2o CCGG 313.280 0.550 ... H4 1999 02 11 15 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129056 SPO 1999 01 23 02 15 00 4629-91 S n2o CCGG 313.720 0.550 ... H4 1999 02 11 15 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129057 SPO 1999 01 23 02 15 00 4630-91 S n2o CCGG 313.530 0.550 ... H4 1999 02 11 15 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129058 SPO 1999 02 01 02 11 00 247-91 P n2o CCGG 313.770 0.550 A.. H4 1999 12 03 09 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129059 SPO 1999 02 01 02 11 00 248-91 P n2o CCGG 314.110 0.550 A.. H4 1999 12 03 10 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129060 SPO 1999 02 01 02 17 00 4715-91 S n2o CCGG 313.690 0.550 A.. H4 1999 12 09 12 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129061 SPO 1999 02 01 02 17 00 4716-91 S n2o CCGG 313.460 0.550 A.. H4 1999 12 09 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129062 SPO 1999 02 16 05 13 00 1003-91 P n2o CCGG 314.590 0.550 A.. H4 1999 12 09 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129063 SPO 1999 02 16 05 13 00 1004-91 P n2o CCGG 314.430 0.550 A.. H4 1999 12 09 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129064 SPO 1999 02 16 05 17 00 4519-91 S n2o CCGG 313.990 0.550 A.. H4 1999 12 03 10 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129065 SPO 1999 02 16 05 17 00 4520-91 S n2o CCGG 314.230 0.550 A.. H4 1999 12 03 10 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129066 SPO 1999 02 23 21 08 00 4383-91 P n2o CCGG 314.650 0.550 A.. H4 1999 12 03 09 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129067 SPO 1999 02 23 21 08 00 4384-91 P n2o CCGG 314.460 0.550 A.. H4 1999 12 03 09 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129068 SPO 1999 02 23 21 20 00 4699-91 S n2o CCGG 314.160 0.550 A.. H4 1999 12 09 11 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129069 SPO 1999 02 23 21 20 00 4700-91 S n2o CCGG 313.980 0.550 A.. H4 1999 12 09 11 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129070 SPO 1999 03 01 21 16 00 4395-91 P n2o CCGG 313.490 0.550 A.. H4 1999 12 09 12 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129071 SPO 1999 03 01 21 16 00 4396-91 P n2o CCGG 313.720 0.550 A.. H4 1999 12 09 12 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129072 SPO 1999 03 01 21 20 00 1071-91 S n2o CCGG 314.090 0.550 A.. H4 1999 12 03 10 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129073 SPO 1999 03 01 21 20 00 1072-91 S n2o CCGG 313.900 0.550 A.. H4 1999 12 03 11 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129074 SPO 1999 03 08 21 09 00 27-91 P n2o CCGG 314.280 0.550 A.. H4 1999 12 08 09 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129075 SPO 1999 03 08 21 09 00 28-91 P n2o CCGG 314.080 0.550 A.. H4 1999 12 08 09 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129076 SPO 1999 03 16 00 13 00 1901-91 P n2o CCGG 314.370 0.550 A.. H4 1999 12 08 10 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129078 SPO 1999 03 16 00 13 00 606-91 P n2o CCGG 313.810 0.550 A.. H4 1999 12 08 10 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129077 SPO 1999 03 16 00 19 00 1225-91 S n2o CCGG 314.710 0.550 A.. H4 1999 12 08 09 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129079 SPO 1999 03 16 00 19 00 1226-91 S n2o CCGG 314.370 0.550 A.. H4 1999 12 08 09 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129080 SPO 1999 04 01 22 18 00 1847-91 S n2o CCGG 314.490 0.550 A.. H4 1999 12 03 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129081 SPO 1999 04 01 22 18 00 1848-91 S n2o CCGG 314.030 0.550 A.. H4 1999 12 03 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129082 SPO 1999 04 02 20 30 00 1701-91 P n2o CCGG 314.660 0.550 A.. H4 1999 12 03 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129083 SPO 1999 04 02 20 30 00 1702-91 P n2o CCGG 314.240 0.550 A.. H4 1999 12 03 11 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129084 SPO 1999 04 08 22 27 00 4329-91 P n2o CCGG 313.860 0.550 A.. H4 1999 12 03 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129085 SPO 1999 04 08 22 27 00 4330-91 P n2o CCGG 314.360 0.550 A.. H4 1999 12 03 13 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129086 SPO 1999 04 15 21 09 00 353-91 P n2o CCGG 314.040 0.550 A.. H4 1999 12 13 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129087 SPO 1999 04 15 21 09 00 354-91 P n2o CCGG 314.170 0.550 A.. H4 1999 12 13 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129088 SPO 1999 04 15 21 15 00 1467-91 S n2o CCGG 313.630 0.550 A.. H4 1999 12 03 11 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129089 SPO 1999 04 15 21 15 00 1468-91 S n2o CCGG 312.490 0.550 A.. H4 1999 12 03 12 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129090 SPO 1999 04 24 21 16 00 983-91 P n2o CCGG 315.310 0.550 A.. H4 1999 12 13 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129091 SPO 1999 04 24 21 16 00 984-91 P n2o CCGG 314.090 0.550 A.. H4 1999 12 13 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129092 SPO 1999 05 01 11 14 00 1389-91 P n2o CCGG 313.300 0.550 A.. H4 1999 12 13 13 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129093 SPO 1999 05 01 11 14 00 1390-91 P n2o CCGG 314.620 0.550 A.. H4 1999 12 13 13 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129094 SPO 1999 05 01 11 19 00 67-91 S n2o CCGG 314.530 0.550 A.. H4 1999 12 13 12 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129095 SPO 1999 05 01 11 19 00 68-91 S n2o CCGG 314.710 0.550 A.. H4 1999 12 13 12 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129096 SPO 1999 05 09 20 53 00 4573-91 P n2o CCGG 314.660 0.550 A.. H4 1999 12 03 16 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129097 SPO 1999 05 09 20 53 00 4574-91 P n2o CCGG 314.140 0.550 A.. H4 1999 12 03 16 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129098 SPO 1999 05 15 23 13 00 4393-91 P n2o CCGG 314.370 0.550 A.. H4 1999 12 03 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129099 SPO 1999 05 15 23 13 00 4394-91 P n2o CCGG 314.520 0.550 A.. H4 1999 12 03 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129100 SPO 1999 05 15 23 19 00 1627-91 S n2o CCGG 313.580 0.550 A.. H4 1999 12 03 15 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129101 SPO 1999 05 15 23 19 00 1628-91 S n2o CCGG 314.580 0.550 A.. H4 1999 12 03 15 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129102 SPO 1999 05 24 04 08 00 1845-91 P n2o CCGG 313.940 0.550 A.. H4 1999 12 07 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129103 SPO 1999 05 24 04 08 00 1846-91 P n2o CCGG 314.280 0.550 A.. H4 1999 12 07 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129104 SPO 1999 06 02 23 18 00 641-91 P n2o CCGG 313.640 0.550 A.. H4 1999 12 07 11 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129105 SPO 1999 06 02 23 18 00 642-91 P n2o CCGG 314.240 0.550 A.. H4 1999 12 07 11 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129106 SPO 1999 06 02 23 24 00 227-91 S n2o CCGG 314.350 0.550 A.. H4 1999 12 06 13 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129107 SPO 1999 06 02 23 24 00 228-91 S n2o CCGG 314.080 0.550 A.. H4 1999 12 06 14 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129108 SPO 1999 06 08 23 47 00 4451-91 P n2o CCGG 314.150 0.550 A.. H4 1999 12 06 13 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129109 SPO 1999 06 08 23 47 00 4452-91 P n2o CCGG 313.800 0.550 A.. H4 1999 12 06 13 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129110 SPO 1999 06 15 20 18 00 1513-91 P n2o CCGG 313.590 0.550 A.. H4 1999 12 07 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129111 SPO 1999 06 15 20 18 00 1514-91 P n2o CCGG 313.740 0.550 A.. H4 1999 12 07 11 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129112 SPO 1999 06 15 20 24 00 497-91 S n2o CCGG 314.780 0.550 A.. H4 1999 12 06 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129113 SPO 1999 06 15 20 24 00 498-91 S n2o CCGG 314.140 0.550 A.. H4 1999 12 06 13 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129114 SPO 1999 06 24 07 34 00 1856-91 P n2o CCGG 314.480 0.550 A.. H4 1999 12 06 16 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129115 SPO 1999 07 01 12 16 00 4255-91 P n2o CCGG 313.860 0.550 A.. H4 1999 12 06 15 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129116 SPO 1999 07 01 12 16 00 4256-91 P n2o CCGG 313.740 0.550 A.. H4 1999 12 06 16 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129117 SPO 1999 07 01 12 22 00 463-91 S n2o CCGG 314.590 0.550 A.. H4 1999 12 07 09 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129118 SPO 1999 07 01 12 22 00 464-91 S n2o CCGG 314.400 0.550 A.. H4 1999 12 07 09 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129119 SPO 1999 07 09 23 28 00 1211-91 P n2o CCGG 313.660 0.550 A.. H4 1999 12 06 15 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129120 SPO 1999 07 09 23 28 00 1212-91 P n2o CCGG 313.270 0.550 A.. H4 1999 12 06 15 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129121 SPO 1999 07 15 22 18 00 607-91 P n2o CCGG 314.250 0.550 A.. H4 1999 12 06 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129122 SPO 1999 07 15 22 18 00 608-91 P n2o CCGG 314.060 0.550 A.. H4 1999 12 06 15 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129123 SPO 1999 07 15 22 23 00 1351-91 S n2o CCGG 314.620 0.550 A.. H4 1999 12 06 14 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129124 SPO 1999 07 15 22 23 00 1352-91 S n2o CCGG 314.120 0.550 A.. H4 1999 12 06 14 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129125 SPO 1999 07 24 20 50 00 1463-91 P n2o CCGG 313.920 0.550 A.. H4 1999 12 09 13 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129126 SPO 1999 07 24 20 50 00 1464-91 P n2o CCGG 314.090 0.550 A.. H4 1999 12 09 13 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129127 SPO 1999 08 02 15 13 00 4157-91 P n2o CCGG 314.190 0.550 A.. H4 1999 12 09 14 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129128 SPO 1999 08 02 15 13 00 4158-91 P n2o CCGG 314.180 0.550 A.. H4 1999 12 09 14 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129129 SPO 1999 08 02 15 19 00 131-91 S n2o CCGG 314.170 0.550 A.. H4 1999 12 09 13 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129130 SPO 1999 08 02 15 19 00 132-91 S n2o CCGG 314.350 0.550 A.. H4 1999 12 09 13 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129131 SPO 1999 08 10 00 04 00 4277-91 P n2o CCGG 313.770 0.550 A.. H4 1999 12 09 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129132 SPO 1999 08 10 00 04 00 4278-91 P n2o CCGG 313.730 0.550 A.. H4 1999 12 09 14 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129133 SPO 1999 08 17 16 13 00 751-91 P n2o CCGG 314.090 0.550 A.. H4 1999 12 02 15 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129134 SPO 1999 08 17 16 13 00 752-91 P n2o CCGG 314.670 0.550 A.. H4 1999 12 02 16 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129135 SPO 1999 08 17 16 19 00 277-91 S n2o CCGG 314.470 0.550 A.. H4 1999 12 07 09 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129136 SPO 1999 08 17 16 19 00 278-91 S n2o CCGG 314.230 0.550 A.. H4 1999 12 07 10 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129137 SPO 1999 08 25 22 01 00 1743-91 P n2o CCGG 314.820 0.550 A.. H4 1999 12 07 10 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129138 SPO 1999 08 25 22 01 00 1744-91 P n2o CCGG 314.680 0.550 A.. H4 1999 12 07 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129139 SPO 1999 09 02 22 13 00 4215-91 P n2o CCGG 314.440 0.550 A.. H4 1999 12 02 16 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129140 SPO 1999 09 02 22 13 00 4216-91 P n2o CCGG 314.010 0.550 A.. H4 1999 12 02 16 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129141 SPO 1999 09 02 22 19 00 1341-91 S n2o CCGG 314.670 0.550 A.. H4 1999 12 06 10 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129142 SPO 1999 09 02 22 19 00 1342-91 S n2o CCGG 314.630 0.550 A.. H4 1999 12 06 10 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129143 SPO 1999 09 09 19 40 00 19-91 P n2o CCGG 314.270 0.550 A.. H4 1999 12 06 09 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129144 SPO 1999 09 09 19 40 00 20-91 P n2o CCGG 313.980 0.550 A.. H4 1999 12 06 09 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129145 SPO 1999 09 16 22 15 00 4449-91 P n2o CCGG 314.070 0.550 A.. H4 1999 12 03 16 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129146 SPO 1999 09 16 22 15 00 4450-91 P n2o CCGG 313.980 0.550 A.. H4 1999 12 03 16 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129147 SPO 1999 09 16 22 21 00 1717-91 S n2o CCGG 314.580 0.550 A.. H4 1999 12 06 10 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129148 SPO 1999 09 16 22 21 00 1718-91 S n2o CCGG 314.780 0.550 A.. H4 1999 12 06 10 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129149 SPO 1999 09 24 23 42 00 701-91 P n2o CCGG 315.790 0.550 A.. H4 2000 02 16 09 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129150 SPO 1999 09 24 23 42 00 702-91 P n2o CCGG 316.230 0.550 A.. H4 2000 02 16 10 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129151 SPO 1999 10 02 20 15 00 4317-91 P n2o CCGG 315.980 0.550 A.. H4 2000 02 16 09 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129152 SPO 1999 10 02 20 15 00 4318-91 P n2o CCGG 315.430 0.550 A.. H4 2000 02 16 09 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129153 SPO 1999 10 02 20 19 00 1493-91 S n2o CCGG 316.440 0.550 A.. H4 2000 02 15 15 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129154 SPO 1999 10 02 20 19 00 1494-91 S n2o CCGG 315.640 0.550 A.. H4 2000 02 15 16 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129155 SPO 1999 10 09 01 51 00 4691-91 P n2o CCGG 316.710 0.550 A.. H4 2000 02 15 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129156 SPO 1999 10 09 01 51 00 4692-91 P n2o CCGG 316.500 0.550 A.. H4 2000 02 15 14 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129157 SPO 1999 10 17 01 12 00 1965-91 P n2o CCGG 316.570 0.550 A.. H4 2000 02 15 15 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129158 SPO 1999 10 17 01 12 00 1966-91 P n2o CCGG 315.670 0.550 A.. H4 2000 02 15 15 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129159 SPO 1999 10 17 01 20 00 1943-91 S n2o CCGG 297.780 -999.990 A.. H4 2000 02 15 14 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129160 SPO 1999 10 24 22 31 00 1605-91 P n2o CCGG 316.270 0.550 A.. H4 2000 02 15 15 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129161 SPO 1999 10 24 22 31 00 1606-91 P n2o CCGG 316.270 0.550 A.. H4 2000 02 15 15 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129162 SPO 1999 11 06 02 50 00 19-98 P n2o CCGG 316.160 0.550 A.. H4 2000 02 14 12 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129163 SPO 1999 11 06 02 50 00 20-98 P n2o CCGG 315.760 0.550 A.. H4 2000 02 14 12 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129164 SPO 1999 11 06 03 16 00 755-91 S n2o CCGG 316.280 0.550 A.. H4 2000 02 15 09 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129165 SPO 1999 11 06 03 16 00 756-91 S n2o CCGG 316.460 0.550 A.. H4 2000 02 15 09 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129166 SPO 1999 11 11 11 05 00 4193-91 P n2o CCGG 316.960 0.550 A.. H4 2000 02 15 10 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129167 SPO 1999 11 11 11 05 00 4194-91 P n2o CCGG 316.490 0.550 A.. H4 2000 02 15 10 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129168 SPO 1999 11 19 03 10 00 251-91 S n2o CCGG 316.870 0.550 A.. H4 2000 02 14 14 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129169 SPO 1999 11 19 03 10 00 252-91 S n2o CCGG 316.540 0.550 A.. H4 2000 02 14 14 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129170 SPO 1999 11 19 03 35 00 4263-91 P n2o CCGG 317.000 0.550 A.. H4 2000 02 14 11 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129171 SPO 1999 11 19 03 35 00 4264-91 P n2o CCGG 316.510 0.550 A.. H4 2000 02 14 11 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129172 SPO 1999 12 07 08 10 00 4007-91 S n2o CCGG 316.410 0.550 A.. H4 2000 02 15 09 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129173 SPO 1999 12 07 08 10 00 4008-91 S n2o CCGG 316.720 0.550 A.. H4 2000 02 15 10 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129174 SPO 1999 12 07 09 55 00 219-91 P n2o CCGG 316.310 0.550 A.. H4 2000 02 14 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129175 SPO 1999 12 07 09 55 00 220-91 P n2o CCGG 316.510 0.550 A.. H4 2000 02 14 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129176 SPO 1999 12 17 23 14 00 1169-91 P n2o CCGG 317.030 0.550 A.. H4 2000 02 14 13 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129177 SPO 1999 12 17 23 14 00 1170-91 P n2o CCGG 316.630 0.550 A.. H4 2000 02 14 13 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129178 SPO 1999 12 21 14 15 00 4301-91 S n2o CCGG 316.590 0.550 A.. H4 2000 02 14 14 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129179 SPO 1999 12 21 14 15 00 4302-91 S n2o CCGG 316.230 0.550 A.. H4 2000 02 14 14 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129180 SPO 1999 12 21 16 47 00 987-91 P n2o CCGG 316.230 0.550 A.. H4 2000 02 17 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129181 SPO 1999 12 21 16 47 00 988-91 P n2o CCGG 316.520 0.550 A.. H4 2000 02 17 10 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129182 SPO 1999 12 31 02 35 00 257-91 P n2o CCGG 316.480 0.550 A.. H4 2000 02 17 11 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129183 SPO 1999 12 31 02 35 00 258-91 P n2o CCGG 315.940 0.550 A.. H4 2000 02 17 11 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129184 SPO 2000 01 10 14 11 00 4469-91 S n2o CCGG 316.390 0.550 A.. H4 2000 02 17 12 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129185 SPO 2000 01 10 14 11 00 4470-91 S n2o CCGG 316.410 0.550 A.. H4 2000 02 17 13 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129186 SPO 2000 01 10 14 42 00 255-91 P n2o CCGG 317.280 0.550 A.. H4 2000 02 17 11 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129187 SPO 2000 01 10 14 42 00 256-91 P n2o CCGG 316.900 0.550 A.. H4 2000 02 17 11 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129188 SPO 2000 01 17 22 15 00 1231-91 S n2o CCGG 316.290 0.550 A.. H4 2000 02 16 16 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129189 SPO 2000 01 17 22 15 00 1232-91 S n2o CCGG 316.620 0.550 A.. H4 2000 02 16 16 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129190 SPO 2000 01 17 23 25 00 4887-91 P n2o CCGG 316.570 0.550 A.. H4 2000 02 17 10 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129191 SPO 2000 01 17 23 25 00 4888-91 P n2o CCGG 316.280 0.550 A.. H4 2000 02 17 10 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129192 SPO 2000 01 23 16 40 00 4885-91 P n2o CCGG 316.830 0.550 A.. H4 2000 02 16 15 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129193 SPO 2000 01 23 16 40 00 4886-91 P n2o CCGG 316.760 0.550 A.. H4 2000 02 16 15 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129194 SPO 2000 01 23 17 10 00 161-91 S n2o CCGG 316.780 0.550 A.. H4 2000 02 16 15 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129195 SPO 2000 01 23 17 10 00 162-91 S n2o CCGG 316.850 0.550 A.. H4 2000 02 16 15 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129196 SPO 2000 01 31 09 55 00 4907-91 P n2o CCGG 314.210 0.380 ... H4 2000 12 04 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129197 SPO 2000 01 31 09 55 00 4908-91 P n2o CCGG 314.260 0.380 ... H4 2000 12 04 10 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129198 SPO 2000 01 31 10 15 00 4897-91 S n2o CCGG 314.180 0.380 ... H4 2000 12 04 10 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129199 SPO 2000 01 31 10 15 00 4898-91 S n2o CCGG 314.100 0.380 ... H4 2000 12 04 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129200 SPO 2000 02 05 02 15 00 4921-91 S n2o CCGG 314.810 0.380 ... H4 2000 12 04 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129201 SPO 2000 02 05 02 15 00 4922-91 S n2o CCGG 314.550 0.380 ... H4 2000 12 04 12 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129202 SPO 2000 02 05 03 35 00 4919-91 P n2o CCGG 314.270 0.380 ... H4 2000 12 04 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129203 SPO 2000 02 05 03 35 00 4920-91 P n2o CCGG 314.660 0.380 ... H4 2000 12 04 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129204 SPO 2000 02 18 12 55 00 4507-91 P n2o CCGG 314.030 0.380 ... H4 2000 12 04 09 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129205 SPO 2000 02 18 12 55 00 4508-91 P n2o CCGG 313.890 0.380 ... H4 2000 12 04 09 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129206 SPO 2000 02 18 13 15 00 1677-91 S n2o CCGG 313.760 0.380 ... H4 2000 12 04 10 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129207 SPO 2000 02 18 13 15 00 1678-91 S n2o CCGG 314.120 0.380 ... H4 2000 12 04 10 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129208 SPO 2000 02 22 15 15 00 4673-91 S n2o CCGG 313.860 0.380 ... H4 2000 12 04 11 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129209 SPO 2000 02 22 15 15 00 4674-91 S n2o CCGG 316.900 0.380 N.. H4 2000 12 04 11 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129210 SPO 2000 02 22 15 45 00 4411-91 P n2o CCGG 313.920 0.380 ... H4 2000 12 04 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129211 SPO 2000 02 22 15 45 00 4412-91 P n2o CCGG 314.430 0.380 ... H4 2000 12 04 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129212 SPO 2000 03 04 05 15 00 1977-91 S n2o CCGG 313.950 0.380 ... H4 2000 12 13 14 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129213 SPO 2000 03 04 05 15 00 1978-91 S n2o CCGG 314.380 0.380 ... H4 2000 12 13 14 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129214 SPO 2000 03 04 05 55 00 1575-91 P n2o CCGG 314.630 0.380 ... H4 2000 12 13 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129215 SPO 2000 03 04 05 55 00 1576-91 P n2o CCGG 314.350 0.380 ... H4 2000 12 13 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129216 SPO 2000 03 10 19 00 00 4763-91 P n2o CCGG 315.520 0.380 N.. H4 2000 12 13 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129217 SPO 2000 03 10 19 00 00 4764-91 P n2o CCGG 314.110 0.380 ... H4 2000 12 13 12 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129218 SPO 2000 03 10 19 15 00 1049-91 S n2o CCGG 313.970 0.380 ... H4 2000 12 13 13 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129219 SPO 2000 03 10 19 15 00 1050-91 S n2o CCGG 313.860 0.380 ... H4 2000 12 13 13 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129220 SPO 2000 03 19 18 10 00 4083-91 S n2o CCGG 314.000 0.380 ... H4 2000 12 13 12 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129221 SPO 2000 03 19 18 10 00 4084-91 S n2o CCGG 314.000 0.380 ... H4 2000 12 13 12 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129222 SPO 2000 03 19 18 15 00 4529-91 P n2o CCGG 314.510 0.380 ... H4 2000 12 13 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129223 SPO 2000 03 19 18 15 00 4530-91 P n2o CCGG 314.040 0.380 ... H4 2000 12 13 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129224 SPO 2000 03 25 01 10 00 2025-91 S n2o CCGG 314.380 0.380 ... H4 2000 12 13 13 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129225 SPO 2000 03 25 01 10 00 2026-91 S n2o CCGG 314.070 0.380 ... H4 2000 12 13 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129226 SPO 2000 03 25 01 45 00 4527-91 P n2o CCGG 313.780 0.380 ... H4 2000 12 13 11 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129227 SPO 2000 03 25 01 45 00 4528-91 P n2o CCGG 314.080 0.380 ... H4 2000 12 13 11 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129228 SPO 2000 03 31 23 15 00 303-91 S n2o CCGG 314.400 0.380 ... H4 2000 12 01 14 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129229 SPO 2000 03 31 23 15 00 304-91 S n2o CCGG 314.070 0.380 ... H4 2000 12 01 14 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129230 SPO 2000 03 31 23 50 00 845-91 P n2o CCGG 314.400 0.380 ... H4 2000 12 04 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129231 SPO 2000 03 31 23 50 00 846-91 P n2o CCGG 314.230 0.380 ... H4 2000 12 04 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129232 SPO 2000 04 02 23 15 00 4653-91 S n2o CCGG 314.320 0.380 ... H4 2000 12 01 14 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129233 SPO 2000 04 02 23 15 00 4654-91 S n2o CCGG 314.310 0.380 ... H4 2000 12 01 14 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129234 SPO 2000 04 02 23 55 00 4133-91 P n2o CCGG 313.810 0.380 ... H4 2000 12 04 14 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129235 SPO 2000 04 02 23 55 00 4134-91 P n2o CCGG 314.060 0.380 ... H4 2000 12 04 14 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129236 SPO 2000 04 09 23 15 00 493-91 S n2o CCGG 315.210 0.380 .X. H4 2000 12 04 08 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129237 SPO 2000 04 09 23 15 00 494-91 S n2o CCGG 314.800 0.380 .X. H4 2000 12 04 08 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129238 SPO 2000 04 09 23 50 00 205-91 P n2o CCGG 314.180 0.380 ... H4 2000 12 04 13 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129239 SPO 2000 04 09 23 50 00 206-91 P n2o CCGG 314.050 0.380 ... H4 2000 12 04 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129240 SPO 2000 04 15 01 15 00 97-98 S n2o CCGG 314.260 0.380 ... H4 2000 12 04 08 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129241 SPO 2000 04 15 01 15 00 98-98 S n2o CCGG 314.010 0.380 ... H4 2000 12 04 09 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129242 SPO 2000 04 15 02 40 00 1649-91 P n2o CCGG 314.290 0.380 ... H4 2000 12 04 13 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129243 SPO 2000 04 15 02 40 00 1650-91 P n2o CCGG 313.830 0.380 ... H4 2000 12 04 13 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129244 SPO 2000 04 23 18 15 00 4903-91 S n2o CCGG 313.870 0.380 ... H4 2000 12 12 14 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129245 SPO 2000 04 23 18 15 00 4904-91 S n2o CCGG 314.170 0.380 ... H4 2000 12 12 14 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129246 SPO 2000 04 23 19 20 00 4889-91 P n2o CCGG 313.670 0.380 ... H4 2000 12 12 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129247 SPO 2000 04 23 19 20 00 4890-91 P n2o CCGG 313.770 0.380 ... H4 2000 12 12 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129248 SPO 2000 05 04 04 15 00 4165-91 S n2o CCGG 314.090 0.380 ... H4 2000 12 14 10 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129249 SPO 2000 05 04 04 55 00 4891-91 P n2o CCGG 313.720 0.380 ... H4 2000 12 14 09 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129250 SPO 2000 05 04 04 55 00 4892-91 P n2o CCGG 313.470 0.380 ... H4 2000 12 14 09 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129251 SPO 2000 05 11 22 10 00 4047-91 S n2o CCGG 314.290 0.380 ... H4 2000 12 14 10 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129252 SPO 2000 05 11 22 10 00 4048-91 S n2o CCGG 314.280 0.380 ... H4 2000 12 14 10 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129253 SPO 2000 05 11 23 00 00 4265-91 P n2o CCGG 313.610 0.380 ... H4 2000 12 14 09 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129254 SPO 2000 05 11 23 00 00 4266-91 P n2o CCGG 313.940 0.380 ... H4 2000 12 14 10 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129255 SPO 2000 05 15 19 15 00 1005-91 S n2o CCGG 314.170 0.380 ... H4 2000 12 12 13 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129256 SPO 2000 05 15 19 15 00 1006-91 S n2o CCGG 313.850 0.380 ... H4 2000 12 12 13 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129257 SPO 2000 05 15 19 55 00 4305-91 P n2o CCGG 313.910 0.380 ... H4 2000 12 08 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129258 SPO 2000 05 15 19 55 00 4306-91 P n2o CCGG 313.490 0.380 ... H4 2000 12 08 15 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129259 SPO 2000 05 29 16 10 00 4899-91 S n2o CCGG 314.580 0.380 ... H4 2000 12 08 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129260 SPO 2000 05 29 16 10 00 4900-91 S n2o CCGG 314.260 0.380 ... H4 2000 12 08 12 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129261 SPO 2000 05 29 16 45 00 4489-91 P n2o CCGG 313.590 0.380 ... H4 2000 12 08 14 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129262 SPO 2000 05 29 16 45 00 4490-91 P n2o CCGG 314.110 0.380 ... H4 2000 12 08 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129263 SPO 2000 06 01 16 15 00 4079-91 S n2o CCGG 313.750 0.380 ... H4 2000 12 08 12 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129264 SPO 2000 06 01 16 15 00 4080-91 S n2o CCGG 313.640 0.380 ... H4 2000 12 08 12 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129265 SPO 2000 06 01 16 55 00 439-91 P n2o CCGG 314.110 0.380 ... H4 2000 12 08 13 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129266 SPO 2000 06 01 16 55 00 440-91 P n2o CCGG 313.630 0.380 ... H4 2000 12 08 14 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129267 SPO 2000 06 10 04 15 00 389-91 S n2o CCGG 314.500 0.380 ... H4 2000 12 08 13 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129268 SPO 2000 06 10 04 15 00 390-91 S n2o CCGG 313.860 0.380 ... H4 2000 12 08 13 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129269 SPO 2000 06 10 04 55 00 827-91 P n2o CCGG 314.140 0.380 ... H4 2000 12 08 13 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129270 SPO 2000 06 10 04 55 00 828-91 P n2o CCGG 314.240 0.380 ... H4 2000 12 08 13 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129271 SPO 2000 06 16 15 10 00 4687-91 S n2o CCGG 317.900 0.380 N.. H4 2000 12 13 08 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129272 SPO 2000 06 16 15 10 00 4688-91 S n2o CCGG 314.380 0.380 ... H4 2000 12 13 09 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129273 SPO 2000 06 16 15 55 00 1051-91 P n2o CCGG 314.560 0.380 ... H4 2000 12 14 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129274 SPO 2000 06 26 23 10 00 2023-91 S n2o CCGG 314.480 0.380 ... H4 2000 12 12 14 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129275 SPO 2000 06 26 23 10 00 2024-91 S n2o CCGG 314.700 0.380 ... H4 2000 12 12 15 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129276 SPO 2000 06 26 23 55 00 1063-91 P n2o CCGG 315.750 0.380 .X. H4 2000 12 13 08 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129277 SPO 2000 06 26 23 55 00 1064-91 P n2o CCGG 314.960 0.380 .X. H4 2000 12 13 08 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129278 SPO 2000 07 04 12 15 00 635-91 S n2o CCGG 314.280 0.380 ... H4 2000 12 13 08 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129279 SPO 2000 07 04 12 15 00 636-91 S n2o CCGG 313.910 0.380 ... H4 2000 12 13 08 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129280 SPO 2000 07 04 12 50 00 4399-91 P n2o CCGG 314.170 0.380 ... H4 2000 12 12 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129281 SPO 2000 07 04 12 50 00 4400-91 P n2o CCGG 314.850 0.380 ... H4 2000 12 12 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129282 SPO 2000 07 13 15 15 00 101-91 S n2o CCGG 314.370 0.380 ... H4 2000 12 11 13 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129283 SPO 2000 07 13 15 15 00 102-91 S n2o CCGG 314.560 0.380 ... H4 2000 12 11 13 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129284 SPO 2000 07 13 15 50 00 1593-91 P n2o CCGG 314.250 0.380 ... H4 2000 12 11 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129285 SPO 2000 07 13 15 50 00 1594-91 P n2o CCGG 314.470 0.380 ... H4 2000 12 11 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129286 SPO 2000 07 15 19 15 00 4895-91 S n2o CCGG 314.510 0.380 ... H4 2000 12 11 12 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129287 SPO 2000 07 15 19 15 00 4896-91 S n2o CCGG 314.300 0.380 ... H4 2000 12 11 13 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129288 SPO 2000 07 15 19 50 00 1639-91 P n2o CCGG 314.530 0.380 ... H4 2000 12 11 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129289 SPO 2000 07 15 19 50 00 1640-91 P n2o CCGG 314.560 0.380 ... H4 2000 12 11 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129290 SPO 2000 07 21 22 15 00 4663-91 S n2o CCGG 315.260 0.380 ... H4 2000 12 14 08 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129291 SPO 2000 07 21 22 15 00 4664-91 S n2o CCGG 315.240 0.380 ... H4 2000 12 14 08 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129292 SPO 2000 07 21 23 00 00 4053-91 P n2o CCGG 315.170 0.380 ... H4 2000 12 13 14 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129293 SPO 2000 07 21 23 00 00 4054-91 P n2o CCGG 314.470 0.380 ... H4 2000 12 13 15 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129294 SPO 2000 07 28 11 15 00 427-91 S n2o CCGG 314.320 0.380 ... H4 2000 12 14 08 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129295 SPO 2000 07 28 11 15 00 428-91 S n2o CCGG 314.670 0.380 ... H4 2000 12 14 08 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129296 SPO 2000 07 28 11 55 00 1647-91 P n2o CCGG 314.710 0.380 ... H4 2000 12 13 15 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129297 SPO 2000 07 28 11 55 00 1648-91 P n2o CCGG 314.530 0.380 ... H4 2000 12 13 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129298 SPO 2000 08 02 19 15 00 53-91 S n2o CCGG 314.790 0.380 ... H4 2000 12 12 11 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129299 SPO 2000 08 02 19 15 00 54-91 S n2o CCGG 315.010 0.380 ... H4 2000 12 12 11 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129300 SPO 2000 08 02 19 50 00 4361-91 P n2o CCGG 315.000 0.380 ... H4 2000 12 12 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129301 SPO 2000 08 02 19 50 00 4362-91 P n2o CCGG 315.040 0.380 ... H4 2000 12 12 11 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129302 SPO 2000 08 09 18 15 00 4743-91 S n2o CCGG 315.170 0.380 ... H4 2000 12 13 09 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129303 SPO 2000 08 09 18 15 00 4744-91 S n2o CCGG 314.960 0.380 ... H4 2000 12 13 10 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129304 SPO 2000 08 09 18 50 00 1047-91 P n2o CCGG 314.610 0.380 ... H4 2000 12 12 10 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129305 SPO 2000 08 09 18 50 00 1048-91 P n2o CCGG 314.260 0.380 ... H4 2000 12 12 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129306 SPO 2000 08 15 20 15 00 479-91 S n2o CCGG 314.590 0.380 ... H4 2000 12 13 10 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129307 SPO 2000 08 15 20 15 00 480-91 S n2o CCGG 314.650 0.380 ... H4 2000 12 13 10 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129308 SPO 2000 08 15 20 50 00 4901-91 P n2o CCGG 314.370 0.380 ... H4 2000 12 12 10 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129309 SPO 2000 08 15 20 50 00 4902-91 P n2o CCGG 313.970 0.380 ... H4 2000 12 12 10 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129310 SPO 2000 08 30 22 15 00 171-91 S n2o CCGG 314.710 0.380 ... H4 2000 12 13 10 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129311 SPO 2000 08 30 22 15 00 172-91 S n2o CCGG 314.800 0.380 ... H4 2000 12 13 11 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129312 SPO 2000 08 30 22 55 00 4905-91 P n2o CCGG 314.970 0.380 ... H4 2000 12 13 09 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129313 SPO 2000 08 30 22 55 00 4906-91 P n2o CCGG 314.600 0.380 ... H4 2000 12 13 09 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129314 SPO 2000 09 02 21 15 00 1567-91 S n2o CCGG 315.450 0.380 ... H4 2000 12 12 09 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129315 SPO 2000 09 02 21 15 00 1568-91 S n2o CCGG 315.380 0.380 ... H4 2000 12 12 09 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129316 SPO 2000 09 02 21 50 00 4761-91 P n2o CCGG 314.550 0.380 ... H4 2000 12 12 11 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129317 SPO 2000 09 02 21 50 00 4762-91 P n2o CCGG 314.770 0.380 ... H4 2000 12 12 12 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129318 SPO 2000 09 09 05 55 00 17-98 P n2o CCGG 314.900 0.380 ... H4 2000 12 12 08 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129319 SPO 2000 09 09 05 55 00 18-98 P n2o CCGG 314.780 0.380 ... H4 2000 12 12 09 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129320 SPO 2000 09 09 06 15 00 4619-91 S n2o CCGG 314.650 0.380 ... H4 2000 12 12 12 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129321 SPO 2000 09 09 06 15 00 4620-91 S n2o CCGG 315.530 0.380 ... H4 2000 12 12 12 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129322 SPO 2000 09 15 08 15 00 2033-91 S n2o CCGG 314.810 0.380 ... H4 2000 12 12 13 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129323 SPO 2000 09 15 08 15 00 2034-91 S n2o CCGG 314.790 0.380 ... H4 2000 12 12 13 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129324 SPO 2000 09 15 09 00 00 4093-91 P n2o CCGG 314.610 0.380 ... H4 2000 12 12 08 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129325 SPO 2000 09 15 09 00 00 4094-91 P n2o CCGG 314.280 0.380 ... H4 2000 12 12 08 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129326 SPO 2000 09 22 00 57 00 17-91 P n2o CCGG 314.450 0.380 ... H4 2000 12 12 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129327 SPO 2000 09 22 00 57 00 18-91 P n2o CCGG 314.460 0.380 ... H4 2000 12 12 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129328 SPO 2000 09 22 01 10 00 1997-91 P n2o CCGG 315.180 0.380 ... H4 2000 12 12 08 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129329 SPO 2000 09 22 01 10 00 1998-91 P n2o CCGG 315.040 0.380 ... H4 2000 12 12 08 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129330 SPO 2000 09 22 02 15 00 709-91 S n2o CCGG 315.100 0.380 ... H4 2000 12 11 15 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129331 SPO 2000 09 22 02 15 00 710-91 S n2o CCGG 314.840 0.380 ... H4 2000 12 11 15 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129332 SPO 2000 09 26 14 50 00 1077-91 P n2o CCGG 314.890 0.380 ... H4 2000 12 08 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129336 SPO 2000 09 26 14 50 00 45-91 P n2o CCGG 314.120 0.380 ... H4 2000 12 08 11 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129333 SPO 2000 09 26 14 50 00 46-91 P n2o CCGG 315.030 0.380 ... H4 2000 12 08 11 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129334 SPO 2000 09 26 14 50 00 546-91 P n2o CCGG 314.750 0.380 ... H4 2000 12 08 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129335 SPO 2000 10 01 22 15 00 433-91 S n2o CCGG 315.030 0.380 ... H4 2000 11 29 11 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129337 SPO 2000 10 01 22 15 00 434-91 S n2o CCGG 314.830 0.380 ... H4 2000 11 29 12 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129338 SPO 2000 10 01 23 00 00 157-91 P n2o CCGG 315.450 0.380 ... H4 2000 11 29 09 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129339 SPO 2000 10 01 23 00 00 158-91 P n2o CCGG 315.200 0.380 ... H4 2000 11 29 09 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129340 SPO 2000 10 15 03 15 00 4917-91 S n2o CCGG 315.490 0.380 ... H4 2000 11 29 12 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129341 SPO 2000 10 15 03 15 00 4918-91 S n2o CCGG 315.290 0.380 ... H4 2000 11 29 12 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129342 SPO 2000 10 15 03 45 00 177-91 P n2o CCGG 314.990 0.380 ... H4 2000 11 29 09 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129343 SPO 2000 10 15 03 45 00 178-91 P n2o CCGG 315.600 0.380 ... H4 2000 11 29 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129344 SPO 2000 10 23 08 15 00 4565-91 S n2o CCGG 315.390 0.380 ... H4 2000 11 29 10 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129345 SPO 2000 10 23 08 15 00 4566-91 S n2o CCGG 315.000 0.380 ... H4 2000 11 29 10 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129346 SPO 2000 10 30 19 18 00 129-98 S n2o CCGG 315.210 0.380 ... H4 2000 11 29 12 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129347 SPO 2000 10 30 19 18 00 130-98 S n2o CCGG 315.260 0.380 ... H4 2000 11 29 12 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129348 SPO 2000 10 30 20 23 00 4575-91 P n2o CCGG 315.130 0.380 ... H4 2000 11 29 11 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129349 SPO 2000 10 30 20 23 00 4576-91 P n2o CCGG 315.000 0.380 ... H4 2000 11 29 11 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129350 SPO 2000 11 01 07 10 00 4713-91 S n2o CCGG 315.190 0.380 ... H4 2000 12 21 11 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129351 SPO 2000 11 01 07 10 00 4714-91 S n2o CCGG 315.410 0.380 ... H4 2000 12 21 11 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129352 SPO 2000 11 01 08 22 00 4117-91 P n2o CCGG 314.800 0.380 ... H4 2000 12 21 12 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129353 SPO 2000 11 01 08 22 00 4118-91 P n2o CCGG 314.030 0.380 ... H4 2000 12 21 13 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129354 SPO 2000 11 07 01 23 00 1659-91 S n2o CCGG 315.120 0.380 ... H4 2000 12 21 11 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129355 SPO 2000 11 07 01 23 00 1660-91 S n2o CCGG 314.860 0.380 ... H4 2000 12 21 12 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129356 SPO 2000 11 07 02 07 00 729-91 P n2o CCGG 315.100 0.380 ... H4 2000 12 21 12 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129357 SPO 2000 11 07 02 07 00 730-91 P n2o CCGG 315.290 0.380 ... H4 2000 12 21 12 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129358 SPO 2000 11 16 02 23 00 4927-91 S n2o CCGG 315.270 0.380 ... H4 2000 12 21 08 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129359 SPO 2000 11 16 02 23 00 4928-91 S n2o CCGG 315.480 0.380 ... H4 2000 12 21 08 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129360 SPO 2000 11 16 02 42 00 1425-91 P n2o CCGG 315.480 0.380 ... H4 2000 12 21 09 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129361 SPO 2000 11 16 02 42 00 1426-91 P n2o CCGG 314.940 0.380 ... H4 2000 12 21 09 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129362 SPO 2000 11 22 00 22 00 43-98 S n2o CCGG 315.910 0.380 ... H4 2000 12 21 07 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129363 SPO 2000 11 22 00 22 00 44-98 S n2o CCGG 315.280 0.380 ... H4 2000 12 21 08 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129364 SPO 2000 11 22 00 40 00 4909-91 P n2o CCGG 314.930 0.380 ... H4 2000 12 21 08 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129365 SPO 2000 11 22 00 40 00 4910-91 P n2o CCGG 315.590 0.380 ... H4 2000 12 21 09 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129366 SPO 2000 12 02 02 19 00 4911-91 S n2o CCGG 314.940 0.380 ... H4 2001 01 17 11 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129367 SPO 2000 12 02 02 19 00 4912-91 S n2o CCGG 315.610 0.380 ... H4 2001 01 17 12 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129368 SPO 2000 12 02 02 23 00 4915-91 P n2o CCGG 315.250 0.380 ... H4 2001 01 17 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129369 SPO 2000 12 02 02 23 00 4916-91 P n2o CCGG 314.800 0.380 ... H4 2001 01 17 12 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129370 SPO 2000 12 07 21 24 00 4913-91 S n2o CCGG 315.550 0.380 ... H4 2001 01 17 12 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129371 SPO 2000 12 07 21 24 00 4914-91 S n2o CCGG 315.690 0.380 ... H4 2001 01 17 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129372 SPO 2000 12 07 22 01 00 4893-91 P n2o CCGG 315.160 0.380 ... H4 2001 01 17 10 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129373 SPO 2000 12 07 22 01 00 4894-91 P n2o CCGG 315.730 0.380 ... H4 2001 01 17 10 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129374 SPO 2000 12 15 18 15 00 4924-91 S n2o CCGG 315.170 0.380 ... H4 2001 01 17 11 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129375 SPO 2000 12 15 18 43 00 4929-91 P n2o CCGG 315.130 0.380 ... H4 2001 01 17 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129376 SPO 2000 12 15 18 43 00 4930-91 P n2o CCGG 315.100 0.380 ... H4 2001 01 17 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129377 SPO 2000 12 20 21 15 00 1174-91 S n2o CCGG 314.860 0.380 ... H4 2001 01 17 10 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129379 SPO 2000 12 20 21 15 00 135-91 S n2o CCGG 315.530 0.380 ... H4 2001 01 17 10 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129378 SPO 2000 12 20 21 20 00 4925-91 P n2o CCGG 315.170 0.380 ... H4 2001 01 17 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129380 SPO 2000 12 20 21 20 00 4926-91 P n2o CCGG 315.140 0.380 ... H4 2001 01 17 14 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129381 SPO 2000 12 29 03 49 00 100-99 P n2o CCGG 315.770 0.260 ... H4 2001 02 23 13 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129382 SPO 2000 12 29 03 49 00 101-99 P n2o CCGG 315.560 0.260 ... H4 2001 02 23 13 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129383 SPO 2001 01 01 01 21 00 97-99 S n2o CCGG 315.180 0.260 ... H4 2001 02 23 11 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129384 SPO 2001 01 01 01 21 00 98-99 S n2o CCGG 315.340 0.260 ... H4 2001 02 23 11 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129385 SPO 2001 01 01 02 36 00 95-99 P n2o CCGG 315.290 0.260 ... H4 2001 02 23 11 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129386 SPO 2001 01 01 02 36 00 96-99 P n2o CCGG 315.480 0.260 ... H4 2001 02 23 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129387 SPO 2001 01 09 20 23 00 102-99 P n2o CCGG 315.320 0.260 ... H4 2001 02 23 14 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129389 SPO 2001 01 09 20 23 00 99-99 P n2o CCGG 315.450 0.260 ... H4 2001 02 23 14 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129388 SPO 2001 01 15 19 19 00 43-99 S n2o CCGG 315.770 0.260 ... H4 2001 02 23 13 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129390 SPO 2001 01 15 19 19 00 44-99 S n2o CCGG 315.360 0.260 ... H4 2001 02 23 13 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129391 SPO 2001 01 15 19 40 00 41-99 P n2o CCGG 315.410 0.260 ... H4 2001 02 23 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129392 SPO 2001 01 15 19 40 00 42-99 P n2o CCGG 315.970 0.260 ... H4 2001 02 23 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129393 SPO 2001 01 23 05 14 00 47-99 S n2o CCGG 315.300 0.260 ... H4 2001 02 23 11 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129394 SPO 2001 01 23 05 14 00 48-99 S n2o CCGG 314.990 0.260 ... H4 2001 02 23 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129395 SPO 2001 01 23 05 35 00 45-99 P n2o CCGG 315.080 0.260 ... H4 2001 02 23 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129396 SPO 2001 01 23 05 35 00 46-99 P n2o CCGG 314.990 0.260 ... H4 2001 02 23 10 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129397 SPO 2001 02 01 16 22 00 89-99 P n2o CCGG 315.140 0.260 ... H4 2001 11 30 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129398 SPO 2001 02 01 16 22 00 90-99 P n2o CCGG 315.160 0.260 ... H4 2001 11 30 12 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129399 SPO 2001 02 01 17 17 00 87-99 S n2o CCGG 315.210 0.260 ... H4 2001 11 30 14 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129400 SPO 2001 02 01 17 17 00 88-99 S n2o CCGG 315.370 0.260 ... H4 2001 11 30 14 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129401 SPO 2001 02 07 20 54 00 91-99 P n2o CCGG 314.790 0.260 ... H4 2001 11 30 14 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129402 SPO 2001 02 07 20 54 00 92-99 P n2o CCGG 315.180 0.260 ... H4 2001 11 30 14 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129403 SPO 2001 02 15 19 24 00 109-99 S n2o CCGG 315.010 0.260 ... H4 2001 12 04 16 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129404 SPO 2001 02 15 19 24 00 110-99 S n2o CCGG 315.180 0.260 ... H4 2001 12 04 16 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129405 SPO 2001 02 15 19 54 00 93-99 P n2o CCGG 314.530 0.260 ... H4 2001 12 04 15 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129406 SPO 2001 02 15 19 54 00 94-99 P n2o CCGG 314.840 0.260 ... H4 2001 12 04 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129407 SPO 2001 02 26 21 08 00 111-99 P n2o CCGG 314.940 0.260 ... H4 2001 11 30 11 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129408 SPO 2001 02 26 21 08 00 112-99 P n2o CCGG 314.970 0.260 ... H4 2001 11 30 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129409 SPO 2001 03 01 19 19 00 115-99 S n2o CCGG 315.140 0.260 ... H4 2001 12 04 15 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129410 SPO 2001 03 01 19 19 00 116-99 S n2o CCGG 314.970 0.260 ... H4 2001 12 04 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129411 SPO 2001 03 01 20 47 00 113-99 P n2o CCGG 315.100 0.260 ... H4 2001 12 04 14 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129412 SPO 2001 03 01 20 47 00 114-99 P n2o CCGG 314.840 0.260 ... H4 2001 12 04 15 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129413 SPO 2001 03 09 21 18 00 4028-91 P n2o CCGG 314.740 0.260 ... H4 2001 11 30 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129415 SPO 2001 03 09 21 18 00 453-91 P n2o CCGG 315.190 0.260 ... H4 2001 11 30 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129414 SPO 2001 03 15 19 21 00 4167-91 S n2o CCGG 314.880 0.260 ... H4 2001 12 04 13 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129416 SPO 2001 03 15 19 21 00 4168-91 S n2o CCGG 314.890 0.260 ... H4 2001 12 04 13 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129417 SPO 2001 03 15 19 27 00 1597-91 P n2o CCGG 314.640 0.260 ... H4 2001 12 04 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129418 SPO 2001 03 15 19 27 00 1598-91 P n2o CCGG 314.680 0.260 ... H4 2001 12 04 14 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129419 SPO 2001 03 22 00 30 00 169-91 P n2o CCGG 314.890 0.260 ... H4 2001 11 30 09 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129420 SPO 2001 03 22 00 30 00 170-91 P n2o CCGG 314.410 0.260 ... H4 2001 11 30 09 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129421 SPO 2001 04 01 02 19 00 4767-91 S n2o CCGG 314.490 0.260 ... H4 2001 12 04 14 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129422 SPO 2001 04 01 02 19 00 4768-91 S n2o CCGG 314.470 0.260 ... H4 2001 12 04 14 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129423 SPO 2001 04 01 03 09 00 1519-91 P n2o CCGG 314.780 0.260 ... H4 2001 12 04 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129424 SPO 2001 04 01 03 09 00 1520-91 P n2o CCGG 314.480 0.260 ... H4 2001 12 04 13 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129425 SPO 2001 04 08 23 56 00 1563-91 P n2o CCGG 314.630 0.260 ... H4 2001 11 30 11 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129426 SPO 2001 04 08 23 56 00 1564-91 P n2o CCGG 314.430 0.260 ... H4 2001 11 30 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129427 SPO 2001 04 16 03 14 00 129-99 S n2o CCGG 314.550 0.260 ... H4 2001 11 30 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129428 SPO 2001 04 16 03 14 00 130-99 S n2o CCGG 314.710 0.260 ... H4 2001 11 30 15 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129429 SPO 2001 04 16 03 57 00 131-99 P n2o CCGG 313.840 0.260 .X. H4 2001 11 30 16 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129430 SPO 2001 04 16 03 57 00 132-99 P n2o CCGG 313.530 0.260 .X. H4 2001 11 30 16 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129431 SPO 2001 04 22 23 27 00 127-99 P n2o CCGG 314.690 0.260 ... H4 2001 12 03 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129432 SPO 2001 04 22 23 27 00 128-99 P n2o CCGG 314.730 0.260 ... H4 2001 12 03 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129433 SPO 2001 05 01 04 16 00 125-99 S n2o CCGG 314.480 0.260 ... H4 2001 11 30 15 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129434 SPO 2001 05 01 04 16 00 126-99 S n2o CCGG 314.670 0.260 ... H4 2001 11 30 15 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129435 SPO 2001 05 01 04 35 00 123-99 P n2o CCGG 314.690 0.260 ... H4 2001 12 03 10 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129436 SPO 2001 05 01 04 35 00 124-99 P n2o CCGG 314.010 0.260 ... H4 2001 12 03 10 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129437 SPO 2001 05 07 09 18 00 121-99 P n2o CCGG 314.650 0.260 ... H4 2001 12 03 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129438 SPO 2001 05 07 09 18 00 122-99 P n2o CCGG 314.370 0.260 ... H4 2001 12 03 14 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129439 SPO 2001 05 15 04 17 00 119-99 S n2o CCGG 314.840 0.260 ... H4 2001 12 03 15 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129440 SPO 2001 05 15 04 17 00 120-99 S n2o CCGG 314.610 0.260 ... H4 2001 12 03 15 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129441 SPO 2001 05 15 04 36 00 117-99 P n2o CCGG 314.430 0.260 ... H4 2001 12 03 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129442 SPO 2001 05 15 04 36 00 118-99 P n2o CCGG 315.110 0.260 ... H4 2001 12 03 15 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129443 SPO 2001 05 23 05 17 00 4201-91 P n2o CCGG 314.870 0.260 ... H4 2001 11 29 17 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129444 SPO 2001 05 23 05 17 00 4202-91 P n2o CCGG 315.270 0.260 ... H4 2001 11 29 17 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129445 SPO 2001 06 01 01 16 00 1859-91 S n2o CCGG 314.730 0.260 ... H4 2001 11 29 16 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129446 SPO 2001 06 01 01 16 00 1860-91 S n2o CCGG 315.060 0.260 ... H4 2001 11 29 16 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129447 SPO 2001 06 01 01 27 00 1353-91 P n2o CCGG 314.850 0.260 ... H4 2001 11 29 16 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129448 SPO 2001 06 01 01 27 00 1354-91 P n2o CCGG 314.360 0.260 ... H4 2001 11 29 17 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129449 SPO 2001 06 07 10 40 00 4043-91 P n2o CCGG 314.970 0.260 ... H4 2001 11 29 16 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129450 SPO 2001 06 07 10 40 00 4044-91 P n2o CCGG 315.100 0.260 ... H4 2001 11 29 16 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129451 SPO 2001 06 15 04 20 00 1495-91 S n2o CCGG 315.250 0.260 ... H4 2001 12 07 12 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129452 SPO 2001 06 15 04 20 00 1496-91 S n2o CCGG 315.100 0.260 ... H4 2001 12 07 12 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129453 SPO 2001 06 15 05 20 00 4221-91 P n2o CCGG 314.460 0.260 ... H4 2001 12 07 11 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129454 SPO 2001 06 15 05 20 00 4222-91 P n2o CCGG 314.790 0.260 ... H4 2001 12 07 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129455 SPO 2001 06 15 05 20 00 4222-91 P n2o CCGG 314.870 0.260 ... H4 2001 12 07 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129455 SPO 2001 06 21 04 26 00 387-91 P n2o CCGG 315.140 0.260 ... H4 2001 12 07 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129456 SPO 2001 06 21 04 26 00 388-91 P n2o CCGG 315.110 0.260 ... H4 2001 12 07 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129457 SPO 2001 07 01 05 24 00 19-99 S n2o CCGG 314.930 0.260 ... H4 2001 12 03 11 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129458 SPO 2001 07 01 05 24 00 20-99 S n2o CCGG 315.180 0.260 ... H4 2001 12 03 11 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129459 SPO 2001 07 01 06 17 00 15-99 P n2o CCGG 315.270 0.260 ... H4 2001 12 03 11 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129460 SPO 2001 07 01 06 17 00 18-99 P n2o CCGG 314.460 0.260 ... H4 2001 12 03 12 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129461 SPO 2001 07 08 13 32 00 21-99 P n2o CCGG 315.170 0.260 ... H4 2001 12 03 09 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129462 SPO 2001 07 08 13 32 00 22-99 P n2o CCGG 314.760 0.260 ... H4 2001 12 03 09 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129463 SPO 2001 07 16 02 16 00 25-99 S n2o CCGG 315.330 0.260 ... H4 2001 12 03 12 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129464 SPO 2001 07 16 02 16 00 26-99 S n2o CCGG 315.410 0.260 ... H4 2001 12 03 12 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129465 SPO 2001 07 16 02 58 00 23-99 P n2o CCGG 315.340 0.260 ... H4 2001 12 03 13 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129466 SPO 2001 07 16 02 58 00 24-99 P n2o CCGG 314.900 0.260 ... H4 2001 12 03 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129467 SPO 2001 07 24 05 51 00 51-99 P n2o CCGG 314.820 0.260 ... H4 2001 12 03 10 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129468 SPO 2001 07 24 05 51 00 52-99 P n2o CCGG 315.430 0.260 ... H4 2001 12 03 10 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129469 SPO 2001 08 01 03 14 00 1173-91 S n2o CCGG 315.830 0.260 ... H4 2001 12 03 11 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129471 SPO 2001 08 01 03 14 00 17-99 S n2o CCGG 315.510 0.260 ... H4 2001 12 03 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129470 SPO 2001 08 01 04 50 00 29-99 P n2o CCGG 315.560 0.260 ... H4 2001 12 03 13 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129472 SPO 2001 08 01 04 50 00 30-99 P n2o CCGG 315.460 0.260 ... H4 2001 12 03 13 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129473 SPO 2001 08 08 11 20 00 39-99 P n2o CCGG 315.610 0.260 ... H4 2001 12 04 12 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129474 SPO 2001 08 08 11 20 00 40-99 P n2o CCGG 314.990 0.260 ... H4 2001 12 04 12 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129475 SPO 2001 08 15 02 28 00 37-99 S n2o CCGG 315.340 0.260 ... H4 2001 11 30 10 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129476 SPO 2001 08 15 02 28 00 38-99 S n2o CCGG 315.470 0.260 ... H4 2001 11 30 10 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129477 SPO 2001 08 15 03 05 00 1-99 P n2o CCGG 315.120 0.260 ... H4 2001 11 30 10 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129478 SPO 2001 08 15 03 05 00 2-99 P n2o CCGG 315.100 0.260 ... H4 2001 11 30 11 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129479 SPO 2001 08 22 04 55 00 49-99 P n2o CCGG 315.760 0.260 ... H4 2001 12 04 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129480 SPO 2001 08 22 04 55 00 50-99 P n2o CCGG 315.710 0.260 ... H4 2001 12 04 11 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129481 SPO 2001 09 01 06 13 00 55-99 S n2o CCGG 315.860 0.260 ... H4 2001 11 30 10 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129482 SPO 2001 09 01 06 13 00 56-99 S n2o CCGG 315.650 0.260 ... H4 2001 11 30 10 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129483 SPO 2001 09 01 07 35 00 53-99 P n2o CCGG 314.930 0.260 ... H4 2001 11 30 09 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129484 SPO 2001 09 01 07 35 00 54-99 P n2o CCGG 315.510 0.260 ... H4 2001 11 30 09 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129485 SPO 2001 09 08 07 25 00 57-99 P n2o CCGG 315.330 0.260 ... H4 2001 12 04 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129486 SPO 2001 09 08 07 25 00 58-99 P n2o CCGG 315.270 0.260 ... H4 2001 12 04 11 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129487 SPO 2001 09 15 10 18 00 61-99 S n2o CCGG 315.890 0.260 ... H4 2001 12 03 14 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129488 SPO 2001 09 15 10 18 00 62-99 S n2o CCGG 315.690 0.260 ... H4 2001 12 03 14 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129489 SPO 2001 09 15 12 05 00 73-99 P n2o CCGG 315.730 0.260 ... H4 2001 12 03 15 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129490 SPO 2001 09 15 12 05 00 74-99 P n2o CCGG 315.310 0.260 ... H4 2001 12 03 16 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129491 SPO 2001 09 21 08 45 00 77-99 P n2o CCGG 315.380 0.260 ... H4 2001 12 04 16 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129492 SPO 2001 09 21 08 45 00 78-99 P n2o CCGG 315.240 0.260 ... H4 2001 12 04 16 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129493 SPO 2001 10 01 09 26 00 107-99 S n2o CCGG 315.940 0.260 ... H4 2001 12 03 16 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129494 SPO 2001 10 01 09 26 00 108-99 S n2o CCGG 316.050 0.260 ... H4 2001 12 03 16 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129495 SPO 2001 10 01 10 52 00 75-99 P n2o CCGG 316.240 0.260 ... H4 2001 12 04 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129496 SPO 2001 10 01 10 52 00 76-99 P n2o CCGG 315.870 0.260 ... H4 2001 12 04 12 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129497 SPO 2001 10 08 12 47 00 71-99 P n2o CCGG 315.730 0.260 ... H4 2001 12 04 17 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129498 SPO 2001 10 08 12 47 00 72-99 P n2o CCGG 315.980 0.260 ... H4 2001 12 04 17 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129499 SPO 2001 10 15 02 13 00 103-99 S n2o CCGG 315.810 0.260 ... H4 2001 12 05 09 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129500 SPO 2001 10 15 02 13 00 104-99 S n2o CCGG 315.920 0.260 ... H4 2001 12 05 10 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129501 SPO 2001 10 15 04 05 00 105-99 P n2o CCGG 315.700 0.260 ... H4 2001 12 05 10 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129502 SPO 2001 10 15 04 05 00 106-99 P n2o CCGG 315.830 0.260 ... H4 2001 12 05 10 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129503 SPO 2001 10 22 03 43 00 101-99 P n2o CCGG 316.000 0.260 ... H4 2001 12 07 10 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129504 SPO 2001 10 22 03 43 00 102-99 P n2o CCGG 315.630 0.260 ... H4 2001 12 07 10 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129505 SPO 2001 10 30 23 20 00 67-99 S n2o CCGG 316.140 0.260 ... H4 2002 01 11 09 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129506 SPO 2001 10 30 23 20 00 68-99 S n2o CCGG 316.320 0.260 ... H4 2002 01 11 09 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129507 SPO 2001 10 31 00 21 00 69-99 P n2o CCGG 315.750 0.260 ... H4 2002 01 11 09 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129508 SPO 2001 10 31 00 21 00 70-99 P n2o CCGG 315.940 0.260 ... H4 2002 01 11 09 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129509 SPO 2001 11 15 23 17 00 35-99 S n2o CCGG 316.380 0.260 ... H4 2002 01 11 12 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129510 SPO 2001 11 15 23 17 00 36-99 S n2o CCGG 316.310 0.260 ... H4 2002 01 11 12 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129511 SPO 2001 11 15 23 33 00 27-99 P n2o CCGG 315.630 0.260 ... H4 2002 01 11 11 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129512 SPO 2001 11 15 23 33 00 28-99 P n2o CCGG 315.800 0.260 ... H4 2002 01 11 11 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129513 SPO 2001 11 22 20 52 00 31-99 P n2o CCGG 315.810 0.260 ... H4 2002 01 11 11 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129514 SPO 2001 11 22 20 52 00 32-99 P n2o CCGG 315.910 0.260 ... H4 2002 01 11 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129515 SPO 2001 11 30 00 52 00 63-99 P n2o CCGG 316.120 0.260 ... H4 2002 01 11 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129516 SPO 2001 11 30 00 52 00 64-99 P n2o CCGG 316.950 0.260 ... H4 2002 01 11 10 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129517 SPO 2001 11 30 01 09 00 65-99 S n2o CCGG 316.080 0.260 ... H4 2002 01 11 10 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129518 SPO 2001 11 30 01 09 00 66-99 S n2o CCGG 316.160 0.260 ... H4 2002 01 11 10 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129519 SPO 2001 12 08 21 24 00 85-99 P n2o CCGG 316.120 0.260 ... H4 2002 02 19 13 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129520 SPO 2001 12 08 21 24 00 86-99 P n2o CCGG 316.240 0.260 ... H4 2002 02 19 13 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129521 SPO 2001 12 15 20 22 00 7-99 S n2o CCGG 316.290 0.260 ... H4 2002 02 19 10 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129522 SPO 2001 12 15 20 22 00 8-99 S n2o CCGG 316.550 0.260 ... H4 2002 02 19 11 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129523 SPO 2001 12 15 20 29 00 83-99 P n2o CCGG 316.040 0.260 ... H4 2002 02 19 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129524 SPO 2001 12 15 20 29 00 84-99 P n2o CCGG 316.010 0.260 ... H4 2002 02 19 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129525 SPO 2001 12 21 11 00 00 59-99 P n2o CCGG 316.100 0.260 ... H4 2002 02 14 12 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129526 SPO 2001 12 21 11 00 00 60-99 P n2o CCGG 316.440 0.260 ... H4 2002 02 14 13 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129527 SPO 2001 12 28 08 20 00 79-99 P n2o CCGG 315.860 0.260 ... H4 2002 02 19 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129528 SPO 2001 12 28 08 20 00 80-99 P n2o CCGG 315.580 0.260 ... H4 2002 02 19 11 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129529 SPO 2002 01 02 08 20 00 5-99 S n2o CCGG 316.290 0.260 ... H4 2002 02 14 10 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129530 SPO 2002 01 02 08 20 00 6-99 S n2o CCGG 316.550 0.260 ... H4 2002 02 14 10 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129531 SPO 2002 01 02 09 13 00 81-99 P n2o CCGG 316.340 0.260 ... H4 2002 02 14 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129532 SPO 2002 01 02 09 13 00 82-99 P n2o CCGG 316.450 0.260 ... H4 2002 02 14 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129533 SPO 2002 01 15 22 38 00 4439-91 P n2o CCGG 315.970 0.260 ... H4 2002 12 23 10 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129534 SPO 2002 01 15 22 38 00 4440-91 P n2o CCGG 316.220 0.260 ... H4 2002 12 23 11 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129535 SPO 2002 01 15 23 23 00 489-99 S n2o CCGG 315.780 0.260 ... H4 2002 12 23 11 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129536 SPO 2002 01 15 23 23 00 490-99 S n2o CCGG 315.510 0.260 ... H4 2002 12 23 11 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129537 SPO 2002 01 22 08 26 00 471-99 P n2o CCGG 315.380 0.260 ... H4 2002 12 23 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129538 SPO 2002 01 22 08 26 00 472-99 P n2o CCGG 315.440 0.260 ... H4 2002 12 23 10 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129539 SPO 2002 02 03 02 27 00 473-99 S n2o CCGG 316.410 0.260 ... H4 2002 12 31 13 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129540 SPO 2002 02 03 02 27 00 474-99 S n2o CCGG 315.760 0.260 ... H4 2002 12 31 13 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129541 SPO 2002 02 03 02 35 00 487-91 P n2o CCGG 315.080 0.260 ... H4 2002 12 23 10 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129542 SPO 2002 02 03 02 35 00 488-91 P n2o CCGG 315.360 0.260 ... H4 2002 12 23 10 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129543 SPO 2002 02 08 04 20 00 4379-91 P n2o CCGG 315.480 0.260 ... H4 2002 12 31 13 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129544 SPO 2002 02 08 04 20 00 4380-91 P n2o CCGG 316.270 0.260 ... H4 2002 12 31 14 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129545 SPO 2002 02 13 04 15 00 1935-91 S n2o CCGG 315.890 0.260 ... H4 2002 12 31 13 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129546 SPO 2002 02 13 04 15 00 1936-91 S n2o CCGG 315.510 0.260 ... H4 2002 12 31 13 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129547 SPO 2002 02 13 04 30 00 487-99 P n2o CCGG 315.580 0.260 ... H4 2002 12 31 14 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129548 SPO 2002 02 13 04 30 00 488-99 P n2o CCGG 315.940 0.260 ... H4 2002 12 31 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129549 SPO 2002 02 23 22 58 00 1297-91 P n2o CCGG 316.350 0.260 ... H4 2002 12 31 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129550 SPO 2002 02 23 22 58 00 1298-91 P n2o CCGG 315.760 0.260 ... H4 2002 12 31 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129551 SPO 2002 02 23 23 58 00 217-99 P n2o CCGG 315.630 0.260 ... H4 2002 12 31 12 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129552 SPO 2002 02 23 23 58 00 218-99 P n2o CCGG 315.660 0.260 ... H4 2002 12 31 12 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129553 SPO 2002 03 01 08 01 00 17-91 P n2o CCGG 315.840 0.260 ... H4 2002 12 31 12 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129554 SPO 2002 03 01 08 01 00 18-91 P n2o CCGG 315.950 0.260 ... H4 2002 12 31 12 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129555 SPO 2002 03 01 08 16 00 291-91 S n2o CCGG 315.850 0.260 ... H4 2002 12 31 11 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129556 SPO 2002 03 01 08 16 00 292-91 S n2o CCGG 316.350 0.260 ... H4 2002 12 31 11 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129557 SPO 2002 03 08 08 25 00 1637-91 P n2o CCGG 315.650 0.260 ... H4 2002 12 20 10 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129558 SPO 2002 03 08 08 25 00 1638-91 P n2o CCGG 315.720 0.260 ... H4 2002 12 20 10 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129559 SPO 2002 03 16 05 15 00 1851-91 S n2o CCGG 315.650 0.260 ... H4 2002 12 20 10 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129560 SPO 2002 03 16 05 15 00 1852-91 S n2o CCGG 315.650 0.260 ... H4 2002 12 20 10 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129561 SPO 2002 03 16 05 27 00 59-91 P n2o CCGG 315.600 0.260 ... H4 2002 12 20 09 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129562 SPO 2002 03 16 05 27 00 60-91 P n2o CCGG 315.340 0.260 ... H4 2002 12 20 09 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129563 SPO 2002 03 23 07 40 00 703-91 P n2o CCGG 315.590 0.260 ... H4 2002 12 20 09 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129564 SPO 2002 03 23 07 40 00 704-91 P n2o CCGG 316.910 0.260 N.. H4 2002 12 20 09 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129565 SPO 2002 03 30 10 00 00 1603-91 P n2o CCGG 315.030 0.260 ... H4 2002 12 20 13 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129566 SPO 2002 03 30 10 00 00 1604-91 P n2o CCGG 315.540 0.260 ... H4 2002 12 20 13 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129567 SPO 2002 04 01 18 12 00 395-99 P n2o CCGG 315.720 0.260 ... H4 2002 12 20 11 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129568 SPO 2002 04 01 18 12 00 396-99 P n2o CCGG 315.090 0.260 ... H4 2002 12 20 11 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129569 SPO 2002 04 01 18 15 00 4019-91 S n2o CCGG 315.710 0.260 ... H4 2002 12 18 16 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129570 SPO 2002 04 01 18 15 00 4020-91 S n2o CCGG 315.920 0.260 ... H4 2002 12 18 17 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129571 SPO 2002 04 12 18 50 00 491-99 P n2o CCGG 314.760 0.260 ... H4 2003 01 03 09 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129572 SPO 2002 04 12 18 50 00 492-99 P n2o CCGG 314.760 0.260 ... H4 2003 01 03 09 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129573 SPO 2002 04 18 16 14 00 495-99 S n2o CCGG 315.580 0.260 ... H4 2003 01 02 16 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129574 SPO 2002 04 18 16 14 00 496-99 S n2o CCGG 315.070 0.260 ... H4 2003 01 02 16 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129575 SPO 2002 04 18 16 27 00 265-99 P n2o CCGG 314.960 0.260 ... H4 2003 01 03 09 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129576 SPO 2002 04 18 16 27 00 266-99 P n2o CCGG 315.250 0.260 ... H4 2003 01 03 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129577 SPO 2002 04 28 13 25 00 359-99 P n2o CCGG 315.030 0.260 ... H4 2003 01 03 09 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129578 SPO 2002 04 28 13 25 00 360-99 P n2o CCGG 315.130 0.260 ... H4 2003 01 03 09 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129579 SPO 2002 05 01 15 13 00 107-98 P n2o CCGG 315.430 0.260 ... H4 2002 12 19 14 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129580 SPO 2002 05 01 15 13 00 108-98 P n2o CCGG 315.950 0.260 ... H4 2002 12 19 14 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129581 SPO 2002 05 01 15 30 00 4325-91 P n2o CCGG 315.780 0.260 ... H4 2002 12 19 13 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129582 SPO 2002 05 01 15 30 00 4326-91 P n2o CCGG 314.850 0.260 ... H4 2002 12 19 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129583 SPO 2002 05 11 03 05 00 777-91 P n2o CCGG 315.240 0.260 ... H4 2002 12 19 11 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129584 SPO 2002 05 11 03 05 00 778-91 P n2o CCGG 315.260 0.260 ... H4 2002 12 19 11 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129585 SPO 2002 05 16 09 13 00 1703-91 S n2o CCGG 315.610 0.260 ... H4 2002 12 31 15 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129586 SPO 2002 05 16 09 13 00 1704-91 S n2o CCGG 315.410 0.260 ... H4 2002 12 31 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129587 SPO 2002 05 16 09 35 00 4531-91 P n2o CCGG 315.340 0.260 ... H4 2002 12 19 11 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129588 SPO 2002 05 16 09 35 00 4532-91 P n2o CCGG 314.740 0.260 ... H4 2002 12 19 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129589 SPO 2002 05 27 16 25 00 4733-91 P n2o CCGG 315.030 0.260 ... H4 2003 01 02 10 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129590 SPO 2002 05 27 16 25 00 4734-91 P n2o CCGG 315.460 0.260 ... H4 2003 01 02 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129591 SPO 2002 06 01 21 13 00 377-91 S n2o CCGG 315.670 0.260 ... H4 2002 12 31 14 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129592 SPO 2002 06 01 21 13 00 378-91 S n2o CCGG 315.090 0.260 ... H4 2002 12 31 15 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129593 SPO 2002 06 01 21 30 00 151-99 P n2o CCGG 314.780 0.260 ... H4 2002 12 18 12 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129594 SPO 2002 06 01 21 30 00 152-99 P n2o CCGG 315.080 0.260 ... H4 2002 12 18 12 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129595 SPO 2002 06 07 07 15 00 4821-91 P n2o CCGG 315.440 0.260 ... H4 2002 12 18 11 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129596 SPO 2002 06 07 07 15 00 4822-91 P n2o CCGG 315.310 0.260 ... H4 2002 12 18 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129597 SPO 2002 06 15 15 10 00 517-91 S n2o CCGG 315.630 0.260 ... H4 2002 12 18 11 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129598 SPO 2002 06 15 15 10 00 518-91 S n2o CCGG 315.470 0.260 ... H4 2002 12 18 11 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129599 SPO 2002 06 15 15 30 00 4485-91 P n2o CCGG 315.670 0.260 ... H4 2002 12 18 12 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129600 SPO 2002 06 15 15 30 00 4486-91 P n2o CCGG 315.270 0.260 ... H4 2002 12 18 13 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129601 SPO 2002 06 21 17 10 00 4329-91 P n2o CCGG 315.180 0.260 ... H4 2002 12 19 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129602 SPO 2002 06 21 17 10 00 4330-91 P n2o CCGG 314.790 0.260 ... H4 2002 12 19 15 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129603 SPO 2002 06 29 07 45 00 79-98 P n2o CCGG 315.430 0.260 ... H4 2002 12 19 16 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129604 SPO 2002 06 29 07 45 00 80-98 P n2o CCGG 316.080 0.260 ... H4 2002 12 19 16 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129605 SPO 2002 07 01 05 25 00 413-99 S n2o CCGG 315.100 0.260 ... H4 2002 12 19 14 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129606 SPO 2002 07 01 05 25 00 414-99 S n2o CCGG 315.310 0.260 ... H4 2002 12 19 14 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129607 SPO 2002 07 01 05 45 00 1815-91 P n2o CCGG 315.080 0.260 ... H4 2002 12 19 15 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129608 SPO 2002 07 01 05 45 00 1816-91 P n2o CCGG 315.800 0.260 ... H4 2002 12 19 15 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129609 SPO 2002 07 05 02 45 00 275-99 P n2o CCGG 315.770 0.260 ... H4 2002 12 18 13 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129610 SPO 2002 07 05 02 45 00 276-99 P n2o CCGG 315.490 0.260 ... H4 2002 12 18 13 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129611 SPO 2002 07 15 14 12 00 483-91 S n2o CCGG 315.450 0.260 ... H4 2002 12 18 14 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129612 SPO 2002 07 15 14 12 00 484-91 S n2o CCGG 315.770 0.260 ... H4 2002 12 18 14 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129613 SPO 2002 07 15 14 20 00 379-99 P n2o CCGG 315.050 0.260 ... H4 2002 12 18 13 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129614 SPO 2002 07 15 14 20 00 380-99 P n2o CCGG 315.520 0.260 ... H4 2002 12 18 13 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129615 SPO 2002 07 19 19 50 00 315-99 P n2o CCGG 315.370 0.260 ... H4 2002 12 18 14 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129616 SPO 2002 07 19 19 50 00 316-99 P n2o CCGG 315.410 0.260 ... H4 2002 12 18 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129617 SPO 2002 07 26 22 55 00 467-99 P n2o CCGG 315.850 0.260 ... H4 2002 12 18 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129618 SPO 2002 07 26 22 55 00 468-99 P n2o CCGG 315.600 0.260 ... H4 2002 12 18 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129619 SPO 2002 08 01 09 02 00 465-99 S n2o CCGG 315.970 0.260 ... H4 2002 12 18 16 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129620 SPO 2002 08 01 09 02 00 466-99 S n2o CCGG 315.350 0.260 ... H4 2002 12 18 16 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129621 SPO 2002 08 01 09 15 00 469-99 P n2o CCGG 315.460 0.260 ... H4 2002 12 18 16 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129622 SPO 2002 08 01 09 15 00 470-99 P n2o CCGG 315.540 0.260 ... H4 2002 12 18 16 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129623 SPO 2002 08 10 04 45 00 463-99 P n2o CCGG 315.450 0.260 ... H4 2002 12 18 15 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129624 SPO 2002 08 10 04 45 00 464-99 P n2o CCGG 315.440 0.260 ... H4 2002 12 18 15 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129625 SPO 2002 08 15 03 04 00 1459-91 S n2o CCGG 316.680 0.260 ... H4 2003 01 02 15 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129626 SPO 2002 08 15 03 04 00 1460-91 S n2o CCGG 315.960 0.260 ... H4 2003 01 02 15 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129627 SPO 2002 08 15 03 15 00 1011-91 P n2o CCGG 316.020 0.260 ... H4 2003 01 02 15 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129628 SPO 2002 08 15 03 15 00 1012-91 P n2o CCGG 315.690 0.260 ... H4 2003 01 02 15 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129629 SPO 2002 08 23 03 45 00 287-91 P n2o CCGG 317.270 0.260 N.. H4 2003 01 02 14 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129630 SPO 2002 08 23 03 45 00 288-91 P n2o CCGG 316.200 0.260 ... H4 2003 01 02 14 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129631 SPO 2002 08 30 06 50 00 4265-91 P n2o CCGG 315.990 0.260 ... H4 2003 01 02 16 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129632 SPO 2002 08 30 06 50 00 4266-91 P n2o CCGG 315.920 0.260 ... H4 2003 01 02 16 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129633 SPO 2002 09 02 22 11 00 4431-91 S n2o CCGG 316.310 0.260 ... H4 2003 01 02 12 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129634 SPO 2002 09 02 22 11 00 4432-91 S n2o CCGG 316.320 0.260 ... H4 2003 01 02 12 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129635 SPO 2002 09 02 22 23 00 355-99 P n2o CCGG 316.040 0.260 ... H4 2003 01 02 11 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129636 SPO 2002 09 02 22 23 00 356-99 P n2o CCGG 316.260 0.260 ... H4 2003 01 02 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129637 SPO 2002 09 09 23 55 00 695-91 P n2o CCGG 316.410 0.260 ... H4 2003 01 02 11 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129638 SPO 2002 09 09 23 55 00 696-91 P n2o CCGG 316.270 0.260 ... H4 2003 01 02 11 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129639 SPO 2002 09 17 02 51 00 85-91 S n2o CCGG 316.070 0.260 ... H4 2003 01 03 13 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129640 SPO 2002 09 17 02 51 00 86-91 S n2o CCGG 315.700 0.260 ... H4 2003 01 03 13 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129641 SPO 2002 09 17 03 08 00 1689-91 P n2o CCGG 316.190 0.260 ... H4 2003 01 02 12 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129642 SPO 2002 09 17 03 08 00 1690-91 P n2o CCGG 315.940 0.260 ... H4 2003 01 02 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129643 SPO 2002 09 20 09 45 00 1697-91 P n2o CCGG 316.360 0.260 ... H4 2003 01 03 13 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129644 SPO 2002 09 20 09 45 00 1698-91 P n2o CCGG 316.160 0.260 ... H4 2003 01 03 13 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129645 SPO 2002 09 27 08 15 00 4195-91 P n2o CCGG 316.500 0.260 ... H4 2003 01 03 10 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129646 SPO 2002 09 27 08 15 00 4196-91 P n2o CCGG 315.650 0.260 ... H4 2003 01 03 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129647 SPO 2002 10 01 16 11 00 4835-91 S n2o CCGG 316.040 0.260 ... H4 2003 01 02 13 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129648 SPO 2002 10 01 16 11 00 4836-91 S n2o CCGG 316.050 0.260 ... H4 2003 01 02 13 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129649 SPO 2002 10 01 16 15 00 4611-91 P n2o CCGG 315.950 0.260 ... H4 2003 01 03 10 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129650 SPO 2002 10 01 16 15 00 4612-91 P n2o CCGG 316.040 0.260 ... H4 2003 01 03 11 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129651 SPO 2002 10 06 05 45 00 4253-91 P n2o CCGG 315.780 0.260 ... H4 2003 01 02 14 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129652 SPO 2002 10 06 05 45 00 4254-91 P n2o CCGG 316.010 0.260 ... H4 2003 01 02 14 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129653 SPO 2002 10 11 07 36 00 1133-91 P n2o CCGG 316.200 0.260 ... H4 2003 01 02 13 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129654 SPO 2002 10 11 07 36 00 1134-91 P n2o CCGG 316.470 0.260 ... H4 2003 01 02 13 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129655 SPO 2002 10 15 06 01 00 97-91 S n2o CCGG 315.760 0.260 ... H4 2002 12 30 12 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129656 SPO 2002 10 15 06 01 00 98-91 S n2o CCGG 316.370 0.260 ... H4 2002 12 30 12 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129657 SPO 2002 10 15 06 12 00 4663-91 P n2o CCGG 315.880 0.260 ... H4 2003 01 02 13 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129658 SPO 2002 10 15 06 12 00 4664-91 P n2o CCGG 316.320 0.260 ... H4 2003 01 02 14 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129659 SPO 2002 10 25 06 26 00 389-99 P n2o CCGG 315.540 0.260 ... H4 2002 12 30 11 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129660 SPO 2002 10 25 06 26 00 390-99 P n2o CCGG 316.640 0.260 ... H4 2002 12 30 11 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129661 SPO 2002 11 02 23 21 00 461-99 S n2o CCGG 316.170 0.260 ... H4 2002 12 30 11 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129662 SPO 2002 11 02 23 21 00 462-99 S n2o CCGG 315.700 0.260 ... H4 2002 12 30 11 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129663 SPO 2002 11 02 23 38 00 1639-91 P n2o CCGG 316.630 0.260 ... H4 2002 12 30 12 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129664 SPO 2002 11 02 23 38 00 1640-91 P n2o CCGG 316.350 0.260 ... H4 2002 12 30 12 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129665 SPO 2002 11 08 03 54 00 4559-91 P n2o CCGG 316.100 0.260 ... H4 2002 12 30 10 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129666 SPO 2002 11 08 03 54 00 4560-91 P n2o CCGG 316.320 0.260 ... H4 2002 12 30 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129667 SPO 2002 11 18 23 23 00 4455-91 S n2o CCGG 316.790 0.260 ... H4 2002 12 30 09 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129668 SPO 2002 11 18 23 23 00 4456-91 S n2o CCGG 316.640 0.260 ... H4 2002 12 30 09 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129669 SPO 2002 11 18 23 26 00 4753-91 P n2o CCGG 316.640 0.260 ... H4 2002 12 30 13 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129670 SPO 2002 11 18 23 26 00 4754-91 P n2o CCGG 316.180 0.260 ... H4 2002 12 30 13 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129671 SPO 2002 11 24 00 35 00 631-91 P n2o CCGG 316.270 0.260 ... H4 2002 12 30 12 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129672 SPO 2002 11 24 00 35 00 632-91 P n2o CCGG 316.340 0.260 ... H4 2002 12 30 13 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129673 SPO 2002 11 29 04 26 00 1277-91 P n2o CCGG 316.200 0.260 ... H4 2003 01 24 13 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129674 SPO 2002 11 29 04 26 00 1278-91 P n2o CCGG 316.110 0.260 ... H4 2003 01 24 13 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129675 SPO 2002 12 03 03 39 00 1005-91 P n2o CCGG 316.430 0.260 ... H4 2003 01 24 13 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129676 SPO 2002 12 03 03 39 00 1006-91 P n2o CCGG 316.010 0.260 ... H4 2003 01 24 13 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129677 SPO 2002 12 03 04 10 00 357-99 S n2o CCGG 316.610 0.260 ... H4 2003 01 24 12 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129678 SPO 2002 12 03 04 10 00 358-99 S n2o CCGG 316.080 0.260 ... H4 2003 01 24 12 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129679 SPO 2002 12 14 07 58 00 401-99 P n2o CCGG 316.390 0.260 ... H4 2003 01 24 12 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129680 SPO 2002 12 14 07 58 00 402-99 P n2o CCGG 316.510 0.260 ... H4 2003 01 24 13 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129681 SPO 2002 12 17 02 05 00 445-99 S n2o CCGG 316.170 0.260 ... H4 2003 01 23 12 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129682 SPO 2002 12 17 02 05 00 446-99 S n2o CCGG 316.180 0.260 ... H4 2003 01 23 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129683 SPO 2002 12 17 02 32 00 385-99 P n2o CCGG 316.390 0.260 ... H4 2003 01 23 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129684 SPO 2002 12 17 02 32 00 386-99 P n2o CCGG 316.230 0.260 ... H4 2003 01 23 14 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129685 SPO 2002 12 27 03 21 00 4313-91 P n2o CCGG 316.710 0.260 ... H4 2003 01 23 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129686 SPO 2002 12 27 03 21 00 4314-91 P n2o CCGG 316.350 0.260 ... H4 2003 01 23 12 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129687 SPO 2003 01 04 07 52 00 383-99 S n2o CCGG 316.180 0.260 ... H4 2003 01 23 14 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129688 SPO 2003 01 04 07 52 00 384-99 S n2o CCGG 316.150 0.260 ... H4 2003 01 23 14 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129689 SPO 2003 01 04 08 10 00 6047-66 P n2o CCGG 315.730 0.260 ... H4 2003 02 27 17 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129690 SPO 2003 01 04 08 10 00 6048-66 P n2o CCGG 315.830 0.260 ... H4 2003 02 27 17 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129691 SPO 2003 01 11 00 51 00 6345-66 P n2o CCGG 316.100 0.260 ... H4 2003 02 27 16 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129692 SPO 2003 01 11 00 51 00 6346-66 P n2o CCGG 316.170 0.260 ... H4 2003 02 27 16 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129693 SPO 2003 01 16 02 12 00 6899-66 S n2o CCGG 316.660 0.260 ... H4 2003 02 27 16 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129694 SPO 2003 01 16 02 12 00 6900-66 S n2o CCGG 316.290 0.260 ... H4 2003 02 27 16 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129695 SPO 2003 01 16 02 17 00 6183-66 P n2o CCGG 316.470 0.260 ... H4 2003 02 27 17 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129696 SPO 2003 01 16 02 17 00 6184-66 P n2o CCGG 315.960 0.260 ... H4 2003 02 27 17 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129697 SPO 2003 01 16 04 32 00 1105-91 P n2o CCGG 315.920 0.260 ... H4 2003 02 27 14 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129698 SPO 2003 01 16 04 32 00 1106-91 P n2o CCGG 315.170 0.260 ... H4 2003 02 27 14 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129699 SPO 2003 01 23 04 24 00 661-91 P n2o CCGG 316.530 0.260 ... H4 2003 02 27 12 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129700 SPO 2003 01 23 04 24 00 662-91 P n2o CCGG 315.490 0.260 ... H4 2003 02 27 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129701 SPO 2003 01 23 04 58 00 1007-91 P n2o CCGG 315.700 0.260 ... H4 2003 02 27 13 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129702 SPO 2003 01 23 04 58 00 1008-91 P n2o CCGG 315.830 0.260 ... H4 2003 02 27 13 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129703 SPO 2003 02 01 03 17 00 6637-66 S n2o CCGG 316.010 0.260 ... H4 2003 02 27 13 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129704 SPO 2003 02 01 03 17 00 6638-66 S n2o CCGG 317.120 0.260 ... H4 2003 02 27 13 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129705 SPO 2003 02 01 03 21 00 1945-91 P n2o CCGG 236.090 -999.990 N.. H4 2003 12 11 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129706 SPO 2003 02 01 03 21 00 1945-91 P n2o CCGG -999.990 -999.990 N.. H4 2003 12 17 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129706 SPO 2003 02 01 03 21 00 1946-91 P n2o CCGG 314.290 0.260 A.. H4 2003 12 11 10 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129707 SPO 2003 02 01 03 21 00 1946-91 P n2o CCGG 316.190 0.260 A.. H4 2003 12 17 14 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129707 SPO 2003 02 07 07 00 00 6577-66 P n2o CCGG 316.150 0.260 ... H4 2003 12 11 11 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129708 SPO 2003 02 07 07 00 00 6578-66 P n2o CCGG 316.090 0.260 ... H4 2003 12 11 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129709 SPO 2003 02 14 05 50 00 6279-66 P n2o CCGG 315.690 0.260 ... H4 2003 12 11 11 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129710 SPO 2003 02 14 05 50 00 6280-66 P n2o CCGG 315.680 0.260 ... H4 2003 12 11 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129711 SPO 2003 02 15 12 01 00 4117-91 S n2o CCGG 315.470 0.260 ... H4 2003 12 10 09 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129712 SPO 2003 02 15 12 01 00 4118-91 S n2o CCGG 315.670 0.260 ... H4 2003 12 10 09 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129713 SPO 2003 02 15 12 30 00 17-99 P n2o CCGG 236.520 -999.990 N.. H4 2003 12 10 09 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129714 SPO 2003 02 15 12 30 00 18-99 P n2o CCGG 313.470 0.260 N.. H4 2003 12 10 09 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129715 SPO 2003 02 21 07 45 00 6263-66 P n2o CCGG 316.160 0.260 ... H4 2003 12 11 11 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129716 SPO 2003 02 21 07 45 00 6264-66 P n2o CCGG 316.580 0.260 ... H4 2003 12 11 11 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129717 SPO 2003 03 01 02 50 00 6023-66 P n2o CCGG 316.380 0.260 ... H4 2003 12 10 10 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129718 SPO 2003 03 01 02 50 00 6024-66 P n2o CCGG 316.120 0.260 ... H4 2003 12 10 10 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129719 SPO 2003 03 01 02 55 00 149-98 S n2o CCGG 315.640 0.260 ... H4 2003 12 10 10 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129720 SPO 2003 03 01 02 55 00 150-98 S n2o CCGG 315.860 0.260 ... H4 2003 12 10 10 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129721 SPO 2003 03 07 13 20 00 6025-66 P n2o CCGG 315.610 0.260 ... H4 2003 12 16 09 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129722 SPO 2003 03 07 13 20 00 6026-66 P n2o CCGG 315.700 0.260 ..< H4 2003 12 16 09 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129723 SPO 2003 03 14 07 05 00 6091-66 P n2o CCGG 316.040 0.260 ..> H4 2003 12 16 10 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129724 SPO 2003 03 14 07 05 00 6092-66 P n2o CCGG 315.940 0.260 ... H4 2003 12 16 10 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129725 SPO 2003 03 17 12 00 00 6423-66 S n2o CCGG 316.180 0.260 ... H4 2003 12 15 18 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129726 SPO 2003 03 17 12 00 00 6424-66 S n2o CCGG 316.370 0.260 ... H4 2003 12 15 18 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129727 SPO 2003 03 17 12 25 00 6761-66 P n2o CCGG 315.970 0.260 ... H4 2003 12 16 09 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129728 SPO 2003 03 17 12 25 00 6762-66 P n2o CCGG 316.540 0.260 ... H4 2003 12 16 09 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129729 SPO 2003 03 22 13 27 00 6121-66 P n2o CCGG 316.080 0.260 ... H4 2003 12 15 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129730 SPO 2003 03 22 13 27 00 6122-66 P n2o CCGG 316.620 0.260 ... H4 2003 12 15 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129731 SPO 2003 03 28 13 22 00 6203-66 P n2o CCGG 316.580 0.260 ... H4 2003 12 15 12 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129732 SPO 2003 03 28 13 22 00 6204-66 P n2o CCGG 316.170 0.260 ... H4 2003 12 15 12 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129733 SPO 2003 04 01 09 58 00 6443-66 S n2o CCGG 316.280 0.260 ... H4 2003 12 15 11 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129734 SPO 2003 04 01 09 58 00 6444-66 S n2o CCGG 316.050 0.260 ... H4 2003 12 15 11 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129735 SPO 2003 04 01 10 18 00 6231-66 P n2o CCGG 316.150 0.260 ... H4 2003 12 15 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129736 SPO 2003 04 01 10 18 00 6232-66 P n2o CCGG 316.060 0.260 ... H4 2003 12 15 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129737 SPO 2003 04 04 08 38 00 561-99 P n2o CCGG 315.240 0.260 .X. H4 2003 12 15 14 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129738 SPO 2003 04 04 08 38 00 562-99 P n2o CCGG 310.380 0.260 N.. H4 2003 12 15 14 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129739 SPO 2003 04 11 09 02 00 1499-91 P n2o CCGG 316.410 0.260 ... H4 2003 12 10 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129740 SPO 2003 04 11 09 02 00 1500-91 P n2o CCGG 316.190 0.260 ... H4 2003 12 10 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129741 SPO 2003 04 16 10 00 00 379-91 S n2o CCGG 293.300 0.260 N.. H4 2003 12 15 13 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129742 SPO 2003 04 16 10 00 00 379-91 S n2o CCGG 315.490 0.260 N.. H4 2003 12 17 14 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129742 SPO 2003 04 16 10 00 00 380-91 S n2o CCGG 316.320 0.260 ... H4 2003 12 15 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129743 SPO 2003 04 16 10 00 00 380-91 S n2o CCGG 316.300 0.260 ... H4 2003 12 17 15 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129743 SPO 2003 04 16 10 00 00 4787-91 P n2o CCGG 315.990 0.260 ... H4 2003 12 15 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129744 SPO 2003 04 16 10 00 00 4788-91 P n2o CCGG 316.480 0.260 ... H4 2003 12 15 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129745 SPO 2003 04 25 06 06 00 1429-91 P n2o CCGG 316.050 0.260 ... H4 2003 12 15 13 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129746 SPO 2003 04 25 06 06 00 1429-91 P n2o CCGG 316.680 0.260 ... H4 2003 12 17 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129746 SPO 2003 04 25 06 06 00 1430-91 P n2o CCGG 301.320 0.260 N.. H4 2003 12 15 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129747 SPO 2003 04 25 06 06 00 1430-91 P n2o CCGG 317.830 0.260 N.. H4 2003 12 17 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129747 SPO 2003 05 01 04 52 00 1485-91 S n2o CCGG 316.390 0.260 ... H4 2003 12 10 15 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129748 SPO 2003 05 01 04 52 00 1485-91 S n2o CCGG 315.660 0.260 ... H4 2003 12 17 13 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129748 SPO 2003 05 01 04 52 00 1486-91 S n2o CCGG 303.210 0.260 N.. H4 2003 12 10 15 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129749 SPO 2003 05 01 04 52 00 1486-91 S n2o CCGG 318.350 0.260 N.. H4 2003 12 17 13 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129749 SPO 2003 05 01 06 46 00 1613-91 P n2o CCGG 315.750 0.260 ... H4 2003 12 10 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129750 SPO 2003 05 01 06 46 00 1614-91 P n2o CCGG 310.920 0.260 N.. H4 2003 12 10 14 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129751 SPO 2003 05 09 08 35 00 6825-66 P n2o CCGG 315.840 0.260 ... H4 2003 12 10 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129752 SPO 2003 05 09 08 35 00 6826-66 P n2o CCGG 316.140 0.260 ... H4 2003 12 10 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129753 SPO 2003 05 15 09 55 00 1521-91 S n2o CCGG 309.750 0.260 N.. H4 2003 12 17 16 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129756 SPO 2003 05 15 09 55 00 1522-91 S n2o CCGG 314.520 0.260 N.. H4 2003 12 17 16 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129757 SPO 2003 05 15 09 55 00 61-99 P n2o CCGG 316.360 0.260 ... H4 2003 12 17 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129754 SPO 2003 05 15 09 55 00 62-99 P n2o CCGG 316.260 0.260 ... H4 2003 12 17 15 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129755 SPO 2003 05 23 09 45 00 1519-91 P n2o CCGG 316.260 0.260 ... H4 2003 12 15 18 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129758 SPO 2003 05 23 09 45 00 1520-91 P n2o CCGG 315.970 0.260 ... H4 2003 12 15 18 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129759 SPO 2003 06 01 07 50 00 1739-91 S n2o CCGG 303.870 0.260 N.. H4 2003 12 15 17 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129760 SPO 2003 06 01 07 50 00 1740-91 S n2o CCGG 319.730 0.260 N.. H4 2003 12 15 17 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129761 SPO 2003 06 01 07 55 00 4653-91 P n2o CCGG 316.530 0.260 ... H4 2003 12 15 17 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129762 SPO 2003 06 01 07 55 00 4654-91 P n2o CCGG 316.490 0.260 ... H4 2003 12 15 17 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129763 SPO 2003 06 07 14 36 00 707-99 P n2o CCGG 316.510 0.260 ... H4 2003 12 15 16 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129764 SPO 2003 06 07 14 36 00 708-99 P n2o CCGG 317.470 0.260 ... H4 2003 12 15 16 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129765 SPO 2003 06 15 10 45 00 263-99 P n2o CCGG 318.880 0.260 N.. H4 2003 12 17 15 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129766 SPO 2003 06 15 10 45 00 264-99 P n2o CCGG 319.130 0.260 N.. H4 2003 12 17 16 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129767 SPO 2003 06 15 10 55 00 555-91 S n2o CCGG 303.690 0.260 N.. H4 2003 12 17 16 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129768 SPO 2003 06 15 10 55 00 556-91 S n2o CCGG 309.630 0.260 N.. H4 2003 12 17 16 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129769 SPO 2003 06 20 14 16 00 1269-91 P n2o CCGG 316.240 0.260 ... H4 2003 12 18 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129770 SPO 2003 06 20 14 16 00 1270-91 P n2o CCGG 314.710 0.260 N.. H4 2003 12 18 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129771 SPO 2003 06 27 06 32 00 4819-91 P n2o CCGG 317.000 0.260 ... H4 2003 12 18 11 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129772 SPO 2003 06 27 06 32 00 4820-91 P n2o CCGG 316.530 0.260 ... H4 2003 12 18 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129773 SPO 2003 07 02 03 50 00 6681-66 P n2o CCGG 316.430 0.260 ... H4 2003 12 15 16 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129774 SPO 2003 07 02 03 50 00 6682-66 P n2o CCGG 315.850 0.260 ... H4 2003 12 15 16 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129775 SPO 2003 07 02 03 55 00 1403-91 S n2o CCGG 316.530 0.260 ... H4 2003 12 15 15 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129776 SPO 2003 07 02 03 55 00 1404-91 S n2o CCGG 316.530 0.260 ... H4 2003 12 15 16 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129777 SPO 2003 07 11 09 35 00 6035-66 P n2o CCGG 316.960 0.260 ... H4 2003 12 18 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129778 SPO 2003 07 11 09 35 00 6036-66 P n2o CCGG 316.140 0.260 ... H4 2003 12 18 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129779 SPO 2003 07 18 03 56 00 6565-66 S n2o CCGG 316.660 0.260 ... H4 2003 12 15 15 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129780 SPO 2003 07 18 03 56 00 6566-66 S n2o CCGG 316.740 0.260 ... H4 2003 12 15 15 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129781 SPO 2003 07 18 04 10 00 6903-66 P n2o CCGG 316.220 0.260 ... H4 2003 12 15 14 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129782 SPO 2003 07 18 04 10 00 6904-66 P n2o CCGG 316.440 0.260 ... H4 2003 12 15 15 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129783 SPO 2003 07 26 12 55 00 2041-91 P n2o CCGG 316.260 0.260 ... H4 2003 12 10 10 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129784 SPO 2003 07 26 12 55 00 2042-91 P n2o CCGG 316.760 0.260 ... H4 2003 12 10 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129785 SPO 2003 08 01 05 45 00 6571-66 P n2o CCGG 316.840 0.260 ... H4 2003 12 10 12 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129786 SPO 2003 08 01 05 45 00 6572-66 P n2o CCGG 316.970 0.260 ... H4 2003 12 10 12 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129787 SPO 2003 08 01 05 48 00 6469-66 S n2o CCGG 317.110 0.260 ... H4 2003 12 12 15 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129788 SPO 2003 08 01 05 48 00 6470-66 S n2o CCGG 317.430 0.260 ... H4 2003 12 12 15 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129789 SPO 2003 08 08 09 00 00 6363-66 P n2o CCGG 316.450 0.260 ... H4 2003 12 12 13 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129790 SPO 2003 08 15 08 50 00 6375-66 P n2o CCGG 316.830 0.260 ... H4 2003 12 10 11 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129791 SPO 2003 08 15 08 50 00 6376-66 P n2o CCGG 316.630 0.260 ... H4 2003 12 10 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129792 SPO 2003 08 15 08 50 00 6509-66 S n2o CCGG 316.920 0.260 ... H4 2003 12 10 11 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129793 SPO 2003 08 15 08 50 00 6510-66 S n2o CCGG 316.640 0.260 ... H4 2003 12 10 11 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129794 SPO 2003 08 24 11 25 00 6197-66 P n2o CCGG 317.000 0.260 ... H4 2003 12 12 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129795 SPO 2003 08 24 11 25 00 6198-66 P n2o CCGG 317.180 0.260 ... H4 2003 12 12 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129796 SPO 2003 09 01 05 46 00 665-99 P n2o CCGG 316.710 0.260 ... H4 2003 12 12 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129797 SPO 2003 09 01 05 46 00 666-99 P n2o CCGG 316.500 0.260 ... H4 2003 12 12 14 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129798 SPO 2003 09 01 05 48 00 1853-91 S n2o CCGG 317.080 0.260 ... H4 2003 12 15 09 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129799 SPO 2003 09 01 05 48 00 1854-91 S n2o CCGG 317.290 0.260 ... H4 2003 12 15 09 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129800 SPO 2003 09 17 09 50 00 213-99 P n2o CCGG 317.220 0.260 ... H4 2003 12 10 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129801 SPO 2003 09 17 09 50 00 214-99 P n2o CCGG 317.800 0.260 ... H4 2003 12 10 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129802 SPO 2003 09 17 09 50 00 6247-66 S n2o CCGG 317.490 0.260 ... H4 2003 12 15 09 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129803 SPO 2003 09 17 09 50 00 6248-66 S n2o CCGG 317.450 0.260 ... H4 2003 12 15 09 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129804 SPO 2003 09 22 13 52 00 4089-91 P n2o CCGG 317.280 0.260 ... H4 2003 12 10 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129805 SPO 2003 09 22 13 52 00 4090-91 P n2o CCGG 316.650 0.260 ... H4 2003 12 10 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129806 SPO 2003 09 27 07 20 00 6735-66 P n2o CCGG 317.520 0.260 ... H4 2003 12 15 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129807 SPO 2003 09 27 07 20 00 6736-66 P n2o CCGG 317.050 0.260 ... H4 2003 12 15 10 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129808 SPO 2003 10 01 05 40 00 6139-66 P n2o CCGG 317.000 0.260 ... H4 2003 12 10 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129809 SPO 2003 10 01 05 40 00 6140-66 P n2o CCGG 316.850 0.260 ... H4 2003 12 10 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129810 SPO 2003 10 01 05 42 00 6413-66 S n2o CCGG 317.460 0.260 ... H4 2003 12 10 13 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129811 SPO 2003 10 01 05 42 00 6414-66 S n2o CCGG 317.160 0.260 ... H4 2003 12 10 13 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129812 SPO 2003 10 10 10 55 00 6393-66 P n2o CCGG 316.750 0.260 ... H4 2003 12 15 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129813 SPO 2003 10 10 10 55 00 6394-66 P n2o CCGG 317.070 0.260 ... H4 2003 12 15 10 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129814 SPO 2003 10 17 04 10 00 6595-66 P n2o CCGG 317.300 0.260 ... H4 2004 01 29 14 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129815 SPO 2003 10 17 04 10 00 6596-66 P n2o CCGG 316.960 0.260 ... H4 2004 01 29 15 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129816 SPO 2003 10 17 04 15 00 6085-66 S n2o CCGG 316.860 0.260 ... H4 2004 01 29 15 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129817 SPO 2003 10 17 04 15 00 6086-66 S n2o CCGG 317.600 0.260 ... H4 2004 01 29 16 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129818 SPO 2003 10 24 07 05 00 4211-91 P n2o CCGG 316.780 0.260 ... H4 2004 02 03 17 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129819 SPO 2003 10 24 07 05 00 4212-91 P n2o CCGG 316.790 0.260 ... H4 2004 02 03 17 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129820 SPO 2003 11 01 03 14 00 163-98 S n2o CCGG 317.260 0.260 ... H4 2004 02 03 16 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129821 SPO 2003 11 01 03 14 00 164-98 S n2o CCGG 317.010 0.260 ... H4 2004 02 03 16 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129822 SPO 2003 11 01 03 30 00 4843-98 P n2o CCGG 317.530 0.260 ... H4 2004 02 03 17 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129823 SPO 2003 11 01 03 30 00 4844-98 P n2o CCGG 317.220 0.260 ... H4 2004 02 03 17 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129824 SPO 2003 11 08 04 19 00 4911-91 P n2o CCGG 316.690 0.260 ... H4 2004 02 03 16 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129825 SPO 2003 11 08 04 19 00 4912-91 P n2o CCGG 316.960 0.260 ... H4 2004 02 03 16 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129826 SPO 2003 11 16 04 15 00 6493-66 S n2o CCGG 317.270 0.260 ... H4 2004 01 29 14 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129827 SPO 2003 11 16 04 15 00 6494-66 S n2o CCGG 318.830 0.260 A.. H4 2004 01 29 14 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129828 SPO 2003 11 16 04 21 00 6445-66 P n2o CCGG 317.680 0.260 ... H4 2004 01 29 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129829 SPO 2003 11 16 04 21 00 6446-66 P n2o CCGG 319.100 0.260 N.. H4 2004 01 29 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129830 SPO 2003 11 22 21 29 00 6537-66 P n2o CCGG 317.360 0.260 ... H4 2004 01 29 16 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129831 SPO 2003 11 22 21 29 00 6538-66 P n2o CCGG 317.410 0.260 ... H4 2004 01 29 16 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129832 SPO 2003 11 30 03 19 00 1165-91 P n2o CCGG 317.240 0.260 ... H4 2004 01 29 17 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129833 SPO 2003 11 30 03 19 00 1166-91 P n2o CCGG 317.390 0.260 ... H4 2004 01 29 17 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129834 SPO 2003 12 01 22 15 00 679-99 S n2o CCGG 317.610 0.260 ... H4 2004 02 02 11 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129835 SPO 2003 12 01 22 15 00 680-99 S n2o CCGG 316.780 0.260 ... H4 2004 02 02 12 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129836 SPO 2003 12 01 22 19 00 681-99 P n2o CCGG 317.380 0.260 ... H4 2004 02 02 14 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129837 SPO 2003 12 01 22 19 00 682-99 P n2o CCGG 317.030 0.260 ... H4 2004 02 02 14 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129838 SPO 2003 12 05 01 12 00 6663-66 P n2o CCGG 317.010 0.260 ... H4 2004 01 29 16 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129839 SPO 2003 12 05 01 12 00 6664-66 P n2o CCGG 316.840 0.260 ... H4 2004 01 29 16 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129840 SPO 2003 12 13 03 38 00 1683-91 P n2o CCGG 317.320 0.260 ... H4 2004 02 02 13 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129841 SPO 2003 12 13 03 38 00 1684-91 P n2o CCGG 316.950 0.260 ... H4 2004 02 02 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129842 SPO 2003 12 16 09 15 00 6501-66 S n2o CCGG 317.530 0.260 ... H4 2004 02 02 13 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129843 SPO 2003 12 16 09 15 00 6502-66 S n2o CCGG 317.370 0.260 ... H4 2004 02 02 13 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129844 SPO 2003 12 16 09 33 00 1929-99 P n2o CCGG 316.720 0.260 ... H4 2004 03 11 12 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129845 SPO 2003 12 16 09 33 00 1930-99 P n2o CCGG 316.980 0.260 ... H4 2004 03 11 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129846 SPO 2003 12 26 10 19 00 1941-99 P n2o CCGG 316.920 0.260 ... H4 2004 03 10 11 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129847 SPO 2003 12 26 10 19 00 1942-99 P n2o CCGG 317.450 0.260 ... H4 2004 03 10 11 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129848 SPO 2004 01 03 02 15 00 1903-99 S n2o CCGG 317.030 0.260 ... H4 2004 03 09 17 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129849 SPO 2004 01 03 02 15 00 1904-99 S n2o CCGG 317.550 0.260 ... H4 2004 03 09 17 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129850 SPO 2004 01 03 02 16 00 1925-99 P n2o CCGG 316.810 0.260 ... H4 2004 03 09 18 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129851 SPO 2004 01 03 02 16 00 1926-99 P n2o CCGG 316.800 0.260 ... H4 2004 03 09 18 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129852 SPO 2004 01 10 04 30 00 1931-99 P n2o CCGG 316.780 0.260 ... H4 2004 03 11 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129853 SPO 2004 01 10 04 30 00 1932-99 P n2o CCGG 317.120 0.260 ... H4 2004 03 11 12 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129854 SPO 2004 01 15 22 15 00 1923-99 P n2o CCGG 317.430 0.260 ... H4 2004 03 11 11 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129855 SPO 2004 01 15 22 15 00 1924-99 P n2o CCGG 317.650 0.260 ... H4 2004 03 11 11 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129856 SPO 2004 01 15 23 29 00 1927-99 S n2o CCGG 317.260 0.260 ... H4 2004 03 11 11 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129857 SPO 2004 01 15 23 29 00 1928-99 S n2o CCGG 317.610 0.260 ... H4 2004 03 11 11 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 129858 SPO 2004 01 31 02 52 00 1919-99 P n2o CCGG 317.420 0.260 ... H4 2004 03 09 17 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129859 SPO 2004 01 31 02 52 00 1920-99 P n2o CCGG 317.490 0.260 ... H4 2004 03 09 17 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 129860 SPO 2004 02 06 17 16 00 1631-99 P n2o CCGG 317.310 0.260 ... H4 2004 12 20 12 05 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193191 SPO 2004 02 06 17 16 00 1632-99 P n2o CCGG 316.750 0.260 ... H4 2004 12 20 12 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193192 SPO 2004 02 16 07 15 00 1571-99 S n2o CCGG 317.010 0.260 ... H4 2004 12 20 13 30 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193193 SPO 2004 02 16 07 15 00 1572-99 S n2o CCGG 317.240 0.260 ... H4 2004 12 20 13 44 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193194 SPO 2004 02 16 07 21 00 1601-99 P n2o CCGG 316.880 0.260 ... H4 2004 12 20 13 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193195 SPO 2004 02 16 07 21 00 1602-99 P n2o CCGG 316.730 0.260 ... H4 2004 12 20 13 16 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193196 SPO 2004 02 23 01 06 00 515-99 P n2o CCGG 316.680 0.260 ... H4 2004 12 20 12 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193197 SPO 2004 02 23 01 06 00 516-99 P n2o CCGG 316.480 0.260 ... H4 2004 12 20 12 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193198 SPO 2004 02 28 07 48 00 111-99 P n2o CCGG 316.500 0.260 ... H4 2004 12 17 11 15 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193036 SPO 2004 02 28 07 48 00 112-99 P n2o CCGG 316.460 0.260 ... H4 2004 12 17 11 29 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193037 SPO 2004 03 03 22 15 00 1963-99 S n2o CCGG 317.300 0.260 ... H4 2004 12 17 11 43 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193038 SPO 2004 03 03 22 15 00 1964-99 S n2o CCGG 317.400 0.260 ... H4 2004 12 17 11 57 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193039 SPO 2004 03 03 22 22 00 1969-99 P n2o CCGG 316.110 0.260 ... H4 2004 12 17 12 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193040 SPO 2004 03 03 22 22 00 1970-99 P n2o CCGG 316.520 0.260 ... H4 2004 12 17 12 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193041 SPO 2004 03 06 03 37 00 91-99 P n2o CCGG 316.980 0.260 ... H4 2004 12 17 12 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193042 SPO 2004 03 06 03 37 00 92-99 P n2o CCGG 316.920 0.260 ... H4 2004 12 17 12 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193043 SPO 2004 03 14 23 06 00 1243-99 P n2o CCGG 316.390 0.260 ... H4 2004 12 22 11 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193124 SPO 2004 03 14 23 06 00 1244-99 P n2o CCGG 317.520 0.260 ... H4 2004 12 22 12 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193125 SPO 2004 03 17 22 15 00 1947-99 S n2o CCGG 317.350 0.260 ... H4 2004 12 22 10 50 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193120 SPO 2004 03 17 22 15 00 1948-99 S n2o CCGG 316.850 0.260 ... H4 2004 12 22 11 04 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193121 SPO 2004 03 17 22 28 00 1953-99 P n2o CCGG 317.010 0.260 ... H4 2004 12 21 12 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193153 SPO 2004 03 17 22 28 00 1954-99 P n2o CCGG 317.190 0.260 ... H4 2004 12 21 12 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193154 SPO 2004 03 30 05 47 00 1949-99 P n2o CCGG 317.440 0.260 ... H4 2004 12 21 12 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193151 SPO 2004 03 30 05 47 00 1950-99 P n2o CCGG 316.660 0.260 ... H4 2004 12 21 12 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193152 SPO 2004 04 03 00 15 00 1653-99 S n2o CCGG 316.910 0.260 ... H4 2004 12 22 12 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193122 SPO 2004 04 03 00 15 00 1654-99 S n2o CCGG 316.440 0.260 ... H4 2004 12 22 12 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193123 SPO 2004 04 03 00 30 00 1951-99 P n2o CCGG 316.410 0.260 ... H4 2004 12 21 13 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193155 SPO 2004 04 03 00 30 00 1952-99 P n2o CCGG 316.810 0.260 ... H4 2004 12 21 13 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193156 SPO 2004 04 12 05 43 00 1657-99 P n2o CCGG 316.830 0.260 ... H4 2004 12 22 11 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193126 SPO 2004 04 12 05 43 00 1658-99 P n2o CCGG 316.210 0.260 ... H4 2004 12 22 11 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193127 SPO 2004 04 19 05 17 00 789-99 S n2o CCGG 317.110 0.260 ... H4 2005 01 04 11 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193048 SPO 2004 04 19 05 17 00 790-99 S n2o CCGG 317.260 0.260 ... H4 2005 01 04 11 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193049 SPO 2004 04 19 05 34 00 903-99 P n2o CCGG 316.910 0.260 ... H4 2005 01 04 10 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193044 SPO 2004 04 19 05 34 00 904-99 P n2o CCGG 317.100 0.260 ... H4 2005 01 04 10 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193045 SPO 2004 04 24 02 46 00 1157-99 P n2o CCGG 317.010 0.260 ... H4 2004 12 23 11 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193116 SPO 2004 04 24 02 46 00 1158-99 P n2o CCGG 316.970 0.260 ... H4 2004 12 23 11 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193117 SPO 2004 05 03 03 15 00 1943-99 S n2o CCGG 317.720 0.260 ... H4 2004 12 23 10 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193112 SPO 2004 05 03 03 15 00 1944-99 S n2o CCGG 316.800 0.260 ... H4 2004 12 23 10 23 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193113 SPO 2004 05 03 03 31 00 1945-99 P n2o CCGG 316.830 0.260 ... H4 2004 12 23 09 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193114 SPO 2004 05 03 03 31 00 1946-99 P n2o CCGG 316.700 0.260 ... H4 2004 12 23 09 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193115 SPO 2004 05 10 06 39 00 93-99 P n2o CCGG 316.470 0.260 ... H4 2004 12 23 10 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193118 SPO 2004 05 10 06 39 00 94-99 P n2o CCGG 316.310 0.260 ... H4 2004 12 23 10 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193119 SPO 2004 05 16 22 15 00 945-99 S n2o CCGG 316.860 0.260 ... H4 2005 01 04 09 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193046 SPO 2004 05 16 22 15 00 946-99 S n2o CCGG 317.240 0.260 ... H4 2005 01 04 09 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193047 SPO 2004 05 16 22 33 00 647-99 P n2o CCGG 316.740 0.260 ... H4 2005 01 04 11 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193050 SPO 2004 05 16 22 33 00 648-99 P n2o CCGG 316.770 0.260 ... H4 2005 01 04 11 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193051 SPO 2004 05 23 23 54 00 23-99 P n2o CCGG 317.330 0.260 ... H4 2004 12 29 14 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193142 SPO 2004 05 23 23 54 00 24-99 P n2o CCGG 317.580 0.260 ... H4 2004 12 29 14 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193143 SPO 2004 05 30 23 35 00 1971-99 P n2o CCGG 316.730 0.260 ... H4 2004 12 22 15 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193173 SPO 2004 05 30 23 35 00 1972-99 P n2o CCGG 316.520 0.260 ... H4 2004 12 22 15 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193174 SPO 2004 06 02 03 15 00 501-99 S n2o CCGG 316.860 0.260 ... H4 2004 12 29 15 03 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193136 SPO 2004 06 02 03 15 00 502-99 S n2o CCGG 317.190 0.260 ... H4 2004 12 29 15 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193137 SPO 2004 06 02 03 30 00 1961-99 P n2o CCGG 316.720 0.260 ... H4 2004 12 22 13 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193171 SPO 2004 06 02 03 30 00 1962-99 P n2o CCGG 317.340 0.260 ... H4 2004 12 22 13 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193172 SPO 2004 06 07 23 54 00 1959-99 P n2o CCGG 316.660 0.260 ... H4 2004 12 22 13 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193169 SPO 2004 06 07 23 54 00 1960-99 P n2o CCGG 316.300 0.260 ... H4 2004 12 22 13 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193170 SPO 2004 06 15 04 16 00 1965-99 S n2o CCGG 316.780 0.260 ... H4 2004 12 29 16 00 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193140 SPO 2004 06 15 04 16 00 1966-99 S n2o CCGG 316.160 0.260 ... H4 2004 12 29 16 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193141 SPO 2004 06 15 04 35 00 1957-99 P n2o CCGG 317.060 0.260 ... H4 2004 12 29 15 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193138 SPO 2004 06 15 04 35 00 1958-99 P n2o CCGG 317.190 0.260 ... H4 2004 12 29 15 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193139 SPO 2004 06 25 23 46 00 1967-99 P n2o CCGG 316.620 0.260 ... H4 2004 12 22 12 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193167 SPO 2004 06 25 23 46 00 1968-99 P n2o CCGG 316.520 0.260 ... H4 2004 12 22 12 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193168 SPO 2004 06 30 23 50 00 2045-99 P n2o CCGG 316.990 0.260 ... H4 2004 12 21 11 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193157 SPO 2004 06 30 23 50 00 2046-99 P n2o CCGG 316.540 0.260 ... H4 2004 12 21 11 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193158 SPO 2004 07 04 22 16 00 449-91 S n2o CCGG 316.980 0.260 ... H4 2004 12 20 14 28 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193177 SPO 2004 07 04 22 16 00 450-91 S n2o CCGG 317.690 0.260 ... H4 2004 12 20 14 42 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193178 SPO 2004 07 04 22 33 00 1847-99 P n2o CCGG 316.210 0.260 .X. H4 2004 12 20 09 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193219 SPO 2004 07 04 22 33 00 1848-99 P n2o CCGG 315.940 0.260 .X. H4 2004 12 20 09 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193220 SPO 2004 07 15 03 17 00 827-91 S n2o CCGG 317.430 0.260 ... H4 2004 12 20 14 00 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193179 SPO 2004 07 15 03 17 00 828-91 S n2o CCGG 316.810 0.260 ... H4 2004 12 20 14 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193180 SPO 2004 07 15 03 35 00 973-99 P n2o CCGG 316.980 0.260 ... H4 2004 12 20 14 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193181 SPO 2004 07 15 03 35 00 974-99 P n2o CCGG 316.390 0.260 ... H4 2004 12 20 15 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193182 SPO 2004 07 26 22 26 00 1408-99 P n2o CCGG 317.180 0.260 ... H4 2004 12 20 15 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193175 SPO 2004 07 26 22 26 00 824-99 P n2o CCGG 316.820 0.260 ... H4 2004 12 20 15 24 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193176 SPO 2004 08 03 09 15 00 1105-99 S n2o CCGG 316.780 0.260 ... H4 2004 12 17 13 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193008 SPO 2004 08 03 09 15 00 1106-99 S n2o CCGG 317.000 0.260 ... H4 2004 12 17 13 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193009 SPO 2004 08 03 09 40 00 4883-91 P n2o CCGG 317.810 0.260 ... H4 2004 12 17 13 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193010 SPO 2004 08 03 09 40 00 4884-91 P n2o CCGG 317.550 0.260 ... H4 2004 12 17 13 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193011 SPO 2004 08 08 23 50 00 2051-99 P n2o CCGG 316.990 0.260 ... H4 2004 12 17 14 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193012 SPO 2004 08 08 23 50 00 2052-99 P n2o CCGG 317.620 0.260 ... H4 2004 12 17 14 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193013 SPO 2004 08 16 03 15 00 595-99 S n2o CCGG 316.830 0.260 ... H4 2004 12 20 09 41 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193014 SPO 2004 08 16 03 15 00 596-99 S n2o CCGG 317.300 0.260 ... H4 2004 12 20 09 55 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193015 SPO 2004 08 16 03 33 00 1447-91 P n2o CCGG 317.710 0.260 ... H4 2004 12 17 10 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193034 SPO 2004 08 16 03 33 00 1448-91 P n2o CCGG 317.340 0.260 ... H4 2004 12 17 10 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193035 SPO 2004 08 25 03 57 00 607-91 P n2o CCGG 315.420 0.260 N.. H4 2004 12 17 10 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193032 SPO 2004 08 25 03 57 00 608-91 P n2o CCGG 317.860 0.260 ... H4 2004 12 17 11 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193033 SPO 2004 09 02 22 15 00 1137-99 S n2o CCGG 318.170 0.260 ... H4 2004 12 17 09 50 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193028 SPO 2004 09 02 22 15 00 1138-99 S n2o CCGG 317.720 0.260 ... H4 2004 12 17 10 04 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193029 SPO 2004 09 02 22 42 00 4889-91 P n2o CCGG 317.050 0.260 ... H4 2004 12 17 09 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193030 SPO 2004 09 02 22 42 00 4890-91 P n2o CCGG 316.510 0.260 ... H4 2004 12 17 09 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193031 SPO 2004 09 13 23 11 00 851-99 P n2o CCGG 317.420 0.260 ... H4 2004 12 21 14 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193163 SPO 2004 09 13 23 11 00 852-99 P n2o CCGG 317.540 0.260 ... H4 2004 12 21 14 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193164 SPO 2004 09 18 01 02 00 2001-99 P n2o CCGG 317.210 0.260 ... H4 2004 12 22 14 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193187 SPO 2004 09 18 01 02 00 2002-99 P n2o CCGG 317.660 0.260 ... H4 2004 12 22 14 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193188 SPO 2004 09 18 01 16 00 127-99 S n2o CCGG 317.100 0.260 ... H4 2004 12 21 13 35 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193159 SPO 2004 09 18 01 16 00 128-99 S n2o CCGG 317.270 0.260 ... H4 2004 12 21 13 49 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193160 SPO 2004 09 26 04 26 00 623-99 P n2o CCGG 317.460 0.260 ... H4 2004 12 22 15 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193183 SPO 2004 09 26 04 26 00 624-99 P n2o CCGG 317.650 0.260 ... H4 2004 12 22 15 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193184 SPO 2004 10 03 02 16 00 57-99 S n2o CCGG 317.390 0.260 ... H4 2004 12 22 14 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193185 SPO 2004 10 03 02 16 00 58-99 S n2o CCGG 317.500 0.260 ... H4 2004 12 22 14 28 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193186 SPO 2004 10 03 02 23 00 887-99 P n2o CCGG 317.080 0.260 ... H4 2004 12 23 09 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193189 SPO 2004 10 03 02 23 00 888-99 P n2o CCGG 316.990 0.260 ... H4 2004 12 23 09 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193190 SPO 2004 10 11 08 26 00 1997-99 P n2o CCGG 317.510 0.260 ... H4 2004 12 21 14 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193161 SPO 2004 10 11 08 26 00 1998-99 P n2o CCGG 317.640 0.260 ... H4 2004 12 21 14 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193162 SPO 2004 10 17 23 17 00 2005-99 S n2o CCGG 316.830 0.260 ... H4 2004 12 21 15 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193165 SPO 2004 10 17 23 17 00 2006-99 S n2o CCGG 317.780 0.260 ... H4 2004 12 21 15 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193166 SPO 2004 10 17 23 26 00 247-99 P n2o CCGG 317.420 0.260 ... H4 2004 12 16 15 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192994 SPO 2004 10 17 23 26 00 248-99 P n2o CCGG 317.690 0.260 ... H4 2004 12 16 15 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192995 SPO 2004 10 26 09 34 00 619-99 P n2o CCGG 317.790 0.260 ... H4 2004 12 17 08 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192998 SPO 2004 10 26 09 34 00 620-99 P n2o CCGG 317.390 0.260 ... H4 2004 12 17 09 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192999 SPO 2004 11 02 09 16 00 1669-99 P n2o CCGG 317.870 0.260 ... H4 2004 12 20 10 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193006 SPO 2004 11 02 09 16 00 1670-99 P n2o CCGG 318.640 0.260 ... H4 2004 12 20 10 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193007 SPO 2004 11 02 09 23 00 273-99 S n2o CCGG 318.530 0.260 ... H4 2004 12 20 11 37 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193002 SPO 2004 11 02 09 23 00 274-99 S n2o CCGG 317.820 0.260 ... H4 2004 12 20 11 51 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193003 SPO 2004 11 06 07 37 00 1671-99 P n2o CCGG 317.360 0.260 ... H4 2004 12 16 15 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192992 SPO 2004 11 06 07 37 00 1672-99 P n2o CCGG 317.730 0.260 ... H4 2004 12 16 15 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192993 SPO 2004 11 11 05 32 00 1391-99 P n2o CCGG 317.700 0.260 ... H4 2004 12 16 16 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192996 SPO 2004 11 11 05 32 00 1392-99 P n2o CCGG 317.300 0.260 ... H4 2004 12 16 16 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 192997 SPO 2004 11 15 03 14 00 787-99 P n2o CCGG 317.760 0.260 ... H4 2004 12 20 11 09 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193004 SPO 2004 11 15 03 14 00 788-99 P n2o CCGG 316.010 0.260 A.. H4 2004 12 20 11 23 00 -89.9600 -24.8000 2815.00 2810.00 5.00 193005 SPO 2004 11 15 03 18 00 1213-99 S n2o CCGG 317.330 0.260 ... H4 2004 12 20 10 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193000 SPO 2004 11 15 03 18 00 1214-99 S n2o CCGG 318.030 0.260 ... H4 2004 12 20 10 23 00 -89.9600 -24.8000 2821.30 2810.00 11.30 193001 SPO 2004 11 20 04 42 00 1415-99 P n2o CCGG 318.380 0.260 ... H4 2005 02 25 15 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195580 SPO 2004 11 20 04 42 00 1416-99 P n2o CCGG 317.810 0.260 ... H4 2005 02 25 15 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195581 SPO 2004 11 26 06 01 00 1921-99 P n2o CCGG 317.480 0.260 ... H4 2005 02 25 14 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195575 SPO 2004 11 26 06 01 00 1922-99 P n2o CCGG 318.260 0.260 ... H4 2005 02 25 14 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195576 SPO 2004 12 01 21 43 00 1899-99 P n2o CCGG 317.380 0.260 ... H4 2005 02 25 10 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195582 SPO 2004 12 01 21 43 00 1900-99 P n2o CCGG 317.740 0.260 ... H4 2005 02 25 11 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195583 SPO 2004 12 01 21 51 00 1897-99 S n2o CCGG 317.550 0.260 ... H4 2005 02 25 12 22 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195598 SPO 2004 12 01 21 51 00 1898-99 S n2o CCGG 318.290 0.260 ... H4 2005 02 25 12 36 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195599 SPO 2004 12 10 15 21 00 828-99 P n2o CCGG 317.890 0.260 ... H4 2005 03 01 09 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195579 SPO 2004 12 17 01 06 00 1495-99 P n2o CCGG 317.840 0.260 ... H4 2005 02 25 11 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195600 SPO 2004 12 17 01 06 00 1496-99 P n2o CCGG 317.340 0.260 ... H4 2005 02 25 12 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195601 SPO 2004 12 17 01 17 00 1901-99 S n2o CCGG 318.360 0.260 ... H4 2005 02 25 15 11 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195577 SPO 2004 12 17 01 17 00 1902-99 S n2o CCGG 317.760 0.260 ... H4 2005 02 25 15 25 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195578 SPO 2004 12 26 23 03 00 857-99 P n2o CCGG 317.590 0.260 ... H4 2005 02 25 11 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195584 SPO 2004 12 26 23 03 00 858-99 P n2o CCGG 318.090 0.260 ... H4 2005 02 25 11 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195585 SPO 2005 01 03 23 52 00 315-99 P n2o CCGG 317.810 0.260 ... H4 2005 02 25 13 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195557 SPO 2005 01 03 23 52 00 316-99 P n2o CCGG 317.440 0.260 ... H4 2005 02 25 13 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195558 SPO 2005 01 04 02 30 00 2137-99 S n2o CCGG 317.670 0.260 ... H4 2005 02 25 13 47 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195561 SPO 2005 01 04 02 30 00 2138-99 S n2o CCGG 317.610 0.260 ... H4 2005 02 25 14 01 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195602 SPO 2005 01 07 02 44 00 2607-99 P n2o CCGG 318.140 0.260 ... H4 2005 02 28 09 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195553 SPO 2005 01 07 02 44 00 2608-99 P n2o CCGG 317.870 0.260 ... H4 2005 02 28 09 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195554 SPO 2005 01 15 01 14 00 2689-99 P n2o CCGG 317.430 0.260 ... H4 2005 02 25 16 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195525 SPO 2005 01 15 01 14 00 2690-99 P n2o CCGG 317.390 0.260 ... H4 2005 02 25 16 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195526 SPO 2005 01 15 01 19 00 189-99 S n2o CCGG 317.290 0.260 ... H4 2005 02 25 14 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195562 SPO 2005 01 15 01 19 00 190-99 S n2o CCGG 317.640 0.260 ... H4 2005 02 25 14 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195563 SPO 2005 01 21 11 00 00 1207-99 P n2o CCGG 318.110 0.260 ... H4 2005 02 25 12 50 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195559 SPO 2005 01 21 11 00 00 1208-99 P n2o CCGG 317.400 0.260 ... H4 2005 02 25 13 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195560 SPO 2005 01 28 06 25 00 3479-99 P n2o CCGG 317.350 0.260 ... H4 2005 12 14 11 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210216 SPO 2005 01 28 06 25 00 3480-99 P n2o CCGG 316.940 0.260 ... H4 2005 12 14 12 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210217 SPO 2005 02 01 10 14 00 2581-99 S n2o CCGG 317.190 0.260 ... H4 2005 02 28 10 08 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195555 SPO 2005 02 01 10 14 00 2582-99 S n2o CCGG 317.640 0.260 ... H4 2005 02 28 10 22 00 -89.9600 -24.8000 2821.30 2810.00 11.30 195556 SPO 2005 02 01 10 30 00 1875-99 P n2o CCGG 317.750 0.260 ... H4 2005 02 28 09 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195551 SPO 2005 02 01 10 30 00 1876-99 P n2o CCGG 317.190 0.260 ... H4 2005 02 28 09 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 195552 SPO 2005 02 11 03 41 00 1339-99 P n2o CCGG 317.200 0.260 ... H4 2005 12 14 11 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210218 SPO 2005 02 11 03 41 00 1340-99 P n2o CCGG 316.890 0.260 ... H4 2005 12 14 11 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210219 SPO 2005 02 15 22 15 00 3723-99 P n2o CCGG 317.640 0.260 ... H4 2005 12 14 09 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210220 SPO 2005 02 15 22 15 00 3724-99 P n2o CCGG 317.560 0.260 ... H4 2005 12 14 09 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210221 SPO 2005 02 15 22 19 00 2165-99 S n2o CCGG 317.780 0.260 ... H4 2005 12 14 10 51 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210214 SPO 2005 02 15 22 19 00 2166-99 S n2o CCGG 317.000 0.260 ... H4 2005 12 14 11 05 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210215 SPO 2005 02 17 22 31 00 135-99 P n2o CCGG 316.490 0.260 .X. H4 2005 12 14 17 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210226 SPO 2005 02 17 22 31 00 136-99 P n2o CCGG 316.360 0.260 .X. H4 2005 12 14 17 15 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210227 SPO 2005 02 24 21 31 00 2795-99 P n2o CCGG 317.510 0.260 ... H4 2005 12 14 16 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210224 SPO 2005 02 24 21 31 00 2796-99 P n2o CCGG 316.390 0.260 ... H4 2005 12 14 16 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210225 SPO 2005 03 01 02 14 00 1753-99 P n2o CCGG 317.460 0.260 ... H4 2005 12 14 15 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210228 SPO 2005 03 01 02 14 00 1754-99 P n2o CCGG 317.690 0.260 ... H4 2005 12 14 15 50 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210229 SPO 2005 03 01 02 19 00 2419-99 S n2o CCGG 317.970 0.260 ... H4 2005 12 14 16 04 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210222 SPO 2005 03 01 02 19 00 2420-99 S n2o CCGG 317.630 0.260 ... H4 2005 12 14 16 18 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210223 SPO 2005 03 04 01 43 00 3084-99 P n2o CCGG 316.890 0.260 ... H4 2005 12 19 13 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210139 SPO 2005 03 11 02 20 00 2977-99 P n2o CCGG 316.770 0.260 ... H4 2005 12 14 13 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210142 SPO 2005 03 11 02 20 00 2978-99 P n2o CCGG 316.970 0.260 ... H4 2005 12 14 13 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210143 SPO 2005 03 15 03 10 00 6045-66 P n2o CCGG 316.980 0.260 ... H4 2005 12 14 12 16 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210140 SPO 2005 03 15 03 10 00 6046-66 P n2o CCGG 316.670 0.260 ... H4 2005 12 14 12 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210141 SPO 2005 03 15 03 16 00 3293-99 S n2o CCGG 317.360 0.260 ... H4 2005 12 14 12 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210137 SPO 2005 03 15 03 16 00 3294-99 S n2o CCGG 317.570 0.260 ... H4 2005 12 14 12 59 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210138 SPO 2005 03 18 03 10 00 6407-66 P n2o CCGG 316.610 0.260 ... H4 2005 12 12 17 24 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210135 SPO 2005 03 18 03 10 00 6408-66 P n2o CCGG 316.550 0.260 ... H4 2005 12 12 17 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210136 SPO 2005 03 25 03 36 00 1577-99 P n2o CCGG 316.680 0.260 ... H4 2005 12 12 16 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210133 SPO 2005 03 25 03 36 00 1578-99 P n2o CCGG 316.750 0.260 ... H4 2005 12 12 17 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210134 SPO 2005 04 01 07 13 00 2695-99 P n2o CCGG 316.760 0.260 ... H4 2005 12 12 16 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210131 SPO 2005 04 01 07 13 00 2696-99 P n2o CCGG 316.370 0.260 ... H4 2005 12 12 16 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210132 SPO 2005 04 01 07 18 00 3543-99 S n2o CCGG 317.350 0.260 ... H4 2005 12 12 15 59 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210129 SPO 2005 04 01 07 18 00 3544-99 S n2o CCGG 317.590 0.260 ... H4 2005 12 12 16 13 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210130 SPO 2005 04 08 02 21 00 6559-66 P n2o CCGG 317.220 0.260 ... H4 2005 12 16 12 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210166 SPO 2005 04 08 02 21 00 6560-66 P n2o CCGG 317.700 0.260 ... H4 2005 12 16 12 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210167 SPO 2005 04 15 22 09 00 6193-66 P n2o CCGG 316.220 0.260 ... H4 2005 12 16 11 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210164 SPO 2005 04 15 22 09 00 6194-66 P n2o CCGG 317.170 0.260 ... H4 2005 12 16 11 51 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210165 SPO 2005 04 15 22 16 00 3179-99 S n2o CCGG 317.390 0.260 ... H4 2005 12 16 12 05 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210160 SPO 2005 04 15 22 16 00 3180-99 S n2o CCGG 316.990 0.260 ... H4 2005 12 16 12 19 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210161 SPO 2005 04 23 03 42 00 2589-99 P n2o CCGG 317.660 0.260 ... H4 2005 12 16 11 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210162 SPO 2005 04 23 03 42 00 2590-99 P n2o CCGG 316.860 0.260 ... H4 2005 12 16 11 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210163 SPO 2005 04 29 05 17 00 2411-99 P n2o CCGG 316.800 0.260 ... H4 2005 12 13 12 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210184 SPO 2005 04 29 05 17 00 2412-99 P n2o CCGG 316.530 0.260 ... H4 2005 12 13 12 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210185 SPO 2005 05 02 03 12 00 3135-99 P n2o CCGG 317.060 0.260 ... H4 2005 12 13 11 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210186 SPO 2005 05 02 03 12 00 3136-99 P n2o CCGG 316.740 0.260 ... H4 2005 12 13 11 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210187 SPO 2005 05 02 03 17 00 3533-99 S n2o CCGG 317.220 0.260 ... H4 2005 12 13 11 35 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210182 SPO 2005 05 02 03 17 00 3534-99 S n2o CCGG 317.100 0.260 ... H4 2005 12 13 11 50 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210183 SPO 2005 05 06 02 20 00 3553-99 P n2o CCGG 317.390 0.260 ... H4 2005 12 13 10 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210188 SPO 2005 05 06 02 20 00 3554-99 P n2o CCGG 317.620 0.260 ... H4 2005 12 13 10 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210189 SPO 2005 05 13 23 59 00 3037-99 P n2o CCGG 316.120 0.260 ... H4 2005 12 14 15 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210111 SPO 2005 05 13 23 59 00 3038-99 P n2o CCGG 317.180 0.260 ... H4 2005 12 14 15 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210112 SPO 2005 05 16 04 00 00 3301-99 S n2o CCGG 317.170 0.260 ... H4 2005 12 14 14 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210107 SPO 2005 05 16 04 00 00 3302-99 S n2o CCGG 317.090 0.260 ... H4 2005 12 14 14 25 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210108 SPO 2005 05 16 04 10 00 3013-99 P n2o CCGG 317.630 0.260 ... H4 2005 12 14 14 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210109 SPO 2005 05 16 04 10 00 3014-99 P n2o CCGG 316.530 0.260 ... H4 2005 12 14 14 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210110 SPO 2005 05 20 03 33 00 6195-66 P n2o CCGG 317.550 0.260 ... H4 2005 12 14 13 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210105 SPO 2005 05 20 03 33 00 6196-66 P n2o CCGG 317.630 0.260 ... H4 2005 12 14 13 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210106 SPO 2005 05 27 04 24 00 6047-66 P n2o CCGG 316.400 0.260 ... H4 2005 12 15 13 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210119 SPO 2005 05 27 04 24 00 6048-66 P n2o CCGG 317.360 0.260 ... H4 2005 12 15 13 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210120 SPO 2005 06 01 02 16 00 531-99 P n2o CCGG 318.140 0.260 ... H4 2005 12 15 12 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210117 SPO 2005 06 01 02 16 00 532-99 P n2o CCGG 317.040 0.260 ... H4 2005 12 15 12 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210118 SPO 2005 06 01 02 19 00 1299-99 S n2o CCGG 317.320 0.260 ... H4 2005 12 15 12 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210115 SPO 2005 06 01 02 19 00 1300-99 S n2o CCGG 317.540 0.260 ... H4 2005 12 15 12 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210116 SPO 2005 06 03 03 48 00 1151-99 P n2o CCGG 317.490 0.260 ... H4 2005 12 15 11 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210113 SPO 2005 06 03 03 48 00 1152-99 P n2o CCGG 316.370 0.260 ... H4 2005 12 15 11 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210114 SPO 2005 06 10 23 12 00 17-99 P n2o CCGG 317.460 0.260 ... H4 2005 12 12 11 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210204 SPO 2005 06 10 23 12 00 18-99 P n2o CCGG 317.010 0.260 ... H4 2005 12 12 11 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210205 SPO 2005 06 15 22 13 00 3971-99 P n2o CCGG 317.400 0.260 ... H4 2005 12 12 10 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210202 SPO 2005 06 15 22 13 00 3972-99 P n2o CCGG 316.540 0.260 ... H4 2005 12 12 10 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210203 SPO 2005 06 15 22 17 00 245-99 S n2o CCGG 317.400 0.260 ... H4 2005 12 12 11 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210198 SPO 2005 06 15 22 17 00 246-99 S n2o CCGG 317.520 0.260 ... H4 2005 12 12 11 28 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210199 SPO 2005 06 18 03 30 00 3973-99 P n2o CCGG 318.720 0.260 ... H4 2005 12 12 09 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210200 SPO 2005 06 18 03 30 00 3974-99 P n2o CCGG 316.970 0.260 ... H4 2005 12 12 09 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210201 SPO 2005 06 26 02 40 00 3427-99 P n2o CCGG 317.660 0.260 ... H4 2005 12 12 15 30 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210212 SPO 2005 06 26 02 40 00 3428-99 P n2o CCGG 318.320 0.260 ... H4 2005 12 12 15 44 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210213 SPO 2005 06 30 22 11 00 6681-66 P n2o CCGG 318.290 0.260 ... H4 2005 12 12 14 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210208 SPO 2005 06 30 22 11 00 6682-66 P n2o CCGG 317.540 0.260 ... H4 2005 12 12 14 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210209 SPO 2005 06 30 22 17 00 2713-99 S n2o CCGG 317.040 0.260 ... H4 2005 12 12 15 02 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210210 SPO 2005 06 30 22 17 00 2714-99 S n2o CCGG 317.330 0.260 ... H4 2005 12 12 15 16 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210211 SPO 2005 07 05 00 29 00 3299-99 P n2o CCGG 317.330 0.260 ... H4 2005 12 13 14 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210154 SPO 2005 07 05 00 29 00 3300-99 P n2o CCGG 316.960 0.260 ... H4 2005 12 13 15 09 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210155 SPO 2005 07 10 02 28 00 3981-99 P n2o CCGG 318.170 0.260 ... H4 2005 12 12 14 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210206 SPO 2005 07 10 02 28 00 3982-99 P n2o CCGG 317.150 0.260 ... H4 2005 12 12 14 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210207 SPO 2005 07 15 02 10 00 3141-99 P n2o CCGG 317.230 0.260 ... H4 2005 12 16 13 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210180 SPO 2005 07 15 02 10 00 3142-99 P n2o CCGG 317.980 0.260 ... H4 2005 12 16 14 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210181 SPO 2005 07 15 02 15 00 6249-66 S n2o CCGG 318.060 0.260 ... H4 2005 12 16 13 30 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210176 SPO 2005 07 15 02 15 00 6250-66 S n2o CCGG 317.660 0.260 ... H4 2005 12 16 13 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210177 SPO 2005 07 22 08 16 00 6313-66 P n2o CCGG 317.150 0.260 ... H4 2005 12 16 13 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210178 SPO 2005 07 22 08 16 00 6314-66 P n2o CCGG 317.440 0.260 ... H4 2005 12 16 13 16 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210179 SPO 2005 07 29 04 13 00 1273-99 P n2o CCGG 317.860 0.260 ... H4 2005 12 13 16 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210158 SPO 2005 07 29 04 13 00 1274-99 P n2o CCGG 318.040 0.260 ... H4 2005 12 13 16 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210159 SPO 2005 08 02 21 11 00 1035-99 P n2o CCGG 318.430 0.260 ... H4 2005 12 13 15 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210156 SPO 2005 08 02 21 11 00 1036-99 P n2o CCGG 318.210 0.260 ... H4 2005 12 13 16 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210157 SPO 2005 08 02 21 16 00 2015-99 S n2o CCGG 317.890 0.260 ... H4 2005 12 13 15 23 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210152 SPO 2005 08 02 21 16 00 2016-99 S n2o CCGG 318.480 0.260 ... H4 2005 12 13 15 37 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210153 SPO 2005 08 12 03 23 00 2829-99 P n2o CCGG 317.480 0.260 ... H4 2005 12 16 10 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210174 SPO 2005 08 12 03 23 00 2830-99 P n2o CCGG 317.650 0.260 ... H4 2005 12 16 10 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210175 SPO 2005 08 15 22 10 00 2359-99 P n2o CCGG 317.090 0.260 ... H4 2005 12 16 14 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210194 SPO 2005 08 15 22 10 00 2360-99 P n2o CCGG 318.320 0.260 ... H4 2005 12 16 15 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210195 SPO 2005 08 15 22 16 00 3053-99 S n2o CCGG 318.370 0.260 ... H4 2005 12 16 09 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210168 SPO 2005 08 15 22 16 00 3054-99 S n2o CCGG 317.100 0.260 ... H4 2005 12 16 09 28 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210169 SPO 2005 08 26 03 18 00 3177-99 P n2o CCGG 318.340 0.260 ... H4 2005 12 16 14 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210196 SPO 2005 08 26 03 18 00 3178-99 P n2o CCGG 317.370 0.260 ... H4 2005 12 16 14 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210197 SPO 2005 09 01 03 11 00 3213-99 P n2o CCGG 317.250 0.260 .X. H4 2005 12 16 09 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210172 SPO 2005 09 01 03 11 00 3214-99 P n2o CCGG 316.980 0.260 .X. H4 2005 12 16 09 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210173 SPO 2005 09 01 03 15 00 3045-99 S n2o CCGG 318.390 0.260 ... H4 2005 12 16 10 40 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210170 SPO 2005 09 01 03 15 00 3046-99 S n2o CCGG 317.860 0.260 ... H4 2005 12 16 10 54 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210171 SPO 2005 09 09 23 33 00 2295-99 P n2o CCGG 317.360 0.260 ... H4 2005 12 19 09 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210192 SPO 2005 09 09 23 33 00 2296-99 P n2o CCGG 317.620 0.260 ... H4 2005 12 19 10 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210193 SPO 2005 09 15 02 11 00 3315-99 P n2o CCGG 319.050 0.260 ... H4 2005 12 15 13 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210146 SPO 2005 09 15 02 11 00 3316-99 P n2o CCGG 318.330 0.260 ... H4 2005 12 15 13 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210147 SPO 2005 09 15 02 16 00 755-99 S n2o CCGG 318.150 0.260 ... H4 2005 12 16 15 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210190 SPO 2005 09 15 02 16 00 756-99 S n2o CCGG 318.310 0.260 ... H4 2005 12 16 15 38 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210191 SPO 2005 09 23 02 50 00 1789-99 P n2o CCGG 318.970 0.260 ... H4 2005 12 15 14 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210148 SPO 2005 09 23 02 50 00 1790-99 P n2o CCGG 318.450 0.260 ... H4 2005 12 15 14 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210149 SPO 2005 10 02 21 11 00 81-99 P n2o CCGG 318.060 0.260 ... H4 2005 12 15 14 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210150 SPO 2005 10 02 21 11 00 82-99 P n2o CCGG 317.830 0.260 ... H4 2005 12 15 14 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210151 SPO 2005 10 02 21 16 00 2919-99 S n2o CCGG 318.500 0.260 ... H4 2005 12 15 15 01 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210144 SPO 2005 10 02 21 16 00 2920-99 S n2o CCGG 318.310 0.260 ... H4 2005 12 15 15 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210145 SPO 2005 10 07 02 46 00 2063-99 P n2o CCGG 316.730 0.260 N.. H4 2005 12 13 12 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210123 SPO 2005 10 07 02 46 00 2064-99 P n2o CCGG 303.030 0.260 N.. H4 2005 12 13 12 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210124 SPO 2005 10 19 01 11 00 2697-99 P n2o CCGG 318.300 0.260 ... H4 2005 12 13 13 29 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210125 SPO 2005 10 19 01 11 00 2698-99 P n2o CCGG 318.570 0.260 ... H4 2005 12 13 13 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210126 SPO 2005 10 19 01 16 00 2029-99 S n2o CCGG 317.330 0.260 ... H4 2005 12 13 13 01 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210121 SPO 2005 10 19 01 16 00 2030-99 S n2o CCGG 318.730 0.260 ... H4 2005 12 13 13 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 210122 SPO 2005 10 22 03 24 00 1171-99 P n2o CCGG 317.930 0.260 ... H4 2005 12 13 13 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210127 SPO 2005 10 22 03 24 00 1172-99 P n2o CCGG 318.040 0.260 ... H4 2005 12 13 14 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 210128 SPO 2005 10 28 02 25 00 2773-99 P n2o CCGG 318.170 0.260 ... H4 2006 01 18 13 44 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211337 SPO 2005 10 28 02 25 00 2774-99 P n2o CCGG 318.270 0.260 ... H4 2006 01 18 13 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211338 SPO 2005 11 01 21 15 00 2523-99 P n2o CCGG 318.250 0.260 ... H4 2006 01 18 11 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211263 SPO 2005 11 01 21 15 00 2524-99 P n2o CCGG 317.610 0.260 ... H4 2006 01 18 11 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211264 SPO 2005 11 01 21 18 00 3433-99 S n2o CCGG 318.430 0.260 ... H4 2006 01 18 13 16 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211333 SPO 2005 11 01 21 18 00 3434-99 S n2o CCGG 318.510 0.260 ... H4 2006 01 18 13 30 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211334 SPO 2005 11 06 03 50 00 1625-99 P n2o CCGG 318.000 0.260 ... H4 2006 01 18 11 50 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211265 SPO 2005 11 06 03 50 00 1626-99 P n2o CCGG 318.620 0.260 ... H4 2006 01 18 12 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211266 SPO 2005 11 11 04 48 00 2003-99 P n2o CCGG 318.830 0.260 ... H4 2006 01 18 14 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211339 SPO 2005 11 11 04 48 00 2004-99 P n2o CCGG 317.960 0.260 ... H4 2006 01 18 14 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211340 SPO 2005 11 15 01 10 00 3735-99 P n2o CCGG 318.280 0.260 ... H4 2006 01 09 16 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211341 SPO 2005 11 15 01 10 00 3736-99 P n2o CCGG 319.000 0.260 ... H4 2006 01 09 17 14 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211342 SPO 2005 11 15 01 15 00 1883-99 S n2o CCGG 319.130 0.260 ... H4 2006 01 18 14 41 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211335 SPO 2005 11 15 01 15 00 1884-99 S n2o CCGG 318.970 0.260 ... H4 2006 01 18 14 55 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211336 SPO 2005 11 21 20 10 00 719-99 P n2o CCGG 318.650 0.260 ... H4 2006 01 10 10 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211343 SPO 2005 11 21 20 10 00 720-99 P n2o CCGG 319.080 0.260 ... H4 2006 01 10 10 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211344 SPO 2005 11 27 03 06 00 4215-99 P n2o CCGG 318.730 0.260 ... H4 2006 01 26 15 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211678 SPO 2005 11 27 03 06 00 4216-99 P n2o CCGG 318.230 0.260 ... H4 2006 01 26 16 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211679 SPO 2005 12 01 00 14 00 4227-99 S n2o CCGG 318.520 0.260 ... H4 2006 01 26 15 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211676 SPO 2005 12 01 00 14 00 4228-99 S n2o CCGG 319.130 0.260 ... H4 2006 01 26 15 43 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211677 SPO 2005 12 01 01 09 00 83-99 P n2o CCGG 318.610 0.260 ... H4 2006 01 27 10 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211666 SPO 2005 12 01 01 09 00 84-99 P n2o CCGG 317.760 0.260 ... H4 2006 01 27 11 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211667 SPO 2005 12 04 06 21 00 2941-99 P n2o CCGG 317.990 0.260 ... H4 2006 01 27 11 23 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211668 SPO 2005 12 04 06 21 00 2942-99 P n2o CCGG 318.900 0.260 ... H4 2006 01 27 11 37 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211669 SPO 2005 12 08 18 38 00 4217-99 P n2o CCGG 318.390 0.260 ... H4 2006 01 26 16 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211680 SPO 2005 12 08 18 38 00 4218-99 P n2o CCGG 318.290 0.260 ... H4 2006 01 26 16 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211681 SPO 2005 12 16 04 08 00 4269-99 P n2o CCGG 318.840 0.260 ... H4 2006 01 27 11 51 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211670 SPO 2005 12 16 04 08 00 4270-99 P n2o CCGG 318.640 0.260 ... H4 2006 01 27 12 05 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211671 SPO 2005 12 16 04 16 00 2363-99 S n2o CCGG 318.510 0.260 ... H4 2006 01 26 16 54 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211674 SPO 2005 12 16 04 16 00 2364-99 S n2o CCGG 318.160 0.260 ... H4 2006 01 26 17 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 211675 SPO 2005 12 22 04 28 00 4253-99 P n2o CCGG 318.810 0.260 ... H4 2006 01 27 12 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211672 SPO 2005 12 22 04 28 00 4254-99 P n2o CCGG 318.570 0.260 ... H4 2006 01 27 12 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 211673 SPO 2005 12 28 03 02 00 4099-99 P n2o CCGG 318.490 0.260 ... H4 2006 02 27 10 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213085 SPO 2005 12 28 03 02 00 4100-99 P n2o CCGG 318.580 0.260 ... H4 2006 02 27 10 25 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213086 SPO 2006 01 02 09 10 00 4265-99 P n2o CCGG 318.220 0.260 ... H4 2006 02 27 09 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213083 SPO 2006 01 02 09 10 00 4266-99 P n2o CCGG 319.330 0.260 ... H4 2006 02 27 09 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213084 SPO 2006 01 02 09 16 00 4291-99 S n2o CCGG 318.390 0.260 ... H4 2006 02 24 10 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213081 SPO 2006 01 02 09 16 00 4292-99 S n2o CCGG 318.600 0.260 ... H4 2006 02 24 10 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213082 SPO 2006 01 08 07 47 00 4293-99 P n2o CCGG 318.200 0.260 ... H4 2006 02 24 09 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213075 SPO 2006 01 08 07 47 00 4294-99 P n2o CCGG 317.840 0.260 ... H4 2006 02 24 10 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213076 SPO 2006 01 15 01 10 00 4299-99 P n2o CCGG 318.270 0.260 ... H4 2006 02 27 09 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213087 SPO 2006 01 15 01 10 00 4300-99 P n2o CCGG 318.440 0.260 ... H4 2006 02 27 09 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213088 SPO 2006 01 15 01 14 00 1673-99 S n2o CCGG 319.680 0.260 ... H4 2006 02 27 10 39 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213089 SPO 2006 01 15 01 14 00 1674-99 S n2o CCGG 318.890 0.260 ... H4 2006 02 27 10 53 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213090 SPO 2006 01 26 02 06 00 4281-99 P n2o CCGG 319.300 0.260 ... H4 2006 03 13 09 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213675 SPO 2006 01 26 02 06 00 4282-99 P n2o CCGG 319.460 0.260 ... H4 2006 03 13 09 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213676 SPO 2006 02 01 04 08 00 1663-99 P n2o CCGG 318.470 0.260 ... H4 2006 02 24 09 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213077 SPO 2006 02 01 04 08 00 1664-99 P n2o CCGG 317.850 0.260 ... H4 2006 02 24 09 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 213078 SPO 2006 02 01 04 12 00 4233-99 S n2o CCGG 319.010 0.260 ... H4 2006 02 24 10 46 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213079 SPO 2006 02 01 04 12 00 4234-99 S n2o CCGG 318.570 0.260 ... H4 2006 02 24 11 00 00 -89.9600 -24.8000 2821.30 2810.00 11.30 213080 SPO 2006 02 08 02 46 00 983-99 P n2o CCGG 318.340 0.260 ... H4 2006 12 11 14 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226113 SPO 2006 02 08 02 46 00 984-99 P n2o CCGG 319.160 0.260 ... H4 2006 12 11 14 15 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226114 SPO 2006 02 15 03 09 00 1661-99 P n2o CCGG 318.520 0.260 ... H4 2006 12 11 13 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226111 SPO 2006 02 15 03 09 00 1662-99 P n2o CCGG 318.860 0.260 ... H4 2006 12 11 13 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226112 SPO 2006 02 15 03 12 00 681-99 S n2o CCGG 318.320 0.260 ... H4 2006 12 11 13 33 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226115 SPO 2006 02 15 03 12 00 682-99 S n2o CCGG 318.720 0.260 ... H4 2006 12 11 13 47 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226116 SPO 2006 02 22 02 11 00 3869-99 P n2o CCGG 318.650 0.260 ... H4 2006 12 11 12 36 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226109 SPO 2006 02 22 02 11 00 3870-99 P n2o CCGG 319.630 0.260 ... H4 2006 12 11 12 50 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226110 SPO 2006 03 01 00 08 00 1471-99 P n2o CCGG 318.890 0.260 ... H4 2006 12 18 10 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226119 SPO 2006 03 01 00 08 00 1472-99 P n2o CCGG 318.670 0.260 ... H4 2006 12 18 10 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226120 SPO 2006 03 01 00 17 00 3121-99 S n2o CCGG 317.790 0.260 ... H4 2006 12 18 09 52 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226123 SPO 2006 03 01 00 17 00 3122-99 S n2o CCGG 318.820 0.260 ... H4 2006 12 18 10 06 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226124 SPO 2006 03 08 00 32 00 1227-99 P n2o CCGG 318.490 0.260 ... H4 2006 12 18 09 24 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226117 SPO 2006 03 08 00 32 00 1228-99 P n2o CCGG 318.720 0.260 ... H4 2006 12 18 09 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226118 SPO 2006 03 15 01 06 00 335-99 P n2o CCGG 318.980 0.260 ... H4 2006 12 13 12 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226192 SPO 2006 03 15 01 06 00 336-99 P n2o CCGG 318.130 0.260 ... H4 2006 12 13 12 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226193 SPO 2006 03 15 01 11 00 2835-99 S n2o CCGG 318.910 0.260 ... H4 2006 12 13 12 06 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226194 SPO 2006 03 15 01 11 00 2836-99 S n2o CCGG 318.680 0.260 ... H4 2006 12 13 12 20 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226195 SPO 2006 03 22 01 24 00 1723-99 P n2o CCGG 318.530 0.260 ... H4 2006 12 13 11 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226190 SPO 2006 03 22 01 24 00 1724-99 P n2o CCGG 318.410 0.260 ... H4 2006 12 13 11 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226191 SPO 2006 03 29 00 55 00 397-99 P n2o CCGG 318.360 0.260 ... H4 2006 12 13 11 09 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226188 SPO 2006 03 29 00 55 00 398-99 P n2o CCGG 318.350 0.260 ... H4 2006 12 13 11 24 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226189 SPO 2006 04 03 21 10 00 1187-99 P n2o CCGG 318.520 0.260 ... H4 2006 12 13 14 29 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226198 SPO 2006 04 03 21 10 00 1188-99 P n2o CCGG 317.950 0.260 ... H4 2006 12 13 14 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226199 SPO 2006 04 03 21 15 00 1121-99 S n2o CCGG 318.530 0.260 ... H4 2006 12 13 14 00 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226200 SPO 2006 04 03 21 15 00 1122-99 S n2o CCGG 318.160 0.260 ... H4 2006 12 13 14 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226201 SPO 2006 04 09 23 38 00 3741-99 P n2o CCGG 318.580 0.260 ... H4 2006 12 13 13 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226196 SPO 2006 04 09 23 38 00 3742-99 P n2o CCGG 318.890 0.260 ... H4 2006 12 13 13 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226197 SPO 2006 04 15 00 07 00 1000-99 P n2o CCGG 318.130 0.260 ... H4 2006 12 12 13 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226162 SPO 2006 04 15 00 07 00 999-99 P n2o CCGG 319.170 0.260 ... H4 2006 12 12 13 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226161 SPO 2006 04 15 00 11 00 2635-99 S n2o CCGG 317.910 0.260 ... H4 2006 12 13 13 03 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226202 SPO 2006 04 15 00 11 00 2636-99 S n2o CCGG 318.150 0.260 ... H4 2006 12 13 13 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226203 SPO 2006 04 19 21 20 00 1927-99 P n2o CCGG 318.150 0.260 ... H4 2006 12 12 13 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226159 SPO 2006 04 19 21 20 00 1928-99 P n2o CCGG 318.300 0.260 ... H4 2006 12 12 13 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226160 SPO 2006 04 26 21 52 00 4255-99 P n2o CCGG 318.210 0.260 ... H4 2006 12 12 12 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226157 SPO 2006 04 26 21 52 00 4256-99 P n2o CCGG 318.900 0.260 ... H4 2006 12 12 12 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226158 SPO 2006 05 01 21 11 00 4245-99 P n2o CCGG 318.160 0.260 ... H4 2006 12 15 13 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226167 SPO 2006 05 01 21 11 00 4246-99 P n2o CCGG 318.520 0.260 ... H4 2006 12 15 13 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226168 SPO 2006 05 01 21 18 00 809-99 S n2o CCGG 318.560 0.260 ... H4 2006 12 12 12 06 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226163 SPO 2006 05 01 21 18 00 810-99 S n2o CCGG 315.150 0.260 A.. H4 2006 12 12 12 20 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226164 SPO 2006 05 08 00 14 00 3269-99 P n2o CCGG 318.290 0.260 ... H4 2006 12 15 12 37 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226165 SPO 2006 05 08 00 14 00 3270-99 P n2o CCGG 318.540 0.260 ... H4 2006 12 15 12 51 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226166 SPO 2006 05 15 00 13 00 4259-99 P n2o CCGG 318.410 0.260 ... H4 2006 12 15 11 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226169 SPO 2006 05 15 00 13 00 4260-99 P n2o CCGG 318.120 0.260 ... H4 2006 12 15 11 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226170 SPO 2006 05 15 00 18 00 3733-99 S n2o CCGG 318.390 0.260 ... H4 2006 12 15 12 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226171 SPO 2006 05 15 00 18 00 3734-99 S n2o CCGG 318.300 0.260 ... H4 2006 12 15 12 23 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226172 SPO 2006 05 23 00 17 00 4275-99 P n2o CCGG 318.410 0.260 ... H4 2006 12 13 08 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226097 SPO 2006 05 23 00 17 00 4276-99 P n2o CCGG 317.720 0.260 ... H4 2006 12 13 09 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226098 SPO 2006 06 01 01 11 00 4277-99 P n2o CCGG 318.490 0.260 ... H4 2006 12 12 14 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226095 SPO 2006 06 01 01 11 00 4278-99 P n2o CCGG 318.430 0.260 ... H4 2006 12 12 14 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226096 SPO 2006 06 01 01 16 00 4247-99 S n2o CCGG 318.380 0.260 ... H4 2006 12 12 14 56 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226099 SPO 2006 06 01 01 16 00 4248-99 S n2o CCGG 317.780 0.260 ... H4 2006 12 12 15 11 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226100 SPO 2006 06 08 00 10 00 2495-99 P n2o CCGG 318.180 0.260 ... H4 2006 12 12 13 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226093 SPO 2006 06 08 00 10 00 2496-99 P n2o CCGG 318.920 0.260 ... H4 2006 12 12 14 14 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226094 SPO 2006 06 15 02 11 00 4267-99 P n2o CCGG 319.340 0.260 ... H4 2006 12 12 09 15 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226101 SPO 2006 06 15 02 11 00 4268-99 P n2o CCGG 319.120 0.260 ... H4 2006 12 12 09 29 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226102 SPO 2006 06 15 02 16 00 4271-99 S n2o CCGG 318.010 0.260 ... H4 2006 12 12 09 43 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226107 SPO 2006 06 15 02 16 00 4272-99 S n2o CCGG 318.980 0.260 ... H4 2006 12 12 09 57 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226108 SPO 2006 06 22 23 40 00 2753-99 P n2o CCGG 319.220 0.260 ... H4 2006 12 11 14 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226103 SPO 2006 06 22 23 40 00 2754-99 P n2o CCGG 319.520 0.260 ... H4 2006 12 11 15 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226104 SPO 2006 07 01 01 11 00 2351-99 P n2o CCGG 318.760 0.260 ... H4 2006 12 11 14 30 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226105 SPO 2006 07 01 01 11 00 2352-99 P n2o CCGG 319.240 0.260 ... H4 2006 12 11 14 44 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226106 SPO 2006 07 01 01 17 00 349-99 S n2o CCGG 318.660 0.260 ... H4 2006 12 15 14 02 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226129 SPO 2006 07 01 01 17 00 350-99 S n2o CCGG 318.660 0.260 ... H4 2006 12 15 14 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226130 SPO 2006 07 08 00 55 00 3319-99 P n2o CCGG 318.880 0.260 ... H4 2006 12 15 14 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226125 SPO 2006 07 08 00 55 00 3320-99 P n2o CCGG 319.020 0.260 ... H4 2006 12 15 14 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226126 SPO 2006 07 15 04 11 00 1439-99 P n2o CCGG 318.750 0.260 ... H4 2006 12 15 14 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226127 SPO 2006 07 15 04 11 00 1440-99 P n2o CCGG 319.650 0.260 ... H4 2006 12 15 15 14 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226128 SPO 2006 07 15 04 11 00 3647-99 S n2o CCGG 319.490 0.260 ... H4 2006 12 15 09 18 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226137 SPO 2006 07 15 04 11 00 3648-99 S n2o CCGG 318.600 0.260 ... H4 2006 12 15 09 32 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226138 SPO 2006 07 20 02 31 00 4303-99 P n2o CCGG 319.730 0.260 ... H4 2006 12 15 08 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226135 SPO 2006 07 20 02 31 00 4304-99 P n2o CCGG 319.190 0.260 ... H4 2006 12 15 09 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226136 SPO 2006 07 26 00 47 00 2467-99 P n2o CCGG 318.570 0.260 ... H4 2006 12 14 14 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226133 SPO 2006 07 26 00 47 00 2468-99 P n2o CCGG 319.250 0.260 ... H4 2006 12 14 15 11 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226134 SPO 2006 08 01 04 11 00 4261-99 S n2o CCGG 318.880 0.260 ... H4 2006 12 14 14 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226139 SPO 2006 08 01 04 11 00 4262-99 S n2o CCGG 318.740 0.260 ... H4 2006 12 14 14 43 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226140 SPO 2006 08 01 04 12 00 3931-99 P n2o CCGG 318.820 0.260 ... H4 2006 12 15 11 12 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226208 SPO 2006 08 01 04 12 00 3932-99 P n2o CCGG 319.090 0.260 ... H4 2006 12 15 11 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226209 SPO 2006 08 09 04 21 00 1013-99 P n2o CCGG 318.640 0.260 ... H4 2006 12 15 10 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226206 SPO 2006 08 09 04 21 00 1014-99 P n2o CCGG 318.860 0.260 ... H4 2006 12 15 10 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226207 SPO 2006 08 15 00 19 00 4213-99 S n2o CCGG 319.180 0.260 ... H4 2006 12 15 10 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226210 SPO 2006 08 15 00 19 00 4214-99 S n2o CCGG 318.290 0.260 ... H4 2006 12 15 10 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226211 SPO 2006 08 15 01 12 00 4241-99 P n2o CCGG 318.930 0.260 ... H4 2006 12 15 09 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226204 SPO 2006 08 15 01 12 00 4242-99 P n2o CCGG 318.930 0.260 ... H4 2006 12 15 10 00 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226205 SPO 2006 08 25 01 52 00 1029-99 P n2o CCGG 318.330 0.260 ... H4 2006 12 14 14 00 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226216 SPO 2006 08 25 01 52 00 1030-99 P n2o CCGG 319.290 0.260 ... H4 2006 12 14 14 14 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226217 SPO 2006 09 01 02 11 00 1009-99 P n2o CCGG 319.390 0.260 ... H4 2006 12 14 13 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226214 SPO 2006 09 01 02 11 00 1010-99 P n2o CCGG 318.640 0.260 ... H4 2006 12 14 13 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226215 SPO 2006 09 01 02 11 00 4279-99 S n2o CCGG 318.540 0.260 ... H4 2006 12 14 13 32 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226218 SPO 2006 09 01 02 11 00 4280-99 S n2o CCGG 319.410 0.260 ... H4 2006 12 14 13 46 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226219 SPO 2006 09 08 02 01 00 1955-99 P n2o CCGG 319.830 0.260 ... H4 2006 12 14 12 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226212 SPO 2006 09 08 02 01 00 1956-99 P n2o CCGG 319.350 0.260 ... H4 2006 12 14 12 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226213 SPO 2006 09 15 14 23 00 2275-99 P n2o CCGG 319.870 0.260 ... H4 2006 12 14 09 15 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226173 SPO 2006 09 15 14 23 00 2276-99 P n2o CCGG 319.900 0.260 ... H4 2006 12 14 09 30 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226174 SPO 2006 09 19 01 11 00 4205-99 P n2o CCGG 319.020 0.260 ... H4 2006 12 14 09 44 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226175 SPO 2006 09 19 01 11 00 4206-99 P n2o CCGG 319.230 0.260 ... H4 2006 12 14 09 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226176 SPO 2006 09 19 01 17 00 1609-99 S n2o CCGG 319.020 0.260 ... H4 2006 12 13 14 57 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226178 SPO 2006 09 19 01 17 00 1610-99 S n2o CCGG 319.270 0.260 ... H4 2006 12 13 15 11 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226179 SPO 2006 09 25 15 29 00 4226-99 P n2o CCGG 319.160 0.260 ... H4 2006 12 14 10 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226177 SPO 2006 10 01 14 11 00 4219-99 P n2o CCGG 320.580 0.260 ... H4 2006 12 14 11 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226180 SPO 2006 10 01 14 11 00 4220-99 P n2o CCGG 319.410 0.260 ... H4 2006 12 14 11 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226181 SPO 2006 10 01 14 17 00 3-99 S n2o CCGG 319.150 0.260 ... H4 2006 12 14 11 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226186 SPO 2006 10 01 14 17 00 4-99 S n2o CCGG 319.460 0.260 ... H4 2006 12 14 11 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226187 SPO 2006 10 08 13 31 00 2397-99 P n2o CCGG 319.570 0.260 ... H4 2006 12 18 08 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226121 SPO 2006 10 08 13 31 00 2398-99 P n2o CCGG 319.480 0.260 ... H4 2006 12 18 09 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226122 SPO 2006 10 15 14 42 00 3831-99 P n2o CCGG 319.710 0.260 ... H4 2007 01 10 12 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226786 SPO 2006 10 15 14 42 00 3832-99 P n2o CCGG 319.510 0.260 ... H4 2007 01 10 12 31 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226787 SPO 2006 10 17 15 11 00 4231-99 S n2o CCGG 319.200 0.260 ... H4 2006 12 14 12 06 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226184 SPO 2006 10 17 15 11 00 4232-99 S n2o CCGG 319.970 0.260 ... H4 2006 12 14 12 20 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226185 SPO 2006 10 17 15 14 00 921-99 P n2o CCGG 319.920 0.260 ... H4 2006 12 14 10 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226182 SPO 2006 10 17 15 14 00 922-99 P n2o CCGG 319.640 0.260 ... H4 2006 12 14 10 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226183 SPO 2006 10 24 13 45 00 1923-99 P n2o CCGG 319.740 0.260 ... H4 2007 01 10 11 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226784 SPO 2006 10 24 13 45 00 1924-99 P n2o CCGG 319.880 0.260 ... H4 2007 01 10 12 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226785 SPO 2006 11 05 02 18 00 2469-99 S n2o CCGG 319.670 0.260 ... H4 2007 01 10 12 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226788 SPO 2006 11 05 02 18 00 2470-99 S n2o CCGG 319.550 0.260 ... H4 2007 01 10 13 00 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226789 SPO 2006 11 05 15 13 00 2053-99 P n2o CCGG 319.780 0.260 ... H4 2006 12 26 15 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226792 SPO 2006 11 05 15 13 00 2054-99 P n2o CCGG 319.630 0.260 ... H4 2006 12 26 15 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226793 SPO 2006 11 12 19 46 00 2283-99 P n2o CCGG 320.050 0.260 ... H4 2006 12 27 09 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226796 SPO 2006 11 12 19 46 00 2284-99 P n2o CCGG 319.690 0.260 ... H4 2006 12 27 09 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226797 SPO 2006 11 15 02 14 00 2563-99 S n2o CCGG 319.710 0.260 ... H4 2006 12 26 15 56 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226794 SPO 2006 11 15 02 14 00 2564-99 S n2o CCGG 319.440 0.260 ... H4 2006 12 26 16 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 226795 SPO 2006 11 15 02 15 00 2267-99 P n2o CCGG 319.530 0.260 ... H4 2006 12 27 10 07 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226790 SPO 2006 11 15 02 15 00 2268-99 P n2o CCGG 320.380 0.260 ... H4 2006 12 27 10 21 00 -89.9600 -24.8000 2815.00 2810.00 5.00 226791 SPO 2006 11 22 22 21 00 749-99 P n2o CCGG 319.650 0.260 ... H4 2007 02 12 13 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228900 SPO 2006 11 22 22 21 00 750-99 P n2o CCGG 319.630 0.260 ... H4 2007 02 12 14 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228901 SPO 2006 12 01 00 14 00 2791-99 S n2o CCGG 318.910 0.260 ... H4 2007 02 12 12 50 00 -89.9600 -24.8000 2821.30 2810.00 11.30 228902 SPO 2006 12 01 00 14 00 2792-99 S n2o CCGG 319.510 0.260 ... H4 2007 02 12 13 05 00 -89.9600 -24.8000 2821.30 2810.00 11.30 228903 SPO 2006 12 01 00 21 00 4243-99 P n2o CCGG 319.390 0.260 ... H4 2007 02 12 13 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228904 SPO 2006 12 01 00 21 00 4244-99 P n2o CCGG 319.490 0.260 ... H4 2007 02 12 13 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228905 SPO 2006 12 08 03 07 00 2663-99 P n2o CCGG 319.370 0.260 ... H4 2007 02 13 15 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228894 SPO 2006 12 08 03 07 00 2664-99 P n2o CCGG 319.660 0.260 ... H4 2007 02 13 15 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228895 SPO 2006 12 18 03 11 00 3995-99 P n2o CCGG 319.150 0.260 ... H4 2007 02 13 14 38 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228892 SPO 2006 12 18 03 11 00 3996-99 P n2o CCGG 319.290 0.260 ... H4 2007 02 13 14 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228893 SPO 2006 12 18 03 12 00 4287-99 S n2o CCGG 313.790 0.260 A.. H4 2007 02 13 14 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 228896 SPO 2006 12 18 03 12 00 4288-99 S n2o CCGG 319.170 0.260 ... H4 2007 02 13 14 23 00 -89.9600 -24.8000 2821.30 2810.00 11.30 228897 SPO 2006 12 23 22 37 00 4289-99 P n2o CCGG 291.930 0.260 N.. H4 2007 02 13 13 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228890 SPO 2006 12 23 22 37 00 4290-99 P n2o CCGG 194.610 -999.990 N.. H4 2007 02 13 13 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 228891 SPO 2007 01 01 22 12 00 3051-99 P n2o CCGG 320.210 0.260 ... H4 2007 03 14 09 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230387 SPO 2007 01 01 22 12 00 3052-99 P n2o CCGG 319.980 0.260 ... H4 2007 03 14 09 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230388 SPO 2007 01 01 22 12 00 432-99 S n2o CCGG 319.390 0.260 ... H4 2007 02 16 12 03 00 -89.9600 -24.8000 2821.30 2810.00 11.30 228899 SPO 2007 01 09 20 26 00 2057-99 P n2o CCGG 319.610 0.260 ... H4 2007 03 13 16 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230385 SPO 2007 01 09 20 26 00 2058-99 P n2o CCGG 319.510 0.260 ... H4 2007 03 13 16 57 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230386 SPO 2007 01 15 22 15 00 4487-99 S n2o CCGG 319.480 0.260 ... H4 2007 03 14 15 01 00 -89.9600 -24.8000 2821.30 2810.00 11.30 230375 SPO 2007 01 15 22 15 00 4488-99 S n2o CCGG 319.420 0.260 ... H4 2007 03 14 15 15 00 -89.9600 -24.8000 2821.30 2810.00 11.30 230376 SPO 2007 01 15 22 37 00 1657-99 P n2o CCGG 319.810 0.260 ... H4 2007 03 14 08 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230383 SPO 2007 01 15 22 37 00 1658-99 P n2o CCGG 319.500 0.260 ... H4 2007 03 14 09 04 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230384 SPO 2007 01 24 05 00 00 835-99 P n2o CCGG 319.820 0.260 ... H4 2007 03 14 09 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230381 SPO 2007 01 24 05 00 00 836-99 P n2o CCGG 319.220 0.260 ... H4 2007 03 14 10 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230382 SPO 2007 02 01 04 12 00 1287-99 S n2o CCGG 319.320 0.260 ... H4 2007 03 14 15 29 00 -89.9600 -24.8000 2821.30 2810.00 11.30 230377 SPO 2007 02 01 04 12 00 1288-99 S n2o CCGG 319.510 0.260 ... H4 2007 03 14 15 43 00 -89.9600 -24.8000 2821.30 2810.00 11.30 230378 SPO 2007 02 01 04 12 00 2797-99 P n2o CCGG 319.380 0.260 ... H4 2007 03 14 14 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230379 SPO 2007 02 01 04 12 00 2797-99 P n2o CCGG 321.080 0.260 A.. H4 2007 03 14 16 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230379 SPO 2007 02 01 04 12 00 2798-99 P n2o CCGG 319.450 0.260 ... H4 2007 03 14 14 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230380 SPO 2007 02 01 04 12 00 2798-99 P n2o CCGG 320.640 0.260 A.. H4 2007 03 14 16 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 230380 SPO 2007 02 08 20 20 00 2627-99 P n2o CCGG 319.920 0.260 ... H4 2007 12 17 14 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246348 SPO 2007 02 08 20 20 00 2628-99 P n2o CCGG 319.210 0.260 ... H4 2007 12 17 15 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246349 SPO 2007 02 15 02 19 00 1843-99 S n2o CCGG 319.350 0.260 ... H4 2007 12 17 15 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246346 SPO 2007 02 15 02 19 00 1844-99 S n2o CCGG 318.910 0.260 ... H4 2007 12 17 15 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246347 SPO 2007 02 15 20 12 00 385-99 P n2o CCGG 319.030 0.260 ... H4 2007 12 21 12 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246368 SPO 2007 02 15 20 12 00 386-99 P n2o CCGG 318.700 0.260 ... H4 2007 12 21 13 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246369 SPO 2007 02 25 00 09 00 4151-99 P n2o CCGG 319.320 0.260 ... H4 2007 12 21 13 44 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246370 SPO 2007 02 25 00 09 00 4152-99 P n2o CCGG 319.660 0.260 ... H4 2007 12 21 13 58 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246371 SPO 2007 03 01 01 11 00 323-99 P n2o CCGG 319.640 0.260 ... H4 2007 12 17 14 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246350 SPO 2007 03 01 01 11 00 324-99 P n2o CCGG 318.980 0.260 ... H4 2007 12 17 14 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246351 SPO 2007 03 01 01 18 00 3683-99 S n2o CCGG 318.620 0.260 ... H4 2007 12 17 13 22 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246344 SPO 2007 03 01 01 18 00 3684-99 S n2o CCGG 319.270 0.260 ... H4 2007 12 17 13 36 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246345 SPO 2007 03 08 05 00 00 27-99 P n2o CCGG 319.600 0.260 ... H4 2007 12 21 12 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246366 SPO 2007 03 08 05 00 00 28-99 P n2o CCGG 319.350 0.260 ... H4 2007 12 21 12 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246367 SPO 2007 03 15 02 17 00 1195-99 S n2o CCGG 319.580 0.260 ... H4 2007 12 21 13 16 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246352 SPO 2007 03 15 02 17 00 1196-99 S n2o CCGG 319.110 0.260 ... H4 2007 12 21 13 30 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246353 SPO 2007 03 15 12 34 56 1653-99 P n2o CCGG 319.400 0.260 ... H4 2007 12 20 09 09 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246418 SPO 2007 03 15 12 34 56 1654-99 P n2o CCGG 319.010 0.260 ... H4 2007 12 20 09 23 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246419 SPO 2007 03 24 04 12 00 1469-99 P n2o CCGG 319.060 0.260 ... H4 2007 12 20 09 37 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246414 SPO 2007 03 24 04 12 00 1470-99 P n2o CCGG 318.990 0.260 ... H4 2007 12 20 09 52 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246415 SPO 2007 04 02 04 12 00 1991-99 P n2o CCGG 318.960 0.260 ... H4 2007 12 20 13 30 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246424 SPO 2007 04 02 04 12 00 1992-99 P n2o CCGG 319.260 0.260 ... H4 2007 12 20 13 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246425 SPO 2007 04 02 04 16 00 2767-99 S n2o CCGG 319.010 0.260 ... H4 2007 12 20 13 02 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246420 SPO 2007 04 02 04 16 00 2768-99 S n2o CCGG 319.080 0.260 ... H4 2007 12 20 13 16 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246421 SPO 2007 04 11 00 12 00 2305-99 P n2o CCGG 318.950 0.260 ... H4 2007 12 20 10 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246416 SPO 2007 04 11 00 12 00 2306-99 P n2o CCGG 319.260 0.260 ... H4 2007 12 20 10 49 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246417 SPO 2007 04 16 03 11 00 2577-99 P n2o CCGG 319.270 0.260 ... H4 2007 12 20 10 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246412 SPO 2007 04 16 03 11 00 2578-99 P n2o CCGG 318.550 0.260 ... H4 2007 12 20 10 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246413 SPO 2007 04 16 03 17 00 1551-99 S n2o CCGG 319.110 0.260 ... H4 2007 12 20 13 59 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246422 SPO 2007 04 16 03 17 00 1552-99 S n2o CCGG 319.050 0.260 ... H4 2007 12 20 14 13 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246423 SPO 2007 04 24 03 16 00 3915-99 P n2o CCGG 319.070 0.260 ... H4 2007 12 20 14 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246426 SPO 2007 04 24 03 16 00 3916-99 P n2o CCGG 319.030 0.260 ... H4 2007 12 20 14 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246427 SPO 2007 05 01 03 10 00 245-99 P n2o CCGG 319.220 0.260 ... H4 2007 12 26 11 23 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246791 SPO 2007 05 01 03 10 00 246-99 P n2o CCGG 318.550 0.260 ... H4 2007 12 26 11 37 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246792 SPO 2007 05 01 03 15 00 973-99 S n2o CCGG 318.700 0.260 ... H4 2007 12 26 14 14 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246789 SPO 2007 05 01 03 15 00 974-99 S n2o CCGG 318.260 0.260 ... H4 2007 12 26 14 28 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246790 SPO 2007 05 08 05 05 00 3599-99 P n2o CCGG 318.940 0.260 ... H4 2007 12 28 10 34 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246801 SPO 2007 05 08 05 05 00 3600-99 P n2o CCGG 318.820 0.260 ... H4 2007 12 28 10 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246802 SPO 2007 05 15 01 11 00 3471-99 P n2o CCGG 318.670 0.260 ... H4 2007 12 26 12 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246795 SPO 2007 05 15 01 11 00 3472-99 P n2o CCGG 319.610 0.260 ... H4 2007 12 26 13 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246796 SPO 2007 05 15 01 17 00 355-99 S n2o CCGG 318.990 0.260 ... H4 2007 12 28 11 02 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246797 SPO 2007 05 15 01 17 00 356-99 S n2o CCGG 318.700 0.260 ... H4 2007 12 28 11 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246798 SPO 2007 05 24 02 11 00 261-99 P n2o CCGG 319.090 0.260 ... H4 2007 12 26 13 45 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246793 SPO 2007 05 24 02 11 00 262-99 P n2o CCGG 319.030 0.260 ... H4 2007 12 26 13 59 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246794 SPO 2007 06 01 02 13 00 2687-99 P n2o CCGG 318.670 0.260 ... H4 2007 12 28 10 05 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246803 SPO 2007 06 01 02 13 00 2688-99 P n2o CCGG 319.380 0.260 ... H4 2007 12 28 10 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246804 SPO 2007 06 01 02 19 00 127-99 S n2o CCGG 319.170 0.260 ... H4 2007 12 28 11 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246799 SPO 2007 06 01 02 19 00 128-99 S n2o CCGG 318.650 0.260 ... H4 2007 12 28 11 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246800 SPO 2007 06 08 05 06 00 1343-99 P n2o CCGG 319.060 0.260 ... H4 2007 12 19 10 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246386 SPO 2007 06 08 05 06 00 1344-99 P n2o CCGG 319.420 0.260 ... H4 2007 12 19 10 43 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246387 SPO 2007 06 15 04 12 00 2099-99 P n2o CCGG 319.060 0.260 ... H4 2007 12 19 12 22 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246388 SPO 2007 06 15 04 12 00 2100-99 P n2o CCGG 318.970 0.260 ... H4 2007 12 19 12 37 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246389 SPO 2007 06 15 04 17 00 4595-99 S n2o CCGG 319.350 0.260 ... H4 2007 12 19 14 16 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246392 SPO 2007 06 15 04 17 00 4596-99 S n2o CCGG 319.060 0.260 ... H4 2007 12 19 14 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246393 SPO 2007 06 24 04 08 00 2453-99 P n2o CCGG 319.160 0.260 ... H4 2007 12 19 16 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246398 SPO 2007 06 24 04 08 00 2454-99 P n2o CCGG 319.430 0.260 ... H4 2007 12 19 16 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246399 SPO 2007 07 01 01 10 00 2709-99 P n2o CCGG 319.870 0.260 ... H4 2007 12 19 11 54 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246390 SPO 2007 07 01 01 10 00 2710-99 P n2o CCGG 319.680 0.260 ... H4 2007 12 19 12 08 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246391 SPO 2007 07 01 01 15 00 2455-99 S n2o CCGG 318.640 0.260 ... H4 2007 12 19 12 51 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246384 SPO 2007 07 01 01 15 00 2456-99 S n2o CCGG 319.390 0.260 ... H4 2007 12 19 13 05 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246385 SPO 2007 07 09 21 09 00 895-99 P n2o CCGG 319.360 0.260 ... H4 2007 12 19 15 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246396 SPO 2007 07 09 21 09 00 896-99 P n2o CCGG 319.520 0.260 ... H4 2007 12 19 15 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246397 SPO 2007 07 17 22 10 00 3123-99 P n2o CCGG 319.520 0.260 ... H4 2007 12 19 16 10 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246394 SPO 2007 07 17 22 10 00 3124-99 P n2o CCGG 319.060 0.260 ... H4 2007 12 19 16 24 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246395 SPO 2007 07 17 22 15 00 1613-99 S n2o CCGG 319.570 0.260 ... H4 2007 12 19 14 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246456 SPO 2007 07 17 22 15 00 1614-99 S n2o CCGG 319.040 0.260 ... H4 2007 12 19 14 59 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246457 SPO 2007 07 24 04 06 00 709-99 P n2o CCGG 319.690 0.260 ... H4 2007 12 19 13 48 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246458 SPO 2007 07 24 04 06 00 710-99 P n2o CCGG 319.600 0.260 ... H4 2007 12 19 14 02 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246459 SPO 2007 08 01 03 11 00 3965-99 P n2o CCGG 319.910 0.260 ... H4 2007 12 17 16 14 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246470 SPO 2007 08 01 03 11 00 3966-99 P n2o CCGG 319.770 0.260 ... H4 2007 12 17 16 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246471 SPO 2007 08 01 03 14 00 2919-99 S n2o CCGG 319.150 0.260 ... H4 2007 12 17 16 42 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246466 SPO 2007 08 01 03 14 00 2920-99 S n2o CCGG 318.870 0.260 ... H4 2007 12 17 16 56 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246467 SPO 2007 08 08 02 11 00 437-99 P n2o CCGG 319.430 0.260 ... H4 2007 12 19 13 19 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246462 SPO 2007 08 08 02 11 00 438-99 P n2o CCGG 319.490 0.260 ... H4 2007 12 19 13 33 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246463 SPO 2007 08 15 05 11 00 329-99 P n2o CCGG 319.410 0.260 ... H4 2007 12 19 15 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246460 SPO 2007 08 15 05 11 00 330-99 P n2o CCGG 319.930 0.260 ... H4 2007 12 19 15 28 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246461 SPO 2007 08 15 05 16 00 2425-99 S n2o CCGG 319.160 0.260 ... H4 2007 12 17 15 45 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246464 SPO 2007 08 15 05 16 00 2426-99 S n2o CCGG 319.480 0.260 ... H4 2007 12 17 15 59 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246465 SPO 2007 08 24 03 14 00 2785-99 P n2o CCGG 318.810 0.260 ... H4 2007 12 17 13 51 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246468 SPO 2007 08 24 03 14 00 2786-99 P n2o CCGG 319.450 0.260 ... H4 2007 12 17 14 06 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246469 SPO 2007 09 03 03 11 00 3679-99 P n2o CCGG 319.080 0.260 ... H4 2007 12 26 14 42 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246779 SPO 2007 09 03 03 11 00 3680-99 P n2o CCGG 320.030 0.260 ... H4 2007 12 26 14 56 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246780 SPO 2007 09 03 03 15 00 865-99 S n2o CCGG 319.380 0.260 ... H4 2007 12 26 15 11 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246773 SPO 2007 09 03 03 15 00 866-99 S n2o CCGG 319.460 0.260 ... H4 2007 12 26 15 25 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246774 SPO 2007 09 10 03 14 00 3187-99 P n2o CCGG 319.990 0.260 ... H4 2007 12 21 14 41 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246785 SPO 2007 09 10 03 14 00 3188-99 P n2o CCGG 319.920 0.260 ... H4 2007 12 21 14 55 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246786 SPO 2007 09 15 11 10 00 4587-99 P n2o CCGG 319.680 0.260 ... H4 2007 12 26 10 26 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246783 SPO 2007 09 15 11 10 00 4588-99 P n2o CCGG 319.880 0.260 ... H4 2007 12 26 10 40 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246784 SPO 2007 09 15 11 14 00 1851-99 S n2o CCGG 319.920 0.260 ... H4 2007 12 26 13 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246775 SPO 2007 09 15 11 14 00 1852-99 S n2o CCGG 319.640 0.260 ... H4 2007 12 26 13 31 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246776 SPO 2007 09 24 03 18 00 4047-99 P n2o CCGG 319.950 0.260 ... H4 2007 12 26 15 39 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246777 SPO 2007 09 24 03 18 00 4048-99 P n2o CCGG 320.390 0.260 ... H4 2007 12 26 15 53 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246778 SPO 2007 10 01 02 10 00 3301-99 P n2o CCGG 319.890 0.260 ... H4 2007 12 21 14 13 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246787 SPO 2007 10 01 02 10 00 3302-99 P n2o CCGG 320.400 0.260 ... H4 2007 12 21 14 27 00 -89.9600 -24.8000 2815.00 2810.00 5.00 246788 SPO 2007 10 01 02 19 00 3487-99 S n2o CCGG 320.070 0.260 ... H4 2007 12 21 15 10 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246781 SPO 2007 10 01 02 19 00 3488-99 S n2o CCGG 320.130 0.260 ... H4 2007 12 21 15 24 00 -89.9600 -24.8000 2821.30 2810.00 11.30 246782 SPO 2007 10 08 07 07 00 1201-99 P n2o CCGG 320.160 0.260 ... H4 2008 01 10 13 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247620 SPO 2007 10 08 07 07 00 1202-99 P n2o CCGG 320.330 0.260 ... H4 2008 01 10 13 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247621 SPO 2007 10 15 03 10 00 2307-99 P n2o CCGG 321.050 0.260 ... H4 2008 01 15 12 46 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247628 SPO 2007 10 15 03 10 00 2308-99 P n2o CCGG 320.000 0.260 ... H4 2008 01 15 13 00 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247629 SPO 2007 10 15 03 13 00 2073-99 S n2o CCGG 320.370 0.260 ... H4 2008 01 15 09 55 00 -89.9600 -24.8000 2821.30 2810.00 11.30 247624 SPO 2007 10 15 03 13 00 2074-99 S n2o CCGG 319.760 0.260 ... H4 2008 01 15 10 09 00 -89.9600 -24.8000 2821.30 2810.00 11.30 247625 SPO 2007 10 24 04 10 00 907-99 P n2o CCGG 320.240 0.260 ... H4 2008 01 14 14 47 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247632 SPO 2007 10 24 04 10 00 908-99 P n2o CCGG 319.910 0.260 ... H4 2008 01 14 15 01 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247633 SPO 2007 11 01 03 14 00 847-99 S n2o CCGG 320.210 0.260 ... H4 2008 01 15 12 17 00 -89.9600 -24.8000 2821.30 2810.00 11.30 247626 SPO 2007 11 01 03 14 00 848-99 S n2o CCGG 320.450 0.260 ... H4 2008 01 15 12 32 00 -89.9600 -24.8000 2821.30 2810.00 11.30 247627 SPO 2007 11 01 04 44 00 619-99 P n2o CCGG 320.800 0.260 ... H4 2008 01 10 13 03 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247622 SPO 2007 11 01 04 44 00 620-99 P n2o CCGG 320.250 0.260 ... H4 2008 01 10 13 17 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247623 SPO 2007 11 09 23 08 00 2387-99 P n2o CCGG 321.070 0.260 ... H4 2008 01 15 11 20 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247630 SPO 2007 11 09 23 08 00 2388-99 P n2o CCGG 320.220 0.260 ... H4 2008 01 15 11 35 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247631 SPO 2007 11 17 21 15 00 2233-99 S n2o CCGG 320.390 0.260 ... H4 2008 02 11 11 02 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249127 SPO 2007 11 17 21 15 00 2234-99 S n2o CCGG 321.060 0.260 ... H4 2008 02 11 11 16 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249128 SPO 2007 11 17 22 15 00 2427-99 P n2o CCGG 321.020 0.260 ... H4 2008 01 14 14 18 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247634 SPO 2007 11 17 22 15 00 2428-99 P n2o CCGG 320.390 0.260 ... H4 2008 01 14 14 32 00 -89.9600 -24.8000 2815.00 2810.00 5.00 247635 SPO 2007 11 26 23 16 00 989-99 P n2o CCGG 319.590 0.260 ... H4 2008 02 11 09 37 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249131 SPO 2007 11 26 23 16 00 990-99 P n2o CCGG 320.350 0.260 ... H4 2008 02 11 09 51 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249132 SPO 2007 12 02 23 13 00 429-99 S n2o CCGG 320.290 0.260 ... H4 2008 02 11 10 05 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249125 SPO 2007 12 02 23 13 00 430-99 S n2o CCGG 320.840 0.260 ... H4 2008 02 11 10 19 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249126 SPO 2007 12 02 23 18 00 2929-99 P n2o CCGG 320.860 0.260 ... H4 2008 02 11 10 34 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249129 SPO 2007 12 02 23 18 00 2930-99 P n2o CCGG 320.730 0.260 ... H4 2008 02 11 10 48 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249130 SPO 2007 12 08 00 20 00 3393-99 P n2o CCGG 320.440 0.260 ... H4 2008 02 07 13 19 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249123 SPO 2007 12 08 00 20 00 3394-99 P n2o CCGG 320.400 0.260 ... H4 2008 02 07 13 34 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249124 SPO 2007 12 15 03 20 00 1519-99 P n2o CCGG 321.180 0.260 ... H4 2008 02 07 12 51 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249121 SPO 2007 12 15 03 20 00 1520-99 P n2o CCGG 321.000 0.260 ... H4 2008 02 07 13 05 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249122 SPO 2007 12 15 04 13 00 1617-99 S n2o CCGG 320.880 0.260 ... H4 2008 02 07 12 22 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249117 SPO 2007 12 15 04 13 00 1618-99 S n2o CCGG 320.700 0.260 ... H4 2008 02 07 12 37 00 -89.9700 -24.8000 2821.30 2810.00 11.30 249118 SPO 2007 12 25 01 18 00 3857-99 P n2o CCGG 320.800 0.260 ... H4 2008 02 07 11 53 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249119 SPO 2007 12 25 01 18 00 3858-99 P n2o CCGG 320.520 0.260 ... H4 2008 02 07 12 07 00 -89.9700 -24.8000 2815.00 2810.00 5.00 249120 SPO 2008 01 01 00 14 00 3812-99 P n2o CCGG 320.990 0.260 ... H4 2008 02 21 15 16 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250021 SPO 2008 01 01 01 12 00 2365-99 S n2o CCGG 320.050 0.260 ... H4 2008 02 26 16 41 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250011 SPO 2008 01 01 01 12 00 2366-99 S n2o CCGG 319.770 0.260 ... H4 2008 02 26 16 56 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250012 SPO 2008 01 09 00 40 00 2722-99 S n2o CCGG 320.900 0.260 ... H4 2008 02 28 12 03 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250017 SPO 2008 01 09 00 40 00 407-99 S n2o CCGG 320.970 0.260 ... H4 2008 02 28 12 17 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250018 SPO 2008 01 09 01 00 00 3811-99 P n2o CCGG 320.600 0.260 ... H4 2008 02 28 11 35 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250019 SPO 2008 01 09 01 00 00 408-99 P n2o CCGG 320.340 0.260 ... H4 2008 02 28 11 49 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250020 SPO 2008 01 15 01 10 00 2409-99 P n2o CCGG 320.740 0.260 ... H4 2008 02 26 16 13 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250013 SPO 2008 01 15 01 10 00 2410-99 P n2o CCGG 320.350 0.260 ... H4 2008 02 26 16 27 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250014 SPO 2008 01 15 01 14 00 3401-99 S n2o CCGG 320.360 0.260 ... H4 2008 02 26 15 16 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250009 SPO 2008 01 15 01 14 00 3402-99 S n2o CCGG 319.530 0.260 ... H4 2008 02 26 15 30 00 -89.9700 -24.8000 2821.30 2810.00 11.30 250010 SPO 2008 01 24 01 14 00 4201-99 P n2o CCGG 320.470 0.260 ... H4 2008 02 26 14 48 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250015 SPO 2008 01 24 01 14 00 4202-99 P n2o CCGG 320.740 0.260 ... H4 2008 02 26 15 02 00 -89.9700 -24.8000 2815.00 2810.00 5.00 250016 SPO 2008 02 01 02 11 00 2895-99 S n2o CCGG 319.650 0.260 ... H6 2008 12 16 13 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265662 SPO 2008 02 01 02 11 00 2896-99 S n2o CCGG 319.860 0.260 ... H6 2008 12 16 13 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265663 SPO 2008 02 01 02 15 00 3293-99 P n2o CCGG 320.100 0.260 ... H6 2008 12 16 12 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265660 SPO 2008 02 01 02 15 00 3294-99 P n2o CCGG 320.500 0.260 ... H6 2008 12 16 13 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265661 SPO 2008 02 08 22 11 00 2193-99 P n2o CCGG 320.020 0.260 ... H6 2008 12 16 11 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265664 SPO 2008 02 08 22 11 00 2194-99 P n2o CCGG 320.190 0.260 ... H6 2008 12 16 11 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265665 SPO 2008 02 16 22 09 00 2873-99 P n2o CCGG 320.330 0.260 ... H6 2008 12 17 16 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265658 SPO 2008 02 16 22 09 00 2874-99 P n2o CCGG 320.240 0.260 ... H6 2008 12 17 16 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265659 SPO 2008 02 16 23 12 00 3227-99 S n2o CCGG 320.590 0.260 ... H6 2008 12 16 10 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265666 SPO 2008 02 16 23 12 00 3228-99 S n2o CCGG 320.000 0.260 ... H6 2008 12 16 10 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265667 SPO 2008 02 24 03 08 00 163-99 P n2o CCGG 319.840 0.260 ... H6 2008 12 17 16 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265656 SPO 2008 02 24 03 08 00 164-99 P n2o CCGG 319.870 0.260 ... H6 2008 12 17 16 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265657 SPO 2008 03 03 01 16 00 61-99 P n2o CCGG 320.090 0.260 ... H6 2008 12 17 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265652 SPO 2008 03 03 01 16 00 62-99 P n2o CCGG 319.910 0.260 ... H6 2008 12 17 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265653 SPO 2008 03 03 01 18 00 913-99 S n2o CCGG 319.890 0.260 ... H6 2008 12 17 15 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265654 SPO 2008 03 03 01 18 00 914-99 S n2o CCGG 320.170 0.260 ... H6 2008 12 17 15 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265655 SPO 2008 03 08 01 14 00 1559-99 P n2o CCGG 319.880 0.260 ... H6 2009 01 06 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265682 SPO 2008 03 08 01 14 00 1560-99 P n2o CCGG 320.240 0.260 ... H6 2009 01 06 13 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265683 SPO 2008 03 15 00 11 00 1937-99 P n2o CCGG 320.600 0.260 ... H6 2009 01 05 11 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265672 SPO 2008 03 15 00 11 00 1938-99 P n2o CCGG 321.000 0.260 ... H6 2009 01 05 11 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265673 SPO 2008 03 15 00 19 00 1963-99 S n2o CCGG 320.430 0.260 ... H6 2009 01 05 13 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265674 SPO 2008 03 15 00 19 00 1964-99 S n2o CCGG 319.870 0.260 ... H6 2009 01 05 13 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265675 SPO 2008 03 24 00 11 00 1659-99 P n2o CCGG 319.970 0.260 ... H6 2009 01 06 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265680 SPO 2008 03 24 00 11 00 1660-99 P n2o CCGG 320.100 0.260 ... H6 2009 01 06 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265681 SPO 2008 04 01 00 12 00 1293-99 P n2o CCGG 319.930 0.260 ... H6 2009 01 06 11 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265678 SPO 2008 04 01 00 12 00 1294-99 P n2o CCGG 319.830 0.260 ... H6 2009 01 06 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265679 SPO 2008 04 01 00 19 00 829-99 S n2o CCGG 319.850 0.260 ... H6 2009 01 06 11 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265676 SPO 2008 04 01 00 19 00 830-99 S n2o CCGG 320.040 0.260 ... H6 2009 01 06 11 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265677 SPO 2008 04 08 03 06 00 315-99 P n2o CCGG 320.190 0.260 ... H6 2009 01 05 10 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265670 SPO 2008 04 08 03 06 00 316-99 P n2o CCGG 319.900 0.260 ... H6 2009 01 05 10 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265671 SPO 2008 04 15 00 12 00 341-99 P n2o CCGG 320.080 0.260 ... H6 2009 01 05 11 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265668 SPO 2008 04 15 00 12 00 342-99 P n2o CCGG 320.630 0.260 ... H6 2009 01 05 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265669 SPO 2008 04 15 00 18 00 4131-99 S n2o CCGG 319.910 0.260 ... H6 2008 12 17 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265650 SPO 2008 04 15 00 18 00 4132-99 S n2o CCGG 320.010 0.260 ... H6 2008 12 17 13 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265651 SPO 2008 05 01 01 07 00 3913-99 P n2o CCGG 320.160 0.260 ... H6 2008 12 17 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265648 SPO 2008 05 01 01 07 00 3914-99 P n2o CCGG 320.020 0.260 ... H6 2008 12 17 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265649 SPO 2008 05 01 02 14 00 1407-99 S n2o CCGG 320.010 0.260 ... H6 2008 12 17 10 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265646 SPO 2008 05 01 02 14 00 1408-99 S n2o CCGG 319.720 0.260 ... H6 2008 12 17 10 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265647 SPO 2008 05 08 02 08 00 1921-99 P n2o CCGG 319.930 0.260 ... H6 2008 12 17 11 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265644 SPO 2008 05 08 02 08 00 1922-99 P n2o CCGG 319.710 0.260 ... H6 2008 12 17 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265645 SPO 2008 05 15 00 12 00 4701-99 P n2o CCGG 320.500 0.260 ... H6 2009 01 05 12 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265642 SPO 2008 05 15 00 12 00 4702-99 P n2o CCGG 320.520 0.260 ... H6 2009 01 05 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265643 SPO 2008 05 15 00 17 00 2595-99 S n2o CCGG 320.060 0.260 ... H6 2009 01 05 12 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265640 SPO 2008 05 15 00 17 00 2596-99 S n2o CCGG 319.810 0.260 ... H6 2009 01 05 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265641 SPO 2008 05 24 02 06 00 3847-99 P n2o CCGG 319.920 0.260 ... H6 2008 12 31 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265636 SPO 2008 05 24 02 06 00 3848-99 P n2o CCGG 320.100 0.260 ... H6 2008 12 31 14 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265637 SPO 2008 06 01 00 06 00 4049-99 P n2o CCGG 319.650 0.260 ... H6 2009 01 05 13 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265638 SPO 2008 06 01 00 06 00 4050-99 P n2o CCGG 319.680 0.260 ... H6 2009 01 05 13 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265639 SPO 2008 06 01 01 12 00 511-99 S n2o CCGG 319.960 0.260 ... H6 2008 12 18 14 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265721 SPO 2008 06 01 01 12 00 512-99 S n2o CCGG 319.770 0.260 ... H6 2008 12 18 14 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265722 SPO 2008 06 08 01 10 00 1329-99 P n2o CCGG 320.290 0.260 ... H6 2008 12 18 14 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265723 SPO 2008 06 08 01 10 00 1330-99 P n2o CCGG 320.530 0.260 ... H6 2008 12 18 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265724 SPO 2008 06 16 15 12 00 993-99 P n2o CCGG 320.130 0.260 ... H6 2008 12 18 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265719 SPO 2008 06 16 15 12 00 994-99 P n2o CCGG 319.630 0.260 ... H6 2008 12 18 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265720 SPO 2008 06 16 15 18 00 1823-99 S n2o CCGG 319.540 0.260 ... H6 2009 01 06 14 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265715 SPO 2008 06 16 15 18 00 1824-99 S n2o CCGG 319.670 0.260 ... H6 2009 01 06 15 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265716 SPO 2008 06 24 01 08 00 3841-99 P n2o CCGG 318.250 0.260 A.. H6 2008 12 18 13 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265717 SPO 2008 06 24 01 08 00 3842-99 P n2o CCGG 320.350 0.260 ... H6 2008 12 18 13 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265718 SPO 2008 07 01 04 11 00 2521-99 P n2o CCGG 320.080 0.260 ... H6 2009 01 06 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265713 SPO 2008 07 01 04 11 00 2522-99 P n2o CCGG 320.080 0.260 ... H6 2009 01 06 14 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265714 SPO 2008 07 01 04 16 00 3433-99 S n2o CCGG 320.080 0.260 ... H6 2009 01 06 13 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265711 SPO 2008 07 01 04 16 00 3434-99 S n2o CCGG 319.900 0.260 ... H6 2009 01 06 14 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265712 SPO 2008 07 08 00 09 00 4077-99 P n2o CCGG 320.850 0.260 ... H6 2008 12 31 13 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265705 SPO 2008 07 08 00 09 00 4078-99 P n2o CCGG 320.020 0.260 ... H6 2008 12 31 13 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265706 SPO 2008 07 15 01 16 00 2961-99 P n2o CCGG 319.880 0.260 ... H6 2008 12 31 13 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265707 SPO 2008 07 15 01 16 00 2962-99 P n2o CCGG 320.130 0.260 ... H6 2008 12 31 13 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265708 SPO 2008 07 15 01 20 00 2013-99 S n2o CCGG 320.390 0.260 ... H6 2008 12 31 14 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265709 SPO 2008 07 15 01 20 00 2014-99 S n2o CCGG 320.150 0.260 ... H6 2008 12 31 14 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265710 SPO 2008 07 24 06 09 00 4449-99 P n2o CCGG 320.830 0.260 ... H6 2008 12 31 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265703 SPO 2008 07 24 06 09 00 4450-99 P n2o CCGG 320.740 0.260 ... H6 2008 12 31 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265704 SPO 2008 08 01 00 13 00 2283-99 S n2o CCGG 320.370 0.260 ... H6 2009 01 12 10 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265700 SPO 2008 08 01 01 11 00 1225-99 P n2o CCGG 320.500 0.260 ... H6 2009 01 07 13 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265701 SPO 2008 08 01 01 11 00 1226-99 P n2o CCGG 321.240 0.260 ... H6 2009 01 07 13 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265702 SPO 2008 08 08 03 12 00 3971-99 P n2o CCGG 320.460 0.260 ... H6 2009 01 07 10 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265698 SPO 2008 08 08 03 12 00 3972-99 P n2o CCGG 320.550 0.260 ... H6 2009 01 07 10 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265699 SPO 2008 08 15 03 12 00 4727-99 P n2o CCGG 320.780 0.260 ... H6 2009 01 07 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265771 SPO 2008 08 15 03 12 00 4728-99 P n2o CCGG 320.580 0.260 ... H6 2009 01 07 13 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265772 SPO 2008 08 15 03 16 00 1035-99 S n2o CCGG 320.740 0.260 ... H6 2009 01 08 12 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265785 SPO 2008 08 15 03 16 00 1036-99 S n2o CCGG 320.280 0.260 ... H6 2009 01 08 12 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265786 SPO 2008 08 24 00 06 00 4259-99 P n2o CCGG 320.550 0.260 ... H6 2009 01 08 10 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265781 SPO 2008 08 24 00 06 00 4260-99 P n2o CCGG 320.700 0.260 ... H6 2009 01 08 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265782 SPO 2008 09 01 04 14 00 2289-99 S n2o CCGG 320.630 0.260 ... H6 2009 01 08 11 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265783 SPO 2008 09 01 04 14 00 2290-99 S n2o CCGG 321.070 0.260 ... H6 2009 01 08 12 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265784 SPO 2008 09 01 05 10 00 1959-99 P n2o CCGG 320.780 0.260 ... H6 2009 01 08 11 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265779 SPO 2008 09 01 05 10 00 1960-99 P n2o CCGG 320.930 0.260 ... H6 2009 01 08 11 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265780 SPO 2008 09 08 01 11 00 3663-99 P n2o CCGG 320.590 0.260 ... H6 2009 01 09 13 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265791 SPO 2008 09 08 01 11 00 3664-99 P n2o CCGG 320.610 0.260 ... H6 2009 01 09 13 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265792 SPO 2008 09 16 12 15 00 1336-99 P n2o CCGG 320.360 0.260 ... H6 2009 01 08 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265770 SPO 2008 09 16 12 15 00 4555-99 P n2o CCGG 320.640 0.260 ... H6 2009 01 08 14 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265769 SPO 2008 09 16 22 13 00 1929-99 S n2o CCGG 320.740 0.260 ... H6 2009 01 09 10 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265789 SPO 2008 09 16 22 13 00 1930-99 S n2o CCGG 320.650 0.260 ... H6 2009 01 09 10 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265790 SPO 2008 09 24 02 12 00 4523-99 P n2o CCGG 321.160 0.260 ... H6 2009 01 08 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265767 SPO 2008 09 24 02 12 00 4524-99 P n2o CCGG 320.800 0.260 ... H6 2009 01 08 14 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265768 SPO 2008 10 01 00 12 00 3479-99 P n2o CCGG 319.710 0.260 A.. H6 2009 01 07 13 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265777 SPO 2008 10 01 00 12 00 3480-99 P n2o CCGG 320.930 0.260 ... H6 2009 01 07 14 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265778 SPO 2008 10 01 00 18 00 469-99 S n2o CCGG 320.900 0.260 ... H6 2009 01 06 13 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265725 SPO 2008 10 01 00 18 00 470-99 S n2o CCGG 320.710 0.260 ... H6 2009 01 06 13 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265726 SPO 2008 10 08 00 12 00 4169-99 P n2o CCGG 320.940 0.260 ... H6 2009 01 08 13 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265765 SPO 2008 10 08 00 12 00 4170-99 P n2o CCGG 320.710 0.260 ... H6 2009 01 08 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265766 SPO 2008 10 16 00 12 00 71-99 P n2o CCGG 321.080 0.260 ... H6 2009 01 08 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265763 SPO 2008 10 16 00 12 00 72-99 P n2o CCGG 321.170 0.260 ... H6 2009 01 08 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265764 SPO 2008 10 16 01 12 00 3143-99 S n2o CCGG 320.980 0.260 ... H6 2009 01 07 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265774 SPO 2008 10 16 01 12 00 3144-99 S n2o CCGG 320.350 0.260 ... H6 2009 01 07 12 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265773 SPO 2008 10 24 00 09 00 1905-99 P n2o CCGG 320.600 0.260 ... H6 2009 01 07 11 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265775 SPO 2008 10 24 00 09 00 1906-99 P n2o CCGG 320.710 0.260 ... H6 2009 01 07 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265776 SPO 2008 11 01 00 14 00 4385-99 P n2o CCGG 320.980 0.260 ... H6 2009 01 07 10 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265696 SPO 2008 11 01 00 14 00 4386-99 P n2o CCGG 320.000 0.260 ... H6 2009 01 07 11 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 265697 SPO 2008 11 01 00 19 00 1333-99 S n2o CCGG 321.130 0.260 ... H6 2009 01 09 11 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265787 SPO 2008 11 01 00 19 00 1334-99 S n2o CCGG 321.040 0.260 ... H6 2009 01 09 11 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 265788 SPO 2008 11 08 02 12 00 2019-99 P n2o CCGG 321.360 0.260 ... H6 2009 02 13 12 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269090 SPO 2008 11 08 02 12 00 2020-99 P n2o CCGG 321.450 0.260 ... H6 2009 02 13 12 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269091 SPO 2008 11 16 21 13 00 1353-99 P n2o CCGG 321.240 0.260 ... H6 2009 02 13 12 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269092 SPO 2008 11 16 21 13 00 1354-99 P n2o CCGG 321.480 0.260 ... H6 2009 02 13 12 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269093 SPO 2008 11 16 21 16 00 4029-99 S n2o CCGG 321.510 0.260 ... H6 2009 02 12 16 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 269088 SPO 2008 11 16 21 16 00 4030-99 S n2o CCGG 321.400 0.260 ... H6 2009 02 12 16 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 269089 SPO 2008 11 24 01 13 00 3193-99 P n2o CCGG 321.630 0.260 ... H6 2009 02 10 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269086 SPO 2008 11 24 01 13 00 3194-99 P n2o CCGG 321.520 0.260 ... H6 2009 02 10 13 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269087 SPO 2008 12 01 22 16 00 4011-99 P n2o CCGG 321.530 0.260 ... H6 2009 02 12 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269094 SPO 2008 12 01 22 16 00 4012-99 P n2o CCGG 321.600 0.260 ... H6 2009 02 12 16 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269095 SPO 2008 12 01 22 24 00 1415-99 S n2o CCGG 321.330 0.260 ... H6 2009 02 10 14 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 269080 SPO 2008 12 01 22 24 00 1416-99 S n2o CCGG 321.550 0.260 ... H6 2009 02 10 14 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 269081 SPO 2008 12 08 01 11 00 325-99 P n2o CCGG 321.680 0.260 ... H6 2009 02 10 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269084 SPO 2008 12 08 01 11 00 326-99 P n2o CCGG 321.670 0.260 ... H6 2009 02 10 14 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269085 SPO 2008 12 15 05 13 00 1305-99 P n2o CCGG 321.680 0.260 ... H6 2009 02 10 14 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269082 SPO 2008 12 15 05 13 00 1306-99 P n2o CCGG 321.470 0.260 ... H6 2009 02 10 15 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 269083 SPO 2008 12 15 05 18 00 3519-99 S n2o CCGG 321.240 0.260 ... H6 2009 03 02 10 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270341 SPO 2008 12 15 05 18 00 3520-99 S n2o CCGG 321.720 0.260 ... H6 2009 03 02 10 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270342 SPO 2008 12 24 00 19 00 601-99 P n2o CCGG 321.910 0.260 ... H6 2009 03 02 11 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270343 SPO 2008 12 24 00 19 00 602-99 P n2o CCGG 321.680 0.260 ... H6 2009 03 02 11 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270344 SPO 2009 01 01 05 12 00 4507-99 P n2o CCGG 321.600 0.260 ... H6 2009 02 26 15 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270333 SPO 2009 01 01 05 12 00 4508-99 P n2o CCGG 321.350 0.260 ... H6 2009 02 26 15 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270334 SPO 2009 01 01 05 17 00 2935-99 S n2o CCGG 321.510 0.260 ... H6 2009 02 26 15 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270335 SPO 2009 01 01 05 17 00 2936-99 S n2o CCGG 321.430 0.260 ... H6 2009 02 26 15 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270336 SPO 2009 01 09 03 15 00 2085-99 P n2o CCGG 321.470 0.260 ... H6 2009 03 02 11 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270339 SPO 2009 01 09 03 15 00 2086-99 P n2o CCGG 321.630 0.260 ... H6 2009 03 02 11 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270340 SPO 2009 01 17 05 17 00 1499-99 P n2o CCGG 321.220 0.260 ... H6 2009 02 26 14 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270331 SPO 2009 01 17 05 17 00 1500-99 P n2o CCGG 321.470 0.260 ... H6 2009 02 26 14 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270332 SPO 2009 01 17 05 26 00 3503-99 S n2o CCGG 321.620 0.260 ... H6 2009 02 26 16 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270337 SPO 2009 01 17 05 26 00 3504-99 S n2o CCGG 321.300 0.260 ... H6 2009 02 26 16 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 270338 SPO 2009 01 25 00 06 00 381-99 P n2o CCGG 321.380 0.260 ... H6 2009 02 26 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270329 SPO 2009 01 25 00 06 00 382-99 P n2o CCGG 321.450 0.260 ... H6 2009 02 26 14 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 270330 SPO 2009 02 03 04 17 00 1729-99 P n2o CCGG 321.520 0.260 ... H6 2009 12 21 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288003 SPO 2009 02 03 04 17 00 1730-99 P n2o CCGG 321.270 0.260 ... H6 2009 12 21 13 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288004 SPO 2009 02 03 04 22 00 3045-99 S n2o CCGG 320.540 0.260 ... H6 2009 12 21 14 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 287999 SPO 2009 02 03 04 22 00 3046-99 S n2o CCGG 321.180 0.260 ... H6 2009 12 21 14 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288000 SPO 2009 02 08 21 15 00 1315-99 P n2o CCGG 321.390 0.260 ... H6 2009 12 21 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288005 SPO 2009 02 08 21 15 00 1316-99 P n2o CCGG 320.730 0.260 ... H6 2009 12 21 13 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288006 SPO 2009 02 16 21 16 00 2033-99 P n2o CCGG 320.930 0.260 ... H6 2009 12 29 11 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288009 SPO 2009 02 16 21 16 00 2034-99 P n2o CCGG 320.980 0.260 ... H6 2009 12 29 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288010 SPO 2009 02 16 21 21 00 5013-99 S n2o CCGG 320.520 0.260 ... H6 2009 12 28 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288007 SPO 2009 02 16 21 21 00 5014-99 S n2o CCGG 320.640 0.260 ... H6 2009 12 28 15 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288008 SPO 2009 02 24 22 21 00 3745-99 P n2o CCGG 320.990 0.260 ... H6 2009 12 28 15 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288011 SPO 2009 02 24 22 21 00 3746-99 P n2o CCGG 320.910 0.260 ... H6 2009 12 28 15 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288012 SPO 2009 03 01 22 14 00 1259-99 P n2o CCGG 321.200 0.260 ... H6 2009 12 18 12 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287993 SPO 2009 03 01 22 14 00 1260-99 P n2o CCGG 321.200 0.260 ... H6 2009 12 18 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287994 SPO 2009 03 01 22 22 00 2613-99 S n2o CCGG 320.800 0.260 ... H6 2009 12 21 15 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288001 SPO 2009 03 01 22 22 00 2614-99 S n2o CCGG 320.430 0.260 ... H6 2009 12 21 15 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288002 SPO 2009 03 09 22 14 00 987-99 P n2o CCGG 320.930 0.260 ... H6 2009 12 18 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287995 SPO 2009 03 09 22 14 00 988-99 P n2o CCGG 320.870 0.260 ... H6 2009 12 18 11 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287996 SPO 2009 03 15 22 15 00 3621-99 P n2o CCGG 321.340 0.260 ... H6 2009 12 18 10 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287997 SPO 2009 03 15 22 15 00 3622-99 P n2o CCGG 321.320 0.260 ... H6 2009 12 18 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287998 SPO 2009 03 15 22 21 00 1183-99 S n2o CCGG 321.140 0.260 ... H6 2009 12 18 11 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 287991 SPO 2009 03 15 22 21 00 1184-99 S n2o CCGG 320.970 0.260 ... H6 2009 12 18 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 287992 SPO 2009 03 24 02 17 00 2415-99 P n2o CCGG 320.440 0.260 ... H6 2009 12 22 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287985 SPO 2009 03 24 02 17 00 2416-99 P n2o CCGG 320.930 0.260 ... H6 2009 12 22 12 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287986 SPO 2009 04 02 02 17 00 4687-99 P n2o CCGG 320.880 0.260 ... H6 2009 12 22 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287987 SPO 2009 04 02 02 17 00 4688-99 P n2o CCGG 321.020 0.260 ... H6 2009 12 22 12 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287988 SPO 2009 04 02 02 21 00 2849-99 S n2o CCGG 320.200 0.260 ... H6 2009 12 22 11 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 287983 SPO 2009 04 02 02 21 00 2850-99 S n2o CCGG 320.790 0.260 ... H6 2009 12 22 11 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 287984 SPO 2009 04 08 05 16 00 903-99 P n2o CCGG 320.770 0.260 ... H6 2009 12 22 11 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287989 SPO 2009 04 08 05 16 00 904-99 P n2o CCGG 320.720 0.260 ... H6 2009 12 22 11 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 287990 SPO 2009 04 15 03 15 00 4129-99 P n2o CCGG 320.790 0.260 ... H6 2009 12 11 12 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288033 SPO 2009 04 15 03 15 00 4130-99 P n2o CCGG 321.140 0.260 ... H6 2009 12 11 13 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288034 SPO 2009 04 15 03 22 00 793-99 S n2o CCGG 321.040 0.260 ... H6 2009 12 11 12 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288031 SPO 2009 04 15 03 22 00 794-99 S n2o CCGG 321.070 0.260 ... H6 2009 12 11 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288032 SPO 2009 04 24 21 16 00 5025-99 P n2o CCGG 320.580 0.260 ... H6 2009 12 11 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288035 SPO 2009 04 24 21 16 00 5026-99 P n2o CCGG 320.610 0.260 ... H6 2009 12 11 12 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288036 SPO 2009 05 01 03 23 00 595-99 P n2o CCGG 320.580 0.260 ... H6 2009 12 11 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288037 SPO 2009 05 01 03 23 00 596-99 P n2o CCGG 320.910 0.260 ... H6 2009 12 11 11 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288038 SPO 2009 05 01 03 30 00 1383-99 S n2o CCGG 320.730 0.260 ... H6 2009 12 17 15 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288041 SPO 2009 05 01 03 30 00 1384-99 S n2o CCGG 320.830 0.260 ... H6 2009 12 17 16 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288042 SPO 2009 05 08 10 38 00 2637-99 P n2o CCGG 320.910 0.260 ... H6 2009 12 17 15 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288045 SPO 2009 05 08 10 38 00 2638-99 P n2o CCGG 321.210 0.260 ... H6 2009 12 17 15 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288046 SPO 2009 05 16 00 30 00 645-99 P n2o CCGG 321.300 0.260 ... H6 2009 12 17 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288043 SPO 2009 05 16 00 30 00 646-99 P n2o CCGG 321.070 0.260 ... H6 2009 12 17 14 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288044 SPO 2009 05 16 00 35 00 3133-99 S n2o CCGG 321.250 0.260 ... H6 2009 12 17 14 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288039 SPO 2009 05 16 00 35 00 3134-99 S n2o CCGG 320.770 0.260 ... H6 2009 12 17 14 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288040 SPO 2009 05 25 00 15 00 4923-99 P n2o CCGG 321.220 0.260 ... H6 2009 12 09 14 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288017 SPO 2009 05 25 00 15 00 4924-99 P n2o CCGG 320.920 0.260 ... H6 2009 12 09 14 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288018 SPO 2009 06 01 00 25 00 773-99 P n2o CCGG 320.920 0.260 ... H6 2009 12 09 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288019 SPO 2009 06 01 00 25 00 774-99 P n2o CCGG 320.770 0.260 ... H6 2009 12 09 14 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288020 SPO 2009 06 01 00 30 00 651-99 S n2o CCGG 321.490 0.260 ... H6 2009 12 09 13 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288015 SPO 2009 06 01 00 30 00 652-99 S n2o CCGG 320.750 0.260 ... H6 2009 12 09 13 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288016 SPO 2009 06 08 13 19 00 2325-99 P n2o CCGG 321.320 0.260 ... H6 2009 12 09 13 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288021 SPO 2009 06 08 13 19 00 2326-99 P n2o CCGG 321.640 0.260 ... H6 2009 12 09 13 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288022 SPO 2009 06 15 23 15 00 3459-99 P n2o CCGG 320.980 0.260 ... H6 2009 12 10 14 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288025 SPO 2009 06 15 23 15 00 3460-99 P n2o CCGG 321.320 0.260 ... H6 2009 12 10 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288026 SPO 2009 06 15 23 21 00 29-99 S n2o CCGG 321.020 0.260 ... H6 2009 12 10 14 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288023 SPO 2009 06 15 23 21 00 30-99 S n2o CCGG 320.900 0.260 ... H6 2009 12 10 15 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288024 SPO 2009 06 24 00 35 00 2075-99 P n2o CCGG 320.990 0.260 ... H6 2009 12 10 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288027 SPO 2009 06 24 00 35 00 2076-99 P n2o CCGG 321.110 0.260 ... H6 2009 12 10 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288028 SPO 2009 07 02 13 16 00 5019-99 P n2o CCGG 321.000 0.260 ... H6 2009 12 10 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288029 SPO 2009 07 02 13 16 00 5020-99 P n2o CCGG 320.990 0.260 ... H6 2009 12 10 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288030 SPO 2009 07 02 13 22 00 4407-99 S n2o CCGG 321.190 0.260 ... H6 2009 12 14 15 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288088 SPO 2009 07 02 13 22 00 4408-99 S n2o CCGG 321.030 0.260 ... H6 2009 12 14 15 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288089 SPO 2009 07 08 02 28 00 4137-99 P n2o CCGG 321.400 0.260 ... H6 2009 12 14 15 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288092 SPO 2009 07 08 02 28 00 4138-99 P n2o CCGG 321.470 0.260 ... H6 2009 12 14 15 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288093 SPO 2009 07 15 03 29 00 1861-99 P n2o CCGG 320.740 0.260 ... H6 2009 12 28 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288083 SPO 2009 07 15 03 29 00 1862-99 P n2o CCGG 320.550 0.260 ... H6 2009 12 28 13 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288084 SPO 2009 07 15 03 34 00 3443-99 S n2o CCGG 319.660 0.260 A.. H6 2009 12 28 11 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288079 SPO 2009 07 15 03 34 00 3444-99 S n2o CCGG 320.820 0.260 ... H6 2009 12 28 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288080 SPO 2009 07 24 01 18 00 2495-99 P n2o CCGG 321.220 0.260 ... H6 2009 12 14 14 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288090 SPO 2009 07 24 01 18 00 2496-99 P n2o CCGG 321.400 0.260 ... H6 2009 12 14 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288091 SPO 2009 08 03 02 19 00 3605-99 P n2o CCGG 321.050 0.260 ... H6 2009 12 28 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288081 SPO 2009 08 03 02 19 00 3606-99 P n2o CCGG 321.150 0.260 ... H6 2009 12 28 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288082 SPO 2009 08 03 02 23 00 3489-99 S n2o CCGG 321.300 0.260 ... H6 2009 12 14 14 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288086 SPO 2009 08 03 02 23 00 3490-99 S n2o CCGG 321.400 0.260 ... H6 2009 12 14 14 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288087 SPO 2009 08 08 03 15 00 5045-99 P n2o CCGG 321.360 0.260 ... H6 2009 12 22 13 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288085 SPO 2009 08 15 02 20 00 3885-99 P n2o CCGG 321.450 0.260 ... H6 2009 12 15 13 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288075 SPO 2009 08 15 02 20 00 3886-99 P n2o CCGG 321.580 0.260 ... H6 2009 12 15 13 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288076 SPO 2009 08 15 02 23 00 2169-99 S n2o CCGG 321.500 0.260 ... H6 2009 12 15 12 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288071 SPO 2009 08 15 02 23 00 2170-99 S n2o CCGG 321.370 0.260 ... H6 2009 12 15 12 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288072 SPO 2009 08 24 23 22 00 105-99 P n2o CCGG 321.530 0.260 ... H6 2009 12 12 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288065 SPO 2009 08 24 23 22 00 106-99 P n2o CCGG 321.730 0.260 ... H6 2009 12 12 13 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288066 SPO 2009 09 01 12 15 00 3727-99 P n2o CCGG 321.460 0.260 ... H6 2009 12 12 12 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288069 SPO 2009 09 01 12 15 00 3728-99 P n2o CCGG 321.360 0.260 ... H6 2009 12 12 12 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288070 SPO 2009 09 01 12 19 00 819-99 S n2o CCGG 321.410 0.260 ... H6 2009 12 15 12 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288073 SPO 2009 09 01 12 19 00 820-99 S n2o CCGG 321.830 0.260 ... H6 2009 12 15 12 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288074 SPO 2009 09 08 02 19 00 3135-99 P n2o CCGG 321.820 0.260 ... H6 2009 12 15 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288077 SPO 2009 09 08 02 19 00 3136-99 P n2o CCGG 321.610 0.260 ... H6 2009 12 15 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288078 SPO 2009 09 15 01 18 00 2359-99 P n2o CCGG 321.580 0.260 ... H6 2009 12 12 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288067 SPO 2009 09 15 01 18 00 2360-99 P n2o CCGG 321.560 0.260 ... H6 2009 12 12 14 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288068 SPO 2009 09 15 01 27 00 215-99 S n2o CCGG 321.920 0.260 ... H6 2009 12 12 13 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288063 SPO 2009 09 15 01 27 00 216-99 S n2o CCGG 321.320 0.260 ... H6 2009 12 12 13 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288064 SPO 2009 09 24 01 30 00 4381-99 P n2o CCGG 321.500 0.260 ... H6 2009 12 16 13 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288049 SPO 2009 09 24 01 30 00 4382-99 P n2o CCGG 321.770 0.260 ... H6 2009 12 16 13 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288050 SPO 2009 10 01 22 17 00 3687-99 P n2o CCGG 321.780 0.260 ... H6 2009 12 16 11 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288053 SPO 2009 10 01 22 17 00 3688-99 P n2o CCGG 321.770 0.260 ... H6 2009 12 16 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288054 SPO 2009 10 01 22 25 00 2123-99 S n2o CCGG 321.270 0.260 ... H6 2009 12 23 11 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288055 SPO 2009 10 01 22 25 00 2124-99 S n2o CCGG 321.820 0.260 ... H6 2009 12 23 12 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288056 SPO 2009 10 08 01 23 00 3255-99 P n2o CCGG 321.620 0.260 ... H6 2009 12 23 10 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288061 SPO 2009 10 08 01 23 00 3256-99 P n2o CCGG 321.830 0.260 ... H6 2009 12 23 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288062 SPO 2009 10 15 21 22 00 357-99 P n2o CCGG 321.760 0.260 ... H6 2009 12 16 12 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288051 SPO 2009 10 15 21 22 00 358-99 P n2o CCGG 321.930 0.260 ... H6 2009 12 16 13 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288052 SPO 2009 10 15 21 32 00 2501-99 S n2o CCGG 322.000 0.260 ... H6 2009 12 16 12 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288047 SPO 2009 10 15 21 32 00 2502-99 S n2o CCGG 322.120 0.260 ... H6 2009 12 16 12 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288048 SPO 2009 10 24 01 25 00 1927-99 P n2o CCGG 321.890 0.260 ... H6 2009 12 23 11 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288059 SPO 2009 10 24 01 25 00 1928-99 P n2o CCGG 322.040 0.260 ... H6 2009 12 23 11 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 288060 SPO 2009 11 01 03 15 00 2713-99 P n2o CCGG 321.480 0.260 ... H6 2010 02 19 15 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290309 SPO 2009 11 01 03 15 00 2714-99 P n2o CCGG 321.320 0.260 ... H6 2010 02 19 15 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290310 SPO 2009 11 01 03 18 00 989-99 S n2o CCGG 321.980 0.260 ... H6 2009 12 23 10 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288057 SPO 2009 11 01 03 18 00 990-99 S n2o CCGG 321.810 0.260 ... H6 2009 12 23 11 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 288058 SPO 2009 11 08 22 18 00 939-99 P n2o CCGG 321.370 0.260 ... H6 2010 02 19 15 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290307 SPO 2009 11 08 22 18 00 940-99 P n2o CCGG 321.900 0.260 ... H6 2010 02 19 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290308 SPO 2009 11 09 01 55 00 3339-99 P n2o CCGG 321.470 0.260 ... H6 2010 02 19 14 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290305 SPO 2009 11 09 01 55 00 3340-99 P n2o CCGG 321.760 0.260 ... H6 2010 02 19 14 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290306 SPO 2009 11 15 21 21 00 2863-99 S n2o CCGG 322.180 0.260 ... H6 2010 02 22 11 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 290303 SPO 2009 11 15 21 21 00 2864-99 S n2o CCGG 321.600 0.260 ... H6 2010 02 22 11 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 290304 SPO 2009 11 15 21 25 00 1461-99 P n2o CCGG 321.600 0.260 ... H6 2010 02 22 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290299 SPO 2009 11 15 21 25 00 1462-99 P n2o CCGG 322.130 0.260 ... H6 2010 02 22 11 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290300 SPO 2009 12 01 21 20 00 1231-99 P n2o CCGG 322.030 0.260 ... H6 2010 02 22 12 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290301 SPO 2009 12 01 21 20 00 1232-99 P n2o CCGG 322.410 0.260 ... H6 2010 02 22 12 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290302 SPO 2009 12 01 22 15 00 2161-99 S n2o CCGG 321.570 0.260 ... H6 2010 02 19 14 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 290311 SPO 2009 12 01 22 15 00 2162-99 S n2o CCGG 321.910 0.260 ... H6 2010 02 19 14 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 290312 SPO 2009 12 08 03 30 00 2001-99 P n2o CCGG 321.600 0.260 ... H6 2010 02 19 16 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290297 SPO 2009 12 08 03 30 00 2002-99 P n2o CCGG 322.040 0.260 ... H6 2010 02 19 16 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 290298 SPO 2009 12 15 23 07 00 2041-99 P n2o CCGG 321.670 0.260 ... H6 2010 03 11 13 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291591 SPO 2009 12 15 23 07 00 2042-99 P n2o CCGG 321.930 0.260 ... H6 2010 03 11 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291592 SPO 2009 12 15 23 13 00 4491-99 S n2o CCGG 321.630 0.260 ... H6 2010 03 11 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291589 SPO 2009 12 15 23 13 00 4492-99 S n2o CCGG 321.590 0.260 ... H6 2010 03 11 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291590 SPO 2009 12 24 00 28 00 1697-99 P n2o CCGG 321.570 0.260 ... H6 2010 03 11 12 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291593 SPO 2009 12 24 00 28 00 1698-99 P n2o CCGG 321.790 0.260 ... H6 2010 03 11 12 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291594 SPO 2010 01 02 03 13 00 705-99 S n2o CCGG 321.820 0.260 ... H6 2010 03 12 09 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291583 SPO 2010 01 02 03 13 00 706-99 S n2o CCGG 321.930 0.260 ... H6 2010 03 12 09 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291584 SPO 2010 01 02 03 17 00 2023-99 P n2o CCGG 321.990 0.260 ... H6 2010 03 11 12 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291595 SPO 2010 01 02 03 17 00 2024-99 P n2o CCGG 321.850 0.260 ... H6 2010 03 11 12 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291596 SPO 2010 01 08 03 22 00 4977-99 P n2o CCGG 321.990 0.260 ... H6 2010 03 11 17 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291585 SPO 2010 01 08 03 22 00 4978-99 P n2o CCGG 322.080 0.260 ... H6 2010 03 11 17 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291586 SPO 2010 01 15 01 15 00 3807-99 P n2o CCGG 321.860 0.260 ... H6 2010 03 11 16 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291587 SPO 2010 01 15 01 15 00 3808-99 P n2o CCGG 322.110 0.260 ... H6 2010 03 11 16 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 291588 SPO 2010 01 15 01 19 00 4543-99 S n2o CCGG 321.790 0.260 ... H6 2010 03 11 16 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291581 SPO 2010 01 15 01 19 00 4544-99 S n2o CCGG 321.980 0.260 ... H6 2010 03 11 16 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 291582 SPO 2010 01 24 03 22 00 3619-99 P n2o CCGG 322.250 0.260 ... H6 2011 01 20 10 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311150 SPO 2010 01 24 03 22 00 3620-99 P n2o CCGG 321.990 0.260 ... H6 2011 01 20 11 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311151 SPO 2010 02 01 04 18 00 3397-99 S n2o CCGG 321.570 0.260 ... H6 2011 01 20 10 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311148 SPO 2010 02 01 04 18 00 3398-99 S n2o CCGG 321.960 0.260 ... H6 2011 01 20 10 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311149 SPO 2010 02 01 04 21 00 3739-99 P n2o CCGG 322.130 0.260 ... H6 2011 01 20 09 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311146 SPO 2010 02 01 04 21 00 3740-99 P n2o CCGG 322.230 0.260 ... H6 2011 01 20 10 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311147 SPO 2010 02 08 01 52 00 2753-99 P n2o CCGG 322.370 0.260 ... H6 2011 01 19 16 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311144 SPO 2010 02 08 01 52 00 2754-99 P n2o CCGG 322.020 0.260 ... H6 2011 01 19 16 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311145 SPO 2010 02 15 03 15 00 3137-99 P n2o CCGG 321.900 0.260 ... H6 2011 01 25 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311140 SPO 2010 02 15 03 15 00 3138-99 P n2o CCGG 322.200 0.260 ... H6 2011 01 25 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311141 SPO 2010 02 15 03 21 00 301-99 S n2o CCGG 322.100 0.260 ... H6 2011 01 25 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311142 SPO 2010 02 15 03 21 00 302-99 S n2o CCGG 321.960 0.260 ... H6 2011 01 25 16 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311143 SPO 2010 02 25 05 34 00 4185-99 P n2o CCGG 322.110 0.260 ... H6 2011 01 25 13 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311138 SPO 2010 02 25 05 34 00 4186-99 P n2o CCGG 322.060 0.260 ... H6 2011 01 25 13 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311139 SPO 2010 03 01 01 14 00 3117-99 P n2o CCGG 321.720 0.260 ... H6 2011 01 25 12 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311136 SPO 2010 03 01 01 14 00 3118-99 P n2o CCGG 322.000 0.260 ... H6 2011 01 25 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311137 SPO 2010 03 01 01 37 00 3867-99 S n2o CCGG 321.710 0.260 ... H6 2011 01 26 14 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311190 SPO 2010 03 01 01 37 00 3868-99 S n2o CCGG 321.910 0.260 ... H6 2011 01 26 14 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311191 SPO 2010 03 09 09 34 00 4445-99 P n2o CCGG 322.090 0.260 ... H6 2011 01 26 12 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311184 SPO 2010 03 09 09 34 00 4446-99 P n2o CCGG 322.170 0.260 ... H6 2011 01 26 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311185 SPO 2010 03 15 11 16 00 2677-99 P n2o CCGG 321.980 0.260 ... H6 2011 01 26 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311186 SPO 2010 03 15 11 16 00 2678-99 P n2o CCGG 322.340 0.260 ... H6 2011 01 26 12 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311187 SPO 2010 03 15 11 22 00 851-99 S n2o CCGG 320.760 0.260 A.. H6 2011 01 24 14 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311182 SPO 2010 03 15 11 22 00 852-99 S n2o CCGG 321.980 0.260 ... H6 2011 01 24 14 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311183 SPO 2010 03 24 01 35 00 1517-99 P n2o CCGG 321.880 0.260 ... H6 2011 01 24 12 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311180 SPO 2010 03 24 01 35 00 1518-99 P n2o CCGG 321.950 0.260 ... H6 2011 01 24 12 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311181 SPO 2010 04 01 03 14 00 4095-99 P n2o CCGG 321.850 0.260 ... H6 2011 01 24 12 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311178 SPO 2010 04 01 03 14 00 4096-99 P n2o CCGG 321.690 0.260 ... H6 2011 01 24 12 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311179 SPO 2010 04 01 03 20 00 4601-99 S n2o CCGG 321.840 0.260 ... H6 2011 01 21 14 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311176 SPO 2010 04 01 03 20 00 4602-99 S n2o CCGG 321.680 0.260 ... H6 2011 01 21 15 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311177 SPO 2010 04 08 03 36 00 1623-99 P n2o CCGG 322.240 0.260 ... H6 2011 01 26 10 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311228 SPO 2010 04 08 03 36 00 1624-99 P n2o CCGG 321.860 0.260 ... H6 2011 01 26 10 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311229 SPO 2010 04 16 22 19 00 1911-99 P n2o CCGG 321.810 0.260 ... H6 2011 01 21 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311230 SPO 2010 04 16 22 19 00 1912-99 P n2o CCGG 322.050 0.260 ... H6 2011 01 21 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311231 SPO 2010 04 16 22 26 00 1661-99 S n2o CCGG 321.940 0.260 ... H6 2011 01 21 10 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311232 SPO 2010 04 16 22 26 00 1662-99 S n2o CCGG 322.040 0.260 ... H6 2011 01 21 10 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311233 SPO 2010 04 25 00 47 00 3387-99 P n2o CCGG 321.770 0.260 ... H6 2011 01 21 09 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311235 SPO 2010 04 25 00 47 00 3388-99 P n2o CCGG 321.870 0.260 ... H6 2011 01 21 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311234 SPO 2010 05 01 01 17 00 2649-99 P n2o CCGG 321.690 0.260 ... H6 2011 01 27 09 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311222 SPO 2010 05 01 01 17 00 2650-99 P n2o CCGG 321.880 0.260 ... H6 2011 01 27 09 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311223 SPO 2010 05 01 01 23 00 3441-99 S n2o CCGG 322.180 0.260 ... H6 2011 01 27 10 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311226 SPO 2010 05 01 01 23 00 3442-99 S n2o CCGG 321.880 0.260 ... H6 2011 01 27 10 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311227 SPO 2010 05 08 07 19 00 1757-99 P n2o CCGG 322.360 0.260 ... H6 2011 01 26 16 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311224 SPO 2010 05 08 07 19 00 1758-99 P n2o CCGG 321.800 0.260 ... H6 2011 01 26 17 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311225 SPO 2010 05 15 05 14 00 4645-99 P n2o CCGG 322.090 0.260 ... H6 2011 01 26 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311220 SPO 2010 05 15 05 14 00 4646-99 P n2o CCGG 321.890 0.260 ... H6 2011 01 26 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311221 SPO 2010 05 15 05 26 00 4735-99 S n2o CCGG 321.880 0.260 ... H6 2011 01 19 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311174 SPO 2010 05 15 05 26 00 4736-99 S n2o CCGG 321.940 0.260 ... H6 2011 01 19 15 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311175 SPO 2010 05 24 21 25 00 3761-99 P n2o CCGG 321.930 0.260 ... H6 2011 01 19 12 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311172 SPO 2010 05 24 21 25 00 3762-99 P n2o CCGG 322.060 0.260 ... H6 2011 01 19 12 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311173 SPO 2010 06 01 23 14 00 275-99 P n2o CCGG 322.380 0.260 N.. H6 2011 01 19 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311170 SPO 2010 06 01 23 14 00 276-99 P n2o CCGG 322.260 0.260 ... H6 2011 01 19 12 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311171 SPO 2010 06 01 23 20 00 2547-99 S n2o CCGG 322.110 0.260 ... H6 2011 01 19 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311168 SPO 2010 06 01 23 20 00 2548-99 S n2o CCGG 322.280 0.260 ... H6 2011 01 19 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311169 SPO 2010 06 08 03 42 00 2039-99 P n2o CCGG 322.240 0.260 ... H6 2011 01 25 11 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311166 SPO 2010 06 08 03 42 00 2040-99 P n2o CCGG 321.860 0.260 ... H6 2011 01 25 11 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311167 SPO 2010 06 15 03 13 00 2923-99 P n2o CCGG 322.400 0.260 ... H6 2011 01 25 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311164 SPO 2010 06 15 03 13 00 2924-99 P n2o CCGG 322.210 0.260 ... H6 2011 01 25 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311165 SPO 2010 06 15 03 19 00 3903-99 S n2o CCGG 322.160 0.260 ... H6 2011 01 24 17 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311162 SPO 2010 06 15 03 19 00 3904-99 S n2o CCGG 322.130 0.260 ... H6 2011 01 24 17 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311163 SPO 2010 06 24 02 56 00 2769-99 P n2o CCGG 322.140 0.260 ... H6 2011 01 24 14 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311160 SPO 2010 06 24 02 56 00 2770-99 P n2o CCGG 322.050 0.260 ... H6 2011 01 24 15 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311161 SPO 2010 07 02 02 19 00 573-99 P n2o CCGG 322.190 0.260 ... H6 2011 01 20 15 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311246 SPO 2010 07 02 02 19 00 574-99 P n2o CCGG 322.300 0.260 ... H6 2011 01 20 16 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311247 SPO 2010 07 02 02 23 00 4023-99 S n2o CCGG 321.980 0.260 ... H6 2011 01 20 16 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311244 SPO 2010 07 02 02 23 00 4024-99 S n2o CCGG 322.250 0.260 ... H6 2011 01 20 16 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311245 SPO 2010 07 08 22 15 00 4031-99 P n2o CCGG 321.710 0.260 ... H6 2011 01 14 15 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311242 SPO 2010 07 08 22 15 00 4032-99 P n2o CCGG 322.150 0.260 ... H6 2011 01 14 15 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311243 SPO 2010 07 15 02 11 00 2965-99 S n2o CCGG 322.220 0.260 ... H6 2011 01 14 13 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311236 SPO 2010 07 15 02 11 00 2966-99 S n2o CCGG 322.400 0.260 ... H6 2011 01 14 14 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311237 SPO 2010 07 15 02 13 00 2101-99 P n2o CCGG 322.520 0.260 ... H6 2011 01 21 13 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311250 SPO 2010 07 15 02 13 00 2102-99 P n2o CCGG 322.610 0.260 ... H6 2011 01 21 13 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311251 SPO 2010 07 24 03 41 00 3031-99 P n2o CCGG 322.620 0.260 ... H6 2011 01 21 12 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311248 SPO 2010 07 24 03 41 00 3032-99 P n2o CCGG 322.410 0.260 ... H6 2011 01 21 12 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311249 SPO 2010 08 01 23 13 00 4239-99 P n2o CCGG 322.420 0.260 ... H6 2011 01 14 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311240 SPO 2010 08 01 23 13 00 4240-99 P n2o CCGG 322.390 0.260 ... H6 2011 01 14 14 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311241 SPO 2010 08 01 23 17 00 211-99 S n2o CCGG 322.570 0.260 ... H6 2011 01 14 13 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311238 SPO 2010 08 01 23 17 00 212-99 S n2o CCGG 322.750 0.260 ... H6 2011 01 14 13 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311239 SPO 2010 08 08 23 16 00 4597-99 P n2o CCGG 322.470 0.260 ... H6 2011 01 27 14 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311212 SPO 2010 08 08 23 16 00 4598-99 P n2o CCGG 322.640 0.260 ... H6 2011 01 27 14 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311213 SPO 2010 08 15 23 17 00 2499-99 P n2o CCGG 322.840 0.260 ... H6 2011 01 27 13 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311214 SPO 2010 08 15 23 17 00 2500-99 P n2o CCGG 322.610 0.260 ... H6 2011 01 27 13 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311215 SPO 2010 08 15 23 21 00 1737-99 S n2o CCGG 322.600 0.260 ... H6 2011 01 27 12 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311216 SPO 2010 08 15 23 21 00 1738-99 S n2o CCGG 322.410 0.260 ... H6 2011 01 27 13 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311217 SPO 2010 08 24 02 07 00 2375-99 P n2o CCGG 322.900 0.260 ... H6 2011 01 27 12 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311218 SPO 2010 08 24 02 07 00 2376-99 P n2o CCGG 322.840 0.260 ... H6 2011 01 27 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311219 SPO 2010 09 01 04 14 00 959-99 P n2o CCGG 322.680 0.260 ... H6 2011 01 18 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311206 SPO 2010 09 01 04 14 00 960-99 P n2o CCGG 322.560 0.260 ... H6 2011 01 18 15 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311207 SPO 2010 09 01 04 19 00 4151-99 S n2o CCGG 322.690 0.260 ... H6 2011 01 18 16 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311204 SPO 2010 09 01 04 19 00 4152-99 S n2o CCGG 322.950 0.260 ... H6 2011 01 18 16 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311205 SPO 2010 09 08 04 58 00 367-99 P n2o CCGG 322.930 0.260 ... H6 2011 01 18 15 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311208 SPO 2010 09 08 04 58 00 368-99 P n2o CCGG 322.810 0.260 ... H6 2011 01 18 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311209 SPO 2010 09 15 02 12 00 5057-99 P n2o CCGG 323.060 0.260 ... H6 2011 01 18 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311210 SPO 2010 09 15 02 12 00 5058-99 P n2o CCGG 323.000 0.260 ... H6 2011 01 18 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311211 SPO 2010 09 15 02 17 00 4973-99 S n2o CCGG 323.420 0.260 N.. H6 2011 01 19 09 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311088 SPO 2010 09 15 02 17 00 4974-99 S n2o CCGG 322.580 0.260 ... H6 2011 01 19 09 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311089 SPO 2010 09 24 22 58 00 1873-99 P n2o CCGG 322.890 0.260 ... H6 2011 01 18 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311082 SPO 2010 09 24 22 58 00 1874-99 P n2o CCGG 322.790 0.260 ... H6 2011 01 18 11 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311083 SPO 2010 10 01 00 14 00 6119-66 P n2o CCGG 322.810 0.260 ... H6 2011 01 20 15 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311104 SPO 2010 10 01 00 14 00 6120-66 P n2o CCGG 322.470 0.260 ... H6 2011 01 20 15 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311105 SPO 2010 10 01 00 18 00 723-99 S n2o CCGG 322.470 0.260 ... H6 2011 01 20 14 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311102 SPO 2010 10 01 00 18 00 724-99 S n2o CCGG 322.770 0.260 ... H6 2011 01 20 14 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311103 SPO 2010 10 08 21 12 00 1839-99 P n2o CCGG 322.650 0.260 ... H6 2011 01 19 09 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311086 SPO 2010 10 08 21 12 00 1840-99 P n2o CCGG 323.050 0.260 ... H6 2011 01 19 09 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311087 SPO 2010 10 15 03 12 00 141-99 P n2o CCGG 323.040 0.260 ... H6 2011 01 20 14 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311100 SPO 2010 10 15 03 12 00 142-99 P n2o CCGG 322.610 0.260 ... H6 2011 01 20 15 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311101 SPO 2010 10 15 03 16 00 6217-66 S n2o CCGG 322.950 0.260 ... H6 2011 01 18 11 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311084 SPO 2010 10 15 03 16 00 6218-66 S n2o CCGG 322.460 0.260 ... H6 2011 01 18 12 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311085 SPO 2010 10 24 20 47 00 4985-99 P n2o CCGG 323.250 0.260 ... H6 2011 01 20 13 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311098 SPO 2010 10 24 20 47 00 4986-99 P n2o CCGG 322.900 0.260 ... H6 2011 01 20 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311099 SPO 2010 11 01 06 12 00 2333-99 P n2o CCGG 322.800 0.260 ... H6 2011 01 14 16 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311108 SPO 2010 11 01 06 12 00 2334-99 P n2o CCGG 323.130 0.260 ... H6 2011 01 14 16 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311109 SPO 2010 11 01 06 20 00 3415-99 S n2o CCGG 323.180 0.260 ... H6 2011 01 14 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311106 SPO 2010 11 01 06 20 00 3416-99 S n2o CCGG 323.090 0.260 ... H6 2011 01 14 15 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311107 SPO 2010 11 08 02 05 00 4417-99 P n2o CCGG 323.030 0.260 ... H6 2011 01 21 16 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311124 SPO 2010 11 08 02 05 00 4418-99 P n2o CCGG 322.920 0.260 ... H6 2011 01 21 16 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311125 SPO 2010 11 15 02 11 00 3537-99 P n2o CCGG 323.230 0.260 ... H6 2011 01 24 10 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311128 SPO 2010 11 15 02 11 00 3538-99 P n2o CCGG 323.110 0.260 ... H6 2011 01 24 10 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311129 SPO 2010 11 15 02 15 00 59-99 S n2o CCGG 322.990 0.260 ... H6 2011 01 21 15 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311122 SPO 2010 11 15 02 15 00 60-99 S n2o CCGG 323.330 0.260 ... H6 2011 01 21 16 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 311123 SPO 2010 11 24 00 37 00 4951-99 P n2o CCGG 323.060 0.260 ... H6 2011 01 18 10 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311112 SPO 2010 11 24 00 37 00 4952-99 P n2o CCGG 323.280 0.260 ... H6 2011 01 18 11 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311113 SPO 2010 12 01 21 09 00 3759-99 S n2o CCGG 323.230 0.260 ... H6 2011 02 22 15 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312769 SPO 2010 12 01 21 09 00 3760-99 S n2o CCGG 323.340 0.260 ... H6 2011 02 22 15 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312770 SPO 2010 12 01 21 13 00 4147-99 P n2o CCGG 323.170 0.260 ... H6 2011 01 14 16 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311110 SPO 2010 12 01 21 13 00 4148-99 P n2o CCGG 323.370 0.260 ... H6 2011 01 14 16 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 311111 SPO 2010 12 08 01 49 00 2785-99 P n2o CCGG 323.380 0.260 ... H6 2011 02 22 14 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312763 SPO 2010 12 08 01 49 00 2786-99 P n2o CCGG 323.500 0.260 ... H6 2011 02 22 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312764 SPO 2010 12 15 20 06 00 815-99 S n2o CCGG 323.440 0.260 ... H6 2011 02 22 14 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312767 SPO 2010 12 15 20 06 00 816-99 S n2o CCGG 323.340 0.260 ... H6 2011 02 22 15 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312768 SPO 2010 12 15 20 10 00 4999-99 P n2o CCGG 323.630 0.260 ... H6 2011 02 22 15 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312765 SPO 2010 12 15 20 10 00 5000-99 P n2o CCGG 323.370 0.260 ... H6 2011 02 22 16 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312766 SPO 2010 12 24 01 04 00 257-99 P n2o CCGG 323.460 0.260 ... H6 2011 02 22 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312755 SPO 2010 12 24 01 04 00 258-99 P n2o CCGG 323.510 0.260 ... H6 2011 02 22 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312756 SPO 2011 01 01 01 06 00 1167-99 S n2o CCGG 323.050 0.260 ... H6 2011 02 22 12 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312761 SPO 2011 01 01 01 06 00 1168-99 S n2o CCGG 323.360 0.260 ... H6 2011 02 22 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 312762 SPO 2011 01 01 01 10 00 2407-99 P n2o CCGG 323.440 0.260 ... H6 2011 02 22 13 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312759 SPO 2011 01 01 01 10 00 2408-99 P n2o CCGG 323.390 0.260 ... H6 2011 02 22 13 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312760 SPO 2011 01 08 01 45 00 4557-99 P n2o CCGG 323.360 0.260 ... H6 2011 02 22 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312757 SPO 2011 01 08 01 45 00 4558-99 P n2o CCGG 323.470 0.260 ... H6 2011 02 22 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 312758 SPO 2011 01 15 05 05 00 4821-99 S n2o CCGG 322.320 0.260 ... H6 2011 12 20 13 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328053 SPO 2011 01 15 05 05 00 4822-99 S n2o CCGG 322.680 0.260 ... H6 2011 12 20 14 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328054 SPO 2011 01 15 05 08 00 4819-99 P n2o CCGG 322.590 0.260 ... H6 2011 12 21 09 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328027 SPO 2011 01 15 05 08 00 4820-99 P n2o CCGG 322.630 0.260 ... H6 2011 12 21 09 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328028 SPO 2011 01 23 22 01 00 5257-99 P n2o CCGG 322.550 0.260 ... H4 2011 12 21 12 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328045 SPO 2011 01 23 22 01 00 5258-99 P n2o CCGG 322.630 0.260 ... H4 2011 12 21 12 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328046 SPO 2011 02 01 00 06 00 2915-99 S n2o CCGG 322.450 0.260 ... H6 2011 12 15 11 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328033 SPO 2011 02 01 00 06 00 2916-99 S n2o CCGG 322.330 0.260 ... H6 2011 12 15 11 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328034 SPO 2011 02 01 00 10 00 5263-99 P n2o CCGG 323.030 0.260 ... H4 2011 12 21 11 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328041 SPO 2011 02 01 00 10 00 5264-99 P n2o CCGG 323.200 0.260 ... H4 2011 12 21 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328042 SPO 2011 02 08 20 06 00 5259-99 P n2o CCGG 322.960 0.260 ... H4 2011 12 21 11 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328043 SPO 2011 02 08 20 06 00 5260-99 P n2o CCGG 322.590 0.260 ... H4 2011 12 21 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328044 SPO 2011 02 16 00 06 00 4221-99 S n2o CCGG 322.470 0.260 ... H6 2011 12 15 11 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328035 SPO 2011 02 16 00 06 00 4222-99 S n2o CCGG 322.150 0.260 ... H6 2011 12 15 11 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328036 SPO 2011 02 16 00 11 00 1075-99 P n2o CCGG 322.660 0.260 ... H6 2011 12 21 08 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328026 SPO 2011 02 16 00 11 00 1076-99 P n2o CCGG 322.980 0.260 ... H6 2011 12 21 08 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328025 SPO 2011 02 24 00 37 00 5031-99 P n2o CCGG 322.560 0.260 ... H6 2011 12 27 16 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328175 SPO 2011 02 24 00 37 00 5032-99 P n2o CCGG 322.580 0.260 ... H6 2011 12 27 16 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328176 SPO 2011 03 03 20 06 00 4443-99 S n2o CCGG 322.730 0.260 ... H6 2011 12 19 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328181 SPO 2011 03 03 20 06 00 4444-99 S n2o CCGG 323.170 0.260 ... H6 2011 12 19 13 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328182 SPO 2011 03 03 20 10 00 1255-99 P n2o CCGG 323.330 0.260 ... H4 2011 12 27 17 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328193 SPO 2011 03 03 20 10 00 1256-99 P n2o CCGG 322.190 0.260 ... H4 2011 12 27 17 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328194 SPO 2011 03 11 19 44 00 3135-99 P n2o CCGG 322.660 0.260 ... H4 2011 12 27 16 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328191 SPO 2011 03 11 19 44 00 3136-99 P n2o CCGG 322.740 0.260 ... H4 2011 12 27 16 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328192 SPO 2011 03 17 20 06 00 5181-99 S n2o CCGG 322.380 0.260 ... H6 2011 12 19 12 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328179 SPO 2011 03 17 20 06 00 5182-99 S n2o CCGG 322.390 0.260 ... H6 2011 12 19 12 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328180 SPO 2011 03 17 20 11 00 3885-99 P n2o CCGG 322.880 0.260 ... H4 2011 12 27 16 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328189 SPO 2011 03 17 20 11 00 3886-99 P n2o CCGG 322.710 0.260 ... H4 2011 12 27 16 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328190 SPO 2011 03 24 21 01 00 4047-99 P n2o CCGG 322.680 0.260 ... H6 2011 12 27 15 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328171 SPO 2011 03 24 21 01 00 4048-99 P n2o CCGG 322.570 0.260 ... H6 2011 12 27 15 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328172 SPO 2011 04 01 01 06 00 3121-99 S n2o CCGG 322.500 0.260 ... H6 2011 12 19 14 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328185 SPO 2011 04 01 01 06 00 3122-99 S n2o CCGG 322.610 0.260 ... H6 2011 12 19 14 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328186 SPO 2011 04 01 01 10 00 1539-99 P n2o CCGG 322.740 0.260 ... H6 2011 12 27 16 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328173 SPO 2011 04 01 01 10 00 1540-99 P n2o CCGG 322.640 0.260 ... H6 2011 12 27 16 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328174 SPO 2011 04 10 00 46 00 401-99 P n2o CCGG 322.460 0.260 ... H6 2011 12 28 16 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328167 SPO 2011 04 10 00 46 00 402-99 P n2o CCGG 322.750 0.260 ... H6 2011 12 28 16 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328168 SPO 2011 04 15 02 13 00 5007-99 P n2o CCGG 322.440 0.260 ... H6 2011 12 28 15 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328165 SPO 2011 04 15 02 13 00 5008-99 P n2o CCGG 322.730 0.260 ... H6 2011 12 28 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328166 SPO 2011 04 15 02 16 00 269-99 S n2o CCGG 322.570 0.260 ... H6 2011 12 19 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328183 SPO 2011 04 15 02 16 00 270-99 S n2o CCGG 322.340 0.260 ... H6 2011 12 19 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328184 SPO 2011 04 24 00 32 00 3661-99 P n2o CCGG 322.550 0.260 ... H6 2011 12 28 15 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328163 SPO 2011 04 24 00 32 00 3662-99 P n2o CCGG 322.020 0.260 ... H6 2011 12 28 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328164 SPO 2011 05 04 21 08 00 2219-99 S n2o CCGG 322.320 0.260 ... H6 2011 12 28 12 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328155 SPO 2011 05 04 21 08 00 2220-99 S n2o CCGG 322.390 0.260 ... H6 2011 12 28 12 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328156 SPO 2011 05 04 21 11 00 1207-99 P n2o CCGG 322.510 0.260 ... H6 2011 12 27 17 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328177 SPO 2011 05 04 21 11 00 1208-99 P n2o CCGG 322.830 0.260 ... H6 2011 12 27 17 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328178 SPO 2011 05 08 01 04 00 5179-99 P n2o CCGG 322.940 0.260 ... H6 2011 12 28 16 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328169 SPO 2011 05 08 01 04 00 5180-99 P n2o CCGG 322.560 0.260 ... H6 2011 12 28 17 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328170 SPO 2011 05 19 02 09 00 193-99 S n2o CCGG 322.390 0.260 ... H6 2011 12 29 12 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328207 SPO 2011 05 19 02 09 00 194-99 S n2o CCGG 322.580 0.260 ... H6 2011 12 29 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328208 SPO 2011 05 19 02 14 00 1821-99 P n2o CCGG 322.180 0.260 ... H6 2011 12 29 14 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328201 SPO 2011 05 19 02 14 00 1822-99 P n2o CCGG 322.580 0.260 ... H6 2011 12 29 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328202 SPO 2011 05 24 02 25 00 2501-99 P n2o CCGG 323.180 0.260 ... H6 2011 12 29 13 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328200 SPO 2011 05 24 02 25 00 2502-99 P n2o CCGG 322.660 0.260 ... H6 2011 12 29 14 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328199 SPO 2011 06 02 00 09 00 1143-99 S n2o CCGG 322.660 0.260 ... H6 2011 12 29 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328203 SPO 2011 06 02 00 09 00 1144-99 S n2o CCGG 322.540 0.260 ... H6 2011 12 29 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328204 SPO 2011 06 02 00 13 00 787-99 P n2o CCGG 321.920 0.260 ... H6 2011 12 29 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328195 SPO 2011 06 02 00 13 00 788-99 P n2o CCGG 322.460 0.260 ... H6 2011 12 29 13 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328196 SPO 2011 06 09 20 01 00 1683-99 P n2o CCGG 322.520 0.260 ... H6 2011 12 29 13 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328197 SPO 2011 06 09 20 01 00 1684-99 P n2o CCGG 322.450 0.260 ... H6 2011 12 29 13 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328198 SPO 2011 06 17 02 06 00 1555-99 S n2o CCGG 322.590 0.260 ... H6 2011 12 29 11 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328205 SPO 2011 06 17 02 06 00 1556-99 S n2o CCGG 322.990 0.260 ... H6 2011 12 29 12 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328206 SPO 2011 06 17 02 10 00 1375-99 P n2o CCGG 322.970 0.260 ... H4 2011 12 27 15 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328188 SPO 2011 06 17 02 10 00 1376-99 P n2o CCGG 322.690 0.260 ... H4 2011 12 27 15 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328187 SPO 2011 07 01 02 06 00 5165-99 S n2o CCGG 322.680 0.260 ... H6 2011 12 20 12 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328047 SPO 2011 07 01 02 06 00 5166-99 S n2o CCGG 322.530 0.260 ... H6 2011 12 20 12 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328048 SPO 2011 07 01 02 10 00 5251-99 P n2o CCGG 323.040 0.260 ... H4 2011 12 21 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328040 SPO 2011 07 01 02 10 00 5252-99 P n2o CCGG 322.800 0.260 ... H4 2011 12 21 10 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328039 SPO 2011 07 08 02 43 00 3671-99 P n2o CCGG 323.000 0.260 ... H6 2011 12 27 12 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328145 SPO 2011 07 08 02 43 00 3672-99 P n2o CCGG 322.600 0.260 ... H6 2011 12 27 13 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328146 SPO 2011 07 15 21 08 00 251-99 S n2o CCGG 323.040 0.260 ... H6 2011 12 20 12 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328049 SPO 2011 07 15 21 08 00 252-99 S n2o CCGG 322.820 0.260 ... H6 2011 12 20 13 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328050 SPO 2011 07 15 21 12 00 5081-99 P n2o CCGG 322.900 0.260 ... H6 2011 12 23 11 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328139 SPO 2011 07 15 21 12 00 5082-99 P n2o CCGG 322.690 0.260 ... H6 2011 12 23 11 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328140 SPO 2011 07 25 21 39 00 2941-99 P n2o CCGG 323.020 0.260 ... H6 2011 12 27 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328141 SPO 2011 07 25 21 39 00 2942-99 P n2o CCGG 322.900 0.260 ... H6 2011 12 27 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328142 SPO 2011 08 01 21 08 00 3803-99 S n2o CCGG 322.740 0.260 ... H6 2011 12 20 13 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328051 SPO 2011 08 01 21 08 00 3804-99 S n2o CCGG 323.010 0.260 ... H6 2011 12 20 13 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328052 SPO 2011 08 01 21 11 00 1417-99 P n2o CCGG 322.990 0.260 ... H6 2011 12 27 12 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328143 SPO 2011 08 01 21 11 00 1418-99 P n2o CCGG 322.860 0.260 ... H6 2011 12 27 12 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328144 SPO 2011 08 09 01 55 00 5265-99 P n2o CCGG 322.830 0.260 ... H6 2011 12 14 13 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328017 SPO 2011 08 09 01 55 00 5266-99 P n2o CCGG 323.080 0.260 ... H6 2011 12 14 13 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328018 SPO 2011 08 16 02 09 00 4585-99 S n2o CCGG 323.220 0.260 ... H6 2011 12 15 12 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328021 SPO 2011 08 16 02 09 00 4586-99 S n2o CCGG 323.320 0.260 ... H6 2011 12 15 13 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328022 SPO 2011 08 16 02 13 00 3125-99 P n2o CCGG 322.820 0.260 ... H6 2011 12 14 12 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328023 SPO 2011 08 16 02 13 00 3126-99 P n2o CCGG 322.940 0.260 ... H6 2011 12 14 12 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328024 SPO 2011 08 24 01 41 00 5255-99 P n2o CCGG 323.060 0.260 ... H6 2011 12 21 09 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328031 SPO 2011 08 24 01 41 00 5256-99 P n2o CCGG 322.840 0.260 ... H6 2011 12 21 09 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328032 SPO 2011 09 02 02 07 00 3797-99 S n2o CCGG 322.960 0.260 ... H6 2011 12 15 12 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328037 SPO 2011 09 02 02 07 00 3798-99 S n2o CCGG 323.350 0.260 ... H6 2011 12 15 12 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328038 SPO 2011 09 02 02 11 00 4801-99 P n2o CCGG 322.610 0.260 ... H6 2011 12 21 10 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328029 SPO 2011 09 02 02 11 00 4802-99 P n2o CCGG 323.100 0.260 ... H6 2011 12 21 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328030 SPO 2011 09 08 02 10 00 4123-99 P n2o CCGG 323.240 0.260 ... H6 2011 12 14 13 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328019 SPO 2011 09 08 02 10 00 4124-99 P n2o CCGG 322.960 0.260 ... H6 2011 12 14 13 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328020 SPO 2011 09 15 03 08 00 2633-99 S n2o CCGG 322.510 0.260 ... H6 2011 12 28 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328161 SPO 2011 09 15 03 08 00 2634-99 S n2o CCGG 323.210 0.260 ... H6 2011 12 28 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328162 SPO 2011 09 15 03 12 00 5253-99 P n2o CCGG 323.040 0.260 ... H6 2011 12 14 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328015 SPO 2011 09 15 03 12 00 5254-99 P n2o CCGG 323.280 0.260 ... H6 2011 12 14 14 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328016 SPO 2011 09 24 01 18 00 3657-99 P n2o CCGG 323.250 0.260 ... H6 2011 12 28 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328151 SPO 2011 09 24 01 18 00 3658-99 P n2o CCGG 323.190 0.260 ... H6 2011 12 28 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328152 SPO 2011 10 04 01 09 00 653-99 S n2o CCGG 323.140 0.260 ... H6 2011 12 28 10 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328157 SPO 2011 10 04 01 09 00 654-99 S n2o CCGG 323.410 0.260 ... H6 2011 12 28 11 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328158 SPO 2011 10 04 01 12 00 4921-99 P n2o CCGG 323.840 0.260 ... H6 2011 12 28 10 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328149 SPO 2011 10 04 01 12 00 4922-99 P n2o CCGG 322.930 0.260 ... H6 2011 12 28 10 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328150 SPO 2011 10 08 01 39 00 3941-99 P n2o CCGG 323.560 0.260 ... H6 2011 12 28 09 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328148 SPO 2011 10 08 01 39 00 3942-99 P n2o CCGG 323.250 0.260 ... H6 2011 12 28 10 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328147 SPO 2011 10 15 21 14 00 2591-99 P n2o CCGG 323.180 0.260 ... H6 2011 12 29 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328209 SPO 2011 10 15 21 14 00 2592-99 P n2o CCGG 323.420 0.260 ... H6 2011 12 29 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328210 SPO 2011 10 15 21 18 00 1087-99 S n2o CCGG 323.350 0.260 ... H6 2011 12 28 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328159 SPO 2011 10 15 21 18 00 1088-99 S n2o CCGG 323.720 0.260 ... H6 2011 12 28 13 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328160 SPO 2011 10 24 02 44 00 1703-99 P n2o CCGG 323.670 0.260 ... H6 2011 12 28 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328153 SPO 2011 10 24 02 44 00 1704-99 P n2o CCGG 323.810 0.260 ... H6 2011 12 28 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328154 SPO 2011 11 01 20 12 00 4695-99 S n2o CCGG 323.220 0.260 ... H6 2012 01 12 12 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328961 SPO 2011 11 01 20 12 00 4696-99 S n2o CCGG 323.670 0.260 ... H6 2012 01 12 12 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328962 SPO 2011 11 01 20 16 00 3401-99 P n2o CCGG 323.610 0.260 ... H6 2012 01 12 12 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328965 SPO 2011 11 01 20 16 00 3402-99 P n2o CCGG 323.510 0.260 ... H6 2012 01 12 12 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328966 SPO 2011 11 08 03 57 00 3453-99 P n2o CCGG 323.980 0.260 ... H4 2012 01 11 15 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328963 SPO 2011 11 08 03 57 00 3454-99 P n2o CCGG 323.750 0.260 ... H4 2012 01 11 16 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328964 SPO 2011 11 15 04 01 00 588-99 P n2o CCGG 323.640 0.260 ... H4 2012 01 10 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328974 SPO 2011 11 15 04 15 00 416-99 S n2o CCGG 323.770 0.260 ... H4 2012 01 10 14 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328971 SPO 2011 11 24 19 49 00 741-99 P n2o CCGG 323.530 0.260 ... H6 2012 01 11 14 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328959 SPO 2011 11 24 19 49 00 742-99 P n2o CCGG 323.440 0.260 ... H6 2012 01 11 15 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328960 SPO 2011 12 01 02 13 00 901-99 S n2o CCGG 323.490 0.260 ... H6 2012 01 10 15 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328969 SPO 2011 12 01 02 13 00 902-99 S n2o CCGG 323.610 0.260 ... H6 2012 01 10 15 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 328970 SPO 2011 12 01 02 29 00 3913-99 P n2o CCGG 323.920 0.260 ... H4 2012 01 10 15 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328972 SPO 2011 12 01 02 29 00 3914-99 P n2o CCGG 323.910 0.260 ... H4 2012 01 10 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 328973 SPO 2011 12 13 03 49 00 2462-99 P n2o CCGG 323.730 0.260 ... H4 2012 02 10 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331014 SPO 2011 12 13 03 49 00 952-99 P n2o CCGG 322.900 0.260 A.. H4 2012 02 10 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331013 SPO 2011 12 16 23 12 00 2525-99 S n2o CCGG 323.700 0.260 ... H4 2012 02 10 14 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331011 SPO 2011 12 16 23 12 00 4716-99 S n2o CCGG 323.740 0.260 ... H4 2012 02 10 14 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331012 SPO 2011 12 16 23 31 00 2035-99 P n2o CCGG 323.680 0.260 ... H4 2012 02 08 14 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331007 SPO 2011 12 16 23 31 00 2337-99 P n2o CCGG 323.900 0.260 ... H4 2012 02 08 14 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331008 SPO 2011 12 26 02 52 00 2940-99 P n2o CCGG 323.920 0.260 ... H4 2012 02 08 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331006 SPO 2011 12 26 02 52 00 3043-99 P n2o CCGG 324.290 0.260 ... H4 2012 02 08 14 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331005 SPO 2012 01 01 04 13 00 1633-99 S n2o CCGG 323.780 0.260 ... H4 2012 02 10 14 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331009 SPO 2012 01 01 04 13 00 3153-99 S n2o CCGG 323.850 0.260 ... H4 2012 02 10 14 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331010 SPO 2012 01 01 04 35 00 2852-99 P n2o CCGG 324.060 0.260 ... H4 2012 02 10 13 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331015 SPO 2012 01 01 04 35 00 4079-99 P n2o CCGG 323.650 0.260 ... H4 2012 02 10 13 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331016 SPO 2012 01 09 04 12 00 2857-99 P n2o CCGG 324.100 0.260 ... H4 2012 02 08 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331003 SPO 2012 01 09 04 12 00 6407-66 P n2o CCGG 324.220 0.260 ... H4 2012 02 08 13 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 331004 SPO 2012 01 15 09 10 00 33-99 S n2o CCGG 323.770 0.260 ... H4 2012 02 08 12 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331001 SPO 2012 01 15 09 10 00 34-99 S n2o CCGG 324.080 0.260 ... H4 2012 02 08 12 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 331002 SPO 2012 01 15 09 15 00 3975-99 P n2o CCGG 323.080 0.260 ... H6 2013 01 08 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346026 SPO 2012 01 15 09 15 00 4261-99 P n2o CCGG 323.590 0.260 ... H6 2013 01 08 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346027 SPO 2012 01 23 10 00 00 2241-99 P n2o CCGG 323.630 0.260 ... H6 2013 01 08 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346028 SPO 2012 01 23 10 00 00 2242-99 P n2o CCGG 323.840 0.260 ... H6 2013 01 08 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346029 SPO 2012 02 01 23 10 00 5249-99 S n2o CCGG 323.200 0.260 ... H6 2013 01 08 11 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346030 SPO 2012 02 01 23 10 00 5250-99 S n2o CCGG 323.230 0.260 ... H6 2013 01 08 11 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346031 SPO 2012 02 01 23 17 00 5243-99 P n2o CCGG 322.900 0.260 ... H6 2013 01 08 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346032 SPO 2012 02 01 23 17 00 5244-99 P n2o CCGG 323.030 0.260 ... H6 2013 01 08 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346033 SPO 2012 02 08 03 19 00 1203-99 P n2o CCGG 323.420 0.260 ... H6 2013 01 17 15 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346040 SPO 2012 02 08 03 19 00 1204-99 P n2o CCGG 323.720 0.260 ... H6 2013 01 17 16 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346041 SPO 2012 02 17 03 13 00 991-99 S n2o CCGG 323.390 0.260 ... H6 2013 01 17 15 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346038 SPO 2012 02 17 03 13 00 992-99 S n2o CCGG 323.620 0.260 ... H6 2013 01 17 15 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346039 SPO 2012 02 17 03 44 00 699-99 P n2o CCGG 323.760 0.260 ... H6 2013 01 09 14 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346036 SPO 2012 02 17 03 44 00 700-99 P n2o CCGG 323.460 0.260 ... H6 2013 01 09 14 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346037 SPO 2012 02 26 02 27 00 1557-99 P n2o CCGG 323.450 0.260 ... H6 2013 01 09 13 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346034 SPO 2012 02 26 02 27 00 1558-99 P n2o CCGG 323.600 0.260 ... H6 2013 01 09 13 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346035 SPO 2012 03 01 02 11 00 5245-99 S n2o CCGG 323.140 0.260 ... H6 2013 01 15 09 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345946 SPO 2012 03 01 02 11 00 5246-99 S n2o CCGG 323.110 0.260 ... H6 2013 01 15 10 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345947 SPO 2012 03 01 02 15 00 2687-99 P n2o CCGG 323.190 0.260 ... H6 2013 01 15 09 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345942 SPO 2012 03 01 02 15 00 2688-99 P n2o CCGG 323.400 0.260 ... H6 2013 01 15 09 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345943 SPO 2012 03 11 07 28 00 305-99 P n2o CCGG 323.460 0.260 ... H6 2013 01 16 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345952 SPO 2012 03 11 07 28 00 306-99 P n2o CCGG 323.260 0.260 ... H6 2013 01 16 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345953 SPO 2012 03 15 03 10 00 4007-99 S n2o CCGG 323.390 0.260 ... H6 2013 01 16 14 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345950 SPO 2012 03 15 03 10 00 4008-99 S n2o CCGG 323.350 0.260 ... H6 2013 01 16 14 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345951 SPO 2012 03 15 03 16 00 3773-99 P n2o CCGG 323.740 0.260 ... H6 2013 01 16 11 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345936 SPO 2012 03 15 03 16 00 3774-99 P n2o CCGG 323.320 0.260 ... H6 2013 01 16 11 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345937 SPO 2012 03 24 01 12 00 577-99 P n2o CCGG 323.550 0.260 ... H6 2013 01 15 16 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345934 SPO 2012 03 24 01 12 00 578-99 P n2o CCGG 323.550 0.260 ... H6 2013 01 15 16 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345935 SPO 2012 03 24 01 24 00 352-99 P n2o CCGG 323.090 0.260 ... H4 2013 01 08 14 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346018 SPO 2012 03 24 01 24 00 4750-99 P n2o CCGG 323.470 0.260 ... H4 2013 01 08 14 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346019 SPO 2012 04 01 23 12 00 343-99 S n2o CCGG 323.280 0.260 ... H6 2013 01 15 10 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345948 SPO 2012 04 01 23 12 00 344-99 S n2o CCGG 323.290 0.260 ... H6 2013 01 15 10 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345949 SPO 2012 04 01 23 19 00 29-99 P n2o CCGG 323.230 0.260 ... H6 2013 01 24 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345944 SPO 2012 04 10 02 31 00 1534-99 P n2o CCGG 323.630 0.260 ... H4 2013 01 08 16 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346025 SPO 2012 04 10 02 31 00 4605-99 P n2o CCGG 323.800 0.260 ... H4 2013 01 08 16 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346024 SPO 2012 04 15 23 10 00 3123-99 S n2o CCGG 323.700 0.260 ... H4 2013 01 08 15 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346022 SPO 2012 04 15 23 10 00 3822-99 S n2o CCGG 323.850 0.260 ... H4 2013 01 08 15 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346023 SPO 2012 04 15 23 16 00 1785-99 P n2o CCGG 323.920 0.260 ... H4 2013 01 08 15 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346020 SPO 2012 04 15 23 16 00 2070-99 P n2o CCGG 323.220 0.260 ... H4 2013 01 08 15 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346021 SPO 2012 05 01 04 10 00 169-99 S n2o CCGG 323.230 0.260 ... H6 2013 01 22 16 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346016 SPO 2012 05 01 04 10 00 4100-99 S n2o CCGG 323.680 0.260 ... H6 2013 01 22 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346017 SPO 2012 05 01 04 17 00 287-99 P n2o CCGG 323.230 0.260 ... H6 2013 01 22 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346015 SPO 2012 05 01 04 17 00 4697-99 P n2o CCGG 323.130 0.260 ... H6 2013 01 22 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346014 SPO 2012 05 08 04 16 00 2425-99 P n2o CCGG 323.100 0.260 ... H6 2013 01 22 14 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346012 SPO 2012 05 08 04 16 00 4552-99 P n2o CCGG 323.380 0.260 ... H6 2013 01 22 15 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346013 SPO 2012 05 15 18 10 00 1712-99 S n2o CCGG 323.410 0.260 ... H6 2013 01 22 14 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346010 SPO 2012 05 15 18 10 00 4270-99 S n2o CCGG 323.390 0.260 ... H6 2013 01 22 14 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346011 SPO 2012 05 15 18 14 00 803-99 P n2o CCGG 323.430 0.260 ... H6 2013 01 14 11 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345906 SPO 2012 05 15 18 14 00 804-99 P n2o CCGG 323.640 0.260 ... H6 2013 01 14 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345907 SPO 2012 05 26 00 28 00 369-99 P n2o CCGG 323.950 0.260 N.. H6 2013 01 14 11 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345908 SPO 2012 05 26 00 28 00 370-99 P n2o CCGG 323.620 0.260 ... H6 2013 01 14 11 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345909 SPO 2012 06 01 03 10 00 2389-99 S n2o CCGG 323.540 0.260 ... H6 2013 01 10 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345916 SPO 2012 06 01 03 10 00 2390-99 S n2o CCGG 323.250 0.260 ... H6 2013 01 10 16 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345917 SPO 2012 06 01 03 15 00 393-99 P n2o CCGG 323.290 0.260 ... H6 2013 01 10 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345914 SPO 2012 06 01 03 15 00 394-99 P n2o CCGG 323.400 0.260 ... H6 2013 01 10 15 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345915 SPO 2012 06 08 03 12 00 2667-99 P n2o CCGG 323.220 0.260 ... H6 2013 01 10 14 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345912 SPO 2012 06 08 03 12 00 2668-99 P n2o CCGG 323.550 0.260 ... H6 2013 01 10 15 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345913 SPO 2012 06 15 13 10 00 1801-99 S n2o CCGG 323.650 0.260 ... H6 2013 01 10 14 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345910 SPO 2012 06 15 13 10 00 1802-99 S n2o CCGG 323.390 0.260 ... H6 2013 01 10 14 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345911 SPO 2012 06 15 13 15 00 3299-99 P n2o CCGG 323.920 0.260 ... H4 2013 01 08 12 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345922 SPO 2012 06 15 13 15 00 3300-99 P n2o CCGG 323.930 0.260 ... H4 2013 01 08 12 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345923 SPO 2012 06 24 03 37 00 1367-99 P n2o CCGG 324.070 0.260 ... H4 2013 01 08 11 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345924 SPO 2012 06 24 03 37 00 1368-99 P n2o CCGG 323.970 0.260 ... H4 2013 01 08 11 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345925 SPO 2012 07 01 01 11 00 1094-99 S n2o CCGG 323.600 0.260 ... H6 2013 01 17 11 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346050 SPO 2012 07 01 01 11 00 4487-99 S n2o CCGG 323.660 0.260 ... H6 2013 01 17 12 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346051 SPO 2012 07 01 01 15 00 3019-99 P n2o CCGG 323.480 0.260 ... H6 2013 01 17 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346048 SPO 2012 07 01 01 15 00 3637-99 P n2o CCGG 323.710 0.260 ... H6 2013 01 17 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346049 SPO 2012 07 08 13 17 00 1696-99 P n2o CCGG 323.290 0.260 ... H6 2013 01 17 10 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346046 SPO 2012 07 08 13 17 00 1939-99 P n2o CCGG 323.730 0.260 ... H6 2013 01 17 11 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346047 SPO 2012 07 15 02 10 00 3674-99 S n2o CCGG 323.910 0.260 ... H6 2013 01 17 10 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346045 SPO 2012 07 15 02 10 00 509-99 S n2o CCGG 323.940 0.260 ... H6 2013 01 17 10 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346044 SPO 2012 07 15 02 14 00 1923-99 P n2o CCGG 323.800 0.260 ... H6 2013 01 08 17 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346058 SPO 2012 07 15 02 14 00 707-99 P n2o CCGG 323.830 0.260 ... H6 2013 01 08 16 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346059 SPO 2012 07 24 00 13 00 1089-99 P n2o CCGG 323.880 0.260 ... H6 2013 01 09 12 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346057 SPO 2012 07 24 00 13 00 25-99 P n2o CCGG 323.820 0.260 ... H6 2013 01 09 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346056 SPO 2012 08 01 02 10 00 1011-99 S n2o CCGG 323.880 0.260 ... H6 2013 01 09 11 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346055 SPO 2012 08 01 02 10 00 746-99 S n2o CCGG 323.960 0.260 ... H6 2013 01 09 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346054 SPO 2012 08 01 02 14 00 3673-99 P n2o CCGG 323.820 0.260 ... H6 2013 01 08 16 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346052 SPO 2012 08 01 02 14 00 3934-99 P n2o CCGG 324.080 0.260 ... H6 2013 01 08 16 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346053 SPO 2012 08 08 04 46 00 5035-99 P n2o CCGG 324.440 0.260 ... H4 2013 01 04 14 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345932 SPO 2012 08 08 04 46 00 5036-99 P n2o CCGG 324.200 0.260 ... H4 2013 01 04 14 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345933 SPO 2012 08 15 18 10 00 2495-99 S n2o CCGG 324.350 0.260 ... H4 2013 01 04 13 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345930 SPO 2012 08 15 18 10 00 2496-99 S n2o CCGG 324.310 0.260 ... H4 2013 01 04 13 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345931 SPO 2012 08 15 18 15 00 723-99 P n2o CCGG 324.080 0.260 ... H6 2013 01 16 12 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345938 SPO 2012 08 15 18 15 00 724-99 P n2o CCGG 324.120 0.260 ... H6 2013 01 16 12 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345939 SPO 2012 08 24 00 13 00 4273-99 P n2o CCGG 324.090 0.260 ... H6 2013 01 16 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345940 SPO 2012 08 24 00 13 00 4274-99 P n2o CCGG 324.220 0.260 ... H6 2013 01 16 12 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345941 SPO 2012 09 01 17 08 00 2237-99 S n2o CCGG 324.530 0.260 ... H4 2013 01 08 11 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345920 SPO 2012 09 01 17 08 00 2238-99 S n2o CCGG 324.500 0.260 ... H4 2013 01 08 11 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345921 SPO 2012 09 01 17 13 00 2039-99 P n2o CCGG 324.670 0.260 ... H4 2013 01 08 10 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345918 SPO 2012 09 01 17 13 00 2040-99 P n2o CCGG 324.350 0.260 ... H4 2013 01 08 10 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345919 SPO 2012 09 08 10 15 00 4601-99 P n2o CCGG 324.310 0.260 ... H4 2013 01 08 10 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345926 SPO 2012 09 08 10 15 00 4602-99 P n2o CCGG 324.430 0.260 ... H4 2013 01 08 10 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345927 SPO 2012 09 15 01 10 00 833-99 S n2o CCGG 324.340 0.260 ... H4 2013 01 04 14 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345928 SPO 2012 09 15 01 10 00 834-99 S n2o CCGG 324.670 0.260 ... H4 2013 01 04 14 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345929 SPO 2012 09 15 01 14 00 2205-99 P n2o CCGG 324.660 0.260 ... H6 2013 01 23 10 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346008 SPO 2012 09 15 01 14 00 2206-99 P n2o CCGG 324.130 0.260 ... H6 2013 01 23 10 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346009 SPO 2012 09 24 05 10 00 1787-99 P n2o CCGG 324.390 0.260 ... H6 2013 01 23 10 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346002 SPO 2012 09 24 05 10 00 1788-99 P n2o CCGG 324.410 0.260 ... H6 2013 01 23 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346003 SPO 2012 10 01 01 11 00 3233-99 S n2o CCGG 324.300 0.260 ... H6 2013 01 23 09 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346004 SPO 2012 10 01 01 11 00 3234-99 S n2o CCGG 324.300 0.260 ... H6 2013 01 23 09 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346005 SPO 2012 10 01 01 16 00 2141-99 P n2o CCGG 324.400 0.260 ... H6 2013 01 22 16 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346006 SPO 2012 10 01 01 16 00 2142-99 P n2o CCGG 324.430 0.260 ... H6 2013 01 22 16 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346007 SPO 2012 10 08 01 28 00 3685-99 P n2o CCGG 323.360 0.260 A.. H6 2013 01 15 15 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346000 SPO 2012 10 08 01 28 00 3686-99 P n2o CCGG 324.280 0.260 ... H6 2013 01 15 15 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346001 SPO 2012 10 15 21 10 00 4703-99 S n2o CCGG 324.210 0.260 ... H6 2013 01 15 14 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345998 SPO 2012 10 15 21 10 00 4704-99 S n2o CCGG 324.360 0.260 ... H6 2013 01 15 15 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 345999 SPO 2012 10 15 21 14 00 1991-99 P n2o CCGG 324.360 0.260 ... H6 2013 01 15 14 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345988 SPO 2012 10 15 21 14 00 1992-99 P n2o CCGG 324.440 0.260 ... H6 2013 01 15 14 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345989 SPO 2012 10 24 01 13 00 2469-99 P n2o CCGG 324.430 0.260 ... H6 2013 01 15 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345986 SPO 2012 10 24 01 13 00 2470-99 P n2o CCGG 324.540 0.260 ... H6 2013 01 15 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 345987 SPO 2012 11 02 03 10 00 2597-99 S n2o CCGG 324.520 0.260 ... H6 2013 01 22 10 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346218 SPO 2012 11 02 03 10 00 2598-99 S n2o CCGG 324.490 0.260 ... H6 2013 01 22 10 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346219 SPO 2012 11 02 03 13 00 295-99 P n2o CCGG 324.750 0.260 ... H6 2013 01 22 11 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346216 SPO 2012 11 02 03 13 00 296-99 P n2o CCGG 324.380 0.260 ... H6 2013 01 22 11 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346217 SPO 2012 11 08 01 05 00 5411-99 P n2o CCGG 324.440 0.260 ... H6 2013 01 22 11 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346214 SPO 2012 11 08 01 05 00 5412-99 P n2o CCGG 324.730 0.260 ... H6 2013 01 22 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346215 SPO 2012 11 15 00 10 00 4057-99 P n2o CCGG 324.490 0.260 ... H6 2013 01 24 10 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346240 SPO 2012 11 15 00 10 00 4058-99 P n2o CCGG 324.430 0.260 ... H6 2013 01 24 10 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346241 SPO 2012 11 15 00 15 00 565-99 S n2o CCGG 324.300 0.260 ... H6 2013 01 17 16 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346220 SPO 2012 11 15 00 15 00 566-99 S n2o CCGG 324.230 0.260 ... H6 2013 01 17 16 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346221 SPO 2012 11 24 00 45 00 573-99 P n2o CCGG 324.550 0.260 ... H6 2013 01 24 10 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346238 SPO 2012 11 24 00 45 00 574-99 P n2o CCGG 324.590 0.260 ... H6 2013 01 24 10 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346239 SPO 2012 12 02 21 15 00 3013-99 P n2o CCGG 324.700 0.260 ... H6 2013 01 24 09 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346236 SPO 2012 12 02 21 15 00 3014-99 P n2o CCGG 324.640 0.260 ... H6 2013 01 24 09 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 346237 SPO 2012 12 02 21 20 00 4181-99 S n2o CCGG 324.780 0.260 ... H6 2013 01 24 08 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346234 SPO 2012 12 02 21 20 00 4182-99 S n2o CCGG 324.190 0.260 ... H6 2013 01 24 09 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 346235 SPO 2012 12 10 02 56 00 1410-99 P n2o CCGG 324.640 0.260 ... H6 2013 03 15 10 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348657 SPO 2012 12 10 02 56 00 256-99 P n2o CCGG 324.310 0.260 ... H6 2013 03 15 11 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348658 SPO 2012 12 15 02 06 00 5106-99 P n2o CCGG 324.400 0.260 ... H6 2013 03 15 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348659 SPO 2012 12 15 02 06 00 708-99 P n2o CCGG 324.530 0.260 ... H6 2013 03 15 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348660 SPO 2012 12 15 02 11 00 1299-99 S n2o CCGG 324.720 0.260 ... H6 2013 03 15 11 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 348655 SPO 2012 12 15 02 11 00 1592-99 S n2o CCGG 324.440 0.260 ... H6 2013 03 15 11 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 348656 SPO 2012 12 24 22 14 00 1682-99 P n2o CCGG 324.390 0.260 ... H6 2013 03 14 12 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348627 SPO 2012 12 24 22 14 00 876-99 P n2o CCGG 324.150 0.260 ... H6 2013 03 14 12 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348628 SPO 2013 01 01 19 15 00 4214-99 S n2o CCGG 323.970 0.260 ... H6 2013 03 14 13 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 348630 SPO 2013 01 01 19 15 00 944-99 S n2o CCGG 324.280 0.260 ... H6 2013 03 14 12 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 348629 SPO 2013 01 01 19 18 00 4209-99 P n2o CCGG 324.250 0.260 ... H6 2013 03 14 13 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348631 SPO 2013 01 01 19 18 00 4792-99 P n2o CCGG 324.210 0.260 ... H6 2013 03 14 13 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348632 SPO 2013 01 09 04 25 00 4636-99 P n2o CCGG 324.350 0.260 ... H6 2013 03 14 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348633 SPO 2013 01 09 04 25 00 633-99 P n2o CCGG 324.370 0.260 ... H6 2013 03 14 14 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348634 SPO 2013 01 15 21 09 00 3042-99 P n2o CCGG 324.570 0.260 ... H6 2013 03 14 14 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348625 SPO 2013 01 15 21 09 00 3490-99 P n2o CCGG 324.700 0.260 ... H6 2013 03 14 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 348626 SPO 2013 01 15 21 18 00 1806-99 S n2o CCGG 324.600 0.260 ... H4 2014 01 15 13 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362621 SPO 2013 01 15 21 18 00 3527-99 S n2o CCGG 324.370 0.260 ... H4 2014 01 15 14 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362622 SPO 2013 01 25 21 16 00 1931-99 P n2o CCGG 324.370 0.260 ... H4 2014 01 15 14 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362616 SPO 2013 01 25 21 16 00 2108-99 P n2o CCGG 324.620 0.260 ... H4 2014 01 15 14 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362615 SPO 2013 02 04 22 19 00 2846-99 S n2o CCGG 324.730 0.260 ... H4 2014 01 15 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362619 SPO 2013 02 04 22 19 00 3141-99 S n2o CCGG 324.990 0.260 ... H4 2014 01 15 15 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362620 SPO 2013 02 04 22 23 00 1891-99 P n2o CCGG 324.490 0.260 ... H4 2014 01 15 15 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362617 SPO 2013 02 04 22 23 00 2561-99 P n2o CCGG 324.080 0.260 ... H4 2014 01 15 15 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362618 SPO 2013 02 12 01 52 00 137-99 P n2o CCGG 324.260 0.260 ... H4 2014 01 17 14 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362556 SPO 2013 02 12 01 52 00 3189-99 P n2o CCGG 324.740 0.260 ... H4 2014 01 17 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362557 SPO 2013 02 15 01 06 00 1472-99 P n2o CCGG 324.860 0.260 ... H4 2014 01 17 15 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362552 SPO 2013 02 15 01 06 00 3729-99 P n2o CCGG 324.540 0.260 ... H4 2014 01 17 15 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362553 SPO 2013 02 15 01 12 00 26-99 S n2o CCGG 324.520 0.260 ... H4 2014 01 17 14 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362558 SPO 2013 02 15 01 12 00 605-99 S n2o CCGG 324.180 0.260 ... H4 2014 01 17 15 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362559 SPO 2013 02 24 23 38 00 3481-99 P n2o CCGG 324.080 0.260 ... H4 2014 01 21 11 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362555 SPO 2013 02 24 23 38 00 4914-99 P n2o CCGG 324.000 0.260 ... H4 2014 01 21 11 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362554 SPO 2013 03 01 01 10 00 1661-99 P n2o CCGG 324.590 0.260 ... H4 2014 01 14 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362612 SPO 2013 03 01 01 10 00 1662-99 P n2o CCGG 324.710 0.260 ... H4 2014 01 14 14 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362611 SPO 2013 03 01 01 16 00 2695-99 S n2o CCGG 324.500 0.260 ... H4 2014 01 14 13 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362613 SPO 2013 03 01 01 16 00 2696-99 S n2o CCGG 324.630 0.260 ... H4 2014 01 14 13 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362614 SPO 2013 03 08 02 00 00 3993-99 P n2o CCGG 324.340 0.260 ... H4 2014 01 14 14 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362607 SPO 2013 03 08 02 00 00 3994-99 P n2o CCGG 324.390 0.260 ... H4 2014 01 14 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362608 SPO 2013 03 15 00 09 00 5023-99 P n2o CCGG 324.490 0.260 ... H4 2014 01 14 14 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362610 SPO 2013 03 15 00 09 00 5024-99 P n2o CCGG 324.390 0.260 ... H4 2014 01 14 15 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362609 SPO 2013 03 15 00 17 00 2233-99 S n2o CCGG 324.600 0.260 ... H4 2014 01 15 09 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362578 SPO 2013 03 15 00 17 00 2234-99 S n2o CCGG 324.480 0.260 ... H4 2014 01 15 09 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362579 SPO 2013 03 25 02 44 00 1579-99 P n2o CCGG 324.420 0.260 ... H4 2014 01 15 10 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362572 SPO 2013 03 25 02 44 00 1580-99 P n2o CCGG 324.070 0.260 ... H4 2014 01 15 10 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362573 SPO 2013 04 02 19 13 00 3955-99 P n2o CCGG 324.410 0.260 ... H4 2014 01 15 10 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362574 SPO 2013 04 02 19 13 00 3956-99 P n2o CCGG 324.980 0.260 N.. H4 2014 01 15 11 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362575 SPO 2013 04 02 19 21 00 4937-99 S n2o CCGG 324.640 0.260 ... H4 2014 01 15 11 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362577 SPO 2013 04 02 19 21 00 4938-99 S n2o CCGG 324.680 0.260 ... H4 2014 01 15 11 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362576 SPO 2013 04 08 01 08 00 5179-99 P n2o CCGG 323.910 0.260 ... H4 2014 01 21 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362647 SPO 2013 04 08 01 08 00 5180-99 P n2o CCGG 323.990 0.260 ... H4 2014 01 21 12 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362648 SPO 2013 04 15 02 11 00 1737-99 P n2o CCGG 324.760 0.260 ... H4 2014 01 29 15 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362633 SPO 2013 04 15 02 11 00 1738-99 P n2o CCGG 324.430 0.260 ... H4 2014 01 29 15 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362634 SPO 2013 04 15 02 16 00 2725-99 S n2o CCGG 324.750 0.260 ... H4 2014 01 29 14 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362635 SPO 2013 04 15 02 16 00 2726-99 S n2o CCGG 324.800 0.260 ... H4 2014 01 29 14 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362636 SPO 2013 04 24 04 30 00 651-99 P n2o CCGG 324.400 0.260 ... H4 2014 01 29 14 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362631 SPO 2013 04 24 04 30 00 652-99 P n2o CCGG 324.310 0.260 ... H4 2014 01 29 15 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362632 SPO 2013 05 01 01 09 00 4203-99 P n2o CCGG 324.900 0.260 ... H4 2014 01 24 14 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362641 SPO 2013 05 01 01 09 00 4204-99 P n2o CCGG 324.600 0.260 ... H4 2014 01 24 15 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362642 SPO 2013 05 01 01 19 00 1735-99 S n2o CCGG 324.650 0.260 ... H4 2014 01 24 15 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362645 SPO 2013 05 01 01 19 00 1736-99 S n2o CCGG 324.760 0.260 ... H4 2014 01 24 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362646 SPO 2013 05 08 04 09 00 1387-99 P n2o CCGG 324.450 0.260 ... H4 2014 01 24 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362643 SPO 2013 05 08 04 09 00 1388-99 P n2o CCGG 324.360 0.260 ... H4 2014 01 24 16 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362644 SPO 2013 05 15 02 19 00 1723-99 S n2o CCGG 324.670 0.260 ... H4 2014 01 29 13 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362637 SPO 2013 05 15 02 19 00 1724-99 S n2o CCGG 324.820 0.260 ... H4 2014 01 29 13 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362638 SPO 2013 05 15 02 23 00 4025-99 P n2o CCGG 324.500 0.260 ... H4 2014 01 22 15 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362564 SPO 2013 05 15 02 23 00 4026-99 P n2o CCGG 324.090 0.260 ... H4 2014 01 22 16 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362565 SPO 2013 05 24 11 11 00 4477-99 P n2o CCGG 324.800 0.260 ... H4 2014 01 22 16 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362562 SPO 2013 05 24 11 11 00 4478-99 P n2o CCGG 324.830 0.260 ... H4 2014 01 22 16 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362563 SPO 2013 06 01 01 13 00 275-99 P n2o CCGG 324.830 0.260 ... H4 2014 01 23 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362560 SPO 2013 06 01 01 13 00 276-99 P n2o CCGG 324.850 0.260 ... H4 2014 01 23 12 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362561 SPO 2013 06 01 01 18 00 5367-99 S n2o CCGG 324.470 0.260 ... H4 2014 01 23 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362566 SPO 2013 06 01 01 18 00 5368-99 S n2o CCGG 324.830 0.260 ... H4 2014 01 23 12 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362567 SPO 2013 06 08 01 30 00 5121-99 P n2o CCGG 324.880 0.260 ... H4 2014 01 24 13 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362542 SPO 2013 06 08 01 30 00 5122-99 P n2o CCGG 324.330 0.260 ... H4 2014 01 24 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362543 SPO 2013 06 15 01 14 00 5369-99 P n2o CCGG 324.270 0.260 ... H4 2014 01 24 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362538 SPO 2013 06 15 01 14 00 5370-99 P n2o CCGG 324.050 0.260 ... H4 2014 01 24 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362539 SPO 2013 06 15 01 19 00 443-99 S n2o CCGG 325.070 0.260 ... H4 2014 01 24 11 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362536 SPO 2013 06 15 01 19 00 444-99 S n2o CCGG 324.810 0.260 ... H4 2014 01 24 12 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362537 SPO 2013 06 24 02 31 00 717-99 P n2o CCGG 323.790 0.260 ... H4 2014 01 24 13 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362540 SPO 2013 06 24 02 31 00 718-99 P n2o CCGG 324.570 0.260 ... H4 2014 01 24 13 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362541 SPO 2013 07 01 01 17 00 4056-99 P n2o CCGG 324.840 0.260 ... H4 2014 01 22 10 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362594 SPO 2013 07 01 01 24 00 1601-99 S n2o CCGG 324.730 0.260 ... H4 2014 01 22 09 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362597 SPO 2013 07 01 01 24 00 4009-99 S n2o CCGG 324.800 0.260 ... H4 2014 01 22 10 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362598 SPO 2013 07 01 02 43 00 4510-99 P n2o CCGG 324.750 0.260 ... H4 2014 01 22 11 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362595 SPO 2013 07 01 02 43 00 850-99 P n2o CCGG 324.670 0.260 ... H4 2014 01 22 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362596 SPO 2013 07 08 02 50 00 4873-99 P n2o CCGG 324.340 0.260 ... H4 2014 01 22 11 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362592 SPO 2013 07 08 02 50 00 5194-99 P n2o CCGG 324.910 0.260 ... H4 2014 01 22 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362593 SPO 2013 07 16 02 19 00 1321-99 P n2o CCGG 324.640 0.260 ... H4 2014 01 23 15 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362603 SPO 2013 07 16 02 19 00 4725-99 P n2o CCGG 325.140 0.260 ... H4 2014 01 23 15 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362604 SPO 2013 07 16 02 22 00 1793-99 S n2o CCGG 325.020 0.260 ... H4 2014 01 23 11 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362605 SPO 2013 07 16 02 22 00 3228-99 S n2o CCGG 324.750 0.260 ... H4 2014 01 23 11 55 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362606 SPO 2013 07 24 03 41 00 1516-99 P n2o CCGG 325.420 0.260 ... H4 2014 01 23 15 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362601 SPO 2013 07 24 03 41 00 2734-99 P n2o CCGG 325.090 0.260 ... H4 2014 01 23 16 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362602 SPO 2013 08 01 02 17 00 2566-99 P n2o CCGG 325.290 0.260 ... H4 2014 01 24 11 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362599 SPO 2013 08 01 02 17 00 4540-99 P n2o CCGG 325.260 0.260 ... H4 2014 01 24 11 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362600 SPO 2013 08 01 02 22 00 5269-99 S n2o CCGG 325.190 0.260 ... H4 2014 01 23 13 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362669 SPO 2013 08 01 02 22 00 5270-99 S n2o CCGG 324.880 0.260 ... H4 2014 01 23 14 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362670 SPO 2013 08 08 21 15 00 4787-99 P n2o CCGG 325.290 0.260 ... H4 2014 01 23 14 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362663 SPO 2013 08 08 21 15 00 4788-99 P n2o CCGG 325.170 0.260 ... H4 2014 01 23 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362664 SPO 2013 08 15 02 16 00 3629-99 P n2o CCGG 325.280 0.260 ... H4 2014 01 24 14 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362639 SPO 2013 08 15 02 16 00 3630-99 P n2o CCGG 325.100 0.260 ... H4 2014 01 24 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362640 SPO 2013 08 15 02 19 00 989-99 S n2o CCGG 325.210 0.260 ... H4 2014 01 23 14 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362667 SPO 2013 08 15 02 19 00 990-99 S n2o CCGG 324.830 0.260 ... H4 2014 01 23 15 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362668 SPO 2013 08 25 23 32 00 2817-99 P n2o CCGG 325.470 0.260 ... H4 2014 01 16 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362671 SPO 2013 08 25 23 32 00 2818-99 P n2o CCGG 325.450 0.260 ... H4 2014 01 16 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362672 SPO 2013 09 01 02 12 00 1057-99 P n2o CCGG 324.700 0.260 ... H4 2014 01 16 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362673 SPO 2013 09 01 02 12 00 1058-99 P n2o CCGG 325.400 0.260 ... H4 2014 01 16 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362674 SPO 2013 09 01 02 15 00 2611-99 S n2o CCGG 325.330 0.260 ... H4 2014 01 16 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362675 SPO 2013 09 01 02 15 00 2612-99 S n2o CCGG 324.860 0.260 ... H4 2014 01 16 13 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362676 SPO 2013 09 08 02 27 00 81-99 P n2o CCGG 325.710 0.260 N.. H4 2014 01 23 13 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362665 SPO 2013 09 08 02 27 00 82-99 P n2o CCGG 325.610 0.260 ... H4 2014 01 23 13 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362666 SPO 2013 09 16 22 12 00 1074-99 P n2o CCGG 325.490 0.260 ... H4 2014 01 27 10 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362549 SPO 2013 09 16 22 12 00 1424-99 P n2o CCGG 325.130 0.260 ... H4 2014 01 27 09 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362548 SPO 2013 09 16 22 15 00 3879-99 S n2o CCGG 325.430 0.260 ... H4 2014 01 24 16 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362550 SPO 2013 09 16 22 15 00 664-99 S n2o CCGG 325.500 0.260 ... H4 2014 01 24 16 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362551 SPO 2013 09 24 04 27 00 2332-99 P n2o CCGG 325.510 0.260 ... H4 2014 01 27 10 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362547 SPO 2013 09 24 04 27 00 3024-99 P n2o CCGG 325.840 0.260 ... H4 2014 01 27 10 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362546 SPO 2013 10 01 20 15 00 3240-99 P n2o CCGG 325.610 0.260 ... H4 2014 01 27 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362545 SPO 2013 10 01 20 15 00 3456-99 P n2o CCGG 325.960 0.260 ... H4 2014 01 27 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362544 SPO 2013 10 01 20 18 00 1104-99 S n2o CCGG 325.570 0.260 ... H4 2014 01 17 12 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362629 SPO 2013 10 01 20 18 00 1156-99 S n2o CCGG 325.350 0.260 ... H4 2014 01 17 12 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362630 SPO 2013 10 08 23 53 00 2185-99 P n2o CCGG 325.540 0.260 ... H4 2014 01 17 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362625 SPO 2013 10 08 23 53 00 3208-99 P n2o CCGG 325.360 0.260 ... H4 2014 01 17 13 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362626 SPO 2013 10 15 02 15 00 1743-99 P n2o CCGG 325.620 0.260 ... H4 2014 01 17 13 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362623 SPO 2013 10 15 02 15 00 5356-99 P n2o CCGG 325.730 0.260 ... H4 2014 01 17 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362624 SPO 2013 10 15 02 23 00 1413-99 S n2o CCGG 325.490 0.260 ... H4 2014 01 17 14 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362627 SPO 2013 10 15 02 23 00 1955-99 S n2o CCGG 325.500 0.260 ... H4 2014 01 17 13 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362628 SPO 2013 10 24 02 54 00 3168-99 P n2o CCGG 325.160 0.260 ... H4 2014 01 22 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362655 SPO 2013 10 24 02 54 00 4190-99 P n2o CCGG 325.340 0.260 ... H4 2014 01 22 14 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362656 SPO 2013 11 02 02 13 00 1213-99 P n2o CCGG 325.490 0.260 ... H4 2014 01 22 14 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362657 SPO 2013 11 02 02 13 00 1488-99 P n2o CCGG 325.260 0.260 ... H4 2014 01 22 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362658 SPO 2013 11 02 02 15 00 3131-99 S n2o CCGG 325.920 0.260 ... H4 2014 01 22 14 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362661 SPO 2013 11 02 02 15 00 3322-99 S n2o CCGG 325.790 0.260 ... H4 2014 01 22 14 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362662 SPO 2013 11 08 02 08 00 4525-99 P n2o CCGG 325.620 0.260 ... H4 2014 01 21 13 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362649 SPO 2013 11 08 02 08 00 5070-99 P n2o CCGG 325.710 0.260 ... H4 2014 01 21 13 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362650 SPO 2013 11 18 01 25 00 3221-99 P n2o CCGG 325.280 0.260 ... H4 2014 01 21 14 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362653 SPO 2013 11 18 01 25 00 637-99 P n2o CCGG 325.790 0.260 ... H4 2014 01 21 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362652 SPO 2013 11 18 01 30 00 1857-99 S n2o CCGG 325.300 0.260 ... H4 2014 01 21 14 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362654 SPO 2013 11 18 01 30 00 3321-99 S n2o CCGG 325.270 0.260 ... H4 2014 01 21 14 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 362651 SPO 2013 11 24 02 50 00 3054-99 P n2o CCGG 325.780 0.260 ... H4 2014 01 22 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362659 SPO 2013 11 24 02 50 00 4295-99 P n2o CCGG 325.580 0.260 ... H4 2014 01 22 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 362660 SPO 2013 12 01 03 33 00 2456-99 P n2o CCGG 325.400 0.260 ... H6 2014 02 27 09 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364575 SPO 2013 12 01 03 33 00 3347-99 P n2o CCGG 325.650 0.260 ... H6 2014 02 27 09 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364574 SPO 2013 12 01 20 17 00 1789-99 S n2o CCGG 325.690 0.260 ... H6 2014 02 27 09 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364578 SPO 2013 12 01 20 17 00 2030-99 S n2o CCGG 325.800 0.260 ... H6 2014 02 27 09 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364579 SPO 2013 12 08 12 49 00 1365-99 P n2o CCGG 325.580 0.260 ... H6 2014 02 27 10 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364576 SPO 2013 12 08 12 49 00 2083-99 P n2o CCGG 325.830 0.260 ... H6 2014 02 27 10 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364577 SPO 2013 12 17 22 24 00 1974-99 S n2o CCGG 325.730 0.260 ... H6 2014 02 27 10 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364581 SPO 2013 12 17 22 24 00 2793-99 S n2o CCGG 325.540 0.260 ... H6 2014 02 27 10 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364580 SPO 2013 12 17 22 30 00 4411-99 P n2o CCGG 325.480 0.260 ... H6 2014 02 27 11 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364586 SPO 2013 12 17 22 30 00 4790-99 P n2o CCGG 325.740 0.260 ... H6 2014 02 27 11 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364587 SPO 2013 12 26 00 45 00 2211-99 P n2o CCGG 326.110 0.260 ... H6 2014 02 27 12 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364588 SPO 2013 12 26 00 45 00 3496-99 P n2o CCGG 326.080 0.260 ... H6 2014 02 27 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364589 SPO 2014 01 01 01 15 00 2449-99 P n2o CCGG 325.730 0.260 ... H6 2014 02 27 13 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364582 SPO 2014 01 01 01 15 00 456-99 P n2o CCGG 325.720 0.260 ... H6 2014 02 27 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 364583 SPO 2014 01 01 01 19 00 1435-99 S n2o CCGG 325.330 0.260 ... H6 2014 02 27 13 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364584 SPO 2014 01 01 01 19 00 4972-99 S n2o CCGG 325.630 0.260 ... H6 2014 02 27 14 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 364585 SPO 2014 01 08 20 30 00 1547-99 P n2o CCGG 325.660 0.260 ... H4 2014 04 18 14 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366762 SPO 2014 01 08 20 30 00 4956-99 P n2o CCGG 325.440 0.260 ... H4 2014 04 18 14 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366763 SPO 2014 01 15 16 54 00 4121-99 P n2o CCGG 325.500 0.260 ... H4 2014 04 18 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366754 SPO 2014 01 15 16 54 00 4166-99 P n2o CCGG 325.820 0.260 ... H4 2014 04 18 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366755 SPO 2014 01 15 17 12 00 4020-99 S n2o CCGG 325.570 0.260 ... H4 2014 04 18 15 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 366757 SPO 2014 01 15 17 12 00 4713-99 S n2o CCGG 325.480 0.260 ... H4 2014 04 18 15 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 366756 SPO 2014 01 24 01 52 00 12-99 P n2o CCGG 325.660 0.260 ... H4 2014 04 18 15 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366760 SPO 2014 01 24 01 52 00 3407-99 P n2o CCGG 325.500 0.260 ... H4 2014 04 18 15 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366761 SPO 2014 02 02 01 13 00 2745-99 P n2o CCGG 325.430 0.260 ... H4 2014 04 18 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366764 SPO 2014 02 02 01 13 00 4358-99 P n2o CCGG 325.780 0.260 ... H4 2014 04 18 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366765 SPO 2014 02 02 02 11 00 1924-99 P n2o CCGG 325.870 0.260 ... H4 2014 04 18 13 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366766 SPO 2014 02 02 02 11 00 818-99 P n2o CCGG 325.580 0.260 ... H4 2014 04 18 13 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366767 SPO 2014 02 02 02 15 00 1914-99 S n2o CCGG 325.520 0.260 ... H4 2014 04 18 16 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 366759 SPO 2014 02 02 02 15 00 3193-99 S n2o CCGG 325.250 0.260 ... H4 2014 04 18 16 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 366758 SPO 2014 02 06 03 23 00 1054-99 P n2o CCGG 325.170 0.260 ... H4 2014 04 18 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366768 SPO 2014 02 06 03 23 00 1442-99 P n2o CCGG 325.520 0.260 ... H4 2014 04 18 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 366769 SPO 2014 02 15 03 12 00 1893-99 P n2o CCGG 325.590 0.260 ... H4 2015 01 29 14 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380483 SPO 2014 02 15 03 12 00 3425-99 P n2o CCGG 325.480 0.260 ... H4 2015 01 29 14 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380484 SPO 2014 02 15 03 19 00 1531-99 S n2o CCGG 325.710 0.260 ... H4 2015 01 29 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380485 SPO 2014 02 15 03 19 00 4388-99 S n2o CCGG 325.330 0.260 ... H4 2015 01 29 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380486 SPO 2014 02 24 00 48 00 4132-99 P n2o CCGG 325.580 0.260 ... H4 2015 01 30 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380505 SPO 2014 02 24 00 48 00 4235-99 P n2o CCGG 325.480 0.260 ... H4 2015 01 30 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380504 SPO 2014 03 01 05 12 00 2282-99 P n2o CCGG 325.400 0.260 ... H4 2015 01 23 10 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380521 SPO 2014 03 01 05 12 00 4779-99 P n2o CCGG 325.280 0.260 ... H4 2015 01 23 10 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380520 SPO 2014 03 01 05 18 00 2999-99 S n2o CCGG 325.770 0.260 ... H4 2015 01 30 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380506 SPO 2014 03 01 05 18 00 720-99 S n2o CCGG 325.590 0.260 ... H4 2015 01 30 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380507 SPO 2014 03 08 05 51 00 1181-99 P n2o CCGG 325.560 0.260 ... H4 2015 01 23 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380522 SPO 2014 03 08 05 51 00 826-99 P n2o CCGG 325.340 0.260 ... H4 2015 01 23 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380523 SPO 2014 03 19 14 12 00 2704-99 P n2o CCGG 325.560 0.260 ... H4 2015 01 29 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380481 SPO 2014 03 19 14 12 00 973-99 P n2o CCGG 325.170 0.260 ... H4 2015 01 29 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380482 SPO 2014 03 19 14 19 00 3753-99 S n2o CCGG 325.300 0.260 ... H4 2015 01 29 12 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380488 SPO 2014 03 19 14 19 00 3845-99 S n2o CCGG 325.010 0.260 ... H4 2015 01 29 12 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380487 SPO 2014 03 24 01 24 00 22-99 P n2o CCGG 325.800 0.260 ... H4 2015 01 28 13 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380188 SPO 2014 03 24 01 24 00 244-99 P n2o CCGG 324.960 0.260 ... H4 2015 01 28 12 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380187 SPO 2014 04 01 01 14 00 1777-99 P n2o CCGG 325.660 0.260 ... H4 2015 01 28 14 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380191 SPO 2014 04 01 01 14 00 485-99 P n2o CCGG 325.760 0.260 ... H4 2015 01 28 14 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380192 SPO 2014 04 01 11 17 00 4806-99 S n2o CCGG 325.610 0.260 ... H4 2015 01 28 13 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380189 SPO 2014 04 01 11 17 00 585-99 S n2o CCGG 325.780 0.260 ... H4 2015 01 28 13 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380190 SPO 2014 04 08 01 17 00 3918-99 P n2o CCGG 325.270 0.260 ... H4 2015 01 28 14 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380193 SPO 2014 04 08 01 17 00 554-99 P n2o CCGG 325.390 0.260 ... H4 2015 01 28 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380194 SPO 2014 04 15 02 09 00 4884-99 P n2o CCGG 325.480 0.260 ... H4 2015 01 13 11 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380180 SPO 2014 04 15 02 09 00 5215-99 P n2o CCGG 325.000 0.260 ... H4 2015 01 13 10 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380179 SPO 2014 04 15 02 15 00 1901-99 S n2o CCGG 325.350 0.260 ... H4 2015 01 13 11 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380181 SPO 2014 04 15 02 15 00 3434-99 S n2o CCGG 325.310 0.260 ... H4 2015 01 13 11 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380182 SPO 2014 04 24 01 55 00 4757-99 P n2o CCGG 325.710 0.260 ... H4 2015 01 13 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380183 SPO 2014 04 24 01 55 00 4944-99 P n2o CCGG 325.640 0.260 ... H4 2015 01 13 12 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380184 SPO 2014 05 02 23 12 00 1827-99 P n2o CCGG 325.410 0.260 ... H4 2015 01 21 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380219 SPO 2014 05 02 23 12 00 4961-99 P n2o CCGG 325.580 0.260 ... H4 2015 01 21 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380220 SPO 2014 05 02 23 18 00 4141-99 S n2o CCGG 325.350 0.260 ... H4 2015 01 13 12 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380186 SPO 2014 05 02 23 18 00 5045-99 S n2o CCGG 325.560 0.260 ... H4 2015 01 13 12 27 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380185 SPO 2014 05 08 03 27 00 949-99 P n2o CCGG 325.620 0.260 ... H4 2015 01 21 13 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380221 SPO 2014 05 08 03 27 00 986-99 P n2o CCGG 325.750 0.260 ... H4 2015 01 21 13 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380222 SPO 2014 05 15 01 11 00 1907-99 P n2o CCGG 325.730 0.260 ... H4 2015 01 21 13 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380223 SPO 2014 05 15 01 11 00 977-99 P n2o CCGG 325.350 0.260 ... H4 2015 01 21 13 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380224 SPO 2014 05 15 01 18 00 3765-99 S n2o CCGG 325.300 0.260 ... H4 2015 01 21 14 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380225 SPO 2014 05 15 01 18 00 3976-99 S n2o CCGG 325.760 0.260 ... H4 2015 01 21 14 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380226 SPO 2014 05 24 02 41 00 3244-99 P n2o CCGG 325.750 0.260 ... H4 2015 01 20 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380212 SPO 2014 05 24 02 41 00 4899-99 P n2o CCGG 325.770 0.260 ... H4 2015 01 20 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380211 SPO 2014 06 01 01 12 00 1182-99 P n2o CCGG 325.810 0.260 ... H4 2015 01 20 12 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380213 SPO 2014 06 01 01 12 00 4908-99 P n2o CCGG 325.810 0.260 ... H4 2015 01 20 13 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380214 SPO 2014 06 01 01 18 00 1328-99 S n2o CCGG 325.760 0.260 ... H4 2015 01 20 13 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380215 SPO 2014 06 01 01 18 00 546-99 S n2o CCGG 326.040 0.260 ... H4 2015 01 20 13 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380216 SPO 2014 06 08 01 46 00 3705-99 P n2o CCGG 324.880 0.260 A.. H4 2015 01 20 14 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380217 SPO 2014 06 08 01 46 00 4918-99 P n2o CCGG 325.680 0.260 ... H4 2015 01 20 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380218 SPO 2014 06 15 01 12 00 2136-99 P n2o CCGG 325.830 0.260 ... H4 2015 01 26 12 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380236 SPO 2014 06 15 01 12 00 4081-99 P n2o CCGG 325.880 0.260 ... H4 2015 01 26 12 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380235 SPO 2014 06 15 01 17 00 283-99 S n2o CCGG 325.660 0.260 ... H4 2015 01 26 12 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380237 SPO 2014 06 15 01 17 00 4332-99 S n2o CCGG 325.610 0.260 ... H4 2015 01 26 13 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380238 SPO 2014 06 26 03 52 00 1863-99 P n2o CCGG 325.430 0.260 ... H4 2015 01 26 13 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380239 SPO 2014 06 26 03 52 00 213-99 P n2o CCGG 325.920 0.260 ... H4 2015 01 26 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380240 SPO 2014 07 01 23 14 00 2155-99 P n2o CCGG 325.840 0.260 ... H4 2015 01 26 14 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380241 SPO 2014 07 01 23 14 00 901-99 P n2o CCGG 325.770 0.260 ... H4 2015 01 26 13 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380242 SPO 2014 07 01 23 19 00 231-99 S n2o CCGG 325.260 0.260 ... H4 2015 01 23 13 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380227 SPO 2014 07 01 23 19 00 3539-99 S n2o CCGG 325.790 0.260 ... H4 2015 01 23 13 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380228 SPO 2014 07 08 21 14 00 2984-99 P n2o CCGG 326.030 0.260 ... H4 2015 01 23 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380229 SPO 2014 07 08 21 14 00 4672-99 P n2o CCGG 326.010 0.260 ... H4 2015 01 23 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380230 SPO 2014 07 15 02 13 00 1355-99 P n2o CCGG 325.810 0.260 ... H4 2015 01 23 15 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380234 SPO 2014 07 15 02 13 00 3116-99 P n2o CCGG 325.960 0.260 ... H4 2015 01 23 14 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380233 SPO 2014 07 15 02 16 00 198-99 S n2o CCGG 325.730 0.260 ... H4 2015 01 23 14 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380231 SPO 2014 07 15 02 16 00 552-99 S n2o CCGG 325.890 0.260 ... H4 2015 01 23 14 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380232 SPO 2014 07 24 23 48 00 1476-99 P n2o CCGG 326.260 0.260 ... H4 2015 01 22 14 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380512 SPO 2014 07 24 23 48 00 5192-99 P n2o CCGG 326.480 0.260 ... H4 2015 01 22 15 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380513 SPO 2014 08 01 18 11 00 2749-99 P n2o CCGG 326.410 0.260 ... H4 2015 01 22 15 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380514 SPO 2014 08 01 18 11 00 906-99 P n2o CCGG 326.200 0.260 ... H4 2015 01 22 15 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380515 SPO 2014 08 01 18 16 00 5136-99 S n2o CCGG 326.410 0.260 ... H4 2015 01 22 16 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380518 SPO 2014 08 01 18 16 00 541-99 S n2o CCGG 326.060 0.260 ... H4 2015 01 22 16 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380519 SPO 2014 08 08 01 29 00 1512-99 P n2o CCGG 326.410 0.260 ... H4 2015 01 22 16 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380517 SPO 2014 08 08 01 29 00 2069-99 P n2o CCGG 326.100 0.260 ... H4 2015 01 22 16 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380516 SPO 2014 08 15 01 12 00 1518-99 P n2o CCGG 326.250 0.260 ... H4 2015 01 30 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380509 SPO 2014 08 15 01 12 00 4427-99 P n2o CCGG 326.240 0.260 ... H4 2015 01 30 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380508 SPO 2014 08 15 01 19 00 3935-99 S n2o CCGG 325.950 0.260 ... H4 2015 01 30 12 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380510 SPO 2014 08 15 01 19 00 590-99 S n2o CCGG 326.020 0.260 ... H4 2015 01 30 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380511 SPO 2014 08 24 01 30 00 3171-99 P n2o CCGG 326.100 0.260 ... H4 2015 01 23 12 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380524 SPO 2014 08 24 01 30 00 4830-99 P n2o CCGG 326.430 0.260 ... H4 2015 01 23 12 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380525 SPO 2014 09 02 01 03 00 1094-99 P n2o CCGG 326.290 0.260 ... H4 2015 01 15 10 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380324 SPO 2014 09 02 01 03 00 4647-99 P n2o CCGG 326.450 0.260 ... H4 2015 01 15 10 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380323 SPO 2014 09 02 01 20 00 1563-99 S n2o CCGG 326.410 0.260 ... H4 2015 01 15 09 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380322 SPO 2014 09 02 01 20 00 2873-99 S n2o CCGG 326.550 0.260 ... H4 2015 01 15 09 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380321 SPO 2014 09 02 02 21 00 4800-99 S n2o CCGG 326.420 0.260 ... H4 2015 02 03 10 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380526 SPO 2014 09 08 01 59 00 2880-99 P n2o CCGG 326.010 0.260 ... H4 2015 01 15 10 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380325 SPO 2014 09 08 01 59 00 4352-99 P n2o CCGG 326.500 0.260 ... H4 2015 01 15 10 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380326 SPO 2014 09 15 02 09 00 4904-99 P n2o CCGG 326.620 0.260 ... H4 2015 01 15 11 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380327 SPO 2014 09 15 02 09 00 510-99 P n2o CCGG 326.310 0.260 ... H4 2015 01 15 11 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380328 SPO 2014 09 15 02 16 00 2824-99 S n2o CCGG 326.150 0.260 ... H4 2015 01 16 12 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380313 SPO 2014 09 15 02 16 00 4402-99 S n2o CCGG 326.450 0.260 ... H4 2015 01 16 12 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380314 SPO 2014 09 24 23 11 00 3256-99 P n2o CCGG 326.520 0.260 ... H4 2015 01 16 13 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380315 SPO 2014 09 24 23 11 00 3782-99 P n2o CCGG 326.540 0.260 N.. H4 2015 01 16 13 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380316 SPO 2014 10 02 00 08 00 102-99 P n2o CCGG 326.260 0.260 ... H4 2015 01 16 14 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380320 SPO 2014 10 02 00 08 00 1599-99 P n2o CCGG 326.730 0.260 ... H4 2015 01 16 14 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380319 SPO 2014 10 02 00 16 00 1154-99 S n2o CCGG 326.510 0.260 ... H4 2015 01 16 13 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380318 SPO 2014 10 02 00 16 00 4432-99 S n2o CCGG 326.800 0.260 ... H4 2015 01 16 13 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380317 SPO 2014 10 08 04 12 00 4482-99 P n2o CCGG 326.570 0.260 ... H4 2015 01 14 11 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380207 SPO 2014 10 08 04 12 00 4590-99 P n2o CCGG 326.660 0.260 ... H4 2015 01 14 11 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380208 SPO 2014 10 15 00 09 00 4112-99 P n2o CCGG 326.570 0.260 ... H4 2015 01 14 13 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380204 SPO 2014 10 15 00 09 00 902-99 P n2o CCGG 326.590 0.260 ... H4 2015 01 14 12 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380203 SPO 2014 10 15 00 15 00 1356-99 S n2o CCGG 326.740 0.260 ... H4 2015 01 14 12 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380210 SPO 2014 10 15 00 15 00 1681-99 S n2o CCGG 326.860 0.260 ... H4 2015 01 14 11 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380209 SPO 2014 10 24 01 23 00 4838-99 P n2o CCGG 326.860 0.260 ... H4 2015 01 14 12 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380206 SPO 2014 10 24 01 23 00 98-99 P n2o CCGG 326.870 0.260 ... H4 2015 01 14 12 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380205 SPO 2014 11 01 00 11 00 3609-99 P n2o CCGG 326.820 0.260 ... H4 2015 01 27 13 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380199 SPO 2014 11 01 00 11 00 668-99 P n2o CCGG 326.950 0.260 ... H4 2015 01 27 13 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380200 SPO 2014 11 01 00 16 00 4413-99 S n2o CCGG 326.610 0.260 ... H4 2015 01 27 12 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380197 SPO 2014 11 01 00 16 00 4610-99 S n2o CCGG 326.760 0.260 ... H4 2015 01 27 13 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380198 SPO 2014 11 09 01 36 00 478-99 P n2o CCGG 326.920 0.260 ... H4 2015 01 27 13 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380201 SPO 2014 11 09 01 36 00 520-99 P n2o CCGG 326.840 0.260 ... H4 2015 01 27 14 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 380202 SPO 2014 11 15 03 15 00 4597-99 S n2o CCGG 326.540 0.260 ... H4 2015 01 27 14 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380195 SPO 2014 11 15 03 15 00 4983-99 S n2o CCGG 326.710 0.260 ... H4 2015 01 27 14 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 380196 SPO 2014 12 01 05 09 00 3257-99 P n2o CCGG 326.790 0.260 ... H4 2015 03 20 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382924 SPO 2014 12 01 05 09 00 4091-99 P n2o CCGG 326.870 0.260 ... H4 2015 03 20 13 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382928 SPO 2014 12 01 05 15 00 1477-99 S n2o CCGG 326.680 0.260 ... H4 2015 03 20 12 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382925 SPO 2014 12 01 05 15 00 486-99 S n2o CCGG 326.470 0.260 ... H4 2015 03 20 12 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382929 SPO 2014 12 08 02 06 00 4541-99 P n2o CCGG 326.660 0.260 ... H4 2015 03 20 11 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382926 SPO 2014 12 08 02 06 00 846-99 P n2o CCGG 326.990 0.260 ... H4 2015 03 20 11 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382927 SPO 2014 12 16 02 20 00 1299-99 P n2o CCGG 326.750 0.260 ... H4 2015 03 20 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382922 SPO 2014 12 16 02 20 00 1425-99 P n2o CCGG 326.840 0.260 ... H4 2015 03 20 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382923 SPO 2014 12 16 02 24 00 2660-99 S n2o CCGG 326.950 0.260 ... H4 2015 03 25 16 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382914 SPO 2014 12 16 02 24 00 587-99 S n2o CCGG 326.750 0.260 ... H4 2015 03 25 16 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382915 SPO 2014 12 24 04 50 00 2036-99 P n2o CCGG 327.110 0.260 ... H4 2015 03 25 15 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382911 SPO 2014 12 24 04 50 00 353-99 P n2o CCGG 327.160 0.260 ... H4 2015 03 25 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382910 SPO 2015 01 02 04 13 00 2409-99 P n2o CCGG 327.110 0.260 ... H4 2015 03 25 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382908 SPO 2015 01 02 04 13 00 670-99 P n2o CCGG 326.990 0.260 ... H4 2015 03 25 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 382909 SPO 2015 01 02 04 20 00 1189-99 S n2o CCGG 327.150 0.260 ... H4 2015 03 25 15 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382912 SPO 2015 01 02 04 20 00 3519-99 S n2o CCGG 326.940 0.260 ... H4 2015 03 25 15 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 382913 SPO 2015 01 09 22 27 00 197-99 P n2o CCGG 327.080 0.260 ... H4 2015 04 06 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383927 SPO 2015 01 09 22 27 00 2025-99 P n2o CCGG 326.990 0.260 ... H4 2015 04 06 15 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383928 SPO 2015 01 15 04 00 00 2125-99 P n2o CCGG 327.040 0.260 ... H4 2015 04 06 14 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383923 SPO 2015 01 15 04 00 00 5333-99 P n2o CCGG 327.030 0.260 ... H4 2015 04 06 14 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383924 SPO 2015 01 15 04 14 00 1780-99 S n2o CCGG 328.420 0.260 N.. H4 2015 04 06 14 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383925 SPO 2015 01 15 04 14 00 2499-99 S n2o CCGG 327.040 0.260 ... H4 2015 04 06 15 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383926 SPO 2015 01 23 03 45 00 4265-99 P n2o CCGG 327.200 0.260 ... H4 2015 04 06 13 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383921 SPO 2015 01 23 03 45 00 4706-99 P n2o CCGG 326.930 0.260 ... H4 2015 04 06 14 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383922 SPO 2015 02 02 18 09 00 2259-99 P n2o CCGG 327.330 0.260 ... H4 2015 04 07 09 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383933 SPO 2015 02 02 18 09 00 3743-99 P n2o CCGG 326.800 0.260 ... H4 2015 04 07 09 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383934 SPO 2015 02 02 18 21 00 233-99 S n2o CCGG 327.010 0.260 ... H4 2015 04 07 10 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383935 SPO 2015 02 02 18 21 00 29-99 S n2o CCGG 326.770 0.260 ... H4 2015 04 07 10 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383936 SPO 2015 02 08 01 15 00 1305-99 P n2o CCGG 326.800 0.260 ... H4 2015 04 06 15 59 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383931 SPO 2015 02 08 01 15 00 2315-99 P n2o CCGG 326.940 0.260 ... H4 2015 04 06 16 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 383932 SPO 2015 02 08 01 22 00 3628-99 S n2o CCGG 326.840 0.260 ... H4 2015 04 06 16 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383930 SPO 2015 02 08 01 22 00 601-99 S n2o CCGG 326.890 0.260 ... H4 2015 04 06 16 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 383929 SPO 2015 02 16 04 15 00 1771-99 P n2o CCGG 326.960 0.260 ... H4 2015 12 14 14 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398847 SPO 2015 02 16 04 15 00 5199-99 P n2o CCGG 326.940 0.260 ... H4 2015 12 14 14 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398848 SPO 2015 02 16 04 23 00 1165-99 S n2o CCGG 327.160 0.260 ... H4 2015 12 14 13 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398851 SPO 2015 02 16 04 23 00 3091-99 S n2o CCGG 327.180 0.260 ... H4 2015 12 14 13 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398852 SPO 2015 02 24 02 25 00 1743-99 P n2o CCGG 326.870 0.260 ... H4 2015 12 14 14 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398849 SPO 2015 02 24 02 25 00 5356-99 P n2o CCGG 326.820 0.260 ... H4 2015 12 14 15 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398850 SPO 2015 03 01 22 16 00 3640-99 P n2o CCGG 327.370 0.260 ... H4 2015 12 16 10 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398855 SPO 2015 03 01 22 16 00 4536-99 P n2o CCGG 326.870 0.260 ... H4 2015 12 16 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398856 SPO 2015 03 01 22 23 00 55-99 S n2o CCGG 326.860 0.260 ... H4 2015 12 14 15 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398853 SPO 2015 03 01 22 23 00 576-99 S n2o CCGG 326.610 0.260 ... H4 2015 12 14 15 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398854 SPO 2015 03 09 02 06 00 2760-99 P n2o CCGG 327.080 0.260 ... H4 2015 12 16 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398858 SPO 2015 03 09 02 06 00 364-99 P n2o CCGG 326.580 0.260 ... H4 2015 12 16 11 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398857 SPO 2015 03 16 20 14 00 1968-99 P n2o CCGG 327.010 0.260 ... H4 2015 12 16 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398860 SPO 2015 03 16 20 14 00 216-99 P n2o CCGG 327.040 0.260 ... H4 2015 12 16 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398859 SPO 2015 03 16 20 22 00 3287-99 S n2o CCGG 326.920 0.260 ... H4 2015 12 16 11 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398861 SPO 2015 03 16 20 22 00 4270-99 S n2o CCGG 326.790 0.260 ... H4 2015 12 16 12 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398862 SPO 2015 03 24 03 58 00 1269-99 P n2o CCGG 326.660 0.260 ... H4 2015 12 17 15 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398871 SPO 2015 03 24 03 58 00 1809-99 P n2o CCGG 327.040 0.260 ... H4 2015 12 17 15 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398872 SPO 2015 04 01 02 14 00 2991-99 P n2o CCGG 326.730 0.260 ... H4 2015 12 17 16 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398873 SPO 2015 04 01 02 14 00 3351-99 P n2o CCGG 326.530 0.260 ... H4 2015 12 17 16 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398874 SPO 2015 04 01 02 21 00 1321-99 S n2o CCGG 326.970 0.260 ... H4 2015 12 17 15 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398875 SPO 2015 04 01 02 21 00 4725-99 S n2o CCGG 326.600 0.260 ... H4 2015 12 17 16 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398876 SPO 2015 04 08 05 31 00 2384-99 P n2o CCGG 326.920 0.260 ... H4 2015 12 17 13 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398864 SPO 2015 04 08 05 31 00 667-99 P n2o CCGG 327.200 0.260 ... H4 2015 12 17 13 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398863 SPO 2015 04 15 03 11 00 2348-99 P n2o CCGG 326.520 0.260 ... H4 2015 12 17 15 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398866 SPO 2015 04 15 03 11 00 305-99 P n2o CCGG 326.680 0.260 ... H4 2015 12 17 14 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398865 SPO 2015 04 15 03 21 00 2759-99 S n2o CCGG 327.130 0.260 ... H4 2015 12 17 13 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398870 SPO 2015 04 15 03 21 00 813-99 S n2o CCGG 326.900 0.260 ... H4 2015 12 17 13 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398869 SPO 2015 04 24 03 27 00 3332-99 P n2o CCGG 326.940 0.260 ... H4 2015 12 17 14 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398867 SPO 2015 04 24 03 27 00 3511-99 P n2o CCGG 326.540 0.260 ... H4 2015 12 17 14 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398868 SPO 2015 05 01 22 20 00 2109-99 P n2o CCGG 326.820 0.260 ... H4 2015 12 17 10 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398839 SPO 2015 05 01 22 20 00 2110-99 P n2o CCGG 326.440 0.260 ... H4 2015 12 17 10 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398840 SPO 2015 05 01 22 25 00 5129-99 S n2o CCGG 326.330 0.260 ... H4 2015 12 16 16 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398845 SPO 2015 05 01 22 25 00 5130-99 S n2o CCGG 326.630 0.260 ... H4 2015 12 16 17 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398846 SPO 2015 05 08 05 40 00 4901-99 P n2o CCGG 327.030 0.260 ... H4 2015 12 17 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398841 SPO 2015 05 08 05 40 00 4902-99 P n2o CCGG 326.760 0.260 ... H4 2015 12 17 10 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398842 SPO 2015 05 15 04 21 00 1377-99 P n2o CCGG 326.990 0.260 ... H4 2015 12 10 09 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398831 SPO 2015 05 15 04 21 00 1378-99 P n2o CCGG 326.980 0.260 ... H4 2015 12 10 10 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398832 SPO 2015 05 15 04 24 00 1071-99 S n2o CCGG 327.180 0.260 ... H4 2015 12 17 11 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398843 SPO 2015 05 15 04 24 00 1072-99 S n2o CCGG 327.050 0.260 ... H4 2015 12 17 11 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398844 SPO 2015 05 24 04 59 00 1837-99 P n2o CCGG 326.920 0.260 ... H4 2015 12 10 10 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398833 SPO 2015 05 24 04 59 00 1838-99 P n2o CCGG 326.580 0.260 ... H4 2015 12 10 10 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398834 SPO 2015 06 01 05 18 00 1707-99 P n2o CCGG 326.400 0.260 ... H4 2015 12 10 11 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398835 SPO 2015 06 01 05 18 00 1708-99 P n2o CCGG 326.090 0.260 N.. H4 2015 12 10 11 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398836 SPO 2015 06 01 05 22 00 297-99 S n2o CCGG 326.700 0.260 ... H4 2015 12 10 11 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398837 SPO 2015 06 01 05 22 00 298-99 S n2o CCGG 327.020 0.260 ... H4 2015 12 10 11 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398838 SPO 2015 06 08 08 09 00 3719-99 P n2o CCGG 326.930 0.260 ... H4 2015 12 10 12 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398792 SPO 2015 06 08 08 09 00 3720-99 P n2o CCGG 326.880 0.260 ... H4 2015 12 10 12 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398793 SPO 2015 06 15 03 14 00 2769-99 P n2o CCGG 326.700 0.260 ... H4 2015 12 10 13 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398794 SPO 2015 06 15 03 14 00 2770-99 P n2o CCGG 326.590 0.260 ... H4 2015 12 10 13 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398795 SPO 2015 06 15 03 22 00 3601-99 S n2o CCGG 326.670 0.260 ... H4 2015 12 10 12 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398798 SPO 2015 06 15 03 22 00 3602-99 S n2o CCGG 326.790 0.260 ... H4 2015 12 10 12 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398799 SPO 2015 06 24 04 58 00 4997-99 P n2o CCGG 326.940 0.260 ... H4 2015 12 10 13 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398796 SPO 2015 06 24 04 58 00 4998-99 P n2o CCGG 327.000 0.260 ... H4 2015 12 10 13 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398797 SPO 2015 07 01 04 17 00 1527-99 P n2o CCGG 327.010 0.260 ... H4 2015 12 16 08 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398788 SPO 2015 07 01 04 17 00 1528-99 P n2o CCGG 326.920 0.260 ... H4 2015 12 16 09 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398789 SPO 2015 07 01 04 22 00 3233-99 S n2o CCGG 327.050 0.260 ... H4 2015 12 15 17 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398784 SPO 2015 07 01 04 22 00 3234-99 S n2o CCGG 327.160 0.260 ... H4 2015 12 15 17 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398785 SPO 2015 07 08 04 50 00 3677-99 P n2o CCGG 327.030 0.260 ... H4 2015 12 16 09 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398790 SPO 2015 07 08 04 50 00 3678-99 P n2o CCGG 326.930 0.260 ... H4 2015 12 16 09 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398791 SPO 2015 07 15 05 19 00 1264-99 P n2o CCGG 328.000 0.260 N.. H4 2015 12 11 10 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398808 SPO 2015 07 15 05 19 00 1426-99 P n2o CCGG 327.140 0.260 ... H4 2015 12 11 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398809 SPO 2015 07 15 05 22 00 3889-99 S n2o CCGG 327.260 0.260 ... H4 2015 12 16 09 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398786 SPO 2015 07 15 05 22 00 3890-99 S n2o CCGG 326.930 0.260 ... H4 2015 12 16 10 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398787 SPO 2015 07 24 04 43 00 2756-99 P n2o CCGG 327.290 0.260 ... H4 2015 12 11 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398810 SPO 2015 07 24 04 43 00 3497-99 P n2o CCGG 327.420 0.260 ... H4 2015 12 11 11 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398811 SPO 2015 08 02 04 01 00 1049-99 S n2o CCGG 327.700 0.260 ... H4 2015 12 11 11 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398814 SPO 2015 08 02 04 01 00 4350-99 S n2o CCGG 327.240 0.260 ... H4 2015 12 11 11 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398815 SPO 2015 08 02 04 12 00 1024-99 P n2o CCGG 327.320 0.260 ... H4 2015 12 11 11 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398812 SPO 2015 08 02 04 12 00 1671-99 P n2o CCGG 327.460 0.260 ... H4 2015 12 11 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398813 SPO 2015 08 08 05 12 00 4241-99 P n2o CCGG 327.350 0.260 ... H4 2015 12 14 12 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398802 SPO 2015 08 08 05 12 00 5205-99 P n2o CCGG 326.930 0.260 ... H4 2015 12 14 12 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398803 SPO 2015 08 15 05 12 00 3805-99 P n2o CCGG 327.100 0.260 ... H4 2015 12 15 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398800 SPO 2015 08 15 05 12 00 5336-99 P n2o CCGG 327.020 0.260 ... H4 2015 12 15 11 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398801 SPO 2015 08 15 05 16 00 2564-99 S n2o CCGG 327.290 0.260 ... H4 2015 12 14 13 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398806 SPO 2015 08 15 05 16 00 4045-99 S n2o CCGG 327.450 0.260 ... H4 2015 12 14 13 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398807 SPO 2015 08 24 08 22 00 1480-99 P n2o CCGG 327.340 0.260 ... H4 2015 12 15 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398804 SPO 2015 08 24 08 22 00 4319-99 P n2o CCGG 327.510 0.260 ... H4 2015 12 15 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398805 SPO 2015 09 01 02 10 00 1513-99 P n2o CCGG 327.390 0.260 ... H4 2015 12 11 12 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398768 SPO 2015 09 01 02 10 00 4619-99 P n2o CCGG 327.500 0.260 ... H4 2015 12 11 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398769 SPO 2015 09 01 02 15 00 1842-99 S n2o CCGG 327.530 0.260 ... H4 2015 12 11 12 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398774 SPO 2015 09 01 02 15 00 2734-99 S n2o CCGG 327.860 0.260 ... H4 2015 12 11 13 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398775 SPO 2015 09 08 01 57 00 1001-99 P n2o CCGG 327.510 0.260 ... H4 2015 12 11 13 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398770 SPO 2015 09 08 01 57 00 3060-99 P n2o CCGG 327.620 0.260 ... H4 2015 12 11 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398771 SPO 2015 09 16 00 15 00 1516-99 P n2o CCGG 327.230 0.260 ... H4 2015 12 16 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398776 SPO 2015 09 16 00 15 00 2866-99 P n2o CCGG 327.300 0.260 ... H4 2015 12 16 11 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398777 SPO 2015 09 16 00 20 00 2291-99 S n2o CCGG 327.930 0.260 ... H4 2015 12 11 14 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398773 SPO 2015 09 16 00 20 00 56-99 S n2o CCGG 327.670 0.260 ... H4 2015 12 11 14 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398772 SPO 2015 09 24 03 15 00 2070-99 P n2o CCGG 327.730 0.260 ... H4 2015 12 16 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398778 SPO 2015 09 24 03 15 00 2137-99 P n2o CCGG 327.820 0.260 ... H4 2015 12 16 13 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398779 SPO 2015 10 01 03 12 00 2186-99 P n2o CCGG 327.360 0.260 ... H4 2015 12 16 13 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398780 SPO 2015 10 01 03 12 00 5248-99 P n2o CCGG 327.630 0.260 ... H4 2015 12 16 13 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398781 SPO 2015 10 01 03 17 00 2988-99 S n2o CCGG 327.760 0.260 ... H4 2015 12 16 14 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398783 SPO 2015 10 01 03 17 00 997-99 S n2o CCGG 327.690 0.260 ... H4 2015 12 16 14 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398782 SPO 2015 10 08 01 20 00 5139-99 P n2o CCGG 327.660 0.260 ... H4 2015 12 14 10 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398823 SPO 2015 10 08 01 20 00 5140-99 P n2o CCGG 327.650 0.260 ... H4 2015 12 14 10 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398824 SPO 2015 10 18 04 10 00 5153-99 P n2o CCGG 327.710 0.260 ... H4 2015 12 14 11 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398825 SPO 2015 10 18 04 10 00 5154-99 P n2o CCGG 327.900 0.260 ... H4 2015 12 14 11 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398826 SPO 2015 10 18 04 18 00 2289-99 S n2o CCGG 327.580 0.260 ... H4 2015 12 14 11 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398829 SPO 2015 10 18 04 18 00 2290-99 S n2o CCGG 327.600 0.260 ... H4 2015 12 14 11 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398830 SPO 2015 10 24 03 04 00 4941-99 P n2o CCGG 327.640 0.260 ... H4 2015 12 14 12 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398827 SPO 2015 10 24 03 04 00 4942-99 P n2o CCGG 327.900 0.260 ... H4 2015 12 14 12 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398828 SPO 2015 11 01 01 11 00 1076-99 P n2o CCGG 327.760 0.260 ... H4 2015 12 28 11 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398820 SPO 2015 11 01 01 14 00 1521-99 S n2o CCGG 327.650 0.260 ... H4 2015 12 17 11 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398821 SPO 2015 11 01 01 14 00 1522-99 S n2o CCGG 327.980 0.260 ... H4 2015 12 17 11 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 398822 SPO 2015 11 08 00 20 00 883-99 P n2o CCGG 328.010 0.260 ... H4 2015 12 17 12 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398816 SPO 2015 11 08 00 20 00 884-99 P n2o CCGG 328.140 0.260 ... H4 2015 12 17 12 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398817 SPO 2015 11 15 00 20 00 1823-99 P n2o CCGG 327.790 0.260 ... H4 2015 12 17 12 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398818 SPO 2015 11 15 00 20 00 1824-99 P n2o CCGG 327.770 0.260 ... H4 2015 12 17 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 398819 SPO 2015 11 15 01 10 00 2411-99 S n2o CCGG 327.610 0.260 ... H4 2016 05 03 09 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406324 SPO 2015 11 15 01 10 00 2412-99 S n2o CCGG 327.930 0.260 ... H4 2016 05 03 09 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406325 SPO 2015 11 24 02 10 00 1733-99 P n2o CCGG 327.630 0.260 ... H4 2016 05 02 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406322 SPO 2015 11 24 02 10 00 1734-99 P n2o CCGG 327.450 0.260 ... H4 2016 05 02 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406323 SPO 2015 12 01 20 18 00 2739-99 P n2o CCGG 327.890 0.260 ... H4 2016 05 02 15 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406320 SPO 2015 12 01 20 18 00 2740-99 P n2o CCGG 327.750 0.260 ... H4 2016 05 02 15 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406321 SPO 2015 12 01 21 20 00 4169-99 S n2o CCGG 328.040 0.260 ... H4 2016 05 02 14 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406327 SPO 2015 12 01 21 20 00 4170-99 S n2o CCGG 327.890 0.260 ... H4 2016 05 02 15 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406326 SPO 2015 12 08 20 08 00 1543-99 P n2o CCGG 327.300 0.260 A.. H4 2016 05 02 13 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406348 SPO 2015 12 08 20 08 00 1544-99 P n2o CCGG 327.960 0.260 ... H4 2016 05 02 14 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406349 SPO 2015 12 15 01 11 00 3133-99 P n2o CCGG 327.570 0.260 ... H4 2016 05 02 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406346 SPO 2015 12 15 01 11 00 3134-99 P n2o CCGG 327.930 0.260 ... H4 2016 05 02 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406347 SPO 2015 12 15 01 20 00 655-99 S n2o CCGG 327.670 0.260 ... H4 2016 05 02 13 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406350 SPO 2015 12 15 01 20 00 656-99 S n2o CCGG 327.810 0.260 ... H4 2016 05 02 13 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406351 SPO 2015 12 24 01 10 00 705-99 P n2o CCGG 328.130 0.260 ... H4 2016 05 02 12 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406344 SPO 2015 12 24 01 10 00 706-99 P n2o CCGG 327.910 0.260 ... H4 2016 05 02 12 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406345 SPO 2016 01 04 03 15 00 1476-99 P n2o CCGG 328.200 0.260 ... H4 2016 05 03 10 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406338 SPO 2016 01 04 03 15 00 740-99 P n2o CCGG 327.990 0.260 ... H4 2016 05 03 09 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406339 SPO 2016 01 04 03 23 00 1471-99 S n2o CCGG 328.080 0.260 ... H4 2016 05 02 10 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406329 SPO 2016 01 04 03 23 00 4280-99 S n2o CCGG 328.070 0.260 ... H4 2016 05 02 10 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406328 SPO 2016 01 09 20 15 00 4334-99 P n2o CCGG 327.880 0.260 ... H4 2016 05 02 10 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406332 SPO 2016 01 09 20 15 00 4835-99 P n2o CCGG 328.100 0.260 ... H4 2016 05 02 10 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406333 SPO 2016 01 18 21 31 00 2903-99 S n2o CCGG 328.140 0.260 ... H4 2016 05 02 11 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406330 SPO 2016 01 18 21 31 00 5192-99 S n2o CCGG 328.040 0.260 ... H4 2016 05 02 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406331 SPO 2016 01 18 21 47 00 1236-99 P n2o CCGG 328.380 0.260 ... H4 2016 05 03 10 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406340 SPO 2016 01 18 21 47 00 1577-99 P n2o CCGG 327.980 0.260 ... H4 2016 05 03 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406341 SPO 2016 01 26 23 25 00 1488-99 P n2o CCGG 327.620 0.260 ... H4 2016 05 02 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406334 SPO 2016 01 26 23 25 00 2185-99 P n2o CCGG 328.090 0.260 ... H4 2016 05 02 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406335 SPO 2016 01 31 21 23 00 1672-99 P n2o CCGG 327.980 0.260 ... H4 2016 05 03 11 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406336 SPO 2016 01 31 21 23 00 4757-99 P n2o CCGG 328.010 0.260 ... H4 2016 05 03 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 406337 SPO 2016 01 31 21 24 00 1327-99 S n2o CCGG 328.360 0.260 ... H4 2016 05 03 11 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406342 SPO 2016 01 31 21 24 00 4944-99 S n2o CCGG 327.500 0.260 ... H4 2016 05 03 10 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 406343 SPO 2016 02 09 01 15 00 4783-99 P n2o CCGG 327.650 0.260 ... H4 2016 12 15 15 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418356 SPO 2016 02 09 01 15 00 5045-99 P n2o CCGG 327.620 0.260 ... H4 2016 12 15 15 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418357 SPO 2016 02 15 23 15 00 1955-99 P n2o CCGG 327.820 0.260 ... H4 2016 12 21 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418336 SPO 2016 02 15 23 15 00 4141-99 P n2o CCGG 327.730 0.260 ... H4 2016 12 21 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418337 SPO 2016 02 15 23 20 00 3969-99 S n2o CCGG 327.740 0.260 ... H4 2016 12 21 12 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418338 SPO 2016 02 15 23 20 00 4522-99 S n2o CCGG 327.450 0.260 ... H4 2016 12 21 11 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418339 SPO 2016 02 25 00 41 00 3092-99 P n2o CCGG 327.660 0.260 ... H4 2016 12 21 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418334 SPO 2016 02 25 00 41 00 601-99 P n2o CCGG 328.080 0.260 ... H4 2016 12 21 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418335 SPO 2016 03 01 21 12 00 1207-99 P n2o CCGG 327.150 0.260 ... H4 2016 12 21 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418332 SPO 2016 03 01 21 12 00 257-99 P n2o CCGG 326.800 0.260 ... H4 2016 12 21 10 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418333 SPO 2016 03 01 21 17 00 1283-99 S n2o CCGG 327.280 0.260 ... H4 2016 12 23 11 24 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418288 SPO 2016 03 01 21 17 00 5348-99 S n2o CCGG 327.260 0.260 ... H4 2016 12 23 11 08 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418289 SPO 2016 03 08 01 20 00 4739-99 P n2o CCGG 327.040 0.260 ... H4 2016 12 16 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418222 SPO 2016 03 08 01 20 00 4956-99 P n2o CCGG 327.080 0.260 ... H4 2016 12 16 10 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418223 SPO 2016 03 15 22 15 00 4357-99 S n2o CCGG 327.450 0.260 ... H4 2016 12 21 09 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418210 SPO 2016 03 15 22 17 00 3448-99 P n2o CCGG 327.150 0.260 ... H4 2016 12 16 10 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418220 SPO 2016 03 15 22 17 00 4291-99 P n2o CCGG 327.500 0.260 ... H4 2016 12 16 10 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418221 SPO 2016 03 24 22 00 00 4363-99 P n2o CCGG 327.350 0.260 ... H4 2016 12 22 10 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418324 SPO 2016 03 24 22 00 00 874-99 P n2o CCGG 327.070 0.260 ... H4 2016 12 22 10 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418325 SPO 2016 04 02 22 15 00 4208-99 S n2o CCGG 327.170 0.260 ... H4 2016 12 22 09 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418330 SPO 2016 04 02 22 15 00 5325-99 S n2o CCGG 327.500 0.260 ... H4 2016 12 22 10 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418331 SPO 2016 04 02 22 18 00 3255-99 P n2o CCGG 327.740 0.260 ... H4 2016 12 16 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418219 SPO 2016 04 02 22 18 00 3321-99 P n2o CCGG 327.470 0.260 ... H4 2016 12 16 09 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418218 SPO 2016 04 09 23 40 00 2852-99 P n2o CCGG 327.670 0.260 ... H4 2016 12 21 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418326 SPO 2016 04 09 23 40 00 3880-99 P n2o CCGG 327.430 0.260 ... H4 2016 12 21 15 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418327 SPO 2016 04 15 23 12 00 1189-99 S n2o CCGG 327.320 0.260 ... H4 2016 12 21 14 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418298 SPO 2016 04 15 23 12 00 5262-99 S n2o CCGG 327.130 0.260 ... H4 2016 12 21 14 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418299 SPO 2016 04 15 23 15 00 2845-99 P n2o CCGG 327.200 0.260 ... H4 2016 12 22 09 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418328 SPO 2016 04 15 23 15 00 638-99 P n2o CCGG 327.280 0.260 ... H4 2016 12 22 09 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418329 SPO 2016 04 25 00 12 00 2873-99 P n2o CCGG 327.250 0.260 ... H4 2016 12 21 16 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418302 SPO 2016 04 25 00 12 00 803-99 P n2o CCGG 327.240 0.260 ... H4 2016 12 21 16 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418303 SPO 2016 05 01 23 11 00 1563-99 S n2o CCGG 327.560 0.260 ... H4 2016 12 21 16 10 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418300 SPO 2016 05 01 23 11 00 3614-99 S n2o CCGG 327.260 0.260 ... H4 2016 12 21 16 26 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418301 SPO 2016 05 01 23 15 00 3758-99 P n2o CCGG 326.950 0.260 ... H4 2016 12 22 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418294 SPO 2016 05 01 23 15 00 4886-99 P n2o CCGG 327.220 0.260 ... H4 2016 12 22 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418295 SPO 2016 05 08 22 48 00 1324-99 P n2o CCGG 327.010 0.260 ... H4 2016 12 22 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418292 SPO 2016 05 08 22 48 00 2257-99 P n2o CCGG 326.940 0.260 ... H4 2016 12 22 10 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418293 SPO 2016 05 16 21 10 00 1648-99 P n2o CCGG 327.510 0.260 ... H4 2016 12 20 14 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418254 SPO 2016 05 16 21 10 00 3352-99 P n2o CCGG 327.410 0.260 ... H4 2016 12 20 14 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418255 SPO 2016 05 16 21 18 00 1089-99 S n2o CCGG 327.410 0.260 ... H4 2016 12 22 12 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418296 SPO 2016 05 16 21 18 00 1778-99 S n2o CCGG 327.060 0.260 ... H4 2016 12 22 11 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418297 SPO 2016 05 24 22 01 00 1323-99 P n2o CCGG 327.330 0.260 ... H4 2016 12 22 11 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418290 SPO 2016 05 24 22 01 00 4591-99 P n2o CCGG 327.540 0.260 ... H4 2016 12 22 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418291 SPO 2016 06 01 23 15 00 5275-99 S n2o CCGG 327.320 0.260 ... H4 2016 12 20 11 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418316 SPO 2016 06 01 23 15 00 5276-99 S n2o CCGG 327.480 0.260 ... H4 2016 12 20 11 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418317 SPO 2016 06 01 23 21 00 397-99 P n2o CCGG 327.430 0.260 ... H4 2016 12 20 11 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418320 SPO 2016 06 01 23 21 00 398-99 P n2o CCGG 327.490 0.260 ... H4 2016 12 20 11 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418321 SPO 2016 06 07 23 01 00 3393-99 P n2o CCGG 327.180 0.260 ... H4 2016 12 19 16 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418258 SPO 2016 06 07 23 01 00 3394-99 P n2o CCGG 327.550 0.260 ... H4 2016 12 19 17 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418259 SPO 2016 06 15 22 12 00 133-99 P n2o CCGG 326.950 0.260 ... H4 2016 12 19 15 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418262 SPO 2016 06 15 22 12 00 134-99 P n2o CCGG 327.240 0.260 ... H4 2016 12 19 16 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418263 SPO 2016 06 15 22 20 00 2285-99 S n2o CCGG 327.260 0.260 ... H4 2016 12 19 17 23 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418318 SPO 2016 06 15 22 20 00 2286-99 S n2o CCGG 327.390 0.260 ... H4 2016 12 19 17 39 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418319 SPO 2016 06 24 22 36 00 1735-99 P n2o CCGG 327.010 0.260 ... H4 2016 12 19 16 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418260 SPO 2016 06 24 22 36 00 1736-99 P n2o CCGG 326.530 0.260 ... H4 2016 12 19 16 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418261 SPO 2016 07 01 22 21 00 2551-99 S n2o CCGG 327.690 0.260 ... H4 2016 12 19 15 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418264 SPO 2016 07 01 22 21 00 2552-99 S n2o CCGG 327.290 0.260 ... H4 2016 12 19 15 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418265 SPO 2016 07 01 22 30 00 291-99 P n2o CCGG 327.190 0.260 ... H4 2016 12 21 09 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418217 SPO 2016 07 08 22 10 00 1554-99 P n2o CCGG 327.890 0.260 ... H4 2016 12 19 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418343 SPO 2016 07 08 22 10 00 338-99 P n2o CCGG 327.450 0.260 ... H4 2016 12 19 13 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418342 SPO 2016 07 15 22 11 00 1073-99 P n2o CCGG 327.760 0.260 ... H4 2016 12 21 09 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418215 SPO 2016 07 15 22 11 00 1129-99 P n2o CCGG 327.270 0.260 ... H4 2016 12 21 10 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418216 SPO 2016 07 15 22 17 00 5054-99 S n2o CCGG 327.300 0.260 ... H4 2016 12 19 12 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418347 SPO 2016 07 15 22 17 00 65-99 S n2o CCGG 327.260 0.260 ... H4 2016 12 19 12 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418346 SPO 2016 07 24 23 05 00 2526-99 P n2o CCGG 327.410 0.260 ... H4 2016 12 21 09 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418214 SPO 2016 07 24 23 05 00 947-99 P n2o CCGG 327.490 0.260 ... H4 2016 12 21 08 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418213 SPO 2016 08 01 23 18 00 1306-99 P n2o CCGG 327.710 0.260 ... H4 2016 12 21 08 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418212 SPO 2016 08 01 23 18 00 502-99 P n2o CCGG 327.600 0.260 ... H4 2016 12 21 08 15 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418211 SPO 2016 08 01 23 20 00 1166-99 S n2o CCGG 327.980 0.260 ... H4 2016 12 19 11 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418344 SPO 2016 08 01 23 20 00 2641-99 S n2o CCGG 327.110 0.260 ... H4 2016 12 19 11 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418345 SPO 2016 08 08 22 31 00 1877-99 P n2o CCGG 327.430 0.260 ... H4 2016 12 19 11 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418340 SPO 2016 08 08 22 31 00 765-99 P n2o CCGG 327.730 0.260 ... H4 2016 12 19 11 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418341 SPO 2016 08 15 22 13 00 3226-99 P n2o CCGG 327.720 0.260 ... H4 2016 12 16 11 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418224 SPO 2016 08 15 22 13 00 3543-99 P n2o CCGG 328.100 0.260 ... H4 2016 12 16 11 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418225 SPO 2016 08 15 22 18 00 1827-99 S n2o CCGG 327.520 0.260 ... H4 2016 12 20 13 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418256 SPO 2016 08 15 22 18 00 4918-99 S n2o CCGG 327.530 0.260 ... H4 2016 12 20 13 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418257 SPO 2016 08 24 21 46 00 2777-99 P n2o CCGG 328.140 0.260 ... H4 2016 12 21 13 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418308 SPO 2016 08 24 21 46 00 4054-99 P n2o CCGG 327.850 0.260 ... H4 2016 12 21 13 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418309 SPO 2016 09 01 21 09 00 3705-99 P n2o CCGG 327.560 0.260 ... H4 2016 12 20 13 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418252 SPO 2016 09 01 21 09 00 4961-99 P n2o CCGG 327.890 0.260 ... H4 2016 12 20 13 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418253 SPO 2016 09 01 21 15 00 1760-99 S n2o CCGG 328.280 0.260 ... H4 2016 12 21 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418310 SPO 2016 09 01 21 15 00 4711-99 S n2o CCGG 328.010 0.260 ... H4 2016 12 21 13 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418311 SPO 2016 09 08 23 07 00 2058-99 P n2o CCGG 328.110 0.260 ... H4 2016 12 21 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418306 SPO 2016 09 08 23 07 00 3893-99 P n2o CCGG 328.090 0.260 ... H4 2016 12 21 12 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418307 SPO 2016 09 15 02 15 00 1689-99 P n2o CCGG 328.210 0.260 ... H4 2016 12 20 12 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418250 SPO 2016 09 15 02 15 00 2534-99 P n2o CCGG 327.880 0.260 ... H4 2016 12 20 12 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418251 SPO 2016 09 15 02 20 00 4427-99 S n2o CCGG 327.860 0.260 ... H4 2016 12 21 14 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418312 SPO 2016 09 15 02 20 00 4590-99 S n2o CCGG 328.230 0.260 ... H4 2016 12 21 14 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418313 SPO 2016 09 24 21 11 00 4112-99 P n2o CCGG 327.820 0.260 ... H4 2016 12 16 15 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418209 SPO 2016 09 24 21 11 00 902-99 P n2o CCGG 326.740 0.260 A.. H4 2016 12 16 15 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418208 SPO 2016 10 01 20 11 00 1440-99 P n2o CCGG 328.050 0.260 ... H4 2016 12 20 16 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418280 SPO 2016 10 01 20 11 00 2525-99 P n2o CCGG 328.280 0.260 ... H4 2016 12 20 16 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418281 SPO 2016 10 01 20 16 00 3113-99 S n2o CCGG 328.270 0.260 ... H4 2016 12 23 10 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418286 SPO 2016 10 01 20 16 00 3996-99 S n2o CCGG 328.330 0.260 ... H4 2016 12 23 10 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418287 SPO 2016 10 08 20 18 00 3793-99 P n2o CCGG 327.540 0.260 ... H4 2016 12 20 16 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418278 SPO 2016 10 08 20 18 00 732-99 P n2o CCGG 328.620 0.260 ... H4 2016 12 20 15 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418279 SPO 2016 10 15 20 12 00 383-99 S n2o CCGG 327.890 0.260 ... H4 2016 12 23 10 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418284 SPO 2016 10 15 20 12 00 5108-99 S n2o CCGG 327.680 0.260 ... H4 2016 12 23 10 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418285 SPO 2016 10 15 20 14 00 1288-99 P n2o CCGG 328.140 0.260 ... H4 2016 12 20 15 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418276 SPO 2016 10 15 20 14 00 5357-99 P n2o CCGG 328.230 0.260 ... H4 2016 12 20 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418277 SPO 2016 10 24 21 44 00 2682-99 P n2o CCGG 328.400 0.260 ... H4 2016 12 23 09 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418282 SPO 2016 10 24 21 44 00 408-99 P n2o CCGG 328.240 0.260 ... H4 2016 12 23 09 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418283 SPO 2016 11 01 22 14 00 3716-99 P n2o CCGG 328.480 0.260 ... H4 2016 12 21 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418304 SPO 2016 11 01 22 14 00 4695-99 P n2o CCGG 328.320 0.260 ... H4 2016 12 21 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 418305 SPO 2016 11 01 22 22 00 2449-99 S n2o CCGG 327.760 0.260 ... H4 2016 12 20 14 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418274 SPO 2016 11 01 22 22 00 4548-99 S n2o CCGG 328.230 0.260 ... H4 2016 12 20 15 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 418275 SPO 2016 11 10 05 07 00 2664-99 P n2o CCGG 327.580 0.260 ... H4 2017 02 10 15 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420570 SPO 2016 11 10 05 07 00 708-99 P n2o CCGG 327.960 0.260 ... H4 2017 02 10 14 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420569 SPO 2016 11 15 22 13 00 2029-99 P n2o CCGG 327.360 0.260 ... H4 2017 02 10 14 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420567 SPO 2016 11 15 22 13 00 3581-99 P n2o CCGG 327.920 0.260 ... H4 2017 02 10 14 41 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420568 SPO 2016 11 15 22 14 00 401-99 S n2o CCGG 328.290 0.260 ... H4 2017 02 15 09 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420577 SPO 2016 11 15 22 14 00 698-99 S n2o CCGG 328.330 0.260 ... H4 2017 02 15 10 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420578 SPO 2016 11 24 02 15 00 1070-99 P n2o CCGG 328.070 0.260 ... H4 2017 02 15 09 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420575 SPO 2016 11 24 02 15 00 2116-99 P n2o CCGG 328.130 0.260 ... H4 2017 02 15 09 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420576 SPO 2016 12 01 20 14 00 4789-99 P n2o CCGG 328.140 0.260 ... H4 2017 02 10 13 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420565 SPO 2016 12 01 20 14 00 5196-99 P n2o CCGG 328.390 0.260 ... H4 2017 02 10 13 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420566 SPO 2016 12 01 20 21 00 1354-99 S n2o CCGG 328.730 0.260 ... H4 2017 02 14 16 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420574 SPO 2016 12 01 20 21 00 2957-99 S n2o CCGG 328.470 0.260 ... H4 2017 02 14 16 31 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420573 SPO 2016 12 08 02 40 00 1239-99 P n2o CCGG 328.150 0.260 ... H4 2017 02 10 12 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420563 SPO 2016 12 08 02 40 00 3699-99 P n2o CCGG 327.240 0.260 ... H4 2017 02 10 13 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 420564 SPO 2016 12 15 02 15 00 1724-99 S n2o CCGG 328.410 0.260 ... H4 2017 02 14 16 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420572 SPO 2016 12 15 02 15 00 4302-99 S n2o CCGG 328.380 0.260 ... H4 2017 02 14 15 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 420571 SPO 2016 12 15 02 31 00 2672-99 P n2o CCGG 328.400 0.430 ... H4 2018 01 04 11 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436499 SPO 2016 12 15 02 31 00 833-99 P n2o CCGG 328.010 0.430 ... H4 2018 01 04 11 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436500 SPO 2016 12 25 20 19 00 2768-99 P n2o CCGG 327.180 0.430 ... H4 2018 01 09 09 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436491 SPO 2016 12 25 20 19 00 4131-99 P n2o CCGG 327.900 0.430 ... H4 2018 01 09 09 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436492 SPO 2017 01 01 20 17 00 2816-99 P n2o CCGG 328.370 0.430 ... H4 2018 01 09 10 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436493 SPO 2017 01 01 20 17 00 4275-99 P n2o CCGG 327.350 0.430 ... H4 2018 01 09 10 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436494 SPO 2017 01 01 20 21 00 1618-99 S n2o CCGG 327.910 0.430 ... H4 2018 01 04 10 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436505 SPO 2017 01 01 20 21 00 2007-99 S n2o CCGG 328.950 0.430 ... H4 2018 01 04 09 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436506 SPO 2017 01 08 21 31 00 3325-99 P n2o CCGG 327.930 0.430 ... H4 2018 01 04 09 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436501 SPO 2017 01 08 21 31 00 3868-99 P n2o CCGG 328.210 0.430 ... H4 2018 01 04 09 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436502 SPO 2017 01 16 02 18 00 5113-99 P n2o CCGG 328.190 0.430 ... H4 2018 01 09 08 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436495 SPO 2017 01 16 02 18 00 978-99 P n2o CCGG 327.830 0.430 ... H4 2018 01 09 08 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436496 SPO 2017 01 16 02 20 00 2859-99 S n2o CCGG 327.460 0.430 ... H4 2018 01 09 09 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436497 SPO 2017 01 16 02 20 00 45-99 S n2o CCGG 328.260 0.430 ... H4 2018 01 09 09 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436498 SPO 2017 01 24 22 17 00 4653-99 P n2o CCGG 326.790 0.430 A.. H4 2018 01 04 09 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436503 SPO 2017 01 24 22 17 00 927-99 P n2o CCGG 328.300 0.430 A.. H4 2018 01 04 08 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436504 SPO 2017 02 01 20 12 00 1900-99 P n2o CCGG 328.480 0.430 ... H4 2018 01 05 08 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436523 SPO 2017 02 01 20 12 00 2856-99 P n2o CCGG 328.680 0.430 ... H4 2018 01 05 08 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436524 SPO 2017 02 01 20 20 00 2726-99 S n2o CCGG 327.800 0.430 ... H4 2018 01 05 10 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436537 SPO 2017 02 01 20 20 00 5335-99 S n2o CCGG 327.770 0.430 ... H4 2018 01 05 10 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436538 SPO 2017 02 09 01 06 00 4209-99 P n2o CCGG 327.890 0.430 ... H4 2018 01 05 09 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436525 SPO 2017 02 09 01 06 00 4935-99 P n2o CCGG 326.330 0.430 A.. H4 2018 01 05 09 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436526 SPO 2017 02 15 21 15 00 3240-99 P n2o CCGG 327.350 0.430 ... H4 2018 01 05 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436533 SPO 2017 02 15 21 15 00 4079-99 P n2o CCGG 327.110 0.430 ... H4 2018 01 05 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436534 SPO 2017 02 15 21 20 00 1793-99 S n2o CCGG 327.280 0.430 ... H4 2018 01 05 11 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436535 SPO 2017 02 15 21 20 00 314-99 S n2o CCGG 327.890 0.430 ... H4 2018 01 05 11 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436536 SPO 2017 02 24 01 01 00 2642-99 P n2o CCGG 327.490 0.430 ... H4 2018 01 05 09 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436527 SPO 2017 02 24 01 01 00 556-99 P n2o CCGG 328.040 0.430 ... H4 2018 01 05 09 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436528 SPO 2017 03 01 01 09 00 303-99 P n2o CCGG 327.670 0.430 ... H4 2018 01 05 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436531 SPO 2017 03 01 01 09 00 3583-99 P n2o CCGG 327.510 0.430 ... H4 2018 01 05 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436532 SPO 2017 03 01 01 15 00 3367-99 S n2o CCGG 327.820 0.430 ... H4 2018 01 05 10 21 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436529 SPO 2017 03 01 01 15 00 4439-99 S n2o CCGG 327.420 0.430 ... H4 2018 01 05 10 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436530 SPO 2017 03 08 00 46 00 3687-99 P n2o CCGG 328.120 0.430 ... H4 2018 01 09 12 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436435 SPO 2017 03 08 00 46 00 5053-99 P n2o CCGG 328.750 0.430 ... H4 2018 01 09 12 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436436 SPO 2017 03 15 22 14 00 1422-99 P n2o CCGG 328.120 0.430 ... H4 2018 01 09 15 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436427 SPO 2017 03 15 22 14 00 1481-99 P n2o CCGG 327.070 0.430 ... H4 2018 01 09 15 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436428 SPO 2017 03 15 22 20 00 1637-99 S n2o CCGG 327.370 0.430 ... H4 2018 01 09 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436433 SPO 2017 03 15 22 20 00 5212-99 S n2o CCGG 328.170 0.430 ... H4 2018 01 09 14 06 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436434 SPO 2017 03 24 22 59 00 2189-99 P n2o CCGG 327.660 0.430 ... H4 2018 01 09 11 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436437 SPO 2017 03 24 22 59 00 5223-99 P n2o CCGG 327.310 0.430 ... H4 2018 01 09 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436438 SPO 2017 04 01 01 17 00 2346-99 S n2o CCGG 327.120 0.430 ... H4 2018 01 09 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436441 SPO 2017 04 01 01 17 00 4105-99 S n2o CCGG 327.230 0.430 ... H4 2018 01 09 11 28 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436442 SPO 2017 04 01 01 19 00 2989-99 P n2o CCGG 327.780 0.430 ... H4 2018 01 09 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436429 SPO 2017 04 01 01 19 00 4280-99 P n2o CCGG 327.110 0.430 ... H4 2018 01 09 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436430 SPO 2017 04 10 22 48 00 1275-99 P n2o CCGG 327.140 0.430 ... H4 2018 01 09 12 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436431 SPO 2017 04 10 22 48 00 2103-99 P n2o CCGG 327.600 0.430 ... H4 2018 01 09 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436432 SPO 2017 04 17 03 09 00 4751-99 P n2o CCGG 327.000 0.430 .X. H4 2018 01 09 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436439 SPO 2017 04 17 03 09 00 5395-99 P n2o CCGG 326.460 0.430 .X. H4 2018 01 09 10 56 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436440 SPO 2017 04 17 03 16 00 165-99 S n2o CCGG 328.040 0.430 ... H4 2018 01 04 15 25 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436481 SPO 2017 04 17 03 16 00 166-99 S n2o CCGG 328.480 0.430 ... H4 2018 01 04 15 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436482 SPO 2017 04 24 23 17 00 1051-99 P n2o CCGG 328.070 0.430 ... H4 2018 01 08 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436483 SPO 2017 04 24 23 17 00 1052-99 P n2o CCGG 327.920 0.430 ... H4 2018 01 08 14 34 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436484 SPO 2017 05 03 21 12 00 3947-99 P n2o CCGG 327.360 0.430 ... H4 2018 01 04 14 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436479 SPO 2017 05 03 21 12 00 3948-99 P n2o CCGG 327.250 0.430 ... H4 2018 01 04 15 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436480 SPO 2017 05 03 21 20 00 3477-99 S n2o CCGG 327.980 0.430 ... H4 2018 01 08 15 54 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436489 SPO 2017 05 03 21 20 00 3478-99 S n2o CCGG 327.680 0.430 ... H4 2018 01 08 16 09 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436490 SPO 2017 05 10 03 48 00 3569-99 P n2o CCGG 326.550 0.430 ... H4 2018 01 04 14 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436477 SPO 2017 05 10 03 48 00 3570-99 P n2o CCGG 327.770 0.430 ... H4 2018 01 04 14 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436478 SPO 2017 05 17 02 15 00 5269-99 P n2o CCGG 328.090 0.430 ... H4 2018 01 04 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436475 SPO 2017 05 17 02 15 00 5270-99 P n2o CCGG 327.810 0.430 ... H4 2018 01 04 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436476 SPO 2017 05 17 02 18 00 1521-99 S n2o CCGG 329.050 0.430 .X. H4 2018 01 08 15 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436487 SPO 2017 05 17 02 18 00 1522-99 S n2o CCGG 328.270 0.430 .X. H4 2018 01 08 15 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436488 SPO 2017 05 24 02 10 00 1399-99 P n2o CCGG 328.240 0.430 ... H4 2018 01 08 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436485 SPO 2017 05 24 02 10 00 1400-99 P n2o CCGG 326.990 0.430 ... H4 2018 01 08 15 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436486 SPO 2017 06 01 23 11 00 1473-99 P n2o CCGG 328.580 0.430 ... H4 2018 01 09 16 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436515 SPO 2017 06 01 23 11 00 4231-99 P n2o CCGG 326.950 0.430 A.. H4 2018 01 09 17 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436516 SPO 2017 06 01 23 17 00 414-99 S n2o CCGG 327.090 0.430 ... H4 2018 01 08 13 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436513 SPO 2017 06 01 23 17 00 891-99 S n2o CCGG 327.880 0.430 ... H4 2018 01 08 13 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436514 SPO 2017 06 08 04 10 00 4867-99 P n2o CCGG 327.900 0.430 ... H4 2018 01 08 12 57 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436507 SPO 2017 06 08 04 10 00 5385-99 P n2o CCGG 327.920 0.430 ... H4 2018 01 08 13 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436508 SPO 2017 06 15 14 11 00 4980-99 S n2o CCGG 328.840 0.430 ... H4 2018 01 09 16 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436519 SPO 2017 06 15 14 11 00 5288-99 S n2o CCGG 328.560 0.430 ... H4 2018 01 09 16 29 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436520 SPO 2017 06 15 14 43 00 1615-99 P n2o CCGG 328.420 0.430 ... H4 2018 01 08 12 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436509 SPO 2017 06 15 14 43 00 1638-99 P n2o CCGG 327.750 0.430 ... H4 2018 01 08 12 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436510 SPO 2017 06 25 06 30 00 251-99 P n2o CCGG 328.380 0.430 ... H4 2018 01 09 14 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436517 SPO 2017 06 25 06 30 00 5663-99 P n2o CCGG 328.470 0.430 ... H4 2018 01 09 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436518 SPO 2017 07 03 22 16 00 1731-99 P n2o CCGG 328.880 0.430 ... H4 2018 01 08 11 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436511 SPO 2017 07 03 22 16 00 5445-99 P n2o CCGG 327.770 0.430 ... H4 2018 01 08 12 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436512 SPO 2017 07 03 23 20 00 1642-99 S n2o CCGG 328.120 0.430 ... H4 2018 01 09 15 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436521 SPO 2017 07 03 23 20 00 456-99 S n2o CCGG 328.720 0.430 ... H4 2018 01 09 15 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436522 SPO 2017 07 07 22 21 00 1470-99 P n2o CCGG 328.270 0.430 ... H4 2018 01 04 10 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436451 SPO 2017 07 07 22 21 00 3116-99 P n2o CCGG 327.780 0.430 ... H4 2018 01 04 10 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436452 SPO 2017 07 15 03 16 00 4795-99 P n2o CCGG 328.660 0.430 ... H4 2018 01 03 15 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436453 SPO 2017 07 15 03 16 00 579-99 P n2o CCGG 327.630 0.430 A.. H4 2018 01 03 14 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436454 SPO 2017 07 15 03 18 00 1094-99 S n2o CCGG 327.830 0.430 ... H4 2018 01 04 13 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436449 SPO 2017 07 15 03 18 00 2084-99 S n2o CCGG 328.740 0.430 ... H4 2018 01 04 13 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436450 SPO 2017 07 24 01 50 00 1395-99 P n2o CCGG 328.580 0.430 ... H4 2018 01 04 11 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436444 SPO 2017 07 24 01 50 00 799-99 P n2o CCGG 327.220 0.430 A.. H4 2018 01 04 11 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436443 SPO 2017 08 01 03 11 00 2187-99 S n2o CCGG 329.140 0.430 ... H4 2018 01 04 12 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436447 SPO 2017 08 01 03 11 00 2555-99 S n2o CCGG 328.910 0.430 ... H4 2018 01 04 13 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436448 SPO 2017 08 01 03 11 00 4354-99 P n2o CCGG 328.690 0.430 ... H4 2018 01 03 14 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436455 SPO 2017 08 01 03 11 00 542-99 P n2o CCGG 328.330 0.430 ... H4 2018 01 03 14 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436456 SPO 2017 08 08 22 31 00 2503-99 P n2o CCGG 327.480 0.430 A.. H4 2018 01 04 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436445 SPO 2017 08 08 22 31 00 4448-99 P n2o CCGG 329.090 0.430 A.. H4 2018 01 04 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436446 SPO 2017 08 15 03 14 00 2166-99 P n2o CCGG 328.420 0.430 ... H4 2018 01 03 13 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436457 SPO 2017 08 15 03 14 00 910-99 P n2o CCGG 328.630 0.430 ... H4 2018 01 03 13 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436458 SPO 2017 08 15 03 15 00 1818-99 S n2o CCGG 328.380 0.430 ... H4 2018 01 08 11 38 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436547 SPO 2017 08 15 03 15 00 746-99 S n2o CCGG 328.400 0.430 ... H4 2018 01 08 11 22 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436548 SPO 2017 08 24 22 25 00 4265-99 P n2o CCGG 328.770 0.430 ... H4 2018 01 05 14 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436545 SPO 2017 08 24 22 25 00 4617-99 P n2o CCGG 329.380 0.430 ... H4 2018 01 05 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436546 SPO 2017 09 01 02 11 00 2710-99 P n2o CCGG 328.630 0.430 ... H4 2018 01 05 14 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436541 SPO 2017 09 01 02 11 00 754-99 P n2o CCGG 328.540 0.430 ... H4 2018 01 05 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436542 SPO 2017 09 01 02 13 00 3225-99 S n2o CCGG 328.550 0.430 ... H4 2018 01 08 10 35 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436550 SPO 2017 09 01 02 13 00 949-99 S n2o CCGG 328.600 0.430 ... H4 2018 01 08 10 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436549 SPO 2017 09 08 03 20 00 2067-99 P n2o CCGG 329.220 0.430 ... H4 2018 01 05 13 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436543 SPO 2017 09 08 03 20 00 5515-99 P n2o CCGG 328.510 0.430 ... H4 2018 01 05 13 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436544 SPO 2017 09 15 02 08 00 1596-99 P n2o CCGG 328.640 0.430 ... H4 2018 01 08 10 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436551 SPO 2017 09 15 02 08 00 3525-99 P n2o CCGG 328.480 0.430 ... H4 2018 01 08 11 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436552 SPO 2017 09 15 02 12 00 1631-99 S n2o CCGG 329.400 0.430 ... H4 2018 01 05 12 44 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436539 SPO 2017 09 15 02 12 00 4201-99 S n2o CCGG 328.980 0.430 ... H4 2018 01 05 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436540 SPO 2017 09 24 21 41 00 1866-99 P n2o CCGG 328.960 0.430 ... H4 2018 01 05 16 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436553 SPO 2017 09 24 21 41 00 3524-99 P n2o CCGG 329.430 0.430 ... H4 2018 01 05 17 13 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436554 SPO 2017 10 01 01 14 00 1651-99 P n2o CCGG 329.460 0.430 ... H4 2018 01 05 16 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436459 SPO 2017 10 01 01 14 00 1652-99 P n2o CCGG 328.600 0.430 ... H4 2018 01 05 16 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436460 SPO 2017 10 01 01 17 00 3453-99 S n2o CCGG 328.720 0.430 A.. H4 2018 01 03 10 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436473 SPO 2017 10 01 01 17 00 3454-99 S n2o CCGG 330.220 0.430 A.. H4 2018 01 03 11 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436474 SPO 2017 10 08 07 42 00 4025-99 P n2o CCGG 329.710 0.430 ... H4 2018 01 03 10 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436467 SPO 2017 10 08 07 42 00 4026-99 P n2o CCGG 328.370 0.430 ... H4 2018 01 03 10 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436468 SPO 2017 10 16 02 14 00 131-99 P n2o CCGG 328.600 0.430 ... H4 2018 01 05 15 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436461 SPO 2017 10 16 02 14 00 132-99 P n2o CCGG 329.110 0.430 ... H4 2018 01 05 16 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436462 SPO 2017 10 16 02 15 00 5601-99 S n2o CCGG 329.240 0.430 ... H4 2018 01 03 09 37 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436471 SPO 2017 10 16 02 15 00 5602-99 S n2o CCGG 329.480 0.430 ... H4 2018 01 03 09 53 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436472 SPO 2017 10 24 02 27 00 4937-99 P n2o CCGG 329.720 0.430 ... H4 2018 01 05 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436463 SPO 2017 10 24 02 27 00 4938-99 P n2o CCGG 329.300 0.430 ... H4 2018 01 05 15 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436464 SPO 2017 11 01 21 11 00 89-99 P n2o CCGG 330.020 0.430 ... H4 2018 01 03 09 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436469 SPO 2017 11 01 21 11 00 90-99 P n2o CCGG 329.980 0.430 ... H4 2018 01 03 09 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 436470 SPO 2017 11 01 21 17 00 2217-99 S n2o CCGG 328.970 0.430 ... H4 2018 01 05 14 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436465 SPO 2017 11 01 21 17 00 2218-99 S n2o CCGG 329.360 0.430 ... H4 2018 01 05 15 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 436466 SPO 2017 11 08 06 28 00 3055-99 P n2o CCGG 329.100 0.430 ... H4 2018 02 09 15 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437872 SPO 2017 11 08 06 28 00 348-99 P n2o CCGG 329.770 0.430 ... H4 2018 02 09 14 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437873 SPO 2017 11 18 00 12 00 3081-99 P n2o CCGG 328.620 0.430 ... H4 2018 02 09 14 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437868 SPO 2017 11 18 00 12 00 5046-99 P n2o CCGG 328.690 0.430 ... H4 2018 02 09 14 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437869 SPO 2017 11 18 00 17 00 3757-99 S n2o CCGG 329.750 0.430 ... H4 2018 02 08 12 32 00 -89.9800 -24.8000 2821.30 2810.00 11.30 437846 SPO 2017 11 18 00 17 00 3946-99 S n2o CCGG 329.380 0.430 ... H4 2018 02 08 12 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 437847 SPO 2017 11 24 02 02 00 4643-99 P n2o CCGG 329.410 0.430 ... H4 2018 02 08 13 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437848 SPO 2017 11 24 02 02 00 4875-99 P n2o CCGG 329.600 0.430 ... H4 2018 02 08 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437849 SPO 2017 12 01 02 16 00 3330-99 P n2o CCGG 329.320 0.430 ... H4 2018 02 08 12 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437850 SPO 2017 12 01 02 16 00 4895-99 P n2o CCGG 328.980 0.430 ... H4 2018 02 08 12 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437851 SPO 2017 12 01 02 18 00 240-99 S n2o CCGG 328.750 0.430 ... H4 2018 02 09 13 51 00 -89.9800 -24.8000 2821.30 2810.00 11.30 437866 SPO 2017 12 01 02 18 00 4852-99 S n2o CCGG 329.380 0.430 ... H4 2018 02 09 14 07 00 -89.9800 -24.8000 2821.30 2810.00 11.30 437867 SPO 2017 12 09 01 00 00 3075-99 P n2o CCGG 328.970 0.430 ... H4 2018 02 09 13 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437870 SPO 2017 12 09 01 00 00 4734-99 P n2o CCGG 328.720 0.430 ... H4 2018 02 09 13 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 437871 SPO 2017 12 15 01 10 00 5695-99 S n2o CCGG 330.120 0.430 ... H4 2018 02 27 14 18 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439204 SPO 2017 12 15 01 10 00 5696-99 S n2o CCGG 328.900 0.430 ... H4 2018 02 27 14 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439205 SPO 2017 12 15 01 13 00 5487-99 P n2o CCGG 329.910 0.430 ... H4 2018 02 27 16 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439192 SPO 2017 12 15 01 13 00 5488-99 P n2o CCGG 329.890 0.430 ... H4 2018 02 27 16 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439193 SPO 2017 12 26 03 01 00 5693-99 P n2o CCGG 328.840 0.430 ... H4 2018 02 27 15 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439194 SPO 2017 12 26 03 01 00 5694-99 P n2o CCGG 329.330 0.430 ... H4 2018 02 27 16 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439195 SPO 2018 01 01 20 12 00 5691-99 P n2o CCGG 329.520 0.430 ... H4 2018 02 27 15 21 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439190 SPO 2018 01 01 20 12 00 5692-99 P n2o CCGG 329.030 0.430 ... H4 2018 02 27 15 37 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439191 SPO 2018 01 01 20 18 00 5547-99 S n2o CCGG 328.690 0.430 ... H4 2018 02 27 13 46 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439202 SPO 2018 01 01 20 18 00 5548-99 S n2o CCGG 328.800 0.430 ... H4 2018 02 27 14 02 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439203 SPO 2018 01 09 03 22 00 853-99 P n2o CCGG 328.450 0.430 .X. H4 2018 02 27 13 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439198 SPO 2018 01 09 03 22 00 854-99 P n2o CCGG 328.540 0.430 .X. H4 2018 02 27 13 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439199 SPO 2018 01 15 02 20 00 2227-99 S n2o CCGG 329.100 0.430 ... H4 2018 02 27 14 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439196 SPO 2018 01 15 02 20 00 2228-99 S n2o CCGG 328.810 0.430 N.. H4 2018 02 27 15 05 00 -89.9800 -24.8000 2821.30 2810.00 11.30 439197 SPO 2018 01 15 02 31 00 5517-99 P n2o CCGG 329.410 0.430 ... H4 2018 02 27 12 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439200 SPO 2018 01 15 02 31 00 5518-99 P n2o CCGG 329.030 0.430 ... H4 2018 02 27 12 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 439201 SPO 2018 01 24 01 10 00 4642-99 P n2o CCGG 328.580 0.429 .X. H4 2018 12 04 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452155 SPO 2018 01 24 01 10 00 4796-99 P n2o CCGG 328.640 0.429 .X. H4 2018 12 04 12 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452156 SPO 2018 02 02 21 03 00 1065-99 P n2o CCGG 330.260 0.429 ... H4 2018 12 06 11 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452161 SPO 2018 02 02 21 03 00 593-99 P n2o CCGG 329.550 0.429 ... H4 2018 12 06 11 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452162 SPO 2018 02 02 21 09 00 102-99 S n2o CCGG 328.960 0.429 ... H4 2018 12 04 11 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452159 SPO 2018 02 02 21 09 00 1692-99 S n2o CCGG 328.790 0.429 ... H4 2018 12 04 11 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452160 SPO 2018 02 08 01 39 00 2253-99 P n2o CCGG 329.740 0.429 ... H4 2018 12 06 11 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452163 SPO 2018 02 08 01 39 00 531-99 P n2o CCGG 329.960 0.429 ... H4 2018 12 06 11 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452164 SPO 2018 02 15 00 57 00 1593-99 P n2o CCGG 329.990 0.429 ... H4 2018 12 06 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452165 SPO 2018 02 15 00 57 00 1635-99 P n2o CCGG 328.880 0.429 ... H4 2018 12 06 10 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452166 SPO 2018 02 15 01 03 00 1607-99 S n2o CCGG 328.580 0.429 ... H4 2018 12 04 11 04 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452157 SPO 2018 02 15 01 03 00 455-99 S n2o CCGG 329.630 0.429 ... H4 2018 12 04 10 48 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452158 SPO 2018 02 24 00 43 00 217-99 P n2o CCGG 329.760 0.429 ... H4 2018 12 04 10 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452153 SPO 2018 02 24 00 43 00 4241-99 P n2o CCGG 330.100 0.429 ... H4 2018 12 04 10 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452154 SPO 2018 03 01 00 44 00 1168-99 P n2o CCGG 329.290 0.429 ... H4 2018 12 07 12 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452175 SPO 2018 03 01 00 44 00 1697-99 P n2o CCGG 330.490 0.429 ... H4 2018 12 07 12 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452176 SPO 2018 03 01 00 48 00 326-99 S n2o CCGG 329.420 0.429 ... H4 2018 12 06 15 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452167 SPO 2018 03 01 00 48 00 5005-99 S n2o CCGG 329.500 0.429 ... H4 2018 12 06 16 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452168 SPO 2018 03 08 00 57 00 4015-99 P n2o CCGG 329.690 0.429 A.. H4 2018 12 13 16 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452321 SPO 2018 03 08 00 57 00 5416-99 P n2o CCGG 328.280 0.429 A.. H4 2018 12 13 16 26 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452322 SPO 2018 03 15 00 45 00 220-99 P n2o CCGG 328.940 0.429 ... H4 2018 12 13 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452319 SPO 2018 03 15 00 45 00 296-99 P n2o CCGG 329.250 0.429 ... H4 2018 12 13 15 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452320 SPO 2018 03 15 00 51 00 1997-99 S n2o CCGG 329.200 0.429 ... H4 2018 12 07 11 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452171 SPO 2018 03 15 00 51 00 4602-99 S n2o CCGG 329.430 0.429 ... H4 2018 12 07 11 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452172 SPO 2018 03 24 00 36 00 3639-99 P n2o CCGG 329.000 0.429 ... H4 2018 12 07 11 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452173 SPO 2018 03 24 00 36 00 4484-99 P n2o CCGG 328.410 0.429 ... H4 2018 12 07 11 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452174 SPO 2018 04 02 21 05 00 1317-99 P n2o CCGG 329.550 0.429 ... H4 2018 12 13 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452317 SPO 2018 04 02 21 05 00 904-99 P n2o CCGG 329.480 0.429 ... H4 2018 12 13 15 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452318 SPO 2018 04 02 21 10 00 237-99 S n2o CCGG 329.520 0.429 ... H4 2018 12 06 16 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452169 SPO 2018 04 02 21 10 00 2804-99 S n2o CCGG 329.490 0.429 ... H4 2018 12 06 17 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452170 SPO 2018 04 10 20 33 00 1419-99 P n2o CCGG 330.500 0.429 .X. H4 2018 12 13 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452323 SPO 2018 04 10 20 33 00 3554-99 P n2o CCGG 330.730 0.429 .X. H4 2018 12 13 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452324 SPO 2018 04 15 18 18 00 2965-99 P n2o CCGG 329.170 0.429 ... H4 2018 12 10 14 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452271 SPO 2018 04 15 18 18 00 744-99 P n2o CCGG 328.400 0.429 ... H4 2018 12 10 14 18 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452272 SPO 2018 04 15 18 26 00 5684-99 S n2o CCGG 329.550 0.429 ... H4 2018 12 10 12 11 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452266 SPO 2018 04 24 19 43 00 3338-99 P n2o CCGG 329.180 0.429 ... H4 2018 12 10 13 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452269 SPO 2018 04 24 19 43 00 5202-99 P n2o CCGG 329.120 0.429 ... H4 2018 12 10 14 02 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452270 SPO 2018 05 01 09 58 00 1654-99 P n2o CCGG 328.920 0.429 ... H4 2018 12 10 11 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452264 SPO 2018 05 01 09 58 00 2960-99 P n2o CCGG 328.970 0.429 ... H4 2018 12 10 11 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452265 SPO 2018 05 01 10 00 00 3613-99 S n2o CCGG 329.800 0.429 ... H4 2018 12 10 13 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452273 SPO 2018 05 01 10 00 00 4049-99 S n2o CCGG 329.120 0.429 ... H4 2018 12 10 13 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452274 SPO 2018 05 08 09 00 00 3893-99 P n2o CCGG 328.660 0.429 ... H4 2018 12 10 11 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452267 SPO 2018 05 08 09 00 00 948-99 P n2o CCGG 328.980 0.429 ... H4 2018 12 10 11 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452268 SPO 2018 05 15 09 24 00 180-99 S n2o CCGG 329.460 0.429 ... H4 2018 12 10 12 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452276 SPO 2018 05 15 09 24 00 2961-99 S n2o CCGG 329.420 0.429 N.. H4 2018 12 10 12 43 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452275 SPO 2018 05 15 09 25 00 1929-99 P n2o CCGG 329.210 0.429 ... H4 2018 12 10 10 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452262 SPO 2018 05 15 09 25 00 4128-99 P n2o CCGG 329.490 0.429 ... H4 2018 12 10 10 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452263 SPO 2018 05 24 19 45 00 4585-99 P n2o CCGG 329.620 0.429 ... H4 2018 12 13 14 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452301 SPO 2018 05 24 19 45 00 4586-99 P n2o CCGG 329.560 0.429 ... H4 2018 12 13 14 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452302 SPO 2018 06 01 18 16 00 3149-99 P n2o CCGG 330.020 0.429 ... H4 2018 12 14 10 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452325 SPO 2018 06 01 18 16 00 3150-99 P n2o CCGG 329.930 0.429 ... H4 2018 12 14 10 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452326 SPO 2018 06 01 18 19 00 5235-99 S n2o CCGG 329.170 0.429 ... H4 2018 12 14 09 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452331 SPO 2018 06 01 18 19 00 5236-99 S n2o CCGG 329.150 0.429 ... H4 2018 12 14 09 52 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452332 SPO 2018 06 08 08 09 00 827-99 P n2o CCGG 329.940 0.429 ... H4 2018 12 13 13 33 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452305 SPO 2018 06 08 08 09 00 828-99 P n2o CCGG 330.390 0.429 ... H4 2018 12 13 13 48 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452306 SPO 2018 06 15 18 59 00 4557-99 P n2o CCGG 329.240 0.429 ... H4 2018 12 13 16 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452327 SPO 2018 06 15 18 59 00 4558-99 P n2o CCGG 329.040 0.429 ... H4 2018 12 13 16 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452328 SPO 2018 06 15 19 09 00 2711-99 S n2o CCGG 329.320 0.429 ... H4 2018 12 13 13 01 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452307 SPO 2018 06 15 19 09 00 2712-99 S n2o CCGG 330.140 0.429 ... H4 2018 12 13 13 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452308 SPO 2018 06 24 15 41 00 421-99 P n2o CCGG 329.580 0.429 ... H4 2018 12 13 12 29 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452303 SPO 2018 06 24 15 41 00 422-99 P n2o CCGG 329.510 0.429 ... H4 2018 12 13 12 45 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452304 SPO 2018 07 01 18 18 00 107-99 P n2o CCGG 330.460 0.429 ... H4 2018 12 07 14 35 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452258 SPO 2018 07 01 18 18 00 4399-99 P n2o CCGG 329.980 0.429 ... H4 2018 12 07 14 50 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452259 SPO 2018 07 01 18 32 00 4987-99 S n2o CCGG 329.300 0.429 .X. H4 2018 12 11 12 19 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452329 SPO 2018 07 01 18 32 00 4988-99 S n2o CCGG 328.350 0.429 .X. H4 2018 12 11 12 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452330 SPO 2018 07 08 20 08 00 2523-99 P n2o CCGG 330.320 0.429 ... H4 2018 12 12 12 38 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452285 SPO 2018 07 08 20 08 00 3595-99 P n2o CCGG 329.890 0.429 ... H4 2018 12 12 12 53 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452286 SPO 2018 07 16 02 02 00 459-99 S n2o CCGG 329.140 0.429 ... H4 2018 12 07 13 00 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452260 SPO 2018 07 16 02 02 00 858-99 S n2o CCGG 329.920 0.429 ... H4 2018 12 07 13 16 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452261 SPO 2018 07 16 02 14 00 2138-99 P n2o CCGG 329.160 0.429 ... H4 2018 12 12 12 06 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452287 SPO 2018 07 16 02 14 00 3913-99 P n2o CCGG 329.910 0.429 ... H4 2018 12 12 12 22 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452288 SPO 2018 07 24 19 21 00 137-99 P n2o CCGG 330.430 0.429 ... H4 2018 12 07 14 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452256 SPO 2018 07 24 19 21 00 3093-99 P n2o CCGG 330.160 0.429 ... H4 2018 12 07 14 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452257 SPO 2018 08 01 18 37 00 4257-99 P n2o CCGG 330.240 0.429 ... H4 2018 12 07 13 31 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452254 SPO 2018 08 01 18 37 00 5247-99 P n2o CCGG 330.370 0.429 ... H4 2018 12 07 13 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452255 SPO 2018 08 01 19 15 00 3271-99 S n2o CCGG 330.590 0.429 ... H4 2018 12 12 11 34 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452291 SPO 2018 08 01 19 15 00 4628-99 S n2o CCGG 329.890 0.429 ... H4 2018 12 12 11 50 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452292 SPO 2018 08 08 19 07 00 1472-99 P n2o CCGG 329.840 0.429 ... H4 2018 12 12 11 19 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452290 SPO 2018 08 08 19 07 00 2615-99 P n2o CCGG 330.300 0.429 ... H4 2018 12 12 11 03 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452289 SPO 2018 08 15 18 17 00 1282-99 P n2o CCGG 330.010 0.429 ... H4 2018 12 11 11 32 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452277 SPO 2018 08 15 18 17 00 1753-99 P n2o CCGG 330.760 0.429 ... H4 2018 12 11 11 47 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452278 SPO 2018 08 15 18 20 00 4682-99 S n2o CCGG 330.110 0.429 ... H4 2018 12 14 14 20 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452315 SPO 2018 08 15 18 20 00 5154-99 S n2o CCGG 330.390 0.429 ... H4 2018 12 14 14 36 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452316 SPO 2018 08 24 08 37 00 3043-99 P n2o CCGG 330.060 0.429 ... H4 2018 12 14 13 49 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452311 SPO 2018 08 24 08 37 00 5373-99 P n2o CCGG 329.760 0.429 ... H4 2018 12 14 14 05 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452312 SPO 2018 09 01 18 22 00 3836-99 P n2o CCGG 329.310 0.429 ... H4 2018 12 11 11 00 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452279 SPO 2018 09 01 18 22 00 4909-99 P n2o CCGG 329.940 0.429 ... H4 2018 12 11 11 16 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452280 SPO 2018 09 01 18 29 00 4092-99 S n2o CCGG 330.630 0.429 ... H4 2018 12 14 13 17 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452313 SPO 2018 09 01 18 29 00 4595-99 S n2o CCGG 330.430 0.429 ... H4 2018 12 14 13 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452314 SPO 2018 09 08 07 06 00 2232-99 P n2o CCGG 329.980 0.429 ... H4 2018 12 11 10 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452281 SPO 2018 09 08 07 06 00 5424-99 P n2o CCGG 330.570 0.429 ... H4 2018 12 11 10 44 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452282 SPO 2018 09 15 19 25 00 1715-99 P n2o CCGG 330.370 0.429 ... H4 2018 12 14 12 46 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452309 SPO 2018 09 15 19 25 00 2108-99 S n2o CCGG 330.740 0.429 ... H4 2018 12 11 09 57 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452283 SPO 2018 09 15 19 25 00 3681-99 P n2o CCGG 330.660 0.429 ... H4 2018 12 14 13 01 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452310 SPO 2018 09 15 19 25 00 4704-99 S n2o CCGG 331.690 0.429 N.. H4 2018 12 11 10 13 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452284 SPO 2018 09 24 09 13 00 1700-99 P n2o CCGG 330.040 0.429 ... H4 2018 12 14 12 14 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452295 SPO 2018 09 24 09 13 00 5224-99 P n2o CCGG 330.350 0.429 ... H4 2018 12 14 12 30 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452296 SPO 2018 10 01 07 12 00 214-99 P n2o CCGG 330.470 0.429 ... H4 2018 12 14 11 42 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452299 SPO 2018 10 01 07 12 00 2420-99 S n2o CCGG 331.120 0.429 ... H4 2018 12 12 16 03 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452250 SPO 2018 10 01 07 12 00 3553-99 P n2o CCGG 330.110 0.429 ... H4 2018 12 14 11 58 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452300 SPO 2018 10 01 07 12 00 3709-99 S n2o CCGG 330.850 0.429 N.. H4 2018 12 12 15 47 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452251 SPO 2018 10 08 01 45 00 4414-99 P n2o CCGG 331.290 0.429 ... H4 2018 12 12 14 12 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452246 SPO 2018 10 08 01 45 00 4611-99 P n2o CCGG 330.720 0.429 ... H4 2018 12 12 14 28 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452247 SPO 2018 10 15 23 21 00 117-99 S n2o CCGG 330.960 0.429 ... H4 2018 12 12 13 41 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452252 SPO 2018 10 15 23 21 00 3212-99 S n2o CCGG 331.720 0.429 ... H4 2018 12 12 13 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 452253 SPO 2018 10 15 23 21 00 4547-99 P n2o CCGG 330.120 0.429 ... H4 2018 12 14 11 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452297 SPO 2018 10 15 23 21 00 5206-99 P n2o CCGG 330.280 0.429 ... H4 2018 12 14 11 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452298 SPO 2018 10 24 23 55 00 5066-99 P n2o CCGG 331.110 0.429 A.. H4 2018 12 14 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452294 SPO 2018 10 24 23 55 00 5189-99 P n2o CCGG 329.650 0.429 A.. H4 2018 12 14 10 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452293 SPO 2018 11 02 03 20 00 3266-99 S n2o CCGG 331.250 0.429 ... H4 2019 03 06 16 42 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455145 SPO 2018 11 02 03 20 00 3874-99 P n2o CCGG 330.220 0.429 ... H4 2018 12 12 13 09 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452248 SPO 2018 11 02 03 20 00 4700-99 S n2o CCGG 330.820 0.429 ... H4 2019 03 06 16 58 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455146 SPO 2018 11 02 03 20 00 5595-99 P n2o CCGG 330.350 0.429 ... H4 2018 12 12 13 25 00 -89.9800 -24.8000 2815.00 2810.00 5.00 452249 SPO 2018 11 08 00 39 00 1410-99 P n2o CCGG 330.220 0.429 ... H4 2019 03 06 15 08 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455205 SPO 2018 11 08 00 39 00 2545-99 P n2o CCGG 328.930 0.429 A.. H4 2019 03 06 15 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455206 SPO 2018 11 17 00 58 00 2764-99 P n2o CCGG 330.440 0.429 ... H4 2019 03 06 14 36 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455207 SPO 2018 11 17 00 58 00 4449-99 P n2o CCGG 330.690 0.429 ... H4 2019 03 06 14 52 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455208 SPO 2018 11 17 01 03 00 2719-99 S n2o CCGG 331.050 0.429 ... H4 2019 03 06 17 14 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455143 SPO 2018 11 17 01 03 00 4844-99 S n2o CCGG 330.430 0.429 ... H4 2019 03 06 17 30 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455144 SPO 2018 11 24 00 15 00 4267-99 P n2o CCGG 330.300 0.429 ... H4 2019 03 06 14 20 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455204 SPO 2018 11 24 00 15 00 545-99 P n2o CCGG 330.820 0.429 ... H4 2019 03 06 14 04 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455203 SPO 2018 12 01 00 56 00 4551-99 P n2o CCGG 330.060 0.429 ... H4 2019 03 06 16 11 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455141 SPO 2018 12 01 00 56 00 4754-99 P n2o CCGG 330.730 0.429 ... H4 2019 03 06 16 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455142 SPO 2018 12 01 01 02 00 3189-99 S n2o CCGG 330.530 0.429 ... H4 2019 03 06 13 33 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455209 SPO 2018 12 01 01 02 00 5148-99 S n2o CCGG 331.220 0.429 ... H4 2019 03 06 13 49 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455210 SPO 2018 12 08 00 13 00 1409-99 P n2o CCGG 331.060 0.429 ... H4 2019 03 06 15 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455139 SPO 2018 12 08 00 13 00 5374-99 P n2o CCGG 330.680 0.429 ... H4 2019 03 06 15 55 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455140 SPO 2018 12 15 00 16 00 1182-99 P n2o CCGG 330.550 0.429 ... H4 2019 03 06 11 10 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455183 SPO 2018 12 15 00 16 00 70-99 P n2o CCGG 330.920 0.429 ... H4 2019 03 06 10 54 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455184 SPO 2018 12 15 00 21 00 2915-99 S n2o CCGG 330.020 0.429 ... H4 2019 03 07 14 59 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455159 SPO 2018 12 15 00 21 00 4132-99 S n2o CCGG 330.750 0.429 ... H4 2019 03 07 15 15 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455160 SPO 2018 12 24 00 07 00 1133-99 P n2o CCGG 330.530 0.429 ... H4 2019 03 07 14 27 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455155 SPO 2018 12 24 00 07 00 3005-99 P n2o CCGG 330.620 0.429 ... H4 2019 03 07 14 43 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455156 SPO 2019 01 01 19 50 00 4237-99 P n2o CCGG 330.690 0.429 ... H4 2019 03 06 10 23 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455182 SPO 2019 01 01 19 50 00 5572-99 P n2o CCGG 331.120 0.429 ... H4 2019 03 06 10 39 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455181 SPO 2019 01 01 19 56 00 1439-99 S n2o CCGG 329.750 0.429 A.. H4 2019 03 07 14 12 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455161 SPO 2019 01 01 19 56 00 425-99 S n2o CCGG 331.210 0.429 A.. H4 2019 03 07 13 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455162 SPO 2019 01 08 00 26 00 5499-99 P n2o CCGG 330.690 0.429 ... H4 2019 03 06 10 07 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455180 SPO 2019 01 08 00 26 00 552-99 P n2o CCGG 330.690 0.429 ... H4 2019 03 06 09 51 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455179 SPO 2019 01 15 00 51 00 462-99 P n2o CCGG 331.090 0.429 ... H4 2019 03 07 13 24 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455157 SPO 2019 01 15 00 51 00 4703-99 P n2o CCGG 330.720 0.429 ... H4 2019 03 07 13 40 00 -89.9800 -24.8000 2815.00 2810.00 5.00 455158 SPO 2019 01 15 00 58 00 3451-99 S n2o CCGG 331.200 0.429 ... H4 2019 03 05 16 40 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455185 SPO 2019 01 15 00 58 00 4373-99 S n2o CCGG 331.050 0.429 ... H4 2019 03 05 16 56 00 -89.9800 -24.8000 2821.30 2810.00 11.30 455186 SPO 2019 01 26 00 14 00 1413-99 P n2o CCGG 330.950 0.157 ... AR2 2020 01 09 10 19 12 -89.9800 -24.8000 2815.00 2810.00 5.00 469236 SPO 2019 01 26 00 14 00 4147-99 P n2o CCGG 330.890 0.157 ... AR2 2020 01 09 10 33 28 -89.9800 -24.8000 2815.00 2810.00 5.00 469237 SPO 2019 02 01 00 35 00 4058-99 P n2o CCGG 330.820 0.157 ... AR2 2020 01 09 09 22 03 -89.9800 -24.8000 2815.00 2810.00 5.00 469234 SPO 2019 02 01 00 35 00 4958-99 P n2o CCGG 330.760 0.157 ... AR2 2020 01 09 09 36 19 -89.9800 -24.8000 2815.00 2810.00 5.00 469235 SPO 2019 02 01 00 39 00 1788-99 S n2o CCGG 330.790 0.157 ... AR2 2020 01 09 09 50 39 -89.9800 -24.8000 2821.30 2810.00 11.30 469232 SPO 2019 02 01 00 39 00 3715-99 S n2o CCGG 330.820 0.157 ... AR2 2020 01 09 10 04 55 -89.9800 -24.8000 2821.30 2810.00 11.30 469233 SPO 2019 02 08 00 11 00 1340-99 P n2o CCGG 330.740 0.157 ... AR2 2020 01 09 16 02 18 -89.9800 -24.8000 2815.00 2810.00 5.00 469310 SPO 2019 02 08 00 11 00 5410-99 P n2o CCGG 330.680 0.157 ... AR2 2020 01 09 16 16 36 -89.9800 -24.8000 2815.00 2810.00 5.00 469311 SPO 2019 02 15 01 27 00 2104-99 P n2o CCGG 330.720 0.157 ... AR2 2020 01 09 15 05 02 -89.9800 -24.8000 2815.00 2810.00 5.00 469306 SPO 2019 02 15 01 27 00 2767-99 P n2o CCGG 330.610 0.157 ... AR2 2020 01 09 15 19 20 -89.9800 -24.8000 2815.00 2810.00 5.00 469307 SPO 2019 02 15 01 31 00 1998-99 S n2o CCGG 330.660 0.157 ... AR2 2020 01 09 15 33 38 -89.9800 -24.8000 2821.30 2810.00 11.30 469308 SPO 2019 02 15 01 31 00 5308-99 S n2o CCGG 330.690 0.157 ... AR2 2020 01 09 15 47 56 -89.9800 -24.8000 2821.30 2810.00 11.30 469309 SPO 2019 02 24 00 06 00 1672-99 P n2o CCGG 330.580 0.157 ... AR2 2020 01 09 14 36 27 -89.9800 -24.8000 2815.00 2810.00 5.00 469304 SPO 2019 02 24 00 06 00 4074-99 P n2o CCGG 330.610 0.157 ... AR2 2020 01 09 14 50 45 -89.9800 -24.8000 2815.00 2810.00 5.00 469305 SPO 2019 03 01 00 20 00 2562-99 P n2o CCGG 330.680 0.157 ... AR2 2020 01 09 12 13 38 -89.9800 -24.8000 2815.00 2810.00 5.00 469386 SPO 2019 03 01 00 20 00 4415-99 P n2o CCGG 330.550 0.157 ... AR2 2020 01 09 12 27 57 -89.9800 -24.8000 2815.00 2810.00 5.00 469387 SPO 2019 03 01 00 24 00 2853-99 S n2o CCGG 330.640 0.157 ... AR2 2020 01 13 14 37 15 -89.9800 -24.8000 2821.30 2810.00 11.30 469322 SPO 2019 03 01 00 24 00 2854-99 S n2o CCGG 330.610 0.157 ... AR2 2020 01 13 14 51 30 -89.9800 -24.8000 2821.30 2810.00 11.30 469323 SPO 2019 03 08 00 31 00 2885-99 P n2o CCGG 330.680 0.157 ... AR2 2020 01 13 15 05 45 -89.9800 -24.8000 2815.00 2810.00 5.00 469320 SPO 2019 03 08 00 31 00 2886-99 P n2o CCGG 330.610 0.157 ... AR2 2020 01 13 15 20 01 -89.9800 -24.8000 2815.00 2810.00 5.00 469321 SPO 2019 03 15 00 34 00 5675-99 P n2o CCGG 330.410 0.157 ... AR2 2020 01 13 13 40 10 -89.9800 -24.8000 2815.00 2810.00 5.00 469342 SPO 2019 03 15 00 34 00 5676-99 P n2o CCGG 330.550 0.157 ... AR2 2020 01 13 13 54 26 -89.9800 -24.8000 2815.00 2810.00 5.00 469343 SPO 2019 03 15 00 38 00 3911-99 S n2o CCGG 330.720 0.157 ... AR2 2020 01 13 13 11 40 -89.9800 -24.8000 2821.30 2810.00 11.30 469340 SPO 2019 03 15 00 38 00 3912-99 S n2o CCGG 330.730 0.157 ... AR2 2020 01 13 13 25 55 -89.9800 -24.8000 2821.30 2810.00 11.30 469341 SPO 2019 03 24 00 21 00 3405-99 P n2o CCGG 330.740 0.157 ... AR2 2020 01 13 12 43 02 -89.9800 -24.8000 2815.00 2810.00 5.00 469338 SPO 2019 03 24 00 21 00 3406-99 P n2o CCGG 330.650 0.157 ... AR2 2020 01 13 12 57 22 -89.9800 -24.8000 2815.00 2810.00 5.00 469339 SPO 2019 04 01 00 37 00 33-99 P n2o CCGG 330.710 0.157 ... AR2 2020 01 10 14 19 54 -89.9800 -24.8000 2815.00 2810.00 5.00 469278 SPO 2019 04 01 00 37 00 34-99 P n2o CCGG 330.700 0.157 ... AR2 2020 01 10 14 34 10 -89.9800 -24.8000 2815.00 2810.00 5.00 469279 SPO 2019 04 01 00 42 00 1675-99 S n2o CCGG 330.690 0.157 ... AR2 2020 01 13 12 14 24 -89.9800 -24.8000 2821.30 2810.00 11.30 469336 SPO 2019 04 01 00 42 00 1676-99 S n2o CCGG 330.780 0.157 ... AR2 2020 01 13 12 28 41 -89.9800 -24.8000 2821.30 2810.00 11.30 469337 SPO 2019 04 08 01 48 00 2241-99 P n2o CCGG 330.530 0.157 ... AR2 2020 01 10 13 51 21 -89.9800 -24.8000 2815.00 2810.00 5.00 469276 SPO 2019 04 08 01 48 00 2242-99 P n2o CCGG 330.550 0.157 ... AR2 2020 01 10 14 05 37 -89.9800 -24.8000 2815.00 2810.00 5.00 469277 SPO 2019 04 15 02 16 00 1011-99 P n2o CCGG 330.620 0.157 ... AR2 2020 01 09 11 16 24 -89.9800 -24.8000 2815.00 2810.00 5.00 469248 SPO 2019 04 15 02 16 00 4053-99 P n2o CCGG 330.500 0.157 ... AR2 2020 01 09 11 30 42 -89.9800 -24.8000 2815.00 2810.00 5.00 469249 SPO 2019 04 15 02 21 00 4450-99 S n2o CCGG 330.590 0.157 ... AR2 2020 01 09 11 45 00 -89.9800 -24.8000 2821.30 2810.00 11.30 469250 SPO 2019 04 15 02 21 00 5489-99 S n2o CCGG 330.390 0.157 ... AR2 2020 01 09 11 59 19 -89.9800 -24.8000 2821.30 2810.00 11.30 469251 SPO 2019 04 24 02 09 00 1233-99 P n2o CCGG 330.330 0.157 ... AR2 2020 01 14 13 47 07 -89.9800 -24.8000 2815.00 2810.00 5.00 469384 SPO 2019 04 24 02 09 00 5685-99 P n2o CCGG 330.190 0.157 ... AR2 2020 01 14 14 01 23 -89.9800 -24.8000 2815.00 2810.00 5.00 469385 SPO 2019 05 01 02 07 00 3915-99 P n2o CCGG 330.450 0.157 ... AR2 2020 01 14 13 04 18 -89.9800 -24.8000 2821.30 2810.00 11.30 469381 SPO 2019 05 01 02 07 00 542-99 P n2o CCGG 330.390 0.157 ... AR2 2020 01 14 12 50 03 -89.9800 -24.8000 2821.30 2810.00 11.30 469380 SPO 2019 05 01 02 12 00 2752-99 S n2o CCGG 330.460 0.157 ... AR2 2020 01 14 13 18 33 -89.9800 -24.8000 2821.30 2810.00 11.30 469382 SPO 2019 05 01 02 12 00 4614-99 S n2o CCGG 330.500 0.157 ... AR2 2020 01 14 13 32 52 -89.9800 -24.8000 2821.30 2810.00 11.30 469383 SPO 2019 05 08 02 03 00 1165-99 P n2o CCGG 330.430 0.157 ... AR2 2020 01 14 12 21 33 -89.9800 -24.8000 2815.00 2810.00 5.00 469378 SPO 2019 05 08 02 03 00 1434-99 P n2o CCGG 330.390 0.157 ... AR2 2020 01 14 12 35 48 -89.9800 -24.8000 2815.00 2810.00 5.00 469379 SPO 2019 05 15 01 56 00 2012-99 P n2o CCGG 330.390 0.157 ... AR2 2020 01 14 11 24 21 -89.9800 -24.8000 2815.00 2810.00 5.00 469316 SPO 2019 05 15 01 56 00 3042-99 P n2o CCGG 330.370 0.157 ... AR2 2020 01 14 11 38 37 -89.9800 -24.8000 2815.00 2810.00 5.00 469317 SPO 2019 05 15 02 00 00 150-99 S n2o CCGG 330.450 0.157 ... AR2 2020 01 14 11 52 57 -89.9800 -24.8000 2821.30 2810.00 11.30 469318 SPO 2019 05 15 02 00 00 3269-99 S n2o CCGG 330.410 0.157 ... AR2 2020 01 14 12 07 15 -89.9800 -24.8000 2821.30 2810.00 11.30 469319 SPO 2019 05 24 01 47 00 1139-99 P n2o CCGG 330.310 0.157 ... AR2 2020 01 10 13 22 45 -89.9800 -24.8000 2815.00 2810.00 5.00 469275 SPO 2019 05 24 01 47 00 775-99 P n2o CCGG 330.240 0.157 ... AR2 2020 01 10 13 37 01 -89.9800 -24.8000 2815.00 2810.00 5.00 469274 SPO 2019 06 03 01 34 00 5109-99 P n2o CCGG 330.490 0.157 ... AR2 2020 01 10 12 54 10 -89.9800 -24.8000 2815.00 2810.00 5.00 469273 SPO 2019 06 03 01 38 00 2413-99 S n2o CCGG 330.470 0.157 ... AR2 2020 01 09 14 07 54 -89.9800 -24.8000 2821.30 2810.00 11.30 469294 SPO 2019 06 03 01 38 00 3178-99 S n2o CCGG 330.590 0.157 ... AR2 2020 01 09 14 22 11 -89.9800 -24.8000 2821.30 2810.00 11.30 469295 SPO 2019 06 08 00 12 00 1581-99 P n2o CCGG 330.500 0.157 ... AR2 2020 01 09 13 39 21 -89.9800 -24.8000 2815.00 2810.00 5.00 469292 SPO 2019 06 08 00 12 00 4633-99 P n2o CCGG 330.480 0.157 ... AR2 2020 01 09 13 53 38 -89.9800 -24.8000 2815.00 2810.00 5.00 469293 SPO 2019 06 17 00 30 00 1531-99 P n2o CCGG 330.610 0.157 ... AR2 2020 01 09 12 56 32 -89.9800 -24.8000 2815.00 2810.00 5.00 469289 SPO 2019 06 17 00 30 00 591-99 P n2o CCGG 330.580 0.157 ... AR2 2020 01 09 12 42 15 -89.9800 -24.8000 2815.00 2810.00 5.00 469288 SPO 2019 06 17 00 34 00 5586-99 S n2o CCGG 330.530 0.157 ... AR2 2020 01 09 13 25 05 -89.9800 -24.8000 2821.30 2810.00 11.30 469291 SPO 2019 06 17 00 34 00 824-99 S n2o CCGG 330.590 0.157 ... AR2 2020 01 09 13 10 48 -89.9800 -24.8000 2821.30 2810.00 11.30 469290 SPO 2019 06 24 01 56 00 1728-99 P n2o CCGG 330.610 0.157 ... AR2 2020 01 10 18 23 06 -89.9800 -24.8000 2815.00 2810.00 5.00 469287 SPO 2019 06 24 01 56 00 588-99 P n2o CCGG 330.630 0.157 ... AR2 2020 01 10 18 08 49 -89.9800 -24.8000 2815.00 2810.00 5.00 469286 SPO 2019 07 01 01 25 00 3504-99 P n2o CCGG 330.730 0.157 ... AR2 2020 01 10 17 11 38 -89.9800 -24.8000 2815.00 2810.00 5.00 469282 SPO 2019 07 01 01 25 00 3625-99 P n2o CCGG 330.650 0.157 ... AR2 2020 01 10 17 25 54 -89.9800 -24.8000 2815.00 2810.00 5.00 469283 SPO 2019 07 01 01 29 00 2574-99 S n2o CCGG 330.700 0.157 ... AR2 2020 01 10 17 40 10 -89.9800 -24.8000 2821.30 2810.00 11.30 469284 SPO 2019 07 01 01 29 00 5001-99 S n2o CCGG 330.770 0.157 ... AR2 2020 01 10 17 54 27 -89.9800 -24.8000 2821.30 2810.00 11.30 469285 SPO 2019 07 08 00 06 00 2472-99 P n2o CCGG 330.780 0.157 ... AR2 2020 01 10 14 48 31 -89.9800 -24.8000 2815.00 2810.00 5.00 469280 SPO 2019 07 08 00 06 00 5120-99 P n2o CCGG 330.560 0.157 ... AR2 2020 01 10 15 02 53 -89.9800 -24.8000 2815.00 2810.00 5.00 469281 SPO 2019 07 15 00 34 00 2020-99 P n2o CCGG 330.860 0.157 ... AR2 2020 01 14 09 58 39 -89.9800 -24.8000 2815.00 2810.00 5.00 469302 SPO 2019 07 15 00 34 00 4525-99 P n2o CCGG 330.790 0.157 ... AR2 2020 01 14 10 12 54 -89.9800 -24.8000 2815.00 2810.00 5.00 469303 SPO 2019 07 15 00 39 00 3103-99 S n2o CCGG 330.830 0.157 ... AR2 2020 01 14 09 44 23 -89.9800 -24.8000 2821.30 2810.00 11.30 469301 SPO 2019 07 15 00 39 00 689-99 S n2o CCGG 330.790 0.157 ... AR2 2020 01 14 09 30 06 -89.9800 -24.8000 2821.30 2810.00 11.30 469300 SPO 2019 07 24 21 14 00 3445-99 P n2o CCGG 330.930 0.157 ... AR2 2020 01 13 16 31 35 -89.9800 -24.8000 2815.00 2810.00 5.00 469298 SPO 2019 07 24 21 14 00 4715-99 P n2o CCGG 330.910 0.157 ... AR2 2020 01 13 16 45 52 -89.9800 -24.8000 2815.00 2810.00 5.00 469299 SPO 2019 08 01 00 21 00 1325-99 P n2o CCGG 330.980 0.157 ... AR2 2020 01 10 13 08 27 -89.9800 -24.8000 2815.00 2810.00 5.00 469272 SPO 2019 08 01 00 26 00 4248-99 S n2o CCGG 330.960 0.157 ... AR2 2020 01 13 16 02 54 -89.9800 -24.8000 2821.30 2810.00 11.30 469296 SPO 2019 08 01 00 26 00 5616-99 S n2o CCGG 330.960 0.157 ... AR2 2020 01 13 16 17 14 -89.9800 -24.8000 2821.30 2810.00 11.30 469297 SPO 2019 08 08 00 15 00 1086-99 P n2o CCGG 331.020 0.157 ... AR2 2020 01 09 10 47 45 -89.9800 -24.8000 2815.00 2810.00 5.00 469238 SPO 2019 08 08 00 15 00 2173-99 P n2o CCGG 331.020 0.157 ... AR2 2020 01 09 11 02 06 -89.9800 -24.8000 2815.00 2810.00 5.00 469239 SPO 2019 08 15 00 24 00 3204-99 P n2o CCGG 331.020 0.157 ... AR2 2020 01 14 10 27 09 -89.9800 -24.8000 2815.00 2810.00 5.00 469312 SPO 2019 08 15 00 24 00 4936-99 P n2o CCGG 331.000 0.157 ... AR2 2020 01 14 10 41 26 -89.9800 -24.8000 2815.00 2810.00 5.00 469313 SPO 2019 08 15 00 29 00 2203-99 S n2o CCGG 331.070 0.157 ... AR2 2020 01 14 10 55 42 -89.9800 -24.8000 2821.30 2810.00 11.30 469314 SPO 2019 08 15 00 29 00 3427-99 S n2o CCGG 331.060 0.157 ... AR2 2020 01 14 11 10 03 -89.9800 -24.8000 2821.30 2810.00 11.30 469315 SPO 2019 08 24 00 09 00 2495-99 P n2o CCGG 331.140 0.157 ... AR2 2020 01 13 11 45 51 -89.9800 -24.8000 2815.00 2810.00 5.00 469334 SPO 2019 08 24 00 09 00 2832-99 P n2o CCGG 331.030 0.157 ... AR2 2020 01 13 12 00 07 -89.9800 -24.8000 2815.00 2810.00 5.00 469335 SPO 2019 09 01 00 12 00 1353-99 P n2o CCGG 331.200 0.157 ... AR2 2020 01 10 19 20 12 -89.9800 -24.8000 2815.00 2810.00 5.00 469331 SPO 2019 09 01 00 12 00 268-99 P n2o CCGG 331.190 0.157 ... AR2 2020 01 10 19 05 55 -89.9800 -24.8000 2815.00 2810.00 5.00 469330 SPO 2019 09 01 00 16 00 3049-99 S n2o CCGG 331.240 0.157 ... AR2 2020 01 13 11 17 12 -89.9800 -24.8000 2821.30 2810.00 11.30 469332 SPO 2019 09 01 00 16 00 4592-99 S n2o CCGG 331.220 0.157 ... AR2 2020 01 13 11 31 30 -89.9800 -24.8000 2821.30 2810.00 11.30 469333 SPO 2019 09 08 00 15 00 2256-99 P n2o CCGG 331.240 0.157 ... AR2 2020 01 10 18 37 22 -89.9800 -24.8000 2815.00 2810.00 5.00 469328 SPO 2019 09 08 00 15 00 3233-99 P n2o CCGG 331.250 0.157 ... AR2 2020 01 10 18 51 38 -89.9800 -24.8000 2815.00 2810.00 5.00 469329 SPO 2019 09 16 23 07 00 1972-99 P n2o CCGG 331.260 0.157 ... AR2 2020 01 13 14 08 41 -89.9800 -24.8000 2815.00 2810.00 5.00 469324 SPO 2019 09 16 23 07 00 2676-99 P n2o CCGG 331.240 0.157 ... AR2 2020 01 13 14 22 56 -89.9800 -24.8000 2815.00 2810.00 5.00 469325 SPO 2019 09 16 23 11 00 184-99 S n2o CCGG 331.270 0.157 ... AR2 2020 01 13 15 34 19 -89.9800 -24.8000 2821.30 2810.00 11.30 469326 SPO 2019 09 16 23 11 00 3868-99 S n2o CCGG 331.310 0.157 ... AR2 2020 01 13 15 48 36 -89.9800 -24.8000 2821.30 2810.00 11.30 469327 SPO 2019 09 24 00 07 00 1408-99 P n2o CCGG 331.290 0.157 ... AR2 2020 01 10 10 02 44 -89.9800 -24.8000 2815.00 2810.00 5.00 469148 SPO 2019 09 24 00 07 00 5067-99 P n2o CCGG 331.290 0.157 ... AR2 2020 01 10 10 17 00 -89.9800 -24.8000 2815.00 2810.00 5.00 469149 SPO 2019 10 01 22 33 00 2359-99 P n2o CCGG 331.330 0.157 ... AR2 2020 01 10 12 25 34 -89.9800 -24.8000 2815.00 2810.00 5.00 469246 SPO 2019 10 01 22 33 00 4851-99 P n2o CCGG 331.300 0.157 ... AR2 2020 01 10 12 39 52 -89.9800 -24.8000 2815.00 2810.00 5.00 469247 SPO 2019 10 01 22 37 00 1421-99 S n2o CCGG 331.390 0.157 ... AR2 2020 01 09 16 30 53 -89.9800 -24.8000 2821.30 2810.00 11.30 469228 SPO 2019 10 01 22 37 00 1958-99 S n2o CCGG 331.370 0.157 ... AR2 2020 01 09 16 45 10 -89.9800 -24.8000 2821.30 2810.00 11.30 469229 SPO 2019 10 08 00 06 00 2907-99 P n2o CCGG 331.390 0.157 ... AR2 2020 01 10 10 31 16 -89.9800 -24.8000 2821.30 2810.00 11.30 469230 SPO 2019 10 08 00 06 00 3823-99 P n2o CCGG 331.410 0.157 ... AR2 2020 01 10 10 45 33 -89.9800 -24.8000 2821.30 2810.00 11.30 469231 SPO 2019 10 16 21 47 00 1191-99 P n2o CCGG 331.550 0.157 ... AR2 2020 01 10 11 56 59 -89.9800 -24.8000 2815.00 2810.00 5.00 469244 SPO 2019 10 16 21 47 00 2054-99 P n2o CCGG 331.530 0.157 ... AR2 2020 01 10 12 11 17 -89.9800 -24.8000 2815.00 2810.00 5.00 469245 SPO 2019 10 16 21 51 00 1088-99 S n2o CCGG 331.560 0.157 ... AR2 2020 01 10 11 28 22 -89.9800 -24.8000 2821.30 2810.00 11.30 469240 SPO 2019 10 16 21 51 00 2158-99 S n2o CCGG 331.570 0.157 ... AR2 2020 01 10 11 42 40 -89.9800 -24.8000 2821.30 2810.00 11.30 469241 SPO 2019 10 24 00 07 00 4806-99 P n2o CCGG 331.460 0.157 ... AR2 2020 01 10 11 14 05 -89.9800 -24.8000 2815.00 2810.00 5.00 469243 SPO 2019 11 01 00 32 00 2316-99 P n2o CCGG 331.510 0.157 ... AR2 2020 01 10 10 59 49 -89.9800 -24.8000 2815.00 2810.00 5.00 469242 SPO 2019 11 01 00 36 00 3050-99 S n2o CCGG 331.430 0.157 ... AR2 2020 01 22 11 50 51 -89.9800 -24.8000 2821.30 2810.00 11.30 469779 SPO 2019 11 01 00 36 00 5633-99 S n2o CCGG 331.410 0.157 ... AR2 2020 01 22 12 05 11 -89.9800 -24.8000 2821.30 2810.00 11.30 469780 SPO 2019 11 09 00 39 00 2674-99 P n2o CCGG 331.380 0.157 ... AR2 2020 01 22 11 22 12 -89.9800 -24.8000 2815.00 2810.00 5.00 469777 SPO 2019 11 09 00 39 00 5096-99 P n2o CCGG 331.320 0.157 ... AR2 2020 01 22 11 36 31 -89.9800 -24.8000 2815.00 2810.00 5.00 469778 SPO 2019 11 15 00 55 00 1561-99 P n2o CCGG 331.440 0.157 ... AR2 2020 01 22 14 14 03 -89.9800 -24.8000 2815.00 2810.00 5.00 469843 SPO 2019 11 15 00 55 00 3851-99 P n2o CCGG 331.440 0.157 ... AR2 2020 01 22 14 28 21 -89.9800 -24.8000 2815.00 2810.00 5.00 469844 SPO 2019 11 15 01 02 00 3862-99 S n2o CCGG 331.460 0.157 ... AR2 2020 01 22 10 53 32 -89.9800 -24.8000 2821.30 2810.00 11.30 469775 SPO 2019 11 15 01 02 00 5205-99 S n2o CCGG 331.450 0.157 ... AR2 2020 01 22 11 07 52 -89.9800 -24.8000 2821.30 2810.00 11.30 469776 SPO 2019 11 24 03 29 00 456-99 P n2o CCGG 331.470 0.157 ... AR2 2020 01 22 13 45 28 -89.9800 -24.8000 2815.00 2810.00 5.00 469841 SPO 2019 11 24 03 29 00 484-99 P n2o CCGG 331.390 0.157 ... AR2 2020 01 22 13 59 45 -89.9800 -24.8000 2815.00 2810.00 5.00 469842 SPO 2019 12 01 00 20 00 1511-99 P n2o CCGG 331.350 0.157 ... AR2 2020 01 22 12 48 14 -89.9800 -24.8000 2815.00 2810.00 5.00 469837 SPO 2019 12 01 00 20 00 4846-99 P n2o CCGG 331.370 0.157 ... AR2 2020 01 22 13 02 35 -89.9800 -24.8000 2815.00 2810.00 5.00 469838 SPO 2019 12 01 00 24 00 5650-99 S n2o CCGG 331.360 0.157 ... AR2 2020 01 22 13 16 52 -89.9800 -24.8000 2821.30 2810.00 11.30 469839 SPO 2019 12 01 00 24 00 5781-99 S n2o CCGG 331.390 0.157 ... AR2 2020 01 22 13 31 10 -89.9800 -24.8000 2821.30 2810.00 11.30 469840 SPO 2019 12 09 01 58 00 1169-99 P n2o CCGG 331.370 0.157 ... AR2 2020 02 05 15 52 51 -89.9800 -24.8000 2815.00 2810.00 5.00 469835 SPO 2019 12 09 01 58 00 2205-99 P n2o CCGG 331.360 0.157 ... AR2 2020 02 05 16 07 10 -89.9800 -24.8000 2815.00 2810.00 5.00 469836 SPO 2019 12 16 01 59 00 2188-99 P n2o CCGG 331.370 0.157 ... AR2 2020 03 13 13 42 06 -89.9800 -24.8000 2815.00 2810.00 5.00 471981 SPO 2019 12 16 01 59 00 5453-99 P n2o CCGG 331.280 0.157 ... AR2 2020 03 13 13 56 27 -89.9800 -24.8000 2815.00 2810.00 5.00 471982 SPO 2019 12 16 02 06 00 3058-99 S n2o CCGG 331.390 0.157 ... AR2 2020 03 13 15 36 30 -89.9800 -24.8000 2821.30 2810.00 11.30 471973 SPO 2019 12 16 02 06 00 4873-99 S n2o CCGG 331.370 0.157 ... AR2 2020 03 13 15 50 50 -89.9800 -24.8000 2821.30 2810.00 11.30 471974 SPO 2019 12 25 21 55 00 3725-99 P n2o CCGG 331.390 0.157 ... AR2 2020 03 13 15 07 55 -89.9800 -24.8000 2815.00 2810.00 5.00 471971 SPO 2019 12 25 21 55 00 5365-99 P n2o CCGG 331.360 0.157 ... AR2 2020 03 13 15 22 12 -89.9800 -24.8000 2815.00 2810.00 5.00 471972