# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 07 01 00 09 55 31.3200 -97.3300 251.000 457.0 97.218 3.890 -999.990 -999.990 0.972 ..P WKT 2010 07 01 00 10 25 31.3200 -97.3300 251.000 457.0 96.215 4.480 -999.990 -999.990 0.962 ..P WKT 2010 07 01 00 10 55 31.3200 -97.3300 251.000 457.0 92.972 4.150 -999.990 -999.990 0.930 ..P WKT 2010 07 01 00 11 25 31.3200 -97.3300 251.000 457.0 89.729 4.370 -999.990 -999.990 0.897 ..P WKT 2010 07 01 00 11 55 31.3200 -97.3300 251.000 457.0 89.565 4.270 -999.990 -999.990 0.896 ..P WKT 2010 07 01 00 12 25 31.3200 -97.3300 251.000 457.0 87.722 3.850 -999.990 -999.990 0.877 ..P WKT 2010 07 01 00 12 55 31.3200 -97.3300 251.000 457.0 91.197 4.100 -999.990 -999.990 0.912 ..P WKT 2010 07 01 00 13 25 31.3200 -97.3300 251.000 457.0 93.552 4.310 -999.990 -999.990 0.936 ..P WKT 2010 07 01 00 13 55 31.3200 -97.3300 251.000 457.0 91.989 4.480 -999.990 -999.990 0.920 ..P WKT 2010 07 01 00 14 25 31.3200 -97.3300 251.000 457.0 97.143 4.990 -999.990 -999.990 0.971 ..P WKT 2010 07 01 00 14 55 31.3200 -97.3300 251.000 457.0 98.378 5.220 -999.990 -999.990 0.984 ..P WKT 2010 07 01 00 19 55 31.3200 -97.3300 251.000 30.0 102.897 4.950 -999.990 -999.990 1.029 ..P WKT 2010 07 01 00 24 55 31.3200 -97.3300 251.000 122.0 102.937 5.480 -999.990 -999.990 1.029 ..P WKT 2010 07 01 00 29 55 31.3200 -97.3300 251.000 457.0 100.459 4.550 -999.990 -999.990 1.005 ..P WKT 2010 07 01 00 34 55 31.3200 -97.3300 251.000 30.0 110.012 4.270 -999.990 -999.990 1.100 ..P WKT 2010 07 01 00 39 55 31.3200 -97.3300 251.000 122.0 113.688 4.490 -999.990 -999.990 1.137 ..P WKT 2010 07 01 00 44 55 31.3200 -97.3300 251.000 457.0 112.609 4.300 -999.990 -999.990 1.126 ..P WKT 2010 07 01 00 54 55 31.3200 -97.3300 251.000 30.0 127.500 5.220 -999.990 -999.990 1.275 ..P WKT 2010 07 01 00 59 55 31.3200 -97.3300 251.000 122.0 135.917 4.450 -999.990 -999.990 1.359 ..P WKT 2010 07 01 01 04 55 31.3200 -97.3300 251.000 457.0 108.259 5.410 -999.990 -999.990 1.083 ..P WKT 2010 07 01 01 09 55 31.3200 -97.3300 251.000 30.0 133.733 4.900 -999.990 -999.990 1.337 ..P WKT 2010 07 01 01 14 55 31.3200 -97.3300 251.000 122.0 140.470 3.450 -999.990 -999.990 1.405 ..P WKT 2010 07 01 01 19 55 31.3200 -97.3300 251.000 457.0 105.689 4.490 -999.990 -999.990 1.057 ..P WKT 2010 07 01 01 29 55 31.3200 -97.3300 251.000 30.0 138.790 3.270 -999.990 -999.990 1.388 ..P WKT 2010 07 01 01 34 55 31.3200 -97.3300 251.000 122.0 143.349 3.810 -999.990 -999.990 1.433 ..P WKT 2010 07 01 01 39 55 31.3200 -97.3300 251.000 457.0 102.212 3.770 -999.990 -999.990 1.022 ..P WKT 2010 07 01 01 44 55 31.3200 -97.3300 251.000 30.0 110.963 3.530 -999.990 -999.990 1.110 ..P WKT 2010 07 01 01 49 55 31.3200 -97.3300 251.000 122.0 106.581 4.140 -999.990 -999.990 1.066 ..P WKT 2010 07 01 01 54 55 31.3200 -97.3300 251.000 457.0 99.824 3.450 -999.990 -999.990 0.998 ..P WKT 2010 07 01 02 04 55 31.3200 -97.3300 251.000 30.0 96.711 3.390 -999.990 -999.990 0.967 ..P WKT 2010 07 01 02 09 55 31.3200 -97.3300 251.000 122.0 108.313 4.290 -999.990 -999.990 1.083 ..P WKT 2010 07 01 02 14 55 31.3200 -97.3300 251.000 457.0 103.155 3.880 -999.990 -999.990 1.032 ..P WKT 2010 07 01 02 19 55 31.3200 -97.3300 251.000 30.0 93.389 4.410 -999.990 -999.990 0.934 ..P WKT 2010 07 01 02 24 55 31.3200 -97.3300 251.000 122.0 98.006 3.820 -999.990 -999.990 0.980 ..P WKT 2010 07 01 02 29 55 31.3200 -97.3300 251.000 457.0 97.178 3.130 -999.990 -999.990 0.972 ..P WKT 2010 07 01 02 39 55 31.3200 -97.3300 251.000 30.0 95.642 3.090 -999.990 -999.990 0.956 ..P WKT 2010 07 01 02 44 55 31.3200 -97.3300 251.000 122.0 94.934 3.890 -999.990 -999.990 0.949 ..P WKT 2010 07 01 02 49 55 31.3200 -97.3300 251.000 457.0 78.036 3.660 -999.990 -999.990 0.780 ..P WKT 2010 07 01 02 54 55 31.3200 -97.3300 251.000 30.0 87.378 3.810 -999.990 -999.990 0.874 ..P WKT 2010 07 01 02 59 55 31.3200 -97.3300 251.000 122.0 96.439 3.840 -999.990 -999.990 0.964 ..P WKT 2010 07 01 03 04 55 31.3200 -97.3300 251.000 457.0 102.150 3.350 -999.990 -999.990 1.022 ..P WKT 2010 07 01 03 14 55 31.3200 -97.3300 251.000 30.0 101.969 3.270 -999.990 -999.990 1.020 ..P WKT 2010 07 01 03 19 55 31.3200 -97.3300 251.000 122.0 111.145 3.640 -999.990 -999.990 1.111 ..P WKT 2010 07 01 03 24 55 31.3200 -97.3300 251.000 457.0 99.118 4.050 -999.990 -999.990 0.991 ..P WKT 2010 07 01 03 29 55 31.3200 -97.3300 251.000 30.0 101.040 3.220 -999.990 -999.990 1.010 ..P WKT 2010 07 01 03 34 55 31.3200 -97.3300 251.000 122.0 111.330 3.000 -999.990 -999.990 1.113 ..P WKT 2010 07 01 03 39 55 31.3200 -97.3300 251.000 457.0 88.987 3.040 -999.990 -999.990 0.890 ..P WKT 2010 07 01 03 49 55 31.3200 -97.3300 251.000 30.0 106.217 3.260 -999.990 -999.990 1.062 ..P WKT 2010 07 01 03 54 55 31.3200 -97.3300 251.000 122.0 106.186 3.600 -999.990 -999.990 1.062 ..P WKT 2010 07 01 03 59 55 31.3200 -97.3300 251.000 457.0 92.215 3.820 -999.990 -999.990 0.922 ..P WKT 2010 07 01 04 04 55 31.3200 -97.3300 251.000 30.0 109.190 4.690 -999.990 -999.990 1.092 ..P WKT 2010 07 01 04 09 55 31.3200 -97.3300 251.000 122.0 111.111 4.000 -999.990 -999.990 1.111 ..P WKT 2010 07 01 04 14 55 31.3200 -97.3300 251.000 457.0 98.258 4.190 -999.990 -999.990 0.983 ..P WKT 2010 07 01 04 24 55 31.3200 -97.3300 251.000 30.0 121.049 4.190 -999.990 -999.990 1.210 ..P WKT 2010 07 01 04 29 55 31.3200 -97.3300 251.000 122.0 136.343 3.600 -999.990 -999.990 1.363 ..P WKT 2010 07 01 04 34 55 31.3200 -97.3300 251.000 457.0 96.745 3.270 -999.990 -999.990 0.967 ..P WKT 2010 07 01 04 39 55 31.3200 -97.3300 251.000 30.0 132.654 3.110 -999.990 -999.990 1.327 ..P WKT 2010 07 01 04 44 55 31.3200 -97.3300 251.000 122.0 122.592 3.180 -999.990 -999.990 1.226 ..P WKT 2010 07 01 04 49 55 31.3200 -97.3300 251.000 457.0 102.225 2.350 -999.990 -999.990 1.022 ..P WKT 2010 07 01 05 04 55 31.3200 -97.3300 251.000 30.0 130.375 2.730 -999.990 -999.990 1.304 ..P WKT 2010 07 01 05 09 55 31.3200 -97.3300 251.000 122.0 111.046 4.670 -999.990 -999.990 1.110 ..P WKT 2010 07 01 05 14 55 31.3200 -97.3300 251.000 457.0 90.607 2.640 -999.990 -999.990 0.906 ..P WKT 2010 07 01 05 19 55 31.3200 -97.3300 251.000 30.0 121.399 2.870 -999.990 -999.990 1.214 ..P WKT 2010 07 01 05 24 55 31.3200 -97.3300 251.000 122.0 114.047 2.400 -999.990 -999.990 1.140 ..P WKT 2010 07 01 05 29 55 31.3200 -97.3300 251.000 457.0 94.726 2.630 -999.990 -999.990 0.947 ..P WKT 2010 07 01 05 39 55 31.3200 -97.3300 251.000 30.0 120.189 3.470 -999.990 -999.990 1.202 ..P WKT 2010 07 01 05 44 55 31.3200 -97.3300 251.000 122.0 115.426 3.500 -999.990 -999.990 1.154 ..P WKT 2010 07 01 05 49 55 31.3200 -97.3300 251.000 457.0 86.594 4.500 -999.990 -999.990 0.866 ..P WKT 2010 07 01 05 54 55 31.3200 -97.3300 251.000 30.0 118.702 2.850 -999.990 -999.990 1.187 ..P WKT 2010 07 01 05 59 55 31.3200 -97.3300 251.000 122.0 109.349 3.140 -999.990 -999.990 1.093 ..P WKT 2010 07 01 06 04 55 31.3200 -97.3300 251.000 457.0 85.951 3.270 -999.990 -999.990 0.860 ..P WKT 2010 07 01 06 14 55 31.3200 -97.3300 251.000 30.0 113.687 3.160 -999.990 -999.990 1.137 ..P WKT 2010 07 01 06 19 55 31.3200 -97.3300 251.000 122.0 105.153 3.670 -999.990 -999.990 1.052 ..P WKT 2010 07 01 06 24 55 31.3200 -97.3300 251.000 457.0 89.251 3.790 -999.990 -999.990 0.893 ..P WKT 2010 07 01 06 29 55 31.3200 -97.3300 251.000 30.0 120.067 3.550 -999.990 -999.990 1.201 ..P WKT 2010 07 01 06 34 55 31.3200 -97.3300 251.000 122.0 119.877 4.280 -999.990 -999.990 1.199 ..P WKT 2010 07 01 06 39 55 31.3200 -97.3300 251.000 457.0 89.937 5.020 -999.990 -999.990 0.899 ..P WKT 2010 07 01 06 49 55 31.3200 -97.3300 251.000 30.0 114.718 4.830 -999.990 -999.990 1.147 ..P WKT 2010 07 01 06 54 55 31.3200 -97.3300 251.000 122.0 116.473 3.920 -999.990 -999.990 1.165 ..P WKT 2010 07 01 06 59 55 31.3200 -97.3300 251.000 457.0 89.880 3.930 -999.990 -999.990 0.899 ..P WKT 2010 07 01 07 04 55 31.3200 -97.3300 251.000 30.0 118.038 4.290 -999.990 -999.990 1.180 ..P WKT 2010 07 01 07 09 55 31.3200 -97.3300 251.000 122.0 117.569 4.230 -999.990 -999.990 1.176 ..P WKT 2010 07 01 07 14 55 31.3200 -97.3300 251.000 457.0 95.428 4.020 -999.990 -999.990 0.954 ..P WKT 2010 07 01 07 24 55 31.3200 -97.3300 251.000 30.0 119.498 4.130 -999.990 -999.990 1.195 ..P WKT 2010 07 01 07 29 55 31.3200 -97.3300 251.000 122.0 118.474 3.240 -999.990 -999.990 1.185 ..P WKT 2010 07 01 07 34 55 31.3200 -97.3300 251.000 457.0 88.842 3.230 -999.990 -999.990 0.888 ..P WKT 2010 07 01 07 39 55 31.3200 -97.3300 251.000 30.0 120.871 2.910 -999.990 -999.990 1.209 ..P WKT 2010 07 01 07 44 55 31.3200 -97.3300 251.000 122.0 115.125 3.270 -999.990 -999.990 1.151 ..P WKT 2010 07 01 07 49 55 31.3200 -97.3300 251.000 457.0 91.610 2.640 -999.990 -999.990 0.916 ..P WKT 2010 07 01 07 59 55 31.3200 -97.3300 251.000 30.0 112.294 2.020 -999.990 -999.990 1.123 ..P WKT 2010 07 01 08 04 55 31.3200 -97.3300 251.000 122.0 117.894 2.170 -999.990 -999.990 1.179 ..P WKT 2010 07 01 08 09 55 31.3200 -97.3300 251.000 457.0 95.458 2.370 -999.990 -999.990 0.955 ..P WKT 2010 07 01 08 14 55 31.3200 -97.3300 251.000 30.0 111.884 3.330 -999.990 -999.990 1.119 ..P WKT 2010 07 01 08 19 55 31.3200 -97.3300 251.000 122.0 110.266 3.640 -999.990 -999.990 1.103 ..P WKT 2010 07 01 08 24 55 31.3200 -97.3300 251.000 457.0 86.171 3.660 -999.990 -999.990 0.862 ..P WKT 2010 07 01 08 34 55 31.3200 -97.3300 251.000 30.0 110.689 2.870 -999.990 -999.990 1.107 ..P WKT 2010 07 01 08 39 55 31.3200 -97.3300 251.000 122.0 113.233 2.110 -999.990 -999.990 1.132 ..P WKT 2010 07 01 08 44 55 31.3200 -97.3300 251.000 457.0 79.715 5.730 -999.990 -999.990 0.797 ..P WKT 2010 07 01 08 49 55 31.3200 -97.3300 251.000 30.0 98.628 2.510 -999.990 -999.990 0.986 ..P WKT 2010 07 01 08 54 55 31.3200 -97.3300 251.000 122.0 103.947 2.470 -999.990 -999.990 1.039 ..P WKT 2010 07 01 08 59 55 31.3200 -97.3300 251.000 457.0 83.750 2.070 -999.990 -999.990 0.838 ..P WKT 2010 07 01 09 09 55 31.3200 -97.3300 251.000 30.0 107.124 3.290 -999.990 -999.990 1.071 ..P WKT 2010 07 01 09 14 55 31.3200 -97.3300 251.000 122.0 99.667 2.820 -999.990 -999.990 0.997 ..P WKT 2010 07 01 09 19 55 31.3200 -97.3300 251.000 457.0 84.448 3.880 -999.990 -999.990 0.844 ..P WKT 2010 07 01 09 24 55 31.3200 -97.3300 251.000 30.0 102.220 2.800 -999.990 -999.990 1.022 ..P WKT 2010 07 01 09 29 55 31.3200 -97.3300 251.000 122.0 103.913 2.790 -999.990 -999.990 1.039 ..P WKT 2010 07 01 09 34 55 31.3200 -97.3300 251.000 457.0 84.540 2.140 -999.990 -999.990 0.845 ..P WKT 2010 07 01 09 44 55 31.3200 -97.3300 251.000 30.0 100.773 3.060 -999.990 -999.990 1.008 ..P WKT 2010 07 01 09 49 55 31.3200 -97.3300 251.000 122.0 102.979 3.500 -999.990 -999.990 1.030 ..P WKT 2010 07 01 09 54 55 31.3200 -97.3300 251.000 457.0 85.929 3.750 -999.990 -999.990 0.859 ..P WKT 2010 07 01 09 59 55 31.3200 -97.3300 251.000 30.0 112.794 4.730 -999.990 -999.990 1.128 ..P WKT 2010 07 01 10 04 55 31.3200 -97.3300 251.000 122.0 113.475 3.430 -999.990 -999.990 1.135 ..P WKT 2010 07 01 10 09 55 31.3200 -97.3300 251.000 457.0 95.181 2.670 -999.990 -999.990 0.952 ..P WKT 2010 07 01 10 19 55 31.3200 -97.3300 251.000 30.0 117.397 2.910 -999.990 -999.990 1.174 ..P WKT 2010 07 01 10 24 55 31.3200 -97.3300 251.000 122.0 114.003 3.810 -999.990 -999.990 1.140 ..P WKT 2010 07 01 10 29 55 31.3200 -97.3300 251.000 457.0 99.533 4.050 -999.990 -999.990 0.995 ..P WKT 2010 07 01 10 34 55 31.3200 -97.3300 251.000 30.0 113.446 4.260 -999.990 -999.990 1.134 ..P WKT 2010 07 01 10 39 55 31.3200 -97.3300 251.000 122.0 114.482 2.730 -999.990 -999.990 1.145 ..P WKT 2010 07 01 10 44 55 31.3200 -97.3300 251.000 457.0 95.864 2.350 -999.990 -999.990 0.959 ..P WKT 2010 07 01 10 54 55 31.3200 -97.3300 251.000 30.0 117.156 2.380 -999.990 -999.990 1.172 ..P WKT 2010 07 01 10 59 55 31.3200 -97.3300 251.000 122.0 110.285 2.870 -999.990 -999.990 1.103 ..P WKT 2010 07 01 11 04 55 31.3200 -97.3300 251.000 457.0 85.013 2.460 -999.990 -999.990 0.850 ..P WKT 2010 07 01 11 09 55 31.3200 -97.3300 251.000 30.0 117.852 4.890 -999.990 -999.990 1.179 ..P WKT 2010 07 01 11 14 55 31.3200 -97.3300 251.000 122.0 118.038 2.550 -999.990 -999.990 1.180 ..P WKT 2010 07 01 11 19 55 31.3200 -97.3300 251.000 457.0 84.472 5.700 -999.990 -999.990 0.845 ..P WKT 2010 07 01 11 29 55 31.3200 -97.3300 251.000 30.0 109.981 2.690 -999.990 -999.990 1.100 ..P WKT 2010 07 01 11 34 55 31.3200 -97.3300 251.000 122.0 119.808 2.780 -999.990 -999.990 1.198 ..P WKT 2010 07 01 11 39 55 31.3200 -97.3300 251.000 457.0 86.215 3.070 -999.990 -999.990 0.862 ..P WKT 2010 07 01 11 44 55 31.3200 -97.3300 251.000 30.0 121.759 3.160 -999.990 -999.990 1.218 ..P WKT 2010 07 01 11 49 55 31.3200 -97.3300 251.000 122.0 121.905 3.300 -999.990 -999.990 1.219 ..P WKT 2010 07 01 12 09 55 31.3200 -97.3300 251.000 457.0 86.708 2.470 -999.990 -999.990 0.867 ..P WKT 2010 07 01 12 10 25 31.3200 -97.3300 251.000 457.0 89.785 3.370 -999.990 -999.990 0.898 ..P WKT 2010 07 01 12 10 55 31.3200 -97.3300 251.000 457.0 88.991 2.770 -999.990 -999.990 0.890 ..P WKT 2010 07 01 12 11 25 31.3200 -97.3300 251.000 457.0 91.792 3.150 -999.990 -999.990 0.918 ..P WKT 2010 07 01 12 11 55 31.3200 -97.3300 251.000 457.0 93.487 2.680 -999.990 -999.990 0.935 ..P WKT 2010 07 01 12 12 25 31.3200 -97.3300 251.000 457.0 93.246 2.540 -999.990 -999.990 0.932 ..P WKT 2010 07 01 12 12 55 31.3200 -97.3300 251.000 457.0 88.856 2.940 -999.990 -999.990 0.889 ..P WKT 2010 07 01 12 13 25 31.3200 -97.3300 251.000 457.0 91.105 2.770 -999.990 -999.990 0.911 ..P WKT 2010 07 01 12 13 55 31.3200 -97.3300 251.000 457.0 88.651 2.500 -999.990 -999.990 0.887 ..P WKT 2010 07 01 12 14 25 31.3200 -97.3300 251.000 457.0 85.368 2.490 -999.990 -999.990 0.854 ..P WKT 2010 07 01 12 14 55 31.3200 -97.3300 251.000 457.0 88.446 2.630 -999.990 -999.990 0.884 ..P WKT 2010 07 01 12 19 55 31.3200 -97.3300 251.000 30.0 128.356 2.820 -999.990 -999.990 1.284 ..P WKT 2010 07 01 12 24 55 31.3200 -97.3300 251.000 122.0 128.164 3.850 -999.990 -999.990 1.282 ..P WKT 2010 07 01 12 29 55 31.3200 -97.3300 251.000 457.0 90.620 3.570 -999.990 -999.990 0.906 ..P WKT 2010 07 01 12 34 55 31.3200 -97.3300 251.000 30.0 127.226 3.060 -999.990 -999.990 1.272 ..P WKT 2010 07 01 12 39 55 31.3200 -97.3300 251.000 122.0 122.328 2.760 -999.990 -999.990 1.223 ..P WKT 2010 07 01 12 44 55 31.3200 -97.3300 251.000 457.0 94.180 3.610 -999.990 -999.990 0.942 ..P WKT 2010 07 01 12 54 55 31.3200 -97.3300 251.000 30.0 123.060 4.220 -999.990 -999.990 1.231 ..P WKT 2010 07 01 12 59 55 31.3200 -97.3300 251.000 122.0 123.901 3.020 -999.990 -999.990 1.239 ..P WKT 2010 07 01 13 04 55 31.3200 -97.3300 251.000 457.0 88.052 3.220 -999.990 -999.990 0.881 ..P WKT 2010 07 01 13 09 55 31.3200 -97.3300 251.000 30.0 125.170 3.950 -999.990 -999.990 1.252 ..P WKT 2010 07 01 13 14 55 31.3200 -97.3300 251.000 122.0 122.549 2.910 -999.990 -999.990 1.225 ..P WKT 2010 07 01 13 19 55 31.3200 -97.3300 251.000 457.0 85.578 2.450 -999.990 -999.990 0.856 ..P WKT 2010 07 01 13 29 55 31.3200 -97.3300 251.000 30.0 118.070 3.110 -999.990 -999.990 1.181 ..P WKT 2010 07 01 13 34 55 31.3200 -97.3300 251.000 122.0 113.428 2.580 -999.990 -999.990 1.134 ..P WKT 2010 07 01 13 39 55 31.3200 -97.3300 251.000 457.0 90.216 3.480 -999.990 -999.990 0.902 ..P WKT 2010 07 01 13 44 55 31.3200 -97.3300 251.000 30.0 116.755 2.420 -999.990 -999.990 1.168 ..P WKT 2010 07 01 13 49 55 31.3200 -97.3300 251.000 122.0 115.023 2.060 -999.990 -999.990 1.150 ..P WKT 2010 07 01 13 54 55 31.3200 -97.3300 251.000 457.0 83.068 2.130 -999.990 -999.990 0.831 ..P WKT 2010 07 01 14 04 55 31.3200 -97.3300 251.000 30.0 119.985 2.340 -999.990 -999.990 1.200 ..P WKT 2010 07 01 14 09 55 31.3200 -97.3300 251.000 122.0 110.942 3.000 -999.990 -999.990 1.109 ..P WKT 2010 07 01 14 14 55 31.3200 -97.3300 251.000 457.0 87.333 3.030 -999.990 -999.990 0.873 ..P WKT 2010 07 01 14 19 55 31.3200 -97.3300 251.000 30.0 106.165 2.970 -999.990 -999.990 1.062 ..P WKT 2010 07 01 14 24 55 31.3200 -97.3300 251.000 122.0 111.823 3.290 -999.990 -999.990 1.118 ..P WKT 2010 07 01 14 29 55 31.3200 -97.3300 251.000 457.0 98.611 3.300 -999.990 -999.990 0.986 ..P WKT 2010 07 01 14 39 55 31.3200 -97.3300 251.000 30.0 109.830 3.570 -999.990 -999.990 1.098 ..P WKT 2010 07 01 14 44 55 31.3200 -97.3300 251.000 122.0 115.391 3.150 -999.990 -999.990 1.154 ..P WKT 2010 07 01 14 49 55 31.3200 -97.3300 251.000 457.0 103.324 2.950 -999.990 -999.990 1.033 ..P WKT 2010 07 01 14 54 55 31.3200 -97.3300 251.000 30.0 108.469 3.610 -999.990 -999.990 1.085 ..P WKT 2010 07 01 14 59 55 31.3200 -97.3300 251.000 122.0 109.312 2.960 -999.990 -999.990 1.093 ..P WKT 2010 07 01 15 04 55 31.3200 -97.3300 251.000 457.0 109.322 2.610 -999.990 -999.990 1.093 ..P WKT 2010 07 01 15 14 55 31.3200 -97.3300 251.000 30.0 112.991 3.130 -999.990 -999.990 1.130 ..P WKT 2010 07 01 15 19 55 31.3200 -97.3300 251.000 122.0 120.126 4.200 -999.990 -999.990 1.201 ..P WKT 2010 07 01 15 24 55 31.3200 -97.3300 251.000 457.0 103.087 3.410 -999.990 -999.990 1.031 ..P WKT 2010 07 01 15 29 55 31.3200 -97.3300 251.000 30.0 111.612 2.860 -999.990 -999.990 1.116 ..P WKT 2010 07 01 15 34 55 31.3200 -97.3300 251.000 122.0 112.078 2.650 -999.990 -999.990 1.121 ..P WKT 2010 07 01 15 39 55 31.3200 -97.3300 251.000 457.0 100.591 2.430 -999.990 -999.990 1.006 ..P WKT 2010 07 01 15 49 55 31.3200 -97.3300 251.000 30.0 109.664 3.280 -999.990 -999.990 1.097 ..P WKT 2010 07 01 15 54 55 31.3200 -97.3300 251.000 122.0 113.269 3.100 -999.990 -999.990 1.133 ..P WKT 2010 07 01 15 59 55 31.3200 -97.3300 251.000 457.0 99.353 2.600 -999.990 -999.990 0.994 ..P WKT 2010 07 01 16 04 55 31.3200 -97.3300 251.000 30.0 102.123 3.550 -999.990 -999.990 1.021 ..P WKT 2010 07 01 16 09 55 31.3200 -97.3300 251.000 122.0 106.285 3.090 -999.990 -999.990 1.063 ..P WKT 2010 07 01 16 14 55 31.3200 -97.3300 251.000 457.0 105.161 2.890 -999.990 -999.990 1.052 ..P WKT 2010 07 01 16 24 55 31.3200 -97.3300 251.000 30.0 96.512 3.110 -999.990 -999.990 0.965 ..P WKT 2010 07 01 16 29 55 31.3200 -97.3300 251.000 122.0 111.808 3.030 -999.990 -999.990 1.118 ..P WKT 2010 07 01 16 34 55 31.3200 -97.3300 251.000 457.0 107.066 4.820 -999.990 -999.990 1.071 ..P WKT 2010 07 01 16 39 55 31.3200 -97.3300 251.000 30.0 110.953 5.850 -999.990 -999.990 1.110 ..P WKT 2010 07 01 16 44 55 31.3200 -97.3300 251.000 122.0 121.801 5.290 -999.990 -999.990 1.218 ..P WKT 2010 07 01 16 49 55 31.3200 -97.3300 251.000 457.0 109.262 3.610 -999.990 -999.990 1.093 ..P WKT 2010 07 01 17 04 55 31.3200 -97.3300 251.000 30.0 115.359 5.670 -999.990 -999.990 1.154 ..P WKT 2010 07 01 17 09 55 31.3200 -97.3300 251.000 122.0 118.553 5.930 -999.990 -999.990 1.186 ..P WKT 2010 07 01 17 14 55 31.3200 -97.3300 251.000 457.0 100.851 5.740 -999.990 -999.990 1.009 ..P WKT 2010 07 01 17 19 55 31.3200 -97.3300 251.000 30.0 104.462 4.260 -999.990 -999.990 1.045 ..P WKT 2010 07 01 17 24 55 31.3200 -97.3300 251.000 122.0 107.517 4.820 -999.990 -999.990 1.075 ..P WKT 2010 07 01 17 29 55 31.3200 -97.3300 251.000 457.0 100.956 3.040 -999.990 -999.990 1.010 ..P WKT 2010 07 01 17 39 55 31.3200 -97.3300 251.000 30.0 106.370 3.950 -999.990 -999.990 1.064 ..P WKT 2010 07 01 17 44 55 31.3200 -97.3300 251.000 122.0 104.686 3.890 -999.990 -999.990 1.047 ..P WKT 2010 07 01 17 49 55 31.3200 -97.3300 251.000 457.0 94.357 3.480 -999.990 -999.990 0.944 ..P WKT 2010 07 01 17 54 55 31.3200 -97.3300 251.000 30.0 96.855 4.790 -999.990 -999.990 0.969 ..P WKT 2010 07 01 17 59 55 31.3200 -97.3300 251.000 122.0 103.956 4.430 -999.990 -999.990 1.040 ..P WKT 2010 07 01 18 04 55 31.3200 -97.3300 251.000 457.0 86.090 4.370 -999.990 -999.990 0.861 ..P WKT 2010 07 01 18 14 55 31.3200 -97.3300 251.000 30.0 94.196 4.380 -999.990 -999.990 0.942 ..P WKT 2010 07 01 18 19 55 31.3200 -97.3300 251.000 122.0 101.898 4.510 -999.990 -999.990 1.019 ..P WKT 2010 07 01 18 24 55 31.3200 -97.3300 251.000 457.0 97.461 4.600 -999.990 -999.990 0.975 ..P WKT 2010 07 01 18 29 55 31.3200 -97.3300 251.000 30.0 98.606 3.900 -999.990 -999.990 0.986 ..P WKT 2010 07 01 18 34 55 31.3200 -97.3300 251.000 122.0 107.149 4.400 -999.990 -999.990 1.071 ..P WKT 2010 07 01 18 39 55 31.3200 -97.3300 251.000 457.0 99.500 4.130 -999.990 -999.990 0.995 ..P WKT 2010 07 01 18 49 55 31.3200 -97.3300 251.000 30.0 98.240 4.240 -999.990 -999.990 0.982 ..P WKT 2010 07 01 18 54 55 31.3200 -97.3300 251.000 122.0 100.862 4.990 -999.990 -999.990 1.009 ..P WKT 2010 07 01 18 59 55 31.3200 -97.3300 251.000 457.0 87.561 4.330 -999.990 -999.990 0.876 ..P WKT 2010 07 01 19 04 55 31.3200 -97.3300 251.000 30.0 98.145 4.680 -999.990 -999.990 0.981 ..P WKT 2010 07 01 19 09 55 31.3200 -97.3300 251.000 122.0 100.348 5.040 -999.990 -999.990 1.003 ..P WKT 2010 07 01 19 14 55 31.3200 -97.3300 251.000 457.0 93.889 5.130 -999.990 -999.990 0.939 ..P WKT 2010 07 01 19 24 55 31.3200 -97.3300 251.000 30.0 99.834 5.460 -999.990 -999.990 0.998 ..P WKT 2010 07 01 19 29 55 31.3200 -97.3300 251.000 122.0 103.018 5.060 -999.990 -999.990 1.030 ..P WKT 2010 07 01 19 34 55 31.3200 -97.3300 251.000 457.0 93.341 4.360 -999.990 -999.990 0.933 ..P WKT 2010 07 01 19 39 55 31.3200 -97.3300 251.000 30.0 91.491 4.960 -999.990 -999.990 0.915 ..P WKT 2010 07 01 19 44 55 31.3200 -97.3300 251.000 122.0 99.709 4.140 -999.990 -999.990 0.997 ..P WKT 2010 07 01 19 49 55 31.3200 -97.3300 251.000 457.0 92.825 5.340 -999.990 -999.990 0.928 ..P WKT 2010 07 01 19 59 55 31.3200 -97.3300 251.000 30.0 92.041 3.400 -999.990 -999.990 0.920 ..P WKT 2010 07 01 20 04 55 31.3200 -97.3300 251.000 122.0 94.507 4.260 -999.990 -999.990 0.945 ..P WKT 2010 07 01 20 09 55 31.3200 -97.3300 251.000 457.0 91.096 4.660 -999.990 -999.990 0.911 ..P WKT 2010 07 01 20 14 55 31.3200 -97.3300 251.000 30.0 96.081 5.250 -999.990 -999.990 0.961 ..P WKT 2010 07 01 20 19 55 31.3200 -97.3300 251.000 122.0 102.187 5.220 -999.990 -999.990 1.022 ..P WKT 2010 07 01 20 24 55 31.3200 -97.3300 251.000 457.0 99.336 4.210 -999.990 -999.990 0.993 ..P WKT 2010 07 01 20 34 55 31.3200 -97.3300 251.000 30.0 97.854 3.930 -999.990 -999.990 0.979 ..P WKT 2010 07 01 20 39 55 31.3200 -97.3300 251.000 122.0 102.862 5.370 -999.990 -999.990 1.029 ..P WKT 2010 07 01 20 44 55 31.3200 -97.3300 251.000 457.0 93.309 5.410 -999.990 -999.990 0.933 ..P WKT 2010 07 01 20 49 55 31.3200 -97.3300 251.000 30.0 89.075 4.690 -999.990 -999.990 0.891 ..P WKT 2010 07 01 20 54 55 31.3200 -97.3300 251.000 122.0 85.680 4.370 -999.990 -999.990 0.857 ..P WKT 2010 07 01 20 59 55 31.3200 -97.3300 251.000 457.0 76.542 3.590 -999.990 -999.990 0.765 ..P WKT 2010 07 01 21 09 55 31.3200 -97.3300 251.000 30.0 78.535 3.800 -999.990 -999.990 0.785 ..P WKT 2010 07 01 21 14 55 31.3200 -97.3300 251.000 122.0 74.257 4.820 -999.990 -999.990 0.743 ..P WKT 2010 07 01 21 19 55 31.3200 -97.3300 251.000 457.0 76.565 5.340 -999.990 -999.990 0.766 ..P WKT 2010 07 01 21 24 55 31.3200 -97.3300 251.000 30.0 80.275 4.150 -999.990 -999.990 0.803 ..P WKT 2010 07 01 21 29 55 31.3200 -97.3300 251.000 122.0 88.893 3.630 -999.990 -999.990 0.889 ..P WKT 2010 07 01 21 34 55 31.3200 -97.3300 251.000 457.0 76.763 3.820 -999.990 -999.990 0.768 ..P WKT 2010 07 01 21 44 55 31.3200 -97.3300 251.000 30.0 94.544 4.050 -999.990 -999.990 0.945 ..P WKT 2010 07 01 21 49 55 31.3200 -97.3300 251.000 122.0 96.556 5.630 -999.990 -999.990 0.966 ..P WKT 2010 07 01 21 54 55 31.3200 -97.3300 251.000 457.0 94.360 4.030 -999.990 -999.990 0.944 ..P WKT 2010 07 01 21 59 55 31.3200 -97.3300 251.000 30.0 90.619 3.710 -999.990 -999.990 0.906 ..P WKT 2010 07 01 22 04 55 31.3200 -97.3300 251.000 122.0 91.789 3.750 -999.990 -999.990 0.918 ..P WKT 2010 07 01 22 09 55 31.3200 -97.3300 251.000 457.0 81.594 3.720 -999.990 -999.990 0.816 ..P WKT 2010 07 01 22 19 55 31.3200 -97.3300 251.000 30.0 88.144 4.010 -999.990 -999.990 0.881 ..P WKT 2010 07 01 22 24 55 31.3200 -97.3300 251.000 122.0 93.244 4.060 -999.990 -999.990 0.932 ..P WKT 2010 07 01 22 29 55 31.3200 -97.3300 251.000 457.0 89.641 4.220 -999.990 -999.990 0.896 ..P WKT 2010 07 01 22 34 55 31.3200 -97.3300 251.000 30.0 94.604 4.140 -999.990 -999.990 0.946 ..P WKT 2010 07 01 22 39 55 31.3200 -97.3300 251.000 122.0 95.494 5.860 -999.990 -999.990 0.955 ..P WKT 2010 07 01 22 44 55 31.3200 -97.3300 251.000 457.0 89.223 4.120 -999.990 -999.990 0.892 ..P WKT 2010 07 01 22 54 55 31.3200 -97.3300 251.000 30.0 97.364 3.970 -999.990 -999.990 0.974 ..P WKT 2010 07 01 22 59 55 31.3200 -97.3300 251.000 122.0 92.817 4.380 -999.990 -999.990 0.928 ..P WKT 2010 07 01 23 04 55 31.3200 -97.3300 251.000 457.0 86.442 4.690 -999.990 -999.990 0.864 ..P WKT 2010 07 01 23 09 55 31.3200 -97.3300 251.000 30.0 95.803 5.710 -999.990 -999.990 0.958 ..P WKT 2010 07 01 23 14 55 31.3200 -97.3300 251.000 122.0 94.206 4.460 -999.990 -999.990 0.942 ..P WKT 2010 07 01 23 19 55 31.3200 -97.3300 251.000 457.0 88.671 4.370 -999.990 -999.990 0.887 ..P WKT 2010 07 01 23 29 55 31.3200 -97.3300 251.000 30.0 89.907 4.600 -999.990 -999.990 0.899 ..P WKT 2010 07 01 23 34 55 31.3200 -97.3300 251.000 122.0 90.210 4.600 -999.990 -999.990 0.902 ..P WKT 2010 07 01 23 39 55 31.3200 -97.3300 251.000 457.0 89.670 4.350 -999.990 -999.990 0.897 ..P WKT 2010 07 01 23 44 55 31.3200 -97.3300 251.000 30.0 83.224 4.740 -999.990 -999.990 0.832 ..P WKT 2010 07 01 23 49 55 31.3200 -97.3300 251.000 122.0 87.746 5.910 -999.990 -999.990 0.877 ..P WKT 2010 07 02 00 09 55 31.3200 -97.3300 251.000 457.0 85.136 4.760 -999.990 -999.990 0.851 ..P WKT 2010 07 02 00 10 25 31.3200 -97.3300 251.000 457.0 90.236 4.240 -999.990 -999.990 0.902 ..P WKT 2010 07 02 00 10 55 31.3200 -97.3300 251.000 457.0 86.896 5.330 -999.990 -999.990 0.869 ..P WKT 2010 07 02 00 11 25 31.3200 -97.3300 251.000 457.0 84.400 4.450 -999.990 -999.990 0.844 ..P WKT 2010 07 02 00 11 55 31.3200 -97.3300 251.000 457.0 87.249 4.190 -999.990 -999.990 0.872 ..P WKT 2010 07 02 00 12 25 31.3200 -97.3300 251.000 457.0 85.879 4.620 -999.990 -999.990 0.859 ..P WKT 2010 07 02 00 12 55 31.3200 -97.3300 251.000 457.0 81.131 4.440 -999.990 -999.990 0.811 ..P WKT 2010 07 02 00 13 25 31.3200 -97.3300 251.000 457.0 84.824 4.360 -999.990 -999.990 0.848 ..P WKT 2010 07 02 00 13 55 31.3200 -97.3300 251.000 457.0 84.579 4.110 -999.990 -999.990 0.846 ..P WKT 2010 07 02 00 14 25 31.3200 -97.3300 251.000 457.0 90.523 5.330 -999.990 -999.990 0.905 ..P WKT 2010 07 02 00 14 55 31.3200 -97.3300 251.000 457.0 91.122 4.580 -999.990 -999.990 0.911 ..P WKT 2010 07 02 00 19 55 31.3200 -97.3300 251.000 30.0 84.447 4.560 -999.990 -999.990 0.844 ..P WKT 2010 07 02 00 24 55 31.3200 -97.3300 251.000 122.0 97.184 4.880 -999.990 -999.990 0.972 ..P WKT 2010 07 02 00 29 55 31.3200 -97.3300 251.000 457.0 94.729 4.650 -999.990 -999.990 0.947 ..P WKT 2010 07 02 00 34 55 31.3200 -97.3300 251.000 30.0 91.430 4.320 -999.990 -999.990 0.914 ..P WKT 2010 07 02 00 39 55 31.3200 -97.3300 251.000 122.0 96.008 4.540 -999.990 -999.990 0.960 ..P WKT 2010 07 02 00 44 55 31.3200 -97.3300 251.000 457.0 94.116 4.090 -999.990 -999.990 0.941 ..P WKT 2010 07 02 00 54 55 31.3200 -97.3300 251.000 30.0 88.120 4.450 -999.990 -999.990 0.881 ..P WKT 2010 07 02 00 59 55 31.3200 -97.3300 251.000 122.0 92.313 4.280 -999.990 -999.990 0.923 ..P WKT 2010 07 02 01 04 55 31.3200 -97.3300 251.000 457.0 86.382 4.310 -999.990 -999.990 0.864 ..P WKT 2010 07 02 01 09 55 31.3200 -97.3300 251.000 30.0 95.637 4.660 -999.990 -999.990 0.956 ..P WKT 2010 07 02 01 14 55 31.3200 -97.3300 251.000 122.0 92.236 4.250 -999.990 -999.990 0.922 ..P WKT 2010 07 02 01 19 55 31.3200 -97.3300 251.000 457.0 91.367 5.060 -999.990 -999.990 0.914 ..P WKT 2010 07 02 01 29 55 31.3200 -97.3300 251.000 30.0 94.349 4.400 -999.990 -999.990 0.943 ..P WKT 2010 07 02 01 34 55 31.3200 -97.3300 251.000 122.0 96.091 4.430 -999.990 -999.990 0.961 ..P WKT 2010 07 02 01 39 55 31.3200 -97.3300 251.000 457.0 86.163 4.200 -999.990 -999.990 0.862 ..P WKT 2010 07 02 01 44 55 31.3200 -97.3300 251.000 30.0 92.404 4.560 -999.990 -999.990 0.924 ..P WKT 2010 07 02 01 49 55 31.3200 -97.3300 251.000 122.0 92.880 4.940 -999.990 -999.990 0.929 ..P WKT 2010 07 02 01 54 55 31.3200 -97.3300 251.000 457.0 91.529 3.850 -999.990 -999.990 0.915 ..P WKT 2010 07 02 02 04 55 31.3200 -97.3300 251.000 30.0 97.765 4.560 -999.990 -999.990 0.978 ..P WKT 2010 07 02 02 09 55 31.3200 -97.3300 251.000 122.0 95.087 5.760 -999.990 -999.990 0.951 ..P WKT 2010 07 02 02 14 55 31.3200 -97.3300 251.000 457.0 91.709 4.530 -999.990 -999.990 0.917 ..P WKT 2010 07 02 02 19 55 31.3200 -97.3300 251.000 30.0 95.357 5.390 -999.990 -999.990 0.954 ..P WKT 2010 07 02 02 24 55 31.3200 -97.3300 251.000 122.0 105.191 4.410 -999.990 -999.990 1.052 ..P WKT 2010 07 02 02 29 55 31.3200 -97.3300 251.000 457.0 98.017 4.290 -999.990 -999.990 0.980 ..P WKT 2010 07 02 02 39 55 31.3200 -97.3300 251.000 30.0 96.801 4.560 -999.990 -999.990 0.968 ..P WKT 2010 07 02 02 44 55 31.3200 -97.3300 251.000 122.0 103.602 4.290 -999.990 -999.990 1.036 ..P WKT 2010 07 02 02 49 55 31.3200 -97.3300 251.000 457.0 95.223 4.650 -999.990 -999.990 0.952 ..P WKT 2010 07 02 02 54 55 31.3200 -97.3300 251.000 30.0 100.337 4.920 -999.990 -999.990 1.003 ..P WKT 2010 07 02 02 59 55 31.3200 -97.3300 251.000 122.0 97.582 5.580 -999.990 -999.990 0.976 ..P WKT 2010 07 02 03 04 55 31.3200 -97.3300 251.000 457.0 79.226 5.610 -999.990 -999.990 0.792 ..P WKT 2010 07 02 03 14 55 31.3200 -97.3300 251.000 30.0 104.168 5.480 -999.990 -999.990 1.042 ..P WKT 2010 07 02 03 19 55 31.3200 -97.3300 251.000 122.0 104.745 5.180 -999.990 -999.990 1.047 ..P WKT 2010 07 02 03 24 55 31.3200 -97.3300 251.000 457.0 97.172 4.940 -999.990 -999.990 0.972 ..P WKT 2010 07 02 03 29 55 31.3200 -97.3300 251.000 30.0 97.748 4.310 -999.990 -999.990 0.977 ..P WKT 2010 07 02 03 34 55 31.3200 -97.3300 251.000 122.0 98.886 3.950 -999.990 -999.990 0.989 ..P WKT 2010 07 02 03 39 55 31.3200 -97.3300 251.000 457.0 85.132 3.870 -999.990 -999.990 0.851 ..P WKT 2010 07 02 03 49 55 31.3200 -97.3300 251.000 30.0 98.047 3.480 -999.990 -999.990 0.980 ..P WKT 2010 07 02 03 54 55 31.3200 -97.3300 251.000 122.0 98.302 3.530 -999.990 -999.990 0.983 ..P WKT 2010 07 02 03 59 55 31.3200 -97.3300 251.000 457.0 72.708 4.630 -999.990 -999.990 0.727 ..P WKT 2010 07 02 04 04 55 31.3200 -97.3300 251.000 30.0 103.308 3.710 -999.990 -999.990 1.033 ..P WKT 2010 07 02 04 09 55 31.3200 -97.3300 251.000 122.0 102.439 3.850 -999.990 -999.990 1.024 ..P WKT 2010 07 02 04 14 55 31.3200 -97.3300 251.000 457.0 78.252 3.860 -999.990 -999.990 0.783 ..P WKT 2010 07 02 04 24 55 31.3200 -97.3300 251.000 30.0 100.314 3.960 -999.990 -999.990 1.003 ..P WKT 2010 07 02 04 29 55 31.3200 -97.3300 251.000 122.0 95.995 4.310 -999.990 -999.990 0.960 ..P WKT 2010 07 02 04 34 55 31.3200 -97.3300 251.000 457.0 86.338 5.460 -999.990 -999.990 0.863 ..P WKT 2010 07 02 04 39 55 31.3200 -97.3300 251.000 30.0 95.502 4.050 -999.990 -999.990 0.955 ..P WKT 2010 07 02 04 44 55 31.3200 -97.3300 251.000 122.0 97.643 4.390 -999.990 -999.990 0.976 ..P WKT 2010 07 02 04 49 55 31.3200 -97.3300 251.000 457.0 87.566 4.070 -999.990 -999.990 0.876 ..P WKT 2010 07 02 05 04 55 31.3200 -97.3300 251.000 30.0 95.916 4.290 -999.990 -999.990 0.959 ..P WKT 2010 07 02 05 09 55 31.3200 -97.3300 251.000 122.0 96.702 6.330 -999.990 -999.990 0.967 ..P WKT 2010 07 02 05 14 55 31.3200 -97.3300 251.000 457.0 82.184 4.500 -999.990 -999.990 0.822 ..P WKT 2010 07 02 05 19 55 31.3200 -97.3300 251.000 30.0 93.923 4.510 -999.990 -999.990 0.939 ..P WKT 2010 07 02 05 24 55 31.3200 -97.3300 251.000 122.0 88.812 4.130 -999.990 -999.990 0.888 ..P WKT 2010 07 02 05 29 55 31.3200 -97.3300 251.000 457.0 84.124 5.420 -999.990 -999.990 0.841 ..P WKT 2010 07 02 05 39 55 31.3200 -97.3300 251.000 30.0 87.794 3.950 -999.990 -999.990 0.878 ..P WKT 2010 07 02 05 44 55 31.3200 -97.3300 251.000 122.0 87.307 4.420 -999.990 -999.990 0.873 ..P WKT 2010 07 02 05 49 55 31.3200 -97.3300 251.000 457.0 80.223 4.380 -999.990 -999.990 0.802 ..P WKT 2010 07 02 05 54 55 31.3200 -97.3300 251.000 30.0 88.300 5.470 -999.990 -999.990 0.883 ..P WKT 2010 07 02 05 59 55 31.3200 -97.3300 251.000 122.0 92.586 4.440 -999.990 -999.990 0.926 ..P WKT 2010 07 02 06 04 55 31.3200 -97.3300 251.000 457.0 81.290 6.180 -999.990 -999.990 0.813 ..P WKT 2010 07 02 06 14 55 31.3200 -97.3300 251.000 30.0 89.542 3.500 -999.990 -999.990 0.895 ..P WKT 2010 07 02 06 19 55 31.3200 -97.3300 251.000 122.0 89.577 4.820 -999.990 -999.990 0.896 ..P WKT 2010 07 02 06 24 55 31.3200 -97.3300 251.000 457.0 85.962 5.180 -999.990 -999.990 0.860 ..P WKT 2010 07 02 06 29 55 31.3200 -97.3300 251.000 30.0 88.102 4.710 -999.990 -999.990 0.881 ..P WKT 2010 07 02 06 34 55 31.3200 -97.3300 251.000 122.0 86.874 4.110 -999.990 -999.990 0.869 ..P WKT 2010 07 02 06 39 55 31.3200 -97.3300 251.000 457.0 82.558 4.930 -999.990 -999.990 0.826 ..P WKT 2010 07 02 06 49 55 31.3200 -97.3300 251.000 30.0 83.810 5.560 -999.990 -999.990 0.838 ..P WKT 2010 07 02 06 54 55 31.3200 -97.3300 251.000 122.0 80.678 4.220 -999.990 -999.990 0.807 ..P WKT 2010 07 02 06 59 55 31.3200 -97.3300 251.000 457.0 79.791 4.560 -999.990 -999.990 0.798 ..P WKT 2010 07 02 07 04 55 31.3200 -97.3300 251.000 30.0 88.446 4.060 -999.990 -999.990 0.884 ..P WKT 2010 07 02 07 09 55 31.3200 -97.3300 251.000 122.0 87.839 3.700 -999.990 -999.990 0.878 ..P WKT 2010 07 02 07 14 55 31.3200 -97.3300 251.000 457.0 81.340 3.610 -999.990 -999.990 0.813 ..P WKT 2010 07 02 07 24 55 31.3200 -97.3300 251.000 30.0 86.241 3.270 -999.990 -999.990 0.862 ..P WKT 2010 07 02 07 29 55 31.3200 -97.3300 251.000 122.0 85.854 3.130 -999.990 -999.990 0.859 ..P WKT 2010 07 02 07 34 55 31.3200 -97.3300 251.000 457.0 83.223 3.290 -999.990 -999.990 0.832 ..P WKT 2010 07 02 07 39 55 31.3200 -97.3300 251.000 30.0 93.781 2.950 -999.990 -999.990 0.938 ..P WKT 2010 07 02 07 44 55 31.3200 -97.3300 251.000 122.0 94.797 2.940 -999.990 -999.990 0.948 ..P WKT 2010 07 02 07 49 55 31.3200 -97.3300 251.000 457.0 85.152 4.310 -999.990 -999.990 0.852 ..P WKT 2010 07 02 07 59 55 31.3200 -97.3300 251.000 30.0 82.416 2.860 -999.990 -999.990 0.824 ..P WKT 2010 07 02 08 04 55 31.3200 -97.3300 251.000 122.0 93.253 3.500 -999.990 -999.990 0.933 ..P WKT 2010 07 02 08 09 55 31.3200 -97.3300 251.000 457.0 83.889 3.730 -999.990 -999.990 0.839 ..P WKT 2010 07 02 08 14 55 31.3200 -97.3300 251.000 30.0 89.675 3.230 -999.990 -999.990 0.897 ..P WKT 2010 07 02 08 19 55 31.3200 -97.3300 251.000 122.0 97.424 3.660 -999.990 -999.990 0.974 ..P WKT 2010 07 02 08 24 55 31.3200 -97.3300 251.000 457.0 81.610 2.600 -999.990 -999.990 0.816 ..P WKT 2010 07 02 08 34 55 31.3200 -97.3300 251.000 30.0 99.452 2.770 -999.990 -999.990 0.995 ..P WKT 2010 07 02 08 39 55 31.3200 -97.3300 251.000 122.0 96.921 4.280 -999.990 -999.990 0.969 ..P WKT 2010 07 02 08 44 55 31.3200 -97.3300 251.000 457.0 84.294 3.700 -999.990 -999.990 0.843 ..P WKT 2010 07 02 08 49 55 31.3200 -97.3300 251.000 30.0 87.655 3.050 -999.990 -999.990 0.877 ..P WKT 2010 07 02 08 54 55 31.3200 -97.3300 251.000 122.0 93.258 3.150 -999.990 -999.990 0.933 ..P WKT 2010 07 02 08 59 55 31.3200 -97.3300 251.000 457.0 89.607 2.950 -999.990 -999.990 0.896 ..P WKT 2010 07 02 09 09 55 31.3200 -97.3300 251.000 30.0 90.057 3.360 -999.990 -999.990 0.901 ..P WKT 2010 07 02 09 14 55 31.3200 -97.3300 251.000 122.0 95.140 4.250 -999.990 -999.990 0.951 ..P WKT 2010 07 02 09 19 55 31.3200 -97.3300 251.000 457.0 82.836 3.010 -999.990 -999.990 0.828 ..P WKT 2010 07 02 09 24 55 31.3200 -97.3300 251.000 30.0 83.713 5.190 -999.990 -999.990 0.837 ..P WKT 2010 07 02 09 29 55 31.3200 -97.3300 251.000 122.0 96.085 3.020 -999.990 -999.990 0.961 ..P WKT 2010 07 02 09 34 55 31.3200 -97.3300 251.000 457.0 88.409 3.720 -999.990 -999.990 0.884 ..P WKT 2010 07 02 09 44 55 31.3200 -97.3300 251.000 30.0 90.542 2.820 -999.990 -999.990 0.905 ..P WKT 2010 07 02 09 49 55 31.3200 -97.3300 251.000 122.0 91.237 4.300 -999.990 -999.990 0.912 ..P WKT 2010 07 02 09 54 55 31.3200 -97.3300 251.000 457.0 83.942 3.910 -999.990 -999.990 0.839 ..P WKT 2010 07 02 09 59 55 31.3200 -97.3300 251.000 30.0 88.142 3.130 -999.990 -999.990 0.881 ..P WKT 2010 07 02 10 04 55 31.3200 -97.3300 251.000 122.0 95.567 2.850 -999.990 -999.990 0.956 ..P WKT 2010 07 02 10 09 55 31.3200 -97.3300 251.000 457.0 85.329 2.660 -999.990 -999.990 0.853 ..P WKT 2010 07 02 10 19 55 31.3200 -97.3300 251.000 30.0 94.909 3.940 -999.990 -999.990 0.949 ..P WKT 2010 07 02 10 24 55 31.3200 -97.3300 251.000 122.0 101.131 4.070 -999.990 -999.990 1.011 ..P WKT 2010 07 02 10 29 55 31.3200 -97.3300 251.000 457.0 89.553 3.240 -999.990 -999.990 0.896 ..P WKT 2010 07 02 10 34 55 31.3200 -97.3300 251.000 30.0 96.335 3.800 -999.990 -999.990 0.963 ..P WKT 2010 07 02 10 39 55 31.3200 -97.3300 251.000 122.0 104.378 4.450 -999.990 -999.990 1.044 ..P WKT 2010 07 02 10 44 55 31.3200 -97.3300 251.000 457.0 96.164 3.790 -999.990 -999.990 0.962 ..P WKT 2010 07 02 10 54 55 31.3200 -97.3300 251.000 30.0 103.519 3.410 -999.990 -999.990 1.035 ..P WKT 2010 07 02 10 59 55 31.3200 -97.3300 251.000 122.0 97.649 4.110 -999.990 -999.990 0.976 ..P WKT 2010 07 02 11 04 55 31.3200 -97.3300 251.000 457.0 86.174 3.940 -999.990 -999.990 0.862 ..P WKT 2010 07 02 11 09 55 31.3200 -97.3300 251.000 30.0 88.430 4.370 -999.990 -999.990 0.884 ..P WKT 2010 07 02 11 14 55 31.3200 -97.3300 251.000 122.0 95.171 4.320 -999.990 -999.990 0.952 ..P WKT 2010 07 02 11 19 55 31.3200 -97.3300 251.000 457.0 82.015 3.140 -999.990 -999.990 0.820 ..P WKT 2010 07 02 11 29 55 31.3200 -97.3300 251.000 30.0 87.754 3.180 -999.990 -999.990 0.878 ..P WKT 2010 07 02 11 34 55 31.3200 -97.3300 251.000 122.0 90.115 3.350 -999.990 -999.990 0.901 ..P WKT 2010 07 02 11 39 55 31.3200 -97.3300 251.000 457.0 86.593 4.210 -999.990 -999.990 0.866 ..P WKT 2010 07 02 11 44 55 31.3200 -97.3300 251.000 30.0 89.794 4.420 -999.990 -999.990 0.898 ..P WKT 2010 07 02 11 49 55 31.3200 -97.3300 251.000 122.0 90.475 3.870 -999.990 -999.990 0.905 ..P WKT 2010 07 02 12 09 55 31.3200 -97.3300 251.000 457.0 87.548 2.920 -999.990 -999.990 0.875 ..P WKT 2010 07 02 12 10 25 31.3200 -97.3300 251.000 457.0 81.146 3.520 -999.990 -999.990 0.811 ..P WKT 2010 07 02 12 10 55 31.3200 -97.3300 251.000 457.0 82.308 2.210 -999.990 -999.990 0.823 ..P WKT 2010 07 02 12 11 25 31.3200 -97.3300 251.000 457.0 81.508 2.420 -999.990 -999.990 0.815 ..P WKT 2010 07 02 12 11 55 31.3200 -97.3300 251.000 457.0 89.392 2.520 -999.990 -999.990 0.894 ..P WKT 2010 07 02 12 12 25 31.3200 -97.3300 251.000 457.0 84.391 2.200 -999.990 -999.990 0.844 ..P WKT 2010 07 02 12 12 55 31.3200 -97.3300 251.000 457.0 84.711 1.910 -999.990 -999.990 0.847 ..P WKT 2010 07 02 12 13 25 31.3200 -97.3300 251.000 457.0 82.792 1.870 -999.990 -999.990 0.828 ..P WKT 2010 07 02 12 13 55 31.3200 -97.3300 251.000 457.0 78.351 2.440 -999.990 -999.990 0.784 ..P WKT 2010 07 02 12 14 25 31.3200 -97.3300 251.000 457.0 85.394 1.900 -999.990 -999.990 0.854 ..P WKT 2010 07 02 12 14 55 31.3200 -97.3300 251.000 457.0 84.034 2.060 -999.990 -999.990 0.840 ..P WKT 2010 07 02 12 19 55 31.3200 -97.3300 251.000 30.0 97.606 3.370 -999.990 -999.990 0.976 ..P WKT 2010 07 02 12 24 55 31.3200 -97.3300 251.000 122.0 99.693 3.180 -999.990 -999.990 0.997 ..P WKT 2010 07 02 12 29 55 31.3200 -97.3300 251.000 457.0 87.777 5.160 -999.990 -999.990 0.878 ..P WKT 2010 07 02 12 34 55 31.3200 -97.3300 251.000 30.0 100.506 3.660 -999.990 -999.990 1.005 ..P WKT 2010 07 02 12 39 55 31.3200 -97.3300 251.000 122.0 100.073 3.160 -999.990 -999.990 1.001 ..P WKT 2010 07 02 12 44 55 31.3200 -97.3300 251.000 457.0 91.519 3.120 -999.990 -999.990 0.915 ..P WKT 2010 07 02 12 54 55 31.3200 -97.3300 251.000 30.0 96.414 4.110 -999.990 -999.990 0.964 ..P WKT 2010 07 02 12 59 55 31.3200 -97.3300 251.000 122.0 93.201 2.840 -999.990 -999.990 0.932 ..P WKT 2010 07 02 13 04 55 31.3200 -97.3300 251.000 457.0 82.710 3.020 -999.990 -999.990 0.827 ..P WKT 2010 07 02 13 09 55 31.3200 -97.3300 251.000 30.0 93.634 3.260 -999.990 -999.990 0.936 ..P WKT 2010 07 02 13 14 55 31.3200 -97.3300 251.000 122.0 97.560 3.640 -999.990 -999.990 0.976 ..P WKT 2010 07 02 13 19 55 31.3200 -97.3300 251.000 457.0 78.115 2.140 -999.990 -999.990 0.781 ..P WKT 2010 07 02 13 29 55 31.3200 -97.3300 251.000 30.0 95.602 2.340 -999.990 -999.990 0.956 ..P WKT 2010 07 02 13 34 55 31.3200 -97.3300 251.000 122.0 94.609 3.810 -999.990 -999.990 0.946 ..P WKT 2010 07 02 13 39 55 31.3200 -97.3300 251.000 457.0 82.704 3.110 -999.990 -999.990 0.827 ..P WKT 2010 07 02 13 44 55 31.3200 -97.3300 251.000 30.0 93.884 3.100 -999.990 -999.990 0.939 ..P WKT 2010 07 02 13 49 55 31.3200 -97.3300 251.000 122.0 94.291 3.460 -999.990 -999.990 0.943 ..P WKT 2010 07 02 13 54 55 31.3200 -97.3300 251.000 457.0 80.009 3.290 -999.990 -999.990 0.800 ..P WKT 2010 07 02 14 04 55 31.3200 -97.3300 251.000 30.0 104.102 6.880 -999.990 -999.990 1.041 ..P WKT 2010 07 02 14 09 55 31.3200 -97.3300 251.000 122.0 96.736 5.050 -999.990 -999.990 0.967 ..P WKT 2010 07 02 14 14 55 31.3200 -97.3300 251.000 457.0 80.560 3.520 -999.990 -999.990 0.806 ..P WKT 2010 07 02 14 19 55 31.3200 -97.3300 251.000 30.0 96.550 3.860 -999.990 -999.990 0.966 ..P WKT 2010 07 02 14 24 55 31.3200 -97.3300 251.000 122.0 98.694 4.370 -999.990 -999.990 0.987 ..P WKT 2010 07 02 14 29 55 31.3200 -97.3300 251.000 457.0 80.423 3.510 -999.990 -999.990 0.804 ..P WKT 2010 07 02 14 39 55 31.3200 -97.3300 251.000 30.0 94.700 3.550 -999.990 -999.990 0.947 ..P WKT 2010 07 02 14 44 55 31.3200 -97.3300 251.000 122.0 95.785 3.190 -999.990 -999.990 0.958 ..P WKT 2010 07 02 14 49 55 31.3200 -97.3300 251.000 457.0 84.848 2.840 -999.990 -999.990 0.848 ..P WKT 2010 07 02 14 54 55 31.3200 -97.3300 251.000 30.0 89.568 3.270 -999.990 -999.990 0.896 ..P WKT 2010 07 02 14 59 55 31.3200 -97.3300 251.000 122.0 90.094 2.570 -999.990 -999.990 0.901 ..P WKT 2010 07 02 15 04 55 31.3200 -97.3300 251.000 457.0 84.750 2.910 -999.990 -999.990 0.848 ..P WKT 2010 07 02 15 14 55 31.3200 -97.3300 251.000 30.0 93.810 4.420 -999.990 -999.990 0.938 ..P WKT 2010 07 02 15 19 55 31.3200 -97.3300 251.000 122.0 100.385 2.420 -999.990 -999.990 1.004 ..P WKT 2010 07 02 15 24 55 31.3200 -97.3300 251.000 457.0 85.719 2.550 -999.990 -999.990 0.857 ..P WKT 2010 07 02 15 29 55 31.3200 -97.3300 251.000 30.0 98.721 2.650 -999.990 -999.990 0.987 ..P WKT 2010 07 02 15 34 55 31.3200 -97.3300 251.000 122.0 96.911 2.700 -999.990 -999.990 0.969 ..P WKT 2010 07 02 15 39 55 31.3200 -97.3300 251.000 457.0 90.072 2.740 -999.990 -999.990 0.901 ..P WKT 2010 07 02 15 49 55 31.3200 -97.3300 251.000 30.0 96.033 2.680 -999.990 -999.990 0.960 ..P WKT 2010 07 02 15 54 55 31.3200 -97.3300 251.000 122.0 102.407 2.560 -999.990 -999.990 1.024 ..P WKT 2010 07 02 15 59 55 31.3200 -97.3300 251.000 457.0 87.547 2.890 -999.990 -999.990 0.875 ..P WKT 2010 07 02 16 04 55 31.3200 -97.3300 251.000 30.0 91.684 3.250 -999.990 -999.990 0.917 ..P WKT 2010 07 02 16 09 55 31.3200 -97.3300 251.000 122.0 94.146 3.340 -999.990 -999.990 0.941 ..P WKT 2010 07 02 16 14 55 31.3200 -97.3300 251.000 457.0 89.344 2.660 -999.990 -999.990 0.893 ..P WKT 2010 07 02 16 24 55 31.3200 -97.3300 251.000 30.0 96.600 2.520 -999.990 -999.990 0.966 ..P WKT 2010 07 02 16 29 55 31.3200 -97.3300 251.000 122.0 99.161 2.980 -999.990 -999.990 0.992 ..P WKT 2010 07 02 16 34 55 31.3200 -97.3300 251.000 457.0 84.686 2.850 -999.990 -999.990 0.847 ..P WKT 2010 07 02 16 39 55 31.3200 -97.3300 251.000 30.0 96.740 3.900 -999.990 -999.990 0.967 ..P WKT 2010 07 02 16 44 55 31.3200 -97.3300 251.000 122.0 102.651 3.810 -999.990 -999.990 1.027 ..P WKT 2010 07 02 16 49 55 31.3200 -97.3300 251.000 457.0 94.460 3.680 -999.990 -999.990 0.945 ..P WKT 2010 07 02 17 04 55 31.3200 -97.3300 251.000 30.0 92.946 3.560 -999.990 -999.990 0.929 ..P WKT 2010 07 02 17 09 55 31.3200 -97.3300 251.000 122.0 92.723 3.610 -999.990 -999.990 0.927 ..P WKT 2010 07 02 17 14 55 31.3200 -97.3300 251.000 457.0 74.917 5.530 -999.990 -999.990 0.749 ..P WKT 2010 07 02 17 19 55 31.3200 -97.3300 251.000 30.0 90.884 4.900 -999.990 -999.990 0.909 ..P WKT 2010 07 02 17 24 55 31.3200 -97.3300 251.000 122.0 92.615 4.320 -999.990 -999.990 0.926 ..P WKT 2010 07 02 17 29 55 31.3200 -97.3300 251.000 457.0 78.021 3.200 -999.990 -999.990 0.780 ..P WKT 2010 07 02 17 39 55 31.3200 -97.3300 251.000 30.0 90.843 4.150 -999.990 -999.990 0.908 ..P WKT 2010 07 02 17 44 55 31.3200 -97.3300 251.000 122.0 93.700 4.630 -999.990 -999.990 0.937 ..P WKT 2010 07 02 17 49 55 31.3200 -97.3300 251.000 457.0 79.677 5.190 -999.990 -999.990 0.797 ..P WKT 2010 07 02 17 54 55 31.3200 -97.3300 251.000 30.0 96.623 5.840 -999.990 -999.990 0.966 ..P WKT 2010 07 02 17 59 55 31.3200 -97.3300 251.000 122.0 93.342 5.070 -999.990 -999.990 0.933 ..P WKT 2010 07 02 18 04 55 31.3200 -97.3300 251.000 457.0 94.385 3.100 -999.990 -999.990 0.944 ..P WKT 2010 07 02 18 14 55 31.3200 -97.3300 251.000 30.0 98.982 3.260 -999.990 -999.990 0.990 ..P WKT 2010 07 02 18 19 55 31.3200 -97.3300 251.000 122.0 99.188 4.420 -999.990 -999.990 0.992 ..P WKT 2010 07 02 18 24 55 31.3200 -97.3300 251.000 457.0 89.354 5.320 -999.990 -999.990 0.894 ..P WKT 2010 07 02 18 29 55 31.3200 -97.3300 251.000 30.0 93.603 4.520 -999.990 -999.990 0.936 ..P WKT 2010 07 02 18 34 55 31.3200 -97.3300 251.000 122.0 93.670 4.860 -999.990 -999.990 0.937 ..P WKT 2010 07 02 18 39 55 31.3200 -97.3300 251.000 457.0 86.905 3.740 -999.990 -999.990 0.869 ..P WKT 2010 07 02 18 49 55 31.3200 -97.3300 251.000 30.0 94.647 2.960 -999.990 -999.990 0.946 ..P WKT 2010 07 02 18 54 55 31.3200 -97.3300 251.000 122.0 94.793 2.490 -999.990 -999.990 0.948 ..P WKT 2010 07 02 18 59 55 31.3200 -97.3300 251.000 457.0 86.297 3.620 -999.990 -999.990 0.863 ..P WKT 2010 07 02 19 04 55 31.3200 -97.3300 251.000 30.0 92.298 3.150 -999.990 -999.990 0.923 ..P WKT 2010 07 02 19 09 55 31.3200 -97.3300 251.000 122.0 101.643 2.870 -999.990 -999.990 1.016 ..P WKT 2010 07 02 19 14 55 31.3200 -97.3300 251.000 457.0 87.295 3.680 -999.990 -999.990 0.873 ..P WKT 2010 07 02 19 24 55 31.3200 -97.3300 251.000 30.0 88.822 2.670 -999.990 -999.990 0.888 ..P WKT 2010 07 02 19 29 55 31.3200 -97.3300 251.000 122.0 90.761 2.930 -999.990 -999.990 0.908 ..P WKT 2010 07 02 19 34 55 31.3200 -97.3300 251.000 457.0 87.404 3.840 -999.990 -999.990 0.874 ..P WKT 2010 07 02 19 39 55 31.3200 -97.3300 251.000 30.0 92.128 5.580 -999.990 -999.990 0.921 ..P WKT 2010 07 02 19 44 55 31.3200 -97.3300 251.000 122.0 88.494 3.650 -999.990 -999.990 0.885 ..P WKT 2010 07 02 19 49 55 31.3200 -97.3300 251.000 457.0 82.629 3.110 -999.990 -999.990 0.826 ..P WKT 2010 07 02 19 59 55 31.3200 -97.3300 251.000 30.0 84.356 3.540 -999.990 -999.990 0.844 ..P WKT 2010 07 02 20 04 55 31.3200 -97.3300 251.000 122.0 87.488 3.910 -999.990 -999.990 0.875 ..P WKT 2010 07 02 20 09 55 31.3200 -97.3300 251.000 457.0 78.084 4.350 -999.990 -999.990 0.781 ..P WKT 2010 07 02 20 14 55 31.3200 -97.3300 251.000 30.0 84.280 4.630 -999.990 -999.990 0.843 ..P WKT 2010 07 02 20 19 55 31.3200 -97.3300 251.000 122.0 97.995 2.730 -999.990 -999.990 0.980 ..P WKT 2010 07 02 20 24 55 31.3200 -97.3300 251.000 457.0 86.086 3.690 -999.990 -999.990 0.861 ..P WKT 2010 07 02 20 34 55 31.3200 -97.3300 251.000 30.0 88.129 2.480 -999.990 -999.990 0.881 ..P WKT 2010 07 02 20 39 55 31.3200 -97.3300 251.000 122.0 93.865 4.380 -999.990 -999.990 0.939 ..P WKT 2010 07 02 20 44 55 31.3200 -97.3300 251.000 457.0 88.740 3.510 -999.990 -999.990 0.887 ..P WKT 2010 07 02 20 49 55 31.3200 -97.3300 251.000 30.0 88.628 2.520 -999.990 -999.990 0.886 ..P WKT 2010 07 02 20 54 55 31.3200 -97.3300 251.000 122.0 95.754 3.240 -999.990 -999.990 0.958 ..P WKT 2010 07 02 20 59 55 31.3200 -97.3300 251.000 457.0 95.920 3.140 -999.990 -999.990 0.959 ..P WKT 2010 07 02 21 09 55 31.3200 -97.3300 251.000 30.0 89.811 2.970 -999.990 -999.990 0.898 ..P WKT 2010 07 02 21 14 55 31.3200 -97.3300 251.000 122.0 92.720 3.240 -999.990 -999.990 0.927 ..P WKT 2010 07 02 21 19 55 31.3200 -97.3300 251.000 457.0 87.280 2.970 -999.990 -999.990 0.873 ..P WKT 2010 07 02 21 24 55 31.3200 -97.3300 251.000 30.0 86.989 3.270 -999.990 -999.990 0.870 ..P WKT 2010 07 02 21 29 55 31.3200 -97.3300 251.000 122.0 100.752 3.360 -999.990 -999.990 1.008 ..P WKT 2010 07 02 21 34 55 31.3200 -97.3300 251.000 457.0 86.825 3.990 -999.990 -999.990 0.868 ..P WKT 2010 07 02 21 44 55 31.3200 -97.3300 251.000 30.0 85.866 3.810 -999.990 -999.990 0.859 ..P WKT 2010 07 02 21 49 55 31.3200 -97.3300 251.000 122.0 89.093 3.590 -999.990 -999.990 0.891 ..P WKT 2010 07 02 21 54 55 31.3200 -97.3300 251.000 457.0 90.233 3.720 -999.990 -999.990 0.902 ..P WKT 2010 07 02 21 59 55 31.3200 -97.3300 251.000 30.0 102.083 3.480 -999.990 -999.990 1.021 ..P WKT 2010 07 02 22 04 55 31.3200 -97.3300 251.000 122.0 107.673 3.540 -999.990 -999.990 1.077 ..P WKT 2010 07 02 22 09 55 31.3200 -97.3300 251.000 457.0 79.049 3.240 -999.990 -999.990 0.790 ..P WKT 2010 07 02 22 19 55 31.3200 -97.3300 251.000 30.0 97.858 3.040 -999.990 -999.990 0.979 ..P WKT 2010 07 02 22 24 55 31.3200 -97.3300 251.000 122.0 101.897 4.050 -999.990 -999.990 1.019 ..P WKT 2010 07 02 22 29 55 31.3200 -97.3300 251.000 457.0 83.410 3.210 -999.990 -999.990 0.834 ..P WKT 2010 07 02 22 34 55 31.3200 -97.3300 251.000 30.0 80.220 3.080 -999.990 -999.990 0.802 ..P WKT 2010 07 02 22 39 55 31.3200 -97.3300 251.000 122.0 89.126 2.700 -999.990 -999.990 0.891 ..P WKT 2010 07 02 22 44 55 31.3200 -97.3300 251.000 457.0 79.679 2.780 -999.990 -999.990 0.797 ..P WKT 2010 07 02 22 54 55 31.3200 -97.3300 251.000 30.0 83.528 3.680 -999.990 -999.990 0.835 ..P WKT 2010 07 02 22 59 55 31.3200 -97.3300 251.000 122.0 85.144 2.740 -999.990 -999.990 0.851 ..P WKT 2010 07 02 23 04 55 31.3200 -97.3300 251.000 457.0 82.868 2.730 -999.990 -999.990 0.829 ..P WKT 2010 07 02 23 09 55 31.3200 -97.3300 251.000 30.0 85.595 3.110 -999.990 -999.990 0.856 ..P WKT 2010 07 02 23 14 55 31.3200 -97.3300 251.000 122.0 95.827 3.050 -999.990 -999.990 0.958 ..P WKT 2010 07 02 23 19 55 31.3200 -97.3300 251.000 457.0 81.044 2.750 -999.990 -999.990 0.810 ..P WKT 2010 07 02 23 29 55 31.3200 -97.3300 251.000 30.0 93.660 3.400 -999.990 -999.990 0.937 ..P WKT 2010 07 02 23 34 55 31.3200 -97.3300 251.000 122.0 93.265 3.490 -999.990 -999.990 0.933 ..P WKT 2010 07 02 23 39 55 31.3200 -97.3300 251.000 457.0 91.480 3.020 -999.990 -999.990 0.915 ..P WKT 2010 07 02 23 44 55 31.3200 -97.3300 251.000 30.0 88.307 3.310 -999.990 -999.990 0.883 ..P WKT 2010 07 02 23 49 55 31.3200 -97.3300 251.000 122.0 86.800 3.080 -999.990 -999.990 0.868 ..P WKT 2010 07 03 00 09 55 31.3200 -97.3300 251.000 457.0 83.734 4.080 -999.990 -999.990 0.837 ..P WKT 2010 07 03 00 10 25 31.3200 -97.3300 251.000 457.0 87.070 3.540 -999.990 -999.990 0.871 ..P WKT 2010 07 03 00 10 55 31.3200 -97.3300 251.000 457.0 81.795 3.210 -999.990 -999.990 0.818 ..P WKT 2010 07 03 00 11 25 31.3200 -97.3300 251.000 457.0 83.742 3.670 -999.990 -999.990 0.837 ..P WKT 2010 07 03 00 11 55 31.3200 -97.3300 251.000 457.0 85.133 3.370 -999.990 -999.990 0.851 ..P WKT 2010 07 03 00 12 25 31.3200 -97.3300 251.000 457.0 90.136 4.180 -999.990 -999.990 0.901 ..P WKT 2010 07 03 00 12 55 31.3200 -97.3300 251.000 457.0 91.249 3.300 -999.990 -999.990 0.912 ..P WKT 2010 07 03 00 13 25 31.3200 -97.3300 251.000 457.0 91.252 3.370 -999.990 -999.990 0.913 ..P WKT 2010 07 03 00 13 55 31.3200 -97.3300 251.000 457.0 91.810 4.020 -999.990 -999.990 0.918 ..P WKT 2010 07 03 00 14 25 31.3200 -97.3300 251.000 457.0 93.757 3.590 -999.990 -999.990 0.938 ..P WKT 2010 07 03 00 14 55 31.3200 -97.3300 251.000 457.0 90.982 3.120 -999.990 -999.990 0.910 ..P WKT 2010 07 03 00 19 55 31.3200 -97.3300 251.000 30.0 83.227 3.220 -999.990 -999.990 0.832 ..P WKT 2010 07 03 00 24 55 31.3200 -97.3300 251.000 122.0 90.751 3.860 -999.990 -999.990 0.908 ..P WKT 2010 07 03 00 29 55 31.3200 -97.3300 251.000 457.0 91.887 4.250 -999.990 -999.990 0.919 ..P WKT 2010 07 03 00 34 55 31.3200 -97.3300 251.000 30.0 86.355 4.420 -999.990 -999.990 0.864 ..P WKT 2010 07 03 00 39 55 31.3200 -97.3300 251.000 122.0 92.907 3.650 -999.990 -999.990 0.929 ..P WKT 2010 07 03 00 44 55 31.3200 -97.3300 251.000 457.0 82.236 4.970 -999.990 -999.990 0.822 ..P WKT 2010 07 03 00 54 55 31.3200 -97.3300 251.000 30.0 87.388 3.790 -999.990 -999.990 0.874 ..P WKT 2010 07 03 00 59 55 31.3200 -97.3300 251.000 122.0 85.849 4.130 -999.990 -999.990 0.858 ..P WKT 2010 07 03 01 04 55 31.3200 -97.3300 251.000 457.0 88.754 3.430 -999.990 -999.990 0.888 ..P WKT 2010 07 03 01 09 55 31.3200 -97.3300 251.000 30.0 87.216 4.360 -999.990 -999.990 0.872 ..P WKT 2010 07 03 01 14 55 31.3200 -97.3300 251.000 122.0 84.982 3.770 -999.990 -999.990 0.850 ..P WKT 2010 07 03 01 19 55 31.3200 -97.3300 251.000 457.0 90.527 3.920 -999.990 -999.990 0.905 ..P WKT 2010 07 03 01 29 55 31.3200 -97.3300 251.000 30.0 95.802 3.200 -999.990 -999.990 0.958 ..P WKT 2010 07 03 01 34 55 31.3200 -97.3300 251.000 122.0 97.755 3.430 -999.990 -999.990 0.978 ..P WKT 2010 07 03 01 39 55 31.3200 -97.3300 251.000 457.0 96.514 4.130 -999.990 -999.990 0.965 ..P WKT 2010 07 03 01 44 55 31.3200 -97.3300 251.000 30.0 90.828 3.370 -999.990 -999.990 0.908 ..P WKT 2010 07 03 01 49 55 31.3200 -97.3300 251.000 122.0 86.669 3.980 -999.990 -999.990 0.867 ..P WKT 2010 07 03 01 54 55 31.3200 -97.3300 251.000 457.0 90.705 4.530 -999.990 -999.990 0.907 ..P WKT 2010 07 03 02 04 55 31.3200 -97.3300 251.000 30.0 86.873 3.820 -999.990 -999.990 0.869 ..P WKT 2010 07 03 02 09 55 31.3200 -97.3300 251.000 122.0 87.477 4.010 -999.990 -999.990 0.875 ..P WKT 2010 07 03 02 14 55 31.3200 -97.3300 251.000 457.0 79.746 3.850 -999.990 -999.990 0.797 ..P WKT 2010 07 03 02 19 55 31.3200 -97.3300 251.000 30.0 87.435 4.070 -999.990 -999.990 0.874 ..P WKT 2010 07 03 02 24 55 31.3200 -97.3300 251.000 122.0 87.900 3.960 -999.990 -999.990 0.879 ..P WKT 2010 07 03 02 29 55 31.3200 -97.3300 251.000 457.0 92.115 4.580 -999.990 -999.990 0.921 ..P WKT 2010 07 03 02 39 55 31.3200 -97.3300 251.000 30.0 91.040 3.720 -999.990 -999.990 0.910 ..P WKT 2010 07 03 02 44 55 31.3200 -97.3300 251.000 122.0 96.447 3.580 -999.990 -999.990 0.964 ..P WKT 2010 07 03 02 49 55 31.3200 -97.3300 251.000 457.0 90.463 4.460 -999.990 -999.990 0.905 ..P WKT 2010 07 03 02 54 55 31.3200 -97.3300 251.000 30.0 90.868 4.010 -999.990 -999.990 0.909 ..P WKT 2010 07 03 02 59 55 31.3200 -97.3300 251.000 122.0 92.107 4.120 -999.990 -999.990 0.921 ..P WKT 2010 07 03 03 04 55 31.3200 -97.3300 251.000 457.0 90.012 3.990 -999.990 -999.990 0.900 ..P WKT 2010 07 03 03 14 55 31.3200 -97.3300 251.000 30.0 92.847 3.900 -999.990 -999.990 0.928 ..P WKT 2010 07 03 03 19 55 31.3200 -97.3300 251.000 122.0 99.167 3.980 -999.990 -999.990 0.992 ..P WKT 2010 07 03 03 24 55 31.3200 -97.3300 251.000 457.0 84.926 3.560 -999.990 -999.990 0.849 ..P WKT 2010 07 03 03 29 55 31.3200 -97.3300 251.000 30.0 93.190 3.390 -999.990 -999.990 0.932 ..P WKT 2010 07 03 03 34 55 31.3200 -97.3300 251.000 122.0 95.620 2.750 -999.990 -999.990 0.956 ..P WKT 2010 07 03 03 39 55 31.3200 -97.3300 251.000 457.0 84.436 2.990 -999.990 -999.990 0.844 ..P WKT 2010 07 03 03 49 55 31.3200 -97.3300 251.000 30.0 87.152 2.500 -999.990 -999.990 0.872 ..P WKT 2010 07 03 03 54 55 31.3200 -97.3300 251.000 122.0 95.496 3.470 -999.990 -999.990 0.955 ..P WKT 2010 07 03 03 59 55 31.3200 -97.3300 251.000 457.0 80.501 2.700 -999.990 -999.990 0.805 ..P WKT 2010 07 03 04 04 55 31.3200 -97.3300 251.000 30.0 93.013 2.600 -999.990 -999.990 0.930 ..P WKT 2010 07 03 04 09 55 31.3200 -97.3300 251.000 122.0 89.687 2.570 -999.990 -999.990 0.897 ..P WKT 2010 07 03 04 14 55 31.3200 -97.3300 251.000 457.0 89.695 3.180 -999.990 -999.990 0.897 ..P WKT 2010 07 03 04 24 55 31.3200 -97.3300 251.000 30.0 97.016 4.080 -999.990 -999.990 0.970 ..P WKT 2010 07 03 04 29 55 31.3200 -97.3300 251.000 122.0 103.494 3.760 -999.990 -999.990 1.035 ..P WKT 2010 07 03 04 34 55 31.3200 -97.3300 251.000 457.0 83.161 3.170 -999.990 -999.990 0.832 ..P WKT 2010 07 03 04 39 55 31.3200 -97.3300 251.000 30.0 98.530 4.510 -999.990 -999.990 0.985 ..P WKT 2010 07 03 04 44 55 31.3200 -97.3300 251.000 122.0 99.174 3.910 -999.990 -999.990 0.992 ..P WKT 2010 07 03 04 49 55 31.3200 -97.3300 251.000 457.0 83.008 2.580 -999.990 -999.990 0.830 ..P WKT 2010 07 03 05 04 55 31.3200 -97.3300 251.000 30.0 96.485 3.390 -999.990 -999.990 0.965 ..P WKT 2010 07 03 05 09 55 31.3200 -97.3300 251.000 122.0 101.790 4.060 -999.990 -999.990 1.018 ..P WKT 2010 07 03 05 14 55 31.3200 -97.3300 251.000 457.0 84.589 5.720 -999.990 -999.990 0.846 ..P WKT 2010 07 03 05 19 55 31.3200 -97.3300 251.000 30.0 94.757 6.650 -999.990 -999.990 0.948 ..P WKT 2010 07 03 05 24 55 31.3200 -97.3300 251.000 122.0 96.866 4.210 -999.990 -999.990 0.969 ..P WKT 2010 07 03 05 29 55 31.3200 -97.3300 251.000 457.0 75.359 4.020 -999.990 -999.990 0.754 ..P WKT 2010 07 03 05 39 55 31.3200 -97.3300 251.000 30.0 93.732 4.170 -999.990 -999.990 0.937 ..P WKT 2010 07 03 05 44 55 31.3200 -97.3300 251.000 122.0 99.437 4.790 -999.990 -999.990 0.994 ..P WKT 2010 07 03 05 49 55 31.3200 -97.3300 251.000 457.0 80.829 5.320 -999.990 -999.990 0.808 ..P WKT 2010 07 03 05 54 55 31.3200 -97.3300 251.000 30.0 94.591 4.580 -999.990 -999.990 0.946 ..P WKT 2010 07 03 05 59 55 31.3200 -97.3300 251.000 122.0 97.656 3.940 -999.990 -999.990 0.977 ..P WKT 2010 07 03 06 04 55 31.3200 -97.3300 251.000 457.0 88.079 3.310 -999.990 -999.990 0.881 ..P WKT 2010 07 03 06 14 55 31.3200 -97.3300 251.000 30.0 97.782 3.170 -999.990 -999.990 0.978 ..P WKT 2010 07 03 06 19 55 31.3200 -97.3300 251.000 122.0 100.390 3.710 -999.990 -999.990 1.004 ..P WKT 2010 07 03 06 24 55 31.3200 -97.3300 251.000 457.0 86.744 4.200 -999.990 -999.990 0.867 ..P WKT 2010 07 03 06 29 55 31.3200 -97.3300 251.000 30.0 94.632 3.550 -999.990 -999.990 0.946 ..P WKT 2010 07 03 06 34 55 31.3200 -97.3300 251.000 122.0 98.074 3.200 -999.990 -999.990 0.981 ..P WKT 2010 07 03 06 39 55 31.3200 -97.3300 251.000 457.0 84.567 2.190 -999.990 -999.990 0.846 ..P WKT 2010 07 03 06 49 55 31.3200 -97.3300 251.000 30.0 97.981 4.220 -999.990 -999.990 0.980 ..P WKT 2010 07 03 06 54 55 31.3200 -97.3300 251.000 122.0 98.505 2.710 -999.990 -999.990 0.985 ..P WKT 2010 07 03 06 59 55 31.3200 -97.3300 251.000 457.0 87.637 4.290 -999.990 -999.990 0.876 ..P WKT 2010 07 03 07 04 55 31.3200 -97.3300 251.000 30.0 92.330 2.680 -999.990 -999.990 0.923 ..P WKT 2010 07 03 07 09 55 31.3200 -97.3300 251.000 122.0 98.689 2.710 -999.990 -999.990 0.987 ..P WKT 2010 07 03 07 14 55 31.3200 -97.3300 251.000 457.0 88.656 3.130 -999.990 -999.990 0.887 ..P WKT 2010 07 03 07 24 55 31.3200 -97.3300 251.000 30.0 102.963 2.820 -999.990 -999.990 1.030 ..P WKT 2010 07 03 07 29 55 31.3200 -97.3300 251.000 122.0 98.685 3.070 -999.990 -999.990 0.987 ..P WKT 2010 07 03 07 34 55 31.3200 -97.3300 251.000 457.0 93.017 3.210 -999.990 -999.990 0.930 ..P WKT 2010 07 03 07 39 55 31.3200 -97.3300 251.000 30.0 101.242 3.110 -999.990 -999.990 1.012 ..P WKT 2010 07 03 07 44 55 31.3200 -97.3300 251.000 122.0 101.688 3.140 -999.990 -999.990 1.017 ..P WKT 2010 07 03 07 49 55 31.3200 -97.3300 251.000 457.0 89.907 3.610 -999.990 -999.990 0.899 ..P WKT 2010 07 03 07 59 55 31.3200 -97.3300 251.000 30.0 100.762 3.410 -999.990 -999.990 1.008 ..P WKT 2010 07 03 08 04 55 31.3200 -97.3300 251.000 122.0 100.055 4.520 -999.990 -999.990 1.001 ..P WKT 2010 07 03 08 09 55 31.3200 -97.3300 251.000 457.0 95.181 3.440 -999.990 -999.990 0.952 ..P WKT 2010 07 03 08 14 55 31.3200 -97.3300 251.000 30.0 99.755 3.900 -999.990 -999.990 0.998 ..P WKT 2010 07 03 08 19 55 31.3200 -97.3300 251.000 122.0 97.382 5.140 -999.990 -999.990 0.974 ..P WKT 2010 07 03 08 24 55 31.3200 -97.3300 251.000 457.0 95.842 3.860 -999.990 -999.990 0.958 ..P WKT 2010 07 03 08 34 55 31.3200 -97.3300 251.000 30.0 96.157 5.220 -999.990 -999.990 0.962 ..P WKT 2010 07 03 08 39 55 31.3200 -97.3300 251.000 122.0 107.320 4.000 -999.990 -999.990 1.073 ..P WKT 2010 07 03 08 44 55 31.3200 -97.3300 251.000 457.0 85.000 4.300 -999.990 -999.990 0.850 ..P WKT 2010 07 03 08 49 55 31.3200 -97.3300 251.000 30.0 98.108 5.550 -999.990 -999.990 0.981 ..P WKT 2010 07 03 08 54 55 31.3200 -97.3300 251.000 122.0 101.352 4.490 -999.990 -999.990 1.014 ..P WKT 2010 07 03 08 59 55 31.3200 -97.3300 251.000 457.0 86.396 5.180 -999.990 -999.990 0.864 ..P WKT 2010 07 03 09 09 55 31.3200 -97.3300 251.000 30.0 103.482 4.700 -999.990 -999.990 1.035 ..P WKT 2010 07 03 09 14 55 31.3200 -97.3300 251.000 122.0 104.265 3.970 -999.990 -999.990 1.043 ..P WKT 2010 07 03 09 19 55 31.3200 -97.3300 251.000 457.0 93.655 4.090 -999.990 -999.990 0.937 ..P WKT 2010 07 03 09 24 55 31.3200 -97.3300 251.000 30.0 104.858 4.760 -999.990 -999.990 1.049 ..P WKT 2010 07 03 09 29 55 31.3200 -97.3300 251.000 122.0 107.030 2.750 -999.990 -999.990 1.070 ..P WKT 2010 07 03 09 34 55 31.3200 -97.3300 251.000 457.0 83.776 4.140 -999.990 -999.990 0.838 ..P WKT 2010 07 03 09 44 55 31.3200 -97.3300 251.000 30.0 107.414 2.170 -999.990 -999.990 1.074 ..P WKT 2010 07 03 09 49 55 31.3200 -97.3300 251.000 122.0 109.983 4.270 -999.990 -999.990 1.100 ..P WKT 2010 07 03 09 54 55 31.3200 -97.3300 251.000 457.0 89.765 2.660 -999.990 -999.990 0.898 ..P WKT 2010 07 03 09 59 55 31.3200 -97.3300 251.000 30.0 102.616 4.650 -999.990 -999.990 1.026 ..P WKT 2010 07 03 10 04 55 31.3200 -97.3300 251.000 122.0 109.909 3.970 -999.990 -999.990 1.099 ..P WKT 2010 07 03 10 09 55 31.3200 -97.3300 251.000 457.0 90.664 2.730 -999.990 -999.990 0.907 ..P WKT 2010 07 03 10 19 55 31.3200 -97.3300 251.000 30.0 100.805 2.720 -999.990 -999.990 1.008 ..P WKT 2010 07 03 10 24 55 31.3200 -97.3300 251.000 122.0 108.376 3.930 -999.990 -999.990 1.084 ..P WKT 2010 07 03 10 29 55 31.3200 -97.3300 251.000 457.0 87.880 3.070 -999.990 -999.990 0.879 ..P WKT 2010 07 03 10 34 55 31.3200 -97.3300 251.000 30.0 101.843 3.890 -999.990 -999.990 1.018 ..P WKT 2010 07 03 10 39 55 31.3200 -97.3300 251.000 122.0 108.858 2.920 -999.990 -999.990 1.089 ..P WKT 2010 07 03 10 44 55 31.3200 -97.3300 251.000 457.0 90.863 2.430 -999.990 -999.990 0.909 ..P WKT 2010 07 03 10 54 55 31.3200 -97.3300 251.000 30.0 104.080 2.770 -999.990 -999.990 1.041 ..P WKT 2010 07 03 10 59 55 31.3200 -97.3300 251.000 122.0 107.225 2.120 -999.990 -999.990 1.072 ..P WKT 2010 07 03 11 04 55 31.3200 -97.3300 251.000 457.0 88.694 2.050 -999.990 -999.990 0.887 ..P WKT 2010 07 03 11 09 55 31.3200 -97.3300 251.000 30.0 101.288 3.090 -999.990 -999.990 1.013 ..P WKT 2010 07 03 11 14 55 31.3200 -97.3300 251.000 122.0 101.932 2.790 -999.990 -999.990 1.019 ..P WKT 2010 07 03 11 19 55 31.3200 -97.3300 251.000 457.0 91.460 2.410 -999.990 -999.990 0.915 ..P WKT 2010 07 03 11 29 55 31.3200 -97.3300 251.000 30.0 111.983 2.780 -999.990 -999.990 1.120 ..P WKT 2010 07 03 11 34 55 31.3200 -97.3300 251.000 122.0 107.406 2.220 -999.990 -999.990 1.074 ..P WKT 2010 07 03 11 39 55 31.3200 -97.3300 251.000 457.0 95.604 3.120 -999.990 -999.990 0.956 ..P WKT 2010 07 03 11 44 55 31.3200 -97.3300 251.000 30.0 109.091 2.170 -999.990 -999.990 1.091 ..P WKT 2010 07 03 11 49 55 31.3200 -97.3300 251.000 122.0 111.184 3.690 -999.990 -999.990 1.112 ..P WKT 2010 07 03 12 09 55 31.3200 -97.3300 251.000 457.0 99.196 3.400 -999.990 -999.990 0.992 ..P WKT 2010 07 03 12 10 25 31.3200 -97.3300 251.000 457.0 96.402 2.650 -999.990 -999.990 0.964 ..P WKT 2010 07 03 12 10 55 31.3200 -97.3300 251.000 457.0 100.273 2.990 -999.990 -999.990 1.003 ..P WKT 2010 07 03 12 11 25 31.3200 -97.3300 251.000 457.0 101.645 2.720 -999.990 -999.990 1.016 ..P WKT 2010 07 03 12 11 55 31.3200 -97.3300 251.000 457.0 98.295 2.710 -999.990 -999.990 0.983 ..P WKT 2010 07 03 12 12 25 31.3200 -97.3300 251.000 457.0 100.222 2.570 -999.990 -999.990 1.002 ..P WKT 2010 07 03 12 12 55 31.3200 -97.3300 251.000 457.0 94.651 3.910 -999.990 -999.990 0.947 ..P WKT 2010 07 03 12 13 25 31.3200 -97.3300 251.000 457.0 95.467 2.040 -999.990 -999.990 0.955 ..P WKT 2010 07 03 12 13 55 31.3200 -97.3300 251.000 457.0 87.118 4.540 -999.990 -999.990 0.871 ..P WKT 2010 07 03 12 14 25 31.3200 -97.3300 251.000 457.0 85.713 5.490 -999.990 -999.990 0.857 ..P WKT 2010 07 03 12 14 55 31.3200 -97.3300 251.000 457.0 97.638 2.630 -999.990 -999.990 0.976 ..P WKT 2010 07 03 12 19 55 31.3200 -97.3300 251.000 30.0 116.074 3.500 -999.990 -999.990 1.161 ..P WKT 2010 07 03 12 24 55 31.3200 -97.3300 251.000 122.0 117.845 2.260 -999.990 -999.990 1.178 ..P WKT 2010 07 03 12 29 55 31.3200 -97.3300 251.000 457.0 87.279 2.610 -999.990 -999.990 0.873 ..P WKT 2010 07 03 12 34 55 31.3200 -97.3300 251.000 30.0 115.141 2.640 -999.990 -999.990 1.151 ..P WKT 2010 07 03 12 39 55 31.3200 -97.3300 251.000 122.0 117.049 2.490 -999.990 -999.990 1.170 ..P WKT 2010 07 03 12 44 55 31.3200 -97.3300 251.000 457.0 87.474 2.290 -999.990 -999.990 0.875 ..P WKT 2010 07 03 12 54 55 31.3200 -97.3300 251.000 30.0 106.843 2.140 -999.990 -999.990 1.068 ..P WKT 2010 07 03 12 59 55 31.3200 -97.3300 251.000 122.0 107.243 3.320 -999.990 -999.990 1.072 ..P WKT 2010 07 03 13 04 55 31.3200 -97.3300 251.000 457.0 82.421 2.290 -999.990 -999.990 0.824 ..P WKT 2010 07 03 13 09 55 31.3200 -97.3300 251.000 30.0 113.721 3.300 -999.990 -999.990 1.137 ..P WKT 2010 07 03 13 14 55 31.3200 -97.3300 251.000 122.0 113.565 3.130 -999.990 -999.990 1.136 ..P WKT 2010 07 03 13 19 55 31.3200 -97.3300 251.000 457.0 94.297 3.240 -999.990 -999.990 0.943 ..P WKT 2010 07 03 13 29 55 31.3200 -97.3300 251.000 30.0 117.052 3.200 -999.990 -999.990 1.171 ..P WKT 2010 07 03 13 34 55 31.3200 -97.3300 251.000 122.0 114.345 3.920 -999.990 -999.990 1.143 ..P WKT 2010 07 03 13 39 55 31.3200 -97.3300 251.000 457.0 79.951 4.400 -999.990 -999.990 0.800 ..P WKT 2010 07 03 13 44 55 31.3200 -97.3300 251.000 30.0 120.001 3.210 -999.990 -999.990 1.200 ..P WKT 2010 07 03 13 49 55 31.3200 -97.3300 251.000 122.0 115.774 3.170 -999.990 -999.990 1.158 ..P WKT 2010 07 03 13 54 55 31.3200 -97.3300 251.000 457.0 91.358 4.140 -999.990 -999.990 0.914 ..P WKT 2010 07 03 14 04 55 31.3200 -97.3300 251.000 30.0 113.725 4.350 -999.990 -999.990 1.137 ..P WKT 2010 07 03 14 09 55 31.3200 -97.3300 251.000 122.0 111.556 2.620 -999.990 -999.990 1.116 ..P WKT 2010 07 03 14 14 55 31.3200 -97.3300 251.000 457.0 85.898 4.260 -999.990 -999.990 0.859 ..P WKT 2010 07 03 14 19 55 31.3200 -97.3300 251.000 30.0 102.522 4.960 -999.990 -999.990 1.025 ..P WKT 2010 07 03 14 24 55 31.3200 -97.3300 251.000 122.0 106.847 4.160 -999.990 -999.990 1.068 ..P WKT 2010 07 03 14 29 55 31.3200 -97.3300 251.000 457.0 76.373 3.520 -999.990 -999.990 0.764 ..P WKT 2010 07 03 14 39 55 31.3200 -97.3300 251.000 30.0 101.159 3.810 -999.990 -999.990 1.012 ..P WKT 2010 07 03 14 44 55 31.3200 -97.3300 251.000 122.0 102.288 4.570 -999.990 -999.990 1.023 ..P WKT 2010 07 03 14 49 55 31.3200 -97.3300 251.000 457.0 87.411 5.640 -999.990 -999.990 0.874 ..P WKT 2010 07 03 14 54 55 31.3200 -97.3300 251.000 30.0 98.473 3.670 -999.990 -999.990 0.985 ..P WKT 2010 07 03 14 59 55 31.3200 -97.3300 251.000 122.0 102.636 2.360 -999.990 -999.990 1.026 ..P WKT 2010 07 03 15 04 55 31.3200 -97.3300 251.000 457.0 86.390 3.470 -999.990 -999.990 0.864 ..P WKT 2010 07 03 15 14 55 31.3200 -97.3300 251.000 30.0 121.335 3.750 -999.990 -999.990 1.213 ..P WKT 2010 07 03 15 19 55 31.3200 -97.3300 251.000 122.0 120.961 3.180 -999.990 -999.990 1.210 ..P WKT 2010 07 03 15 24 55 31.3200 -97.3300 251.000 457.0 88.075 2.070 -999.990 -999.990 0.881 ..P WKT 2010 07 03 15 29 55 31.3200 -97.3300 251.000 30.0 104.513 2.010 -999.990 -999.990 1.045 ..P WKT 2010 07 03 15 34 55 31.3200 -97.3300 251.000 122.0 110.753 2.070 -999.990 -999.990 1.108 ..P WKT 2010 07 03 15 39 55 31.3200 -97.3300 251.000 457.0 96.063 2.430 -999.990 -999.990 0.961 ..P WKT 2010 07 03 15 49 55 31.3200 -97.3300 251.000 30.0 106.259 3.790 -999.990 -999.990 1.063 ..P WKT 2010 07 03 15 54 55 31.3200 -97.3300 251.000 122.0 105.810 2.730 -999.990 -999.990 1.058 ..P WKT 2010 07 03 15 59 55 31.3200 -97.3300 251.000 457.0 91.880 2.420 -999.990 -999.990 0.919 ..P WKT 2010 07 03 16 04 55 31.3200 -97.3300 251.000 30.0 109.040 3.660 -999.990 -999.990 1.090 ..P WKT 2010 07 03 16 09 55 31.3200 -97.3300 251.000 122.0 116.292 2.560 -999.990 -999.990 1.163 ..P WKT 2010 07 03 16 14 55 31.3200 -97.3300 251.000 457.0 91.920 2.650 -999.990 -999.990 0.919 ..P WKT 2010 07 03 16 24 55 31.3200 -97.3300 251.000 30.0 97.822 2.580 -999.990 -999.990 0.978 ..P WKT 2010 07 03 16 29 55 31.3200 -97.3300 251.000 122.0 97.298 3.040 -999.990 -999.990 0.973 ..P WKT 2010 07 03 16 34 55 31.3200 -97.3300 251.000 457.0 86.197 3.670 -999.990 -999.990 0.862 ..P WKT 2010 07 03 16 39 55 31.3200 -97.3300 251.000 30.0 107.374 3.080 -999.990 -999.990 1.074 ..P WKT 2010 07 03 16 44 55 31.3200 -97.3300 251.000 122.0 105.475 3.160 -999.990 -999.990 1.055 ..P WKT 2010 07 03 16 49 55 31.3200 -97.3300 251.000 457.0 89.574 3.500 -999.990 -999.990 0.896 ..P WKT 2010 07 03 17 04 55 31.3200 -97.3300 251.000 30.0 98.905 6.350 -999.990 -999.990 0.989 ..P WKT 2010 07 03 17 09 55 31.3200 -97.3300 251.000 122.0 101.359 3.320 -999.990 -999.990 1.014 ..P WKT 2010 07 03 17 14 55 31.3200 -97.3300 251.000 457.0 94.076 2.740 -999.990 -999.990 0.941 ..P WKT 2010 07 03 17 19 55 31.3200 -97.3300 251.000 30.0 98.724 2.550 -999.990 -999.990 0.987 ..P WKT 2010 07 03 17 24 55 31.3200 -97.3300 251.000 122.0 102.959 3.050 -999.990 -999.990 1.030 ..P WKT 2010 07 03 17 29 55 31.3200 -97.3300 251.000 457.0 90.473 2.700 -999.990 -999.990 0.905 ..P WKT 2010 07 03 17 39 55 31.3200 -97.3300 251.000 30.0 97.844 2.030 -999.990 -999.990 0.978 ..P WKT 2010 07 03 17 44 55 31.3200 -97.3300 251.000 122.0 99.064 3.480 -999.990 -999.990 0.991 ..P WKT 2010 07 03 17 49 55 31.3200 -97.3300 251.000 457.0 90.970 2.610 -999.990 -999.990 0.910 ..P WKT 2010 07 03 17 54 55 31.3200 -97.3300 251.000 30.0 103.416 2.110 -999.990 -999.990 1.034 ..P WKT 2010 07 03 17 59 55 31.3200 -97.3300 251.000 122.0 93.271 4.620 -999.990 -999.990 0.933 ..P WKT 2010 07 03 18 04 55 31.3200 -97.3300 251.000 457.0 88.742 2.370 -999.990 -999.990 0.887 ..P WKT 2010 07 03 18 14 55 31.3200 -97.3300 251.000 30.0 97.648 2.830 -999.990 -999.990 0.976 ..P WKT 2010 07 03 18 19 55 31.3200 -97.3300 251.000 122.0 94.117 2.260 -999.990 -999.990 0.941 ..P WKT 2010 07 03 18 24 55 31.3200 -97.3300 251.000 457.0 86.075 2.430 -999.990 -999.990 0.861 ..P WKT 2010 07 03 18 29 55 31.3200 -97.3300 251.000 30.0 87.333 3.210 -999.990 -999.990 0.873 ..P WKT 2010 07 03 18 34 55 31.3200 -97.3300 251.000 122.0 83.396 3.290 -999.990 -999.990 0.834 ..P WKT 2010 07 03 18 39 55 31.3200 -97.3300 251.000 457.0 74.541 2.390 -999.990 -999.990 0.745 ..P WKT 2010 07 03 18 49 55 31.3200 -97.3300 251.000 30.0 81.177 1.970 -999.990 -999.990 0.812 ..P WKT 2010 07 03 18 54 55 31.3200 -97.3300 251.000 122.0 81.907 3.140 -999.990 -999.990 0.819 ..P WKT 2010 07 03 18 59 55 31.3200 -97.3300 251.000 457.0 77.449 4.460 -999.990 -999.990 0.774 ..P WKT 2010 07 03 19 04 55 31.3200 -97.3300 251.000 30.0 81.456 6.070 -999.990 -999.990 0.815 ..P WKT 2010 07 03 19 09 55 31.3200 -97.3300 251.000 122.0 86.009 4.780 -999.990 -999.990 0.860 ..P WKT 2010 07 03 19 14 55 31.3200 -97.3300 251.000 457.0 91.923 3.070 -999.990 -999.990 0.919 ..P WKT 2010 07 03 19 24 55 31.3200 -97.3300 251.000 30.0 90.066 3.060 -999.990 -999.990 0.901 ..P WKT 2010 07 03 19 29 55 31.3200 -97.3300 251.000 122.0 83.390 4.760 -999.990 -999.990 0.834 ..P WKT 2010 07 03 19 34 55 31.3200 -97.3300 251.000 457.0 81.081 5.840 -999.990 -999.990 0.811 ..P WKT 2010 07 03 19 39 55 31.3200 -97.3300 251.000 30.0 89.950 5.730 -999.990 -999.990 0.900 ..P WKT 2010 07 03 19 44 55 31.3200 -97.3300 251.000 122.0 89.820 5.180 -999.990 -999.990 0.898 ..P WKT 2010 07 03 19 49 55 31.3200 -97.3300 251.000 457.0 82.060 3.250 -999.990 -999.990 0.821 ..P WKT 2010 07 03 19 59 55 31.3200 -97.3300 251.000 30.0 88.752 3.120 -999.990 -999.990 0.888 ..P WKT 2010 07 03 20 04 55 31.3200 -97.3300 251.000 122.0 91.755 4.860 -999.990 -999.990 0.918 ..P WKT 2010 07 03 20 09 55 31.3200 -97.3300 251.000 457.0 87.132 6.730 -999.990 -999.990 0.871 ..P WKT 2010 07 03 20 14 55 31.3200 -97.3300 251.000 30.0 88.774 4.990 -999.990 -999.990 0.888 ..P WKT 2010 07 03 20 19 55 31.3200 -97.3300 251.000 122.0 96.674 4.540 -999.990 -999.990 0.967 ..P WKT 2010 07 03 20 24 55 31.3200 -97.3300 251.000 457.0 93.414 2.730 -999.990 -999.990 0.934 ..P WKT 2010 07 03 20 34 55 31.3200 -97.3300 251.000 30.0 87.131 3.370 -999.990 -999.990 0.871 ..P WKT 2010 07 03 20 39 55 31.3200 -97.3300 251.000 122.0 93.627 3.890 -999.990 -999.990 0.936 ..P WKT 2010 07 03 20 44 55 31.3200 -97.3300 251.000 457.0 95.906 4.910 -999.990 -999.990 0.959 ..P WKT 2010 07 03 20 49 55 31.3200 -97.3300 251.000 30.0 88.941 6.200 -999.990 -999.990 0.889 ..P WKT 2010 07 03 20 54 55 31.3200 -97.3300 251.000 122.0 102.906 5.430 -999.990 -999.990 1.029 ..P WKT 2010 07 03 20 59 55 31.3200 -97.3300 251.000 457.0 87.791 3.990 -999.990 -999.990 0.878 ..P WKT 2010 07 03 21 09 55 31.3200 -97.3300 251.000 30.0 88.019 3.620 -999.990 -999.990 0.880 ..P WKT 2010 07 03 21 14 55 31.3200 -97.3300 251.000 122.0 93.709 5.070 -999.990 -999.990 0.937 ..P WKT 2010 07 03 21 19 55 31.3200 -97.3300 251.000 457.0 87.452 6.440 -999.990 -999.990 0.875 ..P WKT 2010 07 03 21 24 55 31.3200 -97.3300 251.000 30.0 86.897 4.710 -999.990 -999.990 0.869 ..P WKT 2010 07 03 21 29 55 31.3200 -97.3300 251.000 122.0 94.756 3.930 -999.990 -999.990 0.948 ..P WKT 2010 07 03 21 34 55 31.3200 -97.3300 251.000 457.0 93.928 4.200 -999.990 -999.990 0.939 ..P WKT 2010 07 03 21 44 55 31.3200 -97.3300 251.000 30.0 94.483 3.520 -999.990 -999.990 0.945 ..P WKT 2010 07 03 21 49 55 31.3200 -97.3300 251.000 122.0 104.000 3.880 -999.990 -999.990 1.040 ..P WKT 2010 07 03 21 54 55 31.3200 -97.3300 251.000 457.0 93.043 5.360 -999.990 -999.990 0.930 ..P WKT 2010 07 03 21 59 55 31.3200 -97.3300 251.000 30.0 96.727 4.210 -999.990 -999.990 0.967 ..P WKT 2010 07 03 22 04 55 31.3200 -97.3300 251.000 122.0 100.818 3.470 -999.990 -999.990 1.008 ..P WKT 2010 07 03 22 09 55 31.3200 -97.3300 251.000 457.0 90.545 3.170 -999.990 -999.990 0.905 ..P WKT 2010 07 03 22 19 55 31.3200 -97.3300 251.000 30.0 89.940 2.760 -999.990 -999.990 0.899 ..P WKT 2010 07 03 22 24 55 31.3200 -97.3300 251.000 122.0 86.465 3.590 -999.990 -999.990 0.865 ..P WKT 2010 07 03 22 29 55 31.3200 -97.3300 251.000 457.0 85.970 2.790 -999.990 -999.990 0.860 ..P WKT 2010 07 03 22 34 55 31.3200 -97.3300 251.000 30.0 71.671 4.140 -999.990 -999.990 0.717 ..P WKT 2010 07 03 22 39 55 31.3200 -97.3300 251.000 122.0 79.839 3.090 -999.990 -999.990 0.798 ..P WKT 2010 07 03 22 44 55 31.3200 -97.3300 251.000 457.0 79.616 2.090 -999.990 -999.990 0.796 ..P WKT 2010 07 03 22 54 55 31.3200 -97.3300 251.000 30.0 80.040 2.380 -999.990 -999.990 0.800 ..P WKT 2010 07 03 22 59 55 31.3200 -97.3300 251.000 122.0 84.201 3.850 -999.990 -999.990 0.842 ..P WKT 2010 07 03 23 04 55 31.3200 -97.3300 251.000 457.0 80.521 4.510 -999.990 -999.990 0.805 ..P WKT 2010 07 03 23 09 55 31.3200 -97.3300 251.000 30.0 70.085 3.610 -999.990 -999.990 0.701 ..P WKT 2010 07 03 23 14 55 31.3200 -97.3300 251.000 122.0 81.272 1.850 -999.990 -999.990 0.813 ..P WKT 2010 07 03 23 19 55 31.3200 -97.3300 251.000 457.0 80.297 1.780 -999.990 -999.990 0.803 ..P WKT 2010 07 03 23 29 55 31.3200 -97.3300 251.000 30.0 87.110 2.300 -999.990 -999.990 0.871 ..P WKT 2010 07 03 23 34 55 31.3200 -97.3300 251.000 122.0 89.764 1.920 -999.990 -999.990 0.898 ..P WKT 2010 07 03 23 39 55 31.3200 -97.3300 251.000 457.0 85.669 2.570 -999.990 -999.990 0.857 ..P WKT 2010 07 03 23 44 55 31.3200 -97.3300 251.000 30.0 84.544 3.870 -999.990 -999.990 0.845 ..P WKT 2010 07 03 23 49 55 31.3200 -97.3300 251.000 122.0 95.023 4.170 -999.990 -999.990 0.950 ..P WKT 2010 07 04 00 09 55 31.3200 -97.3300 251.000 457.0 77.508 3.000 -999.990 -999.990 0.775 ..P WKT 2010 07 04 00 10 25 31.3200 -97.3300 251.000 457.0 81.193 3.110 -999.990 -999.990 0.812 ..P WKT 2010 07 04 00 10 55 31.3200 -97.3300 251.000 457.0 83.529 3.100 -999.990 -999.990 0.835 ..P WKT 2010 07 04 00 11 25 31.3200 -97.3300 251.000 457.0 78.579 2.920 -999.990 -999.990 0.786 ..P WKT 2010 07 04 00 11 55 31.3200 -97.3300 251.000 457.0 78.486 3.120 -999.990 -999.990 0.785 ..P WKT 2010 07 04 00 12 25 31.3200 -97.3300 251.000 457.0 78.662 3.120 -999.990 -999.990 0.787 ..P WKT 2010 07 04 00 12 55 31.3200 -97.3300 251.000 457.0 77.760 2.890 -999.990 -999.990 0.778 ..P WKT 2010 07 04 00 13 25 31.3200 -97.3300 251.000 457.0 78.207 3.370 -999.990 -999.990 0.782 ..P WKT 2010 07 04 00 13 55 31.3200 -97.3300 251.000 457.0 78.654 2.960 -999.990 -999.990 0.787 ..P WKT 2010 07 04 00 14 25 31.3200 -97.3300 251.000 457.0 78.426 2.950 -999.990 -999.990 0.784 ..P WKT 2010 07 04 00 14 55 31.3200 -97.3300 251.000 457.0 75.634 2.990 -999.990 -999.990 0.756 ..P WKT 2010 07 04 00 19 55 31.3200 -97.3300 251.000 30.0 89.414 3.860 -999.990 -999.990 0.894 ..P WKT 2010 07 04 00 24 55 31.3200 -97.3300 251.000 122.0 97.394 4.170 -999.990 -999.990 0.974 ..P WKT 2010 07 04 00 29 55 31.3200 -97.3300 251.000 457.0 77.703 4.950 -999.990 -999.990 0.777 ..P WKT 2010 07 04 00 34 55 31.3200 -97.3300 251.000 30.0 91.219 4.190 -999.990 -999.990 0.912 ..P WKT 2010 07 04 00 39 55 31.3200 -97.3300 251.000 122.0 97.988 4.270 -999.990 -999.990 0.980 ..P WKT 2010 07 04 00 44 55 31.3200 -97.3300 251.000 457.0 79.908 3.500 -999.990 -999.990 0.799 ..P WKT 2010 07 04 00 54 55 31.3200 -97.3300 251.000 30.0 90.674 2.540 -999.990 -999.990 0.907 ..P WKT 2010 07 04 00 59 55 31.3200 -97.3300 251.000 122.0 92.914 4.380 -999.990 -999.990 0.929 ..P WKT 2010 07 04 01 04 55 31.3200 -97.3300 251.000 457.0 79.885 4.580 -999.990 -999.990 0.799 ..P WKT 2010 07 04 01 09 55 31.3200 -97.3300 251.000 30.0 88.478 3.740 -999.990 -999.990 0.885 ..P WKT 2010 07 04 01 14 55 31.3200 -97.3300 251.000 122.0 88.285 3.170 -999.990 -999.990 0.883 ..P WKT 2010 07 04 01 19 55 31.3200 -97.3300 251.000 457.0 88.229 3.200 -999.990 -999.990 0.882 ..P WKT 2010 07 04 01 29 55 31.3200 -97.3300 251.000 30.0 93.256 2.640 -999.990 -999.990 0.933 ..P WKT 2010 07 04 01 34 55 31.3200 -97.3300 251.000 122.0 93.876 3.850 -999.990 -999.990 0.939 ..P WKT 2010 07 04 01 39 55 31.3200 -97.3300 251.000 457.0 86.379 4.040 -999.990 -999.990 0.864 ..P WKT 2010 07 04 01 44 55 31.3200 -97.3300 251.000 30.0 88.488 3.200 -999.990 -999.990 0.885 ..P WKT 2010 07 04 01 49 55 31.3200 -97.3300 251.000 122.0 87.213 2.420 -999.990 -999.990 0.872 ..P WKT 2010 07 04 01 54 55 31.3200 -97.3300 251.000 457.0 82.284 2.810 -999.990 -999.990 0.823 ..P WKT 2010 07 04 02 04 55 31.3200 -97.3300 251.000 30.0 84.857 3.430 -999.990 -999.990 0.849 ..P WKT 2010 07 04 02 09 55 31.3200 -97.3300 251.000 122.0 84.374 2.680 -999.990 -999.990 0.844 ..P WKT 2010 07 04 02 14 55 31.3200 -97.3300 251.000 457.0 77.119 3.470 -999.990 -999.990 0.771 ..P WKT 2010 07 04 02 19 55 31.3200 -97.3300 251.000 30.0 83.950 2.730 -999.990 -999.990 0.840 ..P WKT 2010 07 04 02 24 55 31.3200 -97.3300 251.000 122.0 86.990 3.420 -999.990 -999.990 0.870 ..P WKT 2010 07 04 02 29 55 31.3200 -97.3300 251.000 457.0 88.404 2.970 -999.990 -999.990 0.884 ..P WKT 2010 07 04 02 39 55 31.3200 -97.3300 251.000 30.0 91.099 3.470 -999.990 -999.990 0.911 ..P WKT 2010 07 04 02 44 55 31.3200 -97.3300 251.000 122.0 92.379 3.330 -999.990 -999.990 0.924 ..P WKT 2010 07 04 02 49 55 31.3200 -97.3300 251.000 457.0 88.236 2.980 -999.990 -999.990 0.882 ..P WKT 2010 07 04 02 54 55 31.3200 -97.3300 251.000 30.0 95.483 2.870 -999.990 -999.990 0.955 ..P WKT 2010 07 04 02 59 55 31.3200 -97.3300 251.000 122.0 97.579 2.800 -999.990 -999.990 0.976 ..P WKT 2010 07 04 03 04 55 31.3200 -97.3300 251.000 457.0 80.140 2.890 -999.990 -999.990 0.801 ..P WKT 2010 07 04 03 14 55 31.3200 -97.3300 251.000 30.0 100.031 1.900 -999.990 -999.990 1.000 ..P WKT 2010 07 04 03 19 55 31.3200 -97.3300 251.000 122.0 104.261 2.110 -999.990 -999.990 1.043 ..P WKT 2010 07 04 03 24 55 31.3200 -97.3300 251.000 457.0 91.388 2.010 -999.990 -999.990 0.914 ..P WKT 2010 07 04 03 29 55 31.3200 -97.3300 251.000 30.0 104.307 3.180 -999.990 -999.990 1.043 ..P WKT 2010 07 04 03 34 55 31.3200 -97.3300 251.000 122.0 116.688 3.620 -999.990 -999.990 1.167 ..P WKT 2010 07 04 03 39 55 31.3200 -97.3300 251.000 457.0 88.056 2.140 -999.990 -999.990 0.881 ..P WKT 2010 07 04 03 49 55 31.3200 -97.3300 251.000 30.0 111.446 2.200 -999.990 -999.990 1.114 ..P WKT 2010 07 04 03 54 55 31.3200 -97.3300 251.000 122.0 120.284 3.630 -999.990 -999.990 1.203 ..P WKT 2010 07 04 03 59 55 31.3200 -97.3300 251.000 457.0 85.635 3.330 -999.990 -999.990 0.856 ..P WKT 2010 07 04 04 04 55 31.3200 -97.3300 251.000 30.0 111.598 3.300 -999.990 -999.990 1.116 ..P WKT 2010 07 04 04 09 55 31.3200 -97.3300 251.000 122.0 114.458 4.570 -999.990 -999.990 1.145 ..P WKT 2010 07 04 04 14 55 31.3200 -97.3300 251.000 457.0 74.898 4.750 -999.990 -999.990 0.749 ..P WKT 2010 07 04 04 24 55 31.3200 -97.3300 251.000 30.0 113.640 4.460 -999.990 -999.990 1.136 ..P WKT 2010 07 04 04 29 55 31.3200 -97.3300 251.000 122.0 118.115 3.980 -999.990 -999.990 1.181 ..P WKT 2010 07 04 04 34 55 31.3200 -97.3300 251.000 457.0 78.646 3.350 -999.990 -999.990 0.786 ..P WKT 2010 07 04 04 39 55 31.3200 -97.3300 251.000 30.0 110.604 4.350 -999.990 -999.990 1.106 ..P WKT 2010 07 04 04 44 55 31.3200 -97.3300 251.000 122.0 115.762 3.040 -999.990 -999.990 1.158 ..P WKT 2010 07 04 04 49 55 31.3200 -97.3300 251.000 457.0 81.990 4.150 -999.990 -999.990 0.820 ..P WKT 2010 07 04 05 04 55 31.3200 -97.3300 251.000 30.0 116.529 2.880 -999.990 -999.990 1.165 ..P WKT 2010 07 04 05 09 55 31.3200 -97.3300 251.000 122.0 116.995 2.750 -999.990 -999.990 1.170 ..P WKT 2010 07 04 05 14 55 31.3200 -97.3300 251.000 457.0 78.772 2.610 -999.990 -999.990 0.788 ..P WKT 2010 07 04 05 19 55 31.3200 -97.3300 251.000 30.0 118.336 2.440 -999.990 -999.990 1.183 ..P WKT 2010 07 04 05 24 55 31.3200 -97.3300 251.000 122.0 111.307 2.550 -999.990 -999.990 1.113 ..P WKT 2010 07 04 05 29 55 31.3200 -97.3300 251.000 457.0 95.008 4.580 -999.990 -999.990 0.950 ..P WKT 2010 07 04 05 39 55 31.3200 -97.3300 251.000 30.0 107.802 2.630 -999.990 -999.990 1.078 ..P WKT 2010 07 04 05 44 55 31.3200 -97.3300 251.000 122.0 100.229 3.170 -999.990 -999.990 1.002 ..P WKT 2010 07 04 05 49 55 31.3200 -97.3300 251.000 457.0 94.154 2.770 -999.990 -999.990 0.942 ..P WKT 2010 07 04 05 54 55 31.3200 -97.3300 251.000 30.0 107.173 3.180 -999.990 -999.990 1.072 ..P WKT 2010 07 04 05 59 55 31.3200 -97.3300 251.000 122.0 106.417 3.470 -999.990 -999.990 1.064 ..P WKT 2010 07 04 06 04 55 31.3200 -97.3300 251.000 457.0 88.197 4.330 -999.990 -999.990 0.882 ..P WKT 2010 07 04 06 14 55 31.3200 -97.3300 251.000 30.0 99.255 3.110 -999.990 -999.990 0.993 ..P WKT 2010 07 04 06 19 55 31.3200 -97.3300 251.000 122.0 102.339 2.720 -999.990 -999.990 1.023 ..P WKT 2010 07 04 06 24 55 31.3200 -97.3300 251.000 457.0 81.122 2.980 -999.990 -999.990 0.811 ..P WKT 2010 07 04 06 29 55 31.3200 -97.3300 251.000 30.0 104.142 2.570 -999.990 -999.990 1.041 ..P WKT 2010 07 04 06 34 55 31.3200 -97.3300 251.000 122.0 98.215 3.170 -999.990 -999.990 0.982 ..P WKT 2010 07 04 06 39 55 31.3200 -97.3300 251.000 457.0 88.460 4.220 -999.990 -999.990 0.885 ..P WKT 2010 07 04 06 49 55 31.3200 -97.3300 251.000 30.0 90.610 2.230 -999.990 -999.990 0.906 ..P WKT 2010 07 04 06 54 55 31.3200 -97.3300 251.000 122.0 96.236 2.410 -999.990 -999.990 0.962 ..P WKT 2010 07 04 06 59 55 31.3200 -97.3300 251.000 457.0 93.388 3.320 -999.990 -999.990 0.934 ..P WKT 2010 07 04 07 04 55 31.3200 -97.3300 251.000 30.0 93.273 2.760 -999.990 -999.990 0.933 ..P WKT 2010 07 04 07 09 55 31.3200 -97.3300 251.000 122.0 99.994 2.250 -999.990 -999.990 1.000 ..P WKT 2010 07 04 07 14 55 31.3200 -97.3300 251.000 457.0 85.659 2.960 -999.990 -999.990 0.857 ..P WKT 2010 07 04 07 24 55 31.3200 -97.3300 251.000 30.0 102.819 4.540 -999.990 -999.990 1.028 ..P WKT 2010 07 04 07 29 55 31.3200 -97.3300 251.000 122.0 95.200 2.040 -999.990 -999.990 0.952 ..P WKT 2010 07 04 07 34 55 31.3200 -97.3300 251.000 457.0 89.495 2.490 -999.990 -999.990 0.895 ..P WKT 2010 07 04 07 39 55 31.3200 -97.3300 251.000 30.0 98.842 3.020 -999.990 -999.990 0.988 ..P WKT 2010 07 04 07 44 55 31.3200 -97.3300 251.000 122.0 102.990 3.120 -999.990 -999.990 1.030 ..P WKT 2010 07 04 07 49 55 31.3200 -97.3300 251.000 457.0 92.903 2.260 -999.990 -999.990 0.929 ..P WKT 2010 07 04 07 59 55 31.3200 -97.3300 251.000 30.0 95.098 3.610 -999.990 -999.990 0.951 ..P WKT 2010 07 04 08 04 55 31.3200 -97.3300 251.000 122.0 96.979 3.270 -999.990 -999.990 0.970 ..P WKT 2010 07 04 08 09 55 31.3200 -97.3300 251.000 457.0 85.025 3.150 -999.990 -999.990 0.850 ..P WKT 2010 07 04 08 14 55 31.3200 -97.3300 251.000 30.0 87.453 3.690 -999.990 -999.990 0.875 ..P WKT 2010 07 04 08 19 55 31.3200 -97.3300 251.000 122.0 94.815 3.010 -999.990 -999.990 0.948 ..P WKT 2010 07 04 08 24 55 31.3200 -97.3300 251.000 457.0 78.195 3.630 -999.990 -999.990 0.782 ..P WKT 2010 07 04 08 34 55 31.3200 -97.3300 251.000 30.0 88.790 2.620 -999.990 -999.990 0.888 ..P WKT 2010 07 04 08 39 55 31.3200 -97.3300 251.000 122.0 90.105 3.030 -999.990 -999.990 0.901 ..P WKT 2010 07 04 08 44 55 31.3200 -97.3300 251.000 457.0 77.979 3.100 -999.990 -999.990 0.780 ..P WKT 2010 07 04 08 49 55 31.3200 -97.3300 251.000 30.0 85.190 2.860 -999.990 -999.990 0.852 ..P WKT 2010 07 04 08 54 55 31.3200 -97.3300 251.000 122.0 85.132 3.290 -999.990 -999.990 0.851 ..P WKT 2010 07 04 08 59 55 31.3200 -97.3300 251.000 457.0 73.137 2.280 -999.990 -999.990 0.731 ..P WKT 2010 07 04 09 09 55 31.3200 -97.3300 251.000 30.0 85.606 2.750 -999.990 -999.990 0.856 ..P WKT 2010 07 04 09 14 55 31.3200 -97.3300 251.000 122.0 93.471 2.680 -999.990 -999.990 0.935 ..P WKT 2010 07 04 09 19 55 31.3200 -97.3300 251.000 457.0 82.667 3.420 -999.990 -999.990 0.827 ..P WKT 2010 07 04 09 24 55 31.3200 -97.3300 251.000 30.0 83.805 3.310 -999.990 -999.990 0.838 ..P WKT 2010 07 04 09 29 55 31.3200 -97.3300 251.000 122.0 84.944 4.420 -999.990 -999.990 0.849 ..P WKT 2010 07 04 09 34 55 31.3200 -97.3300 251.000 457.0 77.292 3.150 -999.990 -999.990 0.773 ..P WKT 2010 07 04 09 44 55 31.3200 -97.3300 251.000 30.0 87.322 3.500 -999.990 -999.990 0.873 ..P WKT 2010 07 04 09 49 55 31.3200 -97.3300 251.000 122.0 89.895 3.360 -999.990 -999.990 0.899 ..P WKT 2010 07 04 09 54 55 31.3200 -97.3300 251.000 457.0 75.426 3.280 -999.990 -999.990 0.754 ..P WKT 2010 07 04 09 59 55 31.3200 -97.3300 251.000 30.0 86.658 3.970 -999.990 -999.990 0.867 ..P WKT 2010 07 04 10 04 55 31.3200 -97.3300 251.000 122.0 88.682 3.720 -999.990 -999.990 0.887 ..P WKT 2010 07 04 10 09 55 31.3200 -97.3300 251.000 457.0 79.844 3.790 -999.990 -999.990 0.798 ..P WKT 2010 07 04 10 19 55 31.3200 -97.3300 251.000 30.0 83.067 3.750 -999.990 -999.990 0.831 ..P WKT 2010 07 04 10 24 55 31.3200 -97.3300 251.000 122.0 80.277 3.330 -999.990 -999.990 0.803 ..P WKT 2010 07 04 10 29 55 31.3200 -97.3300 251.000 457.0 82.165 4.640 -999.990 -999.990 0.822 ..P WKT 2010 07 04 10 34 55 31.3200 -97.3300 251.000 30.0 82.126 3.900 -999.990 -999.990 0.821 ..P WKT 2010 07 04 10 39 55 31.3200 -97.3300 251.000 122.0 85.941 3.540 -999.990 -999.990 0.859 ..P WKT 2010 07 04 10 44 55 31.3200 -97.3300 251.000 457.0 83.150 4.320 -999.990 -999.990 0.832 ..P WKT 2010 07 04 10 54 55 31.3200 -97.3300 251.000 30.0 81.145 3.650 -999.990 -999.990 0.811 ..P WKT 2010 07 04 10 59 55 31.3200 -97.3300 251.000 122.0 80.279 3.930 -999.990 -999.990 0.803 ..P WKT 2010 07 04 11 04 55 31.3200 -97.3300 251.000 457.0 77.761 5.220 -999.990 -999.990 0.778 ..P WKT 2010 07 04 11 09 55 31.3200 -97.3300 251.000 30.0 79.375 3.980 -999.990 -999.990 0.794 ..P WKT 2010 07 04 11 14 55 31.3200 -97.3300 251.000 122.0 78.509 3.600 -999.990 -999.990 0.785 ..P WKT 2010 07 04 11 19 55 31.3200 -97.3300 251.000 457.0 82.328 2.880 -999.990 -999.990 0.823 ..P WKT 2010 07 04 11 29 55 31.3200 -97.3300 251.000 30.0 79.894 4.110 -999.990 -999.990 0.799 ..P WKT 2010 07 04 11 34 55 31.3200 -97.3300 251.000 122.0 83.567 3.340 -999.990 -999.990 0.836 ..P WKT 2010 07 04 11 39 55 31.3200 -97.3300 251.000 457.0 80.895 3.960 -999.990 -999.990 0.809 ..P WKT 2010 07 04 11 44 55 31.3200 -97.3300 251.000 30.0 83.464 4.080 -999.990 -999.990 0.835 ..P WKT 2010 07 04 11 49 55 31.3200 -97.3300 251.000 122.0 87.966 3.230 -999.990 -999.990 0.880 ..P WKT 2010 07 04 12 09 55 31.3200 -97.3300 251.000 457.0 90.899 3.270 -999.990 -999.990 0.909 ..P WKT 2010 07 04 12 10 25 31.3200 -97.3300 251.000 457.0 83.573 3.220 -999.990 -999.990 0.836 ..P WKT 2010 07 04 12 10 55 31.3200 -97.3300 251.000 457.0 81.214 2.620 -999.990 -999.990 0.812 ..P WKT 2010 07 04 12 11 25 31.3200 -97.3300 251.000 457.0 80.788 2.500 -999.990 -999.990 0.808 ..P WKT 2010 07 04 12 11 55 31.3200 -97.3300 251.000 457.0 86.020 3.750 -999.990 -999.990 0.860 ..P WKT 2010 07 04 12 12 25 31.3200 -97.3300 251.000 457.0 82.144 3.650 -999.990 -999.990 0.821 ..P WKT 2010 07 04 12 12 55 31.3200 -97.3300 251.000 457.0 86.686 3.150 -999.990 -999.990 0.867 ..P WKT 2010 07 04 12 13 25 31.3200 -97.3300 251.000 457.0 83.499 3.680 -999.990 -999.990 0.835 ..P WKT 2010 07 04 12 13 55 31.3200 -97.3300 251.000 457.0 73.688 4.100 -999.990 -999.990 0.737 ..P WKT 2010 07 04 12 14 25 31.3200 -97.3300 251.000 457.0 76.851 3.680 -999.990 -999.990 0.769 ..P WKT 2010 07 04 12 14 55 31.3200 -97.3300 251.000 457.0 77.390 2.670 -999.990 -999.990 0.774 ..P WKT 2010 07 04 12 19 55 31.3200 -97.3300 251.000 30.0 86.514 3.480 -999.990 -999.990 0.865 ..P WKT 2010 07 04 12 24 55 31.3200 -97.3300 251.000 122.0 94.119 4.440 -999.990 -999.990 0.941 ..P WKT 2010 07 04 12 29 55 31.3200 -97.3300 251.000 457.0 83.646 3.030 -999.990 -999.990 0.836 ..P WKT 2010 07 04 12 34 55 31.3200 -97.3300 251.000 30.0 86.421 3.670 -999.990 -999.990 0.864 ..P WKT 2010 07 04 12 39 55 31.3200 -97.3300 251.000 122.0 91.681 3.590 -999.990 -999.990 0.917 ..P WKT 2010 07 04 12 44 55 31.3200 -97.3300 251.000 457.0 86.452 3.930 -999.990 -999.990 0.865 ..P WKT 2010 07 04 12 54 55 31.3200 -97.3300 251.000 30.0 91.057 4.230 -999.990 -999.990 0.911 ..P WKT 2010 07 04 12 59 55 31.3200 -97.3300 251.000 122.0 95.233 4.810 -999.990 -999.990 0.952 ..P WKT 2010 07 04 13 04 55 31.3200 -97.3300 251.000 457.0 80.775 4.420 -999.990 -999.990 0.808 ..P WKT 2010 07 04 13 09 55 31.3200 -97.3300 251.000 30.0 82.881 4.780 -999.990 -999.990 0.829 ..P WKT 2010 07 04 13 14 55 31.3200 -97.3300 251.000 122.0 88.851 4.750 -999.990 -999.990 0.889 ..P WKT 2010 07 04 13 19 55 31.3200 -97.3300 251.000 457.0 76.601 5.260 -999.990 -999.990 0.766 ..P WKT 2010 07 04 13 29 55 31.3200 -97.3300 251.000 30.0 85.228 4.840 -999.990 -999.990 0.852 ..P WKT 2010 07 04 13 34 55 31.3200 -97.3300 251.000 122.0 88.991 3.800 -999.990 -999.990 0.890 ..P WKT 2010 07 04 13 39 55 31.3200 -97.3300 251.000 457.0 85.575 3.840 -999.990 -999.990 0.856 ..P WKT 2010 07 04 13 44 55 31.3200 -97.3300 251.000 30.0 93.616 3.820 -999.990 -999.990 0.936 ..P WKT 2010 07 04 13 49 55 31.3200 -97.3300 251.000 122.0 85.369 3.290 -999.990 -999.990 0.854 ..P WKT 2010 07 04 13 54 55 31.3200 -97.3300 251.000 457.0 77.397 3.050 -999.990 -999.990 0.774 ..P WKT 2010 07 04 14 04 55 31.3200 -97.3300 251.000 30.0 91.923 3.300 -999.990 -999.990 0.919 ..P WKT 2010 07 04 14 09 55 31.3200 -97.3300 251.000 122.0 90.952 4.960 -999.990 -999.990 0.910 ..P WKT 2010 07 04 14 14 55 31.3200 -97.3300 251.000 457.0 82.803 3.140 -999.990 -999.990 0.828 ..P WKT 2010 07 04 14 19 55 31.3200 -97.3300 251.000 30.0 86.802 2.520 -999.990 -999.990 0.868 ..P WKT 2010 07 04 14 24 55 31.3200 -97.3300 251.000 122.0 88.593 5.610 -999.990 -999.990 0.886 ..P WKT 2010 07 04 14 29 55 31.3200 -97.3300 251.000 457.0 76.852 2.900 -999.990 -999.990 0.769 ..P WKT 2010 07 04 14 39 55 31.3200 -97.3300 251.000 30.0 84.141 2.780 -999.990 -999.990 0.841 ..P WKT 2010 07 04 14 44 55 31.3200 -97.3300 251.000 122.0 85.774 2.330 -999.990 -999.990 0.858 ..P WKT 2010 07 04 14 49 55 31.3200 -97.3300 251.000 457.0 77.741 2.480 -999.990 -999.990 0.777 ..P WKT 2010 07 04 14 54 55 31.3200 -97.3300 251.000 30.0 79.650 2.620 -999.990 -999.990 0.797 ..P WKT 2010 07 04 14 59 55 31.3200 -97.3300 251.000 122.0 90.120 3.720 -999.990 -999.990 0.901 ..P WKT 2010 07 04 15 04 55 31.3200 -97.3300 251.000 457.0 78.496 2.250 -999.990 -999.990 0.785 ..P WKT 2010 07 04 15 14 55 31.3200 -97.3300 251.000 30.0 83.025 2.680 -999.990 -999.990 0.830 ..P WKT 2010 07 04 15 19 55 31.3200 -97.3300 251.000 122.0 87.578 2.670 -999.990 -999.990 0.876 ..P WKT 2010 07 04 15 24 55 31.3200 -97.3300 251.000 457.0 83.845 2.950 -999.990 -999.990 0.838 ..P WKT 2010 07 04 15 29 55 31.3200 -97.3300 251.000 30.0 87.845 2.200 -999.990 -999.990 0.878 ..P WKT 2010 07 04 15 34 55 31.3200 -97.3300 251.000 122.0 84.388 2.480 -999.990 -999.990 0.844 ..P WKT 2010 07 04 15 39 55 31.3200 -97.3300 251.000 457.0 79.274 3.760 -999.990 -999.990 0.793 ..P WKT 2010 07 04 15 49 55 31.3200 -97.3300 251.000 30.0 81.928 2.960 -999.990 -999.990 0.819 ..P WKT 2010 07 04 15 54 55 31.3200 -97.3300 251.000 122.0 92.735 3.450 -999.990 -999.990 0.927 ..P WKT 2010 07 04 15 59 55 31.3200 -97.3300 251.000 457.0 80.479 2.870 -999.990 -999.990 0.805 ..P WKT 2010 07 04 16 04 55 31.3200 -97.3300 251.000 30.0 84.243 2.810 -999.990 -999.990 0.842 ..P WKT 2010 07 04 16 09 55 31.3200 -97.3300 251.000 122.0 92.704 3.570 -999.990 -999.990 0.927 ..P WKT 2010 07 04 16 14 55 31.3200 -97.3300 251.000 457.0 80.308 2.620 -999.990 -999.990 0.803 ..P WKT 2010 07 04 16 24 55 31.3200 -97.3300 251.000 30.0 86.771 3.050 -999.990 -999.990 0.868 ..P WKT 2010 07 04 16 29 55 31.3200 -97.3300 251.000 122.0 87.536 2.930 -999.990 -999.990 0.875 ..P WKT 2010 07 04 16 34 55 31.3200 -97.3300 251.000 457.0 79.599 2.660 -999.990 -999.990 0.796 ..P WKT 2010 07 04 16 39 55 31.3200 -97.3300 251.000 30.0 81.054 2.310 -999.990 -999.990 0.811 ..P WKT 2010 07 04 16 44 55 31.3200 -97.3300 251.000 122.0 94.390 2.600 -999.990 -999.990 0.944 ..P WKT 2010 07 04 16 49 55 31.3200 -97.3300 251.000 457.0 85.485 4.650 -999.990 -999.990 0.855 ..P WKT 2010 07 04 17 04 55 31.3200 -97.3300 251.000 30.0 87.663 3.010 -999.990 -999.990 0.877 ..P WKT 2010 07 04 17 09 55 31.3200 -97.3300 251.000 122.0 95.139 4.200 -999.990 -999.990 0.951 ..P WKT 2010 07 04 17 14 55 31.3200 -97.3300 251.000 457.0 80.925 3.320 -999.990 -999.990 0.809 ..P WKT 2010 07 04 17 19 55 31.3200 -97.3300 251.000 30.0 91.439 3.700 -999.990 -999.990 0.914 ..P WKT 2010 07 04 17 24 55 31.3200 -97.3300 251.000 122.0 93.251 3.630 -999.990 -999.990 0.933 ..P WKT 2010 07 04 17 29 55 31.3200 -97.3300 251.000 457.0 86.912 3.470 -999.990 -999.990 0.869 ..P WKT 2010 07 04 17 39 55 31.3200 -97.3300 251.000 30.0 90.515 3.190 -999.990 -999.990 0.905 ..P WKT 2010 07 04 17 44 55 31.3200 -97.3300 251.000 122.0 90.787 3.350 -999.990 -999.990 0.908 ..P WKT 2010 07 04 17 49 55 31.3200 -97.3300 251.000 457.0 88.434 3.610 -999.990 -999.990 0.884 ..P WKT 2010 07 04 17 54 55 31.3200 -97.3300 251.000 30.0 93.956 3.170 -999.990 -999.990 0.940 ..P WKT 2010 07 04 17 59 55 31.3200 -97.3300 251.000 122.0 97.544 2.640 -999.990 -999.990 0.975 ..P WKT 2010 07 04 18 04 55 31.3200 -97.3300 251.000 457.0 87.177 2.430 -999.990 -999.990 0.872 ..P WKT 2010 07 04 18 14 55 31.3200 -97.3300 251.000 30.0 88.510 2.070 -999.990 -999.990 0.885 ..P WKT 2010 07 04 18 19 55 31.3200 -97.3300 251.000 122.0 88.881 3.820 -999.990 -999.990 0.889 ..P WKT 2010 07 04 18 24 55 31.3200 -97.3300 251.000 457.0 81.790 3.450 -999.990 -999.990 0.818 ..P WKT 2010 07 04 18 29 55 31.3200 -97.3300 251.000 30.0 80.503 3.100 -999.990 -999.990 0.805 ..P WKT 2010 07 04 18 34 55 31.3200 -97.3300 251.000 122.0 89.164 3.280 -999.990 -999.990 0.892 ..P WKT 2010 07 04 18 39 55 31.3200 -97.3300 251.000 457.0 80.138 1.970 -999.990 -999.990 0.801 ..P WKT 2010 07 04 18 49 55 31.3200 -97.3300 251.000 30.0 80.209 2.380 -999.990 -999.990 0.802 ..P WKT 2010 07 04 18 54 55 31.3200 -97.3300 251.000 122.0 87.371 2.640 -999.990 -999.990 0.874 ..P WKT 2010 07 04 18 59 55 31.3200 -97.3300 251.000 457.0 82.647 2.720 -999.990 -999.990 0.826 ..P WKT 2010 07 04 19 04 55 31.3200 -97.3300 251.000 30.0 87.322 2.850 -999.990 -999.990 0.873 ..P WKT 2010 07 04 19 09 55 31.3200 -97.3300 251.000 122.0 91.445 2.660 -999.990 -999.990 0.914 ..P WKT 2010 07 04 19 14 55 31.3200 -97.3300 251.000 457.0 87.274 2.260 -999.990 -999.990 0.873 ..P WKT 2010 07 04 19 24 55 31.3200 -97.3300 251.000 30.0 88.865 2.850 -999.990 -999.990 0.889 ..P WKT 2010 07 04 19 29 55 31.3200 -97.3300 251.000 122.0 90.480 2.750 -999.990 -999.990 0.905 ..P WKT 2010 07 04 19 34 55 31.3200 -97.3300 251.000 457.0 83.249 2.320 -999.990 -999.990 0.832 ..P WKT 2010 07 04 19 39 55 31.3200 -97.3300 251.000 30.0 91.221 3.480 -999.990 -999.990 0.912 ..P WKT 2010 07 04 19 44 55 31.3200 -97.3300 251.000 122.0 96.153 3.020 -999.990 -999.990 0.962 ..P WKT 2010 07 04 19 49 55 31.3200 -97.3300 251.000 457.0 90.166 5.160 -999.990 -999.990 0.902 ..P WKT 2010 07 04 19 59 55 31.3200 -97.3300 251.000 30.0 90.354 4.860 -999.990 -999.990 0.904 ..P WKT 2010 07 04 20 04 55 31.3200 -97.3300 251.000 122.0 99.710 2.810 -999.990 -999.990 0.997 ..P WKT 2010 07 04 20 09 55 31.3200 -97.3300 251.000 457.0 92.479 2.460 -999.990 -999.990 0.925 ..P WKT 2010 07 04 20 14 55 31.3200 -97.3300 251.000 30.0 91.745 2.680 -999.990 -999.990 0.917 ..P WKT 2010 07 04 20 19 55 31.3200 -97.3300 251.000 122.0 95.710 3.770 -999.990 -999.990 0.957 ..P WKT 2010 07 04 20 24 55 31.3200 -97.3300 251.000 457.0 91.657 3.320 -999.990 -999.990 0.917 ..P WKT 2010 07 04 20 34 55 31.3200 -97.3300 251.000 30.0 89.457 2.520 -999.990 -999.990 0.895 ..P WKT 2010 07 04 20 39 55 31.3200 -97.3300 251.000 122.0 101.400 2.020 -999.990 -999.990 1.014 ..P WKT 2010 07 04 20 44 55 31.3200 -97.3300 251.000 457.0 88.046 1.850 -999.990 -999.990 0.880 ..P WKT 2010 07 04 20 49 55 31.3200 -97.3300 251.000 30.0 106.073 2.560 -999.990 -999.990 1.061 ..P WKT 2010 07 04 20 54 55 31.3200 -97.3300 251.000 122.0 97.418 2.240 -999.990 -999.990 0.974 ..P WKT 2010 07 04 20 59 55 31.3200 -97.3300 251.000 457.0 93.187 2.620 -999.990 -999.990 0.932 ..P WKT 2010 07 04 21 09 55 31.3200 -97.3300 251.000 30.0 93.653 2.230 -999.990 -999.990 0.937 ..P WKT 2010 07 04 21 14 55 31.3200 -97.3300 251.000 122.0 97.381 2.140 -999.990 -999.990 0.974 ..P WKT 2010 07 04 21 19 55 31.3200 -97.3300 251.000 457.0 89.635 2.820 -999.990 -999.990 0.896 ..P WKT 2010 07 04 21 24 55 31.3200 -97.3300 251.000 30.0 97.650 4.200 -999.990 -999.990 0.977 ..P WKT 2010 07 04 21 29 55 31.3200 -97.3300 251.000 122.0 104.144 4.010 -999.990 -999.990 1.041 ..P WKT 2010 07 04 21 34 55 31.3200 -97.3300 251.000 457.0 97.227 2.300 -999.990 -999.990 0.972 ..P WKT 2010 07 04 21 44 55 31.3200 -97.3300 251.000 30.0 92.952 2.470 -999.990 -999.990 0.930 ..P WKT 2010 07 04 21 49 55 31.3200 -97.3300 251.000 122.0 91.585 3.000 -999.990 -999.990 0.916 ..P WKT 2010 07 04 21 54 55 31.3200 -97.3300 251.000 457.0 86.345 2.450 -999.990 -999.990 0.863 ..P WKT 2010 07 04 21 59 55 31.3200 -97.3300 251.000 30.0 96.041 4.250 -999.990 -999.990 0.960 ..P WKT 2010 07 04 22 04 55 31.3200 -97.3300 251.000 122.0 102.971 3.290 -999.990 -999.990 1.030 ..P WKT 2010 07 04 22 09 55 31.3200 -97.3300 251.000 457.0 89.158 2.020 -999.990 -999.990 0.892 ..P WKT 2010 07 04 22 19 55 31.3200 -97.3300 251.000 30.0 93.851 2.980 -999.990 -999.990 0.939 ..P WKT 2010 07 04 22 24 55 31.3200 -97.3300 251.000 122.0 94.104 3.060 -999.990 -999.990 0.941 ..P WKT 2010 07 04 22 29 55 31.3200 -97.3300 251.000 457.0 91.867 2.340 -999.990 -999.990 0.919 ..P WKT 2010 07 04 22 34 55 31.3200 -97.3300 251.000 30.0 97.375 1.980 -999.990 -999.990 0.974 ..P WKT 2010 07 04 22 39 55 31.3200 -97.3300 251.000 122.0 100.117 3.250 -999.990 -999.990 1.001 ..P WKT 2010 07 04 22 44 55 31.3200 -97.3300 251.000 457.0 93.731 2.430 -999.990 -999.990 0.937 ..P WKT 2010 07 04 22 54 55 31.3200 -97.3300 251.000 30.0 89.850 2.200 -999.990 -999.990 0.898 ..P WKT 2010 07 04 22 59 55 31.3200 -97.3300 251.000 122.0 90.419 2.690 -999.990 -999.990 0.904 ..P WKT 2010 07 04 23 04 55 31.3200 -97.3300 251.000 457.0 83.519 3.350 -999.990 -999.990 0.835 ..P WKT 2010 07 04 23 09 55 31.3200 -97.3300 251.000 30.0 88.514 3.600 -999.990 -999.990 0.885 ..P WKT 2010 07 04 23 14 55 31.3200 -97.3300 251.000 122.0 88.529 3.000 -999.990 -999.990 0.885 ..P WKT 2010 07 04 23 19 55 31.3200 -97.3300 251.000 457.0 90.481 2.970 -999.990 -999.990 0.905 ..P WKT 2010 07 04 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 07 04 23 34 55 31.3200 -97.3300 251.000 122.0 89.179 3.050 -999.990 -999.990 0.892 ..P WKT 2010 07 04 23 39 55 31.3200 -97.3300 251.000 457.0 87.414 3.770 -999.990 -999.990 0.874 ..P WKT 2010 07 04 23 44 55 31.3200 -97.3300 251.000 30.0 87.308 2.740 -999.990 -999.990 0.873 ..P WKT 2010 07 04 23 49 55 31.3200 -97.3300 251.000 122.0 94.395 2.630 -999.990 -999.990 0.944 ..P WKT 2010 07 05 00 09 55 31.3200 -97.3300 251.000 457.0 87.708 2.290 -999.990 -999.990 0.877 ..P WKT 2010 07 05 00 10 25 31.3200 -97.3300 251.000 457.0 87.134 3.150 -999.990 -999.990 0.871 ..P WKT 2010 07 05 00 10 55 31.3200 -97.3300 251.000 457.0 83.657 2.000 -999.990 -999.990 0.837 ..P WKT 2010 07 05 00 11 25 31.3200 -97.3300 251.000 457.0 86.127 3.810 -999.990 -999.990 0.861 ..P WKT 2010 07 05 00 11 55 31.3200 -97.3300 251.000 457.0 95.236 2.830 -999.990 -999.990 0.952 ..P WKT 2010 07 05 00 12 25 31.3200 -97.3300 251.000 457.0 88.438 4.640 -999.990 -999.990 0.884 ..P WKT 2010 07 05 00 12 55 31.3200 -97.3300 251.000 457.0 91.876 4.600 -999.990 -999.990 0.919 ..P WKT 2010 07 05 00 13 25 31.3200 -97.3300 251.000 457.0 94.207 2.470 -999.990 -999.990 0.942 ..P WKT 2010 07 05 00 13 55 31.3200 -97.3300 251.000 457.0 86.442 4.730 -999.990 -999.990 0.864 ..P WKT 2010 07 05 00 14 25 31.3200 -97.3300 251.000 457.0 81.304 2.870 -999.990 -999.990 0.813 ..P WKT 2010 07 05 00 14 55 31.3200 -97.3300 251.000 457.0 90.274 3.040 -999.990 -999.990 0.903 ..P WKT 2010 07 05 00 19 55 31.3200 -97.3300 251.000 30.0 88.968 2.250 -999.990 -999.990 0.890 ..P WKT 2010 07 05 00 24 55 31.3200 -97.3300 251.000 122.0 90.566 3.470 -999.990 -999.990 0.906 ..P WKT 2010 07 05 00 29 55 31.3200 -97.3300 251.000 457.0 81.239 2.320 -999.990 -999.990 0.812 ..P WKT 2010 07 05 00 34 55 31.3200 -97.3300 251.000 30.0 88.644 2.350 -999.990 -999.990 0.886 ..P WKT 2010 07 05 00 39 55 31.3200 -97.3300 251.000 122.0 92.178 3.280 -999.990 -999.990 0.922 ..P WKT 2010 07 05 00 44 55 31.3200 -97.3300 251.000 457.0 83.406 2.430 -999.990 -999.990 0.834 ..P WKT 2010 07 05 00 54 55 31.3200 -97.3300 251.000 30.0 88.232 2.880 -999.990 -999.990 0.882 ..P WKT 2010 07 05 00 59 55 31.3200 -97.3300 251.000 122.0 94.361 2.430 -999.990 -999.990 0.944 ..P WKT 2010 07 05 01 04 55 31.3200 -97.3300 251.000 457.0 81.141 3.010 -999.990 -999.990 0.811 ..P WKT 2010 07 05 01 09 55 31.3200 -97.3300 251.000 30.0 87.686 3.340 -999.990 -999.990 0.877 ..P WKT 2010 07 05 01 14 55 31.3200 -97.3300 251.000 122.0 84.555 4.280 -999.990 -999.990 0.846 ..P WKT 2010 07 05 01 19 55 31.3200 -97.3300 251.000 457.0 85.295 5.200 -999.990 -999.990 0.853 ..P WKT 2010 07 05 01 29 55 31.3200 -97.3300 251.000 30.0 84.918 4.850 -999.990 -999.990 0.849 ..P WKT 2010 07 05 01 34 55 31.3200 -97.3300 251.000 122.0 90.710 4.640 -999.990 -999.990 0.907 ..P WKT 2010 07 05 01 39 55 31.3200 -97.3300 251.000 457.0 89.041 3.580 -999.990 -999.990 0.890 ..P WKT 2010 07 05 01 44 55 31.3200 -97.3300 251.000 30.0 89.444 4.020 -999.990 -999.990 0.894 ..P WKT 2010 07 05 01 49 55 31.3200 -97.3300 251.000 122.0 92.886 4.960 -999.990 -999.990 0.929 ..P WKT 2010 07 05 01 54 55 31.3200 -97.3300 251.000 457.0 87.627 1.870 -999.990 -999.990 0.876 ..P WKT 2010 07 05 02 04 55 31.3200 -97.3300 251.000 30.0 80.641 3.090 -999.990 -999.990 0.806 ..P WKT 2010 07 05 02 09 55 31.3200 -97.3300 251.000 122.0 81.952 1.860 -999.990 -999.990 0.820 ..P WKT 2010 07 05 02 14 55 31.3200 -97.3300 251.000 457.0 88.786 1.680 -999.990 -999.990 0.888 ..P WKT 2010 07 05 02 19 55 31.3200 -97.3300 251.000 30.0 113.843 2.810 -999.990 -999.990 1.138 ..P WKT 2010 07 05 02 24 55 31.3200 -97.3300 251.000 122.0 84.504 1.900 -999.990 -999.990 0.845 ..P WKT 2010 07 05 02 29 55 31.3200 -97.3300 251.000 457.0 85.815 4.620 -999.990 -999.990 0.858 ..P WKT 2010 07 05 02 39 55 31.3200 -97.3300 251.000 30.0 89.461 5.160 -999.990 -999.990 0.895 ..P WKT 2010 07 05 02 44 55 31.3200 -97.3300 251.000 122.0 88.208 1.710 -999.990 -999.990 0.882 ..P WKT 2010 07 05 02 49 55 31.3200 -97.3300 251.000 457.0 89.439 1.590 -999.990 -999.990 0.894 ..P WKT 2010 07 05 02 54 55 31.3200 -97.3300 251.000 30.0 97.569 1.900 -999.990 -999.990 0.976 ..P WKT 2010 07 05 02 59 55 31.3200 -97.3300 251.000 122.0 87.209 2.000 -999.990 -999.990 0.872 ..P WKT 2010 07 05 03 04 55 31.3200 -97.3300 251.000 457.0 89.268 1.690 -999.990 -999.990 0.893 ..P WKT 2010 07 05 03 14 55 31.3200 -97.3300 251.000 30.0 94.586 3.340 -999.990 -999.990 0.946 ..P WKT 2010 07 05 03 19 55 31.3200 -97.3300 251.000 122.0 86.536 1.860 -999.990 -999.990 0.865 ..P WKT 2010 07 05 03 24 55 31.3200 -97.3300 251.000 457.0 82.072 2.740 -999.990 -999.990 0.821 ..P WKT 2010 07 05 03 29 55 31.3200 -97.3300 251.000 30.0 87.539 2.710 -999.990 -999.990 0.875 ..P WKT 2010 07 05 03 34 55 31.3200 -97.3300 251.000 122.0 89.418 2.500 -999.990 -999.990 0.894 ..P WKT 2010 07 05 03 39 55 31.3200 -97.3300 251.000 457.0 88.541 2.280 -999.990 -999.990 0.885 ..P WKT 2010 07 05 03 49 55 31.3200 -97.3300 251.000 30.0 87.535 1.790 -999.990 -999.990 0.875 ..P WKT 2010 07 05 03 54 55 31.3200 -97.3300 251.000 122.0 93.195 2.270 -999.990 -999.990 0.932 ..P WKT 2010 07 05 03 59 55 31.3200 -97.3300 251.000 457.0 99.408 3.410 -999.990 -999.990 0.994 ..P WKT 2010 07 05 04 04 55 31.3200 -97.3300 251.000 30.0 87.010 2.920 -999.990 -999.990 0.870 ..P WKT 2010 07 05 04 09 55 31.3200 -97.3300 251.000 122.0 88.259 2.760 -999.990 -999.990 0.883 ..P WKT 2010 07 05 04 14 55 31.3200 -97.3300 251.000 457.0 78.896 3.330 -999.990 -999.990 0.789 ..P WKT 2010 07 05 04 24 55 31.3200 -97.3300 251.000 30.0 97.125 2.570 -999.990 -999.990 0.971 ..P WKT 2010 07 05 04 29 55 31.3200 -97.3300 251.000 122.0 96.602 4.490 -999.990 -999.990 0.966 ..P WKT 2010 07 05 04 34 55 31.3200 -97.3300 251.000 457.0 81.060 3.070 -999.990 -999.990 0.811 ..P WKT 2010 07 05 04 39 55 31.3200 -97.3300 251.000 30.0 90.733 3.460 -999.990 -999.990 0.907 ..P WKT 2010 07 05 04 44 55 31.3200 -97.3300 251.000 122.0 89.660 2.440 -999.990 -999.990 0.897 ..P WKT 2010 07 05 04 49 55 31.3200 -97.3300 251.000 457.0 79.357 3.190 -999.990 -999.990 0.794 ..P WKT 2010 07 05 05 04 55 31.3200 -97.3300 251.000 30.0 92.271 3.360 -999.990 -999.990 0.923 ..P WKT 2010 07 05 05 09 55 31.3200 -97.3300 251.000 122.0 85.906 4.080 -999.990 -999.990 0.859 ..P WKT 2010 07 05 05 14 55 31.3200 -97.3300 251.000 457.0 69.628 3.730 -999.990 -999.990 0.696 ..P WKT 2010 07 05 05 19 55 31.3200 -97.3300 251.000 30.0 92.868 3.130 -999.990 -999.990 0.929 ..P WKT 2010 07 05 05 24 55 31.3200 -97.3300 251.000 122.0 85.402 3.090 -999.990 -999.990 0.854 ..P WKT 2010 07 05 05 29 55 31.3200 -97.3300 251.000 457.0 71.468 3.950 -999.990 -999.990 0.715 ..P WKT 2010 07 05 05 39 55 31.3200 -97.3300 251.000 30.0 83.660 3.440 -999.990 -999.990 0.837 ..P WKT 2010 07 05 05 44 55 31.3200 -97.3300 251.000 122.0 85.006 4.280 -999.990 -999.990 0.850 ..P WKT 2010 07 05 05 49 55 31.3200 -97.3300 251.000 457.0 71.627 3.590 -999.990 -999.990 0.716 ..P WKT 2010 07 05 05 54 55 31.3200 -97.3300 251.000 30.0 86.047 4.660 -999.990 -999.990 0.860 ..P WKT 2010 07 05 05 59 55 31.3200 -97.3300 251.000 122.0 84.503 5.140 -999.990 -999.990 0.845 ..P WKT 2010 07 05 06 04 55 31.3200 -97.3300 251.000 457.0 75.255 4.250 -999.990 -999.990 0.753 ..P WKT 2010 07 05 06 14 55 31.3200 -97.3300 251.000 30.0 86.496 4.440 -999.990 -999.990 0.865 ..P WKT 2010 07 05 06 19 55 31.3200 -97.3300 251.000 122.0 82.772 4.150 -999.990 -999.990 0.828 ..P WKT 2010 07 05 06 24 55 31.3200 -97.3300 251.000 457.0 72.445 4.460 -999.990 -999.990 0.724 ..P WKT 2010 07 05 06 29 55 31.3200 -97.3300 251.000 30.0 75.324 4.600 -999.990 -999.990 0.753 ..P WKT 2010 07 05 06 34 55 31.3200 -97.3300 251.000 122.0 83.978 5.910 -999.990 -999.990 0.840 ..P WKT 2010 07 05 06 39 55 31.3200 -97.3300 251.000 457.0 73.104 4.710 -999.990 -999.990 0.731 ..P WKT 2010 07 05 06 49 55 31.3200 -97.3300 251.000 30.0 77.485 3.860 -999.990 -999.990 0.775 ..P WKT 2010 07 05 06 54 55 31.3200 -97.3300 251.000 122.0 87.512 4.420 -999.990 -999.990 0.875 ..P WKT 2010 07 05 06 59 55 31.3200 -97.3300 251.000 457.0 68.667 4.940 -999.990 -999.990 0.687 ..P WKT 2010 07 05 07 04 55 31.3200 -97.3300 251.000 30.0 83.091 4.400 -999.990 -999.990 0.831 ..P WKT 2010 07 05 07 09 55 31.3200 -97.3300 251.000 122.0 85.967 3.350 -999.990 -999.990 0.860 ..P WKT 2010 07 05 07 14 55 31.3200 -97.3300 251.000 457.0 71.525 3.180 -999.990 -999.990 0.715 ..P WKT 2010 07 05 07 24 55 31.3200 -97.3300 251.000 30.0 79.634 2.860 -999.990 -999.990 0.796 ..P WKT 2010 07 05 07 29 55 31.3200 -97.3300 251.000 122.0 79.094 4.830 -999.990 -999.990 0.791 ..P WKT 2010 07 05 07 34 55 31.3200 -97.3300 251.000 457.0 68.661 3.410 -999.990 -999.990 0.687 ..P WKT 2010 07 05 07 39 55 31.3200 -97.3300 251.000 30.0 91.204 3.040 -999.990 -999.990 0.912 ..P WKT 2010 07 05 07 44 55 31.3200 -97.3300 251.000 122.0 89.427 3.320 -999.990 -999.990 0.894 ..P WKT 2010 07 05 07 49 55 31.3200 -97.3300 251.000 457.0 75.424 3.380 -999.990 -999.990 0.754 ..P WKT 2010 07 05 07 59 55 31.3200 -97.3300 251.000 30.0 88.492 3.600 -999.990 -999.990 0.885 ..P WKT 2010 07 05 08 04 55 31.3200 -97.3300 251.000 122.0 84.518 3.800 -999.990 -999.990 0.845 ..P WKT 2010 07 05 08 09 55 31.3200 -97.3300 251.000 457.0 74.227 3.470 -999.990 -999.990 0.742 ..P WKT 2010 07 05 08 14 55 31.3200 -97.3300 251.000 30.0 82.477 3.790 -999.990 -999.990 0.825 ..P WKT 2010 07 05 08 19 55 31.3200 -97.3300 251.000 122.0 86.056 4.170 -999.990 -999.990 0.861 ..P WKT 2010 07 05 08 24 55 31.3200 -97.3300 251.000 457.0 72.885 3.890 -999.990 -999.990 0.729 ..P WKT 2010 07 05 08 34 55 31.3200 -97.3300 251.000 30.0 80.494 3.250 -999.990 -999.990 0.805 ..P WKT 2010 07 05 08 39 55 31.3200 -97.3300 251.000 122.0 80.132 3.800 -999.990 -999.990 0.801 ..P WKT 2010 07 05 08 44 55 31.3200 -97.3300 251.000 457.0 75.651 4.340 -999.990 -999.990 0.757 ..P WKT 2010 07 05 08 49 55 31.3200 -97.3300 251.000 30.0 79.269 3.960 -999.990 -999.990 0.793 ..P WKT 2010 07 05 08 54 55 31.3200 -97.3300 251.000 122.0 81.376 4.170 -999.990 -999.990 0.814 ..P WKT 2010 07 05 08 59 55 31.3200 -97.3300 251.000 457.0 70.310 4.430 -999.990 -999.990 0.703 ..P WKT 2010 07 05 09 09 55 31.3200 -97.3300 251.000 30.0 78.935 5.050 -999.990 -999.990 0.789 ..P WKT 2010 07 05 09 14 55 31.3200 -97.3300 251.000 122.0 83.805 5.330 -999.990 -999.990 0.838 ..P WKT 2010 07 05 09 19 55 31.3200 -97.3300 251.000 457.0 72.350 5.380 -999.990 -999.990 0.723 ..P WKT 2010 07 05 09 24 55 31.3200 -97.3300 251.000 30.0 77.906 5.640 -999.990 -999.990 0.779 ..P WKT 2010 07 05 09 29 55 31.3200 -97.3300 251.000 122.0 77.152 6.140 -999.990 -999.990 0.772 ..P WKT 2010 07 05 09 34 55 31.3200 -97.3300 251.000 457.0 65.700 5.950 -999.990 -999.990 0.657 ..P WKT 2010 07 05 09 44 55 31.3200 -97.3300 251.000 30.0 83.156 5.680 -999.990 -999.990 0.832 ..P WKT 2010 07 05 09 49 55 31.3200 -97.3300 251.000 122.0 80.384 5.790 -999.990 -999.990 0.804 ..P WKT 2010 07 05 09 54 55 31.3200 -97.3300 251.000 457.0 65.822 5.390 -999.990 -999.990 0.658 ..P WKT 2010 07 05 09 59 55 31.3200 -97.3300 251.000 30.0 77.583 4.310 -999.990 -999.990 0.776 ..P WKT 2010 07 05 10 04 55 31.3200 -97.3300 251.000 122.0 78.102 4.330 -999.990 -999.990 0.781 ..P WKT 2010 07 05 10 09 55 31.3200 -97.3300 251.000 457.0 62.996 4.940 -999.990 -999.990 0.630 ..P WKT 2010 07 05 10 19 55 31.3200 -97.3300 251.000 30.0 83.261 3.700 -999.990 -999.990 0.833 ..P WKT 2010 07 05 10 24 55 31.3200 -97.3300 251.000 122.0 88.204 4.020 -999.990 -999.990 0.882 ..P WKT 2010 07 05 10 29 55 31.3200 -97.3300 251.000 457.0 76.155 3.880 -999.990 -999.990 0.762 ..P WKT 2010 07 05 10 34 55 31.3200 -97.3300 251.000 30.0 78.083 4.440 -999.990 -999.990 0.781 ..P WKT 2010 07 05 10 39 55 31.3200 -97.3300 251.000 122.0 83.847 4.370 -999.990 -999.990 0.838 ..P WKT 2010 07 05 10 44 55 31.3200 -97.3300 251.000 457.0 74.266 4.960 -999.990 -999.990 0.743 ..P WKT 2010 07 05 10 54 55 31.3200 -97.3300 251.000 30.0 80.157 4.190 -999.990 -999.990 0.802 ..P WKT 2010 07 05 10 59 55 31.3200 -97.3300 251.000 122.0 81.106 4.270 -999.990 -999.990 0.811 ..P WKT 2010 07 05 11 04 55 31.3200 -97.3300 251.000 457.0 72.742 5.360 -999.990 -999.990 0.727 ..P WKT 2010 07 05 11 09 55 31.3200 -97.3300 251.000 30.0 80.812 4.660 -999.990 -999.990 0.808 ..P WKT 2010 07 05 11 14 55 31.3200 -97.3300 251.000 122.0 85.047 5.260 -999.990 -999.990 0.850 ..P WKT 2010 07 05 11 19 55 31.3200 -97.3300 251.000 457.0 73.399 4.010 -999.990 -999.990 0.734 ..P WKT 2010 07 05 11 29 55 31.3200 -97.3300 251.000 30.0 83.389 3.670 -999.990 -999.990 0.834 ..P WKT 2010 07 05 11 34 55 31.3200 -97.3300 251.000 122.0 87.226 3.710 -999.990 -999.990 0.872 ..P WKT 2010 07 05 11 39 55 31.3200 -97.3300 251.000 457.0 78.744 4.260 -999.990 -999.990 0.787 ..P WKT 2010 07 05 11 44 55 31.3200 -97.3300 251.000 30.0 82.855 4.560 -999.990 -999.990 0.829 ..P WKT 2010 07 05 11 49 55 31.3200 -97.3300 251.000 122.0 84.091 4.190 -999.990 -999.990 0.841 ..P WKT 2010 07 05 12 09 55 31.3200 -97.3300 251.000 457.0 76.865 4.340 -999.990 -999.990 0.769 ..P WKT 2010 07 05 12 10 25 31.3200 -97.3300 251.000 457.0 79.291 4.690 -999.990 -999.990 0.793 ..P WKT 2010 07 05 12 10 55 31.3200 -97.3300 251.000 457.0 77.337 4.650 -999.990 -999.990 0.773 ..P WKT 2010 07 05 12 11 25 31.3200 -97.3300 251.000 457.0 71.825 5.580 -999.990 -999.990 0.718 ..P WKT 2010 07 05 12 11 55 31.3200 -97.3300 251.000 457.0 74.661 5.280 -999.990 -999.990 0.747 ..P WKT 2010 07 05 12 12 25 31.3200 -97.3300 251.000 457.0 77.772 3.960 -999.990 -999.990 0.778 ..P WKT 2010 07 05 12 12 55 31.3200 -97.3300 251.000 457.0 78.966 3.920 -999.990 -999.990 0.790 ..P WKT 2010 07 05 12 13 25 31.3200 -97.3300 251.000 457.0 76.738 4.390 -999.990 -999.990 0.767 ..P WKT 2010 07 05 12 13 55 31.3200 -97.3300 251.000 457.0 75.606 4.450 -999.990 -999.990 0.756 ..P WKT 2010 07 05 12 14 25 31.3200 -97.3300 251.000 457.0 77.073 4.130 -999.990 -999.990 0.771 ..P WKT 2010 07 05 12 14 55 31.3200 -97.3300 251.000 457.0 78.678 4.360 -999.990 -999.990 0.787 ..P WKT 2010 07 05 12 19 55 31.3200 -97.3300 251.000 30.0 82.546 4.840 -999.990 -999.990 0.825 ..P WKT 2010 07 05 12 24 55 31.3200 -97.3300 251.000 122.0 85.592 4.160 -999.990 -999.990 0.856 ..P WKT 2010 07 05 12 29 55 31.3200 -97.3300 251.000 457.0 80.561 3.870 -999.990 -999.990 0.806 ..P WKT 2010 07 05 12 34 55 31.3200 -97.3300 251.000 30.0 85.388 4.370 -999.990 -999.990 0.854 ..P WKT 2010 07 05 12 39 55 31.3200 -97.3300 251.000 122.0 89.806 4.280 -999.990 -999.990 0.898 ..P WKT 2010 07 05 12 44 55 31.3200 -97.3300 251.000 457.0 78.198 4.460 -999.990 -999.990 0.782 ..P WKT 2010 07 05 12 54 55 31.3200 -97.3300 251.000 30.0 77.756 4.240 -999.990 -999.990 0.778 ..P WKT 2010 07 05 12 59 55 31.3200 -97.3300 251.000 122.0 86.327 4.290 -999.990 -999.990 0.863 ..P WKT 2010 07 05 13 04 55 31.3200 -97.3300 251.000 457.0 72.969 4.890 -999.990 -999.990 0.730 ..P WKT 2010 07 05 13 09 55 31.3200 -97.3300 251.000 30.0 76.468 5.500 -999.990 -999.990 0.765 ..P WKT 2010 07 05 13 14 55 31.3200 -97.3300 251.000 122.0 79.557 5.050 -999.990 -999.990 0.796 ..P WKT 2010 07 05 13 19 55 31.3200 -97.3300 251.000 457.0 77.574 5.130 -999.990 -999.990 0.776 ..P WKT 2010 07 05 13 29 55 31.3200 -97.3300 251.000 30.0 78.034 5.350 -999.990 -999.990 0.780 ..P WKT 2010 07 05 13 34 55 31.3200 -97.3300 251.000 122.0 85.143 4.850 -999.990 -999.990 0.851 ..P WKT 2010 07 05 13 39 55 31.3200 -97.3300 251.000 457.0 78.945 5.260 -999.990 -999.990 0.789 ..P WKT 2010 07 05 13 44 55 31.3200 -97.3300 251.000 30.0 84.135 4.910 -999.990 -999.990 0.841 ..P WKT 2010 07 05 13 49 55 31.3200 -97.3300 251.000 122.0 86.581 5.140 -999.990 -999.990 0.866 ..P WKT 2010 07 05 13 54 55 31.3200 -97.3300 251.000 457.0 84.087 4.140 -999.990 -999.990 0.841 ..P WKT 2010 07 05 14 04 55 31.3200 -97.3300 251.000 30.0 84.961 4.280 -999.990 -999.990 0.850 ..P WKT 2010 07 05 14 09 55 31.3200 -97.3300 251.000 122.0 88.881 4.770 -999.990 -999.990 0.889 ..P WKT 2010 07 05 14 14 55 31.3200 -97.3300 251.000 457.0 81.814 4.730 -999.990 -999.990 0.818 ..P WKT 2010 07 05 14 19 55 31.3200 -97.3300 251.000 30.0 82.437 4.280 -999.990 -999.990 0.824 ..P WKT 2010 07 05 14 24 55 31.3200 -97.3300 251.000 122.0 89.105 4.180 -999.990 -999.990 0.891 ..P WKT 2010 07 05 14 29 55 31.3200 -97.3300 251.000 457.0 88.356 4.640 -999.990 -999.990 0.884 ..P WKT 2010 07 05 14 39 55 31.3200 -97.3300 251.000 30.0 88.191 3.670 -999.990 -999.990 0.882 ..P WKT 2010 07 05 14 44 55 31.3200 -97.3300 251.000 122.0 88.227 4.350 -999.990 -999.990 0.882 ..P WKT 2010 07 05 14 49 55 31.3200 -97.3300 251.000 457.0 82.764 3.510 -999.990 -999.990 0.828 ..P WKT 2010 07 05 14 54 55 31.3200 -97.3300 251.000 30.0 82.249 3.780 -999.990 -999.990 0.822 ..P WKT 2010 07 05 14 59 55 31.3200 -97.3300 251.000 122.0 86.958 3.270 -999.990 -999.990 0.870 ..P WKT 2010 07 05 15 04 55 31.3200 -97.3300 251.000 457.0 80.942 3.470 -999.990 -999.990 0.809 ..P WKT 2010 07 05 15 14 55 31.3200 -97.3300 251.000 30.0 84.766 3.390 -999.990 -999.990 0.848 ..P WKT 2010 07 05 15 19 55 31.3200 -97.3300 251.000 122.0 93.783 3.790 -999.990 -999.990 0.938 ..P WKT 2010 07 05 15 24 55 31.3200 -97.3300 251.000 457.0 84.914 3.930 -999.990 -999.990 0.849 ..P WKT 2010 07 05 15 29 55 31.3200 -97.3300 251.000 30.0 84.576 5.180 -999.990 -999.990 0.846 ..P WKT 2010 07 05 15 34 55 31.3200 -97.3300 251.000 122.0 88.092 5.790 -999.990 -999.990 0.881 ..P WKT 2010 07 05 15 39 55 31.3200 -97.3300 251.000 457.0 81.147 4.100 -999.990 -999.990 0.811 ..P WKT 2010 07 05 15 49 55 31.3200 -97.3300 251.000 30.0 87.609 3.690 -999.990 -999.990 0.876 ..P WKT 2010 07 05 15 54 55 31.3200 -97.3300 251.000 122.0 86.012 4.140 -999.990 -999.990 0.860 ..P WKT 2010 07 05 15 59 55 31.3200 -97.3300 251.000 457.0 81.108 5.080 -999.990 -999.990 0.811 ..P WKT 2010 07 05 16 04 55 31.3200 -97.3300 251.000 30.0 84.056 3.940 -999.990 -999.990 0.841 ..P WKT 2010 07 05 16 09 55 31.3200 -97.3300 251.000 122.0 88.932 4.010 -999.990 -999.990 0.889 ..P WKT 2010 07 05 16 14 55 31.3200 -97.3300 251.000 457.0 86.094 3.230 -999.990 -999.990 0.861 ..P WKT 2010 07 05 16 24 55 31.3200 -97.3300 251.000 30.0 89.316 2.820 -999.990 -999.990 0.893 ..P WKT 2010 07 05 16 29 55 31.3200 -97.3300 251.000 122.0 102.683 3.350 -999.990 -999.990 1.027 ..P WKT 2010 07 05 16 34 55 31.3200 -97.3300 251.000 457.0 90.136 4.930 -999.990 -999.990 0.901 ..P WKT 2010 07 05 16 39 55 31.3200 -97.3300 251.000 30.0 92.476 3.150 -999.990 -999.990 0.925 ..P WKT 2010 07 05 16 44 55 31.3200 -97.3300 251.000 122.0 97.989 3.500 -999.990 -999.990 0.980 ..P WKT 2010 07 05 16 49 55 31.3200 -97.3300 251.000 457.0 85.712 3.320 -999.990 -999.990 0.857 ..P WKT 2010 07 05 17 04 55 31.3200 -97.3300 251.000 30.0 84.434 2.670 -999.990 -999.990 0.844 ..P WKT 2010 07 05 17 09 55 31.3200 -97.3300 251.000 122.0 92.284 3.050 -999.990 -999.990 0.923 ..P WKT 2010 07 05 17 14 55 31.3200 -97.3300 251.000 457.0 83.849 5.070 -999.990 -999.990 0.838 ..P WKT 2010 07 05 17 19 55 31.3200 -97.3300 251.000 30.0 88.664 2.780 -999.990 -999.990 0.887 ..P WKT 2010 07 05 17 24 55 31.3200 -97.3300 251.000 122.0 96.379 3.020 -999.990 -999.990 0.964 ..P WKT 2010 07 05 17 29 55 31.3200 -97.3300 251.000 457.0 86.699 2.490 -999.990 -999.990 0.867 ..P WKT 2010 07 05 17 39 55 31.3200 -97.3300 251.000 30.0 92.480 3.260 -999.990 -999.990 0.925 ..P WKT 2010 07 05 17 44 55 31.3200 -97.3300 251.000 122.0 95.239 3.300 -999.990 -999.990 0.952 ..P WKT 2010 07 05 17 49 55 31.3200 -97.3300 251.000 457.0 83.356 3.790 -999.990 -999.990 0.834 ..P WKT 2010 07 05 17 54 55 31.3200 -97.3300 251.000 30.0 84.734 4.050 -999.990 -999.990 0.847 ..P WKT 2010 07 05 17 59 55 31.3200 -97.3300 251.000 122.0 98.825 4.580 -999.990 -999.990 0.988 ..P WKT 2010 07 05 18 04 55 31.3200 -97.3300 251.000 457.0 77.815 5.110 -999.990 -999.990 0.778 ..P WKT 2010 07 05 18 14 55 31.3200 -97.3300 251.000 30.0 83.296 5.290 -999.990 -999.990 0.833 ..P WKT 2010 07 05 18 19 55 31.3200 -97.3300 251.000 122.0 86.017 4.800 -999.990 -999.990 0.860 ..P WKT 2010 07 05 18 24 55 31.3200 -97.3300 251.000 457.0 83.208 4.360 -999.990 -999.990 0.832 ..P WKT 2010 07 05 18 29 55 31.3200 -97.3300 251.000 30.0 85.930 4.460 -999.990 -999.990 0.859 ..P WKT 2010 07 05 18 34 55 31.3200 -97.3300 251.000 122.0 97.506 4.760 -999.990 -999.990 0.975 ..P WKT 2010 07 05 18 39 55 31.3200 -97.3300 251.000 457.0 87.227 3.950 -999.990 -999.990 0.872 ..P WKT 2010 07 05 18 49 55 31.3200 -97.3300 251.000 30.0 86.626 4.510 -999.990 -999.990 0.866 ..P WKT 2010 07 05 18 54 55 31.3200 -97.3300 251.000 122.0 96.034 4.250 -999.990 -999.990 0.960 ..P WKT 2010 07 05 18 59 55 31.3200 -97.3300 251.000 457.0 85.235 3.590 -999.990 -999.990 0.852 ..P WKT 2010 07 05 19 04 55 31.3200 -97.3300 251.000 30.0 87.723 3.480 -999.990 -999.990 0.877 ..P WKT 2010 07 05 19 09 55 31.3200 -97.3300 251.000 122.0 99.072 2.440 -999.990 -999.990 0.991 ..P WKT 2010 07 05 19 14 55 31.3200 -97.3300 251.000 457.0 83.839 2.230 -999.990 -999.990 0.838 ..P WKT 2010 07 05 19 24 55 31.3200 -97.3300 251.000 30.0 85.473 2.020 -999.990 -999.990 0.855 ..P WKT 2010 07 05 19 29 55 31.3200 -97.3300 251.000 122.0 94.315 1.890 -999.990 -999.990 0.943 ..P WKT 2010 07 05 19 34 55 31.3200 -97.3300 251.000 457.0 81.685 2.150 -999.990 -999.990 0.817 ..P WKT 2010 07 05 19 39 55 31.3200 -97.3300 251.000 30.0 86.510 2.310 -999.990 -999.990 0.865 ..P WKT 2010 07 05 19 44 55 31.3200 -97.3300 251.000 122.0 93.277 2.440 -999.990 -999.990 0.933 ..P WKT 2010 07 05 19 49 55 31.3200 -97.3300 251.000 457.0 80.780 3.460 -999.990 -999.990 0.808 ..P WKT 2010 07 05 19 59 55 31.3200 -97.3300 251.000 30.0 79.424 3.380 -999.990 -999.990 0.794 ..P WKT 2010 07 05 20 04 55 31.3200 -97.3300 251.000 122.0 87.244 3.000 -999.990 -999.990 0.872 ..P WKT 2010 07 05 20 09 55 31.3200 -97.3300 251.000 457.0 82.447 3.970 -999.990 -999.990 0.824 ..P WKT 2010 07 05 20 14 55 31.3200 -97.3300 251.000 30.0 85.137 2.710 -999.990 -999.990 0.851 ..P WKT 2010 07 05 20 19 55 31.3200 -97.3300 251.000 122.0 82.973 2.900 -999.990 -999.990 0.830 ..P WKT 2010 07 05 20 24 55 31.3200 -97.3300 251.000 457.0 83.583 2.840 -999.990 -999.990 0.836 ..P WKT 2010 07 05 20 34 55 31.3200 -97.3300 251.000 30.0 85.379 3.530 -999.990 -999.990 0.854 ..P WKT 2010 07 05 20 39 55 31.3200 -97.3300 251.000 122.0 94.754 3.930 -999.990 -999.990 0.948 ..P WKT 2010 07 05 20 44 55 31.3200 -97.3300 251.000 457.0 86.224 3.890 -999.990 -999.990 0.862 ..P WKT 2010 07 05 20 49 55 31.3200 -97.3300 251.000 30.0 88.521 3.860 -999.990 -999.990 0.885 ..P WKT 2010 07 05 20 54 55 31.3200 -97.3300 251.000 122.0 92.485 3.310 -999.990 -999.990 0.925 ..P WKT 2010 07 05 20 59 55 31.3200 -97.3300 251.000 457.0 86.728 3.040 -999.990 -999.990 0.867 ..P WKT 2010 07 05 21 09 55 31.3200 -97.3300 251.000 30.0 81.483 3.790 -999.990 -999.990 0.815 ..P WKT 2010 07 05 21 14 55 31.3200 -97.3300 251.000 122.0 90.746 2.990 -999.990 -999.990 0.907 ..P WKT 2010 07 05 21 19 55 31.3200 -97.3300 251.000 457.0 82.645 3.390 -999.990 -999.990 0.826 ..P WKT 2010 07 05 21 24 55 31.3200 -97.3300 251.000 30.0 90.800 3.870 -999.990 -999.990 0.908 ..P WKT 2010 07 05 21 29 55 31.3200 -97.3300 251.000 122.0 91.174 3.460 -999.990 -999.990 0.912 ..P WKT 2010 07 05 21 34 55 31.3200 -97.3300 251.000 457.0 86.822 4.090 -999.990 -999.990 0.868 ..P WKT 2010 07 05 21 44 55 31.3200 -97.3300 251.000 30.0 85.187 4.370 -999.990 -999.990 0.852 ..P WKT 2010 07 05 21 49 55 31.3200 -97.3300 251.000 122.0 85.262 3.340 -999.990 -999.990 0.853 ..P WKT 2010 07 05 21 54 55 31.3200 -97.3300 251.000 457.0 81.165 3.780 -999.990 -999.990 0.812 ..P WKT 2010 07 05 21 59 55 31.3200 -97.3300 251.000 30.0 85.692 3.060 -999.990 -999.990 0.857 ..P WKT 2010 07 05 22 04 55 31.3200 -97.3300 251.000 122.0 96.897 4.450 -999.990 -999.990 0.969 ..P WKT 2010 07 05 22 09 55 31.3200 -97.3300 251.000 457.0 86.678 3.350 -999.990 -999.990 0.867 ..P WKT 2010 07 05 22 19 55 31.3200 -97.3300 251.000 30.0 89.872 3.940 -999.990 -999.990 0.899 ..P WKT 2010 07 05 22 24 55 31.3200 -97.3300 251.000 122.0 89.093 2.390 -999.990 -999.990 0.891 ..P WKT 2010 07 05 22 29 55 31.3200 -97.3300 251.000 457.0 84.695 4.820 -999.990 -999.990 0.847 ..P WKT 2010 07 05 22 34 55 31.3200 -97.3300 251.000 30.0 87.535 2.000 -999.990 -999.990 0.875 ..P WKT 2010 07 05 22 39 55 31.3200 -97.3300 251.000 122.0 99.845 2.720 -999.990 -999.990 0.998 ..P WKT 2010 07 05 22 44 55 31.3200 -97.3300 251.000 457.0 88.066 2.760 -999.990 -999.990 0.881 ..P WKT 2010 07 05 22 54 55 31.3200 -97.3300 251.000 30.0 83.024 2.080 -999.990 -999.990 0.830 ..P WKT 2010 07 05 22 59 55 31.3200 -97.3300 251.000 122.0 95.200 2.780 -999.990 -999.990 0.952 ..P WKT 2010 07 05 23 04 55 31.3200 -97.3300 251.000 457.0 87.176 3.830 -999.990 -999.990 0.872 ..P WKT 2010 07 05 23 09 55 31.3200 -97.3300 251.000 30.0 84.585 2.370 -999.990 -999.990 0.846 ..P WKT 2010 07 05 23 14 55 31.3200 -97.3300 251.000 122.0 94.396 5.280 -999.990 -999.990 0.944 ..P WKT 2010 07 05 23 19 55 31.3200 -97.3300 251.000 457.0 90.690 2.560 -999.990 -999.990 0.907 ..P WKT 2010 07 05 23 29 55 31.3200 -97.3300 251.000 30.0 89.441 2.740 -999.990 -999.990 0.894 ..P WKT 2010 07 05 23 34 55 31.3200 -97.3300 251.000 122.0 98.873 3.330 -999.990 -999.990 0.989 ..P WKT 2010 07 05 23 39 55 31.3200 -97.3300 251.000 457.0 94.501 2.750 -999.990 -999.990 0.945 ..P WKT 2010 07 05 23 44 55 31.3200 -97.3300 251.000 30.0 87.616 2.740 -999.990 -999.990 0.876 ..P WKT 2010 07 05 23 49 55 31.3200 -97.3300 251.000 122.0 97.470 1.810 -999.990 -999.990 0.975 ..P WKT 2010 07 06 00 09 55 31.3200 -97.3300 251.000 457.0 86.271 1.870 -999.990 -999.990 0.863 ..P WKT 2010 07 06 00 10 25 31.3200 -97.3300 251.000 457.0 90.752 2.170 -999.990 -999.990 0.908 ..P WKT 2010 07 06 00 10 55 31.3200 -97.3300 251.000 457.0 92.583 1.700 -999.990 -999.990 0.926 ..P WKT 2010 07 06 00 11 25 31.3200 -97.3300 251.000 457.0 93.715 2.180 -999.990 -999.990 0.937 ..P WKT 2010 07 06 00 11 55 31.3200 -97.3300 251.000 457.0 95.964 2.460 -999.990 -999.990 0.960 ..P WKT 2010 07 06 00 12 25 31.3200 -97.3300 251.000 457.0 93.190 2.530 -999.990 -999.990 0.932 ..P WKT 2010 07 06 00 12 55 31.3200 -97.3300 251.000 457.0 99.346 3.530 -999.990 -999.990 0.993 ..P WKT 2010 07 06 00 13 25 31.3200 -97.3300 251.000 457.0 93.362 4.530 -999.990 -999.990 0.934 ..P WKT 2010 07 06 00 13 55 31.3200 -97.3300 251.000 457.0 90.866 2.450 -999.990 -999.990 0.909 ..P WKT 2010 07 06 00 14 25 31.3200 -97.3300 251.000 457.0 92.278 2.830 -999.990 -999.990 0.923 ..P WKT 2010 07 06 00 14 55 31.3200 -97.3300 251.000 457.0 91.736 1.930 -999.990 -999.990 0.917 ..P WKT 2010 07 06 00 19 55 31.3200 -97.3300 251.000 30.0 89.108 1.810 -999.990 -999.990 0.891 ..P WKT 2010 07 06 00 24 55 31.3200 -97.3300 251.000 122.0 100.433 1.920 -999.990 -999.990 1.004 ..P WKT 2010 07 06 00 29 55 31.3200 -97.3300 251.000 457.0 91.526 2.330 -999.990 -999.990 0.915 ..P WKT 2010 07 06 00 34 55 31.3200 -97.3300 251.000 30.0 93.084 3.600 -999.990 -999.990 0.931 ..P WKT 2010 07 06 00 39 55 31.3200 -97.3300 251.000 122.0 98.270 2.610 -999.990 -999.990 0.983 ..P WKT 2010 07 06 00 44 55 31.3200 -97.3300 251.000 457.0 96.060 3.610 -999.990 -999.990 0.961 ..P WKT 2010 07 06 00 54 55 31.3200 -97.3300 251.000 30.0 98.104 4.380 -999.990 -999.990 0.981 ..P WKT 2010 07 06 00 59 55 31.3200 -97.3300 251.000 122.0 98.590 3.400 -999.990 -999.990 0.986 ..P WKT 2010 07 06 01 04 55 31.3200 -97.3300 251.000 457.0 90.146 4.860 -999.990 -999.990 0.901 ..P WKT 2010 07 06 01 09 55 31.3200 -97.3300 251.000 30.0 97.887 2.790 -999.990 -999.990 0.979 ..P WKT 2010 07 06 01 14 55 31.3200 -97.3300 251.000 122.0 101.721 2.980 -999.990 -999.990 1.017 ..P WKT 2010 07 06 01 19 55 31.3200 -97.3300 251.000 457.0 101.648 4.190 -999.990 -999.990 1.016 ..P WKT 2010 07 06 01 29 55 31.3200 -97.3300 251.000 30.0 103.896 3.210 -999.990 -999.990 1.039 ..P WKT 2010 07 06 01 34 55 31.3200 -97.3300 251.000 122.0 95.891 4.370 -999.990 -999.990 0.959 ..P WKT 2010 07 06 01 39 55 31.3200 -97.3300 251.000 457.0 95.141 3.410 -999.990 -999.990 0.951 ..P WKT 2010 07 06 01 44 55 31.3200 -97.3300 251.000 30.0 101.646 4.680 -999.990 -999.990 1.016 ..P WKT 2010 07 06 01 49 55 31.3200 -97.3300 251.000 122.0 94.199 4.260 -999.990 -999.990 0.942 ..P WKT 2010 07 06 01 54 55 31.3200 -97.3300 251.000 457.0 97.634 2.410 -999.990 -999.990 0.976 ..P WKT 2010 07 06 02 04 55 31.3200 -97.3300 251.000 30.0 98.646 2.660 -999.990 -999.990 0.986 ..P WKT 2010 07 06 02 09 55 31.3200 -97.3300 251.000 122.0 91.758 3.970 -999.990 -999.990 0.918 ..P WKT 2010 07 06 02 14 55 31.3200 -97.3300 251.000 457.0 91.845 4.550 -999.990 -999.990 0.918 ..P WKT 2010 07 06 02 19 55 31.3200 -97.3300 251.000 30.0 91.375 6.260 -999.990 -999.990 0.914 ..P WKT 2010 07 06 02 24 55 31.3200 -97.3300 251.000 122.0 90.904 4.280 -999.990 -999.990 0.909 ..P WKT 2010 07 06 02 29 55 31.3200 -97.3300 251.000 457.0 85.133 2.590 -999.990 -999.990 0.851 ..P WKT 2010 07 06 02 39 55 31.3200 -97.3300 251.000 30.0 88.058 2.990 -999.990 -999.990 0.881 ..P WKT 2010 07 06 02 44 55 31.3200 -97.3300 251.000 122.0 84.897 3.780 -999.990 -999.990 0.849 ..P WKT 2010 07 06 02 49 55 31.3200 -97.3300 251.000 457.0 88.989 5.070 -999.990 -999.990 0.890 ..P WKT 2010 07 06 02 54 55 31.3200 -97.3300 251.000 30.0 88.897 3.540 -999.990 -999.990 0.889 ..P WKT 2010 07 06 02 59 55 31.3200 -97.3300 251.000 122.0 90.060 3.660 -999.990 -999.990 0.901 ..P WKT 2010 07 06 03 04 55 31.3200 -97.3300 251.000 457.0 79.369 4.960 -999.990 -999.990 0.794 ..P WKT 2010 07 06 03 14 55 31.3200 -97.3300 251.000 30.0 92.215 4.200 -999.990 -999.990 0.922 ..P WKT 2010 07 06 03 19 55 31.3200 -97.3300 251.000 122.0 93.716 2.730 -999.990 -999.990 0.937 ..P WKT 2010 07 06 03 24 55 31.3200 -97.3300 251.000 457.0 96.194 2.730 -999.990 -999.990 0.962 ..P WKT 2010 07 06 03 29 55 31.3200 -97.3300 251.000 30.0 95.325 3.990 -999.990 -999.990 0.953 ..P WKT 2010 07 06 03 34 55 31.3200 -97.3300 251.000 122.0 97.943 3.450 -999.990 -999.990 0.979 ..P WKT 2010 07 06 03 39 55 31.3200 -97.3300 251.000 457.0 91.914 1.860 -999.990 -999.990 0.919 ..P WKT 2010 07 06 03 49 55 31.3200 -97.3300 251.000 30.0 92.148 2.220 -999.990 -999.990 0.921 ..P WKT 2010 07 06 03 54 55 31.3200 -97.3300 251.000 122.0 91.996 2.310 -999.990 -999.990 0.920 ..P WKT 2010 07 06 03 59 55 31.3200 -97.3300 251.000 457.0 92.821 2.380 -999.990 -999.990 0.928 ..P WKT 2010 07 06 04 04 55 31.3200 -97.3300 251.000 30.0 87.649 2.510 -999.990 -999.990 0.876 ..P WKT 2010 07 06 04 09 55 31.3200 -97.3300 251.000 122.0 91.820 3.850 -999.990 -999.990 0.918 ..P WKT 2010 07 06 04 14 55 31.3200 -97.3300 251.000 457.0 103.240 2.730 -999.990 -999.990 1.032 ..P WKT 2010 07 06 04 24 55 31.3200 -97.3300 251.000 30.0 100.546 3.860 -999.990 -999.990 1.005 ..P WKT 2010 07 06 04 29 55 31.3200 -97.3300 251.000 122.0 95.913 2.860 -999.990 -999.990 0.959 ..P WKT 2010 07 06 04 34 55 31.3200 -97.3300 251.000 457.0 99.644 3.020 -999.990 -999.990 0.996 ..P WKT 2010 07 06 04 39 55 31.3200 -97.3300 251.000 30.0 95.569 2.660 -999.990 -999.990 0.956 ..P WKT 2010 07 06 04 44 55 31.3200 -97.3300 251.000 122.0 98.046 3.040 -999.990 -999.990 0.980 ..P WKT 2010 07 06 04 49 55 31.3200 -97.3300 251.000 457.0 88.534 4.740 -999.990 -999.990 0.885 ..P WKT 2010 07 06 05 04 55 31.3200 -97.3300 251.000 30.0 82.801 2.450 -999.990 -999.990 0.828 ..P WKT 2010 07 06 05 09 55 31.3200 -97.3300 251.000 122.0 106.019 3.120 -999.990 -999.990 1.060 ..P WKT 2010 07 06 05 14 55 31.3200 -97.3300 251.000 457.0 92.435 3.070 -999.990 -999.990 0.924 ..P WKT 2010 07 06 05 19 55 31.3200 -97.3300 251.000 30.0 95.022 3.180 -999.990 -999.990 0.950 ..P WKT 2010 07 06 05 24 55 31.3200 -97.3300 251.000 122.0 100.117 3.210 -999.990 -999.990 1.001 ..P WKT 2010 07 06 05 29 55 31.3200 -97.3300 251.000 457.0 84.582 2.520 -999.990 -999.990 0.846 ..P WKT 2010 07 06 05 39 55 31.3200 -97.3300 251.000 30.0 89.088 2.520 -999.990 -999.990 0.891 ..P WKT 2010 07 06 05 44 55 31.3200 -97.3300 251.000 122.0 102.994 2.540 -999.990 -999.990 1.030 ..P WKT 2010 07 06 05 49 55 31.3200 -97.3300 251.000 457.0 94.877 2.660 -999.990 -999.990 0.949 ..P WKT 2010 07 06 05 54 55 31.3200 -97.3300 251.000 30.0 94.566 2.250 -999.990 -999.990 0.946 ..P WKT 2010 07 06 05 59 55 31.3200 -97.3300 251.000 122.0 119.900 2.920 -999.990 -999.990 1.199 ..P WKT 2010 07 06 06 04 55 31.3200 -97.3300 251.000 457.0 93.387 2.570 -999.990 -999.990 0.934 ..P WKT 2010 07 06 06 14 55 31.3200 -97.3300 251.000 30.0 97.603 2.440 -999.990 -999.990 0.976 ..P WKT 2010 07 06 06 19 55 31.3200 -97.3300 251.000 122.0 102.129 3.440 -999.990 -999.990 1.021 ..P WKT 2010 07 06 06 24 55 31.3200 -97.3300 251.000 457.0 89.654 1.820 -999.990 -999.990 0.897 ..P WKT 2010 07 06 06 29 55 31.3200 -97.3300 251.000 30.0 100.591 1.910 -999.990 -999.990 1.006 ..P WKT 2010 07 06 06 34 55 31.3200 -97.3300 251.000 122.0 98.986 3.280 -999.990 -999.990 0.990 ..P WKT 2010 07 06 06 39 55 31.3200 -97.3300 251.000 457.0 99.611 2.130 -999.990 -999.990 0.996 ..P WKT 2010 07 06 06 49 55 31.3200 -97.3300 251.000 30.0 101.875 2.370 -999.990 -999.990 1.019 ..P WKT 2010 07 06 06 54 55 31.3200 -97.3300 251.000 122.0 105.048 3.540 -999.990 -999.990 1.050 ..P WKT 2010 07 06 06 59 55 31.3200 -97.3300 251.000 457.0 109.056 3.000 -999.990 -999.990 1.091 ..P WKT 2010 07 06 07 04 55 31.3200 -97.3300 251.000 30.0 98.016 2.370 -999.990 -999.990 0.980 ..P WKT 2010 07 06 07 09 55 31.3200 -97.3300 251.000 122.0 101.328 2.910 -999.990 -999.990 1.013 ..P WKT 2010 07 06 07 14 55 31.3200 -97.3300 251.000 457.0 108.122 3.340 -999.990 -999.990 1.081 ..P WKT 2010 07 06 07 24 55 31.3200 -97.3300 251.000 30.0 105.091 2.580 -999.990 -999.990 1.051 ..P WKT 2010 07 06 07 29 55 31.3200 -97.3300 251.000 122.0 107.527 2.350 -999.990 -999.990 1.075 ..P WKT 2010 07 06 07 34 55 31.3200 -97.3300 251.000 457.0 115.396 2.690 -999.990 -999.990 1.154 ..P WKT 2010 07 06 07 39 55 31.3200 -97.3300 251.000 30.0 99.023 4.210 -999.990 -999.990 0.990 ..P WKT 2010 07 06 07 44 55 31.3200 -97.3300 251.000 122.0 103.827 3.000 -999.990 -999.990 1.038 ..P WKT 2010 07 06 07 49 55 31.3200 -97.3300 251.000 457.0 119.080 4.300 -999.990 -999.990 1.191 ..P WKT 2010 07 06 07 59 55 31.3200 -97.3300 251.000 30.0 106.894 3.370 -999.990 -999.990 1.069 ..P WKT 2010 07 06 08 04 55 31.3200 -97.3300 251.000 122.0 85.447 3.380 -999.990 -999.990 0.854 ..P WKT 2010 07 06 08 09 55 31.3200 -97.3300 251.000 457.0 119.028 3.430 -999.990 -999.990 1.190 ..P WKT 2010 07 06 08 14 55 31.3200 -97.3300 251.000 30.0 97.164 2.900 -999.990 -999.990 0.972 ..P WKT 2010 07 06 08 19 55 31.3200 -97.3300 251.000 122.0 103.579 2.910 -999.990 -999.990 1.036 ..P WKT 2010 07 06 08 24 55 31.3200 -97.3300 251.000 457.0 84.641 3.970 -999.990 -999.990 0.846 ..P WKT 2010 07 06 08 34 55 31.3200 -97.3300 251.000 30.0 98.666 2.690 -999.990 -999.990 0.987 ..P WKT 2010 07 06 08 39 55 31.3200 -97.3300 251.000 122.0 111.847 3.050 -999.990 -999.990 1.118 ..P WKT 2010 07 06 08 44 55 31.3200 -97.3300 251.000 457.0 90.204 2.780 -999.990 -999.990 0.902 ..P WKT 2010 07 06 08 49 55 31.3200 -97.3300 251.000 30.0 103.942 4.540 -999.990 -999.990 1.039 ..P WKT 2010 07 06 08 54 55 31.3200 -97.3300 251.000 122.0 103.751 2.600 -999.990 -999.990 1.038 ..P WKT 2010 07 06 08 59 55 31.3200 -97.3300 251.000 457.0 84.338 2.560 -999.990 -999.990 0.843 ..P WKT 2010 07 06 09 09 55 31.3200 -97.3300 251.000 30.0 98.162 2.660 -999.990 -999.990 0.982 ..P WKT 2010 07 06 09 14 55 31.3200 -97.3300 251.000 122.0 91.006 3.240 -999.990 -999.990 0.910 ..P WKT 2010 07 06 09 19 55 31.3200 -97.3300 251.000 457.0 82.179 3.090 -999.990 -999.990 0.822 ..P WKT 2010 07 06 09 24 55 31.3200 -97.3300 251.000 30.0 102.879 2.980 -999.990 -999.990 1.029 ..P WKT 2010 07 06 09 29 55 31.3200 -97.3300 251.000 122.0 99.345 3.080 -999.990 -999.990 0.993 ..P WKT 2010 07 06 09 34 55 31.3200 -97.3300 251.000 457.0 89.962 3.060 -999.990 -999.990 0.900 ..P WKT 2010 07 06 09 44 55 31.3200 -97.3300 251.000 30.0 104.182 3.520 -999.990 -999.990 1.042 ..P WKT 2010 07 06 09 49 55 31.3200 -97.3300 251.000 122.0 97.982 3.460 -999.990 -999.990 0.980 ..P WKT 2010 07 06 09 54 55 31.3200 -97.3300 251.000 457.0 94.846 2.960 -999.990 -999.990 0.948 ..P WKT 2010 07 06 09 59 55 31.3200 -97.3300 251.000 30.0 99.787 3.690 -999.990 -999.990 0.998 ..P WKT 2010 07 06 10 04 55 31.3200 -97.3300 251.000 122.0 103.615 4.300 -999.990 -999.990 1.036 ..P WKT 2010 07 06 10 09 55 31.3200 -97.3300 251.000 457.0 84.883 2.570 -999.990 -999.990 0.849 ..P WKT 2010 07 06 10 19 55 31.3200 -97.3300 251.000 30.0 103.537 2.560 -999.990 -999.990 1.035 ..P WKT 2010 07 06 10 24 55 31.3200 -97.3300 251.000 122.0 108.617 3.150 -999.990 -999.990 1.086 ..P WKT 2010 07 06 10 29 55 31.3200 -97.3300 251.000 457.0 90.582 3.410 -999.990 -999.990 0.906 ..P WKT 2010 07 06 10 34 55 31.3200 -97.3300 251.000 30.0 99.840 3.430 -999.990 -999.990 0.998 ..P WKT 2010 07 06 10 39 55 31.3200 -97.3300 251.000 122.0 107.286 2.170 -999.990 -999.990 1.073 ..P WKT 2010 07 06 10 44 55 31.3200 -97.3300 251.000 457.0 94.125 2.360 -999.990 -999.990 0.941 ..P WKT 2010 07 06 10 54 55 31.3200 -97.3300 251.000 30.0 106.034 3.100 -999.990 -999.990 1.060 ..P WKT 2010 07 06 10 59 55 31.3200 -97.3300 251.000 122.0 99.359 2.300 -999.990 -999.990 0.994 ..P WKT 2010 07 06 11 04 55 31.3200 -97.3300 251.000 457.0 92.266 3.470 -999.990 -999.990 0.923 ..P WKT 2010 07 06 11 09 55 31.3200 -97.3300 251.000 30.0 98.538 2.650 -999.990 -999.990 0.985 ..P WKT 2010 07 06 11 14 55 31.3200 -97.3300 251.000 122.0 101.052 3.180 -999.990 -999.990 1.011 ..P WKT 2010 07 06 11 19 55 31.3200 -97.3300 251.000 457.0 99.806 3.830 -999.990 -999.990 0.998 ..P WKT 2010 07 06 11 29 55 31.3200 -97.3300 251.000 30.0 104.102 5.100 -999.990 -999.990 1.041 ..P WKT 2010 07 06 11 34 55 31.3200 -97.3300 251.000 122.0 96.419 3.990 -999.990 -999.990 0.964 ..P WKT 2010 07 06 11 39 55 31.3200 -97.3300 251.000 457.0 101.402 3.380 -999.990 -999.990 1.014 ..P WKT 2010 07 06 11 44 55 31.3200 -97.3300 251.000 30.0 102.210 3.890 -999.990 -999.990 1.022 ..P WKT 2010 07 06 11 49 55 31.3200 -97.3300 251.000 122.0 91.186 3.060 -999.990 -999.990 0.912 ..P WKT 2010 07 06 12 09 55 31.3200 -97.3300 251.000 457.0 85.860 3.810 -999.990 -999.990 0.859 ..P WKT 2010 07 06 12 10 25 31.3200 -97.3300 251.000 457.0 78.448 3.530 -999.990 -999.990 0.784 ..P WKT 2010 07 06 12 10 55 31.3200 -97.3300 251.000 457.0 83.151 4.190 -999.990 -999.990 0.832 ..P WKT 2010 07 06 12 11 25 31.3200 -97.3300 251.000 457.0 80.474 3.170 -999.990 -999.990 0.805 ..P WKT 2010 07 06 12 11 55 31.3200 -97.3300 251.000 457.0 77.658 2.740 -999.990 -999.990 0.777 ..P WKT 2010 07 06 12 12 25 31.3200 -97.3300 251.000 457.0 79.854 3.420 -999.990 -999.990 0.799 ..P WKT 2010 07 06 12 12 55 31.3200 -97.3300 251.000 457.0 83.443 3.820 -999.990 -999.990 0.834 ..P WKT 2010 07 06 12 13 25 31.3200 -97.3300 251.000 457.0 81.462 2.910 -999.990 -999.990 0.815 ..P WKT 2010 07 06 12 13 55 31.3200 -97.3300 251.000 457.0 79.063 3.160 -999.990 -999.990 0.791 ..P WKT 2010 07 06 12 14 25 31.3200 -97.3300 251.000 457.0 83.209 3.320 -999.990 -999.990 0.832 ..P WKT 2010 07 06 12 14 55 31.3200 -97.3300 251.000 457.0 81.646 3.300 -999.990 -999.990 0.816 ..P WKT 2010 07 06 12 19 55 31.3200 -97.3300 251.000 30.0 110.437 3.400 -999.990 -999.990 1.104 ..P WKT 2010 07 06 12 24 55 31.3200 -97.3300 251.000 122.0 100.655 2.920 -999.990 -999.990 1.007 ..P WKT 2010 07 06 12 29 55 31.3200 -97.3300 251.000 457.0 79.587 3.020 -999.990 -999.990 0.796 ..P WKT 2010 07 06 12 34 55 31.3200 -97.3300 251.000 30.0 104.904 2.790 -999.990 -999.990 1.049 ..P WKT 2010 07 06 12 39 55 31.3200 -97.3300 251.000 122.0 97.068 2.940 -999.990 -999.990 0.971 ..P WKT 2010 07 06 12 44 55 31.3200 -97.3300 251.000 457.0 83.100 2.960 -999.990 -999.990 0.831 ..P WKT 2010 07 06 12 54 55 31.3200 -97.3300 251.000 30.0 109.524 4.260 -999.990 -999.990 1.095 ..P WKT 2010 07 06 12 59 55 31.3200 -97.3300 251.000 122.0 86.088 2.680 -999.990 -999.990 0.861 ..P WKT 2010 07 06 13 04 55 31.3200 -97.3300 251.000 457.0 90.529 4.050 -999.990 -999.990 0.905 ..P WKT 2010 07 06 13 09 55 31.3200 -97.3300 251.000 30.0 109.749 2.750 -999.990 -999.990 1.097 ..P WKT 2010 07 06 13 14 55 31.3200 -97.3300 251.000 122.0 85.470 2.900 -999.990 -999.990 0.855 ..P WKT 2010 07 06 13 19 55 31.3200 -97.3300 251.000 457.0 88.795 2.710 -999.990 -999.990 0.888 ..P WKT 2010 07 06 13 29 55 31.3200 -97.3300 251.000 30.0 114.938 3.670 -999.990 -999.990 1.149 ..P WKT 2010 07 06 13 34 55 31.3200 -97.3300 251.000 122.0 85.865 2.170 -999.990 -999.990 0.859 ..P WKT 2010 07 06 13 39 55 31.3200 -97.3300 251.000 457.0 100.036 2.930 -999.990 -999.990 1.000 ..P WKT 2010 07 06 13 44 55 31.3200 -97.3300 251.000 30.0 91.605 1.860 -999.990 -999.990 0.916 ..P WKT 2010 07 06 13 49 55 31.3200 -97.3300 251.000 122.0 96.569 1.790 -999.990 -999.990 0.966 ..P WKT 2010 07 06 13 54 55 31.3200 -97.3300 251.000 457.0 86.463 1.870 -999.990 -999.990 0.865 ..P WKT 2010 07 06 14 04 55 31.3200 -97.3300 251.000 30.0 94.199 1.970 -999.990 -999.990 0.942 ..P WKT 2010 07 06 14 09 55 31.3200 -97.3300 251.000 122.0 100.321 5.480 -999.990 -999.990 1.003 ..P WKT 2010 07 06 14 14 55 31.3200 -97.3300 251.000 457.0 88.575 2.350 -999.990 -999.990 0.886 ..P WKT 2010 07 06 14 19 55 31.3200 -97.3300 251.000 30.0 101.680 2.960 -999.990 -999.990 1.017 ..P WKT 2010 07 06 14 24 55 31.3200 -97.3300 251.000 122.0 101.382 2.680 -999.990 -999.990 1.014 ..P WKT 2010 07 06 14 29 55 31.3200 -97.3300 251.000 457.0 88.515 3.340 -999.990 -999.990 0.885 ..P WKT 2010 07 06 14 39 55 31.3200 -97.3300 251.000 30.0 90.829 3.620 -999.990 -999.990 0.908 ..P WKT 2010 07 06 14 44 55 31.3200 -97.3300 251.000 122.0 93.444 3.630 -999.990 -999.990 0.934 ..P WKT 2010 07 06 14 49 55 31.3200 -97.3300 251.000 457.0 84.462 2.800 -999.990 -999.990 0.845 ..P WKT 2010 07 06 14 54 55 31.3200 -97.3300 251.000 30.0 88.753 2.630 -999.990 -999.990 0.888 ..P WKT 2010 07 06 14 59 55 31.3200 -97.3300 251.000 122.0 100.732 2.290 -999.990 -999.990 1.007 ..P WKT 2010 07 06 15 04 55 31.3200 -97.3300 251.000 457.0 96.361 2.960 -999.990 -999.990 0.964 ..P WKT 2010 07 06 15 14 55 31.3200 -97.3300 251.000 30.0 96.322 2.860 -999.990 -999.990 0.963 ..P WKT 2010 07 06 15 19 55 31.3200 -97.3300 251.000 122.0 109.745 3.550 -999.990 -999.990 1.097 ..P WKT 2010 07 06 15 24 55 31.3200 -97.3300 251.000 457.0 101.637 3.840 -999.990 -999.990 1.016 ..P WKT 2010 07 06 15 29 55 31.3200 -97.3300 251.000 30.0 95.765 2.940 -999.990 -999.990 0.958 ..P WKT 2010 07 06 15 34 55 31.3200 -97.3300 251.000 122.0 100.940 3.580 -999.990 -999.990 1.009 ..P WKT 2010 07 06 15 39 55 31.3200 -97.3300 251.000 457.0 101.781 3.770 -999.990 -999.990 1.018 ..P WKT 2010 07 06 15 49 55 31.3200 -97.3300 251.000 30.0 95.249 3.330 -999.990 -999.990 0.952 ..P WKT 2010 07 06 15 54 55 31.3200 -97.3300 251.000 122.0 99.627 3.750 -999.990 -999.990 0.996 ..P WKT 2010 07 06 15 59 55 31.3200 -97.3300 251.000 457.0 95.050 2.970 -999.990 -999.990 0.951 ..P WKT 2010 07 06 16 04 55 31.3200 -97.3300 251.000 30.0 95.090 2.940 -999.990 -999.990 0.951 ..P WKT 2010 07 06 16 09 55 31.3200 -97.3300 251.000 122.0 108.428 3.940 -999.990 -999.990 1.084 ..P WKT 2010 07 06 16 14 55 31.3200 -97.3300 251.000 457.0 92.232 3.010 -999.990 -999.990 0.922 ..P WKT 2010 07 06 16 24 55 31.3200 -97.3300 251.000 30.0 95.413 2.720 -999.990 -999.990 0.954 ..P WKT 2010 07 06 16 29 55 31.3200 -97.3300 251.000 122.0 103.876 2.910 -999.990 -999.990 1.039 ..P WKT 2010 07 06 16 34 55 31.3200 -97.3300 251.000 457.0 99.456 2.530 -999.990 -999.990 0.995 ..P WKT 2010 07 06 16 39 55 31.3200 -97.3300 251.000 30.0 94.755 3.470 -999.990 -999.990 0.948 ..P WKT 2010 07 06 16 44 55 31.3200 -97.3300 251.000 122.0 109.383 3.290 -999.990 -999.990 1.094 ..P WKT 2010 07 06 16 49 55 31.3200 -97.3300 251.000 457.0 104.123 3.350 -999.990 -999.990 1.041 ..P WKT 2010 07 06 17 04 55 31.3200 -97.3300 251.000 30.0 96.300 2.170 -999.990 -999.990 0.963 ..P WKT 2010 07 06 17 09 55 31.3200 -97.3300 251.000 122.0 107.352 2.000 -999.990 -999.990 1.074 ..P WKT 2010 07 06 17 14 55 31.3200 -97.3300 251.000 457.0 101.308 2.250 -999.990 -999.990 1.013 ..P WKT 2010 07 06 17 19 55 31.3200 -97.3300 251.000 30.0 104.793 1.860 -999.990 -999.990 1.048 ..P WKT 2010 07 06 17 24 55 31.3200 -97.3300 251.000 122.0 110.242 2.300 -999.990 -999.990 1.102 ..P WKT 2010 07 06 17 29 55 31.3200 -97.3300 251.000 457.0 103.355 1.690 -999.990 -999.990 1.034 ..P WKT 2010 07 06 17 39 55 31.3200 -97.3300 251.000 30.0 107.265 2.250 -999.990 -999.990 1.073 ..P WKT 2010 07 06 17 44 55 31.3200 -97.3300 251.000 122.0 113.297 4.030 -999.990 -999.990 1.133 ..P WKT 2010 07 06 17 49 55 31.3200 -97.3300 251.000 457.0 101.658 2.290 -999.990 -999.990 1.017 ..P WKT 2010 07 06 17 54 55 31.3200 -97.3300 251.000 30.0 99.836 3.360 -999.990 -999.990 0.998 ..P WKT 2010 07 06 17 59 55 31.3200 -97.3300 251.000 122.0 114.848 2.350 -999.990 -999.990 1.148 ..P WKT 2010 07 06 18 04 55 31.3200 -97.3300 251.000 457.0 103.486 3.000 -999.990 -999.990 1.035 ..P WKT 2010 07 06 18 14 55 31.3200 -97.3300 251.000 30.0 102.488 3.430 -999.990 -999.990 1.025 ..P WKT 2010 07 06 18 19 55 31.3200 -97.3300 251.000 122.0 113.697 2.440 -999.990 -999.990 1.137 ..P WKT 2010 07 06 18 24 55 31.3200 -97.3300 251.000 457.0 99.783 3.650 -999.990 -999.990 0.998 ..P WKT 2010 07 06 18 29 55 31.3200 -97.3300 251.000 30.0 104.257 2.470 -999.990 -999.990 1.043 ..P WKT 2010 07 06 18 34 55 31.3200 -97.3300 251.000 122.0 112.241 2.640 -999.990 -999.990 1.122 ..P WKT 2010 07 06 18 39 55 31.3200 -97.3300 251.000 457.0 107.871 2.960 -999.990 -999.990 1.079 ..P WKT 2010 07 06 18 49 55 31.3200 -97.3300 251.000 30.0 104.504 2.050 -999.990 -999.990 1.045 ..P WKT 2010 07 06 18 54 55 31.3200 -97.3300 251.000 122.0 118.853 3.470 -999.990 -999.990 1.189 ..P WKT 2010 07 06 18 59 55 31.3200 -97.3300 251.000 457.0 116.067 2.800 -999.990 -999.990 1.161 ..P WKT 2010 07 06 19 04 55 31.3200 -97.3300 251.000 30.0 120.164 2.920 -999.990 -999.990 1.202 ..P WKT 2010 07 06 19 09 55 31.3200 -97.3300 251.000 122.0 125.808 3.230 -999.990 -999.990 1.258 ..P WKT 2010 07 06 19 14 55 31.3200 -97.3300 251.000 457.0 109.954 3.320 -999.990 -999.990 1.100 ..P WKT 2010 07 06 19 24 55 31.3200 -97.3300 251.000 30.0 114.054 3.210 -999.990 -999.990 1.141 ..P WKT 2010 07 06 19 29 55 31.3200 -97.3300 251.000 122.0 118.977 3.750 -999.990 -999.990 1.190 ..P WKT 2010 07 06 19 34 55 31.3200 -97.3300 251.000 457.0 114.623 3.610 -999.990 -999.990 1.146 ..P WKT 2010 07 06 19 39 55 31.3200 -97.3300 251.000 30.0 116.171 3.750 -999.990 -999.990 1.162 ..P WKT 2010 07 06 19 44 55 31.3200 -97.3300 251.000 122.0 119.690 3.080 -999.990 -999.990 1.197 ..P WKT 2010 07 06 19 49 55 31.3200 -97.3300 251.000 457.0 119.834 3.380 -999.990 -999.990 1.198 ..P WKT 2010 07 06 19 59 55 31.3200 -97.3300 251.000 30.0 114.697 4.330 -999.990 -999.990 1.147 ..P WKT 2010 07 06 20 04 55 31.3200 -97.3300 251.000 122.0 123.622 3.880 -999.990 -999.990 1.236 ..P WKT 2010 07 06 20 09 55 31.3200 -97.3300 251.000 457.0 120.732 4.570 -999.990 -999.990 1.207 ..P WKT 2010 07 06 20 14 55 31.3200 -97.3300 251.000 30.0 111.088 3.410 -999.990 -999.990 1.111 ..P WKT 2010 07 06 20 19 55 31.3200 -97.3300 251.000 122.0 125.784 4.780 -999.990 -999.990 1.258 ..P WKT 2010 07 06 20 24 55 31.3200 -97.3300 251.000 457.0 119.235 3.320 -999.990 -999.990 1.192 ..P WKT 2010 07 06 20 34 55 31.3200 -97.3300 251.000 30.0 118.699 3.960 -999.990 -999.990 1.187 ..P WKT 2010 07 06 20 39 55 31.3200 -97.3300 251.000 122.0 124.152 4.480 -999.990 -999.990 1.242 ..P WKT 2010 07 06 20 44 55 31.3200 -97.3300 251.000 457.0 111.023 5.240 -999.990 -999.990 1.110 ..P WKT 2010 07 06 20 49 55 31.3200 -97.3300 251.000 30.0 125.488 4.290 -999.990 -999.990 1.255 ..P WKT 2010 07 06 20 54 55 31.3200 -97.3300 251.000 122.0 128.127 5.530 -999.990 -999.990 1.281 ..P WKT 2010 07 06 20 59 55 31.3200 -97.3300 251.000 457.0 119.220 4.840 -999.990 -999.990 1.192 ..P WKT 2010 07 06 21 09 55 31.3200 -97.3300 251.000 30.0 126.027 5.180 -999.990 -999.990 1.260 ..P WKT 2010 07 06 21 14 55 31.3200 -97.3300 251.000 122.0 119.773 4.930 -999.990 -999.990 1.198 ..P WKT 2010 07 06 21 19 55 31.3200 -97.3300 251.000 457.0 117.743 4.120 -999.990 -999.990 1.177 ..P WKT 2010 07 06 21 24 55 31.3200 -97.3300 251.000 30.0 122.477 4.200 -999.990 -999.990 1.225 ..P WKT 2010 07 06 21 29 55 31.3200 -97.3300 251.000 122.0 131.156 3.650 -999.990 -999.990 1.312 ..P WKT 2010 07 06 21 34 55 31.3200 -97.3300 251.000 457.0 120.954 3.920 -999.990 -999.990 1.210 ..P WKT 2010 07 06 21 44 55 31.3200 -97.3300 251.000 30.0 118.828 3.220 -999.990 -999.990 1.188 ..P WKT 2010 07 06 21 49 55 31.3200 -97.3300 251.000 122.0 131.981 3.600 -999.990 -999.990 1.320 ..P WKT 2010 07 06 21 54 55 31.3200 -97.3300 251.000 457.0 126.528 4.010 -999.990 -999.990 1.265 ..P WKT 2010 07 06 21 59 55 31.3200 -97.3300 251.000 30.0 119.663 3.760 -999.990 -999.990 1.197 ..P WKT 2010 07 06 22 04 55 31.3200 -97.3300 251.000 122.0 124.642 3.790 -999.990 -999.990 1.246 ..P WKT 2010 07 06 22 09 55 31.3200 -97.3300 251.000 457.0 119.469 3.420 -999.990 -999.990 1.195 ..P WKT 2010 07 06 22 19 55 31.3200 -97.3300 251.000 30.0 116.594 3.420 -999.990 -999.990 1.166 ..P WKT 2010 07 06 22 24 55 31.3200 -97.3300 251.000 122.0 131.591 3.850 -999.990 -999.990 1.316 ..P WKT 2010 07 06 22 29 55 31.3200 -97.3300 251.000 457.0 118.798 4.480 -999.990 -999.990 1.188 ..P WKT 2010 07 06 22 34 55 31.3200 -97.3300 251.000 30.0 121.664 4.980 -999.990 -999.990 1.217 ..P WKT 2010 07 06 22 39 55 31.3200 -97.3300 251.000 122.0 131.726 3.900 -999.990 -999.990 1.317 ..P WKT 2010 07 06 22 44 55 31.3200 -97.3300 251.000 457.0 123.727 3.400 -999.990 -999.990 1.237 ..P WKT 2010 07 06 22 54 55 31.3200 -97.3300 251.000 30.0 123.614 3.350 -999.990 -999.990 1.236 ..P WKT 2010 07 06 22 59 55 31.3200 -97.3300 251.000 122.0 130.515 3.880 -999.990 -999.990 1.305 ..P WKT 2010 07 06 23 04 55 31.3200 -97.3300 251.000 457.0 132.476 3.410 -999.990 -999.990 1.325 ..P WKT 2010 07 06 23 09 55 31.3200 -97.3300 251.000 30.0 129.919 3.470 -999.990 -999.990 1.299 ..P WKT 2010 07 06 23 14 55 31.3200 -97.3300 251.000 122.0 138.658 3.690 -999.990 -999.990 1.387 ..P WKT 2010 07 06 23 19 55 31.3200 -97.3300 251.000 457.0 130.735 3.280 -999.990 -999.990 1.307 ..P WKT 2010 07 06 23 29 55 31.3200 -97.3300 251.000 30.0 135.472 3.520 -999.990 -999.990 1.355 ..P WKT 2010 07 06 23 34 55 31.3200 -97.3300 251.000 122.0 135.139 4.310 -999.990 -999.990 1.351 ..P WKT 2010 07 06 23 39 55 31.3200 -97.3300 251.000 457.0 130.285 3.960 -999.990 -999.990 1.303 ..P WKT 2010 07 06 23 44 55 31.3200 -97.3300 251.000 30.0 129.245 4.310 -999.990 -999.990 1.292 ..P WKT 2010 07 06 23 49 55 31.3200 -97.3300 251.000 122.0 137.390 4.260 -999.990 -999.990 1.374 ..P WKT 2010 07 07 00 09 55 31.3200 -97.3300 251.000 457.0 130.446 4.400 -999.990 -999.990 1.304 ..P WKT 2010 07 07 00 10 25 31.3200 -97.3300 251.000 457.0 130.216 4.850 -999.990 -999.990 1.302 ..P WKT 2010 07 07 00 10 55 31.3200 -97.3300 251.000 457.0 129.986 4.630 -999.990 -999.990 1.300 ..P WKT 2010 07 07 00 11 25 31.3200 -97.3300 251.000 457.0 133.711 3.980 -999.990 -999.990 1.337 ..P WKT 2010 07 07 00 11 55 31.3200 -97.3300 251.000 457.0 131.079 4.580 -999.990 -999.990 1.311 ..P WKT 2010 07 07 00 12 25 31.3200 -97.3300 251.000 457.0 130.991 3.820 -999.990 -999.990 1.310 ..P WKT 2010 07 07 00 12 55 31.3200 -97.3300 251.000 457.0 131.326 3.830 -999.990 -999.990 1.313 ..P WKT 2010 07 07 00 13 25 31.3200 -97.3300 251.000 457.0 127.282 4.330 -999.990 -999.990 1.273 ..P WKT 2010 07 07 00 13 55 31.3200 -97.3300 251.000 457.0 126.627 5.120 -999.990 -999.990 1.266 ..P WKT 2010 07 07 00 14 25 31.3200 -97.3300 251.000 457.0 134.873 4.150 -999.990 -999.990 1.349 ..P WKT 2010 07 07 00 14 55 31.3200 -97.3300 251.000 457.0 132.665 4.520 -999.990 -999.990 1.327 ..P WKT 2010 07 07 00 19 55 31.3200 -97.3300 251.000 30.0 118.359 4.070 -999.990 -999.990 1.184 ..P WKT 2010 07 07 00 24 55 31.3200 -97.3300 251.000 122.0 135.266 4.440 -999.990 -999.990 1.353 ..P WKT 2010 07 07 00 29 55 31.3200 -97.3300 251.000 457.0 129.295 4.550 -999.990 -999.990 1.293 ..P WKT 2010 07 07 00 34 55 31.3200 -97.3300 251.000 30.0 117.396 4.380 -999.990 -999.990 1.174 ..P WKT 2010 07 07 00 39 55 31.3200 -97.3300 251.000 122.0 133.730 3.800 -999.990 -999.990 1.337 ..P WKT 2010 07 07 00 44 55 31.3200 -97.3300 251.000 457.0 140.180 4.530 -999.990 -999.990 1.402 ..P WKT 2010 07 07 00 54 55 31.3200 -97.3300 251.000 30.0 132.871 4.250 -999.990 -999.990 1.329 ..P WKT 2010 07 07 00 59 55 31.3200 -97.3300 251.000 122.0 140.276 4.870 -999.990 -999.990 1.403 ..P WKT 2010 07 07 01 04 55 31.3200 -97.3300 251.000 457.0 144.294 4.420 -999.990 -999.990 1.443 ..P WKT 2010 07 07 01 09 55 31.3200 -97.3300 251.000 30.0 125.751 5.310 -999.990 -999.990 1.258 ..P WKT 2010 07 07 01 14 55 31.3200 -97.3300 251.000 122.0 138.511 4.590 -999.990 -999.990 1.385 ..P WKT 2010 07 07 01 19 55 31.3200 -97.3300 251.000 457.0 152.112 3.920 -999.990 -999.990 1.521 ..P WKT 2010 07 07 01 29 55 31.3200 -97.3300 251.000 30.0 132.359 4.680 -999.990 -999.990 1.324 ..P WKT 2010 07 07 01 34 55 31.3200 -97.3300 251.000 122.0 150.865 4.800 -999.990 -999.990 1.509 ..P WKT 2010 07 07 01 39 55 31.3200 -97.3300 251.000 457.0 155.561 5.820 -999.990 -999.990 1.556 ..P WKT 2010 07 07 01 44 55 31.3200 -97.3300 251.000 30.0 136.877 6.210 -999.990 -999.990 1.369 ..P WKT 2010 07 07 01 49 55 31.3200 -97.3300 251.000 122.0 158.470 5.940 -999.990 -999.990 1.585 ..P WKT 2010 07 07 01 54 55 31.3200 -97.3300 251.000 457.0 150.773 5.370 -999.990 -999.990 1.508 ..P WKT 2010 07 07 02 04 55 31.3200 -97.3300 251.000 30.0 143.268 5.320 -999.990 -999.990 1.433 ..P WKT 2010 07 07 02 09 55 31.3200 -97.3300 251.000 122.0 159.217 5.410 -999.990 -999.990 1.592 ..P WKT 2010 07 07 02 14 55 31.3200 -97.3300 251.000 457.0 143.648 6.310 -999.990 -999.990 1.436 ..P WKT 2010 07 07 02 19 55 31.3200 -97.3300 251.000 30.0 149.181 5.720 -999.990 -999.990 1.492 ..P WKT 2010 07 07 02 24 55 31.3200 -97.3300 251.000 122.0 147.542 5.520 -999.990 -999.990 1.475 ..P WKT 2010 07 07 02 29 55 31.3200 -97.3300 251.000 457.0 130.153 3.930 -999.990 -999.990 1.302 ..P WKT 2010 07 07 02 39 55 31.3200 -97.3300 251.000 30.0 150.356 3.940 -999.990 -999.990 1.504 ..P WKT 2010 07 07 02 44 55 31.3200 -97.3300 251.000 122.0 134.944 5.490 -999.990 -999.990 1.349 ..P WKT 2010 07 07 02 49 55 31.3200 -97.3300 251.000 457.0 136.821 6.020 -999.990 -999.990 1.368 ..P WKT 2010 07 07 02 54 55 31.3200 -97.3300 251.000 30.0 150.639 5.020 -999.990 -999.990 1.506 ..P WKT 2010 07 07 02 59 55 31.3200 -97.3300 251.000 122.0 136.078 4.330 -999.990 -999.990 1.361 ..P WKT 2010 07 07 03 04 55 31.3200 -97.3300 251.000 457.0 139.919 3.780 -999.990 -999.990 1.399 ..P WKT 2010 07 07 03 14 55 31.3200 -97.3300 251.000 30.0 145.132 3.700 -999.990 -999.990 1.451 ..P WKT 2010 07 07 03 19 55 31.3200 -97.3300 251.000 122.0 134.011 4.270 -999.990 -999.990 1.340 ..P WKT 2010 07 07 03 24 55 31.3200 -97.3300 251.000 457.0 132.437 4.400 -999.990 -999.990 1.324 ..P WKT 2010 07 07 03 29 55 31.3200 -97.3300 251.000 30.0 140.687 4.200 -999.990 -999.990 1.407 ..P WKT 2010 07 07 03 34 55 31.3200 -97.3300 251.000 122.0 140.235 3.930 -999.990 -999.990 1.402 ..P WKT 2010 07 07 03 39 55 31.3200 -97.3300 251.000 457.0 126.175 3.780 -999.990 -999.990 1.262 ..P WKT 2010 07 07 03 49 55 31.3200 -97.3300 251.000 30.0 140.081 7.060 -999.990 -999.990 1.401 ..P WKT 2010 07 07 03 54 55 31.3200 -97.3300 251.000 122.0 139.850 4.300 -999.990 -999.990 1.399 ..P WKT 2010 07 07 03 59 55 31.3200 -97.3300 251.000 457.0 127.983 4.510 -999.990 -999.990 1.280 ..P WKT 2010 07 07 04 04 55 31.3200 -97.3300 251.000 30.0 147.938 4.310 -999.990 -999.990 1.479 ..P WKT 2010 07 07 04 09 55 31.3200 -97.3300 251.000 122.0 137.475 5.590 -999.990 -999.990 1.375 ..P WKT 2010 07 07 04 14 55 31.3200 -97.3300 251.000 457.0 131.219 4.730 -999.990 -999.990 1.312 ..P WKT 2010 07 07 04 24 55 31.3200 -97.3300 251.000 30.0 143.186 4.460 -999.990 -999.990 1.432 ..P WKT 2010 07 07 04 29 55 31.3200 -97.3300 251.000 122.0 121.768 4.520 -999.990 -999.990 1.218 ..P WKT 2010 07 07 04 34 55 31.3200 -97.3300 251.000 457.0 126.960 4.450 -999.990 -999.990 1.270 ..P WKT 2010 07 07 04 39 55 31.3200 -97.3300 251.000 30.0 141.672 4.290 -999.990 -999.990 1.417 ..P WKT 2010 07 07 04 44 55 31.3200 -97.3300 251.000 122.0 132.302 4.910 -999.990 -999.990 1.323 ..P WKT 2010 07 07 04 49 55 31.3200 -97.3300 251.000 457.0 119.577 3.480 -999.990 -999.990 1.196 ..P WKT 2010 07 07 05 04 55 31.3200 -97.3300 251.000 30.0 130.065 4.640 -999.990 -999.990 1.301 ..P WKT 2010 07 07 05 09 55 31.3200 -97.3300 251.000 122.0 112.714 3.590 -999.990 -999.990 1.127 ..P WKT 2010 07 07 05 14 55 31.3200 -97.3300 251.000 457.0 119.979 3.870 -999.990 -999.990 1.200 ..P WKT 2010 07 07 05 19 55 31.3200 -97.3300 251.000 30.0 129.478 4.070 -999.990 -999.990 1.295 ..P WKT 2010 07 07 05 24 55 31.3200 -97.3300 251.000 122.0 119.964 4.650 -999.990 -999.990 1.200 ..P WKT 2010 07 07 05 29 55 31.3200 -97.3300 251.000 457.0 97.035 4.390 -999.990 -999.990 0.970 ..P WKT 2010 07 07 05 39 55 31.3200 -97.3300 251.000 30.0 124.293 4.750 -999.990 -999.990 1.243 ..P WKT 2010 07 07 05 44 55 31.3200 -97.3300 251.000 122.0 108.239 4.600 -999.990 -999.990 1.082 ..P WKT 2010 07 07 05 49 55 31.3200 -97.3300 251.000 457.0 100.292 4.520 -999.990 -999.990 1.003 ..P WKT 2010 07 07 05 54 55 31.3200 -97.3300 251.000 30.0 120.277 5.070 -999.990 -999.990 1.203 ..P WKT 2010 07 07 05 59 55 31.3200 -97.3300 251.000 122.0 113.169 3.440 -999.990 -999.990 1.132 ..P WKT 2010 07 07 06 04 55 31.3200 -97.3300 251.000 457.0 96.291 3.030 -999.990 -999.990 0.963 ..P WKT 2010 07 07 06 14 55 31.3200 -97.3300 251.000 30.0 117.595 2.980 -999.990 -999.990 1.176 ..P WKT 2010 07 07 06 19 55 31.3200 -97.3300 251.000 122.0 106.785 2.980 -999.990 -999.990 1.068 ..P WKT 2010 07 07 06 24 55 31.3200 -97.3300 251.000 457.0 97.652 4.150 -999.990 -999.990 0.977 ..P WKT 2010 07 07 06 29 55 31.3200 -97.3300 251.000 30.0 116.418 4.240 -999.990 -999.990 1.164 ..P WKT 2010 07 07 06 34 55 31.3200 -97.3300 251.000 122.0 107.845 4.770 -999.990 -999.990 1.078 ..P WKT 2010 07 07 06 39 55 31.3200 -97.3300 251.000 457.0 104.294 3.620 -999.990 -999.990 1.043 ..P WKT 2010 07 07 06 49 55 31.3200 -97.3300 251.000 30.0 108.306 3.260 -999.990 -999.990 1.083 ..P WKT 2010 07 07 06 54 55 31.3200 -97.3300 251.000 122.0 102.906 3.820 -999.990 -999.990 1.029 ..P WKT 2010 07 07 06 59 55 31.3200 -97.3300 251.000 457.0 108.375 4.990 -999.990 -999.990 1.084 ..P WKT 2010 07 07 07 04 55 31.3200 -97.3300 251.000 30.0 110.777 7.190 -999.990 -999.990 1.108 ..P WKT 2010 07 07 07 09 55 31.3200 -97.3300 251.000 122.0 97.161 5.310 -999.990 -999.990 0.972 ..P WKT 2010 07 07 07 14 55 31.3200 -97.3300 251.000 457.0 113.631 4.470 -999.990 -999.990 1.136 ..P WKT 2010 07 07 07 24 55 31.3200 -97.3300 251.000 30.0 116.740 4.180 -999.990 -999.990 1.167 ..P WKT 2010 07 07 07 29 55 31.3200 -97.3300 251.000 122.0 100.885 5.880 -999.990 -999.990 1.009 ..P WKT 2010 07 07 07 34 55 31.3200 -97.3300 251.000 457.0 116.627 6.280 -999.990 -999.990 1.166 ..P WKT 2010 07 07 07 39 55 31.3200 -97.3300 251.000 30.0 115.527 6.190 -999.990 -999.990 1.155 ..P WKT 2010 07 07 07 44 55 31.3200 -97.3300 251.000 122.0 99.818 5.340 -999.990 -999.990 0.998 ..P WKT 2010 07 07 07 49 55 31.3200 -97.3300 251.000 457.0 96.773 3.730 -999.990 -999.990 0.968 ..P WKT 2010 07 07 07 59 55 31.3200 -97.3300 251.000 30.0 100.283 3.500 -999.990 -999.990 1.003 ..P WKT 2010 07 07 08 04 55 31.3200 -97.3300 251.000 122.0 102.801 5.140 -999.990 -999.990 1.028 ..P WKT 2010 07 07 08 09 55 31.3200 -97.3300 251.000 457.0 104.067 6.070 -999.990 -999.990 1.041 ..P WKT 2010 07 07 08 14 55 31.3200 -97.3300 251.000 30.0 109.224 4.790 -999.990 -999.990 1.092 ..P WKT 2010 07 07 08 19 55 31.3200 -97.3300 251.000 122.0 104.375 3.540 -999.990 -999.990 1.044 ..P WKT 2010 07 07 08 24 55 31.3200 -97.3300 251.000 457.0 108.141 2.800 -999.990 -999.990 1.081 ..P WKT 2010 07 07 08 34 55 31.3200 -97.3300 251.000 30.0 114.361 3.870 -999.990 -999.990 1.144 ..P WKT 2010 07 07 08 39 55 31.3200 -97.3300 251.000 122.0 110.426 3.420 -999.990 -999.990 1.104 ..P WKT 2010 07 07 08 44 55 31.3200 -97.3300 251.000 457.0 107.326 5.040 -999.990 -999.990 1.073 ..P WKT 2010 07 07 08 49 55 31.3200 -97.3300 251.000 30.0 104.504 3.160 -999.990 -999.990 1.045 ..P WKT 2010 07 07 08 54 55 31.3200 -97.3300 251.000 122.0 108.624 2.550 -999.990 -999.990 1.086 ..P WKT 2010 07 07 08 59 55 31.3200 -97.3300 251.000 457.0 111.076 3.420 -999.990 -999.990 1.111 ..P WKT 2010 07 07 09 09 55 31.3200 -97.3300 251.000 30.0 103.969 3.160 -999.990 -999.990 1.040 ..P WKT 2010 07 07 09 14 55 31.3200 -97.3300 251.000 122.0 109.394 2.770 -999.990 -999.990 1.094 ..P WKT 2010 07 07 09 19 55 31.3200 -97.3300 251.000 457.0 108.992 5.230 -999.990 -999.990 1.090 ..P WKT 2010 07 07 09 24 55 31.3200 -97.3300 251.000 30.0 105.817 2.550 -999.990 -999.990 1.058 ..P WKT 2010 07 07 09 29 55 31.3200 -97.3300 251.000 122.0 110.684 4.290 -999.990 -999.990 1.107 ..P WKT 2010 07 07 09 34 55 31.3200 -97.3300 251.000 457.0 106.955 2.700 -999.990 -999.990 1.070 ..P WKT 2010 07 07 09 44 55 31.3200 -97.3300 251.000 30.0 107.143 2.120 -999.990 -999.990 1.071 ..P WKT 2010 07 07 09 49 55 31.3200 -97.3300 251.000 122.0 123.526 3.350 -999.990 -999.990 1.235 ..P WKT 2010 07 07 09 54 55 31.3200 -97.3300 251.000 457.0 108.596 2.860 -999.990 -999.990 1.086 ..P WKT 2010 07 07 09 59 55 31.3200 -97.3300 251.000 30.0 105.860 2.760 -999.990 -999.990 1.059 ..P WKT 2010 07 07 10 04 55 31.3200 -97.3300 251.000 122.0 134.698 2.910 -999.990 -999.990 1.347 ..P WKT 2010 07 07 10 09 55 31.3200 -97.3300 251.000 457.0 106.622 3.400 -999.990 -999.990 1.066 ..P WKT 2010 07 07 10 19 55 31.3200 -97.3300 251.000 30.0 109.992 3.060 -999.990 -999.990 1.100 ..P WKT 2010 07 07 10 24 55 31.3200 -97.3300 251.000 122.0 137.545 3.090 -999.990 -999.990 1.375 ..P WKT 2010 07 07 10 29 55 31.3200 -97.3300 251.000 457.0 102.687 3.520 -999.990 -999.990 1.027 ..P WKT 2010 07 07 10 34 55 31.3200 -97.3300 251.000 30.0 109.481 2.430 -999.990 -999.990 1.095 ..P WKT 2010 07 07 10 39 55 31.3200 -97.3300 251.000 122.0 124.986 2.640 -999.990 -999.990 1.250 ..P WKT 2010 07 07 10 44 55 31.3200 -97.3300 251.000 457.0 113.658 3.020 -999.990 -999.990 1.137 ..P WKT 2010 07 07 10 54 55 31.3200 -97.3300 251.000 30.0 101.677 2.500 -999.990 -999.990 1.017 ..P WKT 2010 07 07 10 59 55 31.3200 -97.3300 251.000 122.0 125.210 2.990 -999.990 -999.990 1.252 ..P WKT 2010 07 07 11 04 55 31.3200 -97.3300 251.000 457.0 108.933 2.690 -999.990 -999.990 1.089 ..P WKT 2010 07 07 11 09 55 31.3200 -97.3300 251.000 30.0 100.816 3.440 -999.990 -999.990 1.008 ..P WKT 2010 07 07 11 14 55 31.3200 -97.3300 251.000 122.0 116.048 4.030 -999.990 -999.990 1.160 ..P WKT 2010 07 07 11 19 55 31.3200 -97.3300 251.000 457.0 109.174 2.950 -999.990 -999.990 1.092 ..P WKT 2010 07 07 11 29 55 31.3200 -97.3300 251.000 30.0 108.994 3.910 -999.990 -999.990 1.090 ..P WKT 2010 07 07 11 34 55 31.3200 -97.3300 251.000 122.0 126.316 3.150 -999.990 -999.990 1.263 ..P WKT 2010 07 07 11 39 55 31.3200 -97.3300 251.000 457.0 105.532 4.470 -999.990 -999.990 1.055 ..P WKT 2010 07 07 11 44 55 31.3200 -97.3300 251.000 30.0 107.942 3.420 -999.990 -999.990 1.079 ..P WKT 2010 07 07 11 49 55 31.3200 -97.3300 251.000 122.0 128.981 2.850 -999.990 -999.990 1.290 ..P WKT 2010 07 07 12 09 55 31.3200 -97.3300 251.000 457.0 116.813 2.860 -999.990 -999.990 1.168 ..P WKT 2010 07 07 12 10 25 31.3200 -97.3300 251.000 457.0 119.851 2.200 -999.990 -999.990 1.199 ..P WKT 2010 07 07 12 10 55 31.3200 -97.3300 251.000 457.0 120.959 2.020 -999.990 -999.990 1.210 ..P WKT 2010 07 07 12 11 25 31.3200 -97.3300 251.000 457.0 120.549 2.190 -999.990 -999.990 1.205 ..P WKT 2010 07 07 12 11 55 31.3200 -97.3300 251.000 457.0 121.242 3.680 -999.990 -999.990 1.212 ..P WKT 2010 07 07 12 12 25 31.3200 -97.3300 251.000 457.0 118.762 2.630 -999.990 -999.990 1.188 ..P WKT 2010 07 07 12 12 55 31.3200 -97.3300 251.000 457.0 116.557 2.100 -999.990 -999.990 1.166 ..P WKT 2010 07 07 12 13 25 31.3200 -97.3300 251.000 457.0 120.977 2.160 -999.990 -999.990 1.210 ..P WKT 2010 07 07 12 13 55 31.3200 -97.3300 251.000 457.0 122.912 2.160 -999.990 -999.990 1.229 ..P WKT 2010 07 07 12 14 25 31.3200 -97.3300 251.000 457.0 122.916 2.910 -999.990 -999.990 1.229 ..P WKT 2010 07 07 12 14 55 31.3200 -97.3300 251.000 457.0 117.124 2.180 -999.990 -999.990 1.171 ..P WKT 2010 07 07 12 19 55 31.3200 -97.3300 251.000 30.0 124.335 2.920 -999.990 -999.990 1.243 ..P WKT 2010 07 07 12 24 55 31.3200 -97.3300 251.000 122.0 127.407 3.330 -999.990 -999.990 1.274 ..P WKT 2010 07 07 12 29 55 31.3200 -97.3300 251.000 457.0 115.019 3.820 -999.990 -999.990 1.150 ..P WKT 2010 07 07 12 34 55 31.3200 -97.3300 251.000 30.0 125.822 3.010 -999.990 -999.990 1.258 ..P WKT 2010 07 07 12 39 55 31.3200 -97.3300 251.000 122.0 127.239 4.890 -999.990 -999.990 1.272 ..P WKT 2010 07 07 12 44 55 31.3200 -97.3300 251.000 457.0 121.475 2.870 -999.990 -999.990 1.215 ..P WKT 2010 07 07 12 54 55 31.3200 -97.3300 251.000 30.0 113.519 4.360 -999.990 -999.990 1.135 ..P WKT 2010 07 07 12 59 55 31.3200 -97.3300 251.000 122.0 136.746 2.850 -999.990 -999.990 1.367 ..P WKT 2010 07 07 13 04 55 31.3200 -97.3300 251.000 457.0 118.531 2.420 -999.990 -999.990 1.185 ..P WKT 2010 07 07 13 09 55 31.3200 -97.3300 251.000 30.0 118.828 3.440 -999.990 -999.990 1.188 ..P WKT 2010 07 07 13 14 55 31.3200 -97.3300 251.000 122.0 119.123 4.310 -999.990 -999.990 1.191 ..P WKT 2010 07 07 13 19 55 31.3200 -97.3300 251.000 457.0 119.696 1.830 -999.990 -999.990 1.197 ..P WKT 2010 07 07 13 29 55 31.3200 -97.3300 251.000 30.0 123.448 1.930 -999.990 -999.990 1.234 ..P WKT 2010 07 07 13 34 55 31.3200 -97.3300 251.000 122.0 133.542 2.470 -999.990 -999.990 1.335 ..P WKT 2010 07 07 13 39 55 31.3200 -97.3300 251.000 457.0 125.109 2.870 -999.990 -999.990 1.251 ..P WKT 2010 07 07 13 44 55 31.3200 -97.3300 251.000 30.0 122.759 2.810 -999.990 -999.990 1.228 ..P WKT 2010 07 07 13 49 55 31.3200 -97.3300 251.000 122.0 127.599 2.050 -999.990 -999.990 1.276 ..P WKT 2010 07 07 13 54 55 31.3200 -97.3300 251.000 457.0 117.779 2.100 -999.990 -999.990 1.178 ..P WKT 2010 07 07 14 04 55 31.3200 -97.3300 251.000 30.0 128.353 3.360 -999.990 -999.990 1.284 ..P WKT 2010 07 07 14 09 55 31.3200 -97.3300 251.000 122.0 131.043 3.030 -999.990 -999.990 1.310 ..P WKT 2010 07 07 14 14 55 31.3200 -97.3300 251.000 457.0 125.983 3.460 -999.990 -999.990 1.260 ..P WKT 2010 07 07 14 19 55 31.3200 -97.3300 251.000 30.0 127.704 2.760 -999.990 -999.990 1.277 ..P WKT 2010 07 07 14 24 55 31.3200 -97.3300 251.000 122.0 130.810 3.810 -999.990 -999.990 1.308 ..P WKT 2010 07 07 14 29 55 31.3200 -97.3300 251.000 457.0 124.226 3.290 -999.990 -999.990 1.242 ..P WKT 2010 07 07 14 39 55 31.3200 -97.3300 251.000 30.0 128.341 5.870 -999.990 -999.990 1.283 ..P WKT 2010 07 07 14 44 55 31.3200 -97.3300 251.000 122.0 140.707 3.640 -999.990 -999.990 1.407 ..P WKT 2010 07 07 14 49 55 31.3200 -97.3300 251.000 457.0 128.146 2.650 -999.990 -999.990 1.281 ..P WKT 2010 07 07 14 54 55 31.3200 -97.3300 251.000 30.0 133.589 3.580 -999.990 -999.990 1.336 ..P WKT 2010 07 07 14 59 55 31.3200 -97.3300 251.000 122.0 143.466 3.630 -999.990 -999.990 1.435 ..P WKT 2010 07 07 15 04 55 31.3200 -97.3300 251.000 457.0 128.683 2.680 -999.990 -999.990 1.287 ..P WKT 2010 07 07 15 14 55 31.3200 -97.3300 251.000 30.0 146.484 2.640 -999.990 -999.990 1.465 ..P WKT 2010 07 07 15 19 55 31.3200 -97.3300 251.000 122.0 145.537 3.370 -999.990 -999.990 1.455 ..P WKT 2010 07 07 15 24 55 31.3200 -97.3300 251.000 457.0 123.658 3.130 -999.990 -999.990 1.237 ..P WKT 2010 07 07 15 29 55 31.3200 -97.3300 251.000 30.0 139.344 3.360 -999.990 -999.990 1.393 ..P WKT 2010 07 07 15 34 55 31.3200 -97.3300 251.000 122.0 156.559 3.640 -999.990 -999.990 1.566 ..P WKT 2010 07 07 15 39 55 31.3200 -97.3300 251.000 457.0 122.055 3.470 -999.990 -999.990 1.221 ..P WKT 2010 07 07 15 49 55 31.3200 -97.3300 251.000 30.0 153.581 3.430 -999.990 -999.990 1.536 ..P WKT 2010 07 07 15 54 55 31.3200 -97.3300 251.000 122.0 154.853 3.890 -999.990 -999.990 1.549 ..P WKT 2010 07 07 15 59 55 31.3200 -97.3300 251.000 457.0 115.754 4.280 -999.990 -999.990 1.158 ..P WKT 2010 07 07 16 04 55 31.3200 -97.3300 251.000 30.0 148.242 3.630 -999.990 -999.990 1.482 ..P WKT 2010 07 07 16 09 55 31.3200 -97.3300 251.000 122.0 141.188 3.220 -999.990 -999.990 1.412 ..P WKT 2010 07 07 16 14 55 31.3200 -97.3300 251.000 457.0 126.360 3.070 -999.990 -999.990 1.264 ..P WKT 2010 07 07 16 24 55 31.3200 -97.3300 251.000 30.0 128.206 2.700 -999.990 -999.990 1.282 ..P WKT 2010 07 07 16 29 55 31.3200 -97.3300 251.000 122.0 134.614 2.560 -999.990 -999.990 1.346 ..P WKT 2010 07 07 16 34 55 31.3200 -97.3300 251.000 457.0 132.414 3.090 -999.990 -999.990 1.324 ..P WKT 2010 07 07 16 39 55 31.3200 -97.3300 251.000 30.0 131.602 2.440 -999.990 -999.990 1.316 ..P WKT 2010 07 07 16 44 55 31.3200 -97.3300 251.000 122.0 134.401 2.020 -999.990 -999.990 1.344 ..P WKT 2010 07 07 16 49 55 31.3200 -97.3300 251.000 457.0 111.920 4.430 -999.990 -999.990 1.119 ..P WKT 2010 07 07 17 04 55 31.3200 -97.3300 251.000 30.0 108.364 2.570 -999.990 -999.990 1.084 ..P WKT 2010 07 07 17 09 55 31.3200 -97.3300 251.000 122.0 116.027 2.650 -999.990 -999.990 1.160 ..P WKT 2010 07 07 17 14 55 31.3200 -97.3300 251.000 457.0 122.856 3.650 -999.990 -999.990 1.229 ..P WKT 2010 07 07 17 19 55 31.3200 -97.3300 251.000 30.0 115.231 2.050 -999.990 -999.990 1.152 ..P WKT 2010 07 07 17 24 55 31.3200 -97.3300 251.000 122.0 123.731 4.500 -999.990 -999.990 1.237 ..P WKT 2010 07 07 17 29 55 31.3200 -97.3300 251.000 457.0 118.329 2.800 -999.990 -999.990 1.183 ..P WKT 2010 07 07 17 39 55 31.3200 -97.3300 251.000 30.0 118.051 2.340 -999.990 -999.990 1.181 ..P WKT 2010 07 07 17 44 55 31.3200 -97.3300 251.000 122.0 124.290 2.110 -999.990 -999.990 1.243 ..P WKT 2010 07 07 17 49 55 31.3200 -97.3300 251.000 457.0 112.168 2.480 -999.990 -999.990 1.122 ..P WKT 2010 07 07 17 54 55 31.3200 -97.3300 251.000 30.0 115.069 3.300 -999.990 -999.990 1.151 ..P WKT 2010 07 07 17 59 55 31.3200 -97.3300 251.000 122.0 120.197 1.670 -999.990 -999.990 1.202 ..P WKT 2010 07 07 18 04 55 31.3200 -97.3300 251.000 457.0 118.229 2.380 -999.990 -999.990 1.182 ..P WKT 2010 07 07 18 14 55 31.3200 -97.3300 251.000 30.0 134.951 1.990 -999.990 -999.990 1.350 ..P WKT 2010 07 07 18 19 55 31.3200 -97.3300 251.000 122.0 173.135 8.290 -999.990 -999.990 1.731 ..P WKT 2010 07 07 18 24 55 31.3200 -97.3300 251.000 457.0 116.100 4.940 -999.990 -999.990 1.161 ..P WKT 2010 07 07 18 29 55 31.3200 -97.3300 251.000 30.0 129.228 6.250 -999.990 -999.990 1.292 ..P WKT 2010 07 07 18 34 55 31.3200 -97.3300 251.000 122.0 120.078 3.510 -999.990 -999.990 1.201 ..P WKT 2010 07 07 18 39 55 31.3200 -97.3300 251.000 457.0 111.205 4.820 -999.990 -999.990 1.112 ..P WKT 2010 07 07 18 49 55 31.3200 -97.3300 251.000 30.0 102.288 4.560 -999.990 -999.990 1.023 ..P WKT 2010 07 07 18 54 55 31.3200 -97.3300 251.000 122.0 123.841 3.290 -999.990 -999.990 1.238 ..P WKT 2010 07 07 18 59 55 31.3200 -97.3300 251.000 457.0 105.409 4.820 -999.990 -999.990 1.054 ..P WKT 2010 07 07 19 04 55 31.3200 -97.3300 251.000 30.0 120.975 3.500 -999.990 -999.990 1.210 ..P WKT 2010 07 07 19 09 55 31.3200 -97.3300 251.000 122.0 125.256 3.380 -999.990 -999.990 1.253 ..P WKT 2010 07 07 19 14 55 31.3200 -97.3300 251.000 457.0 114.902 2.900 -999.990 -999.990 1.149 ..P WKT 2010 07 07 19 24 55 31.3200 -97.3300 251.000 30.0 124.780 3.500 -999.990 -999.990 1.248 ..P WKT 2010 07 07 19 29 55 31.3200 -97.3300 251.000 122.0 130.796 3.810 -999.990 -999.990 1.308 ..P WKT 2010 07 07 19 34 55 31.3200 -97.3300 251.000 457.0 118.127 3.000 -999.990 -999.990 1.181 ..P WKT 2010 07 07 19 39 55 31.3200 -97.3300 251.000 30.0 146.041 2.960 -999.990 -999.990 1.460 ..P WKT 2010 07 07 19 44 55 31.3200 -97.3300 251.000 122.0 126.675 3.090 -999.990 -999.990 1.267 ..P WKT 2010 07 07 19 49 55 31.3200 -97.3300 251.000 457.0 114.420 3.200 -999.990 -999.990 1.144 ..P WKT 2010 07 07 19 59 55 31.3200 -97.3300 251.000 30.0 124.127 3.510 -999.990 -999.990 1.241 ..P WKT 2010 07 07 20 04 55 31.3200 -97.3300 251.000 122.0 130.886 3.190 -999.990 -999.990 1.309 ..P WKT 2010 07 07 20 09 55 31.3200 -97.3300 251.000 457.0 117.269 3.140 -999.990 -999.990 1.173 ..P WKT 2010 07 07 20 14 55 31.3200 -97.3300 251.000 30.0 115.933 3.430 -999.990 -999.990 1.159 ..P WKT 2010 07 07 20 19 55 31.3200 -97.3300 251.000 122.0 117.667 3.090 -999.990 -999.990 1.177 ..P WKT 2010 07 07 20 24 55 31.3200 -97.3300 251.000 457.0 122.754 5.450 -999.990 -999.990 1.228 ..P WKT 2010 07 07 20 34 55 31.3200 -97.3300 251.000 30.0 120.840 3.530 -999.990 -999.990 1.208 ..P WKT 2010 07 07 20 39 55 31.3200 -97.3300 251.000 122.0 125.848 3.450 -999.990 -999.990 1.258 ..P WKT 2010 07 07 20 44 55 31.3200 -97.3300 251.000 457.0 120.520 3.940 -999.990 -999.990 1.205 ..P WKT 2010 07 07 20 49 55 31.3200 -97.3300 251.000 30.0 111.000 3.800 -999.990 -999.990 1.110 ..P WKT 2010 07 07 20 54 55 31.3200 -97.3300 251.000 122.0 109.303 3.880 -999.990 -999.990 1.093 ..P WKT 2010 07 07 20 59 55 31.3200 -97.3300 251.000 457.0 118.784 3.970 -999.990 -999.990 1.188 ..P WKT 2010 07 07 21 09 55 31.3200 -97.3300 251.000 30.0 110.357 4.420 -999.990 -999.990 1.104 ..P WKT 2010 07 07 21 14 55 31.3200 -97.3300 251.000 122.0 126.272 3.720 -999.990 -999.990 1.263 ..P WKT 2010 07 07 21 19 55 31.3200 -97.3300 251.000 457.0 109.476 4.210 -999.990 -999.990 1.095 ..P WKT 2010 07 07 21 24 55 31.3200 -97.3300 251.000 30.0 110.854 3.470 -999.990 -999.990 1.109 ..P WKT 2010 07 07 21 29 55 31.3200 -97.3300 251.000 122.0 121.461 3.690 -999.990 -999.990 1.215 ..P WKT 2010 07 07 21 34 55 31.3200 -97.3300 251.000 457.0 115.008 3.140 -999.990 -999.990 1.150 ..P WKT 2010 07 07 21 44 55 31.3200 -97.3300 251.000 30.0 123.281 2.680 -999.990 -999.990 1.233 ..P WKT 2010 07 07 21 49 55 31.3200 -97.3300 251.000 122.0 122.901 3.270 -999.990 -999.990 1.229 ..P WKT 2010 07 07 21 54 55 31.3200 -97.3300 251.000 457.0 107.130 5.080 -999.990 -999.990 1.071 ..P WKT 2010 07 07 21 59 55 31.3200 -97.3300 251.000 30.0 118.784 4.430 -999.990 -999.990 1.188 ..P WKT 2010 07 07 22 04 55 31.3200 -97.3300 251.000 122.0 124.002 2.820 -999.990 -999.990 1.240 ..P WKT 2010 07 07 22 09 55 31.3200 -97.3300 251.000 457.0 109.485 4.210 -999.990 -999.990 1.095 ..P WKT 2010 07 07 22 19 55 31.3200 -97.3300 251.000 30.0 120.884 2.330 -999.990 -999.990 1.209 ..P WKT 2010 07 07 22 24 55 31.3200 -97.3300 251.000 122.0 117.263 5.430 -999.990 -999.990 1.173 ..P WKT 2010 07 07 22 29 55 31.3200 -97.3300 251.000 457.0 119.663 3.870 -999.990 -999.990 1.197 ..P WKT 2010 07 07 22 34 55 31.3200 -97.3300 251.000 30.0 114.221 2.950 -999.990 -999.990 1.142 ..P WKT 2010 07 07 22 39 55 31.3200 -97.3300 251.000 122.0 131.470 3.880 -999.990 -999.990 1.315 ..P WKT 2010 07 07 22 44 55 31.3200 -97.3300 251.000 457.0 119.724 3.140 -999.990 -999.990 1.197 ..P WKT 2010 07 07 22 54 55 31.3200 -97.3300 251.000 30.0 118.422 2.860 -999.990 -999.990 1.184 ..P WKT 2010 07 07 22 59 55 31.3200 -97.3300 251.000 122.0 119.484 3.100 -999.990 -999.990 1.195 ..P WKT 2010 07 07 23 04 55 31.3200 -97.3300 251.000 457.0 115.499 2.650 -999.990 -999.990 1.155 ..P WKT 2010 07 07 23 09 55 31.3200 -97.3300 251.000 30.0 113.196 2.790 -999.990 -999.990 1.132 ..P WKT 2010 07 07 23 14 55 31.3200 -97.3300 251.000 122.0 120.705 3.580 -999.990 -999.990 1.207 ..P WKT 2010 07 07 23 19 55 31.3200 -97.3300 251.000 457.0 109.709 3.210 -999.990 -999.990 1.097 ..P WKT 2010 07 07 23 29 55 31.3200 -97.3300 251.000 30.0 106.967 2.530 -999.990 -999.990 1.070 ..P WKT 2010 07 07 23 34 55 31.3200 -97.3300 251.000 122.0 115.787 4.820 -999.990 -999.990 1.158 ..P WKT 2010 07 07 23 39 55 31.3200 -97.3300 251.000 457.0 104.408 3.150 -999.990 -999.990 1.044 ..P WKT 2010 07 07 23 44 55 31.3200 -97.3300 251.000 30.0 103.410 3.440 -999.990 -999.990 1.034 ..P WKT 2010 07 07 23 49 55 31.3200 -97.3300 251.000 122.0 104.796 3.490 -999.990 -999.990 1.048 ..P WKT 2010 07 08 00 09 55 31.3200 -97.3300 251.000 457.0 94.759 2.310 -999.990 -999.990 0.948 ..P WKT 2010 07 08 00 10 25 31.3200 -97.3300 251.000 457.0 93.693 2.460 -999.990 -999.990 0.937 ..P WKT 2010 07 08 00 10 55 31.3200 -97.3300 251.000 457.0 95.153 3.580 -999.990 -999.990 0.952 ..P WKT 2010 07 08 00 11 25 31.3200 -97.3300 251.000 457.0 92.964 2.400 -999.990 -999.990 0.930 ..P WKT 2010 07 08 00 11 55 31.3200 -97.3300 251.000 457.0 89.090 2.650 -999.990 -999.990 0.891 ..P WKT 2010 07 08 00 12 25 31.3200 -97.3300 251.000 457.0 86.340 3.320 -999.990 -999.990 0.863 ..P WKT 2010 07 08 00 12 55 31.3200 -97.3300 251.000 457.0 84.431 2.700 -999.990 -999.990 0.844 ..P WKT 2010 07 08 00 13 25 31.3200 -97.3300 251.000 457.0 77.189 2.420 -999.990 -999.990 0.772 ..P WKT 2010 07 08 00 13 55 31.3200 -97.3300 251.000 457.0 82.017 2.550 -999.990 -999.990 0.820 ..P WKT 2010 07 08 00 14 25 31.3200 -97.3300 251.000 457.0 85.723 2.930 -999.990 -999.990 0.857 ..P WKT 2010 07 08 00 14 55 31.3200 -97.3300 251.000 457.0 81.569 2.930 -999.990 -999.990 0.816 ..P WKT 2010 07 08 00 19 55 31.3200 -97.3300 251.000 30.0 88.588 2.830 -999.990 -999.990 0.886 ..P WKT 2010 07 08 00 24 55 31.3200 -97.3300 251.000 122.0 87.468 3.060 -999.990 -999.990 0.875 ..P WKT 2010 07 08 00 29 55 31.3200 -97.3300 251.000 457.0 83.260 3.190 -999.990 -999.990 0.833 ..P WKT 2010 07 08 00 34 55 31.3200 -97.3300 251.000 30.0 86.350 3.540 -999.990 -999.990 0.863 ..P WKT 2010 07 08 00 39 55 31.3200 -97.3300 251.000 122.0 91.966 4.500 -999.990 -999.990 0.920 ..P WKT 2010 07 08 00 44 55 31.3200 -97.3300 251.000 457.0 97.021 3.890 -999.990 -999.990 0.970 ..P WKT 2010 07 08 00 54 55 31.3200 -97.3300 251.000 30.0 89.687 3.730 -999.990 -999.990 0.897 ..P WKT 2010 07 08 00 59 55 31.3200 -97.3300 251.000 122.0 95.544 5.040 -999.990 -999.990 0.955 ..P WKT 2010 07 08 01 04 55 31.3200 -97.3300 251.000 457.0 91.015 3.280 -999.990 -999.990 0.910 ..P WKT 2010 07 08 01 09 55 31.3200 -97.3300 251.000 30.0 94.626 2.540 -999.990 -999.990 0.946 ..P WKT 2010 07 08 01 14 55 31.3200 -97.3300 251.000 122.0 93.185 2.530 -999.990 -999.990 0.932 ..P WKT 2010 07 08 01 19 55 31.3200 -97.3300 251.000 457.0 88.095 1.860 -999.990 -999.990 0.881 ..P WKT 2010 07 08 01 29 55 31.3200 -97.3300 251.000 30.0 93.833 3.910 -999.990 -999.990 0.938 ..P WKT 2010 07 08 01 34 55 31.3200 -97.3300 251.000 122.0 91.470 2.690 -999.990 -999.990 0.915 ..P WKT 2010 07 08 01 39 55 31.3200 -97.3300 251.000 457.0 89.106 4.100 -999.990 -999.990 0.891 ..P WKT 2010 07 08 01 44 55 31.3200 -97.3300 251.000 30.0 93.479 2.070 -999.990 -999.990 0.935 ..P WKT 2010 07 08 01 49 55 31.3200 -97.3300 251.000 122.0 90.554 3.130 -999.990 -999.990 0.906 ..P WKT 2010 07 08 01 54 55 31.3200 -97.3300 251.000 457.0 92.261 3.500 -999.990 -999.990 0.923 ..P WKT 2010 07 08 02 04 55 31.3200 -97.3300 251.000 30.0 91.704 2.830 -999.990 -999.990 0.917 ..P WKT 2010 07 08 02 09 55 31.3200 -97.3300 251.000 122.0 91.686 2.770 -999.990 -999.990 0.917 ..P WKT 2010 07 08 02 14 55 31.3200 -97.3300 251.000 457.0 89.282 4.650 -999.990 -999.990 0.893 ..P WKT 2010 07 08 02 19 55 31.3200 -97.3300 251.000 30.0 93.054 2.850 -999.990 -999.990 0.931 ..P WKT 2010 07 08 02 24 55 31.3200 -97.3300 251.000 122.0 95.703 5.700 -999.990 -999.990 0.957 ..P WKT 2010 07 08 02 29 55 31.3200 -97.3300 251.000 457.0 91.475 2.830 -999.990 -999.990 0.915 ..P WKT 2010 07 08 02 39 55 31.3200 -97.3300 251.000 30.0 92.923 2.850 -999.990 -999.990 0.929 ..P WKT 2010 07 08 02 44 55 31.3200 -97.3300 251.000 122.0 90.458 2.850 -999.990 -999.990 0.905 ..P WKT 2010 07 08 02 49 55 31.3200 -97.3300 251.000 457.0 88.837 2.490 -999.990 -999.990 0.888 ..P WKT 2010 07 08 02 54 55 31.3200 -97.3300 251.000 30.0 86.092 3.290 -999.990 -999.990 0.861 ..P WKT 2010 07 08 02 59 55 31.3200 -97.3300 251.000 122.0 86.997 3.540 -999.990 -999.990 0.870 ..P WKT 2010 07 08 03 04 55 31.3200 -97.3300 251.000 457.0 87.480 2.500 -999.990 -999.990 0.875 ..P WKT 2010 07 08 03 14 55 31.3200 -97.3300 251.000 30.0 83.215 2.810 -999.990 -999.990 0.832 ..P WKT 2010 07 08 03 19 55 31.3200 -97.3300 251.000 122.0 88.710 2.960 -999.990 -999.990 0.887 ..P WKT 2010 07 08 03 24 55 31.3200 -97.3300 251.000 457.0 86.487 2.850 -999.990 -999.990 0.865 ..P WKT 2010 07 08 03 29 55 31.3200 -97.3300 251.000 30.0 86.790 1.860 -999.990 -999.990 0.868 ..P WKT 2010 07 08 03 34 55 31.3200 -97.3300 251.000 122.0 97.057 2.170 -999.990 -999.990 0.971 ..P WKT 2010 07 08 03 39 55 31.3200 -97.3300 251.000 457.0 95.395 1.670 -999.990 -999.990 0.954 ..P WKT 2010 07 08 03 49 55 31.3200 -97.3300 251.000 30.0 84.353 3.510 -999.990 -999.990 0.844 ..P WKT 2010 07 08 03 54 55 31.3200 -97.3300 251.000 122.0 90.129 2.340 -999.990 -999.990 0.901 ..P WKT 2010 07 08 03 59 55 31.3200 -97.3300 251.000 457.0 85.239 1.980 -999.990 -999.990 0.852 ..P WKT 2010 07 08 04 04 55 31.3200 -97.3300 251.000 30.0 91.297 2.740 -999.990 -999.990 0.913 ..P WKT 2010 07 08 04 09 55 31.3200 -97.3300 251.000 122.0 87.811 2.570 -999.990 -999.990 0.878 ..P WKT 2010 07 08 04 14 55 31.3200 -97.3300 251.000 457.0 85.447 4.390 -999.990 -999.990 0.854 ..P WKT 2010 07 08 04 24 55 31.3200 -97.3300 251.000 30.0 83.366 3.400 -999.990 -999.990 0.834 ..P WKT 2010 07 08 04 29 55 31.3200 -97.3300 251.000 122.0 94.315 2.730 -999.990 -999.990 0.943 ..P WKT 2010 07 08 04 34 55 31.3200 -97.3300 251.000 457.0 95.720 2.980 -999.990 -999.990 0.957 ..P WKT 2010 07 08 04 39 55 31.3200 -97.3300 251.000 30.0 90.390 3.680 -999.990 -999.990 0.904 ..P WKT 2010 07 08 04 44 55 31.3200 -97.3300 251.000 122.0 94.602 2.770 -999.990 -999.990 0.946 ..P WKT 2010 07 08 04 49 55 31.3200 -97.3300 251.000 457.0 97.973 1.850 -999.990 -999.990 0.980 ..P WKT 2010 07 08 05 04 55 31.3200 -97.3300 251.000 30.0 95.874 3.720 -999.990 -999.990 0.959 ..P WKT 2010 07 08 05 09 55 31.3200 -97.3300 251.000 122.0 97.350 3.730 -999.990 -999.990 0.973 ..P WKT 2010 07 08 05 14 55 31.3200 -97.3300 251.000 457.0 86.757 3.970 -999.990 -999.990 0.868 ..P WKT 2010 07 08 05 19 55 31.3200 -97.3300 251.000 30.0 89.917 3.700 -999.990 -999.990 0.899 ..P WKT 2010 07 08 05 24 55 31.3200 -97.3300 251.000 122.0 96.725 2.100 -999.990 -999.990 0.967 ..P WKT 2010 07 08 05 29 55 31.3200 -97.3300 251.000 457.0 85.851 2.880 -999.990 -999.990 0.859 ..P WKT 2010 07 08 05 39 55 31.3200 -97.3300 251.000 30.0 99.458 1.640 -999.990 -999.990 0.995 ..P WKT 2010 07 08 05 44 55 31.3200 -97.3300 251.000 122.0 100.082 3.810 -999.990 -999.990 1.001 ..P WKT 2010 07 08 05 49 55 31.3200 -97.3300 251.000 457.0 91.725 2.330 -999.990 -999.990 0.917 ..P WKT 2010 07 08 05 54 55 31.3200 -97.3300 251.000 30.0 85.331 3.050 -999.990 -999.990 0.853 ..P WKT 2010 07 08 05 59 55 31.3200 -97.3300 251.000 122.0 90.586 2.410 -999.990 -999.990 0.906 ..P WKT 2010 07 08 06 04 55 31.3200 -97.3300 251.000 457.0 85.456 2.760 -999.990 -999.990 0.855 ..P WKT 2010 07 08 06 14 55 31.3200 -97.3300 251.000 30.0 95.204 3.350 -999.990 -999.990 0.952 ..P WKT 2010 07 08 06 19 55 31.3200 -97.3300 251.000 122.0 98.293 4.700 -999.990 -999.990 0.983 ..P WKT 2010 07 08 06 24 55 31.3200 -97.3300 251.000 457.0 91.981 2.750 -999.990 -999.990 0.920 ..P WKT 2010 07 08 06 29 55 31.3200 -97.3300 251.000 30.0 97.737 2.800 -999.990 -999.990 0.977 ..P WKT 2010 07 08 06 34 55 31.3200 -97.3300 251.000 122.0 96.195 3.130 -999.990 -999.990 0.962 ..P WKT 2010 07 08 06 39 55 31.3200 -97.3300 251.000 457.0 87.356 2.530 -999.990 -999.990 0.874 ..P WKT 2010 07 08 06 49 55 31.3200 -97.3300 251.000 30.0 95.039 3.410 -999.990 -999.990 0.950 ..P WKT 2010 07 08 06 54 55 31.3200 -97.3300 251.000 122.0 91.914 2.670 -999.990 -999.990 0.919 ..P WKT 2010 07 08 06 59 55 31.3200 -97.3300 251.000 457.0 86.825 2.110 -999.990 -999.990 0.868 ..P WKT 2010 07 08 07 04 55 31.3200 -97.3300 251.000 30.0 99.136 3.020 -999.990 -999.990 0.991 ..P WKT 2010 07 08 07 09 55 31.3200 -97.3300 251.000 122.0 91.661 2.610 -999.990 -999.990 0.917 ..P WKT 2010 07 08 07 14 55 31.3200 -97.3300 251.000 457.0 84.325 2.450 -999.990 -999.990 0.843 ..P WKT 2010 07 08 07 24 55 31.3200 -97.3300 251.000 30.0 88.921 2.250 -999.990 -999.990 0.889 ..P WKT 2010 07 08 07 29 55 31.3200 -97.3300 251.000 122.0 93.835 3.420 -999.990 -999.990 0.938 ..P WKT 2010 07 08 07 34 55 31.3200 -97.3300 251.000 457.0 90.890 2.980 -999.990 -999.990 0.909 ..P WKT 2010 07 08 07 39 55 31.3200 -97.3300 251.000 30.0 97.628 4.070 -999.990 -999.990 0.976 ..P WKT 2010 07 08 07 44 55 31.3200 -97.3300 251.000 122.0 99.455 4.710 -999.990 -999.990 0.995 ..P WKT 2010 07 08 07 49 55 31.3200 -97.3300 251.000 457.0 86.827 3.060 -999.990 -999.990 0.868 ..P WKT 2010 07 08 07 59 55 31.3200 -97.3300 251.000 30.0 96.053 2.610 -999.990 -999.990 0.961 ..P WKT 2010 07 08 08 04 55 31.3200 -97.3300 251.000 122.0 93.209 3.660 -999.990 -999.990 0.932 ..P WKT 2010 07 08 08 09 55 31.3200 -97.3300 251.000 457.0 81.945 3.980 -999.990 -999.990 0.819 ..P WKT 2010 07 08 08 14 55 31.3200 -97.3300 251.000 30.0 85.836 3.930 -999.990 -999.990 0.858 ..P WKT 2010 07 08 08 19 55 31.3200 -97.3300 251.000 122.0 93.095 3.390 -999.990 -999.990 0.931 ..P WKT 2010 07 08 08 24 55 31.3200 -97.3300 251.000 457.0 83.234 2.110 -999.990 -999.990 0.832 ..P WKT 2010 07 08 08 34 55 31.3200 -97.3300 251.000 30.0 86.166 1.880 -999.990 -999.990 0.862 ..P WKT 2010 07 08 08 39 55 31.3200 -97.3300 251.000 122.0 91.100 3.610 -999.990 -999.990 0.911 ..P WKT 2010 07 08 08 44 55 31.3200 -97.3300 251.000 457.0 93.226 3.390 -999.990 -999.990 0.932 ..P WKT 2010 07 08 08 49 55 31.3200 -97.3300 251.000 30.0 92.266 3.420 -999.990 -999.990 0.923 ..P WKT 2010 07 08 08 54 55 31.3200 -97.3300 251.000 122.0 92.429 3.000 -999.990 -999.990 0.924 ..P WKT 2010 07 08 08 59 55 31.3200 -97.3300 251.000 457.0 90.908 3.670 -999.990 -999.990 0.909 ..P WKT 2010 07 08 09 09 55 31.3200 -97.3300 251.000 30.0 83.334 3.430 -999.990 -999.990 0.833 ..P WKT 2010 07 08 09 14 55 31.3200 -97.3300 251.000 122.0 91.596 2.930 -999.990 -999.990 0.916 ..P WKT 2010 07 08 09 19 55 31.3200 -97.3300 251.000 457.0 80.774 3.650 -999.990 -999.990 0.808 ..P WKT 2010 07 08 09 24 55 31.3200 -97.3300 251.000 30.0 90.719 3.780 -999.990 -999.990 0.907 ..P WKT 2010 07 08 09 29 55 31.3200 -97.3300 251.000 122.0 92.245 3.040 -999.990 -999.990 0.922 ..P WKT 2010 07 08 09 34 55 31.3200 -97.3300 251.000 457.0 79.176 2.770 -999.990 -999.990 0.792 ..P WKT 2010 07 08 09 44 55 31.3200 -97.3300 251.000 30.0 84.674 3.000 -999.990 -999.990 0.847 ..P WKT 2010 07 08 09 49 55 31.3200 -97.3300 251.000 122.0 87.804 3.600 -999.990 -999.990 0.878 ..P WKT 2010 07 08 09 54 55 31.3200 -97.3300 251.000 457.0 81.952 3.500 -999.990 -999.990 0.820 ..P WKT 2010 07 08 09 59 55 31.3200 -97.3300 251.000 30.0 88.449 3.260 -999.990 -999.990 0.884 ..P WKT 2010 07 08 10 04 55 31.3200 -97.3300 251.000 122.0 93.543 2.940 -999.990 -999.990 0.935 ..P WKT 2010 07 08 10 09 55 31.3200 -97.3300 251.000 457.0 85.868 3.490 -999.990 -999.990 0.859 ..P WKT 2010 07 08 10 19 55 31.3200 -97.3300 251.000 30.0 93.289 2.780 -999.990 -999.990 0.933 ..P WKT 2010 07 08 10 24 55 31.3200 -97.3300 251.000 122.0 94.635 2.200 -999.990 -999.990 0.946 ..P WKT 2010 07 08 10 29 55 31.3200 -97.3300 251.000 457.0 83.772 2.250 -999.990 -999.990 0.838 ..P WKT 2010 07 08 10 34 55 31.3200 -97.3300 251.000 30.0 95.220 2.520 -999.990 -999.990 0.952 ..P WKT 2010 07 08 10 39 55 31.3200 -97.3300 251.000 122.0 98.390 2.300 -999.990 -999.990 0.984 ..P WKT 2010 07 08 10 44 55 31.3200 -97.3300 251.000 457.0 88.931 2.620 -999.990 -999.990 0.889 ..P WKT 2010 07 08 10 54 55 31.3200 -97.3300 251.000 30.0 93.867 3.930 -999.990 -999.990 0.939 ..P WKT 2010 07 08 10 59 55 31.3200 -97.3300 251.000 122.0 90.020 4.400 -999.990 -999.990 0.900 ..P WKT 2010 07 08 11 04 55 31.3200 -97.3300 251.000 457.0 88.839 2.790 -999.990 -999.990 0.888 ..P WKT 2010 07 08 11 09 55 31.3200 -97.3300 251.000 30.0 97.200 3.410 -999.990 -999.990 0.972 ..P WKT 2010 07 08 11 14 55 31.3200 -97.3300 251.000 122.0 97.003 2.250 -999.990 -999.990 0.970 ..P WKT 2010 07 08 11 19 55 31.3200 -97.3300 251.000 457.0 94.278 2.180 -999.990 -999.990 0.943 ..P WKT 2010 07 08 11 29 55 31.3200 -97.3300 251.000 30.0 93.890 2.330 -999.990 -999.990 0.939 ..P WKT 2010 07 08 11 34 55 31.3200 -97.3300 251.000 122.0 99.592 2.150 -999.990 -999.990 0.996 ..P WKT 2010 07 08 11 39 55 31.3200 -97.3300 251.000 457.0 90.281 2.630 -999.990 -999.990 0.903 ..P WKT 2010 07 08 11 44 55 31.3200 -97.3300 251.000 30.0 93.318 3.230 -999.990 -999.990 0.933 ..P WKT 2010 07 08 11 49 55 31.3200 -97.3300 251.000 122.0 93.969 4.360 -999.990 -999.990 0.940 ..P WKT 2010 07 08 12 09 55 31.3200 -97.3300 251.000 457.0 88.847 2.540 -999.990 -999.990 0.888 ..P WKT 2010 07 08 12 10 25 31.3200 -97.3300 251.000 457.0 83.794 2.870 -999.990 -999.990 0.838 ..P WKT 2010 07 08 12 10 55 31.3200 -97.3300 251.000 457.0 87.720 2.350 -999.990 -999.990 0.877 ..P WKT 2010 07 08 12 11 25 31.3200 -97.3300 251.000 457.0 91.647 3.270 -999.990 -999.990 0.916 ..P WKT 2010 07 08 12 11 55 31.3200 -97.3300 251.000 457.0 89.119 2.230 -999.990 -999.990 0.891 ..P WKT 2010 07 08 12 12 25 31.3200 -97.3300 251.000 457.0 92.484 2.550 -999.990 -999.990 0.925 ..P WKT 2010 07 08 12 12 55 31.3200 -97.3300 251.000 457.0 89.396 3.070 -999.990 -999.990 0.894 ..P WKT 2010 07 08 12 13 25 31.3200 -97.3300 251.000 457.0 87.150 3.370 -999.990 -999.990 0.872 ..P WKT 2010 07 08 12 13 55 31.3200 -97.3300 251.000 457.0 87.708 2.390 -999.990 -999.990 0.877 ..P WKT 2010 07 08 12 14 25 31.3200 -97.3300 251.000 457.0 86.584 2.250 -999.990 -999.990 0.866 ..P WKT 2010 07 08 12 14 55 31.3200 -97.3300 251.000 457.0 86.862 2.300 -999.990 -999.990 0.869 ..P WKT 2010 07 08 12 19 55 31.3200 -97.3300 251.000 30.0 91.892 2.990 -999.990 -999.990 0.919 ..P WKT 2010 07 08 12 24 55 31.3200 -97.3300 251.000 122.0 94.678 3.200 -999.990 -999.990 0.947 ..P WKT 2010 07 08 12 29 55 31.3200 -97.3300 251.000 457.0 85.401 2.480 -999.990 -999.990 0.854 ..P WKT 2010 07 08 12 34 55 31.3200 -97.3300 251.000 30.0 94.076 3.420 -999.990 -999.990 0.941 ..P WKT 2010 07 08 12 39 55 31.3200 -97.3300 251.000 122.0 94.896 2.790 -999.990 -999.990 0.949 ..P WKT 2010 07 08 12 44 55 31.3200 -97.3300 251.000 457.0 93.754 5.480 -999.990 -999.990 0.938 ..P WKT 2010 07 08 12 54 55 31.3200 -97.3300 251.000 30.0 95.195 2.590 -999.990 -999.990 0.952 ..P WKT 2010 07 08 12 59 55 31.3200 -97.3300 251.000 122.0 98.619 3.700 -999.990 -999.990 0.986 ..P WKT 2010 07 08 13 04 55 31.3200 -97.3300 251.000 457.0 86.903 4.220 -999.990 -999.990 0.869 ..P WKT 2010 07 08 13 09 55 31.3200 -97.3300 251.000 30.0 99.298 3.260 -999.990 -999.990 0.993 ..P WKT 2010 07 08 13 14 55 31.3200 -97.3300 251.000 122.0 92.630 3.030 -999.990 -999.990 0.926 ..P WKT 2010 07 08 13 19 55 31.3200 -97.3300 251.000 457.0 92.970 1.950 -999.990 -999.990 0.930 ..P WKT 2010 07 08 13 29 55 31.3200 -97.3300 251.000 30.0 96.792 3.490 -999.990 -999.990 0.968 ..P WKT 2010 07 08 13 34 55 31.3200 -97.3300 251.000 122.0 100.554 2.790 -999.990 -999.990 1.006 ..P WKT 2010 07 08 13 39 55 31.3200 -97.3300 251.000 457.0 94.509 3.180 -999.990 -999.990 0.945 ..P WKT 2010 07 08 13 44 55 31.3200 -97.3300 251.000 30.0 97.991 3.880 -999.990 -999.990 0.980 ..P WKT 2010 07 08 13 49 55 31.3200 -97.3300 251.000 122.0 105.954 5.200 -999.990 -999.990 1.060 ..P WKT 2010 07 08 13 54 55 31.3200 -97.3300 251.000 457.0 87.865 4.120 -999.990 -999.990 0.879 ..P WKT 2010 07 08 14 04 55 31.3200 -97.3300 251.000 30.0 100.068 3.420 -999.990 -999.990 1.001 ..P WKT 2010 07 08 14 09 55 31.3200 -97.3300 251.000 122.0 107.808 3.480 -999.990 -999.990 1.078 ..P WKT 2010 07 08 14 14 55 31.3200 -97.3300 251.000 457.0 91.886 3.570 -999.990 -999.990 0.919 ..P WKT 2010 07 08 14 19 55 31.3200 -97.3300 251.000 30.0 101.865 2.760 -999.990 -999.990 1.019 ..P WKT 2010 07 08 14 24 55 31.3200 -97.3300 251.000 122.0 111.283 3.420 -999.990 -999.990 1.113 ..P WKT 2010 07 08 14 29 55 31.3200 -97.3300 251.000 457.0 86.406 2.200 -999.990 -999.990 0.864 ..P WKT 2010 07 08 14 39 55 31.3200 -97.3300 251.000 30.0 106.039 1.870 -999.990 -999.990 1.060 ..P WKT 2010 07 08 14 44 55 31.3200 -97.3300 251.000 122.0 108.137 2.980 -999.990 -999.990 1.081 ..P WKT 2010 07 08 14 49 55 31.3200 -97.3300 251.000 457.0 91.764 3.110 -999.990 -999.990 0.918 ..P WKT 2010 07 08 14 54 55 31.3200 -97.3300 251.000 30.0 108.273 2.440 -999.990 -999.990 1.083 ..P WKT 2010 07 08 14 59 55 31.3200 -97.3300 251.000 122.0 104.634 2.040 -999.990 -999.990 1.046 ..P WKT 2010 07 08 15 04 55 31.3200 -97.3300 251.000 457.0 91.763 1.550 -999.990 -999.990 0.918 ..P WKT 2010 07 08 15 14 55 31.3200 -97.3300 251.000 30.0 98.496 1.800 -999.990 -999.990 0.985 ..P WKT 2010 07 08 15 19 55 31.3200 -97.3300 251.000 122.0 98.095 1.980 -999.990 -999.990 0.981 ..P WKT 2010 07 08 15 24 55 31.3200 -97.3300 251.000 457.0 92.521 3.050 -999.990 -999.990 0.925 ..P WKT 2010 07 08 15 29 55 31.3200 -97.3300 251.000 30.0 104.985 2.080 -999.990 -999.990 1.050 ..P WKT 2010 07 08 15 34 55 31.3200 -97.3300 251.000 122.0 104.025 2.040 -999.990 -999.990 1.040 ..P WKT 2010 07 08 15 39 55 31.3200 -97.3300 251.000 457.0 97.333 2.960 -999.990 -999.990 0.973 ..P WKT 2010 07 08 15 49 55 31.3200 -97.3300 251.000 30.0 100.387 2.060 -999.990 -999.990 1.004 ..P WKT 2010 07 08 15 54 55 31.3200 -97.3300 251.000 122.0 104.958 1.900 -999.990 -999.990 1.050 ..P WKT 2010 07 08 15 59 55 31.3200 -97.3300 251.000 457.0 95.553 2.220 -999.990 -999.990 0.956 ..P WKT 2010 07 08 16 04 55 31.3200 -97.3300 251.000 30.0 97.329 2.320 -999.990 -999.990 0.973 ..P WKT 2010 07 08 16 09 55 31.3200 -97.3300 251.000 122.0 101.621 3.600 -999.990 -999.990 1.016 ..P WKT 2010 07 08 16 14 55 31.3200 -97.3300 251.000 457.0 92.777 3.080 -999.990 -999.990 0.928 ..P WKT 2010 07 08 16 24 55 31.3200 -97.3300 251.000 30.0 104.990 4.250 -999.990 -999.990 1.050 ..P WKT 2010 07 08 16 29 55 31.3200 -97.3300 251.000 122.0 108.162 2.990 -999.990 -999.990 1.082 ..P WKT 2010 07 08 16 34 55 31.3200 -97.3300 251.000 457.0 91.778 4.150 -999.990 -999.990 0.918 ..P WKT 2010 07 08 16 39 55 31.3200 -97.3300 251.000 30.0 101.095 2.720 -999.990 -999.990 1.011 ..P WKT 2010 07 08 16 44 55 31.3200 -97.3300 251.000 122.0 112.646 2.830 -999.990 -999.990 1.126 ..P WKT 2010 07 08 16 49 55 31.3200 -97.3300 251.000 457.0 98.500 3.080 -999.990 -999.990 0.985 ..P WKT 2010 07 08 17 04 55 31.3200 -97.3300 251.000 30.0 99.953 2.410 -999.990 -999.990 1.000 ..P WKT 2010 07 08 17 09 55 31.3200 -97.3300 251.000 122.0 99.095 2.780 -999.990 -999.990 0.991 ..P WKT 2010 07 08 17 14 55 31.3200 -97.3300 251.000 457.0 97.678 3.250 -999.990 -999.990 0.977 ..P WKT 2010 07 08 17 19 55 31.3200 -97.3300 251.000 30.0 96.820 2.620 -999.990 -999.990 0.968 ..P WKT 2010 07 08 17 24 55 31.3200 -97.3300 251.000 122.0 99.033 2.450 -999.990 -999.990 0.990 ..P WKT 2010 07 08 17 29 55 31.3200 -97.3300 251.000 457.0 97.895 2.460 -999.990 -999.990 0.979 ..P WKT 2010 07 08 17 39 55 31.3200 -97.3300 251.000 30.0 101.202 3.560 -999.990 -999.990 1.012 ..P WKT 2010 07 08 17 44 55 31.3200 -97.3300 251.000 122.0 109.273 2.590 -999.990 -999.990 1.093 ..P WKT 2010 07 08 17 49 55 31.3200 -97.3300 251.000 457.0 91.813 2.500 -999.990 -999.990 0.918 ..P WKT 2010 07 08 17 54 55 31.3200 -97.3300 251.000 30.0 105.185 3.190 -999.990 -999.990 1.052 ..P WKT 2010 07 08 17 59 55 31.3200 -97.3300 251.000 122.0 90.100 2.870 -999.990 -999.990 0.901 ..P WKT 2010 07 08 18 04 55 31.3200 -97.3300 251.000 457.0 203.189 25.800 -999.990 -999.990 2.032 ..P WKT 2010 07 08 18 14 55 31.3200 -97.3300 251.000 30.0 95.856 4.700 -999.990 -999.990 0.959 ..P WKT 2010 07 08 18 19 55 31.3200 -97.3300 251.000 122.0 104.441 2.130 -999.990 -999.990 1.044 ..P WKT 2010 07 08 18 24 55 31.3200 -97.3300 251.000 457.0 102.707 3.420 -999.990 -999.990 1.027 ..P WKT 2010 07 08 18 29 55 31.3200 -97.3300 251.000 30.0 94.978 3.480 -999.990 -999.990 0.950 ..P WKT 2010 07 08 18 34 55 31.3200 -97.3300 251.000 122.0 105.512 3.420 -999.990 -999.990 1.055 ..P WKT 2010 07 08 18 39 55 31.3200 -97.3300 251.000 457.0 89.282 3.390 -999.990 -999.990 0.893 ..P WKT 2010 07 08 18 49 55 31.3200 -97.3300 251.000 30.0 101.884 3.670 -999.990 -999.990 1.019 ..P WKT 2010 07 08 18 54 55 31.3200 -97.3300 251.000 122.0 101.585 3.210 -999.990 -999.990 1.016 ..P WKT 2010 07 08 18 59 55 31.3200 -97.3300 251.000 457.0 86.933 2.240 -999.990 -999.990 0.869 ..P WKT 2010 07 08 19 04 55 31.3200 -97.3300 251.000 30.0 99.731 2.420 -999.990 -999.990 0.997 ..P WKT 2010 07 08 19 09 55 31.3200 -97.3300 251.000 122.0 102.358 4.140 -999.990 -999.990 1.024 ..P WKT 2010 07 08 19 14 55 31.3200 -97.3300 251.000 457.0 84.366 3.350 -999.990 -999.990 0.844 ..P WKT 2010 07 08 19 24 55 31.3200 -97.3300 251.000 30.0 92.008 3.190 -999.990 -999.990 0.920 ..P WKT 2010 07 08 19 29 55 31.3200 -97.3300 251.000 122.0 93.957 2.690 -999.990 -999.990 0.940 ..P WKT 2010 07 08 19 34 55 31.3200 -97.3300 251.000 457.0 81.006 2.940 -999.990 -999.990 0.810 ..P WKT 2010 07 08 19 39 55 31.3200 -97.3300 251.000 30.0 90.893 3.120 -999.990 -999.990 0.909 ..P WKT 2010 07 08 19 44 55 31.3200 -97.3300 251.000 122.0 95.905 3.430 -999.990 -999.990 0.959 ..P WKT 2010 07 08 19 49 55 31.3200 -97.3300 251.000 457.0 90.754 4.350 -999.990 -999.990 0.908 ..P WKT 2010 07 08 19 59 55 31.3200 -97.3300 251.000 30.0 90.793 3.470 -999.990 -999.990 0.908 ..P WKT 2010 07 08 20 04 55 31.3200 -97.3300 251.000 122.0 91.807 3.520 -999.990 -999.990 0.918 ..P WKT 2010 07 08 20 09 55 31.3200 -97.3300 251.000 457.0 85.583 3.570 -999.990 -999.990 0.856 ..P WKT 2010 07 08 20 14 55 31.3200 -97.3300 251.000 30.0 96.339 4.360 -999.990 -999.990 0.963 ..P WKT 2010 07 08 20 19 55 31.3200 -97.3300 251.000 122.0 94.291 4.250 -999.990 -999.990 0.943 ..P WKT 2010 07 08 20 24 55 31.3200 -97.3300 251.000 457.0 91.964 4.910 -999.990 -999.990 0.920 ..P WKT 2010 07 08 20 34 55 31.3200 -97.3300 251.000 30.0 99.119 4.830 -999.990 -999.990 0.991 ..P WKT 2010 07 08 20 39 55 31.3200 -97.3300 251.000 122.0 86.062 4.210 -999.990 -999.990 0.861 ..P WKT 2010 07 08 20 44 55 31.3200 -97.3300 251.000 457.0 90.255 3.920 -999.990 -999.990 0.903 ..P WKT 2010 07 08 20 49 55 31.3200 -97.3300 251.000 30.0 88.884 3.480 -999.990 -999.990 0.889 ..P WKT 2010 07 08 20 54 55 31.3200 -97.3300 251.000 122.0 96.692 3.440 -999.990 -999.990 0.967 ..P WKT 2010 07 08 20 59 55 31.3200 -97.3300 251.000 457.0 88.924 3.240 -999.990 -999.990 0.889 ..P WKT 2010 07 08 21 09 55 31.3200 -97.3300 251.000 30.0 97.643 3.290 -999.990 -999.990 0.976 ..P WKT 2010 07 08 21 14 55 31.3200 -97.3300 251.000 122.0 89.380 2.770 -999.990 -999.990 0.894 ..P WKT 2010 07 08 21 19 55 31.3200 -97.3300 251.000 457.0 82.788 3.790 -999.990 -999.990 0.828 ..P WKT 2010 07 08 21 24 55 31.3200 -97.3300 251.000 30.0 85.647 4.360 -999.990 -999.990 0.856 ..P WKT 2010 07 08 21 29 55 31.3200 -97.3300 251.000 122.0 94.067 4.860 -999.990 -999.990 0.941 ..P WKT 2010 07 08 21 34 55 31.3200 -97.3300 251.000 457.0 88.865 2.960 -999.990 -999.990 0.889 ..P WKT 2010 07 08 21 44 55 31.3200 -97.3300 251.000 30.0 92.993 3.270 -999.990 -999.990 0.930 ..P WKT 2010 07 08 21 49 55 31.3200 -97.3300 251.000 122.0 88.844 3.820 -999.990 -999.990 0.888 ..P WKT 2010 07 08 21 54 55 31.3200 -97.3300 251.000 457.0 83.724 5.200 -999.990 -999.990 0.837 ..P WKT 2010 07 08 21 59 55 31.3200 -97.3300 251.000 30.0 82.633 4.460 -999.990 -999.990 0.826 ..P WKT 2010 07 08 22 04 55 31.3200 -97.3300 251.000 122.0 82.236 3.890 -999.990 -999.990 0.822 ..P WKT 2010 07 08 22 09 55 31.3200 -97.3300 251.000 457.0 74.618 3.830 -999.990 -999.990 0.746 ..P WKT 2010 07 08 22 19 55 31.3200 -97.3300 251.000 30.0 78.191 4.400 -999.990 -999.990 0.782 ..P WKT 2010 07 08 22 24 55 31.3200 -97.3300 251.000 122.0 79.799 6.660 -999.990 -999.990 0.798 ..P WKT 2010 07 08 22 29 55 31.3200 -97.3300 251.000 457.0 79.601 4.890 -999.990 -999.990 0.796 ..P WKT 2010 07 08 22 34 55 31.3200 -97.3300 251.000 30.0 83.708 4.390 -999.990 -999.990 0.837 ..P WKT 2010 07 08 22 39 55 31.3200 -97.3300 251.000 122.0 83.926 4.170 -999.990 -999.990 0.839 ..P WKT 2010 07 08 22 44 55 31.3200 -97.3300 251.000 457.0 76.927 3.900 -999.990 -999.990 0.769 ..P WKT 2010 07 08 22 54 55 31.3200 -97.3300 251.000 30.0 79.725 4.320 -999.990 -999.990 0.797 ..P WKT 2010 07 08 22 59 55 31.3200 -97.3300 251.000 122.0 81.886 5.010 -999.990 -999.990 0.819 ..P WKT 2010 07 08 23 04 55 31.3200 -97.3300 251.000 457.0 77.110 4.310 -999.990 -999.990 0.771 ..P WKT 2010 07 08 23 09 55 31.3200 -97.3300 251.000 30.0 86.486 3.770 -999.990 -999.990 0.865 ..P WKT 2010 07 08 23 14 55 31.3200 -97.3300 251.000 122.0 85.178 3.760 -999.990 -999.990 0.852 ..P WKT 2010 07 08 23 19 55 31.3200 -97.3300 251.000 457.0 79.709 3.960 -999.990 -999.990 0.797 ..P WKT 2010 07 08 23 29 55 31.3200 -97.3300 251.000 30.0 97.056 3.330 -999.990 -999.990 0.971 ..P WKT 2010 07 08 23 34 55 31.3200 -97.3300 251.000 122.0 93.100 3.890 -999.990 -999.990 0.931 ..P WKT 2010 07 08 23 39 55 31.3200 -97.3300 251.000 457.0 87.897 3.080 -999.990 -999.990 0.879 ..P WKT 2010 07 08 23 44 55 31.3200 -97.3300 251.000 30.0 92.124 4.910 -999.990 -999.990 0.921 ..P WKT 2010 07 08 23 49 55 31.3200 -97.3300 251.000 122.0 93.023 4.520 -999.990 -999.990 0.930 ..P WKT 2010 07 09 00 09 55 31.3200 -97.3300 251.000 457.0 84.419 2.710 -999.990 -999.990 0.844 ..P WKT 2010 07 09 00 10 25 31.3200 -97.3300 251.000 457.0 83.475 3.020 -999.990 -999.990 0.835 ..P WKT 2010 07 09 00 10 55 31.3200 -97.3300 251.000 457.0 89.742 2.960 -999.990 -999.990 0.897 ..P WKT 2010 07 09 00 11 25 31.3200 -97.3300 251.000 457.0 87.966 2.950 -999.990 -999.990 0.880 ..P WKT 2010 07 09 00 11 55 31.3200 -97.3300 251.000 457.0 89.242 2.910 -999.990 -999.990 0.892 ..P WKT 2010 07 09 00 12 25 31.3200 -97.3300 251.000 457.0 86.634 2.710 -999.990 -999.990 0.866 ..P WKT 2010 07 09 00 12 55 31.3200 -97.3300 251.000 457.0 87.077 2.720 -999.990 -999.990 0.871 ..P WKT 2010 07 09 00 13 25 31.3200 -97.3300 251.000 457.0 84.191 2.770 -999.990 -999.990 0.842 ..P WKT 2010 07 09 00 13 55 31.3200 -97.3300 251.000 457.0 80.197 3.420 -999.990 -999.990 0.802 ..P WKT 2010 07 09 00 14 25 31.3200 -97.3300 251.000 457.0 82.582 3.050 -999.990 -999.990 0.826 ..P WKT 2010 07 09 00 14 55 31.3200 -97.3300 251.000 457.0 84.135 3.110 -999.990 -999.990 0.841 ..P WKT 2010 07 09 00 19 55 31.3200 -97.3300 251.000 30.0 99.662 3.500 -999.990 -999.990 0.997 ..P WKT 2010 07 09 00 24 55 31.3200 -97.3300 251.000 122.0 102.432 3.930 -999.990 -999.990 1.024 ..P WKT 2010 07 09 00 29 55 31.3200 -97.3300 251.000 457.0 75.790 4.570 -999.990 -999.990 0.758 ..P WKT 2010 07 09 00 34 55 31.3200 -97.3300 251.000 30.0 96.040 4.460 -999.990 -999.990 0.960 ..P WKT 2010 07 09 00 39 55 31.3200 -97.3300 251.000 122.0 101.308 3.500 -999.990 -999.990 1.013 ..P WKT 2010 07 09 00 44 55 31.3200 -97.3300 251.000 457.0 79.375 2.520 -999.990 -999.990 0.794 ..P WKT 2010 07 09 00 54 55 31.3200 -97.3300 251.000 30.0 93.630 3.630 -999.990 -999.990 0.936 ..P WKT 2010 07 09 00 59 55 31.3200 -97.3300 251.000 122.0 91.514 4.130 -999.990 -999.990 0.915 ..P WKT 2010 07 09 01 04 55 31.3200 -97.3300 251.000 457.0 76.342 4.610 -999.990 -999.990 0.763 ..P WKT 2010 07 09 01 09 55 31.3200 -97.3300 251.000 30.0 100.056 4.160 -999.990 -999.990 1.001 ..P WKT 2010 07 09 01 14 55 31.3200 -97.3300 251.000 122.0 102.383 3.050 -999.990 -999.990 1.024 ..P WKT 2010 07 09 01 19 55 31.3200 -97.3300 251.000 457.0 83.318 3.990 -999.990 -999.990 0.833 ..P WKT 2010 07 09 01 29 55 31.3200 -97.3300 251.000 30.0 101.411 3.740 -999.990 -999.990 1.014 ..P WKT 2010 07 09 01 34 55 31.3200 -97.3300 251.000 122.0 100.504 4.810 -999.990 -999.990 1.005 ..P WKT 2010 07 09 01 39 55 31.3200 -97.3300 251.000 457.0 88.478 3.700 -999.990 -999.990 0.885 ..P WKT 2010 07 09 01 44 55 31.3200 -97.3300 251.000 30.0 113.286 4.300 -999.990 -999.990 1.133 ..P WKT 2010 07 09 01 49 55 31.3200 -97.3300 251.000 122.0 96.392 3.260 -999.990 -999.990 0.964 ..P WKT 2010 07 09 01 54 55 31.3200 -97.3300 251.000 457.0 93.398 3.500 -999.990 -999.990 0.934 ..P WKT 2010 07 09 02 04 55 31.3200 -97.3300 251.000 30.0 101.615 4.810 -999.990 -999.990 1.016 ..P WKT 2010 07 09 02 09 55 31.3200 -97.3300 251.000 122.0 100.588 3.550 -999.990 -999.990 1.006 ..P WKT 2010 07 09 02 14 55 31.3200 -97.3300 251.000 457.0 95.109 3.340 -999.990 -999.990 0.951 ..P WKT 2010 07 09 02 19 55 31.3200 -97.3300 251.000 30.0 106.465 3.300 -999.990 -999.990 1.065 ..P WKT 2010 07 09 02 24 55 31.3200 -97.3300 251.000 122.0 101.124 3.430 -999.990 -999.990 1.011 ..P WKT 2010 07 09 02 29 55 31.3200 -97.3300 251.000 457.0 87.153 3.750 -999.990 -999.990 0.872 ..P WKT 2010 07 09 02 39 55 31.3200 -97.3300 251.000 30.0 103.828 3.300 -999.990 -999.990 1.038 ..P WKT 2010 07 09 02 44 55 31.3200 -97.3300 251.000 122.0 97.590 3.480 -999.990 -999.990 0.976 ..P WKT 2010 07 09 02 49 55 31.3200 -97.3300 251.000 457.0 91.349 4.560 -999.990 -999.990 0.913 ..P WKT 2010 07 09 02 54 55 31.3200 -97.3300 251.000 30.0 106.415 3.260 -999.990 -999.990 1.064 ..P WKT 2010 07 09 02 59 55 31.3200 -97.3300 251.000 122.0 102.403 2.590 -999.990 -999.990 1.024 ..P WKT 2010 07 09 03 04 55 31.3200 -97.3300 251.000 457.0 98.251 3.420 -999.990 -999.990 0.983 ..P WKT 2010 07 09 03 14 55 31.3200 -97.3300 251.000 30.0 112.396 4.150 -999.990 -999.990 1.124 ..P WKT 2010 07 09 03 19 55 31.3200 -97.3300 251.000 122.0 98.647 2.700 -999.990 -999.990 0.986 ..P WKT 2010 07 09 03 24 55 31.3200 -97.3300 251.000 457.0 96.184 3.480 -999.990 -999.990 0.962 ..P WKT 2010 07 09 03 29 55 31.3200 -97.3300 251.000 30.0 116.163 2.940 -999.990 -999.990 1.162 ..P WKT 2010 07 09 03 34 55 31.3200 -97.3300 251.000 122.0 108.265 3.550 -999.990 -999.990 1.083 ..P WKT 2010 07 09 03 39 55 31.3200 -97.3300 251.000 457.0 102.177 3.470 -999.990 -999.990 1.022 ..P WKT 2010 07 09 03 49 55 31.3200 -97.3300 251.000 30.0 118.588 4.000 -999.990 -999.990 1.186 ..P WKT 2010 07 09 03 54 55 31.3200 -97.3300 251.000 122.0 103.991 3.630 -999.990 -999.990 1.040 ..P WKT 2010 07 09 03 59 55 31.3200 -97.3300 251.000 457.0 94.969 3.270 -999.990 -999.990 0.950 ..P WKT 2010 07 09 04 04 55 31.3200 -97.3300 251.000 30.0 127.524 3.840 -999.990 -999.990 1.275 ..P WKT 2010 07 09 04 09 55 31.3200 -97.3300 251.000 122.0 101.201 3.920 -999.990 -999.990 1.012 ..P WKT 2010 07 09 04 14 55 31.3200 -97.3300 251.000 457.0 94.687 2.920 -999.990 -999.990 0.947 ..P WKT 2010 07 09 04 24 55 31.3200 -97.3300 251.000 30.0 127.284 3.050 -999.990 -999.990 1.273 ..P WKT 2010 07 09 04 29 55 31.3200 -97.3300 251.000 122.0 103.301 2.870 -999.990 -999.990 1.033 ..P WKT 2010 07 09 04 34 55 31.3200 -97.3300 251.000 457.0 105.003 2.800 -999.990 -999.990 1.050 ..P WKT 2010 07 09 04 39 55 31.3200 -97.3300 251.000 30.0 141.338 3.840 -999.990 -999.990 1.413 ..P WKT 2010 07 09 04 44 55 31.3200 -97.3300 251.000 122.0 110.364 2.660 -999.990 -999.990 1.104 ..P WKT 2010 07 09 04 49 55 31.3200 -97.3300 251.000 457.0 97.261 2.690 -999.990 -999.990 0.973 ..P WKT 2010 07 09 05 04 55 31.3200 -97.3300 251.000 30.0 133.601 2.650 -999.990 -999.990 1.336 ..P WKT 2010 07 09 05 09 55 31.3200 -97.3300 251.000 122.0 104.528 2.800 -999.990 -999.990 1.045 ..P WKT 2010 07 09 05 14 55 31.3200 -97.3300 251.000 457.0 96.692 2.680 -999.990 -999.990 0.967 ..P WKT 2010 07 09 05 19 55 31.3200 -97.3300 251.000 30.0 130.793 2.670 -999.990 -999.990 1.308 ..P WKT 2010 07 09 05 24 55 31.3200 -97.3300 251.000 122.0 102.826 3.980 -999.990 -999.990 1.028 ..P WKT 2010 07 09 05 29 55 31.3200 -97.3300 251.000 457.0 101.139 2.950 -999.990 -999.990 1.011 ..P WKT 2010 07 09 05 39 55 31.3200 -97.3300 251.000 30.0 123.836 3.120 -999.990 -999.990 1.238 ..P WKT 2010 07 09 05 44 55 31.3200 -97.3300 251.000 122.0 102.903 2.980 -999.990 -999.990 1.029 ..P WKT 2010 07 09 05 49 55 31.3200 -97.3300 251.000 457.0 93.296 3.930 -999.990 -999.990 0.933 ..P WKT 2010 07 09 05 54 55 31.3200 -97.3300 251.000 30.0 117.128 3.060 -999.990 -999.990 1.171 ..P WKT 2010 07 09 05 59 55 31.3200 -97.3300 251.000 122.0 104.443 3.550 -999.990 -999.990 1.044 ..P WKT 2010 07 09 06 04 55 31.3200 -97.3300 251.000 457.0 96.232 2.400 -999.990 -999.990 0.962 ..P WKT 2010 07 09 06 14 55 31.3200 -97.3300 251.000 30.0 126.302 3.270 -999.990 -999.990 1.263 ..P WKT 2010 07 09 06 19 55 31.3200 -97.3300 251.000 122.0 109.711 3.350 -999.990 -999.990 1.097 ..P WKT 2010 07 09 06 24 55 31.3200 -97.3300 251.000 457.0 89.474 4.680 -999.990 -999.990 0.895 ..P WKT 2010 07 09 06 29 55 31.3200 -97.3300 251.000 30.0 120.350 3.780 -999.990 -999.990 1.204 ..P WKT 2010 07 09 06 34 55 31.3200 -97.3300 251.000 122.0 108.373 3.520 -999.990 -999.990 1.084 ..P WKT 2010 07 09 06 39 55 31.3200 -97.3300 251.000 457.0 94.292 3.390 -999.990 -999.990 0.943 ..P WKT 2010 07 09 06 49 55 31.3200 -97.3300 251.000 30.0 117.243 3.630 -999.990 -999.990 1.172 ..P WKT 2010 07 09 06 54 55 31.3200 -97.3300 251.000 122.0 109.023 3.370 -999.990 -999.990 1.090 ..P WKT 2010 07 09 06 59 55 31.3200 -97.3300 251.000 457.0 92.112 2.850 -999.990 -999.990 0.921 ..P WKT 2010 07 09 07 04 55 31.3200 -97.3300 251.000 30.0 110.661 2.960 -999.990 -999.990 1.107 ..P WKT 2010 07 09 07 09 55 31.3200 -97.3300 251.000 122.0 110.148 6.080 -999.990 -999.990 1.101 ..P WKT 2010 07 09 07 14 55 31.3200 -97.3300 251.000 457.0 90.145 2.820 -999.990 -999.990 0.901 ..P WKT 2010 07 09 07 24 55 31.3200 -97.3300 251.000 30.0 110.311 2.960 -999.990 -999.990 1.103 ..P WKT 2010 07 09 07 29 55 31.3200 -97.3300 251.000 122.0 112.062 2.740 -999.990 -999.990 1.121 ..P WKT 2010 07 09 07 34 55 31.3200 -97.3300 251.000 457.0 86.458 2.850 -999.990 -999.990 0.865 ..P WKT 2010 07 09 07 39 55 31.3200 -97.3300 251.000 30.0 113.882 3.940 -999.990 -999.990 1.139 ..P WKT 2010 07 09 07 44 55 31.3200 -97.3300 251.000 122.0 102.865 3.110 -999.990 -999.990 1.029 ..P WKT 2010 07 09 07 49 55 31.3200 -97.3300 251.000 457.0 80.056 4.030 -999.990 -999.990 0.801 ..P WKT 2010 07 09 07 59 55 31.3200 -97.3300 251.000 30.0 113.133 5.110 -999.990 -999.990 1.131 ..P WKT 2010 07 09 08 04 55 31.3200 -97.3300 251.000 122.0 106.422 2.900 -999.990 -999.990 1.064 ..P WKT 2010 07 09 08 09 55 31.3200 -97.3300 251.000 457.0 90.161 3.540 -999.990 -999.990 0.902 ..P WKT 2010 07 09 08 14 55 31.3200 -97.3300 251.000 30.0 113.779 3.430 -999.990 -999.990 1.138 ..P WKT 2010 07 09 08 19 55 31.3200 -97.3300 251.000 122.0 107.347 2.580 -999.990 -999.990 1.073 ..P WKT 2010 07 09 08 24 55 31.3200 -97.3300 251.000 457.0 93.890 2.210 -999.990 -999.990 0.939 ..P WKT 2010 07 09 08 34 55 31.3200 -97.3300 251.000 30.0 120.516 3.190 -999.990 -999.990 1.205 ..P WKT 2010 07 09 08 39 55 31.3200 -97.3300 251.000 122.0 118.458 3.630 -999.990 -999.990 1.185 ..P WKT 2010 07 09 08 44 55 31.3200 -97.3300 251.000 457.0 89.696 3.510 -999.990 -999.990 0.897 ..P WKT 2010 07 09 08 49 55 31.3200 -97.3300 251.000 30.0 118.275 2.430 -999.990 -999.990 1.183 ..P WKT 2010 07 09 08 54 55 31.3200 -97.3300 251.000 122.0 113.122 2.150 -999.990 -999.990 1.131 ..P WKT 2010 07 09 08 59 55 31.3200 -97.3300 251.000 457.0 88.847 1.990 -999.990 -999.990 0.888 ..P WKT 2010 07 09 09 09 55 31.3200 -97.3300 251.000 30.0 117.265 1.920 -999.990 -999.990 1.173 ..P WKT 2010 07 09 09 14 55 31.3200 -97.3300 251.000 122.0 110.623 2.380 -999.990 -999.990 1.106 ..P WKT 2010 07 09 09 19 55 31.3200 -97.3300 251.000 457.0 90.755 2.590 -999.990 -999.990 0.908 ..P WKT 2010 07 09 09 24 55 31.3200 -97.3300 251.000 30.0 108.870 2.920 -999.990 -999.990 1.089 ..P WKT 2010 07 09 09 29 55 31.3200 -97.3300 251.000 122.0 104.616 3.090 -999.990 -999.990 1.046 ..P WKT 2010 07 09 09 34 55 31.3200 -97.3300 251.000 457.0 87.695 4.430 -999.990 -999.990 0.877 ..P WKT 2010 07 09 09 44 55 31.3200 -97.3300 251.000 30.0 107.754 3.890 -999.990 -999.990 1.078 ..P WKT 2010 07 09 09 49 55 31.3200 -97.3300 251.000 122.0 104.202 2.990 -999.990 -999.990 1.042 ..P WKT 2010 07 09 09 54 55 31.3200 -97.3300 251.000 457.0 84.315 3.500 -999.990 -999.990 0.843 ..P WKT 2010 07 09 09 59 55 31.3200 -97.3300 251.000 30.0 109.768 4.590 -999.990 -999.990 1.098 ..P WKT 2010 07 09 10 04 55 31.3200 -97.3300 251.000 122.0 103.539 4.370 -999.990 -999.990 1.035 ..P WKT 2010 07 09 10 09 55 31.3200 -97.3300 251.000 457.0 88.152 3.080 -999.990 -999.990 0.882 ..P WKT 2010 07 09 10 19 55 31.3200 -97.3300 251.000 30.0 112.456 4.660 -999.990 -999.990 1.125 ..P WKT 2010 07 09 10 24 55 31.3200 -97.3300 251.000 122.0 100.729 3.400 -999.990 -999.990 1.007 ..P WKT 2010 07 09 10 29 55 31.3200 -97.3300 251.000 457.0 84.347 3.080 -999.990 -999.990 0.843 ..P WKT 2010 07 09 10 34 55 31.3200 -97.3300 251.000 30.0 107.145 3.850 -999.990 -999.990 1.071 ..P WKT 2010 07 09 10 39 55 31.3200 -97.3300 251.000 122.0 102.742 3.590 -999.990 -999.990 1.027 ..P WKT 2010 07 09 10 44 55 31.3200 -97.3300 251.000 457.0 84.239 3.370 -999.990 -999.990 0.842 ..P WKT 2010 07 09 10 54 55 31.3200 -97.3300 251.000 30.0 102.763 3.110 -999.990 -999.990 1.028 ..P WKT 2010 07 09 10 59 55 31.3200 -97.3300 251.000 122.0 97.349 3.350 -999.990 -999.990 0.973 ..P WKT 2010 07 09 11 04 55 31.3200 -97.3300 251.000 457.0 80.508 3.510 -999.990 -999.990 0.805 ..P WKT 2010 07 09 11 09 55 31.3200 -97.3300 251.000 30.0 106.411 3.330 -999.990 -999.990 1.064 ..P WKT 2010 07 09 11 14 55 31.3200 -97.3300 251.000 122.0 98.314 2.760 -999.990 -999.990 0.983 ..P WKT 2010 07 09 11 19 55 31.3200 -97.3300 251.000 457.0 78.928 2.780 -999.990 -999.990 0.789 ..P WKT 2010 07 09 11 29 55 31.3200 -97.3300 251.000 30.0 116.300 3.130 -999.990 -999.990 1.163 ..P WKT 2010 07 09 11 34 55 31.3200 -97.3300 251.000 122.0 104.470 3.030 -999.990 -999.990 1.045 ..P WKT 2010 07 09 11 39 55 31.3200 -97.3300 251.000 457.0 93.767 3.370 -999.990 -999.990 0.938 ..P WKT 2010 07 09 11 44 55 31.3200 -97.3300 251.000 30.0 121.470 3.270 -999.990 -999.990 1.215 ..P WKT 2010 07 09 11 49 55 31.3200 -97.3300 251.000 122.0 103.422 2.680 -999.990 -999.990 1.034 ..P WKT 2010 07 09 12 09 55 31.3200 -97.3300 251.000 457.0 82.433 2.730 -999.990 -999.990 0.824 ..P WKT 2010 07 09 12 10 25 31.3200 -97.3300 251.000 457.0 78.527 3.380 -999.990 -999.990 0.785 ..P WKT 2010 07 09 12 10 55 31.3200 -97.3300 251.000 457.0 87.049 2.940 -999.990 -999.990 0.870 ..P WKT 2010 07 09 12 11 25 31.3200 -97.3300 251.000 457.0 83.142 3.460 -999.990 -999.990 0.831 ..P WKT 2010 07 09 12 11 55 31.3200 -97.3300 251.000 457.0 77.542 3.570 -999.990 -999.990 0.775 ..P WKT 2010 07 09 12 12 25 31.3200 -97.3300 251.000 457.0 86.628 2.990 -999.990 -999.990 0.866 ..P WKT 2010 07 09 12 12 55 31.3200 -97.3300 251.000 457.0 82.439 3.880 -999.990 -999.990 0.824 ..P WKT 2010 07 09 12 13 25 31.3200 -97.3300 251.000 457.0 85.313 3.870 -999.990 -999.990 0.853 ..P WKT 2010 07 09 12 13 55 31.3200 -97.3300 251.000 457.0 86.208 2.950 -999.990 -999.990 0.862 ..P WKT 2010 07 09 12 14 25 31.3200 -97.3300 251.000 457.0 87.104 2.590 -999.990 -999.990 0.871 ..P WKT 2010 07 09 12 14 55 31.3200 -97.3300 251.000 457.0 86.587 2.630 -999.990 -999.990 0.866 ..P WKT 2010 07 09 12 19 55 31.3200 -97.3300 251.000 30.0 113.052 3.320 -999.990 -999.990 1.131 ..P WKT 2010 07 09 12 24 55 31.3200 -97.3300 251.000 122.0 105.341 3.710 -999.990 -999.990 1.053 ..P WKT 2010 07 09 12 29 55 31.3200 -97.3300 251.000 457.0 80.406 3.650 -999.990 -999.990 0.804 ..P WKT 2010 07 09 12 34 55 31.3200 -97.3300 251.000 30.0 115.899 2.770 -999.990 -999.990 1.159 ..P WKT 2010 07 09 12 39 55 31.3200 -97.3300 251.000 122.0 104.803 2.320 -999.990 -999.990 1.048 ..P WKT 2010 07 09 12 44 55 31.3200 -97.3300 251.000 457.0 96.530 1.900 -999.990 -999.990 0.965 ..P WKT 2010 07 09 12 54 55 31.3200 -97.3300 251.000 30.0 109.730 2.700 -999.990 -999.990 1.097 ..P WKT 2010 07 09 12 59 55 31.3200 -97.3300 251.000 122.0 107.772 2.990 -999.990 -999.990 1.078 ..P WKT 2010 07 09 13 04 55 31.3200 -97.3300 251.000 457.0 81.546 2.780 -999.990 -999.990 0.815 ..P WKT 2010 07 09 13 09 55 31.3200 -97.3300 251.000 30.0 112.604 3.750 -999.990 -999.990 1.126 ..P WKT 2010 07 09 13 14 55 31.3200 -97.3300 251.000 122.0 100.772 3.350 -999.990 -999.990 1.008 ..P WKT 2010 07 09 13 19 55 31.3200 -97.3300 251.000 457.0 86.402 3.460 -999.990 -999.990 0.864 ..P WKT 2010 07 09 13 29 55 31.3200 -97.3300 251.000 30.0 97.744 2.440 -999.990 -999.990 0.977 ..P WKT 2010 07 09 13 34 55 31.3200 -97.3300 251.000 122.0 104.410 3.560 -999.990 -999.990 1.044 ..P WKT 2010 07 09 13 39 55 31.3200 -97.3300 251.000 457.0 93.872 3.860 -999.990 -999.990 0.939 ..P WKT 2010 07 09 13 44 55 31.3200 -97.3300 251.000 30.0 110.266 4.650 -999.990 -999.990 1.103 ..P WKT 2010 07 09 13 49 55 31.3200 -97.3300 251.000 122.0 107.201 3.590 -999.990 -999.990 1.072 ..P WKT 2010 07 09 13 54 55 31.3200 -97.3300 251.000 457.0 93.284 2.520 -999.990 -999.990 0.933 ..P WKT 2010 07 09 14 04 55 31.3200 -97.3300 251.000 30.0 106.872 2.430 -999.990 -999.990 1.069 ..P WKT 2010 07 09 14 09 55 31.3200 -97.3300 251.000 122.0 106.749 3.490 -999.990 -999.990 1.067 ..P WKT 2010 07 09 14 14 55 31.3200 -97.3300 251.000 457.0 92.675 4.890 -999.990 -999.990 0.927 ..P WKT 2010 07 09 14 19 55 31.3200 -97.3300 251.000 30.0 98.612 3.450 -999.990 -999.990 0.986 ..P WKT 2010 07 09 14 24 55 31.3200 -97.3300 251.000 122.0 108.492 3.310 -999.990 -999.990 1.085 ..P WKT 2010 07 09 14 29 55 31.3200 -97.3300 251.000 457.0 92.732 3.700 -999.990 -999.990 0.927 ..P WKT 2010 07 09 14 39 55 31.3200 -97.3300 251.000 30.0 99.470 4.070 -999.990 -999.990 0.995 ..P WKT 2010 07 09 14 44 55 31.3200 -97.3300 251.000 122.0 106.751 3.340 -999.990 -999.990 1.068 ..P WKT 2010 07 09 14 49 55 31.3200 -97.3300 251.000 457.0 92.767 4.350 -999.990 -999.990 0.928 ..P WKT 2010 07 09 14 54 55 31.3200 -97.3300 251.000 30.0 102.582 3.590 -999.990 -999.990 1.026 ..P WKT 2010 07 09 14 59 55 31.3200 -97.3300 251.000 122.0 103.666 2.440 -999.990 -999.990 1.037 ..P WKT 2010 07 09 15 04 55 31.3200 -97.3300 251.000 457.0 95.318 2.100 -999.990 -999.990 0.953 ..P WKT 2010 07 09 15 14 55 31.3200 -97.3300 251.000 30.0 101.830 2.180 -999.990 -999.990 1.018 ..P WKT 2010 07 09 15 19 55 31.3200 -97.3300 251.000 122.0 103.175 3.320 -999.990 -999.990 1.032 ..P WKT 2010 07 09 15 24 55 31.3200 -97.3300 251.000 457.0 95.091 3.830 -999.990 -999.990 0.951 ..P WKT 2010 07 09 15 29 55 31.3200 -97.3300 251.000 30.0 102.205 2.130 -999.990 -999.990 1.022 ..P WKT 2010 07 09 15 34 55 31.3200 -97.3300 251.000 122.0 102.846 1.900 -999.990 -999.990 1.028 ..P WKT 2010 07 09 15 39 55 31.3200 -97.3300 251.000 457.0 93.358 2.860 -999.990 -999.990 0.934 ..P WKT 2010 07 09 15 49 55 31.3200 -97.3300 251.000 30.0 99.002 2.590 -999.990 -999.990 0.990 ..P WKT 2010 07 09 15 54 55 31.3200 -97.3300 251.000 122.0 101.471 2.920 -999.990 -999.990 1.015 ..P WKT 2010 07 09 15 59 55 31.3200 -97.3300 251.000 457.0 89.597 2.110 -999.990 -999.990 0.896 ..P WKT 2010 07 09 16 04 55 31.3200 -97.3300 251.000 30.0 98.816 2.890 -999.990 -999.990 0.988 ..P WKT 2010 07 09 16 09 55 31.3200 -97.3300 251.000 122.0 98.191 2.290 -999.990 -999.990 0.982 ..P WKT 2010 07 09 16 14 55 31.3200 -97.3300 251.000 457.0 86.320 3.980 -999.990 -999.990 0.863 ..P WKT 2010 07 09 16 24 55 31.3200 -97.3300 251.000 30.0 97.202 2.740 -999.990 -999.990 0.972 ..P WKT 2010 07 09 16 29 55 31.3200 -97.3300 251.000 122.0 98.586 2.250 -999.990 -999.990 0.986 ..P WKT 2010 07 09 16 34 55 31.3200 -97.3300 251.000 457.0 88.165 2.300 -999.990 -999.990 0.882 ..P WKT 2010 07 09 16 39 55 31.3200 -97.3300 251.000 30.0 94.608 2.320 -999.990 -999.990 0.946 ..P WKT 2010 07 09 16 44 55 31.3200 -97.3300 251.000 122.0 99.645 4.220 -999.990 -999.990 0.996 ..P WKT 2010 07 09 16 49 55 31.3200 -97.3300 251.000 457.0 94.846 3.260 -999.990 -999.990 0.948 ..P WKT 2010 07 09 17 04 55 31.3200 -97.3300 251.000 30.0 98.996 2.890 -999.990 -999.990 0.990 ..P WKT 2010 07 09 17 09 55 31.3200 -97.3300 251.000 122.0 102.625 2.610 -999.990 -999.990 1.026 ..P WKT 2010 07 09 17 14 55 31.3200 -97.3300 251.000 457.0 99.232 3.250 -999.990 -999.990 0.992 ..P WKT 2010 07 09 17 19 55 31.3200 -97.3300 251.000 30.0 98.930 2.960 -999.990 -999.990 0.989 ..P WKT 2010 07 09 17 24 55 31.3200 -97.3300 251.000 122.0 105.787 3.990 -999.990 -999.990 1.058 ..P WKT 2010 07 09 17 29 55 31.3200 -97.3300 251.000 457.0 92.991 2.980 -999.990 -999.990 0.930 ..P WKT 2010 07 09 17 39 55 31.3200 -97.3300 251.000 30.0 98.942 3.900 -999.990 -999.990 0.989 ..P WKT 2010 07 09 17 44 55 31.3200 -97.3300 251.000 122.0 104.494 3.690 -999.990 -999.990 1.045 ..P WKT 2010 07 09 17 49 55 31.3200 -97.3300 251.000 457.0 95.170 3.490 -999.990 -999.990 0.952 ..P WKT 2010 07 09 17 54 55 31.3200 -97.3300 251.000 30.0 106.193 3.170 -999.990 -999.990 1.062 ..P WKT 2010 07 09 17 59 55 31.3200 -97.3300 251.000 122.0 103.184 3.660 -999.990 -999.990 1.032 ..P WKT 2010 07 09 18 04 55 31.3200 -97.3300 251.000 457.0 100.597 3.180 -999.990 -999.990 1.006 ..P WKT 2010 07 09 18 14 55 31.3200 -97.3300 251.000 30.0 104.660 3.060 -999.990 -999.990 1.047 ..P WKT 2010 07 09 18 19 55 31.3200 -97.3300 251.000 122.0 108.926 2.980 -999.990 -999.990 1.089 ..P WKT 2010 07 09 18 24 55 31.3200 -97.3300 251.000 457.0 98.325 3.720 -999.990 -999.990 0.983 ..P WKT 2010 07 09 18 29 55 31.3200 -97.3300 251.000 30.0 103.151 3.620 -999.990 -999.990 1.032 ..P WKT 2010 07 09 18 34 55 31.3200 -97.3300 251.000 122.0 106.154 2.990 -999.990 -999.990 1.062 ..P WKT 2010 07 09 18 39 55 31.3200 -97.3300 251.000 457.0 92.613 3.060 -999.990 -999.990 0.926 ..P WKT 2010 07 09 18 49 55 31.3200 -97.3300 251.000 30.0 95.975 2.930 -999.990 -999.990 0.960 ..P WKT 2010 07 09 18 54 55 31.3200 -97.3300 251.000 122.0 105.723 2.690 -999.990 -999.990 1.057 ..P WKT 2010 07 09 18 59 55 31.3200 -97.3300 251.000 457.0 99.915 5.350 -999.990 -999.990 0.999 ..P WKT 2010 07 09 19 04 55 31.3200 -97.3300 251.000 30.0 87.663 3.530 -999.990 -999.990 0.877 ..P WKT 2010 07 09 19 09 55 31.3200 -97.3300 251.000 122.0 96.429 3.460 -999.990 -999.990 0.964 ..P WKT 2010 07 09 19 14 55 31.3200 -97.3300 251.000 457.0 90.623 3.380 -999.990 -999.990 0.906 ..P WKT 2010 07 09 19 24 55 31.3200 -97.3300 251.000 30.0 92.462 1.720 -999.990 -999.990 0.925 ..P WKT 2010 07 09 19 29 55 31.3200 -97.3300 251.000 122.0 95.482 2.170 -999.990 -999.990 0.955 ..P WKT 2010 07 09 19 34 55 31.3200 -97.3300 251.000 457.0 90.380 3.090 -999.990 -999.990 0.904 ..P WKT 2010 07 09 19 39 55 31.3200 -97.3300 251.000 30.0 92.559 3.420 -999.990 -999.990 0.926 ..P WKT 2010 07 09 19 44 55 31.3200 -97.3300 251.000 122.0 97.818 2.590 -999.990 -999.990 0.978 ..P WKT 2010 07 09 19 49 55 31.3200 -97.3300 251.000 457.0 94.397 3.000 -999.990 -999.990 0.944 ..P WKT 2010 07 09 19 59 55 31.3200 -97.3300 251.000 30.0 89.356 3.170 -999.990 -999.990 0.894 ..P WKT 2010 07 09 20 04 55 31.3200 -97.3300 251.000 122.0 92.494 2.960 -999.990 -999.990 0.925 ..P WKT 2010 07 09 20 09 55 31.3200 -97.3300 251.000 457.0 97.870 3.840 -999.990 -999.990 0.979 ..P WKT 2010 07 09 20 14 55 31.3200 -97.3300 251.000 30.0 93.451 4.800 -999.990 -999.990 0.935 ..P WKT 2010 07 09 20 19 55 31.3200 -97.3300 251.000 122.0 94.629 2.700 -999.990 -999.990 0.946 ..P WKT 2010 07 09 20 24 55 31.3200 -97.3300 251.000 457.0 98.325 2.750 -999.990 -999.990 0.983 ..P WKT 2010 07 09 20 34 55 31.3200 -97.3300 251.000 30.0 98.921 2.850 -999.990 -999.990 0.989 ..P WKT 2010 07 09 20 39 55 31.3200 -97.3300 251.000 122.0 98.899 3.670 -999.990 -999.990 0.989 ..P WKT 2010 07 09 20 44 55 31.3200 -97.3300 251.000 457.0 109.226 3.140 -999.990 -999.990 1.092 ..P WKT 2010 07 09 20 49 55 31.3200 -97.3300 251.000 30.0 101.652 4.220 -999.990 -999.990 1.017 ..P WKT 2010 07 09 20 54 55 31.3200 -97.3300 251.000 122.0 101.071 5.010 -999.990 -999.990 1.011 ..P WKT 2010 07 09 20 59 55 31.3200 -97.3300 251.000 457.0 104.684 3.670 -999.990 -999.990 1.047 ..P WKT 2010 07 09 21 09 55 31.3200 -97.3300 251.000 30.0 101.484 4.640 -999.990 -999.990 1.015 ..P WKT 2010 07 09 21 14 55 31.3200 -97.3300 251.000 122.0 106.973 3.390 -999.990 -999.990 1.070 ..P WKT 2010 07 09 21 19 55 31.3200 -97.3300 251.000 457.0 100.582 4.930 -999.990 -999.990 1.006 ..P WKT 2010 07 09 21 24 55 31.3200 -97.3300 251.000 30.0 111.381 3.870 -999.990 -999.990 1.114 ..P WKT 2010 07 09 21 29 55 31.3200 -97.3300 251.000 122.0 105.270 5.110 -999.990 -999.990 1.053 ..P WKT 2010 07 09 21 34 55 31.3200 -97.3300 251.000 457.0 83.931 3.290 -999.990 -999.990 0.839 ..P WKT 2010 07 09 21 44 55 31.3200 -97.3300 251.000 30.0 77.385 3.210 -999.990 -999.990 0.774 ..P WKT 2010 07 09 21 49 55 31.3200 -97.3300 251.000 122.0 85.047 3.530 -999.990 -999.990 0.850 ..P WKT 2010 07 09 21 54 55 31.3200 -97.3300 251.000 457.0 76.229 3.560 -999.990 -999.990 0.762 ..P WKT 2010 07 09 21 59 55 31.3200 -97.3300 251.000 30.0 81.934 3.160 -999.990 -999.990 0.819 ..P WKT 2010 07 09 22 04 55 31.3200 -97.3300 251.000 122.0 84.847 3.000 -999.990 -999.990 0.848 ..P WKT 2010 07 09 22 09 55 31.3200 -97.3300 251.000 457.0 83.989 4.080 -999.990 -999.990 0.840 ..P WKT 2010 07 09 22 19 55 31.3200 -97.3300 251.000 30.0 82.413 3.560 -999.990 -999.990 0.824 ..P WKT 2010 07 09 22 24 55 31.3200 -97.3300 251.000 122.0 86.022 3.480 -999.990 -999.990 0.860 ..P WKT 2010 07 09 22 29 55 31.3200 -97.3300 251.000 457.0 82.791 3.670 -999.990 -999.990 0.828 ..P WKT 2010 07 09 22 34 55 31.3200 -97.3300 251.000 30.0 80.538 3.940 -999.990 -999.990 0.805 ..P WKT 2010 07 09 22 39 55 31.3200 -97.3300 251.000 122.0 83.310 4.010 -999.990 -999.990 0.833 ..P WKT 2010 07 09 22 44 55 31.3200 -97.3300 251.000 457.0 84.127 2.670 -999.990 -999.990 0.841 ..P WKT 2010 07 09 22 54 55 31.3200 -97.3300 251.000 30.0 81.654 3.080 -999.990 -999.990 0.817 ..P WKT 2010 07 09 22 59 55 31.3200 -97.3300 251.000 122.0 88.270 4.260 -999.990 -999.990 0.883 ..P WKT 2010 07 09 23 04 55 31.3200 -97.3300 251.000 457.0 93.072 3.780 -999.990 -999.990 0.931 ..P WKT 2010 07 09 23 09 55 31.3200 -97.3300 251.000 30.0 86.436 3.510 -999.990 -999.990 0.864 ..P WKT 2010 07 09 23 14 55 31.3200 -97.3300 251.000 122.0 86.217 4.310 -999.990 -999.990 0.862 ..P WKT 2010 07 09 23 19 55 31.3200 -97.3300 251.000 457.0 84.463 3.240 -999.990 -999.990 0.845 ..P WKT 2010 07 09 23 29 55 31.3200 -97.3300 251.000 30.0 90.323 2.740 -999.990 -999.990 0.903 ..P WKT 2010 07 09 23 34 55 31.3200 -97.3300 251.000 122.0 84.412 3.460 -999.990 -999.990 0.844 ..P WKT 2010 07 09 23 39 55 31.3200 -97.3300 251.000 457.0 84.915 3.290 -999.990 -999.990 0.849 ..P WKT 2010 07 09 23 44 55 31.3200 -97.3300 251.000 30.0 97.124 3.470 -999.990 -999.990 0.971 ..P WKT 2010 07 09 23 49 55 31.3200 -97.3300 251.000 122.0 91.772 3.790 -999.990 -999.990 0.918 ..P WKT 2010 07 10 00 09 55 31.3200 -97.3300 251.000 457.0 80.905 4.160 -999.990 -999.990 0.809 ..P WKT 2010 07 10 00 10 25 31.3200 -97.3300 251.000 457.0 81.196 3.750 -999.990 -999.990 0.812 ..P WKT 2010 07 10 00 10 55 31.3200 -97.3300 251.000 457.0 83.996 3.480 -999.990 -999.990 0.840 ..P WKT 2010 07 10 00 11 25 31.3200 -97.3300 251.000 457.0 84.844 3.720 -999.990 -999.990 0.848 ..P WKT 2010 07 10 00 11 55 31.3200 -97.3300 251.000 457.0 83.464 3.550 -999.990 -999.990 0.835 ..P WKT 2010 07 10 00 12 25 31.3200 -97.3300 251.000 457.0 84.870 3.420 -999.990 -999.990 0.849 ..P WKT 2010 07 10 00 12 55 31.3200 -97.3300 251.000 457.0 82.653 3.700 -999.990 -999.990 0.827 ..P WKT 2010 07 10 00 13 25 31.3200 -97.3300 251.000 457.0 77.093 3.210 -999.990 -999.990 0.771 ..P WKT 2010 07 10 00 13 55 31.3200 -97.3300 251.000 457.0 83.236 3.870 -999.990 -999.990 0.832 ..P WKT 2010 07 10 00 14 25 31.3200 -97.3300 251.000 457.0 81.855 3.370 -999.990 -999.990 0.819 ..P WKT 2010 07 10 00 14 55 31.3200 -97.3300 251.000 457.0 81.310 3.300 -999.990 -999.990 0.813 ..P WKT 2010 07 10 00 19 55 31.3200 -97.3300 251.000 30.0 93.974 3.280 -999.990 -999.990 0.940 ..P WKT 2010 07 10 00 24 55 31.3200 -97.3300 251.000 122.0 85.463 4.330 -999.990 -999.990 0.855 ..P WKT 2010 07 10 00 29 55 31.3200 -97.3300 251.000 457.0 80.575 3.920 -999.990 -999.990 0.806 ..P WKT 2010 07 10 00 34 55 31.3200 -97.3300 251.000 30.0 119.704 3.840 -999.990 -999.990 1.197 ..P WKT 2010 07 10 00 39 55 31.3200 -97.3300 251.000 122.0 90.299 3.070 -999.990 -999.990 0.903 ..P WKT 2010 07 10 00 44 55 31.3200 -97.3300 251.000 457.0 90.982 2.870 -999.990 -999.990 0.910 ..P WKT 2010 07 10 00 54 55 31.3200 -97.3300 251.000 30.0 95.448 3.460 -999.990 -999.990 0.954 ..P WKT 2010 07 10 00 59 55 31.3200 -97.3300 251.000 122.0 87.253 3.270 -999.990 -999.990 0.873 ..P WKT 2010 07 10 01 04 55 31.3200 -97.3300 251.000 457.0 82.958 4.250 -999.990 -999.990 0.830 ..P WKT 2010 07 10 01 09 55 31.3200 -97.3300 251.000 30.0 92.311 5.540 -999.990 -999.990 0.923 ..P WKT 2010 07 10 01 14 55 31.3200 -97.3300 251.000 122.0 90.244 5.200 -999.990 -999.990 0.902 ..P WKT 2010 07 10 01 19 55 31.3200 -97.3300 251.000 457.0 77.036 4.450 -999.990 -999.990 0.770 ..P WKT 2010 07 10 01 29 55 31.3200 -97.3300 251.000 30.0 124.191 4.620 -999.990 -999.990 1.242 ..P WKT 2010 07 10 01 34 55 31.3200 -97.3300 251.000 122.0 90.969 4.800 -999.990 -999.990 0.910 ..P WKT 2010 07 10 01 39 55 31.3200 -97.3300 251.000 457.0 80.030 5.440 -999.990 -999.990 0.800 ..P WKT 2010 07 10 01 44 55 31.3200 -97.3300 251.000 30.0 132.452 4.910 -999.990 -999.990 1.325 ..P WKT 2010 07 10 01 49 55 31.3200 -97.3300 251.000 122.0 87.674 3.500 -999.990 -999.990 0.877 ..P WKT 2010 07 10 01 54 55 31.3200 -97.3300 251.000 457.0 78.824 3.170 -999.990 -999.990 0.788 ..P WKT 2010 07 10 02 04 55 31.3200 -97.3300 251.000 30.0 91.998 2.550 -999.990 -999.990 0.920 ..P WKT 2010 07 10 02 09 55 31.3200 -97.3300 251.000 122.0 90.210 3.090 -999.990 -999.990 0.902 ..P WKT 2010 07 10 02 14 55 31.3200 -97.3300 251.000 457.0 80.207 3.760 -999.990 -999.990 0.802 ..P WKT 2010 07 10 02 19 55 31.3200 -97.3300 251.000 30.0 96.102 3.530 -999.990 -999.990 0.961 ..P WKT 2010 07 10 02 24 55 31.3200 -97.3300 251.000 122.0 91.390 2.750 -999.990 -999.990 0.914 ..P WKT 2010 07 10 02 29 55 31.3200 -97.3300 251.000 457.0 82.223 3.270 -999.990 -999.990 0.822 ..P WKT 2010 07 10 02 39 55 31.3200 -97.3300 251.000 30.0 104.085 3.110 -999.990 -999.990 1.041 ..P WKT 2010 07 10 02 44 55 31.3200 -97.3300 251.000 122.0 89.172 3.500 -999.990 -999.990 0.892 ..P WKT 2010 07 10 02 49 55 31.3200 -97.3300 251.000 457.0 88.597 2.310 -999.990 -999.990 0.886 ..P WKT 2010 07 10 02 54 55 31.3200 -97.3300 251.000 30.0 108.208 2.900 -999.990 -999.990 1.082 ..P WKT 2010 07 10 02 59 55 31.3200 -97.3300 251.000 122.0 87.587 2.580 -999.990 -999.990 0.876 ..P WKT 2010 07 10 03 04 55 31.3200 -97.3300 251.000 457.0 82.140 2.590 -999.990 -999.990 0.821 ..P WKT 2010 07 10 03 14 55 31.3200 -97.3300 251.000 30.0 94.395 2.090 -999.990 -999.990 0.944 ..P WKT 2010 07 10 03 19 55 31.3200 -97.3300 251.000 122.0 94.835 3.180 -999.990 -999.990 0.948 ..P WKT 2010 07 10 03 24 55 31.3200 -97.3300 251.000 457.0 86.366 2.410 -999.990 -999.990 0.864 ..P WKT 2010 07 10 03 29 55 31.3200 -97.3300 251.000 30.0 92.373 2.580 -999.990 -999.990 0.924 ..P WKT 2010 07 10 03 34 55 31.3200 -97.3300 251.000 122.0 101.164 2.710 -999.990 -999.990 1.012 ..P WKT 2010 07 10 03 39 55 31.3200 -97.3300 251.000 457.0 80.170 2.120 -999.990 -999.990 0.802 ..P WKT 2010 07 10 03 49 55 31.3200 -97.3300 251.000 30.0 87.253 2.350 -999.990 -999.990 0.873 ..P WKT 2010 07 10 03 54 55 31.3200 -97.3300 251.000 122.0 89.999 2.900 -999.990 -999.990 0.900 ..P WKT 2010 07 10 03 59 55 31.3200 -97.3300 251.000 457.0 77.158 3.220 -999.990 -999.990 0.772 ..P WKT 2010 07 10 04 04 55 31.3200 -97.3300 251.000 30.0 106.624 4.180 -999.990 -999.990 1.066 ..P WKT 2010 07 10 04 09 55 31.3200 -97.3300 251.000 122.0 87.103 3.380 -999.990 -999.990 0.871 ..P WKT 2010 07 10 04 14 55 31.3200 -97.3300 251.000 457.0 78.160 3.820 -999.990 -999.990 0.782 ..P WKT 2010 07 10 04 24 55 31.3200 -97.3300 251.000 30.0 112.634 3.160 -999.990 -999.990 1.126 ..P WKT 2010 07 10 04 29 55 31.3200 -97.3300 251.000 122.0 95.382 4.140 -999.990 -999.990 0.954 ..P WKT 2010 07 10 04 34 55 31.3200 -97.3300 251.000 457.0 87.314 5.290 -999.990 -999.990 0.873 ..P WKT 2010 07 10 04 39 55 31.3200 -97.3300 251.000 30.0 126.276 5.420 -999.990 -999.990 1.263 ..P WKT 2010 07 10 04 44 55 31.3200 -97.3300 251.000 122.0 100.119 5.930 -999.990 -999.990 1.001 ..P WKT 2010 07 10 04 49 55 31.3200 -97.3300 251.000 457.0 88.990 3.820 -999.990 -999.990 0.890 ..P WKT 2010 07 10 05 04 55 31.3200 -97.3300 251.000 30.0 130.353 4.690 -999.990 -999.990 1.304 ..P WKT 2010 07 10 05 09 55 31.3200 -97.3300 251.000 122.0 96.216 5.500 -999.990 -999.990 0.962 ..P WKT 2010 07 10 05 14 55 31.3200 -97.3300 251.000 457.0 86.566 5.690 -999.990 -999.990 0.866 ..P WKT 2010 07 10 05 19 55 31.3200 -97.3300 251.000 30.0 127.974 6.400 -999.990 -999.990 1.280 ..P WKT 2010 07 10 05 24 55 31.3200 -97.3300 251.000 122.0 97.596 4.620 -999.990 -999.990 0.976 ..P WKT 2010 07 10 05 29 55 31.3200 -97.3300 251.000 457.0 76.818 5.510 -999.990 -999.990 0.768 ..P WKT 2010 07 10 05 39 55 31.3200 -97.3300 251.000 30.0 117.688 3.390 -999.990 -999.990 1.177 ..P WKT 2010 07 10 05 44 55 31.3200 -97.3300 251.000 122.0 94.062 5.120 -999.990 -999.990 0.941 ..P WKT 2010 07 10 05 49 55 31.3200 -97.3300 251.000 457.0 80.731 5.960 -999.990 -999.990 0.807 ..P WKT 2010 07 10 05 54 55 31.3200 -97.3300 251.000 30.0 118.865 5.510 -999.990 -999.990 1.189 ..P WKT 2010 07 10 05 59 55 31.3200 -97.3300 251.000 122.0 97.884 4.640 -999.990 -999.990 0.979 ..P WKT 2010 07 10 06 04 55 31.3200 -97.3300 251.000 457.0 86.640 3.960 -999.990 -999.990 0.866 ..P WKT 2010 07 10 06 14 55 31.3200 -97.3300 251.000 30.0 115.832 3.370 -999.990 -999.990 1.158 ..P WKT 2010 07 10 06 19 55 31.3200 -97.3300 251.000 122.0 103.972 4.350 -999.990 -999.990 1.040 ..P WKT 2010 07 10 06 24 55 31.3200 -97.3300 251.000 457.0 84.742 5.620 -999.990 -999.990 0.847 ..P WKT 2010 07 10 06 29 55 31.3200 -97.3300 251.000 30.0 102.367 3.640 -999.990 -999.990 1.024 ..P WKT 2010 07 10 06 34 55 31.3200 -97.3300 251.000 122.0 106.085 3.570 -999.990 -999.990 1.061 ..P WKT 2010 07 10 06 39 55 31.3200 -97.3300 251.000 457.0 85.465 2.580 -999.990 -999.990 0.855 ..P WKT 2010 07 10 06 49 55 31.3200 -97.3300 251.000 30.0 93.992 4.070 -999.990 -999.990 0.940 ..P WKT 2010 07 10 06 54 55 31.3200 -97.3300 251.000 122.0 105.476 3.200 -999.990 -999.990 1.055 ..P WKT 2010 07 10 06 59 55 31.3200 -97.3300 251.000 457.0 80.527 4.800 -999.990 -999.990 0.805 ..P WKT 2010 07 10 07 04 55 31.3200 -97.3300 251.000 30.0 103.553 3.380 -999.990 -999.990 1.036 ..P WKT 2010 07 10 07 09 55 31.3200 -97.3300 251.000 122.0 101.132 4.970 -999.990 -999.990 1.011 ..P WKT 2010 07 10 07 14 55 31.3200 -97.3300 251.000 457.0 86.335 3.770 -999.990 -999.990 0.863 ..P WKT 2010 07 10 07 24 55 31.3200 -97.3300 251.000 30.0 112.817 4.590 -999.990 -999.990 1.128 ..P WKT 2010 07 10 07 29 55 31.3200 -97.3300 251.000 122.0 97.366 3.600 -999.990 -999.990 0.974 ..P WKT 2010 07 10 07 34 55 31.3200 -97.3300 251.000 457.0 90.814 3.550 -999.990 -999.990 0.908 ..P WKT 2010 07 10 07 39 55 31.3200 -97.3300 251.000 30.0 117.629 3.240 -999.990 -999.990 1.176 ..P WKT 2010 07 10 07 44 55 31.3200 -97.3300 251.000 122.0 94.671 3.580 -999.990 -999.990 0.947 ..P WKT 2010 07 10 07 49 55 31.3200 -97.3300 251.000 457.0 87.008 3.490 -999.990 -999.990 0.870 ..P WKT 2010 07 10 07 59 55 31.3200 -97.3300 251.000 30.0 111.598 2.730 -999.990 -999.990 1.116 ..P WKT 2010 07 10 08 04 55 31.3200 -97.3300 251.000 122.0 99.089 3.540 -999.990 -999.990 0.991 ..P WKT 2010 07 10 08 09 55 31.3200 -97.3300 251.000 457.0 89.638 2.440 -999.990 -999.990 0.896 ..P WKT 2010 07 10 08 14 55 31.3200 -97.3300 251.000 30.0 98.815 2.740 -999.990 -999.990 0.988 ..P WKT 2010 07 10 08 19 55 31.3200 -97.3300 251.000 122.0 90.755 1.910 -999.990 -999.990 0.908 ..P WKT 2010 07 10 08 24 55 31.3200 -97.3300 251.000 457.0 82.139 2.580 -999.990 -999.990 0.821 ..P WKT 2010 07 10 08 34 55 31.3200 -97.3300 251.000 30.0 102.854 2.180 -999.990 -999.990 1.029 ..P WKT 2010 07 10 08 39 55 31.3200 -97.3300 251.000 122.0 88.261 1.810 -999.990 -999.990 0.883 ..P WKT 2010 07 10 08 44 55 31.3200 -97.3300 251.000 457.0 81.732 2.180 -999.990 -999.990 0.817 ..P WKT 2010 07 10 08 49 55 31.3200 -97.3300 251.000 30.0 96.327 3.320 -999.990 -999.990 0.963 ..P WKT 2010 07 10 08 54 55 31.3200 -97.3300 251.000 122.0 87.574 2.290 -999.990 -999.990 0.876 ..P WKT 2010 07 10 08 59 55 31.3200 -97.3300 251.000 457.0 80.766 3.100 -999.990 -999.990 0.808 ..P WKT 2010 07 10 09 09 55 31.3200 -97.3300 251.000 30.0 99.056 2.820 -999.990 -999.990 0.991 ..P WKT 2010 07 10 09 14 55 31.3200 -97.3300 251.000 122.0 88.298 2.640 -999.990 -999.990 0.883 ..P WKT 2010 07 10 09 19 55 31.3200 -97.3300 251.000 457.0 78.235 2.490 -999.990 -999.990 0.782 ..P WKT 2010 07 10 09 24 55 31.3200 -97.3300 251.000 30.0 98.884 3.110 -999.990 -999.990 0.989 ..P WKT 2010 07 10 09 29 55 31.3200 -97.3300 251.000 122.0 88.265 3.220 -999.990 -999.990 0.883 ..P WKT 2010 07 10 09 34 55 31.3200 -97.3300 251.000 457.0 85.706 2.760 -999.990 -999.990 0.857 ..P WKT 2010 07 10 09 44 55 31.3200 -97.3300 251.000 30.0 103.100 3.260 -999.990 -999.990 1.031 ..P WKT 2010 07 10 09 49 55 31.3200 -97.3300 251.000 122.0 89.842 2.800 -999.990 -999.990 0.898 ..P WKT 2010 07 10 09 54 55 31.3200 -97.3300 251.000 457.0 80.337 2.540 -999.990 -999.990 0.803 ..P WKT 2010 07 10 09 59 55 31.3200 -97.3300 251.000 30.0 98.064 2.730 -999.990 -999.990 0.981 ..P WKT 2010 07 10 10 04 55 31.3200 -97.3300 251.000 122.0 92.171 3.010 -999.990 -999.990 0.922 ..P WKT 2010 07 10 10 09 55 31.3200 -97.3300 251.000 457.0 87.668 2.780 -999.990 -999.990 0.877 ..P WKT 2010 07 10 10 19 55 31.3200 -97.3300 251.000 30.0 112.064 3.500 -999.990 -999.990 1.121 ..P WKT 2010 07 10 10 24 55 31.3200 -97.3300 251.000 122.0 87.755 2.790 -999.990 -999.990 0.878 ..P WKT 2010 07 10 10 29 55 31.3200 -97.3300 251.000 457.0 85.118 3.450 -999.990 -999.990 0.851 ..P WKT 2010 07 10 10 34 55 31.3200 -97.3300 251.000 30.0 88.731 3.590 -999.990 -999.990 0.887 ..P WKT 2010 07 10 10 39 55 31.3200 -97.3300 251.000 122.0 97.486 3.830 -999.990 -999.990 0.975 ..P WKT 2010 07 10 10 44 55 31.3200 -97.3300 251.000 457.0 84.152 4.020 -999.990 -999.990 0.842 ..P WKT 2010 07 10 10 54 55 31.3200 -97.3300 251.000 30.0 87.809 4.010 -999.990 -999.990 0.878 ..P WKT 2010 07 10 10 59 55 31.3200 -97.3300 251.000 122.0 94.518 4.360 -999.990 -999.990 0.945 ..P WKT 2010 07 10 11 04 55 31.3200 -97.3300 251.000 457.0 81.780 3.170 -999.990 -999.990 0.818 ..P WKT 2010 07 10 11 09 55 31.3200 -97.3300 251.000 30.0 94.740 3.030 -999.990 -999.990 0.947 ..P WKT 2010 07 10 11 14 55 31.3200 -97.3300 251.000 122.0 101.032 3.080 -999.990 -999.990 1.010 ..P WKT 2010 07 10 11 19 55 31.3200 -97.3300 251.000 457.0 79.268 2.940 -999.990 -999.990 0.793 ..P WKT 2010 07 10 11 29 55 31.3200 -97.3300 251.000 30.0 99.451 2.210 -999.990 -999.990 0.995 ..P WKT 2010 07 10 11 34 55 31.3200 -97.3300 251.000 122.0 100.009 2.530 -999.990 -999.990 1.000 ..P WKT 2010 07 10 11 39 55 31.3200 -97.3300 251.000 457.0 88.622 5.190 -999.990 -999.990 0.886 ..P WKT 2010 07 10 11 44 55 31.3200 -97.3300 251.000 30.0 100.569 4.220 -999.990 -999.990 1.006 ..P WKT 2010 07 10 11 49 55 31.3200 -97.3300 251.000 122.0 110.569 5.310 -999.990 -999.990 1.106 ..P WKT 2010 07 10 12 09 55 31.3200 -97.3300 251.000 457.0 88.184 3.950 -999.990 -999.990 0.882 ..P WKT 2010 07 10 12 10 25 31.3200 -97.3300 251.000 457.0 86.194 4.410 -999.990 -999.990 0.862 ..P WKT 2010 07 10 12 10 55 31.3200 -97.3300 251.000 457.0 86.149 4.710 -999.990 -999.990 0.861 ..P WKT 2010 07 10 12 11 25 31.3200 -97.3300 251.000 457.0 82.770 4.230 -999.990 -999.990 0.828 ..P WKT 2010 07 10 12 11 55 31.3200 -97.3300 251.000 457.0 86.614 3.540 -999.990 -999.990 0.866 ..P WKT 2010 07 10 12 12 25 31.3200 -97.3300 251.000 457.0 85.179 3.300 -999.990 -999.990 0.852 ..P WKT 2010 07 10 12 12 55 31.3200 -97.3300 251.000 457.0 83.189 3.640 -999.990 -999.990 0.832 ..P WKT 2010 07 10 12 13 25 31.3200 -97.3300 251.000 457.0 81.198 4.100 -999.990 -999.990 0.812 ..P WKT 2010 07 10 12 13 55 31.3200 -97.3300 251.000 457.0 82.819 4.210 -999.990 -999.990 0.828 ..P WKT 2010 07 10 12 14 25 31.3200 -97.3300 251.000 457.0 84.163 3.660 -999.990 -999.990 0.842 ..P WKT 2010 07 10 12 14 55 31.3200 -97.3300 251.000 457.0 86.896 4.920 -999.990 -999.990 0.869 ..P WKT 2010 07 10 12 19 55 31.3200 -97.3300 251.000 30.0 111.447 3.840 -999.990 -999.990 1.114 ..P WKT 2010 07 10 12 24 55 31.3200 -97.3300 251.000 122.0 102.103 3.130 -999.990 -999.990 1.021 ..P WKT 2010 07 10 12 29 55 31.3200 -97.3300 251.000 457.0 81.639 3.540 -999.990 -999.990 0.816 ..P WKT 2010 07 10 12 34 55 31.3200 -97.3300 251.000 30.0 107.032 3.040 -999.990 -999.990 1.070 ..P WKT 2010 07 10 12 39 55 31.3200 -97.3300 251.000 122.0 108.247 3.250 -999.990 -999.990 1.082 ..P WKT 2010 07 10 12 44 55 31.3200 -97.3300 251.000 457.0 80.826 4.230 -999.990 -999.990 0.808 ..P WKT 2010 07 10 12 54 55 31.3200 -97.3300 251.000 30.0 111.263 2.910 -999.990 -999.990 1.113 ..P WKT 2010 07 10 12 59 55 31.3200 -97.3300 251.000 122.0 106.287 3.000 -999.990 -999.990 1.063 ..P WKT 2010 07 10 13 04 55 31.3200 -97.3300 251.000 457.0 81.147 3.020 -999.990 -999.990 0.811 ..P WKT 2010 07 10 13 09 55 31.3200 -97.3300 251.000 30.0 104.678 4.100 -999.990 -999.990 1.047 ..P WKT 2010 07 10 13 14 55 31.3200 -97.3300 251.000 122.0 111.246 2.570 -999.990 -999.990 1.112 ..P WKT 2010 07 10 13 19 55 31.3200 -97.3300 251.000 457.0 85.123 2.320 -999.990 -999.990 0.851 ..P WKT 2010 07 10 13 29 55 31.3200 -97.3300 251.000 30.0 108.494 2.980 -999.990 -999.990 1.085 ..P WKT 2010 07 10 13 34 55 31.3200 -97.3300 251.000 122.0 109.857 3.740 -999.990 -999.990 1.099 ..P WKT 2010 07 10 13 39 55 31.3200 -97.3300 251.000 457.0 85.054 4.500 -999.990 -999.990 0.851 ..P WKT 2010 07 10 13 44 55 31.3200 -97.3300 251.000 30.0 112.860 2.640 -999.990 -999.990 1.129 ..P WKT 2010 07 10 13 49 55 31.3200 -97.3300 251.000 122.0 108.098 3.160 -999.990 -999.990 1.081 ..P WKT 2010 07 10 13 54 55 31.3200 -97.3300 251.000 457.0 80.225 3.440 -999.990 -999.990 0.802 ..P WKT 2010 07 10 14 04 55 31.3200 -97.3300 251.000 30.0 107.830 2.910 -999.990 -999.990 1.078 ..P WKT 2010 07 10 14 09 55 31.3200 -97.3300 251.000 122.0 112.775 2.340 -999.990 -999.990 1.128 ..P WKT 2010 07 10 14 14 55 31.3200 -97.3300 251.000 457.0 85.824 2.680 -999.990 -999.990 0.858 ..P WKT 2010 07 10 14 19 55 31.3200 -97.3300 251.000 30.0 111.104 4.300 -999.990 -999.990 1.111 ..P WKT 2010 07 10 14 24 55 31.3200 -97.3300 251.000 122.0 106.437 3.220 -999.990 -999.990 1.064 ..P WKT 2010 07 10 14 29 55 31.3200 -97.3300 251.000 457.0 85.468 2.350 -999.990 -999.990 0.855 ..P WKT 2010 07 10 14 39 55 31.3200 -97.3300 251.000 30.0 112.858 2.360 -999.990 -999.990 1.129 ..P WKT 2010 07 10 14 44 55 31.3200 -97.3300 251.000 122.0 113.845 3.880 -999.990 -999.990 1.138 ..P WKT 2010 07 10 14 49 55 31.3200 -97.3300 251.000 457.0 85.698 3.840 -999.990 -999.990 0.857 ..P WKT 2010 07 10 14 54 55 31.3200 -97.3300 251.000 30.0 104.387 4.560 -999.990 -999.990 1.044 ..P WKT 2010 07 10 14 59 55 31.3200 -97.3300 251.000 122.0 114.156 3.810 -999.990 -999.990 1.142 ..P WKT 2010 07 10 15 04 55 31.3200 -97.3300 251.000 457.0 85.582 4.450 -999.990 -999.990 0.856 ..P WKT 2010 07 10 15 14 55 31.3200 -97.3300 251.000 30.0 104.844 3.430 -999.990 -999.990 1.048 ..P WKT 2010 07 10 15 19 55 31.3200 -97.3300 251.000 122.0 106.807 4.640 -999.990 -999.990 1.068 ..P WKT 2010 07 10 15 24 55 31.3200 -97.3300 251.000 457.0 91.472 4.280 -999.990 -999.990 0.915 ..P WKT 2010 07 10 15 29 55 31.3200 -97.3300 251.000 30.0 105.153 3.430 -999.990 -999.990 1.052 ..P WKT 2010 07 10 15 34 55 31.3200 -97.3300 251.000 122.0 108.232 3.070 -999.990 -999.990 1.082 ..P WKT 2010 07 10 15 39 55 31.3200 -97.3300 251.000 457.0 97.079 2.750 -999.990 -999.990 0.971 ..P WKT 2010 07 10 15 49 55 31.3200 -97.3300 251.000 30.0 95.581 2.670 -999.990 -999.990 0.956 ..P WKT 2010 07 10 15 54 55 31.3200 -97.3300 251.000 122.0 98.820 3.460 -999.990 -999.990 0.988 ..P WKT 2010 07 10 15 59 55 31.3200 -97.3300 251.000 457.0 98.990 3.150 -999.990 -999.990 0.990 ..P WKT 2010 07 10 16 04 55 31.3200 -97.3300 251.000 30.0 98.041 3.470 -999.990 -999.990 0.980 ..P WKT 2010 07 10 16 09 55 31.3200 -97.3300 251.000 122.0 105.471 4.530 -999.990 -999.990 1.055 ..P WKT 2010 07 10 16 14 55 31.3200 -97.3300 251.000 457.0 88.323 4.610 -999.990 -999.990 0.883 ..P WKT 2010 07 10 16 24 55 31.3200 -97.3300 251.000 30.0 100.632 4.280 -999.990 -999.990 1.006 ..P WKT 2010 07 10 16 29 55 31.3200 -97.3300 251.000 122.0 103.555 4.400 -999.990 -999.990 1.036 ..P WKT 2010 07 10 16 34 55 31.3200 -97.3300 251.000 457.0 96.140 3.700 -999.990 -999.990 0.961 ..P WKT 2010 07 10 16 39 55 31.3200 -97.3300 251.000 30.0 98.504 3.310 -999.990 -999.990 0.985 ..P WKT 2010 07 10 16 44 55 31.3200 -97.3300 251.000 122.0 110.372 3.290 -999.990 -999.990 1.104 ..P WKT 2010 07 10 16 49 55 31.3200 -97.3300 251.000 457.0 96.805 2.710 -999.990 -999.990 0.968 ..P WKT 2010 07 10 17 04 55 31.3200 -97.3300 251.000 30.0 98.315 2.290 -999.990 -999.990 0.983 ..P WKT 2010 07 10 17 09 55 31.3200 -97.3300 251.000 122.0 106.347 3.530 -999.990 -999.990 1.063 ..P WKT 2010 07 10 17 14 55 31.3200 -97.3300 251.000 457.0 90.188 2.870 -999.990 -999.990 0.902 ..P WKT 2010 07 10 17 19 55 31.3200 -97.3300 251.000 30.0 104.654 3.180 -999.990 -999.990 1.047 ..P WKT 2010 07 10 17 24 55 31.3200 -97.3300 251.000 122.0 114.927 2.650 -999.990 -999.990 1.149 ..P WKT 2010 07 10 17 29 55 31.3200 -97.3300 251.000 457.0 103.380 2.420 -999.990 -999.990 1.034 ..P WKT 2010 07 10 17 39 55 31.3200 -97.3300 251.000 30.0 105.110 2.200 -999.990 -999.990 1.051 ..P WKT 2010 07 10 17 44 55 31.3200 -97.3300 251.000 122.0 109.858 2.650 -999.990 -999.990 1.099 ..P WKT 2010 07 10 17 49 55 31.3200 -97.3300 251.000 457.0 93.614 2.930 -999.990 -999.990 0.936 ..P WKT 2010 07 10 17 54 55 31.3200 -97.3300 251.000 30.0 97.942 2.240 -999.990 -999.990 0.979 ..P WKT 2010 07 10 17 59 55 31.3200 -97.3300 251.000 122.0 111.649 2.860 -999.990 -999.990 1.116 ..P WKT 2010 07 10 18 04 55 31.3200 -97.3300 251.000 457.0 98.620 2.250 -999.990 -999.990 0.986 ..P WKT 2010 07 10 18 14 55 31.3200 -97.3300 251.000 30.0 97.838 2.430 -999.990 -999.990 0.978 ..P WKT 2010 07 10 18 19 55 31.3200 -97.3300 251.000 122.0 110.231 3.680 -999.990 -999.990 1.102 ..P WKT 2010 07 10 18 24 55 31.3200 -97.3300 251.000 457.0 100.637 3.300 -999.990 -999.990 1.006 ..P WKT 2010 07 10 18 29 55 31.3200 -97.3300 251.000 30.0 98.886 3.300 -999.990 -999.990 0.989 ..P WKT 2010 07 10 18 34 55 31.3200 -97.3300 251.000 122.0 99.936 4.310 -999.990 -999.990 0.999 ..P WKT 2010 07 10 18 39 55 31.3200 -97.3300 251.000 457.0 98.043 3.960 -999.990 -999.990 0.980 ..P WKT 2010 07 10 18 49 55 31.3200 -97.3300 251.000 30.0 94.699 3.750 -999.990 -999.990 0.947 ..P WKT 2010 07 10 18 54 55 31.3200 -97.3300 251.000 122.0 96.188 3.590 -999.990 -999.990 0.962 ..P WKT 2010 07 10 18 59 55 31.3200 -97.3300 251.000 457.0 90.671 3.690 -999.990 -999.990 0.907 ..P WKT 2010 07 10 19 04 55 31.3200 -97.3300 251.000 30.0 93.563 4.230 -999.990 -999.990 0.936 ..P WKT 2010 07 10 19 09 55 31.3200 -97.3300 251.000 122.0 100.382 3.730 -999.990 -999.990 1.004 ..P WKT 2010 07 10 19 14 55 31.3200 -97.3300 251.000 457.0 90.937 3.810 -999.990 -999.990 0.909 ..P WKT 2010 07 10 19 24 55 31.3200 -97.3300 251.000 30.0 104.296 3.670 -999.990 -999.990 1.043 ..P WKT 2010 07 10 19 29 55 31.3200 -97.3300 251.000 122.0 106.070 3.920 -999.990 -999.990 1.061 ..P WKT 2010 07 10 19 34 55 31.3200 -97.3300 251.000 457.0 99.988 3.940 -999.990 -999.990 1.000 ..P WKT 2010 07 10 19 39 55 31.3200 -97.3300 251.000 30.0 100.919 3.750 -999.990 -999.990 1.009 ..P WKT 2010 07 10 19 44 55 31.3200 -97.3300 251.000 122.0 105.218 3.570 -999.990 -999.990 1.052 ..P WKT 2010 07 10 19 49 55 31.3200 -97.3300 251.000 457.0 97.450 3.560 -999.990 -999.990 0.975 ..P WKT 2010 07 10 19 59 55 31.3200 -97.3300 251.000 30.0 102.320 3.380 -999.990 -999.990 1.023 ..P WKT 2010 07 10 20 04 55 31.3200 -97.3300 251.000 122.0 116.087 3.890 -999.990 -999.990 1.161 ..P WKT 2010 07 10 20 09 55 31.3200 -97.3300 251.000 457.0 107.675 3.700 -999.990 -999.990 1.077 ..P WKT 2010 07 10 20 14 55 31.3200 -97.3300 251.000 30.0 103.753 3.290 -999.990 -999.990 1.038 ..P WKT 2010 07 10 20 19 55 31.3200 -97.3300 251.000 122.0 114.997 3.780 -999.990 -999.990 1.150 ..P WKT 2010 07 10 20 24 55 31.3200 -97.3300 251.000 457.0 108.829 4.080 -999.990 -999.990 1.088 ..P WKT 2010 07 10 20 34 55 31.3200 -97.3300 251.000 30.0 105.919 2.670 -999.990 -999.990 1.059 ..P WKT 2010 07 10 20 39 55 31.3200 -97.3300 251.000 122.0 108.338 3.220 -999.990 -999.990 1.083 ..P WKT 2010 07 10 20 44 55 31.3200 -97.3300 251.000 457.0 102.045 2.650 -999.990 -999.990 1.020 ..P WKT 2010 07 10 20 49 55 31.3200 -97.3300 251.000 30.0 106.431 2.660 -999.990 -999.990 1.064 ..P WKT 2010 07 10 20 54 55 31.3200 -97.3300 251.000 122.0 114.190 3.180 -999.990 -999.990 1.142 ..P WKT 2010 07 10 20 59 55 31.3200 -97.3300 251.000 457.0 108.741 3.000 -999.990 -999.990 1.087 ..P WKT 2010 07 10 21 09 55 31.3200 -97.3300 251.000 30.0 106.432 2.900 -999.990 -999.990 1.064 ..P WKT 2010 07 10 21 14 55 31.3200 -97.3300 251.000 122.0 113.511 3.980 -999.990 -999.990 1.135 ..P WKT 2010 07 10 21 19 55 31.3200 -97.3300 251.000 457.0 108.219 3.370 -999.990 -999.990 1.082 ..P WKT 2010 07 10 21 24 55 31.3200 -97.3300 251.000 30.0 105.317 4.390 -999.990 -999.990 1.053 ..P WKT 2010 07 10 21 29 55 31.3200 -97.3300 251.000 122.0 121.962 4.640 -999.990 -999.990 1.220 ..P WKT 2010 07 10 21 34 55 31.3200 -97.3300 251.000 457.0 108.511 4.490 -999.990 -999.990 1.085 ..P WKT 2010 07 10 21 44 55 31.3200 -97.3300 251.000 30.0 107.306 3.650 -999.990 -999.990 1.073 ..P WKT 2010 07 10 21 49 55 31.3200 -97.3300 251.000 122.0 117.728 4.910 -999.990 -999.990 1.177 ..P WKT 2010 07 10 21 54 55 31.3200 -97.3300 251.000 457.0 106.904 3.730 -999.990 -999.990 1.069 ..P WKT 2010 07 10 21 59 55 31.3200 -97.3300 251.000 30.0 110.715 3.300 -999.990 -999.990 1.107 ..P WKT 2010 07 10 22 04 55 31.3200 -97.3300 251.000 122.0 116.495 5.130 -999.990 -999.990 1.165 ..P WKT 2010 07 10 22 09 55 31.3200 -97.3300 251.000 457.0 107.075 3.200 -999.990 -999.990 1.071 ..P WKT 2010 07 10 22 19 55 31.3200 -97.3300 251.000 30.0 107.418 2.740 -999.990 -999.990 1.074 ..P WKT 2010 07 10 22 24 55 31.3200 -97.3300 251.000 122.0 110.989 3.030 -999.990 -999.990 1.110 ..P WKT 2010 07 10 22 29 55 31.3200 -97.3300 251.000 457.0 105.688 4.070 -999.990 -999.990 1.057 ..P WKT 2010 07 10 22 34 55 31.3200 -97.3300 251.000 30.0 102.921 3.450 -999.990 -999.990 1.029 ..P WKT 2010 07 10 22 39 55 31.3200 -97.3300 251.000 122.0 109.169 4.410 -999.990 -999.990 1.092 ..P WKT 2010 07 10 22 44 55 31.3200 -97.3300 251.000 457.0 100.626 2.020 -999.990 -999.990 1.006 ..P WKT 2010 07 10 22 54 55 31.3200 -97.3300 251.000 30.0 103.504 2.350 -999.990 -999.990 1.035 ..P WKT 2010 07 10 22 59 55 31.3200 -97.3300 251.000 122.0 102.667 2.560 -999.990 -999.990 1.027 ..P WKT 2010 07 10 23 04 55 31.3200 -97.3300 251.000 457.0 99.576 2.510 -999.990 -999.990 0.996 ..P WKT 2010 07 10 23 09 55 31.3200 -97.3300 251.000 30.0 99.868 3.280 -999.990 -999.990 0.999 ..P WKT 2010 07 10 23 14 55 31.3200 -97.3300 251.000 122.0 101.850 2.930 -999.990 -999.990 1.018 ..P WKT 2010 07 10 23 19 55 31.3200 -97.3300 251.000 457.0 101.579 3.050 -999.990 -999.990 1.016 ..P WKT 2010 07 10 23 29 55 31.3200 -97.3300 251.000 30.0 100.399 2.730 -999.990 -999.990 1.004 ..P WKT 2010 07 10 23 34 55 31.3200 -97.3300 251.000 122.0 107.954 3.210 -999.990 -999.990 1.080 ..P WKT 2010 07 10 23 39 55 31.3200 -97.3300 251.000 457.0 102.251 2.780 -999.990 -999.990 1.023 ..P WKT 2010 07 10 23 44 55 31.3200 -97.3300 251.000 30.0 105.012 3.230 -999.990 -999.990 1.050 ..P WKT 2010 07 10 23 49 55 31.3200 -97.3300 251.000 122.0 112.853 2.850 -999.990 -999.990 1.129 ..P WKT 2010 07 11 00 09 55 31.3200 -97.3300 251.000 457.0 97.592 2.630 -999.990 -999.990 0.976 ..P WKT 2010 07 11 00 10 25 31.3200 -97.3300 251.000 457.0 97.669 2.660 -999.990 -999.990 0.977 ..P WKT 2010 07 11 00 10 55 31.3200 -97.3300 251.000 457.0 95.206 2.400 -999.990 -999.990 0.952 ..P WKT 2010 07 11 00 11 25 31.3200 -97.3300 251.000 457.0 100.643 2.180 -999.990 -999.990 1.006 ..P WKT 2010 07 11 00 11 55 31.3200 -97.3300 251.000 457.0 101.566 2.710 -999.990 -999.990 1.016 ..P WKT 2010 07 11 00 12 25 31.3200 -97.3300 251.000 457.0 96.000 2.730 -999.990 -999.990 0.960 ..P WKT 2010 07 11 00 12 55 31.3200 -97.3300 251.000 457.0 102.283 2.480 -999.990 -999.990 1.023 ..P WKT 2010 07 11 00 13 25 31.3200 -97.3300 251.000 457.0 100.667 2.510 -999.990 -999.990 1.007 ..P WKT 2010 07 11 00 13 55 31.3200 -97.3300 251.000 457.0 102.436 2.650 -999.990 -999.990 1.024 ..P WKT 2010 07 11 00 14 25 31.3200 -97.3300 251.000 457.0 100.255 2.430 -999.990 -999.990 1.003 ..P WKT 2010 07 11 00 14 55 31.3200 -97.3300 251.000 457.0 100.331 4.780 -999.990 -999.990 1.003 ..P WKT 2010 07 11 00 19 55 31.3200 -97.3300 251.000 30.0 95.737 3.010 -999.990 -999.990 0.957 ..P WKT 2010 07 11 00 24 55 31.3200 -97.3300 251.000 122.0 110.320 3.130 -999.990 -999.990 1.103 ..P WKT 2010 07 11 00 29 55 31.3200 -97.3300 251.000 457.0 103.188 3.640 -999.990 -999.990 1.032 ..P WKT 2010 07 11 00 34 55 31.3200 -97.3300 251.000 30.0 101.414 3.430 -999.990 -999.990 1.014 ..P WKT 2010 07 11 00 39 55 31.3200 -97.3300 251.000 122.0 102.741 4.030 -999.990 -999.990 1.027 ..P WKT 2010 07 11 00 44 55 31.3200 -97.3300 251.000 457.0 104.068 2.600 -999.990 -999.990 1.041 ..P WKT 2010 07 11 00 54 55 31.3200 -97.3300 251.000 30.0 98.854 3.270 -999.990 -999.990 0.989 ..P WKT 2010 07 11 00 59 55 31.3200 -97.3300 251.000 122.0 106.119 3.790 -999.990 -999.990 1.061 ..P WKT 2010 07 11 01 04 55 31.3200 -97.3300 251.000 457.0 102.679 4.840 -999.990 -999.990 1.027 ..P WKT 2010 07 11 01 09 55 31.3200 -97.3300 251.000 30.0 93.045 3.420 -999.990 -999.990 0.930 ..P WKT 2010 07 11 01 14 55 31.3200 -97.3300 251.000 122.0 94.957 3.220 -999.990 -999.990 0.950 ..P WKT 2010 07 11 01 19 55 31.3200 -97.3300 251.000 457.0 96.025 2.250 -999.990 -999.990 0.960 ..P WKT 2010 07 11 01 29 55 31.3200 -97.3300 251.000 30.0 100.752 2.530 -999.990 -999.990 1.008 ..P WKT 2010 07 11 01 34 55 31.3200 -97.3300 251.000 122.0 96.251 3.030 -999.990 -999.990 0.963 ..P WKT 2010 07 11 01 39 55 31.3200 -97.3300 251.000 457.0 95.127 3.050 -999.990 -999.990 0.951 ..P WKT 2010 07 11 01 44 55 31.3200 -97.3300 251.000 30.0 104.834 3.330 -999.990 -999.990 1.048 ..P WKT 2010 07 11 01 49 55 31.3200 -97.3300 251.000 122.0 105.678 2.760 -999.990 -999.990 1.057 ..P WKT 2010 07 11 01 54 55 31.3200 -97.3300 251.000 457.0 93.023 2.380 -999.990 -999.990 0.930 ..P WKT 2010 07 11 02 04 55 31.3200 -97.3300 251.000 30.0 108.288 3.330 -999.990 -999.990 1.083 ..P WKT 2010 07 11 02 09 55 31.3200 -97.3300 251.000 122.0 101.060 2.700 -999.990 -999.990 1.011 ..P WKT 2010 07 11 02 14 55 31.3200 -97.3300 251.000 457.0 99.596 4.980 -999.990 -999.990 0.996 ..P WKT 2010 07 11 02 19 55 31.3200 -97.3300 251.000 30.0 104.875 2.610 -999.990 -999.990 1.049 ..P WKT 2010 07 11 02 24 55 31.3200 -97.3300 251.000 122.0 101.584 4.630 -999.990 -999.990 1.016 ..P WKT 2010 07 11 02 29 55 31.3200 -97.3300 251.000 457.0 103.070 2.740 -999.990 -999.990 1.031 ..P WKT 2010 07 11 02 39 55 31.3200 -97.3300 251.000 30.0 126.559 2.840 -999.990 -999.990 1.266 ..P WKT 2010 07 11 02 44 55 31.3200 -97.3300 251.000 122.0 110.793 2.980 -999.990 -999.990 1.108 ..P WKT 2010 07 11 02 49 55 31.3200 -97.3300 251.000 457.0 96.295 3.140 -999.990 -999.990 0.963 ..P WKT 2010 07 11 02 54 55 31.3200 -97.3300 251.000 30.0 108.044 3.170 -999.990 -999.990 1.080 ..P WKT 2010 07 11 02 59 55 31.3200 -97.3300 251.000 122.0 113.056 2.680 -999.990 -999.990 1.131 ..P WKT 2010 07 11 03 04 55 31.3200 -97.3300 251.000 457.0 92.531 2.810 -999.990 -999.990 0.925 ..P WKT 2010 07 11 03 14 55 31.3200 -97.3300 251.000 30.0 101.331 2.770 -999.990 -999.990 1.013 ..P WKT 2010 07 11 03 19 55 31.3200 -97.3300 251.000 122.0 107.081 2.870 -999.990 -999.990 1.071 ..P WKT 2010 07 11 03 24 55 31.3200 -97.3300 251.000 457.0 97.968 4.360 -999.990 -999.990 0.980 ..P WKT 2010 07 11 03 29 55 31.3200 -97.3300 251.000 30.0 105.959 3.330 -999.990 -999.990 1.060 ..P WKT 2010 07 11 03 34 55 31.3200 -97.3300 251.000 122.0 101.895 2.250 -999.990 -999.990 1.019 ..P WKT 2010 07 11 03 39 55 31.3200 -97.3300 251.000 457.0 100.915 2.650 -999.990 -999.990 1.009 ..P WKT 2010 07 11 03 49 55 31.3200 -97.3300 251.000 30.0 101.197 2.600 -999.990 -999.990 1.012 ..P WKT 2010 07 11 03 54 55 31.3200 -97.3300 251.000 122.0 100.217 2.330 -999.990 -999.990 1.002 ..P WKT 2010 07 11 03 59 55 31.3200 -97.3300 251.000 457.0 100.638 2.770 -999.990 -999.990 1.006 ..P WKT 2010 07 11 04 04 55 31.3200 -97.3300 251.000 30.0 109.740 2.810 -999.990 -999.990 1.097 ..P WKT 2010 07 11 04 09 55 31.3200 -97.3300 251.000 122.0 96.440 2.350 -999.990 -999.990 0.964 ..P WKT 2010 07 11 04 14 55 31.3200 -97.3300 251.000 457.0 96.301 3.370 -999.990 -999.990 0.963 ..P WKT 2010 07 11 04 24 55 31.3200 -97.3300 251.000 30.0 102.422 4.080 -999.990 -999.990 1.024 ..P WKT 2010 07 11 04 29 55 31.3200 -97.3300 251.000 122.0 96.086 2.740 -999.990 -999.990 0.961 ..P WKT 2010 07 11 04 34 55 31.3200 -97.3300 251.000 457.0 104.022 3.290 -999.990 -999.990 1.040 ..P WKT 2010 07 11 04 39 55 31.3200 -97.3300 251.000 30.0 105.520 3.200 -999.990 -999.990 1.055 ..P WKT 2010 07 11 04 44 55 31.3200 -97.3300 251.000 122.0 101.985 3.640 -999.990 -999.990 1.020 ..P WKT 2010 07 11 04 49 55 31.3200 -97.3300 251.000 457.0 97.750 3.640 -999.990 -999.990 0.978 ..P WKT 2010 07 11 05 04 55 31.3200 -97.3300 251.000 30.0 105.990 4.080 -999.990 -999.990 1.060 ..P WKT 2010 07 11 05 09 55 31.3200 -97.3300 251.000 122.0 106.145 3.080 -999.990 -999.990 1.061 ..P WKT 2010 07 11 05 14 55 31.3200 -97.3300 251.000 457.0 100.711 4.980 -999.990 -999.990 1.007 ..P WKT 2010 07 11 05 19 55 31.3200 -97.3300 251.000 30.0 108.410 4.350 -999.990 -999.990 1.084 ..P WKT 2010 07 11 05 24 55 31.3200 -97.3300 251.000 122.0 110.799 4.230 -999.990 -999.990 1.108 ..P WKT 2010 07 11 05 29 55 31.3200 -97.3300 251.000 457.0 97.965 3.000 -999.990 -999.990 0.980 ..P WKT 2010 07 11 05 39 55 31.3200 -97.3300 251.000 30.0 113.799 3.060 -999.990 -999.990 1.138 ..P WKT 2010 07 11 05 44 55 31.3200 -97.3300 251.000 122.0 118.863 3.850 -999.990 -999.990 1.189 ..P WKT 2010 07 11 05 49 55 31.3200 -97.3300 251.000 457.0 102.571 4.270 -999.990 -999.990 1.026 ..P WKT 2010 07 11 05 54 55 31.3200 -97.3300 251.000 30.0 104.705 4.160 -999.990 -999.990 1.047 ..P WKT 2010 07 11 05 59 55 31.3200 -97.3300 251.000 122.0 126.510 2.910 -999.990 -999.990 1.265 ..P WKT 2010 07 11 06 04 55 31.3200 -97.3300 251.000 457.0 87.905 4.330 -999.990 -999.990 0.879 ..P WKT 2010 07 11 06 14 55 31.3200 -97.3300 251.000 30.0 106.877 3.000 -999.990 -999.990 1.069 ..P WKT 2010 07 11 06 19 55 31.3200 -97.3300 251.000 122.0 126.079 3.510 -999.990 -999.990 1.261 ..P WKT 2010 07 11 06 24 55 31.3200 -97.3300 251.000 457.0 89.928 3.110 -999.990 -999.990 0.899 ..P WKT 2010 07 11 06 29 55 31.3200 -97.3300 251.000 30.0 125.853 2.760 -999.990 -999.990 1.259 ..P WKT 2010 07 11 06 34 55 31.3200 -97.3300 251.000 122.0 109.644 3.510 -999.990 -999.990 1.096 ..P WKT 2010 07 11 06 39 55 31.3200 -97.3300 251.000 457.0 94.694 2.710 -999.990 -999.990 0.947 ..P WKT 2010 07 11 06 49 55 31.3200 -97.3300 251.000 30.0 100.110 4.210 -999.990 -999.990 1.001 ..P WKT 2010 07 11 06 54 55 31.3200 -97.3300 251.000 122.0 101.524 3.350 -999.990 -999.990 1.015 ..P WKT 2010 07 11 06 59 55 31.3200 -97.3300 251.000 457.0 90.126 2.240 -999.990 -999.990 0.901 ..P WKT 2010 07 11 07 04 55 31.3200 -97.3300 251.000 30.0 97.667 2.510 -999.990 -999.990 0.977 ..P WKT 2010 07 11 07 09 55 31.3200 -97.3300 251.000 122.0 109.939 2.600 -999.990 -999.990 1.099 ..P WKT 2010 07 11 07 14 55 31.3200 -97.3300 251.000 457.0 90.749 3.570 -999.990 -999.990 0.907 ..P WKT 2010 07 11 07 24 55 31.3200 -97.3300 251.000 30.0 104.510 2.580 -999.990 -999.990 1.045 ..P WKT 2010 07 11 07 29 55 31.3200 -97.3300 251.000 122.0 103.219 3.440 -999.990 -999.990 1.032 ..P WKT 2010 07 11 07 34 55 31.3200 -97.3300 251.000 457.0 94.137 4.320 -999.990 -999.990 0.941 ..P WKT 2010 07 11 07 39 55 31.3200 -97.3300 251.000 30.0 103.418 4.000 -999.990 -999.990 1.034 ..P WKT 2010 07 11 07 44 55 31.3200 -97.3300 251.000 122.0 109.915 3.910 -999.990 -999.990 1.099 ..P WKT 2010 07 11 07 49 55 31.3200 -97.3300 251.000 457.0 92.495 3.480 -999.990 -999.990 0.925 ..P WKT 2010 07 11 07 59 55 31.3200 -97.3300 251.000 30.0 108.066 4.440 -999.990 -999.990 1.081 ..P WKT 2010 07 11 08 04 55 31.3200 -97.3300 251.000 122.0 104.353 4.130 -999.990 -999.990 1.044 ..P WKT 2010 07 11 08 09 55 31.3200 -97.3300 251.000 457.0 87.858 4.730 -999.990 -999.990 0.879 ..P WKT 2010 07 11 08 14 55 31.3200 -97.3300 251.000 30.0 98.321 5.720 -999.990 -999.990 0.983 ..P WKT 2010 07 11 08 19 55 31.3200 -97.3300 251.000 122.0 109.336 4.570 -999.990 -999.990 1.093 ..P WKT 2010 07 11 08 24 55 31.3200 -97.3300 251.000 457.0 83.125 3.220 -999.990 -999.990 0.831 ..P WKT 2010 07 11 08 34 55 31.3200 -97.3300 251.000 30.0 106.259 3.910 -999.990 -999.990 1.063 ..P WKT 2010 07 11 08 39 55 31.3200 -97.3300 251.000 122.0 107.826 5.090 -999.990 -999.990 1.078 ..P WKT 2010 07 11 08 44 55 31.3200 -97.3300 251.000 457.0 89.821 6.320 -999.990 -999.990 0.898 ..P WKT 2010 07 11 08 49 55 31.3200 -97.3300 251.000 30.0 105.407 4.810 -999.990 -999.990 1.054 ..P WKT 2010 07 11 08 54 55 31.3200 -97.3300 251.000 122.0 113.772 4.830 -999.990 -999.990 1.138 ..P WKT 2010 07 11 08 59 55 31.3200 -97.3300 251.000 457.0 88.977 4.540 -999.990 -999.990 0.890 ..P WKT 2010 07 11 09 09 55 31.3200 -97.3300 251.000 30.0 105.427 3.000 -999.990 -999.990 1.054 ..P WKT 2010 07 11 09 14 55 31.3200 -97.3300 251.000 122.0 113.509 4.110 -999.990 -999.990 1.135 ..P WKT 2010 07 11 09 19 55 31.3200 -97.3300 251.000 457.0 92.890 4.670 -999.990 -999.990 0.929 ..P WKT 2010 07 11 09 24 55 31.3200 -97.3300 251.000 30.0 112.062 3.740 -999.990 -999.990 1.121 ..P WKT 2010 07 11 09 29 55 31.3200 -97.3300 251.000 122.0 107.665 2.860 -999.990 -999.990 1.077 ..P WKT 2010 07 11 09 34 55 31.3200 -97.3300 251.000 457.0 88.441 3.620 -999.990 -999.990 0.884 ..P WKT 2010 07 11 09 44 55 31.3200 -97.3300 251.000 30.0 105.844 3.570 -999.990 -999.990 1.058 ..P WKT 2010 07 11 09 49 55 31.3200 -97.3300 251.000 122.0 108.238 2.960 -999.990 -999.990 1.082 ..P WKT 2010 07 11 09 54 55 31.3200 -97.3300 251.000 457.0 84.871 2.640 -999.990 -999.990 0.849 ..P WKT 2010 07 11 09 59 55 31.3200 -97.3300 251.000 30.0 105.824 4.250 -999.990 -999.990 1.058 ..P WKT 2010 07 11 10 04 55 31.3200 -97.3300 251.000 122.0 103.649 2.580 -999.990 -999.990 1.036 ..P WKT 2010 07 11 10 09 55 31.3200 -97.3300 251.000 457.0 83.200 2.680 -999.990 -999.990 0.832 ..P WKT 2010 07 11 10 19 55 31.3200 -97.3300 251.000 30.0 107.367 2.670 -999.990 -999.990 1.074 ..P WKT 2010 07 11 10 24 55 31.3200 -97.3300 251.000 122.0 114.739 2.660 -999.990 -999.990 1.147 ..P WKT 2010 07 11 10 29 55 31.3200 -97.3300 251.000 457.0 88.077 2.270 -999.990 -999.990 0.881 ..P WKT 2010 07 11 10 34 55 31.3200 -97.3300 251.000 30.0 106.101 2.490 -999.990 -999.990 1.061 ..P WKT 2010 07 11 10 39 55 31.3200 -97.3300 251.000 122.0 105.587 3.160 -999.990 -999.990 1.056 ..P WKT 2010 07 11 10 44 55 31.3200 -97.3300 251.000 457.0 91.385 2.230 -999.990 -999.990 0.914 ..P WKT 2010 07 11 10 54 55 31.3200 -97.3300 251.000 30.0 104.718 2.660 -999.990 -999.990 1.047 ..P WKT 2010 07 11 10 59 55 31.3200 -97.3300 251.000 122.0 98.380 2.640 -999.990 -999.990 0.984 ..P WKT 2010 07 11 11 04 55 31.3200 -97.3300 251.000 457.0 87.346 3.400 -999.990 -999.990 0.873 ..P WKT 2010 07 11 11 09 55 31.3200 -97.3300 251.000 30.0 100.357 3.500 -999.990 -999.990 1.004 ..P WKT 2010 07 11 11 14 55 31.3200 -97.3300 251.000 122.0 96.233 4.200 -999.990 -999.990 0.962 ..P WKT 2010 07 11 11 19 55 31.3200 -97.3300 251.000 457.0 82.165 3.070 -999.990 -999.990 0.822 ..P WKT 2010 07 11 11 29 55 31.3200 -97.3300 251.000 30.0 100.987 4.720 -999.990 -999.990 1.010 ..P WKT 2010 07 11 11 34 55 31.3200 -97.3300 251.000 122.0 98.241 4.340 -999.990 -999.990 0.982 ..P WKT 2010 07 11 11 39 55 31.3200 -97.3300 251.000 457.0 94.668 3.730 -999.990 -999.990 0.947 ..P WKT 2010 07 11 11 44 55 31.3200 -97.3300 251.000 30.0 99.929 4.550 -999.990 -999.990 0.999 ..P WKT 2010 07 11 11 49 55 31.3200 -97.3300 251.000 122.0 97.738 3.760 -999.990 -999.990 0.977 ..P WKT 2010 07 11 12 09 55 31.3200 -97.3300 251.000 457.0 83.275 2.610 -999.990 -999.990 0.833 ..P WKT 2010 07 11 12 10 25 31.3200 -97.3300 251.000 457.0 85.984 2.880 -999.990 -999.990 0.860 ..P WKT 2010 07 11 12 10 55 31.3200 -97.3300 251.000 457.0 90.348 3.190 -999.990 -999.990 0.903 ..P WKT 2010 07 11 12 11 25 31.3200 -97.3300 251.000 457.0 84.780 2.590 -999.990 -999.990 0.848 ..P WKT 2010 07 11 12 11 55 31.3200 -97.3300 251.000 457.0 88.869 2.650 -999.990 -999.990 0.889 ..P WKT 2010 07 11 12 12 25 31.3200 -97.3300 251.000 457.0 88.266 2.590 -999.990 -999.990 0.883 ..P WKT 2010 07 11 12 12 55 31.3200 -97.3300 251.000 457.0 91.528 3.130 -999.990 -999.990 0.915 ..P WKT 2010 07 11 12 13 25 31.3200 -97.3300 251.000 457.0 93.133 2.880 -999.990 -999.990 0.931 ..P WKT 2010 07 11 12 13 55 31.3200 -97.3300 251.000 457.0 92.255 3.010 -999.990 -999.990 0.923 ..P WKT 2010 07 11 12 14 25 31.3200 -97.3300 251.000 457.0 88.894 2.810 -999.990 -999.990 0.889 ..P WKT 2010 07 11 12 14 55 31.3200 -97.3300 251.000 457.0 87.188 3.090 -999.990 -999.990 0.872 ..P WKT 2010 07 11 12 19 55 31.3200 -97.3300 251.000 30.0 102.692 3.880 -999.990 -999.990 1.027 ..P WKT 2010 07 11 12 24 55 31.3200 -97.3300 251.000 122.0 103.572 5.370 -999.990 -999.990 1.036 ..P WKT 2010 07 11 12 29 55 31.3200 -97.3300 251.000 457.0 88.166 4.660 -999.990 -999.990 0.882 ..P WKT 2010 07 11 12 34 55 31.3200 -97.3300 251.000 30.0 97.878 4.960 -999.990 -999.990 0.979 ..P WKT 2010 07 11 12 39 55 31.3200 -97.3300 251.000 122.0 100.413 2.380 -999.990 -999.990 1.004 ..P WKT 2010 07 11 12 44 55 31.3200 -97.3300 251.000 457.0 86.385 3.600 -999.990 -999.990 0.864 ..P WKT 2010 07 11 12 54 55 31.3200 -97.3300 251.000 30.0 97.203 4.950 -999.990 -999.990 0.972 ..P WKT 2010 07 11 12 59 55 31.3200 -97.3300 251.000 122.0 93.200 3.980 -999.990 -999.990 0.932 ..P WKT 2010 07 11 13 04 55 31.3200 -97.3300 251.000 457.0 85.606 3.300 -999.990 -999.990 0.856 ..P WKT 2010 07 11 13 09 55 31.3200 -97.3300 251.000 30.0 99.691 4.160 -999.990 -999.990 0.997 ..P WKT 2010 07 11 13 14 55 31.3200 -97.3300 251.000 122.0 97.758 2.990 -999.990 -999.990 0.978 ..P WKT 2010 07 11 13 19 55 31.3200 -97.3300 251.000 457.0 92.648 2.370 -999.990 -999.990 0.926 ..P WKT 2010 07 11 13 29 55 31.3200 -97.3300 251.000 30.0 108.770 3.300 -999.990 -999.990 1.088 ..P WKT 2010 07 11 13 34 55 31.3200 -97.3300 251.000 122.0 99.338 3.850 -999.990 -999.990 0.993 ..P WKT 2010 07 11 13 39 55 31.3200 -97.3300 251.000 457.0 82.723 4.460 -999.990 -999.990 0.827 ..P WKT 2010 07 11 13 44 55 31.3200 -97.3300 251.000 30.0 109.208 3.760 -999.990 -999.990 1.092 ..P WKT 2010 07 11 13 49 55 31.3200 -97.3300 251.000 122.0 110.137 5.630 -999.990 -999.990 1.101 ..P WKT 2010 07 11 13 54 55 31.3200 -97.3300 251.000 457.0 84.400 2.880 -999.990 -999.990 0.844 ..P WKT 2010 07 11 14 04 55 31.3200 -97.3300 251.000 30.0 101.040 3.420 -999.990 -999.990 1.010 ..P WKT 2010 07 11 14 09 55 31.3200 -97.3300 251.000 122.0 104.043 3.170 -999.990 -999.990 1.040 ..P WKT 2010 07 11 14 14 55 31.3200 -97.3300 251.000 457.0 87.696 3.580 -999.990 -999.990 0.877 ..P WKT 2010 07 11 14 19 55 31.3200 -97.3300 251.000 30.0 94.705 5.250 -999.990 -999.990 0.947 ..P WKT 2010 07 11 14 24 55 31.3200 -97.3300 251.000 122.0 103.235 3.400 -999.990 -999.990 1.032 ..P WKT 2010 07 11 14 29 55 31.3200 -97.3300 251.000 457.0 84.536 2.270 -999.990 -999.990 0.845 ..P WKT 2010 07 11 14 39 55 31.3200 -97.3300 251.000 30.0 90.539 2.610 -999.990 -999.990 0.905 ..P WKT 2010 07 11 14 44 55 31.3200 -97.3300 251.000 122.0 98.934 3.990 -999.990 -999.990 0.989 ..P WKT 2010 07 11 14 49 55 31.3200 -97.3300 251.000 457.0 82.164 3.140 -999.990 -999.990 0.822 ..P WKT 2010 07 11 14 54 55 31.3200 -97.3300 251.000 30.0 99.686 3.160 -999.990 -999.990 0.997 ..P WKT 2010 07 11 14 59 55 31.3200 -97.3300 251.000 122.0 99.785 2.870 -999.990 -999.990 0.998 ..P WKT 2010 07 11 15 04 55 31.3200 -97.3300 251.000 457.0 91.034 4.990 -999.990 -999.990 0.910 ..P WKT 2010 07 11 15 14 55 31.3200 -97.3300 251.000 30.0 95.816 3.860 -999.990 -999.990 0.958 ..P WKT 2010 07 11 15 19 55 31.3200 -97.3300 251.000 122.0 95.520 3.150 -999.990 -999.990 0.955 ..P WKT 2010 07 11 15 24 55 31.3200 -97.3300 251.000 457.0 95.224 3.280 -999.990 -999.990 0.952 ..P WKT 2010 07 11 15 29 55 31.3200 -97.3300 251.000 30.0 94.099 3.450 -999.990 -999.990 0.941 ..P WKT 2010 07 11 15 34 55 31.3200 -97.3300 251.000 122.0 101.550 4.200 -999.990 -999.990 1.016 ..P WKT 2010 07 11 15 39 55 31.3200 -97.3300 251.000 457.0 84.651 3.170 -999.990 -999.990 0.847 ..P WKT 2010 07 11 15 49 55 31.3200 -97.3300 251.000 30.0 91.886 5.200 -999.990 -999.990 0.919 ..P WKT 2010 07 11 15 54 55 31.3200 -97.3300 251.000 122.0 94.437 3.370 -999.990 -999.990 0.944 ..P WKT 2010 07 11 15 59 55 31.3200 -97.3300 251.000 457.0 92.281 3.910 -999.990 -999.990 0.923 ..P WKT 2010 07 11 16 04 55 31.3200 -97.3300 251.000 30.0 95.663 3.720 -999.990 -999.990 0.957 ..P WKT 2010 07 11 16 09 55 31.3200 -97.3300 251.000 122.0 97.384 5.050 -999.990 -999.990 0.974 ..P WKT 2010 07 11 16 14 55 31.3200 -97.3300 251.000 457.0 94.675 4.350 -999.990 -999.990 0.947 ..P WKT 2010 07 11 16 24 55 31.3200 -97.3300 251.000 30.0 98.493 3.690 -999.990 -999.990 0.985 ..P WKT 2010 07 11 16 29 55 31.3200 -97.3300 251.000 122.0 109.729 4.370 -999.990 -999.990 1.097 ..P WKT 2010 07 11 16 34 55 31.3200 -97.3300 251.000 457.0 94.934 3.040 -999.990 -999.990 0.949 ..P WKT 2010 07 11 16 39 55 31.3200 -97.3300 251.000 30.0 104.925 3.510 -999.990 -999.990 1.049 ..P WKT 2010 07 11 16 44 55 31.3200 -97.3300 251.000 122.0 117.133 3.270 -999.990 -999.990 1.171 ..P WKT 2010 07 11 16 49 55 31.3200 -97.3300 251.000 457.0 100.673 4.450 -999.990 -999.990 1.007 ..P WKT 2010 07 11 17 04 55 31.3200 -97.3300 251.000 30.0 96.130 3.720 -999.990 -999.990 0.961 ..P WKT 2010 07 11 17 09 55 31.3200 -97.3300 251.000 122.0 109.362 2.410 -999.990 -999.990 1.094 ..P WKT 2010 07 11 17 14 55 31.3200 -97.3300 251.000 457.0 98.768 2.470 -999.990 -999.990 0.988 ..P WKT 2010 07 11 17 19 55 31.3200 -97.3300 251.000 30.0 98.009 2.560 -999.990 -999.990 0.980 ..P WKT 2010 07 11 17 24 55 31.3200 -97.3300 251.000 122.0 110.967 2.840 -999.990 -999.990 1.110 ..P WKT 2010 07 11 17 29 55 31.3200 -97.3300 251.000 457.0 99.401 3.370 -999.990 -999.990 0.994 ..P WKT 2010 07 11 17 39 55 31.3200 -97.3300 251.000 30.0 99.415 2.790 -999.990 -999.990 0.994 ..P WKT 2010 07 11 17 44 55 31.3200 -97.3300 251.000 122.0 107.395 2.920 -999.990 -999.990 1.074 ..P WKT 2010 07 11 17 49 55 31.3200 -97.3300 251.000 457.0 98.882 3.210 -999.990 -999.990 0.989 ..P WKT 2010 07 11 17 54 55 31.3200 -97.3300 251.000 30.0 99.239 2.380 -999.990 -999.990 0.992 ..P WKT 2010 07 11 17 59 55 31.3200 -97.3300 251.000 122.0 105.696 1.870 -999.990 -999.990 1.057 ..P WKT 2010 07 11 18 04 55 31.3200 -97.3300 251.000 457.0 101.894 3.310 -999.990 -999.990 1.019 ..P WKT 2010 07 11 18 14 55 31.3200 -97.3300 251.000 30.0 102.391 2.200 -999.990 -999.990 1.024 ..P WKT 2010 07 11 18 19 55 31.3200 -97.3300 251.000 122.0 104.611 2.110 -999.990 -999.990 1.046 ..P WKT 2010 07 11 18 24 55 31.3200 -97.3300 251.000 457.0 98.649 4.340 -999.990 -999.990 0.986 ..P WKT 2010 07 11 18 29 55 31.3200 -97.3300 251.000 30.0 103.781 4.340 -999.990 -999.990 1.038 ..P WKT 2010 07 11 18 34 55 31.3200 -97.3300 251.000 122.0 105.585 3.070 -999.990 -999.990 1.056 ..P WKT 2010 07 11 18 39 55 31.3200 -97.3300 251.000 457.0 100.454 3.560 -999.990 -999.990 1.005 ..P WKT 2010 07 11 18 49 55 31.3200 -97.3300 251.000 30.0 94.828 3.920 -999.990 -999.990 0.948 ..P WKT 2010 07 11 18 54 55 31.3200 -97.3300 251.000 122.0 104.876 3.340 -999.990 -999.990 1.049 ..P WKT 2010 07 11 18 59 55 31.3200 -97.3300 251.000 457.0 98.277 2.800 -999.990 -999.990 0.983 ..P WKT 2010 07 11 19 04 55 31.3200 -97.3300 251.000 30.0 103.055 2.710 -999.990 -999.990 1.031 ..P WKT 2010 07 11 19 09 55 31.3200 -97.3300 251.000 122.0 111.996 2.350 -999.990 -999.990 1.120 ..P WKT 2010 07 11 19 14 55 31.3200 -97.3300 251.000 457.0 97.904 2.830 -999.990 -999.990 0.979 ..P WKT 2010 07 11 19 24 55 31.3200 -97.3300 251.000 30.0 108.334 2.580 -999.990 -999.990 1.083 ..P WKT 2010 07 11 19 29 55 31.3200 -97.3300 251.000 122.0 112.875 3.590 -999.990 -999.990 1.129 ..P WKT 2010 07 11 19 34 55 31.3200 -97.3300 251.000 457.0 103.260 4.300 -999.990 -999.990 1.033 ..P WKT 2010 07 11 19 39 55 31.3200 -97.3300 251.000 30.0 106.691 3.190 -999.990 -999.990 1.067 ..P WKT 2010 07 11 19 44 55 31.3200 -97.3300 251.000 122.0 112.900 3.110 -999.990 -999.990 1.129 ..P WKT 2010 07 11 19 49 55 31.3200 -97.3300 251.000 457.0 101.617 1.990 -999.990 -999.990 1.016 ..P WKT 2010 07 11 19 59 55 31.3200 -97.3300 251.000 30.0 105.903 2.780 -999.990 -999.990 1.059 ..P WKT 2010 07 11 20 04 55 31.3200 -97.3300 251.000 122.0 109.257 2.780 -999.990 -999.990 1.093 ..P WKT 2010 07 11 20 09 55 31.3200 -97.3300 251.000 457.0 98.169 2.310 -999.990 -999.990 0.982 ..P WKT 2010 07 11 20 14 55 31.3200 -97.3300 251.000 30.0 108.744 1.840 -999.990 -999.990 1.087 ..P WKT 2010 07 11 20 19 55 31.3200 -97.3300 251.000 122.0 112.654 2.420 -999.990 -999.990 1.127 ..P WKT 2010 07 11 20 24 55 31.3200 -97.3300 251.000 457.0 110.592 2.700 -999.990 -999.990 1.106 ..P WKT 2010 07 11 20 34 55 31.3200 -97.3300 251.000 30.0 104.682 2.710 -999.990 -999.990 1.047 ..P WKT 2010 07 11 20 39 55 31.3200 -97.3300 251.000 122.0 108.334 3.700 -999.990 -999.990 1.083 ..P WKT 2010 07 11 20 44 55 31.3200 -97.3300 251.000 457.0 100.178 2.090 -999.990 -999.990 1.002 ..P WKT 2010 07 11 20 49 55 31.3200 -97.3300 251.000 30.0 100.080 1.980 -999.990 -999.990 1.001 ..P WKT 2010 07 11 20 54 55 31.3200 -97.3300 251.000 122.0 104.289 2.870 -999.990 -999.990 1.043 ..P WKT 2010 07 11 20 59 55 31.3200 -97.3300 251.000 457.0 92.241 2.870 -999.990 -999.990 0.922 ..P WKT 2010 07 11 21 09 55 31.3200 -97.3300 251.000 30.0 100.699 2.020 -999.990 -999.990 1.007 ..P WKT 2010 07 11 21 14 55 31.3200 -97.3300 251.000 122.0 102.447 2.160 -999.990 -999.990 1.024 ..P WKT 2010 07 11 21 19 55 31.3200 -97.3300 251.000 457.0 98.357 2.120 -999.990 -999.990 0.984 ..P WKT 2010 07 11 21 24 55 31.3200 -97.3300 251.000 30.0 90.375 2.390 -999.990 -999.990 0.904 ..P WKT 2010 07 11 21 29 55 31.3200 -97.3300 251.000 122.0 105.607 2.740 -999.990 -999.990 1.056 ..P WKT 2010 07 11 21 34 55 31.3200 -97.3300 251.000 457.0 96.235 3.540 -999.990 -999.990 0.962 ..P WKT 2010 07 11 21 44 55 31.3200 -97.3300 251.000 30.0 93.912 3.610 -999.990 -999.990 0.939 ..P WKT 2010 07 11 21 49 55 31.3200 -97.3300 251.000 122.0 99.852 2.490 -999.990 -999.990 0.999 ..P WKT 2010 07 11 21 54 55 31.3200 -97.3300 251.000 457.0 94.111 3.930 -999.990 -999.990 0.941 ..P WKT 2010 07 11 21 59 55 31.3200 -97.3300 251.000 30.0 92.264 2.660 -999.990 -999.990 0.923 ..P WKT 2010 07 11 22 04 55 31.3200 -97.3300 251.000 122.0 100.013 2.010 -999.990 -999.990 1.000 ..P WKT 2010 07 11 22 09 55 31.3200 -97.3300 251.000 457.0 102.061 1.770 -999.990 -999.990 1.021 ..P WKT 2010 07 11 22 19 55 31.3200 -97.3300 251.000 30.0 96.141 1.960 -999.990 -999.990 0.961 ..P WKT 2010 07 11 22 24 55 31.3200 -97.3300 251.000 122.0 93.597 3.350 -999.990 -999.990 0.936 ..P WKT 2010 07 11 22 29 55 31.3200 -97.3300 251.000 457.0 95.367 3.050 -999.990 -999.990 0.954 ..P WKT 2010 07 11 22 34 55 31.3200 -97.3300 251.000 30.0 95.884 3.100 -999.990 -999.990 0.959 ..P WKT 2010 07 11 22 39 55 31.3200 -97.3300 251.000 122.0 108.368 3.520 -999.990 -999.990 1.084 ..P WKT 2010 07 11 22 44 55 31.3200 -97.3300 251.000 457.0 97.198 2.980 -999.990 -999.990 0.972 ..P WKT 2010 07 11 22 54 55 31.3200 -97.3300 251.000 30.0 102.031 4.150 -999.990 -999.990 1.020 ..P WKT 2010 07 11 22 59 55 31.3200 -97.3300 251.000 122.0 105.789 2.820 -999.990 -999.990 1.058 ..P WKT 2010 07 11 23 04 55 31.3200 -97.3300 251.000 457.0 100.362 2.700 -999.990 -999.990 1.004 ..P WKT 2010 07 11 23 09 55 31.3200 -97.3300 251.000 30.0 106.627 2.510 -999.990 -999.990 1.066 ..P WKT 2010 07 11 23 14 55 31.3200 -97.3300 251.000 122.0 106.489 2.350 -999.990 -999.990 1.065 ..P WKT 2010 07 11 23 19 55 31.3200 -97.3300 251.000 457.0 93.542 3.340 -999.990 -999.990 0.935 ..P WKT 2010 07 11 23 29 55 31.3200 -97.3300 251.000 30.0 99.725 2.480 -999.990 -999.990 0.997 ..P WKT 2010 07 11 23 34 55 31.3200 -97.3300 251.000 122.0 102.147 2.780 -999.990 -999.990 1.021 ..P WKT 2010 07 11 23 39 55 31.3200 -97.3300 251.000 457.0 102.064 3.650 -999.990 -999.990 1.021 ..P WKT 2010 07 11 23 44 55 31.3200 -97.3300 251.000 30.0 97.245 2.620 -999.990 -999.990 0.972 ..P WKT 2010 07 11 23 49 55 31.3200 -97.3300 251.000 122.0 99.111 4.110 -999.990 -999.990 0.991 ..P WKT 2010 07 12 00 09 55 31.3200 -97.3300 251.000 457.0 86.383 3.400 -999.990 -999.990 0.864 ..P WKT 2010 07 12 00 10 25 31.3200 -97.3300 251.000 457.0 94.726 2.270 -999.990 -999.990 0.947 ..P WKT 2010 07 12 00 10 55 31.3200 -97.3300 251.000 457.0 86.080 2.680 -999.990 -999.990 0.861 ..P WKT 2010 07 12 00 11 25 31.3200 -97.3300 251.000 457.0 90.802 2.250 -999.990 -999.990 0.908 ..P WKT 2010 07 12 00 11 55 31.3200 -97.3300 251.000 457.0 96.358 2.470 -999.990 -999.990 0.964 ..P WKT 2010 07 12 00 12 25 31.3200 -97.3300 251.000 457.0 87.155 3.100 -999.990 -999.990 0.872 ..P WKT 2010 07 12 00 12 55 31.3200 -97.3300 251.000 457.0 93.548 2.420 -999.990 -999.990 0.935 ..P WKT 2010 07 12 00 13 25 31.3200 -97.3300 251.000 457.0 92.143 2.250 -999.990 -999.990 0.921 ..P WKT 2010 07 12 00 13 55 31.3200 -97.3300 251.000 457.0 92.130 2.960 -999.990 -999.990 0.921 ..P WKT 2010 07 12 00 14 25 31.3200 -97.3300 251.000 457.0 94.067 3.400 -999.990 -999.990 0.941 ..P WKT 2010 07 12 00 14 55 31.3200 -97.3300 251.000 457.0 91.548 4.250 -999.990 -999.990 0.915 ..P WKT 2010 07 12 00 19 55 31.3200 -97.3300 251.000 30.0 88.637 3.440 -999.990 -999.990 0.886 ..P WKT 2010 07 12 00 24 55 31.3200 -97.3300 251.000 122.0 99.507 2.060 -999.990 -999.990 0.995 ..P WKT 2010 07 12 00 29 55 31.3200 -97.3300 251.000 457.0 91.724 2.110 -999.990 -999.990 0.917 ..P WKT 2010 07 12 00 34 55 31.3200 -97.3300 251.000 30.0 99.250 3.020 -999.990 -999.990 0.993 ..P WKT 2010 07 12 00 39 55 31.3200 -97.3300 251.000 122.0 94.254 3.490 -999.990 -999.990 0.943 ..P WKT 2010 07 12 00 44 55 31.3200 -97.3300 251.000 457.0 86.893 3.080 -999.990 -999.990 0.869 ..P WKT 2010 07 12 00 54 55 31.3200 -97.3300 251.000 30.0 86.813 2.870 -999.990 -999.990 0.868 ..P WKT 2010 07 12 00 59 55 31.3200 -97.3300 251.000 122.0 97.982 1.960 -999.990 -999.990 0.980 ..P WKT 2010 07 12 01 04 55 31.3200 -97.3300 251.000 457.0 89.686 1.790 -999.990 -999.990 0.897 ..P WKT 2010 07 12 01 09 55 31.3200 -97.3300 251.000 30.0 83.755 2.330 -999.990 -999.990 0.838 ..P WKT 2010 07 12 01 14 55 31.3200 -97.3300 251.000 122.0 95.891 1.900 -999.990 -999.990 0.959 ..P WKT 2010 07 12 01 19 55 31.3200 -97.3300 251.000 457.0 84.821 3.320 -999.990 -999.990 0.848 ..P WKT 2010 07 12 01 29 55 31.3200 -97.3300 251.000 30.0 97.832 2.710 -999.990 -999.990 0.978 ..P WKT 2010 07 12 01 34 55 31.3200 -97.3300 251.000 122.0 98.293 1.740 -999.990 -999.990 0.983 ..P WKT 2010 07 12 01 39 55 31.3200 -97.3300 251.000 457.0 96.532 1.980 -999.990 -999.990 0.965 ..P WKT 2010 07 12 01 44 55 31.3200 -97.3300 251.000 30.0 92.134 1.720 -999.990 -999.990 0.921 ..P WKT 2010 07 12 01 49 55 31.3200 -97.3300 251.000 122.0 93.012 2.060 -999.990 -999.990 0.930 ..P WKT 2010 07 12 01 54 55 31.3200 -97.3300 251.000 457.0 83.898 1.750 -999.990 -999.990 0.839 ..P WKT 2010 07 12 02 04 55 31.3200 -97.3300 251.000 30.0 97.033 1.760 -999.990 -999.990 0.970 ..P WKT 2010 07 12 02 09 55 31.3200 -97.3300 251.000 122.0 95.551 1.680 -999.990 -999.990 0.956 ..P WKT 2010 07 12 02 14 55 31.3200 -97.3300 251.000 457.0 83.807 2.120 -999.990 -999.990 0.838 ..P WKT 2010 07 12 02 19 55 31.3200 -97.3300 251.000 30.0 96.056 2.380 -999.990 -999.990 0.961 ..P WKT 2010 07 12 02 24 55 31.3200 -97.3300 251.000 122.0 93.190 2.130 -999.990 -999.990 0.932 ..P WKT 2010 07 12 02 29 55 31.3200 -97.3300 251.000 457.0 89.492 1.900 -999.990 -999.990 0.895 ..P WKT 2010 07 12 02 39 55 31.3200 -97.3300 251.000 30.0 93.443 2.600 -999.990 -999.990 0.934 ..P WKT 2010 07 12 02 44 55 31.3200 -97.3300 251.000 122.0 96.655 2.810 -999.990 -999.990 0.967 ..P WKT 2010 07 12 02 49 55 31.3200 -97.3300 251.000 457.0 90.169 3.650 -999.990 -999.990 0.902 ..P WKT 2010 07 12 02 54 55 31.3200 -97.3300 251.000 30.0 97.813 2.950 -999.990 -999.990 0.978 ..P WKT 2010 07 12 02 59 55 31.3200 -97.3300 251.000 122.0 98.253 2.840 -999.990 -999.990 0.983 ..P WKT 2010 07 12 03 04 55 31.3200 -97.3300 251.000 457.0 82.354 2.190 -999.990 -999.990 0.824 ..P WKT 2010 07 12 03 14 55 31.3200 -97.3300 251.000 30.0 94.313 2.500 -999.990 -999.990 0.943 ..P WKT 2010 07 12 03 19 55 31.3200 -97.3300 251.000 122.0 97.244 2.680 -999.990 -999.990 0.972 ..P WKT 2010 07 12 03 24 55 31.3200 -97.3300 251.000 457.0 88.550 3.010 -999.990 -999.990 0.885 ..P WKT 2010 07 12 03 29 55 31.3200 -97.3300 251.000 30.0 101.167 2.930 -999.990 -999.990 1.012 ..P WKT 2010 07 12 03 34 55 31.3200 -97.3300 251.000 122.0 93.859 2.680 -999.990 -999.990 0.939 ..P WKT 2010 07 12 03 39 55 31.3200 -97.3300 251.000 457.0 92.363 2.240 -999.990 -999.990 0.924 ..P WKT 2010 07 12 03 49 55 31.3200 -97.3300 251.000 30.0 94.765 2.820 -999.990 -999.990 0.948 ..P WKT 2010 07 12 03 54 55 31.3200 -97.3300 251.000 122.0 92.025 2.250 -999.990 -999.990 0.920 ..P WKT 2010 07 12 03 59 55 31.3200 -97.3300 251.000 457.0 83.204 3.930 -999.990 -999.990 0.832 ..P WKT 2010 07 12 04 04 55 31.3200 -97.3300 251.000 30.0 93.458 2.500 -999.990 -999.990 0.935 ..P WKT 2010 07 12 04 09 55 31.3200 -97.3300 251.000 122.0 93.206 2.370 -999.990 -999.990 0.932 ..P WKT 2010 07 12 04 14 55 31.3200 -97.3300 251.000 457.0 81.765 3.260 -999.990 -999.990 0.818 ..P WKT 2010 07 12 04 24 55 31.3200 -97.3300 251.000 30.0 99.891 3.210 -999.990 -999.990 0.999 ..P WKT 2010 07 12 04 29 55 31.3200 -97.3300 251.000 122.0 98.101 2.160 -999.990 -999.990 0.981 ..P WKT 2010 07 12 04 34 55 31.3200 -97.3300 251.000 457.0 86.094 1.910 -999.990 -999.990 0.861 ..P WKT 2010 07 12 04 39 55 31.3200 -97.3300 251.000 30.0 102.389 2.960 -999.990 -999.990 1.024 ..P WKT 2010 07 12 04 44 55 31.3200 -97.3300 251.000 122.0 97.978 1.960 -999.990 -999.990 0.980 ..P WKT 2010 07 12 04 49 55 31.3200 -97.3300 251.000 457.0 86.390 2.710 -999.990 -999.990 0.864 ..P WKT 2010 07 12 05 04 55 31.3200 -97.3300 251.000 30.0 92.538 2.320 -999.990 -999.990 0.925 ..P WKT 2010 07 12 05 09 55 31.3200 -97.3300 251.000 122.0 95.125 2.490 -999.990 -999.990 0.951 ..P WKT 2010 07 12 05 14 55 31.3200 -97.3300 251.000 457.0 85.853 3.330 -999.990 -999.990 0.859 ..P WKT 2010 07 12 05 19 55 31.3200 -97.3300 251.000 30.0 90.094 3.200 -999.990 -999.990 0.901 ..P WKT 2010 07 12 05 24 55 31.3200 -97.3300 251.000 122.0 94.746 3.010 -999.990 -999.990 0.947 ..P WKT 2010 07 12 05 29 55 31.3200 -97.3300 251.000 457.0 86.443 3.420 -999.990 -999.990 0.864 ..P WKT 2010 07 12 05 39 55 31.3200 -97.3300 251.000 30.0 94.526 3.130 -999.990 -999.990 0.945 ..P WKT 2010 07 12 05 44 55 31.3200 -97.3300 251.000 122.0 97.818 3.530 -999.990 -999.990 0.978 ..P WKT 2010 07 12 05 49 55 31.3200 -97.3300 251.000 457.0 81.965 2.750 -999.990 -999.990 0.820 ..P WKT 2010 07 12 05 54 55 31.3200 -97.3300 251.000 30.0 87.873 2.830 -999.990 -999.990 0.879 ..P WKT 2010 07 12 05 59 55 31.3200 -97.3300 251.000 122.0 92.266 3.930 -999.990 -999.990 0.923 ..P WKT 2010 07 12 06 04 55 31.3200 -97.3300 251.000 457.0 75.595 2.450 -999.990 -999.990 0.756 ..P WKT 2010 07 12 06 14 55 31.3200 -97.3300 251.000 30.0 92.343 2.550 -999.990 -999.990 0.923 ..P WKT 2010 07 12 06 19 55 31.3200 -97.3300 251.000 122.0 94.098 2.590 -999.990 -999.990 0.941 ..P WKT 2010 07 12 06 24 55 31.3200 -97.3300 251.000 457.0 84.296 2.770 -999.990 -999.990 0.843 ..P WKT 2010 07 12 06 29 55 31.3200 -97.3300 251.000 30.0 86.052 4.020 -999.990 -999.990 0.861 ..P WKT 2010 07 12 06 34 55 31.3200 -97.3300 251.000 122.0 91.108 3.110 -999.990 -999.990 0.911 ..P WKT 2010 07 12 06 39 55 31.3200 -97.3300 251.000 457.0 83.787 2.030 -999.990 -999.990 0.838 ..P WKT 2010 07 12 06 49 55 31.3200 -97.3300 251.000 30.0 96.899 3.190 -999.990 -999.990 0.969 ..P WKT 2010 07 12 06 54 55 31.3200 -97.3300 251.000 122.0 94.234 3.000 -999.990 -999.990 0.942 ..P WKT 2010 07 12 06 59 55 31.3200 -97.3300 251.000 457.0 82.500 4.160 -999.990 -999.990 0.825 ..P WKT 2010 07 12 07 04 55 31.3200 -97.3300 251.000 30.0 100.721 2.600 -999.990 -999.990 1.007 ..P WKT 2010 07 12 07 09 55 31.3200 -97.3300 251.000 122.0 103.551 2.540 -999.990 -999.990 1.036 ..P WKT 2010 07 12 07 14 55 31.3200 -97.3300 251.000 457.0 80.010 3.320 -999.990 -999.990 0.800 ..P WKT 2010 07 12 07 24 55 31.3200 -97.3300 251.000 30.0 95.992 2.040 -999.990 -999.990 0.960 ..P WKT 2010 07 12 07 29 55 31.3200 -97.3300 251.000 122.0 97.605 2.170 -999.990 -999.990 0.976 ..P WKT 2010 07 12 07 34 55 31.3200 -97.3300 251.000 457.0 83.296 3.220 -999.990 -999.990 0.833 ..P WKT 2010 07 12 07 39 55 31.3200 -97.3300 251.000 30.0 94.517 3.190 -999.990 -999.990 0.945 ..P WKT 2010 07 12 07 44 55 31.3200 -97.3300 251.000 122.0 98.874 2.170 -999.990 -999.990 0.989 ..P WKT 2010 07 12 07 49 55 31.3200 -97.3300 251.000 457.0 88.962 2.640 -999.990 -999.990 0.890 ..P WKT 2010 07 12 07 59 55 31.3200 -97.3300 251.000 30.0 88.799 2.800 -999.990 -999.990 0.888 ..P WKT 2010 07 12 08 04 55 31.3200 -97.3300 251.000 122.0 90.587 2.900 -999.990 -999.990 0.906 ..P WKT 2010 07 12 08 09 55 31.3200 -97.3300 251.000 457.0 79.214 2.730 -999.990 -999.990 0.792 ..P WKT 2010 07 12 08 14 55 31.3200 -97.3300 251.000 30.0 87.309 3.860 -999.990 -999.990 0.873 ..P WKT 2010 07 12 08 19 55 31.3200 -97.3300 251.000 122.0 88.824 3.500 -999.990 -999.990 0.888 ..P WKT 2010 07 12 08 24 55 31.3200 -97.3300 251.000 457.0 86.226 4.700 -999.990 -999.990 0.862 ..P WKT 2010 07 12 08 34 55 31.3200 -97.3300 251.000 30.0 84.185 4.570 -999.990 -999.990 0.842 ..P WKT 2010 07 12 08 39 55 31.3200 -97.3300 251.000 122.0 95.423 3.980 -999.990 -999.990 0.954 ..P WKT 2010 07 12 08 44 55 31.3200 -97.3300 251.000 457.0 83.651 4.260 -999.990 -999.990 0.837 ..P WKT 2010 07 12 08 49 55 31.3200 -97.3300 251.000 30.0 88.998 3.820 -999.990 -999.990 0.890 ..P WKT 2010 07 12 08 54 55 31.3200 -97.3300 251.000 122.0 90.510 4.020 -999.990 -999.990 0.905 ..P WKT 2010 07 12 08 59 55 31.3200 -97.3300 251.000 457.0 86.821 3.660 -999.990 -999.990 0.868 ..P WKT 2010 07 12 09 09 55 31.3200 -97.3300 251.000 30.0 91.447 4.650 -999.990 -999.990 0.914 ..P WKT 2010 07 12 09 14 55 31.3200 -97.3300 251.000 122.0 97.844 4.000 -999.990 -999.990 0.978 ..P WKT 2010 07 12 09 19 55 31.3200 -97.3300 251.000 457.0 88.781 5.290 -999.990 -999.990 0.888 ..P WKT 2010 07 12 09 24 55 31.3200 -97.3300 251.000 30.0 86.697 3.240 -999.990 -999.990 0.867 ..P WKT 2010 07 12 09 29 55 31.3200 -97.3300 251.000 122.0 92.408 3.670 -999.990 -999.990 0.924 ..P WKT 2010 07 12 09 34 55 31.3200 -97.3300 251.000 457.0 81.710 5.030 -999.990 -999.990 0.817 ..P WKT 2010 07 12 09 44 55 31.3200 -97.3300 251.000 30.0 90.942 3.410 -999.990 -999.990 0.909 ..P WKT 2010 07 12 09 49 55 31.3200 -97.3300 251.000 122.0 91.181 3.210 -999.990 -999.990 0.912 ..P WKT 2010 07 12 09 54 55 31.3200 -97.3300 251.000 457.0 83.224 3.080 -999.990 -999.990 0.832 ..P WKT 2010 07 12 09 59 55 31.3200 -97.3300 251.000 30.0 84.831 5.130 -999.990 -999.990 0.848 ..P WKT 2010 07 12 10 04 55 31.3200 -97.3300 251.000 122.0 91.902 3.060 -999.990 -999.990 0.919 ..P WKT 2010 07 12 10 09 55 31.3200 -97.3300 251.000 457.0 85.997 3.180 -999.990 -999.990 0.860 ..P WKT 2010 07 12 10 19 55 31.3200 -97.3300 251.000 30.0 96.756 3.590 -999.990 -999.990 0.968 ..P WKT 2010 07 12 10 24 55 31.3200 -97.3300 251.000 122.0 95.669 3.360 -999.990 -999.990 0.957 ..P WKT 2010 07 12 10 29 55 31.3200 -97.3300 251.000 457.0 86.394 3.560 -999.990 -999.990 0.864 ..P WKT 2010 07 12 10 34 55 31.3200 -97.3300 251.000 30.0 86.400 3.640 -999.990 -999.990 0.864 ..P WKT 2010 07 12 10 39 55 31.3200 -97.3300 251.000 122.0 89.136 3.270 -999.990 -999.990 0.891 ..P WKT 2010 07 12 10 44 55 31.3200 -97.3300 251.000 457.0 84.504 3.310 -999.990 -999.990 0.845 ..P WKT 2010 07 12 10 54 55 31.3200 -97.3300 251.000 30.0 85.765 3.150 -999.990 -999.990 0.858 ..P WKT 2010 07 12 10 59 55 31.3200 -97.3300 251.000 122.0 82.656 3.410 -999.990 -999.990 0.827 ..P WKT 2010 07 12 11 04 55 31.3200 -97.3300 251.000 457.0 79.820 3.560 -999.990 -999.990 0.798 ..P WKT 2010 07 12 11 09 55 31.3200 -97.3300 251.000 30.0 86.253 3.120 -999.990 -999.990 0.863 ..P WKT 2010 07 12 11 14 55 31.3200 -97.3300 251.000 122.0 92.956 3.450 -999.990 -999.990 0.930 ..P WKT 2010 07 12 11 19 55 31.3200 -97.3300 251.000 457.0 81.128 3.320 -999.990 -999.990 0.811 ..P WKT 2010 07 12 11 29 55 31.3200 -97.3300 251.000 30.0 95.152 3.600 -999.990 -999.990 0.952 ..P WKT 2010 07 12 11 34 55 31.3200 -97.3300 251.000 122.0 94.029 3.390 -999.990 -999.990 0.940 ..P WKT 2010 07 12 11 39 55 31.3200 -97.3300 251.000 457.0 95.085 3.720 -999.990 -999.990 0.951 ..P WKT 2010 07 12 11 44 55 31.3200 -97.3300 251.000 30.0 101.859 4.830 -999.990 -999.990 1.019 ..P WKT 2010 07 12 11 49 55 31.3200 -97.3300 251.000 122.0 93.929 4.080 -999.990 -999.990 0.939 ..P WKT 2010 07 12 12 09 55 31.3200 -97.3300 251.000 457.0 91.352 3.770 -999.990 -999.990 0.914 ..P WKT 2010 07 12 12 10 25 31.3200 -97.3300 251.000 457.0 94.526 4.070 -999.990 -999.990 0.945 ..P WKT 2010 07 12 12 10 55 31.3200 -97.3300 251.000 457.0 93.344 4.050 -999.990 -999.990 0.933 ..P WKT 2010 07 12 12 11 25 31.3200 -97.3300 251.000 457.0 91.345 3.540 -999.990 -999.990 0.913 ..P WKT 2010 07 12 12 11 55 31.3200 -97.3300 251.000 457.0 91.388 3.810 -999.990 -999.990 0.914 ..P WKT 2010 07 12 12 12 25 31.3200 -97.3300 251.000 457.0 92.248 5.020 -999.990 -999.990 0.922 ..P WKT 2010 07 12 12 12 55 31.3200 -97.3300 251.000 457.0 95.014 4.700 -999.990 -999.990 0.950 ..P WKT 2010 07 12 12 13 25 31.3200 -97.3300 251.000 457.0 92.742 3.710 -999.990 -999.990 0.927 ..P WKT 2010 07 12 12 13 55 31.3200 -97.3300 251.000 457.0 92.377 3.720 -999.990 -999.990 0.924 ..P WKT 2010 07 12 12 14 25 31.3200 -97.3300 251.000 457.0 90.650 3.570 -999.990 -999.990 0.907 ..P WKT 2010 07 12 12 14 55 31.3200 -97.3300 251.000 457.0 89.331 4.180 -999.990 -999.990 0.893 ..P WKT 2010 07 12 12 19 55 31.3200 -97.3300 251.000 30.0 95.208 4.370 -999.990 -999.990 0.952 ..P WKT 2010 07 12 12 24 55 31.3200 -97.3300 251.000 122.0 95.503 5.220 -999.990 -999.990 0.955 ..P WKT 2010 07 12 12 29 55 31.3200 -97.3300 251.000 457.0 85.443 4.670 -999.990 -999.990 0.854 ..P WKT 2010 07 12 12 34 55 31.3200 -97.3300 251.000 30.0 98.819 3.780 -999.990 -999.990 0.988 ..P WKT 2010 07 12 12 39 55 31.3200 -97.3300 251.000 122.0 95.570 4.340 -999.990 -999.990 0.956 ..P WKT 2010 07 12 12 44 55 31.3200 -97.3300 251.000 457.0 80.595 5.480 -999.990 -999.990 0.806 ..P WKT 2010 07 12 12 54 55 31.3200 -97.3300 251.000 30.0 89.344 5.570 -999.990 -999.990 0.893 ..P WKT 2010 07 12 12 59 55 31.3200 -97.3300 251.000 122.0 97.940 4.670 -999.990 -999.990 0.979 ..P WKT 2010 07 12 13 04 55 31.3200 -97.3300 251.000 457.0 79.112 4.200 -999.990 -999.990 0.791 ..P WKT 2010 07 12 13 09 55 31.3200 -97.3300 251.000 30.0 85.116 3.810 -999.990 -999.990 0.851 ..P WKT 2010 07 12 13 14 55 31.3200 -97.3300 251.000 122.0 93.309 4.040 -999.990 -999.990 0.933 ..P WKT 2010 07 12 13 19 55 31.3200 -97.3300 251.000 457.0 77.880 3.590 -999.990 -999.990 0.779 ..P WKT 2010 07 12 13 29 55 31.3200 -97.3300 251.000 30.0 89.998 4.090 -999.990 -999.990 0.900 ..P WKT 2010 07 12 13 34 55 31.3200 -97.3300 251.000 122.0 95.427 4.000 -999.990 -999.990 0.954 ..P WKT 2010 07 12 13 39 55 31.3200 -97.3300 251.000 457.0 82.543 3.620 -999.990 -999.990 0.825 ..P WKT 2010 07 12 13 44 55 31.3200 -97.3300 251.000 30.0 90.022 3.770 -999.990 -999.990 0.900 ..P WKT 2010 07 12 13 49 55 31.3200 -97.3300 251.000 122.0 88.618 3.650 -999.990 -999.990 0.886 ..P WKT 2010 07 12 13 54 55 31.3200 -97.3300 251.000 457.0 85.161 4.560 -999.990 -999.990 0.852 ..P WKT 2010 07 12 14 04 55 31.3200 -97.3300 251.000 30.0 83.070 4.220 -999.990 -999.990 0.831 ..P WKT 2010 07 12 14 09 55 31.3200 -97.3300 251.000 122.0 90.325 3.890 -999.990 -999.990 0.903 ..P WKT 2010 07 12 14 14 55 31.3200 -97.3300 251.000 457.0 83.344 3.340 -999.990 -999.990 0.833 ..P WKT 2010 07 12 14 19 55 31.3200 -97.3300 251.000 30.0 87.864 3.290 -999.990 -999.990 0.879 ..P WKT 2010 07 12 14 24 55 31.3200 -97.3300 251.000 122.0 95.123 3.760 -999.990 -999.990 0.951 ..P WKT 2010 07 12 14 29 55 31.3200 -97.3300 251.000 457.0 87.865 3.240 -999.990 -999.990 0.879 ..P WKT 2010 07 12 14 39 55 31.3200 -97.3300 251.000 30.0 97.148 3.270 -999.990 -999.990 0.971 ..P WKT 2010 07 12 14 44 55 31.3200 -97.3300 251.000 122.0 99.717 3.660 -999.990 -999.990 0.997 ..P WKT 2010 07 12 14 49 55 31.3200 -97.3300 251.000 457.0 90.495 3.500 -999.990 -999.990 0.905 ..P WKT 2010 07 12 14 54 55 31.3200 -97.3300 251.000 30.0 92.515 4.090 -999.990 -999.990 0.925 ..P WKT 2010 07 12 14 59 55 31.3200 -97.3300 251.000 122.0 96.730 4.020 -999.990 -999.990 0.967 ..P WKT 2010 07 12 15 04 55 31.3200 -97.3300 251.000 457.0 90.794 4.300 -999.990 -999.990 0.908 ..P WKT 2010 07 12 15 14 55 31.3200 -97.3300 251.000 30.0 92.563 4.200 -999.990 -999.990 0.926 ..P WKT 2010 07 12 15 19 55 31.3200 -97.3300 251.000 122.0 101.098 4.000 -999.990 -999.990 1.011 ..P WKT 2010 07 12 15 24 55 31.3200 -97.3300 251.000 457.0 93.705 3.820 -999.990 -999.990 0.937 ..P WKT 2010 07 12 15 29 55 31.3200 -97.3300 251.000 30.0 99.497 3.960 -999.990 -999.990 0.995 ..P WKT 2010 07 12 15 34 55 31.3200 -97.3300 251.000 122.0 102.268 3.840 -999.990 -999.990 1.023 ..P WKT 2010 07 12 15 39 55 31.3200 -97.3300 251.000 457.0 98.445 5.760 -999.990 -999.990 0.984 ..P WKT 2010 07 12 15 49 55 31.3200 -97.3300 251.000 30.0 90.831 4.710 -999.990 -999.990 0.908 ..P WKT 2010 07 12 15 54 55 31.3200 -97.3300 251.000 122.0 95.018 3.490 -999.990 -999.990 0.950 ..P WKT 2010 07 12 15 59 55 31.3200 -97.3300 251.000 457.0 88.752 3.470 -999.990 -999.990 0.888 ..P WKT 2010 07 12 16 04 55 31.3200 -97.3300 251.000 30.0 94.316 3.550 -999.990 -999.990 0.943 ..P WKT 2010 07 12 16 09 55 31.3200 -97.3300 251.000 122.0 101.396 4.380 -999.990 -999.990 1.014 ..P WKT 2010 07 12 16 14 55 31.3200 -97.3300 251.000 457.0 94.439 3.520 -999.990 -999.990 0.944 ..P WKT 2010 07 12 16 24 55 31.3200 -97.3300 251.000 30.0 101.173 4.350 -999.990 -999.990 1.012 ..P WKT 2010 07 12 16 29 55 31.3200 -97.3300 251.000 122.0 112.117 3.690 -999.990 -999.990 1.121 ..P WKT 2010 07 12 16 34 55 31.3200 -97.3300 251.000 457.0 101.712 3.530 -999.990 -999.990 1.017 ..P WKT 2010 07 12 16 39 55 31.3200 -97.3300 251.000 30.0 97.228 3.290 -999.990 -999.990 0.972 ..P WKT 2010 07 12 16 44 55 31.3200 -97.3300 251.000 122.0 107.766 3.130 -999.990 -999.990 1.078 ..P WKT 2010 07 12 16 49 55 31.3200 -97.3300 251.000 457.0 98.594 2.830 -999.990 -999.990 0.986 ..P WKT 2010 07 12 17 04 55 31.3200 -97.3300 251.000 30.0 105.118 3.850 -999.990 -999.990 1.051 ..P WKT 2010 07 12 17 09 55 31.3200 -97.3300 251.000 122.0 105.454 4.010 -999.990 -999.990 1.055 ..P WKT 2010 07 12 17 14 55 31.3200 -97.3300 251.000 457.0 95.713 4.620 -999.990 -999.990 0.957 ..P WKT 2010 07 12 17 19 55 31.3200 -97.3300 251.000 30.0 97.979 4.710 -999.990 -999.990 0.980 ..P WKT 2010 07 12 17 24 55 31.3200 -97.3300 251.000 122.0 103.284 3.790 -999.990 -999.990 1.033 ..P WKT 2010 07 12 17 29 55 31.3200 -97.3300 251.000 457.0 95.195 4.820 -999.990 -999.990 0.952 ..P WKT 2010 07 12 17 39 55 31.3200 -97.3300 251.000 30.0 95.472 3.870 -999.990 -999.990 0.955 ..P WKT 2010 07 12 17 44 55 31.3200 -97.3300 251.000 122.0 100.667 4.270 -999.990 -999.990 1.007 ..P WKT 2010 07 12 17 49 55 31.3200 -97.3300 251.000 457.0 97.571 4.680 -999.990 -999.990 0.976 ..P WKT 2010 07 12 17 54 55 31.3200 -97.3300 251.000 30.0 98.483 3.630 -999.990 -999.990 0.985 ..P WKT 2010 07 12 17 59 55 31.3200 -97.3300 251.000 122.0 101.055 3.950 -999.990 -999.990 1.011 ..P WKT 2010 07 12 18 04 55 31.3200 -97.3300 251.000 457.0 99.202 3.510 -999.990 -999.990 0.992 ..P WKT 2010 07 12 18 14 55 31.3200 -97.3300 251.000 30.0 92.408 3.090 -999.990 -999.990 0.924 ..P WKT 2010 07 12 18 19 55 31.3200 -97.3300 251.000 122.0 100.064 3.640 -999.990 -999.990 1.001 ..P WKT 2010 07 12 18 24 55 31.3200 -97.3300 251.000 457.0 96.369 3.590 -999.990 -999.990 0.964 ..P WKT 2010 07 12 18 29 55 31.3200 -97.3300 251.000 30.0 99.874 3.580 -999.990 -999.990 0.999 ..P WKT 2010 07 12 18 34 55 31.3200 -97.3300 251.000 122.0 110.307 4.620 -999.990 -999.990 1.103 ..P WKT 2010 07 12 18 39 55 31.3200 -97.3300 251.000 457.0 109.383 3.700 -999.990 -999.990 1.094 ..P WKT 2010 07 12 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 07 12 18 54 55 31.3200 -97.3300 251.000 122.0 112.709 3.500 -999.990 -999.990 1.127 ..P WKT 2010 07 12 18 59 55 31.3200 -97.3300 251.000 457.0 104.296 4.060 -999.990 -999.990 1.043 ..P WKT 2010 07 12 19 04 55 31.3200 -97.3300 251.000 30.0 105.035 4.790 -999.990 -999.990 1.050 ..P WKT 2010 07 12 19 09 55 31.3200 -97.3300 251.000 122.0 110.213 4.550 -999.990 -999.990 1.102 ..P WKT 2010 07 12 19 14 55 31.3200 -97.3300 251.000 457.0 101.238 4.340 -999.990 -999.990 1.012 ..P WKT 2010 07 12 19 24 55 31.3200 -97.3300 251.000 30.0 103.190 3.940 -999.990 -999.990 1.032 ..P WKT 2010 07 12 19 29 55 31.3200 -97.3300 251.000 122.0 103.572 4.390 -999.990 -999.990 1.036 ..P WKT 2010 07 12 19 34 55 31.3200 -97.3300 251.000 457.0 100.342 4.350 -999.990 -999.990 1.003 ..P WKT 2010 07 12 19 39 55 31.3200 -97.3300 251.000 30.0 101.001 3.990 -999.990 -999.990 1.010 ..P WKT 2010 07 12 19 44 55 31.3200 -97.3300 251.000 122.0 100.827 3.960 -999.990 -999.990 1.008 ..P WKT 2010 07 12 19 49 55 31.3200 -97.3300 251.000 457.0 98.706 3.840 -999.990 -999.990 0.987 ..P WKT 2010 07 12 19 59 55 31.3200 -97.3300 251.000 30.0 87.429 3.930 -999.990 -999.990 0.874 ..P WKT 2010 07 12 20 04 55 31.3200 -97.3300 251.000 122.0 96.213 3.880 -999.990 -999.990 0.962 ..P WKT 2010 07 12 20 09 55 31.3200 -97.3300 251.000 457.0 89.558 4.540 -999.990 -999.990 0.896 ..P WKT 2010 07 12 20 14 55 31.3200 -97.3300 251.000 30.0 85.543 3.930 -999.990 -999.990 0.855 ..P WKT 2010 07 12 20 19 55 31.3200 -97.3300 251.000 122.0 91.549 4.610 -999.990 -999.990 0.915 ..P WKT 2010 07 12 20 24 55 31.3200 -97.3300 251.000 457.0 84.889 3.880 -999.990 -999.990 0.849 ..P WKT 2010 07 12 20 34 55 31.3200 -97.3300 251.000 30.0 90.442 3.490 -999.990 -999.990 0.904 ..P WKT 2010 07 12 20 39 55 31.3200 -97.3300 251.000 122.0 93.330 4.050 -999.990 -999.990 0.933 ..P WKT 2010 07 12 20 44 55 31.3200 -97.3300 251.000 457.0 90.784 4.030 -999.990 -999.990 0.908 ..P WKT 2010 07 12 20 49 55 31.3200 -97.3300 251.000 30.0 90.606 4.020 -999.990 -999.990 0.906 ..P WKT 2010 07 12 20 54 55 31.3200 -97.3300 251.000 122.0 94.193 4.030 -999.990 -999.990 0.942 ..P WKT 2010 07 12 20 59 55 31.3200 -97.3300 251.000 457.0 89.972 3.740 -999.990 -999.990 0.900 ..P WKT 2010 07 12 21 09 55 31.3200 -97.3300 251.000 30.0 91.869 4.720 -999.990 -999.990 0.919 ..P WKT 2010 07 12 21 14 55 31.3200 -97.3300 251.000 122.0 93.526 4.130 -999.990 -999.990 0.935 ..P WKT 2010 07 12 21 19 55 31.3200 -97.3300 251.000 457.0 93.928 3.520 -999.990 -999.990 0.939 ..P WKT 2010 07 12 21 24 55 31.3200 -97.3300 251.000 30.0 97.820 3.740 -999.990 -999.990 0.978 ..P WKT 2010 07 12 21 29 55 31.3200 -97.3300 251.000 122.0 99.898 4.060 -999.990 -999.990 0.999 ..P WKT 2010 07 12 21 34 55 31.3200 -97.3300 251.000 457.0 86.752 4.150 -999.990 -999.990 0.868 ..P WKT 2010 07 12 21 44 55 31.3200 -97.3300 251.000 30.0 96.396 3.250 -999.990 -999.990 0.964 ..P WKT 2010 07 12 21 49 55 31.3200 -97.3300 251.000 122.0 95.860 3.430 -999.990 -999.990 0.959 ..P WKT 2010 07 12 21 54 55 31.3200 -97.3300 251.000 457.0 94.066 3.160 -999.990 -999.990 0.941 ..P WKT 2010 07 12 21 59 55 31.3200 -97.3300 251.000 30.0 90.732 3.660 -999.990 -999.990 0.907 ..P WKT 2010 07 12 22 04 55 31.3200 -97.3300 251.000 122.0 101.384 3.910 -999.990 -999.990 1.014 ..P WKT 2010 07 12 22 09 55 31.3200 -97.3300 251.000 457.0 87.558 3.340 -999.990 -999.990 0.876 ..P WKT 2010 07 12 22 19 55 31.3200 -97.3300 251.000 30.0 91.939 3.290 -999.990 -999.990 0.919 ..P WKT 2010 07 12 22 24 55 31.3200 -97.3300 251.000 122.0 100.642 4.240 -999.990 -999.990 1.006 ..P WKT 2010 07 12 22 29 55 31.3200 -97.3300 251.000 457.0 88.063 3.320 -999.990 -999.990 0.881 ..P WKT 2010 07 12 22 34 55 31.3200 -97.3300 251.000 30.0 89.765 3.590 -999.990 -999.990 0.898 ..P WKT 2010 07 12 22 39 55 31.3200 -97.3300 251.000 122.0 97.912 4.680 -999.990 -999.990 0.979 ..P WKT 2010 07 12 22 44 55 31.3200 -97.3300 251.000 457.0 95.974 3.700 -999.990 -999.990 0.960 ..P WKT 2010 07 12 22 54 55 31.3200 -97.3300 251.000 30.0 90.713 4.100 -999.990 -999.990 0.907 ..P WKT 2010 07 12 22 59 55 31.3200 -97.3300 251.000 122.0 97.766 3.740 -999.990 -999.990 0.978 ..P WKT 2010 07 12 23 04 55 31.3200 -97.3300 251.000 457.0 91.358 4.000 -999.990 -999.990 0.914 ..P WKT 2010 07 12 23 09 55 31.3200 -97.3300 251.000 30.0 91.962 3.920 -999.990 -999.990 0.920 ..P WKT 2010 07 12 23 14 55 31.3200 -97.3300 251.000 122.0 100.704 4.530 -999.990 -999.990 1.007 ..P WKT 2010 07 12 23 19 55 31.3200 -97.3300 251.000 457.0 93.730 4.070 -999.990 -999.990 0.937 ..P WKT 2010 07 12 23 29 55 31.3200 -97.3300 251.000 30.0 101.747 4.500 -999.990 -999.990 1.017 ..P WKT 2010 07 12 23 34 55 31.3200 -97.3300 251.000 122.0 102.422 4.170 -999.990 -999.990 1.024 ..P WKT 2010 07 12 23 39 55 31.3200 -97.3300 251.000 457.0 103.377 3.910 -999.990 -999.990 1.034 ..P WKT 2010 07 12 23 44 55 31.3200 -97.3300 251.000 30.0 99.695 5.270 -999.990 -999.990 0.997 ..P WKT 2010 07 12 23 49 55 31.3200 -97.3300 251.000 122.0 102.618 3.400 -999.990 -999.990 1.026 ..P WKT 2010 07 13 00 09 55 31.3200 -97.3300 251.000 457.0 90.897 4.890 -999.990 -999.990 0.909 ..P WKT 2010 07 13 00 10 25 31.3200 -97.3300 251.000 457.0 87.447 4.060 -999.990 -999.990 0.874 ..P WKT 2010 07 13 00 10 55 31.3200 -97.3300 251.000 457.0 93.978 3.110 -999.990 -999.990 0.940 ..P WKT 2010 07 13 00 11 25 31.3200 -97.3300 251.000 457.0 96.572 3.650 -999.990 -999.990 0.966 ..P WKT 2010 07 13 00 11 55 31.3200 -97.3300 251.000 457.0 93.826 3.480 -999.990 -999.990 0.938 ..P WKT 2010 07 13 00 12 25 31.3200 -97.3300 251.000 457.0 92.203 3.350 -999.990 -999.990 0.922 ..P WKT 2010 07 13 00 12 55 31.3200 -97.3300 251.000 457.0 96.624 3.790 -999.990 -999.990 0.966 ..P WKT 2010 07 13 00 13 25 31.3200 -97.3300 251.000 457.0 90.364 3.640 -999.990 -999.990 0.904 ..P WKT 2010 07 13 00 13 55 31.3200 -97.3300 251.000 457.0 90.148 3.970 -999.990 -999.990 0.901 ..P WKT 2010 07 13 00 14 25 31.3200 -97.3300 251.000 457.0 97.099 3.640 -999.990 -999.990 0.971 ..P WKT 2010 07 13 00 14 55 31.3200 -97.3300 251.000 457.0 94.212 3.680 -999.990 -999.990 0.942 ..P WKT 2010 07 13 00 19 55 31.3200 -97.3300 251.000 30.0 96.260 3.380 -999.990 -999.990 0.963 ..P WKT 2010 07 13 00 24 55 31.3200 -97.3300 251.000 122.0 107.859 3.850 -999.990 -999.990 1.079 ..P WKT 2010 07 13 00 29 55 31.3200 -97.3300 251.000 457.0 98.247 3.580 -999.990 -999.990 0.982 ..P WKT 2010 07 13 00 34 55 31.3200 -97.3300 251.000 30.0 104.225 3.930 -999.990 -999.990 1.042 ..P WKT 2010 07 13 00 39 55 31.3200 -97.3300 251.000 122.0 105.988 4.310 -999.990 -999.990 1.060 ..P WKT 2010 07 13 00 44 55 31.3200 -97.3300 251.000 457.0 101.997 4.480 -999.990 -999.990 1.020 ..P WKT 2010 07 13 00 54 55 31.3200 -97.3300 251.000 30.0 97.112 4.080 -999.990 -999.990 0.971 ..P WKT 2010 07 13 00 59 55 31.3200 -97.3300 251.000 122.0 102.109 4.420 -999.990 -999.990 1.021 ..P WKT 2010 07 13 01 04 55 31.3200 -97.3300 251.000 457.0 95.042 4.150 -999.990 -999.990 0.950 ..P WKT 2010 07 13 01 09 55 31.3200 -97.3300 251.000 30.0 103.542 3.850 -999.990 -999.990 1.035 ..P WKT 2010 07 13 01 14 55 31.3200 -97.3300 251.000 122.0 104.329 4.030 -999.990 -999.990 1.043 ..P WKT 2010 07 13 01 19 55 31.3200 -97.3300 251.000 457.0 92.782 3.700 -999.990 -999.990 0.928 ..P WKT 2010 07 13 01 29 55 31.3200 -97.3300 251.000 30.0 99.762 2.950 -999.990 -999.990 0.998 ..P WKT 2010 07 13 01 34 55 31.3200 -97.3300 251.000 122.0 105.111 3.970 -999.990 -999.990 1.051 ..P WKT 2010 07 13 01 39 55 31.3200 -97.3300 251.000 457.0 92.534 4.760 -999.990 -999.990 0.925 ..P WKT 2010 07 13 01 44 55 31.3200 -97.3300 251.000 30.0 100.122 3.060 -999.990 -999.990 1.001 ..P WKT 2010 07 13 01 49 55 31.3200 -97.3300 251.000 122.0 102.388 2.750 -999.990 -999.990 1.024 ..P WKT 2010 07 13 01 54 55 31.3200 -97.3300 251.000 457.0 92.898 4.870 -999.990 -999.990 0.929 ..P WKT 2010 07 13 02 04 55 31.3200 -97.3300 251.000 30.0 100.428 2.690 -999.990 -999.990 1.004 ..P WKT 2010 07 13 02 09 55 31.3200 -97.3300 251.000 122.0 97.297 2.580 -999.990 -999.990 0.973 ..P WKT 2010 07 13 02 14 55 31.3200 -97.3300 251.000 457.0 92.770 3.250 -999.990 -999.990 0.928 ..P WKT 2010 07 13 02 19 55 31.3200 -97.3300 251.000 30.0 103.062 2.970 -999.990 -999.990 1.031 ..P WKT 2010 07 13 02 24 55 31.3200 -97.3300 251.000 122.0 103.846 4.110 -999.990 -999.990 1.038 ..P WKT 2010 07 13 02 29 55 31.3200 -97.3300 251.000 457.0 89.818 2.830 -999.990 -999.990 0.898 ..P WKT 2010 07 13 02 39 55 31.3200 -97.3300 251.000 30.0 95.502 3.010 -999.990 -999.990 0.955 ..P WKT 2010 07 13 02 44 55 31.3200 -97.3300 251.000 122.0 94.811 4.800 -999.990 -999.990 0.948 ..P WKT 2010 07 13 02 49 55 31.3200 -97.3300 251.000 457.0 92.724 3.560 -999.990 -999.990 0.927 ..P WKT 2010 07 13 02 54 55 31.3200 -97.3300 251.000 30.0 97.339 4.780 -999.990 -999.990 0.973 ..P WKT 2010 07 13 02 59 55 31.3200 -97.3300 251.000 122.0 96.369 4.550 -999.990 -999.990 0.964 ..P WKT 2010 07 13 03 04 55 31.3200 -97.3300 251.000 457.0 89.261 4.940 -999.990 -999.990 0.893 ..P WKT 2010 07 13 03 14 55 31.3200 -97.3300 251.000 30.0 93.044 5.050 -999.990 -999.990 0.930 ..P WKT 2010 07 13 03 19 55 31.3200 -97.3300 251.000 122.0 100.999 4.780 -999.990 -999.990 1.010 ..P WKT 2010 07 13 03 24 55 31.3200 -97.3300 251.000 457.0 88.598 4.500 -999.990 -999.990 0.886 ..P WKT 2010 07 13 03 29 55 31.3200 -97.3300 251.000 30.0 97.387 4.310 -999.990 -999.990 0.974 ..P WKT 2010 07 13 03 34 55 31.3200 -97.3300 251.000 122.0 103.944 3.810 -999.990 -999.990 1.039 ..P WKT 2010 07 13 03 39 55 31.3200 -97.3300 251.000 457.0 93.640 3.700 -999.990 -999.990 0.936 ..P WKT 2010 07 13 03 49 55 31.3200 -97.3300 251.000 30.0 97.077 3.690 -999.990 -999.990 0.971 ..P WKT 2010 07 13 03 54 55 31.3200 -97.3300 251.000 122.0 93.961 3.690 -999.990 -999.990 0.940 ..P WKT 2010 07 13 03 59 55 31.3200 -97.3300 251.000 457.0 88.341 4.100 -999.990 -999.990 0.883 ..P WKT 2010 07 13 04 04 55 31.3200 -97.3300 251.000 30.0 91.630 3.710 -999.990 -999.990 0.916 ..P WKT 2010 07 13 04 09 55 31.3200 -97.3300 251.000 122.0 90.465 3.440 -999.990 -999.990 0.905 ..P WKT 2010 07 13 04 14 55 31.3200 -97.3300 251.000 457.0 92.918 4.580 -999.990 -999.990 0.929 ..P WKT 2010 07 13 04 24 55 31.3200 -97.3300 251.000 30.0 91.165 3.120 -999.990 -999.990 0.912 ..P WKT 2010 07 13 04 29 55 31.3200 -97.3300 251.000 122.0 87.797 3.350 -999.990 -999.990 0.878 ..P WKT 2010 07 13 04 34 55 31.3200 -97.3300 251.000 457.0 89.156 3.720 -999.990 -999.990 0.892 ..P WKT 2010 07 13 04 39 55 31.3200 -97.3300 251.000 30.0 90.515 4.630 -999.990 -999.990 0.905 ..P WKT 2010 07 13 04 44 55 31.3200 -97.3300 251.000 122.0 90.484 4.220 -999.990 -999.990 0.905 ..P WKT 2010 07 13 04 49 55 31.3200 -97.3300 251.000 457.0 88.230 5.180 -999.990 -999.990 0.882 ..P WKT 2010 07 13 05 04 55 31.3200 -97.3300 251.000 30.0 87.413 6.370 -999.990 -999.990 0.874 ..P WKT 2010 07 13 05 09 55 31.3200 -97.3300 251.000 122.0 90.838 4.170 -999.990 -999.990 0.908 ..P WKT 2010 07 13 05 14 55 31.3200 -97.3300 251.000 457.0 83.991 3.160 -999.990 -999.990 0.840 ..P WKT 2010 07 13 05 19 55 31.3200 -97.3300 251.000 30.0 82.698 3.520 -999.990 -999.990 0.827 ..P WKT 2010 07 13 05 24 55 31.3200 -97.3300 251.000 122.0 87.509 3.310 -999.990 -999.990 0.875 ..P WKT 2010 07 13 05 29 55 31.3200 -97.3300 251.000 457.0 88.157 3.630 -999.990 -999.990 0.882 ..P WKT 2010 07 13 05 39 55 31.3200 -97.3300 251.000 30.0 87.961 3.360 -999.990 -999.990 0.880 ..P WKT 2010 07 13 05 44 55 31.3200 -97.3300 251.000 122.0 87.673 3.630 -999.990 -999.990 0.877 ..P WKT 2010 07 13 05 49 55 31.3200 -97.3300 251.000 457.0 86.276 4.260 -999.990 -999.990 0.863 ..P WKT 2010 07 13 05 54 55 31.3200 -97.3300 251.000 30.0 85.989 3.380 -999.990 -999.990 0.860 ..P WKT 2010 07 13 05 59 55 31.3200 -97.3300 251.000 122.0 88.194 3.180 -999.990 -999.990 0.882 ..P WKT 2010 07 13 06 04 55 31.3200 -97.3300 251.000 457.0 86.799 3.030 -999.990 -999.990 0.868 ..P WKT 2010 07 13 06 14 55 31.3200 -97.3300 251.000 30.0 84.681 3.840 -999.990 -999.990 0.847 ..P WKT 2010 07 13 06 19 55 31.3200 -97.3300 251.000 122.0 87.834 4.090 -999.990 -999.990 0.878 ..P WKT 2010 07 13 06 24 55 31.3200 -97.3300 251.000 457.0 88.495 3.700 -999.990 -999.990 0.885 ..P WKT 2010 07 13 06 29 55 31.3200 -97.3300 251.000 30.0 83.900 4.520 -999.990 -999.990 0.839 ..P WKT 2010 07 13 06 34 55 31.3200 -97.3300 251.000 122.0 85.668 4.940 -999.990 -999.990 0.857 ..P WKT 2010 07 13 06 39 55 31.3200 -97.3300 251.000 457.0 94.073 3.390 -999.990 -999.990 0.941 ..P WKT 2010 07 13 06 49 55 31.3200 -97.3300 251.000 30.0 82.773 2.810 -999.990 -999.990 0.828 ..P WKT 2010 07 13 06 54 55 31.3200 -97.3300 251.000 122.0 88.784 3.950 -999.990 -999.990 0.888 ..P WKT 2010 07 13 06 59 55 31.3200 -97.3300 251.000 457.0 92.030 4.420 -999.990 -999.990 0.920 ..P WKT 2010 07 13 07 04 55 31.3200 -97.3300 251.000 30.0 93.616 3.710 -999.990 -999.990 0.936 ..P WKT 2010 07 13 07 09 55 31.3200 -97.3300 251.000 122.0 98.517 3.460 -999.990 -999.990 0.985 ..P WKT 2010 07 13 07 14 55 31.3200 -97.3300 251.000 457.0 94.993 2.600 -999.990 -999.990 0.950 ..P WKT 2010 07 13 07 24 55 31.3200 -97.3300 251.000 30.0 95.166 2.740 -999.990 -999.990 0.952 ..P WKT 2010 07 13 07 29 55 31.3200 -97.3300 251.000 122.0 97.617 4.820 -999.990 -999.990 0.976 ..P WKT 2010 07 13 07 34 55 31.3200 -97.3300 251.000 457.0 101.034 3.860 -999.990 -999.990 1.010 ..P WKT 2010 07 13 07 39 55 31.3200 -97.3300 251.000 30.0 97.000 3.500 -999.990 -999.990 0.970 ..P WKT 2010 07 13 07 44 55 31.3200 -97.3300 251.000 122.0 101.105 3.070 -999.990 -999.990 1.011 ..P WKT 2010 07 13 07 49 55 31.3200 -97.3300 251.000 457.0 96.522 2.620 -999.990 -999.990 0.965 ..P WKT 2010 07 13 07 59 55 31.3200 -97.3300 251.000 30.0 90.255 2.660 -999.990 -999.990 0.903 ..P WKT 2010 07 13 08 04 55 31.3200 -97.3300 251.000 122.0 96.563 3.760 -999.990 -999.990 0.966 ..P WKT 2010 07 13 08 09 55 31.3200 -97.3300 251.000 457.0 97.770 3.480 -999.990 -999.990 0.978 ..P WKT 2010 07 13 08 14 55 31.3200 -97.3300 251.000 30.0 91.953 3.000 -999.990 -999.990 0.920 ..P WKT 2010 07 13 08 19 55 31.3200 -97.3300 251.000 122.0 91.922 3.340 -999.990 -999.990 0.919 ..P WKT 2010 07 13 08 24 55 31.3200 -97.3300 251.000 457.0 92.303 3.680 -999.990 -999.990 0.923 ..P WKT 2010 07 13 08 34 55 31.3200 -97.3300 251.000 30.0 89.036 3.690 -999.990 -999.990 0.890 ..P WKT 2010 07 13 08 39 55 31.3200 -97.3300 251.000 122.0 92.680 3.690 -999.990 -999.990 0.927 ..P WKT 2010 07 13 08 44 55 31.3200 -97.3300 251.000 457.0 92.060 3.680 -999.990 -999.990 0.921 ..P WKT 2010 07 13 08 49 55 31.3200 -97.3300 251.000 30.0 86.763 4.700 -999.990 -999.990 0.868 ..P WKT 2010 07 13 08 54 55 31.3200 -97.3300 251.000 122.0 90.818 3.810 -999.990 -999.990 0.908 ..P WKT 2010 07 13 08 59 55 31.3200 -97.3300 251.000 457.0 89.373 4.090 -999.990 -999.990 0.894 ..P WKT 2010 07 13 09 09 55 31.3200 -97.3300 251.000 30.0 95.594 4.010 -999.990 -999.990 0.956 ..P WKT 2010 07 13 09 14 55 31.3200 -97.3300 251.000 122.0 87.867 3.850 -999.990 -999.990 0.879 ..P WKT 2010 07 13 09 19 55 31.3200 -97.3300 251.000 457.0 90.585 3.530 -999.990 -999.990 0.906 ..P WKT 2010 07 13 09 24 55 31.3200 -97.3300 251.000 30.0 92.476 3.010 -999.990 -999.990 0.925 ..P WKT 2010 07 13 09 29 55 31.3200 -97.3300 251.000 122.0 92.994 2.960 -999.990 -999.990 0.930 ..P WKT 2010 07 13 09 34 55 31.3200 -97.3300 251.000 457.0 95.708 3.310 -999.990 -999.990 0.957 ..P WKT 2010 07 13 09 44 55 31.3200 -97.3300 251.000 30.0 92.801 2.980 -999.990 -999.990 0.928 ..P WKT 2010 07 13 09 49 55 31.3200 -97.3300 251.000 122.0 93.770 2.440 -999.990 -999.990 0.938 ..P WKT 2010 07 13 09 54 55 31.3200 -97.3300 251.000 457.0 92.268 2.630 -999.990 -999.990 0.923 ..P WKT 2010 07 13 09 59 55 31.3200 -97.3300 251.000 30.0 94.608 2.900 -999.990 -999.990 0.946 ..P WKT 2010 07 13 10 04 55 31.3200 -97.3300 251.000 122.0 101.882 3.740 -999.990 -999.990 1.019 ..P WKT 2010 07 13 10 09 55 31.3200 -97.3300 251.000 457.0 89.962 2.410 -999.990 -999.990 0.900 ..P WKT 2010 07 13 10 19 55 31.3200 -97.3300 251.000 30.0 90.526 2.460 -999.990 -999.990 0.905 ..P WKT 2010 07 13 10 24 55 31.3200 -97.3300 251.000 122.0 93.960 2.270 -999.990 -999.990 0.940 ..P WKT 2010 07 13 10 29 55 31.3200 -97.3300 251.000 457.0 96.021 3.260 -999.990 -999.990 0.960 ..P WKT 2010 07 13 10 34 55 31.3200 -97.3300 251.000 30.0 88.771 3.180 -999.990 -999.990 0.888 ..P WKT 2010 07 13 10 39 55 31.3200 -97.3300 251.000 122.0 94.119 2.590 -999.990 -999.990 0.941 ..P WKT 2010 07 13 10 44 55 31.3200 -97.3300 251.000 457.0 93.989 3.630 -999.990 -999.990 0.940 ..P WKT 2010 07 13 10 54 55 31.3200 -97.3300 251.000 30.0 91.170 3.160 -999.990 -999.990 0.912 ..P WKT 2010 07 13 10 59 55 31.3200 -97.3300 251.000 122.0 92.859 2.980 -999.990 -999.990 0.929 ..P WKT 2010 07 13 11 04 55 31.3200 -97.3300 251.000 457.0 91.812 3.540 -999.990 -999.990 0.918 ..P WKT 2010 07 13 11 09 55 31.3200 -97.3300 251.000 30.0 92.132 3.760 -999.990 -999.990 0.921 ..P WKT 2010 07 13 11 14 55 31.3200 -97.3300 251.000 122.0 94.776 2.590 -999.990 -999.990 0.948 ..P WKT 2010 07 13 11 19 55 31.3200 -97.3300 251.000 457.0 91.543 2.760 -999.990 -999.990 0.915 ..P WKT 2010 07 13 11 29 55 31.3200 -97.3300 251.000 30.0 90.638 3.040 -999.990 -999.990 0.906 ..P WKT 2010 07 13 11 34 55 31.3200 -97.3300 251.000 122.0 100.616 2.880 -999.990 -999.990 1.006 ..P WKT 2010 07 13 11 39 55 31.3200 -97.3300 251.000 457.0 94.064 3.550 -999.990 -999.990 0.941 ..P WKT 2010 07 13 11 44 55 31.3200 -97.3300 251.000 30.0 93.523 2.540 -999.990 -999.990 0.935 ..P WKT 2010 07 13 11 49 55 31.3200 -97.3300 251.000 122.0 101.583 3.330 -999.990 -999.990 1.016 ..P WKT 2010 07 13 12 09 55 31.3200 -97.3300 251.000 457.0 95.714 3.390 -999.990 -999.990 0.957 ..P WKT 2010 07 13 12 10 25 31.3200 -97.3300 251.000 457.0 93.743 3.640 -999.990 -999.990 0.937 ..P WKT 2010 07 13 12 10 55 31.3200 -97.3300 251.000 457.0 93.000 4.070 -999.990 -999.990 0.930 ..P WKT 2010 07 13 12 11 25 31.3200 -97.3300 251.000 457.0 87.344 3.210 -999.990 -999.990 0.873 ..P WKT 2010 07 13 12 11 55 31.3200 -97.3300 251.000 457.0 90.286 2.690 -999.990 -999.990 0.903 ..P WKT 2010 07 13 12 12 25 31.3200 -97.3300 251.000 457.0 91.591 2.630 -999.990 -999.990 0.916 ..P WKT 2010 07 13 12 12 55 31.3200 -97.3300 251.000 457.0 92.350 3.930 -999.990 -999.990 0.923 ..P WKT 2010 07 13 12 13 25 31.3200 -97.3300 251.000 457.0 96.658 3.790 -999.990 -999.990 0.967 ..P WKT 2010 07 13 12 13 55 31.3200 -97.3300 251.000 457.0 90.591 2.510 -999.990 -999.990 0.906 ..P WKT 2010 07 13 12 14 25 31.3200 -97.3300 251.000 457.0 90.258 2.540 -999.990 -999.990 0.903 ..P WKT 2010 07 13 12 14 55 31.3200 -97.3300 251.000 457.0 90.061 2.740 -999.990 -999.990 0.901 ..P WKT 2010 07 13 12 19 55 31.3200 -97.3300 251.000 30.0 92.188 2.740 -999.990 -999.990 0.922 ..P WKT 2010 07 13 12 24 55 31.3200 -97.3300 251.000 122.0 101.828 3.450 -999.990 -999.990 1.018 ..P WKT 2010 07 13 12 29 55 31.3200 -97.3300 251.000 457.0 88.661 3.310 -999.990 -999.990 0.887 ..P WKT 2010 07 13 12 34 55 31.3200 -97.3300 251.000 30.0 95.297 4.230 -999.990 -999.990 0.953 ..P WKT 2010 07 13 12 39 55 31.3200 -97.3300 251.000 122.0 96.744 3.420 -999.990 -999.990 0.967 ..P WKT 2010 07 13 12 44 55 31.3200 -97.3300 251.000 457.0 84.117 3.160 -999.990 -999.990 0.841 ..P WKT 2010 07 13 12 54 55 31.3200 -97.3300 251.000 30.0 94.466 3.310 -999.990 -999.990 0.945 ..P WKT 2010 07 13 12 59 55 31.3200 -97.3300 251.000 122.0 97.356 3.040 -999.990 -999.990 0.974 ..P WKT 2010 07 13 13 04 55 31.3200 -97.3300 251.000 457.0 90.130 3.580 -999.990 -999.990 0.901 ..P WKT 2010 07 13 13 09 55 31.3200 -97.3300 251.000 30.0 93.020 3.170 -999.990 -999.990 0.930 ..P WKT 2010 07 13 13 14 55 31.3200 -97.3300 251.000 122.0 105.487 3.070 -999.990 -999.990 1.055 ..P WKT 2010 07 13 13 19 55 31.3200 -97.3300 251.000 457.0 93.880 3.180 -999.990 -999.990 0.939 ..P WKT 2010 07 13 13 29 55 31.3200 -97.3300 251.000 30.0 102.384 3.520 -999.990 -999.990 1.024 ..P WKT 2010 07 13 13 34 55 31.3200 -97.3300 251.000 122.0 108.271 4.210 -999.990 -999.990 1.083 ..P WKT 2010 07 13 13 39 55 31.3200 -97.3300 251.000 457.0 98.006 5.150 -999.990 -999.990 0.980 ..P WKT 2010 07 13 13 44 55 31.3200 -97.3300 251.000 30.0 110.467 4.380 -999.990 -999.990 1.105 ..P WKT 2010 07 13 13 49 55 31.3200 -97.3300 251.000 122.0 104.307 4.790 -999.990 -999.990 1.043 ..P WKT 2010 07 13 13 54 55 31.3200 -97.3300 251.000 457.0 99.241 5.490 -999.990 -999.990 0.992 ..P WKT 2010 07 13 14 04 55 31.3200 -97.3300 251.000 30.0 102.179 5.510 -999.990 -999.990 1.022 ..P WKT 2010 07 13 14 09 55 31.3200 -97.3300 251.000 122.0 104.980 5.400 -999.990 -999.990 1.050 ..P WKT 2010 07 13 14 14 55 31.3200 -97.3300 251.000 457.0 98.188 5.460 -999.990 -999.990 0.982 ..P WKT 2010 07 13 14 19 55 31.3200 -97.3300 251.000 30.0 96.055 5.590 -999.990 -999.990 0.961 ..P WKT 2010 07 13 14 24 55 31.3200 -97.3300 251.000 122.0 103.790 4.640 -999.990 -999.990 1.038 ..P WKT 2010 07 13 14 29 55 31.3200 -97.3300 251.000 457.0 93.430 5.300 -999.990 -999.990 0.934 ..P WKT 2010 07 13 14 39 55 31.3200 -97.3300 251.000 30.0 100.321 4.630 -999.990 -999.990 1.003 ..P WKT 2010 07 13 14 44 55 31.3200 -97.3300 251.000 122.0 103.040 3.890 -999.990 -999.990 1.030 ..P WKT 2010 07 13 14 49 55 31.3200 -97.3300 251.000 457.0 93.959 4.180 -999.990 -999.990 0.940 ..P WKT 2010 07 13 14 54 55 31.3200 -97.3300 251.000 30.0 94.483 4.120 -999.990 -999.990 0.945 ..P WKT 2010 07 13 14 59 55 31.3200 -97.3300 251.000 122.0 99.122 3.520 -999.990 -999.990 0.991 ..P WKT 2010 07 13 16 04 55 31.3200 -97.3300 251.000 30.0 98.657 1.950 -999.990 -999.990 0.987 ..P WKT 2010 07 13 16 09 55 31.3200 -97.3300 251.000 122.0 106.059 1.790 -999.990 -999.990 1.061 ..P WKT 2010 07 13 16 14 55 31.3200 -97.3300 251.000 457.0 95.717 6.000 -999.990 -999.990 0.957 ..P WKT 2010 07 13 16 24 55 31.3200 -97.3300 251.000 30.0 99.840 1.790 -999.990 -999.990 0.998 ..P WKT 2010 07 13 16 29 55 31.3200 -97.3300 251.000 122.0 112.249 2.400 -999.990 -999.990 1.122 ..P WKT 2010 07 13 16 34 55 31.3200 -97.3300 251.000 457.0 104.837 2.530 -999.990 -999.990 1.048 ..P WKT 2010 07 13 16 39 55 31.3200 -97.3300 251.000 30.0 109.127 3.160 -999.990 -999.990 1.091 ..P WKT 2010 07 13 16 44 55 31.3200 -97.3300 251.000 122.0 109.700 3.310 -999.990 -999.990 1.097 ..P WKT 2010 07 13 16 49 55 31.3200 -97.3300 251.000 457.0 103.937 3.460 -999.990 -999.990 1.039 ..P WKT 2010 07 13 17 04 55 31.3200 -97.3300 251.000 30.0 108.101 3.460 -999.990 -999.990 1.081 ..P WKT 2010 07 13 17 09 55 31.3200 -97.3300 251.000 122.0 113.413 4.330 -999.990 -999.990 1.134 ..P WKT 2010 07 13 17 14 55 31.3200 -97.3300 251.000 457.0 112.660 3.680 -999.990 -999.990 1.127 ..P WKT 2010 07 13 17 19 55 31.3200 -97.3300 251.000 30.0 113.010 5.690 -999.990 -999.990 1.130 ..P WKT 2010 07 13 17 24 55 31.3200 -97.3300 251.000 122.0 113.637 3.880 -999.990 -999.990 1.136 ..P WKT 2010 07 13 17 29 55 31.3200 -97.3300 251.000 457.0 114.263 3.680 -999.990 -999.990 1.143 ..P WKT 2010 07 13 17 39 55 31.3200 -97.3300 251.000 30.0 118.066 3.470 -999.990 -999.990 1.181 ..P WKT 2010 07 13 17 44 55 31.3200 -97.3300 251.000 122.0 115.448 3.270 -999.990 -999.990 1.154 ..P WKT 2010 07 13 17 49 55 31.3200 -97.3300 251.000 457.0 114.762 2.950 -999.990 -999.990 1.148 ..P WKT 2010 07 13 17 54 55 31.3200 -97.3300 251.000 30.0 116.284 3.620 -999.990 -999.990 1.163 ..P WKT 2010 07 13 17 59 55 31.3200 -97.3300 251.000 122.0 116.150 4.240 -999.990 -999.990 1.161 ..P WKT 2010 07 13 18 04 55 31.3200 -97.3300 251.000 457.0 104.969 2.540 -999.990 -999.990 1.050 ..P WKT 2010 07 13 18 14 55 31.3200 -97.3300 251.000 30.0 111.405 2.130 -999.990 -999.990 1.114 ..P WKT 2010 07 13 18 19 55 31.3200 -97.3300 251.000 122.0 114.388 2.480 -999.990 -999.990 1.144 ..P WKT 2010 07 13 18 24 55 31.3200 -97.3300 251.000 457.0 105.213 3.000 -999.990 -999.990 1.052 ..P WKT 2010 07 13 18 29 55 31.3200 -97.3300 251.000 30.0 108.473 3.050 -999.990 -999.990 1.085 ..P WKT 2010 07 13 18 34 55 31.3200 -97.3300 251.000 122.0 116.432 2.800 -999.990 -999.990 1.164 ..P WKT 2010 07 13 18 39 55 31.3200 -97.3300 251.000 457.0 104.765 2.840 -999.990 -999.990 1.048 ..P WKT 2010 07 13 18 49 55 31.3200 -97.3300 251.000 30.0 102.339 3.360 -999.990 -999.990 1.023 ..P WKT 2010 07 13 18 54 55 31.3200 -97.3300 251.000 122.0 109.097 2.940 -999.990 -999.990 1.091 ..P WKT 2010 07 13 18 59 55 31.3200 -97.3300 251.000 457.0 99.951 2.030 -999.990 -999.990 1.000 ..P WKT 2010 07 13 19 04 55 31.3200 -97.3300 251.000 30.0 100.209 2.840 -999.990 -999.990 1.002 ..P WKT 2010 07 13 19 09 55 31.3200 -97.3300 251.000 122.0 104.064 2.770 -999.990 -999.990 1.041 ..P WKT 2010 07 13 19 14 55 31.3200 -97.3300 251.000 457.0 91.591 1.930 -999.990 -999.990 0.916 ..P WKT 2010 07 13 19 24 55 31.3200 -97.3300 251.000 30.0 94.952 2.360 -999.990 -999.990 0.950 ..P WKT 2010 07 13 19 29 55 31.3200 -97.3300 251.000 122.0 101.520 4.740 -999.990 -999.990 1.015 ..P WKT 2010 07 13 19 34 55 31.3200 -97.3300 251.000 457.0 92.856 2.340 -999.990 -999.990 0.929 ..P WKT 2010 07 13 19 39 55 31.3200 -97.3300 251.000 30.0 105.657 3.110 -999.990 -999.990 1.057 ..P WKT 2010 07 13 19 44 55 31.3200 -97.3300 251.000 122.0 106.965 3.350 -999.990 -999.990 1.070 ..P WKT 2010 07 13 19 49 55 31.3200 -97.3300 251.000 457.0 104.394 1.970 -999.990 -999.990 1.044 ..P WKT 2010 07 13 19 59 55 31.3200 -97.3300 251.000 30.0 101.111 2.140 -999.990 -999.990 1.011 ..P WKT 2010 07 13 20 04 55 31.3200 -97.3300 251.000 122.0 108.439 2.660 -999.990 -999.990 1.084 ..P WKT 2010 07 13 20 09 55 31.3200 -97.3300 251.000 457.0 101.074 5.250 -999.990 -999.990 1.011 ..P WKT 2010 07 13 20 14 55 31.3200 -97.3300 251.000 30.0 95.371 4.440 -999.990 -999.990 0.954 ..P WKT 2010 07 13 20 19 55 31.3200 -97.3300 251.000 122.0 100.205 4.140 -999.990 -999.990 1.002 ..P WKT 2010 07 13 20 24 55 31.3200 -97.3300 251.000 457.0 90.893 3.510 -999.990 -999.990 0.909 ..P WKT 2010 07 13 20 34 55 31.3200 -97.3300 251.000 30.0 96.462 4.130 -999.990 -999.990 0.965 ..P WKT 2010 07 13 20 39 55 31.3200 -97.3300 251.000 122.0 105.106 4.220 -999.990 -999.990 1.051 ..P WKT 2010 07 13 20 44 55 31.3200 -97.3300 251.000 457.0 90.852 4.430 -999.990 -999.990 0.909 ..P WKT 2010 07 13 20 49 55 31.3200 -97.3300 251.000 30.0 101.302 3.840 -999.990 -999.990 1.013 ..P WKT 2010 07 13 20 54 55 31.3200 -97.3300 251.000 122.0 108.008 3.310 -999.990 -999.990 1.080 ..P WKT 2010 07 13 20 59 55 31.3200 -97.3300 251.000 457.0 94.441 3.420 -999.990 -999.990 0.944 ..P WKT 2010 07 13 21 09 55 31.3200 -97.3300 251.000 30.0 101.963 2.820 -999.990 -999.990 1.020 ..P WKT 2010 07 13 21 14 55 31.3200 -97.3300 251.000 122.0 100.555 3.460 -999.990 -999.990 1.006 ..P WKT 2010 07 13 21 19 55 31.3200 -97.3300 251.000 457.0 93.032 3.260 -999.990 -999.990 0.930 ..P WKT 2010 07 13 21 24 55 31.3200 -97.3300 251.000 30.0 94.402 2.610 -999.990 -999.990 0.944 ..P WKT 2010 07 13 21 29 55 31.3200 -97.3300 251.000 122.0 103.279 2.100 -999.990 -999.990 1.033 ..P WKT 2010 07 13 21 34 55 31.3200 -97.3300 251.000 457.0 97.977 1.990 -999.990 -999.990 0.980 ..P WKT 2010 07 13 21 44 55 31.3200 -97.3300 251.000 30.0 98.972 1.750 -999.990 -999.990 0.990 ..P WKT 2010 07 13 21 49 55 31.3200 -97.3300 251.000 122.0 103.047 1.590 -999.990 -999.990 1.030 ..P WKT 2010 07 13 21 54 55 31.3200 -97.3300 251.000 457.0 97.941 1.790 -999.990 -999.990 0.979 ..P WKT 2010 07 13 21 59 55 31.3200 -97.3300 251.000 30.0 93.667 1.440 -999.990 -999.990 0.937 ..P WKT 2010 07 13 22 04 55 31.3200 -97.3300 251.000 122.0 103.031 1.790 -999.990 -999.990 1.030 ..P WKT 2010 07 13 22 09 55 31.3200 -97.3300 251.000 457.0 94.860 1.460 -999.990 -999.990 0.949 ..P WKT 2010 07 13 22 19 55 31.3200 -97.3300 251.000 30.0 93.548 2.500 -999.990 -999.990 0.935 ..P WKT 2010 07 13 22 24 55 31.3200 -97.3300 251.000 122.0 101.247 2.280 -999.990 -999.990 1.012 ..P WKT 2010 07 13 22 29 55 31.3200 -97.3300 251.000 457.0 93.349 1.930 -999.990 -999.990 0.933 ..P WKT 2010 07 13 22 34 55 31.3200 -97.3300 251.000 30.0 90.742 2.440 -999.990 -999.990 0.907 ..P WKT 2010 07 13 22 39 55 31.3200 -97.3300 251.000 122.0 105.410 1.410 -999.990 -999.990 1.054 ..P WKT 2010 07 13 22 44 55 31.3200 -97.3300 251.000 457.0 104.198 1.770 -999.990 -999.990 1.042 ..P WKT 2010 07 13 22 54 55 31.3200 -97.3300 251.000 30.0 96.714 1.540 -999.990 -999.990 0.967 ..P WKT 2010 07 13 22 59 55 31.3200 -97.3300 251.000 122.0 97.970 1.980 -999.990 -999.990 0.980 ..P WKT 2010 07 13 23 04 55 31.3200 -97.3300 251.000 457.0 101.596 1.770 -999.990 -999.990 1.016 ..P WKT 2010 07 13 23 09 55 31.3200 -97.3300 251.000 30.0 97.692 4.460 -999.990 -999.990 0.977 ..P WKT 2010 07 13 23 14 55 31.3200 -97.3300 251.000 122.0 102.297 2.770 -999.990 -999.990 1.023 ..P WKT 2010 07 13 23 19 55 31.3200 -97.3300 251.000 457.0 91.277 2.500 -999.990 -999.990 0.913 ..P WKT 2010 07 13 23 29 55 31.3200 -97.3300 251.000 30.0 101.605 2.660 -999.990 -999.990 1.016 ..P WKT 2010 07 13 23 34 55 31.3200 -97.3300 251.000 122.0 109.426 3.880 -999.990 -999.990 1.094 ..P WKT 2010 07 13 23 39 55 31.3200 -97.3300 251.000 457.0 105.662 2.740 -999.990 -999.990 1.057 ..P WKT 2010 07 13 23 44 55 31.3200 -97.3300 251.000 30.0 101.896 2.270 -999.990 -999.990 1.019 ..P WKT 2010 07 13 23 49 55 31.3200 -97.3300 251.000 122.0 100.644 2.320 -999.990 -999.990 1.006 ..P WKT 2010 07 14 00 09 55 31.3200 -97.3300 251.000 457.0 94.950 4.380 -999.990 -999.990 0.950 ..P WKT 2010 07 14 00 10 25 31.3200 -97.3300 251.000 457.0 92.440 3.230 -999.990 -999.990 0.924 ..P WKT 2010 07 14 00 10 55 31.3200 -97.3300 251.000 457.0 94.679 2.950 -999.990 -999.990 0.947 ..P WKT 2010 07 14 00 11 25 31.3200 -97.3300 251.000 457.0 90.632 1.850 -999.990 -999.990 0.906 ..P WKT 2010 07 14 00 11 55 31.3200 -97.3300 251.000 457.0 95.804 2.310 -999.990 -999.990 0.958 ..P WKT 2010 07 14 00 12 25 31.3200 -97.3300 251.000 457.0 93.992 2.370 -999.990 -999.990 0.940 ..P WKT 2010 07 14 00 12 55 31.3200 -97.3300 251.000 457.0 97.208 1.690 -999.990 -999.990 0.972 ..P WKT 2010 07 14 00 13 25 31.3200 -97.3300 251.000 457.0 96.933 1.860 -999.990 -999.990 0.969 ..P WKT 2010 07 14 00 13 55 31.3200 -97.3300 251.000 457.0 95.121 2.180 -999.990 -999.990 0.951 ..P WKT 2010 07 14 00 14 25 31.3200 -97.3300 251.000 457.0 98.477 2.240 -999.990 -999.990 0.985 ..P WKT 2010 07 14 00 14 55 31.3200 -97.3300 251.000 457.0 99.039 2.010 -999.990 -999.990 0.990 ..P WKT 2010 07 14 00 19 55 31.3200 -97.3300 251.000 30.0 93.491 1.990 -999.990 -999.990 0.935 ..P WKT 2010 07 14 00 24 55 31.3200 -97.3300 251.000 122.0 100.651 1.870 -999.990 -999.990 1.007 ..P WKT 2010 07 14 00 29 55 31.3200 -97.3300 251.000 457.0 96.360 1.830 -999.990 -999.990 0.964 ..P WKT 2010 07 14 00 34 55 31.3200 -97.3300 251.000 30.0 90.952 2.920 -999.990 -999.990 0.910 ..P WKT 2010 07 14 00 39 55 31.3200 -97.3300 251.000 122.0 102.441 2.130 -999.990 -999.990 1.024 ..P WKT 2010 07 14 00 44 55 31.3200 -97.3300 251.000 457.0 89.773 2.270 -999.990 -999.990 0.898 ..P WKT 2010 07 14 00 54 55 31.3200 -97.3300 251.000 30.0 92.491 4.400 -999.990 -999.990 0.925 ..P WKT 2010 07 14 00 59 55 31.3200 -97.3300 251.000 122.0 95.730 2.850 -999.990 -999.990 0.957 ..P WKT 2010 07 14 01 04 55 31.3200 -97.3300 251.000 457.0 87.381 1.990 -999.990 -999.990 0.874 ..P WKT 2010 07 14 01 09 55 31.3200 -97.3300 251.000 30.0 91.876 2.430 -999.990 -999.990 0.919 ..P WKT 2010 07 14 01 14 55 31.3200 -97.3300 251.000 122.0 91.065 3.410 -999.990 -999.990 0.911 ..P WKT 2010 07 14 01 19 55 31.3200 -97.3300 251.000 457.0 89.976 1.770 -999.990 -999.990 0.900 ..P WKT 2010 07 14 01 29 55 31.3200 -97.3300 251.000 30.0 91.885 1.760 -999.990 -999.990 0.919 ..P WKT 2010 07 14 01 34 55 31.3200 -97.3300 251.000 122.0 96.279 2.010 -999.990 -999.990 0.963 ..P WKT 2010 07 14 01 39 55 31.3200 -97.3300 251.000 457.0 95.090 3.610 -999.990 -999.990 0.951 ..P WKT 2010 07 14 01 44 55 31.3200 -97.3300 251.000 30.0 98.924 2.340 -999.990 -999.990 0.989 ..P WKT 2010 07 14 01 49 55 31.3200 -97.3300 251.000 122.0 103.316 2.010 -999.990 -999.990 1.033 ..P WKT 2010 07 14 01 54 55 31.3200 -97.3300 251.000 457.0 97.384 3.300 -999.990 -999.990 0.974 ..P WKT 2010 07 14 02 04 55 31.3200 -97.3300 251.000 30.0 100.268 2.540 -999.990 -999.990 1.003 ..P WKT 2010 07 14 02 09 55 31.3200 -97.3300 251.000 122.0 92.344 2.630 -999.990 -999.990 0.923 ..P WKT 2010 07 14 02 14 55 31.3200 -97.3300 251.000 457.0 84.420 2.760 -999.990 -999.990 0.844 ..P WKT 2010 07 14 02 19 55 31.3200 -97.3300 251.000 30.0 120.294 2.530 -999.990 -999.990 1.203 ..P WKT 2010 07 14 02 24 55 31.3200 -97.3300 251.000 122.0 96.192 2.300 -999.990 -999.990 0.962 ..P WKT 2010 07 14 02 29 55 31.3200 -97.3300 251.000 457.0 87.154 1.890 -999.990 -999.990 0.872 ..P WKT 2010 07 14 02 39 55 31.3200 -97.3300 251.000 30.0 88.862 1.370 -999.990 -999.990 0.889 ..P WKT 2010 07 14 02 44 55 31.3200 -97.3300 251.000 122.0 95.424 3.390 -999.990 -999.990 0.954 ..P WKT 2010 07 14 02 49 55 31.3200 -97.3300 251.000 457.0 82.325 3.050 -999.990 -999.990 0.823 ..P WKT 2010 07 14 02 54 55 31.3200 -97.3300 251.000 30.0 90.558 1.840 -999.990 -999.990 0.906 ..P WKT 2010 07 14 02 59 55 31.3200 -97.3300 251.000 122.0 94.191 1.910 -999.990 -999.990 0.942 ..P WKT 2010 07 14 03 04 55 31.3200 -97.3300 251.000 457.0 84.161 2.690 -999.990 -999.990 0.842 ..P WKT 2010 07 14 03 14 55 31.3200 -97.3300 251.000 30.0 90.270 2.530 -999.990 -999.990 0.903 ..P WKT 2010 07 14 03 19 55 31.3200 -97.3300 251.000 122.0 97.486 4.010 -999.990 -999.990 0.975 ..P WKT 2010 07 14 03 24 55 31.3200 -97.3300 251.000 457.0 88.393 2.810 -999.990 -999.990 0.884 ..P WKT 2010 07 14 03 29 55 31.3200 -97.3300 251.000 30.0 97.281 3.800 -999.990 -999.990 0.973 ..P WKT 2010 07 14 03 34 55 31.3200 -97.3300 251.000 122.0 93.764 3.980 -999.990 -999.990 0.938 ..P WKT 2010 07 14 03 39 55 31.3200 -97.3300 251.000 457.0 92.059 3.610 -999.990 -999.990 0.921 ..P WKT 2010 07 14 03 49 55 31.3200 -97.3300 251.000 30.0 89.308 3.850 -999.990 -999.990 0.893 ..P WKT 2010 07 14 03 54 55 31.3200 -97.3300 251.000 122.0 88.957 3.460 -999.990 -999.990 0.890 ..P WKT 2010 07 14 03 59 55 31.3200 -97.3300 251.000 457.0 86.517 3.000 -999.990 -999.990 0.865 ..P WKT 2010 07 14 04 04 55 31.3200 -97.3300 251.000 30.0 84.773 4.230 -999.990 -999.990 0.848 ..P WKT 2010 07 14 04 09 55 31.3200 -97.3300 251.000 122.0 87.627 2.850 -999.990 -999.990 0.876 ..P WKT 2010 07 14 04 14 55 31.3200 -97.3300 251.000 457.0 83.934 2.580 -999.990 -999.990 0.839 ..P WKT 2010 07 14 04 24 55 31.3200 -97.3300 251.000 30.0 83.492 2.350 -999.990 -999.990 0.835 ..P WKT 2010 07 14 04 29 55 31.3200 -97.3300 251.000 122.0 89.807 3.230 -999.990 -999.990 0.898 ..P WKT 2010 07 14 04 34 55 31.3200 -97.3300 251.000 457.0 81.916 3.810 -999.990 -999.990 0.819 ..P WKT 2010 07 14 04 39 55 31.3200 -97.3300 251.000 30.0 89.066 3.690 -999.990 -999.990 0.891 ..P WKT 2010 07 14 04 44 55 31.3200 -97.3300 251.000 122.0 93.987 3.430 -999.990 -999.990 0.940 ..P WKT 2010 07 14 04 49 55 31.3200 -97.3300 251.000 457.0 85.401 2.570 -999.990 -999.990 0.854 ..P WKT 2010 07 14 05 04 55 31.3200 -97.3300 251.000 30.0 97.576 3.700 -999.990 -999.990 0.976 ..P WKT 2010 07 14 05 09 55 31.3200 -97.3300 251.000 122.0 98.697 5.350 -999.990 -999.990 0.987 ..P WKT 2010 07 14 05 14 55 31.3200 -97.3300 251.000 457.0 90.073 3.710 -999.990 -999.990 0.901 ..P WKT 2010 07 14 05 19 55 31.3200 -97.3300 251.000 30.0 94.257 2.810 -999.990 -999.990 0.943 ..P WKT 2010 07 14 05 24 55 31.3200 -97.3300 251.000 122.0 101.224 2.090 -999.990 -999.990 1.012 ..P WKT 2010 07 14 05 29 55 31.3200 -97.3300 251.000 457.0 89.540 1.840 -999.990 -999.990 0.895 ..P WKT 2010 07 14 05 39 55 31.3200 -97.3300 251.000 30.0 97.666 1.580 -999.990 -999.990 0.977 ..P WKT 2010 07 14 05 44 55 31.3200 -97.3300 251.000 122.0 97.991 1.960 -999.990 -999.990 0.980 ..P WKT 2010 07 14 05 49 55 31.3200 -97.3300 251.000 457.0 80.784 1.840 -999.990 -999.990 0.808 ..P WKT 2010 07 14 05 54 55 31.3200 -97.3300 251.000 30.0 96.972 2.210 -999.990 -999.990 0.970 ..P WKT 2010 07 14 05 59 55 31.3200 -97.3300 251.000 122.0 92.010 1.850 -999.990 -999.990 0.920 ..P WKT 2010 07 14 06 04 55 31.3200 -97.3300 251.000 457.0 86.492 3.020 -999.990 -999.990 0.865 ..P WKT 2010 07 14 06 14 55 31.3200 -97.3300 251.000 30.0 99.445 2.120 -999.990 -999.990 0.994 ..P WKT 2010 07 14 06 19 55 31.3200 -97.3300 251.000 122.0 94.821 4.500 -999.990 -999.990 0.948 ..P WKT 2010 07 14 06 24 55 31.3200 -97.3300 251.000 457.0 87.973 2.530 -999.990 -999.990 0.880 ..P WKT 2010 07 14 06 29 55 31.3200 -97.3300 251.000 30.0 93.366 2.930 -999.990 -999.990 0.934 ..P WKT 2010 07 14 06 34 55 31.3200 -97.3300 251.000 122.0 100.148 4.060 -999.990 -999.990 1.001 ..P WKT 2010 07 14 06 39 55 31.3200 -97.3300 251.000 457.0 91.911 4.020 -999.990 -999.990 0.919 ..P WKT 2010 07 14 06 49 55 31.3200 -97.3300 251.000 30.0 94.111 4.340 -999.990 -999.990 0.941 ..P WKT 2010 07 14 06 54 55 31.3200 -97.3300 251.000 122.0 93.283 5.060 -999.990 -999.990 0.933 ..P WKT 2010 07 14 06 59 55 31.3200 -97.3300 251.000 457.0 89.120 3.700 -999.990 -999.990 0.891 ..P WKT 2010 07 14 07 04 55 31.3200 -97.3300 251.000 30.0 89.545 3.620 -999.990 -999.990 0.895 ..P WKT 2010 07 14 07 09 55 31.3200 -97.3300 251.000 122.0 86.912 3.360 -999.990 -999.990 0.869 ..P WKT 2010 07 14 07 14 55 31.3200 -97.3300 251.000 457.0 78.161 3.290 -999.990 -999.990 0.782 ..P WKT 2010 07 14 07 24 55 31.3200 -97.3300 251.000 30.0 89.198 2.440 -999.990 -999.990 0.892 ..P WKT 2010 07 14 07 29 55 31.3200 -97.3300 251.000 122.0 96.890 2.840 -999.990 -999.990 0.969 ..P WKT 2010 07 14 07 34 55 31.3200 -97.3300 251.000 457.0 90.544 3.080 -999.990 -999.990 0.905 ..P WKT 2010 07 14 07 39 55 31.3200 -97.3300 251.000 30.0 85.310 2.820 -999.990 -999.990 0.853 ..P WKT 2010 07 14 07 44 55 31.3200 -97.3300 251.000 122.0 94.946 3.210 -999.990 -999.990 0.949 ..P WKT 2010 07 14 07 49 55 31.3200 -97.3300 251.000 457.0 86.934 3.760 -999.990 -999.990 0.869 ..P WKT 2010 07 14 07 59 55 31.3200 -97.3300 251.000 30.0 91.673 2.600 -999.990 -999.990 0.917 ..P WKT 2010 07 14 08 04 55 31.3200 -97.3300 251.000 122.0 87.334 3.360 -999.990 -999.990 0.873 ..P WKT 2010 07 14 08 09 55 31.3200 -97.3300 251.000 457.0 84.384 3.970 -999.990 -999.990 0.844 ..P WKT 2010 07 14 08 14 55 31.3200 -97.3300 251.000 30.0 87.965 3.640 -999.990 -999.990 0.880 ..P WKT 2010 07 14 08 19 55 31.3200 -97.3300 251.000 122.0 88.349 3.950 -999.990 -999.990 0.883 ..P WKT 2010 07 14 08 24 55 31.3200 -97.3300 251.000 457.0 78.317 3.760 -999.990 -999.990 0.783 ..P WKT 2010 07 14 08 34 55 31.3200 -97.3300 251.000 30.0 80.655 3.230 -999.990 -999.990 0.807 ..P WKT 2010 07 14 08 39 55 31.3200 -97.3300 251.000 122.0 93.023 3.630 -999.990 -999.990 0.930 ..P WKT 2010 07 14 08 44 55 31.3200 -97.3300 251.000 457.0 90.669 3.850 -999.990 -999.990 0.907 ..P WKT 2010 07 14 08 49 55 31.3200 -97.3300 251.000 30.0 86.373 3.970 -999.990 -999.990 0.864 ..P WKT 2010 07 14 08 54 55 31.3200 -97.3300 251.000 122.0 94.295 4.000 -999.990 -999.990 0.943 ..P WKT 2010 07 14 08 59 55 31.3200 -97.3300 251.000 457.0 87.776 4.230 -999.990 -999.990 0.878 ..P WKT 2010 07 14 09 09 55 31.3200 -97.3300 251.000 30.0 84.639 3.810 -999.990 -999.990 0.846 ..P WKT 2010 07 14 09 14 55 31.3200 -97.3300 251.000 122.0 91.905 3.900 -999.990 -999.990 0.919 ..P WKT 2010 07 14 09 19 55 31.3200 -97.3300 251.000 457.0 85.289 4.450 -999.990 -999.990 0.853 ..P WKT 2010 07 14 09 24 55 31.3200 -97.3300 251.000 30.0 83.393 3.630 -999.990 -999.990 0.834 ..P WKT 2010 07 14 09 29 55 31.3200 -97.3300 251.000 122.0 88.715 2.880 -999.990 -999.990 0.887 ..P WKT 2010 07 14 09 34 55 31.3200 -97.3300 251.000 457.0 82.933 3.370 -999.990 -999.990 0.829 ..P WKT 2010 07 14 09 44 55 31.3200 -97.3300 251.000 30.0 84.416 3.160 -999.990 -999.990 0.844 ..P WKT 2010 07 14 09 49 55 31.3200 -97.3300 251.000 122.0 88.349 2.860 -999.990 -999.990 0.883 ..P WKT 2010 07 14 09 54 55 31.3200 -97.3300 251.000 457.0 82.291 3.060 -999.990 -999.990 0.823 ..P WKT 2010 07 14 09 59 55 31.3200 -97.3300 251.000 30.0 83.171 4.730 -999.990 -999.990 0.832 ..P WKT 2010 07 14 10 04 55 31.3200 -97.3300 251.000 122.0 81.832 4.010 -999.990 -999.990 0.818 ..P WKT 2010 07 14 10 09 55 31.3200 -97.3300 251.000 457.0 86.319 3.150 -999.990 -999.990 0.863 ..P WKT 2010 07 14 10 19 55 31.3200 -97.3300 251.000 30.0 86.195 4.330 -999.990 -999.990 0.862 ..P WKT 2010 07 14 10 24 55 31.3200 -97.3300 251.000 122.0 90.742 3.110 -999.990 -999.990 0.907 ..P WKT 2010 07 14 10 29 55 31.3200 -97.3300 251.000 457.0 86.409 3.910 -999.990 -999.990 0.864 ..P WKT 2010 07 14 10 34 55 31.3200 -97.3300 251.000 30.0 96.225 2.930 -999.990 -999.990 0.962 ..P WKT 2010 07 14 10 39 55 31.3200 -97.3300 251.000 122.0 93.280 3.290 -999.990 -999.990 0.933 ..P WKT 2010 07 14 10 44 55 31.3200 -97.3300 251.000 457.0 88.117 2.760 -999.990 -999.990 0.881 ..P WKT 2010 07 14 10 54 55 31.3200 -97.3300 251.000 30.0 89.083 2.660 -999.990 -999.990 0.891 ..P WKT 2010 07 14 10 59 55 31.3200 -97.3300 251.000 122.0 90.220 2.320 -999.990 -999.990 0.902 ..P WKT 2010 07 14 11 04 55 31.3200 -97.3300 251.000 457.0 83.731 2.690 -999.990 -999.990 0.837 ..P WKT 2010 07 14 11 09 55 31.3200 -97.3300 251.000 30.0 87.225 4.450 -999.990 -999.990 0.872 ..P WKT 2010 07 14 11 14 55 31.3200 -97.3300 251.000 122.0 96.680 2.030 -999.990 -999.990 0.967 ..P WKT 2010 07 14 11 19 55 31.3200 -97.3300 251.000 457.0 85.339 2.170 -999.990 -999.990 0.853 ..P WKT 2010 07 14 11 29 55 31.3200 -97.3300 251.000 30.0 88.857 1.840 -999.990 -999.990 0.889 ..P WKT 2010 07 14 11 34 55 31.3200 -97.3300 251.000 122.0 90.268 2.710 -999.990 -999.990 0.903 ..P WKT 2010 07 14 11 39 55 31.3200 -97.3300 251.000 457.0 92.511 2.900 -999.990 -999.990 0.925 ..P WKT 2010 07 14 11 44 55 31.3200 -97.3300 251.000 30.0 90.734 4.080 -999.990 -999.990 0.907 ..P WKT 2010 07 14 11 49 55 31.3200 -97.3300 251.000 122.0 88.541 2.880 -999.990 -999.990 0.885 ..P WKT 2010 07 14 12 09 55 31.3200 -97.3300 251.000 457.0 91.432 4.000 -999.990 -999.990 0.914 ..P WKT 2010 07 14 12 10 25 31.3200 -97.3300 251.000 457.0 88.277 3.780 -999.990 -999.990 0.883 ..P WKT 2010 07 14 12 10 55 31.3200 -97.3300 251.000 457.0 87.755 3.580 -999.990 -999.990 0.878 ..P WKT 2010 07 14 12 11 25 31.3200 -97.3300 251.000 457.0 87.233 3.710 -999.990 -999.990 0.872 ..P WKT 2010 07 14 12 11 55 31.3200 -97.3300 251.000 457.0 86.156 3.770 -999.990 -999.990 0.862 ..P WKT 2010 07 14 12 12 25 31.3200 -97.3300 251.000 457.0 88.959 4.300 -999.990 -999.990 0.890 ..P WKT 2010 07 14 12 12 55 31.3200 -97.3300 251.000 457.0 90.515 4.690 -999.990 -999.990 0.905 ..P WKT 2010 07 14 12 13 25 31.3200 -97.3300 251.000 457.0 83.342 3.770 -999.990 -999.990 0.833 ..P WKT 2010 07 14 12 13 55 31.3200 -97.3300 251.000 457.0 86.977 3.430 -999.990 -999.990 0.870 ..P WKT 2010 07 14 12 14 25 31.3200 -97.3300 251.000 457.0 85.484 3.790 -999.990 -999.990 0.855 ..P WKT 2010 07 14 12 14 55 31.3200 -97.3300 251.000 457.0 83.992 3.770 -999.990 -999.990 0.840 ..P WKT 2010 07 14 12 19 55 31.3200 -97.3300 251.000 30.0 91.238 3.290 -999.990 -999.990 0.912 ..P WKT 2010 07 14 12 24 55 31.3200 -97.3300 251.000 122.0 92.526 3.840 -999.990 -999.990 0.925 ..P WKT 2010 07 14 12 29 55 31.3200 -97.3300 251.000 457.0 87.996 3.590 -999.990 -999.990 0.880 ..P WKT 2010 07 14 12 34 55 31.3200 -97.3300 251.000 30.0 96.073 2.910 -999.990 -999.990 0.961 ..P WKT 2010 07 14 12 39 55 31.3200 -97.3300 251.000 122.0 99.024 2.340 -999.990 -999.990 0.990 ..P WKT 2010 07 14 12 44 55 31.3200 -97.3300 251.000 457.0 95.463 2.000 -999.990 -999.990 0.955 ..P WKT 2010 07 14 12 54 55 31.3200 -97.3300 251.000 30.0 106.320 2.400 -999.990 -999.990 1.063 ..P WKT 2010 07 14 12 59 55 31.3200 -97.3300 251.000 122.0 96.633 2.330 -999.990 -999.990 0.966 ..P WKT 2010 07 14 13 04 55 31.3200 -97.3300 251.000 457.0 83.344 3.710 -999.990 -999.990 0.833 ..P WKT 2010 07 14 13 09 55 31.3200 -97.3300 251.000 30.0 108.013 2.360 -999.990 -999.990 1.080 ..P WKT 2010 07 14 13 14 55 31.3200 -97.3300 251.000 122.0 102.205 2.150 -999.990 -999.990 1.022 ..P WKT 2010 07 14 13 19 55 31.3200 -97.3300 251.000 457.0 90.302 2.180 -999.990 -999.990 0.903 ..P WKT 2010 07 14 13 29 55 31.3200 -97.3300 251.000 30.0 105.877 3.240 -999.990 -999.990 1.059 ..P WKT 2010 07 14 13 34 55 31.3200 -97.3300 251.000 122.0 101.772 2.900 -999.990 -999.990 1.018 ..P WKT 2010 07 14 13 39 55 31.3200 -97.3300 251.000 457.0 92.125 2.990 -999.990 -999.990 0.921 ..P WKT 2010 07 14 13 44 55 31.3200 -97.3300 251.000 30.0 100.209 3.320 -999.990 -999.990 1.002 ..P WKT 2010 07 14 13 49 55 31.3200 -97.3300 251.000 122.0 94.165 2.210 -999.990 -999.990 0.942 ..P WKT 2010 07 14 13 54 55 31.3200 -97.3300 251.000 457.0 90.890 2.240 -999.990 -999.990 0.909 ..P WKT 2010 07 14 14 04 55 31.3200 -97.3300 251.000 30.0 97.719 2.620 -999.990 -999.990 0.977 ..P WKT 2010 07 14 14 09 55 31.3200 -97.3300 251.000 122.0 98.125 2.550 -999.990 -999.990 0.981 ..P WKT 2010 07 14 14 14 55 31.3200 -97.3300 251.000 457.0 92.436 4.290 -999.990 -999.990 0.924 ..P WKT 2010 07 14 14 19 55 31.3200 -97.3300 251.000 30.0 161.265 4.650 -999.990 -999.990 1.613 ..P WKT 2010 07 14 14 24 55 31.3200 -97.3300 251.000 122.0 99.343 5.020 -999.990 -999.990 0.993 ..P WKT 2010 07 14 14 29 55 31.3200 -97.3300 251.000 457.0 88.669 4.820 -999.990 -999.990 0.887 ..P WKT 2010 07 14 14 39 55 31.3200 -97.3300 251.000 30.0 93.459 5.080 -999.990 -999.990 0.935 ..P WKT 2010 07 14 14 44 55 31.3200 -97.3300 251.000 122.0 101.304 5.250 -999.990 -999.990 1.013 ..P WKT 2010 07 14 14 49 55 31.3200 -97.3300 251.000 457.0 92.391 4.440 -999.990 -999.990 0.924 ..P WKT 2010 07 14 14 54 55 31.3200 -97.3300 251.000 30.0 102.037 3.960 -999.990 -999.990 1.020 ..P WKT 2010 07 14 14 59 55 31.3200 -97.3300 251.000 122.0 101.849 3.550 -999.990 -999.990 1.018 ..P WKT 2010 07 14 15 04 55 31.3200 -97.3300 251.000 457.0 93.906 3.380 -999.990 -999.990 0.939 ..P WKT 2010 07 14 15 14 55 31.3200 -97.3300 251.000 30.0 103.246 2.690 -999.990 -999.990 1.032 ..P WKT 2010 07 14 15 19 55 31.3200 -97.3300 251.000 122.0 105.293 3.030 -999.990 -999.990 1.053 ..P WKT 2010 07 14 15 24 55 31.3200 -97.3300 251.000 457.0 95.847 2.850 -999.990 -999.990 0.958 ..P WKT 2010 07 14 15 29 55 31.3200 -97.3300 251.000 30.0 97.480 3.380 -999.990 -999.990 0.975 ..P WKT 2010 07 14 15 34 55 31.3200 -97.3300 251.000 122.0 109.360 2.740 -999.990 -999.990 1.094 ..P WKT 2010 07 14 15 39 55 31.3200 -97.3300 251.000 457.0 103.238 4.290 -999.990 -999.990 1.032 ..P WKT 2010 07 14 15 49 55 31.3200 -97.3300 251.000 30.0 104.505 2.770 -999.990 -999.990 1.045 ..P WKT 2010 07 14 15 54 55 31.3200 -97.3300 251.000 122.0 103.170 2.880 -999.990 -999.990 1.032 ..P WKT 2010 07 14 15 59 55 31.3200 -97.3300 251.000 457.0 97.820 2.870 -999.990 -999.990 0.978 ..P WKT 2010 07 14 16 04 55 31.3200 -97.3300 251.000 30.0 129.994 5.880 -999.990 -999.990 1.300 ..P WKT 2010 07 14 16 09 55 31.3200 -97.3300 251.000 122.0 101.242 2.970 -999.990 -999.990 1.012 ..P WKT 2010 07 14 16 14 55 31.3200 -97.3300 251.000 457.0 104.339 3.170 -999.990 -999.990 1.043 ..P WKT 2010 07 14 16 24 55 31.3200 -97.3300 251.000 30.0 106.416 5.150 -999.990 -999.990 1.064 ..P WKT 2010 07 14 16 29 55 31.3200 -97.3300 251.000 122.0 113.706 3.300 -999.990 -999.990 1.137 ..P WKT 2010 07 14 16 34 55 31.3200 -97.3300 251.000 457.0 102.857 2.640 -999.990 -999.990 1.029 ..P WKT 2010 07 14 16 39 55 31.3200 -97.3300 251.000 30.0 118.038 2.940 -999.990 -999.990 1.180 ..P WKT 2010 07 14 16 44 55 31.3200 -97.3300 251.000 122.0 116.881 2.970 -999.990 -999.990 1.169 ..P WKT 2010 07 14 16 49 55 31.3200 -97.3300 251.000 457.0 110.741 2.830 -999.990 -999.990 1.107 ..P WKT 2010 07 14 17 04 55 31.3200 -97.3300 251.000 30.0 113.758 6.610 -999.990 -999.990 1.138 ..P WKT 2010 07 14 17 09 55 31.3200 -97.3300 251.000 122.0 101.309 3.050 -999.990 -999.990 1.013 ..P WKT 2010 07 14 17 14 55 31.3200 -97.3300 251.000 457.0 98.827 3.490 -999.990 -999.990 0.988 ..P WKT 2010 07 14 17 19 55 31.3200 -97.3300 251.000 30.0 145.352 18.360 -999.990 -999.990 1.454 ..P WKT 2010 07 14 17 24 55 31.3200 -97.3300 251.000 122.0 104.108 3.540 -999.990 -999.990 1.041 ..P WKT 2010 07 14 17 29 55 31.3200 -97.3300 251.000 457.0 95.536 3.350 -999.990 -999.990 0.955 ..P WKT 2010 07 14 17 39 55 31.3200 -97.3300 251.000 30.0 105.524 4.140 -999.990 -999.990 1.055 ..P WKT 2010 07 14 17 44 55 31.3200 -97.3300 251.000 122.0 107.472 4.710 -999.990 -999.990 1.075 ..P WKT 2010 07 14 17 49 55 31.3200 -97.3300 251.000 457.0 90.871 3.890 -999.990 -999.990 0.909 ..P WKT 2010 07 14 17 54 55 31.3200 -97.3300 251.000 30.0 102.786 3.790 -999.990 -999.990 1.028 ..P WKT 2010 07 14 17 59 55 31.3200 -97.3300 251.000 122.0 98.644 3.550 -999.990 -999.990 0.986 ..P WKT 2010 07 14 18 04 55 31.3200 -97.3300 251.000 457.0 98.377 4.090 -999.990 -999.990 0.984 ..P WKT 2010 07 14 18 14 55 31.3200 -97.3300 251.000 30.0 101.681 3.780 -999.990 -999.990 1.017 ..P WKT 2010 07 14 18 19 55 31.3200 -97.3300 251.000 122.0 101.375 4.280 -999.990 -999.990 1.014 ..P WKT 2010 07 14 18 24 55 31.3200 -97.3300 251.000 457.0 91.103 4.760 -999.990 -999.990 0.911 ..P WKT 2010 07 14 18 29 55 31.3200 -97.3300 251.000 30.0 99.656 3.490 -999.990 -999.990 0.997 ..P WKT 2010 07 14 18 34 55 31.3200 -97.3300 251.000 122.0 99.350 3.470 -999.990 -999.990 0.993 ..P WKT 2010 07 14 18 39 55 31.3200 -97.3300 251.000 457.0 90.186 3.790 -999.990 -999.990 0.902 ..P WKT 2010 07 14 18 49 55 31.3200 -97.3300 251.000 30.0 93.707 3.460 -999.990 -999.990 0.937 ..P WKT 2010 07 14 18 54 55 31.3200 -97.3300 251.000 122.0 95.319 3.560 -999.990 -999.990 0.953 ..P WKT 2010 07 14 18 59 55 31.3200 -97.3300 251.000 457.0 87.519 3.520 -999.990 -999.990 0.875 ..P WKT 2010 07 14 19 04 55 31.3200 -97.3300 251.000 30.0 88.993 3.500 -999.990 -999.990 0.890 ..P WKT 2010 07 14 19 09 55 31.3200 -97.3300 251.000 122.0 95.864 3.030 -999.990 -999.990 0.959 ..P WKT 2010 07 14 19 14 55 31.3200 -97.3300 251.000 457.0 92.218 3.340 -999.990 -999.990 0.922 ..P WKT 2010 07 14 19 24 55 31.3200 -97.3300 251.000 30.0 85.852 3.290 -999.990 -999.990 0.859 ..P WKT 2010 07 14 19 29 55 31.3200 -97.3300 251.000 122.0 101.955 3.610 -999.990 -999.990 1.020 ..P WKT 2010 07 14 19 34 55 31.3200 -97.3300 251.000 457.0 85.261 3.460 -999.990 -999.990 0.853 ..P WKT 2010 07 14 19 39 55 31.3200 -97.3300 251.000 30.0 98.457 4.060 -999.990 -999.990 0.985 ..P WKT 2010 07 14 19 44 55 31.3200 -97.3300 251.000 122.0 100.307 3.160 -999.990 -999.990 1.003 ..P WKT 2010 07 14 19 49 55 31.3200 -97.3300 251.000 457.0 90.808 3.260 -999.990 -999.990 0.908 ..P WKT 2010 07 14 19 59 55 31.3200 -97.3300 251.000 30.0 92.273 4.100 -999.990 -999.990 0.923 ..P WKT 2010 07 14 20 04 55 31.3200 -97.3300 251.000 122.0 101.712 3.520 -999.990 -999.990 1.017 ..P WKT 2010 07 14 20 09 55 31.3200 -97.3300 251.000 457.0 94.824 3.140 -999.990 -999.990 0.948 ..P WKT 2010 07 14 20 14 55 31.3200 -97.3300 251.000 30.0 101.911 3.920 -999.990 -999.990 1.019 ..P WKT 2010 07 14 20 19 55 31.3200 -97.3300 251.000 122.0 106.230 2.980 -999.990 -999.990 1.062 ..P WKT 2010 07 14 20 24 55 31.3200 -97.3300 251.000 457.0 96.021 2.990 -999.990 -999.990 0.960 ..P WKT 2010 07 14 20 34 55 31.3200 -97.3300 251.000 30.0 101.182 2.790 -999.990 -999.990 1.012 ..P WKT 2010 07 14 20 39 55 31.3200 -97.3300 251.000 122.0 104.513 3.240 -999.990 -999.990 1.045 ..P WKT 2010 07 14 20 44 55 31.3200 -97.3300 251.000 457.0 100.649 2.760 -999.990 -999.990 1.006 ..P WKT 2010 07 14 20 49 55 31.3200 -97.3300 251.000 30.0 102.319 2.940 -999.990 -999.990 1.023 ..P WKT 2010 07 14 20 54 55 31.3200 -97.3300 251.000 122.0 99.009 3.280 -999.990 -999.990 0.990 ..P WKT 2010 07 14 20 59 55 31.3200 -97.3300 251.000 457.0 92.933 3.130 -999.990 -999.990 0.929 ..P WKT 2010 07 14 21 09 55 31.3200 -97.3300 251.000 30.0 95.405 3.020 -999.990 -999.990 0.954 ..P WKT 2010 07 14 21 14 55 31.3200 -97.3300 251.000 122.0 102.846 3.130 -999.990 -999.990 1.028 ..P WKT 2010 07 14 21 19 55 31.3200 -97.3300 251.000 457.0 89.259 3.560 -999.990 -999.990 0.893 ..P WKT 2010 07 14 21 24 55 31.3200 -97.3300 251.000 30.0 97.531 3.700 -999.990 -999.990 0.975 ..P WKT 2010 07 14 21 29 55 31.3200 -97.3300 251.000 122.0 99.439 3.750 -999.990 -999.990 0.994 ..P WKT 2010 07 14 21 34 55 31.3200 -97.3300 251.000 457.0 94.430 2.940 -999.990 -999.990 0.944 ..P WKT 2010 07 14 21 44 55 31.3200 -97.3300 251.000 30.0 91.249 2.940 -999.990 -999.990 0.912 ..P WKT 2010 07 14 21 49 55 31.3200 -97.3300 251.000 122.0 93.908 3.220 -999.990 -999.990 0.939 ..P WKT 2010 07 14 21 54 55 31.3200 -97.3300 251.000 457.0 88.543 3.370 -999.990 -999.990 0.885 ..P WKT 2010 07 14 21 59 55 31.3200 -97.3300 251.000 30.0 92.862 3.220 -999.990 -999.990 0.929 ..P WKT 2010 07 14 22 04 55 31.3200 -97.3300 251.000 122.0 98.563 2.810 -999.990 -999.990 0.986 ..P WKT 2010 07 14 22 09 55 31.3200 -97.3300 251.000 457.0 89.326 2.800 -999.990 -999.990 0.893 ..P WKT 2010 07 14 22 19 55 31.3200 -97.3300 251.000 30.0 96.698 4.430 -999.990 -999.990 0.967 ..P WKT 2010 07 14 22 24 55 31.3200 -97.3300 251.000 122.0 101.411 3.480 -999.990 -999.990 1.014 ..P WKT 2010 07 14 22 29 55 31.3200 -97.3300 251.000 457.0 98.517 4.020 -999.990 -999.990 0.985 ..P WKT 2010 07 14 22 34 55 31.3200 -97.3300 251.000 30.0 95.900 3.500 -999.990 -999.990 0.959 ..P WKT 2010 07 14 22 39 55 31.3200 -97.3300 251.000 122.0 101.442 3.420 -999.990 -999.990 1.014 ..P WKT 2010 07 14 22 44 55 31.3200 -97.3300 251.000 457.0 92.878 4.490 -999.990 -999.990 0.929 ..P WKT 2010 07 14 22 54 55 31.3200 -97.3300 251.000 30.0 97.819 3.720 -999.990 -999.990 0.978 ..P WKT 2010 07 14 22 59 55 31.3200 -97.3300 251.000 122.0 105.514 3.790 -999.990 -999.990 1.055 ..P WKT 2010 07 14 23 04 55 31.3200 -97.3300 251.000 457.0 95.093 3.890 -999.990 -999.990 0.951 ..P WKT 2010 07 14 23 09 55 31.3200 -97.3300 251.000 30.0 92.003 3.810 -999.990 -999.990 0.920 ..P WKT 2010 07 14 23 14 55 31.3200 -97.3300 251.000 122.0 102.187 3.690 -999.990 -999.990 1.022 ..P WKT 2010 07 14 23 19 55 31.3200 -97.3300 251.000 457.0 88.862 4.140 -999.990 -999.990 0.889 ..P WKT 2010 07 14 23 29 55 31.3200 -97.3300 251.000 30.0 94.477 4.570 -999.990 -999.990 0.945 ..P WKT 2010 07 14 23 34 55 31.3200 -97.3300 251.000 122.0 101.799 4.220 -999.990 -999.990 1.018 ..P WKT 2010 07 14 23 39 55 31.3200 -97.3300 251.000 457.0 90.592 3.820 -999.990 -999.990 0.906 ..P WKT 2010 07 14 23 44 55 31.3200 -97.3300 251.000 30.0 96.669 5.130 -999.990 -999.990 0.967 ..P WKT 2010 07 14 23 49 55 31.3200 -97.3300 251.000 122.0 103.023 4.100 -999.990 -999.990 1.030 ..P WKT 2010 07 15 00 09 55 31.3200 -97.3300 251.000 457.0 96.488 4.200 -999.990 -999.990 0.965 ..P WKT 2010 07 15 00 10 25 31.3200 -97.3300 251.000 457.0 94.020 4.240 -999.990 -999.990 0.940 ..P WKT 2010 07 15 00 10 55 31.3200 -97.3300 251.000 457.0 89.753 3.510 -999.990 -999.990 0.898 ..P WKT 2010 07 15 00 11 25 31.3200 -97.3300 251.000 457.0 86.731 5.330 -999.990 -999.990 0.867 ..P WKT 2010 07 15 00 11 55 31.3200 -97.3300 251.000 457.0 86.615 5.540 -999.990 -999.990 0.866 ..P WKT 2010 07 15 00 12 25 31.3200 -97.3300 251.000 457.0 94.519 3.550 -999.990 -999.990 0.945 ..P WKT 2010 07 15 00 12 55 31.3200 -97.3300 251.000 457.0 88.593 5.500 -999.990 -999.990 0.886 ..P WKT 2010 07 15 00 13 25 31.3200 -97.3300 251.000 457.0 85.986 3.820 -999.990 -999.990 0.860 ..P WKT 2010 07 15 00 13 55 31.3200 -97.3300 251.000 457.0 83.517 4.070 -999.990 -999.990 0.835 ..P WKT 2010 07 15 00 14 25 31.3200 -97.3300 251.000 457.0 86.581 4.240 -999.990 -999.990 0.866 ..P WKT 2010 07 15 00 14 55 31.3200 -97.3300 251.000 457.0 93.517 3.590 -999.990 -999.990 0.935 ..P WKT 2010 07 15 00 19 55 31.3200 -97.3300 251.000 30.0 86.674 3.650 -999.990 -999.990 0.867 ..P WKT 2010 07 15 00 24 55 31.3200 -97.3300 251.000 122.0 99.333 3.150 -999.990 -999.990 0.993 ..P WKT 2010 07 15 00 29 55 31.3200 -97.3300 251.000 457.0 92.352 3.830 -999.990 -999.990 0.924 ..P WKT 2010 07 15 00 34 55 31.3200 -97.3300 251.000 30.0 95.053 2.940 -999.990 -999.990 0.951 ..P WKT 2010 07 15 00 39 55 31.3200 -97.3300 251.000 122.0 101.903 3.030 -999.990 -999.990 1.019 ..P WKT 2010 07 15 00 44 55 31.3200 -97.3300 251.000 457.0 89.941 3.030 -999.990 -999.990 0.899 ..P WKT 2010 07 15 00 54 55 31.3200 -97.3300 251.000 30.0 94.346 4.330 -999.990 -999.990 0.943 ..P WKT 2010 07 15 00 59 55 31.3200 -97.3300 251.000 122.0 103.797 3.080 -999.990 -999.990 1.038 ..P WKT 2010 07 15 01 04 55 31.3200 -97.3300 251.000 457.0 97.754 4.960 -999.990 -999.990 0.978 ..P WKT 2010 07 15 01 09 55 31.3200 -97.3300 251.000 30.0 98.351 3.580 -999.990 -999.990 0.984 ..P WKT 2010 07 15 01 14 55 31.3200 -97.3300 251.000 122.0 97.842 3.530 -999.990 -999.990 0.978 ..P WKT 2010 07 15 01 19 55 31.3200 -97.3300 251.000 457.0 100.376 3.150 -999.990 -999.990 1.004 ..P WKT 2010 07 15 01 29 55 31.3200 -97.3300 251.000 30.0 104.734 3.170 -999.990 -999.990 1.047 ..P WKT 2010 07 15 01 34 55 31.3200 -97.3300 251.000 122.0 103.790 3.090 -999.990 -999.990 1.038 ..P WKT 2010 07 15 01 39 55 31.3200 -97.3300 251.000 457.0 97.865 3.790 -999.990 -999.990 0.979 ..P WKT 2010 07 15 01 44 55 31.3200 -97.3300 251.000 30.0 106.053 4.060 -999.990 -999.990 1.061 ..P WKT 2010 07 15 01 49 55 31.3200 -97.3300 251.000 122.0 103.172 3.640 -999.990 -999.990 1.032 ..P WKT 2010 07 15 01 54 55 31.3200 -97.3300 251.000 457.0 88.113 3.120 -999.990 -999.990 0.881 ..P WKT 2010 07 15 02 04 55 31.3200 -97.3300 251.000 30.0 108.584 3.330 -999.990 -999.990 1.086 ..P WKT 2010 07 15 02 09 55 31.3200 -97.3300 251.000 122.0 111.731 3.620 -999.990 -999.990 1.117 ..P WKT 2010 07 15 02 14 55 31.3200 -97.3300 251.000 457.0 96.888 2.970 -999.990 -999.990 0.969 ..P WKT 2010 07 15 02 19 55 31.3200 -97.3300 251.000 30.0 100.313 3.670 -999.990 -999.990 1.003 ..P WKT 2010 07 15 02 24 55 31.3200 -97.3300 251.000 122.0 109.551 3.040 -999.990 -999.990 1.096 ..P WKT 2010 07 15 02 29 55 31.3200 -97.3300 251.000 457.0 96.230 2.560 -999.990 -999.990 0.962 ..P WKT 2010 07 15 02 39 55 31.3200 -97.3300 251.000 30.0 112.691 2.540 -999.990 -999.990 1.127 ..P WKT 2010 07 15 02 44 55 31.3200 -97.3300 251.000 122.0 113.408 3.420 -999.990 -999.990 1.134 ..P WKT 2010 07 15 02 49 55 31.3200 -97.3300 251.000 457.0 92.116 3.610 -999.990 -999.990 0.921 ..P WKT 2010 07 15 02 54 55 31.3200 -97.3300 251.000 30.0 107.920 2.520 -999.990 -999.990 1.079 ..P WKT 2010 07 15 02 59 55 31.3200 -97.3300 251.000 122.0 110.437 3.370 -999.990 -999.990 1.104 ..P WKT 2010 07 15 03 04 55 31.3200 -97.3300 251.000 457.0 89.836 2.370 -999.990 -999.990 0.898 ..P WKT 2010 07 15 03 14 55 31.3200 -97.3300 251.000 30.0 105.686 2.630 -999.990 -999.990 1.057 ..P WKT 2010 07 15 03 19 55 31.3200 -97.3300 251.000 122.0 111.961 5.560 -999.990 -999.990 1.120 ..P WKT 2010 07 15 03 24 55 31.3200 -97.3300 251.000 457.0 97.191 2.840 -999.990 -999.990 0.972 ..P WKT 2010 07 15 03 29 55 31.3200 -97.3300 251.000 30.0 107.619 2.310 -999.990 -999.990 1.076 ..P WKT 2010 07 15 03 34 55 31.3200 -97.3300 251.000 122.0 115.002 3.320 -999.990 -999.990 1.150 ..P WKT 2010 07 15 03 39 55 31.3200 -97.3300 251.000 457.0 98.432 2.940 -999.990 -999.990 0.984 ..P WKT 2010 07 15 03 49 55 31.3200 -97.3300 251.000 30.0 109.578 1.930 -999.990 -999.990 1.096 ..P WKT 2010 07 15 03 54 55 31.3200 -97.3300 251.000 122.0 101.156 2.880 -999.990 -999.990 1.012 ..P WKT 2010 07 15 03 59 55 31.3200 -97.3300 251.000 457.0 94.119 2.600 -999.990 -999.990 0.941 ..P WKT 2010 07 15 04 04 55 31.3200 -97.3300 251.000 30.0 95.805 2.980 -999.990 -999.990 0.958 ..P WKT 2010 07 15 04 09 55 31.3200 -97.3300 251.000 122.0 95.275 3.050 -999.990 -999.990 0.953 ..P WKT 2010 07 15 04 14 55 31.3200 -97.3300 251.000 457.0 86.437 4.120 -999.990 -999.990 0.864 ..P WKT 2010 07 15 04 24 55 31.3200 -97.3300 251.000 30.0 100.077 3.090 -999.990 -999.990 1.001 ..P WKT 2010 07 15 04 29 55 31.3200 -97.3300 251.000 122.0 95.968 2.950 -999.990 -999.990 0.960 ..P WKT 2010 07 15 04 34 55 31.3200 -97.3300 251.000 457.0 91.303 4.010 -999.990 -999.990 0.913 ..P WKT 2010 07 15 04 39 55 31.3200 -97.3300 251.000 30.0 99.103 3.060 -999.990 -999.990 0.991 ..P WKT 2010 07 15 04 44 55 31.3200 -97.3300 251.000 122.0 99.147 3.180 -999.990 -999.990 0.991 ..P WKT 2010 07 15 04 49 55 31.3200 -97.3300 251.000 457.0 85.342 3.070 -999.990 -999.990 0.853 ..P WKT 2010 07 15 05 04 55 31.3200 -97.3300 251.000 30.0 101.799 3.500 -999.990 -999.990 1.018 ..P WKT 2010 07 15 05 09 55 31.3200 -97.3300 251.000 122.0 88.952 2.370 -999.990 -999.990 0.890 ..P WKT 2010 07 15 05 14 55 31.3200 -97.3300 251.000 457.0 86.354 2.700 -999.990 -999.990 0.864 ..P WKT 2010 07 15 05 19 55 31.3200 -97.3300 251.000 30.0 100.103 1.880 -999.990 -999.990 1.001 ..P WKT 2010 07 15 05 24 55 31.3200 -97.3300 251.000 122.0 100.552 1.670 -999.990 -999.990 1.006 ..P WKT 2010 07 15 05 29 55 31.3200 -97.3300 251.000 457.0 85.487 1.680 -999.990 -999.990 0.855 ..P WKT 2010 07 15 05 39 55 31.3200 -97.3300 251.000 30.0 92.671 3.650 -999.990 -999.990 0.927 ..P WKT 2010 07 15 05 44 55 31.3200 -97.3300 251.000 122.0 94.694 1.840 -999.990 -999.990 0.947 ..P WKT 2010 07 15 05 49 55 31.3200 -97.3300 251.000 457.0 83.972 2.370 -999.990 -999.990 0.840 ..P WKT 2010 07 15 05 54 55 31.3200 -97.3300 251.000 30.0 88.212 3.590 -999.990 -999.990 0.882 ..P WKT 2010 07 15 05 59 55 31.3200 -97.3300 251.000 122.0 91.899 2.710 -999.990 -999.990 0.919 ..P WKT 2010 07 15 06 04 55 31.3200 -97.3300 251.000 457.0 85.332 3.310 -999.990 -999.990 0.853 ..P WKT 2010 07 15 06 14 55 31.3200 -97.3300 251.000 30.0 88.885 3.150 -999.990 -999.990 0.889 ..P WKT 2010 07 15 06 19 55 31.3200 -97.3300 251.000 122.0 98.173 3.560 -999.990 -999.990 0.982 ..P WKT 2010 07 15 06 24 55 31.3200 -97.3300 251.000 457.0 83.767 2.710 -999.990 -999.990 0.838 ..P WKT 2010 07 15 06 29 55 31.3200 -97.3300 251.000 30.0 91.947 4.080 -999.990 -999.990 0.919 ..P WKT 2010 07 15 06 34 55 31.3200 -97.3300 251.000 122.0 99.019 3.130 -999.990 -999.990 0.990 ..P WKT 2010 07 15 06 39 55 31.3200 -97.3300 251.000 457.0 88.216 2.680 -999.990 -999.990 0.882 ..P WKT 2010 07 15 06 49 55 31.3200 -97.3300 251.000 30.0 83.098 2.200 -999.990 -999.990 0.831 ..P WKT 2010 07 15 06 54 55 31.3200 -97.3300 251.000 122.0 93.496 3.080 -999.990 -999.990 0.935 ..P WKT 2010 07 15 06 59 55 31.3200 -97.3300 251.000 457.0 86.018 3.310 -999.990 -999.990 0.860 ..P WKT 2010 07 15 07 04 55 31.3200 -97.3300 251.000 30.0 91.705 4.060 -999.990 -999.990 0.917 ..P WKT 2010 07 15 07 09 55 31.3200 -97.3300 251.000 122.0 95.590 3.520 -999.990 -999.990 0.956 ..P WKT 2010 07 15 07 14 55 31.3200 -97.3300 251.000 457.0 86.864 3.360 -999.990 -999.990 0.869 ..P WKT 2010 07 15 07 24 55 31.3200 -97.3300 251.000 30.0 89.606 3.740 -999.990 -999.990 0.896 ..P WKT 2010 07 15 07 29 55 31.3200 -97.3300 251.000 122.0 91.234 3.610 -999.990 -999.990 0.912 ..P WKT 2010 07 15 07 34 55 31.3200 -97.3300 251.000 457.0 80.943 4.170 -999.990 -999.990 0.809 ..P WKT 2010 07 15 07 39 55 31.3200 -97.3300 251.000 30.0 87.561 4.610 -999.990 -999.990 0.876 ..P WKT 2010 07 15 07 44 55 31.3200 -97.3300 251.000 122.0 94.318 4.270 -999.990 -999.990 0.943 ..P WKT 2010 07 15 07 49 55 31.3200 -97.3300 251.000 457.0 78.066 2.720 -999.990 -999.990 0.781 ..P WKT 2010 07 15 07 59 55 31.3200 -97.3300 251.000 30.0 94.551 3.230 -999.990 -999.990 0.946 ..P WKT 2010 07 15 08 04 55 31.3200 -97.3300 251.000 122.0 90.695 4.120 -999.990 -999.990 0.907 ..P WKT 2010 07 15 08 09 55 31.3200 -97.3300 251.000 457.0 78.798 5.310 -999.990 -999.990 0.788 ..P WKT 2010 07 15 08 14 55 31.3200 -97.3300 251.000 30.0 83.398 3.550 -999.990 -999.990 0.834 ..P WKT 2010 07 15 08 19 55 31.3200 -97.3300 251.000 122.0 89.938 2.730 -999.990 -999.990 0.899 ..P WKT 2010 07 15 08 24 55 31.3200 -97.3300 251.000 457.0 75.129 2.590 -999.990 -999.990 0.751 ..P WKT 2010 07 15 08 34 55 31.3200 -97.3300 251.000 30.0 90.269 3.880 -999.990 -999.990 0.903 ..P WKT 2010 07 15 08 39 55 31.3200 -97.3300 251.000 122.0 91.383 3.670 -999.990 -999.990 0.914 ..P WKT 2010 07 15 08 44 55 31.3200 -97.3300 251.000 457.0 81.961 3.060 -999.990 -999.990 0.820 ..P WKT 2010 07 15 08 49 55 31.3200 -97.3300 251.000 30.0 83.353 4.040 -999.990 -999.990 0.834 ..P WKT 2010 07 15 08 54 55 31.3200 -97.3300 251.000 122.0 88.348 3.690 -999.990 -999.990 0.883 ..P WKT 2010 07 15 08 59 55 31.3200 -97.3300 251.000 457.0 88.909 2.560 -999.990 -999.990 0.889 ..P WKT 2010 07 15 09 09 55 31.3200 -97.3300 251.000 30.0 86.858 2.430 -999.990 -999.990 0.869 ..P WKT 2010 07 15 09 14 55 31.3200 -97.3300 251.000 122.0 87.022 3.330 -999.990 -999.990 0.870 ..P WKT 2010 07 15 09 19 55 31.3200 -97.3300 251.000 457.0 89.127 3.860 -999.990 -999.990 0.891 ..P WKT 2010 07 15 09 24 55 31.3200 -97.3300 251.000 30.0 98.719 3.940 -999.990 -999.990 0.987 ..P WKT 2010 07 15 09 29 55 31.3200 -97.3300 251.000 122.0 101.101 4.540 -999.990 -999.990 1.011 ..P WKT 2010 07 15 09 34 55 31.3200 -97.3300 251.000 457.0 92.668 3.400 -999.990 -999.990 0.927 ..P WKT 2010 07 15 09 44 55 31.3200 -97.3300 251.000 30.0 89.152 3.900 -999.990 -999.990 0.892 ..P WKT 2010 07 15 09 49 55 31.3200 -97.3300 251.000 122.0 95.179 3.480 -999.990 -999.990 0.952 ..P WKT 2010 07 15 09 54 55 31.3200 -97.3300 251.000 457.0 88.726 4.750 -999.990 -999.990 0.887 ..P WKT 2010 07 15 09 59 55 31.3200 -97.3300 251.000 30.0 90.316 3.980 -999.990 -999.990 0.903 ..P WKT 2010 07 15 10 04 55 31.3200 -97.3300 251.000 122.0 89.410 5.250 -999.990 -999.990 0.894 ..P WKT 2010 07 15 10 09 55 31.3200 -97.3300 251.000 457.0 89.614 3.920 -999.990 -999.990 0.896 ..P WKT 2010 07 15 10 19 55 31.3200 -97.3300 251.000 30.0 94.320 4.840 -999.990 -999.990 0.943 ..P WKT 2010 07 15 10 24 55 31.3200 -97.3300 251.000 122.0 87.450 3.700 -999.990 -999.990 0.875 ..P WKT 2010 07 15 10 29 55 31.3200 -97.3300 251.000 457.0 85.158 3.780 -999.990 -999.990 0.852 ..P WKT 2010 07 15 10 34 55 31.3200 -97.3300 251.000 30.0 95.623 4.720 -999.990 -999.990 0.956 ..P WKT 2010 07 15 10 39 55 31.3200 -97.3300 251.000 122.0 92.499 3.520 -999.990 -999.990 0.925 ..P WKT 2010 07 15 10 44 55 31.3200 -97.3300 251.000 457.0 85.768 3.620 -999.990 -999.990 0.858 ..P WKT 2010 07 15 10 54 55 31.3200 -97.3300 251.000 30.0 86.134 3.620 -999.990 -999.990 0.861 ..P WKT 2010 07 15 10 59 55 31.3200 -97.3300 251.000 122.0 85.605 3.320 -999.990 -999.990 0.856 ..P WKT 2010 07 15 11 04 55 31.3200 -97.3300 251.000 457.0 78.695 5.480 -999.990 -999.990 0.787 ..P WKT 2010 07 15 11 09 55 31.3200 -97.3300 251.000 30.0 89.261 5.800 -999.990 -999.990 0.893 ..P WKT 2010 07 15 11 14 55 31.3200 -97.3300 251.000 122.0 96.359 3.940 -999.990 -999.990 0.964 ..P WKT 2010 07 15 11 19 55 31.3200 -97.3300 251.000 457.0 82.236 4.070 -999.990 -999.990 0.822 ..P WKT 2010 07 15 11 29 55 31.3200 -97.3300 251.000 30.0 95.092 2.760 -999.990 -999.990 0.951 ..P WKT 2010 07 15 11 34 55 31.3200 -97.3300 251.000 122.0 94.885 3.880 -999.990 -999.990 0.949 ..P WKT 2010 07 15 11 39 55 31.3200 -97.3300 251.000 457.0 91.903 3.990 -999.990 -999.990 0.919 ..P WKT 2010 07 15 11 44 55 31.3200 -97.3300 251.000 30.0 92.666 3.800 -999.990 -999.990 0.927 ..P WKT 2010 07 15 11 49 55 31.3200 -97.3300 251.000 122.0 88.852 3.040 -999.990 -999.990 0.889 ..P WKT 2010 07 15 12 09 55 31.3200 -97.3300 251.000 457.0 85.427 3.440 -999.990 -999.990 0.854 ..P WKT 2010 07 15 12 10 25 31.3200 -97.3300 251.000 457.0 85.957 3.380 -999.990 -999.990 0.860 ..P WKT 2010 07 15 12 10 55 31.3200 -97.3300 251.000 457.0 84.823 4.450 -999.990 -999.990 0.848 ..P WKT 2010 07 15 12 11 25 31.3200 -97.3300 251.000 457.0 92.149 3.440 -999.990 -999.990 0.921 ..P WKT 2010 07 15 12 11 55 31.3200 -97.3300 251.000 457.0 90.044 3.340 -999.990 -999.990 0.900 ..P WKT 2010 07 15 12 12 25 31.3200 -97.3300 251.000 457.0 84.469 5.140 -999.990 -999.990 0.845 ..P WKT 2010 07 15 12 12 55 31.3200 -97.3300 251.000 457.0 86.109 4.590 -999.990 -999.990 0.861 ..P WKT 2010 07 15 12 13 25 31.3200 -97.3300 251.000 457.0 84.003 3.710 -999.990 -999.990 0.840 ..P WKT 2010 07 15 12 13 55 31.3200 -97.3300 251.000 457.0 85.365 3.460 -999.990 -999.990 0.854 ..P WKT 2010 07 15 12 14 25 31.3200 -97.3300 251.000 457.0 84.924 3.390 -999.990 -999.990 0.849 ..P WKT 2010 07 15 12 14 55 31.3200 -97.3300 251.000 457.0 86.147 4.540 -999.990 -999.990 0.861 ..P WKT 2010 07 15 12 19 55 31.3200 -97.3300 251.000 30.0 89.503 3.310 -999.990 -999.990 0.895 ..P WKT 2010 07 15 12 24 55 31.3200 -97.3300 251.000 122.0 84.396 2.990 -999.990 -999.990 0.844 ..P WKT 2010 07 15 12 29 55 31.3200 -97.3300 251.000 457.0 82.757 3.580 -999.990 -999.990 0.828 ..P WKT 2010 07 15 12 34 55 31.3200 -97.3300 251.000 30.0 90.276 2.980 -999.990 -999.990 0.903 ..P WKT 2010 07 15 12 39 55 31.3200 -97.3300 251.000 122.0 89.469 2.820 -999.990 -999.990 0.895 ..P WKT 2010 07 15 12 44 55 31.3200 -97.3300 251.000 457.0 84.500 3.300 -999.990 -999.990 0.845 ..P WKT 2010 07 15 12 54 55 31.3200 -97.3300 251.000 30.0 83.704 4.230 -999.990 -999.990 0.837 ..P WKT 2010 07 15 12 59 55 31.3200 -97.3300 251.000 122.0 84.547 2.640 -999.990 -999.990 0.845 ..P WKT 2010 07 15 13 04 55 31.3200 -97.3300 251.000 457.0 78.451 3.300 -999.990 -999.990 0.785 ..P WKT 2010 07 15 13 09 55 31.3200 -97.3300 251.000 30.0 84.568 3.460 -999.990 -999.990 0.846 ..P WKT 2010 07 15 13 14 55 31.3200 -97.3300 251.000 122.0 86.244 3.990 -999.990 -999.990 0.862 ..P WKT 2010 07 15 13 19 55 31.3200 -97.3300 251.000 457.0 83.757 2.490 -999.990 -999.990 0.838 ..P WKT 2010 07 15 13 29 55 31.3200 -97.3300 251.000 30.0 85.642 2.840 -999.990 -999.990 0.856 ..P WKT 2010 07 15 13 34 55 31.3200 -97.3300 251.000 122.0 99.176 3.120 -999.990 -999.990 0.992 ..P WKT 2010 07 15 13 39 55 31.3200 -97.3300 251.000 457.0 88.836 2.660 -999.990 -999.990 0.888 ..P WKT 2010 07 15 13 44 55 31.3200 -97.3300 251.000 30.0 95.153 4.560 -999.990 -999.990 0.952 ..P WKT 2010 07 15 13 49 55 31.3200 -97.3300 251.000 122.0 96.473 3.340 -999.990 -999.990 0.965 ..P WKT 2010 07 15 13 54 55 31.3200 -97.3300 251.000 457.0 81.411 2.970 -999.990 -999.990 0.814 ..P WKT 2010 07 15 14 04 55 31.3200 -97.3300 251.000 30.0 95.693 3.650 -999.990 -999.990 0.957 ..P WKT 2010 07 15 14 09 55 31.3200 -97.3300 251.000 122.0 95.327 3.210 -999.990 -999.990 0.953 ..P WKT 2010 07 15 14 14 55 31.3200 -97.3300 251.000 457.0 84.409 4.570 -999.990 -999.990 0.844 ..P WKT 2010 07 15 14 19 55 31.3200 -97.3300 251.000 30.0 99.317 3.940 -999.990 -999.990 0.993 ..P WKT 2010 07 15 14 24 55 31.3200 -97.3300 251.000 122.0 103.811 4.510 -999.990 -999.990 1.038 ..P WKT 2010 07 15 14 29 55 31.3200 -97.3300 251.000 457.0 100.807 4.370 -999.990 -999.990 1.008 ..P WKT 2010 07 15 14 39 55 31.3200 -97.3300 251.000 30.0 103.905 4.300 -999.990 -999.990 1.039 ..P WKT 2010 07 15 14 44 55 31.3200 -97.3300 251.000 122.0 93.480 3.920 -999.990 -999.990 0.935 ..P WKT 2010 07 15 14 49 55 31.3200 -97.3300 251.000 457.0 91.804 3.910 -999.990 -999.990 0.918 ..P WKT 2010 07 15 14 54 55 31.3200 -97.3300 251.000 30.0 87.906 4.010 -999.990 -999.990 0.879 ..P WKT 2010 07 15 14 59 55 31.3200 -97.3300 251.000 122.0 93.176 3.190 -999.990 -999.990 0.932 ..P WKT 2010 07 15 15 04 55 31.3200 -97.3300 251.000 457.0 80.249 3.760 -999.990 -999.990 0.802 ..P WKT 2010 07 15 15 14 55 31.3200 -97.3300 251.000 30.0 87.335 3.190 -999.990 -999.990 0.873 ..P WKT 2010 07 15 15 19 55 31.3200 -97.3300 251.000 122.0 95.403 3.100 -999.990 -999.990 0.954 ..P WKT 2010 07 15 15 24 55 31.3200 -97.3300 251.000 457.0 91.663 3.980 -999.990 -999.990 0.917 ..P WKT 2010 07 15 15 29 55 31.3200 -97.3300 251.000 30.0 90.562 4.440 -999.990 -999.990 0.906 ..P WKT 2010 07 15 15 34 55 31.3200 -97.3300 251.000 122.0 99.326 4.380 -999.990 -999.990 0.993 ..P WKT 2010 07 15 15 39 55 31.3200 -97.3300 251.000 457.0 93.779 2.830 -999.990 -999.990 0.938 ..P WKT 2010 07 15 15 49 55 31.3200 -97.3300 251.000 30.0 97.434 3.690 -999.990 -999.990 0.974 ..P WKT 2010 07 15 15 54 55 31.3200 -97.3300 251.000 122.0 102.468 4.450 -999.990 -999.990 1.025 ..P WKT 2010 07 15 15 59 55 31.3200 -97.3300 251.000 457.0 99.581 5.720 -999.990 -999.990 0.996 ..P WKT 2010 07 15 16 04 55 31.3200 -97.3300 251.000 30.0 95.443 7.220 -999.990 -999.990 0.954 ..P WKT 2010 07 15 16 09 55 31.3200 -97.3300 251.000 122.0 103.256 6.250 -999.990 -999.990 1.033 ..P WKT 2010 07 15 16 14 55 31.3200 -97.3300 251.000 457.0 98.424 4.010 -999.990 -999.990 0.984 ..P WKT 2010 07 15 16 24 55 31.3200 -97.3300 251.000 30.0 94.593 4.200 -999.990 -999.990 0.946 ..P WKT 2010 07 15 16 29 55 31.3200 -97.3300 251.000 122.0 97.822 6.210 -999.990 -999.990 0.978 ..P WKT 2010 07 15 16 34 55 31.3200 -97.3300 251.000 457.0 94.377 7.090 -999.990 -999.990 0.944 ..P WKT 2010 07 15 16 39 55 31.3200 -97.3300 251.000 30.0 95.381 5.500 -999.990 -999.990 0.954 ..P WKT 2010 07 15 16 44 55 31.3200 -97.3300 251.000 122.0 93.327 4.210 -999.990 -999.990 0.933 ..P WKT 2010 07 15 16 49 55 31.3200 -97.3300 251.000 457.0 90.994 3.700 -999.990 -999.990 0.910 ..P WKT 2010 07 15 17 04 55 31.3200 -97.3300 251.000 30.0 90.977 3.220 -999.990 -999.990 0.910 ..P WKT 2010 07 15 17 09 55 31.3200 -97.3300 251.000 122.0 101.590 3.220 -999.990 -999.990 1.016 ..P WKT 2010 07 15 17 14 55 31.3200 -97.3300 251.000 457.0 89.956 4.060 -999.990 -999.990 0.900 ..P WKT 2010 07 15 17 19 55 31.3200 -97.3300 251.000 30.0 94.452 3.540 -999.990 -999.990 0.945 ..P WKT 2010 07 15 17 24 55 31.3200 -97.3300 251.000 122.0 101.451 3.130 -999.990 -999.990 1.015 ..P WKT 2010 07 15 17 29 55 31.3200 -97.3300 251.000 457.0 95.656 4.310 -999.990 -999.990 0.957 ..P WKT 2010 07 15 17 39 55 31.3200 -97.3300 251.000 30.0 96.070 3.030 -999.990 -999.990 0.961 ..P WKT 2010 07 15 17 44 55 31.3200 -97.3300 251.000 122.0 105.062 3.280 -999.990 -999.990 1.051 ..P WKT 2010 07 15 17 49 55 31.3200 -97.3300 251.000 457.0 99.590 3.600 -999.990 -999.990 0.996 ..P WKT 2010 07 15 17 54 55 31.3200 -97.3300 251.000 30.0 100.236 3.600 -999.990 -999.990 1.002 ..P WKT 2010 07 15 17 59 55 31.3200 -97.3300 251.000 122.0 108.672 3.060 -999.990 -999.990 1.087 ..P WKT 2010 07 15 18 04 55 31.3200 -97.3300 251.000 457.0 100.974 3.150 -999.990 -999.990 1.010 ..P WKT 2010 07 15 18 14 55 31.3200 -97.3300 251.000 30.0 95.492 4.090 -999.990 -999.990 0.955 ..P WKT 2010 07 15 18 19 55 31.3200 -97.3300 251.000 122.0 105.360 3.530 -999.990 -999.990 1.054 ..P WKT 2010 07 15 18 24 55 31.3200 -97.3300 251.000 457.0 93.944 4.190 -999.990 -999.990 0.939 ..P WKT 2010 07 15 18 29 55 31.3200 -97.3300 251.000 30.0 98.109 2.770 -999.990 -999.990 0.981 ..P WKT 2010 07 15 18 34 55 31.3200 -97.3300 251.000 122.0 97.822 2.990 -999.990 -999.990 0.978 ..P WKT 2010 07 15 18 39 55 31.3200 -97.3300 251.000 457.0 92.665 3.600 -999.990 -999.990 0.927 ..P WKT 2010 07 15 18 49 55 31.3200 -97.3300 251.000 30.0 93.761 2.940 -999.990 -999.990 0.938 ..P WKT 2010 07 15 18 54 55 31.3200 -97.3300 251.000 122.0 101.266 2.920 -999.990 -999.990 1.013 ..P WKT 2010 07 15 18 59 55 31.3200 -97.3300 251.000 457.0 94.856 2.670 -999.990 -999.990 0.949 ..P WKT 2010 07 15 19 04 55 31.3200 -97.3300 251.000 30.0 94.708 3.900 -999.990 -999.990 0.947 ..P WKT 2010 07 15 19 09 55 31.3200 -97.3300 251.000 122.0 104.859 3.490 -999.990 -999.990 1.049 ..P WKT 2010 07 15 19 14 55 31.3200 -97.3300 251.000 457.0 92.186 4.100 -999.990 -999.990 0.922 ..P WKT 2010 07 15 19 24 55 31.3200 -97.3300 251.000 30.0 103.303 3.370 -999.990 -999.990 1.033 ..P WKT 2010 07 15 19 29 55 31.3200 -97.3300 251.000 122.0 104.268 3.160 -999.990 -999.990 1.043 ..P WKT 2010 07 15 19 34 55 31.3200 -97.3300 251.000 457.0 93.959 2.930 -999.990 -999.990 0.940 ..P WKT 2010 07 15 19 39 55 31.3200 -97.3300 251.000 30.0 94.507 3.640 -999.990 -999.990 0.945 ..P WKT 2010 07 15 19 44 55 31.3200 -97.3300 251.000 122.0 102.712 2.950 -999.990 -999.990 1.027 ..P WKT 2010 07 15 19 49 55 31.3200 -97.3300 251.000 457.0 96.856 4.440 -999.990 -999.990 0.969 ..P WKT 2010 07 15 19 59 55 31.3200 -97.3300 251.000 30.0 104.436 3.970 -999.990 -999.990 1.044 ..P WKT 2010 07 15 20 04 55 31.3200 -97.3300 251.000 122.0 110.772 3.720 -999.990 -999.990 1.108 ..P WKT 2010 07 15 20 09 55 31.3200 -97.3300 251.000 457.0 100.541 4.250 -999.990 -999.990 1.005 ..P WKT 2010 07 15 20 14 55 31.3200 -97.3300 251.000 30.0 107.017 5.210 -999.990 -999.990 1.070 ..P WKT 2010 07 15 20 19 55 31.3200 -97.3300 251.000 122.0 110.430 3.510 -999.990 -999.990 1.104 ..P WKT 2010 07 15 20 24 55 31.3200 -97.3300 251.000 457.0 110.780 4.290 -999.990 -999.990 1.108 ..P WKT 2010 07 15 20 34 55 31.3200 -97.3300 251.000 30.0 104.059 3.770 -999.990 -999.990 1.041 ..P WKT 2010 07 15 20 39 55 31.3200 -97.3300 251.000 122.0 112.585 3.630 -999.990 -999.990 1.126 ..P WKT 2010 07 15 20 44 55 31.3200 -97.3300 251.000 457.0 94.650 3.150 -999.990 -999.990 0.947 ..P WKT 2010 07 15 20 49 55 31.3200 -97.3300 251.000 30.0 101.228 3.110 -999.990 -999.990 1.012 ..P WKT 2010 07 15 20 54 55 31.3200 -97.3300 251.000 122.0 112.541 2.630 -999.990 -999.990 1.125 ..P WKT 2010 07 15 20 59 55 31.3200 -97.3300 251.000 457.0 106.305 2.770 -999.990 -999.990 1.063 ..P WKT 2010 07 15 21 09 55 31.3200 -97.3300 251.000 30.0 113.771 2.490 -999.990 -999.990 1.138 ..P WKT 2010 07 15 21 14 55 31.3200 -97.3300 251.000 122.0 110.758 3.320 -999.990 -999.990 1.108 ..P WKT 2010 07 15 21 19 55 31.3200 -97.3300 251.000 457.0 107.744 4.270 -999.990 -999.990 1.077 ..P WKT 2010 07 15 21 24 55 31.3200 -97.3300 251.000 30.0 103.059 3.660 -999.990 -999.990 1.031 ..P WKT 2010 07 15 21 29 55 31.3200 -97.3300 251.000 122.0 112.862 2.970 -999.990 -999.990 1.129 ..P WKT 2010 07 15 21 34 55 31.3200 -97.3300 251.000 457.0 104.833 3.970 -999.990 -999.990 1.048 ..P WKT 2010 07 15 21 44 55 31.3200 -97.3300 251.000 30.0 107.364 3.560 -999.990 -999.990 1.074 ..P WKT 2010 07 15 21 49 55 31.3200 -97.3300 251.000 122.0 113.467 3.900 -999.990 -999.990 1.135 ..P WKT 2010 07 15 21 54 55 31.3200 -97.3300 251.000 457.0 107.308 3.140 -999.990 -999.990 1.073 ..P WKT 2010 07 15 21 59 55 31.3200 -97.3300 251.000 30.0 103.935 3.170 -999.990 -999.990 1.039 ..P WKT 2010 07 15 22 04 55 31.3200 -97.3300 251.000 122.0 112.546 3.880 -999.990 -999.990 1.125 ..P WKT 2010 07 15 22 09 55 31.3200 -97.3300 251.000 457.0 95.237 5.320 -999.990 -999.990 0.952 ..P WKT 2010 07 15 22 19 55 31.3200 -97.3300 251.000 30.0 98.226 2.840 -999.990 -999.990 0.982 ..P WKT 2010 07 15 22 24 55 31.3200 -97.3300 251.000 122.0 97.062 2.870 -999.990 -999.990 0.971 ..P WKT 2010 07 15 22 29 55 31.3200 -97.3300 251.000 457.0 91.160 2.950 -999.990 -999.990 0.912 ..P WKT 2010 07 15 22 34 55 31.3200 -97.3300 251.000 30.0 103.516 3.210 -999.990 -999.990 1.035 ..P WKT 2010 07 15 22 39 55 31.3200 -97.3300 251.000 122.0 100.262 3.010 -999.990 -999.990 1.003 ..P WKT 2010 07 15 22 44 55 31.3200 -97.3300 251.000 457.0 96.171 4.300 -999.990 -999.990 0.962 ..P WKT 2010 07 15 22 54 55 31.3200 -97.3300 251.000 30.0 95.636 4.300 -999.990 -999.990 0.956 ..P WKT 2010 07 15 22 59 55 31.3200 -97.3300 251.000 122.0 93.615 3.610 -999.990 -999.990 0.936 ..P WKT 2010 07 15 23 04 55 31.3200 -97.3300 251.000 457.0 85.879 3.280 -999.990 -999.990 0.859 ..P WKT 2010 07 15 23 09 55 31.3200 -97.3300 251.000 30.0 92.223 4.820 -999.990 -999.990 0.922 ..P WKT 2010 07 15 23 14 55 31.3200 -97.3300 251.000 122.0 97.174 4.260 -999.990 -999.990 0.972 ..P WKT 2010 07 15 23 19 55 31.3200 -97.3300 251.000 457.0 84.277 3.650 -999.990 -999.990 0.843 ..P WKT 2010 07 15 23 29 55 31.3200 -97.3300 251.000 30.0 84.655 4.490 -999.990 -999.990 0.847 ..P WKT 2010 07 15 23 34 55 31.3200 -97.3300 251.000 122.0 94.723 3.630 -999.990 -999.990 0.947 ..P WKT 2010 07 15 23 39 55 31.3200 -97.3300 251.000 457.0 79.969 3.110 -999.990 -999.990 0.800 ..P WKT 2010 07 15 23 44 55 31.3200 -97.3300 251.000 30.0 92.689 2.530 -999.990 -999.990 0.927 ..P WKT 2010 07 15 23 49 55 31.3200 -97.3300 251.000 122.0 95.507 2.470 -999.990 -999.990 0.955 ..P WKT 2010 07 16 00 09 55 31.3200 -97.3300 251.000 457.0 89.420 3.600 -999.990 -999.990 0.894 ..P WKT 2010 07 16 00 10 25 31.3200 -97.3300 251.000 457.0 85.820 2.640 -999.990 -999.990 0.858 ..P WKT 2010 07 16 00 10 55 31.3200 -97.3300 251.000 457.0 83.615 5.090 -999.990 -999.990 0.836 ..P WKT 2010 07 16 00 11 25 31.3200 -97.3300 251.000 457.0 86.710 2.820 -999.990 -999.990 0.867 ..P WKT 2010 07 16 00 11 55 31.3200 -97.3300 251.000 457.0 89.526 1.820 -999.990 -999.990 0.895 ..P WKT 2010 07 16 00 12 25 31.3200 -97.3300 251.000 457.0 87.041 2.280 -999.990 -999.990 0.870 ..P WKT 2010 07 16 00 12 55 31.3200 -97.3300 251.000 457.0 88.463 2.140 -999.990 -999.990 0.885 ..P WKT 2010 07 16 00 13 25 31.3200 -97.3300 251.000 457.0 90.441 3.660 -999.990 -999.990 0.904 ..P WKT 2010 07 16 00 13 55 31.3200 -97.3300 251.000 457.0 91.583 3.940 -999.990 -999.990 0.916 ..P WKT 2010 07 16 00 14 25 31.3200 -97.3300 251.000 457.0 86.868 3.230 -999.990 -999.990 0.869 ..P WKT 2010 07 16 00 14 55 31.3200 -97.3300 251.000 457.0 88.010 2.080 -999.990 -999.990 0.880 ..P WKT 2010 07 16 00 19 55 31.3200 -97.3300 251.000 30.0 89.389 2.620 -999.990 -999.990 0.894 ..P WKT 2010 07 16 00 24 55 31.3200 -97.3300 251.000 122.0 94.394 3.330 -999.990 -999.990 0.944 ..P WKT 2010 07 16 00 29 55 31.3200 -97.3300 251.000 457.0 86.289 3.890 -999.990 -999.990 0.863 ..P WKT 2010 07 16 00 34 55 31.3200 -97.3300 251.000 30.0 87.668 2.220 -999.990 -999.990 0.877 ..P WKT 2010 07 16 00 39 55 31.3200 -97.3300 251.000 122.0 102.995 3.290 -999.990 -999.990 1.030 ..P WKT 2010 07 16 00 44 55 31.3200 -97.3300 251.000 457.0 92.100 3.360 -999.990 -999.990 0.921 ..P WKT 2010 07 16 00 54 55 31.3200 -97.3300 251.000 30.0 85.349 2.270 -999.990 -999.990 0.853 ..P WKT 2010 07 16 00 59 55 31.3200 -97.3300 251.000 122.0 97.025 2.240 -999.990 -999.990 0.970 ..P WKT 2010 07 16 01 04 55 31.3200 -97.3300 251.000 457.0 91.406 2.410 -999.990 -999.990 0.914 ..P WKT 2010 07 16 01 09 55 31.3200 -97.3300 251.000 30.0 80.487 2.600 -999.990 -999.990 0.805 ..P WKT 2010 07 16 01 14 55 31.3200 -97.3300 251.000 122.0 101.647 3.130 -999.990 -999.990 1.016 ..P WKT 2010 07 16 01 19 55 31.3200 -97.3300 251.000 457.0 91.844 3.220 -999.990 -999.990 0.918 ..P WKT 2010 07 16 01 29 55 31.3200 -97.3300 251.000 30.0 92.641 2.960 -999.990 -999.990 0.926 ..P WKT 2010 07 16 01 34 55 31.3200 -97.3300 251.000 122.0 99.892 2.320 -999.990 -999.990 0.999 ..P WKT 2010 07 16 01 39 55 31.3200 -97.3300 251.000 457.0 89.014 3.500 -999.990 -999.990 0.890 ..P WKT 2010 07 16 01 44 55 31.3200 -97.3300 251.000 30.0 97.382 3.550 -999.990 -999.990 0.974 ..P WKT 2010 07 16 01 49 55 31.3200 -97.3300 251.000 122.0 99.892 3.450 -999.990 -999.990 0.999 ..P WKT 2010 07 16 01 54 55 31.3200 -97.3300 251.000 457.0 87.618 2.410 -999.990 -999.990 0.876 ..P WKT 2010 07 16 02 04 55 31.3200 -97.3300 251.000 30.0 111.885 2.400 -999.990 -999.990 1.119 ..P WKT 2010 07 16 02 09 55 31.3200 -97.3300 251.000 122.0 104.773 2.940 -999.990 -999.990 1.048 ..P WKT 2010 07 16 02 14 55 31.3200 -97.3300 251.000 457.0 88.873 2.890 -999.990 -999.990 0.889 ..P WKT 2010 07 16 02 19 55 31.3200 -97.3300 251.000 30.0 108.258 3.420 -999.990 -999.990 1.083 ..P WKT 2010 07 16 02 24 55 31.3200 -97.3300 251.000 122.0 108.258 3.610 -999.990 -999.990 1.083 ..P WKT 2010 07 16 02 29 55 31.3200 -97.3300 251.000 457.0 95.567 3.660 -999.990 -999.990 0.956 ..P WKT 2010 07 16 02 39 55 31.3200 -97.3300 251.000 30.0 105.926 3.790 -999.990 -999.990 1.059 ..P WKT 2010 07 16 02 44 55 31.3200 -97.3300 251.000 122.0 113.497 3.830 -999.990 -999.990 1.135 ..P WKT 2010 07 16 02 49 55 31.3200 -97.3300 251.000 457.0 96.104 4.140 -999.990 -999.990 0.961 ..P WKT 2010 07 16 02 54 55 31.3200 -97.3300 251.000 30.0 116.365 6.730 -999.990 -999.990 1.164 ..P WKT 2010 07 16 02 59 55 31.3200 -97.3300 251.000 122.0 104.969 3.500 -999.990 -999.990 1.050 ..P WKT 2010 07 16 03 04 55 31.3200 -97.3300 251.000 457.0 93.434 3.650 -999.990 -999.990 0.934 ..P WKT 2010 07 16 03 14 55 31.3200 -97.3300 251.000 30.0 107.299 4.510 -999.990 -999.990 1.073 ..P WKT 2010 07 16 03 19 55 31.3200 -97.3300 251.000 122.0 112.060 2.960 -999.990 -999.990 1.121 ..P WKT 2010 07 16 03 24 55 31.3200 -97.3300 251.000 457.0 98.134 2.750 -999.990 -999.990 0.981 ..P WKT 2010 07 16 03 29 55 31.3200 -97.3300 251.000 30.0 116.005 4.130 -999.990 -999.990 1.160 ..P WKT 2010 07 16 03 34 55 31.3200 -97.3300 251.000 122.0 105.286 3.490 -999.990 -999.990 1.053 ..P WKT 2010 07 16 03 39 55 31.3200 -97.3300 251.000 457.0 91.780 3.790 -999.990 -999.990 0.918 ..P WKT 2010 07 16 03 49 55 31.3200 -97.3300 251.000 30.0 105.823 2.590 -999.990 -999.990 1.058 ..P WKT 2010 07 16 03 54 55 31.3200 -97.3300 251.000 122.0 99.348 2.680 -999.990 -999.990 0.993 ..P WKT 2010 07 16 03 59 55 31.3200 -97.3300 251.000 457.0 89.248 3.720 -999.990 -999.990 0.892 ..P WKT 2010 07 16 04 04 55 31.3200 -97.3300 251.000 30.0 113.173 4.000 -999.990 -999.990 1.132 ..P WKT 2010 07 16 04 09 55 31.3200 -97.3300 251.000 122.0 94.428 3.570 -999.990 -999.990 0.944 ..P WKT 2010 07 16 04 14 55 31.3200 -97.3300 251.000 457.0 90.045 2.240 -999.990 -999.990 0.900 ..P WKT 2010 07 16 04 24 55 31.3200 -97.3300 251.000 30.0 116.420 2.490 -999.990 -999.990 1.164 ..P WKT 2010 07 16 04 29 55 31.3200 -97.3300 251.000 122.0 98.092 3.090 -999.990 -999.990 0.981 ..P WKT 2010 07 16 04 34 55 31.3200 -97.3300 251.000 457.0 89.805 3.680 -999.990 -999.990 0.898 ..P WKT 2010 07 16 04 39 55 31.3200 -97.3300 251.000 30.0 118.888 4.890 -999.990 -999.990 1.189 ..P WKT 2010 07 16 04 44 55 31.3200 -97.3300 251.000 122.0 101.956 4.220 -999.990 -999.990 1.020 ..P WKT 2010 07 16 04 49 55 31.3200 -97.3300 251.000 457.0 99.525 4.410 -999.990 -999.990 0.995 ..P WKT 2010 07 16 05 04 55 31.3200 -97.3300 251.000 30.0 112.363 3.980 -999.990 -999.990 1.124 ..P WKT 2010 07 16 05 09 55 31.3200 -97.3300 251.000 122.0 101.452 4.930 -999.990 -999.990 1.015 ..P WKT 2010 07 16 05 14 55 31.3200 -97.3300 251.000 457.0 93.051 4.920 -999.990 -999.990 0.931 ..P WKT 2010 07 16 05 19 55 31.3200 -97.3300 251.000 30.0 107.517 4.230 -999.990 -999.990 1.075 ..P WKT 2010 07 16 05 24 55 31.3200 -97.3300 251.000 122.0 93.538 4.000 -999.990 -999.990 0.935 ..P WKT 2010 07 16 05 29 55 31.3200 -97.3300 251.000 457.0 86.810 2.480 -999.990 -999.990 0.868 ..P WKT 2010 07 16 05 39 55 31.3200 -97.3300 251.000 30.0 114.263 4.930 -999.990 -999.990 1.143 ..P WKT 2010 07 16 05 44 55 31.3200 -97.3300 251.000 122.0 90.161 3.810 -999.990 -999.990 0.902 ..P WKT 2010 07 16 05 49 55 31.3200 -97.3300 251.000 457.0 93.388 4.330 -999.990 -999.990 0.934 ..P WKT 2010 07 16 05 54 55 31.3200 -97.3300 251.000 30.0 102.471 4.050 -999.990 -999.990 1.025 ..P WKT 2010 07 16 05 59 55 31.3200 -97.3300 251.000 122.0 91.754 2.890 -999.990 -999.990 0.918 ..P WKT 2010 07 16 06 04 55 31.3200 -97.3300 251.000 457.0 92.889 2.260 -999.990 -999.990 0.929 ..P WKT 2010 07 16 06 14 55 31.3200 -97.3300 251.000 30.0 113.584 3.050 -999.990 -999.990 1.136 ..P WKT 2010 07 16 06 19 55 31.3200 -97.3300 251.000 122.0 94.940 3.680 -999.990 -999.990 0.949 ..P WKT 2010 07 16 06 24 55 31.3200 -97.3300 251.000 457.0 92.610 3.500 -999.990 -999.990 0.926 ..P WKT 2010 07 16 06 29 55 31.3200 -97.3300 251.000 30.0 110.496 3.750 -999.990 -999.990 1.105 ..P WKT 2010 07 16 06 34 55 31.3200 -97.3300 251.000 122.0 108.165 2.780 -999.990 -999.990 1.082 ..P WKT 2010 07 16 06 39 55 31.3200 -97.3300 251.000 457.0 97.190 3.620 -999.990 -999.990 0.972 ..P WKT 2010 07 16 06 49 55 31.3200 -97.3300 251.000 30.0 105.993 3.690 -999.990 -999.990 1.060 ..P WKT 2010 07 16 06 54 55 31.3200 -97.3300 251.000 122.0 102.069 2.750 -999.990 -999.990 1.021 ..P WKT 2010 07 16 06 59 55 31.3200 -97.3300 251.000 457.0 90.616 2.670 -999.990 -999.990 0.906 ..P WKT 2010 07 16 07 04 55 31.3200 -97.3300 251.000 30.0 102.586 4.440 -999.990 -999.990 1.026 ..P WKT 2010 07 16 07 09 55 31.3200 -97.3300 251.000 122.0 112.464 3.310 -999.990 -999.990 1.125 ..P WKT 2010 07 16 07 14 55 31.3200 -97.3300 251.000 457.0 93.345 3.690 -999.990 -999.990 0.933 ..P WKT 2010 07 16 07 24 55 31.3200 -97.3300 251.000 30.0 108.839 4.030 -999.990 -999.990 1.088 ..P WKT 2010 07 16 07 29 55 31.3200 -97.3300 251.000 122.0 116.825 3.830 -999.990 -999.990 1.168 ..P WKT 2010 07 16 07 34 55 31.3200 -97.3300 251.000 457.0 104.735 3.750 -999.990 -999.990 1.047 ..P WKT 2010 07 16 07 39 55 31.3200 -97.3300 251.000 30.0 118.019 6.660 -999.990 -999.990 1.180 ..P WKT 2010 07 16 07 44 55 31.3200 -97.3300 251.000 122.0 111.646 3.230 -999.990 -999.990 1.116 ..P WKT 2010 07 16 07 49 55 31.3200 -97.3300 251.000 457.0 94.120 3.450 -999.990 -999.990 0.941 ..P WKT 2010 07 16 07 59 55 31.3200 -97.3300 251.000 30.0 107.244 3.130 -999.990 -999.990 1.072 ..P WKT 2010 07 16 08 04 55 31.3200 -97.3300 251.000 122.0 114.194 2.610 -999.990 -999.990 1.142 ..P WKT 2010 07 16 08 09 55 31.3200 -97.3300 251.000 457.0 98.560 3.380 -999.990 -999.990 0.986 ..P WKT 2010 07 16 08 14 55 31.3200 -97.3300 251.000 30.0 109.135 2.830 -999.990 -999.990 1.091 ..P WKT 2010 07 16 08 19 55 31.3200 -97.3300 251.000 122.0 124.449 2.340 -999.990 -999.990 1.244 ..P WKT 2010 07 16 08 24 55 31.3200 -97.3300 251.000 457.0 101.567 2.650 -999.990 -999.990 1.016 ..P WKT 2010 07 16 08 34 55 31.3200 -97.3300 251.000 30.0 113.137 2.120 -999.990 -999.990 1.131 ..P WKT 2010 07 16 08 39 55 31.3200 -97.3300 251.000 122.0 132.812 2.800 -999.990 -999.990 1.328 ..P WKT 2010 07 16 08 44 55 31.3200 -97.3300 251.000 457.0 105.648 3.170 -999.990 -999.990 1.056 ..P WKT 2010 07 16 08 49 55 31.3200 -97.3300 251.000 30.0 111.383 2.660 -999.990 -999.990 1.114 ..P WKT 2010 07 16 08 54 55 31.3200 -97.3300 251.000 122.0 121.301 2.710 -999.990 -999.990 1.213 ..P WKT 2010 07 16 08 59 55 31.3200 -97.3300 251.000 457.0 91.349 1.990 -999.990 -999.990 0.913 ..P WKT 2010 07 16 09 09 55 31.3200 -97.3300 251.000 30.0 110.705 2.930 -999.990 -999.990 1.107 ..P WKT 2010 07 16 09 14 55 31.3200 -97.3300 251.000 122.0 114.010 3.780 -999.990 -999.990 1.140 ..P WKT 2010 07 16 09 19 55 31.3200 -97.3300 251.000 457.0 101.146 2.160 -999.990 -999.990 1.011 ..P WKT 2010 07 16 09 24 55 31.3200 -97.3300 251.000 30.0 118.391 2.620 -999.990 -999.990 1.184 ..P WKT 2010 07 16 09 29 55 31.3200 -97.3300 251.000 122.0 118.630 3.240 -999.990 -999.990 1.186 ..P WKT 2010 07 16 09 34 55 31.3200 -97.3300 251.000 457.0 95.728 3.400 -999.990 -999.990 0.957 ..P WKT 2010 07 16 09 44 55 31.3200 -97.3300 251.000 30.0 118.251 3.580 -999.990 -999.990 1.183 ..P WKT 2010 07 16 09 49 55 31.3200 -97.3300 251.000 122.0 114.606 2.540 -999.990 -999.990 1.146 ..P WKT 2010 07 16 09 54 55 31.3200 -97.3300 251.000 457.0 102.319 3.360 -999.990 -999.990 1.023 ..P WKT 2010 07 16 09 59 55 31.3200 -97.3300 251.000 30.0 109.269 3.010 -999.990 -999.990 1.093 ..P WKT 2010 07 16 10 04 55 31.3200 -97.3300 251.000 122.0 109.945 3.270 -999.990 -999.990 1.099 ..P WKT 2010 07 16 10 09 55 31.3200 -97.3300 251.000 457.0 101.283 2.940 -999.990 -999.990 1.013 ..P WKT 2010 07 16 10 19 55 31.3200 -97.3300 251.000 30.0 115.640 2.960 -999.990 -999.990 1.156 ..P WKT 2010 07 16 10 24 55 31.3200 -97.3300 251.000 122.0 103.254 4.730 -999.990 -999.990 1.033 ..P WKT 2010 07 16 10 29 55 31.3200 -97.3300 251.000 457.0 107.873 2.990 -999.990 -999.990 1.079 ..P WKT 2010 07 16 10 34 55 31.3200 -97.3300 251.000 30.0 110.680 3.730 -999.990 -999.990 1.107 ..P WKT 2010 07 16 10 39 55 31.3200 -97.3300 251.000 122.0 98.853 3.440 -999.990 -999.990 0.989 ..P WKT 2010 07 16 10 44 55 31.3200 -97.3300 251.000 457.0 103.472 2.820 -999.990 -999.990 1.035 ..P WKT 2010 07 16 10 54 55 31.3200 -97.3300 251.000 30.0 109.465 3.380 -999.990 -999.990 1.095 ..P WKT 2010 07 16 10 59 55 31.3200 -97.3300 251.000 122.0 99.409 3.480 -999.990 -999.990 0.994 ..P WKT 2010 07 16 11 04 55 31.3200 -97.3300 251.000 457.0 87.959 3.090 -999.990 -999.990 0.880 ..P WKT 2010 07 16 11 09 55 31.3200 -97.3300 251.000 30.0 105.223 5.270 -999.990 -999.990 1.052 ..P WKT 2010 07 16 11 14 55 31.3200 -97.3300 251.000 122.0 102.833 3.430 -999.990 -999.990 1.028 ..P WKT 2010 07 16 11 19 55 31.3200 -97.3300 251.000 457.0 91.662 4.610 -999.990 -999.990 0.917 ..P WKT 2010 07 16 11 29 55 31.3200 -97.3300 251.000 30.0 110.214 4.360 -999.990 -999.990 1.102 ..P WKT 2010 07 16 11 34 55 31.3200 -97.3300 251.000 122.0 102.165 3.460 -999.990 -999.990 1.022 ..P WKT 2010 07 16 11 39 55 31.3200 -97.3300 251.000 457.0 94.534 3.670 -999.990 -999.990 0.945 ..P WKT 2010 07 16 11 44 55 31.3200 -97.3300 251.000 30.0 111.014 3.120 -999.990 -999.990 1.110 ..P WKT 2010 07 16 11 49 55 31.3200 -97.3300 251.000 122.0 104.220 3.190 -999.990 -999.990 1.042 ..P WKT 2010 07 16 12 09 55 31.3200 -97.3300 251.000 457.0 98.878 3.320 -999.990 -999.990 0.989 ..P WKT 2010 07 16 12 10 25 31.3200 -97.3300 251.000 457.0 98.053 4.520 -999.990 -999.990 0.981 ..P WKT 2010 07 16 12 10 55 31.3200 -97.3300 251.000 457.0 93.325 3.720 -999.990 -999.990 0.933 ..P WKT 2010 07 16 12 11 25 31.3200 -97.3300 251.000 457.0 94.729 2.720 -999.990 -999.990 0.947 ..P WKT 2010 07 16 12 11 55 31.3200 -97.3300 251.000 457.0 99.479 3.120 -999.990 -999.990 0.995 ..P WKT 2010 07 16 12 12 25 31.3200 -97.3300 251.000 457.0 101.441 2.600 -999.990 -999.990 1.014 ..P WKT 2010 07 16 12 12 55 31.3200 -97.3300 251.000 457.0 105.076 2.960 -999.990 -999.990 1.051 ..P WKT 2010 07 16 12 13 25 31.3200 -97.3300 251.000 457.0 106.202 2.620 -999.990 -999.990 1.062 ..P WKT 2010 07 16 12 13 55 31.3200 -97.3300 251.000 457.0 109.837 3.150 -999.990 -999.990 1.098 ..P WKT 2010 07 16 12 14 25 31.3200 -97.3300 251.000 457.0 103.436 5.510 -999.990 -999.990 1.034 ..P WKT 2010 07 16 12 14 55 31.3200 -97.3300 251.000 457.0 97.034 2.880 -999.990 -999.990 0.970 ..P WKT 2010 07 16 12 19 55 31.3200 -97.3300 251.000 30.0 109.966 3.700 -999.990 -999.990 1.100 ..P WKT 2010 07 16 12 24 55 31.3200 -97.3300 251.000 122.0 102.825 3.340 -999.990 -999.990 1.028 ..P WKT 2010 07 16 12 29 55 31.3200 -97.3300 251.000 457.0 93.730 4.860 -999.990 -999.990 0.937 ..P WKT 2010 07 16 12 34 55 31.3200 -97.3300 251.000 30.0 108.059 3.570 -999.990 -999.990 1.081 ..P WKT 2010 07 16 12 39 55 31.3200 -97.3300 251.000 122.0 100.636 5.930 -999.990 -999.990 1.006 ..P WKT 2010 07 16 12 44 55 31.3200 -97.3300 251.000 457.0 91.260 3.640 -999.990 -999.990 0.913 ..P WKT 2010 07 16 12 54 55 31.3200 -97.3300 251.000 30.0 113.377 3.570 -999.990 -999.990 1.134 ..P WKT 2010 07 16 12 59 55 31.3200 -97.3300 251.000 122.0 102.472 3.360 -999.990 -999.990 1.025 ..P WKT 2010 07 16 13 04 55 31.3200 -97.3300 251.000 457.0 83.197 5.200 -999.990 -999.990 0.832 ..P WKT 2010 07 16 13 09 55 31.3200 -97.3300 251.000 30.0 94.888 3.070 -999.990 -999.990 0.949 ..P WKT 2010 07 16 13 14 55 31.3200 -97.3300 251.000 122.0 104.348 2.890 -999.990 -999.990 1.043 ..P WKT 2010 07 16 13 19 55 31.3200 -97.3300 251.000 457.0 90.371 3.130 -999.990 -999.990 0.904 ..P WKT 2010 07 16 13 29 55 31.3200 -97.3300 251.000 30.0 98.591 2.730 -999.990 -999.990 0.986 ..P WKT 2010 07 16 13 34 55 31.3200 -97.3300 251.000 122.0 101.815 2.140 -999.990 -999.990 1.018 ..P WKT 2010 07 16 13 39 55 31.3200 -97.3300 251.000 457.0 86.896 2.390 -999.990 -999.990 0.869 ..P WKT 2010 07 16 13 44 55 31.3200 -97.3300 251.000 30.0 99.889 2.730 -999.990 -999.990 0.999 ..P WKT 2010 07 16 13 49 55 31.3200 -97.3300 251.000 122.0 100.880 3.280 -999.990 -999.990 1.009 ..P WKT 2010 07 16 13 54 55 31.3200 -97.3300 251.000 457.0 86.378 2.640 -999.990 -999.990 0.864 ..P WKT 2010 07 16 14 04 55 31.3200 -97.3300 251.000 30.0 87.401 2.650 -999.990 -999.990 0.874 ..P WKT 2010 07 16 14 09 55 31.3200 -97.3300 251.000 122.0 101.954 2.890 -999.990 -999.990 1.020 ..P WKT 2010 07 16 14 14 55 31.3200 -97.3300 251.000 457.0 84.396 2.580 -999.990 -999.990 0.844 ..P WKT 2010 07 16 14 19 55 31.3200 -97.3300 251.000 30.0 97.275 3.020 -999.990 -999.990 0.973 ..P WKT 2010 07 16 14 24 55 31.3200 -97.3300 251.000 122.0 101.359 3.360 -999.990 -999.990 1.014 ..P WKT 2010 07 16 14 29 55 31.3200 -97.3300 251.000 457.0 88.405 3.370 -999.990 -999.990 0.884 ..P WKT 2010 07 16 14 39 55 31.3200 -97.3300 251.000 30.0 99.146 3.370 -999.990 -999.990 0.991 ..P WKT 2010 07 16 14 44 55 31.3200 -97.3300 251.000 122.0 99.799 2.720 -999.990 -999.990 0.998 ..P WKT 2010 07 16 14 49 55 31.3200 -97.3300 251.000 457.0 86.203 4.530 -999.990 -999.990 0.862 ..P WKT 2010 07 16 14 54 55 31.3200 -97.3300 251.000 30.0 93.421 4.420 -999.990 -999.990 0.934 ..P WKT 2010 07 16 14 59 55 31.3200 -97.3300 251.000 122.0 93.514 2.500 -999.990 -999.990 0.935 ..P WKT 2010 07 16 15 04 55 31.3200 -97.3300 251.000 457.0 76.563 3.310 -999.990 -999.990 0.766 ..P WKT 2010 07 16 15 14 55 31.3200 -97.3300 251.000 30.0 96.470 2.750 -999.990 -999.990 0.965 ..P WKT 2010 07 16 15 19 55 31.3200 -97.3300 251.000 122.0 97.842 3.220 -999.990 -999.990 0.978 ..P WKT 2010 07 16 15 24 55 31.3200 -97.3300 251.000 457.0 83.561 4.150 -999.990 -999.990 0.836 ..P WKT 2010 07 16 15 29 55 31.3200 -97.3300 251.000 30.0 107.713 3.370 -999.990 -999.990 1.077 ..P WKT 2010 07 16 15 34 55 31.3200 -97.3300 251.000 122.0 100.699 4.270 -999.990 -999.990 1.007 ..P WKT 2010 07 16 15 39 55 31.3200 -97.3300 251.000 457.0 83.900 2.570 -999.990 -999.990 0.839 ..P WKT 2010 07 16 15 49 55 31.3200 -97.3300 251.000 30.0 90.596 4.680 -999.990 -999.990 0.906 ..P WKT 2010 07 16 15 54 55 31.3200 -97.3300 251.000 122.0 97.880 2.800 -999.990 -999.990 0.979 ..P WKT 2010 07 16 15 59 55 31.3200 -97.3300 251.000 457.0 84.890 2.980 -999.990 -999.990 0.849 ..P WKT 2010 07 16 16 04 55 31.3200 -97.3300 251.000 30.0 87.281 2.940 -999.990 -999.990 0.873 ..P WKT 2010 07 16 16 09 55 31.3200 -97.3300 251.000 122.0 100.579 4.700 -999.990 -999.990 1.006 ..P WKT 2010 07 16 16 14 55 31.3200 -97.3300 251.000 457.0 95.698 2.570 -999.990 -999.990 0.957 ..P WKT 2010 07 16 16 24 55 31.3200 -97.3300 251.000 30.0 96.225 3.020 -999.990 -999.990 0.962 ..P WKT 2010 07 16 16 29 55 31.3200 -97.3300 251.000 122.0 100.516 2.440 -999.990 -999.990 1.005 ..P WKT 2010 07 16 16 34 55 31.3200 -97.3300 251.000 457.0 95.294 3.530 -999.990 -999.990 0.953 ..P WKT 2010 07 16 16 39 55 31.3200 -97.3300 251.000 30.0 90.911 2.420 -999.990 -999.990 0.909 ..P WKT 2010 07 16 16 44 55 31.3200 -97.3300 251.000 122.0 97.720 2.610 -999.990 -999.990 0.977 ..P WKT 2010 07 16 16 49 55 31.3200 -97.3300 251.000 457.0 88.300 2.840 -999.990 -999.990 0.883 ..P WKT 2010 07 16 17 04 55 31.3200 -97.3300 251.000 30.0 96.187 6.230 -999.990 -999.990 0.962 ..P WKT 2010 07 16 17 09 55 31.3200 -97.3300 251.000 122.0 90.427 3.240 -999.990 -999.990 0.904 ..P WKT 2010 07 16 17 14 55 31.3200 -97.3300 251.000 457.0 86.627 3.500 -999.990 -999.990 0.866 ..P WKT 2010 07 16 17 19 55 31.3200 -97.3300 251.000 30.0 88.704 2.270 -999.990 -999.990 0.887 ..P WKT 2010 07 16 17 24 55 31.3200 -97.3300 251.000 122.0 94.142 2.180 -999.990 -999.990 0.941 ..P WKT 2010 07 16 17 29 55 31.3200 -97.3300 251.000 457.0 85.022 2.770 -999.990 -999.990 0.850 ..P WKT 2010 07 16 17 39 55 31.3200 -97.3300 251.000 30.0 90.253 2.830 -999.990 -999.990 0.903 ..P WKT 2010 07 16 17 44 55 31.3200 -97.3300 251.000 122.0 90.887 2.890 -999.990 -999.990 0.909 ..P WKT 2010 07 16 17 49 55 31.3200 -97.3300 251.000 457.0 88.160 3.680 -999.990 -999.990 0.882 ..P WKT 2010 07 16 17 54 55 31.3200 -97.3300 251.000 30.0 87.813 2.920 -999.990 -999.990 0.878 ..P WKT 2010 07 16 17 59 55 31.3200 -97.3300 251.000 122.0 90.967 2.740 -999.990 -999.990 0.910 ..P WKT 2010 07 16 18 04 55 31.3200 -97.3300 251.000 457.0 84.878 2.830 -999.990 -999.990 0.849 ..P WKT 2010 07 16 18 14 55 31.3200 -97.3300 251.000 30.0 86.105 2.960 -999.990 -999.990 0.861 ..P WKT 2010 07 16 18 19 55 31.3200 -97.3300 251.000 122.0 98.605 3.280 -999.990 -999.990 0.986 ..P WKT 2010 07 16 18 24 55 31.3200 -97.3300 251.000 457.0 83.510 3.390 -999.990 -999.990 0.835 ..P WKT 2010 07 16 18 29 55 31.3200 -97.3300 251.000 30.0 88.027 3.790 -999.990 -999.990 0.880 ..P WKT 2010 07 16 18 34 55 31.3200 -97.3300 251.000 122.0 100.389 3.900 -999.990 -999.990 1.004 ..P WKT 2010 07 16 18 39 55 31.3200 -97.3300 251.000 457.0 80.807 4.400 -999.990 -999.990 0.808 ..P WKT 2010 07 16 18 49 55 31.3200 -97.3300 251.000 30.0 88.961 4.360 -999.990 -999.990 0.890 ..P WKT 2010 07 16 18 54 55 31.3200 -97.3300 251.000 122.0 95.121 4.030 -999.990 -999.990 0.951 ..P WKT 2010 07 16 18 59 55 31.3200 -97.3300 251.000 457.0 88.527 3.690 -999.990 -999.990 0.885 ..P WKT 2010 07 16 19 04 55 31.3200 -97.3300 251.000 30.0 94.968 3.690 -999.990 -999.990 0.950 ..P WKT 2010 07 16 19 09 55 31.3200 -97.3300 251.000 122.0 99.027 3.330 -999.990 -999.990 0.990 ..P WKT 2010 07 16 19 14 55 31.3200 -97.3300 251.000 457.0 91.731 3.750 -999.990 -999.990 0.917 ..P WKT 2010 07 16 19 24 55 31.3200 -97.3300 251.000 30.0 83.226 3.040 -999.990 -999.990 0.832 ..P WKT 2010 07 16 19 29 55 31.3200 -97.3300 251.000 122.0 93.515 3.170 -999.990 -999.990 0.935 ..P WKT 2010 07 16 19 34 55 31.3200 -97.3300 251.000 457.0 84.454 2.520 -999.990 -999.990 0.845 ..P WKT 2010 07 16 19 39 55 31.3200 -97.3300 251.000 30.0 99.232 2.880 -999.990 -999.990 0.992 ..P WKT 2010 07 16 19 44 55 31.3200 -97.3300 251.000 122.0 99.847 3.060 -999.990 -999.990 0.998 ..P WKT 2010 07 16 19 49 55 31.3200 -97.3300 251.000 457.0 88.822 2.150 -999.990 -999.990 0.888 ..P WKT 2010 07 16 19 59 55 31.3200 -97.3300 251.000 30.0 101.713 2.680 -999.990 -999.990 1.017 ..P WKT 2010 07 16 20 04 55 31.3200 -97.3300 251.000 122.0 108.661 3.740 -999.990 -999.990 1.087 ..P WKT 2010 07 16 20 09 55 31.3200 -97.3300 251.000 457.0 90.919 3.120 -999.990 -999.990 0.909 ..P WKT 2010 07 16 20 14 55 31.3200 -97.3300 251.000 30.0 99.551 2.320 -999.990 -999.990 0.996 ..P WKT 2010 07 16 20 19 55 31.3200 -97.3300 251.000 122.0 106.781 3.610 -999.990 -999.990 1.068 ..P WKT 2010 07 16 20 24 55 31.3200 -97.3300 251.000 457.0 92.403 1.470 -999.990 -999.990 0.924 ..P WKT 2010 07 16 20 34 55 31.3200 -97.3300 251.000 30.0 106.423 6.000 -999.990 -999.990 1.064 ..P WKT 2010 07 16 20 39 55 31.3200 -97.3300 251.000 122.0 104.233 3.190 -999.990 -999.990 1.042 ..P WKT 2010 07 16 20 44 55 31.3200 -97.3300 251.000 457.0 96.428 2.280 -999.990 -999.990 0.964 ..P WKT 2010 07 16 20 49 55 31.3200 -97.3300 251.000 30.0 104.061 4.250 -999.990 -999.990 1.041 ..P WKT 2010 07 16 20 54 55 31.3200 -97.3300 251.000 122.0 108.608 2.480 -999.990 -999.990 1.086 ..P WKT 2010 07 16 20 59 55 31.3200 -97.3300 251.000 457.0 97.151 2.660 -999.990 -999.990 0.972 ..P WKT 2010 07 16 21 09 55 31.3200 -97.3300 251.000 30.0 131.156 2.510 -999.990 -999.990 1.312 ..P WKT 2010 07 16 21 14 55 31.3200 -97.3300 251.000 122.0 108.948 2.540 -999.990 -999.990 1.089 ..P WKT 2010 07 16 21 19 55 31.3200 -97.3300 251.000 457.0 105.272 3.310 -999.990 -999.990 1.053 ..P WKT 2010 07 16 21 24 55 31.3200 -97.3300 251.000 30.0 103.561 2.870 -999.990 -999.990 1.036 ..P WKT 2010 07 16 21 29 55 31.3200 -97.3300 251.000 122.0 110.277 3.500 -999.990 -999.990 1.103 ..P WKT 2010 07 16 21 34 55 31.3200 -97.3300 251.000 457.0 103.229 1.690 -999.990 -999.990 1.032 ..P WKT 2010 07 16 21 44 55 31.3200 -97.3300 251.000 30.0 103.078 2.740 -999.990 -999.990 1.031 ..P WKT 2010 07 16 21 49 55 31.3200 -97.3300 251.000 122.0 159.001 8.100 -999.990 -999.990 1.590 ..P WKT 2010 07 16 21 54 55 31.3200 -97.3300 251.000 457.0 106.759 5.970 -999.990 -999.990 1.068 ..P WKT 2010 07 16 21 59 55 31.3200 -97.3300 251.000 30.0 103.121 3.120 -999.990 -999.990 1.031 ..P WKT 2010 07 16 22 04 55 31.3200 -97.3300 251.000 122.0 110.582 3.010 -999.990 -999.990 1.106 ..P WKT 2010 07 16 22 09 55 31.3200 -97.3300 251.000 457.0 104.976 2.120 -999.990 -999.990 1.050 ..P WKT 2010 07 16 22 19 55 31.3200 -97.3300 251.000 30.0 96.132 1.990 -999.990 -999.990 0.961 ..P WKT 2010 07 16 22 24 55 31.3200 -97.3300 251.000 122.0 109.757 3.300 -999.990 -999.990 1.098 ..P WKT 2010 07 16 22 29 55 31.3200 -97.3300 251.000 457.0 96.681 3.270 -999.990 -999.990 0.967 ..P WKT 2010 07 16 22 34 55 31.3200 -97.3300 251.000 30.0 91.474 2.360 -999.990 -999.990 0.915 ..P WKT 2010 07 16 22 39 55 31.3200 -97.3300 251.000 122.0 102.151 4.550 -999.990 -999.990 1.022 ..P WKT 2010 07 16 22 44 55 31.3200 -97.3300 251.000 457.0 100.880 2.300 -999.990 -999.990 1.009 ..P WKT 2010 07 16 22 54 55 31.3200 -97.3300 251.000 30.0 101.471 3.450 -999.990 -999.990 1.015 ..P WKT 2010 07 16 22 59 55 31.3200 -97.3300 251.000 122.0 104.318 3.080 -999.990 -999.990 1.043 ..P WKT 2010 07 16 23 04 55 31.3200 -97.3300 251.000 457.0 93.524 3.390 -999.990 -999.990 0.935 ..P WKT 2010 07 16 23 09 55 31.3200 -97.3300 251.000 30.0 132.652 6.900 -999.990 -999.990 1.327 ..P WKT 2010 07 16 23 14 55 31.3200 -97.3300 251.000 122.0 100.483 2.320 -999.990 -999.990 1.005 ..P WKT 2010 07 16 23 19 55 31.3200 -97.3300 251.000 457.0 96.721 1.810 -999.990 -999.990 0.967 ..P WKT 2010 07 16 23 29 55 31.3200 -97.3300 251.000 30.0 85.375 3.040 -999.990 -999.990 0.854 ..P WKT 2010 07 16 23 34 55 31.3200 -97.3300 251.000 122.0 97.205 1.940 -999.990 -999.990 0.972 ..P WKT 2010 07 16 23 39 55 31.3200 -97.3300 251.000 457.0 90.747 3.070 -999.990 -999.990 0.907 ..P WKT 2010 07 16 23 44 55 31.3200 -97.3300 251.000 30.0 95.544 2.210 -999.990 -999.990 0.955 ..P WKT 2010 07 16 23 49 55 31.3200 -97.3300 251.000 122.0 94.151 1.730 -999.990 -999.990 0.942 ..P WKT 2010 07 17 00 09 55 31.3200 -97.3300 251.000 457.0 96.691 1.760 -999.990 -999.990 0.967 ..P WKT 2010 07 17 00 10 25 31.3200 -97.3300 251.000 457.0 95.554 1.930 -999.990 -999.990 0.956 ..P WKT 2010 07 17 00 10 55 31.3200 -97.3300 251.000 457.0 90.477 1.790 -999.990 -999.990 0.905 ..P WKT 2010 07 17 00 11 25 31.3200 -97.3300 251.000 457.0 93.561 1.670 -999.990 -999.990 0.936 ..P WKT 2010 07 17 00 11 55 31.3200 -97.3300 251.000 457.0 91.580 2.440 -999.990 -999.990 0.916 ..P WKT 2010 07 17 00 12 25 31.3200 -97.3300 251.000 457.0 95.226 1.830 -999.990 -999.990 0.952 ..P WKT 2010 07 17 00 12 55 31.3200 -97.3300 251.000 457.0 87.055 2.650 -999.990 -999.990 0.871 ..P WKT 2010 07 17 00 13 25 31.3200 -97.3300 251.000 457.0 90.982 1.940 -999.990 -999.990 0.910 ..P WKT 2010 07 17 00 13 55 31.3200 -97.3300 251.000 457.0 90.690 1.770 -999.990 -999.990 0.907 ..P WKT 2010 07 17 00 14 25 31.3200 -97.3300 251.000 457.0 91.522 1.780 -999.990 -999.990 0.915 ..P WKT 2010 07 17 00 14 55 31.3200 -97.3300 251.000 457.0 96.295 3.920 -999.990 -999.990 0.963 ..P WKT 2010 07 17 00 19 55 31.3200 -97.3300 251.000 30.0 87.456 2.220 -999.990 -999.990 0.875 ..P WKT 2010 07 17 00 24 55 31.3200 -97.3300 251.000 122.0 100.002 2.510 -999.990 -999.990 1.000 ..P WKT 2010 07 17 00 29 55 31.3200 -97.3300 251.000 457.0 87.509 2.860 -999.990 -999.990 0.875 ..P WKT 2010 07 17 00 34 55 31.3200 -97.3300 251.000 30.0 97.239 1.970 -999.990 -999.990 0.972 ..P WKT 2010 07 17 00 39 55 31.3200 -97.3300 251.000 122.0 104.437 2.890 -999.990 -999.990 1.044 ..P WKT 2010 07 17 00 44 55 31.3200 -97.3300 251.000 457.0 95.883 2.160 -999.990 -999.990 0.959 ..P WKT 2010 07 17 00 54 55 31.3200 -97.3300 251.000 30.0 93.296 2.240 -999.990 -999.990 0.933 ..P WKT 2010 07 17 00 59 55 31.3200 -97.3300 251.000 122.0 98.698 2.910 -999.990 -999.990 0.987 ..P WKT 2010 07 17 01 04 55 31.3200 -97.3300 251.000 457.0 88.916 2.330 -999.990 -999.990 0.889 ..P WKT 2010 07 17 01 09 55 31.3200 -97.3300 251.000 30.0 109.497 3.400 -999.990 -999.990 1.095 ..P WKT 2010 07 17 01 14 55 31.3200 -97.3300 251.000 122.0 111.523 2.620 -999.990 -999.990 1.115 ..P WKT 2010 07 17 01 19 55 31.3200 -97.3300 251.000 457.0 94.997 2.150 -999.990 -999.990 0.950 ..P WKT 2010 07 17 01 29 55 31.3200 -97.3300 251.000 30.0 113.743 3.100 -999.990 -999.990 1.137 ..P WKT 2010 07 17 01 34 55 31.3200 -97.3300 251.000 122.0 112.475 2.370 -999.990 -999.990 1.125 ..P WKT 2010 07 17 01 39 55 31.3200 -97.3300 251.000 457.0 111.208 2.190 -999.990 -999.990 1.112 ..P WKT 2010 07 17 01 44 55 31.3200 -97.3300 251.000 30.0 122.303 2.730 -999.990 -999.990 1.223 ..P WKT 2010 07 17 01 49 55 31.3200 -97.3300 251.000 122.0 112.888 3.260 -999.990 -999.990 1.129 ..P WKT 2010 07 17 01 54 55 31.3200 -97.3300 251.000 457.0 101.648 3.300 -999.990 -999.990 1.016 ..P WKT 2010 07 17 02 04 55 31.3200 -97.3300 251.000 30.0 109.890 2.230 -999.990 -999.990 1.099 ..P WKT 2010 07 17 02 09 55 31.3200 -97.3300 251.000 122.0 105.634 1.990 -999.990 -999.990 1.056 ..P WKT 2010 07 17 02 14 55 31.3200 -97.3300 251.000 457.0 109.523 3.240 -999.990 -999.990 1.095 ..P WKT 2010 07 17 02 19 55 31.3200 -97.3300 251.000 30.0 124.223 4.320 -999.990 -999.990 1.242 ..P WKT 2010 07 17 02 24 55 31.3200 -97.3300 251.000 122.0 101.716 4.570 -999.990 -999.990 1.017 ..P WKT 2010 07 17 02 29 55 31.3200 -97.3300 251.000 457.0 103.781 2.670 -999.990 -999.990 1.038 ..P WKT 2010 07 17 02 39 55 31.3200 -97.3300 251.000 30.0 110.112 3.020 -999.990 -999.990 1.101 ..P WKT 2010 07 17 02 44 55 31.3200 -97.3300 251.000 122.0 101.469 3.350 -999.990 -999.990 1.015 ..P WKT 2010 07 17 02 49 55 31.3200 -97.3300 251.000 457.0 107.982 4.200 -999.990 -999.990 1.080 ..P WKT 2010 07 17 02 54 55 31.3200 -97.3300 251.000 30.0 103.970 4.020 -999.990 -999.990 1.040 ..P WKT 2010 07 17 02 59 55 31.3200 -97.3300 251.000 122.0 98.977 3.300 -999.990 -999.990 0.990 ..P WKT 2010 07 17 03 04 55 31.3200 -97.3300 251.000 457.0 110.400 3.450 -999.990 -999.990 1.104 ..P WKT 2010 07 17 03 14 55 31.3200 -97.3300 251.000 30.0 112.419 3.540 -999.990 -999.990 1.124 ..P WKT 2010 07 17 03 19 55 31.3200 -97.3300 251.000 122.0 104.841 3.270 -999.990 -999.990 1.048 ..P WKT 2010 07 17 03 24 55 31.3200 -97.3300 251.000 457.0 155.890 3.970 -999.990 -999.990 1.559 ..P WKT 2010 07 17 03 29 55 31.3200 -97.3300 251.000 30.0 106.800 5.260 -999.990 -999.990 1.068 ..P WKT 2010 07 17 03 34 55 31.3200 -97.3300 251.000 122.0 107.359 4.930 -999.990 -999.990 1.074 ..P WKT 2010 07 17 03 39 55 31.3200 -97.3300 251.000 457.0 113.806 2.670 -999.990 -999.990 1.138 ..P WKT 2010 07 17 03 49 55 31.3200 -97.3300 251.000 30.0 108.173 2.910 -999.990 -999.990 1.082 ..P WKT 2010 07 17 03 54 55 31.3200 -97.3300 251.000 122.0 105.067 4.800 -999.990 -999.990 1.051 ..P WKT 2010 07 17 03 59 55 31.3200 -97.3300 251.000 457.0 106.165 5.240 -999.990 -999.990 1.062 ..P WKT 2010 07 17 04 04 55 31.3200 -97.3300 251.000 30.0 115.394 3.710 -999.990 -999.990 1.154 ..P WKT 2010 07 17 04 09 55 31.3200 -97.3300 251.000 122.0 113.689 3.790 -999.990 -999.990 1.137 ..P WKT 2010 07 17 04 14 55 31.3200 -97.3300 251.000 457.0 111.704 3.150 -999.990 -999.990 1.117 ..P WKT 2010 07 17 04 24 55 31.3200 -97.3300 251.000 30.0 117.503 2.660 -999.990 -999.990 1.175 ..P WKT 2010 07 17 04 29 55 31.3200 -97.3300 251.000 122.0 109.594 2.900 -999.990 -999.990 1.096 ..P WKT 2010 07 17 04 34 55 31.3200 -97.3300 251.000 457.0 115.695 4.800 -999.990 -999.990 1.157 ..P WKT 2010 07 17 04 39 55 31.3200 -97.3300 251.000 30.0 118.994 2.990 -999.990 -999.990 1.190 ..P WKT 2010 07 17 04 44 55 31.3200 -97.3300 251.000 122.0 104.364 3.050 -999.990 -999.990 1.044 ..P WKT 2010 07 17 04 49 55 31.3200 -97.3300 251.000 457.0 111.024 3.390 -999.990 -999.990 1.110 ..P WKT 2010 07 17 05 04 55 31.3200 -97.3300 251.000 30.0 116.237 4.050 -999.990 -999.990 1.162 ..P WKT 2010 07 17 05 09 55 31.3200 -97.3300 251.000 122.0 120.694 2.870 -999.990 -999.990 1.207 ..P WKT 2010 07 17 05 14 55 31.3200 -97.3300 251.000 457.0 108.911 5.490 -999.990 -999.990 1.089 ..P WKT 2010 07 17 05 19 55 31.3200 -97.3300 251.000 30.0 120.087 3.270 -999.990 -999.990 1.201 ..P WKT 2010 07 17 05 24 55 31.3200 -97.3300 251.000 122.0 104.947 3.240 -999.990 -999.990 1.049 ..P WKT 2010 07 17 05 29 55 31.3200 -97.3300 251.000 457.0 123.679 2.550 -999.990 -999.990 1.237 ..P WKT 2010 07 17 05 39 55 31.3200 -97.3300 251.000 30.0 113.756 2.360 -999.990 -999.990 1.138 ..P WKT 2010 07 17 05 44 55 31.3200 -97.3300 251.000 122.0 102.180 2.430 -999.990 -999.990 1.022 ..P WKT 2010 07 17 05 49 55 31.3200 -97.3300 251.000 457.0 131.319 4.890 -999.990 -999.990 1.313 ..P WKT 2010 07 17 05 54 55 31.3200 -97.3300 251.000 30.0 112.608 2.790 -999.990 -999.990 1.126 ..P WKT 2010 07 17 05 59 55 31.3200 -97.3300 251.000 122.0 92.501 3.540 -999.990 -999.990 0.925 ..P WKT 2010 07 17 06 04 55 31.3200 -97.3300 251.000 457.0 149.190 3.850 -999.990 -999.990 1.492 ..P WKT 2010 07 17 06 14 55 31.3200 -97.3300 251.000 30.0 107.841 3.930 -999.990 -999.990 1.078 ..P WKT 2010 07 17 06 19 55 31.3200 -97.3300 251.000 122.0 92.337 5.150 -999.990 -999.990 0.923 ..P WKT 2010 07 17 06 24 55 31.3200 -97.3300 251.000 457.0 94.034 5.530 -999.990 -999.990 0.940 ..P WKT 2010 07 17 06 29 55 31.3200 -97.3300 251.000 30.0 106.077 5.400 -999.990 -999.990 1.061 ..P WKT 2010 07 17 06 34 55 31.3200 -97.3300 251.000 122.0 92.673 5.220 -999.990 -999.990 0.927 ..P WKT 2010 07 17 06 39 55 31.3200 -97.3300 251.000 457.0 103.036 7.120 -999.990 -999.990 1.030 ..P WKT 2010 07 17 06 49 55 31.3200 -97.3300 251.000 30.0 110.580 6.390 -999.990 -999.990 1.106 ..P WKT 2010 07 17 06 54 55 31.3200 -97.3300 251.000 122.0 119.363 6.770 -999.990 -999.990 1.194 ..P WKT 2010 07 17 06 59 55 31.3200 -97.3300 251.000 457.0 92.648 6.390 -999.990 -999.990 0.926 ..P WKT 2010 07 17 07 04 55 31.3200 -97.3300 251.000 30.0 109.953 5.570 -999.990 -999.990 1.100 ..P WKT 2010 07 17 07 09 55 31.3200 -97.3300 251.000 122.0 122.925 5.430 -999.990 -999.990 1.229 ..P WKT 2010 07 17 07 14 55 31.3200 -97.3300 251.000 457.0 86.157 6.360 -999.990 -999.990 0.862 ..P WKT 2010 07 17 07 24 55 31.3200 -97.3300 251.000 30.0 118.904 4.810 -999.990 -999.990 1.189 ..P WKT 2010 07 17 07 29 55 31.3200 -97.3300 251.000 122.0 115.628 5.190 -999.990 -999.990 1.156 ..P WKT 2010 07 17 07 34 55 31.3200 -97.3300 251.000 457.0 104.950 4.140 -999.990 -999.990 1.050 ..P WKT 2010 07 17 07 39 55 31.3200 -97.3300 251.000 30.0 121.228 3.960 -999.990 -999.990 1.212 ..P WKT 2010 07 17 07 44 55 31.3200 -97.3300 251.000 122.0 119.209 3.920 -999.990 -999.990 1.192 ..P WKT 2010 07 17 07 49 55 31.3200 -97.3300 251.000 457.0 100.016 4.740 -999.990 -999.990 1.000 ..P WKT 2010 07 17 07 59 55 31.3200 -97.3300 251.000 30.0 122.051 3.070 -999.990 -999.990 1.221 ..P WKT 2010 07 17 08 04 55 31.3200 -97.3300 251.000 122.0 102.963 3.530 -999.990 -999.990 1.030 ..P WKT 2010 07 17 08 09 55 31.3200 -97.3300 251.000 457.0 96.440 3.660 -999.990 -999.990 0.964 ..P WKT 2010 07 17 08 14 55 31.3200 -97.3300 251.000 30.0 125.929 3.470 -999.990 -999.990 1.259 ..P WKT 2010 07 17 08 19 55 31.3200 -97.3300 251.000 122.0 103.496 3.570 -999.990 -999.990 1.035 ..P WKT 2010 07 17 08 24 55 31.3200 -97.3300 251.000 457.0 112.604 2.830 -999.990 -999.990 1.126 ..P WKT 2010 07 17 08 34 55 31.3200 -97.3300 251.000 30.0 128.704 2.920 -999.990 -999.990 1.287 ..P WKT 2010 07 17 08 39 55 31.3200 -97.3300 251.000 122.0 103.328 3.680 -999.990 -999.990 1.033 ..P WKT 2010 07 17 08 44 55 31.3200 -97.3300 251.000 457.0 114.228 3.380 -999.990 -999.990 1.142 ..P WKT 2010 07 17 08 49 55 31.3200 -97.3300 251.000 30.0 129.588 3.260 -999.990 -999.990 1.296 ..P WKT 2010 07 17 08 54 55 31.3200 -97.3300 251.000 122.0 111.472 3.330 -999.990 -999.990 1.115 ..P WKT 2010 07 17 08 59 55 31.3200 -97.3300 251.000 457.0 102.563 2.400 -999.990 -999.990 1.026 ..P WKT 2010 07 17 09 09 55 31.3200 -97.3300 251.000 30.0 123.814 2.780 -999.990 -999.990 1.238 ..P WKT 2010 07 17 09 14 55 31.3200 -97.3300 251.000 122.0 111.301 4.010 -999.990 -999.990 1.113 ..P WKT 2010 07 17 09 19 55 31.3200 -97.3300 251.000 457.0 106.599 4.590 -999.990 -999.990 1.066 ..P WKT 2010 07 17 09 24 55 31.3200 -97.3300 251.000 30.0 126.711 3.420 -999.990 -999.990 1.267 ..P WKT 2010 07 17 09 29 55 31.3200 -97.3300 251.000 122.0 112.807 3.260 -999.990 -999.990 1.128 ..P WKT 2010 07 17 09 34 55 31.3200 -97.3300 251.000 457.0 103.505 3.790 -999.990 -999.990 1.035 ..P WKT 2010 07 17 09 44 55 31.3200 -97.3300 251.000 30.0 125.820 2.820 -999.990 -999.990 1.258 ..P WKT 2010 07 17 09 49 55 31.3200 -97.3300 251.000 122.0 106.286 3.630 -999.990 -999.990 1.063 ..P WKT 2010 07 17 09 54 55 31.3200 -97.3300 251.000 457.0 105.010 4.030 -999.990 -999.990 1.050 ..P WKT 2010 07 17 09 59 55 31.3200 -97.3300 251.000 30.0 119.478 4.530 -999.990 -999.990 1.195 ..P WKT 2010 07 17 10 04 55 31.3200 -97.3300 251.000 122.0 97.303 4.260 -999.990 -999.990 0.973 ..P WKT 2010 07 17 10 09 55 31.3200 -97.3300 251.000 457.0 119.710 3.510 -999.990 -999.990 1.197 ..P WKT 2010 07 17 10 19 55 31.3200 -97.3300 251.000 30.0 120.479 3.050 -999.990 -999.990 1.205 ..P WKT 2010 07 17 10 24 55 31.3200 -97.3300 251.000 122.0 102.609 4.420 -999.990 -999.990 1.026 ..P WKT 2010 07 17 10 29 55 31.3200 -97.3300 251.000 457.0 108.277 4.360 -999.990 -999.990 1.083 ..P WKT 2010 07 17 10 34 55 31.3200 -97.3300 251.000 30.0 115.476 3.640 -999.990 -999.990 1.155 ..P WKT 2010 07 17 10 39 55 31.3200 -97.3300 251.000 122.0 108.889 3.280 -999.990 -999.990 1.089 ..P WKT 2010 07 17 10 44 55 31.3200 -97.3300 251.000 457.0 118.175 3.190 -999.990 -999.990 1.182 ..P WKT 2010 07 17 10 54 55 31.3200 -97.3300 251.000 30.0 109.001 3.710 -999.990 -999.990 1.090 ..P WKT 2010 07 17 10 59 55 31.3200 -97.3300 251.000 122.0 98.898 3.100 -999.990 -999.990 0.989 ..P WKT 2010 07 17 11 04 55 31.3200 -97.3300 251.000 457.0 77.244 3.650 -999.990 -999.990 0.772 ..P WKT 2010 07 17 11 09 55 31.3200 -97.3300 251.000 30.0 113.070 3.240 -999.990 -999.990 1.131 ..P WKT 2010 07 17 11 14 55 31.3200 -97.3300 251.000 122.0 96.010 3.440 -999.990 -999.990 0.960 ..P WKT 2010 07 17 11 19 55 31.3200 -97.3300 251.000 457.0 90.781 4.220 -999.990 -999.990 0.908 ..P WKT 2010 07 17 11 29 55 31.3200 -97.3300 251.000 30.0 108.470 5.250 -999.990 -999.990 1.085 ..P WKT 2010 07 17 11 34 55 31.3200 -97.3300 251.000 122.0 98.414 3.960 -999.990 -999.990 0.984 ..P WKT 2010 07 17 11 39 55 31.3200 -97.3300 251.000 457.0 85.440 3.890 -999.990 -999.990 0.854 ..P WKT 2010 07 17 11 44 55 31.3200 -97.3300 251.000 30.0 110.854 4.090 -999.990 -999.990 1.109 ..P WKT 2010 07 17 11 49 55 31.3200 -97.3300 251.000 122.0 99.549 6.950 -999.990 -999.990 0.995 ..P WKT 2010 07 17 12 09 55 31.3200 -97.3300 251.000 457.0 91.322 3.200 -999.990 -999.990 0.913 ..P WKT 2010 07 17 12 10 25 31.3200 -97.3300 251.000 457.0 86.574 3.140 -999.990 -999.990 0.866 ..P WKT 2010 07 17 12 10 55 31.3200 -97.3300 251.000 457.0 86.276 3.330 -999.990 -999.990 0.863 ..P WKT 2010 07 17 12 11 25 31.3200 -97.3300 251.000 457.0 82.642 3.210 -999.990 -999.990 0.826 ..P WKT 2010 07 17 12 11 55 31.3200 -97.3300 251.000 457.0 80.119 3.410 -999.990 -999.990 0.801 ..P WKT 2010 07 17 12 12 25 31.3200 -97.3300 251.000 457.0 88.442 3.300 -999.990 -999.990 0.884 ..P WKT 2010 07 17 12 12 55 31.3200 -97.3300 251.000 457.0 85.085 3.430 -999.990 -999.990 0.851 ..P WKT 2010 07 17 12 13 25 31.3200 -97.3300 251.000 457.0 86.734 3.300 -999.990 -999.990 0.867 ..P WKT 2010 07 17 12 13 55 31.3200 -97.3300 251.000 457.0 85.046 3.430 -999.990 -999.990 0.850 ..P WKT 2010 07 17 12 14 25 31.3200 -97.3300 251.000 457.0 86.416 3.700 -999.990 -999.990 0.864 ..P WKT 2010 07 17 12 14 55 31.3200 -97.3300 251.000 457.0 88.898 3.700 -999.990 -999.990 0.889 ..P WKT 2010 07 17 12 19 55 31.3200 -97.3300 251.000 30.0 102.048 3.870 -999.990 -999.990 1.020 ..P WKT 2010 07 17 12 24 55 31.3200 -97.3300 251.000 122.0 97.957 3.810 -999.990 -999.990 0.980 ..P WKT 2010 07 17 12 29 55 31.3200 -97.3300 251.000 457.0 86.080 3.860 -999.990 -999.990 0.861 ..P WKT 2010 07 17 12 34 55 31.3200 -97.3300 251.000 30.0 105.624 3.610 -999.990 -999.990 1.056 ..P WKT 2010 07 17 12 39 55 31.3200 -97.3300 251.000 122.0 96.249 3.850 -999.990 -999.990 0.962 ..P WKT 2010 07 17 12 44 55 31.3200 -97.3300 251.000 457.0 93.827 4.670 -999.990 -999.990 0.938 ..P WKT 2010 07 17 12 54 55 31.3200 -97.3300 251.000 30.0 111.053 4.580 -999.990 -999.990 1.111 ..P WKT 2010 07 17 12 59 55 31.3200 -97.3300 251.000 122.0 97.615 3.970 -999.990 -999.990 0.976 ..P WKT 2010 07 17 13 04 55 31.3200 -97.3300 251.000 457.0 89.182 3.260 -999.990 -999.990 0.892 ..P WKT 2010 07 17 13 09 55 31.3200 -97.3300 251.000 30.0 103.547 4.890 -999.990 -999.990 1.035 ..P WKT 2010 07 17 13 14 55 31.3200 -97.3300 251.000 122.0 102.898 4.100 -999.990 -999.990 1.029 ..P WKT 2010 07 17 13 19 55 31.3200 -97.3300 251.000 457.0 92.797 3.070 -999.990 -999.990 0.928 ..P WKT 2010 07 17 13 29 55 31.3200 -97.3300 251.000 30.0 100.139 3.140 -999.990 -999.990 1.001 ..P WKT 2010 07 17 13 34 55 31.3200 -97.3300 251.000 122.0 101.734 3.210 -999.990 -999.990 1.017 ..P WKT 2010 07 17 13 39 55 31.3200 -97.3300 251.000 457.0 93.461 4.000 -999.990 -999.990 0.935 ..P WKT 2010 07 17 13 44 55 31.3200 -97.3300 251.000 30.0 106.870 4.890 -999.990 -999.990 1.069 ..P WKT 2010 07 17 13 49 55 31.3200 -97.3300 251.000 122.0 109.022 3.460 -999.990 -999.990 1.090 ..P WKT 2010 07 17 13 54 55 31.3200 -97.3300 251.000 457.0 88.657 3.550 -999.990 -999.990 0.887 ..P WKT 2010 07 17 14 04 55 31.3200 -97.3300 251.000 30.0 105.666 4.770 -999.990 -999.990 1.057 ..P WKT 2010 07 17 14 09 55 31.3200 -97.3300 251.000 122.0 109.961 3.440 -999.990 -999.990 1.100 ..P WKT 2010 07 17 14 14 55 31.3200 -97.3300 251.000 457.0 86.184 3.230 -999.990 -999.990 0.862 ..P WKT 2010 07 17 14 19 55 31.3200 -97.3300 251.000 30.0 99.096 3.180 -999.990 -999.990 0.991 ..P WKT 2010 07 17 14 24 55 31.3200 -97.3300 251.000 122.0 106.170 3.120 -999.990 -999.990 1.062 ..P WKT 2010 07 17 14 29 55 31.3200 -97.3300 251.000 457.0 87.396 3.110 -999.990 -999.990 0.874 ..P WKT 2010 07 17 14 39 55 31.3200 -97.3300 251.000 30.0 96.940 3.310 -999.990 -999.990 0.969 ..P WKT 2010 07 17 14 44 55 31.3200 -97.3300 251.000 122.0 102.465 3.060 -999.990 -999.990 1.025 ..P WKT 2010 07 17 14 49 55 31.3200 -97.3300 251.000 457.0 94.234 3.380 -999.990 -999.990 0.942 ..P WKT 2010 07 17 14 54 55 31.3200 -97.3300 251.000 30.0 103.511 4.020 -999.990 -999.990 1.035 ..P WKT 2010 07 17 14 59 55 31.3200 -97.3300 251.000 122.0 109.870 3.220 -999.990 -999.990 1.099 ..P WKT 2010 07 17 15 04 55 31.3200 -97.3300 251.000 457.0 94.830 3.320 -999.990 -999.990 0.948 ..P WKT 2010 07 17 15 14 55 31.3200 -97.3300 251.000 30.0 101.574 3.350 -999.990 -999.990 1.016 ..P WKT 2010 07 17 15 19 55 31.3200 -97.3300 251.000 122.0 107.654 3.170 -999.990 -999.990 1.077 ..P WKT 2010 07 17 15 24 55 31.3200 -97.3300 251.000 457.0 100.396 3.720 -999.990 -999.990 1.004 ..P WKT 2010 07 17 15 29 55 31.3200 -97.3300 251.000 30.0 94.250 4.450 -999.990 -999.990 0.943 ..P WKT 2010 07 17 15 34 55 31.3200 -97.3300 251.000 122.0 112.696 3.540 -999.990 -999.990 1.127 ..P WKT 2010 07 17 15 39 55 31.3200 -97.3300 251.000 457.0 103.076 3.950 -999.990 -999.990 1.031 ..P WKT 2010 07 17 15 49 55 31.3200 -97.3300 251.000 30.0 99.994 3.580 -999.990 -999.990 1.000 ..P WKT 2010 07 17 15 54 55 31.3200 -97.3300 251.000 122.0 111.253 3.520 -999.990 -999.990 1.113 ..P WKT 2010 07 17 15 59 55 31.3200 -97.3300 251.000 457.0 103.064 3.770 -999.990 -999.990 1.031 ..P WKT 2010 07 17 16 04 55 31.3200 -97.3300 251.000 30.0 107.377 5.420 -999.990 -999.990 1.074 ..P WKT 2010 07 17 16 09 55 31.3200 -97.3300 251.000 122.0 105.301 3.910 -999.990 -999.990 1.053 ..P WKT 2010 07 17 16 14 55 31.3200 -97.3300 251.000 457.0 95.722 4.060 -999.990 -999.990 0.957 ..P WKT 2010 07 17 16 24 55 31.3200 -97.3300 251.000 30.0 102.602 3.410 -999.990 -999.990 1.026 ..P WKT 2010 07 17 16 29 55 31.3200 -97.3300 251.000 122.0 109.892 3.450 -999.990 -999.990 1.099 ..P WKT 2010 07 17 16 34 55 31.3200 -97.3300 251.000 457.0 105.790 3.700 -999.990 -999.990 1.058 ..P WKT 2010 07 17 16 39 55 31.3200 -97.3300 251.000 30.0 99.746 3.680 -999.990 -999.990 0.997 ..P WKT 2010 07 17 16 44 55 31.3200 -97.3300 251.000 122.0 105.368 3.450 -999.990 -999.990 1.054 ..P WKT 2010 07 17 16 49 55 31.3200 -97.3300 251.000 457.0 96.822 4.090 -999.990 -999.990 0.968 ..P WKT 2010 07 17 17 04 55 31.3200 -97.3300 251.000 30.0 94.676 4.220 -999.990 -999.990 0.947 ..P WKT 2010 07 17 17 09 55 31.3200 -97.3300 251.000 122.0 106.763 4.050 -999.990 -999.990 1.068 ..P WKT 2010 07 17 17 14 55 31.3200 -97.3300 251.000 457.0 94.685 3.840 -999.990 -999.990 0.947 ..P WKT 2010 07 17 17 19 55 31.3200 -97.3300 251.000 30.0 95.106 4.490 -999.990 -999.990 0.951 ..P WKT 2010 07 17 17 24 55 31.3200 -97.3300 251.000 122.0 107.748 3.790 -999.990 -999.990 1.077 ..P WKT 2010 07 17 17 29 55 31.3200 -97.3300 251.000 457.0 90.532 4.330 -999.990 -999.990 0.905 ..P WKT 2010 07 17 17 39 55 31.3200 -97.3300 251.000 30.0 103.835 4.230 -999.990 -999.990 1.038 ..P WKT 2010 07 17 17 44 55 31.3200 -97.3300 251.000 122.0 109.774 3.900 -999.990 -999.990 1.098 ..P WKT 2010 07 17 17 49 55 31.3200 -97.3300 251.000 457.0 99.048 3.950 -999.990 -999.990 0.990 ..P WKT 2010 07 17 17 54 55 31.3200 -97.3300 251.000 30.0 97.766 4.690 -999.990 -999.990 0.978 ..P WKT 2010 07 17 17 59 55 31.3200 -97.3300 251.000 122.0 107.314 3.950 -999.990 -999.990 1.073 ..P WKT 2010 07 17 18 04 55 31.3200 -97.3300 251.000 457.0 98.534 3.910 -999.990 -999.990 0.985 ..P WKT 2010 07 17 18 14 55 31.3200 -97.3300 251.000 30.0 98.508 3.970 -999.990 -999.990 0.985 ..P WKT 2010 07 17 18 19 55 31.3200 -97.3300 251.000 122.0 101.014 4.400 -999.990 -999.990 1.010 ..P WKT 2010 07 17 18 24 55 31.3200 -97.3300 251.000 457.0 97.688 4.240 -999.990 -999.990 0.977 ..P WKT 2010 07 17 18 29 55 31.3200 -97.3300 251.000 30.0 102.138 4.280 -999.990 -999.990 1.021 ..P WKT 2010 07 17 18 34 55 31.3200 -97.3300 251.000 122.0 108.809 4.320 -999.990 -999.990 1.088 ..P WKT 2010 07 17 18 39 55 31.3200 -97.3300 251.000 457.0 102.707 4.170 -999.990 -999.990 1.027 ..P WKT 2010 07 17 18 49 55 31.3200 -97.3300 251.000 30.0 102.642 4.260 -999.990 -999.990 1.026 ..P WKT 2010 07 17 18 54 55 31.3200 -97.3300 251.000 122.0 111.038 4.370 -999.990 -999.990 1.110 ..P WKT 2010 07 17 18 59 55 31.3200 -97.3300 251.000 457.0 100.692 5.060 -999.990 -999.990 1.007 ..P WKT 2010 07 17 19 04 55 31.3200 -97.3300 251.000 30.0 97.288 4.170 -999.990 -999.990 0.973 ..P WKT 2010 07 17 19 09 55 31.3200 -97.3300 251.000 122.0 109.987 4.080 -999.990 -999.990 1.100 ..P WKT 2010 07 17 19 14 55 31.3200 -97.3300 251.000 457.0 94.506 5.130 -999.990 -999.990 0.945 ..P WKT 2010 07 17 19 24 55 31.3200 -97.3300 251.000 30.0 96.800 3.980 -999.990 -999.990 0.968 ..P WKT 2010 07 17 19 29 55 31.3200 -97.3300 251.000 122.0 97.779 4.010 -999.990 -999.990 0.978 ..P WKT 2010 07 17 19 34 55 31.3200 -97.3300 251.000 457.0 96.398 5.820 -999.990 -999.990 0.964 ..P WKT 2010 07 17 19 39 55 31.3200 -97.3300 251.000 30.0 102.789 3.910 -999.990 -999.990 1.028 ..P WKT 2010 07 17 19 44 55 31.3200 -97.3300 251.000 122.0 113.622 4.200 -999.990 -999.990 1.136 ..P WKT 2010 07 17 19 49 55 31.3200 -97.3300 251.000 457.0 93.365 3.930 -999.990 -999.990 0.934 ..P WKT 2010 07 17 19 59 55 31.3200 -97.3300 251.000 30.0 105.613 3.800 -999.990 -999.990 1.056 ..P WKT 2010 07 17 20 04 55 31.3200 -97.3300 251.000 122.0 113.134 3.960 -999.990 -999.990 1.131 ..P WKT 2010 07 17 20 09 55 31.3200 -97.3300 251.000 457.0 100.947 4.480 -999.990 -999.990 1.009 ..P WKT 2010 07 17 20 14 55 31.3200 -97.3300 251.000 30.0 105.137 4.990 -999.990 -999.990 1.051 ..P WKT 2010 07 17 20 19 55 31.3200 -97.3300 251.000 122.0 110.993 4.470 -999.990 -999.990 1.110 ..P WKT 2010 07 17 20 24 55 31.3200 -97.3300 251.000 457.0 107.133 4.920 -999.990 -999.990 1.071 ..P WKT 2010 07 17 20 34 55 31.3200 -97.3300 251.000 30.0 105.878 4.150 -999.990 -999.990 1.059 ..P WKT 2010 07 17 20 39 55 31.3200 -97.3300 251.000 122.0 107.095 4.800 -999.990 -999.990 1.071 ..P WKT 2010 07 17 20 44 55 31.3200 -97.3300 251.000 457.0 100.817 4.930 -999.990 -999.990 1.008 ..P WKT 2010 07 17 20 49 55 31.3200 -97.3300 251.000 30.0 99.536 5.810 -999.990 -999.990 0.995 ..P WKT 2010 07 17 20 54 55 31.3200 -97.3300 251.000 122.0 107.690 5.220 -999.990 -999.990 1.077 ..P WKT 2010 07 17 20 59 55 31.3200 -97.3300 251.000 457.0 95.585 5.720 -999.990 -999.990 0.956 ..P WKT 2010 07 17 21 09 55 31.3200 -97.3300 251.000 30.0 100.971 4.430 -999.990 -999.990 1.010 ..P WKT 2010 07 17 21 14 55 31.3200 -97.3300 251.000 122.0 101.533 5.500 -999.990 -999.990 1.015 ..P WKT 2010 07 17 21 19 55 31.3200 -97.3300 251.000 457.0 101.262 5.860 -999.990 -999.990 1.013 ..P WKT 2010 07 17 21 24 55 31.3200 -97.3300 251.000 30.0 107.929 5.810 -999.990 -999.990 1.079 ..P WKT 2010 07 17 21 29 55 31.3200 -97.3300 251.000 122.0 113.901 5.490 -999.990 -999.990 1.139 ..P WKT 2010 07 17 21 34 55 31.3200 -97.3300 251.000 457.0 97.398 4.760 -999.990 -999.990 0.974 ..P WKT 2010 07 17 21 44 55 31.3200 -97.3300 251.000 30.0 106.469 4.340 -999.990 -999.990 1.065 ..P WKT 2010 07 17 21 49 55 31.3200 -97.3300 251.000 122.0 116.227 5.620 -999.990 -999.990 1.162 ..P WKT 2010 07 17 21 54 55 31.3200 -97.3300 251.000 457.0 102.262 5.810 -999.990 -999.990 1.023 ..P WKT 2010 07 17 21 59 55 31.3200 -97.3300 251.000 30.0 107.302 5.330 -999.990 -999.990 1.073 ..P WKT 2010 07 17 22 04 55 31.3200 -97.3300 251.000 122.0 112.898 4.730 -999.990 -999.990 1.129 ..P WKT 2010 07 17 22 09 55 31.3200 -97.3300 251.000 457.0 98.517 4.630 -999.990 -999.990 0.985 ..P WKT 2010 07 17 22 19 55 31.3200 -97.3300 251.000 30.0 97.501 4.800 -999.990 -999.990 0.975 ..P WKT 2010 07 17 22 24 55 31.3200 -97.3300 251.000 122.0 108.922 4.850 -999.990 -999.990 1.089 ..P WKT 2010 07 17 22 29 55 31.3200 -97.3300 251.000 457.0 97.733 4.930 -999.990 -999.990 0.977 ..P WKT 2010 07 17 22 34 55 31.3200 -97.3300 251.000 30.0 97.225 4.210 -999.990 -999.990 0.972 ..P WKT 2010 07 17 22 39 55 31.3200 -97.3300 251.000 122.0 106.009 6.110 -999.990 -999.990 1.060 ..P WKT 2010 07 17 22 44 55 31.3200 -97.3300 251.000 457.0 102.589 4.900 -999.990 -999.990 1.026 ..P WKT 2010 07 17 22 54 55 31.3200 -97.3300 251.000 30.0 102.840 4.120 -999.990 -999.990 1.028 ..P WKT 2010 07 17 22 59 55 31.3200 -97.3300 251.000 122.0 108.038 4.100 -999.990 -999.990 1.080 ..P WKT 2010 07 17 23 04 55 31.3200 -97.3300 251.000 457.0 105.885 4.050 -999.990 -999.990 1.059 ..P WKT 2010 07 17 23 09 55 31.3200 -97.3300 251.000 30.0 99.155 4.630 -999.990 -999.990 0.992 ..P WKT 2010 07 17 23 14 55 31.3200 -97.3300 251.000 122.0 110.039 4.250 -999.990 -999.990 1.100 ..P WKT 2010 07 17 23 19 55 31.3200 -97.3300 251.000 457.0 100.536 4.180 -999.990 -999.990 1.005 ..P WKT 2010 07 17 23 29 55 31.3200 -97.3300 251.000 30.0 104.438 4.170 -999.990 -999.990 1.044 ..P WKT 2010 07 17 23 34 55 31.3200 -97.3300 251.000 122.0 104.668 4.150 -999.990 -999.990 1.047 ..P WKT 2010 07 17 23 39 55 31.3200 -97.3300 251.000 457.0 105.729 4.270 -999.990 -999.990 1.057 ..P WKT 2010 07 17 23 44 55 31.3200 -97.3300 251.000 30.0 98.471 4.650 -999.990 -999.990 0.985 ..P WKT 2010 07 17 23 49 55 31.3200 -97.3300 251.000 122.0 108.407 4.610 -999.990 -999.990 1.084 ..P WKT 2010 07 18 00 09 55 31.3200 -97.3300 251.000 457.0 100.825 4.080 -999.990 -999.990 1.008 ..P WKT 2010 07 18 00 10 25 31.3200 -97.3300 251.000 457.0 103.236 4.110 -999.990 -999.990 1.032 ..P WKT 2010 07 18 00 10 55 31.3200 -97.3300 251.000 457.0 105.371 4.110 -999.990 -999.990 1.054 ..P WKT 2010 07 18 00 11 25 31.3200 -97.3300 251.000 457.0 104.455 4.610 -999.990 -999.990 1.045 ..P WKT 2010 07 18 00 11 55 31.3200 -97.3300 251.000 457.0 100.765 4.160 -999.990 -999.990 1.008 ..P WKT 2010 07 18 00 12 25 31.3200 -97.3300 251.000 457.0 98.462 3.990 -999.990 -999.990 0.985 ..P WKT 2010 07 18 00 12 55 31.3200 -97.3300 251.000 457.0 100.042 4.020 -999.990 -999.990 1.000 ..P WKT 2010 07 18 00 13 25 31.3200 -97.3300 251.000 457.0 102.177 4.440 -999.990 -999.990 1.022 ..P WKT 2010 07 18 00 13 55 31.3200 -97.3300 251.000 457.0 97.100 4.550 -999.990 -999.990 0.971 ..P WKT 2010 07 18 00 14 25 31.3200 -97.3300 251.000 457.0 104.227 4.280 -999.990 -999.990 1.042 ..P WKT 2010 07 18 00 14 55 31.3200 -97.3300 251.000 457.0 102.756 4.190 -999.990 -999.990 1.028 ..P WKT 2010 07 18 00 19 55 31.3200 -97.3300 251.000 30.0 101.914 4.330 -999.990 -999.990 1.019 ..P WKT 2010 07 18 00 24 55 31.3200 -97.3300 251.000 122.0 105.509 5.540 -999.990 -999.990 1.055 ..P WKT 2010 07 18 00 29 55 31.3200 -97.3300 251.000 457.0 102.447 4.710 -999.990 -999.990 1.024 ..P WKT 2010 07 18 00 34 55 31.3200 -97.3300 251.000 30.0 94.392 4.800 -999.990 -999.990 0.944 ..P WKT 2010 07 18 00 39 55 31.3200 -97.3300 251.000 122.0 98.820 4.840 -999.990 -999.990 0.988 ..P WKT 2010 07 18 00 44 55 31.3200 -97.3300 251.000 457.0 98.809 4.250 -999.990 -999.990 0.988 ..P WKT 2010 07 18 00 54 55 31.3200 -97.3300 251.000 30.0 101.376 5.120 -999.990 -999.990 1.014 ..P WKT 2010 07 18 00 59 55 31.3200 -97.3300 251.000 122.0 101.178 5.090 -999.990 -999.990 1.012 ..P WKT 2010 07 18 01 04 55 31.3200 -97.3300 251.000 457.0 101.536 4.870 -999.990 -999.990 1.015 ..P WKT 2010 07 18 01 09 55 31.3200 -97.3300 251.000 30.0 98.285 5.180 -999.990 -999.990 0.983 ..P WKT 2010 07 18 01 14 55 31.3200 -97.3300 251.000 122.0 107.802 5.620 -999.990 -999.990 1.078 ..P WKT 2010 07 18 01 19 55 31.3200 -97.3300 251.000 457.0 103.025 5.610 -999.990 -999.990 1.030 ..P WKT 2010 07 18 01 29 55 31.3200 -97.3300 251.000 30.0 113.477 5.300 -999.990 -999.990 1.135 ..P WKT 2010 07 18 01 34 55 31.3200 -97.3300 251.000 122.0 112.605 5.200 -999.990 -999.990 1.126 ..P WKT 2010 07 18 01 39 55 31.3200 -97.3300 251.000 457.0 102.433 5.000 -999.990 -999.990 1.024 ..P WKT 2010 07 18 01 44 55 31.3200 -97.3300 251.000 30.0 111.418 5.130 -999.990 -999.990 1.114 ..P WKT 2010 07 18 01 49 55 31.3200 -97.3300 251.000 122.0 108.325 4.540 -999.990 -999.990 1.083 ..P WKT 2010 07 18 01 54 55 31.3200 -97.3300 251.000 457.0 105.649 4.190 -999.990 -999.990 1.056 ..P WKT 2010 07 18 02 04 55 31.3200 -97.3300 251.000 30.0 106.265 3.940 -999.990 -999.990 1.063 ..P WKT 2010 07 18 02 09 55 31.3200 -97.3300 251.000 122.0 113.448 4.440 -999.990 -999.990 1.134 ..P WKT 2010 07 18 02 14 55 31.3200 -97.3300 251.000 457.0 99.660 4.860 -999.990 -999.990 0.997 ..P WKT 2010 07 18 02 19 55 31.3200 -97.3300 251.000 30.0 112.955 5.120 -999.990 -999.990 1.130 ..P WKT 2010 07 18 02 24 55 31.3200 -97.3300 251.000 122.0 117.223 4.270 -999.990 -999.990 1.172 ..P WKT 2010 07 18 02 29 55 31.3200 -97.3300 251.000 457.0 101.070 4.590 -999.990 -999.990 1.011 ..P WKT 2010 07 18 02 39 55 31.3200 -97.3300 251.000 30.0 116.712 4.760 -999.990 -999.990 1.167 ..P WKT 2010 07 18 02 44 55 31.3200 -97.3300 251.000 122.0 116.972 4.590 -999.990 -999.990 1.170 ..P WKT 2010 07 18 02 49 55 31.3200 -97.3300 251.000 457.0 97.916 4.360 -999.990 -999.990 0.979 ..P WKT 2010 07 18 02 54 55 31.3200 -97.3300 251.000 30.0 114.573 6.090 -999.990 -999.990 1.146 ..P WKT 2010 07 18 02 59 55 31.3200 -97.3300 251.000 122.0 106.632 4.670 -999.990 -999.990 1.066 ..P WKT 2010 07 18 03 04 55 31.3200 -97.3300 251.000 457.0 102.027 4.350 -999.990 -999.990 1.020 ..P WKT 2010 07 18 03 14 55 31.3200 -97.3300 251.000 30.0 110.269 4.600 -999.990 -999.990 1.103 ..P WKT 2010 07 18 03 19 55 31.3200 -97.3300 251.000 122.0 110.052 5.110 -999.990 -999.990 1.101 ..P WKT 2010 07 18 03 24 55 31.3200 -97.3300 251.000 457.0 103.995 4.380 -999.990 -999.990 1.040 ..P WKT 2010 07 18 03 29 55 31.3200 -97.3300 251.000 30.0 118.515 4.790 -999.990 -999.990 1.185 ..P WKT 2010 07 18 03 34 55 31.3200 -97.3300 251.000 122.0 110.512 4.360 -999.990 -999.990 1.105 ..P WKT 2010 07 18 03 39 55 31.3200 -97.3300 251.000 457.0 107.236 4.530 -999.990 -999.990 1.072 ..P WKT 2010 07 18 03 49 55 31.3200 -97.3300 251.000 30.0 123.409 5.770 -999.990 -999.990 1.234 ..P WKT 2010 07 18 03 54 55 31.3200 -97.3300 251.000 122.0 118.663 3.950 -999.990 -999.990 1.187 ..P WKT 2010 07 18 03 59 55 31.3200 -97.3300 251.000 457.0 105.571 4.230 -999.990 -999.990 1.056 ..P WKT 2010 07 18 04 04 55 31.3200 -97.3300 251.000 30.0 122.799 4.150 -999.990 -999.990 1.228 ..P WKT 2010 07 18 04 09 55 31.3200 -97.3300 251.000 122.0 116.382 4.890 -999.990 -999.990 1.164 ..P WKT 2010 07 18 04 14 55 31.3200 -97.3300 251.000 457.0 108.018 3.750 -999.990 -999.990 1.080 ..P WKT 2010 07 18 04 24 55 31.3200 -97.3300 251.000 30.0 122.052 3.570 -999.990 -999.990 1.221 ..P WKT 2010 07 18 04 29 55 31.3200 -97.3300 251.000 122.0 124.420 3.750 -999.990 -999.990 1.244 ..P WKT 2010 07 18 04 34 55 31.3200 -97.3300 251.000 457.0 103.411 4.400 -999.990 -999.990 1.034 ..P WKT 2010 07 18 04 39 55 31.3200 -97.3300 251.000 30.0 114.126 5.320 -999.990 -999.990 1.141 ..P WKT 2010 07 18 04 44 55 31.3200 -97.3300 251.000 122.0 120.669 4.620 -999.990 -999.990 1.207 ..P WKT 2010 07 18 04 49 55 31.3200 -97.3300 251.000 457.0 110.511 4.370 -999.990 -999.990 1.105 ..P WKT 2010 07 18 05 04 55 31.3200 -97.3300 251.000 30.0 117.584 4.680 -999.990 -999.990 1.176 ..P WKT 2010 07 18 05 09 55 31.3200 -97.3300 251.000 122.0 109.914 5.970 -999.990 -999.990 1.099 ..P WKT 2010 07 18 05 14 55 31.3200 -97.3300 251.000 457.0 101.826 5.270 -999.990 -999.990 1.018 ..P WKT 2010 07 18 05 19 55 31.3200 -97.3300 251.000 30.0 113.924 5.160 -999.990 -999.990 1.139 ..P WKT 2010 07 18 05 24 55 31.3200 -97.3300 251.000 122.0 107.506 3.810 -999.990 -999.990 1.075 ..P WKT 2010 07 18 05 29 55 31.3200 -97.3300 251.000 457.0 98.023 3.870 -999.990 -999.990 0.980 ..P WKT 2010 07 18 05 39 55 31.3200 -97.3300 251.000 30.0 115.676 3.550 -999.990 -999.990 1.157 ..P WKT 2010 07 18 05 44 55 31.3200 -97.3300 251.000 122.0 105.351 4.180 -999.990 -999.990 1.054 ..P WKT 2010 07 18 05 49 55 31.3200 -97.3300 251.000 457.0 107.978 3.970 -999.990 -999.990 1.080 ..P WKT 2010 07 18 05 54 55 31.3200 -97.3300 251.000 30.0 110.606 3.670 -999.990 -999.990 1.106 ..P WKT 2010 07 18 05 59 55 31.3200 -97.3300 251.000 122.0 110.866 3.230 -999.990 -999.990 1.109 ..P WKT 2010 07 18 06 04 55 31.3200 -97.3300 251.000 457.0 101.513 3.080 -999.990 -999.990 1.015 ..P WKT 2010 07 18 06 14 55 31.3200 -97.3300 251.000 30.0 103.823 3.270 -999.990 -999.990 1.038 ..P WKT 2010 07 18 06 19 55 31.3200 -97.3300 251.000 122.0 106.850 3.190 -999.990 -999.990 1.069 ..P WKT 2010 07 18 06 24 55 31.3200 -97.3300 251.000 457.0 103.606 3.230 -999.990 -999.990 1.036 ..P WKT 2010 07 18 06 29 55 31.3200 -97.3300 251.000 30.0 104.543 3.640 -999.990 -999.990 1.045 ..P WKT 2010 07 18 06 34 55 31.3200 -97.3300 251.000 122.0 104.922 3.270 -999.990 -999.990 1.049 ..P WKT 2010 07 18 06 39 55 31.3200 -97.3300 251.000 457.0 101.259 3.380 -999.990 -999.990 1.013 ..P WKT 2010 07 18 06 49 55 31.3200 -97.3300 251.000 30.0 110.182 3.170 -999.990 -999.990 1.102 ..P WKT 2010 07 18 06 54 55 31.3200 -97.3300 251.000 122.0 110.363 3.110 -999.990 -999.990 1.104 ..P WKT 2010 07 18 06 59 55 31.3200 -97.3300 251.000 457.0 102.736 3.840 -999.990 -999.990 1.027 ..P WKT 2010 07 18 07 04 55 31.3200 -97.3300 251.000 30.0 105.007 3.570 -999.990 -999.990 1.050 ..P WKT 2010 07 18 07 09 55 31.3200 -97.3300 251.000 122.0 106.721 3.620 -999.990 -999.990 1.067 ..P WKT 2010 07 18 07 14 55 31.3200 -97.3300 251.000 457.0 95.886 2.760 -999.990 -999.990 0.959 ..P WKT 2010 07 18 07 24 55 31.3200 -97.3300 251.000 30.0 102.520 2.850 -999.990 -999.990 1.025 ..P WKT 2010 07 18 07 29 55 31.3200 -97.3300 251.000 122.0 112.742 2.790 -999.990 -999.990 1.127 ..P WKT 2010 07 18 07 34 55 31.3200 -97.3300 251.000 457.0 98.697 3.090 -999.990 -999.990 0.987 ..P WKT 2010 07 18 07 39 55 31.3200 -97.3300 251.000 30.0 100.829 4.360 -999.990 -999.990 1.008 ..P WKT 2010 07 18 07 44 55 31.3200 -97.3300 251.000 122.0 111.889 2.850 -999.990 -999.990 1.119 ..P WKT 2010 07 18 07 49 55 31.3200 -97.3300 251.000 457.0 100.352 2.960 -999.990 -999.990 1.004 ..P WKT 2010 07 18 07 59 55 31.3200 -97.3300 251.000 30.0 112.471 3.130 -999.990 -999.990 1.125 ..P WKT 2010 07 18 08 04 55 31.3200 -97.3300 251.000 122.0 117.436 3.160 -999.990 -999.990 1.174 ..P WKT 2010 07 18 08 09 55 31.3200 -97.3300 251.000 457.0 100.354 4.790 -999.990 -999.990 1.004 ..P WKT 2010 07 18 08 14 55 31.3200 -97.3300 251.000 30.0 109.505 3.130 -999.990 -999.990 1.095 ..P WKT 2010 07 18 08 19 55 31.3200 -97.3300 251.000 122.0 114.749 3.310 -999.990 -999.990 1.147 ..P WKT 2010 07 18 08 24 55 31.3200 -97.3300 251.000 457.0 100.455 3.050 -999.990 -999.990 1.005 ..P WKT 2010 07 18 08 34 55 31.3200 -97.3300 251.000 30.0 118.044 3.150 -999.990 -999.990 1.180 ..P WKT 2010 07 18 08 39 55 31.3200 -97.3300 251.000 122.0 125.922 3.430 -999.990 -999.990 1.259 ..P WKT 2010 07 18 08 44 55 31.3200 -97.3300 251.000 457.0 98.902 3.350 -999.990 -999.990 0.989 ..P WKT 2010 07 18 08 49 55 31.3200 -97.3300 251.000 30.0 116.274 3.920 -999.990 -999.990 1.163 ..P WKT 2010 07 18 08 54 55 31.3200 -97.3300 251.000 122.0 128.901 3.590 -999.990 -999.990 1.289 ..P WKT 2010 07 18 08 59 55 31.3200 -97.3300 251.000 457.0 110.533 3.730 -999.990 -999.990 1.105 ..P WKT 2010 07 18 09 09 55 31.3200 -97.3300 251.000 30.0 107.702 3.240 -999.990 -999.990 1.077 ..P WKT 2010 07 18 09 14 55 31.3200 -97.3300 251.000 122.0 120.731 3.470 -999.990 -999.990 1.207 ..P WKT 2010 07 18 09 19 55 31.3200 -97.3300 251.000 457.0 116.025 3.080 -999.990 -999.990 1.160 ..P WKT 2010 07 18 09 24 55 31.3200 -97.3300 251.000 30.0 116.206 2.650 -999.990 -999.990 1.162 ..P WKT 2010 07 18 09 29 55 31.3200 -97.3300 251.000 122.0 121.835 3.580 -999.990 -999.990 1.218 ..P WKT 2010 07 18 09 34 55 31.3200 -97.3300 251.000 457.0 126.207 2.590 -999.990 -999.990 1.262 ..P WKT 2010 07 18 09 44 55 31.3200 -97.3300 251.000 30.0 112.700 3.410 -999.990 -999.990 1.127 ..P WKT 2010 07 18 09 49 55 31.3200 -97.3300 251.000 122.0 128.349 3.710 -999.990 -999.990 1.283 ..P WKT 2010 07 18 09 54 55 31.3200 -97.3300 251.000 457.0 132.124 3.320 -999.990 -999.990 1.321 ..P WKT 2010 07 18 09 59 55 31.3200 -97.3300 251.000 30.0 113.682 3.070 -999.990 -999.990 1.137 ..P WKT 2010 07 18 10 04 55 31.3200 -97.3300 251.000 122.0 118.714 3.830 -999.990 -999.990 1.187 ..P WKT 2010 07 18 10 09 55 31.3200 -97.3300 251.000 457.0 118.996 3.650 -999.990 -999.990 1.190 ..P WKT 2010 07 18 10 19 55 31.3200 -97.3300 251.000 30.0 113.828 3.820 -999.990 -999.990 1.138 ..P WKT 2010 07 18 10 24 55 31.3200 -97.3300 251.000 122.0 119.839 3.890 -999.990 -999.990 1.198 ..P WKT 2010 07 18 10 29 55 31.3200 -97.3300 251.000 457.0 131.164 5.400 -999.990 -999.990 1.312 ..P WKT 2010 07 18 10 34 55 31.3200 -97.3300 251.000 30.0 109.639 3.940 -999.990 -999.990 1.096 ..P WKT 2010 07 18 10 39 55 31.3200 -97.3300 251.000 122.0 122.222 3.550 -999.990 -999.990 1.222 ..P WKT 2010 07 18 10 44 55 31.3200 -97.3300 251.000 457.0 117.051 3.400 -999.990 -999.990 1.171 ..P WKT 2010 07 18 10 54 55 31.3200 -97.3300 251.000 30.0 111.082 2.880 -999.990 -999.990 1.111 ..P WKT 2010 07 18 10 59 55 31.3200 -97.3300 251.000 122.0 123.708 4.450 -999.990 -999.990 1.237 ..P WKT 2010 07 18 11 04 55 31.3200 -97.3300 251.000 457.0 116.618 4.780 -999.990 -999.990 1.166 ..P WKT 2010 07 18 11 09 55 31.3200 -97.3300 251.000 30.0 111.765 4.670 -999.990 -999.990 1.118 ..P WKT 2010 07 18 11 14 55 31.3200 -97.3300 251.000 122.0 121.457 3.350 -999.990 -999.990 1.215 ..P WKT 2010 07 18 11 19 55 31.3200 -97.3300 251.000 457.0 118.562 3.890 -999.990 -999.990 1.186 ..P WKT 2010 07 18 11 29 55 31.3200 -97.3300 251.000 30.0 119.185 4.060 -999.990 -999.990 1.192 ..P WKT 2010 07 18 11 34 55 31.3200 -97.3300 251.000 122.0 129.979 5.130 -999.990 -999.990 1.300 ..P WKT 2010 07 18 11 39 55 31.3200 -97.3300 251.000 457.0 104.398 4.270 -999.990 -999.990 1.044 ..P WKT 2010 07 18 11 44 55 31.3200 -97.3300 251.000 30.0 117.991 4.060 -999.990 -999.990 1.180 ..P WKT 2010 07 18 11 49 55 31.3200 -97.3300 251.000 122.0 119.272 3.890 -999.990 -999.990 1.193 ..P WKT 2010 07 18 12 09 55 31.3200 -97.3300 251.000 457.0 89.852 4.040 -999.990 -999.990 0.899 ..P WKT 2010 07 18 12 10 25 31.3200 -97.3300 251.000 457.0 96.858 4.540 -999.990 -999.990 0.969 ..P WKT 2010 07 18 12 10 55 31.3200 -97.3300 251.000 457.0 94.345 3.980 -999.990 -999.990 0.943 ..P WKT 2010 07 18 12 11 25 31.3200 -97.3300 251.000 457.0 95.751 4.200 -999.990 -999.990 0.958 ..P WKT 2010 07 18 12 11 55 31.3200 -97.3300 251.000 457.0 92.679 4.520 -999.990 -999.990 0.927 ..P WKT 2010 07 18 12 12 25 31.3200 -97.3300 251.000 457.0 92.126 3.990 -999.990 -999.990 0.921 ..P WKT 2010 07 18 12 12 55 31.3200 -97.3300 251.000 457.0 92.133 4.330 -999.990 -999.990 0.921 ..P WKT 2010 07 18 12 13 25 31.3200 -97.3300 251.000 457.0 96.060 4.510 -999.990 -999.990 0.961 ..P WKT 2010 07 18 12 13 55 31.3200 -97.3300 251.000 457.0 95.506 4.150 -999.990 -999.990 0.955 ..P WKT 2010 07 18 12 14 25 31.3200 -97.3300 251.000 457.0 94.674 4.310 -999.990 -999.990 0.947 ..P WKT 2010 07 18 12 14 55 31.3200 -97.3300 251.000 457.0 94.960 4.270 -999.990 -999.990 0.950 ..P WKT 2010 07 18 12 19 55 31.3200 -97.3300 251.000 30.0 105.389 3.950 -999.990 -999.990 1.054 ..P WKT 2010 07 18 12 24 55 31.3200 -97.3300 251.000 122.0 114.700 4.090 -999.990 -999.990 1.147 ..P WKT 2010 07 18 12 29 55 31.3200 -97.3300 251.000 457.0 98.529 3.810 -999.990 -999.990 0.985 ..P WKT 2010 07 18 12 34 55 31.3200 -97.3300 251.000 30.0 113.441 4.120 -999.990 -999.990 1.134 ..P WKT 2010 07 18 12 39 55 31.3200 -97.3300 251.000 122.0 119.114 4.210 -999.990 -999.990 1.191 ..P WKT 2010 07 18 12 44 55 31.3200 -97.3300 251.000 457.0 101.540 4.500 -999.990 -999.990 1.015 ..P WKT 2010 07 18 12 54 55 31.3200 -97.3300 251.000 30.0 111.362 3.540 -999.990 -999.990 1.114 ..P WKT 2010 07 18 12 59 55 31.3200 -97.3300 251.000 122.0 121.956 4.450 -999.990 -999.990 1.220 ..P WKT 2010 07 18 13 04 55 31.3200 -97.3300 251.000 457.0 98.653 4.580 -999.990 -999.990 0.987 ..P WKT 2010 07 18 13 09 55 31.3200 -97.3300 251.000 30.0 117.372 3.420 -999.990 -999.990 1.174 ..P WKT 2010 07 18 13 14 55 31.3200 -97.3300 251.000 122.0 123.065 3.570 -999.990 -999.990 1.231 ..P WKT 2010 07 18 13 19 55 31.3200 -97.3300 251.000 457.0 97.235 4.140 -999.990 -999.990 0.972 ..P WKT 2010 07 18 13 29 55 31.3200 -97.3300 251.000 30.0 119.811 3.680 -999.990 -999.990 1.198 ..P WKT 2010 07 18 13 34 55 31.3200 -97.3300 251.000 122.0 121.001 3.540 -999.990 -999.990 1.210 ..P WKT 2010 07 18 13 39 55 31.3200 -97.3300 251.000 457.0 102.011 3.470 -999.990 -999.990 1.020 ..P WKT 2010 07 18 13 44 55 31.3200 -97.3300 251.000 30.0 119.037 4.220 -999.990 -999.990 1.190 ..P WKT 2010 07 18 13 49 55 31.3200 -97.3300 251.000 122.0 122.330 4.880 -999.990 -999.990 1.223 ..P WKT 2010 07 18 13 54 55 31.3200 -97.3300 251.000 457.0 100.253 3.680 -999.990 -999.990 1.003 ..P WKT 2010 07 18 14 04 55 31.3200 -97.3300 251.000 30.0 117.912 3.520 -999.990 -999.990 1.179 ..P WKT 2010 07 18 14 09 55 31.3200 -97.3300 251.000 122.0 110.551 3.260 -999.990 -999.990 1.106 ..P WKT 2010 07 18 14 14 55 31.3200 -97.3300 251.000 457.0 94.355 3.290 -999.990 -999.990 0.944 ..P WKT 2010 07 18 14 19 55 31.3200 -97.3300 251.000 30.0 112.651 2.910 -999.990 -999.990 1.127 ..P WKT 2010 07 18 14 24 55 31.3200 -97.3300 251.000 122.0 120.993 3.090 -999.990 -999.990 1.210 ..P WKT 2010 07 18 14 29 55 31.3200 -97.3300 251.000 457.0 100.307 2.830 -999.990 -999.990 1.003 ..P WKT 2010 07 18 14 39 55 31.3200 -97.3300 251.000 30.0 113.548 2.550 -999.990 -999.990 1.135 ..P WKT 2010 07 18 14 44 55 31.3200 -97.3300 251.000 122.0 117.324 2.340 -999.990 -999.990 1.173 ..P WKT 2010 07 18 14 49 55 31.3200 -97.3300 251.000 457.0 115.209 3.470 -999.990 -999.990 1.152 ..P WKT 2010 07 18 14 54 55 31.3200 -97.3300 251.000 30.0 111.971 3.570 -999.990 -999.990 1.120 ..P WKT 2010 07 18 14 59 55 31.3200 -97.3300 251.000 122.0 114.204 2.840 -999.990 -999.990 1.142 ..P WKT 2010 07 18 15 04 55 31.3200 -97.3300 251.000 457.0 102.688 2.630 -999.990 -999.990 1.027 ..P WKT 2010 07 18 15 14 55 31.3200 -97.3300 251.000 30.0 108.257 2.860 -999.990 -999.990 1.083 ..P WKT 2010 07 18 15 19 55 31.3200 -97.3300 251.000 122.0 118.611 3.020 -999.990 -999.990 1.186 ..P WKT 2010 07 18 15 24 55 31.3200 -97.3300 251.000 457.0 111.281 3.240 -999.990 -999.990 1.113 ..P WKT 2010 07 18 15 29 55 31.3200 -97.3300 251.000 30.0 109.846 4.160 -999.990 -999.990 1.098 ..P WKT 2010 07 18 15 34 55 31.3200 -97.3300 251.000 122.0 117.394 3.480 -999.990 -999.990 1.174 ..P WKT 2010 07 18 15 39 55 31.3200 -97.3300 251.000 457.0 114.556 3.620 -999.990 -999.990 1.146 ..P WKT 2010 07 18 15 49 55 31.3200 -97.3300 251.000 30.0 112.809 4.700 -999.990 -999.990 1.128 ..P WKT 2010 07 18 15 54 55 31.3200 -97.3300 251.000 122.0 122.887 3.750 -999.990 -999.990 1.229 ..P WKT 2010 07 18 15 59 55 31.3200 -97.3300 251.000 457.0 109.095 4.750 -999.990 -999.990 1.091 ..P WKT 2010 07 18 16 04 55 31.3200 -97.3300 251.000 30.0 109.064 3.770 -999.990 -999.990 1.091 ..P WKT 2010 07 18 16 09 55 31.3200 -97.3300 251.000 122.0 111.841 3.820 -999.990 -999.990 1.118 ..P WKT 2010 07 18 16 14 55 31.3200 -97.3300 251.000 457.0 104.506 4.440 -999.990 -999.990 1.045 ..P WKT 2010 07 18 16 24 55 31.3200 -97.3300 251.000 30.0 107.774 4.020 -999.990 -999.990 1.078 ..P WKT 2010 07 18 16 29 55 31.3200 -97.3300 251.000 122.0 113.321 3.620 -999.990 -999.990 1.133 ..P WKT 2010 07 18 16 34 55 31.3200 -97.3300 251.000 457.0 104.258 4.240 -999.990 -999.990 1.043 ..P WKT 2010 07 18 16 39 55 31.3200 -97.3300 251.000 30.0 113.739 3.290 -999.990 -999.990 1.137 ..P WKT 2010 07 18 16 44 55 31.3200 -97.3300 251.000 122.0 122.661 3.590 -999.990 -999.990 1.227 ..P WKT 2010 07 18 16 49 55 31.3200 -97.3300 251.000 457.0 112.473 3.240 -999.990 -999.990 1.125 ..P WKT 2010 07 18 17 04 55 31.3200 -97.3300 251.000 30.0 116.495 4.340 -999.990 -999.990 1.165 ..P WKT 2010 07 18 17 09 55 31.3200 -97.3300 251.000 122.0 114.887 3.020 -999.990 -999.990 1.149 ..P WKT 2010 07 18 17 14 55 31.3200 -97.3300 251.000 457.0 103.862 3.280 -999.990 -999.990 1.039 ..P WKT 2010 07 18 17 19 55 31.3200 -97.3300 251.000 30.0 108.579 3.360 -999.990 -999.990 1.086 ..P WKT 2010 07 18 17 24 55 31.3200 -97.3300 251.000 122.0 119.764 4.250 -999.990 -999.990 1.198 ..P WKT 2010 07 18 17 29 55 31.3200 -97.3300 251.000 457.0 98.755 4.680 -999.990 -999.990 0.988 ..P WKT 2010 07 18 17 39 55 31.3200 -97.3300 251.000 30.0 112.601 3.330 -999.990 -999.990 1.126 ..P WKT 2010 07 18 17 44 55 31.3200 -97.3300 251.000 122.0 120.042 3.580 -999.990 -999.990 1.200 ..P WKT 2010 07 18 17 49 55 31.3200 -97.3300 251.000 457.0 102.733 4.180 -999.990 -999.990 1.027 ..P WKT 2010 07 18 17 54 55 31.3200 -97.3300 251.000 30.0 109.332 3.210 -999.990 -999.990 1.093 ..P WKT 2010 07 18 17 59 55 31.3200 -97.3300 251.000 122.0 109.882 3.460 -999.990 -999.990 1.099 ..P WKT 2010 07 18 18 04 55 31.3200 -97.3300 251.000 457.0 108.746 3.750 -999.990 -999.990 1.087 ..P WKT 2010 07 18 18 14 55 31.3200 -97.3300 251.000 30.0 109.306 2.970 -999.990 -999.990 1.093 ..P WKT 2010 07 18 18 19 55 31.3200 -97.3300 251.000 122.0 117.193 4.090 -999.990 -999.990 1.172 ..P WKT 2010 07 18 18 24 55 31.3200 -97.3300 251.000 457.0 112.981 3.480 -999.990 -999.990 1.130 ..P WKT 2010 07 18 18 29 55 31.3200 -97.3300 251.000 30.0 113.271 3.930 -999.990 -999.990 1.133 ..P WKT 2010 07 18 18 34 55 31.3200 -97.3300 251.000 122.0 117.220 4.460 -999.990 -999.990 1.172 ..P WKT 2010 07 18 18 39 55 31.3200 -97.3300 251.000 457.0 109.208 3.610 -999.990 -999.990 1.092 ..P WKT 2010 07 18 18 49 55 31.3200 -97.3300 251.000 30.0 119.881 2.980 -999.990 -999.990 1.199 ..P WKT 2010 07 18 18 54 55 31.3200 -97.3300 251.000 122.0 122.666 3.370 -999.990 -999.990 1.227 ..P WKT 2010 07 18 18 59 55 31.3200 -97.3300 251.000 457.0 117.990 3.410 -999.990 -999.990 1.180 ..P WKT 2010 07 18 19 04 55 31.3200 -97.3300 251.000 30.0 116.974 3.820 -999.990 -999.990 1.170 ..P WKT 2010 07 18 19 09 55 31.3200 -97.3300 251.000 122.0 128.769 4.090 -999.990 -999.990 1.288 ..P WKT 2010 07 18 19 14 55 31.3200 -97.3300 251.000 457.0 115.503 4.710 -999.990 -999.990 1.155 ..P WKT 2010 07 18 19 24 55 31.3200 -97.3300 251.000 30.0 119.585 4.270 -999.990 -999.990 1.196 ..P WKT 2010 07 18 19 29 55 31.3200 -97.3300 251.000 122.0 128.205 4.770 -999.990 -999.990 1.282 ..P WKT 2010 07 18 19 34 55 31.3200 -97.3300 251.000 457.0 115.982 3.700 -999.990 -999.990 1.160 ..P WKT 2010 07 18 19 39 55 31.3200 -97.3300 251.000 30.0 116.433 3.520 -999.990 -999.990 1.164 ..P WKT 2010 07 18 19 44 55 31.3200 -97.3300 251.000 122.0 136.887 3.360 -999.990 -999.990 1.369 ..P WKT 2010 07 18 19 49 55 31.3200 -97.3300 251.000 457.0 122.126 2.820 -999.990 -999.990 1.221 ..P WKT 2010 07 18 19 59 55 31.3200 -97.3300 251.000 30.0 122.105 2.770 -999.990 -999.990 1.221 ..P WKT 2010 07 18 20 04 55 31.3200 -97.3300 251.000 122.0 119.095 3.390 -999.990 -999.990 1.191 ..P WKT 2010 07 18 20 09 55 31.3200 -97.3300 251.000 457.0 117.212 3.460 -999.990 -999.990 1.172 ..P WKT 2010 07 18 20 14 55 31.3200 -97.3300 251.000 30.0 120.120 3.610 -999.990 -999.990 1.201 ..P WKT 2010 07 18 20 19 55 31.3200 -97.3300 251.000 122.0 124.720 4.730 -999.990 -999.990 1.247 ..P WKT 2010 07 18 20 24 55 31.3200 -97.3300 251.000 457.0 111.280 4.890 -999.990 -999.990 1.113 ..P WKT 2010 07 18 20 34 55 31.3200 -97.3300 251.000 30.0 119.815 4.990 -999.990 -999.990 1.198 ..P WKT 2010 07 18 20 39 55 31.3200 -97.3300 251.000 122.0 129.672 4.500 -999.990 -999.990 1.297 ..P WKT 2010 07 18 20 44 55 31.3200 -97.3300 251.000 457.0 116.974 4.350 -999.990 -999.990 1.170 ..P WKT 2010 07 18 20 49 55 31.3200 -97.3300 251.000 30.0 117.808 5.020 -999.990 -999.990 1.178 ..P WKT 2010 07 18 20 54 55 31.3200 -97.3300 251.000 122.0 121.181 3.530 -999.990 -999.990 1.212 ..P WKT 2010 07 18 20 59 55 31.3200 -97.3300 251.000 457.0 115.390 4.580 -999.990 -999.990 1.154 ..P WKT 2010 07 18 21 09 55 31.3200 -97.3300 251.000 30.0 118.248 4.680 -999.990 -999.990 1.182 ..P WKT 2010 07 18 21 14 55 31.3200 -97.3300 251.000 122.0 129.157 3.600 -999.990 -999.990 1.292 ..P WKT 2010 07 18 21 19 55 31.3200 -97.3300 251.000 457.0 111.295 2.900 -999.990 -999.990 1.113 ..P WKT 2010 07 18 21 24 55 31.3200 -97.3300 251.000 30.0 118.397 3.980 -999.990 -999.990 1.184 ..P WKT 2010 07 18 21 29 55 31.3200 -97.3300 251.000 122.0 117.741 3.150 -999.990 -999.990 1.177 ..P WKT 2010 07 18 21 34 55 31.3200 -97.3300 251.000 457.0 102.696 2.880 -999.990 -999.990 1.027 ..P WKT 2010 07 18 21 44 55 31.3200 -97.3300 251.000 30.0 112.488 2.790 -999.990 -999.990 1.125 ..P WKT 2010 07 18 21 49 55 31.3200 -97.3300 251.000 122.0 116.448 3.920 -999.990 -999.990 1.164 ..P WKT 2010 07 18 21 54 55 31.3200 -97.3300 251.000 457.0 107.143 3.950 -999.990 -999.990 1.071 ..P WKT 2010 07 18 21 59 55 31.3200 -97.3300 251.000 30.0 115.195 4.040 -999.990 -999.990 1.152 ..P WKT 2010 07 18 22 04 55 31.3200 -97.3300 251.000 122.0 122.261 2.890 -999.990 -999.990 1.223 ..P WKT 2010 07 18 22 09 55 31.3200 -97.3300 251.000 457.0 114.932 2.520 -999.990 -999.990 1.149 ..P WKT 2010 07 18 22 19 55 31.3200 -97.3300 251.000 30.0 113.941 3.910 -999.990 -999.990 1.139 ..P WKT 2010 07 18 22 24 55 31.3200 -97.3300 251.000 122.0 116.753 2.840 -999.990 -999.990 1.168 ..P WKT 2010 07 18 22 29 55 31.3200 -97.3300 251.000 457.0 112.647 3.690 -999.990 -999.990 1.126 ..P WKT 2010 07 18 22 34 55 31.3200 -97.3300 251.000 30.0 109.530 3.370 -999.990 -999.990 1.095 ..P WKT 2010 07 18 22 39 55 31.3200 -97.3300 251.000 122.0 111.919 4.120 -999.990 -999.990 1.119 ..P WKT 2010 07 18 22 44 55 31.3200 -97.3300 251.000 457.0 115.720 3.550 -999.990 -999.990 1.157 ..P WKT 2010 07 18 22 54 55 31.3200 -97.3300 251.000 30.0 109.645 3.620 -999.990 -999.990 1.096 ..P WKT 2010 07 18 22 59 55 31.3200 -97.3300 251.000 122.0 111.773 3.080 -999.990 -999.990 1.118 ..P WKT 2010 07 18 23 04 55 31.3200 -97.3300 251.000 457.0 110.227 4.450 -999.990 -999.990 1.102 ..P WKT 2010 07 18 23 09 55 31.3200 -97.3300 251.000 30.0 110.801 4.900 -999.990 -999.990 1.108 ..P WKT 2010 07 18 23 14 55 31.3200 -97.3300 251.000 122.0 109.962 4.400 -999.990 -999.990 1.100 ..P WKT 2010 07 18 23 19 55 31.3200 -97.3300 251.000 457.0 101.776 3.390 -999.990 -999.990 1.018 ..P WKT 2010 07 18 23 29 55 31.3200 -97.3300 251.000 30.0 118.007 4.010 -999.990 -999.990 1.180 ..P WKT 2010 07 18 23 34 55 31.3200 -97.3300 251.000 122.0 115.861 4.620 -999.990 -999.990 1.159 ..P WKT 2010 07 18 23 39 55 31.3200 -97.3300 251.000 457.0 118.803 4.750 -999.990 -999.990 1.188 ..P WKT 2010 07 18 23 44 55 31.3200 -97.3300 251.000 30.0 116.374 5.500 -999.990 -999.990 1.164 ..P WKT 2010 07 18 23 49 55 31.3200 -97.3300 251.000 122.0 117.337 4.090 -999.990 -999.990 1.173 ..P WKT 2010 07 19 00 09 55 31.3200 -97.3300 251.000 457.0 118.432 2.970 -999.990 -999.990 1.184 ..P WKT 2010 07 19 00 10 25 31.3200 -97.3300 251.000 457.0 111.926 3.630 -999.990 -999.990 1.119 ..P WKT 2010 07 19 00 10 55 31.3200 -97.3300 251.000 457.0 121.813 3.770 -999.990 -999.990 1.218 ..P WKT 2010 07 19 00 11 25 31.3200 -97.3300 251.000 457.0 116.438 2.990 -999.990 -999.990 1.164 ..P WKT 2010 07 19 00 11 55 31.3200 -97.3300 251.000 457.0 119.258 3.760 -999.990 -999.990 1.193 ..P WKT 2010 07 19 00 12 25 31.3200 -97.3300 251.000 457.0 120.383 3.590 -999.990 -999.990 1.204 ..P WKT 2010 07 19 00 12 55 31.3200 -97.3300 251.000 457.0 117.834 3.230 -999.990 -999.990 1.178 ..P WKT 2010 07 19 00 13 25 31.3200 -97.3300 251.000 457.0 117.828 3.070 -999.990 -999.990 1.178 ..P WKT 2010 07 19 00 13 55 31.3200 -97.3300 251.000 457.0 117.258 2.910 -999.990 -999.990 1.173 ..P WKT 2010 07 19 00 14 25 31.3200 -97.3300 251.000 457.0 120.361 3.290 -999.990 -999.990 1.204 ..P WKT 2010 07 19 00 14 55 31.3200 -97.3300 251.000 457.0 118.943 3.040 -999.990 -999.990 1.189 ..P WKT 2010 07 19 00 19 55 31.3200 -97.3300 251.000 30.0 114.367 4.110 -999.990 -999.990 1.144 ..P WKT 2010 07 19 00 24 55 31.3200 -97.3300 251.000 122.0 117.703 4.190 -999.990 -999.990 1.177 ..P WKT 2010 07 19 00 29 55 31.3200 -97.3300 251.000 457.0 111.436 4.090 -999.990 -999.990 1.114 ..P WKT 2010 07 19 00 34 55 31.3200 -97.3300 251.000 30.0 114.489 3.890 -999.990 -999.990 1.145 ..P WKT 2010 07 19 00 39 55 31.3200 -97.3300 251.000 122.0 124.882 5.080 -999.990 -999.990 1.249 ..P WKT 2010 07 19 00 44 55 31.3200 -97.3300 251.000 457.0 118.051 3.210 -999.990 -999.990 1.181 ..P WKT 2010 07 19 00 54 55 31.3200 -97.3300 251.000 30.0 111.201 3.380 -999.990 -999.990 1.112 ..P WKT 2010 07 19 00 59 55 31.3200 -97.3300 251.000 122.0 117.104 3.550 -999.990 -999.990 1.171 ..P WKT 2010 07 19 01 04 55 31.3200 -97.3300 251.000 457.0 115.671 3.470 -999.990 -999.990 1.157 ..P WKT 2010 07 19 01 09 55 31.3200 -97.3300 251.000 30.0 115.084 4.000 -999.990 -999.990 1.151 ..P WKT 2010 07 19 01 14 55 31.3200 -97.3300 251.000 122.0 119.151 3.580 -999.990 -999.990 1.192 ..P WKT 2010 07 19 01 19 55 31.3200 -97.3300 251.000 457.0 118.424 3.920 -999.990 -999.990 1.184 ..P WKT 2010 07 19 01 29 55 31.3200 -97.3300 251.000 30.0 119.344 3.750 -999.990 -999.990 1.193 ..P WKT 2010 07 19 01 34 55 31.3200 -97.3300 251.000 122.0 120.005 4.360 -999.990 -999.990 1.200 ..P WKT 2010 07 19 01 39 55 31.3200 -97.3300 251.000 457.0 116.299 5.000 -999.990 -999.990 1.163 ..P WKT 2010 07 19 01 44 55 31.3200 -97.3300 251.000 30.0 120.482 5.730 -999.990 -999.990 1.205 ..P WKT 2010 07 19 01 49 55 31.3200 -97.3300 251.000 122.0 118.326 5.890 -999.990 -999.990 1.183 ..P WKT 2010 07 19 01 54 55 31.3200 -97.3300 251.000 457.0 113.213 6.270 -999.990 -999.990 1.132 ..P WKT 2010 07 19 02 04 55 31.3200 -97.3300 251.000 30.0 120.247 6.580 -999.990 -999.990 1.202 ..P WKT 2010 07 19 02 09 55 31.3200 -97.3300 251.000 122.0 120.706 6.260 -999.990 -999.990 1.207 ..P WKT 2010 07 19 02 14 55 31.3200 -97.3300 251.000 457.0 117.788 5.460 -999.990 -999.990 1.178 ..P WKT 2010 07 19 02 19 55 31.3200 -97.3300 251.000 30.0 123.313 6.810 -999.990 -999.990 1.233 ..P WKT 2010 07 19 02 24 55 31.3200 -97.3300 251.000 122.0 116.316 4.450 -999.990 -999.990 1.163 ..P WKT 2010 07 19 02 29 55 31.3200 -97.3300 251.000 457.0 112.838 4.760 -999.990 -999.990 1.128 ..P WKT 2010 07 19 02 39 55 31.3200 -97.3300 251.000 30.0 121.631 3.580 -999.990 -999.990 1.216 ..P WKT 2010 07 19 02 44 55 31.3200 -97.3300 251.000 122.0 109.438 3.880 -999.990 -999.990 1.094 ..P WKT 2010 07 19 02 49 55 31.3200 -97.3300 251.000 457.0 115.380 3.430 -999.990 -999.990 1.154 ..P WKT 2010 07 19 02 54 55 31.3200 -97.3300 251.000 30.0 115.278 3.340 -999.990 -999.990 1.153 ..P WKT 2010 07 19 02 59 55 31.3200 -97.3300 251.000 122.0 113.348 3.740 -999.990 -999.990 1.133 ..P WKT 2010 07 19 03 04 55 31.3200 -97.3300 251.000 457.0 112.684 4.010 -999.990 -999.990 1.127 ..P WKT 2010 07 19 03 14 55 31.3200 -97.3300 251.000 30.0 116.011 3.190 -999.990 -999.990 1.160 ..P WKT 2010 07 19 03 19 55 31.3200 -97.3300 251.000 122.0 123.088 3.070 -999.990 -999.990 1.231 ..P WKT 2010 07 19 03 24 55 31.3200 -97.3300 251.000 457.0 118.092 3.130 -999.990 -999.990 1.181 ..P WKT 2010 07 19 03 29 55 31.3200 -97.3300 251.000 30.0 113.376 3.990 -999.990 -999.990 1.134 ..P WKT 2010 07 19 03 34 55 31.3200 -97.3300 251.000 122.0 144.589 3.270 -999.990 -999.990 1.446 ..P WKT 2010 07 19 03 39 55 31.3200 -97.3300 251.000 457.0 121.350 3.980 -999.990 -999.990 1.214 ..P WKT 2010 07 19 03 49 55 31.3200 -97.3300 251.000 30.0 112.648 3.130 -999.990 -999.990 1.126 ..P WKT 2010 07 19 03 54 55 31.3200 -97.3300 251.000 122.0 108.939 3.680 -999.990 -999.990 1.089 ..P WKT 2010 07 19 03 59 55 31.3200 -97.3300 251.000 457.0 114.767 3.350 -999.990 -999.990 1.148 ..P WKT 2010 07 19 04 04 55 31.3200 -97.3300 251.000 30.0 107.695 3.640 -999.990 -999.990 1.077 ..P WKT 2010 07 19 04 09 55 31.3200 -97.3300 251.000 122.0 118.847 2.480 -999.990 -999.990 1.188 ..P WKT 2010 07 19 04 14 55 31.3200 -97.3300 251.000 457.0 111.217 2.480 -999.990 -999.990 1.112 ..P WKT 2010 07 19 04 24 55 31.3200 -97.3300 251.000 30.0 112.575 2.580 -999.990 -999.990 1.126 ..P WKT 2010 07 19 04 29 55 31.3200 -97.3300 251.000 122.0 123.518 2.690 -999.990 -999.990 1.235 ..P WKT 2010 07 19 04 34 55 31.3200 -97.3300 251.000 457.0 112.051 2.790 -999.990 -999.990 1.121 ..P WKT 2010 07 19 04 39 55 31.3200 -97.3300 251.000 30.0 114.029 2.730 -999.990 -999.990 1.140 ..P WKT 2010 07 19 04 44 55 31.3200 -97.3300 251.000 122.0 126.087 3.090 -999.990 -999.990 1.261 ..P WKT 2010 07 19 04 49 55 31.3200 -97.3300 251.000 457.0 114.625 3.490 -999.990 -999.990 1.146 ..P WKT 2010 07 19 05 04 55 31.3200 -97.3300 251.000 30.0 113.653 3.450 -999.990 -999.990 1.137 ..P WKT 2010 07 19 05 09 55 31.3200 -97.3300 251.000 122.0 124.070 3.560 -999.990 -999.990 1.241 ..P WKT 2010 07 19 05 14 55 31.3200 -97.3300 251.000 457.0 121.896 4.200 -999.990 -999.990 1.219 ..P WKT 2010 07 19 05 19 55 31.3200 -97.3300 251.000 30.0 121.820 3.060 -999.990 -999.990 1.218 ..P WKT 2010 07 19 05 24 55 31.3200 -97.3300 251.000 122.0 130.832 3.460 -999.990 -999.990 1.308 ..P WKT 2010 07 19 05 29 55 31.3200 -97.3300 251.000 457.0 122.088 3.120 -999.990 -999.990 1.221 ..P WKT 2010 07 19 05 39 55 31.3200 -97.3300 251.000 30.0 122.328 2.960 -999.990 -999.990 1.223 ..P WKT 2010 07 19 05 44 55 31.3200 -97.3300 251.000 122.0 125.578 2.710 -999.990 -999.990 1.256 ..P WKT 2010 07 19 05 49 55 31.3200 -97.3300 251.000 457.0 116.813 3.900 -999.990 -999.990 1.168 ..P WKT 2010 07 19 05 54 55 31.3200 -97.3300 251.000 30.0 119.644 3.050 -999.990 -999.990 1.196 ..P WKT 2010 07 19 05 59 55 31.3200 -97.3300 251.000 122.0 116.609 3.810 -999.990 -999.990 1.166 ..P WKT 2010 07 19 06 04 55 31.3200 -97.3300 251.000 457.0 118.601 3.770 -999.990 -999.990 1.186 ..P WKT 2010 07 19 06 14 55 31.3200 -97.3300 251.000 30.0 115.944 3.940 -999.990 -999.990 1.159 ..P WKT 2010 07 19 06 19 55 31.3200 -97.3300 251.000 122.0 113.668 4.230 -999.990 -999.990 1.137 ..P WKT 2010 07 19 06 24 55 31.3200 -97.3300 251.000 457.0 113.626 3.110 -999.990 -999.990 1.136 ..P WKT 2010 07 19 06 29 55 31.3200 -97.3300 251.000 30.0 119.723 3.320 -999.990 -999.990 1.197 ..P WKT 2010 07 19 06 34 55 31.3200 -97.3300 251.000 122.0 121.493 3.310 -999.990 -999.990 1.215 ..P WKT 2010 07 19 06 39 55 31.3200 -97.3300 251.000 457.0 108.480 4.010 -999.990 -999.990 1.085 ..P WKT 2010 07 19 06 49 55 31.3200 -97.3300 251.000 30.0 122.857 2.520 -999.990 -999.990 1.229 ..P WKT 2010 07 19 06 54 55 31.3200 -97.3300 251.000 122.0 120.683 3.480 -999.990 -999.990 1.207 ..P WKT 2010 07 19 06 59 55 31.3200 -97.3300 251.000 457.0 97.606 3.630 -999.990 -999.990 0.976 ..P WKT 2010 07 19 07 04 55 31.3200 -97.3300 251.000 30.0 115.920 4.750 -999.990 -999.990 1.159 ..P WKT 2010 07 19 07 09 55 31.3200 -97.3300 251.000 122.0 117.788 4.200 -999.990 -999.990 1.178 ..P WKT 2010 07 19 07 14 55 31.3200 -97.3300 251.000 457.0 96.812 3.700 -999.990 -999.990 0.968 ..P WKT 2010 07 19 07 24 55 31.3200 -97.3300 251.000 30.0 119.152 3.040 -999.990 -999.990 1.192 ..P WKT 2010 07 19 07 29 55 31.3200 -97.3300 251.000 122.0 119.567 4.390 -999.990 -999.990 1.196 ..P WKT 2010 07 19 07 34 55 31.3200 -97.3300 251.000 457.0 98.824 4.650 -999.990 -999.990 0.988 ..P WKT 2010 07 19 07 39 55 31.3200 -97.3300 251.000 30.0 121.788 5.810 -999.990 -999.990 1.218 ..P WKT 2010 07 19 07 44 55 31.3200 -97.3300 251.000 122.0 128.324 4.470 -999.990 -999.990 1.283 ..P WKT 2010 07 19 07 49 55 31.3200 -97.3300 251.000 457.0 98.965 5.110 -999.990 -999.990 0.990 ..P WKT 2010 07 19 07 59 55 31.3200 -97.3300 251.000 30.0 123.920 3.570 -999.990 -999.990 1.239 ..P WKT 2010 07 19 08 04 55 31.3200 -97.3300 251.000 122.0 121.473 4.950 -999.990 -999.990 1.215 ..P WKT 2010 07 19 08 09 55 31.3200 -97.3300 251.000 457.0 88.162 4.970 -999.990 -999.990 0.882 ..P WKT 2010 07 19 08 14 55 31.3200 -97.3300 251.000 30.0 119.918 5.000 -999.990 -999.990 1.199 ..P WKT 2010 07 19 08 19 55 31.3200 -97.3300 251.000 122.0 123.031 4.100 -999.990 -999.990 1.230 ..P WKT 2010 07 19 08 24 55 31.3200 -97.3300 251.000 457.0 87.514 3.470 -999.990 -999.990 0.875 ..P WKT 2010 07 19 08 34 55 31.3200 -97.3300 251.000 30.0 114.686 3.180 -999.990 -999.990 1.147 ..P WKT 2010 07 19 08 39 55 31.3200 -97.3300 251.000 122.0 125.120 3.880 -999.990 -999.990 1.251 ..P WKT 2010 07 19 08 44 55 31.3200 -97.3300 251.000 457.0 93.891 4.130 -999.990 -999.990 0.939 ..P WKT 2010 07 19 08 49 55 31.3200 -97.3300 251.000 30.0 113.489 3.580 -999.990 -999.990 1.135 ..P WKT 2010 07 19 08 54 55 31.3200 -97.3300 251.000 122.0 121.280 4.720 -999.990 -999.990 1.213 ..P WKT 2010 07 19 08 59 55 31.3200 -97.3300 251.000 457.0 97.840 2.730 -999.990 -999.990 0.978 ..P WKT 2010 07 19 09 09 55 31.3200 -97.3300 251.000 30.0 123.035 4.040 -999.990 -999.990 1.230 ..P WKT 2010 07 19 09 14 55 31.3200 -97.3300 251.000 122.0 112.825 4.100 -999.990 -999.990 1.128 ..P WKT 2010 07 19 09 19 55 31.3200 -97.3300 251.000 457.0 98.041 4.450 -999.990 -999.990 0.980 ..P WKT 2010 07 19 09 24 55 31.3200 -97.3300 251.000 30.0 124.312 3.160 -999.990 -999.990 1.243 ..P WKT 2010 07 19 09 29 55 31.3200 -97.3300 251.000 122.0 116.464 3.760 -999.990 -999.990 1.165 ..P WKT 2010 07 19 09 34 55 31.3200 -97.3300 251.000 457.0 95.171 3.660 -999.990 -999.990 0.952 ..P WKT 2010 07 19 09 44 55 31.3200 -97.3300 251.000 30.0 122.554 3.070 -999.990 -999.990 1.226 ..P WKT 2010 07 19 09 49 55 31.3200 -97.3300 251.000 122.0 114.257 5.570 -999.990 -999.990 1.143 ..P WKT 2010 07 19 09 54 55 31.3200 -97.3300 251.000 457.0 93.217 3.290 -999.990 -999.990 0.932 ..P WKT 2010 07 19 09 59 55 31.3200 -97.3300 251.000 30.0 123.573 3.050 -999.990 -999.990 1.236 ..P WKT 2010 07 19 10 04 55 31.3200 -97.3300 251.000 122.0 110.017 2.790 -999.990 -999.990 1.100 ..P WKT 2010 07 19 10 09 55 31.3200 -97.3300 251.000 457.0 90.373 2.560 -999.990 -999.990 0.904 ..P WKT 2010 07 19 10 19 55 31.3200 -97.3300 251.000 30.0 117.052 3.260 -999.990 -999.990 1.171 ..P WKT 2010 07 19 10 24 55 31.3200 -97.3300 251.000 122.0 111.732 3.520 -999.990 -999.990 1.117 ..P WKT 2010 07 19 10 29 55 31.3200 -97.3300 251.000 457.0 92.990 3.240 -999.990 -999.990 0.930 ..P WKT 2010 07 19 10 34 55 31.3200 -97.3300 251.000 30.0 119.219 3.790 -999.990 -999.990 1.192 ..P WKT 2010 07 19 10 39 55 31.3200 -97.3300 251.000 122.0 109.335 3.830 -999.990 -999.990 1.093 ..P WKT 2010 07 19 10 44 55 31.3200 -97.3300 251.000 457.0 93.231 3.830 -999.990 -999.990 0.932 ..P WKT 2010 07 19 10 54 55 31.3200 -97.3300 251.000 30.0 117.133 4.580 -999.990 -999.990 1.171 ..P WKT 2010 07 19 10 59 55 31.3200 -97.3300 251.000 122.0 106.803 4.960 -999.990 -999.990 1.068 ..P WKT 2010 07 19 11 04 55 31.3200 -97.3300 251.000 457.0 90.947 3.720 -999.990 -999.990 0.909 ..P WKT 2010 07 19 11 09 55 31.3200 -97.3300 251.000 30.0 111.302 4.200 -999.990 -999.990 1.113 ..P WKT 2010 07 19 11 14 55 31.3200 -97.3300 251.000 122.0 107.609 3.360 -999.990 -999.990 1.076 ..P WKT 2010 07 19 11 19 55 31.3200 -97.3300 251.000 457.0 89.550 3.390 -999.990 -999.990 0.895 ..P WKT 2010 07 19 11 29 55 31.3200 -97.3300 251.000 30.0 110.910 2.980 -999.990 -999.990 1.109 ..P WKT 2010 07 19 11 34 55 31.3200 -97.3300 251.000 122.0 107.230 3.260 -999.990 -999.990 1.072 ..P WKT 2010 07 19 11 39 55 31.3200 -97.3300 251.000 457.0 94.440 3.120 -999.990 -999.990 0.944 ..P WKT 2010 07 19 11 44 55 31.3200 -97.3300 251.000 30.0 110.088 4.480 -999.990 -999.990 1.101 ..P WKT 2010 07 19 11 49 55 31.3200 -97.3300 251.000 122.0 111.929 4.060 -999.990 -999.990 1.119 ..P WKT 2010 07 19 12 09 55 31.3200 -97.3300 251.000 457.0 91.523 3.030 -999.990 -999.990 0.915 ..P WKT 2010 07 19 12 10 25 31.3200 -97.3300 251.000 457.0 85.085 2.820 -999.990 -999.990 0.851 ..P WKT 2010 07 19 12 10 55 31.3200 -97.3300 251.000 457.0 90.516 3.080 -999.990 -999.990 0.905 ..P WKT 2010 07 19 12 11 25 31.3200 -97.3300 251.000 457.0 87.114 3.610 -999.990 -999.990 0.871 ..P WKT 2010 07 19 12 11 55 31.3200 -97.3300 251.000 457.0 84.817 3.310 -999.990 -999.990 0.848 ..P WKT 2010 07 19 12 12 25 31.3200 -97.3300 251.000 457.0 85.555 2.940 -999.990 -999.990 0.856 ..P WKT 2010 07 19 12 12 55 31.3200 -97.3300 251.000 457.0 90.158 3.410 -999.990 -999.990 0.902 ..P WKT 2010 07 19 12 13 25 31.3200 -97.3300 251.000 457.0 88.688 3.100 -999.990 -999.990 0.887 ..P WKT 2010 07 19 12 13 55 31.3200 -97.3300 251.000 457.0 83.078 3.890 -999.990 -999.990 0.831 ..P WKT 2010 07 19 12 14 25 31.3200 -97.3300 251.000 457.0 88.509 3.940 -999.990 -999.990 0.885 ..P WKT 2010 07 19 12 14 55 31.3200 -97.3300 251.000 457.0 84.279 3.430 -999.990 -999.990 0.843 ..P WKT 2010 07 19 12 19 55 31.3200 -97.3300 251.000 30.0 112.921 7.260 -999.990 -999.990 1.129 ..P WKT 2010 07 19 12 24 55 31.3200 -97.3300 251.000 122.0 107.888 4.500 -999.990 -999.990 1.079 ..P WKT 2010 07 19 12 29 55 31.3200 -97.3300 251.000 457.0 89.599 3.530 -999.990 -999.990 0.896 ..P WKT 2010 07 19 12 34 55 31.3200 -97.3300 251.000 30.0 113.282 3.170 -999.990 -999.990 1.133 ..P WKT 2010 07 19 12 39 55 31.3200 -97.3300 251.000 122.0 106.866 2.900 -999.990 -999.990 1.069 ..P WKT 2010 07 19 12 44 55 31.3200 -97.3300 251.000 457.0 89.260 2.900 -999.990 -999.990 0.893 ..P WKT 2010 07 19 12 54 55 31.3200 -97.3300 251.000 30.0 105.106 3.300 -999.990 -999.990 1.051 ..P WKT 2010 07 19 12 59 55 31.3200 -97.3300 251.000 122.0 102.785 2.890 -999.990 -999.990 1.028 ..P WKT 2010 07 19 13 04 55 31.3200 -97.3300 251.000 457.0 87.057 3.510 -999.990 -999.990 0.871 ..P WKT 2010 07 19 13 09 55 31.3200 -97.3300 251.000 30.0 103.254 3.050 -999.990 -999.990 1.033 ..P WKT 2010 07 19 13 14 55 31.3200 -97.3300 251.000 122.0 110.469 2.760 -999.990 -999.990 1.105 ..P WKT 2010 07 19 13 19 55 31.3200 -97.3300 251.000 457.0 88.376 4.150 -999.990 -999.990 0.884 ..P WKT 2010 07 19 13 29 55 31.3200 -97.3300 251.000 30.0 104.389 2.510 -999.990 -999.990 1.044 ..P WKT 2010 07 19 13 34 55 31.3200 -97.3300 251.000 122.0 103.230 3.440 -999.990 -999.990 1.032 ..P WKT 2010 07 19 13 39 55 31.3200 -97.3300 251.000 457.0 85.197 2.400 -999.990 -999.990 0.852 ..P WKT 2010 07 19 13 44 55 31.3200 -97.3300 251.000 30.0 99.945 2.590 -999.990 -999.990 0.999 ..P WKT 2010 07 19 13 49 55 31.3200 -97.3300 251.000 122.0 101.691 3.390 -999.990 -999.990 1.017 ..P WKT 2010 07 19 13 54 55 31.3200 -97.3300 251.000 457.0 80.467 2.100 -999.990 -999.990 0.805 ..P WKT 2010 07 19 14 04 55 31.3200 -97.3300 251.000 30.0 89.848 4.370 -999.990 -999.990 0.898 ..P WKT 2010 07 19 14 09 55 31.3200 -97.3300 251.000 122.0 103.578 3.450 -999.990 -999.990 1.036 ..P WKT 2010 07 19 14 14 55 31.3200 -97.3300 251.000 457.0 85.468 2.650 -999.990 -999.990 0.855 ..P WKT 2010 07 19 14 19 55 31.3200 -97.3300 251.000 30.0 92.140 2.970 -999.990 -999.990 0.921 ..P WKT 2010 07 19 14 24 55 31.3200 -97.3300 251.000 122.0 102.137 3.290 -999.990 -999.990 1.021 ..P WKT 2010 07 19 14 29 55 31.3200 -97.3300 251.000 457.0 94.268 3.520 -999.990 -999.990 0.943 ..P WKT 2010 07 19 14 39 55 31.3200 -97.3300 251.000 30.0 103.959 3.680 -999.990 -999.990 1.040 ..P WKT 2010 07 19 14 44 55 31.3200 -97.3300 251.000 122.0 109.885 3.220 -999.990 -999.990 1.099 ..P WKT 2010 07 19 14 49 55 31.3200 -97.3300 251.000 457.0 85.186 3.790 -999.990 -999.990 0.852 ..P WKT 2010 07 19 14 54 55 31.3200 -97.3300 251.000 30.0 100.675 2.650 -999.990 -999.990 1.007 ..P WKT 2010 07 19 14 59 55 31.3200 -97.3300 251.000 122.0 107.296 2.380 -999.990 -999.990 1.073 ..P WKT 2010 07 19 15 04 55 31.3200 -97.3300 251.000 457.0 90.351 3.630 -999.990 -999.990 0.904 ..P WKT 2010 07 19 15 14 55 31.3200 -97.3300 251.000 30.0 103.100 1.990 -999.990 -999.990 1.031 ..P WKT 2010 07 19 15 19 55 31.3200 -97.3300 251.000 122.0 108.397 3.380 -999.990 -999.990 1.084 ..P WKT 2010 07 19 15 24 55 31.3200 -97.3300 251.000 457.0 96.496 2.600 -999.990 -999.990 0.965 ..P WKT 2010 07 19 15 29 55 31.3200 -97.3300 251.000 30.0 103.459 2.740 -999.990 -999.990 1.035 ..P WKT 2010 07 19 15 34 55 31.3200 -97.3300 251.000 122.0 104.318 2.190 -999.990 -999.990 1.043 ..P WKT 2010 07 19 15 39 55 31.3200 -97.3300 251.000 457.0 91.024 2.730 -999.990 -999.990 0.910 ..P WKT 2010 07 19 15 49 55 31.3200 -97.3300 251.000 30.0 98.134 2.520 -999.990 -999.990 0.981 ..P WKT 2010 07 19 15 54 55 31.3200 -97.3300 251.000 122.0 104.665 3.990 -999.990 -999.990 1.047 ..P WKT 2010 07 19 15 59 55 31.3200 -97.3300 251.000 457.0 94.538 3.410 -999.990 -999.990 0.945 ..P WKT 2010 07 19 16 04 55 31.3200 -97.3300 251.000 30.0 99.959 2.900 -999.990 -999.990 1.000 ..P WKT 2010 07 19 16 09 55 31.3200 -97.3300 251.000 122.0 105.660 3.410 -999.990 -999.990 1.057 ..P WKT 2010 07 19 16 14 55 31.3200 -97.3300 251.000 457.0 95.251 3.970 -999.990 -999.990 0.953 ..P WKT 2010 07 19 16 24 55 31.3200 -97.3300 251.000 30.0 107.132 3.880 -999.990 -999.990 1.071 ..P WKT 2010 07 19 16 29 55 31.3200 -97.3300 251.000 122.0 116.648 3.290 -999.990 -999.990 1.166 ..P WKT 2010 07 19 16 34 55 31.3200 -97.3300 251.000 457.0 108.378 4.630 -999.990 -999.990 1.084 ..P WKT 2010 07 19 16 39 55 31.3200 -97.3300 251.000 30.0 105.389 3.230 -999.990 -999.990 1.054 ..P WKT 2010 07 19 16 44 55 31.3200 -97.3300 251.000 122.0 108.792 3.920 -999.990 -999.990 1.088 ..P WKT 2010 07 19 16 49 55 31.3200 -97.3300 251.000 457.0 99.684 6.660 -999.990 -999.990 0.997 ..P WKT 2010 07 19 17 04 55 31.3200 -97.3300 251.000 30.0 93.440 3.150 -999.990 -999.990 0.934 ..P WKT 2010 07 19 17 09 55 31.3200 -97.3300 251.000 122.0 105.447 4.720 -999.990 -999.990 1.054 ..P WKT 2010 07 19 17 14 55 31.3200 -97.3300 251.000 457.0 98.536 4.230 -999.990 -999.990 0.985 ..P WKT 2010 07 19 17 19 55 31.3200 -97.3300 251.000 30.0 107.902 4.420 -999.990 -999.990 1.079 ..P WKT 2010 07 19 17 24 55 31.3200 -97.3300 251.000 122.0 108.365 5.020 -999.990 -999.990 1.084 ..P WKT 2010 07 19 17 29 55 31.3200 -97.3300 251.000 457.0 99.503 4.760 -999.990 -999.990 0.995 ..P WKT 2010 07 19 17 39 55 31.3200 -97.3300 251.000 30.0 102.438 4.270 -999.990 -999.990 1.024 ..P WKT 2010 07 19 17 44 55 31.3200 -97.3300 251.000 122.0 106.722 4.440 -999.990 -999.990 1.067 ..P WKT 2010 07 19 17 49 55 31.3200 -97.3300 251.000 457.0 104.323 4.530 -999.990 -999.990 1.043 ..P WKT 2010 07 19 17 54 55 31.3200 -97.3300 251.000 30.0 108.608 4.610 -999.990 -999.990 1.086 ..P WKT 2010 07 19 17 59 55 31.3200 -97.3300 251.000 122.0 111.222 4.840 -999.990 -999.990 1.112 ..P WKT 2010 07 19 18 04 55 31.3200 -97.3300 251.000 457.0 99.210 5.330 -999.990 -999.990 0.992 ..P WKT 2010 07 19 18 14 55 31.3200 -97.3300 251.000 30.0 99.483 4.630 -999.990 -999.990 0.995 ..P WKT 2010 07 19 18 19 55 31.3200 -97.3300 251.000 122.0 109.962 3.890 -999.990 -999.990 1.100 ..P WKT 2010 07 19 18 24 55 31.3200 -97.3300 251.000 457.0 101.906 3.630 -999.990 -999.990 1.019 ..P WKT 2010 07 19 18 29 55 31.3200 -97.3300 251.000 30.0 101.096 3.010 -999.990 -999.990 1.011 ..P WKT 2010 07 19 18 34 55 31.3200 -97.3300 251.000 122.0 110.604 6.310 -999.990 -999.990 1.106 ..P WKT 2010 07 19 18 39 55 31.3200 -97.3300 251.000 457.0 97.805 2.180 -999.990 -999.990 0.978 ..P WKT 2010 07 19 18 49 55 31.3200 -97.3300 251.000 30.0 105.827 1.650 -999.990 -999.990 1.058 ..P WKT 2010 07 19 18 54 55 31.3200 -97.3300 251.000 122.0 108.247 2.020 -999.990 -999.990 1.082 ..P WKT 2010 07 19 18 59 55 31.3200 -97.3300 251.000 457.0 108.434 3.530 -999.990 -999.990 1.084 ..P WKT 2010 07 19 19 04 55 31.3200 -97.3300 251.000 30.0 105.551 3.550 -999.990 -999.990 1.056 ..P WKT 2010 07 19 19 09 55 31.3200 -97.3300 251.000 122.0 114.112 2.290 -999.990 -999.990 1.141 ..P WKT 2010 07 19 19 14 55 31.3200 -97.3300 251.000 457.0 108.717 2.830 -999.990 -999.990 1.087 ..P WKT 2010 07 19 19 24 55 31.3200 -97.3300 251.000 30.0 109.810 2.450 -999.990 -999.990 1.098 ..P WKT 2010 07 19 19 29 55 31.3200 -97.3300 251.000 122.0 113.788 2.580 -999.990 -999.990 1.138 ..P WKT 2010 07 19 19 34 55 31.3200 -97.3300 251.000 457.0 110.505 5.460 -999.990 -999.990 1.105 ..P WKT 2010 07 19 19 39 55 31.3200 -97.3300 251.000 30.0 107.501 3.270 -999.990 -999.990 1.075 ..P WKT 2010 07 19 19 44 55 31.3200 -97.3300 251.000 122.0 107.569 3.030 -999.990 -999.990 1.076 ..P WKT 2010 07 19 19 49 55 31.3200 -97.3300 251.000 457.0 101.490 3.560 -999.990 -999.990 1.015 ..P WKT 2010 07 19 19 59 55 31.3200 -97.3300 251.000 30.0 102.503 3.170 -999.990 -999.990 1.025 ..P WKT 2010 07 19 20 04 55 31.3200 -97.3300 251.000 122.0 102.890 3.130 -999.990 -999.990 1.029 ..P WKT 2010 07 19 20 09 55 31.3200 -97.3300 251.000 457.0 96.847 3.480 -999.990 -999.990 0.968 ..P WKT 2010 07 19 20 14 55 31.3200 -97.3300 251.000 30.0 98.351 4.040 -999.990 -999.990 0.984 ..P WKT 2010 07 19 20 19 55 31.3200 -97.3300 251.000 122.0 111.600 3.870 -999.990 -999.990 1.116 ..P WKT 2010 07 19 20 24 55 31.3200 -97.3300 251.000 457.0 92.971 2.850 -999.990 -999.990 0.930 ..P WKT 2010 07 19 20 34 55 31.3200 -97.3300 251.000 30.0 89.786 4.040 -999.990 -999.990 0.898 ..P WKT 2010 07 19 20 39 55 31.3200 -97.3300 251.000 122.0 105.519 3.040 -999.990 -999.990 1.055 ..P WKT 2010 07 19 20 44 55 31.3200 -97.3300 251.000 457.0 92.156 3.500 -999.990 -999.990 0.922 ..P WKT 2010 07 19 20 49 55 31.3200 -97.3300 251.000 30.0 89.423 3.360 -999.990 -999.990 0.894 ..P WKT 2010 07 19 20 54 55 31.3200 -97.3300 251.000 122.0 101.104 2.600 -999.990 -999.990 1.011 ..P WKT 2010 07 19 20 59 55 31.3200 -97.3300 251.000 457.0 87.455 2.440 -999.990 -999.990 0.875 ..P WKT 2010 07 19 21 09 55 31.3200 -97.3300 251.000 30.0 86.486 2.770 -999.990 -999.990 0.865 ..P WKT 2010 07 19 21 14 55 31.3200 -97.3300 251.000 122.0 95.112 2.120 -999.990 -999.990 0.951 ..P WKT 2010 07 19 21 19 55 31.3200 -97.3300 251.000 457.0 91.418 4.300 -999.990 -999.990 0.914 ..P WKT 2010 07 19 21 24 55 31.3200 -97.3300 251.000 30.0 87.862 1.710 -999.990 -999.990 0.879 ..P WKT 2010 07 19 21 29 55 31.3200 -97.3300 251.000 122.0 90.609 2.380 -999.990 -999.990 0.906 ..P WKT 2010 07 19 21 34 55 31.3200 -97.3300 251.000 457.0 87.612 2.340 -999.990 -999.990 0.876 ..P WKT 2010 07 19 21 44 55 31.3200 -97.3300 251.000 30.0 87.383 2.110 -999.990 -999.990 0.874 ..P WKT 2010 07 19 21 49 55 31.3200 -97.3300 251.000 122.0 100.242 3.380 -999.990 -999.990 1.002 ..P WKT 2010 07 19 21 54 55 31.3200 -97.3300 251.000 457.0 84.650 1.600 -999.990 -999.990 0.847 ..P WKT 2010 07 19 21 59 55 31.3200 -97.3300 251.000 30.0 87.419 2.420 -999.990 -999.990 0.874 ..P WKT 2010 07 19 22 04 55 31.3200 -97.3300 251.000 122.0 94.535 1.550 -999.990 -999.990 0.945 ..P WKT 2010 07 19 22 09 55 31.3200 -97.3300 251.000 457.0 87.069 2.600 -999.990 -999.990 0.871 ..P WKT 2010 07 19 22 19 55 31.3200 -97.3300 251.000 30.0 89.364 2.320 -999.990 -999.990 0.894 ..P WKT 2010 07 19 22 24 55 31.3200 -97.3300 251.000 122.0 94.921 2.280 -999.990 -999.990 0.949 ..P WKT 2010 07 19 22 29 55 31.3200 -97.3300 251.000 457.0 84.766 2.490 -999.990 -999.990 0.848 ..P WKT 2010 07 19 22 34 55 31.3200 -97.3300 251.000 30.0 90.884 3.000 -999.990 -999.990 0.909 ..P WKT 2010 07 19 22 39 55 31.3200 -97.3300 251.000 122.0 100.093 3.200 -999.990 -999.990 1.001 ..P WKT 2010 07 19 22 44 55 31.3200 -97.3300 251.000 457.0 97.232 2.610 -999.990 -999.990 0.972 ..P WKT 2010 07 19 22 54 55 31.3200 -97.3300 251.000 30.0 88.180 2.430 -999.990 -999.990 0.882 ..P WKT 2010 07 19 22 59 55 31.3200 -97.3300 251.000 122.0 95.468 3.190 -999.990 -999.990 0.955 ..P WKT 2010 07 19 23 04 55 31.3200 -97.3300 251.000 457.0 87.028 3.010 -999.990 -999.990 0.870 ..P WKT 2010 07 19 23 09 55 31.3200 -97.3300 251.000 30.0 89.260 2.700 -999.990 -999.990 0.893 ..P WKT 2010 07 19 23 14 55 31.3200 -97.3300 251.000 122.0 98.236 2.630 -999.990 -999.990 0.982 ..P WKT 2010 07 19 23 19 55 31.3200 -97.3300 251.000 457.0 96.537 3.030 -999.990 -999.990 0.965 ..P WKT 2010 07 19 23 29 55 31.3200 -97.3300 251.000 30.0 97.165 2.340 -999.990 -999.990 0.972 ..P WKT 2010 07 19 23 34 55 31.3200 -97.3300 251.000 122.0 100.337 3.180 -999.990 -999.990 1.003 ..P WKT 2010 07 19 23 39 55 31.3200 -97.3300 251.000 457.0 91.701 2.760 -999.990 -999.990 0.917 ..P WKT 2010 07 19 23 44 55 31.3200 -97.3300 251.000 30.0 88.687 2.710 -999.990 -999.990 0.887 ..P WKT 2010 07 19 23 49 55 31.3200 -97.3300 251.000 122.0 102.544 2.600 -999.990 -999.990 1.025 ..P WKT 2010 07 20 00 09 55 31.3200 -97.3300 251.000 457.0 90.062 3.700 -999.990 -999.990 0.901 ..P WKT 2010 07 20 00 10 25 31.3200 -97.3300 251.000 457.0 91.171 2.710 -999.990 -999.990 0.912 ..P WKT 2010 07 20 00 10 55 31.3200 -97.3300 251.000 457.0 94.249 2.110 -999.990 -999.990 0.942 ..P WKT 2010 07 20 00 11 25 31.3200 -97.3300 251.000 457.0 93.670 2.230 -999.990 -999.990 0.937 ..P WKT 2010 07 20 00 11 55 31.3200 -97.3300 251.000 457.0 93.091 3.130 -999.990 -999.990 0.931 ..P WKT 2010 07 20 00 12 25 31.3200 -97.3300 251.000 457.0 94.341 3.950 -999.990 -999.990 0.943 ..P WKT 2010 07 20 00 12 55 31.3200 -97.3300 251.000 457.0 87.716 3.160 -999.990 -999.990 0.877 ..P WKT 2010 07 20 00 13 25 31.3200 -97.3300 251.000 457.0 91.638 2.580 -999.990 -999.990 0.916 ..P WKT 2010 07 20 00 13 55 31.3200 -97.3300 251.000 457.0 95.559 4.920 -999.990 -999.990 0.956 ..P WKT 2010 07 20 00 14 25 31.3200 -97.3300 251.000 457.0 96.669 3.450 -999.990 -999.990 0.967 ..P WKT 2010 07 20 00 14 55 31.3200 -97.3300 251.000 457.0 93.137 2.300 -999.990 -999.990 0.931 ..P WKT 2010 07 20 00 19 55 31.3200 -97.3300 251.000 30.0 87.494 2.830 -999.990 -999.990 0.875 ..P WKT 2010 07 20 00 24 55 31.3200 -97.3300 251.000 122.0 94.788 3.160 -999.990 -999.990 0.948 ..P WKT 2010 07 20 00 29 55 31.3200 -97.3300 251.000 457.0 89.286 3.510 -999.990 -999.990 0.893 ..P WKT 2010 07 20 00 34 55 31.3200 -97.3300 251.000 30.0 91.939 2.280 -999.990 -999.990 0.919 ..P WKT 2010 07 20 00 39 55 31.3200 -97.3300 251.000 122.0 100.076 1.870 -999.990 -999.990 1.001 ..P WKT 2010 07 20 00 44 55 31.3200 -97.3300 251.000 457.0 93.028 2.480 -999.990 -999.990 0.930 ..P WKT 2010 07 20 00 54 55 31.3200 -97.3300 251.000 30.0 98.008 1.820 -999.990 -999.990 0.980 ..P WKT 2010 07 20 00 59 55 31.3200 -97.3300 251.000 122.0 99.069 2.830 -999.990 -999.990 0.991 ..P WKT 2010 07 20 01 04 55 31.3200 -97.3300 251.000 457.0 88.745 3.350 -999.990 -999.990 0.887 ..P WKT 2010 07 20 01 09 55 31.3200 -97.3300 251.000 30.0 93.883 2.660 -999.990 -999.990 0.939 ..P WKT 2010 07 20 01 14 55 31.3200 -97.3300 251.000 122.0 104.361 2.850 -999.990 -999.990 1.044 ..P WKT 2010 07 20 01 19 55 31.3200 -97.3300 251.000 457.0 99.801 2.610 -999.990 -999.990 0.998 ..P WKT 2010 07 20 01 29 55 31.3200 -97.3300 251.000 30.0 101.461 2.270 -999.990 -999.990 1.015 ..P WKT 2010 07 20 01 34 55 31.3200 -97.3300 251.000 122.0 106.557 3.750 -999.990 -999.990 1.066 ..P WKT 2010 07 20 01 39 55 31.3200 -97.3300 251.000 457.0 94.509 6.600 -999.990 -999.990 0.945 ..P WKT 2010 07 20 01 44 55 31.3200 -97.3300 251.000 30.0 99.324 2.660 -999.990 -999.990 0.993 ..P WKT 2010 07 20 01 49 55 31.3200 -97.3300 251.000 122.0 109.478 2.940 -999.990 -999.990 1.095 ..P WKT 2010 07 20 01 54 55 31.3200 -97.3300 251.000 457.0 100.242 3.570 -999.990 -999.990 1.002 ..P WKT 2010 07 20 02 04 55 31.3200 -97.3300 251.000 30.0 103.648 3.950 -999.990 -999.990 1.036 ..P WKT 2010 07 20 02 09 55 31.3200 -97.3300 251.000 122.0 93.811 3.090 -999.990 -999.990 0.938 ..P WKT 2010 07 20 02 14 55 31.3200 -97.3300 251.000 457.0 90.998 4.120 -999.990 -999.990 0.910 ..P WKT 2010 07 20 02 19 55 31.3200 -97.3300 251.000 30.0 101.110 4.030 -999.990 -999.990 1.011 ..P WKT 2010 07 20 02 24 55 31.3200 -97.3300 251.000 122.0 100.264 3.570 -999.990 -999.990 1.003 ..P WKT 2010 07 20 02 29 55 31.3200 -97.3300 251.000 457.0 84.811 3.910 -999.990 -999.990 0.848 ..P WKT 2010 07 20 02 39 55 31.3200 -97.3300 251.000 30.0 98.609 4.010 -999.990 -999.990 0.986 ..P WKT 2010 07 20 02 44 55 31.3200 -97.3300 251.000 122.0 96.400 3.350 -999.990 -999.990 0.964 ..P WKT 2010 07 20 02 49 55 31.3200 -97.3300 251.000 457.0 82.676 3.390 -999.990 -999.990 0.827 ..P WKT 2010 07 20 02 54 55 31.3200 -97.3300 251.000 30.0 95.351 3.510 -999.990 -999.990 0.954 ..P WKT 2010 07 20 02 59 55 31.3200 -97.3300 251.000 122.0 98.478 3.280 -999.990 -999.990 0.985 ..P WKT 2010 07 20 03 04 55 31.3200 -97.3300 251.000 457.0 79.139 2.650 -999.990 -999.990 0.791 ..P WKT 2010 07 20 03 14 55 31.3200 -97.3300 251.000 30.0 96.585 2.730 -999.990 -999.990 0.966 ..P WKT 2010 07 20 03 19 55 31.3200 -97.3300 251.000 122.0 96.862 2.250 -999.990 -999.990 0.969 ..P WKT 2010 07 20 03 24 55 31.3200 -97.3300 251.000 457.0 84.225 2.800 -999.990 -999.990 0.842 ..P WKT 2010 07 20 03 29 55 31.3200 -97.3300 251.000 30.0 99.664 2.980 -999.990 -999.990 0.997 ..P WKT 2010 07 20 03 34 55 31.3200 -97.3300 251.000 122.0 96.574 3.070 -999.990 -999.990 0.966 ..P WKT 2010 07 20 03 39 55 31.3200 -97.3300 251.000 457.0 77.762 2.340 -999.990 -999.990 0.778 ..P WKT 2010 07 20 03 49 55 31.3200 -97.3300 251.000 30.0 92.034 3.640 -999.990 -999.990 0.920 ..P WKT 2010 07 20 03 54 55 31.3200 -97.3300 251.000 122.0 93.956 3.280 -999.990 -999.990 0.940 ..P WKT 2010 07 20 03 59 55 31.3200 -97.3300 251.000 457.0 71.459 2.740 -999.990 -999.990 0.715 ..P WKT 2010 07 20 04 04 55 31.3200 -97.3300 251.000 30.0 96.537 2.900 -999.990 -999.990 0.965 ..P WKT 2010 07 20 04 09 55 31.3200 -97.3300 251.000 122.0 96.634 2.500 -999.990 -999.990 0.966 ..P WKT 2010 07 20 04 14 55 31.3200 -97.3300 251.000 457.0 73.158 3.260 -999.990 -999.990 0.732 ..P WKT 2010 07 20 04 24 55 31.3200 -97.3300 251.000 30.0 92.056 5.310 -999.990 -999.990 0.921 ..P WKT 2010 07 20 04 29 55 31.3200 -97.3300 251.000 122.0 94.017 2.290 -999.990 -999.990 0.940 ..P WKT 2010 07 20 04 34 55 31.3200 -97.3300 251.000 457.0 78.582 2.340 -999.990 -999.990 0.786 ..P WKT 2010 07 20 04 39 55 31.3200 -97.3300 251.000 30.0 98.922 2.470 -999.990 -999.990 0.989 ..P WKT 2010 07 20 04 44 55 31.3200 -97.3300 251.000 122.0 99.200 3.030 -999.990 -999.990 0.992 ..P WKT 2010 07 20 04 49 55 31.3200 -97.3300 251.000 457.0 75.912 1.950 -999.990 -999.990 0.759 ..P WKT 2010 07 20 05 04 55 31.3200 -97.3300 251.000 30.0 95.542 2.490 -999.990 -999.990 0.955 ..P WKT 2010 07 20 05 09 55 31.3200 -97.3300 251.000 122.0 92.734 1.920 -999.990 -999.990 0.927 ..P WKT 2010 07 20 05 14 55 31.3200 -97.3300 251.000 457.0 79.969 2.300 -999.990 -999.990 0.800 ..P WKT 2010 07 20 05 19 55 31.3200 -97.3300 251.000 30.0 90.204 2.010 -999.990 -999.990 0.902 ..P WKT 2010 07 20 05 24 55 31.3200 -97.3300 251.000 122.0 95.110 2.370 -999.990 -999.990 0.951 ..P WKT 2010 07 20 05 29 55 31.3200 -97.3300 251.000 457.0 73.933 1.460 -999.990 -999.990 0.739 ..P WKT 2010 07 20 05 39 55 31.3200 -97.3300 251.000 30.0 95.342 1.840 -999.990 -999.990 0.953 ..P WKT 2010 07 20 05 44 55 31.3200 -97.3300 251.000 122.0 99.646 2.230 -999.990 -999.990 0.996 ..P WKT 2010 07 20 05 49 55 31.3200 -97.3300 251.000 457.0 82.359 2.190 -999.990 -999.990 0.824 ..P WKT 2010 07 20 05 54 55 31.3200 -97.3300 251.000 30.0 101.102 3.180 -999.990 -999.990 1.011 ..P WKT 2010 07 20 05 59 55 31.3200 -97.3300 251.000 122.0 93.490 2.960 -999.990 -999.990 0.935 ..P WKT 2010 07 20 06 04 55 31.3200 -97.3300 251.000 457.0 82.793 2.600 -999.990 -999.990 0.828 ..P WKT 2010 07 20 06 14 55 31.3200 -97.3300 251.000 30.0 103.614 2.320 -999.990 -999.990 1.036 ..P WKT 2010 07 20 06 19 55 31.3200 -97.3300 251.000 122.0 94.760 4.590 -999.990 -999.990 0.948 ..P WKT 2010 07 20 06 24 55 31.3200 -97.3300 251.000 457.0 80.582 2.880 -999.990 -999.990 0.806 ..P WKT 2010 07 20 06 29 55 31.3200 -97.3300 251.000 30.0 94.995 3.310 -999.990 -999.990 0.950 ..P WKT 2010 07 20 06 34 55 31.3200 -97.3300 251.000 122.0 93.430 3.070 -999.990 -999.990 0.934 ..P WKT 2010 07 20 06 39 55 31.3200 -97.3300 251.000 457.0 80.655 2.820 -999.990 -999.990 0.807 ..P WKT 2010 07 20 06 49 55 31.3200 -97.3300 251.000 30.0 93.182 2.820 -999.990 -999.990 0.932 ..P WKT 2010 07 20 06 54 55 31.3200 -97.3300 251.000 122.0 83.171 4.600 -999.990 -999.990 0.832 ..P WKT 2010 07 20 06 59 55 31.3200 -97.3300 251.000 457.0 71.761 3.190 -999.990 -999.990 0.718 ..P WKT 2010 07 20 07 04 55 31.3200 -97.3300 251.000 30.0 82.207 4.730 -999.990 -999.990 0.822 ..P WKT 2010 07 20 07 09 55 31.3200 -97.3300 251.000 122.0 81.164 3.600 -999.990 -999.990 0.812 ..P WKT 2010 07 20 07 14 55 31.3200 -97.3300 251.000 457.0 70.595 2.690 -999.990 -999.990 0.706 ..P WKT 2010 07 20 07 24 55 31.3200 -97.3300 251.000 30.0 80.617 3.020 -999.990 -999.990 0.806 ..P WKT 2010 07 20 07 29 55 31.3200 -97.3300 251.000 122.0 85.798 4.100 -999.990 -999.990 0.858 ..P WKT 2010 07 20 07 34 55 31.3200 -97.3300 251.000 457.0 77.251 4.160 -999.990 -999.990 0.773 ..P WKT 2010 07 20 07 39 55 31.3200 -97.3300 251.000 30.0 85.794 3.940 -999.990 -999.990 0.858 ..P WKT 2010 07 20 07 44 55 31.3200 -97.3300 251.000 122.0 90.133 3.280 -999.990 -999.990 0.901 ..P WKT 2010 07 20 07 49 55 31.3200 -97.3300 251.000 457.0 75.705 3.090 -999.990 -999.990 0.757 ..P WKT 2010 07 20 07 59 55 31.3200 -97.3300 251.000 30.0 83.804 2.390 -999.990 -999.990 0.838 ..P WKT 2010 07 20 08 04 55 31.3200 -97.3300 251.000 122.0 92.463 4.020 -999.990 -999.990 0.925 ..P WKT 2010 07 20 08 09 55 31.3200 -97.3300 251.000 457.0 79.559 4.710 -999.990 -999.990 0.796 ..P WKT 2010 07 20 08 14 55 31.3200 -97.3300 251.000 30.0 86.258 4.890 -999.990 -999.990 0.863 ..P WKT 2010 07 20 08 19 55 31.3200 -97.3300 251.000 122.0 88.195 3.030 -999.990 -999.990 0.882 ..P WKT 2010 07 20 08 24 55 31.3200 -97.3300 251.000 457.0 77.113 2.790 -999.990 -999.990 0.771 ..P WKT 2010 07 20 08 34 55 31.3200 -97.3300 251.000 30.0 86.769 3.110 -999.990 -999.990 0.868 ..P WKT 2010 07 20 08 39 55 31.3200 -97.3300 251.000 122.0 85.107 1.780 -999.990 -999.990 0.851 ..P WKT 2010 07 20 08 44 55 31.3200 -97.3300 251.000 457.0 78.125 2.860 -999.990 -999.990 0.781 ..P WKT 2010 07 20 08 49 55 31.3200 -97.3300 251.000 30.0 85.422 2.410 -999.990 -999.990 0.854 ..P WKT 2010 07 20 08 54 55 31.3200 -97.3300 251.000 122.0 83.340 2.490 -999.990 -999.990 0.833 ..P WKT 2010 07 20 08 59 55 31.3200 -97.3300 251.000 457.0 83.218 2.830 -999.990 -999.990 0.832 ..P WKT 2010 07 20 09 09 55 31.3200 -97.3300 251.000 30.0 79.675 1.720 -999.990 -999.990 0.797 ..P WKT 2010 07 20 09 14 55 31.3200 -97.3300 251.000 122.0 88.150 2.580 -999.990 -999.990 0.882 ..P WKT 2010 07 20 09 19 55 31.3200 -97.3300 251.000 457.0 82.070 4.240 -999.990 -999.990 0.821 ..P WKT 2010 07 20 09 24 55 31.3200 -97.3300 251.000 30.0 82.707 2.190 -999.990 -999.990 0.827 ..P WKT 2010 07 20 09 29 55 31.3200 -97.3300 251.000 122.0 87.683 4.470 -999.990 -999.990 0.877 ..P WKT 2010 07 20 09 34 55 31.3200 -97.3300 251.000 457.0 79.505 2.860 -999.990 -999.990 0.795 ..P WKT 2010 07 20 09 44 55 31.3200 -97.3300 251.000 30.0 89.015 3.930 -999.990 -999.990 0.890 ..P WKT 2010 07 20 09 49 55 31.3200 -97.3300 251.000 122.0 87.673 3.240 -999.990 -999.990 0.877 ..P WKT 2010 07 20 09 54 55 31.3200 -97.3300 251.000 457.0 74.861 2.680 -999.990 -999.990 0.749 ..P WKT 2010 07 20 09 59 55 31.3200 -97.3300 251.000 30.0 87.788 3.390 -999.990 -999.990 0.878 ..P WKT 2010 07 20 10 04 55 31.3200 -97.3300 251.000 122.0 89.525 3.050 -999.990 -999.990 0.895 ..P WKT 2010 07 20 10 09 55 31.3200 -97.3300 251.000 457.0 102.730 2.810 -999.990 -999.990 1.027 ..P WKT 2010 07 20 10 19 55 31.3200 -97.3300 251.000 30.0 85.801 2.370 -999.990 -999.990 0.858 ..P WKT 2010 07 20 10 24 55 31.3200 -97.3300 251.000 122.0 88.396 3.080 -999.990 -999.990 0.884 ..P WKT 2010 07 20 10 29 55 31.3200 -97.3300 251.000 457.0 87.634 2.050 -999.990 -999.990 0.876 ..P WKT 2010 07 20 10 34 55 31.3200 -97.3300 251.000 30.0 93.026 2.930 -999.990 -999.990 0.930 ..P WKT 2010 07 20 10 39 55 31.3200 -97.3300 251.000 122.0 98.696 2.910 -999.990 -999.990 0.987 ..P WKT 2010 07 20 10 44 55 31.3200 -97.3300 251.000 457.0 125.900 2.680 -999.990 -999.990 1.259 ..P WKT 2010 07 20 10 54 55 31.3200 -97.3300 251.000 30.0 98.648 2.470 -999.990 -999.990 0.986 ..P WKT 2010 07 20 10 59 55 31.3200 -97.3300 251.000 122.0 97.886 4.360 -999.990 -999.990 0.979 ..P WKT 2010 07 20 11 04 55 31.3200 -97.3300 251.000 457.0 72.240 1.560 -999.990 -999.990 0.722 ..P WKT 2010 07 20 11 09 55 31.3200 -97.3300 251.000 30.0 93.288 3.440 -999.990 -999.990 0.933 ..P WKT 2010 07 20 11 14 55 31.3200 -97.3300 251.000 122.0 90.010 1.400 -999.990 -999.990 0.900 ..P WKT 2010 07 20 11 19 55 31.3200 -97.3300 251.000 457.0 79.184 3.390 -999.990 -999.990 0.792 ..P WKT 2010 07 20 11 29 55 31.3200 -97.3300 251.000 30.0 95.474 2.460 -999.990 -999.990 0.955 ..P WKT 2010 07 20 11 34 55 31.3200 -97.3300 251.000 122.0 100.223 2.270 -999.990 -999.990 1.002 ..P WKT 2010 07 20 11 39 55 31.3200 -97.3300 251.000 457.0 81.213 2.540 -999.990 -999.990 0.812 ..P WKT 2010 07 20 11 44 55 31.3200 -97.3300 251.000 30.0 91.133 3.510 -999.990 -999.990 0.911 ..P WKT 2010 07 20 11 49 55 31.3200 -97.3300 251.000 122.0 99.375 2.120 -999.990 -999.990 0.994 ..P WKT 2010 07 20 12 09 55 31.3200 -97.3300 251.000 457.0 72.288 2.190 -999.990 -999.990 0.723 ..P WKT 2010 07 20 12 10 25 31.3200 -97.3300 251.000 457.0 72.685 1.480 -999.990 -999.990 0.727 ..P WKT 2010 07 20 12 10 55 31.3200 -97.3300 251.000 457.0 68.051 2.720 -999.990 -999.990 0.681 ..P WKT 2010 07 20 12 11 25 31.3200 -97.3300 251.000 457.0 72.781 2.680 -999.990 -999.990 0.728 ..P WKT 2010 07 20 12 11 55 31.3200 -97.3300 251.000 457.0 73.737 2.240 -999.990 -999.990 0.737 ..P WKT 2010 07 20 12 12 25 31.3200 -97.3300 251.000 457.0 76.931 1.820 -999.990 -999.990 0.769 ..P WKT 2010 07 20 12 12 55 31.3200 -97.3300 251.000 457.0 79.704 3.870 -999.990 -999.990 0.797 ..P WKT 2010 07 20 12 13 25 31.3200 -97.3300 251.000 457.0 71.575 3.180 -999.990 -999.990 0.716 ..P WKT 2010 07 20 12 13 55 31.3200 -97.3300 251.000 457.0 73.930 1.750 -999.990 -999.990 0.739 ..P WKT 2010 07 20 12 14 25 31.3200 -97.3300 251.000 457.0 76.144 2.490 -999.990 -999.990 0.761 ..P WKT 2010 07 20 12 14 55 31.3200 -97.3300 251.000 457.0 71.510 1.910 -999.990 -999.990 0.715 ..P WKT 2010 07 20 12 19 55 31.3200 -97.3300 251.000 30.0 90.582 2.800 -999.990 -999.990 0.906 ..P WKT 2010 07 20 12 24 55 31.3200 -97.3300 251.000 122.0 91.484 3.310 -999.990 -999.990 0.915 ..P WKT 2010 07 20 12 29 55 31.3200 -97.3300 251.000 457.0 74.629 4.210 -999.990 -999.990 0.746 ..P WKT 2010 07 20 12 34 55 31.3200 -97.3300 251.000 30.0 90.910 3.200 -999.990 -999.990 0.909 ..P WKT 2010 07 20 12 39 55 31.3200 -97.3300 251.000 122.0 93.630 2.990 -999.990 -999.990 0.936 ..P WKT 2010 07 20 12 44 55 31.3200 -97.3300 251.000 457.0 72.016 2.720 -999.990 -999.990 0.720 ..P WKT 2010 07 20 12 54 55 31.3200 -97.3300 251.000 30.0 87.827 3.010 -999.990 -999.990 0.878 ..P WKT 2010 07 20 12 59 55 31.3200 -97.3300 251.000 122.0 91.268 3.840 -999.990 -999.990 0.913 ..P WKT 2010 07 20 13 04 55 31.3200 -97.3300 251.000 457.0 71.627 4.180 -999.990 -999.990 0.716 ..P WKT 2010 07 20 13 09 55 31.3200 -97.3300 251.000 30.0 92.837 4.310 -999.990 -999.990 0.928 ..P WKT 2010 07 20 13 14 55 31.3200 -97.3300 251.000 122.0 95.861 4.000 -999.990 -999.990 0.959 ..P WKT 2010 07 20 13 19 55 31.3200 -97.3300 251.000 457.0 81.253 3.790 -999.990 -999.990 0.813 ..P WKT 2010 07 20 13 29 55 31.3200 -97.3300 251.000 30.0 106.314 4.900 -999.990 -999.990 1.063 ..P WKT 2010 07 20 13 34 55 31.3200 -97.3300 251.000 122.0 102.601 3.230 -999.990 -999.990 1.026 ..P WKT 2010 07 20 13 39 55 31.3200 -97.3300 251.000 457.0 76.350 5.200 -999.990 -999.990 0.763 ..P WKT 2010 07 20 13 44 55 31.3200 -97.3300 251.000 30.0 97.694 3.000 -999.990 -999.990 0.977 ..P WKT 2010 07 20 13 49 55 31.3200 -97.3300 251.000 122.0 104.200 4.040 -999.990 -999.990 1.042 ..P WKT 2010 07 20 13 54 55 31.3200 -97.3300 251.000 457.0 84.383 1.750 -999.990 -999.990 0.844 ..P WKT 2010 07 20 14 04 55 31.3200 -97.3300 251.000 30.0 94.635 1.950 -999.990 -999.990 0.946 ..P WKT 2010 07 20 14 09 55 31.3200 -97.3300 251.000 122.0 95.581 2.000 -999.990 -999.990 0.956 ..P WKT 2010 07 20 14 14 55 31.3200 -97.3300 251.000 457.0 80.839 2.920 -999.990 -999.990 0.808 ..P WKT 2010 07 20 14 19 55 31.3200 -97.3300 251.000 30.0 89.909 3.150 -999.990 -999.990 0.899 ..P WKT 2010 07 20 14 24 55 31.3200 -97.3300 251.000 122.0 90.574 3.300 -999.990 -999.990 0.906 ..P WKT 2010 07 20 14 29 55 31.3200 -97.3300 251.000 457.0 80.872 3.320 -999.990 -999.990 0.809 ..P WKT 2010 07 20 14 39 55 31.3200 -97.3300 251.000 30.0 83.242 1.890 -999.990 -999.990 0.832 ..P WKT 2010 07 20 14 44 55 31.3200 -97.3300 251.000 122.0 89.433 2.770 -999.990 -999.990 0.894 ..P WKT 2010 07 20 14 49 55 31.3200 -97.3300 251.000 457.0 77.965 3.470 -999.990 -999.990 0.780 ..P WKT 2010 07 20 14 54 55 31.3200 -97.3300 251.000 30.0 84.156 3.600 -999.990 -999.990 0.842 ..P WKT 2010 07 20 14 59 55 31.3200 -97.3300 251.000 122.0 91.751 3.060 -999.990 -999.990 0.918 ..P WKT 2010 07 20 15 04 55 31.3200 -97.3300 251.000 457.0 81.682 3.660 -999.990 -999.990 0.817 ..P WKT 2010 07 20 15 14 55 31.3200 -97.3300 251.000 30.0 90.225 4.440 -999.990 -999.990 0.902 ..P WKT 2010 07 20 15 19 55 31.3200 -97.3300 251.000 122.0 96.781 3.360 -999.990 -999.990 0.968 ..P WKT 2010 07 20 15 24 55 31.3200 -97.3300 251.000 457.0 85.105 3.540 -999.990 -999.990 0.851 ..P WKT 2010 07 20 15 29 55 31.3200 -97.3300 251.000 30.0 87.735 3.370 -999.990 -999.990 0.877 ..P WKT 2010 07 20 15 34 55 31.3200 -97.3300 251.000 122.0 93.450 3.840 -999.990 -999.990 0.934 ..P WKT 2010 07 20 15 39 55 31.3200 -97.3300 251.000 457.0 84.858 2.420 -999.990 -999.990 0.849 ..P WKT 2010 07 20 15 49 55 31.3200 -97.3300 251.000 30.0 83.505 2.720 -999.990 -999.990 0.835 ..P WKT 2010 07 20 15 54 55 31.3200 -97.3300 251.000 122.0 93.973 2.270 -999.990 -999.990 0.940 ..P WKT 2010 07 20 15 59 55 31.3200 -97.3300 251.000 457.0 82.131 1.950 -999.990 -999.990 0.821 ..P WKT 2010 07 20 16 04 55 31.3200 -97.3300 251.000 30.0 84.039 2.850 -999.990 -999.990 0.840 ..P WKT 2010 07 20 16 09 55 31.3200 -97.3300 251.000 122.0 88.476 2.820 -999.990 -999.990 0.885 ..P WKT 2010 07 20 16 14 55 31.3200 -97.3300 251.000 457.0 76.910 3.550 -999.990 -999.990 0.769 ..P WKT 2010 07 20 16 24 55 31.3200 -97.3300 251.000 30.0 87.568 2.790 -999.990 -999.990 0.876 ..P WKT 2010 07 20 16 29 55 31.3200 -97.3300 251.000 122.0 87.472 2.920 -999.990 -999.990 0.875 ..P WKT 2010 07 20 16 34 55 31.3200 -97.3300 251.000 457.0 84.288 2.630 -999.990 -999.990 0.843 ..P WKT 2010 07 20 16 39 55 31.3200 -97.3300 251.000 30.0 83.911 2.370 -999.990 -999.990 0.839 ..P WKT 2010 07 20 16 44 55 31.3200 -97.3300 251.000 122.0 90.135 2.850 -999.990 -999.990 0.901 ..P WKT 2010 07 20 16 49 55 31.3200 -97.3300 251.000 457.0 79.787 2.650 -999.990 -999.990 0.798 ..P WKT 2010 07 20 17 04 55 31.3200 -97.3300 251.000 30.0 84.506 2.980 -999.990 -999.990 0.845 ..P WKT 2010 07 20 17 09 55 31.3200 -97.3300 251.000 122.0 86.704 2.580 -999.990 -999.990 0.867 ..P WKT 2010 07 20 17 14 55 31.3200 -97.3300 251.000 457.0 81.454 2.640 -999.990 -999.990 0.815 ..P WKT 2010 07 20 17 19 55 31.3200 -97.3300 251.000 30.0 77.609 4.360 -999.990 -999.990 0.776 ..P WKT 2010 07 20 17 24 55 31.3200 -97.3300 251.000 122.0 84.445 3.000 -999.990 -999.990 0.844 ..P WKT 2010 07 20 17 29 55 31.3200 -97.3300 251.000 457.0 80.599 2.760 -999.990 -999.990 0.806 ..P WKT 2010 07 20 17 39 55 31.3200 -97.3300 251.000 30.0 79.628 2.140 -999.990 -999.990 0.796 ..P WKT 2010 07 20 17 44 55 31.3200 -97.3300 251.000 122.0 93.190 2.590 -999.990 -999.990 0.932 ..P WKT 2010 07 20 17 49 55 31.3200 -97.3300 251.000 457.0 87.069 3.140 -999.990 -999.990 0.871 ..P WKT 2010 07 20 17 54 55 31.3200 -97.3300 251.000 30.0 77.291 4.550 -999.990 -999.990 0.773 ..P WKT 2010 07 20 17 59 55 31.3200 -97.3300 251.000 122.0 84.949 2.120 -999.990 -999.990 0.849 ..P WKT 2010 07 20 18 04 55 31.3200 -97.3300 251.000 457.0 79.107 2.190 -999.990 -999.990 0.791 ..P WKT 2010 07 20 18 14 55 31.3200 -97.3300 251.000 30.0 85.586 2.190 -999.990 -999.990 0.856 ..P WKT 2010 07 20 18 19 55 31.3200 -97.3300 251.000 122.0 91.157 2.350 -999.990 -999.990 0.912 ..P WKT 2010 07 20 18 24 55 31.3200 -97.3300 251.000 457.0 79.285 2.800 -999.990 -999.990 0.793 ..P WKT 2010 07 20 18 29 55 31.3200 -97.3300 251.000 30.0 84.857 4.120 -999.990 -999.990 0.849 ..P WKT 2010 07 20 18 34 55 31.3200 -97.3300 251.000 122.0 90.711 2.920 -999.990 -999.990 0.907 ..P WKT 2010 07 20 18 39 55 31.3200 -97.3300 251.000 457.0 84.183 4.060 -999.990 -999.990 0.842 ..P WKT 2010 07 20 18 49 55 31.3200 -97.3300 251.000 30.0 85.962 3.670 -999.990 -999.990 0.860 ..P WKT 2010 07 20 18 54 55 31.3200 -97.3300 251.000 122.0 83.574 3.040 -999.990 -999.990 0.836 ..P WKT 2010 07 20 18 59 55 31.3200 -97.3300 251.000 457.0 80.623 3.980 -999.990 -999.990 0.806 ..P WKT 2010 07 20 19 04 55 31.3200 -97.3300 251.000 30.0 79.078 4.220 -999.990 -999.990 0.791 ..P WKT 2010 07 20 19 09 55 31.3200 -97.3300 251.000 122.0 93.020 4.160 -999.990 -999.990 0.930 ..P WKT 2010 07 20 19 14 55 31.3200 -97.3300 251.000 457.0 81.621 2.640 -999.990 -999.990 0.816 ..P WKT 2010 07 20 19 24 55 31.3200 -97.3300 251.000 30.0 77.989 2.810 -999.990 -999.990 0.780 ..P WKT 2010 07 20 19 29 55 31.3200 -97.3300 251.000 122.0 88.858 2.710 -999.990 -999.990 0.889 ..P WKT 2010 07 20 19 34 55 31.3200 -97.3300 251.000 457.0 80.714 2.720 -999.990 -999.990 0.807 ..P WKT 2010 07 20 19 39 55 31.3200 -97.3300 251.000 30.0 85.950 3.630 -999.990 -999.990 0.860 ..P WKT 2010 07 20 19 44 55 31.3200 -97.3300 251.000 122.0 92.878 3.420 -999.990 -999.990 0.929 ..P WKT 2010 07 20 19 49 55 31.3200 -97.3300 251.000 457.0 82.760 3.390 -999.990 -999.990 0.828 ..P WKT 2010 07 20 19 59 55 31.3200 -97.3300 251.000 30.0 87.983 3.570 -999.990 -999.990 0.880 ..P WKT 2010 07 20 20 04 55 31.3200 -97.3300 251.000 122.0 92.054 4.010 -999.990 -999.990 0.921 ..P WKT 2010 07 20 20 09 55 31.3200 -97.3300 251.000 457.0 83.161 3.750 -999.990 -999.990 0.832 ..P WKT 2010 07 20 20 14 55 31.3200 -97.3300 251.000 30.0 86.669 4.110 -999.990 -999.990 0.867 ..P WKT 2010 07 20 20 19 55 31.3200 -97.3300 251.000 122.0 88.627 3.580 -999.990 -999.990 0.886 ..P WKT 2010 07 20 20 24 55 31.3200 -97.3300 251.000 457.0 84.242 3.860 -999.990 -999.990 0.842 ..P WKT 2010 07 20 20 34 55 31.3200 -97.3300 251.000 30.0 81.815 3.060 -999.990 -999.990 0.818 ..P WKT 2010 07 20 20 39 55 31.3200 -97.3300 251.000 122.0 90.119 3.150 -999.990 -999.990 0.901 ..P WKT 2010 07 20 20 44 55 31.3200 -97.3300 251.000 457.0 83.053 3.470 -999.990 -999.990 0.831 ..P WKT 2010 07 20 20 49 55 31.3200 -97.3300 251.000 30.0 86.140 3.980 -999.990 -999.990 0.861 ..P WKT 2010 07 20 20 54 55 31.3200 -97.3300 251.000 122.0 91.907 3.260 -999.990 -999.990 0.919 ..P WKT 2010 07 20 20 59 55 31.3200 -97.3300 251.000 457.0 87.943 3.060 -999.990 -999.990 0.879 ..P WKT 2010 07 20 21 09 55 31.3200 -97.3300 251.000 30.0 90.392 3.510 -999.990 -999.990 0.904 ..P WKT 2010 07 20 21 14 55 31.3200 -97.3300 251.000 122.0 100.899 4.110 -999.990 -999.990 1.009 ..P WKT 2010 07 20 21 19 55 31.3200 -97.3300 251.000 457.0 94.193 3.420 -999.990 -999.990 0.942 ..P WKT 2010 07 20 21 24 55 31.3200 -97.3300 251.000 30.0 89.038 4.640 -999.990 -999.990 0.890 ..P WKT 2010 07 20 21 29 55 31.3200 -97.3300 251.000 122.0 92.773 4.660 -999.990 -999.990 0.928 ..P WKT 2010 07 20 21 34 55 31.3200 -97.3300 251.000 457.0 89.028 4.250 -999.990 -999.990 0.890 ..P WKT 2010 07 20 21 44 55 31.3200 -97.3300 251.000 30.0 99.021 5.110 -999.990 -999.990 0.990 ..P WKT 2010 07 20 21 49 55 31.3200 -97.3300 251.000 122.0 103.161 4.210 -999.990 -999.990 1.032 ..P WKT 2010 07 20 21 54 55 31.3200 -97.3300 251.000 457.0 88.948 4.220 -999.990 -999.990 0.889 ..P WKT 2010 07 20 21 59 55 31.3200 -97.3300 251.000 30.0 93.370 5.070 -999.990 -999.990 0.934 ..P WKT 2010 07 20 22 04 55 31.3200 -97.3300 251.000 122.0 110.503 4.600 -999.990 -999.990 1.105 ..P WKT 2010 07 20 22 09 55 31.3200 -97.3300 251.000 457.0 101.653 4.190 -999.990 -999.990 1.017 ..P WKT 2010 07 20 22 19 55 31.3200 -97.3300 251.000 30.0 101.586 4.920 -999.990 -999.990 1.016 ..P WKT 2010 07 20 22 24 55 31.3200 -97.3300 251.000 122.0 100.199 4.590 -999.990 -999.990 1.002 ..P WKT 2010 07 20 22 29 55 31.3200 -97.3300 251.000 457.0 97.400 5.280 -999.990 -999.990 0.974 ..P WKT 2010 07 20 22 34 55 31.3200 -97.3300 251.000 30.0 91.775 4.690 -999.990 -999.990 0.918 ..P WKT 2010 07 20 22 39 55 31.3200 -97.3300 251.000 122.0 99.996 3.570 -999.990 -999.990 1.000 ..P WKT 2010 07 20 22 44 55 31.3200 -97.3300 251.000 457.0 94.935 4.360 -999.990 -999.990 0.949 ..P WKT 2010 07 20 22 54 55 31.3200 -97.3300 251.000 30.0 90.747 3.490 -999.990 -999.990 0.907 ..P WKT 2010 07 20 22 59 55 31.3200 -97.3300 251.000 122.0 100.667 3.910 -999.990 -999.990 1.007 ..P WKT 2010 07 20 23 04 55 31.3200 -97.3300 251.000 457.0 89.951 4.620 -999.990 -999.990 0.900 ..P WKT 2010 07 20 23 09 55 31.3200 -97.3300 251.000 30.0 95.913 3.650 -999.990 -999.990 0.959 ..P WKT 2010 07 20 23 14 55 31.3200 -97.3300 251.000 122.0 102.443 5.190 -999.990 -999.990 1.024 ..P WKT 2010 07 20 23 19 55 31.3200 -97.3300 251.000 457.0 86.350 3.570 -999.990 -999.990 0.863 ..P WKT 2010 07 20 23 29 55 31.3200 -97.3300 251.000 30.0 98.681 4.370 -999.990 -999.990 0.987 ..P WKT 2010 07 20 23 34 55 31.3200 -97.3300 251.000 122.0 105.614 3.950 -999.990 -999.990 1.056 ..P WKT 2010 07 20 23 39 55 31.3200 -97.3300 251.000 457.0 97.698 4.990 -999.990 -999.990 0.977 ..P WKT 2010 07 20 23 44 55 31.3200 -97.3300 251.000 30.0 103.926 4.710 -999.990 -999.990 1.039 ..P WKT 2010 07 20 23 49 55 31.3200 -97.3300 251.000 122.0 97.847 4.270 -999.990 -999.990 0.978 ..P WKT 2010 07 21 00 09 55 31.3200 -97.3300 251.000 457.0 87.899 4.810 -999.990 -999.990 0.879 ..P WKT 2010 07 21 00 10 25 31.3200 -97.3300 251.000 457.0 92.094 5.130 -999.990 -999.990 0.921 ..P WKT 2010 07 21 00 10 55 31.3200 -97.3300 251.000 457.0 90.914 5.350 -999.990 -999.990 0.909 ..P WKT 2010 07 21 00 11 25 31.3200 -97.3300 251.000 457.0 95.957 4.670 -999.990 -999.990 0.960 ..P WKT 2010 07 21 00 11 55 31.3200 -97.3300 251.000 457.0 90.675 5.200 -999.990 -999.990 0.907 ..P WKT 2010 07 21 00 12 25 31.3200 -97.3300 251.000 457.0 90.768 5.330 -999.990 -999.990 0.908 ..P WKT 2010 07 21 00 12 55 31.3200 -97.3300 251.000 457.0 93.690 4.580 -999.990 -999.990 0.937 ..P WKT 2010 07 21 00 13 25 31.3200 -97.3300 251.000 457.0 87.983 5.010 -999.990 -999.990 0.880 ..P WKT 2010 07 21 00 13 55 31.3200 -97.3300 251.000 457.0 90.339 5.490 -999.990 -999.990 0.903 ..P WKT 2010 07 21 00 14 25 31.3200 -97.3300 251.000 457.0 93.968 4.570 -999.990 -999.990 0.940 ..P WKT 2010 07 21 00 14 55 31.3200 -97.3300 251.000 457.0 88.403 4.860 -999.990 -999.990 0.884 ..P WKT 2010 07 21 00 19 55 31.3200 -97.3300 251.000 30.0 94.846 4.240 -999.990 -999.990 0.948 ..P WKT 2010 07 21 00 24 55 31.3200 -97.3300 251.000 122.0 95.067 5.100 -999.990 -999.990 0.951 ..P WKT 2010 07 21 00 29 55 31.3200 -97.3300 251.000 457.0 90.903 4.070 -999.990 -999.990 0.909 ..P WKT 2010 07 21 00 34 55 31.3200 -97.3300 251.000 30.0 99.889 3.960 -999.990 -999.990 0.999 ..P WKT 2010 07 21 00 39 55 31.3200 -97.3300 251.000 122.0 102.653 4.490 -999.990 -999.990 1.027 ..P WKT 2010 07 21 00 44 55 31.3200 -97.3300 251.000 457.0 100.894 3.750 -999.990 -999.990 1.009 ..P WKT 2010 07 21 00 54 55 31.3200 -97.3300 251.000 30.0 96.979 4.190 -999.990 -999.990 0.970 ..P WKT 2010 07 21 00 59 55 31.3200 -97.3300 251.000 122.0 102.030 3.740 -999.990 -999.990 1.020 ..P WKT 2010 07 21 01 04 55 31.3200 -97.3300 251.000 457.0 91.820 4.190 -999.990 -999.990 0.918 ..P WKT 2010 07 21 01 09 55 31.3200 -97.3300 251.000 30.0 101.533 3.750 -999.990 -999.990 1.015 ..P WKT 2010 07 21 01 14 55 31.3200 -97.3300 251.000 122.0 101.779 7.850 -999.990 -999.990 1.018 ..P WKT 2010 07 21 01 19 55 31.3200 -97.3300 251.000 457.0 98.211 3.820 -999.990 -999.990 0.982 ..P WKT 2010 07 21 01 29 55 31.3200 -97.3300 251.000 30.0 107.602 3.840 -999.990 -999.990 1.076 ..P WKT 2010 07 21 01 34 55 31.3200 -97.3300 251.000 122.0 99.798 3.770 -999.990 -999.990 0.998 ..P WKT 2010 07 21 01 39 55 31.3200 -97.3300 251.000 457.0 94.255 4.410 -999.990 -999.990 0.943 ..P WKT 2010 07 21 01 44 55 31.3200 -97.3300 251.000 30.0 95.490 3.840 -999.990 -999.990 0.955 ..P WKT 2010 07 21 01 49 55 31.3200 -97.3300 251.000 122.0 93.054 3.950 -999.990 -999.990 0.931 ..P WKT 2010 07 21 01 54 55 31.3200 -97.3300 251.000 457.0 86.102 4.030 -999.990 -999.990 0.861 ..P WKT 2010 07 21 02 04 55 31.3200 -97.3300 251.000 30.0 83.654 4.550 -999.990 -999.990 0.837 ..P WKT 2010 07 21 02 09 55 31.3200 -97.3300 251.000 122.0 92.953 4.360 -999.990 -999.990 0.930 ..P WKT 2010 07 21 02 14 55 31.3200 -97.3300 251.000 457.0 92.938 4.930 -999.990 -999.990 0.929 ..P WKT 2010 07 21 02 19 55 31.3200 -97.3300 251.000 30.0 90.383 4.670 -999.990 -999.990 0.904 ..P WKT 2010 07 21 02 24 55 31.3200 -97.3300 251.000 122.0 108.425 5.440 -999.990 -999.990 1.084 ..P WKT 2010 07 21 02 29 55 31.3200 -97.3300 251.000 457.0 113.486 5.000 -999.990 -999.990 1.135 ..P WKT 2010 07 21 02 39 55 31.3200 -97.3300 251.000 30.0 111.639 5.200 -999.990 -999.990 1.116 ..P WKT 2010 07 21 02 44 55 31.3200 -97.3300 251.000 122.0 117.141 4.600 -999.990 -999.990 1.171 ..P WKT 2010 07 21 02 49 55 31.3200 -97.3300 251.000 457.0 100.364 4.250 -999.990 -999.990 1.004 ..P WKT 2010 07 21 02 54 55 31.3200 -97.3300 251.000 30.0 105.021 3.860 -999.990 -999.990 1.050 ..P WKT 2010 07 21 02 59 55 31.3200 -97.3300 251.000 122.0 104.883 4.610 -999.990 -999.990 1.049 ..P WKT 2010 07 21 03 04 55 31.3200 -97.3300 251.000 457.0 107.848 4.010 -999.990 -999.990 1.078 ..P WKT 2010 07 21 03 14 55 31.3200 -97.3300 251.000 30.0 117.719 4.310 -999.990 -999.990 1.177 ..P WKT 2010 07 21 03 19 55 31.3200 -97.3300 251.000 122.0 116.453 4.050 -999.990 -999.990 1.165 ..P WKT 2010 07 21 03 24 55 31.3200 -97.3300 251.000 457.0 85.738 3.990 -999.990 -999.990 0.857 ..P WKT 2010 07 21 03 29 55 31.3200 -97.3300 251.000 30.0 112.090 3.910 -999.990 -999.990 1.121 ..P WKT 2010 07 21 03 34 55 31.3200 -97.3300 251.000 122.0 113.784 3.650 -999.990 -999.990 1.138 ..P WKT 2010 07 21 03 39 55 31.3200 -97.3300 251.000 457.0 81.247 3.690 -999.990 -999.990 0.812 ..P WKT 2010 07 21 03 49 55 31.3200 -97.3300 251.000 30.0 114.758 4.040 -999.990 -999.990 1.148 ..P WKT 2010 07 21 03 54 55 31.3200 -97.3300 251.000 122.0 106.855 4.260 -999.990 -999.990 1.069 ..P WKT 2010 07 21 03 59 55 31.3200 -97.3300 251.000 457.0 77.550 4.110 -999.990 -999.990 0.775 ..P WKT 2010 07 21 04 04 55 31.3200 -97.3300 251.000 30.0 112.453 4.530 -999.990 -999.990 1.125 ..P WKT 2010 07 21 04 09 55 31.3200 -97.3300 251.000 122.0 108.072 4.330 -999.990 -999.990 1.081 ..P WKT 2010 07 21 04 14 55 31.3200 -97.3300 251.000 457.0 76.382 4.050 -999.990 -999.990 0.764 ..P WKT 2010 07 21 04 24 55 31.3200 -97.3300 251.000 30.0 114.234 3.870 -999.990 -999.990 1.142 ..P WKT 2010 07 21 04 29 55 31.3200 -97.3300 251.000 122.0 102.697 4.490 -999.990 -999.990 1.027 ..P WKT 2010 07 21 04 34 55 31.3200 -97.3300 251.000 457.0 82.720 3.900 -999.990 -999.990 0.827 ..P WKT 2010 07 21 04 39 55 31.3200 -97.3300 251.000 30.0 108.755 4.630 -999.990 -999.990 1.088 ..P WKT 2010 07 21 04 44 55 31.3200 -97.3300 251.000 122.0 96.519 4.010 -999.990 -999.990 0.965 ..P WKT 2010 07 21 04 49 55 31.3200 -97.3300 251.000 457.0 84.144 4.930 -999.990 -999.990 0.841 ..P WKT 2010 07 21 05 04 55 31.3200 -97.3300 251.000 30.0 98.254 4.780 -999.990 -999.990 0.983 ..P WKT 2010 07 21 05 09 55 31.3200 -97.3300 251.000 122.0 102.281 6.340 -999.990 -999.990 1.023 ..P WKT 2010 07 21 05 14 55 31.3200 -97.3300 251.000 457.0 86.483 4.390 -999.990 -999.990 0.865 ..P WKT 2010 07 21 05 19 55 31.3200 -97.3300 251.000 30.0 102.038 4.400 -999.990 -999.990 1.020 ..P WKT 2010 07 21 05 24 55 31.3200 -97.3300 251.000 122.0 99.035 3.910 -999.990 -999.990 0.990 ..P WKT 2010 07 21 05 29 55 31.3200 -97.3300 251.000 457.0 90.691 3.680 -999.990 -999.990 0.907 ..P WKT 2010 07 21 05 39 55 31.3200 -97.3300 251.000 30.0 103.634 3.920 -999.990 -999.990 1.036 ..P WKT 2010 07 21 05 44 55 31.3200 -97.3300 251.000 122.0 100.607 4.840 -999.990 -999.990 1.006 ..P WKT 2010 07 21 05 49 55 31.3200 -97.3300 251.000 457.0 79.034 4.380 -999.990 -999.990 0.790 ..P WKT 2010 07 21 05 54 55 31.3200 -97.3300 251.000 30.0 96.521 4.280 -999.990 -999.990 0.965 ..P WKT 2010 07 21 05 59 55 31.3200 -97.3300 251.000 122.0 98.552 3.860 -999.990 -999.990 0.986 ..P WKT 2010 07 21 06 04 55 31.3200 -97.3300 251.000 457.0 75.581 4.680 -999.990 -999.990 0.756 ..P WKT 2010 07 21 06 14 55 31.3200 -97.3300 251.000 30.0 97.301 4.670 -999.990 -999.990 0.973 ..P WKT 2010 07 21 06 19 55 31.3200 -97.3300 251.000 122.0 97.326 5.390 -999.990 -999.990 0.973 ..P WKT 2010 07 21 06 24 55 31.3200 -97.3300 251.000 457.0 72.077 4.400 -999.990 -999.990 0.721 ..P WKT 2010 07 21 06 29 55 31.3200 -97.3300 251.000 30.0 94.005 4.550 -999.990 -999.990 0.940 ..P WKT 2010 07 21 06 34 55 31.3200 -97.3300 251.000 122.0 93.188 5.000 -999.990 -999.990 0.932 ..P WKT 2010 07 21 06 39 55 31.3200 -97.3300 251.000 457.0 72.158 4.830 -999.990 -999.990 0.722 ..P WKT 2010 07 21 06 49 55 31.3200 -97.3300 251.000 30.0 96.610 5.620 -999.990 -999.990 0.966 ..P WKT 2010 07 21 06 54 55 31.3200 -97.3300 251.000 122.0 228.799 6.620 -999.990 -999.990 2.288 ..P WKT 2010 07 21 06 59 55 31.3200 -97.3300 251.000 457.0 75.011 4.660 -999.990 -999.990 0.750 ..P WKT 2010 07 21 07 04 55 31.3200 -97.3300 251.000 30.0 89.609 4.680 -999.990 -999.990 0.896 ..P WKT 2010 07 21 07 09 55 31.3200 -97.3300 251.000 122.0 124.124 5.180 -999.990 -999.990 1.241 ..P WKT 2010 07 21 07 14 55 31.3200 -97.3300 251.000 457.0 76.154 4.650 -999.990 -999.990 0.762 ..P WKT 2010 07 21 07 24 55 31.3200 -97.3300 251.000 30.0 99.567 5.300 -999.990 -999.990 0.996 ..P WKT 2010 07 21 07 29 55 31.3200 -97.3300 251.000 122.0 103.758 7.260 -999.990 -999.990 1.038 ..P WKT 2010 07 21 07 34 55 31.3200 -97.3300 251.000 457.0 83.130 5.740 -999.990 -999.990 0.831 ..P WKT 2010 07 21 07 39 55 31.3200 -97.3300 251.000 30.0 95.033 4.380 -999.990 -999.990 0.950 ..P WKT 2010 07 21 07 44 55 31.3200 -97.3300 251.000 122.0 95.438 4.940 -999.990 -999.990 0.954 ..P WKT 2010 07 21 07 49 55 31.3200 -97.3300 251.000 457.0 81.265 4.080 -999.990 -999.990 0.813 ..P WKT 2010 07 21 07 59 55 31.3200 -97.3300 251.000 30.0 93.509 4.230 -999.990 -999.990 0.935 ..P WKT 2010 07 21 08 04 55 31.3200 -97.3300 251.000 122.0 95.957 4.440 -999.990 -999.990 0.960 ..P WKT 2010 07 21 08 09 55 31.3200 -97.3300 251.000 457.0 86.633 4.970 -999.990 -999.990 0.866 ..P WKT 2010 07 21 08 14 55 31.3200 -97.3300 251.000 30.0 99.868 5.730 -999.990 -999.990 0.999 ..P WKT 2010 07 21 08 19 55 31.3200 -97.3300 251.000 122.0 101.753 6.320 -999.990 -999.990 1.018 ..P WKT 2010 07 21 08 24 55 31.3200 -97.3300 251.000 457.0 88.651 5.940 -999.990 -999.990 0.887 ..P WKT 2010 07 21 08 34 55 31.3200 -97.3300 251.000 30.0 101.665 5.920 -999.990 -999.990 1.017 ..P WKT 2010 07 21 08 39 55 31.3200 -97.3300 251.000 122.0 109.431 5.970 -999.990 -999.990 1.094 ..P WKT 2010 07 21 08 44 55 31.3200 -97.3300 251.000 457.0 84.010 5.050 -999.990 -999.990 0.840 ..P WKT 2010 07 21 08 49 55 31.3200 -97.3300 251.000 30.0 97.237 6.140 -999.990 -999.990 0.972 ..P WKT 2010 07 21 08 54 55 31.3200 -97.3300 251.000 122.0 95.482 4.410 -999.990 -999.990 0.955 ..P WKT 2010 07 21 08 59 55 31.3200 -97.3300 251.000 457.0 73.150 4.210 -999.990 -999.990 0.732 ..P WKT 2010 07 21 09 09 55 31.3200 -97.3300 251.000 30.0 98.454 4.180 -999.990 -999.990 0.985 ..P WKT 2010 07 21 09 14 55 31.3200 -97.3300 251.000 122.0 91.502 4.330 -999.990 -999.990 0.915 ..P WKT 2010 07 21 09 19 55 31.3200 -97.3300 251.000 457.0 72.657 4.490 -999.990 -999.990 0.727 ..P WKT 2010 07 21 09 24 55 31.3200 -97.3300 251.000 30.0 97.328 5.060 -999.990 -999.990 0.973 ..P WKT 2010 07 21 09 29 55 31.3200 -97.3300 251.000 122.0 92.336 5.070 -999.990 -999.990 0.923 ..P WKT 2010 07 21 09 34 55 31.3200 -97.3300 251.000 457.0 72.238 4.840 -999.990 -999.990 0.722 ..P WKT 2010 07 21 09 44 55 31.3200 -97.3300 251.000 30.0 103.678 6.010 -999.990 -999.990 1.037 ..P WKT 2010 07 21 09 49 55 31.3200 -97.3300 251.000 122.0 89.199 5.310 -999.990 -999.990 0.892 ..P WKT 2010 07 21 09 54 55 31.3200 -97.3300 251.000 457.0 77.518 4.580 -999.990 -999.990 0.775 ..P WKT 2010 07 21 09 59 55 31.3200 -97.3300 251.000 30.0 104.988 4.520 -999.990 -999.990 1.050 ..P WKT 2010 07 21 10 04 55 31.3200 -97.3300 251.000 122.0 82.963 4.410 -999.990 -999.990 0.830 ..P WKT 2010 07 21 10 09 55 31.3200 -97.3300 251.000 457.0 77.996 4.660 -999.990 -999.990 0.780 ..P WKT 2010 07 21 10 19 55 31.3200 -97.3300 251.000 30.0 108.516 4.520 -999.990 -999.990 1.085 ..P WKT 2010 07 21 10 24 55 31.3200 -97.3300 251.000 122.0 88.656 4.730 -999.990 -999.990 0.887 ..P WKT 2010 07 21 10 29 55 31.3200 -97.3300 251.000 457.0 80.536 5.160 -999.990 -999.990 0.805 ..P WKT 2010 07 21 10 34 55 31.3200 -97.3300 251.000 30.0 105.951 5.630 -999.990 -999.990 1.060 ..P WKT 2010 07 21 10 39 55 31.3200 -97.3300 251.000 122.0 93.362 6.060 -999.990 -999.990 0.934 ..P WKT 2010 07 21 10 44 55 31.3200 -97.3300 251.000 457.0 83.847 6.810 -999.990 -999.990 0.838 ..P WKT 2010 07 21 10 54 55 31.3200 -97.3300 251.000 30.0 111.612 7.240 -999.990 -999.990 1.116 ..P WKT 2010 07 21 10 59 55 31.3200 -97.3300 251.000 122.0 81.012 6.730 -999.990 -999.990 0.810 ..P WKT 2010 07 21 11 04 55 31.3200 -97.3300 251.000 457.0 74.993 5.970 -999.990 -999.990 0.750 ..P WKT 2010 07 21 11 09 55 31.3200 -97.3300 251.000 30.0 99.972 5.750 -999.990 -999.990 1.000 ..P WKT 2010 07 21 11 14 55 31.3200 -97.3300 251.000 122.0 87.252 5.140 -999.990 -999.990 0.873 ..P WKT 2010 07 21 11 19 55 31.3200 -97.3300 251.000 457.0 75.652 4.650 -999.990 -999.990 0.757 ..P WKT 2010 07 21 11 29 55 31.3200 -97.3300 251.000 30.0 103.433 6.180 -999.990 -999.990 1.034 ..P WKT 2010 07 21 11 34 55 31.3200 -97.3300 251.000 122.0 89.217 5.080 -999.990 -999.990 0.892 ..P WKT 2010 07 21 11 39 55 31.3200 -97.3300 251.000 457.0 82.539 5.970 -999.990 -999.990 0.825 ..P WKT 2010 07 21 11 44 55 31.3200 -97.3300 251.000 30.0 97.490 6.040 -999.990 -999.990 0.975 ..P WKT 2010 07 21 11 49 55 31.3200 -97.3300 251.000 122.0 86.209 5.390 -999.990 -999.990 0.862 ..P WKT 2010 07 21 12 09 55 31.3200 -97.3300 251.000 457.0 72.025 4.930 -999.990 -999.990 0.720 ..P WKT 2010 07 21 12 10 25 31.3200 -97.3300 251.000 457.0 75.172 4.330 -999.990 -999.990 0.752 ..P WKT 2010 07 21 12 10 55 31.3200 -97.3300 251.000 457.0 74.551 4.630 -999.990 -999.990 0.746 ..P WKT 2010 07 21 12 11 25 31.3200 -97.3300 251.000 457.0 71.419 4.260 -999.990 -999.990 0.714 ..P WKT 2010 07 21 12 11 55 31.3200 -97.3300 251.000 457.0 70.800 4.430 -999.990 -999.990 0.708 ..P WKT 2010 07 21 12 12 25 31.3200 -97.3300 251.000 457.0 72.132 4.530 -999.990 -999.990 0.721 ..P WKT 2010 07 21 12 12 55 31.3200 -97.3300 251.000 457.0 70.954 4.490 -999.990 -999.990 0.710 ..P WKT 2010 07 21 12 13 25 31.3200 -97.3300 251.000 457.0 73.962 5.040 -999.990 -999.990 0.740 ..P WKT 2010 07 21 12 13 55 31.3200 -97.3300 251.000 457.0 77.108 4.660 -999.990 -999.990 0.771 ..P WKT 2010 07 21 12 14 25 31.3200 -97.3300 251.000 457.0 78.302 4.990 -999.990 -999.990 0.783 ..P WKT 2010 07 21 12 14 55 31.3200 -97.3300 251.000 457.0 78.240 4.760 -999.990 -999.990 0.782 ..P WKT 2010 07 21 12 19 55 31.3200 -97.3300 251.000 30.0 100.504 4.960 -999.990 -999.990 1.005 ..P WKT 2010 07 21 12 24 55 31.3200 -97.3300 251.000 122.0 95.560 7.000 -999.990 -999.990 0.956 ..P WKT 2010 07 21 12 29 55 31.3200 -97.3300 251.000 457.0 75.956 5.540 -999.990 -999.990 0.760 ..P WKT 2010 07 21 12 34 55 31.3200 -97.3300 251.000 30.0 104.511 5.150 -999.990 -999.990 1.045 ..P WKT 2010 07 21 12 39 55 31.3200 -97.3300 251.000 122.0 89.931 4.590 -999.990 -999.990 0.899 ..P WKT 2010 07 21 12 44 55 31.3200 -97.3300 251.000 457.0 70.458 6.050 -999.990 -999.990 0.705 ..P WKT 2010 07 21 12 54 55 31.3200 -97.3300 251.000 30.0 99.480 4.650 -999.990 -999.990 0.995 ..P WKT 2010 07 21 12 59 55 31.3200 -97.3300 251.000 122.0 86.107 4.640 -999.990 -999.990 0.861 ..P WKT 2010 07 21 13 04 55 31.3200 -97.3300 251.000 457.0 67.001 5.100 -999.990 -999.990 0.670 ..P WKT 2010 07 21 13 09 55 31.3200 -97.3300 251.000 30.0 113.146 4.960 -999.990 -999.990 1.131 ..P WKT 2010 07 21 13 14 55 31.3200 -97.3300 251.000 122.0 94.737 6.020 -999.990 -999.990 0.947 ..P WKT 2010 07 21 13 19 55 31.3200 -97.3300 251.000 457.0 75.066 4.570 -999.990 -999.990 0.751 ..P WKT 2010 07 21 13 29 55 31.3200 -97.3300 251.000 30.0 107.649 4.760 -999.990 -999.990 1.076 ..P WKT 2010 07 21 13 34 55 31.3200 -97.3300 251.000 122.0 100.356 5.230 -999.990 -999.990 1.004 ..P WKT 2010 07 21 13 39 55 31.3200 -97.3300 251.000 457.0 76.560 5.080 -999.990 -999.990 0.766 ..P WKT 2010 07 21 13 44 55 31.3200 -97.3300 251.000 30.0 94.436 4.720 -999.990 -999.990 0.944 ..P WKT 2010 07 21 13 49 55 31.3200 -97.3300 251.000 122.0 103.645 4.760 -999.990 -999.990 1.036 ..P WKT 2010 07 21 13 54 55 31.3200 -97.3300 251.000 457.0 71.446 4.570 -999.990 -999.990 0.714 ..P WKT 2010 07 21 14 04 55 31.3200 -97.3300 251.000 30.0 96.541 4.610 -999.990 -999.990 0.965 ..P WKT 2010 07 21 14 09 55 31.3200 -97.3300 251.000 122.0 102.356 4.510 -999.990 -999.990 1.024 ..P WKT 2010 07 21 14 14 55 31.3200 -97.3300 251.000 457.0 78.778 5.340 -999.990 -999.990 0.788 ..P WKT 2010 07 21 14 19 55 31.3200 -97.3300 251.000 30.0 99.710 5.930 -999.990 -999.990 0.997 ..P WKT 2010 07 21 14 24 55 31.3200 -97.3300 251.000 122.0 104.128 5.820 -999.990 -999.990 1.041 ..P WKT 2010 07 21 14 29 55 31.3200 -97.3300 251.000 457.0 140.472 5.660 -999.990 -999.990 1.405 ..P WKT 2010 07 21 14 39 55 31.3200 -97.3300 251.000 30.0 114.866 4.510 -999.990 -999.990 1.149 ..P WKT 2010 07 21 14 44 55 31.3200 -97.3300 251.000 122.0 120.128 6.050 -999.990 -999.990 1.201 ..P WKT 2010 07 21 14 49 55 31.3200 -97.3300 251.000 457.0 80.839 7.530 -999.990 -999.990 0.808 ..P WKT 2010 07 21 14 54 55 31.3200 -97.3300 251.000 30.0 116.925 5.400 -999.990 -999.990 1.169 ..P WKT 2010 07 21 14 59 55 31.3200 -97.3300 251.000 122.0 105.372 5.380 -999.990 -999.990 1.054 ..P WKT 2010 07 21 15 04 55 31.3200 -97.3300 251.000 457.0 91.015 4.890 -999.990 -999.990 0.910 ..P WKT 2010 07 21 15 14 55 31.3200 -97.3300 251.000 30.0 84.959 4.850 -999.990 -999.990 0.850 ..P WKT 2010 07 21 15 19 55 31.3200 -97.3300 251.000 122.0 100.557 5.300 -999.990 -999.990 1.006 ..P WKT 2010 07 21 15 24 55 31.3200 -97.3300 251.000 457.0 78.579 5.740 -999.990 -999.990 0.786 ..P WKT 2010 07 21 15 29 55 31.3200 -97.3300 251.000 30.0 85.064 5.060 -999.990 -999.990 0.851 ..P WKT 2010 07 21 15 34 55 31.3200 -97.3300 251.000 122.0 93.515 4.710 -999.990 -999.990 0.935 ..P WKT 2010 07 21 15 39 55 31.3200 -97.3300 251.000 457.0 82.609 4.860 -999.990 -999.990 0.826 ..P WKT 2010 07 21 15 49 55 31.3200 -97.3300 251.000 30.0 87.069 4.480 -999.990 -999.990 0.871 ..P WKT 2010 07 21 15 54 55 31.3200 -97.3300 251.000 122.0 88.548 4.200 -999.990 -999.990 0.885 ..P WKT 2010 07 21 15 59 55 31.3200 -97.3300 251.000 457.0 87.080 4.500 -999.990 -999.990 0.871 ..P WKT 2010 07 21 16 04 55 31.3200 -97.3300 251.000 30.0 81.541 5.380 -999.990 -999.990 0.815 ..P WKT 2010 07 21 16 09 55 31.3200 -97.3300 251.000 122.0 88.775 4.700 -999.990 -999.990 0.888 ..P WKT 2010 07 21 16 14 55 31.3200 -97.3300 251.000 457.0 81.550 4.380 -999.990 -999.990 0.816 ..P WKT 2010 07 21 16 24 55 31.3200 -97.3300 251.000 30.0 82.302 4.620 -999.990 -999.990 0.823 ..P WKT 2010 07 21 16 29 55 31.3200 -97.3300 251.000 122.0 93.935 5.270 -999.990 -999.990 0.939 ..P WKT 2010 07 21 16 34 55 31.3200 -97.3300 251.000 457.0 86.888 7.060 -999.990 -999.990 0.869 ..P WKT 2010 07 21 16 39 55 31.3200 -97.3300 251.000 30.0 87.706 8.000 -999.990 -999.990 0.877 ..P WKT 2010 07 21 16 44 55 31.3200 -97.3300 251.000 122.0 85.995 7.080 -999.990 -999.990 0.860 ..P WKT 2010 07 21 16 49 55 31.3200 -97.3300 251.000 457.0 77.678 5.540 -999.990 -999.990 0.777 ..P WKT 2010 07 21 17 04 55 31.3200 -97.3300 251.000 30.0 85.238 6.650 -999.990 -999.990 0.852 ..P WKT 2010 07 21 17 09 55 31.3200 -97.3300 251.000 122.0 87.204 8.000 -999.990 -999.990 0.872 ..P WKT 2010 07 21 17 14 55 31.3200 -97.3300 251.000 457.0 87.483 8.180 -999.990 -999.990 0.875 ..P WKT 2010 07 21 17 19 55 31.3200 -97.3300 251.000 30.0 87.481 6.990 -999.990 -999.990 0.875 ..P WKT 2010 07 21 17 24 55 31.3200 -97.3300 251.000 122.0 89.167 6.120 -999.990 -999.990 0.892 ..P WKT 2010 07 21 17 29 55 31.3200 -97.3300 251.000 457.0 79.599 5.220 -999.990 -999.990 0.796 ..P WKT 2010 07 21 17 39 55 31.3200 -97.3300 251.000 30.0 81.460 5.020 -999.990 -999.990 0.815 ..P WKT 2010 07 21 17 44 55 31.3200 -97.3300 251.000 122.0 92.895 6.630 -999.990 -999.990 0.929 ..P WKT 2010 07 21 17 49 55 31.3200 -97.3300 251.000 457.0 85.752 7.770 -999.990 -999.990 0.858 ..P WKT 2010 07 21 17 54 55 31.3200 -97.3300 251.000 30.0 84.521 5.760 -999.990 -999.990 0.845 ..P WKT 2010 07 21 17 59 55 31.3200 -97.3300 251.000 122.0 93.145 4.720 -999.990 -999.990 0.931 ..P WKT 2010 07 21 18 04 55 31.3200 -97.3300 251.000 457.0 82.338 4.160 -999.990 -999.990 0.823 ..P WKT 2010 07 21 18 14 55 31.3200 -97.3300 251.000 30.0 94.843 4.180 -999.990 -999.990 0.948 ..P WKT 2010 07 21 18 19 55 31.3200 -97.3300 251.000 122.0 96.752 5.470 -999.990 -999.990 0.968 ..P WKT 2010 07 21 18 24 55 31.3200 -97.3300 251.000 457.0 91.616 3.980 -999.990 -999.990 0.916 ..P WKT 2010 07 21 18 29 55 31.3200 -97.3300 251.000 30.0 94.370 3.970 -999.990 -999.990 0.944 ..P WKT 2010 07 21 18 34 55 31.3200 -97.3300 251.000 122.0 93.742 5.920 -999.990 -999.990 0.937 ..P WKT 2010 07 21 18 39 55 31.3200 -97.3300 251.000 457.0 82.121 5.480 -999.990 -999.990 0.821 ..P WKT 2010 07 21 18 49 55 31.3200 -97.3300 251.000 30.0 89.622 4.410 -999.990 -999.990 0.896 ..P WKT 2010 07 21 18 54 55 31.3200 -97.3300 251.000 122.0 98.884 4.000 -999.990 -999.990 0.989 ..P WKT 2010 07 21 18 59 55 31.3200 -97.3300 251.000 457.0 87.841 4.650 -999.990 -999.990 0.878 ..P WKT 2010 07 21 19 04 55 31.3200 -97.3300 251.000 30.0 85.539 5.830 -999.990 -999.990 0.855 ..P WKT 2010 07 21 19 09 55 31.3200 -97.3300 251.000 122.0 96.497 5.600 -999.990 -999.990 0.965 ..P WKT 2010 07 21 19 14 55 31.3200 -97.3300 251.000 457.0 90.387 4.460 -999.990 -999.990 0.904 ..P WKT 2010 07 21 19 24 55 31.3200 -97.3300 251.000 30.0 91.164 4.610 -999.990 -999.990 0.912 ..P WKT 2010 07 21 19 29 55 31.3200 -97.3300 251.000 122.0 92.128 4.820 -999.990 -999.990 0.921 ..P WKT 2010 07 21 19 34 55 31.3200 -97.3300 251.000 457.0 88.152 5.630 -999.990 -999.990 0.882 ..P WKT 2010 07 21 19 39 55 31.3200 -97.3300 251.000 30.0 84.316 5.360 -999.990 -999.990 0.843 ..P WKT 2010 07 21 19 44 55 31.3200 -97.3300 251.000 122.0 95.303 4.580 -999.990 -999.990 0.953 ..P WKT 2010 07 21 19 49 55 31.3200 -97.3300 251.000 457.0 85.537 3.860 -999.990 -999.990 0.855 ..P WKT 2010 07 21 19 59 55 31.3200 -97.3300 251.000 30.0 85.850 4.660 -999.990 -999.990 0.858 ..P WKT 2010 07 21 20 04 55 31.3200 -97.3300 251.000 122.0 94.804 3.820 -999.990 -999.990 0.948 ..P WKT 2010 07 21 20 09 55 31.3200 -97.3300 251.000 457.0 93.590 5.060 -999.990 -999.990 0.936 ..P WKT 2010 07 21 20 14 55 31.3200 -97.3300 251.000 30.0 95.060 4.440 -999.990 -999.990 0.951 ..P WKT 2010 07 21 20 19 55 31.3200 -97.3300 251.000 122.0 95.823 4.020 -999.990 -999.990 0.958 ..P WKT 2010 07 21 20 24 55 31.3200 -97.3300 251.000 457.0 89.238 4.190 -999.990 -999.990 0.892 ..P WKT 2010 07 21 20 34 55 31.3200 -97.3300 251.000 30.0 90.400 3.890 -999.990 -999.990 0.904 ..P WKT 2010 07 21 20 39 55 31.3200 -97.3300 251.000 122.0 96.739 4.270 -999.990 -999.990 0.967 ..P WKT 2010 07 21 20 44 55 31.3200 -97.3300 251.000 457.0 89.362 4.210 -999.990 -999.990 0.894 ..P WKT 2010 07 21 20 49 55 31.3200 -97.3300 251.000 30.0 101.925 6.270 -999.990 -999.990 1.019 ..P WKT 2010 07 21 20 54 55 31.3200 -97.3300 251.000 122.0 102.610 4.280 -999.990 -999.990 1.026 ..P WKT 2010 07 21 20 59 55 31.3200 -97.3300 251.000 457.0 98.484 4.210 -999.990 -999.990 0.985 ..P WKT 2010 07 21 21 09 55 31.3200 -97.3300 251.000 30.0 97.973 5.010 -999.990 -999.990 0.980 ..P WKT 2010 07 21 21 14 55 31.3200 -97.3300 251.000 122.0 100.032 3.860 -999.990 -999.990 1.000 ..P WKT 2010 07 21 21 19 55 31.3200 -97.3300 251.000 457.0 90.202 3.920 -999.990 -999.990 0.902 ..P WKT 2010 07 21 21 24 55 31.3200 -97.3300 251.000 30.0 88.013 4.400 -999.990 -999.990 0.880 ..P WKT 2010 07 21 21 29 55 31.3200 -97.3300 251.000 122.0 94.602 3.750 -999.990 -999.990 0.946 ..P WKT 2010 07 21 21 34 55 31.3200 -97.3300 251.000 457.0 82.786 4.040 -999.990 -999.990 0.828 ..P WKT 2010 07 21 21 44 55 31.3200 -97.3300 251.000 30.0 90.079 3.730 -999.990 -999.990 0.901 ..P WKT 2010 07 21 21 49 55 31.3200 -97.3300 251.000 122.0 88.234 5.050 -999.990 -999.990 0.882 ..P WKT 2010 07 21 21 54 55 31.3200 -97.3300 251.000 457.0 88.937 4.480 -999.990 -999.990 0.889 ..P WKT 2010 07 21 21 59 55 31.3200 -97.3300 251.000 30.0 84.258 4.530 -999.990 -999.990 0.843 ..P WKT 2010 07 21 22 04 55 31.3200 -97.3300 251.000 122.0 92.613 4.370 -999.990 -999.990 0.926 ..P WKT 2010 07 21 22 09 55 31.3200 -97.3300 251.000 457.0 86.515 3.910 -999.990 -999.990 0.865 ..P WKT 2010 07 21 22 19 55 31.3200 -97.3300 251.000 30.0 90.597 3.810 -999.990 -999.990 0.906 ..P WKT 2010 07 21 22 24 55 31.3200 -97.3300 251.000 122.0 90.856 4.890 -999.990 -999.990 0.909 ..P WKT 2010 07 21 22 29 55 31.3200 -97.3300 251.000 457.0 83.458 4.870 -999.990 -999.990 0.835 ..P WKT 2010 07 21 22 34 55 31.3200 -97.3300 251.000 30.0 80.880 5.300 -999.990 -999.990 0.809 ..P WKT 2010 07 21 22 39 55 31.3200 -97.3300 251.000 122.0 81.989 5.950 -999.990 -999.990 0.820 ..P WKT 2010 07 21 22 44 55 31.3200 -97.3300 251.000 457.0 78.559 4.380 -999.990 -999.990 0.786 ..P WKT 2010 07 21 22 54 55 31.3200 -97.3300 251.000 30.0 76.540 5.090 -999.990 -999.990 0.765 ..P WKT 2010 07 21 22 59 55 31.3200 -97.3300 251.000 122.0 82.779 4.870 -999.990 -999.990 0.828 ..P WKT 2010 07 21 23 04 55 31.3200 -97.3300 251.000 457.0 83.057 5.490 -999.990 -999.990 0.831 ..P WKT 2010 07 21 23 09 55 31.3200 -97.3300 251.000 30.0 80.071 5.710 -999.990 -999.990 0.801 ..P WKT 2010 07 21 23 14 55 31.3200 -97.3300 251.000 122.0 87.306 5.500 -999.990 -999.990 0.873 ..P WKT 2010 07 21 23 19 55 31.3200 -97.3300 251.000 457.0 76.652 5.460 -999.990 -999.990 0.767 ..P WKT 2010 07 21 23 29 55 31.3200 -97.3300 251.000 30.0 82.306 5.350 -999.990 -999.990 0.823 ..P WKT 2010 07 21 23 34 55 31.3200 -97.3300 251.000 122.0 91.945 5.440 -999.990 -999.990 0.919 ..P WKT 2010 07 21 23 39 55 31.3200 -97.3300 251.000 457.0 81.128 5.040 -999.990 -999.990 0.811 ..P WKT 2010 07 21 23 44 55 31.3200 -97.3300 251.000 30.0 83.807 5.140 -999.990 -999.990 0.838 ..P WKT 2010 07 21 23 49 55 31.3200 -97.3300 251.000 122.0 92.597 4.650 -999.990 -999.990 0.926 ..P WKT 2010 07 22 00 09 55 31.3200 -97.3300 251.000 457.0 88.932 4.800 -999.990 -999.990 0.889 ..P WKT 2010 07 22 00 10 25 31.3200 -97.3300 251.000 457.0 88.674 5.220 -999.990 -999.990 0.887 ..P WKT 2010 07 22 00 10 55 31.3200 -97.3300 251.000 457.0 86.569 4.130 -999.990 -999.990 0.866 ..P WKT 2010 07 22 00 11 25 31.3200 -97.3300 251.000 457.0 86.169 4.450 -999.990 -999.990 0.862 ..P WKT 2010 07 22 00 11 55 31.3200 -97.3300 251.000 457.0 80.370 4.600 -999.990 -999.990 0.804 ..P WKT 2010 07 22 00 12 25 31.3200 -97.3300 251.000 457.0 84.090 4.100 -999.990 -999.990 0.841 ..P WKT 2010 07 22 00 12 55 31.3200 -97.3300 251.000 457.0 89.515 5.260 -999.990 -999.990 0.895 ..P WKT 2010 07 22 00 13 25 31.3200 -97.3300 251.000 457.0 89.257 3.980 -999.990 -999.990 0.893 ..P WKT 2010 07 22 00 13 55 31.3200 -97.3300 251.000 457.0 87.578 4.180 -999.990 -999.990 0.876 ..P WKT 2010 07 22 00 14 25 31.3200 -97.3300 251.000 457.0 90.303 4.640 -999.990 -999.990 0.903 ..P WKT 2010 07 22 00 14 55 31.3200 -97.3300 251.000 457.0 89.050 4.080 -999.990 -999.990 0.890 ..P WKT 2010 07 22 00 19 55 31.3200 -97.3300 251.000 30.0 84.483 4.930 -999.990 -999.990 0.845 ..P WKT 2010 07 22 00 24 55 31.3200 -97.3300 251.000 122.0 89.571 4.050 -999.990 -999.990 0.896 ..P WKT 2010 07 22 00 29 55 31.3200 -97.3300 251.000 457.0 87.987 4.190 -999.990 -999.990 0.880 ..P WKT 2010 07 22 00 34 55 31.3200 -97.3300 251.000 30.0 88.673 4.620 -999.990 -999.990 0.887 ..P WKT 2010 07 22 00 39 55 31.3200 -97.3300 251.000 122.0 100.285 3.960 -999.990 -999.990 1.003 ..P WKT 2010 07 22 00 44 55 31.3200 -97.3300 251.000 457.0 90.186 4.450 -999.990 -999.990 0.902 ..P WKT 2010 07 22 00 54 55 31.3200 -97.3300 251.000 30.0 98.684 4.760 -999.990 -999.990 0.987 ..P WKT 2010 07 22 00 59 55 31.3200 -97.3300 251.000 122.0 104.933 5.170 -999.990 -999.990 1.049 ..P WKT 2010 07 22 01 04 55 31.3200 -97.3300 251.000 457.0 100.690 3.600 -999.990 -999.990 1.007 ..P WKT 2010 07 22 01 09 55 31.3200 -97.3300 251.000 30.0 108.495 3.610 -999.990 -999.990 1.085 ..P WKT 2010 07 22 01 14 55 31.3200 -97.3300 251.000 122.0 109.495 5.670 -999.990 -999.990 1.095 ..P WKT 2010 07 22 01 19 55 31.3200 -97.3300 251.000 457.0 101.145 3.680 -999.990 -999.990 1.011 ..P WKT 2010 07 22 01 29 55 31.3200 -97.3300 251.000 30.0 113.021 5.830 -999.990 -999.990 1.130 ..P WKT 2010 07 22 01 34 55 31.3200 -97.3300 251.000 122.0 121.341 3.660 -999.990 -999.990 1.213 ..P WKT 2010 07 22 01 39 55 31.3200 -97.3300 251.000 457.0 116.068 4.120 -999.990 -999.990 1.161 ..P WKT 2010 07 22 01 44 55 31.3200 -97.3300 251.000 30.0 117.026 4.730 -999.990 -999.990 1.170 ..P WKT 2010 07 22 01 49 55 31.3200 -97.3300 251.000 122.0 125.906 4.720 -999.990 -999.990 1.259 ..P WKT 2010 07 22 01 54 55 31.3200 -97.3300 251.000 457.0 121.485 3.830 -999.990 -999.990 1.215 ..P WKT 2010 07 22 02 04 55 31.3200 -97.3300 251.000 30.0 122.102 3.590 -999.990 -999.990 1.221 ..P WKT 2010 07 22 02 09 55 31.3200 -97.3300 251.000 122.0 118.089 6.370 -999.990 -999.990 1.181 ..P WKT 2010 07 22 02 14 55 31.3200 -97.3300 251.000 457.0 121.145 5.930 -999.990 -999.990 1.211 ..P WKT 2010 07 22 02 19 55 31.3200 -97.3300 251.000 30.0 116.850 5.040 -999.990 -999.990 1.168 ..P WKT 2010 07 22 02 24 55 31.3200 -97.3300 251.000 122.0 122.448 4.980 -999.990 -999.990 1.224 ..P WKT 2010 07 22 02 29 55 31.3200 -97.3300 251.000 457.0 110.245 4.950 -999.990 -999.990 1.102 ..P WKT 2010 07 22 02 39 55 31.3200 -97.3300 251.000 30.0 112.419 4.030 -999.990 -999.990 1.124 ..P WKT 2010 07 22 02 44 55 31.3200 -97.3300 251.000 122.0 116.057 4.390 -999.990 -999.990 1.161 ..P WKT 2010 07 22 02 49 55 31.3200 -97.3300 251.000 457.0 89.771 6.090 -999.990 -999.990 0.898 ..P WKT 2010 07 22 02 54 55 31.3200 -97.3300 251.000 30.0 102.726 4.970 -999.990 -999.990 1.027 ..P WKT 2010 07 22 02 59 55 31.3200 -97.3300 251.000 122.0 107.492 4.020 -999.990 -999.990 1.075 ..P WKT 2010 07 22 03 04 55 31.3200 -97.3300 251.000 457.0 84.893 3.820 -999.990 -999.990 0.849 ..P WKT 2010 07 22 03 14 55 31.3200 -97.3300 251.000 30.0 106.612 3.670 -999.990 -999.990 1.066 ..P WKT 2010 07 22 03 19 55 31.3200 -97.3300 251.000 122.0 106.782 5.180 -999.990 -999.990 1.068 ..P WKT 2010 07 22 03 24 55 31.3200 -97.3300 251.000 457.0 101.455 4.780 -999.990 -999.990 1.015 ..P WKT 2010 07 22 03 29 55 31.3200 -97.3300 251.000 30.0 101.203 4.490 -999.990 -999.990 1.012 ..P WKT 2010 07 22 03 34 55 31.3200 -97.3300 251.000 122.0 103.487 3.400 -999.990 -999.990 1.035 ..P WKT 2010 07 22 03 39 55 31.3200 -97.3300 251.000 457.0 99.010 3.750 -999.990 -999.990 0.990 ..P WKT 2010 07 22 03 49 55 31.3200 -97.3300 251.000 30.0 98.206 4.170 -999.990 -999.990 0.982 ..P WKT 2010 07 22 03 54 55 31.3200 -97.3300 251.000 122.0 103.425 4.040 -999.990 -999.990 1.034 ..P WKT 2010 07 22 03 59 55 31.3200 -97.3300 251.000 457.0 104.420 3.600 -999.990 -999.990 1.044 ..P WKT 2010 07 22 04 04 55 31.3200 -97.3300 251.000 30.0 92.891 6.240 -999.990 -999.990 0.929 ..P WKT 2010 07 22 04 09 55 31.3200 -97.3300 251.000 122.0 96.279 5.480 -999.990 -999.990 0.963 ..P WKT 2010 07 22 04 14 55 31.3200 -97.3300 251.000 457.0 103.604 3.740 -999.990 -999.990 1.036 ..P WKT 2010 07 22 04 24 55 31.3200 -97.3300 251.000 30.0 92.878 4.060 -999.990 -999.990 0.929 ..P WKT 2010 07 22 04 29 55 31.3200 -97.3300 251.000 122.0 99.857 3.800 -999.990 -999.990 0.999 ..P WKT 2010 07 22 04 34 55 31.3200 -97.3300 251.000 457.0 87.722 4.020 -999.990 -999.990 0.877 ..P WKT 2010 07 22 04 39 55 31.3200 -97.3300 251.000 30.0 90.905 3.700 -999.990 -999.990 0.909 ..P WKT 2010 07 22 04 44 55 31.3200 -97.3300 251.000 122.0 93.527 4.010 -999.990 -999.990 0.935 ..P WKT 2010 07 22 04 49 55 31.3200 -97.3300 251.000 457.0 84.489 5.410 -999.990 -999.990 0.845 ..P WKT 2010 07 22 05 04 55 31.3200 -97.3300 251.000 30.0 85.728 3.990 -999.990 -999.990 0.857 ..P WKT 2010 07 22 05 09 55 31.3200 -97.3300 251.000 122.0 96.614 3.490 -999.990 -999.990 0.966 ..P WKT 2010 07 22 05 14 55 31.3200 -97.3300 251.000 457.0 88.696 4.560 -999.990 -999.990 0.887 ..P WKT 2010 07 22 05 19 55 31.3200 -97.3300 251.000 30.0 93.124 4.810 -999.990 -999.990 0.931 ..P WKT 2010 07 22 05 24 55 31.3200 -97.3300 251.000 122.0 102.038 4.250 -999.990 -999.990 1.020 ..P WKT 2010 07 22 05 29 55 31.3200 -97.3300 251.000 457.0 85.711 3.390 -999.990 -999.990 0.857 ..P WKT 2010 07 22 05 39 55 31.3200 -97.3300 251.000 30.0 99.940 3.830 -999.990 -999.990 0.999 ..P WKT 2010 07 22 05 44 55 31.3200 -97.3300 251.000 122.0 101.892 3.490 -999.990 -999.990 1.019 ..P WKT 2010 07 22 05 49 55 31.3200 -97.3300 251.000 457.0 80.027 4.360 -999.990 -999.990 0.800 ..P WKT 2010 07 22 05 54 55 31.3200 -97.3300 251.000 30.0 97.669 4.060 -999.990 -999.990 0.977 ..P WKT 2010 07 22 05 59 55 31.3200 -97.3300 251.000 122.0 96.259 5.060 -999.990 -999.990 0.963 ..P WKT 2010 07 22 06 04 55 31.3200 -97.3300 251.000 457.0 72.450 3.570 -999.990 -999.990 0.725 ..P WKT 2010 07 22 06 14 55 31.3200 -97.3300 251.000 30.0 100.711 3.370 -999.990 -999.990 1.007 ..P WKT 2010 07 22 06 19 55 31.3200 -97.3300 251.000 122.0 101.820 3.100 -999.990 -999.990 1.018 ..P WKT 2010 07 22 06 24 55 31.3200 -97.3300 251.000 457.0 72.713 4.080 -999.990 -999.990 0.727 ..P WKT 2010 07 22 06 29 55 31.3200 -97.3300 251.000 30.0 95.926 4.320 -999.990 -999.990 0.959 ..P WKT 2010 07 22 06 34 55 31.3200 -97.3300 251.000 122.0 100.951 4.140 -999.990 -999.990 1.010 ..P WKT 2010 07 22 06 39 55 31.3200 -97.3300 251.000 457.0 73.539 4.500 -999.990 -999.990 0.735 ..P WKT 2010 07 22 06 49 55 31.3200 -97.3300 251.000 30.0 98.985 3.540 -999.990 -999.990 0.990 ..P WKT 2010 07 22 06 54 55 31.3200 -97.3300 251.000 122.0 116.879 3.810 -999.990 -999.990 1.169 ..P WKT 2010 07 22 06 59 55 31.3200 -97.3300 251.000 457.0 83.918 4.990 -999.990 -999.990 0.839 ..P WKT 2010 07 22 07 04 55 31.3200 -97.3300 251.000 30.0 94.966 4.520 -999.990 -999.990 0.950 ..P WKT 2010 07 22 07 09 55 31.3200 -97.3300 251.000 122.0 133.934 4.020 -999.990 -999.990 1.339 ..P WKT 2010 07 22 07 14 55 31.3200 -97.3300 251.000 457.0 77.258 3.730 -999.990 -999.990 0.773 ..P WKT 2010 07 22 07 24 55 31.3200 -97.3300 251.000 30.0 114.626 4.100 -999.990 -999.990 1.146 ..P WKT 2010 07 22 07 29 55 31.3200 -97.3300 251.000 122.0 171.218 3.450 -999.990 -999.990 1.712 ..P WKT 2010 07 22 07 34 55 31.3200 -97.3300 251.000 457.0 80.765 3.270 -999.990 -999.990 0.808 ..P WKT 2010 07 22 07 39 55 31.3200 -97.3300 251.000 30.0 121.860 3.290 -999.990 -999.990 1.219 ..P WKT 2010 07 22 07 44 55 31.3200 -97.3300 251.000 122.0 133.099 4.370 -999.990 -999.990 1.331 ..P WKT 2010 07 22 07 49 55 31.3200 -97.3300 251.000 457.0 74.354 3.980 -999.990 -999.990 0.744 ..P WKT 2010 07 22 07 59 55 31.3200 -97.3300 251.000 30.0 117.005 4.020 -999.990 -999.990 1.170 ..P WKT 2010 07 22 08 04 55 31.3200 -97.3300 251.000 122.0 104.374 4.310 -999.990 -999.990 1.044 ..P WKT 2010 07 22 08 09 55 31.3200 -97.3300 251.000 457.0 85.062 4.410 -999.990 -999.990 0.851 ..P WKT 2010 07 22 08 14 55 31.3200 -97.3300 251.000 30.0 116.587 4.680 -999.990 -999.990 1.166 ..P WKT 2010 07 22 08 19 55 31.3200 -97.3300 251.000 122.0 108.141 4.160 -999.990 -999.990 1.081 ..P WKT 2010 07 22 08 24 55 31.3200 -97.3300 251.000 457.0 75.894 4.810 -999.990 -999.990 0.759 ..P WKT 2010 07 22 08 34 55 31.3200 -97.3300 251.000 30.0 110.751 7.150 -999.990 -999.990 1.108 ..P WKT 2010 07 22 08 39 55 31.3200 -97.3300 251.000 122.0 97.264 4.810 -999.990 -999.990 0.973 ..P WKT 2010 07 22 08 44 55 31.3200 -97.3300 251.000 457.0 75.994 4.100 -999.990 -999.990 0.760 ..P WKT 2010 07 22 08 49 55 31.3200 -97.3300 251.000 30.0 110.774 4.250 -999.990 -999.990 1.108 ..P WKT 2010 07 22 08 54 55 31.3200 -97.3300 251.000 122.0 94.933 3.950 -999.990 -999.990 0.949 ..P WKT 2010 07 22 08 59 55 31.3200 -97.3300 251.000 457.0 77.985 3.460 -999.990 -999.990 0.780 ..P WKT 2010 07 22 09 09 55 31.3200 -97.3300 251.000 30.0 107.550 3.660 -999.990 -999.990 1.075 ..P WKT 2010 07 22 09 14 55 31.3200 -97.3300 251.000 122.0 91.385 3.520 -999.990 -999.990 0.914 ..P WKT 2010 07 22 09 19 55 31.3200 -97.3300 251.000 457.0 73.837 3.160 -999.990 -999.990 0.738 ..P WKT 2010 07 22 09 24 55 31.3200 -97.3300 251.000 30.0 103.787 4.670 -999.990 -999.990 1.038 ..P WKT 2010 07 22 09 29 55 31.3200 -97.3300 251.000 122.0 95.129 4.060 -999.990 -999.990 0.951 ..P WKT 2010 07 22 09 34 55 31.3200 -97.3300 251.000 457.0 82.589 3.710 -999.990 -999.990 0.826 ..P WKT 2010 07 22 09 44 55 31.3200 -97.3300 251.000 30.0 109.969 4.200 -999.990 -999.990 1.100 ..P WKT 2010 07 22 09 49 55 31.3200 -97.3300 251.000 122.0 91.329 3.430 -999.990 -999.990 0.913 ..P WKT 2010 07 22 09 54 55 31.3200 -97.3300 251.000 457.0 76.580 5.460 -999.990 -999.990 0.766 ..P WKT 2010 07 22 09 59 55 31.3200 -97.3300 251.000 30.0 104.268 3.290 -999.990 -999.990 1.043 ..P WKT 2010 07 22 10 04 55 31.3200 -97.3300 251.000 122.0 92.573 2.850 -999.990 -999.990 0.926 ..P WKT 2010 07 22 10 09 55 31.3200 -97.3300 251.000 457.0 83.378 3.110 -999.990 -999.990 0.834 ..P WKT 2010 07 22 10 19 55 31.3200 -97.3300 251.000 30.0 108.976 3.300 -999.990 -999.990 1.090 ..P WKT 2010 07 22 10 24 55 31.3200 -97.3300 251.000 122.0 99.427 2.850 -999.990 -999.990 0.994 ..P WKT 2010 07 22 10 29 55 31.3200 -97.3300 251.000 457.0 84.065 4.240 -999.990 -999.990 0.841 ..P WKT 2010 07 22 10 34 55 31.3200 -97.3300 251.000 30.0 106.371 3.580 -999.990 -999.990 1.064 ..P WKT 2010 07 22 10 39 55 31.3200 -97.3300 251.000 122.0 93.228 2.830 -999.990 -999.990 0.932 ..P WKT 2010 07 22 10 44 55 31.3200 -97.3300 251.000 457.0 136.007 3.470 -999.990 -999.990 1.360 ..P WKT 2010 07 22 10 54 55 31.3200 -97.3300 251.000 30.0 107.848 3.340 -999.990 -999.990 1.078 ..P WKT 2010 07 22 10 59 55 31.3200 -97.3300 251.000 122.0 95.605 2.890 -999.990 -999.990 0.956 ..P WKT 2010 07 22 11 04 55 31.3200 -97.3300 251.000 457.0 132.876 6.070 -999.990 -999.990 1.329 ..P WKT 2010 07 22 11 09 55 31.3200 -97.3300 251.000 30.0 106.392 3.300 -999.990 -999.990 1.064 ..P WKT 2010 07 22 11 14 55 31.3200 -97.3300 251.000 122.0 99.272 2.990 -999.990 -999.990 0.993 ..P WKT 2010 07 22 11 19 55 31.3200 -97.3300 251.000 457.0 90.635 3.670 -999.990 -999.990 0.906 ..P WKT 2010 07 22 11 29 55 31.3200 -97.3300 251.000 30.0 109.314 3.280 -999.990 -999.990 1.093 ..P WKT 2010 07 22 11 34 55 31.3200 -97.3300 251.000 122.0 105.262 3.120 -999.990 -999.990 1.053 ..P WKT 2010 07 22 11 39 55 31.3200 -97.3300 251.000 457.0 89.474 3.940 -999.990 -999.990 0.895 ..P WKT 2010 07 22 11 44 55 31.3200 -97.3300 251.000 30.0 115.526 2.880 -999.990 -999.990 1.155 ..P WKT 2010 07 22 11 49 55 31.3200 -97.3300 251.000 122.0 105.817 3.400 -999.990 -999.990 1.058 ..P WKT 2010 07 22 12 09 55 31.3200 -97.3300 251.000 457.0 69.519 3.660 -999.990 -999.990 0.695 ..P WKT 2010 07 22 12 10 25 31.3200 -97.3300 251.000 457.0 73.933 2.940 -999.990 -999.990 0.739 ..P WKT 2010 07 22 12 10 55 31.3200 -97.3300 251.000 457.0 70.208 2.760 -999.990 -999.990 0.702 ..P WKT 2010 07 22 12 11 25 31.3200 -97.3300 251.000 457.0 72.690 2.460 -999.990 -999.990 0.727 ..P WKT 2010 07 22 12 11 55 31.3200 -97.3300 251.000 457.0 75.310 3.240 -999.990 -999.990 0.753 ..P WKT 2010 07 22 12 12 25 31.3200 -97.3300 251.000 457.0 78.483 3.200 -999.990 -999.990 0.785 ..P WKT 2010 07 22 12 12 55 31.3200 -97.3300 251.000 457.0 80.414 2.960 -999.990 -999.990 0.804 ..P WKT 2010 07 22 12 13 25 31.3200 -97.3300 251.000 457.0 76.826 2.480 -999.990 -999.990 0.768 ..P WKT 2010 07 22 12 13 55 31.3200 -97.3300 251.000 457.0 79.723 2.670 -999.990 -999.990 0.797 ..P WKT 2010 07 22 12 14 25 31.3200 -97.3300 251.000 457.0 78.066 2.750 -999.990 -999.990 0.781 ..P WKT 2010 07 22 12 14 55 31.3200 -97.3300 251.000 457.0 79.169 2.640 -999.990 -999.990 0.792 ..P WKT 2010 07 22 12 19 55 31.3200 -97.3300 251.000 30.0 122.340 3.130 -999.990 -999.990 1.223 ..P WKT 2010 07 22 12 24 55 31.3200 -97.3300 251.000 122.0 94.052 4.940 -999.990 -999.990 0.941 ..P WKT 2010 07 22 12 29 55 31.3200 -97.3300 251.000 457.0 82.595 2.740 -999.990 -999.990 0.826 ..P WKT 2010 07 22 12 34 55 31.3200 -97.3300 251.000 30.0 124.378 3.810 -999.990 -999.990 1.244 ..P WKT 2010 07 22 12 39 55 31.3200 -97.3300 251.000 122.0 113.748 2.830 -999.990 -999.990 1.137 ..P WKT 2010 07 22 12 44 55 31.3200 -97.3300 251.000 457.0 80.089 2.720 -999.990 -999.990 0.801 ..P WKT 2010 07 22 12 54 55 31.3200 -97.3300 251.000 30.0 118.604 3.650 -999.990 -999.990 1.186 ..P WKT 2010 07 22 12 59 55 31.3200 -97.3300 251.000 122.0 117.550 2.680 -999.990 -999.990 1.175 ..P WKT 2010 07 22 13 04 55 31.3200 -97.3300 251.000 457.0 77.341 3.010 -999.990 -999.990 0.773 ..P WKT 2010 07 22 13 09 55 31.3200 -97.3300 251.000 30.0 111.582 3.000 -999.990 -999.990 1.116 ..P WKT 2010 07 22 13 14 55 31.3200 -97.3300 251.000 122.0 97.571 3.010 -999.990 -999.990 0.976 ..P WKT 2010 07 22 13 19 55 31.3200 -97.3300 251.000 457.0 210.103 3.600 -999.990 -999.990 2.101 ..P WKT 2010 07 22 13 29 55 31.3200 -97.3300 251.000 30.0 100.183 3.510 -999.990 -999.990 1.002 ..P WKT 2010 07 22 13 34 55 31.3200 -97.3300 251.000 122.0 110.412 3.230 -999.990 -999.990 1.104 ..P WKT 2010 07 22 13 39 55 31.3200 -97.3300 251.000 457.0 74.611 3.330 -999.990 -999.990 0.746 ..P WKT 2010 07 22 13 44 55 31.3200 -97.3300 251.000 30.0 101.928 2.760 -999.990 -999.990 1.019 ..P WKT 2010 07 22 13 49 55 31.3200 -97.3300 251.000 122.0 97.825 2.850 -999.990 -999.990 0.978 ..P WKT 2010 07 22 13 54 55 31.3200 -97.3300 251.000 457.0 89.589 4.770 -999.990 -999.990 0.896 ..P WKT 2010 07 22 14 04 55 31.3200 -97.3300 251.000 30.0 94.611 3.270 -999.990 -999.990 0.946 ..P WKT 2010 07 22 14 09 55 31.3200 -97.3300 251.000 122.0 100.978 2.790 -999.990 -999.990 1.010 ..P WKT 2010 07 22 14 14 55 31.3200 -97.3300 251.000 457.0 85.581 2.450 -999.990 -999.990 0.856 ..P WKT 2010 07 22 14 19 55 31.3200 -97.3300 251.000 30.0 99.937 3.960 -999.990 -999.990 0.999 ..P WKT 2010 07 22 14 24 55 31.3200 -97.3300 251.000 122.0 101.345 2.860 -999.990 -999.990 1.013 ..P WKT 2010 07 22 14 29 55 31.3200 -97.3300 251.000 457.0 85.950 2.760 -999.990 -999.990 0.860 ..P WKT 2010 07 22 14 39 55 31.3200 -97.3300 251.000 30.0 91.658 2.300 -999.990 -999.990 0.917 ..P WKT 2010 07 22 14 44 55 31.3200 -97.3300 251.000 122.0 106.974 2.890 -999.990 -999.990 1.070 ..P WKT 2010 07 22 14 49 55 31.3200 -97.3300 251.000 457.0 88.554 2.660 -999.990 -999.990 0.886 ..P WKT 2010 07 22 14 54 55 31.3200 -97.3300 251.000 30.0 89.273 3.480 -999.990 -999.990 0.893 ..P WKT 2010 07 22 14 59 55 31.3200 -97.3300 251.000 122.0 89.994 2.580 -999.990 -999.990 0.900 ..P WKT 2010 07 22 15 04 55 31.3200 -97.3300 251.000 457.0 84.380 2.550 -999.990 -999.990 0.844 ..P WKT 2010 07 22 15 14 55 31.3200 -97.3300 251.000 30.0 81.042 2.700 -999.990 -999.990 0.810 ..P WKT 2010 07 22 15 19 55 31.3200 -97.3300 251.000 122.0 92.949 2.740 -999.990 -999.990 0.929 ..P WKT 2010 07 22 15 24 55 31.3200 -97.3300 251.000 457.0 84.074 3.020 -999.990 -999.990 0.841 ..P WKT 2010 07 22 15 29 55 31.3200 -97.3300 251.000 30.0 89.787 3.040 -999.990 -999.990 0.898 ..P WKT 2010 07 22 15 34 55 31.3200 -97.3300 251.000 122.0 90.957 2.710 -999.990 -999.990 0.910 ..P WKT 2010 07 22 15 39 55 31.3200 -97.3300 251.000 457.0 84.836 2.750 -999.990 -999.990 0.848 ..P WKT 2010 07 22 15 49 55 31.3200 -97.3300 251.000 30.0 91.306 4.230 -999.990 -999.990 0.913 ..P WKT 2010 07 22 15 54 55 31.3200 -97.3300 251.000 122.0 103.621 3.300 -999.990 -999.990 1.036 ..P WKT 2010 07 22 15 59 55 31.3200 -97.3300 251.000 457.0 88.420 3.640 -999.990 -999.990 0.884 ..P WKT 2010 07 22 16 04 55 31.3200 -97.3300 251.000 30.0 88.629 3.840 -999.990 -999.990 0.886 ..P WKT 2010 07 22 16 09 55 31.3200 -97.3300 251.000 122.0 91.313 3.540 -999.990 -999.990 0.913 ..P WKT 2010 07 22 16 14 55 31.3200 -97.3300 251.000 457.0 87.257 2.900 -999.990 -999.990 0.873 ..P WKT 2010 07 22 16 24 55 31.3200 -97.3300 251.000 30.0 91.346 2.880 -999.990 -999.990 0.913 ..P WKT 2010 07 22 16 29 55 31.3200 -97.3300 251.000 122.0 92.203 3.760 -999.990 -999.990 0.922 ..P WKT 2010 07 22 16 34 55 31.3200 -97.3300 251.000 457.0 84.670 3.800 -999.990 -999.990 0.847 ..P WKT 2010 07 22 16 39 55 31.3200 -97.3300 251.000 30.0 78.789 3.650 -999.990 -999.990 0.788 ..P WKT 2010 07 22 16 44 55 31.3200 -97.3300 251.000 122.0 91.471 3.990 -999.990 -999.990 0.915 ..P WKT 2010 07 22 16 49 55 31.3200 -97.3300 251.000 457.0 82.840 3.420 -999.990 -999.990 0.828 ..P WKT 2010 07 22 17 04 55 31.3200 -97.3300 251.000 30.0 83.406 3.710 -999.990 -999.990 0.834 ..P WKT 2010 07 22 17 09 55 31.3200 -97.3300 251.000 122.0 89.240 3.610 -999.990 -999.990 0.892 ..P WKT 2010 07 22 17 14 55 31.3200 -97.3300 251.000 457.0 78.855 3.740 -999.990 -999.990 0.789 ..P WKT 2010 07 22 17 19 55 31.3200 -97.3300 251.000 30.0 81.115 3.060 -999.990 -999.990 0.811 ..P WKT 2010 07 22 17 24 55 31.3200 -97.3300 251.000 122.0 91.620 3.810 -999.990 -999.990 0.916 ..P WKT 2010 07 22 17 29 55 31.3200 -97.3300 251.000 457.0 75.465 3.100 -999.990 -999.990 0.755 ..P WKT 2010 07 22 17 39 55 31.3200 -97.3300 251.000 30.0 77.090 2.390 -999.990 -999.990 0.771 ..P WKT 2010 07 22 17 44 55 31.3200 -97.3300 251.000 122.0 81.950 3.300 -999.990 -999.990 0.820 ..P WKT 2010 07 22 17 49 55 31.3200 -97.3300 251.000 457.0 79.391 2.520 -999.990 -999.990 0.794 ..P WKT 2010 07 22 17 54 55 31.3200 -97.3300 251.000 30.0 81.778 2.920 -999.990 -999.990 0.818 ..P WKT 2010 07 22 17 59 55 31.3200 -97.3300 251.000 122.0 84.164 2.350 -999.990 -999.990 0.842 ..P WKT 2010 07 22 18 04 55 31.3200 -97.3300 251.000 457.0 74.737 2.660 -999.990 -999.990 0.747 ..P WKT 2010 07 22 18 14 55 31.3200 -97.3300 251.000 30.0 78.666 2.610 -999.990 -999.990 0.787 ..P WKT 2010 07 22 18 19 55 31.3200 -97.3300 251.000 122.0 93.667 3.700 -999.990 -999.990 0.937 ..P WKT 2010 07 22 18 24 55 31.3200 -97.3300 251.000 457.0 78.456 3.090 -999.990 -999.990 0.785 ..P WKT 2010 07 22 18 29 55 31.3200 -97.3300 251.000 30.0 80.272 3.530 -999.990 -999.990 0.803 ..P WKT 2010 07 22 18 34 55 31.3200 -97.3300 251.000 122.0 88.405 3.240 -999.990 -999.990 0.884 ..P WKT 2010 07 22 18 39 55 31.3200 -97.3300 251.000 457.0 79.787 2.640 -999.990 -999.990 0.798 ..P WKT 2010 07 22 18 49 55 31.3200 -97.3300 251.000 30.0 82.556 3.100 -999.990 -999.990 0.826 ..P WKT 2010 07 22 18 54 55 31.3200 -97.3300 251.000 122.0 81.725 3.310 -999.990 -999.990 0.817 ..P WKT 2010 07 22 18 59 55 31.3200 -97.3300 251.000 457.0 78.972 3.270 -999.990 -999.990 0.790 ..P WKT 2010 07 22 19 04 55 31.3200 -97.3300 251.000 30.0 77.455 3.350 -999.990 -999.990 0.775 ..P WKT 2010 07 22 19 09 55 31.3200 -97.3300 251.000 122.0 92.406 5.240 -999.990 -999.990 0.924 ..P WKT 2010 07 22 19 14 55 31.3200 -97.3300 251.000 457.0 83.478 4.170 -999.990 -999.990 0.835 ..P WKT 2010 07 22 19 24 55 31.3200 -97.3300 251.000 30.0 87.794 4.410 -999.990 -999.990 0.878 ..P WKT 2010 07 22 19 29 55 31.3200 -97.3300 251.000 122.0 93.216 4.210 -999.990 -999.990 0.932 ..P WKT 2010 07 22 19 34 55 31.3200 -97.3300 251.000 457.0 85.465 4.150 -999.990 -999.990 0.855 ..P WKT 2010 07 22 19 39 55 31.3200 -97.3300 251.000 30.0 97.471 4.680 -999.990 -999.990 0.975 ..P WKT 2010 07 22 19 44 55 31.3200 -97.3300 251.000 122.0 100.285 5.210 -999.990 -999.990 1.003 ..P WKT 2010 07 22 19 49 55 31.3200 -97.3300 251.000 457.0 92.673 4.780 -999.990 -999.990 0.927 ..P WKT 2010 07 22 19 59 55 31.3200 -97.3300 251.000 30.0 92.597 4.830 -999.990 -999.990 0.926 ..P WKT 2010 07 22 20 04 55 31.3200 -97.3300 251.000 122.0 95.332 4.420 -999.990 -999.990 0.953 ..P WKT 2010 07 22 20 09 55 31.3200 -97.3300 251.000 457.0 88.329 4.220 -999.990 -999.990 0.883 ..P WKT 2010 07 22 20 14 55 31.3200 -97.3300 251.000 30.0 88.184 4.080 -999.990 -999.990 0.882 ..P WKT 2010 07 22 20 19 55 31.3200 -97.3300 251.000 122.0 96.129 4.160 -999.990 -999.990 0.961 ..P WKT 2010 07 22 20 24 55 31.3200 -97.3300 251.000 457.0 86.934 4.600 -999.990 -999.990 0.869 ..P WKT 2010 07 22 20 34 55 31.3200 -97.3300 251.000 30.0 87.682 4.490 -999.990 -999.990 0.877 ..P WKT 2010 07 22 20 39 55 31.3200 -97.3300 251.000 122.0 98.994 3.580 -999.990 -999.990 0.990 ..P WKT 2010 07 22 20 44 55 31.3200 -97.3300 251.000 457.0 89.193 2.960 -999.990 -999.990 0.892 ..P WKT 2010 07 22 20 49 55 31.3200 -97.3300 251.000 30.0 91.045 3.730 -999.990 -999.990 0.910 ..P WKT 2010 07 22 20 54 55 31.3200 -97.3300 251.000 122.0 98.654 3.860 -999.990 -999.990 0.987 ..P WKT 2010 07 22 20 59 55 31.3200 -97.3300 251.000 457.0 81.318 2.490 -999.990 -999.990 0.813 ..P WKT 2010 07 22 21 09 55 31.3200 -97.3300 251.000 30.0 93.224 2.630 -999.990 -999.990 0.932 ..P WKT 2010 07 22 21 14 55 31.3200 -97.3300 251.000 122.0 99.716 3.650 -999.990 -999.990 0.997 ..P WKT 2010 07 22 21 19 55 31.3200 -97.3300 251.000 457.0 84.830 4.010 -999.990 -999.990 0.848 ..P WKT 2010 07 22 21 24 55 31.3200 -97.3300 251.000 30.0 90.224 5.170 -999.990 -999.990 0.902 ..P WKT 2010 07 22 21 29 55 31.3200 -97.3300 251.000 122.0 92.330 4.520 -999.990 -999.990 0.923 ..P WKT 2010 07 22 21 34 55 31.3200 -97.3300 251.000 457.0 80.735 3.650 -999.990 -999.990 0.807 ..P WKT 2010 07 22 21 44 55 31.3200 -97.3300 251.000 30.0 82.677 3.950 -999.990 -999.990 0.827 ..P WKT 2010 07 22 21 49 55 31.3200 -97.3300 251.000 122.0 88.266 4.150 -999.990 -999.990 0.883 ..P WKT 2010 07 22 21 54 55 31.3200 -97.3300 251.000 457.0 83.445 4.770 -999.990 -999.990 0.834 ..P WKT 2010 07 22 21 59 55 31.3200 -97.3300 251.000 30.0 85.745 3.850 -999.990 -999.990 0.857 ..P WKT 2010 07 22 22 04 55 31.3200 -97.3300 251.000 122.0 89.415 3.190 -999.990 -999.990 0.894 ..P WKT 2010 07 22 22 09 55 31.3200 -97.3300 251.000 457.0 86.512 3.330 -999.990 -999.990 0.865 ..P WKT 2010 07 22 22 19 55 31.3200 -97.3300 251.000 30.0 85.224 3.400 -999.990 -999.990 0.852 ..P WKT 2010 07 22 22 24 55 31.3200 -97.3300 251.000 122.0 93.138 3.680 -999.990 -999.990 0.931 ..P WKT 2010 07 22 22 29 55 31.3200 -97.3300 251.000 457.0 82.705 3.620 -999.990 -999.990 0.827 ..P WKT 2010 07 22 22 34 55 31.3200 -97.3300 251.000 30.0 89.249 4.140 -999.990 -999.990 0.892 ..P WKT 2010 07 22 22 39 55 31.3200 -97.3300 251.000 122.0 94.149 4.890 -999.990 -999.990 0.941 ..P WKT 2010 07 22 22 44 55 31.3200 -97.3300 251.000 457.0 89.194 3.620 -999.990 -999.990 0.892 ..P WKT 2010 07 22 22 54 55 31.3200 -97.3300 251.000 30.0 88.337 4.490 -999.990 -999.990 0.883 ..P WKT 2010 07 22 22 59 55 31.3200 -97.3300 251.000 122.0 101.056 3.520 -999.990 -999.990 1.011 ..P WKT 2010 07 22 23 04 55 31.3200 -97.3300 251.000 457.0 91.605 3.280 -999.990 -999.990 0.916 ..P WKT 2010 07 22 23 09 55 31.3200 -97.3300 251.000 30.0 95.975 3.700 -999.990 -999.990 0.960 ..P WKT 2010 07 22 23 14 55 31.3200 -97.3300 251.000 122.0 96.103 3.740 -999.990 -999.990 0.961 ..P WKT 2010 07 22 23 19 55 31.3200 -97.3300 251.000 457.0 84.192 3.710 -999.990 -999.990 0.842 ..P WKT 2010 07 22 23 29 55 31.3200 -97.3300 251.000 30.0 91.717 3.080 -999.990 -999.990 0.917 ..P WKT 2010 07 22 23 34 55 31.3200 -97.3300 251.000 122.0 100.344 3.480 -999.990 -999.990 1.003 ..P WKT 2010 07 22 23 39 55 31.3200 -97.3300 251.000 457.0 92.830 3.090 -999.990 -999.990 0.928 ..P WKT 2010 07 22 23 44 55 31.3200 -97.3300 251.000 30.0 89.555 3.690 -999.990 -999.990 0.896 ..P WKT 2010 07 22 23 49 55 31.3200 -97.3300 251.000 122.0 105.703 3.220 -999.990 -999.990 1.057 ..P WKT 2010 07 23 00 09 55 31.3200 -97.3300 251.000 457.0 97.293 3.870 -999.990 -999.990 0.973 ..P WKT 2010 07 23 00 10 25 31.3200 -97.3300 251.000 457.0 100.577 3.550 -999.990 -999.990 1.006 ..P WKT 2010 07 23 00 10 55 31.3200 -97.3300 251.000 457.0 102.357 4.090 -999.990 -999.990 1.024 ..P WKT 2010 07 23 00 11 25 31.3200 -97.3300 251.000 457.0 109.470 4.470 -999.990 -999.990 1.095 ..P WKT 2010 07 23 00 11 55 31.3200 -97.3300 251.000 457.0 113.710 4.260 -999.990 -999.990 1.137 ..P WKT 2010 07 23 00 12 25 31.3200 -97.3300 251.000 457.0 101.133 4.740 -999.990 -999.990 1.011 ..P WKT 2010 07 23 00 12 55 31.3200 -97.3300 251.000 457.0 97.990 3.470 -999.990 -999.990 0.980 ..P WKT 2010 07 23 00 13 25 31.3200 -97.3300 251.000 457.0 102.094 3.390 -999.990 -999.990 1.021 ..P WKT 2010 07 23 00 13 55 31.3200 -97.3300 251.000 457.0 105.924 3.340 -999.990 -999.990 1.059 ..P WKT 2010 07 23 00 14 25 31.3200 -97.3300 251.000 457.0 101.824 3.950 -999.990 -999.990 1.018 ..P WKT 2010 07 23 00 14 55 31.3200 -97.3300 251.000 457.0 98.819 4.380 -999.990 -999.990 0.988 ..P WKT 2010 07 23 00 19 55 31.3200 -97.3300 251.000 30.0 101.984 3.440 -999.990 -999.990 1.020 ..P WKT 2010 07 23 00 24 55 31.3200 -97.3300 251.000 122.0 109.661 3.550 -999.990 -999.990 1.097 ..P WKT 2010 07 23 00 29 55 31.3200 -97.3300 251.000 457.0 109.681 3.500 -999.990 -999.990 1.097 ..P WKT 2010 07 23 00 34 55 31.3200 -97.3300 251.000 30.0 110.522 3.650 -999.990 -999.990 1.105 ..P WKT 2010 07 23 00 39 55 31.3200 -97.3300 251.000 122.0 117.515 3.970 -999.990 -999.990 1.175 ..P WKT 2010 07 23 00 44 55 31.3200 -97.3300 251.000 457.0 108.922 4.140 -999.990 -999.990 1.089 ..P WKT 2010 07 23 00 54 55 31.3200 -97.3300 251.000 30.0 105.041 3.470 -999.990 -999.990 1.050 ..P WKT 2010 07 23 00 59 55 31.3200 -97.3300 251.000 122.0 110.437 3.880 -999.990 -999.990 1.104 ..P WKT 2010 07 23 01 04 55 31.3200 -97.3300 251.000 457.0 99.700 3.980 -999.990 -999.990 0.997 ..P WKT 2010 07 23 01 09 55 31.3200 -97.3300 251.000 30.0 104.822 4.270 -999.990 -999.990 1.048 ..P WKT 2010 07 23 01 14 55 31.3200 -97.3300 251.000 122.0 109.397 4.000 -999.990 -999.990 1.094 ..P WKT 2010 07 23 01 19 55 31.3200 -97.3300 251.000 457.0 95.108 3.110 -999.990 -999.990 0.951 ..P WKT 2010 07 23 01 29 55 31.3200 -97.3300 251.000 30.0 110.193 2.790 -999.990 -999.990 1.102 ..P WKT 2010 07 23 01 34 55 31.3200 -97.3300 251.000 122.0 115.236 3.270 -999.990 -999.990 1.152 ..P WKT 2010 07 23 01 39 55 31.3200 -97.3300 251.000 457.0 108.524 3.900 -999.990 -999.990 1.085 ..P WKT 2010 07 23 01 44 55 31.3200 -97.3300 251.000 30.0 111.107 3.290 -999.990 -999.990 1.111 ..P WKT 2010 07 23 01 49 55 31.3200 -97.3300 251.000 122.0 112.595 3.520 -999.990 -999.990 1.126 ..P WKT 2010 07 23 01 54 55 31.3200 -97.3300 251.000 457.0 105.610 2.720 -999.990 -999.990 1.056 ..P WKT 2010 07 23 02 04 55 31.3200 -97.3300 251.000 30.0 115.812 3.000 -999.990 -999.990 1.158 ..P WKT 2010 07 23 02 09 55 31.3200 -97.3300 251.000 122.0 110.312 3.020 -999.990 -999.990 1.103 ..P WKT 2010 07 23 02 14 55 31.3200 -97.3300 251.000 457.0 100.712 3.630 -999.990 -999.990 1.007 ..P WKT 2010 07 23 02 19 55 31.3200 -97.3300 251.000 30.0 100.951 3.160 -999.990 -999.990 1.010 ..P WKT 2010 07 23 02 24 55 31.3200 -97.3300 251.000 122.0 101.737 3.620 -999.990 -999.990 1.017 ..P WKT 2010 07 23 02 29 55 31.3200 -97.3300 251.000 457.0 99.517 2.740 -999.990 -999.990 0.995 ..P WKT 2010 07 23 02 39 55 31.3200 -97.3300 251.000 30.0 91.485 3.320 -999.990 -999.990 0.915 ..P WKT 2010 07 23 02 44 55 31.3200 -97.3300 251.000 122.0 91.686 3.520 -999.990 -999.990 0.917 ..P WKT 2010 07 23 02 49 55 31.3200 -97.3300 251.000 457.0 99.265 3.140 -999.990 -999.990 0.993 ..P WKT 2010 07 23 02 54 55 31.3200 -97.3300 251.000 30.0 89.355 2.780 -999.990 -999.990 0.894 ..P WKT 2010 07 23 02 59 55 31.3200 -97.3300 251.000 122.0 84.090 3.140 -999.990 -999.990 0.841 ..P WKT 2010 07 23 03 04 55 31.3200 -97.3300 251.000 457.0 97.544 3.120 -999.990 -999.990 0.975 ..P WKT 2010 07 23 03 14 55 31.3200 -97.3300 251.000 30.0 82.488 3.290 -999.990 -999.990 0.825 ..P WKT 2010 07 23 03 19 55 31.3200 -97.3300 251.000 122.0 86.357 3.200 -999.990 -999.990 0.864 ..P WKT 2010 07 23 03 24 55 31.3200 -97.3300 251.000 457.0 77.386 3.560 -999.990 -999.990 0.774 ..P WKT 2010 07 23 03 29 55 31.3200 -97.3300 251.000 30.0 84.534 4.370 -999.990 -999.990 0.845 ..P WKT 2010 07 23 03 34 55 31.3200 -97.3300 251.000 122.0 96.601 2.720 -999.990 -999.990 0.966 ..P WKT 2010 07 23 03 39 55 31.3200 -97.3300 251.000 457.0 74.515 3.410 -999.990 -999.990 0.745 ..P WKT 2010 07 23 03 49 55 31.3200 -97.3300 251.000 30.0 84.167 2.560 -999.990 -999.990 0.842 ..P WKT 2010 07 23 03 54 55 31.3200 -97.3300 251.000 122.0 84.348 2.960 -999.990 -999.990 0.843 ..P WKT 2010 07 23 03 59 55 31.3200 -97.3300 251.000 457.0 76.334 3.200 -999.990 -999.990 0.763 ..P WKT 2010 07 23 04 04 55 31.3200 -97.3300 251.000 30.0 85.530 3.660 -999.990 -999.990 0.855 ..P WKT 2010 07 23 04 09 55 31.3200 -97.3300 251.000 122.0 86.531 3.980 -999.990 -999.990 0.865 ..P WKT 2010 07 23 04 14 55 31.3200 -97.3300 251.000 457.0 76.332 2.650 -999.990 -999.990 0.763 ..P WKT 2010 07 23 04 24 55 31.3200 -97.3300 251.000 30.0 85.240 3.110 -999.990 -999.990 0.852 ..P WKT 2010 07 23 04 29 55 31.3200 -97.3300 251.000 122.0 88.231 3.670 -999.990 -999.990 0.882 ..P WKT 2010 07 23 04 34 55 31.3200 -97.3300 251.000 457.0 67.459 3.620 -999.990 -999.990 0.675 ..P WKT 2010 07 23 04 39 55 31.3200 -97.3300 251.000 30.0 80.556 3.970 -999.990 -999.990 0.806 ..P WKT 2010 07 23 04 44 55 31.3200 -97.3300 251.000 122.0 85.731 3.950 -999.990 -999.990 0.857 ..P WKT 2010 07 23 04 49 55 31.3200 -97.3300 251.000 457.0 70.696 3.730 -999.990 -999.990 0.707 ..P WKT 2010 07 23 05 04 55 31.3200 -97.3300 251.000 30.0 80.663 4.190 -999.990 -999.990 0.807 ..P WKT 2010 07 23 05 09 55 31.3200 -97.3300 251.000 122.0 81.966 4.100 -999.990 -999.990 0.820 ..P WKT 2010 07 23 05 14 55 31.3200 -97.3300 251.000 457.0 76.441 4.040 -999.990 -999.990 0.764 ..P WKT 2010 07 23 05 19 55 31.3200 -97.3300 251.000 30.0 75.287 3.000 -999.990 -999.990 0.753 ..P WKT 2010 07 23 05 24 55 31.3200 -97.3300 251.000 122.0 90.243 2.880 -999.990 -999.990 0.902 ..P WKT 2010 07 23 05 29 55 31.3200 -97.3300 251.000 457.0 77.073 2.690 -999.990 -999.990 0.771 ..P WKT 2010 07 23 05 39 55 31.3200 -97.3300 251.000 30.0 87.548 2.840 -999.990 -999.990 0.875 ..P WKT 2010 07 23 05 44 55 31.3200 -97.3300 251.000 122.0 90.167 2.530 -999.990 -999.990 0.902 ..P WKT 2010 07 23 05 49 55 31.3200 -97.3300 251.000 457.0 77.769 3.590 -999.990 -999.990 0.778 ..P WKT 2010 07 23 05 54 55 31.3200 -97.3300 251.000 30.0 88.306 3.990 -999.990 -999.990 0.883 ..P WKT 2010 07 23 05 59 55 31.3200 -97.3300 251.000 122.0 89.014 3.540 -999.990 -999.990 0.890 ..P WKT 2010 07 23 06 04 55 31.3200 -97.3300 251.000 457.0 76.616 3.200 -999.990 -999.990 0.766 ..P WKT 2010 07 23 06 14 55 31.3200 -97.3300 251.000 30.0 85.560 1.880 -999.990 -999.990 0.856 ..P WKT 2010 07 23 06 19 55 31.3200 -97.3300 251.000 122.0 94.613 2.510 -999.990 -999.990 0.946 ..P WKT 2010 07 23 06 24 55 31.3200 -97.3300 251.000 457.0 76.094 2.950 -999.990 -999.990 0.761 ..P WKT 2010 07 23 06 29 55 31.3200 -97.3300 251.000 30.0 85.694 2.160 -999.990 -999.990 0.857 ..P WKT 2010 07 23 06 34 55 31.3200 -97.3300 251.000 122.0 89.286 2.010 -999.990 -999.990 0.893 ..P WKT 2010 07 23 06 39 55 31.3200 -97.3300 251.000 457.0 87.284 2.460 -999.990 -999.990 0.873 ..P WKT 2010 07 23 06 49 55 31.3200 -97.3300 251.000 30.0 95.094 2.340 -999.990 -999.990 0.951 ..P WKT 2010 07 23 06 54 55 31.3200 -97.3300 251.000 122.0 96.582 2.480 -999.990 -999.990 0.966 ..P WKT 2010 07 23 06 59 55 31.3200 -97.3300 251.000 457.0 83.193 2.400 -999.990 -999.990 0.832 ..P WKT 2010 07 23 07 04 55 31.3200 -97.3300 251.000 30.0 87.137 2.450 -999.990 -999.990 0.871 ..P WKT 2010 07 23 07 09 55 31.3200 -97.3300 251.000 122.0 90.671 5.320 -999.990 -999.990 0.907 ..P WKT 2010 07 23 07 14 55 31.3200 -97.3300 251.000 457.0 88.064 2.990 -999.990 -999.990 0.881 ..P WKT 2010 07 23 07 24 55 31.3200 -97.3300 251.000 30.0 94.937 3.070 -999.990 -999.990 0.949 ..P WKT 2010 07 23 07 29 55 31.3200 -97.3300 251.000 122.0 92.818 3.040 -999.990 -999.990 0.928 ..P WKT 2010 07 23 07 34 55 31.3200 -97.3300 251.000 457.0 80.328 3.030 -999.990 -999.990 0.803 ..P WKT 2010 07 23 07 39 55 31.3200 -97.3300 251.000 30.0 91.445 2.380 -999.990 -999.990 0.914 ..P WKT 2010 07 23 07 44 55 31.3200 -97.3300 251.000 122.0 92.737 3.540 -999.990 -999.990 0.927 ..P WKT 2010 07 23 07 49 55 31.3200 -97.3300 251.000 457.0 78.202 2.440 -999.990 -999.990 0.782 ..P WKT 2010 07 23 07 59 55 31.3200 -97.3300 251.000 30.0 95.209 3.510 -999.990 -999.990 0.952 ..P WKT 2010 07 23 08 04 55 31.3200 -97.3300 251.000 122.0 95.234 1.900 -999.990 -999.990 0.952 ..P WKT 2010 07 23 08 09 55 31.3200 -97.3300 251.000 457.0 75.068 2.030 -999.990 -999.990 0.751 ..P WKT 2010 07 23 08 14 55 31.3200 -97.3300 251.000 30.0 92.419 2.350 -999.990 -999.990 0.924 ..P WKT 2010 07 23 08 19 55 31.3200 -97.3300 251.000 122.0 95.036 2.440 -999.990 -999.990 0.950 ..P WKT 2010 07 23 08 24 55 31.3200 -97.3300 251.000 457.0 78.009 3.570 -999.990 -999.990 0.780 ..P WKT 2010 07 23 08 34 55 31.3200 -97.3300 251.000 30.0 90.707 2.640 -999.990 -999.990 0.907 ..P WKT 2010 07 23 08 39 55 31.3200 -97.3300 251.000 122.0 95.876 2.940 -999.990 -999.990 0.959 ..P WKT 2010 07 23 08 44 55 31.3200 -97.3300 251.000 457.0 78.129 2.230 -999.990 -999.990 0.781 ..P WKT 2010 07 23 08 49 55 31.3200 -97.3300 251.000 30.0 89.300 2.300 -999.990 -999.990 0.893 ..P WKT 2010 07 23 08 54 55 31.3200 -97.3300 251.000 122.0 89.014 2.190 -999.990 -999.990 0.890 ..P WKT 2010 07 23 08 59 55 31.3200 -97.3300 251.000 457.0 72.087 1.980 -999.990 -999.990 0.721 ..P WKT 2010 07 23 09 09 55 31.3200 -97.3300 251.000 30.0 86.926 3.280 -999.990 -999.990 0.869 ..P WKT 2010 07 23 09 14 55 31.3200 -97.3300 251.000 122.0 93.050 4.030 -999.990 -999.990 0.930 ..P WKT 2010 07 23 09 19 55 31.3200 -97.3300 251.000 457.0 75.988 2.520 -999.990 -999.990 0.760 ..P WKT 2010 07 23 09 24 55 31.3200 -97.3300 251.000 30.0 91.385 2.120 -999.990 -999.990 0.914 ..P WKT 2010 07 23 09 29 55 31.3200 -97.3300 251.000 122.0 92.326 2.620 -999.990 -999.990 0.923 ..P WKT 2010 07 23 09 34 55 31.3200 -97.3300 251.000 457.0 77.992 2.600 -999.990 -999.990 0.780 ..P WKT 2010 07 23 09 44 55 31.3200 -97.3300 251.000 30.0 91.329 2.830 -999.990 -999.990 0.913 ..P WKT 2010 07 23 09 49 55 31.3200 -97.3300 251.000 122.0 95.269 2.120 -999.990 -999.990 0.953 ..P WKT 2010 07 23 09 54 55 31.3200 -97.3300 251.000 457.0 79.302 2.150 -999.990 -999.990 0.793 ..P WKT 2010 07 23 09 59 55 31.3200 -97.3300 251.000 30.0 93.605 2.170 -999.990 -999.990 0.936 ..P WKT 2010 07 23 10 04 55 31.3200 -97.3300 251.000 122.0 99.726 2.120 -999.990 -999.990 0.997 ..P WKT 2010 07 23 10 09 55 31.3200 -97.3300 251.000 457.0 77.760 3.220 -999.990 -999.990 0.778 ..P WKT 2010 07 23 10 19 55 31.3200 -97.3300 251.000 30.0 92.964 3.480 -999.990 -999.990 0.930 ..P WKT 2010 07 23 10 24 55 31.3200 -97.3300 251.000 122.0 97.410 2.730 -999.990 -999.990 0.974 ..P WKT 2010 07 23 10 29 55 31.3200 -97.3300 251.000 457.0 70.363 3.270 -999.990 -999.990 0.704 ..P WKT 2010 07 23 10 34 55 31.3200 -97.3300 251.000 30.0 92.124 2.830 -999.990 -999.990 0.921 ..P WKT 2010 07 23 10 39 55 31.3200 -97.3300 251.000 122.0 94.662 2.740 -999.990 -999.990 0.947 ..P WKT 2010 07 23 10 44 55 31.3200 -97.3300 251.000 457.0 80.021 3.080 -999.990 -999.990 0.800 ..P WKT 2010 07 23 10 54 55 31.3200 -97.3300 251.000 30.0 92.419 2.590 -999.990 -999.990 0.924 ..P WKT 2010 07 23 10 59 55 31.3200 -97.3300 251.000 122.0 87.419 2.390 -999.990 -999.990 0.874 ..P WKT 2010 07 23 11 04 55 31.3200 -97.3300 251.000 457.0 72.197 2.360 -999.990 -999.990 0.722 ..P WKT 2010 07 23 11 09 55 31.3200 -97.3300 251.000 30.0 89.826 3.340 -999.990 -999.990 0.898 ..P WKT 2010 07 23 11 14 55 31.3200 -97.3300 251.000 122.0 84.282 2.400 -999.990 -999.990 0.843 ..P WKT 2010 07 23 11 19 55 31.3200 -97.3300 251.000 457.0 70.969 3.290 -999.990 -999.990 0.710 ..P WKT 2010 07 23 11 29 55 31.3200 -97.3300 251.000 30.0 92.521 2.470 -999.990 -999.990 0.925 ..P WKT 2010 07 23 11 34 55 31.3200 -97.3300 251.000 122.0 96.308 2.490 -999.990 -999.990 0.963 ..P WKT 2010 07 23 11 39 55 31.3200 -97.3300 251.000 457.0 81.015 2.180 -999.990 -999.990 0.810 ..P WKT 2010 07 23 11 44 55 31.3200 -97.3300 251.000 30.0 105.382 3.430 -999.990 -999.990 1.054 ..P WKT 2010 07 23 11 49 55 31.3200 -97.3300 251.000 122.0 92.542 3.120 -999.990 -999.990 0.925 ..P WKT 2010 07 23 12 09 55 31.3200 -97.3300 251.000 457.0 76.151 2.460 -999.990 -999.990 0.762 ..P WKT 2010 07 23 12 10 25 31.3200 -97.3300 251.000 457.0 76.950 2.380 -999.990 -999.990 0.770 ..P WKT 2010 07 23 12 10 55 31.3200 -97.3300 251.000 457.0 73.522 3.190 -999.990 -999.990 0.735 ..P WKT 2010 07 23 12 11 25 31.3200 -97.3300 251.000 457.0 74.458 3.500 -999.990 -999.990 0.745 ..P WKT 2010 07 23 12 11 55 31.3200 -97.3300 251.000 457.0 82.210 2.820 -999.990 -999.990 0.822 ..P WKT 2010 07 23 12 12 25 31.3200 -97.3300 251.000 457.0 77.009 2.040 -999.990 -999.990 0.770 ..P WKT 2010 07 23 12 12 55 31.3200 -97.3300 251.000 457.0 73.718 2.580 -999.990 -999.990 0.737 ..P WKT 2010 07 23 12 13 25 31.3200 -97.3300 251.000 457.0 75.608 2.130 -999.990 -999.990 0.756 ..P WKT 2010 07 23 12 13 55 31.3200 -97.3300 251.000 457.0 78.179 2.550 -999.990 -999.990 0.782 ..P WKT 2010 07 23 12 14 25 31.3200 -97.3300 251.000 457.0 76.252 2.670 -999.990 -999.990 0.763 ..P WKT 2010 07 23 12 14 55 31.3200 -97.3300 251.000 457.0 74.596 2.370 -999.990 -999.990 0.746 ..P WKT 2010 07 23 12 19 55 31.3200 -97.3300 251.000 30.0 106.588 2.370 -999.990 -999.990 1.066 ..P WKT 2010 07 23 12 24 55 31.3200 -97.3300 251.000 122.0 102.310 4.590 -999.990 -999.990 1.023 ..P WKT 2010 07 23 12 29 55 31.3200 -97.3300 251.000 457.0 85.209 3.510 -999.990 -999.990 0.852 ..P WKT 2010 07 23 12 34 55 31.3200 -97.3300 251.000 30.0 108.486 3.560 -999.990 -999.990 1.085 ..P WKT 2010 07 23 12 39 55 31.3200 -97.3300 251.000 122.0 109.937 3.690 -999.990 -999.990 1.099 ..P WKT 2010 07 23 12 44 55 31.3200 -97.3300 251.000 457.0 81.637 4.650 -999.990 -999.990 0.816 ..P WKT 2010 07 23 12 54 55 31.3200 -97.3300 251.000 30.0 105.935 4.380 -999.990 -999.990 1.059 ..P WKT 2010 07 23 12 59 55 31.3200 -97.3300 251.000 122.0 101.210 3.720 -999.990 -999.990 1.012 ..P WKT 2010 07 23 13 04 55 31.3200 -97.3300 251.000 457.0 76.818 3.500 -999.990 -999.990 0.768 ..P WKT 2010 07 23 13 09 55 31.3200 -97.3300 251.000 30.0 95.307 5.290 -999.990 -999.990 0.953 ..P WKT 2010 07 23 13 14 55 31.3200 -97.3300 251.000 122.0 97.409 3.920 -999.990 -999.990 0.974 ..P WKT 2010 07 23 13 19 55 31.3200 -97.3300 251.000 457.0 83.661 3.040 -999.990 -999.990 0.837 ..P WKT 2010 07 23 13 29 55 31.3200 -97.3300 251.000 30.0 91.066 3.150 -999.990 -999.990 0.911 ..P WKT 2010 07 23 13 34 55 31.3200 -97.3300 251.000 122.0 97.738 4.110 -999.990 -999.990 0.977 ..P WKT 2010 07 23 13 39 55 31.3200 -97.3300 251.000 457.0 75.974 4.610 -999.990 -999.990 0.760 ..P WKT 2010 07 23 13 44 55 31.3200 -97.3300 251.000 30.0 89.757 5.100 -999.990 -999.990 0.898 ..P WKT 2010 07 23 13 49 55 31.3200 -97.3300 251.000 122.0 93.697 4.340 -999.990 -999.990 0.937 ..P WKT 2010 07 23 13 54 55 31.3200 -97.3300 251.000 457.0 80.949 3.770 -999.990 -999.990 0.809 ..P WKT 2010 07 23 14 04 55 31.3200 -97.3300 251.000 30.0 98.995 3.900 -999.990 -999.990 0.990 ..P WKT 2010 07 23 14 09 55 31.3200 -97.3300 251.000 122.0 94.493 4.500 -999.990 -999.990 0.945 ..P WKT 2010 07 23 14 14 55 31.3200 -97.3300 251.000 457.0 79.313 5.840 -999.990 -999.990 0.793 ..P WKT 2010 07 23 14 19 55 31.3200 -97.3300 251.000 30.0 85.211 4.530 -999.990 -999.990 0.852 ..P WKT 2010 07 23 14 24 55 31.3200 -97.3300 251.000 122.0 97.957 3.210 -999.990 -999.990 0.980 ..P WKT 2010 07 23 14 29 55 31.3200 -97.3300 251.000 457.0 76.470 5.270 -999.990 -999.990 0.765 ..P WKT 2010 07 23 14 39 55 31.3200 -97.3300 251.000 30.0 87.177 2.300 -999.990 -999.990 0.872 ..P WKT 2010 07 23 14 44 55 31.3200 -97.3300 251.000 122.0 87.600 4.140 -999.990 -999.990 0.876 ..P WKT 2010 07 23 14 49 55 31.3200 -97.3300 251.000 457.0 75.279 2.750 -999.990 -999.990 0.753 ..P WKT 2010 07 23 14 54 55 31.3200 -97.3300 251.000 30.0 87.625 3.170 -999.990 -999.990 0.876 ..P WKT 2010 07 23 14 59 55 31.3200 -97.3300 251.000 122.0 87.363 4.130 -999.990 -999.990 0.874 ..P WKT 2010 07 23 15 04 55 31.3200 -97.3300 251.000 457.0 80.246 3.910 -999.990 -999.990 0.802 ..P WKT 2010 07 23 15 14 55 31.3200 -97.3300 251.000 30.0 82.992 2.770 -999.990 -999.990 0.830 ..P WKT 2010 07 23 15 19 55 31.3200 -97.3300 251.000 122.0 92.448 5.000 -999.990 -999.990 0.924 ..P WKT 2010 07 23 15 24 55 31.3200 -97.3300 251.000 457.0 83.799 3.290 -999.990 -999.990 0.838 ..P WKT 2010 07 23 15 29 55 31.3200 -97.3300 251.000 30.0 82.556 3.800 -999.990 -999.990 0.826 ..P WKT 2010 07 23 15 34 55 31.3200 -97.3300 251.000 122.0 90.096 3.700 -999.990 -999.990 0.901 ..P WKT 2010 07 23 15 39 55 31.3200 -97.3300 251.000 457.0 81.717 3.760 -999.990 -999.990 0.817 ..P WKT 2010 07 23 15 49 55 31.3200 -97.3300 251.000 30.0 83.211 3.960 -999.990 -999.990 0.832 ..P WKT 2010 07 23 15 54 55 31.3200 -97.3300 251.000 122.0 87.048 3.890 -999.990 -999.990 0.870 ..P WKT 2010 07 23 15 59 55 31.3200 -97.3300 251.000 457.0 84.706 4.380 -999.990 -999.990 0.847 ..P WKT 2010 07 23 16 04 55 31.3200 -97.3300 251.000 30.0 83.050 5.090 -999.990 -999.990 0.831 ..P WKT 2010 07 23 16 09 55 31.3200 -97.3300 251.000 122.0 89.087 4.720 -999.990 -999.990 0.891 ..P WKT 2010 07 23 16 14 55 31.3200 -97.3300 251.000 457.0 80.561 3.580 -999.990 -999.990 0.806 ..P WKT 2010 07 23 16 24 55 31.3200 -97.3300 251.000 30.0 83.823 3.180 -999.990 -999.990 0.838 ..P WKT 2010 07 23 16 29 55 31.3200 -97.3300 251.000 122.0 84.484 3.140 -999.990 -999.990 0.845 ..P WKT 2010 07 23 16 34 55 31.3200 -97.3300 251.000 457.0 84.181 3.630 -999.990 -999.990 0.842 ..P WKT 2010 07 23 16 39 55 31.3200 -97.3300 251.000 30.0 87.180 3.920 -999.990 -999.990 0.872 ..P WKT 2010 07 23 16 44 55 31.3200 -97.3300 251.000 122.0 89.903 4.840 -999.990 -999.990 0.899 ..P WKT 2010 07 23 16 49 55 31.3200 -97.3300 251.000 457.0 77.496 3.550 -999.990 -999.990 0.775 ..P WKT 2010 07 23 17 04 55 31.3200 -97.3300 251.000 30.0 85.983 3.470 -999.990 -999.990 0.860 ..P WKT 2010 07 23 17 09 55 31.3200 -97.3300 251.000 122.0 92.583 3.950 -999.990 -999.990 0.926 ..P WKT 2010 07 23 17 14 55 31.3200 -97.3300 251.000 457.0 81.287 4.100 -999.990 -999.990 0.813 ..P WKT 2010 07 23 17 19 55 31.3200 -97.3300 251.000 30.0 90.643 4.000 -999.990 -999.990 0.906 ..P WKT 2010 07 23 17 24 55 31.3200 -97.3300 251.000 122.0 94.216 3.520 -999.990 -999.990 0.942 ..P WKT 2010 07 23 17 29 55 31.3200 -97.3300 251.000 457.0 85.946 3.070 -999.990 -999.990 0.859 ..P WKT 2010 07 23 17 39 55 31.3200 -97.3300 251.000 30.0 86.168 3.460 -999.990 -999.990 0.862 ..P WKT 2010 07 23 17 44 55 31.3200 -97.3300 251.000 122.0 88.876 3.720 -999.990 -999.990 0.889 ..P WKT 2010 07 23 17 49 55 31.3200 -97.3300 251.000 457.0 84.971 4.150 -999.990 -999.990 0.850 ..P WKT 2010 07 23 17 54 55 31.3200 -97.3300 251.000 30.0 82.994 4.280 -999.990 -999.990 0.830 ..P WKT 2010 07 23 17 59 55 31.3200 -97.3300 251.000 122.0 90.668 4.890 -999.990 -999.990 0.907 ..P WKT 2010 07 23 18 04 55 31.3200 -97.3300 251.000 457.0 84.003 3.920 -999.990 -999.990 0.840 ..P WKT 2010 07 23 18 14 55 31.3200 -97.3300 251.000 30.0 88.500 4.160 -999.990 -999.990 0.885 ..P WKT 2010 07 23 18 19 55 31.3200 -97.3300 251.000 122.0 94.426 5.300 -999.990 -999.990 0.944 ..P WKT 2010 07 23 18 24 55 31.3200 -97.3300 251.000 457.0 79.517 4.050 -999.990 -999.990 0.795 ..P WKT 2010 07 23 18 29 55 31.3200 -97.3300 251.000 30.0 84.477 4.530 -999.990 -999.990 0.845 ..P WKT 2010 07 23 18 34 55 31.3200 -97.3300 251.000 122.0 87.644 3.920 -999.990 -999.990 0.876 ..P WKT 2010 07 23 18 39 55 31.3200 -97.3300 251.000 457.0 85.566 4.570 -999.990 -999.990 0.856 ..P WKT 2010 07 23 18 49 55 31.3200 -97.3300 251.000 30.0 84.466 3.910 -999.990 -999.990 0.845 ..P WKT 2010 07 23 18 54 55 31.3200 -97.3300 251.000 122.0 80.197 4.350 -999.990 -999.990 0.802 ..P WKT 2010 07 23 18 59 55 31.3200 -97.3300 251.000 457.0 76.478 3.500 -999.990 -999.990 0.765 ..P WKT 2010 07 23 19 04 55 31.3200 -97.3300 251.000 30.0 81.464 3.790 -999.990 -999.990 0.815 ..P WKT 2010 07 23 19 09 55 31.3200 -97.3300 251.000 122.0 84.930 4.210 -999.990 -999.990 0.849 ..P WKT 2010 07 23 19 14 55 31.3200 -97.3300 251.000 457.0 83.974 3.760 -999.990 -999.990 0.840 ..P WKT 2010 07 23 19 24 55 31.3200 -97.3300 251.000 30.0 88.660 3.750 -999.990 -999.990 0.887 ..P WKT 2010 07 23 19 29 55 31.3200 -97.3300 251.000 122.0 89.739 4.210 -999.990 -999.990 0.897 ..P WKT 2010 07 23 19 34 55 31.3200 -97.3300 251.000 457.0 85.426 4.140 -999.990 -999.990 0.854 ..P WKT 2010 07 23 19 39 55 31.3200 -97.3300 251.000 30.0 85.122 3.540 -999.990 -999.990 0.851 ..P WKT 2010 07 23 19 44 55 31.3200 -97.3300 251.000 122.0 94.225 3.770 -999.990 -999.990 0.942 ..P WKT 2010 07 23 19 49 55 31.3200 -97.3300 251.000 457.0 82.854 4.360 -999.990 -999.990 0.829 ..P WKT 2010 07 23 19 59 55 31.3200 -97.3300 251.000 30.0 88.256 5.310 -999.990 -999.990 0.883 ..P WKT 2010 07 23 20 04 55 31.3200 -97.3300 251.000 122.0 91.472 4.240 -999.990 -999.990 0.915 ..P WKT 2010 07 23 20 09 55 31.3200 -97.3300 251.000 457.0 86.106 5.150 -999.990 -999.990 0.861 ..P WKT 2010 07 23 20 14 55 31.3200 -97.3300 251.000 30.0 94.446 5.240 -999.990 -999.990 0.944 ..P WKT 2010 07 23 20 19 55 31.3200 -97.3300 251.000 122.0 89.909 4.480 -999.990 -999.990 0.899 ..P WKT 2010 07 23 20 24 55 31.3200 -97.3300 251.000 457.0 83.709 5.080 -999.990 -999.990 0.837 ..P WKT 2010 07 23 20 34 55 31.3200 -97.3300 251.000 30.0 88.365 5.040 -999.990 -999.990 0.884 ..P WKT 2010 07 23 20 39 55 31.3200 -97.3300 251.000 122.0 87.171 4.850 -999.990 -999.990 0.872 ..P WKT 2010 07 23 20 44 55 31.3200 -97.3300 251.000 457.0 83.203 5.240 -999.990 -999.990 0.832 ..P WKT 2010 07 23 20 49 55 31.3200 -97.3300 251.000 30.0 85.334 5.920 -999.990 -999.990 0.853 ..P WKT 2010 07 23 20 54 55 31.3200 -97.3300 251.000 122.0 89.961 5.390 -999.990 -999.990 0.900 ..P WKT 2010 07 23 20 59 55 31.3200 -97.3300 251.000 457.0 82.942 4.580 -999.990 -999.990 0.829 ..P WKT 2010 07 23 21 09 55 31.3200 -97.3300 251.000 30.0 84.947 4.290 -999.990 -999.990 0.849 ..P WKT 2010 07 23 21 14 55 31.3200 -97.3300 251.000 122.0 89.538 5.690 -999.990 -999.990 0.895 ..P WKT 2010 07 23 21 19 55 31.3200 -97.3300 251.000 457.0 81.087 5.890 -999.990 -999.990 0.811 ..P WKT 2010 07 23 21 24 55 31.3200 -97.3300 251.000 30.0 85.679 5.860 -999.990 -999.990 0.857 ..P WKT 2010 07 23 21 29 55 31.3200 -97.3300 251.000 122.0 94.436 5.000 -999.990 -999.990 0.944 ..P WKT 2010 07 23 21 34 55 31.3200 -97.3300 251.000 457.0 91.812 4.460 -999.990 -999.990 0.918 ..P WKT 2010 07 23 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 07 23 21 49 55 31.3200 -97.3300 251.000 122.0 103.977 5.080 -999.990 -999.990 1.040 ..P WKT 2010 07 23 21 54 55 31.3200 -97.3300 251.000 457.0 92.342 5.610 -999.990 -999.990 0.923 ..P WKT 2010 07 23 21 59 55 31.3200 -97.3300 251.000 30.0 98.211 4.780 -999.990 -999.990 0.982 ..P WKT 2010 07 23 22 04 55 31.3200 -97.3300 251.000 122.0 105.194 4.310 -999.990 -999.990 1.052 ..P WKT 2010 07 23 22 09 55 31.3200 -97.3300 251.000 457.0 85.494 4.500 -999.990 -999.990 0.855 ..P WKT 2010 07 23 22 19 55 31.3200 -97.3300 251.000 30.0 90.265 4.590 -999.990 -999.990 0.903 ..P WKT 2010 07 23 22 24 55 31.3200 -97.3300 251.000 122.0 86.803 4.270 -999.990 -999.990 0.868 ..P WKT 2010 07 23 22 29 55 31.3200 -97.3300 251.000 457.0 80.139 4.280 -999.990 -999.990 0.801 ..P WKT 2010 07 23 22 34 55 31.3200 -97.3300 251.000 30.0 84.602 4.480 -999.990 -999.990 0.846 ..P WKT 2010 07 23 22 39 55 31.3200 -97.3300 251.000 122.0 95.188 4.540 -999.990 -999.990 0.952 ..P WKT 2010 07 23 22 44 55 31.3200 -97.3300 251.000 457.0 82.818 4.410 -999.990 -999.990 0.828 ..P WKT 2010 07 23 22 54 55 31.3200 -97.3300 251.000 30.0 85.089 4.430 -999.990 -999.990 0.851 ..P WKT 2010 07 23 22 59 55 31.3200 -97.3300 251.000 122.0 90.968 4.550 -999.990 -999.990 0.910 ..P WKT 2010 07 23 23 04 55 31.3200 -97.3300 251.000 457.0 90.027 4.170 -999.990 -999.990 0.900 ..P WKT 2010 07 23 23 09 55 31.3200 -97.3300 251.000 30.0 93.541 4.600 -999.990 -999.990 0.935 ..P WKT 2010 07 23 23 14 55 31.3200 -97.3300 251.000 122.0 98.450 5.290 -999.990 -999.990 0.985 ..P WKT 2010 07 23 23 19 55 31.3200 -97.3300 251.000 457.0 89.013 4.120 -999.990 -999.990 0.890 ..P WKT 2010 07 23 23 29 55 31.3200 -97.3300 251.000 30.0 85.607 4.940 -999.990 -999.990 0.856 ..P WKT 2010 07 23 23 34 55 31.3200 -97.3300 251.000 122.0 96.940 5.330 -999.990 -999.990 0.969 ..P WKT 2010 07 23 23 39 55 31.3200 -97.3300 251.000 457.0 90.854 4.570 -999.990 -999.990 0.909 ..P WKT 2010 07 23 23 44 55 31.3200 -97.3300 251.000 30.0 80.445 4.700 -999.990 -999.990 0.804 ..P WKT 2010 07 23 23 49 55 31.3200 -97.3300 251.000 122.0 91.225 4.860 -999.990 -999.990 0.912 ..P WKT 2010 07 24 00 09 55 31.3200 -97.3300 251.000 457.0 87.659 4.520 -999.990 -999.990 0.877 ..P WKT 2010 07 24 00 10 25 31.3200 -97.3300 251.000 457.0 87.227 4.540 -999.990 -999.990 0.872 ..P WKT 2010 07 24 00 10 55 31.3200 -97.3300 251.000 457.0 84.563 4.670 -999.990 -999.990 0.846 ..P WKT 2010 07 24 00 11 25 31.3200 -97.3300 251.000 457.0 83.574 4.540 -999.990 -999.990 0.836 ..P WKT 2010 07 24 00 11 55 31.3200 -97.3300 251.000 457.0 84.258 4.760 -999.990 -999.990 0.843 ..P WKT 2010 07 24 00 12 25 31.3200 -97.3300 251.000 457.0 87.174 4.820 -999.990 -999.990 0.872 ..P WKT 2010 07 24 00 12 55 31.3200 -97.3300 251.000 457.0 89.950 5.740 -999.990 -999.990 0.900 ..P WKT 2010 07 24 00 13 25 31.3200 -97.3300 251.000 457.0 83.381 4.640 -999.990 -999.990 0.834 ..P WKT 2010 07 24 00 13 55 31.3200 -97.3300 251.000 457.0 79.741 4.990 -999.990 -999.990 0.797 ..P WKT 2010 07 24 00 14 25 31.3200 -97.3300 251.000 457.0 83.772 4.560 -999.990 -999.990 0.838 ..P WKT 2010 07 24 00 14 55 31.3200 -97.3300 251.000 457.0 81.108 4.430 -999.990 -999.990 0.811 ..P WKT 2010 07 24 00 19 55 31.3200 -97.3300 251.000 30.0 87.949 4.930 -999.990 -999.990 0.879 ..P WKT 2010 07 24 00 24 55 31.3200 -97.3300 251.000 122.0 84.605 4.500 -999.990 -999.990 0.846 ..P WKT 2010 07 24 00 29 55 31.3200 -97.3300 251.000 457.0 79.728 4.540 -999.990 -999.990 0.797 ..P WKT 2010 07 24 00 34 55 31.3200 -97.3300 251.000 30.0 81.267 4.800 -999.990 -999.990 0.813 ..P WKT 2010 07 24 00 39 55 31.3200 -97.3300 251.000 122.0 87.830 4.190 -999.990 -999.990 0.878 ..P WKT 2010 07 24 00 44 55 31.3200 -97.3300 251.000 457.0 87.974 4.710 -999.990 -999.990 0.880 ..P WKT 2010 07 24 00 54 55 31.3200 -97.3300 251.000 30.0 86.385 4.460 -999.990 -999.990 0.864 ..P WKT 2010 07 24 00 59 55 31.3200 -97.3300 251.000 122.0 86.047 4.490 -999.990 -999.990 0.860 ..P WKT 2010 07 24 01 04 55 31.3200 -97.3300 251.000 457.0 84.871 4.250 -999.990 -999.990 0.849 ..P WKT 2010 07 24 01 09 55 31.3200 -97.3300 251.000 30.0 83.137 4.580 -999.990 -999.990 0.831 ..P WKT 2010 07 24 01 14 55 31.3200 -97.3300 251.000 122.0 86.427 4.150 -999.990 -999.990 0.864 ..P WKT 2010 07 24 01 19 55 31.3200 -97.3300 251.000 457.0 86.368 3.900 -999.990 -999.990 0.864 ..P WKT 2010 07 24 01 29 55 31.3200 -97.3300 251.000 30.0 85.492 4.870 -999.990 -999.990 0.855 ..P WKT 2010 07 24 01 34 55 31.3200 -97.3300 251.000 122.0 89.422 4.330 -999.990 -999.990 0.894 ..P WKT 2010 07 24 01 39 55 31.3200 -97.3300 251.000 457.0 80.786 3.860 -999.990 -999.990 0.808 ..P WKT 2010 07 24 01 44 55 31.3200 -97.3300 251.000 30.0 81.365 4.080 -999.990 -999.990 0.814 ..P WKT 2010 07 24 01 49 55 31.3200 -97.3300 251.000 122.0 92.276 4.270 -999.990 -999.990 0.923 ..P WKT 2010 07 24 01 54 55 31.3200 -97.3300 251.000 457.0 89.504 4.400 -999.990 -999.990 0.895 ..P WKT 2010 07 24 02 04 55 31.3200 -97.3300 251.000 30.0 85.197 3.930 -999.990 -999.990 0.852 ..P WKT 2010 07 24 02 09 55 31.3200 -97.3300 251.000 122.0 87.571 3.960 -999.990 -999.990 0.876 ..P WKT 2010 07 24 02 14 55 31.3200 -97.3300 251.000 457.0 83.382 4.100 -999.990 -999.990 0.834 ..P WKT 2010 07 24 02 19 55 31.3200 -97.3300 251.000 30.0 89.667 3.970 -999.990 -999.990 0.897 ..P WKT 2010 07 24 02 24 55 31.3200 -97.3300 251.000 122.0 91.624 4.590 -999.990 -999.990 0.916 ..P WKT 2010 07 24 02 29 55 31.3200 -97.3300 251.000 457.0 79.892 4.420 -999.990 -999.990 0.799 ..P WKT 2010 07 24 02 39 55 31.3200 -97.3300 251.000 30.0 89.710 3.960 -999.990 -999.990 0.897 ..P WKT 2010 07 24 02 44 55 31.3200 -97.3300 251.000 122.0 86.398 3.880 -999.990 -999.990 0.864 ..P WKT 2010 07 24 02 49 55 31.3200 -97.3300 251.000 457.0 89.372 4.670 -999.990 -999.990 0.894 ..P WKT 2010 07 24 02 54 55 31.3200 -97.3300 251.000 30.0 82.148 4.230 -999.990 -999.990 0.821 ..P WKT 2010 07 24 02 59 55 31.3200 -97.3300 251.000 122.0 88.755 4.380 -999.990 -999.990 0.888 ..P WKT 2010 07 24 03 04 55 31.3200 -97.3300 251.000 457.0 90.333 4.690 -999.990 -999.990 0.903 ..P WKT 2010 07 24 03 14 55 31.3200 -97.3300 251.000 30.0 83.228 4.360 -999.990 -999.990 0.832 ..P WKT 2010 07 24 03 19 55 31.3200 -97.3300 251.000 122.0 98.999 4.540 -999.990 -999.990 0.990 ..P WKT 2010 07 24 03 24 55 31.3200 -97.3300 251.000 457.0 75.364 4.490 -999.990 -999.990 0.754 ..P WKT 2010 07 24 03 29 55 31.3200 -97.3300 251.000 30.0 94.769 4.880 -999.990 -999.990 0.948 ..P WKT 2010 07 24 03 34 55 31.3200 -97.3300 251.000 122.0 96.847 4.220 -999.990 -999.990 0.968 ..P WKT 2010 07 24 03 39 55 31.3200 -97.3300 251.000 457.0 79.776 4.270 -999.990 -999.990 0.798 ..P WKT 2010 07 24 03 49 55 31.3200 -97.3300 251.000 30.0 92.417 4.320 -999.990 -999.990 0.924 ..P WKT 2010 07 24 03 54 55 31.3200 -97.3300 251.000 122.0 94.176 4.860 -999.990 -999.990 0.942 ..P WKT 2010 07 24 03 59 55 31.3200 -97.3300 251.000 457.0 79.578 3.920 -999.990 -999.990 0.796 ..P WKT 2010 07 24 04 04 55 31.3200 -97.3300 251.000 30.0 89.723 4.330 -999.990 -999.990 0.897 ..P WKT 2010 07 24 04 09 55 31.3200 -97.3300 251.000 122.0 88.966 4.570 -999.990 -999.990 0.890 ..P WKT 2010 07 24 04 14 55 31.3200 -97.3300 251.000 457.0 79.678 4.010 -999.990 -999.990 0.797 ..P WKT 2010 07 24 04 24 55 31.3200 -97.3300 251.000 30.0 89.727 4.210 -999.990 -999.990 0.897 ..P WKT 2010 07 24 04 29 55 31.3200 -97.3300 251.000 122.0 86.272 4.200 -999.990 -999.990 0.863 ..P WKT 2010 07 24 04 34 55 31.3200 -97.3300 251.000 457.0 74.426 4.210 -999.990 -999.990 0.744 ..P WKT 2010 07 24 04 39 55 31.3200 -97.3300 251.000 30.0 86.632 5.870 -999.990 -999.990 0.866 ..P WKT 2010 07 24 04 44 55 31.3200 -97.3300 251.000 122.0 88.211 3.910 -999.990 -999.990 0.882 ..P WKT 2010 07 24 04 49 55 31.3200 -97.3300 251.000 457.0 70.490 3.670 -999.990 -999.990 0.705 ..P WKT 2010 07 24 05 04 55 31.3200 -97.3300 251.000 30.0 74.486 3.710 -999.990 -999.990 0.745 ..P WKT 2010 07 24 05 09 55 31.3200 -97.3300 251.000 122.0 81.151 4.580 -999.990 -999.990 0.812 ..P WKT 2010 07 24 05 14 55 31.3200 -97.3300 251.000 457.0 68.511 4.100 -999.990 -999.990 0.685 ..P WKT 2010 07 24 05 19 55 31.3200 -97.3300 251.000 30.0 81.332 5.920 -999.990 -999.990 0.813 ..P WKT 2010 07 24 05 24 55 31.3200 -97.3300 251.000 122.0 83.801 3.510 -999.990 -999.990 0.838 ..P WKT 2010 07 24 05 29 55 31.3200 -97.3300 251.000 457.0 74.237 4.610 -999.990 -999.990 0.742 ..P WKT 2010 07 24 05 39 55 31.3200 -97.3300 251.000 30.0 79.525 3.430 -999.990 -999.990 0.795 ..P WKT 2010 07 24 05 44 55 31.3200 -97.3300 251.000 122.0 76.466 3.630 -999.990 -999.990 0.765 ..P WKT 2010 07 24 05 49 55 31.3200 -97.3300 251.000 457.0 79.006 3.310 -999.990 -999.990 0.790 ..P WKT 2010 07 24 05 54 55 31.3200 -97.3300 251.000 30.0 79.026 3.440 -999.990 -999.990 0.790 ..P WKT 2010 07 24 05 59 55 31.3200 -97.3300 251.000 122.0 86.045 5.570 -999.990 -999.990 0.860 ..P WKT 2010 07 24 06 04 55 31.3200 -97.3300 251.000 457.0 81.446 3.670 -999.990 -999.990 0.814 ..P WKT 2010 07 24 06 14 55 31.3200 -97.3300 251.000 30.0 81.107 3.860 -999.990 -999.990 0.811 ..P WKT 2010 07 24 06 19 55 31.3200 -97.3300 251.000 122.0 90.826 4.390 -999.990 -999.990 0.908 ..P WKT 2010 07 24 06 24 55 31.3200 -97.3300 251.000 457.0 77.588 4.510 -999.990 -999.990 0.776 ..P WKT 2010 07 24 06 29 55 31.3200 -97.3300 251.000 30.0 88.289 4.180 -999.990 -999.990 0.883 ..P WKT 2010 07 24 06 34 55 31.3200 -97.3300 251.000 122.0 84.989 4.100 -999.990 -999.990 0.850 ..P WKT 2010 07 24 06 39 55 31.3200 -97.3300 251.000 457.0 81.690 4.150 -999.990 -999.990 0.817 ..P WKT 2010 07 24 06 49 55 31.3200 -97.3300 251.000 30.0 82.490 4.240 -999.990 -999.990 0.825 ..P WKT 2010 07 24 06 54 55 31.3200 -97.3300 251.000 122.0 81.971 4.010 -999.990 -999.990 0.820 ..P WKT 2010 07 24 06 59 55 31.3200 -97.3300 251.000 457.0 80.191 4.890 -999.990 -999.990 0.802 ..P WKT 2010 07 24 07 04 55 31.3200 -97.3300 251.000 30.0 86.253 4.310 -999.990 -999.990 0.863 ..P WKT 2010 07 24 07 09 55 31.3200 -97.3300 251.000 122.0 91.056 4.070 -999.990 -999.990 0.911 ..P WKT 2010 07 24 07 14 55 31.3200 -97.3300 251.000 457.0 76.531 5.010 -999.990 -999.990 0.765 ..P WKT 2010 07 24 07 24 55 31.3200 -97.3300 251.000 30.0 78.592 3.670 -999.990 -999.990 0.786 ..P WKT 2010 07 24 07 29 55 31.3200 -97.3300 251.000 122.0 86.357 3.260 -999.990 -999.990 0.864 ..P WKT 2010 07 24 07 34 55 31.3200 -97.3300 251.000 457.0 67.086 3.180 -999.990 -999.990 0.671 ..P WKT 2010 07 24 07 39 55 31.3200 -97.3300 251.000 30.0 86.899 3.560 -999.990 -999.990 0.869 ..P WKT 2010 07 24 07 44 55 31.3200 -97.3300 251.000 122.0 85.138 7.300 -999.990 -999.990 0.851 ..P WKT 2010 07 24 07 49 55 31.3200 -97.3300 251.000 457.0 78.474 3.280 -999.990 -999.990 0.785 ..P WKT 2010 07 24 07 59 55 31.3200 -97.3300 251.000 30.0 86.622 3.550 -999.990 -999.990 0.866 ..P WKT 2010 07 24 08 04 55 31.3200 -97.3300 251.000 122.0 84.481 4.710 -999.990 -999.990 0.845 ..P WKT 2010 07 24 08 09 55 31.3200 -97.3300 251.000 457.0 77.295 4.840 -999.990 -999.990 0.773 ..P WKT 2010 07 24 08 14 55 31.3200 -97.3300 251.000 30.0 90.007 3.990 -999.990 -999.990 0.900 ..P WKT 2010 07 24 08 19 55 31.3200 -97.3300 251.000 122.0 87.866 3.160 -999.990 -999.990 0.879 ..P WKT 2010 07 24 08 24 55 31.3200 -97.3300 251.000 457.0 67.786 3.630 -999.990 -999.990 0.678 ..P WKT 2010 07 24 08 34 55 31.3200 -97.3300 251.000 30.0 78.798 3.180 -999.990 -999.990 0.788 ..P WKT 2010 07 24 08 39 55 31.3200 -97.3300 251.000 122.0 88.029 4.100 -999.990 -999.990 0.880 ..P WKT 2010 07 24 08 44 55 31.3200 -97.3300 251.000 457.0 75.115 4.010 -999.990 -999.990 0.751 ..P WKT 2010 07 24 08 49 55 31.3200 -97.3300 251.000 30.0 83.225 3.760 -999.990 -999.990 0.832 ..P WKT 2010 07 24 08 54 55 31.3200 -97.3300 251.000 122.0 76.196 3.510 -999.990 -999.990 0.762 ..P WKT 2010 07 24 08 59 55 31.3200 -97.3300 251.000 457.0 69.447 3.870 -999.990 -999.990 0.694 ..P WKT 2010 07 24 09 09 55 31.3200 -97.3300 251.000 30.0 86.152 3.880 -999.990 -999.990 0.862 ..P WKT 2010 07 24 09 14 55 31.3200 -97.3300 251.000 122.0 81.004 4.100 -999.990 -999.990 0.810 ..P WKT 2010 07 24 09 19 55 31.3200 -97.3300 251.000 457.0 76.418 3.650 -999.990 -999.990 0.764 ..P WKT 2010 07 24 09 24 55 31.3200 -97.3300 251.000 30.0 76.879 3.560 -999.990 -999.990 0.769 ..P WKT 2010 07 24 09 29 55 31.3200 -97.3300 251.000 122.0 79.864 3.210 -999.990 -999.990 0.799 ..P WKT 2010 07 24 09 34 55 31.3200 -97.3300 251.000 457.0 73.875 3.260 -999.990 -999.990 0.739 ..P WKT 2010 07 24 09 44 55 31.3200 -97.3300 251.000 30.0 82.971 3.420 -999.990 -999.990 0.830 ..P WKT 2010 07 24 09 49 55 31.3200 -97.3300 251.000 122.0 75.338 3.040 -999.990 -999.990 0.753 ..P WKT 2010 07 24 09 54 55 31.3200 -97.3300 251.000 457.0 71.070 3.180 -999.990 -999.990 0.711 ..P WKT 2010 07 24 09 59 55 31.3200 -97.3300 251.000 30.0 74.096 4.050 -999.990 -999.990 0.741 ..P WKT 2010 07 24 10 04 55 31.3200 -97.3300 251.000 122.0 75.438 4.390 -999.990 -999.990 0.754 ..P WKT 2010 07 24 10 09 55 31.3200 -97.3300 251.000 457.0 70.328 3.570 -999.990 -999.990 0.703 ..P WKT 2010 07 24 10 19 55 31.3200 -97.3300 251.000 30.0 75.239 3.740 -999.990 -999.990 0.752 ..P WKT 2010 07 24 10 24 55 31.3200 -97.3300 251.000 122.0 76.562 3.350 -999.990 -999.990 0.766 ..P WKT 2010 07 24 10 29 55 31.3200 -97.3300 251.000 457.0 67.643 3.700 -999.990 -999.990 0.676 ..P WKT 2010 07 24 10 34 55 31.3200 -97.3300 251.000 30.0 77.104 4.310 -999.990 -999.990 0.771 ..P WKT 2010 07 24 10 39 55 31.3200 -97.3300 251.000 122.0 86.567 3.620 -999.990 -999.990 0.866 ..P WKT 2010 07 24 10 44 55 31.3200 -97.3300 251.000 457.0 73.858 3.940 -999.990 -999.990 0.739 ..P WKT 2010 07 24 10 54 55 31.3200 -97.3300 251.000 30.0 73.738 3.840 -999.990 -999.990 0.737 ..P WKT 2010 07 24 10 59 55 31.3200 -97.3300 251.000 122.0 84.224 2.870 -999.990 -999.990 0.842 ..P WKT 2010 07 24 11 04 55 31.3200 -97.3300 251.000 457.0 76.746 3.350 -999.990 -999.990 0.767 ..P WKT 2010 07 24 11 09 55 31.3200 -97.3300 251.000 30.0 80.916 3.160 -999.990 -999.990 0.809 ..P WKT 2010 07 24 11 14 55 31.3200 -97.3300 251.000 122.0 83.404 4.560 -999.990 -999.990 0.834 ..P WKT 2010 07 24 11 19 55 31.3200 -97.3300 251.000 457.0 73.398 2.680 -999.990 -999.990 0.734 ..P WKT 2010 07 24 11 29 55 31.3200 -97.3300 251.000 30.0 85.241 4.200 -999.990 -999.990 0.852 ..P WKT 2010 07 24 11 34 55 31.3200 -97.3300 251.000 122.0 83.085 3.150 -999.990 -999.990 0.831 ..P WKT 2010 07 24 11 39 55 31.3200 -97.3300 251.000 457.0 74.893 3.430 -999.990 -999.990 0.749 ..P WKT 2010 07 24 11 44 55 31.3200 -97.3300 251.000 30.0 93.096 3.360 -999.990 -999.990 0.931 ..P WKT 2010 07 24 11 49 55 31.3200 -97.3300 251.000 122.0 76.057 4.140 -999.990 -999.990 0.761 ..P WKT 2010 07 24 12 09 55 31.3200 -97.3300 251.000 457.0 65.619 3.100 -999.990 -999.990 0.656 ..P WKT 2010 07 24 12 10 25 31.3200 -97.3300 251.000 457.0 69.858 2.700 -999.990 -999.990 0.699 ..P WKT 2010 07 24 12 10 55 31.3200 -97.3300 251.000 457.0 70.446 3.330 -999.990 -999.990 0.704 ..P WKT 2010 07 24 12 11 25 31.3200 -97.3300 251.000 457.0 69.910 2.790 -999.990 -999.990 0.699 ..P WKT 2010 07 24 12 11 55 31.3200 -97.3300 251.000 457.0 67.689 3.510 -999.990 -999.990 0.677 ..P WKT 2010 07 24 12 12 25 31.3200 -97.3300 251.000 457.0 68.839 2.950 -999.990 -999.990 0.688 ..P WKT 2010 07 24 12 12 55 31.3200 -97.3300 251.000 457.0 73.078 2.630 -999.990 -999.990 0.731 ..P WKT 2010 07 24 12 13 25 31.3200 -97.3300 251.000 457.0 71.138 2.680 -999.990 -999.990 0.711 ..P WKT 2010 07 24 12 13 55 31.3200 -97.3300 251.000 457.0 67.513 2.950 -999.990 -999.990 0.675 ..P WKT 2010 07 24 12 14 25 31.3200 -97.3300 251.000 457.0 72.313 3.120 -999.990 -999.990 0.723 ..P WKT 2010 07 24 12 14 55 31.3200 -97.3300 251.000 457.0 76.834 3.560 -999.990 -999.990 0.768 ..P WKT 2010 07 24 12 19 55 31.3200 -97.3300 251.000 30.0 77.937 2.840 -999.990 -999.990 0.779 ..P WKT 2010 07 24 12 24 55 31.3200 -97.3300 251.000 122.0 80.726 2.990 -999.990 -999.990 0.807 ..P WKT 2010 07 24 12 29 55 31.3200 -97.3300 251.000 457.0 72.279 3.380 -999.990 -999.990 0.723 ..P WKT 2010 07 24 12 34 55 31.3200 -97.3300 251.000 30.0 81.809 3.130 -999.990 -999.990 0.818 ..P WKT 2010 07 24 12 39 55 31.3200 -97.3300 251.000 122.0 81.789 3.270 -999.990 -999.990 0.818 ..P WKT 2010 07 24 12 44 55 31.3200 -97.3300 251.000 457.0 73.062 3.060 -999.990 -999.990 0.731 ..P WKT 2010 07 24 12 54 55 31.3200 -97.3300 251.000 30.0 82.603 3.630 -999.990 -999.990 0.826 ..P WKT 2010 07 24 12 59 55 31.3200 -97.3300 251.000 122.0 84.582 2.870 -999.990 -999.990 0.846 ..P WKT 2010 07 24 13 04 55 31.3200 -97.3300 251.000 457.0 75.603 3.590 -999.990 -999.990 0.756 ..P WKT 2010 07 24 13 09 55 31.3200 -97.3300 251.000 30.0 89.099 2.680 -999.990 -999.990 0.891 ..P WKT 2010 07 24 13 14 55 31.3200 -97.3300 251.000 122.0 88.548 2.920 -999.990 -999.990 0.885 ..P WKT 2010 07 24 13 19 55 31.3200 -97.3300 251.000 457.0 76.760 2.850 -999.990 -999.990 0.768 ..P WKT 2010 07 24 13 29 55 31.3200 -97.3300 251.000 30.0 93.880 2.520 -999.990 -999.990 0.939 ..P WKT 2010 07 24 13 34 55 31.3200 -97.3300 251.000 122.0 87.108 2.470 -999.990 -999.990 0.871 ..P WKT 2010 07 24 13 39 55 31.3200 -97.3300 251.000 457.0 70.223 2.290 -999.990 -999.990 0.702 ..P WKT 2010 07 24 13 44 55 31.3200 -97.3300 251.000 30.0 81.994 2.910 -999.990 -999.990 0.820 ..P WKT 2010 07 24 13 49 55 31.3200 -97.3300 251.000 122.0 86.741 2.510 -999.990 -999.990 0.867 ..P WKT 2010 07 24 13 54 55 31.3200 -97.3300 251.000 457.0 69.854 3.720 -999.990 -999.990 0.699 ..P WKT 2010 07 24 14 04 55 31.3200 -97.3300 251.000 30.0 77.885 2.460 -999.990 -999.990 0.779 ..P WKT 2010 07 24 14 09 55 31.3200 -97.3300 251.000 122.0 82.151 3.170 -999.990 -999.990 0.822 ..P WKT 2010 07 24 14 14 55 31.3200 -97.3300 251.000 457.0 70.822 4.080 -999.990 -999.990 0.708 ..P WKT 2010 07 24 14 19 55 31.3200 -97.3300 251.000 30.0 85.906 2.800 -999.990 -999.990 0.859 ..P WKT 2010 07 24 14 24 55 31.3200 -97.3300 251.000 122.0 88.908 3.740 -999.990 -999.990 0.889 ..P WKT 2010 07 24 14 29 55 31.3200 -97.3300 251.000 457.0 72.943 2.810 -999.990 -999.990 0.729 ..P WKT 2010 07 24 14 39 55 31.3200 -97.3300 251.000 30.0 85.831 3.140 -999.990 -999.990 0.858 ..P WKT 2010 07 24 14 44 55 31.3200 -97.3300 251.000 122.0 87.428 3.010 -999.990 -999.990 0.874 ..P WKT 2010 07 24 14 49 55 31.3200 -97.3300 251.000 457.0 75.396 4.330 -999.990 -999.990 0.754 ..P WKT 2010 07 24 14 54 55 31.3200 -97.3300 251.000 30.0 85.142 3.600 -999.990 -999.990 0.851 ..P WKT 2010 07 24 14 59 55 31.3200 -97.3300 251.000 122.0 86.037 4.040 -999.990 -999.990 0.860 ..P WKT 2010 07 24 15 04 55 31.3200 -97.3300 251.000 457.0 80.187 4.160 -999.990 -999.990 0.802 ..P WKT 2010 07 24 15 14 55 31.3200 -97.3300 251.000 30.0 82.819 4.360 -999.990 -999.990 0.828 ..P WKT 2010 07 24 15 19 55 31.3200 -97.3300 251.000 122.0 89.194 4.020 -999.990 -999.990 0.892 ..P WKT 2010 07 24 15 24 55 31.3200 -97.3300 251.000 457.0 82.079 4.170 -999.990 -999.990 0.821 ..P WKT 2010 07 24 15 29 55 31.3200 -97.3300 251.000 30.0 79.180 3.930 -999.990 -999.990 0.792 ..P WKT 2010 07 24 15 34 55 31.3200 -97.3300 251.000 122.0 83.727 4.350 -999.990 -999.990 0.837 ..P WKT 2010 07 24 15 39 55 31.3200 -97.3300 251.000 457.0 74.785 3.950 -999.990 -999.990 0.748 ..P WKT 2010 07 24 15 49 55 31.3200 -97.3300 251.000 30.0 75.570 3.750 -999.990 -999.990 0.756 ..P WKT 2010 07 24 15 54 55 31.3200 -97.3300 251.000 122.0 85.298 3.250 -999.990 -999.990 0.853 ..P WKT 2010 07 24 15 59 55 31.3200 -97.3300 251.000 457.0 75.071 3.250 -999.990 -999.990 0.751 ..P WKT 2010 07 24 16 04 55 31.3200 -97.3300 251.000 30.0 81.426 4.190 -999.990 -999.990 0.814 ..P WKT 2010 07 24 16 09 55 31.3200 -97.3300 251.000 122.0 87.220 3.340 -999.990 -999.990 0.872 ..P WKT 2010 07 24 16 14 55 31.3200 -97.3300 251.000 457.0 87.111 2.560 -999.990 -999.990 0.871 ..P WKT 2010 07 24 16 24 55 31.3200 -97.3300 251.000 30.0 86.973 2.720 -999.990 -999.990 0.870 ..P WKT 2010 07 24 16 29 55 31.3200 -97.3300 251.000 122.0 89.755 2.340 -999.990 -999.990 0.898 ..P WKT 2010 07 24 16 34 55 31.3200 -97.3300 251.000 457.0 81.574 2.270 -999.990 -999.990 0.816 ..P WKT 2010 07 24 16 39 55 31.3200 -97.3300 251.000 30.0 79.859 3.040 -999.990 -999.990 0.799 ..P WKT 2010 07 24 16 44 55 31.3200 -97.3300 251.000 122.0 88.544 3.170 -999.990 -999.990 0.885 ..P WKT 2010 07 24 16 49 55 31.3200 -97.3300 251.000 457.0 77.833 1.940 -999.990 -999.990 0.778 ..P WKT 2010 07 24 17 04 55 31.3200 -97.3300 251.000 30.0 84.715 4.020 -999.990 -999.990 0.847 ..P WKT 2010 07 24 17 09 55 31.3200 -97.3300 251.000 122.0 95.761 5.180 -999.990 -999.990 0.958 ..P WKT 2010 07 24 17 14 55 31.3200 -97.3300 251.000 457.0 83.472 3.040 -999.990 -999.990 0.835 ..P WKT 2010 07 24 17 19 55 31.3200 -97.3300 251.000 30.0 80.461 3.110 -999.990 -999.990 0.805 ..P WKT 2010 07 24 17 24 55 31.3200 -97.3300 251.000 122.0 85.604 1.780 -999.990 -999.990 0.856 ..P WKT 2010 07 24 17 29 55 31.3200 -97.3300 251.000 457.0 85.967 3.040 -999.990 -999.990 0.860 ..P WKT 2010 07 24 17 39 55 31.3200 -97.3300 251.000 30.0 85.879 2.580 -999.990 -999.990 0.859 ..P WKT 2010 07 24 17 44 55 31.3200 -97.3300 251.000 122.0 92.176 2.590 -999.990 -999.990 0.922 ..P WKT 2010 07 24 17 49 55 31.3200 -97.3300 251.000 457.0 86.102 2.750 -999.990 -999.990 0.861 ..P WKT 2010 07 24 17 54 55 31.3200 -97.3300 251.000 30.0 88.745 2.950 -999.990 -999.990 0.887 ..P WKT 2010 07 24 17 59 55 31.3200 -97.3300 251.000 122.0 91.528 3.950 -999.990 -999.990 0.915 ..P WKT 2010 07 24 18 04 55 31.3200 -97.3300 251.000 457.0 84.189 4.340 -999.990 -999.990 0.842 ..P WKT 2010 07 24 18 14 55 31.3200 -97.3300 251.000 30.0 84.171 3.940 -999.990 -999.990 0.842 ..P WKT 2010 07 24 18 19 55 31.3200 -97.3300 251.000 122.0 91.916 4.760 -999.990 -999.990 0.919 ..P WKT 2010 07 24 18 24 55 31.3200 -97.3300 251.000 457.0 78.991 4.250 -999.990 -999.990 0.790 ..P WKT 2010 07 24 18 29 55 31.3200 -97.3300 251.000 30.0 83.501 3.790 -999.990 -999.990 0.835 ..P WKT 2010 07 24 18 34 55 31.3200 -97.3300 251.000 122.0 100.246 3.690 -999.990 -999.990 1.002 ..P WKT 2010 07 24 18 39 55 31.3200 -97.3300 251.000 457.0 80.993 3.670 -999.990 -999.990 0.810 ..P WKT 2010 07 24 18 49 55 31.3200 -97.3300 251.000 30.0 83.808 3.590 -999.990 -999.990 0.838 ..P WKT 2010 07 24 18 54 55 31.3200 -97.3300 251.000 122.0 90.268 3.350 -999.990 -999.990 0.903 ..P WKT 2010 07 24 18 59 55 31.3200 -97.3300 251.000 457.0 81.400 3.530 -999.990 -999.990 0.814 ..P WKT 2010 07 24 19 04 55 31.3200 -97.3300 251.000 30.0 78.860 3.520 -999.990 -999.990 0.789 ..P WKT 2010 07 24 19 09 55 31.3200 -97.3300 251.000 122.0 88.976 3.070 -999.990 -999.990 0.890 ..P WKT 2010 07 24 19 14 55 31.3200 -97.3300 251.000 457.0 76.311 4.060 -999.990 -999.990 0.763 ..P WKT 2010 07 24 19 24 55 31.3200 -97.3300 251.000 30.0 83.204 2.770 -999.990 -999.990 0.832 ..P WKT 2010 07 24 19 29 55 31.3200 -97.3300 251.000 122.0 91.935 2.730 -999.990 -999.990 0.919 ..P WKT 2010 07 24 19 34 55 31.3200 -97.3300 251.000 457.0 82.665 2.750 -999.990 -999.990 0.827 ..P WKT 2010 07 24 19 39 55 31.3200 -97.3300 251.000 30.0 86.614 3.810 -999.990 -999.990 0.866 ..P WKT 2010 07 24 19 44 55 31.3200 -97.3300 251.000 122.0 91.266 2.780 -999.990 -999.990 0.913 ..P WKT 2010 07 24 19 49 55 31.3200 -97.3300 251.000 457.0 76.651 2.450 -999.990 -999.990 0.767 ..P WKT 2010 07 24 19 59 55 31.3200 -97.3300 251.000 30.0 74.443 2.900 -999.990 -999.990 0.744 ..P WKT 2010 07 24 20 04 55 31.3200 -97.3300 251.000 122.0 85.024 3.330 -999.990 -999.990 0.850 ..P WKT 2010 07 24 20 09 55 31.3200 -97.3300 251.000 457.0 80.413 3.070 -999.990 -999.990 0.804 ..P WKT 2010 07 24 20 14 55 31.3200 -97.3300 251.000 30.0 81.711 2.740 -999.990 -999.990 0.817 ..P WKT 2010 07 24 20 19 55 31.3200 -97.3300 251.000 122.0 91.448 2.710 -999.990 -999.990 0.914 ..P WKT 2010 07 24 20 24 55 31.3200 -97.3300 251.000 457.0 87.963 2.510 -999.990 -999.990 0.880 ..P WKT 2010 07 24 20 34 55 31.3200 -97.3300 251.000 30.0 84.529 3.120 -999.990 -999.990 0.845 ..P WKT 2010 07 24 20 39 55 31.3200 -97.3300 251.000 122.0 94.708 2.090 -999.990 -999.990 0.947 ..P WKT 2010 07 24 20 44 55 31.3200 -97.3300 251.000 457.0 92.791 2.650 -999.990 -999.990 0.928 ..P WKT 2010 07 24 20 49 55 31.3200 -97.3300 251.000 30.0 88.060 1.800 -999.990 -999.990 0.881 ..P WKT 2010 07 24 20 54 55 31.3200 -97.3300 251.000 122.0 97.115 2.860 -999.990 -999.990 0.971 ..P WKT 2010 07 24 20 59 55 31.3200 -97.3300 251.000 457.0 84.505 1.610 -999.990 -999.990 0.845 ..P WKT 2010 07 24 21 09 55 31.3200 -97.3300 251.000 30.0 87.423 1.440 -999.990 -999.990 0.874 ..P WKT 2010 07 24 21 14 55 31.3200 -97.3300 251.000 122.0 97.603 2.250 -999.990 -999.990 0.976 ..P WKT 2010 07 24 21 19 55 31.3200 -97.3300 251.000 457.0 81.336 3.070 -999.990 -999.990 0.813 ..P WKT 2010 07 24 21 24 55 31.3200 -97.3300 251.000 30.0 86.452 3.500 -999.990 -999.990 0.865 ..P WKT 2010 07 24 21 29 55 31.3200 -97.3300 251.000 122.0 92.976 3.080 -999.990 -999.990 0.930 ..P WKT 2010 07 24 21 34 55 31.3200 -97.3300 251.000 457.0 84.867 2.750 -999.990 -999.990 0.849 ..P WKT 2010 07 24 21 44 55 31.3200 -97.3300 251.000 30.0 92.347 2.150 -999.990 -999.990 0.923 ..P WKT 2010 07 24 21 49 55 31.3200 -97.3300 251.000 122.0 93.022 3.510 -999.990 -999.990 0.930 ..P WKT 2010 07 24 21 54 55 31.3200 -97.3300 251.000 457.0 90.038 3.410 -999.990 -999.990 0.900 ..P WKT 2010 07 24 21 59 55 31.3200 -97.3300 251.000 30.0 85.507 3.220 -999.990 -999.990 0.855 ..P WKT 2010 07 24 22 04 55 31.3200 -97.3300 251.000 122.0 99.971 2.590 -999.990 -999.990 1.000 ..P WKT 2010 07 24 22 09 55 31.3200 -97.3300 251.000 457.0 89.952 2.810 -999.990 -999.990 0.900 ..P WKT 2010 07 24 22 19 55 31.3200 -97.3300 251.000 30.0 91.764 2.840 -999.990 -999.990 0.918 ..P WKT 2010 07 24 22 24 55 31.3200 -97.3300 251.000 122.0 95.293 3.120 -999.990 -999.990 0.953 ..P WKT 2010 07 24 22 29 55 31.3200 -97.3300 251.000 457.0 86.440 3.870 -999.990 -999.990 0.864 ..P WKT 2010 07 24 22 34 55 31.3200 -97.3300 251.000 30.0 89.266 2.770 -999.990 -999.990 0.893 ..P WKT 2010 07 24 22 39 55 31.3200 -97.3300 251.000 122.0 95.047 2.160 -999.990 -999.990 0.950 ..P WKT 2010 07 24 22 44 55 31.3200 -97.3300 251.000 457.0 90.274 2.180 -999.990 -999.990 0.903 ..P WKT 2010 07 24 22 54 55 31.3200 -97.3300 251.000 30.0 86.296 3.000 -999.990 -999.990 0.863 ..P WKT 2010 07 24 22 59 55 31.3200 -97.3300 251.000 122.0 92.017 2.520 -999.990 -999.990 0.920 ..P WKT 2010 07 24 23 04 55 31.3200 -97.3300 251.000 457.0 85.635 3.240 -999.990 -999.990 0.856 ..P WKT 2010 07 24 23 09 55 31.3200 -97.3300 251.000 30.0 79.253 2.930 -999.990 -999.990 0.793 ..P WKT 2010 07 24 23 14 55 31.3200 -97.3300 251.000 122.0 94.122 4.890 -999.990 -999.990 0.941 ..P WKT 2010 07 24 23 19 55 31.3200 -97.3300 251.000 457.0 87.177 4.230 -999.990 -999.990 0.872 ..P WKT 2010 07 24 23 29 55 31.3200 -97.3300 251.000 30.0 82.108 4.130 -999.990 -999.990 0.821 ..P WKT 2010 07 24 23 34 55 31.3200 -97.3300 251.000 122.0 93.555 3.450 -999.990 -999.990 0.936 ..P WKT 2010 07 24 23 39 55 31.3200 -97.3300 251.000 457.0 91.632 3.440 -999.990 -999.990 0.916 ..P WKT 2010 07 24 23 44 55 31.3200 -97.3300 251.000 30.0 84.359 3.660 -999.990 -999.990 0.844 ..P WKT 2010 07 24 23 49 55 31.3200 -97.3300 251.000 122.0 94.681 3.900 -999.990 -999.990 0.947 ..P WKT 2010 07 25 00 09 55 31.3200 -97.3300 251.000 457.0 94.204 3.600 -999.990 -999.990 0.942 ..P WKT 2010 07 25 00 10 25 31.3200 -97.3300 251.000 457.0 89.979 3.840 -999.990 -999.990 0.900 ..P WKT 2010 07 25 00 10 55 31.3200 -97.3300 251.000 457.0 88.569 3.370 -999.990 -999.990 0.886 ..P WKT 2010 07 25 00 11 25 31.3200 -97.3300 251.000 457.0 83.501 3.350 -999.990 -999.990 0.835 ..P WKT 2010 07 25 00 11 55 31.3200 -97.3300 251.000 457.0 82.934 2.690 -999.990 -999.990 0.829 ..P WKT 2010 07 25 00 12 25 31.3200 -97.3300 251.000 457.0 88.840 3.330 -999.990 -999.990 0.888 ..P WKT 2010 07 25 00 12 55 31.3200 -97.3300 251.000 457.0 84.616 3.960 -999.990 -999.990 0.846 ..P WKT 2010 07 25 00 13 25 31.3200 -97.3300 251.000 457.0 89.115 2.790 -999.990 -999.990 0.891 ..P WKT 2010 07 25 00 13 55 31.3200 -97.3300 251.000 457.0 84.891 4.090 -999.990 -999.990 0.849 ..P WKT 2010 07 25 00 14 25 31.3200 -97.3300 251.000 457.0 86.294 4.070 -999.990 -999.990 0.863 ..P WKT 2010 07 25 00 14 55 31.3200 -97.3300 251.000 457.0 88.823 2.650 -999.990 -999.990 0.888 ..P WKT 2010 07 25 00 19 55 31.3200 -97.3300 251.000 30.0 84.851 3.450 -999.990 -999.990 0.849 ..P WKT 2010 07 25 00 24 55 31.3200 -97.3300 251.000 122.0 90.443 2.670 -999.990 -999.990 0.904 ..P WKT 2010 07 25 00 29 55 31.3200 -97.3300 251.000 457.0 92.378 2.440 -999.990 -999.990 0.924 ..P WKT 2010 07 25 00 34 55 31.3200 -97.3300 251.000 30.0 91.219 2.320 -999.990 -999.990 0.912 ..P WKT 2010 07 25 00 39 55 31.3200 -97.3300 251.000 122.0 93.152 4.010 -999.990 -999.990 0.932 ..P WKT 2010 07 25 00 44 55 31.3200 -97.3300 251.000 457.0 86.654 2.470 -999.990 -999.990 0.867 ..P WKT 2010 07 25 00 54 55 31.3200 -97.3300 251.000 30.0 90.552 1.990 -999.990 -999.990 0.906 ..P WKT 2010 07 25 00 59 55 31.3200 -97.3300 251.000 122.0 92.235 2.070 -999.990 -999.990 0.922 ..P WKT 2010 07 25 01 04 55 31.3200 -97.3300 251.000 457.0 84.367 2.050 -999.990 -999.990 0.844 ..P WKT 2010 07 25 01 09 55 31.3200 -97.3300 251.000 30.0 86.331 2.420 -999.990 -999.990 0.863 ..P WKT 2010 07 25 01 14 55 31.3200 -97.3300 251.000 122.0 92.507 2.390 -999.990 -999.990 0.925 ..P WKT 2010 07 25 01 19 55 31.3200 -97.3300 251.000 457.0 91.100 1.890 -999.990 -999.990 0.911 ..P WKT 2010 07 25 01 29 55 31.3200 -97.3300 251.000 30.0 89.210 2.470 -999.990 -999.990 0.892 ..P WKT 2010 07 25 01 34 55 31.3200 -97.3300 251.000 122.0 96.022 2.370 -999.990 -999.990 0.960 ..P WKT 2010 07 25 01 39 55 31.3200 -97.3300 251.000 457.0 88.243 3.570 -999.990 -999.990 0.882 ..P WKT 2010 07 25 01 44 55 31.3200 -97.3300 251.000 30.0 90.845 1.940 -999.990 -999.990 0.908 ..P WKT 2010 07 25 01 49 55 31.3200 -97.3300 251.000 122.0 94.568 2.650 -999.990 -999.990 0.946 ..P WKT 2010 07 25 01 54 55 31.3200 -97.3300 251.000 457.0 90.860 3.540 -999.990 -999.990 0.909 ..P WKT 2010 07 25 02 04 55 31.3200 -97.3300 251.000 30.0 95.339 2.690 -999.990 -999.990 0.953 ..P WKT 2010 07 25 02 09 55 31.3200 -97.3300 251.000 122.0 91.893 3.420 -999.990 -999.990 0.919 ..P WKT 2010 07 25 02 14 55 31.3200 -97.3300 251.000 457.0 92.230 3.460 -999.990 -999.990 0.922 ..P WKT 2010 07 25 02 19 55 31.3200 -97.3300 251.000 30.0 90.045 3.520 -999.990 -999.990 0.900 ..P WKT 2010 07 25 02 24 55 31.3200 -97.3300 251.000 122.0 92.484 3.690 -999.990 -999.990 0.925 ..P WKT 2010 07 25 02 29 55 31.3200 -97.3300 251.000 457.0 88.340 3.560 -999.990 -999.990 0.883 ..P WKT 2010 07 25 02 39 55 31.3200 -97.3300 251.000 30.0 97.935 3.830 -999.990 -999.990 0.979 ..P WKT 2010 07 25 02 44 55 31.3200 -97.3300 251.000 122.0 94.172 4.020 -999.990 -999.990 0.942 ..P WKT 2010 07 25 02 49 55 31.3200 -97.3300 251.000 457.0 92.929 4.120 -999.990 -999.990 0.929 ..P WKT 2010 07 25 02 54 55 31.3200 -97.3300 251.000 30.0 95.884 4.660 -999.990 -999.990 0.959 ..P WKT 2010 07 25 02 59 55 31.3200 -97.3300 251.000 122.0 100.097 4.050 -999.990 -999.990 1.001 ..P WKT 2010 07 25 03 04 55 31.3200 -97.3300 251.000 457.0 96.057 3.380 -999.990 -999.990 0.961 ..P WKT 2010 07 25 03 14 55 31.3200 -97.3300 251.000 30.0 99.305 4.290 -999.990 -999.990 0.993 ..P WKT 2010 07 25 03 19 55 31.3200 -97.3300 251.000 122.0 100.160 4.350 -999.990 -999.990 1.002 ..P WKT 2010 07 25 03 24 55 31.3200 -97.3300 251.000 457.0 93.886 4.420 -999.990 -999.990 0.939 ..P WKT 2010 07 25 03 29 55 31.3200 -97.3300 251.000 30.0 99.213 4.390 -999.990 -999.990 0.992 ..P WKT 2010 07 25 03 34 55 31.3200 -97.3300 251.000 122.0 91.264 4.140 -999.990 -999.990 0.913 ..P WKT 2010 07 25 03 39 55 31.3200 -97.3300 251.000 457.0 87.789 4.190 -999.990 -999.990 0.878 ..P WKT 2010 07 25 03 49 55 31.3200 -97.3300 251.000 30.0 96.044 3.640 -999.990 -999.990 0.960 ..P WKT 2010 07 25 03 54 55 31.3200 -97.3300 251.000 122.0 88.779 3.260 -999.990 -999.990 0.888 ..P WKT 2010 07 25 03 59 55 31.3200 -97.3300 251.000 457.0 85.147 2.540 -999.990 -999.990 0.851 ..P WKT 2010 07 25 04 04 55 31.3200 -97.3300 251.000 30.0 92.124 2.330 -999.990 -999.990 0.921 ..P WKT 2010 07 25 04 09 55 31.3200 -97.3300 251.000 122.0 92.401 1.850 -999.990 -999.990 0.924 ..P WKT 2010 07 25 04 14 55 31.3200 -97.3300 251.000 457.0 87.374 1.870 -999.990 -999.990 0.874 ..P WKT 2010 07 25 04 24 55 31.3200 -97.3300 251.000 30.0 98.011 1.550 -999.990 -999.990 0.980 ..P WKT 2010 07 25 04 29 55 31.3200 -97.3300 251.000 122.0 97.210 2.020 -999.990 -999.990 0.972 ..P WKT 2010 07 25 04 34 55 31.3200 -97.3300 251.000 457.0 93.621 2.550 -999.990 -999.990 0.936 ..P WKT 2010 07 25 04 39 55 31.3200 -97.3300 251.000 30.0 94.773 4.250 -999.990 -999.990 0.948 ..P WKT 2010 07 25 04 44 55 31.3200 -97.3300 251.000 122.0 97.598 3.130 -999.990 -999.990 0.976 ..P WKT 2010 07 25 04 49 55 31.3200 -97.3300 251.000 457.0 90.108 2.830 -999.990 -999.990 0.901 ..P WKT 2010 07 25 05 04 55 31.3200 -97.3300 251.000 30.0 96.408 3.100 -999.990 -999.990 0.964 ..P WKT 2010 07 25 05 09 55 31.3200 -97.3300 251.000 122.0 100.095 3.510 -999.990 -999.990 1.001 ..P WKT 2010 07 25 05 14 55 31.3200 -97.3300 251.000 457.0 91.805 3.520 -999.990 -999.990 0.918 ..P WKT 2010 07 25 05 19 55 31.3200 -97.3300 251.000 30.0 105.238 2.990 -999.990 -999.990 1.052 ..P WKT 2010 07 25 05 24 55 31.3200 -97.3300 251.000 122.0 106.972 4.660 -999.990 -999.990 1.070 ..P WKT 2010 07 25 05 29 55 31.3200 -97.3300 251.000 457.0 107.594 2.650 -999.990 -999.990 1.076 ..P WKT 2010 07 25 05 39 55 31.3200 -97.3300 251.000 30.0 106.459 3.160 -999.990 -999.990 1.065 ..P WKT 2010 07 25 05 44 55 31.3200 -97.3300 251.000 122.0 95.385 3.080 -999.990 -999.990 0.954 ..P WKT 2010 07 25 05 49 55 31.3200 -97.3300 251.000 457.0 142.591 3.810 -999.990 -999.990 1.426 ..P WKT 2010 07 25 05 54 55 31.3200 -97.3300 251.000 30.0 94.524 3.990 -999.990 -999.990 0.945 ..P WKT 2010 07 25 05 59 55 31.3200 -97.3300 251.000 122.0 103.200 2.850 -999.990 -999.990 1.032 ..P WKT 2010 07 25 06 04 55 31.3200 -97.3300 251.000 457.0 141.206 2.960 -999.990 -999.990 1.412 ..P WKT 2010 07 25 06 14 55 31.3200 -97.3300 251.000 30.0 108.506 3.820 -999.990 -999.990 1.085 ..P WKT 2010 07 25 06 19 55 31.3200 -97.3300 251.000 122.0 102.169 1.810 -999.990 -999.990 1.022 ..P WKT 2010 07 25 06 24 55 31.3200 -97.3300 251.000 457.0 122.228 2.670 -999.990 -999.990 1.222 ..P WKT 2010 07 25 06 29 55 31.3200 -97.3300 251.000 30.0 106.724 2.410 -999.990 -999.990 1.067 ..P WKT 2010 07 25 06 34 55 31.3200 -97.3300 251.000 122.0 89.279 3.130 -999.990 -999.990 0.893 ..P WKT 2010 07 25 06 39 55 31.3200 -97.3300 251.000 457.0 116.135 3.190 -999.990 -999.990 1.161 ..P WKT 2010 07 25 06 49 55 31.3200 -97.3300 251.000 30.0 110.628 4.110 -999.990 -999.990 1.106 ..P WKT 2010 07 25 06 54 55 31.3200 -97.3300 251.000 122.0 90.638 2.710 -999.990 -999.990 0.906 ..P WKT 2010 07 25 06 59 55 31.3200 -97.3300 251.000 457.0 107.842 2.890 -999.990 -999.990 1.078 ..P WKT 2010 07 25 07 04 55 31.3200 -97.3300 251.000 30.0 111.998 2.700 -999.990 -999.990 1.120 ..P WKT 2010 07 25 07 09 55 31.3200 -97.3300 251.000 122.0 99.230 3.070 -999.990 -999.990 0.992 ..P WKT 2010 07 25 07 14 55 31.3200 -97.3300 251.000 457.0 126.824 3.770 -999.990 -999.990 1.268 ..P WKT 2010 07 25 07 24 55 31.3200 -97.3300 251.000 30.0 109.893 2.740 -999.990 -999.990 1.099 ..P WKT 2010 07 25 07 29 55 31.3200 -97.3300 251.000 122.0 99.075 2.780 -999.990 -999.990 0.991 ..P WKT 2010 07 25 07 34 55 31.3200 -97.3300 251.000 457.0 100.595 2.830 -999.990 -999.990 1.006 ..P WKT 2010 07 25 07 39 55 31.3200 -97.3300 251.000 30.0 108.490 3.020 -999.990 -999.990 1.085 ..P WKT 2010 07 25 07 44 55 31.3200 -97.3300 251.000 122.0 117.766 2.240 -999.990 -999.990 1.178 ..P WKT 2010 07 25 07 49 55 31.3200 -97.3300 251.000 457.0 153.774 2.730 -999.990 -999.990 1.538 ..P WKT 2010 07 25 07 59 55 31.3200 -97.3300 251.000 30.0 115.727 3.420 -999.990 -999.990 1.157 ..P WKT 2010 07 25 08 04 55 31.3200 -97.3300 251.000 122.0 115.364 2.510 -999.990 -999.990 1.154 ..P WKT 2010 07 25 08 09 55 31.3200 -97.3300 251.000 457.0 147.670 2.900 -999.990 -999.990 1.477 ..P WKT 2010 07 25 08 14 55 31.3200 -97.3300 251.000 30.0 112.424 2.850 -999.990 -999.990 1.124 ..P WKT 2010 07 25 08 19 55 31.3200 -97.3300 251.000 122.0 119.811 3.200 -999.990 -999.990 1.198 ..P WKT 2010 07 25 08 24 55 31.3200 -97.3300 251.000 457.0 116.680 3.450 -999.990 -999.990 1.167 ..P WKT 2010 07 25 08 34 55 31.3200 -97.3300 251.000 30.0 113.268 3.070 -999.990 -999.990 1.133 ..P WKT 2010 07 25 08 39 55 31.3200 -97.3300 251.000 122.0 121.006 3.280 -999.990 -999.990 1.210 ..P WKT 2010 07 25 08 44 55 31.3200 -97.3300 251.000 457.0 133.718 3.160 -999.990 -999.990 1.337 ..P WKT 2010 07 25 08 49 55 31.3200 -97.3300 251.000 30.0 111.037 3.510 -999.990 -999.990 1.110 ..P WKT 2010 07 25 08 54 55 31.3200 -97.3300 251.000 122.0 115.178 4.390 -999.990 -999.990 1.152 ..P WKT 2010 07 25 08 59 55 31.3200 -97.3300 251.000 457.0 105.774 4.070 -999.990 -999.990 1.058 ..P WKT 2010 07 25 09 09 55 31.3200 -97.3300 251.000 30.0 116.124 3.600 -999.990 -999.990 1.161 ..P WKT 2010 07 25 09 14 55 31.3200 -97.3300 251.000 122.0 114.598 3.760 -999.990 -999.990 1.146 ..P WKT 2010 07 25 09 19 55 31.3200 -97.3300 251.000 457.0 83.796 3.390 -999.990 -999.990 0.838 ..P WKT 2010 07 25 09 24 55 31.3200 -97.3300 251.000 30.0 114.309 3.950 -999.990 -999.990 1.143 ..P WKT 2010 07 25 09 29 55 31.3200 -97.3300 251.000 122.0 102.291 3.830 -999.990 -999.990 1.023 ..P WKT 2010 07 25 09 34 55 31.3200 -97.3300 251.000 457.0 111.258 3.800 -999.990 -999.990 1.113 ..P WKT 2010 07 25 09 44 55 31.3200 -97.3300 251.000 30.0 107.265 3.120 -999.990 -999.990 1.073 ..P WKT 2010 07 25 09 49 55 31.3200 -97.3300 251.000 122.0 95.001 4.110 -999.990 -999.990 0.950 ..P WKT 2010 07 25 09 54 55 31.3200 -97.3300 251.000 457.0 105.500 4.210 -999.990 -999.990 1.055 ..P WKT 2010 07 25 09 59 55 31.3200 -97.3300 251.000 30.0 110.342 4.090 -999.990 -999.990 1.103 ..P WKT 2010 07 25 10 04 55 31.3200 -97.3300 251.000 122.0 105.805 3.220 -999.990 -999.990 1.058 ..P WKT 2010 07 25 10 09 55 31.3200 -97.3300 251.000 457.0 139.596 4.380 -999.990 -999.990 1.396 ..P WKT 2010 07 25 10 19 55 31.3200 -97.3300 251.000 30.0 114.373 4.390 -999.990 -999.990 1.144 ..P WKT 2010 07 25 10 24 55 31.3200 -97.3300 251.000 122.0 97.556 4.070 -999.990 -999.990 0.976 ..P WKT 2010 07 25 10 29 55 31.3200 -97.3300 251.000 457.0 128.551 5.610 -999.990 -999.990 1.286 ..P WKT 2010 07 25 10 34 55 31.3200 -97.3300 251.000 30.0 116.420 4.860 -999.990 -999.990 1.164 ..P WKT 2010 07 25 10 39 55 31.3200 -97.3300 251.000 122.0 104.293 4.570 -999.990 -999.990 1.043 ..P WKT 2010 07 25 10 44 55 31.3200 -97.3300 251.000 457.0 96.439 4.650 -999.990 -999.990 0.964 ..P WKT 2010 07 25 10 54 55 31.3200 -97.3300 251.000 30.0 113.678 5.290 -999.990 -999.990 1.137 ..P WKT 2010 07 25 10 59 55 31.3200 -97.3300 251.000 122.0 108.619 5.720 -999.990 -999.990 1.086 ..P WKT 2010 07 25 11 04 55 31.3200 -97.3300 251.000 457.0 92.828 4.270 -999.990 -999.990 0.928 ..P WKT 2010 07 25 11 09 55 31.3200 -97.3300 251.000 30.0 119.143 4.510 -999.990 -999.990 1.191 ..P WKT 2010 07 25 11 14 55 31.3200 -97.3300 251.000 122.0 109.270 4.820 -999.990 -999.990 1.093 ..P WKT 2010 07 25 11 19 55 31.3200 -97.3300 251.000 457.0 95.413 3.840 -999.990 -999.990 0.954 ..P WKT 2010 07 25 11 29 55 31.3200 -97.3300 251.000 30.0 112.236 3.540 -999.990 -999.990 1.122 ..P WKT 2010 07 25 11 34 55 31.3200 -97.3300 251.000 122.0 119.258 3.480 -999.990 -999.990 1.193 ..P WKT 2010 07 25 11 39 55 31.3200 -97.3300 251.000 457.0 97.414 3.160 -999.990 -999.990 0.974 ..P WKT 2010 07 25 11 44 55 31.3200 -97.3300 251.000 30.0 116.804 4.280 -999.990 -999.990 1.168 ..P WKT 2010 07 25 11 49 55 31.3200 -97.3300 251.000 122.0 122.173 4.620 -999.990 -999.990 1.222 ..P WKT 2010 07 25 12 09 55 31.3200 -97.3300 251.000 457.0 103.316 4.770 -999.990 -999.990 1.033 ..P WKT 2010 07 25 12 10 25 31.3200 -97.3300 251.000 457.0 105.289 3.640 -999.990 -999.990 1.053 ..P WKT 2010 07 25 12 10 55 31.3200 -97.3300 251.000 457.0 95.450 3.210 -999.990 -999.990 0.955 ..P WKT 2010 07 25 12 11 25 31.3200 -97.3300 251.000 457.0 100.721 3.740 -999.990 -999.990 1.007 ..P WKT 2010 07 25 12 11 55 31.3200 -97.3300 251.000 457.0 99.123 2.670 -999.990 -999.990 0.991 ..P WKT 2010 07 25 12 12 25 31.3200 -97.3300 251.000 457.0 108.513 3.970 -999.990 -999.990 1.085 ..P WKT 2010 07 25 12 12 55 31.3200 -97.3300 251.000 457.0 110.486 3.250 -999.990 -999.990 1.105 ..P WKT 2010 07 25 12 13 25 31.3200 -97.3300 251.000 457.0 116.305 3.470 -999.990 -999.990 1.163 ..P WKT 2010 07 25 12 13 55 31.3200 -97.3300 251.000 457.0 118.279 3.140 -999.990 -999.990 1.183 ..P WKT 2010 07 25 12 14 25 31.3200 -97.3300 251.000 457.0 108.715 4.040 -999.990 -999.990 1.087 ..P WKT 2010 07 25 12 14 55 31.3200 -97.3300 251.000 457.0 113.710 3.580 -999.990 -999.990 1.137 ..P WKT 2010 07 25 12 19 55 31.3200 -97.3300 251.000 30.0 101.303 3.950 -999.990 -999.990 1.013 ..P WKT 2010 07 25 12 24 55 31.3200 -97.3300 251.000 122.0 98.512 4.460 -999.990 -999.990 0.985 ..P WKT 2010 07 25 12 29 55 31.3200 -97.3300 251.000 457.0 113.025 3.550 -999.990 -999.990 1.130 ..P WKT 2010 07 25 12 34 55 31.3200 -97.3300 251.000 30.0 112.980 4.370 -999.990 -999.990 1.130 ..P WKT 2010 07 25 12 39 55 31.3200 -97.3300 251.000 122.0 106.618 3.440 -999.990 -999.990 1.066 ..P WKT 2010 07 25 12 44 55 31.3200 -97.3300 251.000 457.0 96.686 3.300 -999.990 -999.990 0.967 ..P WKT 2010 07 25 12 54 55 31.3200 -97.3300 251.000 30.0 111.261 2.830 -999.990 -999.990 1.113 ..P WKT 2010 07 25 12 59 55 31.3200 -97.3300 251.000 122.0 111.050 2.750 -999.990 -999.990 1.111 ..P WKT 2010 07 25 13 04 55 31.3200 -97.3300 251.000 457.0 95.186 3.240 -999.990 -999.990 0.952 ..P WKT 2010 07 25 13 09 55 31.3200 -97.3300 251.000 30.0 112.826 2.350 -999.990 -999.990 1.128 ..P WKT 2010 07 25 13 14 55 31.3200 -97.3300 251.000 122.0 121.677 3.130 -999.990 -999.990 1.217 ..P WKT 2010 07 25 13 19 55 31.3200 -97.3300 251.000 457.0 89.338 3.760 -999.990 -999.990 0.893 ..P WKT 2010 07 25 13 29 55 31.3200 -97.3300 251.000 30.0 112.258 2.910 -999.990 -999.990 1.123 ..P WKT 2010 07 25 13 34 55 31.3200 -97.3300 251.000 122.0 108.478 2.010 -999.990 -999.990 1.085 ..P WKT 2010 07 25 13 39 55 31.3200 -97.3300 251.000 457.0 106.208 2.200 -999.990 -999.990 1.062 ..P WKT 2010 07 25 13 44 55 31.3200 -97.3300 251.000 30.0 107.782 2.130 -999.990 -999.990 1.078 ..P WKT 2010 07 25 13 49 55 31.3200 -97.3300 251.000 122.0 92.608 2.690 -999.990 -999.990 0.926 ..P WKT 2010 07 25 13 54 55 31.3200 -97.3300 251.000 457.0 87.319 2.750 -999.990 -999.990 0.873 ..P WKT 2010 07 25 14 04 55 31.3200 -97.3300 251.000 30.0 112.000 2.610 -999.990 -999.990 1.120 ..P WKT 2010 07 25 14 09 55 31.3200 -97.3300 251.000 122.0 85.277 2.710 -999.990 -999.990 0.853 ..P WKT 2010 07 25 14 14 55 31.3200 -97.3300 251.000 457.0 99.460 2.790 -999.990 -999.990 0.995 ..P WKT 2010 07 25 14 19 55 31.3200 -97.3300 251.000 30.0 114.192 3.110 -999.990 -999.990 1.142 ..P WKT 2010 07 25 14 24 55 31.3200 -97.3300 251.000 122.0 85.138 3.820 -999.990 -999.990 0.851 ..P WKT 2010 07 25 14 29 55 31.3200 -97.3300 251.000 457.0 105.084 3.580 -999.990 -999.990 1.051 ..P WKT 2010 07 25 14 39 55 31.3200 -97.3300 251.000 30.0 112.212 4.140 -999.990 -999.990 1.122 ..P WKT 2010 07 25 14 44 55 31.3200 -97.3300 251.000 122.0 110.786 4.170 -999.990 -999.990 1.108 ..P WKT 2010 07 25 14 49 55 31.3200 -97.3300 251.000 457.0 111.693 2.560 -999.990 -999.990 1.117 ..P WKT 2010 07 25 14 54 55 31.3200 -97.3300 251.000 30.0 107.248 3.470 -999.990 -999.990 1.072 ..P WKT 2010 07 25 14 59 55 31.3200 -97.3300 251.000 122.0 107.605 2.080 -999.990 -999.990 1.076 ..P WKT 2010 07 25 15 04 55 31.3200 -97.3300 251.000 457.0 115.237 1.940 -999.990 -999.990 1.152 ..P WKT 2010 07 25 15 14 55 31.3200 -97.3300 251.000 30.0 98.408 2.560 -999.990 -999.990 0.984 ..P WKT 2010 07 25 15 19 55 31.3200 -97.3300 251.000 122.0 101.804 3.440 -999.990 -999.990 1.018 ..P WKT 2010 07 25 15 24 55 31.3200 -97.3300 251.000 457.0 112.474 4.000 -999.990 -999.990 1.125 ..P WKT 2010 07 25 15 29 55 31.3200 -97.3300 251.000 30.0 97.209 4.250 -999.990 -999.990 0.972 ..P WKT 2010 07 25 15 34 55 31.3200 -97.3300 251.000 122.0 110.759 3.520 -999.990 -999.990 1.108 ..P WKT 2010 07 25 15 39 55 31.3200 -97.3300 251.000 457.0 116.488 3.500 -999.990 -999.990 1.165 ..P WKT 2010 07 25 15 49 55 31.3200 -97.3300 251.000 30.0 106.796 3.590 -999.990 -999.990 1.068 ..P WKT 2010 07 25 15 54 55 31.3200 -97.3300 251.000 122.0 111.681 3.510 -999.990 -999.990 1.117 ..P WKT 2010 07 25 15 59 55 31.3200 -97.3300 251.000 457.0 104.219 4.890 -999.990 -999.990 1.042 ..P WKT 2010 07 25 16 04 55 31.3200 -97.3300 251.000 30.0 99.227 3.950 -999.990 -999.990 0.992 ..P WKT 2010 07 25 16 09 55 31.3200 -97.3300 251.000 122.0 108.503 4.110 -999.990 -999.990 1.085 ..P WKT 2010 07 25 16 14 55 31.3200 -97.3300 251.000 457.0 104.334 3.460 -999.990 -999.990 1.043 ..P WKT 2010 07 25 16 24 55 31.3200 -97.3300 251.000 30.0 100.660 3.750 -999.990 -999.990 1.007 ..P WKT 2010 07 25 16 29 55 31.3200 -97.3300 251.000 122.0 112.952 3.400 -999.990 -999.990 1.130 ..P WKT 2010 07 25 16 34 55 31.3200 -97.3300 251.000 457.0 102.748 4.100 -999.990 -999.990 1.027 ..P WKT 2010 07 25 16 39 55 31.3200 -97.3300 251.000 30.0 104.615 2.890 -999.990 -999.990 1.046 ..P WKT 2010 07 25 16 44 55 31.3200 -97.3300 251.000 122.0 110.871 2.360 -999.990 -999.990 1.109 ..P WKT 2010 07 25 16 49 55 31.3200 -97.3300 251.000 457.0 105.880 3.440 -999.990 -999.990 1.059 ..P WKT 2010 07 25 17 04 55 31.3200 -97.3300 251.000 30.0 111.626 2.690 -999.990 -999.990 1.116 ..P WKT 2010 07 25 17 09 55 31.3200 -97.3300 251.000 122.0 117.543 2.820 -999.990 -999.990 1.175 ..P WKT 2010 07 25 17 14 55 31.3200 -97.3300 251.000 457.0 103.986 2.490 -999.990 -999.990 1.040 ..P WKT 2010 07 25 17 19 55 31.3200 -97.3300 251.000 30.0 107.160 2.110 -999.990 -999.990 1.072 ..P WKT 2010 07 25 17 24 55 31.3200 -97.3300 251.000 122.0 117.466 1.870 -999.990 -999.990 1.175 ..P WKT 2010 07 25 17 29 55 31.3200 -97.3300 251.000 457.0 112.412 4.820 -999.990 -999.990 1.124 ..P WKT 2010 07 25 17 39 55 31.3200 -97.3300 251.000 30.0 109.263 2.200 -999.990 -999.990 1.093 ..P WKT 2010 07 25 17 44 55 31.3200 -97.3300 251.000 122.0 121.452 3.420 -999.990 -999.990 1.215 ..P WKT 2010 07 25 17 49 55 31.3200 -97.3300 251.000 457.0 111.017 3.540 -999.990 -999.990 1.110 ..P WKT 2010 07 25 17 54 55 31.3200 -97.3300 251.000 30.0 111.962 3.950 -999.990 -999.990 1.120 ..P WKT 2010 07 25 17 59 55 31.3200 -97.3300 251.000 122.0 105.504 4.010 -999.990 -999.990 1.055 ..P WKT 2010 07 25 18 04 55 31.3200 -97.3300 251.000 457.0 107.546 2.260 -999.990 -999.990 1.075 ..P WKT 2010 07 25 18 14 55 31.3200 -97.3300 251.000 30.0 103.992 2.560 -999.990 -999.990 1.040 ..P WKT 2010 07 25 18 19 55 31.3200 -97.3300 251.000 122.0 105.936 4.550 -999.990 -999.990 1.059 ..P WKT 2010 07 25 18 24 55 31.3200 -97.3300 251.000 457.0 98.832 4.370 -999.990 -999.990 0.988 ..P WKT 2010 07 25 18 29 55 31.3200 -97.3300 251.000 30.0 98.857 5.860 -999.990 -999.990 0.989 ..P WKT 2010 07 25 18 34 55 31.3200 -97.3300 251.000 122.0 108.204 5.120 -999.990 -999.990 1.082 ..P WKT 2010 07 25 18 39 55 31.3200 -97.3300 251.000 457.0 96.303 3.180 -999.990 -999.990 0.963 ..P WKT 2010 07 25 18 49 55 31.3200 -97.3300 251.000 30.0 94.140 4.100 -999.990 -999.990 0.941 ..P WKT 2010 07 25 18 54 55 31.3200 -97.3300 251.000 122.0 105.523 4.930 -999.990 -999.990 1.055 ..P WKT 2010 07 25 18 59 55 31.3200 -97.3300 251.000 457.0 93.877 5.930 -999.990 -999.990 0.939 ..P WKT 2010 07 25 19 04 55 31.3200 -97.3300 251.000 30.0 107.178 4.540 -999.990 -999.990 1.072 ..P WKT 2010 07 25 19 09 55 31.3200 -97.3300 251.000 122.0 111.433 4.340 -999.990 -999.990 1.114 ..P WKT 2010 07 25 19 14 55 31.3200 -97.3300 251.000 457.0 102.117 3.680 -999.990 -999.990 1.021 ..P WKT 2010 07 25 19 24 55 31.3200 -97.3300 251.000 30.0 96.255 3.140 -999.990 -999.990 0.963 ..P WKT 2010 07 25 19 29 55 31.3200 -97.3300 251.000 122.0 108.203 3.940 -999.990 -999.990 1.082 ..P WKT 2010 07 25 19 34 55 31.3200 -97.3300 251.000 457.0 106.310 4.710 -999.990 -999.990 1.063 ..P WKT 2010 07 25 19 39 55 31.3200 -97.3300 251.000 30.0 104.005 4.640 -999.990 -999.990 1.040 ..P WKT 2010 07 25 19 44 55 31.3200 -97.3300 251.000 122.0 107.730 4.230 -999.990 -999.990 1.077 ..P WKT 2010 07 25 19 49 55 31.3200 -97.3300 251.000 457.0 99.669 2.720 -999.990 -999.990 0.997 ..P WKT 2010 07 25 19 59 55 31.3200 -97.3300 251.000 30.0 100.366 2.810 -999.990 -999.990 1.004 ..P WKT 2010 07 25 20 04 55 31.3200 -97.3300 251.000 122.0 113.779 4.030 -999.990 -999.990 1.138 ..P WKT 2010 07 25 20 09 55 31.3200 -97.3300 251.000 457.0 110.203 4.790 -999.990 -999.990 1.102 ..P WKT 2010 07 25 20 14 55 31.3200 -97.3300 251.000 30.0 112.106 5.350 -999.990 -999.990 1.121 ..P WKT 2010 07 25 20 19 55 31.3200 -97.3300 251.000 122.0 115.928 4.520 -999.990 -999.990 1.159 ..P WKT 2010 07 25 20 24 55 31.3200 -97.3300 251.000 457.0 109.338 2.900 -999.990 -999.990 1.093 ..P WKT 2010 07 25 20 34 55 31.3200 -97.3300 251.000 30.0 106.608 2.830 -999.990 -999.990 1.066 ..P WKT 2010 07 25 20 39 55 31.3200 -97.3300 251.000 122.0 112.935 4.770 -999.990 -999.990 1.129 ..P WKT 2010 07 25 20 44 55 31.3200 -97.3300 251.000 457.0 106.383 5.780 -999.990 -999.990 1.064 ..P WKT 2010 07 25 20 49 55 31.3200 -97.3300 251.000 30.0 102.847 5.080 -999.990 -999.990 1.028 ..P WKT 2010 07 25 20 54 55 31.3200 -97.3300 251.000 122.0 113.831 3.960 -999.990 -999.990 1.138 ..P WKT 2010 07 25 20 59 55 31.3200 -97.3300 251.000 457.0 103.170 2.700 -999.990 -999.990 1.032 ..P WKT 2010 07 25 21 09 55 31.3200 -97.3300 251.000 30.0 96.234 2.680 -999.990 -999.990 0.962 ..P WKT 2010 07 25 21 14 55 31.3200 -97.3300 251.000 122.0 114.477 4.020 -999.990 -999.990 1.145 ..P WKT 2010 07 25 21 19 55 31.3200 -97.3300 251.000 457.0 102.038 5.840 -999.990 -999.990 1.020 ..P WKT 2010 07 25 21 24 55 31.3200 -97.3300 251.000 30.0 104.665 4.340 -999.990 -999.990 1.047 ..P WKT 2010 07 25 21 29 55 31.3200 -97.3300 251.000 122.0 115.921 4.030 -999.990 -999.990 1.159 ..P WKT 2010 07 25 21 34 55 31.3200 -97.3300 251.000 457.0 113.891 4.560 -999.990 -999.990 1.139 ..P WKT 2010 07 25 21 44 55 31.3200 -97.3300 251.000 30.0 108.404 4.350 -999.990 -999.990 1.084 ..P WKT 2010 07 25 21 49 55 31.3200 -97.3300 251.000 122.0 119.189 3.820 -999.990 -999.990 1.192 ..P WKT 2010 07 25 21 54 55 31.3200 -97.3300 251.000 457.0 107.651 4.320 -999.990 -999.990 1.077 ..P WKT 2010 07 25 21 59 55 31.3200 -97.3300 251.000 30.0 106.933 4.220 -999.990 -999.990 1.069 ..P WKT 2010 07 25 22 04 55 31.3200 -97.3300 251.000 122.0 121.277 3.680 -999.990 -999.990 1.213 ..P WKT 2010 07 25 22 09 55 31.3200 -97.3300 251.000 457.0 112.479 2.670 -999.990 -999.990 1.125 ..P WKT 2010 07 25 22 19 55 31.3200 -97.3300 251.000 30.0 103.805 2.040 -999.990 -999.990 1.038 ..P WKT 2010 07 25 22 24 55 31.3200 -97.3300 251.000 122.0 113.375 2.730 -999.990 -999.990 1.134 ..P WKT 2010 07 25 22 29 55 31.3200 -97.3300 251.000 457.0 107.884 4.370 -999.990 -999.990 1.079 ..P WKT 2010 07 25 22 34 55 31.3200 -97.3300 251.000 30.0 105.679 3.690 -999.990 -999.990 1.057 ..P WKT 2010 07 25 22 39 55 31.3200 -97.3300 251.000 122.0 112.373 5.060 -999.990 -999.990 1.124 ..P WKT 2010 07 25 22 44 55 31.3200 -97.3300 251.000 457.0 117.288 5.160 -999.990 -999.990 1.173 ..P WKT 2010 07 25 22 54 55 31.3200 -97.3300 251.000 30.0 115.890 5.170 -999.990 -999.990 1.159 ..P WKT 2010 07 25 22 59 55 31.3200 -97.3300 251.000 122.0 122.035 5.930 -999.990 -999.990 1.220 ..P WKT 2010 07 25 23 04 55 31.3200 -97.3300 251.000 457.0 109.016 4.310 -999.990 -999.990 1.090 ..P WKT 2010 07 25 23 09 55 31.3200 -97.3300 251.000 30.0 105.990 4.210 -999.990 -999.990 1.060 ..P WKT 2010 07 25 23 14 55 31.3200 -97.3300 251.000 122.0 120.075 3.740 -999.990 -999.990 1.201 ..P WKT 2010 07 25 23 19 55 31.3200 -97.3300 251.000 457.0 105.140 4.110 -999.990 -999.990 1.051 ..P WKT 2010 07 25 23 29 55 31.3200 -97.3300 251.000 30.0 101.998 3.340 -999.990 -999.990 1.020 ..P WKT 2010 07 25 23 34 55 31.3200 -97.3300 251.000 122.0 120.085 2.930 -999.990 -999.990 1.201 ..P WKT 2010 07 25 23 39 55 31.3200 -97.3300 251.000 457.0 111.619 2.960 -999.990 -999.990 1.116 ..P WKT 2010 07 25 23 44 55 31.3200 -97.3300 251.000 30.0 114.376 3.730 -999.990 -999.990 1.144 ..P WKT 2010 07 25 23 49 55 31.3200 -97.3300 251.000 122.0 124.250 2.710 -999.990 -999.990 1.242 ..P WKT 2010 07 26 00 09 55 31.3200 -97.3300 251.000 457.0 120.990 2.330 -999.990 -999.990 1.210 ..P WKT 2010 07 26 00 10 25 31.3200 -97.3300 251.000 457.0 116.029 2.400 -999.990 -999.990 1.160 ..P WKT 2010 07 26 00 10 55 31.3200 -97.3300 251.000 457.0 114.901 3.570 -999.990 -999.990 1.149 ..P WKT 2010 07 26 00 11 25 31.3200 -97.3300 251.000 457.0 117.058 3.540 -999.990 -999.990 1.171 ..P WKT 2010 07 26 00 11 55 31.3200 -97.3300 251.000 457.0 122.499 2.020 -999.990 -999.990 1.225 ..P WKT 2010 07 26 00 12 25 31.3200 -97.3300 251.000 457.0 118.086 2.960 -999.990 -999.990 1.181 ..P WKT 2010 07 26 00 12 55 31.3200 -97.3300 251.000 457.0 115.589 1.820 -999.990 -999.990 1.156 ..P WKT 2010 07 26 00 13 25 31.3200 -97.3300 251.000 457.0 122.399 1.910 -999.990 -999.990 1.224 ..P WKT 2010 07 26 00 13 55 31.3200 -97.3300 251.000 457.0 113.058 1.810 -999.990 -999.990 1.131 ..P WKT 2010 07 26 00 14 25 31.3200 -97.3300 251.000 457.0 116.584 1.870 -999.990 -999.990 1.166 ..P WKT 2010 07 26 00 14 55 31.3200 -97.3300 251.000 457.0 117.646 2.670 -999.990 -999.990 1.176 ..P WKT 2010 07 26 00 19 55 31.3200 -97.3300 251.000 30.0 115.122 2.260 -999.990 -999.990 1.151 ..P WKT 2010 07 26 00 24 55 31.3200 -97.3300 251.000 122.0 121.085 4.130 -999.990 -999.990 1.211 ..P WKT 2010 07 26 00 29 55 31.3200 -97.3300 251.000 457.0 119.657 2.490 -999.990 -999.990 1.197 ..P WKT 2010 07 26 00 34 55 31.3200 -97.3300 251.000 30.0 114.669 2.280 -999.990 -999.990 1.147 ..P WKT 2010 07 26 00 39 55 31.3200 -97.3300 251.000 122.0 125.561 2.770 -999.990 -999.990 1.256 ..P WKT 2010 07 26 00 44 55 31.3200 -97.3300 251.000 457.0 113.454 2.520 -999.990 -999.990 1.135 ..P WKT 2010 07 26 00 54 55 31.3200 -97.3300 251.000 30.0 116.701 2.480 -999.990 -999.990 1.167 ..P WKT 2010 07 26 00 59 55 31.3200 -97.3300 251.000 122.0 116.174 4.360 -999.990 -999.990 1.162 ..P WKT 2010 07 26 01 04 55 31.3200 -97.3300 251.000 457.0 115.647 3.270 -999.990 -999.990 1.156 ..P WKT 2010 07 26 01 09 55 31.3200 -97.3300 251.000 30.0 120.324 3.060 -999.990 -999.990 1.203 ..P WKT 2010 07 26 01 14 55 31.3200 -97.3300 251.000 122.0 117.059 3.450 -999.990 -999.990 1.171 ..P WKT 2010 07 26 01 19 55 31.3200 -97.3300 251.000 457.0 113.107 3.640 -999.990 -999.990 1.131 ..P WKT 2010 07 26 01 29 55 31.3200 -97.3300 251.000 30.0 121.015 3.530 -999.990 -999.990 1.210 ..P WKT 2010 07 26 01 34 55 31.3200 -97.3300 251.000 122.0 123.286 3.430 -999.990 -999.990 1.233 ..P WKT 2010 07 26 01 39 55 31.3200 -97.3300 251.000 457.0 123.365 3.760 -999.990 -999.990 1.234 ..P WKT 2010 07 26 01 44 55 31.3200 -97.3300 251.000 30.0 116.596 3.220 -999.990 -999.990 1.166 ..P WKT 2010 07 26 01 49 55 31.3200 -97.3300 251.000 122.0 125.443 3.020 -999.990 -999.990 1.254 ..P WKT 2010 07 26 01 54 55 31.3200 -97.3300 251.000 457.0 115.796 3.770 -999.990 -999.990 1.158 ..P WKT 2010 07 26 02 04 55 31.3200 -97.3300 251.000 30.0 119.243 3.810 -999.990 -999.990 1.192 ..P WKT 2010 07 26 02 09 55 31.3200 -97.3300 251.000 122.0 121.789 2.860 -999.990 -999.990 1.218 ..P WKT 2010 07 26 02 14 55 31.3200 -97.3300 251.000 457.0 115.702 4.060 -999.990 -999.990 1.157 ..P WKT 2010 07 26 02 19 55 31.3200 -97.3300 251.000 30.0 115.645 3.240 -999.990 -999.990 1.156 ..P WKT 2010 07 26 02 24 55 31.3200 -97.3300 251.000 122.0 126.550 3.750 -999.990 -999.990 1.266 ..P WKT 2010 07 26 02 29 55 31.3200 -97.3300 251.000 457.0 116.626 4.190 -999.990 -999.990 1.166 ..P WKT 2010 07 26 02 39 55 31.3200 -97.3300 251.000 30.0 123.696 4.670 -999.990 -999.990 1.237 ..P WKT 2010 07 26 02 44 55 31.3200 -97.3300 251.000 122.0 124.109 3.820 -999.990 -999.990 1.241 ..P WKT 2010 07 26 02 49 55 31.3200 -97.3300 251.000 457.0 112.460 3.790 -999.990 -999.990 1.125 ..P WKT 2010 07 26 02 54 55 31.3200 -97.3300 251.000 30.0 117.121 4.160 -999.990 -999.990 1.171 ..P WKT 2010 07 26 02 59 55 31.3200 -97.3300 251.000 122.0 129.322 3.480 -999.990 -999.990 1.293 ..P WKT 2010 07 26 03 04 55 31.3200 -97.3300 251.000 457.0 118.220 4.090 -999.990 -999.990 1.182 ..P WKT 2010 07 26 03 14 55 31.3200 -97.3300 251.000 30.0 116.871 3.040 -999.990 -999.990 1.169 ..P WKT 2010 07 26 03 19 55 31.3200 -97.3300 251.000 122.0 123.473 3.160 -999.990 -999.990 1.235 ..P WKT 2010 07 26 03 24 55 31.3200 -97.3300 251.000 457.0 120.204 3.110 -999.990 -999.990 1.202 ..P WKT 2010 07 26 03 29 55 31.3200 -97.3300 251.000 30.0 115.288 3.920 -999.990 -999.990 1.153 ..P WKT 2010 07 26 03 34 55 31.3200 -97.3300 251.000 122.0 113.664 2.700 -999.990 -999.990 1.137 ..P WKT 2010 07 26 03 39 55 31.3200 -97.3300 251.000 457.0 119.444 4.980 -999.990 -999.990 1.194 ..P WKT 2010 07 26 03 49 55 31.3200 -97.3300 251.000 30.0 115.430 3.940 -999.990 -999.990 1.154 ..P WKT 2010 07 26 03 54 55 31.3200 -97.3300 251.000 122.0 120.447 2.600 -999.990 -999.990 1.204 ..P WKT 2010 07 26 03 59 55 31.3200 -97.3300 251.000 457.0 113.121 3.610 -999.990 -999.990 1.131 ..P WKT 2010 07 26 04 04 55 31.3200 -97.3300 251.000 30.0 111.829 4.520 -999.990 -999.990 1.118 ..P WKT 2010 07 26 04 09 55 31.3200 -97.3300 251.000 122.0 122.332 2.790 -999.990 -999.990 1.223 ..P WKT 2010 07 26 04 14 55 31.3200 -97.3300 251.000 457.0 118.297 2.890 -999.990 -999.990 1.183 ..P WKT 2010 07 26 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 07 26 04 29 55 31.3200 -97.3300 251.000 122.0 125.866 2.930 -999.990 -999.990 1.259 ..P WKT 2010 07 26 04 34 55 31.3200 -97.3300 251.000 457.0 127.553 3.050 -999.990 -999.990 1.276 ..P WKT 2010 07 26 04 39 55 31.3200 -97.3300 251.000 30.0 116.344 2.670 -999.990 -999.990 1.163 ..P WKT 2010 07 26 04 44 55 31.3200 -97.3300 251.000 122.0 120.226 2.940 -999.990 -999.990 1.202 ..P WKT 2010 07 26 04 49 55 31.3200 -97.3300 251.000 457.0 121.913 2.410 -999.990 -999.990 1.219 ..P WKT 2010 07 26 05 04 55 31.3200 -97.3300 251.000 30.0 111.287 3.280 -999.990 -999.990 1.113 ..P WKT 2010 07 26 05 09 55 31.3200 -97.3300 251.000 122.0 120.775 3.620 -999.990 -999.990 1.208 ..P WKT 2010 07 26 05 14 55 31.3200 -97.3300 251.000 457.0 117.362 2.870 -999.990 -999.990 1.174 ..P WKT 2010 07 26 05 19 55 31.3200 -97.3300 251.000 30.0 117.380 2.710 -999.990 -999.990 1.174 ..P WKT 2010 07 26 05 24 55 31.3200 -97.3300 251.000 122.0 116.713 2.680 -999.990 -999.990 1.167 ..P WKT 2010 07 26 05 29 55 31.3200 -97.3300 251.000 457.0 112.888 3.790 -999.990 -999.990 1.129 ..P WKT 2010 07 26 05 39 55 31.3200 -97.3300 251.000 30.0 104.239 2.990 -999.990 -999.990 1.042 ..P WKT 2010 07 26 05 44 55 31.3200 -97.3300 251.000 122.0 115.614 3.550 -999.990 -999.990 1.156 ..P WKT 2010 07 26 05 49 55 31.3200 -97.3300 251.000 457.0 115.459 5.550 -999.990 -999.990 1.155 ..P WKT 2010 07 26 05 54 55 31.3200 -97.3300 251.000 30.0 104.731 3.400 -999.990 -999.990 1.047 ..P WKT 2010 07 26 05 59 55 31.3200 -97.3300 251.000 122.0 113.225 2.960 -999.990 -999.990 1.132 ..P WKT 2010 07 26 06 04 55 31.3200 -97.3300 251.000 457.0 113.068 3.330 -999.990 -999.990 1.131 ..P WKT 2010 07 26 06 14 55 31.3200 -97.3300 251.000 30.0 106.185 2.760 -999.990 -999.990 1.062 ..P WKT 2010 07 26 06 19 55 31.3200 -97.3300 251.000 122.0 118.270 2.820 -999.990 -999.990 1.183 ..P WKT 2010 07 26 06 24 55 31.3200 -97.3300 251.000 457.0 119.508 3.040 -999.990 -999.990 1.195 ..P WKT 2010 07 26 06 29 55 31.3200 -97.3300 251.000 30.0 105.775 3.200 -999.990 -999.990 1.058 ..P WKT 2010 07 26 06 34 55 31.3200 -97.3300 251.000 122.0 120.610 3.250 -999.990 -999.990 1.206 ..P WKT 2010 07 26 06 39 55 31.3200 -97.3300 251.000 457.0 125.143 2.570 -999.990 -999.990 1.251 ..P WKT 2010 07 26 06 49 55 31.3200 -97.3300 251.000 30.0 119.730 2.710 -999.990 -999.990 1.197 ..P WKT 2010 07 26 06 54 55 31.3200 -97.3300 251.000 122.0 117.063 4.240 -999.990 -999.990 1.171 ..P WKT 2010 07 26 06 59 55 31.3200 -97.3300 251.000 457.0 115.632 3.960 -999.990 -999.990 1.156 ..P WKT 2010 07 26 07 04 55 31.3200 -97.3300 251.000 30.0 109.942 4.820 -999.990 -999.990 1.099 ..P WKT 2010 07 26 07 09 55 31.3200 -97.3300 251.000 122.0 119.088 4.110 -999.990 -999.990 1.191 ..P WKT 2010 07 26 07 14 55 31.3200 -97.3300 251.000 457.0 113.535 3.200 -999.990 -999.990 1.135 ..P WKT 2010 07 26 07 24 55 31.3200 -97.3300 251.000 30.0 109.552 3.630 -999.990 -999.990 1.096 ..P WKT 2010 07 26 07 29 55 31.3200 -97.3300 251.000 122.0 110.299 3.960 -999.990 -999.990 1.103 ..P WKT 2010 07 26 07 34 55 31.3200 -97.3300 251.000 457.0 111.871 4.400 -999.990 -999.990 1.119 ..P WKT 2010 07 26 07 39 55 31.3200 -97.3300 251.000 30.0 109.319 4.100 -999.990 -999.990 1.093 ..P WKT 2010 07 26 07 44 55 31.3200 -97.3300 251.000 122.0 120.236 3.670 -999.990 -999.990 1.202 ..P WKT 2010 07 26 07 49 55 31.3200 -97.3300 251.000 457.0 121.533 2.640 -999.990 -999.990 1.215 ..P WKT 2010 07 26 07 59 55 31.3200 -97.3300 251.000 30.0 116.627 2.440 -999.990 -999.990 1.166 ..P WKT 2010 07 26 08 04 55 31.3200 -97.3300 251.000 122.0 123.069 4.090 -999.990 -999.990 1.231 ..P WKT 2010 07 26 08 09 55 31.3200 -97.3300 251.000 457.0 119.340 4.180 -999.990 -999.990 1.193 ..P WKT 2010 07 26 08 14 55 31.3200 -97.3300 251.000 30.0 108.736 3.450 -999.990 -999.990 1.087 ..P WKT 2010 07 26 08 19 55 31.3200 -97.3300 251.000 122.0 107.480 2.520 -999.990 -999.990 1.075 ..P WKT 2010 07 26 08 24 55 31.3200 -97.3300 251.000 457.0 115.847 1.990 -999.990 -999.990 1.158 ..P WKT 2010 07 26 08 34 55 31.3200 -97.3300 251.000 30.0 103.456 1.970 -999.990 -999.990 1.035 ..P WKT 2010 07 26 08 39 55 31.3200 -97.3300 251.000 122.0 113.494 3.920 -999.990 -999.990 1.135 ..P WKT 2010 07 26 08 44 55 31.3200 -97.3300 251.000 457.0 119.408 2.660 -999.990 -999.990 1.194 ..P WKT 2010 07 26 08 49 55 31.3200 -97.3300 251.000 30.0 96.170 2.110 -999.990 -999.990 0.962 ..P WKT 2010 07 26 08 54 55 31.3200 -97.3300 251.000 122.0 109.234 1.960 -999.990 -999.990 1.092 ..P WKT 2010 07 26 08 59 55 31.3200 -97.3300 251.000 457.0 120.650 1.840 -999.990 -999.990 1.207 ..P WKT 2010 07 26 09 09 55 31.3200 -97.3300 251.000 30.0 99.413 2.140 -999.990 -999.990 0.994 ..P WKT 2010 07 26 09 14 55 31.3200 -97.3300 251.000 122.0 109.120 3.200 -999.990 -999.990 1.091 ..P WKT 2010 07 26 09 19 55 31.3200 -97.3300 251.000 457.0 116.764 3.030 -999.990 -999.990 1.168 ..P WKT 2010 07 26 09 24 55 31.3200 -97.3300 251.000 30.0 96.761 2.710 -999.990 -999.990 0.968 ..P WKT 2010 07 26 09 29 55 31.3200 -97.3300 251.000 122.0 115.411 4.850 -999.990 -999.990 1.154 ..P WKT 2010 07 26 09 34 55 31.3200 -97.3300 251.000 457.0 118.242 2.810 -999.990 -999.990 1.182 ..P WKT 2010 07 26 09 44 55 31.3200 -97.3300 251.000 30.0 93.323 2.980 -999.990 -999.990 0.933 ..P WKT 2010 07 26 09 49 55 31.3200 -97.3300 251.000 122.0 112.212 3.050 -999.990 -999.990 1.122 ..P WKT 2010 07 26 09 54 55 31.3200 -97.3300 251.000 457.0 117.206 3.160 -999.990 -999.990 1.172 ..P WKT 2010 07 26 09 59 55 31.3200 -97.3300 251.000 30.0 93.717 3.930 -999.990 -999.990 0.937 ..P WKT 2010 07 26 10 04 55 31.3200 -97.3300 251.000 122.0 106.141 4.250 -999.990 -999.990 1.061 ..P WKT 2010 07 26 10 09 55 31.3200 -97.3300 251.000 457.0 123.933 2.920 -999.990 -999.990 1.239 ..P WKT 2010 07 26 10 19 55 31.3200 -97.3300 251.000 30.0 102.958 2.150 -999.990 -999.990 1.030 ..P WKT 2010 07 26 10 24 55 31.3200 -97.3300 251.000 122.0 116.073 3.070 -999.990 -999.990 1.161 ..P WKT 2010 07 26 10 29 55 31.3200 -97.3300 251.000 457.0 122.169 5.290 -999.990 -999.990 1.222 ..P WKT 2010 07 26 10 34 55 31.3200 -97.3300 251.000 30.0 103.353 4.720 -999.990 -999.990 1.034 ..P WKT 2010 07 26 10 39 55 31.3200 -97.3300 251.000 122.0 123.352 3.560 -999.990 -999.990 1.234 ..P WKT 2010 07 26 10 44 55 31.3200 -97.3300 251.000 457.0 109.352 4.220 -999.990 -999.990 1.094 ..P WKT 2010 07 26 10 54 55 31.3200 -97.3300 251.000 30.0 115.490 2.510 -999.990 -999.990 1.155 ..P WKT 2010 07 26 10 59 55 31.3200 -97.3300 251.000 122.0 118.008 2.940 -999.990 -999.990 1.180 ..P WKT 2010 07 26 11 04 55 31.3200 -97.3300 251.000 457.0 109.237 2.720 -999.990 -999.990 1.092 ..P WKT 2010 07 26 11 09 55 31.3200 -97.3300 251.000 30.0 108.727 2.850 -999.990 -999.990 1.087 ..P WKT 2010 07 26 11 14 55 31.3200 -97.3300 251.000 122.0 116.202 2.820 -999.990 -999.990 1.162 ..P WKT 2010 07 26 11 19 55 31.3200 -97.3300 251.000 457.0 119.548 3.000 -999.990 -999.990 1.195 ..P WKT 2010 07 26 11 29 55 31.3200 -97.3300 251.000 30.0 108.642 2.940 -999.990 -999.990 1.086 ..P WKT 2010 07 26 11 34 55 31.3200 -97.3300 251.000 122.0 124.962 3.650 -999.990 -999.990 1.250 ..P WKT 2010 07 26 11 39 55 31.3200 -97.3300 251.000 457.0 125.859 2.910 -999.990 -999.990 1.259 ..P WKT 2010 07 26 11 44 55 31.3200 -97.3300 251.000 30.0 111.605 3.290 -999.990 -999.990 1.116 ..P WKT 2010 07 26 11 49 55 31.3200 -97.3300 251.000 122.0 112.502 3.390 -999.990 -999.990 1.125 ..P WKT 2010 07 26 12 09 55 31.3200 -97.3300 251.000 457.0 120.698 3.430 -999.990 -999.990 1.207 ..P WKT 2010 07 26 12 10 25 31.3200 -97.3300 251.000 457.0 112.653 1.870 -999.990 -999.990 1.127 ..P WKT 2010 07 26 12 10 55 31.3200 -97.3300 251.000 457.0 115.629 2.080 -999.990 -999.990 1.156 ..P WKT 2010 07 26 12 11 25 31.3200 -97.3300 251.000 457.0 113.920 2.470 -999.990 -999.990 1.139 ..P WKT 2010 07 26 12 11 55 31.3200 -97.3300 251.000 457.0 112.763 3.220 -999.990 -999.990 1.128 ..P WKT 2010 07 26 12 12 25 31.3200 -97.3300 251.000 457.0 118.769 4.420 -999.990 -999.990 1.188 ..P WKT 2010 07 26 12 12 55 31.3200 -97.3300 251.000 457.0 116.234 3.010 -999.990 -999.990 1.162 ..P WKT 2010 07 26 12 13 25 31.3200 -97.3300 251.000 457.0 119.485 2.560 -999.990 -999.990 1.195 ..P WKT 2010 07 26 12 13 55 31.3200 -97.3300 251.000 457.0 116.399 2.420 -999.990 -999.990 1.164 ..P WKT 2010 07 26 12 14 25 31.3200 -97.3300 251.000 457.0 117.722 2.000 -999.990 -999.990 1.177 ..P WKT 2010 07 26 12 14 55 31.3200 -97.3300 251.000 457.0 121.524 2.910 -999.990 -999.990 1.215 ..P WKT 2010 07 26 12 19 55 31.3200 -97.3300 251.000 30.0 107.747 3.050 -999.990 -999.990 1.077 ..P WKT 2010 07 26 12 24 55 31.3200 -97.3300 251.000 122.0 115.185 2.550 -999.990 -999.990 1.152 ..P WKT 2010 07 26 12 29 55 31.3200 -97.3300 251.000 457.0 114.358 3.170 -999.990 -999.990 1.144 ..P WKT 2010 07 26 12 34 55 31.3200 -97.3300 251.000 30.0 101.958 2.120 -999.990 -999.990 1.020 ..P WKT 2010 07 26 12 39 55 31.3200 -97.3300 251.000 122.0 114.907 2.090 -999.990 -999.990 1.149 ..P WKT 2010 07 26 12 44 55 31.3200 -97.3300 251.000 457.0 114.355 2.660 -999.990 -999.990 1.144 ..P WKT 2010 07 26 12 54 55 31.3200 -97.3300 251.000 30.0 107.130 1.820 -999.990 -999.990 1.071 ..P WKT 2010 07 26 12 59 55 31.3200 -97.3300 251.000 122.0 118.920 3.350 -999.990 -999.990 1.189 ..P WKT 2010 07 26 13 04 55 31.3200 -97.3300 251.000 457.0 107.561 4.030 -999.990 -999.990 1.076 ..P WKT 2010 07 26 13 09 55 31.3200 -97.3300 251.000 30.0 111.083 3.560 -999.990 -999.990 1.111 ..P WKT 2010 07 26 13 14 55 31.3200 -97.3300 251.000 122.0 112.677 4.530 -999.990 -999.990 1.127 ..P WKT 2010 07 26 13 19 55 31.3200 -97.3300 251.000 457.0 115.373 2.680 -999.990 -999.990 1.154 ..P WKT 2010 07 26 13 29 55 31.3200 -97.3300 251.000 30.0 112.832 3.000 -999.990 -999.990 1.128 ..P WKT 2010 07 26 13 34 55 31.3200 -97.3300 251.000 122.0 124.821 2.920 -999.990 -999.990 1.248 ..P WKT 2010 07 26 13 39 55 31.3200 -97.3300 251.000 457.0 120.824 2.640 -999.990 -999.990 1.208 ..P WKT 2010 07 26 13 44 55 31.3200 -97.3300 251.000 30.0 119.582 4.450 -999.990 -999.990 1.196 ..P WKT 2010 07 26 13 49 55 31.3200 -97.3300 251.000 122.0 128.127 4.740 -999.990 -999.990 1.281 ..P WKT 2010 07 26 13 54 55 31.3200 -97.3300 251.000 457.0 119.719 2.820 -999.990 -999.990 1.197 ..P WKT 2010 07 26 14 04 55 31.3200 -97.3300 251.000 30.0 115.622 3.130 -999.990 -999.990 1.156 ..P WKT 2010 07 26 14 09 55 31.3200 -97.3300 251.000 122.0 125.447 4.230 -999.990 -999.990 1.254 ..P WKT 2010 07 26 14 14 55 31.3200 -97.3300 251.000 457.0 122.316 3.260 -999.990 -999.990 1.223 ..P WKT 2010 07 26 14 19 55 31.3200 -97.3300 251.000 30.0 116.565 3.170 -999.990 -999.990 1.166 ..P WKT 2010 07 26 14 24 55 31.3200 -97.3300 251.000 122.0 119.223 3.910 -999.990 -999.990 1.192 ..P WKT 2010 07 26 14 29 55 31.3200 -97.3300 251.000 457.0 122.433 3.620 -999.990 -999.990 1.224 ..P WKT 2010 07 26 14 39 55 31.3200 -97.3300 251.000 30.0 118.512 3.710 -999.990 -999.990 1.185 ..P WKT 2010 07 26 14 44 55 31.3200 -97.3300 251.000 122.0 128.202 3.830 -999.990 -999.990 1.282 ..P WKT 2010 07 26 14 49 55 31.3200 -97.3300 251.000 457.0 124.931 2.890 -999.990 -999.990 1.249 ..P WKT 2010 07 26 14 54 55 31.3200 -97.3300 251.000 30.0 118.903 3.950 -999.990 -999.990 1.189 ..P WKT 2010 07 26 14 59 55 31.3200 -97.3300 251.000 122.0 122.527 2.630 -999.990 -999.990 1.225 ..P WKT 2010 07 26 15 04 55 31.3200 -97.3300 251.000 457.0 128.634 3.920 -999.990 -999.990 1.286 ..P WKT 2010 07 26 15 14 55 31.3200 -97.3300 251.000 30.0 130.839 2.580 -999.990 -999.990 1.308 ..P WKT 2010 07 26 15 19 55 31.3200 -97.3300 251.000 122.0 127.490 2.610 -999.990 -999.990 1.275 ..P WKT 2010 07 26 15 24 55 31.3200 -97.3300 251.000 457.0 125.243 2.780 -999.990 -999.990 1.252 ..P WKT 2010 07 26 15 29 55 31.3200 -97.3300 251.000 30.0 133.478 3.000 -999.990 -999.990 1.335 ..P WKT 2010 07 26 15 34 55 31.3200 -97.3300 251.000 122.0 136.197 3.260 -999.990 -999.990 1.362 ..P WKT 2010 07 26 15 39 55 31.3200 -97.3300 251.000 457.0 132.295 3.670 -999.990 -999.990 1.323 ..P WKT 2010 07 26 15 49 55 31.3200 -97.3300 251.000 30.0 130.009 3.590 -999.990 -999.990 1.300 ..P WKT 2010 07 26 15 54 55 31.3200 -97.3300 251.000 122.0 140.453 3.130 -999.990 -999.990 1.405 ..P WKT 2010 07 26 15 59 55 31.3200 -97.3300 251.000 457.0 118.342 2.610 -999.990 -999.990 1.183 ..P WKT 2010 07 26 16 04 55 31.3200 -97.3300 251.000 30.0 125.475 2.380 -999.990 -999.990 1.255 ..P WKT 2010 07 26 16 09 55 31.3200 -97.3300 251.000 122.0 138.679 2.660 -999.990 -999.990 1.387 ..P WKT 2010 07 26 16 14 55 31.3200 -97.3300 251.000 457.0 138.914 4.000 -999.990 -999.990 1.389 ..P WKT 2010 07 26 16 24 55 31.3200 -97.3300 251.000 30.0 133.081 3.180 -999.990 -999.990 1.331 ..P WKT 2010 07 26 16 29 55 31.3200 -97.3300 251.000 122.0 136.116 3.020 -999.990 -999.990 1.361 ..P WKT 2010 07 26 16 34 55 31.3200 -97.3300 251.000 457.0 129.217 3.620 -999.990 -999.990 1.292 ..P WKT 2010 07 26 16 39 55 31.3200 -97.3300 251.000 30.0 135.839 3.180 -999.990 -999.990 1.358 ..P WKT 2010 07 26 16 44 55 31.3200 -97.3300 251.000 122.0 140.530 4.370 -999.990 -999.990 1.405 ..P WKT 2010 07 26 16 49 55 31.3200 -97.3300 251.000 457.0 133.080 4.550 -999.990 -999.990 1.331 ..P WKT 2010 07 26 17 04 55 31.3200 -97.3300 251.000 30.0 122.936 3.790 -999.990 -999.990 1.229 ..P WKT 2010 07 26 17 09 55 31.3200 -97.3300 251.000 122.0 145.326 3.790 -999.990 -999.990 1.453 ..P WKT 2010 07 26 17 14 55 31.3200 -97.3300 251.000 457.0 137.908 3.020 -999.990 -999.990 1.379 ..P WKT 2010 07 26 17 19 55 31.3200 -97.3300 251.000 30.0 133.388 2.660 -999.990 -999.990 1.334 ..P WKT 2010 07 26 17 24 55 31.3200 -97.3300 251.000 122.0 143.221 2.930 -999.990 -999.990 1.432 ..P WKT 2010 07 26 17 29 55 31.3200 -97.3300 251.000 457.0 136.078 3.000 -999.990 -999.990 1.361 ..P WKT 2010 07 26 17 39 55 31.3200 -97.3300 251.000 30.0 136.231 2.710 -999.990 -999.990 1.362 ..P WKT 2010 07 26 17 44 55 31.3200 -97.3300 251.000 122.0 141.180 2.650 -999.990 -999.990 1.412 ..P WKT 2010 07 26 17 49 55 31.3200 -97.3300 251.000 457.0 137.709 3.630 -999.990 -999.990 1.377 ..P WKT 2010 07 26 17 54 55 31.3200 -97.3300 251.000 30.0 133.549 2.540 -999.990 -999.990 1.335 ..P WKT 2010 07 26 17 59 55 31.3200 -97.3300 251.000 122.0 142.501 2.870 -999.990 -999.990 1.425 ..P WKT 2010 07 26 18 04 55 31.3200 -97.3300 251.000 457.0 138.064 3.500 -999.990 -999.990 1.381 ..P WKT 2010 07 26 18 14 55 31.3200 -97.3300 251.000 30.0 131.300 3.230 -999.990 -999.990 1.313 ..P WKT 2010 07 26 18 19 55 31.3200 -97.3300 251.000 122.0 146.504 2.460 -999.990 -999.990 1.465 ..P WKT 2010 07 26 18 24 55 31.3200 -97.3300 251.000 457.0 138.241 2.810 -999.990 -999.990 1.382 ..P WKT 2010 07 26 18 29 55 31.3200 -97.3300 251.000 30.0 140.746 2.380 -999.990 -999.990 1.407 ..P WKT 2010 07 26 18 34 55 31.3200 -97.3300 251.000 122.0 150.982 2.250 -999.990 -999.990 1.510 ..P WKT 2010 07 26 18 39 55 31.3200 -97.3300 251.000 457.0 146.170 2.970 -999.990 -999.990 1.462 ..P WKT 2010 07 26 18 49 55 31.3200 -97.3300 251.000 30.0 138.497 4.140 -999.990 -999.990 1.385 ..P WKT 2010 07 26 18 54 55 31.3200 -97.3300 251.000 122.0 150.687 2.510 -999.990 -999.990 1.507 ..P WKT 2010 07 26 18 59 55 31.3200 -97.3300 251.000 457.0 146.170 2.850 -999.990 -999.990 1.462 ..P WKT 2010 07 26 19 04 55 31.3200 -97.3300 251.000 30.0 145.796 2.610 -999.990 -999.990 1.458 ..P WKT 2010 07 26 19 09 55 31.3200 -97.3300 251.000 122.0 152.049 2.800 -999.990 -999.990 1.520 ..P WKT 2010 07 26 19 14 55 31.3200 -97.3300 251.000 457.0 142.560 3.400 -999.990 -999.990 1.426 ..P WKT 2010 07 26 19 24 55 31.3200 -97.3300 251.000 30.0 153.431 3.710 -999.990 -999.990 1.534 ..P WKT 2010 07 26 19 29 55 31.3200 -97.3300 251.000 122.0 167.164 3.100 -999.990 -999.990 1.672 ..P WKT 2010 07 26 19 34 55 31.3200 -97.3300 251.000 457.0 166.532 2.940 -999.990 -999.990 1.665 ..P WKT 2010 07 26 19 39 55 31.3200 -97.3300 251.000 30.0 165.902 2.830 -999.990 -999.990 1.659 ..P WKT 2010 07 26 19 44 55 31.3200 -97.3300 251.000 122.0 170.796 2.890 -999.990 -999.990 1.708 ..P WKT 2010 07 26 19 49 55 31.3200 -97.3300 251.000 457.0 165.193 3.080 -999.990 -999.990 1.652 ..P WKT 2010 07 26 19 59 55 31.3200 -97.3300 251.000 30.0 151.696 2.830 -999.990 -999.990 1.517 ..P WKT 2010 07 26 20 04 55 31.3200 -97.3300 251.000 122.0 152.368 2.730 -999.990 -999.990 1.524 ..P WKT 2010 07 26 20 09 55 31.3200 -97.3300 251.000 457.0 149.447 2.360 -999.990 -999.990 1.494 ..P WKT 2010 07 26 20 14 55 31.3200 -97.3300 251.000 30.0 153.157 2.890 -999.990 -999.990 1.532 ..P WKT 2010 07 26 20 19 55 31.3200 -97.3300 251.000 122.0 149.960 2.740 -999.990 -999.990 1.500 ..P WKT 2010 07 26 20 24 55 31.3200 -97.3300 251.000 457.0 145.382 5.530 -999.990 -999.990 1.454 ..P WKT 2010 07 26 20 34 55 31.3200 -97.3300 251.000 30.0 140.784 2.900 -999.990 -999.990 1.408 ..P WKT 2010 07 26 20 39 55 31.3200 -97.3300 251.000 122.0 162.041 2.540 -999.990 -999.990 1.620 ..P WKT 2010 07 26 20 44 55 31.3200 -97.3300 251.000 457.0 128.999 2.550 -999.990 -999.990 1.290 ..P WKT 2010 07 26 20 49 55 31.3200 -97.3300 251.000 30.0 147.633 2.370 -999.990 -999.990 1.476 ..P WKT 2010 07 26 20 54 55 31.3200 -97.3300 251.000 122.0 142.501 3.540 -999.990 -999.990 1.425 ..P WKT 2010 07 26 20 59 55 31.3200 -97.3300 251.000 457.0 123.827 2.950 -999.990 -999.990 1.238 ..P WKT 2010 07 26 21 09 55 31.3200 -97.3300 251.000 30.0 141.750 2.200 -999.990 -999.990 1.417 ..P WKT 2010 07 26 21 14 55 31.3200 -97.3300 251.000 122.0 150.713 3.000 -999.990 -999.990 1.507 ..P WKT 2010 07 26 21 19 55 31.3200 -97.3300 251.000 457.0 126.647 3.250 -999.990 -999.990 1.266 ..P WKT 2010 07 26 21 24 55 31.3200 -97.3300 251.000 30.0 128.009 3.140 -999.990 -999.990 1.280 ..P WKT 2010 07 26 21 29 55 31.3200 -97.3300 251.000 122.0 135.590 3.490 -999.990 -999.990 1.356 ..P WKT 2010 07 26 21 34 55 31.3200 -97.3300 251.000 457.0 139.440 2.560 -999.990 -999.990 1.394 ..P WKT 2010 07 26 21 44 55 31.3200 -97.3300 251.000 30.0 141.533 2.510 -999.990 -999.990 1.415 ..P WKT 2010 07 26 21 49 55 31.3200 -97.3300 251.000 122.0 144.475 2.490 -999.990 -999.990 1.445 ..P WKT 2010 07 26 21 54 55 31.3200 -97.3300 251.000 457.0 134.700 2.850 -999.990 -999.990 1.347 ..P WKT 2010 07 26 21 59 55 31.3200 -97.3300 251.000 30.0 137.919 2.530 -999.990 -999.990 1.379 ..P WKT 2010 07 26 22 04 55 31.3200 -97.3300 251.000 122.0 139.756 2.500 -999.990 -999.990 1.398 ..P WKT 2010 07 26 22 09 55 31.3200 -97.3300 251.000 457.0 132.883 3.040 -999.990 -999.990 1.329 ..P WKT 2010 07 26 22 19 55 31.3200 -97.3300 251.000 30.0 128.063 2.990 -999.990 -999.990 1.281 ..P WKT 2010 07 26 22 24 55 31.3200 -97.3300 251.000 122.0 141.869 3.230 -999.990 -999.990 1.419 ..P WKT 2010 07 26 22 29 55 31.3200 -97.3300 251.000 457.0 129.267 3.020 -999.990 -999.990 1.293 ..P WKT 2010 07 26 22 34 55 31.3200 -97.3300 251.000 30.0 127.449 3.040 -999.990 -999.990 1.274 ..P WKT 2010 07 26 22 39 55 31.3200 -97.3300 251.000 122.0 138.352 3.230 -999.990 -999.990 1.384 ..P WKT 2010 07 26 22 44 55 31.3200 -97.3300 251.000 457.0 125.059 3.640 -999.990 -999.990 1.251 ..P WKT 2010 07 26 22 54 55 31.3200 -97.3300 251.000 30.0 122.272 4.010 -999.990 -999.990 1.223 ..P WKT 2010 07 26 22 59 55 31.3200 -97.3300 251.000 122.0 125.314 2.570 -999.990 -999.990 1.253 ..P WKT 2010 07 26 23 04 55 31.3200 -97.3300 251.000 457.0 144.120 3.240 -999.990 -999.990 1.441 ..P WKT 2010 07 26 23 09 55 31.3200 -97.3300 251.000 30.0 143.014 2.740 -999.990 -999.990 1.430 ..P WKT 2010 07 26 23 14 55 31.3200 -97.3300 251.000 122.0 147.992 4.430 -999.990 -999.990 1.480 ..P WKT 2010 07 26 23 19 55 31.3200 -97.3300 251.000 457.0 131.120 3.620 -999.990 -999.990 1.311 ..P WKT 2010 07 26 23 29 55 31.3200 -97.3300 251.000 30.0 127.904 3.020 -999.990 -999.990 1.279 ..P WKT 2010 07 26 23 34 55 31.3200 -97.3300 251.000 122.0 125.794 4.350 -999.990 -999.990 1.258 ..P WKT 2010 07 26 23 39 55 31.3200 -97.3300 251.000 457.0 131.983 3.020 -999.990 -999.990 1.320 ..P WKT 2010 07 26 23 44 55 31.3200 -97.3300 251.000 30.0 124.065 5.820 -999.990 -999.990 1.241 ..P WKT 2010 07 26 23 49 55 31.3200 -97.3300 251.000 122.0 131.637 3.350 -999.990 -999.990 1.316 ..P WKT 2010 07 27 00 09 55 31.3200 -97.3300 251.000 457.0 115.190 4.260 -999.990 -999.990 1.152 ..P WKT 2010 07 27 00 10 25 31.3200 -97.3300 251.000 457.0 109.889 3.950 -999.990 -999.990 1.099 ..P WKT 2010 07 27 00 10 55 31.3200 -97.3300 251.000 457.0 109.014 3.520 -999.990 -999.990 1.090 ..P WKT 2010 07 27 00 11 25 31.3200 -97.3300 251.000 457.0 109.799 2.870 -999.990 -999.990 1.098 ..P WKT 2010 07 27 00 11 55 31.3200 -97.3300 251.000 457.0 116.392 2.650 -999.990 -999.990 1.164 ..P WKT 2010 07 27 00 12 25 31.3200 -97.3300 251.000 457.0 117.177 2.740 -999.990 -999.990 1.172 ..P WKT 2010 07 27 00 12 55 31.3200 -97.3300 251.000 457.0 116.301 3.610 -999.990 -999.990 1.163 ..P WKT 2010 07 27 00 13 25 31.3200 -97.3300 251.000 457.0 115.426 4.090 -999.990 -999.990 1.154 ..P WKT 2010 07 27 00 13 55 31.3200 -97.3300 251.000 457.0 106.529 3.130 -999.990 -999.990 1.065 ..P WKT 2010 07 27 00 14 25 31.3200 -97.3300 251.000 457.0 108.143 2.980 -999.990 -999.990 1.081 ..P WKT 2010 07 27 00 14 55 31.3200 -97.3300 251.000 457.0 114.737 2.850 -999.990 -999.990 1.147 ..P WKT 2010 07 27 00 19 55 31.3200 -97.3300 251.000 30.0 111.517 2.910 -999.990 -999.990 1.115 ..P WKT 2010 07 27 00 24 55 31.3200 -97.3300 251.000 122.0 109.680 3.180 -999.990 -999.990 1.097 ..P WKT 2010 07 27 00 29 55 31.3200 -97.3300 251.000 457.0 117.801 3.930 -999.990 -999.990 1.178 ..P WKT 2010 07 27 00 34 55 31.3200 -97.3300 251.000 30.0 111.263 4.370 -999.990 -999.990 1.113 ..P WKT 2010 07 27 00 39 55 31.3200 -97.3300 251.000 122.0 110.809 3.170 -999.990 -999.990 1.108 ..P WKT 2010 07 27 00 44 55 31.3200 -97.3300 251.000 457.0 111.185 3.050 -999.990 -999.990 1.112 ..P WKT 2010 07 27 00 54 55 31.3200 -97.3300 251.000 30.0 106.474 3.930 -999.990 -999.990 1.065 ..P WKT 2010 07 27 00 59 55 31.3200 -97.3300 251.000 122.0 108.160 3.720 -999.990 -999.990 1.082 ..P WKT 2010 07 27 01 04 55 31.3200 -97.3300 251.000 457.0 103.211 3.380 -999.990 -999.990 1.032 ..P WKT 2010 07 27 01 09 55 31.3200 -97.3300 251.000 30.0 96.603 3.140 -999.990 -999.990 0.966 ..P WKT 2010 07 27 01 14 55 31.3200 -97.3300 251.000 122.0 106.583 3.920 -999.990 -999.990 1.066 ..P WKT 2010 07 27 01 19 55 31.3200 -97.3300 251.000 457.0 106.057 2.830 -999.990 -999.990 1.061 ..P WKT 2010 07 27 01 29 55 31.3200 -97.3300 251.000 30.0 100.130 3.230 -999.990 -999.990 1.001 ..P WKT 2010 07 27 01 34 55 31.3200 -97.3300 251.000 122.0 100.809 3.500 -999.990 -999.990 1.008 ..P WKT 2010 07 27 01 39 55 31.3200 -97.3300 251.000 457.0 112.543 3.380 -999.990 -999.990 1.125 ..P WKT 2010 07 27 01 44 55 31.3200 -97.3300 251.000 30.0 95.810 2.680 -999.990 -999.990 0.958 ..P WKT 2010 07 27 01 49 55 31.3200 -97.3300 251.000 122.0 99.944 2.990 -999.990 -999.990 0.999 ..P WKT 2010 07 27 01 54 55 31.3200 -97.3300 251.000 457.0 110.019 3.320 -999.990 -999.990 1.100 ..P WKT 2010 07 27 02 04 55 31.3200 -97.3300 251.000 30.0 102.199 5.090 -999.990 -999.990 1.022 ..P WKT 2010 07 27 02 09 55 31.3200 -97.3300 251.000 122.0 107.101 3.670 -999.990 -999.990 1.071 ..P WKT 2010 07 27 02 14 55 31.3200 -97.3300 251.000 457.0 98.050 3.390 -999.990 -999.990 0.981 ..P WKT 2010 07 27 02 19 55 31.3200 -97.3300 251.000 30.0 93.697 2.500 -999.990 -999.990 0.937 ..P WKT 2010 07 27 02 24 55 31.3200 -97.3300 251.000 122.0 92.659 5.100 -999.990 -999.990 0.927 ..P WKT 2010 07 27 02 29 55 31.3200 -97.3300 251.000 457.0 81.261 3.030 -999.990 -999.990 0.813 ..P WKT 2010 07 27 02 39 55 31.3200 -97.3300 251.000 30.0 93.118 2.590 -999.990 -999.990 0.931 ..P WKT 2010 07 27 02 44 55 31.3200 -97.3300 251.000 122.0 91.509 2.560 -999.990 -999.990 0.915 ..P WKT 2010 07 27 02 49 55 31.3200 -97.3300 251.000 457.0 71.255 1.970 -999.990 -999.990 0.713 ..P WKT 2010 07 27 02 54 55 31.3200 -97.3300 251.000 30.0 86.356 2.630 -999.990 -999.990 0.864 ..P WKT 2010 07 27 02 59 55 31.3200 -97.3300 251.000 122.0 94.828 1.670 -999.990 -999.990 0.948 ..P WKT 2010 07 27 03 04 55 31.3200 -97.3300 251.000 457.0 73.473 1.340 -999.990 -999.990 0.735 ..P WKT 2010 07 27 03 14 55 31.3200 -97.3300 251.000 30.0 85.977 1.740 -999.990 -999.990 0.860 ..P WKT 2010 07 27 03 19 55 31.3200 -97.3300 251.000 122.0 86.695 1.910 -999.990 -999.990 0.867 ..P WKT 2010 07 27 03 24 55 31.3200 -97.3300 251.000 457.0 69.466 2.960 -999.990 -999.990 0.695 ..P WKT 2010 07 27 03 29 55 31.3200 -97.3300 251.000 30.0 94.483 2.240 -999.990 -999.990 0.945 ..P WKT 2010 07 27 03 34 55 31.3200 -97.3300 251.000 122.0 87.747 2.980 -999.990 -999.990 0.877 ..P WKT 2010 07 27 03 39 55 31.3200 -97.3300 251.000 457.0 73.004 2.990 -999.990 -999.990 0.730 ..P WKT 2010 07 27 03 49 55 31.3200 -97.3300 251.000 30.0 96.370 2.810 -999.990 -999.990 0.964 ..P WKT 2010 07 27 03 54 55 31.3200 -97.3300 251.000 122.0 97.758 3.500 -999.990 -999.990 0.978 ..P WKT 2010 07 27 03 59 55 31.3200 -97.3300 251.000 457.0 77.616 2.900 -999.990 -999.990 0.776 ..P WKT 2010 07 27 04 04 55 31.3200 -97.3300 251.000 30.0 95.290 2.170 -999.990 -999.990 0.953 ..P WKT 2010 07 27 04 09 55 31.3200 -97.3300 251.000 122.0 78.738 2.780 -999.990 -999.990 0.787 ..P WKT 2010 07 27 04 14 55 31.3200 -97.3300 251.000 457.0 71.019 2.850 -999.990 -999.990 0.710 ..P WKT 2010 07 27 04 24 55 31.3200 -97.3300 251.000 30.0 94.988 2.190 -999.990 -999.990 0.950 ..P WKT 2010 07 27 04 29 55 31.3200 -97.3300 251.000 122.0 88.590 2.460 -999.990 -999.990 0.886 ..P WKT 2010 07 27 04 34 55 31.3200 -97.3300 251.000 457.0 75.846 1.980 -999.990 -999.990 0.758 ..P WKT 2010 07 27 04 39 55 31.3200 -97.3300 251.000 30.0 98.974 2.200 -999.990 -999.990 0.990 ..P WKT 2010 07 27 04 44 55 31.3200 -97.3300 251.000 122.0 98.785 2.470 -999.990 -999.990 0.988 ..P WKT 2010 07 27 04 49 55 31.3200 -97.3300 251.000 457.0 89.215 4.120 -999.990 -999.990 0.892 ..P WKT 2010 07 27 05 04 55 31.3200 -97.3300 251.000 30.0 96.389 3.080 -999.990 -999.990 0.964 ..P WKT 2010 07 27 05 09 55 31.3200 -97.3300 251.000 122.0 91.656 3.770 -999.990 -999.990 0.917 ..P WKT 2010 07 27 05 14 55 31.3200 -97.3300 251.000 457.0 92.578 4.230 -999.990 -999.990 0.926 ..P WKT 2010 07 27 05 19 55 31.3200 -97.3300 251.000 30.0 88.673 2.740 -999.990 -999.990 0.887 ..P WKT 2010 07 27 05 24 55 31.3200 -97.3300 251.000 122.0 93.732 3.690 -999.990 -999.990 0.937 ..P WKT 2010 07 27 05 29 55 31.3200 -97.3300 251.000 457.0 91.896 2.960 -999.990 -999.990 0.919 ..P WKT 2010 07 27 05 39 55 31.3200 -97.3300 251.000 30.0 96.155 4.310 -999.990 -999.990 0.962 ..P WKT 2010 07 27 05 44 55 31.3200 -97.3300 251.000 122.0 96.873 3.230 -999.990 -999.990 0.969 ..P WKT 2010 07 27 05 49 55 31.3200 -97.3300 251.000 457.0 94.280 2.610 -999.990 -999.990 0.943 ..P WKT 2010 07 27 05 54 55 31.3200 -97.3300 251.000 30.0 88.105 3.380 -999.990 -999.990 0.881 ..P WKT 2010 07 27 05 59 55 31.3200 -97.3300 251.000 122.0 95.991 3.040 -999.990 -999.990 0.960 ..P WKT 2010 07 27 06 04 55 31.3200 -97.3300 251.000 457.0 93.951 2.560 -999.990 -999.990 0.940 ..P WKT 2010 07 27 06 14 55 31.3200 -97.3300 251.000 30.0 94.223 2.560 -999.990 -999.990 0.942 ..P WKT 2010 07 27 06 19 55 31.3200 -97.3300 251.000 122.0 100.119 2.500 -999.990 -999.990 1.001 ..P WKT 2010 07 27 06 24 55 31.3200 -97.3300 251.000 457.0 90.853 3.720 -999.990 -999.990 0.909 ..P WKT 2010 07 27 06 29 55 31.3200 -97.3300 251.000 30.0 92.752 3.570 -999.990 -999.990 0.928 ..P WKT 2010 07 27 06 34 55 31.3200 -97.3300 251.000 122.0 97.269 2.310 -999.990 -999.990 0.973 ..P WKT 2010 07 27 06 39 55 31.3200 -97.3300 251.000 457.0 85.524 1.790 -999.990 -999.990 0.855 ..P WKT 2010 07 27 06 49 55 31.3200 -97.3300 251.000 30.0 93.119 3.700 -999.990 -999.990 0.931 ..P WKT 2010 07 27 06 54 55 31.3200 -97.3300 251.000 122.0 97.025 3.770 -999.990 -999.990 0.970 ..P WKT 2010 07 27 06 59 55 31.3200 -97.3300 251.000 457.0 89.632 2.990 -999.990 -999.990 0.896 ..P WKT 2010 07 27 07 04 55 31.3200 -97.3300 251.000 30.0 91.609 2.280 -999.990 -999.990 0.916 ..P WKT 2010 07 27 07 09 55 31.3200 -97.3300 251.000 122.0 96.066 3.370 -999.990 -999.990 0.961 ..P WKT 2010 07 27 07 14 55 31.3200 -97.3300 251.000 457.0 82.612 2.690 -999.990 -999.990 0.826 ..P WKT 2010 07 27 07 24 55 31.3200 -97.3300 251.000 30.0 96.366 2.640 -999.990 -999.990 0.964 ..P WKT 2010 07 27 07 29 55 31.3200 -97.3300 251.000 122.0 96.020 2.750 -999.990 -999.990 0.960 ..P WKT 2010 07 27 07 34 55 31.3200 -97.3300 251.000 457.0 74.738 2.050 -999.990 -999.990 0.747 ..P WKT 2010 07 27 07 39 55 31.3200 -97.3300 251.000 30.0 90.645 2.120 -999.990 -999.990 0.906 ..P WKT 2010 07 27 07 44 55 31.3200 -97.3300 251.000 122.0 94.707 2.390 -999.990 -999.990 0.947 ..P WKT 2010 07 27 07 49 55 31.3200 -97.3300 251.000 457.0 86.924 3.870 -999.990 -999.990 0.869 ..P WKT 2010 07 27 07 59 55 31.3200 -97.3300 251.000 30.0 92.804 2.270 -999.990 -999.990 0.928 ..P WKT 2010 07 27 08 04 55 31.3200 -97.3300 251.000 122.0 99.304 2.300 -999.990 -999.990 0.993 ..P WKT 2010 07 27 08 09 55 31.3200 -97.3300 251.000 457.0 90.657 2.430 -999.990 -999.990 0.907 ..P WKT 2010 07 27 08 14 55 31.3200 -97.3300 251.000 30.0 102.939 3.000 -999.990 -999.990 1.029 ..P WKT 2010 07 27 08 19 55 31.3200 -97.3300 251.000 122.0 104.205 2.350 -999.990 -999.990 1.042 ..P WKT 2010 07 27 08 24 55 31.3200 -97.3300 251.000 457.0 95.560 2.730 -999.990 -999.990 0.956 ..P WKT 2010 07 27 08 34 55 31.3200 -97.3300 251.000 30.0 103.344 3.180 -999.990 -999.990 1.033 ..P WKT 2010 07 27 08 39 55 31.3200 -97.3300 251.000 122.0 106.007 2.450 -999.990 -999.990 1.060 ..P WKT 2010 07 27 08 44 55 31.3200 -97.3300 251.000 457.0 98.621 2.810 -999.990 -999.990 0.986 ..P WKT 2010 07 27 08 49 55 31.3200 -97.3300 251.000 30.0 96.466 3.910 -999.990 -999.990 0.965 ..P WKT 2010 07 27 08 54 55 31.3200 -97.3300 251.000 122.0 100.918 2.430 -999.990 -999.990 1.009 ..P WKT 2010 07 27 08 59 55 31.3200 -97.3300 251.000 457.0 89.680 2.630 -999.990 -999.990 0.897 ..P WKT 2010 07 27 09 09 55 31.3200 -97.3300 251.000 30.0 97.776 2.490 -999.990 -999.990 0.978 ..P WKT 2010 07 27 09 14 55 31.3200 -97.3300 251.000 122.0 104.174 3.360 -999.990 -999.990 1.042 ..P WKT 2010 07 27 09 19 55 31.3200 -97.3300 251.000 457.0 91.030 3.290 -999.990 -999.990 0.910 ..P WKT 2010 07 27 09 24 55 31.3200 -97.3300 251.000 30.0 104.032 4.150 -999.990 -999.990 1.040 ..P WKT 2010 07 27 09 29 55 31.3200 -97.3300 251.000 122.0 101.897 4.360 -999.990 -999.990 1.019 ..P WKT 2010 07 27 09 34 55 31.3200 -97.3300 251.000 457.0 108.431 5.100 -999.990 -999.990 1.084 ..P WKT 2010 07 27 09 44 55 31.3200 -97.3300 251.000 30.0 108.799 4.010 -999.990 -999.990 1.088 ..P WKT 2010 07 27 09 49 55 31.3200 -97.3300 251.000 122.0 98.371 4.020 -999.990 -999.990 0.984 ..P WKT 2010 07 27 09 54 55 31.3200 -97.3300 251.000 457.0 83.130 5.070 -999.990 -999.990 0.831 ..P WKT 2010 07 27 09 59 55 31.3200 -97.3300 251.000 30.0 102.141 3.790 -999.990 -999.990 1.021 ..P WKT 2010 07 27 10 04 55 31.3200 -97.3300 251.000 122.0 96.391 2.370 -999.990 -999.990 0.964 ..P WKT 2010 07 27 10 09 55 31.3200 -97.3300 251.000 457.0 85.966 2.360 -999.990 -999.990 0.860 ..P WKT 2010 07 27 10 19 55 31.3200 -97.3300 251.000 30.0 97.261 2.300 -999.990 -999.990 0.973 ..P WKT 2010 07 27 10 24 55 31.3200 -97.3300 251.000 122.0 101.512 1.790 -999.990 -999.990 1.015 ..P WKT 2010 07 27 10 29 55 31.3200 -97.3300 251.000 457.0 92.837 2.720 -999.990 -999.990 0.928 ..P WKT 2010 07 27 10 34 55 31.3200 -97.3300 251.000 30.0 101.214 3.370 -999.990 -999.990 1.012 ..P WKT 2010 07 27 10 39 55 31.3200 -97.3300 251.000 122.0 96.252 3.890 -999.990 -999.990 0.963 ..P WKT 2010 07 27 10 44 55 31.3200 -97.3300 251.000 457.0 94.316 5.360 -999.990 -999.990 0.943 ..P WKT 2010 07 27 10 54 55 31.3200 -97.3300 251.000 30.0 99.734 1.900 -999.990 -999.990 0.997 ..P WKT 2010 07 27 10 59 55 31.3200 -97.3300 251.000 122.0 102.687 1.730 -999.990 -999.990 1.027 ..P WKT 2010 07 27 11 04 55 31.3200 -97.3300 251.000 457.0 80.897 2.030 -999.990 -999.990 0.809 ..P WKT 2010 07 27 11 09 55 31.3200 -97.3300 251.000 30.0 103.646 2.020 -999.990 -999.990 1.036 ..P WKT 2010 07 27 11 14 55 31.3200 -97.3300 251.000 122.0 107.699 1.510 -999.990 -999.990 1.077 ..P WKT 2010 07 27 11 19 55 31.3200 -97.3300 251.000 457.0 79.314 3.570 -999.990 -999.990 0.793 ..P WKT 2010 07 27 11 29 55 31.3200 -97.3300 251.000 30.0 101.690 2.270 -999.990 -999.990 1.017 ..P WKT 2010 07 27 11 34 55 31.3200 -97.3300 251.000 122.0 105.717 2.080 -999.990 -999.990 1.057 ..P WKT 2010 07 27 11 39 55 31.3200 -97.3300 251.000 457.0 87.482 1.780 -999.990 -999.990 0.875 ..P WKT 2010 07 27 11 44 55 31.3200 -97.3300 251.000 30.0 104.152 3.400 -999.990 -999.990 1.042 ..P WKT 2010 07 27 11 49 55 31.3200 -97.3300 251.000 122.0 103.782 2.910 -999.990 -999.990 1.038 ..P WKT 2010 07 27 12 09 55 31.3200 -97.3300 251.000 457.0 82.897 2.570 -999.990 -999.990 0.829 ..P WKT 2010 07 27 12 10 25 31.3200 -97.3300 251.000 457.0 83.149 3.260 -999.990 -999.990 0.831 ..P WKT 2010 07 27 12 10 55 31.3200 -97.3300 251.000 457.0 85.599 3.720 -999.990 -999.990 0.856 ..P WKT 2010 07 27 12 11 25 31.3200 -97.3300 251.000 457.0 83.376 3.430 -999.990 -999.990 0.834 ..P WKT 2010 07 27 12 11 55 31.3200 -97.3300 251.000 457.0 83.628 2.710 -999.990 -999.990 0.836 ..P WKT 2010 07 27 12 12 25 31.3200 -97.3300 251.000 457.0 88.002 4.480 -999.990 -999.990 0.880 ..P WKT 2010 07 27 12 12 55 31.3200 -97.3300 251.000 457.0 89.902 4.510 -999.990 -999.990 0.899 ..P WKT 2010 07 27 12 13 25 31.3200 -97.3300 251.000 457.0 84.382 2.610 -999.990 -999.990 0.844 ..P WKT 2010 07 27 12 13 55 31.3200 -97.3300 251.000 457.0 87.381 3.410 -999.990 -999.990 0.874 ..P WKT 2010 07 27 12 14 25 31.3200 -97.3300 251.000 457.0 89.831 3.060 -999.990 -999.990 0.898 ..P WKT 2010 07 27 12 14 55 31.3200 -97.3300 251.000 457.0 83.487 2.490 -999.990 -999.990 0.835 ..P WKT 2010 07 27 12 19 55 31.3200 -97.3300 251.000 30.0 110.461 2.940 -999.990 -999.990 1.105 ..P WKT 2010 07 27 12 24 55 31.3200 -97.3300 251.000 122.0 120.397 3.210 -999.990 -999.990 1.204 ..P WKT 2010 07 27 12 29 55 31.3200 -97.3300 251.000 457.0 91.028 2.870 -999.990 -999.990 0.910 ..P WKT 2010 07 27 12 34 55 31.3200 -97.3300 251.000 30.0 105.088 3.370 -999.990 -999.990 1.051 ..P WKT 2010 07 27 12 39 55 31.3200 -97.3300 251.000 122.0 114.337 2.340 -999.990 -999.990 1.143 ..P WKT 2010 07 27 12 44 55 31.3200 -97.3300 251.000 457.0 82.902 2.100 -999.990 -999.990 0.829 ..P WKT 2010 07 27 12 54 55 31.3200 -97.3300 251.000 30.0 113.708 2.580 -999.990 -999.990 1.137 ..P WKT 2010 07 27 12 59 55 31.3200 -97.3300 251.000 122.0 112.446 2.670 -999.990 -999.990 1.124 ..P WKT 2010 07 27 13 04 55 31.3200 -97.3300 251.000 457.0 85.753 2.480 -999.990 -999.990 0.858 ..P WKT 2010 07 27 13 09 55 31.3200 -97.3300 251.000 30.0 116.797 2.200 -999.990 -999.990 1.168 ..P WKT 2010 07 27 13 14 55 31.3200 -97.3300 251.000 122.0 115.123 3.740 -999.990 -999.990 1.151 ..P WKT 2010 07 27 13 19 55 31.3200 -97.3300 251.000 457.0 81.002 2.250 -999.990 -999.990 0.810 ..P WKT 2010 07 27 13 29 55 31.3200 -97.3300 251.000 30.0 111.810 2.790 -999.990 -999.990 1.118 ..P WKT 2010 07 27 13 34 55 31.3200 -97.3300 251.000 122.0 114.319 1.980 -999.990 -999.990 1.143 ..P WKT 2010 07 27 13 39 55 31.3200 -97.3300 251.000 457.0 86.853 2.440 -999.990 -999.990 0.869 ..P WKT 2010 07 27 13 44 55 31.3200 -97.3300 251.000 30.0 112.326 2.770 -999.990 -999.990 1.123 ..P WKT 2010 07 27 13 49 55 31.3200 -97.3300 251.000 122.0 117.449 2.670 -999.990 -999.990 1.174 ..P WKT 2010 07 27 13 54 55 31.3200 -97.3300 251.000 457.0 91.904 1.900 -999.990 -999.990 0.919 ..P WKT 2010 07 27 14 04 55 31.3200 -97.3300 251.000 30.0 115.864 1.890 -999.990 -999.990 1.159 ..P WKT 2010 07 27 14 09 55 31.3200 -97.3300 251.000 122.0 122.874 2.740 -999.990 -999.990 1.229 ..P WKT 2010 07 27 14 14 55 31.3200 -97.3300 251.000 457.0 90.822 2.140 -999.990 -999.990 0.908 ..P WKT 2010 07 27 14 19 55 31.3200 -97.3300 251.000 30.0 122.453 2.810 -999.990 -999.990 1.225 ..P WKT 2010 07 27 14 24 55 31.3200 -97.3300 251.000 122.0 122.999 3.130 -999.990 -999.990 1.230 ..P WKT 2010 07 27 14 29 55 31.3200 -97.3300 251.000 457.0 88.742 3.090 -999.990 -999.990 0.887 ..P WKT 2010 07 27 14 39 55 31.3200 -97.3300 251.000 30.0 124.421 3.170 -999.990 -999.990 1.244 ..P WKT 2010 07 27 14 44 55 31.3200 -97.3300 251.000 122.0 128.740 2.620 -999.990 -999.990 1.287 ..P WKT 2010 07 27 14 49 55 31.3200 -97.3300 251.000 457.0 82.706 2.650 -999.990 -999.990 0.827 ..P WKT 2010 07 27 14 54 55 31.3200 -97.3300 251.000 30.0 112.890 3.180 -999.990 -999.990 1.129 ..P WKT 2010 07 27 14 59 55 31.3200 -97.3300 251.000 122.0 113.632 2.610 -999.990 -999.990 1.136 ..P WKT 2010 07 27 15 04 55 31.3200 -97.3300 251.000 457.0 78.874 2.700 -999.990 -999.990 0.789 ..P WKT 2010 07 27 15 14 55 31.3200 -97.3300 251.000 30.0 111.142 1.820 -999.990 -999.990 1.111 ..P WKT 2010 07 27 15 19 55 31.3200 -97.3300 251.000 122.0 112.946 2.670 -999.990 -999.990 1.129 ..P WKT 2010 07 27 15 24 55 31.3200 -97.3300 251.000 457.0 83.648 3.560 -999.990 -999.990 0.836 ..P WKT 2010 07 27 15 29 55 31.3200 -97.3300 251.000 30.0 102.792 3.550 -999.990 -999.990 1.028 ..P WKT 2010 07 27 15 34 55 31.3200 -97.3300 251.000 122.0 118.084 3.090 -999.990 -999.990 1.181 ..P WKT 2010 07 27 15 39 55 31.3200 -97.3300 251.000 457.0 89.333 2.360 -999.990 -999.990 0.893 ..P WKT 2010 07 27 15 49 55 31.3200 -97.3300 251.000 30.0 108.356 2.230 -999.990 -999.990 1.084 ..P WKT 2010 07 27 15 54 55 31.3200 -97.3300 251.000 122.0 109.610 2.660 -999.990 -999.990 1.096 ..P WKT 2010 07 27 15 59 55 31.3200 -97.3300 251.000 457.0 77.826 3.180 -999.990 -999.990 0.778 ..P WKT 2010 07 27 16 04 55 31.3200 -97.3300 251.000 30.0 93.946 4.040 -999.990 -999.990 0.939 ..P WKT 2010 07 27 16 09 55 31.3200 -97.3300 251.000 122.0 108.140 5.290 -999.990 -999.990 1.081 ..P WKT 2010 07 27 16 14 55 31.3200 -97.3300 251.000 457.0 79.656 3.440 -999.990 -999.990 0.797 ..P WKT 2010 07 27 16 24 55 31.3200 -97.3300 251.000 30.0 92.941 2.610 -999.990 -999.990 0.929 ..P WKT 2010 07 27 16 29 55 31.3200 -97.3300 251.000 122.0 108.417 3.420 -999.990 -999.990 1.084 ..P WKT 2010 07 27 16 34 55 31.3200 -97.3300 251.000 457.0 93.737 4.860 -999.990 -999.990 0.937 ..P WKT 2010 07 27 16 39 55 31.3200 -97.3300 251.000 30.0 101.777 6.300 -999.990 -999.990 1.018 ..P WKT 2010 07 27 16 44 55 31.3200 -97.3300 251.000 122.0 111.746 5.350 -999.990 -999.990 1.117 ..P WKT 2010 07 27 16 49 55 31.3200 -97.3300 251.000 457.0 92.659 4.330 -999.990 -999.990 0.927 ..P WKT 2010 07 27 17 04 55 31.3200 -97.3300 251.000 30.0 101.103 5.600 -999.990 -999.990 1.011 ..P WKT 2010 07 27 17 09 55 31.3200 -97.3300 251.000 122.0 107.985 6.230 -999.990 -999.990 1.080 ..P WKT 2010 07 27 17 14 55 31.3200 -97.3300 251.000 457.0 93.793 6.550 -999.990 -999.990 0.938 ..P WKT 2010 07 27 17 19 55 31.3200 -97.3300 251.000 30.0 102.741 5.450 -999.990 -999.990 1.027 ..P WKT 2010 07 27 17 24 55 31.3200 -97.3300 251.000 122.0 101.221 4.440 -999.990 -999.990 1.012 ..P WKT 2010 07 27 17 29 55 31.3200 -97.3300 251.000 457.0 97.221 3.590 -999.990 -999.990 0.972 ..P WKT 2010 07 27 17 39 55 31.3200 -97.3300 251.000 30.0 98.490 3.760 -999.990 -999.990 0.985 ..P WKT 2010 07 27 17 44 55 31.3200 -97.3300 251.000 122.0 103.897 5.270 -999.990 -999.990 1.039 ..P WKT 2010 07 27 17 49 55 31.3200 -97.3300 251.000 457.0 95.527 5.620 -999.990 -999.990 0.955 ..P WKT 2010 07 27 17 54 55 31.3200 -97.3300 251.000 30.0 100.383 4.290 -999.990 -999.990 1.004 ..P WKT 2010 07 27 17 59 55 31.3200 -97.3300 251.000 122.0 107.169 4.340 -999.990 -999.990 1.072 ..P WKT 2010 07 27 18 04 55 31.3200 -97.3300 251.000 457.0 86.535 3.290 -999.990 -999.990 0.865 ..P WKT 2010 07 27 18 14 55 31.3200 -97.3300 251.000 30.0 100.442 3.950 -999.990 -999.990 1.004 ..P WKT 2010 07 27 18 19 55 31.3200 -97.3300 251.000 122.0 107.012 3.100 -999.990 -999.990 1.070 ..P WKT 2010 07 27 18 24 55 31.3200 -97.3300 251.000 457.0 91.670 3.780 -999.990 -999.990 0.917 ..P WKT 2010 07 27 18 29 55 31.3200 -97.3300 251.000 30.0 93.418 2.860 -999.990 -999.990 0.934 ..P WKT 2010 07 27 18 34 55 31.3200 -97.3300 251.000 122.0 104.536 4.110 -999.990 -999.990 1.045 ..P WKT 2010 07 27 18 39 55 31.3200 -97.3300 251.000 457.0 98.565 2.800 -999.990 -999.990 0.986 ..P WKT 2010 07 27 18 49 55 31.3200 -97.3300 251.000 30.0 90.777 2.460 -999.990 -999.990 0.908 ..P WKT 2010 07 27 18 54 55 31.3200 -97.3300 251.000 122.0 99.712 3.460 -999.990 -999.990 0.997 ..P WKT 2010 07 27 18 59 55 31.3200 -97.3300 251.000 457.0 91.554 5.200 -999.990 -999.990 0.916 ..P WKT 2010 07 27 19 04 55 31.3200 -97.3300 251.000 30.0 89.185 2.110 -999.990 -999.990 0.892 ..P WKT 2010 07 27 19 09 55 31.3200 -97.3300 251.000 122.0 101.429 3.880 -999.990 -999.990 1.014 ..P WKT 2010 07 27 19 14 55 31.3200 -97.3300 251.000 457.0 91.341 3.390 -999.990 -999.990 0.913 ..P WKT 2010 07 27 19 24 55 31.3200 -97.3300 251.000 30.0 91.408 2.150 -999.990 -999.990 0.914 ..P WKT 2010 07 27 19 29 55 31.3200 -97.3300 251.000 122.0 100.464 2.060 -999.990 -999.990 1.005 ..P WKT 2010 07 27 19 34 55 31.3200 -97.3300 251.000 457.0 95.180 2.340 -999.990 -999.990 0.952 ..P WKT 2010 07 27 19 39 55 31.3200 -97.3300 251.000 30.0 89.343 3.120 -999.990 -999.990 0.893 ..P WKT 2010 07 27 19 44 55 31.3200 -97.3300 251.000 122.0 99.227 2.350 -999.990 -999.990 0.992 ..P WKT 2010 07 27 19 49 55 31.3200 -97.3300 251.000 457.0 85.117 2.300 -999.990 -999.990 0.851 ..P WKT 2010 07 27 19 59 55 31.3200 -97.3300 251.000 30.0 87.331 2.890 -999.990 -999.990 0.873 ..P WKT 2010 07 27 20 04 55 31.3200 -97.3300 251.000 122.0 101.177 2.930 -999.990 -999.990 1.012 ..P WKT 2010 07 27 20 09 55 31.3200 -97.3300 251.000 457.0 98.472 4.410 -999.990 -999.990 0.985 ..P WKT 2010 07 27 20 14 55 31.3200 -97.3300 251.000 30.0 88.044 2.370 -999.990 -999.990 0.880 ..P WKT 2010 07 27 20 19 55 31.3200 -97.3300 251.000 122.0 91.960 2.860 -999.990 -999.990 0.920 ..P WKT 2010 07 27 20 24 55 31.3200 -97.3300 251.000 457.0 92.427 2.930 -999.990 -999.990 0.924 ..P WKT 2010 07 27 20 34 55 31.3200 -97.3300 251.000 30.0 90.702 2.940 -999.990 -999.990 0.907 ..P WKT 2010 07 27 20 39 55 31.3200 -97.3300 251.000 122.0 96.648 3.610 -999.990 -999.990 0.966 ..P WKT 2010 07 27 20 44 55 31.3200 -97.3300 251.000 457.0 91.282 2.580 -999.990 -999.990 0.913 ..P WKT 2010 07 27 20 49 55 31.3200 -97.3300 251.000 30.0 86.743 2.180 -999.990 -999.990 0.867 ..P WKT 2010 07 27 20 54 55 31.3200 -97.3300 251.000 122.0 91.173 2.560 -999.990 -999.990 0.912 ..P WKT 2010 07 27 20 59 55 31.3200 -97.3300 251.000 457.0 80.977 3.360 -999.990 -999.990 0.810 ..P WKT 2010 07 27 21 09 55 31.3200 -97.3300 251.000 30.0 89.402 2.220 -999.990 -999.990 0.894 ..P WKT 2010 07 27 21 14 55 31.3200 -97.3300 251.000 122.0 95.055 2.570 -999.990 -999.990 0.951 ..P WKT 2010 07 27 21 19 55 31.3200 -97.3300 251.000 457.0 87.321 3.210 -999.990 -999.990 0.873 ..P WKT 2010 07 27 21 24 55 31.3200 -97.3300 251.000 30.0 92.974 3.980 -999.990 -999.990 0.930 ..P WKT 2010 07 27 21 29 55 31.3200 -97.3300 251.000 122.0 102.629 2.790 -999.990 -999.990 1.026 ..P WKT 2010 07 27 21 34 55 31.3200 -97.3300 251.000 457.0 90.755 2.890 -999.990 -999.990 0.908 ..P WKT 2010 07 27 21 44 55 31.3200 -97.3300 251.000 30.0 98.434 2.740 -999.990 -999.990 0.984 ..P WKT 2010 07 27 21 49 55 31.3200 -97.3300 251.000 122.0 103.359 3.750 -999.990 -999.990 1.034 ..P WKT 2010 07 27 21 54 55 31.3200 -97.3300 251.000 457.0 92.271 2.750 -999.990 -999.990 0.923 ..P WKT 2010 07 27 21 59 55 31.3200 -97.3300 251.000 30.0 98.714 2.750 -999.990 -999.990 0.987 ..P WKT 2010 07 27 22 04 55 31.3200 -97.3300 251.000 122.0 105.020 3.060 -999.990 -999.990 1.050 ..P WKT 2010 07 27 22 09 55 31.3200 -97.3300 251.000 457.0 95.726 3.570 -999.990 -999.990 0.957 ..P WKT 2010 07 27 22 19 55 31.3200 -97.3300 251.000 30.0 92.166 2.990 -999.990 -999.990 0.922 ..P WKT 2010 07 27 22 24 55 31.3200 -97.3300 251.000 122.0 103.836 3.620 -999.990 -999.990 1.038 ..P WKT 2010 07 27 22 29 55 31.3200 -97.3300 251.000 457.0 93.969 4.380 -999.990 -999.990 0.940 ..P WKT 2010 07 27 22 34 55 31.3200 -97.3300 251.000 30.0 89.901 3.120 -999.990 -999.990 0.899 ..P WKT 2010 07 27 22 39 55 31.3200 -97.3300 251.000 122.0 98.811 3.290 -999.990 -999.990 0.988 ..P WKT 2010 07 27 22 44 55 31.3200 -97.3300 251.000 457.0 85.628 3.300 -999.990 -999.990 0.856 ..P WKT 2010 07 27 22 54 55 31.3200 -97.3300 251.000 30.0 83.802 2.520 -999.990 -999.990 0.838 ..P WKT 2010 07 27 22 59 55 31.3200 -97.3300 251.000 122.0 92.674 2.520 -999.990 -999.990 0.927 ..P WKT 2010 07 27 23 04 55 31.3200 -97.3300 251.000 457.0 83.593 2.380 -999.990 -999.990 0.836 ..P WKT 2010 07 27 23 09 55 31.3200 -97.3300 251.000 30.0 81.970 2.400 -999.990 -999.990 0.820 ..P WKT 2010 07 27 23 14 55 31.3200 -97.3300 251.000 122.0 93.605 4.160 -999.990 -999.990 0.936 ..P WKT 2010 07 27 23 19 55 31.3200 -97.3300 251.000 457.0 88.667 2.580 -999.990 -999.990 0.887 ..P WKT 2010 07 27 23 29 55 31.3200 -97.3300 251.000 30.0 84.827 1.490 -999.990 -999.990 0.848 ..P WKT 2010 07 27 23 34 55 31.3200 -97.3300 251.000 122.0 90.623 2.010 -999.990 -999.990 0.906 ..P WKT 2010 07 27 23 39 55 31.3200 -97.3300 251.000 457.0 83.987 2.270 -999.990 -999.990 0.840 ..P WKT 2010 07 27 23 44 55 31.3200 -97.3300 251.000 30.0 91.165 3.150 -999.990 -999.990 0.912 ..P WKT 2010 07 27 23 49 55 31.3200 -97.3300 251.000 122.0 91.436 1.530 -999.990 -999.990 0.914 ..P WKT 2010 07 28 00 09 55 31.3200 -97.3300 251.000 457.0 76.344 1.250 -999.990 -999.990 0.763 ..P WKT 2010 07 28 00 10 25 31.3200 -97.3300 251.000 457.0 74.971 1.660 -999.990 -999.990 0.750 ..P WKT 2010 07 28 00 10 55 31.3200 -97.3300 251.000 457.0 79.679 3.280 -999.990 -999.990 0.797 ..P WKT 2010 07 28 00 11 25 31.3200 -97.3300 251.000 457.0 79.964 3.190 -999.990 -999.990 0.800 ..P WKT 2010 07 28 00 11 55 31.3200 -97.3300 251.000 457.0 76.932 1.250 -999.990 -999.990 0.769 ..P WKT 2010 07 28 00 12 25 31.3200 -97.3300 251.000 457.0 74.731 1.570 -999.990 -999.990 0.747 ..P WKT 2010 07 28 00 12 55 31.3200 -97.3300 251.000 457.0 79.715 2.670 -999.990 -999.990 0.797 ..P WKT 2010 07 28 00 13 25 31.3200 -97.3300 251.000 457.0 77.512 4.600 -999.990 -999.990 0.775 ..P WKT 2010 07 28 00 13 55 31.3200 -97.3300 251.000 457.0 75.724 4.580 -999.990 -999.990 0.757 ..P WKT 2010 07 28 00 14 25 31.3200 -97.3300 251.000 457.0 76.977 3.170 -999.990 -999.990 0.770 ..P WKT 2010 07 28 00 14 55 31.3200 -97.3300 251.000 457.0 79.888 3.100 -999.990 -999.990 0.799 ..P WKT 2010 07 28 00 19 55 31.3200 -97.3300 251.000 30.0 76.384 2.300 -999.990 -999.990 0.764 ..P WKT 2010 07 28 00 24 55 31.3200 -97.3300 251.000 122.0 80.621 3.000 -999.990 -999.990 0.806 ..P WKT 2010 07 28 00 29 55 31.3200 -97.3300 251.000 457.0 84.443 2.030 -999.990 -999.990 0.844 ..P WKT 2010 07 28 00 34 55 31.3200 -97.3300 251.000 30.0 80.938 2.230 -999.990 -999.990 0.809 ..P WKT 2010 07 28 00 39 55 31.3200 -97.3300 251.000 122.0 81.996 2.130 -999.990 -999.990 0.820 ..P WKT 2010 07 28 00 44 55 31.3200 -97.3300 251.000 457.0 84.713 2.830 -999.990 -999.990 0.847 ..P WKT 2010 07 28 00 54 55 31.3200 -97.3300 251.000 30.0 79.521 2.980 -999.990 -999.990 0.795 ..P WKT 2010 07 28 00 59 55 31.3200 -97.3300 251.000 122.0 89.038 2.190 -999.990 -999.990 0.890 ..P WKT 2010 07 28 01 04 55 31.3200 -97.3300 251.000 457.0 94.960 3.050 -999.990 -999.990 0.950 ..P WKT 2010 07 28 01 09 55 31.3200 -97.3300 251.000 30.0 84.698 2.630 -999.990 -999.990 0.847 ..P WKT 2010 07 28 01 14 55 31.3200 -97.3300 251.000 122.0 91.589 2.820 -999.990 -999.990 0.916 ..P WKT 2010 07 28 01 19 55 31.3200 -97.3300 251.000 457.0 89.903 2.210 -999.990 -999.990 0.899 ..P WKT 2010 07 28 01 29 55 31.3200 -97.3300 251.000 30.0 90.702 2.660 -999.990 -999.990 0.907 ..P WKT 2010 07 28 01 34 55 31.3200 -97.3300 251.000 122.0 86.820 2.920 -999.990 -999.990 0.868 ..P WKT 2010 07 28 01 39 55 31.3200 -97.3300 251.000 457.0 89.029 4.020 -999.990 -999.990 0.890 ..P WKT 2010 07 28 01 44 55 31.3200 -97.3300 251.000 30.0 83.485 2.690 -999.990 -999.990 0.835 ..P WKT 2010 07 28 01 49 55 31.3200 -97.3300 251.000 122.0 84.032 2.420 -999.990 -999.990 0.840 ..P WKT 2010 07 28 01 54 55 31.3200 -97.3300 251.000 457.0 85.964 2.420 -999.990 -999.990 0.860 ..P WKT 2010 07 28 02 04 55 31.3200 -97.3300 251.000 30.0 81.638 3.640 -999.990 -999.990 0.816 ..P WKT 2010 07 28 02 09 55 31.3200 -97.3300 251.000 122.0 84.658 1.980 -999.990 -999.990 0.847 ..P WKT 2010 07 28 02 14 55 31.3200 -97.3300 251.000 457.0 68.981 3.520 -999.990 -999.990 0.690 ..P WKT 2010 07 28 02 19 55 31.3200 -97.3300 251.000 30.0 91.671 1.920 -999.990 -999.990 0.917 ..P WKT 2010 07 28 02 24 55 31.3200 -97.3300 251.000 122.0 85.272 4.290 -999.990 -999.990 0.853 ..P WKT 2010 07 28 02 29 55 31.3200 -97.3300 251.000 457.0 71.114 2.500 -999.990 -999.990 0.711 ..P WKT 2010 07 28 02 39 55 31.3200 -97.3300 251.000 30.0 87.173 2.340 -999.990 -999.990 0.872 ..P WKT 2010 07 28 02 44 55 31.3200 -97.3300 251.000 122.0 83.306 3.080 -999.990 -999.990 0.833 ..P WKT 2010 07 28 02 49 55 31.3200 -97.3300 251.000 457.0 116.027 2.930 -999.990 -999.990 1.160 ..P WKT 2010 07 28 02 54 55 31.3200 -97.3300 251.000 30.0 83.056 3.020 -999.990 -999.990 0.831 ..P WKT 2010 07 28 02 59 55 31.3200 -97.3300 251.000 122.0 88.059 2.890 -999.990 -999.990 0.881 ..P WKT 2010 07 28 03 04 55 31.3200 -97.3300 251.000 457.0 83.913 3.460 -999.990 -999.990 0.839 ..P WKT 2010 07 28 03 14 55 31.3200 -97.3300 251.000 30.0 87.268 3.830 -999.990 -999.990 0.873 ..P WKT 2010 07 28 03 19 55 31.3200 -97.3300 251.000 122.0 87.004 4.800 -999.990 -999.990 0.870 ..P WKT 2010 07 28 03 24 55 31.3200 -97.3300 251.000 457.0 80.915 4.110 -999.990 -999.990 0.809 ..P WKT 2010 07 28 03 29 55 31.3200 -97.3300 251.000 30.0 85.089 4.900 -999.990 -999.990 0.851 ..P WKT 2010 07 28 03 34 55 31.3200 -97.3300 251.000 122.0 92.592 4.050 -999.990 -999.990 0.926 ..P WKT 2010 07 28 03 39 55 31.3200 -97.3300 251.000 457.0 84.006 2.640 -999.990 -999.990 0.840 ..P WKT 2010 07 28 03 49 55 31.3200 -97.3300 251.000 30.0 89.582 3.070 -999.990 -999.990 0.896 ..P WKT 2010 07 28 03 54 55 31.3200 -97.3300 251.000 122.0 91.816 2.530 -999.990 -999.990 0.918 ..P WKT 2010 07 28 03 59 55 31.3200 -97.3300 251.000 457.0 81.838 3.340 -999.990 -999.990 0.818 ..P WKT 2010 07 28 04 04 55 31.3200 -97.3300 251.000 30.0 90.456 2.670 -999.990 -999.990 0.905 ..P WKT 2010 07 28 04 09 55 31.3200 -97.3300 251.000 122.0 99.352 3.600 -999.990 -999.990 0.994 ..P WKT 2010 07 28 04 14 55 31.3200 -97.3300 251.000 457.0 87.152 3.430 -999.990 -999.990 0.872 ..P WKT 2010 07 28 04 24 55 31.3200 -97.3300 251.000 30.0 97.116 4.920 -999.990 -999.990 0.971 ..P WKT 2010 07 28 04 29 55 31.3200 -97.3300 251.000 122.0 101.652 2.860 -999.990 -999.990 1.017 ..P WKT 2010 07 28 04 34 55 31.3200 -97.3300 251.000 457.0 92.999 3.510 -999.990 -999.990 0.930 ..P WKT 2010 07 28 04 39 55 31.3200 -97.3300 251.000 30.0 99.897 3.860 -999.990 -999.990 0.999 ..P WKT 2010 07 28 04 44 55 31.3200 -97.3300 251.000 122.0 97.352 4.830 -999.990 -999.990 0.974 ..P WKT 2010 07 28 04 49 55 31.3200 -97.3300 251.000 457.0 88.001 4.140 -999.990 -999.990 0.880 ..P WKT 2010 07 28 05 04 55 31.3200 -97.3300 251.000 30.0 100.729 4.010 -999.990 -999.990 1.007 ..P WKT 2010 07 28 05 09 55 31.3200 -97.3300 251.000 122.0 100.935 3.800 -999.990 -999.990 1.009 ..P WKT 2010 07 28 05 14 55 31.3200 -97.3300 251.000 457.0 80.019 4.350 -999.990 -999.990 0.800 ..P WKT 2010 07 28 05 19 55 31.3200 -97.3300 251.000 30.0 99.957 3.470 -999.990 -999.990 1.000 ..P WKT 2010 07 28 05 24 55 31.3200 -97.3300 251.000 122.0 99.746 4.290 -999.990 -999.990 0.997 ..P WKT 2010 07 28 05 29 55 31.3200 -97.3300 251.000 457.0 77.990 3.850 -999.990 -999.990 0.780 ..P WKT 2010 07 28 05 39 55 31.3200 -97.3300 251.000 30.0 100.232 2.800 -999.990 -999.990 1.002 ..P WKT 2010 07 28 05 44 55 31.3200 -97.3300 251.000 122.0 101.557 3.070 -999.990 -999.990 1.016 ..P WKT 2010 07 28 05 49 55 31.3200 -97.3300 251.000 457.0 80.636 2.500 -999.990 -999.990 0.806 ..P WKT 2010 07 28 05 54 55 31.3200 -97.3300 251.000 30.0 96.839 3.720 -999.990 -999.990 0.968 ..P WKT 2010 07 28 05 59 55 31.3200 -97.3300 251.000 122.0 99.277 3.530 -999.990 -999.990 0.993 ..P WKT 2010 07 28 06 04 55 31.3200 -97.3300 251.000 457.0 75.012 1.940 -999.990 -999.990 0.750 ..P WKT 2010 07 28 06 14 55 31.3200 -97.3300 251.000 30.0 94.909 2.010 -999.990 -999.990 0.949 ..P WKT 2010 07 28 06 19 55 31.3200 -97.3300 251.000 122.0 90.393 2.470 -999.990 -999.990 0.904 ..P WKT 2010 07 28 06 24 55 31.3200 -97.3300 251.000 457.0 74.187 2.370 -999.990 -999.990 0.742 ..P WKT 2010 07 28 06 29 55 31.3200 -97.3300 251.000 30.0 96.662 5.260 -999.990 -999.990 0.967 ..P WKT 2010 07 28 06 34 55 31.3200 -97.3300 251.000 122.0 95.484 2.650 -999.990 -999.990 0.955 ..P WKT 2010 07 28 06 39 55 31.3200 -97.3300 251.000 457.0 76.490 2.720 -999.990 -999.990 0.765 ..P WKT 2010 07 28 06 49 55 31.3200 -97.3300 251.000 30.0 93.299 3.270 -999.990 -999.990 0.933 ..P WKT 2010 07 28 06 54 55 31.3200 -97.3300 251.000 122.0 93.472 3.080 -999.990 -999.990 0.935 ..P WKT 2010 07 28 06 59 55 31.3200 -97.3300 251.000 457.0 69.978 3.130 -999.990 -999.990 0.700 ..P WKT 2010 07 28 07 04 55 31.3200 -97.3300 251.000 30.0 88.528 2.240 -999.990 -999.990 0.885 ..P WKT 2010 07 28 07 09 55 31.3200 -97.3300 251.000 122.0 87.030 2.820 -999.990 -999.990 0.870 ..P WKT 2010 07 28 07 14 55 31.3200 -97.3300 251.000 457.0 81.075 1.670 -999.990 -999.990 0.811 ..P WKT 2010 07 28 07 24 55 31.3200 -97.3300 251.000 30.0 86.394 2.090 -999.990 -999.990 0.864 ..P WKT 2010 07 28 07 29 55 31.3200 -97.3300 251.000 122.0 91.263 1.330 -999.990 -999.990 0.913 ..P WKT 2010 07 28 07 34 55 31.3200 -97.3300 251.000 457.0 75.793 1.600 -999.990 -999.990 0.758 ..P WKT 2010 07 28 07 39 55 31.3200 -97.3300 251.000 30.0 90.694 1.720 -999.990 -999.990 0.907 ..P WKT 2010 07 28 07 44 55 31.3200 -97.3300 251.000 122.0 86.926 2.210 -999.990 -999.990 0.869 ..P WKT 2010 07 28 07 49 55 31.3200 -97.3300 251.000 457.0 80.648 2.840 -999.990 -999.990 0.806 ..P WKT 2010 07 28 07 59 55 31.3200 -97.3300 251.000 30.0 86.847 2.380 -999.990 -999.990 0.868 ..P WKT 2010 07 28 08 04 55 31.3200 -97.3300 251.000 122.0 90.684 2.320 -999.990 -999.990 0.907 ..P WKT 2010 07 28 08 09 55 31.3200 -97.3300 251.000 457.0 75.562 3.160 -999.990 -999.990 0.756 ..P WKT 2010 07 28 08 14 55 31.3200 -97.3300 251.000 30.0 86.927 4.770 -999.990 -999.990 0.869 ..P WKT 2010 07 28 08 19 55 31.3200 -97.3300 251.000 122.0 90.347 2.510 -999.990 -999.990 0.903 ..P WKT 2010 07 28 08 24 55 31.3200 -97.3300 251.000 457.0 76.476 3.530 -999.990 -999.990 0.765 ..P WKT 2010 07 28 08 34 55 31.3200 -97.3300 251.000 30.0 90.368 3.450 -999.990 -999.990 0.904 ..P WKT 2010 07 28 08 39 55 31.3200 -97.3300 251.000 122.0 87.314 3.590 -999.990 -999.990 0.873 ..P WKT 2010 07 28 08 44 55 31.3200 -97.3300 251.000 457.0 83.561 2.790 -999.990 -999.990 0.836 ..P WKT 2010 07 28 08 49 55 31.3200 -97.3300 251.000 30.0 93.201 3.120 -999.990 -999.990 0.932 ..P WKT 2010 07 28 08 54 55 31.3200 -97.3300 251.000 122.0 89.866 2.820 -999.990 -999.990 0.899 ..P WKT 2010 07 28 08 59 55 31.3200 -97.3300 251.000 457.0 77.322 2.890 -999.990 -999.990 0.773 ..P WKT 2010 07 28 09 09 55 31.3200 -97.3300 251.000 30.0 90.745 2.710 -999.990 -999.990 0.907 ..P WKT 2010 07 28 09 14 55 31.3200 -97.3300 251.000 122.0 87.688 3.030 -999.990 -999.990 0.877 ..P WKT 2010 07 28 09 19 55 31.3200 -97.3300 251.000 457.0 82.118 4.880 -999.990 -999.990 0.821 ..P WKT 2010 07 28 09 24 55 31.3200 -97.3300 251.000 30.0 86.319 3.710 -999.990 -999.990 0.863 ..P WKT 2010 07 28 09 29 55 31.3200 -97.3300 251.000 122.0 91.499 2.980 -999.990 -999.990 0.915 ..P WKT 2010 07 28 09 34 55 31.3200 -97.3300 251.000 457.0 77.969 3.000 -999.990 -999.990 0.780 ..P WKT 2010 07 28 09 44 55 31.3200 -97.3300 251.000 30.0 84.339 2.490 -999.990 -999.990 0.843 ..P WKT 2010 07 28 09 49 55 31.3200 -97.3300 251.000 122.0 89.859 2.860 -999.990 -999.990 0.899 ..P WKT 2010 07 28 09 54 55 31.3200 -97.3300 251.000 457.0 80.156 2.320 -999.990 -999.990 0.802 ..P WKT 2010 07 28 09 59 55 31.3200 -97.3300 251.000 30.0 82.184 2.850 -999.990 -999.990 0.822 ..P WKT 2010 07 28 10 04 55 31.3200 -97.3300 251.000 122.0 78.206 2.460 -999.990 -999.990 0.782 ..P WKT 2010 07 28 10 09 55 31.3200 -97.3300 251.000 457.0 73.807 2.780 -999.990 -999.990 0.738 ..P WKT 2010 07 28 10 19 55 31.3200 -97.3300 251.000 30.0 83.674 2.810 -999.990 -999.990 0.837 ..P WKT 2010 07 28 10 24 55 31.3200 -97.3300 251.000 122.0 93.749 2.350 -999.990 -999.990 0.937 ..P WKT 2010 07 28 10 29 55 31.3200 -97.3300 251.000 457.0 80.905 2.240 -999.990 -999.990 0.809 ..P WKT 2010 07 28 10 34 55 31.3200 -97.3300 251.000 30.0 89.305 2.640 -999.990 -999.990 0.893 ..P WKT 2010 07 28 10 39 55 31.3200 -97.3300 251.000 122.0 96.588 3.200 -999.990 -999.990 0.966 ..P WKT 2010 07 28 10 44 55 31.3200 -97.3300 251.000 457.0 87.375 2.490 -999.990 -999.990 0.874 ..P WKT 2010 07 28 10 54 55 31.3200 -97.3300 251.000 30.0 98.669 1.740 -999.990 -999.990 0.987 ..P WKT 2010 07 28 10 59 55 31.3200 -97.3300 251.000 122.0 88.135 2.750 -999.990 -999.990 0.881 ..P WKT 2010 07 28 11 04 55 31.3200 -97.3300 251.000 457.0 77.321 2.480 -999.990 -999.990 0.773 ..P WKT 2010 07 28 11 09 55 31.3200 -97.3300 251.000 30.0 81.609 2.610 -999.990 -999.990 0.816 ..P WKT 2010 07 28 11 14 55 31.3200 -97.3300 251.000 122.0 87.857 1.840 -999.990 -999.990 0.879 ..P WKT 2010 07 28 11 19 55 31.3200 -97.3300 251.000 457.0 90.468 2.410 -999.990 -999.990 0.905 ..P WKT 2010 07 28 11 29 55 31.3200 -97.3300 251.000 30.0 85.645 2.590 -999.990 -999.990 0.856 ..P WKT 2010 07 28 11 34 55 31.3200 -97.3300 251.000 122.0 83.524 1.970 -999.990 -999.990 0.835 ..P WKT 2010 07 28 11 39 55 31.3200 -97.3300 251.000 457.0 69.928 2.730 -999.990 -999.990 0.699 ..P WKT 2010 07 28 11 44 55 31.3200 -97.3300 251.000 30.0 87.959 1.850 -999.990 -999.990 0.880 ..P WKT 2010 07 28 11 49 55 31.3200 -97.3300 251.000 122.0 84.999 2.430 -999.990 -999.990 0.850 ..P WKT 2010 07 28 12 09 55 31.3200 -97.3300 251.000 457.0 78.804 3.020 -999.990 -999.990 0.788 ..P WKT 2010 07 28 12 10 25 31.3200 -97.3300 251.000 457.0 80.252 2.400 -999.990 -999.990 0.803 ..P WKT 2010 07 28 12 10 55 31.3200 -97.3300 251.000 457.0 77.502 2.380 -999.990 -999.990 0.775 ..P WKT 2010 07 28 12 11 25 31.3200 -97.3300 251.000 457.0 74.192 2.170 -999.990 -999.990 0.742 ..P WKT 2010 07 28 12 11 55 31.3200 -97.3300 251.000 457.0 74.241 2.180 -999.990 -999.990 0.742 ..P WKT 2010 07 28 12 12 25 31.3200 -97.3300 251.000 457.0 73.590 3.400 -999.990 -999.990 0.736 ..P WKT 2010 07 28 12 12 55 31.3200 -97.3300 251.000 457.0 75.318 2.630 -999.990 -999.990 0.753 ..P WKT 2010 07 28 12 13 25 31.3200 -97.3300 251.000 457.0 74.387 2.260 -999.990 -999.990 0.744 ..P WKT 2010 07 28 12 13 55 31.3200 -97.3300 251.000 457.0 75.555 2.290 -999.990 -999.990 0.756 ..P WKT 2010 07 28 12 14 25 31.3200 -97.3300 251.000 457.0 74.345 3.080 -999.990 -999.990 0.743 ..P WKT 2010 07 28 12 14 55 31.3200 -97.3300 251.000 457.0 72.574 2.180 -999.990 -999.990 0.726 ..P WKT 2010 07 28 12 19 55 31.3200 -97.3300 251.000 30.0 82.717 2.350 -999.990 -999.990 0.827 ..P WKT 2010 07 28 12 24 55 31.3200 -97.3300 251.000 122.0 86.980 2.480 -999.990 -999.990 0.870 ..P WKT 2010 07 28 12 29 55 31.3200 -97.3300 251.000 457.0 71.100 3.750 -999.990 -999.990 0.711 ..P WKT 2010 07 28 12 34 55 31.3200 -97.3300 251.000 30.0 83.337 3.690 -999.990 -999.990 0.833 ..P WKT 2010 07 28 12 39 55 31.3200 -97.3300 251.000 122.0 90.256 3.730 -999.990 -999.990 0.903 ..P WKT 2010 07 28 12 44 55 31.3200 -97.3300 251.000 457.0 78.856 3.030 -999.990 -999.990 0.789 ..P WKT 2010 07 28 12 54 55 31.3200 -97.3300 251.000 30.0 86.482 2.790 -999.990 -999.990 0.865 ..P WKT 2010 07 28 12 59 55 31.3200 -97.3300 251.000 122.0 84.954 3.150 -999.990 -999.990 0.850 ..P WKT 2010 07 28 13 04 55 31.3200 -97.3300 251.000 457.0 78.814 4.880 -999.990 -999.990 0.788 ..P WKT 2010 07 28 13 09 55 31.3200 -97.3300 251.000 30.0 82.736 2.100 -999.990 -999.990 0.827 ..P WKT 2010 07 28 13 14 55 31.3200 -97.3300 251.000 122.0 87.634 2.640 -999.990 -999.990 0.876 ..P WKT 2010 07 28 13 19 55 31.3200 -97.3300 251.000 457.0 76.748 1.630 -999.990 -999.990 0.767 ..P WKT 2010 07 28 13 29 55 31.3200 -97.3300 251.000 30.0 83.451 2.780 -999.990 -999.990 0.835 ..P WKT 2010 07 28 13 34 55 31.3200 -97.3300 251.000 122.0 87.350 1.730 -999.990 -999.990 0.873 ..P WKT 2010 07 28 13 39 55 31.3200 -97.3300 251.000 457.0 79.101 2.690 -999.990 -999.990 0.791 ..P WKT 2010 07 28 13 44 55 31.3200 -97.3300 251.000 30.0 79.370 2.080 -999.990 -999.990 0.794 ..P WKT 2010 07 28 13 49 55 31.3200 -97.3300 251.000 122.0 92.340 4.450 -999.990 -999.990 0.923 ..P WKT 2010 07 28 13 54 55 31.3200 -97.3300 251.000 457.0 77.256 2.580 -999.990 -999.990 0.773 ..P WKT 2010 07 28 14 04 55 31.3200 -97.3300 251.000 30.0 82.857 3.330 -999.990 -999.990 0.829 ..P WKT 2010 07 28 14 09 55 31.3200 -97.3300 251.000 122.0 91.673 4.330 -999.990 -999.990 0.917 ..P WKT 2010 07 28 14 14 55 31.3200 -97.3300 251.000 457.0 79.846 2.130 -999.990 -999.990 0.798 ..P WKT 2010 07 28 14 19 55 31.3200 -97.3300 251.000 30.0 85.873 2.370 -999.990 -999.990 0.859 ..P WKT 2010 07 28 14 24 55 31.3200 -97.3300 251.000 122.0 84.646 2.900 -999.990 -999.990 0.846 ..P WKT 2010 07 28 14 29 55 31.3200 -97.3300 251.000 457.0 80.911 1.760 -999.990 -999.990 0.809 ..P WKT 2010 07 28 14 39 55 31.3200 -97.3300 251.000 30.0 83.657 1.960 -999.990 -999.990 0.837 ..P WKT 2010 07 28 14 44 55 31.3200 -97.3300 251.000 122.0 89.300 2.710 -999.990 -999.990 0.893 ..P WKT 2010 07 28 14 49 55 31.3200 -97.3300 251.000 457.0 81.566 4.220 -999.990 -999.990 0.816 ..P WKT 2010 07 28 14 54 55 31.3200 -97.3300 251.000 30.0 82.470 2.910 -999.990 -999.990 0.825 ..P WKT 2010 07 28 14 59 55 31.3200 -97.3300 251.000 122.0 91.454 4.160 -999.990 -999.990 0.915 ..P WKT 2010 07 28 15 04 55 31.3200 -97.3300 251.000 457.0 82.329 3.490 -999.990 -999.990 0.823 ..P WKT 2010 07 28 15 14 55 31.3200 -97.3300 251.000 30.0 86.843 3.950 -999.990 -999.990 0.868 ..P WKT 2010 07 28 15 19 55 31.3200 -97.3300 251.000 122.0 86.275 3.800 -999.990 -999.990 0.863 ..P WKT 2010 07 28 15 24 55 31.3200 -97.3300 251.000 457.0 81.253 3.620 -999.990 -999.990 0.813 ..P WKT 2010 07 28 15 29 55 31.3200 -97.3300 251.000 30.0 83.469 3.630 -999.990 -999.990 0.835 ..P WKT 2010 07 28 15 34 55 31.3200 -97.3300 251.000 122.0 90.138 3.550 -999.990 -999.990 0.901 ..P WKT 2010 07 28 15 39 55 31.3200 -97.3300 251.000 457.0 77.882 3.090 -999.990 -999.990 0.779 ..P WKT 2010 07 28 15 49 55 31.3200 -97.3300 251.000 30.0 82.274 2.900 -999.990 -999.990 0.823 ..P WKT 2010 07 28 15 54 55 31.3200 -97.3300 251.000 122.0 88.343 2.930 -999.990 -999.990 0.883 ..P WKT 2010 07 28 15 59 55 31.3200 -97.3300 251.000 457.0 78.557 2.990 -999.990 -999.990 0.786 ..P WKT 2010 07 28 16 04 55 31.3200 -97.3300 251.000 30.0 84.764 4.200 -999.990 -999.990 0.848 ..P WKT 2010 07 28 16 09 55 31.3200 -97.3300 251.000 122.0 92.499 3.300 -999.990 -999.990 0.925 ..P WKT 2010 07 28 16 14 55 31.3200 -97.3300 251.000 457.0 85.636 4.360 -999.990 -999.990 0.856 ..P WKT 2010 07 28 16 24 55 31.3200 -97.3300 251.000 30.0 83.887 3.350 -999.990 -999.990 0.839 ..P WKT 2010 07 28 16 29 55 31.3200 -97.3300 251.000 122.0 86.079 4.880 -999.990 -999.990 0.861 ..P WKT 2010 07 28 16 34 55 31.3200 -97.3300 251.000 457.0 74.099 3.180 -999.990 -999.990 0.741 ..P WKT 2010 07 28 16 39 55 31.3200 -97.3300 251.000 30.0 87.267 2.890 -999.990 -999.990 0.873 ..P WKT 2010 07 28 16 44 55 31.3200 -97.3300 251.000 122.0 83.763 2.390 -999.990 -999.990 0.838 ..P WKT 2010 07 28 16 49 55 31.3200 -97.3300 251.000 457.0 73.316 2.510 -999.990 -999.990 0.733 ..P WKT 2010 07 28 17 04 55 31.3200 -97.3300 251.000 30.0 72.991 3.520 -999.990 -999.990 0.730 ..P WKT 2010 07 28 17 09 55 31.3200 -97.3300 251.000 122.0 79.089 2.630 -999.990 -999.990 0.791 ..P WKT 2010 07 28 17 14 55 31.3200 -97.3300 251.000 457.0 76.026 2.950 -999.990 -999.990 0.760 ..P WKT 2010 07 28 17 19 55 31.3200 -97.3300 251.000 30.0 77.542 2.440 -999.990 -999.990 0.775 ..P WKT 2010 07 28 17 24 55 31.3200 -97.3300 251.000 122.0 82.805 3.480 -999.990 -999.990 0.828 ..P WKT 2010 07 28 17 29 55 31.3200 -97.3300 251.000 457.0 80.019 2.720 -999.990 -999.990 0.800 ..P WKT 2010 07 28 17 39 55 31.3200 -97.3300 251.000 30.0 81.861 5.140 -999.990 -999.990 0.819 ..P WKT 2010 07 28 17 44 55 31.3200 -97.3300 251.000 122.0 89.120 2.210 -999.990 -999.990 0.891 ..P WKT 2010 07 28 17 49 55 31.3200 -97.3300 251.000 457.0 82.929 2.920 -999.990 -999.990 0.829 ..P WKT 2010 07 28 17 54 55 31.3200 -97.3300 251.000 30.0 86.582 3.720 -999.990 -999.990 0.866 ..P WKT 2010 07 28 17 59 55 31.3200 -97.3300 251.000 122.0 94.116 3.450 -999.990 -999.990 0.941 ..P WKT 2010 07 28 18 04 55 31.3200 -97.3300 251.000 457.0 83.491 3.630 -999.990 -999.990 0.835 ..P WKT 2010 07 28 18 14 55 31.3200 -97.3300 251.000 30.0 87.349 4.080 -999.990 -999.990 0.873 ..P WKT 2010 07 28 18 19 55 31.3200 -97.3300 251.000 122.0 87.694 3.370 -999.990 -999.990 0.877 ..P WKT 2010 07 28 18 24 55 31.3200 -97.3300 251.000 457.0 85.268 3.190 -999.990 -999.990 0.853 ..P WKT 2010 07 28 18 29 55 31.3200 -97.3300 251.000 30.0 81.181 2.750 -999.990 -999.990 0.812 ..P WKT 2010 07 28 18 34 55 31.3200 -97.3300 251.000 122.0 81.251 2.470 -999.990 -999.990 0.813 ..P WKT 2010 07 28 18 39 55 31.3200 -97.3300 251.000 457.0 79.934 3.420 -999.990 -999.990 0.799 ..P WKT 2010 07 28 18 49 55 31.3200 -97.3300 251.000 30.0 84.502 2.590 -999.990 -999.990 0.845 ..P WKT 2010 07 28 18 54 55 31.3200 -97.3300 251.000 122.0 80.694 5.010 -999.990 -999.990 0.807 ..P WKT 2010 07 28 18 59 55 31.3200 -97.3300 251.000 457.0 75.504 1.620 -999.990 -999.990 0.755 ..P WKT 2010 07 28 19 04 55 31.3200 -97.3300 251.000 30.0 81.662 3.520 -999.990 -999.990 0.817 ..P WKT 2010 07 28 19 09 55 31.3200 -97.3300 251.000 122.0 88.371 1.500 -999.990 -999.990 0.884 ..P WKT 2010 07 28 19 14 55 31.3200 -97.3300 251.000 457.0 68.519 1.660 -999.990 -999.990 0.685 ..P WKT 2010 07 28 19 24 55 31.3200 -97.3300 251.000 30.0 74.962 2.530 -999.990 -999.990 0.750 ..P WKT 2010 07 28 19 29 55 31.3200 -97.3300 251.000 122.0 85.481 3.410 -999.990 -999.990 0.855 ..P WKT 2010 07 28 19 34 55 31.3200 -97.3300 251.000 457.0 74.429 2.770 -999.990 -999.990 0.744 ..P WKT 2010 07 28 19 39 55 31.3200 -97.3300 251.000 30.0 85.775 4.870 -999.990 -999.990 0.858 ..P WKT 2010 07 28 19 44 55 31.3200 -97.3300 251.000 122.0 76.108 3.530 -999.990 -999.990 0.761 ..P WKT 2010 07 28 19 49 55 31.3200 -97.3300 251.000 457.0 75.566 3.160 -999.990 -999.990 0.756 ..P WKT 2010 07 28 19 59 55 31.3200 -97.3300 251.000 30.0 76.790 3.140 -999.990 -999.990 0.768 ..P WKT 2010 07 28 20 04 55 31.3200 -97.3300 251.000 122.0 80.904 3.640 -999.990 -999.990 0.809 ..P WKT 2010 07 28 20 09 55 31.3200 -97.3300 251.000 457.0 75.350 3.510 -999.990 -999.990 0.753 ..P WKT 2010 07 28 20 14 55 31.3200 -97.3300 251.000 30.0 78.358 4.070 -999.990 -999.990 0.784 ..P WKT 2010 07 28 20 19 55 31.3200 -97.3300 251.000 122.0 93.794 3.460 -999.990 -999.990 0.938 ..P WKT 2010 07 28 20 24 55 31.3200 -97.3300 251.000 457.0 71.257 4.060 -999.990 -999.990 0.713 ..P WKT 2010 07 28 20 34 55 31.3200 -97.3300 251.000 30.0 101.960 3.620 -999.990 -999.990 1.020 ..P WKT 2010 07 28 20 39 55 31.3200 -97.3300 251.000 122.0 86.036 3.530 -999.990 -999.990 0.860 ..P WKT 2010 07 28 20 44 55 31.3200 -97.3300 251.000 457.0 74.947 2.490 -999.990 -999.990 0.749 ..P WKT 2010 07 28 20 49 55 31.3200 -97.3300 251.000 30.0 96.559 3.040 -999.990 -999.990 0.966 ..P WKT 2010 07 28 20 54 55 31.3200 -97.3300 251.000 122.0 95.128 3.000 -999.990 -999.990 0.951 ..P WKT 2010 07 28 20 59 55 31.3200 -97.3300 251.000 457.0 77.834 2.260 -999.990 -999.990 0.778 ..P WKT 2010 07 28 21 09 55 31.3200 -97.3300 251.000 30.0 105.946 2.930 -999.990 -999.990 1.059 ..P WKT 2010 07 28 21 14 55 31.3200 -97.3300 251.000 122.0 84.738 3.680 -999.990 -999.990 0.847 ..P WKT 2010 07 28 21 19 55 31.3200 -97.3300 251.000 457.0 75.530 3.000 -999.990 -999.990 0.755 ..P WKT 2010 07 28 21 24 55 31.3200 -97.3300 251.000 30.0 81.625 2.470 -999.990 -999.990 0.816 ..P WKT 2010 07 28 21 29 55 31.3200 -97.3300 251.000 122.0 89.923 2.820 -999.990 -999.990 0.899 ..P WKT 2010 07 28 21 34 55 31.3200 -97.3300 251.000 457.0 76.308 3.370 -999.990 -999.990 0.763 ..P WKT 2010 07 28 21 44 55 31.3200 -97.3300 251.000 30.0 84.121 1.720 -999.990 -999.990 0.841 ..P WKT 2010 07 28 21 49 55 31.3200 -97.3300 251.000 122.0 78.266 3.610 -999.990 -999.990 0.783 ..P WKT 2010 07 28 21 54 55 31.3200 -97.3300 251.000 457.0 80.952 2.240 -999.990 -999.990 0.810 ..P WKT 2010 07 28 21 59 55 31.3200 -97.3300 251.000 30.0 80.470 3.610 -999.990 -999.990 0.805 ..P WKT 2010 07 28 22 04 55 31.3200 -97.3300 251.000 122.0 100.090 3.440 -999.990 -999.990 1.001 ..P WKT 2010 07 28 22 09 55 31.3200 -97.3300 251.000 457.0 86.664 2.630 -999.990 -999.990 0.867 ..P WKT 2010 07 28 22 19 55 31.3200 -97.3300 251.000 30.0 81.254 1.350 -999.990 -999.990 0.813 ..P WKT 2010 07 28 22 24 55 31.3200 -97.3300 251.000 122.0 84.311 2.060 -999.990 -999.990 0.843 ..P WKT 2010 07 28 22 29 55 31.3200 -97.3300 251.000 457.0 83.238 3.220 -999.990 -999.990 0.832 ..P WKT 2010 07 28 22 34 55 31.3200 -97.3300 251.000 30.0 87.669 2.000 -999.990 -999.990 0.877 ..P WKT 2010 07 28 22 39 55 31.3200 -97.3300 251.000 122.0 86.047 1.360 -999.990 -999.990 0.860 ..P WKT 2010 07 28 22 44 55 31.3200 -97.3300 251.000 457.0 82.499 1.630 -999.990 -999.990 0.825 ..P WKT 2010 07 28 22 54 55 31.3200 -97.3300 251.000 30.0 88.489 1.790 -999.990 -999.990 0.885 ..P WKT 2010 07 28 22 59 55 31.3200 -97.3300 251.000 122.0 87.573 3.610 -999.990 -999.990 0.876 ..P WKT 2010 07 28 23 04 55 31.3200 -97.3300 251.000 457.0 80.336 2.410 -999.990 -999.990 0.803 ..P WKT 2010 07 28 23 09 55 31.3200 -97.3300 251.000 30.0 81.621 3.500 -999.990 -999.990 0.816 ..P WKT 2010 07 28 23 14 55 31.3200 -97.3300 251.000 122.0 83.181 3.300 -999.990 -999.990 0.832 ..P WKT 2010 07 28 23 19 55 31.3200 -97.3300 251.000 457.0 76.772 3.470 -999.990 -999.990 0.768 ..P WKT 2010 07 28 23 29 55 31.3200 -97.3300 251.000 30.0 79.404 2.490 -999.990 -999.990 0.794 ..P WKT 2010 07 28 23 34 55 31.3200 -97.3300 251.000 122.0 89.266 2.890 -999.990 -999.990 0.893 ..P WKT 2010 07 28 23 39 55 31.3200 -97.3300 251.000 457.0 83.469 2.370 -999.990 -999.990 0.835 ..P WKT 2010 07 28 23 44 55 31.3200 -97.3300 251.000 30.0 78.223 2.790 -999.990 -999.990 0.782 ..P WKT 2010 07 28 23 49 55 31.3200 -97.3300 251.000 122.0 85.335 2.970 -999.990 -999.990 0.853 ..P WKT 2010 07 29 00 09 55 31.3200 -97.3300 251.000 457.0 85.531 1.900 -999.990 -999.990 0.855 ..P WKT 2010 07 29 00 10 25 31.3200 -97.3300 251.000 457.0 82.716 3.100 -999.990 -999.990 0.827 ..P WKT 2010 07 29 00 10 55 31.3200 -97.3300 251.000 457.0 80.449 2.150 -999.990 -999.990 0.804 ..P WKT 2010 07 29 00 11 25 31.3200 -97.3300 251.000 457.0 80.929 2.280 -999.990 -999.990 0.809 ..P WKT 2010 07 29 00 11 55 31.3200 -97.3300 251.000 457.0 76.877 2.690 -999.990 -999.990 0.769 ..P WKT 2010 07 29 00 12 25 31.3200 -97.3300 251.000 457.0 82.437 2.180 -999.990 -999.990 0.824 ..P WKT 2010 07 29 00 12 55 31.3200 -97.3300 251.000 457.0 81.405 2.260 -999.990 -999.990 0.814 ..P WKT 2010 07 29 00 13 25 31.3200 -97.3300 251.000 457.0 83.257 2.710 -999.990 -999.990 0.833 ..P WKT 2010 07 29 00 13 55 31.3200 -97.3300 251.000 457.0 76.597 2.900 -999.990 -999.990 0.766 ..P WKT 2010 07 29 00 14 25 31.3200 -97.3300 251.000 457.0 86.688 4.200 -999.990 -999.990 0.867 ..P WKT 2010 07 29 00 14 55 31.3200 -97.3300 251.000 457.0 83.735 3.410 -999.990 -999.990 0.837 ..P WKT 2010 07 29 00 19 55 31.3200 -97.3300 251.000 30.0 81.250 4.820 -999.990 -999.990 0.812 ..P WKT 2010 07 29 00 24 55 31.3200 -97.3300 251.000 122.0 84.397 2.980 -999.990 -999.990 0.844 ..P WKT 2010 07 29 00 29 55 31.3200 -97.3300 251.000 457.0 83.286 2.930 -999.990 -999.990 0.833 ..P WKT 2010 07 29 00 34 55 31.3200 -97.3300 251.000 30.0 80.801 1.870 -999.990 -999.990 0.808 ..P WKT 2010 07 29 00 39 55 31.3200 -97.3300 251.000 122.0 83.398 2.230 -999.990 -999.990 0.834 ..P WKT 2010 07 29 00 44 55 31.3200 -97.3300 251.000 457.0 79.264 1.680 -999.990 -999.990 0.793 ..P WKT 2010 07 29 00 54 55 31.3200 -97.3300 251.000 30.0 75.937 1.480 -999.990 -999.990 0.759 ..P WKT 2010 07 29 00 59 55 31.3200 -97.3300 251.000 122.0 84.164 3.100 -999.990 -999.990 0.842 ..P WKT 2010 07 29 01 04 55 31.3200 -97.3300 251.000 457.0 78.788 2.190 -999.990 -999.990 0.788 ..P WKT 2010 07 29 01 09 55 31.3200 -97.3300 251.000 30.0 70.524 2.880 -999.990 -999.990 0.705 ..P WKT 2010 07 29 01 14 55 31.3200 -97.3300 251.000 122.0 79.715 2.250 -999.990 -999.990 0.797 ..P WKT 2010 07 29 01 19 55 31.3200 -97.3300 251.000 457.0 74.337 2.420 -999.990 -999.990 0.743 ..P WKT 2010 07 29 01 29 55 31.3200 -97.3300 251.000 30.0 75.559 3.460 -999.990 -999.990 0.756 ..P WKT 2010 07 29 01 34 55 31.3200 -97.3300 251.000 122.0 81.199 1.860 -999.990 -999.990 0.812 ..P WKT 2010 07 29 01 39 55 31.3200 -97.3300 251.000 457.0 73.776 2.690 -999.990 -999.990 0.738 ..P WKT 2010 07 29 01 44 55 31.3200 -97.3300 251.000 30.0 81.342 3.310 -999.990 -999.990 0.813 ..P WKT 2010 07 29 01 49 55 31.3200 -97.3300 251.000 122.0 88.497 1.780 -999.990 -999.990 0.885 ..P WKT 2010 07 29 01 54 55 31.3200 -97.3300 251.000 457.0 81.347 2.380 -999.990 -999.990 0.813 ..P WKT 2010 07 29 02 04 55 31.3200 -97.3300 251.000 30.0 91.023 1.770 -999.990 -999.990 0.910 ..P WKT 2010 07 29 02 09 55 31.3200 -97.3300 251.000 122.0 82.535 2.260 -999.990 -999.990 0.825 ..P WKT 2010 07 29 02 14 55 31.3200 -97.3300 251.000 457.0 88.632 2.970 -999.990 -999.990 0.886 ..P WKT 2010 07 29 02 19 55 31.3200 -97.3300 251.000 30.0 82.344 2.810 -999.990 -999.990 0.823 ..P WKT 2010 07 29 02 24 55 31.3200 -97.3300 251.000 122.0 84.313 2.690 -999.990 -999.990 0.843 ..P WKT 2010 07 29 02 29 55 31.3200 -97.3300 251.000 457.0 77.748 3.600 -999.990 -999.990 0.777 ..P WKT 2010 07 29 02 39 55 31.3200 -97.3300 251.000 30.0 87.429 2.930 -999.990 -999.990 0.874 ..P WKT 2010 07 29 02 44 55 31.3200 -97.3300 251.000 122.0 92.389 3.180 -999.990 -999.990 0.924 ..P WKT 2010 07 29 02 49 55 31.3200 -97.3300 251.000 457.0 83.305 2.860 -999.990 -999.990 0.833 ..P WKT 2010 07 29 02 54 55 31.3200 -97.3300 251.000 30.0 83.033 3.880 -999.990 -999.990 0.830 ..P WKT 2010 07 29 02 59 55 31.3200 -97.3300 251.000 122.0 84.688 3.400 -999.990 -999.990 0.847 ..P WKT 2010 07 29 03 04 55 31.3200 -97.3300 251.000 457.0 88.823 2.780 -999.990 -999.990 0.888 ..P WKT 2010 07 29 03 14 55 31.3200 -97.3300 251.000 30.0 83.398 1.950 -999.990 -999.990 0.834 ..P WKT 2010 07 29 03 19 55 31.3200 -97.3300 251.000 122.0 86.787 2.190 -999.990 -999.990 0.868 ..P WKT 2010 07 29 03 24 55 31.3200 -97.3300 251.000 457.0 74.468 2.980 -999.990 -999.990 0.745 ..P WKT 2010 07 29 03 29 55 31.3200 -97.3300 251.000 30.0 86.399 2.680 -999.990 -999.990 0.864 ..P WKT 2010 07 29 03 34 55 31.3200 -97.3300 251.000 122.0 81.520 3.300 -999.990 -999.990 0.815 ..P WKT 2010 07 29 03 39 55 31.3200 -97.3300 251.000 457.0 86.839 2.550 -999.990 -999.990 0.868 ..P WKT 2010 07 29 03 49 55 31.3200 -97.3300 251.000 30.0 81.331 3.200 -999.990 -999.990 0.813 ..P WKT 2010 07 29 03 54 55 31.3200 -97.3300 251.000 122.0 78.085 3.860 -999.990 -999.990 0.781 ..P WKT 2010 07 29 03 59 55 31.3200 -97.3300 251.000 457.0 79.938 4.160 -999.990 -999.990 0.799 ..P WKT 2010 07 29 04 04 55 31.3200 -97.3300 251.000 30.0 89.101 3.270 -999.990 -999.990 0.891 ..P WKT 2010 07 29 04 09 55 31.3200 -97.3300 251.000 122.0 82.682 2.190 -999.990 -999.990 0.827 ..P WKT 2010 07 29 04 14 55 31.3200 -97.3300 251.000 457.0 79.296 4.270 -999.990 -999.990 0.793 ..P WKT 2010 07 29 04 24 55 31.3200 -97.3300 251.000 30.0 82.710 2.250 -999.990 -999.990 0.827 ..P WKT 2010 07 29 04 29 55 31.3200 -97.3300 251.000 122.0 79.993 3.530 -999.990 -999.990 0.800 ..P WKT 2010 07 29 04 34 55 31.3200 -97.3300 251.000 457.0 82.243 2.250 -999.990 -999.990 0.822 ..P WKT 2010 07 29 04 39 55 31.3200 -97.3300 251.000 30.0 85.321 2.920 -999.990 -999.990 0.853 ..P WKT 2010 07 29 04 44 55 31.3200 -97.3300 251.000 122.0 80.809 2.320 -999.990 -999.990 0.808 ..P WKT 2010 07 29 04 49 55 31.3200 -97.3300 251.000 457.0 74.503 2.620 -999.990 -999.990 0.745 ..P WKT 2010 07 29 05 04 55 31.3200 -97.3300 251.000 30.0 82.141 3.580 -999.990 -999.990 0.821 ..P WKT 2010 07 29 05 09 55 31.3200 -97.3300 251.000 122.0 83.663 2.770 -999.990 -999.990 0.837 ..P WKT 2010 07 29 05 14 55 31.3200 -97.3300 251.000 457.0 83.113 3.350 -999.990 -999.990 0.831 ..P WKT 2010 07 29 05 19 55 31.3200 -97.3300 251.000 30.0 86.155 3.440 -999.990 -999.990 0.862 ..P WKT 2010 07 29 05 24 55 31.3200 -97.3300 251.000 122.0 88.782 3.990 -999.990 -999.990 0.888 ..P WKT 2010 07 29 05 29 55 31.3200 -97.3300 251.000 457.0 81.050 3.220 -999.990 -999.990 0.810 ..P WKT 2010 07 29 05 39 55 31.3200 -97.3300 251.000 30.0 90.509 3.210 -999.990 -999.990 0.905 ..P WKT 2010 07 29 05 44 55 31.3200 -97.3300 251.000 122.0 82.420 2.880 -999.990 -999.990 0.824 ..P WKT 2010 07 29 05 49 55 31.3200 -97.3300 251.000 457.0 79.581 3.560 -999.990 -999.990 0.796 ..P WKT 2010 07 29 05 54 55 31.3200 -97.3300 251.000 30.0 91.665 2.480 -999.990 -999.990 0.917 ..P WKT 2010 07 29 05 59 55 31.3200 -97.3300 251.000 122.0 78.599 3.080 -999.990 -999.990 0.786 ..P WKT 2010 07 29 06 04 55 31.3200 -97.3300 251.000 457.0 82.945 2.260 -999.990 -999.990 0.829 ..P WKT 2010 07 29 06 14 55 31.3200 -97.3300 251.000 30.0 88.717 2.770 -999.990 -999.990 0.887 ..P WKT 2010 07 29 06 19 55 31.3200 -97.3300 251.000 122.0 87.101 2.600 -999.990 -999.990 0.871 ..P WKT 2010 07 29 06 24 55 31.3200 -97.3300 251.000 457.0 84.379 2.250 -999.990 -999.990 0.844 ..P WKT 2010 07 29 06 29 55 31.3200 -97.3300 251.000 30.0 87.739 2.230 -999.990 -999.990 0.877 ..P WKT 2010 07 29 06 34 55 31.3200 -97.3300 251.000 122.0 86.123 1.950 -999.990 -999.990 0.861 ..P WKT 2010 07 29 06 39 55 31.3200 -97.3300 251.000 457.0 86.166 3.140 -999.990 -999.990 0.862 ..P WKT 2010 07 29 06 49 55 31.3200 -97.3300 251.000 30.0 91.191 4.650 -999.990 -999.990 0.912 ..P WKT 2010 07 29 06 54 55 31.3200 -97.3300 251.000 122.0 79.852 1.710 -999.990 -999.990 0.799 ..P WKT 2010 07 29 06 59 55 31.3200 -97.3300 251.000 457.0 81.237 2.920 -999.990 -999.990 0.812 ..P WKT 2010 07 29 07 04 55 31.3200 -97.3300 251.000 30.0 85.391 5.370 -999.990 -999.990 0.854 ..P WKT 2010 07 29 07 09 55 31.3200 -97.3300 251.000 122.0 81.520 3.180 -999.990 -999.990 0.815 ..P WKT 2010 07 29 07 14 55 31.3200 -97.3300 251.000 457.0 76.263 2.120 -999.990 -999.990 0.763 ..P WKT 2010 07 29 07 24 55 31.3200 -97.3300 251.000 30.0 81.469 1.990 -999.990 -999.990 0.815 ..P WKT 2010 07 29 07 29 55 31.3200 -97.3300 251.000 122.0 78.643 2.500 -999.990 -999.990 0.786 ..P WKT 2010 07 29 07 34 55 31.3200 -97.3300 251.000 457.0 69.864 2.920 -999.990 -999.990 0.699 ..P WKT 2010 07 29 07 39 55 31.3200 -97.3300 251.000 30.0 90.298 3.540 -999.990 -999.990 0.903 ..P WKT 2010 07 29 07 44 55 31.3200 -97.3300 251.000 122.0 80.550 2.450 -999.990 -999.990 0.805 ..P WKT 2010 07 29 07 49 55 31.3200 -97.3300 251.000 457.0 79.801 2.740 -999.990 -999.990 0.798 ..P WKT 2010 07 29 07 59 55 31.3200 -97.3300 251.000 30.0 89.719 2.570 -999.990 -999.990 0.897 ..P WKT 2010 07 29 08 04 55 31.3200 -97.3300 251.000 122.0 87.922 3.560 -999.990 -999.990 0.879 ..P WKT 2010 07 29 08 09 55 31.3200 -97.3300 251.000 457.0 79.198 2.160 -999.990 -999.990 0.792 ..P WKT 2010 07 29 08 14 55 31.3200 -97.3300 251.000 30.0 86.682 3.380 -999.990 -999.990 0.867 ..P WKT 2010 07 29 08 19 55 31.3200 -97.3300 251.000 122.0 93.197 2.870 -999.990 -999.990 0.932 ..P WKT 2010 07 29 08 24 55 31.3200 -97.3300 251.000 457.0 79.898 2.360 -999.990 -999.990 0.799 ..P WKT 2010 07 29 08 34 55 31.3200 -97.3300 251.000 30.0 96.337 2.240 -999.990 -999.990 0.963 ..P WKT 2010 07 29 08 39 55 31.3200 -97.3300 251.000 122.0 91.847 2.500 -999.990 -999.990 0.918 ..P WKT 2010 07 29 08 44 55 31.3200 -97.3300 251.000 457.0 90.405 3.510 -999.990 -999.990 0.904 ..P WKT 2010 07 29 08 49 55 31.3200 -97.3300 251.000 30.0 99.499 3.130 -999.990 -999.990 0.995 ..P WKT 2010 07 29 08 54 55 31.3200 -97.3300 251.000 122.0 89.738 3.950 -999.990 -999.990 0.897 ..P WKT 2010 07 29 08 59 55 31.3200 -97.3300 251.000 457.0 83.026 4.180 -999.990 -999.990 0.830 ..P WKT 2010 07 29 09 09 55 31.3200 -97.3300 251.000 30.0 92.958 3.800 -999.990 -999.990 0.930 ..P WKT 2010 07 29 09 14 55 31.3200 -97.3300 251.000 122.0 85.472 5.080 -999.990 -999.990 0.855 ..P WKT 2010 07 29 09 19 55 31.3200 -97.3300 251.000 457.0 83.672 4.290 -999.990 -999.990 0.837 ..P WKT 2010 07 29 09 24 55 31.3200 -97.3300 251.000 30.0 89.779 4.010 -999.990 -999.990 0.898 ..P WKT 2010 07 29 09 29 55 31.3200 -97.3300 251.000 122.0 91.309 5.020 -999.990 -999.990 0.913 ..P WKT 2010 07 29 09 34 55 31.3200 -97.3300 251.000 457.0 82.710 4.610 -999.990 -999.990 0.827 ..P WKT 2010 07 29 09 44 55 31.3200 -97.3300 251.000 30.0 92.708 3.830 -999.990 -999.990 0.927 ..P WKT 2010 07 29 09 49 55 31.3200 -97.3300 251.000 122.0 93.267 3.610 -999.990 -999.990 0.933 ..P WKT 2010 07 29 09 54 55 31.3200 -97.3300 251.000 457.0 77.169 3.530 -999.990 -999.990 0.772 ..P WKT 2010 07 29 09 59 55 31.3200 -97.3300 251.000 30.0 83.280 3.370 -999.990 -999.990 0.833 ..P WKT 2010 07 29 10 04 55 31.3200 -97.3300 251.000 122.0 94.389 3.540 -999.990 -999.990 0.944 ..P WKT 2010 07 29 10 09 55 31.3200 -97.3300 251.000 457.0 85.507 3.590 -999.990 -999.990 0.855 ..P WKT 2010 07 29 10 19 55 31.3200 -97.3300 251.000 30.0 90.315 2.830 -999.990 -999.990 0.903 ..P WKT 2010 07 29 10 24 55 31.3200 -97.3300 251.000 122.0 87.897 2.720 -999.990 -999.990 0.879 ..P WKT 2010 07 29 10 29 55 31.3200 -97.3300 251.000 457.0 79.924 2.220 -999.990 -999.990 0.799 ..P WKT 2010 07 29 10 34 55 31.3200 -97.3300 251.000 30.0 84.173 2.170 -999.990 -999.990 0.842 ..P WKT 2010 07 29 10 39 55 31.3200 -97.3300 251.000 122.0 99.260 1.740 -999.990 -999.990 0.993 ..P WKT 2010 07 29 10 44 55 31.3200 -97.3300 251.000 457.0 90.729 3.880 -999.990 -999.990 0.907 ..P WKT 2010 07 29 10 54 55 31.3200 -97.3300 251.000 30.0 87.520 2.450 -999.990 -999.990 0.875 ..P WKT 2010 07 29 10 59 55 31.3200 -97.3300 251.000 122.0 92.289 2.190 -999.990 -999.990 0.923 ..P WKT 2010 07 29 11 04 55 31.3200 -97.3300 251.000 457.0 85.661 1.870 -999.990 -999.990 0.857 ..P WKT 2010 07 29 11 09 55 31.3200 -97.3300 251.000 30.0 95.156 1.780 -999.990 -999.990 0.952 ..P WKT 2010 07 29 11 14 55 31.3200 -97.3300 251.000 122.0 89.361 3.240 -999.990 -999.990 0.894 ..P WKT 2010 07 29 11 19 55 31.3200 -97.3300 251.000 457.0 88.014 1.790 -999.990 -999.990 0.880 ..P WKT 2010 07 29 11 29 55 31.3200 -97.3300 251.000 30.0 89.399 1.610 -999.990 -999.990 0.894 ..P WKT 2010 07 29 11 34 55 31.3200 -97.3300 251.000 122.0 94.079 2.310 -999.990 -999.990 0.941 ..P WKT 2010 07 29 11 39 55 31.3200 -97.3300 251.000 457.0 82.070 1.870 -999.990 -999.990 0.821 ..P WKT 2010 07 29 11 44 55 31.3200 -97.3300 251.000 30.0 93.566 1.640 -999.990 -999.990 0.936 ..P WKT 2010 07 29 11 49 55 31.3200 -97.3300 251.000 122.0 91.013 4.480 -999.990 -999.990 0.910 ..P WKT 2010 07 29 12 09 55 31.3200 -97.3300 251.000 457.0 81.576 3.140 -999.990 -999.990 0.816 ..P WKT 2010 07 29 12 10 25 31.3200 -97.3300 251.000 457.0 83.097 3.930 -999.990 -999.990 0.831 ..P WKT 2010 07 29 12 10 55 31.3200 -97.3300 251.000 457.0 79.888 3.810 -999.990 -999.990 0.799 ..P WKT 2010 07 29 12 11 25 31.3200 -97.3300 251.000 457.0 79.880 2.390 -999.990 -999.990 0.799 ..P WKT 2010 07 29 12 11 55 31.3200 -97.3300 251.000 457.0 81.680 2.670 -999.990 -999.990 0.817 ..P WKT 2010 07 29 12 12 25 31.3200 -97.3300 251.000 457.0 78.610 2.550 -999.990 -999.990 0.786 ..P WKT 2010 07 29 12 12 55 31.3200 -97.3300 251.000 457.0 82.080 2.590 -999.990 -999.990 0.821 ..P WKT 2010 07 29 12 13 25 31.3200 -97.3300 251.000 457.0 82.906 2.810 -999.990 -999.990 0.829 ..P WKT 2010 07 29 12 13 55 31.3200 -97.3300 251.000 457.0 79.279 2.300 -999.990 -999.990 0.793 ..P WKT 2010 07 29 12 14 25 31.3200 -97.3300 251.000 457.0 84.558 4.290 -999.990 -999.990 0.846 ..P WKT 2010 07 29 12 14 55 31.3200 -97.3300 251.000 457.0 85.523 4.410 -999.990 -999.990 0.855 ..P WKT 2010 07 29 12 19 55 31.3200 -97.3300 251.000 30.0 95.454 2.770 -999.990 -999.990 0.955 ..P WKT 2010 07 29 12 24 55 31.3200 -97.3300 251.000 122.0 96.201 2.660 -999.990 -999.990 0.962 ..P WKT 2010 07 29 12 29 55 31.3200 -97.3300 251.000 457.0 84.844 2.620 -999.990 -999.990 0.848 ..P WKT 2010 07 29 12 34 55 31.3200 -97.3300 251.000 30.0 95.192 4.580 -999.990 -999.990 0.952 ..P WKT 2010 07 29 12 39 55 31.3200 -97.3300 251.000 122.0 98.443 3.410 -999.990 -999.990 0.984 ..P WKT 2010 07 29 12 44 55 31.3200 -97.3300 251.000 457.0 88.478 2.760 -999.990 -999.990 0.885 ..P WKT 2010 07 29 12 54 55 31.3200 -97.3300 251.000 30.0 87.168 4.370 -999.990 -999.990 0.872 ..P WKT 2010 07 29 12 59 55 31.3200 -97.3300 251.000 122.0 95.685 2.900 -999.990 -999.990 0.957 ..P WKT 2010 07 29 13 04 55 31.3200 -97.3300 251.000 457.0 86.810 2.850 -999.990 -999.990 0.868 ..P WKT 2010 07 29 13 09 55 31.3200 -97.3300 251.000 30.0 95.605 2.650 -999.990 -999.990 0.956 ..P WKT 2010 07 29 13 14 55 31.3200 -97.3300 251.000 122.0 101.479 2.350 -999.990 -999.990 1.015 ..P WKT 2010 07 29 13 19 55 31.3200 -97.3300 251.000 457.0 88.291 2.220 -999.990 -999.990 0.883 ..P WKT 2010 07 29 13 29 55 31.3200 -97.3300 251.000 30.0 101.885 3.480 -999.990 -999.990 1.019 ..P WKT 2010 07 29 13 34 55 31.3200 -97.3300 251.000 122.0 103.624 2.130 -999.990 -999.990 1.036 ..P WKT 2010 07 29 13 39 55 31.3200 -97.3300 251.000 457.0 90.060 3.460 -999.990 -999.990 0.901 ..P WKT 2010 07 29 13 44 55 31.3200 -97.3300 251.000 30.0 101.816 5.290 -999.990 -999.990 1.018 ..P WKT 2010 07 29 13 49 55 31.3200 -97.3300 251.000 122.0 95.764 2.470 -999.990 -999.990 0.958 ..P WKT 2010 07 29 13 54 55 31.3200 -97.3300 251.000 457.0 85.261 2.830 -999.990 -999.990 0.853 ..P WKT 2010 07 29 14 04 55 31.3200 -97.3300 251.000 30.0 92.872 4.010 -999.990 -999.990 0.929 ..P WKT 2010 07 29 14 09 55 31.3200 -97.3300 251.000 122.0 95.128 3.710 -999.990 -999.990 0.951 ..P WKT 2010 07 29 14 14 55 31.3200 -97.3300 251.000 457.0 88.759 2.710 -999.990 -999.990 0.888 ..P WKT 2010 07 29 14 19 55 31.3200 -97.3300 251.000 30.0 89.345 2.390 -999.990 -999.990 0.893 ..P WKT 2010 07 29 14 24 55 31.3200 -97.3300 251.000 122.0 91.601 2.140 -999.990 -999.990 0.916 ..P WKT 2010 07 29 14 29 55 31.3200 -97.3300 251.000 457.0 85.231 2.060 -999.990 -999.990 0.852 ..P WKT 2010 07 29 14 39 55 31.3200 -97.3300 251.000 30.0 93.398 3.640 -999.990 -999.990 0.934 ..P WKT 2010 07 29 14 44 55 31.3200 -97.3300 251.000 122.0 103.205 3.680 -999.990 -999.990 1.032 ..P WKT 2010 07 29 14 49 55 31.3200 -97.3300 251.000 457.0 88.808 3.110 -999.990 -999.990 0.888 ..P WKT 2010 07 29 14 54 55 31.3200 -97.3300 251.000 30.0 105.013 4.180 -999.990 -999.990 1.050 ..P WKT 2010 07 29 14 59 55 31.3200 -97.3300 251.000 122.0 114.541 3.630 -999.990 -999.990 1.145 ..P WKT 2010 07 29 15 04 55 31.3200 -97.3300 251.000 457.0 97.363 3.120 -999.990 -999.990 0.974 ..P WKT 2010 07 29 15 14 55 31.3200 -97.3300 251.000 30.0 104.099 2.640 -999.990 -999.990 1.041 ..P WKT 2010 07 29 15 19 55 31.3200 -97.3300 251.000 122.0 110.209 3.940 -999.990 -999.990 1.102 ..P WKT 2010 07 29 15 24 55 31.3200 -97.3300 251.000 457.0 99.071 4.110 -999.990 -999.990 0.991 ..P WKT 2010 07 29 15 29 55 31.3200 -97.3300 251.000 30.0 97.253 4.220 -999.990 -999.990 0.973 ..P WKT 2010 07 29 15 34 55 31.3200 -97.3300 251.000 122.0 100.442 3.840 -999.990 -999.990 1.004 ..P WKT 2010 07 29 15 39 55 31.3200 -97.3300 251.000 457.0 95.146 2.590 -999.990 -999.990 0.951 ..P WKT 2010 07 29 15 49 55 31.3200 -97.3300 251.000 30.0 87.973 2.550 -999.990 -999.990 0.880 ..P WKT 2010 07 29 15 54 55 31.3200 -97.3300 251.000 122.0 105.985 4.260 -999.990 -999.990 1.060 ..P WKT 2010 07 29 15 59 55 31.3200 -97.3300 251.000 457.0 90.060 3.600 -999.990 -999.990 0.901 ..P WKT 2010 07 29 16 04 55 31.3200 -97.3300 251.000 30.0 94.163 3.590 -999.990 -999.990 0.942 ..P WKT 2010 07 29 16 09 55 31.3200 -97.3300 251.000 122.0 101.464 3.410 -999.990 -999.990 1.015 ..P WKT 2010 07 29 16 14 55 31.3200 -97.3300 251.000 457.0 99.726 3.750 -999.990 -999.990 0.997 ..P WKT 2010 07 29 16 24 55 31.3200 -97.3300 251.000 30.0 86.831 3.170 -999.990 -999.990 0.868 ..P WKT 2010 07 29 16 29 55 31.3200 -97.3300 251.000 122.0 100.709 3.780 -999.990 -999.990 1.007 ..P WKT 2010 07 29 16 34 55 31.3200 -97.3300 251.000 457.0 88.163 4.920 -999.990 -999.990 0.882 ..P WKT 2010 07 29 16 39 55 31.3200 -97.3300 251.000 30.0 87.159 2.800 -999.990 -999.990 0.872 ..P WKT 2010 07 29 16 44 55 31.3200 -97.3300 251.000 122.0 100.063 4.970 -999.990 -999.990 1.001 ..P WKT 2010 07 29 16 49 55 31.3200 -97.3300 251.000 457.0 87.795 2.580 -999.990 -999.990 0.878 ..P WKT 2010 07 29 17 04 55 31.3200 -97.3300 251.000 30.0 93.899 2.890 -999.990 -999.990 0.939 ..P WKT 2010 07 29 17 09 55 31.3200 -97.3300 251.000 122.0 93.628 3.200 -999.990 -999.990 0.936 ..P WKT 2010 07 29 17 14 55 31.3200 -97.3300 251.000 457.0 89.325 2.300 -999.990 -999.990 0.893 ..P WKT 2010 07 29 17 19 55 31.3200 -97.3300 251.000 30.0 88.358 2.910 -999.990 -999.990 0.884 ..P WKT 2010 07 29 17 24 55 31.3200 -97.3300 251.000 122.0 101.438 2.920 -999.990 -999.990 1.014 ..P WKT 2010 07 29 17 29 55 31.3200 -97.3300 251.000 457.0 89.903 4.260 -999.990 -999.990 0.899 ..P WKT 2010 07 29 17 39 55 31.3200 -97.3300 251.000 30.0 87.438 4.500 -999.990 -999.990 0.874 ..P WKT 2010 07 29 17 44 55 31.3200 -97.3300 251.000 122.0 94.977 3.030 -999.990 -999.990 0.950 ..P WKT 2010 07 29 17 49 55 31.3200 -97.3300 251.000 457.0 92.781 3.060 -999.990 -999.990 0.928 ..P WKT 2010 07 29 17 54 55 31.3200 -97.3300 251.000 30.0 83.077 3.190 -999.990 -999.990 0.831 ..P WKT 2010 07 29 17 59 55 31.3200 -97.3300 251.000 122.0 101.462 2.690 -999.990 -999.990 1.015 ..P WKT 2010 07 29 18 04 55 31.3200 -97.3300 251.000 457.0 94.261 3.200 -999.990 -999.990 0.943 ..P WKT 2010 07 29 18 14 55 31.3200 -97.3300 251.000 30.0 96.585 3.410 -999.990 -999.990 0.966 ..P WKT 2010 07 29 18 19 55 31.3200 -97.3300 251.000 122.0 99.714 3.030 -999.990 -999.990 0.997 ..P WKT 2010 07 29 18 24 55 31.3200 -97.3300 251.000 457.0 94.500 2.440 -999.990 -999.990 0.945 ..P WKT 2010 07 29 18 29 55 31.3200 -97.3300 251.000 30.0 91.510 3.000 -999.990 -999.990 0.915 ..P WKT 2010 07 29 18 34 55 31.3200 -97.3300 251.000 122.0 105.485 3.680 -999.990 -999.990 1.055 ..P WKT 2010 07 29 18 39 55 31.3200 -97.3300 251.000 457.0 93.040 2.940 -999.990 -999.990 0.930 ..P WKT 2010 07 29 18 49 55 31.3200 -97.3300 251.000 30.0 97.707 4.390 -999.990 -999.990 0.977 ..P WKT 2010 07 29 18 54 55 31.3200 -97.3300 251.000 122.0 100.081 4.040 -999.990 -999.990 1.001 ..P WKT 2010 07 29 18 59 55 31.3200 -97.3300 251.000 457.0 90.497 3.730 -999.990 -999.990 0.905 ..P WKT 2010 07 29 19 04 55 31.3200 -97.3300 251.000 30.0 87.865 4.260 -999.990 -999.990 0.879 ..P WKT 2010 07 29 19 09 55 31.3200 -97.3300 251.000 122.0 98.859 4.360 -999.990 -999.990 0.989 ..P WKT 2010 07 29 19 14 55 31.3200 -97.3300 251.000 457.0 88.719 4.980 -999.990 -999.990 0.887 ..P WKT 2010 07 29 19 24 55 31.3200 -97.3300 251.000 30.0 84.826 6.370 -999.990 -999.990 0.848 ..P WKT 2010 07 29 19 29 55 31.3200 -97.3300 251.000 122.0 92.324 5.110 -999.990 -999.990 0.923 ..P WKT 2010 07 29 19 34 55 31.3200 -97.3300 251.000 457.0 88.004 4.510 -999.990 -999.990 0.880 ..P WKT 2010 07 29 19 39 55 31.3200 -97.3300 251.000 30.0 89.941 4.370 -999.990 -999.990 0.899 ..P WKT 2010 07 29 19 44 55 31.3200 -97.3300 251.000 122.0 100.219 4.150 -999.990 -999.990 1.002 ..P WKT 2010 07 29 19 49 55 31.3200 -97.3300 251.000 457.0 79.493 3.980 -999.990 -999.990 0.795 ..P WKT 2010 07 29 19 59 55 31.3200 -97.3300 251.000 30.0 81.301 3.660 -999.990 -999.990 0.813 ..P WKT 2010 07 29 20 04 55 31.3200 -97.3300 251.000 122.0 88.402 3.860 -999.990 -999.990 0.884 ..P WKT 2010 07 29 20 09 55 31.3200 -97.3300 251.000 457.0 85.492 2.950 -999.990 -999.990 0.855 ..P WKT 2010 07 29 20 14 55 31.3200 -97.3300 251.000 30.0 88.004 4.370 -999.990 -999.990 0.880 ..P WKT 2010 07 29 20 19 55 31.3200 -97.3300 251.000 122.0 97.328 3.430 -999.990 -999.990 0.973 ..P WKT 2010 07 29 20 24 55 31.3200 -97.3300 251.000 457.0 88.580 3.280 -999.990 -999.990 0.886 ..P WKT 2010 07 29 20 34 55 31.3200 -97.3300 251.000 30.0 91.500 4.410 -999.990 -999.990 0.915 ..P WKT 2010 07 29 20 39 55 31.3200 -97.3300 251.000 122.0 98.719 3.250 -999.990 -999.990 0.987 ..P WKT 2010 07 29 20 44 55 31.3200 -97.3300 251.000 457.0 94.399 2.890 -999.990 -999.990 0.944 ..P WKT 2010 07 29 20 49 55 31.3200 -97.3300 251.000 30.0 95.223 3.430 -999.990 -999.990 0.952 ..P WKT 2010 07 29 20 54 55 31.3200 -97.3300 251.000 122.0 101.330 3.860 -999.990 -999.990 1.013 ..P WKT 2010 07 29 20 59 55 31.3200 -97.3300 251.000 457.0 93.257 4.870 -999.990 -999.990 0.933 ..P WKT 2010 07 29 21 09 55 31.3200 -97.3300 251.000 30.0 95.739 4.500 -999.990 -999.990 0.957 ..P WKT 2010 07 29 21 14 55 31.3200 -97.3300 251.000 122.0 106.294 3.910 -999.990 -999.990 1.063 ..P WKT 2010 07 29 21 19 55 31.3200 -97.3300 251.000 457.0 82.236 3.310 -999.990 -999.990 0.822 ..P WKT 2010 07 29 21 24 55 31.3200 -97.3300 251.000 30.0 90.984 3.790 -999.990 -999.990 0.910 ..P WKT 2010 07 29 21 29 55 31.3200 -97.3300 251.000 122.0 93.614 4.100 -999.990 -999.990 0.936 ..P WKT 2010 07 29 21 34 55 31.3200 -97.3300 251.000 457.0 85.125 3.150 -999.990 -999.990 0.851 ..P WKT 2010 07 29 21 44 55 31.3200 -97.3300 251.000 30.0 92.830 3.050 -999.990 -999.990 0.928 ..P WKT 2010 07 29 21 49 55 31.3200 -97.3300 251.000 122.0 95.402 3.190 -999.990 -999.990 0.954 ..P WKT 2010 07 29 21 54 55 31.3200 -97.3300 251.000 457.0 82.127 2.660 -999.990 -999.990 0.821 ..P WKT 2010 07 29 21 59 55 31.3200 -97.3300 251.000 30.0 86.645 2.290 -999.990 -999.990 0.866 ..P WKT 2010 07 29 22 04 55 31.3200 -97.3300 251.000 122.0 97.557 2.680 -999.990 -999.990 0.976 ..P WKT 2010 07 29 22 09 55 31.3200 -97.3300 251.000 457.0 89.564 3.250 -999.990 -999.990 0.896 ..P WKT 2010 07 29 22 19 55 31.3200 -97.3300 251.000 30.0 80.410 2.440 -999.990 -999.990 0.804 ..P WKT 2010 07 29 22 24 55 31.3200 -97.3300 251.000 122.0 92.592 3.360 -999.990 -999.990 0.926 ..P WKT 2010 07 29 22 29 55 31.3200 -97.3300 251.000 457.0 82.257 2.510 -999.990 -999.990 0.823 ..P WKT 2010 07 29 22 34 55 31.3200 -97.3300 251.000 30.0 86.933 2.900 -999.990 -999.990 0.869 ..P WKT 2010 07 29 22 39 55 31.3200 -97.3300 251.000 122.0 97.447 3.450 -999.990 -999.990 0.974 ..P WKT 2010 07 29 22 44 55 31.3200 -97.3300 251.000 457.0 90.448 3.120 -999.990 -999.990 0.904 ..P WKT 2010 07 29 22 54 55 31.3200 -97.3300 251.000 30.0 85.166 4.630 -999.990 -999.990 0.852 ..P WKT 2010 07 29 22 59 55 31.3200 -97.3300 251.000 122.0 89.386 3.470 -999.990 -999.990 0.894 ..P WKT 2010 07 29 23 04 55 31.3200 -97.3300 251.000 457.0 84.710 2.580 -999.990 -999.990 0.847 ..P WKT 2010 07 29 23 09 55 31.3200 -97.3300 251.000 30.0 88.373 3.750 -999.990 -999.990 0.884 ..P WKT 2010 07 29 23 14 55 31.3200 -97.3300 251.000 122.0 89.257 2.980 -999.990 -999.990 0.893 ..P WKT 2010 07 29 23 19 55 31.3200 -97.3300 251.000 457.0 81.384 3.120 -999.990 -999.990 0.814 ..P WKT 2010 07 29 23 29 55 31.3200 -97.3300 251.000 30.0 85.055 3.000 -999.990 -999.990 0.851 ..P WKT 2010 07 29 23 34 55 31.3200 -97.3300 251.000 122.0 94.235 5.730 -999.990 -999.990 0.942 ..P WKT 2010 07 29 23 39 55 31.3200 -97.3300 251.000 457.0 84.931 3.310 -999.990 -999.990 0.849 ..P WKT 2010 07 29 23 44 55 31.3200 -97.3300 251.000 30.0 80.352 5.800 -999.990 -999.990 0.804 ..P WKT 2010 07 29 23 49 55 31.3200 -97.3300 251.000 122.0 89.949 3.570 -999.990 -999.990 0.899 ..P WKT 2010 07 30 00 09 55 31.3200 -97.3300 251.000 457.0 88.819 2.830 -999.990 -999.990 0.888 ..P WKT 2010 07 30 00 10 25 31.3200 -97.3300 251.000 457.0 89.088 2.820 -999.990 -999.990 0.891 ..P WKT 2010 07 30 00 10 55 31.3200 -97.3300 251.000 457.0 90.192 3.580 -999.990 -999.990 0.902 ..P WKT 2010 07 30 00 11 25 31.3200 -97.3300 251.000 457.0 85.598 2.950 -999.990 -999.990 0.856 ..P WKT 2010 07 30 00 11 55 31.3200 -97.3300 251.000 457.0 85.312 3.090 -999.990 -999.990 0.853 ..P WKT 2010 07 30 00 12 25 31.3200 -97.3300 251.000 457.0 83.775 2.910 -999.990 -999.990 0.838 ..P WKT 2010 07 30 00 12 55 31.3200 -97.3300 251.000 457.0 85.296 2.680 -999.990 -999.990 0.853 ..P WKT 2010 07 30 00 13 25 31.3200 -97.3300 251.000 457.0 89.457 3.240 -999.990 -999.990 0.895 ..P WKT 2010 07 30 00 13 55 31.3200 -97.3300 251.000 457.0 89.865 2.700 -999.990 -999.990 0.899 ..P WKT 2010 07 30 00 14 25 31.3200 -97.3300 251.000 457.0 91.386 2.890 -999.990 -999.990 0.914 ..P WKT 2010 07 30 00 14 55 31.3200 -97.3300 251.000 457.0 88.598 2.540 -999.990 -999.990 0.886 ..P WKT 2010 07 30 00 19 55 31.3200 -97.3300 251.000 30.0 82.680 3.160 -999.990 -999.990 0.827 ..P WKT 2010 07 30 00 24 55 31.3200 -97.3300 251.000 122.0 97.470 3.080 -999.990 -999.990 0.975 ..P WKT 2010 07 30 00 29 55 31.3200 -97.3300 251.000 457.0 84.186 3.200 -999.990 -999.990 0.842 ..P WKT 2010 07 30 00 34 55 31.3200 -97.3300 251.000 30.0 86.189 3.100 -999.990 -999.990 0.862 ..P WKT 2010 07 30 00 39 55 31.3200 -97.3300 251.000 122.0 88.054 2.710 -999.990 -999.990 0.881 ..P WKT 2010 07 30 00 44 55 31.3200 -97.3300 251.000 457.0 87.417 2.550 -999.990 -999.990 0.874 ..P WKT 2010 07 30 00 54 55 31.3200 -97.3300 251.000 30.0 85.064 3.180 -999.990 -999.990 0.851 ..P WKT 2010 07 30 00 59 55 31.3200 -97.3300 251.000 122.0 91.409 3.070 -999.990 -999.990 0.914 ..P WKT 2010 07 30 01 04 55 31.3200 -97.3300 251.000 457.0 88.025 3.250 -999.990 -999.990 0.880 ..P WKT 2010 07 30 01 09 55 31.3200 -97.3300 251.000 30.0 89.228 4.470 -999.990 -999.990 0.892 ..P WKT 2010 07 30 01 14 55 31.3200 -97.3300 251.000 122.0 100.994 4.150 -999.990 -999.990 1.010 ..P WKT 2010 07 30 01 19 55 31.3200 -97.3300 251.000 457.0 83.989 4.640 -999.990 -999.990 0.840 ..P WKT 2010 07 30 01 29 55 31.3200 -97.3300 251.000 30.0 89.374 4.590 -999.990 -999.990 0.894 ..P WKT 2010 07 30 01 34 55 31.3200 -97.3300 251.000 122.0 97.447 6.700 -999.990 -999.990 0.974 ..P WKT 2010 07 30 01 39 55 31.3200 -97.3300 251.000 457.0 94.122 3.830 -999.990 -999.990 0.941 ..P WKT 2010 07 30 01 44 55 31.3200 -97.3300 251.000 30.0 91.632 3.250 -999.990 -999.990 0.916 ..P WKT 2010 07 30 01 49 55 31.3200 -97.3300 251.000 122.0 93.868 3.030 -999.990 -999.990 0.939 ..P WKT 2010 07 30 01 54 55 31.3200 -97.3300 251.000 457.0 93.323 3.150 -999.990 -999.990 0.933 ..P WKT 2010 07 30 02 04 55 31.3200 -97.3300 251.000 30.0 95.610 3.380 -999.990 -999.990 0.956 ..P WKT 2010 07 30 02 09 55 31.3200 -97.3300 251.000 122.0 88.989 2.890 -999.990 -999.990 0.890 ..P WKT 2010 07 30 02 14 55 31.3200 -97.3300 251.000 457.0 86.816 3.150 -999.990 -999.990 0.868 ..P WKT 2010 07 30 02 19 55 31.3200 -97.3300 251.000 30.0 99.379 2.950 -999.990 -999.990 0.994 ..P WKT 2010 07 30 02 24 55 31.3200 -97.3300 251.000 122.0 89.143 3.850 -999.990 -999.990 0.891 ..P WKT 2010 07 30 02 29 55 31.3200 -97.3300 251.000 457.0 90.585 2.940 -999.990 -999.990 0.906 ..P WKT 2010 07 30 02 39 55 31.3200 -97.3300 251.000 30.0 100.299 2.720 -999.990 -999.990 1.003 ..P WKT 2010 07 30 02 44 55 31.3200 -97.3300 251.000 122.0 89.110 3.760 -999.990 -999.990 0.891 ..P WKT 2010 07 30 02 49 55 31.3200 -97.3300 251.000 457.0 80.423 2.640 -999.990 -999.990 0.804 ..P WKT 2010 07 30 02 54 55 31.3200 -97.3300 251.000 30.0 108.994 2.590 -999.990 -999.990 1.090 ..P WKT 2010 07 30 02 59 55 31.3200 -97.3300 251.000 122.0 87.516 2.680 -999.990 -999.990 0.875 ..P WKT 2010 07 30 03 04 55 31.3200 -97.3300 251.000 457.0 77.716 3.320 -999.990 -999.990 0.777 ..P WKT 2010 07 30 03 14 55 31.3200 -97.3300 251.000 30.0 138.277 4.730 -999.990 -999.990 1.383 ..P WKT 2010 07 30 03 19 55 31.3200 -97.3300 251.000 122.0 87.125 3.260 -999.990 -999.990 0.871 ..P WKT 2010 07 30 03 24 55 31.3200 -97.3300 251.000 457.0 86.720 3.380 -999.990 -999.990 0.867 ..P WKT 2010 07 30 03 29 55 31.3200 -97.3300 251.000 30.0 118.570 2.840 -999.990 -999.990 1.186 ..P WKT 2010 07 30 03 34 55 31.3200 -97.3300 251.000 122.0 87.854 2.530 -999.990 -999.990 0.879 ..P WKT 2010 07 30 03 39 55 31.3200 -97.3300 251.000 457.0 93.983 2.980 -999.990 -999.990 0.940 ..P WKT 2010 07 30 03 49 55 31.3200 -97.3300 251.000 30.0 102.906 3.150 -999.990 -999.990 1.029 ..P WKT 2010 07 30 03 54 55 31.3200 -97.3300 251.000 122.0 87.205 2.700 -999.990 -999.990 0.872 ..P WKT 2010 07 30 03 59 55 31.3200 -97.3300 251.000 457.0 87.356 3.760 -999.990 -999.990 0.874 ..P WKT 2010 07 30 04 04 55 31.3200 -97.3300 251.000 30.0 92.652 3.300 -999.990 -999.990 0.927 ..P WKT 2010 07 30 04 09 55 31.3200 -97.3300 251.000 122.0 96.695 3.110 -999.990 -999.990 0.967 ..P WKT 2010 07 30 04 14 55 31.3200 -97.3300 251.000 457.0 88.642 3.310 -999.990 -999.990 0.886 ..P WKT 2010 07 30 04 24 55 31.3200 -97.3300 251.000 30.0 92.360 3.120 -999.990 -999.990 0.924 ..P WKT 2010 07 30 04 29 55 31.3200 -97.3300 251.000 122.0 95.927 2.500 -999.990 -999.990 0.959 ..P WKT 2010 07 30 04 34 55 31.3200 -97.3300 251.000 457.0 110.341 3.770 -999.990 -999.990 1.103 ..P WKT 2010 07 30 04 39 55 31.3200 -97.3300 251.000 30.0 96.526 5.160 -999.990 -999.990 0.965 ..P WKT 2010 07 30 04 44 55 31.3200 -97.3300 251.000 122.0 94.114 3.880 -999.990 -999.990 0.941 ..P WKT 2010 07 30 04 49 55 31.3200 -97.3300 251.000 457.0 101.159 3.840 -999.990 -999.990 1.012 ..P WKT 2010 07 30 05 04 55 31.3200 -97.3300 251.000 30.0 94.459 3.960 -999.990 -999.990 0.945 ..P WKT 2010 07 30 05 09 55 31.3200 -97.3300 251.000 122.0 86.752 4.630 -999.990 -999.990 0.868 ..P WKT 2010 07 30 05 14 55 31.3200 -97.3300 251.000 457.0 87.112 5.090 -999.990 -999.990 0.871 ..P WKT 2010 07 30 05 19 55 31.3200 -97.3300 251.000 30.0 90.531 4.890 -999.990 -999.990 0.905 ..P WKT 2010 07 30 05 24 55 31.3200 -97.3300 251.000 122.0 88.387 4.070 -999.990 -999.990 0.884 ..P WKT 2010 07 30 05 29 55 31.3200 -97.3300 251.000 457.0 84.017 2.870 -999.990 -999.990 0.840 ..P WKT 2010 07 30 05 39 55 31.3200 -97.3300 251.000 30.0 104.733 3.030 -999.990 -999.990 1.047 ..P WKT 2010 07 30 05 44 55 31.3200 -97.3300 251.000 122.0 92.823 4.330 -999.990 -999.990 0.928 ..P WKT 2010 07 30 05 49 55 31.3200 -97.3300 251.000 457.0 79.245 5.930 -999.990 -999.990 0.792 ..P WKT 2010 07 30 05 54 55 31.3200 -97.3300 251.000 30.0 93.761 4.890 -999.990 -999.990 0.938 ..P WKT 2010 07 30 05 59 55 31.3200 -97.3300 251.000 122.0 86.023 3.250 -999.990 -999.990 0.860 ..P WKT 2010 07 30 06 04 55 31.3200 -97.3300 251.000 457.0 83.015 2.910 -999.990 -999.990 0.830 ..P WKT 2010 07 30 06 14 55 31.3200 -97.3300 251.000 30.0 86.058 4.700 -999.990 -999.990 0.861 ..P WKT 2010 07 30 06 19 55 31.3200 -97.3300 251.000 122.0 94.613 3.350 -999.990 -999.990 0.946 ..P WKT 2010 07 30 06 24 55 31.3200 -97.3300 251.000 457.0 83.974 4.030 -999.990 -999.990 0.840 ..P WKT 2010 07 30 06 29 55 31.3200 -97.3300 251.000 30.0 85.575 2.540 -999.990 -999.990 0.856 ..P WKT 2010 07 30 06 34 55 31.3200 -97.3300 251.000 122.0 90.237 2.070 -999.990 -999.990 0.902 ..P WKT 2010 07 30 06 39 55 31.3200 -97.3300 251.000 457.0 86.552 2.120 -999.990 -999.990 0.866 ..P WKT 2010 07 30 06 49 55 31.3200 -97.3300 251.000 30.0 93.808 1.860 -999.990 -999.990 0.938 ..P WKT 2010 07 30 06 54 55 31.3200 -97.3300 251.000 122.0 91.675 1.650 -999.990 -999.990 0.917 ..P WKT 2010 07 30 06 59 55 31.3200 -97.3300 251.000 457.0 72.291 1.770 -999.990 -999.990 0.723 ..P WKT 2010 07 30 07 04 55 31.3200 -97.3300 251.000 30.0 82.954 3.240 -999.990 -999.990 0.830 ..P WKT 2010 07 30 07 09 55 31.3200 -97.3300 251.000 122.0 85.827 5.450 -999.990 -999.990 0.858 ..P WKT 2010 07 30 07 14 55 31.3200 -97.3300 251.000 457.0 77.015 2.660 -999.990 -999.990 0.770 ..P WKT 2010 07 30 07 24 55 31.3200 -97.3300 251.000 30.0 87.630 2.720 -999.990 -999.990 0.876 ..P WKT 2010 07 30 07 29 55 31.3200 -97.3300 251.000 122.0 93.008 3.000 -999.990 -999.990 0.930 ..P WKT 2010 07 30 07 34 55 31.3200 -97.3300 251.000 457.0 77.657 2.260 -999.990 -999.990 0.777 ..P WKT 2010 07 30 07 39 55 31.3200 -97.3300 251.000 30.0 80.669 2.670 -999.990 -999.990 0.807 ..P WKT 2010 07 30 07 44 55 31.3200 -97.3300 251.000 122.0 97.037 4.260 -999.990 -999.990 0.970 ..P WKT 2010 07 30 07 49 55 31.3200 -97.3300 251.000 457.0 82.521 2.320 -999.990 -999.990 0.825 ..P WKT 2010 07 30 07 59 55 31.3200 -97.3300 251.000 30.0 83.657 2.570 -999.990 -999.990 0.837 ..P WKT 2010 07 30 08 04 55 31.3200 -97.3300 251.000 122.0 95.554 2.780 -999.990 -999.990 0.956 ..P WKT 2010 07 30 08 09 55 31.3200 -97.3300 251.000 457.0 83.799 3.090 -999.990 -999.990 0.838 ..P WKT 2010 07 30 08 14 55 31.3200 -97.3300 251.000 30.0 86.096 4.290 -999.990 -999.990 0.861 ..P WKT 2010 07 30 08 19 55 31.3200 -97.3300 251.000 122.0 90.202 3.070 -999.990 -999.990 0.902 ..P WKT 2010 07 30 08 24 55 31.3200 -97.3300 251.000 457.0 82.900 4.610 -999.990 -999.990 0.829 ..P WKT 2010 07 30 08 34 55 31.3200 -97.3300 251.000 30.0 85.407 3.720 -999.990 -999.990 0.854 ..P WKT 2010 07 30 08 39 55 31.3200 -97.3300 251.000 122.0 94.800 4.190 -999.990 -999.990 0.948 ..P WKT 2010 07 30 08 44 55 31.3200 -97.3300 251.000 457.0 83.045 2.940 -999.990 -999.990 0.830 ..P WKT 2010 07 30 08 49 55 31.3200 -97.3300 251.000 30.0 93.273 2.880 -999.990 -999.990 0.933 ..P WKT 2010 07 30 08 54 55 31.3200 -97.3300 251.000 122.0 94.319 3.930 -999.990 -999.990 0.943 ..P WKT 2010 07 30 08 59 55 31.3200 -97.3300 251.000 457.0 74.215 3.090 -999.990 -999.990 0.742 ..P WKT 2010 07 30 09 09 55 31.3200 -97.3300 251.000 30.0 84.713 4.660 -999.990 -999.990 0.847 ..P WKT 2010 07 30 09 14 55 31.3200 -97.3300 251.000 122.0 89.853 3.380 -999.990 -999.990 0.899 ..P WKT 2010 07 30 09 19 55 31.3200 -97.3300 251.000 457.0 72.730 2.310 -999.990 -999.990 0.727 ..P WKT 2010 07 30 09 24 55 31.3200 -97.3300 251.000 30.0 82.601 3.180 -999.990 -999.990 0.826 ..P WKT 2010 07 30 09 29 55 31.3200 -97.3300 251.000 122.0 91.359 3.010 -999.990 -999.990 0.914 ..P WKT 2010 07 30 09 34 55 31.3200 -97.3300 251.000 457.0 72.565 2.350 -999.990 -999.990 0.726 ..P WKT 2010 07 30 09 44 55 31.3200 -97.3300 251.000 30.0 85.509 1.900 -999.990 -999.990 0.855 ..P WKT 2010 07 30 09 49 55 31.3200 -97.3300 251.000 122.0 91.087 2.460 -999.990 -999.990 0.911 ..P WKT 2010 07 30 09 54 55 31.3200 -97.3300 251.000 457.0 70.225 1.790 -999.990 -999.990 0.702 ..P WKT 2010 07 30 09 59 55 31.3200 -97.3300 251.000 30.0 85.822 2.270 -999.990 -999.990 0.858 ..P WKT 2010 07 30 10 04 55 31.3200 -97.3300 251.000 122.0 85.833 1.900 -999.990 -999.990 0.858 ..P WKT 2010 07 30 10 09 55 31.3200 -97.3300 251.000 457.0 73.042 1.630 -999.990 -999.990 0.730 ..P WKT 2010 07 30 10 19 55 31.3200 -97.3300 251.000 30.0 90.720 2.010 -999.990 -999.990 0.907 ..P WKT 2010 07 30 10 24 55 31.3200 -97.3300 251.000 122.0 88.624 2.070 -999.990 -999.990 0.886 ..P WKT 2010 07 30 10 29 55 31.3200 -97.3300 251.000 457.0 72.611 2.380 -999.990 -999.990 0.726 ..P WKT 2010 07 30 10 34 55 31.3200 -97.3300 251.000 30.0 88.886 2.630 -999.990 -999.990 0.889 ..P WKT 2010 07 30 10 39 55 31.3200 -97.3300 251.000 122.0 95.697 2.970 -999.990 -999.990 0.957 ..P WKT 2010 07 30 10 44 55 31.3200 -97.3300 251.000 457.0 76.901 4.200 -999.990 -999.990 0.769 ..P WKT 2010 07 30 10 54 55 31.3200 -97.3300 251.000 30.0 89.389 4.210 -999.990 -999.990 0.894 ..P WKT 2010 07 30 10 59 55 31.3200 -97.3300 251.000 122.0 84.212 3.000 -999.990 -999.990 0.842 ..P WKT 2010 07 30 11 04 55 31.3200 -97.3300 251.000 457.0 71.379 2.350 -999.990 -999.990 0.714 ..P WKT 2010 07 30 11 09 55 31.3200 -97.3300 251.000 30.0 86.522 3.420 -999.990 -999.990 0.865 ..P WKT 2010 07 30 11 14 55 31.3200 -97.3300 251.000 122.0 87.050 3.370 -999.990 -999.990 0.870 ..P WKT 2010 07 30 11 19 55 31.3200 -97.3300 251.000 457.0 69.485 2.180 -999.990 -999.990 0.695 ..P WKT 2010 07 30 11 29 55 31.3200 -97.3300 251.000 30.0 89.580 2.390 -999.990 -999.990 0.896 ..P WKT 2010 07 30 11 34 55 31.3200 -97.3300 251.000 122.0 84.929 2.460 -999.990 -999.990 0.849 ..P WKT 2010 07 30 11 39 55 31.3200 -97.3300 251.000 457.0 71.787 1.850 -999.990 -999.990 0.718 ..P WKT 2010 07 30 11 44 55 31.3200 -97.3300 251.000 30.0 89.685 3.270 -999.990 -999.990 0.897 ..P WKT 2010 07 30 11 49 55 31.3200 -97.3300 251.000 122.0 88.513 2.130 -999.990 -999.990 0.885 ..P WKT 2010 07 30 12 09 55 31.3200 -97.3300 251.000 457.0 76.740 2.760 -999.990 -999.990 0.767 ..P WKT 2010 07 30 12 10 25 31.3200 -97.3300 251.000 457.0 76.492 2.610 -999.990 -999.990 0.765 ..P WKT 2010 07 30 12 10 55 31.3200 -97.3300 251.000 457.0 69.006 4.830 -999.990 -999.990 0.690 ..P WKT 2010 07 30 12 11 25 31.3200 -97.3300 251.000 457.0 66.670 3.910 -999.990 -999.990 0.667 ..P WKT 2010 07 30 12 11 55 31.3200 -97.3300 251.000 457.0 71.850 2.950 -999.990 -999.990 0.718 ..P WKT 2010 07 30 12 12 25 31.3200 -97.3300 251.000 457.0 71.740 2.490 -999.990 -999.990 0.717 ..P WKT 2010 07 30 12 12 55 31.3200 -97.3300 251.000 457.0 70.797 2.490 -999.990 -999.990 0.708 ..P WKT 2010 07 30 12 13 25 31.3200 -97.3300 251.000 457.0 73.053 2.790 -999.990 -999.990 0.731 ..P WKT 2010 07 30 12 13 55 31.3200 -97.3300 251.000 457.0 72.944 2.600 -999.990 -999.990 0.729 ..P WKT 2010 07 30 12 14 25 31.3200 -97.3300 251.000 457.0 73.948 2.820 -999.990 -999.990 0.739 ..P WKT 2010 07 30 12 14 55 31.3200 -97.3300 251.000 457.0 69.942 2.440 -999.990 -999.990 0.699 ..P WKT 2010 07 30 12 19 55 31.3200 -97.3300 251.000 30.0 90.837 2.830 -999.990 -999.990 0.908 ..P WKT 2010 07 30 12 24 55 31.3200 -97.3300 251.000 122.0 85.430 2.280 -999.990 -999.990 0.854 ..P WKT 2010 07 30 12 29 55 31.3200 -97.3300 251.000 457.0 69.313 2.720 -999.990 -999.990 0.693 ..P WKT 2010 07 30 12 34 55 31.3200 -97.3300 251.000 30.0 93.540 2.700 -999.990 -999.990 0.935 ..P WKT 2010 07 30 12 39 55 31.3200 -97.3300 251.000 122.0 90.500 3.390 -999.990 -999.990 0.905 ..P WKT 2010 07 30 12 44 55 31.3200 -97.3300 251.000 457.0 81.897 3.020 -999.990 -999.990 0.819 ..P WKT 2010 07 30 12 54 55 31.3200 -97.3300 251.000 30.0 89.441 1.950 -999.990 -999.990 0.894 ..P WKT 2010 07 30 12 59 55 31.3200 -97.3300 251.000 122.0 91.262 2.970 -999.990 -999.990 0.913 ..P WKT 2010 07 30 13 04 55 31.3200 -97.3300 251.000 457.0 74.174 2.260 -999.990 -999.990 0.742 ..P WKT 2010 07 30 13 09 55 31.3200 -97.3300 251.000 30.0 87.814 2.180 -999.990 -999.990 0.878 ..P WKT 2010 07 30 13 14 55 31.3200 -97.3300 251.000 122.0 88.105 1.800 -999.990 -999.990 0.881 ..P WKT 2010 07 30 13 19 55 31.3200 -97.3300 251.000 457.0 70.883 1.430 -999.990 -999.990 0.709 ..P WKT 2010 07 30 13 29 55 31.3200 -97.3300 251.000 30.0 85.645 1.530 -999.990 -999.990 0.856 ..P WKT 2010 07 30 13 34 55 31.3200 -97.3300 251.000 122.0 90.662 1.880 -999.990 -999.990 0.907 ..P WKT 2010 07 30 13 39 55 31.3200 -97.3300 251.000 457.0 73.167 3.150 -999.990 -999.990 0.732 ..P WKT 2010 07 30 13 44 55 31.3200 -97.3300 251.000 30.0 94.301 1.710 -999.990 -999.990 0.943 ..P WKT 2010 07 30 13 49 55 31.3200 -97.3300 251.000 122.0 89.035 4.100 -999.990 -999.990 0.890 ..P WKT 2010 07 30 13 54 55 31.3200 -97.3300 251.000 457.0 74.046 3.220 -999.990 -999.990 0.740 ..P WKT 2010 07 30 14 04 55 31.3200 -97.3300 251.000 30.0 84.116 2.660 -999.990 -999.990 0.841 ..P WKT 2010 07 30 14 09 55 31.3200 -97.3300 251.000 122.0 89.725 4.080 -999.990 -999.990 0.897 ..P WKT 2010 07 30 14 14 55 31.3200 -97.3300 251.000 457.0 71.726 2.980 -999.990 -999.990 0.717 ..P WKT 2010 07 30 14 19 55 31.3200 -97.3300 251.000 30.0 88.998 2.920 -999.990 -999.990 0.890 ..P WKT 2010 07 30 14 24 55 31.3200 -97.3300 251.000 122.0 95.993 2.610 -999.990 -999.990 0.960 ..P WKT 2010 07 30 14 29 55 31.3200 -97.3300 251.000 457.0 75.223 2.920 -999.990 -999.990 0.752 ..P WKT 2010 07 30 14 39 55 31.3200 -97.3300 251.000 30.0 93.594 4.550 -999.990 -999.990 0.936 ..P WKT 2010 07 30 14 44 55 31.3200 -97.3300 251.000 122.0 99.694 2.960 -999.990 -999.990 0.997 ..P WKT 2010 07 30 14 49 55 31.3200 -97.3300 251.000 457.0 83.312 3.080 -999.990 -999.990 0.833 ..P WKT 2010 07 30 14 54 55 31.3200 -97.3300 251.000 30.0 90.244 2.470 -999.990 -999.990 0.902 ..P WKT 2010 07 30 14 59 55 31.3200 -97.3300 251.000 122.0 94.399 3.970 -999.990 -999.990 0.944 ..P WKT 2010 07 30 15 04 55 31.3200 -97.3300 251.000 457.0 83.295 2.000 -999.990 -999.990 0.833 ..P WKT 2010 07 30 15 14 55 31.3200 -97.3300 251.000 30.0 82.352 3.520 -999.990 -999.990 0.824 ..P WKT 2010 07 30 15 19 55 31.3200 -97.3300 251.000 122.0 90.014 3.600 -999.990 -999.990 0.900 ..P WKT 2010 07 30 15 24 55 31.3200 -97.3300 251.000 457.0 90.186 6.310 -999.990 -999.990 0.902 ..P WKT 2010 07 30 15 29 55 31.3200 -97.3300 251.000 30.0 83.286 3.360 -999.990 -999.990 0.833 ..P WKT 2010 07 30 15 34 55 31.3200 -97.3300 251.000 122.0 89.698 2.580 -999.990 -999.990 0.897 ..P WKT 2010 07 30 15 39 55 31.3200 -97.3300 251.000 457.0 83.908 3.370 -999.990 -999.990 0.839 ..P WKT 2010 07 30 15 49 55 31.3200 -97.3300 251.000 30.0 84.452 2.380 -999.990 -999.990 0.845 ..P WKT 2010 07 30 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 07 30 15 59 55 31.3200 -97.3300 251.000 457.0 85.054 3.250 -999.990 -999.990 0.851 ..P WKT 2010 07 30 16 04 55 31.3200 -97.3300 251.000 30.0 85.147 3.030 -999.990 -999.990 0.851 ..P WKT 2010 07 30 16 09 55 31.3200 -97.3300 251.000 122.0 97.849 2.990 -999.990 -999.990 0.978 ..P WKT 2010 07 30 16 14 55 31.3200 -97.3300 251.000 457.0 91.845 4.240 -999.990 -999.990 0.918 ..P WKT 2010 07 30 16 24 55 31.3200 -97.3300 251.000 30.0 91.021 3.240 -999.990 -999.990 0.910 ..P WKT 2010 07 30 16 29 55 31.3200 -97.3300 251.000 122.0 97.169 3.360 -999.990 -999.990 0.972 ..P WKT 2010 07 30 16 34 55 31.3200 -97.3300 251.000 457.0 92.097 3.820 -999.990 -999.990 0.921 ..P WKT 2010 07 30 16 39 55 31.3200 -97.3300 251.000 30.0 87.719 3.780 -999.990 -999.990 0.877 ..P WKT 2010 07 30 16 44 55 31.3200 -97.3300 251.000 122.0 103.558 3.080 -999.990 -999.990 1.036 ..P WKT 2010 07 30 16 49 55 31.3200 -97.3300 251.000 457.0 86.440 4.710 -999.990 -999.990 0.864 ..P WKT 2010 07 30 17 04 55 31.3200 -97.3300 251.000 30.0 90.180 2.760 -999.990 -999.990 0.902 ..P WKT 2010 07 30 17 09 55 31.3200 -97.3300 251.000 122.0 96.452 2.830 -999.990 -999.990 0.965 ..P WKT 2010 07 30 17 14 55 31.3200 -97.3300 251.000 457.0 83.623 2.830 -999.990 -999.990 0.836 ..P WKT 2010 07 30 17 19 55 31.3200 -97.3300 251.000 30.0 92.385 3.160 -999.990 -999.990 0.924 ..P WKT 2010 07 30 17 24 55 31.3200 -97.3300 251.000 122.0 96.442 3.530 -999.990 -999.990 0.964 ..P WKT 2010 07 30 17 29 55 31.3200 -97.3300 251.000 457.0 89.981 2.430 -999.990 -999.990 0.900 ..P WKT 2010 07 30 17 39 55 31.3200 -97.3300 251.000 30.0 87.568 4.920 -999.990 -999.990 0.876 ..P WKT 2010 07 30 17 44 55 31.3200 -97.3300 251.000 122.0 97.976 4.820 -999.990 -999.990 0.980 ..P WKT 2010 07 30 17 49 55 31.3200 -97.3300 251.000 457.0 92.891 4.220 -999.990 -999.990 0.929 ..P WKT 2010 07 30 17 54 55 31.3200 -97.3300 251.000 30.0 94.998 5.060 -999.990 -999.990 0.950 ..P WKT 2010 07 30 17 59 55 31.3200 -97.3300 251.000 122.0 100.148 4.860 -999.990 -999.990 1.001 ..P WKT 2010 07 30 18 04 55 31.3200 -97.3300 251.000 457.0 91.192 2.940 -999.990 -999.990 0.912 ..P WKT 2010 07 30 18 14 55 31.3200 -97.3300 251.000 30.0 91.615 2.980 -999.990 -999.990 0.916 ..P WKT 2010 07 30 18 19 55 31.3200 -97.3300 251.000 122.0 95.458 4.370 -999.990 -999.990 0.955 ..P WKT 2010 07 30 18 24 55 31.3200 -97.3300 251.000 457.0 90.733 5.720 -999.990 -999.990 0.907 ..P WKT 2010 07 30 18 29 55 31.3200 -97.3300 251.000 30.0 86.837 5.870 -999.990 -999.990 0.868 ..P WKT 2010 07 30 18 34 55 31.3200 -97.3300 251.000 122.0 97.038 5.140 -999.990 -999.990 0.970 ..P WKT 2010 07 30 18 39 55 31.3200 -97.3300 251.000 457.0 89.549 3.680 -999.990 -999.990 0.895 ..P WKT 2010 07 30 18 49 55 31.3200 -97.3300 251.000 30.0 88.728 3.790 -999.990 -999.990 0.887 ..P WKT 2010 07 30 18 54 55 31.3200 -97.3300 251.000 122.0 94.288 5.070 -999.990 -999.990 0.943 ..P WKT 2010 07 30 18 59 55 31.3200 -97.3300 251.000 457.0 91.144 6.450 -999.990 -999.990 0.911 ..P WKT 2010 07 30 19 04 55 31.3200 -97.3300 251.000 30.0 92.558 4.750 -999.990 -999.990 0.926 ..P WKT 2010 07 30 19 09 55 31.3200 -97.3300 251.000 122.0 103.916 4.040 -999.990 -999.990 1.039 ..P WKT 2010 07 30 19 14 55 31.3200 -97.3300 251.000 457.0 93.038 3.070 -999.990 -999.990 0.930 ..P WKT 2010 07 30 19 24 55 31.3200 -97.3300 251.000 30.0 94.485 3.240 -999.990 -999.990 0.945 ..P WKT 2010 07 30 19 29 55 31.3200 -97.3300 251.000 122.0 103.492 3.990 -999.990 -999.990 1.035 ..P WKT 2010 07 30 19 34 55 31.3200 -97.3300 251.000 457.0 92.618 4.880 -999.990 -999.990 0.926 ..P WKT 2010 07 30 19 39 55 31.3200 -97.3300 251.000 30.0 96.516 4.260 -999.990 -999.990 0.965 ..P WKT 2010 07 30 19 44 55 31.3200 -97.3300 251.000 122.0 102.207 4.090 -999.990 -999.990 1.022 ..P WKT 2010 07 30 19 49 55 31.3200 -97.3300 251.000 457.0 91.337 2.660 -999.990 -999.990 0.913 ..P WKT 2010 07 30 19 59 55 31.3200 -97.3300 251.000 30.0 92.725 2.790 -999.990 -999.990 0.927 ..P WKT 2010 07 30 20 04 55 31.3200 -97.3300 251.000 122.0 102.218 3.580 -999.990 -999.990 1.022 ..P WKT 2010 07 30 20 09 55 31.3200 -97.3300 251.000 457.0 95.708 4.960 -999.990 -999.990 0.957 ..P WKT 2010 07 30 20 14 55 31.3200 -97.3300 251.000 30.0 95.957 3.760 -999.990 -999.990 0.960 ..P WKT 2010 07 30 20 19 55 31.3200 -97.3300 251.000 122.0 129.170 3.690 -999.990 -999.990 1.292 ..P WKT 2010 07 30 20 24 55 31.3200 -97.3300 251.000 457.0 108.592 4.110 -999.990 -999.990 1.086 ..P WKT 2010 07 30 20 34 55 31.3200 -97.3300 251.000 30.0 98.964 3.240 -999.990 -999.990 0.990 ..P WKT 2010 07 30 20 39 55 31.3200 -97.3300 251.000 122.0 110.459 3.500 -999.990 -999.990 1.105 ..P WKT 2010 07 30 20 44 55 31.3200 -97.3300 251.000 457.0 99.206 3.800 -999.990 -999.990 0.992 ..P WKT 2010 07 30 20 49 55 31.3200 -97.3300 251.000 30.0 92.365 3.820 -999.990 -999.990 0.924 ..P WKT 2010 07 30 20 54 55 31.3200 -97.3300 251.000 122.0 109.372 3.400 -999.990 -999.990 1.094 ..P WKT 2010 07 30 20 59 55 31.3200 -97.3300 251.000 457.0 97.157 3.690 -999.990 -999.990 0.972 ..P WKT 2010 07 30 21 09 55 31.3200 -97.3300 251.000 30.0 103.541 3.360 -999.990 -999.990 1.035 ..P WKT 2010 07 30 21 14 55 31.3200 -97.3300 251.000 122.0 105.050 3.630 -999.990 -999.990 1.050 ..P WKT 2010 07 30 21 19 55 31.3200 -97.3300 251.000 457.0 94.984 3.900 -999.990 -999.990 0.950 ..P WKT 2010 07 30 21 24 55 31.3200 -97.3300 251.000 30.0 95.667 3.380 -999.990 -999.990 0.957 ..P WKT 2010 07 30 21 29 55 31.3200 -97.3300 251.000 122.0 110.399 3.380 -999.990 -999.990 1.104 ..P WKT 2010 07 30 21 34 55 31.3200 -97.3300 251.000 457.0 98.683 3.080 -999.990 -999.990 0.987 ..P WKT 2010 07 30 21 44 55 31.3200 -97.3300 251.000 30.0 99.732 3.690 -999.990 -999.990 0.997 ..P WKT 2010 07 30 21 49 55 31.3200 -97.3300 251.000 122.0 106.433 3.100 -999.990 -999.990 1.064 ..P WKT 2010 07 30 21 54 55 31.3200 -97.3300 251.000 457.0 98.538 3.640 -999.990 -999.990 0.985 ..P WKT 2010 07 30 21 59 55 31.3200 -97.3300 251.000 30.0 97.528 3.730 -999.990 -999.990 0.975 ..P WKT 2010 07 30 22 04 55 31.3200 -97.3300 251.000 122.0 106.981 3.410 -999.990 -999.990 1.070 ..P WKT 2010 07 30 22 09 55 31.3200 -97.3300 251.000 457.0 93.032 3.280 -999.990 -999.990 0.930 ..P WKT 2010 07 30 22 19 55 31.3200 -97.3300 251.000 30.0 95.339 2.950 -999.990 -999.990 0.953 ..P WKT 2010 07 30 22 24 55 31.3200 -97.3300 251.000 122.0 100.856 4.090 -999.990 -999.990 1.009 ..P WKT 2010 07 30 22 29 55 31.3200 -97.3300 251.000 457.0 90.962 3.710 -999.990 -999.990 0.910 ..P WKT 2010 07 30 22 34 55 31.3200 -97.3300 251.000 30.0 90.976 4.280 -999.990 -999.990 0.910 ..P WKT 2010 07 30 22 39 55 31.3200 -97.3300 251.000 122.0 105.572 4.450 -999.990 -999.990 1.056 ..P WKT 2010 07 30 22 44 55 31.3200 -97.3300 251.000 457.0 96.230 3.260 -999.990 -999.990 0.962 ..P WKT 2010 07 30 22 54 55 31.3200 -97.3300 251.000 30.0 87.356 3.840 -999.990 -999.990 0.874 ..P WKT 2010 07 30 22 59 55 31.3200 -97.3300 251.000 122.0 98.685 3.960 -999.990 -999.990 0.987 ..P WKT 2010 07 30 23 04 55 31.3200 -97.3300 251.000 457.0 96.125 4.530 -999.990 -999.990 0.961 ..P WKT 2010 07 30 23 09 55 31.3200 -97.3300 251.000 30.0 86.691 4.490 -999.990 -999.990 0.867 ..P WKT 2010 07 30 23 14 55 31.3200 -97.3300 251.000 122.0 104.615 4.680 -999.990 -999.990 1.046 ..P WKT 2010 07 30 23 19 55 31.3200 -97.3300 251.000 457.0 95.595 3.880 -999.990 -999.990 0.956 ..P WKT 2010 07 30 23 29 55 31.3200 -97.3300 251.000 30.0 101.840 4.120 -999.990 -999.990 1.018 ..P WKT 2010 07 30 23 34 55 31.3200 -97.3300 251.000 122.0 105.008 3.790 -999.990 -999.990 1.050 ..P WKT 2010 07 30 23 39 55 31.3200 -97.3300 251.000 457.0 94.297 5.000 -999.990 -999.990 0.943 ..P WKT 2010 07 30 23 44 55 31.3200 -97.3300 251.000 30.0 94.306 4.380 -999.990 -999.990 0.943 ..P WKT 2010 07 30 23 49 55 31.3200 -97.3300 251.000 122.0 96.238 4.460 -999.990 -999.990 0.962 ..P WKT 2010 07 31 00 09 55 31.3200 -97.3300 251.000 457.0 102.686 3.450 -999.990 -999.990 1.027 ..P WKT 2010 07 31 00 10 25 31.3200 -97.3300 251.000 457.0 100.108 3.870 -999.990 -999.990 1.001 ..P WKT 2010 07 31 00 10 55 31.3200 -97.3300 251.000 457.0 95.194 4.650 -999.990 -999.990 0.952 ..P WKT 2010 07 31 00 11 25 31.3200 -97.3300 251.000 457.0 91.104 3.660 -999.990 -999.990 0.911 ..P WKT 2010 07 31 00 11 55 31.3200 -97.3300 251.000 457.0 93.334 3.790 -999.990 -999.990 0.933 ..P WKT 2010 07 31 00 12 25 31.3200 -97.3300 251.000 457.0 96.113 3.580 -999.990 -999.990 0.961 ..P WKT 2010 07 31 00 12 55 31.3200 -97.3300 251.000 457.0 93.397 3.480 -999.990 -999.990 0.934 ..P WKT 2010 07 31 00 13 25 31.3200 -97.3300 251.000 457.0 92.879 3.440 -999.990 -999.990 0.929 ..P WKT 2010 07 31 00 13 55 31.3200 -97.3300 251.000 457.0 96.208 3.640 -999.990 -999.990 0.962 ..P WKT 2010 07 31 00 14 25 31.3200 -97.3300 251.000 457.0 97.751 3.630 -999.990 -999.990 0.978 ..P WKT 2010 07 31 00 14 55 31.3200 -97.3300 251.000 457.0 93.111 3.760 -999.990 -999.990 0.931 ..P WKT 2010 07 31 00 19 55 31.3200 -97.3300 251.000 30.0 96.589 3.800 -999.990 -999.990 0.966 ..P WKT 2010 07 31 00 24 55 31.3200 -97.3300 251.000 122.0 102.677 4.350 -999.990 -999.990 1.027 ..P WKT 2010 07 31 00 29 55 31.3200 -97.3300 251.000 457.0 95.161 4.540 -999.990 -999.990 0.952 ..P WKT 2010 07 31 00 34 55 31.3200 -97.3300 251.000 30.0 94.790 4.260 -999.990 -999.990 0.948 ..P WKT 2010 07 31 00 39 55 31.3200 -97.3300 251.000 122.0 100.056 3.810 -999.990 -999.990 1.001 ..P WKT 2010 07 31 00 44 55 31.3200 -97.3300 251.000 457.0 95.287 3.410 -999.990 -999.990 0.953 ..P WKT 2010 07 31 00 54 55 31.3200 -97.3300 251.000 30.0 95.243 3.960 -999.990 -999.990 0.952 ..P WKT 2010 07 31 00 59 55 31.3200 -97.3300 251.000 122.0 98.181 4.400 -999.990 -999.990 0.982 ..P WKT 2010 07 31 01 04 55 31.3200 -97.3300 251.000 457.0 93.144 4.670 -999.990 -999.990 0.931 ..P WKT 2010 07 31 01 09 55 31.3200 -97.3300 251.000 30.0 90.306 4.830 -999.990 -999.990 0.903 ..P WKT 2010 07 31 01 14 55 31.3200 -97.3300 251.000 122.0 94.345 4.100 -999.990 -999.990 0.943 ..P WKT 2010 07 31 01 19 55 31.3200 -97.3300 251.000 457.0 88.482 3.590 -999.990 -999.990 0.885 ..P WKT 2010 07 31 01 29 55 31.3200 -97.3300 251.000 30.0 98.232 4.360 -999.990 -999.990 0.982 ..P WKT 2010 07 31 01 34 55 31.3200 -97.3300 251.000 122.0 99.541 4.000 -999.990 -999.990 0.995 ..P WKT 2010 07 31 01 39 55 31.3200 -97.3300 251.000 457.0 90.117 4.240 -999.990 -999.990 0.901 ..P WKT 2010 07 31 01 44 55 31.3200 -97.3300 251.000 30.0 106.565 3.870 -999.990 -999.990 1.066 ..P WKT 2010 07 31 01 49 55 31.3200 -97.3300 251.000 122.0 115.857 5.100 -999.990 -999.990 1.159 ..P WKT 2010 07 31 01 54 55 31.3200 -97.3300 251.000 457.0 81.380 3.940 -999.990 -999.990 0.814 ..P WKT 2010 07 31 02 04 55 31.3200 -97.3300 251.000 30.0 110.312 5.010 -999.990 -999.990 1.103 ..P WKT 2010 07 31 02 09 55 31.3200 -97.3300 251.000 122.0 90.301 4.100 -999.990 -999.990 0.903 ..P WKT 2010 07 31 02 14 55 31.3200 -97.3300 251.000 457.0 87.362 5.660 -999.990 -999.990 0.874 ..P WKT 2010 07 31 02 19 55 31.3200 -97.3300 251.000 30.0 109.761 3.570 -999.990 -999.990 1.098 ..P WKT 2010 07 31 02 24 55 31.3200 -97.3300 251.000 122.0 98.284 3.760 -999.990 -999.990 0.983 ..P WKT 2010 07 31 02 29 55 31.3200 -97.3300 251.000 457.0 87.080 3.230 -999.990 -999.990 0.871 ..P WKT 2010 07 31 02 39 55 31.3200 -97.3300 251.000 30.0 98.870 4.060 -999.990 -999.990 0.989 ..P WKT 2010 07 31 02 44 55 31.3200 -97.3300 251.000 122.0 104.786 4.190 -999.990 -999.990 1.048 ..P WKT 2010 07 31 02 49 55 31.3200 -97.3300 251.000 457.0 93.342 3.240 -999.990 -999.990 0.933 ..P WKT 2010 07 31 02 54 55 31.3200 -97.3300 251.000 30.0 107.114 3.280 -999.990 -999.990 1.071 ..P WKT 2010 07 31 02 59 55 31.3200 -97.3300 251.000 122.0 100.630 5.440 -999.990 -999.990 1.006 ..P WKT 2010 07 31 03 04 55 31.3200 -97.3300 251.000 457.0 89.596 3.480 -999.990 -999.990 0.896 ..P WKT 2010 07 31 03 14 55 31.3200 -97.3300 251.000 30.0 99.268 3.770 -999.990 -999.990 0.993 ..P WKT 2010 07 31 03 19 55 31.3200 -97.3300 251.000 122.0 100.402 3.290 -999.990 -999.990 1.004 ..P WKT 2010 07 31 03 24 55 31.3200 -97.3300 251.000 457.0 92.299 3.300 -999.990 -999.990 0.923 ..P WKT 2010 07 31 03 29 55 31.3200 -97.3300 251.000 30.0 94.674 4.580 -999.990 -999.990 0.947 ..P WKT 2010 07 31 03 34 55 31.3200 -97.3300 251.000 122.0 95.671 3.540 -999.990 -999.990 0.957 ..P WKT 2010 07 31 03 39 55 31.3200 -97.3300 251.000 457.0 93.496 3.420 -999.990 -999.990 0.935 ..P WKT 2010 07 31 03 49 55 31.3200 -97.3300 251.000 30.0 97.952 3.440 -999.990 -999.990 0.980 ..P WKT 2010 07 31 03 54 55 31.3200 -97.3300 251.000 122.0 98.240 3.360 -999.990 -999.990 0.982 ..P WKT 2010 07 31 03 59 55 31.3200 -97.3300 251.000 457.0 85.558 3.470 -999.990 -999.990 0.856 ..P WKT 2010 07 31 04 04 55 31.3200 -97.3300 251.000 30.0 92.606 4.290 -999.990 -999.990 0.926 ..P WKT 2010 07 31 04 09 55 31.3200 -97.3300 251.000 122.0 93.308 3.400 -999.990 -999.990 0.933 ..P WKT 2010 07 31 04 14 55 31.3200 -97.3300 251.000 457.0 84.210 3.260 -999.990 -999.990 0.842 ..P WKT 2010 07 31 04 24 55 31.3200 -97.3300 251.000 30.0 96.082 4.010 -999.990 -999.990 0.961 ..P WKT 2010 07 31 04 29 55 31.3200 -97.3300 251.000 122.0 97.731 4.520 -999.990 -999.990 0.977 ..P WKT 2010 07 31 04 34 55 31.3200 -97.3300 251.000 457.0 87.782 3.430 -999.990 -999.990 0.878 ..P WKT 2010 07 31 04 39 55 31.3200 -97.3300 251.000 30.0 95.505 4.450 -999.990 -999.990 0.955 ..P WKT 2010 07 31 04 44 55 31.3200 -97.3300 251.000 122.0 93.840 3.460 -999.990 -999.990 0.938 ..P WKT 2010 07 31 04 49 55 31.3200 -97.3300 251.000 457.0 81.955 3.410 -999.990 -999.990 0.820 ..P WKT 2010 07 31 05 04 55 31.3200 -97.3300 251.000 30.0 84.176 3.250 -999.990 -999.990 0.842 ..P WKT 2010 07 31 05 09 55 31.3200 -97.3300 251.000 122.0 95.240 3.380 -999.990 -999.990 0.952 ..P WKT 2010 07 31 05 14 55 31.3200 -97.3300 251.000 457.0 80.882 3.460 -999.990 -999.990 0.809 ..P WKT 2010 07 31 05 19 55 31.3200 -97.3300 251.000 30.0 95.815 3.350 -999.990 -999.990 0.958 ..P WKT 2010 07 31 05 24 55 31.3200 -97.3300 251.000 122.0 98.038 3.280 -999.990 -999.990 0.980 ..P WKT 2010 07 31 05 29 55 31.3200 -97.3300 251.000 457.0 79.254 3.120 -999.990 -999.990 0.793 ..P WKT 2010 07 31 05 39 55 31.3200 -97.3300 251.000 30.0 94.125 3.730 -999.990 -999.990 0.941 ..P WKT 2010 07 31 05 44 55 31.3200 -97.3300 251.000 122.0 94.333 3.790 -999.990 -999.990 0.943 ..P WKT 2010 07 31 05 49 55 31.3200 -97.3300 251.000 457.0 76.292 3.220 -999.990 -999.990 0.763 ..P WKT 2010 07 31 05 54 55 31.3200 -97.3300 251.000 30.0 92.815 3.690 -999.990 -999.990 0.928 ..P WKT 2010 07 31 05 59 55 31.3200 -97.3300 251.000 122.0 99.386 3.320 -999.990 -999.990 0.994 ..P WKT 2010 07 31 06 04 55 31.3200 -97.3300 251.000 457.0 83.276 3.140 -999.990 -999.990 0.833 ..P WKT 2010 07 31 06 14 55 31.3200 -97.3300 251.000 30.0 94.047 3.030 -999.990 -999.990 0.940 ..P WKT 2010 07 31 06 19 55 31.3200 -97.3300 251.000 122.0 99.631 3.680 -999.990 -999.990 0.996 ..P WKT 2010 07 31 06 24 55 31.3200 -97.3300 251.000 457.0 85.017 3.690 -999.990 -999.990 0.850 ..P WKT 2010 07 31 06 29 55 31.3200 -97.3300 251.000 30.0 89.218 4.550 -999.990 -999.990 0.892 ..P WKT 2010 07 31 06 34 55 31.3200 -97.3300 251.000 122.0 93.420 4.560 -999.990 -999.990 0.934 ..P WKT 2010 07 31 06 39 55 31.3200 -97.3300 251.000 457.0 77.971 4.590 -999.990 -999.990 0.780 ..P WKT 2010 07 31 06 49 55 31.3200 -97.3300 251.000 30.0 93.276 4.740 -999.990 -999.990 0.933 ..P WKT 2010 07 31 06 54 55 31.3200 -97.3300 251.000 122.0 97.737 4.570 -999.990 -999.990 0.977 ..P WKT 2010 07 31 06 59 55 31.3200 -97.3300 251.000 457.0 80.602 4.400 -999.990 -999.990 0.806 ..P WKT 2010 07 31 07 04 55 31.3200 -97.3300 251.000 30.0 91.293 3.730 -999.990 -999.990 0.913 ..P WKT 2010 07 31 07 09 55 31.3200 -97.3300 251.000 122.0 109.187 3.420 -999.990 -999.990 1.092 ..P WKT 2010 07 31 07 14 55 31.3200 -97.3300 251.000 457.0 79.030 3.360 -999.990 -999.990 0.790 ..P WKT 2010 07 31 07 24 55 31.3200 -97.3300 251.000 30.0 100.143 3.300 -999.990 -999.990 1.001 ..P WKT 2010 07 31 07 29 55 31.3200 -97.3300 251.000 122.0 123.447 3.280 -999.990 -999.990 1.234 ..P WKT 2010 07 31 07 34 55 31.3200 -97.3300 251.000 457.0 88.847 3.590 -999.990 -999.990 0.888 ..P WKT 2010 07 31 07 39 55 31.3200 -97.3300 251.000 30.0 102.317 3.270 -999.990 -999.990 1.023 ..P WKT 2010 07 31 07 44 55 31.3200 -97.3300 251.000 122.0 121.748 4.600 -999.990 -999.990 1.217 ..P WKT 2010 07 31 07 49 55 31.3200 -97.3300 251.000 457.0 81.872 3.990 -999.990 -999.990 0.819 ..P WKT 2010 07 31 07 59 55 31.3200 -97.3300 251.000 30.0 99.119 3.670 -999.990 -999.990 0.991 ..P WKT 2010 07 31 08 04 55 31.3200 -97.3300 251.000 122.0 116.201 3.610 -999.990 -999.990 1.162 ..P WKT 2010 07 31 08 09 55 31.3200 -97.3300 251.000 457.0 79.359 3.050 -999.990 -999.990 0.794 ..P WKT 2010 07 31 08 14 55 31.3200 -97.3300 251.000 30.0 98.937 3.390 -999.990 -999.990 0.989 ..P WKT 2010 07 31 08 19 55 31.3200 -97.3300 251.000 122.0 107.982 3.870 -999.990 -999.990 1.080 ..P WKT 2010 07 31 08 24 55 31.3200 -97.3300 251.000 457.0 81.805 3.440 -999.990 -999.990 0.818 ..P WKT 2010 07 31 08 34 55 31.3200 -97.3300 251.000 30.0 104.631 4.640 -999.990 -999.990 1.046 ..P WKT 2010 07 31 08 39 55 31.3200 -97.3300 251.000 122.0 110.371 4.320 -999.990 -999.990 1.104 ..P WKT 2010 07 31 08 44 55 31.3200 -97.3300 251.000 457.0 87.257 3.870 -999.990 -999.990 0.873 ..P WKT 2010 07 31 08 49 55 31.3200 -97.3300 251.000 30.0 103.817 3.210 -999.990 -999.990 1.038 ..P WKT 2010 07 31 08 54 55 31.3200 -97.3300 251.000 122.0 105.672 3.240 -999.990 -999.990 1.057 ..P WKT 2010 07 31 08 59 55 31.3200 -97.3300 251.000 457.0 78.666 3.090 -999.990 -999.990 0.787 ..P WKT 2010 07 31 09 09 55 31.3200 -97.3300 251.000 30.0 102.419 3.240 -999.990 -999.990 1.024 ..P WKT 2010 07 31 09 14 55 31.3200 -97.3300 251.000 122.0 104.335 3.120 -999.990 -999.990 1.043 ..P WKT 2010 07 31 09 19 55 31.3200 -97.3300 251.000 457.0 77.100 3.520 -999.990 -999.990 0.771 ..P WKT 2010 07 31 09 24 55 31.3200 -97.3300 251.000 30.0 110.666 3.440 -999.990 -999.990 1.107 ..P WKT 2010 07 31 09 29 55 31.3200 -97.3300 251.000 122.0 98.144 4.040 -999.990 -999.990 0.981 ..P WKT 2010 07 31 09 34 55 31.3200 -97.3300 251.000 457.0 83.399 3.100 -999.990 -999.990 0.834 ..P WKT 2010 07 31 09 44 55 31.3200 -97.3300 251.000 30.0 110.163 3.690 -999.990 -999.990 1.102 ..P WKT 2010 07 31 09 49 55 31.3200 -97.3300 251.000 122.0 98.628 3.910 -999.990 -999.990 0.986 ..P WKT 2010 07 31 09 54 55 31.3200 -97.3300 251.000 457.0 84.313 3.860 -999.990 -999.990 0.843 ..P WKT 2010 07 31 09 59 55 31.3200 -97.3300 251.000 30.0 103.891 3.570 -999.990 -999.990 1.039 ..P WKT 2010 07 31 10 04 55 31.3200 -97.3300 251.000 122.0 92.352 4.630 -999.990 -999.990 0.924 ..P WKT 2010 07 31 10 09 55 31.3200 -97.3300 251.000 457.0 80.256 4.380 -999.990 -999.990 0.803 ..P WKT 2010 07 31 10 19 55 31.3200 -97.3300 251.000 30.0 99.713 3.890 -999.990 -999.990 0.997 ..P WKT 2010 07 31 10 24 55 31.3200 -97.3300 251.000 122.0 95.138 3.710 -999.990 -999.990 0.951 ..P WKT 2010 07 31 10 29 55 31.3200 -97.3300 251.000 457.0 80.555 3.400 -999.990 -999.990 0.806 ..P WKT 2010 07 31 10 34 55 31.3200 -97.3300 251.000 30.0 98.219 4.060 -999.990 -999.990 0.982 ..P WKT 2010 07 31 10 39 55 31.3200 -97.3300 251.000 122.0 91.976 3.770 -999.990 -999.990 0.920 ..P WKT 2010 07 31 10 44 55 31.3200 -97.3300 251.000 457.0 80.864 3.190 -999.990 -999.990 0.809 ..P WKT 2010 07 31 10 54 55 31.3200 -97.3300 251.000 30.0 92.744 3.810 -999.990 -999.990 0.927 ..P WKT 2010 07 31 10 59 55 31.3200 -97.3300 251.000 122.0 93.491 4.090 -999.990 -999.990 0.935 ..P WKT 2010 07 31 11 04 55 31.3200 -97.3300 251.000 457.0 77.964 4.010 -999.990 -999.990 0.780 ..P WKT 2010 07 31 11 09 55 31.3200 -97.3300 251.000 30.0 86.638 3.320 -999.990 -999.990 0.866 ..P WKT 2010 07 31 11 14 55 31.3200 -97.3300 251.000 122.0 95.036 3.340 -999.990 -999.990 0.950 ..P WKT 2010 07 31 11 19 55 31.3200 -97.3300 251.000 457.0 83.261 3.020 -999.990 -999.990 0.833 ..P WKT 2010 07 31 11 29 55 31.3200 -97.3300 251.000 30.0 94.802 3.140 -999.990 -999.990 0.948 ..P WKT 2010 07 31 11 34 55 31.3200 -97.3300 251.000 122.0 98.084 6.390 -999.990 -999.990 0.981 ..P WKT 2010 07 31 11 39 55 31.3200 -97.3300 251.000 457.0 86.196 3.920 -999.990 -999.990 0.862 ..P WKT 2010 07 31 11 44 55 31.3200 -97.3300 251.000 30.0 99.083 5.480 -999.990 -999.990 0.991 ..P WKT 2010 07 31 11 49 55 31.3200 -97.3300 251.000 122.0 99.164 4.910 -999.990 -999.990 0.992 ..P WKT 2010 07 31 12 09 55 31.3200 -97.3300 251.000 457.0 88.859 4.200 -999.990 -999.990 0.889 ..P WKT 2010 07 31 12 10 25 31.3200 -97.3300 251.000 457.0 89.322 4.270 -999.990 -999.990 0.893 ..P WKT 2010 07 31 12 10 55 31.3200 -97.3300 251.000 457.0 91.178 4.270 -999.990 -999.990 0.912 ..P WKT 2010 07 31 12 11 25 31.3200 -97.3300 251.000 457.0 90.944 4.540 -999.990 -999.990 0.909 ..P WKT 2010 07 31 12 11 55 31.3200 -97.3300 251.000 457.0 90.155 4.550 -999.990 -999.990 0.902 ..P WKT 2010 07 31 12 12 25 31.3200 -97.3300 251.000 457.0 88.668 4.060 -999.990 -999.990 0.887 ..P WKT 2010 07 31 12 12 55 31.3200 -97.3300 251.000 457.0 87.879 3.910 -999.990 -999.990 0.879 ..P WKT 2010 07 31 12 13 25 31.3200 -97.3300 251.000 457.0 88.203 3.920 -999.990 -999.990 0.882 ..P WKT 2010 07 31 12 13 55 31.3200 -97.3300 251.000 457.0 91.032 4.220 -999.990 -999.990 0.910 ..P WKT 2010 07 31 12 14 25 31.3200 -97.3300 251.000 457.0 87.180 4.690 -999.990 -999.990 0.872 ..P WKT 2010 07 31 12 14 55 31.3200 -97.3300 251.000 457.0 89.592 4.190 -999.990 -999.990 0.896 ..P WKT 2010 07 31 12 19 55 31.3200 -97.3300 251.000 30.0 98.119 4.520 -999.990 -999.990 0.981 ..P WKT 2010 07 31 12 24 55 31.3200 -97.3300 251.000 122.0 104.002 4.860 -999.990 -999.990 1.040 ..P WKT 2010 07 31 12 29 55 31.3200 -97.3300 251.000 457.0 84.968 4.360 -999.990 -999.990 0.850 ..P WKT 2010 07 31 12 34 55 31.3200 -97.3300 251.000 30.0 96.139 4.380 -999.990 -999.990 0.961 ..P WKT 2010 07 31 12 39 55 31.3200 -97.3300 251.000 122.0 100.351 4.560 -999.990 -999.990 1.004 ..P WKT 2010 07 31 12 44 55 31.3200 -97.3300 251.000 457.0 80.764 3.470 -999.990 -999.990 0.808 ..P WKT 2010 07 31 12 54 55 31.3200 -97.3300 251.000 30.0 99.830 3.480 -999.990 -999.990 0.998 ..P WKT 2010 07 31 12 59 55 31.3200 -97.3300 251.000 122.0 97.848 4.350 -999.990 -999.990 0.978 ..P WKT 2010 07 31 13 04 55 31.3200 -97.3300 251.000 457.0 80.840 4.710 -999.990 -999.990 0.808 ..P WKT 2010 07 31 13 09 55 31.3200 -97.3300 251.000 30.0 96.666 4.230 -999.990 -999.990 0.967 ..P WKT 2010 07 31 13 14 55 31.3200 -97.3300 251.000 122.0 96.909 4.290 -999.990 -999.990 0.969 ..P WKT 2010 07 31 13 19 55 31.3200 -97.3300 251.000 457.0 89.363 3.590 -999.990 -999.990 0.894 ..P WKT 2010 07 31 13 29 55 31.3200 -97.3300 251.000 30.0 100.859 7.370 -999.990 -999.990 1.009 ..P WKT 2010 07 31 13 34 55 31.3200 -97.3300 251.000 122.0 101.539 3.640 -999.990 -999.990 1.015 ..P WKT 2010 07 31 13 39 55 31.3200 -97.3300 251.000 457.0 93.875 3.980 -999.990 -999.990 0.939 ..P WKT 2010 07 31 13 44 55 31.3200 -97.3300 251.000 30.0 99.006 3.480 -999.990 -999.990 0.990 ..P WKT 2010 07 31 13 49 55 31.3200 -97.3300 251.000 122.0 104.414 4.610 -999.990 -999.990 1.044 ..P WKT 2010 07 31 13 54 55 31.3200 -97.3300 251.000 457.0 96.751 3.880 -999.990 -999.990 0.968 ..P WKT 2010 07 31 14 04 55 31.3200 -97.3300 251.000 30.0 97.079 3.270 -999.990 -999.990 0.971 ..P WKT 2010 07 31 14 09 55 31.3200 -97.3300 251.000 122.0 107.570 3.440 -999.990 -999.990 1.076 ..P WKT 2010 07 31 14 14 55 31.3200 -97.3300 251.000 457.0 82.751 3.300 -999.990 -999.990 0.828 ..P WKT 2010 07 31 14 19 55 31.3200 -97.3300 251.000 30.0 101.305 3.860 -999.990 -999.990 1.013 ..P WKT 2010 07 31 14 24 55 31.3200 -97.3300 251.000 122.0 107.902 2.890 -999.990 -999.990 1.079 ..P WKT 2010 07 31 14 29 55 31.3200 -97.3300 251.000 457.0 87.812 2.680 -999.990 -999.990 0.878 ..P WKT 2010 07 31 14 39 55 31.3200 -97.3300 251.000 30.0 103.607 3.190 -999.990 -999.990 1.036 ..P WKT 2010 07 31 14 44 55 31.3200 -97.3300 251.000 122.0 115.860 3.560 -999.990 -999.990 1.159 ..P WKT 2010 07 31 14 49 55 31.3200 -97.3300 251.000 457.0 84.064 3.420 -999.990 -999.990 0.841 ..P WKT 2010 07 31 14 54 55 31.3200 -97.3300 251.000 30.0 94.927 4.130 -999.990 -999.990 0.949 ..P WKT 2010 07 31 14 59 55 31.3200 -97.3300 251.000 122.0 103.010 3.170 -999.990 -999.990 1.030 ..P WKT 2010 07 31 15 04 55 31.3200 -97.3300 251.000 457.0 85.669 3.470 -999.990 -999.990 0.857 ..P WKT 2010 07 31 15 14 55 31.3200 -97.3300 251.000 30.0 97.488 3.260 -999.990 -999.990 0.975 ..P WKT 2010 07 31 15 19 55 31.3200 -97.3300 251.000 122.0 110.391 3.830 -999.990 -999.990 1.104 ..P WKT 2010 07 31 15 24 55 31.3200 -97.3300 251.000 457.0 90.375 3.190 -999.990 -999.990 0.904 ..P WKT 2010 07 31 15 29 55 31.3200 -97.3300 251.000 30.0 109.388 4.500 -999.990 -999.990 1.094 ..P WKT 2010 07 31 15 34 55 31.3200 -97.3300 251.000 122.0 113.539 3.570 -999.990 -999.990 1.135 ..P WKT 2010 07 31 15 39 55 31.3200 -97.3300 251.000 457.0 98.109 3.390 -999.990 -999.990 0.981 ..P WKT 2010 07 31 15 49 55 31.3200 -97.3300 251.000 30.0 100.202 2.990 -999.990 -999.990 1.002 ..P WKT 2010 07 31 15 54 55 31.3200 -97.3300 251.000 122.0 109.251 3.520 -999.990 -999.990 1.093 ..P WKT 2010 07 31 15 59 55 31.3200 -97.3300 251.000 457.0 91.920 3.480 -999.990 -999.990 0.919 ..P WKT 2010 07 31 16 04 55 31.3200 -97.3300 251.000 30.0 97.082 2.840 -999.990 -999.990 0.971 ..P WKT 2010 07 31 16 09 55 31.3200 -97.3300 251.000 122.0 110.435 3.950 -999.990 -999.990 1.104 ..P WKT 2010 07 31 16 14 55 31.3200 -97.3300 251.000 457.0 101.436 3.080 -999.990 -999.990 1.014 ..P WKT 2010 07 31 16 24 55 31.3200 -97.3300 251.000 30.0 101.386 3.520 -999.990 -999.990 1.014 ..P WKT 2010 07 31 16 29 55 31.3200 -97.3300 251.000 122.0 112.276 3.290 -999.990 -999.990 1.123 ..P WKT 2010 07 31 16 34 55 31.3200 -97.3300 251.000 457.0 106.233 3.690 -999.990 -999.990 1.062 ..P WKT 2010 07 31 16 39 55 31.3200 -97.3300 251.000 30.0 102.828 3.590 -999.990 -999.990 1.028 ..P WKT 2010 07 31 16 44 55 31.3200 -97.3300 251.000 122.0 110.246 3.100 -999.990 -999.990 1.102 ..P WKT 2010 07 31 16 49 55 31.3200 -97.3300 251.000 457.0 98.239 3.460 -999.990 -999.990 0.982 ..P WKT 2010 07 31 17 04 55 31.3200 -97.3300 251.000 30.0 100.464 4.670 -999.990 -999.990 1.005 ..P WKT 2010 07 31 17 09 55 31.3200 -97.3300 251.000 122.0 104.249 3.500 -999.990 -999.990 1.042 ..P WKT 2010 07 31 17 14 55 31.3200 -97.3300 251.000 457.0 86.949 4.290 -999.990 -999.990 0.869 ..P WKT 2010 07 31 17 19 55 31.3200 -97.3300 251.000 30.0 87.683 4.390 -999.990 -999.990 0.877 ..P WKT 2010 07 31 17 24 55 31.3200 -97.3300 251.000 122.0 100.067 4.310 -999.990 -999.990 1.001 ..P WKT 2010 07 31 17 29 55 31.3200 -97.3300 251.000 457.0 94.420 4.740 -999.990 -999.990 0.944 ..P WKT 2010 07 31 17 39 55 31.3200 -97.3300 251.000 30.0 92.227 4.200 -999.990 -999.990 0.922 ..P WKT 2010 07 31 17 44 55 31.3200 -97.3300 251.000 122.0 94.570 3.960 -999.990 -999.990 0.946 ..P WKT 2010 07 31 17 49 55 31.3200 -97.3300 251.000 457.0 91.089 4.160 -999.990 -999.990 0.911 ..P WKT 2010 07 31 17 54 55 31.3200 -97.3300 251.000 30.0 86.776 3.970 -999.990 -999.990 0.868 ..P WKT 2010 07 31 17 59 55 31.3200 -97.3300 251.000 122.0 98.824 3.470 -999.990 -999.990 0.988 ..P WKT 2010 07 31 18 04 55 31.3200 -97.3300 251.000 457.0 88.412 3.000 -999.990 -999.990 0.884 ..P WKT 2010 07 31 18 14 55 31.3200 -97.3300 251.000 30.0 88.661 3.320 -999.990 -999.990 0.887 ..P WKT 2010 07 31 18 19 55 31.3200 -97.3300 251.000 122.0 100.150 3.540 -999.990 -999.990 1.002 ..P WKT 2010 07 31 18 24 55 31.3200 -97.3300 251.000 457.0 85.306 3.900 -999.990 -999.990 0.853 ..P WKT 2010 07 31 18 29 55 31.3200 -97.3300 251.000 30.0 88.479 3.710 -999.990 -999.990 0.885 ..P WKT 2010 07 31 18 34 55 31.3200 -97.3300 251.000 122.0 99.690 3.870 -999.990 -999.990 0.997 ..P WKT 2010 07 31 18 39 55 31.3200 -97.3300 251.000 457.0 90.530 4.270 -999.990 -999.990 0.905 ..P WKT 2010 07 31 18 49 55 31.3200 -97.3300 251.000 30.0 84.800 4.240 -999.990 -999.990 0.848 ..P WKT 2010 07 31 18 54 55 31.3200 -97.3300 251.000 122.0 93.218 3.820 -999.990 -999.990 0.932 ..P WKT 2010 07 31 18 59 55 31.3200 -97.3300 251.000 457.0 89.443 3.370 -999.990 -999.990 0.894 ..P WKT 2010 07 31 19 04 55 31.3200 -97.3300 251.000 30.0 87.608 3.180 -999.990 -999.990 0.876 ..P WKT 2010 07 31 19 09 55 31.3200 -97.3300 251.000 122.0 90.067 3.240 -999.990 -999.990 0.901 ..P WKT 2010 07 31 19 14 55 31.3200 -97.3300 251.000 457.0 85.324 3.020 -999.990 -999.990 0.853 ..P WKT 2010 07 31 19 24 55 31.3200 -97.3300 251.000 30.0 86.760 3.240 -999.990 -999.990 0.868 ..P WKT 2010 07 31 19 29 55 31.3200 -97.3300 251.000 122.0 100.002 5.010 -999.990 -999.990 1.000 ..P WKT 2010 07 31 19 34 55 31.3200 -97.3300 251.000 457.0 92.192 3.920 -999.990 -999.990 0.922 ..P WKT 2010 07 31 19 39 55 31.3200 -97.3300 251.000 30.0 92.970 4.760 -999.990 -999.990 0.930 ..P WKT 2010 07 31 19 44 55 31.3200 -97.3300 251.000 122.0 109.531 4.530 -999.990 -999.990 1.095 ..P WKT 2010 07 31 19 49 55 31.3200 -97.3300 251.000 457.0 97.569 4.170 -999.990 -999.990 0.976 ..P WKT 2010 07 31 19 59 55 31.3200 -97.3300 251.000 30.0 97.441 4.030 -999.990 -999.990 0.974 ..P WKT 2010 07 31 20 04 55 31.3200 -97.3300 251.000 122.0 99.997 4.030 -999.990 -999.990 1.000 ..P WKT 2010 07 31 20 09 55 31.3200 -97.3300 251.000 457.0 95.909 4.250 -999.990 -999.990 0.959 ..P WKT 2010 07 31 20 14 55 31.3200 -97.3300 251.000 30.0 89.468 4.180 -999.990 -999.990 0.895 ..P WKT 2010 07 31 20 19 55 31.3200 -97.3300 251.000 122.0 106.003 3.650 -999.990 -999.990 1.060 ..P WKT 2010 07 31 20 24 55 31.3200 -97.3300 251.000 457.0 98.594 3.290 -999.990 -999.990 0.986 ..P WKT 2010 07 31 20 34 55 31.3200 -97.3300 251.000 30.0 98.485 3.150 -999.990 -999.990 0.985 ..P WKT 2010 07 31 20 39 55 31.3200 -97.3300 251.000 122.0 100.110 3.220 -999.990 -999.990 1.001 ..P WKT 2010 07 31 20 44 55 31.3200 -97.3300 251.000 457.0 90.806 3.520 -999.990 -999.990 0.908 ..P WKT 2010 07 31 20 49 55 31.3200 -97.3300 251.000 30.0 90.079 2.250 -999.990 -999.990 0.901 ..P WKT 2010 07 31 20 54 55 31.3200 -97.3300 251.000 122.0 106.786 4.150 -999.990 -999.990 1.068 ..P WKT 2010 07 31 20 59 55 31.3200 -97.3300 251.000 457.0 91.119 3.850 -999.990 -999.990 0.911 ..P WKT 2010 07 31 21 09 55 31.3200 -97.3300 251.000 30.0 98.460 3.630 -999.990 -999.990 0.985 ..P WKT 2010 07 31 21 14 55 31.3200 -97.3300 251.000 122.0 96.845 2.000 -999.990 -999.990 0.968 ..P WKT 2010 07 31 21 19 55 31.3200 -97.3300 251.000 457.0 90.805 2.710 -999.990 -999.990 0.908 ..P WKT 2010 07 31 21 24 55 31.3200 -97.3300 251.000 30.0 90.573 3.460 -999.990 -999.990 0.906 ..P WKT 2010 07 31 21 29 55 31.3200 -97.3300 251.000 122.0 100.852 2.730 -999.990 -999.990 1.009 ..P WKT 2010 07 31 21 34 55 31.3200 -97.3300 251.000 457.0 91.493 4.570 -999.990 -999.990 0.915 ..P WKT 2010 07 31 21 44 55 31.3200 -97.3300 251.000 30.0 99.681 2.850 -999.990 -999.990 0.997 ..P WKT 2010 07 31 21 49 55 31.3200 -97.3300 251.000 122.0 107.271 3.200 -999.990 -999.990 1.073 ..P WKT 2010 07 31 21 54 55 31.3200 -97.3300 251.000 457.0 100.204 4.050 -999.990 -999.990 1.002 ..P WKT 2010 07 31 21 59 55 31.3200 -97.3300 251.000 30.0 97.010 5.610 -999.990 -999.990 0.970 ..P WKT 2010 07 31 22 04 55 31.3200 -97.3300 251.000 122.0 110.404 4.480 -999.990 -999.990 1.104 ..P WKT 2010 07 31 22 09 55 31.3200 -97.3300 251.000 457.0 107.209 3.130 -999.990 -999.990 1.072 ..P WKT 2010 07 31 22 19 55 31.3200 -97.3300 251.000 30.0 102.973 3.440 -999.990 -999.990 1.030 ..P WKT 2010 07 31 22 24 55 31.3200 -97.3300 251.000 122.0 109.394 4.480 -999.990 -999.990 1.094 ..P WKT 2010 07 31 22 29 55 31.3200 -97.3300 251.000 457.0 100.338 5.730 -999.990 -999.990 1.003 ..P WKT 2010 07 31 22 34 55 31.3200 -97.3300 251.000 30.0 100.540 6.650 -999.990 -999.990 1.005 ..P WKT 2010 07 31 22 39 55 31.3200 -97.3300 251.000 122.0 105.302 4.090 -999.990 -999.990 1.053 ..P WKT 2010 07 31 22 44 55 31.3200 -97.3300 251.000 457.0 103.570 3.030 -999.990 -999.990 1.036 ..P WKT 2010 07 31 22 54 55 31.3200 -97.3300 251.000 30.0 100.441 3.460 -999.990 -999.990 1.004 ..P WKT 2010 07 31 22 59 55 31.3200 -97.3300 251.000 122.0 115.070 4.450 -999.990 -999.990 1.151 ..P WKT 2010 07 31 23 04 55 31.3200 -97.3300 251.000 457.0 103.588 4.700 -999.990 -999.990 1.036 ..P WKT 2010 07 31 23 09 55 31.3200 -97.3300 251.000 30.0 104.816 5.000 -999.990 -999.990 1.048 ..P WKT 2010 07 31 23 14 55 31.3200 -97.3300 251.000 122.0 116.541 4.050 -999.990 -999.990 1.165 ..P WKT 2010 07 31 23 19 55 31.3200 -97.3300 251.000 457.0 107.549 3.130 -999.990 -999.990 1.075 ..P WKT 2010 07 31 23 29 55 31.3200 -97.3300 251.000 30.0 105.294 3.530 -999.990 -999.990 1.053 ..P WKT 2010 07 31 23 34 55 31.3200 -97.3300 251.000 122.0 117.692 4.120 -999.990 -999.990 1.177 ..P WKT 2010 07 31 23 39 55 31.3200 -97.3300 251.000 457.0 106.063 4.490 -999.990 -999.990 1.061 ..P WKT 2010 07 31 23 44 55 31.3200 -97.3300 251.000 30.0 111.969 5.600 -999.990 -999.990 1.120 ..P WKT 2010 07 31 23 49 55 31.3200 -97.3300 251.000 122.0 117.186 6.690 -999.990 -999.990 1.172 ..P