# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: N2O CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Gobabeb Training and Research Center # collaborator_url: http://www.drfn.org/Gobabeb.html # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: nmb # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-07-24 11:39:11 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number NMB 1997 08 17 09 25 00 1117-91 P n2o CCGG 313.260 0.550 ... H4 1997 09 25 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 86571 NMB 1997 08 17 09 25 00 1118-91 P n2o CCGG 313.300 0.550 ... H4 1997 09 25 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 86572 NMB 1997 08 23 08 12 00 1777-91 P n2o CCGG 312.440 0.550 ... H4 1997 09 24 16 18 00 -23.5800 15.0300 461.00 456.00 5.00 86573 NMB 1997 08 23 08 12 00 1778-91 P n2o CCGG 313.140 0.550 ... H4 1997 09 24 16 31 00 -23.5800 15.0300 461.00 456.00 5.00 86574 NMB 1997 08 29 11 04 00 4621-91 P n2o CCGG 312.350 0.550 ... H4 1997 09 30 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 86575 NMB 1997 08 29 11 04 00 4622-91 P n2o CCGG 312.750 0.550 ... H4 1997 09 30 13 31 00 -23.5800 15.0300 461.00 456.00 5.00 86576 NMB 1997 09 05 10 35 00 4623-91 P n2o CCGG 312.790 0.550 ... H4 1997 09 30 12 24 00 -23.5800 15.0300 461.00 456.00 5.00 86577 NMB 1997 09 05 10 35 00 4624-91 P n2o CCGG 313.120 0.550 ... H4 1997 09 30 12 37 00 -23.5800 15.0300 461.00 456.00 5.00 86578 NMB 1997 09 24 12 50 00 4617-91 P n2o CCGG 312.640 0.550 ... H4 1997 10 28 15 56 00 -23.5800 15.0300 461.00 456.00 5.00 86579 NMB 1997 09 24 12 50 00 4618-91 P n2o CCGG 311.350 0.550 ... H4 1997 10 28 16 10 00 -23.5800 15.0300 461.00 456.00 5.00 86580 NMB 1997 10 02 12 15 00 4615-91 P n2o CCGG 314.080 0.550 ... H4 1997 10 28 16 23 00 -23.5800 15.0300 461.00 456.00 5.00 86581 NMB 1997 10 02 12 15 00 4616-91 P n2o CCGG 313.450 0.550 ... H4 1997 10 28 16 36 00 -23.5800 15.0300 461.00 456.00 5.00 86582 NMB 1997 10 08 11 00 00 695-91 P n2o CCGG 314.270 0.550 ... H4 1997 12 09 09 26 00 -23.5800 15.0300 461.00 456.00 5.00 86583 NMB 1997 10 08 11 00 00 696-91 P n2o CCGG 313.890 0.550 ... H4 1997 12 09 09 39 00 -23.5800 15.0300 461.00 456.00 5.00 86584 NMB 1997 10 26 12 00 00 1000-91 P n2o CCGG 312.720 0.550 ... H4 1997 12 09 11 55 00 -23.5800 15.0300 461.00 456.00 5.00 86586 NMB 1997 10 26 12 00 00 999-91 P n2o CCGG 312.640 0.550 ... H4 1997 12 09 11 41 00 -23.5800 15.0300 461.00 456.00 5.00 86585 NMB 1997 11 02 11 15 00 6407-66 P n2o CCGG 313.870 0.550 ... H4 1997 12 03 10 50 00 -23.5800 15.0300 461.00 456.00 5.00 86587 NMB 1997 11 02 11 15 00 6408-66 P n2o CCGG 313.750 0.550 ... H4 1997 12 03 11 04 00 -23.5800 15.0300 461.00 456.00 5.00 86588 NMB 1997 11 08 17 30 00 6933-66 P n2o CCGG 313.200 0.550 ... H4 1997 12 03 11 17 00 -23.5800 15.0300 461.00 456.00 5.00 86589 NMB 1997 11 08 17 30 00 6934-66 P n2o CCGG 312.460 0.550 ... H4 1997 12 03 11 30 00 -23.5800 15.0300 461.00 456.00 5.00 86590 NMB 1997 12 07 18 37 00 4528-91 P n2o CCGG 228.630 -999.990 N.. H4 1998 03 24 09 36 00 -23.5800 15.0300 461.00 456.00 5.00 86591 NMB 1997 12 07 18 37 00 4557-91 P n2o CCGG -999.990 -999.990 *.. H4 1998 03 24 09 50 00 -23.5800 15.0300 461.00 456.00 5.00 86592 NMB 1998 07 05 17 15 00 699-91 D n2o CCGG 312.980 0.550 ... H4 1998 08 20 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 86593 NMB 1998 07 05 17 15 00 700-91 D n2o CCGG 307.800 0.550 N.. H4 1998 08 20 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 86594 NMB 1998 07 10 10 33 00 1221-91 D n2o CCGG 314.790 0.550 ... H4 1998 08 20 14 31 00 -23.5800 15.0300 461.00 456.00 5.00 86595 NMB 1998 07 10 10 33 00 1222-91 D n2o CCGG 314.570 0.550 ... H4 1998 08 20 14 44 00 -23.5800 15.0300 461.00 456.00 5.00 86596 NMB 1998 07 17 17 45 00 175-91 D n2o CCGG 313.580 0.550 ... H4 1998 08 20 16 22 00 -23.5800 15.0300 461.00 456.00 5.00 86597 NMB 1998 07 24 17 45 00 227-91 D n2o CCGG 316.590 0.550 A.. H4 1998 08 19 13 16 00 -23.5800 15.0300 461.00 456.00 5.00 86598 NMB 1998 07 24 17 45 00 228-91 D n2o CCGG 314.650 0.550 ... H4 1998 08 19 13 29 00 -23.5800 15.0300 461.00 456.00 5.00 86599 NMB 1998 07 31 16 45 00 613-91 D n2o CCGG 314.110 0.550 ... H4 1998 09 11 12 24 00 -23.5800 15.0300 461.00 456.00 5.00 86600 NMB 1998 07 31 16 45 00 614-91 D n2o CCGG 313.620 0.550 ... H4 1998 09 11 12 38 00 -23.5800 15.0300 461.00 456.00 5.00 86601 NMB 1998 08 10 13 57 00 4359-91 D n2o CCGG 314.060 0.550 ... H4 1998 09 11 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 86602 NMB 1998 08 10 13 57 00 4360-91 D n2o CCGG 313.810 0.550 ... H4 1998 09 11 12 10 00 -23.5800 15.0300 461.00 456.00 5.00 86603 NMB 1998 08 21 18 45 00 181-91 D n2o CCGG 313.840 0.550 ... H4 1998 09 22 15 22 00 -23.5800 15.0300 461.00 456.00 5.00 86604 NMB 1998 08 21 18 45 00 182-91 D n2o CCGG 314.010 0.550 ... H4 1998 09 22 15 35 00 -23.5800 15.0300 461.00 456.00 5.00 86605 NMB 1998 08 28 18 45 00 1655-91 D n2o CCGG 312.530 0.550 ... H4 1998 09 22 14 54 00 -23.5800 15.0300 461.00 456.00 5.00 86606 NMB 1998 08 28 18 45 00 1656-91 D n2o CCGG 308.210 0.550 N.. H4 1998 09 22 15 08 00 -23.5800 15.0300 461.00 456.00 5.00 86607 NMB 1998 09 05 19 00 00 4597-91 D n2o CCGG 313.330 0.550 ... H4 1998 10 13 12 55 00 -23.5800 15.0300 461.00 456.00 5.00 86608 NMB 1998 09 05 19 00 00 4598-91 D n2o CCGG 312.980 0.550 ... H4 1998 10 13 13 09 00 -23.5800 15.0300 461.00 456.00 5.00 86609 NMB 1998 09 13 18 40 00 4589-91 D n2o CCGG 314.190 0.550 ... H4 1998 10 13 15 28 00 -23.5800 15.0300 461.00 456.00 5.00 86610 NMB 1998 09 13 18 40 00 4590-91 D n2o CCGG 314.230 0.550 ... H4 1998 10 13 15 42 00 -23.5800 15.0300 461.00 456.00 5.00 86611 NMB 1998 10 10 18 15 00 1027-91 D n2o CCGG 313.560 0.550 ... H4 1999 01 04 14 02 00 -23.5800 15.0300 461.00 456.00 5.00 86612 NMB 1998 10 10 18 15 00 1028-91 D n2o CCGG 313.610 0.550 ... H4 1999 01 04 14 16 00 -23.5800 15.0300 461.00 456.00 5.00 86613 NMB 1998 10 19 17 36 00 157-91 D n2o CCGG 314.140 0.550 ... H4 1999 01 04 14 30 00 -23.5800 15.0300 461.00 456.00 5.00 86614 NMB 1998 10 19 17 36 00 158-91 D n2o CCGG 314.070 0.550 ... H4 1999 01 04 14 43 00 -23.5800 15.0300 461.00 456.00 5.00 86615 NMB 1998 11 02 19 18 00 53-98 D n2o CCGG 313.710 0.550 ... H4 1998 12 30 09 35 00 -23.5800 15.0300 461.00 456.00 5.00 86616 NMB 1998 11 02 19 18 00 54-98 D n2o CCGG 313.530 0.550 ... H4 1998 12 30 09 49 00 -23.5800 15.0300 461.00 456.00 5.00 86617 NMB 1998 11 09 17 45 00 51-98 D n2o CCGG 313.670 0.550 ... H4 1998 12 30 09 08 00 -23.5800 15.0300 461.00 456.00 5.00 86618 NMB 1998 11 09 17 45 00 52-98 D n2o CCGG 313.800 0.550 ... H4 1998 12 30 09 21 00 -23.5800 15.0300 461.00 456.00 5.00 86619 NMB 1998 11 19 10 55 00 387-91 D n2o CCGG 314.780 0.550 ... H4 1999 01 05 13 25 00 -23.5800 15.0300 461.00 456.00 5.00 86620 NMB 1998 11 19 10 55 00 388-91 D n2o CCGG 314.840 0.550 ... H4 1999 01 05 13 39 00 -23.5800 15.0300 461.00 456.00 5.00 86621 NMB 1998 11 26 19 50 00 313-91 D n2o CCGG 313.920 0.550 ... H4 1999 01 05 12 58 00 -23.5800 15.0300 461.00 456.00 5.00 86622 NMB 1998 11 26 19 50 00 314-91 D n2o CCGG 313.850 0.550 ... H4 1999 01 05 13 12 00 -23.5800 15.0300 461.00 456.00 5.00 86623 NMB 1998 12 03 19 27 00 594-91 D n2o CCGG 313.710 0.550 ... H4 1999 03 05 12 07 00 -23.5800 15.0300 461.00 456.00 5.00 86624 NMB 1998 12 10 18 45 00 632-91 D n2o CCGG 313.480 0.550 ... H4 1999 03 05 11 53 00 -23.5800 15.0300 461.00 456.00 5.00 86625 NMB 1998 12 24 15 30 00 1631-91 D n2o CCGG 314.260 0.550 ... H4 1999 02 16 13 57 00 -23.5800 15.0300 461.00 456.00 5.00 86626 NMB 1998 12 24 15 30 00 1632-91 D n2o CCGG 313.750 0.550 ... H4 1999 02 16 14 11 00 -23.5800 15.0300 461.00 456.00 5.00 86627 NMB 1999 01 01 17 00 00 4357-91 D n2o CCGG 313.840 0.550 ... H4 1999 02 16 12 35 00 -23.5800 15.0300 461.00 456.00 5.00 86628 NMB 1999 01 01 17 00 00 4358-91 D n2o CCGG 314.350 0.550 ... H4 1999 02 16 12 49 00 -23.5800 15.0300 461.00 456.00 5.00 86629 NMB 1999 01 07 19 20 00 4221-91 D n2o CCGG 315.010 0.550 ... H4 1999 02 16 13 30 00 -23.5800 15.0300 461.00 456.00 5.00 86630 NMB 1999 01 07 19 20 00 4222-91 D n2o CCGG 314.720 0.550 ... H4 1999 02 16 13 43 00 -23.5800 15.0300 461.00 456.00 5.00 86631 NMB 1999 01 16 18 45 00 1025-91 D n2o CCGG 314.690 0.550 ... H4 1999 02 16 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 86632 NMB 1999 01 16 18 45 00 1026-91 D n2o CCGG 315.000 0.550 ... H4 1999 02 16 13 16 00 -23.5800 15.0300 461.00 456.00 5.00 86633 NMB 1999 02 05 18 55 00 649-91 D n2o CCGG 313.860 0.550 ... H4 1999 06 29 13 18 00 -23.5800 15.0300 461.00 456.00 5.00 86634 NMB 1999 02 05 18 55 00 650-91 D n2o CCGG 313.610 0.550 ... H4 1999 06 29 13 32 00 -23.5800 15.0300 461.00 456.00 5.00 86635 NMB 1999 02 12 20 50 00 51-98 D n2o CCGG 314.350 0.550 ... H4 1999 06 29 13 45 00 -23.5800 15.0300 461.00 456.00 5.00 86636 NMB 1999 02 12 20 50 00 52-98 D n2o CCGG 314.080 0.550 ... H4 1999 06 29 13 59 00 -23.5800 15.0300 461.00 456.00 5.00 86637 NMB 1999 02 27 08 00 00 603-91 D n2o CCGG 314.890 0.550 ... H4 1999 06 23 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 86638 NMB 1999 02 27 08 00 00 604-91 D n2o CCGG 315.210 0.550 ... H4 1999 06 23 13 15 00 -23.5800 15.0300 461.00 456.00 5.00 86639 NMB 1999 03 09 11 40 00 169-91 D n2o CCGG 314.840 0.550 ... H4 1999 06 23 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 86640 NMB 1999 03 09 11 40 00 170-91 D n2o CCGG 314.940 0.550 ... H4 1999 06 23 12 48 00 -23.5800 15.0300 461.00 456.00 5.00 86641 NMB 1999 04 15 16 25 00 373-91 D n2o CCGG 314.370 0.550 ... H4 1999 06 21 13 22 00 -23.5800 15.0300 461.00 456.00 5.00 86642 NMB 1999 04 15 16 25 00 374-91 D n2o CCGG 314.820 0.550 ... H4 1999 06 21 13 35 00 -23.5800 15.0300 461.00 456.00 5.00 86643 NMB 1999 04 23 17 27 00 555-91 D n2o CCGG 314.230 0.550 ... H4 1999 06 21 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 86644 NMB 1999 04 23 17 27 00 556-91 D n2o CCGG 314.030 0.550 ... H4 1999 06 21 14 03 00 -23.5800 15.0300 461.00 456.00 5.00 86645 NMB 1999 05 04 11 45 00 4103-91 D n2o CCGG 314.810 0.550 A.. H4 1999 12 20 13 26 00 -23.5800 15.0300 461.00 456.00 5.00 86646 NMB 1999 05 04 11 45 00 4104-91 D n2o CCGG 314.630 0.550 A.. H4 1999 12 20 13 40 00 -23.5800 15.0300 461.00 456.00 5.00 86647 NMB 1999 06 24 16 10 00 4731-91 D n2o CCGG 314.730 0.550 A.. H4 1999 12 20 12 59 00 -23.5800 15.0300 461.00 456.00 5.00 86648 NMB 1999 06 24 16 10 00 4732-91 D n2o CCGG 314.220 0.550 A.. H4 1999 12 20 13 13 00 -23.5800 15.0300 461.00 456.00 5.00 86649 NMB 1999 09 09 13 35 00 3-98 D n2o CCGG 315.560 0.550 A.. H4 1999 12 17 09 54 00 -23.5800 15.0300 461.00 456.00 5.00 86650 NMB 1999 09 09 13 35 00 4-98 D n2o CCGG 315.010 0.550 A.. H4 1999 12 17 10 08 00 -23.5800 15.0300 461.00 456.00 5.00 86651 NMB 1999 09 15 19 31 00 1000-91 D n2o CCGG 315.360 0.550 A.. H4 1999 12 17 10 35 00 -23.5800 15.0300 461.00 456.00 5.00 86653 NMB 1999 09 15 19 31 00 999-91 D n2o CCGG 315.440 0.550 A.. H4 1999 12 17 10 21 00 -23.5800 15.0300 461.00 456.00 5.00 86652 NMB 1999 09 30 12 23 00 4511-91 D n2o CCGG 315.000 0.550 A.. H4 1999 12 17 15 00 00 -23.5800 15.0300 461.00 456.00 5.00 86654 NMB 1999 09 30 12 23 00 4512-91 D n2o CCGG 314.880 0.550 A.. H4 1999 12 17 15 14 00 -23.5800 15.0300 461.00 456.00 5.00 86655 NMB 1999 11 16 18 12 00 21-91 D n2o CCGG 315.370 0.550 A.. H4 1999 12 17 14 32 00 -23.5800 15.0300 461.00 456.00 5.00 86656 NMB 1999 11 16 18 12 00 22-91 D n2o CCGG 315.640 0.550 A.. H4 1999 12 17 14 45 00 -23.5800 15.0300 461.00 456.00 5.00 86657 NMB 1999 11 23 18 20 00 575-91 D n2o CCGG 315.740 0.380 ... H4 2000 04 07 11 29 00 -23.5800 15.0300 461.00 456.00 5.00 86658 NMB 1999 11 23 18 20 00 576-91 D n2o CCGG 315.320 0.380 ... H4 2000 04 07 11 42 00 -23.5800 15.0300 461.00 456.00 5.00 86659 NMB 1999 12 03 20 13 00 319-91 D n2o CCGG 314.830 0.380 ... H4 2000 04 07 12 47 00 -23.5800 15.0300 461.00 456.00 5.00 86660 NMB 1999 12 03 20 13 00 320-91 D n2o CCGG 314.990 0.380 ... H4 2000 04 07 13 00 00 -23.5800 15.0300 461.00 456.00 5.00 86661 NMB 1999 12 07 18 45 00 1321-91 D n2o CCGG 315.360 0.380 ... H4 2000 04 04 10 22 00 -23.5800 15.0300 461.00 456.00 5.00 86662 NMB 1999 12 07 18 45 00 1322-91 D n2o CCGG 315.310 0.380 ... H4 2000 04 04 10 35 00 -23.5800 15.0300 461.00 456.00 5.00 86663 NMB 1999 12 14 18 50 00 621-91 D n2o CCGG 314.900 0.380 ... H4 2000 04 04 09 56 00 -23.5800 15.0300 461.00 456.00 5.00 86664 NMB 1999 12 14 18 50 00 622-91 D n2o CCGG 314.770 0.380 ... H4 2000 04 04 10 09 00 -23.5800 15.0300 461.00 456.00 5.00 86665 NMB 2000 01 07 11 35 00 395-91 D n2o CCGG 315.450 0.380 ... H4 2000 04 03 10 14 00 -23.5800 15.0300 461.00 456.00 5.00 86666 NMB 2000 01 07 11 35 00 396-91 D n2o CCGG 315.800 0.380 ... H4 2000 04 03 10 27 00 -23.5800 15.0300 461.00 456.00 5.00 86667 NMB 2000 01 13 11 55 00 1209-91 D n2o CCGG 315.340 0.380 ... H4 2000 04 03 11 06 00 -23.5800 15.0300 461.00 456.00 5.00 86668 NMB 2000 01 13 11 55 00 1210-91 D n2o CCGG 315.570 0.380 ... H4 2000 04 03 11 19 00 -23.5800 15.0300 461.00 456.00 5.00 86669 NMB 2000 02 18 17 07 00 199-98 D n2o CCGG 190.660 -999.990 N.. H4 2000 08 21 10 38 00 -23.5800 15.0300 461.00 456.00 5.00 86670 NMB 2000 02 18 17 07 00 200-98 D n2o CCGG 193.240 -999.990 N.. H4 2000 08 21 10 51 00 -23.5800 15.0300 461.00 456.00 5.00 86671 NMB 2000 03 03 12 34 56 4499-91 D n2o CCGG 312.130 0.380 A.. H4 2000 08 21 11 04 00 -23.5800 15.0300 461.00 456.00 5.00 86672 NMB 2000 03 03 12 34 56 4500-91 D n2o CCGG 314.700 0.380 ... H4 2000 08 21 11 17 00 -23.5800 15.0300 461.00 456.00 5.00 86673 NMB 2000 03 16 13 25 00 4497-91 D n2o CCGG 314.980 0.380 ... H4 2000 08 17 12 19 00 -23.5800 15.0300 461.00 456.00 5.00 86674 NMB 2000 03 16 13 25 00 4498-91 D n2o CCGG 314.970 0.380 ... H4 2000 08 17 12 32 00 -23.5800 15.0300 461.00 456.00 5.00 86675 NMB 2000 05 09 17 45 00 1117-91 D n2o CCGG 316.300 0.380 ... H4 2000 08 17 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 86676 NMB 2000 05 09 17 45 00 1118-91 D n2o CCGG 316.510 0.380 ... H4 2000 08 17 14 18 00 -23.5800 15.0300 461.00 456.00 5.00 86677 NMB 2000 05 16 17 48 00 489-91 D n2o CCGG 315.640 0.380 ... H4 2000 08 17 13 39 00 -23.5800 15.0300 461.00 456.00 5.00 86678 NMB 2000 05 16 17 48 00 490-91 D n2o CCGG 315.300 0.380 ... H4 2000 08 17 13 52 00 -23.5800 15.0300 461.00 456.00 5.00 86679 NMB 2000 06 06 17 20 00 25-91 D n2o CCGG 314.820 0.380 ... H4 2000 08 21 11 30 00 -23.5800 15.0300 461.00 456.00 5.00 86680 NMB 2000 06 06 17 20 00 26-91 D n2o CCGG 315.310 0.380 ... H4 2000 08 21 11 43 00 -23.5800 15.0300 461.00 456.00 5.00 86681 NMB 2000 06 17 14 47 00 4061-91 D n2o CCGG 315.670 0.380 ... H4 2000 08 21 10 12 00 -23.5800 15.0300 461.00 456.00 5.00 86682 NMB 2000 06 17 14 47 00 4062-91 D n2o CCGG 297.590 -999.990 N.. H4 2000 08 21 10 25 00 -23.5800 15.0300 461.00 456.00 5.00 86683 NMB 2000 12 05 11 15 00 1363-91 D n2o CCGG 316.410 0.260 ... H4 2001 03 22 09 26 00 -23.5800 15.0300 461.00 456.00 5.00 86684 NMB 2000 12 05 11 15 00 1364-91 D n2o CCGG 316.780 0.260 ... H4 2001 03 22 09 39 00 -23.5800 15.0300 461.00 456.00 5.00 86685 NMB 2000 12 15 17 55 00 527-91 D n2o CCGG 316.550 0.260 ... H4 2001 03 22 10 48 00 -23.5800 15.0300 461.00 456.00 5.00 86686 NMB 2000 12 15 17 55 00 528-91 D n2o CCGG 316.470 0.260 ... H4 2001 03 22 11 01 00 -23.5800 15.0300 461.00 456.00 5.00 86687 NMB 2000 12 27 17 30 00 4735-91 D n2o CCGG 316.520 0.260 ... H4 2001 03 22 12 08 00 -23.5800 15.0300 461.00 456.00 5.00 86688 NMB 2000 12 27 17 30 00 4736-91 D n2o CCGG 315.960 0.260 ... H4 2001 03 22 12 21 00 -23.5800 15.0300 461.00 456.00 5.00 86689 NMB 2001 01 02 09 00 00 4363-91 D n2o CCGG 316.010 0.260 ... H4 2001 03 22 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 86690 NMB 2001 01 02 09 00 00 4364-91 D n2o CCGG 316.370 0.260 ... H4 2001 03 22 12 47 00 -23.5800 15.0300 461.00 456.00 5.00 86691 NMB 2001 01 10 10 30 00 4297-91 D n2o CCGG 315.730 0.260 ... H4 2001 03 21 14 01 00 -23.5800 15.0300 461.00 456.00 5.00 86692 NMB 2001 01 10 10 30 00 4298-91 D n2o CCGG 316.310 0.260 ... H4 2001 03 21 14 14 00 -23.5800 15.0300 461.00 456.00 5.00 86693 NMB 2001 01 18 10 30 00 1987-91 D n2o CCGG 315.380 0.260 ... H4 2001 03 21 13 35 00 -23.5800 15.0300 461.00 456.00 5.00 86694 NMB 2001 01 18 10 30 00 1988-91 D n2o CCGG 315.370 0.260 ... H4 2001 03 21 13 48 00 -23.5800 15.0300 461.00 456.00 5.00 86695 NMB 2001 01 29 19 13 00 1509-91 D n2o CCGG 312.200 0.260 N.. H4 2001 03 27 14 42 00 -23.5800 15.0300 461.00 456.00 5.00 86696 NMB 2001 01 29 19 13 00 1510-91 D n2o CCGG 310.360 0.260 N.. H4 2001 03 27 14 56 00 -23.5800 15.0300 461.00 456.00 5.00 86697 NMB 2001 02 08 09 30 00 1061-91 D n2o CCGG 315.340 0.260 ... H4 2001 03 27 14 16 00 -23.5800 15.0300 461.00 456.00 5.00 86698 NMB 2001 02 08 09 30 00 1062-91 D n2o CCGG 312.280 0.260 N.. H4 2001 03 27 14 29 00 -23.5800 15.0300 461.00 456.00 5.00 86699 NMB 2001 02 14 09 30 00 4315-91 D n2o CCGG 316.560 0.260 ... H4 2001 03 23 14 55 00 -23.5800 15.0300 461.00 456.00 5.00 86700 NMB 2001 02 14 09 30 00 4316-91 D n2o CCGG 314.090 0.260 N.. H4 2001 03 23 15 08 00 -23.5800 15.0300 461.00 456.00 5.00 86701 NMB 2001 02 21 10 30 00 4189-91 D n2o CCGG 316.090 0.260 ... H4 2001 03 23 15 21 00 -23.5800 15.0300 461.00 456.00 5.00 86702 NMB 2001 02 21 10 30 00 4190-91 D n2o CCGG 313.300 0.260 N.. H4 2001 03 23 15 34 00 -23.5800 15.0300 461.00 456.00 5.00 86703 NMB 2006 08 22 04 03 00 520-99 P n2o CCGG 309.240 0.260 N.. H4 2006 10 05 11 43 00 -23.5600 15.0100 461.00 456.00 5.00 222973 NMB 2006 08 22 04 03 00 69-99 P n2o CCGG 172.600 -999.990 N.. H4 2006 10 05 11 57 00 -23.5600 15.0100 461.00 456.00 5.00 222974 NMB 2006 08 30 06 08 00 519-99 P n2o CCGG 319.920 0.260 ... H4 2006 10 05 11 15 00 -23.5600 15.0100 461.00 456.00 5.00 222975 NMB 2006 08 30 06 08 00 70-99 P n2o CCGG 320.080 0.260 ... H4 2006 10 05 11 29 00 -23.5600 15.0100 461.00 456.00 5.00 222976 NMB 2006 09 05 15 17 00 4250-91 P n2o CCGG 319.910 0.260 ... H4 2006 10 20 14 56 00 -23.5600 15.0100 461.00 456.00 5.00 223747 NMB 2006 09 05 15 17 00 845-91 P n2o CCGG 319.720 0.260 ... H4 2006 10 20 14 41 00 -23.5600 15.0100 461.00 456.00 5.00 223746 NMB 2006 09 17 15 25 00 4249-91 P n2o CCGG 303.610 0.260 N.. H4 2006 10 20 14 27 00 -23.5600 15.0100 461.00 456.00 5.00 223749 NMB 2006 09 17 15 25 00 846-91 P n2o CCGG 319.750 0.260 ... H4 2006 10 20 14 13 00 -23.5600 15.0100 461.00 456.00 5.00 223748 NMB 2006 10 13 14 02 00 2339-99 P n2o CCGG 320.250 0.260 ... H4 2006 12 05 14 44 00 -23.5600 15.0100 461.00 456.00 5.00 225665 NMB 2006 10 13 14 02 00 2505-99 P n2o CCGG 320.020 0.260 ... H4 2006 12 05 14 29 00 -23.5600 15.0100 461.00 456.00 5.00 225666 NMB 2006 11 10 15 42 00 3568-99 P n2o CCGG 320.620 0.260 ... H4 2006 12 05 14 58 00 -23.5600 15.0100 461.00 456.00 5.00 225663 NMB 2006 11 10 15 42 00 4027-99 P n2o CCGG 319.620 0.260 ... H4 2006 12 05 15 12 00 -23.5600 15.0100 461.00 456.00 5.00 225664 NMB 2007 02 03 18 00 00 2794-99 P n2o CCGG 323.710 0.260 .X. H4 2007 03 16 13 22 00 -23.5600 15.0100 461.00 456.00 5.00 230695 NMB 2007 02 03 18 00 00 3222-99 P n2o CCGG 323.310 0.260 .X. H4 2007 03 16 13 08 00 -23.5600 15.0100 461.00 456.00 5.00 230694 NMB 2007 02 19 17 33 00 2793-99 P n2o CCGG 323.750 0.260 .X. H4 2007 03 16 13 50 00 -23.5600 15.0100 461.00 456.00 5.00 230693 NMB 2007 02 19 17 33 00 3221-99 P n2o CCGG 323.730 0.260 .X. H4 2007 03 16 13 36 00 -23.5600 15.0100 461.00 456.00 5.00 230692 NMB 2007 03 08 10 38 00 1369-91 P n2o CCGG 321.070 0.260 ... H4 2007 04 02 12 58 00 -23.5600 15.0100 461.00 456.00 5.00 231738 NMB 2007 03 08 10 38 00 4113-91 P n2o CCGG 320.540 0.260 ... H4 2007 04 02 13 12 00 -23.5600 15.0100 461.00 456.00 5.00 231739 NMB 2007 03 15 17 15 00 3567-99 P n2o CCGG 329.970 0.260 N.. H4 2007 04 12 13 53 00 -23.5600 15.0100 461.00 456.00 5.00 232146 NMB 2007 03 15 17 15 00 4028-99 P n2o CCGG 331.820 0.260 N.. H4 2007 04 12 14 07 00 -23.5600 15.0100 461.00 456.00 5.00 232145 NMB 2007 03 23 08 15 00 2340-99 P n2o CCGG 321.050 0.260 ... H4 2007 04 12 13 25 00 -23.5600 15.0100 461.00 456.00 5.00 232143 NMB 2007 03 23 08 15 00 2506-99 P n2o CCGG 321.380 0.260 ... H4 2007 04 12 13 39 00 -23.5600 15.0100 461.00 456.00 5.00 232144 NMB 2007 03 30 17 10 00 3606-99 P n2o CCGG 321.070 0.260 ... H4 2007 05 22 16 05 00 -23.5600 15.0100 461.00 456.00 5.00 234360 NMB 2007 03 30 17 10 00 689-99 P n2o CCGG 321.420 0.260 ... H4 2007 05 22 16 19 00 -23.5600 15.0100 461.00 456.00 5.00 234361 NMB 2007 04 08 08 33 00 3605-99 P n2o CCGG 322.390 0.260 ... H4 2007 05 22 15 36 00 -23.5600 15.0100 461.00 456.00 5.00 234362 NMB 2007 04 08 08 33 00 690-99 P n2o CCGG 321.890 0.260 ... H4 2007 05 22 15 50 00 -23.5600 15.0100 461.00 456.00 5.00 234363 NMB 2007 04 15 16 35 00 1072-99 P n2o CCGG 323.420 0.260 .X. H4 2007 05 22 15 08 00 -23.5600 15.0100 461.00 456.00 5.00 234356 NMB 2007 04 15 16 35 00 1753-99 P n2o CCGG 322.790 0.260 .X. H4 2007 05 22 15 22 00 -23.5600 15.0100 461.00 456.00 5.00 234357 NMB 2007 04 20 08 50 00 1071-99 P n2o CCGG 319.970 0.260 ... H4 2007 05 22 14 39 00 -23.5600 15.0100 461.00 456.00 5.00 234358 NMB 2007 04 20 08 50 00 1754-99 P n2o CCGG 319.980 0.260 ... H4 2007 05 22 14 53 00 -23.5600 15.0100 461.00 456.00 5.00 234359 NMB 2007 04 29 17 00 00 197-91 P n2o CCGG 320.910 0.260 ... H4 2007 06 18 09 44 00 -23.5600 15.0100 461.00 456.00 5.00 235885 NMB 2007 04 29 17 00 00 198-91 P n2o CCGG 320.690 0.260 ... H4 2007 06 18 09 58 00 -23.5600 15.0100 461.00 456.00 5.00 235886 NMB 2007 05 16 10 43 00 196-91 P n2o CCGG 320.570 0.260 ... H4 2007 06 18 11 09 00 -23.5600 15.0100 461.00 456.00 5.00 235891 NMB 2007 05 16 10 43 00 519-91 P n2o CCGG 320.190 0.260 ... H4 2007 06 18 11 24 00 -23.5600 15.0100 461.00 456.00 5.00 235892 NMB 2007 05 24 15 50 00 195-91 P n2o CCGG 319.990 0.260 ... H4 2007 06 18 10 55 00 -23.5600 15.0100 461.00 456.00 5.00 235890 NMB 2007 05 24 15 50 00 520-91 P n2o CCGG 318.640 0.260 A.. H4 2007 06 18 10 41 00 -23.5600 15.0100 461.00 456.00 5.00 235889 NMB 2007 06 01 06 40 00 395-91 P n2o CCGG 321.020 0.260 ... H4 2007 06 18 10 13 00 -23.5600 15.0100 461.00 456.00 5.00 235887 NMB 2007 06 01 06 40 00 396-91 P n2o CCGG 320.900 0.260 ... H4 2007 06 18 10 27 00 -23.5600 15.0100 461.00 456.00 5.00 235888 NMB 2007 06 08 15 30 00 1067-99 P n2o CCGG 319.370 0.260 ... H4 2007 07 19 15 08 00 -23.5600 15.0100 461.00 456.00 5.00 238513 NMB 2007 06 08 15 30 00 455-99 P n2o CCGG 319.920 0.260 ... H4 2007 07 19 15 23 00 -23.5600 15.0100 461.00 456.00 5.00 238514 NMB 2007 06 22 13 50 00 1068-99 P n2o CCGG 321.200 0.260 ... H4 2007 07 20 09 14 00 -23.5600 15.0100 461.00 456.00 5.00 238511 NMB 2007 06 22 13 50 00 456-99 P n2o CCGG 321.320 0.260 ... H4 2007 07 20 09 28 00 -23.5600 15.0100 461.00 456.00 5.00 238512 NMB 2007 06 28 13 54 00 4784-99 P n2o CCGG 320.500 0.260 ... H4 2007 07 19 14 40 00 -23.5600 15.0100 461.00 456.00 5.00 238507 NMB 2007 06 28 13 54 00 629-99 P n2o CCGG 320.170 0.260 ... H4 2007 07 19 14 54 00 -23.5600 15.0100 461.00 456.00 5.00 238508 NMB 2007 07 05 13 51 00 4783-99 P n2o CCGG 319.510 0.260 ... H4 2007 07 19 15 51 00 -23.5600 15.0100 461.00 456.00 5.00 238510 NMB 2007 07 05 13 51 00 630-99 P n2o CCGG 320.100 0.260 ... H4 2007 07 19 15 37 00 -23.5600 15.0100 461.00 456.00 5.00 238509 NMB 2007 07 16 09 15 00 4781-99 P n2o CCGG 320.200 0.260 ... H4 2007 09 10 13 17 00 -23.5600 15.0100 461.00 456.00 5.00 241271 NMB 2007 07 16 09 15 00 687-99 P n2o CCGG 320.310 0.260 ... H4 2007 09 10 13 31 00 -23.5600 15.0100 461.00 456.00 5.00 241272 NMB 2007 08 03 14 14 00 4103-99 P n2o CCGG 320.370 0.260 ... H4 2007 09 10 14 28 00 -23.5600 15.0100 461.00 456.00 5.00 241266 NMB 2007 08 03 14 14 00 522-99 P n2o CCGG 321.130 0.260 ... H4 2007 09 10 14 14 00 -23.5600 15.0100 461.00 456.00 5.00 241265 NMB 2007 08 12 15 15 00 2559-99 P n2o CCGG 320.430 0.260 ... H6 2007 09 10 13 36 00 -23.5600 15.0100 461.00 456.00 5.00 241267 NMB 2007 08 12 15 15 00 447-99 P n2o CCGG 320.520 0.260 ... H6 2007 09 10 13 50 00 -23.5600 15.0100 461.00 456.00 5.00 241268 NMB 2007 08 17 14 05 00 4782-99 P n2o CCGG 319.670 0.260 ... H4 2007 09 11 13 09 00 -23.5600 15.0100 461.00 456.00 5.00 241369 NMB 2007 08 17 14 05 00 688-99 P n2o CCGG 320.000 0.260 ... H4 2007 09 11 13 24 00 -23.5600 15.0100 461.00 456.00 5.00 241370 NMB 2007 08 24 06 39 00 1130-99 P n2o CCGG 319.460 0.260 ... H4 2007 09 11 13 38 00 -23.5600 15.0100 461.00 456.00 5.00 241367 NMB 2007 08 24 06 39 00 1132-99 P n2o CCGG 319.410 0.260 ... H4 2007 09 11 13 52 00 -23.5600 15.0100 461.00 456.00 5.00 241368 NMB 2007 08 31 11 12 00 2891-99 P n2o CCGG 320.470 0.260 ... H4 2007 09 10 13 46 00 -23.5600 15.0100 461.00 456.00 5.00 241269 NMB 2007 08 31 11 12 00 633-99 P n2o CCGG 320.790 0.260 ... H4 2007 09 10 14 00 00 -23.5600 15.0100 461.00 456.00 5.00 241270 NMB 2007 09 06 07 40 00 198-99 P n2o CCGG 320.640 0.260 ... H4 2007 10 03 11 19 00 -23.5600 15.0100 461.00 456.00 5.00 242613 NMB 2007 09 06 07 40 00 361-99 P n2o CCGG 320.850 0.260 ... H4 2007 10 03 11 05 00 -23.5600 15.0100 461.00 456.00 5.00 242612 NMB 2007 09 19 12 36 00 197-99 P n2o CCGG 319.160 0.260 N.. H4 2007 10 03 11 47 00 -23.5600 15.0100 461.00 456.00 5.00 242610 NMB 2007 09 19 12 36 00 362-99 P n2o CCGG 320.890 0.260 N.. H4 2007 10 03 11 33 00 -23.5600 15.0100 461.00 456.00 5.00 242611 NMB 2007 12 14 09 55 00 255-91 P n2o CCGG 322.350 0.260 ... H4 2008 01 22 14 27 00 -23.5700 15.0200 461.00 456.00 5.00 248011 NMB 2007 12 14 09 55 00 256-91 P n2o CCGG 321.990 0.260 ... H4 2008 01 22 14 42 00 -23.5700 15.0200 461.00 456.00 5.00 248012 NMB 2007 12 28 15 30 00 489-91 P n2o CCGG 321.530 0.260 ... H4 2008 01 22 14 56 00 -23.5700 15.0200 461.00 456.00 5.00 248013 NMB 2007 12 28 15 30 00 490-91 P n2o CCGG 321.480 0.260 ... H4 2008 01 22 15 10 00 -23.5700 15.0200 461.00 456.00 5.00 248014 NMB 2008 01 03 16 40 00 73-91 P n2o CCGG 321.880 0.260 ... H4 2008 02 26 13 51 00 -23.5700 15.0200 461.00 456.00 5.00 249999 NMB 2008 01 03 16 40 00 74-91 P n2o CCGG 321.430 0.260 ... H4 2008 02 26 14 05 00 -23.5700 15.0200 461.00 456.00 5.00 250000 NMB 2008 01 18 16 15 00 2108-99 P n2o CCGG 321.220 0.260 ... H4 2008 02 26 14 33 00 -23.5700 15.0200 461.00 456.00 5.00 249998 NMB 2008 01 18 16 15 00 4655-99 P n2o CCGG 321.120 0.260 ... H4 2008 02 26 14 19 00 -23.5700 15.0200 461.00 456.00 5.00 249997 NMB 2008 01 21 16 50 00 2506-99 P n2o CCGG 321.260 0.260 ... H4 2008 02 26 12 54 00 -23.5700 15.0200 461.00 456.00 5.00 249993 NMB 2008 01 21 16 50 00 2865-99 P n2o CCGG 320.780 0.260 ... H4 2008 02 26 13 08 00 -23.5700 15.0200 461.00 456.00 5.00 249994 NMB 2008 01 31 16 50 00 1754-99 P n2o CCGG 321.700 0.260 ... H4 2008 02 26 13 22 00 -23.5700 15.0200 461.00 456.00 5.00 249995 NMB 2008 01 31 16 50 00 4166-99 P n2o CCGG 321.530 0.260 ... H4 2008 02 26 13 36 00 -23.5700 15.0200 461.00 456.00 5.00 249996 NMB 2008 06 02 14 32 00 1753-99 P n2o CCGG 320.370 0.260 ... H4 2008 07 09 09 45 00 -23.5800 15.0300 461.00 456.00 5.00 256999 NMB 2008 06 02 14 32 00 4165-99 P n2o CCGG 320.720 0.260 ... H4 2008 07 09 09 31 00 -23.5800 15.0300 461.00 456.00 5.00 256998 NMB 2008 06 13 15 31 00 545-91 P n2o CCGG 320.900 0.260 ... H4 2008 07 09 09 02 00 -23.5800 15.0300 461.00 456.00 5.00 257000 NMB 2008 06 13 15 31 00 546-91 P n2o CCGG 321.290 0.260 ... H4 2008 07 09 09 17 00 -23.5800 15.0300 461.00 456.00 5.00 257001 NMB 2008 06 20 11 11 00 4155-91 P n2o CCGG 320.960 0.260 ... H4 2008 07 08 17 23 00 -23.5800 15.0300 461.00 456.00 5.00 256996 NMB 2008 06 20 11 11 00 4156-91 P n2o CCGG 321.020 0.260 ... H4 2008 07 08 17 37 00 -23.5800 15.0300 461.00 456.00 5.00 256997 NMB 2008 06 24 17 30 00 189-91 P n2o CCGG 322.520 0.260 ... H4 2008 07 08 16 54 00 -23.5800 15.0300 461.00 456.00 5.00 256994 NMB 2008 06 24 17 30 00 190-91 P n2o CCGG 322.190 0.260 ... H4 2008 07 08 17 09 00 -23.5800 15.0300 461.00 456.00 5.00 256995 NMB 2008 07 18 17 20 00 4101-91 P n2o CCGG 321.710 0.260 ... H6 2008 08 06 15 03 00 -23.5800 15.0300 461.00 456.00 5.00 258714 NMB 2008 07 18 17 20 00 4102-91 P n2o CCGG 321.800 0.260 ... H6 2008 08 06 15 19 00 -23.5800 15.0300 461.00 456.00 5.00 258715 NMB 2008 07 22 16 50 00 281-99 P n2o CCGG 322.140 0.260 ... H6 2008 08 07 11 32 00 -23.5800 15.0300 461.00 456.00 5.00 258720 NMB 2008 07 22 16 50 00 282-99 P n2o CCGG 322.030 0.260 ... H6 2008 08 07 11 47 00 -23.5800 15.0300 461.00 456.00 5.00 258721 NMB 2008 07 31 16 00 00 4791-91 P n2o CCGG 322.020 0.260 ... H4 2008 09 03 13 47 00 -23.5800 15.0300 461.00 456.00 5.00 260006 NMB 2008 07 31 16 00 00 4792-91 P n2o CCGG 321.170 0.260 ... H4 2008 09 03 14 01 00 -23.5800 15.0300 461.00 456.00 5.00 260007 NMB 2008 08 07 12 34 56 191-98 P n2o CCGG 323.270 0.260 .X. H4 2008 09 03 14 15 00 -23.5800 15.0300 461.00 456.00 5.00 260008 NMB 2008 08 07 12 34 56 192-98 P n2o CCGG 323.240 0.260 .X. H4 2008 09 03 14 30 00 -23.5800 15.0300 461.00 456.00 5.00 260009 NMB 2008 08 14 15 50 00 1857-99 P n2o CCGG 322.130 0.260 ... H4 2008 09 17 11 06 00 -23.5800 15.0300 461.00 456.00 5.00 260891 NMB 2008 08 14 15 50 00 1858-99 P n2o CCGG 322.320 0.260 ... H4 2008 09 17 11 20 00 -23.5800 15.0300 461.00 456.00 5.00 260892 NMB 2008 08 23 12 20 00 1091-99 P n2o CCGG 320.720 0.260 ... H4 2008 09 17 10 09 00 -23.5800 15.0300 461.00 456.00 5.00 260893 NMB 2008 08 23 12 20 00 1092-99 P n2o CCGG 321.350 0.260 ... H4 2008 09 17 10 23 00 -23.5800 15.0300 461.00 456.00 5.00 260894 NMB 2008 08 28 14 40 00 1513-99 P n2o CCGG 320.780 0.260 ... H4 2008 10 07 10 26 00 -23.5800 15.0300 461.00 456.00 5.00 261933 NMB 2008 08 28 14 40 00 3165-99 P n2o CCGG 320.630 0.260 ... H4 2008 10 07 10 41 00 -23.5800 15.0300 461.00 456.00 5.00 261934 NMB 2008 09 02 16 52 00 87-99 P n2o CCGG 321.400 0.260 ... H4 2008 10 07 10 12 00 -23.5800 15.0300 461.00 456.00 5.00 261932 NMB 2008 09 02 16 52 00 900-99 P n2o CCGG 321.380 0.260 ... H4 2008 10 07 09 58 00 -23.5800 15.0300 461.00 456.00 5.00 261931 NMB 2008 09 09 16 42 00 943-99 P n2o CCGG 321.220 0.260 ... H4 2008 10 07 08 24 00 -23.5800 15.0300 461.00 456.00 5.00 261935 NMB 2008 09 09 16 42 00 944-99 P n2o CCGG 321.470 0.260 ... H4 2008 10 07 08 38 00 -23.5800 15.0300 461.00 456.00 5.00 261936 NMB 2008 09 17 14 40 00 4770-99 P n2o CCGG 321.410 0.260 ... H4 2008 10 14 13 50 00 -23.5800 15.0300 461.00 456.00 5.00 261937 NMB 2008 09 26 12 34 56 3029-99 P n2o CCGG 321.440 0.260 ... H6 2008 10 15 17 28 00 -23.5800 15.0300 461.00 456.00 5.00 262384 NMB 2008 09 26 12 34 56 671-99 P n2o CCGG 321.190 0.260 ... H6 2008 10 15 17 12 00 -23.5800 15.0300 461.00 456.00 5.00 262383 NMB 2008 10 02 12 34 56 6078-66 P n2o CCGG 320.920 0.260 ... H6 2008 10 15 16 42 00 -23.5800 15.0300 461.00 456.00 5.00 262385 NMB 2008 10 02 12 34 56 6621-66 P n2o CCGG 320.890 0.260 ... H6 2008 10 15 16 57 00 -23.5800 15.0300 461.00 456.00 5.00 262386 NMB 2008 10 07 13 41 00 339-99 P n2o CCGG 321.250 0.260 ... H6 2008 11 04 16 57 00 -23.5800 15.0300 461.00 456.00 5.00 263401 NMB 2008 10 07 13 41 00 340-99 P n2o CCGG 321.140 0.260 ... H6 2008 11 04 17 13 00 -23.5800 15.0300 461.00 456.00 5.00 263402 NMB 2008 10 16 16 15 00 2975-99 P n2o CCGG 320.960 0.260 ... H6 2008 11 04 16 27 00 -23.5800 15.0300 461.00 456.00 5.00 263403 NMB 2008 10 16 16 15 00 2976-99 P n2o CCGG 321.150 0.260 ... H6 2008 11 04 16 42 00 -23.5800 15.0300 461.00 456.00 5.00 263404 NMB 2008 10 22 16 49 00 1497-99 P n2o CCGG 321.270 0.260 ... H6 2008 11 11 13 58 00 -23.5800 15.0300 461.00 456.00 5.00 263786 NMB 2008 10 22 16 49 00 3974-99 P n2o CCGG 321.370 0.260 ... H6 2008 11 11 13 42 00 -23.5800 15.0300 461.00 456.00 5.00 263785 NMB 2008 10 29 16 15 00 2462-99 P n2o CCGG 321.830 0.260 ... H6 2008 11 11 13 27 00 -23.5800 15.0300 461.00 456.00 5.00 263784 NMB 2008 10 29 16 15 00 70-99 P n2o CCGG 321.600 0.260 ... H6 2008 11 11 13 11 00 -23.5800 15.0300 461.00 456.00 5.00 263783 NMB 2008 11 05 16 20 00 220-99 P n2o CCGG 321.440 0.260 ... H4 2008 12 11 11 54 00 -23.5800 15.0300 461.00 456.00 5.00 265193 NMB 2008 11 05 16 20 00 4911-99 P n2o CCGG 321.660 0.260 ... H4 2008 12 11 12 08 00 -23.5800 15.0300 461.00 456.00 5.00 265194 NMB 2008 11 13 16 32 00 1224-91 P n2o CCGG 321.110 0.260 ... H4 2008 12 11 12 23 00 -23.5800 15.0300 461.00 456.00 5.00 265191 NMB 2008 11 13 16 32 00 219-99 P n2o CCGG 321.450 0.260 ... H4 2008 12 11 12 37 00 -23.5800 15.0300 461.00 456.00 5.00 265192 NMB 2008 11 21 16 25 00 129-99 P n2o CCGG 321.350 0.260 ... H4 2008 12 11 10 53 00 -23.5800 15.0300 461.00 456.00 5.00 265189 NMB 2008 11 21 16 25 00 130-99 P n2o CCGG 321.730 0.260 ... H4 2008 12 11 11 07 00 -23.5800 15.0300 461.00 456.00 5.00 265190 NMB 2008 11 25 14 19 00 115-99 P n2o CCGG 321.860 0.260 ... H4 2008 12 11 11 26 00 -23.5800 15.0300 461.00 456.00 5.00 265187 NMB 2008 11 25 14 19 00 116-99 P n2o CCGG 321.920 0.260 ... H4 2008 12 11 11 40 00 -23.5800 15.0300 461.00 456.00 5.00 265188 NMB 2008 12 01 10 34 00 4903-99 P n2o CCGG 321.790 0.260 ... H4 2009 01 30 14 15 00 -23.5800 15.0300 461.00 456.00 5.00 268383 NMB 2008 12 01 10 34 00 4904-99 P n2o CCGG 322.080 0.260 ... H4 2009 01 30 14 29 00 -23.5800 15.0300 461.00 456.00 5.00 268384 NMB 2008 12 09 14 45 00 3303-99 P n2o CCGG 322.020 0.260 ... H4 2009 01 30 14 43 00 -23.5800 15.0300 461.00 456.00 5.00 268381 NMB 2008 12 09 14 45 00 3304-99 P n2o CCGG 322.680 0.260 ... H4 2009 01 30 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 268382 NMB 2008 12 17 16 00 00 4631-99 P n2o CCGG 322.480 0.260 ... H4 2009 01 30 15 40 00 -23.5800 15.0300 461.00 456.00 5.00 268387 NMB 2008 12 17 16 00 00 4632-99 P n2o CCGG 322.180 0.260 ... H4 2009 01 30 15 55 00 -23.5800 15.0300 461.00 456.00 5.00 268388 NMB 2008 12 22 16 43 00 2861-99 P n2o CCGG 322.900 0.260 ... H4 2009 01 30 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 268385 NMB 2008 12 22 16 43 00 2862-99 P n2o CCGG 322.350 0.260 ... H4 2009 01 30 15 26 00 -23.5800 15.0300 461.00 456.00 5.00 268386 NMB 2009 01 02 15 58 00 2795-99 P n2o CCGG 321.550 0.260 ... H4 2009 02 11 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 269102 NMB 2009 01 02 15 58 00 2796-99 P n2o CCGG 321.290 0.260 ... H4 2009 02 11 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 269103 NMB 2009 01 07 16 17 00 2491-99 P n2o CCGG 321.650 0.260 ... H4 2009 02 11 12 59 00 -23.5800 15.0300 461.00 456.00 5.00 269100 NMB 2009 01 07 16 17 00 2492-99 P n2o CCGG 321.380 0.260 ... H4 2009 02 11 13 13 00 -23.5800 15.0300 461.00 456.00 5.00 269101 NMB 2009 01 17 16 20 00 4763-99 P n2o CCGG 321.790 0.260 ... H4 2009 02 11 13 27 00 -23.5800 15.0300 461.00 456.00 5.00 269098 NMB 2009 01 17 16 20 00 4764-99 P n2o CCGG 322.000 0.260 ... H4 2009 02 11 13 42 00 -23.5800 15.0300 461.00 456.00 5.00 269099 NMB 2009 01 21 16 31 00 1813-99 P n2o CCGG 322.040 0.260 ... H4 2009 02 11 12 02 00 -23.5800 15.0300 461.00 456.00 5.00 269096 NMB 2009 01 21 16 31 00 1814-99 P n2o CCGG 322.120 0.260 ... H4 2009 02 11 12 16 00 -23.5800 15.0300 461.00 456.00 5.00 269097 NMB 2009 01 29 16 30 00 55-99 P n2o CCGG 322.820 0.260 ... H6 2009 04 01 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 272569 NMB 2009 01 29 16 30 00 56-99 P n2o CCGG 322.640 0.260 ... H6 2009 04 01 14 20 00 -23.5800 15.0300 461.00 456.00 5.00 272570 NMB 2009 02 04 16 30 00 4889-99 P n2o CCGG 323.610 0.260 ... H6 2009 04 01 13 34 00 -23.5800 15.0300 461.00 456.00 5.00 272567 NMB 2009 02 04 16 30 00 4890-99 P n2o CCGG 323.330 0.260 ... H6 2009 04 01 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 272568 NMB 2009 02 09 18 02 00 4939-99 P n2o CCGG 322.260 0.260 ... H6 2009 05 13 14 54 00 -23.5800 15.0300 461.00 456.00 5.00 275185 NMB 2009 02 09 18 02 00 4940-99 P n2o CCGG 322.510 0.260 ... H6 2009 05 13 15 09 00 -23.5800 15.0300 461.00 456.00 5.00 275186 NMB 2009 03 27 18 01 00 4981-99 P n2o CCGG 323.550 0.260 ... H6 2009 05 13 14 23 00 -23.5800 15.0300 461.00 456.00 5.00 275183 NMB 2009 03 27 18 01 00 4982-99 P n2o CCGG 323.370 0.260 ... H6 2009 05 13 14 38 00 -23.5800 15.0300 461.00 456.00 5.00 275184 NMB 2009 04 02 15 35 00 4737-99 P n2o CCGG 324.380 0.260 .X. H6 2009 05 13 13 52 00 -23.5800 15.0300 461.00 456.00 5.00 275181 NMB 2009 04 02 15 35 00 4738-99 P n2o CCGG 324.930 0.260 .X. H6 2009 05 13 14 07 00 -23.5800 15.0300 461.00 456.00 5.00 275182 NMB 2009 04 08 16 42 00 725-99 P n2o CCGG 322.880 0.260 ... H6 2009 05 13 13 21 00 -23.5800 15.0300 461.00 456.00 5.00 275179 NMB 2009 04 08 16 42 00 726-99 P n2o CCGG 322.930 0.260 ... H6 2009 05 13 13 37 00 -23.5800 15.0300 461.00 456.00 5.00 275180 NMB 2009 04 16 15 55 00 2755-99 P n2o CCGG 322.870 0.260 ... H6 2009 05 13 10 47 00 -23.5800 15.0300 461.00 456.00 5.00 275177 NMB 2009 04 16 15 55 00 2756-99 P n2o CCGG 322.430 0.260 ... H6 2009 05 13 11 03 00 -23.5800 15.0300 461.00 456.00 5.00 275178 NMB 2009 04 22 16 30 00 2641-99 P n2o CCGG 321.960 0.260 ... H4 2009 05 12 14 49 00 -23.5800 15.0300 461.00 456.00 5.00 275175 NMB 2009 04 22 16 30 00 2642-99 P n2o CCGG 321.960 0.260 ... H4 2009 05 12 15 03 00 -23.5800 15.0300 461.00 456.00 5.00 275176 NMB 2009 04 28 14 45 00 2003-99 P n2o CCGG 322.190 0.260 ... H6 2009 06 24 11 51 00 -23.5800 15.0300 461.00 456.00 5.00 277298 NMB 2009 04 28 14 45 00 2004-99 P n2o CCGG 322.130 0.260 ... H6 2009 06 24 12 07 00 -23.5800 15.0300 461.00 456.00 5.00 277299 NMB 2009 05 07 16 00 00 977-99 P n2o CCGG 322.210 0.260 ... H6 2009 06 24 12 22 00 -23.5800 15.0300 461.00 456.00 5.00 277300 NMB 2009 05 07 16 00 00 978-99 P n2o CCGG 322.330 0.260 ... H6 2009 06 24 12 38 00 -23.5800 15.0300 461.00 456.00 5.00 277301 NMB 2009 05 14 15 55 00 611-99 P n2o CCGG 321.520 0.260 ... H6 2009 06 24 13 24 00 -23.5800 15.0300 461.00 456.00 5.00 277304 NMB 2009 05 14 15 55 00 612-99 P n2o CCGG 321.850 0.260 ... H6 2009 06 24 13 40 00 -23.5800 15.0300 461.00 456.00 5.00 277305 NMB 2009 05 20 16 30 00 3445-99 P n2o CCGG 322.550 0.260 ... H6 2009 06 24 12 53 00 -23.5800 15.0300 461.00 456.00 5.00 277302 NMB 2009 05 20 16 30 00 3446-99 P n2o CCGG 322.520 0.260 ... H6 2009 06 24 13 09 00 -23.5800 15.0300 461.00 456.00 5.00 277303 NMB 2009 05 27 16 30 00 3235-99 P n2o CCGG 322.010 0.260 ... H6 2009 07 17 14 46 00 -23.5800 15.0300 461.00 456.00 5.00 279005 NMB 2009 05 27 16 30 00 3236-99 P n2o CCGG 322.310 0.260 ... H6 2009 07 17 15 01 00 -23.5800 15.0300 461.00 456.00 5.00 279006 NMB 2009 06 07 15 09 00 1809-99 P n2o CCGG 322.110 0.260 ... H6 2009 07 17 12 12 00 -23.5800 15.0300 461.00 456.00 5.00 279003 NMB 2009 06 07 15 09 00 1810-99 P n2o CCGG 322.710 0.260 ... H6 2009 07 17 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 279004 NMB 2009 06 17 16 30 00 4557-99 P n2o CCGG 321.660 0.260 ... H6 2009 07 23 13 51 00 -23.5800 15.0300 461.00 456.00 5.00 279486 NMB 2009 06 17 16 30 00 4558-99 P n2o CCGG 321.400 0.260 ... H6 2009 07 23 14 07 00 -23.5800 15.0300 461.00 456.00 5.00 279487 NMB 2009 06 24 17 19 00 815-99 P n2o CCGG 321.010 0.260 ... H6 2009 07 23 13 21 00 -23.5800 15.0300 461.00 456.00 5.00 279488 NMB 2009 06 24 17 19 00 816-99 P n2o CCGG 321.550 0.260 ... H6 2009 07 23 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 279489 NMB 2009 07 08 15 50 00 1593-99 P n2o CCGG 321.560 0.260 ... H6 2009 08 10 15 05 00 -23.5800 15.0300 461.00 456.00 5.00 280881 NMB 2009 07 08 15 50 00 1594-99 P n2o CCGG 322.040 0.260 ... H6 2009 08 10 15 21 00 -23.5800 15.0300 461.00 456.00 5.00 280882 NMB 2009 07 17 10 50 00 4311-99 P n2o CCGG 321.730 0.260 ... H6 2009 08 10 14 35 00 -23.5800 15.0300 461.00 456.00 5.00 280879 NMB 2009 07 17 10 50 00 4312-99 P n2o CCGG 321.220 0.260 ... H6 2009 08 10 14 50 00 -23.5800 15.0300 461.00 456.00 5.00 280880 NMB 2009 07 21 16 19 00 3969-99 P n2o CCGG 321.920 0.260 ... H6 2009 08 10 14 04 00 -23.5800 15.0300 461.00 456.00 5.00 280877 NMB 2009 07 21 16 19 00 3970-99 P n2o CCGG 322.500 0.260 ... H6 2009 08 10 14 19 00 -23.5800 15.0300 461.00 456.00 5.00 280878 NMB 2009 07 27 07 41 00 3911-99 P n2o CCGG 321.390 0.260 ... H6 2009 08 10 13 33 00 -23.5800 15.0300 461.00 456.00 5.00 280875 NMB 2009 07 27 07 41 00 3912-99 P n2o CCGG 321.460 0.260 ... H6 2009 08 10 13 48 00 -23.5800 15.0300 461.00 456.00 5.00 280876 NMB 2009 08 06 15 44 00 2203-99 P n2o CCGG 321.880 0.260 ... H6 2009 09 18 16 24 00 -23.5800 15.0300 461.00 456.00 5.00 283456 NMB 2009 08 06 15 44 00 2204-99 P n2o CCGG 321.860 0.260 ... H6 2009 09 18 16 40 00 -23.5800 15.0300 461.00 456.00 5.00 283457 NMB 2009 08 13 15 46 00 2979-99 P n2o CCGG 322.310 0.260 ... H6 2009 09 18 15 53 00 -23.5800 15.0300 461.00 456.00 5.00 283454 NMB 2009 08 13 15 46 00 2980-99 P n2o CCGG 322.440 0.260 ... H6 2009 09 18 16 09 00 -23.5800 15.0300 461.00 456.00 5.00 283455 NMB 2009 08 19 15 27 00 2541-99 P n2o CCGG 321.370 0.260 ... H6 2009 09 21 10 38 00 -23.5800 15.0300 461.00 456.00 5.00 283448 NMB 2009 08 19 15 27 00 2542-99 P n2o CCGG 321.750 0.260 ... H6 2009 09 21 10 53 00 -23.5800 15.0300 461.00 456.00 5.00 283449 NMB 2009 08 26 15 24 00 1159-99 P n2o CCGG 323.000 0.260 ... H4 2009 09 21 13 24 00 -23.5800 15.0300 461.00 456.00 5.00 283446 NMB 2009 08 26 15 24 00 1160-99 P n2o CCGG 324.090 0.260 ... H4 2009 09 21 13 39 00 -23.5800 15.0300 461.00 456.00 5.00 283447 NMB 2009 09 02 15 34 00 3215-99 P n2o CCGG 321.600 0.260 ... H6 2009 10 01 13 22 00 -23.5800 15.0300 461.00 456.00 5.00 284303 NMB 2009 09 02 15 34 00 3216-99 P n2o CCGG 321.910 0.260 ... H6 2009 10 01 13 37 00 -23.5800 15.0300 461.00 456.00 5.00 284304 NMB 2009 09 09 15 43 00 1405-99 P n2o CCGG 321.940 0.260 ... H6 2009 10 01 12 51 00 -23.5800 15.0300 461.00 456.00 5.00 284301 NMB 2009 09 09 15 43 00 1406-99 P n2o CCGG 321.990 0.260 ... H6 2009 10 01 13 06 00 -23.5800 15.0300 461.00 456.00 5.00 284302 NMB 2009 09 16 15 44 00 3835-99 P n2o CCGG 322.200 0.260 ... H6 2009 10 07 11 06 00 -23.5800 15.0300 461.00 456.00 5.00 284551 NMB 2009 09 16 15 44 00 3836-99 P n2o CCGG 322.140 0.260 ... H6 2009 10 07 11 22 00 -23.5800 15.0300 461.00 456.00 5.00 284552 NMB 2009 09 23 15 47 00 2363-99 P n2o CCGG 322.680 0.260 ... H6 2009 10 07 11 37 00 -23.5800 15.0300 461.00 456.00 5.00 284553 NMB 2009 09 23 15 47 00 2364-99 P n2o CCGG 322.930 0.260 ... H6 2009 10 07 11 53 00 -23.5800 15.0300 461.00 456.00 5.00 284554 NMB 2009 10 02 15 26 00 2317-99 P n2o CCGG 322.500 0.260 ... H6 2009 10 23 14 20 00 -23.5800 15.0300 461.00 456.00 5.00 285396 NMB 2009 10 02 15 26 00 2318-99 P n2o CCGG 322.480 0.260 ... H6 2009 10 23 14 36 00 -23.5800 15.0300 461.00 456.00 5.00 285397 NMB 2009 10 07 15 28 00 1433-99 P n2o CCGG 321.830 0.260 ... H6 2009 10 21 14 57 00 -23.5800 15.0300 461.00 456.00 5.00 285390 NMB 2009 10 07 15 28 00 1434-99 P n2o CCGG 322.130 0.260 ... H6 2009 10 21 15 13 00 -23.5800 15.0300 461.00 456.00 5.00 285391 NMB 2009 10 14 15 35 00 2911-99 P n2o CCGG 322.220 0.260 ... H6 2009 11 17 12 09 00 -23.5800 15.0300 461.00 456.00 5.00 285973 NMB 2009 10 14 15 35 00 2912-99 P n2o CCGG 322.090 0.260 ... H6 2009 11 17 12 25 00 -23.5800 15.0300 461.00 456.00 5.00 285974 NMB 2009 10 21 15 40 00 1823-99 P n2o CCGG 322.870 0.260 ... H6 2009 11 17 11 38 00 -23.5800 15.0300 461.00 456.00 5.00 285971 NMB 2009 10 21 15 40 00 1824-99 P n2o CCGG 322.810 0.260 ... H6 2009 11 17 11 54 00 -23.5800 15.0300 461.00 456.00 5.00 285972 NMB 2009 10 28 15 33 00 1643-99 P n2o CCGG 322.550 0.260 ... H6 2009 12 01 16 00 00 -23.5800 15.0300 461.00 456.00 5.00 286832 NMB 2009 10 28 15 33 00 1644-99 P n2o CCGG 322.910 0.260 ... H6 2009 12 01 16 15 00 -23.5800 15.0300 461.00 456.00 5.00 286833 NMB 2009 11 04 15 35 00 1179-99 P n2o CCGG 322.340 0.260 ... H6 2009 12 01 12 12 00 -23.5800 15.0300 461.00 456.00 5.00 286830 NMB 2009 11 04 15 35 00 1180-99 P n2o CCGG 322.370 0.260 ... H6 2009 12 01 12 28 00 -23.5800 15.0300 461.00 456.00 5.00 286831 NMB 2009 11 11 16 20 00 4637-99 P n2o CCGG 322.080 0.260 ... H6 2009 12 10 12 48 00 -23.5800 15.0300 461.00 456.00 5.00 287554 NMB 2009 11 11 16 20 00 4638-99 P n2o CCGG 321.920 0.260 ... H6 2009 12 10 13 04 00 -23.5800 15.0300 461.00 456.00 5.00 287555 NMB 2009 11 18 18 10 00 337-99 P n2o CCGG 323.250 0.260 ... H6 2009 12 10 12 18 00 -23.5800 15.0300 461.00 456.00 5.00 287552 NMB 2009 11 18 18 10 00 338-99 P n2o CCGG 322.580 0.260 ... H6 2009 12 10 12 33 00 -23.5800 15.0300 461.00 456.00 5.00 287553 NMB 2009 11 24 16 34 00 1223-91 P n2o CCGG 322.390 0.260 ... H6 2010 01 11 12 23 00 -23.5800 15.0300 461.00 456.00 5.00 288355 NMB 2009 11 24 16 34 00 1791-91 P n2o CCGG 321.270 0.260 ... H6 2010 01 11 12 08 00 -23.5800 15.0300 461.00 456.00 5.00 288354 NMB 2009 12 02 16 30 00 1305-99 P n2o CCGG 322.130 0.260 ... H6 2010 01 11 12 39 00 -23.5800 15.0300 461.00 456.00 5.00 288352 NMB 2009 12 02 16 30 00 1306-99 P n2o CCGG 322.220 0.260 ... H6 2010 01 11 12 54 00 -23.5800 15.0300 461.00 456.00 5.00 288353 NMB 2009 12 09 15 45 00 611-99 P n2o CCGG 322.080 0.260 ... H6 2010 01 22 13 12 00 -23.5800 15.0300 461.00 456.00 5.00 288932 NMB 2009 12 09 15 45 00 612-99 P n2o CCGG 321.630 0.260 ... H6 2010 01 22 13 27 00 -23.5800 15.0300 461.00 456.00 5.00 288933 NMB 2009 12 16 16 45 00 89-99 P n2o CCGG 322.390 0.260 ... H6 2010 01 22 12 41 00 -23.5800 15.0300 461.00 456.00 5.00 288934 NMB 2009 12 16 16 45 00 90-99 P n2o CCGG 322.490 0.260 ... H6 2010 01 22 12 56 00 -23.5800 15.0300 461.00 456.00 5.00 288935 NMB 2009 12 24 14 50 00 4155-99 P n2o CCGG 322.300 0.260 ... H6 2010 02 05 10 34 00 -23.5800 15.0300 461.00 456.00 5.00 289411 NMB 2009 12 24 14 50 00 4156-99 P n2o CCGG 322.820 0.260 ... H6 2010 02 05 10 49 00 -23.5800 15.0300 461.00 456.00 5.00 289412 NMB 2009 12 30 15 10 00 3611-99 P n2o CCGG 322.630 0.260 ... H6 2010 02 05 10 04 00 -23.5800 15.0300 461.00 456.00 5.00 289409 NMB 2009 12 30 15 10 00 3612-99 P n2o CCGG 322.530 0.260 ... H6 2010 02 05 10 19 00 -23.5800 15.0300 461.00 456.00 5.00 289410 NMB 2010 01 06 18 55 00 3247-99 P n2o CCGG 322.800 0.260 ... H6 2010 03 04 16 04 00 -23.5800 15.0300 461.00 456.00 5.00 291016 NMB 2010 01 06 18 55 00 3248-99 P n2o CCGG 322.230 0.260 ... H6 2010 03 04 16 19 00 -23.5800 15.0300 461.00 456.00 5.00 291017 NMB 2010 01 13 18 05 00 3905-99 P n2o CCGG 322.680 0.260 ... H6 2010 03 04 15 33 00 -23.5800 15.0300 461.00 456.00 5.00 291014 NMB 2010 01 13 18 05 00 3906-99 P n2o CCGG 322.770 0.260 ... H6 2010 03 04 15 49 00 -23.5800 15.0300 461.00 456.00 5.00 291015 NMB 2010 01 26 15 11 00 3953-99 P n2o CCGG 322.940 0.260 ... H6 2010 03 04 17 05 00 -23.5800 15.0300 461.00 456.00 5.00 291020 NMB 2010 01 26 15 11 00 3954-99 P n2o CCGG 322.750 0.260 ... H6 2010 03 04 17 20 00 -23.5800 15.0300 461.00 456.00 5.00 291021 NMB 2010 02 03 16 50 00 981-99 P n2o CCGG 322.410 0.260 ... H6 2010 03 04 16 35 00 -23.5800 15.0300 461.00 456.00 5.00 291018 NMB 2010 02 03 16 50 00 982-99 P n2o CCGG 322.310 0.260 ... H6 2010 03 04 16 50 00 -23.5800 15.0300 461.00 456.00 5.00 291019 NMB 2010 02 10 16 25 00 199-99 P n2o CCGG 323.240 0.260 ... H6 2010 03 25 10 17 00 -23.5800 15.0300 461.00 456.00 5.00 292283 NMB 2010 02 10 16 25 00 200-99 P n2o CCGG 322.860 0.260 ... H6 2010 03 25 10 32 00 -23.5800 15.0300 461.00 456.00 5.00 292284 NMB 2010 02 17 16 48 00 5039-99 P n2o CCGG 322.730 0.260 ... H6 2010 03 25 10 47 00 -23.5800 15.0300 461.00 456.00 5.00 292281 NMB 2010 02 17 16 48 00 5040-99 P n2o CCGG 322.650 0.260 ... H6 2010 03 25 11 03 00 -23.5800 15.0300 461.00 456.00 5.00 292282 NMB 2010 02 24 16 50 00 4631-99 P n2o CCGG 322.730 0.260 ... H6 2010 04 02 16 10 00 -23.5800 15.0300 461.00 456.00 5.00 292903 NMB 2010 02 24 16 50 00 4632-99 P n2o CCGG 322.520 0.260 ... H6 2010 04 02 16 25 00 -23.5800 15.0300 461.00 456.00 5.00 292904 NMB 2010 03 03 17 20 00 2643-99 P n2o CCGG 322.840 0.260 ... H6 2010 04 02 15 39 00 -23.5800 15.0300 461.00 456.00 5.00 292901 NMB 2010 03 03 17 20 00 2644-99 P n2o CCGG 322.510 0.260 ... H6 2010 04 02 15 55 00 -23.5800 15.0300 461.00 456.00 5.00 292902 NMB 2010 03 18 16 40 00 2149-99 P n2o CCGG 322.640 0.260 ... H6 2010 04 12 17 05 00 -23.5800 15.0300 461.00 456.00 5.00 293709 NMB 2010 03 18 16 40 00 4650-99 P n2o CCGG 322.540 0.260 ... H6 2010 04 12 17 20 00 -23.5800 15.0300 461.00 456.00 5.00 293710 NMB 2010 03 24 17 30 00 2150-99 P n2o CCGG 322.800 0.260 ... H6 2010 04 12 16 35 00 -23.5800 15.0300 461.00 456.00 5.00 293711 NMB 2010 03 24 17 30 00 4649-99 P n2o CCGG 322.570 0.260 ... H6 2010 04 12 16 50 00 -23.5800 15.0300 461.00 456.00 5.00 293712 NMB 2010 04 08 17 00 00 3501-99 P n2o CCGG 326.300 0.260 .X. H6 2010 05 14 14 36 00 -23.5800 15.0300 461.00 456.00 5.00 295701 NMB 2010 04 08 17 00 00 3502-99 P n2o CCGG 326.320 0.260 .X. H6 2010 05 14 14 52 00 -23.5800 15.0300 461.00 456.00 5.00 295702 NMB 2010 04 12 16 15 00 2017-99 P n2o CCGG 323.760 0.260 ... H6 2010 05 14 14 06 00 -23.5800 15.0300 461.00 456.00 5.00 295703 NMB 2010 04 12 16 15 00 2018-99 P n2o CCGG 323.600 0.260 ... H6 2010 05 14 14 21 00 -23.5800 15.0300 461.00 456.00 5.00 295704 NMB 2010 04 22 16 00 00 3095-99 P n2o CCGG 323.430 0.260 ... H4 2010 05 25 13 29 00 -23.5800 15.0300 461.00 456.00 5.00 296715 NMB 2010 04 22 16 00 00 3096-99 P n2o CCGG 323.220 0.260 ... H4 2010 05 25 13 43 00 -23.5800 15.0300 461.00 456.00 5.00 296716 NMB 2010 04 29 17 05 00 4049-99 P n2o CCGG 323.420 0.260 ... H4 2010 05 25 13 58 00 -23.5800 15.0300 461.00 456.00 5.00 296713 NMB 2010 04 29 17 05 00 4050-99 P n2o CCGG 323.600 0.260 ... H4 2010 05 25 14 13 00 -23.5800 15.0300 461.00 456.00 5.00 296714 NMB 2010 05 05 17 05 00 419-99 P n2o CCGG 323.030 0.260 ... H6 2010 05 27 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 297149 NMB 2010 05 05 17 05 00 420-99 P n2o CCGG 323.170 0.260 ... H6 2010 05 27 13 52 00 -23.5800 15.0300 461.00 456.00 5.00 297150 NMB 2010 05 12 17 25 00 711-99 P n2o CCGG 322.260 0.260 ... H4 2010 05 27 13 55 00 -23.5800 15.0300 461.00 456.00 5.00 297147 NMB 2010 05 12 17 25 00 712-99 P n2o CCGG 322.070 0.260 ... H4 2010 05 27 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 297148 NMB 2010 05 19 16 30 00 2219-99 P n2o CCGG 321.090 0.260 A.. H6 2010 07 02 12 54 00 -23.5800 15.0300 461.00 456.00 5.00 299444 NMB 2010 05 19 16 30 00 2220-99 P n2o CCGG 322.940 0.260 ... H6 2010 07 02 13 09 00 -23.5800 15.0300 461.00 456.00 5.00 299445 NMB 2010 06 02 16 45 00 2241-99 P n2o CCGG 322.870 0.260 ... H6 2010 07 02 12 16 00 -23.5800 15.0300 461.00 456.00 5.00 299442 NMB 2010 06 02 16 45 00 2242-99 P n2o CCGG 322.670 0.260 ... H6 2010 07 02 12 31 00 -23.5800 15.0300 461.00 456.00 5.00 299443 NMB 2010 06 09 16 34 00 3604-99 P n2o CCGG 324.770 0.260 N.. H6 2010 07 02 11 30 00 -23.5800 15.0300 461.00 456.00 5.00 299441 NMB 2010 06 09 16 34 00 4280-99 P n2o CCGG 322.570 0.260 N.. H6 2010 07 02 11 15 00 -23.5800 15.0300 461.00 456.00 5.00 299440 NMB 2010 06 16 16 30 00 3616-99 P n2o CCGG 321.930 0.260 ... H6 2010 07 02 12 01 00 -23.5800 15.0300 461.00 456.00 5.00 299439 NMB 2010 06 16 16 30 00 4219-99 P n2o CCGG 322.260 0.260 ... H6 2010 07 02 11 46 00 -23.5800 15.0300 461.00 456.00 5.00 299438 NMB 2010 06 23 17 00 00 4443-99 P n2o CCGG 322.500 0.260 ... H6 2010 07 12 15 02 00 -23.5800 15.0300 461.00 456.00 5.00 299893 NMB 2010 06 23 17 00 00 4444-99 P n2o CCGG 322.650 0.260 ... H6 2010 07 12 15 18 00 -23.5800 15.0300 461.00 456.00 5.00 299894 NMB 2010 07 01 15 40 00 1475-99 P n2o CCGG 322.970 0.260 ... H6 2010 07 12 14 32 00 -23.5800 15.0300 461.00 456.00 5.00 299891 NMB 2010 07 01 15 40 00 1476-99 P n2o CCGG 323.040 0.260 ... H6 2010 07 12 14 47 00 -23.5800 15.0300 461.00 456.00 5.00 299892 NMB 2010 07 08 16 50 00 2137-99 P n2o CCGG 322.870 0.260 ... H6 2010 07 27 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 300878 NMB 2010 07 08 16 50 00 2138-99 P n2o CCGG 323.100 0.260 ... H6 2010 07 27 12 42 00 -23.5800 15.0300 461.00 456.00 5.00 300879 NMB 2010 07 14 16 31 00 1821-99 P n2o CCGG 321.860 0.260 ... H6 2010 07 27 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 300876 NMB 2010 07 14 16 31 00 1822-99 P n2o CCGG 322.930 0.260 ... H6 2010 07 27 12 12 00 -23.5800 15.0300 461.00 456.00 5.00 300877 NMB 2010 07 22 16 30 00 517-99 P n2o CCGG 323.490 0.260 ... H6 2010 08 27 09 41 00 -23.5800 15.0300 461.00 456.00 5.00 302465 NMB 2010 07 22 16 30 00 518-99 P n2o CCGG 323.440 0.260 ... H6 2010 08 27 09 56 00 -23.5800 15.0300 461.00 456.00 5.00 302466 NMB 2010 07 28 16 50 00 4327-99 P n2o CCGG 323.470 0.260 ... H6 2010 08 27 10 42 00 -23.5800 15.0300 461.00 456.00 5.00 302463 NMB 2010 07 28 16 50 00 4328-99 P n2o CCGG 323.500 0.260 ... H6 2010 08 27 10 57 00 -23.5800 15.0300 461.00 456.00 5.00 302464 NMB 2010 08 05 15 30 00 3267-99 P n2o CCGG 323.200 0.260 ... H6 2010 08 24 11 20 00 -23.5800 15.0300 461.00 456.00 5.00 302429 NMB 2010 08 05 15 30 00 3268-99 P n2o CCGG 323.380 0.260 ... H6 2010 08 24 11 36 00 -23.5800 15.0300 461.00 456.00 5.00 302430 NMB 2010 08 12 16 00 00 3459-99 P n2o CCGG 322.400 0.260 ... H6 2010 08 24 12 52 00 -23.5800 15.0300 461.00 456.00 5.00 302428 NMB 2010 08 18 16 45 00 2197-99 P n2o CCGG 323.710 0.260 ... H6 2010 09 14 09 36 00 -23.5800 15.0300 461.00 456.00 5.00 303589 NMB 2010 08 18 16 45 00 2198-99 P n2o CCGG 323.400 0.260 ... H6 2010 09 14 09 51 00 -23.5800 15.0300 461.00 456.00 5.00 303590 NMB 2010 08 25 16 25 00 1319-99 P n2o CCGG 323.480 0.260 ... H6 2010 09 14 12 08 00 -23.5800 15.0300 461.00 456.00 5.00 303591 NMB 2010 08 25 16 25 00 1320-99 P n2o CCGG 323.440 0.260 ... H6 2010 09 14 12 24 00 -23.5800 15.0300 461.00 456.00 5.00 303592 NMB 2010 09 01 16 55 00 2707-99 P n2o CCGG 322.820 0.260 ... H6 2010 10 06 12 50 00 -23.5800 15.0300 461.00 456.00 5.00 304960 NMB 2010 09 01 16 55 00 2708-99 P n2o CCGG 322.280 0.260 ... H6 2010 10 06 13 05 00 -23.5800 15.0300 461.00 456.00 5.00 304961 NMB 2010 09 09 15 50 00 3443-99 P n2o CCGG 322.480 0.260 ... H6 2010 10 06 13 21 00 -23.5800 15.0300 461.00 456.00 5.00 304958 NMB 2010 09 09 15 50 00 3444-99 P n2o CCGG 323.350 0.260 ... H6 2010 10 06 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 304959 NMB 2010 09 18 16 45 00 2105-99 P n2o CCGG 323.060 0.260 ... H6 2010 10 07 12 25 00 -23.5800 15.0300 461.00 456.00 5.00 305118 NMB 2010 09 18 16 45 00 2106-99 P n2o CCGG 323.290 0.260 ... H6 2010 10 07 12 40 00 -23.5800 15.0300 461.00 456.00 5.00 305119 NMB 2010 09 23 16 15 00 1913-99 P n2o CCGG 323.070 0.260 ... H6 2010 10 07 11 54 00 -23.5800 15.0300 461.00 456.00 5.00 305116 NMB 2010 09 23 16 15 00 1914-99 P n2o CCGG 323.010 0.260 ... H6 2010 10 07 12 09 00 -23.5800 15.0300 461.00 456.00 5.00 305117 NMB 2010 09 29 16 00 00 3965-99 P n2o CCGG 324.060 0.260 ... H6 2010 11 05 10 02 00 -23.5800 15.0300 461.00 456.00 5.00 306905 NMB 2010 09 29 16 00 00 3966-99 P n2o CCGG 324.280 0.260 ... H6 2010 11 05 10 17 00 -23.5800 15.0300 461.00 456.00 5.00 306906 NMB 2010 10 02 16 56 00 717-99 P n2o CCGG 323.120 0.260 ... H6 2010 11 05 09 31 00 -23.5800 15.0300 461.00 456.00 5.00 306907 NMB 2010 10 02 16 56 00 718-99 P n2o CCGG 323.150 0.260 ... H6 2010 11 05 09 46 00 -23.5800 15.0300 461.00 456.00 5.00 306908 NMB 2010 10 15 13 24 00 2934-99 P n2o CCGG 322.700 0.260 ... H6 2010 11 05 11 18 00 -23.5800 15.0300 461.00 456.00 5.00 306911 NMB 2010 10 15 13 24 00 4082-99 P n2o CCGG 322.560 0.260 ... H6 2010 11 05 11 03 00 -23.5800 15.0300 461.00 456.00 5.00 306912 NMB 2010 10 20 16 15 00 1315-99 P n2o CCGG 323.110 0.260 ... H6 2010 11 05 10 32 00 -23.5800 15.0300 461.00 456.00 5.00 306909 NMB 2010 10 20 16 15 00 772-99 P n2o CCGG 323.130 0.260 ... H6 2010 11 05 10 47 00 -23.5800 15.0300 461.00 456.00 5.00 306910 NMB 2010 10 27 16 00 00 4529-99 P n2o CCGG 322.350 0.260 ... H6 2010 12 08 13 10 00 -23.5800 15.0300 461.00 456.00 5.00 308545 NMB 2010 11 05 09 00 00 2073-99 P n2o CCGG 321.680 0.260 A.. H6 2010 12 08 10 51 00 -23.5800 15.0300 461.00 456.00 5.00 308543 NMB 2010 11 05 09 00 00 2074-99 P n2o CCGG 322.940 0.260 ... H6 2010 12 08 11 06 00 -23.5800 15.0300 461.00 456.00 5.00 308544 NMB 2010 11 26 09 30 00 1363-99 P n2o CCGG 323.340 0.260 ... H4 2011 11 04 12 49 00 -23.5800 15.0300 461.00 456.00 5.00 326030 NMB 2010 11 26 09 30 00 3524-99 P n2o CCGG 323.260 0.260 ... H4 2011 11 04 13 05 00 -23.5800 15.0300 461.00 456.00 5.00 326031 NMB 2010 12 02 16 50 00 112-99 P n2o CCGG 323.550 0.260 ... H4 2011 11 04 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 326033 NMB 2010 12 02 16 50 00 4307-99 P n2o CCGG 323.190 0.260 ... H4 2011 11 04 12 19 00 -23.5800 15.0300 461.00 456.00 5.00 326032 NMB 2010 12 09 16 38 00 4359-99 P n2o CCGG 323.610 0.260 ... H6 2011 02 02 16 57 00 -23.5800 15.0300 461.00 456.00 5.00 311883 NMB 2010 12 09 16 38 00 4360-99 P n2o CCGG 323.570 0.260 ... H6 2011 02 02 17 14 00 -23.5800 15.0300 461.00 456.00 5.00 311884 NMB 2010 12 15 17 09 00 2751-99 P n2o CCGG 323.290 0.260 ... H6 2011 02 02 16 25 00 -23.5800 15.0300 461.00 456.00 5.00 311881 NMB 2010 12 15 17 09 00 2752-99 P n2o CCGG 323.360 0.260 ... H6 2011 02 02 16 41 00 -23.5800 15.0300 461.00 456.00 5.00 311882 NMB 2010 12 20 16 00 00 3154-99 P n2o CCGG 323.720 0.260 ... H6 2011 02 01 12 50 00 -23.5800 15.0300 461.00 456.00 5.00 311821 NMB 2010 12 20 16 00 00 502-99 P n2o CCGG 323.310 0.260 ... H6 2011 02 01 13 06 00 -23.5800 15.0300 461.00 456.00 5.00 311822 NMB 2011 01 10 16 30 00 4184-99 P n2o CCGG 324.180 0.260 ... H6 2011 02 11 16 32 00 -23.5800 15.0300 461.00 456.00 5.00 311823 NMB 2011 01 14 15 49 00 1069-99 P n2o CCGG 324.730 0.260 ... H6 2011 02 22 17 04 00 -23.5800 15.0300 461.00 456.00 5.00 313064 NMB 2011 01 14 15 49 00 4740-99 P n2o CCGG 324.580 0.260 ... H6 2011 02 22 17 20 00 -23.5800 15.0300 461.00 456.00 5.00 313065 NMB 2011 01 20 14 50 00 3549-99 P n2o CCGG 323.830 0.260 ... H6 2011 02 22 17 36 00 -23.5800 15.0300 461.00 456.00 5.00 313062 NMB 2011 01 20 14 50 00 3624-99 P n2o CCGG 323.980 0.260 ... H6 2011 02 22 17 53 00 -23.5800 15.0300 461.00 456.00 5.00 313063 NMB 2011 08 19 08 46 00 4190-99 P n2o CCGG 324.860 0.260 ... H4 2011 09 26 16 12 00 -23.5800 15.0300 461.00 456.00 5.00 324202 NMB 2011 08 19 08 46 00 4619-99 P n2o CCGG 324.550 0.260 ... H4 2011 09 26 15 57 00 -23.5800 15.0300 461.00 456.00 5.00 324201 NMB 2011 08 24 15 30 00 2175-99 P n2o CCGG 323.930 0.260 ... H4 2011 09 26 16 27 00 -23.5800 15.0300 461.00 456.00 5.00 324203 NMB 2011 08 24 15 30 00 240-99 P n2o CCGG 323.650 0.260 ... H4 2011 09 26 16 43 00 -23.5800 15.0300 461.00 456.00 5.00 324204 NMB 2011 09 02 16 15 00 1476-99 P n2o CCGG 324.180 0.260 ... H4 2011 09 27 12 58 00 -23.5800 15.0300 461.00 456.00 5.00 324192 NMB 2011 09 02 16 15 00 2384-99 P n2o CCGG 324.270 0.260 ... H4 2011 09 27 12 43 00 -23.5800 15.0300 461.00 456.00 5.00 324191 NMB 2011 09 09 12 34 56 2083-99 P n2o CCGG 324.850 0.260 ... H4 2011 09 27 12 28 00 -23.5800 15.0300 461.00 456.00 5.00 324190 NMB 2011 09 09 12 34 56 2211-99 P n2o CCGG 324.770 0.260 ... H4 2011 09 27 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 324189 NMB 2011 09 14 09 45 00 1302-99 P n2o CCGG 324.020 0.260 ... H4 2011 09 27 11 42 00 -23.5800 15.0300 461.00 456.00 5.00 324187 NMB 2011 09 14 09 45 00 1305-99 P n2o CCGG 324.670 0.260 ... H4 2011 09 27 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 324188 NMB 2011 09 23 14 53 00 3296-99 P n2o CCGG 324.030 0.260 ... H4 2011 11 04 14 06 00 -23.5800 15.0300 461.00 456.00 5.00 326049 NMB 2011 09 23 14 53 00 4726-99 P n2o CCGG 324.090 0.260 ... H4 2011 11 04 13 50 00 -23.5800 15.0300 461.00 456.00 5.00 326048 NMB 2011 09 30 13 19 00 2414-99 P n2o CCGG 324.760 0.260 ... H4 2011 11 04 13 35 00 -23.5800 15.0300 461.00 456.00 5.00 326047 NMB 2011 09 30 13 19 00 4841-99 P n2o CCGG 324.890 0.260 ... H4 2011 11 04 13 20 00 -23.5800 15.0300 461.00 456.00 5.00 326046 NMB 2011 10 07 15 53 00 3008-99 P n2o CCGG 324.250 0.260 ... H4 2011 11 04 11 18 00 -23.5800 15.0300 461.00 456.00 5.00 326026 NMB 2011 10 07 15 53 00 3489-99 P n2o CCGG 324.330 0.260 ... H4 2011 11 04 11 33 00 -23.5800 15.0300 461.00 456.00 5.00 326027 NMB 2011 10 14 16 30 00 1766-99 P n2o CCGG 324.170 0.260 ... H4 2011 11 04 11 48 00 -23.5800 15.0300 461.00 456.00 5.00 326028 NMB 2011 10 14 16 30 00 2567-99 P n2o CCGG 324.080 0.260 ... H4 2011 11 04 12 04 00 -23.5800 15.0300 461.00 456.00 5.00 326029 NMB 2011 10 22 15 28 00 1233-99 P n2o CCGG 324.600 0.260 ... H4 2011 12 07 13 45 00 -23.5800 15.0300 461.00 456.00 5.00 327315 NMB 2011 11 03 17 00 00 2845-99 P n2o CCGG 324.850 0.260 ... H4 2012 02 16 10 03 00 -23.5800 15.0300 461.00 456.00 5.00 331429 NMB 2011 11 03 17 00 00 5060-99 P n2o CCGG 325.220 0.260 ... H4 2012 02 16 10 18 00 -23.5800 15.0300 461.00 456.00 5.00 331430 NMB 2011 11 11 15 07 00 1153-99 P n2o CCGG 323.770 0.260 ... H4 2011 12 07 13 30 00 -23.5800 15.0300 461.00 456.00 5.00 327314 NMB 2011 11 11 15 07 00 2691-99 P n2o CCGG 324.150 0.260 ... H4 2011 12 07 13 15 00 -23.5800 15.0300 461.00 456.00 5.00 327313 NMB 2011 11 18 18 16 00 289-99 P n2o CCGG 324.460 0.260 ... H6 2011 12 29 15 48 00 -23.5800 15.0300 461.00 456.00 5.00 328323 NMB 2011 11 18 18 16 00 4589-99 P n2o CCGG 324.460 0.260 ... H6 2011 12 29 15 32 00 -23.5800 15.0300 461.00 456.00 5.00 328324 NMB 2011 11 23 16 40 00 2568-99 P n2o CCGG 324.460 0.260 ... H6 2011 12 29 16 04 00 -23.5800 15.0300 461.00 456.00 5.00 328325 NMB 2011 11 23 16 40 00 4223-99 P n2o CCGG 324.620 0.260 ... H6 2011 12 29 16 21 00 -23.5800 15.0300 461.00 456.00 5.00 328326 NMB 2011 12 02 16 45 00 673-99 P n2o CCGG 324.660 0.260 ... H6 2012 01 04 10 30 00 -23.5800 15.0300 461.00 456.00 5.00 328320 NMB 2011 12 06 16 44 00 4430-99 P n2o CCGG 324.890 0.260 ... H6 2011 12 29 15 16 00 -23.5800 15.0300 461.00 456.00 5.00 328322 NMB 2011 12 06 16 44 00 54-99 P n2o CCGG 325.460 0.260 ... H6 2011 12 29 14 59 00 -23.5800 15.0300 461.00 456.00 5.00 328321 NMB 2011 12 16 16 00 00 3652-99 P n2o CCGG 324.260 0.260 ... H4 2012 01 24 14 00 00 -23.5800 15.0300 461.00 456.00 5.00 329659 NMB 2011 12 16 16 00 00 4509-99 P n2o CCGG 324.280 0.260 ... H4 2012 01 24 13 45 00 -23.5800 15.0300 461.00 456.00 5.00 329658 NMB 2011 12 22 15 50 00 2100-99 P n2o CCGG 323.940 0.260 ... H4 2012 01 24 14 30 00 -23.5800 15.0300 461.00 456.00 5.00 329661 NMB 2011 12 22 15 50 00 3320-99 P n2o CCGG 324.050 0.260 ... H4 2012 01 24 14 15 00 -23.5800 15.0300 461.00 456.00 5.00 329660 NMB 2012 01 01 17 20 00 3812-99 P n2o CCGG 325.200 0.260 ... H4 2012 01 24 13 14 00 -23.5800 15.0300 461.00 456.00 5.00 329654 NMB 2012 01 01 17 20 00 4371-99 P n2o CCGG 324.740 0.260 ... H4 2012 01 24 13 29 00 -23.5800 15.0300 461.00 456.00 5.00 329655 NMB 2012 01 06 17 34 00 1274-99 P n2o CCGG 325.470 0.260 ... H4 2012 01 24 12 58 00 -23.5800 15.0300 461.00 456.00 5.00 329657 NMB 2012 01 06 17 34 00 4143-99 P n2o CCGG 325.650 0.260 ... H4 2012 01 24 12 43 00 -23.5800 15.0300 461.00 456.00 5.00 329656 NMB 2012 01 15 17 35 00 4220-99 P n2o CCGG 324.330 0.260 ... H4 2012 02 17 13 35 00 -23.5800 15.0300 461.00 456.00 5.00 331427 NMB 2012 01 15 17 35 00 4754-99 P n2o CCGG 324.710 0.260 ... H4 2012 02 17 13 50 00 -23.5800 15.0300 461.00 456.00 5.00 331428 NMB 2012 01 20 13 53 00 4958-99 P n2o CCGG 324.310 0.260 ... H4 2012 02 17 13 19 00 -23.5800 15.0300 461.00 456.00 5.00 331425 NMB 2012 01 20 13 53 00 5280-99 P n2o CCGG 324.540 0.260 ... H4 2012 02 17 13 04 00 -23.5800 15.0300 461.00 456.00 5.00 331426 NMB 2012 01 27 16 40 00 2606-99 P n2o CCGG 324.080 0.260 ... H4 2012 02 16 10 48 00 -23.5800 15.0300 461.00 456.00 5.00 331432 NMB 2012 01 27 16 40 00 4830-99 P n2o CCGG 324.150 0.260 ... H4 2012 02 16 10 33 00 -23.5800 15.0300 461.00 456.00 5.00 331431 NMB 2012 02 10 16 45 00 1069-99 P n2o CCGG 324.840 0.260 ... H4 2012 03 13 09 34 00 -23.5800 15.0300 461.00 456.00 5.00 332374 NMB 2012 02 10 16 45 00 2395-99 P n2o CCGG 324.630 0.260 ... H4 2012 03 13 09 49 00 -23.5800 15.0300 461.00 456.00 5.00 332375 NMB 2012 02 17 17 42 00 1347-99 P n2o CCGG 324.080 0.260 ... H4 2012 03 13 10 20 00 -23.5800 15.0300 461.00 456.00 5.00 332373 NMB 2012 02 17 17 42 00 3967-99 P n2o CCGG 324.170 0.260 ... H4 2012 03 13 10 05 00 -23.5800 15.0300 461.00 456.00 5.00 332372 NMB 2012 02 23 17 03 00 2276-99 P n2o CCGG 324.530 0.260 ... H4 2012 03 21 14 12 00 -23.5800 15.0300 461.00 456.00 5.00 332860 NMB 2012 02 23 17 03 00 4528-99 P n2o CCGG 325.000 0.260 ... H4 2012 03 21 14 27 00 -23.5800 15.0300 461.00 456.00 5.00 332861 NMB 2012 03 04 17 00 00 1493-99 P n2o CCGG 324.220 0.260 ... H4 2012 03 21 15 13 00 -23.5800 15.0300 461.00 456.00 5.00 332858 NMB 2012 03 04 17 00 00 2431-99 P n2o CCGG 324.900 0.260 ... H4 2012 03 21 15 28 00 -23.5800 15.0300 461.00 456.00 5.00 332859 NMB 2012 03 11 17 31 00 1591-99 P n2o CCGG 324.750 0.260 ... H4 2012 04 11 14 13 00 -23.5800 15.0300 461.00 456.00 5.00 333896 NMB 2012 03 11 17 31 00 4404-99 P n2o CCGG 324.810 0.260 ... H4 2012 04 11 14 28 00 -23.5800 15.0300 461.00 456.00 5.00 333897 NMB 2012 03 16 16 44 00 5197-99 P n2o CCGG 325.250 0.260 ... H4 2012 04 13 13 19 00 -23.5800 15.0300 461.00 456.00 5.00 333905 NMB 2012 03 16 16 44 00 836-99 P n2o CCGG 325.260 0.260 ... H4 2012 04 13 13 34 00 -23.5800 15.0300 461.00 456.00 5.00 333904 NMB 2012 03 25 18 27 00 1220-99 P n2o CCGG 324.930 0.260 ... H4 2012 04 13 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 333903 NMB 2012 03 25 18 27 00 5219-99 P n2o CCGG 324.100 0.260 ... H4 2012 04 13 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 333902 NMB 2012 04 13 14 44 00 1247-99 P n2o CCGG 325.150 0.260 ... H4 2012 05 11 10 00 00 -23.5800 15.0300 461.00 456.00 5.00 334949 NMB 2012 04 13 14 44 00 1325-99 P n2o CCGG 325.330 0.260 ... H4 2012 05 11 09 44 00 -23.5800 15.0300 461.00 456.00 5.00 334948 NMB 2012 04 23 15 33 00 4045-99 P n2o CCGG 326.200 0.260 ... H6 2012 05 10 14 30 00 -23.5800 15.0300 461.00 456.00 5.00 334950 NMB 2012 04 23 15 33 00 4634-99 P n2o CCGG 326.490 0.260 ... H6 2012 05 10 14 14 00 -23.5800 15.0300 461.00 456.00 5.00 334951 NMB 2012 04 28 16 00 00 4211-99 P n2o CCGG 325.110 0.260 ... H6 2012 06 05 14 39 00 -23.5800 15.0300 461.00 456.00 5.00 336428 NMB 2012 04 28 16 00 00 4509-99 P n2o CCGG 325.110 0.260 ... H6 2012 06 05 14 23 00 -23.5800 15.0300 461.00 456.00 5.00 336427 NMB 2012 05 13 14 56 00 1081-99 P n2o CCGG 325.790 0.260 ... H6 2012 06 05 14 56 00 -23.5800 15.0300 461.00 456.00 5.00 336429 NMB 2012 05 13 14 56 00 3320-99 P n2o CCGG 325.630 0.260 ... H6 2012 06 05 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 336430 NMB 2012 05 18 15 00 00 1014-99 P n2o CCGG 326.180 0.260 ... H4 2012 06 19 14 26 00 -23.5800 15.0300 461.00 456.00 5.00 337022 NMB 2012 05 18 15 00 00 881-99 P n2o CCGG 325.930 0.260 ... H4 2012 06 19 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 337021 NMB 2012 05 31 14 58 00 3582-99 P n2o CCGG 325.570 0.260 ... H4 2012 06 19 13 55 00 -23.5800 15.0300 461.00 456.00 5.00 337024 NMB 2012 05 31 14 58 00 5311-99 P n2o CCGG 325.480 0.260 ... H4 2012 06 19 13 40 00 -23.5800 15.0300 461.00 456.00 5.00 337023 NMB 2012 06 08 14 30 00 4217-99 P n2o CCGG 324.260 0.260 ... H4 2012 08 09 11 27 00 -23.5800 15.0300 461.00 456.00 5.00 339192 NMB 2012 06 08 14 30 00 5283-99 P n2o CCGG 323.810 0.260 ... H4 2012 08 09 11 43 00 -23.5800 15.0300 461.00 456.00 5.00 339193 NMB 2012 06 22 15 01 00 2152-99 P n2o CCGG 325.650 0.260 ... H4 2012 08 09 11 12 00 -23.5800 15.0300 461.00 456.00 5.00 339191 NMB 2012 06 22 15 01 00 4135-99 P n2o CCGG 325.400 0.260 ... H4 2012 08 09 10 57 00 -23.5800 15.0300 461.00 456.00 5.00 339190 NMB 2012 07 13 14 40 00 1595-99 P n2o CCGG 325.310 0.260 ... H4 2012 08 28 14 06 00 -23.5800 15.0300 461.00 456.00 5.00 339945 NMB 2012 07 13 14 40 00 5285-99 P n2o CCGG 325.070 0.260 ... H4 2012 08 28 14 22 00 -23.5800 15.0300 461.00 456.00 5.00 339946 NMB 2012 07 20 14 46 00 2887-99 P n2o CCGG 325.210 0.260 ... H4 2012 08 28 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 339947 NMB 2012 07 20 14 46 00 734-99 P n2o CCGG 324.860 0.260 ... H4 2012 08 28 13 51 00 -23.5800 15.0300 461.00 456.00 5.00 339948 NMB 2012 07 29 14 24 00 1220-99 P n2o CCGG 325.890 0.260 ... H4 2012 08 28 12 04 00 -23.5800 15.0300 461.00 456.00 5.00 339913 NMB 2012 07 29 14 24 00 2268-99 P n2o CCGG 326.270 0.260 ... H4 2012 08 28 12 20 00 -23.5800 15.0300 461.00 456.00 5.00 339914 NMB 2012 08 03 14 17 00 2439-99 P n2o CCGG 325.730 0.260 ... H4 2012 08 28 11 49 00 -23.5800 15.0300 461.00 456.00 5.00 339928 NMB 2012 08 03 14 17 00 3651-99 P n2o CCGG 325.160 0.260 ... H4 2012 08 28 11 34 00 -23.5800 15.0300 461.00 456.00 5.00 339927 NMB 2012 08 19 14 35 00 1447-99 P n2o CCGG 324.680 0.260 ... H4 2012 09 27 16 32 00 -23.5800 15.0300 461.00 456.00 5.00 341447 NMB 2012 08 19 14 35 00 6414-66 P n2o CCGG 324.950 0.260 ... H4 2012 09 27 16 47 00 -23.5800 15.0300 461.00 456.00 5.00 341448 NMB 2012 08 22 14 30 00 1877-99 P n2o CCGG 324.630 0.260 ... H4 2012 09 27 16 01 00 -23.5800 15.0300 461.00 456.00 5.00 341443 NMB 2012 08 22 14 30 00 3277-99 P n2o CCGG 324.630 0.260 ... H4 2012 09 27 16 17 00 -23.5800 15.0300 461.00 456.00 5.00 341444 NMB 2012 08 29 14 02 00 1248-99 P n2o CCGG 324.980 0.260 ... H4 2012 09 27 15 31 00 -23.5800 15.0300 461.00 456.00 5.00 341445 NMB 2012 08 29 14 02 00 3369-99 P n2o CCGG 325.310 0.260 ... H4 2012 09 27 15 46 00 -23.5800 15.0300 461.00 456.00 5.00 341446 NMB 2012 09 05 15 58 00 1237-99 P n2o CCGG 324.900 0.260 ... H4 2012 11 07 09 28 00 -23.5800 15.0300 461.00 456.00 5.00 343164 NMB 2012 09 05 15 58 00 1760-99 P n2o CCGG 325.120 0.260 ... H4 2012 11 07 09 43 00 -23.5800 15.0300 461.00 456.00 5.00 343165 NMB 2012 09 15 16 00 00 1603-99 P n2o CCGG 325.810 0.260 ... H4 2012 11 07 08 57 00 -23.5800 15.0300 461.00 456.00 5.00 343166 NMB 2012 09 15 16 00 00 535-99 P n2o CCGG 325.780 0.260 ... H4 2012 11 07 09 12 00 -23.5800 15.0300 461.00 456.00 5.00 343167 NMB 2012 09 20 16 55 00 1337-99 P n2o CCGG 325.170 0.260 ... H4 2012 11 06 15 42 00 -23.5800 15.0300 461.00 456.00 5.00 343158 NMB 2012 09 20 16 55 00 2922-99 P n2o CCGG 325.330 0.260 ... H4 2012 11 06 15 27 00 -23.5800 15.0300 461.00 456.00 5.00 343157 NMB 2012 09 30 16 27 00 1070-99 P n2o CCGG 325.230 0.260 ... H4 2012 11 06 14 57 00 -23.5800 15.0300 461.00 456.00 5.00 343159 NMB 2012 09 30 16 27 00 871-99 P n2o CCGG 324.810 0.260 ... H4 2012 11 06 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 343160 NMB 2012 10 07 16 05 00 3978-99 P n2o CCGG 325.720 0.260 ... H4 2012 11 06 15 58 00 -23.5800 15.0300 461.00 456.00 5.00 343161 NMB 2012 10 07 16 05 00 6501-66 P n2o CCGG 324.970 0.260 ... H4 2012 11 06 16 13 00 -23.5800 15.0300 461.00 456.00 5.00 343162 NMB 2012 10 11 18 32 00 2921-99 P n2o CCGG 325.140 0.260 ... H4 2012 11 27 13 38 00 -23.5800 15.0300 461.00 456.00 5.00 343163 NMB 2012 10 18 15 30 00 3990-99 P n2o CCGG 324.990 0.260 ... H4 2012 12 04 10 32 00 -23.5800 15.0300 461.00 456.00 5.00 344359 NMB 2012 10 18 15 30 00 770-99 P n2o CCGG 325.010 0.260 ... H4 2012 12 04 10 47 00 -23.5800 15.0300 461.00 456.00 5.00 344360 NMB 2012 10 27 15 34 00 3335-99 P n2o CCGG 325.050 0.260 ... H4 2012 12 03 14 36 00 -23.5800 15.0300 461.00 456.00 5.00 344357 NMB 2012 10 27 15 34 00 6179-66 P n2o CCGG 325.480 0.260 ... H4 2012 12 03 14 52 00 -23.5800 15.0300 461.00 456.00 5.00 344358 NMB 2012 11 02 16 07 00 1437-99 P n2o CCGG 325.290 0.260 ... H4 2012 12 03 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 344353 NMB 2012 11 02 16 07 00 5410-99 P n2o CCGG 325.350 0.260 ... H4 2012 12 03 13 51 00 -23.5800 15.0300 461.00 456.00 5.00 344354 NMB 2012 11 15 15 32 00 5221-99 P n2o CCGG 325.230 0.260 ... H4 2012 12 03 14 06 00 -23.5800 15.0300 461.00 456.00 5.00 344355 NMB 2012 11 15 15 32 00 5325-99 P n2o CCGG 325.300 0.260 ... H4 2012 12 03 14 21 00 -23.5800 15.0300 461.00 456.00 5.00 344356 NMB 2012 11 22 15 50 00 783-99 P n2o CCGG 325.490 0.260 ... H6 2013 01 17 14 56 00 -23.5800 15.0300 461.00 456.00 5.00 345564 NMB 2012 11 22 15 50 00 831-99 P n2o CCGG 325.400 0.260 ... H6 2013 01 17 14 40 00 -23.5800 15.0300 461.00 456.00 5.00 345565 NMB 2012 11 29 15 52 00 4707-99 P n2o CCGG 325.600 0.260 ... H6 2013 01 09 14 59 00 -23.5800 15.0300 461.00 456.00 5.00 345563 NMB 2012 11 29 15 52 00 576-99 P n2o CCGG 325.570 0.260 ... H6 2013 01 09 14 43 00 -23.5800 15.0300 461.00 456.00 5.00 345562 NMB 2012 12 06 15 25 00 3287-99 P n2o CCGG 325.890 0.260 ... H4 2013 01 24 15 19 00 -23.5800 15.0300 461.00 456.00 5.00 346501 NMB 2012 12 06 15 25 00 3525-99 P n2o CCGG 325.780 0.260 ... H4 2013 01 24 15 34 00 -23.5800 15.0300 461.00 456.00 5.00 346500 NMB 2012 12 20 15 57 00 1026-99 P n2o CCGG 325.190 0.260 ... H4 2013 01 24 15 04 00 -23.5800 15.0300 461.00 456.00 5.00 346498 NMB 2012 12 20 15 57 00 4088-99 P n2o CCGG 325.430 0.260 ... H4 2013 01 24 14 49 00 -23.5800 15.0300 461.00 456.00 5.00 346499 NMB 2013 01 03 15 40 00 3523-99 P n2o CCGG 325.620 0.260 ... H6 2013 02 22 13 23 00 -23.5800 15.0300 461.00 456.00 5.00 347894 NMB 2013 01 03 15 40 00 4220-99 P n2o CCGG 325.370 0.260 ... H6 2013 02 22 13 39 00 -23.5800 15.0300 461.00 456.00 5.00 347895 NMB 2013 01 10 16 02 00 483-99 P n2o CCGG 326.060 0.260 ... H6 2013 02 22 14 11 00 -23.5800 15.0300 461.00 456.00 5.00 347896 NMB 2013 01 10 16 02 00 5280-99 P n2o CCGG 325.900 0.260 ... H6 2013 02 22 13 55 00 -23.5800 15.0300 461.00 456.00 5.00 347897 NMB 2013 01 17 15 28 00 1889-99 P n2o CCGG 325.100 0.260 ... H6 2013 03 05 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 347962 NMB 2013 01 25 16 00 00 3449-99 P n2o CCGG 325.950 0.260 ... H6 2013 02 26 10 19 00 -23.5800 15.0300 461.00 456.00 5.00 347961 NMB 2013 01 31 16 54 00 2563-99 P n2o CCGG 325.720 0.260 ... H6 2013 02 22 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 347976 NMB 2013 01 31 16 54 00 4488-99 P n2o CCGG 325.720 0.260 ... H6 2013 02 22 12 18 00 -23.5800 15.0300 461.00 456.00 5.00 347975 NMB 2013 02 08 15 31 00 5409-99 P n2o CCGG 324.810 0.260 ... H6 2013 02 22 11 13 00 -23.5800 15.0300 461.00 456.00 5.00 347971 NMB 2013 02 08 15 31 00 594-99 P n2o CCGG 325.260 0.260 ... H6 2013 02 22 11 29 00 -23.5800 15.0300 461.00 456.00 5.00 347972 NMB 2013 02 14 15 32 00 1537-99 P n2o CCGG 326.170 0.260 ... H4 2013 04 17 13 37 00 -23.5800 15.0300 461.00 456.00 5.00 350219 NMB 2013 02 14 15 32 00 2572-99 P n2o CCGG 326.040 0.260 ... H4 2013 04 17 13 53 00 -23.5800 15.0300 461.00 456.00 5.00 350220 NMB 2013 02 21 15 38 00 1499-99 P n2o CCGG 326.230 0.260 ... H4 2013 04 17 11 13 00 -23.5800 15.0300 461.00 456.00 5.00 350218 NMB 2013 02 21 15 38 00 3851-99 P n2o CCGG 326.490 0.260 ... H4 2013 04 17 10 57 00 -23.5800 15.0300 461.00 456.00 5.00 350217 NMB 2013 02 28 15 35 00 2746-99 P n2o CCGG 326.820 0.260 ... H4 2013 04 17 14 57 00 -23.5800 15.0300 461.00 456.00 5.00 350224 NMB 2013 02 28 15 35 00 4080-99 P n2o CCGG 326.120 0.260 ... H4 2013 04 17 14 41 00 -23.5800 15.0300 461.00 456.00 5.00 350223 NMB 2013 03 07 15 16 00 1155-99 P n2o CCGG 325.660 0.260 ... H4 2013 04 17 14 25 00 -23.5800 15.0300 461.00 456.00 5.00 350222 NMB 2013 03 07 15 16 00 4397-99 P n2o CCGG 325.800 0.260 ... H4 2013 04 17 14 09 00 -23.5800 15.0300 461.00 456.00 5.00 350221 NMB 2013 03 14 15 00 00 1176-99 P n2o CCGG 325.650 0.260 ... H4 2013 04 16 09 52 00 -23.5800 15.0300 461.00 456.00 5.00 350150 NMB 2013 03 14 15 00 00 4695-99 P n2o CCGG 326.350 0.260 ... H4 2013 04 16 10 08 00 -23.5800 15.0300 461.00 456.00 5.00 350151 NMB 2013 03 22 16 21 00 408-99 P n2o CCGG 326.250 0.260 ... H4 2013 04 16 10 24 00 -23.5800 15.0300 461.00 456.00 5.00 350149 NMB 2013 03 28 15 32 00 3506-99 P n2o CCGG 325.480 0.260 ... H6 2013 06 07 14 23 00 -23.5800 15.0300 461.00 456.00 5.00 352811 NMB 2013 03 28 15 32 00 4776-99 P n2o CCGG 325.470 0.260 ... H6 2013 06 07 14 39 00 -23.5800 15.0300 461.00 456.00 5.00 352812 NMB 2013 04 04 15 03 00 2505-99 P n2o CCGG 325.390 0.260 ... H6 2013 06 07 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 352814 NMB 2013 04 04 15 03 00 4953-99 P n2o CCGG 325.020 0.260 ... H6 2013 06 07 14 56 00 -23.5800 15.0300 461.00 456.00 5.00 352813 NMB 2013 04 11 15 34 00 1615-99 P n2o CCGG 326.930 0.260 ... H6 2013 06 06 16 47 00 -23.5800 15.0300 461.00 456.00 5.00 352622 NMB 2013 04 11 15 34 00 4270-99 P n2o CCGG 326.970 0.260 ... H6 2013 06 06 16 31 00 -23.5800 15.0300 461.00 456.00 5.00 352621 NMB 2013 04 18 14 23 00 1712-99 P n2o CCGG 324.940 0.260 ... H4 2013 06 06 14 33 00 -23.5800 15.0300 461.00 456.00 5.00 352615 NMB 2013 04 18 14 23 00 4561-99 P n2o CCGG 325.420 0.260 ... H4 2013 06 06 14 49 00 -23.5800 15.0300 461.00 456.00 5.00 352616 NMB 2013 04 25 15 30 00 3169-99 P n2o CCGG 325.830 0.260 ... H4 2013 06 07 10 45 00 -23.5800 15.0300 461.00 456.00 5.00 352612 NMB 2013 04 25 15 30 00 5022-99 P n2o CCGG 325.860 0.260 ... H4 2013 06 07 10 29 00 -23.5800 15.0300 461.00 456.00 5.00 352611 NMB 2013 05 02 14 00 00 3222-99 P n2o CCGG 326.450 0.260 ... H4 2013 06 07 09 57 00 -23.5800 15.0300 461.00 456.00 5.00 352613 NMB 2013 05 02 14 00 00 3459-99 P n2o CCGG 326.570 0.260 ... H4 2013 06 07 10 13 00 -23.5800 15.0300 461.00 456.00 5.00 352614 NMB 2013 05 09 14 49 00 3735-99 P n2o CCGG 326.440 0.260 ... H6 2013 06 07 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 352824 NMB 2013 05 09 14 49 00 4474-99 P n2o CCGG 326.050 0.260 ... H6 2013 06 07 11 41 00 -23.5800 15.0300 461.00 456.00 5.00 352823 NMB 2013 05 16 14 00 00 414-99 P n2o CCGG 326.110 0.260 ... H6 2013 06 07 10 19 00 -23.5800 15.0300 461.00 456.00 5.00 352826 NMB 2013 05 16 14 00 00 937-99 P n2o CCGG 326.120 0.260 ... H6 2013 06 07 10 02 00 -23.5800 15.0300 461.00 456.00 5.00 352825 NMB 2013 05 31 14 28 00 1299-99 P n2o CCGG 325.150 0.260 ... H4 2013 08 20 10 33 00 -23.5800 15.0300 461.00 456.00 5.00 356113 NMB 2013 05 31 14 28 00 213-99 P n2o CCGG 325.520 0.260 ... H4 2013 08 20 10 49 00 -23.5800 15.0300 461.00 456.00 5.00 356114 NMB 2013 06 13 14 21 00 3387-99 P n2o CCGG 325.980 0.260 ... H4 2013 08 20 10 17 00 -23.5800 15.0300 461.00 456.00 5.00 356112 NMB 2013 06 13 14 21 00 3915-99 P n2o CCGG 325.990 0.260 ... H4 2013 08 20 10 01 00 -23.5800 15.0300 461.00 456.00 5.00 356111 NMB 2013 06 21 15 35 00 3448-99 P n2o CCGG 326.210 0.260 ... H4 2013 08 19 16 50 00 -23.5800 15.0300 461.00 456.00 5.00 356109 NMB 2013 06 21 15 35 00 5060-99 P n2o CCGG 325.780 0.260 ... H4 2013 08 19 17 06 00 -23.5800 15.0300 461.00 456.00 5.00 356110 NMB 2013 06 27 14 09 00 4683-99 P n2o CCGG 326.350 0.260 ... H4 2013 08 19 14 26 00 -23.5800 15.0300 461.00 456.00 5.00 356106 NMB 2013 06 27 14 09 00 5284-99 P n2o CCGG 325.980 0.260 ... H4 2013 08 19 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 356105 NMB 2013 07 04 15 30 00 2844-99 P n2o CCGG 326.230 0.260 ... H4 2013 08 19 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 356108 NMB 2013 07 04 15 30 00 4521-99 P n2o CCGG 326.320 0.260 ... H4 2013 08 19 14 42 00 -23.5800 15.0300 461.00 456.00 5.00 356107 NMB 2013 07 11 15 40 00 231-99 P n2o CCGG 326.430 0.260 ... H4 2013 08 20 11 21 00 -23.5800 15.0300 461.00 456.00 5.00 356116 NMB 2013 07 11 15 40 00 552-99 P n2o CCGG 326.350 0.260 ... H4 2013 08 20 11 05 00 -23.5800 15.0300 461.00 456.00 5.00 356115 NMB 2013 07 19 14 09 00 3929-99 P n2o CCGG 325.480 0.260 ... H6 2013 10 24 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 358040 NMB 2013 07 19 14 09 00 933-99 P n2o CCGG 325.370 0.260 ... H6 2013 10 24 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 358041 NMB 2013 08 02 15 45 00 4377-99 P n2o CCGG 326.070 0.260 ... H6 2013 10 24 12 29 00 -23.5800 15.0300 461.00 456.00 5.00 358042 NMB 2013 08 02 15 45 00 446-99 P n2o CCGG 326.090 0.260 ... H6 2013 10 24 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 358043 NMB 2013 08 08 15 40 00 1837-99 P n2o CCGG 326.210 0.260 ... H4 2013 10 24 08 21 00 -23.5800 15.0300 461.00 456.00 5.00 358046 NMB 2013 08 08 15 40 00 2852-99 P n2o CCGG 326.420 0.260 ... H4 2013 10 24 08 37 00 -23.5800 15.0300 461.00 456.00 5.00 358047 NMB 2013 08 15 15 40 00 1748-99 P n2o CCGG 325.630 0.260 ... H6 2013 10 23 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 358056 NMB 2013 08 15 15 40 00 3871-99 P n2o CCGG 326.190 0.260 ... H6 2013 10 23 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 358057 NMB 2013 08 22 15 34 00 3853-99 P n2o CCGG 326.770 0.260 ... H6 2013 10 23 15 26 00 -23.5800 15.0300 461.00 456.00 5.00 358058 NMB 2013 08 22 15 34 00 88-99 P n2o CCGG 326.430 0.260 ... H6 2013 10 23 15 42 00 -23.5800 15.0300 461.00 456.00 5.00 358059 NMB 2013 08 29 15 35 00 2899-99 P n2o CCGG 325.550 0.260 ... H4 2013 11 18 10 10 00 -23.5800 15.0300 461.00 456.00 5.00 359793 NMB 2013 08 29 15 35 00 2899-99 P n2o CCGG 325.560 0.260 ..< H6 2013 11 15 13 20 00 -23.5800 15.0300 461.00 456.00 5.00 359793 NMB 2013 08 29 15 35 00 4707-99 P n2o CCGG 325.940 0.260 ... H4 2013 11 18 10 26 00 -23.5800 15.0300 461.00 456.00 5.00 359794 NMB 2013 09 06 17 35 00 2513-99 P n2o CCGG 326.880 0.260 ... H6 2013 10 23 16 15 00 -23.5800 15.0300 461.00 456.00 5.00 358045 NMB 2013 09 06 17 35 00 4409-99 P n2o CCGG 326.730 0.260 ... H6 2013 10 23 15 58 00 -23.5800 15.0300 461.00 456.00 5.00 358044 NMB 2013 09 12 16 52 00 2573-99 P n2o CCGG 326.460 0.260 ... H6 2013 11 18 12 47 00 -23.5800 15.0300 461.00 456.00 5.00 359815 NMB 2013 09 12 16 52 00 4092-99 P n2o CCGG 326.330 0.260 ... H6 2013 11 18 13 03 00 -23.5800 15.0300 461.00 456.00 5.00 359816 NMB 2013 09 27 15 13 00 2349-99 P n2o CCGG 325.930 0.260 ... H4 2013 11 18 12 02 00 -23.5800 15.0300 461.00 456.00 5.00 359810 NMB 2013 09 27 15 13 00 5190-99 P n2o CCGG 325.900 0.260 ... H4 2013 11 18 11 46 00 -23.5800 15.0300 461.00 456.00 5.00 359809 NMB 2013 10 01 15 15 00 1809-99 P n2o CCGG 326.630 0.260 ... H6 2013 11 18 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 359812 NMB 2013 10 01 15 15 00 633-99 P n2o CCGG 326.360 0.260 ... H6 2013 11 18 12 14 00 -23.5800 15.0300 461.00 456.00 5.00 359811 NMB 2013 10 04 15 55 00 2620-99 P n2o CCGG 326.470 0.260 ... H6 2013 11 15 10 38 00 -23.5800 15.0300 461.00 456.00 5.00 359807 NMB 2013 10 04 15 55 00 2965-99 P n2o CCGG 326.390 0.260 ... H6 2013 11 15 10 54 00 -23.5800 15.0300 461.00 456.00 5.00 359808 NMB 2013 10 10 15 51 00 2292-99 P n2o CCGG 326.370 0.260 ... H4 2013 11 18 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 359814 NMB 2013 10 10 15 51 00 519-99 P n2o CCGG 326.340 0.260 ... H4 2013 11 18 12 18 00 -23.5800 15.0300 461.00 456.00 5.00 359813 NMB 2013 10 24 02 35 00 4292-99 P n2o CCGG 326.430 0.260 ... H6 2014 03 18 14 38 00 -23.5800 15.0300 461.00 456.00 5.00 365437 NMB 2013 10 24 02 35 00 882-99 P n2o CCGG 325.750 0.260 ... H6 2014 03 18 14 54 00 -23.5800 15.0300 461.00 456.00 5.00 365438 NMB 2013 11 07 15 35 00 1249-99 P n2o CCGG 326.380 0.260 ... H6 2014 03 18 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 365433 NMB 2013 11 07 15 35 00 4739-99 P n2o CCGG 326.380 0.260 ... H6 2014 03 18 14 21 00 -23.5800 15.0300 461.00 456.00 5.00 365434 NMB 2013 11 14 04 05 00 2680-99 P n2o CCGG 326.090 0.260 ... H6 2014 03 20 11 54 00 -23.5800 15.0300 461.00 456.00 5.00 365442 NMB 2013 11 14 04 05 00 2744-99 P n2o CCGG 326.030 0.260 ... H6 2014 03 20 11 37 00 -23.5800 15.0300 461.00 456.00 5.00 365441 NMB 2013 11 21 14 25 00 5042-99 P n2o CCGG 325.760 0.260 ... H6 2014 03 20 11 21 00 -23.5800 15.0300 461.00 456.00 5.00 365448 NMB 2013 11 21 14 25 00 6018-66 P n2o CCGG 326.390 0.260 ... H6 2014 03 20 11 05 00 -23.5800 15.0300 461.00 456.00 5.00 365447 NMB 2013 11 28 15 42 00 1487-99 P n2o CCGG 328.140 0.260 .X. H6 2014 03 20 12 44 00 -23.5800 15.0300 461.00 456.00 5.00 365443 NMB 2013 11 28 15 42 00 4496-99 P n2o CCGG 327.740 0.260 .X. H6 2014 03 20 13 01 00 -23.5800 15.0300 461.00 456.00 5.00 365444 NMB 2013 12 05 15 30 00 4209-99 P n2o CCGG 326.630 0.260 ... H6 2014 03 20 12 26 00 -23.5800 15.0300 461.00 456.00 5.00 365446 NMB 2013 12 05 15 30 00 4338-99 P n2o CCGG 326.420 0.260 ... H6 2014 03 20 12 10 00 -23.5800 15.0300 461.00 456.00 5.00 365445 NMB 2013 12 12 15 14 00 6826-66 P n2o CCGG 326.540 0.260 ... H6 2014 03 19 10 27 00 -23.5800 15.0300 461.00 456.00 5.00 365428 NMB 2013 12 12 15 14 00 6839-66 P n2o CCGG 326.300 0.260 ... H6 2014 03 19 10 11 00 -23.5800 15.0300 461.00 456.00 5.00 365427 NMB 2013 12 19 15 14 00 2822-99 P n2o CCGG 326.230 0.260 ... H6 2014 03 19 11 16 00 -23.5800 15.0300 461.00 456.00 5.00 365426 NMB 2013 12 27 16 27 00 1289-99 P n2o CCGG 326.460 0.260 ... H6 2014 03 19 14 14 00 -23.5800 15.0300 461.00 456.00 5.00 365407 NMB 2013 12 27 16 27 00 5193-99 P n2o CCGG 326.490 0.260 ... H6 2014 03 19 13 58 00 -23.5800 15.0300 461.00 456.00 5.00 365406 NMB 2014 01 09 15 35 00 4635-99 P n2o CCGG 325.930 0.260 ... H6 2014 03 18 15 59 00 -23.5800 15.0300 461.00 456.00 5.00 365436 NMB 2014 01 09 15 35 00 5407-99 P n2o CCGG 325.930 0.260 ... H6 2014 03 18 15 43 00 -23.5800 15.0300 461.00 456.00 5.00 365435 NMB 2014 01 16 14 50 00 2058-99 P n2o CCGG 326.450 0.260 ... H6 2014 03 18 15 10 00 -23.5800 15.0300 461.00 456.00 5.00 365439 NMB 2014 01 16 14 50 00 5143-99 P n2o CCGG 326.510 0.260 ... H6 2014 03 18 15 27 00 -23.5800 15.0300 461.00 456.00 5.00 365440 NMB 2014 02 06 15 24 00 5405-99 P n2o CCGG 326.360 0.260 ... H4 2014 07 07 16 42 00 -23.5800 15.0300 461.00 456.00 5.00 369914 NMB 2014 03 13 15 19 00 3846-99 P n2o CCGG 326.270 0.260 ... H4 2014 07 08 08 49 00 -23.5800 15.0300 461.00 456.00 5.00 369909 NMB 2014 03 13 15 19 00 674-99 P n2o CCGG 326.220 0.260 ... H4 2014 07 08 08 33 00 -23.5800 15.0300 461.00 456.00 5.00 369908 NMB 2014 04 03 15 55 00 1347-99 P n2o CCGG 327.160 0.260 ... H4 2014 07 08 09 05 00 -23.5800 15.0300 461.00 456.00 5.00 369912 NMB 2014 04 03 15 55 00 321-99 P n2o CCGG 326.970 0.260 ... H4 2014 07 08 09 21 00 -23.5800 15.0300 461.00 456.00 5.00 369913 NMB 2014 04 17 15 15 00 1641-99 P n2o CCGG 326.960 0.260 ... H4 2014 07 03 16 43 00 -23.5800 15.0300 461.00 456.00 5.00 369895 NMB 2014 04 17 15 15 00 1806-99 P n2o CCGG 327.030 0.260 ... H4 2014 07 03 16 27 00 -23.5800 15.0300 461.00 456.00 5.00 369894 NMB 2014 04 24 15 15 00 255-99 P n2o CCGG 373.880 -999.990 N.. H4 2014 07 03 15 55 00 -23.5800 15.0300 461.00 456.00 5.00 369892 NMB 2014 04 24 15 15 00 357-99 P n2o CCGG 327.380 0.260 ... H4 2014 07 03 16 11 00 -23.5800 15.0300 461.00 456.00 5.00 369893 NMB 2014 05 02 15 15 00 3748-99 P n2o CCGG 326.680 0.260 ... H4 2014 07 08 11 29 00 -23.5800 15.0300 461.00 456.00 5.00 369905 NMB 2014 05 02 15 15 00 542-99 P n2o CCGG 327.010 0.260 ... H4 2014 07 08 11 13 00 -23.5800 15.0300 461.00 456.00 5.00 369904 NMB 2014 05 09 15 15 00 2909-99 P n2o CCGG 326.180 0.260 ... H4 2014 07 08 12 01 00 -23.5800 15.0300 461.00 456.00 5.00 369907 NMB 2014 05 09 15 15 00 322-99 P n2o CCGG 325.810 0.260 ... H4 2014 07 08 11 45 00 -23.5800 15.0300 461.00 456.00 5.00 369906 NMB 2014 05 16 15 10 00 1870-99 P n2o CCGG 326.390 0.260 ... H4 2014 07 07 16 26 00 -23.5800 15.0300 461.00 456.00 5.00 369891 NMB 2014 05 23 15 10 00 2178-99 P n2o CCGG 327.180 0.260 ... H4 2014 07 08 10 57 00 -23.5800 15.0300 461.00 456.00 5.00 369903 NMB 2014 05 23 15 10 00 2816-99 P n2o CCGG 324.360 0.260 N.. H4 2014 07 08 10 41 00 -23.5800 15.0300 461.00 456.00 5.00 369902 NMB 2014 05 30 15 42 00 3808-99 P n2o CCGG 327.070 0.260 ... H4 2014 07 07 17 14 00 -23.5800 15.0300 461.00 456.00 5.00 369911 NMB 2014 05 30 15 42 00 4377-99 P n2o CCGG 326.900 0.260 ... H4 2014 07 07 16 58 00 -23.5800 15.0300 461.00 456.00 5.00 369910 NMB 2014 06 06 15 40 00 3527-99 P n2o CCGG 325.860 0.260 ... H4 2015 05 12 12 06 00 -23.5800 15.0300 461.00 456.00 5.00 385840 NMB 2014 06 06 15 40 00 4892-99 P n2o CCGG 325.970 0.260 ... H4 2015 05 12 12 22 00 -23.5800 15.0300 461.00 456.00 5.00 385841 NMB 2014 06 13 15 00 00 150-99 P n2o CCGG 327.130 0.260 ... H4 2015 03 06 15 19 00 -23.5800 15.0300 461.00 456.00 5.00 382036 NMB 2014 06 13 15 00 00 3632-99 P n2o CCGG 326.910 0.260 ... H4 2015 03 06 15 03 00 -23.5800 15.0300 461.00 456.00 5.00 382035 NMB 2014 06 20 14 51 00 1167-99 P n2o CCGG 326.550 0.260 ... H4 2015 03 06 15 35 00 -23.5800 15.0300 461.00 456.00 5.00 382037 NMB 2014 06 20 14 51 00 3834-99 P n2o CCGG 326.640 0.260 ... H4 2015 03 06 15 51 00 -23.5800 15.0300 461.00 456.00 5.00 382038 NMB 2014 07 04 15 24 00 4003-99 P n2o CCGG 326.930 0.260 ... H4 2015 03 06 14 47 00 -23.5800 15.0300 461.00 456.00 5.00 382034 NMB 2014 07 04 15 24 00 4955-99 P n2o CCGG 326.830 0.260 ... H4 2015 03 06 14 31 00 -23.5800 15.0300 461.00 456.00 5.00 382033 NMB 2014 08 01 15 15 00 1636-99 P n2o CCGG 326.890 0.260 ... H4 2014 11 07 12 16 00 -23.5800 15.0300 461.00 456.00 5.00 376580 NMB 2014 08 22 15 33 00 1016-99 P n2o CCGG 327.500 0.260 ... H4 2014 11 07 11 12 00 -23.5800 15.0300 461.00 456.00 5.00 376581 NMB 2014 08 22 15 33 00 1211-99 P n2o CCGG 327.410 0.260 ... H4 2014 11 07 11 28 00 -23.5800 15.0300 461.00 456.00 5.00 376582 NMB 2014 08 29 14 50 00 2850-99 P n2o CCGG 326.570 0.260 ... H4 2015 05 12 13 25 00 -23.5800 15.0300 461.00 456.00 5.00 377282 NMB 2014 08 29 14 50 00 5062-99 P n2o CCGG 326.670 0.260 ... H4 2015 05 12 13 10 00 -23.5800 15.0300 461.00 456.00 5.00 377281 NMB 2014 09 05 15 48 00 3163-99 P n2o CCGG 327.230 0.260 ... H4 2015 05 12 13 57 00 -23.5800 15.0300 461.00 456.00 5.00 377283 NMB 2014 09 05 15 48 00 3164-99 P n2o CCGG 326.880 0.260 ... H4 2015 05 12 13 41 00 -23.5800 15.0300 461.00 456.00 5.00 377284 NMB 2014 09 12 15 25 00 2076-99 P n2o CCGG 326.960 0.260 N.. H4 2014 11 03 11 03 00 -23.5800 15.0300 461.00 456.00 5.00 376536 NMB 2014 09 12 15 25 00 5265-99 P n2o CCGG 327.000 0.260 ... H4 2014 11 03 10 47 00 -23.5800 15.0300 461.00 456.00 5.00 376537 NMB 2014 09 19 15 45 00 4766-99 P n2o CCGG 326.810 0.260 ... H4 2014 11 03 10 31 00 -23.5800 15.0300 461.00 456.00 5.00 376539 NMB 2014 09 19 15 45 00 837-99 P n2o CCGG 327.220 0.260 ... H4 2014 11 03 10 15 00 -23.5800 15.0300 461.00 456.00 5.00 376538 NMB 2014 09 26 15 31 00 5141-99 P n2o CCGG 327.100 0.260 ... H4 2015 05 12 12 54 00 -23.5800 15.0300 461.00 456.00 5.00 377286 NMB 2014 09 26 15 31 00 796-99 P n2o CCGG 326.840 0.260 ... H4 2015 05 12 12 38 00 -23.5800 15.0300 461.00 456.00 5.00 377285 NMB 2014 10 03 16 05 00 249-99 P n2o CCGG 327.160 0.260 ... H4 2015 05 12 14 45 00 -23.5800 15.0300 461.00 456.00 5.00 377287 NMB 2014 10 03 16 05 00 69-99 P n2o CCGG 327.320 0.260 ... H4 2015 05 12 15 01 00 -23.5800 15.0300 461.00 456.00 5.00 377288 NMB 2014 10 10 15 59 00 3534-99 P n2o CCGG 326.680 0.260 ... H4 2015 03 06 14 16 00 -23.5800 15.0300 461.00 456.00 5.00 382032 NMB 2014 10 10 15 59 00 3909-99 P n2o CCGG 326.980 0.260 ... H4 2015 03 06 14 00 00 -23.5800 15.0300 461.00 456.00 5.00 382031 NMB 2014 10 31 15 34 00 5059-99 P n2o CCGG 327.380 0.260 ... H4 2015 05 12 11 50 00 -23.5800 15.0300 461.00 456.00 5.00 385839 NMB 2014 10 31 15 34 00 882-99 P n2o CCGG 327.300 0.260 ... H4 2015 05 12 11 34 00 -23.5800 15.0300 461.00 456.00 5.00 385838 NMB 2014 11 14 16 38 00 3902-99 P n2o CCGG 327.520 0.260 ... H4 2015 03 04 14 26 00 -23.5800 15.0300 461.00 456.00 5.00 381907 NMB 2014 11 14 16 38 00 4292-99 P n2o CCGG 327.370 0.260 ... H4 2015 03 04 14 42 00 -23.5800 15.0300 461.00 456.00 5.00 381908 NMB 2014 11 20 16 24 00 1967-99 P n2o CCGG 327.350 0.260 ... H4 2015 03 02 11 42 00 -23.5800 15.0300 461.00 456.00 5.00 381927 NMB 2014 11 20 16 24 00 4828-99 P n2o CCGG 327.100 0.260 ... H4 2015 03 02 11 58 00 -23.5800 15.0300 461.00 456.00 5.00 381928 NMB 2014 11 27 13 45 00 288-99 P n2o CCGG 327.180 0.260 ... H4 2015 03 02 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 381925 NMB 2014 11 27 13 45 00 3055-99 P n2o CCGG 327.140 0.260 ... H4 2015 03 02 12 14 00 -23.5800 15.0300 461.00 456.00 5.00 381926 NMB 2014 12 05 15 19 00 4005-99 P n2o CCGG 327.390 0.260 ... H4 2015 03 02 10 54 00 -23.5800 15.0300 461.00 456.00 5.00 381923 NMB 2014 12 05 15 19 00 439-99 P n2o CCGG 327.650 0.260 ... H4 2015 03 02 11 10 00 -23.5800 15.0300 461.00 456.00 5.00 381924 NMB 2014 12 11 16 10 00 2008-99 P n2o CCGG 327.470 0.260 ... H4 2015 03 04 16 02 00 -23.5800 15.0300 461.00 456.00 5.00 381913 NMB 2014 12 11 16 10 00 2621-99 P n2o CCGG 327.610 0.260 ... H4 2015 03 04 16 18 00 -23.5800 15.0300 461.00 456.00 5.00 381914 NMB 2014 12 18 15 21 00 2654-99 P n2o CCGG 327.750 0.260 ... H4 2015 03 04 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 381911 NMB 2014 12 18 15 21 00 6593-66 P n2o CCGG 327.220 0.260 ... H4 2015 03 04 15 14 00 -23.5800 15.0300 461.00 456.00 5.00 381912 NMB 2014 12 28 15 31 00 2672-99 P n2o CCGG 327.160 0.260 ... H4 2015 03 04 15 46 00 -23.5800 15.0300 461.00 456.00 5.00 381909 NMB 2014 12 28 15 31 00 5147-99 P n2o CCGG 326.990 0.260 ... H4 2015 03 04 15 30 00 -23.5800 15.0300 461.00 456.00 5.00 381910 NMB 2015 01 02 16 56 00 228-99 P n2o CCGG 327.320 0.260 ... H4 2015 05 12 14 29 00 -23.5800 15.0300 461.00 456.00 5.00 385837 NMB 2015 01 02 16 56 00 646-99 P n2o CCGG 327.440 0.260 ... H4 2015 05 12 14 13 00 -23.5800 15.0300 461.00 456.00 5.00 385836 NMB 2015 01 08 15 00 00 1238-99 P n2o CCGG 327.850 0.260 ... H4 2015 03 03 16 46 00 -23.5800 15.0300 461.00 456.00 5.00 381921 NMB 2015 01 08 15 00 00 3054-99 P n2o CCGG 327.420 0.260 ... H4 2015 03 03 17 02 00 -23.5800 15.0300 461.00 456.00 5.00 381922 NMB 2015 01 16 15 02 00 152-99 P n2o CCGG 327.350 0.260 ... H4 2015 03 02 12 46 00 -23.5800 15.0300 461.00 456.00 5.00 381929 NMB 2015 01 16 15 02 00 4100-99 P n2o CCGG 327.640 0.260 ... H4 2015 03 02 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 381930 NMB 2015 01 30 15 18 00 322-99 P n2o CCGG 327.410 0.260 ... H4 2015 07 01 10 49 00 -23.5800 15.0300 461.00 456.00 5.00 388324 NMB 2015 01 30 15 18 00 621-99 P n2o CCGG 327.380 0.260 ... H4 2015 07 01 11 04 00 -23.5800 15.0300 461.00 456.00 5.00 388325 NMB 2015 02 05 15 42 00 1118-99 P n2o CCGG 327.870 0.260 ... H4 2015 07 01 11 20 00 -23.5800 15.0300 461.00 456.00 5.00 388322 NMB 2015 02 05 15 42 00 4276-99 P n2o CCGG 328.020 0.260 ... H4 2015 07 01 11 36 00 -23.5800 15.0300 461.00 456.00 5.00 388323 NMB 2015 02 14 17 42 00 184-99 P n2o CCGG 328.020 0.260 ... H4 2015 07 01 09 44 00 -23.5800 15.0300 461.00 456.00 5.00 388318 NMB 2015 02 14 17 42 00 4687-99 P n2o CCGG 328.180 0.260 ... H4 2015 07 01 09 59 00 -23.5800 15.0300 461.00 456.00 5.00 388319 NMB 2015 02 20 15 55 00 3623-99 P n2o CCGG 327.710 0.260 ... H4 2015 07 01 10 17 00 -23.5800 15.0300 461.00 456.00 5.00 388320 NMB 2015 02 20 15 55 00 4471-99 P n2o CCGG 328.240 0.260 ... H4 2015 07 01 10 33 00 -23.5800 15.0300 461.00 456.00 5.00 388321 NMB 2015 03 06 14 06 00 1365-99 P n2o CCGG 328.220 0.260 ... H4 2015 07 01 14 14 00 -23.5800 15.0300 461.00 456.00 5.00 388288 NMB 2015 03 06 14 06 00 3447-99 P n2o CCGG 327.740 0.260 ... H4 2015 07 01 14 30 00 -23.5800 15.0300 461.00 456.00 5.00 388289 NMB 2015 03 13 15 45 00 3513-99 P n2o CCGG 327.750 0.260 ... H4 2015 07 01 13 58 00 -23.5800 15.0300 461.00 456.00 5.00 388293 NMB 2015 03 13 15 45 00 6217-66 P n2o CCGG 327.740 0.260 ... H4 2015 07 01 13 43 00 -23.5800 15.0300 461.00 456.00 5.00 388292 NMB 2015 03 19 15 59 00 1222-99 P n2o CCGG 327.920 0.260 ... H4 2015 07 07 08 45 00 -23.5800 15.0300 461.00 456.00 5.00 388305 NMB 2015 03 19 15 59 00 26-99 P n2o CCGG 327.570 0.260 ... H4 2015 07 07 08 30 00 -23.5800 15.0300 461.00 456.00 5.00 388304 NMB 2015 03 26 13 59 00 4673-99 P n2o CCGG 327.550 0.260 ... H4 2015 07 06 16 57 00 -23.5800 15.0300 461.00 456.00 5.00 388302 NMB 2015 03 26 13 59 00 4683-99 P n2o CCGG 327.480 0.260 N.. H4 2015 07 06 17 13 00 -23.5800 15.0300 461.00 456.00 5.00 388303 NMB 2015 04 02 14 50 00 2675-99 P n2o CCGG 327.870 0.260 ... H4 2016 04 15 15 32 00 -23.5800 15.0300 461.00 456.00 5.00 405134 NMB 2015 04 02 14 50 00 509-99 P n2o CCGG 327.800 0.260 ... H4 2016 04 15 15 16 00 -23.5800 15.0300 461.00 456.00 5.00 405133 NMB 2015 04 09 16 42 00 462-99 P n2o CCGG 328.180 0.260 ... H4 2016 04 15 14 44 00 -23.5800 15.0300 461.00 456.00 5.00 405135 NMB 2015 04 09 16 42 00 4769-99 P n2o CCGG 328.510 0.260 ... H4 2016 04 15 15 00 00 -23.5800 15.0300 461.00 456.00 5.00 405136 NMB 2015 04 16 14 37 00 1600-99 P n2o CCGG 330.000 0.260 .X. H4 2015 07 06 12 28 00 -23.5800 15.0300 461.00 456.00 5.00 388299 NMB 2015 04 16 14 37 00 3910-99 P n2o CCGG 330.000 0.260 .X. H4 2015 07 06 12 12 00 -23.5800 15.0300 461.00 456.00 5.00 388298 NMB 2015 04 30 15 21 00 5021-99 P n2o CCGG 328.680 0.260 ... H4 2015 07 06 11 56 00 -23.5800 15.0300 461.00 456.00 5.00 388301 NMB 2015 04 30 15 21 00 738-99 P n2o CCGG 328.840 0.260 ... H4 2015 07 06 11 40 00 -23.5800 15.0300 461.00 456.00 5.00 388300 NMB 2015 05 06 13 15 00 2962-99 P n2o CCGG 328.310 0.260 ... H4 2015 07 01 12 08 00 -23.5800 15.0300 461.00 456.00 5.00 388271 NMB 2015 05 06 13 15 00 3492-99 P n2o CCGG 328.500 0.260 ... H4 2015 07 01 11 52 00 -23.5800 15.0300 461.00 456.00 5.00 388270 NMB 2015 05 14 15 30 00 1000-99 P n2o CCGG 327.920 0.260 ... H4 2015 07 01 13 11 00 -23.5800 15.0300 461.00 456.00 5.00 388280 NMB 2015 05 14 15 30 00 4912-99 P n2o CCGG 327.630 0.260 ... H4 2015 07 01 13 27 00 -23.5800 15.0300 461.00 456.00 5.00 388281 NMB 2015 05 21 15 38 00 3687-99 P n2o CCGG 328.600 0.260 ... H4 2015 07 06 10 36 00 -23.5800 15.0300 461.00 456.00 5.00 388294 NMB 2015 05 21 15 38 00 4784-99 P n2o CCGG 328.450 0.260 ... H4 2015 07 06 10 52 00 -23.5800 15.0300 461.00 456.00 5.00 388295 NMB 2015 05 28 14 34 00 2902-99 P n2o CCGG 328.360 0.260 ... H4 2015 07 06 11 24 00 -23.5800 15.0300 461.00 456.00 5.00 388297 NMB 2015 05 28 14 34 00 3514-99 P n2o CCGG 328.570 0.260 N.. H4 2015 07 06 11 08 00 -23.5800 15.0300 461.00 456.00 5.00 388296 NMB 2015 06 04 15 53 00 1920-99 P n2o CCGG 327.120 0.260 ... H4 2015 09 21 10 17 00 -23.5800 15.0300 461.00 456.00 5.00 393979 NMB 2015 06 04 15 53 00 5144-99 P n2o CCGG 327.080 0.260 ... H4 2015 09 21 10 33 00 -23.5800 15.0300 461.00 456.00 5.00 393980 NMB 2015 06 11 15 08 00 118-99 P n2o CCGG 328.050 0.260 ... H4 2015 09 21 11 05 00 -23.5800 15.0300 461.00 456.00 5.00 393977 NMB 2015 06 11 15 08 00 4221-99 P n2o CCGG 327.900 0.260 ... H4 2015 09 21 10 49 00 -23.5800 15.0300 461.00 456.00 5.00 393978 NMB 2015 06 18 15 17 00 1653-99 P n2o CCGG 328.150 0.260 ... H4 2015 09 17 15 59 00 -23.5800 15.0300 461.00 456.00 5.00 393988 NMB 2015 06 18 15 17 00 2256-99 P n2o CCGG 328.060 0.260 ... H4 2015 09 17 15 43 00 -23.5800 15.0300 461.00 456.00 5.00 393987 NMB 2015 06 25 15 56 00 145-99 P n2o CCGG 327.430 0.260 ... H4 2015 09 17 15 12 00 -23.5800 15.0300 461.00 456.00 5.00 393985 NMB 2015 06 25 15 56 00 3297-99 P n2o CCGG 327.320 0.260 ... H4 2015 09 17 15 28 00 -23.5800 15.0300 461.00 456.00 5.00 393986 NMB 2015 07 02 15 00 00 3722-99 P n2o CCGG 328.390 0.260 ... H4 2015 09 17 17 03 00 -23.5800 15.0300 461.00 456.00 5.00 393989 NMB 2015 07 02 15 00 00 4199-99 P n2o CCGG 328.460 0.260 ... H4 2015 09 17 16 47 00 -23.5800 15.0300 461.00 456.00 5.00 393990 NMB 2015 07 16 15 16 00 3818-99 P n2o CCGG 327.540 0.260 ... H4 2015 09 17 16 31 00 -23.5800 15.0300 461.00 456.00 5.00 393991 NMB 2015 07 16 15 16 00 4009-99 P n2o CCGG 327.280 0.260 ... H4 2015 09 17 16 15 00 -23.5800 15.0300 461.00 456.00 5.00 393992 NMB 2015 07 23 15 06 00 2325-99 P n2o CCGG 327.350 0.260 ... H4 2015 09 18 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 394022 NMB 2015 07 23 15 06 00 3140-99 P n2o CCGG 327.280 0.260 ... H4 2015 09 18 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 394021 NMB 2015 07 30 15 06 00 2694-99 P n2o CCGG 327.660 0.260 ... H4 2015 09 18 11 11 00 -23.5800 15.0300 461.00 456.00 5.00 394023 NMB 2015 07 30 15 06 00 966-99 P n2o CCGG 327.480 0.260 ... H4 2015 09 18 10 55 00 -23.5800 15.0300 461.00 456.00 5.00 394024 NMB 2015 08 14 15 25 00 2177-99 P n2o CCGG 327.980 0.260 ... H4 2015 09 18 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 394017 NMB 2015 08 14 15 25 00 3064-99 P n2o CCGG 328.330 0.260 ... H4 2015 09 18 12 46 00 -23.5800 15.0300 461.00 456.00 5.00 394018 NMB 2015 08 21 15 20 00 1925-99 P n2o CCGG 328.300 0.260 ... H4 2015 09 18 12 14 00 -23.5800 15.0300 461.00 456.00 5.00 394020 NMB 2015 08 21 15 20 00 754-99 P n2o CCGG 328.180 0.260 ... H4 2015 09 18 11 58 00 -23.5800 15.0300 461.00 456.00 5.00 394019 NMB 2015 09 13 16 20 00 194-99 P n2o CCGG 328.010 0.260 ... H4 2016 04 14 12 43 00 -23.5800 15.0300 461.00 456.00 5.00 405122 NMB 2015 09 13 16 20 00 4877-99 P n2o CCGG 328.340 0.260 ... H4 2016 04 14 12 58 00 -23.5800 15.0300 461.00 456.00 5.00 405123 NMB 2015 09 17 15 25 00 3103-99 P n2o CCGG 327.870 0.260 ... H4 2016 04 14 12 11 00 -23.5800 15.0300 461.00 456.00 5.00 405120 NMB 2015 09 17 15 25 00 4395-99 P n2o CCGG 328.450 0.260 ... H4 2016 04 14 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 405119 NMB 2015 12 18 08 38 00 2302-99 P n2o CCGG 328.170 0.260 ... H4 2016 04 12 14 48 00 -23.5800 15.0300 461.00 456.00 5.00 405099 NMB 2015 12 18 08 38 00 933-99 P n2o CCGG 328.450 0.260 ... H4 2016 04 12 15 04 00 -23.5800 15.0300 461.00 456.00 5.00 405100 NMB 2015 12 30 16 53 00 1699-99 P n2o CCGG 328.980 0.260 ... H4 2016 04 15 14 29 00 -23.5800 15.0300 461.00 456.00 5.00 405132 NMB 2015 12 30 16 53 00 4402-99 P n2o CCGG 329.190 0.260 ... H4 2016 04 15 14 13 00 -23.5800 15.0300 461.00 456.00 5.00 405131 NMB 2016 01 08 15 29 00 2585-99 P n2o CCGG 332.000 0.260 .X. H4 2016 04 15 13 57 00 -23.5800 15.0300 461.00 456.00 5.00 405129 NMB 2016 01 08 15 29 00 5206-99 P n2o CCGG 331.760 0.260 .X. H4 2016 04 15 13 41 00 -23.5800 15.0300 461.00 456.00 5.00 405130 NMB 2016 01 15 16 03 00 3857-99 P n2o CCGG 328.700 0.260 ... H4 2016 04 12 16 08 00 -23.5800 15.0300 461.00 456.00 5.00 405103 NMB 2016 01 15 16 03 00 4732-99 P n2o CCGG 328.780 0.260 ... H4 2016 04 12 15 52 00 -23.5800 15.0300 461.00 456.00 5.00 405104 NMB 2016 01 22 16 35 00 2419-99 P n2o CCGG 328.480 0.260 ... H4 2016 04 14 10 36 00 -23.5800 15.0300 461.00 456.00 5.00 405113 NMB 2016 01 22 16 35 00 2663-99 P n2o CCGG 328.340 0.260 ... H4 2016 04 14 10 52 00 -23.5800 15.0300 461.00 456.00 5.00 405114 NMB 2016 02 04 15 00 00 1095-99 P n2o CCGG 329.550 0.260 ... H4 2016 04 14 11 39 00 -23.5800 15.0300 461.00 456.00 5.00 405117 NMB 2016 02 04 15 00 00 410-99 P n2o CCGG 329.500 0.260 ... H4 2016 04 14 11 55 00 -23.5800 15.0300 461.00 456.00 5.00 405118 NMB 2016 02 12 14 25 00 2983-99 P n2o CCGG 328.720 0.260 ... H4 2016 04 14 11 24 00 -23.5800 15.0300 461.00 456.00 5.00 405115 NMB 2016 02 12 14 25 00 825-99 P n2o CCGG 332.270 0.260 N.. H4 2016 04 14 11 08 00 -23.5800 15.0300 461.00 456.00 5.00 405116 NMB 2016 02 19 17 05 00 2984-99 P n2o CCGG 328.300 0.260 ... H4 2016 08 04 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 411389 NMB 2016 02 19 17 05 00 4993-99 P n2o CCGG 328.000 0.260 ... H4 2016 08 04 12 29 00 -23.5800 15.0300 461.00 456.00 5.00 411390 NMB 2016 02 25 15 45 00 687-99 P n2o CCGG 328.760 0.260 ... H4 2016 04 14 13 30 00 -23.5800 15.0300 461.00 456.00 5.00 405124 NMB 2016 03 10 16 00 00 1252-99 P n2o CCGG 329.410 0.260 ... H4 2016 04 14 14 33 00 -23.5800 15.0300 461.00 456.00 5.00 405126 NMB 2016 03 10 16 00 00 1512-99 P n2o CCGG 329.740 0.260 ... H4 2016 04 14 14 18 00 -23.5800 15.0300 461.00 456.00 5.00 405125 NMB 2016 03 14 15 36 00 2090-99 P n2o CCGG 329.400 0.260 ... H4 2016 06 20 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 408860 NMB 2016 03 14 15 36 00 2654-99 P n2o CCGG 329.100 0.260 ... H4 2016 06 20 12 29 00 -23.5800 15.0300 461.00 456.00 5.00 408859 NMB 2016 03 17 16 31 00 3256-99 P n2o CCGG 328.740 0.260 ... H4 2016 04 14 14 02 00 -23.5800 15.0300 461.00 456.00 5.00 405128 NMB 2016 03 17 16 31 00 992-99 P n2o CCGG 328.850 0.260 ... H4 2016 04 14 13 46 00 -23.5800 15.0300 461.00 456.00 5.00 405127 NMB 2016 03 24 14 45 00 243-99 P n2o CCGG 329.290 0.260 ... H4 2016 04 12 15 20 00 -23.5800 15.0300 461.00 456.00 5.00 405101 NMB 2016 03 24 14 45 00 3049-99 P n2o CCGG 329.340 0.260 ... H4 2016 04 12 15 36 00 -23.5800 15.0300 461.00 456.00 5.00 405102 NMB 2016 04 01 15 30 00 2752-99 P n2o CCGG 328.550 0.260 ... H4 2016 06 20 11 41 00 -23.5800 15.0300 461.00 456.00 5.00 408862 NMB 2016 04 01 15 30 00 3258-99 P n2o CCGG 328.850 0.260 ... H4 2016 06 20 11 25 00 -23.5800 15.0300 461.00 456.00 5.00 408861 NMB 2016 04 22 13 22 00 1146-99 P n2o CCGG 329.030 0.260 ... H4 2016 06 21 09 34 00 -23.5800 15.0300 461.00 456.00 5.00 408726 NMB 2016 04 22 13 22 00 4507-99 P n2o CCGG -999.990 -999.990 *.. H4 2016 06 21 09 19 00 -23.5800 15.0300 461.00 456.00 5.00 408727 NMB 2016 04 22 13 22 00 4507-99 P n2o CCGG 329.020 0.260 ... H4 2016 06 21 11 25 00 -23.5800 15.0300 461.00 456.00 5.00 408727 NMB 2016 04 28 14 43 00 2446-99 P n2o CCGG 330.060 0.260 ... H4 2016 06 21 09 50 00 -23.5800 15.0300 461.00 456.00 5.00 408724 NMB 2016 04 28 14 43 00 3777-99 P n2o CCGG 329.810 0.260 ... H4 2016 06 21 10 06 00 -23.5800 15.0300 461.00 456.00 5.00 408725 NMB 2016 05 06 15 08 00 1268-99 P n2o CCGG 328.730 0.260 ... H4 2016 08 04 13 33 00 -23.5800 15.0300 461.00 456.00 5.00 411561 NMB 2016 05 06 15 08 00 5405-99 P n2o CCGG 328.690 0.260 ... H4 2016 08 04 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 411562 NMB 2016 05 12 15 35 00 2468-99 P n2o CCGG 328.310 0.260 ... H4 2016 06 20 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 408865 NMB 2016 05 12 15 35 00 2798-99 P n2o CCGG 327.840 0.260 ... H4 2016 06 20 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 408866 NMB 2016 05 19 14 31 00 3371-99 P n2o CCGG 328.650 0.260 ... H4 2016 08 04 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 411560 NMB 2016 05 19 14 31 00 3685-99 P n2o CCGG 328.630 0.260 ... H4 2016 08 04 13 01 00 -23.5800 15.0300 461.00 456.00 5.00 411559 NMB 2016 05 27 14 03 00 3714-99 P n2o CCGG 328.600 0.260 ... H4 2016 06 20 13 48 00 -23.5800 15.0300 461.00 456.00 5.00 408864 NMB 2016 05 27 14 03 00 3998-99 P n2o CCGG 329.110 0.260 ... H4 2016 06 20 13 32 00 -23.5800 15.0300 461.00 456.00 5.00 408863 NMB 2016 06 02 14 20 00 4075-99 P n2o CCGG 329.210 0.260 ... H4 2016 08 01 10 23 00 -23.5800 15.0300 461.00 456.00 5.00 411274 NMB 2016 06 02 14 20 00 4173-99 P n2o CCGG 329.380 0.260 ... H4 2016 08 01 10 38 00 -23.5800 15.0300 461.00 456.00 5.00 411275 NMB 2016 06 09 15 05 00 2794-99 P n2o CCGG 328.000 0.260 ... H4 2016 07 27 10 03 00 -23.5800 15.0300 461.00 456.00 5.00 411029 NMB 2016 06 15 13 30 00 3289-99 P n2o CCGG 330.810 0.260 N.. H4 2016 07 29 14 51 00 -23.5800 15.0300 461.00 456.00 5.00 411272 NMB 2016 06 15 13 30 00 3355-99 P n2o CCGG 328.700 0.260 ... H4 2016 07 29 15 06 00 -23.5800 15.0300 461.00 456.00 5.00 411273 NMB 2016 06 23 12 36 00 1357-99 P n2o CCGG 329.030 0.260 ... H4 2016 08 01 09 51 00 -23.5800 15.0300 461.00 456.00 5.00 411270 NMB 2016 06 23 12 36 00 752-99 P n2o CCGG 328.780 0.260 ... H4 2016 08 01 10 07 00 -23.5800 15.0300 461.00 456.00 5.00 411271 NMB 2016 07 01 14 50 00 1764-99 P n2o CCGG 327.830 0.260 ... H4 2016 07 27 09 48 00 -23.5800 15.0300 461.00 456.00 5.00 411032 NMB 2016 07 01 14 50 00 4752-99 P n2o CCGG 328.430 0.260 ... H4 2016 07 27 09 32 00 -23.5800 15.0300 461.00 456.00 5.00 411031 NMB 2016 07 07 15 00 00 3372-99 P n2o CCGG -999.990 -999.990 *.. H4 2016 07 27 10 19 00 -23.5800 15.0300 461.00 456.00 5.00 411030 NMB 2016 07 13 14 00 00 4606-99 P n2o CCGG 328.250 0.260 ... H4 2016 10 11 11 42 00 -23.5800 15.0300 461.00 456.00 5.00 414846 NMB 2016 07 13 14 00 00 4672-99 P n2o CCGG 328.050 0.260 ... H4 2016 10 11 11 26 00 -23.5800 15.0300 461.00 456.00 5.00 414847 NMB 2016 07 21 14 05 00 1220-99 P n2o CCGG 328.620 0.260 ... H4 2016 10 11 10 23 00 -23.5800 15.0300 461.00 456.00 5.00 414844 NMB 2016 07 21 14 05 00 2791-99 P n2o CCGG 328.250 0.260 ... H4 2016 10 11 10 39 00 -23.5800 15.0300 461.00 456.00 5.00 414845 NMB 2016 07 28 15 40 00 579-99 P n2o CCGG 327.840 0.260 ... H4 2016 10 12 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 414767 NMB 2016 07 28 15 40 00 799-99 P n2o CCGG 328.080 0.260 ... H4 2016 10 12 14 26 00 -23.5800 15.0300 461.00 456.00 5.00 414766 NMB 2016 08 04 15 20 00 1395-99 P n2o CCGG 328.190 0.260 ... H4 2016 10 12 14 42 00 -23.5800 15.0300 461.00 456.00 5.00 414803 NMB 2016 08 04 15 20 00 4354-99 P n2o CCGG 328.060 0.260 ... H4 2016 10 12 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 414804 NMB 2016 08 11 14 40 00 4250-99 P n2o CCGG -999.990 -999.990 *.. H4 2016 10 12 13 39 00 -23.5800 15.0300 461.00 456.00 5.00 414802 NMB 2016 08 19 13 50 00 4171-99 P n2o CCGG 328.600 0.260 ... H4 2016 10 11 11 11 00 -23.5800 15.0300 461.00 456.00 5.00 414843 NMB 2016 08 19 13 50 00 907-99 P n2o CCGG 328.630 0.260 ... H4 2016 10 11 10 55 00 -23.5800 15.0300 461.00 456.00 5.00 414842 NMB 2016 08 24 14 30 00 4617-99 P n2o CCGG 328.800 0.260 ... H4 2016 10 12 15 30 00 -23.5800 15.0300 461.00 456.00 5.00 414806 NMB 2016 08 24 14 30 00 754-99 P n2o CCGG 328.590 0.260 ... H4 2016 10 12 15 14 00 -23.5800 15.0300 461.00 456.00 5.00 414807 NMB 2016 09 01 15 05 00 4795-99 P n2o CCGG 328.380 0.260 ... H4 2016 10 12 13 54 00 -23.5800 15.0300 461.00 456.00 5.00 414805 NMB 2016 09 07 15 25 00 1868-99 P n2o CCGG 328.820 0.260 ... H4 2016 10 06 14 19 00 -23.5800 15.0300 461.00 456.00 5.00 414808 NMB 2016 09 07 15 25 00 3427-99 P n2o CCGG 328.620 0.260 ... H4 2016 10 06 14 35 00 -23.5800 15.0300 461.00 456.00 5.00 414809 NMB 2016 09 15 14 27 00 4928-99 P n2o CCGG 328.150 0.260 ... H4 2016 10 06 15 07 00 -23.5800 15.0300 461.00 456.00 5.00 414811 NMB 2016 09 15 14 27 00 647-99 P n2o CCGG 328.510 0.260 ... H4 2016 10 06 14 51 00 -23.5800 15.0300 461.00 456.00 5.00 414810 NMB 2016 09 22 14 22 00 5300-99 P n2o CCGG 328.550 0.260 ... H4 2016 12 28 12 21 00 -23.5800 15.0300 461.00 456.00 5.00 418439 NMB 2016 09 22 14 22 00 5536-99 P n2o CCGG 328.610 0.260 ... H4 2016 12 28 12 36 00 -23.5800 15.0300 461.00 456.00 5.00 418440 NMB 2016 09 29 14 01 00 1132-99 P n2o CCGG 327.980 0.260 A.. H4 2016 12 28 10 45 00 -23.5800 15.0300 461.00 456.00 5.00 418437 NMB 2016 09 29 14 01 00 5568-99 P n2o CCGG 329.010 0.260 ... H4 2016 12 28 11 01 00 -23.5800 15.0300 461.00 456.00 5.00 418438 NMB 2016 10 06 16 15 00 1104-99 P n2o CCGG 329.330 0.260 ... H4 2016 12 28 11 49 00 -23.5800 15.0300 461.00 456.00 5.00 418433 NMB 2016 10 06 16 15 00 1190-99 P n2o CCGG 329.290 0.260 ... H4 2016 12 28 12 05 00 -23.5800 15.0300 461.00 456.00 5.00 418434 NMB 2016 10 20 14 32 00 3504-99 P n2o CCGG 327.840 0.260 ... H4 2016 12 28 10 09 00 -23.5800 15.0300 461.00 456.00 5.00 418435 NMB 2016 10 20 14 32 00 4556-99 P n2o CCGG 327.900 0.260 ... H4 2016 12 28 10 25 00 -23.5800 15.0300 461.00 456.00 5.00 418436 NMB 2016 10 26 14 39 00 2790-99 P n2o CCGG 329.020 0.260 ... H4 2016 12 27 10 40 00 -23.5800 15.0300 461.00 456.00 5.00 418447 NMB 2016 10 26 14 39 00 5679-99 P n2o CCGG 328.810 0.260 ... H4 2016 12 27 10 56 00 -23.5800 15.0300 461.00 456.00 5.00 418448 NMB 2016 11 03 14 18 00 2500-99 P n2o CCGG 328.820 0.260 ... H4 2016 12 27 11 14 00 -23.5800 15.0300 461.00 456.00 5.00 418445 NMB 2016 11 03 14 18 00 5503-99 P n2o CCGG 328.470 0.260 ... H4 2016 12 27 11 30 00 -23.5800 15.0300 461.00 456.00 5.00 418446 NMB 2016 11 10 14 13 00 4162-99 P n2o CCGG 329.350 0.260 ... H4 2016 12 27 14 26 00 -23.5800 15.0300 461.00 456.00 5.00 418426 NMB 2016 11 10 14 13 00 5055-99 P n2o CCGG 329.280 0.260 ... H4 2016 12 27 14 42 00 -23.5800 15.0300 461.00 456.00 5.00 418427 NMB 2016 11 17 14 31 00 3171-99 P n2o CCGG 328.610 0.260 ... H4 2016 12 27 15 13 00 -23.5800 15.0300 461.00 456.00 5.00 418428 NMB 2016 11 17 14 31 00 687-99 P n2o CCGG 329.850 0.260 ... H4 2016 12 27 14 58 00 -23.5800 15.0300 461.00 456.00 5.00 418429 NMB 2016 11 24 14 54 00 4388-99 P n2o CCGG 329.570 0.260 ... H4 2016 12 27 10 09 00 -23.5800 15.0300 461.00 456.00 5.00 418441 NMB 2016 11 24 14 54 00 5101-99 P n2o CCGG 328.530 0.260 ... H4 2016 12 27 10 24 00 -23.5800 15.0300 461.00 456.00 5.00 418442 NMB 2016 11 30 14 14 00 3355-99 P n2o CCGG 328.710 0.260 ... H4 2016 12 27 09 37 00 -23.5800 15.0300 461.00 456.00 5.00 418443 NMB 2016 11 30 14 14 00 5632-99 P n2o CCGG 329.090 0.260 ... H4 2016 12 27 09 53 00 -23.5800 15.0300 461.00 456.00 5.00 418444 NMB 2016 12 08 14 37 00 4800-99 P n2o CCGG 328.920 0.260 ... H4 2017 03 23 10 37 00 -23.5800 15.0300 461.00 456.00 5.00 422498 NMB 2016 12 08 14 37 00 4825-99 P n2o CCGG 328.940 0.260 ... H4 2017 03 23 10 52 00 -23.5800 15.0300 461.00 456.00 5.00 422499 NMB 2016 12 15 14 41 00 1755-99 P n2o CCGG 329.090 0.260 ... H4 2017 03 23 11 40 00 -23.5800 15.0300 461.00 456.00 5.00 422496 NMB 2016 12 15 14 41 00 3086-99 P n2o CCGG 328.900 0.260 ... H4 2017 03 23 11 56 00 -23.5800 15.0300 461.00 456.00 5.00 422497 NMB 2016 12 21 14 29 00 3347-99 P n2o CCGG 329.080 0.260 ... H4 2017 03 22 12 25 00 -23.5800 15.0300 461.00 456.00 5.00 422492 NMB 2016 12 21 14 29 00 571-99 P n2o CCGG 329.280 0.260 ... H4 2017 03 22 12 09 00 -23.5800 15.0300 461.00 456.00 5.00 422493 NMB 2016 12 29 14 19 00 1131-99 P n2o CCGG 329.680 0.260 ... H4 2017 03 22 12 41 00 -23.5800 15.0300 461.00 456.00 5.00 422490 NMB 2016 12 29 14 19 00 1137-99 P n2o CCGG 329.220 0.260 ... H4 2017 03 22 12 57 00 -23.5800 15.0300 461.00 456.00 5.00 422491 NMB 2017 01 05 14 23 00 2401-99 P n2o CCGG 328.260 0.260 ... H4 2017 03 22 11 22 00 -23.5800 15.0300 461.00 456.00 5.00 422488 NMB 2017 01 05 14 23 00 576-99 P n2o CCGG 328.980 0.260 ... H4 2017 03 22 11 06 00 -23.5800 15.0300 461.00 456.00 5.00 422489 NMB 2017 01 12 14 24 00 1466-99 P n2o CCGG 328.890 0.260 ... H4 2017 03 22 11 38 00 -23.5800 15.0300 461.00 456.00 5.00 422486 NMB 2017 01 12 14 24 00 4431-99 P n2o CCGG 328.910 0.260 ... H4 2017 03 22 11 53 00 -23.5800 15.0300 461.00 456.00 5.00 422487 NMB 2017 01 19 14 48 00 256-99 P n2o CCGG 328.940 0.260 ... H4 2017 03 23 13 54 00 -23.5800 15.0300 461.00 456.00 5.00 422500 NMB 2017 01 19 14 48 00 3980-99 P n2o CCGG 328.880 0.260 ... H4 2017 03 23 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 422501 NMB 2017 01 25 14 23 00 2260-99 P n2o CCGG 329.950 0.260 ... H4 2017 03 17 12 40 00 -23.5800 15.0300 461.00 456.00 5.00 422526 NMB 2017 01 25 14 23 00 391-99 P n2o CCGG 329.740 0.260 ... H4 2017 03 17 12 24 00 -23.5800 15.0300 461.00 456.00 5.00 422527 NMB 2017 02 02 14 52 00 4908-99 P n2o CCGG 329.490 0.260 ... H4 2017 03 23 11 24 00 -23.5800 15.0300 461.00 456.00 5.00 422495 NMB 2017 02 02 14 52 00 714-99 P n2o CCGG 328.820 0.260 ... H4 2017 03 23 11 08 00 -23.5800 15.0300 461.00 456.00 5.00 422494 NMB 2017 02 09 14 54 00 3197-99 P n2o CCGG 331.080 0.260 .X. H4 2017 03 22 17 32 00 -23.5800 15.0300 461.00 456.00 5.00 422484 NMB 2017 02 09 14 54 00 3439-99 P n2o CCGG 331.180 0.260 .X. H4 2017 03 22 17 48 00 -23.5800 15.0300 461.00 456.00 5.00 422485 NMB 2017 03 01 14 23 00 3871-99 P n2o CCGG 329.130 0.260 ... H4 2017 06 06 13 09 00 -23.5800 15.0300 461.00 456.00 5.00 426067 NMB 2017 03 01 14 23 00 4666-99 P n2o CCGG 328.910 0.260 ... H4 2017 06 06 13 25 00 -23.5800 15.0300 461.00 456.00 5.00 426068 NMB 2017 03 09 14 54 00 3768-99 P n2o CCGG 334.640 0.260 N.. H4 2017 06 06 13 56 00 -23.5800 15.0300 461.00 456.00 5.00 426063 NMB 2017 03 09 14 54 00 782-99 P n2o CCGG 329.740 0.260 ... H4 2017 06 06 13 41 00 -23.5800 15.0300 461.00 456.00 5.00 426064 NMB 2017 03 17 15 20 00 3613-99 P n2o CCGG 330.100 0.260 ... H4 2017 06 06 11 50 00 -23.5800 15.0300 461.00 456.00 5.00 426066 NMB 2017 03 17 15 20 00 948-99 P n2o CCGG 329.950 0.260 ... H4 2017 06 06 11 34 00 -23.5800 15.0300 461.00 456.00 5.00 426065 NMB 2017 03 23 15 41 00 3338-99 P n2o CCGG 330.380 0.260 ... H4 2017 06 06 11 02 00 -23.5800 15.0300 461.00 456.00 5.00 426061 NMB 2017 03 23 15 41 00 4410-99 P n2o CCGG 329.940 0.260 ... H4 2017 06 06 11 18 00 -23.5800 15.0300 461.00 456.00 5.00 426062 NMB 2017 03 30 15 57 00 3934-99 P n2o CCGG 329.850 0.260 ... H4 2017 06 06 10 30 00 -23.5800 15.0300 461.00 456.00 5.00 426084 NMB 2017 03 30 15 57 00 3976-99 P n2o CCGG 329.630 0.260 ... H4 2017 06 06 10 46 00 -23.5800 15.0300 461.00 456.00 5.00 426083 NMB 2017 04 06 13 31 00 3207-99 P n2o CCGG 330.700 0.260 ... H4 2017 06 06 08 55 00 -23.5800 15.0300 461.00 456.00 5.00 426081 NMB 2017 04 06 13 31 00 4224-99 P n2o CCGG 330.500 0.260 ... H4 2017 06 06 09 11 00 -23.5800 15.0300 461.00 456.00 5.00 426082 NMB 2017 04 13 15 31 00 1136-99 P n2o CCGG 329.670 0.260 ... H4 2017 06 05 11 55 00 -23.5800 15.0300 461.00 456.00 5.00 426071 NMB 2017 04 13 15 31 00 5572-99 P n2o CCGG 329.420 0.260 ... H4 2017 06 05 12 11 00 -23.5800 15.0300 461.00 456.00 5.00 426072 NMB 2017 04 27 14 23 00 1550-99 P n2o CCGG 329.740 0.260 ... H4 2017 06 05 11 23 00 -23.5800 15.0300 461.00 456.00 5.00 426070 NMB 2017 04 27 14 23 00 4881-99 P n2o CCGG 330.190 0.260 ... H4 2017 06 05 11 39 00 -23.5800 15.0300 461.00 456.00 5.00 426069 NMB 2017 05 04 13 08 00 213-99 P n2o CCGG 329.380 0.260 ... H4 2017 06 05 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 426075 NMB 2017 05 04 13 08 00 425-99 P n2o CCGG 329.450 0.260 ... H4 2017 06 05 12 43 00 -23.5800 15.0300 461.00 456.00 5.00 426076 NMB 2017 05 11 13 11 00 4271-99 P n2o CCGG 330.690 0.260 ... H4 2017 06 05 12 59 00 -23.5800 15.0300 461.00 456.00 5.00 426073 NMB 2017 05 11 13 11 00 4831-99 P n2o CCGG 330.220 0.260 ... H4 2017 06 05 13 14 00 -23.5800 15.0300 461.00 456.00 5.00 426074 NMB 2017 05 18 12 22 00 3043-99 P n2o CCGG 328.620 0.430 ... H4 2017 09 05 17 09 00 -23.5800 15.0300 461.00 456.00 5.00 430032 NMB 2017 05 18 12 22 00 3836-99 P n2o CCGG 328.500 0.430 ... H4 2017 09 05 17 25 00 -23.5800 15.0300 461.00 456.00 5.00 430033 NMB 2017 05 25 12 26 00 2099-99 P n2o CCGG 330.040 0.430 ... H4 2017 09 05 16 38 00 -23.5800 15.0300 461.00 456.00 5.00 430036 NMB 2017 05 25 12 26 00 5574-99 P n2o CCGG 329.390 0.430 ... H4 2017 09 05 16 54 00 -23.5800 15.0300 461.00 456.00 5.00 430037 NMB 2017 06 01 12 42 00 4012-99 P n2o CCGG 329.370 0.430 ... H4 2017 09 01 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 430018 NMB 2017 06 01 12 42 00 5583-99 P n2o CCGG 329.090 0.430 ... H4 2017 09 01 12 46 00 -23.5800 15.0300 461.00 456.00 5.00 430019 NMB 2017 06 08 13 18 00 4361-99 P n2o CCGG 328.940 0.430 ... H4 2017 09 01 11 59 00 -23.5800 15.0300 461.00 456.00 5.00 430020 NMB 2017 06 08 13 18 00 5028-99 P n2o CCGG 328.940 0.430 ... H4 2017 09 01 12 14 00 -23.5800 15.0300 461.00 456.00 5.00 430021 NMB 2017 06 15 13 36 00 2108-99 P n2o CCGG 330.050 0.430 ... H4 2017 09 07 15 32 00 -23.5800 15.0300 461.00 456.00 5.00 429988 NMB 2017 06 15 13 36 00 2232-99 P n2o CCGG 330.270 0.430 ... H4 2017 09 07 15 48 00 -23.5800 15.0300 461.00 456.00 5.00 429989 NMB 2017 06 22 13 26 00 362-99 P n2o CCGG 330.120 0.430 ... H4 2017 09 07 16 04 00 -23.5800 15.0300 461.00 456.00 5.00 429992 NMB 2017 06 22 13 26 00 4551-99 P n2o CCGG 329.620 0.430 ... H4 2017 09 07 16 20 00 -23.5800 15.0300 461.00 456.00 5.00 429993 NMB 2017 06 29 13 08 00 3424-99 P n2o CCGG 330.830 0.430 ... H4 2017 09 07 16 36 00 -23.5800 15.0300 461.00 456.00 5.00 429990 NMB 2017 06 29 13 08 00 5217-99 P n2o CCGG 330.990 0.430 ... H4 2017 09 07 16 52 00 -23.5800 15.0300 461.00 456.00 5.00 429991 NMB 2017 07 06 13 34 00 4909-99 P n2o CCGG 329.510 0.430 ... H4 2017 09 08 08 40 00 -23.5800 15.0300 461.00 456.00 5.00 429994 NMB 2017 07 06 13 34 00 5373-99 P n2o CCGG 329.220 0.430 ... H4 2017 09 08 08 56 00 -23.5800 15.0300 461.00 456.00 5.00 429995 NMB 2017 07 13 14 17 00 1409-99 P n2o CCGG 330.760 0.430 A.. H4 2017 09 05 14 31 00 -23.5800 15.0300 461.00 456.00 5.00 430030 NMB 2017 07 13 14 17 00 5148-99 P n2o CCGG 329.940 0.430 ... H4 2017 09 05 14 47 00 -23.5800 15.0300 461.00 456.00 5.00 430031 NMB 2017 07 20 13 05 00 2941-99 P n2o CCGG 329.910 0.430 ... H4 2017 09 05 16 06 00 -23.5800 15.0300 461.00 456.00 5.00 430035 NMB 2017 07 20 13 05 00 5502-99 P n2o CCGG 329.600 0.430 ... H4 2017 09 05 16 22 00 -23.5800 15.0300 461.00 456.00 5.00 430034 NMB 2017 07 28 13 30 00 462-99 P n2o CCGG 329.840 0.430 ... H4 2017 09 01 11 27 00 -23.5800 15.0300 461.00 456.00 5.00 430016 NMB 2017 07 28 13 30 00 5499-99 P n2o CCGG 329.460 0.430 ... H4 2017 09 01 11 43 00 -23.5800 15.0300 461.00 456.00 5.00 430017 NMB 2017 08 03 11 48 00 5424-99 P n2o CCGG 329.360 0.430 ... H4 2017 09 01 11 11 00 -23.5800 15.0300 461.00 456.00 5.00 430015 NMB 2017 08 03 11 48 00 552-99 P n2o CCGG 329.720 0.430 ... H4 2017 09 01 10 55 00 -23.5800 15.0300 461.00 456.00 5.00 430014 NMB 2017 08 10 13 51 00 5185-99 P n2o CCGG 329.310 0.430 ... H4 2017 11 15 08 42 00 -23.5800 15.0300 461.00 456.00 5.00 433908 NMB 2017 08 10 13 51 00 929-99 P n2o CCGG 329.210 0.430 ... H4 2017 11 15 08 26 00 -23.5800 15.0300 461.00 456.00 5.00 433907 NMB 2017 08 17 13 25 00 3161-99 P n2o CCGG 328.250 0.430 ... H4 2017 11 14 16 00 00 -23.5800 15.0300 461.00 456.00 5.00 433905 NMB 2017 08 17 13 25 00 5586-99 P n2o CCGG 328.850 0.430 ... H4 2017 11 14 16 16 00 -23.5800 15.0300 461.00 456.00 5.00 433906 NMB 2017 08 24 13 07 00 1995-99 P n2o CCGG 331.030 0.430 ... H4 2017 11 09 14 07 00 -23.5800 15.0300 461.00 456.00 5.00 433899 NMB 2017 08 24 13 07 00 3558-99 P n2o CCGG 330.550 0.430 ... H4 2017 11 09 14 23 00 -23.5800 15.0300 461.00 456.00 5.00 433900 NMB 2017 09 01 13 04 00 4407-99 P n2o CCGG 330.840 0.430 ... H4 2017 11 09 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 433897 NMB 2017 09 01 13 04 00 4977-99 P n2o CCGG 329.890 0.430 ... H4 2017 11 09 13 52 00 -23.5800 15.0300 461.00 456.00 5.00 433898 NMB 2017 09 07 14 22 00 4482-99 P n2o CCGG 330.670 0.430 ... H4 2017 11 09 13 20 00 -23.5800 15.0300 461.00 456.00 5.00 433894 NMB 2017 09 07 14 22 00 766-99 P n2o CCGG 330.340 0.430 ... H4 2017 11 09 13 04 00 -23.5800 15.0300 461.00 456.00 5.00 433893 NMB 2017 09 15 15 22 00 2561-99 P n2o CCGG 330.130 0.430 ... H4 2017 11 09 14 39 00 -23.5800 15.0300 461.00 456.00 5.00 433895 NMB 2017 09 15 15 22 00 3351-99 P n2o CCGG 329.420 0.430 ... H4 2017 11 09 14 55 00 -23.5800 15.0300 461.00 456.00 5.00 433896 NMB 2017 09 21 15 20 00 1214-99 P n2o CCGG 331.060 0.430 ... H4 2017 11 14 15 29 00 -23.5800 15.0300 461.00 456.00 5.00 433903 NMB 2017 09 21 15 20 00 5002-99 P n2o CCGG 330.530 0.430 ... H4 2017 11 14 15 44 00 -23.5800 15.0300 461.00 456.00 5.00 433904 NMB 2017 09 28 14 54 00 3113-99 P n2o CCGG 329.970 0.430 ... H4 2017 11 14 14 57 00 -23.5800 15.0300 461.00 456.00 5.00 433902 NMB 2017 09 28 14 54 00 3777-99 P n2o CCGG 330.200 0.430 ... H4 2017 11 14 15 13 00 -23.5800 15.0300 461.00 456.00 5.00 433901 NMB 2017 10 05 15 20 00 1629-99 P n2o CCGG 329.700 0.430 ... H4 2017 11 09 09 22 00 -23.5800 15.0300 461.00 456.00 5.00 433887 NMB 2017 10 05 15 20 00 1747-99 P n2o CCGG 329.290 0.430 ... H4 2017 11 09 09 38 00 -23.5800 15.0300 461.00 456.00 5.00 433888 NMB 2017 10 12 10 02 00 2524-99 P n2o CCGG 330.810 0.430 ... H4 2017 11 09 11 29 00 -23.5800 15.0300 461.00 456.00 5.00 433885 NMB 2017 10 12 10 02 00 2745-99 P n2o CCGG 331.360 0.430 ... H4 2017 11 09 11 45 00 -23.5800 15.0300 461.00 456.00 5.00 433886 NMB 2017 10 18 15 03 00 3221-99 P n2o CCGG 329.330 0.430 ... H4 2017 11 09 15 11 00 -23.5800 15.0300 461.00 456.00 5.00 433925 NMB 2017 10 18 15 03 00 3652-99 P n2o CCGG 329.930 0.430 ... H4 2017 11 09 15 27 00 -23.5800 15.0300 461.00 456.00 5.00 433926 NMB 2017 10 26 13 57 00 2414-99 P n2o CCGG 330.450 0.430 ... H4 2018 01 25 09 41 00 -23.5800 15.0300 461.00 456.00 5.00 437286 NMB 2017 10 26 13 57 00 5292-99 P n2o CCGG 330.910 0.430 ... H4 2018 01 25 09 56 00 -23.5800 15.0300 461.00 456.00 5.00 437287 NMB 2017 11 03 14 34 00 2211-99 P n2o CCGG 330.050 0.430 ... H4 2018 01 25 10 12 00 -23.5800 15.0300 461.00 456.00 5.00 437288 NMB 2017 11 03 14 34 00 5016-99 P n2o CCGG 330.010 0.430 ... H4 2018 01 25 10 28 00 -23.5800 15.0300 461.00 456.00 5.00 437289 NMB 2017 11 09 15 12 00 51-99 P n2o CCGG 329.810 0.430 ... H4 2018 01 19 15 20 00 -23.5800 15.0300 461.00 456.00 5.00 437314 NMB 2017 11 09 15 12 00 5218-99 P n2o CCGG 329.280 0.430 ... H4 2018 01 19 15 36 00 -23.5800 15.0300 461.00 456.00 5.00 437315 NMB 2017 11 16 13 38 00 2200-99 P n2o CCGG 329.540 0.430 ... H4 2018 01 19 14 48 00 -23.5800 15.0300 461.00 456.00 5.00 437312 NMB 2017 11 16 13 38 00 5633-99 P n2o CCGG 327.840 0.430 N.. H4 2018 01 19 15 04 00 -23.5800 15.0300 461.00 456.00 5.00 437313 NMB 2017 11 23 14 21 00 1775-99 P n2o CCGG 330.140 0.430 ... H4 2018 01 19 14 01 00 -23.5800 15.0300 461.00 456.00 5.00 437309 NMB 2017 11 23 14 21 00 413-99 P n2o CCGG 330.310 0.430 ... H4 2018 01 19 13 45 00 -23.5800 15.0300 461.00 456.00 5.00 437308 NMB 2017 11 30 16 04 00 4158-99 P n2o CCGG 330.350 0.430 ... H4 2018 01 19 14 33 00 -23.5800 15.0300 461.00 456.00 5.00 437311 NMB 2017 11 30 16 04 00 77-99 P n2o CCGG 330.230 0.430 ... H4 2018 01 19 14 17 00 -23.5800 15.0300 461.00 456.00 5.00 437310 NMB 2017 12 07 15 02 00 1091-99 P n2o CCGG 329.340 0.430 ... H4 2018 01 31 09 37 00 -23.5800 15.0300 461.00 456.00 5.00 437605 NMB 2017 12 07 15 02 00 3183-99 P n2o CCGG 329.930 0.430 ... H4 2018 01 31 09 53 00 -23.5800 15.0300 461.00 456.00 5.00 437606 NMB 2017 12 14 15 20 00 2599-99 P n2o CCGG 329.960 0.430 ... H4 2018 01 31 09 05 00 -23.5800 15.0300 461.00 456.00 5.00 437601 NMB 2017 12 14 15 20 00 4119-99 P n2o CCGG 331.270 0.430 ... H4 2018 01 31 09 21 00 -23.5800 15.0300 461.00 456.00 5.00 437602 NMB 2017 12 20 14 55 00 2181-99 P n2o CCGG 329.720 0.430 ... H4 2018 01 31 10 08 00 -23.5800 15.0300 461.00 456.00 5.00 437607 NMB 2017 12 20 14 55 00 2398-99 P n2o CCGG 330.410 0.430 ... H4 2018 01 31 10 24 00 -23.5800 15.0300 461.00 456.00 5.00 437608 NMB 2017 12 27 15 04 00 318-99 P n2o CCGG 330.240 0.430 ... H4 2018 01 31 10 42 00 -23.5800 15.0300 461.00 456.00 5.00 437603 NMB 2017 12 27 15 04 00 3232-99 P n2o CCGG 330.670 0.430 ... H4 2018 01 31 10 58 00 -23.5800 15.0300 461.00 456.00 5.00 437604 NMB 2018 01 04 14 56 00 2357-99 P n2o CCGG 331.190 0.430 ... H4 2018 04 09 11 58 00 -23.5800 15.0300 461.00 456.00 5.00 441164 NMB 2018 01 04 14 56 00 2559-99 P n2o CCGG 330.530 0.430 ... H4 2018 04 09 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 441165 NMB 2018 01 11 14 57 00 3210-99 P n2o CCGG 329.170 0.430 ... H4 2018 04 09 12 29 00 -23.5800 15.0300 461.00 456.00 5.00 441168 NMB 2018 01 11 14 57 00 3950-99 P n2o CCGG 330.500 0.430 ... H4 2018 04 09 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 441169 NMB 2018 01 18 14 56 00 1586-99 P n2o CCGG 331.140 0.430 ... H4 2018 04 09 14 55 00 -23.5800 15.0300 461.00 456.00 5.00 441193 NMB 2018 01 18 14 56 00 424-99 P n2o CCGG 330.990 0.430 ... H4 2018 04 09 14 39 00 -23.5800 15.0300 461.00 456.00 5.00 441192 NMB 2018 01 25 15 15 00 1911-99 P n2o CCGG 330.080 0.430 ... H4 2018 04 09 14 07 00 -23.5800 15.0300 461.00 456.00 5.00 441188 NMB 2018 01 25 15 15 00 5356-99 P n2o CCGG 330.570 0.430 ... H4 2018 04 09 14 23 00 -23.5800 15.0300 461.00 456.00 5.00 441189 NMB 2018 02 01 15 36 00 145-99 P n2o CCGG 331.160 0.430 ... H4 2018 04 11 10 41 00 -23.5800 15.0300 461.00 456.00 5.00 441279 NMB 2018 02 01 15 36 00 1469-99 P n2o CCGG 331.290 0.430 ... H4 2018 04 11 10 57 00 -23.5800 15.0300 461.00 456.00 5.00 441280 NMB 2018 02 08 15 14 00 1517-99 P n2o CCGG 331.320 0.430 N.. H4 2018 04 11 10 25 00 -23.5800 15.0300 461.00 456.00 5.00 441278 NMB 2018 02 08 15 14 00 169-99 P n2o CCGG 329.490 0.430 N.. H4 2018 04 11 10 09 00 -23.5800 15.0300 461.00 456.00 5.00 441277 NMB 2018 02 16 14 45 00 4922-99 P n2o CCGG 330.480 0.430 ... H4 2018 04 09 13 20 00 -23.5800 15.0300 461.00 456.00 5.00 441166 NMB 2018 02 16 14 45 00 574-99 P n2o CCGG 329.470 0.430 ... H4 2018 04 09 13 04 00 -23.5800 15.0300 461.00 456.00 5.00 441167 NMB 2018 02 23 13 31 00 1325-99 P n2o CCGG 331.410 0.430 ... H4 2018 04 09 13 36 00 -23.5800 15.0300 461.00 456.00 5.00 441170 NMB 2018 02 23 13 31 00 4983-99 P n2o CCGG 331.610 0.430 ... H4 2018 04 09 13 51 00 -23.5800 15.0300 461.00 456.00 5.00 441171 NMB 2018 03 01 13 41 00 3281-99 P n2o CCGG 330.770 0.430 ... H4 2018 04 09 15 42 00 -23.5800 15.0300 461.00 456.00 5.00 441194 NMB 2018 03 01 13 41 00 5580-99 P n2o CCGG 330.110 0.430 ... H4 2018 04 09 15 58 00 -23.5800 15.0300 461.00 456.00 5.00 441195 NMB 2018 03 08 14 00 00 1776-99 P n2o CCGG 330.930 0.430 ... H4 2018 04 09 15 11 00 -23.5800 15.0300 461.00 456.00 5.00 441190 NMB 2018 03 08 14 00 00 4516-99 P n2o CCGG 331.540 0.430 ... H4 2018 04 09 15 27 00 -23.5800 15.0300 461.00 456.00 5.00 441191 NMB 2018 03 16 13 38 00 3121-99 P n2o CCGG 333.050 0.430 .X. H4 2018 06 11 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 444902 NMB 2018 03 16 13 38 00 4580-99 P n2o CCGG 333.800 0.430 .X. H4 2018 06 11 12 45 00 -23.5800 15.0300 461.00 456.00 5.00 444903 NMB 2018 03 22 13 45 00 1573-99 P n2o CCGG 332.620 0.430 N.. H4 2018 06 11 13 01 00 -23.5800 15.0300 461.00 456.00 5.00 444898 NMB 2018 03 22 13 45 00 2479-99 P n2o CCGG 330.960 0.430 N.. H4 2018 06 11 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 444899 NMB 2018 03 29 13 20 00 4167-99 P n2o CCGG 330.480 0.430 ... H4 2018 06 11 11 58 00 -23.5800 15.0300 461.00 456.00 5.00 444900 NMB 2018 03 29 13 20 00 4508-99 P n2o CCGG 330.670 0.430 ... H4 2018 06 11 12 14 00 -23.5800 15.0300 461.00 456.00 5.00 444901 NMB 2018 04 05 16 15 00 4836-99 P n2o CCGG 331.400 0.430 ... H4 2018 06 11 11 26 00 -23.5800 15.0300 461.00 456.00 5.00 444896 NMB 2018 04 05 16 15 00 5500-99 P n2o CCGG 330.780 0.430 ... H4 2018 06 11 11 42 00 -23.5800 15.0300 461.00 456.00 5.00 444897 NMB 2018 04 12 13 50 00 1226-99 P n2o CCGG 329.880 0.430 ... H4 2018 06 12 12 11 00 -23.5800 15.0300 461.00 456.00 5.00 444907 NMB 2018 04 12 13 50 00 960-99 P n2o CCGG 331.020 0.430 ... H4 2018 06 12 11 55 00 -23.5800 15.0300 461.00 456.00 5.00 444906 NMB 2018 04 19 13 37 00 37-99 P n2o CCGG 330.990 0.430 ... H4 2018 06 12 11 24 00 -23.5800 15.0300 461.00 456.00 5.00 444908 NMB 2018 04 19 13 37 00 546-99 P n2o CCGG 330.630 0.430 ... H4 2018 06 12 11 40 00 -23.5800 15.0300 461.00 456.00 5.00 444909 NMB 2018 05 03 13 50 00 3214-99 P n2o CCGG 331.230 0.430 ... H4 2018 06 08 12 13 00 -23.5800 15.0300 461.00 456.00 5.00 444868 NMB 2018 05 03 13 50 00 3745-99 P n2o CCGG 330.520 0.430 ... H4 2018 06 08 12 29 00 -23.5800 15.0300 461.00 456.00 5.00 444869 NMB 2018 05 10 16 28 00 2482-99 P n2o CCGG 332.280 0.430 ... H4 2018 06 13 09 57 00 -23.5800 15.0300 461.00 456.00 5.00 444865 NMB 2018 05 17 13 41 00 1363-99 P n2o CCGG 331.380 0.430 ... H4 2018 06 12 12 43 00 -23.5800 15.0300 461.00 456.00 5.00 444910 NMB 2018 05 17 13 41 00 945-99 P n2o CCGG 331.620 0.430 ... H4 2018 06 12 12 27 00 -23.5800 15.0300 461.00 456.00 5.00 444911 NMB 2018 05 23 14 05 00 1766-99 P n2o CCGG 331.370 0.430 ... H4 2018 06 08 11 57 00 -23.5800 15.0300 461.00 456.00 5.00 444867 NMB 2018 05 23 14 05 00 288-99 P n2o CCGG 331.550 0.430 ... H4 2018 06 08 11 41 00 -23.5800 15.0300 461.00 456.00 5.00 444866 NMB 2018 05 30 14 09 00 1256-99 P n2o CCGG 332.530 0.429 N.. H4 2018 08 20 12 28 00 -23.5800 15.0300 461.00 456.00 5.00 447635 NMB 2018 05 30 14 09 00 4525-99 P n2o CCGG 334.120 0.429 N.. H4 2018 08 20 12 44 00 -23.5800 15.0300 461.00 456.00 5.00 447636 NMB 2018 06 08 14 06 00 2021-99 P n2o CCGG 330.980 0.429 ... H4 2018 08 20 12 12 00 -23.5800 15.0300 461.00 456.00 5.00 447638 NMB 2018 06 08 14 06 00 258-99 P n2o CCGG 331.050 0.429 ... H4 2018 08 20 11 56 00 -23.5800 15.0300 461.00 456.00 5.00 447637 NMB 2018 06 14 13 50 00 2015-99 P n2o CCGG 331.520 0.429 ... H4 2018 10 15 14 52 00 -23.5800 15.0300 461.00 456.00 5.00 450090 NMB 2018 06 14 13 50 00 5887-99 P n2o CCGG 330.780 0.429 ... H4 2018 10 15 15 08 00 -23.5800 15.0300 461.00 456.00 5.00 450091 NMB 2018 06 20 13 45 00 1916-99 P n2o CCGG 330.850 0.429 ... H4 2018 10 15 15 39 00 -23.5800 15.0300 461.00 456.00 5.00 450088 NMB 2018 06 20 13 45 00 80-99 P n2o CCGG 330.530 0.429 ... H4 2018 10 15 15 24 00 -23.5800 15.0300 461.00 456.00 5.00 450089 NMB 2018 06 29 13 30 00 2955-99 P n2o CCGG 330.920 0.429 ... H4 2018 08 20 15 40 00 -23.5800 15.0300 461.00 456.00 5.00 447649 NMB 2018 06 29 13 30 00 5489-99 P n2o CCGG 331.340 0.429 ... H4 2018 08 20 15 56 00 -23.5800 15.0300 461.00 456.00 5.00 447650 NMB 2018 07 05 13 51 00 5112-99 P n2o CCGG 329.520 0.429 ... H4 2018 08 20 15 08 00 -23.5800 15.0300 461.00 456.00 5.00 447645 NMB 2018 07 05 13 51 00 5895-99 P n2o CCGG 329.550 0.429 ... H4 2018 08 20 15 24 00 -23.5800 15.0300 461.00 456.00 5.00 447646 NMB 2018 07 12 13 50 00 3941-99 P n2o CCGG 330.780 0.429 ... H4 2018 08 20 14 03 00 -23.5800 15.0300 461.00 456.00 5.00 447639 NMB 2018 07 12 13 50 00 5516-99 P n2o CCGG 331.010 0.429 ... H4 2018 08 20 14 19 00 -23.5800 15.0300 461.00 456.00 5.00 447640 NMB 2018 07 19 13 54 00 3544-99 P n2o CCGG 331.940 0.429 A.. H4 2018 08 20 14 51 00 -23.5800 15.0300 461.00 456.00 5.00 447641 NMB 2018 07 19 13 54 00 703-99 P n2o CCGG 330.380 0.429 A.. H4 2018 08 20 14 35 00 -23.5800 15.0300 461.00 456.00 5.00 447642 NMB 2018 07 26 14 02 00 2419-99 P n2o CCGG 330.950 0.429 ... H4 2018 08 20 13 32 00 -23.5800 15.0300 461.00 456.00 5.00 447647 NMB 2018 07 26 14 02 00 5341-99 P n2o CCGG 330.750 0.429 ... H4 2018 08 20 13 47 00 -23.5800 15.0300 461.00 456.00 5.00 447648 NMB 2018 08 02 14 09 00 1374-99 P n2o CCGG 329.570 0.429 ... H4 2018 08 20 13 00 00 -23.5800 15.0300 461.00 456.00 5.00 447643 NMB 2018 08 02 14 09 00 5305-99 P n2o CCGG 330.540 0.429 ... H4 2018 08 20 13 16 00 -23.5800 15.0300 461.00 456.00 5.00 447644 NMB 2018 08 08 14 07 00 1085-99 P n2o CCGG 330.860 0.429 ... H4 2018 10 16 12 46 00 -23.5800 15.0300 461.00 456.00 5.00 450100 NMB 2018 08 08 14 07 00 5601-99 P n2o CCGG 330.730 0.429 ... H4 2018 10 16 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 450101 NMB 2018 08 16 14 06 00 177-99 P n2o CCGG 331.090 0.429 ... H4 2018 10 16 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 450096 NMB 2018 08 16 14 06 00 377-99 P n2o CCGG 331.630 0.429 ... H4 2018 10 16 13 33 00 -23.5800 15.0300 461.00 456.00 5.00 450097 NMB 2018 08 23 14 13 00 5457-99 P n2o CCGG 331.490 0.429 ... H4 2018 10 16 14 36 00 -23.5800 15.0300 461.00 456.00 5.00 450103 NMB 2018 08 23 14 13 00 612-99 P n2o CCGG 330.930 0.429 ... H4 2018 10 16 14 21 00 -23.5800 15.0300 461.00 456.00 5.00 450102 NMB 2018 08 31 15 03 00 2010-99 P n2o CCGG 331.080 0.429 ... H4 2018 10 16 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 450098 NMB 2018 08 31 15 03 00 2139-99 P n2o CCGG 330.560 0.429 ... H4 2018 10 16 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 450099 NMB 2018 09 06 14 09 00 2332-99 P n2o CCGG 330.640 0.429 ... H4 2018 10 16 08 48 00 -23.5800 15.0300 461.00 456.00 5.00 450094 NMB 2018 09 06 14 09 00 522-99 P n2o CCGG 330.140 0.429 ... H4 2018 10 16 08 33 00 -23.5800 15.0300 461.00 456.00 5.00 450095 NMB 2018 09 13 14 01 00 1774-99 P n2o CCGG 331.230 0.429 ... H4 2018 10 16 09 04 00 -23.5800 15.0300 461.00 456.00 5.00 450092 NMB 2018 09 13 14 01 00 2880-99 P n2o CCGG 330.840 0.429 ... H4 2018 10 16 09 20 00 -23.5800 15.0300 461.00 456.00 5.00 450093 NMB 2018 09 20 14 01 00 2122-99 P n2o CCGG 331.280 0.429 ... H4 2018 10 15 13 17 00 -23.5800 15.0300 461.00 456.00 5.00 450106 NMB 2018 09 20 14 01 00 3003-99 P n2o CCGG 331.210 0.429 ... H4 2018 10 15 13 33 00 -23.5800 15.0300 461.00 456.00 5.00 450107 NMB 2018 09 27 13 38 00 3744-99 P n2o CCGG 331.400 0.429 ... H4 2018 10 15 13 49 00 -23.5800 15.0300 461.00 456.00 5.00 450104 NMB 2018 09 27 13 38 00 3758-99 P n2o CCGG 331.110 0.429 ... H4 2018 10 15 14 05 00 -23.5800 15.0300 461.00 456.00 5.00 450105 NMB 2018 10 04 13 28 00 2111-99 P n2o CCGG 332.170 0.429 ... H4 2019 02 05 10 19 00 -23.5800 15.0300 461.00 456.00 5.00 453634 NMB 2018 10 04 13 28 00 4527-99 P n2o CCGG 331.690 0.429 ... H4 2019 02 05 10 35 00 -23.5800 15.0300 461.00 456.00 5.00 453635 NMB 2018 10 11 14 00 00 1008-99 P n2o CCGG 331.630 0.429 ... H4 2019 02 05 09 48 00 -23.5800 15.0300 461.00 456.00 5.00 453632 NMB 2018 10 11 14 00 00 3415-99 P n2o CCGG 331.040 0.429 ... H4 2019 02 05 10 03 00 -23.5800 15.0300 461.00 456.00 5.00 453633 NMB 2018 10 18 14 00 00 1193-99 P n2o CCGG 331.440 0.429 ... H4 2019 01 29 16 13 00 -23.5800 15.0300 461.00 456.00 5.00 453542 NMB 2018 10 18 14 00 00 3228-99 P n2o CCGG 330.230 0.429 ... H4 2019 01 29 16 29 00 -23.5800 15.0300 461.00 456.00 5.00 453543 NMB 2018 10 25 14 10 00 1355-99 P n2o CCGG 330.800 0.429 ... H4 2019 02 05 10 51 00 -23.5800 15.0300 461.00 456.00 5.00 453612 NMB 2018 10 25 14 10 00 5419-99 P n2o CCGG 331.060 0.429 ... H4 2019 02 05 11 07 00 -23.5800 15.0300 461.00 456.00 5.00 453613 NMB 2018 11 01 13 53 00 2271-99 P n2o CCGG 331.990 0.429 ... H4 2019 02 07 10 11 00 -23.5800 15.0300 461.00 456.00 5.00 453494 NMB 2018 11 01 13 53 00 3540-99 P n2o CCGG 331.200 0.429 ... H4 2019 02 07 10 26 00 -23.5800 15.0300 461.00 456.00 5.00 453495 NMB 2018 11 08 14 11 00 2803-99 P n2o CCGG 332.010 0.429 N.. H4 2019 02 05 12 26 00 -23.5800 15.0300 461.00 456.00 5.00 453618 NMB 2018 11 08 14 11 00 3247-99 P n2o CCGG 331.790 0.429 ... H4 2019 02 05 12 41 00 -23.5800 15.0300 461.00 456.00 5.00 453619 NMB 2018 11 15 14 07 00 329-99 P n2o CCGG 330.980 0.429 ... H4 2019 02 07 11 45 00 -23.5800 15.0300 461.00 456.00 5.00 453908 NMB 2018 11 15 14 07 00 5065-99 P n2o CCGG 330.900 0.429 ... H4 2019 02 07 12 01 00 -23.5800 15.0300 461.00 456.00 5.00 453909 NMB 2018 11 22 14 05 00 3519-99 P n2o CCGG 331.370 0.429 ... H4 2019 02 07 11 14 00 -23.5800 15.0300 461.00 456.00 5.00 453496 NMB 2018 11 22 14 05 00 5705-99 P n2o CCGG 331.420 0.429 ... H4 2019 02 07 11 30 00 -23.5800 15.0300 461.00 456.00 5.00 453497 NMB 2018 11 29 14 29 00 4333-99 P n2o CCGG 330.870 0.429 ... H4 2019 02 07 12 17 00 -23.5800 15.0300 461.00 456.00 5.00 453498 NMB 2018 11 29 14 29 00 5887-99 P n2o CCGG 330.900 0.429 ... H4 2019 02 07 12 33 00 -23.5800 15.0300 461.00 456.00 5.00 453499 NMB 2018 12 06 14 00 00 2572-99 P n2o CCGG 330.560 0.429 ... H4 2019 02 05 09 16 00 -23.5800 15.0300 461.00 456.00 5.00 453630 NMB 2018 12 06 14 00 00 5369-99 P n2o CCGG 331.040 0.429 ... H4 2019 02 05 09 32 00 -23.5800 15.0300 461.00 456.00 5.00 453631 NMB 2018 12 14 14 01 00 101-99 P n2o CCGG 331.340 0.429 ... H4 2019 02 05 11 54 00 -23.5800 15.0300 461.00 456.00 5.00 453616 NMB 2018 12 14 14 01 00 507-99 P n2o CCGG 332.080 0.429 ... H4 2019 02 05 12 10 00 -23.5800 15.0300 461.00 456.00 5.00 453617 NMB 2018 12 20 14 09 00 3130-99 P n2o CCGG 330.930 0.429 ... H4 2019 02 05 11 22 00 -23.5800 15.0300 461.00 456.00 5.00 453614 NMB 2018 12 20 14 09 00 3234-99 P n2o CCGG 331.070 0.429 ... H4 2019 02 05 11 38 00 -23.5800 15.0300 461.00 456.00 5.00 453615 NMB 2018 12 27 14 03 00 3822-99 P n2o CCGG 331.580 0.429 ... H4 2019 01 29 15 10 00 -23.5800 15.0300 461.00 456.00 5.00 453544 NMB 2018 12 27 14 03 00 4706-99 P n2o CCGG 331.580 0.429 ... H4 2019 01 29 15 26 00 -23.5800 15.0300 461.00 456.00 5.00 453545 NMB 2019 01 03 13 54 00 1411-99 P n2o CCGG 331.480 0.429 ... H4 2019 01 29 15 42 00 -23.5800 15.0300 461.00 456.00 5.00 453546 NMB 2019 01 03 13 54 00 5450-99 P n2o CCGG 331.810 0.429 ... H4 2019 01 29 15 58 00 -23.5800 15.0300 461.00 456.00 5.00 453547 NMB 2019 01 10 14 49 00 1874-99 P n2o CCGG 331.200 0.429 ... H4 2019 04 03 12 50 00 -23.5800 15.0300 461.00 456.00 5.00 456412 NMB 2019 01 10 14 49 00 5324-99 P n2o CCGG 331.560 0.429 ... H4 2019 04 03 13 06 00 -23.5800 15.0300 461.00 456.00 5.00 456413 NMB 2019 01 17 13 56 00 1740-99 P n2o CCGG 331.340 0.429 ... H4 2019 04 03 12 03 00 -23.5800 15.0300 461.00 456.00 5.00 456410 NMB 2019 01 17 13 56 00 962-99 P n2o CCGG 331.420 0.429 ... H4 2019 04 03 11 47 00 -23.5800 15.0300 461.00 456.00 5.00 456411 NMB 2019 01 24 14 18 00 1742-99 P n2o CCGG 332.320 0.429 ... H4 2019 04 04 15 33 00 -23.5800 15.0300 461.00 456.00 5.00 456464 NMB 2019 01 24 14 18 00 2015-99 P n2o CCGG 332.740 0.429 ... H4 2019 04 04 15 49 00 -23.5800 15.0300 461.00 456.00 5.00 456465 NMB 2019 01 31 14 21 00 2122-99 P n2o CCGG 331.400 0.429 N.. H4 2019 04 04 15 02 00 -23.5800 15.0300 461.00 456.00 5.00 456462 NMB 2019 01 31 14 21 00 3003-99 P n2o CCGG 330.940 0.429 N.. H4 2019 04 04 15 18 00 -23.5800 15.0300 461.00 456.00 5.00 456463 NMB 2019 02 07 14 21 00 3910-99 P n2o CCGG 331.890 0.429 ... H4 2019 04 05 16 10 00 -23.5800 15.0300 461.00 456.00 5.00 456582 NMB 2019 02 07 14 21 00 4183-99 P n2o CCGG 331.190 0.429 ... H4 2019 04 05 16 26 00 -23.5800 15.0300 461.00 456.00 5.00 456583 NMB 2019 02 14 14 11 00 2871-99 P n2o CCGG 331.000 0.429 ... H4 2019 04 05 15 39 00 -23.5800 15.0300 461.00 456.00 5.00 456580 NMB 2019 02 14 14 11 00 4545-99 P n2o CCGG 330.970 0.429 ... H4 2019 04 05 15 54 00 -23.5800 15.0300 461.00 456.00 5.00 456581 NMB 2019 02 21 13 46 00 3535-99 P n2o CCGG 331.730 0.429 ... H4 2019 04 02 16 19 00 -23.5800 15.0300 461.00 456.00 5.00 456418 NMB 2019 02 21 13 46 00 5312-99 P n2o CCGG 332.420 0.429 ... H4 2019 04 02 16 35 00 -23.5800 15.0300 461.00 456.00 5.00 456419 NMB 2019 02 28 14 05 00 3035-99 P n2o CCGG 333.400 0.429 ... H4 2019 04 03 12 18 00 -23.5800 15.0300 461.00 456.00 5.00 456416 NMB 2019 02 28 14 05 00 3632-99 P n2o CCGG 333.180 0.429 ... H4 2019 04 03 12 34 00 -23.5800 15.0300 461.00 456.00 5.00 456417 NMB 2019 03 07 13 59 00 433-99 P n2o CCGG 332.150 0.429 ... H4 2019 04 05 17 13 00 -23.5800 15.0300 461.00 456.00 5.00 456586 NMB 2019 03 07 13 59 00 4964-99 P n2o CCGG 332.900 0.429 ... H4 2019 04 05 17 29 00 -23.5800 15.0300 461.00 456.00 5.00 456587 NMB 2019 03 14 15 25 00 1721-99 P n2o CCGG 331.380 0.429 ... H4 2019 04 05 16 42 00 -23.5800 15.0300 461.00 456.00 5.00 456584 NMB 2019 03 14 15 25 00 4899-99 P n2o CCGG 331.750 0.429 ... H4 2019 04 05 16 58 00 -23.5800 15.0300 461.00 456.00 5.00 456585 NMB 2019 03 21 15 45 00 2875-99 P n2o CCGG 332.990 0.429 ... H4 2019 04 03 13 22 00 -23.5800 15.0300 461.00 456.00 5.00 456414 NMB 2019 03 21 15 45 00 4994-99 P n2o CCGG 333.330 0.429 ... H4 2019 04 03 13 37 00 -23.5800 15.0300 461.00 456.00 5.00 456415 NMB 2019 03 27 14 10 00 2306-99 P n2o CCGG 333.420 0.429 .X. H4 2019 07 19 13 02 00 -23.5800 15.0300 461.00 456.00 5.00 461290 NMB 2019 03 27 14 10 00 5281-99 P n2o CCGG 334.300 0.429 .X. H4 2019 07 19 13 18 00 -23.5800 15.0300 461.00 456.00 5.00 461291 NMB 2019 04 04 14 58 00 580-99 P n2o CCGG 331.420 0.429 ... H4 2019 07 19 13 34 00 -23.5800 15.0300 461.00 456.00 5.00 461288 NMB 2019 04 04 14 58 00 701-99 P n2o CCGG 331.530 0.429 ... H4 2019 07 19 13 50 00 -23.5800 15.0300 461.00 456.00 5.00 461289 NMB 2019 04 11 15 02 00 4800-99 P n2o CCGG 332.210 0.429 ... H4 2019 07 24 14 41 00 -23.5800 15.0300 461.00 456.00 5.00 461301 NMB 2019 04 11 15 02 00 809-99 P n2o CCGG 332.810 0.429 ... H4 2019 07 24 14 25 00 -23.5800 15.0300 461.00 456.00 5.00 461300 NMB 2019 04 18 15 04 00 2068-99 P n2o CCGG 331.710 0.429 ... H4 2019 07 24 13 54 00 -23.5800 15.0300 461.00 456.00 5.00 461302 NMB 2019 04 18 15 04 00 2432-99 P n2o CCGG 331.610 0.429 ... H4 2019 07 24 14 10 00 -23.5800 15.0300 461.00 456.00 5.00 461303 NMB 2019 05 02 15 00 00 1755-99 P n2o CCGG 332.120 0.429 ... H4 2019 07 17 16 37 00 -23.5800 15.0300 461.00 456.00 5.00 461193 NMB 2019 05 02 15 00 00 2384-99 P n2o CCGG 332.130 0.429 ... H4 2019 07 17 16 53 00 -23.5800 15.0300 461.00 456.00 5.00 461194 NMB 2019 05 09 15 09 00 3500-99 P n2o CCGG 331.280 0.429 ... H4 2019 07 17 16 05 00 -23.5800 15.0300 461.00 456.00 5.00 461191 NMB 2019 05 09 15 09 00 3593-99 P n2o CCGG 332.430 0.429 ... H4 2019 07 17 16 21 00 -23.5800 15.0300 461.00 456.00 5.00 461192 NMB 2019 05 16 15 12 00 2174-99 P n2o CCGG 331.970 0.429 ... H4 2019 07 17 15 02 00 -23.5800 15.0300 461.00 456.00 5.00 461189 NMB 2019 05 16 15 12 00 4678-99 P n2o CCGG 330.750 0.429 ... H4 2019 07 17 15 18 00 -23.5800 15.0300 461.00 456.00 5.00 461190 NMB 2019 05 23 15 02 00 4197-99 P n2o CCGG 333.050 0.429 ... H4 2019 07 17 15 49 00 -23.5800 15.0300 461.00 456.00 5.00 461188 NMB 2019 05 23 15 02 00 579-99 P n2o CCGG 332.940 0.429 ... H4 2019 07 17 15 34 00 -23.5800 15.0300 461.00 456.00 5.00 461187 NMB 2019 06 06 17 02 00 1491-99 P n2o CCGG 331.470 0.429 ... H4 2019 07 24 13 22 00 -23.5800 15.0300 461.00 456.00 5.00 461307 NMB 2019 06 06 17 02 00 5540-99 P n2o CCGG 332.030 0.429 ... H4 2019 07 24 13 38 00 -23.5800 15.0300 461.00 456.00 5.00 461306 NMB 2019 06 07 15 00 00 1660-99 P n2o CCGG 331.020 0.157 ... AR2 2019 10 25 15 04 30 -23.5800 15.0300 461.00 456.00 5.00 466225 NMB 2019 06 07 15 00 00 4517-99 P n2o CCGG 331.010 0.157 ... AR2 2019 10 25 15 18 51 -23.5800 15.0300 461.00 456.00 5.00 466226 NMB 2019 06 13 15 07 00 3109-99 P n2o CCGG 331.000 0.429 ... H4 2019 07 24 12 51 00 -23.5800 15.0300 461.00 456.00 5.00 461304 NMB 2019 06 13 15 07 00 3519-99 P n2o CCGG 330.590 0.429 ... H4 2019 07 24 13 06 00 -23.5800 15.0300 461.00 456.00 5.00 461305 NMB 2019 06 20 15 02 00 1386-99 P n2o CCGG 330.770 0.429 ... H4 2019 07 19 12 30 00 -23.5800 15.0300 461.00 456.00 5.00 461284 NMB 2019 06 20 15 02 00 4414-99 P n2o CCGG 331.820 0.429 ... H4 2019 07 19 12 46 00 -23.5800 15.0300 461.00 456.00 5.00 461285 NMB 2019 06 27 15 00 00 4611-99 P n2o CCGG 332.330 0.429 ... H4 2019 07 19 11 59 00 -23.5800 15.0300 461.00 456.00 5.00 461286 NMB 2019 06 27 15 00 00 5375-99 P n2o CCGG 332.010 0.429 ... H4 2019 07 19 12 15 00 -23.5800 15.0300 461.00 456.00 5.00 461287 NMB 2019 07 11 15 09 00 1793-99 P n2o CCGG 334.430 0.157 .X. AR2 2019 10 25 14 35 42 -23.5800 15.0300 461.00 456.00 5.00 466223 NMB 2019 07 11 15 09 00 4376-99 P n2o CCGG 334.460 0.157 .X. AR2 2019 10 25 14 50 08 -23.5800 15.0300 461.00 456.00 5.00 466224 NMB 2019 07 18 14 55 00 3631-99 P n2o CCGG 332.080 0.157 ... AR2 2019 10 28 15 23 49 -23.5800 15.0300 461.00 456.00 5.00 466245 NMB 2019 07 18 14 55 00 4185-99 P n2o CCGG 332.070 0.157 ... AR2 2019 10 28 15 38 06 -23.5800 15.0300 461.00 456.00 5.00 466246 NMB 2019 07 25 14 30 00 3225-99 P n2o CCGG 332.000 0.157 ... AR2 2019 10 28 15 52 25 -23.5800 15.0300 461.00 456.00 5.00 466243 NMB 2019 07 25 14 30 00 3554-99 P n2o CCGG 331.980 0.157 ... AR2 2019 10 28 16 06 45 -23.5800 15.0300 461.00 456.00 5.00 466244 NMB 2019 08 02 15 05 00 2161-99 P n2o CCGG 331.230 0.157 ... AR2 2019 10 29 16 39 06 -23.5800 15.0300 461.00 456.00 5.00 466285 NMB 2019 08 02 15 05 00 5187-99 P n2o CCGG 331.250 0.157 ... AR2 2019 10 29 16 53 25 -23.5800 15.0300 461.00 456.00 5.00 466286 NMB 2019 08 09 15 02 00 225-99 P n2o CCGG 331.350 0.157 ... AR2 2019 10 29 16 10 15 -23.5800 15.0300 461.00 456.00 5.00 466283 NMB 2019 08 09 15 02 00 4976-99 P n2o CCGG 331.330 0.157 ... AR2 2019 10 29 16 24 44 -23.5800 15.0300 461.00 456.00 5.00 466284 NMB 2019 08 15 15 10 00 2123-99 P n2o CCGG 332.280 0.157 ... AR2 2019 10 28 15 09 31 -23.5800 15.0300 461.00 456.00 5.00 466342 NMB 2019 08 15 15 10 00 682-99 P n2o CCGG 332.330 0.157 ... AR2 2019 10 28 14 55 13 -23.5800 15.0300 461.00 456.00 5.00 466341 NMB 2019 08 23 15 00 00 2835-99 P n2o CCGG 331.710 0.157 ... AR2 2019 10 28 14 26 35 -23.5800 15.0300 461.00 456.00 5.00 466339 NMB 2019 08 23 15 00 00 3623-99 P n2o CCGG 331.720 0.157 ... AR2 2019 10 28 14 40 54 -23.5800 15.0300 461.00 456.00 5.00 466340 NMB 2019 08 29 15 16 00 2021-99 P n2o CCGG 331.800 0.157 ... AR2 2019 10 28 13 29 07 -23.5800 15.0300 461.00 456.00 5.00 466337 NMB 2019 08 29 15 16 00 5094-99 P n2o CCGG 331.790 0.157 ... AR2 2019 10 28 13 43 28 -23.5800 15.0300 461.00 456.00 5.00 466338 NMB 2019 09 06 15 09 00 1526-99 P n2o CCGG 332.210 0.157 ... AR2 2019 10 28 13 57 52 -23.5800 15.0300 461.00 456.00 5.00 466335 NMB 2019 09 06 15 09 00 2531-99 P n2o CCGG 332.170 0.157 ... AR2 2019 10 28 14 12 12 -23.5800 15.0300 461.00 456.00 5.00 466336 NMB 2019 09 13 15 06 00 3240-99 P n2o CCGG 331.730 0.157 ... AR2 2019 10 29 13 46 55 -23.5800 15.0300 461.00 456.00 5.00 466247 NMB 2019 09 13 15 06 00 3614-99 P n2o CCGG 331.690 0.157 ... AR2 2019 10 29 14 01 16 -23.5800 15.0300 461.00 456.00 5.00 466248 NMB 2019 09 19 14 57 00 2479-99 P n2o CCGG 332.380 0.157 ... AR2 2019 10 28 16 21 09 -23.5800 15.0300 461.00 456.00 5.00 466249 NMB 2019 09 19 14 57 00 5262-99 P n2o CCGG 332.380 0.157 ... AR2 2019 10 28 16 35 29 -23.5800 15.0300 461.00 456.00 5.00 466250 NMB 2019 09 26 15 02 00 1470-99 P n2o CCGG 331.990 0.157 ... AR2 2020 03 04 16 11 41 -23.5800 15.0300 461.00 456.00 5.00 471224 NMB 2019 09 26 15 02 00 3827-99 P n2o CCGG 331.930 0.157 ... AR2 2020 03 04 16 26 01 -23.5800 15.0300 461.00 456.00 5.00 471225 NMB 2019 10 10 14 58 00 2321-99 P n2o CCGG 332.750 0.157 ... AR2 2020 03 03 09 52 44 -23.5800 15.0300 461.00 456.00 5.00 471488 NMB 2019 10 10 14 58 00 2782-99 P n2o CCGG 332.740 0.157 ... AR2 2020 03 03 10 07 07 -23.5800 15.0300 461.00 456.00 5.00 471489 NMB 2019 10 24 15 10 00 1951-99 P n2o CCGG 331.820 0.157 ... AR2 2020 03 03 10 21 29 -23.5800 15.0300 461.00 456.00 5.00 471486 NMB 2019 10 24 15 10 00 4046-99 P n2o CCGG 331.780 0.157 ... AR2 2020 03 03 10 35 54 -23.5800 15.0300 461.00 456.00 5.00 471487 NMB 2019 10 31 15 02 00 1419-99 P n2o CCGG 332.420 0.157 ... AR2 2020 07 10 14 08 53 -23.5800 15.0300 461.00 456.00 5.00 477089 NMB 2019 10 31 15 02 00 4055-99 P n2o CCGG 332.390 0.157 ... AR2 2020 07 10 14 23 15 -23.5800 15.0300 461.00 456.00 5.00 477090 NMB 2019 11 07 15 00 00 4171-99 P n2o CCGG 331.560 0.157 ... AR2 2020 07 10 14 37 36 -23.5800 15.0300 461.00 456.00 5.00 477091 NMB 2019 11 07 15 00 00 5112-99 P n2o CCGG 331.530 0.157 ... AR2 2020 07 10 14 51 51 -23.5800 15.0300 461.00 456.00 5.00 477092 NMB 2019 11 14 15 15 00 4673-99 P n2o CCGG 332.090 0.157 ... AR2 2020 03 03 13 13 41 -23.5800 15.0300 461.00 456.00 5.00 471446 NMB 2019 11 14 15 15 00 5010-99 P n2o CCGG 332.020 0.157 ... AR2 2020 03 03 13 28 03 -23.5800 15.0300 461.00 456.00 5.00 471447 NMB 2019 11 21 15 02 00 3088-99 P n2o CCGG 332.060 0.157 ... AR2 2020 03 03 14 25 30 -23.5800 15.0300 461.00 456.00 5.00 471449 NMB 2019 11 21 15 02 00 584-99 P n2o CCGG 332.020 0.157 ... AR2 2020 03 03 14 11 08 -23.5800 15.0300 461.00 456.00 5.00 471448 NMB 2019 11 28 17 07 00 1299-99 P n2o CCGG 332.040 0.157 ... AR2 2020 03 03 16 34 35 -23.5800 15.0300 461.00 456.00 5.00 471528 NMB 2019 11 28 17 07 00 2130-99 P n2o CCGG 332.000 0.157 ... AR2 2020 03 03 16 48 57 -23.5800 15.0300 461.00 456.00 5.00 471529 NMB 2019 12 03 15 01 00 4319-99 P n2o CCGG 331.860 0.157 ... AR2 2020 03 04 16 40 21 -23.5800 15.0300 461.00 456.00 5.00 471222 NMB 2019 12 03 15 01 00 4978-99 P n2o CCGG 331.830 0.157 ... AR2 2020 03 04 16 54 40 -23.5800 15.0300 461.00 456.00 5.00 471223 NMB 2019 12 05 15 10 00 1244-99 P n2o CCGG 332.160 0.157 ... AR2 2020 03 03 17 03 20 -23.5800 15.0300 461.00 456.00 5.00 471526 NMB 2019 12 05 15 10 00 1456-99 P n2o CCGG 332.160 0.157 ... AR2 2020 03 03 17 17 42 -23.5800 15.0300 461.00 456.00 5.00 471527 NMB 2019 12 12 14 58 00 1104-99 P n2o CCGG 332.180 0.157 ... AR2 2020 03 03 15 08 35 -23.5800 15.0300 461.00 456.00 5.00 471452 NMB 2019 12 12 14 58 00 3585-99 P n2o CCGG 332.210 0.157 ... AR2 2020 03 03 15 22 55 -23.5800 15.0300 461.00 456.00 5.00 471453 NMB 2019 12 19 15 00 00 151-99 P n2o CCGG 331.850 0.157 ... AR2 2020 03 03 14 39 53 -23.5800 15.0300 461.00 456.00 5.00 471450 NMB 2019 12 19 15 00 00 908-99 P n2o CCGG 331.820 0.157 ... AR2 2020 03 03 14 54 14 -23.5800 15.0300 461.00 456.00 5.00 471451 NMB 2019 12 26 15 03 00 2447-99 P n2o CCGG 332.290 0.157 ... AR2 2020 03 10 17 06 29 -23.5800 15.0300 461.00 456.00 5.00 471502 NMB 2019 12 26 15 03 00 3123-99 P n2o CCGG 332.270 0.157 ... AR2 2020 03 10 17 20 49 -23.5800 15.0300 461.00 456.00 5.00 471503