# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2011 02 01 00 09 55 31.3200 -97.3300 251.000 457.0 126.339 3.090 -999.990 -999.990 1.263 ..P WKT 2011 02 01 00 10 25 31.3200 -97.3300 251.000 457.0 121.772 3.280 -999.990 -999.990 1.218 ..P WKT 2011 02 01 00 10 55 31.3200 -97.3300 251.000 457.0 127.444 2.620 -999.990 -999.990 1.274 ..P WKT 2011 02 01 00 11 25 31.3200 -97.3300 251.000 457.0 128.728 3.570 -999.990 -999.990 1.287 ..P WKT 2011 02 01 00 11 55 31.3200 -97.3300 251.000 457.0 125.491 4.510 -999.990 -999.990 1.255 ..P WKT 2011 02 01 00 12 25 31.3200 -97.3300 251.000 457.0 126.508 3.040 -999.990 -999.990 1.265 ..P WKT 2011 02 01 00 12 55 31.3200 -97.3300 251.000 457.0 128.590 2.700 -999.990 -999.990 1.286 ..P WKT 2011 02 01 00 13 25 31.3200 -97.3300 251.000 457.0 132.002 3.380 -999.990 -999.990 1.320 ..P WKT 2011 02 01 00 13 55 31.3200 -97.3300 251.000 457.0 124.243 3.880 -999.990 -999.990 1.242 ..P WKT 2011 02 01 00 14 25 31.3200 -97.3300 251.000 457.0 127.787 3.410 -999.990 -999.990 1.278 ..P WKT 2011 02 01 00 14 55 31.3200 -97.3300 251.000 457.0 126.943 3.410 -999.990 -999.990 1.269 ..P WKT 2011 02 01 00 19 55 31.3200 -97.3300 251.000 30.0 157.339 3.100 -999.990 -999.990 1.573 ..P WKT 2011 02 01 00 24 55 31.3200 -97.3300 251.000 122.0 146.375 4.330 -999.990 -999.990 1.464 ..P WKT 2011 02 01 00 29 55 31.3200 -97.3300 251.000 457.0 126.098 3.490 -999.990 -999.990 1.261 ..P WKT 2011 02 01 00 34 55 31.3200 -97.3300 251.000 30.0 149.716 3.820 -999.990 -999.990 1.497 ..P WKT 2011 02 01 00 39 55 31.3200 -97.3300 251.000 122.0 128.638 4.080 -999.990 -999.990 1.286 ..P WKT 2011 02 01 00 44 55 31.3200 -97.3300 251.000 457.0 123.389 3.410 -999.990 -999.990 1.234 ..P WKT 2011 02 01 00 54 55 31.3200 -97.3300 251.000 30.0 156.824 4.140 -999.990 -999.990 1.568 ..P WKT 2011 02 01 00 59 55 31.3200 -97.3300 251.000 122.0 128.847 3.530 -999.990 -999.990 1.288 ..P WKT 2011 02 01 01 04 55 31.3200 -97.3300 251.000 457.0 119.764 3.670 -999.990 -999.990 1.198 ..P WKT 2011 02 01 01 09 55 31.3200 -97.3300 251.000 30.0 141.687 4.340 -999.990 -999.990 1.417 ..P WKT 2011 02 01 01 14 55 31.3200 -97.3300 251.000 122.0 125.149 3.900 -999.990 -999.990 1.251 ..P WKT 2011 02 01 01 19 55 31.3200 -97.3300 251.000 457.0 124.050 4.350 -999.990 -999.990 1.240 ..P WKT 2011 02 01 01 29 55 31.3200 -97.3300 251.000 30.0 149.558 4.110 -999.990 -999.990 1.496 ..P WKT 2011 02 01 01 34 55 31.3200 -97.3300 251.000 122.0 121.054 4.360 -999.990 -999.990 1.211 ..P WKT 2011 02 01 01 39 55 31.3200 -97.3300 251.000 457.0 117.310 4.030 -999.990 -999.990 1.173 ..P WKT 2011 02 01 01 44 55 31.3200 -97.3300 251.000 30.0 146.852 4.130 -999.990 -999.990 1.469 ..P WKT 2011 02 01 01 49 55 31.3200 -97.3300 251.000 122.0 122.603 4.020 -999.990 -999.990 1.226 ..P WKT 2011 02 01 01 54 55 31.3200 -97.3300 251.000 457.0 122.055 4.000 -999.990 -999.990 1.221 ..P WKT 2011 02 01 02 04 55 31.3200 -97.3300 251.000 30.0 147.060 4.800 -999.990 -999.990 1.471 ..P WKT 2011 02 01 02 09 55 31.3200 -97.3300 251.000 122.0 137.456 4.000 -999.990 -999.990 1.375 ..P WKT 2011 02 01 02 14 55 31.3200 -97.3300 251.000 457.0 124.121 3.900 -999.990 -999.990 1.241 ..P WKT 2011 02 01 02 19 55 31.3200 -97.3300 251.000 30.0 153.677 4.200 -999.990 -999.990 1.537 ..P WKT 2011 02 01 02 24 55 31.3200 -97.3300 251.000 122.0 170.715 4.520 -999.990 -999.990 1.707 ..P WKT 2011 02 01 02 29 55 31.3200 -97.3300 251.000 457.0 123.007 3.800 -999.990 -999.990 1.230 ..P WKT 2011 02 01 02 39 55 31.3200 -97.3300 251.000 30.0 165.955 4.020 -999.990 -999.990 1.660 ..P WKT 2011 02 01 02 44 55 31.3200 -97.3300 251.000 122.0 156.957 3.620 -999.990 -999.990 1.570 ..P WKT 2011 02 01 02 49 55 31.3200 -97.3300 251.000 457.0 131.433 4.520 -999.990 -999.990 1.314 ..P WKT 2011 02 01 02 54 55 31.3200 -97.3300 251.000 30.0 169.876 3.910 -999.990 -999.990 1.699 ..P WKT 2011 02 01 02 59 55 31.3200 -97.3300 251.000 122.0 143.550 4.670 -999.990 -999.990 1.436 ..P WKT 2011 02 01 03 04 55 31.3200 -97.3300 251.000 457.0 128.949 3.520 -999.990 -999.990 1.289 ..P WKT 2011 02 01 03 14 55 31.3200 -97.3300 251.000 30.0 168.205 3.550 -999.990 -999.990 1.682 ..P WKT 2011 02 01 03 19 55 31.3200 -97.3300 251.000 122.0 156.479 4.310 -999.990 -999.990 1.565 ..P WKT 2011 02 01 03 24 55 31.3200 -97.3300 251.000 457.0 128.619 3.830 -999.990 -999.990 1.286 ..P WKT 2011 02 01 03 29 55 31.3200 -97.3300 251.000 30.0 161.422 4.210 -999.990 -999.990 1.614 ..P WKT 2011 02 01 03 34 55 31.3200 -97.3300 251.000 122.0 160.361 4.720 -999.990 -999.990 1.604 ..P WKT 2011 02 01 03 39 55 31.3200 -97.3300 251.000 457.0 131.029 4.990 -999.990 -999.990 1.310 ..P WKT 2011 02 01 03 49 55 31.3200 -97.3300 251.000 30.0 158.529 5.140 -999.990 -999.990 1.585 ..P WKT 2011 02 01 03 54 55 31.3200 -97.3300 251.000 122.0 156.686 4.730 -999.990 -999.990 1.567 ..P WKT 2011 02 01 03 59 55 31.3200 -97.3300 251.000 457.0 125.231 4.980 -999.990 -999.990 1.252 ..P WKT 2011 02 01 04 04 55 31.3200 -97.3300 251.000 30.0 154.066 6.690 -999.990 -999.990 1.541 ..P WKT 2011 02 01 04 09 55 31.3200 -97.3300 251.000 122.0 149.288 5.380 -999.990 -999.990 1.493 ..P WKT 2011 02 01 04 14 55 31.3200 -97.3300 251.000 457.0 121.162 4.280 -999.990 -999.990 1.212 ..P WKT 2011 02 01 04 24 55 31.3200 -97.3300 251.000 30.0 137.713 4.410 -999.990 -999.990 1.377 ..P WKT 2011 02 01 04 29 55 31.3200 -97.3300 251.000 122.0 138.365 5.540 -999.990 -999.990 1.384 ..P WKT 2011 02 01 04 34 55 31.3200 -97.3300 251.000 457.0 126.073 6.870 -999.990 -999.990 1.261 ..P WKT 2011 02 01 04 39 55 31.3200 -97.3300 251.000 30.0 147.677 6.340 -999.990 -999.990 1.477 ..P WKT 2011 02 01 04 44 55 31.3200 -97.3300 251.000 122.0 133.915 4.480 -999.990 -999.990 1.339 ..P WKT 2011 02 01 04 49 55 31.3200 -97.3300 251.000 457.0 130.429 4.370 -999.990 -999.990 1.304 ..P WKT 2011 02 01 05 04 55 31.3200 -97.3300 251.000 30.0 143.399 4.410 -999.990 -999.990 1.434 ..P WKT 2011 02 01 05 09 55 31.3200 -97.3300 251.000 122.0 127.330 4.670 -999.990 -999.990 1.273 ..P WKT 2011 02 01 05 14 55 31.3200 -97.3300 251.000 457.0 118.202 4.700 -999.990 -999.990 1.182 ..P WKT 2011 02 01 05 19 55 31.3200 -97.3300 251.000 30.0 134.575 4.490 -999.990 -999.990 1.346 ..P WKT 2011 02 01 05 24 55 31.3200 -97.3300 251.000 122.0 137.464 4.180 -999.990 -999.990 1.375 ..P WKT 2011 02 01 05 29 55 31.3200 -97.3300 251.000 457.0 127.667 4.240 -999.990 -999.990 1.277 ..P WKT 2011 02 01 05 39 55 31.3200 -97.3300 251.000 30.0 127.888 4.960 -999.990 -999.990 1.279 ..P WKT 2011 02 01 05 44 55 31.3200 -97.3300 251.000 122.0 133.368 5.480 -999.990 -999.990 1.334 ..P WKT 2011 02 01 05 49 55 31.3200 -97.3300 251.000 457.0 121.484 5.130 -999.990 -999.990 1.215 ..P WKT 2011 02 01 05 54 55 31.3200 -97.3300 251.000 30.0 131.773 4.010 -999.990 -999.990 1.318 ..P WKT 2011 02 01 05 59 55 31.3200 -97.3300 251.000 122.0 130.306 4.150 -999.990 -999.990 1.303 ..P WKT 2011 02 01 06 04 55 31.3200 -97.3300 251.000 457.0 122.695 4.180 -999.990 -999.990 1.227 ..P WKT 2011 02 01 06 14 55 31.3200 -97.3300 251.000 30.0 130.183 4.130 -999.990 -999.990 1.302 ..P WKT 2011 02 01 06 19 55 31.3200 -97.3300 251.000 122.0 134.062 4.270 -999.990 -999.990 1.341 ..P WKT 2011 02 01 06 24 55 31.3200 -97.3300 251.000 457.0 121.370 4.460 -999.990 -999.990 1.214 ..P WKT 2011 02 01 06 29 55 31.3200 -97.3300 251.000 30.0 130.861 4.570 -999.990 -999.990 1.309 ..P WKT 2011 02 01 06 34 55 31.3200 -97.3300 251.000 122.0 127.524 4.420 -999.990 -999.990 1.275 ..P WKT 2011 02 01 06 39 55 31.3200 -97.3300 251.000 457.0 127.928 5.080 -999.990 -999.990 1.279 ..P WKT 2011 02 01 06 49 55 31.3200 -97.3300 251.000 30.0 131.945 4.300 -999.990 -999.990 1.319 ..P WKT 2011 02 01 06 54 55 31.3200 -97.3300 251.000 122.0 131.280 4.380 -999.990 -999.990 1.313 ..P WKT 2011 02 01 06 59 55 31.3200 -97.3300 251.000 457.0 123.931 4.570 -999.990 -999.990 1.239 ..P WKT 2011 02 01 07 04 55 31.3200 -97.3300 251.000 30.0 132.090 4.740 -999.990 -999.990 1.321 ..P WKT 2011 02 01 07 09 55 31.3200 -97.3300 251.000 122.0 130.890 5.430 -999.990 -999.990 1.309 ..P WKT 2011 02 01 07 14 55 31.3200 -97.3300 251.000 457.0 118.992 5.400 -999.990 -999.990 1.190 ..P WKT 2011 02 01 07 24 55 31.3200 -97.3300 251.000 30.0 123.354 5.170 -999.990 -999.990 1.234 ..P WKT 2011 02 01 07 29 55 31.3200 -97.3300 251.000 122.0 126.910 4.710 -999.990 -999.990 1.269 ..P WKT 2011 02 01 07 34 55 31.3200 -97.3300 251.000 457.0 125.653 4.800 -999.990 -999.990 1.257 ..P WKT 2011 02 01 07 39 55 31.3200 -97.3300 251.000 30.0 122.923 4.800 -999.990 -999.990 1.229 ..P WKT 2011 02 01 07 44 55 31.3200 -97.3300 251.000 122.0 125.544 5.280 -999.990 -999.990 1.255 ..P WKT 2011 02 01 07 49 55 31.3200 -97.3300 251.000 457.0 126.828 5.000 -999.990 -999.990 1.268 ..P WKT 2011 02 01 07 59 55 31.3200 -97.3300 251.000 30.0 193.006 5.080 -999.990 -999.990 1.930 ..P WKT 2011 02 01 08 04 55 31.3200 -97.3300 251.000 122.0 176.556 5.700 -999.990 -999.990 1.766 ..P WKT 2011 02 01 08 09 55 31.3200 -97.3300 251.000 457.0 137.757 5.830 -999.990 -999.990 1.378 ..P WKT 2011 02 01 08 14 55 31.3200 -97.3300 251.000 30.0 162.517 7.010 -999.990 -999.990 1.625 ..P WKT 2011 02 01 08 19 55 31.3200 -97.3300 251.000 122.0 165.065 6.200 -999.990 -999.990 1.651 ..P WKT 2011 02 01 08 24 55 31.3200 -97.3300 251.000 457.0 153.963 5.930 -999.990 -999.990 1.540 ..P WKT 2011 02 01 08 34 55 31.3200 -97.3300 251.000 30.0 164.605 5.930 -999.990 -999.990 1.646 ..P WKT 2011 02 01 08 39 55 31.3200 -97.3300 251.000 122.0 163.195 6.320 -999.990 -999.990 1.632 ..P WKT 2011 02 01 08 44 55 31.3200 -97.3300 251.000 457.0 144.918 7.380 -999.990 -999.990 1.449 ..P WKT 2011 02 01 08 49 55 31.3200 -97.3300 251.000 30.0 170.550 6.920 -999.990 -999.990 1.706 ..P WKT 2011 02 01 08 54 55 31.3200 -97.3300 251.000 122.0 164.053 6.350 -999.990 -999.990 1.641 ..P WKT 2011 02 01 08 59 55 31.3200 -97.3300 251.000 457.0 161.304 5.430 -999.990 -999.990 1.613 ..P WKT 2011 02 01 09 09 55 31.3200 -97.3300 251.000 30.0 161.583 5.500 -999.990 -999.990 1.616 ..P WKT 2011 02 01 09 14 55 31.3200 -97.3300 251.000 122.0 160.594 6.580 -999.990 -999.990 1.606 ..P WKT 2011 02 01 09 19 55 31.3200 -97.3300 251.000 457.0 158.532 6.990 -999.990 -999.990 1.585 ..P WKT 2011 02 01 09 24 55 31.3200 -97.3300 251.000 30.0 160.221 6.490 -999.990 -999.990 1.602 ..P WKT 2011 02 01 09 29 55 31.3200 -97.3300 251.000 122.0 169.947 5.660 -999.990 -999.990 1.699 ..P WKT 2011 02 01 09 34 55 31.3200 -97.3300 251.000 457.0 170.833 5.570 -999.990 -999.990 1.708 ..P WKT 2011 02 01 09 44 55 31.3200 -97.3300 251.000 30.0 166.654 5.420 -999.990 -999.990 1.667 ..P WKT 2011 02 01 09 49 55 31.3200 -97.3300 251.000 122.0 168.555 5.510 -999.990 -999.990 1.686 ..P WKT 2011 02 01 09 54 55 31.3200 -97.3300 251.000 457.0 169.384 5.680 -999.990 -999.990 1.694 ..P WKT 2011 02 01 09 59 55 31.3200 -97.3300 251.000 30.0 173.697 5.980 -999.990 -999.990 1.737 ..P WKT 2011 02 01 10 04 55 31.3200 -97.3300 251.000 122.0 167.826 5.440 -999.990 -999.990 1.678 ..P WKT 2011 02 01 10 09 55 31.3200 -97.3300 251.000 457.0 171.067 5.840 -999.990 -999.990 1.711 ..P WKT 2011 02 01 10 19 55 31.3200 -97.3300 251.000 30.0 168.322 5.620 -999.990 -999.990 1.683 ..P WKT 2011 02 01 10 24 55 31.3200 -97.3300 251.000 122.0 164.211 6.620 -999.990 -999.990 1.642 ..P WKT 2011 02 01 10 29 55 31.3200 -97.3300 251.000 457.0 161.440 5.730 -999.990 -999.990 1.614 ..P WKT 2011 02 01 10 34 55 31.3200 -97.3300 251.000 30.0 161.082 5.800 -999.990 -999.990 1.611 ..P WKT 2011 02 01 10 39 55 31.3200 -97.3300 251.000 122.0 165.550 5.910 -999.990 -999.990 1.656 ..P WKT 2011 02 01 10 44 55 31.3200 -97.3300 251.000 457.0 161.437 6.450 -999.990 -999.990 1.614 ..P WKT 2011 02 01 10 54 55 31.3200 -97.3300 251.000 30.0 168.862 6.330 -999.990 -999.990 1.689 ..P WKT 2011 02 01 10 59 55 31.3200 -97.3300 251.000 122.0 163.772 6.180 -999.990 -999.990 1.638 ..P WKT 2011 02 01 11 04 55 31.3200 -97.3300 251.000 457.0 163.509 6.190 -999.990 -999.990 1.635 ..P WKT 2011 02 01 11 09 55 31.3200 -97.3300 251.000 30.0 156.809 7.390 -999.990 -999.990 1.568 ..P WKT 2011 02 01 11 14 55 31.3200 -97.3300 251.000 122.0 157.083 5.980 -999.990 -999.990 1.571 ..P WKT 2011 02 01 11 19 55 31.3200 -97.3300 251.000 457.0 162.989 6.180 -999.990 -999.990 1.630 ..P WKT 2011 02 01 11 29 55 31.3200 -97.3300 251.000 30.0 162.244 7.050 -999.990 -999.990 1.622 ..P WKT 2011 02 01 11 34 55 31.3200 -97.3300 251.000 122.0 161.223 5.940 -999.990 -999.990 1.612 ..P WKT 2011 02 01 11 39 55 31.3200 -97.3300 251.000 457.0 166.106 6.170 -999.990 -999.990 1.661 ..P WKT 2011 02 01 11 44 55 31.3200 -97.3300 251.000 30.0 155.159 5.960 -999.990 -999.990 1.552 ..P WKT 2011 02 01 11 49 55 31.3200 -97.3300 251.000 122.0 159.237 6.240 -999.990 -999.990 1.592 ..P WKT 2011 02 01 12 09 55 31.3200 -97.3300 251.000 457.0 144.601 5.750 -999.990 -999.990 1.446 ..P WKT 2011 02 01 12 10 25 31.3200 -97.3300 251.000 457.0 151.744 7.070 -999.990 -999.990 1.517 ..P WKT 2011 02 01 12 10 55 31.3200 -97.3300 251.000 457.0 150.703 6.220 -999.990 -999.990 1.507 ..P WKT 2011 02 01 12 11 25 31.3200 -97.3300 251.000 457.0 147.918 5.790 -999.990 -999.990 1.479 ..P WKT 2011 02 01 12 11 55 31.3200 -97.3300 251.000 457.0 147.415 5.990 -999.990 -999.990 1.474 ..P WKT 2011 02 01 12 12 25 31.3200 -97.3300 251.000 457.0 147.581 5.900 -999.990 -999.990 1.476 ..P WKT 2011 02 01 12 12 55 31.3200 -97.3300 251.000 457.0 143.456 6.610 -999.990 -999.990 1.435 ..P WKT 2011 02 01 12 13 25 31.3200 -97.3300 251.000 457.0 141.745 5.840 -999.990 -999.990 1.417 ..P WKT 2011 02 01 12 13 55 31.3200 -97.3300 251.000 457.0 145.533 5.800 -999.990 -999.990 1.455 ..P WKT 2011 02 01 12 14 25 31.3200 -97.3300 251.000 457.0 144.761 5.780 -999.990 -999.990 1.448 ..P WKT 2011 02 01 12 14 55 31.3200 -97.3300 251.000 457.0 147.744 5.780 -999.990 -999.990 1.477 ..P WKT 2011 02 01 12 19 55 31.3200 -97.3300 251.000 30.0 155.043 5.850 -999.990 -999.990 1.550 ..P WKT 2011 02 01 12 24 55 31.3200 -97.3300 251.000 122.0 149.735 5.830 -999.990 -999.990 1.497 ..P WKT 2011 02 01 12 29 55 31.3200 -97.3300 251.000 457.0 152.741 5.860 -999.990 -999.990 1.527 ..P WKT 2011 02 01 12 34 55 31.3200 -97.3300 251.000 30.0 158.025 6.380 -999.990 -999.990 1.580 ..P WKT 2011 02 01 12 39 55 31.3200 -97.3300 251.000 122.0 162.369 5.630 -999.990 -999.990 1.624 ..P WKT 2011 02 01 12 44 55 31.3200 -97.3300 251.000 457.0 157.601 5.740 -999.990 -999.990 1.576 ..P WKT 2011 02 01 12 54 55 31.3200 -97.3300 251.000 30.0 164.235 5.820 -999.990 -999.990 1.642 ..P WKT 2011 02 01 12 59 55 31.3200 -97.3300 251.000 122.0 159.561 6.080 -999.990 -999.990 1.596 ..P WKT 2011 02 01 13 04 55 31.3200 -97.3300 251.000 457.0 151.408 7.060 -999.990 -999.990 1.514 ..P WKT 2011 02 01 13 09 55 31.3200 -97.3300 251.000 30.0 157.583 6.350 -999.990 -999.990 1.576 ..P WKT 2011 02 01 13 14 55 31.3200 -97.3300 251.000 122.0 157.598 5.980 -999.990 -999.990 1.576 ..P WKT 2011 02 01 13 19 55 31.3200 -97.3300 251.000 457.0 157.346 5.790 -999.990 -999.990 1.573 ..P WKT 2011 02 01 13 29 55 31.3200 -97.3300 251.000 30.0 157.892 6.690 -999.990 -999.990 1.579 ..P WKT 2011 02 01 13 34 55 31.3200 -97.3300 251.000 122.0 154.410 5.580 -999.990 -999.990 1.544 ..P WKT 2011 02 01 13 39 55 31.3200 -97.3300 251.000 457.0 152.801 5.940 -999.990 -999.990 1.528 ..P WKT 2011 02 01 13 44 55 31.3200 -97.3300 251.000 30.0 155.741 5.600 -999.990 -999.990 1.557 ..P WKT 2011 02 01 13 49 55 31.3200 -97.3300 251.000 122.0 160.819 5.810 -999.990 -999.990 1.608 ..P WKT 2011 02 01 13 54 55 31.3200 -97.3300 251.000 457.0 152.256 5.390 -999.990 -999.990 1.523 ..P WKT 2011 02 01 14 04 55 31.3200 -97.3300 251.000 30.0 155.153 5.630 -999.990 -999.990 1.552 ..P WKT 2011 02 01 14 09 55 31.3200 -97.3300 251.000 122.0 151.904 5.420 -999.990 -999.990 1.519 ..P WKT 2011 02 01 14 14 55 31.3200 -97.3300 251.000 457.0 153.466 5.680 -999.990 -999.990 1.535 ..P WKT 2011 02 01 14 19 55 31.3200 -97.3300 251.000 30.0 152.355 5.940 -999.990 -999.990 1.524 ..P WKT 2011 02 01 14 24 55 31.3200 -97.3300 251.000 122.0 148.039 6.880 -999.990 -999.990 1.480 ..P WKT 2011 02 01 14 29 55 31.3200 -97.3300 251.000 457.0 148.266 5.460 -999.990 -999.990 1.483 ..P WKT 2011 02 01 14 39 55 31.3200 -97.3300 251.000 30.0 152.763 6.220 -999.990 -999.990 1.528 ..P WKT 2011 02 01 14 44 55 31.3200 -97.3300 251.000 122.0 151.157 5.830 -999.990 -999.990 1.512 ..P WKT 2011 02 01 14 49 55 31.3200 -97.3300 251.000 457.0 151.956 5.610 -999.990 -999.990 1.520 ..P WKT 2011 02 01 14 54 55 31.3200 -97.3300 251.000 30.0 151.152 5.800 -999.990 -999.990 1.512 ..P WKT 2011 02 01 14 59 55 31.3200 -97.3300 251.000 122.0 150.882 5.980 -999.990 -999.990 1.509 ..P WKT 2011 02 01 15 04 55 31.3200 -97.3300 251.000 457.0 148.210 5.940 -999.990 -999.990 1.482 ..P WKT 2011 02 01 15 14 55 31.3200 -97.3300 251.000 30.0 144.966 6.250 -999.990 -999.990 1.450 ..P WKT 2011 02 01 15 19 55 31.3200 -97.3300 251.000 122.0 148.393 5.840 -999.990 -999.990 1.484 ..P WKT 2011 02 01 15 24 55 31.3200 -97.3300 251.000 457.0 147.019 5.610 -999.990 -999.990 1.470 ..P WKT 2011 02 01 15 29 55 31.3200 -97.3300 251.000 30.0 145.112 5.780 -999.990 -999.990 1.451 ..P WKT 2011 02 01 15 34 55 31.3200 -97.3300 251.000 122.0 142.140 6.230 -999.990 -999.990 1.421 ..P WKT 2011 02 01 15 39 55 31.3200 -97.3300 251.000 457.0 146.898 5.310 -999.990 -999.990 1.469 ..P WKT 2011 02 01 15 49 55 31.3200 -97.3300 251.000 30.0 145.466 5.010 -999.990 -999.990 1.455 ..P WKT 2011 02 01 15 54 55 31.3200 -97.3300 251.000 122.0 138.212 5.940 -999.990 -999.990 1.382 ..P WKT 2011 02 01 15 59 55 31.3200 -97.3300 251.000 457.0 143.882 5.410 -999.990 -999.990 1.439 ..P WKT 2011 02 01 16 04 55 31.3200 -97.3300 251.000 30.0 145.022 5.490 -999.990 -999.990 1.450 ..P WKT 2011 02 01 16 09 55 31.3200 -97.3300 251.000 122.0 139.636 5.400 -999.990 -999.990 1.396 ..P WKT 2011 02 01 16 14 55 31.3200 -97.3300 251.000 457.0 149.165 5.790 -999.990 -999.990 1.492 ..P WKT 2011 02 01 16 24 55 31.3200 -97.3300 251.000 30.0 149.654 5.530 -999.990 -999.990 1.497 ..P WKT 2011 02 01 16 29 55 31.3200 -97.3300 251.000 122.0 145.411 5.350 -999.990 -999.990 1.454 ..P WKT 2011 02 01 16 34 55 31.3200 -97.3300 251.000 457.0 150.751 5.380 -999.990 -999.990 1.508 ..P WKT 2011 02 01 16 39 55 31.3200 -97.3300 251.000 30.0 151.831 5.660 -999.990 -999.990 1.518 ..P WKT 2011 02 01 16 44 55 31.3200 -97.3300 251.000 122.0 152.512 5.900 -999.990 -999.990 1.525 ..P WKT 2011 02 01 16 49 55 31.3200 -97.3300 251.000 457.0 141.090 5.900 -999.990 -999.990 1.411 ..P WKT 2011 02 01 17 04 55 31.3200 -97.3300 251.000 30.0 148.051 5.140 -999.990 -999.990 1.481 ..P WKT 2011 02 01 17 09 55 31.3200 -97.3300 251.000 122.0 145.208 5.500 -999.990 -999.990 1.452 ..P WKT 2011 02 01 17 14 55 31.3200 -97.3300 251.000 457.0 149.142 5.000 -999.990 -999.990 1.491 ..P WKT 2011 02 01 17 19 55 31.3200 -97.3300 251.000 30.0 143.775 5.020 -999.990 -999.990 1.438 ..P WKT 2011 02 01 17 24 55 31.3200 -97.3300 251.000 122.0 147.178 4.880 -999.990 -999.990 1.472 ..P WKT 2011 02 01 17 29 55 31.3200 -97.3300 251.000 457.0 151.111 5.390 -999.990 -999.990 1.511 ..P WKT 2011 02 01 17 39 55 31.3200 -97.3300 251.000 30.0 150.145 4.560 -999.990 -999.990 1.501 ..P WKT 2011 02 01 17 44 55 31.3200 -97.3300 251.000 122.0 153.215 4.880 -999.990 -999.990 1.532 ..P WKT 2011 02 01 17 49 55 31.3200 -97.3300 251.000 457.0 155.487 5.010 -999.990 -999.990 1.555 ..P WKT 2011 02 01 17 54 55 31.3200 -97.3300 251.000 30.0 151.123 5.390 -999.990 -999.990 1.511 ..P WKT 2011 02 01 17 59 55 31.3200 -97.3300 251.000 122.0 149.147 4.550 -999.990 -999.990 1.491 ..P WKT 2011 02 01 18 04 55 31.3200 -97.3300 251.000 457.0 149.562 5.210 -999.990 -999.990 1.496 ..P WKT 2011 02 01 18 14 55 31.3200 -97.3300 251.000 30.0 148.572 5.120 -999.990 -999.990 1.486 ..P WKT 2011 02 01 18 19 55 31.3200 -97.3300 251.000 122.0 143.453 4.230 -999.990 -999.990 1.435 ..P WKT 2011 02 01 18 24 55 31.3200 -97.3300 251.000 457.0 148.679 4.270 -999.990 -999.990 1.487 ..P WKT 2011 02 01 18 29 55 31.3200 -97.3300 251.000 30.0 140.646 4.690 -999.990 -999.990 1.406 ..P WKT 2011 02 01 18 34 55 31.3200 -97.3300 251.000 122.0 146.137 4.440 -999.990 -999.990 1.461 ..P WKT 2011 02 01 18 39 55 31.3200 -97.3300 251.000 457.0 142.877 4.930 -999.990 -999.990 1.429 ..P WKT 2011 02 01 18 49 55 31.3200 -97.3300 251.000 30.0 150.995 5.030 -999.990 -999.990 1.510 ..P WKT 2011 02 01 18 54 55 31.3200 -97.3300 251.000 122.0 148.588 4.360 -999.990 -999.990 1.486 ..P WKT 2011 02 01 18 59 55 31.3200 -97.3300 251.000 457.0 150.157 4.330 -999.990 -999.990 1.502 ..P WKT 2011 02 01 19 04 55 31.3200 -97.3300 251.000 30.0 150.665 4.240 -999.990 -999.990 1.507 ..P WKT 2011 02 01 19 09 55 31.3200 -97.3300 251.000 122.0 147.201 4.270 -999.990 -999.990 1.472 ..P WKT 2011 02 01 19 14 55 31.3200 -97.3300 251.000 457.0 147.311 4.910 -999.990 -999.990 1.473 ..P WKT 2011 02 01 19 24 55 31.3200 -97.3300 251.000 30.0 145.303 4.730 -999.990 -999.990 1.453 ..P WKT 2011 02 01 19 29 55 31.3200 -97.3300 251.000 122.0 150.726 4.960 -999.990 -999.990 1.507 ..P WKT 2011 02 01 19 34 55 31.3200 -97.3300 251.000 457.0 146.886 4.230 -999.990 -999.990 1.469 ..P WKT 2011 02 01 19 39 55 31.3200 -97.3300 251.000 30.0 148.339 4.850 -999.990 -999.990 1.483 ..P WKT 2011 02 01 19 44 55 31.3200 -97.3300 251.000 122.0 150.056 4.150 -999.990 -999.990 1.501 ..P WKT 2011 02 01 19 49 55 31.3200 -97.3300 251.000 457.0 148.863 4.670 -999.990 -999.990 1.489 ..P WKT 2011 02 01 19 59 55 31.3200 -97.3300 251.000 30.0 151.692 4.270 -999.990 -999.990 1.517 ..P WKT 2011 02 01 20 04 55 31.3200 -97.3300 251.000 122.0 142.491 3.970 -999.990 -999.990 1.425 ..P WKT 2011 02 01 20 09 55 31.3200 -97.3300 251.000 457.0 142.017 4.550 -999.990 -999.990 1.420 ..P WKT 2011 02 01 20 14 55 31.3200 -97.3300 251.000 30.0 150.795 4.390 -999.990 -999.990 1.508 ..P WKT 2011 02 01 20 19 55 31.3200 -97.3300 251.000 122.0 145.960 3.740 -999.990 -999.990 1.460 ..P WKT 2011 02 01 20 24 55 31.3200 -97.3300 251.000 457.0 148.128 3.720 -999.990 -999.990 1.481 ..P WKT 2011 02 01 20 34 55 31.3200 -97.3300 251.000 30.0 150.086 4.580 -999.990 -999.990 1.501 ..P WKT 2011 02 01 20 39 55 31.3200 -97.3300 251.000 122.0 151.856 3.930 -999.990 -999.990 1.519 ..P WKT 2011 02 01 20 44 55 31.3200 -97.3300 251.000 457.0 153.494 4.010 -999.990 -999.990 1.535 ..P WKT 2011 02 01 20 49 55 31.3200 -97.3300 251.000 30.0 148.927 4.480 -999.990 -999.990 1.489 ..P WKT 2011 02 01 20 54 55 31.3200 -97.3300 251.000 122.0 152.677 4.080 -999.990 -999.990 1.527 ..P WKT 2011 02 01 20 59 55 31.3200 -97.3300 251.000 457.0 147.188 4.330 -999.990 -999.990 1.472 ..P WKT 2011 02 01 21 09 55 31.3200 -97.3300 251.000 30.0 151.989 4.470 -999.990 -999.990 1.520 ..P WKT 2011 02 01 21 14 55 31.3200 -97.3300 251.000 122.0 147.765 3.890 -999.990 -999.990 1.478 ..P WKT 2011 02 01 21 19 55 31.3200 -97.3300 251.000 457.0 149.081 4.440 -999.990 -999.990 1.491 ..P WKT 2011 02 01 21 24 55 31.3200 -97.3300 251.000 30.0 148.815 3.870 -999.990 -999.990 1.488 ..P WKT 2011 02 01 21 29 55 31.3200 -97.3300 251.000 122.0 148.812 3.760 -999.990 -999.990 1.488 ..P WKT 2011 02 01 21 34 55 31.3200 -97.3300 251.000 457.0 153.292 3.720 -999.990 -999.990 1.533 ..P WKT 2011 02 01 21 44 55 31.3200 -97.3300 251.000 30.0 153.210 4.700 -999.990 -999.990 1.532 ..P WKT 2011 02 01 21 49 55 31.3200 -97.3300 251.000 122.0 151.023 3.650 -999.990 -999.990 1.510 ..P WKT 2011 02 01 21 54 55 31.3200 -97.3300 251.000 457.0 150.418 4.170 -999.990 -999.990 1.504 ..P WKT 2011 02 01 21 59 55 31.3200 -97.3300 251.000 30.0 147.442 4.650 -999.990 -999.990 1.474 ..P WKT 2011 02 01 22 04 55 31.3200 -97.3300 251.000 122.0 148.945 4.030 -999.990 -999.990 1.489 ..P WKT 2011 02 01 22 09 55 31.3200 -97.3300 251.000 457.0 143.600 3.740 -999.990 -999.990 1.436 ..P WKT 2011 02 01 22 19 55 31.3200 -97.3300 251.000 30.0 149.389 4.220 -999.990 -999.990 1.494 ..P WKT 2011 02 01 22 24 55 31.3200 -97.3300 251.000 122.0 150.515 4.240 -999.990 -999.990 1.505 ..P WKT 2011 02 01 22 29 55 31.3200 -97.3300 251.000 457.0 153.483 3.840 -999.990 -999.990 1.535 ..P WKT 2011 02 01 22 34 55 31.3200 -97.3300 251.000 30.0 151.186 3.730 -999.990 -999.990 1.512 ..P WKT 2011 02 01 22 39 55 31.3200 -97.3300 251.000 122.0 153.626 3.600 -999.990 -999.990 1.536 ..P WKT 2011 02 01 22 44 55 31.3200 -97.3300 251.000 457.0 154.750 3.750 -999.990 -999.990 1.548 ..P WKT 2011 02 01 22 54 55 31.3200 -97.3300 251.000 30.0 153.766 3.480 -999.990 -999.990 1.538 ..P WKT 2011 02 01 22 59 55 31.3200 -97.3300 251.000 122.0 158.497 4.490 -999.990 -999.990 1.585 ..P WKT 2011 02 01 23 04 55 31.3200 -97.3300 251.000 457.0 153.497 3.310 -999.990 -999.990 1.535 ..P WKT 2011 02 01 23 09 55 31.3200 -97.3300 251.000 30.0 150.602 3.760 -999.990 -999.990 1.506 ..P WKT 2011 02 01 23 14 55 31.3200 -97.3300 251.000 122.0 154.016 3.850 -999.990 -999.990 1.540 ..P WKT 2011 02 01 23 19 55 31.3200 -97.3300 251.000 457.0 156.641 3.120 -999.990 -999.990 1.566 ..P WKT 2011 02 01 23 29 55 31.3200 -97.3300 251.000 30.0 149.441 3.240 -999.990 -999.990 1.494 ..P WKT 2011 02 01 23 34 55 31.3200 -97.3300 251.000 122.0 151.704 3.690 -999.990 -999.990 1.517 ..P WKT 2011 02 01 23 39 55 31.3200 -97.3300 251.000 457.0 149.370 3.310 -999.990 -999.990 1.494 ..P WKT 2011 02 01 23 44 55 31.3200 -97.3300 251.000 30.0 154.916 4.670 -999.990 -999.990 1.549 ..P WKT 2011 02 01 23 49 55 31.3200 -97.3300 251.000 122.0 153.107 3.510 -999.990 -999.990 1.531 ..P WKT 2011 02 02 00 09 55 31.3200 -97.3300 251.000 457.0 155.832 5.380 -999.990 -999.990 1.558 ..P WKT 2011 02 02 00 10 25 31.3200 -97.3300 251.000 457.0 157.576 5.210 -999.990 -999.990 1.576 ..P WKT 2011 02 02 00 10 55 31.3200 -97.3300 251.000 457.0 151.179 3.590 -999.990 -999.990 1.512 ..P WKT 2011 02 02 00 11 25 31.3200 -97.3300 251.000 457.0 156.205 5.760 -999.990 -999.990 1.562 ..P WKT 2011 02 02 00 11 55 31.3200 -97.3300 251.000 457.0 158.737 5.400 -999.990 -999.990 1.587 ..P WKT 2011 02 02 00 12 25 31.3200 -97.3300 251.000 457.0 151.815 3.910 -999.990 -999.990 1.518 ..P WKT 2011 02 02 00 12 55 31.3200 -97.3300 251.000 457.0 158.549 3.700 -999.990 -999.990 1.585 ..P WKT 2011 02 02 00 13 25 31.3200 -97.3300 251.000 457.0 151.757 5.530 -999.990 -999.990 1.518 ..P WKT 2011 02 02 00 13 55 31.3200 -97.3300 251.000 457.0 150.612 4.000 -999.990 -999.990 1.506 ..P WKT 2011 02 02 00 14 25 31.3200 -97.3300 251.000 457.0 154.851 3.690 -999.990 -999.990 1.549 ..P WKT 2011 02 02 00 14 55 31.3200 -97.3300 251.000 457.0 154.494 4.880 -999.990 -999.990 1.545 ..P WKT 2011 02 02 00 19 55 31.3200 -97.3300 251.000 30.0 153.945 4.770 -999.990 -999.990 1.539 ..P WKT 2011 02 02 00 24 55 31.3200 -97.3300 251.000 122.0 147.745 3.920 -999.990 -999.990 1.477 ..P WKT 2011 02 02 00 29 55 31.3200 -97.3300 251.000 457.0 152.713 3.620 -999.990 -999.990 1.527 ..P WKT 2011 02 02 00 34 55 31.3200 -97.3300 251.000 30.0 157.287 3.740 -999.990 -999.990 1.573 ..P WKT 2011 02 02 00 39 55 31.3200 -97.3300 251.000 122.0 154.634 6.440 -999.990 -999.990 1.546 ..P WKT 2011 02 02 00 44 55 31.3200 -97.3300 251.000 457.0 160.789 3.930 -999.990 -999.990 1.608 ..P WKT 2011 02 02 00 54 55 31.3200 -97.3300 251.000 30.0 155.502 3.780 -999.990 -999.990 1.555 ..P WKT 2011 02 02 00 59 55 31.3200 -97.3300 251.000 122.0 154.577 3.710 -999.990 -999.990 1.546 ..P WKT 2011 02 02 01 04 55 31.3200 -97.3300 251.000 457.0 155.627 3.620 -999.990 -999.990 1.556 ..P WKT 2011 02 02 01 09 55 31.3200 -97.3300 251.000 30.0 150.491 3.940 -999.990 -999.990 1.505 ..P WKT 2011 02 02 01 14 55 31.3200 -97.3300 251.000 122.0 155.093 4.700 -999.990 -999.990 1.551 ..P WKT 2011 02 02 01 19 55 31.3200 -97.3300 251.000 457.0 149.692 4.470 -999.990 -999.990 1.497 ..P WKT 2011 02 02 01 29 55 31.3200 -97.3300 251.000 30.0 155.685 4.300 -999.990 -999.990 1.557 ..P WKT 2011 02 02 01 34 55 31.3200 -97.3300 251.000 122.0 152.068 3.540 -999.990 -999.990 1.521 ..P WKT 2011 02 02 01 39 55 31.3200 -97.3300 251.000 457.0 151.085 3.610 -999.990 -999.990 1.511 ..P WKT 2011 02 02 01 44 55 31.3200 -97.3300 251.000 30.0 156.427 3.140 -999.990 -999.990 1.564 ..P WKT 2011 02 02 01 49 55 31.3200 -97.3300 251.000 122.0 148.855 3.000 -999.990 -999.990 1.489 ..P WKT 2011 02 02 01 54 55 31.3200 -97.3300 251.000 457.0 152.880 3.190 -999.990 -999.990 1.529 ..P WKT 2011 02 02 02 04 55 31.3200 -97.3300 251.000 30.0 145.826 4.260 -999.990 -999.990 1.458 ..P WKT 2011 02 02 02 09 55 31.3200 -97.3300 251.000 122.0 145.029 3.040 -999.990 -999.990 1.450 ..P WKT 2011 02 02 02 14 55 31.3200 -97.3300 251.000 457.0 145.816 3.030 -999.990 -999.990 1.458 ..P WKT 2011 02 02 02 19 55 31.3200 -97.3300 251.000 30.0 145.282 3.000 -999.990 -999.990 1.453 ..P WKT 2011 02 02 02 24 55 31.3200 -97.3300 251.000 122.0 143.429 5.930 -999.990 -999.990 1.434 ..P WKT 2011 02 02 02 29 55 31.3200 -97.3300 251.000 457.0 147.647 3.400 -999.990 -999.990 1.476 ..P WKT 2011 02 02 02 39 55 31.3200 -97.3300 251.000 30.0 144.241 3.110 -999.990 -999.990 1.442 ..P WKT 2011 02 02 02 44 55 31.3200 -97.3300 251.000 122.0 149.556 3.300 -999.990 -999.990 1.496 ..P WKT 2011 02 02 02 49 55 31.3200 -97.3300 251.000 457.0 155.138 2.940 -999.990 -999.990 1.551 ..P WKT 2011 02 02 02 54 55 31.3200 -97.3300 251.000 30.0 144.337 4.240 -999.990 -999.990 1.443 ..P WKT 2011 02 02 02 59 55 31.3200 -97.3300 251.000 122.0 143.841 3.640 -999.990 -999.990 1.438 ..P WKT 2011 02 02 03 04 55 31.3200 -97.3300 251.000 457.0 145.062 3.480 -999.990 -999.990 1.451 ..P WKT 2011 02 02 03 14 55 31.3200 -97.3300 251.000 30.0 145.958 3.280 -999.990 -999.990 1.460 ..P WKT 2011 02 02 03 19 55 31.3200 -97.3300 251.000 122.0 146.425 3.650 -999.990 -999.990 1.464 ..P WKT 2011 02 02 03 24 55 31.3200 -97.3300 251.000 457.0 142.263 4.440 -999.990 -999.990 1.423 ..P WKT 2011 02 02 03 29 55 31.3200 -97.3300 251.000 30.0 148.418 3.620 -999.990 -999.990 1.484 ..P WKT 2011 02 02 03 34 55 31.3200 -97.3300 251.000 122.0 147.298 3.500 -999.990 -999.990 1.473 ..P WKT 2011 02 02 03 39 55 31.3200 -97.3300 251.000 457.0 142.868 3.760 -999.990 -999.990 1.429 ..P WKT 2011 02 02 03 49 55 31.3200 -97.3300 251.000 30.0 150.857 4.020 -999.990 -999.990 1.509 ..P WKT 2011 02 02 03 54 55 31.3200 -97.3300 251.000 122.0 148.318 4.350 -999.990 -999.990 1.483 ..P WKT 2011 02 02 03 59 55 31.3200 -97.3300 251.000 457.0 152.532 4.870 -999.990 -999.990 1.525 ..P WKT 2011 02 02 04 04 55 31.3200 -97.3300 251.000 30.0 149.594 5.860 -999.990 -999.990 1.496 ..P WKT 2011 02 02 04 09 55 31.3200 -97.3300 251.000 122.0 157.520 4.850 -999.990 -999.990 1.575 ..P WKT 2011 02 02 04 14 55 31.3200 -97.3300 251.000 457.0 153.921 4.350 -999.990 -999.990 1.539 ..P WKT 2011 02 02 04 24 55 31.3200 -97.3300 251.000 30.0 151.413 4.810 -999.990 -999.990 1.514 ..P WKT 2011 02 02 04 29 55 31.3200 -97.3300 251.000 122.0 158.474 4.890 -999.990 -999.990 1.585 ..P WKT 2011 02 02 04 34 55 31.3200 -97.3300 251.000 457.0 151.347 5.370 -999.990 -999.990 1.513 ..P WKT 2011 02 02 04 39 55 31.3200 -97.3300 251.000 30.0 153.370 5.400 -999.990 -999.990 1.534 ..P WKT 2011 02 02 04 44 55 31.3200 -97.3300 251.000 122.0 153.404 5.830 -999.990 -999.990 1.534 ..P WKT 2011 02 02 04 49 55 31.3200 -97.3300 251.000 457.0 150.784 5.120 -999.990 -999.990 1.508 ..P WKT 2011 02 02 05 04 55 31.3200 -97.3300 251.000 30.0 150.420 4.330 -999.990 -999.990 1.504 ..P WKT 2011 02 02 05 09 55 31.3200 -97.3300 251.000 122.0 146.303 4.080 -999.990 -999.990 1.463 ..P WKT 2011 02 02 05 14 55 31.3200 -97.3300 251.000 457.0 151.483 3.770 -999.990 -999.990 1.515 ..P WKT 2011 02 02 05 19 55 31.3200 -97.3300 251.000 30.0 152.413 3.650 -999.990 -999.990 1.524 ..P WKT 2011 02 02 05 24 55 31.3200 -97.3300 251.000 122.0 150.952 3.900 -999.990 -999.990 1.510 ..P WKT 2011 02 02 05 29 55 31.3200 -97.3300 251.000 457.0 145.503 3.440 -999.990 -999.990 1.455 ..P WKT 2011 02 02 05 39 55 31.3200 -97.3300 251.000 30.0 152.354 3.370 -999.990 -999.990 1.524 ..P WKT 2011 02 02 05 44 55 31.3200 -97.3300 251.000 122.0 150.032 4.630 -999.990 -999.990 1.500 ..P WKT 2011 02 02 05 49 55 31.3200 -97.3300 251.000 457.0 155.423 3.610 -999.990 -999.990 1.554 ..P WKT 2011 02 02 05 54 55 31.3200 -97.3300 251.000 30.0 150.441 4.020 -999.990 -999.990 1.504 ..P WKT 2011 02 02 05 59 55 31.3200 -97.3300 251.000 122.0 153.972 4.450 -999.990 -999.990 1.540 ..P WKT 2011 02 02 06 04 55 31.3200 -97.3300 251.000 457.0 149.785 4.870 -999.990 -999.990 1.498 ..P WKT 2011 02 02 06 14 55 31.3200 -97.3300 251.000 30.0 149.623 5.120 -999.990 -999.990 1.496 ..P WKT 2011 02 02 06 19 55 31.3200 -97.3300 251.000 122.0 147.526 4.860 -999.990 -999.990 1.475 ..P WKT 2011 02 02 06 24 55 31.3200 -97.3300 251.000 457.0 155.551 4.220 -999.990 -999.990 1.556 ..P WKT 2011 02 02 06 29 55 31.3200 -97.3300 251.000 30.0 156.385 4.770 -999.990 -999.990 1.564 ..P WKT 2011 02 02 06 34 55 31.3200 -97.3300 251.000 122.0 154.820 3.870 -999.990 -999.990 1.548 ..P WKT 2011 02 02 06 39 55 31.3200 -97.3300 251.000 457.0 152.722 3.550 -999.990 -999.990 1.527 ..P WKT 2011 02 02 06 49 55 31.3200 -97.3300 251.000 30.0 152.333 3.620 -999.990 -999.990 1.523 ..P WKT 2011 02 02 06 54 55 31.3200 -97.3300 251.000 122.0 150.310 3.300 -999.990 -999.990 1.503 ..P WKT 2011 02 02 06 59 55 31.3200 -97.3300 251.000 457.0 154.821 3.880 -999.990 -999.990 1.548 ..P WKT 2011 02 02 07 04 55 31.3200 -97.3300 251.000 30.0 154.798 4.530 -999.990 -999.990 1.548 ..P WKT 2011 02 02 07 09 55 31.3200 -97.3300 251.000 122.0 159.445 4.690 -999.990 -999.990 1.594 ..P WKT 2011 02 02 07 14 55 31.3200 -97.3300 251.000 457.0 160.223 4.200 -999.990 -999.990 1.602 ..P WKT 2011 02 02 07 24 55 31.3200 -97.3300 251.000 30.0 158.959 3.280 -999.990 -999.990 1.590 ..P WKT 2011 02 02 07 29 55 31.3200 -97.3300 251.000 122.0 160.654 5.380 -999.990 -999.990 1.607 ..P WKT 2011 02 02 07 34 55 31.3200 -97.3300 251.000 457.0 158.210 4.570 -999.990 -999.990 1.582 ..P WKT 2011 02 02 07 39 55 31.3200 -97.3300 251.000 30.0 152.158 4.220 -999.990 -999.990 1.522 ..P WKT 2011 02 02 07 44 55 31.3200 -97.3300 251.000 122.0 149.844 3.580 -999.990 -999.990 1.498 ..P WKT 2011 02 02 07 49 55 31.3200 -97.3300 251.000 457.0 151.538 4.850 -999.990 -999.990 1.515 ..P WKT 2011 02 02 07 59 55 31.3200 -97.3300 251.000 30.0 149.105 3.920 -999.990 -999.990 1.491 ..P WKT 2011 02 02 08 04 55 31.3200 -97.3300 251.000 122.0 153.130 3.970 -999.990 -999.990 1.531 ..P WKT 2011 02 02 08 09 55 31.3200 -97.3300 251.000 457.0 154.482 4.960 -999.990 -999.990 1.545 ..P WKT 2011 02 02 08 14 55 31.3200 -97.3300 251.000 30.0 158.510 4.060 -999.990 -999.990 1.585 ..P WKT 2011 02 02 08 19 55 31.3200 -97.3300 251.000 122.0 155.182 4.220 -999.990 -999.990 1.552 ..P WKT 2011 02 02 08 24 55 31.3200 -97.3300 251.000 457.0 152.521 4.080 -999.990 -999.990 1.525 ..P WKT 2011 02 02 08 34 55 31.3200 -97.3300 251.000 30.0 159.530 4.670 -999.990 -999.990 1.595 ..P WKT 2011 02 02 08 39 55 31.3200 -97.3300 251.000 122.0 149.793 4.530 -999.990 -999.990 1.498 ..P WKT 2011 02 02 08 44 55 31.3200 -97.3300 251.000 457.0 153.308 3.820 -999.990 -999.990 1.533 ..P WKT 2011 02 02 08 49 55 31.3200 -97.3300 251.000 30.0 152.002 4.250 -999.990 -999.990 1.520 ..P WKT 2011 02 02 08 54 55 31.3200 -97.3300 251.000 122.0 158.734 3.870 -999.990 -999.990 1.587 ..P WKT 2011 02 02 08 59 55 31.3200 -97.3300 251.000 457.0 154.616 3.710 -999.990 -999.990 1.546 ..P WKT 2011 02 02 09 09 55 31.3200 -97.3300 251.000 30.0 158.572 3.590 -999.990 -999.990 1.586 ..P WKT 2011 02 02 09 14 55 31.3200 -97.3300 251.000 122.0 152.977 3.670 -999.990 -999.990 1.530 ..P WKT 2011 02 02 09 19 55 31.3200 -97.3300 251.000 457.0 152.743 4.340 -999.990 -999.990 1.527 ..P WKT 2011 02 02 09 24 55 31.3200 -97.3300 251.000 30.0 155.727 5.980 -999.990 -999.990 1.557 ..P WKT 2011 02 02 09 29 55 31.3200 -97.3300 251.000 122.0 149.592 3.960 -999.990 -999.990 1.496 ..P WKT 2011 02 02 09 34 55 31.3200 -97.3300 251.000 457.0 145.333 4.020 -999.990 -999.990 1.453 ..P WKT 2011 02 02 09 44 55 31.3200 -97.3300 251.000 30.0 144.669 3.320 -999.990 -999.990 1.447 ..P WKT 2011 02 02 09 49 55 31.3200 -97.3300 251.000 122.0 150.685 3.430 -999.990 -999.990 1.507 ..P WKT 2011 02 02 09 54 55 31.3200 -97.3300 251.000 457.0 154.019 4.160 -999.990 -999.990 1.540 ..P WKT 2011 02 02 09 59 55 31.3200 -97.3300 251.000 30.0 152.518 3.880 -999.990 -999.990 1.525 ..P WKT 2011 02 02 10 04 55 31.3200 -97.3300 251.000 122.0 153.167 2.680 -999.990 -999.990 1.532 ..P WKT 2011 02 02 10 09 55 31.3200 -97.3300 251.000 457.0 146.292 2.780 -999.990 -999.990 1.463 ..P WKT 2011 02 02 10 19 55 31.3200 -97.3300 251.000 30.0 149.122 2.800 -999.990 -999.990 1.491 ..P WKT 2011 02 02 10 24 55 31.3200 -97.3300 251.000 122.0 148.349 2.640 -999.990 -999.990 1.483 ..P WKT 2011 02 02 10 29 55 31.3200 -97.3300 251.000 457.0 156.180 2.750 -999.990 -999.990 1.562 ..P WKT 2011 02 02 10 34 55 31.3200 -97.3300 251.000 30.0 151.374 4.370 -999.990 -999.990 1.514 ..P WKT 2011 02 02 10 39 55 31.3200 -97.3300 251.000 122.0 150.870 2.900 -999.990 -999.990 1.509 ..P WKT 2011 02 02 10 44 55 31.3200 -97.3300 251.000 457.0 152.787 3.510 -999.990 -999.990 1.528 ..P WKT 2011 02 02 10 54 55 31.3200 -97.3300 251.000 30.0 154.317 4.420 -999.990 -999.990 1.543 ..P WKT 2011 02 02 10 59 55 31.3200 -97.3300 251.000 122.0 153.659 3.170 -999.990 -999.990 1.537 ..P WKT 2011 02 02 11 04 55 31.3200 -97.3300 251.000 457.0 158.656 4.120 -999.990 -999.990 1.587 ..P WKT 2011 02 02 11 09 55 31.3200 -97.3300 251.000 30.0 159.750 4.780 -999.990 -999.990 1.598 ..P WKT 2011 02 02 11 14 55 31.3200 -97.3300 251.000 122.0 162.865 4.340 -999.990 -999.990 1.629 ..P WKT 2011 02 02 11 19 55 31.3200 -97.3300 251.000 457.0 152.778 4.590 -999.990 -999.990 1.528 ..P WKT 2011 02 02 11 29 55 31.3200 -97.3300 251.000 30.0 148.026 4.630 -999.990 -999.990 1.480 ..P WKT 2011 02 02 11 34 55 31.3200 -97.3300 251.000 122.0 149.863 5.000 -999.990 -999.990 1.499 ..P WKT 2011 02 02 11 39 55 31.3200 -97.3300 251.000 457.0 146.037 4.840 -999.990 -999.990 1.460 ..P WKT 2011 02 02 11 44 55 31.3200 -97.3300 251.000 30.0 147.200 7.600 -999.990 -999.990 1.472 ..P WKT 2011 02 02 11 49 55 31.3200 -97.3300 251.000 122.0 150.655 7.260 -999.990 -999.990 1.507 ..P WKT 2011 02 02 12 09 55 31.3200 -97.3300 251.000 457.0 147.846 4.880 -999.990 -999.990 1.478 ..P WKT 2011 02 02 12 10 25 31.3200 -97.3300 251.000 457.0 144.213 4.000 -999.990 -999.990 1.442 ..P WKT 2011 02 02 12 10 55 31.3200 -97.3300 251.000 457.0 148.000 3.970 -999.990 -999.990 1.480 ..P WKT 2011 02 02 12 11 25 31.3200 -97.3300 251.000 457.0 150.303 4.300 -999.990 -999.990 1.503 ..P WKT 2011 02 02 12 11 55 31.3200 -97.3300 251.000 457.0 148.693 4.660 -999.990 -999.990 1.487 ..P WKT 2011 02 02 12 12 25 31.3200 -97.3300 251.000 457.0 148.837 4.940 -999.990 -999.990 1.488 ..P WKT 2011 02 02 12 12 55 31.3200 -97.3300 251.000 457.0 151.140 4.780 -999.990 -999.990 1.511 ..P WKT 2011 02 02 12 13 25 31.3200 -97.3300 251.000 457.0 148.317 5.060 -999.990 -999.990 1.483 ..P WKT 2011 02 02 12 13 55 31.3200 -97.3300 251.000 457.0 150.080 5.290 -999.990 -999.990 1.501 ..P WKT 2011 02 02 12 14 25 31.3200 -97.3300 251.000 457.0 144.828 5.570 -999.990 -999.990 1.448 ..P WKT 2011 02 02 12 14 55 31.3200 -97.3300 251.000 457.0 147.940 6.880 -999.990 -999.990 1.479 ..P WKT 2011 02 02 12 19 55 31.3200 -97.3300 251.000 30.0 154.374 6.730 -999.990 -999.990 1.544 ..P WKT 2011 02 02 12 24 55 31.3200 -97.3300 251.000 122.0 155.951 7.640 -999.990 -999.990 1.560 ..P WKT 2011 02 02 12 29 55 31.3200 -97.3300 251.000 457.0 153.618 6.550 -999.990 -999.990 1.536 ..P WKT 2011 02 02 12 34 55 31.3200 -97.3300 251.000 30.0 146.835 4.550 -999.990 -999.990 1.468 ..P WKT 2011 02 02 12 39 55 31.3200 -97.3300 251.000 122.0 149.222 4.550 -999.990 -999.990 1.492 ..P WKT 2011 02 02 12 44 55 31.3200 -97.3300 251.000 457.0 150.124 4.730 -999.990 -999.990 1.501 ..P WKT 2011 02 02 12 54 55 31.3200 -97.3300 251.000 30.0 155.406 4.480 -999.990 -999.990 1.554 ..P WKT 2011 02 02 12 59 55 31.3200 -97.3300 251.000 122.0 151.160 5.520 -999.990 -999.990 1.512 ..P WKT 2011 02 02 13 04 55 31.3200 -97.3300 251.000 457.0 158.502 4.380 -999.990 -999.990 1.585 ..P WKT 2011 02 02 13 09 55 31.3200 -97.3300 251.000 30.0 153.986 5.160 -999.990 -999.990 1.540 ..P WKT 2011 02 02 13 14 55 31.3200 -97.3300 251.000 122.0 155.938 4.000 -999.990 -999.990 1.559 ..P WKT 2011 02 02 13 19 55 31.3200 -97.3300 251.000 457.0 147.383 3.370 -999.990 -999.990 1.474 ..P WKT 2011 02 02 13 29 55 31.3200 -97.3300 251.000 30.0 143.938 3.030 -999.990 -999.990 1.439 ..P WKT 2011 02 02 13 34 55 31.3200 -97.3300 251.000 122.0 145.275 3.300 -999.990 -999.990 1.453 ..P WKT 2011 02 02 13 39 55 31.3200 -97.3300 251.000 457.0 147.688 5.640 -999.990 -999.990 1.477 ..P WKT 2011 02 02 13 44 55 31.3200 -97.3300 251.000 30.0 136.100 7.040 -999.990 -999.990 1.361 ..P WKT 2011 02 02 13 49 55 31.3200 -97.3300 251.000 122.0 147.667 6.140 -999.990 -999.990 1.477 ..P WKT 2011 02 02 13 54 55 31.3200 -97.3300 251.000 457.0 139.581 5.620 -999.990 -999.990 1.396 ..P WKT 2011 02 02 14 04 55 31.3200 -97.3300 251.000 30.0 149.366 4.240 -999.990 -999.990 1.494 ..P WKT 2011 02 02 14 09 55 31.3200 -97.3300 251.000 122.0 144.627 6.200 -999.990 -999.990 1.446 ..P WKT 2011 02 02 14 14 55 31.3200 -97.3300 251.000 457.0 141.504 8.050 -999.990 -999.990 1.415 ..P WKT 2011 02 02 14 19 55 31.3200 -97.3300 251.000 30.0 151.833 6.580 -999.990 -999.990 1.518 ..P WKT 2011 02 02 14 24 55 31.3200 -97.3300 251.000 122.0 148.171 5.460 -999.990 -999.990 1.482 ..P WKT 2011 02 02 14 29 55 31.3200 -97.3300 251.000 457.0 152.042 4.280 -999.990 -999.990 1.520 ..P WKT 2011 02 02 14 39 55 31.3200 -97.3300 251.000 30.0 147.986 3.350 -999.990 -999.990 1.480 ..P WKT 2011 02 02 14 44 55 31.3200 -97.3300 251.000 122.0 144.902 5.760 -999.990 -999.990 1.449 ..P WKT 2011 02 02 14 49 55 31.3200 -97.3300 251.000 457.0 143.970 5.800 -999.990 -999.990 1.440 ..P WKT 2011 02 02 14 54 55 31.3200 -97.3300 251.000 30.0 139.812 5.620 -999.990 -999.990 1.398 ..P WKT 2011 02 02 14 59 55 31.3200 -97.3300 251.000 122.0 142.780 3.350 -999.990 -999.990 1.428 ..P WKT 2011 02 02 15 04 55 31.3200 -97.3300 251.000 457.0 146.283 4.080 -999.990 -999.990 1.463 ..P WKT 2011 02 02 15 14 55 31.3200 -97.3300 251.000 30.0 143.710 3.110 -999.990 -999.990 1.437 ..P WKT 2011 02 02 15 19 55 31.3200 -97.3300 251.000 122.0 150.801 3.040 -999.990 -999.990 1.508 ..P WKT 2011 02 02 15 24 55 31.3200 -97.3300 251.000 457.0 146.876 3.040 -999.990 -999.990 1.469 ..P WKT 2011 02 02 15 29 55 31.3200 -97.3300 251.000 30.0 147.114 3.060 -999.990 -999.990 1.471 ..P WKT 2011 02 02 15 34 55 31.3200 -97.3300 251.000 122.0 141.444 4.060 -999.990 -999.990 1.414 ..P WKT 2011 02 02 15 39 55 31.3200 -97.3300 251.000 457.0 152.025 3.460 -999.990 -999.990 1.520 ..P WKT 2011 02 02 15 49 55 31.3200 -97.3300 251.000 30.0 145.769 3.020 -999.990 -999.990 1.458 ..P WKT 2011 02 02 15 54 55 31.3200 -97.3300 251.000 122.0 149.882 3.970 -999.990 -999.990 1.499 ..P WKT 2011 02 02 15 59 55 31.3200 -97.3300 251.000 457.0 153.995 3.060 -999.990 -999.990 1.540 ..P WKT 2011 02 02 16 04 55 31.3200 -97.3300 251.000 30.0 153.677 3.380 -999.990 -999.990 1.537 ..P WKT 2011 02 02 16 09 55 31.3200 -97.3300 251.000 122.0 148.662 3.170 -999.990 -999.990 1.487 ..P WKT 2011 02 02 16 14 55 31.3200 -97.3300 251.000 457.0 154.115 3.160 -999.990 -999.990 1.541 ..P WKT 2011 02 02 16 24 55 31.3200 -97.3300 251.000 30.0 150.854 4.010 -999.990 -999.990 1.509 ..P WKT 2011 02 02 16 29 55 31.3200 -97.3300 251.000 122.0 145.228 3.400 -999.990 -999.990 1.452 ..P WKT 2011 02 02 16 34 55 31.3200 -97.3300 251.000 457.0 143.090 5.300 -999.990 -999.990 1.431 ..P WKT 2011 02 02 16 39 55 31.3200 -97.3300 251.000 30.0 145.916 7.140 -999.990 -999.990 1.459 ..P WKT 2011 02 02 16 44 55 31.3200 -97.3300 251.000 122.0 144.181 6.010 -999.990 -999.990 1.442 ..P WKT 2011 02 02 16 49 55 31.3200 -97.3300 251.000 457.0 139.632 4.430 -999.990 -999.990 1.396 ..P WKT 2011 02 02 17 04 55 31.3200 -97.3300 251.000 30.0 145.454 5.690 -999.990 -999.990 1.455 ..P WKT 2011 02 02 17 09 55 31.3200 -97.3300 251.000 122.0 143.466 6.690 -999.990 -999.990 1.435 ..P WKT 2011 02 02 17 14 55 31.3200 -97.3300 251.000 457.0 143.892 7.480 -999.990 -999.990 1.439 ..P WKT 2011 02 02 17 19 55 31.3200 -97.3300 251.000 30.0 140.029 4.420 -999.990 -999.990 1.400 ..P WKT 2011 02 02 17 24 55 31.3200 -97.3300 251.000 122.0 141.259 3.030 -999.990 -999.990 1.413 ..P WKT 2011 02 02 17 29 55 31.3200 -97.3300 251.000 457.0 146.508 2.760 -999.990 -999.990 1.465 ..P WKT 2011 02 02 17 39 55 31.3200 -97.3300 251.000 30.0 150.329 3.070 -999.990 -999.990 1.503 ..P WKT 2011 02 02 17 44 55 31.3200 -97.3300 251.000 122.0 143.813 3.350 -999.990 -999.990 1.438 ..P WKT 2011 02 02 17 49 55 31.3200 -97.3300 251.000 457.0 149.352 3.740 -999.990 -999.990 1.494 ..P WKT 2011 02 02 17 54 55 31.3200 -97.3300 251.000 30.0 144.444 3.740 -999.990 -999.990 1.444 ..P WKT 2011 02 02 17 59 55 31.3200 -97.3300 251.000 122.0 145.161 3.210 -999.990 -999.990 1.452 ..P WKT 2011 02 02 18 04 55 31.3200 -97.3300 251.000 457.0 151.768 2.620 -999.990 -999.990 1.518 ..P WKT 2011 02 02 18 14 55 31.3200 -97.3300 251.000 30.0 149.988 3.130 -999.990 -999.990 1.500 ..P WKT 2011 02 02 18 19 55 31.3200 -97.3300 251.000 122.0 156.324 3.500 -999.990 -999.990 1.563 ..P WKT 2011 02 02 18 24 55 31.3200 -97.3300 251.000 457.0 152.222 3.040 -999.990 -999.990 1.522 ..P WKT 2011 02 02 18 29 55 31.3200 -97.3300 251.000 30.0 147.050 3.250 -999.990 -999.990 1.471 ..P WKT 2011 02 02 18 34 55 31.3200 -97.3300 251.000 122.0 141.076 3.320 -999.990 -999.990 1.411 ..P WKT 2011 02 02 18 39 55 31.3200 -97.3300 251.000 457.0 141.792 4.150 -999.990 -999.990 1.418 ..P WKT 2011 02 02 18 49 55 31.3200 -97.3300 251.000 30.0 149.932 5.090 -999.990 -999.990 1.499 ..P WKT 2011 02 02 18 54 55 31.3200 -97.3300 251.000 122.0 146.654 3.800 -999.990 -999.990 1.467 ..P WKT 2011 02 02 18 59 55 31.3200 -97.3300 251.000 457.0 140.035 3.440 -999.990 -999.990 1.400 ..P WKT 2011 02 02 19 04 55 31.3200 -97.3300 251.000 30.0 144.513 3.880 -999.990 -999.990 1.445 ..P WKT 2011 02 02 19 09 55 31.3200 -97.3300 251.000 122.0 145.382 3.750 -999.990 -999.990 1.454 ..P WKT 2011 02 02 19 14 55 31.3200 -97.3300 251.000 457.0 143.444 3.260 -999.990 -999.990 1.434 ..P WKT 2011 02 02 19 24 55 31.3200 -97.3300 251.000 30.0 145.562 5.290 -999.990 -999.990 1.456 ..P WKT 2011 02 02 19 29 55 31.3200 -97.3300 251.000 122.0 143.337 3.110 -999.990 -999.990 1.433 ..P WKT 2011 02 02 19 34 55 31.3200 -97.3300 251.000 457.0 140.980 3.370 -999.990 -999.990 1.410 ..P WKT 2011 02 02 19 39 55 31.3200 -97.3300 251.000 30.0 145.169 3.390 -999.990 -999.990 1.452 ..P WKT 2011 02 02 19 44 55 31.3200 -97.3300 251.000 122.0 144.281 3.050 -999.990 -999.990 1.443 ..P WKT 2011 02 02 19 49 55 31.3200 -97.3300 251.000 457.0 142.993 2.700 -999.990 -999.990 1.430 ..P WKT 2011 02 02 19 59 55 31.3200 -97.3300 251.000 30.0 144.747 4.660 -999.990 -999.990 1.447 ..P WKT 2011 02 02 20 04 55 31.3200 -97.3300 251.000 122.0 148.859 3.430 -999.990 -999.990 1.489 ..P WKT 2011 02 02 20 09 55 31.3200 -97.3300 251.000 457.0 144.690 2.930 -999.990 -999.990 1.447 ..P WKT 2011 02 02 20 14 55 31.3200 -97.3300 251.000 30.0 145.194 5.160 -999.990 -999.990 1.452 ..P WKT 2011 02 02 20 19 55 31.3200 -97.3300 251.000 122.0 141.694 2.930 -999.990 -999.990 1.417 ..P WKT 2011 02 02 20 24 55 31.3200 -97.3300 251.000 457.0 143.801 2.510 -999.990 -999.990 1.438 ..P WKT 2011 02 02 20 34 55 31.3200 -97.3300 251.000 30.0 142.084 2.830 -999.990 -999.990 1.421 ..P WKT 2011 02 02 20 39 55 31.3200 -97.3300 251.000 122.0 148.270 4.910 -999.990 -999.990 1.483 ..P WKT 2011 02 02 20 44 55 31.3200 -97.3300 251.000 457.0 141.512 4.320 -999.990 -999.990 1.415 ..P WKT 2011 02 02 20 49 55 31.3200 -97.3300 251.000 30.0 140.226 2.650 -999.990 -999.990 1.402 ..P WKT 2011 02 02 20 54 55 31.3200 -97.3300 251.000 122.0 140.807 2.710 -999.990 -999.990 1.408 ..P WKT 2011 02 02 20 59 55 31.3200 -97.3300 251.000 457.0 138.454 2.250 -999.990 -999.990 1.385 ..P WKT 2011 02 02 21 09 55 31.3200 -97.3300 251.000 30.0 138.873 3.360 -999.990 -999.990 1.389 ..P WKT 2011 02 02 21 14 55 31.3200 -97.3300 251.000 122.0 137.378 2.580 -999.990 -999.990 1.374 ..P WKT 2011 02 02 21 19 55 31.3200 -97.3300 251.000 457.0 138.550 2.730 -999.990 -999.990 1.386 ..P WKT 2011 02 02 21 24 55 31.3200 -97.3300 251.000 30.0 133.855 3.610 -999.990 -999.990 1.339 ..P WKT 2011 02 02 21 29 55 31.3200 -97.3300 251.000 122.0 138.227 4.150 -999.990 -999.990 1.382 ..P WKT 2011 02 02 21 34 55 31.3200 -97.3300 251.000 457.0 135.666 3.630 -999.990 -999.990 1.357 ..P WKT 2011 02 02 21 44 55 31.3200 -97.3300 251.000 30.0 138.656 4.430 -999.990 -999.990 1.387 ..P WKT 2011 02 02 21 49 55 31.3200 -97.3300 251.000 122.0 138.342 3.750 -999.990 -999.990 1.383 ..P WKT 2011 02 02 21 54 55 31.3200 -97.3300 251.000 457.0 140.159 4.130 -999.990 -999.990 1.402 ..P WKT 2011 02 02 21 59 55 31.3200 -97.3300 251.000 30.0 139.313 4.310 -999.990 -999.990 1.393 ..P WKT 2011 02 02 22 04 55 31.3200 -97.3300 251.000 122.0 143.528 3.960 -999.990 -999.990 1.435 ..P WKT 2011 02 02 22 09 55 31.3200 -97.3300 251.000 457.0 139.484 3.290 -999.990 -999.990 1.395 ..P WKT 2011 02 02 22 19 55 31.3200 -97.3300 251.000 30.0 142.109 3.730 -999.990 -999.990 1.421 ..P WKT 2011 02 02 22 24 55 31.3200 -97.3300 251.000 122.0 146.380 3.630 -999.990 -999.990 1.464 ..P WKT 2011 02 02 22 29 55 31.3200 -97.3300 251.000 457.0 142.927 3.750 -999.990 -999.990 1.429 ..P WKT 2011 02 02 22 34 55 31.3200 -97.3300 251.000 30.0 145.865 4.190 -999.990 -999.990 1.459 ..P WKT 2011 02 02 22 39 55 31.3200 -97.3300 251.000 122.0 139.485 4.040 -999.990 -999.990 1.395 ..P WKT 2011 02 02 22 44 55 31.3200 -97.3300 251.000 457.0 136.167 3.700 -999.990 -999.990 1.362 ..P WKT 2011 02 02 22 54 55 31.3200 -97.3300 251.000 30.0 141.737 3.460 -999.990 -999.990 1.417 ..P WKT 2011 02 02 22 59 55 31.3200 -97.3300 251.000 122.0 145.700 3.330 -999.990 -999.990 1.457 ..P WKT 2011 02 02 23 04 55 31.3200 -97.3300 251.000 457.0 138.355 3.000 -999.990 -999.990 1.384 ..P WKT 2011 02 02 23 09 55 31.3200 -97.3300 251.000 30.0 144.578 3.620 -999.990 -999.990 1.446 ..P WKT 2011 02 02 23 14 55 31.3200 -97.3300 251.000 122.0 142.022 3.260 -999.990 -999.990 1.420 ..P WKT 2011 02 02 23 19 55 31.3200 -97.3300 251.000 457.0 144.254 2.970 -999.990 -999.990 1.443 ..P WKT 2011 02 02 23 29 55 31.3200 -97.3300 251.000 30.0 146.359 2.860 -999.990 -999.990 1.464 ..P WKT 2011 02 02 23 34 55 31.3200 -97.3300 251.000 122.0 146.099 3.110 -999.990 -999.990 1.461 ..P WKT 2011 02 02 23 39 55 31.3200 -97.3300 251.000 457.0 142.517 2.920 -999.990 -999.990 1.425 ..P WKT 2011 02 02 23 44 55 31.3200 -97.3300 251.000 30.0 142.923 3.800 -999.990 -999.990 1.429 ..P WKT 2011 02 02 23 49 55 31.3200 -97.3300 251.000 122.0 144.258 3.410 -999.990 -999.990 1.443 ..P WKT 2011 02 03 00 09 55 31.3200 -97.3300 251.000 457.0 138.529 3.900 -999.990 -999.990 1.385 ..P WKT 2011 02 03 00 10 25 31.3200 -97.3300 251.000 457.0 137.771 3.790 -999.990 -999.990 1.378 ..P WKT 2011 02 03 00 10 55 31.3200 -97.3300 251.000 457.0 138.740 3.750 -999.990 -999.990 1.387 ..P WKT 2011 02 03 00 11 25 31.3200 -97.3300 251.000 457.0 137.185 3.050 -999.990 -999.990 1.372 ..P WKT 2011 02 03 00 11 55 31.3200 -97.3300 251.000 457.0 135.364 3.500 -999.990 -999.990 1.354 ..P WKT 2011 02 03 00 12 25 31.3200 -97.3300 251.000 457.0 132.746 3.960 -999.990 -999.990 1.327 ..P WKT 2011 02 03 00 12 55 31.3200 -97.3300 251.000 457.0 141.153 3.290 -999.990 -999.990 1.412 ..P WKT 2011 02 03 00 13 25 31.3200 -97.3300 251.000 457.0 141.591 3.270 -999.990 -999.990 1.416 ..P WKT 2011 02 03 00 13 55 31.3200 -97.3300 251.000 457.0 138.973 3.050 -999.990 -999.990 1.390 ..P WKT 2011 02 03 00 14 25 31.3200 -97.3300 251.000 457.0 142.067 3.100 -999.990 -999.990 1.421 ..P WKT 2011 02 03 00 14 55 31.3200 -97.3300 251.000 457.0 137.988 3.080 -999.990 -999.990 1.380 ..P WKT 2011 02 03 00 19 55 31.3200 -97.3300 251.000 30.0 138.377 4.510 -999.990 -999.990 1.384 ..P WKT 2011 02 03 00 24 55 31.3200 -97.3300 251.000 122.0 140.226 3.430 -999.990 -999.990 1.402 ..P WKT 2011 02 03 00 29 55 31.3200 -97.3300 251.000 457.0 145.528 3.320 -999.990 -999.990 1.455 ..P WKT 2011 02 03 00 34 55 31.3200 -97.3300 251.000 30.0 138.215 3.040 -999.990 -999.990 1.382 ..P WKT 2011 02 03 00 39 55 31.3200 -97.3300 251.000 122.0 142.719 2.650 -999.990 -999.990 1.427 ..P WKT 2011 02 03 00 44 55 31.3200 -97.3300 251.000 457.0 143.372 3.130 -999.990 -999.990 1.434 ..P WKT 2011 02 03 00 54 55 31.3200 -97.3300 251.000 30.0 150.255 3.840 -999.990 -999.990 1.503 ..P WKT 2011 02 03 00 59 55 31.3200 -97.3300 251.000 122.0 144.013 2.640 -999.990 -999.990 1.440 ..P WKT 2011 02 03 01 04 55 31.3200 -97.3300 251.000 457.0 146.262 3.030 -999.990 -999.990 1.463 ..P WKT 2011 02 03 01 09 55 31.3200 -97.3300 251.000 30.0 145.326 4.260 -999.990 -999.990 1.453 ..P WKT 2011 02 03 01 14 55 31.3200 -97.3300 251.000 122.0 145.187 3.560 -999.990 -999.990 1.452 ..P WKT 2011 02 03 01 19 55 31.3200 -97.3300 251.000 457.0 148.496 2.620 -999.990 -999.990 1.485 ..P WKT 2011 02 03 01 29 55 31.3200 -97.3300 251.000 30.0 148.823 2.900 -999.990 -999.990 1.488 ..P WKT 2011 02 03 01 34 55 31.3200 -97.3300 251.000 122.0 146.904 3.330 -999.990 -999.990 1.469 ..P WKT 2011 02 03 01 39 55 31.3200 -97.3300 251.000 457.0 146.046 3.860 -999.990 -999.990 1.460 ..P WKT 2011 02 03 01 44 55 31.3200 -97.3300 251.000 30.0 146.777 3.400 -999.990 -999.990 1.468 ..P WKT 2011 02 03 01 49 55 31.3200 -97.3300 251.000 122.0 143.004 3.370 -999.990 -999.990 1.430 ..P WKT 2011 02 03 01 54 55 31.3200 -97.3300 251.000 457.0 144.266 4.060 -999.990 -999.990 1.443 ..P WKT 2011 02 03 02 04 55 31.3200 -97.3300 251.000 30.0 142.607 4.210 -999.990 -999.990 1.426 ..P WKT 2011 02 03 02 09 55 31.3200 -97.3300 251.000 122.0 151.077 4.370 -999.990 -999.990 1.511 ..P WKT 2011 02 03 02 14 55 31.3200 -97.3300 251.000 457.0 134.385 3.980 -999.990 -999.990 1.344 ..P WKT 2011 02 03 02 19 55 31.3200 -97.3300 251.000 30.0 139.676 4.620 -999.990 -999.990 1.397 ..P WKT 2011 02 03 02 24 55 31.3200 -97.3300 251.000 122.0 140.994 3.530 -999.990 -999.990 1.410 ..P WKT 2011 02 03 02 29 55 31.3200 -97.3300 251.000 457.0 142.047 3.930 -999.990 -999.990 1.420 ..P WKT 2011 02 03 02 39 55 31.3200 -97.3300 251.000 30.0 143.037 3.460 -999.990 -999.990 1.430 ..P WKT 2011 02 03 02 44 55 31.3200 -97.3300 251.000 122.0 144.298 4.260 -999.990 -999.990 1.443 ..P WKT 2011 02 03 02 49 55 31.3200 -97.3300 251.000 457.0 145.823 3.430 -999.990 -999.990 1.458 ..P WKT 2011 02 03 02 54 55 31.3200 -97.3300 251.000 30.0 147.082 3.820 -999.990 -999.990 1.471 ..P WKT 2011 02 03 02 59 55 31.3200 -97.3300 251.000 122.0 145.961 3.350 -999.990 -999.990 1.460 ..P WKT 2011 02 03 03 04 55 31.3200 -97.3300 251.000 457.0 153.437 3.100 -999.990 -999.990 1.534 ..P WKT 2011 02 03 03 14 55 31.3200 -97.3300 251.000 30.0 147.075 3.120 -999.990 -999.990 1.471 ..P WKT 2011 02 03 03 19 55 31.3200 -97.3300 251.000 122.0 146.199 3.020 -999.990 -999.990 1.462 ..P WKT 2011 02 03 03 24 55 31.3200 -97.3300 251.000 457.0 152.595 3.790 -999.990 -999.990 1.526 ..P WKT 2011 02 03 03 29 55 31.3200 -97.3300 251.000 30.0 144.845 3.750 -999.990 -999.990 1.448 ..P WKT 2011 02 03 03 34 55 31.3200 -97.3300 251.000 122.0 147.803 4.160 -999.990 -999.990 1.478 ..P WKT 2011 02 03 03 39 55 31.3200 -97.3300 251.000 457.0 146.400 4.280 -999.990 -999.990 1.464 ..P WKT 2011 02 03 03 49 55 31.3200 -97.3300 251.000 30.0 151.407 4.450 -999.990 -999.990 1.514 ..P WKT 2011 02 03 03 54 55 31.3200 -97.3300 251.000 122.0 149.626 4.160 -999.990 -999.990 1.496 ..P WKT 2011 02 03 03 59 55 31.3200 -97.3300 251.000 457.0 154.714 4.450 -999.990 -999.990 1.547 ..P WKT 2011 02 03 04 04 55 31.3200 -97.3300 251.000 30.0 150.160 3.690 -999.990 -999.990 1.502 ..P WKT 2011 02 03 04 09 55 31.3200 -97.3300 251.000 122.0 146.266 3.810 -999.990 -999.990 1.463 ..P WKT 2011 02 03 04 14 55 31.3200 -97.3300 251.000 457.0 147.392 3.020 -999.990 -999.990 1.474 ..P WKT 2011 02 03 04 24 55 31.3200 -97.3300 251.000 30.0 148.586 5.320 -999.990 -999.990 1.486 ..P WKT 2011 02 03 04 29 55 31.3200 -97.3300 251.000 122.0 147.994 2.980 -999.990 -999.990 1.480 ..P WKT 2011 02 03 04 34 55 31.3200 -97.3300 251.000 457.0 145.160 3.490 -999.990 -999.990 1.452 ..P WKT 2011 02 03 04 39 55 31.3200 -97.3300 251.000 30.0 146.021 3.600 -999.990 -999.990 1.460 ..P WKT 2011 02 03 04 44 55 31.3200 -97.3300 251.000 122.0 147.409 3.990 -999.990 -999.990 1.474 ..P WKT 2011 02 03 04 49 55 31.3200 -97.3300 251.000 457.0 149.589 3.740 -999.990 -999.990 1.496 ..P WKT 2011 02 03 05 04 55 31.3200 -97.3300 251.000 30.0 150.001 4.020 -999.990 -999.990 1.500 ..P WKT 2011 02 03 05 09 55 31.3200 -97.3300 251.000 122.0 145.163 3.660 -999.990 -999.990 1.452 ..P WKT 2011 02 03 05 14 55 31.3200 -97.3300 251.000 457.0 154.564 5.160 -999.990 -999.990 1.546 ..P WKT 2011 02 03 05 19 55 31.3200 -97.3300 251.000 30.0 144.717 4.660 -999.990 -999.990 1.447 ..P WKT 2011 02 03 05 24 55 31.3200 -97.3300 251.000 122.0 152.270 5.040 -999.990 -999.990 1.523 ..P WKT 2011 02 03 05 29 55 31.3200 -97.3300 251.000 457.0 152.969 4.080 -999.990 -999.990 1.530 ..P WKT 2011 02 03 05 39 55 31.3200 -97.3300 251.000 30.0 146.791 3.260 -999.990 -999.990 1.468 ..P WKT 2011 02 03 05 44 55 31.3200 -97.3300 251.000 122.0 154.143 4.220 -999.990 -999.990 1.541 ..P WKT 2011 02 03 05 49 55 31.3200 -97.3300 251.000 457.0 152.272 4.810 -999.990 -999.990 1.523 ..P WKT 2011 02 03 05 54 55 31.3200 -97.3300 251.000 30.0 148.558 3.930 -999.990 -999.990 1.486 ..P WKT 2011 02 03 05 59 55 31.3200 -97.3300 251.000 122.0 148.533 4.190 -999.990 -999.990 1.485 ..P WKT 2011 02 03 06 04 55 31.3200 -97.3300 251.000 457.0 155.881 2.950 -999.990 -999.990 1.559 ..P WKT 2011 02 03 06 14 55 31.3200 -97.3300 251.000 30.0 142.119 3.190 -999.990 -999.990 1.421 ..P WKT 2011 02 03 06 19 55 31.3200 -97.3300 251.000 122.0 148.392 3.210 -999.990 -999.990 1.484 ..P WKT 2011 02 03 06 24 55 31.3200 -97.3300 251.000 457.0 146.506 3.520 -999.990 -999.990 1.465 ..P WKT 2011 02 03 06 29 55 31.3200 -97.3300 251.000 30.0 148.567 3.130 -999.990 -999.990 1.486 ..P WKT 2011 02 03 06 34 55 31.3200 -97.3300 251.000 122.0 151.154 3.010 -999.990 -999.990 1.512 ..P WKT 2011 02 03 06 39 55 31.3200 -97.3300 251.000 457.0 159.398 3.130 -999.990 -999.990 1.594 ..P WKT 2011 02 03 06 49 55 31.3200 -97.3300 251.000 30.0 151.152 3.100 -999.990 -999.990 1.512 ..P WKT 2011 02 03 06 54 55 31.3200 -97.3300 251.000 122.0 156.499 4.620 -999.990 -999.990 1.565 ..P WKT 2011 02 03 06 59 55 31.3200 -97.3300 251.000 457.0 157.243 3.920 -999.990 -999.990 1.572 ..P WKT 2011 02 03 07 04 55 31.3200 -97.3300 251.000 30.0 153.911 4.860 -999.990 -999.990 1.539 ..P WKT 2011 02 03 07 09 55 31.3200 -97.3300 251.000 122.0 153.340 4.510 -999.990 -999.990 1.533 ..P WKT 2011 02 03 07 14 55 31.3200 -97.3300 251.000 457.0 163.153 5.000 -999.990 -999.990 1.632 ..P WKT 2011 02 03 07 24 55 31.3200 -97.3300 251.000 30.0 153.412 3.720 -999.990 -999.990 1.534 ..P WKT 2011 02 03 07 29 55 31.3200 -97.3300 251.000 122.0 155.149 4.170 -999.990 -999.990 1.551 ..P WKT 2011 02 03 07 34 55 31.3200 -97.3300 251.000 457.0 158.596 5.240 -999.990 -999.990 1.586 ..P WKT 2011 02 03 07 39 55 31.3200 -97.3300 251.000 30.0 154.553 4.960 -999.990 -999.990 1.546 ..P WKT 2011 02 03 07 44 55 31.3200 -97.3300 251.000 122.0 153.138 4.490 -999.990 -999.990 1.531 ..P WKT 2011 02 03 07 49 55 31.3200 -97.3300 251.000 457.0 152.117 3.020 -999.990 -999.990 1.521 ..P WKT 2011 02 03 07 59 55 31.3200 -97.3300 251.000 30.0 150.078 3.310 -999.990 -999.990 1.501 ..P WKT 2011 02 03 08 04 55 31.3200 -97.3300 251.000 122.0 152.734 4.880 -999.990 -999.990 1.527 ..P WKT 2011 02 03 08 09 55 31.3200 -97.3300 251.000 457.0 163.790 4.270 -999.990 -999.990 1.638 ..P WKT 2011 02 03 08 14 55 31.3200 -97.3300 251.000 30.0 156.469 4.320 -999.990 -999.990 1.565 ..P WKT 2011 02 03 08 19 55 31.3200 -97.3300 251.000 122.0 160.567 4.720 -999.990 -999.990 1.606 ..P WKT 2011 02 03 08 24 55 31.3200 -97.3300 251.000 457.0 158.760 4.740 -999.990 -999.990 1.588 ..P WKT 2011 02 03 08 34 55 31.3200 -97.3300 251.000 30.0 160.899 5.210 -999.990 -999.990 1.609 ..P WKT 2011 02 03 08 39 55 31.3200 -97.3300 251.000 122.0 161.172 4.700 -999.990 -999.990 1.612 ..P WKT 2011 02 03 08 44 55 31.3200 -97.3300 251.000 457.0 165.903 4.180 -999.990 -999.990 1.659 ..P WKT 2011 02 03 08 49 55 31.3200 -97.3300 251.000 30.0 163.291 3.990 -999.990 -999.990 1.633 ..P WKT 2011 02 03 08 54 55 31.3200 -97.3300 251.000 122.0 161.203 4.050 -999.990 -999.990 1.612 ..P WKT 2011 02 03 08 59 55 31.3200 -97.3300 251.000 457.0 164.622 4.210 -999.990 -999.990 1.646 ..P WKT 2011 02 03 09 09 55 31.3200 -97.3300 251.000 30.0 153.295 3.040 -999.990 -999.990 1.533 ..P WKT 2011 02 03 09 14 55 31.3200 -97.3300 251.000 122.0 156.639 5.540 -999.990 -999.990 1.566 ..P WKT 2011 02 03 09 19 55 31.3200 -97.3300 251.000 457.0 152.382 3.520 -999.990 -999.990 1.524 ..P WKT 2011 02 03 09 24 55 31.3200 -97.3300 251.000 30.0 154.677 5.910 -999.990 -999.990 1.547 ..P WKT 2011 02 03 09 29 55 31.3200 -97.3300 251.000 122.0 155.399 3.710 -999.990 -999.990 1.554 ..P WKT 2011 02 03 09 34 55 31.3200 -97.3300 251.000 457.0 155.597 3.380 -999.990 -999.990 1.556 ..P WKT 2011 02 03 09 44 55 31.3200 -97.3300 251.000 30.0 161.643 3.540 -999.990 -999.990 1.616 ..P WKT 2011 02 03 09 49 55 31.3200 -97.3300 251.000 122.0 160.157 4.060 -999.990 -999.990 1.602 ..P WKT 2011 02 03 09 54 55 31.3200 -97.3300 251.000 457.0 158.934 4.410 -999.990 -999.990 1.589 ..P WKT 2011 02 03 09 59 55 31.3200 -97.3300 251.000 30.0 155.878 5.190 -999.990 -999.990 1.559 ..P WKT 2011 02 03 10 04 55 31.3200 -97.3300 251.000 122.0 160.938 4.670 -999.990 -999.990 1.609 ..P WKT 2011 02 03 10 09 55 31.3200 -97.3300 251.000 457.0 156.049 3.520 -999.990 -999.990 1.560 ..P WKT 2011 02 03 10 19 55 31.3200 -97.3300 251.000 30.0 163.006 3.610 -999.990 -999.990 1.630 ..P WKT 2011 02 03 10 24 55 31.3200 -97.3300 251.000 122.0 159.148 4.580 -999.990 -999.990 1.591 ..P WKT 2011 02 03 10 29 55 31.3200 -97.3300 251.000 457.0 154.636 4.920 -999.990 -999.990 1.546 ..P WKT 2011 02 03 10 34 55 31.3200 -97.3300 251.000 30.0 152.087 4.310 -999.990 -999.990 1.521 ..P WKT 2011 02 03 10 39 55 31.3200 -97.3300 251.000 122.0 154.901 4.010 -999.990 -999.990 1.549 ..P WKT 2011 02 03 10 44 55 31.3200 -97.3300 251.000 457.0 156.538 3.490 -999.990 -999.990 1.565 ..P WKT 2011 02 03 10 54 55 31.3200 -97.3300 251.000 30.0 156.298 3.600 -999.990 -999.990 1.563 ..P WKT 2011 02 03 10 59 55 31.3200 -97.3300 251.000 122.0 153.377 4.100 -999.990 -999.990 1.534 ..P WKT 2011 02 03 11 04 55 31.3200 -97.3300 251.000 457.0 150.588 4.470 -999.990 -999.990 1.506 ..P WKT 2011 02 03 11 09 55 31.3200 -97.3300 251.000 30.0 150.283 4.420 -999.990 -999.990 1.503 ..P WKT 2011 02 03 11 14 55 31.3200 -97.3300 251.000 122.0 146.449 4.780 -999.990 -999.990 1.464 ..P WKT 2011 02 03 11 19 55 31.3200 -97.3300 251.000 457.0 153.852 5.490 -999.990 -999.990 1.539 ..P WKT 2011 02 03 11 29 55 31.3200 -97.3300 251.000 30.0 148.785 5.660 -999.990 -999.990 1.488 ..P WKT 2011 02 03 11 34 55 31.3200 -97.3300 251.000 122.0 150.295 4.660 -999.990 -999.990 1.503 ..P WKT 2011 02 03 11 39 55 31.3200 -97.3300 251.000 457.0 148.408 4.250 -999.990 -999.990 1.484 ..P WKT 2011 02 03 11 44 55 31.3200 -97.3300 251.000 30.0 144.825 4.050 -999.990 -999.990 1.448 ..P WKT 2011 02 03 11 49 55 31.3200 -97.3300 251.000 122.0 149.337 3.610 -999.990 -999.990 1.493 ..P WKT 2011 02 03 12 09 55 31.3200 -97.3300 251.000 457.0 144.409 2.940 -999.990 -999.990 1.444 ..P WKT 2011 02 03 12 10 25 31.3200 -97.3300 251.000 457.0 144.868 3.790 -999.990 -999.990 1.449 ..P WKT 2011 02 03 12 10 55 31.3200 -97.3300 251.000 457.0 151.069 3.080 -999.990 -999.990 1.511 ..P WKT 2011 02 03 12 11 25 31.3200 -97.3300 251.000 457.0 153.095 3.870 -999.990 -999.990 1.531 ..P WKT 2011 02 03 12 11 55 31.3200 -97.3300 251.000 457.0 147.679 4.870 -999.990 -999.990 1.477 ..P WKT 2011 02 03 12 12 25 31.3200 -97.3300 251.000 457.0 148.398 3.500 -999.990 -999.990 1.484 ..P WKT 2011 02 03 12 12 55 31.3200 -97.3300 251.000 457.0 140.503 4.170 -999.990 -999.990 1.405 ..P WKT 2011 02 03 12 13 25 31.3200 -97.3300 251.000 457.0 140.047 4.350 -999.990 -999.990 1.400 ..P WKT 2011 02 03 12 13 55 31.3200 -97.3300 251.000 457.0 141.681 5.070 -999.990 -999.990 1.417 ..P WKT 2011 02 03 12 14 25 31.3200 -97.3300 251.000 457.0 140.442 3.690 -999.990 -999.990 1.404 ..P WKT 2011 02 03 12 14 55 31.3200 -97.3300 251.000 457.0 139.856 3.350 -999.990 -999.990 1.399 ..P WKT 2011 02 03 12 19 55 31.3200 -97.3300 251.000 30.0 140.134 3.920 -999.990 -999.990 1.401 ..P WKT 2011 02 03 12 24 55 31.3200 -97.3300 251.000 122.0 143.153 4.830 -999.990 -999.990 1.432 ..P WKT 2011 02 03 12 29 55 31.3200 -97.3300 251.000 457.0 138.729 7.030 -999.990 -999.990 1.387 ..P WKT 2011 02 03 12 34 55 31.3200 -97.3300 251.000 30.0 140.705 6.140 -999.990 -999.990 1.407 ..P WKT 2011 02 03 12 39 55 31.3200 -97.3300 251.000 122.0 143.724 4.890 -999.990 -999.990 1.437 ..P WKT 2011 02 03 12 44 55 31.3200 -97.3300 251.000 457.0 136.818 3.410 -999.990 -999.990 1.368 ..P WKT 2011 02 03 12 54 55 31.3200 -97.3300 251.000 30.0 149.109 3.880 -999.990 -999.990 1.491 ..P WKT 2011 02 03 12 59 55 31.3200 -97.3300 251.000 122.0 143.229 5.760 -999.990 -999.990 1.432 ..P WKT 2011 02 03 13 04 55 31.3200 -97.3300 251.000 457.0 144.925 5.860 -999.990 -999.990 1.449 ..P WKT 2011 02 03 13 09 55 31.3200 -97.3300 251.000 30.0 145.054 6.060 -999.990 -999.990 1.451 ..P WKT 2011 02 03 13 14 55 31.3200 -97.3300 251.000 122.0 148.318 5.540 -999.990 -999.990 1.483 ..P WKT 2011 02 03 13 19 55 31.3200 -97.3300 251.000 457.0 147.924 3.640 -999.990 -999.990 1.479 ..P WKT 2011 02 03 13 29 55 31.3200 -97.3300 251.000 30.0 147.435 4.290 -999.990 -999.990 1.474 ..P WKT 2011 02 03 13 34 55 31.3200 -97.3300 251.000 122.0 144.202 5.210 -999.990 -999.990 1.442 ..P WKT 2011 02 03 13 39 55 31.3200 -97.3300 251.000 457.0 146.198 7.000 -999.990 -999.990 1.462 ..P WKT 2011 02 03 13 44 55 31.3200 -97.3300 251.000 30.0 145.318 4.730 -999.990 -999.990 1.453 ..P WKT 2011 02 03 13 49 55 31.3200 -97.3300 251.000 122.0 146.792 3.850 -999.990 -999.990 1.468 ..P WKT 2011 02 03 13 54 55 31.3200 -97.3300 251.000 457.0 143.035 5.030 -999.990 -999.990 1.430 ..P WKT 2011 02 03 14 04 55 31.3200 -97.3300 251.000 30.0 141.518 3.210 -999.990 -999.990 1.415 ..P WKT 2011 02 03 14 09 55 31.3200 -97.3300 251.000 122.0 142.711 3.890 -999.990 -999.990 1.427 ..P WKT 2011 02 03 14 14 55 31.3200 -97.3300 251.000 457.0 150.966 5.810 -999.990 -999.990 1.510 ..P WKT 2011 02 03 14 19 55 31.3200 -97.3300 251.000 30.0 146.144 3.610 -999.990 -999.990 1.461 ..P WKT 2011 02 03 14 24 55 31.3200 -97.3300 251.000 122.0 147.076 3.400 -999.990 -999.990 1.471 ..P WKT 2011 02 03 14 29 55 31.3200 -97.3300 251.000 457.0 149.055 3.340 -999.990 -999.990 1.491 ..P WKT 2011 02 03 14 39 55 31.3200 -97.3300 251.000 30.0 147.668 4.140 -999.990 -999.990 1.477 ..P WKT 2011 02 03 14 44 55 31.3200 -97.3300 251.000 122.0 153.198 3.450 -999.990 -999.990 1.532 ..P WKT 2011 02 03 14 49 55 31.3200 -97.3300 251.000 457.0 157.028 3.460 -999.990 -999.990 1.570 ..P WKT 2011 02 03 14 54 55 31.3200 -97.3300 251.000 30.0 149.998 3.700 -999.990 -999.990 1.500 ..P WKT 2011 02 03 14 59 55 31.3200 -97.3300 251.000 122.0 154.614 3.530 -999.990 -999.990 1.546 ..P WKT 2011 02 03 15 04 55 31.3200 -97.3300 251.000 457.0 148.237 3.240 -999.990 -999.990 1.482 ..P WKT 2011 02 03 15 14 55 31.3200 -97.3300 251.000 30.0 145.148 3.290 -999.990 -999.990 1.451 ..P WKT 2011 02 03 15 19 55 31.3200 -97.3300 251.000 122.0 139.275 3.800 -999.990 -999.990 1.393 ..P WKT 2011 02 03 15 24 55 31.3200 -97.3300 251.000 457.0 144.003 3.200 -999.990 -999.990 1.440 ..P WKT 2011 02 03 15 29 55 31.3200 -97.3300 251.000 30.0 144.151 3.100 -999.990 -999.990 1.442 ..P WKT 2011 02 03 15 34 55 31.3200 -97.3300 251.000 122.0 145.215 2.980 -999.990 -999.990 1.452 ..P WKT 2011 02 03 15 39 55 31.3200 -97.3300 251.000 457.0 144.183 3.740 -999.990 -999.990 1.442 ..P WKT 2011 02 03 15 49 55 31.3200 -97.3300 251.000 30.0 143.749 3.410 -999.990 -999.990 1.437 ..P WKT 2011 02 03 15 54 55 31.3200 -97.3300 251.000 122.0 150.631 3.450 -999.990 -999.990 1.506 ..P WKT 2011 02 03 15 59 55 31.3200 -97.3300 251.000 457.0 149.919 3.310 -999.990 -999.990 1.499 ..P WKT 2011 02 03 16 04 55 31.3200 -97.3300 251.000 30.0 145.014 3.600 -999.990 -999.990 1.450 ..P WKT 2011 02 03 16 09 55 31.3200 -97.3300 251.000 122.0 142.467 3.320 -999.990 -999.990 1.425 ..P WKT 2011 02 03 16 14 55 31.3200 -97.3300 251.000 457.0 145.422 4.120 -999.990 -999.990 1.454 ..P WKT 2011 02 03 16 24 55 31.3200 -97.3300 251.000 30.0 143.414 3.350 -999.990 -999.990 1.434 ..P WKT 2011 02 03 16 29 55 31.3200 -97.3300 251.000 122.0 143.299 3.030 -999.990 -999.990 1.433 ..P WKT 2011 02 03 16 34 55 31.3200 -97.3300 251.000 457.0 152.882 3.950 -999.990 -999.990 1.529 ..P WKT 2011 02 03 16 39 55 31.3200 -97.3300 251.000 30.0 149.098 3.470 -999.990 -999.990 1.491 ..P WKT 2011 02 03 16 44 55 31.3200 -97.3300 251.000 122.0 145.839 3.000 -999.990 -999.990 1.458 ..P WKT 2011 02 03 16 49 55 31.3200 -97.3300 251.000 457.0 144.151 3.260 -999.990 -999.990 1.442 ..P WKT 2011 02 03 17 04 55 31.3200 -97.3300 251.000 30.0 145.839 2.650 -999.990 -999.990 1.458 ..P WKT 2011 02 03 17 09 55 31.3200 -97.3300 251.000 122.0 145.692 4.910 -999.990 -999.990 1.457 ..P WKT 2011 02 03 17 14 55 31.3200 -97.3300 251.000 457.0 150.265 3.530 -999.990 -999.990 1.503 ..P WKT 2011 02 03 17 19 55 31.3200 -97.3300 251.000 30.0 144.610 4.440 -999.990 -999.990 1.446 ..P WKT 2011 02 03 17 24 55 31.3200 -97.3300 251.000 122.0 143.414 3.240 -999.990 -999.990 1.434 ..P WKT 2011 02 03 17 29 55 31.3200 -97.3300 251.000 457.0 145.103 2.400 -999.990 -999.990 1.451 ..P WKT 2011 02 03 17 39 55 31.3200 -97.3300 251.000 30.0 151.267 2.850 -999.990 -999.990 1.513 ..P WKT 2011 02 03 17 44 55 31.3200 -97.3300 251.000 122.0 146.300 3.650 -999.990 -999.990 1.463 ..P WKT 2011 02 03 17 49 55 31.3200 -97.3300 251.000 457.0 151.564 5.030 -999.990 -999.990 1.516 ..P WKT 2011 02 03 17 54 55 31.3200 -97.3300 251.000 30.0 150.269 4.070 -999.990 -999.990 1.503 ..P WKT 2011 02 03 17 59 55 31.3200 -97.3300 251.000 122.0 146.087 2.760 -999.990 -999.990 1.461 ..P WKT 2011 02 03 18 04 55 31.3200 -97.3300 251.000 457.0 141.643 2.540 -999.990 -999.990 1.416 ..P WKT 2011 02 03 18 14 55 31.3200 -97.3300 251.000 30.0 146.081 3.480 -999.990 -999.990 1.461 ..P WKT 2011 02 03 18 19 55 31.3200 -97.3300 251.000 122.0 138.429 3.400 -999.990 -999.990 1.384 ..P WKT 2011 02 03 18 24 55 31.3200 -97.3300 251.000 457.0 140.489 4.010 -999.990 -999.990 1.405 ..P WKT 2011 02 03 18 29 55 31.3200 -97.3300 251.000 30.0 142.680 3.880 -999.990 -999.990 1.427 ..P WKT 2011 02 03 18 34 55 31.3200 -97.3300 251.000 122.0 145.003 5.830 -999.990 -999.990 1.450 ..P WKT 2011 02 03 18 39 55 31.3200 -97.3300 251.000 457.0 144.570 4.430 -999.990 -999.990 1.446 ..P WKT 2011 02 03 18 49 55 31.3200 -97.3300 251.000 30.0 146.141 4.830 -999.990 -999.990 1.461 ..P WKT 2011 02 03 18 54 55 31.3200 -97.3300 251.000 122.0 147.358 4.110 -999.990 -999.990 1.474 ..P WKT 2011 02 03 18 59 55 31.3200 -97.3300 251.000 457.0 145.292 4.230 -999.990 -999.990 1.453 ..P WKT 2011 02 03 19 04 55 31.3200 -97.3300 251.000 30.0 150.712 4.250 -999.990 -999.990 1.507 ..P WKT 2011 02 03 19 09 55 31.3200 -97.3300 251.000 122.0 149.829 3.530 -999.990 -999.990 1.498 ..P WKT 2011 02 03 19 14 55 31.3200 -97.3300 251.000 457.0 155.249 3.020 -999.990 -999.990 1.552 ..P WKT 2011 02 03 19 24 55 31.3200 -97.3300 251.000 30.0 150.405 3.630 -999.990 -999.990 1.504 ..P WKT 2011 02 03 19 29 55 31.3200 -97.3300 251.000 122.0 153.012 3.540 -999.990 -999.990 1.530 ..P WKT 2011 02 03 19 34 55 31.3200 -97.3300 251.000 457.0 149.312 4.030 -999.990 -999.990 1.493 ..P WKT 2011 02 03 19 39 55 31.3200 -97.3300 251.000 30.0 156.781 4.100 -999.990 -999.990 1.568 ..P WKT 2011 02 03 19 44 55 31.3200 -97.3300 251.000 122.0 151.768 4.320 -999.990 -999.990 1.518 ..P WKT 2011 02 03 19 49 55 31.3200 -97.3300 251.000 457.0 152.273 4.350 -999.990 -999.990 1.523 ..P WKT 2011 02 03 19 59 55 31.3200 -97.3300 251.000 30.0 152.307 4.190 -999.990 -999.990 1.523 ..P WKT 2011 02 03 20 04 55 31.3200 -97.3300 251.000 122.0 153.413 3.640 -999.990 -999.990 1.534 ..P WKT 2011 02 03 20 09 55 31.3200 -97.3300 251.000 457.0 155.045 3.450 -999.990 -999.990 1.550 ..P WKT 2011 02 03 20 14 55 31.3200 -97.3300 251.000 30.0 147.213 3.430 -999.990 -999.990 1.472 ..P WKT 2011 02 03 20 19 55 31.3200 -97.3300 251.000 122.0 154.366 3.110 -999.990 -999.990 1.544 ..P WKT 2011 02 03 20 24 55 31.3200 -97.3300 251.000 457.0 149.294 2.960 -999.990 -999.990 1.493 ..P WKT 2011 02 03 20 34 55 31.3200 -97.3300 251.000 30.0 150.849 2.640 -999.990 -999.990 1.508 ..P WKT 2011 02 03 20 39 55 31.3200 -97.3300 251.000 122.0 154.849 3.690 -999.990 -999.990 1.548 ..P WKT 2011 02 03 20 44 55 31.3200 -97.3300 251.000 457.0 151.747 3.720 -999.990 -999.990 1.517 ..P WKT 2011 02 03 20 49 55 31.3200 -97.3300 251.000 30.0 147.856 2.230 -999.990 -999.990 1.479 ..P WKT 2011 02 03 20 54 55 31.3200 -97.3300 251.000 122.0 153.698 4.070 -999.990 -999.990 1.537 ..P WKT 2011 02 03 20 59 55 31.3200 -97.3300 251.000 457.0 152.964 2.780 -999.990 -999.990 1.530 ..P WKT 2011 02 03 21 09 55 31.3200 -97.3300 251.000 30.0 152.021 3.560 -999.990 -999.990 1.520 ..P WKT 2011 02 03 21 14 55 31.3200 -97.3300 251.000 122.0 148.128 2.200 -999.990 -999.990 1.481 ..P WKT 2011 02 03 21 19 55 31.3200 -97.3300 251.000 457.0 149.498 2.870 -999.990 -999.990 1.495 ..P WKT 2011 02 03 21 24 55 31.3200 -97.3300 251.000 30.0 152.974 2.520 -999.990 -999.990 1.530 ..P WKT 2011 02 03 21 29 55 31.3200 -97.3300 251.000 122.0 152.239 2.680 -999.990 -999.990 1.522 ..P WKT 2011 02 03 21 34 55 31.3200 -97.3300 251.000 457.0 150.188 2.320 -999.990 -999.990 1.502 ..P WKT 2011 02 03 21 44 55 31.3200 -97.3300 251.000 30.0 153.494 4.080 -999.990 -999.990 1.535 ..P WKT 2011 02 03 21 49 55 31.3200 -97.3300 251.000 122.0 152.006 2.750 -999.990 -999.990 1.520 ..P WKT 2011 02 03 21 54 55 31.3200 -97.3300 251.000 457.0 158.681 2.720 -999.990 -999.990 1.587 ..P WKT 2011 02 03 21 59 55 31.3200 -97.3300 251.000 30.0 155.088 3.070 -999.990 -999.990 1.551 ..P WKT 2011 02 03 22 04 55 31.3200 -97.3300 251.000 122.0 157.551 3.360 -999.990 -999.990 1.576 ..P WKT 2011 02 03 22 09 55 31.3200 -97.3300 251.000 457.0 156.327 4.250 -999.990 -999.990 1.563 ..P WKT 2011 02 03 22 19 55 31.3200 -97.3300 251.000 30.0 152.956 4.140 -999.990 -999.990 1.530 ..P WKT 2011 02 03 22 24 55 31.3200 -97.3300 251.000 122.0 157.922 3.100 -999.990 -999.990 1.579 ..P WKT 2011 02 03 22 29 55 31.3200 -97.3300 251.000 457.0 170.133 4.600 -999.990 -999.990 1.701 ..P WKT 2011 02 03 22 34 55 31.3200 -97.3300 251.000 30.0 159.293 3.630 -999.990 -999.990 1.593 ..P WKT 2011 02 03 22 39 55 31.3200 -97.3300 251.000 122.0 160.440 3.580 -999.990 -999.990 1.604 ..P WKT 2011 02 03 22 44 55 31.3200 -97.3300 251.000 457.0 165.803 3.520 -999.990 -999.990 1.658 ..P WKT 2011 02 03 22 54 55 31.3200 -97.3300 251.000 30.0 166.441 3.530 -999.990 -999.990 1.664 ..P WKT 2011 02 03 22 59 55 31.3200 -97.3300 251.000 122.0 160.661 3.520 -999.990 -999.990 1.607 ..P WKT 2011 02 03 23 04 55 31.3200 -97.3300 251.000 457.0 169.378 3.250 -999.990 -999.990 1.694 ..P WKT 2011 02 03 23 09 55 31.3200 -97.3300 251.000 30.0 160.038 3.220 -999.990 -999.990 1.600 ..P WKT 2011 02 03 23 14 55 31.3200 -97.3300 251.000 122.0 163.087 3.530 -999.990 -999.990 1.631 ..P WKT 2011 02 03 23 19 55 31.3200 -97.3300 251.000 457.0 157.041 3.280 -999.990 -999.990 1.570 ..P WKT 2011 02 03 23 29 55 31.3200 -97.3300 251.000 30.0 159.417 3.830 -999.990 -999.990 1.594 ..P WKT 2011 02 03 23 34 55 31.3200 -97.3300 251.000 122.0 159.929 5.730 -999.990 -999.990 1.599 ..P WKT 2011 02 03 23 39 55 31.3200 -97.3300 251.000 457.0 166.770 4.010 -999.990 -999.990 1.668 ..P WKT 2011 02 03 23 44 55 31.3200 -97.3300 251.000 30.0 162.931 3.720 -999.990 -999.990 1.629 ..P WKT 2011 02 03 23 49 55 31.3200 -97.3300 251.000 122.0 163.311 3.530 -999.990 -999.990 1.633 ..P WKT 2011 02 04 00 09 55 31.3200 -97.3300 251.000 457.0 160.244 3.770 -999.990 -999.990 1.602 ..P WKT 2011 02 04 00 10 25 31.3200 -97.3300 251.000 457.0 161.427 3.790 -999.990 -999.990 1.614 ..P WKT 2011 02 04 00 10 55 31.3200 -97.3300 251.000 457.0 156.411 3.760 -999.990 -999.990 1.564 ..P WKT 2011 02 04 00 11 25 31.3200 -97.3300 251.000 457.0 155.352 3.560 -999.990 -999.990 1.554 ..P WKT 2011 02 04 00 11 55 31.3200 -97.3300 251.000 457.0 159.171 4.110 -999.990 -999.990 1.592 ..P WKT 2011 02 04 00 12 25 31.3200 -97.3300 251.000 457.0 161.144 3.890 -999.990 -999.990 1.611 ..P WKT 2011 02 04 00 12 55 31.3200 -97.3300 251.000 457.0 163.908 5.350 -999.990 -999.990 1.639 ..P WKT 2011 02 04 00 13 25 31.3200 -97.3300 251.000 457.0 154.410 3.770 -999.990 -999.990 1.544 ..P WKT 2011 02 04 00 13 55 31.3200 -97.3300 251.000 457.0 157.570 3.780 -999.990 -999.990 1.576 ..P WKT 2011 02 04 00 14 25 31.3200 -97.3300 251.000 457.0 155.983 3.570 -999.990 -999.990 1.560 ..P WKT 2011 02 04 00 14 55 31.3200 -97.3300 251.000 457.0 157.824 4.060 -999.990 -999.990 1.578 ..P WKT 2011 02 04 00 19 55 31.3200 -97.3300 251.000 30.0 158.831 3.810 -999.990 -999.990 1.588 ..P WKT 2011 02 04 00 24 55 31.3200 -97.3300 251.000 122.0 162.211 3.480 -999.990 -999.990 1.622 ..P WKT 2011 02 04 00 29 55 31.3200 -97.3300 251.000 457.0 154.255 3.940 -999.990 -999.990 1.543 ..P WKT 2011 02 04 00 34 55 31.3200 -97.3300 251.000 30.0 161.061 3.420 -999.990 -999.990 1.611 ..P WKT 2011 02 04 00 39 55 31.3200 -97.3300 251.000 122.0 158.905 3.360 -999.990 -999.990 1.589 ..P WKT 2011 02 04 00 44 55 31.3200 -97.3300 251.000 457.0 151.480 3.540 -999.990 -999.990 1.515 ..P WKT 2011 02 04 00 54 55 31.3200 -97.3300 251.000 30.0 161.525 3.010 -999.990 -999.990 1.615 ..P WKT 2011 02 04 00 59 55 31.3200 -97.3300 251.000 122.0 160.551 2.770 -999.990 -999.990 1.606 ..P WKT 2011 02 04 01 04 55 31.3200 -97.3300 251.000 457.0 152.993 3.070 -999.990 -999.990 1.530 ..P WKT 2011 02 04 01 09 55 31.3200 -97.3300 251.000 30.0 160.711 2.650 -999.990 -999.990 1.607 ..P WKT 2011 02 04 01 14 55 31.3200 -97.3300 251.000 122.0 156.315 2.550 -999.990 -999.990 1.563 ..P WKT 2011 02 04 01 19 55 31.3200 -97.3300 251.000 457.0 159.290 2.610 -999.990 -999.990 1.593 ..P WKT 2011 02 04 01 29 55 31.3200 -97.3300 251.000 30.0 156.442 3.120 -999.990 -999.990 1.564 ..P WKT 2011 02 04 01 34 55 31.3200 -97.3300 251.000 122.0 152.989 2.860 -999.990 -999.990 1.530 ..P WKT 2011 02 04 01 39 55 31.3200 -97.3300 251.000 457.0 168.481 2.510 -999.990 -999.990 1.685 ..P WKT 2011 02 04 01 44 55 31.3200 -97.3300 251.000 30.0 159.239 3.330 -999.990 -999.990 1.592 ..P WKT 2011 02 04 01 49 55 31.3200 -97.3300 251.000 122.0 164.204 3.070 -999.990 -999.990 1.642 ..P WKT 2011 02 04 01 54 55 31.3200 -97.3300 251.000 457.0 162.593 2.530 -999.990 -999.990 1.626 ..P WKT 2011 02 04 02 04 55 31.3200 -97.3300 251.000 30.0 167.053 2.720 -999.990 -999.990 1.671 ..P WKT 2011 02 04 02 09 55 31.3200 -97.3300 251.000 122.0 169.968 2.670 -999.990 -999.990 1.700 ..P WKT 2011 02 04 02 14 55 31.3200 -97.3300 251.000 457.0 172.225 3.890 -999.990 -999.990 1.722 ..P WKT 2011 02 04 02 19 55 31.3200 -97.3300 251.000 30.0 165.149 5.430 -999.990 -999.990 1.651 ..P WKT 2011 02 04 02 24 55 31.3200 -97.3300 251.000 122.0 162.938 3.700 -999.990 -999.990 1.629 ..P WKT 2011 02 04 02 29 55 31.3200 -97.3300 251.000 457.0 172.947 3.090 -999.990 -999.990 1.729 ..P WKT 2011 02 04 02 39 55 31.3200 -97.3300 251.000 30.0 176.800 3.030 -999.990 -999.990 1.768 ..P WKT 2011 02 04 02 44 55 31.3200 -97.3300 251.000 122.0 174.457 4.540 -999.990 -999.990 1.745 ..P WKT 2011 02 04 02 49 55 31.3200 -97.3300 251.000 457.0 177.105 4.400 -999.990 -999.990 1.771 ..P WKT 2011 02 04 02 54 55 31.3200 -97.3300 251.000 30.0 171.743 3.530 -999.990 -999.990 1.717 ..P WKT 2011 02 04 02 59 55 31.3200 -97.3300 251.000 122.0 176.622 4.490 -999.990 -999.990 1.766 ..P WKT 2011 02 04 03 04 55 31.3200 -97.3300 251.000 457.0 170.474 2.970 -999.990 -999.990 1.705 ..P WKT 2011 02 04 03 14 55 31.3200 -97.3300 251.000 30.0 166.000 3.790 -999.990 -999.990 1.660 ..P WKT 2011 02 04 03 19 55 31.3200 -97.3300 251.000 122.0 167.147 4.880 -999.990 -999.990 1.671 ..P WKT 2011 02 04 03 24 55 31.3200 -97.3300 251.000 457.0 177.216 4.320 -999.990 -999.990 1.772 ..P WKT 2011 02 04 03 29 55 31.3200 -97.3300 251.000 30.0 164.062 3.310 -999.990 -999.990 1.641 ..P WKT 2011 02 04 03 34 55 31.3200 -97.3300 251.000 122.0 167.439 3.270 -999.990 -999.990 1.674 ..P WKT 2011 02 04 03 39 55 31.3200 -97.3300 251.000 457.0 176.324 3.880 -999.990 -999.990 1.763 ..P WKT 2011 02 04 03 49 55 31.3200 -97.3300 251.000 30.0 168.967 3.360 -999.990 -999.990 1.690 ..P WKT 2011 02 04 03 54 55 31.3200 -97.3300 251.000 122.0 166.368 3.610 -999.990 -999.990 1.664 ..P WKT 2011 02 04 03 59 55 31.3200 -97.3300 251.000 457.0 178.975 3.820 -999.990 -999.990 1.790 ..P WKT 2011 02 04 04 04 55 31.3200 -97.3300 251.000 30.0 166.150 3.190 -999.990 -999.990 1.662 ..P WKT 2011 02 04 04 09 55 31.3200 -97.3300 251.000 122.0 167.222 3.310 -999.990 -999.990 1.672 ..P WKT 2011 02 04 04 14 55 31.3200 -97.3300 251.000 457.0 176.809 4.320 -999.990 -999.990 1.768 ..P WKT 2011 02 04 04 24 55 31.3200 -97.3300 251.000 30.0 166.540 2.970 -999.990 -999.990 1.665 ..P WKT 2011 02 04 04 29 55 31.3200 -97.3300 251.000 122.0 168.565 2.760 -999.990 -999.990 1.686 ..P WKT 2011 02 04 04 34 55 31.3200 -97.3300 251.000 457.0 173.470 3.450 -999.990 -999.990 1.735 ..P WKT 2011 02 04 04 39 55 31.3200 -97.3300 251.000 30.0 163.708 4.060 -999.990 -999.990 1.637 ..P WKT 2011 02 04 04 44 55 31.3200 -97.3300 251.000 122.0 166.256 5.340 -999.990 -999.990 1.663 ..P WKT 2011 02 04 04 49 55 31.3200 -97.3300 251.000 457.0 181.372 3.710 -999.990 -999.990 1.814 ..P WKT 2011 02 04 05 04 55 31.3200 -97.3300 251.000 30.0 165.917 3.270 -999.990 -999.990 1.659 ..P WKT 2011 02 04 05 09 55 31.3200 -97.3300 251.000 122.0 163.201 3.700 -999.990 -999.990 1.632 ..P WKT 2011 02 04 05 14 55 31.3200 -97.3300 251.000 457.0 173.307 4.820 -999.990 -999.990 1.733 ..P WKT 2011 02 04 05 19 55 31.3200 -97.3300 251.000 30.0 157.509 4.490 -999.990 -999.990 1.575 ..P WKT 2011 02 04 05 24 55 31.3200 -97.3300 251.000 122.0 155.319 3.930 -999.990 -999.990 1.553 ..P WKT 2011 02 04 05 29 55 31.3200 -97.3300 251.000 457.0 167.515 3.910 -999.990 -999.990 1.675 ..P WKT 2011 02 04 05 39 55 31.3200 -97.3300 251.000 30.0 160.359 3.550 -999.990 -999.990 1.604 ..P WKT 2011 02 04 05 44 55 31.3200 -97.3300 251.000 122.0 152.258 4.510 -999.990 -999.990 1.523 ..P WKT 2011 02 04 05 49 55 31.3200 -97.3300 251.000 457.0 166.120 4.620 -999.990 -999.990 1.661 ..P WKT 2011 02 04 05 54 55 31.3200 -97.3300 251.000 30.0 160.111 4.040 -999.990 -999.990 1.601 ..P WKT 2011 02 04 05 59 55 31.3200 -97.3300 251.000 122.0 167.173 3.810 -999.990 -999.990 1.672 ..P WKT 2011 02 04 06 04 55 31.3200 -97.3300 251.000 457.0 172.403 3.360 -999.990 -999.990 1.724 ..P WKT 2011 02 04 06 14 55 31.3200 -97.3300 251.000 30.0 160.017 3.670 -999.990 -999.990 1.600 ..P WKT 2011 02 04 06 19 55 31.3200 -97.3300 251.000 122.0 159.519 3.230 -999.990 -999.990 1.595 ..P WKT 2011 02 04 06 24 55 31.3200 -97.3300 251.000 457.0 170.120 3.920 -999.990 -999.990 1.701 ..P WKT 2011 02 04 06 29 55 31.3200 -97.3300 251.000 30.0 158.129 3.810 -999.990 -999.990 1.581 ..P WKT 2011 02 04 06 34 55 31.3200 -97.3300 251.000 122.0 167.161 3.480 -999.990 -999.990 1.672 ..P WKT 2011 02 04 06 39 55 31.3200 -97.3300 251.000 457.0 163.920 3.110 -999.990 -999.990 1.639 ..P WKT 2011 02 04 06 49 55 31.3200 -97.3300 251.000 30.0 166.408 3.940 -999.990 -999.990 1.664 ..P WKT 2011 02 04 06 54 55 31.3200 -97.3300 251.000 122.0 162.087 3.080 -999.990 -999.990 1.621 ..P WKT 2011 02 04 06 59 55 31.3200 -97.3300 251.000 457.0 163.116 3.040 -999.990 -999.990 1.631 ..P WKT 2011 02 04 07 04 55 31.3200 -97.3300 251.000 30.0 149.012 3.230 -999.990 -999.990 1.490 ..P WKT 2011 02 04 07 09 55 31.3200 -97.3300 251.000 122.0 148.739 3.140 -999.990 -999.990 1.487 ..P WKT 2011 02 04 07 14 55 31.3200 -97.3300 251.000 457.0 163.986 4.490 -999.990 -999.990 1.640 ..P WKT 2011 02 04 07 24 55 31.3200 -97.3300 251.000 30.0 149.726 4.320 -999.990 -999.990 1.497 ..P WKT 2011 02 04 07 29 55 31.3200 -97.3300 251.000 122.0 148.130 4.240 -999.990 -999.990 1.481 ..P WKT 2011 02 04 07 34 55 31.3200 -97.3300 251.000 457.0 171.563 6.110 -999.990 -999.990 1.716 ..P WKT 2011 02 04 07 39 55 31.3200 -97.3300 251.000 30.0 147.546 5.320 -999.990 -999.990 1.475 ..P WKT 2011 02 04 07 44 55 31.3200 -97.3300 251.000 122.0 146.733 3.520 -999.990 -999.990 1.467 ..P WKT 2011 02 04 07 49 55 31.3200 -97.3300 251.000 457.0 174.718 4.330 -999.990 -999.990 1.747 ..P WKT 2011 02 04 07 59 55 31.3200 -97.3300 251.000 30.0 147.720 3.310 -999.990 -999.990 1.477 ..P WKT 2011 02 04 08 04 55 31.3200 -97.3300 251.000 122.0 142.256 3.150 -999.990 -999.990 1.423 ..P WKT 2011 02 04 08 09 55 31.3200 -97.3300 251.000 457.0 176.125 3.540 -999.990 -999.990 1.761 ..P WKT 2011 02 04 08 14 55 31.3200 -97.3300 251.000 30.0 144.614 3.860 -999.990 -999.990 1.446 ..P WKT 2011 02 04 08 19 55 31.3200 -97.3300 251.000 122.0 149.828 4.060 -999.990 -999.990 1.498 ..P WKT 2011 02 04 08 24 55 31.3200 -97.3300 251.000 457.0 175.352 5.240 -999.990 -999.990 1.754 ..P WKT 2011 02 04 08 34 55 31.3200 -97.3300 251.000 30.0 146.723 5.510 -999.990 -999.990 1.467 ..P WKT 2011 02 04 08 39 55 31.3200 -97.3300 251.000 122.0 155.839 4.360 -999.990 -999.990 1.558 ..P WKT 2011 02 04 08 44 55 31.3200 -97.3300 251.000 457.0 177.704 4.690 -999.990 -999.990 1.777 ..P WKT 2011 02 04 08 49 55 31.3200 -97.3300 251.000 30.0 161.313 4.600 -999.990 -999.990 1.613 ..P WKT 2011 02 04 08 54 55 31.3200 -97.3300 251.000 122.0 170.685 4.500 -999.990 -999.990 1.707 ..P WKT 2011 02 04 08 59 55 31.3200 -97.3300 251.000 457.0 182.134 4.740 -999.990 -999.990 1.821 ..P WKT 2011 02 04 09 09 55 31.3200 -97.3300 251.000 30.0 165.493 4.050 -999.990 -999.990 1.655 ..P WKT 2011 02 04 09 14 55 31.3200 -97.3300 251.000 122.0 163.416 3.940 -999.990 -999.990 1.634 ..P WKT 2011 02 04 09 19 55 31.3200 -97.3300 251.000 457.0 144.959 3.720 -999.990 -999.990 1.450 ..P WKT 2011 02 04 09 24 55 31.3200 -97.3300 251.000 30.0 165.244 4.320 -999.990 -999.990 1.652 ..P WKT 2011 02 04 09 29 55 31.3200 -97.3300 251.000 122.0 165.248 3.610 -999.990 -999.990 1.652 ..P WKT 2011 02 04 09 34 55 31.3200 -97.3300 251.000 457.0 164.472 4.380 -999.990 -999.990 1.645 ..P WKT 2011 02 04 09 44 55 31.3200 -97.3300 251.000 30.0 157.464 4.250 -999.990 -999.990 1.575 ..P WKT 2011 02 04 09 49 55 31.3200 -97.3300 251.000 122.0 156.950 3.300 -999.990 -999.990 1.569 ..P WKT 2011 02 04 09 54 55 31.3200 -97.3300 251.000 457.0 164.229 3.480 -999.990 -999.990 1.642 ..P WKT 2011 02 04 09 59 55 31.3200 -97.3300 251.000 30.0 156.441 3.640 -999.990 -999.990 1.564 ..P WKT 2011 02 04 10 04 55 31.3200 -97.3300 251.000 122.0 152.550 3.520 -999.990 -999.990 1.526 ..P WKT 2011 02 04 10 09 55 31.3200 -97.3300 251.000 457.0 151.128 3.750 -999.990 -999.990 1.511 ..P WKT 2011 02 04 10 19 55 31.3200 -97.3300 251.000 30.0 156.721 4.210 -999.990 -999.990 1.567 ..P WKT 2011 02 04 10 24 55 31.3200 -97.3300 251.000 122.0 157.114 3.830 -999.990 -999.990 1.571 ..P WKT 2011 02 04 10 29 55 31.3200 -97.3300 251.000 457.0 175.158 3.960 -999.990 -999.990 1.752 ..P WKT 2011 02 04 10 34 55 31.3200 -97.3300 251.000 30.0 158.552 3.860 -999.990 -999.990 1.586 ..P WKT 2011 02 04 10 39 55 31.3200 -97.3300 251.000 122.0 167.119 5.200 -999.990 -999.990 1.671 ..P WKT 2011 02 04 10 44 55 31.3200 -97.3300 251.000 457.0 160.637 4.070 -999.990 -999.990 1.606 ..P WKT 2011 02 04 10 54 55 31.3200 -97.3300 251.000 30.0 161.442 4.330 -999.990 -999.990 1.614 ..P WKT 2011 02 04 10 59 55 31.3200 -97.3300 251.000 122.0 166.911 4.110 -999.990 -999.990 1.669 ..P WKT 2011 02 04 11 04 55 31.3200 -97.3300 251.000 457.0 163.044 4.070 -999.990 -999.990 1.630 ..P WKT 2011 02 04 11 09 55 31.3200 -97.3300 251.000 30.0 160.474 3.890 -999.990 -999.990 1.605 ..P WKT 2011 02 04 11 14 55 31.3200 -97.3300 251.000 122.0 153.109 3.770 -999.990 -999.990 1.531 ..P WKT 2011 02 04 11 19 55 31.3200 -97.3300 251.000 457.0 160.909 4.050 -999.990 -999.990 1.609 ..P WKT 2011 02 04 11 29 55 31.3200 -97.3300 251.000 30.0 151.992 4.190 -999.990 -999.990 1.520 ..P WKT 2011 02 04 11 34 55 31.3200 -97.3300 251.000 122.0 152.252 4.040 -999.990 -999.990 1.523 ..P WKT 2011 02 04 11 39 55 31.3200 -97.3300 251.000 457.0 153.419 4.200 -999.990 -999.990 1.534 ..P WKT 2011 02 04 11 44 55 31.3200 -97.3300 251.000 30.0 152.902 4.490 -999.990 -999.990 1.529 ..P WKT 2011 02 04 11 49 55 31.3200 -97.3300 251.000 122.0 145.521 4.270 -999.990 -999.990 1.455 ..P WKT 2011 02 04 12 09 55 31.3200 -97.3300 251.000 457.0 149.102 4.170 -999.990 -999.990 1.491 ..P WKT 2011 02 04 12 10 25 31.3200 -97.3300 251.000 457.0 153.430 4.490 -999.990 -999.990 1.534 ..P WKT 2011 02 04 12 10 55 31.3200 -97.3300 251.000 457.0 156.203 4.230 -999.990 -999.990 1.562 ..P WKT 2011 02 04 12 11 25 31.3200 -97.3300 251.000 457.0 148.874 5.190 -999.990 -999.990 1.489 ..P WKT 2011 02 04 12 11 55 31.3200 -97.3300 251.000 457.0 153.721 4.880 -999.990 -999.990 1.537 ..P WKT 2011 02 04 12 12 25 31.3200 -97.3300 251.000 457.0 146.132 4.660 -999.990 -999.990 1.461 ..P WKT 2011 02 04 12 12 55 31.3200 -97.3300 251.000 457.0 145.538 4.120 -999.990 -999.990 1.455 ..P WKT 2011 02 04 12 13 25 31.3200 -97.3300 251.000 457.0 145.981 4.520 -999.990 -999.990 1.460 ..P WKT 2011 02 04 12 13 55 31.3200 -97.3300 251.000 457.0 146.164 5.640 -999.990 -999.990 1.462 ..P WKT 2011 02 04 12 14 25 31.3200 -97.3300 251.000 457.0 154.897 4.230 -999.990 -999.990 1.549 ..P WKT 2011 02 04 12 14 55 31.3200 -97.3300 251.000 457.0 155.339 4.230 -999.990 -999.990 1.553 ..P WKT 2011 02 04 12 19 55 31.3200 -97.3300 251.000 30.0 142.143 4.220 -999.990 -999.990 1.421 ..P WKT 2011 02 04 12 24 55 31.3200 -97.3300 251.000 122.0 147.863 4.800 -999.990 -999.990 1.479 ..P WKT 2011 02 04 12 29 55 31.3200 -97.3300 251.000 457.0 148.660 5.030 -999.990 -999.990 1.487 ..P WKT 2011 02 04 12 34 55 31.3200 -97.3300 251.000 30.0 138.566 4.740 -999.990 -999.990 1.386 ..P WKT 2011 02 04 12 39 55 31.3200 -97.3300 251.000 122.0 143.511 5.240 -999.990 -999.990 1.435 ..P WKT 2011 02 04 12 44 55 31.3200 -97.3300 251.000 457.0 142.232 4.260 -999.990 -999.990 1.422 ..P WKT 2011 02 04 12 54 55 31.3200 -97.3300 251.000 30.0 143.528 3.790 -999.990 -999.990 1.435 ..P WKT 2011 02 04 12 59 55 31.3200 -97.3300 251.000 122.0 141.951 4.560 -999.990 -999.990 1.420 ..P WKT 2011 02 04 13 04 55 31.3200 -97.3300 251.000 457.0 145.307 5.210 -999.990 -999.990 1.453 ..P WKT 2011 02 04 13 09 55 31.3200 -97.3300 251.000 30.0 142.172 4.500 -999.990 -999.990 1.422 ..P WKT 2011 02 04 13 14 55 31.3200 -97.3300 251.000 122.0 142.932 4.210 -999.990 -999.990 1.429 ..P WKT 2011 02 04 13 19 55 31.3200 -97.3300 251.000 457.0 141.354 4.170 -999.990 -999.990 1.414 ..P WKT 2011 02 04 13 29 55 31.3200 -97.3300 251.000 30.0 147.368 4.360 -999.990 -999.990 1.474 ..P WKT 2011 02 04 13 34 55 31.3200 -97.3300 251.000 122.0 147.944 4.380 -999.990 -999.990 1.479 ..P WKT 2011 02 04 13 39 55 31.3200 -97.3300 251.000 457.0 148.259 4.940 -999.990 -999.990 1.483 ..P WKT 2011 02 04 13 44 55 31.3200 -97.3300 251.000 30.0 143.635 4.280 -999.990 -999.990 1.436 ..P WKT 2011 02 04 13 49 55 31.3200 -97.3300 251.000 122.0 141.348 4.710 -999.990 -999.990 1.413 ..P WKT 2011 02 04 13 54 55 31.3200 -97.3300 251.000 457.0 140.362 4.650 -999.990 -999.990 1.404 ..P WKT 2011 02 04 14 04 55 31.3200 -97.3300 251.000 30.0 147.295 4.320 -999.990 -999.990 1.473 ..P WKT 2011 02 04 14 09 55 31.3200 -97.3300 251.000 122.0 141.549 4.330 -999.990 -999.990 1.415 ..P WKT 2011 02 04 14 14 55 31.3200 -97.3300 251.000 457.0 131.112 4.920 -999.990 -999.990 1.311 ..P WKT 2011 02 04 14 19 55 31.3200 -97.3300 251.000 30.0 146.719 4.750 -999.990 -999.990 1.467 ..P WKT 2011 02 04 14 24 55 31.3200 -97.3300 251.000 122.0 142.272 4.680 -999.990 -999.990 1.423 ..P WKT 2011 02 04 14 29 55 31.3200 -97.3300 251.000 457.0 130.135 4.090 -999.990 -999.990 1.301 ..P WKT 2011 02 04 14 39 55 31.3200 -97.3300 251.000 30.0 144.616 5.010 -999.990 -999.990 1.446 ..P WKT 2011 02 04 14 44 55 31.3200 -97.3300 251.000 122.0 137.482 4.590 -999.990 -999.990 1.375 ..P WKT 2011 02 04 14 49 55 31.3200 -97.3300 251.000 457.0 125.389 4.470 -999.990 -999.990 1.254 ..P WKT 2011 02 04 14 54 55 31.3200 -97.3300 251.000 30.0 139.770 4.490 -999.990 -999.990 1.398 ..P WKT 2011 02 04 14 59 55 31.3200 -97.3300 251.000 122.0 140.849 4.370 -999.990 -999.990 1.408 ..P WKT 2011 02 04 15 04 55 31.3200 -97.3300 251.000 457.0 135.927 4.560 -999.990 -999.990 1.359 ..P WKT 2011 02 04 15 14 55 31.3200 -97.3300 251.000 30.0 133.704 4.080 -999.990 -999.990 1.337 ..P WKT 2011 02 04 15 19 55 31.3200 -97.3300 251.000 122.0 132.881 4.120 -999.990 -999.990 1.329 ..P WKT 2011 02 04 15 24 55 31.3200 -97.3300 251.000 457.0 132.187 4.700 -999.990 -999.990 1.322 ..P WKT 2011 02 04 15 29 55 31.3200 -97.3300 251.000 30.0 133.453 4.370 -999.990 -999.990 1.335 ..P WKT 2011 02 04 15 34 55 31.3200 -97.3300 251.000 122.0 133.152 4.260 -999.990 -999.990 1.332 ..P WKT 2011 02 04 15 39 55 31.3200 -97.3300 251.000 457.0 132.328 4.340 -999.990 -999.990 1.323 ..P WKT 2011 02 04 15 49 55 31.3200 -97.3300 251.000 30.0 139.009 4.760 -999.990 -999.990 1.390 ..P WKT 2011 02 04 15 54 55 31.3200 -97.3300 251.000 122.0 136.056 5.000 -999.990 -999.990 1.361 ..P WKT 2011 02 04 15 59 55 31.3200 -97.3300 251.000 457.0 131.531 4.370 -999.990 -999.990 1.315 ..P WKT 2011 02 04 16 04 55 31.3200 -97.3300 251.000 30.0 131.977 4.320 -999.990 -999.990 1.320 ..P WKT 2011 02 04 16 09 55 31.3200 -97.3300 251.000 122.0 133.731 4.280 -999.990 -999.990 1.337 ..P WKT 2011 02 04 16 14 55 31.3200 -97.3300 251.000 457.0 134.177 4.910 -999.990 -999.990 1.342 ..P WKT 2011 02 04 16 24 55 31.3200 -97.3300 251.000 30.0 133.929 4.230 -999.990 -999.990 1.339 ..P WKT 2011 02 04 16 29 55 31.3200 -97.3300 251.000 122.0 130.353 4.710 -999.990 -999.990 1.304 ..P WKT 2011 02 04 16 34 55 31.3200 -97.3300 251.000 457.0 126.252 4.400 -999.990 -999.990 1.263 ..P WKT 2011 02 04 16 39 55 31.3200 -97.3300 251.000 30.0 130.534 4.470 -999.990 -999.990 1.305 ..P WKT 2011 02 04 16 44 55 31.3200 -97.3300 251.000 122.0 125.644 5.640 -999.990 -999.990 1.256 ..P WKT 2011 02 04 16 49 55 31.3200 -97.3300 251.000 457.0 134.385 5.510 -999.990 -999.990 1.344 ..P WKT 2011 02 04 17 04 55 31.3200 -97.3300 251.000 30.0 135.951 4.960 -999.990 -999.990 1.360 ..P WKT 2011 02 04 17 09 55 31.3200 -97.3300 251.000 122.0 132.360 5.590 -999.990 -999.990 1.324 ..P WKT 2011 02 04 17 14 55 31.3200 -97.3300 251.000 457.0 125.618 5.350 -999.990 -999.990 1.256 ..P WKT 2011 02 04 17 19 55 31.3200 -97.3300 251.000 30.0 127.273 5.380 -999.990 -999.990 1.273 ..P WKT 2011 02 04 17 24 55 31.3200 -97.3300 251.000 122.0 121.840 4.810 -999.990 -999.990 1.218 ..P WKT 2011 02 04 17 29 55 31.3200 -97.3300 251.000 457.0 127.960 4.650 -999.990 -999.990 1.280 ..P WKT 2011 02 04 17 39 55 31.3200 -97.3300 251.000 30.0 126.253 4.310 -999.990 -999.990 1.263 ..P WKT 2011 02 04 17 44 55 31.3200 -97.3300 251.000 122.0 120.524 5.380 -999.990 -999.990 1.205 ..P WKT 2011 02 04 17 49 55 31.3200 -97.3300 251.000 457.0 128.723 5.750 -999.990 -999.990 1.287 ..P WKT 2011 02 04 17 54 55 31.3200 -97.3300 251.000 30.0 124.570 4.790 -999.990 -999.990 1.246 ..P WKT 2011 02 04 17 59 55 31.3200 -97.3300 251.000 122.0 127.119 5.550 -999.990 -999.990 1.271 ..P WKT 2011 02 04 18 04 55 31.3200 -97.3300 251.000 457.0 132.694 4.410 -999.990 -999.990 1.327 ..P WKT 2011 02 04 18 14 55 31.3200 -97.3300 251.000 30.0 129.682 4.400 -999.990 -999.990 1.297 ..P WKT 2011 02 04 18 19 55 31.3200 -97.3300 251.000 122.0 132.009 4.890 -999.990 -999.990 1.320 ..P WKT 2011 02 04 18 24 55 31.3200 -97.3300 251.000 457.0 133.285 4.820 -999.990 -999.990 1.333 ..P WKT 2011 02 04 18 29 55 31.3200 -97.3300 251.000 30.0 130.085 4.790 -999.990 -999.990 1.301 ..P WKT 2011 02 04 18 34 55 31.3200 -97.3300 251.000 122.0 127.937 4.820 -999.990 -999.990 1.279 ..P WKT 2011 02 04 18 39 55 31.3200 -97.3300 251.000 457.0 127.238 4.470 -999.990 -999.990 1.272 ..P WKT 2011 02 04 18 49 55 31.3200 -97.3300 251.000 30.0 130.090 4.820 -999.990 -999.990 1.301 ..P WKT 2011 02 04 18 54 55 31.3200 -97.3300 251.000 122.0 133.909 4.460 -999.990 -999.990 1.339 ..P WKT 2011 02 04 18 59 55 31.3200 -97.3300 251.000 457.0 129.688 4.720 -999.990 -999.990 1.297 ..P WKT 2011 02 04 19 04 55 31.3200 -97.3300 251.000 30.0 120.720 5.430 -999.990 -999.990 1.207 ..P WKT 2011 02 04 19 09 55 31.3200 -97.3300 251.000 122.0 125.857 4.810 -999.990 -999.990 1.259 ..P WKT 2011 02 04 19 14 55 31.3200 -97.3300 251.000 457.0 125.062 4.490 -999.990 -999.990 1.251 ..P WKT 2011 02 04 19 24 55 31.3200 -97.3300 251.000 30.0 128.200 5.420 -999.990 -999.990 1.282 ..P WKT 2011 02 04 19 29 55 31.3200 -97.3300 251.000 122.0 130.158 4.850 -999.990 -999.990 1.302 ..P WKT 2011 02 04 19 34 55 31.3200 -97.3300 251.000 457.0 123.007 5.850 -999.990 -999.990 1.230 ..P WKT 2011 02 04 19 39 55 31.3200 -97.3300 251.000 30.0 124.171 4.720 -999.990 -999.990 1.242 ..P WKT 2011 02 04 19 44 55 31.3200 -97.3300 251.000 122.0 124.412 4.740 -999.990 -999.990 1.244 ..P WKT 2011 02 04 19 49 55 31.3200 -97.3300 251.000 457.0 123.332 5.870 -999.990 -999.990 1.233 ..P WKT 2011 02 04 19 59 55 31.3200 -97.3300 251.000 30.0 128.589 5.790 -999.990 -999.990 1.286 ..P WKT 2011 02 04 20 04 55 31.3200 -97.3300 251.000 122.0 119.201 4.690 -999.990 -999.990 1.192 ..P WKT 2011 02 04 20 09 55 31.3200 -97.3300 251.000 457.0 126.731 5.310 -999.990 -999.990 1.267 ..P WKT 2011 02 04 20 14 55 31.3200 -97.3300 251.000 30.0 122.363 5.270 -999.990 -999.990 1.224 ..P WKT 2011 02 04 20 19 55 31.3200 -97.3300 251.000 122.0 125.400 4.640 -999.990 -999.990 1.254 ..P WKT 2011 02 04 20 24 55 31.3200 -97.3300 251.000 457.0 126.322 4.610 -999.990 -999.990 1.263 ..P WKT 2011 02 04 20 34 55 31.3200 -97.3300 251.000 30.0 127.939 4.470 -999.990 -999.990 1.279 ..P WKT 2011 02 04 20 39 55 31.3200 -97.3300 251.000 122.0 131.547 4.830 -999.990 -999.990 1.315 ..P WKT 2011 02 04 20 44 55 31.3200 -97.3300 251.000 457.0 129.331 5.330 -999.990 -999.990 1.293 ..P WKT 2011 02 04 20 49 55 31.3200 -97.3300 251.000 30.0 133.205 5.860 -999.990 -999.990 1.332 ..P WKT 2011 02 04 20 54 55 31.3200 -97.3300 251.000 122.0 135.758 5.350 -999.990 -999.990 1.358 ..P WKT 2011 02 04 20 59 55 31.3200 -97.3300 251.000 457.0 136.456 4.920 -999.990 -999.990 1.365 ..P WKT 2011 02 04 21 09 55 31.3200 -97.3300 251.000 30.0 129.824 5.120 -999.990 -999.990 1.298 ..P WKT 2011 02 04 21 14 55 31.3200 -97.3300 251.000 122.0 124.877 6.800 -999.990 -999.990 1.249 ..P WKT 2011 02 04 21 19 55 31.3200 -97.3300 251.000 457.0 129.211 5.910 -999.990 -999.990 1.292 ..P WKT 2011 02 04 21 24 55 31.3200 -97.3300 251.000 30.0 123.467 5.420 -999.990 -999.990 1.235 ..P WKT 2011 02 04 21 29 55 31.3200 -97.3300 251.000 122.0 122.495 5.420 -999.990 -999.990 1.225 ..P WKT 2011 02 04 21 34 55 31.3200 -97.3300 251.000 457.0 122.319 5.080 -999.990 -999.990 1.223 ..P WKT 2011 02 04 21 44 55 31.3200 -97.3300 251.000 30.0 126.310 5.150 -999.990 -999.990 1.263 ..P WKT 2011 02 04 21 49 55 31.3200 -97.3300 251.000 122.0 128.886 5.550 -999.990 -999.990 1.289 ..P WKT 2011 02 04 21 54 55 31.3200 -97.3300 251.000 457.0 125.487 5.680 -999.990 -999.990 1.255 ..P WKT 2011 02 04 21 59 55 31.3200 -97.3300 251.000 30.0 128.860 5.300 -999.990 -999.990 1.289 ..P WKT 2011 02 04 22 04 55 31.3200 -97.3300 251.000 122.0 122.403 5.400 -999.990 -999.990 1.224 ..P WKT 2011 02 04 22 09 55 31.3200 -97.3300 251.000 457.0 125.512 5.950 -999.990 -999.990 1.255 ..P WKT 2011 02 04 22 19 55 31.3200 -97.3300 251.000 30.0 125.883 5.160 -999.990 -999.990 1.259 ..P WKT 2011 02 04 22 24 55 31.3200 -97.3300 251.000 122.0 128.063 5.160 -999.990 -999.990 1.281 ..P WKT 2011 02 04 22 29 55 31.3200 -97.3300 251.000 457.0 121.599 6.560 -999.990 -999.990 1.216 ..P WKT 2011 02 04 22 34 55 31.3200 -97.3300 251.000 30.0 124.976 5.190 -999.990 -999.990 1.250 ..P WKT 2011 02 04 22 39 55 31.3200 -97.3300 251.000 122.0 124.364 5.480 -999.990 -999.990 1.244 ..P WKT 2011 02 04 22 44 55 31.3200 -97.3300 251.000 457.0 127.211 4.850 -999.990 -999.990 1.272 ..P WKT 2011 02 04 22 54 55 31.3200 -97.3300 251.000 30.0 130.608 5.580 -999.990 -999.990 1.306 ..P WKT 2011 02 04 22 59 55 31.3200 -97.3300 251.000 122.0 125.563 5.550 -999.990 -999.990 1.256 ..P WKT 2011 02 04 23 04 55 31.3200 -97.3300 251.000 457.0 134.768 5.680 -999.990 -999.990 1.348 ..P WKT 2011 02 04 23 09 55 31.3200 -97.3300 251.000 30.0 123.460 6.160 -999.990 -999.990 1.235 ..P WKT 2011 02 04 23 14 55 31.3200 -97.3300 251.000 122.0 130.271 6.030 -999.990 -999.990 1.303 ..P WKT 2011 02 04 23 19 55 31.3200 -97.3300 251.000 457.0 134.018 6.370 -999.990 -999.990 1.340 ..P WKT 2011 02 04 23 29 55 31.3200 -97.3300 251.000 30.0 125.851 8.060 -999.990 -999.990 1.259 ..P WKT 2011 02 04 23 34 55 31.3200 -97.3300 251.000 122.0 135.136 6.310 -999.990 -999.990 1.351 ..P WKT 2011 02 04 23 39 55 31.3200 -97.3300 251.000 457.0 129.349 6.650 -999.990 -999.990 1.293 ..P WKT 2011 02 04 23 44 55 31.3200 -97.3300 251.000 30.0 133.434 6.800 -999.990 -999.990 1.334 ..P WKT 2011 02 04 23 49 55 31.3200 -97.3300 251.000 122.0 129.113 5.820 -999.990 -999.990 1.291 ..P WKT 2011 02 05 00 09 55 31.3200 -97.3300 251.000 457.0 130.236 5.580 -999.990 -999.990 1.302 ..P WKT 2011 02 05 00 10 25 31.3200 -97.3300 251.000 457.0 127.215 5.610 -999.990 -999.990 1.272 ..P WKT 2011 02 05 00 10 55 31.3200 -97.3300 251.000 457.0 130.870 5.570 -999.990 -999.990 1.309 ..P WKT 2011 02 05 00 11 25 31.3200 -97.3300 251.000 457.0 129.718 5.550 -999.990 -999.990 1.297 ..P WKT 2011 02 05 00 11 55 31.3200 -97.3300 251.000 457.0 131.503 5.530 -999.990 -999.990 1.315 ..P WKT 2011 02 05 00 12 25 31.3200 -97.3300 251.000 457.0 132.220 5.410 -999.990 -999.990 1.322 ..P WKT 2011 02 05 00 12 55 31.3200 -97.3300 251.000 457.0 130.534 5.240 -999.990 -999.990 1.305 ..P WKT 2011 02 05 00 13 25 31.3200 -97.3300 251.000 457.0 133.655 5.400 -999.990 -999.990 1.337 ..P WKT 2011 02 05 00 13 55 31.3200 -97.3300 251.000 457.0 135.173 5.670 -999.990 -999.990 1.352 ..P WKT 2011 02 05 00 14 25 31.3200 -97.3300 251.000 457.0 125.477 6.010 -999.990 -999.990 1.255 ..P WKT 2011 02 05 00 14 55 31.3200 -97.3300 251.000 457.0 125.660 7.060 -999.990 -999.990 1.257 ..P WKT 2011 02 05 00 19 55 31.3200 -97.3300 251.000 30.0 129.361 5.350 -999.990 -999.990 1.294 ..P WKT 2011 02 05 00 24 55 31.3200 -97.3300 251.000 122.0 126.120 5.790 -999.990 -999.990 1.261 ..P WKT 2011 02 05 00 29 55 31.3200 -97.3300 251.000 457.0 136.227 6.130 -999.990 -999.990 1.362 ..P WKT 2011 02 05 00 34 55 31.3200 -97.3300 251.000 30.0 130.050 6.470 -999.990 -999.990 1.301 ..P WKT 2011 02 05 00 39 55 31.3200 -97.3300 251.000 122.0 126.276 5.830 -999.990 -999.990 1.263 ..P WKT 2011 02 05 00 44 55 31.3200 -97.3300 251.000 457.0 127.840 5.280 -999.990 -999.990 1.278 ..P WKT 2011 02 05 00 54 55 31.3200 -97.3300 251.000 30.0 124.632 5.380 -999.990 -999.990 1.246 ..P WKT 2011 02 05 00 59 55 31.3200 -97.3300 251.000 122.0 128.665 5.830 -999.990 -999.990 1.287 ..P WKT 2011 02 05 01 04 55 31.3200 -97.3300 251.000 457.0 132.697 6.170 -999.990 -999.990 1.327 ..P WKT 2011 02 05 01 09 55 31.3200 -97.3300 251.000 30.0 138.597 6.150 -999.990 -999.990 1.386 ..P WKT 2011 02 05 01 14 55 31.3200 -97.3300 251.000 122.0 134.892 6.890 -999.990 -999.990 1.349 ..P WKT 2011 02 05 01 19 55 31.3200 -97.3300 251.000 457.0 130.655 5.330 -999.990 -999.990 1.307 ..P WKT 2011 02 05 01 29 55 31.3200 -97.3300 251.000 30.0 147.232 5.290 -999.990 -999.990 1.472 ..P WKT 2011 02 05 01 34 55 31.3200 -97.3300 251.000 122.0 137.908 6.200 -999.990 -999.990 1.379 ..P WKT 2011 02 05 01 39 55 31.3200 -97.3300 251.000 457.0 133.120 6.330 -999.990 -999.990 1.331 ..P WKT 2011 02 05 01 44 55 31.3200 -97.3300 251.000 30.0 136.597 7.070 -999.990 -999.990 1.366 ..P WKT 2011 02 05 01 49 55 31.3200 -97.3300 251.000 122.0 125.943 5.870 -999.990 -999.990 1.259 ..P WKT 2011 02 05 01 54 55 31.3200 -97.3300 251.000 457.0 123.956 5.360 -999.990 -999.990 1.240 ..P WKT 2011 02 05 02 04 55 31.3200 -97.3300 251.000 30.0 132.109 5.480 -999.990 -999.990 1.321 ..P WKT 2011 02 05 02 09 55 31.3200 -97.3300 251.000 122.0 133.987 5.980 -999.990 -999.990 1.340 ..P WKT 2011 02 05 02 14 55 31.3200 -97.3300 251.000 457.0 134.663 6.310 -999.990 -999.990 1.347 ..P WKT 2011 02 05 02 19 55 31.3200 -97.3300 251.000 30.0 137.206 6.400 -999.990 -999.990 1.372 ..P WKT 2011 02 05 02 24 55 31.3200 -97.3300 251.000 122.0 134.153 5.170 -999.990 -999.990 1.342 ..P WKT 2011 02 05 02 29 55 31.3200 -97.3300 251.000 457.0 135.496 5.830 -999.990 -999.990 1.355 ..P WKT 2011 02 05 02 39 55 31.3200 -97.3300 251.000 30.0 139.800 5.370 -999.990 -999.990 1.398 ..P WKT 2011 02 05 02 44 55 31.3200 -97.3300 251.000 122.0 136.500 5.520 -999.990 -999.990 1.365 ..P WKT 2011 02 05 02 49 55 31.3200 -97.3300 251.000 457.0 146.119 6.320 -999.990 -999.990 1.461 ..P WKT 2011 02 05 02 54 55 31.3200 -97.3300 251.000 30.0 141.221 6.840 -999.990 -999.990 1.412 ..P WKT 2011 02 05 02 59 55 31.3200 -97.3300 251.000 122.0 137.122 6.290 -999.990 -999.990 1.371 ..P WKT 2011 02 05 03 04 55 31.3200 -97.3300 251.000 457.0 139.017 5.620 -999.990 -999.990 1.390 ..P WKT 2011 02 05 03 14 55 31.3200 -97.3300 251.000 30.0 149.918 5.600 -999.990 -999.990 1.499 ..P WKT 2011 02 05 03 19 55 31.3200 -97.3300 251.000 122.0 142.149 6.610 -999.990 -999.990 1.421 ..P WKT 2011 02 05 03 24 55 31.3200 -97.3300 251.000 457.0 142.768 7.140 -999.990 -999.990 1.428 ..P WKT 2011 02 05 03 29 55 31.3200 -97.3300 251.000 30.0 153.503 6.380 -999.990 -999.990 1.535 ..P WKT 2011 02 05 03 34 55 31.3200 -97.3300 251.000 122.0 139.481 5.950 -999.990 -999.990 1.395 ..P WKT 2011 02 05 03 39 55 31.3200 -97.3300 251.000 457.0 135.709 5.380 -999.990 -999.990 1.357 ..P WKT 2011 02 05 03 49 55 31.3200 -97.3300 251.000 30.0 133.012 5.880 -999.990 -999.990 1.330 ..P WKT 2011 02 05 03 54 55 31.3200 -97.3300 251.000 122.0 135.817 5.930 -999.990 -999.990 1.358 ..P WKT 2011 02 05 03 59 55 31.3200 -97.3300 251.000 457.0 131.970 6.960 -999.990 -999.990 1.320 ..P WKT 2011 02 05 04 04 55 31.3200 -97.3300 251.000 30.0 134.509 5.700 -999.990 -999.990 1.345 ..P WKT 2011 02 05 04 09 55 31.3200 -97.3300 251.000 122.0 131.727 5.740 -999.990 -999.990 1.317 ..P WKT 2011 02 05 04 14 55 31.3200 -97.3300 251.000 457.0 133.466 5.210 -999.990 -999.990 1.335 ..P WKT 2011 02 05 04 24 55 31.3200 -97.3300 251.000 30.0 130.563 5.580 -999.990 -999.990 1.306 ..P WKT 2011 02 05 04 29 55 31.3200 -97.3300 251.000 122.0 138.687 5.710 -999.990 -999.990 1.387 ..P WKT 2011 02 05 04 34 55 31.3200 -97.3300 251.000 457.0 132.182 5.220 -999.990 -999.990 1.322 ..P WKT 2011 02 05 04 39 55 31.3200 -97.3300 251.000 30.0 139.240 5.950 -999.990 -999.990 1.392 ..P WKT 2011 02 05 04 44 55 31.3200 -97.3300 251.000 122.0 140.448 5.350 -999.990 -999.990 1.404 ..P WKT 2011 02 05 04 49 55 31.3200 -97.3300 251.000 457.0 135.539 5.530 -999.990 -999.990 1.355 ..P WKT 2011 02 05 05 04 55 31.3200 -97.3300 251.000 30.0 131.547 5.490 -999.990 -999.990 1.315 ..P WKT 2011 02 05 05 09 55 31.3200 -97.3300 251.000 122.0 133.998 5.510 -999.990 -999.990 1.340 ..P WKT 2011 02 05 05 14 55 31.3200 -97.3300 251.000 457.0 145.752 6.420 -999.990 -999.990 1.458 ..P WKT 2011 02 05 05 19 55 31.3200 -97.3300 251.000 30.0 136.508 5.880 -999.990 -999.990 1.365 ..P WKT 2011 02 05 05 24 55 31.3200 -97.3300 251.000 122.0 133.377 5.570 -999.990 -999.990 1.334 ..P WKT 2011 02 05 05 29 55 31.3200 -97.3300 251.000 457.0 138.485 6.120 -999.990 -999.990 1.385 ..P WKT 2011 02 05 05 39 55 31.3200 -97.3300 251.000 30.0 166.395 6.200 -999.990 -999.990 1.664 ..P WKT 2011 02 05 05 44 55 31.3200 -97.3300 251.000 122.0 138.982 6.190 -999.990 -999.990 1.390 ..P WKT 2011 02 05 05 49 55 31.3200 -97.3300 251.000 457.0 145.312 6.000 -999.990 -999.990 1.453 ..P WKT 2011 02 05 05 54 55 31.3200 -97.3300 251.000 30.0 166.649 6.770 -999.990 -999.990 1.666 ..P WKT 2011 02 05 05 59 55 31.3200 -97.3300 251.000 122.0 134.195 6.500 -999.990 -999.990 1.342 ..P WKT 2011 02 05 06 04 55 31.3200 -97.3300 251.000 457.0 132.688 6.030 -999.990 -999.990 1.327 ..P WKT 2011 02 05 06 14 55 31.3200 -97.3300 251.000 30.0 166.153 5.750 -999.990 -999.990 1.662 ..P WKT 2011 02 05 06 19 55 31.3200 -97.3300 251.000 122.0 142.832 6.340 -999.990 -999.990 1.428 ..P WKT 2011 02 05 06 24 55 31.3200 -97.3300 251.000 457.0 136.507 6.720 -999.990 -999.990 1.365 ..P WKT 2011 02 05 06 29 55 31.3200 -97.3300 251.000 30.0 174.391 6.130 -999.990 -999.990 1.744 ..P WKT 2011 02 05 06 34 55 31.3200 -97.3300 251.000 122.0 151.738 6.700 -999.990 -999.990 1.517 ..P WKT 2011 02 05 06 39 55 31.3200 -97.3300 251.000 457.0 134.796 5.650 -999.990 -999.990 1.348 ..P WKT 2011 02 05 06 49 55 31.3200 -97.3300 251.000 30.0 169.987 5.330 -999.990 -999.990 1.700 ..P WKT 2011 02 05 06 54 55 31.3200 -97.3300 251.000 122.0 142.886 6.120 -999.990 -999.990 1.429 ..P WKT 2011 02 05 06 59 55 31.3200 -97.3300 251.000 457.0 137.949 6.010 -999.990 -999.990 1.379 ..P WKT 2011 02 05 07 04 55 31.3200 -97.3300 251.000 30.0 166.582 5.800 -999.990 -999.990 1.666 ..P WKT 2011 02 05 07 09 55 31.3200 -97.3300 251.000 122.0 139.620 5.670 -999.990 -999.990 1.396 ..P WKT 2011 02 05 07 14 55 31.3200 -97.3300 251.000 457.0 139.592 5.440 -999.990 -999.990 1.396 ..P WKT 2011 02 05 07 24 55 31.3200 -97.3300 251.000 30.0 180.431 5.810 -999.990 -999.990 1.804 ..P WKT 2011 02 05 07 29 55 31.3200 -97.3300 251.000 122.0 144.096 5.570 -999.990 -999.990 1.441 ..P WKT 2011 02 05 07 34 55 31.3200 -97.3300 251.000 457.0 130.313 5.850 -999.990 -999.990 1.303 ..P WKT 2011 02 05 07 39 55 31.3200 -97.3300 251.000 30.0 180.189 5.850 -999.990 -999.990 1.802 ..P WKT 2011 02 05 07 44 55 31.3200 -97.3300 251.000 122.0 152.349 5.140 -999.990 -999.990 1.523 ..P WKT 2011 02 05 07 49 55 31.3200 -97.3300 251.000 457.0 130.082 4.940 -999.990 -999.990 1.301 ..P WKT 2011 02 05 07 59 55 31.3200 -97.3300 251.000 30.0 179.064 5.320 -999.990 -999.990 1.791 ..P WKT 2011 02 05 08 04 55 31.3200 -97.3300 251.000 122.0 140.267 5.590 -999.990 -999.990 1.403 ..P WKT 2011 02 05 08 09 55 31.3200 -97.3300 251.000 457.0 142.304 5.130 -999.990 -999.990 1.423 ..P WKT 2011 02 05 08 14 55 31.3200 -97.3300 251.000 30.0 169.525 5.130 -999.990 -999.990 1.695 ..P WKT 2011 02 05 08 19 55 31.3200 -97.3300 251.000 122.0 143.727 5.140 -999.990 -999.990 1.437 ..P WKT 2011 02 05 08 24 55 31.3200 -97.3300 251.000 457.0 131.715 5.300 -999.990 -999.990 1.317 ..P WKT 2011 02 05 08 34 55 31.3200 -97.3300 251.000 30.0 154.870 5.970 -999.990 -999.990 1.549 ..P WKT 2011 02 05 08 39 55 31.3200 -97.3300 251.000 122.0 141.800 5.200 -999.990 -999.990 1.418 ..P WKT 2011 02 05 08 44 55 31.3200 -97.3300 251.000 457.0 138.800 5.430 -999.990 -999.990 1.388 ..P WKT 2011 02 05 08 49 55 31.3200 -97.3300 251.000 30.0 150.905 5.610 -999.990 -999.990 1.509 ..P WKT 2011 02 05 08 54 55 31.3200 -97.3300 251.000 122.0 139.163 5.690 -999.990 -999.990 1.392 ..P WKT 2011 02 05 08 59 55 31.3200 -97.3300 251.000 457.0 133.250 5.660 -999.990 -999.990 1.333 ..P WKT 2011 02 05 09 09 55 31.3200 -97.3300 251.000 30.0 148.635 5.680 -999.990 -999.990 1.486 ..P WKT 2011 02 05 09 14 55 31.3200 -97.3300 251.000 122.0 136.557 5.490 -999.990 -999.990 1.366 ..P WKT 2011 02 05 09 19 55 31.3200 -97.3300 251.000 457.0 136.397 5.330 -999.990 -999.990 1.364 ..P WKT 2011 02 05 09 24 55 31.3200 -97.3300 251.000 30.0 147.360 8.080 -999.990 -999.990 1.474 ..P WKT 2011 02 05 09 29 55 31.3200 -97.3300 251.000 122.0 137.668 5.380 -999.990 -999.990 1.377 ..P WKT 2011 02 05 09 34 55 31.3200 -97.3300 251.000 457.0 129.829 5.420 -999.990 -999.990 1.298 ..P WKT 2011 02 05 09 44 55 31.3200 -97.3300 251.000 30.0 143.637 5.040 -999.990 -999.990 1.436 ..P WKT 2011 02 05 09 49 55 31.3200 -97.3300 251.000 122.0 138.013 5.300 -999.990 -999.990 1.380 ..P WKT 2011 02 05 09 54 55 31.3200 -97.3300 251.000 457.0 136.360 5.660 -999.990 -999.990 1.364 ..P WKT 2011 02 05 09 59 55 31.3200 -97.3300 251.000 30.0 148.471 5.330 -999.990 -999.990 1.485 ..P WKT 2011 02 05 10 04 55 31.3200 -97.3300 251.000 122.0 136.627 5.440 -999.990 -999.990 1.366 ..P WKT 2011 02 05 10 09 55 31.3200 -97.3300 251.000 457.0 133.916 5.380 -999.990 -999.990 1.339 ..P WKT 2011 02 05 10 19 55 31.3200 -97.3300 251.000 30.0 144.334 5.190 -999.990 -999.990 1.443 ..P WKT 2011 02 05 10 24 55 31.3200 -97.3300 251.000 122.0 136.558 6.060 -999.990 -999.990 1.366 ..P WKT 2011 02 05 10 29 55 31.3200 -97.3300 251.000 457.0 138.440 5.070 -999.990 -999.990 1.384 ..P WKT 2011 02 05 10 34 55 31.3200 -97.3300 251.000 30.0 153.946 5.800 -999.990 -999.990 1.539 ..P WKT 2011 02 05 10 39 55 31.3200 -97.3300 251.000 122.0 136.515 5.400 -999.990 -999.990 1.365 ..P WKT 2011 02 05 10 44 55 31.3200 -97.3300 251.000 457.0 136.809 5.640 -999.990 -999.990 1.368 ..P WKT 2011 02 05 10 54 55 31.3200 -97.3300 251.000 30.0 147.939 6.040 -999.990 -999.990 1.479 ..P WKT 2011 02 05 10 59 55 31.3200 -97.3300 251.000 122.0 139.468 5.040 -999.990 -999.990 1.395 ..P WKT 2011 02 05 11 04 55 31.3200 -97.3300 251.000 457.0 129.147 5.250 -999.990 -999.990 1.291 ..P WKT 2011 02 05 11 09 55 31.3200 -97.3300 251.000 30.0 141.963 5.840 -999.990 -999.990 1.420 ..P WKT 2011 02 05 11 14 55 31.3200 -97.3300 251.000 122.0 139.840 6.460 -999.990 -999.990 1.398 ..P WKT 2011 02 05 11 19 55 31.3200 -97.3300 251.000 457.0 122.515 5.420 -999.990 -999.990 1.225 ..P WKT 2011 02 05 11 29 55 31.3200 -97.3300 251.000 30.0 148.836 5.470 -999.990 -999.990 1.488 ..P WKT 2011 02 05 11 34 55 31.3200 -97.3300 251.000 122.0 141.459 5.920 -999.990 -999.990 1.415 ..P WKT 2011 02 05 11 39 55 31.3200 -97.3300 251.000 457.0 122.190 5.490 -999.990 -999.990 1.222 ..P WKT 2011 02 05 11 44 55 31.3200 -97.3300 251.000 30.0 144.944 5.630 -999.990 -999.990 1.449 ..P WKT 2011 02 05 11 49 55 31.3200 -97.3300 251.000 122.0 141.797 5.920 -999.990 -999.990 1.418 ..P WKT 2011 02 05 12 09 55 31.3200 -97.3300 251.000 457.0 123.572 5.150 -999.990 -999.990 1.236 ..P WKT 2011 02 05 12 10 25 31.3200 -97.3300 251.000 457.0 130.186 5.490 -999.990 -999.990 1.302 ..P WKT 2011 02 05 12 10 55 31.3200 -97.3300 251.000 457.0 131.766 5.380 -999.990 -999.990 1.318 ..P WKT 2011 02 05 12 11 25 31.3200 -97.3300 251.000 457.0 126.190 5.360 -999.990 -999.990 1.262 ..P WKT 2011 02 05 12 11 55 31.3200 -97.3300 251.000 457.0 121.142 4.960 -999.990 -999.990 1.211 ..P WKT 2011 02 05 12 12 25 31.3200 -97.3300 251.000 457.0 120.070 4.970 -999.990 -999.990 1.201 ..P WKT 2011 02 05 12 12 55 31.3200 -97.3300 251.000 457.0 123.241 5.010 -999.990 -999.990 1.232 ..P WKT 2011 02 05 12 13 25 31.3200 -97.3300 251.000 457.0 123.230 5.130 -999.990 -999.990 1.232 ..P WKT 2011 02 05 12 13 55 31.3200 -97.3300 251.000 457.0 122.689 5.590 -999.990 -999.990 1.227 ..P WKT 2011 02 05 12 14 25 31.3200 -97.3300 251.000 457.0 117.902 5.460 -999.990 -999.990 1.179 ..P WKT 2011 02 05 12 14 55 31.3200 -97.3300 251.000 457.0 123.463 5.110 -999.990 -999.990 1.235 ..P WKT 2011 02 05 12 19 55 31.3200 -97.3300 251.000 30.0 149.399 4.980 -999.990 -999.990 1.494 ..P WKT 2011 02 05 12 24 55 31.3200 -97.3300 251.000 122.0 139.215 4.930 -999.990 -999.990 1.392 ..P WKT 2011 02 05 12 29 55 31.3200 -97.3300 251.000 457.0 125.267 4.810 -999.990 -999.990 1.253 ..P WKT 2011 02 05 12 34 55 31.3200 -97.3300 251.000 30.0 147.318 5.650 -999.990 -999.990 1.473 ..P WKT 2011 02 05 12 39 55 31.3200 -97.3300 251.000 122.0 136.282 4.970 -999.990 -999.990 1.363 ..P WKT 2011 02 05 12 44 55 31.3200 -97.3300 251.000 457.0 128.427 4.980 -999.990 -999.990 1.284 ..P WKT 2011 02 05 12 54 55 31.3200 -97.3300 251.000 30.0 145.393 4.950 -999.990 -999.990 1.454 ..P WKT 2011 02 05 12 59 55 31.3200 -97.3300 251.000 122.0 137.499 5.190 -999.990 -999.990 1.375 ..P WKT 2011 02 05 13 04 55 31.3200 -97.3300 251.000 457.0 127.694 4.360 -999.990 -999.990 1.277 ..P WKT 2011 02 05 13 09 55 31.3200 -97.3300 251.000 30.0 144.300 4.430 -999.990 -999.990 1.443 ..P WKT 2011 02 05 13 14 55 31.3200 -97.3300 251.000 122.0 137.989 4.450 -999.990 -999.990 1.380 ..P WKT 2011 02 05 13 19 55 31.3200 -97.3300 251.000 457.0 126.789 4.770 -999.990 -999.990 1.268 ..P WKT 2011 02 05 13 29 55 31.3200 -97.3300 251.000 30.0 145.833 4.520 -999.990 -999.990 1.458 ..P WKT 2011 02 05 13 34 55 31.3200 -97.3300 251.000 122.0 133.796 4.250 -999.990 -999.990 1.338 ..P WKT 2011 02 05 13 39 55 31.3200 -97.3300 251.000 457.0 132.614 4.630 -999.990 -999.990 1.326 ..P WKT 2011 02 05 13 44 55 31.3200 -97.3300 251.000 30.0 151.060 5.050 -999.990 -999.990 1.511 ..P WKT 2011 02 05 13 49 55 31.3200 -97.3300 251.000 122.0 139.522 4.840 -999.990 -999.990 1.395 ..P WKT 2011 02 05 13 54 55 31.3200 -97.3300 251.000 457.0 133.556 4.810 -999.990 -999.990 1.336 ..P WKT 2011 02 05 14 04 55 31.3200 -97.3300 251.000 30.0 144.890 4.790 -999.990 -999.990 1.449 ..P WKT 2011 02 05 14 09 55 31.3200 -97.3300 251.000 122.0 140.691 4.740 -999.990 -999.990 1.407 ..P WKT 2011 02 05 14 14 55 31.3200 -97.3300 251.000 457.0 130.974 4.640 -999.990 -999.990 1.310 ..P WKT 2011 02 05 14 19 55 31.3200 -97.3300 251.000 30.0 150.584 5.850 -999.990 -999.990 1.506 ..P WKT 2011 02 05 14 24 55 31.3200 -97.3300 251.000 122.0 133.123 5.330 -999.990 -999.990 1.331 ..P WKT 2011 02 05 14 29 55 31.3200 -97.3300 251.000 457.0 125.699 4.760 -999.990 -999.990 1.257 ..P WKT 2011 02 05 14 39 55 31.3200 -97.3300 251.000 30.0 145.096 5.840 -999.990 -999.990 1.451 ..P WKT 2011 02 05 14 44 55 31.3200 -97.3300 251.000 122.0 144.106 5.090 -999.990 -999.990 1.441 ..P WKT 2011 02 05 14 49 55 31.3200 -97.3300 251.000 457.0 132.261 4.840 -999.990 -999.990 1.323 ..P WKT 2011 02 05 14 54 55 31.3200 -97.3300 251.000 30.0 142.951 4.840 -999.990 -999.990 1.430 ..P WKT 2011 02 05 14 59 55 31.3200 -97.3300 251.000 122.0 141.952 5.190 -999.990 -999.990 1.420 ..P WKT 2011 02 05 15 04 55 31.3200 -97.3300 251.000 457.0 133.403 5.430 -999.990 -999.990 1.334 ..P WKT 2011 02 05 15 14 55 31.3200 -97.3300 251.000 30.0 155.762 6.390 -999.990 -999.990 1.558 ..P WKT 2011 02 05 15 19 55 31.3200 -97.3300 251.000 122.0 147.194 5.550 -999.990 -999.990 1.472 ..P WKT 2011 02 05 15 24 55 31.3200 -97.3300 251.000 457.0 127.910 4.680 -999.990 -999.990 1.279 ..P WKT 2011 02 05 15 29 55 31.3200 -97.3300 251.000 30.0 148.150 5.210 -999.990 -999.990 1.482 ..P WKT 2011 02 05 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 02 05 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 02 05 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 02 05 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 02 05 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 02 05 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 02 05 18 14 55 31.3200 -97.3300 251.000 30.0 128.179 3.440 -999.990 -999.990 1.282 ..P WKT 2011 02 05 18 19 55 31.3200 -97.3300 251.000 122.0 123.496 4.160 -999.990 -999.990 1.235 ..P WKT 2011 02 05 18 24 55 31.3200 -97.3300 251.000 457.0 116.858 4.590 -999.990 -999.990 1.169 ..P WKT 2011 02 05 18 29 55 31.3200 -97.3300 251.000 30.0 126.029 5.350 -999.990 -999.990 1.260 ..P WKT 2011 02 05 18 34 55 31.3200 -97.3300 251.000 122.0 118.925 4.950 -999.990 -999.990 1.189 ..P WKT 2011 02 05 18 39 55 31.3200 -97.3300 251.000 457.0 103.555 3.420 -999.990 -999.990 1.036 ..P WKT 2011 02 05 18 49 55 31.3200 -97.3300 251.000 30.0 124.168 3.590 -999.990 -999.990 1.242 ..P WKT 2011 02 05 18 54 55 31.3200 -97.3300 251.000 122.0 124.930 5.210 -999.990 -999.990 1.249 ..P WKT 2011 02 05 18 59 55 31.3200 -97.3300 251.000 457.0 114.380 5.150 -999.990 -999.990 1.144 ..P WKT 2011 02 05 19 04 55 31.3200 -97.3300 251.000 30.0 123.440 4.430 -999.990 -999.990 1.234 ..P WKT 2011 02 05 19 09 55 31.3200 -97.3300 251.000 122.0 127.232 3.590 -999.990 -999.990 1.272 ..P WKT 2011 02 05 19 14 55 31.3200 -97.3300 251.000 457.0 119.968 2.610 -999.990 -999.990 1.200 ..P WKT 2011 02 05 19 24 55 31.3200 -97.3300 251.000 30.0 125.755 3.510 -999.990 -999.990 1.258 ..P WKT 2011 02 05 19 29 55 31.3200 -97.3300 251.000 122.0 126.529 3.350 -999.990 -999.990 1.265 ..P WKT 2011 02 05 19 34 55 31.3200 -97.3300 251.000 457.0 122.268 3.830 -999.990 -999.990 1.223 ..P WKT 2011 02 05 19 39 55 31.3200 -97.3300 251.000 30.0 115.699 4.190 -999.990 -999.990 1.157 ..P WKT 2011 02 05 19 44 55 31.3200 -97.3300 251.000 122.0 117.991 3.680 -999.990 -999.990 1.180 ..P WKT 2011 02 05 19 49 55 31.3200 -97.3300 251.000 457.0 119.985 2.860 -999.990 -999.990 1.200 ..P WKT 2011 02 05 19 59 55 31.3200 -97.3300 251.000 30.0 122.366 3.120 -999.990 -999.990 1.224 ..P WKT 2011 02 05 20 04 55 31.3200 -97.3300 251.000 122.0 120.588 3.520 -999.990 -999.990 1.206 ..P WKT 2011 02 05 20 09 55 31.3200 -97.3300 251.000 457.0 124.366 4.100 -999.990 -999.990 1.244 ..P WKT 2011 02 05 20 14 55 31.3200 -97.3300 251.000 30.0 122.585 3.710 -999.990 -999.990 1.226 ..P WKT 2011 02 05 20 19 55 31.3200 -97.3300 251.000 122.0 130.410 2.770 -999.990 -999.990 1.304 ..P WKT 2011 02 05 20 24 55 31.3200 -97.3300 251.000 457.0 121.800 2.840 -999.990 -999.990 1.218 ..P WKT 2011 02 05 20 34 55 31.3200 -97.3300 251.000 30.0 129.337 2.870 -999.990 -999.990 1.293 ..P WKT 2011 02 05 20 39 55 31.3200 -97.3300 251.000 122.0 129.021 4.720 -999.990 -999.990 1.290 ..P WKT 2011 02 05 20 44 55 31.3200 -97.3300 251.000 457.0 129.643 3.660 -999.990 -999.990 1.296 ..P WKT 2011 02 05 20 49 55 31.3200 -97.3300 251.000 30.0 132.460 2.920 -999.990 -999.990 1.325 ..P WKT 2011 02 05 20 54 55 31.3200 -97.3300 251.000 122.0 129.009 2.790 -999.990 -999.990 1.290 ..P WKT 2011 02 05 20 59 55 31.3200 -97.3300 251.000 457.0 124.917 3.480 -999.990 -999.990 1.249 ..P WKT 2011 02 05 21 09 55 31.3200 -97.3300 251.000 30.0 127.644 2.560 -999.990 -999.990 1.276 ..P WKT 2011 02 05 21 14 55 31.3200 -97.3300 251.000 122.0 128.812 2.330 -999.990 -999.990 1.288 ..P WKT 2011 02 05 21 19 55 31.3200 -97.3300 251.000 457.0 130.933 2.310 -999.990 -999.990 1.309 ..P WKT 2011 02 05 21 24 55 31.3200 -97.3300 251.000 30.0 130.525 3.510 -999.990 -999.990 1.305 ..P WKT 2011 02 05 21 29 55 31.3200 -97.3300 251.000 122.0 130.750 2.510 -999.990 -999.990 1.308 ..P WKT 2011 02 05 21 34 55 31.3200 -97.3300 251.000 457.0 133.205 2.350 -999.990 -999.990 1.332 ..P WKT 2011 02 05 21 44 55 31.3200 -97.3300 251.000 30.0 132.847 2.010 -999.990 -999.990 1.328 ..P WKT 2011 02 05 21 49 55 31.3200 -97.3300 251.000 122.0 135.135 2.910 -999.990 -999.990 1.351 ..P WKT 2011 02 05 21 54 55 31.3200 -97.3300 251.000 457.0 131.821 2.960 -999.990 -999.990 1.318 ..P WKT 2011 02 05 21 59 55 31.3200 -97.3300 251.000 30.0 133.474 3.130 -999.990 -999.990 1.335 ..P WKT 2011 02 05 22 04 55 31.3200 -97.3300 251.000 122.0 129.340 2.650 -999.990 -999.990 1.293 ..P WKT 2011 02 05 22 09 55 31.3200 -97.3300 251.000 457.0 130.189 2.400 -999.990 -999.990 1.302 ..P WKT 2011 02 05 22 19 55 31.3200 -97.3300 251.000 30.0 125.355 1.750 -999.990 -999.990 1.254 ..P WKT 2011 02 05 22 24 55 31.3200 -97.3300 251.000 122.0 129.535 2.490 -999.990 -999.990 1.295 ..P WKT 2011 02 05 22 29 55 31.3200 -97.3300 251.000 457.0 131.294 2.560 -999.990 -999.990 1.313 ..P WKT 2011 02 05 22 34 55 31.3200 -97.3300 251.000 30.0 128.343 2.210 -999.990 -999.990 1.283 ..P WKT 2011 02 05 22 39 55 31.3200 -97.3300 251.000 122.0 140.372 3.710 -999.990 -999.990 1.404 ..P WKT 2011 02 05 22 44 55 31.3200 -97.3300 251.000 457.0 132.856 4.510 -999.990 -999.990 1.329 ..P WKT 2011 02 05 22 54 55 31.3200 -97.3300 251.000 30.0 133.377 1.840 -999.990 -999.990 1.334 ..P WKT 2011 02 05 22 59 55 31.3200 -97.3300 251.000 122.0 133.099 2.200 -999.990 -999.990 1.331 ..P WKT 2011 02 05 23 04 55 31.3200 -97.3300 251.000 457.0 128.545 2.270 -999.990 -999.990 1.285 ..P WKT 2011 02 05 23 09 55 31.3200 -97.3300 251.000 30.0 133.035 3.060 -999.990 -999.990 1.330 ..P WKT 2011 02 05 23 14 55 31.3200 -97.3300 251.000 122.0 126.319 1.890 -999.990 -999.990 1.263 ..P WKT 2011 02 05 23 19 55 31.3200 -97.3300 251.000 457.0 125.531 3.290 -999.990 -999.990 1.255 ..P WKT 2011 02 05 23 29 55 31.3200 -97.3300 251.000 30.0 131.712 2.060 -999.990 -999.990 1.317 ..P WKT 2011 02 05 23 34 55 31.3200 -97.3300 251.000 122.0 126.407 1.920 -999.990 -999.990 1.264 ..P WKT 2011 02 05 23 39 55 31.3200 -97.3300 251.000 457.0 126.746 2.750 -999.990 -999.990 1.267 ..P WKT 2011 02 05 23 44 55 31.3200 -97.3300 251.000 30.0 128.087 2.730 -999.990 -999.990 1.281 ..P WKT 2011 02 05 23 49 55 31.3200 -97.3300 251.000 122.0 134.116 2.380 -999.990 -999.990 1.341 ..P WKT 2011 02 06 00 09 55 31.3200 -97.3300 251.000 457.0 126.234 2.690 -999.990 -999.990 1.262 ..P WKT 2011 02 06 00 10 25 31.3200 -97.3300 251.000 457.0 126.250 2.280 -999.990 -999.990 1.262 ..P WKT 2011 02 06 00 10 55 31.3200 -97.3300 251.000 457.0 123.580 2.470 -999.990 -999.990 1.236 ..P WKT 2011 02 06 00 11 25 31.3200 -97.3300 251.000 457.0 129.303 1.820 -999.990 -999.990 1.293 ..P WKT 2011 02 06 00 11 55 31.3200 -97.3300 251.000 457.0 130.998 5.030 -999.990 -999.990 1.310 ..P WKT 2011 02 06 00 12 25 31.3200 -97.3300 251.000 457.0 118.592 3.670 -999.990 -999.990 1.186 ..P WKT 2011 02 06 00 12 55 31.3200 -97.3300 251.000 457.0 126.664 1.700 -999.990 -999.990 1.267 ..P WKT 2011 02 06 00 13 25 31.3200 -97.3300 251.000 457.0 127.687 2.510 -999.990 -999.990 1.277 ..P WKT 2011 02 06 00 13 55 31.3200 -97.3300 251.000 457.0 131.732 1.750 -999.990 -999.990 1.317 ..P WKT 2011 02 06 00 14 25 31.3200 -97.3300 251.000 457.0 126.712 4.460 -999.990 -999.990 1.267 ..P WKT 2011 02 06 00 14 55 31.3200 -97.3300 251.000 457.0 125.721 1.720 -999.990 -999.990 1.257 ..P WKT 2011 02 06 00 19 55 31.3200 -97.3300 251.000 30.0 129.236 2.460 -999.990 -999.990 1.292 ..P WKT 2011 02 06 00 24 55 31.3200 -97.3300 251.000 122.0 126.708 2.020 -999.990 -999.990 1.267 ..P WKT 2011 02 06 00 29 55 31.3200 -97.3300 251.000 457.0 131.902 2.140 -999.990 -999.990 1.319 ..P WKT 2011 02 06 00 34 55 31.3200 -97.3300 251.000 30.0 129.374 2.120 -999.990 -999.990 1.294 ..P WKT 2011 02 06 00 39 55 31.3200 -97.3300 251.000 122.0 134.568 2.400 -999.990 -999.990 1.346 ..P WKT 2011 02 06 00 44 55 31.3200 -97.3300 251.000 457.0 131.033 4.440 -999.990 -999.990 1.310 ..P WKT 2011 02 06 00 54 55 31.3200 -97.3300 251.000 30.0 142.950 2.560 -999.990 -999.990 1.429 ..P WKT 2011 02 06 00 59 55 31.3200 -97.3300 251.000 122.0 134.566 2.900 -999.990 -999.990 1.346 ..P WKT 2011 02 06 01 04 55 31.3200 -97.3300 251.000 457.0 129.539 2.420 -999.990 -999.990 1.295 ..P WKT 2011 02 06 01 09 55 31.3200 -97.3300 251.000 30.0 163.122 2.580 -999.990 -999.990 1.631 ..P WKT 2011 02 06 01 14 55 31.3200 -97.3300 251.000 122.0 132.243 2.210 -999.990 -999.990 1.322 ..P WKT 2011 02 06 01 19 55 31.3200 -97.3300 251.000 457.0 132.588 2.730 -999.990 -999.990 1.326 ..P WKT 2011 02 06 01 29 55 31.3200 -97.3300 251.000 30.0 138.768 2.870 -999.990 -999.990 1.388 ..P WKT 2011 02 06 01 34 55 31.3200 -97.3300 251.000 122.0 139.401 3.090 -999.990 -999.990 1.394 ..P WKT 2011 02 06 01 39 55 31.3200 -97.3300 251.000 457.0 132.479 3.610 -999.990 -999.990 1.325 ..P WKT 2011 02 06 01 44 55 31.3200 -97.3300 251.000 30.0 146.038 3.450 -999.990 -999.990 1.460 ..P WKT 2011 02 06 01 49 55 31.3200 -97.3300 251.000 122.0 150.531 3.160 -999.990 -999.990 1.505 ..P WKT 2011 02 06 01 54 55 31.3200 -97.3300 251.000 457.0 136.894 2.840 -999.990 -999.990 1.369 ..P WKT 2011 02 06 02 04 55 31.3200 -97.3300 251.000 30.0 162.957 3.070 -999.990 -999.990 1.630 ..P WKT 2011 02 06 02 09 55 31.3200 -97.3300 251.000 122.0 149.607 3.470 -999.990 -999.990 1.496 ..P WKT 2011 02 06 02 14 55 31.3200 -97.3300 251.000 457.0 133.572 3.750 -999.990 -999.990 1.336 ..P WKT 2011 02 06 02 19 55 31.3200 -97.3300 251.000 30.0 164.879 3.230 -999.990 -999.990 1.649 ..P WKT 2011 02 06 02 24 55 31.3200 -97.3300 251.000 122.0 148.172 2.560 -999.990 -999.990 1.482 ..P WKT 2011 02 06 02 29 55 31.3200 -97.3300 251.000 457.0 138.348 2.890 -999.990 -999.990 1.383 ..P WKT 2011 02 06 02 39 55 31.3200 -97.3300 251.000 30.0 161.294 4.750 -999.990 -999.990 1.613 ..P WKT 2011 02 06 02 44 55 31.3200 -97.3300 251.000 122.0 161.159 2.950 -999.990 -999.990 1.612 ..P WKT 2011 02 06 02 49 55 31.3200 -97.3300 251.000 457.0 154.476 3.470 -999.990 -999.990 1.545 ..P WKT 2011 02 06 02 54 55 31.3200 -97.3300 251.000 30.0 163.408 2.910 -999.990 -999.990 1.634 ..P WKT 2011 02 06 02 59 55 31.3200 -97.3300 251.000 122.0 158.908 2.620 -999.990 -999.990 1.589 ..P WKT 2011 02 06 03 04 55 31.3200 -97.3300 251.000 457.0 140.976 3.260 -999.990 -999.990 1.410 ..P WKT 2011 02 06 03 14 55 31.3200 -97.3300 251.000 30.0 163.924 3.060 -999.990 -999.990 1.639 ..P WKT 2011 02 06 03 19 55 31.3200 -97.3300 251.000 122.0 154.267 3.060 -999.990 -999.990 1.543 ..P WKT 2011 02 06 03 24 55 31.3200 -97.3300 251.000 457.0 136.215 3.480 -999.990 -999.990 1.362 ..P WKT 2011 02 06 03 29 55 31.3200 -97.3300 251.000 30.0 162.152 3.830 -999.990 -999.990 1.622 ..P WKT 2011 02 06 03 34 55 31.3200 -97.3300 251.000 122.0 162.905 3.540 -999.990 -999.990 1.629 ..P WKT 2011 02 06 03 39 55 31.3200 -97.3300 251.000 457.0 130.748 2.410 -999.990 -999.990 1.307 ..P WKT 2011 02 06 03 49 55 31.3200 -97.3300 251.000 30.0 163.748 3.370 -999.990 -999.990 1.637 ..P WKT 2011 02 06 03 54 55 31.3200 -97.3300 251.000 122.0 181.555 3.570 -999.990 -999.990 1.816 ..P WKT 2011 02 06 03 59 55 31.3200 -97.3300 251.000 457.0 135.557 3.930 -999.990 -999.990 1.356 ..P WKT 2011 02 06 04 04 55 31.3200 -97.3300 251.000 30.0 167.470 3.160 -999.990 -999.990 1.675 ..P WKT 2011 02 06 04 09 55 31.3200 -97.3300 251.000 122.0 196.024 3.140 -999.990 -999.990 1.960 ..P WKT 2011 02 06 04 14 55 31.3200 -97.3300 251.000 457.0 131.553 2.540 -999.990 -999.990 1.316 ..P WKT 2011 02 06 04 24 55 31.3200 -97.3300 251.000 30.0 164.291 3.190 -999.990 -999.990 1.643 ..P WKT 2011 02 06 04 29 55 31.3200 -97.3300 251.000 122.0 168.810 3.100 -999.990 -999.990 1.688 ..P WKT 2011 02 06 04 34 55 31.3200 -97.3300 251.000 457.0 134.708 2.330 -999.990 -999.990 1.347 ..P WKT 2011 02 06 04 39 55 31.3200 -97.3300 251.000 30.0 172.810 2.930 -999.990 -999.990 1.728 ..P WKT 2011 02 06 04 44 55 31.3200 -97.3300 251.000 122.0 157.178 2.770 -999.990 -999.990 1.572 ..P WKT 2011 02 06 04 49 55 31.3200 -97.3300 251.000 457.0 126.098 2.850 -999.990 -999.990 1.261 ..P WKT 2011 02 06 05 04 55 31.3200 -97.3300 251.000 30.0 175.261 4.630 -999.990 -999.990 1.753 ..P WKT 2011 02 06 05 09 55 31.3200 -97.3300 251.000 122.0 161.311 3.810 -999.990 -999.990 1.613 ..P WKT 2011 02 06 05 14 55 31.3200 -97.3300 251.000 457.0 121.500 4.190 -999.990 -999.990 1.215 ..P WKT 2011 02 06 05 19 55 31.3200 -97.3300 251.000 30.0 189.164 2.760 -999.990 -999.990 1.892 ..P WKT 2011 02 06 05 24 55 31.3200 -97.3300 251.000 122.0 170.344 2.780 -999.990 -999.990 1.703 ..P WKT 2011 02 06 05 29 55 31.3200 -97.3300 251.000 457.0 129.021 2.400 -999.990 -999.990 1.290 ..P WKT 2011 02 06 05 39 55 31.3200 -97.3300 251.000 30.0 207.755 2.910 -999.990 -999.990 2.078 ..P WKT 2011 02 06 05 44 55 31.3200 -97.3300 251.000 122.0 172.306 2.890 -999.990 -999.990 1.723 ..P WKT 2011 02 06 05 49 55 31.3200 -97.3300 251.000 457.0 132.657 3.370 -999.990 -999.990 1.327 ..P WKT 2011 02 06 05 54 55 31.3200 -97.3300 251.000 30.0 212.581 3.690 -999.990 -999.990 2.126 ..P WKT 2011 02 06 05 59 55 31.3200 -97.3300 251.000 122.0 179.483 2.930 -999.990 -999.990 1.795 ..P WKT 2011 02 06 06 04 55 31.3200 -97.3300 251.000 457.0 136.810 4.930 -999.990 -999.990 1.368 ..P WKT 2011 02 06 06 14 55 31.3200 -97.3300 251.000 30.0 209.691 4.400 -999.990 -999.990 2.097 ..P WKT 2011 02 06 06 19 55 31.3200 -97.3300 251.000 122.0 141.515 3.530 -999.990 -999.990 1.415 ..P WKT 2011 02 06 06 24 55 31.3200 -97.3300 251.000 457.0 125.401 4.780 -999.990 -999.990 1.254 ..P WKT 2011 02 06 06 29 55 31.3200 -97.3300 251.000 30.0 196.452 5.080 -999.990 -999.990 1.965 ..P WKT 2011 02 06 06 34 55 31.3200 -97.3300 251.000 122.0 175.132 4.850 -999.990 -999.990 1.751 ..P WKT 2011 02 06 06 39 55 31.3200 -97.3300 251.000 457.0 129.291 4.250 -999.990 -999.990 1.293 ..P WKT 2011 02 06 06 49 55 31.3200 -97.3300 251.000 30.0 186.148 4.490 -999.990 -999.990 1.861 ..P WKT 2011 02 06 06 54 55 31.3200 -97.3300 251.000 122.0 236.952 4.100 -999.990 -999.990 2.370 ..P WKT 2011 02 06 06 59 55 31.3200 -97.3300 251.000 457.0 128.870 3.690 -999.990 -999.990 1.289 ..P WKT 2011 02 06 07 04 55 31.3200 -97.3300 251.000 30.0 180.682 4.040 -999.990 -999.990 1.807 ..P WKT 2011 02 06 07 09 55 31.3200 -97.3300 251.000 122.0 201.589 3.990 -999.990 -999.990 2.016 ..P WKT 2011 02 06 07 14 55 31.3200 -97.3300 251.000 457.0 132.808 3.820 -999.990 -999.990 1.328 ..P WKT 2011 02 06 07 24 55 31.3200 -97.3300 251.000 30.0 164.186 4.210 -999.990 -999.990 1.642 ..P WKT 2011 02 06 07 29 55 31.3200 -97.3300 251.000 122.0 190.109 4.210 -999.990 -999.990 1.901 ..P WKT 2011 02 06 07 34 55 31.3200 -97.3300 251.000 457.0 131.044 3.500 -999.990 -999.990 1.310 ..P WKT 2011 02 06 07 39 55 31.3200 -97.3300 251.000 30.0 160.998 4.480 -999.990 -999.990 1.610 ..P WKT 2011 02 06 07 44 55 31.3200 -97.3300 251.000 122.0 201.031 3.670 -999.990 -999.990 2.010 ..P WKT 2011 02 06 07 49 55 31.3200 -97.3300 251.000 457.0 122.479 2.700 -999.990 -999.990 1.225 ..P WKT 2011 02 06 07 59 55 31.3200 -97.3300 251.000 30.0 166.362 2.430 -999.990 -999.990 1.664 ..P WKT 2011 02 06 08 04 55 31.3200 -97.3300 251.000 122.0 185.663 3.980 -999.990 -999.990 1.857 ..P WKT 2011 02 06 08 09 55 31.3200 -97.3300 251.000 457.0 146.511 3.680 -999.990 -999.990 1.465 ..P WKT 2011 02 06 08 14 55 31.3200 -97.3300 251.000 30.0 155.735 3.510 -999.990 -999.990 1.557 ..P WKT 2011 02 06 08 19 55 31.3200 -97.3300 251.000 122.0 166.638 2.510 -999.990 -999.990 1.666 ..P WKT 2011 02 06 08 24 55 31.3200 -97.3300 251.000 457.0 137.563 4.530 -999.990 -999.990 1.376 ..P WKT 2011 02 06 08 34 55 31.3200 -97.3300 251.000 30.0 161.049 2.930 -999.990 -999.990 1.610 ..P WKT 2011 02 06 08 39 55 31.3200 -97.3300 251.000 122.0 180.016 3.040 -999.990 -999.990 1.800 ..P WKT 2011 02 06 08 44 55 31.3200 -97.3300 251.000 457.0 150.268 3.190 -999.990 -999.990 1.503 ..P WKT 2011 02 06 08 49 55 31.3200 -97.3300 251.000 30.0 165.876 2.630 -999.990 -999.990 1.659 ..P WKT 2011 02 06 08 54 55 31.3200 -97.3300 251.000 122.0 167.373 3.440 -999.990 -999.990 1.674 ..P WKT 2011 02 06 08 59 55 31.3200 -97.3300 251.000 457.0 169.206 3.130 -999.990 -999.990 1.692 ..P WKT 2011 02 06 09 09 55 31.3200 -97.3300 251.000 30.0 162.840 3.820 -999.990 -999.990 1.628 ..P WKT 2011 02 06 09 14 55 31.3200 -97.3300 251.000 122.0 162.034 3.320 -999.990 -999.990 1.620 ..P WKT 2011 02 06 09 19 55 31.3200 -97.3300 251.000 457.0 175.674 4.060 -999.990 -999.990 1.757 ..P WKT 2011 02 06 09 24 55 31.3200 -97.3300 251.000 30.0 164.620 3.600 -999.990 -999.990 1.646 ..P WKT 2011 02 06 09 29 55 31.3200 -97.3300 251.000 122.0 169.356 2.980 -999.990 -999.990 1.694 ..P WKT 2011 02 06 09 34 55 31.3200 -97.3300 251.000 457.0 166.366 3.180 -999.990 -999.990 1.664 ..P WKT 2011 02 06 09 44 55 31.3200 -97.3300 251.000 30.0 170.008 3.400 -999.990 -999.990 1.700 ..P WKT 2011 02 06 09 49 55 31.3200 -97.3300 251.000 122.0 172.778 2.590 -999.990 -999.990 1.728 ..P WKT 2011 02 06 09 54 55 31.3200 -97.3300 251.000 457.0 148.667 3.050 -999.990 -999.990 1.487 ..P WKT 2011 02 06 09 59 55 31.3200 -97.3300 251.000 30.0 170.084 3.530 -999.990 -999.990 1.701 ..P WKT 2011 02 06 10 04 55 31.3200 -97.3300 251.000 122.0 175.037 3.490 -999.990 -999.990 1.750 ..P WKT 2011 02 06 10 09 55 31.3200 -97.3300 251.000 457.0 170.750 3.820 -999.990 -999.990 1.708 ..P WKT 2011 02 06 10 19 55 31.3200 -97.3300 251.000 30.0 172.137 2.550 -999.990 -999.990 1.721 ..P WKT 2011 02 06 10 24 55 31.3200 -97.3300 251.000 122.0 175.122 4.240 -999.990 -999.990 1.751 ..P WKT 2011 02 06 10 29 55 31.3200 -97.3300 251.000 457.0 146.690 3.380 -999.990 -999.990 1.467 ..P WKT 2011 02 06 10 34 55 31.3200 -97.3300 251.000 30.0 170.340 3.340 -999.990 -999.990 1.703 ..P WKT 2011 02 06 10 39 55 31.3200 -97.3300 251.000 122.0 170.637 3.220 -999.990 -999.990 1.706 ..P WKT 2011 02 06 10 44 55 31.3200 -97.3300 251.000 457.0 140.693 2.170 -999.990 -999.990 1.407 ..P WKT 2011 02 06 10 54 55 31.3200 -97.3300 251.000 30.0 173.856 2.520 -999.990 -999.990 1.739 ..P WKT 2011 02 06 10 59 55 31.3200 -97.3300 251.000 122.0 176.986 3.280 -999.990 -999.990 1.770 ..P WKT 2011 02 06 11 04 55 31.3200 -97.3300 251.000 457.0 146.009 3.110 -999.990 -999.990 1.460 ..P WKT 2011 02 06 11 09 55 31.3200 -97.3300 251.000 30.0 181.397 3.170 -999.990 -999.990 1.814 ..P WKT 2011 02 06 11 14 55 31.3200 -97.3300 251.000 122.0 177.806 3.900 -999.990 -999.990 1.778 ..P WKT 2011 02 06 11 19 55 31.3200 -97.3300 251.000 457.0 165.813 2.980 -999.990 -999.990 1.658 ..P WKT 2011 02 06 11 29 55 31.3200 -97.3300 251.000 30.0 179.832 3.320 -999.990 -999.990 1.798 ..P WKT 2011 02 06 11 34 55 31.3200 -97.3300 251.000 122.0 168.541 3.960 -999.990 -999.990 1.685 ..P WKT 2011 02 06 11 39 55 31.3200 -97.3300 251.000 457.0 181.110 4.480 -999.990 -999.990 1.811 ..P WKT 2011 02 06 11 44 55 31.3200 -97.3300 251.000 30.0 180.909 3.750 -999.990 -999.990 1.809 ..P WKT 2011 02 06 11 49 55 31.3200 -97.3300 251.000 122.0 170.627 3.690 -999.990 -999.990 1.706 ..P WKT 2011 02 06 12 09 55 31.3200 -97.3300 251.000 457.0 152.357 3.940 -999.990 -999.990 1.524 ..P WKT 2011 02 06 12 10 25 31.3200 -97.3300 251.000 457.0 161.148 3.600 -999.990 -999.990 1.611 ..P WKT 2011 02 06 12 10 55 31.3200 -97.3300 251.000 457.0 161.204 4.580 -999.990 -999.990 1.612 ..P WKT 2011 02 06 12 11 25 31.3200 -97.3300 251.000 457.0 158.908 5.420 -999.990 -999.990 1.589 ..P WKT 2011 02 06 12 11 55 31.3200 -97.3300 251.000 457.0 156.612 4.390 -999.990 -999.990 1.566 ..P WKT 2011 02 06 12 12 25 31.3200 -97.3300 251.000 457.0 153.979 4.490 -999.990 -999.990 1.540 ..P WKT 2011 02 06 12 12 55 31.3200 -97.3300 251.000 457.0 153.027 4.550 -999.990 -999.990 1.530 ..P WKT 2011 02 06 12 13 25 31.3200 -97.3300 251.000 457.0 158.458 3.680 -999.990 -999.990 1.585 ..P WKT 2011 02 06 12 13 55 31.3200 -97.3300 251.000 457.0 155.490 3.550 -999.990 -999.990 1.555 ..P WKT 2011 02 06 12 14 25 31.3200 -97.3300 251.000 457.0 159.242 3.520 -999.990 -999.990 1.592 ..P WKT 2011 02 06 12 14 55 31.3200 -97.3300 251.000 457.0 159.297 3.500 -999.990 -999.990 1.593 ..P WKT 2011 02 06 12 19 55 31.3200 -97.3300 251.000 30.0 179.003 3.630 -999.990 -999.990 1.790 ..P WKT 2011 02 06 12 24 55 31.3200 -97.3300 251.000 122.0 167.800 3.550 -999.990 -999.990 1.678 ..P WKT 2011 02 06 12 29 55 31.3200 -97.3300 251.000 457.0 163.318 5.390 -999.990 -999.990 1.633 ..P WKT 2011 02 06 12 34 55 31.3200 -97.3300 251.000 30.0 176.301 3.110 -999.990 -999.990 1.763 ..P WKT 2011 02 06 12 39 55 31.3200 -97.3300 251.000 122.0 171.482 4.260 -999.990 -999.990 1.715 ..P WKT 2011 02 06 12 44 55 31.3200 -97.3300 251.000 457.0 163.979 2.780 -999.990 -999.990 1.640 ..P WKT 2011 02 06 12 54 55 31.3200 -97.3300 251.000 30.0 178.019 3.020 -999.990 -999.990 1.780 ..P WKT 2011 02 06 12 59 55 31.3200 -97.3300 251.000 122.0 174.044 3.220 -999.990 -999.990 1.740 ..P WKT 2011 02 06 13 04 55 31.3200 -97.3300 251.000 457.0 170.406 3.040 -999.990 -999.990 1.704 ..P WKT 2011 02 06 13 09 55 31.3200 -97.3300 251.000 30.0 182.542 2.910 -999.990 -999.990 1.825 ..P WKT 2011 02 06 13 14 55 31.3200 -97.3300 251.000 122.0 172.528 3.080 -999.990 -999.990 1.725 ..P WKT 2011 02 06 13 19 55 31.3200 -97.3300 251.000 457.0 151.777 4.280 -999.990 -999.990 1.518 ..P WKT 2011 02 06 13 29 55 31.3200 -97.3300 251.000 30.0 167.825 4.010 -999.990 -999.990 1.678 ..P WKT 2011 02 06 13 34 55 31.3200 -97.3300 251.000 122.0 168.384 3.260 -999.990 -999.990 1.684 ..P WKT 2011 02 06 13 39 55 31.3200 -97.3300 251.000 457.0 155.021 3.170 -999.990 -999.990 1.550 ..P WKT 2011 02 06 13 44 55 31.3200 -97.3300 251.000 30.0 170.841 3.410 -999.990 -999.990 1.708 ..P WKT 2011 02 06 13 49 55 31.3200 -97.3300 251.000 122.0 175.087 2.910 -999.990 -999.990 1.751 ..P WKT 2011 02 06 13 54 55 31.3200 -97.3300 251.000 457.0 161.225 2.730 -999.990 -999.990 1.612 ..P WKT 2011 02 06 14 04 55 31.3200 -97.3300 251.000 30.0 178.362 4.200 -999.990 -999.990 1.784 ..P WKT 2011 02 06 14 09 55 31.3200 -97.3300 251.000 122.0 166.443 3.580 -999.990 -999.990 1.664 ..P WKT 2011 02 06 14 14 55 31.3200 -97.3300 251.000 457.0 165.587 3.250 -999.990 -999.990 1.656 ..P WKT 2011 02 06 14 19 55 31.3200 -97.3300 251.000 30.0 169.927 3.830 -999.990 -999.990 1.699 ..P WKT 2011 02 06 14 24 55 31.3200 -97.3300 251.000 122.0 165.888 3.300 -999.990 -999.990 1.659 ..P WKT 2011 02 06 14 29 55 31.3200 -97.3300 251.000 457.0 164.698 3.890 -999.990 -999.990 1.647 ..P WKT 2011 02 06 14 39 55 31.3200 -97.3300 251.000 30.0 172.634 3.450 -999.990 -999.990 1.726 ..P WKT 2011 02 06 14 44 55 31.3200 -97.3300 251.000 122.0 166.346 3.260 -999.990 -999.990 1.663 ..P WKT 2011 02 06 14 49 55 31.3200 -97.3300 251.000 457.0 167.094 3.050 -999.990 -999.990 1.671 ..P WKT 2011 02 06 14 54 55 31.3200 -97.3300 251.000 30.0 166.168 4.420 -999.990 -999.990 1.662 ..P WKT 2011 02 06 14 59 55 31.3200 -97.3300 251.000 122.0 165.577 4.180 -999.990 -999.990 1.656 ..P WKT 2011 02 06 15 04 55 31.3200 -97.3300 251.000 457.0 162.139 2.880 -999.990 -999.990 1.621 ..P WKT 2011 02 06 15 14 55 31.3200 -97.3300 251.000 30.0 169.280 3.710 -999.990 -999.990 1.693 ..P WKT 2011 02 06 15 19 55 31.3200 -97.3300 251.000 122.0 160.941 2.460 -999.990 -999.990 1.609 ..P WKT 2011 02 06 15 24 55 31.3200 -97.3300 251.000 457.0 157.960 2.980 -999.990 -999.990 1.580 ..P WKT 2011 02 06 15 29 55 31.3200 -97.3300 251.000 30.0 165.355 2.040 -999.990 -999.990 1.654 ..P WKT 2011 02 06 15 34 55 31.3200 -97.3300 251.000 122.0 161.035 2.840 -999.990 -999.990 1.610 ..P WKT 2011 02 06 15 39 55 31.3200 -97.3300 251.000 457.0 156.716 2.780 -999.990 -999.990 1.567 ..P WKT 2011 02 06 15 49 55 31.3200 -97.3300 251.000 30.0 165.980 1.930 -999.990 -999.990 1.660 ..P WKT 2011 02 06 15 54 55 31.3200 -97.3300 251.000 122.0 173.538 1.970 -999.990 -999.990 1.735 ..P WKT 2011 02 06 15 59 55 31.3200 -97.3300 251.000 457.0 144.633 1.690 -999.990 -999.990 1.446 ..P WKT 2011 02 06 16 04 55 31.3200 -97.3300 251.000 30.0 169.918 1.880 -999.990 -999.990 1.699 ..P WKT 2011 02 06 16 09 55 31.3200 -97.3300 251.000 122.0 169.112 2.730 -999.990 -999.990 1.691 ..P WKT 2011 02 06 16 14 55 31.3200 -97.3300 251.000 457.0 145.901 2.300 -999.990 -999.990 1.459 ..P WKT 2011 02 06 16 24 55 31.3200 -97.3300 251.000 30.0 171.424 2.720 -999.990 -999.990 1.714 ..P WKT 2011 02 06 16 29 55 31.3200 -97.3300 251.000 122.0 171.335 2.800 -999.990 -999.990 1.713 ..P WKT 2011 02 06 16 34 55 31.3200 -97.3300 251.000 457.0 146.175 1.840 -999.990 -999.990 1.462 ..P WKT 2011 02 06 16 39 55 31.3200 -97.3300 251.000 30.0 164.472 3.090 -999.990 -999.990 1.645 ..P WKT 2011 02 06 16 44 55 31.3200 -97.3300 251.000 122.0 162.712 2.150 -999.990 -999.990 1.627 ..P WKT 2011 02 06 16 49 55 31.3200 -97.3300 251.000 457.0 163.960 3.350 -999.990 -999.990 1.640 ..P WKT 2011 02 06 17 04 55 31.3200 -97.3300 251.000 30.0 164.166 2.430 -999.990 -999.990 1.642 ..P WKT 2011 02 06 17 09 55 31.3200 -97.3300 251.000 122.0 165.650 1.920 -999.990 -999.990 1.657 ..P WKT 2011 02 06 17 14 55 31.3200 -97.3300 251.000 457.0 161.455 3.390 -999.990 -999.990 1.615 ..P WKT 2011 02 06 17 19 55 31.3200 -97.3300 251.000 30.0 165.276 2.670 -999.990 -999.990 1.653 ..P WKT 2011 02 06 17 24 55 31.3200 -97.3300 251.000 122.0 159.579 2.620 -999.990 -999.990 1.596 ..P WKT 2011 02 06 17 29 55 31.3200 -97.3300 251.000 457.0 154.885 3.930 -999.990 -999.990 1.549 ..P WKT 2011 02 06 17 39 55 31.3200 -97.3300 251.000 30.0 153.037 2.640 -999.990 -999.990 1.530 ..P WKT 2011 02 06 17 44 55 31.3200 -97.3300 251.000 122.0 156.884 2.510 -999.990 -999.990 1.569 ..P WKT 2011 02 06 17 49 55 31.3200 -97.3300 251.000 457.0 152.886 3.510 -999.990 -999.990 1.529 ..P WKT 2011 02 06 17 54 55 31.3200 -97.3300 251.000 30.0 157.400 4.150 -999.990 -999.990 1.574 ..P WKT 2011 02 06 17 59 55 31.3200 -97.3300 251.000 122.0 158.408 3.050 -999.990 -999.990 1.584 ..P WKT 2011 02 06 18 04 55 31.3200 -97.3300 251.000 457.0 156.414 3.250 -999.990 -999.990 1.564 ..P WKT 2011 02 06 18 14 55 31.3200 -97.3300 251.000 30.0 153.904 4.210 -999.990 -999.990 1.539 ..P WKT 2011 02 06 18 19 55 31.3200 -97.3300 251.000 122.0 159.225 3.290 -999.990 -999.990 1.592 ..P WKT 2011 02 06 18 24 55 31.3200 -97.3300 251.000 457.0 154.539 2.840 -999.990 -999.990 1.545 ..P WKT 2011 02 06 18 29 55 31.3200 -97.3300 251.000 30.0 157.191 3.040 -999.990 -999.990 1.572 ..P WKT 2011 02 06 18 34 55 31.3200 -97.3300 251.000 122.0 154.841 2.400 -999.990 -999.990 1.548 ..P WKT 2011 02 06 18 39 55 31.3200 -97.3300 251.000 457.0 146.155 2.550 -999.990 -999.990 1.462 ..P WKT 2011 02 06 18 49 55 31.3200 -97.3300 251.000 30.0 152.221 2.260 -999.990 -999.990 1.522 ..P WKT 2011 02 06 18 54 55 31.3200 -97.3300 251.000 122.0 147.133 3.100 -999.990 -999.990 1.471 ..P WKT 2011 02 06 18 59 55 31.3200 -97.3300 251.000 457.0 151.380 4.280 -999.990 -999.990 1.514 ..P WKT 2011 02 06 19 04 55 31.3200 -97.3300 251.000 30.0 149.293 4.110 -999.990 -999.990 1.493 ..P WKT 2011 02 06 19 09 55 31.3200 -97.3300 251.000 122.0 147.373 3.130 -999.990 -999.990 1.474 ..P WKT 2011 02 06 19 14 55 31.3200 -97.3300 251.000 457.0 137.958 4.130 -999.990 -999.990 1.380 ..P WKT 2011 02 06 19 24 55 31.3200 -97.3300 251.000 30.0 141.664 3.510 -999.990 -999.990 1.417 ..P WKT 2011 02 06 19 29 55 31.3200 -97.3300 251.000 122.0 145.291 3.770 -999.990 -999.990 1.453 ..P WKT 2011 02 06 19 34 55 31.3200 -97.3300 251.000 457.0 137.591 3.540 -999.990 -999.990 1.376 ..P WKT 2011 02 06 19 39 55 31.3200 -97.3300 251.000 30.0 136.554 3.700 -999.990 -999.990 1.366 ..P WKT 2011 02 06 19 44 55 31.3200 -97.3300 251.000 122.0 137.848 4.350 -999.990 -999.990 1.378 ..P WKT 2011 02 06 19 49 55 31.3200 -97.3300 251.000 457.0 139.141 3.670 -999.990 -999.990 1.391 ..P WKT 2011 02 06 19 59 55 31.3200 -97.3300 251.000 30.0 137.829 3.980 -999.990 -999.990 1.378 ..P WKT 2011 02 06 20 04 55 31.3200 -97.3300 251.000 122.0 133.559 3.330 -999.990 -999.990 1.336 ..P WKT 2011 02 06 20 09 55 31.3200 -97.3300 251.000 457.0 136.945 3.630 -999.990 -999.990 1.369 ..P WKT 2011 02 06 20 14 55 31.3200 -97.3300 251.000 30.0 137.335 3.790 -999.990 -999.990 1.373 ..P WKT 2011 02 06 20 19 55 31.3200 -97.3300 251.000 122.0 129.406 2.860 -999.990 -999.990 1.294 ..P WKT 2011 02 06 20 24 55 31.3200 -97.3300 251.000 457.0 133.124 4.570 -999.990 -999.990 1.331 ..P WKT 2011 02 06 20 34 55 31.3200 -97.3300 251.000 30.0 134.023 2.350 -999.990 -999.990 1.340 ..P WKT 2011 02 06 20 39 55 31.3200 -97.3300 251.000 122.0 136.860 3.490 -999.990 -999.990 1.369 ..P WKT 2011 02 06 20 44 55 31.3200 -97.3300 251.000 457.0 138.034 4.250 -999.990 -999.990 1.380 ..P WKT 2011 02 06 20 49 55 31.3200 -97.3300 251.000 30.0 135.217 3.930 -999.990 -999.990 1.352 ..P WKT 2011 02 06 20 54 55 31.3200 -97.3300 251.000 122.0 139.050 3.350 -999.990 -999.990 1.391 ..P WKT 2011 02 06 20 59 55 31.3200 -97.3300 251.000 457.0 131.911 5.480 -999.990 -999.990 1.319 ..P WKT 2011 02 06 21 09 55 31.3200 -97.3300 251.000 30.0 135.659 4.010 -999.990 -999.990 1.357 ..P WKT 2011 02 06 21 14 55 31.3200 -97.3300 251.000 122.0 139.231 4.260 -999.990 -999.990 1.392 ..P WKT 2011 02 06 21 19 55 31.3200 -97.3300 251.000 457.0 134.991 3.820 -999.990 -999.990 1.350 ..P WKT 2011 02 06 21 24 55 31.3200 -97.3300 251.000 30.0 138.395 3.410 -999.990 -999.990 1.384 ..P WKT 2011 02 06 21 29 55 31.3200 -97.3300 251.000 122.0 134.655 3.100 -999.990 -999.990 1.347 ..P WKT 2011 02 06 21 34 55 31.3200 -97.3300 251.000 457.0 135.234 3.020 -999.990 -999.990 1.352 ..P WKT 2011 02 06 21 44 55 31.3200 -97.3300 251.000 30.0 139.881 3.240 -999.990 -999.990 1.399 ..P WKT 2011 02 06 21 49 55 31.3200 -97.3300 251.000 122.0 134.813 3.880 -999.990 -999.990 1.348 ..P WKT 2011 02 06 21 54 55 31.3200 -97.3300 251.000 457.0 141.868 3.300 -999.990 -999.990 1.419 ..P WKT 2011 02 06 21 59 55 31.3200 -97.3300 251.000 30.0 147.926 3.220 -999.990 -999.990 1.479 ..P WKT 2011 02 06 22 04 55 31.3200 -97.3300 251.000 122.0 147.010 3.550 -999.990 -999.990 1.470 ..P WKT 2011 02 06 22 09 55 31.3200 -97.3300 251.000 457.0 145.927 3.620 -999.990 -999.990 1.459 ..P WKT 2011 02 06 22 19 55 31.3200 -97.3300 251.000 30.0 145.518 3.550 -999.990 -999.990 1.455 ..P WKT 2011 02 06 22 24 55 31.3200 -97.3300 251.000 122.0 158.139 3.770 -999.990 -999.990 1.581 ..P WKT 2011 02 06 22 29 55 31.3200 -97.3300 251.000 457.0 159.309 3.270 -999.990 -999.990 1.593 ..P WKT 2011 02 06 22 34 55 31.3200 -97.3300 251.000 30.0 165.953 3.260 -999.990 -999.990 1.660 ..P WKT 2011 02 06 22 39 55 31.3200 -97.3300 251.000 122.0 173.591 3.310 -999.990 -999.990 1.736 ..P WKT 2011 02 06 22 44 55 31.3200 -97.3300 251.000 457.0 159.497 2.900 -999.990 -999.990 1.595 ..P WKT 2011 02 06 22 54 55 31.3200 -97.3300 251.000 30.0 167.401 3.310 -999.990 -999.990 1.674 ..P WKT 2011 02 06 22 59 55 31.3200 -97.3300 251.000 122.0 166.010 2.930 -999.990 -999.990 1.660 ..P WKT 2011 02 06 23 04 55 31.3200 -97.3300 251.000 457.0 160.639 3.470 -999.990 -999.990 1.606 ..P WKT 2011 02 06 23 09 55 31.3200 -97.3300 251.000 30.0 161.902 2.930 -999.990 -999.990 1.619 ..P WKT 2011 02 06 23 14 55 31.3200 -97.3300 251.000 122.0 159.517 3.710 -999.990 -999.990 1.595 ..P WKT 2011 02 06 23 19 55 31.3200 -97.3300 251.000 457.0 162.769 2.860 -999.990 -999.990 1.628 ..P WKT 2011 02 06 23 29 55 31.3200 -97.3300 251.000 30.0 162.996 3.230 -999.990 -999.990 1.630 ..P WKT 2011 02 06 23 34 55 31.3200 -97.3300 251.000 122.0 157.984 3.110 -999.990 -999.990 1.580 ..P WKT 2011 02 06 23 39 55 31.3200 -97.3300 251.000 457.0 160.595 3.920 -999.990 -999.990 1.606 ..P WKT 2011 02 06 23 44 55 31.3200 -97.3300 251.000 30.0 163.869 5.040 -999.990 -999.990 1.639 ..P WKT 2011 02 06 23 49 55 31.3200 -97.3300 251.000 122.0 160.183 3.750 -999.990 -999.990 1.602 ..P WKT 2011 02 07 00 09 55 31.3200 -97.3300 251.000 457.0 154.356 3.550 -999.990 -999.990 1.544 ..P WKT 2011 02 07 00 10 25 31.3200 -97.3300 251.000 457.0 149.634 3.810 -999.990 -999.990 1.496 ..P WKT 2011 02 07 00 10 55 31.3200 -97.3300 251.000 457.0 155.184 3.520 -999.990 -999.990 1.552 ..P WKT 2011 02 07 00 11 25 31.3200 -97.3300 251.000 457.0 145.493 3.400 -999.990 -999.990 1.455 ..P WKT 2011 02 07 00 11 55 31.3200 -97.3300 251.000 457.0 148.724 3.860 -999.990 -999.990 1.487 ..P WKT 2011 02 07 00 12 25 31.3200 -97.3300 251.000 457.0 147.647 3.480 -999.990 -999.990 1.476 ..P WKT 2011 02 07 00 12 55 31.3200 -97.3300 251.000 457.0 150.214 3.470 -999.990 -999.990 1.502 ..P WKT 2011 02 07 00 13 25 31.3200 -97.3300 251.000 457.0 150.794 3.710 -999.990 -999.990 1.508 ..P WKT 2011 02 07 00 13 55 31.3200 -97.3300 251.000 457.0 154.687 3.620 -999.990 -999.990 1.547 ..P WKT 2011 02 07 00 14 25 31.3200 -97.3300 251.000 457.0 151.953 3.530 -999.990 -999.990 1.520 ..P WKT 2011 02 07 00 14 55 31.3200 -97.3300 251.000 457.0 147.895 3.860 -999.990 -999.990 1.479 ..P WKT 2011 02 07 00 19 55 31.3200 -97.3300 251.000 30.0 147.066 3.420 -999.990 -999.990 1.471 ..P WKT 2011 02 07 00 24 55 31.3200 -97.3300 251.000 122.0 144.249 4.170 -999.990 -999.990 1.442 ..P WKT 2011 02 07 00 29 55 31.3200 -97.3300 251.000 457.0 145.409 5.040 -999.990 -999.990 1.454 ..P WKT 2011 02 07 00 34 55 31.3200 -97.3300 251.000 30.0 147.231 4.330 -999.990 -999.990 1.472 ..P WKT 2011 02 07 00 39 55 31.3200 -97.3300 251.000 122.0 156.015 3.800 -999.990 -999.990 1.560 ..P WKT 2011 02 07 00 44 55 31.3200 -97.3300 251.000 457.0 147.894 2.930 -999.990 -999.990 1.479 ..P WKT 2011 02 07 00 54 55 31.3200 -97.3300 251.000 30.0 157.668 3.220 -999.990 -999.990 1.577 ..P WKT 2011 02 07 00 59 55 31.3200 -97.3300 251.000 122.0 157.994 3.950 -999.990 -999.990 1.580 ..P WKT 2011 02 07 01 04 55 31.3200 -97.3300 251.000 457.0 158.819 4.690 -999.990 -999.990 1.588 ..P WKT 2011 02 07 01 09 55 31.3200 -97.3300 251.000 30.0 158.317 4.180 -999.990 -999.990 1.583 ..P WKT 2011 02 07 01 14 55 31.3200 -97.3300 251.000 122.0 158.974 3.330 -999.990 -999.990 1.590 ..P WKT 2011 02 07 01 19 55 31.3200 -97.3300 251.000 457.0 154.327 3.910 -999.990 -999.990 1.543 ..P WKT 2011 02 07 01 29 55 31.3200 -97.3300 251.000 30.0 156.781 5.150 -999.990 -999.990 1.568 ..P WKT 2011 02 07 01 34 55 31.3200 -97.3300 251.000 122.0 159.572 3.420 -999.990 -999.990 1.596 ..P WKT 2011 02 07 01 39 55 31.3200 -97.3300 251.000 457.0 145.444 3.630 -999.990 -999.990 1.454 ..P WKT 2011 02 07 01 44 55 31.3200 -97.3300 251.000 30.0 157.359 3.800 -999.990 -999.990 1.574 ..P WKT 2011 02 07 01 49 55 31.3200 -97.3300 251.000 122.0 168.943 3.840 -999.990 -999.990 1.689 ..P WKT 2011 02 07 01 54 55 31.3200 -97.3300 251.000 457.0 155.975 5.490 -999.990 -999.990 1.560 ..P WKT 2011 02 07 02 04 55 31.3200 -97.3300 251.000 30.0 166.679 3.640 -999.990 -999.990 1.667 ..P WKT 2011 02 07 02 09 55 31.3200 -97.3300 251.000 122.0 161.484 4.400 -999.990 -999.990 1.615 ..P WKT 2011 02 07 02 14 55 31.3200 -97.3300 251.000 457.0 163.423 3.110 -999.990 -999.990 1.634 ..P WKT 2011 02 07 02 19 55 31.3200 -97.3300 251.000 30.0 160.051 2.940 -999.990 -999.990 1.601 ..P WKT 2011 02 07 02 24 55 31.3200 -97.3300 251.000 122.0 168.133 3.980 -999.990 -999.990 1.681 ..P WKT 2011 02 07 02 29 55 31.3200 -97.3300 251.000 457.0 155.465 3.940 -999.990 -999.990 1.555 ..P WKT 2011 02 07 02 39 55 31.3200 -97.3300 251.000 30.0 158.539 3.120 -999.990 -999.990 1.585 ..P WKT 2011 02 07 02 44 55 31.3200 -97.3300 251.000 122.0 163.657 5.230 -999.990 -999.990 1.637 ..P WKT 2011 02 07 02 49 55 31.3200 -97.3300 251.000 457.0 159.146 3.480 -999.990 -999.990 1.591 ..P WKT 2011 02 07 02 54 55 31.3200 -97.3300 251.000 30.0 164.265 3.400 -999.990 -999.990 1.643 ..P WKT 2011 02 07 02 59 55 31.3200 -97.3300 251.000 122.0 163.241 3.990 -999.990 -999.990 1.632 ..P WKT 2011 02 07 03 04 55 31.3200 -97.3300 251.000 457.0 161.884 2.860 -999.990 -999.990 1.619 ..P WKT 2011 02 07 03 14 55 31.3200 -97.3300 251.000 30.0 160.925 2.770 -999.990 -999.990 1.609 ..P WKT 2011 02 07 03 19 55 31.3200 -97.3300 251.000 122.0 165.311 3.250 -999.990 -999.990 1.653 ..P WKT 2011 02 07 03 24 55 31.3200 -97.3300 251.000 457.0 154.414 3.570 -999.990 -999.990 1.544 ..P WKT 2011 02 07 03 29 55 31.3200 -97.3300 251.000 30.0 154.812 5.480 -999.990 -999.990 1.548 ..P WKT 2011 02 07 03 34 55 31.3200 -97.3300 251.000 122.0 158.866 3.050 -999.990 -999.990 1.589 ..P WKT 2011 02 07 03 39 55 31.3200 -97.3300 251.000 457.0 162.256 4.110 -999.990 -999.990 1.623 ..P WKT 2011 02 07 03 49 55 31.3200 -97.3300 251.000 30.0 158.543 2.780 -999.990 -999.990 1.585 ..P WKT 2011 02 07 03 54 55 31.3200 -97.3300 251.000 122.0 160.746 3.150 -999.990 -999.990 1.607 ..P WKT 2011 02 07 03 59 55 31.3200 -97.3300 251.000 457.0 158.296 3.830 -999.990 -999.990 1.583 ..P WKT 2011 02 07 04 04 55 31.3200 -97.3300 251.000 30.0 150.526 5.280 -999.990 -999.990 1.505 ..P WKT 2011 02 07 04 09 55 31.3200 -97.3300 251.000 122.0 156.719 4.590 -999.990 -999.990 1.567 ..P WKT 2011 02 07 04 14 55 31.3200 -97.3300 251.000 457.0 152.273 3.150 -999.990 -999.990 1.523 ..P WKT 2011 02 07 04 24 55 31.3200 -97.3300 251.000 30.0 146.752 3.900 -999.990 -999.990 1.468 ..P WKT 2011 02 07 04 29 55 31.3200 -97.3300 251.000 122.0 152.329 4.340 -999.990 -999.990 1.523 ..P WKT 2011 02 07 04 34 55 31.3200 -97.3300 251.000 457.0 142.607 4.760 -999.990 -999.990 1.426 ..P WKT 2011 02 07 04 39 55 31.3200 -97.3300 251.000 30.0 148.850 6.170 -999.990 -999.990 1.488 ..P WKT 2011 02 07 04 44 55 31.3200 -97.3300 251.000 122.0 149.106 5.110 -999.990 -999.990 1.491 ..P WKT 2011 02 07 04 49 55 31.3200 -97.3300 251.000 457.0 145.037 4.400 -999.990 -999.990 1.450 ..P WKT 2011 02 07 05 04 55 31.3200 -97.3300 251.000 30.0 147.907 5.490 -999.990 -999.990 1.479 ..P WKT 2011 02 07 05 09 55 31.3200 -97.3300 251.000 122.0 144.806 6.090 -999.990 -999.990 1.448 ..P WKT 2011 02 07 05 14 55 31.3200 -97.3300 251.000 457.0 137.045 6.640 -999.990 -999.990 1.370 ..P WKT 2011 02 07 05 19 55 31.3200 -97.3300 251.000 30.0 140.598 4.500 -999.990 -999.990 1.406 ..P WKT 2011 02 07 05 24 55 31.3200 -97.3300 251.000 122.0 138.826 3.800 -999.990 -999.990 1.388 ..P WKT 2011 02 07 05 29 55 31.3200 -97.3300 251.000 457.0 141.216 3.060 -999.990 -999.990 1.412 ..P WKT 2011 02 07 05 39 55 31.3200 -97.3300 251.000 30.0 142.838 3.680 -999.990 -999.990 1.428 ..P WKT 2011 02 07 05 44 55 31.3200 -97.3300 251.000 122.0 136.078 4.060 -999.990 -999.990 1.361 ..P WKT 2011 02 07 05 49 55 31.3200 -97.3300 251.000 457.0 138.808 4.730 -999.990 -999.990 1.388 ..P WKT 2011 02 07 05 54 55 31.3200 -97.3300 251.000 30.0 139.871 3.970 -999.990 -999.990 1.399 ..P WKT 2011 02 07 05 59 55 31.3200 -97.3300 251.000 122.0 137.439 3.110 -999.990 -999.990 1.374 ..P WKT 2011 02 07 06 04 55 31.3200 -97.3300 251.000 457.0 138.004 3.940 -999.990 -999.990 1.380 ..P WKT 2011 02 07 06 14 55 31.3200 -97.3300 251.000 30.0 141.727 3.610 -999.990 -999.990 1.417 ..P WKT 2011 02 07 06 19 55 31.3200 -97.3300 251.000 122.0 141.720 3.030 -999.990 -999.990 1.417 ..P WKT 2011 02 07 06 24 55 31.3200 -97.3300 251.000 457.0 135.718 3.520 -999.990 -999.990 1.357 ..P WKT 2011 02 07 06 29 55 31.3200 -97.3300 251.000 30.0 142.209 3.810 -999.990 -999.990 1.422 ..P WKT 2011 02 07 06 34 55 31.3200 -97.3300 251.000 122.0 145.201 3.910 -999.990 -999.990 1.452 ..P WKT 2011 02 07 06 39 55 31.3200 -97.3300 251.000 457.0 143.363 3.990 -999.990 -999.990 1.434 ..P WKT 2011 02 07 06 49 55 31.3200 -97.3300 251.000 30.0 140.518 4.430 -999.990 -999.990 1.405 ..P WKT 2011 02 07 06 54 55 31.3200 -97.3300 251.000 122.0 146.012 4.280 -999.990 -999.990 1.460 ..P WKT 2011 02 07 06 59 55 31.3200 -97.3300 251.000 457.0 147.839 4.000 -999.990 -999.990 1.478 ..P WKT 2011 02 07 07 04 55 31.3200 -97.3300 251.000 30.0 145.000 3.770 -999.990 -999.990 1.450 ..P WKT 2011 02 07 07 09 55 31.3200 -97.3300 251.000 122.0 154.495 4.420 -999.990 -999.990 1.545 ..P WKT 2011 02 07 07 14 55 31.3200 -97.3300 251.000 457.0 140.321 3.860 -999.990 -999.990 1.403 ..P WKT 2011 02 07 07 24 55 31.3200 -97.3300 251.000 30.0 131.116 3.750 -999.990 -999.990 1.311 ..P WKT 2011 02 07 07 29 55 31.3200 -97.3300 251.000 122.0 135.420 6.560 -999.990 -999.990 1.354 ..P WKT 2011 02 07 07 34 55 31.3200 -97.3300 251.000 457.0 140.058 3.340 -999.990 -999.990 1.401 ..P WKT 2011 02 07 07 39 55 31.3200 -97.3300 251.000 30.0 132.025 3.720 -999.990 -999.990 1.320 ..P WKT 2011 02 07 07 44 55 31.3200 -97.3300 251.000 122.0 137.997 3.140 -999.990 -999.990 1.380 ..P WKT 2011 02 07 07 49 55 31.3200 -97.3300 251.000 457.0 139.301 2.860 -999.990 -999.990 1.393 ..P WKT 2011 02 07 07 59 55 31.3200 -97.3300 251.000 30.0 139.289 4.150 -999.990 -999.990 1.393 ..P WKT 2011 02 07 08 04 55 31.3200 -97.3300 251.000 122.0 135.303 3.060 -999.990 -999.990 1.353 ..P WKT 2011 02 07 08 09 55 31.3200 -97.3300 251.000 457.0 144.329 3.240 -999.990 -999.990 1.443 ..P WKT 2011 02 07 08 14 55 31.3200 -97.3300 251.000 30.0 136.338 4.400 -999.990 -999.990 1.363 ..P WKT 2011 02 07 08 19 55 31.3200 -97.3300 251.000 122.0 139.025 6.830 -999.990 -999.990 1.390 ..P WKT 2011 02 07 08 24 55 31.3200 -97.3300 251.000 457.0 148.054 3.820 -999.990 -999.990 1.481 ..P WKT 2011 02 07 08 34 55 31.3200 -97.3300 251.000 30.0 136.980 2.920 -999.990 -999.990 1.370 ..P WKT 2011 02 07 08 39 55 31.3200 -97.3300 251.000 122.0 138.237 3.980 -999.990 -999.990 1.382 ..P WKT 2011 02 07 08 44 55 31.3200 -97.3300 251.000 457.0 142.165 3.760 -999.990 -999.990 1.422 ..P WKT 2011 02 07 08 49 55 31.3200 -97.3300 251.000 30.0 135.745 3.990 -999.990 -999.990 1.357 ..P WKT 2011 02 07 08 54 55 31.3200 -97.3300 251.000 122.0 137.503 3.810 -999.990 -999.990 1.375 ..P WKT 2011 02 07 08 59 55 31.3200 -97.3300 251.000 457.0 141.767 2.900 -999.990 -999.990 1.418 ..P WKT 2011 02 07 09 09 55 31.3200 -97.3300 251.000 30.0 130.710 2.760 -999.990 -999.990 1.307 ..P WKT 2011 02 07 09 14 55 31.3200 -97.3300 251.000 122.0 136.429 3.720 -999.990 -999.990 1.364 ..P WKT 2011 02 07 09 19 55 31.3200 -97.3300 251.000 457.0 140.311 3.900 -999.990 -999.990 1.403 ..P WKT 2011 02 07 09 24 55 31.3200 -97.3300 251.000 30.0 136.177 4.980 -999.990 -999.990 1.362 ..P WKT 2011 02 07 09 29 55 31.3200 -97.3300 251.000 122.0 132.043 3.440 -999.990 -999.990 1.320 ..P WKT 2011 02 07 09 34 55 31.3200 -97.3300 251.000 457.0 140.436 5.320 -999.990 -999.990 1.404 ..P WKT 2011 02 07 09 44 55 31.3200 -97.3300 251.000 30.0 139.564 3.560 -999.990 -999.990 1.396 ..P WKT 2011 02 07 09 49 55 31.3200 -97.3300 251.000 122.0 137.648 3.910 -999.990 -999.990 1.376 ..P WKT 2011 02 07 09 54 55 31.3200 -97.3300 251.000 457.0 142.583 4.240 -999.990 -999.990 1.426 ..P WKT 2011 02 07 09 59 55 31.3200 -97.3300 251.000 30.0 137.158 3.180 -999.990 -999.990 1.372 ..P WKT 2011 02 07 10 04 55 31.3200 -97.3300 251.000 122.0 137.748 3.580 -999.990 -999.990 1.377 ..P WKT 2011 02 07 10 09 55 31.3200 -97.3300 251.000 457.0 138.173 3.340 -999.990 -999.990 1.382 ..P WKT 2011 02 07 10 19 55 31.3200 -97.3300 251.000 30.0 132.286 3.640 -999.990 -999.990 1.323 ..P WKT 2011 02 07 10 24 55 31.3200 -97.3300 251.000 122.0 133.163 3.550 -999.990 -999.990 1.332 ..P WKT 2011 02 07 10 29 55 31.3200 -97.3300 251.000 457.0 135.210 3.060 -999.990 -999.990 1.352 ..P WKT 2011 02 07 10 34 55 31.3200 -97.3300 251.000 30.0 131.573 3.090 -999.990 -999.990 1.316 ..P WKT 2011 02 07 10 39 55 31.3200 -97.3300 251.000 122.0 131.447 3.170 -999.990 -999.990 1.314 ..P WKT 2011 02 07 10 44 55 31.3200 -97.3300 251.000 457.0 134.330 2.680 -999.990 -999.990 1.343 ..P WKT 2011 02 07 10 54 55 31.3200 -97.3300 251.000 30.0 134.413 3.230 -999.990 -999.990 1.344 ..P WKT 2011 02 07 10 59 55 31.3200 -97.3300 251.000 122.0 132.782 2.970 -999.990 -999.990 1.328 ..P WKT 2011 02 07 11 04 55 31.3200 -97.3300 251.000 457.0 136.502 2.300 -999.990 -999.990 1.365 ..P WKT 2011 02 07 11 09 55 31.3200 -97.3300 251.000 30.0 138.216 2.400 -999.990 -999.990 1.382 ..P WKT 2011 02 07 11 14 55 31.3200 -97.3300 251.000 122.0 135.247 3.000 -999.990 -999.990 1.352 ..P WKT 2011 02 07 11 19 55 31.3200 -97.3300 251.000 457.0 132.946 2.780 -999.990 -999.990 1.329 ..P WKT 2011 02 07 11 29 55 31.3200 -97.3300 251.000 30.0 134.678 2.860 -999.990 -999.990 1.347 ..P WKT 2011 02 07 11 34 55 31.3200 -97.3300 251.000 122.0 132.018 2.040 -999.990 -999.990 1.320 ..P WKT 2011 02 07 11 39 55 31.3200 -97.3300 251.000 457.0 141.071 2.320 -999.990 -999.990 1.411 ..P WKT 2011 02 07 11 44 55 31.3200 -97.3300 251.000 30.0 131.717 3.060 -999.990 -999.990 1.317 ..P WKT 2011 02 07 11 49 55 31.3200 -97.3300 251.000 122.0 138.763 3.770 -999.990 -999.990 1.388 ..P WKT 2011 02 07 12 09 55 31.3200 -97.3300 251.000 457.0 138.931 2.780 -999.990 -999.990 1.389 ..P WKT 2011 02 07 12 10 25 31.3200 -97.3300 251.000 457.0 136.569 2.770 -999.990 -999.990 1.366 ..P WKT 2011 02 07 12 10 55 31.3200 -97.3300 251.000 457.0 134.878 3.520 -999.990 -999.990 1.349 ..P WKT 2011 02 07 12 11 25 31.3200 -97.3300 251.000 457.0 132.182 2.460 -999.990 -999.990 1.322 ..P WKT 2011 02 07 12 11 55 31.3200 -97.3300 251.000 457.0 139.864 2.800 -999.990 -999.990 1.399 ..P WKT 2011 02 07 12 12 25 31.3200 -97.3300 251.000 457.0 140.851 3.150 -999.990 -999.990 1.409 ..P WKT 2011 02 07 12 12 55 31.3200 -97.3300 251.000 457.0 139.493 3.640 -999.990 -999.990 1.395 ..P WKT 2011 02 07 12 13 25 31.3200 -97.3300 251.000 457.0 140.145 2.520 -999.990 -999.990 1.401 ..P WKT 2011 02 07 12 13 55 31.3200 -97.3300 251.000 457.0 136.445 2.680 -999.990 -999.990 1.364 ..P WKT 2011 02 07 12 14 25 31.3200 -97.3300 251.000 457.0 138.435 3.160 -999.990 -999.990 1.384 ..P WKT 2011 02 07 12 14 55 31.3200 -97.3300 251.000 457.0 137.413 2.700 -999.990 -999.990 1.374 ..P WKT 2011 02 07 12 19 55 31.3200 -97.3300 251.000 30.0 132.550 4.180 -999.990 -999.990 1.326 ..P WKT 2011 02 07 12 24 55 31.3200 -97.3300 251.000 122.0 132.372 2.780 -999.990 -999.990 1.324 ..P WKT 2011 02 07 12 29 55 31.3200 -97.3300 251.000 457.0 133.199 4.850 -999.990 -999.990 1.332 ..P WKT 2011 02 07 12 34 55 31.3200 -97.3300 251.000 30.0 134.694 2.900 -999.990 -999.990 1.347 ..P WKT 2011 02 07 12 39 55 31.3200 -97.3300 251.000 122.0 131.840 3.270 -999.990 -999.990 1.318 ..P WKT 2011 02 07 12 44 55 31.3200 -97.3300 251.000 457.0 139.192 4.100 -999.990 -999.990 1.392 ..P WKT 2011 02 07 12 54 55 31.3200 -97.3300 251.000 30.0 131.761 3.760 -999.990 -999.990 1.318 ..P WKT 2011 02 07 12 59 55 31.3200 -97.3300 251.000 122.0 134.380 3.280 -999.990 -999.990 1.344 ..P WKT 2011 02 07 13 04 55 31.3200 -97.3300 251.000 457.0 143.524 3.090 -999.990 -999.990 1.435 ..P WKT 2011 02 07 13 09 55 31.3200 -97.3300 251.000 30.0 134.933 3.230 -999.990 -999.990 1.349 ..P WKT 2011 02 07 13 14 55 31.3200 -97.3300 251.000 122.0 137.217 3.340 -999.990 -999.990 1.372 ..P WKT 2011 02 07 13 19 55 31.3200 -97.3300 251.000 457.0 139.501 4.170 -999.990 -999.990 1.395 ..P WKT 2011 02 07 13 29 55 31.3200 -97.3300 251.000 30.0 134.892 3.040 -999.990 -999.990 1.349 ..P WKT 2011 02 07 13 34 55 31.3200 -97.3300 251.000 122.0 132.014 3.950 -999.990 -999.990 1.320 ..P WKT 2011 02 07 13 39 55 31.3200 -97.3300 251.000 457.0 135.660 3.890 -999.990 -999.990 1.357 ..P WKT 2011 02 07 13 44 55 31.3200 -97.3300 251.000 30.0 126.594 5.290 -999.990 -999.990 1.266 ..P WKT 2011 02 07 13 49 55 31.3200 -97.3300 251.000 122.0 131.577 4.980 -999.990 -999.990 1.316 ..P WKT 2011 02 07 13 54 55 31.3200 -97.3300 251.000 457.0 135.725 3.740 -999.990 -999.990 1.357 ..P WKT 2011 02 07 14 04 55 31.3200 -97.3300 251.000 30.0 127.246 4.570 -999.990 -999.990 1.272 ..P WKT 2011 02 07 14 09 55 31.3200 -97.3300 251.000 122.0 135.359 3.770 -999.990 -999.990 1.354 ..P WKT 2011 02 07 14 14 55 31.3200 -97.3300 251.000 457.0 133.103 5.480 -999.990 -999.990 1.331 ..P WKT 2011 02 07 14 19 55 31.3200 -97.3300 251.000 30.0 130.847 3.580 -999.990 -999.990 1.308 ..P WKT 2011 02 07 14 24 55 31.3200 -97.3300 251.000 122.0 129.428 2.570 -999.990 -999.990 1.294 ..P WKT 2011 02 07 14 29 55 31.3200 -97.3300 251.000 457.0 138.543 3.160 -999.990 -999.990 1.385 ..P WKT 2011 02 07 14 39 55 31.3200 -97.3300 251.000 30.0 135.153 3.010 -999.990 -999.990 1.352 ..P WKT 2011 02 07 14 44 55 31.3200 -97.3300 251.000 122.0 139.037 3.050 -999.990 -999.990 1.390 ..P WKT 2011 02 07 14 49 55 31.3200 -97.3300 251.000 457.0 145.260 4.510 -999.990 -999.990 1.453 ..P WKT 2011 02 07 14 54 55 31.3200 -97.3300 251.000 30.0 145.966 4.040 -999.990 -999.990 1.460 ..P WKT 2011 02 07 14 59 55 31.3200 -97.3300 251.000 122.0 146.003 3.380 -999.990 -999.990 1.460 ..P WKT 2011 02 07 15 04 55 31.3200 -97.3300 251.000 457.0 139.687 2.430 -999.990 -999.990 1.397 ..P WKT 2011 02 07 15 14 55 31.3200 -97.3300 251.000 30.0 140.765 4.510 -999.990 -999.990 1.408 ..P WKT 2011 02 07 15 19 55 31.3200 -97.3300 251.000 122.0 145.817 3.650 -999.990 -999.990 1.458 ..P WKT 2011 02 07 15 24 55 31.3200 -97.3300 251.000 457.0 144.183 3.100 -999.990 -999.990 1.442 ..P WKT 2011 02 07 15 29 55 31.3200 -97.3300 251.000 30.0 144.554 3.040 -999.990 -999.990 1.446 ..P WKT 2011 02 07 15 34 55 31.3200 -97.3300 251.000 122.0 142.586 3.350 -999.990 -999.990 1.426 ..P WKT 2011 02 07 15 39 55 31.3200 -97.3300 251.000 457.0 144.963 4.510 -999.990 -999.990 1.450 ..P WKT 2011 02 07 15 49 55 31.3200 -97.3300 251.000 30.0 141.552 3.560 -999.990 -999.990 1.416 ..P WKT 2011 02 07 15 54 55 31.3200 -97.3300 251.000 122.0 146.794 4.610 -999.990 -999.990 1.468 ..P WKT 2011 02 07 15 59 55 31.3200 -97.3300 251.000 457.0 145.684 3.790 -999.990 -999.990 1.457 ..P WKT 2011 02 07 16 04 55 31.3200 -97.3300 251.000 30.0 151.928 3.520 -999.990 -999.990 1.519 ..P WKT 2011 02 07 16 09 55 31.3200 -97.3300 251.000 122.0 137.451 4.740 -999.990 -999.990 1.375 ..P WKT 2011 02 07 16 14 55 31.3200 -97.3300 251.000 457.0 139.016 2.320 -999.990 -999.990 1.390 ..P WKT 2011 02 07 16 24 55 31.3200 -97.3300 251.000 30.0 131.786 2.640 -999.990 -999.990 1.318 ..P WKT 2011 02 07 16 29 55 31.3200 -97.3300 251.000 122.0 143.042 2.810 -999.990 -999.990 1.430 ..P WKT 2011 02 07 16 34 55 31.3200 -97.3300 251.000 457.0 137.089 3.790 -999.990 -999.990 1.371 ..P WKT 2011 02 07 16 39 55 31.3200 -97.3300 251.000 30.0 144.834 3.740 -999.990 -999.990 1.448 ..P WKT 2011 02 07 16 44 55 31.3200 -97.3300 251.000 122.0 143.893 2.960 -999.990 -999.990 1.439 ..P WKT 2011 02 07 16 49 55 31.3200 -97.3300 251.000 457.0 143.620 3.080 -999.990 -999.990 1.436 ..P WKT 2011 02 07 17 04 55 31.3200 -97.3300 251.000 30.0 144.704 3.230 -999.990 -999.990 1.447 ..P WKT 2011 02 07 17 09 55 31.3200 -97.3300 251.000 122.0 145.549 3.980 -999.990 -999.990 1.455 ..P WKT 2011 02 07 17 14 55 31.3200 -97.3300 251.000 457.0 143.890 2.790 -999.990 -999.990 1.439 ..P WKT 2011 02 07 17 19 55 31.3200 -97.3300 251.000 30.0 143.566 4.890 -999.990 -999.990 1.436 ..P WKT 2011 02 07 17 24 55 31.3200 -97.3300 251.000 122.0 141.071 2.530 -999.990 -999.990 1.411 ..P WKT 2011 02 07 17 29 55 31.3200 -97.3300 251.000 457.0 144.255 3.480 -999.990 -999.990 1.443 ..P WKT 2011 02 07 17 39 55 31.3200 -97.3300 251.000 30.0 142.370 3.100 -999.990 -999.990 1.424 ..P WKT 2011 02 07 17 44 55 31.3200 -97.3300 251.000 122.0 141.643 2.870 -999.990 -999.990 1.416 ..P WKT 2011 02 07 17 49 55 31.3200 -97.3300 251.000 457.0 144.257 3.400 -999.990 -999.990 1.443 ..P WKT 2011 02 07 17 54 55 31.3200 -97.3300 251.000 30.0 141.194 4.010 -999.990 -999.990 1.412 ..P WKT 2011 02 07 17 59 55 31.3200 -97.3300 251.000 122.0 137.128 4.620 -999.990 -999.990 1.371 ..P WKT 2011 02 07 18 04 55 31.3200 -97.3300 251.000 457.0 134.732 3.440 -999.990 -999.990 1.347 ..P WKT 2011 02 07 18 14 55 31.3200 -97.3300 251.000 30.0 133.448 3.860 -999.990 -999.990 1.334 ..P WKT 2011 02 07 18 19 55 31.3200 -97.3300 251.000 122.0 137.897 2.830 -999.990 -999.990 1.379 ..P WKT 2011 02 07 18 24 55 31.3200 -97.3300 251.000 457.0 133.498 2.860 -999.990 -999.990 1.335 ..P WKT 2011 02 07 18 29 55 31.3200 -97.3300 251.000 30.0 136.111 3.260 -999.990 -999.990 1.361 ..P WKT 2011 02 07 18 34 55 31.3200 -97.3300 251.000 122.0 132.548 3.660 -999.990 -999.990 1.325 ..P WKT 2011 02 07 18 39 55 31.3200 -97.3300 251.000 457.0 136.329 2.620 -999.990 -999.990 1.363 ..P WKT 2011 02 07 18 49 55 31.3200 -97.3300 251.000 30.0 136.785 2.630 -999.990 -999.990 1.368 ..P WKT 2011 02 07 18 54 55 31.3200 -97.3300 251.000 122.0 137.968 2.890 -999.990 -999.990 1.380 ..P WKT 2011 02 07 18 59 55 31.3200 -97.3300 251.000 457.0 139.817 3.590 -999.990 -999.990 1.398 ..P WKT 2011 02 07 19 04 55 31.3200 -97.3300 251.000 30.0 138.996 5.090 -999.990 -999.990 1.390 ..P WKT 2011 02 07 19 09 55 31.3200 -97.3300 251.000 122.0 133.168 4.150 -999.990 -999.990 1.332 ..P WKT 2011 02 07 19 14 55 31.3200 -97.3300 251.000 457.0 136.686 2.920 -999.990 -999.990 1.367 ..P WKT 2011 02 07 19 24 55 31.3200 -97.3300 251.000 30.0 130.325 3.040 -999.990 -999.990 1.303 ..P WKT 2011 02 07 19 29 55 31.3200 -97.3300 251.000 122.0 133.461 3.460 -999.990 -999.990 1.335 ..P WKT 2011 02 07 19 34 55 31.3200 -97.3300 251.000 457.0 129.255 3.640 -999.990 -999.990 1.293 ..P WKT 2011 02 07 19 39 55 31.3200 -97.3300 251.000 30.0 135.729 3.530 -999.990 -999.990 1.357 ..P WKT 2011 02 07 19 44 55 31.3200 -97.3300 251.000 122.0 136.195 3.930 -999.990 -999.990 1.362 ..P WKT 2011 02 07 19 49 55 31.3200 -97.3300 251.000 457.0 131.656 2.740 -999.990 -999.990 1.317 ..P WKT 2011 02 07 19 59 55 31.3200 -97.3300 251.000 30.0 133.471 2.880 -999.990 -999.990 1.335 ..P WKT 2011 02 07 20 04 55 31.3200 -97.3300 251.000 122.0 130.148 3.300 -999.990 -999.990 1.301 ..P WKT 2011 02 07 20 09 55 31.3200 -97.3300 251.000 457.0 129.494 4.490 -999.990 -999.990 1.295 ..P WKT 2011 02 07 20 14 55 31.3200 -97.3300 251.000 30.0 131.844 3.170 -999.990 -999.990 1.318 ..P WKT 2011 02 07 20 19 55 31.3200 -97.3300 251.000 122.0 131.524 2.850 -999.990 -999.990 1.315 ..P WKT 2011 02 07 20 24 55 31.3200 -97.3300 251.000 457.0 135.874 2.660 -999.990 -999.990 1.359 ..P WKT 2011 02 07 20 34 55 31.3200 -97.3300 251.000 30.0 135.401 2.920 -999.990 -999.990 1.354 ..P WKT 2011 02 07 20 39 55 31.3200 -97.3300 251.000 122.0 131.578 3.390 -999.990 -999.990 1.316 ..P WKT 2011 02 07 20 44 55 31.3200 -97.3300 251.000 457.0 131.258 4.300 -999.990 -999.990 1.313 ..P WKT 2011 02 07 20 49 55 31.3200 -97.3300 251.000 30.0 134.107 2.710 -999.990 -999.990 1.341 ..P WKT 2011 02 07 20 54 55 31.3200 -97.3300 251.000 122.0 140.291 3.380 -999.990 -999.990 1.403 ..P WKT 2011 02 07 20 59 55 31.3200 -97.3300 251.000 457.0 129.799 3.550 -999.990 -999.990 1.298 ..P WKT 2011 02 07 21 09 55 31.3200 -97.3300 251.000 30.0 129.540 3.190 -999.990 -999.990 1.295 ..P WKT 2011 02 07 21 14 55 31.3200 -97.3300 251.000 122.0 136.105 3.370 -999.990 -999.990 1.361 ..P WKT 2011 02 07 21 19 55 31.3200 -97.3300 251.000 457.0 134.831 3.030 -999.990 -999.990 1.348 ..P WKT 2011 02 07 21 24 55 31.3200 -97.3300 251.000 30.0 132.225 2.820 -999.990 -999.990 1.322 ..P WKT 2011 02 07 21 29 55 31.3200 -97.3300 251.000 122.0 129.118 2.960 -999.990 -999.990 1.291 ..P WKT 2011 02 07 21 34 55 31.3200 -97.3300 251.000 457.0 132.181 3.910 -999.990 -999.990 1.322 ..P WKT 2011 02 07 21 44 55 31.3200 -97.3300 251.000 30.0 138.686 3.120 -999.990 -999.990 1.387 ..P WKT 2011 02 07 21 49 55 31.3200 -97.3300 251.000 122.0 138.795 3.950 -999.990 -999.990 1.388 ..P WKT 2011 02 07 21 54 55 31.3200 -97.3300 251.000 457.0 130.735 3.060 -999.990 -999.990 1.307 ..P WKT 2011 02 07 21 59 55 31.3200 -97.3300 251.000 30.0 135.345 3.070 -999.990 -999.990 1.353 ..P WKT 2011 02 07 22 04 55 31.3200 -97.3300 251.000 122.0 132.786 3.280 -999.990 -999.990 1.328 ..P WKT 2011 02 07 22 09 55 31.3200 -97.3300 251.000 457.0 132.396 3.620 -999.990 -999.990 1.324 ..P WKT 2011 02 07 22 19 55 31.3200 -97.3300 251.000 30.0 132.066 4.240 -999.990 -999.990 1.321 ..P WKT 2011 02 07 22 24 55 31.3200 -97.3300 251.000 122.0 130.627 4.240 -999.990 -999.990 1.306 ..P WKT 2011 02 07 22 29 55 31.3200 -97.3300 251.000 457.0 128.356 5.020 -999.990 -999.990 1.284 ..P WKT 2011 02 07 22 34 55 31.3200 -97.3300 251.000 30.0 131.583 3.710 -999.990 -999.990 1.316 ..P WKT 2011 02 07 22 39 55 31.3200 -97.3300 251.000 122.0 137.144 3.930 -999.990 -999.990 1.371 ..P WKT 2011 02 07 22 44 55 31.3200 -97.3300 251.000 457.0 136.039 4.020 -999.990 -999.990 1.360 ..P WKT 2011 02 07 22 54 55 31.3200 -97.3300 251.000 30.0 140.755 4.050 -999.990 -999.990 1.408 ..P WKT 2011 02 07 22 59 55 31.3200 -97.3300 251.000 122.0 139.078 3.360 -999.990 -999.990 1.391 ..P WKT 2011 02 07 23 04 55 31.3200 -97.3300 251.000 457.0 137.402 3.230 -999.990 -999.990 1.374 ..P WKT 2011 02 07 23 09 55 31.3200 -97.3300 251.000 30.0 141.223 3.790 -999.990 -999.990 1.412 ..P WKT 2011 02 07 23 14 55 31.3200 -97.3300 251.000 122.0 138.547 3.260 -999.990 -999.990 1.385 ..P WKT 2011 02 07 23 19 55 31.3200 -97.3300 251.000 457.0 137.037 3.220 -999.990 -999.990 1.370 ..P WKT 2011 02 07 23 29 55 31.3200 -97.3300 251.000 30.0 137.453 2.990 -999.990 -999.990 1.375 ..P WKT 2011 02 07 23 34 55 31.3200 -97.3300 251.000 122.0 138.880 3.390 -999.990 -999.990 1.389 ..P WKT 2011 02 07 23 39 55 31.3200 -97.3300 251.000 457.0 137.308 4.440 -999.990 -999.990 1.373 ..P WKT 2011 02 07 23 44 55 31.3200 -97.3300 251.000 30.0 136.235 3.150 -999.990 -999.990 1.362 ..P WKT 2011 02 07 23 49 55 31.3200 -97.3300 251.000 122.0 138.329 2.850 -999.990 -999.990 1.383 ..P WKT 2011 02 08 00 09 55 31.3200 -97.3300 251.000 457.0 139.610 2.590 -999.990 -999.990 1.396 ..P WKT 2011 02 08 00 10 25 31.3200 -97.3300 251.000 457.0 138.211 3.020 -999.990 -999.990 1.382 ..P WKT 2011 02 08 00 10 55 31.3200 -97.3300 251.000 457.0 136.478 2.830 -999.990 -999.990 1.365 ..P WKT 2011 02 08 00 11 25 31.3200 -97.3300 251.000 457.0 133.747 2.580 -999.990 -999.990 1.337 ..P WKT 2011 02 08 00 11 55 31.3200 -97.3300 251.000 457.0 133.346 2.580 -999.990 -999.990 1.333 ..P WKT 2011 02 08 00 12 25 31.3200 -97.3300 251.000 457.0 133.613 3.270 -999.990 -999.990 1.336 ..P WKT 2011 02 08 00 12 55 31.3200 -97.3300 251.000 457.0 132.879 3.340 -999.990 -999.990 1.329 ..P WKT 2011 02 08 00 13 25 31.3200 -97.3300 251.000 457.0 135.810 3.050 -999.990 -999.990 1.358 ..P WKT 2011 02 08 00 13 55 31.3200 -97.3300 251.000 457.0 137.742 5.540 -999.990 -999.990 1.377 ..P WKT 2011 02 08 00 14 25 31.3200 -97.3300 251.000 457.0 139.342 3.320 -999.990 -999.990 1.393 ..P WKT 2011 02 08 00 14 55 31.3200 -97.3300 251.000 457.0 133.943 2.750 -999.990 -999.990 1.339 ..P WKT 2011 02 08 00 19 55 31.3200 -97.3300 251.000 30.0 133.940 2.790 -999.990 -999.990 1.339 ..P WKT 2011 02 08 00 24 55 31.3200 -97.3300 251.000 122.0 134.603 3.770 -999.990 -999.990 1.346 ..P WKT 2011 02 08 00 29 55 31.3200 -97.3300 251.000 457.0 135.599 3.790 -999.990 -999.990 1.356 ..P WKT 2011 02 08 00 34 55 31.3200 -97.3300 251.000 30.0 131.597 3.600 -999.990 -999.990 1.316 ..P WKT 2011 02 08 00 39 55 31.3200 -97.3300 251.000 122.0 135.926 3.240 -999.990 -999.990 1.359 ..P WKT 2011 02 08 00 44 55 31.3200 -97.3300 251.000 457.0 131.256 3.920 -999.990 -999.990 1.313 ..P WKT 2011 02 08 00 54 55 31.3200 -97.3300 251.000 30.0 136.344 3.990 -999.990 -999.990 1.363 ..P WKT 2011 02 08 00 59 55 31.3200 -97.3300 251.000 122.0 136.435 3.660 -999.990 -999.990 1.364 ..P WKT 2011 02 08 01 04 55 31.3200 -97.3300 251.000 457.0 135.527 4.090 -999.990 -999.990 1.355 ..P WKT 2011 02 08 01 09 55 31.3200 -97.3300 251.000 30.0 136.619 3.270 -999.990 -999.990 1.366 ..P WKT 2011 02 08 01 14 55 31.3200 -97.3300 251.000 122.0 135.710 2.930 -999.990 -999.990 1.357 ..P WKT 2011 02 08 01 19 55 31.3200 -97.3300 251.000 457.0 139.137 4.540 -999.990 -999.990 1.391 ..P WKT 2011 02 08 01 29 55 31.3200 -97.3300 251.000 30.0 137.224 3.560 -999.990 -999.990 1.372 ..P WKT 2011 02 08 01 34 55 31.3200 -97.3300 251.000 122.0 137.888 3.120 -999.990 -999.990 1.379 ..P WKT 2011 02 08 01 39 55 31.3200 -97.3300 251.000 457.0 142.888 3.700 -999.990 -999.990 1.429 ..P WKT 2011 02 08 01 44 55 31.3200 -97.3300 251.000 30.0 136.213 4.470 -999.990 -999.990 1.362 ..P WKT 2011 02 08 01 49 55 31.3200 -97.3300 251.000 122.0 136.544 3.520 -999.990 -999.990 1.365 ..P WKT 2011 02 08 01 54 55 31.3200 -97.3300 251.000 457.0 135.874 3.110 -999.990 -999.990 1.359 ..P WKT 2011 02 08 02 04 55 31.3200 -97.3300 251.000 30.0 144.708 4.920 -999.990 -999.990 1.447 ..P WKT 2011 02 08 02 09 55 31.3200 -97.3300 251.000 122.0 154.380 2.970 -999.990 -999.990 1.544 ..P WKT 2011 02 08 02 14 55 31.3200 -97.3300 251.000 457.0 131.855 3.550 -999.990 -999.990 1.319 ..P WKT 2011 02 08 02 19 55 31.3200 -97.3300 251.000 30.0 139.193 3.150 -999.990 -999.990 1.392 ..P WKT 2011 02 08 02 24 55 31.3200 -97.3300 251.000 122.0 142.193 3.400 -999.990 -999.990 1.422 ..P WKT 2011 02 08 02 29 55 31.3200 -97.3300 251.000 457.0 137.518 3.130 -999.990 -999.990 1.375 ..P WKT 2011 02 08 02 39 55 31.3200 -97.3300 251.000 30.0 142.279 3.830 -999.990 -999.990 1.423 ..P WKT 2011 02 08 02 44 55 31.3200 -97.3300 251.000 122.0 137.865 3.350 -999.990 -999.990 1.379 ..P WKT 2011 02 08 02 49 55 31.3200 -97.3300 251.000 457.0 135.120 3.220 -999.990 -999.990 1.351 ..P WKT 2011 02 08 02 54 55 31.3200 -97.3300 251.000 30.0 141.721 3.430 -999.990 -999.990 1.417 ..P WKT 2011 02 08 02 59 55 31.3200 -97.3300 251.000 122.0 134.134 3.610 -999.990 -999.990 1.341 ..P WKT 2011 02 08 03 04 55 31.3200 -97.3300 251.000 457.0 136.062 3.280 -999.990 -999.990 1.361 ..P WKT 2011 02 08 03 14 55 31.3200 -97.3300 251.000 30.0 133.408 3.140 -999.990 -999.990 1.334 ..P WKT 2011 02 08 03 19 55 31.3200 -97.3300 251.000 122.0 129.660 3.900 -999.990 -999.990 1.297 ..P WKT 2011 02 08 03 24 55 31.3200 -97.3300 251.000 457.0 135.095 3.930 -999.990 -999.990 1.351 ..P WKT 2011 02 08 03 29 55 31.3200 -97.3300 251.000 30.0 128.841 4.490 -999.990 -999.990 1.288 ..P WKT 2011 02 08 03 34 55 31.3200 -97.3300 251.000 122.0 131.104 4.420 -999.990 -999.990 1.311 ..P WKT 2011 02 08 03 39 55 31.3200 -97.3300 251.000 457.0 130.527 4.410 -999.990 -999.990 1.305 ..P WKT 2011 02 08 03 49 55 31.3200 -97.3300 251.000 30.0 134.051 3.730 -999.990 -999.990 1.341 ..P WKT 2011 02 08 03 54 55 31.3200 -97.3300 251.000 122.0 134.144 4.530 -999.990 -999.990 1.341 ..P WKT 2011 02 08 03 59 55 31.3200 -97.3300 251.000 457.0 138.412 4.520 -999.990 -999.990 1.384 ..P WKT 2011 02 08 04 04 55 31.3200 -97.3300 251.000 30.0 137.000 4.420 -999.990 -999.990 1.370 ..P WKT 2011 02 08 04 09 55 31.3200 -97.3300 251.000 122.0 135.923 4.080 -999.990 -999.990 1.359 ..P WKT 2011 02 08 04 14 55 31.3200 -97.3300 251.000 457.0 133.508 3.190 -999.990 -999.990 1.335 ..P WKT 2011 02 08 04 24 55 31.3200 -97.3300 251.000 30.0 139.589 4.890 -999.990 -999.990 1.396 ..P WKT 2011 02 08 04 29 55 31.3200 -97.3300 251.000 122.0 130.370 3.900 -999.990 -999.990 1.304 ..P WKT 2011 02 08 04 34 55 31.3200 -97.3300 251.000 457.0 134.520 4.500 -999.990 -999.990 1.345 ..P WKT 2011 02 08 04 39 55 31.3200 -97.3300 251.000 30.0 136.332 3.670 -999.990 -999.990 1.363 ..P WKT 2011 02 08 04 44 55 31.3200 -97.3300 251.000 122.0 139.146 3.780 -999.990 -999.990 1.391 ..P WKT 2011 02 08 04 49 55 31.3200 -97.3300 251.000 457.0 140.624 3.170 -999.990 -999.990 1.406 ..P WKT 2011 02 08 05 04 55 31.3200 -97.3300 251.000 30.0 138.082 4.620 -999.990 -999.990 1.381 ..P WKT 2011 02 08 05 09 55 31.3200 -97.3300 251.000 122.0 133.564 3.550 -999.990 -999.990 1.336 ..P WKT 2011 02 08 05 14 55 31.3200 -97.3300 251.000 457.0 131.721 4.600 -999.990 -999.990 1.317 ..P WKT 2011 02 08 05 19 55 31.3200 -97.3300 251.000 30.0 137.570 4.260 -999.990 -999.990 1.376 ..P WKT 2011 02 08 05 24 55 31.3200 -97.3300 251.000 122.0 132.048 4.750 -999.990 -999.990 1.320 ..P WKT 2011 02 08 05 29 55 31.3200 -97.3300 251.000 457.0 133.884 3.310 -999.990 -999.990 1.339 ..P WKT 2011 02 08 05 39 55 31.3200 -97.3300 251.000 30.0 131.845 3.580 -999.990 -999.990 1.318 ..P WKT 2011 02 08 05 44 55 31.3200 -97.3300 251.000 122.0 130.981 4.500 -999.990 -999.990 1.310 ..P WKT 2011 02 08 05 49 55 31.3200 -97.3300 251.000 457.0 135.137 4.340 -999.990 -999.990 1.351 ..P WKT 2011 02 08 05 54 55 31.3200 -97.3300 251.000 30.0 130.090 4.380 -999.990 -999.990 1.301 ..P WKT 2011 02 08 05 59 55 31.3200 -97.3300 251.000 122.0 133.576 4.470 -999.990 -999.990 1.336 ..P WKT 2011 02 08 06 04 55 31.3200 -97.3300 251.000 457.0 137.397 4.180 -999.990 -999.990 1.374 ..P WKT 2011 02 08 06 14 55 31.3200 -97.3300 251.000 30.0 138.801 5.280 -999.990 -999.990 1.388 ..P WKT 2011 02 08 06 19 55 31.3200 -97.3300 251.000 122.0 133.873 4.580 -999.990 -999.990 1.339 ..P WKT 2011 02 08 06 24 55 31.3200 -97.3300 251.000 457.0 132.793 4.700 -999.990 -999.990 1.328 ..P WKT 2011 02 08 06 29 55 31.3200 -97.3300 251.000 30.0 135.731 4.340 -999.990 -999.990 1.357 ..P WKT 2011 02 08 06 34 55 31.3200 -97.3300 251.000 122.0 132.977 3.900 -999.990 -999.990 1.330 ..P WKT 2011 02 08 06 39 55 31.3200 -97.3300 251.000 457.0 135.245 4.140 -999.990 -999.990 1.352 ..P WKT 2011 02 08 06 49 55 31.3200 -97.3300 251.000 30.0 134.449 4.210 -999.990 -999.990 1.344 ..P WKT 2011 02 08 06 54 55 31.3200 -97.3300 251.000 122.0 135.234 4.220 -999.990 -999.990 1.352 ..P WKT 2011 02 08 06 59 55 31.3200 -97.3300 251.000 457.0 130.160 3.810 -999.990 -999.990 1.302 ..P WKT 2011 02 08 07 04 55 31.3200 -97.3300 251.000 30.0 128.935 4.310 -999.990 -999.990 1.289 ..P WKT 2011 02 08 07 09 55 31.3200 -97.3300 251.000 122.0 130.056 4.240 -999.990 -999.990 1.301 ..P WKT 2011 02 08 07 14 55 31.3200 -97.3300 251.000 457.0 127.660 3.600 -999.990 -999.990 1.277 ..P WKT 2011 02 08 07 24 55 31.3200 -97.3300 251.000 30.0 125.952 3.750 -999.990 -999.990 1.260 ..P WKT 2011 02 08 07 29 55 31.3200 -97.3300 251.000 122.0 127.145 3.890 -999.990 -999.990 1.271 ..P WKT 2011 02 08 07 34 55 31.3200 -97.3300 251.000 457.0 133.028 4.060 -999.990 -999.990 1.330 ..P WKT 2011 02 08 07 39 55 31.3200 -97.3300 251.000 30.0 132.881 3.760 -999.990 -999.990 1.329 ..P WKT 2011 02 08 07 44 55 31.3200 -97.3300 251.000 122.0 133.236 3.690 -999.990 -999.990 1.332 ..P WKT 2011 02 08 07 49 55 31.3200 -97.3300 251.000 457.0 132.587 3.750 -999.990 -999.990 1.326 ..P WKT 2011 02 08 07 59 55 31.3200 -97.3300 251.000 30.0 137.487 4.140 -999.990 -999.990 1.375 ..P WKT 2011 02 08 08 04 55 31.3200 -97.3300 251.000 122.0 141.027 4.070 -999.990 -999.990 1.410 ..P WKT 2011 02 08 08 09 55 31.3200 -97.3300 251.000 457.0 133.506 4.190 -999.990 -999.990 1.335 ..P WKT 2011 02 08 08 14 55 31.3200 -97.3300 251.000 30.0 129.671 3.930 -999.990 -999.990 1.297 ..P WKT 2011 02 08 08 19 55 31.3200 -97.3300 251.000 122.0 130.864 3.920 -999.990 -999.990 1.309 ..P WKT 2011 02 08 08 24 55 31.3200 -97.3300 251.000 457.0 128.370 4.480 -999.990 -999.990 1.284 ..P WKT 2011 02 08 08 34 55 31.3200 -97.3300 251.000 30.0 131.428 3.880 -999.990 -999.990 1.314 ..P WKT 2011 02 08 08 39 55 31.3200 -97.3300 251.000 122.0 140.334 4.370 -999.990 -999.990 1.403 ..P WKT 2011 02 08 08 44 55 31.3200 -97.3300 251.000 457.0 128.115 4.640 -999.990 -999.990 1.281 ..P WKT 2011 02 08 08 49 55 31.3200 -97.3300 251.000 30.0 138.363 4.820 -999.990 -999.990 1.384 ..P WKT 2011 02 08 08 54 55 31.3200 -97.3300 251.000 122.0 141.570 4.100 -999.990 -999.990 1.416 ..P WKT 2011 02 08 08 59 55 31.3200 -97.3300 251.000 457.0 123.311 4.390 -999.990 -999.990 1.233 ..P WKT 2011 02 08 09 09 55 31.3200 -97.3300 251.000 30.0 134.228 3.720 -999.990 -999.990 1.342 ..P WKT 2011 02 08 09 14 55 31.3200 -97.3300 251.000 122.0 145.295 4.540 -999.990 -999.990 1.453 ..P WKT 2011 02 08 09 19 55 31.3200 -97.3300 251.000 457.0 134.557 5.010 -999.990 -999.990 1.346 ..P WKT 2011 02 08 09 24 55 31.3200 -97.3300 251.000 30.0 149.315 5.170 -999.990 -999.990 1.493 ..P WKT 2011 02 08 09 29 55 31.3200 -97.3300 251.000 122.0 141.596 5.350 -999.990 -999.990 1.416 ..P WKT 2011 02 08 09 34 55 31.3200 -97.3300 251.000 457.0 133.204 4.650 -999.990 -999.990 1.332 ..P WKT 2011 02 08 09 44 55 31.3200 -97.3300 251.000 30.0 147.723 4.760 -999.990 -999.990 1.477 ..P WKT 2011 02 08 09 49 55 31.3200 -97.3300 251.000 122.0 142.111 4.970 -999.990 -999.990 1.421 ..P WKT 2011 02 08 09 54 55 31.3200 -97.3300 251.000 457.0 130.624 5.420 -999.990 -999.990 1.306 ..P WKT 2011 02 08 09 59 55 31.3200 -97.3300 251.000 30.0 153.205 5.310 -999.990 -999.990 1.532 ..P WKT 2011 02 08 10 04 55 31.3200 -97.3300 251.000 122.0 139.033 4.340 -999.990 -999.990 1.390 ..P WKT 2011 02 08 10 09 55 31.3200 -97.3300 251.000 457.0 132.915 4.210 -999.990 -999.990 1.329 ..P WKT 2011 02 08 10 19 55 31.3200 -97.3300 251.000 30.0 145.834 4.590 -999.990 -999.990 1.458 ..P WKT 2011 02 08 10 24 55 31.3200 -97.3300 251.000 122.0 134.822 4.390 -999.990 -999.990 1.348 ..P WKT 2011 02 08 10 29 55 31.3200 -97.3300 251.000 457.0 129.351 4.600 -999.990 -999.990 1.294 ..P WKT 2011 02 08 10 34 55 31.3200 -97.3300 251.000 30.0 147.217 4.190 -999.990 -999.990 1.472 ..P WKT 2011 02 08 10 39 55 31.3200 -97.3300 251.000 122.0 144.767 4.710 -999.990 -999.990 1.448 ..P WKT 2011 02 08 10 44 55 31.3200 -97.3300 251.000 457.0 135.936 4.620 -999.990 -999.990 1.359 ..P WKT 2011 02 08 10 54 55 31.3200 -97.3300 251.000 30.0 144.351 5.390 -999.990 -999.990 1.444 ..P WKT 2011 02 08 10 59 55 31.3200 -97.3300 251.000 122.0 152.361 4.470 -999.990 -999.990 1.524 ..P WKT 2011 02 08 11 04 55 31.3200 -97.3300 251.000 457.0 133.834 4.510 -999.990 -999.990 1.338 ..P WKT 2011 02 08 11 09 55 31.3200 -97.3300 251.000 30.0 155.619 4.780 -999.990 -999.990 1.556 ..P WKT 2011 02 08 11 14 55 31.3200 -97.3300 251.000 122.0 154.393 6.130 -999.990 -999.990 1.544 ..P WKT 2011 02 08 11 19 55 31.3200 -97.3300 251.000 457.0 135.024 4.950 -999.990 -999.990 1.350 ..P WKT 2011 02 08 11 29 55 31.3200 -97.3300 251.000 30.0 159.415 4.460 -999.990 -999.990 1.594 ..P WKT 2011 02 08 11 34 55 31.3200 -97.3300 251.000 122.0 146.727 4.700 -999.990 -999.990 1.467 ..P WKT 2011 02 08 11 39 55 31.3200 -97.3300 251.000 457.0 137.902 4.970 -999.990 -999.990 1.379 ..P WKT 2011 02 08 11 44 55 31.3200 -97.3300 251.000 30.0 172.433 4.360 -999.990 -999.990 1.724 ..P WKT 2011 02 08 11 49 55 31.3200 -97.3300 251.000 122.0 153.693 5.020 -999.990 -999.990 1.537 ..P WKT 2011 02 08 12 09 55 31.3200 -97.3300 251.000 457.0 135.793 5.360 -999.990 -999.990 1.358 ..P WKT 2011 02 08 12 10 25 31.3200 -97.3300 251.000 457.0 137.440 4.710 -999.990 -999.990 1.374 ..P WKT 2011 02 08 12 10 55 31.3200 -97.3300 251.000 457.0 136.733 4.750 -999.990 -999.990 1.367 ..P WKT 2011 02 08 12 11 25 31.3200 -97.3300 251.000 457.0 142.076 4.340 -999.990 -999.990 1.421 ..P WKT 2011 02 08 12 11 55 31.3200 -97.3300 251.000 457.0 138.346 4.630 -999.990 -999.990 1.383 ..P WKT 2011 02 08 12 12 25 31.3200 -97.3300 251.000 457.0 136.295 5.360 -999.990 -999.990 1.363 ..P WKT 2011 02 08 12 12 55 31.3200 -97.3300 251.000 457.0 135.589 5.880 -999.990 -999.990 1.356 ..P WKT 2011 02 08 12 13 25 31.3200 -97.3300 251.000 457.0 132.866 7.640 -999.990 -999.990 1.329 ..P WKT 2011 02 08 12 13 55 31.3200 -97.3300 251.000 457.0 138.210 6.390 -999.990 -999.990 1.382 ..P WKT 2011 02 08 12 14 25 31.3200 -97.3300 251.000 457.0 139.520 4.280 -999.990 -999.990 1.395 ..P WKT 2011 02 08 12 14 55 31.3200 -97.3300 251.000 457.0 145.535 4.450 -999.990 -999.990 1.455 ..P WKT 2011 02 08 12 19 55 31.3200 -97.3300 251.000 30.0 185.517 4.840 -999.990 -999.990 1.855 ..P WKT 2011 02 08 12 24 55 31.3200 -97.3300 251.000 122.0 142.837 4.220 -999.990 -999.990 1.428 ..P WKT 2011 02 08 12 29 55 31.3200 -97.3300 251.000 457.0 140.481 4.330 -999.990 -999.990 1.405 ..P WKT 2011 02 08 12 34 55 31.3200 -97.3300 251.000 30.0 180.788 4.950 -999.990 -999.990 1.808 ..P WKT 2011 02 08 12 39 55 31.3200 -97.3300 251.000 122.0 142.488 4.170 -999.990 -999.990 1.425 ..P WKT 2011 02 08 12 44 55 31.3200 -97.3300 251.000 457.0 138.117 4.120 -999.990 -999.990 1.381 ..P WKT 2011 02 08 12 54 55 31.3200 -97.3300 251.000 30.0 168.092 4.490 -999.990 -999.990 1.681 ..P WKT 2011 02 08 12 59 55 31.3200 -97.3300 251.000 122.0 153.406 4.740 -999.990 -999.990 1.534 ..P WKT 2011 02 08 13 04 55 31.3200 -97.3300 251.000 457.0 164.577 5.680 -999.990 -999.990 1.646 ..P WKT 2011 02 08 13 09 55 31.3200 -97.3300 251.000 30.0 166.345 4.480 -999.990 -999.990 1.663 ..P WKT 2011 02 08 13 14 55 31.3200 -97.3300 251.000 122.0 153.007 4.560 -999.990 -999.990 1.530 ..P WKT 2011 02 08 13 19 55 31.3200 -97.3300 251.000 457.0 148.062 4.900 -999.990 -999.990 1.481 ..P WKT 2011 02 08 13 29 55 31.3200 -97.3300 251.000 30.0 167.996 4.930 -999.990 -999.990 1.680 ..P WKT 2011 02 08 13 34 55 31.3200 -97.3300 251.000 122.0 148.910 5.000 -999.990 -999.990 1.489 ..P WKT 2011 02 08 13 39 55 31.3200 -97.3300 251.000 457.0 140.229 5.260 -999.990 -999.990 1.402 ..P WKT 2011 02 08 13 44 55 31.3200 -97.3300 251.000 30.0 163.423 5.590 -999.990 -999.990 1.634 ..P WKT 2011 02 08 13 49 55 31.3200 -97.3300 251.000 122.0 140.484 6.110 -999.990 -999.990 1.405 ..P WKT 2011 02 08 13 54 55 31.3200 -97.3300 251.000 457.0 135.663 7.350 -999.990 -999.990 1.357 ..P WKT 2011 02 08 14 04 55 31.3200 -97.3300 251.000 30.0 154.461 5.580 -999.990 -999.990 1.545 ..P WKT 2011 02 08 14 09 55 31.3200 -97.3300 251.000 122.0 139.173 5.950 -999.990 -999.990 1.392 ..P WKT 2011 02 08 14 14 55 31.3200 -97.3300 251.000 457.0 140.989 5.060 -999.990 -999.990 1.410 ..P WKT 2011 02 08 14 19 55 31.3200 -97.3300 251.000 30.0 156.719 5.880 -999.990 -999.990 1.567 ..P WKT 2011 02 08 14 24 55 31.3200 -97.3300 251.000 122.0 146.632 4.980 -999.990 -999.990 1.466 ..P WKT 2011 02 08 14 29 55 31.3200 -97.3300 251.000 457.0 135.373 4.780 -999.990 -999.990 1.354 ..P WKT 2011 02 08 14 39 55 31.3200 -97.3300 251.000 30.0 154.542 4.590 -999.990 -999.990 1.545 ..P WKT 2011 02 08 14 44 55 31.3200 -97.3300 251.000 122.0 154.130 4.540 -999.990 -999.990 1.541 ..P WKT 2011 02 08 14 49 55 31.3200 -97.3300 251.000 457.0 135.788 4.740 -999.990 -999.990 1.358 ..P WKT 2011 02 08 14 54 55 31.3200 -97.3300 251.000 30.0 160.006 4.860 -999.990 -999.990 1.600 ..P WKT 2011 02 08 14 59 55 31.3200 -97.3300 251.000 122.0 163.447 6.330 -999.990 -999.990 1.634 ..P WKT 2011 02 08 15 04 55 31.3200 -97.3300 251.000 457.0 141.090 4.610 -999.990 -999.990 1.411 ..P WKT 2011 02 08 15 14 55 31.3200 -97.3300 251.000 30.0 163.786 4.690 -999.990 -999.990 1.638 ..P WKT 2011 02 08 15 19 55 31.3200 -97.3300 251.000 122.0 165.120 4.700 -999.990 -999.990 1.651 ..P WKT 2011 02 08 15 24 55 31.3200 -97.3300 251.000 457.0 137.149 5.150 -999.990 -999.990 1.371 ..P WKT 2011 02 08 15 29 55 31.3200 -97.3300 251.000 30.0 161.256 4.810 -999.990 -999.990 1.613 ..P WKT 2011 02 08 15 34 55 31.3200 -97.3300 251.000 122.0 161.752 4.630 -999.990 -999.990 1.618 ..P WKT 2011 02 08 15 39 55 31.3200 -97.3300 251.000 457.0 136.133 4.650 -999.990 -999.990 1.361 ..P WKT 2011 02 08 15 49 55 31.3200 -97.3300 251.000 30.0 164.077 4.700 -999.990 -999.990 1.641 ..P WKT 2011 02 08 15 54 55 31.3200 -97.3300 251.000 122.0 156.372 4.580 -999.990 -999.990 1.564 ..P WKT 2011 02 08 15 59 55 31.3200 -97.3300 251.000 457.0 140.301 4.900 -999.990 -999.990 1.403 ..P WKT 2011 02 08 16 04 55 31.3200 -97.3300 251.000 30.0 157.365 4.760 -999.990 -999.990 1.574 ..P WKT 2011 02 08 16 09 55 31.3200 -97.3300 251.000 122.0 158.028 4.810 -999.990 -999.990 1.580 ..P WKT 2011 02 08 16 14 55 31.3200 -97.3300 251.000 457.0 137.277 4.960 -999.990 -999.990 1.373 ..P WKT 2011 02 08 16 24 55 31.3200 -97.3300 251.000 30.0 155.095 5.220 -999.990 -999.990 1.551 ..P WKT 2011 02 08 16 29 55 31.3200 -97.3300 251.000 122.0 151.840 5.180 -999.990 -999.990 1.518 ..P WKT 2011 02 08 16 34 55 31.3200 -97.3300 251.000 457.0 133.534 4.940 -999.990 -999.990 1.335 ..P WKT 2011 02 08 16 39 55 31.3200 -97.3300 251.000 30.0 150.014 4.950 -999.990 -999.990 1.500 ..P WKT 2011 02 08 16 44 55 31.3200 -97.3300 251.000 122.0 150.105 5.000 -999.990 -999.990 1.501 ..P WKT 2011 02 08 16 49 55 31.3200 -97.3300 251.000 457.0 146.517 4.680 -999.990 -999.990 1.465 ..P WKT 2011 02 08 17 04 55 31.3200 -97.3300 251.000 30.0 161.306 5.680 -999.990 -999.990 1.613 ..P WKT 2011 02 08 17 09 55 31.3200 -97.3300 251.000 122.0 157.623 4.190 -999.990 -999.990 1.576 ..P WKT 2011 02 08 17 14 55 31.3200 -97.3300 251.000 457.0 155.612 4.110 -999.990 -999.990 1.556 ..P WKT 2011 02 08 17 19 55 31.3200 -97.3300 251.000 30.0 159.952 4.260 -999.990 -999.990 1.600 ..P WKT 2011 02 08 17 24 55 31.3200 -97.3300 251.000 122.0 162.619 5.320 -999.990 -999.990 1.626 ..P WKT 2011 02 08 17 29 55 31.3200 -97.3300 251.000 457.0 156.598 4.740 -999.990 -999.990 1.566 ..P WKT 2011 02 08 17 39 55 31.3200 -97.3300 251.000 30.0 162.624 3.730 -999.990 -999.990 1.626 ..P WKT 2011 02 08 17 44 55 31.3200 -97.3300 251.000 122.0 168.655 5.090 -999.990 -999.990 1.687 ..P WKT 2011 02 08 17 49 55 31.3200 -97.3300 251.000 457.0 158.817 3.550 -999.990 -999.990 1.588 ..P WKT 2011 02 08 17 54 55 31.3200 -97.3300 251.000 30.0 170.192 3.920 -999.990 -999.990 1.702 ..P WKT 2011 02 08 17 59 55 31.3200 -97.3300 251.000 122.0 170.542 4.080 -999.990 -999.990 1.705 ..P WKT 2011 02 08 18 04 55 31.3200 -97.3300 251.000 457.0 167.053 4.740 -999.990 -999.990 1.671 ..P WKT 2011 02 08 18 14 55 31.3200 -97.3300 251.000 30.0 165.227 4.640 -999.990 -999.990 1.652 ..P WKT 2011 02 08 18 19 55 31.3200 -97.3300 251.000 122.0 163.050 3.610 -999.990 -999.990 1.631 ..P WKT 2011 02 08 18 24 55 31.3200 -97.3300 251.000 457.0 167.050 3.680 -999.990 -999.990 1.671 ..P WKT 2011 02 08 18 29 55 31.3200 -97.3300 251.000 30.0 161.536 3.540 -999.990 -999.990 1.615 ..P WKT 2011 02 08 18 34 55 31.3200 -97.3300 251.000 122.0 167.036 3.990 -999.990 -999.990 1.670 ..P WKT 2011 02 08 18 39 55 31.3200 -97.3300 251.000 457.0 165.861 4.280 -999.990 -999.990 1.659 ..P WKT 2011 02 08 18 49 55 31.3200 -97.3300 251.000 30.0 164.776 3.930 -999.990 -999.990 1.648 ..P WKT 2011 02 08 18 54 55 31.3200 -97.3300 251.000 122.0 167.700 3.800 -999.990 -999.990 1.677 ..P WKT 2011 02 08 18 59 55 31.3200 -97.3300 251.000 457.0 166.789 3.480 -999.990 -999.990 1.668 ..P WKT 2011 02 08 19 04 55 31.3200 -97.3300 251.000 30.0 162.875 3.850 -999.990 -999.990 1.629 ..P WKT 2011 02 08 19 09 55 31.3200 -97.3300 251.000 122.0 165.299 4.420 -999.990 -999.990 1.653 ..P WKT 2011 02 08 19 14 55 31.3200 -97.3300 251.000 457.0 165.053 3.830 -999.990 -999.990 1.651 ..P WKT 2011 02 08 19 24 55 31.3200 -97.3300 251.000 30.0 158.539 4.220 -999.990 -999.990 1.585 ..P WKT 2011 02 08 19 29 55 31.3200 -97.3300 251.000 122.0 162.939 3.590 -999.990 -999.990 1.629 ..P WKT 2011 02 08 19 34 55 31.3200 -97.3300 251.000 457.0 153.502 4.140 -999.990 -999.990 1.535 ..P WKT 2011 02 08 19 39 55 31.3200 -97.3300 251.000 30.0 157.236 4.000 -999.990 -999.990 1.572 ..P WKT 2011 02 08 19 44 55 31.3200 -97.3300 251.000 122.0 157.301 4.670 -999.990 -999.990 1.573 ..P WKT 2011 02 08 19 49 55 31.3200 -97.3300 251.000 457.0 158.700 5.000 -999.990 -999.990 1.587 ..P WKT 2011 02 08 19 59 55 31.3200 -97.3300 251.000 30.0 152.095 3.990 -999.990 -999.990 1.521 ..P WKT 2011 02 08 20 04 55 31.3200 -97.3300 251.000 122.0 155.088 3.930 -999.990 -999.990 1.551 ..P WKT 2011 02 08 20 09 55 31.3200 -97.3300 251.000 457.0 146.753 3.900 -999.990 -999.990 1.468 ..P WKT 2011 02 08 20 14 55 31.3200 -97.3300 251.000 30.0 160.407 4.100 -999.990 -999.990 1.604 ..P WKT 2011 02 08 20 19 55 31.3200 -97.3300 251.000 122.0 159.735 4.230 -999.990 -999.990 1.597 ..P WKT 2011 02 08 20 24 55 31.3200 -97.3300 251.000 457.0 145.739 4.570 -999.990 -999.990 1.457 ..P WKT 2011 02 08 20 34 55 31.3200 -97.3300 251.000 30.0 152.819 4.790 -999.990 -999.990 1.528 ..P WKT 2011 02 08 20 39 55 31.3200 -97.3300 251.000 122.0 150.578 4.950 -999.990 -999.990 1.506 ..P WKT 2011 02 08 20 44 55 31.3200 -97.3300 251.000 457.0 148.670 5.160 -999.990 -999.990 1.487 ..P WKT 2011 02 08 20 49 55 31.3200 -97.3300 251.000 30.0 157.084 4.910 -999.990 -999.990 1.571 ..P WKT 2011 02 08 20 54 55 31.3200 -97.3300 251.000 122.0 151.181 4.840 -999.990 -999.990 1.512 ..P WKT 2011 02 08 20 59 55 31.3200 -97.3300 251.000 457.0 147.942 5.260 -999.990 -999.990 1.479 ..P WKT 2011 02 08 21 09 55 31.3200 -97.3300 251.000 30.0 145.103 4.740 -999.990 -999.990 1.451 ..P WKT 2011 02 08 21 14 55 31.3200 -97.3300 251.000 122.0 144.171 4.540 -999.990 -999.990 1.442 ..P WKT 2011 02 08 21 19 55 31.3200 -97.3300 251.000 457.0 137.583 4.940 -999.990 -999.990 1.376 ..P WKT 2011 02 08 21 24 55 31.3200 -97.3300 251.000 30.0 145.303 6.210 -999.990 -999.990 1.453 ..P WKT 2011 02 08 21 29 55 31.3200 -97.3300 251.000 122.0 141.045 4.300 -999.990 -999.990 1.410 ..P WKT 2011 02 08 21 34 55 31.3200 -97.3300 251.000 457.0 141.278 3.940 -999.990 -999.990 1.413 ..P WKT 2011 02 08 21 44 55 31.3200 -97.3300 251.000 30.0 145.188 4.260 -999.990 -999.990 1.452 ..P WKT 2011 02 08 21 49 55 31.3200 -97.3300 251.000 122.0 147.037 3.750 -999.990 -999.990 1.470 ..P WKT 2011 02 08 21 54 55 31.3200 -97.3300 251.000 457.0 142.733 3.680 -999.990 -999.990 1.427 ..P WKT 2011 02 08 21 59 55 31.3200 -97.3300 251.000 30.0 140.425 3.260 -999.990 -999.990 1.404 ..P WKT 2011 02 08 22 04 55 31.3200 -97.3300 251.000 122.0 141.442 3.480 -999.990 -999.990 1.414 ..P WKT 2011 02 08 22 09 55 31.3200 -97.3300 251.000 457.0 138.303 3.350 -999.990 -999.990 1.383 ..P WKT 2011 02 08 22 19 55 31.3200 -97.3300 251.000 30.0 146.866 3.350 -999.990 -999.990 1.469 ..P WKT 2011 02 08 22 24 55 31.3200 -97.3300 251.000 122.0 138.623 3.710 -999.990 -999.990 1.386 ..P WKT 2011 02 08 22 29 55 31.3200 -97.3300 251.000 457.0 144.839 3.320 -999.990 -999.990 1.448 ..P WKT 2011 02 08 22 34 55 31.3200 -97.3300 251.000 30.0 143.409 4.110 -999.990 -999.990 1.434 ..P WKT 2011 02 08 22 39 55 31.3200 -97.3300 251.000 122.0 138.492 3.310 -999.990 -999.990 1.385 ..P WKT 2011 02 08 22 44 55 31.3200 -97.3300 251.000 457.0 141.882 3.300 -999.990 -999.990 1.419 ..P WKT 2011 02 08 22 54 55 31.3200 -97.3300 251.000 30.0 149.941 4.440 -999.990 -999.990 1.499 ..P WKT 2011 02 08 22 59 55 31.3200 -97.3300 251.000 122.0 146.803 4.730 -999.990 -999.990 1.468 ..P WKT 2011 02 08 23 04 55 31.3200 -97.3300 251.000 457.0 144.000 4.910 -999.990 -999.990 1.440 ..P WKT 2011 02 08 23 09 55 31.3200 -97.3300 251.000 30.0 149.166 6.070 -999.990 -999.990 1.492 ..P WKT 2011 02 08 23 14 55 31.3200 -97.3300 251.000 122.0 148.521 5.260 -999.990 -999.990 1.485 ..P WKT 2011 02 08 23 19 55 31.3200 -97.3300 251.000 457.0 146.548 5.990 -999.990 -999.990 1.465 ..P WKT 2011 02 08 23 29 55 31.3200 -97.3300 251.000 30.0 151.645 5.440 -999.990 -999.990 1.516 ..P WKT 2011 02 08 23 34 55 31.3200 -97.3300 251.000 122.0 151.578 4.940 -999.990 -999.990 1.516 ..P WKT 2011 02 08 23 39 55 31.3200 -97.3300 251.000 457.0 149.353 6.030 -999.990 -999.990 1.494 ..P WKT 2011 02 08 23 44 55 31.3200 -97.3300 251.000 30.0 148.456 6.330 -999.990 -999.990 1.485 ..P WKT 2011 02 08 23 49 55 31.3200 -97.3300 251.000 122.0 149.218 4.300 -999.990 -999.990 1.492 ..P WKT 2011 02 09 00 09 55 31.3200 -97.3300 251.000 457.0 142.045 3.870 -999.990 -999.990 1.420 ..P WKT 2011 02 09 00 10 25 31.3200 -97.3300 251.000 457.0 146.009 3.020 -999.990 -999.990 1.460 ..P WKT 2011 02 09 00 10 55 31.3200 -97.3300 251.000 457.0 144.332 3.080 -999.990 -999.990 1.443 ..P WKT 2011 02 09 00 11 25 31.3200 -97.3300 251.000 457.0 139.668 3.590 -999.990 -999.990 1.397 ..P WKT 2011 02 09 00 11 55 31.3200 -97.3300 251.000 457.0 144.960 5.390 -999.990 -999.990 1.450 ..P WKT 2011 02 09 00 12 25 31.3200 -97.3300 251.000 457.0 145.274 5.070 -999.990 -999.990 1.453 ..P WKT 2011 02 09 00 12 55 31.3200 -97.3300 251.000 457.0 141.938 3.930 -999.990 -999.990 1.419 ..P WKT 2011 02 09 00 13 25 31.3200 -97.3300 251.000 457.0 144.575 3.710 -999.990 -999.990 1.446 ..P WKT 2011 02 09 00 13 55 31.3200 -97.3300 251.000 457.0 143.894 3.550 -999.990 -999.990 1.439 ..P WKT 2011 02 09 00 14 25 31.3200 -97.3300 251.000 457.0 145.203 4.300 -999.990 -999.990 1.452 ..P WKT 2011 02 09 00 14 55 31.3200 -97.3300 251.000 457.0 145.849 4.280 -999.990 -999.990 1.458 ..P WKT 2011 02 09 00 19 55 31.3200 -97.3300 251.000 30.0 144.676 3.990 -999.990 -999.990 1.447 ..P WKT 2011 02 09 00 24 55 31.3200 -97.3300 251.000 122.0 145.162 3.770 -999.990 -999.990 1.452 ..P WKT 2011 02 09 00 29 55 31.3200 -97.3300 251.000 457.0 152.619 3.710 -999.990 -999.990 1.526 ..P WKT 2011 02 09 00 34 55 31.3200 -97.3300 251.000 30.0 144.475 3.060 -999.990 -999.990 1.445 ..P WKT 2011 02 09 00 39 55 31.3200 -97.3300 251.000 122.0 147.950 4.410 -999.990 -999.990 1.479 ..P WKT 2011 02 09 00 44 55 31.3200 -97.3300 251.000 457.0 145.447 3.270 -999.990 -999.990 1.454 ..P WKT 2011 02 09 00 54 55 31.3200 -97.3300 251.000 30.0 149.404 4.630 -999.990 -999.990 1.494 ..P WKT 2011 02 09 00 59 55 31.3200 -97.3300 251.000 122.0 143.909 3.300 -999.990 -999.990 1.439 ..P WKT 2011 02 09 01 04 55 31.3200 -97.3300 251.000 457.0 143.393 2.860 -999.990 -999.990 1.434 ..P WKT 2011 02 09 01 09 55 31.3200 -97.3300 251.000 30.0 149.189 3.420 -999.990 -999.990 1.492 ..P WKT 2011 02 09 01 14 55 31.3200 -97.3300 251.000 122.0 145.352 3.120 -999.990 -999.990 1.454 ..P WKT 2011 02 09 01 19 55 31.3200 -97.3300 251.000 457.0 141.183 4.050 -999.990 -999.990 1.412 ..P WKT 2011 02 09 01 29 55 31.3200 -97.3300 251.000 30.0 143.380 3.380 -999.990 -999.990 1.434 ..P WKT 2011 02 09 01 34 55 31.3200 -97.3300 251.000 122.0 148.916 3.420 -999.990 -999.990 1.489 ..P WKT 2011 02 09 01 39 55 31.3200 -97.3300 251.000 457.0 144.983 3.500 -999.990 -999.990 1.450 ..P WKT 2011 02 09 01 44 55 31.3200 -97.3300 251.000 30.0 145.370 3.590 -999.990 -999.990 1.454 ..P WKT 2011 02 09 01 49 55 31.3200 -97.3300 251.000 122.0 148.249 4.020 -999.990 -999.990 1.482 ..P WKT 2011 02 09 01 54 55 31.3200 -97.3300 251.000 457.0 148.636 3.680 -999.990 -999.990 1.486 ..P WKT 2011 02 09 02 04 55 31.3200 -97.3300 251.000 30.0 141.433 4.600 -999.990 -999.990 1.414 ..P WKT 2011 02 09 02 09 55 31.3200 -97.3300 251.000 122.0 150.462 3.940 -999.990 -999.990 1.505 ..P WKT 2011 02 09 02 14 55 31.3200 -97.3300 251.000 457.0 150.683 3.860 -999.990 -999.990 1.507 ..P WKT 2011 02 09 02 19 55 31.3200 -97.3300 251.000 30.0 151.736 3.600 -999.990 -999.990 1.517 ..P WKT 2011 02 09 02 24 55 31.3200 -97.3300 251.000 122.0 144.641 3.290 -999.990 -999.990 1.446 ..P WKT 2011 02 09 02 29 55 31.3200 -97.3300 251.000 457.0 154.338 3.610 -999.990 -999.990 1.543 ..P WKT 2011 02 09 02 39 55 31.3200 -97.3300 251.000 30.0 169.580 3.510 -999.990 -999.990 1.696 ..P WKT 2011 02 09 02 44 55 31.3200 -97.3300 251.000 122.0 163.650 3.500 -999.990 -999.990 1.637 ..P WKT 2011 02 09 02 49 55 31.3200 -97.3300 251.000 457.0 161.544 4.400 -999.990 -999.990 1.615 ..P WKT 2011 02 09 02 54 55 31.3200 -97.3300 251.000 30.0 169.915 4.860 -999.990 -999.990 1.699 ..P WKT 2011 02 09 02 59 55 31.3200 -97.3300 251.000 122.0 166.644 6.190 -999.990 -999.990 1.666 ..P WKT 2011 02 09 03 04 55 31.3200 -97.3300 251.000 457.0 164.039 4.880 -999.990 -999.990 1.640 ..P WKT 2011 02 09 03 14 55 31.3200 -97.3300 251.000 30.0 165.932 4.920 -999.990 -999.990 1.659 ..P WKT 2011 02 09 03 19 55 31.3200 -97.3300 251.000 122.0 163.778 4.930 -999.990 -999.990 1.638 ..P WKT 2011 02 09 03 24 55 31.3200 -97.3300 251.000 457.0 154.302 5.720 -999.990 -999.990 1.543 ..P WKT 2011 02 09 03 29 55 31.3200 -97.3300 251.000 30.0 156.140 5.050 -999.990 -999.990 1.561 ..P WKT 2011 02 09 03 34 55 31.3200 -97.3300 251.000 122.0 160.808 5.270 -999.990 -999.990 1.608 ..P WKT 2011 02 09 03 39 55 31.3200 -97.3300 251.000 457.0 155.158 4.890 -999.990 -999.990 1.552 ..P WKT 2011 02 09 03 49 55 31.3200 -97.3300 251.000 30.0 157.027 4.350 -999.990 -999.990 1.570 ..P WKT 2011 02 09 03 54 55 31.3200 -97.3300 251.000 122.0 167.879 6.330 -999.990 -999.990 1.679 ..P WKT 2011 02 09 03 59 55 31.3200 -97.3300 251.000 457.0 160.753 5.080 -999.990 -999.990 1.608 ..P WKT 2011 02 09 04 04 55 31.3200 -97.3300 251.000 30.0 164.614 5.600 -999.990 -999.990 1.646 ..P WKT 2011 02 09 04 09 55 31.3200 -97.3300 251.000 122.0 163.148 4.000 -999.990 -999.990 1.631 ..P WKT 2011 02 09 04 14 55 31.3200 -97.3300 251.000 457.0 167.009 3.760 -999.990 -999.990 1.670 ..P WKT 2011 02 09 04 24 55 31.3200 -97.3300 251.000 30.0 171.641 4.520 -999.990 -999.990 1.716 ..P WKT 2011 02 09 04 29 55 31.3200 -97.3300 251.000 122.0 174.077 4.030 -999.990 -999.990 1.741 ..P WKT 2011 02 09 04 34 55 31.3200 -97.3300 251.000 457.0 169.850 3.830 -999.990 -999.990 1.698 ..P WKT 2011 02 09 04 39 55 31.3200 -97.3300 251.000 30.0 172.286 3.890 -999.990 -999.990 1.723 ..P WKT 2011 02 09 04 44 55 31.3200 -97.3300 251.000 122.0 176.721 3.320 -999.990 -999.990 1.767 ..P WKT 2011 02 09 04 49 55 31.3200 -97.3300 251.000 457.0 170.828 3.610 -999.990 -999.990 1.708 ..P WKT 2011 02 09 05 04 55 31.3200 -97.3300 251.000 30.0 171.450 3.590 -999.990 -999.990 1.714 ..P WKT 2011 02 09 05 09 55 31.3200 -97.3300 251.000 122.0 174.874 3.880 -999.990 -999.990 1.749 ..P WKT 2011 02 09 05 14 55 31.3200 -97.3300 251.000 457.0 172.301 4.520 -999.990 -999.990 1.723 ..P WKT 2011 02 09 05 19 55 31.3200 -97.3300 251.000 30.0 172.726 3.620 -999.990 -999.990 1.727 ..P WKT 2011 02 09 05 24 55 31.3200 -97.3300 251.000 122.0 170.151 3.810 -999.990 -999.990 1.702 ..P WKT 2011 02 09 05 29 55 31.3200 -97.3300 251.000 457.0 168.077 3.750 -999.990 -999.990 1.681 ..P WKT 2011 02 09 05 39 55 31.3200 -97.3300 251.000 30.0 171.750 4.310 -999.990 -999.990 1.718 ..P WKT 2011 02 09 05 44 55 31.3200 -97.3300 251.000 122.0 167.828 4.610 -999.990 -999.990 1.678 ..P WKT 2011 02 09 05 49 55 31.3200 -97.3300 251.000 457.0 166.241 3.870 -999.990 -999.990 1.662 ..P WKT 2011 02 09 05 54 55 31.3200 -97.3300 251.000 30.0 163.319 4.350 -999.990 -999.990 1.633 ..P WKT 2011 02 09 05 59 55 31.3200 -97.3300 251.000 122.0 169.903 3.600 -999.990 -999.990 1.699 ..P WKT 2011 02 09 06 04 55 31.3200 -97.3300 251.000 457.0 162.145 3.500 -999.990 -999.990 1.621 ..P WKT 2011 02 09 06 14 55 31.3200 -97.3300 251.000 30.0 171.763 3.730 -999.990 -999.990 1.718 ..P WKT 2011 02 09 06 19 55 31.3200 -97.3300 251.000 122.0 163.290 3.680 -999.990 -999.990 1.633 ..P WKT 2011 02 09 06 24 55 31.3200 -97.3300 251.000 457.0 152.812 3.740 -999.990 -999.990 1.528 ..P WKT 2011 02 09 06 29 55 31.3200 -97.3300 251.000 30.0 154.178 5.060 -999.990 -999.990 1.542 ..P WKT 2011 02 09 06 34 55 31.3200 -97.3300 251.000 122.0 153.041 4.450 -999.990 -999.990 1.530 ..P WKT 2011 02 09 06 39 55 31.3200 -97.3300 251.000 457.0 153.574 4.270 -999.990 -999.990 1.536 ..P WKT 2011 02 09 06 49 55 31.3200 -97.3300 251.000 30.0 155.615 4.840 -999.990 -999.990 1.556 ..P WKT 2011 02 09 06 54 55 31.3200 -97.3300 251.000 122.0 161.631 4.460 -999.990 -999.990 1.616 ..P WKT 2011 02 09 06 59 55 31.3200 -97.3300 251.000 457.0 157.299 5.180 -999.990 -999.990 1.573 ..P WKT 2011 02 09 07 04 55 31.3200 -97.3300 251.000 30.0 160.479 5.930 -999.990 -999.990 1.605 ..P WKT 2011 02 09 07 09 55 31.3200 -97.3300 251.000 122.0 156.981 6.020 -999.990 -999.990 1.570 ..P WKT 2011 02 09 07 14 55 31.3200 -97.3300 251.000 457.0 158.157 4.950 -999.990 -999.990 1.582 ..P WKT 2011 02 09 07 24 55 31.3200 -97.3300 251.000 30.0 155.048 4.170 -999.990 -999.990 1.550 ..P WKT 2011 02 09 07 29 55 31.3200 -97.3300 251.000 122.0 152.599 5.310 -999.990 -999.990 1.526 ..P WKT 2011 02 09 07 34 55 31.3200 -97.3300 251.000 457.0 154.658 6.310 -999.990 -999.990 1.547 ..P WKT 2011 02 09 07 39 55 31.3200 -97.3300 251.000 30.0 150.705 4.950 -999.990 -999.990 1.507 ..P WKT 2011 02 09 07 44 55 31.3200 -97.3300 251.000 122.0 156.773 4.630 -999.990 -999.990 1.568 ..P WKT 2011 02 09 07 49 55 31.3200 -97.3300 251.000 457.0 154.490 4.050 -999.990 -999.990 1.545 ..P WKT 2011 02 09 07 59 55 31.3200 -97.3300 251.000 30.0 155.412 3.620 -999.990 -999.990 1.554 ..P WKT 2011 02 09 08 04 55 31.3200 -97.3300 251.000 122.0 152.269 4.850 -999.990 -999.990 1.523 ..P WKT 2011 02 09 08 09 55 31.3200 -97.3300 251.000 457.0 149.126 5.070 -999.990 -999.990 1.491 ..P WKT 2011 02 09 08 14 55 31.3200 -97.3300 251.000 30.0 151.330 5.100 -999.990 -999.990 1.513 ..P WKT 2011 02 09 08 19 55 31.3200 -97.3300 251.000 122.0 149.189 3.500 -999.990 -999.990 1.492 ..P WKT 2011 02 09 08 24 55 31.3200 -97.3300 251.000 457.0 152.060 3.400 -999.990 -999.990 1.521 ..P WKT 2011 02 09 08 34 55 31.3200 -97.3300 251.000 30.0 153.173 3.400 -999.990 -999.990 1.532 ..P WKT 2011 02 09 08 39 55 31.3200 -97.3300 251.000 122.0 152.417 3.510 -999.990 -999.990 1.524 ..P WKT 2011 02 09 08 44 55 31.3200 -97.3300 251.000 457.0 151.994 3.940 -999.990 -999.990 1.520 ..P WKT 2011 02 09 08 49 55 31.3200 -97.3300 251.000 30.0 156.588 3.990 -999.990 -999.990 1.566 ..P WKT 2011 02 09 08 54 55 31.3200 -97.3300 251.000 122.0 152.153 4.000 -999.990 -999.990 1.522 ..P WKT 2011 02 09 08 59 55 31.3200 -97.3300 251.000 457.0 154.071 3.920 -999.990 -999.990 1.541 ..P WKT 2011 02 09 09 09 55 31.3200 -97.3300 251.000 30.0 153.943 3.780 -999.990 -999.990 1.539 ..P WKT 2011 02 09 09 14 55 31.3200 -97.3300 251.000 122.0 153.234 3.790 -999.990 -999.990 1.532 ..P WKT 2011 02 09 09 19 55 31.3200 -97.3300 251.000 457.0 145.501 4.420 -999.990 -999.990 1.455 ..P WKT 2011 02 09 09 24 55 31.3200 -97.3300 251.000 30.0 144.122 3.850 -999.990 -999.990 1.441 ..P WKT 2011 02 09 09 29 55 31.3200 -97.3300 251.000 122.0 152.612 3.880 -999.990 -999.990 1.526 ..P WKT 2011 02 09 09 34 55 31.3200 -97.3300 251.000 457.0 143.705 4.690 -999.990 -999.990 1.437 ..P WKT 2011 02 09 09 44 55 31.3200 -97.3300 251.000 30.0 148.475 6.140 -999.990 -999.990 1.485 ..P WKT 2011 02 09 09 49 55 31.3200 -97.3300 251.000 122.0 151.112 3.940 -999.990 -999.990 1.511 ..P WKT 2011 02 09 09 54 55 31.3200 -97.3300 251.000 457.0 146.387 4.590 -999.990 -999.990 1.464 ..P WKT 2011 02 09 09 59 55 31.3200 -97.3300 251.000 30.0 155.381 3.880 -999.990 -999.990 1.554 ..P WKT 2011 02 09 10 04 55 31.3200 -97.3300 251.000 122.0 147.476 3.750 -999.990 -999.990 1.475 ..P WKT 2011 02 09 10 09 55 31.3200 -97.3300 251.000 457.0 139.569 4.220 -999.990 -999.990 1.396 ..P WKT 2011 02 09 10 19 55 31.3200 -97.3300 251.000 30.0 145.273 4.010 -999.990 -999.990 1.453 ..P WKT 2011 02 09 10 24 55 31.3200 -97.3300 251.000 122.0 148.844 4.750 -999.990 -999.990 1.488 ..P WKT 2011 02 09 10 29 55 31.3200 -97.3300 251.000 457.0 144.881 3.990 -999.990 -999.990 1.449 ..P WKT 2011 02 09 10 34 55 31.3200 -97.3300 251.000 30.0 152.302 3.790 -999.990 -999.990 1.523 ..P WKT 2011 02 09 10 39 55 31.3200 -97.3300 251.000 122.0 151.855 3.830 -999.990 -999.990 1.519 ..P WKT 2011 02 09 10 44 55 31.3200 -97.3300 251.000 457.0 152.078 3.600 -999.990 -999.990 1.521 ..P WKT 2011 02 09 10 54 55 31.3200 -97.3300 251.000 30.0 152.595 4.060 -999.990 -999.990 1.526 ..P WKT 2011 02 09 10 59 55 31.3200 -97.3300 251.000 122.0 157.244 5.350 -999.990 -999.990 1.572 ..P WKT 2011 02 09 11 04 55 31.3200 -97.3300 251.000 457.0 150.002 4.150 -999.990 -999.990 1.500 ..P WKT 2011 02 09 11 09 55 31.3200 -97.3300 251.000 30.0 146.276 4.640 -999.990 -999.990 1.463 ..P WKT 2011 02 09 11 14 55 31.3200 -97.3300 251.000 122.0 145.062 4.570 -999.990 -999.990 1.451 ..P WKT 2011 02 09 11 19 55 31.3200 -97.3300 251.000 457.0 142.844 4.060 -999.990 -999.990 1.428 ..P WKT 2011 02 09 11 29 55 31.3200 -97.3300 251.000 30.0 137.950 4.000 -999.990 -999.990 1.379 ..P WKT 2011 02 09 11 34 55 31.3200 -97.3300 251.000 122.0 141.141 4.240 -999.990 -999.990 1.411 ..P WKT 2011 02 09 11 39 55 31.3200 -97.3300 251.000 457.0 143.997 4.420 -999.990 -999.990 1.440 ..P WKT 2011 02 09 11 44 55 31.3200 -97.3300 251.000 30.0 141.489 4.530 -999.990 -999.990 1.415 ..P WKT 2011 02 09 11 49 55 31.3200 -97.3300 251.000 122.0 153.061 4.540 -999.990 -999.990 1.531 ..P WKT 2011 02 09 12 09 55 31.3200 -97.3300 251.000 457.0 152.264 3.700 -999.990 -999.990 1.523 ..P WKT 2011 02 09 12 10 25 31.3200 -97.3300 251.000 457.0 153.240 3.540 -999.990 -999.990 1.532 ..P WKT 2011 02 09 12 10 55 31.3200 -97.3300 251.000 457.0 150.527 3.860 -999.990 -999.990 1.505 ..P WKT 2011 02 09 12 11 25 31.3200 -97.3300 251.000 457.0 150.162 4.110 -999.990 -999.990 1.502 ..P WKT 2011 02 09 12 11 55 31.3200 -97.3300 251.000 457.0 151.138 4.290 -999.990 -999.990 1.511 ..P WKT 2011 02 09 12 12 25 31.3200 -97.3300 251.000 457.0 153.119 3.830 -999.990 -999.990 1.531 ..P WKT 2011 02 09 12 12 55 31.3200 -97.3300 251.000 457.0 151.748 3.960 -999.990 -999.990 1.517 ..P WKT 2011 02 09 12 13 25 31.3200 -97.3300 251.000 457.0 155.406 4.770 -999.990 -999.990 1.554 ..P WKT 2011 02 09 12 13 55 31.3200 -97.3300 251.000 457.0 157.387 4.200 -999.990 -999.990 1.574 ..P WKT 2011 02 09 12 14 25 31.3200 -97.3300 251.000 457.0 155.346 4.380 -999.990 -999.990 1.553 ..P WKT 2011 02 09 12 14 55 31.3200 -97.3300 251.000 457.0 152.634 4.070 -999.990 -999.990 1.526 ..P WKT 2011 02 09 12 19 55 31.3200 -97.3300 251.000 30.0 151.997 4.140 -999.990 -999.990 1.520 ..P WKT 2011 02 09 12 24 55 31.3200 -97.3300 251.000 122.0 145.325 4.760 -999.990 -999.990 1.453 ..P WKT 2011 02 09 12 29 55 31.3200 -97.3300 251.000 457.0 149.383 3.940 -999.990 -999.990 1.494 ..P WKT 2011 02 09 12 34 55 31.3200 -97.3300 251.000 30.0 144.052 3.580 -999.990 -999.990 1.441 ..P WKT 2011 02 09 12 39 55 31.3200 -97.3300 251.000 122.0 150.123 4.220 -999.990 -999.990 1.501 ..P WKT 2011 02 09 12 44 55 31.3200 -97.3300 251.000 457.0 151.163 4.050 -999.990 -999.990 1.512 ..P WKT 2011 02 09 12 54 55 31.3200 -97.3300 251.000 30.0 149.758 5.230 -999.990 -999.990 1.498 ..P WKT 2011 02 09 12 59 55 31.3200 -97.3300 251.000 122.0 148.652 3.980 -999.990 -999.990 1.487 ..P WKT 2011 02 09 13 04 55 31.3200 -97.3300 251.000 457.0 161.301 4.450 -999.990 -999.990 1.613 ..P WKT 2011 02 09 13 09 55 31.3200 -97.3300 251.000 30.0 152.816 3.940 -999.990 -999.990 1.528 ..P WKT 2011 02 09 13 14 55 31.3200 -97.3300 251.000 122.0 152.382 5.190 -999.990 -999.990 1.524 ..P WKT 2011 02 09 13 19 55 31.3200 -97.3300 251.000 457.0 156.141 4.280 -999.990 -999.990 1.561 ..P WKT 2011 02 09 13 29 55 31.3200 -97.3300 251.000 30.0 150.505 4.780 -999.990 -999.990 1.505 ..P WKT 2011 02 09 13 34 55 31.3200 -97.3300 251.000 122.0 149.663 4.400 -999.990 -999.990 1.497 ..P WKT 2011 02 09 13 39 55 31.3200 -97.3300 251.000 457.0 154.860 4.110 -999.990 -999.990 1.549 ..P WKT 2011 02 09 13 44 55 31.3200 -97.3300 251.000 30.0 152.006 4.670 -999.990 -999.990 1.520 ..P WKT 2011 02 09 13 49 55 31.3200 -97.3300 251.000 122.0 157.875 3.990 -999.990 -999.990 1.579 ..P WKT 2011 02 09 13 54 55 31.3200 -97.3300 251.000 457.0 156.195 3.740 -999.990 -999.990 1.562 ..P WKT 2011 02 09 14 04 55 31.3200 -97.3300 251.000 30.0 156.261 3.740 -999.990 -999.990 1.563 ..P WKT 2011 02 09 14 09 55 31.3200 -97.3300 251.000 122.0 154.484 4.040 -999.990 -999.990 1.545 ..P WKT 2011 02 09 14 14 55 31.3200 -97.3300 251.000 457.0 148.344 4.390 -999.990 -999.990 1.483 ..P WKT 2011 02 09 14 19 55 31.3200 -97.3300 251.000 30.0 153.783 4.760 -999.990 -999.990 1.538 ..P WKT 2011 02 09 14 24 55 31.3200 -97.3300 251.000 122.0 151.000 4.290 -999.990 -999.990 1.510 ..P WKT 2011 02 09 14 29 55 31.3200 -97.3300 251.000 457.0 148.719 4.080 -999.990 -999.990 1.487 ..P WKT 2011 02 09 14 39 55 31.3200 -97.3300 251.000 30.0 147.370 4.810 -999.990 -999.990 1.474 ..P WKT 2011 02 09 14 44 55 31.3200 -97.3300 251.000 122.0 151.996 4.320 -999.990 -999.990 1.520 ..P WKT 2011 02 09 14 49 55 31.3200 -97.3300 251.000 457.0 150.075 4.800 -999.990 -999.990 1.501 ..P WKT 2011 02 09 14 54 55 31.3200 -97.3300 251.000 30.0 146.810 4.120 -999.990 -999.990 1.468 ..P WKT 2011 02 09 14 59 55 31.3200 -97.3300 251.000 122.0 154.961 4.320 -999.990 -999.990 1.550 ..P WKT 2011 02 09 15 04 55 31.3200 -97.3300 251.000 457.0 150.186 5.900 -999.990 -999.990 1.502 ..P WKT 2011 02 09 15 14 55 31.3200 -97.3300 251.000 30.0 148.477 5.630 -999.990 -999.990 1.485 ..P WKT 2011 02 09 15 19 55 31.3200 -97.3300 251.000 122.0 152.552 4.870 -999.990 -999.990 1.526 ..P WKT 2011 02 09 15 24 55 31.3200 -97.3300 251.000 457.0 150.582 4.920 -999.990 -999.990 1.506 ..P WKT 2011 02 09 15 29 55 31.3200 -97.3300 251.000 30.0 143.407 5.080 -999.990 -999.990 1.434 ..P WKT 2011 02 09 15 34 55 31.3200 -97.3300 251.000 122.0 146.642 5.250 -999.990 -999.990 1.466 ..P WKT 2011 02 09 15 39 55 31.3200 -97.3300 251.000 457.0 149.542 5.450 -999.990 -999.990 1.495 ..P WKT 2011 02 09 15 49 55 31.3200 -97.3300 251.000 30.0 155.270 5.890 -999.990 -999.990 1.553 ..P WKT 2011 02 09 15 54 55 31.3200 -97.3300 251.000 122.0 157.763 6.430 -999.990 -999.990 1.578 ..P WKT 2011 02 09 15 59 55 31.3200 -97.3300 251.000 457.0 155.553 5.560 -999.990 -999.990 1.556 ..P WKT 2011 02 09 16 04 55 31.3200 -97.3300 251.000 30.0 148.640 4.460 -999.990 -999.990 1.486 ..P WKT 2011 02 09 16 09 55 31.3200 -97.3300 251.000 122.0 153.484 4.470 -999.990 -999.990 1.535 ..P WKT 2011 02 09 16 14 55 31.3200 -97.3300 251.000 457.0 149.258 4.060 -999.990 -999.990 1.493 ..P WKT 2011 02 09 16 24 55 31.3200 -97.3300 251.000 30.0 144.933 4.230 -999.990 -999.990 1.449 ..P WKT 2011 02 09 16 29 55 31.3200 -97.3300 251.000 122.0 147.857 4.040 -999.990 -999.990 1.479 ..P WKT 2011 02 09 16 34 55 31.3200 -97.3300 251.000 457.0 145.743 4.380 -999.990 -999.990 1.457 ..P WKT 2011 02 09 16 39 55 31.3200 -97.3300 251.000 30.0 147.324 5.000 -999.990 -999.990 1.473 ..P WKT 2011 02 09 16 44 55 31.3200 -97.3300 251.000 122.0 151.593 4.900 -999.990 -999.990 1.516 ..P WKT 2011 02 09 16 49 55 31.3200 -97.3300 251.000 457.0 145.446 4.090 -999.990 -999.990 1.454 ..P WKT 2011 02 09 17 04 55 31.3200 -97.3300 251.000 30.0 153.112 4.540 -999.990 -999.990 1.531 ..P WKT 2011 02 09 17 09 55 31.3200 -97.3300 251.000 122.0 144.392 4.870 -999.990 -999.990 1.444 ..P WKT 2011 02 09 17 14 55 31.3200 -97.3300 251.000 457.0 146.594 5.340 -999.990 -999.990 1.466 ..P WKT 2011 02 09 17 19 55 31.3200 -97.3300 251.000 30.0 151.317 5.520 -999.990 -999.990 1.513 ..P WKT 2011 02 09 17 24 55 31.3200 -97.3300 251.000 122.0 142.260 4.870 -999.990 -999.990 1.423 ..P WKT 2011 02 09 17 29 55 31.3200 -97.3300 251.000 457.0 145.976 4.740 -999.990 -999.990 1.460 ..P WKT 2011 02 09 17 39 55 31.3200 -97.3300 251.000 30.0 143.901 5.010 -999.990 -999.990 1.439 ..P WKT 2011 02 09 17 44 55 31.3200 -97.3300 251.000 122.0 147.188 5.080 -999.990 -999.990 1.472 ..P WKT 2011 02 09 17 49 55 31.3200 -97.3300 251.000 457.0 150.811 5.570 -999.990 -999.990 1.508 ..P WKT 2011 02 09 17 54 55 31.3200 -97.3300 251.000 30.0 148.719 6.100 -999.990 -999.990 1.487 ..P WKT 2011 02 09 17 59 55 31.3200 -97.3300 251.000 122.0 149.653 5.390 -999.990 -999.990 1.497 ..P WKT 2011 02 09 18 04 55 31.3200 -97.3300 251.000 457.0 151.091 5.080 -999.990 -999.990 1.511 ..P WKT 2011 02 09 18 14 55 31.3200 -97.3300 251.000 30.0 156.201 5.250 -999.990 -999.990 1.562 ..P WKT 2011 02 09 18 19 55 31.3200 -97.3300 251.000 122.0 146.591 4.860 -999.990 -999.990 1.466 ..P WKT 2011 02 09 18 24 55 31.3200 -97.3300 251.000 457.0 149.086 7.090 -999.990 -999.990 1.491 ..P WKT 2011 02 09 18 29 55 31.3200 -97.3300 251.000 30.0 146.705 5.370 -999.990 -999.990 1.467 ..P WKT 2011 02 09 18 34 55 31.3200 -97.3300 251.000 122.0 146.678 6.000 -999.990 -999.990 1.467 ..P WKT 2011 02 09 18 39 55 31.3200 -97.3300 251.000 457.0 141.606 5.150 -999.990 -999.990 1.416 ..P WKT 2011 02 09 18 49 55 31.3200 -97.3300 251.000 30.0 143.738 4.390 -999.990 -999.990 1.437 ..P WKT 2011 02 09 18 54 55 31.3200 -97.3300 251.000 122.0 148.588 5.340 -999.990 -999.990 1.486 ..P WKT 2011 02 09 18 59 55 31.3200 -97.3300 251.000 457.0 145.366 5.410 -999.990 -999.990 1.454 ..P WKT 2011 02 09 19 04 55 31.3200 -97.3300 251.000 30.0 150.889 5.320 -999.990 -999.990 1.509 ..P WKT 2011 02 09 19 09 55 31.3200 -97.3300 251.000 122.0 149.685 5.310 -999.990 -999.990 1.497 ..P WKT 2011 02 09 19 14 55 31.3200 -97.3300 251.000 457.0 152.349 4.290 -999.990 -999.990 1.523 ..P WKT 2011 02 09 19 24 55 31.3200 -97.3300 251.000 30.0 150.493 4.680 -999.990 -999.990 1.505 ..P WKT 2011 02 09 19 29 55 31.3200 -97.3300 251.000 122.0 150.009 5.620 -999.990 -999.990 1.500 ..P WKT 2011 02 09 19 34 55 31.3200 -97.3300 251.000 457.0 143.469 5.210 -999.990 -999.990 1.435 ..P WKT 2011 02 09 19 39 55 31.3200 -97.3300 251.000 30.0 146.014 5.320 -999.990 -999.990 1.460 ..P WKT 2011 02 09 19 44 55 31.3200 -97.3300 251.000 122.0 144.856 4.710 -999.990 -999.990 1.449 ..P WKT 2011 02 09 19 49 55 31.3200 -97.3300 251.000 457.0 148.411 4.620 -999.990 -999.990 1.484 ..P WKT 2011 02 09 19 59 55 31.3200 -97.3300 251.000 30.0 147.588 5.360 -999.990 -999.990 1.476 ..P WKT 2011 02 09 20 04 55 31.3200 -97.3300 251.000 122.0 146.239 4.790 -999.990 -999.990 1.462 ..P WKT 2011 02 09 20 09 55 31.3200 -97.3300 251.000 457.0 150.948 4.880 -999.990 -999.990 1.509 ..P WKT 2011 02 09 20 14 55 31.3200 -97.3300 251.000 30.0 140.511 4.760 -999.990 -999.990 1.405 ..P WKT 2011 02 09 20 19 55 31.3200 -97.3300 251.000 122.0 149.259 4.350 -999.990 -999.990 1.493 ..P WKT 2011 02 09 20 24 55 31.3200 -97.3300 251.000 457.0 147.574 4.440 -999.990 -999.990 1.476 ..P WKT 2011 02 09 20 34 55 31.3200 -97.3300 251.000 30.0 152.809 4.630 -999.990 -999.990 1.528 ..P WKT 2011 02 09 20 39 55 31.3200 -97.3300 251.000 122.0 151.652 4.860 -999.990 -999.990 1.517 ..P WKT 2011 02 09 20 44 55 31.3200 -97.3300 251.000 457.0 151.168 4.680 -999.990 -999.990 1.512 ..P WKT 2011 02 09 20 49 55 31.3200 -97.3300 251.000 30.0 151.694 4.850 -999.990 -999.990 1.517 ..P WKT 2011 02 09 20 54 55 31.3200 -97.3300 251.000 122.0 149.863 4.470 -999.990 -999.990 1.499 ..P WKT 2011 02 09 20 59 55 31.3200 -97.3300 251.000 457.0 156.451 4.390 -999.990 -999.990 1.565 ..P WKT 2011 02 09 21 09 55 31.3200 -97.3300 251.000 30.0 147.089 4.580 -999.990 -999.990 1.471 ..P WKT 2011 02 09 21 14 55 31.3200 -97.3300 251.000 122.0 147.976 5.420 -999.990 -999.990 1.480 ..P WKT 2011 02 09 21 19 55 31.3200 -97.3300 251.000 457.0 144.317 4.790 -999.990 -999.990 1.443 ..P WKT 2011 02 09 21 24 55 31.3200 -97.3300 251.000 30.0 147.898 4.510 -999.990 -999.990 1.479 ..P WKT 2011 02 09 21 29 55 31.3200 -97.3300 251.000 122.0 139.692 5.290 -999.990 -999.990 1.397 ..P WKT 2011 02 09 21 34 55 31.3200 -97.3300 251.000 457.0 139.063 4.910 -999.990 -999.990 1.391 ..P WKT 2011 02 09 21 44 55 31.3200 -97.3300 251.000 30.0 145.793 4.890 -999.990 -999.990 1.458 ..P WKT 2011 02 09 21 49 55 31.3200 -97.3300 251.000 122.0 148.100 4.910 -999.990 -999.990 1.481 ..P WKT 2011 02 09 21 54 55 31.3200 -97.3300 251.000 457.0 145.522 5.570 -999.990 -999.990 1.455 ..P WKT 2011 02 09 21 59 55 31.3200 -97.3300 251.000 30.0 146.145 5.490 -999.990 -999.990 1.461 ..P WKT 2011 02 09 22 04 55 31.3200 -97.3300 251.000 122.0 144.915 6.640 -999.990 -999.990 1.449 ..P WKT 2011 02 09 22 09 55 31.3200 -97.3300 251.000 457.0 144.696 5.970 -999.990 -999.990 1.447 ..P WKT 2011 02 09 22 19 55 31.3200 -97.3300 251.000 30.0 142.330 5.930 -999.990 -999.990 1.423 ..P WKT 2011 02 09 22 24 55 31.3200 -97.3300 251.000 122.0 146.588 5.870 -999.990 -999.990 1.466 ..P WKT 2011 02 09 22 29 55 31.3200 -97.3300 251.000 457.0 140.399 5.990 -999.990 -999.990 1.404 ..P WKT 2011 02 09 22 34 55 31.3200 -97.3300 251.000 30.0 138.254 6.110 -999.990 -999.990 1.383 ..P WKT 2011 02 09 22 39 55 31.3200 -97.3300 251.000 122.0 138.972 5.470 -999.990 -999.990 1.390 ..P WKT 2011 02 09 22 44 55 31.3200 -97.3300 251.000 457.0 138.680 4.810 -999.990 -999.990 1.387 ..P WKT 2011 02 09 22 54 55 31.3200 -97.3300 251.000 30.0 143.247 4.890 -999.990 -999.990 1.432 ..P WKT 2011 02 09 22 59 55 31.3200 -97.3300 251.000 122.0 135.637 5.330 -999.990 -999.990 1.356 ..P WKT 2011 02 09 23 04 55 31.3200 -97.3300 251.000 457.0 141.001 6.370 -999.990 -999.990 1.410 ..P WKT 2011 02 09 23 09 55 31.3200 -97.3300 251.000 30.0 140.469 6.150 -999.990 -999.990 1.405 ..P WKT 2011 02 09 23 14 55 31.3200 -97.3300 251.000 122.0 149.542 5.190 -999.990 -999.990 1.495 ..P WKT 2011 02 09 23 19 55 31.3200 -97.3300 251.000 457.0 140.414 4.850 -999.990 -999.990 1.404 ..P WKT 2011 02 09 23 29 55 31.3200 -97.3300 251.000 30.0 148.685 4.540 -999.990 -999.990 1.487 ..P WKT 2011 02 09 23 34 55 31.3200 -97.3300 251.000 122.0 142.150 5.430 -999.990 -999.990 1.421 ..P WKT 2011 02 09 23 39 55 31.3200 -97.3300 251.000 457.0 142.020 5.670 -999.990 -999.990 1.420 ..P WKT 2011 02 09 23 44 55 31.3200 -97.3300 251.000 30.0 140.542 5.930 -999.990 -999.990 1.405 ..P WKT 2011 02 09 23 49 55 31.3200 -97.3300 251.000 122.0 139.739 4.890 -999.990 -999.990 1.397 ..P WKT 2011 02 10 00 09 55 31.3200 -97.3300 251.000 457.0 139.558 4.840 -999.990 -999.990 1.396 ..P WKT 2011 02 10 00 10 25 31.3200 -97.3300 251.000 457.0 133.879 6.330 -999.990 -999.990 1.339 ..P WKT 2011 02 10 00 10 55 31.3200 -97.3300 251.000 457.0 137.641 5.610 -999.990 -999.990 1.376 ..P WKT 2011 02 10 00 11 25 31.3200 -97.3300 251.000 457.0 139.379 5.220 -999.990 -999.990 1.394 ..P WKT 2011 02 10 00 11 55 31.3200 -97.3300 251.000 457.0 137.746 5.470 -999.990 -999.990 1.377 ..P WKT 2011 02 10 00 12 25 31.3200 -97.3300 251.000 457.0 142.182 5.060 -999.990 -999.990 1.422 ..P WKT 2011 02 10 00 12 55 31.3200 -97.3300 251.000 457.0 137.852 4.790 -999.990 -999.990 1.379 ..P WKT 2011 02 10 00 13 25 31.3200 -97.3300 251.000 457.0 138.241 4.830 -999.990 -999.990 1.382 ..P WKT 2011 02 10 00 13 55 31.3200 -97.3300 251.000 457.0 137.957 4.910 -999.990 -999.990 1.380 ..P WKT 2011 02 10 00 14 25 31.3200 -97.3300 251.000 457.0 138.010 4.900 -999.990 -999.990 1.380 ..P WKT 2011 02 10 00 14 55 31.3200 -97.3300 251.000 457.0 137.052 4.750 -999.990 -999.990 1.371 ..P WKT 2011 02 10 00 19 55 31.3200 -97.3300 251.000 30.0 140.950 6.300 -999.990 -999.990 1.409 ..P WKT 2011 02 10 00 24 55 31.3200 -97.3300 251.000 122.0 136.758 4.990 -999.990 -999.990 1.368 ..P WKT 2011 02 10 00 29 55 31.3200 -97.3300 251.000 457.0 138.297 4.680 -999.990 -999.990 1.383 ..P WKT 2011 02 10 00 34 55 31.3200 -97.3300 251.000 30.0 143.208 4.650 -999.990 -999.990 1.432 ..P WKT 2011 02 10 00 39 55 31.3200 -97.3300 251.000 122.0 145.758 4.760 -999.990 -999.990 1.458 ..P WKT 2011 02 10 00 44 55 31.3200 -97.3300 251.000 457.0 148.645 4.490 -999.990 -999.990 1.486 ..P WKT 2011 02 10 00 54 55 31.3200 -97.3300 251.000 30.0 150.283 4.580 -999.990 -999.990 1.503 ..P WKT 2011 02 10 00 59 55 31.3200 -97.3300 251.000 122.0 146.338 4.730 -999.990 -999.990 1.463 ..P WKT 2011 02 10 01 04 55 31.3200 -97.3300 251.000 457.0 144.752 5.520 -999.990 -999.990 1.448 ..P WKT 2011 02 10 01 09 55 31.3200 -97.3300 251.000 30.0 153.278 6.730 -999.990 -999.990 1.533 ..P WKT 2011 02 10 01 14 55 31.3200 -97.3300 251.000 122.0 144.614 5.700 -999.990 -999.990 1.446 ..P WKT 2011 02 10 01 19 55 31.3200 -97.3300 251.000 457.0 138.141 5.010 -999.990 -999.990 1.381 ..P WKT 2011 02 10 01 29 55 31.3200 -97.3300 251.000 30.0 138.075 5.580 -999.990 -999.990 1.381 ..P WKT 2011 02 10 01 34 55 31.3200 -97.3300 251.000 122.0 141.449 5.820 -999.990 -999.990 1.414 ..P WKT 2011 02 10 01 39 55 31.3200 -97.3300 251.000 457.0 136.397 6.240 -999.990 -999.990 1.364 ..P WKT 2011 02 10 01 44 55 31.3200 -97.3300 251.000 30.0 134.210 5.890 -999.990 -999.990 1.342 ..P WKT 2011 02 10 01 49 55 31.3200 -97.3300 251.000 122.0 132.865 6.380 -999.990 -999.990 1.329 ..P WKT 2011 02 10 01 54 55 31.3200 -97.3300 251.000 457.0 133.711 6.140 -999.990 -999.990 1.337 ..P WKT 2011 02 10 02 04 55 31.3200 -97.3300 251.000 30.0 130.325 5.790 -999.990 -999.990 1.303 ..P WKT 2011 02 10 02 09 55 31.3200 -97.3300 251.000 122.0 131.483 5.770 -999.990 -999.990 1.315 ..P WKT 2011 02 10 02 14 55 31.3200 -97.3300 251.000 457.0 133.316 6.380 -999.990 -999.990 1.333 ..P WKT 2011 02 10 02 19 55 31.3200 -97.3300 251.000 30.0 131.948 5.190 -999.990 -999.990 1.319 ..P WKT 2011 02 10 02 24 55 31.3200 -97.3300 251.000 122.0 137.823 5.600 -999.990 -999.990 1.378 ..P WKT 2011 02 10 02 29 55 31.3200 -97.3300 251.000 457.0 135.613 4.860 -999.990 -999.990 1.356 ..P WKT 2011 02 10 02 39 55 31.3200 -97.3300 251.000 30.0 131.865 5.360 -999.990 -999.990 1.319 ..P WKT 2011 02 10 02 44 55 31.3200 -97.3300 251.000 122.0 132.856 5.440 -999.990 -999.990 1.329 ..P WKT 2011 02 10 02 49 55 31.3200 -97.3300 251.000 457.0 139.741 5.650 -999.990 -999.990 1.397 ..P WKT 2011 02 10 02 54 55 31.3200 -97.3300 251.000 30.0 136.015 5.380 -999.990 -999.990 1.360 ..P WKT 2011 02 10 02 59 55 31.3200 -97.3300 251.000 122.0 127.405 6.120 -999.990 -999.990 1.274 ..P WKT 2011 02 10 03 04 55 31.3200 -97.3300 251.000 457.0 127.721 5.770 -999.990 -999.990 1.277 ..P WKT 2011 02 10 03 14 55 31.3200 -97.3300 251.000 30.0 133.238 6.080 -999.990 -999.990 1.332 ..P WKT 2011 02 10 03 19 55 31.3200 -97.3300 251.000 122.0 131.702 5.650 -999.990 -999.990 1.317 ..P WKT 2011 02 10 03 24 55 31.3200 -97.3300 251.000 457.0 140.270 5.080 -999.990 -999.990 1.403 ..P WKT 2011 02 10 03 29 55 31.3200 -97.3300 251.000 30.0 132.334 5.100 -999.990 -999.990 1.323 ..P WKT 2011 02 10 03 34 55 31.3200 -97.3300 251.000 122.0 129.450 4.460 -999.990 -999.990 1.294 ..P WKT 2011 02 10 03 39 55 31.3200 -97.3300 251.000 457.0 139.029 4.950 -999.990 -999.990 1.390 ..P WKT 2011 02 10 03 49 55 31.3200 -97.3300 251.000 30.0 134.417 5.660 -999.990 -999.990 1.344 ..P WKT 2011 02 10 03 54 55 31.3200 -97.3300 251.000 122.0 139.424 4.530 -999.990 -999.990 1.394 ..P WKT 2011 02 10 03 59 55 31.3200 -97.3300 251.000 457.0 138.032 4.560 -999.990 -999.990 1.380 ..P WKT 2011 02 10 04 04 55 31.3200 -97.3300 251.000 30.0 136.304 4.550 -999.990 -999.990 1.363 ..P WKT 2011 02 10 04 09 55 31.3200 -97.3300 251.000 122.0 128.851 4.660 -999.990 -999.990 1.289 ..P WKT 2011 02 10 04 14 55 31.3200 -97.3300 251.000 457.0 130.827 5.330 -999.990 -999.990 1.308 ..P WKT 2011 02 10 04 24 55 31.3200 -97.3300 251.000 30.0 127.610 5.160 -999.990 -999.990 1.276 ..P WKT 2011 02 10 04 29 55 31.3200 -97.3300 251.000 122.0 130.837 4.660 -999.990 -999.990 1.308 ..P WKT 2011 02 10 04 34 55 31.3200 -97.3300 251.000 457.0 130.023 4.560 -999.990 -999.990 1.300 ..P WKT 2011 02 10 04 39 55 31.3200 -97.3300 251.000 30.0 130.556 4.480 -999.990 -999.990 1.306 ..P WKT 2011 02 10 04 44 55 31.3200 -97.3300 251.000 122.0 134.792 4.410 -999.990 -999.990 1.348 ..P WKT 2011 02 10 04 49 55 31.3200 -97.3300 251.000 457.0 135.660 4.640 -999.990 -999.990 1.357 ..P WKT 2011 02 10 05 04 55 31.3200 -97.3300 251.000 30.0 135.863 4.290 -999.990 -999.990 1.359 ..P WKT 2011 02 10 05 09 55 31.3200 -97.3300 251.000 122.0 133.510 4.680 -999.990 -999.990 1.335 ..P WKT 2011 02 10 05 14 55 31.3200 -97.3300 251.000 457.0 130.315 4.640 -999.990 -999.990 1.303 ..P WKT 2011 02 10 05 19 55 31.3200 -97.3300 251.000 30.0 133.181 4.680 -999.990 -999.990 1.332 ..P WKT 2011 02 10 05 24 55 31.3200 -97.3300 251.000 122.0 131.837 4.210 -999.990 -999.990 1.318 ..P WKT 2011 02 10 05 29 55 31.3200 -97.3300 251.000 457.0 134.198 4.610 -999.990 -999.990 1.342 ..P WKT 2011 02 10 05 39 55 31.3200 -97.3300 251.000 30.0 130.141 5.000 -999.990 -999.990 1.301 ..P WKT 2011 02 10 05 44 55 31.3200 -97.3300 251.000 122.0 129.952 4.500 -999.990 -999.990 1.300 ..P WKT 2011 02 10 05 49 55 31.3200 -97.3300 251.000 457.0 130.605 4.930 -999.990 -999.990 1.306 ..P WKT 2011 02 10 05 54 55 31.3200 -97.3300 251.000 30.0 136.138 4.160 -999.990 -999.990 1.361 ..P WKT 2011 02 10 05 59 55 31.3200 -97.3300 251.000 122.0 134.266 4.490 -999.990 -999.990 1.343 ..P WKT 2011 02 10 06 04 55 31.3200 -97.3300 251.000 457.0 141.313 4.550 -999.990 -999.990 1.413 ..P WKT 2011 02 10 06 14 55 31.3200 -97.3300 251.000 30.0 134.973 4.640 -999.990 -999.990 1.350 ..P WKT 2011 02 10 06 19 55 31.3200 -97.3300 251.000 122.0 134.545 4.040 -999.990 -999.990 1.345 ..P WKT 2011 02 10 06 24 55 31.3200 -97.3300 251.000 457.0 135.461 4.320 -999.990 -999.990 1.355 ..P WKT 2011 02 10 06 29 55 31.3200 -97.3300 251.000 30.0 140.080 4.130 -999.990 -999.990 1.401 ..P WKT 2011 02 10 06 34 55 31.3200 -97.3300 251.000 122.0 138.977 4.610 -999.990 -999.990 1.390 ..P WKT 2011 02 10 06 39 55 31.3200 -97.3300 251.000 457.0 134.847 4.530 -999.990 -999.990 1.348 ..P WKT 2011 02 10 06 49 55 31.3200 -97.3300 251.000 30.0 138.531 4.130 -999.990 -999.990 1.385 ..P WKT 2011 02 10 06 54 55 31.3200 -97.3300 251.000 122.0 137.766 4.030 -999.990 -999.990 1.378 ..P WKT 2011 02 10 06 59 55 31.3200 -97.3300 251.000 457.0 144.065 5.200 -999.990 -999.990 1.441 ..P WKT 2011 02 10 07 04 55 31.3200 -97.3300 251.000 30.0 142.795 4.220 -999.990 -999.990 1.428 ..P WKT 2011 02 10 07 09 55 31.3200 -97.3300 251.000 122.0 142.870 4.270 -999.990 -999.990 1.429 ..P WKT 2011 02 10 07 14 55 31.3200 -97.3300 251.000 457.0 143.282 4.300 -999.990 -999.990 1.433 ..P WKT 2011 02 10 07 24 55 31.3200 -97.3300 251.000 30.0 141.534 3.950 -999.990 -999.990 1.415 ..P WKT 2011 02 10 07 29 55 31.3200 -97.3300 251.000 122.0 136.684 4.510 -999.990 -999.990 1.367 ..P WKT 2011 02 10 07 34 55 31.3200 -97.3300 251.000 457.0 141.589 4.630 -999.990 -999.990 1.416 ..P WKT 2011 02 10 07 39 55 31.3200 -97.3300 251.000 30.0 135.392 4.000 -999.990 -999.990 1.354 ..P WKT 2011 02 10 07 44 55 31.3200 -97.3300 251.000 122.0 137.606 4.020 -999.990 -999.990 1.376 ..P WKT 2011 02 10 07 49 55 31.3200 -97.3300 251.000 457.0 140.493 4.720 -999.990 -999.990 1.405 ..P WKT 2011 02 10 07 59 55 31.3200 -97.3300 251.000 30.0 136.704 4.300 -999.990 -999.990 1.367 ..P WKT 2011 02 10 08 04 55 31.3200 -97.3300 251.000 122.0 139.446 5.710 -999.990 -999.990 1.394 ..P WKT 2011 02 10 08 09 55 31.3200 -97.3300 251.000 457.0 143.534 4.100 -999.990 -999.990 1.435 ..P WKT 2011 02 10 08 14 55 31.3200 -97.3300 251.000 30.0 138.876 4.170 -999.990 -999.990 1.389 ..P WKT 2011 02 10 08 19 55 31.3200 -97.3300 251.000 122.0 138.927 4.190 -999.990 -999.990 1.389 ..P WKT 2011 02 10 08 24 55 31.3200 -97.3300 251.000 457.0 137.970 3.860 -999.990 -999.990 1.380 ..P WKT 2011 02 10 08 34 55 31.3200 -97.3300 251.000 30.0 139.082 4.130 -999.990 -999.990 1.391 ..P WKT 2011 02 10 08 39 55 31.3200 -97.3300 251.000 122.0 145.185 3.970 -999.990 -999.990 1.452 ..P WKT 2011 02 10 08 44 55 31.3200 -97.3300 251.000 457.0 136.158 3.950 -999.990 -999.990 1.362 ..P WKT 2011 02 10 08 49 55 31.3200 -97.3300 251.000 30.0 134.864 4.570 -999.990 -999.990 1.349 ..P WKT 2011 02 10 08 54 55 31.3200 -97.3300 251.000 122.0 140.968 4.210 -999.990 -999.990 1.410 ..P WKT 2011 02 10 08 59 55 31.3200 -97.3300 251.000 457.0 139.338 7.200 -999.990 -999.990 1.393 ..P WKT 2011 02 10 09 09 55 31.3200 -97.3300 251.000 30.0 136.319 4.290 -999.990 -999.990 1.363 ..P WKT 2011 02 10 09 14 55 31.3200 -97.3300 251.000 122.0 137.787 4.190 -999.990 -999.990 1.378 ..P WKT 2011 02 10 09 19 55 31.3200 -97.3300 251.000 457.0 137.238 4.140 -999.990 -999.990 1.372 ..P WKT 2011 02 10 09 24 55 31.3200 -97.3300 251.000 30.0 132.823 5.150 -999.990 -999.990 1.328 ..P WKT 2011 02 10 09 29 55 31.3200 -97.3300 251.000 122.0 137.821 4.050 -999.990 -999.990 1.378 ..P WKT 2011 02 10 09 34 55 31.3200 -97.3300 251.000 457.0 133.238 4.220 -999.990 -999.990 1.332 ..P WKT 2011 02 10 09 44 55 31.3200 -97.3300 251.000 30.0 139.320 4.360 -999.990 -999.990 1.393 ..P WKT 2011 02 10 09 49 55 31.3200 -97.3300 251.000 122.0 141.580 4.260 -999.990 -999.990 1.416 ..P WKT 2011 02 10 09 54 55 31.3200 -97.3300 251.000 457.0 131.403 4.280 -999.990 -999.990 1.314 ..P WKT 2011 02 10 09 59 55 31.3200 -97.3300 251.000 30.0 144.589 3.980 -999.990 -999.990 1.446 ..P WKT 2011 02 10 10 04 55 31.3200 -97.3300 251.000 122.0 135.755 4.880 -999.990 -999.990 1.358 ..P WKT 2011 02 10 10 09 55 31.3200 -97.3300 251.000 457.0 131.797 4.040 -999.990 -999.990 1.318 ..P WKT 2011 02 10 10 19 55 31.3200 -97.3300 251.000 30.0 142.992 4.000 -999.990 -999.990 1.430 ..P WKT 2011 02 10 10 24 55 31.3200 -97.3300 251.000 122.0 142.348 4.310 -999.990 -999.990 1.423 ..P WKT 2011 02 10 10 29 55 31.3200 -97.3300 251.000 457.0 135.317 4.110 -999.990 -999.990 1.353 ..P WKT 2011 02 10 10 34 55 31.3200 -97.3300 251.000 30.0 139.714 4.170 -999.990 -999.990 1.397 ..P WKT 2011 02 10 10 39 55 31.3200 -97.3300 251.000 122.0 139.573 5.310 -999.990 -999.990 1.396 ..P WKT 2011 02 10 10 44 55 31.3200 -97.3300 251.000 457.0 125.318 3.910 -999.990 -999.990 1.253 ..P WKT 2011 02 10 10 54 55 31.3200 -97.3300 251.000 30.0 139.271 4.100 -999.990 -999.990 1.393 ..P WKT 2011 02 10 10 59 55 31.3200 -97.3300 251.000 122.0 143.954 4.060 -999.990 -999.990 1.440 ..P WKT 2011 02 10 11 04 55 31.3200 -97.3300 251.000 457.0 134.189 4.940 -999.990 -999.990 1.342 ..P WKT 2011 02 10 11 09 55 31.3200 -97.3300 251.000 30.0 143.074 5.220 -999.990 -999.990 1.431 ..P WKT 2011 02 10 11 14 55 31.3200 -97.3300 251.000 122.0 141.876 4.250 -999.990 -999.990 1.419 ..P WKT 2011 02 10 11 19 55 31.3200 -97.3300 251.000 457.0 138.328 4.280 -999.990 -999.990 1.383 ..P WKT 2011 02 10 11 29 55 31.3200 -97.3300 251.000 30.0 139.234 4.400 -999.990 -999.990 1.392 ..P WKT 2011 02 10 11 34 55 31.3200 -97.3300 251.000 122.0 141.337 4.000 -999.990 -999.990 1.413 ..P WKT 2011 02 10 11 39 55 31.3200 -97.3300 251.000 457.0 137.393 4.240 -999.990 -999.990 1.374 ..P WKT 2011 02 10 11 44 55 31.3200 -97.3300 251.000 30.0 145.208 4.410 -999.990 -999.990 1.452 ..P WKT 2011 02 10 11 49 55 31.3200 -97.3300 251.000 122.0 142.271 4.100 -999.990 -999.990 1.423 ..P WKT 2011 02 10 12 09 55 31.3200 -97.3300 251.000 457.0 137.417 4.930 -999.990 -999.990 1.374 ..P WKT 2011 02 10 12 10 25 31.3200 -97.3300 251.000 457.0 136.096 3.760 -999.990 -999.990 1.361 ..P WKT 2011 02 10 12 10 55 31.3200 -97.3300 251.000 457.0 138.472 3.580 -999.990 -999.990 1.385 ..P WKT 2011 02 10 12 11 25 31.3200 -97.3300 251.000 457.0 134.801 3.900 -999.990 -999.990 1.348 ..P WKT 2011 02 10 12 11 55 31.3200 -97.3300 251.000 457.0 133.481 3.740 -999.990 -999.990 1.335 ..P WKT 2011 02 10 12 12 25 31.3200 -97.3300 251.000 457.0 137.536 3.670 -999.990 -999.990 1.375 ..P WKT 2011 02 10 12 12 55 31.3200 -97.3300 251.000 457.0 132.857 3.520 -999.990 -999.990 1.329 ..P WKT 2011 02 10 12 13 25 31.3200 -97.3300 251.000 457.0 134.561 3.920 -999.990 -999.990 1.346 ..P WKT 2011 02 10 12 13 55 31.3200 -97.3300 251.000 457.0 135.592 3.750 -999.990 -999.990 1.356 ..P WKT 2011 02 10 12 14 25 31.3200 -97.3300 251.000 457.0 138.303 3.760 -999.990 -999.990 1.383 ..P WKT 2011 02 10 12 14 55 31.3200 -97.3300 251.000 457.0 137.319 3.930 -999.990 -999.990 1.373 ..P WKT 2011 02 10 12 19 55 31.3200 -97.3300 251.000 30.0 146.291 3.570 -999.990 -999.990 1.463 ..P WKT 2011 02 10 12 24 55 31.3200 -97.3300 251.000 122.0 145.186 4.170 -999.990 -999.990 1.452 ..P WKT 2011 02 10 12 29 55 31.3200 -97.3300 251.000 457.0 131.317 4.460 -999.990 -999.990 1.313 ..P WKT 2011 02 10 12 34 55 31.3200 -97.3300 251.000 30.0 137.602 4.050 -999.990 -999.990 1.376 ..P WKT 2011 02 10 12 39 55 31.3200 -97.3300 251.000 122.0 151.275 4.040 -999.990 -999.990 1.513 ..P WKT 2011 02 10 12 44 55 31.3200 -97.3300 251.000 457.0 128.337 3.770 -999.990 -999.990 1.283 ..P WKT 2011 02 10 12 54 55 31.3200 -97.3300 251.000 30.0 146.200 3.950 -999.990 -999.990 1.462 ..P WKT 2011 02 10 12 59 55 31.3200 -97.3300 251.000 122.0 147.534 3.990 -999.990 -999.990 1.475 ..P WKT 2011 02 10 13 04 55 31.3200 -97.3300 251.000 457.0 134.594 5.030 -999.990 -999.990 1.346 ..P WKT 2011 02 10 13 09 55 31.3200 -97.3300 251.000 30.0 145.835 3.930 -999.990 -999.990 1.458 ..P WKT 2011 02 10 13 14 55 31.3200 -97.3300 251.000 122.0 140.620 4.180 -999.990 -999.990 1.406 ..P WKT 2011 02 10 13 19 55 31.3200 -97.3300 251.000 457.0 122.139 5.030 -999.990 -999.990 1.221 ..P WKT 2011 02 10 13 29 55 31.3200 -97.3300 251.000 30.0 136.729 3.850 -999.990 -999.990 1.367 ..P WKT 2011 02 10 13 34 55 31.3200 -97.3300 251.000 122.0 136.720 4.170 -999.990 -999.990 1.367 ..P WKT 2011 02 10 13 39 55 31.3200 -97.3300 251.000 457.0 122.606 3.730 -999.990 -999.990 1.226 ..P WKT 2011 02 10 13 44 55 31.3200 -97.3300 251.000 30.0 134.182 5.130 -999.990 -999.990 1.342 ..P WKT 2011 02 10 13 49 55 31.3200 -97.3300 251.000 122.0 136.692 4.580 -999.990 -999.990 1.367 ..P WKT 2011 02 10 13 54 55 31.3200 -97.3300 251.000 457.0 124.090 3.890 -999.990 -999.990 1.241 ..P WKT 2011 02 10 14 04 55 31.3200 -97.3300 251.000 30.0 138.798 4.380 -999.990 -999.990 1.388 ..P WKT 2011 02 10 14 09 55 31.3200 -97.3300 251.000 122.0 143.274 3.750 -999.990 -999.990 1.433 ..P WKT 2011 02 10 14 14 55 31.3200 -97.3300 251.000 457.0 120.216 4.770 -999.990 -999.990 1.202 ..P WKT 2011 02 10 14 19 55 31.3200 -97.3300 251.000 30.0 140.809 4.790 -999.990 -999.990 1.408 ..P WKT 2011 02 10 14 24 55 31.3200 -97.3300 251.000 122.0 145.620 6.400 -999.990 -999.990 1.456 ..P WKT 2011 02 10 14 29 55 31.3200 -97.3300 251.000 457.0 128.942 3.550 -999.990 -999.990 1.289 ..P WKT 2011 02 10 14 39 55 31.3200 -97.3300 251.000 30.0 147.389 3.680 -999.990 -999.990 1.474 ..P WKT 2011 02 10 14 44 55 31.3200 -97.3300 251.000 122.0 140.713 4.230 -999.990 -999.990 1.407 ..P WKT 2011 02 10 14 49 55 31.3200 -97.3300 251.000 457.0 127.993 5.180 -999.990 -999.990 1.280 ..P WKT 2011 02 10 14 54 55 31.3200 -97.3300 251.000 30.0 144.483 5.220 -999.990 -999.990 1.445 ..P WKT 2011 02 10 14 59 55 31.3200 -97.3300 251.000 122.0 140.996 4.920 -999.990 -999.990 1.410 ..P WKT 2011 02 10 15 04 55 31.3200 -97.3300 251.000 457.0 130.124 4.500 -999.990 -999.990 1.301 ..P WKT 2011 02 10 15 14 55 31.3200 -97.3300 251.000 30.0 142.718 3.540 -999.990 -999.990 1.427 ..P WKT 2011 02 10 15 19 55 31.3200 -97.3300 251.000 122.0 142.013 4.430 -999.990 -999.990 1.420 ..P WKT 2011 02 10 15 24 55 31.3200 -97.3300 251.000 457.0 131.237 5.060 -999.990 -999.990 1.312 ..P WKT 2011 02 10 15 29 55 31.3200 -97.3300 251.000 30.0 145.302 4.470 -999.990 -999.990 1.453 ..P WKT 2011 02 10 15 34 55 31.3200 -97.3300 251.000 122.0 142.919 3.830 -999.990 -999.990 1.429 ..P WKT 2011 02 10 15 39 55 31.3200 -97.3300 251.000 457.0 130.129 4.320 -999.990 -999.990 1.301 ..P WKT 2011 02 10 15 49 55 31.3200 -97.3300 251.000 30.0 143.538 3.470 -999.990 -999.990 1.435 ..P WKT 2011 02 10 15 54 55 31.3200 -97.3300 251.000 122.0 141.538 3.370 -999.990 -999.990 1.415 ..P WKT 2011 02 10 15 59 55 31.3200 -97.3300 251.000 457.0 130.140 3.630 -999.990 -999.990 1.301 ..P WKT 2011 02 10 16 04 55 31.3200 -97.3300 251.000 30.0 138.882 4.150 -999.990 -999.990 1.389 ..P WKT 2011 02 10 16 09 55 31.3200 -97.3300 251.000 122.0 145.274 3.090 -999.990 -999.990 1.453 ..P WKT 2011 02 10 16 14 55 31.3200 -97.3300 251.000 457.0 130.856 3.170 -999.990 -999.990 1.309 ..P WKT 2011 02 10 16 24 55 31.3200 -97.3300 251.000 30.0 141.290 3.230 -999.990 -999.990 1.413 ..P WKT 2011 02 10 16 29 55 31.3200 -97.3300 251.000 122.0 142.311 5.050 -999.990 -999.990 1.423 ..P WKT 2011 02 10 16 34 55 31.3200 -97.3300 251.000 457.0 133.264 3.710 -999.990 -999.990 1.333 ..P WKT 2011 02 10 16 39 55 31.3200 -97.3300 251.000 30.0 141.669 4.440 -999.990 -999.990 1.417 ..P WKT 2011 02 10 16 44 55 31.3200 -97.3300 251.000 122.0 140.005 4.930 -999.990 -999.990 1.400 ..P WKT 2011 02 10 16 49 55 31.3200 -97.3300 251.000 457.0 136.328 4.720 -999.990 -999.990 1.363 ..P WKT 2011 02 10 17 04 55 31.3200 -97.3300 251.000 30.0 138.805 4.680 -999.990 -999.990 1.388 ..P WKT 2011 02 10 17 09 55 31.3200 -97.3300 251.000 122.0 140.706 4.890 -999.990 -999.990 1.407 ..P WKT 2011 02 10 17 14 55 31.3200 -97.3300 251.000 457.0 141.434 4.590 -999.990 -999.990 1.414 ..P WKT 2011 02 10 17 19 55 31.3200 -97.3300 251.000 30.0 140.819 5.320 -999.990 -999.990 1.408 ..P WKT 2011 02 10 17 24 55 31.3200 -97.3300 251.000 122.0 145.238 4.300 -999.990 -999.990 1.452 ..P WKT 2011 02 10 17 29 55 31.3200 -97.3300 251.000 457.0 140.428 4.290 -999.990 -999.990 1.404 ..P WKT 2011 02 10 17 39 55 31.3200 -97.3300 251.000 30.0 140.236 4.030 -999.990 -999.990 1.402 ..P WKT 2011 02 10 17 44 55 31.3200 -97.3300 251.000 122.0 144.013 3.330 -999.990 -999.990 1.440 ..P WKT 2011 02 10 17 49 55 31.3200 -97.3300 251.000 457.0 146.616 4.710 -999.990 -999.990 1.466 ..P WKT 2011 02 10 17 54 55 31.3200 -97.3300 251.000 30.0 145.361 3.220 -999.990 -999.990 1.454 ..P WKT 2011 02 10 17 59 55 31.3200 -97.3300 251.000 122.0 139.911 3.740 -999.990 -999.990 1.399 ..P WKT 2011 02 10 18 04 55 31.3200 -97.3300 251.000 457.0 142.178 2.970 -999.990 -999.990 1.422 ..P WKT 2011 02 10 18 14 55 31.3200 -97.3300 251.000 30.0 140.482 2.820 -999.990 -999.990 1.405 ..P WKT 2011 02 10 18 19 55 31.3200 -97.3300 251.000 122.0 145.241 2.940 -999.990 -999.990 1.452 ..P WKT 2011 02 10 18 24 55 31.3200 -97.3300 251.000 457.0 138.426 3.650 -999.990 -999.990 1.384 ..P WKT 2011 02 10 18 29 55 31.3200 -97.3300 251.000 30.0 138.488 3.880 -999.990 -999.990 1.385 ..P WKT 2011 02 10 18 34 55 31.3200 -97.3300 251.000 122.0 138.551 3.850 -999.990 -999.990 1.386 ..P WKT 2011 02 10 18 39 55 31.3200 -97.3300 251.000 457.0 136.097 3.710 -999.990 -999.990 1.361 ..P WKT 2011 02 10 18 49 55 31.3200 -97.3300 251.000 30.0 137.181 4.730 -999.990 -999.990 1.372 ..P WKT 2011 02 10 18 54 55 31.3200 -97.3300 251.000 122.0 142.060 4.340 -999.990 -999.990 1.421 ..P WKT 2011 02 10 18 59 55 31.3200 -97.3300 251.000 457.0 140.732 3.730 -999.990 -999.990 1.407 ..P WKT 2011 02 10 19 04 55 31.3200 -97.3300 251.000 30.0 137.392 4.270 -999.990 -999.990 1.374 ..P WKT 2011 02 10 19 09 55 31.3200 -97.3300 251.000 122.0 136.735 4.660 -999.990 -999.990 1.367 ..P WKT 2011 02 10 19 14 55 31.3200 -97.3300 251.000 457.0 138.763 3.290 -999.990 -999.990 1.388 ..P WKT 2011 02 10 19 24 55 31.3200 -97.3300 251.000 30.0 142.624 5.080 -999.990 -999.990 1.426 ..P WKT 2011 02 10 19 29 55 31.3200 -97.3300 251.000 122.0 134.063 3.410 -999.990 -999.990 1.341 ..P WKT 2011 02 10 19 34 55 31.3200 -97.3300 251.000 457.0 136.569 3.020 -999.990 -999.990 1.366 ..P WKT 2011 02 10 19 39 55 31.3200 -97.3300 251.000 30.0 146.117 3.040 -999.990 -999.990 1.461 ..P WKT 2011 02 10 19 44 55 31.3200 -97.3300 251.000 122.0 144.599 3.090 -999.990 -999.990 1.446 ..P WKT 2011 02 10 19 49 55 31.3200 -97.3300 251.000 457.0 144.757 3.030 -999.990 -999.990 1.448 ..P WKT 2011 02 10 19 59 55 31.3200 -97.3300 251.000 30.0 146.079 3.690 -999.990 -999.990 1.461 ..P WKT 2011 02 10 20 04 55 31.3200 -97.3300 251.000 122.0 146.908 4.290 -999.990 -999.990 1.469 ..P WKT 2011 02 10 20 09 55 31.3200 -97.3300 251.000 457.0 148.408 2.990 -999.990 -999.990 1.484 ..P WKT 2011 02 10 20 14 55 31.3200 -97.3300 251.000 30.0 142.529 2.840 -999.990 -999.990 1.425 ..P WKT 2011 02 10 20 19 55 31.3200 -97.3300 251.000 122.0 138.664 3.010 -999.990 -999.990 1.387 ..P WKT 2011 02 10 20 24 55 31.3200 -97.3300 251.000 457.0 141.504 2.950 -999.990 -999.990 1.415 ..P WKT 2011 02 10 20 34 55 31.3200 -97.3300 251.000 30.0 144.863 3.190 -999.990 -999.990 1.449 ..P WKT 2011 02 10 20 39 55 31.3200 -97.3300 251.000 122.0 146.050 2.980 -999.990 -999.990 1.461 ..P WKT 2011 02 10 20 44 55 31.3200 -97.3300 251.000 457.0 141.874 3.190 -999.990 -999.990 1.419 ..P WKT 2011 02 10 20 49 55 31.3200 -97.3300 251.000 30.0 142.055 3.430 -999.990 -999.990 1.421 ..P WKT 2011 02 10 20 54 55 31.3200 -97.3300 251.000 122.0 145.758 2.770 -999.990 -999.990 1.458 ..P WKT 2011 02 10 20 59 55 31.3200 -97.3300 251.000 457.0 147.113 3.380 -999.990 -999.990 1.471 ..P WKT 2011 02 10 21 09 55 31.3200 -97.3300 251.000 30.0 140.533 4.560 -999.990 -999.990 1.405 ..P WKT 2011 02 10 21 14 55 31.3200 -97.3300 251.000 122.0 142.488 4.880 -999.990 -999.990 1.425 ..P WKT 2011 02 10 21 19 55 31.3200 -97.3300 251.000 457.0 136.395 3.350 -999.990 -999.990 1.364 ..P WKT 2011 02 10 21 24 55 31.3200 -97.3300 251.000 30.0 140.026 4.140 -999.990 -999.990 1.400 ..P WKT 2011 02 10 21 29 55 31.3200 -97.3300 251.000 122.0 149.523 3.410 -999.990 -999.990 1.495 ..P WKT 2011 02 10 21 34 55 31.3200 -97.3300 251.000 457.0 142.258 3.280 -999.990 -999.990 1.423 ..P WKT 2011 02 10 21 44 55 31.3200 -97.3300 251.000 30.0 142.047 3.160 -999.990 -999.990 1.420 ..P WKT 2011 02 10 21 49 55 31.3200 -97.3300 251.000 122.0 146.587 3.240 -999.990 -999.990 1.466 ..P WKT 2011 02 10 21 54 55 31.3200 -97.3300 251.000 457.0 144.926 3.410 -999.990 -999.990 1.449 ..P WKT 2011 02 10 21 59 55 31.3200 -97.3300 251.000 30.0 145.778 2.950 -999.990 -999.990 1.458 ..P WKT 2011 02 10 22 04 55 31.3200 -97.3300 251.000 122.0 144.284 3.570 -999.990 -999.990 1.443 ..P WKT 2011 02 10 22 09 55 31.3200 -97.3300 251.000 457.0 144.801 2.950 -999.990 -999.990 1.448 ..P WKT 2011 02 10 22 19 55 31.3200 -97.3300 251.000 30.0 140.306 4.120 -999.990 -999.990 1.403 ..P WKT 2011 02 10 22 24 55 31.3200 -97.3300 251.000 122.0 143.839 3.870 -999.990 -999.990 1.438 ..P WKT 2011 02 10 22 29 55 31.3200 -97.3300 251.000 457.0 143.351 2.980 -999.990 -999.990 1.434 ..P WKT 2011 02 10 22 34 55 31.3200 -97.3300 251.000 30.0 141.689 2.920 -999.990 -999.990 1.417 ..P WKT 2011 02 10 22 39 55 31.3200 -97.3300 251.000 122.0 146.898 3.040 -999.990 -999.990 1.469 ..P WKT 2011 02 10 22 44 55 31.3200 -97.3300 251.000 457.0 143.562 2.560 -999.990 -999.990 1.436 ..P WKT 2011 02 10 22 54 55 31.3200 -97.3300 251.000 30.0 141.747 3.520 -999.990 -999.990 1.417 ..P WKT 2011 02 10 22 59 55 31.3200 -97.3300 251.000 122.0 143.102 3.130 -999.990 -999.990 1.431 ..P WKT 2011 02 10 23 04 55 31.3200 -97.3300 251.000 457.0 145.797 2.420 -999.990 -999.990 1.458 ..P WKT 2011 02 10 23 09 55 31.3200 -97.3300 251.000 30.0 143.131 4.200 -999.990 -999.990 1.431 ..P WKT 2011 02 10 23 14 55 31.3200 -97.3300 251.000 122.0 143.816 2.830 -999.990 -999.990 1.438 ..P WKT 2011 02 10 23 19 55 31.3200 -97.3300 251.000 457.0 145.841 2.200 -999.990 -999.990 1.458 ..P WKT 2011 02 10 23 29 55 31.3200 -97.3300 251.000 30.0 145.324 2.330 -999.990 -999.990 1.453 ..P WKT 2011 02 10 23 34 55 31.3200 -97.3300 251.000 122.0 143.454 2.910 -999.990 -999.990 1.435 ..P WKT 2011 02 10 23 39 55 31.3200 -97.3300 251.000 457.0 146.945 3.090 -999.990 -999.990 1.469 ..P WKT 2011 02 10 23 44 55 31.3200 -97.3300 251.000 30.0 146.749 2.890 -999.990 -999.990 1.467 ..P WKT 2011 02 10 23 49 55 31.3200 -97.3300 251.000 122.0 143.874 4.150 -999.990 -999.990 1.439 ..P WKT 2011 02 11 00 09 55 31.3200 -97.3300 251.000 457.0 147.383 2.610 -999.990 -999.990 1.474 ..P WKT 2011 02 11 00 10 25 31.3200 -97.3300 251.000 457.0 143.241 2.620 -999.990 -999.990 1.432 ..P WKT 2011 02 11 00 10 55 31.3200 -97.3300 251.000 457.0 148.146 2.680 -999.990 -999.990 1.481 ..P WKT 2011 02 11 00 11 25 31.3200 -97.3300 251.000 457.0 148.361 2.840 -999.990 -999.990 1.484 ..P WKT 2011 02 11 00 11 55 31.3200 -97.3300 251.000 457.0 144.554 2.690 -999.990 -999.990 1.446 ..P WKT 2011 02 11 00 12 25 31.3200 -97.3300 251.000 457.0 144.434 2.600 -999.990 -999.990 1.444 ..P WKT 2011 02 11 00 12 55 31.3200 -97.3300 251.000 457.0 146.323 3.120 -999.990 -999.990 1.463 ..P WKT 2011 02 11 00 13 25 31.3200 -97.3300 251.000 457.0 145.197 4.000 -999.990 -999.990 1.452 ..P WKT 2011 02 11 00 13 55 31.3200 -97.3300 251.000 457.0 142.396 2.870 -999.990 -999.990 1.424 ..P WKT 2011 02 11 00 14 25 31.3200 -97.3300 251.000 457.0 148.642 3.740 -999.990 -999.990 1.486 ..P WKT 2011 02 11 00 14 55 31.3200 -97.3300 251.000 457.0 143.495 4.180 -999.990 -999.990 1.435 ..P WKT 2011 02 11 00 19 55 31.3200 -97.3300 251.000 30.0 140.612 3.750 -999.990 -999.990 1.406 ..P WKT 2011 02 11 00 24 55 31.3200 -97.3300 251.000 122.0 140.744 5.860 -999.990 -999.990 1.407 ..P WKT 2011 02 11 00 29 55 31.3200 -97.3300 251.000 457.0 143.222 7.090 -999.990 -999.990 1.432 ..P WKT 2011 02 11 00 34 55 31.3200 -97.3300 251.000 30.0 139.669 6.550 -999.990 -999.990 1.397 ..P WKT 2011 02 11 00 39 55 31.3200 -97.3300 251.000 122.0 142.817 5.200 -999.990 -999.990 1.428 ..P WKT 2011 02 11 00 44 55 31.3200 -97.3300 251.000 457.0 155.181 5.610 -999.990 -999.990 1.552 ..P WKT 2011 02 11 00 54 55 31.3200 -97.3300 251.000 30.0 157.427 5.910 -999.990 -999.990 1.574 ..P WKT 2011 02 11 00 59 55 31.3200 -97.3300 251.000 122.0 154.851 5.970 -999.990 -999.990 1.549 ..P WKT 2011 02 11 01 04 55 31.3200 -97.3300 251.000 457.0 156.797 7.030 -999.990 -999.990 1.568 ..P WKT 2011 02 11 01 09 55 31.3200 -97.3300 251.000 30.0 157.235 5.390 -999.990 -999.990 1.572 ..P WKT 2011 02 11 01 14 55 31.3200 -97.3300 251.000 122.0 153.150 4.660 -999.990 -999.990 1.532 ..P WKT 2011 02 11 01 19 55 31.3200 -97.3300 251.000 457.0 145.713 4.400 -999.990 -999.990 1.457 ..P WKT 2011 02 11 01 29 55 31.3200 -97.3300 251.000 30.0 158.391 3.270 -999.990 -999.990 1.584 ..P WKT 2011 02 11 01 34 55 31.3200 -97.3300 251.000 122.0 161.248 5.680 -999.990 -999.990 1.612 ..P WKT 2011 02 11 01 39 55 31.3200 -97.3300 251.000 457.0 147.347 5.700 -999.990 -999.990 1.473 ..P WKT 2011 02 11 01 44 55 31.3200 -97.3300 251.000 30.0 163.778 4.640 -999.990 -999.990 1.638 ..P WKT 2011 02 11 01 49 55 31.3200 -97.3300 251.000 122.0 157.249 2.630 -999.990 -999.990 1.572 ..P WKT 2011 02 11 01 54 55 31.3200 -97.3300 251.000 457.0 143.682 3.230 -999.990 -999.990 1.437 ..P WKT 2011 02 11 02 04 55 31.3200 -97.3300 251.000 30.0 156.650 3.050 -999.990 -999.990 1.567 ..P WKT 2011 02 11 02 09 55 31.3200 -97.3300 251.000 122.0 148.159 3.900 -999.990 -999.990 1.482 ..P WKT 2011 02 11 02 14 55 31.3200 -97.3300 251.000 457.0 146.873 4.170 -999.990 -999.990 1.469 ..P WKT 2011 02 11 02 19 55 31.3200 -97.3300 251.000 30.0 159.834 4.930 -999.990 -999.990 1.598 ..P WKT 2011 02 11 02 24 55 31.3200 -97.3300 251.000 122.0 155.532 4.650 -999.990 -999.990 1.555 ..P WKT 2011 02 11 02 29 55 31.3200 -97.3300 251.000 457.0 144.861 5.670 -999.990 -999.990 1.449 ..P WKT 2011 02 11 02 39 55 31.3200 -97.3300 251.000 30.0 157.710 5.150 -999.990 -999.990 1.577 ..P WKT 2011 02 11 02 44 55 31.3200 -97.3300 251.000 122.0 164.806 4.910 -999.990 -999.990 1.648 ..P WKT 2011 02 11 02 49 55 31.3200 -97.3300 251.000 457.0 142.400 4.420 -999.990 -999.990 1.424 ..P WKT 2011 02 11 02 54 55 31.3200 -97.3300 251.000 30.0 165.587 4.520 -999.990 -999.990 1.656 ..P WKT 2011 02 11 02 59 55 31.3200 -97.3300 251.000 122.0 156.256 5.850 -999.990 -999.990 1.563 ..P WKT 2011 02 11 03 04 55 31.3200 -97.3300 251.000 457.0 140.890 3.690 -999.990 -999.990 1.409 ..P WKT 2011 02 11 03 14 55 31.3200 -97.3300 251.000 30.0 159.656 3.760 -999.990 -999.990 1.597 ..P WKT 2011 02 11 03 19 55 31.3200 -97.3300 251.000 122.0 160.932 4.910 -999.990 -999.990 1.609 ..P WKT 2011 02 11 03 24 55 31.3200 -97.3300 251.000 457.0 128.682 4.150 -999.990 -999.990 1.287 ..P WKT 2011 02 11 03 29 55 31.3200 -97.3300 251.000 30.0 166.840 4.750 -999.990 -999.990 1.668 ..P WKT 2011 02 11 03 34 55 31.3200 -97.3300 251.000 122.0 157.723 4.020 -999.990 -999.990 1.577 ..P WKT 2011 02 11 03 39 55 31.3200 -97.3300 251.000 457.0 133.183 3.600 -999.990 -999.990 1.332 ..P WKT 2011 02 11 03 49 55 31.3200 -97.3300 251.000 30.0 159.160 3.840 -999.990 -999.990 1.592 ..P WKT 2011 02 11 03 54 55 31.3200 -97.3300 251.000 122.0 161.395 4.220 -999.990 -999.990 1.614 ..P WKT 2011 02 11 03 59 55 31.3200 -97.3300 251.000 457.0 142.170 5.250 -999.990 -999.990 1.422 ..P WKT 2011 02 11 04 04 55 31.3200 -97.3300 251.000 30.0 167.878 4.620 -999.990 -999.990 1.679 ..P WKT 2011 02 11 04 09 55 31.3200 -97.3300 251.000 122.0 169.442 4.140 -999.990 -999.990 1.694 ..P WKT 2011 02 11 04 14 55 31.3200 -97.3300 251.000 457.0 137.474 3.120 -999.990 -999.990 1.375 ..P WKT 2011 02 11 04 24 55 31.3200 -97.3300 251.000 30.0 214.786 4.450 -999.990 -999.990 2.148 ..P WKT 2011 02 11 04 29 55 31.3200 -97.3300 251.000 122.0 172.157 4.290 -999.990 -999.990 1.722 ..P WKT 2011 02 11 04 34 55 31.3200 -97.3300 251.000 457.0 141.097 4.650 -999.990 -999.990 1.411 ..P WKT 2011 02 11 04 39 55 31.3200 -97.3300 251.000 30.0 163.861 4.450 -999.990 -999.990 1.639 ..P WKT 2011 02 11 04 44 55 31.3200 -97.3300 251.000 122.0 165.497 3.660 -999.990 -999.990 1.655 ..P WKT 2011 02 11 04 49 55 31.3200 -97.3300 251.000 457.0 137.454 3.770 -999.990 -999.990 1.375 ..P WKT 2011 02 11 05 04 55 31.3200 -97.3300 251.000 30.0 165.385 4.620 -999.990 -999.990 1.654 ..P WKT 2011 02 11 05 09 55 31.3200 -97.3300 251.000 122.0 158.828 3.750 -999.990 -999.990 1.588 ..P WKT 2011 02 11 05 14 55 31.3200 -97.3300 251.000 457.0 129.969 3.970 -999.990 -999.990 1.300 ..P WKT 2011 02 11 05 19 55 31.3200 -97.3300 251.000 30.0 161.815 4.140 -999.990 -999.990 1.618 ..P WKT 2011 02 11 05 24 55 31.3200 -97.3300 251.000 122.0 163.979 3.160 -999.990 -999.990 1.640 ..P WKT 2011 02 11 05 29 55 31.3200 -97.3300 251.000 457.0 136.795 3.270 -999.990 -999.990 1.368 ..P WKT 2011 02 11 05 39 55 31.3200 -97.3300 251.000 30.0 165.152 3.120 -999.990 -999.990 1.652 ..P WKT 2011 02 11 05 44 55 31.3200 -97.3300 251.000 122.0 161.830 3.190 -999.990 -999.990 1.618 ..P WKT 2011 02 11 05 49 55 31.3200 -97.3300 251.000 457.0 137.040 4.280 -999.990 -999.990 1.370 ..P WKT 2011 02 11 05 54 55 31.3200 -97.3300 251.000 30.0 166.422 3.710 -999.990 -999.990 1.664 ..P WKT 2011 02 11 05 59 55 31.3200 -97.3300 251.000 122.0 164.106 4.000 -999.990 -999.990 1.641 ..P WKT 2011 02 11 06 04 55 31.3200 -97.3300 251.000 457.0 139.818 2.980 -999.990 -999.990 1.398 ..P WKT 2011 02 11 06 14 55 31.3200 -97.3300 251.000 30.0 164.921 3.540 -999.990 -999.990 1.649 ..P WKT 2011 02 11 06 19 55 31.3200 -97.3300 251.000 122.0 163.490 3.190 -999.990 -999.990 1.635 ..P WKT 2011 02 11 06 24 55 31.3200 -97.3300 251.000 457.0 135.223 4.660 -999.990 -999.990 1.352 ..P WKT 2011 02 11 06 29 55 31.3200 -97.3300 251.000 30.0 167.004 3.700 -999.990 -999.990 1.670 ..P WKT 2011 02 11 06 34 55 31.3200 -97.3300 251.000 122.0 162.052 3.360 -999.990 -999.990 1.621 ..P WKT 2011 02 11 06 39 55 31.3200 -97.3300 251.000 457.0 140.493 3.080 -999.990 -999.990 1.405 ..P WKT 2011 02 11 06 49 55 31.3200 -97.3300 251.000 30.0 163.321 3.260 -999.990 -999.990 1.633 ..P WKT 2011 02 11 06 54 55 31.3200 -97.3300 251.000 122.0 171.644 3.400 -999.990 -999.990 1.716 ..P WKT 2011 02 11 06 59 55 31.3200 -97.3300 251.000 457.0 136.688 3.540 -999.990 -999.990 1.367 ..P WKT 2011 02 11 07 04 55 31.3200 -97.3300 251.000 30.0 153.735 3.850 -999.990 -999.990 1.537 ..P WKT 2011 02 11 07 09 55 31.3200 -97.3300 251.000 122.0 162.730 3.450 -999.990 -999.990 1.627 ..P WKT 2011 02 11 07 14 55 31.3200 -97.3300 251.000 457.0 138.508 3.240 -999.990 -999.990 1.385 ..P WKT 2011 02 11 07 24 55 31.3200 -97.3300 251.000 30.0 153.813 3.290 -999.990 -999.990 1.538 ..P WKT 2011 02 11 07 29 55 31.3200 -97.3300 251.000 122.0 161.467 3.280 -999.990 -999.990 1.615 ..P WKT 2011 02 11 07 34 55 31.3200 -97.3300 251.000 457.0 134.224 3.730 -999.990 -999.990 1.342 ..P WKT 2011 02 11 07 39 55 31.3200 -97.3300 251.000 30.0 155.970 3.370 -999.990 -999.990 1.560 ..P WKT 2011 02 11 07 44 55 31.3200 -97.3300 251.000 122.0 161.946 3.760 -999.990 -999.990 1.619 ..P WKT 2011 02 11 07 49 55 31.3200 -97.3300 251.000 457.0 138.058 4.680 -999.990 -999.990 1.381 ..P WKT 2011 02 11 07 59 55 31.3200 -97.3300 251.000 30.0 158.158 3.410 -999.990 -999.990 1.582 ..P WKT 2011 02 11 08 04 55 31.3200 -97.3300 251.000 122.0 156.512 3.370 -999.990 -999.990 1.565 ..P WKT 2011 02 11 08 09 55 31.3200 -97.3300 251.000 457.0 139.429 3.660 -999.990 -999.990 1.394 ..P WKT 2011 02 11 08 14 55 31.3200 -97.3300 251.000 30.0 153.220 3.870 -999.990 -999.990 1.532 ..P WKT 2011 02 11 08 19 55 31.3200 -97.3300 251.000 122.0 158.284 3.700 -999.990 -999.990 1.583 ..P WKT 2011 02 11 08 24 55 31.3200 -97.3300 251.000 457.0 129.120 4.080 -999.990 -999.990 1.291 ..P WKT 2011 02 11 08 34 55 31.3200 -97.3300 251.000 30.0 153.873 4.190 -999.990 -999.990 1.539 ..P WKT 2011 02 11 08 39 55 31.3200 -97.3300 251.000 122.0 153.593 3.970 -999.990 -999.990 1.536 ..P WKT 2011 02 11 08 44 55 31.3200 -97.3300 251.000 457.0 130.156 4.920 -999.990 -999.990 1.302 ..P WKT 2011 02 11 08 49 55 31.3200 -97.3300 251.000 30.0 149.341 4.780 -999.990 -999.990 1.493 ..P WKT 2011 02 11 08 54 55 31.3200 -97.3300 251.000 122.0 153.256 5.720 -999.990 -999.990 1.533 ..P WKT 2011 02 11 08 59 55 31.3200 -97.3300 251.000 457.0 127.470 3.760 -999.990 -999.990 1.275 ..P WKT 2011 02 11 09 09 55 31.3200 -97.3300 251.000 30.0 146.615 3.670 -999.990 -999.990 1.466 ..P WKT 2011 02 11 09 14 55 31.3200 -97.3300 251.000 122.0 147.246 4.210 -999.990 -999.990 1.472 ..P WKT 2011 02 11 09 19 55 31.3200 -97.3300 251.000 457.0 135.123 5.110 -999.990 -999.990 1.351 ..P WKT 2011 02 11 09 24 55 31.3200 -97.3300 251.000 30.0 144.648 5.770 -999.990 -999.990 1.446 ..P WKT 2011 02 11 09 29 55 31.3200 -97.3300 251.000 122.0 154.174 5.230 -999.990 -999.990 1.542 ..P WKT 2011 02 11 09 34 55 31.3200 -97.3300 251.000 457.0 134.498 4.120 -999.990 -999.990 1.345 ..P WKT 2011 02 11 09 44 55 31.3200 -97.3300 251.000 30.0 151.871 4.170 -999.990 -999.990 1.519 ..P WKT 2011 02 11 09 49 55 31.3200 -97.3300 251.000 122.0 153.173 5.360 -999.990 -999.990 1.532 ..P WKT 2011 02 11 09 54 55 31.3200 -97.3300 251.000 457.0 140.378 5.930 -999.990 -999.990 1.404 ..P WKT 2011 02 11 09 59 55 31.3200 -97.3300 251.000 30.0 152.253 4.980 -999.990 -999.990 1.523 ..P WKT 2011 02 11 10 04 55 31.3200 -97.3300 251.000 122.0 157.417 5.870 -999.990 -999.990 1.574 ..P WKT 2011 02 11 10 09 55 31.3200 -97.3300 251.000 457.0 123.808 4.110 -999.990 -999.990 1.238 ..P WKT 2011 02 11 10 19 55 31.3200 -97.3300 251.000 30.0 159.718 4.310 -999.990 -999.990 1.597 ..P WKT 2011 02 11 10 24 55 31.3200 -97.3300 251.000 122.0 143.804 4.380 -999.990 -999.990 1.438 ..P WKT 2011 02 11 10 29 55 31.3200 -97.3300 251.000 457.0 129.567 4.240 -999.990 -999.990 1.296 ..P WKT 2011 02 11 10 34 55 31.3200 -97.3300 251.000 30.0 166.863 5.780 -999.990 -999.990 1.669 ..P WKT 2011 02 11 10 39 55 31.3200 -97.3300 251.000 122.0 149.101 4.860 -999.990 -999.990 1.491 ..P WKT 2011 02 11 10 44 55 31.3200 -97.3300 251.000 457.0 130.669 5.240 -999.990 -999.990 1.307 ..P WKT 2011 02 11 10 54 55 31.3200 -97.3300 251.000 30.0 162.769 4.820 -999.990 -999.990 1.628 ..P WKT 2011 02 11 10 59 55 31.3200 -97.3300 251.000 122.0 146.159 4.360 -999.990 -999.990 1.462 ..P WKT 2011 02 11 11 04 55 31.3200 -97.3300 251.000 457.0 133.576 4.160 -999.990 -999.990 1.336 ..P WKT 2011 02 11 11 09 55 31.3200 -97.3300 251.000 30.0 177.062 4.580 -999.990 -999.990 1.771 ..P WKT 2011 02 11 11 14 55 31.3200 -97.3300 251.000 122.0 148.700 4.170 -999.990 -999.990 1.487 ..P WKT 2011 02 11 11 19 55 31.3200 -97.3300 251.000 457.0 135.781 4.980 -999.990 -999.990 1.358 ..P WKT 2011 02 11 11 29 55 31.3200 -97.3300 251.000 30.0 195.494 4.030 -999.990 -999.990 1.955 ..P WKT 2011 02 11 11 34 55 31.3200 -97.3300 251.000 122.0 149.270 4.280 -999.990 -999.990 1.493 ..P WKT 2011 02 11 11 39 55 31.3200 -97.3300 251.000 457.0 133.934 4.740 -999.990 -999.990 1.339 ..P WKT 2011 02 11 11 44 55 31.3200 -97.3300 251.000 30.0 172.657 4.570 -999.990 -999.990 1.727 ..P WKT 2011 02 11 11 49 55 31.3200 -97.3300 251.000 122.0 145.570 4.030 -999.990 -999.990 1.456 ..P WKT 2011 02 11 12 09 55 31.3200 -97.3300 251.000 457.0 129.952 4.610 -999.990 -999.990 1.300 ..P WKT 2011 02 11 12 10 25 31.3200 -97.3300 251.000 457.0 124.258 4.420 -999.990 -999.990 1.243 ..P WKT 2011 02 11 12 10 55 31.3200 -97.3300 251.000 457.0 123.599 4.590 -999.990 -999.990 1.236 ..P WKT 2011 02 11 12 11 25 31.3200 -97.3300 251.000 457.0 126.633 4.450 -999.990 -999.990 1.266 ..P WKT 2011 02 11 12 11 55 31.3200 -97.3300 251.000 457.0 127.654 6.330 -999.990 -999.990 1.277 ..P WKT 2011 02 11 12 12 25 31.3200 -97.3300 251.000 457.0 132.367 5.010 -999.990 -999.990 1.324 ..P WKT 2011 02 11 12 12 55 31.3200 -97.3300 251.000 457.0 131.373 4.190 -999.990 -999.990 1.314 ..P WKT 2011 02 11 12 13 25 31.3200 -97.3300 251.000 457.0 131.050 4.740 -999.990 -999.990 1.311 ..P WKT 2011 02 11 12 13 55 31.3200 -97.3300 251.000 457.0 125.021 4.110 -999.990 -999.990 1.250 ..P WKT 2011 02 11 12 14 25 31.3200 -97.3300 251.000 457.0 125.705 4.790 -999.990 -999.990 1.257 ..P WKT 2011 02 11 12 14 55 31.3200 -97.3300 251.000 457.0 123.034 4.570 -999.990 -999.990 1.230 ..P WKT 2011 02 11 12 19 55 31.3200 -97.3300 251.000 30.0 155.721 4.690 -999.990 -999.990 1.557 ..P WKT 2011 02 11 12 24 55 31.3200 -97.3300 251.000 122.0 145.781 4.770 -999.990 -999.990 1.458 ..P WKT 2011 02 11 12 29 55 31.3200 -97.3300 251.000 457.0 126.615 4.000 -999.990 -999.990 1.266 ..P WKT 2011 02 11 12 34 55 31.3200 -97.3300 251.000 30.0 158.790 5.320 -999.990 -999.990 1.588 ..P WKT 2011 02 11 12 39 55 31.3200 -97.3300 251.000 122.0 148.350 4.340 -999.990 -999.990 1.484 ..P WKT 2011 02 11 12 44 55 31.3200 -97.3300 251.000 457.0 126.673 4.180 -999.990 -999.990 1.267 ..P WKT 2011 02 11 12 54 55 31.3200 -97.3300 251.000 30.0 153.205 5.700 -999.990 -999.990 1.532 ..P WKT 2011 02 11 12 59 55 31.3200 -97.3300 251.000 122.0 149.419 5.160 -999.990 -999.990 1.494 ..P WKT 2011 02 11 13 04 55 31.3200 -97.3300 251.000 457.0 126.351 4.400 -999.990 -999.990 1.264 ..P WKT 2011 02 11 13 09 55 31.3200 -97.3300 251.000 30.0 152.577 4.930 -999.990 -999.990 1.526 ..P WKT 2011 02 11 13 14 55 31.3200 -97.3300 251.000 122.0 139.404 5.390 -999.990 -999.990 1.394 ..P WKT 2011 02 11 13 19 55 31.3200 -97.3300 251.000 457.0 125.731 5.520 -999.990 -999.990 1.257 ..P WKT 2011 02 11 13 29 55 31.3200 -97.3300 251.000 30.0 148.787 5.810 -999.990 -999.990 1.488 ..P WKT 2011 02 11 13 34 55 31.3200 -97.3300 251.000 122.0 135.571 5.740 -999.990 -999.990 1.356 ..P WKT 2011 02 11 13 39 55 31.3200 -97.3300 251.000 457.0 126.212 6.340 -999.990 -999.990 1.262 ..P WKT 2011 02 11 13 44 55 31.3200 -97.3300 251.000 30.0 158.906 4.930 -999.990 -999.990 1.589 ..P WKT 2011 02 11 13 49 55 31.3200 -97.3300 251.000 122.0 146.028 5.380 -999.990 -999.990 1.460 ..P WKT 2011 02 11 13 54 55 31.3200 -97.3300 251.000 457.0 133.991 5.220 -999.990 -999.990 1.340 ..P WKT 2011 02 11 14 04 55 31.3200 -97.3300 251.000 30.0 149.781 4.650 -999.990 -999.990 1.498 ..P WKT 2011 02 11 14 09 55 31.3200 -97.3300 251.000 122.0 144.780 5.070 -999.990 -999.990 1.448 ..P WKT 2011 02 11 14 14 55 31.3200 -97.3300 251.000 457.0 133.249 4.790 -999.990 -999.990 1.332 ..P WKT 2011 02 11 14 19 55 31.3200 -97.3300 251.000 30.0 150.517 5.340 -999.990 -999.990 1.505 ..P WKT 2011 02 11 14 24 55 31.3200 -97.3300 251.000 122.0 145.517 4.720 -999.990 -999.990 1.455 ..P WKT 2011 02 11 14 29 55 31.3200 -97.3300 251.000 457.0 132.317 4.530 -999.990 -999.990 1.323 ..P WKT 2011 02 11 14 39 55 31.3200 -97.3300 251.000 30.0 170.234 4.970 -999.990 -999.990 1.702 ..P WKT 2011 02 11 14 44 55 31.3200 -97.3300 251.000 122.0 140.015 4.430 -999.990 -999.990 1.400 ..P WKT 2011 02 11 14 49 55 31.3200 -97.3300 251.000 457.0 136.572 3.940 -999.990 -999.990 1.366 ..P WKT 2011 02 11 14 54 55 31.3200 -97.3300 251.000 30.0 162.909 3.950 -999.990 -999.990 1.629 ..P WKT 2011 02 11 14 59 55 31.3200 -97.3300 251.000 122.0 144.075 3.750 -999.990 -999.990 1.441 ..P WKT 2011 02 11 15 04 55 31.3200 -97.3300 251.000 457.0 152.007 4.800 -999.990 -999.990 1.520 ..P WKT 2011 02 11 15 14 55 31.3200 -97.3300 251.000 30.0 165.669 3.450 -999.990 -999.990 1.657 ..P WKT 2011 02 11 15 19 55 31.3200 -97.3300 251.000 122.0 152.671 3.770 -999.990 -999.990 1.527 ..P WKT 2011 02 11 15 24 55 31.3200 -97.3300 251.000 457.0 142.015 3.800 -999.990 -999.990 1.420 ..P WKT 2011 02 11 15 29 55 31.3200 -97.3300 251.000 30.0 159.450 3.790 -999.990 -999.990 1.595 ..P WKT 2011 02 11 15 34 55 31.3200 -97.3300 251.000 122.0 159.494 3.450 -999.990 -999.990 1.595 ..P WKT 2011 02 11 15 39 55 31.3200 -97.3300 251.000 457.0 145.832 3.590 -999.990 -999.990 1.458 ..P WKT 2011 02 11 15 49 55 31.3200 -97.3300 251.000 30.0 151.703 4.190 -999.990 -999.990 1.517 ..P WKT 2011 02 11 15 54 55 31.3200 -97.3300 251.000 122.0 154.184 3.440 -999.990 -999.990 1.542 ..P WKT 2011 02 11 15 59 55 31.3200 -97.3300 251.000 457.0 142.629 3.580 -999.990 -999.990 1.426 ..P WKT 2011 02 11 16 04 55 31.3200 -97.3300 251.000 30.0 153.799 3.620 -999.990 -999.990 1.538 ..P WKT 2011 02 11 16 09 55 31.3200 -97.3300 251.000 122.0 150.932 3.390 -999.990 -999.990 1.509 ..P WKT 2011 02 11 16 14 55 31.3200 -97.3300 251.000 457.0 157.755 3.510 -999.990 -999.990 1.578 ..P WKT 2011 02 11 16 24 55 31.3200 -97.3300 251.000 30.0 159.969 3.560 -999.990 -999.990 1.600 ..P WKT 2011 02 11 16 29 55 31.3200 -97.3300 251.000 122.0 166.216 4.030 -999.990 -999.990 1.662 ..P WKT 2011 02 11 16 34 55 31.3200 -97.3300 251.000 457.0 160.441 3.840 -999.990 -999.990 1.604 ..P WKT 2011 02 11 16 39 55 31.3200 -97.3300 251.000 30.0 173.699 4.110 -999.990 -999.990 1.737 ..P WKT 2011 02 11 16 44 55 31.3200 -97.3300 251.000 122.0 165.419 4.600 -999.990 -999.990 1.654 ..P WKT 2011 02 11 16 49 55 31.3200 -97.3300 251.000 457.0 153.470 4.300 -999.990 -999.990 1.535 ..P WKT 2011 02 11 17 04 55 31.3200 -97.3300 251.000 30.0 163.714 4.110 -999.990 -999.990 1.637 ..P WKT 2011 02 11 17 09 55 31.3200 -97.3300 251.000 122.0 162.877 4.260 -999.990 -999.990 1.629 ..P WKT 2011 02 11 17 14 55 31.3200 -97.3300 251.000 457.0 150.528 4.330 -999.990 -999.990 1.505 ..P WKT 2011 02 11 17 19 55 31.3200 -97.3300 251.000 30.0 169.544 4.320 -999.990 -999.990 1.695 ..P WKT 2011 02 11 17 24 55 31.3200 -97.3300 251.000 122.0 160.199 4.500 -999.990 -999.990 1.602 ..P WKT 2011 02 11 17 29 55 31.3200 -97.3300 251.000 457.0 146.853 4.620 -999.990 -999.990 1.469 ..P WKT 2011 02 11 17 39 55 31.3200 -97.3300 251.000 30.0 171.626 5.210 -999.990 -999.990 1.716 ..P WKT 2011 02 11 17 44 55 31.3200 -97.3300 251.000 122.0 171.551 4.590 -999.990 -999.990 1.716 ..P WKT 2011 02 11 17 49 55 31.3200 -97.3300 251.000 457.0 164.140 4.370 -999.990 -999.990 1.641 ..P WKT 2011 02 11 17 54 55 31.3200 -97.3300 251.000 30.0 164.566 4.150 -999.990 -999.990 1.646 ..P WKT 2011 02 11 17 59 55 31.3200 -97.3300 251.000 122.0 164.325 4.080 -999.990 -999.990 1.643 ..P WKT 2011 02 11 18 04 55 31.3200 -97.3300 251.000 457.0 162.917 4.160 -999.990 -999.990 1.629 ..P WKT 2011 02 11 18 14 55 31.3200 -97.3300 251.000 30.0 167.434 4.320 -999.990 -999.990 1.674 ..P WKT 2011 02 11 18 19 55 31.3200 -97.3300 251.000 122.0 170.692 3.490 -999.990 -999.990 1.707 ..P WKT 2011 02 11 18 24 55 31.3200 -97.3300 251.000 457.0 150.457 4.460 -999.990 -999.990 1.505 ..P WKT 2011 02 11 18 29 55 31.3200 -97.3300 251.000 30.0 154.549 3.320 -999.990 -999.990 1.545 ..P WKT 2011 02 11 18 34 55 31.3200 -97.3300 251.000 122.0 149.978 3.230 -999.990 -999.990 1.500 ..P WKT 2011 02 11 18 39 55 31.3200 -97.3300 251.000 457.0 150.404 3.680 -999.990 -999.990 1.504 ..P WKT 2011 02 11 18 49 55 31.3200 -97.3300 251.000 30.0 149.877 3.700 -999.990 -999.990 1.499 ..P WKT 2011 02 11 18 54 55 31.3200 -97.3300 251.000 122.0 149.590 3.100 -999.990 -999.990 1.496 ..P WKT 2011 02 11 18 59 55 31.3200 -97.3300 251.000 457.0 152.966 3.930 -999.990 -999.990 1.530 ..P WKT 2011 02 11 19 04 55 31.3200 -97.3300 251.000 30.0 147.351 3.270 -999.990 -999.990 1.474 ..P WKT 2011 02 11 19 09 55 31.3200 -97.3300 251.000 122.0 151.059 3.120 -999.990 -999.990 1.511 ..P WKT 2011 02 11 19 14 55 31.3200 -97.3300 251.000 457.0 151.106 4.500 -999.990 -999.990 1.511 ..P WKT 2011 02 11 19 24 55 31.3200 -97.3300 251.000 30.0 147.155 4.940 -999.990 -999.990 1.472 ..P WKT 2011 02 11 19 29 55 31.3200 -97.3300 251.000 122.0 142.828 4.310 -999.990 -999.990 1.428 ..P WKT 2011 02 11 19 34 55 31.3200 -97.3300 251.000 457.0 142.494 6.170 -999.990 -999.990 1.425 ..P WKT 2011 02 11 19 39 55 31.3200 -97.3300 251.000 30.0 138.501 3.350 -999.990 -999.990 1.385 ..P WKT 2011 02 11 19 44 55 31.3200 -97.3300 251.000 122.0 142.492 3.510 -999.990 -999.990 1.425 ..P WKT 2011 02 11 19 49 55 31.3200 -97.3300 251.000 457.0 143.156 2.880 -999.990 -999.990 1.432 ..P WKT 2011 02 11 19 59 55 31.3200 -97.3300 251.000 30.0 140.375 3.210 -999.990 -999.990 1.404 ..P WKT 2011 02 11 20 04 55 31.3200 -97.3300 251.000 122.0 138.260 3.490 -999.990 -999.990 1.383 ..P WKT 2011 02 11 20 09 55 31.3200 -97.3300 251.000 457.0 137.476 4.280 -999.990 -999.990 1.375 ..P WKT 2011 02 11 20 14 55 31.3200 -97.3300 251.000 30.0 144.339 4.880 -999.990 -999.990 1.443 ..P WKT 2011 02 11 20 19 55 31.3200 -97.3300 251.000 122.0 143.222 4.460 -999.990 -999.990 1.432 ..P WKT 2011 02 11 20 24 55 31.3200 -97.3300 251.000 457.0 145.762 3.740 -999.990 -999.990 1.458 ..P WKT 2011 02 11 20 34 55 31.3200 -97.3300 251.000 30.0 144.667 3.330 -999.990 -999.990 1.447 ..P WKT 2011 02 11 20 39 55 31.3200 -97.3300 251.000 122.0 138.375 4.700 -999.990 -999.990 1.384 ..P WKT 2011 02 11 20 44 55 31.3200 -97.3300 251.000 457.0 140.227 5.090 -999.990 -999.990 1.402 ..P WKT 2011 02 11 20 49 55 31.3200 -97.3300 251.000 30.0 142.742 4.050 -999.990 -999.990 1.427 ..P WKT 2011 02 11 20 54 55 31.3200 -97.3300 251.000 122.0 148.246 4.900 -999.990 -999.990 1.482 ..P WKT 2011 02 11 20 59 55 31.3200 -97.3300 251.000 457.0 141.956 3.610 -999.990 -999.990 1.420 ..P WKT 2011 02 11 21 09 55 31.3200 -97.3300 251.000 30.0 143.805 3.110 -999.990 -999.990 1.438 ..P WKT 2011 02 11 21 14 55 31.3200 -97.3300 251.000 122.0 137.495 3.850 -999.990 -999.990 1.375 ..P WKT 2011 02 11 21 19 55 31.3200 -97.3300 251.000 457.0 142.475 4.310 -999.990 -999.990 1.425 ..P WKT 2011 02 11 21 24 55 31.3200 -97.3300 251.000 30.0 136.166 3.570 -999.990 -999.990 1.362 ..P WKT 2011 02 11 21 29 55 31.3200 -97.3300 251.000 122.0 137.327 4.430 -999.990 -999.990 1.373 ..P WKT 2011 02 11 21 34 55 31.3200 -97.3300 251.000 457.0 142.970 4.400 -999.990 -999.990 1.430 ..P WKT 2011 02 11 21 44 55 31.3200 -97.3300 251.000 30.0 142.517 3.830 -999.990 -999.990 1.425 ..P WKT 2011 02 11 21 49 55 31.3200 -97.3300 251.000 122.0 145.053 4.000 -999.990 -999.990 1.451 ..P WKT 2011 02 11 21 54 55 31.3200 -97.3300 251.000 457.0 142.279 3.780 -999.990 -999.990 1.423 ..P WKT 2011 02 11 21 59 55 31.3200 -97.3300 251.000 30.0 143.652 4.660 -999.990 -999.990 1.437 ..P WKT 2011 02 11 22 04 55 31.3200 -97.3300 251.000 122.0 137.893 3.550 -999.990 -999.990 1.379 ..P WKT 2011 02 11 22 09 55 31.3200 -97.3300 251.000 457.0 138.603 3.060 -999.990 -999.990 1.386 ..P WKT 2011 02 11 22 19 55 31.3200 -97.3300 251.000 30.0 134.765 3.380 -999.990 -999.990 1.348 ..P WKT 2011 02 11 22 24 55 31.3200 -97.3300 251.000 122.0 139.999 3.900 -999.990 -999.990 1.400 ..P WKT 2011 02 11 22 29 55 31.3200 -97.3300 251.000 457.0 147.389 4.160 -999.990 -999.990 1.474 ..P WKT 2011 02 11 22 34 55 31.3200 -97.3300 251.000 30.0 137.536 3.510 -999.990 -999.990 1.375 ..P WKT 2011 02 11 22 39 55 31.3200 -97.3300 251.000 122.0 143.265 3.670 -999.990 -999.990 1.433 ..P WKT 2011 02 11 22 44 55 31.3200 -97.3300 251.000 457.0 142.033 3.340 -999.990 -999.990 1.420 ..P WKT 2011 02 11 22 54 55 31.3200 -97.3300 251.000 30.0 146.245 4.390 -999.990 -999.990 1.462 ..P WKT 2011 02 11 22 59 55 31.3200 -97.3300 251.000 122.0 146.718 3.350 -999.990 -999.990 1.467 ..P WKT 2011 02 11 23 04 55 31.3200 -97.3300 251.000 457.0 141.556 3.940 -999.990 -999.990 1.416 ..P WKT 2011 02 11 23 09 55 31.3200 -97.3300 251.000 30.0 137.059 3.180 -999.990 -999.990 1.371 ..P WKT 2011 02 11 23 14 55 31.3200 -97.3300 251.000 122.0 144.158 2.890 -999.990 -999.990 1.442 ..P WKT 2011 02 11 23 19 55 31.3200 -97.3300 251.000 457.0 144.630 2.580 -999.990 -999.990 1.446 ..P WKT 2011 02 11 23 29 55 31.3200 -97.3300 251.000 30.0 137.566 3.620 -999.990 -999.990 1.376 ..P WKT 2011 02 11 23 34 55 31.3200 -97.3300 251.000 122.0 142.947 2.230 -999.990 -999.990 1.429 ..P WKT 2011 02 11 23 39 55 31.3200 -97.3300 251.000 457.0 144.353 3.260 -999.990 -999.990 1.444 ..P WKT 2011 02 11 23 44 55 31.3200 -97.3300 251.000 30.0 137.813 2.910 -999.990 -999.990 1.378 ..P WKT 2011 02 11 23 49 55 31.3200 -97.3300 251.000 122.0 141.537 3.490 -999.990 -999.990 1.415 ..P WKT 2011 02 12 00 09 55 31.3200 -97.3300 251.000 457.0 167.715 4.490 -999.990 -999.990 1.677 ..P WKT 2011 02 12 00 10 25 31.3200 -97.3300 251.000 457.0 162.133 3.440 -999.990 -999.990 1.621 ..P WKT 2011 02 12 00 10 55 31.3200 -97.3300 251.000 457.0 155.228 2.530 -999.990 -999.990 1.552 ..P WKT 2011 02 12 00 11 25 31.3200 -97.3300 251.000 457.0 157.259 2.550 -999.990 -999.990 1.573 ..P WKT 2011 02 12 00 11 55 31.3200 -97.3300 251.000 457.0 148.368 3.190 -999.990 -999.990 1.484 ..P WKT 2011 02 12 00 12 25 31.3200 -97.3300 251.000 457.0 148.414 2.370 -999.990 -999.990 1.484 ..P WKT 2011 02 12 00 12 55 31.3200 -97.3300 251.000 457.0 142.501 2.470 -999.990 -999.990 1.425 ..P WKT 2011 02 12 00 13 25 31.3200 -97.3300 251.000 457.0 142.547 2.340 -999.990 -999.990 1.425 ..P WKT 2011 02 12 00 13 55 31.3200 -97.3300 251.000 457.0 152.853 3.730 -999.990 -999.990 1.529 ..P WKT 2011 02 12 00 14 25 31.3200 -97.3300 251.000 457.0 152.403 2.870 -999.990 -999.990 1.524 ..P WKT 2011 02 12 00 14 55 31.3200 -97.3300 251.000 457.0 150.959 2.520 -999.990 -999.990 1.510 ..P WKT 2011 02 12 00 19 55 31.3200 -97.3300 251.000 30.0 145.127 3.070 -999.990 -999.990 1.451 ..P WKT 2011 02 12 00 24 55 31.3200 -97.3300 251.000 122.0 148.562 3.470 -999.990 -999.990 1.486 ..P WKT 2011 02 12 00 29 55 31.3200 -97.3300 251.000 457.0 144.220 4.190 -999.990 -999.990 1.442 ..P WKT 2011 02 12 00 34 55 31.3200 -97.3300 251.000 30.0 153.282 4.060 -999.990 -999.990 1.533 ..P WKT 2011 02 12 00 39 55 31.3200 -97.3300 251.000 122.0 148.773 4.020 -999.990 -999.990 1.488 ..P WKT 2011 02 12 00 44 55 31.3200 -97.3300 251.000 457.0 148.568 3.090 -999.990 -999.990 1.486 ..P WKT 2011 02 12 00 54 55 31.3200 -97.3300 251.000 30.0 150.795 2.840 -999.990 -999.990 1.508 ..P WKT 2011 02 12 00 59 55 31.3200 -97.3300 251.000 122.0 150.414 3.480 -999.990 -999.990 1.504 ..P WKT 2011 02 12 01 04 55 31.3200 -97.3300 251.000 457.0 150.032 4.010 -999.990 -999.990 1.500 ..P WKT 2011 02 12 01 09 55 31.3200 -97.3300 251.000 30.0 146.341 3.470 -999.990 -999.990 1.463 ..P WKT 2011 02 12 01 14 55 31.3200 -97.3300 251.000 122.0 135.865 3.490 -999.990 -999.990 1.359 ..P WKT 2011 02 12 01 19 55 31.3200 -97.3300 251.000 457.0 148.226 4.390 -999.990 -999.990 1.482 ..P WKT 2011 02 12 01 29 55 31.3200 -97.3300 251.000 30.0 145.193 2.650 -999.990 -999.990 1.452 ..P WKT 2011 02 12 01 34 55 31.3200 -97.3300 251.000 122.0 137.578 3.120 -999.990 -999.990 1.376 ..P WKT 2011 02 12 01 39 55 31.3200 -97.3300 251.000 457.0 142.705 3.250 -999.990 -999.990 1.427 ..P WKT 2011 02 12 01 44 55 31.3200 -97.3300 251.000 30.0 147.005 3.660 -999.990 -999.990 1.470 ..P WKT 2011 02 12 01 49 55 31.3200 -97.3300 251.000 122.0 139.720 4.140 -999.990 -999.990 1.397 ..P WKT 2011 02 12 01 54 55 31.3200 -97.3300 251.000 457.0 145.509 3.810 -999.990 -999.990 1.455 ..P WKT 2011 02 12 02 04 55 31.3200 -97.3300 251.000 30.0 144.060 2.770 -999.990 -999.990 1.441 ..P WKT 2011 02 12 02 09 55 31.3200 -97.3300 251.000 122.0 133.017 3.970 -999.990 -999.990 1.330 ..P WKT 2011 02 12 02 14 55 31.3200 -97.3300 251.000 457.0 147.789 3.070 -999.990 -999.990 1.478 ..P WKT 2011 02 12 02 19 55 31.3200 -97.3300 251.000 30.0 137.408 2.730 -999.990 -999.990 1.374 ..P WKT 2011 02 12 02 24 55 31.3200 -97.3300 251.000 122.0 139.273 2.670 -999.990 -999.990 1.393 ..P WKT 2011 02 12 02 29 55 31.3200 -97.3300 251.000 457.0 145.109 2.600 -999.990 -999.990 1.451 ..P WKT 2011 02 12 02 39 55 31.3200 -97.3300 251.000 30.0 143.519 3.090 -999.990 -999.990 1.435 ..P WKT 2011 02 12 02 44 55 31.3200 -97.3300 251.000 122.0 139.402 2.600 -999.990 -999.990 1.394 ..P WKT 2011 02 12 02 49 55 31.3200 -97.3300 251.000 457.0 147.531 2.550 -999.990 -999.990 1.475 ..P WKT 2011 02 12 02 54 55 31.3200 -97.3300 251.000 30.0 140.436 2.730 -999.990 -999.990 1.404 ..P WKT 2011 02 12 02 59 55 31.3200 -97.3300 251.000 122.0 143.600 2.720 -999.990 -999.990 1.436 ..P WKT 2011 02 12 03 04 55 31.3200 -97.3300 251.000 457.0 151.398 2.800 -999.990 -999.990 1.514 ..P WKT 2011 02 12 03 14 55 31.3200 -97.3300 251.000 30.0 138.674 3.260 -999.990 -999.990 1.387 ..P WKT 2011 02 12 03 19 55 31.3200 -97.3300 251.000 122.0 139.002 3.080 -999.990 -999.990 1.390 ..P WKT 2011 02 12 03 24 55 31.3200 -97.3300 251.000 457.0 144.625 3.070 -999.990 -999.990 1.446 ..P WKT 2011 02 12 03 29 55 31.3200 -97.3300 251.000 30.0 137.672 3.140 -999.990 -999.990 1.377 ..P WKT 2011 02 12 03 34 55 31.3200 -97.3300 251.000 122.0 138.000 2.740 -999.990 -999.990 1.380 ..P WKT 2011 02 12 03 39 55 31.3200 -97.3300 251.000 457.0 146.271 3.120 -999.990 -999.990 1.463 ..P WKT 2011 02 12 03 49 55 31.3200 -97.3300 251.000 30.0 134.209 2.860 -999.990 -999.990 1.342 ..P WKT 2011 02 12 03 54 55 31.3200 -97.3300 251.000 122.0 142.668 3.050 -999.990 -999.990 1.427 ..P WKT 2011 02 12 03 59 55 31.3200 -97.3300 251.000 457.0 146.825 4.750 -999.990 -999.990 1.468 ..P WKT 2011 02 12 04 04 55 31.3200 -97.3300 251.000 30.0 139.399 3.860 -999.990 -999.990 1.394 ..P WKT 2011 02 12 04 09 55 31.3200 -97.3300 251.000 122.0 137.931 3.820 -999.990 -999.990 1.379 ..P WKT 2011 02 12 04 14 55 31.3200 -97.3300 251.000 457.0 148.872 4.520 -999.990 -999.990 1.489 ..P WKT 2011 02 12 04 24 55 31.3200 -97.3300 251.000 30.0 135.346 3.960 -999.990 -999.990 1.353 ..P WKT 2011 02 12 04 29 55 31.3200 -97.3300 251.000 122.0 139.998 4.240 -999.990 -999.990 1.400 ..P WKT 2011 02 12 04 34 55 31.3200 -97.3300 251.000 457.0 157.061 5.200 -999.990 -999.990 1.571 ..P WKT 2011 02 12 04 39 55 31.3200 -97.3300 251.000 30.0 130.774 4.770 -999.990 -999.990 1.308 ..P WKT 2011 02 12 04 44 55 31.3200 -97.3300 251.000 122.0 138.406 3.560 -999.990 -999.990 1.384 ..P WKT 2011 02 12 04 49 55 31.3200 -97.3300 251.000 457.0 150.339 3.120 -999.990 -999.990 1.503 ..P WKT 2011 02 12 05 04 55 31.3200 -97.3300 251.000 30.0 133.932 4.180 -999.990 -999.990 1.339 ..P WKT 2011 02 12 05 09 55 31.3200 -97.3300 251.000 122.0 142.843 3.500 -999.990 -999.990 1.428 ..P WKT 2011 02 12 05 14 55 31.3200 -97.3300 251.000 457.0 138.848 3.230 -999.990 -999.990 1.388 ..P WKT 2011 02 12 05 19 55 31.3200 -97.3300 251.000 30.0 129.725 3.360 -999.990 -999.990 1.297 ..P WKT 2011 02 12 05 24 55 31.3200 -97.3300 251.000 122.0 138.966 3.190 -999.990 -999.990 1.390 ..P WKT 2011 02 12 05 29 55 31.3200 -97.3300 251.000 457.0 140.762 3.250 -999.990 -999.990 1.408 ..P WKT 2011 02 12 05 39 55 31.3200 -97.3300 251.000 30.0 134.354 3.040 -999.990 -999.990 1.344 ..P WKT 2011 02 12 05 44 55 31.3200 -97.3300 251.000 122.0 138.227 3.760 -999.990 -999.990 1.382 ..P WKT 2011 02 12 05 49 55 31.3200 -97.3300 251.000 457.0 156.659 3.050 -999.990 -999.990 1.567 ..P WKT 2011 02 12 05 54 55 31.3200 -97.3300 251.000 30.0 139.190 3.110 -999.990 -999.990 1.392 ..P WKT 2011 02 12 05 59 55 31.3200 -97.3300 251.000 122.0 142.070 3.580 -999.990 -999.990 1.421 ..P WKT 2011 02 12 06 04 55 31.3200 -97.3300 251.000 457.0 160.502 3.400 -999.990 -999.990 1.605 ..P WKT 2011 02 12 06 14 55 31.3200 -97.3300 251.000 30.0 144.708 3.050 -999.990 -999.990 1.447 ..P WKT 2011 02 12 06 19 55 31.3200 -97.3300 251.000 122.0 137.284 2.630 -999.990 -999.990 1.373 ..P WKT 2011 02 12 06 24 55 31.3200 -97.3300 251.000 457.0 152.028 4.180 -999.990 -999.990 1.520 ..P WKT 2011 02 12 06 29 55 31.3200 -97.3300 251.000 30.0 147.913 3.480 -999.990 -999.990 1.479 ..P WKT 2011 02 12 06 34 55 31.3200 -97.3300 251.000 122.0 144.790 4.410 -999.990 -999.990 1.448 ..P WKT 2011 02 12 06 39 55 31.3200 -97.3300 251.000 457.0 171.777 3.590 -999.990 -999.990 1.718 ..P WKT 2011 02 12 06 49 55 31.3200 -97.3300 251.000 30.0 150.973 2.540 -999.990 -999.990 1.510 ..P WKT 2011 02 12 06 54 55 31.3200 -97.3300 251.000 122.0 147.519 2.810 -999.990 -999.990 1.475 ..P WKT 2011 02 12 06 59 55 31.3200 -97.3300 251.000 457.0 170.865 3.200 -999.990 -999.990 1.709 ..P WKT 2011 02 12 07 04 55 31.3200 -97.3300 251.000 30.0 173.698 3.270 -999.990 -999.990 1.737 ..P WKT 2011 02 12 07 09 55 31.3200 -97.3300 251.000 122.0 147.745 4.360 -999.990 -999.990 1.477 ..P WKT 2011 02 12 07 14 55 31.3200 -97.3300 251.000 457.0 186.641 4.680 -999.990 -999.990 1.866 ..P WKT 2011 02 12 07 24 55 31.3200 -97.3300 251.000 30.0 186.398 3.110 -999.990 -999.990 1.864 ..P WKT 2011 02 12 07 29 55 31.3200 -97.3300 251.000 122.0 141.967 3.420 -999.990 -999.990 1.420 ..P WKT 2011 02 12 07 34 55 31.3200 -97.3300 251.000 457.0 167.344 2.850 -999.990 -999.990 1.673 ..P WKT 2011 02 12 07 39 55 31.3200 -97.3300 251.000 30.0 146.403 4.780 -999.990 -999.990 1.464 ..P WKT 2011 02 12 07 44 55 31.3200 -97.3300 251.000 122.0 141.012 4.100 -999.990 -999.990 1.410 ..P WKT 2011 02 12 07 49 55 31.3200 -97.3300 251.000 457.0 159.111 2.730 -999.990 -999.990 1.591 ..P WKT 2011 02 12 07 59 55 31.3200 -97.3300 251.000 30.0 159.672 3.790 -999.990 -999.990 1.597 ..P WKT 2011 02 12 08 04 55 31.3200 -97.3300 251.000 122.0 141.473 2.890 -999.990 -999.990 1.415 ..P WKT 2011 02 12 08 09 55 31.3200 -97.3300 251.000 457.0 159.003 2.950 -999.990 -999.990 1.590 ..P WKT 2011 02 12 08 14 55 31.3200 -97.3300 251.000 30.0 161.978 2.850 -999.990 -999.990 1.620 ..P WKT 2011 02 12 08 19 55 31.3200 -97.3300 251.000 122.0 146.591 2.940 -999.990 -999.990 1.466 ..P WKT 2011 02 12 08 24 55 31.3200 -97.3300 251.000 457.0 158.663 3.170 -999.990 -999.990 1.587 ..P WKT 2011 02 12 08 34 55 31.3200 -97.3300 251.000 30.0 164.682 2.570 -999.990 -999.990 1.647 ..P WKT 2011 02 12 08 39 55 31.3200 -97.3300 251.000 122.0 145.893 2.740 -999.990 -999.990 1.459 ..P WKT 2011 02 12 08 44 55 31.3200 -97.3300 251.000 457.0 151.420 5.170 -999.990 -999.990 1.514 ..P WKT 2011 02 12 08 49 55 31.3200 -97.3300 251.000 30.0 157.938 3.620 -999.990 -999.990 1.579 ..P WKT 2011 02 12 08 54 55 31.3200 -97.3300 251.000 122.0 150.397 3.720 -999.990 -999.990 1.504 ..P WKT 2011 02 12 08 59 55 31.3200 -97.3300 251.000 457.0 152.284 3.560 -999.990 -999.990 1.523 ..P WKT 2011 02 12 09 09 55 31.3200 -97.3300 251.000 30.0 151.120 2.850 -999.990 -999.990 1.511 ..P WKT 2011 02 12 09 14 55 31.3200 -97.3300 251.000 122.0 148.234 4.260 -999.990 -999.990 1.482 ..P WKT 2011 02 12 09 19 55 31.3200 -97.3300 251.000 457.0 147.333 2.910 -999.990 -999.990 1.473 ..P WKT 2011 02 12 09 24 55 31.3200 -97.3300 251.000 30.0 152.883 3.400 -999.990 -999.990 1.529 ..P WKT 2011 02 12 09 29 55 31.3200 -97.3300 251.000 122.0 144.704 3.330 -999.990 -999.990 1.447 ..P WKT 2011 02 12 09 34 55 31.3200 -97.3300 251.000 457.0 146.450 4.170 -999.990 -999.990 1.464 ..P WKT 2011 02 12 09 44 55 31.3200 -97.3300 251.000 30.0 156.036 4.340 -999.990 -999.990 1.560 ..P WKT 2011 02 12 09 49 55 31.3200 -97.3300 251.000 122.0 146.015 3.710 -999.990 -999.990 1.460 ..P WKT 2011 02 12 09 54 55 31.3200 -97.3300 251.000 457.0 152.698 3.810 -999.990 -999.990 1.527 ..P WKT 2011 02 12 09 59 55 31.3200 -97.3300 251.000 30.0 157.563 3.250 -999.990 -999.990 1.576 ..P WKT 2011 02 12 10 04 55 31.3200 -97.3300 251.000 122.0 148.864 3.290 -999.990 -999.990 1.489 ..P WKT 2011 02 12 10 09 55 31.3200 -97.3300 251.000 457.0 142.813 2.930 -999.990 -999.990 1.428 ..P WKT 2011 02 12 10 19 55 31.3200 -97.3300 251.000 30.0 152.683 4.480 -999.990 -999.990 1.527 ..P WKT 2011 02 12 10 24 55 31.3200 -97.3300 251.000 122.0 129.572 2.720 -999.990 -999.990 1.296 ..P WKT 2011 02 12 10 29 55 31.3200 -97.3300 251.000 457.0 148.140 2.520 -999.990 -999.990 1.481 ..P WKT 2011 02 12 10 34 55 31.3200 -97.3300 251.000 30.0 158.108 2.550 -999.990 -999.990 1.581 ..P WKT 2011 02 12 10 39 55 31.3200 -97.3300 251.000 122.0 139.297 4.250 -999.990 -999.990 1.393 ..P WKT 2011 02 12 10 44 55 31.3200 -97.3300 251.000 457.0 192.928 2.720 -999.990 -999.990 1.929 ..P WKT 2011 02 12 10 54 55 31.3200 -97.3300 251.000 30.0 161.686 3.310 -999.990 -999.990 1.617 ..P WKT 2011 02 12 10 59 55 31.3200 -97.3300 251.000 122.0 157.194 3.100 -999.990 -999.990 1.572 ..P WKT 2011 02 12 11 04 55 31.3200 -97.3300 251.000 457.0 177.510 4.340 -999.990 -999.990 1.775 ..P WKT 2011 02 12 11 09 55 31.3200 -97.3300 251.000 30.0 160.779 4.070 -999.990 -999.990 1.608 ..P WKT 2011 02 12 11 14 55 31.3200 -97.3300 251.000 122.0 144.048 3.440 -999.990 -999.990 1.440 ..P WKT 2011 02 12 11 19 55 31.3200 -97.3300 251.000 457.0 169.987 3.730 -999.990 -999.990 1.700 ..P WKT 2011 02 12 11 29 55 31.3200 -97.3300 251.000 30.0 176.365 3.810 -999.990 -999.990 1.764 ..P WKT 2011 02 12 11 34 55 31.3200 -97.3300 251.000 122.0 141.260 3.410 -999.990 -999.990 1.413 ..P WKT 2011 02 12 11 39 55 31.3200 -97.3300 251.000 457.0 157.092 3.280 -999.990 -999.990 1.571 ..P WKT 2011 02 12 11 44 55 31.3200 -97.3300 251.000 30.0 195.084 4.940 -999.990 -999.990 1.951 ..P WKT 2011 02 12 11 49 55 31.3200 -97.3300 251.000 122.0 143.111 3.030 -999.990 -999.990 1.431 ..P WKT 2011 02 12 12 09 55 31.3200 -97.3300 251.000 457.0 140.383 3.450 -999.990 -999.990 1.404 ..P WKT 2011 02 12 12 10 25 31.3200 -97.3300 251.000 457.0 141.214 3.930 -999.990 -999.990 1.412 ..P WKT 2011 02 12 12 10 55 31.3200 -97.3300 251.000 457.0 146.346 3.680 -999.990 -999.990 1.463 ..P WKT 2011 02 12 12 11 25 31.3200 -97.3300 251.000 457.0 141.719 3.700 -999.990 -999.990 1.417 ..P WKT 2011 02 12 12 11 55 31.3200 -97.3300 251.000 457.0 140.400 3.140 -999.990 -999.990 1.404 ..P WKT 2011 02 12 12 12 25 31.3200 -97.3300 251.000 457.0 142.555 3.180 -999.990 -999.990 1.426 ..P WKT 2011 02 12 12 12 55 31.3200 -97.3300 251.000 457.0 145.866 3.170 -999.990 -999.990 1.459 ..P WKT 2011 02 12 12 13 25 31.3200 -97.3300 251.000 457.0 146.533 3.060 -999.990 -999.990 1.465 ..P WKT 2011 02 12 12 13 55 31.3200 -97.3300 251.000 457.0 145.875 3.480 -999.990 -999.990 1.459 ..P WKT 2011 02 12 12 14 25 31.3200 -97.3300 251.000 457.0 142.571 2.840 -999.990 -999.990 1.426 ..P WKT 2011 02 12 12 14 55 31.3200 -97.3300 251.000 457.0 142.576 3.230 -999.990 -999.990 1.426 ..P WKT 2011 02 12 12 19 55 31.3200 -97.3300 251.000 30.0 187.278 3.680 -999.990 -999.990 1.873 ..P WKT 2011 02 12 12 24 55 31.3200 -97.3300 251.000 122.0 147.953 4.990 -999.990 -999.990 1.480 ..P WKT 2011 02 12 12 29 55 31.3200 -97.3300 251.000 457.0 138.731 3.800 -999.990 -999.990 1.387 ..P WKT 2011 02 12 12 34 55 31.3200 -97.3300 251.000 30.0 191.215 4.080 -999.990 -999.990 1.912 ..P WKT 2011 02 12 12 39 55 31.3200 -97.3300 251.000 122.0 154.862 3.900 -999.990 -999.990 1.549 ..P WKT 2011 02 12 12 44 55 31.3200 -97.3300 251.000 457.0 143.158 4.840 -999.990 -999.990 1.432 ..P WKT 2011 02 12 12 54 55 31.3200 -97.3300 251.000 30.0 196.816 4.450 -999.990 -999.990 1.968 ..P WKT 2011 02 12 12 59 55 31.3200 -97.3300 251.000 122.0 161.909 4.200 -999.990 -999.990 1.619 ..P WKT 2011 02 12 13 04 55 31.3200 -97.3300 251.000 457.0 138.251 4.210 -999.990 -999.990 1.383 ..P WKT 2011 02 12 13 09 55 31.3200 -97.3300 251.000 30.0 175.491 4.780 -999.990 -999.990 1.755 ..P WKT 2011 02 12 13 14 55 31.3200 -97.3300 251.000 122.0 147.032 5.440 -999.990 -999.990 1.470 ..P WKT 2011 02 12 13 19 55 31.3200 -97.3300 251.000 457.0 136.115 4.620 -999.990 -999.990 1.361 ..P WKT 2011 02 12 13 29 55 31.3200 -97.3300 251.000 30.0 161.141 4.420 -999.990 -999.990 1.611 ..P WKT 2011 02 12 13 34 55 31.3200 -97.3300 251.000 122.0 146.771 4.170 -999.990 -999.990 1.468 ..P WKT 2011 02 12 13 39 55 31.3200 -97.3300 251.000 457.0 139.847 5.730 -999.990 -999.990 1.398 ..P WKT 2011 02 12 13 44 55 31.3200 -97.3300 251.000 30.0 170.335 3.880 -999.990 -999.990 1.703 ..P WKT 2011 02 12 13 49 55 31.3200 -97.3300 251.000 122.0 144.705 3.660 -999.990 -999.990 1.447 ..P WKT 2011 02 12 13 54 55 31.3200 -97.3300 251.000 457.0 145.562 4.280 -999.990 -999.990 1.456 ..P WKT 2011 02 12 14 04 55 31.3200 -97.3300 251.000 30.0 181.998 2.950 -999.990 -999.990 1.820 ..P WKT 2011 02 12 14 09 55 31.3200 -97.3300 251.000 122.0 154.992 3.550 -999.990 -999.990 1.550 ..P WKT 2011 02 12 14 14 55 31.3200 -97.3300 251.000 457.0 132.951 3.530 -999.990 -999.990 1.330 ..P WKT 2011 02 12 14 19 55 31.3200 -97.3300 251.000 30.0 178.803 3.370 -999.990 -999.990 1.788 ..P WKT 2011 02 12 14 24 55 31.3200 -97.3300 251.000 122.0 148.812 3.610 -999.990 -999.990 1.488 ..P WKT 2011 02 12 14 29 55 31.3200 -97.3300 251.000 457.0 137.366 4.590 -999.990 -999.990 1.374 ..P WKT 2011 02 12 14 39 55 31.3200 -97.3300 251.000 30.0 175.139 3.640 -999.990 -999.990 1.751 ..P WKT 2011 02 12 14 44 55 31.3200 -97.3300 251.000 122.0 154.465 3.430 -999.990 -999.990 1.545 ..P WKT 2011 02 12 14 49 55 31.3200 -97.3300 251.000 457.0 140.414 3.930 -999.990 -999.990 1.404 ..P WKT 2011 02 12 14 54 55 31.3200 -97.3300 251.000 30.0 181.360 3.840 -999.990 -999.990 1.814 ..P WKT 2011 02 12 14 59 55 31.3200 -97.3300 251.000 122.0 144.447 3.330 -999.990 -999.990 1.444 ..P WKT 2011 02 12 15 04 55 31.3200 -97.3300 251.000 457.0 141.991 3.830 -999.990 -999.990 1.420 ..P WKT 2011 02 12 15 14 55 31.3200 -97.3300 251.000 30.0 174.523 3.600 -999.990 -999.990 1.745 ..P WKT 2011 02 12 15 19 55 31.3200 -97.3300 251.000 122.0 151.191 3.100 -999.990 -999.990 1.512 ..P WKT 2011 02 12 15 24 55 31.3200 -97.3300 251.000 457.0 135.147 2.890 -999.990 -999.990 1.351 ..P WKT 2011 02 12 15 29 55 31.3200 -97.3300 251.000 30.0 171.797 4.210 -999.990 -999.990 1.718 ..P WKT 2011 02 12 15 34 55 31.3200 -97.3300 251.000 122.0 150.450 4.230 -999.990 -999.990 1.504 ..P WKT 2011 02 12 15 39 55 31.3200 -97.3300 251.000 457.0 141.696 3.030 -999.990 -999.990 1.417 ..P WKT 2011 02 12 15 49 55 31.3200 -97.3300 251.000 30.0 168.272 3.100 -999.990 -999.990 1.683 ..P WKT 2011 02 12 15 54 55 31.3200 -97.3300 251.000 122.0 151.230 3.100 -999.990 -999.990 1.512 ..P WKT 2011 02 12 15 59 55 31.3200 -97.3300 251.000 457.0 139.822 3.230 -999.990 -999.990 1.398 ..P WKT 2011 02 12 16 04 55 31.3200 -97.3300 251.000 30.0 161.897 3.810 -999.990 -999.990 1.619 ..P WKT 2011 02 12 16 09 55 31.3200 -97.3300 251.000 122.0 155.794 3.970 -999.990 -999.990 1.558 ..P WKT 2011 02 12 16 14 55 31.3200 -97.3300 251.000 457.0 131.620 2.650 -999.990 -999.990 1.316 ..P WKT 2011 02 12 16 24 55 31.3200 -97.3300 251.000 30.0 152.898 3.460 -999.990 -999.990 1.529 ..P WKT 2011 02 12 16 29 55 31.3200 -97.3300 251.000 122.0 146.792 3.770 -999.990 -999.990 1.468 ..P WKT 2011 02 12 16 34 55 31.3200 -97.3300 251.000 457.0 134.551 2.970 -999.990 -999.990 1.346 ..P WKT 2011 02 12 16 39 55 31.3200 -97.3300 251.000 30.0 149.007 3.320 -999.990 -999.990 1.490 ..P WKT 2011 02 12 16 44 55 31.3200 -97.3300 251.000 122.0 148.704 2.960 -999.990 -999.990 1.487 ..P WKT 2011 02 12 16 49 55 31.3200 -97.3300 251.000 457.0 133.311 3.110 -999.990 -999.990 1.333 ..P WKT 2011 02 12 17 04 55 31.3200 -97.3300 251.000 30.0 142.968 3.870 -999.990 -999.990 1.430 ..P WKT 2011 02 12 17 09 55 31.3200 -97.3300 251.000 122.0 148.198 3.050 -999.990 -999.990 1.482 ..P WKT 2011 02 12 17 14 55 31.3200 -97.3300 251.000 457.0 136.177 4.030 -999.990 -999.990 1.362 ..P WKT 2011 02 12 17 19 55 31.3200 -97.3300 251.000 30.0 141.739 3.350 -999.990 -999.990 1.417 ..P WKT 2011 02 12 17 24 55 31.3200 -97.3300 251.000 122.0 145.311 4.730 -999.990 -999.990 1.453 ..P WKT 2011 02 12 17 29 55 31.3200 -97.3300 251.000 457.0 136.275 3.280 -999.990 -999.990 1.363 ..P WKT 2011 02 12 17 39 55 31.3200 -97.3300 251.000 30.0 143.502 3.690 -999.990 -999.990 1.435 ..P WKT 2011 02 12 17 44 55 31.3200 -97.3300 251.000 122.0 148.983 4.600 -999.990 -999.990 1.490 ..P WKT 2011 02 12 17 49 55 31.3200 -97.3300 251.000 457.0 141.356 3.240 -999.990 -999.990 1.414 ..P WKT 2011 02 12 17 54 55 31.3200 -97.3300 251.000 30.0 148.165 3.990 -999.990 -999.990 1.482 ..P WKT 2011 02 12 17 59 55 31.3200 -97.3300 251.000 122.0 143.689 3.290 -999.990 -999.990 1.437 ..P WKT 2011 02 12 18 04 55 31.3200 -97.3300 251.000 457.0 144.690 2.630 -999.990 -999.990 1.447 ..P WKT 2011 02 12 18 14 55 31.3200 -97.3300 251.000 30.0 140.149 3.080 -999.990 -999.990 1.401 ..P WKT 2011 02 12 18 19 55 31.3200 -97.3300 251.000 122.0 141.909 3.800 -999.990 -999.990 1.419 ..P WKT 2011 02 12 18 24 55 31.3200 -97.3300 251.000 457.0 147.320 3.340 -999.990 -999.990 1.473 ..P WKT 2011 02 12 18 29 55 31.3200 -97.3300 251.000 30.0 148.748 5.030 -999.990 -999.990 1.487 ..P WKT 2011 02 12 18 34 55 31.3200 -97.3300 251.000 122.0 142.872 2.900 -999.990 -999.990 1.429 ..P WKT 2011 02 12 18 39 55 31.3200 -97.3300 251.000 457.0 136.332 2.670 -999.990 -999.990 1.363 ..P WKT 2011 02 12 18 49 55 31.3200 -97.3300 251.000 30.0 142.508 2.790 -999.990 -999.990 1.425 ..P WKT 2011 02 12 18 54 55 31.3200 -97.3300 251.000 122.0 144.269 3.940 -999.990 -999.990 1.443 ..P WKT 2011 02 12 18 59 55 31.3200 -97.3300 251.000 457.0 141.048 2.780 -999.990 -999.990 1.410 ..P WKT 2011 02 12 19 04 55 31.3200 -97.3300 251.000 30.0 137.495 2.700 -999.990 -999.990 1.375 ..P WKT 2011 02 12 19 09 55 31.3200 -97.3300 251.000 122.0 147.227 4.460 -999.990 -999.990 1.472 ..P WKT 2011 02 12 19 14 55 31.3200 -97.3300 251.000 457.0 142.013 2.770 -999.990 -999.990 1.420 ..P WKT 2011 02 12 19 24 55 31.3200 -97.3300 251.000 30.0 137.515 2.590 -999.990 -999.990 1.375 ..P WKT 2011 02 12 19 29 55 31.3200 -97.3300 251.000 122.0 143.879 2.890 -999.990 -999.990 1.439 ..P WKT 2011 02 12 19 34 55 31.3200 -97.3300 251.000 457.0 136.956 3.100 -999.990 -999.990 1.370 ..P WKT 2011 02 12 19 39 55 31.3200 -97.3300 251.000 30.0 138.669 3.270 -999.990 -999.990 1.387 ..P WKT 2011 02 12 19 44 55 31.3200 -97.3300 251.000 122.0 136.395 4.260 -999.990 -999.990 1.364 ..P WKT 2011 02 12 19 49 55 31.3200 -97.3300 251.000 457.0 139.106 2.700 -999.990 -999.990 1.391 ..P WKT 2011 02 12 19 59 55 31.3200 -97.3300 251.000 30.0 140.231 3.860 -999.990 -999.990 1.402 ..P WKT 2011 02 12 20 04 55 31.3200 -97.3300 251.000 122.0 141.969 3.290 -999.990 -999.990 1.420 ..P WKT 2011 02 12 20 09 55 31.3200 -97.3300 251.000 457.0 138.722 3.340 -999.990 -999.990 1.387 ..P WKT 2011 02 12 20 14 55 31.3200 -97.3300 251.000 30.0 142.786 3.330 -999.990 -999.990 1.428 ..P WKT 2011 02 12 20 19 55 31.3200 -97.3300 251.000 122.0 140.204 3.780 -999.990 -999.990 1.402 ..P WKT 2011 02 12 20 24 55 31.3200 -97.3300 251.000 457.0 141.277 4.590 -999.990 -999.990 1.413 ..P WKT 2011 02 12 20 34 55 31.3200 -97.3300 251.000 30.0 147.128 4.010 -999.990 -999.990 1.471 ..P WKT 2011 02 12 20 39 55 31.3200 -97.3300 251.000 122.0 142.267 3.910 -999.990 -999.990 1.423 ..P WKT 2011 02 12 20 44 55 31.3200 -97.3300 251.000 457.0 139.232 4.370 -999.990 -999.990 1.392 ..P WKT 2011 02 12 20 49 55 31.3200 -97.3300 251.000 30.0 137.528 3.760 -999.990 -999.990 1.375 ..P WKT 2011 02 12 20 54 55 31.3200 -97.3300 251.000 122.0 143.137 3.340 -999.990 -999.990 1.431 ..P WKT 2011 02 12 20 59 55 31.3200 -97.3300 251.000 457.0 139.105 3.730 -999.990 -999.990 1.391 ..P WKT 2011 02 12 21 09 55 31.3200 -97.3300 251.000 30.0 142.559 4.480 -999.990 -999.990 1.426 ..P WKT 2011 02 12 21 14 55 31.3200 -97.3300 251.000 122.0 137.909 4.960 -999.990 -999.990 1.379 ..P WKT 2011 02 12 21 19 55 31.3200 -97.3300 251.000 457.0 141.406 3.850 -999.990 -999.990 1.414 ..P WKT 2011 02 12 21 24 55 31.3200 -97.3300 251.000 30.0 138.584 3.970 -999.990 -999.990 1.386 ..P WKT 2011 02 12 21 29 55 31.3200 -97.3300 251.000 122.0 145.074 3.270 -999.990 -999.990 1.451 ..P WKT 2011 02 12 21 34 55 31.3200 -97.3300 251.000 457.0 143.084 3.640 -999.990 -999.990 1.431 ..P WKT 2011 02 12 21 44 55 31.3200 -97.3300 251.000 30.0 144.924 5.200 -999.990 -999.990 1.449 ..P WKT 2011 02 12 21 49 55 31.3200 -97.3300 251.000 122.0 143.266 3.220 -999.990 -999.990 1.433 ..P WKT 2011 02 12 21 54 55 31.3200 -97.3300 251.000 457.0 143.603 3.260 -999.990 -999.990 1.436 ..P WKT 2011 02 12 21 59 55 31.3200 -97.3300 251.000 30.0 148.433 3.480 -999.990 -999.990 1.484 ..P WKT 2011 02 12 22 04 55 31.3200 -97.3300 251.000 122.0 136.961 3.560 -999.990 -999.990 1.370 ..P WKT 2011 02 12 22 09 55 31.3200 -97.3300 251.000 457.0 137.465 3.030 -999.990 -999.990 1.375 ..P WKT 2011 02 12 22 19 55 31.3200 -97.3300 251.000 30.0 141.444 3.660 -999.990 -999.990 1.414 ..P WKT 2011 02 12 22 24 55 31.3200 -97.3300 251.000 122.0 142.589 2.920 -999.990 -999.990 1.426 ..P WKT 2011 02 12 22 29 55 31.3200 -97.3300 251.000 457.0 143.735 3.900 -999.990 -999.990 1.437 ..P WKT 2011 02 12 22 34 55 31.3200 -97.3300 251.000 30.0 141.554 4.260 -999.990 -999.990 1.416 ..P WKT 2011 02 12 22 39 55 31.3200 -97.3300 251.000 122.0 139.372 3.880 -999.990 -999.990 1.394 ..P WKT 2011 02 12 22 44 55 31.3200 -97.3300 251.000 457.0 140.185 3.230 -999.990 -999.990 1.402 ..P WKT 2011 02 12 22 54 55 31.3200 -97.3300 251.000 30.0 142.097 4.400 -999.990 -999.990 1.421 ..P WKT 2011 02 12 22 59 55 31.3200 -97.3300 251.000 122.0 139.202 4.210 -999.990 -999.990 1.392 ..P WKT 2011 02 12 23 04 55 31.3200 -97.3300 251.000 457.0 144.295 4.860 -999.990 -999.990 1.443 ..P WKT 2011 02 12 23 09 55 31.3200 -97.3300 251.000 30.0 145.728 4.920 -999.990 -999.990 1.457 ..P WKT 2011 02 12 23 14 55 31.3200 -97.3300 251.000 122.0 143.497 2.950 -999.990 -999.990 1.435 ..P WKT 2011 02 12 23 19 55 31.3200 -97.3300 251.000 457.0 146.927 3.560 -999.990 -999.990 1.469 ..P WKT 2011 02 12 23 29 55 31.3200 -97.3300 251.000 30.0 147.803 2.680 -999.990 -999.990 1.478 ..P WKT 2011 02 12 23 34 55 31.3200 -97.3300 251.000 122.0 148.578 3.210 -999.990 -999.990 1.486 ..P WKT 2011 02 12 23 39 55 31.3200 -97.3300 251.000 457.0 144.692 4.240 -999.990 -999.990 1.447 ..P WKT 2011 02 12 23 44 55 31.3200 -97.3300 251.000 30.0 147.798 4.880 -999.990 -999.990 1.478 ..P WKT 2011 02 12 23 49 55 31.3200 -97.3300 251.000 122.0 156.233 3.280 -999.990 -999.990 1.562 ..P WKT 2011 02 13 00 09 55 31.3200 -97.3300 251.000 457.0 163.180 3.920 -999.990 -999.990 1.632 ..P WKT 2011 02 13 00 10 25 31.3200 -97.3300 251.000 457.0 165.939 3.490 -999.990 -999.990 1.659 ..P WKT 2011 02 13 00 10 55 31.3200 -97.3300 251.000 457.0 166.868 4.060 -999.990 -999.990 1.669 ..P WKT 2011 02 13 00 11 25 31.3200 -97.3300 251.000 457.0 163.301 4.140 -999.990 -999.990 1.633 ..P WKT 2011 02 13 00 11 55 31.3200 -97.3300 251.000 457.0 168.058 3.480 -999.990 -999.990 1.681 ..P WKT 2011 02 13 00 12 25 31.3200 -97.3300 251.000 457.0 167.322 3.480 -999.990 -999.990 1.673 ..P WKT 2011 02 13 00 12 55 31.3200 -97.3300 251.000 457.0 171.913 4.070 -999.990 -999.990 1.719 ..P WKT 2011 02 13 00 13 25 31.3200 -97.3300 251.000 457.0 173.341 3.660 -999.990 -999.990 1.733 ..P WKT 2011 02 13 00 13 55 31.3200 -97.3300 251.000 457.0 171.772 3.640 -999.990 -999.990 1.718 ..P WKT 2011 02 13 00 14 25 31.3200 -97.3300 251.000 457.0 169.371 4.110 -999.990 -999.990 1.694 ..P WKT 2011 02 13 00 14 55 31.3200 -97.3300 251.000 457.0 163.973 4.470 -999.990 -999.990 1.640 ..P WKT 2011 02 13 00 19 55 31.3200 -97.3300 251.000 30.0 170.925 3.720 -999.990 -999.990 1.709 ..P WKT 2011 02 13 00 24 55 31.3200 -97.3300 251.000 122.0 165.059 3.520 -999.990 -999.990 1.651 ..P WKT 2011 02 13 00 29 55 31.3200 -97.3300 251.000 457.0 164.853 4.720 -999.990 -999.990 1.649 ..P WKT 2011 02 13 00 34 55 31.3200 -97.3300 251.000 30.0 171.804 4.420 -999.990 -999.990 1.718 ..P WKT 2011 02 13 00 39 55 31.3200 -97.3300 251.000 122.0 172.431 4.230 -999.990 -999.990 1.724 ..P WKT 2011 02 13 00 44 55 31.3200 -97.3300 251.000 457.0 176.052 3.720 -999.990 -999.990 1.761 ..P WKT 2011 02 13 00 54 55 31.3200 -97.3300 251.000 30.0 159.582 3.380 -999.990 -999.990 1.596 ..P WKT 2011 02 13 00 59 55 31.3200 -97.3300 251.000 122.0 148.978 4.370 -999.990 -999.990 1.490 ..P WKT 2011 02 13 01 04 55 31.3200 -97.3300 251.000 457.0 158.840 3.630 -999.990 -999.990 1.588 ..P WKT 2011 02 13 01 09 55 31.3200 -97.3300 251.000 30.0 155.393 3.270 -999.990 -999.990 1.554 ..P WKT 2011 02 13 01 14 55 31.3200 -97.3300 251.000 122.0 153.608 3.430 -999.990 -999.990 1.536 ..P WKT 2011 02 13 01 19 55 31.3200 -97.3300 251.000 457.0 159.642 3.210 -999.990 -999.990 1.596 ..P WKT 2011 02 13 01 29 55 31.3200 -97.3300 251.000 30.0 151.653 3.870 -999.990 -999.990 1.517 ..P WKT 2011 02 13 01 34 55 31.3200 -97.3300 251.000 122.0 153.434 2.830 -999.990 -999.990 1.534 ..P WKT 2011 02 13 01 39 55 31.3200 -97.3300 251.000 457.0 155.381 3.050 -999.990 -999.990 1.554 ..P WKT 2011 02 13 01 44 55 31.3200 -97.3300 251.000 30.0 163.147 2.960 -999.990 -999.990 1.631 ..P WKT 2011 02 13 01 49 55 31.3200 -97.3300 251.000 122.0 150.126 4.040 -999.990 -999.990 1.501 ..P WKT 2011 02 13 01 54 55 31.3200 -97.3300 251.000 457.0 156.230 2.780 -999.990 -999.990 1.562 ..P WKT 2011 02 13 02 04 55 31.3200 -97.3300 251.000 30.0 168.315 2.870 -999.990 -999.990 1.683 ..P WKT 2011 02 13 02 09 55 31.3200 -97.3300 251.000 122.0 152.685 3.060 -999.990 -999.990 1.527 ..P WKT 2011 02 13 02 14 55 31.3200 -97.3300 251.000 457.0 161.661 3.350 -999.990 -999.990 1.617 ..P WKT 2011 02 13 02 19 55 31.3200 -97.3300 251.000 30.0 172.297 4.030 -999.990 -999.990 1.723 ..P WKT 2011 02 13 02 24 55 31.3200 -97.3300 251.000 122.0 146.031 4.090 -999.990 -999.990 1.460 ..P WKT 2011 02 13 02 29 55 31.3200 -97.3300 251.000 457.0 159.327 3.110 -999.990 -999.990 1.593 ..P WKT 2011 02 13 02 39 55 31.3200 -97.3300 251.000 30.0 170.481 2.690 -999.990 -999.990 1.705 ..P WKT 2011 02 13 02 44 55 31.3200 -97.3300 251.000 122.0 160.033 4.050 -999.990 -999.990 1.600 ..P WKT 2011 02 13 02 49 55 31.3200 -97.3300 251.000 457.0 157.894 3.410 -999.990 -999.990 1.579 ..P WKT 2011 02 13 02 54 55 31.3200 -97.3300 251.000 30.0 168.384 4.850 -999.990 -999.990 1.684 ..P WKT 2011 02 13 02 59 55 31.3200 -97.3300 251.000 122.0 167.906 4.090 -999.990 -999.990 1.679 ..P WKT 2011 02 13 03 04 55 31.3200 -97.3300 251.000 457.0 178.726 4.310 -999.990 -999.990 1.787 ..P WKT 2011 02 13 03 14 55 31.3200 -97.3300 251.000 30.0 170.889 4.520 -999.990 -999.990 1.709 ..P WKT 2011 02 13 03 19 55 31.3200 -97.3300 251.000 122.0 171.834 4.010 -999.990 -999.990 1.718 ..P WKT 2011 02 13 03 24 55 31.3200 -97.3300 251.000 457.0 176.435 5.310 -999.990 -999.990 1.764 ..P WKT 2011 02 13 03 29 55 31.3200 -97.3300 251.000 30.0 193.658 5.260 -999.990 -999.990 1.937 ..P WKT 2011 02 13 03 34 55 31.3200 -97.3300 251.000 122.0 306.541 5.390 -999.990 -999.990 3.065 ..P WKT 2011 02 13 03 39 55 31.3200 -97.3300 251.000 457.0 174.290 4.190 -999.990 -999.990 1.743 ..P WKT 2011 02 13 03 49 55 31.3200 -97.3300 251.000 30.0 209.558 3.560 -999.990 -999.990 2.096 ..P WKT 2011 02 13 03 54 55 31.3200 -97.3300 251.000 122.0 193.565 4.920 -999.990 -999.990 1.936 ..P WKT 2011 02 13 03 59 55 31.3200 -97.3300 251.000 457.0 171.763 5.150 -999.990 -999.990 1.718 ..P WKT 2011 02 13 04 04 55 31.3200 -97.3300 251.000 30.0 210.562 4.840 -999.990 -999.990 2.106 ..P WKT 2011 02 13 04 09 55 31.3200 -97.3300 251.000 122.0 199.221 3.160 -999.990 -999.990 1.992 ..P WKT 2011 02 13 04 14 55 31.3200 -97.3300 251.000 457.0 170.285 3.050 -999.990 -999.990 1.703 ..P WKT 2011 02 13 04 24 55 31.3200 -97.3300 251.000 30.0 220.950 3.010 -999.990 -999.990 2.209 ..P WKT 2011 02 13 04 29 55 31.3200 -97.3300 251.000 122.0 173.572 4.320 -999.990 -999.990 1.736 ..P WKT 2011 02 13 04 34 55 31.3200 -97.3300 251.000 457.0 168.851 3.240 -999.990 -999.990 1.689 ..P WKT 2011 02 13 04 39 55 31.3200 -97.3300 251.000 30.0 223.540 3.540 -999.990 -999.990 2.235 ..P WKT 2011 02 13 04 44 55 31.3200 -97.3300 251.000 122.0 194.092 3.030 -999.990 -999.990 1.941 ..P WKT 2011 02 13 04 49 55 31.3200 -97.3300 251.000 457.0 169.293 3.570 -999.990 -999.990 1.693 ..P WKT 2011 02 13 05 04 55 31.3200 -97.3300 251.000 30.0 208.905 3.740 -999.990 -999.990 2.089 ..P WKT 2011 02 13 05 09 55 31.3200 -97.3300 251.000 122.0 172.674 3.900 -999.990 -999.990 1.727 ..P WKT 2011 02 13 05 14 55 31.3200 -97.3300 251.000 457.0 165.642 3.240 -999.990 -999.990 1.656 ..P WKT 2011 02 13 05 19 55 31.3200 -97.3300 251.000 30.0 198.916 3.930 -999.990 -999.990 1.989 ..P WKT 2011 02 13 05 24 55 31.3200 -97.3300 251.000 122.0 174.469 2.930 -999.990 -999.990 1.745 ..P WKT 2011 02 13 05 29 55 31.3200 -97.3300 251.000 457.0 163.126 3.060 -999.990 -999.990 1.631 ..P WKT 2011 02 13 05 39 55 31.3200 -97.3300 251.000 30.0 209.159 3.610 -999.990 -999.990 2.092 ..P WKT 2011 02 13 05 44 55 31.3200 -97.3300 251.000 122.0 159.243 4.310 -999.990 -999.990 1.592 ..P WKT 2011 02 13 05 49 55 31.3200 -97.3300 251.000 457.0 163.220 3.400 -999.990 -999.990 1.632 ..P WKT 2011 02 13 05 54 55 31.3200 -97.3300 251.000 30.0 222.904 4.830 -999.990 -999.990 2.229 ..P WKT 2011 02 13 05 59 55 31.3200 -97.3300 251.000 122.0 174.489 3.770 -999.990 -999.990 1.745 ..P WKT 2011 02 13 06 04 55 31.3200 -97.3300 251.000 457.0 158.903 3.940 -999.990 -999.990 1.589 ..P WKT 2011 02 13 06 14 55 31.3200 -97.3300 251.000 30.0 221.081 3.820 -999.990 -999.990 2.211 ..P WKT 2011 02 13 06 19 55 31.3200 -97.3300 251.000 122.0 171.209 3.460 -999.990 -999.990 1.712 ..P WKT 2011 02 13 06 24 55 31.3200 -97.3300 251.000 457.0 152.170 3.630 -999.990 -999.990 1.522 ..P WKT 2011 02 13 06 29 55 31.3200 -97.3300 251.000 30.0 215.333 3.710 -999.990 -999.990 2.153 ..P WKT 2011 02 13 06 34 55 31.3200 -97.3300 251.000 122.0 162.820 3.530 -999.990 -999.990 1.628 ..P WKT 2011 02 13 06 39 55 31.3200 -97.3300 251.000 457.0 153.727 3.170 -999.990 -999.990 1.537 ..P WKT 2011 02 13 06 49 55 31.3200 -97.3300 251.000 30.0 200.541 3.520 -999.990 -999.990 2.005 ..P WKT 2011 02 13 06 54 55 31.3200 -97.3300 251.000 122.0 156.372 3.430 -999.990 -999.990 1.564 ..P WKT 2011 02 13 06 59 55 31.3200 -97.3300 251.000 457.0 154.950 3.980 -999.990 -999.990 1.549 ..P WKT 2011 02 13 07 04 55 31.3200 -97.3300 251.000 30.0 191.960 4.600 -999.990 -999.990 1.920 ..P WKT 2011 02 13 07 09 55 31.3200 -97.3300 251.000 122.0 165.027 4.500 -999.990 -999.990 1.650 ..P WKT 2011 02 13 07 14 55 31.3200 -97.3300 251.000 457.0 146.379 4.760 -999.990 -999.990 1.464 ..P WKT 2011 02 13 07 24 55 31.3200 -97.3300 251.000 30.0 174.933 4.480 -999.990 -999.990 1.749 ..P WKT 2011 02 13 07 29 55 31.3200 -97.3300 251.000 122.0 152.242 5.170 -999.990 -999.990 1.522 ..P WKT 2011 02 13 07 34 55 31.3200 -97.3300 251.000 457.0 151.412 4.560 -999.990 -999.990 1.514 ..P WKT 2011 02 13 07 39 55 31.3200 -97.3300 251.000 30.0 192.310 6.030 -999.990 -999.990 1.923 ..P WKT 2011 02 13 07 44 55 31.3200 -97.3300 251.000 122.0 161.675 4.290 -999.990 -999.990 1.617 ..P WKT 2011 02 13 07 49 55 31.3200 -97.3300 251.000 457.0 148.262 4.460 -999.990 -999.990 1.483 ..P WKT 2011 02 13 07 59 55 31.3200 -97.3300 251.000 30.0 188.439 5.270 -999.990 -999.990 1.884 ..P WKT 2011 02 13 08 04 55 31.3200 -97.3300 251.000 122.0 155.612 3.890 -999.990 -999.990 1.556 ..P WKT 2011 02 13 08 09 55 31.3200 -97.3300 251.000 457.0 147.453 4.070 -999.990 -999.990 1.475 ..P WKT 2011 02 13 08 14 55 31.3200 -97.3300 251.000 30.0 183.154 3.950 -999.990 -999.990 1.832 ..P WKT 2011 02 13 08 19 55 31.3200 -97.3300 251.000 122.0 156.954 3.170 -999.990 -999.990 1.570 ..P WKT 2011 02 13 08 24 55 31.3200 -97.3300 251.000 457.0 144.989 3.510 -999.990 -999.990 1.450 ..P WKT 2011 02 13 08 34 55 31.3200 -97.3300 251.000 30.0 190.728 2.830 -999.990 -999.990 1.907 ..P WKT 2011 02 13 08 39 55 31.3200 -97.3300 251.000 122.0 163.707 2.860 -999.990 -999.990 1.637 ..P WKT 2011 02 13 08 44 55 31.3200 -97.3300 251.000 457.0 144.796 2.510 -999.990 -999.990 1.448 ..P WKT 2011 02 13 08 49 55 31.3200 -97.3300 251.000 30.0 195.868 3.060 -999.990 -999.990 1.959 ..P WKT 2011 02 13 08 54 55 31.3200 -97.3300 251.000 122.0 173.483 4.600 -999.990 -999.990 1.735 ..P WKT 2011 02 13 08 59 55 31.3200 -97.3300 251.000 457.0 144.484 3.200 -999.990 -999.990 1.445 ..P WKT 2011 02 13 09 09 55 31.3200 -97.3300 251.000 30.0 251.283 2.950 -999.990 -999.990 2.513 ..P WKT 2011 02 13 09 14 55 31.3200 -97.3300 251.000 122.0 174.203 3.250 -999.990 -999.990 1.742 ..P WKT 2011 02 13 09 19 55 31.3200 -97.3300 251.000 457.0 148.566 2.920 -999.990 -999.990 1.486 ..P WKT 2011 02 13 09 24 55 31.3200 -97.3300 251.000 30.0 246.463 3.960 -999.990 -999.990 2.465 ..P WKT 2011 02 13 09 29 55 31.3200 -97.3300 251.000 122.0 167.249 2.900 -999.990 -999.990 1.672 ..P WKT 2011 02 13 09 34 55 31.3200 -97.3300 251.000 457.0 138.641 3.310 -999.990 -999.990 1.386 ..P WKT 2011 02 13 09 44 55 31.3200 -97.3300 251.000 30.0 229.145 2.880 -999.990 -999.990 2.291 ..P WKT 2011 02 13 09 49 55 31.3200 -97.3300 251.000 122.0 171.678 3.480 -999.990 -999.990 1.717 ..P WKT 2011 02 13 09 54 55 31.3200 -97.3300 251.000 457.0 144.636 4.680 -999.990 -999.990 1.446 ..P WKT 2011 02 13 09 59 55 31.3200 -97.3300 251.000 30.0 234.958 4.660 -999.990 -999.990 2.350 ..P WKT 2011 02 13 10 04 55 31.3200 -97.3300 251.000 122.0 183.122 3.870 -999.990 -999.990 1.831 ..P WKT 2011 02 13 10 09 55 31.3200 -97.3300 251.000 457.0 143.853 2.580 -999.990 -999.990 1.439 ..P WKT 2011 02 13 10 19 55 31.3200 -97.3300 251.000 30.0 232.358 4.900 -999.990 -999.990 2.324 ..P WKT 2011 02 13 10 24 55 31.3200 -97.3300 251.000 122.0 184.949 4.240 -999.990 -999.990 1.849 ..P WKT 2011 02 13 10 29 55 31.3200 -97.3300 251.000 457.0 145.147 4.680 -999.990 -999.990 1.451 ..P WKT 2011 02 13 10 34 55 31.3200 -97.3300 251.000 30.0 222.991 4.330 -999.990 -999.990 2.230 ..P WKT 2011 02 13 10 39 55 31.3200 -97.3300 251.000 122.0 185.504 3.530 -999.990 -999.990 1.855 ..P WKT 2011 02 13 10 44 55 31.3200 -97.3300 251.000 457.0 140.753 2.690 -999.990 -999.990 1.408 ..P WKT 2011 02 13 10 54 55 31.3200 -97.3300 251.000 30.0 213.810 3.990 -999.990 -999.990 2.138 ..P WKT 2011 02 13 10 59 55 31.3200 -97.3300 251.000 122.0 196.155 3.390 -999.990 -999.990 1.962 ..P WKT 2011 02 13 11 04 55 31.3200 -97.3300 251.000 457.0 136.549 3.770 -999.990 -999.990 1.365 ..P WKT 2011 02 13 11 09 55 31.3200 -97.3300 251.000 30.0 210.067 3.590 -999.990 -999.990 2.101 ..P WKT 2011 02 13 11 14 55 31.3200 -97.3300 251.000 122.0 195.717 2.620 -999.990 -999.990 1.957 ..P WKT 2011 02 13 11 19 55 31.3200 -97.3300 251.000 457.0 137.113 2.920 -999.990 -999.990 1.371 ..P WKT 2011 02 13 11 29 55 31.3200 -97.3300 251.000 30.0 201.117 3.230 -999.990 -999.990 2.011 ..P WKT 2011 02 13 11 34 55 31.3200 -97.3300 251.000 122.0 183.364 3.560 -999.990 -999.990 1.834 ..P WKT 2011 02 13 11 39 55 31.3200 -97.3300 251.000 457.0 140.848 3.860 -999.990 -999.990 1.408 ..P WKT 2011 02 13 11 44 55 31.3200 -97.3300 251.000 30.0 201.846 3.520 -999.990 -999.990 2.018 ..P WKT 2011 02 13 11 49 55 31.3200 -97.3300 251.000 122.0 185.581 3.810 -999.990 -999.990 1.856 ..P WKT 2011 02 13 12 09 55 31.3200 -97.3300 251.000 457.0 131.212 3.290 -999.990 -999.990 1.312 ..P WKT 2011 02 13 12 10 25 31.3200 -97.3300 251.000 457.0 135.391 3.620 -999.990 -999.990 1.354 ..P WKT 2011 02 13 12 10 55 31.3200 -97.3300 251.000 457.0 136.600 3.230 -999.990 -999.990 1.366 ..P WKT 2011 02 13 12 11 25 31.3200 -97.3300 251.000 457.0 131.866 4.350 -999.990 -999.990 1.319 ..P WKT 2011 02 13 12 11 55 31.3200 -97.3300 251.000 457.0 132.249 3.240 -999.990 -999.990 1.322 ..P WKT 2011 02 13 12 12 25 31.3200 -97.3300 251.000 457.0 136.925 3.090 -999.990 -999.990 1.369 ..P WKT 2011 02 13 12 12 55 31.3200 -97.3300 251.000 457.0 134.832 3.160 -999.990 -999.990 1.348 ..P WKT 2011 02 13 12 13 25 31.3200 -97.3300 251.000 457.0 137.361 3.820 -999.990 -999.990 1.374 ..P WKT 2011 02 13 12 13 55 31.3200 -97.3300 251.000 457.0 132.462 3.580 -999.990 -999.990 1.325 ..P WKT 2011 02 13 12 14 25 31.3200 -97.3300 251.000 457.0 136.807 2.810 -999.990 -999.990 1.368 ..P WKT 2011 02 13 12 14 55 31.3200 -97.3300 251.000 457.0 138.511 3.260 -999.990 -999.990 1.385 ..P WKT 2011 02 13 12 19 55 31.3200 -97.3300 251.000 30.0 198.810 3.250 -999.990 -999.990 1.988 ..P WKT 2011 02 13 12 24 55 31.3200 -97.3300 251.000 122.0 185.807 3.590 -999.990 -999.990 1.858 ..P WKT 2011 02 13 12 29 55 31.3200 -97.3300 251.000 457.0 134.326 3.310 -999.990 -999.990 1.343 ..P WKT 2011 02 13 12 34 55 31.3200 -97.3300 251.000 30.0 196.453 3.450 -999.990 -999.990 1.965 ..P WKT 2011 02 13 12 39 55 31.3200 -97.3300 251.000 122.0 188.071 3.840 -999.990 -999.990 1.881 ..P WKT 2011 02 13 12 44 55 31.3200 -97.3300 251.000 457.0 141.039 3.490 -999.990 -999.990 1.410 ..P WKT 2011 02 13 12 54 55 31.3200 -97.3300 251.000 30.0 201.131 3.020 -999.990 -999.990 2.011 ..P WKT 2011 02 13 12 59 55 31.3200 -97.3300 251.000 122.0 189.500 4.450 -999.990 -999.990 1.895 ..P WKT 2011 02 13 13 04 55 31.3200 -97.3300 251.000 457.0 140.036 2.430 -999.990 -999.990 1.400 ..P WKT 2011 02 13 13 09 55 31.3200 -97.3300 251.000 30.0 199.112 3.400 -999.990 -999.990 1.991 ..P WKT 2011 02 13 13 14 55 31.3200 -97.3300 251.000 122.0 197.558 2.700 -999.990 -999.990 1.976 ..P WKT 2011 02 13 13 19 55 31.3200 -97.3300 251.000 457.0 140.151 2.920 -999.990 -999.990 1.402 ..P WKT 2011 02 13 13 29 55 31.3200 -97.3300 251.000 30.0 197.473 2.550 -999.990 -999.990 1.975 ..P WKT 2011 02 13 13 34 55 31.3200 -97.3300 251.000 122.0 189.259 3.260 -999.990 -999.990 1.893 ..P WKT 2011 02 13 13 39 55 31.3200 -97.3300 251.000 457.0 136.748 2.800 -999.990 -999.990 1.367 ..P WKT 2011 02 13 13 44 55 31.3200 -97.3300 251.000 30.0 202.584 2.770 -999.990 -999.990 2.026 ..P WKT 2011 02 13 13 49 55 31.3200 -97.3300 251.000 122.0 185.111 4.490 -999.990 -999.990 1.851 ..P WKT 2011 02 13 13 54 55 31.3200 -97.3300 251.000 457.0 135.565 2.660 -999.990 -999.990 1.356 ..P WKT 2011 02 13 14 04 55 31.3200 -97.3300 251.000 30.0 202.409 3.200 -999.990 -999.990 2.024 ..P WKT 2011 02 13 14 09 55 31.3200 -97.3300 251.000 122.0 180.585 2.690 -999.990 -999.990 1.806 ..P WKT 2011 02 13 14 14 55 31.3200 -97.3300 251.000 457.0 138.585 2.870 -999.990 -999.990 1.386 ..P WKT 2011 02 13 14 19 55 31.3200 -97.3300 251.000 30.0 201.097 4.080 -999.990 -999.990 2.011 ..P WKT 2011 02 13 14 24 55 31.3200 -97.3300 251.000 122.0 179.269 3.370 -999.990 -999.990 1.793 ..P WKT 2011 02 13 14 29 55 31.3200 -97.3300 251.000 457.0 130.974 2.520 -999.990 -999.990 1.310 ..P WKT 2011 02 13 14 39 55 31.3200 -97.3300 251.000 30.0 202.104 3.470 -999.990 -999.990 2.021 ..P WKT 2011 02 13 14 44 55 31.3200 -97.3300 251.000 122.0 179.277 4.710 -999.990 -999.990 1.793 ..P WKT 2011 02 13 14 49 55 31.3200 -97.3300 251.000 457.0 126.998 4.840 -999.990 -999.990 1.270 ..P WKT 2011 02 13 14 54 55 31.3200 -97.3300 251.000 30.0 191.525 5.010 -999.990 -999.990 1.915 ..P WKT 2011 02 13 14 59 55 31.3200 -97.3300 251.000 122.0 170.017 4.530 -999.990 -999.990 1.700 ..P WKT 2011 02 13 15 04 55 31.3200 -97.3300 251.000 457.0 122.691 3.560 -999.990 -999.990 1.227 ..P WKT 2011 02 13 15 14 55 31.3200 -97.3300 251.000 30.0 175.152 3.540 -999.990 -999.990 1.752 ..P WKT 2011 02 13 15 19 55 31.3200 -97.3300 251.000 122.0 175.650 4.440 -999.990 -999.990 1.757 ..P WKT 2011 02 13 15 24 55 31.3200 -97.3300 251.000 457.0 122.849 5.020 -999.990 -999.990 1.228 ..P WKT 2011 02 13 15 29 55 31.3200 -97.3300 251.000 30.0 179.627 4.010 -999.990 -999.990 1.796 ..P WKT 2011 02 13 15 34 55 31.3200 -97.3300 251.000 122.0 177.808 4.590 -999.990 -999.990 1.778 ..P WKT 2011 02 13 15 39 55 31.3200 -97.3300 251.000 457.0 128.804 2.510 -999.990 -999.990 1.288 ..P WKT 2011 02 13 15 49 55 31.3200 -97.3300 251.000 30.0 180.416 3.160 -999.990 -999.990 1.804 ..P WKT 2011 02 13 15 54 55 31.3200 -97.3300 251.000 122.0 188.981 3.130 -999.990 -999.990 1.890 ..P WKT 2011 02 13 15 59 55 31.3200 -97.3300 251.000 457.0 130.313 3.180 -999.990 -999.990 1.303 ..P WKT 2011 02 13 16 04 55 31.3200 -97.3300 251.000 30.0 189.555 2.740 -999.990 -999.990 1.896 ..P WKT 2011 02 13 16 09 55 31.3200 -97.3300 251.000 122.0 178.248 2.960 -999.990 -999.990 1.782 ..P WKT 2011 02 13 16 14 55 31.3200 -97.3300 251.000 457.0 128.676 3.180 -999.990 -999.990 1.287 ..P WKT 2011 02 13 16 24 55 31.3200 -97.3300 251.000 30.0 184.691 3.150 -999.990 -999.990 1.847 ..P WKT 2011 02 13 16 29 55 31.3200 -97.3300 251.000 122.0 175.486 3.920 -999.990 -999.990 1.755 ..P WKT 2011 02 13 16 34 55 31.3200 -97.3300 251.000 457.0 133.641 2.930 -999.990 -999.990 1.336 ..P WKT 2011 02 13 16 39 55 31.3200 -97.3300 251.000 30.0 183.088 2.780 -999.990 -999.990 1.831 ..P WKT 2011 02 13 16 44 55 31.3200 -97.3300 251.000 122.0 178.853 5.860 -999.990 -999.990 1.789 ..P WKT 2011 02 13 16 49 55 31.3200 -97.3300 251.000 457.0 127.387 2.570 -999.990 -999.990 1.274 ..P WKT 2011 02 13 17 04 55 31.3200 -97.3300 251.000 30.0 167.359 3.890 -999.990 -999.990 1.674 ..P WKT 2011 02 13 17 09 55 31.3200 -97.3300 251.000 122.0 165.516 3.490 -999.990 -999.990 1.655 ..P WKT 2011 02 13 17 14 55 31.3200 -97.3300 251.000 457.0 139.802 4.520 -999.990 -999.990 1.398 ..P WKT 2011 02 13 17 19 55 31.3200 -97.3300 251.000 30.0 154.866 3.850 -999.990 -999.990 1.549 ..P WKT 2011 02 13 17 24 55 31.3200 -97.3300 251.000 122.0 156.173 3.410 -999.990 -999.990 1.562 ..P WKT 2011 02 13 17 29 55 31.3200 -97.3300 251.000 457.0 153.333 2.890 -999.990 -999.990 1.533 ..P WKT 2011 02 13 17 39 55 31.3200 -97.3300 251.000 30.0 152.673 2.750 -999.990 -999.990 1.527 ..P WKT 2011 02 13 17 44 55 31.3200 -97.3300 251.000 122.0 154.190 3.760 -999.990 -999.990 1.542 ..P WKT 2011 02 13 17 49 55 31.3200 -97.3300 251.000 457.0 148.077 4.690 -999.990 -999.990 1.481 ..P WKT 2011 02 13 17 54 55 31.3200 -97.3300 251.000 30.0 152.580 3.440 -999.990 -999.990 1.526 ..P WKT 2011 02 13 17 59 55 31.3200 -97.3300 251.000 122.0 150.447 3.110 -999.990 -999.990 1.504 ..P WKT 2011 02 13 18 04 55 31.3200 -97.3300 251.000 457.0 150.305 2.810 -999.990 -999.990 1.503 ..P WKT 2011 02 13 18 14 55 31.3200 -97.3300 251.000 30.0 149.215 3.000 -999.990 -999.990 1.492 ..P WKT 2011 02 13 18 19 55 31.3200 -97.3300 251.000 122.0 150.921 3.030 -999.990 -999.990 1.509 ..P WKT 2011 02 13 18 24 55 31.3200 -97.3300 251.000 457.0 152.628 3.220 -999.990 -999.990 1.526 ..P WKT 2011 02 13 18 29 55 31.3200 -97.3300 251.000 30.0 151.348 2.920 -999.990 -999.990 1.513 ..P WKT 2011 02 13 18 34 55 31.3200 -97.3300 251.000 122.0 149.072 4.080 -999.990 -999.990 1.491 ..P WKT 2011 02 13 18 39 55 31.3200 -97.3300 251.000 457.0 155.427 3.140 -999.990 -999.990 1.554 ..P WKT 2011 02 13 18 49 55 31.3200 -97.3300 251.000 30.0 158.652 3.340 -999.990 -999.990 1.587 ..P WKT 2011 02 13 18 54 55 31.3200 -97.3300 251.000 122.0 153.530 3.500 -999.990 -999.990 1.535 ..P WKT 2011 02 13 18 59 55 31.3200 -97.3300 251.000 457.0 165.341 4.240 -999.990 -999.990 1.653 ..P WKT 2011 02 13 19 04 55 31.3200 -97.3300 251.000 30.0 153.246 4.370 -999.990 -999.990 1.532 ..P WKT 2011 02 13 19 09 55 31.3200 -97.3300 251.000 122.0 163.398 4.390 -999.990 -999.990 1.634 ..P WKT 2011 02 13 19 14 55 31.3200 -97.3300 251.000 457.0 147.981 4.730 -999.990 -999.990 1.480 ..P WKT 2011 02 13 19 24 55 31.3200 -97.3300 251.000 30.0 159.629 7.170 -999.990 -999.990 1.596 ..P WKT 2011 02 13 19 29 55 31.3200 -97.3300 251.000 122.0 158.799 3.810 -999.990 -999.990 1.588 ..P WKT 2011 02 13 19 34 55 31.3200 -97.3300 251.000 457.0 157.472 4.370 -999.990 -999.990 1.575 ..P WKT 2011 02 13 19 39 55 31.3200 -97.3300 251.000 30.0 166.441 3.680 -999.990 -999.990 1.664 ..P WKT 2011 02 13 19 44 55 31.3200 -97.3300 251.000 122.0 162.788 3.350 -999.990 -999.990 1.628 ..P WKT 2011 02 13 19 49 55 31.3200 -97.3300 251.000 457.0 162.458 2.850 -999.990 -999.990 1.625 ..P WKT 2011 02 13 19 59 55 31.3200 -97.3300 251.000 30.0 152.419 2.740 -999.990 -999.990 1.524 ..P WKT 2011 02 13 20 04 55 31.3200 -97.3300 251.000 122.0 158.994 3.160 -999.990 -999.990 1.590 ..P WKT 2011 02 13 20 09 55 31.3200 -97.3300 251.000 457.0 152.609 3.460 -999.990 -999.990 1.526 ..P WKT 2011 02 13 20 14 55 31.3200 -97.3300 251.000 30.0 155.862 4.850 -999.990 -999.990 1.559 ..P WKT 2011 02 13 20 19 55 31.3200 -97.3300 251.000 122.0 156.955 3.570 -999.990 -999.990 1.570 ..P WKT 2011 02 13 20 24 55 31.3200 -97.3300 251.000 457.0 152.063 2.910 -999.990 -999.990 1.521 ..P WKT 2011 02 13 20 34 55 31.3200 -97.3300 251.000 30.0 151.779 3.040 -999.990 -999.990 1.518 ..P WKT 2011 02 13 20 39 55 31.3200 -97.3300 251.000 122.0 149.737 5.130 -999.990 -999.990 1.497 ..P WKT 2011 02 13 20 44 55 31.3200 -97.3300 251.000 457.0 150.188 4.040 -999.990 -999.990 1.502 ..P WKT 2011 02 13 20 49 55 31.3200 -97.3300 251.000 30.0 154.630 5.150 -999.990 -999.990 1.546 ..P WKT 2011 02 13 20 54 55 31.3200 -97.3300 251.000 122.0 149.428 4.150 -999.990 -999.990 1.494 ..P WKT 2011 02 13 20 59 55 31.3200 -97.3300 251.000 457.0 157.694 3.780 -999.990 -999.990 1.577 ..P WKT 2011 02 13 21 09 55 31.3200 -97.3300 251.000 30.0 149.024 4.690 -999.990 -999.990 1.490 ..P WKT 2011 02 13 21 14 55 31.3200 -97.3300 251.000 122.0 156.199 3.570 -999.990 -999.990 1.562 ..P WKT 2011 02 13 21 19 55 31.3200 -97.3300 251.000 457.0 152.231 4.010 -999.990 -999.990 1.522 ..P WKT 2011 02 13 21 24 55 31.3200 -97.3300 251.000 30.0 152.089 3.330 -999.990 -999.990 1.521 ..P WKT 2011 02 13 21 29 55 31.3200 -97.3300 251.000 122.0 153.611 2.950 -999.990 -999.990 1.536 ..P WKT 2011 02 13 21 34 55 31.3200 -97.3300 251.000 457.0 154.466 2.900 -999.990 -999.990 1.545 ..P WKT 2011 02 13 21 44 55 31.3200 -97.3300 251.000 30.0 154.681 3.130 -999.990 -999.990 1.547 ..P WKT 2011 02 13 21 49 55 31.3200 -97.3300 251.000 122.0 158.865 3.180 -999.990 -999.990 1.589 ..P WKT 2011 02 13 21 54 55 31.3200 -97.3300 251.000 457.0 156.393 3.330 -999.990 -999.990 1.564 ..P WKT 2011 02 13 21 59 55 31.3200 -97.3300 251.000 30.0 163.907 3.030 -999.990 -999.990 1.639 ..P WKT 2011 02 13 22 04 55 31.3200 -97.3300 251.000 122.0 158.106 3.930 -999.990 -999.990 1.581 ..P WKT 2011 02 13 22 09 55 31.3200 -97.3300 251.000 457.0 161.625 4.420 -999.990 -999.990 1.616 ..P WKT 2011 02 13 22 19 55 31.3200 -97.3300 251.000 30.0 159.963 3.250 -999.990 -999.990 1.600 ..P WKT 2011 02 13 22 24 55 31.3200 -97.3300 251.000 122.0 161.105 3.540 -999.990 -999.990 1.611 ..P WKT 2011 02 13 22 29 55 31.3200 -97.3300 251.000 457.0 167.908 3.950 -999.990 -999.990 1.679 ..P WKT 2011 02 13 22 34 55 31.3200 -97.3300 251.000 30.0 167.387 3.450 -999.990 -999.990 1.674 ..P WKT 2011 02 13 22 39 55 31.3200 -97.3300 251.000 122.0 175.190 3.910 -999.990 -999.990 1.752 ..P WKT 2011 02 13 22 44 55 31.3200 -97.3300 251.000 457.0 164.677 3.090 -999.990 -999.990 1.647 ..P WKT 2011 02 13 22 54 55 31.3200 -97.3300 251.000 30.0 172.387 5.450 -999.990 -999.990 1.724 ..P WKT 2011 02 13 22 59 55 31.3200 -97.3300 251.000 122.0 166.298 3.160 -999.990 -999.990 1.663 ..P WKT 2011 02 13 23 04 55 31.3200 -97.3300 251.000 457.0 166.537 3.350 -999.990 -999.990 1.665 ..P WKT 2011 02 13 23 09 55 31.3200 -97.3300 251.000 30.0 170.441 3.910 -999.990 -999.990 1.704 ..P WKT 2011 02 13 23 14 55 31.3200 -97.3300 251.000 122.0 169.681 3.520 -999.990 -999.990 1.697 ..P WKT 2011 02 13 23 19 55 31.3200 -97.3300 251.000 457.0 163.589 5.120 -999.990 -999.990 1.636 ..P WKT 2011 02 13 23 29 55 31.3200 -97.3300 251.000 30.0 161.933 4.150 -999.990 -999.990 1.619 ..P WKT 2011 02 13 23 34 55 31.3200 -97.3300 251.000 122.0 163.705 4.340 -999.990 -999.990 1.637 ..P WKT 2011 02 13 23 39 55 31.3200 -97.3300 251.000 457.0 162.643 3.830 -999.990 -999.990 1.626 ..P WKT 2011 02 13 23 44 55 31.3200 -97.3300 251.000 30.0 163.748 3.970 -999.990 -999.990 1.637 ..P WKT 2011 02 13 23 49 55 31.3200 -97.3300 251.000 122.0 166.520 4.130 -999.990 -999.990 1.665 ..P WKT 2011 02 14 00 09 55 31.3200 -97.3300 251.000 457.0 165.026 5.940 -999.990 -999.990 1.650 ..P WKT 2011 02 14 00 10 25 31.3200 -97.3300 251.000 457.0 160.209 3.970 -999.990 -999.990 1.602 ..P WKT 2011 02 14 00 10 55 31.3200 -97.3300 251.000 457.0 155.059 4.570 -999.990 -999.990 1.551 ..P WKT 2011 02 14 00 11 25 31.3200 -97.3300 251.000 457.0 164.411 4.400 -999.990 -999.990 1.644 ..P WKT 2011 02 14 00 11 55 31.3200 -97.3300 251.000 457.0 156.094 5.400 -999.990 -999.990 1.561 ..P WKT 2011 02 14 00 12 25 31.3200 -97.3300 251.000 457.0 160.612 6.460 -999.990 -999.990 1.606 ..P WKT 2011 02 14 00 12 55 31.3200 -97.3300 251.000 457.0 157.962 5.370 -999.990 -999.990 1.580 ..P WKT 2011 02 14 00 13 25 31.3200 -97.3300 251.000 457.0 160.814 4.480 -999.990 -999.990 1.608 ..P WKT 2011 02 14 00 13 55 31.3200 -97.3300 251.000 457.0 156.996 4.080 -999.990 -999.990 1.570 ..P WKT 2011 02 14 00 14 25 31.3200 -97.3300 251.000 457.0 162.015 3.850 -999.990 -999.990 1.620 ..P WKT 2011 02 14 00 14 55 31.3200 -97.3300 251.000 457.0 167.867 3.940 -999.990 -999.990 1.679 ..P WKT 2011 02 14 00 19 55 31.3200 -97.3300 251.000 30.0 157.705 3.580 -999.990 -999.990 1.577 ..P WKT 2011 02 14 00 24 55 31.3200 -97.3300 251.000 122.0 155.378 3.970 -999.990 -999.990 1.554 ..P WKT 2011 02 14 00 29 55 31.3200 -97.3300 251.000 457.0 159.387 3.710 -999.990 -999.990 1.594 ..P WKT 2011 02 14 00 34 55 31.3200 -97.3300 251.000 30.0 163.227 3.450 -999.990 -999.990 1.632 ..P WKT 2011 02 14 00 39 55 31.3200 -97.3300 251.000 122.0 155.733 3.920 -999.990 -999.990 1.557 ..P WKT 2011 02 14 00 44 55 31.3200 -97.3300 251.000 457.0 153.906 4.120 -999.990 -999.990 1.539 ..P WKT 2011 02 14 00 54 55 31.3200 -97.3300 251.000 30.0 164.589 3.980 -999.990 -999.990 1.646 ..P WKT 2011 02 14 00 59 55 31.3200 -97.3300 251.000 122.0 158.261 3.620 -999.990 -999.990 1.583 ..P WKT 2011 02 14 01 04 55 31.3200 -97.3300 251.000 457.0 162.436 4.040 -999.990 -999.990 1.624 ..P WKT 2011 02 14 01 09 55 31.3200 -97.3300 251.000 30.0 157.441 4.220 -999.990 -999.990 1.574 ..P WKT 2011 02 14 01 14 55 31.3200 -97.3300 251.000 122.0 154.448 3.690 -999.990 -999.990 1.544 ..P WKT 2011 02 14 01 19 55 31.3200 -97.3300 251.000 457.0 161.124 3.690 -999.990 -999.990 1.611 ..P WKT 2011 02 14 01 29 55 31.3200 -97.3300 251.000 30.0 150.706 4.820 -999.990 -999.990 1.507 ..P WKT 2011 02 14 01 34 55 31.3200 -97.3300 251.000 122.0 154.952 4.060 -999.990 -999.990 1.550 ..P WKT 2011 02 14 01 39 55 31.3200 -97.3300 251.000 457.0 160.699 3.780 -999.990 -999.990 1.607 ..P WKT 2011 02 14 01 44 55 31.3200 -97.3300 251.000 30.0 152.774 3.640 -999.990 -999.990 1.528 ..P WKT 2011 02 14 01 49 55 31.3200 -97.3300 251.000 122.0 153.519 3.780 -999.990 -999.990 1.535 ..P WKT 2011 02 14 01 54 55 31.3200 -97.3300 251.000 457.0 154.931 4.820 -999.990 -999.990 1.549 ..P WKT 2011 02 14 02 04 55 31.3200 -97.3300 251.000 30.0 155.398 3.460 -999.990 -999.990 1.554 ..P WKT 2011 02 14 02 09 55 31.3200 -97.3300 251.000 122.0 147.116 3.840 -999.990 -999.990 1.471 ..P WKT 2011 02 14 02 14 55 31.3200 -97.3300 251.000 457.0 150.172 3.270 -999.990 -999.990 1.502 ..P WKT 2011 02 14 02 19 55 31.3200 -97.3300 251.000 30.0 149.226 2.920 -999.990 -999.990 1.492 ..P WKT 2011 02 14 02 24 55 31.3200 -97.3300 251.000 122.0 149.281 3.330 -999.990 -999.990 1.493 ..P WKT 2011 02 14 02 29 55 31.3200 -97.3300 251.000 457.0 142.332 3.760 -999.990 -999.990 1.423 ..P WKT 2011 02 14 02 39 55 31.3200 -97.3300 251.000 30.0 153.732 3.460 -999.990 -999.990 1.537 ..P WKT 2011 02 14 02 44 55 31.3200 -97.3300 251.000 122.0 155.407 3.220 -999.990 -999.990 1.554 ..P WKT 2011 02 14 02 49 55 31.3200 -97.3300 251.000 457.0 145.741 3.550 -999.990 -999.990 1.457 ..P WKT 2011 02 14 02 54 55 31.3200 -97.3300 251.000 30.0 156.420 3.700 -999.990 -999.990 1.564 ..P WKT 2011 02 14 02 59 55 31.3200 -97.3300 251.000 122.0 149.090 4.600 -999.990 -999.990 1.491 ..P WKT 2011 02 14 03 04 55 31.3200 -97.3300 251.000 457.0 143.094 4.790 -999.990 -999.990 1.431 ..P WKT 2011 02 14 03 14 55 31.3200 -97.3300 251.000 30.0 149.611 4.500 -999.990 -999.990 1.496 ..P WKT 2011 02 14 03 19 55 31.3200 -97.3300 251.000 122.0 147.117 4.960 -999.990 -999.990 1.471 ..P WKT 2011 02 14 03 24 55 31.3200 -97.3300 251.000 457.0 155.295 3.920 -999.990 -999.990 1.553 ..P WKT 2011 02 14 03 29 55 31.3200 -97.3300 251.000 30.0 152.300 3.610 -999.990 -999.990 1.523 ..P WKT 2011 02 14 03 34 55 31.3200 -97.3300 251.000 122.0 155.476 3.830 -999.990 -999.990 1.555 ..P WKT 2011 02 14 03 39 55 31.3200 -97.3300 251.000 457.0 146.144 5.300 -999.990 -999.990 1.461 ..P WKT 2011 02 14 03 49 55 31.3200 -97.3300 251.000 30.0 150.946 3.490 -999.990 -999.990 1.509 ..P WKT 2011 02 14 03 54 55 31.3200 -97.3300 251.000 122.0 152.906 4.440 -999.990 -999.990 1.529 ..P WKT 2011 02 14 03 59 55 31.3200 -97.3300 251.000 457.0 149.197 2.940 -999.990 -999.990 1.492 ..P WKT 2011 02 14 04 04 55 31.3200 -97.3300 251.000 30.0 147.654 2.950 -999.990 -999.990 1.477 ..P WKT 2011 02 14 04 09 55 31.3200 -97.3300 251.000 122.0 144.278 2.940 -999.990 -999.990 1.443 ..P WKT 2011 02 14 04 14 55 31.3200 -97.3300 251.000 457.0 143.904 3.070 -999.990 -999.990 1.439 ..P WKT 2011 02 14 04 24 55 31.3200 -97.3300 251.000 30.0 150.636 4.780 -999.990 -999.990 1.506 ..P WKT 2011 02 14 04 29 55 31.3200 -97.3300 251.000 122.0 153.741 2.920 -999.990 -999.990 1.537 ..P WKT 2011 02 14 04 34 55 31.3200 -97.3300 251.000 457.0 145.504 3.990 -999.990 -999.990 1.455 ..P WKT 2011 02 14 04 39 55 31.3200 -97.3300 251.000 30.0 155.781 3.640 -999.990 -999.990 1.558 ..P WKT 2011 02 14 04 44 55 31.3200 -97.3300 251.000 122.0 158.885 3.460 -999.990 -999.990 1.589 ..P WKT 2011 02 14 04 49 55 31.3200 -97.3300 251.000 457.0 147.979 4.110 -999.990 -999.990 1.480 ..P WKT 2011 02 14 05 04 55 31.3200 -97.3300 251.000 30.0 155.059 4.470 -999.990 -999.990 1.551 ..P WKT 2011 02 14 05 09 55 31.3200 -97.3300 251.000 122.0 152.376 4.950 -999.990 -999.990 1.524 ..P WKT 2011 02 14 05 14 55 31.3200 -97.3300 251.000 457.0 139.518 4.820 -999.990 -999.990 1.395 ..P WKT 2011 02 14 05 19 55 31.3200 -97.3300 251.000 30.0 154.850 5.010 -999.990 -999.990 1.548 ..P WKT 2011 02 14 05 24 55 31.3200 -97.3300 251.000 122.0 155.336 5.290 -999.990 -999.990 1.553 ..P WKT 2011 02 14 05 29 55 31.3200 -97.3300 251.000 457.0 194.522 4.260 -999.990 -999.990 1.945 ..P WKT 2011 02 14 05 39 55 31.3200 -97.3300 251.000 30.0 152.694 4.180 -999.990 -999.990 1.527 ..P WKT 2011 02 14 05 44 55 31.3200 -97.3300 251.000 122.0 152.081 4.540 -999.990 -999.990 1.521 ..P WKT 2011 02 14 05 49 55 31.3200 -97.3300 251.000 457.0 156.140 4.410 -999.990 -999.990 1.561 ..P WKT 2011 02 14 05 54 55 31.3200 -97.3300 251.000 30.0 155.861 4.060 -999.990 -999.990 1.559 ..P WKT 2011 02 14 05 59 55 31.3200 -97.3300 251.000 122.0 149.576 4.810 -999.990 -999.990 1.496 ..P WKT 2011 02 14 06 04 55 31.3200 -97.3300 251.000 457.0 163.643 3.170 -999.990 -999.990 1.636 ..P WKT 2011 02 14 06 14 55 31.3200 -97.3300 251.000 30.0 146.546 3.240 -999.990 -999.990 1.465 ..P WKT 2011 02 14 06 19 55 31.3200 -97.3300 251.000 122.0 141.740 3.380 -999.990 -999.990 1.417 ..P WKT 2011 02 14 06 24 55 31.3200 -97.3300 251.000 457.0 148.277 3.130 -999.990 -999.990 1.483 ..P WKT 2011 02 14 06 29 55 31.3200 -97.3300 251.000 30.0 143.803 3.640 -999.990 -999.990 1.438 ..P WKT 2011 02 14 06 34 55 31.3200 -97.3300 251.000 122.0 133.657 3.310 -999.990 -999.990 1.337 ..P WKT 2011 02 14 06 39 55 31.3200 -97.3300 251.000 457.0 168.889 5.280 -999.990 -999.990 1.689 ..P WKT 2011 02 14 06 49 55 31.3200 -97.3300 251.000 30.0 138.825 3.660 -999.990 -999.990 1.388 ..P WKT 2011 02 14 06 54 55 31.3200 -97.3300 251.000 122.0 143.932 3.030 -999.990 -999.990 1.439 ..P WKT 2011 02 14 06 59 55 31.3200 -97.3300 251.000 457.0 157.048 3.700 -999.990 -999.990 1.570 ..P WKT 2011 02 14 07 04 55 31.3200 -97.3300 251.000 30.0 137.796 3.010 -999.990 -999.990 1.378 ..P WKT 2011 02 14 07 09 55 31.3200 -97.3300 251.000 122.0 141.235 2.860 -999.990 -999.990 1.412 ..P WKT 2011 02 14 07 14 55 31.3200 -97.3300 251.000 457.0 146.343 2.800 -999.990 -999.990 1.463 ..P WKT 2011 02 14 07 24 55 31.3200 -97.3300 251.000 30.0 139.111 3.030 -999.990 -999.990 1.391 ..P WKT 2011 02 14 07 29 55 31.3200 -97.3300 251.000 122.0 141.453 3.070 -999.990 -999.990 1.415 ..P WKT 2011 02 14 07 34 55 31.3200 -97.3300 251.000 457.0 148.468 3.220 -999.990 -999.990 1.485 ..P WKT 2011 02 14 07 39 55 31.3200 -97.3300 251.000 30.0 142.968 4.860 -999.990 -999.990 1.430 ..P WKT 2011 02 14 07 44 55 31.3200 -97.3300 251.000 122.0 151.485 3.410 -999.990 -999.990 1.515 ..P WKT 2011 02 14 07 49 55 31.3200 -97.3300 251.000 457.0 158.500 3.400 -999.990 -999.990 1.585 ..P WKT 2011 02 14 07 59 55 31.3200 -97.3300 251.000 30.0 143.568 4.440 -999.990 -999.990 1.436 ..P WKT 2011 02 14 08 04 55 31.3200 -97.3300 251.000 122.0 155.160 2.990 -999.990 -999.990 1.552 ..P WKT 2011 02 14 08 09 55 31.3200 -97.3300 251.000 457.0 171.924 4.420 -999.990 -999.990 1.719 ..P WKT 2011 02 14 08 14 55 31.3200 -97.3300 251.000 30.0 145.638 4.970 -999.990 -999.990 1.456 ..P WKT 2011 02 14 08 19 55 31.3200 -97.3300 251.000 122.0 153.559 4.450 -999.990 -999.990 1.536 ..P WKT 2011 02 14 08 24 55 31.3200 -97.3300 251.000 457.0 164.150 3.810 -999.990 -999.990 1.642 ..P WKT 2011 02 14 08 34 55 31.3200 -97.3300 251.000 30.0 147.334 3.620 -999.990 -999.990 1.473 ..P WKT 2011 02 14 08 39 55 31.3200 -97.3300 251.000 122.0 152.967 4.510 -999.990 -999.990 1.530 ..P WKT 2011 02 14 08 44 55 31.3200 -97.3300 251.000 457.0 158.766 5.080 -999.990 -999.990 1.588 ..P WKT 2011 02 14 08 49 55 31.3200 -97.3300 251.000 30.0 154.387 3.920 -999.990 -999.990 1.544 ..P WKT 2011 02 14 08 54 55 31.3200 -97.3300 251.000 122.0 153.011 3.160 -999.990 -999.990 1.530 ..P WKT 2011 02 14 08 59 55 31.3200 -97.3300 251.000 457.0 151.470 4.100 -999.990 -999.990 1.515 ..P WKT 2011 02 14 09 09 55 31.3200 -97.3300 251.000 30.0 143.139 3.530 -999.990 -999.990 1.431 ..P WKT 2011 02 14 09 14 55 31.3200 -97.3300 251.000 122.0 151.204 3.570 -999.990 -999.990 1.512 ..P WKT 2011 02 14 09 19 55 31.3200 -97.3300 251.000 457.0 148.756 5.220 -999.990 -999.990 1.488 ..P WKT 2011 02 14 09 24 55 31.3200 -97.3300 251.000 30.0 151.146 3.530 -999.990 -999.990 1.511 ..P WKT 2011 02 14 09 29 55 31.3200 -97.3300 251.000 122.0 147.863 3.600 -999.990 -999.990 1.479 ..P WKT 2011 02 14 09 34 55 31.3200 -97.3300 251.000 457.0 152.257 3.840 -999.990 -999.990 1.523 ..P WKT 2011 02 14 09 44 55 31.3200 -97.3300 251.000 30.0 150.315 3.590 -999.990 -999.990 1.503 ..P WKT 2011 02 14 09 49 55 31.3200 -97.3300 251.000 122.0 147.652 3.570 -999.990 -999.990 1.477 ..P WKT 2011 02 14 09 54 55 31.3200 -97.3300 251.000 457.0 154.334 4.150 -999.990 -999.990 1.543 ..P WKT 2011 02 14 09 59 55 31.3200 -97.3300 251.000 30.0 153.674 5.390 -999.990 -999.990 1.537 ..P WKT 2011 02 14 10 04 55 31.3200 -97.3300 251.000 122.0 157.687 4.730 -999.990 -999.990 1.577 ..P WKT 2011 02 14 10 09 55 31.3200 -97.3300 251.000 457.0 155.691 3.600 -999.990 -999.990 1.557 ..P WKT 2011 02 14 10 19 55 31.3200 -97.3300 251.000 30.0 157.279 5.240 -999.990 -999.990 1.573 ..P WKT 2011 02 14 10 24 55 31.3200 -97.3300 251.000 122.0 146.842 4.390 -999.990 -999.990 1.468 ..P WKT 2011 02 14 10 29 55 31.3200 -97.3300 251.000 457.0 149.424 5.240 -999.990 -999.990 1.494 ..P WKT 2011 02 14 10 34 55 31.3200 -97.3300 251.000 30.0 150.670 4.730 -999.990 -999.990 1.507 ..P WKT 2011 02 14 10 39 55 31.3200 -97.3300 251.000 122.0 144.574 3.870 -999.990 -999.990 1.446 ..P WKT 2011 02 14 10 44 55 31.3200 -97.3300 251.000 457.0 151.829 2.860 -999.990 -999.990 1.518 ..P WKT 2011 02 14 10 54 55 31.3200 -97.3300 251.000 30.0 144.951 4.370 -999.990 -999.990 1.450 ..P WKT 2011 02 14 10 59 55 31.3200 -97.3300 251.000 122.0 144.171 5.380 -999.990 -999.990 1.442 ..P WKT 2011 02 14 11 04 55 31.3200 -97.3300 251.000 457.0 137.716 3.470 -999.990 -999.990 1.377 ..P WKT 2011 02 14 11 09 55 31.3200 -97.3300 251.000 30.0 151.958 2.900 -999.990 -999.990 1.520 ..P WKT 2011 02 14 11 14 55 31.3200 -97.3300 251.000 122.0 136.156 3.980 -999.990 -999.990 1.362 ..P WKT 2011 02 14 11 19 55 31.3200 -97.3300 251.000 457.0 134.707 3.410 -999.990 -999.990 1.347 ..P WKT 2011 02 14 11 29 55 31.3200 -97.3300 251.000 30.0 146.829 3.320 -999.990 -999.990 1.468 ..P WKT 2011 02 14 11 34 55 31.3200 -97.3300 251.000 122.0 132.688 3.770 -999.990 -999.990 1.327 ..P WKT 2011 02 14 11 39 55 31.3200 -97.3300 251.000 457.0 138.580 4.410 -999.990 -999.990 1.386 ..P WKT 2011 02 14 11 44 55 31.3200 -97.3300 251.000 30.0 148.978 3.200 -999.990 -999.990 1.490 ..P WKT 2011 02 14 11 49 55 31.3200 -97.3300 251.000 122.0 137.341 3.790 -999.990 -999.990 1.373 ..P WKT 2011 02 14 12 09 55 31.3200 -97.3300 251.000 457.0 132.799 2.780 -999.990 -999.990 1.328 ..P WKT 2011 02 14 12 10 25 31.3200 -97.3300 251.000 457.0 137.028 3.150 -999.990 -999.990 1.370 ..P WKT 2011 02 14 12 10 55 31.3200 -97.3300 251.000 457.0 133.744 2.950 -999.990 -999.990 1.337 ..P WKT 2011 02 14 12 11 25 31.3200 -97.3300 251.000 457.0 134.133 2.740 -999.990 -999.990 1.341 ..P WKT 2011 02 14 12 11 55 31.3200 -97.3300 251.000 457.0 139.529 3.090 -999.990 -999.990 1.395 ..P WKT 2011 02 14 12 12 25 31.3200 -97.3300 251.000 457.0 139.251 3.110 -999.990 -999.990 1.393 ..P WKT 2011 02 14 12 12 55 31.3200 -97.3300 251.000 457.0 136.634 3.770 -999.990 -999.990 1.366 ..P WKT 2011 02 14 12 13 25 31.3200 -97.3300 251.000 457.0 128.676 3.370 -999.990 -999.990 1.287 ..P WKT 2011 02 14 12 13 55 31.3200 -97.3300 251.000 457.0 131.068 4.050 -999.990 -999.990 1.311 ..P WKT 2011 02 14 12 14 25 31.3200 -97.3300 251.000 457.0 136.298 3.650 -999.990 -999.990 1.363 ..P WKT 2011 02 14 12 14 55 31.3200 -97.3300 251.000 457.0 135.685 3.050 -999.990 -999.990 1.357 ..P WKT 2011 02 14 12 19 55 31.3200 -97.3300 251.000 30.0 153.095 4.170 -999.990 -999.990 1.531 ..P WKT 2011 02 14 12 24 55 31.3200 -97.3300 251.000 122.0 136.782 4.040 -999.990 -999.990 1.368 ..P WKT 2011 02 14 12 29 55 31.3200 -97.3300 251.000 457.0 135.493 3.270 -999.990 -999.990 1.355 ..P WKT 2011 02 14 12 34 55 31.3200 -97.3300 251.000 30.0 151.567 3.840 -999.990 -999.990 1.516 ..P WKT 2011 02 14 12 39 55 31.3200 -97.3300 251.000 122.0 143.769 3.130 -999.990 -999.990 1.438 ..P WKT 2011 02 14 12 44 55 31.3200 -97.3300 251.000 457.0 137.807 3.970 -999.990 -999.990 1.378 ..P WKT 2011 02 14 12 54 55 31.3200 -97.3300 251.000 30.0 155.403 3.500 -999.990 -999.990 1.554 ..P WKT 2011 02 14 12 59 55 31.3200 -97.3300 251.000 122.0 147.077 4.100 -999.990 -999.990 1.471 ..P WKT 2011 02 14 13 04 55 31.3200 -97.3300 251.000 457.0 137.750 3.430 -999.990 -999.990 1.377 ..P WKT 2011 02 14 13 09 55 31.3200 -97.3300 251.000 30.0 161.810 4.280 -999.990 -999.990 1.618 ..P WKT 2011 02 14 13 14 55 31.3200 -97.3300 251.000 122.0 149.978 3.860 -999.990 -999.990 1.500 ..P WKT 2011 02 14 13 19 55 31.3200 -97.3300 251.000 457.0 141.986 4.230 -999.990 -999.990 1.420 ..P WKT 2011 02 14 13 29 55 31.3200 -97.3300 251.000 30.0 166.877 4.530 -999.990 -999.990 1.669 ..P WKT 2011 02 14 13 34 55 31.3200 -97.3300 251.000 122.0 148.679 4.850 -999.990 -999.990 1.487 ..P WKT 2011 02 14 13 39 55 31.3200 -97.3300 251.000 457.0 142.833 4.080 -999.990 -999.990 1.428 ..P WKT 2011 02 14 13 44 55 31.3200 -97.3300 251.000 30.0 166.366 4.960 -999.990 -999.990 1.664 ..P WKT 2011 02 14 13 49 55 31.3200 -97.3300 251.000 122.0 143.828 3.850 -999.990 -999.990 1.438 ..P WKT 2011 02 14 13 54 55 31.3200 -97.3300 251.000 457.0 140.321 4.110 -999.990 -999.990 1.403 ..P WKT 2011 02 14 14 04 55 31.3200 -97.3300 251.000 30.0 173.079 4.800 -999.990 -999.990 1.731 ..P WKT 2011 02 14 14 09 55 31.3200 -97.3300 251.000 122.0 144.580 3.670 -999.990 -999.990 1.446 ..P WKT 2011 02 14 14 14 55 31.3200 -97.3300 251.000 457.0 136.446 3.680 -999.990 -999.990 1.364 ..P WKT 2011 02 14 14 19 55 31.3200 -97.3300 251.000 30.0 170.709 4.050 -999.990 -999.990 1.707 ..P WKT 2011 02 14 14 24 55 31.3200 -97.3300 251.000 122.0 148.888 3.690 -999.990 -999.990 1.489 ..P WKT 2011 02 14 14 29 55 31.3200 -97.3300 251.000 457.0 138.083 3.900 -999.990 -999.990 1.381 ..P WKT 2011 02 14 14 39 55 31.3200 -97.3300 251.000 30.0 182.714 3.850 -999.990 -999.990 1.827 ..P WKT 2011 02 14 14 44 55 31.3200 -97.3300 251.000 122.0 149.687 4.020 -999.990 -999.990 1.497 ..P WKT 2011 02 14 14 49 55 31.3200 -97.3300 251.000 457.0 138.691 4.360 -999.990 -999.990 1.387 ..P WKT 2011 02 14 14 54 55 31.3200 -97.3300 251.000 30.0 180.773 5.070 -999.990 -999.990 1.808 ..P WKT 2011 02 14 14 59 55 31.3200 -97.3300 251.000 122.0 156.426 4.340 -999.990 -999.990 1.564 ..P WKT 2011 02 14 15 04 55 31.3200 -97.3300 251.000 457.0 137.086 4.480 -999.990 -999.990 1.371 ..P WKT 2011 02 14 15 14 55 31.3200 -97.3300 251.000 30.0 169.792 5.560 -999.990 -999.990 1.698 ..P WKT 2011 02 14 15 19 55 31.3200 -97.3300 251.000 122.0 152.575 4.300 -999.990 -999.990 1.526 ..P WKT 2011 02 14 15 24 55 31.3200 -97.3300 251.000 457.0 144.537 4.660 -999.990 -999.990 1.445 ..P WKT 2011 02 14 15 29 55 31.3200 -97.3300 251.000 30.0 160.198 4.150 -999.990 -999.990 1.602 ..P WKT 2011 02 14 15 34 55 31.3200 -97.3300 251.000 122.0 157.667 4.870 -999.990 -999.990 1.577 ..P WKT 2011 02 14 15 39 55 31.3200 -97.3300 251.000 457.0 139.783 3.750 -999.990 -999.990 1.398 ..P WKT 2011 02 14 15 49 55 31.3200 -97.3300 251.000 30.0 158.612 5.100 -999.990 -999.990 1.586 ..P WKT 2011 02 14 15 54 55 31.3200 -97.3300 251.000 122.0 162.614 4.180 -999.990 -999.990 1.626 ..P WKT 2011 02 14 15 59 55 31.3200 -97.3300 251.000 457.0 142.585 4.610 -999.990 -999.990 1.426 ..P WKT 2011 02 14 16 04 55 31.3200 -97.3300 251.000 30.0 161.607 4.100 -999.990 -999.990 1.616 ..P WKT 2011 02 14 16 09 55 31.3200 -97.3300 251.000 122.0 157.766 4.340 -999.990 -999.990 1.578 ..P WKT 2011 02 14 16 14 55 31.3200 -97.3300 251.000 457.0 141.074 4.650 -999.990 -999.990 1.411 ..P WKT 2011 02 14 16 24 55 31.3200 -97.3300 251.000 30.0 160.999 4.350 -999.990 -999.990 1.610 ..P WKT 2011 02 14 16 29 55 31.3200 -97.3300 251.000 122.0 161.234 4.140 -999.990 -999.990 1.612 ..P WKT 2011 02 14 16 34 55 31.3200 -97.3300 251.000 457.0 148.287 4.560 -999.990 -999.990 1.483 ..P WKT 2011 02 14 16 39 55 31.3200 -97.3300 251.000 30.0 156.364 5.970 -999.990 -999.990 1.564 ..P WKT 2011 02 14 16 44 55 31.3200 -97.3300 251.000 122.0 167.280 3.940 -999.990 -999.990 1.673 ..P WKT 2011 02 14 16 49 55 31.3200 -97.3300 251.000 457.0 147.825 4.280 -999.990 -999.990 1.478 ..P WKT 2011 02 14 17 04 55 31.3200 -97.3300 251.000 30.0 178.084 3.980 -999.990 -999.990 1.781 ..P WKT 2011 02 14 17 09 55 31.3200 -97.3300 251.000 122.0 182.082 4.250 -999.990 -999.990 1.821 ..P WKT 2011 02 14 17 14 55 31.3200 -97.3300 251.000 457.0 140.695 4.320 -999.990 -999.990 1.407 ..P WKT 2011 02 14 17 19 55 31.3200 -97.3300 251.000 30.0 181.570 5.300 -999.990 -999.990 1.816 ..P WKT 2011 02 14 17 24 55 31.3200 -97.3300 251.000 122.0 180.396 4.270 -999.990 -999.990 1.804 ..P WKT 2011 02 14 17 29 55 31.3200 -97.3300 251.000 457.0 144.182 4.020 -999.990 -999.990 1.442 ..P WKT 2011 02 14 17 39 55 31.3200 -97.3300 251.000 30.0 182.025 4.230 -999.990 -999.990 1.820 ..P WKT 2011 02 14 17 44 55 31.3200 -97.3300 251.000 122.0 191.008 4.710 -999.990 -999.990 1.910 ..P WKT 2011 02 14 17 49 55 31.3200 -97.3300 251.000 457.0 145.597 4.100 -999.990 -999.990 1.456 ..P WKT 2011 02 14 17 54 55 31.3200 -97.3300 251.000 30.0 190.619 4.330 -999.990 -999.990 1.906 ..P WKT 2011 02 14 17 59 55 31.3200 -97.3300 251.000 122.0 194.596 4.420 -999.990 -999.990 1.946 ..P WKT 2011 02 14 18 04 55 31.3200 -97.3300 251.000 457.0 151.523 4.970 -999.990 -999.990 1.515 ..P WKT 2011 02 14 18 14 55 31.3200 -97.3300 251.000 30.0 185.744 4.570 -999.990 -999.990 1.857 ..P WKT 2011 02 14 18 19 55 31.3200 -97.3300 251.000 122.0 194.631 5.060 -999.990 -999.990 1.946 ..P WKT 2011 02 14 18 24 55 31.3200 -97.3300 251.000 457.0 152.799 4.420 -999.990 -999.990 1.528 ..P WKT 2011 02 14 18 29 55 31.3200 -97.3300 251.000 30.0 186.711 4.870 -999.990 -999.990 1.867 ..P WKT 2011 02 14 18 34 55 31.3200 -97.3300 251.000 122.0 184.586 4.400 -999.990 -999.990 1.846 ..P WKT 2011 02 14 18 39 55 31.3200 -97.3300 251.000 457.0 179.459 4.710 -999.990 -999.990 1.795 ..P WKT 2011 02 14 18 49 55 31.3200 -97.3300 251.000 30.0 185.744 4.630 -999.990 -999.990 1.857 ..P WKT 2011 02 14 18 54 55 31.3200 -97.3300 251.000 122.0 188.815 4.950 -999.990 -999.990 1.888 ..P WKT 2011 02 14 18 59 55 31.3200 -97.3300 251.000 457.0 169.531 5.640 -999.990 -999.990 1.695 ..P WKT 2011 02 14 19 04 55 31.3200 -97.3300 251.000 30.0 176.272 5.240 -999.990 -999.990 1.763 ..P WKT 2011 02 14 19 09 55 31.3200 -97.3300 251.000 122.0 162.662 5.180 -999.990 -999.990 1.627 ..P WKT 2011 02 14 19 14 55 31.3200 -97.3300 251.000 457.0 168.902 6.510 -999.990 -999.990 1.689 ..P WKT 2011 02 14 19 24 55 31.3200 -97.3300 251.000 30.0 161.460 5.960 -999.990 -999.990 1.615 ..P WKT 2011 02 14 19 29 55 31.3200 -97.3300 251.000 122.0 158.956 5.480 -999.990 -999.990 1.590 ..P WKT 2011 02 14 19 34 55 31.3200 -97.3300 251.000 457.0 159.786 5.560 -999.990 -999.990 1.598 ..P WKT 2011 02 14 19 39 55 31.3200 -97.3300 251.000 30.0 160.785 5.840 -999.990 -999.990 1.608 ..P WKT 2011 02 14 19 44 55 31.3200 -97.3300 251.000 122.0 160.448 5.790 -999.990 -999.990 1.604 ..P WKT 2011 02 14 19 49 55 31.3200 -97.3300 251.000 457.0 156.775 5.000 -999.990 -999.990 1.568 ..P WKT 2011 02 14 19 59 55 31.3200 -97.3300 251.000 30.0 159.939 4.910 -999.990 -999.990 1.599 ..P WKT 2011 02 14 20 04 55 31.3200 -97.3300 251.000 122.0 166.774 6.400 -999.990 -999.990 1.668 ..P WKT 2011 02 14 20 09 55 31.3200 -97.3300 251.000 457.0 157.764 5.990 -999.990 -999.990 1.578 ..P WKT 2011 02 14 20 14 55 31.3200 -97.3300 251.000 30.0 158.095 6.690 -999.990 -999.990 1.581 ..P WKT 2011 02 14 20 19 55 31.3200 -97.3300 251.000 122.0 159.592 6.170 -999.990 -999.990 1.596 ..P WKT 2011 02 14 20 24 55 31.3200 -97.3300 251.000 457.0 159.256 6.860 -999.990 -999.990 1.593 ..P WKT 2011 02 14 20 34 55 31.3200 -97.3300 251.000 30.0 159.941 6.380 -999.990 -999.990 1.599 ..P WKT 2011 02 14 20 39 55 31.3200 -97.3300 251.000 122.0 154.124 6.250 -999.990 -999.990 1.541 ..P WKT 2011 02 14 20 44 55 31.3200 -97.3300 251.000 457.0 153.811 6.430 -999.990 -999.990 1.538 ..P WKT 2011 02 14 20 49 55 31.3200 -97.3300 251.000 30.0 151.831 7.640 -999.990 -999.990 1.518 ..P WKT 2011 02 14 20 54 55 31.3200 -97.3300 251.000 122.0 147.182 6.340 -999.990 -999.990 1.472 ..P WKT 2011 02 14 20 59 55 31.3200 -97.3300 251.000 457.0 146.368 6.670 -999.990 -999.990 1.464 ..P WKT 2011 02 14 21 09 55 31.3200 -97.3300 251.000 30.0 147.197 7.260 -999.990 -999.990 1.472 ..P WKT 2011 02 14 21 14 55 31.3200 -97.3300 251.000 122.0 147.171 6.690 -999.990 -999.990 1.472 ..P WKT 2011 02 14 21 19 55 31.3200 -97.3300 251.000 457.0 145.142 5.880 -999.990 -999.990 1.451 ..P WKT 2011 02 14 21 24 55 31.3200 -97.3300 251.000 30.0 146.784 5.640 -999.990 -999.990 1.468 ..P WKT 2011 02 14 21 29 55 31.3200 -97.3300 251.000 122.0 151.093 5.530 -999.990 -999.990 1.511 ..P WKT 2011 02 14 21 34 55 31.3200 -97.3300 251.000 457.0 146.730 5.310 -999.990 -999.990 1.467 ..P WKT 2011 02 14 21 44 55 31.3200 -97.3300 251.000 30.0 150.489 5.040 -999.990 -999.990 1.505 ..P WKT 2011 02 14 21 49 55 31.3200 -97.3300 251.000 122.0 149.604 5.170 -999.990 -999.990 1.496 ..P WKT 2011 02 14 21 54 55 31.3200 -97.3300 251.000 457.0 148.386 5.630 -999.990 -999.990 1.484 ..P WKT 2011 02 14 21 59 55 31.3200 -97.3300 251.000 30.0 147.501 5.380 -999.990 -999.990 1.475 ..P WKT 2011 02 14 22 04 55 31.3200 -97.3300 251.000 122.0 147.618 5.560 -999.990 -999.990 1.476 ..P WKT 2011 02 14 22 09 55 31.3200 -97.3300 251.000 457.0 147.734 5.950 -999.990 -999.990 1.477 ..P WKT 2011 02 14 22 19 55 31.3200 -97.3300 251.000 30.0 139.343 5.760 -999.990 -999.990 1.393 ..P WKT 2011 02 14 22 24 55 31.3200 -97.3300 251.000 122.0 144.509 5.910 -999.990 -999.990 1.445 ..P WKT 2011 02 14 22 29 55 31.3200 -97.3300 251.000 457.0 140.005 6.520 -999.990 -999.990 1.400 ..P WKT 2011 02 14 22 34 55 31.3200 -97.3300 251.000 30.0 142.169 6.010 -999.990 -999.990 1.422 ..P WKT 2011 02 14 22 39 55 31.3200 -97.3300 251.000 122.0 147.336 6.290 -999.990 -999.990 1.473 ..P WKT 2011 02 14 22 44 55 31.3200 -97.3300 251.000 457.0 140.830 6.110 -999.990 -999.990 1.408 ..P WKT 2011 02 14 22 54 55 31.3200 -97.3300 251.000 30.0 141.682 6.330 -999.990 -999.990 1.417 ..P WKT 2011 02 14 22 59 55 31.3200 -97.3300 251.000 122.0 138.368 6.300 -999.990 -999.990 1.384 ..P WKT 2011 02 14 23 04 55 31.3200 -97.3300 251.000 457.0 148.060 7.090 -999.990 -999.990 1.481 ..P WKT 2011 02 14 23 09 55 31.3200 -97.3300 251.000 30.0 140.078 6.340 -999.990 -999.990 1.401 ..P WKT 2011 02 14 23 14 55 31.3200 -97.3300 251.000 122.0 145.433 6.450 -999.990 -999.990 1.454 ..P WKT 2011 02 14 23 19 55 31.3200 -97.3300 251.000 457.0 146.288 6.870 -999.990 -999.990 1.463 ..P WKT 2011 02 14 23 29 55 31.3200 -97.3300 251.000 30.0 146.470 7.580 -999.990 -999.990 1.465 ..P WKT 2011 02 14 23 34 55 31.3200 -97.3300 251.000 122.0 141.296 6.500 -999.990 -999.990 1.413 ..P WKT 2011 02 14 23 39 55 31.3200 -97.3300 251.000 457.0 139.623 6.180 -999.990 -999.990 1.396 ..P WKT 2011 02 14 23 44 55 31.3200 -97.3300 251.000 30.0 147.119 6.400 -999.990 -999.990 1.471 ..P WKT 2011 02 14 23 49 55 31.3200 -97.3300 251.000 122.0 149.447 6.300 -999.990 -999.990 1.494 ..P WKT 2011 02 15 00 09 55 31.3200 -97.3300 251.000 457.0 144.173 6.030 -999.990 -999.990 1.442 ..P WKT 2011 02 15 00 10 25 31.3200 -97.3300 251.000 457.0 149.153 5.870 -999.990 -999.990 1.492 ..P WKT 2011 02 15 00 10 55 31.3200 -97.3300 251.000 457.0 145.300 6.080 -999.990 -999.990 1.453 ..P WKT 2011 02 15 00 11 25 31.3200 -97.3300 251.000 457.0 147.947 5.960 -999.990 -999.990 1.479 ..P WKT 2011 02 15 00 11 55 31.3200 -97.3300 251.000 457.0 145.592 5.670 -999.990 -999.990 1.456 ..P WKT 2011 02 15 00 12 25 31.3200 -97.3300 251.000 457.0 139.405 6.290 -999.990 -999.990 1.394 ..P WKT 2011 02 15 00 12 55 31.3200 -97.3300 251.000 457.0 136.550 6.210 -999.990 -999.990 1.366 ..P WKT 2011 02 15 00 13 25 31.3200 -97.3300 251.000 457.0 147.031 6.490 -999.990 -999.990 1.470 ..P WKT 2011 02 15 00 13 55 31.3200 -97.3300 251.000 457.0 143.344 6.910 -999.990 -999.990 1.433 ..P WKT 2011 02 15 00 14 25 31.3200 -97.3300 251.000 457.0 141.824 6.030 -999.990 -999.990 1.418 ..P WKT 2011 02 15 00 14 55 31.3200 -97.3300 251.000 457.0 148.137 5.890 -999.990 -999.990 1.481 ..P WKT 2011 02 15 00 19 55 31.3200 -97.3300 251.000 30.0 137.432 5.660 -999.990 -999.990 1.374 ..P WKT 2011 02 15 00 24 55 31.3200 -97.3300 251.000 122.0 137.229 6.330 -999.990 -999.990 1.372 ..P WKT 2011 02 15 00 29 55 31.3200 -97.3300 251.000 457.0 140.026 5.950 -999.990 -999.990 1.400 ..P WKT 2011 02 15 00 34 55 31.3200 -97.3300 251.000 30.0 135.488 5.930 -999.990 -999.990 1.355 ..P WKT 2011 02 15 00 39 55 31.3200 -97.3300 251.000 122.0 145.288 5.840 -999.990 -999.990 1.453 ..P WKT 2011 02 15 00 44 55 31.3200 -97.3300 251.000 457.0 135.747 5.920 -999.990 -999.990 1.357 ..P WKT 2011 02 15 00 54 55 31.3200 -97.3300 251.000 30.0 142.512 6.070 -999.990 -999.990 1.425 ..P WKT 2011 02 15 00 59 55 31.3200 -97.3300 251.000 122.0 143.145 5.920 -999.990 -999.990 1.431 ..P WKT 2011 02 15 01 04 55 31.3200 -97.3300 251.000 457.0 144.778 5.800 -999.990 -999.990 1.448 ..P WKT 2011 02 15 01 09 55 31.3200 -97.3300 251.000 30.0 147.912 6.090 -999.990 -999.990 1.479 ..P WKT 2011 02 15 01 14 55 31.3200 -97.3300 251.000 122.0 141.708 5.780 -999.990 -999.990 1.417 ..P WKT 2011 02 15 01 19 55 31.3200 -97.3300 251.000 457.0 139.173 5.670 -999.990 -999.990 1.392 ..P WKT 2011 02 15 01 29 55 31.3200 -97.3300 251.000 30.0 142.583 7.320 -999.990 -999.990 1.426 ..P WKT 2011 02 15 01 34 55 31.3200 -97.3300 251.000 122.0 142.191 6.260 -999.990 -999.990 1.422 ..P WKT 2011 02 15 01 39 55 31.3200 -97.3300 251.000 457.0 141.466 6.280 -999.990 -999.990 1.415 ..P WKT 2011 02 15 01 44 55 31.3200 -97.3300 251.000 30.0 143.743 5.880 -999.990 -999.990 1.437 ..P WKT 2011 02 15 01 49 55 31.3200 -97.3300 251.000 122.0 141.684 6.020 -999.990 -999.990 1.417 ..P WKT 2011 02 15 01 54 55 31.3200 -97.3300 251.000 457.0 136.288 5.010 -999.990 -999.990 1.363 ..P WKT 2011 02 15 02 04 55 31.3200 -97.3300 251.000 30.0 135.790 4.920 -999.990 -999.990 1.358 ..P WKT 2011 02 15 02 09 55 31.3200 -97.3300 251.000 122.0 141.689 4.910 -999.990 -999.990 1.417 ..P WKT 2011 02 15 02 14 55 31.3200 -97.3300 251.000 457.0 136.914 5.520 -999.990 -999.990 1.369 ..P WKT 2011 02 15 02 19 55 31.3200 -97.3300 251.000 30.0 131.470 6.470 -999.990 -999.990 1.315 ..P WKT 2011 02 15 02 24 55 31.3200 -97.3300 251.000 122.0 126.026 5.480 -999.990 -999.990 1.260 ..P WKT 2011 02 15 02 29 55 31.3200 -97.3300 251.000 457.0 122.917 5.010 -999.990 -999.990 1.229 ..P WKT 2011 02 15 02 39 55 31.3200 -97.3300 251.000 30.0 131.571 4.930 -999.990 -999.990 1.316 ..P WKT 2011 02 15 02 44 55 31.3200 -97.3300 251.000 122.0 133.323 5.710 -999.990 -999.990 1.333 ..P WKT 2011 02 15 02 49 55 31.3200 -97.3300 251.000 457.0 133.742 6.230 -999.990 -999.990 1.337 ..P WKT 2011 02 15 02 54 55 31.3200 -97.3300 251.000 30.0 142.169 5.350 -999.990 -999.990 1.422 ..P WKT 2011 02 15 02 59 55 31.3200 -97.3300 251.000 122.0 137.916 5.660 -999.990 -999.990 1.379 ..P WKT 2011 02 15 03 04 55 31.3200 -97.3300 251.000 457.0 142.506 6.230 -999.990 -999.990 1.425 ..P WKT 2011 02 15 03 14 55 31.3200 -97.3300 251.000 30.0 136.287 5.930 -999.990 -999.990 1.363 ..P WKT 2011 02 15 03 19 55 31.3200 -97.3300 251.000 122.0 139.995 5.640 -999.990 -999.990 1.400 ..P WKT 2011 02 15 03 24 55 31.3200 -97.3300 251.000 457.0 138.030 5.360 -999.990 -999.990 1.380 ..P WKT 2011 02 15 03 29 55 31.3200 -97.3300 251.000 30.0 134.397 5.490 -999.990 -999.990 1.344 ..P WKT 2011 02 15 03 34 55 31.3200 -97.3300 251.000 122.0 133.433 5.000 -999.990 -999.990 1.334 ..P WKT 2011 02 15 03 39 55 31.3200 -97.3300 251.000 457.0 147.488 8.130 -999.990 -999.990 1.475 ..P WKT 2011 02 15 03 49 55 31.3200 -97.3300 251.000 30.0 137.859 4.930 -999.990 -999.990 1.379 ..P WKT 2011 02 15 03 54 55 31.3200 -97.3300 251.000 122.0 145.383 5.200 -999.990 -999.990 1.454 ..P WKT 2011 02 15 03 59 55 31.3200 -97.3300 251.000 457.0 137.052 4.890 -999.990 -999.990 1.371 ..P WKT 2011 02 15 04 04 55 31.3200 -97.3300 251.000 30.0 143.574 5.050 -999.990 -999.990 1.436 ..P WKT 2011 02 15 04 09 55 31.3200 -97.3300 251.000 122.0 141.418 4.930 -999.990 -999.990 1.414 ..P WKT 2011 02 15 04 14 55 31.3200 -97.3300 251.000 457.0 131.751 4.360 -999.990 -999.990 1.318 ..P WKT 2011 02 15 04 24 55 31.3200 -97.3300 251.000 30.0 140.862 4.400 -999.990 -999.990 1.409 ..P WKT 2011 02 15 04 29 55 31.3200 -97.3300 251.000 122.0 138.110 4.510 -999.990 -999.990 1.381 ..P WKT 2011 02 15 04 34 55 31.3200 -97.3300 251.000 457.0 123.839 4.460 -999.990 -999.990 1.238 ..P WKT 2011 02 15 04 39 55 31.3200 -97.3300 251.000 30.0 134.273 4.290 -999.990 -999.990 1.343 ..P WKT 2011 02 15 04 44 55 31.3200 -97.3300 251.000 122.0 134.692 4.530 -999.990 -999.990 1.347 ..P WKT 2011 02 15 04 49 55 31.3200 -97.3300 251.000 457.0 179.183 5.560 -999.990 -999.990 1.792 ..P WKT 2011 02 15 05 04 55 31.3200 -97.3300 251.000 30.0 131.347 4.030 -999.990 -999.990 1.313 ..P WKT 2011 02 15 05 09 55 31.3200 -97.3300 251.000 122.0 127.752 4.050 -999.990 -999.990 1.278 ..P WKT 2011 02 15 05 14 55 31.3200 -97.3300 251.000 457.0 131.171 3.900 -999.990 -999.990 1.312 ..P WKT 2011 02 15 05 19 55 31.3200 -97.3300 251.000 30.0 133.253 4.070 -999.990 -999.990 1.333 ..P WKT 2011 02 15 05 24 55 31.3200 -97.3300 251.000 122.0 141.680 4.270 -999.990 -999.990 1.417 ..P WKT 2011 02 15 05 29 55 31.3200 -97.3300 251.000 457.0 128.736 4.070 -999.990 -999.990 1.287 ..P WKT 2011 02 15 05 39 55 31.3200 -97.3300 251.000 30.0 137.868 5.350 -999.990 -999.990 1.379 ..P WKT 2011 02 15 05 44 55 31.3200 -97.3300 251.000 122.0 133.898 4.410 -999.990 -999.990 1.339 ..P WKT 2011 02 15 05 49 55 31.3200 -97.3300 251.000 457.0 144.622 4.150 -999.990 -999.990 1.446 ..P WKT 2011 02 15 05 54 55 31.3200 -97.3300 251.000 30.0 139.650 4.640 -999.990 -999.990 1.397 ..P WKT 2011 02 15 05 59 55 31.3200 -97.3300 251.000 122.0 139.353 4.120 -999.990 -999.990 1.394 ..P WKT 2011 02 15 06 04 55 31.3200 -97.3300 251.000 457.0 141.061 4.120 -999.990 -999.990 1.411 ..P WKT 2011 02 15 06 14 55 31.3200 -97.3300 251.000 30.0 128.778 4.090 -999.990 -999.990 1.288 ..P WKT 2011 02 15 06 19 55 31.3200 -97.3300 251.000 122.0 129.149 3.770 -999.990 -999.990 1.291 ..P WKT 2011 02 15 06 24 55 31.3200 -97.3300 251.000 457.0 124.510 4.050 -999.990 -999.990 1.245 ..P WKT 2011 02 15 06 29 55 31.3200 -97.3300 251.000 30.0 126.551 3.940 -999.990 -999.990 1.266 ..P WKT 2011 02 15 06 34 55 31.3200 -97.3300 251.000 122.0 126.922 3.550 -999.990 -999.990 1.269 ..P WKT 2011 02 15 06 39 55 31.3200 -97.3300 251.000 457.0 135.979 3.900 -999.990 -999.990 1.360 ..P WKT 2011 02 15 06 49 55 31.3200 -97.3300 251.000 30.0 129.373 4.120 -999.990 -999.990 1.294 ..P WKT 2011 02 15 06 54 55 31.3200 -97.3300 251.000 122.0 127.739 3.500 -999.990 -999.990 1.277 ..P WKT 2011 02 15 06 59 55 31.3200 -97.3300 251.000 457.0 126.272 3.720 -999.990 -999.990 1.263 ..P WKT 2011 02 15 07 04 55 31.3200 -97.3300 251.000 30.0 127.479 3.710 -999.990 -999.990 1.275 ..P WKT 2011 02 15 07 09 55 31.3200 -97.3300 251.000 122.0 130.523 3.850 -999.990 -999.990 1.305 ..P WKT 2011 02 15 07 14 55 31.3200 -97.3300 251.000 457.0 125.716 3.920 -999.990 -999.990 1.257 ..P WKT 2011 02 15 07 24 55 31.3200 -97.3300 251.000 30.0 122.234 3.960 -999.990 -999.990 1.222 ..P WKT 2011 02 15 07 29 55 31.3200 -97.3300 251.000 122.0 117.212 3.900 -999.990 -999.990 1.172 ..P WKT 2011 02 15 07 34 55 31.3200 -97.3300 251.000 457.0 124.051 3.300 -999.990 -999.990 1.241 ..P WKT 2011 02 15 07 39 55 31.3200 -97.3300 251.000 30.0 126.545 3.340 -999.990 -999.990 1.265 ..P WKT 2011 02 15 07 44 55 31.3200 -97.3300 251.000 122.0 123.027 2.940 -999.990 -999.990 1.230 ..P WKT 2011 02 15 07 49 55 31.3200 -97.3300 251.000 457.0 126.525 3.290 -999.990 -999.990 1.265 ..P WKT 2011 02 15 07 59 55 31.3200 -97.3300 251.000 30.0 126.336 3.280 -999.990 -999.990 1.263 ..P WKT 2011 02 15 08 04 55 31.3200 -97.3300 251.000 122.0 123.819 5.230 -999.990 -999.990 1.238 ..P WKT 2011 02 15 08 09 55 31.3200 -97.3300 251.000 457.0 129.489 4.520 -999.990 -999.990 1.295 ..P WKT 2011 02 15 08 14 55 31.3200 -97.3300 251.000 30.0 118.452 3.960 -999.990 -999.990 1.185 ..P WKT 2011 02 15 08 19 55 31.3200 -97.3300 251.000 122.0 124.288 4.200 -999.990 -999.990 1.243 ..P WKT 2011 02 15 08 24 55 31.3200 -97.3300 251.000 457.0 126.617 5.060 -999.990 -999.990 1.266 ..P WKT 2011 02 15 08 34 55 31.3200 -97.3300 251.000 30.0 121.511 6.330 -999.990 -999.990 1.215 ..P WKT 2011 02 15 08 39 55 31.3200 -97.3300 251.000 122.0 130.286 4.280 -999.990 -999.990 1.303 ..P WKT 2011 02 15 08 44 55 31.3200 -97.3300 251.000 457.0 132.543 4.620 -999.990 -999.990 1.325 ..P WKT 2011 02 15 08 49 55 31.3200 -97.3300 251.000 30.0 127.281 4.200 -999.990 -999.990 1.273 ..P WKT 2011 02 15 08 54 55 31.3200 -97.3300 251.000 122.0 129.038 3.650 -999.990 -999.990 1.290 ..P WKT 2011 02 15 08 59 55 31.3200 -97.3300 251.000 457.0 132.799 4.290 -999.990 -999.990 1.328 ..P WKT 2011 02 15 09 09 55 31.3200 -97.3300 251.000 30.0 121.724 3.050 -999.990 -999.990 1.217 ..P WKT 2011 02 15 09 14 55 31.3200 -97.3300 251.000 122.0 122.429 3.120 -999.990 -999.990 1.224 ..P WKT 2011 02 15 09 19 55 31.3200 -97.3300 251.000 457.0 125.810 3.480 -999.990 -999.990 1.258 ..P WKT 2011 02 15 09 24 55 31.3200 -97.3300 251.000 30.0 119.830 4.400 -999.990 -999.990 1.198 ..P WKT 2011 02 15 09 29 55 31.3200 -97.3300 251.000 122.0 120.870 3.050 -999.990 -999.990 1.209 ..P WKT 2011 02 15 09 34 55 31.3200 -97.3300 251.000 457.0 127.593 3.480 -999.990 -999.990 1.276 ..P WKT 2011 02 15 09 44 55 31.3200 -97.3300 251.000 30.0 119.262 3.680 -999.990 -999.990 1.193 ..P WKT 2011 02 15 09 49 55 31.3200 -97.3300 251.000 122.0 124.600 3.450 -999.990 -999.990 1.246 ..P WKT 2011 02 15 09 54 55 31.3200 -97.3300 251.000 457.0 130.941 3.210 -999.990 -999.990 1.309 ..P WKT 2011 02 15 09 59 55 31.3200 -97.3300 251.000 30.0 126.251 4.680 -999.990 -999.990 1.263 ..P WKT 2011 02 15 10 04 55 31.3200 -97.3300 251.000 122.0 123.901 3.480 -999.990 -999.990 1.239 ..P WKT 2011 02 15 10 09 55 31.3200 -97.3300 251.000 457.0 126.230 3.430 -999.990 -999.990 1.262 ..P WKT 2011 02 15 10 19 55 31.3200 -97.3300 251.000 30.0 127.880 3.920 -999.990 -999.990 1.279 ..P WKT 2011 02 15 10 24 55 31.3200 -97.3300 251.000 122.0 125.530 3.000 -999.990 -999.990 1.255 ..P WKT 2011 02 15 10 29 55 31.3200 -97.3300 251.000 457.0 132.540 3.470 -999.990 -999.990 1.325 ..P WKT 2011 02 15 10 34 55 31.3200 -97.3300 251.000 30.0 122.500 2.300 -999.990 -999.990 1.225 ..P WKT 2011 02 15 10 39 55 31.3200 -97.3300 251.000 122.0 124.160 4.040 -999.990 -999.990 1.242 ..P WKT 2011 02 15 10 44 55 31.3200 -97.3300 251.000 457.0 134.515 2.470 -999.990 -999.990 1.345 ..P WKT 2011 02 15 10 54 55 31.3200 -97.3300 251.000 30.0 126.493 2.560 -999.990 -999.990 1.265 ..P WKT 2011 02 15 10 59 55 31.3200 -97.3300 251.000 122.0 127.510 2.760 -999.990 -999.990 1.275 ..P WKT 2011 02 15 11 04 55 31.3200 -97.3300 251.000 457.0 131.870 2.870 -999.990 -999.990 1.319 ..P WKT 2011 02 15 11 09 55 31.3200 -97.3300 251.000 30.0 124.025 3.630 -999.990 -999.990 1.240 ..P WKT 2011 02 15 11 14 55 31.3200 -97.3300 251.000 122.0 126.547 3.450 -999.990 -999.990 1.265 ..P WKT 2011 02 15 11 19 55 31.3200 -97.3300 251.000 457.0 135.254 2.590 -999.990 -999.990 1.353 ..P WKT 2011 02 15 11 29 55 31.3200 -97.3300 251.000 30.0 124.981 3.060 -999.990 -999.990 1.250 ..P WKT 2011 02 15 11 34 55 31.3200 -97.3300 251.000 122.0 125.227 4.020 -999.990 -999.990 1.252 ..P WKT 2011 02 15 11 39 55 31.3200 -97.3300 251.000 457.0 136.677 3.480 -999.990 -999.990 1.367 ..P WKT 2011 02 15 11 44 55 31.3200 -97.3300 251.000 30.0 127.393 4.960 -999.990 -999.990 1.274 ..P WKT 2011 02 15 11 49 55 31.3200 -97.3300 251.000 122.0 127.304 3.550 -999.990 -999.990 1.273 ..P WKT 2011 02 15 12 09 55 31.3200 -97.3300 251.000 457.0 130.469 5.410 -999.990 -999.990 1.305 ..P WKT 2011 02 15 12 10 25 31.3200 -97.3300 251.000 457.0 130.872 3.480 -999.990 -999.990 1.309 ..P WKT 2011 02 15 12 10 55 31.3200 -97.3300 251.000 457.0 133.784 3.960 -999.990 -999.990 1.338 ..P WKT 2011 02 15 12 11 25 31.3200 -97.3300 251.000 457.0 135.525 3.610 -999.990 -999.990 1.355 ..P WKT 2011 02 15 12 11 55 31.3200 -97.3300 251.000 457.0 136.931 3.810 -999.990 -999.990 1.369 ..P WKT 2011 02 15 12 12 25 31.3200 -97.3300 251.000 457.0 141.181 3.720 -999.990 -999.990 1.412 ..P WKT 2011 02 15 12 12 55 31.3200 -97.3300 251.000 457.0 132.554 5.990 -999.990 -999.990 1.326 ..P WKT 2011 02 15 12 13 25 31.3200 -97.3300 251.000 457.0 130.449 4.390 -999.990 -999.990 1.304 ..P WKT 2011 02 15 12 13 55 31.3200 -97.3300 251.000 457.0 136.203 3.150 -999.990 -999.990 1.362 ..P WKT 2011 02 15 12 14 25 31.3200 -97.3300 251.000 457.0 134.767 3.050 -999.990 -999.990 1.348 ..P WKT 2011 02 15 12 14 55 31.3200 -97.3300 251.000 457.0 129.150 4.050 -999.990 -999.990 1.292 ..P WKT 2011 02 15 12 19 55 31.3200 -97.3300 251.000 30.0 116.460 3.470 -999.990 -999.990 1.165 ..P WKT 2011 02 15 12 24 55 31.3200 -97.3300 251.000 122.0 118.318 3.990 -999.990 -999.990 1.183 ..P WKT 2011 02 15 12 29 55 31.3200 -97.3300 251.000 457.0 124.858 3.770 -999.990 -999.990 1.249 ..P WKT 2011 02 15 12 34 55 31.3200 -97.3300 251.000 30.0 113.004 4.420 -999.990 -999.990 1.130 ..P WKT 2011 02 15 12 39 55 31.3200 -97.3300 251.000 122.0 121.718 2.750 -999.990 -999.990 1.217 ..P WKT 2011 02 15 12 44 55 31.3200 -97.3300 251.000 457.0 136.620 3.110 -999.990 -999.990 1.366 ..P WKT 2011 02 15 12 54 55 31.3200 -97.3300 251.000 30.0 130.816 2.390 -999.990 -999.990 1.308 ..P WKT 2011 02 15 12 59 55 31.3200 -97.3300 251.000 122.0 133.854 2.130 -999.990 -999.990 1.339 ..P WKT 2011 02 15 13 04 55 31.3200 -97.3300 251.000 457.0 130.874 3.110 -999.990 -999.990 1.309 ..P WKT 2011 02 15 13 09 55 31.3200 -97.3300 251.000 30.0 119.533 3.630 -999.990 -999.990 1.195 ..P WKT 2011 02 15 13 14 55 31.3200 -97.3300 251.000 122.0 124.579 2.750 -999.990 -999.990 1.246 ..P WKT 2011 02 15 13 19 55 31.3200 -97.3300 251.000 457.0 134.641 3.140 -999.990 -999.990 1.346 ..P WKT 2011 02 15 13 29 55 31.3200 -97.3300 251.000 30.0 123.377 2.310 -999.990 -999.990 1.234 ..P WKT 2011 02 15 13 34 55 31.3200 -97.3300 251.000 122.0 132.149 4.850 -999.990 -999.990 1.321 ..P WKT 2011 02 15 13 39 55 31.3200 -97.3300 251.000 457.0 136.239 2.780 -999.990 -999.990 1.362 ..P WKT 2011 02 15 13 44 55 31.3200 -97.3300 251.000 30.0 126.284 2.570 -999.990 -999.990 1.263 ..P WKT 2011 02 15 13 49 55 31.3200 -97.3300 251.000 122.0 131.042 2.610 -999.990 -999.990 1.310 ..P WKT 2011 02 15 13 54 55 31.3200 -97.3300 251.000 457.0 133.460 1.800 -999.990 -999.990 1.335 ..P WKT 2011 02 15 14 04 55 31.3200 -97.3300 251.000 30.0 124.777 1.880 -999.990 -999.990 1.248 ..P WKT 2011 02 15 14 09 55 31.3200 -97.3300 251.000 122.0 126.717 1.980 -999.990 -999.990 1.267 ..P WKT 2011 02 15 14 14 55 31.3200 -97.3300 251.000 457.0 126.651 2.300 -999.990 -999.990 1.267 ..P WKT 2011 02 15 14 19 55 31.3200 -97.3300 251.000 30.0 125.582 2.690 -999.990 -999.990 1.256 ..P WKT 2011 02 15 14 24 55 31.3200 -97.3300 251.000 122.0 123.175 2.350 -999.990 -999.990 1.232 ..P WKT 2011 02 15 14 29 55 31.3200 -97.3300 251.000 457.0 121.103 3.230 -999.990 -999.990 1.211 ..P WKT 2011 02 15 14 39 55 31.3200 -97.3300 251.000 30.0 124.529 4.610 -999.990 -999.990 1.245 ..P WKT 2011 02 15 14 44 55 31.3200 -97.3300 251.000 122.0 136.715 3.920 -999.990 -999.990 1.367 ..P WKT 2011 02 15 14 49 55 31.3200 -97.3300 251.000 457.0 123.824 2.970 -999.990 -999.990 1.238 ..P WKT 2011 02 15 14 54 55 31.3200 -97.3300 251.000 30.0 131.328 4.060 -999.990 -999.990 1.313 ..P WKT 2011 02 15 14 59 55 31.3200 -97.3300 251.000 122.0 130.140 3.120 -999.990 -999.990 1.301 ..P WKT 2011 02 15 15 04 55 31.3200 -97.3300 251.000 457.0 127.949 2.840 -999.990 -999.990 1.279 ..P WKT 2011 02 15 15 14 55 31.3200 -97.3300 251.000 30.0 129.917 2.770 -999.990 -999.990 1.299 ..P WKT 2011 02 15 15 19 55 31.3200 -97.3300 251.000 122.0 125.887 4.010 -999.990 -999.990 1.259 ..P WKT 2011 02 15 15 24 55 31.3200 -97.3300 251.000 457.0 133.725 3.280 -999.990 -999.990 1.337 ..P WKT 2011 02 15 15 29 55 31.3200 -97.3300 251.000 30.0 130.197 2.850 -999.990 -999.990 1.302 ..P WKT 2011 02 15 15 34 55 31.3200 -97.3300 251.000 122.0 133.856 3.650 -999.990 -999.990 1.339 ..P WKT 2011 02 15 15 39 55 31.3200 -97.3300 251.000 457.0 129.491 2.820 -999.990 -999.990 1.295 ..P WKT 2011 02 15 15 49 55 31.3200 -97.3300 251.000 30.0 134.254 2.700 -999.990 -999.990 1.343 ..P WKT 2011 02 15 15 54 55 31.3200 -97.3300 251.000 122.0 134.355 3.240 -999.990 -999.990 1.344 ..P WKT 2011 02 15 15 59 55 31.3200 -97.3300 251.000 457.0 140.306 3.750 -999.990 -999.990 1.403 ..P WKT 2011 02 15 16 04 55 31.3200 -97.3300 251.000 30.0 133.219 3.650 -999.990 -999.990 1.332 ..P WKT 2011 02 15 16 09 55 31.3200 -97.3300 251.000 122.0 144.854 5.540 -999.990 -999.990 1.449 ..P WKT 2011 02 15 16 14 55 31.3200 -97.3300 251.000 457.0 138.771 5.720 -999.990 -999.990 1.388 ..P WKT 2011 02 15 16 24 55 31.3200 -97.3300 251.000 30.0 127.941 4.930 -999.990 -999.990 1.279 ..P WKT 2011 02 15 16 29 55 31.3200 -97.3300 251.000 122.0 125.367 3.750 -999.990 -999.990 1.254 ..P WKT 2011 02 15 16 34 55 31.3200 -97.3300 251.000 457.0 124.298 3.470 -999.990 -999.990 1.243 ..P WKT 2011 02 15 16 39 55 31.3200 -97.3300 251.000 30.0 126.405 3.750 -999.990 -999.990 1.264 ..P WKT 2011 02 15 16 44 55 31.3200 -97.3300 251.000 122.0 127.844 4.340 -999.990 -999.990 1.278 ..P WKT 2011 02 15 16 49 55 31.3200 -97.3300 251.000 457.0 128.111 2.950 -999.990 -999.990 1.281 ..P WKT 2011 02 15 17 04 55 31.3200 -97.3300 251.000 30.0 131.936 3.640 -999.990 -999.990 1.319 ..P WKT 2011 02 15 17 09 55 31.3200 -97.3300 251.000 122.0 139.982 4.260 -999.990 -999.990 1.400 ..P WKT 2011 02 15 17 14 55 31.3200 -97.3300 251.000 457.0 135.660 5.650 -999.990 -999.990 1.357 ..P WKT 2011 02 15 17 19 55 31.3200 -97.3300 251.000 30.0 132.007 2.780 -999.990 -999.990 1.320 ..P WKT 2011 02 15 17 24 55 31.3200 -97.3300 251.000 122.0 126.347 3.080 -999.990 -999.990 1.263 ..P WKT 2011 02 15 17 29 55 31.3200 -97.3300 251.000 457.0 131.719 3.200 -999.990 -999.990 1.317 ..P WKT 2011 02 15 17 39 55 31.3200 -97.3300 251.000 30.0 137.310 3.830 -999.990 -999.990 1.373 ..P WKT 2011 02 15 17 44 55 31.3200 -97.3300 251.000 122.0 138.868 3.220 -999.990 -999.990 1.389 ..P WKT 2011 02 15 17 49 55 31.3200 -97.3300 251.000 457.0 144.101 3.590 -999.990 -999.990 1.441 ..P WKT 2011 02 15 17 54 55 31.3200 -97.3300 251.000 30.0 135.966 3.000 -999.990 -999.990 1.360 ..P WKT 2011 02 15 17 59 55 31.3200 -97.3300 251.000 122.0 136.854 2.910 -999.990 -999.990 1.369 ..P WKT 2011 02 15 18 04 55 31.3200 -97.3300 251.000 457.0 133.732 3.540 -999.990 -999.990 1.337 ..P WKT 2011 02 15 18 14 55 31.3200 -97.3300 251.000 30.0 130.378 3.210 -999.990 -999.990 1.304 ..P WKT 2011 02 15 18 19 55 31.3200 -97.3300 251.000 122.0 142.510 2.740 -999.990 -999.990 1.425 ..P WKT 2011 02 15 18 24 55 31.3200 -97.3300 251.000 457.0 144.950 3.500 -999.990 -999.990 1.450 ..P WKT 2011 02 15 18 29 55 31.3200 -97.3300 251.000 30.0 135.693 3.010 -999.990 -999.990 1.357 ..P WKT 2011 02 15 18 34 55 31.3200 -97.3300 251.000 122.0 141.475 3.080 -999.990 -999.990 1.415 ..P WKT 2011 02 15 18 39 55 31.3200 -97.3300 251.000 457.0 138.568 2.990 -999.990 -999.990 1.386 ..P WKT 2011 02 15 18 49 55 31.3200 -97.3300 251.000 30.0 144.977 3.020 -999.990 -999.990 1.450 ..P WKT 2011 02 15 18 54 55 31.3200 -97.3300 251.000 122.0 142.594 3.040 -999.990 -999.990 1.426 ..P WKT 2011 02 15 18 59 55 31.3200 -97.3300 251.000 457.0 145.058 4.580 -999.990 -999.990 1.451 ..P WKT 2011 02 15 19 04 55 31.3200 -97.3300 251.000 30.0 148.024 4.710 -999.990 -999.990 1.480 ..P WKT 2011 02 15 19 09 55 31.3200 -97.3300 251.000 122.0 146.645 3.870 -999.990 -999.990 1.466 ..P WKT 2011 02 15 19 14 55 31.3200 -97.3300 251.000 457.0 142.259 3.600 -999.990 -999.990 1.423 ..P WKT 2011 02 15 19 24 55 31.3200 -97.3300 251.000 30.0 146.780 3.630 -999.990 -999.990 1.468 ..P WKT 2011 02 15 19 29 55 31.3200 -97.3300 251.000 122.0 147.335 4.110 -999.990 -999.990 1.473 ..P WKT 2011 02 15 19 34 55 31.3200 -97.3300 251.000 457.0 140.371 4.370 -999.990 -999.990 1.404 ..P WKT 2011 02 15 19 39 55 31.3200 -97.3300 251.000 30.0 140.591 3.890 -999.990 -999.990 1.406 ..P WKT 2011 02 15 19 44 55 31.3200 -97.3300 251.000 122.0 139.140 3.600 -999.990 -999.990 1.391 ..P WKT 2011 02 15 19 49 55 31.3200 -97.3300 251.000 457.0 139.026 3.800 -999.990 -999.990 1.390 ..P WKT 2011 02 15 19 59 55 31.3200 -97.3300 251.000 30.0 143.691 4.930 -999.990 -999.990 1.437 ..P WKT 2011 02 15 20 04 55 31.3200 -97.3300 251.000 122.0 144.961 5.390 -999.990 -999.990 1.450 ..P WKT 2011 02 15 20 09 55 31.3200 -97.3300 251.000 457.0 142.222 4.410 -999.990 -999.990 1.422 ..P WKT 2011 02 15 20 14 55 31.3200 -97.3300 251.000 30.0 139.984 4.490 -999.990 -999.990 1.400 ..P WKT 2011 02 15 20 19 55 31.3200 -97.3300 251.000 122.0 142.090 4.110 -999.990 -999.990 1.421 ..P WKT 2011 02 15 20 24 55 31.3200 -97.3300 251.000 457.0 136.344 3.800 -999.990 -999.990 1.363 ..P WKT 2011 02 15 20 34 55 31.3200 -97.3300 251.000 30.0 138.025 3.640 -999.990 -999.990 1.380 ..P WKT 2011 02 15 20 39 55 31.3200 -97.3300 251.000 122.0 138.436 3.280 -999.990 -999.990 1.384 ..P WKT 2011 02 15 20 44 55 31.3200 -97.3300 251.000 457.0 134.003 3.370 -999.990 -999.990 1.340 ..P WKT 2011 02 15 20 49 55 31.3200 -97.3300 251.000 30.0 142.431 3.210 -999.990 -999.990 1.424 ..P WKT 2011 02 15 20 54 55 31.3200 -97.3300 251.000 122.0 139.836 3.290 -999.990 -999.990 1.398 ..P WKT 2011 02 15 20 59 55 31.3200 -97.3300 251.000 457.0 142.585 3.020 -999.990 -999.990 1.426 ..P WKT 2011 02 15 21 09 55 31.3200 -97.3300 251.000 30.0 140.401 2.940 -999.990 -999.990 1.404 ..P WKT 2011 02 15 21 14 55 31.3200 -97.3300 251.000 122.0 151.836 3.410 -999.990 -999.990 1.518 ..P WKT 2011 02 15 21 19 55 31.3200 -97.3300 251.000 457.0 143.562 3.820 -999.990 -999.990 1.436 ..P WKT 2011 02 15 21 24 55 31.3200 -97.3300 251.000 30.0 139.630 3.850 -999.990 -999.990 1.396 ..P WKT 2011 02 15 21 29 55 31.3200 -97.3300 251.000 122.0 140.375 4.610 -999.990 -999.990 1.404 ..P WKT 2011 02 15 21 34 55 31.3200 -97.3300 251.000 457.0 136.778 4.200 -999.990 -999.990 1.368 ..P WKT 2011 02 15 21 44 55 31.3200 -97.3300 251.000 30.0 134.832 4.360 -999.990 -999.990 1.348 ..P WKT 2011 02 15 21 49 55 31.3200 -97.3300 251.000 122.0 136.818 5.100 -999.990 -999.990 1.368 ..P WKT 2011 02 15 21 54 55 31.3200 -97.3300 251.000 457.0 139.472 4.100 -999.990 -999.990 1.395 ..P WKT 2011 02 15 21 59 55 31.3200 -97.3300 251.000 30.0 129.766 4.610 -999.990 -999.990 1.298 ..P WKT 2011 02 15 22 04 55 31.3200 -97.3300 251.000 122.0 138.099 4.690 -999.990 -999.990 1.381 ..P WKT 2011 02 15 22 09 55 31.3200 -97.3300 251.000 457.0 127.725 3.500 -999.990 -999.990 1.277 ..P WKT 2011 02 15 22 19 55 31.3200 -97.3300 251.000 30.0 130.266 3.660 -999.990 -999.990 1.303 ..P WKT 2011 02 15 22 24 55 31.3200 -97.3300 251.000 122.0 133.826 3.320 -999.990 -999.990 1.338 ..P WKT 2011 02 15 22 29 55 31.3200 -97.3300 251.000 457.0 124.026 3.870 -999.990 -999.990 1.240 ..P WKT 2011 02 15 22 34 55 31.3200 -97.3300 251.000 30.0 128.254 4.190 -999.990 -999.990 1.283 ..P WKT 2011 02 15 22 39 55 31.3200 -97.3300 251.000 122.0 133.818 4.060 -999.990 -999.990 1.338 ..P WKT 2011 02 15 22 44 55 31.3200 -97.3300 251.000 457.0 139.716 3.360 -999.990 -999.990 1.397 ..P WKT 2011 02 15 22 54 55 31.3200 -97.3300 251.000 30.0 135.028 3.770 -999.990 -999.990 1.350 ..P WKT 2011 02 15 22 59 55 31.3200 -97.3300 251.000 122.0 136.464 3.970 -999.990 -999.990 1.365 ..P WKT 2011 02 15 23 04 55 31.3200 -97.3300 251.000 457.0 132.223 4.330 -999.990 -999.990 1.322 ..P WKT 2011 02 15 23 09 55 31.3200 -97.3300 251.000 30.0 134.495 4.880 -999.990 -999.990 1.345 ..P WKT 2011 02 15 23 14 55 31.3200 -97.3300 251.000 122.0 139.105 3.660 -999.990 -999.990 1.391 ..P WKT 2011 02 15 23 19 55 31.3200 -97.3300 251.000 457.0 131.358 3.460 -999.990 -999.990 1.314 ..P WKT 2011 02 15 23 29 55 31.3200 -97.3300 251.000 30.0 129.916 4.270 -999.990 -999.990 1.299 ..P WKT 2011 02 15 23 34 55 31.3200 -97.3300 251.000 122.0 128.541 4.170 -999.990 -999.990 1.285 ..P WKT 2011 02 15 23 39 55 31.3200 -97.3300 251.000 457.0 130.005 4.150 -999.990 -999.990 1.300 ..P WKT 2011 02 15 23 44 55 31.3200 -97.3300 251.000 30.0 127.461 4.710 -999.990 -999.990 1.275 ..P WKT 2011 02 15 23 49 55 31.3200 -97.3300 251.000 122.0 133.433 4.250 -999.990 -999.990 1.334 ..P WKT 2011 02 16 00 09 55 31.3200 -97.3300 251.000 457.0 130.229 4.560 -999.990 -999.990 1.302 ..P WKT 2011 02 16 00 10 25 31.3200 -97.3300 251.000 457.0 126.213 4.640 -999.990 -999.990 1.262 ..P WKT 2011 02 16 00 10 55 31.3200 -97.3300 251.000 457.0 131.712 4.390 -999.990 -999.990 1.317 ..P WKT 2011 02 16 00 11 25 31.3200 -97.3300 251.000 457.0 129.030 4.260 -999.990 -999.990 1.290 ..P WKT 2011 02 16 00 11 55 31.3200 -97.3300 251.000 457.0 128.519 4.340 -999.990 -999.990 1.285 ..P WKT 2011 02 16 00 12 25 31.3200 -97.3300 251.000 457.0 131.181 4.660 -999.990 -999.990 1.312 ..P WKT 2011 02 16 00 12 55 31.3200 -97.3300 251.000 457.0 136.846 4.280 -999.990 -999.990 1.368 ..P WKT 2011 02 16 00 13 25 31.3200 -97.3300 251.000 457.0 131.661 4.100 -999.990 -999.990 1.317 ..P WKT 2011 02 16 00 13 55 31.3200 -97.3300 251.000 457.0 127.978 4.160 -999.990 -999.990 1.280 ..P WKT 2011 02 16 00 14 25 31.3200 -97.3300 251.000 457.0 127.300 3.920 -999.990 -999.990 1.273 ..P WKT 2011 02 16 00 14 55 31.3200 -97.3300 251.000 457.0 128.792 4.380 -999.990 -999.990 1.288 ..P WKT 2011 02 16 00 19 55 31.3200 -97.3300 251.000 30.0 129.359 4.580 -999.990 -999.990 1.294 ..P WKT 2011 02 16 00 24 55 31.3200 -97.3300 251.000 122.0 136.602 5.310 -999.990 -999.990 1.366 ..P WKT 2011 02 16 00 29 55 31.3200 -97.3300 251.000 457.0 127.321 3.520 -999.990 -999.990 1.273 ..P WKT 2011 02 16 00 34 55 31.3200 -97.3300 251.000 30.0 137.235 4.750 -999.990 -999.990 1.372 ..P WKT 2011 02 16 00 39 55 31.3200 -97.3300 251.000 122.0 135.464 3.940 -999.990 -999.990 1.355 ..P WKT 2011 02 16 00 44 55 31.3200 -97.3300 251.000 457.0 129.354 3.460 -999.990 -999.990 1.294 ..P WKT 2011 02 16 00 54 55 31.3200 -97.3300 251.000 30.0 133.727 3.810 -999.990 -999.990 1.337 ..P WKT 2011 02 16 00 59 55 31.3200 -97.3300 251.000 122.0 132.193 3.770 -999.990 -999.990 1.322 ..P WKT 2011 02 16 01 04 55 31.3200 -97.3300 251.000 457.0 128.990 3.820 -999.990 -999.990 1.290 ..P WKT 2011 02 16 01 09 55 31.3200 -97.3300 251.000 30.0 129.459 4.450 -999.990 -999.990 1.295 ..P WKT 2011 02 16 01 14 55 31.3200 -97.3300 251.000 122.0 125.589 4.020 -999.990 -999.990 1.256 ..P WKT 2011 02 16 01 19 55 31.3200 -97.3300 251.000 457.0 130.729 4.790 -999.990 -999.990 1.307 ..P WKT 2011 02 16 01 29 55 31.3200 -97.3300 251.000 30.0 129.854 3.840 -999.990 -999.990 1.299 ..P WKT 2011 02 16 01 34 55 31.3200 -97.3300 251.000 122.0 131.847 4.360 -999.990 -999.990 1.318 ..P WKT 2011 02 16 01 39 55 31.3200 -97.3300 251.000 457.0 126.835 4.140 -999.990 -999.990 1.268 ..P WKT 2011 02 16 01 44 55 31.3200 -97.3300 251.000 30.0 141.171 5.510 -999.990 -999.990 1.412 ..P WKT 2011 02 16 01 49 55 31.3200 -97.3300 251.000 122.0 135.492 4.120 -999.990 -999.990 1.355 ..P WKT 2011 02 16 01 54 55 31.3200 -97.3300 251.000 457.0 153.496 3.650 -999.990 -999.990 1.535 ..P WKT 2011 02 16 02 04 55 31.3200 -97.3300 251.000 30.0 141.136 4.490 -999.990 -999.990 1.411 ..P WKT 2011 02 16 02 09 55 31.3200 -97.3300 251.000 122.0 126.118 3.720 -999.990 -999.990 1.261 ..P WKT 2011 02 16 02 14 55 31.3200 -97.3300 251.000 457.0 164.131 4.480 -999.990 -999.990 1.641 ..P WKT 2011 02 16 02 19 55 31.3200 -97.3300 251.000 30.0 136.440 3.640 -999.990 -999.990 1.364 ..P WKT 2011 02 16 02 24 55 31.3200 -97.3300 251.000 122.0 123.425 3.750 -999.990 -999.990 1.234 ..P WKT 2011 02 16 02 29 55 31.3200 -97.3300 251.000 457.0 129.086 4.460 -999.990 -999.990 1.291 ..P WKT 2011 02 16 02 39 55 31.3200 -97.3300 251.000 30.0 129.736 3.860 -999.990 -999.990 1.297 ..P WKT 2011 02 16 02 44 55 31.3200 -97.3300 251.000 122.0 126.393 3.970 -999.990 -999.990 1.264 ..P WKT 2011 02 16 02 49 55 31.3200 -97.3300 251.000 457.0 128.719 4.380 -999.990 -999.990 1.287 ..P WKT 2011 02 16 02 54 55 31.3200 -97.3300 251.000 30.0 147.382 4.410 -999.990 -999.990 1.474 ..P WKT 2011 02 16 02 59 55 31.3200 -97.3300 251.000 122.0 135.704 4.390 -999.990 -999.990 1.357 ..P WKT 2011 02 16 03 04 55 31.3200 -97.3300 251.000 457.0 127.528 4.340 -999.990 -999.990 1.275 ..P WKT 2011 02 16 03 14 55 31.3200 -97.3300 251.000 30.0 127.845 4.480 -999.990 -999.990 1.278 ..P WKT 2011 02 16 03 19 55 31.3200 -97.3300 251.000 122.0 130.337 5.020 -999.990 -999.990 1.303 ..P WKT 2011 02 16 03 24 55 31.3200 -97.3300 251.000 457.0 129.161 4.920 -999.990 -999.990 1.292 ..P WKT 2011 02 16 03 29 55 31.3200 -97.3300 251.000 30.0 123.320 5.220 -999.990 -999.990 1.233 ..P WKT 2011 02 16 03 34 55 31.3200 -97.3300 251.000 122.0 127.812 5.730 -999.990 -999.990 1.278 ..P WKT 2011 02 16 03 39 55 31.3200 -97.3300 251.000 457.0 124.304 6.620 -999.990 -999.990 1.243 ..P WKT 2011 02 16 03 49 55 31.3200 -97.3300 251.000 30.0 125.977 5.620 -999.990 -999.990 1.260 ..P WKT 2011 02 16 03 54 55 31.3200 -97.3300 251.000 122.0 124.493 4.620 -999.990 -999.990 1.245 ..P WKT 2011 02 16 03 59 55 31.3200 -97.3300 251.000 457.0 119.177 5.210 -999.990 -999.990 1.192 ..P WKT 2011 02 16 04 04 55 31.3200 -97.3300 251.000 30.0 121.359 3.840 -999.990 -999.990 1.214 ..P WKT 2011 02 16 04 09 55 31.3200 -97.3300 251.000 122.0 119.542 4.120 -999.990 -999.990 1.195 ..P WKT 2011 02 16 04 14 55 31.3200 -97.3300 251.000 457.0 127.054 3.750 -999.990 -999.990 1.271 ..P WKT 2011 02 16 04 24 55 31.3200 -97.3300 251.000 30.0 120.827 3.480 -999.990 -999.990 1.208 ..P WKT 2011 02 16 04 29 55 31.3200 -97.3300 251.000 122.0 124.079 4.960 -999.990 -999.990 1.241 ..P WKT 2011 02 16 04 34 55 31.3200 -97.3300 251.000 457.0 135.492 4.530 -999.990 -999.990 1.355 ..P WKT 2011 02 16 04 39 55 31.3200 -97.3300 251.000 30.0 115.925 3.510 -999.990 -999.990 1.159 ..P WKT 2011 02 16 04 44 55 31.3200 -97.3300 251.000 122.0 120.010 3.730 -999.990 -999.990 1.200 ..P WKT 2011 02 16 04 49 55 31.3200 -97.3300 251.000 457.0 123.095 3.940 -999.990 -999.990 1.231 ..P WKT 2011 02 16 05 04 55 31.3200 -97.3300 251.000 30.0 119.919 3.940 -999.990 -999.990 1.199 ..P WKT 2011 02 16 05 09 55 31.3200 -97.3300 251.000 122.0 119.786 4.050 -999.990 -999.990 1.198 ..P WKT 2011 02 16 05 14 55 31.3200 -97.3300 251.000 457.0 120.319 4.860 -999.990 -999.990 1.203 ..P WKT 2011 02 16 05 19 55 31.3200 -97.3300 251.000 30.0 120.187 4.460 -999.990 -999.990 1.202 ..P WKT 2011 02 16 05 24 55 31.3200 -97.3300 251.000 122.0 119.387 4.110 -999.990 -999.990 1.194 ..P WKT 2011 02 16 05 29 55 31.3200 -97.3300 251.000 457.0 120.587 4.170 -999.990 -999.990 1.206 ..P WKT 2011 02 16 05 39 55 31.3200 -97.3300 251.000 30.0 127.057 4.090 -999.990 -999.990 1.271 ..P WKT 2011 02 16 05 44 55 31.3200 -97.3300 251.000 122.0 125.336 4.560 -999.990 -999.990 1.253 ..P WKT 2011 02 16 05 49 55 31.3200 -97.3300 251.000 457.0 119.954 5.210 -999.990 -999.990 1.200 ..P WKT 2011 02 16 05 54 55 31.3200 -97.3300 251.000 30.0 116.571 3.920 -999.990 -999.990 1.166 ..P WKT 2011 02 16 05 59 55 31.3200 -97.3300 251.000 122.0 116.848 3.410 -999.990 -999.990 1.168 ..P WKT 2011 02 16 06 04 55 31.3200 -97.3300 251.000 457.0 117.459 3.380 -999.990 -999.990 1.175 ..P WKT 2011 02 16 06 14 55 31.3200 -97.3300 251.000 30.0 111.547 3.760 -999.990 -999.990 1.115 ..P WKT 2011 02 16 06 19 55 31.3200 -97.3300 251.000 122.0 111.016 3.580 -999.990 -999.990 1.110 ..P WKT 2011 02 16 06 24 55 31.3200 -97.3300 251.000 457.0 111.152 3.960 -999.990 -999.990 1.112 ..P WKT 2011 02 16 06 29 55 31.3200 -97.3300 251.000 30.0 109.456 4.110 -999.990 -999.990 1.095 ..P WKT 2011 02 16 06 34 55 31.3200 -97.3300 251.000 122.0 109.425 4.360 -999.990 -999.990 1.094 ..P WKT 2011 02 16 06 39 55 31.3200 -97.3300 251.000 457.0 107.730 4.100 -999.990 -999.990 1.077 ..P WKT 2011 02 16 06 49 55 31.3200 -97.3300 251.000 30.0 113.419 4.350 -999.990 -999.990 1.134 ..P WKT 2011 02 16 06 54 55 31.3200 -97.3300 251.000 122.0 115.312 4.490 -999.990 -999.990 1.153 ..P WKT 2011 02 16 06 59 55 31.3200 -97.3300 251.000 457.0 113.546 4.550 -999.990 -999.990 1.135 ..P WKT 2011 02 16 07 04 55 31.3200 -97.3300 251.000 30.0 115.439 4.230 -999.990 -999.990 1.154 ..P WKT 2011 02 16 07 09 55 31.3200 -97.3300 251.000 122.0 116.668 3.890 -999.990 -999.990 1.167 ..P WKT 2011 02 16 07 14 55 31.3200 -97.3300 251.000 457.0 113.737 4.130 -999.990 -999.990 1.137 ..P WKT 2011 02 16 07 24 55 31.3200 -97.3300 251.000 30.0 110.848 3.890 -999.990 -999.990 1.108 ..P WKT 2011 02 16 07 29 55 31.3200 -97.3300 251.000 122.0 113.881 4.710 -999.990 -999.990 1.139 ..P WKT 2011 02 16 07 34 55 31.3200 -97.3300 251.000 457.0 115.085 4.310 -999.990 -999.990 1.151 ..P WKT 2011 02 16 07 39 55 31.3200 -97.3300 251.000 30.0 112.464 4.270 -999.990 -999.990 1.125 ..P WKT 2011 02 16 07 44 55 31.3200 -97.3300 251.000 122.0 110.342 4.170 -999.990 -999.990 1.103 ..P WKT 2011 02 16 07 49 55 31.3200 -97.3300 251.000 457.0 112.212 3.700 -999.990 -999.990 1.122 ..P WKT 2011 02 16 07 59 55 31.3200 -97.3300 251.000 30.0 115.355 3.760 -999.990 -999.990 1.154 ..P WKT 2011 02 16 08 04 55 31.3200 -97.3300 251.000 122.0 114.469 3.510 -999.990 -999.990 1.145 ..P WKT 2011 02 16 08 09 55 31.3200 -97.3300 251.000 457.0 112.750 3.740 -999.990 -999.990 1.127 ..P WKT 2011 02 16 08 14 55 31.3200 -97.3300 251.000 30.0 114.025 4.070 -999.990 -999.990 1.140 ..P WKT 2011 02 16 08 19 55 31.3200 -97.3300 251.000 122.0 117.794 4.600 -999.990 -999.990 1.178 ..P WKT 2011 02 16 08 24 55 31.3200 -97.3300 251.000 457.0 115.411 4.910 -999.990 -999.990 1.154 ..P WKT 2011 02 16 08 34 55 31.3200 -97.3300 251.000 30.0 111.193 4.990 -999.990 -999.990 1.112 ..P WKT 2011 02 16 08 39 55 31.3200 -97.3300 251.000 122.0 115.507 4.150 -999.990 -999.990 1.155 ..P WKT 2011 02 16 08 44 55 31.3200 -97.3300 251.000 457.0 119.155 4.450 -999.990 -999.990 1.192 ..P WKT 2011 02 16 08 49 55 31.3200 -97.3300 251.000 30.0 112.168 4.670 -999.990 -999.990 1.122 ..P WKT 2011 02 16 08 54 55 31.3200 -97.3300 251.000 122.0 117.146 4.390 -999.990 -999.990 1.171 ..P WKT 2011 02 16 08 59 55 31.3200 -97.3300 251.000 457.0 124.781 4.940 -999.990 -999.990 1.248 ..P WKT 2011 02 16 09 09 55 31.3200 -97.3300 251.000 30.0 113.324 4.690 -999.990 -999.990 1.133 ..P WKT 2011 02 16 09 14 55 31.3200 -97.3300 251.000 122.0 118.823 4.290 -999.990 -999.990 1.188 ..P WKT 2011 02 16 09 19 55 31.3200 -97.3300 251.000 457.0 119.005 4.160 -999.990 -999.990 1.190 ..P WKT 2011 02 16 09 24 55 31.3200 -97.3300 251.000 30.0 115.532 3.970 -999.990 -999.990 1.155 ..P WKT 2011 02 16 09 29 55 31.3200 -97.3300 251.000 122.0 116.711 4.580 -999.990 -999.990 1.167 ..P WKT 2011 02 16 09 34 55 31.3200 -97.3300 251.000 457.0 116.561 4.400 -999.990 -999.990 1.166 ..P WKT 2011 02 16 09 44 55 31.3200 -97.3300 251.000 30.0 117.969 3.740 -999.990 -999.990 1.180 ..P WKT 2011 02 16 09 49 55 31.3200 -97.3300 251.000 122.0 119.528 4.000 -999.990 -999.990 1.195 ..P WKT 2011 02 16 09 54 55 31.3200 -97.3300 251.000 457.0 125.404 4.470 -999.990 -999.990 1.254 ..P WKT 2011 02 16 09 59 55 31.3200 -97.3300 251.000 30.0 113.343 4.290 -999.990 -999.990 1.133 ..P WKT 2011 02 16 10 04 55 31.3200 -97.3300 251.000 122.0 115.234 4.970 -999.990 -999.990 1.152 ..P WKT 2011 02 16 10 09 55 31.3200 -97.3300 251.000 457.0 119.780 4.820 -999.990 -999.990 1.198 ..P WKT 2011 02 16 10 19 55 31.3200 -97.3300 251.000 30.0 110.347 4.580 -999.990 -999.990 1.103 ..P WKT 2011 02 16 10 24 55 31.3200 -97.3300 251.000 122.0 116.958 4.590 -999.990 -999.990 1.170 ..P WKT 2011 02 16 10 29 55 31.3200 -97.3300 251.000 457.0 120.246 4.540 -999.990 -999.990 1.202 ..P WKT 2011 02 16 10 34 55 31.3200 -97.3300 251.000 30.0 107.929 5.430 -999.990 -999.990 1.079 ..P WKT 2011 02 16 10 39 55 31.3200 -97.3300 251.000 122.0 120.183 4.300 -999.990 -999.990 1.202 ..P WKT 2011 02 16 10 44 55 31.3200 -97.3300 251.000 457.0 117.993 4.330 -999.990 -999.990 1.180 ..P WKT 2011 02 16 10 54 55 31.3200 -97.3300 251.000 30.0 121.155 4.910 -999.990 -999.990 1.212 ..P WKT 2011 02 16 10 59 55 31.3200 -97.3300 251.000 122.0 111.734 4.620 -999.990 -999.990 1.117 ..P WKT 2011 02 16 11 04 55 31.3200 -97.3300 251.000 457.0 121.732 4.290 -999.990 -999.990 1.217 ..P WKT 2011 02 16 11 09 55 31.3200 -97.3300 251.000 30.0 112.145 4.750 -999.990 -999.990 1.121 ..P WKT 2011 02 16 11 14 55 31.3200 -97.3300 251.000 122.0 117.330 3.730 -999.990 -999.990 1.173 ..P WKT 2011 02 16 11 19 55 31.3200 -97.3300 251.000 457.0 116.374 4.440 -999.990 -999.990 1.164 ..P WKT 2011 02 16 11 29 55 31.3200 -97.3300 251.000 30.0 115.763 4.070 -999.990 -999.990 1.158 ..P WKT 2011 02 16 11 34 55 31.3200 -97.3300 251.000 122.0 112.623 3.740 -999.990 -999.990 1.126 ..P WKT 2011 02 16 11 39 55 31.3200 -97.3300 251.000 457.0 115.125 4.110 -999.990 -999.990 1.151 ..P WKT 2011 02 16 11 44 55 31.3200 -97.3300 251.000 30.0 120.282 4.230 -999.990 -999.990 1.203 ..P WKT 2011 02 16 11 49 55 31.3200 -97.3300 251.000 122.0 115.980 4.380 -999.990 -999.990 1.160 ..P WKT 2011 02 16 12 09 55 31.3200 -97.3300 251.000 457.0 117.436 5.290 -999.990 -999.990 1.174 ..P WKT 2011 02 16 12 10 25 31.3200 -97.3300 251.000 457.0 116.611 3.930 -999.990 -999.990 1.166 ..P WKT 2011 02 16 12 10 55 31.3200 -97.3300 251.000 457.0 120.764 4.030 -999.990 -999.990 1.208 ..P WKT 2011 02 16 12 11 25 31.3200 -97.3300 251.000 457.0 121.433 3.860 -999.990 -999.990 1.214 ..P WKT 2011 02 16 12 11 55 31.3200 -97.3300 251.000 457.0 117.622 3.770 -999.990 -999.990 1.176 ..P WKT 2011 02 16 12 12 25 31.3200 -97.3300 251.000 457.0 116.300 3.820 -999.990 -999.990 1.163 ..P WKT 2011 02 16 12 12 55 31.3200 -97.3300 251.000 457.0 117.134 3.890 -999.990 -999.990 1.171 ..P WKT 2011 02 16 12 13 25 31.3200 -97.3300 251.000 457.0 118.468 3.810 -999.990 -999.990 1.185 ..P WKT 2011 02 16 12 13 55 31.3200 -97.3300 251.000 457.0 117.643 3.900 -999.990 -999.990 1.176 ..P WKT 2011 02 16 12 14 25 31.3200 -97.3300 251.000 457.0 115.657 3.900 -999.990 -999.990 1.157 ..P WKT 2011 02 16 12 14 55 31.3200 -97.3300 251.000 457.0 116.657 4.450 -999.990 -999.990 1.167 ..P WKT 2011 02 16 12 19 55 31.3200 -97.3300 251.000 30.0 115.051 5.020 -999.990 -999.990 1.151 ..P WKT 2011 02 16 12 24 55 31.3200 -97.3300 251.000 122.0 114.438 3.710 -999.990 -999.990 1.144 ..P WKT 2011 02 16 12 29 55 31.3200 -97.3300 251.000 457.0 123.451 4.010 -999.990 -999.990 1.235 ..P WKT 2011 02 16 12 34 55 31.3200 -97.3300 251.000 30.0 118.193 3.780 -999.990 -999.990 1.182 ..P WKT 2011 02 16 12 39 55 31.3200 -97.3300 251.000 122.0 124.219 3.980 -999.990 -999.990 1.242 ..P WKT 2011 02 16 12 44 55 31.3200 -97.3300 251.000 457.0 117.301 4.290 -999.990 -999.990 1.173 ..P WKT 2011 02 16 12 54 55 31.3200 -97.3300 251.000 30.0 122.489 5.170 -999.990 -999.990 1.225 ..P WKT 2011 02 16 12 59 55 31.3200 -97.3300 251.000 122.0 119.327 3.800 -999.990 -999.990 1.193 ..P WKT 2011 02 16 13 04 55 31.3200 -97.3300 251.000 457.0 123.468 4.660 -999.990 -999.990 1.235 ..P WKT 2011 02 16 13 09 55 31.3200 -97.3300 251.000 30.0 125.950 4.680 -999.990 -999.990 1.260 ..P WKT 2011 02 16 13 14 55 31.3200 -97.3300 251.000 122.0 117.475 3.960 -999.990 -999.990 1.175 ..P WKT 2011 02 16 13 19 55 31.3200 -97.3300 251.000 457.0 120.952 4.410 -999.990 -999.990 1.210 ..P WKT 2011 02 16 13 29 55 31.3200 -97.3300 251.000 30.0 115.622 4.560 -999.990 -999.990 1.156 ..P WKT 2011 02 16 13 34 55 31.3200 -97.3300 251.000 122.0 119.101 3.620 -999.990 -999.990 1.191 ..P WKT 2011 02 16 13 39 55 31.3200 -97.3300 251.000 457.0 122.247 3.720 -999.990 -999.990 1.222 ..P WKT 2011 02 16 13 44 55 31.3200 -97.3300 251.000 30.0 118.751 4.470 -999.990 -999.990 1.188 ..P WKT 2011 02 16 13 49 55 31.3200 -97.3300 251.000 122.0 125.552 4.400 -999.990 -999.990 1.256 ..P WKT 2011 02 16 13 54 55 31.3200 -97.3300 251.000 457.0 121.060 4.550 -999.990 -999.990 1.211 ..P WKT 2011 02 16 14 04 55 31.3200 -97.3300 251.000 30.0 125.764 5.010 -999.990 -999.990 1.258 ..P WKT 2011 02 16 14 09 55 31.3200 -97.3300 251.000 122.0 119.349 4.010 -999.990 -999.990 1.193 ..P WKT 2011 02 16 14 14 55 31.3200 -97.3300 251.000 457.0 116.090 4.310 -999.990 -999.990 1.161 ..P WKT 2011 02 16 14 19 55 31.3200 -97.3300 251.000 30.0 117.148 4.420 -999.990 -999.990 1.171 ..P WKT 2011 02 16 14 24 55 31.3200 -97.3300 251.000 122.0 118.540 3.810 -999.990 -999.990 1.185 ..P WKT 2011 02 16 14 29 55 31.3200 -97.3300 251.000 457.0 117.107 4.040 -999.990 -999.990 1.171 ..P WKT 2011 02 16 14 39 55 31.3200 -97.3300 251.000 30.0 125.136 4.120 -999.990 -999.990 1.251 ..P WKT 2011 02 16 14 44 55 31.3200 -97.3300 251.000 122.0 123.300 3.850 -999.990 -999.990 1.233 ..P WKT 2011 02 16 14 49 55 31.3200 -97.3300 251.000 457.0 124.620 3.560 -999.990 -999.990 1.246 ..P WKT 2011 02 16 14 54 55 31.3200 -97.3300 251.000 30.0 127.105 4.310 -999.990 -999.990 1.271 ..P WKT 2011 02 16 14 59 55 31.3200 -97.3300 251.000 122.0 125.601 4.280 -999.990 -999.990 1.256 ..P WKT 2011 02 16 15 04 55 31.3200 -97.3300 251.000 457.0 120.275 3.770 -999.990 -999.990 1.203 ..P WKT 2011 02 16 15 14 55 31.3200 -97.3300 251.000 30.0 123.795 4.490 -999.990 -999.990 1.238 ..P WKT 2011 02 16 15 19 55 31.3200 -97.3300 251.000 122.0 126.660 3.540 -999.990 -999.990 1.267 ..P WKT 2011 02 16 15 24 55 31.3200 -97.3300 251.000 457.0 123.541 4.070 -999.990 -999.990 1.235 ..P WKT 2011 02 16 15 29 55 31.3200 -97.3300 251.000 30.0 122.084 3.610 -999.990 -999.990 1.221 ..P WKT 2011 02 16 15 34 55 31.3200 -97.3300 251.000 122.0 127.775 3.790 -999.990 -999.990 1.278 ..P WKT 2011 02 16 15 39 55 31.3200 -97.3300 251.000 457.0 122.494 3.730 -999.990 -999.990 1.225 ..P WKT 2011 02 16 15 49 55 31.3200 -97.3300 251.000 30.0 112.930 3.720 -999.990 -999.990 1.129 ..P WKT 2011 02 16 15 54 55 31.3200 -97.3300 251.000 122.0 120.616 3.860 -999.990 -999.990 1.206 ..P WKT 2011 02 16 15 59 55 31.3200 -97.3300 251.000 457.0 126.973 3.920 -999.990 -999.990 1.270 ..P WKT 2011 02 16 16 04 55 31.3200 -97.3300 251.000 30.0 124.685 4.550 -999.990 -999.990 1.247 ..P WKT 2011 02 16 16 09 55 31.3200 -97.3300 251.000 122.0 118.239 4.200 -999.990 -999.990 1.182 ..P WKT 2011 02 16 16 14 55 31.3200 -97.3300 251.000 457.0 122.102 4.150 -999.990 -999.990 1.221 ..P WKT 2011 02 16 16 24 55 31.3200 -97.3300 251.000 30.0 118.902 4.310 -999.990 -999.990 1.189 ..P WKT 2011 02 16 16 29 55 31.3200 -97.3300 251.000 122.0 125.142 3.850 -999.990 -999.990 1.251 ..P WKT 2011 02 16 16 34 55 31.3200 -97.3300 251.000 457.0 122.734 4.030 -999.990 -999.990 1.227 ..P WKT 2011 02 16 16 39 55 31.3200 -97.3300 251.000 30.0 120.991 4.180 -999.990 -999.990 1.210 ..P WKT 2011 02 16 16 44 55 31.3200 -97.3300 251.000 122.0 126.567 3.490 -999.990 -999.990 1.266 ..P WKT 2011 02 16 16 49 55 31.3200 -97.3300 251.000 457.0 121.830 3.470 -999.990 -999.990 1.218 ..P WKT 2011 02 16 17 04 55 31.3200 -97.3300 251.000 30.0 126.521 3.430 -999.990 -999.990 1.265 ..P WKT 2011 02 16 17 09 55 31.3200 -97.3300 251.000 122.0 126.579 3.720 -999.990 -999.990 1.266 ..P WKT 2011 02 16 17 14 55 31.3200 -97.3300 251.000 457.0 129.630 4.260 -999.990 -999.990 1.296 ..P WKT 2011 02 16 17 19 55 31.3200 -97.3300 251.000 30.0 127.026 4.610 -999.990 -999.990 1.270 ..P WKT 2011 02 16 17 24 55 31.3200 -97.3300 251.000 122.0 132.074 5.020 -999.990 -999.990 1.321 ..P WKT 2011 02 16 17 29 55 31.3200 -97.3300 251.000 457.0 120.816 3.160 -999.990 -999.990 1.208 ..P WKT 2011 02 16 17 39 55 31.3200 -97.3300 251.000 30.0 120.460 4.940 -999.990 -999.990 1.205 ..P WKT 2011 02 16 17 44 55 31.3200 -97.3300 251.000 122.0 131.032 3.900 -999.990 -999.990 1.310 ..P WKT 2011 02 16 17 49 55 31.3200 -97.3300 251.000 457.0 129.288 4.020 -999.990 -999.990 1.293 ..P WKT 2011 02 16 17 54 55 31.3200 -97.3300 251.000 30.0 128.210 3.700 -999.990 -999.990 1.282 ..P WKT 2011 02 16 17 59 55 31.3200 -97.3300 251.000 122.0 121.139 3.610 -999.990 -999.990 1.211 ..P WKT 2011 02 16 18 04 55 31.3200 -97.3300 251.000 457.0 131.380 3.400 -999.990 -999.990 1.314 ..P WKT 2011 02 16 18 14 55 31.3200 -97.3300 251.000 30.0 128.914 3.820 -999.990 -999.990 1.289 ..P WKT 2011 02 16 18 19 55 31.3200 -97.3300 251.000 122.0 130.191 4.140 -999.990 -999.990 1.302 ..P WKT 2011 02 16 18 24 55 31.3200 -97.3300 251.000 457.0 120.312 4.220 -999.990 -999.990 1.203 ..P WKT 2011 02 16 18 29 55 31.3200 -97.3300 251.000 30.0 124.251 3.810 -999.990 -999.990 1.243 ..P WKT 2011 02 16 18 34 55 31.3200 -97.3300 251.000 122.0 130.856 4.360 -999.990 -999.990 1.309 ..P WKT 2011 02 16 18 39 55 31.3200 -97.3300 251.000 457.0 126.304 4.460 -999.990 -999.990 1.263 ..P WKT 2011 02 16 18 49 55 31.3200 -97.3300 251.000 30.0 124.337 4.080 -999.990 -999.990 1.243 ..P WKT 2011 02 16 18 54 55 31.3200 -97.3300 251.000 122.0 128.087 4.030 -999.990 -999.990 1.281 ..P WKT 2011 02 16 18 59 55 31.3200 -97.3300 251.000 457.0 134.504 3.840 -999.990 -999.990 1.345 ..P WKT 2011 02 16 19 04 55 31.3200 -97.3300 251.000 30.0 131.593 4.220 -999.990 -999.990 1.316 ..P WKT 2011 02 16 19 09 55 31.3200 -97.3300 251.000 122.0 130.514 4.130 -999.990 -999.990 1.305 ..P WKT 2011 02 16 19 14 55 31.3200 -97.3300 251.000 457.0 128.102 3.790 -999.990 -999.990 1.281 ..P WKT 2011 02 16 19 24 55 31.3200 -97.3300 251.000 30.0 119.447 3.620 -999.990 -999.990 1.194 ..P WKT 2011 02 16 19 29 55 31.3200 -97.3300 251.000 122.0 115.535 4.650 -999.990 -999.990 1.155 ..P WKT 2011 02 16 19 34 55 31.3200 -97.3300 251.000 457.0 125.951 4.590 -999.990 -999.990 1.260 ..P WKT 2011 02 16 19 39 55 31.3200 -97.3300 251.000 30.0 122.372 4.070 -999.990 -999.990 1.224 ..P WKT 2011 02 16 19 44 55 31.3200 -97.3300 251.000 122.0 128.291 4.060 -999.990 -999.990 1.283 ..P WKT 2011 02 16 19 49 55 31.3200 -97.3300 251.000 457.0 122.212 4.170 -999.990 -999.990 1.222 ..P WKT 2011 02 16 19 59 55 31.3200 -97.3300 251.000 30.0 126.528 3.350 -999.990 -999.990 1.265 ..P WKT 2011 02 16 20 04 55 31.3200 -97.3300 251.000 122.0 131.258 5.610 -999.990 -999.990 1.313 ..P WKT 2011 02 16 20 09 55 31.3200 -97.3300 251.000 457.0 128.154 3.730 -999.990 -999.990 1.282 ..P WKT 2011 02 16 20 14 55 31.3200 -97.3300 251.000 30.0 127.051 3.730 -999.990 -999.990 1.271 ..P WKT 2011 02 16 20 19 55 31.3200 -97.3300 251.000 122.0 130.614 3.760 -999.990 -999.990 1.306 ..P WKT 2011 02 16 20 24 55 31.3200 -97.3300 251.000 457.0 128.510 3.750 -999.990 -999.990 1.285 ..P WKT 2011 02 16 20 34 55 31.3200 -97.3300 251.000 30.0 125.279 3.580 -999.990 -999.990 1.253 ..P WKT 2011 02 16 20 39 55 31.3200 -97.3300 251.000 122.0 120.150 4.040 -999.990 -999.990 1.202 ..P WKT 2011 02 16 20 44 55 31.3200 -97.3300 251.000 457.0 134.361 3.700 -999.990 -999.990 1.344 ..P WKT 2011 02 16 20 49 55 31.3200 -97.3300 251.000 30.0 127.564 4.030 -999.990 -999.990 1.276 ..P WKT 2011 02 16 20 54 55 31.3200 -97.3300 251.000 122.0 132.439 3.470 -999.990 -999.990 1.324 ..P WKT 2011 02 16 20 59 55 31.3200 -97.3300 251.000 457.0 127.643 3.530 -999.990 -999.990 1.276 ..P WKT 2011 02 16 21 09 55 31.3200 -97.3300 251.000 30.0 130.628 3.560 -999.990 -999.990 1.306 ..P WKT 2011 02 16 21 14 55 31.3200 -97.3300 251.000 122.0 131.073 3.550 -999.990 -999.990 1.311 ..P WKT 2011 02 16 21 19 55 31.3200 -97.3300 251.000 457.0 128.515 3.340 -999.990 -999.990 1.285 ..P WKT 2011 02 16 21 24 55 31.3200 -97.3300 251.000 30.0 119.954 3.710 -999.990 -999.990 1.200 ..P WKT 2011 02 16 21 29 55 31.3200 -97.3300 251.000 122.0 128.070 4.160 -999.990 -999.990 1.281 ..P WKT 2011 02 16 21 34 55 31.3200 -97.3300 251.000 457.0 126.179 3.820 -999.990 -999.990 1.262 ..P WKT 2011 02 16 21 44 55 31.3200 -97.3300 251.000 30.0 125.376 3.230 -999.990 -999.990 1.254 ..P WKT 2011 02 16 21 49 55 31.3200 -97.3300 251.000 122.0 123.795 3.380 -999.990 -999.990 1.238 ..P WKT 2011 02 16 21 54 55 31.3200 -97.3300 251.000 457.0 126.218 3.650 -999.990 -999.990 1.262 ..P WKT 2011 02 16 21 59 55 31.3200 -97.3300 251.000 30.0 126.305 4.140 -999.990 -999.990 1.263 ..P WKT 2011 02 16 22 04 55 31.3200 -97.3300 251.000 122.0 131.397 3.760 -999.990 -999.990 1.314 ..P WKT 2011 02 16 22 09 55 31.3200 -97.3300 251.000 457.0 132.319 4.290 -999.990 -999.990 1.323 ..P WKT 2011 02 16 22 19 55 31.3200 -97.3300 251.000 30.0 120.789 3.360 -999.990 -999.990 1.208 ..P WKT 2011 02 16 22 24 55 31.3200 -97.3300 251.000 122.0 132.199 4.190 -999.990 -999.990 1.322 ..P WKT 2011 02 16 22 29 55 31.3200 -97.3300 251.000 457.0 129.259 4.320 -999.990 -999.990 1.293 ..P WKT 2011 02 16 22 34 55 31.3200 -97.3300 251.000 30.0 122.980 3.540 -999.990 -999.990 1.230 ..P WKT 2011 02 16 22 39 55 31.3200 -97.3300 251.000 122.0 129.052 3.980 -999.990 -999.990 1.291 ..P WKT 2011 02 16 22 44 55 31.3200 -97.3300 251.000 457.0 127.614 3.400 -999.990 -999.990 1.276 ..P WKT 2011 02 16 22 54 55 31.3200 -97.3300 251.000 30.0 115.912 3.260 -999.990 -999.990 1.159 ..P WKT 2011 02 16 22 59 55 31.3200 -97.3300 251.000 122.0 118.503 3.720 -999.990 -999.990 1.185 ..P WKT 2011 02 16 23 04 55 31.3200 -97.3300 251.000 457.0 121.427 4.090 -999.990 -999.990 1.214 ..P WKT 2011 02 16 23 09 55 31.3200 -97.3300 251.000 30.0 124.186 3.620 -999.990 -999.990 1.242 ..P WKT 2011 02 16 23 14 55 31.3200 -97.3300 251.000 122.0 121.100 3.840 -999.990 -999.990 1.211 ..P WKT 2011 02 16 23 19 55 31.3200 -97.3300 251.000 457.0 125.529 3.520 -999.990 -999.990 1.255 ..P WKT 2011 02 16 23 29 55 31.3200 -97.3300 251.000 30.0 121.603 3.140 -999.990 -999.990 1.216 ..P WKT 2011 02 16 23 34 55 31.3200 -97.3300 251.000 122.0 123.099 3.370 -999.990 -999.990 1.231 ..P WKT 2011 02 16 23 39 55 31.3200 -97.3300 251.000 457.0 121.257 3.260 -999.990 -999.990 1.213 ..P WKT 2011 02 16 23 44 55 31.3200 -97.3300 251.000 30.0 125.260 3.160 -999.990 -999.990 1.253 ..P WKT 2011 02 16 23 49 55 31.3200 -97.3300 251.000 122.0 138.614 2.740 -999.990 -999.990 1.386 ..P WKT 2011 02 17 00 09 55 31.3200 -97.3300 251.000 457.0 138.996 2.600 -999.990 -999.990 1.390 ..P WKT 2011 02 17 00 10 25 31.3200 -97.3300 251.000 457.0 139.358 2.510 -999.990 -999.990 1.394 ..P WKT 2011 02 17 00 10 55 31.3200 -97.3300 251.000 457.0 133.372 3.490 -999.990 -999.990 1.334 ..P WKT 2011 02 17 00 11 25 31.3200 -97.3300 251.000 457.0 131.731 2.480 -999.990 -999.990 1.317 ..P WKT 2011 02 17 00 11 55 31.3200 -97.3300 251.000 457.0 131.759 2.610 -999.990 -999.990 1.318 ..P WKT 2011 02 17 00 12 25 31.3200 -97.3300 251.000 457.0 136.465 2.510 -999.990 -999.990 1.365 ..P WKT 2011 02 17 00 12 55 31.3200 -97.3300 251.000 457.0 133.821 2.750 -999.990 -999.990 1.338 ..P WKT 2011 02 17 00 13 25 31.3200 -97.3300 251.000 457.0 133.181 2.830 -999.990 -999.990 1.332 ..P WKT 2011 02 17 00 13 55 31.3200 -97.3300 251.000 457.0 134.212 3.470 -999.990 -999.990 1.342 ..P WKT 2011 02 17 00 14 25 31.3200 -97.3300 251.000 457.0 133.906 2.760 -999.990 -999.990 1.339 ..P WKT 2011 02 17 00 14 55 31.3200 -97.3300 251.000 457.0 131.261 3.270 -999.990 -999.990 1.313 ..P WKT 2011 02 17 00 19 55 31.3200 -97.3300 251.000 30.0 136.559 2.630 -999.990 -999.990 1.366 ..P WKT 2011 02 17 00 24 55 31.3200 -97.3300 251.000 122.0 139.852 3.340 -999.990 -999.990 1.399 ..P WKT 2011 02 17 00 29 55 31.3200 -97.3300 251.000 457.0 137.798 2.590 -999.990 -999.990 1.378 ..P WKT 2011 02 17 00 34 55 31.3200 -97.3300 251.000 30.0 139.420 3.370 -999.990 -999.990 1.394 ..P WKT 2011 02 17 00 39 55 31.3200 -97.3300 251.000 122.0 140.375 3.330 -999.990 -999.990 1.404 ..P WKT 2011 02 17 00 44 55 31.3200 -97.3300 251.000 457.0 140.661 3.140 -999.990 -999.990 1.407 ..P WKT 2011 02 17 00 54 55 31.3200 -97.3300 251.000 30.0 137.447 3.480 -999.990 -999.990 1.374 ..P WKT 2011 02 17 00 59 55 31.3200 -97.3300 251.000 122.0 136.956 3.070 -999.990 -999.990 1.370 ..P WKT 2011 02 17 01 04 55 31.3200 -97.3300 251.000 457.0 132.118 3.130 -999.990 -999.990 1.321 ..P WKT 2011 02 17 01 09 55 31.3200 -97.3300 251.000 30.0 136.981 3.300 -999.990 -999.990 1.370 ..P WKT 2011 02 17 01 14 55 31.3200 -97.3300 251.000 122.0 138.164 3.500 -999.990 -999.990 1.382 ..P WKT 2011 02 17 01 19 55 31.3200 -97.3300 251.000 457.0 127.300 4.900 -999.990 -999.990 1.273 ..P WKT 2011 02 17 01 29 55 31.3200 -97.3300 251.000 30.0 137.172 3.680 -999.990 -999.990 1.372 ..P WKT 2011 02 17 01 34 55 31.3200 -97.3300 251.000 122.0 134.482 3.320 -999.990 -999.990 1.345 ..P WKT 2011 02 17 01 39 55 31.3200 -97.3300 251.000 457.0 127.104 4.030 -999.990 -999.990 1.271 ..P WKT 2011 02 17 01 44 55 31.3200 -97.3300 251.000 30.0 139.814 3.320 -999.990 -999.990 1.398 ..P WKT 2011 02 17 01 49 55 31.3200 -97.3300 251.000 122.0 132.436 3.230 -999.990 -999.990 1.324 ..P WKT 2011 02 17 01 54 55 31.3200 -97.3300 251.000 457.0 138.452 3.980 -999.990 -999.990 1.385 ..P WKT 2011 02 17 02 04 55 31.3200 -97.3300 251.000 30.0 127.972 3.340 -999.990 -999.990 1.280 ..P WKT 2011 02 17 02 09 55 31.3200 -97.3300 251.000 122.0 134.923 3.160 -999.990 -999.990 1.349 ..P WKT 2011 02 17 02 14 55 31.3200 -97.3300 251.000 457.0 138.692 3.250 -999.990 -999.990 1.387 ..P WKT 2011 02 17 02 19 55 31.3200 -97.3300 251.000 30.0 135.425 4.020 -999.990 -999.990 1.354 ..P WKT 2011 02 17 02 24 55 31.3200 -97.3300 251.000 122.0 136.514 4.760 -999.990 -999.990 1.365 ..P WKT 2011 02 17 02 29 55 31.3200 -97.3300 251.000 457.0 138.441 4.620 -999.990 -999.990 1.384 ..P WKT 2011 02 17 02 39 55 31.3200 -97.3300 251.000 30.0 131.569 4.130 -999.990 -999.990 1.316 ..P WKT 2011 02 17 02 44 55 31.3200 -97.3300 251.000 122.0 140.202 3.670 -999.990 -999.990 1.402 ..P WKT 2011 02 17 02 49 55 31.3200 -97.3300 251.000 457.0 131.233 3.940 -999.990 -999.990 1.312 ..P WKT 2011 02 17 02 54 55 31.3200 -97.3300 251.000 30.0 137.185 3.860 -999.990 -999.990 1.372 ..P WKT 2011 02 17 02 59 55 31.3200 -97.3300 251.000 122.0 140.622 4.040 -999.990 -999.990 1.406 ..P WKT 2011 02 17 03 04 55 31.3200 -97.3300 251.000 457.0 136.010 4.210 -999.990 -999.990 1.360 ..P WKT 2011 02 17 03 14 55 31.3200 -97.3300 251.000 30.0 131.937 4.210 -999.990 -999.990 1.319 ..P WKT 2011 02 17 03 19 55 31.3200 -97.3300 251.000 122.0 138.179 4.170 -999.990 -999.990 1.382 ..P WKT 2011 02 17 03 24 55 31.3200 -97.3300 251.000 457.0 115.901 4.370 -999.990 -999.990 1.159 ..P WKT 2011 02 17 03 29 55 31.3200 -97.3300 251.000 30.0 129.526 4.730 -999.990 -999.990 1.295 ..P WKT 2011 02 17 03 34 55 31.3200 -97.3300 251.000 122.0 132.582 4.890 -999.990 -999.990 1.326 ..P WKT 2011 02 17 03 39 55 31.3200 -97.3300 251.000 457.0 114.659 4.950 -999.990 -999.990 1.147 ..P WKT 2011 02 17 03 49 55 31.3200 -97.3300 251.000 30.0 133.216 5.180 -999.990 -999.990 1.332 ..P WKT 2011 02 17 03 54 55 31.3200 -97.3300 251.000 122.0 135.626 5.030 -999.990 -999.990 1.356 ..P WKT 2011 02 17 03 59 55 31.3200 -97.3300 251.000 457.0 123.429 5.060 -999.990 -999.990 1.234 ..P WKT 2011 02 17 04 04 55 31.3200 -97.3300 251.000 30.0 128.525 4.660 -999.990 -999.990 1.285 ..P WKT 2011 02 17 04 09 55 31.3200 -97.3300 251.000 122.0 128.248 4.560 -999.990 -999.990 1.282 ..P WKT 2011 02 17 04 14 55 31.3200 -97.3300 251.000 457.0 124.612 4.650 -999.990 -999.990 1.246 ..P WKT 2011 02 17 04 24 55 31.3200 -97.3300 251.000 30.0 125.234 5.360 -999.990 -999.990 1.252 ..P WKT 2011 02 17 04 29 55 31.3200 -97.3300 251.000 122.0 128.821 4.430 -999.990 -999.990 1.288 ..P WKT 2011 02 17 04 34 55 31.3200 -97.3300 251.000 457.0 120.983 6.450 -999.990 -999.990 1.210 ..P WKT 2011 02 17 04 39 55 31.3200 -97.3300 251.000 30.0 131.628 4.310 -999.990 -999.990 1.316 ..P WKT 2011 02 17 04 44 55 31.3200 -97.3300 251.000 122.0 129.838 4.190 -999.990 -999.990 1.298 ..P WKT 2011 02 17 04 49 55 31.3200 -97.3300 251.000 457.0 118.637 4.730 -999.990 -999.990 1.186 ..P WKT 2011 02 17 05 04 55 31.3200 -97.3300 251.000 30.0 123.459 4.300 -999.990 -999.990 1.235 ..P WKT 2011 02 17 05 09 55 31.3200 -97.3300 251.000 122.0 124.748 4.750 -999.990 -999.990 1.247 ..P WKT 2011 02 17 05 14 55 31.3200 -97.3300 251.000 457.0 124.021 4.810 -999.990 -999.990 1.240 ..P WKT 2011 02 17 05 19 55 31.3200 -97.3300 251.000 30.0 124.638 4.830 -999.990 -999.990 1.246 ..P WKT 2011 02 17 05 24 55 31.3200 -97.3300 251.000 122.0 124.919 5.230 -999.990 -999.990 1.249 ..P WKT 2011 02 17 05 29 55 31.3200 -97.3300 251.000 457.0 130.247 5.220 -999.990 -999.990 1.302 ..P WKT 2011 02 17 05 39 55 31.3200 -97.3300 251.000 30.0 129.194 5.690 -999.990 -999.990 1.292 ..P WKT 2011 02 17 05 44 55 31.3200 -97.3300 251.000 122.0 132.234 5.850 -999.990 -999.990 1.322 ..P WKT 2011 02 17 05 49 55 31.3200 -97.3300 251.000 457.0 129.553 6.400 -999.990 -999.990 1.296 ..P WKT 2011 02 17 05 54 55 31.3200 -97.3300 251.000 30.0 125.188 6.150 -999.990 -999.990 1.252 ..P WKT 2011 02 17 05 59 55 31.3200 -97.3300 251.000 122.0 128.228 6.840 -999.990 -999.990 1.282 ..P WKT 2011 02 17 06 04 55 31.3200 -97.3300 251.000 457.0 126.893 7.180 -999.990 -999.990 1.269 ..P WKT 2011 02 17 06 14 55 31.3200 -97.3300 251.000 30.0 121.359 6.500 -999.990 -999.990 1.214 ..P WKT 2011 02 17 06 19 55 31.3200 -97.3300 251.000 122.0 129.621 6.330 -999.990 -999.990 1.296 ..P WKT 2011 02 17 06 24 55 31.3200 -97.3300 251.000 457.0 121.717 6.010 -999.990 -999.990 1.217 ..P WKT 2011 02 17 06 29 55 31.3200 -97.3300 251.000 30.0 126.612 5.590 -999.990 -999.990 1.266 ..P WKT 2011 02 17 06 34 55 31.3200 -97.3300 251.000 122.0 132.013 5.720 -999.990 -999.990 1.320 ..P WKT 2011 02 17 06 39 55 31.3200 -97.3300 251.000 457.0 129.161 5.230 -999.990 -999.990 1.292 ..P WKT 2011 02 17 06 49 55 31.3200 -97.3300 251.000 30.0 129.136 6.310 -999.990 -999.990 1.291 ..P WKT 2011 02 17 06 54 55 31.3200 -97.3300 251.000 122.0 137.188 5.130 -999.990 -999.990 1.372 ..P WKT 2011 02 17 06 59 55 31.3200 -97.3300 251.000 457.0 128.893 5.580 -999.990 -999.990 1.289 ..P WKT 2011 02 17 07 04 55 31.3200 -97.3300 251.000 30.0 125.822 5.720 -999.990 -999.990 1.258 ..P WKT 2011 02 17 07 09 55 31.3200 -97.3300 251.000 122.0 126.965 4.840 -999.990 -999.990 1.270 ..P WKT 2011 02 17 07 14 55 31.3200 -97.3300 251.000 457.0 120.690 4.770 -999.990 -999.990 1.207 ..P WKT 2011 02 17 07 24 55 31.3200 -97.3300 251.000 30.0 121.650 5.040 -999.990 -999.990 1.217 ..P WKT 2011 02 17 07 29 55 31.3200 -97.3300 251.000 122.0 125.347 6.220 -999.990 -999.990 1.253 ..P WKT 2011 02 17 07 34 55 31.3200 -97.3300 251.000 457.0 121.117 4.970 -999.990 -999.990 1.211 ..P WKT 2011 02 17 07 39 55 31.3200 -97.3300 251.000 30.0 118.911 5.430 -999.990 -999.990 1.189 ..P WKT 2011 02 17 07 44 55 31.3200 -97.3300 251.000 122.0 128.681 6.120 -999.990 -999.990 1.287 ..P WKT 2011 02 17 07 49 55 31.3200 -97.3300 251.000 457.0 122.257 5.690 -999.990 -999.990 1.223 ..P WKT 2011 02 17 07 59 55 31.3200 -97.3300 251.000 30.0 120.278 5.280 -999.990 -999.990 1.203 ..P WKT 2011 02 17 08 04 55 31.3200 -97.3300 251.000 122.0 130.969 5.080 -999.990 -999.990 1.310 ..P WKT 2011 02 17 08 09 55 31.3200 -97.3300 251.000 457.0 125.459 5.040 -999.990 -999.990 1.255 ..P WKT 2011 02 17 08 14 55 31.3200 -97.3300 251.000 30.0 122.649 5.030 -999.990 -999.990 1.226 ..P WKT 2011 02 17 08 19 55 31.3200 -97.3300 251.000 122.0 127.940 5.960 -999.990 -999.990 1.279 ..P WKT 2011 02 17 08 24 55 31.3200 -97.3300 251.000 457.0 128.845 5.220 -999.990 -999.990 1.288 ..P WKT 2011 02 17 08 34 55 31.3200 -97.3300 251.000 30.0 123.655 5.060 -999.990 -999.990 1.237 ..P WKT 2011 02 17 08 39 55 31.3200 -97.3300 251.000 122.0 123.304 5.250 -999.990 -999.990 1.233 ..P WKT 2011 02 17 08 44 55 31.3200 -97.3300 251.000 457.0 122.278 5.080 -999.990 -999.990 1.223 ..P WKT 2011 02 17 08 49 55 31.3200 -97.3300 251.000 30.0 131.049 6.010 -999.990 -999.990 1.310 ..P WKT 2011 02 17 08 54 55 31.3200 -97.3300 251.000 122.0 128.671 5.950 -999.990 -999.990 1.287 ..P WKT 2011 02 17 08 59 55 31.3200 -97.3300 251.000 457.0 123.926 4.940 -999.990 -999.990 1.239 ..P WKT 2011 02 17 09 09 55 31.3200 -97.3300 251.000 30.0 118.782 6.480 -999.990 -999.990 1.188 ..P WKT 2011 02 17 09 14 55 31.3200 -97.3300 251.000 122.0 128.522 5.070 -999.990 -999.990 1.285 ..P WKT 2011 02 17 09 19 55 31.3200 -97.3300 251.000 457.0 117.644 5.610 -999.990 -999.990 1.176 ..P WKT 2011 02 17 09 24 55 31.3200 -97.3300 251.000 30.0 122.314 5.810 -999.990 -999.990 1.223 ..P WKT 2011 02 17 09 29 55 31.3200 -97.3300 251.000 122.0 125.972 5.780 -999.990 -999.990 1.260 ..P WKT 2011 02 17 09 34 55 31.3200 -97.3300 251.000 457.0 120.838 5.350 -999.990 -999.990 1.208 ..P WKT 2011 02 17 09 44 55 31.3200 -97.3300 251.000 30.0 127.841 5.920 -999.990 -999.990 1.278 ..P WKT 2011 02 17 09 49 55 31.3200 -97.3300 251.000 122.0 122.731 5.520 -999.990 -999.990 1.227 ..P WKT 2011 02 17 09 54 55 31.3200 -97.3300 251.000 457.0 126.415 6.100 -999.990 -999.990 1.264 ..P WKT 2011 02 17 09 59 55 31.3200 -97.3300 251.000 30.0 127.562 6.570 -999.990 -999.990 1.276 ..P WKT 2011 02 17 10 04 55 31.3200 -97.3300 251.000 122.0 129.216 5.920 -999.990 -999.990 1.292 ..P WKT 2011 02 17 10 09 55 31.3200 -97.3300 251.000 457.0 125.288 5.830 -999.990 -999.990 1.253 ..P WKT 2011 02 17 10 19 55 31.3200 -97.3300 251.000 30.0 126.615 6.630 -999.990 -999.990 1.266 ..P WKT 2011 02 17 10 24 55 31.3200 -97.3300 251.000 122.0 127.134 5.900 -999.990 -999.990 1.271 ..P WKT 2011 02 17 10 29 55 31.3200 -97.3300 251.000 457.0 120.713 6.130 -999.990 -999.990 1.207 ..P WKT 2011 02 17 10 34 55 31.3200 -97.3300 251.000 30.0 131.050 6.800 -999.990 -999.990 1.311 ..P WKT 2011 02 17 10 39 55 31.3200 -97.3300 251.000 122.0 127.167 6.450 -999.990 -999.990 1.272 ..P WKT 2011 02 17 10 44 55 31.3200 -97.3300 251.000 457.0 122.269 5.930 -999.990 -999.990 1.223 ..P WKT 2011 02 17 10 54 55 31.3200 -97.3300 251.000 30.0 128.799 6.380 -999.990 -999.990 1.288 ..P WKT 2011 02 17 10 59 55 31.3200 -97.3300 251.000 122.0 129.221 6.370 -999.990 -999.990 1.292 ..P WKT 2011 02 17 11 04 55 31.3200 -97.3300 251.000 457.0 121.851 6.770 -999.990 -999.990 1.219 ..P WKT 2011 02 17 11 09 55 31.3200 -97.3300 251.000 30.0 126.678 6.610 -999.990 -999.990 1.267 ..P WKT 2011 02 17 11 14 55 31.3200 -97.3300 251.000 122.0 123.882 6.300 -999.990 -999.990 1.239 ..P WKT 2011 02 17 11 19 55 31.3200 -97.3300 251.000 457.0 129.726 6.780 -999.990 -999.990 1.297 ..P WKT 2011 02 17 11 29 55 31.3200 -97.3300 251.000 30.0 126.344 6.210 -999.990 -999.990 1.263 ..P WKT 2011 02 17 11 34 55 31.3200 -97.3300 251.000 122.0 126.946 7.630 -999.990 -999.990 1.269 ..P WKT 2011 02 17 11 39 55 31.3200 -97.3300 251.000 457.0 127.208 6.200 -999.990 -999.990 1.272 ..P WKT 2011 02 17 11 44 55 31.3200 -97.3300 251.000 30.0 131.709 6.530 -999.990 -999.990 1.317 ..P WKT 2011 02 17 11 49 55 31.3200 -97.3300 251.000 122.0 132.312 6.490 -999.990 -999.990 1.323 ..P WKT 2011 02 17 12 09 55 31.3200 -97.3300 251.000 457.0 128.289 6.350 -999.990 -999.990 1.283 ..P WKT 2011 02 17 12 10 25 31.3200 -97.3300 251.000 457.0 125.245 6.560 -999.990 -999.990 1.252 ..P WKT 2011 02 17 12 10 55 31.3200 -97.3300 251.000 457.0 120.504 6.210 -999.990 -999.990 1.205 ..P WKT 2011 02 17 12 11 25 31.3200 -97.3300 251.000 457.0 123.225 6.070 -999.990 -999.990 1.232 ..P WKT 2011 02 17 12 11 55 31.3200 -97.3300 251.000 457.0 121.875 6.070 -999.990 -999.990 1.219 ..P WKT 2011 02 17 12 12 25 31.3200 -97.3300 251.000 457.0 122.900 6.080 -999.990 -999.990 1.229 ..P WKT 2011 02 17 12 12 55 31.3200 -97.3300 251.000 457.0 122.569 6.070 -999.990 -999.990 1.226 ..P WKT 2011 02 17 12 13 25 31.3200 -97.3300 251.000 457.0 121.220 6.580 -999.990 -999.990 1.212 ..P WKT 2011 02 17 12 13 55 31.3200 -97.3300 251.000 457.0 123.601 6.720 -999.990 -999.990 1.236 ..P WKT 2011 02 17 12 14 25 31.3200 -97.3300 251.000 457.0 128.017 6.440 -999.990 -999.990 1.280 ..P WKT 2011 02 17 12 14 55 31.3200 -97.3300 251.000 457.0 127.347 6.340 -999.990 -999.990 1.273 ..P WKT 2011 02 17 12 19 55 31.3200 -97.3300 251.000 30.0 128.778 6.990 -999.990 -999.990 1.288 ..P WKT 2011 02 17 12 24 55 31.3200 -97.3300 251.000 122.0 127.496 6.220 -999.990 -999.990 1.275 ..P WKT 2011 02 17 12 29 55 31.3200 -97.3300 251.000 457.0 122.144 6.270 -999.990 -999.990 1.221 ..P WKT 2011 02 17 12 34 55 31.3200 -97.3300 251.000 30.0 129.681 7.540 -999.990 -999.990 1.297 ..P WKT 2011 02 17 12 39 55 31.3200 -97.3300 251.000 122.0 130.433 6.930 -999.990 -999.990 1.304 ..P WKT 2011 02 17 12 44 55 31.3200 -97.3300 251.000 457.0 127.455 6.530 -999.990 -999.990 1.275 ..P WKT 2011 02 17 12 54 55 31.3200 -97.3300 251.000 30.0 125.059 6.820 -999.990 -999.990 1.251 ..P WKT 2011 02 17 12 59 55 31.3200 -97.3300 251.000 122.0 130.726 6.790 -999.990 -999.990 1.307 ..P WKT 2011 02 17 13 04 55 31.3200 -97.3300 251.000 457.0 124.186 6.590 -999.990 -999.990 1.242 ..P WKT 2011 02 17 13 09 55 31.3200 -97.3300 251.000 30.0 128.835 7.310 -999.990 -999.990 1.288 ..P WKT 2011 02 17 13 14 55 31.3200 -97.3300 251.000 122.0 131.112 7.630 -999.990 -999.990 1.311 ..P WKT 2011 02 17 13 19 55 31.3200 -97.3300 251.000 457.0 126.267 6.640 -999.990 -999.990 1.263 ..P WKT 2011 02 17 13 29 55 31.3200 -97.3300 251.000 30.0 135.397 6.840 -999.990 -999.990 1.354 ..P WKT 2011 02 17 13 34 55 31.3200 -97.3300 251.000 122.0 132.417 7.100 -999.990 -999.990 1.324 ..P WKT 2011 02 17 13 39 55 31.3200 -97.3300 251.000 457.0 124.690 6.810 -999.990 -999.990 1.247 ..P WKT 2011 02 17 13 44 55 31.3200 -97.3300 251.000 30.0 124.762 6.550 -999.990 -999.990 1.248 ..P WKT 2011 02 17 13 49 55 31.3200 -97.3300 251.000 122.0 132.294 6.640 -999.990 -999.990 1.323 ..P WKT 2011 02 17 13 54 55 31.3200 -97.3300 251.000 457.0 127.449 6.480 -999.990 -999.990 1.274 ..P WKT 2011 02 17 14 04 55 31.3200 -97.3300 251.000 30.0 132.921 6.460 -999.990 -999.990 1.329 ..P WKT 2011 02 17 14 09 55 31.3200 -97.3300 251.000 122.0 132.218 6.400 -999.990 -999.990 1.322 ..P WKT 2011 02 17 14 14 55 31.3200 -97.3300 251.000 457.0 126.768 7.110 -999.990 -999.990 1.268 ..P WKT 2011 02 17 14 19 55 31.3200 -97.3300 251.000 30.0 135.050 6.200 -999.990 -999.990 1.351 ..P WKT 2011 02 17 14 24 55 31.3200 -97.3300 251.000 122.0 134.346 6.520 -999.990 -999.990 1.343 ..P WKT 2011 02 17 14 29 55 31.3200 -97.3300 251.000 457.0 130.423 6.650 -999.990 -999.990 1.304 ..P WKT 2011 02 17 14 39 55 31.3200 -97.3300 251.000 30.0 137.226 6.040 -999.990 -999.990 1.372 ..P WKT 2011 02 17 14 44 55 31.3200 -97.3300 251.000 122.0 138.630 6.410 -999.990 -999.990 1.386 ..P WKT 2011 02 17 14 49 55 31.3200 -97.3300 251.000 457.0 131.728 6.010 -999.990 -999.990 1.317 ..P WKT 2011 02 17 14 54 55 31.3200 -97.3300 251.000 30.0 133.979 6.510 -999.990 -999.990 1.340 ..P WKT 2011 02 17 14 59 55 31.3200 -97.3300 251.000 122.0 134.536 6.290 -999.990 -999.990 1.345 ..P WKT 2011 02 17 15 04 55 31.3200 -97.3300 251.000 457.0 125.938 6.120 -999.990 -999.990 1.259 ..P WKT 2011 02 17 15 14 55 31.3200 -97.3300 251.000 30.0 136.809 6.330 -999.990 -999.990 1.368 ..P WKT 2011 02 17 15 19 55 31.3200 -97.3300 251.000 122.0 139.327 7.270 -999.990 -999.990 1.393 ..P WKT 2011 02 17 15 24 55 31.3200 -97.3300 251.000 457.0 128.454 6.700 -999.990 -999.990 1.285 ..P WKT 2011 02 17 15 29 55 31.3200 -97.3300 251.000 30.0 129.785 6.650 -999.990 -999.990 1.298 ..P WKT 2011 02 17 15 34 55 31.3200 -97.3300 251.000 122.0 138.065 6.340 -999.990 -999.990 1.381 ..P WKT 2011 02 17 15 39 55 31.3200 -97.3300 251.000 457.0 134.990 6.160 -999.990 -999.990 1.350 ..P WKT 2011 02 17 15 49 55 31.3200 -97.3300 251.000 30.0 132.591 6.730 -999.990 -999.990 1.326 ..P WKT 2011 02 17 15 54 55 31.3200 -97.3300 251.000 122.0 130.896 6.360 -999.990 -999.990 1.309 ..P WKT 2011 02 17 15 59 55 31.3200 -97.3300 251.000 457.0 136.657 6.910 -999.990 -999.990 1.367 ..P WKT 2011 02 17 16 04 55 31.3200 -97.3300 251.000 30.0 136.995 6.370 -999.990 -999.990 1.370 ..P WKT 2011 02 17 16 09 55 31.3200 -97.3300 251.000 122.0 137.333 6.270 -999.990 -999.990 1.373 ..P WKT 2011 02 17 16 14 55 31.3200 -97.3300 251.000 457.0 130.893 6.240 -999.990 -999.990 1.309 ..P WKT 2011 02 17 16 24 55 31.3200 -97.3300 251.000 30.0 128.276 6.210 -999.990 -999.990 1.283 ..P WKT 2011 02 17 16 29 55 31.3200 -97.3300 251.000 122.0 130.406 6.460 -999.990 -999.990 1.304 ..P WKT 2011 02 17 16 34 55 31.3200 -97.3300 251.000 457.0 132.875 6.160 -999.990 -999.990 1.329 ..P WKT 2011 02 17 16 39 55 31.3200 -97.3300 251.000 30.0 132.632 6.450 -999.990 -999.990 1.326 ..P WKT 2011 02 17 16 44 55 31.3200 -97.3300 251.000 122.0 135.101 6.360 -999.990 -999.990 1.351 ..P WKT 2011 02 17 16 49 55 31.3200 -97.3300 251.000 457.0 136.892 6.410 -999.990 -999.990 1.369 ..P WKT 2011 02 17 17 04 55 31.3200 -97.3300 251.000 30.0 135.461 6.370 -999.990 -999.990 1.355 ..P WKT 2011 02 17 17 09 55 31.3200 -97.3300 251.000 122.0 135.884 6.130 -999.990 -999.990 1.359 ..P WKT 2011 02 17 17 14 55 31.3200 -97.3300 251.000 457.0 135.968 6.440 -999.990 -999.990 1.360 ..P WKT 2011 02 17 17 19 55 31.3200 -97.3300 251.000 30.0 130.629 6.610 -999.990 -999.990 1.306 ..P WKT 2011 02 17 17 24 55 31.3200 -97.3300 251.000 122.0 135.458 6.100 -999.990 -999.990 1.355 ..P WKT 2011 02 17 17 29 55 31.3200 -97.3300 251.000 457.0 139.270 6.160 -999.990 -999.990 1.393 ..P WKT 2011 02 17 17 39 55 31.3200 -97.3300 251.000 30.0 141.773 6.160 -999.990 -999.990 1.418 ..P WKT 2011 02 17 17 44 55 31.3200 -97.3300 251.000 122.0 138.432 6.140 -999.990 -999.990 1.384 ..P WKT 2011 02 17 17 49 55 31.3200 -97.3300 251.000 457.0 142.546 6.560 -999.990 -999.990 1.425 ..P WKT 2011 02 17 17 54 55 31.3200 -97.3300 251.000 30.0 142.255 6.530 -999.990 -999.990 1.423 ..P WKT 2011 02 17 17 59 55 31.3200 -97.3300 251.000 122.0 141.117 6.570 -999.990 -999.990 1.411 ..P WKT 2011 02 17 18 04 55 31.3200 -97.3300 251.000 457.0 145.062 6.500 -999.990 -999.990 1.451 ..P WKT 2011 02 17 18 14 55 31.3200 -97.3300 251.000 30.0 138.839 7.720 -999.990 -999.990 1.388 ..P WKT 2011 02 17 18 19 55 31.3200 -97.3300 251.000 122.0 139.516 6.430 -999.990 -999.990 1.395 ..P WKT 2011 02 17 18 24 55 31.3200 -97.3300 251.000 457.0 131.721 6.450 -999.990 -999.990 1.317 ..P WKT 2011 02 17 18 29 55 31.3200 -97.3300 251.000 30.0 137.651 6.430 -999.990 -999.990 1.377 ..P WKT 2011 02 17 18 34 55 31.3200 -97.3300 251.000 122.0 136.804 6.700 -999.990 -999.990 1.368 ..P WKT 2011 02 17 18 39 55 31.3200 -97.3300 251.000 457.0 132.398 6.810 -999.990 -999.990 1.324 ..P WKT 2011 02 17 18 49 55 31.3200 -97.3300 251.000 30.0 134.768 6.110 -999.990 -999.990 1.348 ..P WKT 2011 02 17 18 54 55 31.3200 -97.3300 251.000 122.0 138.325 7.060 -999.990 -999.990 1.383 ..P WKT 2011 02 17 18 59 55 31.3200 -97.3300 251.000 457.0 133.580 6.420 -999.990 -999.990 1.336 ..P WKT 2011 02 17 19 04 55 31.3200 -97.3300 251.000 30.0 139.170 6.410 -999.990 -999.990 1.392 ..P WKT 2011 02 17 19 09 55 31.3200 -97.3300 251.000 122.0 139.678 6.280 -999.990 -999.990 1.397 ..P WKT 2011 02 17 19 14 55 31.3200 -97.3300 251.000 457.0 141.879 6.840 -999.990 -999.990 1.419 ..P WKT 2011 02 17 19 24 55 31.3200 -97.3300 251.000 30.0 129.414 6.200 -999.990 -999.990 1.294 ..P WKT 2011 02 17 19 29 55 31.3200 -97.3300 251.000 122.0 135.754 6.720 -999.990 -999.990 1.358 ..P WKT 2011 02 17 19 34 55 31.3200 -97.3300 251.000 457.0 134.471 6.650 -999.990 -999.990 1.345 ..P WKT 2011 02 17 19 39 55 31.3200 -97.3300 251.000 30.0 130.476 7.600 -999.990 -999.990 1.305 ..P WKT 2011 02 17 19 44 55 31.3200 -97.3300 251.000 122.0 131.735 8.850 -999.990 -999.990 1.317 ..P WKT 2011 02 17 19 49 55 31.3200 -97.3300 251.000 457.0 136.041 6.150 -999.990 -999.990 1.360 ..P WKT 2011 02 17 19 59 55 31.3200 -97.3300 251.000 30.0 134.587 6.390 -999.990 -999.990 1.346 ..P WKT 2011 02 17 20 04 55 31.3200 -97.3300 251.000 122.0 140.347 6.870 -999.990 -999.990 1.403 ..P WKT 2011 02 17 20 09 55 31.3200 -97.3300 251.000 457.0 136.958 7.200 -999.990 -999.990 1.370 ..P WKT 2011 02 17 20 14 55 31.3200 -97.3300 251.000 30.0 135.602 7.020 -999.990 -999.990 1.356 ..P WKT 2011 02 17 20 19 55 31.3200 -97.3300 251.000 122.0 138.989 6.900 -999.990 -999.990 1.390 ..P WKT 2011 02 17 20 24 55 31.3200 -97.3300 251.000 457.0 135.940 6.120 -999.990 -999.990 1.359 ..P WKT 2011 02 17 20 34 55 31.3200 -97.3300 251.000 30.0 139.519 6.460 -999.990 -999.990 1.395 ..P WKT 2011 02 17 20 39 55 31.3200 -97.3300 251.000 122.0 138.357 6.590 -999.990 -999.990 1.384 ..P WKT 2011 02 17 20 44 55 31.3200 -97.3300 251.000 457.0 131.775 6.940 -999.990 -999.990 1.318 ..P WKT 2011 02 17 20 49 55 31.3200 -97.3300 251.000 30.0 139.420 6.500 -999.990 -999.990 1.394 ..P WKT 2011 02 17 20 54 55 31.3200 -97.3300 251.000 122.0 143.000 6.310 -999.990 -999.990 1.430 ..P WKT 2011 02 17 20 59 55 31.3200 -97.3300 251.000 457.0 138.112 6.080 -999.990 -999.990 1.381 ..P WKT 2011 02 17 21 09 55 31.3200 -97.3300 251.000 30.0 133.077 5.830 -999.990 -999.990 1.331 ..P WKT 2011 02 17 21 14 55 31.3200 -97.3300 251.000 122.0 139.367 6.080 -999.990 -999.990 1.394 ..P WKT 2011 02 17 21 19 55 31.3200 -97.3300 251.000 457.0 130.754 6.020 -999.990 -999.990 1.308 ..P WKT 2011 02 17 21 24 55 31.3200 -97.3300 251.000 30.0 132.301 6.290 -999.990 -999.990 1.323 ..P WKT 2011 02 17 21 29 55 31.3200 -97.3300 251.000 122.0 134.188 6.470 -999.990 -999.990 1.342 ..P WKT 2011 02 17 21 34 55 31.3200 -97.3300 251.000 457.0 139.461 6.090 -999.990 -999.990 1.395 ..P WKT 2011 02 17 21 44 55 31.3200 -97.3300 251.000 30.0 134.742 5.860 -999.990 -999.990 1.347 ..P WKT 2011 02 17 21 49 55 31.3200 -97.3300 251.000 122.0 133.047 6.030 -999.990 -999.990 1.330 ..P WKT 2011 02 17 21 54 55 31.3200 -97.3300 251.000 457.0 136.434 6.370 -999.990 -999.990 1.364 ..P WKT 2011 02 17 21 59 55 31.3200 -97.3300 251.000 30.0 134.062 5.930 -999.990 -999.990 1.341 ..P WKT 2011 02 17 22 04 55 31.3200 -97.3300 251.000 122.0 140.497 6.370 -999.990 -999.990 1.405 ..P WKT 2011 02 17 22 09 55 31.3200 -97.3300 251.000 457.0 136.770 6.310 -999.990 -999.990 1.368 ..P WKT 2011 02 17 22 19 55 31.3200 -97.3300 251.000 30.0 137.107 6.340 -999.990 -999.990 1.371 ..P WKT 2011 02 17 22 24 55 31.3200 -97.3300 251.000 122.0 136.260 6.520 -999.990 -999.990 1.363 ..P WKT 2011 02 17 22 29 55 31.3200 -97.3300 251.000 457.0 131.856 6.840 -999.990 -999.990 1.319 ..P WKT 2011 02 17 22 34 55 31.3200 -97.3300 251.000 30.0 134.395 6.810 -999.990 -999.990 1.344 ..P WKT 2011 02 17 22 39 55 31.3200 -97.3300 251.000 122.0 132.024 6.510 -999.990 -999.990 1.320 ..P WKT 2011 02 17 22 44 55 31.3200 -97.3300 251.000 457.0 134.394 6.640 -999.990 -999.990 1.344 ..P WKT 2011 02 17 22 54 55 31.3200 -97.3300 251.000 30.0 128.079 6.860 -999.990 -999.990 1.281 ..P WKT 2011 02 17 22 59 55 31.3200 -97.3300 251.000 122.0 127.522 6.610 -999.990 -999.990 1.275 ..P WKT 2011 02 17 23 04 55 31.3200 -97.3300 251.000 457.0 131.706 6.130 -999.990 -999.990 1.317 ..P WKT 2011 02 17 23 09 55 31.3200 -97.3300 251.000 30.0 133.181 6.760 -999.990 -999.990 1.332 ..P WKT 2011 02 17 23 14 55 31.3200 -97.3300 251.000 122.0 132.962 6.820 -999.990 -999.990 1.330 ..P WKT 2011 02 17 23 19 55 31.3200 -97.3300 251.000 457.0 131.390 6.270 -999.990 -999.990 1.314 ..P WKT 2011 02 17 23 29 55 31.3200 -97.3300 251.000 30.0 129.223 6.630 -999.990 -999.990 1.292 ..P WKT 2011 02 17 23 34 55 31.3200 -97.3300 251.000 122.0 134.725 6.260 -999.990 -999.990 1.347 ..P WKT 2011 02 17 23 39 55 31.3200 -97.3300 251.000 457.0 134.132 6.340 -999.990 -999.990 1.341 ..P WKT 2011 02 17 23 44 55 31.3200 -97.3300 251.000 30.0 127.106 6.330 -999.990 -999.990 1.271 ..P WKT 2011 02 17 23 49 55 31.3200 -97.3300 251.000 122.0 130.914 6.200 -999.990 -999.990 1.309 ..P WKT 2011 02 18 00 09 55 31.3200 -97.3300 251.000 457.0 129.378 6.250 -999.990 -999.990 1.294 ..P WKT 2011 02 18 00 10 25 31.3200 -97.3300 251.000 457.0 133.499 6.380 -999.990 -999.990 1.335 ..P WKT 2011 02 18 00 10 55 31.3200 -97.3300 251.000 457.0 132.881 5.980 -999.990 -999.990 1.329 ..P WKT 2011 02 18 00 11 25 31.3200 -97.3300 251.000 457.0 128.878 6.050 -999.990 -999.990 1.289 ..P WKT 2011 02 18 00 11 55 31.3200 -97.3300 251.000 457.0 129.614 5.910 -999.990 -999.990 1.296 ..P WKT 2011 02 18 00 12 25 31.3200 -97.3300 251.000 457.0 126.627 5.860 -999.990 -999.990 1.266 ..P WKT 2011 02 18 00 12 55 31.3200 -97.3300 251.000 457.0 128.040 6.100 -999.990 -999.990 1.280 ..P WKT 2011 02 18 00 13 25 31.3200 -97.3300 251.000 457.0 128.776 6.130 -999.990 -999.990 1.288 ..P WKT 2011 02 18 00 13 55 31.3200 -97.3300 251.000 457.0 128.158 5.960 -999.990 -999.990 1.282 ..P WKT 2011 02 18 00 14 25 31.3200 -97.3300 251.000 457.0 130.924 5.950 -999.990 -999.990 1.309 ..P WKT 2011 02 18 00 14 55 31.3200 -97.3300 251.000 457.0 127.260 6.160 -999.990 -999.990 1.273 ..P WKT 2011 02 18 00 19 55 31.3200 -97.3300 251.000 30.0 132.588 7.400 -999.990 -999.990 1.326 ..P WKT 2011 02 18 00 24 55 31.3200 -97.3300 251.000 122.0 133.515 6.420 -999.990 -999.990 1.335 ..P WKT 2011 02 18 00 29 55 31.3200 -97.3300 251.000 457.0 130.044 6.160 -999.990 -999.990 1.300 ..P WKT 2011 02 18 00 34 55 31.3200 -97.3300 251.000 30.0 125.223 6.130 -999.990 -999.990 1.252 ..P WKT 2011 02 18 00 39 55 31.3200 -97.3300 251.000 122.0 131.899 6.370 -999.990 -999.990 1.319 ..P WKT 2011 02 18 00 44 55 31.3200 -97.3300 251.000 457.0 124.036 5.820 -999.990 -999.990 1.240 ..P WKT 2011 02 18 00 54 55 31.3200 -97.3300 251.000 30.0 132.822 6.340 -999.990 -999.990 1.328 ..P WKT 2011 02 18 00 59 55 31.3200 -97.3300 251.000 122.0 128.852 6.250 -999.990 -999.990 1.289 ..P WKT 2011 02 18 01 04 55 31.3200 -97.3300 251.000 457.0 129.275 6.680 -999.990 -999.990 1.293 ..P WKT 2011 02 18 01 09 55 31.3200 -97.3300 251.000 30.0 129.697 6.060 -999.990 -999.990 1.297 ..P WKT 2011 02 18 01 14 55 31.3200 -97.3300 251.000 122.0 133.159 5.920 -999.990 -999.990 1.332 ..P WKT 2011 02 18 01 19 55 31.3200 -97.3300 251.000 457.0 127.840 5.760 -999.990 -999.990 1.278 ..P WKT 2011 02 18 01 29 55 31.3200 -97.3300 251.000 30.0 127.238 6.040 -999.990 -999.990 1.272 ..P WKT 2011 02 18 01 34 55 31.3200 -97.3300 251.000 122.0 130.939 5.860 -999.990 -999.990 1.309 ..P WKT 2011 02 18 01 39 55 31.3200 -97.3300 251.000 457.0 121.985 6.460 -999.990 -999.990 1.220 ..P WKT 2011 02 18 01 44 55 31.3200 -97.3300 251.000 30.0 131.084 6.030 -999.990 -999.990 1.311 ..P WKT 2011 02 18 01 49 55 31.3200 -97.3300 251.000 122.0 132.420 6.460 -999.990 -999.990 1.324 ..P WKT 2011 02 18 01 54 55 31.3200 -97.3300 251.000 457.0 119.425 6.170 -999.990 -999.990 1.194 ..P WKT 2011 02 18 02 04 55 31.3200 -97.3300 251.000 30.0 126.918 6.390 -999.990 -999.990 1.269 ..P WKT 2011 02 18 02 09 55 31.3200 -97.3300 251.000 122.0 129.699 6.080 -999.990 -999.990 1.297 ..P WKT 2011 02 18 02 14 55 31.3200 -97.3300 251.000 457.0 126.919 5.990 -999.990 -999.990 1.269 ..P WKT 2011 02 18 02 19 55 31.3200 -97.3300 251.000 30.0 122.119 6.330 -999.990 -999.990 1.221 ..P WKT 2011 02 18 02 24 55 31.3200 -97.3300 251.000 122.0 128.100 7.630 -999.990 -999.990 1.281 ..P WKT 2011 02 18 02 29 55 31.3200 -97.3300 251.000 457.0 135.595 6.260 -999.990 -999.990 1.356 ..P WKT 2011 02 18 02 39 55 31.3200 -97.3300 251.000 30.0 133.188 5.980 -999.990 -999.990 1.332 ..P WKT 2011 02 18 02 44 55 31.3200 -97.3300 251.000 122.0 129.857 6.470 -999.990 -999.990 1.299 ..P WKT 2011 02 18 02 49 55 31.3200 -97.3300 251.000 457.0 125.854 6.710 -999.990 -999.990 1.259 ..P WKT 2011 02 18 02 54 55 31.3200 -97.3300 251.000 30.0 132.453 6.290 -999.990 -999.990 1.325 ..P WKT 2011 02 18 02 59 55 31.3200 -97.3300 251.000 122.0 130.470 5.990 -999.990 -999.990 1.305 ..P WKT 2011 02 18 03 04 55 31.3200 -97.3300 251.000 457.0 118.059 6.230 -999.990 -999.990 1.181 ..P WKT 2011 02 18 03 14 55 31.3200 -97.3300 251.000 30.0 127.239 6.030 -999.990 -999.990 1.272 ..P WKT 2011 02 18 03 19 55 31.3200 -97.3300 251.000 122.0 126.460 5.810 -999.990 -999.990 1.265 ..P WKT 2011 02 18 03 24 55 31.3200 -97.3300 251.000 457.0 123.158 5.740 -999.990 -999.990 1.232 ..P WKT 2011 02 18 03 29 55 31.3200 -97.3300 251.000 30.0 128.765 6.360 -999.990 -999.990 1.288 ..P WKT 2011 02 18 03 34 55 31.3200 -97.3300 251.000 122.0 125.130 5.470 -999.990 -999.990 1.251 ..P WKT 2011 02 18 03 39 55 31.3200 -97.3300 251.000 457.0 127.207 5.410 -999.990 -999.990 1.272 ..P WKT 2011 02 18 03 49 55 31.3200 -97.3300 251.000 30.0 128.503 5.440 -999.990 -999.990 1.285 ..P WKT 2011 02 18 03 54 55 31.3200 -97.3300 251.000 122.0 130.074 5.650 -999.990 -999.990 1.301 ..P WKT 2011 02 18 03 59 55 31.3200 -97.3300 251.000 457.0 133.324 6.340 -999.990 -999.990 1.333 ..P WKT 2011 02 18 04 04 55 31.3200 -97.3300 251.000 30.0 126.838 5.620 -999.990 -999.990 1.268 ..P WKT 2011 02 18 04 09 55 31.3200 -97.3300 251.000 122.0 133.108 5.450 -999.990 -999.990 1.331 ..P WKT 2011 02 18 04 14 55 31.3200 -97.3300 251.000 457.0 129.308 5.530 -999.990 -999.990 1.293 ..P WKT 2011 02 18 04 24 55 31.3200 -97.3300 251.000 30.0 125.450 5.440 -999.990 -999.990 1.254 ..P WKT 2011 02 18 04 29 55 31.3200 -97.3300 251.000 122.0 132.771 5.180 -999.990 -999.990 1.328 ..P WKT 2011 02 18 04 34 55 31.3200 -97.3300 251.000 457.0 126.004 7.250 -999.990 -999.990 1.260 ..P WKT 2011 02 18 04 39 55 31.3200 -97.3300 251.000 30.0 126.950 5.790 -999.990 -999.990 1.270 ..P WKT 2011 02 18 04 44 55 31.3200 -97.3300 251.000 122.0 137.283 5.550 -999.990 -999.990 1.373 ..P WKT 2011 02 18 04 49 55 31.3200 -97.3300 251.000 457.0 137.222 5.190 -999.990 -999.990 1.372 ..P WKT 2011 02 18 05 04 55 31.3200 -97.3300 251.000 30.0 130.309 6.630 -999.990 -999.990 1.303 ..P WKT 2011 02 18 05 09 55 31.3200 -97.3300 251.000 122.0 142.627 6.250 -999.990 -999.990 1.426 ..P WKT 2011 02 18 05 14 55 31.3200 -97.3300 251.000 457.0 132.169 5.850 -999.990 -999.990 1.322 ..P WKT 2011 02 18 05 19 55 31.3200 -97.3300 251.000 30.0 142.474 5.790 -999.990 -999.990 1.425 ..P WKT 2011 02 18 05 24 55 31.3200 -97.3300 251.000 122.0 145.410 5.870 -999.990 -999.990 1.454 ..P WKT 2011 02 18 05 29 55 31.3200 -97.3300 251.000 457.0 134.622 5.780 -999.990 -999.990 1.346 ..P WKT 2011 02 18 05 39 55 31.3200 -97.3300 251.000 30.0 143.639 5.370 -999.990 -999.990 1.436 ..P WKT 2011 02 18 05 44 55 31.3200 -97.3300 251.000 122.0 147.544 5.790 -999.990 -999.990 1.475 ..P WKT 2011 02 18 05 49 55 31.3200 -97.3300 251.000 457.0 135.894 5.860 -999.990 -999.990 1.359 ..P WKT 2011 02 18 05 54 55 31.3200 -97.3300 251.000 30.0 137.123 6.320 -999.990 -999.990 1.371 ..P WKT 2011 02 18 05 59 55 31.3200 -97.3300 251.000 122.0 145.541 6.000 -999.990 -999.990 1.455 ..P WKT 2011 02 18 06 04 55 31.3200 -97.3300 251.000 457.0 139.414 5.230 -999.990 -999.990 1.394 ..P WKT 2011 02 18 06 14 55 31.3200 -97.3300 251.000 30.0 145.689 6.310 -999.990 -999.990 1.457 ..P WKT 2011 02 18 06 19 55 31.3200 -97.3300 251.000 122.0 139.040 5.900 -999.990 -999.990 1.390 ..P WKT 2011 02 18 06 24 55 31.3200 -97.3300 251.000 457.0 137.236 5.770 -999.990 -999.990 1.372 ..P WKT 2011 02 18 06 29 55 31.3200 -97.3300 251.000 30.0 130.257 5.830 -999.990 -999.990 1.303 ..P WKT 2011 02 18 06 34 55 31.3200 -97.3300 251.000 122.0 130.793 5.990 -999.990 -999.990 1.308 ..P WKT 2011 02 18 06 39 55 31.3200 -97.3300 251.000 457.0 125.654 5.880 -999.990 -999.990 1.257 ..P WKT 2011 02 18 06 49 55 31.3200 -97.3300 251.000 30.0 136.932 6.500 -999.990 -999.990 1.369 ..P WKT 2011 02 18 06 54 55 31.3200 -97.3300 251.000 122.0 136.658 5.980 -999.990 -999.990 1.367 ..P WKT 2011 02 18 06 59 55 31.3200 -97.3300 251.000 457.0 128.208 6.390 -999.990 -999.990 1.282 ..P WKT 2011 02 18 07 04 55 31.3200 -97.3300 251.000 30.0 131.937 5.720 -999.990 -999.990 1.319 ..P WKT 2011 02 18 07 09 55 31.3200 -97.3300 251.000 122.0 128.828 5.530 -999.990 -999.990 1.288 ..P WKT 2011 02 18 07 14 55 31.3200 -97.3300 251.000 457.0 133.056 5.560 -999.990 -999.990 1.331 ..P WKT 2011 02 18 07 24 55 31.3200 -97.3300 251.000 30.0 134.174 5.630 -999.990 -999.990 1.342 ..P WKT 2011 02 18 07 29 55 31.3200 -97.3300 251.000 122.0 132.233 5.160 -999.990 -999.990 1.322 ..P WKT 2011 02 18 07 34 55 31.3200 -97.3300 251.000 457.0 126.794 5.240 -999.990 -999.990 1.268 ..P WKT 2011 02 18 07 39 55 31.3200 -97.3300 251.000 30.0 127.521 5.010 -999.990 -999.990 1.275 ..P WKT 2011 02 18 07 44 55 31.3200 -97.3300 251.000 122.0 125.582 4.980 -999.990 -999.990 1.256 ..P WKT 2011 02 18 07 49 55 31.3200 -97.3300 251.000 457.0 123.311 4.670 -999.990 -999.990 1.233 ..P WKT 2011 02 18 07 59 55 31.3200 -97.3300 251.000 30.0 127.737 5.470 -999.990 -999.990 1.277 ..P WKT 2011 02 18 08 04 55 31.3200 -97.3300 251.000 122.0 128.106 5.050 -999.990 -999.990 1.281 ..P WKT 2011 02 18 08 09 55 31.3200 -97.3300 251.000 457.0 126.479 4.910 -999.990 -999.990 1.265 ..P WKT 2011 02 18 08 14 55 31.3200 -97.3300 251.000 30.0 119.193 5.080 -999.990 -999.990 1.192 ..P WKT 2011 02 18 08 19 55 31.3200 -97.3300 251.000 122.0 126.218 5.870 -999.990 -999.990 1.262 ..P WKT 2011 02 18 08 24 55 31.3200 -97.3300 251.000 457.0 125.257 4.730 -999.990 -999.990 1.253 ..P WKT 2011 02 18 08 34 55 31.3200 -97.3300 251.000 30.0 122.813 5.650 -999.990 -999.990 1.228 ..P WKT 2011 02 18 08 39 55 31.3200 -97.3300 251.000 122.0 125.320 4.970 -999.990 -999.990 1.253 ..P WKT 2011 02 18 08 44 55 31.3200 -97.3300 251.000 457.0 127.493 5.210 -999.990 -999.990 1.275 ..P WKT 2011 02 18 08 49 55 31.3200 -97.3300 251.000 30.0 120.691 5.250 -999.990 -999.990 1.207 ..P WKT 2011 02 18 08 54 55 31.3200 -97.3300 251.000 122.0 120.539 4.920 -999.990 -999.990 1.205 ..P WKT 2011 02 18 08 59 55 31.3200 -97.3300 251.000 457.0 121.716 5.070 -999.990 -999.990 1.217 ..P WKT 2011 02 18 09 09 55 31.3200 -97.3300 251.000 30.0 120.818 5.490 -999.990 -999.990 1.208 ..P WKT 2011 02 18 09 14 55 31.3200 -97.3300 251.000 122.0 121.400 5.680 -999.990 -999.990 1.214 ..P WKT 2011 02 18 09 19 55 31.3200 -97.3300 251.000 457.0 119.990 5.620 -999.990 -999.990 1.200 ..P WKT 2011 02 18 09 24 55 31.3200 -97.3300 251.000 30.0 118.582 5.420 -999.990 -999.990 1.186 ..P WKT 2011 02 18 09 29 55 31.3200 -97.3300 251.000 122.0 120.658 5.340 -999.990 -999.990 1.207 ..P WKT 2011 02 18 09 34 55 31.3200 -97.3300 251.000 457.0 121.407 6.150 -999.990 -999.990 1.214 ..P WKT 2011 02 18 09 44 55 31.3200 -97.3300 251.000 30.0 119.751 5.070 -999.990 -999.990 1.198 ..P WKT 2011 02 18 09 49 55 31.3200 -97.3300 251.000 122.0 124.148 4.890 -999.990 -999.990 1.241 ..P WKT 2011 02 18 09 54 55 31.3200 -97.3300 251.000 457.0 122.574 5.120 -999.990 -999.990 1.226 ..P WKT 2011 02 18 09 59 55 31.3200 -97.3300 251.000 30.0 120.006 5.300 -999.990 -999.990 1.200 ..P WKT 2011 02 18 10 04 55 31.3200 -97.3300 251.000 122.0 134.181 4.970 -999.990 -999.990 1.342 ..P WKT 2011 02 18 10 09 55 31.3200 -97.3300 251.000 457.0 127.965 5.700 -999.990 -999.990 1.280 ..P WKT 2011 02 18 10 19 55 31.3200 -97.3300 251.000 30.0 124.558 5.150 -999.990 -999.990 1.246 ..P WKT 2011 02 18 10 24 55 31.3200 -97.3300 251.000 122.0 122.228 4.950 -999.990 -999.990 1.222 ..P WKT 2011 02 18 10 29 55 31.3200 -97.3300 251.000 457.0 129.504 5.130 -999.990 -999.990 1.295 ..P WKT 2011 02 18 10 34 55 31.3200 -97.3300 251.000 30.0 121.876 5.320 -999.990 -999.990 1.219 ..P WKT 2011 02 18 10 39 55 31.3200 -97.3300 251.000 122.0 122.362 6.060 -999.990 -999.990 1.224 ..P WKT 2011 02 18 10 44 55 31.3200 -97.3300 251.000 457.0 121.524 5.620 -999.990 -999.990 1.215 ..P WKT 2011 02 18 10 54 55 31.3200 -97.3300 251.000 30.0 118.643 5.470 -999.990 -999.990 1.186 ..P WKT 2011 02 18 10 59 55 31.3200 -97.3300 251.000 122.0 126.528 5.400 -999.990 -999.990 1.265 ..P WKT 2011 02 18 11 04 55 31.3200 -97.3300 251.000 457.0 128.123 5.410 -999.990 -999.990 1.281 ..P WKT 2011 02 18 11 09 55 31.3200 -97.3300 251.000 30.0 128.396 4.840 -999.990 -999.990 1.284 ..P WKT 2011 02 18 11 14 55 31.3200 -97.3300 251.000 122.0 128.337 4.850 -999.990 -999.990 1.283 ..P WKT 2011 02 18 11 19 55 31.3200 -97.3300 251.000 457.0 128.278 5.330 -999.990 -999.990 1.283 ..P WKT 2011 02 18 11 29 55 31.3200 -97.3300 251.000 30.0 126.184 4.900 -999.990 -999.990 1.262 ..P WKT 2011 02 18 11 34 55 31.3200 -97.3300 251.000 122.0 128.776 5.250 -999.990 -999.990 1.288 ..P WKT 2011 02 18 11 39 55 31.3200 -97.3300 251.000 457.0 133.018 4.920 -999.990 -999.990 1.330 ..P WKT 2011 02 18 11 44 55 31.3200 -97.3300 251.000 30.0 130.653 4.930 -999.990 -999.990 1.307 ..P WKT 2011 02 18 11 49 55 31.3200 -97.3300 251.000 122.0 129.609 4.720 -999.990 -999.990 1.296 ..P WKT 2011 02 18 12 09 55 31.3200 -97.3300 251.000 457.0 132.858 4.810 -999.990 -999.990 1.329 ..P WKT 2011 02 18 12 10 25 31.3200 -97.3300 251.000 457.0 133.159 4.950 -999.990 -999.990 1.332 ..P WKT 2011 02 18 12 10 55 31.3200 -97.3300 251.000 457.0 129.166 5.440 -999.990 -999.990 1.292 ..P WKT 2011 02 18 12 11 25 31.3200 -97.3300 251.000 457.0 127.155 4.660 -999.990 -999.990 1.272 ..P WKT 2011 02 18 12 11 55 31.3200 -97.3300 251.000 457.0 131.750 4.750 -999.990 -999.990 1.318 ..P WKT 2011 02 18 12 12 25 31.3200 -97.3300 251.000 457.0 135.025 4.960 -999.990 -999.990 1.350 ..P WKT 2011 02 18 12 12 55 31.3200 -97.3300 251.000 457.0 129.050 5.270 -999.990 -999.990 1.291 ..P WKT 2011 02 18 12 13 25 31.3200 -97.3300 251.000 457.0 130.342 5.960 -999.990 -999.990 1.303 ..P WKT 2011 02 18 12 13 55 31.3200 -97.3300 251.000 457.0 133.947 4.770 -999.990 -999.990 1.339 ..P WKT 2011 02 18 12 14 25 31.3200 -97.3300 251.000 457.0 135.901 4.980 -999.990 -999.990 1.359 ..P WKT 2011 02 18 12 14 55 31.3200 -97.3300 251.000 457.0 135.210 4.890 -999.990 -999.990 1.352 ..P WKT 2011 02 18 12 19 55 31.3200 -97.3300 251.000 30.0 128.311 4.730 -999.990 -999.990 1.283 ..P WKT 2011 02 18 12 24 55 31.3200 -97.3300 251.000 122.0 123.392 5.150 -999.990 -999.990 1.234 ..P WKT 2011 02 18 12 29 55 31.3200 -97.3300 251.000 457.0 135.001 4.830 -999.990 -999.990 1.350 ..P WKT 2011 02 18 12 34 55 31.3200 -97.3300 251.000 30.0 124.459 4.910 -999.990 -999.990 1.245 ..P WKT 2011 02 18 12 39 55 31.3200 -97.3300 251.000 122.0 122.514 5.630 -999.990 -999.990 1.225 ..P WKT 2011 02 18 12 44 55 31.3200 -97.3300 251.000 457.0 134.460 5.000 -999.990 -999.990 1.345 ..P WKT 2011 02 18 12 54 55 31.3200 -97.3300 251.000 30.0 121.280 5.210 -999.990 -999.990 1.213 ..P WKT 2011 02 18 12 59 55 31.3200 -97.3300 251.000 122.0 127.251 4.890 -999.990 -999.990 1.273 ..P WKT 2011 02 18 13 04 55 31.3200 -97.3300 251.000 457.0 129.916 4.880 -999.990 -999.990 1.299 ..P WKT 2011 02 18 13 09 55 31.3200 -97.3300 251.000 30.0 130.593 4.720 -999.990 -999.990 1.306 ..P WKT 2011 02 18 13 14 55 31.3200 -97.3300 251.000 122.0 128.622 4.590 -999.990 -999.990 1.286 ..P WKT 2011 02 18 13 19 55 31.3200 -97.3300 251.000 457.0 134.600 4.820 -999.990 -999.990 1.346 ..P WKT 2011 02 18 13 29 55 31.3200 -97.3300 251.000 30.0 129.615 4.640 -999.990 -999.990 1.296 ..P WKT 2011 02 18 13 34 55 31.3200 -97.3300 251.000 122.0 130.246 4.430 -999.990 -999.990 1.302 ..P WKT 2011 02 18 13 39 55 31.3200 -97.3300 251.000 457.0 138.504 5.640 -999.990 -999.990 1.385 ..P WKT 2011 02 18 13 44 55 31.3200 -97.3300 251.000 30.0 126.867 4.820 -999.990 -999.990 1.269 ..P WKT 2011 02 18 13 49 55 31.3200 -97.3300 251.000 122.0 133.136 4.200 -999.990 -999.990 1.331 ..P WKT 2011 02 18 13 54 55 31.3200 -97.3300 251.000 457.0 133.935 4.350 -999.990 -999.990 1.339 ..P WKT 2011 02 18 14 04 55 31.3200 -97.3300 251.000 30.0 129.131 5.980 -999.990 -999.990 1.291 ..P WKT 2011 02 18 14 09 55 31.3200 -97.3300 251.000 122.0 134.981 4.400 -999.990 -999.990 1.350 ..P WKT 2011 02 18 14 14 55 31.3200 -97.3300 251.000 457.0 128.380 4.430 -999.990 -999.990 1.284 ..P WKT 2011 02 18 14 19 55 31.3200 -97.3300 251.000 30.0 128.419 4.600 -999.990 -999.990 1.284 ..P WKT 2011 02 18 14 24 55 31.3200 -97.3300 251.000 122.0 131.614 5.280 -999.990 -999.990 1.316 ..P WKT 2011 02 18 14 29 55 31.3200 -97.3300 251.000 457.0 130.491 4.660 -999.990 -999.990 1.305 ..P WKT 2011 02 18 14 39 55 31.3200 -97.3300 251.000 30.0 132.897 4.300 -999.990 -999.990 1.329 ..P WKT 2011 02 18 14 44 55 31.3200 -97.3300 251.000 122.0 146.068 4.470 -999.990 -999.990 1.461 ..P WKT 2011 02 18 14 49 55 31.3200 -97.3300 251.000 457.0 127.823 4.780 -999.990 -999.990 1.278 ..P WKT 2011 02 18 14 54 55 31.3200 -97.3300 251.000 30.0 137.174 4.990 -999.990 -999.990 1.372 ..P WKT 2011 02 18 14 59 55 31.3200 -97.3300 251.000 122.0 135.219 5.160 -999.990 -999.990 1.352 ..P WKT 2011 02 18 15 04 55 31.3200 -97.3300 251.000 457.0 132.265 4.530 -999.990 -999.990 1.323 ..P WKT 2011 02 18 15 14 55 31.3200 -97.3300 251.000 30.0 142.355 4.400 -999.990 -999.990 1.424 ..P WKT 2011 02 18 15 19 55 31.3200 -97.3300 251.000 122.0 133.764 4.340 -999.990 -999.990 1.338 ..P WKT 2011 02 18 15 24 55 31.3200 -97.3300 251.000 457.0 129.666 4.380 -999.990 -999.990 1.297 ..P WKT 2011 02 18 15 29 55 31.3200 -97.3300 251.000 30.0 139.555 5.490 -999.990 -999.990 1.396 ..P WKT 2011 02 18 15 34 55 31.3200 -97.3300 251.000 122.0 130.792 4.670 -999.990 -999.990 1.308 ..P WKT 2011 02 18 15 39 55 31.3200 -97.3300 251.000 457.0 128.023 4.530 -999.990 -999.990 1.280 ..P WKT 2011 02 18 15 49 55 31.3200 -97.3300 251.000 30.0 131.292 4.100 -999.990 -999.990 1.313 ..P WKT 2011 02 18 15 54 55 31.3200 -97.3300 251.000 122.0 139.001 4.710 -999.990 -999.990 1.390 ..P WKT 2011 02 18 15 59 55 31.3200 -97.3300 251.000 457.0 127.037 4.880 -999.990 -999.990 1.270 ..P WKT 2011 02 18 16 04 55 31.3200 -97.3300 251.000 30.0 130.411 5.120 -999.990 -999.990 1.304 ..P WKT 2011 02 18 16 09 55 31.3200 -97.3300 251.000 122.0 138.458 4.550 -999.990 -999.990 1.385 ..P WKT 2011 02 18 16 14 55 31.3200 -97.3300 251.000 457.0 128.155 3.880 -999.990 -999.990 1.282 ..P WKT 2011 02 18 16 24 55 31.3200 -97.3300 251.000 30.0 128.997 5.000 -999.990 -999.990 1.290 ..P WKT 2011 02 18 16 29 55 31.3200 -97.3300 251.000 122.0 125.459 4.970 -999.990 -999.990 1.255 ..P WKT 2011 02 18 16 34 55 31.3200 -97.3300 251.000 457.0 129.267 5.010 -999.990 -999.990 1.293 ..P WKT 2011 02 18 16 39 55 31.3200 -97.3300 251.000 30.0 126.395 4.790 -999.990 -999.990 1.264 ..P WKT 2011 02 18 16 44 55 31.3200 -97.3300 251.000 122.0 131.876 4.280 -999.990 -999.990 1.319 ..P WKT 2011 02 18 16 49 55 31.3200 -97.3300 251.000 457.0 133.348 4.490 -999.990 -999.990 1.333 ..P WKT 2011 02 18 17 04 55 31.3200 -97.3300 251.000 30.0 128.507 4.580 -999.990 -999.990 1.285 ..P WKT 2011 02 18 17 09 55 31.3200 -97.3300 251.000 122.0 135.382 4.690 -999.990 -999.990 1.354 ..P WKT 2011 02 18 17 14 55 31.3200 -97.3300 251.000 457.0 129.046 5.280 -999.990 -999.990 1.290 ..P WKT 2011 02 18 17 19 55 31.3200 -97.3300 251.000 30.0 125.718 4.310 -999.990 -999.990 1.257 ..P WKT 2011 02 18 17 24 55 31.3200 -97.3300 251.000 122.0 132.597 5.120 -999.990 -999.990 1.326 ..P WKT 2011 02 18 17 29 55 31.3200 -97.3300 251.000 457.0 126.257 5.300 -999.990 -999.990 1.263 ..P WKT 2011 02 18 17 39 55 31.3200 -97.3300 251.000 30.0 126.265 4.880 -999.990 -999.990 1.263 ..P WKT 2011 02 18 17 44 55 31.3200 -97.3300 251.000 122.0 130.276 5.500 -999.990 -999.990 1.303 ..P WKT 2011 02 18 17 49 55 31.3200 -97.3300 251.000 457.0 129.431 4.220 -999.990 -999.990 1.294 ..P WKT 2011 02 18 17 54 55 31.3200 -97.3300 251.000 30.0 132.605 4.460 -999.990 -999.990 1.326 ..P WKT 2011 02 18 17 59 55 31.3200 -97.3300 251.000 122.0 133.101 4.530 -999.990 -999.990 1.331 ..P WKT 2011 02 18 18 04 55 31.3200 -97.3300 251.000 457.0 139.463 4.590 -999.990 -999.990 1.395 ..P WKT 2011 02 18 18 14 55 31.3200 -97.3300 251.000 30.0 140.049 4.940 -999.990 -999.990 1.400 ..P WKT 2011 02 18 18 19 55 31.3200 -97.3300 251.000 122.0 138.127 4.850 -999.990 -999.990 1.381 ..P WKT 2011 02 18 18 24 55 31.3200 -97.3300 251.000 457.0 142.410 4.700 -999.990 -999.990 1.424 ..P WKT 2011 02 18 18 29 55 31.3200 -97.3300 251.000 30.0 136.460 4.500 -999.990 -999.990 1.365 ..P WKT 2011 02 18 18 34 55 31.3200 -97.3300 251.000 122.0 142.088 4.630 -999.990 -999.990 1.421 ..P WKT 2011 02 18 18 39 55 31.3200 -97.3300 251.000 457.0 140.332 4.680 -999.990 -999.990 1.403 ..P WKT 2011 02 18 18 49 55 31.3200 -97.3300 251.000 30.0 142.407 5.360 -999.990 -999.990 1.424 ..P WKT 2011 02 18 18 54 55 31.3200 -97.3300 251.000 122.0 144.057 3.860 -999.990 -999.990 1.441 ..P WKT 2011 02 18 18 59 55 31.3200 -97.3300 251.000 457.0 140.836 5.490 -999.990 -999.990 1.408 ..P WKT 2011 02 18 19 04 55 31.3200 -97.3300 251.000 30.0 144.334 3.980 -999.990 -999.990 1.443 ..P WKT 2011 02 18 19 09 55 31.3200 -97.3300 251.000 122.0 146.826 4.380 -999.990 -999.990 1.468 ..P WKT 2011 02 18 19 14 55 31.3200 -97.3300 251.000 457.0 139.905 5.690 -999.990 -999.990 1.399 ..P WKT 2011 02 18 19 24 55 31.3200 -97.3300 251.000 30.0 140.086 3.630 -999.990 -999.990 1.401 ..P WKT 2011 02 18 19 29 55 31.3200 -97.3300 251.000 122.0 143.829 3.500 -999.990 -999.990 1.438 ..P WKT 2011 02 18 19 34 55 31.3200 -97.3300 251.000 457.0 141.516 4.080 -999.990 -999.990 1.415 ..P WKT 2011 02 18 19 39 55 31.3200 -97.3300 251.000 30.0 150.645 4.220 -999.990 -999.990 1.506 ..P WKT 2011 02 18 19 44 55 31.3200 -97.3300 251.000 122.0 144.630 4.510 -999.990 -999.990 1.446 ..P WKT 2011 02 18 19 49 55 31.3200 -97.3300 251.000 457.0 144.674 4.090 -999.990 -999.990 1.447 ..P WKT 2011 02 18 19 59 55 31.3200 -97.3300 251.000 30.0 146.251 4.090 -999.990 -999.990 1.463 ..P WKT 2011 02 18 20 04 55 31.3200 -97.3300 251.000 122.0 144.755 4.020 -999.990 -999.990 1.448 ..P WKT 2011 02 18 20 09 55 31.3200 -97.3300 251.000 457.0 141.572 4.880 -999.990 -999.990 1.416 ..P WKT 2011 02 18 20 14 55 31.3200 -97.3300 251.000 30.0 147.826 4.400 -999.990 -999.990 1.478 ..P WKT 2011 02 18 20 19 55 31.3200 -97.3300 251.000 122.0 153.745 4.270 -999.990 -999.990 1.537 ..P WKT 2011 02 18 20 24 55 31.3200 -97.3300 251.000 457.0 152.586 3.900 -999.990 -999.990 1.526 ..P WKT 2011 02 18 20 34 55 31.3200 -97.3300 251.000 30.0 143.182 4.680 -999.990 -999.990 1.432 ..P WKT 2011 02 18 20 39 55 31.3200 -97.3300 251.000 122.0 141.683 4.160 -999.990 -999.990 1.417 ..P WKT 2011 02 18 20 44 55 31.3200 -97.3300 251.000 457.0 133.434 4.660 -999.990 -999.990 1.334 ..P WKT 2011 02 18 20 49 55 31.3200 -97.3300 251.000 30.0 145.770 3.730 -999.990 -999.990 1.458 ..P WKT 2011 02 18 20 54 55 31.3200 -97.3300 251.000 122.0 145.958 4.000 -999.990 -999.990 1.460 ..P WKT 2011 02 18 20 59 55 31.3200 -97.3300 251.000 457.0 141.757 3.470 -999.990 -999.990 1.418 ..P WKT 2011 02 18 21 09 55 31.3200 -97.3300 251.000 30.0 139.164 3.730 -999.990 -999.990 1.392 ..P WKT 2011 02 18 21 14 55 31.3200 -97.3300 251.000 122.0 139.085 4.240 -999.990 -999.990 1.391 ..P WKT 2011 02 18 21 19 55 31.3200 -97.3300 251.000 457.0 140.865 4.920 -999.990 -999.990 1.409 ..P WKT 2011 02 18 21 24 55 31.3200 -97.3300 251.000 30.0 131.322 4.910 -999.990 -999.990 1.313 ..P WKT 2011 02 18 21 29 55 31.3200 -97.3300 251.000 122.0 138.004 5.730 -999.990 -999.990 1.380 ..P WKT 2011 02 18 21 34 55 31.3200 -97.3300 251.000 457.0 133.191 5.810 -999.990 -999.990 1.332 ..P WKT 2011 02 18 21 44 55 31.3200 -97.3300 251.000 30.0 137.260 6.780 -999.990 -999.990 1.373 ..P WKT 2011 02 18 21 49 55 31.3200 -97.3300 251.000 122.0 141.918 5.910 -999.990 -999.990 1.419 ..P WKT 2011 02 18 21 54 55 31.3200 -97.3300 251.000 457.0 132.871 5.510 -999.990 -999.990 1.329 ..P WKT 2011 02 18 21 59 55 31.3200 -97.3300 251.000 30.0 134.145 4.650 -999.990 -999.990 1.341 ..P WKT 2011 02 18 22 04 55 31.3200 -97.3300 251.000 122.0 141.006 4.040 -999.990 -999.990 1.410 ..P WKT 2011 02 18 22 09 55 31.3200 -97.3300 251.000 457.0 136.186 4.250 -999.990 -999.990 1.362 ..P WKT 2011 02 18 22 19 55 31.3200 -97.3300 251.000 30.0 136.826 3.430 -999.990 -999.990 1.368 ..P WKT 2011 02 18 22 24 55 31.3200 -97.3300 251.000 122.0 144.323 4.490 -999.990 -999.990 1.443 ..P WKT 2011 02 18 22 29 55 31.3200 -97.3300 251.000 457.0 132.334 6.270 -999.990 -999.990 1.323 ..P WKT 2011 02 18 22 34 55 31.3200 -97.3300 251.000 30.0 129.832 3.800 -999.990 -999.990 1.298 ..P WKT 2011 02 18 22 39 55 31.3200 -97.3300 251.000 122.0 131.906 4.590 -999.990 -999.990 1.319 ..P WKT 2011 02 18 22 44 55 31.3200 -97.3300 251.000 457.0 129.912 4.300 -999.990 -999.990 1.299 ..P WKT 2011 02 18 22 54 55 31.3200 -97.3300 251.000 30.0 124.200 4.620 -999.990 -999.990 1.242 ..P WKT 2011 02 18 22 59 55 31.3200 -97.3300 251.000 122.0 132.530 4.340 -999.990 -999.990 1.325 ..P WKT 2011 02 18 23 04 55 31.3200 -97.3300 251.000 457.0 126.946 6.460 -999.990 -999.990 1.269 ..P WKT 2011 02 18 23 09 55 31.3200 -97.3300 251.000 30.0 119.492 4.160 -999.990 -999.990 1.195 ..P WKT 2011 02 18 23 14 55 31.3200 -97.3300 251.000 122.0 127.146 4.570 -999.990 -999.990 1.271 ..P WKT 2011 02 18 23 19 55 31.3200 -97.3300 251.000 457.0 124.105 3.820 -999.990 -999.990 1.241 ..P WKT 2011 02 18 23 29 55 31.3200 -97.3300 251.000 30.0 125.603 3.420 -999.990 -999.990 1.256 ..P WKT 2011 02 18 23 34 55 31.3200 -97.3300 251.000 122.0 117.571 3.310 -999.990 -999.990 1.176 ..P WKT 2011 02 18 23 39 55 31.3200 -97.3300 251.000 457.0 122.113 3.780 -999.990 -999.990 1.221 ..P WKT 2011 02 18 23 44 55 31.3200 -97.3300 251.000 30.0 126.317 3.990 -999.990 -999.990 1.263 ..P WKT 2011 02 18 23 49 55 31.3200 -97.3300 251.000 122.0 129.502 3.470 -999.990 -999.990 1.295 ..P WKT 2011 02 19 00 09 55 31.3200 -97.3300 251.000 457.0 124.770 4.130 -999.990 -999.990 1.248 ..P WKT 2011 02 19 00 10 25 31.3200 -97.3300 251.000 457.0 125.424 3.590 -999.990 -999.990 1.254 ..P WKT 2011 02 19 00 10 55 31.3200 -97.3300 251.000 457.0 122.338 3.580 -999.990 -999.990 1.223 ..P WKT 2011 02 19 00 11 25 31.3200 -97.3300 251.000 457.0 120.953 3.650 -999.990 -999.990 1.210 ..P WKT 2011 02 19 00 11 55 31.3200 -97.3300 251.000 457.0 120.247 3.950 -999.990 -999.990 1.202 ..P WKT 2011 02 19 00 12 25 31.3200 -97.3300 251.000 457.0 120.902 3.840 -999.990 -999.990 1.209 ..P WKT 2011 02 19 00 12 55 31.3200 -97.3300 251.000 457.0 117.816 3.830 -999.990 -999.990 1.178 ..P WKT 2011 02 19 00 13 25 31.3200 -97.3300 251.000 457.0 118.472 3.680 -999.990 -999.990 1.185 ..P WKT 2011 02 19 00 13 55 31.3200 -97.3300 251.000 457.0 121.847 3.850 -999.990 -999.990 1.218 ..P WKT 2011 02 19 00 14 25 31.3200 -97.3300 251.000 457.0 126.583 3.620 -999.990 -999.990 1.266 ..P WKT 2011 02 19 00 14 55 31.3200 -97.3300 251.000 457.0 119.756 5.230 -999.990 -999.990 1.198 ..P WKT 2011 02 19 00 19 55 31.3200 -97.3300 251.000 30.0 122.225 4.000 -999.990 -999.990 1.222 ..P WKT 2011 02 19 00 24 55 31.3200 -97.3300 251.000 122.0 122.312 3.920 -999.990 -999.990 1.223 ..P WKT 2011 02 19 00 29 55 31.3200 -97.3300 251.000 457.0 116.283 3.870 -999.990 -999.990 1.163 ..P WKT 2011 02 19 00 34 55 31.3200 -97.3300 251.000 30.0 122.828 6.910 -999.990 -999.990 1.228 ..P WKT 2011 02 19 00 39 55 31.3200 -97.3300 251.000 122.0 121.557 4.010 -999.990 -999.990 1.216 ..P WKT 2011 02 19 00 44 55 31.3200 -97.3300 251.000 457.0 121.985 4.550 -999.990 -999.990 1.220 ..P WKT 2011 02 19 00 54 55 31.3200 -97.3300 251.000 30.0 119.840 5.530 -999.990 -999.990 1.198 ..P WKT 2011 02 19 00 59 55 31.3200 -97.3300 251.000 122.0 126.435 3.680 -999.990 -999.990 1.264 ..P WKT 2011 02 19 01 04 55 31.3200 -97.3300 251.000 457.0 123.694 3.780 -999.990 -999.990 1.237 ..P WKT 2011 02 19 01 09 55 31.3200 -97.3300 251.000 30.0 121.632 3.750 -999.990 -999.990 1.216 ..P WKT 2011 02 19 01 14 55 31.3200 -97.3300 251.000 122.0 132.633 4.080 -999.990 -999.990 1.326 ..P WKT 2011 02 19 01 19 55 31.3200 -97.3300 251.000 457.0 123.108 2.980 -999.990 -999.990 1.231 ..P WKT 2011 02 19 01 29 55 31.3200 -97.3300 251.000 30.0 129.476 3.420 -999.990 -999.990 1.295 ..P WKT 2011 02 19 01 34 55 31.3200 -97.3300 251.000 122.0 128.577 3.410 -999.990 -999.990 1.286 ..P WKT 2011 02 19 01 39 55 31.3200 -97.3300 251.000 457.0 118.019 3.230 -999.990 -999.990 1.180 ..P WKT 2011 02 19 01 44 55 31.3200 -97.3300 251.000 30.0 129.662 3.530 -999.990 -999.990 1.297 ..P WKT 2011 02 19 01 49 55 31.3200 -97.3300 251.000 122.0 126.392 3.050 -999.990 -999.990 1.264 ..P WKT 2011 02 19 01 54 55 31.3200 -97.3300 251.000 457.0 131.932 3.410 -999.990 -999.990 1.319 ..P WKT 2011 02 19 02 04 55 31.3200 -97.3300 251.000 30.0 131.587 4.000 -999.990 -999.990 1.316 ..P WKT 2011 02 19 02 09 55 31.3200 -97.3300 251.000 122.0 126.723 3.150 -999.990 -999.990 1.267 ..P WKT 2011 02 19 02 14 55 31.3200 -97.3300 251.000 457.0 127.786 3.470 -999.990 -999.990 1.278 ..P WKT 2011 02 19 02 19 55 31.3200 -97.3300 251.000 30.0 123.263 3.770 -999.990 -999.990 1.233 ..P WKT 2011 02 19 02 24 55 31.3200 -97.3300 251.000 122.0 126.524 3.830 -999.990 -999.990 1.265 ..P WKT 2011 02 19 02 29 55 31.3200 -97.3300 251.000 457.0 119.297 4.180 -999.990 -999.990 1.193 ..P WKT 2011 02 19 02 39 55 31.3200 -97.3300 251.000 30.0 117.098 5.090 -999.990 -999.990 1.171 ..P WKT 2011 02 19 02 44 55 31.3200 -97.3300 251.000 122.0 123.643 4.760 -999.990 -999.990 1.236 ..P WKT 2011 02 19 02 49 55 31.3200 -97.3300 251.000 457.0 121.734 3.380 -999.990 -999.990 1.217 ..P WKT 2011 02 19 02 54 55 31.3200 -97.3300 251.000 30.0 129.120 3.780 -999.990 -999.990 1.291 ..P WKT 2011 02 19 02 59 55 31.3200 -97.3300 251.000 122.0 118.425 3.940 -999.990 -999.990 1.184 ..P WKT 2011 02 19 03 04 55 31.3200 -97.3300 251.000 457.0 121.755 3.030 -999.990 -999.990 1.218 ..P WKT 2011 02 19 03 14 55 31.3200 -97.3300 251.000 30.0 123.659 2.900 -999.990 -999.990 1.237 ..P WKT 2011 02 19 03 19 55 31.3200 -97.3300 251.000 122.0 114.131 2.930 -999.990 -999.990 1.141 ..P WKT 2011 02 19 03 24 55 31.3200 -97.3300 251.000 457.0 116.085 3.040 -999.990 -999.990 1.161 ..P WKT 2011 02 19 03 29 55 31.3200 -97.3300 251.000 30.0 116.350 2.890 -999.990 -999.990 1.163 ..P WKT 2011 02 19 03 34 55 31.3200 -97.3300 251.000 122.0 117.290 2.610 -999.990 -999.990 1.173 ..P WKT 2011 02 19 03 39 55 31.3200 -97.3300 251.000 457.0 109.120 3.020 -999.990 -999.990 1.091 ..P WKT 2011 02 19 03 49 55 31.3200 -97.3300 251.000 30.0 116.881 2.810 -999.990 -999.990 1.169 ..P WKT 2011 02 19 03 54 55 31.3200 -97.3300 251.000 122.0 117.290 3.300 -999.990 -999.990 1.173 ..P WKT 2011 02 19 03 59 55 31.3200 -97.3300 251.000 457.0 115.339 3.190 -999.990 -999.990 1.153 ..P WKT 2011 02 19 04 04 55 31.3200 -97.3300 251.000 30.0 120.468 3.650 -999.990 -999.990 1.205 ..P WKT 2011 02 19 04 09 55 31.3200 -97.3300 251.000 122.0 121.887 3.160 -999.990 -999.990 1.219 ..P WKT 2011 02 19 04 14 55 31.3200 -97.3300 251.000 457.0 116.567 4.120 -999.990 -999.990 1.166 ..P WKT 2011 02 19 04 24 55 31.3200 -97.3300 251.000 30.0 120.561 2.750 -999.990 -999.990 1.206 ..P WKT 2011 02 19 04 29 55 31.3200 -97.3300 251.000 122.0 120.440 3.690 -999.990 -999.990 1.204 ..P WKT 2011 02 19 04 34 55 31.3200 -97.3300 251.000 457.0 110.892 3.270 -999.990 -999.990 1.109 ..P WKT 2011 02 19 04 39 55 31.3200 -97.3300 251.000 30.0 121.208 4.030 -999.990 -999.990 1.212 ..P WKT 2011 02 19 04 44 55 31.3200 -97.3300 251.000 122.0 121.760 4.490 -999.990 -999.990 1.218 ..P WKT 2011 02 19 04 49 55 31.3200 -97.3300 251.000 457.0 112.553 3.980 -999.990 -999.990 1.126 ..P WKT 2011 02 19 05 04 55 31.3200 -97.3300 251.000 30.0 122.645 4.150 -999.990 -999.990 1.226 ..P WKT 2011 02 19 05 09 55 31.3200 -97.3300 251.000 122.0 115.642 6.000 -999.990 -999.990 1.156 ..P WKT 2011 02 19 05 14 55 31.3200 -97.3300 251.000 457.0 89.145 3.670 -999.990 -999.990 0.891 ..P WKT 2011 02 19 05 19 55 31.3200 -97.3300 251.000 30.0 114.755 4.200 -999.990 -999.990 1.148 ..P WKT 2011 02 19 05 24 55 31.3200 -97.3300 251.000 122.0 121.872 3.980 -999.990 -999.990 1.219 ..P WKT 2011 02 19 05 29 55 31.3200 -97.3300 251.000 457.0 92.532 3.540 -999.990 -999.990 0.925 ..P WKT 2011 02 19 05 39 55 31.3200 -97.3300 251.000 30.0 121.989 3.510 -999.990 -999.990 1.220 ..P WKT 2011 02 19 05 44 55 31.3200 -97.3300 251.000 122.0 122.828 3.360 -999.990 -999.990 1.228 ..P WKT 2011 02 19 05 49 55 31.3200 -97.3300 251.000 457.0 92.779 3.650 -999.990 -999.990 0.928 ..P WKT 2011 02 19 05 54 55 31.3200 -97.3300 251.000 30.0 116.448 3.330 -999.990 -999.990 1.164 ..P WKT 2011 02 19 05 59 55 31.3200 -97.3300 251.000 122.0 118.797 3.280 -999.990 -999.990 1.188 ..P WKT 2011 02 19 06 04 55 31.3200 -97.3300 251.000 457.0 91.617 3.230 -999.990 -999.990 0.916 ..P WKT 2011 02 19 06 14 55 31.3200 -97.3300 251.000 30.0 117.526 3.440 -999.990 -999.990 1.175 ..P WKT 2011 02 19 06 19 55 31.3200 -97.3300 251.000 122.0 112.232 3.120 -999.990 -999.990 1.122 ..P WKT 2011 02 19 06 24 55 31.3200 -97.3300 251.000 457.0 86.990 3.650 -999.990 -999.990 0.870 ..P WKT 2011 02 19 06 29 55 31.3200 -97.3300 251.000 30.0 111.707 4.030 -999.990 -999.990 1.117 ..P WKT 2011 02 19 06 34 55 31.3200 -97.3300 251.000 122.0 118.986 4.010 -999.990 -999.990 1.190 ..P WKT 2011 02 19 06 39 55 31.3200 -97.3300 251.000 457.0 84.207 4.760 -999.990 -999.990 0.842 ..P WKT 2011 02 19 06 49 55 31.3200 -97.3300 251.000 30.0 112.046 6.340 -999.990 -999.990 1.120 ..P WKT 2011 02 19 06 54 55 31.3200 -97.3300 251.000 122.0 127.907 4.790 -999.990 -999.990 1.279 ..P WKT 2011 02 19 06 59 55 31.3200 -97.3300 251.000 457.0 91.526 4.470 -999.990 -999.990 0.915 ..P WKT 2011 02 19 07 04 55 31.3200 -97.3300 251.000 30.0 129.313 4.650 -999.990 -999.990 1.293 ..P WKT 2011 02 19 07 09 55 31.3200 -97.3300 251.000 122.0 126.920 4.730 -999.990 -999.990 1.269 ..P WKT 2011 02 19 07 14 55 31.3200 -97.3300 251.000 457.0 97.756 4.810 -999.990 -999.990 0.978 ..P WKT 2011 02 19 07 24 55 31.3200 -97.3300 251.000 30.0 123.068 4.730 -999.990 -999.990 1.231 ..P WKT 2011 02 19 07 29 55 31.3200 -97.3300 251.000 122.0 119.650 4.270 -999.990 -999.990 1.197 ..P WKT 2011 02 19 07 34 55 31.3200 -97.3300 251.000 457.0 87.809 4.760 -999.990 -999.990 0.878 ..P WKT 2011 02 19 07 39 55 31.3200 -97.3300 251.000 30.0 117.834 6.370 -999.990 -999.990 1.178 ..P WKT 2011 02 19 07 44 55 31.3200 -97.3300 251.000 122.0 114.084 6.240 -999.990 -999.990 1.141 ..P WKT 2011 02 19 07 49 55 31.3200 -97.3300 251.000 457.0 90.953 4.030 -999.990 -999.990 0.910 ..P WKT 2011 02 19 07 59 55 31.3200 -97.3300 251.000 30.0 109.480 3.880 -999.990 -999.990 1.095 ..P WKT 2011 02 19 08 04 55 31.3200 -97.3300 251.000 122.0 113.705 5.180 -999.990 -999.990 1.137 ..P WKT 2011 02 19 08 09 55 31.3200 -97.3300 251.000 457.0 92.880 5.900 -999.990 -999.990 0.929 ..P WKT 2011 02 19 08 14 55 31.3200 -97.3300 251.000 30.0 117.140 5.290 -999.990 -999.990 1.171 ..P WKT 2011 02 19 08 19 55 31.3200 -97.3300 251.000 122.0 115.018 5.140 -999.990 -999.990 1.150 ..P WKT 2011 02 19 08 24 55 31.3200 -97.3300 251.000 457.0 94.873 3.300 -999.990 -999.990 0.949 ..P WKT 2011 02 19 08 34 55 31.3200 -97.3300 251.000 30.0 116.878 3.980 -999.990 -999.990 1.169 ..P WKT 2011 02 19 08 39 55 31.3200 -97.3300 251.000 122.0 115.639 8.590 -999.990 -999.990 1.156 ..P WKT 2011 02 19 08 44 55 31.3200 -97.3300 251.000 457.0 98.390 5.080 -999.990 -999.990 0.984 ..P WKT 2011 02 19 08 49 55 31.3200 -97.3300 251.000 30.0 108.493 4.290 -999.990 -999.990 1.085 ..P WKT 2011 02 19 08 54 55 31.3200 -97.3300 251.000 122.0 116.258 3.550 -999.990 -999.990 1.163 ..P WKT 2011 02 19 08 59 55 31.3200 -97.3300 251.000 457.0 93.353 3.820 -999.990 -999.990 0.934 ..P WKT 2011 02 19 09 09 55 31.3200 -97.3300 251.000 30.0 111.093 3.900 -999.990 -999.990 1.111 ..P WKT 2011 02 19 09 14 55 31.3200 -97.3300 251.000 122.0 113.570 3.350 -999.990 -999.990 1.136 ..P WKT 2011 02 19 09 19 55 31.3200 -97.3300 251.000 457.0 90.230 3.290 -999.990 -999.990 0.902 ..P WKT 2011 02 19 09 24 55 31.3200 -97.3300 251.000 30.0 107.695 3.560 -999.990 -999.990 1.077 ..P WKT 2011 02 19 09 29 55 31.3200 -97.3300 251.000 122.0 103.179 4.080 -999.990 -999.990 1.032 ..P WKT 2011 02 19 09 34 55 31.3200 -97.3300 251.000 457.0 84.848 3.220 -999.990 -999.990 0.848 ..P WKT 2011 02 19 09 44 55 31.3200 -97.3300 251.000 30.0 111.125 3.720 -999.990 -999.990 1.111 ..P WKT 2011 02 19 09 49 55 31.3200 -97.3300 251.000 122.0 112.790 3.570 -999.990 -999.990 1.128 ..P WKT 2011 02 19 09 54 55 31.3200 -97.3300 251.000 457.0 107.967 3.920 -999.990 -999.990 1.080 ..P WKT 2011 02 19 09 59 55 31.3200 -97.3300 251.000 30.0 110.796 3.460 -999.990 -999.990 1.108 ..P WKT 2011 02 19 10 04 55 31.3200 -97.3300 251.000 122.0 105.974 3.650 -999.990 -999.990 1.060 ..P WKT 2011 02 19 10 09 55 31.3200 -97.3300 251.000 457.0 106.808 4.310 -999.990 -999.990 1.068 ..P WKT 2011 02 19 10 19 55 31.3200 -97.3300 251.000 30.0 107.809 3.770 -999.990 -999.990 1.078 ..P WKT 2011 02 19 10 24 55 31.3200 -97.3300 251.000 122.0 111.632 3.790 -999.990 -999.990 1.116 ..P WKT 2011 02 19 10 29 55 31.3200 -97.3300 251.000 457.0 112.629 4.190 -999.990 -999.990 1.126 ..P WKT 2011 02 19 10 34 55 31.3200 -97.3300 251.000 30.0 111.966 3.630 -999.990 -999.990 1.120 ..P WKT 2011 02 19 10 39 55 31.3200 -97.3300 251.000 122.0 111.967 4.330 -999.990 -999.990 1.120 ..P WKT 2011 02 19 10 44 55 31.3200 -97.3300 251.000 457.0 115.786 4.550 -999.990 -999.990 1.158 ..P WKT 2011 02 19 10 54 55 31.3200 -97.3300 251.000 30.0 113.392 4.130 -999.990 -999.990 1.134 ..P WKT 2011 02 19 10 59 55 31.3200 -97.3300 251.000 122.0 115.479 3.980 -999.990 -999.990 1.155 ..P WKT 2011 02 19 11 04 55 31.3200 -97.3300 251.000 457.0 108.275 3.440 -999.990 -999.990 1.083 ..P WKT 2011 02 19 11 09 55 31.3200 -97.3300 251.000 30.0 114.010 2.890 -999.990 -999.990 1.140 ..P WKT 2011 02 19 11 14 55 31.3200 -97.3300 251.000 122.0 112.779 2.900 -999.990 -999.990 1.128 ..P WKT 2011 02 19 11 19 55 31.3200 -97.3300 251.000 457.0 111.879 2.780 -999.990 -999.990 1.119 ..P WKT 2011 02 19 11 29 55 31.3200 -97.3300 251.000 30.0 112.656 2.810 -999.990 -999.990 1.127 ..P WKT 2011 02 19 11 34 55 31.3200 -97.3300 251.000 122.0 114.000 3.270 -999.990 -999.990 1.140 ..P WKT 2011 02 19 11 39 55 31.3200 -97.3300 251.000 457.0 108.386 3.380 -999.990 -999.990 1.084 ..P WKT 2011 02 19 11 44 55 31.3200 -97.3300 251.000 30.0 110.061 3.530 -999.990 -999.990 1.101 ..P WKT 2011 02 19 11 49 55 31.3200 -97.3300 251.000 122.0 107.099 4.640 -999.990 -999.990 1.071 ..P WKT 2011 02 19 12 09 55 31.3200 -97.3300 251.000 457.0 107.898 4.290 -999.990 -999.990 1.079 ..P WKT 2011 02 19 12 10 25 31.3200 -97.3300 251.000 457.0 111.811 3.880 -999.990 -999.990 1.118 ..P WKT 2011 02 19 12 10 55 31.3200 -97.3300 251.000 457.0 107.775 4.090 -999.990 -999.990 1.078 ..P WKT 2011 02 19 12 11 25 31.3200 -97.3300 251.000 457.0 104.400 4.150 -999.990 -999.990 1.044 ..P WKT 2011 02 19 12 11 55 31.3200 -97.3300 251.000 457.0 103.676 4.050 -999.990 -999.990 1.037 ..P WKT 2011 02 19 12 12 25 31.3200 -97.3300 251.000 457.0 109.245 3.880 -999.990 -999.990 1.092 ..P WKT 2011 02 19 12 12 55 31.3200 -97.3300 251.000 457.0 113.158 4.120 -999.990 -999.990 1.132 ..P WKT 2011 02 19 12 13 25 31.3200 -97.3300 251.000 457.0 107.797 3.720 -999.990 -999.990 1.078 ..P WKT 2011 02 19 12 13 55 31.3200 -97.3300 251.000 457.0 107.072 4.150 -999.990 -999.990 1.071 ..P WKT 2011 02 19 12 14 25 31.3200 -97.3300 251.000 457.0 108.667 3.690 -999.990 -999.990 1.087 ..P WKT 2011 02 19 12 14 55 31.3200 -97.3300 251.000 457.0 107.611 3.670 -999.990 -999.990 1.076 ..P WKT 2011 02 19 12 19 55 31.3200 -97.3300 251.000 30.0 109.644 3.620 -999.990 -999.990 1.096 ..P WKT 2011 02 19 12 24 55 31.3200 -97.3300 251.000 122.0 106.043 3.450 -999.990 -999.990 1.060 ..P WKT 2011 02 19 12 29 55 31.3200 -97.3300 251.000 457.0 107.745 4.420 -999.990 -999.990 1.077 ..P WKT 2011 02 19 12 34 55 31.3200 -97.3300 251.000 30.0 107.126 3.660 -999.990 -999.990 1.071 ..P WKT 2011 02 19 12 39 55 31.3200 -97.3300 251.000 122.0 109.161 4.020 -999.990 -999.990 1.092 ..P WKT 2011 02 19 12 44 55 31.3200 -97.3300 251.000 457.0 103.235 2.820 -999.990 -999.990 1.032 ..P WKT 2011 02 19 12 54 55 31.3200 -97.3300 251.000 30.0 103.404 3.340 -999.990 -999.990 1.034 ..P WKT 2011 02 19 12 59 55 31.3200 -97.3300 251.000 122.0 108.010 4.190 -999.990 -999.990 1.080 ..P WKT 2011 02 19 13 04 55 31.3200 -97.3300 251.000 457.0 105.978 4.330 -999.990 -999.990 1.060 ..P WKT 2011 02 19 13 09 55 31.3200 -97.3300 251.000 30.0 110.421 3.880 -999.990 -999.990 1.104 ..P WKT 2011 02 19 13 14 55 31.3200 -97.3300 251.000 122.0 104.571 4.160 -999.990 -999.990 1.046 ..P WKT 2011 02 19 13 19 55 31.3200 -97.3300 251.000 457.0 106.191 4.330 -999.990 -999.990 1.062 ..P WKT 2011 02 19 13 29 55 31.3200 -97.3300 251.000 30.0 104.972 4.390 -999.990 -999.990 1.050 ..P WKT 2011 02 19 13 34 55 31.3200 -97.3300 251.000 122.0 105.620 4.310 -999.990 -999.990 1.056 ..P WKT 2011 02 19 13 39 55 31.3200 -97.3300 251.000 457.0 102.612 5.820 -999.990 -999.990 1.026 ..P WKT 2011 02 19 13 44 55 31.3200 -97.3300 251.000 30.0 107.914 4.670 -999.990 -999.990 1.079 ..P WKT 2011 02 19 13 49 55 31.3200 -97.3300 251.000 122.0 102.079 4.280 -999.990 -999.990 1.021 ..P WKT 2011 02 19 13 54 55 31.3200 -97.3300 251.000 457.0 101.729 3.550 -999.990 -999.990 1.017 ..P WKT 2011 02 19 14 04 55 31.3200 -97.3300 251.000 30.0 108.349 5.680 -999.990 -999.990 1.083 ..P WKT 2011 02 19 14 09 55 31.3200 -97.3300 251.000 122.0 108.667 4.310 -999.990 -999.990 1.087 ..P WKT 2011 02 19 14 14 55 31.3200 -97.3300 251.000 457.0 105.988 4.640 -999.990 -999.990 1.060 ..P WKT 2011 02 19 14 19 55 31.3200 -97.3300 251.000 30.0 113.296 4.870 -999.990 -999.990 1.133 ..P WKT 2011 02 19 14 24 55 31.3200 -97.3300 251.000 122.0 115.612 4.730 -999.990 -999.990 1.156 ..P WKT 2011 02 19 14 29 55 31.3200 -97.3300 251.000 457.0 108.103 5.600 -999.990 -999.990 1.081 ..P WKT 2011 02 19 14 39 55 31.3200 -97.3300 251.000 30.0 107.858 4.090 -999.990 -999.990 1.079 ..P WKT 2011 02 19 14 44 55 31.3200 -97.3300 251.000 122.0 107.794 4.690 -999.990 -999.990 1.078 ..P WKT 2011 02 19 14 49 55 31.3200 -97.3300 251.000 457.0 111.064 4.820 -999.990 -999.990 1.111 ..P WKT 2011 02 19 14 54 55 31.3200 -97.3300 251.000 30.0 108.334 4.730 -999.990 -999.990 1.083 ..P WKT 2011 02 19 14 59 55 31.3200 -97.3300 251.000 122.0 114.606 3.800 -999.990 -999.990 1.146 ..P WKT 2011 02 19 15 04 55 31.3200 -97.3300 251.000 457.0 105.539 3.790 -999.990 -999.990 1.055 ..P WKT 2011 02 19 15 14 55 31.3200 -97.3300 251.000 30.0 109.724 3.610 -999.990 -999.990 1.097 ..P WKT 2011 02 19 15 19 55 31.3200 -97.3300 251.000 122.0 108.302 4.900 -999.990 -999.990 1.083 ..P WKT 2011 02 19 15 24 55 31.3200 -97.3300 251.000 457.0 100.205 4.020 -999.990 -999.990 1.002 ..P WKT 2011 02 19 15 29 55 31.3200 -97.3300 251.000 30.0 109.797 4.400 -999.990 -999.990 1.098 ..P WKT 2011 02 19 15 34 55 31.3200 -97.3300 251.000 122.0 112.715 4.920 -999.990 -999.990 1.127 ..P WKT 2011 02 19 15 39 55 31.3200 -97.3300 251.000 457.0 112.963 3.630 -999.990 -999.990 1.130 ..P WKT 2011 02 19 15 49 55 31.3200 -97.3300 251.000 30.0 113.123 3.520 -999.990 -999.990 1.131 ..P WKT 2011 02 19 15 54 55 31.3200 -97.3300 251.000 122.0 113.705 4.180 -999.990 -999.990 1.137 ..P WKT 2011 02 19 15 59 55 31.3200 -97.3300 251.000 457.0 104.260 4.190 -999.990 -999.990 1.043 ..P WKT 2011 02 19 16 04 55 31.3200 -97.3300 251.000 30.0 109.186 5.700 -999.990 -999.990 1.092 ..P WKT 2011 02 19 16 09 55 31.3200 -97.3300 251.000 122.0 106.423 4.220 -999.990 -999.990 1.064 ..P WKT 2011 02 19 16 14 55 31.3200 -97.3300 251.000 457.0 110.349 3.980 -999.990 -999.990 1.103 ..P WKT 2011 02 19 16 24 55 31.3200 -97.3300 251.000 30.0 111.034 3.870 -999.990 -999.990 1.110 ..P WKT 2011 02 19 16 29 55 31.3200 -97.3300 251.000 122.0 105.785 4.310 -999.990 -999.990 1.058 ..P WKT 2011 02 19 16 34 55 31.3200 -97.3300 251.000 457.0 105.888 4.900 -999.990 -999.990 1.059 ..P WKT 2011 02 19 16 39 55 31.3200 -97.3300 251.000 30.0 112.351 5.470 -999.990 -999.990 1.124 ..P WKT 2011 02 19 16 44 55 31.3200 -97.3300 251.000 122.0 117.478 5.000 -999.990 -999.990 1.175 ..P WKT 2011 02 19 16 49 55 31.3200 -97.3300 251.000 457.0 108.039 4.400 -999.990 -999.990 1.080 ..P WKT 2011 02 19 17 04 55 31.3200 -97.3300 251.000 30.0 114.107 4.770 -999.990 -999.990 1.141 ..P WKT 2011 02 19 17 09 55 31.3200 -97.3300 251.000 122.0 118.432 6.360 -999.990 -999.990 1.184 ..P WKT 2011 02 19 17 14 55 31.3200 -97.3300 251.000 457.0 109.851 5.740 -999.990 -999.990 1.099 ..P WKT 2011 02 19 17 19 55 31.3200 -97.3300 251.000 30.0 114.679 5.020 -999.990 -999.990 1.147 ..P WKT 2011 02 19 17 24 55 31.3200 -97.3300 251.000 122.0 112.969 4.730 -999.990 -999.990 1.130 ..P WKT 2011 02 19 17 29 55 31.3200 -97.3300 251.000 457.0 109.247 4.870 -999.990 -999.990 1.092 ..P WKT 2011 02 19 17 39 55 31.3200 -97.3300 251.000 30.0 111.427 5.390 -999.990 -999.990 1.114 ..P WKT 2011 02 19 17 44 55 31.3200 -97.3300 251.000 122.0 113.976 5.430 -999.990 -999.990 1.140 ..P WKT 2011 02 19 17 49 55 31.3200 -97.3300 251.000 457.0 113.003 5.990 -999.990 -999.990 1.130 ..P WKT 2011 02 19 17 54 55 31.3200 -97.3300 251.000 30.0 114.043 5.970 -999.990 -999.990 1.140 ..P WKT 2011 02 19 17 59 55 31.3200 -97.3300 251.000 122.0 114.244 5.050 -999.990 -999.990 1.142 ..P WKT 2011 02 19 18 04 55 31.3200 -97.3300 251.000 457.0 109.239 5.220 -999.990 -999.990 1.092 ..P WKT 2011 02 19 18 14 55 31.3200 -97.3300 251.000 30.0 109.040 5.850 -999.990 -999.990 1.090 ..P WKT 2011 02 19 18 19 55 31.3200 -97.3300 251.000 122.0 113.849 5.410 -999.990 -999.990 1.138 ..P WKT 2011 02 19 18 24 55 31.3200 -97.3300 251.000 457.0 115.971 5.050 -999.990 -999.990 1.160 ..P WKT 2011 02 19 18 29 55 31.3200 -97.3300 251.000 30.0 115.573 5.330 -999.990 -999.990 1.156 ..P WKT 2011 02 19 18 34 55 31.3200 -97.3300 251.000 122.0 116.182 4.480 -999.990 -999.990 1.162 ..P WKT 2011 02 19 18 39 55 31.3200 -97.3300 251.000 457.0 118.980 4.530 -999.990 -999.990 1.190 ..P WKT 2011 02 19 18 49 55 31.3200 -97.3300 251.000 30.0 109.025 4.480 -999.990 -999.990 1.090 ..P WKT 2011 02 19 18 54 55 31.3200 -97.3300 251.000 122.0 115.283 4.410 -999.990 -999.990 1.153 ..P WKT 2011 02 19 18 59 55 31.3200 -97.3300 251.000 457.0 113.802 4.190 -999.990 -999.990 1.138 ..P WKT 2011 02 19 19 04 55 31.3200 -97.3300 251.000 30.0 115.014 4.430 -999.990 -999.990 1.150 ..P WKT 2011 02 19 19 09 55 31.3200 -97.3300 251.000 122.0 116.899 5.510 -999.990 -999.990 1.169 ..P WKT 2011 02 19 19 14 55 31.3200 -97.3300 251.000 457.0 122.828 4.240 -999.990 -999.990 1.228 ..P WKT 2011 02 19 19 24 55 31.3200 -97.3300 251.000 30.0 112.693 3.930 -999.990 -999.990 1.127 ..P WKT 2011 02 19 19 29 55 31.3200 -97.3300 251.000 122.0 114.820 5.100 -999.990 -999.990 1.148 ..P WKT 2011 02 19 19 34 55 31.3200 -97.3300 251.000 457.0 117.959 4.130 -999.990 -999.990 1.180 ..P WKT 2011 02 19 19 39 55 31.3200 -97.3300 251.000 30.0 117.055 4.390 -999.990 -999.990 1.171 ..P WKT 2011 02 19 19 44 55 31.3200 -97.3300 251.000 122.0 115.475 4.550 -999.990 -999.990 1.155 ..P WKT 2011 02 19 19 49 55 31.3200 -97.3300 251.000 457.0 116.593 5.530 -999.990 -999.990 1.166 ..P WKT 2011 02 19 19 59 55 31.3200 -97.3300 251.000 30.0 116.612 4.060 -999.990 -999.990 1.166 ..P WKT 2011 02 19 20 04 55 31.3200 -97.3300 251.000 122.0 120.575 4.300 -999.990 -999.990 1.206 ..P WKT 2011 02 19 20 09 55 31.3200 -97.3300 251.000 457.0 115.425 4.320 -999.990 -999.990 1.154 ..P WKT 2011 02 19 20 14 55 31.3200 -97.3300 251.000 30.0 114.326 4.220 -999.990 -999.990 1.143 ..P WKT 2011 02 19 20 19 55 31.3200 -97.3300 251.000 122.0 116.941 4.220 -999.990 -999.990 1.169 ..P WKT 2011 02 19 20 24 55 31.3200 -97.3300 251.000 457.0 109.760 4.080 -999.990 -999.990 1.098 ..P WKT 2011 02 19 20 34 55 31.3200 -97.3300 251.000 30.0 117.283 4.260 -999.990 -999.990 1.173 ..P WKT 2011 02 19 20 39 55 31.3200 -97.3300 251.000 122.0 117.462 4.250 -999.990 -999.990 1.175 ..P WKT 2011 02 19 20 44 55 31.3200 -97.3300 251.000 457.0 122.881 4.800 -999.990 -999.990 1.229 ..P WKT 2011 02 19 20 49 55 31.3200 -97.3300 251.000 30.0 118.834 4.520 -999.990 -999.990 1.188 ..P WKT 2011 02 19 20 54 55 31.3200 -97.3300 251.000 122.0 118.845 5.180 -999.990 -999.990 1.188 ..P WKT 2011 02 19 20 59 55 31.3200 -97.3300 251.000 457.0 120.546 5.680 -999.990 -999.990 1.205 ..P WKT 2011 02 19 21 09 55 31.3200 -97.3300 251.000 30.0 129.777 5.650 -999.990 -999.990 1.298 ..P WKT 2011 02 19 21 14 55 31.3200 -97.3300 251.000 122.0 120.215 4.480 -999.990 -999.990 1.202 ..P WKT 2011 02 19 21 19 55 31.3200 -97.3300 251.000 457.0 119.791 4.890 -999.990 -999.990 1.198 ..P WKT 2011 02 19 21 24 55 31.3200 -97.3300 251.000 30.0 119.535 5.030 -999.990 -999.990 1.195 ..P WKT 2011 02 19 21 29 55 31.3200 -97.3300 251.000 122.0 120.972 4.710 -999.990 -999.990 1.210 ..P WKT 2011 02 19 21 34 55 31.3200 -97.3300 251.000 457.0 129.523 4.850 -999.990 -999.990 1.295 ..P WKT 2011 02 19 21 44 55 31.3200 -97.3300 251.000 30.0 120.787 4.840 -999.990 -999.990 1.208 ..P WKT 2011 02 19 21 49 55 31.3200 -97.3300 251.000 122.0 123.824 5.650 -999.990 -999.990 1.238 ..P WKT 2011 02 19 21 54 55 31.3200 -97.3300 251.000 457.0 124.488 5.450 -999.990 -999.990 1.245 ..P WKT 2011 02 19 21 59 55 31.3200 -97.3300 251.000 30.0 121.933 4.810 -999.990 -999.990 1.219 ..P WKT 2011 02 19 22 04 55 31.3200 -97.3300 251.000 122.0 130.058 5.070 -999.990 -999.990 1.301 ..P WKT 2011 02 19 22 09 55 31.3200 -97.3300 251.000 457.0 127.841 5.660 -999.990 -999.990 1.278 ..P WKT 2011 02 19 22 19 55 31.3200 -97.3300 251.000 30.0 125.539 5.480 -999.990 -999.990 1.255 ..P WKT 2011 02 19 22 24 55 31.3200 -97.3300 251.000 122.0 127.320 6.320 -999.990 -999.990 1.273 ..P WKT 2011 02 19 22 29 55 31.3200 -97.3300 251.000 457.0 124.011 5.530 -999.990 -999.990 1.240 ..P WKT 2011 02 19 22 34 55 31.3200 -97.3300 251.000 30.0 120.359 5.980 -999.990 -999.990 1.204 ..P WKT 2011 02 19 22 39 55 31.3200 -97.3300 251.000 122.0 113.142 6.530 -999.990 -999.990 1.131 ..P WKT 2011 02 19 22 44 55 31.3200 -97.3300 251.000 457.0 117.469 5.880 -999.990 -999.990 1.175 ..P WKT 2011 02 19 22 54 55 31.3200 -97.3300 251.000 30.0 120.645 5.670 -999.990 -999.990 1.206 ..P WKT 2011 02 19 22 59 55 31.3200 -97.3300 251.000 122.0 123.229 6.220 -999.990 -999.990 1.232 ..P WKT 2011 02 19 23 04 55 31.3200 -97.3300 251.000 457.0 116.296 5.590 -999.990 -999.990 1.163 ..P WKT 2011 02 19 23 09 55 31.3200 -97.3300 251.000 30.0 115.820 6.630 -999.990 -999.990 1.158 ..P WKT 2011 02 19 23 14 55 31.3200 -97.3300 251.000 122.0 113.303 5.790 -999.990 -999.990 1.133 ..P WKT 2011 02 19 23 19 55 31.3200 -97.3300 251.000 457.0 114.187 5.370 -999.990 -999.990 1.142 ..P WKT 2011 02 19 23 29 55 31.3200 -97.3300 251.000 30.0 111.763 5.180 -999.990 -999.990 1.118 ..P WKT 2011 02 19 23 34 55 31.3200 -97.3300 251.000 122.0 111.516 5.070 -999.990 -999.990 1.115 ..P WKT 2011 02 19 23 39 55 31.3200 -97.3300 251.000 457.0 115.696 5.570 -999.990 -999.990 1.157 ..P WKT 2011 02 19 23 44 55 31.3200 -97.3300 251.000 30.0 110.002 5.040 -999.990 -999.990 1.100 ..P WKT 2011 02 19 23 49 55 31.3200 -97.3300 251.000 122.0 113.161 4.940 -999.990 -999.990 1.132 ..P WKT 2011 02 20 00 09 55 31.3200 -97.3300 251.000 457.0 110.738 4.950 -999.990 -999.990 1.107 ..P WKT 2011 02 20 00 10 25 31.3200 -97.3300 251.000 457.0 108.084 4.730 -999.990 -999.990 1.081 ..P WKT 2011 02 20 00 10 55 31.3200 -97.3300 251.000 457.0 106.791 4.650 -999.990 -999.990 1.068 ..P WKT 2011 02 20 00 11 25 31.3200 -97.3300 251.000 457.0 110.268 4.950 -999.990 -999.990 1.103 ..P WKT 2011 02 20 00 11 55 31.3200 -97.3300 251.000 457.0 110.678 4.800 -999.990 -999.990 1.107 ..P WKT 2011 02 20 00 12 25 31.3200 -97.3300 251.000 457.0 113.473 5.760 -999.990 -999.990 1.135 ..P WKT 2011 02 20 00 12 55 31.3200 -97.3300 251.000 457.0 104.005 5.250 -999.990 -999.990 1.040 ..P WKT 2011 02 20 00 13 25 31.3200 -97.3300 251.000 457.0 109.185 5.000 -999.990 -999.990 1.092 ..P WKT 2011 02 20 00 13 55 31.3200 -97.3300 251.000 457.0 109.255 4.800 -999.990 -999.990 1.093 ..P WKT 2011 02 20 00 14 25 31.3200 -97.3300 251.000 457.0 114.776 4.680 -999.990 -999.990 1.148 ..P WKT 2011 02 20 00 14 55 31.3200 -97.3300 251.000 457.0 108.373 4.830 -999.990 -999.990 1.084 ..P WKT 2011 02 20 00 19 55 31.3200 -97.3300 251.000 30.0 103.965 5.220 -999.990 -999.990 1.040 ..P WKT 2011 02 20 00 24 55 31.3200 -97.3300 251.000 122.0 119.652 5.360 -999.990 -999.990 1.197 ..P WKT 2011 02 20 00 29 55 31.3200 -97.3300 251.000 457.0 103.665 5.420 -999.990 -999.990 1.037 ..P WKT 2011 02 20 00 34 55 31.3200 -97.3300 251.000 30.0 119.349 7.420 -999.990 -999.990 1.193 ..P WKT 2011 02 20 00 39 55 31.3200 -97.3300 251.000 122.0 115.623 4.790 -999.990 -999.990 1.156 ..P WKT 2011 02 20 00 44 55 31.3200 -97.3300 251.000 457.0 112.408 5.120 -999.990 -999.990 1.124 ..P WKT 2011 02 20 00 54 55 31.3200 -97.3300 251.000 30.0 112.938 4.670 -999.990 -999.990 1.129 ..P WKT 2011 02 20 00 59 55 31.3200 -97.3300 251.000 122.0 116.684 4.980 -999.990 -999.990 1.167 ..P WKT 2011 02 20 01 04 55 31.3200 -97.3300 251.000 457.0 113.790 5.130 -999.990 -999.990 1.138 ..P WKT 2011 02 20 01 09 55 31.3200 -97.3300 251.000 30.0 114.642 5.490 -999.990 -999.990 1.146 ..P WKT 2011 02 20 01 14 55 31.3200 -97.3300 251.000 122.0 113.281 4.870 -999.990 -999.990 1.133 ..P WKT 2011 02 20 01 19 55 31.3200 -97.3300 251.000 457.0 119.919 4.690 -999.990 -999.990 1.199 ..P WKT 2011 02 20 01 29 55 31.3200 -97.3300 251.000 30.0 116.151 4.980 -999.990 -999.990 1.162 ..P WKT 2011 02 20 01 34 55 31.3200 -97.3300 251.000 122.0 113.064 4.670 -999.990 -999.990 1.131 ..P WKT 2011 02 20 01 39 55 31.3200 -97.3300 251.000 457.0 112.360 5.750 -999.990 -999.990 1.124 ..P WKT 2011 02 20 01 44 55 31.3200 -97.3300 251.000 30.0 119.313 4.860 -999.990 -999.990 1.193 ..P WKT 2011 02 20 01 49 55 31.3200 -97.3300 251.000 122.0 111.462 5.190 -999.990 -999.990 1.115 ..P WKT 2011 02 20 01 54 55 31.3200 -97.3300 251.000 457.0 119.264 5.190 -999.990 -999.990 1.193 ..P WKT 2011 02 20 02 04 55 31.3200 -97.3300 251.000 30.0 111.561 5.180 -999.990 -999.990 1.116 ..P WKT 2011 02 20 02 09 55 31.3200 -97.3300 251.000 122.0 108.646 5.030 -999.990 -999.990 1.086 ..P WKT 2011 02 20 02 14 55 31.3200 -97.3300 251.000 457.0 113.215 5.280 -999.990 -999.990 1.132 ..P WKT 2011 02 20 02 19 55 31.3200 -97.3300 251.000 30.0 114.041 5.350 -999.990 -999.990 1.140 ..P WKT 2011 02 20 02 24 55 31.3200 -97.3300 251.000 122.0 111.127 5.520 -999.990 -999.990 1.111 ..P WKT 2011 02 20 02 29 55 31.3200 -97.3300 251.000 457.0 110.933 6.190 -999.990 -999.990 1.109 ..P WKT 2011 02 20 02 39 55 31.3200 -97.3300 251.000 30.0 112.610 5.580 -999.990 -999.990 1.126 ..P WKT 2011 02 20 02 44 55 31.3200 -97.3300 251.000 122.0 112.612 5.040 -999.990 -999.990 1.126 ..P WKT 2011 02 20 02 49 55 31.3200 -97.3300 251.000 457.0 104.280 5.220 -999.990 -999.990 1.043 ..P WKT 2011 02 20 02 54 55 31.3200 -97.3300 251.000 30.0 109.893 4.900 -999.990 -999.990 1.099 ..P WKT 2011 02 20 02 59 55 31.3200 -97.3300 251.000 122.0 121.964 5.480 -999.990 -999.990 1.220 ..P WKT 2011 02 20 03 04 55 31.3200 -97.3300 251.000 457.0 105.814 5.090 -999.990 -999.990 1.058 ..P WKT 2011 02 20 03 14 55 31.3200 -97.3300 251.000 30.0 118.176 4.480 -999.990 -999.990 1.182 ..P WKT 2011 02 20 03 19 55 31.3200 -97.3300 251.000 122.0 115.408 4.680 -999.990 -999.990 1.154 ..P WKT 2011 02 20 03 24 55 31.3200 -97.3300 251.000 457.0 108.562 4.650 -999.990 -999.990 1.086 ..P WKT 2011 02 20 03 29 55 31.3200 -97.3300 251.000 30.0 115.992 4.870 -999.990 -999.990 1.160 ..P WKT 2011 02 20 03 34 55 31.3200 -97.3300 251.000 122.0 117.643 4.810 -999.990 -999.990 1.176 ..P WKT 2011 02 20 03 39 55 31.3200 -97.3300 251.000 457.0 115.216 4.330 -999.990 -999.990 1.152 ..P WKT 2011 02 20 03 49 55 31.3200 -97.3300 251.000 30.0 114.780 4.620 -999.990 -999.990 1.148 ..P WKT 2011 02 20 03 54 55 31.3200 -97.3300 251.000 122.0 116.431 4.370 -999.990 -999.990 1.164 ..P WKT 2011 02 20 03 59 55 31.3200 -97.3300 251.000 457.0 111.286 5.050 -999.990 -999.990 1.113 ..P WKT 2011 02 20 04 04 55 31.3200 -97.3300 251.000 30.0 126.868 4.960 -999.990 -999.990 1.269 ..P WKT 2011 02 20 04 09 55 31.3200 -97.3300 251.000 122.0 117.306 4.860 -999.990 -999.990 1.173 ..P WKT 2011 02 20 04 14 55 31.3200 -97.3300 251.000 457.0 116.238 6.640 -999.990 -999.990 1.162 ..P WKT 2011 02 20 04 24 55 31.3200 -97.3300 251.000 30.0 114.904 6.340 -999.990 -999.990 1.149 ..P WKT 2011 02 20 04 29 55 31.3200 -97.3300 251.000 122.0 111.581 5.070 -999.990 -999.990 1.116 ..P WKT 2011 02 20 04 34 55 31.3200 -97.3300 251.000 457.0 119.806 5.310 -999.990 -999.990 1.198 ..P WKT 2011 02 20 04 39 55 31.3200 -97.3300 251.000 30.0 109.010 5.770 -999.990 -999.990 1.090 ..P WKT 2011 02 20 04 44 55 31.3200 -97.3300 251.000 122.0 115.197 6.100 -999.990 -999.990 1.152 ..P WKT 2011 02 20 04 49 55 31.3200 -97.3300 251.000 457.0 114.931 6.590 -999.990 -999.990 1.149 ..P WKT 2011 02 20 05 04 55 31.3200 -97.3300 251.000 30.0 113.010 5.920 -999.990 -999.990 1.130 ..P WKT 2011 02 20 05 09 55 31.3200 -97.3300 251.000 122.0 118.211 6.260 -999.990 -999.990 1.182 ..P WKT 2011 02 20 05 14 55 31.3200 -97.3300 251.000 457.0 120.524 5.440 -999.990 -999.990 1.205 ..P WKT 2011 02 20 05 19 55 31.3200 -97.3300 251.000 30.0 112.143 5.650 -999.990 -999.990 1.121 ..P WKT 2011 02 20 05 24 55 31.3200 -97.3300 251.000 122.0 118.869 4.860 -999.990 -999.990 1.189 ..P WKT 2011 02 20 05 29 55 31.3200 -97.3300 251.000 457.0 124.917 4.880 -999.990 -999.990 1.249 ..P WKT 2011 02 20 05 39 55 31.3200 -97.3300 251.000 30.0 122.840 4.790 -999.990 -999.990 1.228 ..P WKT 2011 02 20 05 44 55 31.3200 -97.3300 251.000 122.0 121.677 4.640 -999.990 -999.990 1.217 ..P WKT 2011 02 20 05 49 55 31.3200 -97.3300 251.000 457.0 119.495 4.790 -999.990 -999.990 1.195 ..P WKT 2011 02 20 05 54 55 31.3200 -97.3300 251.000 30.0 120.877 4.520 -999.990 -999.990 1.209 ..P WKT 2011 02 20 05 59 55 31.3200 -97.3300 251.000 122.0 126.331 4.510 -999.990 -999.990 1.263 ..P WKT 2011 02 20 06 04 55 31.3200 -97.3300 251.000 457.0 125.677 4.510 -999.990 -999.990 1.257 ..P WKT 2011 02 20 06 14 55 31.3200 -97.3300 251.000 30.0 123.858 4.580 -999.990 -999.990 1.239 ..P WKT 2011 02 20 06 19 55 31.3200 -97.3300 251.000 122.0 125.749 4.460 -999.990 -999.990 1.257 ..P WKT 2011 02 20 06 24 55 31.3200 -97.3300 251.000 457.0 122.889 4.680 -999.990 -999.990 1.229 ..P WKT 2011 02 20 06 29 55 31.3200 -97.3300 251.000 30.0 118.164 4.980 -999.990 -999.990 1.182 ..P WKT 2011 02 20 06 34 55 31.3200 -97.3300 251.000 122.0 116.322 5.050 -999.990 -999.990 1.163 ..P WKT 2011 02 20 06 39 55 31.3200 -97.3300 251.000 457.0 111.258 4.430 -999.990 -999.990 1.113 ..P WKT 2011 02 20 06 49 55 31.3200 -97.3300 251.000 30.0 121.775 4.370 -999.990 -999.990 1.218 ..P WKT 2011 02 20 06 54 55 31.3200 -97.3300 251.000 122.0 115.476 4.440 -999.990 -999.990 1.155 ..P WKT 2011 02 20 06 59 55 31.3200 -97.3300 251.000 457.0 118.335 5.420 -999.990 -999.990 1.183 ..P WKT 2011 02 20 07 04 55 31.3200 -97.3300 251.000 30.0 118.480 4.440 -999.990 -999.990 1.185 ..P WKT 2011 02 20 07 09 55 31.3200 -97.3300 251.000 122.0 122.018 5.120 -999.990 -999.990 1.220 ..P WKT 2011 02 20 07 14 55 31.3200 -97.3300 251.000 457.0 125.554 4.560 -999.990 -999.990 1.256 ..P WKT 2011 02 20 07 24 55 31.3200 -97.3300 251.000 30.0 112.863 4.290 -999.990 -999.990 1.129 ..P WKT 2011 02 20 07 29 55 31.3200 -97.3300 251.000 122.0 111.216 4.130 -999.990 -999.990 1.112 ..P WKT 2011 02 20 07 34 55 31.3200 -97.3300 251.000 457.0 114.656 4.590 -999.990 -999.990 1.147 ..P WKT 2011 02 20 07 39 55 31.3200 -97.3300 251.000 30.0 122.164 4.360 -999.990 -999.990 1.222 ..P WKT 2011 02 20 07 44 55 31.3200 -97.3300 251.000 122.0 113.398 4.080 -999.990 -999.990 1.134 ..P WKT 2011 02 20 07 49 55 31.3200 -97.3300 251.000 457.0 110.057 4.210 -999.990 -999.990 1.101 ..P WKT 2011 02 20 07 59 55 31.3200 -97.3300 251.000 30.0 120.517 4.400 -999.990 -999.990 1.205 ..P WKT 2011 02 20 08 04 55 31.3200 -97.3300 251.000 122.0 113.304 4.380 -999.990 -999.990 1.133 ..P WKT 2011 02 20 08 09 55 31.3200 -97.3300 251.000 457.0 117.274 4.440 -999.990 -999.990 1.173 ..P WKT 2011 02 20 08 14 55 31.3200 -97.3300 251.000 30.0 118.194 4.100 -999.990 -999.990 1.182 ..P WKT 2011 02 20 08 19 55 31.3200 -97.3300 251.000 122.0 117.420 4.050 -999.990 -999.990 1.174 ..P WKT 2011 02 20 08 24 55 31.3200 -97.3300 251.000 457.0 112.241 4.450 -999.990 -999.990 1.122 ..P WKT 2011 02 20 08 34 55 31.3200 -97.3300 251.000 30.0 116.139 4.310 -999.990 -999.990 1.161 ..P WKT 2011 02 20 08 39 55 31.3200 -97.3300 251.000 122.0 118.946 4.800 -999.990 -999.990 1.189 ..P WKT 2011 02 20 08 44 55 31.3200 -97.3300 251.000 457.0 110.405 4.180 -999.990 -999.990 1.104 ..P WKT 2011 02 20 08 49 55 31.3200 -97.3300 251.000 30.0 114.906 4.110 -999.990 -999.990 1.149 ..P WKT 2011 02 20 08 54 55 31.3200 -97.3300 251.000 122.0 120.762 4.570 -999.990 -999.990 1.208 ..P WKT 2011 02 20 08 59 55 31.3200 -97.3300 251.000 457.0 119.673 4.330 -999.990 -999.990 1.197 ..P WKT 2011 02 20 09 09 55 31.3200 -97.3300 251.000 30.0 113.625 4.400 -999.990 -999.990 1.136 ..P WKT 2011 02 20 09 14 55 31.3200 -97.3300 251.000 122.0 120.690 4.540 -999.990 -999.990 1.207 ..P WKT 2011 02 20 09 19 55 31.3200 -97.3300 251.000 457.0 116.239 4.400 -999.990 -999.990 1.162 ..P WKT 2011 02 20 09 24 55 31.3200 -97.3300 251.000 30.0 119.747 4.250 -999.990 -999.990 1.197 ..P WKT 2011 02 20 09 29 55 31.3200 -97.3300 251.000 122.0 115.296 4.130 -999.990 -999.990 1.153 ..P WKT 2011 02 20 09 34 55 31.3200 -97.3300 251.000 457.0 112.540 5.300 -999.990 -999.990 1.125 ..P WKT 2011 02 20 09 44 55 31.3200 -97.3300 251.000 30.0 117.160 4.080 -999.990 -999.990 1.172 ..P WKT 2011 02 20 09 49 55 31.3200 -97.3300 251.000 122.0 111.671 4.060 -999.990 -999.990 1.117 ..P WKT 2011 02 20 09 54 55 31.3200 -97.3300 251.000 457.0 109.568 4.330 -999.990 -999.990 1.096 ..P WKT 2011 02 20 09 59 55 31.3200 -97.3300 251.000 30.0 109.158 4.220 -999.990 -999.990 1.092 ..P WKT 2011 02 20 10 04 55 31.3200 -97.3300 251.000 122.0 115.179 5.530 -999.990 -999.990 1.152 ..P WKT 2011 02 20 10 09 55 31.3200 -97.3300 251.000 457.0 114.092 4.090 -999.990 -999.990 1.141 ..P WKT 2011 02 20 10 19 55 31.3200 -97.3300 251.000 30.0 114.020 3.950 -999.990 -999.990 1.140 ..P WKT 2011 02 20 10 24 55 31.3200 -97.3300 251.000 122.0 107.422 3.990 -999.990 -999.990 1.074 ..P WKT 2011 02 20 10 29 55 31.3200 -97.3300 251.000 457.0 109.283 4.460 -999.990 -999.990 1.093 ..P WKT 2011 02 20 10 34 55 31.3200 -97.3300 251.000 30.0 114.867 4.470 -999.990 -999.990 1.149 ..P WKT 2011 02 20 10 39 55 31.3200 -97.3300 251.000 122.0 115.545 4.070 -999.990 -999.990 1.155 ..P WKT 2011 02 20 10 44 55 31.3200 -97.3300 251.000 457.0 113.685 4.140 -999.990 -999.990 1.137 ..P WKT 2011 02 20 10 54 55 31.3200 -97.3300 251.000 30.0 110.182 5.410 -999.990 -999.990 1.102 ..P WKT 2011 02 20 10 59 55 31.3200 -97.3300 251.000 122.0 113.276 4.040 -999.990 -999.990 1.133 ..P WKT 2011 02 20 11 04 55 31.3200 -97.3300 251.000 457.0 114.001 4.450 -999.990 -999.990 1.140 ..P WKT 2011 02 20 11 09 55 31.3200 -97.3300 251.000 30.0 109.314 4.070 -999.990 -999.990 1.093 ..P WKT 2011 02 20 11 14 55 31.3200 -97.3300 251.000 122.0 115.114 4.070 -999.990 -999.990 1.151 ..P WKT 2011 02 20 11 19 55 31.3200 -97.3300 251.000 457.0 117.530 4.840 -999.990 -999.990 1.175 ..P WKT 2011 02 20 11 29 55 31.3200 -97.3300 251.000 30.0 110.351 3.880 -999.990 -999.990 1.104 ..P WKT 2011 02 20 11 34 55 31.3200 -97.3300 251.000 122.0 109.548 4.340 -999.990 -999.990 1.095 ..P WKT 2011 02 20 11 39 55 31.3200 -97.3300 251.000 457.0 119.904 4.650 -999.990 -999.990 1.199 ..P WKT 2011 02 20 11 44 55 31.3200 -97.3300 251.000 30.0 110.310 6.550 -999.990 -999.990 1.103 ..P WKT 2011 02 20 11 49 55 31.3200 -97.3300 251.000 122.0 106.127 4.590 -999.990 -999.990 1.061 ..P WKT 2011 02 20 12 09 55 31.3200 -97.3300 251.000 457.0 104.537 5.130 -999.990 -999.990 1.045 ..P WKT 2011 02 20 12 10 25 31.3200 -97.3300 251.000 457.0 103.231 5.300 -999.990 -999.990 1.032 ..P WKT 2011 02 20 12 10 55 31.3200 -97.3300 251.000 457.0 107.334 5.540 -999.990 -999.990 1.073 ..P WKT 2011 02 20 12 11 25 31.3200 -97.3300 251.000 457.0 108.056 5.180 -999.990 -999.990 1.081 ..P WKT 2011 02 20 12 11 55 31.3200 -97.3300 251.000 457.0 109.793 5.050 -999.990 -999.990 1.098 ..P WKT 2011 02 20 12 12 25 31.3200 -97.3300 251.000 457.0 112.882 5.030 -999.990 -999.990 1.129 ..P WKT 2011 02 20 12 12 55 31.3200 -97.3300 251.000 457.0 108.195 5.740 -999.990 -999.990 1.082 ..P WKT 2011 02 20 12 13 25 31.3200 -97.3300 251.000 457.0 108.579 5.920 -999.990 -999.990 1.086 ..P WKT 2011 02 20 12 13 55 31.3200 -97.3300 251.000 457.0 109.639 4.890 -999.990 -999.990 1.096 ..P WKT 2011 02 20 12 14 25 31.3200 -97.3300 251.000 457.0 111.714 4.940 -999.990 -999.990 1.117 ..P WKT 2011 02 20 12 14 55 31.3200 -97.3300 251.000 457.0 111.085 5.450 -999.990 -999.990 1.111 ..P WKT 2011 02 20 12 19 55 31.3200 -97.3300 251.000 30.0 112.222 4.630 -999.990 -999.990 1.122 ..P WKT 2011 02 20 12 24 55 31.3200 -97.3300 251.000 122.0 105.247 4.460 -999.990 -999.990 1.052 ..P WKT 2011 02 20 12 29 55 31.3200 -97.3300 251.000 457.0 112.132 4.430 -999.990 -999.990 1.121 ..P WKT 2011 02 20 12 34 55 31.3200 -97.3300 251.000 30.0 106.678 4.160 -999.990 -999.990 1.067 ..P WKT 2011 02 20 12 39 55 31.3200 -97.3300 251.000 122.0 110.521 4.000 -999.990 -999.990 1.105 ..P WKT 2011 02 20 12 44 55 31.3200 -97.3300 251.000 457.0 111.152 4.110 -999.990 -999.990 1.112 ..P WKT 2011 02 20 12 54 55 31.3200 -97.3300 251.000 30.0 108.462 4.230 -999.990 -999.990 1.085 ..P WKT 2011 02 20 12 59 55 31.3200 -97.3300 251.000 122.0 118.664 4.310 -999.990 -999.990 1.187 ..P WKT 2011 02 20 13 04 55 31.3200 -97.3300 251.000 457.0 111.793 4.100 -999.990 -999.990 1.118 ..P WKT 2011 02 20 13 09 55 31.3200 -97.3300 251.000 30.0 107.119 5.200 -999.990 -999.990 1.071 ..P WKT 2011 02 20 13 14 55 31.3200 -97.3300 251.000 122.0 114.786 6.650 -999.990 -999.990 1.148 ..P WKT 2011 02 20 13 19 55 31.3200 -97.3300 251.000 457.0 109.943 3.690 -999.990 -999.990 1.099 ..P WKT 2011 02 20 13 29 55 31.3200 -97.3300 251.000 30.0 108.154 3.690 -999.990 -999.990 1.082 ..P WKT 2011 02 20 13 34 55 31.3200 -97.3300 251.000 122.0 110.025 4.130 -999.990 -999.990 1.100 ..P WKT 2011 02 20 13 39 55 31.3200 -97.3300 251.000 457.0 110.036 4.540 -999.990 -999.990 1.100 ..P WKT 2011 02 20 13 44 55 31.3200 -97.3300 251.000 30.0 112.415 5.010 -999.990 -999.990 1.124 ..P WKT 2011 02 20 13 49 55 31.3200 -97.3300 251.000 122.0 109.721 4.000 -999.990 -999.990 1.097 ..P WKT 2011 02 20 13 54 55 31.3200 -97.3300 251.000 457.0 105.168 4.880 -999.990 -999.990 1.052 ..P WKT 2011 02 20 14 04 55 31.3200 -97.3300 251.000 30.0 110.141 4.680 -999.990 -999.990 1.101 ..P WKT 2011 02 20 14 09 55 31.3200 -97.3300 251.000 122.0 110.370 3.960 -999.990 -999.990 1.104 ..P WKT 2011 02 20 14 14 55 31.3200 -97.3300 251.000 457.0 109.584 3.800 -999.990 -999.990 1.096 ..P WKT 2011 02 20 14 19 55 31.3200 -97.3300 251.000 30.0 110.151 4.390 -999.990 -999.990 1.102 ..P WKT 2011 02 20 14 24 55 31.3200 -97.3300 251.000 122.0 105.984 4.300 -999.990 -999.990 1.060 ..P WKT 2011 02 20 14 29 55 31.3200 -97.3300 251.000 457.0 109.424 4.830 -999.990 -999.990 1.094 ..P WKT 2011 02 20 14 39 55 31.3200 -97.3300 251.000 30.0 111.573 5.440 -999.990 -999.990 1.116 ..P WKT 2011 02 20 14 44 55 31.3200 -97.3300 251.000 122.0 118.395 3.900 -999.990 -999.990 1.184 ..P WKT 2011 02 20 14 49 55 31.3200 -97.3300 251.000 457.0 112.030 3.960 -999.990 -999.990 1.120 ..P WKT 2011 02 20 14 54 55 31.3200 -97.3300 251.000 30.0 110.737 3.880 -999.990 -999.990 1.107 ..P WKT 2011 02 20 14 59 55 31.3200 -97.3300 251.000 122.0 113.839 4.110 -999.990 -999.990 1.138 ..P WKT 2011 02 20 15 04 55 31.3200 -97.3300 251.000 457.0 110.180 4.340 -999.990 -999.990 1.102 ..P WKT 2011 02 20 15 14 55 31.3200 -97.3300 251.000 30.0 110.589 5.850 -999.990 -999.990 1.106 ..P WKT 2011 02 20 15 19 55 31.3200 -97.3300 251.000 122.0 115.672 3.920 -999.990 -999.990 1.157 ..P WKT 2011 02 20 15 24 55 31.3200 -97.3300 251.000 457.0 109.935 4.920 -999.990 -999.990 1.099 ..P WKT 2011 02 20 15 29 55 31.3200 -97.3300 251.000 30.0 105.551 5.020 -999.990 -999.990 1.056 ..P WKT 2011 02 20 15 34 55 31.3200 -97.3300 251.000 122.0 107.929 4.740 -999.990 -999.990 1.079 ..P WKT 2011 02 20 15 39 55 31.3200 -97.3300 251.000 457.0 108.955 4.100 -999.990 -999.990 1.090 ..P WKT 2011 02 20 15 49 55 31.3200 -97.3300 251.000 30.0 110.668 3.290 -999.990 -999.990 1.107 ..P WKT 2011 02 20 15 54 55 31.3200 -97.3300 251.000 122.0 110.003 3.230 -999.990 -999.990 1.100 ..P WKT 2011 02 20 15 59 55 31.3200 -97.3300 251.000 457.0 106.633 3.530 -999.990 -999.990 1.066 ..P WKT 2011 02 20 16 04 55 31.3200 -97.3300 251.000 30.0 107.658 3.840 -999.990 -999.990 1.077 ..P WKT 2011 02 20 16 09 55 31.3200 -97.3300 251.000 122.0 112.404 3.650 -999.990 -999.990 1.124 ..P WKT 2011 02 20 16 14 55 31.3200 -97.3300 251.000 457.0 107.681 3.490 -999.990 -999.990 1.077 ..P WKT 2011 02 20 16 24 55 31.3200 -97.3300 251.000 30.0 105.240 3.840 -999.990 -999.990 1.052 ..P WKT 2011 02 20 16 29 55 31.3200 -97.3300 251.000 122.0 115.300 4.530 -999.990 -999.990 1.153 ..P WKT 2011 02 20 16 34 55 31.3200 -97.3300 251.000 457.0 107.775 3.880 -999.990 -999.990 1.078 ..P WKT 2011 02 20 16 39 55 31.3200 -97.3300 251.000 30.0 113.438 4.070 -999.990 -999.990 1.134 ..P WKT 2011 02 20 16 44 55 31.3200 -97.3300 251.000 122.0 109.802 5.480 -999.990 -999.990 1.098 ..P WKT 2011 02 20 16 49 55 31.3200 -97.3300 251.000 457.0 113.775 3.620 -999.990 -999.990 1.138 ..P WKT 2011 02 20 17 04 55 31.3200 -97.3300 251.000 30.0 109.823 3.740 -999.990 -999.990 1.098 ..P WKT 2011 02 20 17 09 55 31.3200 -97.3300 251.000 122.0 112.624 4.570 -999.990 -999.990 1.126 ..P WKT 2011 02 20 17 14 55 31.3200 -97.3300 251.000 457.0 111.874 3.680 -999.990 -999.990 1.119 ..P WKT 2011 02 20 17 19 55 31.3200 -97.3300 251.000 30.0 115.691 4.280 -999.990 -999.990 1.157 ..P WKT 2011 02 20 17 24 55 31.3200 -97.3300 251.000 122.0 116.125 3.500 -999.990 -999.990 1.161 ..P WKT 2011 02 20 17 29 55 31.3200 -97.3300 251.000 457.0 108.442 3.790 -999.990 -999.990 1.084 ..P WKT 2011 02 20 17 39 55 31.3200 -97.3300 251.000 30.0 112.003 4.160 -999.990 -999.990 1.120 ..P WKT 2011 02 20 17 44 55 31.3200 -97.3300 251.000 122.0 114.455 3.890 -999.990 -999.990 1.145 ..P WKT 2011 02 20 17 49 55 31.3200 -97.3300 251.000 457.0 113.694 3.810 -999.990 -999.990 1.137 ..P WKT 2011 02 20 17 54 55 31.3200 -97.3300 251.000 30.0 110.903 4.180 -999.990 -999.990 1.109 ..P WKT 2011 02 20 17 59 55 31.3200 -97.3300 251.000 122.0 113.523 3.520 -999.990 -999.990 1.135 ..P WKT 2011 02 20 18 04 55 31.3200 -97.3300 251.000 457.0 113.946 3.730 -999.990 -999.990 1.139 ..P WKT 2011 02 20 18 14 55 31.3200 -97.3300 251.000 30.0 114.307 3.760 -999.990 -999.990 1.143 ..P WKT 2011 02 20 18 19 55 31.3200 -97.3300 251.000 122.0 116.782 4.560 -999.990 -999.990 1.168 ..P WKT 2011 02 20 18 24 55 31.3200 -97.3300 251.000 457.0 114.353 3.730 -999.990 -999.990 1.144 ..P WKT 2011 02 20 18 29 55 31.3200 -97.3300 251.000 30.0 112.094 3.730 -999.990 -999.990 1.121 ..P WKT 2011 02 20 18 34 55 31.3200 -97.3300 251.000 122.0 116.937 3.470 -999.990 -999.990 1.169 ..P WKT 2011 02 20 18 39 55 31.3200 -97.3300 251.000 457.0 109.265 2.990 -999.990 -999.990 1.093 ..P WKT 2011 02 20 18 49 55 31.3200 -97.3300 251.000 30.0 108.757 3.530 -999.990 -999.990 1.088 ..P WKT 2011 02 20 18 54 55 31.3200 -97.3300 251.000 122.0 115.243 3.660 -999.990 -999.990 1.152 ..P WKT 2011 02 20 18 59 55 31.3200 -97.3300 251.000 457.0 113.272 3.530 -999.990 -999.990 1.133 ..P WKT 2011 02 20 19 04 55 31.3200 -97.3300 251.000 30.0 105.552 4.530 -999.990 -999.990 1.056 ..P WKT 2011 02 20 19 09 55 31.3200 -97.3300 251.000 122.0 117.451 5.060 -999.990 -999.990 1.175 ..P WKT 2011 02 20 19 14 55 31.3200 -97.3300 251.000 457.0 110.069 3.770 -999.990 -999.990 1.101 ..P WKT 2011 02 20 19 24 55 31.3200 -97.3300 251.000 30.0 108.932 3.630 -999.990 -999.990 1.089 ..P WKT 2011 02 20 19 29 55 31.3200 -97.3300 251.000 122.0 111.794 3.600 -999.990 -999.990 1.118 ..P WKT 2011 02 20 19 34 55 31.3200 -97.3300 251.000 457.0 104.170 3.830 -999.990 -999.990 1.042 ..P WKT 2011 02 20 19 39 55 31.3200 -97.3300 251.000 30.0 110.753 3.350 -999.990 -999.990 1.108 ..P WKT 2011 02 20 19 44 55 31.3200 -97.3300 251.000 122.0 114.631 3.180 -999.990 -999.990 1.146 ..P WKT 2011 02 20 19 49 55 31.3200 -97.3300 251.000 457.0 114.111 4.050 -999.990 -999.990 1.141 ..P WKT 2011 02 20 19 59 55 31.3200 -97.3300 251.000 30.0 109.929 3.090 -999.990 -999.990 1.099 ..P WKT 2011 02 20 20 04 55 31.3200 -97.3300 251.000 122.0 111.680 3.140 -999.990 -999.990 1.117 ..P WKT 2011 02 20 20 09 55 31.3200 -97.3300 251.000 457.0 108.695 3.630 -999.990 -999.990 1.087 ..P WKT 2011 02 20 20 14 55 31.3200 -97.3300 251.000 30.0 112.476 3.080 -999.990 -999.990 1.125 ..P WKT 2011 02 20 20 19 55 31.3200 -97.3300 251.000 122.0 112.197 3.710 -999.990 -999.990 1.122 ..P WKT 2011 02 20 20 24 55 31.3200 -97.3300 251.000 457.0 111.750 3.510 -999.990 -999.990 1.117 ..P WKT 2011 02 20 20 34 55 31.3200 -97.3300 251.000 30.0 103.581 3.300 -999.990 -999.990 1.036 ..P WKT 2011 02 20 20 39 55 31.3200 -97.3300 251.000 122.0 106.178 4.250 -999.990 -999.990 1.062 ..P WKT 2011 02 20 20 44 55 31.3200 -97.3300 251.000 457.0 106.069 2.910 -999.990 -999.990 1.061 ..P WKT 2011 02 20 20 49 55 31.3200 -97.3300 251.000 30.0 111.202 3.610 -999.990 -999.990 1.112 ..P WKT 2011 02 20 20 54 55 31.3200 -97.3300 251.000 122.0 109.571 3.030 -999.990 -999.990 1.096 ..P WKT 2011 02 20 20 59 55 31.3200 -97.3300 251.000 457.0 104.218 3.320 -999.990 -999.990 1.042 ..P WKT 2011 02 20 21 09 55 31.3200 -97.3300 251.000 30.0 111.682 3.180 -999.990 -999.990 1.117 ..P WKT 2011 02 20 21 14 55 31.3200 -97.3300 251.000 122.0 113.167 3.210 -999.990 -999.990 1.132 ..P WKT 2011 02 20 21 19 55 31.3200 -97.3300 251.000 457.0 111.270 3.560 -999.990 -999.990 1.113 ..P WKT 2011 02 20 21 24 55 31.3200 -97.3300 251.000 30.0 103.960 3.310 -999.990 -999.990 1.040 ..P WKT 2011 02 20 21 29 55 31.3200 -97.3300 251.000 122.0 111.366 4.380 -999.990 -999.990 1.114 ..P WKT 2011 02 20 21 34 55 31.3200 -97.3300 251.000 457.0 109.807 4.500 -999.990 -999.990 1.098 ..P WKT 2011 02 20 21 44 55 31.3200 -97.3300 251.000 30.0 102.580 4.170 -999.990 -999.990 1.026 ..P WKT 2011 02 20 21 49 55 31.3200 -97.3300 251.000 122.0 104.524 4.600 -999.990 -999.990 1.045 ..P WKT 2011 02 20 21 54 55 31.3200 -97.3300 251.000 457.0 102.917 3.940 -999.990 -999.990 1.029 ..P WKT 2011 02 20 21 59 55 31.3200 -97.3300 251.000 30.0 109.597 4.040 -999.990 -999.990 1.096 ..P WKT 2011 02 20 22 04 55 31.3200 -97.3300 251.000 122.0 108.496 5.880 -999.990 -999.990 1.085 ..P WKT 2011 02 20 22 09 55 31.3200 -97.3300 251.000 457.0 109.257 4.140 -999.990 -999.990 1.093 ..P WKT 2011 02 20 22 19 55 31.3200 -97.3300 251.000 30.0 110.295 4.250 -999.990 -999.990 1.103 ..P WKT 2011 02 20 22 24 55 31.3200 -97.3300 251.000 122.0 105.666 4.340 -999.990 -999.990 1.057 ..P WKT 2011 02 20 22 29 55 31.3200 -97.3300 251.000 457.0 110.511 4.350 -999.990 -999.990 1.105 ..P WKT 2011 02 20 22 34 55 31.3200 -97.3300 251.000 30.0 110.280 4.660 -999.990 -999.990 1.103 ..P WKT 2011 02 20 22 39 55 31.3200 -97.3300 251.000 122.0 116.140 4.210 -999.990 -999.990 1.161 ..P WKT 2011 02 20 22 44 55 31.3200 -97.3300 251.000 457.0 112.188 4.710 -999.990 -999.990 1.122 ..P WKT 2011 02 20 22 54 55 31.3200 -97.3300 251.000 30.0 112.017 4.030 -999.990 -999.990 1.120 ..P WKT 2011 02 20 22 59 55 31.3200 -97.3300 251.000 122.0 110.385 3.800 -999.990 -999.990 1.104 ..P WKT 2011 02 20 23 04 55 31.3200 -97.3300 251.000 457.0 115.519 3.490 -999.990 -999.990 1.155 ..P WKT 2011 02 20 23 09 55 31.3200 -97.3300 251.000 30.0 101.032 3.620 -999.990 -999.990 1.010 ..P WKT 2011 02 20 23 14 55 31.3200 -97.3300 251.000 122.0 115.300 3.480 -999.990 -999.990 1.153 ..P WKT 2011 02 20 23 19 55 31.3200 -97.3300 251.000 457.0 107.918 3.070 -999.990 -999.990 1.079 ..P WKT 2011 02 20 23 29 55 31.3200 -97.3300 251.000 30.0 101.518 2.680 -999.990 -999.990 1.015 ..P WKT 2011 02 20 23 34 55 31.3200 -97.3300 251.000 122.0 109.269 2.950 -999.990 -999.990 1.093 ..P WKT 2011 02 20 23 39 55 31.3200 -97.3300 251.000 457.0 105.178 3.030 -999.990 -999.990 1.052 ..P WKT 2011 02 20 23 44 55 31.3200 -97.3300 251.000 30.0 103.793 3.530 -999.990 -999.990 1.038 ..P WKT 2011 02 20 23 49 55 31.3200 -97.3300 251.000 122.0 113.912 4.010 -999.990 -999.990 1.139 ..P WKT 2011 02 21 00 09 55 31.3200 -97.3300 251.000 457.0 111.046 3.370 -999.990 -999.990 1.110 ..P WKT 2011 02 21 00 10 25 31.3200 -97.3300 251.000 457.0 104.652 3.410 -999.990 -999.990 1.047 ..P WKT 2011 02 21 00 10 55 31.3200 -97.3300 251.000 457.0 101.639 4.440 -999.990 -999.990 1.016 ..P WKT 2011 02 21 00 11 25 31.3200 -97.3300 251.000 457.0 106.407 3.800 -999.990 -999.990 1.064 ..P WKT 2011 02 21 00 11 55 31.3200 -97.3300 251.000 457.0 106.439 3.310 -999.990 -999.990 1.064 ..P WKT 2011 02 21 00 12 25 31.3200 -97.3300 251.000 457.0 107.824 3.570 -999.990 -999.990 1.078 ..P WKT 2011 02 21 00 12 55 31.3200 -97.3300 251.000 457.0 104.812 3.920 -999.990 -999.990 1.048 ..P WKT 2011 02 21 00 13 25 31.3200 -97.3300 251.000 457.0 103.491 3.660 -999.990 -999.990 1.035 ..P WKT 2011 02 21 00 13 55 31.3200 -97.3300 251.000 457.0 107.582 4.190 -999.990 -999.990 1.076 ..P WKT 2011 02 21 00 14 25 31.3200 -97.3300 251.000 457.0 108.967 3.220 -999.990 -999.990 1.090 ..P WKT 2011 02 21 00 14 55 31.3200 -97.3300 251.000 457.0 111.367 3.360 -999.990 -999.990 1.114 ..P WKT 2011 02 21 00 19 55 31.3200 -97.3300 251.000 30.0 105.938 3.130 -999.990 -999.990 1.059 ..P WKT 2011 02 21 00 24 55 31.3200 -97.3300 251.000 122.0 105.582 3.150 -999.990 -999.990 1.056 ..P WKT 2011 02 21 00 29 55 31.3200 -97.3300 251.000 457.0 107.931 3.670 -999.990 -999.990 1.079 ..P WKT 2011 02 21 00 34 55 31.3200 -97.3300 251.000 30.0 108.928 2.890 -999.990 -999.990 1.089 ..P WKT 2011 02 21 00 39 55 31.3200 -97.3300 251.000 122.0 105.191 3.870 -999.990 -999.990 1.052 ..P WKT 2011 02 21 00 44 55 31.3200 -97.3300 251.000 457.0 106.864 4.130 -999.990 -999.990 1.069 ..P WKT 2011 02 21 00 54 55 31.3200 -97.3300 251.000 30.0 106.973 2.650 -999.990 -999.990 1.070 ..P WKT 2011 02 21 00 59 55 31.3200 -97.3300 251.000 122.0 109.128 2.940 -999.990 -999.990 1.091 ..P WKT 2011 02 21 01 04 55 31.3200 -97.3300 251.000 457.0 108.579 3.170 -999.990 -999.990 1.086 ..P WKT 2011 02 21 01 09 55 31.3200 -97.3300 251.000 30.0 108.030 2.590 -999.990 -999.990 1.080 ..P WKT 2011 02 21 01 14 55 31.3200 -97.3300 251.000 122.0 114.574 3.170 -999.990 -999.990 1.146 ..P WKT 2011 02 21 01 19 55 31.3200 -97.3300 251.000 457.0 109.972 3.110 -999.990 -999.990 1.100 ..P WKT 2011 02 21 01 29 55 31.3200 -97.3300 251.000 30.0 105.981 4.080 -999.990 -999.990 1.060 ..P WKT 2011 02 21 01 34 55 31.3200 -97.3300 251.000 122.0 109.122 3.030 -999.990 -999.990 1.091 ..P WKT 2011 02 21 01 39 55 31.3200 -97.3300 251.000 457.0 104.837 3.930 -999.990 -999.990 1.048 ..P WKT 2011 02 21 01 44 55 31.3200 -97.3300 251.000 30.0 110.678 3.920 -999.990 -999.990 1.107 ..P WKT 2011 02 21 01 49 55 31.3200 -97.3300 251.000 122.0 107.912 3.370 -999.990 -999.990 1.079 ..P WKT 2011 02 21 01 54 55 31.3200 -97.3300 251.000 457.0 106.833 3.610 -999.990 -999.990 1.068 ..P WKT 2011 02 21 02 04 55 31.3200 -97.3300 251.000 30.0 107.329 4.350 -999.990 -999.990 1.073 ..P WKT 2011 02 21 02 09 55 31.3200 -97.3300 251.000 122.0 111.599 5.320 -999.990 -999.990 1.116 ..P WKT 2011 02 21 02 14 55 31.3200 -97.3300 251.000 457.0 114.689 4.000 -999.990 -999.990 1.147 ..P WKT 2011 02 21 02 19 55 31.3200 -97.3300 251.000 30.0 116.429 4.730 -999.990 -999.990 1.164 ..P WKT 2011 02 21 02 24 55 31.3200 -97.3300 251.000 122.0 114.796 4.040 -999.990 -999.990 1.148 ..P WKT 2011 02 21 02 29 55 31.3200 -97.3300 251.000 457.0 114.345 3.870 -999.990 -999.990 1.143 ..P WKT 2011 02 21 02 39 55 31.3200 -97.3300 251.000 30.0 110.166 3.880 -999.990 -999.990 1.102 ..P WKT 2011 02 21 02 44 55 31.3200 -97.3300 251.000 122.0 118.911 4.680 -999.990 -999.990 1.189 ..P WKT 2011 02 21 02 49 55 31.3200 -97.3300 251.000 457.0 113.500 4.600 -999.990 -999.990 1.135 ..P WKT 2011 02 21 02 54 55 31.3200 -97.3300 251.000 30.0 114.493 5.280 -999.990 -999.990 1.145 ..P WKT 2011 02 21 02 59 55 31.3200 -97.3300 251.000 122.0 113.127 4.450 -999.990 -999.990 1.131 ..P WKT 2011 02 21 03 04 55 31.3200 -97.3300 251.000 457.0 112.435 4.100 -999.990 -999.990 1.124 ..P WKT 2011 02 21 03 14 55 31.3200 -97.3300 251.000 30.0 108.212 3.340 -999.990 -999.990 1.082 ..P WKT 2011 02 21 03 19 55 31.3200 -97.3300 251.000 122.0 113.439 4.310 -999.990 -999.990 1.134 ..P WKT 2011 02 21 03 24 55 31.3200 -97.3300 251.000 457.0 112.602 4.530 -999.990 -999.990 1.126 ..P WKT 2011 02 21 03 29 55 31.3200 -97.3300 251.000 30.0 108.399 4.210 -999.990 -999.990 1.084 ..P WKT 2011 02 21 03 34 55 31.3200 -97.3300 251.000 122.0 116.317 3.990 -999.990 -999.990 1.163 ..P WKT 2011 02 21 03 39 55 31.3200 -97.3300 251.000 457.0 110.094 3.570 -999.990 -999.990 1.101 ..P WKT 2011 02 21 03 49 55 31.3200 -97.3300 251.000 30.0 113.688 3.210 -999.990 -999.990 1.137 ..P WKT 2011 02 21 03 54 55 31.3200 -97.3300 251.000 122.0 116.434 3.880 -999.990 -999.990 1.164 ..P WKT 2011 02 21 03 59 55 31.3200 -97.3300 251.000 457.0 111.104 3.440 -999.990 -999.990 1.111 ..P WKT 2011 02 21 04 04 55 31.3200 -97.3300 251.000 30.0 118.560 3.350 -999.990 -999.990 1.186 ..P WKT 2011 02 21 04 09 55 31.3200 -97.3300 251.000 122.0 124.332 3.520 -999.990 -999.990 1.243 ..P WKT 2011 02 21 04 14 55 31.3200 -97.3300 251.000 457.0 113.285 4.360 -999.990 -999.990 1.133 ..P WKT 2011 02 21 04 24 55 31.3200 -97.3300 251.000 30.0 111.423 4.100 -999.990 -999.990 1.114 ..P WKT 2011 02 21 04 29 55 31.3200 -97.3300 251.000 122.0 112.029 5.990 -999.990 -999.990 1.120 ..P WKT 2011 02 21 04 34 55 31.3200 -97.3300 251.000 457.0 116.837 3.940 -999.990 -999.990 1.168 ..P WKT 2011 02 21 04 39 55 31.3200 -97.3300 251.000 30.0 119.292 3.750 -999.990 -999.990 1.193 ..P WKT 2011 02 21 04 44 55 31.3200 -97.3300 251.000 122.0 115.360 4.190 -999.990 -999.990 1.154 ..P WKT 2011 02 21 04 49 55 31.3200 -97.3300 251.000 457.0 112.268 4.030 -999.990 -999.990 1.123 ..P WKT 2011 02 21 05 04 55 31.3200 -97.3300 251.000 30.0 112.208 3.850 -999.990 -999.990 1.122 ..P WKT 2011 02 21 05 09 55 31.3200 -97.3300 251.000 122.0 114.142 4.740 -999.990 -999.990 1.141 ..P WKT 2011 02 21 05 14 55 31.3200 -97.3300 251.000 457.0 111.542 4.440 -999.990 -999.990 1.115 ..P WKT 2011 02 21 05 19 55 31.3200 -97.3300 251.000 30.0 115.995 3.700 -999.990 -999.990 1.160 ..P WKT 2011 02 21 05 24 55 31.3200 -97.3300 251.000 122.0 112.387 3.510 -999.990 -999.990 1.124 ..P WKT 2011 02 21 05 29 55 31.3200 -97.3300 251.000 457.0 112.306 4.790 -999.990 -999.990 1.123 ..P WKT 2011 02 21 05 39 55 31.3200 -97.3300 251.000 30.0 107.483 3.440 -999.990 -999.990 1.075 ..P WKT 2011 02 21 05 44 55 31.3200 -97.3300 251.000 122.0 112.309 3.930 -999.990 -999.990 1.123 ..P WKT 2011 02 21 05 49 55 31.3200 -97.3300 251.000 457.0 110.420 3.420 -999.990 -999.990 1.104 ..P WKT 2011 02 21 05 54 55 31.3200 -97.3300 251.000 30.0 105.848 3.690 -999.990 -999.990 1.058 ..P WKT 2011 02 21 05 59 55 31.3200 -97.3300 251.000 122.0 114.699 3.550 -999.990 -999.990 1.147 ..P WKT 2011 02 21 06 04 55 31.3200 -97.3300 251.000 457.0 114.656 3.360 -999.990 -999.990 1.147 ..P WKT 2011 02 21 06 14 55 31.3200 -97.3300 251.000 30.0 111.241 4.190 -999.990 -999.990 1.112 ..P WKT 2011 02 21 06 19 55 31.3200 -97.3300 251.000 122.0 111.223 3.380 -999.990 -999.990 1.112 ..P WKT 2011 02 21 06 24 55 31.3200 -97.3300 251.000 457.0 108.355 3.450 -999.990 -999.990 1.084 ..P WKT 2011 02 21 06 29 55 31.3200 -97.3300 251.000 30.0 112.863 4.340 -999.990 -999.990 1.129 ..P WKT 2011 02 21 06 34 55 31.3200 -97.3300 251.000 122.0 115.024 4.330 -999.990 -999.990 1.150 ..P WKT 2011 02 21 06 39 55 31.3200 -97.3300 251.000 457.0 114.504 4.150 -999.990 -999.990 1.145 ..P WKT 2011 02 21 06 49 55 31.3200 -97.3300 251.000 30.0 110.373 3.600 -999.990 -999.990 1.104 ..P WKT 2011 02 21 06 54 55 31.3200 -97.3300 251.000 122.0 111.456 3.570 -999.990 -999.990 1.115 ..P WKT 2011 02 21 06 59 55 31.3200 -97.3300 251.000 457.0 113.880 4.210 -999.990 -999.990 1.139 ..P WKT 2011 02 21 07 04 55 31.3200 -97.3300 251.000 30.0 113.957 5.000 -999.990 -999.990 1.140 ..P WKT 2011 02 21 07 09 55 31.3200 -97.3300 251.000 122.0 116.044 4.620 -999.990 -999.990 1.160 ..P WKT 2011 02 21 07 14 55 31.3200 -97.3300 251.000 457.0 117.461 3.240 -999.990 -999.990 1.175 ..P WKT 2011 02 21 07 24 55 31.3200 -97.3300 251.000 30.0 107.138 3.130 -999.990 -999.990 1.071 ..P WKT 2011 02 21 07 29 55 31.3200 -97.3300 251.000 122.0 111.808 3.180 -999.990 -999.990 1.118 ..P WKT 2011 02 21 07 34 55 31.3200 -97.3300 251.000 457.0 111.455 3.180 -999.990 -999.990 1.115 ..P WKT 2011 02 21 07 39 55 31.3200 -97.3300 251.000 30.0 110.098 3.350 -999.990 -999.990 1.101 ..P WKT 2011 02 21 07 44 55 31.3200 -97.3300 251.000 122.0 112.758 4.030 -999.990 -999.990 1.128 ..P WKT 2011 02 21 07 49 55 31.3200 -97.3300 251.000 457.0 111.066 3.360 -999.990 -999.990 1.111 ..P WKT 2011 02 21 07 59 55 31.3200 -97.3300 251.000 30.0 112.967 3.090 -999.990 -999.990 1.130 ..P WKT 2011 02 21 08 04 55 31.3200 -97.3300 251.000 122.0 110.534 3.350 -999.990 -999.990 1.105 ..P WKT 2011 02 21 08 09 55 31.3200 -97.3300 251.000 457.0 109.442 4.600 -999.990 -999.990 1.094 ..P WKT 2011 02 21 08 14 55 31.3200 -97.3300 251.000 30.0 105.003 4.220 -999.990 -999.990 1.050 ..P WKT 2011 02 21 08 19 55 31.3200 -97.3300 251.000 122.0 107.757 3.850 -999.990 -999.990 1.078 ..P WKT 2011 02 21 08 24 55 31.3200 -97.3300 251.000 457.0 110.845 3.490 -999.990 -999.990 1.108 ..P WKT 2011 02 21 08 34 55 31.3200 -97.3300 251.000 30.0 107.800 3.240 -999.990 -999.990 1.078 ..P WKT 2011 02 21 08 39 55 31.3200 -97.3300 251.000 122.0 108.022 3.670 -999.990 -999.990 1.080 ..P WKT 2011 02 21 08 44 55 31.3200 -97.3300 251.000 457.0 103.897 3.630 -999.990 -999.990 1.039 ..P WKT 2011 02 21 08 49 55 31.3200 -97.3300 251.000 30.0 117.153 4.520 -999.990 -999.990 1.172 ..P WKT 2011 02 21 08 54 55 31.3200 -97.3300 251.000 122.0 115.535 3.220 -999.990 -999.990 1.155 ..P WKT 2011 02 21 08 59 55 31.3200 -97.3300 251.000 457.0 111.579 3.150 -999.990 -999.990 1.116 ..P WKT 2011 02 21 09 09 55 31.3200 -97.3300 251.000 30.0 109.419 3.660 -999.990 -999.990 1.094 ..P WKT 2011 02 21 09 14 55 31.3200 -97.3300 251.000 122.0 111.381 3.240 -999.990 -999.990 1.114 ..P WKT 2011 02 21 09 19 55 31.3200 -97.3300 251.000 457.0 109.837 3.790 -999.990 -999.990 1.098 ..P WKT 2011 02 21 09 24 55 31.3200 -97.3300 251.000 30.0 106.456 4.910 -999.990 -999.990 1.065 ..P WKT 2011 02 21 09 29 55 31.3200 -97.3300 251.000 122.0 111.924 4.460 -999.990 -999.990 1.119 ..P WKT 2011 02 21 09 34 55 31.3200 -97.3300 251.000 457.0 104.704 3.070 -999.990 -999.990 1.047 ..P WKT 2011 02 21 09 44 55 31.3200 -97.3300 251.000 30.0 106.792 3.170 -999.990 -999.990 1.068 ..P WKT 2011 02 21 09 49 55 31.3200 -97.3300 251.000 122.0 109.087 4.260 -999.990 -999.990 1.091 ..P WKT 2011 02 21 09 54 55 31.3200 -97.3300 251.000 457.0 105.875 3.860 -999.990 -999.990 1.059 ..P WKT 2011 02 21 09 59 55 31.3200 -97.3300 251.000 30.0 110.005 5.680 -999.990 -999.990 1.100 ..P WKT 2011 02 21 10 04 55 31.3200 -97.3300 251.000 122.0 111.465 3.960 -999.990 -999.990 1.115 ..P WKT 2011 02 21 10 09 55 31.3200 -97.3300 251.000 457.0 112.590 3.290 -999.990 -999.990 1.126 ..P WKT 2011 02 21 10 19 55 31.3200 -97.3300 251.000 30.0 107.813 3.420 -999.990 -999.990 1.078 ..P WKT 2011 02 21 10 24 55 31.3200 -97.3300 251.000 122.0 109.082 4.140 -999.990 -999.990 1.091 ..P WKT 2011 02 21 10 29 55 31.3200 -97.3300 251.000 457.0 106.682 6.730 -999.990 -999.990 1.067 ..P WKT 2011 02 21 10 34 55 31.3200 -97.3300 251.000 30.0 105.283 4.490 -999.990 -999.990 1.053 ..P WKT 2011 02 21 10 39 55 31.3200 -97.3300 251.000 122.0 118.887 3.430 -999.990 -999.990 1.189 ..P WKT 2011 02 21 10 44 55 31.3200 -97.3300 251.000 457.0 113.820 3.240 -999.990 -999.990 1.138 ..P WKT 2011 02 21 10 54 55 31.3200 -97.3300 251.000 30.0 110.880 4.620 -999.990 -999.990 1.109 ..P WKT 2011 02 21 10 59 55 31.3200 -97.3300 251.000 122.0 118.003 3.310 -999.990 -999.990 1.180 ..P WKT 2011 02 21 11 04 55 31.3200 -97.3300 251.000 457.0 117.794 3.430 -999.990 -999.990 1.178 ..P WKT 2011 02 21 11 09 55 31.3200 -97.3300 251.000 30.0 110.255 3.210 -999.990 -999.990 1.103 ..P WKT 2011 02 21 11 14 55 31.3200 -97.3300 251.000 122.0 114.710 3.800 -999.990 -999.990 1.147 ..P WKT 2011 02 21 11 19 55 31.3200 -97.3300 251.000 457.0 109.173 3.760 -999.990 -999.990 1.092 ..P WKT 2011 02 21 11 29 55 31.3200 -97.3300 251.000 30.0 109.655 2.900 -999.990 -999.990 1.097 ..P WKT 2011 02 21 11 34 55 31.3200 -97.3300 251.000 122.0 113.341 4.440 -999.990 -999.990 1.133 ..P WKT 2011 02 21 11 39 55 31.3200 -97.3300 251.000 457.0 112.033 3.420 -999.990 -999.990 1.120 ..P WKT 2011 02 21 11 44 55 31.3200 -97.3300 251.000 30.0 111.058 6.640 -999.990 -999.990 1.111 ..P WKT 2011 02 21 11 49 55 31.3200 -97.3300 251.000 122.0 109.418 4.670 -999.990 -999.990 1.094 ..P WKT 2011 02 21 12 09 55 31.3200 -97.3300 251.000 457.0 112.346 4.480 -999.990 -999.990 1.123 ..P WKT 2011 02 21 12 10 25 31.3200 -97.3300 251.000 457.0 110.999 4.700 -999.990 -999.990 1.110 ..P WKT 2011 02 21 12 10 55 31.3200 -97.3300 251.000 457.0 111.981 4.240 -999.990 -999.990 1.120 ..P WKT 2011 02 21 12 11 25 31.3200 -97.3300 251.000 457.0 111.964 4.220 -999.990 -999.990 1.120 ..P WKT 2011 02 21 12 11 55 31.3200 -97.3300 251.000 457.0 113.445 4.850 -999.990 -999.990 1.134 ..P WKT 2011 02 21 12 12 25 31.3200 -97.3300 251.000 457.0 108.770 4.170 -999.990 -999.990 1.088 ..P WKT 2011 02 21 12 12 55 31.3200 -97.3300 251.000 457.0 109.918 4.190 -999.990 -999.990 1.099 ..P WKT 2011 02 21 12 13 25 31.3200 -97.3300 251.000 457.0 112.231 4.350 -999.990 -999.990 1.122 ..P WKT 2011 02 21 12 13 55 31.3200 -97.3300 251.000 457.0 111.216 4.320 -999.990 -999.990 1.112 ..P WKT 2011 02 21 12 14 25 31.3200 -97.3300 251.000 457.0 110.201 4.190 -999.990 -999.990 1.102 ..P WKT 2011 02 21 12 14 55 31.3200 -97.3300 251.000 457.0 112.015 4.850 -999.990 -999.990 1.120 ..P WKT 2011 02 21 12 19 55 31.3200 -97.3300 251.000 30.0 112.016 4.230 -999.990 -999.990 1.120 ..P WKT 2011 02 21 12 24 55 31.3200 -97.3300 251.000 122.0 111.518 3.840 -999.990 -999.990 1.115 ..P WKT 2011 02 21 12 29 55 31.3200 -97.3300 251.000 457.0 110.854 3.930 -999.990 -999.990 1.109 ..P WKT 2011 02 21 12 34 55 31.3200 -97.3300 251.000 30.0 110.522 3.810 -999.990 -999.990 1.105 ..P WKT 2011 02 21 12 39 55 31.3200 -97.3300 251.000 122.0 108.527 3.920 -999.990 -999.990 1.085 ..P WKT 2011 02 21 12 44 55 31.3200 -97.3300 251.000 457.0 105.366 3.080 -999.990 -999.990 1.054 ..P WKT 2011 02 21 12 54 55 31.3200 -97.3300 251.000 30.0 111.192 3.090 -999.990 -999.990 1.112 ..P WKT 2011 02 21 12 59 55 31.3200 -97.3300 251.000 122.0 111.692 4.220 -999.990 -999.990 1.117 ..P WKT 2011 02 21 13 04 55 31.3200 -97.3300 251.000 457.0 112.027 3.510 -999.990 -999.990 1.120 ..P WKT 2011 02 21 13 09 55 31.3200 -97.3300 251.000 30.0 111.695 2.810 -999.990 -999.990 1.117 ..P WKT 2011 02 21 13 14 55 31.3200 -97.3300 251.000 122.0 112.695 4.680 -999.990 -999.990 1.127 ..P WKT 2011 02 21 13 19 55 31.3200 -97.3300 251.000 457.0 112.530 3.310 -999.990 -999.990 1.125 ..P WKT 2011 02 21 13 29 55 31.3200 -97.3300 251.000 30.0 110.226 2.960 -999.990 -999.990 1.102 ..P WKT 2011 02 21 13 34 55 31.3200 -97.3300 251.000 122.0 111.416 3.380 -999.990 -999.990 1.114 ..P WKT 2011 02 21 13 39 55 31.3200 -97.3300 251.000 457.0 114.438 3.250 -999.990 -999.990 1.144 ..P WKT 2011 02 21 13 44 55 31.3200 -97.3300 251.000 30.0 109.469 3.790 -999.990 -999.990 1.095 ..P WKT 2011 02 21 13 49 55 31.3200 -97.3300 251.000 122.0 117.983 4.140 -999.990 -999.990 1.180 ..P WKT 2011 02 21 13 54 55 31.3200 -97.3300 251.000 457.0 113.514 3.700 -999.990 -999.990 1.135 ..P WKT 2011 02 21 14 04 55 31.3200 -97.3300 251.000 30.0 116.513 3.420 -999.990 -999.990 1.165 ..P WKT 2011 02 21 14 09 55 31.3200 -97.3300 251.000 122.0 121.818 4.960 -999.990 -999.990 1.218 ..P WKT 2011 02 21 14 14 55 31.3200 -97.3300 251.000 457.0 116.634 4.220 -999.990 -999.990 1.166 ..P WKT 2011 02 21 14 19 55 31.3200 -97.3300 251.000 30.0 123.937 4.830 -999.990 -999.990 1.239 ..P WKT 2011 02 21 14 24 55 31.3200 -97.3300 251.000 122.0 116.922 3.750 -999.990 -999.990 1.169 ..P WKT 2011 02 21 14 29 55 31.3200 -97.3300 251.000 457.0 116.900 4.520 -999.990 -999.990 1.169 ..P WKT 2011 02 21 14 39 55 31.3200 -97.3300 251.000 30.0 121.065 3.790 -999.990 -999.990 1.211 ..P WKT 2011 02 21 14 44 55 31.3200 -97.3300 251.000 122.0 123.255 4.540 -999.990 -999.990 1.233 ..P WKT 2011 02 21 14 49 55 31.3200 -97.3300 251.000 457.0 110.791 3.990 -999.990 -999.990 1.108 ..P WKT 2011 02 21 14 54 55 31.3200 -97.3300 251.000 30.0 124.970 4.010 -999.990 -999.990 1.250 ..P WKT 2011 02 21 14 59 55 31.3200 -97.3300 251.000 122.0 118.834 3.800 -999.990 -999.990 1.188 ..P WKT 2011 02 21 15 04 55 31.3200 -97.3300 251.000 457.0 114.030 3.390 -999.990 -999.990 1.140 ..P WKT 2011 02 21 15 14 55 31.3200 -97.3300 251.000 30.0 121.503 3.540 -999.990 -999.990 1.215 ..P WKT 2011 02 21 15 19 55 31.3200 -97.3300 251.000 122.0 119.458 4.520 -999.990 -999.990 1.195 ..P WKT 2011 02 21 15 24 55 31.3200 -97.3300 251.000 457.0 115.748 4.610 -999.990 -999.990 1.157 ..P WKT 2011 02 21 15 29 55 31.3200 -97.3300 251.000 30.0 120.365 3.950 -999.990 -999.990 1.204 ..P WKT 2011 02 21 15 34 55 31.3200 -97.3300 251.000 122.0 122.650 3.590 -999.990 -999.990 1.227 ..P WKT 2011 02 21 15 39 55 31.3200 -97.3300 251.000 457.0 122.604 4.780 -999.990 -999.990 1.226 ..P WKT 2011 02 21 15 49 55 31.3200 -97.3300 251.000 30.0 120.298 3.190 -999.990 -999.990 1.203 ..P WKT 2011 02 21 15 54 55 31.3200 -97.3300 251.000 122.0 122.703 3.410 -999.990 -999.990 1.227 ..P WKT 2011 02 21 15 59 55 31.3200 -97.3300 251.000 457.0 116.447 3.590 -999.990 -999.990 1.164 ..P WKT 2011 02 21 16 04 55 31.3200 -97.3300 251.000 30.0 118.852 4.180 -999.990 -999.990 1.189 ..P WKT 2011 02 21 16 09 55 31.3200 -97.3300 251.000 122.0 117.259 3.620 -999.990 -999.990 1.173 ..P WKT 2011 02 21 16 14 55 31.3200 -97.3300 251.000 457.0 118.331 3.520 -999.990 -999.990 1.183 ..P WKT 2011 02 21 16 24 55 31.3200 -97.3300 251.000 30.0 116.811 4.960 -999.990 -999.990 1.168 ..P WKT 2011 02 21 16 29 55 31.3200 -97.3300 251.000 122.0 118.383 3.330 -999.990 -999.990 1.184 ..P WKT 2011 02 21 16 34 55 31.3200 -97.3300 251.000 457.0 121.788 3.440 -999.990 -999.990 1.218 ..P WKT 2011 02 21 16 39 55 31.3200 -97.3300 251.000 30.0 114.530 4.010 -999.990 -999.990 1.145 ..P WKT 2011 02 21 16 44 55 31.3200 -97.3300 251.000 122.0 125.098 4.130 -999.990 -999.990 1.251 ..P WKT 2011 02 21 16 49 55 31.3200 -97.3300 251.000 457.0 117.341 4.510 -999.990 -999.990 1.173 ..P WKT 2011 02 21 17 04 55 31.3200 -97.3300 251.000 30.0 123.414 3.820 -999.990 -999.990 1.234 ..P WKT 2011 02 21 17 09 55 31.3200 -97.3300 251.000 122.0 129.580 3.510 -999.990 -999.990 1.296 ..P WKT 2011 02 21 17 14 55 31.3200 -97.3300 251.000 457.0 123.250 3.760 -999.990 -999.990 1.232 ..P WKT 2011 02 21 17 19 55 31.3200 -97.3300 251.000 30.0 129.083 4.280 -999.990 -999.990 1.291 ..P WKT 2011 02 21 17 24 55 31.3200 -97.3300 251.000 122.0 127.919 3.930 -999.990 -999.990 1.279 ..P WKT 2011 02 21 17 29 55 31.3200 -97.3300 251.000 457.0 121.422 3.910 -999.990 -999.990 1.214 ..P WKT 2011 02 21 17 39 55 31.3200 -97.3300 251.000 30.0 118.544 3.620 -999.990 -999.990 1.185 ..P WKT 2011 02 21 17 44 55 31.3200 -97.3300 251.000 122.0 121.497 3.880 -999.990 -999.990 1.215 ..P WKT 2011 02 21 17 49 55 31.3200 -97.3300 251.000 457.0 124.450 4.290 -999.990 -999.990 1.245 ..P WKT 2011 02 21 17 54 55 31.3200 -97.3300 251.000 30.0 117.571 4.660 -999.990 -999.990 1.176 ..P WKT 2011 02 21 17 59 55 31.3200 -97.3300 251.000 122.0 121.859 3.880 -999.990 -999.990 1.219 ..P WKT 2011 02 21 18 04 55 31.3200 -97.3300 251.000 457.0 119.312 5.530 -999.990 -999.990 1.193 ..P WKT 2011 02 21 18 14 55 31.3200 -97.3300 251.000 30.0 117.410 3.370 -999.990 -999.990 1.174 ..P WKT 2011 02 21 18 19 55 31.3200 -97.3300 251.000 122.0 119.888 3.560 -999.990 -999.990 1.199 ..P WKT 2011 02 21 18 24 55 31.3200 -97.3300 251.000 457.0 116.699 4.330 -999.990 -999.990 1.167 ..P WKT 2011 02 21 18 29 55 31.3200 -97.3300 251.000 30.0 114.177 4.560 -999.990 -999.990 1.142 ..P WKT 2011 02 21 18 34 55 31.3200 -97.3300 251.000 122.0 118.321 3.780 -999.990 -999.990 1.183 ..P WKT 2011 02 21 18 39 55 31.3200 -97.3300 251.000 457.0 116.798 3.380 -999.990 -999.990 1.168 ..P WKT 2011 02 21 18 49 55 31.3200 -97.3300 251.000 30.0 107.514 3.730 -999.990 -999.990 1.075 ..P WKT 2011 02 21 18 54 55 31.3200 -97.3300 251.000 122.0 112.421 3.770 -999.990 -999.990 1.124 ..P WKT 2011 02 21 18 59 55 31.3200 -97.3300 251.000 457.0 113.327 4.020 -999.990 -999.990 1.133 ..P WKT 2011 02 21 19 04 55 31.3200 -97.3300 251.000 30.0 113.566 3.720 -999.990 -999.990 1.136 ..P WKT 2011 02 21 19 09 55 31.3200 -97.3300 251.000 122.0 122.474 3.620 -999.990 -999.990 1.225 ..P WKT 2011 02 21 19 14 55 31.3200 -97.3300 251.000 457.0 114.045 3.640 -999.990 -999.990 1.140 ..P WKT 2011 02 21 19 24 55 31.3200 -97.3300 251.000 30.0 110.903 4.040 -999.990 -999.990 1.109 ..P WKT 2011 02 21 19 29 55 31.3200 -97.3300 251.000 122.0 116.859 3.640 -999.990 -999.990 1.169 ..P WKT 2011 02 21 19 34 55 31.3200 -97.3300 251.000 457.0 114.812 3.920 -999.990 -999.990 1.148 ..P WKT 2011 02 21 19 39 55 31.3200 -97.3300 251.000 30.0 111.430 3.980 -999.990 -999.990 1.114 ..P WKT 2011 02 21 19 44 55 31.3200 -97.3300 251.000 122.0 114.385 4.420 -999.990 -999.990 1.144 ..P WKT 2011 02 21 19 49 55 31.3200 -97.3300 251.000 457.0 119.341 3.930 -999.990 -999.990 1.193 ..P WKT 2011 02 21 19 59 55 31.3200 -97.3300 251.000 30.0 114.628 4.750 -999.990 -999.990 1.146 ..P WKT 2011 02 21 20 04 55 31.3200 -97.3300 251.000 122.0 127.135 4.470 -999.990 -999.990 1.271 ..P WKT 2011 02 21 20 09 55 31.3200 -97.3300 251.000 457.0 120.299 4.460 -999.990 -999.990 1.203 ..P WKT 2011 02 21 20 14 55 31.3200 -97.3300 251.000 30.0 118.967 4.100 -999.990 -999.990 1.190 ..P WKT 2011 02 21 20 19 55 31.3200 -97.3300 251.000 122.0 124.472 4.710 -999.990 -999.990 1.245 ..P WKT 2011 02 21 20 24 55 31.3200 -97.3300 251.000 457.0 120.303 4.110 -999.990 -999.990 1.203 ..P WKT 2011 02 21 20 34 55 31.3200 -97.3300 251.000 30.0 117.543 5.040 -999.990 -999.990 1.175 ..P WKT 2011 02 21 20 39 55 31.3200 -97.3300 251.000 122.0 126.454 3.980 -999.990 -999.990 1.265 ..P WKT 2011 02 21 20 44 55 31.3200 -97.3300 251.000 457.0 119.023 4.270 -999.990 -999.990 1.190 ..P WKT 2011 02 21 20 49 55 31.3200 -97.3300 251.000 30.0 118.428 3.930 -999.990 -999.990 1.184 ..P WKT 2011 02 21 20 54 55 31.3200 -97.3300 251.000 122.0 121.504 4.540 -999.990 -999.990 1.215 ..P WKT 2011 02 21 20 59 55 31.3200 -97.3300 251.000 457.0 122.744 4.430 -999.990 -999.990 1.227 ..P WKT 2011 02 21 21 09 55 31.3200 -97.3300 251.000 30.0 114.716 5.080 -999.990 -999.990 1.147 ..P WKT 2011 02 21 21 14 55 31.3200 -97.3300 251.000 122.0 124.131 4.440 -999.990 -999.990 1.241 ..P WKT 2011 02 21 21 19 55 31.3200 -97.3300 251.000 457.0 123.036 4.020 -999.990 -999.990 1.230 ..P WKT 2011 02 21 21 24 55 31.3200 -97.3300 251.000 30.0 123.276 4.180 -999.990 -999.990 1.233 ..P WKT 2011 02 21 21 29 55 31.3200 -97.3300 251.000 122.0 125.016 4.030 -999.990 -999.990 1.250 ..P WKT 2011 02 21 21 34 55 31.3200 -97.3300 251.000 457.0 124.256 5.980 -999.990 -999.990 1.243 ..P WKT 2011 02 21 21 44 55 31.3200 -97.3300 251.000 30.0 124.378 3.840 -999.990 -999.990 1.244 ..P WKT 2011 02 21 21 49 55 31.3200 -97.3300 251.000 122.0 124.927 4.570 -999.990 -999.990 1.249 ..P WKT 2011 02 21 21 54 55 31.3200 -97.3300 251.000 457.0 122.641 4.590 -999.990 -999.990 1.226 ..P WKT 2011 02 21 21 59 55 31.3200 -97.3300 251.000 30.0 126.860 4.870 -999.990 -999.990 1.269 ..P WKT 2011 02 21 22 00 25 31.3200 -97.3300 251.000 30.0 131.587 4.990 -999.990 -999.990 1.316 ..P WKT 2011 02 21 22 00 55 31.3200 -97.3300 251.000 30.0 128.806 4.670 -999.990 -999.990 1.288 ..P WKT 2011 02 21 22 01 25 31.3200 -97.3300 251.000 30.0 129.528 4.800 -999.990 -999.990 1.295 ..P WKT 2011 02 21 22 01 55 31.3200 -97.3300 251.000 30.0 124.745 5.600 -999.990 -999.990 1.247 ..P WKT 2011 02 21 22 02 25 31.3200 -97.3300 251.000 30.0 127.302 5.770 -999.990 -999.990 1.273 ..P WKT 2011 02 21 22 02 55 31.3200 -97.3300 251.000 30.0 134.865 4.810 -999.990 -999.990 1.349 ..P WKT 2011 02 21 22 03 25 31.3200 -97.3300 251.000 30.0 129.915 5.440 -999.990 -999.990 1.299 ..P WKT 2011 02 21 22 03 55 31.3200 -97.3300 251.000 30.0 129.470 5.010 -999.990 -999.990 1.295 ..P WKT 2011 02 21 22 04 25 31.3200 -97.3300 251.000 30.0 128.190 5.050 -999.990 -999.990 1.282 ..P WKT 2011 02 21 22 04 55 31.3200 -97.3300 251.000 30.0 130.581 4.820 -999.990 -999.990 1.306 ..P WKT 2011 02 21 22 09 55 31.3200 -97.3300 251.000 457.0 116.114 5.190 -999.990 -999.990 1.161 ..P WKT 2011 02 21 22 19 55 31.3200 -97.3300 251.000 30.0 126.223 5.160 -999.990 -999.990 1.262 ..P WKT 2011 02 21 22 24 55 31.3200 -97.3300 251.000 122.0 127.107 4.590 -999.990 -999.990 1.271 ..P WKT 2011 02 21 22 29 55 31.3200 -97.3300 251.000 457.0 128.491 4.120 -999.990 -999.990 1.285 ..P WKT 2011 02 21 22 34 55 31.3200 -97.3300 251.000 30.0 131.043 4.710 -999.990 -999.990 1.310 ..P WKT 2011 02 21 22 39 55 31.3200 -97.3300 251.000 122.0 131.427 4.470 -999.990 -999.990 1.314 ..P WKT 2011 02 21 22 44 55 31.3200 -97.3300 251.000 457.0 113.119 3.810 -999.990 -999.990 1.131 ..P WKT 2011 02 21 22 54 55 31.3200 -97.3300 251.000 30.0 150.957 4.160 -999.990 -999.990 1.510 ..P WKT 2011 02 21 22 59 55 31.3200 -97.3300 251.000 122.0 150.196 4.770 -999.990 -999.990 1.502 ..P WKT 2011 02 21 23 04 55 31.3200 -97.3300 251.000 457.0 118.726 5.520 -999.990 -999.990 1.187 ..P WKT 2011 02 21 23 09 55 31.3200 -97.3300 251.000 30.0 148.341 4.240 -999.990 -999.990 1.483 ..P WKT 2011 02 21 23 14 55 31.3200 -97.3300 251.000 122.0 143.240 4.000 -999.990 -999.990 1.432 ..P WKT 2011 02 21 23 19 55 31.3200 -97.3300 251.000 457.0 110.767 3.760 -999.990 -999.990 1.108 ..P WKT 2011 02 21 23 29 55 31.3200 -97.3300 251.000 30.0 158.871 3.690 -999.990 -999.990 1.589 ..P WKT 2011 02 21 23 34 55 31.3200 -97.3300 251.000 122.0 158.331 3.960 -999.990 -999.990 1.583 ..P WKT 2011 02 21 23 39 55 31.3200 -97.3300 251.000 457.0 111.052 3.790 -999.990 -999.990 1.111 ..P WKT 2011 02 21 23 44 55 31.3200 -97.3300 251.000 30.0 153.578 5.120 -999.990 -999.990 1.536 ..P WKT 2011 02 21 23 49 55 31.3200 -97.3300 251.000 122.0 154.039 3.880 -999.990 -999.990 1.540 ..P WKT 2011 02 22 00 09 55 31.3200 -97.3300 251.000 457.0 134.121 4.470 -999.990 -999.990 1.341 ..P WKT 2011 02 22 00 10 25 31.3200 -97.3300 251.000 457.0 130.486 3.700 -999.990 -999.990 1.305 ..P WKT 2011 02 22 00 10 55 31.3200 -97.3300 251.000 457.0 131.526 4.210 -999.990 -999.990 1.315 ..P WKT 2011 02 22 00 11 25 31.3200 -97.3300 251.000 457.0 133.902 3.830 -999.990 -999.990 1.339 ..P WKT 2011 02 22 00 11 55 31.3200 -97.3300 251.000 457.0 129.933 3.990 -999.990 -999.990 1.299 ..P WKT 2011 02 22 00 12 25 31.3200 -97.3300 251.000 457.0 132.309 4.400 -999.990 -999.990 1.323 ..P WKT 2011 02 22 00 12 55 31.3200 -97.3300 251.000 457.0 138.359 4.490 -999.990 -999.990 1.384 ..P WKT 2011 02 22 00 13 25 31.3200 -97.3300 251.000 457.0 137.729 5.100 -999.990 -999.990 1.377 ..P WKT 2011 02 22 00 13 55 31.3200 -97.3300 251.000 457.0 133.760 3.980 -999.990 -999.990 1.338 ..P WKT 2011 02 22 00 14 25 31.3200 -97.3300 251.000 457.0 138.808 4.250 -999.990 -999.990 1.388 ..P WKT 2011 02 22 00 14 55 31.3200 -97.3300 251.000 457.0 133.169 5.180 -999.990 -999.990 1.332 ..P WKT 2011 02 22 00 19 55 31.3200 -97.3300 251.000 30.0 142.905 3.900 -999.990 -999.990 1.429 ..P WKT 2011 02 22 00 24 55 31.3200 -97.3300 251.000 122.0 148.967 4.600 -999.990 -999.990 1.490 ..P WKT 2011 02 22 00 29 55 31.3200 -97.3300 251.000 457.0 127.306 4.620 -999.990 -999.990 1.273 ..P WKT 2011 02 22 00 34 55 31.3200 -97.3300 251.000 30.0 144.393 4.410 -999.990 -999.990 1.444 ..P WKT 2011 02 22 00 39 55 31.3200 -97.3300 251.000 122.0 148.454 4.010 -999.990 -999.990 1.485 ..P WKT 2011 02 22 00 44 55 31.3200 -97.3300 251.000 457.0 125.450 4.570 -999.990 -999.990 1.254 ..P WKT 2011 02 22 00 54 55 31.3200 -97.3300 251.000 30.0 143.892 4.310 -999.990 -999.990 1.439 ..P WKT 2011 02 22 00 59 55 31.3200 -97.3300 251.000 122.0 155.102 5.330 -999.990 -999.990 1.551 ..P WKT 2011 02 22 01 04 55 31.3200 -97.3300 251.000 457.0 125.870 5.010 -999.990 -999.990 1.259 ..P WKT 2011 02 22 01 09 55 31.3200 -97.3300 251.000 30.0 150.786 4.530 -999.990 -999.990 1.508 ..P WKT 2011 02 22 01 14 55 31.3200 -97.3300 251.000 122.0 152.640 3.550 -999.990 -999.990 1.526 ..P WKT 2011 02 22 01 19 55 31.3200 -97.3300 251.000 457.0 120.726 3.550 -999.990 -999.990 1.207 ..P WKT 2011 02 22 01 29 55 31.3200 -97.3300 251.000 30.0 150.916 3.450 -999.990 -999.990 1.509 ..P WKT 2011 02 22 01 34 55 31.3200 -97.3300 251.000 122.0 152.005 3.960 -999.990 -999.990 1.520 ..P WKT 2011 02 22 01 39 55 31.3200 -97.3300 251.000 457.0 114.133 4.550 -999.990 -999.990 1.141 ..P WKT 2011 02 22 01 44 55 31.3200 -97.3300 251.000 30.0 150.337 4.990 -999.990 -999.990 1.503 ..P WKT 2011 02 22 01 49 55 31.3200 -97.3300 251.000 122.0 146.410 5.120 -999.990 -999.990 1.464 ..P WKT 2011 02 22 01 54 55 31.3200 -97.3300 251.000 457.0 121.407 4.290 -999.990 -999.990 1.214 ..P WKT 2011 02 22 02 04 55 31.3200 -97.3300 251.000 30.0 147.647 4.860 -999.990 -999.990 1.476 ..P WKT 2011 02 22 02 09 55 31.3200 -97.3300 251.000 122.0 155.907 4.640 -999.990 -999.990 1.559 ..P WKT 2011 02 22 02 14 55 31.3200 -97.3300 251.000 457.0 123.175 5.110 -999.990 -999.990 1.232 ..P WKT 2011 02 22 02 19 55 31.3200 -97.3300 251.000 30.0 161.220 4.970 -999.990 -999.990 1.612 ..P WKT 2011 02 22 02 24 55 31.3200 -97.3300 251.000 122.0 157.601 5.570 -999.990 -999.990 1.576 ..P WKT 2011 02 22 02 29 55 31.3200 -97.3300 251.000 457.0 117.665 4.060 -999.990 -999.990 1.177 ..P WKT 2011 02 22 02 39 55 31.3200 -97.3300 251.000 30.0 159.081 3.900 -999.990 -999.990 1.591 ..P WKT 2011 02 22 02 44 55 31.3200 -97.3300 251.000 122.0 163.281 4.940 -999.990 -999.990 1.633 ..P WKT 2011 02 22 02 49 55 31.3200 -97.3300 251.000 457.0 130.148 4.230 -999.990 -999.990 1.301 ..P WKT 2011 02 22 02 54 55 31.3200 -97.3300 251.000 30.0 159.294 4.190 -999.990 -999.990 1.593 ..P WKT 2011 02 22 02 59 55 31.3200 -97.3300 251.000 122.0 156.965 3.830 -999.990 -999.990 1.570 ..P WKT 2011 02 22 03 04 55 31.3200 -97.3300 251.000 457.0 131.861 3.880 -999.990 -999.990 1.319 ..P WKT 2011 02 22 03 14 55 31.3200 -97.3300 251.000 30.0 166.485 3.500 -999.990 -999.990 1.665 ..P WKT 2011 02 22 03 19 55 31.3200 -97.3300 251.000 122.0 161.237 4.010 -999.990 -999.990 1.612 ..P WKT 2011 02 22 03 24 55 31.3200 -97.3300 251.000 457.0 136.220 4.100 -999.990 -999.990 1.362 ..P WKT 2011 02 22 03 29 55 31.3200 -97.3300 251.000 30.0 164.475 5.120 -999.990 -999.990 1.645 ..P WKT 2011 02 22 03 34 55 31.3200 -97.3300 251.000 122.0 169.947 4.820 -999.990 -999.990 1.699 ..P WKT 2011 02 22 03 39 55 31.3200 -97.3300 251.000 457.0 148.947 3.560 -999.990 -999.990 1.489 ..P WKT 2011 02 22 03 49 55 31.3200 -97.3300 251.000 30.0 174.496 3.940 -999.990 -999.990 1.745 ..P WKT 2011 02 22 03 54 55 31.3200 -97.3300 251.000 122.0 174.464 4.240 -999.990 -999.990 1.745 ..P WKT 2011 02 22 03 59 55 31.3200 -97.3300 251.000 457.0 138.899 4.590 -999.990 -999.990 1.389 ..P WKT 2011 02 22 04 04 55 31.3200 -97.3300 251.000 30.0 169.709 5.360 -999.990 -999.990 1.697 ..P WKT 2011 02 22 04 09 55 31.3200 -97.3300 251.000 122.0 170.683 4.120 -999.990 -999.990 1.707 ..P WKT 2011 02 22 04 14 55 31.3200 -97.3300 251.000 457.0 140.473 3.540 -999.990 -999.990 1.405 ..P WKT 2011 02 22 04 24 55 31.3200 -97.3300 251.000 30.0 173.869 4.360 -999.990 -999.990 1.739 ..P WKT 2011 02 22 04 29 55 31.3200 -97.3300 251.000 122.0 165.717 3.930 -999.990 -999.990 1.657 ..P WKT 2011 02 22 04 34 55 31.3200 -97.3300 251.000 457.0 149.343 4.500 -999.990 -999.990 1.493 ..P WKT 2011 02 22 04 39 55 31.3200 -97.3300 251.000 30.0 172.385 4.750 -999.990 -999.990 1.724 ..P WKT 2011 02 22 04 44 55 31.3200 -97.3300 251.000 122.0 164.565 4.190 -999.990 -999.990 1.646 ..P WKT 2011 02 22 04 49 55 31.3200 -97.3300 251.000 457.0 143.156 4.000 -999.990 -999.990 1.432 ..P WKT 2011 02 22 05 04 55 31.3200 -97.3300 251.000 30.0 172.988 3.940 -999.990 -999.990 1.730 ..P WKT 2011 02 22 05 09 55 31.3200 -97.3300 251.000 122.0 172.857 4.080 -999.990 -999.990 1.729 ..P WKT 2011 02 22 05 14 55 31.3200 -97.3300 251.000 457.0 149.231 3.850 -999.990 -999.990 1.492 ..P WKT 2011 02 22 05 19 55 31.3200 -97.3300 251.000 30.0 169.575 5.800 -999.990 -999.990 1.696 ..P WKT 2011 02 22 05 24 55 31.3200 -97.3300 251.000 122.0 173.473 4.010 -999.990 -999.990 1.735 ..P WKT 2011 02 22 05 29 55 31.3200 -97.3300 251.000 457.0 147.994 5.880 -999.990 -999.990 1.480 ..P WKT 2011 02 22 05 39 55 31.3200 -97.3300 251.000 30.0 173.517 3.810 -999.990 -999.990 1.735 ..P WKT 2011 02 22 05 44 55 31.3200 -97.3300 251.000 122.0 177.347 4.810 -999.990 -999.990 1.773 ..P WKT 2011 02 22 05 49 55 31.3200 -97.3300 251.000 457.0 140.540 4.270 -999.990 -999.990 1.405 ..P WKT 2011 02 22 05 54 55 31.3200 -97.3300 251.000 30.0 174.765 3.670 -999.990 -999.990 1.748 ..P WKT 2011 02 22 05 59 55 31.3200 -97.3300 251.000 122.0 175.238 3.800 -999.990 -999.990 1.752 ..P WKT 2011 02 22 06 04 55 31.3200 -97.3300 251.000 457.0 149.339 3.490 -999.990 -999.990 1.493 ..P WKT 2011 02 22 06 14 55 31.3200 -97.3300 251.000 30.0 179.104 3.900 -999.990 -999.990 1.791 ..P WKT 2011 02 22 06 19 55 31.3200 -97.3300 251.000 122.0 180.513 3.450 -999.990 -999.990 1.805 ..P WKT 2011 02 22 06 24 55 31.3200 -97.3300 251.000 457.0 161.591 3.290 -999.990 -999.990 1.616 ..P WKT 2011 02 22 06 29 55 31.3200 -97.3300 251.000 30.0 176.274 3.880 -999.990 -999.990 1.763 ..P WKT 2011 02 22 06 34 55 31.3200 -97.3300 251.000 122.0 175.666 4.240 -999.990 -999.990 1.757 ..P WKT 2011 02 22 06 39 55 31.3200 -97.3300 251.000 457.0 156.739 3.390 -999.990 -999.990 1.567 ..P WKT 2011 02 22 06 49 55 31.3200 -97.3300 251.000 30.0 175.476 3.850 -999.990 -999.990 1.755 ..P WKT 2011 02 22 06 54 55 31.3200 -97.3300 251.000 122.0 210.797 3.940 -999.990 -999.990 2.108 ..P WKT 2011 02 22 06 59 55 31.3200 -97.3300 251.000 457.0 209.808 3.670 -999.990 -999.990 2.098 ..P WKT 2011 02 22 07 04 55 31.3200 -97.3300 251.000 30.0 205.455 4.770 -999.990 -999.990 2.055 ..P WKT 2011 02 22 07 09 55 31.3200 -97.3300 251.000 122.0 204.802 3.540 -999.990 -999.990 2.048 ..P WKT 2011 02 22 07 14 55 31.3200 -97.3300 251.000 457.0 270.745 4.860 -999.990 -999.990 2.707 ..P WKT 2011 02 22 07 24 55 31.3200 -97.3300 251.000 30.0 195.104 3.490 -999.990 -999.990 1.951 ..P WKT 2011 02 22 07 29 55 31.3200 -97.3300 251.000 122.0 202.187 3.660 -999.990 -999.990 2.022 ..P WKT 2011 02 22 07 34 55 31.3200 -97.3300 251.000 457.0 209.945 4.940 -999.990 -999.990 2.099 ..P WKT 2011 02 22 07 39 55 31.3200 -97.3300 251.000 30.0 200.542 5.260 -999.990 -999.990 2.005 ..P WKT 2011 02 22 07 44 55 31.3200 -97.3300 251.000 122.0 177.004 6.210 -999.990 -999.990 1.770 ..P WKT 2011 02 22 07 49 55 31.3200 -97.3300 251.000 457.0 167.935 3.420 -999.990 -999.990 1.679 ..P WKT 2011 02 22 07 59 55 31.3200 -97.3300 251.000 30.0 180.060 4.110 -999.990 -999.990 1.801 ..P WKT 2011 02 22 08 04 55 31.3200 -97.3300 251.000 122.0 183.083 4.210 -999.990 -999.990 1.831 ..P WKT 2011 02 22 08 09 55 31.3200 -97.3300 251.000 457.0 129.210 6.520 -999.990 -999.990 1.292 ..P WKT 2011 02 22 08 14 55 31.3200 -97.3300 251.000 30.0 174.653 5.220 -999.990 -999.990 1.747 ..P WKT 2011 02 22 08 19 55 31.3200 -97.3300 251.000 122.0 166.564 4.390 -999.990 -999.990 1.666 ..P WKT 2011 02 22 08 24 55 31.3200 -97.3300 251.000 457.0 124.799 6.170 -999.990 -999.990 1.248 ..P WKT 2011 02 22 08 34 55 31.3200 -97.3300 251.000 30.0 168.463 5.050 -999.990 -999.990 1.685 ..P WKT 2011 02 22 08 39 55 31.3200 -97.3300 251.000 122.0 162.633 5.080 -999.990 -999.990 1.626 ..P WKT 2011 02 22 08 44 55 31.3200 -97.3300 251.000 457.0 125.642 5.410 -999.990 -999.990 1.256 ..P WKT 2011 02 22 08 49 55 31.3200 -97.3300 251.000 30.0 160.403 4.420 -999.990 -999.990 1.604 ..P WKT 2011 02 22 08 54 55 31.3200 -97.3300 251.000 122.0 156.086 3.770 -999.990 -999.990 1.561 ..P WKT 2011 02 22 08 59 55 31.3200 -97.3300 251.000 457.0 128.014 3.770 -999.990 -999.990 1.280 ..P WKT 2011 02 22 09 09 55 31.3200 -97.3300 251.000 30.0 154.928 4.370 -999.990 -999.990 1.549 ..P WKT 2011 02 22 09 14 55 31.3200 -97.3300 251.000 122.0 159.878 4.670 -999.990 -999.990 1.599 ..P WKT 2011 02 22 09 19 55 31.3200 -97.3300 251.000 457.0 137.527 5.210 -999.990 -999.990 1.375 ..P WKT 2011 02 22 09 24 55 31.3200 -97.3300 251.000 30.0 160.174 5.470 -999.990 -999.990 1.602 ..P WKT 2011 02 22 09 29 55 31.3200 -97.3300 251.000 122.0 159.731 4.760 -999.990 -999.990 1.597 ..P WKT 2011 02 22 09 34 55 31.3200 -97.3300 251.000 457.0 134.845 3.640 -999.990 -999.990 1.348 ..P WKT 2011 02 22 09 44 55 31.3200 -97.3300 251.000 30.0 164.498 4.240 -999.990 -999.990 1.645 ..P WKT 2011 02 22 09 49 55 31.3200 -97.3300 251.000 122.0 155.987 4.790 -999.990 -999.990 1.560 ..P WKT 2011 02 22 09 54 55 31.3200 -97.3300 251.000 457.0 128.756 5.240 -999.990 -999.990 1.288 ..P WKT 2011 02 22 09 59 55 31.3200 -97.3300 251.000 30.0 154.138 5.590 -999.990 -999.990 1.541 ..P WKT 2011 02 22 10 04 55 31.3200 -97.3300 251.000 122.0 160.297 4.740 -999.990 -999.990 1.603 ..P WKT 2011 02 22 10 09 55 31.3200 -97.3300 251.000 457.0 125.637 3.800 -999.990 -999.990 1.256 ..P WKT 2011 02 22 10 19 55 31.3200 -97.3300 251.000 30.0 162.198 4.430 -999.990 -999.990 1.622 ..P WKT 2011 02 22 10 24 55 31.3200 -97.3300 251.000 122.0 158.357 4.270 -999.990 -999.990 1.584 ..P WKT 2011 02 22 10 29 55 31.3200 -97.3300 251.000 457.0 128.868 4.540 -999.990 -999.990 1.289 ..P WKT 2011 02 22 10 34 55 31.3200 -97.3300 251.000 30.0 153.374 3.800 -999.990 -999.990 1.534 ..P WKT 2011 02 22 10 39 55 31.3200 -97.3300 251.000 122.0 153.919 4.060 -999.990 -999.990 1.539 ..P WKT 2011 02 22 10 44 55 31.3200 -97.3300 251.000 457.0 122.059 4.010 -999.990 -999.990 1.221 ..P WKT 2011 02 22 10 54 55 31.3200 -97.3300 251.000 30.0 155.121 4.160 -999.990 -999.990 1.551 ..P WKT 2011 02 22 10 59 55 31.3200 -97.3300 251.000 122.0 151.856 4.660 -999.990 -999.990 1.519 ..P WKT 2011 02 22 11 04 55 31.3200 -97.3300 251.000 457.0 124.954 3.860 -999.990 -999.990 1.250 ..P WKT 2011 02 22 11 09 55 31.3200 -97.3300 251.000 30.0 153.429 4.260 -999.990 -999.990 1.534 ..P WKT 2011 02 22 11 14 55 31.3200 -97.3300 251.000 122.0 159.957 4.400 -999.990 -999.990 1.600 ..P WKT 2011 02 22 11 19 55 31.3200 -97.3300 251.000 457.0 129.334 4.770 -999.990 -999.990 1.293 ..P WKT 2011 02 22 11 29 55 31.3200 -97.3300 251.000 30.0 152.975 4.380 -999.990 -999.990 1.530 ..P WKT 2011 02 22 11 34 55 31.3200 -97.3300 251.000 122.0 153.539 4.840 -999.990 -999.990 1.535 ..P WKT 2011 02 22 11 39 55 31.3200 -97.3300 251.000 457.0 126.736 4.700 -999.990 -999.990 1.267 ..P WKT 2011 02 22 11 44 55 31.3200 -97.3300 251.000 30.0 159.398 3.900 -999.990 -999.990 1.594 ..P WKT 2011 02 22 11 49 55 31.3200 -97.3300 251.000 122.0 158.272 4.000 -999.990 -999.990 1.583 ..P WKT 2011 02 22 12 09 55 31.3200 -97.3300 251.000 457.0 120.711 3.830 -999.990 -999.990 1.207 ..P WKT 2011 02 22 12 10 25 31.3200 -97.3300 251.000 457.0 121.077 3.290 -999.990 -999.990 1.211 ..P WKT 2011 02 22 12 10 55 31.3200 -97.3300 251.000 457.0 126.853 3.490 -999.990 -999.990 1.269 ..P WKT 2011 02 22 12 11 25 31.3200 -97.3300 251.000 457.0 125.867 3.190 -999.990 -999.990 1.259 ..P WKT 2011 02 22 12 11 55 31.3200 -97.3300 251.000 457.0 125.557 4.160 -999.990 -999.990 1.256 ..P WKT 2011 02 22 12 12 25 31.3200 -97.3300 251.000 457.0 123.218 3.720 -999.990 -999.990 1.232 ..P WKT 2011 02 22 12 12 55 31.3200 -97.3300 251.000 457.0 125.275 3.250 -999.990 -999.990 1.253 ..P WKT 2011 02 22 12 13 25 31.3200 -97.3300 251.000 457.0 123.275 4.090 -999.990 -999.990 1.233 ..P WKT 2011 02 22 12 13 55 31.3200 -97.3300 251.000 457.0 128.374 4.950 -999.990 -999.990 1.284 ..P WKT 2011 02 22 12 14 25 31.3200 -97.3300 251.000 457.0 133.474 4.530 -999.990 -999.990 1.335 ..P WKT 2011 02 22 12 14 55 31.3200 -97.3300 251.000 457.0 123.698 3.380 -999.990 -999.990 1.237 ..P WKT 2011 02 22 12 19 55 31.3200 -97.3300 251.000 30.0 159.144 3.710 -999.990 -999.990 1.591 ..P WKT 2011 02 22 12 24 55 31.3200 -97.3300 251.000 122.0 165.856 5.010 -999.990 -999.990 1.659 ..P WKT 2011 02 22 12 29 55 31.3200 -97.3300 251.000 457.0 126.911 4.520 -999.990 -999.990 1.269 ..P WKT 2011 02 22 12 34 55 31.3200 -97.3300 251.000 30.0 160.340 4.120 -999.990 -999.990 1.603 ..P WKT 2011 02 22 12 39 55 31.3200 -97.3300 251.000 122.0 161.472 4.210 -999.990 -999.990 1.615 ..P WKT 2011 02 22 12 44 55 31.3200 -97.3300 251.000 457.0 121.332 5.350 -999.990 -999.990 1.213 ..P WKT 2011 02 22 12 54 55 31.3200 -97.3300 251.000 30.0 162.308 4.640 -999.990 -999.990 1.623 ..P WKT 2011 02 22 12 59 55 31.3200 -97.3300 251.000 122.0 160.036 4.660 -999.990 -999.990 1.600 ..P WKT 2011 02 22 13 04 55 31.3200 -97.3300 251.000 457.0 125.102 3.630 -999.990 -999.990 1.251 ..P WKT 2011 02 22 13 09 55 31.3200 -97.3300 251.000 30.0 164.288 3.950 -999.990 -999.990 1.643 ..P WKT 2011 02 22 13 14 55 31.3200 -97.3300 251.000 122.0 165.738 3.630 -999.990 -999.990 1.657 ..P WKT 2011 02 22 13 19 55 31.3200 -97.3300 251.000 457.0 130.963 3.870 -999.990 -999.990 1.310 ..P WKT 2011 02 22 13 29 55 31.3200 -97.3300 251.000 30.0 155.504 3.900 -999.990 -999.990 1.555 ..P WKT 2011 02 22 13 34 55 31.3200 -97.3300 251.000 122.0 158.792 3.770 -999.990 -999.990 1.588 ..P WKT 2011 02 22 13 39 55 31.3200 -97.3300 251.000 457.0 127.026 3.380 -999.990 -999.990 1.270 ..P WKT 2011 02 22 13 44 55 31.3200 -97.3300 251.000 30.0 158.934 4.250 -999.990 -999.990 1.589 ..P WKT 2011 02 22 13 49 55 31.3200 -97.3300 251.000 122.0 162.901 3.490 -999.990 -999.990 1.629 ..P WKT 2011 02 22 13 54 55 31.3200 -97.3300 251.000 457.0 125.705 4.150 -999.990 -999.990 1.257 ..P WKT 2011 02 22 14 04 55 31.3200 -97.3300 251.000 30.0 159.896 3.670 -999.990 -999.990 1.599 ..P WKT 2011 02 22 14 09 55 31.3200 -97.3300 251.000 122.0 162.001 3.480 -999.990 -999.990 1.620 ..P WKT 2011 02 22 14 14 55 31.3200 -97.3300 251.000 457.0 128.688 3.600 -999.990 -999.990 1.287 ..P WKT 2011 02 22 14 19 55 31.3200 -97.3300 251.000 30.0 154.517 5.180 -999.990 -999.990 1.545 ..P WKT 2011 02 22 14 24 55 31.3200 -97.3300 251.000 122.0 165.097 4.410 -999.990 -999.990 1.651 ..P WKT 2011 02 22 14 29 55 31.3200 -97.3300 251.000 457.0 124.823 3.800 -999.990 -999.990 1.248 ..P WKT 2011 02 22 14 39 55 31.3200 -97.3300 251.000 30.0 169.019 4.110 -999.990 -999.990 1.690 ..P WKT 2011 02 22 14 44 55 31.3200 -97.3300 251.000 122.0 166.184 3.610 -999.990 -999.990 1.662 ..P WKT 2011 02 22 14 49 55 31.3200 -97.3300 251.000 457.0 129.092 3.640 -999.990 -999.990 1.291 ..P WKT 2011 02 22 14 54 55 31.3200 -97.3300 251.000 30.0 168.654 3.030 -999.990 -999.990 1.687 ..P WKT 2011 02 22 14 59 55 31.3200 -97.3300 251.000 122.0 165.818 3.220 -999.990 -999.990 1.658 ..P WKT 2011 02 22 15 04 55 31.3200 -97.3300 251.000 457.0 123.964 4.610 -999.990 -999.990 1.240 ..P WKT 2011 02 22 15 14 55 31.3200 -97.3300 251.000 30.0 170.736 3.940 -999.990 -999.990 1.707 ..P WKT 2011 02 22 15 19 55 31.3200 -97.3300 251.000 122.0 180.312 3.000 -999.990 -999.990 1.803 ..P WKT 2011 02 22 15 24 55 31.3200 -97.3300 251.000 457.0 129.132 3.790 -999.990 -999.990 1.291 ..P WKT 2011 02 22 15 29 55 31.3200 -97.3300 251.000 30.0 176.386 3.420 -999.990 -999.990 1.764 ..P WKT 2011 02 22 15 34 55 31.3200 -97.3300 251.000 122.0 178.835 4.220 -999.990 -999.990 1.788 ..P WKT 2011 02 22 15 39 55 31.3200 -97.3300 251.000 457.0 125.602 3.410 -999.990 -999.990 1.256 ..P WKT 2011 02 22 15 49 55 31.3200 -97.3300 251.000 30.0 178.473 3.150 -999.990 -999.990 1.785 ..P WKT 2011 02 22 15 54 55 31.3200 -97.3300 251.000 122.0 179.662 4.260 -999.990 -999.990 1.797 ..P WKT 2011 02 22 15 59 55 31.3200 -97.3300 251.000 457.0 120.729 2.900 -999.990 -999.990 1.207 ..P WKT 2011 02 22 16 04 55 31.3200 -97.3300 251.000 30.0 179.324 3.770 -999.990 -999.990 1.793 ..P WKT 2011 02 22 16 09 55 31.3200 -97.3300 251.000 122.0 178.475 3.220 -999.990 -999.990 1.785 ..P WKT 2011 02 22 16 14 55 31.3200 -97.3300 251.000 457.0 121.223 3.390 -999.990 -999.990 1.212 ..P WKT 2011 02 22 16 24 55 31.3200 -97.3300 251.000 30.0 186.050 3.470 -999.990 -999.990 1.861 ..P WKT 2011 02 22 16 29 55 31.3200 -97.3300 251.000 122.0 180.711 3.620 -999.990 -999.990 1.807 ..P WKT 2011 02 22 16 34 55 31.3200 -97.3300 251.000 457.0 117.584 3.140 -999.990 -999.990 1.176 ..P WKT 2011 02 22 16 39 55 31.3200 -97.3300 251.000 30.0 170.368 4.280 -999.990 -999.990 1.704 ..P WKT 2011 02 22 16 44 55 31.3200 -97.3300 251.000 122.0 178.624 3.370 -999.990 -999.990 1.786 ..P WKT 2011 02 22 16 49 55 31.3200 -97.3300 251.000 457.0 124.148 2.990 -999.990 -999.990 1.241 ..P WKT 2011 02 22 17 04 55 31.3200 -97.3300 251.000 30.0 168.283 3.600 -999.990 -999.990 1.683 ..P WKT 2011 02 22 17 09 55 31.3200 -97.3300 251.000 122.0 172.452 3.210 -999.990 -999.990 1.725 ..P WKT 2011 02 22 17 14 55 31.3200 -97.3300 251.000 457.0 125.932 3.930 -999.990 -999.990 1.259 ..P WKT 2011 02 22 17 19 55 31.3200 -97.3300 251.000 30.0 167.355 4.070 -999.990 -999.990 1.674 ..P WKT 2011 02 22 17 24 55 31.3200 -97.3300 251.000 122.0 166.081 3.850 -999.990 -999.990 1.661 ..P WKT 2011 02 22 17 29 55 31.3200 -97.3300 251.000 457.0 121.077 3.020 -999.990 -999.990 1.211 ..P WKT 2011 02 22 17 39 55 31.3200 -97.3300 251.000 30.0 162.413 3.170 -999.990 -999.990 1.624 ..P WKT 2011 02 22 17 44 55 31.3200 -97.3300 251.000 122.0 167.592 3.720 -999.990 -999.990 1.676 ..P WKT 2011 02 22 17 49 55 31.3200 -97.3300 251.000 457.0 125.108 5.010 -999.990 -999.990 1.251 ..P WKT 2011 02 22 17 54 55 31.3200 -97.3300 251.000 30.0 164.161 4.890 -999.990 -999.990 1.642 ..P WKT 2011 02 22 17 59 55 31.3200 -97.3300 251.000 122.0 165.936 3.140 -999.990 -999.990 1.659 ..P WKT 2011 02 22 18 04 55 31.3200 -97.3300 251.000 457.0 131.442 2.830 -999.990 -999.990 1.314 ..P WKT 2011 02 22 18 14 55 31.3200 -97.3300 251.000 30.0 169.583 4.010 -999.990 -999.990 1.696 ..P WKT 2011 02 22 18 19 55 31.3200 -97.3300 251.000 122.0 168.828 3.350 -999.990 -999.990 1.688 ..P WKT 2011 02 22 18 24 55 31.3200 -97.3300 251.000 457.0 128.382 3.670 -999.990 -999.990 1.284 ..P WKT 2011 02 22 18 29 55 31.3200 -97.3300 251.000 30.0 168.000 4.190 -999.990 -999.990 1.680 ..P WKT 2011 02 22 18 34 55 31.3200 -97.3300 251.000 122.0 174.231 4.130 -999.990 -999.990 1.742 ..P WKT 2011 02 22 18 39 55 31.3200 -97.3300 251.000 457.0 144.679 3.110 -999.990 -999.990 1.447 ..P WKT 2011 02 22 18 49 55 31.3200 -97.3300 251.000 30.0 161.790 3.690 -999.990 -999.990 1.618 ..P WKT 2011 02 22 18 54 55 31.3200 -97.3300 251.000 122.0 167.218 3.800 -999.990 -999.990 1.672 ..P WKT 2011 02 22 18 59 55 31.3200 -97.3300 251.000 457.0 152.533 4.060 -999.990 -999.990 1.525 ..P WKT 2011 02 22 19 04 55 31.3200 -97.3300 251.000 30.0 161.031 3.810 -999.990 -999.990 1.610 ..P WKT 2011 02 22 19 09 55 31.3200 -97.3300 251.000 122.0 165.097 4.070 -999.990 -999.990 1.651 ..P WKT 2011 02 22 19 14 55 31.3200 -97.3300 251.000 457.0 147.678 4.130 -999.990 -999.990 1.477 ..P WKT 2011 02 22 19 24 55 31.3200 -97.3300 251.000 30.0 161.123 2.930 -999.990 -999.990 1.611 ..P WKT 2011 02 22 19 29 55 31.3200 -97.3300 251.000 122.0 169.821 3.850 -999.990 -999.990 1.698 ..P WKT 2011 02 22 19 34 55 31.3200 -97.3300 251.000 457.0 144.743 4.960 -999.990 -999.990 1.447 ..P WKT 2011 02 22 19 39 55 31.3200 -97.3300 251.000 30.0 162.313 3.680 -999.990 -999.990 1.623 ..P WKT 2011 02 22 19 44 55 31.3200 -97.3300 251.000 122.0 162.824 4.200 -999.990 -999.990 1.628 ..P WKT 2011 02 22 19 49 55 31.3200 -97.3300 251.000 457.0 149.683 3.510 -999.990 -999.990 1.497 ..P WKT 2011 02 22 19 59 55 31.3200 -97.3300 251.000 30.0 164.040 3.220 -999.990 -999.990 1.640 ..P WKT 2011 02 22 20 04 55 31.3200 -97.3300 251.000 122.0 164.235 3.170 -999.990 -999.990 1.642 ..P WKT 2011 02 22 20 09 55 31.3200 -97.3300 251.000 457.0 144.625 2.950 -999.990 -999.990 1.446 ..P WKT 2011 02 22 20 14 55 31.3200 -97.3300 251.000 30.0 172.135 4.030 -999.990 -999.990 1.721 ..P WKT 2011 02 22 20 19 55 31.3200 -97.3300 251.000 122.0 165.159 3.720 -999.990 -999.990 1.652 ..P WKT 2011 02 22 20 24 55 31.3200 -97.3300 251.000 457.0 140.419 3.430 -999.990 -999.990 1.404 ..P WKT 2011 02 22 20 34 55 31.3200 -97.3300 251.000 30.0 163.716 4.490 -999.990 -999.990 1.637 ..P WKT 2011 02 22 20 39 55 31.3200 -97.3300 251.000 122.0 164.277 3.780 -999.990 -999.990 1.643 ..P WKT 2011 02 22 20 44 55 31.3200 -97.3300 251.000 457.0 137.843 2.890 -999.990 -999.990 1.378 ..P WKT 2011 02 22 20 49 55 31.3200 -97.3300 251.000 30.0 164.031 3.350 -999.990 -999.990 1.640 ..P WKT 2011 02 22 20 54 55 31.3200 -97.3300 251.000 122.0 159.635 3.230 -999.990 -999.990 1.596 ..P WKT 2011 02 22 20 59 55 31.3200 -97.3300 251.000 457.0 146.182 3.200 -999.990 -999.990 1.462 ..P WKT 2011 02 22 21 09 55 31.3200 -97.3300 251.000 30.0 166.054 2.870 -999.990 -999.990 1.661 ..P WKT 2011 02 22 21 14 55 31.3200 -97.3300 251.000 122.0 170.156 3.740 -999.990 -999.990 1.702 ..P WKT 2011 02 22 21 19 55 31.3200 -97.3300 251.000 457.0 152.032 3.550 -999.990 -999.990 1.520 ..P WKT 2011 02 22 21 24 55 31.3200 -97.3300 251.000 30.0 168.958 3.940 -999.990 -999.990 1.690 ..P WKT 2011 02 22 21 29 55 31.3200 -97.3300 251.000 122.0 168.787 3.620 -999.990 -999.990 1.688 ..P WKT 2011 02 22 21 34 55 31.3200 -97.3300 251.000 457.0 153.565 4.320 -999.990 -999.990 1.536 ..P WKT 2011 02 22 21 44 55 31.3200 -97.3300 251.000 30.0 163.433 3.740 -999.990 -999.990 1.634 ..P WKT 2011 02 22 21 49 55 31.3200 -97.3300 251.000 122.0 163.041 3.760 -999.990 -999.990 1.630 ..P WKT 2011 02 22 21 54 55 31.3200 -97.3300 251.000 457.0 166.414 3.830 -999.990 -999.990 1.664 ..P WKT 2011 02 22 21 59 55 31.3200 -97.3300 251.000 30.0 168.589 3.160 -999.990 -999.990 1.686 ..P WKT 2011 02 22 22 04 55 31.3200 -97.3300 251.000 122.0 171.619 3.750 -999.990 -999.990 1.716 ..P WKT 2011 02 22 22 09 55 31.3200 -97.3300 251.000 457.0 155.653 4.430 -999.990 -999.990 1.557 ..P WKT 2011 02 22 22 19 55 31.3200 -97.3300 251.000 30.0 169.589 3.100 -999.990 -999.990 1.696 ..P WKT 2011 02 22 22 24 55 31.3200 -97.3300 251.000 122.0 172.964 2.890 -999.990 -999.990 1.730 ..P WKT 2011 02 22 22 29 55 31.3200 -97.3300 251.000 457.0 160.416 2.920 -999.990 -999.990 1.604 ..P WKT 2011 02 22 22 34 55 31.3200 -97.3300 251.000 30.0 167.386 4.590 -999.990 -999.990 1.674 ..P WKT 2011 02 22 22 39 55 31.3200 -97.3300 251.000 122.0 166.823 3.300 -999.990 -999.990 1.668 ..P WKT 2011 02 22 22 44 55 31.3200 -97.3300 251.000 457.0 157.353 2.820 -999.990 -999.990 1.574 ..P WKT 2011 02 22 22 54 55 31.3200 -97.3300 251.000 30.0 171.739 3.650 -999.990 -999.990 1.717 ..P WKT 2011 02 22 22 59 55 31.3200 -97.3300 251.000 122.0 166.820 2.780 -999.990 -999.990 1.668 ..P WKT 2011 02 22 23 04 55 31.3200 -97.3300 251.000 457.0 164.640 4.750 -999.990 -999.990 1.646 ..P WKT 2011 02 22 23 09 55 31.3200 -97.3300 251.000 30.0 171.715 4.460 -999.990 -999.990 1.717 ..P WKT 2011 02 22 23 14 55 31.3200 -97.3300 251.000 122.0 172.621 4.180 -999.990 -999.990 1.726 ..P WKT 2011 02 22 23 19 55 31.3200 -97.3300 251.000 457.0 170.785 3.940 -999.990 -999.990 1.708 ..P WKT 2011 02 22 23 29 55 31.3200 -97.3300 251.000 30.0 176.043 2.970 -999.990 -999.990 1.760 ..P WKT 2011 02 22 23 34 55 31.3200 -97.3300 251.000 122.0 173.197 5.730 -999.990 -999.990 1.732 ..P WKT 2011 02 22 23 39 55 31.3200 -97.3300 251.000 457.0 168.633 4.260 -999.990 -999.990 1.686 ..P WKT 2011 02 22 23 44 55 31.3200 -97.3300 251.000 30.0 172.988 5.010 -999.990 -999.990 1.730 ..P WKT 2011 02 22 23 49 55 31.3200 -97.3300 251.000 122.0 163.965 4.940 -999.990 -999.990 1.640 ..P WKT 2011 02 23 00 09 55 31.3200 -97.3300 251.000 457.0 161.703 2.960 -999.990 -999.990 1.617 ..P WKT 2011 02 23 00 10 25 31.3200 -97.3300 251.000 457.0 162.135 3.680 -999.990 -999.990 1.621 ..P WKT 2011 02 23 00 10 55 31.3200 -97.3300 251.000 457.0 164.281 3.260 -999.990 -999.990 1.643 ..P WKT 2011 02 23 00 11 25 31.3200 -97.3300 251.000 457.0 160.253 3.430 -999.990 -999.990 1.603 ..P WKT 2011 02 23 00 11 55 31.3200 -97.3300 251.000 457.0 163.770 3.980 -999.990 -999.990 1.638 ..P WKT 2011 02 23 00 12 25 31.3200 -97.3300 251.000 457.0 156.313 3.590 -999.990 -999.990 1.563 ..P WKT 2011 02 23 00 12 55 31.3200 -97.3300 251.000 457.0 158.801 3.750 -999.990 -999.990 1.588 ..P WKT 2011 02 23 00 13 25 31.3200 -97.3300 251.000 457.0 161.976 4.680 -999.990 -999.990 1.620 ..P WKT 2011 02 23 00 13 55 31.3200 -97.3300 251.000 457.0 157.262 3.860 -999.990 -999.990 1.573 ..P WKT 2011 02 23 00 14 25 31.3200 -97.3300 251.000 457.0 162.494 3.870 -999.990 -999.990 1.625 ..P WKT 2011 02 23 00 14 55 31.3200 -97.3300 251.000 457.0 163.096 3.990 -999.990 -999.990 1.631 ..P WKT 2011 02 23 00 19 55 31.3200 -97.3300 251.000 30.0 164.318 4.760 -999.990 -999.990 1.643 ..P WKT 2011 02 23 00 24 55 31.3200 -97.3300 251.000 122.0 163.482 5.650 -999.990 -999.990 1.635 ..P WKT 2011 02 23 00 29 55 31.3200 -97.3300 251.000 457.0 163.331 5.990 -999.990 -999.990 1.633 ..P WKT 2011 02 23 00 34 55 31.3200 -97.3300 251.000 30.0 168.664 3.300 -999.990 -999.990 1.687 ..P WKT 2011 02 23 00 39 55 31.3200 -97.3300 251.000 122.0 171.254 2.840 -999.990 -999.990 1.713 ..P WKT 2011 02 23 00 44 55 31.3200 -97.3300 251.000 457.0 167.333 2.960 -999.990 -999.990 1.673 ..P WKT 2011 02 23 00 54 55 31.3200 -97.3300 251.000 30.0 176.270 2.950 -999.990 -999.990 1.763 ..P WKT 2011 02 23 00 59 55 31.3200 -97.3300 251.000 122.0 165.666 2.940 -999.990 -999.990 1.657 ..P WKT 2011 02 23 01 04 55 31.3200 -97.3300 251.000 457.0 170.985 3.610 -999.990 -999.990 1.710 ..P WKT 2011 02 23 01 09 55 31.3200 -97.3300 251.000 30.0 186.228 3.800 -999.990 -999.990 1.862 ..P WKT 2011 02 23 01 14 55 31.3200 -97.3300 251.000 122.0 168.270 3.550 -999.990 -999.990 1.683 ..P WKT 2011 02 23 01 19 55 31.3200 -97.3300 251.000 457.0 185.562 3.310 -999.990 -999.990 1.856 ..P WKT 2011 02 23 01 29 55 31.3200 -97.3300 251.000 30.0 181.425 3.590 -999.990 -999.990 1.814 ..P WKT 2011 02 23 01 34 55 31.3200 -97.3300 251.000 122.0 170.271 3.240 -999.990 -999.990 1.703 ..P WKT 2011 02 23 01 39 55 31.3200 -97.3300 251.000 457.0 165.618 4.660 -999.990 -999.990 1.656 ..P WKT 2011 02 23 01 44 55 31.3200 -97.3300 251.000 30.0 269.514 9.130 -999.990 -999.990 2.695 ..P WKT 2011 02 23 01 49 55 31.3200 -97.3300 251.000 122.0 166.742 5.470 -999.990 -999.990 1.667 ..P WKT 2011 02 23 01 54 55 31.3200 -97.3300 251.000 457.0 168.072 4.850 -999.990 -999.990 1.681 ..P WKT 2011 02 23 02 04 55 31.3200 -97.3300 251.000 30.0 177.125 4.380 -999.990 -999.990 1.771 ..P WKT 2011 02 23 02 09 55 31.3200 -97.3300 251.000 122.0 165.717 5.220 -999.990 -999.990 1.657 ..P WKT 2011 02 23 02 14 55 31.3200 -97.3300 251.000 457.0 170.194 5.400 -999.990 -999.990 1.702 ..P WKT 2011 02 23 02 19 55 31.3200 -97.3300 251.000 30.0 170.571 4.750 -999.990 -999.990 1.706 ..P WKT 2011 02 23 02 24 55 31.3200 -97.3300 251.000 122.0 165.486 4.480 -999.990 -999.990 1.655 ..P WKT 2011 02 23 02 29 55 31.3200 -97.3300 251.000 457.0 173.715 4.180 -999.990 -999.990 1.737 ..P WKT 2011 02 23 02 39 55 31.3200 -97.3300 251.000 30.0 163.963 3.610 -999.990 -999.990 1.640 ..P WKT 2011 02 23 02 44 55 31.3200 -97.3300 251.000 122.0 160.661 4.310 -999.990 -999.990 1.607 ..P WKT 2011 02 23 02 49 55 31.3200 -97.3300 251.000 457.0 148.832 4.420 -999.990 -999.990 1.488 ..P WKT 2011 02 23 02 54 55 31.3200 -97.3300 251.000 30.0 161.224 4.000 -999.990 -999.990 1.612 ..P WKT 2011 02 23 02 59 55 31.3200 -97.3300 251.000 122.0 167.813 3.330 -999.990 -999.990 1.678 ..P WKT 2011 02 23 03 04 55 31.3200 -97.3300 251.000 457.0 161.786 3.160 -999.990 -999.990 1.618 ..P WKT 2011 02 23 03 14 55 31.3200 -97.3300 251.000 30.0 172.524 3.460 -999.990 -999.990 1.725 ..P WKT 2011 02 23 03 19 55 31.3200 -97.3300 251.000 122.0 160.656 3.160 -999.990 -999.990 1.607 ..P WKT 2011 02 23 03 24 55 31.3200 -97.3300 251.000 457.0 163.444 3.340 -999.990 -999.990 1.634 ..P WKT 2011 02 23 03 29 55 31.3200 -97.3300 251.000 30.0 183.945 4.700 -999.990 -999.990 1.839 ..P WKT 2011 02 23 03 34 55 31.3200 -97.3300 251.000 122.0 173.444 3.490 -999.990 -999.990 1.734 ..P WKT 2011 02 23 03 39 55 31.3200 -97.3300 251.000 457.0 168.395 3.190 -999.990 -999.990 1.684 ..P WKT 2011 02 23 03 49 55 31.3200 -97.3300 251.000 30.0 169.781 3.610 -999.990 -999.990 1.698 ..P WKT 2011 02 23 03 54 55 31.3200 -97.3300 251.000 122.0 175.870 4.010 -999.990 -999.990 1.759 ..P WKT 2011 02 23 03 59 55 31.3200 -97.3300 251.000 457.0 155.753 3.820 -999.990 -999.990 1.558 ..P WKT 2011 02 23 04 04 55 31.3200 -97.3300 251.000 30.0 172.392 5.140 -999.990 -999.990 1.724 ..P WKT 2011 02 23 04 09 55 31.3200 -97.3300 251.000 122.0 177.458 4.870 -999.990 -999.990 1.775 ..P WKT 2011 02 23 04 14 55 31.3200 -97.3300 251.000 457.0 170.277 4.800 -999.990 -999.990 1.703 ..P WKT 2011 02 23 04 24 55 31.3200 -97.3300 251.000 30.0 172.267 3.310 -999.990 -999.990 1.723 ..P WKT 2011 02 23 04 29 55 31.3200 -97.3300 251.000 122.0 176.504 3.290 -999.990 -999.990 1.765 ..P WKT 2011 02 23 04 34 55 31.3200 -97.3300 251.000 457.0 190.937 4.420 -999.990 -999.990 1.909 ..P WKT 2011 02 23 04 39 55 31.3200 -97.3300 251.000 30.0 170.358 3.780 -999.990 -999.990 1.704 ..P WKT 2011 02 23 04 44 55 31.3200 -97.3300 251.000 122.0 169.836 5.540 -999.990 -999.990 1.698 ..P WKT 2011 02 23 04 49 55 31.3200 -97.3300 251.000 457.0 197.172 4.460 -999.990 -999.990 1.972 ..P WKT 2011 02 23 05 04 55 31.3200 -97.3300 251.000 30.0 168.590 3.180 -999.990 -999.990 1.686 ..P WKT 2011 02 23 05 09 55 31.3200 -97.3300 251.000 122.0 185.805 3.850 -999.990 -999.990 1.858 ..P WKT 2011 02 23 05 14 55 31.3200 -97.3300 251.000 457.0 174.500 4.750 -999.990 -999.990 1.745 ..P WKT 2011 02 23 05 19 55 31.3200 -97.3300 251.000 30.0 173.380 4.340 -999.990 -999.990 1.734 ..P WKT 2011 02 23 05 24 55 31.3200 -97.3300 251.000 122.0 175.824 4.910 -999.990 -999.990 1.758 ..P WKT 2011 02 23 05 29 55 31.3200 -97.3300 251.000 457.0 166.732 3.530 -999.990 -999.990 1.667 ..P WKT 2011 02 23 05 39 55 31.3200 -97.3300 251.000 30.0 170.956 4.370 -999.990 -999.990 1.710 ..P WKT 2011 02 23 05 44 55 31.3200 -97.3300 251.000 122.0 180.027 5.480 -999.990 -999.990 1.800 ..P WKT 2011 02 23 05 49 55 31.3200 -97.3300 251.000 457.0 146.543 5.570 -999.990 -999.990 1.465 ..P WKT 2011 02 23 05 54 55 31.3200 -97.3300 251.000 30.0 180.023 6.530 -999.990 -999.990 1.800 ..P WKT 2011 02 23 05 59 55 31.3200 -97.3300 251.000 122.0 184.172 6.170 -999.990 -999.990 1.842 ..P WKT 2011 02 23 06 04 55 31.3200 -97.3300 251.000 457.0 146.129 4.030 -999.990 -999.990 1.461 ..P WKT 2011 02 23 06 14 55 31.3200 -97.3300 251.000 30.0 183.570 4.230 -999.990 -999.990 1.836 ..P WKT 2011 02 23 06 19 55 31.3200 -97.3300 251.000 122.0 188.733 6.420 -999.990 -999.990 1.887 ..P WKT 2011 02 23 06 24 55 31.3200 -97.3300 251.000 457.0 142.756 6.200 -999.990 -999.990 1.428 ..P WKT 2011 02 23 06 29 55 31.3200 -97.3300 251.000 30.0 176.705 5.850 -999.990 -999.990 1.767 ..P WKT 2011 02 23 06 34 55 31.3200 -97.3300 251.000 122.0 185.591 4.590 -999.990 -999.990 1.856 ..P WKT 2011 02 23 06 39 55 31.3200 -97.3300 251.000 457.0 135.237 3.860 -999.990 -999.990 1.352 ..P WKT 2011 02 23 06 49 55 31.3200 -97.3300 251.000 30.0 172.952 3.930 -999.990 -999.990 1.730 ..P WKT 2011 02 23 06 54 55 31.3200 -97.3300 251.000 122.0 184.853 5.230 -999.990 -999.990 1.849 ..P WKT 2011 02 23 06 59 55 31.3200 -97.3300 251.000 457.0 124.700 5.010 -999.990 -999.990 1.247 ..P WKT 2011 02 23 07 04 55 31.3200 -97.3300 251.000 30.0 173.468 5.170 -999.990 -999.990 1.735 ..P WKT 2011 02 23 07 09 55 31.3200 -97.3300 251.000 122.0 172.175 3.870 -999.990 -999.990 1.722 ..P WKT 2011 02 23 07 14 55 31.3200 -97.3300 251.000 457.0 132.678 5.490 -999.990 -999.990 1.327 ..P WKT 2011 02 23 07 24 55 31.3200 -97.3300 251.000 30.0 177.906 4.320 -999.990 -999.990 1.779 ..P WKT 2011 02 23 07 29 55 31.3200 -97.3300 251.000 122.0 178.109 4.340 -999.990 -999.990 1.781 ..P WKT 2011 02 23 07 34 55 31.3200 -97.3300 251.000 457.0 138.106 3.360 -999.990 -999.990 1.381 ..P WKT 2011 02 23 07 39 55 31.3200 -97.3300 251.000 30.0 184.258 3.570 -999.990 -999.990 1.843 ..P WKT 2011 02 23 07 44 55 31.3200 -97.3300 251.000 122.0 163.182 4.580 -999.990 -999.990 1.632 ..P WKT 2011 02 23 07 49 55 31.3200 -97.3300 251.000 457.0 141.100 3.160 -999.990 -999.990 1.411 ..P WKT 2011 02 23 07 59 55 31.3200 -97.3300 251.000 30.0 174.456 3.950 -999.990 -999.990 1.745 ..P WKT 2011 02 23 08 04 55 31.3200 -97.3300 251.000 122.0 164.390 4.450 -999.990 -999.990 1.644 ..P WKT 2011 02 23 08 09 55 31.3200 -97.3300 251.000 457.0 128.173 3.830 -999.990 -999.990 1.282 ..P WKT 2011 02 23 08 14 55 31.3200 -97.3300 251.000 30.0 181.718 4.630 -999.990 -999.990 1.817 ..P WKT 2011 02 23 08 19 55 31.3200 -97.3300 251.000 122.0 153.101 4.270 -999.990 -999.990 1.531 ..P WKT 2011 02 23 08 24 55 31.3200 -97.3300 251.000 457.0 122.132 3.370 -999.990 -999.990 1.221 ..P WKT 2011 02 23 08 34 55 31.3200 -97.3300 251.000 30.0 177.204 4.270 -999.990 -999.990 1.772 ..P WKT 2011 02 23 08 39 55 31.3200 -97.3300 251.000 122.0 153.134 4.450 -999.990 -999.990 1.531 ..P WKT 2011 02 23 08 44 55 31.3200 -97.3300 251.000 457.0 121.657 3.560 -999.990 -999.990 1.217 ..P WKT 2011 02 23 08 49 55 31.3200 -97.3300 251.000 30.0 173.937 4.360 -999.990 -999.990 1.739 ..P WKT 2011 02 23 08 54 55 31.3200 -97.3300 251.000 122.0 133.874 4.620 -999.990 -999.990 1.339 ..P WKT 2011 02 23 08 59 55 31.3200 -97.3300 251.000 457.0 125.494 3.510 -999.990 -999.990 1.255 ..P WKT 2011 02 23 09 09 55 31.3200 -97.3300 251.000 30.0 166.355 3.980 -999.990 -999.990 1.664 ..P WKT 2011 02 23 09 14 55 31.3200 -97.3300 251.000 122.0 136.951 3.500 -999.990 -999.990 1.370 ..P WKT 2011 02 23 09 19 55 31.3200 -97.3300 251.000 457.0 126.579 3.890 -999.990 -999.990 1.266 ..P WKT 2011 02 23 09 24 55 31.3200 -97.3300 251.000 30.0 169.901 4.130 -999.990 -999.990 1.699 ..P WKT 2011 02 23 09 29 55 31.3200 -97.3300 251.000 122.0 142.531 3.380 -999.990 -999.990 1.425 ..P WKT 2011 02 23 09 34 55 31.3200 -97.3300 251.000 457.0 129.808 3.580 -999.990 -999.990 1.298 ..P WKT 2011 02 23 09 44 55 31.3200 -97.3300 251.000 30.0 154.521 3.500 -999.990 -999.990 1.545 ..P WKT 2011 02 23 09 49 55 31.3200 -97.3300 251.000 122.0 160.661 3.620 -999.990 -999.990 1.607 ..P WKT 2011 02 23 09 54 55 31.3200 -97.3300 251.000 457.0 130.314 3.740 -999.990 -999.990 1.303 ..P WKT 2011 02 23 09 59 55 31.3200 -97.3300 251.000 30.0 162.345 3.880 -999.990 -999.990 1.623 ..P WKT 2011 02 23 10 04 55 31.3200 -97.3300 251.000 122.0 155.370 3.560 -999.990 -999.990 1.554 ..P WKT 2011 02 23 10 09 55 31.3200 -97.3300 251.000 457.0 130.921 3.700 -999.990 -999.990 1.309 ..P WKT 2011 02 23 10 19 55 31.3200 -97.3300 251.000 30.0 170.388 4.220 -999.990 -999.990 1.704 ..P WKT 2011 02 23 10 24 55 31.3200 -97.3300 251.000 122.0 150.962 4.480 -999.990 -999.990 1.510 ..P WKT 2011 02 23 10 29 55 31.3200 -97.3300 251.000 457.0 129.193 4.480 -999.990 -999.990 1.292 ..P WKT 2011 02 23 10 34 55 31.3200 -97.3300 251.000 30.0 174.932 4.450 -999.990 -999.990 1.749 ..P WKT 2011 02 23 10 39 55 31.3200 -97.3300 251.000 122.0 158.538 4.860 -999.990 -999.990 1.585 ..P WKT 2011 02 23 10 44 55 31.3200 -97.3300 251.000 457.0 125.028 4.200 -999.990 -999.990 1.250 ..P WKT 2011 02 23 10 54 55 31.3200 -97.3300 251.000 30.0 163.084 4.360 -999.990 -999.990 1.631 ..P WKT 2011 02 23 10 59 55 31.3200 -97.3300 251.000 122.0 151.736 5.260 -999.990 -999.990 1.517 ..P WKT 2011 02 23 11 04 55 31.3200 -97.3300 251.000 457.0 128.649 4.360 -999.990 -999.990 1.286 ..P WKT 2011 02 23 11 09 55 31.3200 -97.3300 251.000 30.0 158.905 3.640 -999.990 -999.990 1.589 ..P WKT 2011 02 23 11 14 55 31.3200 -97.3300 251.000 122.0 149.911 3.710 -999.990 -999.990 1.499 ..P WKT 2011 02 23 11 19 55 31.3200 -97.3300 251.000 457.0 129.854 3.660 -999.990 -999.990 1.299 ..P WKT 2011 02 23 11 29 55 31.3200 -97.3300 251.000 30.0 157.356 3.350 -999.990 -999.990 1.574 ..P WKT 2011 02 23 11 34 55 31.3200 -97.3300 251.000 122.0 148.922 3.440 -999.990 -999.990 1.489 ..P WKT 2011 02 23 11 39 55 31.3200 -97.3300 251.000 457.0 127.087 3.820 -999.990 -999.990 1.271 ..P WKT 2011 02 23 11 44 55 31.3200 -97.3300 251.000 30.0 159.871 3.430 -999.990 -999.990 1.599 ..P WKT 2011 02 23 11 49 55 31.3200 -97.3300 251.000 122.0 148.426 3.320 -999.990 -999.990 1.484 ..P WKT 2011 02 23 12 09 55 31.3200 -97.3300 251.000 457.0 123.368 4.320 -999.990 -999.990 1.234 ..P WKT 2011 02 23 12 10 25 31.3200 -97.3300 251.000 457.0 116.506 4.310 -999.990 -999.990 1.165 ..P WKT 2011 02 23 12 10 55 31.3200 -97.3300 251.000 457.0 122.535 4.280 -999.990 -999.990 1.225 ..P WKT 2011 02 23 12 11 25 31.3200 -97.3300 251.000 457.0 121.366 3.670 -999.990 -999.990 1.214 ..P WKT 2011 02 23 12 11 55 31.3200 -97.3300 251.000 457.0 120.866 3.630 -999.990 -999.990 1.209 ..P WKT 2011 02 23 12 12 25 31.3200 -97.3300 251.000 457.0 117.688 3.530 -999.990 -999.990 1.177 ..P WKT 2011 02 23 12 12 55 31.3200 -97.3300 251.000 457.0 120.535 4.990 -999.990 -999.990 1.205 ..P WKT 2011 02 23 12 13 25 31.3200 -97.3300 251.000 457.0 128.908 3.970 -999.990 -999.990 1.289 ..P WKT 2011 02 23 12 13 55 31.3200 -97.3300 251.000 457.0 123.386 3.720 -999.990 -999.990 1.234 ..P WKT 2011 02 23 12 14 25 31.3200 -97.3300 251.000 457.0 125.564 4.390 -999.990 -999.990 1.256 ..P WKT 2011 02 23 12 14 55 31.3200 -97.3300 251.000 457.0 119.708 3.930 -999.990 -999.990 1.197 ..P WKT 2011 02 23 12 19 55 31.3200 -97.3300 251.000 30.0 152.368 3.950 -999.990 -999.990 1.524 ..P WKT 2011 02 23 12 24 55 31.3200 -97.3300 251.000 122.0 142.013 3.660 -999.990 -999.990 1.420 ..P WKT 2011 02 23 12 29 55 31.3200 -97.3300 251.000 457.0 124.465 4.220 -999.990 -999.990 1.245 ..P WKT 2011 02 23 12 34 55 31.3200 -97.3300 251.000 30.0 176.521 4.210 -999.990 -999.990 1.765 ..P WKT 2011 02 23 12 39 55 31.3200 -97.3300 251.000 122.0 135.552 4.020 -999.990 -999.990 1.356 ..P WKT 2011 02 23 12 44 55 31.3200 -97.3300 251.000 457.0 127.879 3.300 -999.990 -999.990 1.279 ..P WKT 2011 02 23 12 54 55 31.3200 -97.3300 251.000 30.0 149.701 4.080 -999.990 -999.990 1.497 ..P WKT 2011 02 23 12 59 55 31.3200 -97.3300 251.000 122.0 143.736 5.030 -999.990 -999.990 1.437 ..P WKT 2011 02 23 13 04 55 31.3200 -97.3300 251.000 457.0 131.251 4.160 -999.990 -999.990 1.313 ..P WKT 2011 02 23 13 09 55 31.3200 -97.3300 251.000 30.0 155.048 4.840 -999.990 -999.990 1.550 ..P WKT 2011 02 23 13 14 55 31.3200 -97.3300 251.000 122.0 150.924 5.280 -999.990 -999.990 1.509 ..P WKT 2011 02 23 13 19 55 31.3200 -97.3300 251.000 457.0 127.745 5.620 -999.990 -999.990 1.277 ..P WKT 2011 02 23 13 29 55 31.3200 -97.3300 251.000 30.0 156.937 5.310 -999.990 -999.990 1.569 ..P WKT 2011 02 23 13 34 55 31.3200 -97.3300 251.000 122.0 153.482 5.310 -999.990 -999.990 1.535 ..P WKT 2011 02 23 13 39 55 31.3200 -97.3300 251.000 457.0 128.308 4.860 -999.990 -999.990 1.283 ..P WKT 2011 02 23 13 44 55 31.3200 -97.3300 251.000 30.0 161.277 4.880 -999.990 -999.990 1.613 ..P WKT 2011 02 23 13 49 55 31.3200 -97.3300 251.000 122.0 164.337 4.680 -999.990 -999.990 1.643 ..P WKT 2011 02 23 13 54 55 31.3200 -97.3300 251.000 457.0 128.814 3.930 -999.990 -999.990 1.288 ..P WKT 2011 02 23 14 04 55 31.3200 -97.3300 251.000 30.0 163.376 3.620 -999.990 -999.990 1.634 ..P WKT 2011 02 23 14 09 55 31.3200 -97.3300 251.000 122.0 156.631 5.300 -999.990 -999.990 1.566 ..P WKT 2011 02 23 14 14 55 31.3200 -97.3300 251.000 457.0 124.511 3.840 -999.990 -999.990 1.245 ..P WKT 2011 02 23 14 19 55 31.3200 -97.3300 251.000 30.0 161.843 8.200 -999.990 -999.990 1.618 ..P WKT 2011 02 23 14 24 55 31.3200 -97.3300 251.000 122.0 158.773 4.370 -999.990 -999.990 1.588 ..P WKT 2011 02 23 14 29 55 31.3200 -97.3300 251.000 457.0 121.989 5.040 -999.990 -999.990 1.220 ..P WKT 2011 02 23 14 39 55 31.3200 -97.3300 251.000 30.0 161.343 4.510 -999.990 -999.990 1.613 ..P WKT 2011 02 23 14 44 55 31.3200 -97.3300 251.000 122.0 156.701 4.830 -999.990 -999.990 1.567 ..P WKT 2011 02 23 14 49 55 31.3200 -97.3300 251.000 457.0 116.691 4.870 -999.990 -999.990 1.167 ..P WKT 2011 02 23 14 54 55 31.3200 -97.3300 251.000 30.0 175.111 4.760 -999.990 -999.990 1.751 ..P WKT 2011 02 23 14 59 55 31.3200 -97.3300 251.000 122.0 169.135 5.310 -999.990 -999.990 1.691 ..P WKT 2011 02 23 15 04 55 31.3200 -97.3300 251.000 457.0 123.800 5.210 -999.990 -999.990 1.238 ..P WKT 2011 02 23 15 14 55 31.3200 -97.3300 251.000 30.0 165.411 5.180 -999.990 -999.990 1.654 ..P WKT 2011 02 23 15 19 55 31.3200 -97.3300 251.000 122.0 160.963 5.010 -999.990 -999.990 1.610 ..P WKT 2011 02 23 15 24 55 31.3200 -97.3300 251.000 457.0 120.838 5.280 -999.990 -999.990 1.208 ..P WKT 2011 02 23 15 29 55 31.3200 -97.3300 251.000 30.0 162.403 4.720 -999.990 -999.990 1.624 ..P WKT 2011 02 23 15 34 55 31.3200 -97.3300 251.000 122.0 154.956 5.080 -999.990 -999.990 1.550 ..P WKT 2011 02 23 15 39 55 31.3200 -97.3300 251.000 457.0 118.512 4.220 -999.990 -999.990 1.185 ..P WKT 2011 02 23 15 49 55 31.3200 -97.3300 251.000 30.0 148.454 4.170 -999.990 -999.990 1.485 ..P WKT 2011 02 23 15 54 55 31.3200 -97.3300 251.000 122.0 146.177 4.380 -999.990 -999.990 1.462 ..P WKT 2011 02 23 15 59 55 31.3200 -97.3300 251.000 457.0 122.576 4.050 -999.990 -999.990 1.226 ..P WKT 2011 02 23 16 04 55 31.3200 -97.3300 251.000 30.0 148.619 4.240 -999.990 -999.990 1.486 ..P WKT 2011 02 23 16 09 55 31.3200 -97.3300 251.000 122.0 151.172 4.120 -999.990 -999.990 1.512 ..P WKT 2011 02 23 16 14 55 31.3200 -97.3300 251.000 457.0 127.079 3.460 -999.990 -999.990 1.271 ..P WKT 2011 02 23 16 24 55 31.3200 -97.3300 251.000 30.0 142.631 3.400 -999.990 -999.990 1.426 ..P WKT 2011 02 23 16 29 55 31.3200 -97.3300 251.000 122.0 144.137 3.680 -999.990 -999.990 1.441 ..P WKT 2011 02 23 16 34 55 31.3200 -97.3300 251.000 457.0 120.840 3.780 -999.990 -999.990 1.208 ..P WKT 2011 02 23 16 39 55 31.3200 -97.3300 251.000 30.0 141.822 3.870 -999.990 -999.990 1.418 ..P WKT 2011 02 23 16 44 55 31.3200 -97.3300 251.000 122.0 140.166 4.330 -999.990 -999.990 1.402 ..P WKT 2011 02 23 16 49 55 31.3200 -97.3300 251.000 457.0 123.700 4.020 -999.990 -999.990 1.237 ..P WKT 2011 02 23 17 04 55 31.3200 -97.3300 251.000 30.0 135.993 4.350 -999.990 -999.990 1.360 ..P WKT 2011 02 23 17 09 55 31.3200 -97.3300 251.000 122.0 136.893 4.070 -999.990 -999.990 1.369 ..P WKT 2011 02 23 17 14 55 31.3200 -97.3300 251.000 457.0 124.320 4.950 -999.990 -999.990 1.243 ..P WKT 2011 02 23 17 19 55 31.3200 -97.3300 251.000 30.0 131.373 3.950 -999.990 -999.990 1.314 ..P WKT 2011 02 23 17 24 55 31.3200 -97.3300 251.000 122.0 132.440 5.480 -999.990 -999.990 1.324 ..P WKT 2011 02 23 17 29 55 31.3200 -97.3300 251.000 457.0 116.048 3.860 -999.990 -999.990 1.160 ..P WKT 2011 02 23 17 39 55 31.3200 -97.3300 251.000 30.0 139.710 3.550 -999.990 -999.990 1.397 ..P WKT 2011 02 23 17 44 55 31.3200 -97.3300 251.000 122.0 142.188 3.700 -999.990 -999.990 1.422 ..P WKT 2011 02 23 17 49 55 31.3200 -97.3300 251.000 457.0 120.899 4.740 -999.990 -999.990 1.209 ..P WKT 2011 02 23 17 54 55 31.3200 -97.3300 251.000 30.0 140.494 5.210 -999.990 -999.990 1.405 ..P WKT 2011 02 23 17 59 55 31.3200 -97.3300 251.000 122.0 132.669 4.760 -999.990 -999.990 1.327 ..P WKT 2011 02 23 18 04 55 31.3200 -97.3300 251.000 457.0 132.654 3.920 -999.990 -999.990 1.327 ..P WKT 2011 02 23 18 14 55 31.3200 -97.3300 251.000 30.0 134.428 3.750 -999.990 -999.990 1.344 ..P WKT 2011 02 23 18 19 55 31.3200 -97.3300 251.000 122.0 129.906 4.630 -999.990 -999.990 1.299 ..P WKT 2011 02 23 18 24 55 31.3200 -97.3300 251.000 457.0 132.358 5.230 -999.990 -999.990 1.324 ..P WKT 2011 02 23 18 29 55 31.3200 -97.3300 251.000 30.0 129.497 4.700 -999.990 -999.990 1.295 ..P WKT 2011 02 23 18 34 55 31.3200 -97.3300 251.000 122.0 135.934 4.720 -999.990 -999.990 1.359 ..P WKT 2011 02 23 18 39 55 31.3200 -97.3300 251.000 457.0 120.787 4.390 -999.990 -999.990 1.208 ..P WKT 2011 02 23 18 49 55 31.3200 -97.3300 251.000 30.0 135.225 4.850 -999.990 -999.990 1.352 ..P WKT 2011 02 23 18 54 55 31.3200 -97.3300 251.000 122.0 129.946 4.390 -999.990 -999.990 1.299 ..P WKT 2011 02 23 18 59 55 31.3200 -97.3300 251.000 457.0 120.354 4.270 -999.990 -999.990 1.204 ..P WKT 2011 02 23 19 04 55 31.3200 -97.3300 251.000 30.0 129.017 4.890 -999.990 -999.990 1.290 ..P WKT 2011 02 23 19 09 55 31.3200 -97.3300 251.000 122.0 127.723 5.610 -999.990 -999.990 1.277 ..P WKT 2011 02 23 19 14 55 31.3200 -97.3300 251.000 457.0 117.801 4.830 -999.990 -999.990 1.178 ..P WKT 2011 02 23 19 24 55 31.3200 -97.3300 251.000 30.0 127.206 5.130 -999.990 -999.990 1.272 ..P WKT 2011 02 23 19 29 55 31.3200 -97.3300 251.000 122.0 125.628 4.660 -999.990 -999.990 1.256 ..P WKT 2011 02 23 19 34 55 31.3200 -97.3300 251.000 457.0 125.046 4.590 -999.990 -999.990 1.250 ..P WKT 2011 02 23 19 39 55 31.3200 -97.3300 251.000 30.0 133.086 4.350 -999.990 -999.990 1.331 ..P WKT 2011 02 23 19 44 55 31.3200 -97.3300 251.000 122.0 133.829 4.350 -999.990 -999.990 1.338 ..P WKT 2011 02 23 19 49 55 31.3200 -97.3300 251.000 457.0 122.304 4.120 -999.990 -999.990 1.223 ..P WKT 2011 02 23 19 59 55 31.3200 -97.3300 251.000 30.0 132.245 3.960 -999.990 -999.990 1.322 ..P WKT 2011 02 23 20 04 55 31.3200 -97.3300 251.000 122.0 133.320 5.040 -999.990 -999.990 1.333 ..P WKT 2011 02 23 20 09 55 31.3200 -97.3300 251.000 457.0 119.645 4.080 -999.990 -999.990 1.196 ..P WKT 2011 02 23 20 14 55 31.3200 -97.3300 251.000 30.0 142.758 4.190 -999.990 -999.990 1.428 ..P WKT 2011 02 23 20 19 55 31.3200 -97.3300 251.000 122.0 164.541 4.460 -999.990 -999.990 1.645 ..P WKT 2011 02 23 20 24 55 31.3200 -97.3300 251.000 457.0 129.001 4.150 -999.990 -999.990 1.290 ..P WKT 2011 02 23 20 34 55 31.3200 -97.3300 251.000 30.0 128.049 4.330 -999.990 -999.990 1.280 ..P WKT 2011 02 23 20 39 55 31.3200 -97.3300 251.000 122.0 128.508 4.960 -999.990 -999.990 1.285 ..P WKT 2011 02 23 20 44 55 31.3200 -97.3300 251.000 457.0 124.827 4.080 -999.990 -999.990 1.248 ..P WKT 2011 02 23 20 49 55 31.3200 -97.3300 251.000 30.0 123.465 3.940 -999.990 -999.990 1.235 ..P WKT 2011 02 23 20 54 55 31.3200 -97.3300 251.000 122.0 132.534 3.970 -999.990 -999.990 1.325 ..P WKT 2011 02 23 20 59 55 31.3200 -97.3300 251.000 457.0 128.356 4.070 -999.990 -999.990 1.284 ..P WKT 2011 02 23 21 09 55 31.3200 -97.3300 251.000 30.0 121.826 4.180 -999.990 -999.990 1.218 ..P WKT 2011 02 23 21 14 55 31.3200 -97.3300 251.000 122.0 130.560 8.440 -999.990 -999.990 1.306 ..P WKT 2011 02 23 21 19 55 31.3200 -97.3300 251.000 457.0 123.241 4.010 -999.990 -999.990 1.232 ..P WKT 2011 02 23 21 24 55 31.3200 -97.3300 251.000 30.0 123.866 3.510 -999.990 -999.990 1.239 ..P WKT 2011 02 23 21 29 55 31.3200 -97.3300 251.000 122.0 125.482 4.230 -999.990 -999.990 1.255 ..P WKT 2011 02 23 21 34 55 31.3200 -97.3300 251.000 457.0 122.302 4.270 -999.990 -999.990 1.223 ..P WKT 2011 02 23 21 44 55 31.3200 -97.3300 251.000 30.0 125.228 3.910 -999.990 -999.990 1.252 ..P WKT 2011 02 23 21 49 55 31.3200 -97.3300 251.000 122.0 126.041 3.540 -999.990 -999.990 1.260 ..P WKT 2011 02 23 21 54 55 31.3200 -97.3300 251.000 457.0 120.406 3.520 -999.990 -999.990 1.204 ..P WKT 2011 02 23 21 59 55 31.3200 -97.3300 251.000 30.0 125.517 3.850 -999.990 -999.990 1.255 ..P WKT 2011 02 23 22 04 55 31.3200 -97.3300 251.000 122.0 123.685 3.630 -999.990 -999.990 1.237 ..P WKT 2011 02 23 22 09 55 31.3200 -97.3300 251.000 457.0 118.216 3.170 -999.990 -999.990 1.182 ..P WKT 2011 02 23 22 19 55 31.3200 -97.3300 251.000 30.0 117.080 3.820 -999.990 -999.990 1.171 ..P WKT 2011 02 23 22 24 55 31.3200 -97.3300 251.000 122.0 118.106 4.150 -999.990 -999.990 1.181 ..P WKT 2011 02 23 22 29 55 31.3200 -97.3300 251.000 457.0 117.809 4.050 -999.990 -999.990 1.178 ..P WKT 2011 02 23 22 34 55 31.3200 -97.3300 251.000 30.0 121.148 3.760 -999.990 -999.990 1.211 ..P WKT 2011 02 23 22 39 55 31.3200 -97.3300 251.000 122.0 123.494 3.860 -999.990 -999.990 1.235 ..P WKT 2011 02 23 22 44 55 31.3200 -97.3300 251.000 457.0 122.206 3.650 -999.990 -999.990 1.222 ..P WKT 2011 02 23 22 54 55 31.3200 -97.3300 251.000 30.0 124.963 3.710 -999.990 -999.990 1.250 ..P WKT 2011 02 23 22 59 55 31.3200 -97.3300 251.000 122.0 126.364 3.550 -999.990 -999.990 1.264 ..P WKT 2011 02 23 23 04 55 31.3200 -97.3300 251.000 457.0 120.830 3.350 -999.990 -999.990 1.208 ..P WKT 2011 02 23 23 09 55 31.3200 -97.3300 251.000 30.0 121.572 3.320 -999.990 -999.990 1.216 ..P WKT 2011 02 23 23 14 55 31.3200 -97.3300 251.000 122.0 134.199 3.620 -999.990 -999.990 1.342 ..P WKT 2011 02 23 23 19 55 31.3200 -97.3300 251.000 457.0 113.811 3.480 -999.990 -999.990 1.138 ..P WKT 2011 02 23 23 29 55 31.3200 -97.3300 251.000 30.0 123.843 3.350 -999.990 -999.990 1.238 ..P WKT 2011 02 23 23 34 55 31.3200 -97.3300 251.000 122.0 124.551 3.590 -999.990 -999.990 1.246 ..P WKT 2011 02 23 23 39 55 31.3200 -97.3300 251.000 457.0 116.350 3.630 -999.990 -999.990 1.163 ..P WKT 2011 02 23 23 44 55 31.3200 -97.3300 251.000 30.0 127.947 3.720 -999.990 -999.990 1.279 ..P WKT 2011 02 23 23 49 55 31.3200 -97.3300 251.000 122.0 120.736 3.600 -999.990 -999.990 1.207 ..P WKT 2011 02 24 00 09 55 31.3200 -97.3300 251.000 457.0 116.124 4.790 -999.990 -999.990 1.161 ..P WKT 2011 02 24 00 10 25 31.3200 -97.3300 251.000 457.0 116.336 4.410 -999.990 -999.990 1.163 ..P WKT 2011 02 24 00 10 55 31.3200 -97.3300 251.000 457.0 117.538 4.700 -999.990 -999.990 1.175 ..P WKT 2011 02 24 00 11 25 31.3200 -97.3300 251.000 457.0 121.710 4.240 -999.990 -999.990 1.217 ..P WKT 2011 02 24 00 11 55 31.3200 -97.3300 251.000 457.0 116.809 4.180 -999.990 -999.990 1.168 ..P WKT 2011 02 24 00 12 25 31.3200 -97.3300 251.000 457.0 114.052 4.090 -999.990 -999.990 1.141 ..P WKT 2011 02 24 00 12 55 31.3200 -97.3300 251.000 457.0 117.399 4.020 -999.990 -999.990 1.174 ..P WKT 2011 02 24 00 13 25 31.3200 -97.3300 251.000 457.0 114.972 4.350 -999.990 -999.990 1.150 ..P WKT 2011 02 24 00 13 55 31.3200 -97.3300 251.000 457.0 118.649 4.600 -999.990 -999.990 1.186 ..P WKT 2011 02 24 00 14 25 31.3200 -97.3300 251.000 457.0 117.377 4.340 -999.990 -999.990 1.174 ..P WKT 2011 02 24 00 14 55 31.3200 -97.3300 251.000 457.0 115.939 5.230 -999.990 -999.990 1.159 ..P WKT 2011 02 24 00 19 55 31.3200 -97.3300 251.000 30.0 128.956 5.830 -999.990 -999.990 1.290 ..P WKT 2011 02 24 00 24 55 31.3200 -97.3300 251.000 122.0 127.454 3.990 -999.990 -999.990 1.275 ..P WKT 2011 02 24 00 29 55 31.3200 -97.3300 251.000 457.0 114.563 4.560 -999.990 -999.990 1.146 ..P WKT 2011 02 24 00 34 55 31.3200 -97.3300 251.000 30.0 128.080 4.000 -999.990 -999.990 1.281 ..P WKT 2011 02 24 00 39 55 31.3200 -97.3300 251.000 122.0 122.614 4.460 -999.990 -999.990 1.226 ..P WKT 2011 02 24 00 44 55 31.3200 -97.3300 251.000 457.0 123.587 6.460 -999.990 -999.990 1.236 ..P WKT 2011 02 24 00 54 55 31.3200 -97.3300 251.000 30.0 120.143 3.840 -999.990 -999.990 1.201 ..P WKT 2011 02 24 00 59 55 31.3200 -97.3300 251.000 122.0 124.480 4.180 -999.990 -999.990 1.245 ..P WKT 2011 02 24 01 04 55 31.3200 -97.3300 251.000 457.0 131.130 4.250 -999.990 -999.990 1.311 ..P WKT 2011 02 24 01 09 55 31.3200 -97.3300 251.000 30.0 123.243 4.990 -999.990 -999.990 1.232 ..P WKT 2011 02 24 01 14 55 31.3200 -97.3300 251.000 122.0 129.729 3.950 -999.990 -999.990 1.297 ..P WKT 2011 02 24 01 19 55 31.3200 -97.3300 251.000 457.0 124.154 4.690 -999.990 -999.990 1.242 ..P WKT 2011 02 24 01 29 55 31.3200 -97.3300 251.000 30.0 126.340 4.030 -999.990 -999.990 1.263 ..P WKT 2011 02 24 01 34 55 31.3200 -97.3300 251.000 122.0 110.962 3.500 -999.990 -999.990 1.110 ..P WKT 2011 02 24 01 39 55 31.3200 -97.3300 251.000 457.0 112.278 4.190 -999.990 -999.990 1.123 ..P WKT 2011 02 24 01 44 55 31.3200 -97.3300 251.000 30.0 127.815 3.580 -999.990 -999.990 1.278 ..P WKT 2011 02 24 01 49 55 31.3200 -97.3300 251.000 122.0 118.881 4.200 -999.990 -999.990 1.189 ..P WKT 2011 02 24 01 54 55 31.3200 -97.3300 251.000 457.0 108.786 3.970 -999.990 -999.990 1.088 ..P WKT 2011 02 24 02 04 55 31.3200 -97.3300 251.000 30.0 116.288 3.930 -999.990 -999.990 1.163 ..P WKT 2011 02 24 02 09 55 31.3200 -97.3300 251.000 122.0 117.346 3.800 -999.990 -999.990 1.173 ..P WKT 2011 02 24 02 14 55 31.3200 -97.3300 251.000 457.0 105.498 4.340 -999.990 -999.990 1.055 ..P WKT 2011 02 24 02 19 55 31.3200 -97.3300 251.000 30.0 184.007 6.480 -999.990 -999.990 1.840 ..P WKT 2011 02 24 02 24 55 31.3200 -97.3300 251.000 122.0 128.467 4.110 -999.990 -999.990 1.285 ..P WKT 2011 02 24 02 29 55 31.3200 -97.3300 251.000 457.0 109.662 3.630 -999.990 -999.990 1.097 ..P WKT 2011 02 24 02 39 55 31.3200 -97.3300 251.000 30.0 141.819 4.440 -999.990 -999.990 1.418 ..P WKT 2011 02 24 02 44 55 31.3200 -97.3300 251.000 122.0 124.239 3.790 -999.990 -999.990 1.242 ..P WKT 2011 02 24 02 49 55 31.3200 -97.3300 251.000 457.0 108.642 6.300 -999.990 -999.990 1.086 ..P WKT 2011 02 24 02 54 55 31.3200 -97.3300 251.000 30.0 132.133 4.580 -999.990 -999.990 1.321 ..P WKT 2011 02 24 02 59 55 31.3200 -97.3300 251.000 122.0 119.846 3.620 -999.990 -999.990 1.198 ..P WKT 2011 02 24 03 04 55 31.3200 -97.3300 251.000 457.0 106.562 4.730 -999.990 -999.990 1.066 ..P WKT 2011 02 24 03 14 55 31.3200 -97.3300 251.000 30.0 127.194 3.220 -999.990 -999.990 1.272 ..P WKT 2011 02 24 03 19 55 31.3200 -97.3300 251.000 122.0 115.043 3.120 -999.990 -999.990 1.150 ..P WKT 2011 02 24 03 24 55 31.3200 -97.3300 251.000 457.0 107.529 4.330 -999.990 -999.990 1.075 ..P WKT 2011 02 24 03 29 55 31.3200 -97.3300 251.000 30.0 116.594 4.330 -999.990 -999.990 1.166 ..P WKT 2011 02 24 03 34 55 31.3200 -97.3300 251.000 122.0 112.064 3.710 -999.990 -999.990 1.121 ..P WKT 2011 02 24 03 39 55 31.3200 -97.3300 251.000 457.0 108.197 3.610 -999.990 -999.990 1.082 ..P WKT 2011 02 24 03 49 55 31.3200 -97.3300 251.000 30.0 112.757 4.380 -999.990 -999.990 1.128 ..P WKT 2011 02 24 03 54 55 31.3200 -97.3300 251.000 122.0 110.404 4.280 -999.990 -999.990 1.104 ..P WKT 2011 02 24 03 59 55 31.3200 -97.3300 251.000 457.0 110.539 4.800 -999.990 -999.990 1.105 ..P WKT 2011 02 24 04 04 55 31.3200 -97.3300 251.000 30.0 112.832 4.410 -999.990 -999.990 1.128 ..P WKT 2011 02 24 04 09 55 31.3200 -97.3300 251.000 122.0 121.764 4.680 -999.990 -999.990 1.218 ..P WKT 2011 02 24 04 14 55 31.3200 -97.3300 251.000 457.0 121.238 5.060 -999.990 -999.990 1.212 ..P WKT 2011 02 24 04 24 55 31.3200 -97.3300 251.000 30.0 123.029 4.780 -999.990 -999.990 1.230 ..P WKT 2011 02 24 04 29 55 31.3200 -97.3300 251.000 122.0 146.768 5.370 -999.990 -999.990 1.468 ..P WKT 2011 02 24 04 34 55 31.3200 -97.3300 251.000 457.0 120.861 4.750 -999.990 -999.990 1.209 ..P WKT 2011 02 24 04 39 55 31.3200 -97.3300 251.000 30.0 124.011 4.760 -999.990 -999.990 1.240 ..P WKT 2011 02 24 04 44 55 31.3200 -97.3300 251.000 122.0 146.929 4.440 -999.990 -999.990 1.469 ..P WKT 2011 02 24 04 49 55 31.3200 -97.3300 251.000 457.0 106.891 3.740 -999.990 -999.990 1.069 ..P WKT 2011 02 24 05 04 55 31.3200 -97.3300 251.000 30.0 126.902 4.020 -999.990 -999.990 1.269 ..P WKT 2011 02 24 05 09 55 31.3200 -97.3300 251.000 122.0 112.315 5.350 -999.990 -999.990 1.123 ..P WKT 2011 02 24 05 14 55 31.3200 -97.3300 251.000 457.0 104.042 4.250 -999.990 -999.990 1.040 ..P WKT 2011 02 24 05 19 55 31.3200 -97.3300 251.000 30.0 111.062 4.790 -999.990 -999.990 1.111 ..P WKT 2011 02 24 05 24 55 31.3200 -97.3300 251.000 122.0 106.611 4.630 -999.990 -999.990 1.066 ..P WKT 2011 02 24 05 29 55 31.3200 -97.3300 251.000 457.0 106.649 6.720 -999.990 -999.990 1.066 ..P WKT 2011 02 24 05 39 55 31.3200 -97.3300 251.000 30.0 110.790 4.760 -999.990 -999.990 1.108 ..P WKT 2011 02 24 05 44 55 31.3200 -97.3300 251.000 122.0 109.239 4.260 -999.990 -999.990 1.092 ..P WKT 2011 02 24 05 49 55 31.3200 -97.3300 251.000 457.0 103.694 4.120 -999.990 -999.990 1.037 ..P WKT 2011 02 24 05 54 55 31.3200 -97.3300 251.000 30.0 103.972 4.750 -999.990 -999.990 1.040 ..P WKT 2011 02 24 05 59 55 31.3200 -97.3300 251.000 122.0 101.588 3.900 -999.990 -999.990 1.016 ..P WKT 2011 02 24 06 04 55 31.3200 -97.3300 251.000 457.0 99.535 3.580 -999.990 -999.990 0.995 ..P WKT 2011 02 24 06 14 55 31.3200 -97.3300 251.000 30.0 107.486 3.700 -999.990 -999.990 1.075 ..P WKT 2011 02 24 06 19 55 31.3200 -97.3300 251.000 122.0 108.170 4.120 -999.990 -999.990 1.082 ..P WKT 2011 02 24 06 24 55 31.3200 -97.3300 251.000 457.0 94.865 4.400 -999.990 -999.990 0.949 ..P WKT 2011 02 24 06 29 55 31.3200 -97.3300 251.000 30.0 106.205 4.070 -999.990 -999.990 1.062 ..P WKT 2011 02 24 06 34 55 31.3200 -97.3300 251.000 122.0 107.221 4.470 -999.990 -999.990 1.072 ..P WKT 2011 02 24 06 39 55 31.3200 -97.3300 251.000 457.0 106.238 4.540 -999.990 -999.990 1.062 ..P WKT 2011 02 24 06 49 55 31.3200 -97.3300 251.000 30.0 105.653 4.860 -999.990 -999.990 1.057 ..P WKT 2011 02 24 06 54 55 31.3200 -97.3300 251.000 122.0 103.051 4.530 -999.990 -999.990 1.031 ..P WKT 2011 02 24 06 59 55 31.3200 -97.3300 251.000 457.0 105.448 5.100 -999.990 -999.990 1.054 ..P WKT 2011 02 24 07 04 55 31.3200 -97.3300 251.000 30.0 102.179 4.480 -999.990 -999.990 1.022 ..P WKT 2011 02 24 07 09 55 31.3200 -97.3300 251.000 122.0 110.578 4.080 -999.990 -999.990 1.106 ..P WKT 2011 02 24 07 14 55 31.3200 -97.3300 251.000 457.0 99.305 3.750 -999.990 -999.990 0.993 ..P WKT 2011 02 24 07 24 55 31.3200 -97.3300 251.000 30.0 99.766 3.700 -999.990 -999.990 0.998 ..P WKT 2011 02 24 07 29 55 31.3200 -97.3300 251.000 122.0 106.835 3.770 -999.990 -999.990 1.068 ..P WKT 2011 02 24 07 34 55 31.3200 -97.3300 251.000 457.0 105.565 3.570 -999.990 -999.990 1.056 ..P WKT 2011 02 24 07 39 55 31.3200 -97.3300 251.000 30.0 118.643 4.550 -999.990 -999.990 1.186 ..P WKT 2011 02 24 07 44 55 31.3200 -97.3300 251.000 122.0 121.546 5.590 -999.990 -999.990 1.215 ..P WKT 2011 02 24 07 49 55 31.3200 -97.3300 251.000 457.0 102.588 3.280 -999.990 -999.990 1.026 ..P WKT 2011 02 24 07 59 55 31.3200 -97.3300 251.000 30.0 112.183 3.820 -999.990 -999.990 1.122 ..P WKT 2011 02 24 08 04 55 31.3200 -97.3300 251.000 122.0 118.544 3.660 -999.990 -999.990 1.185 ..P WKT 2011 02 24 08 09 55 31.3200 -97.3300 251.000 457.0 109.212 3.990 -999.990 -999.990 1.092 ..P WKT 2011 02 24 08 14 55 31.3200 -97.3300 251.000 30.0 116.243 4.710 -999.990 -999.990 1.162 ..P WKT 2011 02 24 08 19 55 31.3200 -97.3300 251.000 122.0 110.583 3.910 -999.990 -999.990 1.106 ..P WKT 2011 02 24 08 24 55 31.3200 -97.3300 251.000 457.0 110.099 3.290 -999.990 -999.990 1.101 ..P WKT 2011 02 24 08 34 55 31.3200 -97.3300 251.000 30.0 112.186 3.510 -999.990 -999.990 1.122 ..P WKT 2011 02 24 08 39 55 31.3200 -97.3300 251.000 122.0 114.925 4.100 -999.990 -999.990 1.149 ..P WKT 2011 02 24 08 44 55 31.3200 -97.3300 251.000 457.0 109.476 4.310 -999.990 -999.990 1.095 ..P WKT 2011 02 24 08 49 55 31.3200 -97.3300 251.000 30.0 106.031 4.600 -999.990 -999.990 1.060 ..P WKT 2011 02 24 08 54 55 31.3200 -97.3300 251.000 122.0 114.956 3.990 -999.990 -999.990 1.150 ..P WKT 2011 02 24 08 59 55 31.3200 -97.3300 251.000 457.0 108.334 4.140 -999.990 -999.990 1.083 ..P WKT 2011 02 24 09 09 55 31.3200 -97.3300 251.000 30.0 106.147 3.890 -999.990 -999.990 1.061 ..P WKT 2011 02 24 09 14 55 31.3200 -97.3300 251.000 122.0 117.775 4.290 -999.990 -999.990 1.178 ..P WKT 2011 02 24 09 19 55 31.3200 -97.3300 251.000 457.0 111.342 4.920 -999.990 -999.990 1.113 ..P WKT 2011 02 24 09 24 55 31.3200 -97.3300 251.000 30.0 111.598 4.420 -999.990 -999.990 1.116 ..P WKT 2011 02 24 09 29 55 31.3200 -97.3300 251.000 122.0 111.185 3.850 -999.990 -999.990 1.112 ..P WKT 2011 02 24 09 34 55 31.3200 -97.3300 251.000 457.0 110.103 4.180 -999.990 -999.990 1.101 ..P WKT 2011 02 24 09 44 55 31.3200 -97.3300 251.000 30.0 112.266 4.780 -999.990 -999.990 1.123 ..P WKT 2011 02 24 09 49 55 31.3200 -97.3300 251.000 122.0 113.336 3.920 -999.990 -999.990 1.133 ..P WKT 2011 02 24 09 54 55 31.3200 -97.3300 251.000 457.0 113.066 4.500 -999.990 -999.990 1.131 ..P WKT 2011 02 24 09 59 55 31.3200 -97.3300 251.000 30.0 112.462 4.010 -999.990 -999.990 1.125 ..P WKT 2011 02 24 10 04 55 31.3200 -97.3300 251.000 122.0 112.192 3.480 -999.990 -999.990 1.122 ..P WKT 2011 02 24 10 09 55 31.3200 -97.3300 251.000 457.0 108.574 3.670 -999.990 -999.990 1.086 ..P WKT 2011 02 24 10 19 55 31.3200 -97.3300 251.000 30.0 106.549 3.220 -999.990 -999.990 1.065 ..P WKT 2011 02 24 10 24 55 31.3200 -97.3300 251.000 122.0 110.827 3.820 -999.990 -999.990 1.108 ..P WKT 2011 02 24 10 29 55 31.3200 -97.3300 251.000 457.0 108.403 3.540 -999.990 -999.990 1.084 ..P WKT 2011 02 24 10 34 55 31.3200 -97.3300 251.000 30.0 105.978 3.530 -999.990 -999.990 1.060 ..P WKT 2011 02 24 10 39 55 31.3200 -97.3300 251.000 122.0 110.257 3.840 -999.990 -999.990 1.103 ..P WKT 2011 02 24 10 44 55 31.3200 -97.3300 251.000 457.0 107.162 3.600 -999.990 -999.990 1.072 ..P WKT 2011 02 24 10 54 55 31.3200 -97.3300 251.000 30.0 107.770 3.770 -999.990 -999.990 1.078 ..P WKT 2011 02 24 10 59 55 31.3200 -97.3300 251.000 122.0 109.464 4.090 -999.990 -999.990 1.095 ..P WKT 2011 02 24 11 04 55 31.3200 -97.3300 251.000 457.0 105.792 3.390 -999.990 -999.990 1.058 ..P WKT 2011 02 24 11 09 55 31.3200 -97.3300 251.000 30.0 108.492 4.250 -999.990 -999.990 1.085 ..P WKT 2011 02 24 11 14 55 31.3200 -97.3300 251.000 122.0 116.226 3.740 -999.990 -999.990 1.162 ..P WKT 2011 02 24 11 19 55 31.3200 -97.3300 251.000 457.0 110.540 3.030 -999.990 -999.990 1.105 ..P WKT 2011 02 24 11 29 55 31.3200 -97.3300 251.000 30.0 107.134 4.360 -999.990 -999.990 1.071 ..P WKT 2011 02 24 11 34 55 31.3200 -97.3300 251.000 122.0 113.110 3.670 -999.990 -999.990 1.131 ..P WKT 2011 02 24 11 39 55 31.3200 -97.3300 251.000 457.0 112.372 4.490 -999.990 -999.990 1.124 ..P WKT 2011 02 24 11 44 55 31.3200 -97.3300 251.000 30.0 112.306 3.840 -999.990 -999.990 1.123 ..P WKT 2011 02 24 11 49 55 31.3200 -97.3300 251.000 122.0 108.714 4.130 -999.990 -999.990 1.087 ..P WKT 2011 02 24 12 09 55 31.3200 -97.3300 251.000 457.0 108.700 4.270 -999.990 -999.990 1.087 ..P WKT 2011 02 24 12 10 25 31.3200 -97.3300 251.000 457.0 104.205 4.360 -999.990 -999.990 1.042 ..P WKT 2011 02 24 12 10 55 31.3200 -97.3300 251.000 457.0 112.303 5.950 -999.990 -999.990 1.123 ..P WKT 2011 02 24 12 11 25 31.3200 -97.3300 251.000 457.0 110.160 4.710 -999.990 -999.990 1.102 ..P WKT 2011 02 24 12 11 55 31.3200 -97.3300 251.000 457.0 110.534 4.060 -999.990 -999.990 1.105 ..P WKT 2011 02 24 12 12 25 31.3200 -97.3300 251.000 457.0 118.464 5.370 -999.990 -999.990 1.185 ..P WKT 2011 02 24 12 12 55 31.3200 -97.3300 251.000 457.0 115.984 5.590 -999.990 -999.990 1.160 ..P WKT 2011 02 24 12 13 25 31.3200 -97.3300 251.000 457.0 111.992 4.230 -999.990 -999.990 1.120 ..P WKT 2011 02 24 12 13 55 31.3200 -97.3300 251.000 457.0 110.184 4.450 -999.990 -999.990 1.102 ..P WKT 2011 02 24 12 14 25 31.3200 -97.3300 251.000 457.0 108.376 4.160 -999.990 -999.990 1.084 ..P WKT 2011 02 24 12 14 55 31.3200 -97.3300 251.000 457.0 110.093 4.200 -999.990 -999.990 1.101 ..P WKT 2011 02 24 12 19 55 31.3200 -97.3300 251.000 30.0 106.618 4.270 -999.990 -999.990 1.066 ..P WKT 2011 02 24 12 24 55 31.3200 -97.3300 251.000 122.0 114.893 4.180 -999.990 -999.990 1.149 ..P WKT 2011 02 24 12 29 55 31.3200 -97.3300 251.000 457.0 115.615 3.980 -999.990 -999.990 1.156 ..P WKT 2011 02 24 12 34 55 31.3200 -97.3300 251.000 30.0 110.965 4.500 -999.990 -999.990 1.110 ..P WKT 2011 02 24 12 39 55 31.3200 -97.3300 251.000 122.0 115.882 3.730 -999.990 -999.990 1.159 ..P WKT 2011 02 24 12 44 55 31.3200 -97.3300 251.000 457.0 113.413 4.220 -999.990 -999.990 1.134 ..P WKT 2011 02 24 12 54 55 31.3200 -97.3300 251.000 30.0 118.155 3.890 -999.990 -999.990 1.182 ..P WKT 2011 02 24 12 59 55 31.3200 -97.3300 251.000 122.0 122.846 5.320 -999.990 -999.990 1.228 ..P WKT 2011 02 24 13 04 55 31.3200 -97.3300 251.000 457.0 116.463 3.930 -999.990 -999.990 1.165 ..P WKT 2011 02 24 13 09 55 31.3200 -97.3300 251.000 30.0 115.786 4.200 -999.990 -999.990 1.158 ..P WKT 2011 02 24 13 14 55 31.3200 -97.3300 251.000 122.0 118.127 4.050 -999.990 -999.990 1.181 ..P WKT 2011 02 24 13 19 55 31.3200 -97.3300 251.000 457.0 109.566 3.350 -999.990 -999.990 1.096 ..P WKT 2011 02 24 13 29 55 31.3200 -97.3300 251.000 30.0 113.914 4.040 -999.990 -999.990 1.139 ..P WKT 2011 02 24 13 34 55 31.3200 -97.3300 251.000 122.0 113.907 3.220 -999.990 -999.990 1.139 ..P WKT 2011 02 24 13 39 55 31.3200 -97.3300 251.000 457.0 114.907 3.040 -999.990 -999.990 1.149 ..P WKT 2011 02 24 13 44 55 31.3200 -97.3300 251.000 30.0 112.219 3.100 -999.990 -999.990 1.122 ..P WKT 2011 02 24 13 49 55 31.3200 -97.3300 251.000 122.0 115.230 4.150 -999.990 -999.990 1.152 ..P WKT 2011 02 24 13 54 55 31.3200 -97.3300 251.000 457.0 112.541 3.040 -999.990 -999.990 1.125 ..P WKT 2011 02 24 14 04 55 31.3200 -97.3300 251.000 30.0 112.097 3.520 -999.990 -999.990 1.121 ..P WKT 2011 02 24 14 09 55 31.3200 -97.3300 251.000 122.0 119.034 3.130 -999.990 -999.990 1.190 ..P WKT 2011 02 24 14 14 55 31.3200 -97.3300 251.000 457.0 108.541 3.430 -999.990 -999.990 1.085 ..P WKT 2011 02 24 14 19 55 31.3200 -97.3300 251.000 30.0 117.153 3.550 -999.990 -999.990 1.172 ..P WKT 2011 02 24 14 24 55 31.3200 -97.3300 251.000 122.0 116.715 4.370 -999.990 -999.990 1.167 ..P WKT 2011 02 24 14 29 55 31.3200 -97.3300 251.000 457.0 110.247 4.670 -999.990 -999.990 1.102 ..P WKT 2011 02 24 14 39 55 31.3200 -97.3300 251.000 30.0 116.792 5.780 -999.990 -999.990 1.168 ..P WKT 2011 02 24 14 44 55 31.3200 -97.3300 251.000 122.0 112.047 4.710 -999.990 -999.990 1.120 ..P WKT 2011 02 24 14 49 55 31.3200 -97.3300 251.000 457.0 109.984 5.060 -999.990 -999.990 1.100 ..P WKT 2011 02 24 14 54 55 31.3200 -97.3300 251.000 30.0 116.628 3.920 -999.990 -999.990 1.166 ..P WKT 2011 02 24 14 59 55 31.3200 -97.3300 251.000 122.0 109.541 3.750 -999.990 -999.990 1.095 ..P WKT 2011 02 24 15 04 55 31.3200 -97.3300 251.000 457.0 110.156 4.250 -999.990 -999.990 1.102 ..P WKT 2011 02 24 15 14 55 31.3200 -97.3300 251.000 30.0 112.417 3.630 -999.990 -999.990 1.124 ..P WKT 2011 02 24 15 19 55 31.3200 -97.3300 251.000 122.0 111.717 3.720 -999.990 -999.990 1.117 ..P WKT 2011 02 24 15 24 55 31.3200 -97.3300 251.000 457.0 99.300 4.770 -999.990 -999.990 0.993 ..P WKT 2011 02 24 15 29 55 31.3200 -97.3300 251.000 30.0 109.982 4.720 -999.990 -999.990 1.100 ..P WKT 2011 02 24 15 34 55 31.3200 -97.3300 251.000 122.0 106.940 3.880 -999.990 -999.990 1.069 ..P WKT 2011 02 24 15 39 55 31.3200 -97.3300 251.000 457.0 99.547 6.800 -999.990 -999.990 0.995 ..P WKT 2011 02 24 15 49 55 31.3200 -97.3300 251.000 30.0 108.214 4.410 -999.990 -999.990 1.082 ..P WKT 2011 02 24 15 54 55 31.3200 -97.3300 251.000 122.0 115.402 4.490 -999.990 -999.990 1.154 ..P WKT 2011 02 24 15 59 55 31.3200 -97.3300 251.000 457.0 112.886 3.960 -999.990 -999.990 1.129 ..P WKT 2011 02 24 16 04 55 31.3200 -97.3300 251.000 30.0 115.723 4.680 -999.990 -999.990 1.157 ..P WKT 2011 02 24 16 09 55 31.3200 -97.3300 251.000 122.0 117.222 4.930 -999.990 -999.990 1.172 ..P WKT 2011 02 24 16 14 55 31.3200 -97.3300 251.000 457.0 107.849 4.820 -999.990 -999.990 1.078 ..P WKT 2011 02 24 16 24 55 31.3200 -97.3300 251.000 30.0 114.670 3.840 -999.990 -999.990 1.147 ..P WKT 2011 02 24 16 29 55 31.3200 -97.3300 251.000 122.0 119.488 3.930 -999.990 -999.990 1.195 ..P WKT 2011 02 24 16 34 55 31.3200 -97.3300 251.000 457.0 110.597 3.860 -999.990 -999.990 1.106 ..P WKT 2011 02 24 16 39 55 31.3200 -97.3300 251.000 30.0 111.904 5.380 -999.990 -999.990 1.119 ..P WKT 2011 02 24 16 44 55 31.3200 -97.3300 251.000 122.0 110.035 3.880 -999.990 -999.990 1.100 ..P WKT 2011 02 24 16 49 55 31.3200 -97.3300 251.000 457.0 116.022 3.670 -999.990 -999.990 1.160 ..P WKT 2011 02 24 17 04 55 31.3200 -97.3300 251.000 30.0 114.558 3.870 -999.990 -999.990 1.146 ..P WKT 2011 02 24 17 09 55 31.3200 -97.3300 251.000 122.0 115.178 3.240 -999.990 -999.990 1.152 ..P WKT 2011 02 24 17 14 55 31.3200 -97.3300 251.000 457.0 119.141 3.690 -999.990 -999.990 1.191 ..P WKT 2011 02 24 17 19 55 31.3200 -97.3300 251.000 30.0 115.751 3.220 -999.990 -999.990 1.158 ..P WKT 2011 02 24 17 24 55 31.3200 -97.3300 251.000 122.0 119.043 3.940 -999.990 -999.990 1.190 ..P WKT 2011 02 24 17 29 55 31.3200 -97.3300 251.000 457.0 121.834 3.450 -999.990 -999.990 1.218 ..P WKT 2011 02 24 17 39 55 31.3200 -97.3300 251.000 30.0 114.071 3.350 -999.990 -999.990 1.141 ..P WKT 2011 02 24 17 44 55 31.3200 -97.3300 251.000 122.0 118.551 3.890 -999.990 -999.990 1.186 ..P WKT 2011 02 24 17 49 55 31.3200 -97.3300 251.000 457.0 122.694 3.390 -999.990 -999.990 1.227 ..P WKT 2011 02 24 17 54 55 31.3200 -97.3300 251.000 30.0 118.489 3.680 -999.990 -999.990 1.185 ..P WKT 2011 02 24 17 59 55 31.3200 -97.3300 251.000 122.0 127.642 3.650 -999.990 -999.990 1.276 ..P WKT 2011 02 24 18 04 55 31.3200 -97.3300 251.000 457.0 126.108 3.860 -999.990 -999.990 1.261 ..P WKT 2011 02 24 18 14 55 31.3200 -97.3300 251.000 30.0 133.629 3.910 -999.990 -999.990 1.336 ..P WKT 2011 02 24 18 19 55 31.3200 -97.3300 251.000 122.0 124.655 3.720 -999.990 -999.990 1.247 ..P WKT 2011 02 24 18 24 55 31.3200 -97.3300 251.000 457.0 127.032 3.680 -999.990 -999.990 1.270 ..P WKT 2011 02 24 18 29 55 31.3200 -97.3300 251.000 30.0 123.067 4.110 -999.990 -999.990 1.231 ..P WKT 2011 02 24 18 34 55 31.3200 -97.3300 251.000 122.0 121.773 4.770 -999.990 -999.990 1.218 ..P WKT 2011 02 24 18 39 55 31.3200 -97.3300 251.000 457.0 128.488 4.160 -999.990 -999.990 1.285 ..P WKT 2011 02 24 18 49 55 31.3200 -97.3300 251.000 30.0 115.103 3.750 -999.990 -999.990 1.151 ..P WKT 2011 02 24 18 54 55 31.3200 -97.3300 251.000 122.0 119.361 3.520 -999.990 -999.990 1.194 ..P WKT 2011 02 24 18 59 55 31.3200 -97.3300 251.000 457.0 124.288 5.430 -999.990 -999.990 1.243 ..P WKT 2011 02 24 19 04 55 31.3200 -97.3300 251.000 30.0 118.872 3.690 -999.990 -999.990 1.189 ..P WKT 2011 02 24 19 09 55 31.3200 -97.3300 251.000 122.0 125.798 3.620 -999.990 -999.990 1.258 ..P WKT 2011 02 24 19 14 55 31.3200 -97.3300 251.000 457.0 129.721 3.610 -999.990 -999.990 1.297 ..P WKT 2011 02 24 19 24 55 31.3200 -97.3300 251.000 30.0 120.893 3.630 -999.990 -999.990 1.209 ..P WKT 2011 02 24 19 29 55 31.3200 -97.3300 251.000 122.0 125.149 3.960 -999.990 -999.990 1.251 ..P WKT 2011 02 24 19 34 55 31.3200 -97.3300 251.000 457.0 133.072 3.960 -999.990 -999.990 1.331 ..P WKT 2011 02 24 19 39 55 31.3200 -97.3300 251.000 30.0 127.492 4.240 -999.990 -999.990 1.275 ..P WKT 2011 02 24 19 44 55 31.3200 -97.3300 251.000 122.0 131.746 3.730 -999.990 -999.990 1.317 ..P WKT 2011 02 24 19 49 55 31.3200 -97.3300 251.000 457.0 130.667 4.160 -999.990 -999.990 1.307 ..P WKT 2011 02 24 19 59 55 31.3200 -97.3300 251.000 30.0 127.747 3.660 -999.990 -999.990 1.277 ..P WKT 2011 02 24 20 04 55 31.3200 -97.3300 251.000 122.0 130.072 3.760 -999.990 -999.990 1.301 ..P WKT 2011 02 24 20 09 55 31.3200 -97.3300 251.000 457.0 127.565 3.750 -999.990 -999.990 1.276 ..P WKT 2011 02 24 20 14 55 31.3200 -97.3300 251.000 30.0 132.056 3.370 -999.990 -999.990 1.321 ..P WKT 2011 02 24 20 19 55 31.3200 -97.3300 251.000 122.0 131.882 3.320 -999.990 -999.990 1.319 ..P WKT 2011 02 24 20 24 55 31.3200 -97.3300 251.000 457.0 131.874 3.660 -999.990 -999.990 1.319 ..P WKT 2011 02 24 20 34 55 31.3200 -97.3300 251.000 30.0 130.169 4.030 -999.990 -999.990 1.302 ..P WKT 2011 02 24 20 39 55 31.3200 -97.3300 251.000 122.0 133.968 5.160 -999.990 -999.990 1.340 ..P WKT 2011 02 24 20 44 55 31.3200 -97.3300 251.000 457.0 130.606 4.170 -999.990 -999.990 1.306 ..P WKT 2011 02 24 20 49 55 31.3200 -97.3300 251.000 30.0 133.238 4.650 -999.990 -999.990 1.332 ..P WKT 2011 02 24 20 54 55 31.3200 -97.3300 251.000 122.0 135.704 4.930 -999.990 -999.990 1.357 ..P WKT 2011 02 24 20 59 55 31.3200 -97.3300 251.000 457.0 126.183 4.310 -999.990 -999.990 1.262 ..P WKT 2011 02 24 21 09 55 31.3200 -97.3300 251.000 30.0 125.669 4.100 -999.990 -999.990 1.257 ..P WKT 2011 02 24 21 14 55 31.3200 -97.3300 251.000 122.0 122.024 4.160 -999.990 -999.990 1.220 ..P WKT 2011 02 24 21 19 55 31.3200 -97.3300 251.000 457.0 116.216 3.850 -999.990 -999.990 1.162 ..P WKT 2011 02 24 21 24 55 31.3200 -97.3300 251.000 30.0 120.726 3.550 -999.990 -999.990 1.207 ..P WKT 2011 02 24 21 29 55 31.3200 -97.3300 251.000 122.0 128.230 3.600 -999.990 -999.990 1.282 ..P WKT 2011 02 24 21 34 55 31.3200 -97.3300 251.000 457.0 115.768 3.270 -999.990 -999.990 1.158 ..P WKT 2011 02 24 21 44 55 31.3200 -97.3300 251.000 30.0 120.033 2.960 -999.990 -999.990 1.200 ..P WKT 2011 02 24 21 49 55 31.3200 -97.3300 251.000 122.0 119.456 2.960 -999.990 -999.990 1.195 ..P WKT 2011 02 24 21 54 55 31.3200 -97.3300 251.000 457.0 114.887 4.080 -999.990 -999.990 1.149 ..P WKT 2011 02 24 21 59 55 31.3200 -97.3300 251.000 30.0 114.310 3.940 -999.990 -999.990 1.143 ..P WKT 2011 02 24 22 04 55 31.3200 -97.3300 251.000 122.0 114.399 4.320 -999.990 -999.990 1.144 ..P WKT 2011 02 24 22 09 55 31.3200 -97.3300 251.000 457.0 109.167 3.790 -999.990 -999.990 1.092 ..P WKT 2011 02 24 22 19 55 31.3200 -97.3300 251.000 30.0 112.384 3.800 -999.990 -999.990 1.124 ..P WKT 2011 02 24 22 24 55 31.3200 -97.3300 251.000 122.0 114.848 4.730 -999.990 -999.990 1.148 ..P WKT 2011 02 24 22 29 55 31.3200 -97.3300 251.000 457.0 114.320 3.840 -999.990 -999.990 1.143 ..P WKT 2011 02 24 22 34 55 31.3200 -97.3300 251.000 30.0 113.790 4.670 -999.990 -999.990 1.138 ..P WKT 2011 02 24 22 39 55 31.3200 -97.3300 251.000 122.0 122.902 4.910 -999.990 -999.990 1.229 ..P WKT 2011 02 24 22 44 55 31.3200 -97.3300 251.000 457.0 120.377 3.490 -999.990 -999.990 1.204 ..P WKT 2011 02 24 22 54 55 31.3200 -97.3300 251.000 30.0 117.800 3.170 -999.990 -999.990 1.178 ..P WKT 2011 02 24 22 59 55 31.3200 -97.3300 251.000 122.0 120.404 4.000 -999.990 -999.990 1.204 ..P WKT 2011 02 24 23 04 55 31.3200 -97.3300 251.000 457.0 123.341 5.150 -999.990 -999.990 1.233 ..P WKT 2011 02 24 23 09 55 31.3200 -97.3300 251.000 30.0 117.804 7.170 -999.990 -999.990 1.178 ..P WKT 2011 02 24 23 14 55 31.3200 -97.3300 251.000 122.0 120.076 5.280 -999.990 -999.990 1.201 ..P WKT 2011 02 24 23 19 55 31.3200 -97.3300 251.000 457.0 108.727 4.080 -999.990 -999.990 1.087 ..P WKT 2011 02 24 23 29 55 31.3200 -97.3300 251.000 30.0 110.329 3.590 -999.990 -999.990 1.103 ..P WKT 2011 02 24 23 34 55 31.3200 -97.3300 251.000 122.0 115.968 5.700 -999.990 -999.990 1.160 ..P WKT 2011 02 24 23 39 55 31.3200 -97.3300 251.000 457.0 118.287 6.050 -999.990 -999.990 1.183 ..P WKT 2011 02 24 23 44 55 31.3200 -97.3300 251.000 30.0 115.125 6.450 -999.990 -999.990 1.151 ..P WKT 2011 02 24 23 49 55 31.3200 -97.3300 251.000 122.0 120.431 4.380 -999.990 -999.990 1.204 ..P WKT 2011 02 25 00 09 55 31.3200 -97.3300 251.000 457.0 119.084 3.770 -999.990 -999.990 1.191 ..P WKT 2011 02 25 00 10 25 31.3200 -97.3300 251.000 457.0 120.225 3.960 -999.990 -999.990 1.202 ..P WKT 2011 02 25 00 10 55 31.3200 -97.3300 251.000 457.0 118.047 4.370 -999.990 -999.990 1.180 ..P WKT 2011 02 25 00 11 25 31.3200 -97.3300 251.000 457.0 120.019 3.770 -999.990 -999.990 1.200 ..P WKT 2011 02 25 00 11 55 31.3200 -97.3300 251.000 457.0 121.825 4.130 -999.990 -999.990 1.218 ..P WKT 2011 02 25 00 12 25 31.3200 -97.3300 251.000 457.0 125.125 3.700 -999.990 -999.990 1.251 ..P WKT 2011 02 25 00 12 55 31.3200 -97.3300 251.000 457.0 125.770 4.770 -999.990 -999.990 1.258 ..P WKT 2011 02 25 00 13 25 31.3200 -97.3300 251.000 457.0 127.908 5.170 -999.990 -999.990 1.279 ..P WKT 2011 02 25 00 13 55 31.3200 -97.3300 251.000 457.0 119.918 3.330 -999.990 -999.990 1.199 ..P WKT 2011 02 25 00 14 25 31.3200 -97.3300 251.000 457.0 120.064 3.780 -999.990 -999.990 1.201 ..P WKT 2011 02 25 00 14 55 31.3200 -97.3300 251.000 457.0 125.855 4.480 -999.990 -999.990 1.259 ..P WKT 2011 02 25 00 19 55 31.3200 -97.3300 251.000 30.0 118.845 4.660 -999.990 -999.990 1.188 ..P WKT 2011 02 25 00 24 55 31.3200 -97.3300 251.000 122.0 122.131 4.570 -999.990 -999.990 1.221 ..P WKT 2011 02 25 00 29 55 31.3200 -97.3300 251.000 457.0 128.740 4.890 -999.990 -999.990 1.287 ..P WKT 2011 02 25 00 34 55 31.3200 -97.3300 251.000 30.0 122.891 4.010 -999.990 -999.990 1.229 ..P WKT 2011 02 25 00 39 55 31.3200 -97.3300 251.000 122.0 123.354 3.840 -999.990 -999.990 1.234 ..P WKT 2011 02 25 00 44 55 31.3200 -97.3300 251.000 457.0 126.642 3.250 -999.990 -999.990 1.266 ..P WKT 2011 02 25 00 54 55 31.3200 -97.3300 251.000 30.0 123.944 3.980 -999.990 -999.990 1.239 ..P WKT 2011 02 25 00 59 55 31.3200 -97.3300 251.000 122.0 127.764 2.880 -999.990 -999.990 1.278 ..P WKT 2011 02 25 01 04 55 31.3200 -97.3300 251.000 457.0 128.425 3.030 -999.990 -999.990 1.284 ..P WKT 2011 02 25 01 09 55 31.3200 -97.3300 251.000 30.0 126.594 3.830 -999.990 -999.990 1.266 ..P WKT 2011 02 25 01 14 55 31.3200 -97.3300 251.000 122.0 127.421 3.160 -999.990 -999.990 1.274 ..P WKT 2011 02 25 01 19 55 31.3200 -97.3300 251.000 457.0 124.259 2.970 -999.990 -999.990 1.243 ..P WKT 2011 02 25 01 29 55 31.3200 -97.3300 251.000 30.0 124.062 3.160 -999.990 -999.990 1.241 ..P WKT 2011 02 25 01 34 55 31.3200 -97.3300 251.000 122.0 127.693 3.790 -999.990 -999.990 1.277 ..P WKT 2011 02 25 01 39 55 31.3200 -97.3300 251.000 457.0 125.005 3.980 -999.990 -999.990 1.250 ..P WKT 2011 02 25 01 44 55 31.3200 -97.3300 251.000 30.0 127.306 4.280 -999.990 -999.990 1.273 ..P WKT 2011 02 25 01 49 55 31.3200 -97.3300 251.000 122.0 126.614 4.150 -999.990 -999.990 1.266 ..P WKT 2011 02 25 01 54 55 31.3200 -97.3300 251.000 457.0 121.262 3.620 -999.990 -999.990 1.213 ..P WKT 2011 02 25 02 04 55 31.3200 -97.3300 251.000 30.0 132.286 4.300 -999.990 -999.990 1.323 ..P WKT 2011 02 25 02 09 55 31.3200 -97.3300 251.000 122.0 121.702 5.650 -999.990 -999.990 1.217 ..P WKT 2011 02 25 02 14 55 31.3200 -97.3300 251.000 457.0 125.099 5.270 -999.990 -999.990 1.251 ..P WKT 2011 02 25 02 19 55 31.3200 -97.3300 251.000 30.0 126.832 2.820 -999.990 -999.990 1.268 ..P WKT 2011 02 25 02 24 55 31.3200 -97.3300 251.000 122.0 121.239 4.040 -999.990 -999.990 1.212 ..P WKT 2011 02 25 02 29 55 31.3200 -97.3300 251.000 457.0 121.306 3.820 -999.990 -999.990 1.213 ..P WKT 2011 02 25 02 39 55 31.3200 -97.3300 251.000 30.0 125.486 2.570 -999.990 -999.990 1.255 ..P WKT 2011 02 25 02 44 55 31.3200 -97.3300 251.000 122.0 120.938 2.610 -999.990 -999.990 1.209 ..P WKT 2011 02 25 02 49 55 31.3200 -97.3300 251.000 457.0 148.373 4.410 -999.990 -999.990 1.484 ..P WKT 2011 02 25 02 54 55 31.3200 -97.3300 251.000 30.0 120.834 4.740 -999.990 -999.990 1.208 ..P WKT 2011 02 25 02 59 55 31.3200 -97.3300 251.000 122.0 120.283 3.580 -999.990 -999.990 1.203 ..P WKT 2011 02 25 03 04 55 31.3200 -97.3300 251.000 457.0 125.564 3.180 -999.990 -999.990 1.256 ..P WKT 2011 02 25 03 14 55 31.3200 -97.3300 251.000 30.0 114.747 3.310 -999.990 -999.990 1.147 ..P WKT 2011 02 25 03 19 55 31.3200 -97.3300 251.000 122.0 118.648 3.620 -999.990 -999.990 1.186 ..P WKT 2011 02 25 03 24 55 31.3200 -97.3300 251.000 457.0 121.382 4.200 -999.990 -999.990 1.214 ..P WKT 2011 02 25 03 29 55 31.3200 -97.3300 251.000 30.0 120.282 3.670 -999.990 -999.990 1.203 ..P WKT 2011 02 25 03 34 55 31.3200 -97.3300 251.000 122.0 128.854 4.330 -999.990 -999.990 1.289 ..P WKT 2011 02 25 03 39 55 31.3200 -97.3300 251.000 457.0 127.922 2.640 -999.990 -999.990 1.279 ..P WKT 2011 02 25 03 49 55 31.3200 -97.3300 251.000 30.0 124.674 3.680 -999.990 -999.990 1.247 ..P WKT 2011 02 25 03 54 55 31.3200 -97.3300 251.000 122.0 136.039 4.020 -999.990 -999.990 1.360 ..P WKT 2011 02 25 03 59 55 31.3200 -97.3300 251.000 457.0 125.716 3.790 -999.990 -999.990 1.257 ..P WKT 2011 02 25 04 04 55 31.3200 -97.3300 251.000 30.0 124.569 3.980 -999.990 -999.990 1.246 ..P WKT 2011 02 25 04 09 55 31.3200 -97.3300 251.000 122.0 135.603 2.960 -999.990 -999.990 1.356 ..P WKT 2011 02 25 04 14 55 31.3200 -97.3300 251.000 457.0 121.939 3.100 -999.990 -999.990 1.219 ..P WKT 2011 02 25 04 24 55 31.3200 -97.3300 251.000 30.0 124.840 3.090 -999.990 -999.990 1.248 ..P WKT 2011 02 25 04 29 55 31.3200 -97.3300 251.000 122.0 133.734 4.140 -999.990 -999.990 1.337 ..P WKT 2011 02 25 04 34 55 31.3200 -97.3300 251.000 457.0 122.925 4.430 -999.990 -999.990 1.229 ..P WKT 2011 02 25 04 39 55 31.3200 -97.3300 251.000 30.0 126.310 3.350 -999.990 -999.990 1.263 ..P WKT 2011 02 25 04 44 55 31.3200 -97.3300 251.000 122.0 131.197 4.690 -999.990 -999.990 1.312 ..P WKT 2011 02 25 04 49 55 31.3200 -97.3300 251.000 457.0 124.561 3.680 -999.990 -999.990 1.246 ..P WKT 2011 02 25 05 04 55 31.3200 -97.3300 251.000 30.0 127.068 4.190 -999.990 -999.990 1.271 ..P WKT 2011 02 25 05 09 55 31.3200 -97.3300 251.000 122.0 131.307 3.250 -999.990 -999.990 1.313 ..P WKT 2011 02 25 05 14 55 31.3200 -97.3300 251.000 457.0 133.209 3.870 -999.990 -999.990 1.332 ..P WKT 2011 02 25 05 19 55 31.3200 -97.3300 251.000 30.0 126.754 2.920 -999.990 -999.990 1.268 ..P WKT 2011 02 25 05 24 55 31.3200 -97.3300 251.000 122.0 159.744 3.620 -999.990 -999.990 1.597 ..P WKT 2011 02 25 05 29 55 31.3200 -97.3300 251.000 457.0 142.257 3.980 -999.990 -999.990 1.423 ..P WKT 2011 02 25 05 39 55 31.3200 -97.3300 251.000 30.0 143.752 2.960 -999.990 -999.990 1.438 ..P WKT 2011 02 25 05 44 55 31.3200 -97.3300 251.000 122.0 170.769 3.220 -999.990 -999.990 1.708 ..P WKT 2011 02 25 05 49 55 31.3200 -97.3300 251.000 457.0 155.982 3.180 -999.990 -999.990 1.560 ..P WKT 2011 02 25 05 54 55 31.3200 -97.3300 251.000 30.0 153.234 3.480 -999.990 -999.990 1.532 ..P WKT 2011 02 25 05 59 55 31.3200 -97.3300 251.000 122.0 166.544 3.630 -999.990 -999.990 1.665 ..P WKT 2011 02 25 06 04 55 31.3200 -97.3300 251.000 457.0 142.717 3.870 -999.990 -999.990 1.427 ..P WKT 2011 02 25 06 14 55 31.3200 -97.3300 251.000 30.0 163.701 3.610 -999.990 -999.990 1.637 ..P WKT 2011 02 25 06 19 55 31.3200 -97.3300 251.000 122.0 177.066 3.550 -999.990 -999.990 1.771 ..P WKT 2011 02 25 06 24 55 31.3200 -97.3300 251.000 457.0 148.258 4.590 -999.990 -999.990 1.483 ..P WKT 2011 02 25 06 29 55 31.3200 -97.3300 251.000 30.0 166.980 2.880 -999.990 -999.990 1.670 ..P WKT 2011 02 25 06 34 55 31.3200 -97.3300 251.000 122.0 177.000 2.880 -999.990 -999.990 1.770 ..P WKT 2011 02 25 06 39 55 31.3200 -97.3300 251.000 457.0 138.473 2.630 -999.990 -999.990 1.385 ..P WKT 2011 02 25 06 49 55 31.3200 -97.3300 251.000 30.0 156.339 3.870 -999.990 -999.990 1.563 ..P WKT 2011 02 25 06 54 55 31.3200 -97.3300 251.000 122.0 164.186 2.790 -999.990 -999.990 1.642 ..P WKT 2011 02 25 06 59 55 31.3200 -97.3300 251.000 457.0 137.700 4.410 -999.990 -999.990 1.377 ..P WKT 2011 02 25 07 04 55 31.3200 -97.3300 251.000 30.0 163.134 3.090 -999.990 -999.990 1.631 ..P WKT 2011 02 25 07 09 55 31.3200 -97.3300 251.000 122.0 166.963 3.080 -999.990 -999.990 1.670 ..P WKT 2011 02 25 07 14 55 31.3200 -97.3300 251.000 457.0 127.066 3.580 -999.990 -999.990 1.271 ..P WKT 2011 02 25 07 24 55 31.3200 -97.3300 251.000 30.0 170.797 3.180 -999.990 -999.990 1.708 ..P WKT 2011 02 25 07 29 55 31.3200 -97.3300 251.000 122.0 167.638 4.230 -999.990 -999.990 1.676 ..P WKT 2011 02 25 07 34 55 31.3200 -97.3300 251.000 457.0 158.277 5.130 -999.990 -999.990 1.583 ..P WKT 2011 02 25 07 39 55 31.3200 -97.3300 251.000 30.0 170.370 2.980 -999.990 -999.990 1.704 ..P WKT 2011 02 25 07 44 55 31.3200 -97.3300 251.000 122.0 171.401 2.800 -999.990 -999.990 1.714 ..P WKT 2011 02 25 07 49 55 31.3200 -97.3300 251.000 457.0 138.898 2.870 -999.990 -999.990 1.389 ..P WKT 2011 02 25 07 59 55 31.3200 -97.3300 251.000 30.0 170.974 3.110 -999.990 -999.990 1.710 ..P WKT 2011 02 25 08 04 55 31.3200 -97.3300 251.000 122.0 169.826 2.970 -999.990 -999.990 1.698 ..P WKT 2011 02 25 08 09 55 31.3200 -97.3300 251.000 457.0 145.026 3.690 -999.990 -999.990 1.450 ..P WKT 2011 02 25 08 14 55 31.3200 -97.3300 251.000 30.0 171.721 2.780 -999.990 -999.990 1.717 ..P WKT 2011 02 25 08 19 55 31.3200 -97.3300 251.000 122.0 169.063 2.890 -999.990 -999.990 1.691 ..P WKT 2011 02 25 08 24 55 31.3200 -97.3300 251.000 457.0 144.422 3.210 -999.990 -999.990 1.444 ..P WKT 2011 02 25 08 34 55 31.3200 -97.3300 251.000 30.0 162.569 2.820 -999.990 -999.990 1.626 ..P WKT 2011 02 25 08 39 55 31.3200 -97.3300 251.000 122.0 168.444 3.130 -999.990 -999.990 1.684 ..P WKT 2011 02 25 08 44 55 31.3200 -97.3300 251.000 457.0 137.222 2.700 -999.990 -999.990 1.372 ..P WKT 2011 02 25 08 49 55 31.3200 -97.3300 251.000 30.0 155.687 3.210 -999.990 -999.990 1.557 ..P WKT 2011 02 25 08 54 55 31.3200 -97.3300 251.000 122.0 157.030 3.570 -999.990 -999.990 1.570 ..P WKT 2011 02 25 08 59 55 31.3200 -97.3300 251.000 457.0 133.353 4.000 -999.990 -999.990 1.334 ..P WKT 2011 02 25 09 09 55 31.3200 -97.3300 251.000 30.0 155.110 4.110 -999.990 -999.990 1.551 ..P WKT 2011 02 25 09 14 55 31.3200 -97.3300 251.000 122.0 156.046 2.890 -999.990 -999.990 1.560 ..P WKT 2011 02 25 09 19 55 31.3200 -97.3300 251.000 457.0 135.143 2.660 -999.990 -999.990 1.351 ..P WKT 2011 02 25 09 24 55 31.3200 -97.3300 251.000 30.0 162.286 2.700 -999.990 -999.990 1.623 ..P WKT 2011 02 25 09 29 55 31.3200 -97.3300 251.000 122.0 160.871 2.730 -999.990 -999.990 1.609 ..P WKT 2011 02 25 09 34 55 31.3200 -97.3300 251.000 457.0 144.330 2.360 -999.990 -999.990 1.443 ..P WKT 2011 02 25 09 44 55 31.3200 -97.3300 251.000 30.0 156.045 2.890 -999.990 -999.990 1.560 ..P WKT 2011 02 25 09 49 55 31.3200 -97.3300 251.000 122.0 167.836 6.570 -999.990 -999.990 1.678 ..P WKT 2011 02 25 09 54 55 31.3200 -97.3300 251.000 457.0 134.237 2.660 -999.990 -999.990 1.342 ..P WKT 2011 02 25 09 59 55 31.3200 -97.3300 251.000 30.0 157.797 3.500 -999.990 -999.990 1.578 ..P WKT 2011 02 25 10 04 55 31.3200 -97.3300 251.000 122.0 165.220 2.990 -999.990 -999.990 1.652 ..P WKT 2011 02 25 10 09 55 31.3200 -97.3300 251.000 457.0 137.329 5.750 -999.990 -999.990 1.373 ..P WKT 2011 02 25 10 19 55 31.3200 -97.3300 251.000 30.0 155.058 3.090 -999.990 -999.990 1.551 ..P WKT 2011 02 25 10 24 55 31.3200 -97.3300 251.000 122.0 165.031 2.900 -999.990 -999.990 1.650 ..P WKT 2011 02 25 10 29 55 31.3200 -97.3300 251.000 457.0 139.338 3.200 -999.990 -999.990 1.393 ..P WKT 2011 02 25 10 34 55 31.3200 -97.3300 251.000 30.0 158.399 2.790 -999.990 -999.990 1.584 ..P WKT 2011 02 25 10 39 55 31.3200 -97.3300 251.000 122.0 161.308 3.340 -999.990 -999.990 1.613 ..P WKT 2011 02 25 10 44 55 31.3200 -97.3300 251.000 457.0 133.586 3.280 -999.990 -999.990 1.336 ..P WKT 2011 02 25 10 54 55 31.3200 -97.3300 251.000 30.0 155.849 4.450 -999.990 -999.990 1.558 ..P WKT 2011 02 25 10 59 55 31.3200 -97.3300 251.000 122.0 144.401 3.720 -999.990 -999.990 1.444 ..P WKT 2011 02 25 11 04 55 31.3200 -97.3300 251.000 457.0 138.170 3.010 -999.990 -999.990 1.382 ..P WKT 2011 02 25 11 09 55 31.3200 -97.3300 251.000 30.0 149.955 3.870 -999.990 -999.990 1.500 ..P WKT 2011 02 25 11 14 55 31.3200 -97.3300 251.000 122.0 153.154 4.270 -999.990 -999.990 1.532 ..P WKT 2011 02 25 11 19 55 31.3200 -97.3300 251.000 457.0 141.195 2.630 -999.990 -999.990 1.412 ..P WKT 2011 02 25 11 29 55 31.3200 -97.3300 251.000 30.0 154.525 2.730 -999.990 -999.990 1.545 ..P WKT 2011 02 25 11 34 55 31.3200 -97.3300 251.000 122.0 149.157 3.010 -999.990 -999.990 1.492 ..P WKT 2011 02 25 11 39 55 31.3200 -97.3300 251.000 457.0 134.015 3.370 -999.990 -999.990 1.340 ..P WKT 2011 02 25 11 44 55 31.3200 -97.3300 251.000 30.0 152.405 3.610 -999.990 -999.990 1.524 ..P WKT 2011 02 25 11 49 55 31.3200 -97.3300 251.000 122.0 159.001 2.760 -999.990 -999.990 1.590 ..P WKT 2011 02 25 12 09 55 31.3200 -97.3300 251.000 457.0 129.901 2.510 -999.990 -999.990 1.299 ..P WKT 2011 02 25 12 10 25 31.3200 -97.3300 251.000 457.0 132.822 1.950 -999.990 -999.990 1.328 ..P WKT 2011 02 25 12 10 55 31.3200 -97.3300 251.000 457.0 136.587 2.530 -999.990 -999.990 1.366 ..P WKT 2011 02 25 12 11 25 31.3200 -97.3300 251.000 457.0 133.438 4.070 -999.990 -999.990 1.334 ..P WKT 2011 02 25 12 11 55 31.3200 -97.3300 251.000 457.0 128.941 3.590 -999.990 -999.990 1.289 ..P WKT 2011 02 25 12 12 25 31.3200 -97.3300 251.000 457.0 139.956 3.140 -999.990 -999.990 1.400 ..P WKT 2011 02 25 12 12 55 31.3200 -97.3300 251.000 457.0 137.650 2.910 -999.990 -999.990 1.377 ..P WKT 2011 02 25 12 13 25 31.3200 -97.3300 251.000 457.0 139.561 2.390 -999.990 -999.990 1.396 ..P WKT 2011 02 25 12 13 55 31.3200 -97.3300 251.000 457.0 138.099 3.240 -999.990 -999.990 1.381 ..P WKT 2011 02 25 12 14 25 31.3200 -97.3300 251.000 457.0 135.962 2.000 -999.990 -999.990 1.360 ..P WKT 2011 02 25 12 14 55 31.3200 -97.3300 251.000 457.0 135.005 2.390 -999.990 -999.990 1.350 ..P WKT 2011 02 25 12 19 55 31.3200 -97.3300 251.000 30.0 166.243 3.340 -999.990 -999.990 1.662 ..P WKT 2011 02 25 12 24 55 31.3200 -97.3300 251.000 122.0 160.390 2.810 -999.990 -999.990 1.604 ..P WKT 2011 02 25 12 29 55 31.3200 -97.3300 251.000 457.0 159.425 3.230 -999.990 -999.990 1.594 ..P WKT 2011 02 25 12 34 55 31.3200 -97.3300 251.000 30.0 155.088 3.380 -999.990 -999.990 1.551 ..P WKT 2011 02 25 12 39 55 31.3200 -97.3300 251.000 122.0 160.868 3.950 -999.990 -999.990 1.609 ..P WKT 2011 02 25 12 44 55 31.3200 -97.3300 251.000 457.0 161.421 2.560 -999.990 -999.990 1.614 ..P WKT 2011 02 25 12 54 55 31.3200 -97.3300 251.000 30.0 156.231 2.640 -999.990 -999.990 1.562 ..P WKT 2011 02 25 12 59 55 31.3200 -97.3300 251.000 122.0 156.222 3.270 -999.990 -999.990 1.562 ..P WKT 2011 02 25 13 04 55 31.3200 -97.3300 251.000 457.0 167.007 3.710 -999.990 -999.990 1.670 ..P WKT 2011 02 25 13 09 55 31.3200 -97.3300 251.000 30.0 158.227 3.840 -999.990 -999.990 1.582 ..P WKT 2011 02 25 13 14 55 31.3200 -97.3300 251.000 122.0 157.882 3.220 -999.990 -999.990 1.579 ..P WKT 2011 02 25 13 19 55 31.3200 -97.3300 251.000 457.0 161.583 3.590 -999.990 -999.990 1.616 ..P WKT 2011 02 25 13 29 55 31.3200 -97.3300 251.000 30.0 159.396 4.140 -999.990 -999.990 1.594 ..P WKT 2011 02 25 13 34 55 31.3200 -97.3300 251.000 122.0 155.531 3.410 -999.990 -999.990 1.555 ..P WKT 2011 02 25 13 39 55 31.3200 -97.3300 251.000 457.0 159.089 3.120 -999.990 -999.990 1.591 ..P WKT 2011 02 25 13 44 55 31.3200 -97.3300 251.000 30.0 163.659 4.480 -999.990 -999.990 1.637 ..P WKT 2011 02 25 13 49 55 31.3200 -97.3300 251.000 122.0 149.334 3.810 -999.990 -999.990 1.493 ..P WKT 2011 02 25 13 54 55 31.3200 -97.3300 251.000 457.0 159.978 5.400 -999.990 -999.990 1.600 ..P WKT 2011 02 25 14 04 55 31.3200 -97.3300 251.000 30.0 161.840 3.960 -999.990 -999.990 1.618 ..P WKT 2011 02 25 14 09 55 31.3200 -97.3300 251.000 122.0 154.744 3.010 -999.990 -999.990 1.547 ..P WKT 2011 02 25 14 14 55 31.3200 -97.3300 251.000 457.0 154.397 4.090 -999.990 -999.990 1.544 ..P WKT 2011 02 25 14 19 55 31.3200 -97.3300 251.000 30.0 158.776 5.710 -999.990 -999.990 1.588 ..P WKT 2011 02 25 14 24 55 31.3200 -97.3300 251.000 122.0 159.779 3.840 -999.990 -999.990 1.598 ..P WKT 2011 02 25 14 29 55 31.3200 -97.3300 251.000 457.0 150.318 3.880 -999.990 -999.990 1.503 ..P WKT 2011 02 25 14 39 55 31.3200 -97.3300 251.000 30.0 162.935 3.770 -999.990 -999.990 1.629 ..P WKT 2011 02 25 14 44 55 31.3200 -97.3300 251.000 122.0 155.306 4.160 -999.990 -999.990 1.553 ..P WKT 2011 02 25 14 49 55 31.3200 -97.3300 251.000 457.0 155.948 4.570 -999.990 -999.990 1.559 ..P WKT 2011 02 25 14 54 55 31.3200 -97.3300 251.000 30.0 171.613 4.110 -999.990 -999.990 1.716 ..P WKT 2011 02 25 14 59 55 31.3200 -97.3300 251.000 122.0 168.204 3.760 -999.990 -999.990 1.682 ..P WKT 2011 02 25 15 04 55 31.3200 -97.3300 251.000 457.0 149.433 4.130 -999.990 -999.990 1.494 ..P WKT 2011 02 25 15 14 55 31.3200 -97.3300 251.000 30.0 170.975 4.030 -999.990 -999.990 1.710 ..P WKT 2011 02 25 15 19 55 31.3200 -97.3300 251.000 122.0 168.917 3.650 -999.990 -999.990 1.689 ..P WKT 2011 02 25 15 24 55 31.3200 -97.3300 251.000 457.0 176.819 4.140 -999.990 -999.990 1.768 ..P WKT 2011 02 25 15 29 55 31.3200 -97.3300 251.000 30.0 162.603 3.800 -999.990 -999.990 1.626 ..P WKT 2011 02 25 15 34 55 31.3200 -97.3300 251.000 122.0 162.064 3.730 -999.990 -999.990 1.621 ..P WKT 2011 02 25 15 39 55 31.3200 -97.3300 251.000 457.0 164.563 4.920 -999.990 -999.990 1.646 ..P WKT 2011 02 25 15 49 55 31.3200 -97.3300 251.000 30.0 162.399 3.820 -999.990 -999.990 1.624 ..P WKT 2011 02 25 15 54 55 31.3200 -97.3300 251.000 122.0 166.852 4.130 -999.990 -999.990 1.669 ..P WKT 2011 02 25 15 59 55 31.3200 -97.3300 251.000 457.0 167.253 4.130 -999.990 -999.990 1.673 ..P WKT 2011 02 25 16 04 55 31.3200 -97.3300 251.000 30.0 162.757 4.670 -999.990 -999.990 1.628 ..P WKT 2011 02 25 16 09 55 31.3200 -97.3300 251.000 122.0 167.043 4.250 -999.990 -999.990 1.670 ..P WKT 2011 02 25 16 14 55 31.3200 -97.3300 251.000 457.0 167.951 3.050 -999.990 -999.990 1.680 ..P WKT 2011 02 25 16 24 55 31.3200 -97.3300 251.000 30.0 168.344 4.580 -999.990 -999.990 1.683 ..P WKT 2011 02 25 16 29 55 31.3200 -97.3300 251.000 122.0 169.517 3.910 -999.990 -999.990 1.695 ..P WKT 2011 02 25 16 34 55 31.3200 -97.3300 251.000 457.0 165.623 4.740 -999.990 -999.990 1.656 ..P WKT 2011 02 25 16 39 55 31.3200 -97.3300 251.000 30.0 165.953 4.580 -999.990 -999.990 1.660 ..P WKT 2011 02 25 16 44 55 31.3200 -97.3300 251.000 122.0 164.593 4.590 -999.990 -999.990 1.646 ..P WKT 2011 02 25 16 49 55 31.3200 -97.3300 251.000 457.0 161.542 3.250 -999.990 -999.990 1.615 ..P WKT 2011 02 25 17 04 55 31.3200 -97.3300 251.000 30.0 168.696 4.470 -999.990 -999.990 1.687 ..P WKT 2011 02 25 17 09 55 31.3200 -97.3300 251.000 122.0 177.178 4.530 -999.990 -999.990 1.772 ..P WKT 2011 02 25 17 14 55 31.3200 -97.3300 251.000 457.0 165.383 4.760 -999.990 -999.990 1.654 ..P WKT 2011 02 25 17 19 55 31.3200 -97.3300 251.000 30.0 170.148 5.050 -999.990 -999.990 1.701 ..P WKT 2011 02 25 17 24 55 31.3200 -97.3300 251.000 122.0 173.900 3.590 -999.990 -999.990 1.739 ..P WKT 2011 02 25 17 29 55 31.3200 -97.3300 251.000 457.0 175.285 3.440 -999.990 -999.990 1.753 ..P WKT 2011 02 25 17 39 55 31.3200 -97.3300 251.000 30.0 171.979 3.230 -999.990 -999.990 1.720 ..P WKT 2011 02 25 17 44 55 31.3200 -97.3300 251.000 122.0 168.976 4.310 -999.990 -999.990 1.690 ..P WKT 2011 02 25 17 49 55 31.3200 -97.3300 251.000 457.0 171.720 4.610 -999.990 -999.990 1.717 ..P WKT 2011 02 25 17 54 55 31.3200 -97.3300 251.000 30.0 164.999 5.080 -999.990 -999.990 1.650 ..P WKT 2011 02 25 17 59 55 31.3200 -97.3300 251.000 122.0 168.418 4.670 -999.990 -999.990 1.684 ..P WKT 2011 02 25 18 04 55 31.3200 -97.3300 251.000 457.0 172.177 4.050 -999.990 -999.990 1.722 ..P WKT 2011 02 25 18 14 55 31.3200 -97.3300 251.000 30.0 168.537 3.790 -999.990 -999.990 1.685 ..P WKT 2011 02 25 18 19 55 31.3200 -97.3300 251.000 122.0 170.606 4.560 -999.990 -999.990 1.706 ..P WKT 2011 02 25 18 24 55 31.3200 -97.3300 251.000 457.0 168.616 4.950 -999.990 -999.990 1.686 ..P WKT 2011 02 25 18 29 55 31.3200 -97.3300 251.000 30.0 168.656 6.060 -999.990 -999.990 1.687 ..P WKT 2011 02 25 18 34 55 31.3200 -97.3300 251.000 122.0 175.458 7.270 -999.990 -999.990 1.755 ..P WKT 2011 02 25 18 39 55 31.3200 -97.3300 251.000 457.0 164.001 5.780 -999.990 -999.990 1.640 ..P WKT 2011 02 25 18 49 55 31.3200 -97.3300 251.000 30.0 171.568 3.910 -999.990 -999.990 1.716 ..P WKT 2011 02 25 18 54 55 31.3200 -97.3300 251.000 122.0 170.134 5.010 -999.990 -999.990 1.701 ..P WKT 2011 02 25 18 59 55 31.3200 -97.3300 251.000 457.0 164.810 5.080 -999.990 -999.990 1.648 ..P WKT 2011 02 25 19 04 55 31.3200 -97.3300 251.000 30.0 164.729 4.500 -999.990 -999.990 1.647 ..P WKT 2011 02 25 19 09 55 31.3200 -97.3300 251.000 122.0 160.589 4.390 -999.990 -999.990 1.606 ..P WKT 2011 02 25 19 14 55 31.3200 -97.3300 251.000 457.0 166.426 3.670 -999.990 -999.990 1.664 ..P WKT 2011 02 25 19 24 55 31.3200 -97.3300 251.000 30.0 164.765 4.390 -999.990 -999.990 1.648 ..P WKT 2011 02 25 19 29 55 31.3200 -97.3300 251.000 122.0 166.231 4.080 -999.990 -999.990 1.662 ..P WKT 2011 02 25 19 34 55 31.3200 -97.3300 251.000 457.0 160.930 3.620 -999.990 -999.990 1.609 ..P WKT 2011 02 25 19 39 55 31.3200 -97.3300 251.000 30.0 157.321 3.730 -999.990 -999.990 1.573 ..P WKT 2011 02 25 19 44 55 31.3200 -97.3300 251.000 122.0 161.492 3.660 -999.990 -999.990 1.615 ..P WKT 2011 02 25 19 49 55 31.3200 -97.3300 251.000 457.0 163.972 4.130 -999.990 -999.990 1.640 ..P WKT 2011 02 25 19 59 55 31.3200 -97.3300 251.000 30.0 161.368 3.320 -999.990 -999.990 1.614 ..P WKT 2011 02 25 20 04 55 31.3200 -97.3300 251.000 122.0 164.066 3.800 -999.990 -999.990 1.641 ..P WKT 2011 02 25 20 09 55 31.3200 -97.3300 251.000 457.0 166.595 4.920 -999.990 -999.990 1.666 ..P WKT 2011 02 25 20 14 55 31.3200 -97.3300 251.000 30.0 164.894 5.990 -999.990 -999.990 1.649 ..P WKT 2011 02 25 20 19 55 31.3200 -97.3300 251.000 122.0 163.532 5.690 -999.990 -999.990 1.635 ..P WKT 2011 02 25 20 24 55 31.3200 -97.3300 251.000 457.0 172.152 4.910 -999.990 -999.990 1.722 ..P WKT 2011 02 25 20 34 55 31.3200 -97.3300 251.000 30.0 167.662 4.800 -999.990 -999.990 1.677 ..P WKT 2011 02 25 20 39 55 31.3200 -97.3300 251.000 122.0 163.350 5.070 -999.990 -999.990 1.633 ..P WKT 2011 02 25 20 44 55 31.3200 -97.3300 251.000 457.0 162.423 5.940 -999.990 -999.990 1.624 ..P WKT 2011 02 25 20 49 55 31.3200 -97.3300 251.000 30.0 160.310 5.090 -999.990 -999.990 1.603 ..P WKT 2011 02 25 20 54 55 31.3200 -97.3300 251.000 122.0 157.183 5.350 -999.990 -999.990 1.572 ..P WKT 2011 02 25 20 59 55 31.3200 -97.3300 251.000 457.0 158.455 3.990 -999.990 -999.990 1.585 ..P WKT 2011 02 25 21 09 55 31.3200 -97.3300 251.000 30.0 162.910 4.220 -999.990 -999.990 1.629 ..P WKT 2011 02 25 21 14 55 31.3200 -97.3300 251.000 122.0 160.676 5.330 -999.990 -999.990 1.607 ..P WKT 2011 02 25 21 19 55 31.3200 -97.3300 251.000 457.0 159.119 5.180 -999.990 -999.990 1.591 ..P WKT 2011 02 25 21 24 55 31.3200 -97.3300 251.000 30.0 168.734 4.390 -999.990 -999.990 1.687 ..P WKT 2011 02 25 21 29 55 31.3200 -97.3300 251.000 122.0 162.438 4.380 -999.990 -999.990 1.624 ..P WKT 2011 02 25 21 34 55 31.3200 -97.3300 251.000 457.0 159.527 4.770 -999.990 -999.990 1.595 ..P WKT 2011 02 25 21 44 55 31.3200 -97.3300 251.000 30.0 167.296 5.260 -999.990 -999.990 1.673 ..P WKT 2011 02 25 21 49 55 31.3200 -97.3300 251.000 122.0 176.284 4.310 -999.990 -999.990 1.763 ..P WKT 2011 02 25 21 54 55 31.3200 -97.3300 251.000 457.0 166.988 4.320 -999.990 -999.990 1.670 ..P WKT 2011 02 25 21 59 55 31.3200 -97.3300 251.000 30.0 168.189 4.380 -999.990 -999.990 1.682 ..P WKT 2011 02 25 22 04 55 31.3200 -97.3300 251.000 122.0 176.839 4.150 -999.990 -999.990 1.768 ..P WKT 2011 02 25 22 09 55 31.3200 -97.3300 251.000 457.0 171.267 4.100 -999.990 -999.990 1.713 ..P WKT 2011 02 25 22 19 55 31.3200 -97.3300 251.000 30.0 183.756 4.200 -999.990 -999.990 1.838 ..P WKT 2011 02 25 22 24 55 31.3200 -97.3300 251.000 122.0 192.675 4.940 -999.990 -999.990 1.927 ..P WKT 2011 02 25 22 29 55 31.3200 -97.3300 251.000 457.0 191.095 4.530 -999.990 -999.990 1.911 ..P WKT 2011 02 25 22 34 55 31.3200 -97.3300 251.000 30.0 205.095 5.030 -999.990 -999.990 2.051 ..P WKT 2011 02 25 22 39 55 31.3200 -97.3300 251.000 122.0 204.531 6.150 -999.990 -999.990 2.045 ..P WKT 2011 02 25 22 44 55 31.3200 -97.3300 251.000 457.0 198.209 5.410 -999.990 -999.990 1.982 ..P WKT 2011 02 25 22 54 55 31.3200 -97.3300 251.000 30.0 186.240 5.600 -999.990 -999.990 1.862 ..P WKT 2011 02 25 22 59 55 31.3200 -97.3300 251.000 122.0 178.222 5.530 -999.990 -999.990 1.782 ..P WKT 2011 02 25 23 04 55 31.3200 -97.3300 251.000 457.0 189.514 4.850 -999.990 -999.990 1.895 ..P WKT 2011 02 25 23 09 55 31.3200 -97.3300 251.000 30.0 176.414 5.810 -999.990 -999.990 1.764 ..P WKT 2011 02 25 23 14 55 31.3200 -97.3300 251.000 122.0 175.341 4.500 -999.990 -999.990 1.753 ..P WKT 2011 02 25 23 19 55 31.3200 -97.3300 251.000 457.0 171.048 4.620 -999.990 -999.990 1.710 ..P WKT 2011 02 25 23 29 55 31.3200 -97.3300 251.000 30.0 174.879 4.260 -999.990 -999.990 1.749 ..P WKT 2011 02 25 23 34 55 31.3200 -97.3300 251.000 122.0 167.077 4.390 -999.990 -999.990 1.671 ..P WKT 2011 02 25 23 39 55 31.3200 -97.3300 251.000 457.0 178.759 4.520 -999.990 -999.990 1.788 ..P WKT 2011 02 25 23 44 55 31.3200 -97.3300 251.000 30.0 168.245 4.780 -999.990 -999.990 1.682 ..P WKT 2011 02 25 23 49 55 31.3200 -97.3300 251.000 122.0 175.014 5.290 -999.990 -999.990 1.750 ..P WKT 2011 02 26 00 09 55 31.3200 -97.3300 251.000 457.0 182.681 5.610 -999.990 -999.990 1.827 ..P WKT 2011 02 26 00 10 25 31.3200 -97.3300 251.000 457.0 179.871 5.630 -999.990 -999.990 1.799 ..P WKT 2011 02 26 00 10 55 31.3200 -97.3300 251.000 457.0 178.755 5.540 -999.990 -999.990 1.788 ..P WKT 2011 02 26 00 11 25 31.3200 -97.3300 251.000 457.0 185.262 4.980 -999.990 -999.990 1.853 ..P WKT 2011 02 26 00 11 55 31.3200 -97.3300 251.000 457.0 174.149 4.570 -999.990 -999.990 1.741 ..P WKT 2011 02 26 00 12 25 31.3200 -97.3300 251.000 457.0 175.573 4.770 -999.990 -999.990 1.756 ..P WKT 2011 02 26 00 12 55 31.3200 -97.3300 251.000 457.0 182.928 4.600 -999.990 -999.990 1.829 ..P WKT 2011 02 26 00 13 25 31.3200 -97.3300 251.000 457.0 177.067 4.840 -999.990 -999.990 1.771 ..P WKT 2011 02 26 00 13 55 31.3200 -97.3300 251.000 457.0 178.322 4.210 -999.990 -999.990 1.783 ..P WKT 2011 02 26 00 14 25 31.3200 -97.3300 251.000 457.0 180.763 4.370 -999.990 -999.990 1.808 ..P WKT 2011 02 26 00 14 55 31.3200 -97.3300 251.000 457.0 179.478 4.590 -999.990 -999.990 1.795 ..P WKT 2011 02 26 00 19 55 31.3200 -97.3300 251.000 30.0 165.602 4.360 -999.990 -999.990 1.656 ..P WKT 2011 02 26 00 24 55 31.3200 -97.3300 251.000 122.0 166.804 4.720 -999.990 -999.990 1.668 ..P WKT 2011 02 26 00 29 55 31.3200 -97.3300 251.000 457.0 159.706 4.550 -999.990 -999.990 1.597 ..P WKT 2011 02 26 00 34 55 31.3200 -97.3300 251.000 30.0 168.528 4.450 -999.990 -999.990 1.685 ..P WKT 2011 02 26 00 39 55 31.3200 -97.3300 251.000 122.0 167.697 5.260 -999.990 -999.990 1.677 ..P WKT 2011 02 26 00 44 55 31.3200 -97.3300 251.000 457.0 156.199 4.840 -999.990 -999.990 1.562 ..P WKT 2011 02 26 00 54 55 31.3200 -97.3300 251.000 30.0 167.212 4.050 -999.990 -999.990 1.672 ..P WKT 2011 02 26 00 59 55 31.3200 -97.3300 251.000 122.0 153.829 4.430 -999.990 -999.990 1.538 ..P WKT 2011 02 26 01 04 55 31.3200 -97.3300 251.000 457.0 152.637 5.440 -999.990 -999.990 1.526 ..P WKT 2011 02 26 01 09 55 31.3200 -97.3300 251.000 30.0 159.569 4.100 -999.990 -999.990 1.596 ..P WKT 2011 02 26 01 14 55 31.3200 -97.3300 251.000 122.0 165.147 4.320 -999.990 -999.990 1.651 ..P WKT 2011 02 26 01 19 55 31.3200 -97.3300 251.000 457.0 150.414 3.940 -999.990 -999.990 1.504 ..P WKT 2011 02 26 01 29 55 31.3200 -97.3300 251.000 30.0 164.131 4.700 -999.990 -999.990 1.641 ..P WKT 2011 02 26 01 34 55 31.3200 -97.3300 251.000 122.0 161.778 3.810 -999.990 -999.990 1.618 ..P WKT 2011 02 26 01 39 55 31.3200 -97.3300 251.000 457.0 151.981 3.990 -999.990 -999.990 1.520 ..P WKT 2011 02 26 01 44 55 31.3200 -97.3300 251.000 30.0 157.411 4.600 -999.990 -999.990 1.574 ..P WKT 2011 02 26 01 49 55 31.3200 -97.3300 251.000 122.0 156.751 4.120 -999.990 -999.990 1.568 ..P WKT 2011 02 26 01 54 55 31.3200 -97.3300 251.000 457.0 173.682 4.120 -999.990 -999.990 1.737 ..P WKT 2011 02 26 02 04 55 31.3200 -97.3300 251.000 30.0 160.642 4.460 -999.990 -999.990 1.606 ..P WKT 2011 02 26 02 09 55 31.3200 -97.3300 251.000 122.0 157.058 3.990 -999.990 -999.990 1.571 ..P WKT 2011 02 26 02 14 55 31.3200 -97.3300 251.000 457.0 168.357 3.490 -999.990 -999.990 1.684 ..P WKT 2011 02 26 02 19 55 31.3200 -97.3300 251.000 30.0 162.067 4.400 -999.990 -999.990 1.621 ..P WKT 2011 02 26 02 24 55 31.3200 -97.3300 251.000 122.0 165.586 3.400 -999.990 -999.990 1.656 ..P WKT 2011 02 26 02 29 55 31.3200 -97.3300 251.000 457.0 165.384 3.410 -999.990 -999.990 1.654 ..P WKT 2011 02 26 02 39 55 31.3200 -97.3300 251.000 30.0 156.046 3.330 -999.990 -999.990 1.560 ..P WKT 2011 02 26 02 44 55 31.3200 -97.3300 251.000 122.0 158.236 3.310 -999.990 -999.990 1.582 ..P WKT 2011 02 26 02 49 55 31.3200 -97.3300 251.000 457.0 167.355 4.030 -999.990 -999.990 1.674 ..P WKT 2011 02 26 02 54 55 31.3200 -97.3300 251.000 30.0 167.177 3.550 -999.990 -999.990 1.672 ..P WKT 2011 02 26 02 59 55 31.3200 -97.3300 251.000 122.0 157.367 4.060 -999.990 -999.990 1.574 ..P WKT 2011 02 26 03 04 55 31.3200 -97.3300 251.000 457.0 169.695 4.290 -999.990 -999.990 1.697 ..P WKT 2011 02 26 03 14 55 31.3200 -97.3300 251.000 30.0 162.630 4.120 -999.990 -999.990 1.626 ..P WKT 2011 02 26 03 19 55 31.3200 -97.3300 251.000 122.0 161.149 4.120 -999.990 -999.990 1.611 ..P WKT 2011 02 26 03 24 55 31.3200 -97.3300 251.000 457.0 162.372 4.100 -999.990 -999.990 1.624 ..P WKT 2011 02 26 03 29 55 31.3200 -97.3300 251.000 30.0 164.439 3.650 -999.990 -999.990 1.644 ..P WKT 2011 02 26 03 34 55 31.3200 -97.3300 251.000 122.0 155.528 3.440 -999.990 -999.990 1.555 ..P WKT 2011 02 26 03 39 55 31.3200 -97.3300 251.000 457.0 158.946 3.780 -999.990 -999.990 1.589 ..P WKT 2011 02 26 03 49 55 31.3200 -97.3300 251.000 30.0 154.274 3.070 -999.990 -999.990 1.543 ..P WKT 2011 02 26 03 54 55 31.3200 -97.3300 251.000 122.0 156.317 3.490 -999.990 -999.990 1.563 ..P WKT 2011 02 26 03 59 55 31.3200 -97.3300 251.000 457.0 159.372 3.320 -999.990 -999.990 1.594 ..P WKT 2011 02 26 04 04 55 31.3200 -97.3300 251.000 30.0 165.466 3.950 -999.990 -999.990 1.655 ..P WKT 2011 02 26 04 09 55 31.3200 -97.3300 251.000 122.0 170.039 3.270 -999.990 -999.990 1.700 ..P WKT 2011 02 26 04 14 55 31.3200 -97.3300 251.000 457.0 166.342 3.710 -999.990 -999.990 1.663 ..P WKT 2011 02 26 04 24 55 31.3200 -97.3300 251.000 30.0 165.577 3.060 -999.990 -999.990 1.656 ..P WKT 2011 02 26 04 29 55 31.3200 -97.3300 251.000 122.0 168.341 3.080 -999.990 -999.990 1.683 ..P WKT 2011 02 26 04 34 55 31.3200 -97.3300 251.000 457.0 165.537 4.140 -999.990 -999.990 1.655 ..P WKT 2011 02 26 04 39 55 31.3200 -97.3300 251.000 30.0 163.070 4.490 -999.990 -999.990 1.631 ..P WKT 2011 02 26 04 44 55 31.3200 -97.3300 251.000 122.0 175.113 3.930 -999.990 -999.990 1.751 ..P WKT 2011 02 26 04 49 55 31.3200 -97.3300 251.000 457.0 168.934 2.950 -999.990 -999.990 1.689 ..P WKT 2011 02 26 05 04 55 31.3200 -97.3300 251.000 30.0 173.076 3.720 -999.990 -999.990 1.731 ..P WKT 2011 02 26 05 09 55 31.3200 -97.3300 251.000 122.0 183.463 4.540 -999.990 -999.990 1.835 ..P WKT 2011 02 26 05 14 55 31.3200 -97.3300 251.000 457.0 174.624 6.750 -999.990 -999.990 1.746 ..P WKT 2011 02 26 05 19 55 31.3200 -97.3300 251.000 30.0 166.123 4.490 -999.990 -999.990 1.661 ..P WKT 2011 02 26 05 24 55 31.3200 -97.3300 251.000 122.0 164.369 3.410 -999.990 -999.990 1.644 ..P WKT 2011 02 26 05 29 55 31.3200 -97.3300 251.000 457.0 173.067 3.150 -999.990 -999.990 1.731 ..P WKT 2011 02 26 05 39 55 31.3200 -97.3300 251.000 30.0 172.772 3.230 -999.990 -999.990 1.728 ..P WKT 2011 02 26 05 44 55 31.3200 -97.3300 251.000 122.0 163.107 5.250 -999.990 -999.990 1.631 ..P WKT 2011 02 26 05 49 55 31.3200 -97.3300 251.000 457.0 191.871 4.300 -999.990 -999.990 1.919 ..P WKT 2011 02 26 05 54 55 31.3200 -97.3300 251.000 30.0 166.028 3.510 -999.990 -999.990 1.660 ..P WKT 2011 02 26 05 59 55 31.3200 -97.3300 251.000 122.0 161.084 3.580 -999.990 -999.990 1.611 ..P WKT 2011 02 26 06 04 55 31.3200 -97.3300 251.000 457.0 172.318 4.570 -999.990 -999.990 1.723 ..P WKT 2011 02 26 06 14 55 31.3200 -97.3300 251.000 30.0 169.075 3.380 -999.990 -999.990 1.691 ..P WKT 2011 02 26 06 19 55 31.3200 -97.3300 251.000 122.0 164.373 3.620 -999.990 -999.990 1.644 ..P WKT 2011 02 26 06 24 55 31.3200 -97.3300 251.000 457.0 152.260 3.360 -999.990 -999.990 1.523 ..P WKT 2011 02 26 06 29 55 31.3200 -97.3300 251.000 30.0 168.616 3.620 -999.990 -999.990 1.686 ..P WKT 2011 02 26 06 34 55 31.3200 -97.3300 251.000 122.0 153.473 4.000 -999.990 -999.990 1.535 ..P WKT 2011 02 26 06 39 55 31.3200 -97.3300 251.000 457.0 156.185 5.400 -999.990 -999.990 1.562 ..P WKT 2011 02 26 06 49 55 31.3200 -97.3300 251.000 30.0 164.852 4.850 -999.990 -999.990 1.649 ..P WKT 2011 02 26 06 54 55 31.3200 -97.3300 251.000 122.0 171.146 3.580 -999.990 -999.990 1.711 ..P WKT 2011 02 26 06 59 55 31.3200 -97.3300 251.000 457.0 224.578 3.770 -999.990 -999.990 2.246 ..P WKT 2011 02 26 07 04 55 31.3200 -97.3300 251.000 30.0 171.273 2.840 -999.990 -999.990 1.713 ..P WKT 2011 02 26 07 09 55 31.3200 -97.3300 251.000 122.0 164.939 3.020 -999.990 -999.990 1.649 ..P WKT 2011 02 26 07 14 55 31.3200 -97.3300 251.000 457.0 212.636 2.930 -999.990 -999.990 2.126 ..P WKT 2011 02 26 07 24 55 31.3200 -97.3300 251.000 30.0 173.954 2.940 -999.990 -999.990 1.740 ..P WKT 2011 02 26 07 29 55 31.3200 -97.3300 251.000 122.0 170.892 3.110 -999.990 -999.990 1.709 ..P WKT 2011 02 26 07 34 55 31.3200 -97.3300 251.000 457.0 195.929 4.350 -999.990 -999.990 1.959 ..P WKT 2011 02 26 07 39 55 31.3200 -97.3300 251.000 30.0 166.284 4.360 -999.990 -999.990 1.663 ..P WKT 2011 02 26 07 44 55 31.3200 -97.3300 251.000 122.0 189.467 6.520 -999.990 -999.990 1.895 ..P WKT 2011 02 26 07 49 55 31.3200 -97.3300 251.000 457.0 196.498 6.100 -999.990 -999.990 1.965 ..P WKT 2011 02 26 07 59 55 31.3200 -97.3300 251.000 30.0 174.731 4.990 -999.990 -999.990 1.747 ..P WKT 2011 02 26 08 04 55 31.3200 -97.3300 251.000 122.0 193.198 4.460 -999.990 -999.990 1.932 ..P WKT 2011 02 26 08 09 55 31.3200 -97.3300 251.000 457.0 155.158 3.990 -999.990 -999.990 1.552 ..P WKT 2011 02 26 08 14 55 31.3200 -97.3300 251.000 30.0 167.905 5.480 -999.990 -999.990 1.679 ..P WKT 2011 02 26 08 19 55 31.3200 -97.3300 251.000 122.0 184.350 5.410 -999.990 -999.990 1.843 ..P WKT 2011 02 26 08 24 55 31.3200 -97.3300 251.000 457.0 148.002 3.200 -999.990 -999.990 1.480 ..P WKT 2011 02 26 08 34 55 31.3200 -97.3300 251.000 30.0 173.730 3.760 -999.990 -999.990 1.737 ..P WKT 2011 02 26 08 39 55 31.3200 -97.3300 251.000 122.0 174.273 4.580 -999.990 -999.990 1.743 ..P WKT 2011 02 26 08 44 55 31.3200 -97.3300 251.000 457.0 148.262 4.080 -999.990 -999.990 1.483 ..P WKT 2011 02 26 08 49 55 31.3200 -97.3300 251.000 30.0 172.334 3.400 -999.990 -999.990 1.723 ..P WKT 2011 02 26 08 54 55 31.3200 -97.3300 251.000 122.0 181.616 4.200 -999.990 -999.990 1.816 ..P WKT 2011 02 26 08 59 55 31.3200 -97.3300 251.000 457.0 129.062 3.190 -999.990 -999.990 1.291 ..P WKT 2011 02 26 09 09 55 31.3200 -97.3300 251.000 30.0 175.419 5.600 -999.990 -999.990 1.754 ..P WKT 2011 02 26 09 14 55 31.3200 -97.3300 251.000 122.0 186.281 3.400 -999.990 -999.990 1.863 ..P WKT 2011 02 26 09 19 55 31.3200 -97.3300 251.000 457.0 125.585 2.550 -999.990 -999.990 1.256 ..P WKT 2011 02 26 09 24 55 31.3200 -97.3300 251.000 30.0 166.009 3.510 -999.990 -999.990 1.660 ..P WKT 2011 02 26 09 29 55 31.3200 -97.3300 251.000 122.0 191.649 2.960 -999.990 -999.990 1.916 ..P WKT 2011 02 26 09 34 55 31.3200 -97.3300 251.000 457.0 127.610 4.210 -999.990 -999.990 1.276 ..P WKT 2011 02 26 09 44 55 31.3200 -97.3300 251.000 30.0 176.003 2.460 -999.990 -999.990 1.760 ..P WKT 2011 02 26 09 49 55 31.3200 -97.3300 251.000 122.0 189.352 4.300 -999.990 -999.990 1.894 ..P WKT 2011 02 26 09 54 55 31.3200 -97.3300 251.000 457.0 130.514 2.710 -999.990 -999.990 1.305 ..P WKT 2011 02 26 09 59 55 31.3200 -97.3300 251.000 30.0 172.401 1.980 -999.990 -999.990 1.724 ..P WKT 2011 02 26 10 04 55 31.3200 -97.3300 251.000 122.0 201.861 2.350 -999.990 -999.990 2.019 ..P WKT 2011 02 26 10 09 55 31.3200 -97.3300 251.000 457.0 129.946 1.530 -999.990 -999.990 1.299 ..P WKT 2011 02 26 10 19 55 31.3200 -97.3300 251.000 30.0 172.532 3.140 -999.990 -999.990 1.725 ..P WKT 2011 02 26 10 24 55 31.3200 -97.3300 251.000 122.0 209.486 2.870 -999.990 -999.990 2.095 ..P WKT 2011 02 26 10 29 55 31.3200 -97.3300 251.000 457.0 133.518 2.370 -999.990 -999.990 1.335 ..P WKT 2011 02 26 10 34 55 31.3200 -97.3300 251.000 30.0 180.198 5.720 -999.990 -999.990 1.802 ..P WKT 2011 02 26 10 39 55 31.3200 -97.3300 251.000 122.0 220.497 2.930 -999.990 -999.990 2.205 ..P WKT 2011 02 26 10 44 55 31.3200 -97.3300 251.000 457.0 129.787 2.610 -999.990 -999.990 1.298 ..P WKT 2011 02 26 10 54 55 31.3200 -97.3300 251.000 30.0 184.281 3.090 -999.990 -999.990 1.843 ..P WKT 2011 02 26 10 59 55 31.3200 -97.3300 251.000 122.0 218.767 2.890 -999.990 -999.990 2.188 ..P WKT 2011 02 26 11 04 55 31.3200 -97.3300 251.000 457.0 129.167 2.600 -999.990 -999.990 1.292 ..P WKT 2011 02 26 11 09 55 31.3200 -97.3300 251.000 30.0 197.352 2.680 -999.990 -999.990 1.974 ..P WKT 2011 02 26 11 14 55 31.3200 -97.3300 251.000 122.0 207.688 3.200 -999.990 -999.990 2.077 ..P WKT 2011 02 26 11 19 55 31.3200 -97.3300 251.000 457.0 133.701 2.300 -999.990 -999.990 1.337 ..P WKT 2011 02 26 11 29 55 31.3200 -97.3300 251.000 30.0 188.138 4.000 -999.990 -999.990 1.881 ..P WKT 2011 02 26 11 34 55 31.3200 -97.3300 251.000 122.0 198.208 2.910 -999.990 -999.990 1.982 ..P WKT 2011 02 26 11 39 55 31.3200 -97.3300 251.000 457.0 127.167 2.890 -999.990 -999.990 1.272 ..P WKT 2011 02 26 11 44 55 31.3200 -97.3300 251.000 30.0 203.595 4.030 -999.990 -999.990 2.036 ..P WKT 2011 02 26 11 49 55 31.3200 -97.3300 251.000 122.0 168.756 3.610 -999.990 -999.990 1.688 ..P WKT 2011 02 26 12 09 55 31.3200 -97.3300 251.000 457.0 135.570 2.530 -999.990 -999.990 1.356 ..P WKT 2011 02 26 12 10 25 31.3200 -97.3300 251.000 457.0 133.297 2.630 -999.990 -999.990 1.333 ..P WKT 2011 02 26 12 10 55 31.3200 -97.3300 251.000 457.0 137.558 3.970 -999.990 -999.990 1.376 ..P WKT 2011 02 26 12 11 25 31.3200 -97.3300 251.000 457.0 138.803 3.160 -999.990 -999.990 1.388 ..P WKT 2011 02 26 12 11 55 31.3200 -97.3300 251.000 457.0 137.704 2.560 -999.990 -999.990 1.377 ..P WKT 2011 02 26 12 12 25 31.3200 -97.3300 251.000 457.0 138.111 2.720 -999.990 -999.990 1.381 ..P WKT 2011 02 26 12 12 55 31.3200 -97.3300 251.000 457.0 138.017 2.910 -999.990 -999.990 1.380 ..P WKT 2011 02 26 12 13 25 31.3200 -97.3300 251.000 457.0 134.740 2.820 -999.990 -999.990 1.347 ..P WKT 2011 02 26 12 13 55 31.3200 -97.3300 251.000 457.0 139.168 2.650 -999.990 -999.990 1.392 ..P WKT 2011 02 26 12 14 25 31.3200 -97.3300 251.000 457.0 137.063 2.990 -999.990 -999.990 1.371 ..P WKT 2011 02 26 12 14 55 31.3200 -97.3300 251.000 457.0 137.806 4.070 -999.990 -999.990 1.378 ..P WKT 2011 02 26 12 19 55 31.3200 -97.3300 251.000 30.0 186.096 2.970 -999.990 -999.990 1.861 ..P WKT 2011 02 26 12 24 55 31.3200 -97.3300 251.000 122.0 150.818 2.760 -999.990 -999.990 1.508 ..P WKT 2011 02 26 12 29 55 31.3200 -97.3300 251.000 457.0 137.146 3.230 -999.990 -999.990 1.371 ..P WKT 2011 02 26 12 34 55 31.3200 -97.3300 251.000 30.0 180.732 3.250 -999.990 -999.990 1.807 ..P WKT 2011 02 26 12 39 55 31.3200 -97.3300 251.000 122.0 149.987 2.590 -999.990 -999.990 1.500 ..P WKT 2011 02 26 12 44 55 31.3200 -97.3300 251.000 457.0 147.032 3.460 -999.990 -999.990 1.470 ..P WKT 2011 02 26 12 54 55 31.3200 -97.3300 251.000 30.0 182.463 2.340 -999.990 -999.990 1.825 ..P WKT 2011 02 26 12 59 55 31.3200 -97.3300 251.000 122.0 147.557 2.620 -999.990 -999.990 1.476 ..P WKT 2011 02 26 13 04 55 31.3200 -97.3300 251.000 457.0 125.707 3.140 -999.990 -999.990 1.257 ..P WKT 2011 02 26 13 09 55 31.3200 -97.3300 251.000 30.0 182.817 3.050 -999.990 -999.990 1.828 ..P WKT 2011 02 26 13 14 55 31.3200 -97.3300 251.000 122.0 141.232 2.060 -999.990 -999.990 1.412 ..P WKT 2011 02 26 13 19 55 31.3200 -97.3300 251.000 457.0 130.093 1.740 -999.990 -999.990 1.301 ..P WKT 2011 02 26 13 29 55 31.3200 -97.3300 251.000 30.0 173.318 2.360 -999.990 -999.990 1.733 ..P WKT 2011 02 26 13 34 55 31.3200 -97.3300 251.000 122.0 146.084 2.480 -999.990 -999.990 1.461 ..P WKT 2011 02 26 13 39 55 31.3200 -97.3300 251.000 457.0 123.201 2.250 -999.990 -999.990 1.232 ..P WKT 2011 02 26 13 44 55 31.3200 -97.3300 251.000 30.0 174.534 2.970 -999.990 -999.990 1.745 ..P WKT 2011 02 26 13 49 55 31.3200 -97.3300 251.000 122.0 143.632 4.730 -999.990 -999.990 1.436 ..P WKT 2011 02 26 13 54 55 31.3200 -97.3300 251.000 457.0 130.115 2.530 -999.990 -999.990 1.301 ..P WKT 2011 02 26 14 04 55 31.3200 -97.3300 251.000 30.0 177.554 3.310 -999.990 -999.990 1.776 ..P WKT 2011 02 26 14 09 55 31.3200 -97.3300 251.000 122.0 145.616 2.560 -999.990 -999.990 1.456 ..P WKT 2011 02 26 14 14 55 31.3200 -97.3300 251.000 457.0 122.036 2.850 -999.990 -999.990 1.220 ..P WKT 2011 02 26 14 19 55 31.3200 -97.3300 251.000 30.0 175.617 3.190 -999.990 -999.990 1.756 ..P WKT 2011 02 26 14 24 55 31.3200 -97.3300 251.000 122.0 141.686 3.580 -999.990 -999.990 1.417 ..P WKT 2011 02 26 14 29 55 31.3200 -97.3300 251.000 457.0 120.620 3.490 -999.990 -999.990 1.206 ..P WKT 2011 02 26 14 39 55 31.3200 -97.3300 251.000 30.0 176.798 3.950 -999.990 -999.990 1.768 ..P WKT 2011 02 26 14 44 55 31.3200 -97.3300 251.000 122.0 152.039 3.040 -999.990 -999.990 1.520 ..P WKT 2011 02 26 14 49 55 31.3200 -97.3300 251.000 457.0 116.438 3.180 -999.990 -999.990 1.164 ..P WKT 2011 02 26 14 54 55 31.3200 -97.3300 251.000 30.0 170.786 3.630 -999.990 -999.990 1.708 ..P WKT 2011 02 26 14 59 55 31.3200 -97.3300 251.000 122.0 138.196 2.990 -999.990 -999.990 1.382 ..P WKT 2011 02 26 15 04 55 31.3200 -97.3300 251.000 457.0 120.293 2.400 -999.990 -999.990 1.203 ..P WKT 2011 02 26 15 14 55 31.3200 -97.3300 251.000 30.0 165.369 3.690 -999.990 -999.990 1.654 ..P WKT 2011 02 26 15 19 55 31.3200 -97.3300 251.000 122.0 149.780 5.280 -999.990 -999.990 1.498 ..P WKT 2011 02 26 15 24 55 31.3200 -97.3300 251.000 457.0 125.191 4.360 -999.990 -999.990 1.252 ..P WKT 2011 02 26 15 29 55 31.3200 -97.3300 251.000 30.0 161.630 4.000 -999.990 -999.990 1.616 ..P WKT 2011 02 26 15 34 55 31.3200 -97.3300 251.000 122.0 156.883 2.890 -999.990 -999.990 1.569 ..P WKT 2011 02 26 15 39 55 31.3200 -97.3300 251.000 457.0 119.967 4.220 -999.990 -999.990 1.200 ..P WKT 2011 02 26 15 49 55 31.3200 -97.3300 251.000 30.0 167.623 3.120 -999.990 -999.990 1.676 ..P WKT 2011 02 26 15 54 55 31.3200 -97.3300 251.000 122.0 147.858 2.510 -999.990 -999.990 1.479 ..P WKT 2011 02 26 15 59 55 31.3200 -97.3300 251.000 457.0 124.432 2.390 -999.990 -999.990 1.244 ..P WKT 2011 02 26 16 04 55 31.3200 -97.3300 251.000 30.0 161.649 3.460 -999.990 -999.990 1.616 ..P WKT 2011 02 26 16 09 55 31.3200 -97.3300 251.000 122.0 154.551 3.180 -999.990 -999.990 1.546 ..P WKT 2011 02 26 16 14 55 31.3200 -97.3300 251.000 457.0 127.969 2.720 -999.990 -999.990 1.280 ..P WKT 2011 02 26 16 24 55 31.3200 -97.3300 251.000 30.0 163.642 2.870 -999.990 -999.990 1.636 ..P WKT 2011 02 26 16 29 55 31.3200 -97.3300 251.000 122.0 154.620 3.250 -999.990 -999.990 1.546 ..P WKT 2011 02 26 16 34 55 31.3200 -97.3300 251.000 457.0 125.291 3.390 -999.990 -999.990 1.253 ..P WKT 2011 02 26 16 39 55 31.3200 -97.3300 251.000 30.0 167.875 3.810 -999.990 -999.990 1.679 ..P WKT 2011 02 26 16 44 55 31.3200 -97.3300 251.000 122.0 159.855 3.280 -999.990 -999.990 1.599 ..P WKT 2011 02 26 16 49 55 31.3200 -97.3300 251.000 457.0 123.880 2.830 -999.990 -999.990 1.239 ..P WKT 2011 02 26 17 04 55 31.3200 -97.3300 251.000 30.0 171.911 3.650 -999.990 -999.990 1.719 ..P WKT 2011 02 26 17 09 55 31.3200 -97.3300 251.000 122.0 180.462 3.100 -999.990 -999.990 1.805 ..P WKT 2011 02 26 17 14 55 31.3200 -97.3300 251.000 457.0 124.484 3.030 -999.990 -999.990 1.245 ..P WKT 2011 02 26 17 19 55 31.3200 -97.3300 251.000 30.0 179.932 3.040 -999.990 -999.990 1.799 ..P WKT 2011 02 26 17 24 55 31.3200 -97.3300 251.000 122.0 162.209 3.850 -999.990 -999.990 1.622 ..P WKT 2011 02 26 17 29 55 31.3200 -97.3300 251.000 457.0 119.554 2.870 -999.990 -999.990 1.196 ..P WKT 2011 02 26 17 39 55 31.3200 -97.3300 251.000 30.0 165.381 6.170 -999.990 -999.990 1.654 ..P WKT 2011 02 26 17 44 55 31.3200 -97.3300 251.000 122.0 160.767 3.020 -999.990 -999.990 1.608 ..P WKT 2011 02 26 17 49 55 31.3200 -97.3300 251.000 457.0 123.253 3.160 -999.990 -999.990 1.233 ..P WKT 2011 02 26 17 54 55 31.3200 -97.3300 251.000 30.0 162.176 4.140 -999.990 -999.990 1.622 ..P WKT 2011 02 26 17 59 55 31.3200 -97.3300 251.000 122.0 163.877 4.040 -999.990 -999.990 1.639 ..P WKT 2011 02 26 18 04 55 31.3200 -97.3300 251.000 457.0 122.059 4.470 -999.990 -999.990 1.221 ..P WKT 2011 02 26 18 14 55 31.3200 -97.3300 251.000 30.0 167.366 4.270 -999.990 -999.990 1.674 ..P WKT 2011 02 26 18 19 55 31.3200 -97.3300 251.000 122.0 163.965 5.030 -999.990 -999.990 1.640 ..P WKT 2011 02 26 18 24 55 31.3200 -97.3300 251.000 457.0 132.508 3.850 -999.990 -999.990 1.325 ..P WKT 2011 02 26 18 29 55 31.3200 -97.3300 251.000 30.0 163.808 3.780 -999.990 -999.990 1.638 ..P WKT 2011 02 26 18 34 55 31.3200 -97.3300 251.000 122.0 159.414 3.150 -999.990 -999.990 1.594 ..P WKT 2011 02 26 18 39 55 31.3200 -97.3300 251.000 457.0 124.151 3.260 -999.990 -999.990 1.242 ..P WKT 2011 02 26 18 49 55 31.3200 -97.3300 251.000 30.0 165.105 3.330 -999.990 -999.990 1.651 ..P WKT 2011 02 26 18 54 55 31.3200 -97.3300 251.000 122.0 153.033 3.190 -999.990 -999.990 1.530 ..P WKT 2011 02 26 18 59 55 31.3200 -97.3300 251.000 457.0 127.860 3.990 -999.990 -999.990 1.279 ..P WKT 2011 02 26 19 04 55 31.3200 -97.3300 251.000 30.0 167.712 4.610 -999.990 -999.990 1.677 ..P WKT 2011 02 26 19 09 55 31.3200 -97.3300 251.000 122.0 162.609 4.120 -999.990 -999.990 1.626 ..P WKT 2011 02 26 19 14 55 31.3200 -97.3300 251.000 457.0 131.807 3.930 -999.990 -999.990 1.318 ..P WKT 2011 02 26 19 24 55 31.3200 -97.3300 251.000 30.0 163.985 3.950 -999.990 -999.990 1.640 ..P WKT 2011 02 26 19 29 55 31.3200 -97.3300 251.000 122.0 158.649 3.980 -999.990 -999.990 1.586 ..P WKT 2011 02 26 19 34 55 31.3200 -97.3300 251.000 457.0 127.460 4.550 -999.990 -999.990 1.275 ..P WKT 2011 02 26 19 39 55 31.3200 -97.3300 251.000 30.0 152.788 4.580 -999.990 -999.990 1.528 ..P WKT 2011 02 26 19 44 55 31.3200 -97.3300 251.000 122.0 148.284 4.680 -999.990 -999.990 1.483 ..P WKT 2011 02 26 19 49 55 31.3200 -97.3300 251.000 457.0 132.184 4.320 -999.990 -999.990 1.322 ..P WKT 2011 02 26 19 59 55 31.3200 -97.3300 251.000 30.0 149.687 4.000 -999.990 -999.990 1.497 ..P WKT 2011 02 26 20 04 55 31.3200 -97.3300 251.000 122.0 149.657 4.110 -999.990 -999.990 1.497 ..P WKT 2011 02 26 20 09 55 31.3200 -97.3300 251.000 457.0 127.439 3.910 -999.990 -999.990 1.274 ..P WKT 2011 02 26 20 14 55 31.3200 -97.3300 251.000 30.0 147.115 4.470 -999.990 -999.990 1.471 ..P WKT 2011 02 26 20 19 55 31.3200 -97.3300 251.000 122.0 145.595 3.620 -999.990 -999.990 1.456 ..P WKT 2011 02 26 20 24 55 31.3200 -97.3300 251.000 457.0 126.530 4.000 -999.990 -999.990 1.265 ..P WKT 2011 02 26 20 34 55 31.3200 -97.3300 251.000 30.0 142.175 3.230 -999.990 -999.990 1.422 ..P WKT 2011 02 26 20 39 55 31.3200 -97.3300 251.000 122.0 144.440 4.360 -999.990 -999.990 1.444 ..P WKT 2011 02 26 20 44 55 31.3200 -97.3300 251.000 457.0 137.107 3.660 -999.990 -999.990 1.371 ..P WKT 2011 02 26 20 49 55 31.3200 -97.3300 251.000 30.0 146.651 4.420 -999.990 -999.990 1.467 ..P WKT 2011 02 26 20 54 55 31.3200 -97.3300 251.000 122.0 151.560 3.950 -999.990 -999.990 1.516 ..P WKT 2011 02 26 20 59 55 31.3200 -97.3300 251.000 457.0 143.238 3.780 -999.990 -999.990 1.432 ..P WKT 2011 02 26 21 09 55 31.3200 -97.3300 251.000 30.0 142.140 4.360 -999.990 -999.990 1.421 ..P WKT 2011 02 26 21 14 55 31.3200 -97.3300 251.000 122.0 143.080 4.170 -999.990 -999.990 1.431 ..P WKT 2011 02 26 21 19 55 31.3200 -97.3300 251.000 457.0 138.730 4.480 -999.990 -999.990 1.387 ..P WKT 2011 02 26 21 24 55 31.3200 -97.3300 251.000 30.0 139.009 4.650 -999.990 -999.990 1.390 ..P WKT 2011 02 26 21 29 55 31.3200 -97.3300 251.000 122.0 135.652 4.980 -999.990 -999.990 1.357 ..P WKT 2011 02 26 21 34 55 31.3200 -97.3300 251.000 457.0 125.686 4.810 -999.990 -999.990 1.257 ..P WKT 2011 02 26 21 44 55 31.3200 -97.3300 251.000 30.0 133.351 4.740 -999.990 -999.990 1.334 ..P WKT 2011 02 26 21 49 55 31.3200 -97.3300 251.000 122.0 135.117 4.670 -999.990 -999.990 1.351 ..P WKT 2011 02 26 21 54 55 31.3200 -97.3300 251.000 457.0 134.239 5.350 -999.990 -999.990 1.342 ..P WKT 2011 02 26 21 59 55 31.3200 -97.3300 251.000 30.0 132.041 4.360 -999.990 -999.990 1.320 ..P WKT 2011 02 26 22 04 55 31.3200 -97.3300 251.000 122.0 142.723 5.900 -999.990 -999.990 1.427 ..P WKT 2011 02 26 22 09 55 31.3200 -97.3300 251.000 457.0 131.940 4.250 -999.990 -999.990 1.319 ..P WKT 2011 02 26 22 19 55 31.3200 -97.3300 251.000 30.0 137.662 4.280 -999.990 -999.990 1.377 ..P WKT 2011 02 26 22 24 55 31.3200 -97.3300 251.000 122.0 142.114 4.500 -999.990 -999.990 1.421 ..P WKT 2011 02 26 22 29 55 31.3200 -97.3300 251.000 457.0 134.354 4.200 -999.990 -999.990 1.344 ..P WKT 2011 02 26 22 34 55 31.3200 -97.3300 251.000 30.0 136.990 4.970 -999.990 -999.990 1.370 ..P WKT 2011 02 26 22 39 55 31.3200 -97.3300 251.000 122.0 135.666 5.010 -999.990 -999.990 1.357 ..P WKT 2011 02 26 22 44 55 31.3200 -97.3300 251.000 457.0 135.827 4.700 -999.990 -999.990 1.358 ..P WKT 2011 02 26 22 54 55 31.3200 -97.3300 251.000 30.0 142.486 4.700 -999.990 -999.990 1.425 ..P WKT 2011 02 26 22 59 55 31.3200 -97.3300 251.000 122.0 139.089 4.990 -999.990 -999.990 1.391 ..P WKT 2011 02 26 23 04 55 31.3200 -97.3300 251.000 457.0 134.044 6.120 -999.990 -999.990 1.340 ..P WKT 2011 02 26 23 09 55 31.3200 -97.3300 251.000 30.0 142.847 5.170 -999.990 -999.990 1.428 ..P WKT 2011 02 26 23 14 55 31.3200 -97.3300 251.000 122.0 142.254 4.570 -999.990 -999.990 1.423 ..P WKT 2011 02 26 23 19 55 31.3200 -97.3300 251.000 457.0 135.728 4.660 -999.990 -999.990 1.357 ..P WKT 2011 02 26 23 29 55 31.3200 -97.3300 251.000 30.0 135.229 4.970 -999.990 -999.990 1.352 ..P WKT 2011 02 26 23 34 55 31.3200 -97.3300 251.000 122.0 134.168 4.390 -999.990 -999.990 1.342 ..P WKT 2011 02 26 23 39 55 31.3200 -97.3300 251.000 457.0 124.214 5.150 -999.990 -999.990 1.242 ..P WKT 2011 02 26 23 44 55 31.3200 -97.3300 251.000 30.0 140.943 4.500 -999.990 -999.990 1.409 ..P WKT 2011 02 26 23 49 55 31.3200 -97.3300 251.000 122.0 138.894 5.080 -999.990 -999.990 1.389 ..P WKT 2011 02 27 00 09 55 31.3200 -97.3300 251.000 457.0 133.593 4.680 -999.990 -999.990 1.336 ..P WKT 2011 02 27 00 10 25 31.3200 -97.3300 251.000 457.0 130.140 4.610 -999.990 -999.990 1.301 ..P WKT 2011 02 27 00 10 55 31.3200 -97.3300 251.000 457.0 132.780 4.320 -999.990 -999.990 1.328 ..P WKT 2011 02 27 00 11 25 31.3200 -97.3300 251.000 457.0 135.089 4.530 -999.990 -999.990 1.351 ..P WKT 2011 02 27 00 11 55 31.3200 -97.3300 251.000 457.0 135.917 4.800 -999.990 -999.990 1.359 ..P WKT 2011 02 27 00 12 25 31.3200 -97.3300 251.000 457.0 129.336 4.650 -999.990 -999.990 1.293 ..P WKT 2011 02 27 00 12 55 31.3200 -97.3300 251.000 457.0 129.011 4.470 -999.990 -999.990 1.290 ..P WKT 2011 02 27 00 13 25 31.3200 -97.3300 251.000 457.0 129.840 4.630 -999.990 -999.990 1.298 ..P WKT 2011 02 27 00 13 55 31.3200 -97.3300 251.000 457.0 134.455 4.650 -999.990 -999.990 1.345 ..P WKT 2011 02 27 00 14 25 31.3200 -97.3300 251.000 457.0 133.143 4.840 -999.990 -999.990 1.331 ..P WKT 2011 02 27 00 14 55 31.3200 -97.3300 251.000 457.0 133.476 4.450 -999.990 -999.990 1.335 ..P WKT 2011 02 27 00 19 55 31.3200 -97.3300 251.000 30.0 150.321 4.920 -999.990 -999.990 1.503 ..P WKT 2011 02 27 00 24 55 31.3200 -97.3300 251.000 122.0 149.713 4.600 -999.990 -999.990 1.497 ..P WKT 2011 02 27 00 29 55 31.3200 -97.3300 251.000 457.0 126.376 4.680 -999.990 -999.990 1.264 ..P WKT 2011 02 27 00 34 55 31.3200 -97.3300 251.000 30.0 150.143 5.620 -999.990 -999.990 1.501 ..P WKT 2011 02 27 00 39 55 31.3200 -97.3300 251.000 122.0 152.170 5.020 -999.990 -999.990 1.522 ..P WKT 2011 02 27 00 44 55 31.3200 -97.3300 251.000 457.0 130.474 5.240 -999.990 -999.990 1.305 ..P WKT 2011 02 27 00 54 55 31.3200 -97.3300 251.000 30.0 150.466 5.380 -999.990 -999.990 1.505 ..P WKT 2011 02 27 00 59 55 31.3200 -97.3300 251.000 122.0 146.025 5.230 -999.990 -999.990 1.460 ..P WKT 2011 02 27 01 04 55 31.3200 -97.3300 251.000 457.0 135.320 4.800 -999.990 -999.990 1.353 ..P WKT 2011 02 27 01 09 55 31.3200 -97.3300 251.000 30.0 148.019 4.970 -999.990 -999.990 1.480 ..P WKT 2011 02 27 01 14 55 31.3200 -97.3300 251.000 122.0 148.191 4.720 -999.990 -999.990 1.482 ..P WKT 2011 02 27 01 19 55 31.3200 -97.3300 251.000 457.0 134.517 4.460 -999.990 -999.990 1.345 ..P WKT 2011 02 27 01 29 55 31.3200 -97.3300 251.000 30.0 150.453 4.790 -999.990 -999.990 1.505 ..P WKT 2011 02 27 01 34 55 31.3200 -97.3300 251.000 122.0 150.720 4.670 -999.990 -999.990 1.507 ..P WKT 2011 02 27 01 39 55 31.3200 -97.3300 251.000 457.0 128.231 4.470 -999.990 -999.990 1.282 ..P WKT 2011 02 27 01 44 55 31.3200 -97.3300 251.000 30.0 153.894 4.890 -999.990 -999.990 1.539 ..P WKT 2011 02 27 01 49 55 31.3200 -97.3300 251.000 122.0 154.491 4.510 -999.990 -999.990 1.545 ..P WKT 2011 02 27 01 54 55 31.3200 -97.3300 251.000 457.0 127.709 4.840 -999.990 -999.990 1.277 ..P WKT 2011 02 27 02 04 55 31.3200 -97.3300 251.000 30.0 152.608 5.070 -999.990 -999.990 1.526 ..P WKT 2011 02 27 02 09 55 31.3200 -97.3300 251.000 122.0 153.819 4.780 -999.990 -999.990 1.538 ..P WKT 2011 02 27 02 14 55 31.3200 -97.3300 251.000 457.0 128.464 4.430 -999.990 -999.990 1.285 ..P WKT 2011 02 27 02 19 55 31.3200 -97.3300 251.000 30.0 146.505 4.710 -999.990 -999.990 1.465 ..P WKT 2011 02 27 02 24 55 31.3200 -97.3300 251.000 122.0 146.395 4.840 -999.990 -999.990 1.464 ..P WKT 2011 02 27 02 29 55 31.3200 -97.3300 251.000 457.0 125.654 4.900 -999.990 -999.990 1.257 ..P WKT 2011 02 27 02 39 55 31.3200 -97.3300 251.000 30.0 141.915 3.900 -999.990 -999.990 1.419 ..P WKT 2011 02 27 02 44 55 31.3200 -97.3300 251.000 122.0 140.625 4.020 -999.990 -999.990 1.406 ..P WKT 2011 02 27 02 49 55 31.3200 -97.3300 251.000 457.0 123.485 4.010 -999.990 -999.990 1.235 ..P WKT 2011 02 27 02 54 55 31.3200 -97.3300 251.000 30.0 140.852 4.480 -999.990 -999.990 1.409 ..P WKT 2011 02 27 02 59 55 31.3200 -97.3300 251.000 122.0 140.883 4.340 -999.990 -999.990 1.409 ..P WKT 2011 02 27 03 04 55 31.3200 -97.3300 251.000 457.0 125.721 4.060 -999.990 -999.990 1.257 ..P WKT 2011 02 27 03 14 55 31.3200 -97.3300 251.000 30.0 143.359 4.150 -999.990 -999.990 1.434 ..P WKT 2011 02 27 03 19 55 31.3200 -97.3300 251.000 122.0 139.497 4.150 -999.990 -999.990 1.395 ..P WKT 2011 02 27 03 24 55 31.3200 -97.3300 251.000 457.0 153.971 5.000 -999.990 -999.990 1.540 ..P WKT 2011 02 27 03 29 55 31.3200 -97.3300 251.000 30.0 141.517 4.650 -999.990 -999.990 1.415 ..P WKT 2011 02 27 03 34 55 31.3200 -97.3300 251.000 122.0 139.967 4.420 -999.990 -999.990 1.400 ..P WKT 2011 02 27 03 39 55 31.3200 -97.3300 251.000 457.0 134.285 4.670 -999.990 -999.990 1.343 ..P WKT 2011 02 27 03 49 55 31.3200 -97.3300 251.000 30.0 146.341 3.870 -999.990 -999.990 1.463 ..P WKT 2011 02 27 03 54 55 31.3200 -97.3300 251.000 122.0 142.594 4.060 -999.990 -999.990 1.426 ..P WKT 2011 02 27 03 59 55 31.3200 -97.3300 251.000 457.0 121.656 3.990 -999.990 -999.990 1.217 ..P WKT 2011 02 27 04 04 55 31.3200 -97.3300 251.000 30.0 145.514 4.660 -999.990 -999.990 1.455 ..P WKT 2011 02 27 04 09 55 31.3200 -97.3300 251.000 122.0 147.884 4.380 -999.990 -999.990 1.479 ..P WKT 2011 02 27 04 14 55 31.3200 -97.3300 251.000 457.0 123.633 4.110 -999.990 -999.990 1.236 ..P WKT 2011 02 27 04 24 55 31.3200 -97.3300 251.000 30.0 143.915 4.260 -999.990 -999.990 1.439 ..P WKT 2011 02 27 04 29 55 31.3200 -97.3300 251.000 122.0 146.451 5.420 -999.990 -999.990 1.465 ..P WKT 2011 02 27 04 34 55 31.3200 -97.3300 251.000 457.0 114.585 4.300 -999.990 -999.990 1.146 ..P WKT 2011 02 27 04 39 55 31.3200 -97.3300 251.000 30.0 140.607 4.830 -999.990 -999.990 1.406 ..P WKT 2011 02 27 04 44 55 31.3200 -97.3300 251.000 122.0 141.158 4.330 -999.990 -999.990 1.412 ..P WKT 2011 02 27 04 49 55 31.3200 -97.3300 251.000 457.0 113.253 4.940 -999.990 -999.990 1.133 ..P WKT 2011 02 27 05 04 55 31.3200 -97.3300 251.000 30.0 146.625 3.900 -999.990 -999.990 1.466 ..P WKT 2011 02 27 05 09 55 31.3200 -97.3300 251.000 122.0 139.871 3.780 -999.990 -999.990 1.399 ..P WKT 2011 02 27 05 14 55 31.3200 -97.3300 251.000 457.0 119.544 3.810 -999.990 -999.990 1.195 ..P WKT 2011 02 27 05 19 55 31.3200 -97.3300 251.000 30.0 138.941 3.700 -999.990 -999.990 1.389 ..P WKT 2011 02 27 05 24 55 31.3200 -97.3300 251.000 122.0 134.502 4.540 -999.990 -999.990 1.345 ..P WKT 2011 02 27 05 29 55 31.3200 -97.3300 251.000 457.0 120.129 4.160 -999.990 -999.990 1.201 ..P WKT 2011 02 27 05 39 55 31.3200 -97.3300 251.000 30.0 129.531 3.380 -999.990 -999.990 1.295 ..P WKT 2011 02 27 05 44 55 31.3200 -97.3300 251.000 122.0 133.110 3.450 -999.990 -999.990 1.331 ..P WKT 2011 02 27 05 49 55 31.3200 -97.3300 251.000 457.0 116.153 4.230 -999.990 -999.990 1.162 ..P WKT 2011 02 27 05 54 55 31.3200 -97.3300 251.000 30.0 126.688 3.750 -999.990 -999.990 1.267 ..P WKT 2011 02 27 05 59 55 31.3200 -97.3300 251.000 122.0 128.610 3.750 -999.990 -999.990 1.286 ..P WKT 2011 02 27 06 04 55 31.3200 -97.3300 251.000 457.0 121.589 4.430 -999.990 -999.990 1.216 ..P WKT 2011 02 27 06 14 55 31.3200 -97.3300 251.000 30.0 115.967 4.760 -999.990 -999.990 1.160 ..P WKT 2011 02 27 06 19 55 31.3200 -97.3300 251.000 122.0 121.015 4.700 -999.990 -999.990 1.210 ..P WKT 2011 02 27 06 24 55 31.3200 -97.3300 251.000 457.0 122.749 4.100 -999.990 -999.990 1.227 ..P WKT 2011 02 27 06 29 55 31.3200 -97.3300 251.000 30.0 122.162 5.080 -999.990 -999.990 1.222 ..P WKT 2011 02 27 06 34 55 31.3200 -97.3300 251.000 122.0 109.974 4.440 -999.990 -999.990 1.100 ..P WKT 2011 02 27 06 39 55 31.3200 -97.3300 251.000 457.0 116.349 4.130 -999.990 -999.990 1.163 ..P WKT 2011 02 27 06 49 55 31.3200 -97.3300 251.000 30.0 113.021 4.220 -999.990 -999.990 1.130 ..P WKT 2011 02 27 06 54 55 31.3200 -97.3300 251.000 122.0 116.910 4.050 -999.990 -999.990 1.169 ..P WKT 2011 02 27 06 59 55 31.3200 -97.3300 251.000 457.0 118.811 4.160 -999.990 -999.990 1.188 ..P WKT 2011 02 27 07 04 55 31.3200 -97.3300 251.000 30.0 118.224 4.540 -999.990 -999.990 1.182 ..P WKT 2011 02 27 07 09 55 31.3200 -97.3300 251.000 122.0 119.794 3.960 -999.990 -999.990 1.198 ..P WKT 2011 02 27 07 14 55 31.3200 -97.3300 251.000 457.0 124.016 3.480 -999.990 -999.990 1.240 ..P WKT 2011 02 27 07 24 55 31.3200 -97.3300 251.000 30.0 116.730 3.700 -999.990 -999.990 1.167 ..P WKT 2011 02 27 07 29 55 31.3200 -97.3300 251.000 122.0 121.475 5.510 -999.990 -999.990 1.215 ..P WKT 2011 02 27 07 34 55 31.3200 -97.3300 251.000 457.0 127.051 5.920 -999.990 -999.990 1.271 ..P WKT 2011 02 27 07 39 55 31.3200 -97.3300 251.000 30.0 125.659 4.430 -999.990 -999.990 1.257 ..P WKT 2011 02 27 07 44 55 31.3200 -97.3300 251.000 122.0 118.624 3.770 -999.990 -999.990 1.186 ..P WKT 2011 02 27 07 49 55 31.3200 -97.3300 251.000 457.0 126.193 3.690 -999.990 -999.990 1.262 ..P WKT 2011 02 27 07 59 55 31.3200 -97.3300 251.000 30.0 123.218 3.910 -999.990 -999.990 1.232 ..P WKT 2011 02 27 08 04 55 31.3200 -97.3300 251.000 122.0 129.436 4.910 -999.990 -999.990 1.294 ..P WKT 2011 02 27 08 09 55 31.3200 -97.3300 251.000 457.0 120.716 5.260 -999.990 -999.990 1.207 ..P WKT 2011 02 27 08 14 55 31.3200 -97.3300 251.000 30.0 118.966 3.920 -999.990 -999.990 1.190 ..P WKT 2011 02 27 08 19 55 31.3200 -97.3300 251.000 122.0 120.205 4.550 -999.990 -999.990 1.202 ..P WKT 2011 02 27 08 24 55 31.3200 -97.3300 251.000 457.0 115.134 3.890 -999.990 -999.990 1.151 ..P WKT 2011 02 27 08 34 55 31.3200 -97.3300 251.000 30.0 112.038 3.530 -999.990 -999.990 1.120 ..P WKT 2011 02 27 08 39 55 31.3200 -97.3300 251.000 122.0 122.981 3.570 -999.990 -999.990 1.230 ..P WKT 2011 02 27 08 44 55 31.3200 -97.3300 251.000 457.0 115.655 3.100 -999.990 -999.990 1.157 ..P WKT 2011 02 27 08 49 55 31.3200 -97.3300 251.000 30.0 120.952 3.880 -999.990 -999.990 1.210 ..P WKT 2011 02 27 08 54 55 31.3200 -97.3300 251.000 122.0 113.957 3.150 -999.990 -999.990 1.140 ..P WKT 2011 02 27 08 59 55 31.3200 -97.3300 251.000 457.0 118.922 3.100 -999.990 -999.990 1.189 ..P WKT 2011 02 27 09 09 55 31.3200 -97.3300 251.000 30.0 117.035 2.780 -999.990 -999.990 1.170 ..P WKT 2011 02 27 09 14 55 31.3200 -97.3300 251.000 122.0 121.148 2.690 -999.990 -999.990 1.211 ..P WKT 2011 02 27 09 19 55 31.3200 -97.3300 251.000 457.0 120.940 3.470 -999.990 -999.990 1.209 ..P WKT 2011 02 27 09 24 55 31.3200 -97.3300 251.000 30.0 111.757 3.900 -999.990 -999.990 1.118 ..P WKT 2011 02 27 09 29 55 31.3200 -97.3300 251.000 122.0 114.872 3.120 -999.990 -999.990 1.149 ..P WKT 2011 02 27 09 34 55 31.3200 -97.3300 251.000 457.0 121.979 2.900 -999.990 -999.990 1.220 ..P WKT 2011 02 27 09 44 55 31.3200 -97.3300 251.000 30.0 122.964 2.630 -999.990 -999.990 1.230 ..P WKT 2011 02 27 09 49 55 31.3200 -97.3300 251.000 122.0 112.185 4.320 -999.990 -999.990 1.122 ..P WKT 2011 02 27 09 54 55 31.3200 -97.3300 251.000 457.0 123.024 3.810 -999.990 -999.990 1.230 ..P WKT 2011 02 27 09 59 55 31.3200 -97.3300 251.000 30.0 106.089 3.650 -999.990 -999.990 1.061 ..P WKT 2011 02 27 10 04 55 31.3200 -97.3300 251.000 122.0 112.937 3.570 -999.990 -999.990 1.129 ..P WKT 2011 02 27 10 09 55 31.3200 -97.3300 251.000 457.0 123.944 4.110 -999.990 -999.990 1.239 ..P WKT 2011 02 27 10 19 55 31.3200 -97.3300 251.000 30.0 109.150 3.020 -999.990 -999.990 1.092 ..P WKT 2011 02 27 10 24 55 31.3200 -97.3300 251.000 122.0 109.297 3.780 -999.990 -999.990 1.093 ..P WKT 2011 02 27 10 29 55 31.3200 -97.3300 251.000 457.0 124.753 3.670 -999.990 -999.990 1.248 ..P WKT 2011 02 27 10 34 55 31.3200 -97.3300 251.000 30.0 111.589 3.420 -999.990 -999.990 1.116 ..P WKT 2011 02 27 10 39 55 31.3200 -97.3300 251.000 122.0 115.731 3.400 -999.990 -999.990 1.157 ..P WKT 2011 02 27 10 44 55 31.3200 -97.3300 251.000 457.0 123.036 3.750 -999.990 -999.990 1.230 ..P WKT 2011 02 27 10 54 55 31.3200 -97.3300 251.000 30.0 110.230 3.230 -999.990 -999.990 1.102 ..P WKT 2011 02 27 10 59 55 31.3200 -97.3300 251.000 122.0 112.424 3.300 -999.990 -999.990 1.124 ..P WKT 2011 02 27 11 04 55 31.3200 -97.3300 251.000 457.0 130.767 2.980 -999.990 -999.990 1.308 ..P WKT 2011 02 27 11 09 55 31.3200 -97.3300 251.000 30.0 114.480 3.770 -999.990 -999.990 1.145 ..P WKT 2011 02 27 11 14 55 31.3200 -97.3300 251.000 122.0 120.837 2.540 -999.990 -999.990 1.208 ..P WKT 2011 02 27 11 19 55 31.3200 -97.3300 251.000 457.0 131.025 2.790 -999.990 -999.990 1.310 ..P WKT 2011 02 27 11 29 55 31.3200 -97.3300 251.000 30.0 119.219 2.930 -999.990 -999.990 1.192 ..P WKT 2011 02 27 11 34 55 31.3200 -97.3300 251.000 122.0 118.540 2.970 -999.990 -999.990 1.185 ..P WKT 2011 02 27 11 39 55 31.3200 -97.3300 251.000 457.0 123.526 3.230 -999.990 -999.990 1.235 ..P WKT 2011 02 27 11 44 55 31.3200 -97.3300 251.000 30.0 112.351 3.110 -999.990 -999.990 1.124 ..P WKT 2011 02 27 11 49 55 31.3200 -97.3300 251.000 122.0 118.004 3.040 -999.990 -999.990 1.180 ..P WKT 2011 02 27 12 09 55 31.3200 -97.3300 251.000 457.0 129.281 3.310 -999.990 -999.990 1.293 ..P WKT 2011 02 27 12 10 25 31.3200 -97.3300 251.000 457.0 127.554 3.980 -999.990 -999.990 1.276 ..P WKT 2011 02 27 12 10 55 31.3200 -97.3300 251.000 457.0 121.826 4.290 -999.990 -999.990 1.218 ..P WKT 2011 02 27 12 11 25 31.3200 -97.3300 251.000 457.0 129.099 3.320 -999.990 -999.990 1.291 ..P WKT 2011 02 27 12 11 55 31.3200 -97.3300 251.000 457.0 125.372 3.630 -999.990 -999.990 1.254 ..P WKT 2011 02 27 12 12 25 31.3200 -97.3300 251.000 457.0 121.978 3.310 -999.990 -999.990 1.220 ..P WKT 2011 02 27 12 12 55 31.3200 -97.3300 251.000 457.0 130.251 4.170 -999.990 -999.990 1.303 ..P WKT 2011 02 27 12 13 25 31.3200 -97.3300 251.000 457.0 133.190 3.670 -999.990 -999.990 1.332 ..P WKT 2011 02 27 12 13 55 31.3200 -97.3300 251.000 457.0 126.129 3.370 -999.990 -999.990 1.261 ..P WKT 2011 02 27 12 14 25 31.3200 -97.3300 251.000 457.0 127.736 3.630 -999.990 -999.990 1.277 ..P WKT 2011 02 27 12 14 55 31.3200 -97.3300 251.000 457.0 125.008 4.630 -999.990 -999.990 1.250 ..P WKT 2011 02 27 12 19 55 31.3200 -97.3300 251.000 30.0 113.733 4.700 -999.990 -999.990 1.137 ..P WKT 2011 02 27 12 24 55 31.3200 -97.3300 251.000 122.0 114.460 3.680 -999.990 -999.990 1.145 ..P WKT 2011 02 27 12 29 55 31.3200 -97.3300 251.000 457.0 134.859 4.050 -999.990 -999.990 1.349 ..P WKT 2011 02 27 12 34 55 31.3200 -97.3300 251.000 30.0 113.246 3.680 -999.990 -999.990 1.132 ..P WKT 2011 02 27 12 39 55 31.3200 -97.3300 251.000 122.0 113.639 4.230 -999.990 -999.990 1.136 ..P WKT 2011 02 27 12 44 55 31.3200 -97.3300 251.000 457.0 128.039 4.620 -999.990 -999.990 1.280 ..P WKT 2011 02 27 12 54 55 31.3200 -97.3300 251.000 30.0 113.554 4.430 -999.990 -999.990 1.136 ..P WKT 2011 02 27 12 59 55 31.3200 -97.3300 251.000 122.0 119.353 3.720 -999.990 -999.990 1.194 ..P WKT 2011 02 27 13 04 55 31.3200 -97.3300 251.000 457.0 129.822 3.820 -999.990 -999.990 1.298 ..P WKT 2011 02 27 13 09 55 31.3200 -97.3300 251.000 30.0 109.269 2.920 -999.990 -999.990 1.093 ..P WKT 2011 02 27 13 14 55 31.3200 -97.3300 251.000 122.0 110.398 6.300 -999.990 -999.990 1.104 ..P WKT 2011 02 27 13 19 55 31.3200 -97.3300 251.000 457.0 125.206 2.380 -999.990 -999.990 1.252 ..P WKT 2011 02 27 13 29 55 31.3200 -97.3300 251.000 30.0 110.808 2.720 -999.990 -999.990 1.108 ..P WKT 2011 02 27 13 34 55 31.3200 -97.3300 251.000 122.0 120.970 2.890 -999.990 -999.990 1.210 ..P WKT 2011 02 27 13 39 55 31.3200 -97.3300 251.000 457.0 130.801 3.950 -999.990 -999.990 1.308 ..P WKT 2011 02 27 13 44 55 31.3200 -97.3300 251.000 30.0 111.933 4.700 -999.990 -999.990 1.119 ..P WKT 2011 02 27 13 49 55 31.3200 -97.3300 251.000 122.0 122.097 4.500 -999.990 -999.990 1.221 ..P WKT 2011 02 27 13 54 55 31.3200 -97.3300 251.000 457.0 128.591 4.440 -999.990 -999.990 1.286 ..P WKT 2011 02 27 14 04 55 31.3200 -97.3300 251.000 30.0 120.387 5.260 -999.990 -999.990 1.204 ..P WKT 2011 02 27 14 09 55 31.3200 -97.3300 251.000 122.0 117.869 5.130 -999.990 -999.990 1.179 ..P WKT 2011 02 27 14 14 55 31.3200 -97.3300 251.000 457.0 124.031 4.640 -999.990 -999.990 1.240 ..P WKT 2011 02 27 14 19 55 31.3200 -97.3300 251.000 30.0 119.009 5.280 -999.990 -999.990 1.190 ..P WKT 2011 02 27 14 24 55 31.3200 -97.3300 251.000 122.0 120.164 4.690 -999.990 -999.990 1.202 ..P WKT 2011 02 27 14 29 55 31.3200 -97.3300 251.000 457.0 125.826 4.580 -999.990 -999.990 1.258 ..P WKT 2011 02 27 14 39 55 31.3200 -97.3300 251.000 30.0 119.454 3.950 -999.990 -999.990 1.195 ..P WKT 2011 02 27 14 44 55 31.3200 -97.3300 251.000 122.0 124.450 4.550 -999.990 -999.990 1.245 ..P WKT 2011 02 27 14 49 55 31.3200 -97.3300 251.000 457.0 131.448 4.240 -999.990 -999.990 1.314 ..P WKT 2011 02 27 14 54 55 31.3200 -97.3300 251.000 30.0 118.076 3.450 -999.990 -999.990 1.181 ..P WKT 2011 02 27 14 59 55 31.3200 -97.3300 251.000 122.0 118.897 4.490 -999.990 -999.990 1.189 ..P WKT 2011 02 27 15 04 55 31.3200 -97.3300 251.000 457.0 130.907 4.020 -999.990 -999.990 1.309 ..P WKT 2011 02 27 15 14 55 31.3200 -97.3300 251.000 30.0 124.295 2.750 -999.990 -999.990 1.243 ..P WKT 2011 02 27 15 19 55 31.3200 -97.3300 251.000 122.0 128.720 4.300 -999.990 -999.990 1.287 ..P WKT 2011 02 27 15 24 55 31.3200 -97.3300 251.000 457.0 135.651 3.780 -999.990 -999.990 1.357 ..P WKT 2011 02 27 15 29 55 31.3200 -97.3300 251.000 30.0 127.380 4.810 -999.990 -999.990 1.274 ..P WKT 2011 02 27 15 34 55 31.3200 -97.3300 251.000 122.0 127.796 3.330 -999.990 -999.990 1.278 ..P WKT 2011 02 27 15 39 55 31.3200 -97.3300 251.000 457.0 134.728 4.670 -999.990 -999.990 1.347 ..P WKT 2011 02 27 15 49 55 31.3200 -97.3300 251.000 30.0 124.510 3.240 -999.990 -999.990 1.245 ..P WKT 2011 02 27 15 54 55 31.3200 -97.3300 251.000 122.0 129.580 2.980 -999.990 -999.990 1.296 ..P WKT 2011 02 27 15 59 55 31.3200 -97.3300 251.000 457.0 134.318 3.090 -999.990 -999.990 1.343 ..P WKT 2011 02 27 16 04 55 31.3200 -97.3300 251.000 30.0 131.034 3.160 -999.990 -999.990 1.310 ..P WKT 2011 02 27 16 09 55 31.3200 -97.3300 251.000 122.0 140.452 3.910 -999.990 -999.990 1.405 ..P WKT 2011 02 27 16 14 55 31.3200 -97.3300 251.000 457.0 141.848 4.020 -999.990 -999.990 1.418 ..P WKT 2011 02 27 16 24 55 31.3200 -97.3300 251.000 30.0 135.303 3.840 -999.990 -999.990 1.353 ..P WKT 2011 02 27 16 29 55 31.3200 -97.3300 251.000 122.0 136.389 3.760 -999.990 -999.990 1.364 ..P WKT 2011 02 27 16 34 55 31.3200 -97.3300 251.000 457.0 132.458 4.740 -999.990 -999.990 1.325 ..P WKT 2011 02 27 16 39 55 31.3200 -97.3300 251.000 30.0 137.223 4.030 -999.990 -999.990 1.372 ..P WKT 2011 02 27 16 44 55 31.3200 -97.3300 251.000 122.0 133.627 4.000 -999.990 -999.990 1.336 ..P WKT 2011 02 27 16 49 55 31.3200 -97.3300 251.000 457.0 134.378 3.940 -999.990 -999.990 1.344 ..P WKT 2011 02 27 17 04 55 31.3200 -97.3300 251.000 30.0 137.444 3.640 -999.990 -999.990 1.374 ..P WKT 2011 02 27 17 09 55 31.3200 -97.3300 251.000 122.0 138.100 3.710 -999.990 -999.990 1.381 ..P WKT 2011 02 27 17 14 55 31.3200 -97.3300 251.000 457.0 130.393 3.850 -999.990 -999.990 1.304 ..P WKT 2011 02 27 17 19 55 31.3200 -97.3300 251.000 30.0 139.078 3.680 -999.990 -999.990 1.391 ..P WKT 2011 02 27 17 24 55 31.3200 -97.3300 251.000 122.0 137.726 4.310 -999.990 -999.990 1.377 ..P WKT 2011 02 27 17 29 55 31.3200 -97.3300 251.000 457.0 141.059 4.560 -999.990 -999.990 1.411 ..P WKT 2011 02 27 17 39 55 31.3200 -97.3300 251.000 30.0 139.958 4.930 -999.990 -999.990 1.400 ..P WKT 2011 02 27 17 44 55 31.3200 -97.3300 251.000 122.0 137.196 4.360 -999.990 -999.990 1.372 ..P WKT 2011 02 27 17 49 55 31.3200 -97.3300 251.000 457.0 141.127 4.330 -999.990 -999.990 1.411 ..P WKT 2011 02 27 17 54 55 31.3200 -97.3300 251.000 30.0 140.876 4.280 -999.990 -999.990 1.409 ..P WKT 2011 02 27 17 59 55 31.3200 -97.3300 251.000 122.0 142.297 3.630 -999.990 -999.990 1.423 ..P WKT 2011 02 27 18 04 55 31.3200 -97.3300 251.000 457.0 145.392 4.050 -999.990 -999.990 1.454 ..P WKT 2011 02 27 18 14 55 31.3200 -97.3300 251.000 30.0 139.534 3.610 -999.990 -999.990 1.395 ..P WKT 2011 02 27 18 19 55 31.3200 -97.3300 251.000 122.0 133.926 3.960 -999.990 -999.990 1.339 ..P WKT 2011 02 27 18 24 55 31.3200 -97.3300 251.000 457.0 142.544 4.610 -999.990 -999.990 1.425 ..P WKT 2011 02 27 18 29 55 31.3200 -97.3300 251.000 30.0 135.597 4.560 -999.990 -999.990 1.356 ..P WKT 2011 02 27 18 34 55 31.3200 -97.3300 251.000 122.0 139.697 4.260 -999.990 -999.990 1.397 ..P WKT 2011 02 27 18 39 55 31.3200 -97.3300 251.000 457.0 143.631 3.950 -999.990 -999.990 1.436 ..P WKT 2011 02 27 18 49 55 31.3200 -97.3300 251.000 30.0 140.376 3.930 -999.990 -999.990 1.404 ..P WKT 2011 02 27 18 54 55 31.3200 -97.3300 251.000 122.0 140.220 4.300 -999.990 -999.990 1.402 ..P WKT 2011 02 27 18 59 55 31.3200 -97.3300 251.000 457.0 135.543 4.140 -999.990 -999.990 1.355 ..P WKT 2011 02 27 19 04 55 31.3200 -97.3300 251.000 30.0 138.066 6.100 -999.990 -999.990 1.381 ..P WKT 2011 02 27 19 09 55 31.3200 -97.3300 251.000 122.0 140.923 5.180 -999.990 -999.990 1.409 ..P WKT 2011 02 27 19 14 55 31.3200 -97.3300 251.000 457.0 143.279 4.520 -999.990 -999.990 1.433 ..P WKT 2011 02 27 19 24 55 31.3200 -97.3300 251.000 30.0 137.942 4.780 -999.990 -999.990 1.379 ..P WKT 2011 02 27 19 29 55 31.3200 -97.3300 251.000 122.0 140.131 4.430 -999.990 -999.990 1.401 ..P WKT 2011 02 27 19 34 55 31.3200 -97.3300 251.000 457.0 145.167 4.270 -999.990 -999.990 1.452 ..P WKT 2011 02 27 19 39 55 31.3200 -97.3300 251.000 30.0 142.666 4.800 -999.990 -999.990 1.427 ..P WKT 2011 02 27 19 44 55 31.3200 -97.3300 251.000 122.0 139.326 4.190 -999.990 -999.990 1.393 ..P WKT 2011 02 27 19 49 55 31.3200 -97.3300 251.000 457.0 145.201 5.200 -999.990 -999.990 1.452 ..P WKT 2011 02 27 19 59 55 31.3200 -97.3300 251.000 30.0 141.155 4.310 -999.990 -999.990 1.412 ..P WKT 2011 02 27 20 04 55 31.3200 -97.3300 251.000 122.0 147.318 4.350 -999.990 -999.990 1.473 ..P WKT 2011 02 27 20 09 55 31.3200 -97.3300 251.000 457.0 145.773 4.760 -999.990 -999.990 1.458 ..P WKT 2011 02 27 20 14 55 31.3200 -97.3300 251.000 30.0 144.564 4.760 -999.990 -999.990 1.446 ..P WKT 2011 02 27 20 19 55 31.3200 -97.3300 251.000 122.0 147.711 4.870 -999.990 -999.990 1.477 ..P WKT 2011 02 27 20 24 55 31.3200 -97.3300 251.000 457.0 147.843 4.770 -999.990 -999.990 1.478 ..P WKT 2011 02 27 20 34 55 31.3200 -97.3300 251.000 30.0 146.572 5.380 -999.990 -999.990 1.466 ..P WKT 2011 02 27 20 39 55 31.3200 -97.3300 251.000 122.0 147.183 4.700 -999.990 -999.990 1.472 ..P WKT 2011 02 27 20 44 55 31.3200 -97.3300 251.000 457.0 143.770 6.160 -999.990 -999.990 1.438 ..P WKT 2011 02 27 20 49 55 31.3200 -97.3300 251.000 30.0 145.385 4.270 -999.990 -999.990 1.454 ..P WKT 2011 02 27 20 54 55 31.3200 -97.3300 251.000 122.0 148.008 6.450 -999.990 -999.990 1.480 ..P WKT 2011 02 27 20 59 55 31.3200 -97.3300 251.000 457.0 144.929 6.440 -999.990 -999.990 1.449 ..P WKT 2011 02 27 21 09 55 31.3200 -97.3300 251.000 30.0 142.797 4.340 -999.990 -999.990 1.428 ..P WKT 2011 02 27 21 14 55 31.3200 -97.3300 251.000 122.0 150.449 4.510 -999.990 -999.990 1.504 ..P WKT 2011 02 27 21 19 55 31.3200 -97.3300 251.000 457.0 153.408 6.150 -999.990 -999.990 1.534 ..P WKT 2011 02 27 21 24 55 31.3200 -97.3300 251.000 30.0 147.646 7.500 -999.990 -999.990 1.476 ..P WKT 2011 02 27 21 29 55 31.3200 -97.3300 251.000 122.0 155.971 6.640 -999.990 -999.990 1.560 ..P WKT 2011 02 27 21 34 55 31.3200 -97.3300 251.000 457.0 157.253 5.240 -999.990 -999.990 1.573 ..P WKT 2011 02 27 21 44 55 31.3200 -97.3300 251.000 30.0 150.160 5.500 -999.990 -999.990 1.502 ..P WKT 2011 02 27 21 49 55 31.3200 -97.3300 251.000 122.0 153.862 6.850 -999.990 -999.990 1.539 ..P WKT 2011 02 27 21 54 55 31.3200 -97.3300 251.000 457.0 153.370 8.180 -999.990 -999.990 1.534 ..P WKT 2011 02 27 21 59 55 31.3200 -97.3300 251.000 30.0 148.852 7.850 -999.990 -999.990 1.489 ..P WKT 2011 02 27 22 04 55 31.3200 -97.3300 251.000 122.0 149.535 7.030 -999.990 -999.990 1.495 ..P WKT 2011 02 27 22 09 55 31.3200 -97.3300 251.000 457.0 147.197 5.350 -999.990 -999.990 1.472 ..P WKT 2011 02 27 22 19 55 31.3200 -97.3300 251.000 30.0 142.690 6.260 -999.990 -999.990 1.427 ..P WKT 2011 02 27 22 24 55 31.3200 -97.3300 251.000 122.0 145.387 6.990 -999.990 -999.990 1.454 ..P WKT 2011 02 27 22 29 55 31.3200 -97.3300 251.000 457.0 137.678 8.390 -999.990 -999.990 1.377 ..P WKT 2011 02 27 22 34 55 31.3200 -97.3300 251.000 30.0 148.095 6.410 -999.990 -999.990 1.481 ..P WKT 2011 02 27 22 39 55 31.3200 -97.3300 251.000 122.0 152.134 5.890 -999.990 -999.990 1.521 ..P WKT 2011 02 27 22 44 55 31.3200 -97.3300 251.000 457.0 144.257 5.260 -999.990 -999.990 1.443 ..P WKT 2011 02 27 22 54 55 31.3200 -97.3300 251.000 30.0 145.191 5.980 -999.990 -999.990 1.452 ..P WKT 2011 02 27 22 59 55 31.3200 -97.3300 251.000 122.0 150.646 6.190 -999.990 -999.990 1.506 ..P WKT 2011 02 27 23 04 55 31.3200 -97.3300 251.000 457.0 144.854 6.710 -999.990 -999.990 1.449 ..P WKT 2011 02 27 23 09 55 31.3200 -97.3300 251.000 30.0 138.390 5.750 -999.990 -999.990 1.384 ..P WKT 2011 02 27 23 14 55 31.3200 -97.3300 251.000 122.0 144.181 6.400 -999.990 -999.990 1.442 ..P WKT 2011 02 27 23 19 55 31.3200 -97.3300 251.000 457.0 140.402 5.820 -999.990 -999.990 1.404 ..P WKT 2011 02 27 23 29 55 31.3200 -97.3300 251.000 30.0 132.623 5.070 -999.990 -999.990 1.326 ..P WKT 2011 02 27 23 34 55 31.3200 -97.3300 251.000 122.0 135.170 5.820 -999.990 -999.990 1.352 ..P WKT 2011 02 27 23 39 55 31.3200 -97.3300 251.000 457.0 135.367 5.360 -999.990 -999.990 1.354 ..P WKT 2011 02 27 23 44 55 31.3200 -97.3300 251.000 30.0 129.517 5.380 -999.990 -999.990 1.295 ..P WKT 2011 02 27 23 49 55 31.3200 -97.3300 251.000 122.0 137.776 5.400 -999.990 -999.990 1.378 ..P WKT 2011 02 28 00 09 55 31.3200 -97.3300 251.000 457.0 146.919 6.280 -999.990 -999.990 1.469 ..P WKT 2011 02 28 00 10 25 31.3200 -97.3300 251.000 457.0 141.620 6.440 -999.990 -999.990 1.416 ..P WKT 2011 02 28 00 10 55 31.3200 -97.3300 251.000 457.0 140.352 6.220 -999.990 -999.990 1.404 ..P WKT 2011 02 28 00 11 25 31.3200 -97.3300 251.000 457.0 147.148 5.930 -999.990 -999.990 1.471 ..P WKT 2011 02 28 00 11 55 31.3200 -97.3300 251.000 457.0 143.529 5.640 -999.990 -999.990 1.435 ..P WKT 2011 02 28 00 12 25 31.3200 -97.3300 251.000 457.0 145.957 5.640 -999.990 -999.990 1.460 ..P WKT 2011 02 28 00 12 55 31.3200 -97.3300 251.000 457.0 144.018 5.570 -999.990 -999.990 1.440 ..P WKT 2011 02 28 00 13 25 31.3200 -97.3300 251.000 457.0 147.454 5.670 -999.990 -999.990 1.475 ..P WKT 2011 02 28 00 13 55 31.3200 -97.3300 251.000 457.0 144.171 5.610 -999.990 -999.990 1.442 ..P WKT 2011 02 28 00 14 25 31.3200 -97.3300 251.000 457.0 148.950 5.560 -999.990 -999.990 1.489 ..P WKT 2011 02 28 00 14 55 31.3200 -97.3300 251.000 457.0 142.979 6.600 -999.990 -999.990 1.430 ..P WKT 2011 02 28 00 19 55 31.3200 -97.3300 251.000 30.0 140.049 5.770 -999.990 -999.990 1.400 ..P WKT 2011 02 28 00 24 55 31.3200 -97.3300 251.000 122.0 146.189 5.760 -999.990 -999.990 1.462 ..P WKT 2011 02 28 00 29 55 31.3200 -97.3300 251.000 457.0 146.618 6.300 -999.990 -999.990 1.466 ..P WKT 2011 02 28 00 34 55 31.3200 -97.3300 251.000 30.0 142.006 5.490 -999.990 -999.990 1.420 ..P WKT 2011 02 28 00 39 55 31.3200 -97.3300 251.000 122.0 142.771 5.770 -999.990 -999.990 1.428 ..P WKT 2011 02 28 00 44 55 31.3200 -97.3300 251.000 457.0 136.144 6.510 -999.990 -999.990 1.361 ..P WKT 2011 02 28 00 54 55 31.3200 -97.3300 251.000 30.0 138.174 5.030 -999.990 -999.990 1.382 ..P WKT 2011 02 28 00 59 55 31.3200 -97.3300 251.000 122.0 141.793 5.800 -999.990 -999.990 1.418 ..P WKT 2011 02 28 01 04 55 31.3200 -97.3300 251.000 457.0 135.330 5.850 -999.990 -999.990 1.353 ..P WKT 2011 02 28 01 09 55 31.3200 -97.3300 251.000 30.0 137.268 5.410 -999.990 -999.990 1.373 ..P WKT 2011 02 28 01 14 55 31.3200 -97.3300 251.000 122.0 145.591 5.740 -999.990 -999.990 1.456 ..P WKT 2011 02 28 01 19 55 31.3200 -97.3300 251.000 457.0 132.743 5.340 -999.990 -999.990 1.327 ..P WKT 2011 02 28 01 29 55 31.3200 -97.3300 251.000 30.0 129.322 4.850 -999.990 -999.990 1.293 ..P WKT 2011 02 28 01 34 55 31.3200 -97.3300 251.000 122.0 128.668 5.160 -999.990 -999.990 1.287 ..P WKT 2011 02 28 01 39 55 31.3200 -97.3300 251.000 457.0 136.919 5.280 -999.990 -999.990 1.369 ..P WKT 2011 02 28 01 44 55 31.3200 -97.3300 251.000 30.0 129.375 4.900 -999.990 -999.990 1.294 ..P WKT 2011 02 28 01 49 55 31.3200 -97.3300 251.000 122.0 126.705 4.840 -999.990 -999.990 1.267 ..P WKT 2011 02 28 01 54 55 31.3200 -97.3300 251.000 457.0 131.259 4.840 -999.990 -999.990 1.313 ..P WKT 2011 02 28 02 04 55 31.3200 -97.3300 251.000 30.0 138.762 4.870 -999.990 -999.990 1.388 ..P WKT 2011 02 28 02 09 55 31.3200 -97.3300 251.000 122.0 136.163 5.440 -999.990 -999.990 1.362 ..P WKT 2011 02 28 02 14 55 31.3200 -97.3300 251.000 457.0 137.260 5.090 -999.990 -999.990 1.373 ..P WKT 2011 02 28 02 19 55 31.3200 -97.3300 251.000 30.0 130.461 5.100 -999.990 -999.990 1.305 ..P WKT 2011 02 28 02 24 55 31.3200 -97.3300 251.000 122.0 132.566 4.530 -999.990 -999.990 1.326 ..P WKT 2011 02 28 02 29 55 31.3200 -97.3300 251.000 457.0 131.480 5.380 -999.990 -999.990 1.315 ..P WKT 2011 02 28 02 39 55 31.3200 -97.3300 251.000 30.0 121.071 5.170 -999.990 -999.990 1.211 ..P WKT 2011 02 28 02 44 55 31.3200 -97.3300 251.000 122.0 132.590 4.500 -999.990 -999.990 1.326 ..P WKT 2011 02 28 02 49 55 31.3200 -97.3300 251.000 457.0 138.563 5.140 -999.990 -999.990 1.386 ..P WKT 2011 02 28 02 54 55 31.3200 -97.3300 251.000 30.0 125.038 5.360 -999.990 -999.990 1.250 ..P WKT 2011 02 28 02 59 55 31.3200 -97.3300 251.000 122.0 129.834 5.350 -999.990 -999.990 1.298 ..P WKT 2011 02 28 03 04 55 31.3200 -97.3300 251.000 457.0 141.858 5.340 -999.990 -999.990 1.419 ..P WKT 2011 02 28 03 14 55 31.3200 -97.3300 251.000 30.0 124.052 5.110 -999.990 -999.990 1.241 ..P WKT 2011 02 28 03 19 55 31.3200 -97.3300 251.000 122.0 129.185 5.020 -999.990 -999.990 1.292 ..P WKT 2011 02 28 03 24 55 31.3200 -97.3300 251.000 457.0 133.981 4.970 -999.990 -999.990 1.340 ..P WKT 2011 02 28 03 29 55 31.3200 -97.3300 251.000 30.0 123.817 5.300 -999.990 -999.990 1.238 ..P WKT 2011 02 28 03 34 55 31.3200 -97.3300 251.000 122.0 129.454 4.900 -999.990 -999.990 1.295 ..P WKT 2011 02 28 03 39 55 31.3200 -97.3300 251.000 457.0 136.773 4.420 -999.990 -999.990 1.368 ..P WKT 2011 02 28 03 49 55 31.3200 -97.3300 251.000 30.0 125.016 4.170 -999.990 -999.990 1.250 ..P WKT 2011 02 28 03 54 55 31.3200 -97.3300 251.000 122.0 133.680 5.500 -999.990 -999.990 1.337 ..P WKT 2011 02 28 03 59 55 31.3200 -97.3300 251.000 457.0 141.000 5.990 -999.990 -999.990 1.410 ..P WKT 2011 02 28 04 04 55 31.3200 -97.3300 251.000 30.0 135.205 6.210 -999.990 -999.990 1.352 ..P WKT 2011 02 28 04 09 55 31.3200 -97.3300 251.000 122.0 142.861 5.920 -999.990 -999.990 1.429 ..P WKT 2011 02 28 04 14 55 31.3200 -97.3300 251.000 457.0 146.146 4.920 -999.990 -999.990 1.461 ..P WKT 2011 02 28 04 24 55 31.3200 -97.3300 251.000 30.0 137.295 5.100 -999.990 -999.990 1.373 ..P WKT 2011 02 28 04 29 55 31.3200 -97.3300 251.000 122.0 146.345 5.600 -999.990 -999.990 1.463 ..P WKT 2011 02 28 04 34 55 31.3200 -97.3300 251.000 457.0 139.924 6.110 -999.990 -999.990 1.399 ..P WKT 2011 02 28 04 39 55 31.3200 -97.3300 251.000 30.0 138.549 5.280 -999.990 -999.990 1.385 ..P WKT 2011 02 28 04 44 55 31.3200 -97.3300 251.000 122.0 145.918 4.180 -999.990 -999.990 1.459 ..P WKT 2011 02 28 04 49 55 31.3200 -97.3300 251.000 457.0 136.471 4.180 -999.990 -999.990 1.365 ..P WKT 2011 02 28 05 04 55 31.3200 -97.3300 251.000 30.0 133.912 4.280 -999.990 -999.990 1.339 ..P WKT 2011 02 28 05 09 55 31.3200 -97.3300 251.000 122.0 137.020 4.310 -999.990 -999.990 1.370 ..P WKT 2011 02 28 05 14 55 31.3200 -97.3300 251.000 457.0 145.174 4.590 -999.990 -999.990 1.452 ..P WKT 2011 02 28 05 19 55 31.3200 -97.3300 251.000 30.0 135.164 4.670 -999.990 -999.990 1.352 ..P WKT 2011 02 28 05 24 55 31.3200 -97.3300 251.000 122.0 139.954 4.920 -999.990 -999.990 1.400 ..P WKT 2011 02 28 05 29 55 31.3200 -97.3300 251.000 457.0 132.467 6.080 -999.990 -999.990 1.325 ..P WKT 2011 02 28 05 39 55 31.3200 -97.3300 251.000 30.0 136.531 5.300 -999.990 -999.990 1.365 ..P WKT 2011 02 28 05 44 55 31.3200 -97.3300 251.000 122.0 141.186 4.890 -999.990 -999.990 1.412 ..P WKT 2011 02 28 05 49 55 31.3200 -97.3300 251.000 457.0 134.068 4.390 -999.990 -999.990 1.341 ..P WKT 2011 02 28 05 54 55 31.3200 -97.3300 251.000 30.0 177.745 5.190 -999.990 -999.990 1.777 ..P WKT 2011 02 28 05 59 55 31.3200 -97.3300 251.000 122.0 168.777 5.260 -999.990 -999.990 1.688 ..P WKT 2011 02 28 06 04 55 31.3200 -97.3300 251.000 457.0 152.912 4.090 -999.990 -999.990 1.529 ..P WKT 2011 02 28 06 14 55 31.3200 -97.3300 251.000 30.0 181.664 4.500 -999.990 -999.990 1.817 ..P WKT 2011 02 28 06 19 55 31.3200 -97.3300 251.000 122.0 269.850 4.900 -999.990 -999.990 2.699 ..P WKT 2011 02 28 06 24 55 31.3200 -97.3300 251.000 457.0 177.544 5.170 -999.990 -999.990 1.775 ..P WKT 2011 02 28 06 29 55 31.3200 -97.3300 251.000 30.0 223.006 4.750 -999.990 -999.990 2.230 ..P WKT 2011 02 28 06 34 55 31.3200 -97.3300 251.000 122.0 233.983 4.360 -999.990 -999.990 2.340 ..P WKT 2011 02 28 06 39 55 31.3200 -97.3300 251.000 457.0 162.869 4.390 -999.990 -999.990 1.629 ..P WKT 2011 02 28 06 49 55 31.3200 -97.3300 251.000 30.0 224.045 4.300 -999.990 -999.990 2.240 ..P WKT 2011 02 28 06 54 55 31.3200 -97.3300 251.000 122.0 191.307 4.770 -999.990 -999.990 1.913 ..P WKT 2011 02 28 06 59 55 31.3200 -97.3300 251.000 457.0 186.495 4.080 -999.990 -999.990 1.865 ..P WKT 2011 02 28 07 04 55 31.3200 -97.3300 251.000 30.0 210.789 3.860 -999.990 -999.990 2.108 ..P WKT 2011 02 28 07 09 55 31.3200 -97.3300 251.000 122.0 187.470 4.630 -999.990 -999.990 1.875 ..P WKT 2011 02 28 07 14 55 31.3200 -97.3300 251.000 457.0 243.227 4.680 -999.990 -999.990 2.432 ..P WKT 2011 02 28 07 24 55 31.3200 -97.3300 251.000 30.0 195.459 4.500 -999.990 -999.990 1.955 ..P WKT 2011 02 28 07 29 55 31.3200 -97.3300 251.000 122.0 217.783 4.740 -999.990 -999.990 2.178 ..P WKT 2011 02 28 07 34 55 31.3200 -97.3300 251.000 457.0 177.348 5.830 -999.990 -999.990 1.773 ..P WKT 2011 02 28 07 39 55 31.3200 -97.3300 251.000 30.0 204.049 3.860 -999.990 -999.990 2.040 ..P WKT 2011 02 28 07 44 55 31.3200 -97.3300 251.000 122.0 207.866 4.990 -999.990 -999.990 2.079 ..P WKT 2011 02 28 07 49 55 31.3200 -97.3300 251.000 457.0 148.752 3.400 -999.990 -999.990 1.488 ..P WKT 2011 02 28 07 59 55 31.3200 -97.3300 251.000 30.0 199.943 4.170 -999.990 -999.990 1.999 ..P WKT 2011 02 28 08 04 55 31.3200 -97.3300 251.000 122.0 176.980 3.690 -999.990 -999.990 1.770 ..P WKT 2011 02 28 08 09 55 31.3200 -97.3300 251.000 457.0 153.007 3.800 -999.990 -999.990 1.530 ..P WKT 2011 02 28 08 14 55 31.3200 -97.3300 251.000 30.0 189.951 4.810 -999.990 -999.990 1.900 ..P WKT 2011 02 28 08 19 55 31.3200 -97.3300 251.000 122.0 168.670 4.300 -999.990 -999.990 1.687 ..P WKT 2011 02 28 08 24 55 31.3200 -97.3300 251.000 457.0 139.983 5.020 -999.990 -999.990 1.400 ..P WKT 2011 02 28 08 34 55 31.3200 -97.3300 251.000 30.0 183.535 4.360 -999.990 -999.990 1.835 ..P WKT 2011 02 28 08 39 55 31.3200 -97.3300 251.000 122.0 165.570 4.460 -999.990 -999.990 1.656 ..P WKT 2011 02 28 08 44 55 31.3200 -97.3300 251.000 457.0 132.458 4.490 -999.990 -999.990 1.325 ..P WKT 2011 02 28 08 49 55 31.3200 -97.3300 251.000 30.0 165.318 4.440 -999.990 -999.990 1.653 ..P WKT 2011 02 28 08 54 55 31.3200 -97.3300 251.000 122.0 151.392 4.060 -999.990 -999.990 1.514 ..P WKT 2011 02 28 08 59 55 31.3200 -97.3300 251.000 457.0 137.801 4.000 -999.990 -999.990 1.378 ..P WKT 2011 02 28 09 09 55 31.3200 -97.3300 251.000 30.0 159.670 4.490 -999.990 -999.990 1.597 ..P WKT 2011 02 28 09 14 55 31.3200 -97.3300 251.000 122.0 145.982 3.950 -999.990 -999.990 1.460 ..P WKT 2011 02 28 09 19 55 31.3200 -97.3300 251.000 457.0 141.047 5.800 -999.990 -999.990 1.410 ..P WKT 2011 02 28 09 24 55 31.3200 -97.3300 251.000 30.0 144.191 4.350 -999.990 -999.990 1.442 ..P WKT 2011 02 28 09 29 55 31.3200 -97.3300 251.000 122.0 141.949 4.090 -999.990 -999.990 1.419 ..P WKT 2011 02 28 09 34 55 31.3200 -97.3300 251.000 457.0 150.648 4.320 -999.990 -999.990 1.506 ..P WKT 2011 02 28 09 44 55 31.3200 -97.3300 251.000 30.0 133.802 3.550 -999.990 -999.990 1.338 ..P WKT 2011 02 28 09 49 55 31.3200 -97.3300 251.000 122.0 136.706 3.410 -999.990 -999.990 1.367 ..P WKT 2011 02 28 09 54 55 31.3200 -97.3300 251.000 457.0 142.135 3.200 -999.990 -999.990 1.421 ..P WKT 2011 02 28 09 59 55 31.3200 -97.3300 251.000 30.0 133.760 4.750 -999.990 -999.990 1.338 ..P WKT 2011 02 28 10 04 55 31.3200 -97.3300 251.000 122.0 137.506 3.070 -999.990 -999.990 1.375 ..P WKT 2011 02 28 10 09 55 31.3200 -97.3300 251.000 457.0 143.439 3.230 -999.990 -999.990 1.434 ..P WKT 2011 02 28 10 19 55 31.3200 -97.3300 251.000 30.0 142.994 3.460 -999.990 -999.990 1.430 ..P WKT 2011 02 28 10 24 55 31.3200 -97.3300 251.000 122.0 141.329 4.310 -999.990 -999.990 1.413 ..P WKT 2011 02 28 10 29 55 31.3200 -97.3300 251.000 457.0 146.229 3.620 -999.990 -999.990 1.462 ..P WKT 2011 02 28 10 34 55 31.3200 -97.3300 251.000 30.0 146.753 5.010 -999.990 -999.990 1.468 ..P WKT 2011 02 28 10 39 55 31.3200 -97.3300 251.000 122.0 144.919 2.980 -999.990 -999.990 1.449 ..P WKT 2011 02 28 10 44 55 31.3200 -97.3300 251.000 457.0 141.402 3.220 -999.990 -999.990 1.414 ..P WKT 2011 02 28 10 54 55 31.3200 -97.3300 251.000 30.0 152.407 4.170 -999.990 -999.990 1.524 ..P WKT 2011 02 28 10 59 55 31.3200 -97.3300 251.000 122.0 154.469 4.300 -999.990 -999.990 1.545 ..P WKT 2011 02 28 11 04 55 31.3200 -97.3300 251.000 457.0 149.629 3.700 -999.990 -999.990 1.496 ..P WKT 2011 02 28 11 09 55 31.3200 -97.3300 251.000 30.0 151.354 3.650 -999.990 -999.990 1.514 ..P WKT 2011 02 28 11 14 55 31.3200 -97.3300 251.000 122.0 153.585 3.940 -999.990 -999.990 1.536 ..P WKT 2011 02 28 11 19 55 31.3200 -97.3300 251.000 457.0 155.312 5.280 -999.990 -999.990 1.553 ..P WKT 2011 02 28 11 29 55 31.3200 -97.3300 251.000 30.0 153.268 4.450 -999.990 -999.990 1.533 ..P WKT 2011 02 28 11 34 55 31.3200 -97.3300 251.000 122.0 161.285 3.980 -999.990 -999.990 1.613 ..P WKT 2011 02 28 11 39 55 31.3200 -97.3300 251.000 457.0 153.135 3.740 -999.990 -999.990 1.531 ..P WKT 2011 02 28 11 44 55 31.3200 -97.3300 251.000 30.0 157.111 5.790 -999.990 -999.990 1.571 ..P WKT 2011 02 28 11 49 55 31.3200 -97.3300 251.000 122.0 154.015 3.840 -999.990 -999.990 1.540 ..P WKT 2011 02 28 12 09 55 31.3200 -97.3300 251.000 457.0 143.340 4.320 -999.990 -999.990 1.433 ..P WKT 2011 02 28 12 10 25 31.3200 -97.3300 251.000 457.0 141.316 3.430 -999.990 -999.990 1.413 ..P WKT 2011 02 28 12 10 55 31.3200 -97.3300 251.000 457.0 142.661 3.980 -999.990 -999.990 1.427 ..P WKT 2011 02 28 12 11 25 31.3200 -97.3300 251.000 457.0 141.985 3.490 -999.990 -999.990 1.420 ..P WKT 2011 02 28 12 11 55 31.3200 -97.3300 251.000 457.0 142.656 3.220 -999.990 -999.990 1.427 ..P WKT 2011 02 28 12 12 25 31.3200 -97.3300 251.000 457.0 145.011 2.850 -999.990 -999.990 1.450 ..P WKT 2011 02 28 12 12 55 31.3200 -97.3300 251.000 457.0 145.344 2.770 -999.990 -999.990 1.453 ..P WKT 2011 02 28 12 13 25 31.3200 -97.3300 251.000 457.0 144.331 4.300 -999.990 -999.990 1.443 ..P WKT 2011 02 28 12 13 55 31.3200 -97.3300 251.000 457.0 143.656 5.720 -999.990 -999.990 1.437 ..P WKT 2011 02 28 12 14 25 31.3200 -97.3300 251.000 457.0 138.938 3.460 -999.990 -999.990 1.389 ..P WKT 2011 02 28 12 14 55 31.3200 -97.3300 251.000 457.0 147.354 3.000 -999.990 -999.990 1.474 ..P WKT 2011 02 28 12 19 55 31.3200 -97.3300 251.000 30.0 155.074 3.600 -999.990 -999.990 1.551 ..P WKT 2011 02 28 12 24 55 31.3200 -97.3300 251.000 122.0 157.404 3.600 -999.990 -999.990 1.574 ..P WKT 2011 02 28 12 29 55 31.3200 -97.3300 251.000 457.0 141.887 2.830 -999.990 -999.990 1.419 ..P WKT 2011 02 28 12 34 55 31.3200 -97.3300 251.000 30.0 157.013 2.970 -999.990 -999.990 1.570 ..P WKT 2011 02 28 12 39 55 31.3200 -97.3300 251.000 122.0 160.690 3.320 -999.990 -999.990 1.607 ..P WKT 2011 02 28 12 44 55 31.3200 -97.3300 251.000 457.0 143.828 2.960 -999.990 -999.990 1.438 ..P WKT 2011 02 28 12 54 55 31.3200 -97.3300 251.000 30.0 156.918 2.580 -999.990 -999.990 1.569 ..P WKT 2011 02 28 12 59 55 31.3200 -97.3300 251.000 122.0 153.538 3.590 -999.990 -999.990 1.535 ..P WKT 2011 02 28 13 04 55 31.3200 -97.3300 251.000 457.0 154.871 2.660 -999.990 -999.990 1.549 ..P WKT 2011 02 28 13 09 55 31.3200 -97.3300 251.000 30.0 161.254 2.900 -999.990 -999.990 1.613 ..P WKT 2011 02 28 13 14 55 31.3200 -97.3300 251.000 122.0 161.576 3.470 -999.990 -999.990 1.616 ..P WKT 2011 02 28 13 19 55 31.3200 -97.3300 251.000 457.0 153.484 3.080 -999.990 -999.990 1.535 ..P WKT 2011 02 28 13 29 55 31.3200 -97.3300 251.000 30.0 160.213 4.380 -999.990 -999.990 1.602 ..P WKT 2011 02 28 13 34 55 31.3200 -97.3300 251.000 122.0 148.274 3.080 -999.990 -999.990 1.483 ..P WKT 2011 02 28 13 39 55 31.3200 -97.3300 251.000 457.0 154.007 3.160 -999.990 -999.990 1.540 ..P WKT 2011 02 28 13 44 55 31.3200 -97.3300 251.000 30.0 159.907 3.340 -999.990 -999.990 1.599 ..P WKT 2011 02 28 13 49 55 31.3200 -97.3300 251.000 122.0 153.355 2.810 -999.990 -999.990 1.534 ..P WKT 2011 02 28 13 54 55 31.3200 -97.3300 251.000 457.0 153.534 3.430 -999.990 -999.990 1.535 ..P WKT 2011 02 28 14 04 55 31.3200 -97.3300 251.000 30.0 150.070 3.850 -999.990 -999.990 1.501 ..P WKT 2011 02 28 14 09 55 31.3200 -97.3300 251.000 122.0 153.998 2.770 -999.990 -999.990 1.540 ..P WKT 2011 02 28 14 14 55 31.3200 -97.3300 251.000 457.0 153.047 2.840 -999.990 -999.990 1.530 ..P WKT 2011 02 28 14 19 55 31.3200 -97.3300 251.000 30.0 152.601 3.050 -999.990 -999.990 1.526 ..P WKT 2011 02 28 14 24 55 31.3200 -97.3300 251.000 122.0 151.314 4.650 -999.990 -999.990 1.513 ..P WKT 2011 02 28 14 29 55 31.3200 -97.3300 251.000 457.0 159.616 2.540 -999.990 -999.990 1.596 ..P WKT 2011 02 28 14 39 55 31.3200 -97.3300 251.000 30.0 180.156 3.040 -999.990 -999.990 1.802 ..P WKT 2011 02 28 14 44 55 31.3200 -97.3300 251.000 122.0 186.004 3.120 -999.990 -999.990 1.860 ..P WKT 2011 02 28 14 49 55 31.3200 -97.3300 251.000 457.0 173.351 2.830 -999.990 -999.990 1.734 ..P WKT 2011 02 28 14 54 55 31.3200 -97.3300 251.000 30.0 179.872 3.690 -999.990 -999.990 1.799 ..P WKT 2011 02 28 14 59 55 31.3200 -97.3300 251.000 122.0 185.383 4.030 -999.990 -999.990 1.854 ..P WKT 2011 02 28 15 04 55 31.3200 -97.3300 251.000 457.0 176.599 3.060 -999.990 -999.990 1.766 ..P WKT 2011 02 28 15 14 55 31.3200 -97.3300 251.000 30.0 182.937 2.960 -999.990 -999.990 1.829 ..P WKT 2011 02 28 15 19 55 31.3200 -97.3300 251.000 122.0 176.700 2.820 -999.990 -999.990 1.767 ..P WKT 2011 02 28 15 24 55 31.3200 -97.3300 251.000 457.0 183.244 3.910 -999.990 -999.990 1.832 ..P WKT 2011 02 28 15 29 55 31.3200 -97.3300 251.000 30.0 182.893 2.710 -999.990 -999.990 1.829 ..P WKT 2011 02 28 15 34 55 31.3200 -97.3300 251.000 122.0 186.240 3.220 -999.990 -999.990 1.862 ..P WKT 2011 02 28 15 39 55 31.3200 -97.3300 251.000 457.0 179.501 3.490 -999.990 -999.990 1.795 ..P WKT 2011 02 28 15 49 55 31.3200 -97.3300 251.000 30.0 171.955 3.230 -999.990 -999.990 1.720 ..P WKT 2011 02 28 15 54 55 31.3200 -97.3300 251.000 122.0 172.157 3.490 -999.990 -999.990 1.722 ..P WKT 2011 02 28 15 59 55 31.3200 -97.3300 251.000 457.0 180.091 3.200 -999.990 -999.990 1.801 ..P WKT 2011 02 28 16 04 55 31.3200 -97.3300 251.000 30.0 174.242 3.550 -999.990 -999.990 1.742 ..P WKT 2011 02 28 16 09 55 31.3200 -97.3300 251.000 122.0 170.746 3.840 -999.990 -999.990 1.707 ..P WKT 2011 02 28 16 14 55 31.3200 -97.3300 251.000 457.0 175.318 3.690 -999.990 -999.990 1.753 ..P WKT 2011 02 28 16 24 55 31.3200 -97.3300 251.000 30.0 175.673 4.630 -999.990 -999.990 1.757 ..P WKT 2011 02 28 16 29 55 31.3200 -97.3300 251.000 122.0 184.902 3.830 -999.990 -999.990 1.849 ..P WKT 2011 02 28 16 34 55 31.3200 -97.3300 251.000 457.0 179.341 3.790 -999.990 -999.990 1.793 ..P WKT 2011 02 28 16 39 55 31.3200 -97.3300 251.000 30.0 182.855 4.660 -999.990 -999.990 1.829 ..P WKT 2011 02 28 16 44 55 31.3200 -97.3300 251.000 122.0 178.976 4.400 -999.990 -999.990 1.790 ..P WKT 2011 02 28 16 49 55 31.3200 -97.3300 251.000 457.0 184.842 3.290 -999.990 -999.990 1.848 ..P WKT 2011 02 28 17 04 55 31.3200 -97.3300 251.000 30.0 180.268 4.710 -999.990 -999.990 1.803 ..P WKT 2011 02 28 17 09 55 31.3200 -97.3300 251.000 122.0 188.992 4.640 -999.990 -999.990 1.890 ..P WKT 2011 02 28 17 14 55 31.3200 -97.3300 251.000 457.0 175.541 4.890 -999.990 -999.990 1.755 ..P WKT 2011 02 28 17 19 55 31.3200 -97.3300 251.000 30.0 180.905 3.920 -999.990 -999.990 1.809 ..P WKT 2011 02 28 17 24 55 31.3200 -97.3300 251.000 122.0 180.054 3.440 -999.990 -999.990 1.801 ..P WKT 2011 02 28 17 29 55 31.3200 -97.3300 251.000 457.0 171.980 3.250 -999.990 -999.990 1.720 ..P WKT 2011 02 28 17 39 55 31.3200 -97.3300 251.000 30.0 164.589 3.090 -999.990 -999.990 1.646 ..P WKT 2011 02 28 17 44 55 31.3200 -97.3300 251.000 122.0 163.422 3.830 -999.990 -999.990 1.634 ..P WKT 2011 02 28 17 49 55 31.3200 -97.3300 251.000 457.0 170.822 3.820 -999.990 -999.990 1.708 ..P WKT 2011 02 28 17 54 55 31.3200 -97.3300 251.000 30.0 177.885 3.580 -999.990 -999.990 1.779 ..P WKT 2011 02 28 17 59 55 31.3200 -97.3300 251.000 122.0 172.017 4.030 -999.990 -999.990 1.720 ..P WKT 2011 02 28 18 04 55 31.3200 -97.3300 251.000 457.0 178.576 3.070 -999.990 -999.990 1.786 ..P WKT 2011 02 28 18 14 55 31.3200 -97.3300 251.000 30.0 178.235 4.080 -999.990 -999.990 1.782 ..P WKT 2011 02 28 18 19 55 31.3200 -97.3300 251.000 122.0 173.855 3.710 -999.990 -999.990 1.739 ..P WKT 2011 02 28 18 24 55 31.3200 -97.3300 251.000 457.0 175.352 3.210 -999.990 -999.990 1.754 ..P WKT 2011 02 28 18 29 55 31.3200 -97.3300 251.000 30.0 178.023 4.190 -999.990 -999.990 1.780 ..P WKT 2011 02 28 18 34 55 31.3200 -97.3300 251.000 122.0 175.491 4.760 -999.990 -999.990 1.755 ..P WKT 2011 02 28 18 39 55 31.3200 -97.3300 251.000 457.0 173.966 3.950 -999.990 -999.990 1.740 ..P WKT 2011 02 28 18 49 55 31.3200 -97.3300 251.000 30.0 169.141 3.430 -999.990 -999.990 1.691 ..P WKT 2011 02 28 18 54 55 31.3200 -97.3300 251.000 122.0 165.842 3.600 -999.990 -999.990 1.658 ..P WKT 2011 02 28 18 59 55 31.3200 -97.3300 251.000 457.0 171.606 3.440 -999.990 -999.990 1.716 ..P WKT 2011 02 28 19 04 55 31.3200 -97.3300 251.000 30.0 167.133 3.300 -999.990 -999.990 1.671 ..P WKT 2011 02 28 19 09 55 31.3200 -97.3300 251.000 122.0 167.526 5.170 -999.990 -999.990 1.675 ..P WKT 2011 02 28 19 14 55 31.3200 -97.3300 251.000 457.0 168.255 3.090 -999.990 -999.990 1.683 ..P WKT 2011 02 28 19 24 55 31.3200 -97.3300 251.000 30.0 165.231 3.230 -999.990 -999.990 1.652 ..P WKT 2011 02 28 19 29 55 31.3200 -97.3300 251.000 122.0 168.022 2.730 -999.990 -999.990 1.680 ..P WKT 2011 02 28 19 34 55 31.3200 -97.3300 251.000 457.0 162.758 3.220 -999.990 -999.990 1.628 ..P WKT 2011 02 28 19 39 55 31.3200 -97.3300 251.000 30.0 165.884 3.680 -999.990 -999.990 1.659 ..P WKT 2011 02 28 19 44 55 31.3200 -97.3300 251.000 122.0 169.346 3.310 -999.990 -999.990 1.693 ..P WKT 2011 02 28 19 49 55 31.3200 -97.3300 251.000 457.0 165.425 2.340 -999.990 -999.990 1.654 ..P WKT 2011 02 28 19 59 55 31.3200 -97.3300 251.000 30.0 164.581 3.290 -999.990 -999.990 1.646 ..P WKT 2011 02 28 20 04 55 31.3200 -97.3300 251.000 122.0 165.981 3.070 -999.990 -999.990 1.660 ..P WKT 2011 02 28 20 09 55 31.3200 -97.3300 251.000 457.0 163.691 6.570 -999.990 -999.990 1.637 ..P WKT 2011 02 28 20 14 55 31.3200 -97.3300 251.000 30.0 157.710 3.360 -999.990 -999.990 1.577 ..P WKT 2011 02 28 20 19 55 31.3200 -97.3300 251.000 122.0 161.123 2.320 -999.990 -999.990 1.611 ..P WKT 2011 02 28 20 24 55 31.3200 -97.3300 251.000 457.0 157.492 2.650 -999.990 -999.990 1.575 ..P WKT 2011 02 28 20 34 55 31.3200 -97.3300 251.000 30.0 164.077 2.990 -999.990 -999.990 1.641 ..P WKT 2011 02 28 20 39 55 31.3200 -97.3300 251.000 122.0 157.858 1.760 -999.990 -999.990 1.579 ..P WKT 2011 02 28 20 44 55 31.3200 -97.3300 251.000 457.0 160.025 2.150 -999.990 -999.990 1.600 ..P WKT 2011 02 28 20 49 55 31.3200 -97.3300 251.000 30.0 156.154 2.240 -999.990 -999.990 1.562 ..P WKT 2011 02 28 20 54 55 31.3200 -97.3300 251.000 122.0 151.277 2.350 -999.990 -999.990 1.513 ..P WKT 2011 02 28 20 59 55 31.3200 -97.3300 251.000 457.0 154.785 2.020 -999.990 -999.990 1.548 ..P WKT 2011 02 28 21 09 55 31.3200 -97.3300 251.000 30.0 162.327 2.950 -999.990 -999.990 1.623 ..P WKT 2011 02 28 21 14 55 31.3200 -97.3300 251.000 122.0 152.948 2.070 -999.990 -999.990 1.529 ..P WKT 2011 02 28 21 19 55 31.3200 -97.3300 251.000 457.0 152.791 2.610 -999.990 -999.990 1.528 ..P WKT 2011 02 28 21 24 55 31.3200 -97.3300 251.000 30.0 154.479 2.800 -999.990 -999.990 1.545 ..P WKT 2011 02 28 21 29 55 31.3200 -97.3300 251.000 122.0 160.021 3.220 -999.990 -999.990 1.600 ..P WKT 2011 02 28 21 34 55 31.3200 -97.3300 251.000 457.0 158.691 2.550 -999.990 -999.990 1.587 ..P WKT 2011 02 28 21 44 55 31.3200 -97.3300 251.000 30.0 154.545 2.660 -999.990 -999.990 1.545 ..P WKT 2011 02 28 21 49 55 31.3200 -97.3300 251.000 122.0 150.389 2.740 -999.990 -999.990 1.504 ..P WKT 2011 02 28 21 54 55 31.3200 -97.3300 251.000 457.0 151.764 2.960 -999.990 -999.990 1.518 ..P WKT 2011 02 28 21 59 55 31.3200 -97.3300 251.000 30.0 153.810 3.550 -999.990 -999.990 1.538 ..P WKT 2011 02 28 22 04 55 31.3200 -97.3300 251.000 122.0 155.184 2.420 -999.990 -999.990 1.552 ..P WKT 2011 02 28 22 09 55 31.3200 -97.3300 251.000 457.0 146.505 3.690 -999.990 -999.990 1.465 ..P WKT 2011 02 28 22 19 55 31.3200 -97.3300 251.000 30.0 151.889 3.300 -999.990 -999.990 1.519 ..P WKT 2011 02 28 22 24 55 31.3200 -97.3300 251.000 122.0 155.729 4.370 -999.990 -999.990 1.557 ..P WKT 2011 02 28 22 29 55 31.3200 -97.3300 251.000 457.0 152.365 4.250 -999.990 -999.990 1.524 ..P WKT 2011 02 28 22 34 55 31.3200 -97.3300 251.000 30.0 152.184 3.040 -999.990 -999.990 1.522 ..P WKT 2011 02 28 22 39 55 31.3200 -97.3300 251.000 122.0 156.525 3.920 -999.990 -999.990 1.565 ..P WKT 2011 02 28 22 44 55 31.3200 -97.3300 251.000 457.0 149.979 3.160 -999.990 -999.990 1.500 ..P WKT 2011 02 28 22 54 55 31.3200 -97.3300 251.000 30.0 142.965 4.460 -999.990 -999.990 1.430 ..P WKT 2011 02 28 22 59 55 31.3200 -97.3300 251.000 122.0 149.198 3.310 -999.990 -999.990 1.492 ..P WKT 2011 02 28 23 04 55 31.3200 -97.3300 251.000 457.0 148.059 3.760 -999.990 -999.990 1.481 ..P WKT 2011 02 28 23 09 55 31.3200 -97.3300 251.000 30.0 148.597 4.030 -999.990 -999.990 1.486 ..P WKT 2011 02 28 23 14 55 31.3200 -97.3300 251.000 122.0 148.632 3.270 -999.990 -999.990 1.486 ..P WKT 2011 02 28 23 19 55 31.3200 -97.3300 251.000 457.0 148.163 3.340 -999.990 -999.990 1.482 ..P WKT 2011 02 28 23 29 55 31.3200 -97.3300 251.000 30.0 152.437 3.470 -999.990 -999.990 1.524 ..P WKT 2011 02 28 23 34 55 31.3200 -97.3300 251.000 122.0 152.657 3.010 -999.990 -999.990 1.527 ..P WKT 2011 02 28 23 39 55 31.3200 -97.3300 251.000 457.0 145.175 2.640 -999.990 -999.990 1.452 ..P WKT 2011 02 28 23 44 55 31.3200 -97.3300 251.000 30.0 145.060 3.100 -999.990 -999.990 1.451 ..P WKT 2011 02 28 23 49 55 31.3200 -97.3300 251.000 122.0 147.624 2.290 -999.990 -999.990 1.476 ..P