# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Zeppelin Station/University of Stockholm # collaborator_name: Meteorological Institute [MISU] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: zep # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-08-31 16:48:29 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number ZEP 1994 02 11 14 30 00 315-91 P co CCGG 180.080 -999.990 ... R4 1994 03 23 15 28 00 78.9067 11.8883 479.00 474.00 5.00 166215 ZEP 1994 02 11 14 30 00 316-91 P co CCGG 182.290 -999.990 ... R4 1994 03 23 15 45 00 78.9067 11.8883 479.00 474.00 5.00 166216 ZEP 1994 02 14 14 30 00 179-91 P co CCGG 180.310 -999.990 ... R4 1994 03 23 08 38 00 78.9067 11.8883 479.00 474.00 5.00 166217 ZEP 1994 02 14 14 30 00 180-91 P co CCGG 178.240 -999.990 ... R4 1994 03 23 08 54 00 78.9067 11.8883 479.00 474.00 5.00 166218 ZEP 1994 02 17 09 45 00 503-91 P co CCGG 176.510 -999.990 ... R4 1994 03 23 13 13 00 78.9067 11.8883 479.00 474.00 5.00 166219 ZEP 1994 02 17 09 45 00 504-91 P co CCGG 176.050 -999.990 ... R4 1994 03 23 13 30 00 78.9067 11.8883 479.00 474.00 5.00 166220 ZEP 1994 02 19 14 00 00 501-91 P co CCGG 171.660 -999.990 ... R4 1994 03 23 12 41 00 78.9067 11.8883 479.00 474.00 5.00 166221 ZEP 1994 02 19 14 00 00 502-91 P co CCGG 173.310 -999.990 ... R4 1994 03 23 12 57 00 78.9067 11.8883 479.00 474.00 5.00 166222 ZEP 1994 02 21 14 00 00 245-91 P co CCGG 176.370 -999.990 ... R4 1994 03 23 13 46 00 78.9067 11.8883 479.00 474.00 5.00 166223 ZEP 1994 02 21 14 00 00 246-91 P co CCGG 176.100 -999.990 ... R4 1994 03 23 14 02 00 78.9067 11.8883 479.00 474.00 5.00 166224 ZEP 1994 02 22 15 00 00 333-91 P co CCGG 193.180 -999.990 ... R4 1994 03 23 14 18 00 78.9067 11.8883 479.00 474.00 5.00 166225 ZEP 1994 02 22 15 00 00 334-91 P co CCGG 191.400 -999.990 ... R4 1994 03 23 14 35 00 78.9067 11.8883 479.00 474.00 5.00 166226 ZEP 1994 02 23 08 00 00 441-91 P co CCGG 198.830 -999.990 ... R4 1994 03 24 09 10 00 78.9067 11.8883 479.00 474.00 5.00 166227 ZEP 1994 02 23 08 00 00 442-91 P co CCGG 198.770 -999.990 ... R4 1994 03 24 09 26 00 78.9067 11.8883 479.00 474.00 5.00 166228 ZEP 1994 02 23 17 15 00 203-91 P co CCGG 192.760 -999.990 ... R4 1994 03 24 12 32 00 78.9067 11.8883 479.00 474.00 5.00 166229 ZEP 1994 02 23 17 15 00 204-91 P co CCGG 193.310 -999.990 ... R4 1994 03 24 12 48 00 78.9067 11.8883 479.00 474.00 5.00 166230 ZEP 1994 04 22 08 55 00 82-91 P co CCGG 180.730 -999.990 ... R4 1994 06 16 11 07 00 78.9067 11.8883 479.00 474.00 5.00 166231 ZEP 1994 04 28 07 40 00 357-91 P co CCGG 183.320 -999.990 ... R4 1994 06 16 12 06 00 78.9067 11.8883 479.00 474.00 5.00 166232 ZEP 1994 04 28 07 40 00 358-91 P co CCGG 184.230 -999.990 ... R4 1994 06 16 12 22 00 78.9067 11.8883 479.00 474.00 5.00 166233 ZEP 1994 05 05 12 34 56 254-91 P co CCGG 172.170 -999.990 ... R4 1994 06 08 16 53 00 78.9067 11.8883 479.00 474.00 5.00 166234 ZEP 1994 05 12 12 34 56 57-91 P co CCGG 165.470 -999.990 ... R4 1994 06 08 14 33 00 78.9067 11.8883 479.00 474.00 5.00 166235 ZEP 1994 05 12 12 34 56 58-91 P co CCGG 165.050 -999.990 ... R4 1994 06 08 14 49 00 78.9067 11.8883 479.00 474.00 5.00 166236 ZEP 1994 05 16 12 45 00 537-91 P co CCGG 156.880 -999.990 ... R4 1994 06 08 11 08 00 78.9067 11.8883 479.00 474.00 5.00 166237 ZEP 1994 05 16 12 45 00 538-91 P co CCGG 155.810 -999.990 ... R4 1994 06 08 11 25 00 78.9067 11.8883 479.00 474.00 5.00 166238 ZEP 1994 05 18 07 30 00 243-91 P co CCGG 151.600 -999.990 ... R4 1994 06 08 08 52 00 78.9067 11.8883 479.00 474.00 5.00 166239 ZEP 1994 05 18 07 30 00 244-91 P co CCGG 150.230 -999.990 ... R4 1994 06 08 09 08 00 78.9067 11.8883 479.00 474.00 5.00 166240 ZEP 1994 05 21 07 45 00 151-91 P co CCGG 147.260 -999.990 ... R4 1994 06 08 09 25 00 78.9067 11.8883 479.00 474.00 5.00 166241 ZEP 1994 05 21 07 45 00 152-91 P co CCGG 148.330 -999.990 ... R4 1994 06 08 09 41 00 78.9067 11.8883 479.00 474.00 5.00 166242 ZEP 1994 05 23 07 30 00 27-91 P co CCGG 145.760 -999.990 ... R4 1994 06 08 11 41 00 78.9067 11.8883 479.00 474.00 5.00 166243 ZEP 1994 05 23 07 30 00 28-91 P co CCGG 147.240 -999.990 ... R4 1994 06 08 11 57 00 78.9067 11.8883 479.00 474.00 5.00 166244 ZEP 1994 05 26 16 15 00 747-91 P co CCGG 144.370 -999.990 ... R4 1994 06 16 09 08 00 78.9067 11.8883 479.00 474.00 5.00 166245 ZEP 1994 05 26 16 15 00 748-91 P co CCGG 145.660 -999.990 ... R4 1994 06 16 09 25 00 78.9067 11.8883 479.00 474.00 5.00 166246 ZEP 1994 05 28 07 25 00 745-91 P co CCGG 141.630 -999.990 ... R4 1994 06 16 10 51 00 78.9067 11.8883 479.00 474.00 5.00 166247 ZEP 1994 05 29 09 30 00 741-91 P co CCGG 140.320 -999.990 ... R4 1994 06 20 15 43 00 78.9067 11.8883 479.00 474.00 5.00 166248 ZEP 1994 05 29 09 30 00 742-91 P co CCGG 141.930 -999.990 ... R4 1994 06 20 15 59 00 78.9067 11.8883 479.00 474.00 5.00 166249 ZEP 1994 05 31 08 00 00 743-91 P co CCGG 135.060 -999.990 ... R4 1994 06 20 14 39 00 78.9067 11.8883 479.00 474.00 5.00 166250 ZEP 1994 05 31 08 00 00 744-91 P co CCGG 134.460 -999.990 ... R4 1994 06 20 14 55 00 78.9067 11.8883 479.00 474.00 5.00 166251 ZEP 1994 06 02 07 20 00 737-91 P co CCGG 138.290 -999.990 ... R4 1994 06 29 09 06 00 78.9067 11.8883 479.00 474.00 5.00 166252 ZEP 1994 06 02 07 20 00 738-91 P co CCGG 136.990 -999.990 ... R4 1994 06 29 09 22 00 78.9067 11.8883 479.00 474.00 5.00 166253 ZEP 1994 06 05 16 10 00 739-91 P co CCGG 129.060 -999.990 ... R4 1994 06 29 08 33 00 78.9067 11.8883 479.00 474.00 5.00 166254 ZEP 1994 06 05 16 10 00 740-91 P co CCGG 128.600 -999.990 ... R4 1994 06 29 08 50 00 78.9067 11.8883 479.00 474.00 5.00 166255 ZEP 1994 06 07 10 09 00 733-91 P co CCGG 123.930 -999.990 ... R4 1994 06 28 13 57 00 78.9067 11.8883 479.00 474.00 5.00 166256 ZEP 1994 06 07 10 09 00 734-91 P co CCGG 124.540 -999.990 ... R4 1994 06 28 14 14 00 78.9067 11.8883 479.00 474.00 5.00 166257 ZEP 1994 06 09 09 38 00 736-91 P co CCGG 126.240 -999.990 ... R4 1994 06 28 14 30 00 78.9067 11.8883 479.00 474.00 5.00 166259 ZEP 1994 06 13 08 40 00 800-91 P co CCGG 119.150 -999.990 ... R4 1994 07 01 09 05 00 78.9067 11.8883 479.00 474.00 5.00 166260 ZEP 1994 06 14 08 40 00 803-91 P co CCGG 119.900 -999.990 ... R4 1994 07 01 09 37 00 78.9067 11.8883 479.00 474.00 5.00 166261 ZEP 1994 06 14 08 40 00 804-91 P co CCGG 119.640 -999.990 ... R4 1994 07 01 09 54 00 78.9067 11.8883 479.00 474.00 5.00 166262 ZEP 1994 06 15 08 08 00 795-91 P co CCGG 119.260 -999.990 ... R4 1994 07 01 10 10 00 78.9067 11.8883 479.00 474.00 5.00 166263 ZEP 1994 06 15 08 08 00 796-91 P co CCGG 119.950 -999.990 ... R4 1994 07 01 10 26 00 78.9067 11.8883 479.00 474.00 5.00 166264 ZEP 1994 06 17 08 15 00 793-91 P co CCGG 117.560 -999.990 ... R4 1994 07 01 08 32 00 78.9067 11.8883 479.00 474.00 5.00 166265 ZEP 1994 06 17 08 15 00 794-91 P co CCGG 119.150 -999.990 ... R4 1994 07 01 08 48 00 78.9067 11.8883 479.00 474.00 5.00 166266 ZEP 1994 06 20 08 25 00 791-91 P co CCGG 114.820 -999.990 ... R4 1994 07 08 12 53 00 78.9067 11.8883 479.00 474.00 5.00 166267 ZEP 1994 06 20 08 25 00 792-91 P co CCGG 113.990 -999.990 ... R4 1994 07 08 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166268 ZEP 1994 06 23 07 25 00 197-91 P co CCGG 111.870 -999.990 ... R4 1994 07 08 11 47 00 78.9067 11.8883 479.00 474.00 5.00 166269 ZEP 1994 06 23 07 25 00 198-91 P co CCGG 111.220 -999.990 ... R4 1994 07 08 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166270 ZEP 1994 06 30 07 06 00 213-91 P co CCGG 112.220 -999.990 ... R4 1994 07 08 11 15 00 78.9067 11.8883 479.00 474.00 5.00 166271 ZEP 1994 06 30 07 06 00 214-91 P co CCGG 112.330 -999.990 ... R4 1994 07 08 11 31 00 78.9067 11.8883 479.00 474.00 5.00 166272 ZEP 1994 07 01 08 30 00 789-91 P co CCGG 109.320 -999.990 ... R4 1994 07 08 12 20 00 78.9067 11.8883 479.00 474.00 5.00 166273 ZEP 1994 07 01 08 30 00 790-91 P co CCGG 110.070 -999.990 ... R4 1994 07 08 12 36 00 78.9067 11.8883 479.00 474.00 5.00 166274 ZEP 1994 07 04 09 24 00 801-91 P co CCGG 105.210 -999.990 ... R4 1994 07 18 13 53 00 78.9067 11.8883 479.00 474.00 5.00 166275 ZEP 1994 07 04 09 24 00 802-91 P co CCGG 104.010 -999.990 ... R4 1994 07 18 14 10 00 78.9067 11.8883 479.00 474.00 5.00 166276 ZEP 1994 07 06 08 43 00 797-91 P co CCGG 96.100 -999.990 ... R4 1994 07 20 10 04 00 78.9067 11.8883 479.00 474.00 5.00 166277 ZEP 1994 07 06 08 43 00 798-91 P co CCGG 96.010 -999.990 ... R4 1994 07 20 10 20 00 78.9067 11.8883 479.00 474.00 5.00 166278 ZEP 1994 07 08 08 48 00 787-91 P co CCGG 97.970 -999.990 ... R4 1994 07 26 13 53 00 78.9067 11.8883 479.00 474.00 5.00 166279 ZEP 1994 07 08 08 48 00 788-91 P co CCGG 98.240 -999.990 ... R4 1994 07 26 14 09 00 78.9067 11.8883 479.00 474.00 5.00 166280 ZEP 1994 07 11 09 35 00 785-91 P co CCGG 93.940 -999.990 ... R4 1994 07 26 14 25 00 78.9067 11.8883 479.00 474.00 5.00 166281 ZEP 1994 07 11 09 35 00 786-91 P co CCGG 93.450 -999.990 ... R4 1994 07 26 14 41 00 78.9067 11.8883 479.00 474.00 5.00 166282 ZEP 1994 07 13 07 35 00 781-91 P co CCGG 98.740 -999.990 ... R4 1994 07 27 16 26 00 78.9067 11.8883 479.00 474.00 5.00 166283 ZEP 1994 07 13 07 35 00 782-91 P co CCGG 98.450 -999.990 ... R4 1994 07 27 16 43 00 78.9067 11.8883 479.00 474.00 5.00 166284 ZEP 1994 07 15 08 02 00 783-91 P co CCGG 102.260 -999.990 ... R4 1994 07 27 15 54 00 78.9067 11.8883 479.00 474.00 5.00 166285 ZEP 1994 07 15 08 02 00 784-91 P co CCGG 101.390 -999.990 ... R4 1994 07 27 16 10 00 78.9067 11.8883 479.00 474.00 5.00 166286 ZEP 1994 07 18 08 22 00 813-91 P co CCGG 97.630 -999.990 ... R4 1994 08 15 09 30 00 78.9067 11.8883 479.00 474.00 5.00 166287 ZEP 1994 07 18 08 22 00 814-91 P co CCGG 97.770 -999.990 ... R4 1994 08 15 09 46 00 78.9067 11.8883 479.00 474.00 5.00 166288 ZEP 1994 07 20 08 25 00 815-91 P co CCGG 94.190 -999.990 ... R4 1994 08 15 12 51 00 78.9067 11.8883 479.00 474.00 5.00 166289 ZEP 1994 07 20 08 25 00 816-91 P co CCGG 93.710 -999.990 ... R4 1994 08 15 13 07 00 78.9067 11.8883 479.00 474.00 5.00 166290 ZEP 1994 07 22 12 34 56 811-91 P co CCGG 103.460 -999.990 ... R4 1994 08 15 11 14 00 78.9067 11.8883 479.00 474.00 5.00 166291 ZEP 1994 07 27 08 48 00 807-91 P co CCGG 103.640 -999.990 ... R4 1994 08 15 10 03 00 78.9067 11.8883 479.00 474.00 5.00 166292 ZEP 1994 07 27 08 48 00 808-91 P co CCGG 103.370 -999.990 ... R4 1994 08 15 10 19 00 78.9067 11.8883 479.00 474.00 5.00 166293 ZEP 1994 07 29 08 50 00 810-91 P co CCGG 97.650 -999.990 ... R4 1994 08 16 16 25 00 78.9067 11.8883 479.00 474.00 5.00 166294 ZEP 1994 08 01 09 32 00 805-91 P co CCGG 107.040 -999.990 ... R4 1994 08 16 13 39 00 78.9067 11.8883 479.00 474.00 5.00 166295 ZEP 1994 08 01 09 32 00 806-91 P co CCGG 107.320 -999.990 ... R4 1994 08 16 13 55 00 78.9067 11.8883 479.00 474.00 5.00 166296 ZEP 1994 08 08 08 30 00 121-91 P co CCGG 93.940 -999.990 ... R4 1994 08 23 15 11 00 78.9067 11.8883 479.00 474.00 5.00 166297 ZEP 1994 08 08 08 30 00 122-91 P co CCGG 93.530 -999.990 ... R4 1994 08 23 15 27 00 78.9067 11.8883 479.00 474.00 5.00 166298 ZEP 1994 08 10 08 55 00 385-91 P co CCGG 94.330 -999.990 ... R4 1994 08 24 09 00 00 78.9067 11.8883 479.00 474.00 5.00 166299 ZEP 1994 08 10 08 55 00 386-91 P co CCGG 93.470 -999.990 ... R4 1994 08 24 09 16 00 78.9067 11.8883 479.00 474.00 5.00 166300 ZEP 1994 08 18 09 00 00 355-91 P co CCGG 110.030 -999.990 ... R4 1994 09 07 09 13 00 78.9067 11.8883 479.00 474.00 5.00 166301 ZEP 1994 08 18 09 00 00 356-91 P co CCGG 112.060 -999.990 ... R4 1994 09 07 09 30 00 78.9067 11.8883 479.00 474.00 5.00 166302 ZEP 1994 08 25 08 15 00 539-91 P co CCGG 115.290 -999.990 ... R4 1994 09 07 08 07 00 78.9067 11.8883 479.00 474.00 5.00 166303 ZEP 1994 08 25 08 15 00 540-91 P co CCGG 114.760 -999.990 ... R4 1994 09 07 08 23 00 78.9067 11.8883 479.00 474.00 5.00 166304 ZEP 1994 08 31 13 38 00 353-91 P co CCGG 105.380 -999.990 ... R4 1994 09 27 10 16 00 78.9067 11.8883 479.00 474.00 5.00 166305 ZEP 1994 08 31 13 38 00 354-91 P co CCGG 107.550 -999.990 ... R4 1994 09 27 10 32 00 78.9067 11.8883 479.00 474.00 5.00 166306 ZEP 1994 09 08 07 55 00 217-91 P co CCGG 118.900 -999.990 ... R4 1994 10 18 12 58 00 78.9067 11.8883 479.00 474.00 5.00 166307 ZEP 1994 09 15 08 30 00 199-91 P co CCGG 129.210 -999.990 ... R4 1994 10 18 14 03 00 78.9067 11.8883 479.00 474.00 5.00 166308 ZEP 1994 09 15 08 30 00 200-91 P co CCGG 128.820 -999.990 ... R4 1994 10 18 14 19 00 78.9067 11.8883 479.00 474.00 5.00 166309 ZEP 1994 09 22 08 00 00 717-91 P co CCGG 135.550 -999.990 ... R4 1994 10 25 17 56 00 78.9067 11.8883 479.00 474.00 5.00 166310 ZEP 1994 09 22 08 00 00 718-91 P co CCGG 134.340 -999.990 ... R4 1994 10 25 18 12 00 78.9067 11.8883 479.00 474.00 5.00 166311 ZEP 1994 09 29 08 20 00 715-91 P co CCGG 135.500 -999.990 ... R4 1994 10 25 17 24 00 78.9067 11.8883 479.00 474.00 5.00 166312 ZEP 1994 09 29 08 20 00 716-91 P co CCGG 136.350 -999.990 ... R4 1994 10 25 17 40 00 78.9067 11.8883 479.00 474.00 5.00 166313 ZEP 1994 10 06 08 14 00 273-91 P co CCGG 131.750 -999.990 ... R4 1994 11 04 13 54 00 78.9067 11.8883 479.00 474.00 5.00 166314 ZEP 1994 10 06 08 14 00 274-91 P co CCGG 132.340 -999.990 ... R4 1994 11 04 14 11 00 78.9067 11.8883 479.00 474.00 5.00 166315 ZEP 1994 10 13 08 42 00 323-91 P co CCGG 132.950 -999.990 ... R4 1994 11 04 13 22 00 78.9067 11.8883 479.00 474.00 5.00 166316 ZEP 1994 10 13 08 42 00 324-91 P co CCGG 133.010 -999.990 ... R4 1994 11 04 13 38 00 78.9067 11.8883 479.00 474.00 5.00 166317 ZEP 1994 10 20 08 20 00 669-91 P co CCGG 129.620 -999.990 ... R4 1995 01 05 15 51 00 78.9067 11.8883 479.00 474.00 5.00 166318 ZEP 1994 10 20 08 20 00 670-91 P co CCGG 128.490 -999.990 ... R4 1995 01 05 16 08 00 78.9067 11.8883 479.00 474.00 5.00 166319 ZEP 1994 10 27 10 10 00 305-91 P co CCGG 133.560 -999.990 ... R4 1995 01 05 14 13 00 78.9067 11.8883 479.00 474.00 5.00 166320 ZEP 1994 10 27 10 10 00 306-91 P co CCGG 134.810 -999.990 ... R4 1995 01 05 14 29 00 78.9067 11.8883 479.00 474.00 5.00 166321 ZEP 1994 11 03 10 25 00 83-91 P co CCGG 132.290 -999.990 ... R4 1995 01 05 13 33 00 78.9067 11.8883 479.00 474.00 5.00 166322 ZEP 1994 11 03 10 25 00 84-91 P co CCGG 132.710 -999.990 ... R4 1995 01 05 13 49 00 78.9067 11.8883 479.00 474.00 5.00 166323 ZEP 1994 11 10 08 20 00 69-91 P co CCGG 133.380 -999.990 ... R4 1995 01 05 12 28 00 78.9067 11.8883 479.00 474.00 5.00 166324 ZEP 1994 11 10 08 20 00 70-91 P co CCGG 133.530 -999.990 ... R4 1995 01 05 12 44 00 78.9067 11.8883 479.00 474.00 5.00 166325 ZEP 1994 11 17 08 58 00 109-91 P co CCGG 136.630 -999.990 ..> R4 1995 02 07 10 48 00 78.9067 11.8883 479.00 474.00 5.00 166326 ZEP 1994 11 17 08 58 00 110-91 P co CCGG 135.490 -999.990 ... R4 1995 02 07 11 04 00 78.9067 11.8883 479.00 474.00 5.00 166327 ZEP 1994 11 24 08 40 00 119-91 P co CCGG 249.980 -999.990 .XC R4 1995 02 07 09 44 00 78.9067 11.8883 479.00 474.00 5.00 166328 ZEP 1994 11 24 08 40 00 120-91 P co CCGG -999.990 -999.990 *.. R4 1995 02 07 10 00 00 78.9067 11.8883 479.00 474.00 5.00 166329 ZEP 1994 12 01 23 05 00 27-91 P co CCGG 148.660 -999.990 ... R4 1995 02 13 12 26 00 78.9067 11.8883 479.00 474.00 5.00 166331 ZEP 1994 12 01 23 05 00 28-91 P co CCGG 148.320 -999.990 ... R4 1995 02 13 12 43 00 78.9067 11.8883 479.00 474.00 5.00 166332 ZEP 1994 12 10 10 13 00 229-91 P co CCGG 181.850 -999.990 .X. R4 1995 02 07 11 21 00 78.9067 11.8883 479.00 474.00 5.00 166333 ZEP 1994 12 10 10 13 00 230-91 P co CCGG 180.200 -999.990 .X. R4 1995 02 07 11 37 00 78.9067 11.8883 479.00 474.00 5.00 166334 ZEP 1994 12 15 08 37 00 441-91 P co CCGG 152.070 -999.990 ... R4 1995 02 07 14 51 00 78.9067 11.8883 479.00 474.00 5.00 166335 ZEP 1994 12 15 08 37 00 442-91 P co CCGG 152.710 -999.990 ... R4 1995 02 07 15 07 00 78.9067 11.8883 479.00 474.00 5.00 166336 ZEP 1994 12 22 14 43 00 145-91 P co CCGG 167.890 -999.990 P.. R4 1995 03 16 07 31 00 78.9067 11.8883 479.00 474.00 5.00 166337 ZEP 1994 12 22 14 43 00 146-91 P co CCGG 164.440 -999.990 P.. R4 1995 03 16 07 47 00 78.9067 11.8883 479.00 474.00 5.00 166338 ZEP 1994 12 29 10 05 00 295-91 P co CCGG 165.670 -999.990 ... R4 1995 03 15 12 47 00 78.9067 11.8883 479.00 474.00 5.00 166339 ZEP 1994 12 29 10 05 00 296-91 P co CCGG 166.610 -999.990 ... R4 1995 03 15 13 03 00 78.9067 11.8883 479.00 474.00 5.00 166340 ZEP 1995 01 05 08 45 00 1-91 P co CCGG 161.750 -999.990 ... R4 1995 03 20 10 12 00 78.9067 11.8883 479.00 474.00 5.00 166341 ZEP 1995 01 05 08 45 00 2-91 P co CCGG 162.780 -999.990 ... R4 1995 03 20 10 28 00 78.9067 11.8883 479.00 474.00 5.00 166342 ZEP 1995 01 12 09 20 00 549-91 P co CCGG 155.120 -999.990 ... R4 1995 03 20 08 40 00 78.9067 11.8883 479.00 474.00 5.00 166343 ZEP 1995 01 12 09 20 00 550-91 P co CCGG 153.870 -999.990 ... R4 1995 03 20 08 56 00 78.9067 11.8883 479.00 474.00 5.00 166344 ZEP 1995 01 20 09 04 00 139-91 P co CCGG 162.910 -999.990 ... R4 1995 03 17 12 55 00 78.9067 11.8883 479.00 474.00 5.00 166345 ZEP 1995 01 26 08 53 00 717-91 P co CCGG 171.170 -999.990 ... R4 1995 03 20 08 07 00 78.9067 11.8883 479.00 474.00 5.00 166346 ZEP 1995 01 26 08 53 00 718-91 P co CCGG 170.980 -999.990 ... R4 1995 03 20 08 24 00 78.9067 11.8883 479.00 474.00 5.00 166347 ZEP 1995 02 02 09 30 00 739-91 P co CCGG 178.160 -999.990 ... R4 1995 03 16 09 09 00 78.9067 11.8883 479.00 474.00 5.00 166348 ZEP 1995 02 02 09 30 00 740-91 P co CCGG 179.240 -999.990 ... R4 1995 03 16 09 25 00 78.9067 11.8883 479.00 474.00 5.00 166349 ZEP 1995 02 09 09 18 00 733-91 P co CCGG 179.290 -999.990 ... R4 1995 03 16 08 36 00 78.9067 11.8883 479.00 474.00 5.00 166350 ZEP 1995 02 09 09 18 00 734-91 P co CCGG 178.440 -999.990 ... R4 1995 03 16 08 52 00 78.9067 11.8883 479.00 474.00 5.00 166351 ZEP 1995 02 16 08 50 00 747-91 P co CCGG 179.440 -999.990 ... R4 1995 05 02 15 48 00 78.9067 11.8883 479.00 474.00 5.00 166352 ZEP 1995 02 16 08 50 00 748-91 P co CCGG 177.940 -999.990 ... R4 1995 05 02 16 04 00 78.9067 11.8883 479.00 474.00 5.00 166353 ZEP 1995 02 23 09 05 00 809-91 P co CCGG 212.640 -999.990 .X. R4 1995 05 02 13 15 00 78.9067 11.8883 479.00 474.00 5.00 166354 ZEP 1995 02 23 09 05 00 810-91 P co CCGG 212.950 -999.990 .X. R4 1995 05 02 13 31 00 78.9067 11.8883 479.00 474.00 5.00 166355 ZEP 1995 03 02 09 25 00 815-91 P co CCGG 198.980 -999.990 ... R4 1995 05 02 12 42 00 78.9067 11.8883 479.00 474.00 5.00 166356 ZEP 1995 03 02 09 25 00 816-91 P co CCGG 200.560 -999.990 ... R4 1995 05 02 12 59 00 78.9067 11.8883 479.00 474.00 5.00 166357 ZEP 1995 03 09 09 21 00 787-91 P co CCGG 173.910 -999.990 ... R4 1995 05 02 13 47 00 78.9067 11.8883 479.00 474.00 5.00 166358 ZEP 1995 03 16 09 55 00 177-91 P co CCGG 189.470 -999.990 ... R4 1995 06 01 10 14 00 78.9067 11.8883 479.00 474.00 5.00 166359 ZEP 1995 03 16 09 55 00 178-91 P co CCGG 187.560 -999.990 ... R4 1995 06 01 10 31 00 78.9067 11.8883 479.00 474.00 5.00 166360 ZEP 1995 03 23 10 30 00 593-91 P co CCGG 185.530 -999.990 ... R4 1995 06 01 08 33 00 78.9067 11.8883 479.00 474.00 5.00 166361 ZEP 1995 03 23 10 30 00 594-91 P co CCGG 185.510 -999.990 ... R4 1995 06 01 08 49 00 78.9067 11.8883 479.00 474.00 5.00 166362 ZEP 1995 03 31 08 25 00 345-91 P co CCGG 198.240 -999.990 P.. R4 1995 05 31 15 14 00 78.9067 11.8883 479.00 474.00 5.00 166363 ZEP 1995 03 31 08 25 00 346-91 P co CCGG 195.340 -999.990 P.. R4 1995 05 31 15 30 00 78.9067 11.8883 479.00 474.00 5.00 166364 ZEP 1995 04 06 07 56 00 511-91 P co CCGG 181.210 -999.990 ... R4 1995 05 31 14 42 00 78.9067 11.8883 479.00 474.00 5.00 166365 ZEP 1995 04 06 07 56 00 512-91 P co CCGG 183.070 -999.990 ... R4 1995 05 31 14 58 00 78.9067 11.8883 479.00 474.00 5.00 166366 ZEP 1995 04 13 08 35 00 59-91 P co CCGG 182.900 -999.990 ... R4 1995 07 12 12 24 00 78.9067 11.8883 479.00 474.00 5.00 166367 ZEP 1995 04 13 08 35 00 60-91 P co CCGG 183.250 -999.990 ... R4 1995 07 12 12 41 00 78.9067 11.8883 479.00 474.00 5.00 166368 ZEP 1995 04 20 08 06 00 643-91 P co CCGG 173.480 -999.990 ..< R4 1995 07 12 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166369 ZEP 1995 04 20 08 06 00 644-91 P co CCGG 172.890 -999.990 ... R4 1995 07 12 12 08 00 78.9067 11.8883 479.00 474.00 5.00 166370 ZEP 1995 04 27 08 30 00 537-91 P co CCGG 164.810 -999.990 ... R4 1995 07 13 11 10 00 78.9067 11.8883 479.00 474.00 5.00 166371 ZEP 1995 04 27 08 30 00 538-91 P co CCGG 165.030 -999.990 ... R4 1995 07 13 11 27 00 78.9067 11.8883 479.00 474.00 5.00 166372 ZEP 1995 05 04 08 17 00 1173-91 P co CCGG 153.330 -999.990 ... R4 1995 07 12 16 23 00 78.9067 11.8883 479.00 474.00 5.00 166373 ZEP 1995 05 04 08 17 00 1174-91 P co CCGG 154.380 -999.990 ... R4 1995 07 12 16 40 00 78.9067 11.8883 479.00 474.00 5.00 166374 ZEP 1995 05 11 08 10 00 157-91 P co CCGG 150.860 -999.990 ... R7 1995 08 21 17 32 00 78.9067 11.8883 479.00 474.00 5.00 166375 ZEP 1995 05 11 08 10 00 158-91 P co CCGG 149.160 -999.990 ... R7 1995 08 21 17 49 00 78.9067 11.8883 479.00 474.00 5.00 166376 ZEP 1995 05 18 07 35 00 859-91 P co CCGG 154.450 -999.990 P.. R7 1995 08 21 18 05 00 78.9067 11.8883 479.00 474.00 5.00 166377 ZEP 1995 05 18 07 35 00 860-91 P co CCGG 151.080 -999.990 P.. R7 1995 08 21 18 21 00 78.9067 11.8883 479.00 474.00 5.00 166378 ZEP 1995 05 25 07 50 00 661-91 P co CCGG 139.260 -999.990 ... R7 1995 08 18 14 56 00 78.9067 11.8883 479.00 474.00 5.00 166379 ZEP 1995 05 25 07 50 00 662-91 P co CCGG 141.690 -999.990 ... R7 1995 08 18 15 12 00 78.9067 11.8883 479.00 474.00 5.00 166380 ZEP 1995 06 02 14 10 00 669-91 P co CCGG 126.350 -999.990 P.. R7 1995 08 21 10 32 00 78.9067 11.8883 479.00 474.00 5.00 166381 ZEP 1995 06 02 14 10 00 670-91 P co CCGG 121.140 -999.990 P.. R7 1995 08 21 10 48 00 78.9067 11.8883 479.00 474.00 5.00 166382 ZEP 1995 06 09 08 20 00 167-91 P co CCGG 118.740 -999.990 ... R4 1995 07 17 12 52 00 78.9067 11.8883 479.00 474.00 5.00 166383 ZEP 1995 06 09 08 20 00 168-91 P co CCGG 116.480 -999.990 ... R4 1995 07 17 13 08 00 78.9067 11.8883 479.00 474.00 5.00 166384 ZEP 1995 06 09 08 30 00 801-91 P co CCGG 115.110 -999.990 ... R7 1995 08 21 09 59 00 78.9067 11.8883 479.00 474.00 5.00 166385 ZEP 1995 06 09 08 30 00 802-91 P co CCGG 115.750 -999.990 ... R7 1995 08 21 10 15 00 78.9067 11.8883 479.00 474.00 5.00 166386 ZEP 1995 06 11 08 00 00 100-91 P co CCGG 111.910 -999.990 ... R4 1995 07 14 15 08 00 78.9067 11.8883 479.00 474.00 5.00 166388 ZEP 1995 06 11 08 00 00 99-91 P co CCGG 112.140 -999.990 ... R4 1995 07 14 14 51 00 78.9067 11.8883 479.00 474.00 5.00 166387 ZEP 1995 06 13 07 33 00 793-91 P co CCGG 106.920 -999.990 ... R7 1995 08 21 08 54 00 78.9067 11.8883 479.00 474.00 5.00 166389 ZEP 1995 06 13 07 33 00 794-91 P co CCGG 107.880 -999.990 ... R7 1995 08 21 09 10 00 78.9067 11.8883 479.00 474.00 5.00 166390 ZEP 1995 06 14 17 58 00 813-91 P co CCGG 108.740 -999.990 ... R4 1995 07 14 12 53 00 78.9067 11.8883 479.00 474.00 5.00 166391 ZEP 1995 06 14 17 58 00 814-91 P co CCGG 107.180 -999.990 ... R4 1995 07 14 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166392 ZEP 1995 06 15 12 57 00 25-91 P co CCGG 106.400 -999.990 ... R7 1995 08 21 12 21 00 78.9067 11.8883 479.00 474.00 5.00 166393 ZEP 1995 06 15 12 57 00 26-91 P co CCGG 106.390 -999.990 ... R7 1995 08 21 12 37 00 78.9067 11.8883 479.00 474.00 5.00 166394 ZEP 1995 06 16 18 12 00 811-91 P co CCGG 106.310 -999.990 ... R4 1995 07 14 14 15 00 78.9067 11.8883 479.00 474.00 5.00 166395 ZEP 1995 06 16 18 12 00 812-91 P co CCGG 105.380 -999.990 ... R4 1995 07 14 14 31 00 78.9067 11.8883 479.00 474.00 5.00 166396 ZEP 1995 06 17 14 05 00 741-91 P co CCGG 108.330 -999.990 P.. R7 1995 08 22 09 39 00 78.9067 11.8883 479.00 474.00 5.00 166397 ZEP 1995 06 17 14 05 00 742-91 P co CCGG 104.710 -999.990 P.. R7 1995 08 22 09 55 00 78.9067 11.8883 479.00 474.00 5.00 166398 ZEP 1995 06 18 13 10 00 791-91 P co CCGG 105.380 -999.990 ... R7 1995 08 22 10 48 00 78.9067 11.8883 479.00 474.00 5.00 166399 ZEP 1995 06 18 13 10 00 792-91 P co CCGG 104.470 -999.990 ... R7 1995 08 22 11 05 00 78.9067 11.8883 479.00 474.00 5.00 166400 ZEP 1995 06 19 13 50 00 735-91 P co CCGG 103.300 -999.990 ... R4 1995 07 14 13 42 00 78.9067 11.8883 479.00 474.00 5.00 166401 ZEP 1995 06 19 13 50 00 736-91 P co CCGG 104.070 -999.990 ... R4 1995 07 14 13 58 00 78.9067 11.8883 479.00 474.00 5.00 166402 ZEP 1995 06 20 13 50 00 797-91 P co CCGG 101.040 -999.990 ... R4 1995 07 14 13 25 00 78.9067 11.8883 479.00 474.00 5.00 166403 ZEP 1995 06 22 07 25 00 1175-91 P co CCGG 104.310 -999.990 ... R7 1995 08 21 11 15 00 78.9067 11.8883 479.00 474.00 5.00 166405 ZEP 1995 06 22 07 25 00 1176-91 P co CCGG 104.400 -999.990 ... R7 1995 08 21 11 31 00 78.9067 11.8883 479.00 474.00 5.00 166406 ZEP 1995 06 22 17 10 00 33-91 P co CCGG 103.070 -999.990 ... R4 1995 07 17 13 57 00 78.9067 11.8883 479.00 474.00 5.00 166407 ZEP 1995 06 22 17 10 00 34-91 P co CCGG 104.600 -999.990 ... R4 1995 07 17 14 13 00 78.9067 11.8883 479.00 474.00 5.00 166408 ZEP 1995 06 23 07 50 00 87-91 P co CCGG 105.700 -999.990 ... R4 1995 07 17 13 24 00 78.9067 11.8883 479.00 474.00 5.00 166409 ZEP 1995 06 23 07 50 00 88-91 P co CCGG 103.110 -999.990 ... R4 1995 07 17 13 41 00 78.9067 11.8883 479.00 474.00 5.00 166410 ZEP 1995 06 23 12 50 00 733-91 P co CCGG 111.310 -999.990 P.. R7 1995 08 21 12 53 00 78.9067 11.8883 479.00 474.00 5.00 166411 ZEP 1995 06 23 12 50 00 734-91 P co CCGG 108.320 -999.990 P.. R7 1995 08 21 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166412 ZEP 1995 06 23 14 35 00 739-91 P co CCGG 110.330 -999.990 P.. R7 1995 08 21 09 26 00 78.9067 11.8883 479.00 474.00 5.00 166413 ZEP 1995 06 23 14 35 00 740-91 P co CCGG 124.890 -999.990 P.. R7 1995 08 21 09 43 00 78.9067 11.8883 479.00 474.00 5.00 166414 ZEP 1995 06 23 17 10 00 799-91 P co CCGG 110.650 -999.990 ... R7 1995 08 21 14 07 00 78.9067 11.8883 479.00 474.00 5.00 166415 ZEP 1995 06 24 07 30 00 745-91 P co CCGG 106.410 -999.990 ... R7 1995 08 21 13 35 00 78.9067 11.8883 479.00 474.00 5.00 166416 ZEP 1995 06 24 07 30 00 746-91 P co CCGG 105.660 -999.990 ... R7 1995 08 21 13 51 00 78.9067 11.8883 479.00 474.00 5.00 166417 ZEP 1995 06 24 16 55 00 815-91 P co CCGG 99.760 -999.990 ... R7 1995 08 22 11 21 00 78.9067 11.8883 479.00 474.00 5.00 166418 ZEP 1995 06 24 16 55 00 816-91 P co CCGG 98.500 -999.990 ... R7 1995 08 22 11 37 00 78.9067 11.8883 479.00 474.00 5.00 166419 ZEP 1995 06 25 12 00 00 747-91 P co CCGG 96.590 -999.990 ... R7 1995 08 22 12 00 00 78.9067 11.8883 479.00 474.00 5.00 166420 ZEP 1995 06 25 12 00 00 748-91 P co CCGG 97.990 -999.990 ... R7 1995 08 22 12 16 00 78.9067 11.8883 479.00 474.00 5.00 166421 ZEP 1995 06 30 07 45 00 789-91 P co CCGG 93.620 -999.990 ... R7 1995 08 21 17 00 00 78.9067 11.8883 479.00 474.00 5.00 166422 ZEP 1995 06 30 07 45 00 790-91 P co CCGG 93.300 -999.990 ... R7 1995 08 21 17 16 00 78.9067 11.8883 479.00 474.00 5.00 166423 ZEP 1995 07 07 07 37 00 737-91 P co CCGG 101.490 -999.990 P.. R7 1995 08 21 18 37 00 78.9067 11.8883 479.00 474.00 5.00 166424 ZEP 1995 07 07 07 37 00 738-91 P co CCGG 96.450 -999.990 P.. R7 1995 08 21 18 53 00 78.9067 11.8883 479.00 474.00 5.00 166425 ZEP 1995 07 14 07 45 00 795-91 P co CCGG 104.660 -999.990 ... R7 1995 09 26 09 43 00 78.9067 11.8883 479.00 474.00 5.00 166426 ZEP 1995 07 14 07 45 00 796-91 P co CCGG 103.410 -999.990 ... R7 1995 09 26 10 00 00 78.9067 11.8883 479.00 474.00 5.00 166427 ZEP 1995 07 21 08 50 00 803-91 P co CCGG 99.320 -999.990 ... R7 1995 09 26 10 16 00 78.9067 11.8883 479.00 474.00 5.00 166428 ZEP 1995 07 21 08 50 00 804-91 P co CCGG 99.220 -999.990 ... R7 1995 09 26 10 32 00 78.9067 11.8883 479.00 474.00 5.00 166429 ZEP 1995 07 28 09 05 00 807-91 P co CCGG 97.880 -999.990 ... R7 1995 09 26 09 03 00 78.9067 11.8883 479.00 474.00 5.00 166430 ZEP 1995 07 28 09 05 00 808-91 P co CCGG 98.340 -999.990 ... R7 1995 09 26 09 19 00 78.9067 11.8883 479.00 474.00 5.00 166431 ZEP 1995 08 03 08 31 00 743-91 P co CCGG 109.410 -999.990 ... R7 1995 09 25 15 05 00 78.9067 11.8883 479.00 474.00 5.00 166432 ZEP 1995 08 03 08 31 00 744-91 P co CCGG 108.280 -999.990 ... R7 1995 09 25 15 21 00 78.9067 11.8883 479.00 474.00 5.00 166433 ZEP 1995 08 11 07 50 00 155-91 P co CCGG 104.640 -999.990 ... R7 1995 10 11 09 18 00 78.9067 11.8883 479.00 474.00 5.00 166434 ZEP 1995 08 11 07 50 00 156-91 P co CCGG 103.290 -999.990 ... R7 1995 10 11 09 35 00 78.9067 11.8883 479.00 474.00 5.00 166435 ZEP 1995 08 18 09 15 00 383-91 P co CCGG 104.710 -999.990 ... R7 1995 10 11 10 33 00 78.9067 11.8883 479.00 474.00 5.00 166436 ZEP 1995 08 18 09 15 00 384-91 P co CCGG 103.740 -999.990 ... R7 1995 10 11 10 49 00 78.9067 11.8883 479.00 474.00 5.00 166437 ZEP 1995 08 24 07 30 00 277-91 P co CCGG 95.580 -999.990 ... R7 1995 10 11 08 46 00 78.9067 11.8883 479.00 474.00 5.00 166438 ZEP 1995 08 24 07 30 00 278-91 P co CCGG 96.820 -999.990 ... R7 1995 10 11 09 02 00 78.9067 11.8883 479.00 474.00 5.00 166439 ZEP 1995 09 01 09 35 00 15-91 P co CCGG 101.200 -999.990 ... R7 1995 10 11 08 14 00 78.9067 11.8883 479.00 474.00 5.00 166440 ZEP 1995 09 01 09 35 00 16-91 P co CCGG 101.120 -999.990 ... R7 1995 10 11 08 30 00 78.9067 11.8883 479.00 474.00 5.00 166441 ZEP 1995 09 08 08 45 00 649-91 P co CCGG 109.290 -999.990 ... R7 1995 11 15 15 04 00 78.9067 11.8883 479.00 474.00 5.00 166442 ZEP 1995 09 08 08 45 00 650-91 P co CCGG 108.370 -999.990 ... R7 1995 11 15 15 20 00 78.9067 11.8883 479.00 474.00 5.00 166443 ZEP 1995 09 14 08 55 00 623-91 P co CCGG 109.150 -999.990 ... R7 1995 11 15 16 10 00 78.9067 11.8883 479.00 474.00 5.00 166444 ZEP 1995 09 14 08 55 00 624-91 P co CCGG 107.600 -999.990 ... R7 1995 11 15 16 26 00 78.9067 11.8883 479.00 474.00 5.00 166445 ZEP 1995 09 22 09 30 00 179-91 P co CCGG 105.290 -999.990 ... R7 1995 11 15 12 00 00 78.9067 11.8883 479.00 474.00 5.00 166446 ZEP 1995 09 22 09 30 00 180-91 P co CCGG 106.300 -999.990 ... R7 1995 11 15 12 16 00 78.9067 11.8883 479.00 474.00 5.00 166447 ZEP 1995 09 28 09 35 00 203-91 P co CCGG 117.870 -999.990 ... R7 1995 11 15 12 32 00 78.9067 11.8883 479.00 474.00 5.00 166448 ZEP 1995 09 28 09 35 00 204-91 P co CCGG 116.850 -999.990 ... R7 1995 11 15 12 48 00 78.9067 11.8883 479.00 474.00 5.00 166449 ZEP 1995 10 05 07 40 00 1303-91 P co CCGG 115.860 -999.990 ... R7 1996 01 09 14 48 00 78.9067 11.8883 479.00 474.00 5.00 166450 ZEP 1995 10 05 07 40 00 1304-91 P co CCGG 114.460 -999.990 ... R7 1996 01 09 15 04 00 78.9067 11.8883 479.00 474.00 5.00 166451 ZEP 1995 10 13 10 40 00 1327-91 P co CCGG 110.180 -999.990 ... R7 1996 01 09 14 16 00 78.9067 11.8883 479.00 474.00 5.00 166452 ZEP 1995 10 13 10 40 00 1328-91 P co CCGG 108.840 -999.990 ... R7 1996 01 09 14 32 00 78.9067 11.8883 479.00 474.00 5.00 166453 ZEP 1995 10 19 09 00 00 41-91 P co CCGG 111.050 -999.990 ... R7 1996 01 05 09 05 00 78.9067 11.8883 479.00 474.00 5.00 166454 ZEP 1995 10 19 09 00 00 42-91 P co CCGG 111.470 -999.990 ... R7 1996 01 05 09 21 00 78.9067 11.8883 479.00 474.00 5.00 166455 ZEP 1995 10 26 08 45 00 193-91 P co CCGG 119.530 -999.990 ... R7 1996 01 05 09 38 00 78.9067 11.8883 479.00 474.00 5.00 166456 ZEP 1995 10 26 08 45 00 194-91 P co CCGG 118.330 -999.990 ... R7 1996 01 05 09 54 00 78.9067 11.8883 479.00 474.00 5.00 166457 ZEP 1995 11 03 09 22 00 849-91 P co CCGG 127.190 -999.990 P.. R7 1996 01 09 13 43 00 78.9067 11.8883 479.00 474.00 5.00 166458 ZEP 1995 11 03 09 22 00 850-91 P co CCGG 130.310 -999.990 P.. R7 1996 01 09 13 59 00 78.9067 11.8883 479.00 474.00 5.00 166459 ZEP 1995 11 09 08 30 00 1173-91 P co CCGG 125.420 -999.990 ... R7 1996 01 09 13 11 00 78.9067 11.8883 479.00 474.00 5.00 166460 ZEP 1995 11 09 08 30 00 1174-91 P co CCGG 125.200 -999.990 ... R7 1996 01 09 13 27 00 78.9067 11.8883 479.00 474.00 5.00 166461 ZEP 1995 11 17 07 42 00 625-91 P co CCGG 155.630 -999.990 P.. R7 1996 03 06 11 57 00 78.9067 11.8883 479.00 474.00 5.00 166462 ZEP 1995 11 17 07 42 00 626-91 P co CCGG 132.060 -999.990 P.. R7 1996 03 06 12 13 00 78.9067 11.8883 479.00 474.00 5.00 166463 ZEP 1995 11 23 08 30 00 4-91 P co CCGG 135.220 -999.990 ... R7 1996 03 08 10 01 00 78.9067 11.8883 479.00 474.00 5.00 166464 ZEP 1995 11 30 08 50 00 797-91 P co CCGG 138.440 -999.990 ... R7 1996 03 04 16 13 00 78.9067 11.8883 479.00 474.00 5.00 166465 ZEP 1995 11 30 08 50 00 798-91 P co CCGG 136.080 -999.990 ... R7 1996 03 04 16 30 00 78.9067 11.8883 479.00 474.00 5.00 166466 ZEP 1995 12 08 08 35 00 813-91 P co CCGG 142.300 -999.990 ... R7 1996 03 04 16 46 00 78.9067 11.8883 479.00 474.00 5.00 166467 ZEP 1995 12 08 08 35 00 814-91 P co CCGG 140.660 -999.990 ... R7 1996 03 04 17 02 00 78.9067 11.8883 479.00 474.00 5.00 166468 ZEP 1995 12 14 08 30 00 537-91 P co CCGG 156.300 -999.990 ... R7 1996 03 08 16 39 00 78.9067 11.8883 479.00 474.00 5.00 166469 ZEP 1995 12 14 08 30 00 538-91 P co CCGG 155.980 -999.990 ... R7 1996 03 08 16 55 00 78.9067 11.8883 479.00 474.00 5.00 166470 ZEP 1995 12 21 07 40 00 523-91 P co CCGG 167.630 -999.990 ... R7 1996 03 08 14 53 00 78.9067 11.8883 479.00 474.00 5.00 166471 ZEP 1995 12 21 07 40 00 524-91 P co CCGG 166.420 -999.990 ... R7 1996 03 08 15 09 00 78.9067 11.8883 479.00 474.00 5.00 166472 ZEP 1995 12 29 08 48 00 259-91 P co CCGG 128.240 -999.990 .X. R7 1996 03 08 16 06 00 78.9067 11.8883 479.00 474.00 5.00 166473 ZEP 1995 12 29 08 48 00 260-91 P co CCGG 126.770 -999.990 .X. R7 1996 03 08 16 22 00 78.9067 11.8883 479.00 474.00 5.00 166474 ZEP 1996 01 04 10 00 00 837-91 P co CCGG 164.280 -999.990 ... R7 1996 03 08 18 56 00 78.9067 11.8883 479.00 474.00 5.00 166475 ZEP 1996 01 04 10 00 00 838-91 P co CCGG 163.640 -999.990 ... R7 1996 03 08 19 13 00 78.9067 11.8883 479.00 474.00 5.00 166476 ZEP 1996 01 12 09 55 00 301-91 P co CCGG 176.280 -999.990 ... R7 1996 03 04 15 08 00 78.9067 11.8883 479.00 474.00 5.00 166477 ZEP 1996 01 12 09 55 00 302-91 P co CCGG 177.410 -999.990 ... R7 1996 03 04 15 24 00 78.9067 11.8883 479.00 474.00 5.00 166478 ZEP 1996 01 18 08 50 00 521-91 P co CCGG 146.460 -999.990 ... R7 1996 03 04 15 40 00 78.9067 11.8883 479.00 474.00 5.00 166479 ZEP 1996 01 18 08 50 00 522-91 P co CCGG 147.040 -999.990 ... R7 1996 03 04 15 57 00 78.9067 11.8883 479.00 474.00 5.00 166480 ZEP 1996 02 01 10 28 00 1495-91 P co CCGG 164.270 -999.990 P.. R7 1996 05 22 12 37 00 78.9067 11.8883 479.00 474.00 5.00 166481 ZEP 1996 02 01 10 28 00 1496-91 P co CCGG 159.450 -999.990 P.. R7 1996 05 22 12 53 00 78.9067 11.8883 479.00 474.00 5.00 166482 ZEP 1996 02 16 09 15 00 809-91 P co CCGG 166.850 -999.990 ... R7 1996 05 13 11 21 00 78.9067 11.8883 479.00 474.00 5.00 166483 ZEP 1996 02 16 09 15 00 810-91 P co CCGG 166.810 -999.990 ... R7 1996 05 13 11 38 00 78.9067 11.8883 479.00 474.00 5.00 166484 ZEP 1996 02 22 09 50 00 811-91 P co CCGG 163.710 -999.990 ... R7 1996 05 13 10 49 00 78.9067 11.8883 479.00 474.00 5.00 166485 ZEP 1996 02 22 09 50 00 812-91 P co CCGG 164.680 -999.990 ... R7 1996 05 13 11 05 00 78.9067 11.8883 479.00 474.00 5.00 166486 ZEP 1996 02 29 09 30 00 785-91 P co CCGG 166.440 -999.990 ... R7 1996 05 13 12 26 00 78.9067 11.8883 479.00 474.00 5.00 166487 ZEP 1996 02 29 09 30 00 786-91 P co CCGG 164.930 -999.990 ... R7 1996 05 13 12 42 00 78.9067 11.8883 479.00 474.00 5.00 166488 ZEP 1996 03 08 09 10 00 1315-91 P co CCGG 173.370 -999.990 ... R7 1996 09 09 11 13 00 78.9067 11.8883 479.00 474.00 5.00 166489 ZEP 1996 03 08 09 10 00 1316-91 P co CCGG 171.500 -999.990 ... R7 1996 09 09 11 29 00 78.9067 11.8883 479.00 474.00 5.00 166490 ZEP 1996 03 15 09 40 00 1309-91 P co CCGG 205.320 -999.990 .X. R7 1996 09 09 12 18 00 78.9067 11.8883 479.00 474.00 5.00 166491 ZEP 1996 03 16 08 55 00 781-91 P co CCGG 162.200 -999.990 ... R7 1996 05 13 11 54 00 78.9067 11.8883 479.00 474.00 5.00 166492 ZEP 1996 03 16 08 55 00 782-91 P co CCGG 161.700 -999.990 ... R7 1996 05 13 12 10 00 78.9067 11.8883 479.00 474.00 5.00 166493 ZEP 1996 03 19 13 45 00 795-91 P co CCGG 186.720 -999.990 ... R7 1996 09 09 11 45 00 78.9067 11.8883 479.00 474.00 5.00 166494 ZEP 1996 03 19 13 45 00 796-91 P co CCGG 187.820 -999.990 ... R7 1996 09 09 12 02 00 78.9067 11.8883 479.00 474.00 5.00 166495 ZEP 1996 03 20 14 10 00 807-91 P co CCGG 171.210 -999.990 ... R7 1996 09 09 10 41 00 78.9067 11.8883 479.00 474.00 5.00 166496 ZEP 1996 03 20 14 10 00 808-91 P co CCGG 170.000 -999.990 ... R7 1996 09 09 10 57 00 78.9067 11.8883 479.00 474.00 5.00 166497 ZEP 1996 03 21 10 05 00 1190-91 P co CCGG 166.870 -999.990 ... R7 1996 09 09 09 09 00 78.9067 11.8883 479.00 474.00 5.00 166499 ZEP 1996 03 21 10 05 00 583-91 P co CCGG 168.260 -999.990 ... R7 1996 09 09 08 53 00 78.9067 11.8883 479.00 474.00 5.00 166498 ZEP 1996 03 29 10 05 00 1209-91 P co CCGG 171.290 -999.990 ... R7 1996 07 15 09 19 00 78.9067 11.8883 479.00 474.00 5.00 166500 ZEP 1996 03 29 10 05 00 1210-91 P co CCGG 172.590 -999.990 ... R7 1996 07 15 09 35 00 78.9067 11.8883 479.00 474.00 5.00 166501 ZEP 1996 04 04 08 55 00 1325-91 P co CCGG 183.560 -999.990 P.. R7 1996 07 15 15 58 00 78.9067 11.8883 479.00 474.00 5.00 166502 ZEP 1996 04 04 08 55 00 1326-91 P co CCGG 170.690 -999.990 P.. R7 1996 07 15 16 14 00 78.9067 11.8883 479.00 474.00 5.00 166503 ZEP 1996 04 12 16 30 00 735-91 P co CCGG 170.520 -999.990 ... R7 1996 07 18 09 38 00 78.9067 11.8883 479.00 474.00 5.00 166504 ZEP 1996 04 12 16 30 00 736-91 P co CCGG 173.130 -999.990 ... R7 1996 07 18 09 54 00 78.9067 11.8883 479.00 474.00 5.00 166505 ZEP 1996 04 19 09 30 00 787-91 P co CCGG 167.200 -999.990 ... R7 1996 07 18 09 05 00 78.9067 11.8883 479.00 474.00 5.00 166506 ZEP 1996 04 19 09 30 00 788-91 P co CCGG 167.170 -999.990 ... R7 1996 07 18 09 21 00 78.9067 11.8883 479.00 474.00 5.00 166507 ZEP 1996 04 25 08 35 00 783-91 P co CCGG 159.170 -999.990 ... R7 1996 07 15 13 52 00 78.9067 11.8883 479.00 474.00 5.00 166508 ZEP 1996 04 25 08 35 00 784-91 P co CCGG 160.690 -999.990 ... R7 1996 07 15 14 08 00 78.9067 11.8883 479.00 474.00 5.00 166509 ZEP 1996 05 02 10 15 00 743-91 P co CCGG 164.850 -999.990 ... R7 1996 07 16 10 27 00 78.9067 11.8883 479.00 474.00 5.00 166510 ZEP 1996 05 02 10 15 00 744-91 P co CCGG 162.750 -999.990 ... R7 1996 07 16 10 43 00 78.9067 11.8883 479.00 474.00 5.00 166511 ZEP 1996 05 09 08 20 00 803-91 P co CCGG 157.790 -999.990 ... R7 1996 07 16 08 46 00 78.9067 11.8883 479.00 474.00 5.00 166512 ZEP 1996 05 09 08 20 00 804-91 P co CCGG 159.110 -999.990 ... R7 1996 07 16 09 02 00 78.9067 11.8883 479.00 474.00 5.00 166513 ZEP 1996 05 16 08 45 00 813-91 P co CCGG 143.980 -999.990 ... R7 1996 07 16 09 54 00 78.9067 11.8883 479.00 474.00 5.00 166514 ZEP 1996 05 16 08 45 00 814-91 P co CCGG 142.450 -999.990 ... R7 1996 07 16 10 10 00 78.9067 11.8883 479.00 474.00 5.00 166515 ZEP 1996 05 24 09 35 00 805-91 P co CCGG 137.470 -999.990 ... R7 1996 07 15 10 25 00 78.9067 11.8883 479.00 474.00 5.00 166516 ZEP 1996 05 24 09 35 00 806-91 P co CCGG 136.840 -999.990 ... R7 1996 07 15 10 41 00 78.9067 11.8883 479.00 474.00 5.00 166517 ZEP 1996 05 30 08 45 00 341-91 P co CCGG 133.230 -999.990 P.. R7 1996 07 15 09 52 00 78.9067 11.8883 479.00 474.00 5.00 166518 ZEP 1996 05 30 08 45 00 342-91 P co CCGG 221.110 -999.990 P.. R7 1996 07 15 10 08 00 78.9067 11.8883 479.00 474.00 5.00 166519 ZEP 1996 06 06 09 15 00 1413-91 P co CCGG 128.750 -999.990 ... R7 1996 07 15 08 47 00 78.9067 11.8883 479.00 474.00 5.00 166520 ZEP 1996 06 06 09 15 00 1414-91 P co CCGG 127.550 -999.990 ... R7 1996 07 15 09 03 00 78.9067 11.8883 479.00 474.00 5.00 166521 ZEP 1996 06 09 21 05 00 739-91 P co CCGG 127.480 -999.990 ... R7 1996 09 16 09 35 00 78.9067 11.8883 479.00 474.00 5.00 166522 ZEP 1996 06 09 21 05 00 740-91 P co CCGG 127.030 -999.990 ... R7 1996 09 16 09 51 00 78.9067 11.8883 479.00 474.00 5.00 166523 ZEP 1996 06 10 23 10 00 793-91 P co CCGG 123.600 -999.990 P.. R7 1996 09 16 08 30 00 78.9067 11.8883 479.00 474.00 5.00 166524 ZEP 1996 06 10 23 10 00 794-91 P co CCGG 134.400 -999.990 P.. R7 1996 09 16 08 46 00 78.9067 11.8883 479.00 474.00 5.00 166525 ZEP 1996 06 12 19 30 00 733-91 P co CCGG 122.640 -999.990 ... R7 1996 09 09 08 21 00 78.9067 11.8883 479.00 474.00 5.00 166526 ZEP 1996 06 12 19 30 00 734-91 P co CCGG 122.440 -999.990 ... R7 1996 09 09 08 37 00 78.9067 11.8883 479.00 474.00 5.00 166527 ZEP 1996 06 14 09 30 00 801-91 P co CCGG 118.800 -999.990 P.. R7 1996 09 06 13 10 00 78.9067 11.8883 479.00 474.00 5.00 166528 ZEP 1996 06 14 09 30 00 802-91 P co CCGG 130.200 -999.990 P.. R7 1996 09 06 13 27 00 78.9067 11.8883 479.00 474.00 5.00 166529 ZEP 1996 06 16 07 55 00 815-91 P co CCGG 119.150 -999.990 P.. R7 1996 09 09 14 03 00 78.9067 11.8883 479.00 474.00 5.00 166530 ZEP 1996 06 16 07 55 00 816-91 P co CCGG 115.340 -999.990 P.. R7 1996 09 09 14 19 00 78.9067 11.8883 479.00 474.00 5.00 166531 ZEP 1996 06 17 08 40 00 791-91 P co CCGG 110.600 -999.990 ... R7 1996 09 09 14 36 00 78.9067 11.8883 479.00 474.00 5.00 166532 ZEP 1996 06 17 08 40 00 792-91 P co CCGG 111.200 -999.990 ... R7 1996 09 09 14 52 00 78.9067 11.8883 479.00 474.00 5.00 166533 ZEP 1996 06 18 08 40 00 927-91 P co CCGG 114.710 -999.990 ... R7 1996 09 16 10 14 00 78.9067 11.8883 479.00 474.00 5.00 166534 ZEP 1996 06 18 08 40 00 928-91 P co CCGG 115.240 -999.990 ... R7 1996 09 16 10 30 00 78.9067 11.8883 479.00 474.00 5.00 166535 ZEP 1996 06 19 09 50 00 799-91 P co CCGG 112.040 -999.990 ... R7 1996 09 09 13 31 00 78.9067 11.8883 479.00 474.00 5.00 166536 ZEP 1996 06 19 09 50 00 800-91 P co CCGG 113.210 -999.990 ... R7 1996 09 09 13 47 00 78.9067 11.8883 479.00 474.00 5.00 166537 ZEP 1996 06 20 08 30 00 747-91 P co CCGG 112.300 -999.990 ... R7 1996 09 09 12 59 00 78.9067 11.8883 479.00 474.00 5.00 166538 ZEP 1996 06 20 08 30 00 748-91 P co CCGG 113.260 -999.990 ... R7 1996 09 09 13 15 00 78.9067 11.8883 479.00 474.00 5.00 166539 ZEP 1996 06 22 16 40 00 737-91 P co CCGG 113.780 -999.990 ... R7 1996 09 09 09 25 00 78.9067 11.8883 479.00 474.00 5.00 166540 ZEP 1996 06 22 16 40 00 738-91 P co CCGG 112.430 -999.990 ... R7 1996 09 09 09 42 00 78.9067 11.8883 479.00 474.00 5.00 166541 ZEP 1996 06 23 07 45 00 789-91 P co CCGG 114.870 -999.990 ... R7 1996 09 09 09 58 00 78.9067 11.8883 479.00 474.00 5.00 166542 ZEP 1996 06 23 07 45 00 790-91 P co CCGG 114.440 -999.990 ... R7 1996 09 09 10 14 00 78.9067 11.8883 479.00 474.00 5.00 166543 ZEP 1996 06 23 19 10 00 745-91 P co CCGG 112.590 -999.990 ... R7 1996 09 16 09 03 00 78.9067 11.8883 479.00 474.00 5.00 166544 ZEP 1996 06 23 19 10 00 746-91 P co CCGG 110.610 -999.990 ... R7 1996 09 16 09 19 00 78.9067 11.8883 479.00 474.00 5.00 166545 ZEP 1996 06 24 08 30 00 741-91 P co CCGG 110.580 -999.990 ... R7 1996 09 16 11 50 00 78.9067 11.8883 479.00 474.00 5.00 166546 ZEP 1996 06 24 08 30 00 742-91 P co CCGG 109.500 -999.990 ... R7 1996 09 16 12 07 00 78.9067 11.8883 479.00 474.00 5.00 166547 ZEP 1996 06 25 13 50 00 835-91 P co CCGG 108.420 -999.990 ... R7 1996 09 13 14 28 00 78.9067 11.8883 479.00 474.00 5.00 166548 ZEP 1996 06 25 13 50 00 836-91 P co CCGG 108.650 -999.990 ... R7 1996 09 13 14 44 00 78.9067 11.8883 479.00 474.00 5.00 166549 ZEP 1996 06 26 13 05 00 127-91 P co CCGG 110.850 -999.990 ... R7 1996 09 13 15 34 00 78.9067 11.8883 479.00 474.00 5.00 166550 ZEP 1996 06 26 13 05 00 128-91 P co CCGG 108.050 -999.990 ... R7 1996 09 13 15 50 00 78.9067 11.8883 479.00 474.00 5.00 166551 ZEP 1996 06 28 08 30 00 273-91 P co CCGG 106.370 -999.990 ... R7 1996 09 13 16 06 00 78.9067 11.8883 479.00 474.00 5.00 166552 ZEP 1996 06 28 08 30 00 274-91 P co CCGG 104.810 -999.990 ... R7 1996 09 13 16 23 00 78.9067 11.8883 479.00 474.00 5.00 166553 ZEP 1996 07 05 09 25 00 1735-91 P co CCGG 104.600 -999.990 ... R7 1996 09 13 08 06 00 78.9067 11.8883 479.00 474.00 5.00 166554 ZEP 1996 07 05 09 25 00 1736-91 P co CCGG 104.380 -999.990 ... R7 1996 09 13 08 22 00 78.9067 11.8883 479.00 474.00 5.00 166555 ZEP 1996 07 11 09 07 00 821-91 P co CCGG 102.500 -999.990 ... R7 1996 09 13 12 38 00 78.9067 11.8883 479.00 474.00 5.00 166556 ZEP 1996 07 18 09 15 00 1487-91 P co CCGG 95.970 -999.990 ... R7 1996 09 10 09 45 00 78.9067 11.8883 479.00 474.00 5.00 166557 ZEP 1996 07 18 09 15 00 1488-91 P co CCGG 95.900 -999.990 ... R7 1996 09 10 10 01 00 78.9067 11.8883 479.00 474.00 5.00 166558 ZEP 1996 07 25 09 05 00 849-91 P co CCGG 94.140 -999.990 P.. R7 1996 09 10 10 17 00 78.9067 11.8883 479.00 474.00 5.00 166559 ZEP 1996 07 25 09 05 00 850-91 P co CCGG 99.790 -999.990 P.. R7 1996 09 10 10 33 00 78.9067 11.8883 479.00 474.00 5.00 166560 ZEP 1996 08 02 08 48 00 811-91 P co CCGG 317.800 -999.990 .XC R7 1996 11 01 09 07 00 78.9067 11.8883 479.00 474.00 5.00 166561 ZEP 1996 08 02 08 48 00 812-91 P co CCGG 318.300 -999.990 .XC R7 1996 11 01 09 23 00 78.9067 11.8883 479.00 474.00 5.00 166562 ZEP 1996 08 08 07 57 00 781-91 P co CCGG 108.450 -999.990 P.. R7 1996 11 01 07 29 00 78.9067 11.8883 479.00 474.00 5.00 166563 ZEP 1996 08 08 07 57 00 782-91 P co CCGG 104.430 -999.990 P.. R7 1996 11 01 07 45 00 78.9067 11.8883 479.00 474.00 5.00 166564 ZEP 1996 08 15 09 25 00 809-91 P co CCGG 98.120 -999.990 ... R7 1996 10 31 13 43 00 78.9067 11.8883 479.00 474.00 5.00 166565 ZEP 1996 08 15 09 25 00 810-91 P co CCGG 96.280 -999.990 ... R7 1996 10 31 14 00 00 78.9067 11.8883 479.00 474.00 5.00 166566 ZEP 1996 08 22 08 24 00 785-91 P co CCGG 99.220 -999.990 ... R7 1996 10 31 14 16 00 78.9067 11.8883 479.00 474.00 5.00 166567 ZEP 1996 08 22 08 24 00 786-91 P co CCGG 97.890 -999.990 ... R7 1996 10 31 14 32 00 78.9067 11.8883 479.00 474.00 5.00 166568 ZEP 1996 08 31 09 00 00 783-91 P co CCGG 115.060 -999.990 P.. R7 1996 10 31 14 49 00 78.9067 11.8883 479.00 474.00 5.00 166569 ZEP 1996 08 31 09 00 00 784-91 P co CCGG 112.100 -999.990 P.. R7 1996 10 31 15 05 00 78.9067 11.8883 479.00 474.00 5.00 166570 ZEP 1996 09 05 07 45 00 805-91 P co CCGG 119.360 -999.990 ... R7 1996 10 31 13 11 00 78.9067 11.8883 479.00 474.00 5.00 166571 ZEP 1996 09 05 07 45 00 806-91 P co CCGG 118.690 -999.990 ... R7 1996 10 31 13 27 00 78.9067 11.8883 479.00 474.00 5.00 166572 ZEP 1996 09 13 09 35 00 691-91 P co CCGG 115.710 -999.990 ... R7 1996 11 01 08 02 00 78.9067 11.8883 479.00 474.00 5.00 166573 ZEP 1996 09 13 09 35 00 692-91 P co CCGG 114.590 -999.990 ... R7 1996 11 01 08 18 00 78.9067 11.8883 479.00 474.00 5.00 166574 ZEP 1996 09 19 08 46 00 855-91 P co CCGG 115.760 -999.990 ... R7 1996 11 01 08 34 00 78.9067 11.8883 479.00 474.00 5.00 166575 ZEP 1996 09 19 08 46 00 856-91 P co CCGG 116.070 -999.990 ... R7 1996 11 01 08 50 00 78.9067 11.8883 479.00 474.00 5.00 166576 ZEP 1996 09 26 08 35 00 813-91 P co CCGG 115.700 -999.990 ... R7 1997 01 17 09 31 00 78.9067 11.8883 479.00 474.00 5.00 166577 ZEP 1996 09 26 08 35 00 814-91 P co CCGG 115.310 -999.990 ... R7 1997 01 17 09 47 00 78.9067 11.8883 479.00 474.00 5.00 166578 ZEP 1996 10 03 08 30 00 803-91 P co CCGG 119.280 -999.990 ... R7 1997 01 17 08 59 00 78.9067 11.8883 479.00 474.00 5.00 166579 ZEP 1996 10 03 08 30 00 804-91 P co CCGG 119.950 -999.990 ... R7 1997 01 17 09 15 00 78.9067 11.8883 479.00 474.00 5.00 166580 ZEP 1996 10 10 07 55 00 1209-91 P co CCGG 125.830 -999.990 ... R7 1997 01 17 10 41 00 78.9067 11.8883 479.00 474.00 5.00 166581 ZEP 1996 10 10 07 55 00 1210-91 P co CCGG 125.430 -999.990 ... R7 1997 01 17 10 57 00 78.9067 11.8883 479.00 474.00 5.00 166582 ZEP 1996 10 17 08 30 00 63-91 P co CCGG 119.980 -999.990 ... R7 1997 01 15 10 08 00 78.9067 11.8883 479.00 474.00 5.00 166583 ZEP 1996 10 17 08 30 00 64-91 P co CCGG 120.040 -999.990 ... R7 1997 01 15 10 24 00 78.9067 11.8883 479.00 474.00 5.00 166584 ZEP 1996 10 24 08 45 00 1155-91 P co CCGG 123.540 -999.990 ... R7 1997 01 15 14 19 00 78.9067 11.8883 479.00 474.00 5.00 166585 ZEP 1996 10 24 08 45 00 1156-91 P co CCGG 121.980 -999.990 ... R7 1997 01 15 14 35 00 78.9067 11.8883 479.00 474.00 5.00 166586 ZEP 1996 11 01 09 55 00 1743-91 P co CCGG 127.120 -999.990 ... R7 1997 01 15 13 00 00 78.9067 11.8883 479.00 474.00 5.00 166587 ZEP 1996 11 01 09 55 00 1744-91 P co CCGG 126.760 -999.990 ... R7 1997 01 15 13 16 00 78.9067 11.8883 479.00 474.00 5.00 166588 ZEP 1996 11 07 08 35 00 802-91 P co CCGG 132.060 -999.990 ... R7 1997 01 16 12 54 00 78.9067 11.8883 479.00 474.00 5.00 166589 ZEP 1996 11 15 13 30 00 799-91 P co CCGG 141.560 -999.990 ... R7 1997 01 14 14 31 00 78.9067 11.8883 479.00 474.00 5.00 166590 ZEP 1996 11 15 13 30 00 800-91 P co CCGG 143.810 -999.990 ... R7 1997 01 14 14 48 00 78.9067 11.8883 479.00 474.00 5.00 166591 ZEP 1996 11 22 09 55 00 793-91 P co CCGG 142.060 -999.990 ... R7 1997 03 21 09 26 00 78.9067 11.8883 479.00 474.00 5.00 166592 ZEP 1996 11 22 09 55 00 794-91 P co CCGG 139.560 -999.990 ... R7 1997 03 21 09 42 00 78.9067 11.8883 479.00 474.00 5.00 166593 ZEP 1996 11 28 08 20 00 733-91 P co CCGG 132.400 -999.990 ... R7 1997 03 21 08 53 00 78.9067 11.8883 479.00 474.00 5.00 166594 ZEP 1996 11 28 08 20 00 734-91 P co CCGG 129.990 -999.990 ... R7 1997 03 21 09 09 00 78.9067 11.8883 479.00 474.00 5.00 166595 ZEP 1996 12 05 09 00 00 2043-91 P co CCGG 140.510 -999.990 ... R7 1997 03 19 10 39 00 78.9067 11.8883 479.00 474.00 5.00 166596 ZEP 1996 12 05 09 00 00 2044-91 P co CCGG 141.040 -999.990 ... R7 1997 03 19 10 55 00 78.9067 11.8883 479.00 474.00 5.00 166597 ZEP 1996 12 12 09 00 00 2039-91 P co CCGG 145.260 -999.990 ... R7 1997 03 19 11 11 00 78.9067 11.8883 479.00 474.00 5.00 166598 ZEP 1996 12 12 09 00 00 2040-91 P co CCGG 143.130 -999.990 ... R7 1997 03 19 11 27 00 78.9067 11.8883 479.00 474.00 5.00 166599 ZEP 1996 12 19 09 30 00 795-91 P co CCGG 137.080 -999.990 P.. R7 1997 03 20 08 20 00 78.9067 11.8883 479.00 474.00 5.00 166600 ZEP 1996 12 19 09 30 00 796-91 P co CCGG 141.080 -999.990 P.. R7 1997 03 20 08 36 00 78.9067 11.8883 479.00 474.00 5.00 166601 ZEP 1996 12 26 08 45 00 789-91 P co CCGG 146.400 -999.990 P.. R7 1997 03 20 09 56 00 78.9067 11.8883 479.00 474.00 5.00 166602 ZEP 1996 12 26 08 45 00 790-91 P co CCGG 260.270 -999.990 P.C R7 1997 03 20 10 13 00 78.9067 11.8883 479.00 474.00 5.00 166603 ZEP 1997 01 03 08 40 00 811-91 P co CCGG 162.720 -999.990 ... R7 1997 03 19 12 20 00 78.9067 11.8883 479.00 474.00 5.00 166604 ZEP 1997 01 03 08 40 00 812-91 P co CCGG 162.900 -999.990 ... R7 1997 03 19 12 36 00 78.9067 11.8883 479.00 474.00 5.00 166605 ZEP 1997 01 09 09 50 00 739-91 P co CCGG 160.500 -999.990 ... R7 1997 03 19 12 52 00 78.9067 11.8883 479.00 474.00 5.00 166606 ZEP 1997 01 09 09 50 00 740-91 P co CCGG 159.960 -999.990 ... R7 1997 03 19 13 08 00 78.9067 11.8883 479.00 474.00 5.00 166607 ZEP 1997 01 16 08 45 00 783-91 P co CCGG 204.420 -999.990 .X. R7 1997 04 18 14 19 00 78.9067 11.8883 479.00 474.00 5.00 166608 ZEP 1997 01 16 08 45 00 784-91 P co CCGG 204.240 -999.990 .X. R7 1997 04 18 14 35 00 78.9067 11.8883 479.00 474.00 5.00 166609 ZEP 1997 01 24 09 30 00 785-91 P co CCGG 155.910 -999.990 ... R7 1997 04 18 14 51 00 78.9067 11.8883 479.00 474.00 5.00 166610 ZEP 1997 01 24 09 30 00 786-91 P co CCGG 156.480 -999.990 ... R7 1997 04 18 15 07 00 78.9067 11.8883 479.00 474.00 5.00 166611 ZEP 1997 01 30 09 45 00 703-91 P co CCGG 163.410 -999.990 ... R7 1997 04 18 12 37 00 78.9067 11.8883 479.00 474.00 5.00 166612 ZEP 1997 01 30 09 45 00 704-91 P co CCGG 162.560 -999.990 ... R7 1997 04 18 12 53 00 78.9067 11.8883 479.00 474.00 5.00 166613 ZEP 1997 02 06 09 20 00 7-91 P co CCGG 196.990 -999.990 .X. R7 1997 04 18 11 32 00 78.9067 11.8883 479.00 474.00 5.00 166614 ZEP 1997 02 06 09 20 00 8-91 P co CCGG 197.000 -999.990 .X. R7 1997 04 18 11 48 00 78.9067 11.8883 479.00 474.00 5.00 166615 ZEP 1997 02 14 09 25 00 809-91 P co CCGG 180.050 -999.990 ... R7 1997 04 18 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166616 ZEP 1997 02 14 09 25 00 810-91 P co CCGG 181.170 -999.990 ... R7 1997 04 18 13 25 00 78.9067 11.8883 479.00 474.00 5.00 166617 ZEP 1997 02 22 09 55 00 805-91 P co CCGG 179.120 -999.990 ... R7 1997 04 18 10 46 00 78.9067 11.8883 479.00 474.00 5.00 166618 ZEP 1997 02 22 09 55 00 806-91 P co CCGG 177.610 -999.990 ... R7 1997 04 18 11 02 00 78.9067 11.8883 479.00 474.00 5.00 166619 ZEP 1997 02 27 08 45 00 53-91 P co CCGG 211.150 -999.990 .X. R7 1997 04 18 12 05 00 78.9067 11.8883 479.00 474.00 5.00 166620 ZEP 1997 02 27 08 45 00 54-91 P co CCGG 213.120 -999.990 .X. R7 1997 04 18 12 21 00 78.9067 11.8883 479.00 474.00 5.00 166621 ZEP 1997 03 06 09 59 00 1072-91 P co CCGG 170.010 -999.990 ... R7 1997 04 18 15 39 00 78.9067 11.8883 479.00 474.00 5.00 166622 ZEP 1997 03 21 09 35 00 627-91 P co CCGG 182.170 -999.990 ... R7 1997 05 29 12 24 00 78.9067 11.8883 479.00 474.00 5.00 166623 ZEP 1997 03 21 09 35 00 628-91 P co CCGG 178.790 -999.990 Z.. R5 1997 05 30 12 47 00 78.9067 11.8883 479.00 474.00 5.00 166624 ZEP 1997 03 21 09 35 00 628-91 P co CCGG 181.970 -999.990 Z.. R7 1997 05 29 12 41 00 78.9067 11.8883 479.00 474.00 5.00 166624 ZEP 1997 03 27 09 00 00 1915-91 P co CCGG 171.280 -999.990 ... R7 1997 05 29 12 57 00 78.9067 11.8883 479.00 474.00 5.00 166625 ZEP 1997 03 27 09 00 00 1916-91 P co CCGG 170.060 -999.990 ... R5 1997 05 30 13 14 00 78.9067 11.8883 479.00 474.00 5.00 166626 ZEP 1997 03 27 09 00 00 1916-91 P co CCGG 170.790 -999.990 ... R7 1997 05 29 13 13 00 78.9067 11.8883 479.00 474.00 5.00 166626 ZEP 1997 04 03 08 50 00 1321-91 P co CCGG 168.740 -999.990 ... R7 1997 06 18 09 38 00 78.9067 11.8883 479.00 474.00 5.00 166627 ZEP 1997 04 03 08 50 00 1322-91 P co CCGG 171.320 -999.990 ... R5 1997 06 18 14 51 00 78.9067 11.8883 479.00 474.00 5.00 166628 ZEP 1997 04 03 08 50 00 1322-91 P co CCGG 170.020 -999.990 ... R7 1997 06 18 09 54 00 78.9067 11.8883 479.00 474.00 5.00 166628 ZEP 1997 04 10 08 30 00 75-91 P co CCGG 159.080 -999.990 ... R7 1997 06 18 10 10 00 78.9067 11.8883 479.00 474.00 5.00 166629 ZEP 1997 04 10 08 30 00 76-91 P co CCGG 159.280 -999.990 ... R5 1997 06 18 14 24 00 78.9067 11.8883 479.00 474.00 5.00 166630 ZEP 1997 04 10 08 30 00 76-91 P co CCGG 161.370 -999.990 ... R7 1997 06 18 10 27 00 78.9067 11.8883 479.00 474.00 5.00 166630 ZEP 1997 04 10 09 35 00 803-91 P co CCGG 194.160 -999.990 .X. R7 1997 06 05 12 33 00 78.9067 11.8883 479.00 474.00 5.00 166631 ZEP 1997 04 10 09 35 00 804-91 P co CCGG 196.180 -999.990 Z.. R5 1997 06 06 10 40 00 78.9067 11.8883 479.00 474.00 5.00 166632 ZEP 1997 04 10 09 35 00 804-91 P co CCGG 195.340 -999.990 Z.. R7 1997 06 05 12 49 00 78.9067 11.8883 479.00 474.00 5.00 166632 ZEP 1997 04 17 08 35 00 197-91 P co CCGG 166.890 -999.990 ... R7 1997 06 05 08 31 00 78.9067 11.8883 479.00 474.00 5.00 166633 ZEP 1997 04 17 08 35 00 198-91 P co CCGG 165.780 -999.990 ... R5 1997 06 06 12 58 00 78.9067 11.8883 479.00 474.00 5.00 166634 ZEP 1997 04 17 08 35 00 198-91 P co CCGG 166.740 -999.990 ... R7 1997 06 05 08 47 00 78.9067 11.8883 479.00 474.00 5.00 166634 ZEP 1997 04 17 10 30 00 813-91 P co CCGG 177.480 -999.990 ... R7 1997 06 05 13 05 00 78.9067 11.8883 479.00 474.00 5.00 166635 ZEP 1997 04 17 10 30 00 814-91 P co CCGG 176.930 -999.990 ... R5 1997 06 06 12 17 00 78.9067 11.8883 479.00 474.00 5.00 166636 ZEP 1997 04 17 10 30 00 814-91 P co CCGG 177.990 -999.990 ... R7 1997 06 05 13 21 00 78.9067 11.8883 479.00 474.00 5.00 166636 ZEP 1997 04 25 13 35 00 1677-91 P co CCGG 167.900 -999.990 ... R7 1997 06 05 10 07 00 78.9067 11.8883 479.00 474.00 5.00 166637 ZEP 1997 04 25 13 35 00 1678-91 P co CCGG 168.720 -999.990 ... R5 1997 06 06 12 44 00 78.9067 11.8883 479.00 474.00 5.00 166638 ZEP 1997 04 25 13 35 00 1678-91 P co CCGG 168.020 -999.990 ... R7 1997 06 05 10 24 00 78.9067 11.8883 479.00 474.00 5.00 166638 ZEP 1997 05 02 08 15 00 4191-91 P co CCGG 162.120 -999.990 ... R7 1997 06 23 08 04 00 78.9067 11.8883 479.00 474.00 5.00 166639 ZEP 1997 05 02 08 15 00 4192-91 P co CCGG 162.900 -999.990 ... R5 1997 06 23 14 47 00 78.9067 11.8883 479.00 474.00 5.00 166640 ZEP 1997 05 02 08 15 00 4192-91 P co CCGG 161.990 -999.990 ... R7 1997 06 23 08 20 00 78.9067 11.8883 479.00 474.00 5.00 166640 ZEP 1997 05 08 07 25 00 4189-91 P co CCGG 166.350 -999.990 ... R7 1997 06 23 08 36 00 78.9067 11.8883 479.00 474.00 5.00 166641 ZEP 1997 05 08 07 25 00 4190-91 P co CCGG 164.340 -999.990 ... R5 1997 06 23 14 33 00 78.9067 11.8883 479.00 474.00 5.00 166642 ZEP 1997 05 08 07 25 00 4190-91 P co CCGG 163.980 -999.990 ... R7 1997 06 23 08 52 00 78.9067 11.8883 479.00 474.00 5.00 166642 ZEP 1997 05 15 08 25 00 1175-91 P co CCGG 160.650 -999.990 P.. R7 1997 06 19 14 38 00 78.9067 11.8883 479.00 474.00 5.00 166643 ZEP 1997 05 15 08 25 00 1176-91 P co CCGG 146.540 -999.990 P.. R5 1997 06 23 10 02 00 78.9067 11.8883 479.00 474.00 5.00 166644 ZEP 1997 05 15 08 25 00 1176-91 P co CCGG 148.990 -999.990 P.. R7 1997 06 19 14 54 00 78.9067 11.8883 479.00 474.00 5.00 166644 ZEP 1997 05 22 13 30 00 449-91 P co CCGG 134.320 -999.990 ... R7 1997 06 19 14 06 00 78.9067 11.8883 479.00 474.00 5.00 166645 ZEP 1997 05 22 13 30 00 450-91 P co CCGG 133.680 -999.990 ... R5 1997 06 23 09 48 00 78.9067 11.8883 479.00 474.00 5.00 166646 ZEP 1997 05 22 13 30 00 450-91 P co CCGG 133.220 -999.990 ... R7 1997 06 19 14 22 00 78.9067 11.8883 479.00 474.00 5.00 166646 ZEP 1997 05 29 08 10 00 5-91 P co CCGG 129.510 -999.990 P.. R5 1997 08 15 14 58 00 78.9067 11.8883 479.00 474.00 5.00 166647 ZEP 1997 05 29 08 10 00 6-91 P co CCGG 122.120 -999.990 P.. R5 1997 08 15 15 12 00 78.9067 11.8883 479.00 474.00 5.00 166648 ZEP 1997 06 06 09 35 00 527-91 P co CCGG 115.670 -999.990 P.. R5 1997 08 15 15 53 00 78.9067 11.8883 479.00 474.00 5.00 166649 ZEP 1997 06 06 09 35 00 528-91 P co CCGG 123.010 -999.990 P.. R5 1997 08 15 16 07 00 78.9067 11.8883 479.00 474.00 5.00 166650 ZEP 1997 06 12 07 38 00 1983-91 P co CCGG 111.040 -999.990 *.. R7 1997 08 04 13 20 00 78.9067 11.8883 479.00 474.00 5.00 166651 ZEP 1997 06 12 07 38 00 1984-91 P co CCGG 110.870 -999.990 *.. R7 1997 08 04 13 36 00 78.9067 11.8883 479.00 474.00 5.00 166652 ZEP 1997 06 19 06 55 00 1247-91 P co CCGG 106.430 -999.990 *.. R7 1997 07 22 13 36 00 78.9067 11.8883 479.00 474.00 5.00 166653 ZEP 1997 06 19 06 55 00 1248-91 P co CCGG 108.040 -999.990 ... R5 1997 07 23 14 04 00 78.9067 11.8883 479.00 474.00 5.00 166654 ZEP 1997 06 19 06 55 00 1248-91 P co CCGG 106.110 -999.990 *.. R7 1997 07 22 13 53 00 78.9067 11.8883 479.00 474.00 5.00 166654 ZEP 1997 06 26 08 00 00 1719-91 P co CCGG 99.710 -999.990 *.. R7 1997 07 22 14 09 00 78.9067 11.8883 479.00 474.00 5.00 166655 ZEP 1997 06 26 08 00 00 1720-91 P co CCGG 98.280 -999.990 ... R5 1997 07 23 13 50 00 78.9067 11.8883 479.00 474.00 5.00 166656 ZEP 1997 06 26 08 00 00 1720-91 P co CCGG 98.840 -999.990 *.. R7 1997 07 22 14 25 00 78.9067 11.8883 479.00 474.00 5.00 166656 ZEP 1997 07 03 07 00 00 733-91 P co CCGG 89.210 -999.990 ... R5 1997 08 29 10 46 00 78.9067 11.8883 479.00 474.00 5.00 166657 ZEP 1997 07 03 07 00 00 734-91 P co CCGG 89.840 -999.990 ... R5 1997 08 29 11 00 00 78.9067 11.8883 479.00 474.00 5.00 166658 ZEP 1997 07 10 07 50 00 795-91 P co CCGG 96.550 -999.990 ... R5 1997 08 08 11 48 00 78.9067 11.8883 479.00 474.00 5.00 166659 ZEP 1997 07 10 07 50 00 796-91 P co CCGG 97.410 -999.990 ... R5 1997 08 08 11 59 00 78.9067 11.8883 479.00 474.00 5.00 166660 ZEP 1997 07 17 08 55 00 801-91 P co CCGG 92.640 -999.990 ... R5 1997 08 11 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166661 ZEP 1997 07 17 08 55 00 802-91 P co CCGG 92.130 -999.990 ... R5 1997 08 11 13 19 00 78.9067 11.8883 479.00 474.00 5.00 166662 ZEP 1997 07 24 07 05 00 793-91 P co CCGG 78.240 -999.990 ... R5 1997 08 29 10 19 00 78.9067 11.8883 479.00 474.00 5.00 166663 ZEP 1997 07 24 07 05 00 794-91 P co CCGG 79.510 -999.990 ... R5 1997 08 29 10 32 00 78.9067 11.8883 479.00 474.00 5.00 166664 ZEP 1997 07 31 06 50 00 1915-91 P co CCGG 86.210 -999.990 ... R5 1997 09 03 08 37 00 78.9067 11.8883 479.00 474.00 5.00 166665 ZEP 1997 07 31 06 50 00 1916-91 P co CCGG 86.100 -999.990 ... R5 1997 09 03 08 51 00 78.9067 11.8883 479.00 474.00 5.00 166666 ZEP 1997 08 08 08 08 00 1061-91 P co CCGG 79.500 -999.990 ... R5 1997 09 02 14 30 00 78.9067 11.8883 479.00 474.00 5.00 166667 ZEP 1997 08 08 08 08 00 1062-91 P co CCGG 80.590 -999.990 ... R5 1997 09 02 14 44 00 78.9067 11.8883 479.00 474.00 5.00 166668 ZEP 1997 09 04 07 10 00 813-91 P co CCGG 83.180 -999.990 ... R5 1997 09 30 09 23 00 78.9067 11.8883 479.00 474.00 5.00 166669 ZEP 1997 09 04 07 10 00 814-91 P co CCGG 83.700 -999.990 ... R5 1997 09 30 09 37 00 78.9067 11.8883 479.00 474.00 5.00 166670 ZEP 1997 09 11 07 20 00 803-91 P co CCGG 81.430 -999.990 ... R5 1997 09 30 11 39 00 78.9067 11.8883 479.00 474.00 5.00 166671 ZEP 1997 09 11 07 20 00 804-91 P co CCGG 81.380 -999.990 ... R5 1997 09 30 11 52 00 78.9067 11.8883 479.00 474.00 5.00 166672 ZEP 1997 09 25 08 34 00 4441-91 P co CCGG 99.080 -999.990 ... R5 1997 11 14 12 45 00 78.9067 11.8883 479.00 474.00 5.00 166673 ZEP 1997 09 25 08 34 00 4442-91 P co CCGG 100.240 -999.990 ... R5 1997 11 14 12 59 00 78.9067 11.8883 479.00 474.00 5.00 166674 ZEP 1997 10 01 12 37 00 506-91 P co CCGG 101.250 -999.990 ... R5 1997 11 03 13 53 00 78.9067 11.8883 479.00 474.00 5.00 166675 ZEP 1997 10 01 12 37 00 745-91 P co CCGG 102.010 -999.990 ... R5 1997 11 03 13 40 00 78.9067 11.8883 479.00 474.00 5.00 166676 ZEP 1997 10 02 08 36 00 127-91 P co CCGG 101.030 -999.990 P.. R5 1997 11 14 13 41 00 78.9067 11.8883 479.00 474.00 5.00 166677 ZEP 1997 10 02 08 36 00 128-91 P co CCGG 98.090 -999.990 P.. R5 1997 11 14 13 54 00 78.9067 11.8883 479.00 474.00 5.00 166678 ZEP 1997 10 09 08 15 00 4413-91 P co CCGG 102.030 -999.990 ... R5 1997 11 14 14 07 00 78.9067 11.8883 479.00 474.00 5.00 166679 ZEP 1997 10 09 08 15 00 4414-91 P co CCGG 101.120 -999.990 ... R5 1997 11 14 14 21 00 78.9067 11.8883 479.00 474.00 5.00 166680 ZEP 1997 10 16 07 40 00 523-91 P co CCGG 103.420 -999.990 ... R5 1997 11 14 13 12 00 78.9067 11.8883 479.00 474.00 5.00 166681 ZEP 1997 10 16 07 40 00 524-91 P co CCGG 101.810 -999.990 ... R5 1997 11 14 13 26 00 78.9067 11.8883 479.00 474.00 5.00 166682 ZEP 1997 11 06 07 55 00 4401-91 P co CCGG 128.870 -999.990 ... R5 1997 12 17 10 10 00 78.9067 11.8883 479.00 474.00 5.00 166683 ZEP 1997 11 06 07 55 00 4402-91 P co CCGG 128.370 -999.990 ... R5 1997 12 17 10 23 00 78.9067 11.8883 479.00 474.00 5.00 166684 ZEP 1997 11 13 08 25 00 4379-91 P co CCGG 126.350 -999.990 ... R5 1997 12 17 09 43 00 78.9067 11.8883 479.00 474.00 5.00 166685 ZEP 1997 11 13 08 25 00 4380-91 P co CCGG 126.060 -999.990 ... R5 1997 12 17 09 57 00 78.9067 11.8883 479.00 474.00 5.00 166686 ZEP 1997 11 21 07 43 00 813-91 P co CCGG 146.910 -999.990 ... R5 1998 01 20 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166687 ZEP 1997 11 21 07 43 00 814-91 P co CCGG 147.400 -999.990 ... R5 1998 01 20 11 37 00 78.9067 11.8883 479.00 474.00 5.00 166688 ZEP 1997 11 27 12 31 00 733-91 P co CCGG 139.510 -999.990 ... R5 1998 01 20 11 50 00 78.9067 11.8883 479.00 474.00 5.00 166689 ZEP 1997 11 27 12 31 00 734-91 P co CCGG 139.630 -999.990 ... R5 1998 01 20 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166690 ZEP 1997 12 05 09 23 00 811-91 P co CCGG 138.430 -999.990 ... R5 1998 02 11 12 13 00 78.9067 11.8883 479.00 474.00 5.00 166691 ZEP 1997 12 05 09 23 00 812-91 P co CCGG 137.520 -999.990 ... R5 1998 02 11 12 27 00 78.9067 11.8883 479.00 474.00 5.00 166692 ZEP 1997 12 12 12 58 00 739-91 P co CCGG 160.830 -999.990 ... R5 1998 02 11 10 51 00 78.9067 11.8883 479.00 474.00 5.00 166693 ZEP 1997 12 12 12 58 00 740-91 P co CCGG 160.060 -999.990 ... R5 1998 02 11 11 05 00 78.9067 11.8883 479.00 474.00 5.00 166694 ZEP 1997 12 18 09 52 00 457-91 P co CCGG 147.190 -999.990 ... R5 1998 01 26 16 15 00 78.9067 11.8883 479.00 474.00 5.00 166695 ZEP 1997 12 18 09 52 00 458-91 P co CCGG 146.820 -999.990 ... R5 1998 01 26 16 29 00 78.9067 11.8883 479.00 474.00 5.00 166696 ZEP 1997 12 25 09 32 00 4289-91 P co CCGG 408.370 -999.990 P.C R5 1998 01 27 10 22 00 78.9067 11.8883 479.00 474.00 5.00 166697 ZEP 1997 12 25 09 32 00 4290-91 P co CCGG 158.650 -999.990 P.. R5 1998 01 27 10 36 00 78.9067 11.8883 479.00 474.00 5.00 166698 ZEP 1998 01 01 10 13 00 617-91 P co CCGG 151.830 -999.990 ... R5 1998 02 16 10 20 00 78.9067 11.8883 479.00 474.00 5.00 166699 ZEP 1998 01 01 10 13 00 618-91 P co CCGG 151.490 -999.990 ... R5 1998 02 16 10 34 00 78.9067 11.8883 479.00 474.00 5.00 166700 ZEP 1998 01 08 06 55 00 271-91 P co CCGG 193.080 -999.990 ... R5 1998 02 13 16 18 00 78.9067 11.8883 479.00 474.00 5.00 166701 ZEP 1998 01 08 06 55 00 272-91 P co CCGG 191.160 -999.990 ... R5 1998 02 13 16 32 00 78.9067 11.8883 479.00 474.00 5.00 166702 ZEP 1998 01 16 08 55 00 4685-91 P co CCGG 194.840 -999.990 ... R5 1998 02 27 16 13 00 78.9067 11.8883 479.00 474.00 5.00 166703 ZEP 1998 01 16 08 55 00 4686-91 P co CCGG 196.090 -999.990 ... R5 1998 02 27 16 27 00 78.9067 11.8883 479.00 474.00 5.00 166704 ZEP 1998 01 29 08 45 00 4683-91 P co CCGG 198.040 -999.990 ... R5 1998 02 27 14 49 00 78.9067 11.8883 479.00 474.00 5.00 166705 ZEP 1998 01 29 08 45 00 4684-91 P co CCGG 198.860 -999.990 ... R5 1998 02 27 15 03 00 78.9067 11.8883 479.00 474.00 5.00 166706 ZEP 1998 02 20 08 50 00 155-91 P co CCGG 173.660 -999.990 ... R5 1998 03 25 11 55 00 78.9067 11.8883 479.00 474.00 5.00 166707 ZEP 1998 02 20 08 50 00 156-91 P co CCGG 174.290 -999.990 ... R5 1998 03 25 12 09 00 78.9067 11.8883 479.00 474.00 5.00 166708 ZEP 1998 02 26 09 45 00 1355-91 P co CCGG 193.430 -999.990 P.. R5 1998 03 25 11 28 00 78.9067 11.8883 479.00 474.00 5.00 166709 ZEP 1998 02 26 09 45 00 1356-91 P co CCGG 196.940 -999.990 P.. R5 1998 03 25 11 42 00 78.9067 11.8883 479.00 474.00 5.00 166710 ZEP 1998 03 05 09 34 00 487-91 P co CCGG 206.020 -999.990 ... R5 1998 04 14 11 18 00 78.9067 11.8883 479.00 474.00 5.00 166711 ZEP 1998 03 05 09 34 00 488-91 P co CCGG 206.510 -999.990 ... R5 1998 04 14 11 32 00 78.9067 11.8883 479.00 474.00 5.00 166712 ZEP 1998 03 12 09 05 00 1683-91 P co CCGG 177.680 -999.990 ... R5 1998 04 14 14 33 00 78.9067 11.8883 479.00 474.00 5.00 166713 ZEP 1998 03 12 09 05 00 1684-91 P co CCGG 178.840 -999.990 ... R5 1998 04 14 14 47 00 78.9067 11.8883 479.00 474.00 5.00 166714 ZEP 1998 03 20 07 55 00 4611-91 P co CCGG 187.780 -999.990 ... R5 1998 04 22 10 03 00 78.9067 11.8883 479.00 474.00 5.00 166715 ZEP 1998 03 20 07 55 00 4612-91 P co CCGG 186.820 -999.990 ... R5 1998 04 22 10 16 00 78.9067 11.8883 479.00 474.00 5.00 166716 ZEP 1998 04 03 08 35 00 4161-91 P co CCGG 174.350 -999.990 ... R5 1998 05 19 15 09 00 78.9067 11.8883 479.00 474.00 5.00 166717 ZEP 1998 04 03 08 35 00 4162-91 P co CCGG 174.410 -999.990 ... R5 1998 05 19 15 23 00 78.9067 11.8883 479.00 474.00 5.00 166718 ZEP 1998 04 09 08 07 00 1079-91 P co CCGG 173.290 -999.990 ... R5 1998 05 19 14 42 00 78.9067 11.8883 479.00 474.00 5.00 166719 ZEP 1998 04 09 08 07 00 1080-91 P co CCGG 174.570 -999.990 ... R5 1998 05 19 14 56 00 78.9067 11.8883 479.00 474.00 5.00 166720 ZEP 1998 04 16 09 12 00 1389-91 P co CCGG 179.450 -999.990 ... R5 1998 06 23 12 30 00 78.9067 11.8883 479.00 474.00 5.00 166721 ZEP 1998 04 16 09 12 00 1390-91 P co CCGG 177.170 -999.990 ... R5 1998 06 23 12 44 00 78.9067 11.8883 479.00 474.00 5.00 166722 ZEP 1998 04 24 06 40 00 759-91 P co CCGG 181.120 -999.990 ... R5 1998 06 23 12 59 00 78.9067 11.8883 479.00 474.00 5.00 166723 ZEP 1998 04 24 06 40 00 760-91 P co CCGG 179.890 -999.990 ... R5 1998 06 23 13 12 00 78.9067 11.8883 479.00 474.00 5.00 166724 ZEP 1998 05 01 07 46 00 131-91 P co CCGG 174.510 -999.990 ... R5 1998 06 11 12 34 00 78.9067 11.8883 479.00 474.00 5.00 166725 ZEP 1998 05 01 07 46 00 132-91 P co CCGG 174.460 -999.990 ... R5 1998 06 11 12 48 00 78.9067 11.8883 479.00 474.00 5.00 166726 ZEP 1998 05 07 08 44 00 4281-91 P co CCGG 167.040 -999.990 ... R5 1998 06 11 13 01 00 78.9067 11.8883 479.00 474.00 5.00 166727 ZEP 1998 05 07 08 44 00 4282-91 P co CCGG 167.570 -999.990 ... R5 1998 06 11 13 15 00 78.9067 11.8883 479.00 474.00 5.00 166728 ZEP 1998 05 14 06 38 00 1021-91 P co CCGG 160.020 -999.990 ... R5 1998 07 09 10 25 00 78.9067 11.8883 479.00 474.00 5.00 166729 ZEP 1998 05 14 06 38 00 1022-91 P co CCGG 160.030 -999.990 ... R5 1998 07 09 10 39 00 78.9067 11.8883 479.00 474.00 5.00 166730 ZEP 1998 05 21 07 30 00 4025-91 P co CCGG 156.730 -999.990 ... R5 1998 07 09 10 52 00 78.9067 11.8883 479.00 474.00 5.00 166731 ZEP 1998 05 21 07 30 00 4026-91 P co CCGG 156.150 -999.990 ... R5 1998 07 09 11 06 00 78.9067 11.8883 479.00 474.00 5.00 166732 ZEP 1998 05 28 08 25 00 815-91 P co CCGG 147.590 -999.990 ... R5 1998 07 02 13 39 00 78.9067 11.8883 479.00 474.00 5.00 166733 ZEP 1998 05 28 08 25 00 816-91 P co CCGG 147.970 -999.990 ... R5 1998 07 02 13 53 00 78.9067 11.8883 479.00 474.00 5.00 166734 ZEP 1998 06 04 07 40 00 737-91 P co CCGG 134.760 -999.990 ... R5 1998 07 02 14 06 00 78.9067 11.8883 479.00 474.00 5.00 166735 ZEP 1998 06 04 07 40 00 738-91 P co CCGG 135.060 -999.990 ... R5 1998 07 02 14 20 00 78.9067 11.8883 479.00 474.00 5.00 166736 ZEP 1998 06 26 07 33 00 6283-66 P co CCGG 109.500 -999.990 ... R5 1998 08 07 15 23 00 78.9067 11.8883 479.00 474.00 5.00 166737 ZEP 1998 06 26 07 33 00 6284-66 P co CCGG 108.220 -999.990 ... R5 1998 08 07 15 37 00 78.9067 11.8883 479.00 474.00 5.00 166738 ZEP 1998 07 03 09 30 00 6663-66 P co CCGG 106.280 -999.990 ... R5 1998 08 07 15 51 00 78.9067 11.8883 479.00 474.00 5.00 166739 ZEP 1998 07 03 09 30 00 6664-66 P co CCGG 106.250 -999.990 ... R5 1998 08 07 16 04 00 78.9067 11.8883 479.00 474.00 5.00 166740 ZEP 1998 07 10 07 50 00 1921-91 P co CCGG 113.350 -999.990 ... R5 1998 08 19 14 37 00 78.9067 11.8883 479.00 474.00 5.00 166741 ZEP 1998 07 10 07 50 00 1922-91 P co CCGG 111.500 -999.990 ... R5 1998 08 19 14 50 00 78.9067 11.8883 479.00 474.00 5.00 166742 ZEP 1998 07 17 09 35 00 1923-91 P co CCGG 97.700 -999.990 ... R5 1998 08 19 15 04 00 78.9067 11.8883 479.00 474.00 5.00 166743 ZEP 1998 07 17 09 35 00 1924-91 P co CCGG 98.230 -999.990 ... R5 1998 08 19 15 18 00 78.9067 11.8883 479.00 474.00 5.00 166744 ZEP 1998 07 24 08 05 00 1582-91 P co CCGG 106.530 -999.990 ... R5 1998 09 22 16 43 00 78.9067 11.8883 479.00 474.00 5.00 166745 ZEP 1998 07 30 08 30 00 4615-91 P co CCGG 110.140 -999.990 ... R5 1998 09 22 13 56 00 78.9067 11.8883 479.00 474.00 5.00 166746 ZEP 1998 07 30 08 30 00 4616-91 P co CCGG 109.660 -999.990 ... R5 1998 09 22 14 09 00 78.9067 11.8883 479.00 474.00 5.00 166747 ZEP 1998 08 07 08 30 00 105-91 P co CCGG 97.370 -999.990 ... R5 1998 09 25 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166748 ZEP 1998 08 07 08 30 00 106-91 P co CCGG 96.730 -999.990 ... R5 1998 09 25 12 17 00 78.9067 11.8883 479.00 474.00 5.00 166749 ZEP 1998 08 13 08 08 00 1613-91 P co CCGG 101.960 -999.990 ... R5 1998 09 28 10 11 00 78.9067 11.8883 479.00 474.00 5.00 166750 ZEP 1998 08 13 08 08 00 1614-91 P co CCGG 101.630 -999.990 ... R5 1998 09 28 10 24 00 78.9067 11.8883 479.00 474.00 5.00 166751 ZEP 1998 08 22 14 30 00 161-91 P co CCGG 106.170 -999.990 .X. R5 1998 09 23 13 36 00 78.9067 11.8883 479.00 474.00 5.00 166752 ZEP 1998 08 22 14 30 00 162-91 P co CCGG 105.330 -999.990 .X. R5 1998 09 23 13 50 00 78.9067 11.8883 479.00 474.00 5.00 166753 ZEP 1998 08 23 10 25 00 1929-91 P co CCGG 105.960 -999.990 .X. R5 1998 09 23 14 04 00 78.9067 11.8883 479.00 474.00 5.00 166754 ZEP 1998 08 23 10 25 00 1930-91 P co CCGG 104.790 -999.990 .X. R5 1998 09 23 14 17 00 78.9067 11.8883 479.00 474.00 5.00 166755 ZEP 1998 08 27 08 13 00 1589-91 P co CCGG 129.400 -999.990 ... R5 1998 10 14 13 24 00 78.9067 11.8883 479.00 474.00 5.00 166756 ZEP 1998 08 27 08 13 00 1590-91 P co CCGG 128.670 -999.990 ... R5 1998 10 14 13 38 00 78.9067 11.8883 479.00 474.00 5.00 166757 ZEP 1998 09 03 08 02 00 4695-91 P co CCGG 144.370 -999.990 ... R5 1998 10 14 12 57 00 78.9067 11.8883 479.00 474.00 5.00 166758 ZEP 1998 09 03 08 02 00 4696-91 P co CCGG 144.550 -999.990 ... R5 1998 10 14 13 11 00 78.9067 11.8883 479.00 474.00 5.00 166759 ZEP 1998 09 24 08 12 00 36-98 P co CCGG 166.840 -999.990 ... R5 1998 11 17 12 37 00 78.9067 11.8883 479.00 474.00 5.00 166760 ZEP 1998 09 24 08 12 00 37-98 P co CCGG 167.150 -999.990 ... R5 1998 11 17 12 51 00 78.9067 11.8883 479.00 474.00 5.00 166761 ZEP 1998 10 02 11 23 00 4657-91 P co CCGG 171.470 -999.990 ... R5 1998 11 12 16 17 00 78.9067 11.8883 479.00 474.00 5.00 166762 ZEP 1998 10 02 11 23 00 4658-91 P co CCGG 170.170 -999.990 ... R5 1998 11 12 16 31 00 78.9067 11.8883 479.00 474.00 5.00 166763 ZEP 1998 10 08 08 18 00 255-91 P co CCGG 180.500 -999.990 ... R5 1998 11 12 14 55 00 78.9067 11.8883 479.00 474.00 5.00 166764 ZEP 1998 10 08 08 18 00 256-91 P co CCGG 179.700 -999.990 ... R5 1998 11 12 15 09 00 78.9067 11.8883 479.00 474.00 5.00 166765 ZEP 1998 10 16 08 45 00 6183-66 P co CCGG 189.650 -999.990 ... R5 1998 12 01 10 55 00 78.9067 11.8883 479.00 474.00 5.00 166766 ZEP 1998 10 16 08 45 00 6184-66 P co CCGG 189.850 -999.990 ... R5 1998 12 01 11 09 00 78.9067 11.8883 479.00 474.00 5.00 166767 ZEP 1998 10 22 09 30 00 6043-66 P co CCGG 204.400 -999.990 .X. R5 1998 12 01 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166768 ZEP 1998 10 22 09 30 00 6044-66 P co CCGG 203.480 -999.990 .X. R5 1998 12 01 11 36 00 78.9067 11.8883 479.00 474.00 5.00 166769 ZEP 1998 10 30 10 07 00 793-91 P co CCGG 187.030 -999.990 ... R5 1998 12 04 11 58 00 78.9067 11.8883 479.00 474.00 5.00 166770 ZEP 1998 10 30 10 07 00 794-91 P co CCGG 186.500 -999.990 ... R5 1998 12 04 12 11 00 78.9067 11.8883 479.00 474.00 5.00 166771 ZEP 1998 11 05 08 45 00 800-91 P co CCGG 185.770 -999.990 ... R5 1998 12 04 15 03 00 78.9067 11.8883 479.00 474.00 5.00 166772 ZEP 1998 11 20 09 15 00 835-91 P co CCGG 181.860 -999.990 ... R5 1999 01 05 10 53 00 78.9067 11.8883 479.00 474.00 5.00 166773 ZEP 1998 11 20 09 15 00 836-91 P co CCGG 182.700 -999.990 ... R5 1999 01 05 11 07 00 78.9067 11.8883 479.00 474.00 5.00 166774 ZEP 1998 11 26 08 45 00 1359-91 P co CCGG 163.290 -999.990 ... R5 1999 01 05 09 29 00 78.9067 11.8883 479.00 474.00 5.00 166775 ZEP 1998 11 26 08 45 00 1360-91 P co CCGG 162.490 -999.990 ... R5 1999 01 05 09 43 00 78.9067 11.8883 479.00 474.00 5.00 166776 ZEP 1998 12 04 10 15 00 4593-91 P co CCGG 168.610 -999.990 ... R5 1999 01 15 14 51 00 78.9067 11.8883 479.00 474.00 5.00 166777 ZEP 1998 12 04 10 15 00 4594-91 P co CCGG 169.130 -999.990 ... R5 1999 01 15 15 05 00 78.9067 11.8883 479.00 474.00 5.00 166778 ZEP 1998 12 11 09 05 00 1589-91 P co CCGG 194.000 -999.990 P.. R5 1999 01 15 15 19 00 78.9067 11.8883 479.00 474.00 5.00 166779 ZEP 1998 12 11 09 05 00 1590-91 P co CCGG 225.220 -999.990 P.. R5 1999 01 15 15 32 00 78.9067 11.8883 479.00 474.00 5.00 166780 ZEP 1998 12 18 09 50 00 79-91 P co CCGG 178.280 -999.990 ... R5 1999 02 16 09 45 00 78.9067 11.8883 479.00 474.00 5.00 166781 ZEP 1998 12 18 09 50 00 80-91 P co CCGG 178.940 -999.990 ... R5 1999 02 16 09 59 00 78.9067 11.8883 479.00 474.00 5.00 166782 ZEP 1998 12 31 08 47 00 1807-91 P co CCGG 188.230 -999.990 ... R5 1999 02 16 10 13 00 78.9067 11.8883 479.00 474.00 5.00 166783 ZEP 1998 12 31 08 47 00 1808-91 P co CCGG 188.860 -999.990 ... R5 1999 02 16 10 26 00 78.9067 11.8883 479.00 474.00 5.00 166784 ZEP 1999 01 07 13 20 00 653-91 P co CCGG 182.150 -999.990 ... R5 1999 02 12 14 53 00 78.9067 11.8883 479.00 474.00 5.00 166785 ZEP 1999 01 07 13 20 00 654-91 P co CCGG 182.940 -999.990 ... R5 1999 02 12 15 07 00 78.9067 11.8883 479.00 474.00 5.00 166786 ZEP 1999 01 09 15 00 00 97-91 P co CCGG 182.930 -999.990 ... R5 1999 02 16 09 18 00 78.9067 11.8883 479.00 474.00 5.00 166787 ZEP 1999 01 09 15 00 00 98-91 P co CCGG 183.410 -999.990 ... R5 1999 02 16 09 32 00 78.9067 11.8883 479.00 474.00 5.00 166788 ZEP 1999 01 14 09 00 00 1290-91 P co CCGG 161.990 -999.990 ... R5 1999 02 19 12 14 00 78.9067 11.8883 479.00 474.00 5.00 166790 ZEP 1999 01 14 09 00 00 469-91 P co CCGG 162.290 -999.990 ... R5 1999 02 19 12 28 00 78.9067 11.8883 479.00 474.00 5.00 166789 ZEP 1999 01 21 09 16 00 1289-91 P co CCGG 185.280 -999.990 ... R5 1999 02 19 13 51 00 78.9067 11.8883 479.00 474.00 5.00 166792 ZEP 1999 01 21 09 16 00 470-91 P co CCGG 186.990 -999.990 ... R5 1999 02 19 13 38 00 78.9067 11.8883 479.00 474.00 5.00 166791 ZEP 1999 01 29 09 08 00 1007-91 P co CCGG 185.050 -999.990 P.. R5 1999 03 25 10 02 00 78.9067 11.8883 479.00 474.00 5.00 166793 ZEP 1999 01 29 09 08 00 1008-91 P co CCGG 195.640 -999.990 P.. R5 1999 03 25 10 16 00 78.9067 11.8883 479.00 474.00 5.00 166794 ZEP 1999 02 06 09 00 00 1131-91 P co CCGG 172.180 -999.990 ... R5 1999 03 24 09 27 00 78.9067 11.8883 479.00 474.00 5.00 166795 ZEP 1999 02 06 09 00 00 1132-91 P co CCGG 171.200 -999.990 ... R5 1999 03 24 09 40 00 78.9067 11.8883 479.00 474.00 5.00 166796 ZEP 1999 02 11 09 00 00 4755-91 P co CCGG 201.640 -999.990 .X. R5 1999 03 30 15 01 00 78.9067 11.8883 479.00 474.00 5.00 166797 ZEP 1999 02 11 09 00 00 4756-91 P co CCGG 201.640 -999.990 .X. R5 1999 03 30 15 14 00 78.9067 11.8883 479.00 474.00 5.00 166798 ZEP 1999 02 18 09 05 00 1085-91 P co CCGG 187.610 -999.990 ... R5 1999 03 30 15 28 00 78.9067 11.8883 479.00 474.00 5.00 166799 ZEP 1999 02 18 09 05 00 1086-91 P co CCGG 188.100 -999.990 ... R5 1999 03 30 15 42 00 78.9067 11.8883 479.00 474.00 5.00 166800 ZEP 1999 02 25 08 55 00 655-91 P co CCGG 184.900 -999.990 ... R5 1999 04 23 14 01 00 78.9067 11.8883 479.00 474.00 5.00 166801 ZEP 1999 02 25 08 55 00 656-91 P co CCGG 182.700 -999.990 ... R5 1999 04 23 14 15 00 78.9067 11.8883 479.00 474.00 5.00 166802 ZEP 1999 03 04 09 18 00 357-91 P co CCGG 188.120 -999.990 P.. R5 1999 04 23 13 34 00 78.9067 11.8883 479.00 474.00 5.00 166803 ZEP 1999 03 04 09 18 00 358-91 P co CCGG 194.210 -999.990 P.. R5 1999 04 23 13 48 00 78.9067 11.8883 479.00 474.00 5.00 166804 ZEP 1999 03 11 08 55 00 302-91 P co CCGG 215.820 -999.990 .X. R5 1999 04 28 15 05 00 78.9067 11.8883 479.00 474.00 5.00 166805 ZEP 1999 03 25 09 00 00 2079-91 P co CCGG 177.780 -999.990 P.. R5 1999 04 28 15 19 00 78.9067 11.8883 479.00 474.00 5.00 166806 ZEP 1999 03 25 09 00 00 2080-91 P co CCGG 185.750 -999.990 P.. R5 1999 04 28 15 33 00 78.9067 11.8883 479.00 474.00 5.00 166807 ZEP 1999 04 02 08 05 00 1981-91 P co CCGG 181.700 -999.990 ... R5 1999 06 29 11 25 00 78.9067 11.8883 479.00 474.00 5.00 166808 ZEP 1999 04 02 08 05 00 1982-91 P co CCGG 178.760 -999.990 ... R5 1999 06 29 11 38 00 78.9067 11.8883 479.00 474.00 5.00 166809 ZEP 1999 04 09 08 10 00 1309-91 P co CCGG 198.510 -999.990 ... R5 1999 06 29 12 19 00 78.9067 11.8883 479.00 474.00 5.00 166810 ZEP 1999 04 09 08 10 00 1310-91 P co CCGG 199.400 -999.990 ... R5 1999 06 29 12 33 00 78.9067 11.8883 479.00 474.00 5.00 166811 ZEP 1999 04 15 08 35 00 1939-91 P co CCGG 194.190 -999.990 ... R5 1999 06 10 13 35 00 78.9067 11.8883 479.00 474.00 5.00 166812 ZEP 1999 04 15 08 35 00 1940-91 P co CCGG 196.050 -999.990 ... R5 1999 06 10 13 49 00 78.9067 11.8883 479.00 474.00 5.00 166813 ZEP 1999 04 22 08 45 00 1125-91 P co CCGG 175.060 -999.990 ... R5 1999 06 10 14 02 00 78.9067 11.8883 479.00 474.00 5.00 166814 ZEP 1999 04 22 08 45 00 1126-91 P co CCGG 175.810 -999.990 ... R5 1999 06 10 14 16 00 78.9067 11.8883 479.00 474.00 5.00 166815 ZEP 1999 05 01 08 53 00 4339-91 P co CCGG 173.970 -999.990 ... R5 1999 07 23 12 22 00 78.9067 11.8883 479.00 474.00 5.00 166816 ZEP 1999 05 01 08 53 00 4340-91 P co CCGG 173.440 -999.990 ... R5 1999 07 23 12 35 00 78.9067 11.8883 479.00 474.00 5.00 166817 ZEP 1999 05 06 08 32 00 287-91 P co CCGG 168.800 -999.990 ... R5 1999 07 23 11 54 00 78.9067 11.8883 479.00 474.00 5.00 166818 ZEP 1999 05 06 08 32 00 288-91 P co CCGG 170.530 -999.990 ... R5 1999 07 23 12 08 00 78.9067 11.8883 479.00 474.00 5.00 166819 ZEP 1999 05 14 09 00 00 4689-91 P co CCGG 188.770 -999.990 P.. R5 1999 08 11 12 48 00 78.9067 11.8883 479.00 474.00 5.00 166820 ZEP 1999 05 14 09 00 00 4690-91 P co CCGG 166.190 -999.990 P.. R5 1999 08 11 13 02 00 78.9067 11.8883 479.00 474.00 5.00 166821 ZEP 1999 05 21 08 58 00 563-91 P co CCGG 149.920 -999.990 ... R5 1999 08 11 13 43 00 78.9067 11.8883 479.00 474.00 5.00 166822 ZEP 1999 05 21 08 58 00 564-91 P co CCGG 149.120 -999.990 ... R5 1999 08 11 13 57 00 78.9067 11.8883 479.00 474.00 5.00 166823 ZEP 1999 05 27 08 50 00 4537-91 P co CCGG 200.360 -999.990 P.. R5 1999 08 12 09 32 00 78.9067 11.8883 479.00 474.00 5.00 166824 ZEP 1999 05 27 08 50 00 4538-91 P co CCGG 142.290 -999.990 P.. R5 1999 08 12 09 45 00 78.9067 11.8883 479.00 474.00 5.00 166825 ZEP 1999 06 07 08 40 00 1557-91 P co CCGG 133.190 -999.990 P.. R5 1999 08 12 12 18 00 78.9067 11.8883 479.00 474.00 5.00 166826 ZEP 1999 06 07 08 40 00 1558-91 P co CCGG 157.280 -999.990 P.. R5 1999 08 12 12 31 00 78.9067 11.8883 479.00 474.00 5.00 166827 ZEP 1999 06 11 09 30 00 427-91 P co CCGG 115.980 -999.990 P.. R5 1999 08 12 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166828 ZEP 1999 06 11 09 30 00 428-91 P co CCGG 135.940 -999.990 P.. R5 1999 08 12 11 36 00 78.9067 11.8883 479.00 474.00 5.00 166829 ZEP 1999 06 17 08 30 00 4345-91 P co CCGG 115.260 -999.990 P.. R5 1999 08 12 11 50 00 78.9067 11.8883 479.00 474.00 5.00 166830 ZEP 1999 06 17 08 30 00 4346-91 P co CCGG 230.990 -999.990 P.C R5 1999 08 12 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166831 ZEP 1999 07 15 09 45 00 2041-91 P co CCGG 353.290 -999.990 P.C R5 1999 09 07 15 19 00 78.9067 11.8883 479.00 474.00 5.00 166832 ZEP 1999 07 15 09 45 00 2042-91 P co CCGG 104.610 -999.990 P.. R5 1999 09 07 15 33 00 78.9067 11.8883 479.00 474.00 5.00 166833 ZEP 1999 07 22 09 15 00 2045-91 P co CCGG 88.030 -999.990 ... R5 1999 09 07 14 52 00 78.9067 11.8883 479.00 474.00 5.00 166834 ZEP 1999 07 22 09 15 00 2046-91 P co CCGG 87.630 -999.990 ... R5 1999 09 07 15 06 00 78.9067 11.8883 479.00 474.00 5.00 166835 ZEP 1999 07 26 09 30 00 789-91 P co CCGG 88.310 -999.990 P.. R5 1999 09 07 13 55 00 78.9067 11.8883 479.00 474.00 5.00 166836 ZEP 1999 07 26 09 30 00 790-91 P co CCGG 117.350 -999.990 P.. R5 1999 09 07 14 09 00 78.9067 11.8883 479.00 474.00 5.00 166837 ZEP 1999 07 29 09 00 00 1851-91 P co CCGG 88.560 -999.990 P.. R5 1999 09 01 15 13 00 78.9067 11.8883 479.00 474.00 5.00 166838 ZEP 1999 07 29 09 00 00 1852-91 P co CCGG 85.220 -999.990 P.. R5 1999 09 01 15 26 00 78.9067 11.8883 479.00 474.00 5.00 166839 ZEP 1999 08 02 08 55 00 785-91 P co CCGG 85.580 -999.990 ... R5 1999 09 07 12 33 00 78.9067 11.8883 479.00 474.00 5.00 166840 ZEP 1999 08 02 08 55 00 786-91 P co CCGG 87.250 -999.990 ... R5 1999 09 07 12 47 00 78.9067 11.8883 479.00 474.00 5.00 166841 ZEP 1999 08 05 12 34 56 1695-91 P co CCGG 83.620 -999.990 ... R5 1999 09 01 14 45 00 78.9067 11.8883 479.00 474.00 5.00 166842 ZEP 1999 08 05 12 34 56 1696-91 P co CCGG 82.600 -999.990 ... R5 1999 09 01 14 59 00 78.9067 11.8883 479.00 474.00 5.00 166843 ZEP 1999 08 09 13 40 00 795-91 P co CCGG 81.280 -999.990 ... R5 1999 10 22 12 34 00 78.9067 11.8883 479.00 474.00 5.00 166844 ZEP 1999 08 09 13 40 00 796-91 P co CCGG 82.200 -999.990 ... R5 1999 10 22 12 48 00 78.9067 11.8883 479.00 474.00 5.00 166845 ZEP 1999 08 12 09 00 00 1267-91 P co CCGG 88.020 -999.990 ... R5 1999 10 21 12 41 00 78.9067 11.8883 479.00 474.00 5.00 166846 ZEP 1999 08 12 09 00 00 1268-91 P co CCGG 86.410 -999.990 ... R5 1999 10 21 12 55 00 78.9067 11.8883 479.00 474.00 5.00 166847 ZEP 1999 08 20 08 55 00 809-91 P co CCGG 95.770 -999.990 ... R5 1999 10 22 12 07 00 78.9067 11.8883 479.00 474.00 5.00 166848 ZEP 1999 08 20 08 55 00 810-91 P co CCGG 95.370 -999.990 ... R5 1999 10 22 12 20 00 78.9067 11.8883 479.00 474.00 5.00 166849 ZEP 1999 08 23 13 18 00 739-91 P co CCGG 92.510 -999.990 ... R5 1999 11 03 14 49 00 78.9067 11.8883 479.00 474.00 5.00 166850 ZEP 1999 08 23 13 18 00 740-91 P co CCGG 93.690 -999.990 ... R5 1999 11 03 15 03 00 78.9067 11.8883 479.00 474.00 5.00 166851 ZEP 1999 08 26 06 50 00 679-91 P co CCGG 89.430 -999.990 P.. R5 1999 10 21 12 14 00 78.9067 11.8883 479.00 474.00 5.00 166852 ZEP 1999 08 26 06 50 00 680-91 P co CCGG 86.260 -999.990 P.. R5 1999 10 21 12 28 00 78.9067 11.8883 479.00 474.00 5.00 166853 ZEP 1999 08 30 08 10 00 811-91 P co CCGG 94.380 -999.990 ... R5 1999 11 03 15 17 00 78.9067 11.8883 479.00 474.00 5.00 166854 ZEP 1999 08 30 08 10 00 812-91 P co CCGG 93.980 -999.990 ... R5 1999 11 03 15 30 00 78.9067 11.8883 479.00 474.00 5.00 166855 ZEP 1999 09 02 08 30 00 4053-91 P co CCGG 152.440 -999.990 P.. R5 1999 10 21 10 49 00 78.9067 11.8883 479.00 474.00 5.00 166856 ZEP 1999 09 02 08 30 00 4054-91 P co CCGG 248.990 -999.990 P.C R5 1999 10 21 11 02 00 78.9067 11.8883 479.00 474.00 5.00 166857 ZEP 1999 09 06 08 15 00 791-91 P co CCGG 96.430 -999.990 ... R5 1999 10 22 11 35 00 78.9067 11.8883 479.00 474.00 5.00 166858 ZEP 1999 09 06 08 15 00 792-91 P co CCGG 96.170 -999.990 ... R5 1999 10 22 11 49 00 78.9067 11.8883 479.00 474.00 5.00 166859 ZEP 1999 09 09 09 00 00 157-98 P co CCGG 96.230 -999.990 P.. R5 1999 10 21 11 43 00 78.9067 11.8883 479.00 474.00 5.00 166860 ZEP 1999 09 09 09 00 00 158-98 P co CCGG 99.700 -999.990 P.. R5 1999 10 21 11 57 00 78.9067 11.8883 479.00 474.00 5.00 166861 ZEP 1999 09 13 07 15 00 747-91 P co CCGG 94.360 -999.990 ... R5 1999 10 22 13 01 00 78.9067 11.8883 479.00 474.00 5.00 166862 ZEP 1999 09 13 07 15 00 748-91 P co CCGG 95.690 -999.990 ... R5 1999 10 22 13 15 00 78.9067 11.8883 479.00 474.00 5.00 166863 ZEP 1999 09 16 08 47 00 1419-91 P co CCGG 99.270 -999.990 P.. R5 1999 11 30 14 26 00 78.9067 11.8883 479.00 474.00 5.00 166864 ZEP 1999 09 16 08 47 00 1420-91 P co CCGG 125.340 -999.990 P.. R5 1999 11 30 14 40 00 78.9067 11.8883 479.00 474.00 5.00 166865 ZEP 1999 09 20 09 00 00 4443-91 P co CCGG 138.600 -999.990 P.. R5 1999 12 01 11 48 00 78.9067 11.8883 479.00 474.00 5.00 166866 ZEP 1999 09 20 09 00 00 4444-91 P co CCGG 100.410 -999.990 P.. R5 1999 12 01 12 02 00 78.9067 11.8883 479.00 474.00 5.00 166867 ZEP 1999 09 23 11 20 00 4681-91 P co CCGG 96.920 -999.990 ... R5 1999 11 30 13 57 00 78.9067 11.8883 479.00 474.00 5.00 166868 ZEP 1999 09 23 11 20 00 4682-91 P co CCGG 94.400 -999.990 ... R5 1999 11 30 14 11 00 78.9067 11.8883 479.00 474.00 5.00 166869 ZEP 1999 09 27 08 45 00 693-91 P co CCGG 102.670 -999.990 ... R5 1999 12 01 13 10 00 78.9067 11.8883 479.00 474.00 5.00 166870 ZEP 1999 09 27 08 45 00 694-91 P co CCGG 100.460 -999.990 ... R5 1999 12 01 13 24 00 78.9067 11.8883 479.00 474.00 5.00 166871 ZEP 1999 09 30 09 03 00 4201-91 P co CCGG 97.520 -999.990 ... R5 1999 12 01 12 16 00 78.9067 11.8883 479.00 474.00 5.00 166872 ZEP 1999 09 30 09 03 00 4202-91 P co CCGG 99.190 -999.990 ... R5 1999 12 01 12 29 00 78.9067 11.8883 479.00 474.00 5.00 166873 ZEP 1999 10 04 09 20 00 813-91 P co CCGG 96.780 -999.990 ... R5 1999 11 18 11 44 00 78.9067 11.8883 479.00 474.00 5.00 166874 ZEP 1999 10 04 09 20 00 814-91 P co CCGG 95.860 -999.990 ... R5 1999 11 18 11 57 00 78.9067 11.8883 479.00 474.00 5.00 166875 ZEP 1999 10 07 08 45 00 1611-91 P co CCGG 100.810 -999.990 ... R5 1999 12 01 12 43 00 78.9067 11.8883 479.00 474.00 5.00 166876 ZEP 1999 10 07 08 45 00 1612-91 P co CCGG 103.510 -999.990 ... R5 1999 12 01 12 57 00 78.9067 11.8883 479.00 474.00 5.00 166877 ZEP 1999 10 11 09 00 00 733-91 P co CCGG 121.890 -999.990 P.. R5 1999 11 15 14 39 00 78.9067 11.8883 479.00 474.00 5.00 166878 ZEP 1999 10 11 09 00 00 734-91 P co CCGG 109.700 -999.990 P.. R5 1999 11 15 14 53 00 78.9067 11.8883 479.00 474.00 5.00 166879 ZEP 1999 10 14 09 20 00 535-91 P co CCGG 106.630 -999.990 ... R5 1999 11 23 15 53 00 78.9067 11.8883 479.00 474.00 5.00 166880 ZEP 1999 10 14 09 20 00 536-91 P co CCGG 104.920 -999.990 ... R5 1999 11 23 16 06 00 78.9067 11.8883 479.00 474.00 5.00 166881 ZEP 1999 10 18 08 55 00 11-91 P co CCGG 105.160 -999.990 ... R5 1999 11 30 13 30 00 78.9067 11.8883 479.00 474.00 5.00 166882 ZEP 1999 10 18 08 55 00 12-91 P co CCGG 104.980 -999.990 ... R5 1999 11 30 13 44 00 78.9067 11.8883 479.00 474.00 5.00 166883 ZEP 1999 10 21 08 45 00 1477-91 P co CCGG 106.610 -999.990 P.. R5 1999 11 23 16 20 00 78.9067 11.8883 479.00 474.00 5.00 166884 ZEP 1999 10 21 08 45 00 1478-91 P co CCGG 112.910 -999.990 P.. R5 1999 11 23 16 34 00 78.9067 11.8883 479.00 474.00 5.00 166885 ZEP 1999 10 25 09 15 00 1207-91 P co CCGG 107.230 -999.990 ... R5 1999 11 30 13 03 00 78.9067 11.8883 479.00 474.00 5.00 166886 ZEP 1999 10 25 09 15 00 1208-91 P co CCGG 107.690 -999.990 ... R5 1999 11 30 13 16 00 78.9067 11.8883 479.00 474.00 5.00 166887 ZEP 1999 10 28 08 55 00 1151-91 P co CCGG 108.020 -999.990 ... R5 1999 11 24 10 33 00 78.9067 11.8883 479.00 474.00 5.00 166888 ZEP 1999 10 28 08 55 00 1152-91 P co CCGG 109.000 -999.990 ... R5 1999 11 24 10 47 00 78.9067 11.8883 479.00 474.00 5.00 166889 ZEP 1999 11 04 09 55 00 5-98 P co CCGG 117.650 -999.990 ... R5 1999 11 24 10 04 00 78.9067 11.8883 479.00 474.00 5.00 166890 ZEP 1999 11 04 09 55 00 6-98 P co CCGG 117.510 -999.990 ... R5 1999 11 24 10 18 00 78.9067 11.8883 479.00 474.00 5.00 166891 ZEP 1999 11 08 09 25 00 4149-91 P co CCGG 117.200 -999.990 ... R5 1999 12 27 14 45 00 78.9067 11.8883 479.00 474.00 5.00 166892 ZEP 1999 11 08 09 25 00 4150-91 P co CCGG 118.600 -999.990 ... R5 1999 12 27 14 59 00 78.9067 11.8883 479.00 474.00 5.00 166893 ZEP 1999 11 11 10 28 00 4505-91 P co CCGG 116.340 -999.990 ... R5 1999 12 27 16 36 00 78.9067 11.8883 479.00 474.00 5.00 166894 ZEP 1999 11 11 10 28 00 4506-91 P co CCGG 117.180 -999.990 ... R5 1999 12 27 16 50 00 78.9067 11.8883 479.00 474.00 5.00 166895 ZEP 1999 11 15 09 15 00 805-91 P co CCGG 118.950 -999.990 ... R5 1999 12 22 10 00 00 78.9067 11.8883 479.00 474.00 5.00 166896 ZEP 1999 11 15 09 15 00 806-91 P co CCGG 118.260 -999.990 ... R5 1999 12 22 10 13 00 78.9067 11.8883 479.00 474.00 5.00 166897 ZEP 1999 11 18 09 01 00 1423-91 P co CCGG 120.960 -999.990 ... R5 1999 12 28 09 35 00 78.9067 11.8883 479.00 474.00 5.00 166898 ZEP 1999 11 18 09 01 00 1424-91 P co CCGG 120.850 -999.990 ... R5 1999 12 28 09 49 00 78.9067 11.8883 479.00 474.00 5.00 166899 ZEP 1999 11 25 10 50 00 1963-91 P co CCGG 130.740 -999.990 ... R5 2000 01 21 10 01 00 78.9067 11.8883 479.00 474.00 5.00 166900 ZEP 1999 11 25 10 50 00 1964-91 P co CCGG 130.520 -999.990 ... R5 2000 01 21 10 15 00 78.9067 11.8883 479.00 474.00 5.00 166901 ZEP 1999 11 29 09 30 00 783-91 P co CCGG 145.300 -999.990 ... R5 1999 12 22 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166902 ZEP 1999 11 29 09 30 00 784-91 P co CCGG 146.540 -999.990 ... R5 1999 12 22 11 37 00 78.9067 11.8883 479.00 474.00 5.00 166903 ZEP 1999 12 02 09 20 00 4413-91 P co CCGG 131.290 -999.990 ... R5 2000 01 19 12 50 00 78.9067 11.8883 479.00 474.00 5.00 166904 ZEP 1999 12 02 09 20 00 4414-91 P co CCGG 130.350 -999.990 ... R5 2000 01 19 13 04 00 78.9067 11.8883 479.00 474.00 5.00 166905 ZEP 1999 12 06 09 33 00 735-91 P co CCGG 143.940 -999.990 ... R5 2000 01 28 11 48 00 78.9067 11.8883 479.00 474.00 5.00 166906 ZEP 1999 12 06 09 33 00 736-91 P co CCGG 145.520 -999.990 ... R5 2000 01 28 12 01 00 78.9067 11.8883 479.00 474.00 5.00 166907 ZEP 1999 12 09 09 05 00 1027-91 P co CCGG 143.020 -999.990 ... R5 2000 01 19 12 23 00 78.9067 11.8883 479.00 474.00 5.00 166908 ZEP 1999 12 09 09 05 00 1028-91 P co CCGG 143.020 -999.990 ... R5 2000 01 19 12 36 00 78.9067 11.8883 479.00 474.00 5.00 166909 ZEP 1999 12 13 09 05 00 737-91 P co CCGG 139.580 -999.990 ... R5 2000 01 28 14 06 00 78.9067 11.8883 479.00 474.00 5.00 166910 ZEP 1999 12 13 09 05 00 738-91 P co CCGG 139.590 -999.990 ... R5 2000 01 28 14 20 00 78.9067 11.8883 479.00 474.00 5.00 166911 ZEP 1999 12 16 09 43 00 235-91 P co CCGG 145.070 -999.990 ... R5 2000 01 20 15 20 00 78.9067 11.8883 479.00 474.00 5.00 166912 ZEP 1999 12 16 09 43 00 236-91 P co CCGG 144.080 -999.990 ... R5 2000 01 20 15 34 00 78.9067 11.8883 479.00 474.00 5.00 166913 ZEP 1999 12 20 09 55 00 815-91 P co CCGG 163.690 -999.990 ... R5 2000 01 28 14 33 00 78.9067 11.8883 479.00 474.00 5.00 166914 ZEP 1999 12 20 09 55 00 816-91 P co CCGG 163.690 -999.990 ... R5 2000 01 28 14 47 00 78.9067 11.8883 479.00 474.00 5.00 166915 ZEP 1999 12 23 10 20 00 1195-91 P co CCGG 155.320 -999.990 P.. R5 2000 01 26 11 50 00 78.9067 11.8883 479.00 474.00 5.00 166916 ZEP 1999 12 23 10 20 00 1196-91 P co CCGG 174.160 -999.990 P.. R5 2000 01 26 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166917 ZEP 1999 12 27 10 10 00 787-91 P co CCGG 160.070 -999.990 ... R5 2000 01 28 12 15 00 78.9067 11.8883 479.00 474.00 5.00 166918 ZEP 1999 12 27 10 10 00 788-91 P co CCGG 160.440 -999.990 ... R5 2000 01 28 12 29 00 78.9067 11.8883 479.00 474.00 5.00 166919 ZEP 1999 12 30 09 20 00 4035-91 P co CCGG 161.240 -999.990 ... R5 2000 01 26 11 23 00 78.9067 11.8883 479.00 474.00 5.00 166920 ZEP 1999 12 30 09 20 00 4036-91 P co CCGG 161.810 -999.990 ... R5 2000 01 26 11 37 00 78.9067 11.8883 479.00 474.00 5.00 166921 ZEP 2000 01 03 09 00 00 799-91 P co CCGG 165.060 -999.990 ... R5 2000 02 04 14 55 00 78.9067 11.8883 479.00 474.00 5.00 166922 ZEP 2000 01 03 09 00 00 800-91 P co CCGG 164.490 -999.990 ... R5 2000 02 04 15 08 00 78.9067 11.8883 479.00 474.00 5.00 166923 ZEP 2000 01 06 09 20 00 253-91 P co CCGG 205.780 -999.990 .X. R5 2000 01 31 16 06 00 78.9067 11.8883 479.00 474.00 5.00 166924 ZEP 2000 01 06 09 20 00 254-91 P co CCGG 205.700 -999.990 .X. R5 2000 01 31 16 19 00 78.9067 11.8883 479.00 474.00 5.00 166925 ZEP 2000 01 10 09 20 00 781-91 P co CCGG 158.790 -999.990 ... R5 2000 02 04 14 26 00 78.9067 11.8883 479.00 474.00 5.00 166926 ZEP 2000 01 10 09 20 00 782-91 P co CCGG 159.180 -999.990 ... R5 2000 02 04 14 39 00 78.9067 11.8883 479.00 474.00 5.00 166927 ZEP 2000 01 14 09 47 00 1383-91 P co CCGG 162.530 -999.990 ... R5 2000 01 31 15 09 00 78.9067 11.8883 479.00 474.00 5.00 166928 ZEP 2000 01 14 09 47 00 1384-91 P co CCGG 163.180 -999.990 ... R5 2000 01 31 15 23 00 78.9067 11.8883 479.00 474.00 5.00 166929 ZEP 2000 01 17 10 35 00 745-91 P co CCGG 151.700 -999.990 ... R5 2000 02 16 12 28 00 78.9067 11.8883 479.00 474.00 5.00 166930 ZEP 2000 01 17 10 35 00 746-91 P co CCGG 149.540 -999.990 ... R5 2000 02 16 12 41 00 78.9067 11.8883 479.00 474.00 5.00 166931 ZEP 2000 01 20 09 00 00 1379-91 P co CCGG 157.170 -999.990 ... R5 2000 02 16 11 06 00 78.9067 11.8883 479.00 474.00 5.00 166932 ZEP 2000 01 20 09 00 00 1380-91 P co CCGG 157.310 -999.990 ... R5 2000 02 16 11 20 00 78.9067 11.8883 479.00 474.00 5.00 166933 ZEP 2000 01 24 09 00 00 793-91 P co CCGG 152.200 -999.990 ... R5 2000 02 16 12 57 00 78.9067 11.8883 479.00 474.00 5.00 166934 ZEP 2000 01 24 09 00 00 794-91 P co CCGG 152.010 -999.990 ... R5 2000 02 16 13 10 00 78.9067 11.8883 479.00 474.00 5.00 166935 ZEP 2000 01 27 09 25 00 1329-91 P co CCGG 163.810 -999.990 ... R5 2000 02 16 10 19 00 78.9067 11.8883 479.00 474.00 5.00 166936 ZEP 2000 01 27 09 25 00 1330-91 P co CCGG 164.820 -999.990 ... R5 2000 02 16 10 33 00 78.9067 11.8883 479.00 474.00 5.00 166937 ZEP 2000 01 31 09 40 00 785-91 P co CCGG 162.230 -999.990 ... R5 2000 02 25 14 33 00 78.9067 11.8883 479.00 474.00 5.00 166938 ZEP 2000 01 31 09 40 00 786-91 P co CCGG 162.690 -999.990 ... R5 2000 02 25 14 47 00 78.9067 11.8883 479.00 474.00 5.00 166939 ZEP 2000 02 03 09 25 00 4085-91 P co CCGG 172.340 -999.990 ... R5 2000 03 02 12 29 00 78.9067 11.8883 479.00 474.00 5.00 166940 ZEP 2000 02 07 15 30 00 789-91 P co CCGG 156.610 -999.990 P.. R5 2000 02 25 15 55 00 78.9067 11.8883 479.00 474.00 5.00 166941 ZEP 2000 02 07 15 30 00 790-91 P co CCGG 160.290 -999.990 P.. R5 2000 02 25 16 09 00 78.9067 11.8883 479.00 474.00 5.00 166942 ZEP 2000 02 10 08 45 00 69-98 P co CCGG 170.100 -999.990 ... R5 2000 03 02 11 02 00 78.9067 11.8883 479.00 474.00 5.00 166943 ZEP 2000 02 10 08 45 00 70-98 P co CCGG 169.870 -999.990 ... R5 2000 03 02 11 16 00 78.9067 11.8883 479.00 474.00 5.00 166944 ZEP 2000 02 14 10 30 00 813-91 P co CCGG 178.360 -999.990 ... R5 2000 03 31 10 46 00 78.9067 11.8883 479.00 474.00 5.00 166945 ZEP 2000 02 14 10 30 00 814-91 P co CCGG 177.150 -999.990 ... R5 2000 03 31 10 59 00 78.9067 11.8883 479.00 474.00 5.00 166946 ZEP 2000 02 18 09 34 00 795-91 P co CCGG 170.880 -999.990 ... R5 2000 03 31 12 04 00 78.9067 11.8883 479.00 474.00 5.00 166947 ZEP 2000 02 18 09 34 00 796-91 P co CCGG 172.630 -999.990 ... R5 2000 03 31 12 17 00 78.9067 11.8883 479.00 474.00 5.00 166948 ZEP 2000 02 21 09 30 00 733-91 P co CCGG 167.710 -999.990 ... R5 2000 03 31 13 50 00 78.9067 11.8883 479.00 474.00 5.00 166949 ZEP 2000 02 21 09 30 00 734-91 P co CCGG 167.810 -999.990 ... R5 2000 03 31 14 03 00 78.9067 11.8883 479.00 474.00 5.00 166950 ZEP 2000 02 24 09 45 00 77-98 P co CCGG 164.660 -999.990 ... R5 2000 03 31 14 44 00 78.9067 11.8883 479.00 474.00 5.00 166951 ZEP 2000 02 24 09 45 00 78-98 P co CCGG 164.920 -999.990 ... R5 2000 03 31 14 57 00 78.9067 11.8883 479.00 474.00 5.00 166952 ZEP 2000 02 28 10 55 00 739-91 P co CCGG 157.600 -999.990 ... R5 2000 03 31 12 32 00 78.9067 11.8883 479.00 474.00 5.00 166953 ZEP 2000 02 28 10 55 00 740-91 P co CCGG 158.650 -999.990 ... R5 2000 03 31 12 45 00 78.9067 11.8883 479.00 474.00 5.00 166954 ZEP 2000 03 02 09 30 00 1403-91 P co CCGG 175.170 -999.990 ... R5 2000 03 31 14 18 00 78.9067 11.8883 479.00 474.00 5.00 166955 ZEP 2000 03 02 09 30 00 1404-91 P co CCGG 175.740 -999.990 ... R5 2000 03 31 14 31 00 78.9067 11.8883 479.00 474.00 5.00 166956 ZEP 2000 03 06 10 20 00 747-91 P co CCGG 183.500 -999.990 ... R5 2000 04 07 12 19 00 78.9067 11.8883 479.00 474.00 5.00 166957 ZEP 2000 03 06 10 20 00 748-91 P co CCGG 184.860 -999.990 ... R5 2000 04 07 12 32 00 78.9067 11.8883 479.00 474.00 5.00 166958 ZEP 2000 03 10 13 50 00 1171-91 P co CCGG 154.150 -999.990 ... R5 2000 04 10 12 30 00 78.9067 11.8883 479.00 474.00 5.00 166959 ZEP 2000 03 10 13 50 00 1172-91 P co CCGG 154.090 -999.990 ... R5 2000 04 10 12 43 00 78.9067 11.8883 479.00 474.00 5.00 166960 ZEP 2000 03 15 18 00 00 811-91 P co CCGG 179.580 -999.990 ... R5 2000 04 07 11 53 00 78.9067 11.8883 479.00 474.00 5.00 166961 ZEP 2000 03 15 18 00 00 812-91 P co CCGG 178.460 -999.990 ... R5 2000 04 07 12 06 00 78.9067 11.8883 479.00 474.00 5.00 166962 ZEP 2000 03 16 10 30 00 4741-91 P co CCGG 171.000 -999.990 ... R5 2000 04 10 12 56 00 78.9067 11.8883 479.00 474.00 5.00 166963 ZEP 2000 03 16 10 30 00 4742-91 P co CCGG 171.940 -999.990 ... R5 2000 04 10 13 09 00 78.9067 11.8883 479.00 474.00 5.00 166964 ZEP 2000 03 20 10 15 00 149-91 P co CCGG 161.690 -999.990 P.. R5 2000 04 25 09 23 00 78.9067 11.8883 479.00 474.00 5.00 166965 ZEP 2000 03 20 10 15 00 150-91 P co CCGG 156.850 -999.990 P.. R5 2000 04 25 09 37 00 78.9067 11.8883 479.00 474.00 5.00 166966 ZEP 2000 03 23 10 20 00 591-91 P co CCGG 174.270 -999.990 ... R5 2000 04 25 11 39 00 78.9067 11.8883 479.00 474.00 5.00 166967 ZEP 2000 03 23 10 20 00 592-91 P co CCGG 174.750 -999.990 ... R5 2000 04 25 11 52 00 78.9067 11.8883 479.00 474.00 5.00 166968 ZEP 2000 03 27 09 40 00 2019-91 P co CCGG 166.670 -999.990 ... R5 2000 04 25 10 16 00 78.9067 11.8883 479.00 474.00 5.00 166969 ZEP 2000 03 27 09 40 00 2020-91 P co CCGG 165.920 -999.990 ... R5 2000 04 25 10 29 00 78.9067 11.8883 479.00 474.00 5.00 166970 ZEP 2000 03 30 08 55 00 137-98 P co CCGG 166.550 -999.990 ... R5 2000 04 25 12 05 00 78.9067 11.8883 479.00 474.00 5.00 166971 ZEP 2000 03 30 08 55 00 138-98 P co CCGG 166.130 -999.990 ... R5 2000 04 25 12 18 00 78.9067 11.8883 479.00 474.00 5.00 166972 ZEP 2000 04 03 09 10 00 805-91 P co CCGG 160.350 -999.990 ... R5 2000 05 11 10 43 00 78.9067 11.8883 479.00 474.00 5.00 166973 ZEP 2000 04 03 09 10 00 806-91 P co CCGG 159.210 -999.990 ... R5 2000 05 11 10 56 00 78.9067 11.8883 479.00 474.00 5.00 166974 ZEP 2000 04 06 10 30 00 807-91 P co CCGG 161.130 -999.990 ... R5 2000 05 11 11 09 00 78.9067 11.8883 479.00 474.00 5.00 166975 ZEP 2000 04 10 10 50 00 809-91 P co CCGG 163.670 -999.990 ... R5 2000 05 11 11 22 00 78.9067 11.8883 479.00 474.00 5.00 166976 ZEP 2000 04 13 09 05 00 743-91 P co CCGG 165.220 -999.990 ... R5 2000 05 10 15 02 00 78.9067 11.8883 479.00 474.00 5.00 166977 ZEP 2000 04 13 09 05 00 744-91 P co CCGG 166.340 -999.990 ... R5 2000 05 10 15 15 00 78.9067 11.8883 479.00 474.00 5.00 166978 ZEP 2000 04 21 09 10 00 131-98 P co CCGG 163.020 -999.990 ... R5 2000 06 07 10 31 00 78.9067 11.8883 479.00 474.00 5.00 166979 ZEP 2000 04 21 09 10 00 132-98 P co CCGG 163.180 -999.990 ... R5 2000 06 07 10 44 00 78.9067 11.8883 479.00 474.00 5.00 166980 ZEP 2000 04 24 09 00 00 799-91 P co CCGG 165.210 -999.990 ... R5 2000 06 01 16 05 00 78.9067 11.8883 479.00 474.00 5.00 166981 ZEP 2000 04 24 09 00 00 800-91 P co CCGG 165.650 -999.990 ... R5 2000 06 01 16 18 00 78.9067 11.8883 479.00 474.00 5.00 166982 ZEP 2000 04 27 09 15 00 1725-91 P co CCGG 159.160 -999.990 ... R5 2000 06 07 10 57 00 78.9067 11.8883 479.00 474.00 5.00 166983 ZEP 2000 04 27 09 15 00 1726-91 P co CCGG 158.960 -999.990 ... R5 2000 06 07 11 10 00 78.9067 11.8883 479.00 474.00 5.00 166984 ZEP 2000 05 01 11 00 00 787-91 P co CCGG 157.110 -999.990 ... R5 2000 06 01 15 13 00 78.9067 11.8883 479.00 474.00 5.00 166985 ZEP 2000 05 01 11 00 00 788-91 P co CCGG 157.930 -999.990 ... R5 2000 06 01 15 26 00 78.9067 11.8883 479.00 474.00 5.00 166986 ZEP 2000 05 04 09 00 00 801-91 P co CCGG 151.840 -999.990 ... R5 2000 06 14 13 35 00 78.9067 11.8883 479.00 474.00 5.00 166987 ZEP 2000 05 04 09 00 00 802-91 P co CCGG 151.680 -999.990 ... R5 2000 06 14 13 48 00 78.9067 11.8883 479.00 474.00 5.00 166988 ZEP 2000 05 09 08 30 00 783-91 P co CCGG 148.210 -999.990 ... R5 2000 06 15 10 28 00 78.9067 11.8883 479.00 474.00 5.00 166989 ZEP 2000 05 09 08 30 00 784-91 P co CCGG 146.670 -999.990 ... R5 2000 06 15 10 41 00 78.9067 11.8883 479.00 474.00 5.00 166990 ZEP 2000 05 11 09 06 00 815-91 P co CCGG 151.350 -999.990 ... R5 2000 06 15 10 02 00 78.9067 11.8883 479.00 474.00 5.00 166991 ZEP 2000 05 11 09 06 00 816-91 P co CCGG 150.880 -999.990 ... R5 2000 06 15 10 15 00 78.9067 11.8883 479.00 474.00 5.00 166992 ZEP 2000 05 11 09 50 00 803-91 P co CCGG 149.670 -999.990 ... R5 2000 06 14 14 53 00 78.9067 11.8883 479.00 474.00 5.00 166993 ZEP 2000 05 11 09 50 00 804-91 P co CCGG 151.040 -999.990 ... R5 2000 06 14 15 06 00 78.9067 11.8883 479.00 474.00 5.00 166994 ZEP 2000 05 15 09 00 00 737-91 P co CCGG 147.590 -999.990 ... R5 2000 06 14 14 01 00 78.9067 11.8883 479.00 474.00 5.00 166995 ZEP 2000 05 15 09 00 00 738-91 P co CCGG 147.300 -999.990 ... R5 2000 06 14 14 14 00 78.9067 11.8883 479.00 474.00 5.00 166996 ZEP 2000 05 18 09 45 00 1981-91 P co CCGG 136.490 -999.990 ... R5 2000 06 13 13 56 00 78.9067 11.8883 479.00 474.00 5.00 166997 ZEP 2000 05 18 09 45 00 1982-91 P co CCGG 136.980 -999.990 ... R5 2000 06 13 14 10 00 78.9067 11.8883 479.00 474.00 5.00 166998 ZEP 2000 05 22 09 20 00 735-91 P co CCGG 134.940 -999.990 ... R5 2000 06 14 14 27 00 78.9067 11.8883 479.00 474.00 5.00 166999 ZEP 2000 05 22 09 20 00 736-91 P co CCGG 135.840 -999.990 ... R5 2000 06 14 14 40 00 78.9067 11.8883 479.00 474.00 5.00 167000 ZEP 2000 05 25 09 00 00 1085-91 P co CCGG 130.150 -999.990 ... R5 2000 06 13 14 23 00 78.9067 11.8883 479.00 474.00 5.00 167001 ZEP 2000 05 25 09 00 00 1086-91 P co CCGG 129.800 -999.990 ... R5 2000 06 13 14 36 00 78.9067 11.8883 479.00 474.00 5.00 167002 ZEP 2000 05 29 08 55 00 791-91 P co CCGG 128.250 -999.990 ... R5 2000 08 02 13 44 00 78.9067 11.8883 479.00 474.00 5.00 167003 ZEP 2000 05 29 08 55 00 792-91 P co CCGG 128.440 -999.990 ... R5 2000 08 02 13 57 00 78.9067 11.8883 479.00 474.00 5.00 167004 ZEP 2000 06 02 09 27 00 325-91 P co CCGG 144.840 -999.990 P.. R5 2000 08 03 10 08 00 78.9067 11.8883 479.00 474.00 5.00 167005 ZEP 2000 06 02 09 27 00 326-91 P co CCGG 150.730 -999.990 P.. R5 2000 08 03 10 21 00 78.9067 11.8883 479.00 474.00 5.00 167006 ZEP 2000 06 05 09 30 00 733-91 P co CCGG 118.080 -999.990 ... R5 2000 08 02 14 10 00 78.9067 11.8883 479.00 474.00 5.00 167007 ZEP 2000 06 05 09 30 00 734-91 P co CCGG 118.100 -999.990 ... R5 2000 08 02 14 23 00 78.9067 11.8883 479.00 474.00 5.00 167008 ZEP 2000 06 08 09 25 00 4221-91 P co CCGG 118.930 -999.990 P.. R5 2000 08 03 11 28 00 78.9067 11.8883 479.00 474.00 5.00 167009 ZEP 2000 06 08 09 25 00 4222-91 P co CCGG 114.040 -999.990 P.. R5 2000 08 03 11 41 00 78.9067 11.8883 479.00 474.00 5.00 167010 ZEP 2000 06 12 09 30 00 739-91 P co CCGG 108.170 -999.990 ... R5 2000 08 02 12 50 00 78.9067 11.8883 479.00 474.00 5.00 167011 ZEP 2000 06 12 09 30 00 740-91 P co CCGG 110.030 -999.990 ... R5 2000 08 02 13 03 00 78.9067 11.8883 479.00 474.00 5.00 167012 ZEP 2000 06 15 09 00 00 811-91 P co CCGG 108.970 -999.990 ... R5 2000 08 02 11 30 00 78.9067 11.8883 479.00 474.00 5.00 167013 ZEP 2000 06 15 09 00 00 812-91 P co CCGG 111.070 -999.990 ... R5 2000 08 02 11 43 00 78.9067 11.8883 479.00 474.00 5.00 167014 ZEP 2000 06 19 09 15 00 813-91 P co CCGG 104.310 -999.990 ... R5 2000 08 04 11 12 00 78.9067 11.8883 479.00 474.00 5.00 167015 ZEP 2000 06 19 09 15 00 814-91 P co CCGG 103.710 -999.990 ... R5 2000 08 04 11 25 00 78.9067 11.8883 479.00 474.00 5.00 167016 ZEP 2000 06 22 09 05 00 4167-91 P co CCGG 100.340 -999.990 ... R5 2000 08 03 09 42 00 78.9067 11.8883 479.00 474.00 5.00 167017 ZEP 2000 06 22 09 05 00 4168-91 P co CCGG 101.200 -999.990 ... R5 2000 08 03 09 55 00 78.9067 11.8883 479.00 474.00 5.00 167018 ZEP 2000 06 26 09 19 00 785-91 P co CCGG 94.600 -999.990 ... R5 2000 08 04 11 38 00 78.9067 11.8883 479.00 474.00 5.00 167019 ZEP 2000 06 26 09 19 00 786-91 P co CCGG 94.300 -999.990 ... R5 2000 08 04 11 51 00 78.9067 11.8883 479.00 474.00 5.00 167020 ZEP 2000 06 29 09 05 00 223-91 P co CCGG 89.310 -999.990 ... R5 2000 08 02 15 03 00 78.9067 11.8883 479.00 474.00 5.00 167021 ZEP 2000 06 29 09 05 00 224-91 P co CCGG 89.990 -999.990 ... R5 2000 08 02 15 16 00 78.9067 11.8883 479.00 474.00 5.00 167022 ZEP 2000 07 03 09 02 00 789-91 P co CCGG 86.100 -999.990 ... R5 2000 08 02 14 36 00 78.9067 11.8883 479.00 474.00 5.00 167023 ZEP 2000 07 03 09 02 00 790-91 P co CCGG 86.220 -999.990 ... R5 2000 08 02 14 49 00 78.9067 11.8883 479.00 474.00 5.00 167024 ZEP 2000 07 06 08 50 00 4201-91 P co CCGG 86.580 -999.990 ... R5 2000 08 03 14 34 00 78.9067 11.8883 479.00 474.00 5.00 167025 ZEP 2000 07 06 08 50 00 4202-91 P co CCGG 86.000 -999.990 ... R5 2000 08 03 14 47 00 78.9067 11.8883 479.00 474.00 5.00 167026 ZEP 2000 07 11 08 05 00 445-91 P co CCGG 85.140 -999.990 ... R5 2000 08 03 14 08 00 78.9067 11.8883 479.00 474.00 5.00 167027 ZEP 2000 07 11 08 05 00 446-91 P co CCGG 83.830 -999.990 ... R5 2000 08 03 14 21 00 78.9067 11.8883 479.00 474.00 5.00 167028 ZEP 2000 07 13 08 57 00 4051-91 P co CCGG 75.150 -999.990 ... R5 2000 09 22 11 18 00 78.9067 11.8883 479.00 474.00 5.00 167029 ZEP 2000 07 13 08 57 00 4052-91 P co CCGG 76.950 -999.990 ... R5 2000 09 22 11 31 00 78.9067 11.8883 479.00 474.00 5.00 167030 ZEP 2000 07 17 09 16 00 781-91 P co CCGG 85.030 -999.990 ... R5 2000 08 02 13 16 00 78.9067 11.8883 479.00 474.00 5.00 167031 ZEP 2000 07 17 09 16 00 782-91 P co CCGG 84.580 -999.990 ... R5 2000 08 02 13 29 00 78.9067 11.8883 479.00 474.00 5.00 167032 ZEP 2000 07 20 08 55 00 677-91 P co CCGG 98.270 -999.990 ... R5 2000 09 22 13 30 00 78.9067 11.8883 479.00 474.00 5.00 167033 ZEP 2000 07 20 08 55 00 678-91 P co CCGG 96.640 -999.990 ... R5 2000 09 22 13 43 00 78.9067 11.8883 479.00 474.00 5.00 167034 ZEP 2000 07 24 09 30 00 745-91 P co CCGG 85.470 -999.990 ... R5 2000 09 27 15 01 00 78.9067 11.8883 479.00 474.00 5.00 167035 ZEP 2000 07 24 09 30 00 746-91 P co CCGG 82.850 -999.990 ... R5 2000 09 27 15 14 00 78.9067 11.8883 479.00 474.00 5.00 167036 ZEP 2000 07 27 08 52 00 1855-91 P co CCGG 79.210 -999.990 ... R5 2000 09 27 15 27 00 78.9067 11.8883 479.00 474.00 5.00 167037 ZEP 2000 07 27 08 52 00 1856-91 P co CCGG 79.630 -999.990 ... R5 2000 09 27 15 40 00 78.9067 11.8883 479.00 474.00 5.00 167038 ZEP 2000 08 01 12 34 56 793-91 P co CCGG 82.300 -999.990 ... R5 2000 09 27 14 35 00 78.9067 11.8883 479.00 474.00 5.00 167039 ZEP 2000 08 01 12 34 56 794-91 P co CCGG 81.620 -999.990 ... R5 2000 09 27 14 48 00 78.9067 11.8883 479.00 474.00 5.00 167040 ZEP 2000 08 03 08 59 00 181-91 P co CCGG 82.300 -999.990 ... R5 2000 09 28 09 48 00 78.9067 11.8883 479.00 474.00 5.00 167041 ZEP 2000 08 03 08 59 00 182-91 P co CCGG 81.460 -999.990 ... R5 2000 09 28 10 01 00 78.9067 11.8883 479.00 474.00 5.00 167042 ZEP 2000 08 07 08 59 00 4007-91 P co CCGG 90.790 -999.990 ... R5 2000 09 26 10 25 00 78.9067 11.8883 479.00 474.00 5.00 167043 ZEP 2000 08 07 08 59 00 4008-91 P co CCGG 90.540 -999.990 ... R5 2000 09 26 10 38 00 78.9067 11.8883 479.00 474.00 5.00 167044 ZEP 2000 08 10 09 05 00 645-91 P co CCGG 98.300 -999.990 ... R5 2000 09 18 11 00 00 78.9067 11.8883 479.00 474.00 5.00 167045 ZEP 2000 08 10 09 05 00 646-91 P co CCGG 97.920 -999.990 ... R5 2000 09 18 11 13 00 78.9067 11.8883 479.00 474.00 5.00 167046 ZEP 2000 08 14 09 36 00 755-91 P co CCGG 83.750 -999.990 ... R5 2000 09 26 09 31 00 78.9067 11.8883 479.00 474.00 5.00 167047 ZEP 2000 08 14 09 36 00 756-91 P co CCGG 85.290 -999.990 ... R5 2000 09 26 09 44 00 78.9067 11.8883 479.00 474.00 5.00 167048 ZEP 2000 08 18 10 12 00 73-98 P co CCGG 89.860 -999.990 ... R5 2000 09 18 12 18 00 78.9067 11.8883 479.00 474.00 5.00 167049 ZEP 2000 08 18 10 12 00 74-98 P co CCGG 89.350 -999.990 ... R5 2000 09 18 12 31 00 78.9067 11.8883 479.00 474.00 5.00 167050 ZEP 2000 08 22 08 30 00 737-91 P co CCGG 79.960 -999.990 ... R5 2000 09 22 11 44 00 78.9067 11.8883 479.00 474.00 5.00 167051 ZEP 2000 08 22 08 30 00 738-91 P co CCGG 79.660 -999.990 ... R5 2000 09 22 11 57 00 78.9067 11.8883 479.00 474.00 5.00 167052 ZEP 2000 08 29 08 54 00 803-91 P co CCGG 79.570 -999.990 ... R5 2000 09 22 12 10 00 78.9067 11.8883 479.00 474.00 5.00 167053 ZEP 2000 08 29 08 54 00 804-91 P co CCGG 80.040 -999.990 ... R5 2000 09 22 12 23 00 78.9067 11.8883 479.00 474.00 5.00 167054 ZEP 2000 09 01 10 10 00 41-91 P co CCGG 87.940 -999.990 ... R5 2000 11 01 09 00 00 78.9067 11.8883 479.00 474.00 5.00 167055 ZEP 2000 09 01 10 10 00 42-91 P co CCGG 88.560 -999.990 ... R5 2000 11 01 09 13 00 78.9067 11.8883 479.00 474.00 5.00 167056 ZEP 2000 09 07 09 35 00 1161-91 P co CCGG 96.810 -999.990 ... R5 2000 11 01 09 28 00 78.9067 11.8883 479.00 474.00 5.00 167057 ZEP 2000 09 07 09 35 00 1162-91 P co CCGG 96.570 -999.990 ... R5 2000 11 01 09 41 00 78.9067 11.8883 479.00 474.00 5.00 167058 ZEP 2000 09 12 09 48 00 795-91 P co CCGG 90.260 -999.990 ... R5 2000 10 31 13 01 00 78.9067 11.8883 479.00 474.00 5.00 167059 ZEP 2000 09 12 09 48 00 796-91 P co CCGG 91.230 -999.990 ... R5 2000 10 31 13 14 00 78.9067 11.8883 479.00 474.00 5.00 167060 ZEP 2000 09 18 08 55 00 747-91 P co CCGG 90.330 -999.990 ... R5 2000 10 31 13 27 00 78.9067 11.8883 479.00 474.00 5.00 167061 ZEP 2000 09 21 09 07 00 317-91 P co CCGG 92.980 -999.990 ... R5 2000 10 31 11 01 00 78.9067 11.8883 479.00 474.00 5.00 167062 ZEP 2000 09 21 09 07 00 318-91 P co CCGG 92.750 -999.990 ... R5 2000 10 31 11 14 00 78.9067 11.8883 479.00 474.00 5.00 167063 ZEP 2000 09 25 08 15 00 785-91 P co CCGG 92.300 -999.990 ... R5 2000 10 31 11 54 00 78.9067 11.8883 479.00 474.00 5.00 167064 ZEP 2000 09 25 08 15 00 786-91 P co CCGG 92.630 -999.990 ... R5 2000 10 31 12 07 00 78.9067 11.8883 479.00 474.00 5.00 167065 ZEP 2000 09 29 08 15 00 1693-91 P co CCGG 94.830 -999.990 ... R5 2000 10 31 11 28 00 78.9067 11.8883 479.00 474.00 5.00 167066 ZEP 2000 09 29 08 15 00 1694-91 P co CCGG 95.760 -999.990 ... R5 2000 10 31 11 41 00 78.9067 11.8883 479.00 474.00 5.00 167067 ZEP 2000 10 02 09 05 00 813-91 P co CCGG 97.470 -999.990 ... R5 2000 10 31 12 21 00 78.9067 11.8883 479.00 474.00 5.00 167068 ZEP 2000 10 02 09 05 00 814-91 P co CCGG 97.250 -999.990 ... R5 2000 10 31 12 34 00 78.9067 11.8883 479.00 474.00 5.00 167069 ZEP 2000 10 06 09 45 00 277-91 P co CCGG 97.010 -999.990 ... R5 2000 11 01 12 08 00 78.9067 11.8883 479.00 474.00 5.00 167070 ZEP 2000 10 06 09 45 00 278-91 P co CCGG 98.500 -999.990 ... R5 2000 11 01 12 21 00 78.9067 11.8883 479.00 474.00 5.00 167071 ZEP 2000 10 06 10 25 00 1759-91 P co CCGG 96.960 -999.990 ... R5 2000 11 01 12 34 00 78.9067 11.8883 479.00 474.00 5.00 167072 ZEP 2000 10 06 10 25 00 1760-91 P co CCGG 96.700 -999.990 ... R5 2000 11 01 12 47 00 78.9067 11.8883 479.00 474.00 5.00 167073 ZEP 2000 10 09 09 35 00 811-91 P co CCGG 104.930 -999.990 ... R5 2000 11 01 11 14 00 78.9067 11.8883 479.00 474.00 5.00 167074 ZEP 2000 10 09 09 35 00 812-91 P co CCGG 103.720 -999.990 ... R5 2000 11 01 11 27 00 78.9067 11.8883 479.00 474.00 5.00 167075 ZEP 2000 10 13 10 17 00 283-91 P co CCGG 122.550 -999.990 .X. R5 2000 12 07 13 51 00 78.9067 11.8883 479.00 474.00 5.00 167076 ZEP 2000 10 13 10 17 00 284-91 P co CCGG 121.130 -999.990 .X. R5 2000 12 07 14 04 00 78.9067 11.8883 479.00 474.00 5.00 167077 ZEP 2000 10 16 10 07 00 789-91 P co CCGG 103.040 -999.990 ... R5 2000 11 01 11 40 00 78.9067 11.8883 479.00 474.00 5.00 167078 ZEP 2000 10 16 10 07 00 790-91 P co CCGG 103.090 -999.990 ... R5 2000 11 01 11 53 00 78.9067 11.8883 479.00 474.00 5.00 167079 ZEP 2000 10 20 09 50 00 1671-91 P co CCGG 108.190 -999.990 ... R5 2000 12 11 07 58 00 78.9067 11.8883 479.00 474.00 5.00 167080 ZEP 2000 10 20 09 50 00 1672-91 P co CCGG 106.960 -999.990 ... R5 2000 12 11 08 11 00 78.9067 11.8883 479.00 474.00 5.00 167081 ZEP 2000 10 24 07 34 00 805-91 P co CCGG 107.430 -999.990 ... R5 2000 12 07 12 57 00 78.9067 11.8883 479.00 474.00 5.00 167082 ZEP 2000 10 24 07 34 00 806-91 P co CCGG 105.460 -999.990 ... R5 2000 12 07 13 10 00 78.9067 11.8883 479.00 474.00 5.00 167083 ZEP 2000 10 28 13 32 00 743-91 P co CCGG 108.180 -999.990 ... R5 2000 12 07 13 23 00 78.9067 11.8883 479.00 474.00 5.00 167084 ZEP 2000 10 28 13 32 00 744-91 P co CCGG 106.660 -999.990 ... R5 2000 12 07 13 36 00 78.9067 11.8883 479.00 474.00 5.00 167085 ZEP 2000 11 02 09 45 00 4373-91 P co CCGG 106.780 -999.990 ... R5 2000 12 07 12 31 00 78.9067 11.8883 479.00 474.00 5.00 167086 ZEP 2000 11 02 09 45 00 4374-91 P co CCGG 105.850 -999.990 ... R5 2000 12 07 12 44 00 78.9067 11.8883 479.00 474.00 5.00 167087 ZEP 2000 11 07 10 09 00 791-91 P co CCGG 119.690 -999.990 ... R5 2000 12 08 09 56 00 78.9067 11.8883 479.00 474.00 5.00 167088 ZEP 2000 11 07 10 09 00 792-91 P co CCGG 119.380 -999.990 ... R5 2000 12 08 10 09 00 78.9067 11.8883 479.00 474.00 5.00 167089 ZEP 2000 11 10 09 50 00 4946-91 P co CCGG 119.220 -999.990 ... R5 2000 12 07 12 05 00 78.9067 11.8883 479.00 474.00 5.00 167090 ZEP 2000 11 10 09 50 00 4947-91 P co CCGG 119.290 -999.990 ... R5 2000 12 07 12 18 00 78.9067 11.8883 479.00 474.00 5.00 167091 ZEP 2000 11 13 12 34 56 781-91 P co CCGG 118.330 -999.990 ... R5 2000 12 08 10 22 00 78.9067 11.8883 479.00 474.00 5.00 167092 ZEP 2000 11 13 12 34 56 782-91 P co CCGG 118.910 -999.990 ... R5 2000 12 08 10 35 00 78.9067 11.8883 479.00 474.00 5.00 167093 ZEP 2000 11 16 08 30 00 4955-91 P co CCGG 116.780 -999.990 ... R5 2000 12 19 12 05 00 78.9067 11.8883 479.00 474.00 5.00 167094 ZEP 2000 11 16 08 30 00 4956-91 P co CCGG 117.040 -999.990 ... R5 2000 12 19 12 18 00 78.9067 11.8883 479.00 474.00 5.00 167095 ZEP 2000 11 20 08 55 00 815-91 P co CCGG 122.340 -999.990 ... R5 2000 12 27 13 18 00 78.9067 11.8883 479.00 474.00 5.00 167096 ZEP 2000 11 20 08 55 00 816-91 P co CCGG 122.050 -999.990 ... R5 2000 12 27 13 31 00 78.9067 11.8883 479.00 474.00 5.00 167097 ZEP 2000 11 24 10 05 00 1397-91 P co CCGG 124.330 -999.990 ... R5 2000 12 19 11 39 00 78.9067 11.8883 479.00 474.00 5.00 167098 ZEP 2000 11 24 10 05 00 1398-91 P co CCGG 123.520 -999.990 ... R5 2000 12 19 11 52 00 78.9067 11.8883 479.00 474.00 5.00 167099 ZEP 2000 11 27 09 29 00 783-91 P co CCGG 126.450 -999.990 ... R5 2000 12 27 12 52 00 78.9067 11.8883 479.00 474.00 5.00 167100 ZEP 2000 11 27 09 29 00 784-91 P co CCGG 125.880 -999.990 ... R5 2000 12 27 13 05 00 78.9067 11.8883 479.00 474.00 5.00 167101 ZEP 2000 11 30 10 38 00 1769-91 P co CCGG 124.680 -999.990 ... R5 2001 01 17 14 58 00 78.9067 11.8883 479.00 474.00 5.00 167102 ZEP 2000 11 30 10 38 00 1770-91 P co CCGG 123.280 -999.990 ... R5 2001 01 17 15 11 00 78.9067 11.8883 479.00 474.00 5.00 167103 ZEP 2000 12 04 11 21 00 801-91 P co CCGG 132.420 -999.990 ... R5 2001 01 18 08 59 00 78.9067 11.8883 479.00 474.00 5.00 167104 ZEP 2000 12 04 11 21 00 802-91 P co CCGG 131.460 -999.990 ... R5 2001 01 18 09 12 00 78.9067 11.8883 479.00 474.00 5.00 167105 ZEP 2000 12 07 09 36 00 4525-91 P co CCGG 129.650 -999.990 ... R5 2001 01 17 14 30 00 78.9067 11.8883 479.00 474.00 5.00 167106 ZEP 2000 12 07 09 36 00 4526-91 P co CCGG 130.150 -999.990 ... R5 2001 01 17 14 43 00 78.9067 11.8883 479.00 474.00 5.00 167107 ZEP 2000 12 18 09 25 00 733-91 P co CCGG 131.330 -999.990 ... R5 2001 01 18 11 39 00 78.9067 11.8883 479.00 474.00 5.00 167108 ZEP 2000 12 18 09 25 00 734-91 P co CCGG 130.030 -999.990 ... R5 2001 01 18 11 52 00 78.9067 11.8883 479.00 474.00 5.00 167109 ZEP 2000 12 21 09 10 00 1055-91 P co CCGG 140.170 -999.990 ... R5 2001 01 17 13 12 00 78.9067 11.8883 479.00 474.00 5.00 167110 ZEP 2000 12 21 09 10 00 1056-91 P co CCGG 141.010 -999.990 ... R5 2001 01 17 13 25 00 78.9067 11.8883 479.00 474.00 5.00 167111 ZEP 2000 12 25 09 50 00 739-91 P co CCGG 152.900 -999.990 ... R5 2001 01 18 12 05 00 78.9067 11.8883 479.00 474.00 5.00 167112 ZEP 2000 12 25 09 50 00 740-91 P co CCGG 153.060 -999.990 ... R5 2001 01 18 12 18 00 78.9067 11.8883 479.00 474.00 5.00 167113 ZEP 2000 12 28 08 25 00 485-91 P co CCGG 143.550 -999.990 ... R5 2001 01 17 13 38 00 78.9067 11.8883 479.00 474.00 5.00 167114 ZEP 2000 12 28 08 25 00 486-91 P co CCGG 144.470 -999.990 ... R5 2001 01 17 13 51 00 78.9067 11.8883 479.00 474.00 5.00 167115 ZEP 2001 01 01 12 34 56 735-91 P co CCGG 139.320 -999.990 ... R5 2001 01 18 09 25 00 78.9067 11.8883 479.00 474.00 5.00 167116 ZEP 2001 01 01 12 34 56 736-91 P co CCGG 139.860 -999.990 ... R5 2001 01 18 09 38 00 78.9067 11.8883 479.00 474.00 5.00 167117 ZEP 2001 01 04 11 00 00 4503-91 P co CCGG 165.510 -999.990 ... R5 2001 02 01 13 05 00 78.9067 11.8883 479.00 474.00 5.00 167118 ZEP 2001 01 04 11 00 00 4504-91 P co CCGG 164.370 -999.990 ... R5 2001 02 01 13 18 00 78.9067 11.8883 479.00 474.00 5.00 167119 ZEP 2001 01 08 10 20 00 787-91 P co CCGG 149.640 -999.990 ... R5 2001 02 01 12 39 00 78.9067 11.8883 479.00 474.00 5.00 167120 ZEP 2001 01 08 10 20 00 788-91 P co CCGG 150.220 -999.990 ... R5 2001 02 01 12 52 00 78.9067 11.8883 479.00 474.00 5.00 167121 ZEP 2001 01 11 08 42 00 4033-91 P co CCGG 169.010 -999.990 ... R5 2001 02 01 12 13 00 78.9067 11.8883 479.00 474.00 5.00 167122 ZEP 2001 01 11 08 42 00 4034-91 P co CCGG 167.370 -999.990 ... R5 2001 02 01 12 26 00 78.9067 11.8883 479.00 474.00 5.00 167123 ZEP 2001 01 15 09 55 00 799-91 P co CCGG 162.970 -999.990 ... R5 2001 02 01 11 47 00 78.9067 11.8883 479.00 474.00 5.00 167124 ZEP 2001 01 15 09 55 00 800-91 P co CCGG 164.110 -999.990 ... R5 2001 02 01 12 00 00 78.9067 11.8883 479.00 474.00 5.00 167125 ZEP 2001 01 18 08 30 00 597-91 P co CCGG 165.510 -999.990 ... R5 2001 02 14 10 47 00 78.9067 11.8883 479.00 474.00 5.00 167126 ZEP 2001 01 18 08 30 00 598-91 P co CCGG 164.860 -999.990 ... R5 2001 02 14 11 00 00 78.9067 11.8883 479.00 474.00 5.00 167127 ZEP 2001 01 22 10 05 00 795-91 P co CCGG 143.310 -999.990 P.. R5 2001 02 14 12 07 00 78.9067 11.8883 479.00 474.00 5.00 167128 ZEP 2001 01 22 10 05 00 796-91 P co CCGG 146.500 -999.990 P.. R5 2001 02 14 12 20 00 78.9067 11.8883 479.00 474.00 5.00 167129 ZEP 2001 01 25 09 10 00 359-91 P co CCGG 157.070 -999.990 ... R5 2001 02 14 12 59 00 78.9067 11.8883 479.00 474.00 5.00 167130 ZEP 2001 01 25 09 10 00 360-91 P co CCGG 155.120 -999.990 ... R5 2001 02 14 13 12 00 78.9067 11.8883 479.00 474.00 5.00 167131 ZEP 2001 01 29 09 40 00 737-91 P co CCGG 161.840 -999.990 ... R5 2001 02 14 12 33 00 78.9067 11.8883 479.00 474.00 5.00 167132 ZEP 2001 01 29 09 40 00 738-91 P co CCGG 161.760 -999.990 ... R5 2001 02 14 12 46 00 78.9067 11.8883 479.00 474.00 5.00 167133 ZEP 2001 02 04 13 10 00 789-91 P co CCGG 155.390 -999.990 P.. R5 2001 03 12 09 44 00 78.9067 11.8883 479.00 474.00 5.00 167134 ZEP 2001 02 04 13 10 00 790-91 P co CCGG 162.860 -999.990 P.. R5 2001 03 12 09 58 00 78.9067 11.8883 479.00 474.00 5.00 167135 ZEP 2001 02 08 08 13 00 1579-91 P co CCGG 183.240 -999.990 .X. R5 2001 03 12 16 23 00 78.9067 11.8883 479.00 474.00 5.00 167136 ZEP 2001 02 08 08 13 00 1580-91 P co CCGG 180.320 -999.990 .X. R5 2001 03 12 16 36 00 78.9067 11.8883 479.00 474.00 5.00 167137 ZEP 2001 02 12 10 25 00 4007-91 P co CCGG 148.350 -999.990 ... R5 2001 03 08 13 15 00 78.9067 11.8883 479.00 474.00 5.00 167138 ZEP 2001 02 15 08 30 00 569-91 P co CCGG 151.580 -999.990 ... R5 2001 03 12 15 05 00 78.9067 11.8883 479.00 474.00 5.00 167139 ZEP 2001 02 15 08 30 00 570-91 P co CCGG 150.330 -999.990 ... R5 2001 03 12 15 18 00 78.9067 11.8883 479.00 474.00 5.00 167140 ZEP 2001 02 20 09 50 00 91-91 P co CCGG 152.490 -999.990 ... R5 2001 03 28 08 55 00 78.9067 11.8883 479.00 474.00 5.00 167141 ZEP 2001 02 20 09 50 00 92-91 P co CCGG 150.800 -999.990 ... R5 2001 03 28 09 08 00 78.9067 11.8883 479.00 474.00 5.00 167142 ZEP 2001 02 22 09 32 00 1113-91 P co CCGG 171.690 -999.990 ... R5 2001 03 23 10 00 00 78.9067 11.8883 479.00 474.00 5.00 167143 ZEP 2001 02 22 09 32 00 1114-91 P co CCGG 173.500 -999.990 ... R5 2001 03 23 10 13 00 78.9067 11.8883 479.00 474.00 5.00 167144 ZEP 2001 02 26 10 23 00 301-91 P co CCGG 157.690 -999.990 ... R5 2001 03 28 09 21 00 78.9067 11.8883 479.00 474.00 5.00 167145 ZEP 2001 02 26 10 23 00 302-91 P co CCGG 156.200 -999.990 ... R5 2001 03 28 09 34 00 78.9067 11.8883 479.00 474.00 5.00 167146 ZEP 2001 03 01 12 50 00 4263-91 P co CCGG 160.820 -999.990 ... R5 2001 03 23 10 52 00 78.9067 11.8883 479.00 474.00 5.00 167147 ZEP 2001 03 01 12 50 00 4264-91 P co CCGG 161.170 -999.990 ... R5 2001 03 23 11 05 00 78.9067 11.8883 479.00 474.00 5.00 167148 ZEP 2001 03 05 09 25 00 781-91 P co CCGG 163.990 -999.990 ... R5 2001 04 13 12 12 00 78.9067 11.8883 479.00 474.00 5.00 167149 ZEP 2001 03 05 09 25 00 782-91 P co CCGG 161.710 -999.990 ... R5 2001 04 13 12 25 00 78.9067 11.8883 479.00 474.00 5.00 167150 ZEP 2001 03 08 09 38 00 39-98 P co CCGG 171.600 -999.990 ... R5 2001 04 17 12 01 00 78.9067 11.8883 479.00 474.00 5.00 167151 ZEP 2001 03 08 09 38 00 40-98 P co CCGG 172.210 -999.990 ... R5 2001 04 17 12 14 00 78.9067 11.8883 479.00 474.00 5.00 167152 ZEP 2001 03 12 08 57 00 791-91 P co CCGG 171.770 -999.990 ... R5 2001 04 13 11 46 00 78.9067 11.8883 479.00 474.00 5.00 167153 ZEP 2001 03 12 08 57 00 792-91 P co CCGG 170.240 -999.990 ... R5 2001 04 13 11 59 00 78.9067 11.8883 479.00 474.00 5.00 167154 ZEP 2001 03 15 08 20 00 1429-91 P co CCGG 164.550 -999.990 ... R5 2001 04 17 11 35 00 78.9067 11.8883 479.00 474.00 5.00 167155 ZEP 2001 03 15 08 20 00 1430-91 P co CCGG 166.040 -999.990 ... R5 2001 04 17 11 48 00 78.9067 11.8883 479.00 474.00 5.00 167156 ZEP 2001 03 19 09 42 00 811-91 P co CCGG 170.040 -999.990 ... R5 2001 04 23 11 01 00 78.9067 11.8883 479.00 474.00 5.00 167157 ZEP 2001 03 19 09 42 00 812-91 P co CCGG 168.140 -999.990 ... R5 2001 04 23 11 14 00 78.9067 11.8883 479.00 474.00 5.00 167158 ZEP 2001 03 22 09 44 00 353-91 P co CCGG 166.630 -999.990 P.. R5 2001 04 23 14 33 00 78.9067 11.8883 479.00 474.00 5.00 167159 ZEP 2001 03 22 09 44 00 354-91 P co CCGG 172.770 -999.990 P.. R5 2001 04 23 14 46 00 78.9067 11.8883 479.00 474.00 5.00 167160 ZEP 2001 03 26 07 55 00 803-91 P co CCGG 165.530 -999.990 ... R5 2001 04 24 13 42 00 78.9067 11.8883 479.00 474.00 5.00 167161 ZEP 2001 03 26 07 55 00 804-91 P co CCGG 164.410 -999.990 ... R5 2001 04 24 13 55 00 78.9067 11.8883 479.00 474.00 5.00 167162 ZEP 2001 03 29 09 00 00 547-91 P co CCGG 166.020 -999.990 P.. R5 2001 04 23 15 52 00 78.9067 11.8883 479.00 474.00 5.00 167163 ZEP 2001 03 29 09 00 00 548-91 P co CCGG 161.650 -999.990 P.. R5 2001 04 23 16 05 00 78.9067 11.8883 479.00 474.00 5.00 167164 ZEP 2001 04 02 07 42 00 4627-91 P co CCGG 161.160 -999.990 ... R5 2001 05 04 12 09 00 78.9067 11.8883 479.00 474.00 5.00 167165 ZEP 2001 04 02 07 42 00 4628-91 P co CCGG 159.720 -999.990 ... R5 2001 05 04 12 22 00 78.9067 11.8883 479.00 474.00 5.00 167166 ZEP 2001 04 05 08 47 00 1379-91 P co CCGG 178.700 -999.990 ... R5 2001 05 07 10 48 00 78.9067 11.8883 479.00 474.00 5.00 167167 ZEP 2001 04 05 08 47 00 1380-91 P co CCGG 178.940 -999.990 ... R5 2001 05 07 11 01 00 78.9067 11.8883 479.00 474.00 5.00 167168 ZEP 2001 04 09 08 22 00 4637-91 P co CCGG 165.510 -999.990 ... R5 2001 05 04 13 01 00 78.9067 11.8883 479.00 474.00 5.00 167169 ZEP 2001 04 09 08 22 00 4638-91 P co CCGG 166.200 -999.990 ... R5 2001 05 04 13 14 00 78.9067 11.8883 479.00 474.00 5.00 167170 ZEP 2001 04 12 07 25 00 4455-91 P co CCGG 164.930 -999.990 ... R5 2001 05 07 11 14 00 78.9067 11.8883 479.00 474.00 5.00 167171 ZEP 2001 04 12 07 25 00 4456-91 P co CCGG 164.010 -999.990 ... R5 2001 05 07 11 27 00 78.9067 11.8883 479.00 474.00 5.00 167172 ZEP 2001 04 16 07 30 00 785-91 P co CCGG 153.480 -999.990 ... R5 2001 05 23 11 02 00 78.9067 11.8883 479.00 474.00 5.00 167173 ZEP 2001 04 16 07 30 00 786-91 P co CCGG 153.030 -999.990 ... R5 2001 05 23 11 15 00 78.9067 11.8883 479.00 474.00 5.00 167174 ZEP 2001 04 19 08 30 00 2007-91 P co CCGG 163.840 -999.990 ... R5 2001 05 23 10 34 00 78.9067 11.8883 479.00 474.00 5.00 167175 ZEP 2001 04 19 08 30 00 2008-91 P co CCGG 163.010 -999.990 ... R5 2001 05 23 10 47 00 78.9067 11.8883 479.00 474.00 5.00 167176 ZEP 2001 04 23 12 34 56 813-91 P co CCGG 163.870 -999.990 ... R5 2001 05 23 12 20 00 78.9067 11.8883 479.00 474.00 5.00 167177 ZEP 2001 04 23 12 34 56 814-91 P co CCGG 164.360 -999.990 ... R5 2001 05 23 12 34 00 78.9067 11.8883 479.00 474.00 5.00 167178 ZEP 2001 04 26 08 03 00 1323-91 P co CCGG 144.630 -999.990 ... R5 2001 05 23 11 54 00 78.9067 11.8883 479.00 474.00 5.00 167179 ZEP 2001 04 26 08 03 00 1324-91 P co CCGG 143.780 -999.990 ... R5 2001 05 23 12 07 00 78.9067 11.8883 479.00 474.00 5.00 167180 ZEP 2001 04 30 09 40 00 745-91 P co CCGG 149.370 -999.990 ... R5 2001 06 08 14 28 00 78.9067 11.8883 479.00 474.00 5.00 167181 ZEP 2001 04 30 09 40 00 746-91 P co CCGG 148.430 -999.990 ... R5 2001 06 08 14 41 00 78.9067 11.8883 479.00 474.00 5.00 167182 ZEP 2001 05 03 07 58 00 1465-91 P co CCGG 146.880 -999.990 ... R5 2001 06 06 11 47 00 78.9067 11.8883 479.00 474.00 5.00 167183 ZEP 2001 05 03 07 58 00 1466-91 P co CCGG 147.190 -999.990 ... R5 2001 06 06 12 00 00 78.9067 11.8883 479.00 474.00 5.00 167184 ZEP 2001 05 10 09 15 00 29-91 P co CCGG 157.920 -999.990 ... R5 2001 06 06 12 13 00 78.9067 11.8883 479.00 474.00 5.00 167185 ZEP 2001 05 10 09 15 00 30-91 P co CCGG 158.270 -999.990 ... R5 2001 06 06 12 27 00 78.9067 11.8883 479.00 474.00 5.00 167186 ZEP 2001 05 17 08 00 00 793-91 P co CCGG 144.920 -999.990 ... R5 2001 06 08 14 54 00 78.9067 11.8883 479.00 474.00 5.00 167187 ZEP 2001 05 17 08 00 00 794-91 P co CCGG 145.830 -999.990 ... R5 2001 06 08 15 07 00 78.9067 11.8883 479.00 474.00 5.00 167188 ZEP 2001 05 24 10 02 00 807-91 P co CCGG 133.520 -999.990 ... R5 2001 06 21 14 35 00 78.9067 11.8883 479.00 474.00 5.00 167189 ZEP 2001 05 24 10 02 00 808-91 P co CCGG 134.240 -999.990 ... R5 2001 06 21 14 48 00 78.9067 11.8883 479.00 474.00 5.00 167190 ZEP 2001 05 31 09 54 00 743-91 P co CCGG 130.060 -999.990 ... R5 2001 06 21 14 09 00 78.9067 11.8883 479.00 474.00 5.00 167191 ZEP 2001 05 31 09 54 00 744-91 P co CCGG 129.960 -999.990 ... R5 2001 06 21 14 22 00 78.9067 11.8883 479.00 474.00 5.00 167192 ZEP 2001 06 07 08 15 00 4001-91 P co CCGG 118.810 -999.990 ... R5 2001 07 05 13 55 00 78.9067 11.8883 479.00 474.00 5.00 167193 ZEP 2001 06 07 08 15 00 4002-91 P co CCGG 119.510 -999.990 ... R5 2001 07 05 14 08 00 78.9067 11.8883 479.00 474.00 5.00 167194 ZEP 2001 06 14 08 18 00 853-91 P co CCGG 115.070 -999.990 ... R5 2001 07 05 12 34 00 78.9067 11.8883 479.00 474.00 5.00 167195 ZEP 2001 06 14 08 18 00 854-91 P co CCGG 114.830 -999.990 ... R5 2001 07 05 12 48 00 78.9067 11.8883 479.00 474.00 5.00 167196 ZEP 2001 06 21 10 20 00 281-99 P co CCGG 110.690 -999.990 ... R5 2001 07 20 15 04 00 78.9067 11.8883 479.00 474.00 5.00 167197 ZEP 2001 06 21 10 20 00 282-99 P co CCGG 110.890 -999.990 ... R5 2001 07 20 15 17 00 78.9067 11.8883 479.00 474.00 5.00 167198 ZEP 2001 06 28 08 33 00 275-99 P co CCGG 95.450 -999.990 ... R5 2001 07 23 11 42 00 78.9067 11.8883 479.00 474.00 5.00 167199 ZEP 2001 06 28 08 33 00 276-99 P co CCGG 94.380 -999.990 ... R5 2001 07 23 11 56 00 78.9067 11.8883 479.00 474.00 5.00 167200 ZEP 2001 07 05 09 08 00 4955-91 P co CCGG 88.480 -999.990 ... R5 2001 08 01 15 22 00 78.9067 11.8883 479.00 474.00 5.00 167201 ZEP 2001 07 05 09 08 00 4956-91 P co CCGG 89.450 -999.990 ... R5 2001 08 01 15 35 00 78.9067 11.8883 479.00 474.00 5.00 167202 ZEP 2001 07 12 09 29 00 1475-91 P co CCGG 82.130 -999.990 ... R5 2001 08 01 14 56 00 78.9067 11.8883 479.00 474.00 5.00 167203 ZEP 2001 07 12 09 29 00 1476-91 P co CCGG 82.400 -999.990 ... R5 2001 08 01 15 09 00 78.9067 11.8883 479.00 474.00 5.00 167204 ZEP 2001 07 19 08 25 00 1603-91 P co CCGG 83.780 -999.990 ... R5 2001 08 15 14 34 00 78.9067 11.8883 479.00 474.00 5.00 167205 ZEP 2001 07 19 08 25 00 1604-91 P co CCGG 83.730 -999.990 ... R5 2001 08 15 14 47 00 78.9067 11.8883 479.00 474.00 5.00 167206 ZEP 2001 07 26 08 25 00 265-99 P co CCGG 80.420 -999.990 ... R5 2001 08 15 13 49 00 78.9067 11.8883 479.00 474.00 5.00 167207 ZEP 2001 07 26 08 25 00 266-99 P co CCGG 80.890 -999.990 ... R5 2001 08 15 14 02 00 78.9067 11.8883 479.00 474.00 5.00 167208 ZEP 2001 08 02 08 38 00 75-98 P co CCGG 77.600 -999.990 ... R5 2001 09 07 13 11 00 78.9067 11.8883 479.00 474.00 5.00 167209 ZEP 2001 08 02 08 38 00 76-98 P co CCGG 77.470 -999.990 ... R5 2001 09 07 13 24 00 78.9067 11.8883 479.00 474.00 5.00 167210 ZEP 2001 08 13 13 06 00 987-91 P co CCGG 85.110 -999.990 ... R5 2001 09 07 13 37 00 78.9067 11.8883 479.00 474.00 5.00 167211 ZEP 2001 08 13 13 06 00 988-91 P co CCGG 84.810 -999.990 ... R5 2001 09 07 13 50 00 78.9067 11.8883 479.00 474.00 5.00 167212 ZEP 2001 08 16 08 16 00 1845-91 P co CCGG 80.520 -999.990 ... R5 2001 10 18 14 44 00 78.9067 11.8883 479.00 474.00 5.00 167213 ZEP 2001 08 16 08 16 00 1846-91 P co CCGG 80.320 -999.990 ... R5 2001 10 18 14 57 00 78.9067 11.8883 479.00 474.00 5.00 167214 ZEP 2001 08 23 08 46 00 4279-91 P co CCGG 94.170 -999.990 ... R5 2001 10 18 15 10 00 78.9067 11.8883 479.00 474.00 5.00 167215 ZEP 2001 08 23 08 46 00 4280-91 P co CCGG 94.180 -999.990 ... R5 2001 10 18 15 23 00 78.9067 11.8883 479.00 474.00 5.00 167216 ZEP 2001 08 30 08 33 00 4475-91 P co CCGG 98.880 -999.990 ... R5 2001 10 18 15 36 00 78.9067 11.8883 479.00 474.00 5.00 167217 ZEP 2001 08 30 08 33 00 4476-91 P co CCGG 98.050 -999.990 ... R5 2001 10 18 15 49 00 78.9067 11.8883 479.00 474.00 5.00 167218 ZEP 2001 09 06 07 43 00 369-91 P co CCGG 100.590 -999.990 ... R5 2001 10 18 16 31 00 78.9067 11.8883 479.00 474.00 5.00 167219 ZEP 2001 09 06 07 43 00 370-91 P co CCGG 99.720 -999.990 ... R5 2001 10 18 16 44 00 78.9067 11.8883 479.00 474.00 5.00 167220 ZEP 2001 09 13 08 55 00 4990-91 P co CCGG 94.730 -999.990 ... R5 2001 10 18 16 02 00 78.9067 11.8883 479.00 474.00 5.00 167221 ZEP 2001 09 14 08 13 00 65-98 P co CCGG 114.650 -999.990 ... R5 2001 10 18 14 06 00 78.9067 11.8883 479.00 474.00 5.00 167222 ZEP 2001 09 14 08 13 00 66-98 P co CCGG 114.250 -999.990 ... R5 2001 10 18 14 19 00 78.9067 11.8883 479.00 474.00 5.00 167223 ZEP 2001 09 29 09 00 00 267-99 P co CCGG 99.840 -999.990 ... R5 2001 10 24 13 49 00 78.9067 11.8883 479.00 474.00 5.00 167224 ZEP 2001 09 29 09 00 00 268-99 P co CCGG 99.420 -999.990 ... R5 2001 10 24 14 02 00 78.9067 11.8883 479.00 474.00 5.00 167225 ZEP 2001 10 04 08 43 00 300-99 P co CCGG 98.180 -999.990 ... R5 2001 10 24 16 20 00 78.9067 11.8883 479.00 474.00 5.00 167226 ZEP 2001 10 11 08 40 00 4083-91 P co CCGG 99.980 -999.990 ... R5 2001 11 27 12 35 00 78.9067 11.8883 479.00 474.00 5.00 167227 ZEP 2001 10 11 08 40 00 4084-91 P co CCGG 102.830 -999.990 ... R5 2001 11 27 12 48 00 78.9067 11.8883 479.00 474.00 5.00 167228 ZEP 2001 10 18 08 35 00 4529-91 P co CCGG 106.000 -999.990 ... R5 2001 11 27 12 09 00 78.9067 11.8883 479.00 474.00 5.00 167229 ZEP 2001 10 18 08 35 00 4530-91 P co CCGG 105.530 -999.990 ... R5 2001 11 27 12 22 00 78.9067 11.8883 479.00 474.00 5.00 167230 ZEP 2001 10 26 14 40 00 157-99 P co CCGG 109.890 -999.990 ... R5 2001 11 27 15 15 00 78.9067 11.8883 479.00 474.00 5.00 167231 ZEP 2001 11 01 09 42 00 251-99 P co CCGG 111.420 -999.990 ... R5 2001 11 27 11 43 00 78.9067 11.8883 479.00 474.00 5.00 167232 ZEP 2001 11 01 09 42 00 252-99 P co CCGG 111.740 -999.990 ... R5 2001 11 27 11 56 00 78.9067 11.8883 479.00 474.00 5.00 167233 ZEP 2001 11 08 09 05 00 4181-91 P co CCGG 117.370 -999.990 ... R5 2001 12 10 11 05 00 78.9067 11.8883 479.00 474.00 5.00 167234 ZEP 2001 11 08 09 05 00 4182-91 P co CCGG 116.510 -999.990 ... R5 2001 12 10 11 19 00 78.9067 11.8883 479.00 474.00 5.00 167235 ZEP 2001 11 15 09 00 00 4187-91 P co CCGG 127.850 -999.990 ... R5 2001 12 10 11 58 00 78.9067 11.8883 479.00 474.00 5.00 167236 ZEP 2001 11 15 09 00 00 4188-91 P co CCGG 128.610 -999.990 ... R5 2001 12 10 12 11 00 78.9067 11.8883 479.00 474.00 5.00 167237 ZEP 2001 11 22 09 50 00 339-91 P co CCGG 127.740 -999.990 ... R5 2002 01 08 15 56 00 78.9067 11.8883 479.00 474.00 5.00 167238 ZEP 2001 11 22 09 50 00 340-91 P co CCGG 128.650 -999.990 ... R5 2002 01 08 16 09 00 78.9067 11.8883 479.00 474.00 5.00 167239 ZEP 2001 11 29 12 34 56 813-91 P co CCGG 143.970 -999.990 ... R5 2002 01 08 16 22 00 78.9067 11.8883 479.00 474.00 5.00 167240 ZEP 2001 11 29 12 34 56 814-91 P co CCGG 144.400 -999.990 ... R5 2002 01 08 16 35 00 78.9067 11.8883 479.00 474.00 5.00 167241 ZEP 2001 12 06 09 35 00 803-91 P co CCGG 127.310 -999.990 ... R5 2002 01 09 10 53 00 78.9067 11.8883 479.00 474.00 5.00 167242 ZEP 2001 12 06 09 35 00 804-91 P co CCGG 126.040 -999.990 ... R5 2002 01 09 11 06 00 78.9067 11.8883 479.00 474.00 5.00 167243 ZEP 2001 12 13 08 35 00 4595-91 P co CCGG 134.460 -999.990 ... R5 2002 01 30 13 59 00 78.9067 11.8883 479.00 474.00 5.00 167244 ZEP 2001 12 13 08 35 00 4596-91 P co CCGG 134.900 -999.990 ... R5 2002 01 30 14 12 00 78.9067 11.8883 479.00 474.00 5.00 167245 ZEP 2001 12 20 09 50 00 4103-91 P co CCGG 157.790 -999.990 ... R5 2002 01 30 17 02 00 78.9067 11.8883 479.00 474.00 5.00 167246 ZEP 2001 12 20 09 50 00 4104-91 P co CCGG 157.650 -999.990 ... R5 2002 01 30 17 15 00 78.9067 11.8883 479.00 474.00 5.00 167247 ZEP 2001 12 27 13 42 00 4703-91 P co CCGG 148.320 -999.990 ... R5 2002 01 24 16 18 00 78.9067 11.8883 479.00 474.00 5.00 167248 ZEP 2001 12 27 13 42 00 4704-91 P co CCGG 147.560 -999.990 ... R5 2002 01 24 16 31 00 78.9067 11.8883 479.00 474.00 5.00 167249 ZEP 2002 01 03 12 34 56 4095-91 P co CCGG 139.010 -999.990 ... R5 2002 01 24 14 58 00 78.9067 11.8883 479.00 474.00 5.00 167250 ZEP 2002 01 03 12 34 56 4096-91 P co CCGG 138.630 -999.990 ... R5 2002 01 24 15 11 00 78.9067 11.8883 479.00 474.00 5.00 167251 ZEP 2002 01 10 10 00 00 659-91 P co CCGG 140.360 -999.990 ... R5 2002 01 31 16 41 00 78.9067 11.8883 479.00 474.00 5.00 167252 ZEP 2002 01 10 10 00 00 660-91 P co CCGG 138.530 -999.990 ... R5 2002 01 31 16 54 00 78.9067 11.8883 479.00 474.00 5.00 167253 ZEP 2002 01 17 09 50 00 1471-91 P co CCGG 157.500 -999.990 ... R5 2002 02 20 15 42 00 78.9067 11.8883 479.00 474.00 5.00 167254 ZEP 2002 01 17 09 50 00 1472-91 P co CCGG 158.000 -999.990 ... R5 2002 02 20 15 55 00 78.9067 11.8883 479.00 474.00 5.00 167255 ZEP 2002 01 25 10 30 00 1093-91 P co CCGG 161.050 -999.990 ... R5 2002 02 20 15 16 00 78.9067 11.8883 479.00 474.00 5.00 167256 ZEP 2002 01 25 10 30 00 1094-91 P co CCGG 161.760 -999.990 ... R5 2002 02 20 15 29 00 78.9067 11.8883 479.00 474.00 5.00 167257 ZEP 2002 01 31 09 50 00 4025-91 P co CCGG 160.090 -999.990 ... R5 2002 03 13 14 32 00 78.9067 11.8883 479.00 474.00 5.00 167258 ZEP 2002 01 31 09 50 00 4026-91 P co CCGG 160.300 -999.990 ... R5 2002 03 13 14 45 00 78.9067 11.8883 479.00 474.00 5.00 167259 ZEP 2002 02 07 09 34 00 1789-91 P co CCGG 166.060 -999.990 ... R5 2002 03 13 14 58 00 78.9067 11.8883 479.00 474.00 5.00 167260 ZEP 2002 02 07 09 34 00 1790-91 P co CCGG 166.190 -999.990 ... R5 2002 03 13 15 12 00 78.9067 11.8883 479.00 474.00 5.00 167261 ZEP 2002 02 15 09 02 00 1841-91 P co CCGG 158.480 -999.990 ... R5 2002 03 14 11 06 00 78.9067 11.8883 479.00 474.00 5.00 167262 ZEP 2002 02 15 09 02 00 1842-91 P co CCGG 156.450 -999.990 ... R5 2002 03 14 11 19 00 78.9067 11.8883 479.00 474.00 5.00 167263 ZEP 2002 02 21 09 04 00 4084-91 P co CCGG 168.690 -999.990 ... R5 2002 03 18 15 58 00 78.9067 11.8883 479.00 474.00 5.00 167264 ZEP 2002 02 21 09 54 00 853-91 P co CCGG 168.380 -999.990 ... R5 2002 03 25 15 39 00 78.9067 11.8883 479.00 474.00 5.00 167265 ZEP 2002 02 21 09 54 00 854-91 P co CCGG 167.100 -999.990 ... R5 2002 03 25 15 52 00 78.9067 11.8883 479.00 474.00 5.00 167266 ZEP 2002 02 28 12 34 56 1405-91 P co CCGG 164.290 -999.990 ... R5 2002 03 25 16 05 00 78.9067 11.8883 479.00 474.00 5.00 167267 ZEP 2002 02 28 12 34 56 1406-91 P co CCGG 164.460 -999.990 ... R5 2002 03 25 16 18 00 78.9067 11.8883 479.00 474.00 5.00 167268 ZEP 2002 03 10 11 30 00 161-99 P co CCGG 169.270 -999.990 ... R5 2002 04 23 12 45 00 78.9067 11.8883 479.00 474.00 5.00 167269 ZEP 2002 03 10 11 30 00 162-99 P co CCGG 170.710 -999.990 ... R5 2002 04 23 12 58 00 78.9067 11.8883 479.00 474.00 5.00 167270 ZEP 2002 03 15 10 25 00 181-99 P co CCGG -999.990 -999.990 *.. R5 2002 04 22 15 52 00 78.9067 11.8883 479.00 474.00 5.00 167271 ZEP 2002 03 15 10 25 00 182-99 P co CCGG 166.450 -999.990 ... R5 2002 04 22 16 06 00 78.9067 11.8883 479.00 474.00 5.00 167272 ZEP 2002 03 18 09 20 00 4709-91 P co CCGG 258.560 -999.990 P.C R5 2002 07 08 08 50 00 78.9067 11.8883 479.00 474.00 5.00 167273 ZEP 2002 03 18 09 20 00 4710-91 P co CCGG 150.460 -999.990 P.. R5 2002 07 08 09 03 00 78.9067 11.8883 479.00 474.00 5.00 167274 ZEP 2002 03 22 09 26 00 339-99 P co CCGG 157.740 -999.990 ... R5 2002 04 23 11 53 00 78.9067 11.8883 479.00 474.00 5.00 167275 ZEP 2002 03 22 09 26 00 340-99 P co CCGG 156.500 -999.990 ... R5 2002 04 23 12 06 00 78.9067 11.8883 479.00 474.00 5.00 167276 ZEP 2002 03 29 10 40 00 4835-98 P co CCGG 165.650 -999.990 ... R5 2002 04 23 12 19 00 78.9067 11.8883 479.00 474.00 5.00 167277 ZEP 2002 03 29 10 40 00 4836-98 P co CCGG 165.770 -999.990 ... R5 2002 04 23 12 32 00 78.9067 11.8883 479.00 474.00 5.00 167278 ZEP 2002 04 05 09 05 00 743-91 P co CCGG 164.940 -999.990 ... R5 2002 05 24 11 17 00 78.9067 11.8883 479.00 474.00 5.00 167279 ZEP 2002 04 05 09 05 00 744-91 P co CCGG 165.200 -999.990 ... R5 2002 05 24 11 30 00 78.9067 11.8883 479.00 474.00 5.00 167280 ZEP 2002 04 11 08 11 00 793-91 P co CCGG 161.970 -999.990 ... R5 2002 05 24 10 49 00 78.9067 11.8883 479.00 474.00 5.00 167281 ZEP 2002 04 11 08 11 00 794-91 P co CCGG 160.860 -999.990 ... R5 2002 05 24 11 02 00 78.9067 11.8883 479.00 474.00 5.00 167282 ZEP 2002 04 25 08 08 00 75-98 P co CCGG 155.310 -999.990 ... R5 2002 06 06 16 04 00 78.9067 11.8883 479.00 474.00 5.00 167283 ZEP 2002 04 25 08 08 00 76-98 P co CCGG 154.550 -999.990 ... R5 2002 06 06 16 17 00 78.9067 11.8883 479.00 474.00 5.00 167284 ZEP 2002 05 03 08 56 00 1123-91 P co CCGG 15.840 -999.990 P.C R5 2002 06 06 16 30 00 78.9067 11.8883 479.00 474.00 5.00 167285 ZEP 2002 05 03 08 56 00 1124-91 P co CCGG 335.890 -999.990 P.C R5 2002 06 06 16 43 00 78.9067 11.8883 479.00 474.00 5.00 167286 ZEP 2002 05 10 08 52 00 359-91 P co CCGG 141.540 -999.990 ... R5 2002 06 06 16 56 00 78.9067 11.8883 479.00 474.00 5.00 167287 ZEP 2002 05 10 08 52 00 360-91 P co CCGG 142.190 -999.990 ... R5 2002 06 06 17 09 00 78.9067 11.8883 479.00 474.00 5.00 167288 ZEP 2002 05 17 08 03 00 1055-91 P co CCGG 131.200 -999.990 ... R5 2002 06 06 15 38 00 78.9067 11.8883 479.00 474.00 5.00 167289 ZEP 2002 05 17 08 03 00 1056-91 P co CCGG 132.960 -999.990 ... R5 2002 06 06 15 51 00 78.9067 11.8883 479.00 474.00 5.00 167290 ZEP 2002 05 23 08 34 00 1967-91 P co CCGG 126.450 -999.990 ... R5 2002 07 08 09 16 00 78.9067 11.8883 479.00 474.00 5.00 167291 ZEP 2002 05 23 08 34 00 1968-91 P co CCGG 127.370 -999.990 ... R5 2002 07 08 09 29 00 78.9067 11.8883 479.00 474.00 5.00 167292 ZEP 2002 05 30 08 04 00 4893-91 P co CCGG 124.540 -999.990 ... R5 2002 10 28 14 52 00 78.9067 11.8883 479.00 474.00 5.00 167293 ZEP 2002 05 30 08 04 00 4894-91 P co CCGG 122.790 -999.990 ... R5 2002 10 28 15 05 00 78.9067 11.8883 479.00 474.00 5.00 167294 ZEP 2002 06 06 08 25 00 35-91 P co CCGG 109.030 -999.990 ... R5 2002 10 28 13 34 00 78.9067 11.8883 479.00 474.00 5.00 167295 ZEP 2002 06 06 08 25 00 36-91 P co CCGG 106.450 -999.990 ... R5 2002 10 28 13 47 00 78.9067 11.8883 479.00 474.00 5.00 167296 ZEP 2002 06 13 08 12 00 4887-91 P co CCGG 99.650 -999.990 ... R5 2002 07 22 11 04 00 78.9067 11.8883 479.00 474.00 5.00 167297 ZEP 2002 06 13 08 12 00 4888-91 P co CCGG 100.430 -999.990 ... R5 2002 07 22 11 17 00 78.9067 11.8883 479.00 474.00 5.00 167298 ZEP 2002 06 22 13 30 00 513-91 P co CCGG 89.700 -999.990 ... R5 2002 07 22 10 36 00 78.9067 11.8883 479.00 474.00 5.00 167299 ZEP 2002 06 22 13 30 00 514-91 P co CCGG 89.060 -999.990 ... R5 2002 07 22 10 49 00 78.9067 11.8883 479.00 474.00 5.00 167300 ZEP 2002 06 27 08 33 00 803-91 P co CCGG 90.800 -999.990 ... R5 2002 07 24 16 28 00 78.9067 11.8883 479.00 474.00 5.00 167301 ZEP 2002 06 27 08 33 00 804-91 P co CCGG 90.760 -999.990 ... R5 2002 07 24 16 41 00 78.9067 11.8883 479.00 474.00 5.00 167302 ZEP 2002 07 04 08 14 00 813-91 P co CCGG 91.850 -999.990 ... R5 2002 07 24 15 36 00 78.9067 11.8883 479.00 474.00 5.00 167303 ZEP 2002 07 04 08 14 00 814-91 P co CCGG 90.500 -999.990 ... R5 2002 07 24 15 49 00 78.9067 11.8883 479.00 474.00 5.00 167304 ZEP 2002 07 11 03 46 00 65-98 P co CCGG 90.200 -999.990 P.. R5 2002 08 12 09 26 00 78.9067 11.8883 479.00 474.00 5.00 167305 ZEP 2002 07 11 03 46 00 66-98 P co CCGG 86.340 -999.990 P.. R5 2002 08 12 09 39 00 78.9067 11.8883 479.00 474.00 5.00 167306 ZEP 2002 07 18 07 32 00 1215-91 P co CCGG 95.210 -999.990 ... R5 2002 08 12 10 18 00 78.9067 11.8883 479.00 474.00 5.00 167307 ZEP 2002 07 18 07 32 00 1216-91 P co CCGG 95.090 -999.990 ... R5 2002 08 12 10 31 00 78.9067 11.8883 479.00 474.00 5.00 167308 ZEP 2002 07 25 07 45 00 295-99 P co CCGG 86.370 -999.990 ... R5 2002 08 26 15 47 00 78.9067 11.8883 479.00 474.00 5.00 167309 ZEP 2002 07 25 07 45 00 296-99 P co CCGG 86.810 -999.990 ... R5 2002 08 26 16 00 00 78.9067 11.8883 479.00 474.00 5.00 167310 ZEP 2002 08 08 09 42 00 531-99 P co CCGG 97.720 -999.990 ... R5 2002 08 26 14 53 00 78.9067 11.8883 479.00 474.00 5.00 167311 ZEP 2002 08 08 09 42 00 532-99 P co CCGG 97.360 -999.990 ... R5 2002 08 26 15 06 00 78.9067 11.8883 479.00 474.00 5.00 167312 ZEP 2002 08 15 08 11 00 113-99 P co CCGG 115.750 -999.990 ... R5 2002 09 19 12 09 00 78.9067 11.8883 479.00 474.00 5.00 167313 ZEP 2002 08 15 08 11 00 114-99 P co CCGG 115.830 -999.990 ... R5 2002 09 19 12 22 00 78.9067 11.8883 479.00 474.00 5.00 167314 ZEP 2002 08 22 07 28 00 261-99 P co CCGG 95.840 -999.990 ... R5 2002 09 19 13 28 00 78.9067 11.8883 479.00 474.00 5.00 167315 ZEP 2002 08 22 07 28 00 262-99 P co CCGG 95.650 -999.990 ... R5 2002 09 19 13 41 00 78.9067 11.8883 479.00 474.00 5.00 167316 ZEP 2002 08 29 08 07 00 447-99 P co CCGG 102.080 -999.990 ... R5 2002 10 03 16 13 00 78.9067 11.8883 479.00 474.00 5.00 167317 ZEP 2002 08 29 08 07 00 448-99 P co CCGG 99.370 -999.990 ... R5 2002 10 03 16 26 00 78.9067 11.8883 479.00 474.00 5.00 167318 ZEP 2002 09 06 08 30 00 645-99 P co CCGG 117.420 -999.990 ... R5 2002 10 03 16 40 00 78.9067 11.8883 479.00 474.00 5.00 167319 ZEP 2002 09 06 08 30 00 646-99 P co CCGG 117.430 -999.990 ... R5 2002 10 03 16 53 00 78.9067 11.8883 479.00 474.00 5.00 167320 ZEP 2002 09 12 08 17 00 647-99 P co CCGG 131.380 -999.990 ... R5 2002 12 09 10 03 00 78.9067 11.8883 479.00 474.00 5.00 167321 ZEP 2002 09 12 08 17 00 648-99 P co CCGG 131.310 -999.990 ... R5 2002 12 09 10 16 00 78.9067 11.8883 479.00 474.00 5.00 167322 ZEP 2002 09 19 08 30 00 650-99 P co CCGG 133.200 -999.990 ... R5 2002 12 09 12 02 00 78.9067 11.8883 479.00 474.00 5.00 167323 ZEP 2002 09 26 07 32 00 4029-91 P co CCGG 130.030 -999.990 ... R5 2002 10 25 14 00 00 78.9067 11.8883 479.00 474.00 5.00 167324 ZEP 2002 09 26 07 32 00 4030-91 P co CCGG 130.500 -999.990 ... R5 2002 10 25 14 13 00 78.9067 11.8883 479.00 474.00 5.00 167325 ZEP 2002 10 03 08 30 00 4507-91 P co CCGG 134.460 -999.990 ... R5 2002 10 25 13 34 00 78.9067 11.8883 479.00 474.00 5.00 167326 ZEP 2002 10 03 08 30 00 4508-91 P co CCGG 135.930 -999.990 ... R5 2002 10 25 13 47 00 78.9067 11.8883 479.00 474.00 5.00 167327 ZEP 2002 10 10 08 44 00 1992-91 P co CCGG 135.800 -999.990 ... R5 2002 10 29 16 24 00 78.9067 11.8883 479.00 474.00 5.00 167328 ZEP 2002 10 10 08 59 00 4657-91 P co CCGG 135.140 -999.990 ... R5 2002 10 30 10 55 00 78.9067 11.8883 479.00 474.00 5.00 167329 ZEP 2002 10 10 08 59 00 4658-91 P co CCGG 135.440 -999.990 ... R5 2002 10 30 11 08 00 78.9067 11.8883 479.00 474.00 5.00 167330 ZEP 2002 12 05 08 45 00 4071-91 P co CCGG 189.260 -999.990 ... R5 2003 01 29 16 22 00 78.9067 11.8883 479.00 474.00 5.00 167331 ZEP 2002 12 05 08 45 00 4072-91 P co CCGG 189.160 -999.990 ... R5 2003 01 29 16 35 00 78.9067 11.8883 479.00 474.00 5.00 167332 ZEP 2002 12 19 08 30 00 743-91 P co CCGG 183.870 -999.990 ... R5 2003 02 03 09 58 00 78.9067 11.8883 479.00 474.00 5.00 167333 ZEP 2002 12 19 08 30 00 744-91 P co CCGG 184.200 -999.990 ... R5 2003 02 03 10 11 00 78.9067 11.8883 479.00 474.00 5.00 167334 ZEP 2002 12 26 10 36 00 719-91 P co CCGG 150.150 -999.990 .X. R5 2003 02 07 10 56 00 78.9067 11.8883 479.00 474.00 5.00 167335 ZEP 2002 12 26 10 36 00 720-91 P co CCGG 151.950 -999.990 .X. R5 2003 02 07 11 09 00 78.9067 11.8883 479.00 474.00 5.00 167336 ZEP 2003 01 02 08 30 00 4845-91 P co CCGG 151.070 -999.990 .X. R5 2003 02 07 12 16 00 78.9067 11.8883 479.00 474.00 5.00 167337 ZEP 2003 01 02 08 30 00 4846-91 P co CCGG 150.610 -999.990 .X. R5 2003 02 07 12 29 00 78.9067 11.8883 479.00 474.00 5.00 167338 ZEP 2003 01 09 07 36 00 693-99 P co CCGG 176.850 -999.990 ... R5 2003 02 06 16 50 00 78.9067 11.8883 479.00 474.00 5.00 167339 ZEP 2003 01 09 07 36 00 694-99 P co CCGG 174.050 -999.990 ... R5 2003 02 06 17 03 00 78.9067 11.8883 479.00 474.00 5.00 167340 ZEP 2003 01 16 07 55 00 6217-66 P co CCGG 176.810 -999.990 ... R5 2003 03 21 10 39 00 78.9067 11.8883 479.00 474.00 5.00 167341 ZEP 2003 01 16 07 55 00 6218-66 P co CCGG 174.910 -999.990 ... R5 2003 03 21 10 52 00 78.9067 11.8883 479.00 474.00 5.00 167342 ZEP 2003 01 23 10 00 00 6261-66 P co CCGG 174.710 -999.990 ... R5 2003 03 21 14 01 00 78.9067 11.8883 479.00 474.00 5.00 167343 ZEP 2003 01 23 10 00 00 6262-66 P co CCGG 174.100 -999.990 ... R5 2003 03 21 14 14 00 78.9067 11.8883 479.00 474.00 5.00 167344 ZEP 2003 01 30 08 15 00 149-91 P co CCGG 191.770 -999.990 ... R5 2003 05 08 08 59 00 78.9067 11.8883 479.00 474.00 5.00 167345 ZEP 2003 01 30 08 15 00 150-91 P co CCGG 193.260 -999.990 ... R5 2003 05 08 09 12 00 78.9067 11.8883 479.00 474.00 5.00 167346 ZEP 2003 02 06 09 23 00 1997-91 P co CCGG 174.410 -999.990 ... R5 2003 05 08 09 25 00 78.9067 11.8883 479.00 474.00 5.00 167347 ZEP 2003 02 06 09 23 00 1998-91 P co CCGG 175.070 -999.990 ... R5 2003 05 08 09 38 00 78.9067 11.8883 479.00 474.00 5.00 167348 ZEP 2003 02 13 09 22 00 375-99 P co CCGG 173.440 -999.990 ... R5 2003 03 25 17 22 00 78.9067 11.8883 479.00 474.00 5.00 167349 ZEP 2003 02 27 07 58 00 485-91 P co CCGG 179.740 -999.990 ... R5 2003 04 03 11 06 00 78.9067 11.8883 479.00 474.00 5.00 167350 ZEP 2003 02 27 07 58 00 486-91 P co CCGG 180.090 -999.990 ... R5 2003 04 03 11 19 00 78.9067 11.8883 479.00 474.00 5.00 167351 ZEP 2003 03 13 13 55 00 219-99 P co CCGG 182.810 -999.990 ... R5 2003 04 03 10 40 00 78.9067 11.8883 479.00 474.00 5.00 167352 ZEP 2003 03 13 13 55 00 220-99 P co CCGG 183.990 -999.990 ... R5 2003 04 03 10 53 00 78.9067 11.8883 479.00 474.00 5.00 167353 ZEP 2003 03 20 08 27 00 1127-91 P co CCGG 192.050 -999.990 ... R5 2003 05 09 13 22 00 78.9067 11.8883 479.00 474.00 5.00 167354 ZEP 2003 03 20 08 27 00 1128-91 P co CCGG 191.790 -999.990 ... R5 2003 05 09 13 35 00 78.9067 11.8883 479.00 474.00 5.00 167355 ZEP 2003 03 27 09 36 00 1029-91 P co CCGG 179.090 -999.990 ... R5 2003 05 09 12 56 00 78.9067 11.8883 479.00 474.00 5.00 167356 ZEP 2003 03 27 09 36 00 1030-91 P co CCGG 180.480 -999.990 ... R5 2003 05 09 13 09 00 78.9067 11.8883 479.00 474.00 5.00 167357 ZEP 2003 04 03 08 30 00 1051-99 P co CCGG 184.330 -999.990 ... R5 2003 05 21 11 46 00 78.9067 11.8883 479.00 474.00 5.00 167358 ZEP 2003 04 03 08 30 00 1052-99 P co CCGG 182.150 -999.990 ... R5 2003 05 21 12 00 00 78.9067 11.8883 479.00 474.00 5.00 167359 ZEP 2003 04 07 17 21 00 4781-91 P co CCGG 152.010 -999.990 P.. R5 2003 05 21 11 20 00 78.9067 11.8883 479.00 474.00 5.00 167360 ZEP 2003 04 07 17 21 00 4782-91 P co CCGG 162.040 -999.990 P.. R5 2003 05 21 11 33 00 78.9067 11.8883 479.00 474.00 5.00 167361 ZEP 2003 04 08 07 00 00 105-91 P co CCGG 163.770 -999.990 ... R5 2003 05 14 10 51 00 78.9067 11.8883 479.00 474.00 5.00 167362 ZEP 2003 04 08 07 00 00 106-91 P co CCGG 161.570 -999.990 ... R5 2003 05 14 11 04 00 78.9067 11.8883 479.00 474.00 5.00 167363 ZEP 2003 04 09 11 24 00 6195-66 P co CCGG 172.140 -999.990 ... R5 2003 05 14 11 43 00 78.9067 11.8883 479.00 474.00 5.00 167364 ZEP 2003 04 09 11 24 00 6196-66 P co CCGG 171.850 -999.990 ... R5 2003 05 14 11 56 00 78.9067 11.8883 479.00 474.00 5.00 167365 ZEP 2003 04 10 07 08 00 435-99 P co CCGG 167.990 -999.990 ... R5 2003 05 09 14 27 00 78.9067 11.8883 479.00 474.00 5.00 167366 ZEP 2003 04 10 07 08 00 436-99 P co CCGG 167.920 -999.990 ... R5 2003 05 09 14 40 00 78.9067 11.8883 479.00 474.00 5.00 167367 ZEP 2003 04 11 08 01 00 1373-91 P co CCGG 167.330 -999.990 ... R5 2003 05 09 13 48 00 78.9067 11.8883 479.00 474.00 5.00 167368 ZEP 2003 04 11 08 01 00 1374-91 P co CCGG 167.020 -999.990 ... R5 2003 05 09 14 01 00 78.9067 11.8883 479.00 474.00 5.00 167369 ZEP 2003 04 12 12 02 00 487-99 P co CCGG 166.840 -999.990 ... R5 2003 05 21 12 40 00 78.9067 11.8883 479.00 474.00 5.00 167370 ZEP 2003 04 12 12 02 00 488-99 P co CCGG 166.070 -999.990 ... R5 2003 05 21 12 53 00 78.9067 11.8883 479.00 474.00 5.00 167371 ZEP 2003 04 13 09 43 00 1129-91 P co CCGG 193.650 -999.990 ... R5 2003 05 21 13 07 00 78.9067 11.8883 479.00 474.00 5.00 167372 ZEP 2003 04 13 09 43 00 1130-91 P co CCGG 193.380 -999.990 ... R5 2003 05 21 13 20 00 78.9067 11.8883 479.00 474.00 5.00 167373 ZEP 2003 04 14 13 01 00 257-91 P co CCGG 188.000 -999.990 ... R5 2003 05 14 13 03 00 78.9067 11.8883 479.00 474.00 5.00 167374 ZEP 2003 04 14 13 01 00 258-91 P co CCGG 189.550 -999.990 ... R5 2003 05 14 13 16 00 78.9067 11.8883 479.00 474.00 5.00 167375 ZEP 2003 04 15 06 41 00 4933-91 P co CCGG 161.240 -999.990 ... R5 2003 05 14 12 37 00 78.9067 11.8883 479.00 474.00 5.00 167376 ZEP 2003 04 15 06 41 00 4934-91 P co CCGG 161.140 -999.990 ... R5 2003 05 14 12 50 00 78.9067 11.8883 479.00 474.00 5.00 167377 ZEP 2003 04 17 06 58 00 4093-91 P co CCGG 175.290 -999.990 ... R5 2003 05 28 11 18 00 78.9067 11.8883 479.00 474.00 5.00 167378 ZEP 2003 04 17 06 58 00 4094-91 P co CCGG 174.110 -999.990 ... R5 2003 05 28 11 31 00 78.9067 11.8883 479.00 474.00 5.00 167379 ZEP 2003 04 24 07 40 00 1567-91 P co CCGG 169.440 -999.990 ... R5 2003 05 28 10 52 00 78.9067 11.8883 479.00 474.00 5.00 167380 ZEP 2003 04 24 07 40 00 1568-91 P co CCGG 170.390 -999.990 ... R5 2003 05 28 11 05 00 78.9067 11.8883 479.00 474.00 5.00 167381 ZEP 2003 05 01 10 00 00 2005-91 P co CCGG 165.560 -999.990 ... R5 2003 06 11 10 06 00 78.9067 11.8883 479.00 474.00 5.00 167382 ZEP 2003 05 01 10 00 00 2006-91 P co CCGG 166.590 -999.990 ... R5 2003 06 11 10 19 00 78.9067 11.8883 479.00 474.00 5.00 167383 ZEP 2003 05 08 07 40 00 911-99 P co CCGG 166.400 -999.990 ... R5 2003 06 11 10 35 00 78.9067 11.8883 479.00 474.00 5.00 167384 ZEP 2003 05 08 07 40 00 912-99 P co CCGG 166.580 -999.990 ... R5 2003 06 11 10 48 00 78.9067 11.8883 479.00 474.00 5.00 167385 ZEP 2003 05 15 08 55 00 4840-98 P co CCGG 158.060 -999.990 ... R5 2003 08 15 16 11 00 78.9067 11.8883 479.00 474.00 5.00 167386 ZEP 2003 05 22 07 00 00 987-91 P co CCGG 153.370 -999.990 ... R5 2003 08 15 16 24 00 78.9067 11.8883 479.00 474.00 5.00 167387 ZEP 2003 05 22 07 20 00 1002-99 P co CCGG 146.200 -999.990 ... R5 2003 06 11 09 27 00 78.9067 11.8883 479.00 474.00 5.00 167388 ZEP 2003 05 22 07 20 00 1495-91 P co CCGG 146.380 -999.990 ... R5 2003 06 11 09 14 00 78.9067 11.8883 479.00 474.00 5.00 167389 ZEP 2003 05 27 07 57 00 1747-91 P co CCGG 142.170 -999.990 ... R5 2003 06 25 14 28 00 78.9067 11.8883 479.00 474.00 5.00 167390 ZEP 2003 05 27 07 57 00 1748-91 P co CCGG 143.010 -999.990 ... R5 2003 06 25 14 41 00 78.9067 11.8883 479.00 474.00 5.00 167391 ZEP 2003 05 29 10 35 00 1093-91 P co CCGG 139.910 -999.990 ... R5 2003 06 25 14 54 00 78.9067 11.8883 479.00 474.00 5.00 167392 ZEP 2003 05 29 10 35 00 1094-91 P co CCGG 138.940 -999.990 ... R5 2003 06 25 15 07 00 78.9067 11.8883 479.00 474.00 5.00 167393 ZEP 2003 06 05 06 35 00 1925-91 P co CCGG 136.800 -999.990 ... R5 2003 07 08 10 52 00 78.9067 11.8883 479.00 474.00 5.00 167394 ZEP 2003 06 05 06 35 00 1926-91 P co CCGG 136.840 -999.990 ... R5 2003 07 08 11 05 00 78.9067 11.8883 479.00 474.00 5.00 167395 ZEP 2003 06 12 10 20 00 1435-91 P co CCGG 145.620 -999.990 ... R5 2003 07 08 10 26 00 78.9067 11.8883 479.00 474.00 5.00 167396 ZEP 2003 06 12 10 20 00 1436-91 P co CCGG 146.760 -999.990 ... R5 2003 07 08 10 39 00 78.9067 11.8883 479.00 474.00 5.00 167397 ZEP 2003 06 19 07 50 00 335-99 P co CCGG 123.590 -999.990 ... R5 2003 07 16 13 51 00 78.9067 11.8883 479.00 474.00 5.00 167398 ZEP 2003 06 19 07 50 00 336-99 P co CCGG 124.200 -999.990 ... R5 2003 07 16 14 04 00 78.9067 11.8883 479.00 474.00 5.00 167399 ZEP 2003 06 26 07 58 00 401-99 P co CCGG 118.200 -999.990 ... R5 2003 07 16 14 17 00 78.9067 11.8883 479.00 474.00 5.00 167400 ZEP 2003 06 26 07 58 00 402-99 P co CCGG 118.610 -999.990 ... R5 2003 07 16 14 30 00 78.9067 11.8883 479.00 474.00 5.00 167401 ZEP 2003 07 03 07 12 00 813-91 P co CCGG 113.200 -999.990 ... R5 2003 08 04 14 17 00 78.9067 11.8883 479.00 474.00 5.00 167402 ZEP 2003 07 11 07 59 00 803-91 P co CCGG 109.760 -999.990 ... R5 2003 08 01 14 25 00 78.9067 11.8883 479.00 474.00 5.00 167403 ZEP 2003 07 11 07 59 00 804-91 P co CCGG 109.320 -999.990 ... R5 2003 08 01 14 38 00 78.9067 11.8883 479.00 474.00 5.00 167404 ZEP 2003 07 17 07 30 00 4789-91 P co CCGG 108.030 -999.990 ... R5 2003 08 15 11 35 00 78.9067 11.8883 479.00 474.00 5.00 167405 ZEP 2003 07 17 07 30 00 4790-91 P co CCGG 106.990 -999.990 ... R5 2003 08 15 11 49 00 78.9067 11.8883 479.00 474.00 5.00 167406 ZEP 2003 07 24 08 06 00 97-91 P co CCGG 101.570 -999.990 ... R5 2003 08 15 12 02 00 78.9067 11.8883 479.00 474.00 5.00 167407 ZEP 2003 07 24 08 06 00 98-91 P co CCGG 99.950 -999.990 ... R5 2003 08 15 12 15 00 78.9067 11.8883 479.00 474.00 5.00 167408 ZEP 2003 07 31 07 58 00 45-98 P co CCGG 110.130 -999.990 ... R5 2003 10 06 10 09 00 78.9067 11.8883 479.00 474.00 5.00 167409 ZEP 2003 07 31 07 58 00 46-98 P co CCGG 109.420 -999.990 ... R5 2003 10 06 10 22 00 78.9067 11.8883 479.00 474.00 5.00 167410 ZEP 2003 08 07 07 16 00 189-99 P co CCGG 106.960 -999.990 ... R5 2003 10 06 12 23 00 78.9067 11.8883 479.00 474.00 5.00 167411 ZEP 2003 08 07 07 16 00 190-99 P co CCGG 106.310 -999.990 ... R5 2003 10 06 12 36 00 78.9067 11.8883 479.00 474.00 5.00 167412 ZEP 2003 08 14 08 25 00 2051-91 P co CCGG 118.310 -999.990 ... R5 2003 10 01 18 36 00 78.9067 11.8883 479.00 474.00 5.00 167413 ZEP 2003 08 14 08 25 00 2052-91 P co CCGG 117.570 -999.990 ... R5 2003 10 01 18 50 00 78.9067 11.8883 479.00 474.00 5.00 167414 ZEP 2003 08 21 07 55 00 4413-91 P co CCGG 121.190 -999.990 ... R5 2003 10 01 19 03 00 78.9067 11.8883 479.00 474.00 5.00 167415 ZEP 2003 08 21 07 55 00 4414-91 P co CCGG 119.920 -999.990 ... R5 2003 10 01 19 16 00 78.9067 11.8883 479.00 474.00 5.00 167416 ZEP 2003 08 28 13 36 00 987-99 P co CCGG 114.990 -999.990 ... R5 2003 10 01 11 56 00 78.9067 11.8883 479.00 474.00 5.00 167417 ZEP 2003 08 28 13 36 00 988-99 P co CCGG 114.740 -999.990 ... R5 2003 10 01 12 09 00 78.9067 11.8883 479.00 474.00 5.00 167418 ZEP 2003 09 04 07 36 00 651-99 P co CCGG 121.650 -999.990 ... R5 2003 10 01 13 16 00 78.9067 11.8883 479.00 474.00 5.00 167419 ZEP 2003 09 04 07 36 00 652-99 P co CCGG 121.690 -999.990 ... R5 2003 10 01 13 30 00 78.9067 11.8883 479.00 474.00 5.00 167420 ZEP 2003 09 11 07 39 00 6605-66 P co CCGG 125.180 -999.990 ... R5 2003 10 07 13 12 00 78.9067 11.8883 479.00 474.00 5.00 167421 ZEP 2003 09 11 07 39 00 6606-66 P co CCGG 124.670 -999.990 ... R5 2003 10 07 13 25 00 78.9067 11.8883 479.00 474.00 5.00 167422 ZEP 2003 09 18 07 24 00 6527-66 P co CCGG 126.930 -999.990 ... R5 2003 10 07 11 54 00 78.9067 11.8883 479.00 474.00 5.00 167423 ZEP 2003 09 18 07 24 00 6528-66 P co CCGG 126.480 -999.990 ... R5 2003 10 07 12 07 00 78.9067 11.8883 479.00 474.00 5.00 167424 ZEP 2003 09 25 07 57 00 1857-99 P co CCGG 151.090 -999.990 .X. R5 2003 10 30 11 48 00 78.9067 11.8883 479.00 474.00 5.00 167425 ZEP 2003 09 25 07 57 00 1858-99 P co CCGG 152.670 -999.990 .X. R5 2003 10 30 12 01 00 78.9067 11.8883 479.00 474.00 5.00 167426 ZEP 2003 09 26 11 47 00 1835-99 P co CCGG 135.260 -999.990 ... R5 2003 10 30 12 14 00 78.9067 11.8883 479.00 474.00 5.00 167427 ZEP 2003 09 26 11 47 00 1836-99 P co CCGG 133.940 -999.990 ... R5 2003 10 30 12 27 00 78.9067 11.8883 479.00 474.00 5.00 167428 ZEP 2003 09 27 11 58 00 743-91 P co CCGG 133.870 -999.990 ... R5 2003 11 11 10 19 00 78.9067 11.8883 479.00 474.00 5.00 167429 ZEP 2003 09 27 11 58 00 744-91 P co CCGG 133.420 -999.990 ... R5 2003 11 11 10 32 00 78.9067 11.8883 479.00 474.00 5.00 167430 ZEP 2003 09 28 15 06 00 4411-91 P co CCGG 133.610 -999.990 ... R5 2003 11 11 09 53 00 78.9067 11.8883 479.00 474.00 5.00 167431 ZEP 2003 09 28 15 06 00 4412-91 P co CCGG 133.260 -999.990 ... R5 2003 11 11 10 06 00 78.9067 11.8883 479.00 474.00 5.00 167432 ZEP 2003 09 29 12 38 00 1005-91 P co CCGG 136.270 -999.990 ... R5 2003 11 11 10 47 00 78.9067 11.8883 479.00 474.00 5.00 167433 ZEP 2003 09 29 12 38 00 1006-91 P co CCGG 135.370 -999.990 ... R5 2003 11 11 11 00 00 78.9067 11.8883 479.00 474.00 5.00 167434 ZEP 2003 09 30 07 05 00 603-91 P co CCGG 137.620 -999.990 ... R5 2003 11 11 09 27 00 78.9067 11.8883 479.00 474.00 5.00 167435 ZEP 2003 09 30 07 05 00 604-91 P co CCGG 137.360 -999.990 ... R5 2003 11 11 09 40 00 78.9067 11.8883 479.00 474.00 5.00 167436 ZEP 2003 10 01 08 53 00 1613-99 P co CCGG 134.720 -999.990 ... R5 2003 10 31 16 12 00 78.9067 11.8883 479.00 474.00 5.00 167437 ZEP 2003 10 01 08 53 00 1614-99 P co CCGG 134.850 -999.990 ... R5 2003 10 31 16 25 00 78.9067 11.8883 479.00 474.00 5.00 167438 ZEP 2003 10 02 07 14 00 1611-99 P co CCGG 135.810 -999.990 ... R5 2003 11 03 10 01 00 78.9067 11.8883 479.00 474.00 5.00 167439 ZEP 2003 10 02 07 14 00 1612-99 P co CCGG 134.720 -999.990 ... R5 2003 11 03 10 14 00 78.9067 11.8883 479.00 474.00 5.00 167440 ZEP 2003 10 09 07 59 00 451-91 P co CCGG 131.200 -999.990 ... R5 2003 11 06 13 05 00 78.9067 11.8883 479.00 474.00 5.00 167441 ZEP 2003 10 09 07 59 00 452-91 P co CCGG 129.950 -999.990 ... R5 2003 11 06 13 18 00 78.9067 11.8883 479.00 474.00 5.00 167442 ZEP 2003 10 16 07 02 00 4753-91 P co CCGG 131.890 -999.990 ... R5 2003 11 06 13 31 00 78.9067 11.8883 479.00 474.00 5.00 167443 ZEP 2003 10 16 07 02 00 4754-91 P co CCGG 132.120 -999.990 ... R5 2003 11 06 13 44 00 78.9067 11.8883 479.00 474.00 5.00 167444 ZEP 2003 10 23 08 11 00 495-91 P co CCGG 125.930 -999.990 ... R5 2003 11 26 10 58 00 78.9067 11.8883 479.00 474.00 5.00 167445 ZEP 2003 10 23 08 11 00 496-91 P co CCGG 125.050 -999.990 ... R5 2003 11 26 11 11 00 78.9067 11.8883 479.00 474.00 5.00 167446 ZEP 2003 10 30 09 50 00 65-98 P co CCGG 153.150 -999.990 ... R5 2003 11 26 11 24 00 78.9067 11.8883 479.00 474.00 5.00 167447 ZEP 2003 10 30 09 50 00 66-98 P co CCGG 152.850 -999.990 ... R5 2003 11 26 11 37 00 78.9067 11.8883 479.00 474.00 5.00 167448 ZEP 2003 11 06 08 10 00 793-91 P co CCGG 161.450 -999.990 .X. R5 2003 12 10 17 04 00 78.9067 11.8883 479.00 474.00 5.00 167449 ZEP 2003 11 06 08 10 00 794-91 P co CCGG 161.510 -999.990 .X. R5 2003 12 10 17 17 00 78.9067 11.8883 479.00 474.00 5.00 167450 ZEP 2003 11 13 09 11 00 803-91 P co CCGG 143.450 -999.990 ... R5 2003 12 10 17 32 00 78.9067 11.8883 479.00 474.00 5.00 167451 ZEP 2003 11 13 09 11 00 804-91 P co CCGG 143.960 -999.990 ... R5 2003 12 10 17 45 00 78.9067 11.8883 479.00 474.00 5.00 167452 ZEP 2003 11 20 13 31 00 6383-66 P co CCGG 145.920 -999.990 ... R5 2003 12 29 10 12 00 78.9067 11.8883 479.00 474.00 5.00 167453 ZEP 2003 11 20 13 31 00 6384-66 P co CCGG 145.710 -999.990 ... R5 2003 12 29 10 25 00 78.9067 11.8883 479.00 474.00 5.00 167454 ZEP 2003 11 27 09 00 00 2073-99 P co CCGG 149.490 -999.990 ... R5 2003 12 29 10 40 00 78.9067 11.8883 479.00 474.00 5.00 167455 ZEP 2003 11 27 09 00 00 2074-99 P co CCGG 149.990 -999.990 ... R5 2003 12 29 10 53 00 78.9067 11.8883 479.00 474.00 5.00 167456 ZEP 2003 12 04 08 25 00 159-98 P co CCGG 146.470 -999.990 ... R5 2004 01 15 17 38 00 78.9067 11.8883 479.00 474.00 5.00 167457 ZEP 2003 12 04 08 25 00 160-98 P co CCGG 146.260 -999.990 ... R5 2004 01 15 17 51 00 78.9067 11.8883 479.00 474.00 5.00 167458 ZEP 2003 12 11 10 33 00 2173-99 P co CCGG 153.810 -999.990 ... R5 2004 01 27 16 44 00 78.9067 11.8883 479.00 474.00 5.00 167459 ZEP 2003 12 11 10 33 00 2174-99 P co CCGG 153.590 -999.990 ... R5 2004 01 27 16 57 00 78.9067 11.8883 479.00 474.00 5.00 167460 ZEP 2003 12 18 08 41 00 631-99 P co CCGG 157.140 -999.990 ... R5 2004 01 15 18 04 00 78.9067 11.8883 479.00 474.00 5.00 167461 ZEP 2003 12 18 08 41 00 632-99 P co CCGG 157.750 -999.990 ... R5 2004 01 15 18 17 00 78.9067 11.8883 479.00 474.00 5.00 167462 ZEP 2004 01 01 12 05 00 2025-99 P co CCGG 142.670 -999.990 ... R5 2004 01 27 16 18 00 78.9067 11.8883 479.00 474.00 5.00 167463 ZEP 2004 01 01 12 05 00 2026-99 P co CCGG 143.300 -999.990 ... R5 2004 01 27 16 31 00 78.9067 11.8883 479.00 474.00 5.00 167464 ZEP 2004 01 08 08 22 00 2357-99 P co CCGG 144.750 -999.990 ... R5 2004 02 17 15 23 00 78.9067 11.8883 479.00 474.00 5.00 167465 ZEP 2004 01 08 08 22 00 2358-99 P co CCGG 144.410 -999.990 ... R5 2004 02 17 15 36 00 78.9067 11.8883 479.00 474.00 5.00 167466 ZEP 2004 01 15 09 44 00 2355-99 P co CCGG 148.480 -999.990 ... R5 2004 02 17 17 37 00 78.9067 11.8883 479.00 474.00 5.00 167467 ZEP 2004 01 15 09 44 00 2356-99 P co CCGG 148.590 -999.990 ... R5 2004 02 17 17 50 00 78.9067 11.8883 479.00 474.00 5.00 167468 ZEP 2004 01 22 11 20 00 1687-91 P co CCGG 176.630 -999.990 ... R5 2004 02 20 13 18 00 78.9067 11.8883 479.00 474.00 5.00 167469 ZEP 2004 01 29 08 10 00 1769-91 P co CCGG 162.480 -999.990 ... R5 2004 02 20 12 37 00 78.9067 11.8883 479.00 474.00 5.00 167470 ZEP 2004 01 29 08 10 00 1770-91 P co CCGG 163.210 -999.990 ... R5 2004 02 20 12 50 00 78.9067 11.8883 479.00 474.00 5.00 167471 ZEP 2004 02 05 09 13 00 2297-99 P co CCGG 201.050 -999.990 .X. R5 2004 03 01 18 25 00 78.9067 11.8883 479.00 474.00 5.00 167472 ZEP 2004 02 05 09 13 00 2298-99 P co CCGG 199.500 -999.990 .X. R5 2004 03 01 18 38 00 78.9067 11.8883 479.00 474.00 5.00 167473 ZEP 2004 02 12 13 20 00 2293-99 P co CCGG 166.630 -999.990 ... R5 2004 03 02 12 42 00 78.9067 11.8883 479.00 474.00 5.00 167474 ZEP 2004 02 12 13 20 00 2294-99 P co CCGG 167.240 -999.990 ... R5 2004 03 02 12 55 00 78.9067 11.8883 479.00 474.00 5.00 167475 ZEP 2004 02 19 07 48 00 1727-99 P co CCGG 159.380 -999.990 ... R5 2004 04 01 16 59 00 78.9067 11.8883 479.00 474.00 5.00 167476 ZEP 2004 02 19 07 48 00 1728-99 P co CCGG 159.590 -999.990 ... R5 2004 04 01 17 12 00 78.9067 11.8883 479.00 474.00 5.00 167477 ZEP 2004 02 26 13 37 00 1499-99 P co CCGG 160.540 -999.990 ... R5 2004 04 01 17 26 00 78.9067 11.8883 479.00 474.00 5.00 167478 ZEP 2004 02 26 13 37 00 1500-99 P co CCGG 161.060 -999.990 ... R5 2004 04 01 17 39 00 78.9067 11.8883 479.00 474.00 5.00 167479 ZEP 2004 03 04 09 17 00 2341-99 P co CCGG 181.960 -999.990 ... R5 2004 04 01 09 46 00 78.9067 11.8883 479.00 474.00 5.00 167480 ZEP 2004 03 04 09 17 00 2342-99 P co CCGG 180.990 -999.990 ... R5 2004 04 01 09 59 00 78.9067 11.8883 479.00 474.00 5.00 167481 ZEP 2004 03 12 09 15 00 743-91 P co CCGG 166.210 -999.990 ... R5 2004 04 01 10 12 00 78.9067 11.8883 479.00 474.00 5.00 167482 ZEP 2004 03 12 09 15 00 744-91 P co CCGG 166.360 -999.990 ... R5 2004 04 01 10 25 00 78.9067 11.8883 479.00 474.00 5.00 167483 ZEP 2004 03 18 08 30 00 4333-91 P co CCGG 190.800 -999.990 .X. R5 2004 04 16 10 51 00 78.9067 11.8883 479.00 474.00 5.00 167484 ZEP 2004 03 18 08 30 00 4334-91 P co CCGG 190.400 -999.990 .X. R5 2004 04 16 11 04 00 78.9067 11.8883 479.00 474.00 5.00 167485 ZEP 2004 03 25 08 55 00 6369-66 P co CCGG 174.420 -999.990 ... R5 2004 04 16 11 17 00 78.9067 11.8883 479.00 474.00 5.00 167486 ZEP 2004 03 25 08 55 00 6370-66 P co CCGG 174.360 -999.990 ... R5 2004 04 16 11 30 00 78.9067 11.8883 479.00 474.00 5.00 167487 ZEP 2004 04 01 13 32 00 1183-99 P co CCGG 171.900 -999.990 ... R5 2004 05 05 12 20 00 78.9067 11.8883 479.00 474.00 5.00 167488 ZEP 2004 04 01 13 32 00 1184-99 P co CCGG 171.100 -999.990 ... R5 2004 05 05 12 33 00 78.9067 11.8883 479.00 474.00 5.00 167489 ZEP 2004 04 11 09 41 00 1939-99 P co CCGG 175.110 -999.990 ... R5 2004 05 05 12 46 00 78.9067 11.8883 479.00 474.00 5.00 167490 ZEP 2004 04 11 09 41 00 1940-99 P co CCGG 172.210 -999.990 ... R5 2004 05 05 12 59 00 78.9067 11.8883 479.00 474.00 5.00 167491 ZEP 2004 04 15 08 30 00 3115-99 P co CCGG 176.050 -999.990 ... R5 2004 05 18 10 23 00 78.9067 11.8883 479.00 474.00 5.00 167492 ZEP 2004 04 15 08 30 00 3116-99 P co CCGG 177.500 -999.990 ... R5 2004 05 18 10 36 00 78.9067 11.8883 479.00 474.00 5.00 167493 ZEP 2004 04 22 07 13 00 3117-99 P co CCGG 163.210 -999.990 ... R5 2004 05 18 09 55 00 78.9067 11.8883 479.00 474.00 5.00 167494 ZEP 2004 04 22 07 13 00 3118-99 P co CCGG 162.580 -999.990 ... R5 2004 05 18 10 08 00 78.9067 11.8883 479.00 474.00 5.00 167495 ZEP 2004 04 29 08 00 00 6035-66 P co CCGG 156.090 -999.990 ... R5 2004 05 26 09 27 00 78.9067 11.8883 479.00 474.00 5.00 167496 ZEP 2004 04 29 08 00 00 6036-66 P co CCGG 155.020 -999.990 ... R5 2004 05 26 09 40 00 78.9067 11.8883 479.00 474.00 5.00 167497 ZEP 2004 05 06 07 44 00 2937-99 P co CCGG 155.040 -999.990 ... R5 2004 05 26 09 53 00 78.9067 11.8883 479.00 474.00 5.00 167498 ZEP 2004 05 06 07 44 00 2938-99 P co CCGG 156.110 -999.990 ... R5 2004 05 26 10 06 00 78.9067 11.8883 479.00 474.00 5.00 167499 ZEP 2004 05 13 08 05 00 955-99 P co CCGG 140.720 -999.990 ... R5 2004 07 08 12 32 00 78.9067 11.8883 479.00 474.00 5.00 167500 ZEP 2004 05 13 08 05 00 956-99 P co CCGG 140.900 -999.990 ... R5 2004 07 08 12 45 00 78.9067 11.8883 479.00 474.00 5.00 167501 ZEP 2004 05 20 17 36 00 1613-99 P co CCGG 138.950 -999.990 ... R5 2004 07 08 12 06 00 78.9067 11.8883 479.00 474.00 5.00 167502 ZEP 2004 05 20 17 36 00 1614-99 P co CCGG 139.140 -999.990 ... R5 2004 07 08 12 19 00 78.9067 11.8883 479.00 474.00 5.00 167503 ZEP 2004 05 24 09 37 00 3257-99 P co CCGG 97.950 -999.990 .X. R5 2004 08 03 11 54 00 78.9067 11.8883 479.00 474.00 5.00 167504 ZEP 2004 05 24 09 37 00 3258-99 P co CCGG 98.980 -999.990 .X. R5 2004 08 03 12 07 00 78.9067 11.8883 479.00 474.00 5.00 167505 ZEP 2004 05 27 11 15 00 2717-99 P co CCGG 130.350 -999.990 ... R5 2004 07 26 11 07 00 78.9067 11.8883 479.00 474.00 5.00 167506 ZEP 2004 05 27 11 15 00 2718-99 P co CCGG 130.200 -999.990 ... R5 2004 07 26 11 20 00 78.9067 11.8883 479.00 474.00 5.00 167507 ZEP 2004 06 03 06 35 00 2757-99 P co CCGG 117.450 -999.990 ... R5 2004 07 26 11 35 00 78.9067 11.8883 479.00 474.00 5.00 167508 ZEP 2004 06 03 06 35 00 2758-99 P co CCGG 117.890 -999.990 ... R5 2004 07 26 11 48 00 78.9067 11.8883 479.00 474.00 5.00 167509 ZEP 2004 06 10 08 37 00 633-99 P co CCGG 108.690 -999.990 ... R5 2004 07 07 10 23 00 78.9067 11.8883 479.00 474.00 5.00 167510 ZEP 2004 06 10 08 37 00 634-99 P co CCGG 108.170 -999.990 ... R5 2004 07 07 10 36 00 78.9067 11.8883 479.00 474.00 5.00 167511 ZEP 2004 06 17 06 50 00 6161-66 P co CCGG 106.570 -999.990 ... R5 2004 07 07 09 55 00 78.9067 11.8883 479.00 474.00 5.00 167512 ZEP 2004 06 17 06 50 00 6162-66 P co CCGG 106.820 -999.990 ... R5 2004 07 07 10 08 00 78.9067 11.8883 479.00 474.00 5.00 167513 ZEP 2004 07 01 08 30 00 3255-99 P co CCGG 92.280 -999.990 ... R5 2004 08 03 12 20 00 78.9067 11.8883 479.00 474.00 5.00 167514 ZEP 2004 07 01 08 30 00 3256-99 P co CCGG 91.960 -999.990 ... R5 2004 08 03 12 33 00 78.9067 11.8883 479.00 474.00 5.00 167515 ZEP 2004 07 08 06 59 00 743-91 P co CCGG 84.150 -999.990 ... R5 2004 08 12 14 53 00 78.9067 11.8883 479.00 474.00 5.00 167516 ZEP 2004 07 08 06 59 00 744-91 P co CCGG 83.560 -999.990 ... R5 2004 08 12 15 06 00 78.9067 11.8883 479.00 474.00 5.00 167517 ZEP 2004 07 15 08 35 00 1855-99 P co CCGG 83.470 -999.990 ... R5 2004 08 12 13 30 00 78.9067 11.8883 479.00 474.00 5.00 167518 ZEP 2004 07 15 08 35 00 1856-99 P co CCGG 82.500 -999.990 ... R5 2004 08 12 13 43 00 78.9067 11.8883 479.00 474.00 5.00 167519 ZEP 2004 07 22 12 50 00 1129-99 P co CCGG 91.420 -999.990 ... R5 2004 09 30 13 01 00 78.9067 11.8883 479.00 474.00 5.00 188784 ZEP 2004 07 22 12 50 00 1130-99 P co CCGG 90.520 -999.990 ... R5 2004 09 30 13 15 00 78.9067 11.8883 479.00 474.00 5.00 188785 ZEP 2004 07 27 10 34 00 1007-99 P co CCGG 102.020 -999.990 ... R5 2004 09 30 12 33 00 78.9067 11.8883 479.00 474.00 5.00 188782 ZEP 2004 07 27 10 34 00 1008-99 P co CCGG 102.220 -999.990 ... R5 2004 09 30 12 47 00 78.9067 11.8883 479.00 474.00 5.00 188783 ZEP 2004 07 30 10 21 00 2777-99 P co CCGG 98.800 -999.990 ... R5 2004 09 30 12 05 00 78.9067 11.8883 479.00 474.00 5.00 188786 ZEP 2004 07 30 10 21 00 2778-99 P co CCGG 99.590 -999.990 ... R5 2004 09 30 12 19 00 78.9067 11.8883 479.00 474.00 5.00 188787 ZEP 2004 08 05 07 38 00 709-99 P co CCGG 109.250 -999.990 .X. R5 2004 09 30 13 29 00 78.9067 11.8883 479.00 474.00 5.00 188780 ZEP 2004 08 05 07 38 00 710-99 P co CCGG 110.250 -999.990 .X. R5 2004 09 30 13 44 00 78.9067 11.8883 479.00 474.00 5.00 188781 ZEP 2004 08 12 07 12 00 803-91 P co CCGG 93.350 -999.990 ... R5 2004 10 04 17 31 00 78.9067 11.8883 479.00 474.00 5.00 188975 ZEP 2004 08 12 07 12 00 804-91 P co CCGG 93.660 -999.990 ... R5 2004 10 04 17 45 00 78.9067 11.8883 479.00 474.00 5.00 188976 ZEP 2004 08 18 07 15 00 793-91 P co CCGG 89.730 -999.990 ... R5 2004 10 04 17 59 00 78.9067 11.8883 479.00 474.00 5.00 188973 ZEP 2004 08 18 07 15 00 794-91 P co CCGG 90.450 -999.990 ... R5 2004 10 04 18 13 00 78.9067 11.8883 479.00 474.00 5.00 188974 ZEP 2004 08 26 07 35 00 3487-99 P co CCGG 96.590 -999.990 ... R5 2004 10 07 18 25 00 78.9067 11.8883 479.00 474.00 5.00 189645 ZEP 2004 08 26 07 35 00 3488-99 P co CCGG 97.130 -999.990 ... R5 2004 10 07 18 39 00 78.9067 11.8883 479.00 474.00 5.00 189646 ZEP 2004 09 09 07 25 00 1911-99 P co CCGG 102.660 -999.990 ... R5 2004 10 07 18 53 00 78.9067 11.8883 479.00 474.00 5.00 189643 ZEP 2004 09 09 07 25 00 1912-99 P co CCGG 102.010 -999.990 ... R5 2004 10 07 19 07 00 78.9067 11.8883 479.00 474.00 5.00 189644 ZEP 2004 09 16 10 14 00 3903-99 P co CCGG 105.530 -999.990 ... R5 2004 11 01 16 10 00 78.9067 11.8883 479.00 474.00 5.00 190677 ZEP 2004 09 16 10 14 00 3904-99 P co CCGG 107.450 -999.990 ... R5 2004 11 01 16 24 00 78.9067 11.8883 479.00 474.00 5.00 190678 ZEP 2004 09 23 07 30 00 3895-99 P co CCGG 108.410 -999.990 ... R5 2004 11 01 15 29 00 78.9067 11.8883 479.00 474.00 5.00 190675 ZEP 2004 09 23 07 30 00 3896-99 P co CCGG 108.020 -999.990 ... R5 2004 11 01 15 43 00 78.9067 11.8883 479.00 474.00 5.00 190676 ZEP 2004 09 30 07 30 00 3749-99 P co CCGG 109.040 -999.990 ... R5 2004 11 05 09 13 00 78.9067 11.8883 479.00 474.00 5.00 191179 ZEP 2004 09 30 07 30 00 3750-99 P co CCGG 109.120 -999.990 ... R5 2004 11 05 09 28 00 78.9067 11.8883 479.00 474.00 5.00 191178 ZEP 2004 10 08 13 32 00 285-99 P co CCGG 109.540 -999.990 ... R5 2004 11 05 09 42 00 78.9067 11.8883 479.00 474.00 5.00 191176 ZEP 2004 10 08 13 32 00 286-99 P co CCGG 110.790 -999.990 ... R5 2004 11 05 09 56 00 78.9067 11.8883 479.00 474.00 5.00 191177 ZEP 2004 10 14 07 50 00 2647-99 P co CCGG 109.460 -999.990 ... R5 2004 11 15 09 04 00 78.9067 11.8883 479.00 474.00 5.00 191598 ZEP 2004 10 14 07 50 00 2648-99 P co CCGG 109.210 -999.990 ... R5 2004 11 15 09 18 00 78.9067 11.8883 479.00 474.00 5.00 191599 ZEP 2004 10 21 08 40 00 1791-99 P co CCGG 109.510 -999.990 ... R5 2004 11 15 10 29 00 78.9067 11.8883 479.00 474.00 5.00 191596 ZEP 2004 10 21 08 40 00 1792-99 P co CCGG 109.890 -999.990 ... R5 2004 11 15 10 43 00 78.9067 11.8883 479.00 474.00 5.00 191597 ZEP 2004 10 29 08 33 00 2197-99 P co CCGG 113.630 -999.990 ... R5 2004 11 30 16 15 00 78.9067 11.8883 479.00 474.00 5.00 192177 ZEP 2004 10 29 08 33 00 2198-99 P co CCGG 113.060 -999.990 ... R5 2004 11 30 16 29 00 78.9067 11.8883 479.00 474.00 5.00 192178 ZEP 2004 11 04 08 20 00 1485-99 P co CCGG 117.980 -999.990 ... R5 2004 11 30 16 44 00 78.9067 11.8883 479.00 474.00 5.00 192175 ZEP 2004 11 04 08 20 00 1486-99 P co CCGG 117.570 -999.990 ... R5 2004 11 30 16 58 00 78.9067 11.8883 479.00 474.00 5.00 192176 ZEP 2004 11 11 08 55 00 803-91 P co CCGG 128.120 -999.990 ... R5 2004 12 02 19 03 00 78.9067 11.8883 479.00 474.00 5.00 192477 ZEP 2004 11 11 08 55 00 804-91 P co CCGG 128.020 -999.990 ... R5 2004 12 02 19 17 00 78.9067 11.8883 479.00 474.00 5.00 192478 ZEP 2004 11 18 09 52 00 793-91 P co CCGG 125.410 -999.990 ... R5 2004 12 02 18 35 00 78.9067 11.8883 479.00 474.00 5.00 192475 ZEP 2004 11 18 09 52 00 794-91 P co CCGG 124.260 -999.990 ... R5 2004 12 02 18 49 00 78.9067 11.8883 479.00 474.00 5.00 192476 ZEP 2004 11 25 08 50 00 1159-99 P co CCGG 127.750 -999.990 ... R5 2004 12 15 12 08 00 78.9067 11.8883 479.00 474.00 5.00 192968 ZEP 2004 11 25 08 50 00 1160-99 P co CCGG 126.530 -999.990 ... R5 2004 12 15 12 22 00 78.9067 11.8883 479.00 474.00 5.00 192969 ZEP 2004 12 02 08 15 00 2079-99 P co CCGG 127.900 -999.990 ... R5 2004 12 15 12 36 00 78.9067 11.8883 479.00 474.00 5.00 192970 ZEP 2004 12 02 08 15 00 2080-99 P co CCGG 128.460 -999.990 ... R5 2004 12 15 12 50 00 78.9067 11.8883 479.00 474.00 5.00 192971 ZEP 2004 12 10 09 48 00 3441-99 P co CCGG 121.700 -999.990 ... R5 2005 01 06 13 58 00 78.9067 11.8883 479.00 474.00 5.00 193567 ZEP 2004 12 10 09 48 00 3442-99 P co CCGG 121.470 -999.990 ... R5 2005 01 06 14 12 00 78.9067 11.8883 479.00 474.00 5.00 193568 ZEP 2004 12 16 08 00 00 3443-99 P co CCGG 138.760 -999.990 ... R5 2005 01 06 15 23 00 78.9067 11.8883 479.00 474.00 5.00 193569 ZEP 2004 12 16 08 00 00 3444-99 P co CCGG 137.510 -999.990 ... R5 2005 01 06 15 37 00 78.9067 11.8883 479.00 474.00 5.00 193570 ZEP 2004 12 28 10 40 00 743-91 P co CCGG 161.730 -999.990 ... R5 2005 01 18 10 33 00 78.9067 11.8883 479.00 474.00 5.00 193991 ZEP 2004 12 28 10 40 00 744-91 P co CCGG 160.980 -999.990 ... R5 2005 01 18 10 47 00 78.9067 11.8883 479.00 474.00 5.00 193992 ZEP 2004 12 30 12 47 00 3189-99 P co CCGG 137.540 -999.990 ... R5 2005 01 18 11 01 00 78.9067 11.8883 479.00 474.00 5.00 193959 ZEP 2004 12 30 12 47 00 3190-99 P co CCGG 140.470 -999.990 ... R5 2005 01 18 11 15 00 78.9067 11.8883 479.00 474.00 5.00 193960 ZEP 2005 01 06 08 35 00 89-99 P co CCGG 155.040 -999.990 ... R5 2005 02 10 11 09 00 78.9067 11.8883 479.00 474.00 5.00 194905 ZEP 2005 01 06 08 35 00 90-99 P co CCGG 156.370 -999.990 ... R5 2005 02 10 11 23 00 78.9067 11.8883 479.00 474.00 5.00 194906 ZEP 2005 01 13 08 35 00 2745-99 P co CCGG 178.380 -999.990 .X. R5 2005 02 10 11 37 00 78.9067 11.8883 479.00 474.00 5.00 194907 ZEP 2005 01 13 08 35 00 2746-99 P co CCGG 176.940 -999.990 .X. R5 2005 02 10 11 52 00 78.9067 11.8883 479.00 474.00 5.00 194908 ZEP 2005 01 20 07 52 00 6621-66 P co CCGG 176.690 -999.990 .X. R5 2005 03 11 12 07 00 78.9067 11.8883 479.00 474.00 5.00 196322 ZEP 2005 01 20 07 52 00 6622-66 P co CCGG 176.370 -999.990 .X. R5 2005 03 11 12 21 00 78.9067 11.8883 479.00 474.00 5.00 196323 ZEP 2005 01 27 08 33 00 3779-99 P co CCGG 150.660 -999.990 ... R5 2005 02 16 13 43 00 78.9067 11.8883 479.00 474.00 5.00 195125 ZEP 2005 01 27 08 33 00 3780-99 P co CCGG 150.770 -999.990 ... R5 2005 02 16 13 57 00 78.9067 11.8883 479.00 474.00 5.00 195126 ZEP 2005 02 03 09 10 00 3961-99 P co CCGG 170.280 -999.990 ... R5 2005 02 16 13 14 00 78.9067 11.8883 479.00 474.00 5.00 195127 ZEP 2005 02 03 09 10 00 3962-99 P co CCGG 170.980 -999.990 ... R5 2005 02 16 13 28 00 78.9067 11.8883 479.00 474.00 5.00 195128 ZEP 2005 02 10 10 12 00 10-99 P co CCGG 143.050 -999.990 ... R5 2005 03 11 12 49 00 78.9067 11.8883 479.00 474.00 5.00 196320 ZEP 2005 02 10 10 12 00 9-99 P co CCGG 144.280 -999.990 ... R5 2005 03 11 12 35 00 78.9067 11.8883 479.00 474.00 5.00 196321 ZEP 2005 02 17 08 24 00 675-99 P co CCGG 148.870 -999.990 ... R5 2005 03 11 14 56 00 78.9067 11.8883 479.00 474.00 5.00 196417 ZEP 2005 02 17 08 24 00 676-99 P co CCGG 148.390 -999.990 ... R5 2005 03 11 15 10 00 78.9067 11.8883 479.00 474.00 5.00 196418 ZEP 2005 02 24 07 52 00 769-99 P co CCGG 159.800 -999.990 ... R5 2005 03 11 15 24 00 78.9067 11.8883 479.00 474.00 5.00 196415 ZEP 2005 02 24 07 52 00 770-99 P co CCGG 159.990 -999.990 ... R5 2005 03 11 15 38 00 78.9067 11.8883 479.00 474.00 5.00 196416 ZEP 2005 03 03 07 50 00 1925-99 P co CCGG 163.350 -999.990 ... R5 2005 04 04 10 08 00 78.9067 11.8883 479.00 474.00 5.00 197269 ZEP 2005 03 03 07 50 00 1926-99 P co CCGG 162.620 -999.990 ... R5 2005 04 04 10 22 00 78.9067 11.8883 479.00 474.00 5.00 197270 ZEP 2005 03 10 09 40 00 3391-99 P co CCGG 156.850 -999.990 ... R5 2005 04 04 10 36 00 78.9067 11.8883 479.00 474.00 5.00 197267 ZEP 2005 03 10 09 40 00 3392-99 P co CCGG 157.690 -999.990 ... R5 2005 04 04 10 50 00 78.9067 11.8883 479.00 474.00 5.00 197268 ZEP 2005 03 17 08 10 00 793-91 P co CCGG 163.900 -999.990 ... R5 2005 04 11 10 46 00 78.9067 11.8883 479.00 474.00 5.00 197487 ZEP 2005 03 17 08 10 00 794-91 P co CCGG 165.110 -999.990 ... R5 2005 04 11 11 00 00 78.9067 11.8883 479.00 474.00 5.00 197488 ZEP 2005 03 24 09 59 00 803-91 P co CCGG 160.330 -999.990 ... R5 2005 04 11 12 50 00 78.9067 11.8883 479.00 474.00 5.00 197489 ZEP 2005 03 24 09 59 00 804-91 P co CCGG 160.260 -999.990 ... R5 2005 04 11 13 05 00 78.9067 11.8883 479.00 474.00 5.00 197490 ZEP 2005 03 31 07 10 00 2219-99 P co CCGG 157.440 -999.990 ... R5 2005 04 29 11 55 00 78.9067 11.8883 479.00 474.00 5.00 198177 ZEP 2005 03 31 07 10 00 2220-99 P co CCGG 157.730 -999.990 ... R5 2005 04 29 12 09 00 78.9067 11.8883 479.00 474.00 5.00 198178 ZEP 2005 04 07 07 38 00 6248-66 P co CCGG 186.920 -999.990 .X. R5 2005 04 28 16 21 00 78.9067 11.8883 479.00 474.00 5.00 198176 ZEP 2005 04 14 07 18 00 3695-99 P co CCGG 170.270 -999.990 ... R5 2005 05 18 12 09 00 78.9067 11.8883 479.00 474.00 5.00 198609 ZEP 2005 04 14 07 18 00 3696-99 P co CCGG 171.820 -999.990 ... R5 2005 05 18 12 23 00 78.9067 11.8883 479.00 474.00 5.00 198610 ZEP 2005 04 21 07 28 00 3897-99 P co CCGG 158.880 -999.990 ... R5 2005 05 18 11 41 00 78.9067 11.8883 479.00 474.00 5.00 198611 ZEP 2005 04 21 07 28 00 3898-99 P co CCGG 158.490 -999.990 ... R5 2005 05 18 11 55 00 78.9067 11.8883 479.00 474.00 5.00 198612 ZEP 2005 04 28 07 24 00 3963-99 P co CCGG 160.480 -999.990 ... R5 2005 06 02 14 58 00 78.9067 11.8883 479.00 474.00 5.00 199353 ZEP 2005 04 28 07 24 00 3964-99 P co CCGG 160.560 -999.990 ... R5 2005 06 02 15 12 00 78.9067 11.8883 479.00 474.00 5.00 199354 ZEP 2005 05 05 15 13 00 3205-99 P co CCGG 151.580 -999.990 ... R5 2005 06 02 12 07 00 78.9067 11.8883 479.00 474.00 5.00 199351 ZEP 2005 05 05 15 13 00 3206-99 P co CCGG 150.490 -999.990 ... R5 2005 06 02 12 21 00 78.9067 11.8883 479.00 474.00 5.00 199352 ZEP 2005 05 12 08 40 00 313-99 P co CCGG 147.860 -999.990 ... R5 2005 06 16 14 15 00 78.9067 11.8883 479.00 474.00 5.00 200058 ZEP 2005 05 12 08 40 00 314-99 P co CCGG 148.130 -999.990 ... R5 2005 06 16 14 29 00 78.9067 11.8883 479.00 474.00 5.00 200059 ZEP 2005 05 19 07 27 00 319-99 P co CCGG 141.280 -999.990 ... R5 2005 06 16 13 46 00 78.9067 11.8883 479.00 474.00 5.00 200061 ZEP 2005 05 19 07 27 00 320-99 P co CCGG 141.070 -999.990 ... R5 2005 06 16 14 00 00 78.9067 11.8883 479.00 474.00 5.00 200062 ZEP 2005 05 26 13 02 00 2717-99 P co CCGG 127.480 -999.990 ... R5 2005 07 07 12 49 00 78.9067 11.8883 479.00 474.00 5.00 200991 ZEP 2005 05 26 13 02 00 2718-99 P co CCGG 127.660 -999.990 ... R5 2005 07 07 13 03 00 78.9067 11.8883 479.00 474.00 5.00 200992 ZEP 2005 06 02 12 35 00 803-91 P co CCGG 123.640 -999.990 ... R5 2005 07 07 12 14 00 78.9067 11.8883 479.00 474.00 5.00 200993 ZEP 2005 06 02 12 35 00 804-91 P co CCGG 123.790 -999.990 ... R5 2005 07 07 12 28 00 78.9067 11.8883 479.00 474.00 5.00 200994 ZEP 2005 06 08 09 10 00 791-91 P co CCGG 116.460 -999.990 ... R5 2005 07 18 12 37 00 78.9067 11.8883 479.00 474.00 5.00 201767 ZEP 2005 06 08 09 10 00 792-91 P co CCGG 116.380 -999.990 ... R5 2005 07 18 12 52 00 78.9067 11.8883 479.00 474.00 5.00 201768 ZEP 2005 06 16 07 19 00 733-91 P co CCGG 101.500 -999.990 ... R5 2005 07 18 13 06 00 78.9067 11.8883 479.00 474.00 5.00 201765 ZEP 2005 06 16 07 19 00 734-91 P co CCGG 101.900 -999.990 ... R5 2005 07 18 13 20 00 78.9067 11.8883 479.00 474.00 5.00 201766 ZEP 2005 06 23 07 47 00 783-91 P co CCGG 96.680 -999.990 ... R5 2005 08 22 10 12 00 78.9067 11.8883 479.00 474.00 5.00 203701 ZEP 2005 06 23 07 47 00 784-91 P co CCGG 96.740 -999.990 ... R5 2005 08 22 10 26 00 78.9067 11.8883 479.00 474.00 5.00 203702 ZEP 2005 06 30 12 50 00 811-91 P co CCGG 95.140 -999.990 ... R5 2005 08 22 09 43 00 78.9067 11.8883 479.00 474.00 5.00 203699 ZEP 2005 06 30 12 50 00 812-91 P co CCGG 94.800 -999.990 ... R5 2005 08 22 09 57 00 78.9067 11.8883 479.00 474.00 5.00 203700 ZEP 2005 07 07 14 20 00 3731-99 P co CCGG 92.230 -999.990 ... R5 2005 08 22 13 02 00 78.9067 11.8883 479.00 474.00 5.00 203711 ZEP 2005 07 07 14 20 00 3732-99 P co CCGG 91.590 -999.990 ... R5 2005 08 22 13 17 00 78.9067 11.8883 479.00 474.00 5.00 203712 ZEP 2005 07 14 13 15 00 1925-99 P co CCGG 87.640 -999.990 ... R5 2005 08 22 12 34 00 78.9067 11.8883 479.00 474.00 5.00 203713 ZEP 2005 07 14 13 15 00 1926-99 P co CCGG 87.170 -999.990 ... R5 2005 08 22 12 48 00 78.9067 11.8883 479.00 474.00 5.00 203714 ZEP 2005 07 21 08 39 00 4167-99 P co CCGG 83.880 -999.990 ... R5 2005 08 22 10 40 00 78.9067 11.8883 479.00 474.00 5.00 203703 ZEP 2005 07 21 08 39 00 4168-99 P co CCGG 84.180 -999.990 ... R5 2005 08 22 10 54 00 78.9067 11.8883 479.00 474.00 5.00 203704 ZEP 2005 07 28 07 46 00 2067-99 P co CCGG 80.860 -999.990 ... R5 2005 08 22 11 09 00 78.9067 11.8883 479.00 474.00 5.00 203705 ZEP 2005 07 28 07 46 00 2068-99 P co CCGG 80.800 -999.990 ... R5 2005 08 22 11 23 00 78.9067 11.8883 479.00 474.00 5.00 203706 ZEP 2005 08 04 07 09 00 385-99 P co CCGG 90.380 -999.990 ... R5 2005 08 31 15 52 00 78.9067 11.8883 479.00 474.00 5.00 204427 ZEP 2005 08 04 07 09 00 386-99 P co CCGG 89.780 -999.990 ... R5 2005 08 31 16 06 00 78.9067 11.8883 479.00 474.00 5.00 204428 ZEP 2005 08 06 05 53 00 2515-99 P co CCGG 83.900 -999.990 ... R5 2005 08 31 16 20 00 78.9067 11.8883 479.00 474.00 5.00 204429 ZEP 2005 08 06 05 53 00 2516-99 P co CCGG 83.160 -999.990 ... R5 2005 08 31 16 34 00 78.9067 11.8883 479.00 474.00 5.00 204430 ZEP 2005 08 11 07 33 00 743-91 P co CCGG 87.090 -999.990 ... R5 2005 09 06 12 59 00 78.9067 11.8883 479.00 474.00 5.00 205190 ZEP 2005 08 11 07 33 00 744-91 P co CCGG 86.740 -999.990 ... R5 2005 09 06 13 14 00 78.9067 11.8883 479.00 474.00 5.00 205191 ZEP 2005 08 18 07 19 00 2075-99 P co CCGG 88.570 -999.990 ... R5 2005 09 06 13 28 00 78.9067 11.8883 479.00 474.00 5.00 205193 ZEP 2005 08 18 07 19 00 2076-99 P co CCGG 88.210 -999.990 ... R5 2005 09 06 13 42 00 78.9067 11.8883 479.00 474.00 5.00 205194 ZEP 2005 08 25 08 59 00 39-99 P co CCGG 87.350 -999.990 ... R5 2005 09 23 16 21 00 78.9067 11.8883 479.00 474.00 5.00 205730 ZEP 2005 08 25 08 59 00 40-99 P co CCGG 86.940 -999.990 ... R5 2005 09 23 16 36 00 78.9067 11.8883 479.00 474.00 5.00 205731 ZEP 2005 09 01 07 45 00 1359-99 P co CCGG 88.560 -999.990 ... R5 2005 09 23 15 53 00 78.9067 11.8883 479.00 474.00 5.00 205732 ZEP 2005 09 01 07 45 00 1360-99 P co CCGG 88.840 -999.990 ... R5 2005 09 23 16 07 00 78.9067 11.8883 479.00 474.00 5.00 205733 ZEP 2005 09 08 06 59 00 343-99 P co CCGG 97.270 -999.990 ... R5 2005 10 20 10 32 00 78.9067 11.8883 479.00 474.00 5.00 206987 ZEP 2005 09 08 06 59 00 344-99 P co CCGG 96.820 -999.990 ... R5 2005 10 20 10 47 00 78.9067 11.8883 479.00 474.00 5.00 206988 ZEP 2005 09 15 07 25 00 1937-99 P co CCGG 104.330 -999.990 ... R5 2005 10 20 10 04 00 78.9067 11.8883 479.00 474.00 5.00 206989 ZEP 2005 09 15 07 25 00 1938-99 P co CCGG 104.720 -999.990 ... R5 2005 10 20 10 18 00 78.9067 11.8883 479.00 474.00 5.00 206990 ZEP 2005 09 22 07 04 00 733-91 P co CCGG 105.450 -999.990 ... R5 2005 10 27 08 52 00 78.9067 11.8883 479.00 474.00 5.00 207262 ZEP 2005 09 22 07 04 00 734-91 P co CCGG 103.730 -999.990 ... R5 2005 10 27 09 06 00 78.9067 11.8883 479.00 474.00 5.00 207263 ZEP 2005 09 29 07 32 00 3837-99 P co CCGG 104.530 -999.990 ... R5 2005 10 26 15 09 00 78.9067 11.8883 479.00 474.00 5.00 207260 ZEP 2005 09 29 07 32 00 3838-99 P co CCGG 104.930 -999.990 ... R5 2005 10 26 15 23 00 78.9067 11.8883 479.00 474.00 5.00 207261 ZEP 2005 10 06 00 00 00 803-91 P co CCGG 104.590 -999.990 ... R5 2005 11 09 09 19 00 78.9067 11.8883 479.00 474.00 5.00 207853 ZEP 2005 10 06 00 00 00 804-91 P co CCGG 104.590 -999.990 ... R5 2005 11 09 09 33 00 78.9067 11.8883 479.00 474.00 5.00 207854 ZEP 2005 10 13 07 24 00 791-91 P co CCGG 104.980 -999.990 ... R5 2005 11 09 09 48 00 78.9067 11.8883 479.00 474.00 5.00 207851 ZEP 2005 10 13 07 24 00 792-91 P co CCGG 105.160 -999.990 ... R5 2005 11 09 10 02 00 78.9067 11.8883 479.00 474.00 5.00 207852 ZEP 2005 10 20 07 31 00 139-99 P co CCGG 106.380 -999.990 ... R5 2006 01 23 15 26 00 78.9067 11.8883 479.00 474.00 5.00 211582 ZEP 2005 10 20 07 31 00 140-99 P co CCGG 105.770 -999.990 ... R5 2006 01 23 15 40 00 78.9067 11.8883 479.00 474.00 5.00 211583 ZEP 2005 10 27 08 15 00 2979-99 P co CCGG 109.440 -999.990 ... R5 2005 11 22 09 10 00 78.9067 11.8883 479.00 474.00 5.00 209067 ZEP 2005 10 27 08 15 00 2980-99 P co CCGG 109.320 -999.990 ... R5 2005 11 22 09 25 00 78.9067 11.8883 479.00 474.00 5.00 209068 ZEP 2005 11 03 07 55 00 2965-99 P co CCGG 118.650 -999.990 ... R5 2005 11 22 10 36 00 78.9067 11.8883 479.00 474.00 5.00 209065 ZEP 2005 11 03 07 55 00 2966-99 P co CCGG 118.850 -999.990 ... R5 2005 11 22 10 50 00 78.9067 11.8883 479.00 474.00 5.00 209066 ZEP 2005 11 10 08 30 00 6229-66 P co CCGG 124.140 -999.990 ... R5 2005 11 29 14 40 00 78.9067 11.8883 479.00 474.00 5.00 209601 ZEP 2005 11 10 08 30 00 6230-66 P co CCGG 124.300 -999.990 ... R5 2005 11 29 14 54 00 78.9067 11.8883 479.00 474.00 5.00 209602 ZEP 2005 11 17 09 46 00 909-99 P co CCGG 142.530 -999.990 ... R5 2005 11 29 14 11 00 78.9067 11.8883 479.00 474.00 5.00 209599 ZEP 2005 11 17 09 46 00 910-99 P co CCGG 142.260 -999.990 ... R5 2005 11 29 14 25 00 78.9067 11.8883 479.00 474.00 5.00 209600 ZEP 2005 11 24 08 23 00 4195-99 P co CCGG 153.410 -999.990 .X. R5 2005 12 19 16 34 00 78.9067 11.8883 479.00 474.00 5.00 210306 ZEP 2005 11 24 08 23 00 4196-99 P co CCGG 153.390 -999.990 .X. R5 2005 12 19 16 48 00 78.9067 11.8883 479.00 474.00 5.00 210307 ZEP 2005 12 01 08 35 00 743-91 P co CCGG 142.120 -999.990 ... R5 2005 12 19 17 03 00 78.9067 11.8883 479.00 474.00 5.00 210308 ZEP 2005 12 01 08 35 00 744-91 P co CCGG 142.100 -999.990 ... R5 2005 12 19 17 17 00 78.9067 11.8883 479.00 474.00 5.00 210309 ZEP 2005 12 08 08 05 00 305-99 P co CCGG 147.400 -999.990 ... R5 2006 02 06 17 59 00 78.9067 11.8883 479.00 474.00 5.00 212363 ZEP 2005 12 08 08 05 00 306-99 P co CCGG 147.640 -999.990 ... R5 2006 02 06 18 13 00 78.9067 11.8883 479.00 474.00 5.00 212364 ZEP 2005 12 15 07 55 00 1423-99 P co CCGG 165.140 -999.990 .X. R5 2006 01 23 15 54 00 78.9067 11.8883 479.00 474.00 5.00 211584 ZEP 2005 12 15 07 55 00 1424-99 P co CCGG 165.380 -999.990 .X. R5 2006 01 23 16 09 00 78.9067 11.8883 479.00 474.00 5.00 211585 ZEP 2005 12 22 14 12 00 599-99 P co CCGG 144.670 -999.990 ... R5 2006 01 23 14 29 00 78.9067 11.8883 479.00 474.00 5.00 211578 ZEP 2005 12 22 14 12 00 600-99 P co CCGG 144.630 -999.990 ... R5 2006 01 23 14 43 00 78.9067 11.8883 479.00 474.00 5.00 211579 ZEP 2005 12 29 07 15 00 1125-99 P co CCGG 137.660 -999.990 ... R5 2006 01 23 14 57 00 78.9067 11.8883 479.00 474.00 5.00 211580 ZEP 2005 12 29 07 15 00 1126-99 P co CCGG 137.950 -999.990 ... R5 2006 01 23 15 12 00 78.9067 11.8883 479.00 474.00 5.00 211581 ZEP 2006 01 05 09 19 00 3569-99 P co CCGG 132.630 -999.990 ... R5 2006 02 06 14 11 00 78.9067 11.8883 479.00 474.00 5.00 212041 ZEP 2006 01 05 09 19 00 3570-99 P co CCGG 132.580 -999.990 ... R5 2006 02 06 14 25 00 78.9067 11.8883 479.00 474.00 5.00 212042 ZEP 2006 01 12 07 55 00 733-91 P co CCGG 137.630 -999.990 ... R5 2006 02 06 13 42 00 78.9067 11.8883 479.00 474.00 5.00 212039 ZEP 2006 01 12 07 55 00 734-91 P co CCGG 138.310 -999.990 ... R5 2006 02 06 13 57 00 78.9067 11.8883 479.00 474.00 5.00 212040 ZEP 2006 01 19 09 35 00 4103-99 P co CCGG 188.290 -999.990 .X. R5 2006 02 06 17 30 00 78.9067 11.8883 479.00 474.00 5.00 212361 ZEP 2006 01 19 09 35 00 4104-99 P co CCGG 188.750 -999.990 .X. R5 2006 02 06 17 44 00 78.9067 11.8883 479.00 474.00 5.00 212362 ZEP 2006 01 26 08 01 00 2183-99 P co CCGG 145.060 -999.990 ... R5 2006 02 17 14 56 00 78.9067 11.8883 479.00 474.00 5.00 213046 ZEP 2006 01 26 08 01 00 2184-99 P co CCGG 144.910 -999.990 ... R5 2006 02 17 15 11 00 78.9067 11.8883 479.00 474.00 5.00 213047 ZEP 2006 02 02 08 04 00 175-99 P co CCGG 200.900 -999.990 .X. R5 2006 02 17 15 25 00 78.9067 11.8883 479.00 474.00 5.00 213044 ZEP 2006 02 02 08 04 00 176-99 P co CCGG 201.390 -999.990 .X. R5 2006 02 17 15 39 00 78.9067 11.8883 479.00 474.00 5.00 213045 ZEP 2006 02 09 08 10 00 773-99 P co CCGG 198.410 -999.990 N.. R5 2006 03 02 09 06 00 78.9067 11.8883 479.00 474.00 5.00 213476 ZEP 2006 02 09 08 10 00 793-91 P co CCGG 149.240 -999.990 ... R5 2006 03 02 08 51 00 78.9067 11.8883 479.00 474.00 5.00 213475 ZEP 2006 02 16 09 07 00 774-99 P co CCGG 150.540 -999.990 ... R5 2006 03 02 10 17 00 78.9067 11.8883 479.00 474.00 5.00 213473 ZEP 2006 02 16 09 07 00 794-91 P co CCGG 150.430 -999.990 ... R5 2006 03 02 10 31 00 78.9067 11.8883 479.00 474.00 5.00 213474 ZEP 2006 02 23 07 59 00 765-99 P co CCGG 152.980 -999.990 ... R5 2006 03 28 16 04 00 78.9067 11.8883 479.00 474.00 5.00 214430 ZEP 2006 02 23 07 59 00 766-99 P co CCGG 152.430 -999.990 ... R5 2006 03 28 16 18 00 78.9067 11.8883 479.00 474.00 5.00 214431 ZEP 2006 03 02 08 27 00 2155-99 P co CCGG 164.520 -999.990 ... R5 2006 03 22 14 36 00 78.9067 11.8883 479.00 474.00 5.00 214186 ZEP 2006 03 02 08 27 00 2156-99 P co CCGG 164.390 -999.990 ... R5 2006 03 22 14 51 00 78.9067 11.8883 479.00 474.00 5.00 214187 ZEP 2006 03 09 08 12 00 3185-99 P co CCGG 163.520 -999.990 ... R5 2006 03 22 15 05 00 78.9067 11.8883 479.00 474.00 5.00 214184 ZEP 2006 03 09 08 12 00 3186-99 P co CCGG 163.890 -999.990 ... R5 2006 03 22 15 19 00 78.9067 11.8883 479.00 474.00 5.00 214185 ZEP 2006 03 16 09 55 00 473-99 P co CCGG 173.080 -999.990 ... R5 2006 03 28 16 32 00 78.9067 11.8883 479.00 474.00 5.00 214428 ZEP 2006 03 16 09 55 00 474-99 P co CCGG 172.380 -999.990 ... R5 2006 03 28 16 46 00 78.9067 11.8883 479.00 474.00 5.00 214429 ZEP 2006 03 23 08 55 00 3917-99 P co CCGG 166.250 -999.990 ... R5 2006 04 14 09 50 00 78.9067 11.8883 479.00 474.00 5.00 215338 ZEP 2006 03 23 08 55 00 3918-99 P co CCGG 166.940 -999.990 ... R5 2006 04 14 10 04 00 78.9067 11.8883 479.00 474.00 5.00 215339 ZEP 2006 03 30 07 55 00 693-99 P co CCGG 168.260 -999.990 ... R5 2006 04 14 09 21 00 78.9067 11.8883 479.00 474.00 5.00 215336 ZEP 2006 03 30 07 55 00 694-99 P co CCGG 167.560 -999.990 ... R5 2006 04 14 09 36 00 78.9067 11.8883 479.00 474.00 5.00 215337 ZEP 2006 04 07 09 20 00 4617-99 P co CCGG 165.260 -999.990 ... R5 2006 05 05 12 30 00 78.9067 11.8883 479.00 474.00 5.00 216127 ZEP 2006 04 07 09 20 00 4618-99 P co CCGG 165.360 -999.990 ... R5 2006 05 05 12 44 00 78.9067 11.8883 479.00 474.00 5.00 216128 ZEP 2006 04 13 09 15 00 6389-66 P co CCGG 172.330 -999.990 ... R5 2006 05 05 12 59 00 78.9067 11.8883 479.00 474.00 5.00 216125 ZEP 2006 04 13 09 15 00 6390-66 P co CCGG 172.020 -999.990 ... R5 2006 05 05 13 13 00 78.9067 11.8883 479.00 474.00 5.00 216126 ZEP 2006 04 20 06 45 00 291-99 P co CCGG 160.630 -999.990 ... R5 2006 06 01 09 50 00 78.9067 11.8883 479.00 474.00 5.00 217183 ZEP 2006 04 20 06 45 00 292-99 P co CCGG 160.360 -999.990 ... R5 2006 06 01 10 04 00 78.9067 11.8883 479.00 474.00 5.00 217184 ZEP 2006 04 27 09 04 00 1803-99 P co CCGG 164.300 -999.990 ... R5 2006 05 26 10 27 00 78.9067 11.8883 479.00 474.00 5.00 216999 ZEP 2006 04 27 09 04 00 1804-99 P co CCGG 164.740 -999.990 ... R5 2006 05 26 10 41 00 78.9067 11.8883 479.00 474.00 5.00 217000 ZEP 2006 05 04 07 18 00 733-91 P co CCGG 182.080 -999.990 .X. R5 2006 05 26 10 56 00 78.9067 11.8883 479.00 474.00 5.00 217001 ZEP 2006 05 04 07 18 00 734-91 P co CCGG 182.080 -999.990 .X. R5 2006 05 26 11 10 00 78.9067 11.8883 479.00 474.00 5.00 217002 ZEP 2006 05 11 06 52 00 743-91 P co CCGG 143.560 -999.990 ... R5 2006 06 01 09 21 00 78.9067 11.8883 479.00 474.00 5.00 217185 ZEP 2006 05 11 06 52 00 744-91 P co CCGG 143.780 -999.990 ... R5 2006 06 01 09 35 00 78.9067 11.8883 479.00 474.00 5.00 217186 ZEP 2006 05 18 09 07 00 1317-99 P co CCGG 135.950 -999.990 ... R5 2006 07 13 16 25 00 78.9067 11.8883 479.00 474.00 5.00 218841 ZEP 2006 05 24 06 59 00 2947-99 P co CCGG 146.150 -999.990 ... R5 2006 06 30 11 44 00 78.9067 11.8883 479.00 474.00 5.00 218545 ZEP 2006 05 24 06 59 00 2948-99 P co CCGG 145.870 -999.990 ... R5 2006 06 30 11 58 00 78.9067 11.8883 479.00 474.00 5.00 218546 ZEP 2006 06 01 08 27 00 407-99 P co CCGG 128.000 -999.990 ... R5 2006 06 30 12 12 00 78.9067 11.8883 479.00 474.00 5.00 218543 ZEP 2006 06 01 08 27 00 408-99 P co CCGG 127.710 -999.990 ... R5 2006 06 30 12 27 00 78.9067 11.8883 479.00 474.00 5.00 218544 ZEP 2006 06 08 12 34 56 245-99 P co CCGG 117.620 -999.990 ... R5 2006 07 13 16 40 00 78.9067 11.8883 479.00 474.00 5.00 218839 ZEP 2006 06 08 12 34 56 246-99 P co CCGG 117.590 -999.990 ... R5 2006 07 13 16 54 00 78.9067 11.8883 479.00 474.00 5.00 218840 ZEP 2006 06 15 06 58 00 3293-99 P co CCGG 109.230 -999.990 ... R5 2006 07 17 10 48 00 78.9067 11.8883 479.00 474.00 5.00 219010 ZEP 2006 06 15 06 58 00 3294-99 P co CCGG 109.020 -999.990 ... R5 2006 07 17 11 02 00 78.9067 11.8883 479.00 474.00 5.00 219011 ZEP 2006 06 20 13 00 00 3631-99 P co CCGG 106.590 -999.990 ... R5 2006 07 17 10 19 00 78.9067 11.8883 479.00 474.00 5.00 219008 ZEP 2006 06 20 13 00 00 3632-99 P co CCGG 106.790 -999.990 ... R5 2006 07 17 10 33 00 78.9067 11.8883 479.00 474.00 5.00 219009 ZEP 2006 06 22 08 29 00 3915-99 P co CCGG 103.180 -999.990 ... R5 2006 07 27 10 20 00 78.9067 11.8883 479.00 474.00 5.00 219685 ZEP 2006 06 22 08 29 00 3916-99 P co CCGG 103.520 -999.990 ... R5 2006 07 27 10 34 00 78.9067 11.8883 479.00 474.00 5.00 219686 ZEP 2006 07 02 12 26 00 1999-99 P co CCGG 95.670 -999.990 ... R5 2006 07 27 10 49 00 78.9067 11.8883 479.00 474.00 5.00 219687 ZEP 2006 07 02 12 26 00 2000-99 P co CCGG 96.260 -999.990 ... R5 2006 07 27 11 03 00 78.9067 11.8883 479.00 474.00 5.00 219688 ZEP 2006 07 07 09 18 00 783-91 P co CCGG 93.550 -999.990 ... R5 2006 08 11 14 56 00 78.9067 11.8883 479.00 474.00 5.00 220421 ZEP 2006 07 07 09 18 00 784-91 P co CCGG 93.260 -999.990 ... R5 2006 08 11 15 10 00 78.9067 11.8883 479.00 474.00 5.00 220422 ZEP 2006 07 13 07 22 00 112-99 P co CCGG 94.960 -999.990 ... R5 2006 08 23 11 58 00 78.9067 11.8883 479.00 474.00 5.00 220749 ZEP 2006 07 21 07 33 00 811-91 P co CCGG 85.390 -999.990 ... R5 2006 08 11 15 24 00 78.9067 11.8883 479.00 474.00 5.00 220423 ZEP 2006 07 21 07 33 00 812-91 P co CCGG 85.950 -999.990 ... R5 2006 08 11 15 38 00 78.9067 11.8883 479.00 474.00 5.00 220424 ZEP 2006 07 30 10 21 00 1763-99 P co CCGG 84.300 -999.990 ... R5 2006 08 22 11 23 00 78.9067 11.8883 479.00 474.00 5.00 220750 ZEP 2006 07 30 10 21 00 1764-99 P co CCGG 82.600 -999.990 ... R5 2006 08 22 11 37 00 78.9067 11.8883 479.00 474.00 5.00 220751 ZEP 2006 08 03 08 36 00 557-99 P co CCGG 83.860 -999.990 ... R5 2006 09 01 09 57 00 78.9067 11.8883 479.00 474.00 5.00 221363 ZEP 2006 08 03 08 36 00 558-99 P co CCGG 82.810 -999.990 ... R5 2006 09 01 10 12 00 78.9067 11.8883 479.00 474.00 5.00 221364 ZEP 2006 08 11 07 40 00 3443-99 P co CCGG 80.150 -999.990 ... R5 2006 09 01 09 29 00 78.9067 11.8883 479.00 474.00 5.00 221365 ZEP 2006 08 11 07 40 00 3444-99 P co CCGG 80.660 -999.990 ... R5 2006 09 01 09 43 00 78.9067 11.8883 479.00 474.00 5.00 221366 ZEP 2006 08 17 07 35 00 1105-99 P co CCGG 83.580 -999.990 ... R5 2006 09 13 09 57 00 78.9067 11.8883 479.00 474.00 5.00 222073 ZEP 2006 08 17 07 35 00 1106-99 P co CCGG 83.220 -999.990 ... R5 2006 09 13 10 12 00 78.9067 11.8883 479.00 474.00 5.00 222074 ZEP 2006 08 24 08 32 00 3907-99 P co CCGG 93.570 -999.990 ... R5 2006 09 13 09 29 00 78.9067 11.8883 479.00 474.00 5.00 222071 ZEP 2006 08 24 08 32 00 3908-99 P co CCGG 92.820 -999.990 ... R5 2006 09 13 09 43 00 78.9067 11.8883 479.00 474.00 5.00 222072 ZEP 2006 08 31 07 27 00 117-99 P co CCGG 92.460 -999.990 ... R5 2006 10 17 14 53 00 78.9067 11.8883 479.00 474.00 5.00 223450 ZEP 2006 08 31 07 27 00 118-99 P co CCGG 92.420 -999.990 ... R5 2006 10 17 15 07 00 78.9067 11.8883 479.00 474.00 5.00 223451 ZEP 2006 09 07 07 28 00 3155-99 P co CCGG 99.210 -999.990 ... R5 2006 10 17 13 35 00 78.9067 11.8883 479.00 474.00 5.00 223448 ZEP 2006 09 07 07 28 00 3156-99 P co CCGG 98.800 -999.990 ... R5 2006 10 17 13 49 00 78.9067 11.8883 479.00 474.00 5.00 223449 ZEP 2006 09 14 08 44 00 733-91 P co CCGG 93.470 -999.990 ... R5 2006 10 16 08 56 00 78.9067 11.8883 479.00 474.00 5.00 223434 ZEP 2006 09 14 08 44 00 734-91 P co CCGG 92.430 -999.990 ... R5 2006 10 16 09 10 00 78.9067 11.8883 479.00 474.00 5.00 223435 ZEP 2006 09 21 07 49 00 4301-99 P co CCGG 92.550 -999.990 ... R5 2006 10 16 09 25 00 78.9067 11.8883 479.00 474.00 5.00 223432 ZEP 2006 09 21 07 49 00 4302-99 P co CCGG 92.280 -999.990 ... R5 2006 10 16 09 39 00 78.9067 11.8883 479.00 474.00 5.00 223433 ZEP 2006 09 28 07 50 00 1459-99 P co CCGG 99.720 -999.990 ... R5 2006 10 30 12 07 00 78.9067 11.8883 479.00 474.00 5.00 224033 ZEP 2006 09 28 07 50 00 1460-99 P co CCGG 98.930 -999.990 ... R5 2006 10 30 12 21 00 78.9067 11.8883 479.00 474.00 5.00 224034 ZEP 2006 10 06 08 10 00 793-91 P co CCGG 102.100 -999.990 ... R5 2006 10 30 11 38 00 78.9067 11.8883 479.00 474.00 5.00 224031 ZEP 2006 10 06 08 10 00 794-91 P co CCGG 103.040 -999.990 ... R5 2006 10 30 11 52 00 78.9067 11.8883 479.00 474.00 5.00 224032 ZEP 2006 10 15 09 45 00 4023-99 P co CCGG 103.150 -999.990 ... R5 2006 11 09 09 47 00 78.9067 11.8883 479.00 474.00 5.00 224503 ZEP 2006 10 15 09 45 00 4024-99 P co CCGG 103.640 -999.990 ... R5 2006 11 09 10 01 00 78.9067 11.8883 479.00 474.00 5.00 224504 ZEP 2006 10 19 07 00 00 743-91 P co CCGG 105.110 -999.990 ... R5 2006 11 08 14 32 00 78.9067 11.8883 479.00 474.00 5.00 224501 ZEP 2006 10 19 07 00 00 744-91 P co CCGG 105.170 -999.990 ... R5 2006 11 08 14 46 00 78.9067 11.8883 479.00 474.00 5.00 224502 ZEP 2006 10 24 10 13 00 791-91 P co CCGG 127.520 -999.990 ... R5 2007 01 03 12 08 00 78.9067 11.8883 479.00 474.00 5.00 226486 ZEP 2006 10 24 10 13 00 792-91 P co CCGG 127.390 -999.990 ... R5 2007 01 03 12 23 00 78.9067 11.8883 479.00 474.00 5.00 226487 ZEP 2006 10 26 07 15 00 1155-99 P co CCGG 110.830 -999.990 ... R5 2006 11 28 13 55 00 78.9067 11.8883 479.00 474.00 5.00 225343 ZEP 2006 10 26 07 15 00 1156-99 P co CCGG 110.810 -999.990 ... R5 2006 11 28 14 09 00 78.9067 11.8883 479.00 474.00 5.00 225344 ZEP 2006 11 02 08 05 00 3327-99 P co CCGG 113.030 -999.990 ... R5 2006 11 28 14 23 00 78.9067 11.8883 479.00 474.00 5.00 225341 ZEP 2006 11 02 08 05 00 3328-99 P co CCGG 112.630 -999.990 ... R5 2006 11 28 14 37 00 78.9067 11.8883 479.00 474.00 5.00 225342 ZEP 2006 11 09 08 00 00 2841-99 P co CCGG 114.890 -999.990 ... R5 2006 12 06 10 47 00 78.9067 11.8883 479.00 474.00 5.00 225783 ZEP 2006 11 09 08 00 00 2842-99 P co CCGG 114.520 -999.990 ... R5 2006 12 06 11 02 00 78.9067 11.8883 479.00 474.00 5.00 225784 ZEP 2006 11 16 17 50 00 141-99 P co CCGG 139.470 -999.990 ... R5 2006 12 06 10 19 00 78.9067 11.8883 479.00 474.00 5.00 225781 ZEP 2006 11 16 17 50 00 142-99 P co CCGG 140.120 -999.990 ... R5 2006 12 06 10 33 00 78.9067 11.8883 479.00 474.00 5.00 225782 ZEP 2006 11 30 08 35 00 803-91 P co CCGG 157.710 -999.990 .X. R5 2007 01 03 12 37 00 78.9067 11.8883 479.00 474.00 5.00 226484 ZEP 2006 11 30 08 35 00 804-91 P co CCGG 157.640 -999.990 .X. R5 2007 01 03 12 51 00 78.9067 11.8883 479.00 474.00 5.00 226485 ZEP 2006 12 07 13 00 00 2777-99 P co CCGG 138.200 -999.990 ... R5 2007 01 30 17 55 00 78.9067 11.8883 479.00 474.00 5.00 227668 ZEP 2006 12 07 13 00 00 2778-99 P co CCGG 138.170 -999.990 ... R5 2007 01 30 18 10 00 78.9067 11.8883 479.00 474.00 5.00 227669 ZEP 2006 12 16 11 02 00 613-99 P co CCGG 159.030 -999.990 ... R5 2007 01 30 18 24 00 78.9067 11.8883 479.00 474.00 5.00 227670 ZEP 2006 12 16 11 02 00 614-99 P co CCGG 158.220 -999.990 ... R5 2007 01 30 18 38 00 78.9067 11.8883 479.00 474.00 5.00 227671 ZEP 2006 12 21 08 00 00 2317-99 P co CCGG 135.930 -999.990 ... R5 2007 02 23 12 30 00 78.9067 11.8883 479.00 474.00 5.00 229444 ZEP 2006 12 21 08 00 00 2318-99 P co CCGG 135.650 -999.990 ... R5 2007 02 23 12 44 00 78.9067 11.8883 479.00 474.00 5.00 229445 ZEP 2006 12 28 07 53 00 2815-99 P co CCGG 138.810 -999.990 ... R5 2007 02 23 12 01 00 78.9067 11.8883 479.00 474.00 5.00 229442 ZEP 2006 12 28 07 53 00 2816-99 P co CCGG 138.970 -999.990 ... R5 2007 02 23 12 16 00 78.9067 11.8883 479.00 474.00 5.00 229443 ZEP 2007 01 05 09 36 00 3563-99 P co CCGG 149.030 -999.990 ... R5 2007 02 26 09 34 00 78.9067 11.8883 479.00 474.00 5.00 229446 ZEP 2007 01 05 09 36 00 3564-99 P co CCGG 148.800 -999.990 ... R5 2007 02 26 09 48 00 78.9067 11.8883 479.00 474.00 5.00 229447 ZEP 2007 01 12 08 00 00 3193-99 P co CCGG 148.490 -999.990 ... R5 2007 02 26 10 59 00 78.9067 11.8883 479.00 474.00 5.00 229448 ZEP 2007 01 12 08 00 00 3194-99 P co CCGG 148.940 -999.990 ... R5 2007 02 26 11 13 00 78.9067 11.8883 479.00 474.00 5.00 229449 ZEP 2007 01 18 08 09 00 793-91 P co CCGG 154.720 -999.990 ... R5 2007 02 26 12 28 00 78.9067 11.8883 479.00 474.00 5.00 229452 ZEP 2007 01 18 08 09 00 794-91 P co CCGG 155.490 -999.990 ... R5 2007 02 26 12 42 00 78.9067 11.8883 479.00 474.00 5.00 229453 ZEP 2007 01 25 08 09 00 733-91 P co CCGG 143.600 -999.990 ... R5 2007 02 26 12 56 00 78.9067 11.8883 479.00 474.00 5.00 229450 ZEP 2007 01 25 08 09 00 734-91 P co CCGG 143.030 -999.990 ... R5 2007 02 26 13 10 00 78.9067 11.8883 479.00 474.00 5.00 229451 ZEP 2007 02 01 09 35 00 811-91 P co CCGG 157.660 -999.990 ... R5 2007 03 09 14 49 00 78.9067 11.8883 479.00 474.00 5.00 230249 ZEP 2007 02 01 09 35 00 812-91 P co CCGG 158.190 -999.990 ... R5 2007 03 09 15 04 00 78.9067 11.8883 479.00 474.00 5.00 230250 ZEP 2007 02 08 12 34 56 783-91 P co CCGG 155.780 -999.990 ... R5 2007 03 12 10 21 00 78.9067 11.8883 479.00 474.00 5.00 230247 ZEP 2007 02 08 12 34 56 784-91 P co CCGG 155.860 -999.990 ... R5 2007 03 12 10 35 00 78.9067 11.8883 479.00 474.00 5.00 230248 ZEP 2007 02 15 08 17 00 3135-99 P co CCGG 146.980 -999.990 ... R5 2007 03 21 15 57 00 78.9067 11.8883 479.00 474.00 5.00 230985 ZEP 2007 02 15 08 17 00 3136-99 P co CCGG 147.260 -999.990 ... R5 2007 03 21 16 11 00 78.9067 11.8883 479.00 474.00 5.00 230986 ZEP 2007 02 23 07 53 00 2585-99 P co CCGG 150.740 -999.990 ... R5 2007 03 21 15 28 00 78.9067 11.8883 479.00 474.00 5.00 230983 ZEP 2007 02 23 07 53 00 2586-99 P co CCGG 151.180 -999.990 ... R5 2007 03 21 15 42 00 78.9067 11.8883 479.00 474.00 5.00 230984 ZEP 2007 03 01 09 20 00 743-91 P co CCGG 154.350 -999.990 ... R5 2007 04 06 14 19 00 78.9067 11.8883 479.00 474.00 5.00 231728 ZEP 2007 03 01 09 20 00 744-91 P co CCGG 154.330 -999.990 ... R5 2007 04 06 14 33 00 78.9067 11.8883 479.00 474.00 5.00 231729 ZEP 2007 03 09 08 59 00 3581-99 P co CCGG 173.640 -999.990 ... R5 2007 04 06 14 47 00 78.9067 11.8883 479.00 474.00 5.00 231726 ZEP 2007 03 09 08 59 00 3582-99 P co CCGG 169.400 -999.990 ... R5 2007 04 06 15 02 00 78.9067 11.8883 479.00 474.00 5.00 231727 ZEP 2007 03 16 09 05 00 2395-99 P co CCGG 155.710 -999.990 ... R5 2007 04 23 12 09 00 78.9067 11.8883 479.00 474.00 5.00 232575 ZEP 2007 03 16 09 05 00 2396-99 P co CCGG 156.620 -999.990 ... R5 2007 04 23 12 23 00 78.9067 11.8883 479.00 474.00 5.00 232576 ZEP 2007 03 22 08 00 00 6571-66 P co CCGG 163.210 -999.990 ... R5 2007 04 23 11 41 00 78.9067 11.8883 479.00 474.00 5.00 232577 ZEP 2007 03 22 08 00 00 6572-66 P co CCGG 163.570 -999.990 ... R5 2007 04 23 11 55 00 78.9067 11.8883 479.00 474.00 5.00 232578 ZEP 2007 03 30 12 15 00 3271-99 P co CCGG 164.260 -999.990 ... R5 2007 04 30 16 39 00 78.9067 11.8883 479.00 474.00 5.00 233128 ZEP 2007 03 30 12 15 00 3272-99 P co CCGG 164.380 -999.990 ... R5 2007 04 30 16 54 00 78.9067 11.8883 479.00 474.00 5.00 233129 ZEP 2007 04 05 07 15 00 125-99 P co CCGG 167.060 -999.990 ... R5 2007 04 30 16 11 00 78.9067 11.8883 479.00 474.00 5.00 233126 ZEP 2007 04 05 07 15 00 126-99 P co CCGG 166.870 -999.990 ... R5 2007 04 30 16 25 00 78.9067 11.8883 479.00 474.00 5.00 233127 ZEP 2007 04 12 07 32 00 6061-66 P co CCGG 164.270 -999.990 ... R5 2007 05 16 14 24 00 78.9067 11.8883 479.00 474.00 5.00 233999 ZEP 2007 04 12 07 32 00 6062-66 P co CCGG 164.900 -999.990 ... R5 2007 05 16 14 38 00 78.9067 11.8883 479.00 474.00 5.00 234000 ZEP 2007 04 20 08 12 00 1138-99 P co CCGG 164.560 -999.990 ... R5 2007 05 17 11 04 00 78.9067 11.8883 479.00 474.00 5.00 233985 ZEP 2007 04 27 07 24 00 803-91 P co CCGG 157.570 -999.990 ... R5 2007 07 12 12 43 00 78.9067 11.8883 479.00 474.00 5.00 238177 ZEP 2007 04 27 07 24 00 804-91 P co CCGG 158.060 -999.990 ... R5 2007 07 12 12 57 00 78.9067 11.8883 479.00 474.00 5.00 238178 ZEP 2007 05 04 07 38 00 911-99 P co CCGG 150.180 -999.990 ... R5 2007 07 12 13 12 00 78.9067 11.8883 479.00 474.00 5.00 238179 ZEP 2007 05 04 07 38 00 912-99 P co CCGG 149.750 -999.990 ... R5 2007 07 12 13 26 00 78.9067 11.8883 479.00 474.00 5.00 238180 ZEP 2007 05 17 07 18 00 4675-99 P co CCGG 138.430 -999.990 ... R5 2007 07 17 14 39 00 78.9067 11.8883 479.00 474.00 5.00 238167 ZEP 2007 05 17 07 18 00 4676-99 P co CCGG 138.190 -999.990 ... R5 2007 07 17 14 54 00 78.9067 11.8883 479.00 474.00 5.00 238168 ZEP 2007 05 24 07 54 00 791-91 P co CCGG 126.750 -999.990 ... R5 2007 07 17 14 11 00 78.9067 11.8883 479.00 474.00 5.00 238165 ZEP 2007 05 24 07 54 00 792-91 P co CCGG 127.520 -999.990 ... R5 2007 07 17 14 25 00 78.9067 11.8883 479.00 474.00 5.00 238166 ZEP 2007 06 01 07 20 00 4077-99 P co CCGG 121.520 -999.990 ... R5 2007 07 12 11 46 00 78.9067 11.8883 479.00 474.00 5.00 238173 ZEP 2007 06 01 07 20 00 4077-99 P co CCGG 120.810 -999.990 ... R5 2007 07 12 13 43 00 78.9067 11.8883 479.00 474.00 5.00 238173 ZEP 2007 06 01 07 20 00 4078-99 P co CCGG 121.210 -999.990 ... R5 2007 07 12 12 00 00 78.9067 11.8883 479.00 474.00 5.00 238174 ZEP 2007 06 01 07 20 00 4078-99 P co CCGG 120.960 -999.990 ... R5 2007 07 12 13 58 00 78.9067 11.8883 479.00 474.00 5.00 238174 ZEP 2007 06 07 06 50 00 2019-99 P co CCGG 117.620 -999.990 ... R5 2007 07 12 12 15 00 78.9067 11.8883 479.00 474.00 5.00 238175 ZEP 2007 06 07 06 50 00 2019-99 P co CCGG 117.420 -999.990 ... R5 2007 07 12 14 12 00 78.9067 11.8883 479.00 474.00 5.00 238175 ZEP 2007 06 07 06 50 00 2020-99 P co CCGG 118.380 -999.990 ... R5 2007 07 12 12 29 00 78.9067 11.8883 479.00 474.00 5.00 238176 ZEP 2007 06 07 06 50 00 2020-99 P co CCGG 117.930 -999.990 ... R5 2007 07 12 14 26 00 78.9067 11.8883 479.00 474.00 5.00 238176 ZEP 2007 06 14 07 00 00 1757-99 P co CCGG 111.800 -999.990 ... R5 2007 07 17 15 36 00 78.9067 11.8883 479.00 474.00 5.00 238169 ZEP 2007 06 14 07 00 00 1758-99 P co CCGG 111.900 -999.990 ... R5 2007 07 17 15 50 00 78.9067 11.8883 479.00 474.00 5.00 238170 ZEP 2007 06 21 07 08 00 6413-66 P co CCGG 106.790 -999.990 ... R5 2007 07 17 15 08 00 78.9067 11.8883 479.00 474.00 5.00 238171 ZEP 2007 06 21 07 08 00 6414-66 P co CCGG 106.690 -999.990 ... R5 2007 07 17 15 22 00 78.9067 11.8883 479.00 474.00 5.00 238172 ZEP 2007 06 29 09 29 00 811-91 P co CCGG 97.240 -999.990 ... R5 2007 07 25 11 52 00 78.9067 11.8883 479.00 474.00 5.00 238667 ZEP 2007 06 29 09 29 00 812-91 P co CCGG 97.040 -999.990 ... R5 2007 07 25 12 07 00 78.9067 11.8883 479.00 474.00 5.00 238668 ZEP 2007 07 05 08 00 00 783-91 P co CCGG 91.250 -999.990 ..> R5 2007 07 25 11 24 00 78.9067 11.8883 479.00 474.00 5.00 238665 ZEP 2007 07 05 08 00 00 784-91 P co CCGG 91.390 -999.990 ... R5 2007 07 25 11 38 00 78.9067 11.8883 479.00 474.00 5.00 238666 ZEP 2007 07 12 07 50 00 573-99 P co CCGG 90.100 -999.990 ... R5 2007 08 03 14 34 00 78.9067 11.8883 479.00 474.00 5.00 239424 ZEP 2007 07 12 07 50 00 574-99 P co CCGG 89.950 -999.990 ... R5 2007 08 03 14 48 00 78.9067 11.8883 479.00 474.00 5.00 239425 ZEP 2007 07 19 07 35 00 1293-99 P co CCGG 85.090 -999.990 ... R5 2007 08 03 14 06 00 78.9067 11.8883 479.00 474.00 5.00 239422 ZEP 2007 07 19 07 35 00 1294-99 P co CCGG 84.730 -999.990 ... R5 2007 08 03 14 20 00 78.9067 11.8883 479.00 474.00 5.00 239423 ZEP 2007 07 26 12 34 56 175-99 P co CCGG 88.780 -999.990 ... R5 2007 08 24 13 44 00 78.9067 11.8883 479.00 474.00 5.00 240462 ZEP 2007 07 26 12 34 56 176-99 P co CCGG 87.620 -999.990 ... R5 2007 08 24 13 58 00 78.9067 11.8883 479.00 474.00 5.00 240463 ZEP 2007 08 02 07 40 00 4653-99 P co CCGG 87.820 -999.990 ... R5 2007 08 24 14 13 00 78.9067 11.8883 479.00 474.00 5.00 240465 ZEP 2007 08 02 07 40 00 4654-99 P co CCGG 87.650 -999.990 ... R5 2007 08 24 14 27 00 78.9067 11.8883 479.00 474.00 5.00 240466 ZEP 2007 08 09 07 30 00 3243-99 P co CCGG 82.300 -999.990 ... R5 2007 09 06 11 22 00 78.9067 11.8883 479.00 474.00 5.00 240845 ZEP 2007 08 09 07 30 00 3244-99 P co CCGG 82.450 -999.990 ... R5 2007 09 06 11 36 00 78.9067 11.8883 479.00 474.00 5.00 240846 ZEP 2007 08 16 07 20 00 6035-66 P co CCGG 86.960 -999.990 ... R5 2007 09 06 10 54 00 78.9067 11.8883 479.00 474.00 5.00 240843 ZEP 2007 08 16 07 20 00 6036-66 P co CCGG 87.560 -999.990 ... R5 2007 09 06 11 08 00 78.9067 11.8883 479.00 474.00 5.00 240844 ZEP 2007 08 23 07 22 00 733-91 P co CCGG 89.340 -999.990 ... R5 2007 09 17 17 33 00 78.9067 11.8883 479.00 474.00 5.00 241503 ZEP 2007 08 23 07 22 00 734-91 P co CCGG 89.120 -999.990 ... R5 2007 09 17 17 47 00 78.9067 11.8883 479.00 474.00 5.00 241504 ZEP 2007 08 31 08 40 00 3631-99 P co CCGG 88.440 -999.990 ... R5 2007 09 18 11 00 00 78.9067 11.8883 479.00 474.00 5.00 241505 ZEP 2007 08 31 08 40 00 3632-99 P co CCGG 88.550 -999.990 ... R5 2007 09 18 10 45 00 78.9067 11.8883 479.00 474.00 5.00 241506 ZEP 2007 09 06 07 48 00 2689-99 P co CCGG 93.220 -999.990 ... R5 2007 10 10 13 02 00 78.9067 11.8883 479.00 474.00 5.00 242947 ZEP 2007 09 06 07 48 00 2690-99 P co CCGG 91.130 -999.990 ... R5 2007 10 10 13 16 00 78.9067 11.8883 479.00 474.00 5.00 242948 ZEP 2007 09 13 09 30 00 744-91 P co CCGG 89.630 -999.990 ... R5 2007 10 10 12 34 00 78.9067 11.8883 479.00 474.00 5.00 242945 ZEP 2007 09 13 09 30 00 794-91 P co CCGG 89.070 -999.990 ... R5 2007 10 10 12 48 00 78.9067 11.8883 479.00 474.00 5.00 242946 ZEP 2007 09 20 07 43 00 3909-99 P co CCGG 95.340 -999.990 ... R5 2007 10 15 11 59 00 78.9067 11.8883 479.00 474.00 5.00 243183 ZEP 2007 09 20 07 43 00 3910-99 P co CCGG 95.870 -999.990 ... R5 2007 10 15 12 13 00 78.9067 11.8883 479.00 474.00 5.00 243184 ZEP 2007 09 27 06 38 00 339-99 P co CCGG 99.180 -999.990 ... R5 2007 10 15 12 27 00 78.9067 11.8883 479.00 474.00 5.00 243181 ZEP 2007 09 27 06 38 00 340-99 P co CCGG 99.250 -999.990 ... R5 2007 10 15 12 41 00 78.9067 11.8883 479.00 474.00 5.00 243182 ZEP 2007 10 04 07 18 00 1379-99 P co CCGG 100.130 -999.990 ... R5 2007 10 26 09 36 00 78.9067 11.8883 479.00 474.00 5.00 243833 ZEP 2007 10 04 07 18 00 1380-99 P co CCGG 99.490 -999.990 ... R5 2007 10 26 09 50 00 78.9067 11.8883 479.00 474.00 5.00 243834 ZEP 2007 10 11 07 16 00 4173-99 P co CCGG 101.720 -999.990 ... R5 2007 10 26 09 08 00 78.9067 11.8883 479.00 474.00 5.00 243831 ZEP 2007 10 11 07 16 00 4174-99 P co CCGG 101.640 -999.990 ... R5 2007 10 26 09 22 00 78.9067 11.8883 479.00 474.00 5.00 243832 ZEP 2007 10 18 07 20 00 2633-99 P co CCGG 102.000 -999.990 ... R5 2007 11 09 11 57 00 78.9067 11.8883 479.00 474.00 5.00 244625 ZEP 2007 10 18 07 20 00 2634-99 P co CCGG 102.010 -999.990 ... R5 2007 11 09 12 11 00 78.9067 11.8883 479.00 474.00 5.00 244626 ZEP 2007 10 25 07 55 00 2719-99 P co CCGG 104.880 -999.990 ... R5 2007 11 09 11 28 00 78.9067 11.8883 479.00 474.00 5.00 244623 ZEP 2007 10 25 07 55 00 2720-99 P co CCGG 105.100 -999.990 ... R5 2007 11 09 11 43 00 78.9067 11.8883 479.00 474.00 5.00 244624 ZEP 2007 11 01 07 55 00 4698-99 P co CCGG 116.130 -999.990 ... R5 2007 11 30 15 51 00 78.9067 11.8883 479.00 474.00 5.00 245526 ZEP 2007 11 08 08 10 00 783-91 P co CCGG 118.780 -999.990 ... R5 2007 11 30 16 05 00 78.9067 11.8883 479.00 474.00 5.00 245524 ZEP 2007 11 08 08 10 00 784-91 P co CCGG 118.490 -999.990 ... R5 2007 11 30 16 19 00 78.9067 11.8883 479.00 474.00 5.00 245525 ZEP 2007 11 29 08 45 00 733-91 P co CCGG 139.550 -999.990 ... R5 2008 01 08 15 12 00 78.9067 11.8883 479.00 474.00 5.00 247235 ZEP 2007 11 29 08 45 00 734-91 P co CCGG 139.870 -999.990 ... R5 2008 01 08 15 27 00 78.9067 11.8883 479.00 474.00 5.00 247236 ZEP 2007 12 06 08 10 00 4283-99 P co CCGG 132.670 -999.990 ... R5 2008 01 08 15 41 00 78.9067 11.8883 479.00 474.00 5.00 247234 ZEP 2007 12 06 08 30 00 811-91 P co CCGG 137.120 -999.990 ... V2 2008 01 28 13 15 00 78.9067 11.8883 479.00 474.00 5.00 248507 ZEP 2007 12 06 08 30 00 812-91 P co CCGG 135.550 -999.990 ... V2 2008 01 28 13 30 00 78.9067 11.8883 479.00 474.00 5.00 248508 ZEP 2007 12 13 08 17 00 4639-99 P co CCGG 129.790 -999.990 ... V2 2008 01 28 14 48 00 78.9067 11.8883 479.00 474.00 5.00 248511 ZEP 2007 12 13 08 17 00 4640-99 P co CCGG 130.090 -999.990 ... V2 2008 01 28 15 03 00 78.9067 11.8883 479.00 474.00 5.00 248512 ZEP 2007 12 20 08 05 00 744-91 P co CCGG 139.840 -999.990 ... V2 2008 01 28 14 32 00 78.9067 11.8883 479.00 474.00 5.00 248510 ZEP 2007 12 20 08 05 00 794-91 P co CCGG 139.650 -999.990 ... V2 2008 01 28 14 17 00 78.9067 11.8883 479.00 474.00 5.00 248509 ZEP 2007 12 27 08 10 00 791-91 P co CCGG 152.320 -999.990 ... V2 2008 01 28 13 46 00 78.9067 11.8883 479.00 474.00 5.00 248505 ZEP 2007 12 27 08 10 00 792-91 P co CCGG 152.110 -999.990 ... V2 2008 01 28 14 01 00 78.9067 11.8883 479.00 474.00 5.00 248506 ZEP 2008 01 03 07 56 00 17-99 P co CCGG 133.200 -999.990 ... R5 2008 02 11 11 29 00 78.9067 11.8883 479.00 474.00 5.00 249151 ZEP 2008 01 03 07 56 00 18-99 P co CCGG 132.870 -999.990 ... R5 2008 02 11 11 43 00 78.9067 11.8883 479.00 474.00 5.00 249152 ZEP 2008 01 10 08 47 00 3749-99 P co CCGG 144.020 -999.990 ... R5 2008 02 11 11 57 00 78.9067 11.8883 479.00 474.00 5.00 249149 ZEP 2008 01 10 08 47 00 3750-99 P co CCGG 144.410 -999.990 ... R5 2008 02 11 12 11 00 78.9067 11.8883 479.00 474.00 5.00 249150 ZEP 2008 01 17 08 40 00 55-99 P co CCGG 218.080 -999.990 .X. V2 2008 02 12 13 36 00 78.9067 11.8883 479.00 474.00 5.00 249224 ZEP 2008 01 17 08 40 00 56-99 P co CCGG 218.240 -999.990 .X. V2 2008 02 12 13 52 00 78.9067 11.8883 479.00 474.00 5.00 249225 ZEP 2008 01 24 09 58 00 2973-99 P co CCGG 154.890 -999.990 ... V2 2008 02 12 13 06 00 78.9067 11.8883 479.00 474.00 5.00 249222 ZEP 2008 01 24 09 58 00 2974-99 P co CCGG 155.870 -999.990 ... V2 2008 02 12 13 21 00 78.9067 11.8883 479.00 474.00 5.00 249223 ZEP 2008 01 31 08 00 00 1223-99 P co CCGG 165.370 -999.990 ... V2 2008 03 13 15 45 00 78.9067 11.8883 479.00 474.00 5.00 251028 ZEP 2008 01 31 08 00 00 1224-99 P co CCGG 165.390 -999.990 ... V2 2008 03 13 16 00 00 78.9067 11.8883 479.00 474.00 5.00 251029 ZEP 2008 02 07 08 03 00 1677-99 P co CCGG 162.650 -999.990 ... V2 2008 03 13 16 16 00 78.9067 11.8883 479.00 474.00 5.00 251030 ZEP 2008 02 07 08 03 00 1678-99 P co CCGG 163.400 -999.990 ... V2 2008 03 13 16 31 00 78.9067 11.8883 479.00 474.00 5.00 251031 ZEP 2008 02 14 08 53 00 485-99 P co CCGG 158.270 -999.990 ... V2 2008 03 14 14 13 00 78.9067 11.8883 479.00 474.00 5.00 250894 ZEP 2008 02 14 08 53 00 486-99 P co CCGG 158.090 -999.990 ... V2 2008 03 14 14 28 00 78.9067 11.8883 479.00 474.00 5.00 250895 ZEP 2008 02 21 13 15 00 199-99 P co CCGG 151.320 -999.990 ... V2 2008 03 14 13 42 00 78.9067 11.8883 479.00 474.00 5.00 250892 ZEP 2008 02 21 13 15 00 200-99 P co CCGG 150.540 -999.990 ... V2 2008 03 14 13 57 00 78.9067 11.8883 479.00 474.00 5.00 250893 ZEP 2008 02 28 08 20 00 4983-99 P co CCGG 152.160 -999.990 ... R5 2008 03 27 12 09 00 78.9067 11.8883 479.00 474.00 5.00 251517 ZEP 2008 02 28 08 20 00 4984-99 P co CCGG 152.350 -999.990 ... R5 2008 03 27 12 24 00 78.9067 11.8883 479.00 474.00 5.00 251518 ZEP 2008 03 06 08 00 00 4987-99 P co CCGG 177.350 -999.990 ... R5 2008 03 27 12 38 00 78.9067 11.8883 479.00 474.00 5.00 251515 ZEP 2008 03 06 08 00 00 4988-99 P co CCGG 177.230 -999.990 ... R5 2008 03 27 12 52 00 78.9067 11.8883 479.00 474.00 5.00 251516 ZEP 2008 03 13 08 06 00 563-99 P co CCGG 168.060 -999.990 ... V2 2008 04 17 11 40 00 78.9067 11.8883 479.00 474.00 5.00 252622 ZEP 2008 03 13 08 06 00 564-99 P co CCGG 169.550 -999.990 ... V2 2008 04 17 11 56 00 78.9067 11.8883 479.00 474.00 5.00 252623 ZEP 2008 03 20 11 00 00 2067-99 P co CCGG 166.940 -999.990 ... R5 2008 04 17 11 35 00 78.9067 11.8883 479.00 474.00 5.00 252620 ZEP 2008 03 20 11 00 00 2068-99 P co CCGG 166.430 -999.990 ... R5 2008 04 17 11 50 00 78.9067 11.8883 479.00 474.00 5.00 252621 ZEP 2008 03 27 08 21 00 621-99 P co CCGG 172.680 -999.990 ... V2 2008 04 22 13 46 00 78.9067 11.8883 479.00 474.00 5.00 252952 ZEP 2008 03 27 08 21 00 622-99 P co CCGG 172.030 -999.990 ... V2 2008 04 22 14 01 00 78.9067 11.8883 479.00 474.00 5.00 252953 ZEP 2008 04 03 07 54 00 2035-99 P co CCGG 169.510 -999.990 ... V2 2008 04 23 10 08 00 78.9067 11.8883 479.00 474.00 5.00 252950 ZEP 2008 04 03 07 54 00 2036-99 P co CCGG 169.360 -999.990 ... V2 2008 04 23 10 23 00 78.9067 11.8883 479.00 474.00 5.00 252951 ZEP 2008 04 10 07 40 00 4491-99 P co CCGG 160.390 -999.990 ... V2 2008 05 16 12 16 00 78.9067 11.8883 479.00 474.00 5.00 254219 ZEP 2008 04 10 07 40 00 4492-99 P co CCGG 159.730 -999.990 ... V2 2008 05 16 12 31 00 78.9067 11.8883 479.00 474.00 5.00 254220 ZEP 2008 04 24 06 53 00 791-91 P co CCGG 161.920 -999.990 ... V2 2008 05 21 09 50 00 78.9067 11.8883 479.00 474.00 5.00 254417 ZEP 2008 04 24 06 53 00 792-91 P co CCGG 161.630 -999.990 ... V2 2008 05 21 10 05 00 78.9067 11.8883 479.00 474.00 5.00 254418 ZEP 2008 05 01 06 44 00 811-91 P co CCGG 163.630 -999.990 ... V2 2008 05 21 09 19 00 78.9067 11.8883 479.00 474.00 5.00 254415 ZEP 2008 05 01 06 44 00 812-91 P co CCGG 163.260 -999.990 ... V2 2008 05 21 09 35 00 78.9067 11.8883 479.00 474.00 5.00 254416 ZEP 2008 05 08 07 10 00 169-99 P co CCGG 153.170 -999.990 ... V2 2008 06 12 08 20 00 78.9067 11.8883 479.00 474.00 5.00 255522 ZEP 2008 05 15 07 25 00 4798-99 P co CCGG 151.640 -999.990 ... V2 2008 06 12 08 35 00 78.9067 11.8883 479.00 474.00 5.00 255521 ZEP 2008 05 22 07 17 00 2179-99 P co CCGG 135.430 -999.990 ... V2 2008 06 19 14 52 00 78.9067 11.8883 479.00 474.00 5.00 256037 ZEP 2008 05 22 07 17 00 2180-99 P co CCGG 135.140 -999.990 ... V2 2008 06 19 15 07 00 78.9067 11.8883 479.00 474.00 5.00 256038 ZEP 2008 05 29 06 50 00 4063-99 P co CCGG 129.020 -999.990 ... V2 2008 06 19 14 21 00 78.9067 11.8883 479.00 474.00 5.00 256035 ZEP 2008 05 29 06 50 00 4064-99 P co CCGG 129.290 -999.990 ... V2 2008 06 19 14 37 00 78.9067 11.8883 479.00 474.00 5.00 256036 ZEP 2008 06 05 07 14 00 1285-99 P co CCGG 116.700 -999.990 ... V2 2008 09 12 15 18 00 78.9067 11.8883 479.00 474.00 5.00 260562 ZEP 2008 06 05 07 14 00 1286-99 P co CCGG 117.170 -999.990 ... V2 2008 09 12 15 33 00 78.9067 11.8883 479.00 474.00 5.00 260563 ZEP 2008 06 12 06 55 00 1977-99 P co CCGG 113.360 -999.990 ... V2 2008 09 15 11 16 00 78.9067 11.8883 479.00 474.00 5.00 260564 ZEP 2008 06 12 06 55 00 1978-99 P co CCGG 113.650 -999.990 ... V2 2008 09 15 11 31 00 78.9067 11.8883 479.00 474.00 5.00 260565 ZEP 2008 06 19 07 50 00 6345-66 P co CCGG 108.930 -999.990 ... V2 2008 09 16 09 38 00 78.9067 11.8883 479.00 474.00 5.00 260542 ZEP 2008 06 19 07 50 00 6346-66 P co CCGG 108.350 -999.990 ... V2 2008 09 16 09 53 00 78.9067 11.8883 479.00 474.00 5.00 260543 ZEP 2008 06 26 12 40 00 3749-99 P co CCGG 102.900 -999.990 ... V2 2008 09 16 10 08 00 78.9067 11.8883 479.00 474.00 5.00 260540 ZEP 2008 06 26 12 40 00 3750-99 P co CCGG 102.630 -999.990 ... V2 2008 09 16 10 24 00 78.9067 11.8883 479.00 474.00 5.00 260541 ZEP 2008 07 03 07 35 00 487-99 P co CCGG 93.990 -999.990 ... V2 2008 09 15 15 53 00 78.9067 11.8883 479.00 474.00 5.00 260536 ZEP 2008 07 03 07 35 00 488-99 P co CCGG 95.000 -999.990 ... V2 2008 09 15 16 08 00 78.9067 11.8883 479.00 474.00 5.00 260537 ZEP 2008 07 17 07 30 00 3649-99 P co CCGG 83.500 -999.990 ... V2 2008 09 15 16 24 00 78.9067 11.8883 479.00 474.00 5.00 260538 ZEP 2008 07 17 07 30 00 3650-99 P co CCGG 83.260 -999.990 ... V2 2008 09 15 16 39 00 78.9067 11.8883 479.00 474.00 5.00 260539 ZEP 2008 07 27 10 28 00 947-99 P co CCGG 86.110 -999.990 ... V2 2008 09 12 14 16 00 78.9067 11.8883 479.00 474.00 5.00 260560 ZEP 2008 07 27 10 28 00 948-99 P co CCGG 86.240 -999.990 ... V2 2008 09 12 14 31 00 78.9067 11.8883 479.00 474.00 5.00 260561 ZEP 2008 07 31 08 28 00 4733-99 P co CCGG 80.760 -999.990 ... V2 2008 09 12 14 47 00 78.9067 11.8883 479.00 474.00 5.00 260558 ZEP 2008 07 31 08 28 00 4734-99 P co CCGG 80.740 -999.990 ... V2 2008 09 12 15 02 00 78.9067 11.8883 479.00 474.00 5.00 260559 ZEP 2008 08 07 07 40 00 733-91 P co CCGG 85.380 -999.990 ... V2 2008 09 15 13 50 00 78.9067 11.8883 479.00 474.00 5.00 260528 ZEP 2008 08 07 07 40 00 734-91 P co CCGG 85.490 -999.990 ... V2 2008 09 15 14 05 00 78.9067 11.8883 479.00 474.00 5.00 260529 ZEP 2008 08 14 08 35 00 744-91 P co CCGG 85.690 -999.990 ... V2 2008 09 15 14 20 00 78.9067 11.8883 479.00 474.00 5.00 260530 ZEP 2008 08 14 08 35 00 794-91 P co CCGG 86.310 -999.990 ... V2 2008 09 15 14 36 00 78.9067 11.8883 479.00 474.00 5.00 260531 ZEP 2008 08 21 07 25 00 783-91 P co CCGG 92.490 -999.990 ... V2 2008 11 12 11 46 00 78.9067 11.8883 479.00 474.00 5.00 263737 ZEP 2008 08 21 07 25 00 784-91 P co CCGG 91.420 -999.990 ... V2 2008 11 12 12 01 00 78.9067 11.8883 479.00 474.00 5.00 263738 ZEP 2008 08 31 11 35 00 4985-99 P co CCGG 90.050 -999.990 ... V2 2008 11 12 12 17 00 78.9067 11.8883 479.00 474.00 5.00 263735 ZEP 2008 08 31 11 35 00 4986-99 P co CCGG 89.710 -999.990 ... V2 2008 11 12 12 32 00 78.9067 11.8883 479.00 474.00 5.00 263736 ZEP 2008 09 11 14 25 00 2397-99 P co CCGG 86.980 -999.990 ... V2 2008 11 19 15 48 00 78.9067 11.8883 479.00 474.00 5.00 263991 ZEP 2008 09 11 14 25 00 2398-99 P co CCGG 86.620 -999.990 ... V2 2008 11 19 16 04 00 78.9067 11.8883 479.00 474.00 5.00 263992 ZEP 2008 09 18 07 10 00 1087-99 P co CCGG 90.240 -999.990 ... V2 2008 11 19 16 19 00 78.9067 11.8883 479.00 474.00 5.00 263989 ZEP 2008 09 18 07 10 00 1088-99 P co CCGG 90.490 -999.990 ... V2 2008 11 19 16 34 00 78.9067 11.8883 479.00 474.00 5.00 263990 ZEP 2008 10 31 09 35 00 3261-99 P co CCGG 105.270 -999.990 ... V2 2009 03 05 11 05 00 78.9067 11.8883 479.00 474.00 5.00 270602 ZEP 2008 10 31 09 35 00 3262-99 P co CCGG 105.100 -999.990 ... V2 2009 03 05 11 20 00 78.9067 11.8883 479.00 474.00 5.00 270603 ZEP 2008 11 06 08 55 00 3407-99 P co CCGG 106.400 -999.990 ... V2 2009 01 13 10 56 00 78.9067 11.8883 479.00 474.00 5.00 267194 ZEP 2008 11 06 08 55 00 3408-99 P co CCGG 106.590 -999.990 ... V2 2009 01 13 11 12 00 78.9067 11.8883 479.00 474.00 5.00 267195 ZEP 2008 11 13 08 30 00 2313-99 P co CCGG 106.540 -999.990 ... V2 2009 01 13 10 25 00 78.9067 11.8883 479.00 474.00 5.00 267192 ZEP 2008 11 13 08 30 00 2314-99 P co CCGG 106.530 -999.990 ... V2 2009 01 13 10 41 00 78.9067 11.8883 479.00 474.00 5.00 267193 ZEP 2008 11 20 09 28 00 1273-99 P co CCGG 110.770 -999.990 ... R5 2009 01 30 13 16 00 78.9067 11.8883 479.00 474.00 5.00 268379 ZEP 2008 11 20 09 28 00 1274-99 P co CCGG 110.710 -999.990 ... R5 2009 01 30 13 30 00 78.9067 11.8883 479.00 474.00 5.00 268380 ZEP 2008 11 27 08 20 00 3191-99 P co CCGG 118.830 -999.990 ... R5 2009 01 30 13 44 00 78.9067 11.8883 479.00 474.00 5.00 268377 ZEP 2008 11 27 08 20 00 3192-99 P co CCGG 118.620 -999.990 ... R5 2009 01 30 13 59 00 78.9067 11.8883 479.00 474.00 5.00 268378 ZEP 2008 12 04 08 22 00 3159-99 P co CCGG 114.900 -999.990 ... V2 2009 03 04 16 26 00 78.9067 11.8883 479.00 474.00 5.00 270600 ZEP 2008 12 04 08 22 00 3160-99 P co CCGG 114.690 -999.990 ... V2 2009 03 04 16 42 00 78.9067 11.8883 479.00 474.00 5.00 270601 ZEP 2008 12 11 09 47 00 1617-99 P co CCGG 121.610 -999.990 ... V2 2009 03 05 10 34 00 78.9067 11.8883 479.00 474.00 5.00 270598 ZEP 2008 12 11 09 47 00 1618-99 P co CCGG 121.130 -999.990 ... V2 2009 03 05 10 50 00 78.9067 11.8883 479.00 474.00 5.00 270599 ZEP 2008 12 18 08 15 00 4843-99 P co CCGG 117.490 -999.990 ... R5 2009 01 30 12 47 00 78.9067 11.8883 479.00 474.00 5.00 268375 ZEP 2008 12 18 08 15 00 4844-99 P co CCGG 116.800 -999.990 ... R5 2009 01 30 13 02 00 78.9067 11.8883 479.00 474.00 5.00 268376 ZEP 2009 01 01 16 10 00 2121-99 P co CCGG 144.310 -999.990 ... R5 2009 01 30 12 19 00 78.9067 11.8883 479.00 474.00 5.00 268373 ZEP 2009 01 01 16 10 00 2122-99 P co CCGG 144.460 -999.990 ... R5 2009 01 30 12 33 00 78.9067 11.8883 479.00 474.00 5.00 268374 ZEP 2009 01 09 08 55 00 4273-99 P co CCGG 140.250 -999.990 ... V2 2009 05 19 14 02 00 78.9067 11.8883 479.00 474.00 5.00 275541 ZEP 2009 01 09 08 55 00 4274-99 P co CCGG 140.290 -999.990 ... V2 2009 05 19 14 17 00 78.9067 11.8883 479.00 474.00 5.00 275542 ZEP 2009 01 15 08 25 00 3011-99 P co CCGG 139.740 -999.990 ... V2 2009 05 19 14 33 00 78.9067 11.8883 479.00 474.00 5.00 275543 ZEP 2009 01 15 08 25 00 3012-99 P co CCGG 139.200 -999.990 ... V2 2009 05 19 14 48 00 78.9067 11.8883 479.00 474.00 5.00 275544 ZEP 2009 01 22 08 32 00 701-99 P co CCGG 150.320 -999.990 ... V2 2009 03 05 10 03 00 78.9067 11.8883 479.00 474.00 5.00 270604 ZEP 2009 01 22 08 32 00 702-99 P co CCGG 149.780 -999.990 ... V2 2009 03 05 10 19 00 78.9067 11.8883 479.00 474.00 5.00 270605 ZEP 2009 01 29 08 38 00 2205-99 P co CCGG 163.020 -999.990 ... V2 2009 05 19 15 34 00 78.9067 11.8883 479.00 474.00 5.00 275547 ZEP 2009 01 29 08 38 00 2206-99 P co CCGG 162.850 -999.990 ... V2 2009 05 19 15 50 00 78.9067 11.8883 479.00 474.00 5.00 275548 ZEP 2009 02 05 09 04 00 3961-99 P co CCGG 173.620 -999.990 .X. V2 2009 05 19 15 04 00 78.9067 11.8883 479.00 474.00 5.00 275545 ZEP 2009 02 05 09 04 00 3962-99 P co CCGG 173.500 -999.990 .X. V2 2009 05 19 15 19 00 78.9067 11.8883 479.00 474.00 5.00 275546 ZEP 2009 02 12 09 47 00 803-91 P co CCGG 181.140 -999.990 .X. R5 2009 06 18 13 52 00 78.9067 11.8883 479.00 474.00 5.00 276528 ZEP 2009 02 12 09 47 00 804-91 P co CCGG 181.500 -999.990 .X. R5 2009 06 18 14 06 00 78.9067 11.8883 479.00 474.00 5.00 276529 ZEP 2009 02 23 09 35 00 743-91 P co CCGG 150.600 -999.990 ... R5 2009 06 18 13 23 00 78.9067 11.8883 479.00 474.00 5.00 276526 ZEP 2009 02 23 09 35 00 793-91 P co CCGG 150.810 -999.990 ... R5 2009 06 18 13 38 00 78.9067 11.8883 479.00 474.00 5.00 276527 ZEP 2009 03 05 08 25 00 3233-99 P co CCGG 163.530 -999.990 ... V2 2009 05 19 16 05 00 78.9067 11.8883 479.00 474.00 5.00 275509 ZEP 2009 03 05 08 25 00 3234-99 P co CCGG 164.090 -999.990 ... V2 2009 05 19 16 21 00 78.9067 11.8883 479.00 474.00 5.00 275510 ZEP 2009 03 13 08 40 00 531-99 P co CCGG 158.470 -999.990 ... R5 2009 05 19 16 09 00 78.9067 11.8883 479.00 474.00 5.00 275511 ZEP 2009 03 13 08 40 00 532-99 P co CCGG 158.500 -999.990 ... R5 2009 05 19 16 23 00 78.9067 11.8883 479.00 474.00 5.00 275512 ZEP 2009 03 19 09 53 00 3983-99 P co CCGG 156.690 -999.990 ... V2 2009 05 20 10 31 00 78.9067 11.8883 479.00 474.00 5.00 275513 ZEP 2009 03 19 09 53 00 3984-99 P co CCGG 155.920 -999.990 ... V2 2009 05 20 10 47 00 78.9067 11.8883 479.00 474.00 5.00 275514 ZEP 2009 03 26 09 03 00 744-91 P co CCGG 165.330 -999.990 ... V2 2009 05 20 11 02 00 78.9067 11.8883 479.00 474.00 5.00 275515 ZEP 2009 03 26 09 03 00 794-91 P co CCGG 165.250 -999.990 ... V2 2009 05 20 11 17 00 78.9067 11.8883 479.00 474.00 5.00 275516 ZEP 2009 04 03 08 10 00 811-91 P co CCGG 152.850 -999.990 ... V2 2009 05 22 13 02 00 78.9067 11.8883 479.00 474.00 5.00 275656 ZEP 2009 04 03 08 10 00 812-91 P co CCGG 152.830 -999.990 ... V2 2009 05 22 13 18 00 78.9067 11.8883 479.00 474.00 5.00 275657 ZEP 2009 04 11 13 10 00 791-91 P co CCGG 155.180 -999.990 ... V2 2009 05 22 13 33 00 78.9067 11.8883 479.00 474.00 5.00 275654 ZEP 2009 04 11 13 10 00 792-91 P co CCGG 155.960 -999.990 ... V2 2009 05 22 13 48 00 78.9067 11.8883 479.00 474.00 5.00 275655 ZEP 2009 04 16 07 45 00 2025-99 P co CCGG 158.490 -999.990 ... V2 2009 06 18 14 20 00 78.9067 11.8883 479.00 474.00 5.00 276532 ZEP 2009 04 16 07 45 00 2026-99 P co CCGG 157.990 -999.990 ... V2 2009 06 18 14 36 00 78.9067 11.8883 479.00 474.00 5.00 276533 ZEP 2009 04 23 08 50 00 4647-99 P co CCGG 150.400 -999.990 ... V2 2009 06 18 14 51 00 78.9067 11.8883 479.00 474.00 5.00 276530 ZEP 2009 04 23 08 50 00 4648-99 P co CCGG 150.730 -999.990 ... V2 2009 06 18 15 07 00 78.9067 11.8883 479.00 474.00 5.00 276531 ZEP 2009 05 04 08 55 00 369-99 P co CCGG 139.350 -999.990 ... R5 2009 08 05 13 29 00 78.9067 11.8883 479.00 474.00 5.00 280638 ZEP 2009 05 04 08 55 00 370-99 P co CCGG 138.820 -999.990 ... R5 2009 08 05 13 43 00 78.9067 11.8883 479.00 474.00 5.00 280639 ZEP 2009 05 04 09 28 00 2615-99 P co CCGG 111.770 -999.990 .X. V2 2009 07 29 16 59 00 78.9067 11.8883 479.00 474.00 5.00 280219 ZEP 2009 05 04 09 28 00 2616-99 P co CCGG 111.880 -999.990 .X. V2 2009 07 29 17 15 00 78.9067 11.8883 479.00 474.00 5.00 280220 ZEP 2009 05 07 08 45 00 855-99 P co CCGG 142.830 -999.990 ... R5 2009 08 05 13 00 00 78.9067 11.8883 479.00 474.00 5.00 280640 ZEP 2009 05 07 08 45 00 856-99 P co CCGG 142.790 -999.990 ... R5 2009 08 05 13 15 00 78.9067 11.8883 479.00 474.00 5.00 280641 ZEP 2009 05 21 09 02 00 3737-99 P co CCGG 124.790 -999.990 ... V2 2009 07 21 15 57 00 78.9067 11.8883 479.00 474.00 5.00 279377 ZEP 2009 05 21 09 02 00 3738-99 P co CCGG 124.140 -999.990 ... V2 2009 07 21 16 12 00 78.9067 11.8883 479.00 474.00 5.00 279378 ZEP 2009 05 28 07 53 00 2131-99 P co CCGG 122.860 -999.990 ... R5 2009 07 29 16 55 00 78.9067 11.8883 479.00 474.00 5.00 280221 ZEP 2009 05 28 07 53 00 2132-99 P co CCGG 123.180 -999.990 ... R5 2009 07 29 17 09 00 78.9067 11.8883 479.00 474.00 5.00 280222 ZEP 2009 06 11 07 22 00 389-99 P co CCGG 105.340 -999.990 ... R5 2009 07 21 13 50 00 78.9067 11.8883 479.00 474.00 5.00 279278 ZEP 2009 06 11 07 22 00 390-99 P co CCGG 105.440 -999.990 ... R5 2009 07 21 14 04 00 78.9067 11.8883 479.00 474.00 5.00 279279 ZEP 2009 06 18 07 55 00 3839-99 P co CCGG 100.690 -999.990 ... R5 2009 07 21 13 21 00 78.9067 11.8883 479.00 474.00 5.00 279280 ZEP 2009 06 18 07 55 00 3840-99 P co CCGG 100.070 -999.990 ... R5 2009 07 21 13 35 00 78.9067 11.8883 479.00 474.00 5.00 279281 ZEP 2009 06 25 07 32 00 1229-99 P co CCGG 92.260 -999.990 ... R5 2009 08 25 09 50 00 78.9067 11.8883 479.00 474.00 5.00 281682 ZEP 2009 06 25 07 32 00 1230-99 P co CCGG 92.670 -999.990 ... R5 2009 08 25 10 05 00 78.9067 11.8883 479.00 474.00 5.00 281683 ZEP 2009 07 03 07 55 00 583-99 P co CCGG 84.270 -999.990 ... R5 2009 08 25 10 48 00 78.9067 11.8883 479.00 474.00 5.00 281680 ZEP 2009 07 03 07 55 00 584-99 P co CCGG 84.460 -999.990 ... R5 2009 08 25 11 02 00 78.9067 11.8883 479.00 474.00 5.00 281681 ZEP 2009 07 12 10 05 00 3417-99 P co CCGG 82.180 -999.990 ... V2 2009 08 20 11 39 00 78.9067 11.8883 479.00 474.00 5.00 281649 ZEP 2009 07 12 10 05 00 3418-99 P co CCGG 82.880 -999.990 ... V2 2009 08 20 11 54 00 78.9067 11.8883 479.00 474.00 5.00 281650 ZEP 2009 07 17 10 05 00 4757-99 P co CCGG 88.480 -999.990 ... V2 2009 08 20 12 10 00 78.9067 11.8883 479.00 474.00 5.00 281651 ZEP 2009 07 17 10 05 00 4758-99 P co CCGG 88.500 -999.990 ... V2 2009 08 20 12 25 00 78.9067 11.8883 479.00 474.00 5.00 281652 ZEP 2009 07 23 07 25 00 4575-99 P co CCGG 80.240 -999.990 ... R5 2009 08 25 11 45 00 78.9067 11.8883 479.00 474.00 5.00 281686 ZEP 2009 07 23 07 25 00 4576-99 P co CCGG 79.850 -999.990 ... R5 2009 08 25 11 59 00 78.9067 11.8883 479.00 474.00 5.00 281687 ZEP 2009 07 30 07 39 00 3591-99 P co CCGG 82.490 -999.990 ... R5 2009 08 25 11 16 00 78.9067 11.8883 479.00 474.00 5.00 281684 ZEP 2009 07 30 07 39 00 3592-99 P co CCGG 82.430 -999.990 ... R5 2009 08 25 11 30 00 78.9067 11.8883 479.00 474.00 5.00 281685 ZEP 2009 08 10 07 50 00 833-99 P co CCGG 83.860 -999.990 ... V2 2009 09 08 13 25 00 78.9067 11.8883 479.00 474.00 5.00 282944 ZEP 2009 08 10 07 50 00 834-99 P co CCGG 83.370 -999.990 ... V2 2009 09 08 13 41 00 78.9067 11.8883 479.00 474.00 5.00 282945 ZEP 2009 08 17 08 45 00 3689-99 P co CCGG 89.130 -999.990 ... V2 2009 09 08 12 55 00 78.9067 11.8883 479.00 474.00 5.00 282946 ZEP 2009 08 17 08 45 00 3690-99 P co CCGG 88.760 -999.990 ... V2 2009 09 08 13 10 00 78.9067 11.8883 479.00 474.00 5.00 282947 ZEP 2009 08 22 10 12 00 2329-99 P co CCGG 99.320 -999.990 ... V2 2009 12 14 12 36 00 78.9067 11.8883 479.00 474.00 5.00 287560 ZEP 2009 08 22 10 12 00 2330-99 P co CCGG 99.620 -999.990 ... V2 2009 12 14 12 51 00 78.9067 11.8883 479.00 474.00 5.00 287561 ZEP 2009 09 03 09 18 00 733-91 P co CCGG 99.590 -999.990 ... V2 2009 12 14 12 05 00 78.9067 11.8883 479.00 474.00 5.00 287562 ZEP 2009 09 03 09 18 00 734-91 P co CCGG 99.450 -999.990 ... V2 2009 12 14 12 20 00 78.9067 11.8883 479.00 474.00 5.00 287563 ZEP 2009 09 10 08 16 00 4918-99 P co CCGG 94.140 -999.990 ... V2 2010 03 11 15 38 00 78.9067 11.8883 479.00 474.00 5.00 291580 ZEP 2009 09 11 09 30 00 3889-99 P co CCGG 94.800 -999.990 ... V2 2010 03 11 15 07 00 78.9067 11.8883 479.00 474.00 5.00 291578 ZEP 2009 09 11 09 30 00 3890-99 P co CCGG 94.670 -999.990 ... V2 2010 03 11 15 23 00 78.9067 11.8883 479.00 474.00 5.00 291579 ZEP 2009 09 17 08 05 00 2739-99 P co CCGG 95.100 -999.990 ... V2 2009 12 10 17 26 00 78.9067 11.8883 479.00 474.00 5.00 287542 ZEP 2009 09 17 08 05 00 2740-99 P co CCGG 95.150 -999.990 ... V2 2009 12 10 17 41 00 78.9067 11.8883 479.00 474.00 5.00 287543 ZEP 2009 09 24 08 10 00 1149-99 P co CCGG 94.490 -999.990 ... V2 2009 12 10 17 57 00 78.9067 11.8883 479.00 474.00 5.00 287540 ZEP 2009 09 24 08 10 00 1150-99 P co CCGG 94.970 -999.990 ... V2 2009 12 10 18 12 00 78.9067 11.8883 479.00 474.00 5.00 287541 ZEP 2009 10 01 08 55 00 2511-99 P co CCGG 98.620 -999.990 ... V2 2009 12 14 11 34 00 78.9067 11.8883 479.00 474.00 5.00 287558 ZEP 2009 10 01 08 55 00 2512-99 P co CCGG 98.390 -999.990 ... V2 2009 12 14 11 50 00 78.9067 11.8883 479.00 474.00 5.00 287559 ZEP 2009 10 08 09 02 00 2929-99 P co CCGG 97.830 -999.990 ... V2 2009 12 14 10 33 00 78.9067 11.8883 479.00 474.00 5.00 287556 ZEP 2009 10 08 09 02 00 2930-99 P co CCGG 97.950 -999.990 ... V2 2009 12 14 10 48 00 78.9067 11.8883 479.00 474.00 5.00 287557 ZEP 2009 10 15 10 46 00 3199-99 P co CCGG 100.230 -999.990 ... V2 2009 12 11 10 46 00 78.9067 11.8883 479.00 474.00 5.00 287546 ZEP 2009 10 15 10 46 00 3200-99 P co CCGG 100.590 -999.990 ... V2 2009 12 11 11 01 00 78.9067 11.8883 479.00 474.00 5.00 287547 ZEP 2009 10 26 15 03 00 2683-99 P co CCGG 104.270 -999.990 ... V2 2009 12 10 18 28 00 78.9067 11.8883 479.00 474.00 5.00 287544 ZEP 2009 10 26 15 03 00 2684-99 P co CCGG 103.910 -999.990 ... V2 2009 12 10 18 43 00 78.9067 11.8883 479.00 474.00 5.00 287545 ZEP 2009 10 30 15 07 00 3921-99 P co CCGG 373.660 -999.990 N.. V2 2011 06 24 12 03 00 78.9067 11.8883 479.00 474.00 5.00 319594 ZEP 2009 10 30 15 07 00 3922-99 P co CCGG 491.840 -999.990 N.. V2 2011 06 24 12 19 00 78.9067 11.8883 479.00 474.00 5.00 319595 ZEP 2009 12 04 09 45 00 4849-99 P co CCGG 124.000 -999.990 ... V2 2011 06 24 12 35 00 78.9067 11.8883 479.00 474.00 5.00 319596 ZEP 2009 12 04 09 45 00 4850-99 P co CCGG 123.820 -999.990 ... V2 2011 06 24 12 52 00 78.9067 11.8883 479.00 474.00 5.00 319597 ZEP 2009 12 10 09 42 00 4927-99 P co CCGG 134.920 -999.990 ... V2 2010 03 10 10 15 00 78.9067 11.8883 479.00 474.00 5.00 291460 ZEP 2009 12 10 09 42 00 4928-99 P co CCGG 134.230 -999.990 ... V2 2010 03 10 10 30 00 78.9067 11.8883 479.00 474.00 5.00 291461 ZEP 2009 12 24 10 15 00 1413-99 P co CCGG 130.110 -999.990 ... V2 2010 03 11 15 53 00 78.9067 11.8883 479.00 474.00 5.00 291462 ZEP 2009 12 31 08 17 00 2301-99 P co CCGG 177.300 -999.990 .X. V2 2010 03 11 10 31 00 78.9067 11.8883 479.00 474.00 5.00 291569 ZEP 2009 12 31 08 17 00 2302-99 P co CCGG 176.590 -999.990 .X. V2 2010 03 11 10 47 00 78.9067 11.8883 479.00 474.00 5.00 291568 ZEP 2010 01 07 08 35 00 781-99 P co CCGG 129.010 -999.990 ... V2 2010 03 10 16 24 00 78.9067 11.8883 479.00 474.00 5.00 291566 ZEP 2010 01 07 08 35 00 782-99 P co CCGG 129.040 -999.990 ... V2 2010 03 10 16 39 00 78.9067 11.8883 479.00 474.00 5.00 291567 ZEP 2010 01 14 08 40 00 803-91 P co CCGG 129.940 -999.990 ... V2 2010 03 11 14 06 00 78.9067 11.8883 479.00 474.00 5.00 291574 ZEP 2010 01 14 08 40 00 804-91 P co CCGG 128.320 -999.990 ... V2 2010 03 11 14 22 00 78.9067 11.8883 479.00 474.00 5.00 291575 ZEP 2010 01 21 09 20 00 1583-99 P co CCGG 137.480 -999.990 ... V2 2010 03 11 14 37 00 78.9067 11.8883 479.00 474.00 5.00 291576 ZEP 2010 01 21 09 20 00 1584-99 P co CCGG 136.950 -999.990 ... V2 2010 03 11 14 52 00 78.9067 11.8883 479.00 474.00 5.00 291577 ZEP 2010 01 28 08 30 00 2189-99 P co CCGG 163.680 -999.990 ... V4 2011 07 11 12 04 00 78.9067 11.8883 479.00 474.00 5.00 320179 ZEP 2010 01 28 08 30 00 2190-99 P co CCGG 162.660 -999.990 ... V4 2011 07 11 12 20 00 78.9067 11.8883 479.00 474.00 5.00 320180 ZEP 2010 02 04 08 25 00 4025-99 P co CCGG 183.500 -999.990 .X. V4 2011 07 08 14 20 00 78.9067 11.8883 479.00 474.00 5.00 320181 ZEP 2010 02 04 08 25 00 4026-99 P co CCGG 185.710 -999.990 .X. V4 2011 07 08 14 35 00 78.9067 11.8883 479.00 474.00 5.00 320182 ZEP 2010 02 11 08 40 00 4441-99 P co CCGG 180.760 -999.990 .X. V2 2010 04 09 14 25 00 78.9067 11.8883 479.00 474.00 5.00 293445 ZEP 2010 02 11 08 40 00 4442-99 P co CCGG 182.450 -999.990 .X. V2 2010 04 09 14 40 00 78.9067 11.8883 479.00 474.00 5.00 293446 ZEP 2010 02 18 08 30 00 2989-99 P co CCGG 157.890 -999.990 ... V2 2010 04 09 14 56 00 78.9067 11.8883 479.00 474.00 5.00 293443 ZEP 2010 02 18 08 30 00 2990-99 P co CCGG 157.480 -999.990 ... V2 2010 04 09 15 11 00 78.9067 11.8883 479.00 474.00 5.00 293444 ZEP 2010 02 25 09 09 00 1999-99 P co CCGG 147.740 -999.990 ... V2 2010 04 09 13 55 00 78.9067 11.8883 479.00 474.00 5.00 293439 ZEP 2010 02 25 09 09 00 2000-99 P co CCGG 147.320 -999.990 ... V2 2010 04 09 14 10 00 78.9067 11.8883 479.00 474.00 5.00 293440 ZEP 2010 03 04 10 32 00 345-99 P co CCGG 147.110 -999.990 ... V2 2010 04 09 13 24 00 78.9067 11.8883 479.00 474.00 5.00 293441 ZEP 2010 03 04 10 32 00 346-99 P co CCGG 146.390 -999.990 ... V2 2010 04 09 13 39 00 78.9067 11.8883 479.00 474.00 5.00 293442 ZEP 2010 03 11 10 13 00 291-99 P co CCGG 166.820 -999.990 ... V2 2010 04 15 12 55 00 78.9067 11.8883 479.00 474.00 5.00 293835 ZEP 2010 03 11 10 13 00 292-99 P co CCGG 168.600 -999.990 ... V2 2010 04 15 13 11 00 78.9067 11.8883 479.00 474.00 5.00 293836 ZEP 2010 03 18 09 50 00 4137-99 P co CCGG 174.920 -999.990 ... V2 2010 04 15 12 24 00 78.9067 11.8883 479.00 474.00 5.00 293833 ZEP 2010 03 18 09 50 00 4138-99 P co CCGG 173.520 -999.990 ... V2 2010 04 15 12 40 00 78.9067 11.8883 479.00 474.00 5.00 293834 ZEP 2010 03 25 09 26 00 1549-99 P co CCGG 158.430 -999.990 ... R5 2010 04 23 13 47 00 78.9067 11.8883 479.00 474.00 5.00 295189 ZEP 2010 03 25 09 26 00 1550-99 P co CCGG 158.240 -999.990 ... R5 2010 04 23 14 02 00 78.9067 11.8883 479.00 474.00 5.00 295190 ZEP 2010 04 01 07 07 00 427-99 P co CCGG 172.600 -999.990 ... R5 2010 04 23 14 17 00 78.9067 11.8883 479.00 474.00 5.00 295187 ZEP 2010 04 01 07 07 00 428-99 P co CCGG 174.240 -999.990 ... R5 2010 04 23 14 31 00 78.9067 11.8883 479.00 474.00 5.00 295188 ZEP 2010 04 08 08 40 00 791-91 P co CCGG 160.300 -999.990 ... V2 2010 05 28 16 12 00 78.9067 11.8883 479.00 474.00 5.00 297191 ZEP 2010 04 08 08 40 00 792-91 P co CCGG 160.590 -999.990 ... V2 2010 05 28 16 27 00 78.9067 11.8883 479.00 474.00 5.00 297192 ZEP 2010 04 15 07 38 00 733-91 P co CCGG 153.150 -999.990 ... V2 2010 05 28 15 42 00 78.9067 11.8883 479.00 474.00 5.00 297193 ZEP 2010 04 15 07 38 00 734-91 P co CCGG 153.840 -999.990 ... V2 2010 05 28 15 57 00 78.9067 11.8883 479.00 474.00 5.00 297194 ZEP 2010 04 22 07 35 00 2095-99 P co CCGG 155.560 -999.990 ... V2 2010 05 28 14 41 00 78.9067 11.8883 479.00 474.00 5.00 297189 ZEP 2010 04 22 07 35 00 2096-99 P co CCGG 155.030 -999.990 ... V2 2010 05 28 14 56 00 78.9067 11.8883 479.00 474.00 5.00 297190 ZEP 2010 04 29 08 23 00 3169-99 P co CCGG 150.650 -999.990 ... V2 2010 05 28 15 11 00 78.9067 11.8883 479.00 474.00 5.00 297187 ZEP 2010 04 29 08 23 00 3170-99 P co CCGG 151.090 -999.990 ... V2 2010 05 28 15 26 00 78.9067 11.8883 479.00 474.00 5.00 297188 ZEP 2010 05 06 13 05 00 3687-99 P co CCGG 142.450 -999.990 ... R5 2010 06 11 15 27 00 78.9067 11.8883 479.00 474.00 5.00 298276 ZEP 2010 05 06 13 05 00 3688-99 P co CCGG 142.640 -999.990 ... R5 2010 06 11 15 41 00 78.9067 11.8883 479.00 474.00 5.00 298277 ZEP 2010 05 13 06 58 00 4887-99 P co CCGG 138.100 -999.990 ... R5 2010 06 11 15 56 00 78.9067 11.8883 479.00 474.00 5.00 298274 ZEP 2010 05 13 06 58 00 4888-99 P co CCGG 137.980 -999.990 ... R5 2010 06 11 16 11 00 78.9067 11.8883 479.00 474.00 5.00 298275 ZEP 2010 05 20 08 22 00 1481-99 P co CCGG 133.300 -999.990 ... R5 2010 06 11 16 25 00 78.9067 11.8883 479.00 474.00 5.00 298278 ZEP 2010 05 20 08 22 00 1482-99 P co CCGG 134.040 -999.990 ... R5 2010 06 11 16 40 00 78.9067 11.8883 479.00 474.00 5.00 298279 ZEP 2010 05 27 07 30 00 2365-99 P co CCGG 127.650 -999.990 ... R5 2010 06 14 14 12 00 78.9067 11.8883 479.00 474.00 5.00 298280 ZEP 2010 05 27 07 30 00 2366-99 P co CCGG 128.160 -999.990 ... R5 2010 06 14 14 26 00 78.9067 11.8883 479.00 474.00 5.00 298281 ZEP 2010 06 03 08 15 00 1507-99 P co CCGG 119.980 -999.990 ... V2 2010 07 27 14 18 00 78.9067 11.8883 479.00 474.00 5.00 300563 ZEP 2010 06 10 07 35 00 1357-99 P co CCGG 108.780 -999.990 ... V2 2010 07 23 13 46 00 78.9067 11.8883 479.00 474.00 5.00 300561 ZEP 2010 06 10 07 35 00 1358-99 P co CCGG 109.120 -999.990 ... V2 2010 07 23 14 02 00 78.9067 11.8883 479.00 474.00 5.00 300562 ZEP 2010 06 17 07 45 00 3411-99 P co CCGG 104.130 -999.990 ... R5 2010 07 22 11 24 00 78.9067 11.8883 479.00 474.00 5.00 300504 ZEP 2010 06 17 07 45 00 3412-99 P co CCGG 103.780 -999.990 ... R5 2010 07 22 11 39 00 78.9067 11.8883 479.00 474.00 5.00 300505 ZEP 2010 06 24 07 45 00 4419-99 P co CCGG 97.410 -999.990 ... R5 2010 07 22 11 54 00 78.9067 11.8883 479.00 474.00 5.00 300502 ZEP 2010 06 24 07 45 00 4420-99 P co CCGG 97.800 -999.990 ... R5 2010 07 22 12 08 00 78.9067 11.8883 479.00 474.00 5.00 300503 ZEP 2010 07 01 14 05 00 6017-66 P co CCGG 89.720 -999.990 ... R5 2010 07 22 13 52 00 78.9067 11.8883 479.00 474.00 5.00 300520 ZEP 2010 07 01 14 05 00 6018-66 P co CCGG 89.660 -999.990 ... R5 2010 07 22 14 07 00 78.9067 11.8883 479.00 474.00 5.00 300521 ZEP 2010 07 08 14 45 00 1893-99 P co CCGG 87.730 -999.990 ... R5 2010 07 22 14 21 00 78.9067 11.8883 479.00 474.00 5.00 300518 ZEP 2010 07 08 14 45 00 2704-99 P co CCGG 86.850 -999.990 ... R5 2010 07 22 14 36 00 78.9067 11.8883 479.00 474.00 5.00 300519 ZEP 2010 07 15 08 07 00 783-91 P co CCGG 90.500 -999.990 ... R5 2010 08 02 15 23 00 78.9067 11.8883 479.00 474.00 5.00 301151 ZEP 2010 07 15 08 07 00 784-91 P co CCGG 90.550 -999.990 ... R5 2010 08 02 15 37 00 78.9067 11.8883 479.00 474.00 5.00 301152 ZEP 2010 07 22 08 17 00 2689-99 P co CCGG 84.400 -999.990 ... R5 2010 08 03 11 15 00 78.9067 11.8883 479.00 474.00 5.00 301149 ZEP 2010 07 22 08 17 00 2690-99 P co CCGG 83.590 -999.990 ... R5 2010 08 03 11 29 00 78.9067 11.8883 479.00 474.00 5.00 301150 ZEP 2010 07 29 07 38 00 81-99 P co CCGG 84.760 -999.990 ... R5 2010 08 18 14 49 00 78.9067 11.8883 479.00 474.00 5.00 302052 ZEP 2010 07 29 07 38 00 82-99 P co CCGG 84.750 -999.990 ... R5 2010 08 18 15 03 00 78.9067 11.8883 479.00 474.00 5.00 302053 ZEP 2010 08 05 07 49 00 4639-99 P co CCGG 85.730 -999.990 ... R5 2010 08 18 15 18 00 78.9067 11.8883 479.00 474.00 5.00 302050 ZEP 2010 08 05 07 49 00 4640-99 P co CCGG 85.430 -999.990 ... R5 2010 08 18 15 33 00 78.9067 11.8883 479.00 474.00 5.00 302051 ZEP 2010 08 12 08 45 00 2809-99 P co CCGG 85.130 -999.990 ... V2 2010 09 22 13 36 00 78.9067 11.8883 479.00 474.00 5.00 304079 ZEP 2010 08 12 08 45 00 2810-99 P co CCGG 84.660 -999.990 ... V2 2010 09 22 13 52 00 78.9067 11.8883 479.00 474.00 5.00 304080 ZEP 2010 08 19 07 57 00 5017-99 P co CCGG 100.150 -999.990 ... V2 2010 09 22 13 06 00 78.9067 11.8883 479.00 474.00 5.00 304077 ZEP 2010 08 19 07 57 00 5018-99 P co CCGG 100.320 -999.990 ... V2 2010 09 22 13 21 00 78.9067 11.8883 479.00 474.00 5.00 304078 ZEP 2010 08 26 08 15 00 13-99 P co CCGG 115.470 -999.990 ... V2 2010 10 01 13 49 00 78.9067 11.8883 479.00 474.00 5.00 304754 ZEP 2010 08 26 08 15 00 14-99 P co CCGG 114.340 -999.990 ... V2 2010 10 01 14 04 00 78.9067 11.8883 479.00 474.00 5.00 304755 ZEP 2010 09 02 08 15 00 4879-99 P co CCGG 114.930 -999.990 ... V2 2010 10 01 14 19 00 78.9067 11.8883 479.00 474.00 5.00 304757 ZEP 2010 09 02 08 15 00 4880-99 P co CCGG 115.210 -999.990 ... V2 2010 10 01 14 34 00 78.9067 11.8883 479.00 474.00 5.00 304756 ZEP 2010 09 09 09 08 00 5135-99 P co CCGG 117.060 -999.990 ... V2 2010 10 13 11 41 00 78.9067 11.8883 479.00 474.00 5.00 305449 ZEP 2010 09 09 09 08 00 5136-99 P co CCGG 115.830 -999.990 ... V2 2010 10 13 11 57 00 78.9067 11.8883 479.00 474.00 5.00 305450 ZEP 2010 09 17 07 21 00 743-91 P co CCGG 114.580 -999.990 ... V2 2010 10 13 12 27 00 78.9067 11.8883 479.00 474.00 5.00 305448 ZEP 2010 09 17 07 21 00 793-91 P co CCGG 114.570 -999.990 ... V2 2010 10 13 12 12 00 78.9067 11.8883 479.00 474.00 5.00 305447 ZEP 2010 09 23 07 10 00 2097-99 P co CCGG 118.990 -999.990 ... V2 2010 10 27 14 25 00 78.9067 11.8883 479.00 474.00 5.00 306395 ZEP 2010 09 23 07 10 00 2098-99 P co CCGG 117.390 -999.990 ... V2 2010 10 27 14 41 00 78.9067 11.8883 479.00 474.00 5.00 306396 ZEP 2010 09 30 08 16 00 525-99 P co CCGG 112.100 -999.990 N.. V2 2010 10 27 13 55 00 78.9067 11.8883 479.00 474.00 5.00 306393 ZEP 2010 09 30 08 16 00 526-99 P co CCGG 111.540 -999.990 N.. V2 2010 10 27 14 10 00 78.9067 11.8883 479.00 474.00 5.00 306394 ZEP 2010 10 07 07 57 00 5191-99 P co CCGG 126.570 -999.990 N.. R5 2010 10 27 14 58 00 78.9067 11.8883 479.00 474.00 5.00 306383 ZEP 2010 10 07 07 57 00 5192-99 P co CCGG 130.760 -999.990 N.. R5 2010 10 27 15 13 00 78.9067 11.8883 479.00 474.00 5.00 306384 ZEP 2010 10 14 08 22 00 5077-99 P co CCGG 123.270 -999.990 N.. R5 2010 10 27 15 27 00 78.9067 11.8883 479.00 474.00 5.00 306385 ZEP 2010 10 14 08 22 00 5078-99 P co CCGG 124.870 -999.990 N.. R5 2010 10 27 15 42 00 78.9067 11.8883 479.00 474.00 5.00 306386 ZEP 2010 10 22 08 28 00 1955-99 P co CCGG 134.000 -999.990 N.. R5 2010 11 22 11 50 00 78.9067 11.8883 479.00 474.00 5.00 308031 ZEP 2010 10 22 08 28 00 1956-99 P co CCGG 131.660 -999.990 N.. R5 2010 11 22 12 05 00 78.9067 11.8883 479.00 474.00 5.00 308032 ZEP 2010 10 28 08 26 00 4297-99 P co CCGG 128.420 -999.990 N.. R5 2010 11 22 11 21 00 78.9067 11.8883 479.00 474.00 5.00 308029 ZEP 2010 10 28 08 26 00 4298-99 P co CCGG 130.610 -999.990 N.. R5 2010 11 22 11 35 00 78.9067 11.8883 479.00 474.00 5.00 308030 ZEP 2010 11 25 10 13 00 4871-99 P co CCGG 124.320 -999.990 ... V2 2010 12 30 13 05 00 78.9067 11.8883 479.00 474.00 5.00 310106 ZEP 2010 11 25 10 13 00 4872-99 P co CCGG 124.360 -999.990 ... V2 2010 12 30 13 21 00 78.9067 11.8883 479.00 474.00 5.00 310107 ZEP 2010 12 02 11 54 00 2627-99 P co CCGG 120.610 -999.990 ... R5 2011 01 03 11 37 00 78.9067 11.8883 479.00 474.00 5.00 310108 ZEP 2010 12 02 11 54 00 2628-99 P co CCGG 120.230 -999.990 ... R5 2011 01 03 11 51 00 78.9067 11.8883 479.00 474.00 5.00 310109 ZEP 2010 12 10 10 15 00 1055-99 P co CCGG 126.270 -999.990 ... V2 2011 01 04 12 01 00 78.9067 11.8883 479.00 474.00 5.00 310275 ZEP 2010 12 10 10 15 00 1056-99 P co CCGG 126.750 -999.990 ... V2 2011 01 04 12 17 00 78.9067 11.8883 479.00 474.00 5.00 310276 ZEP 2010 12 16 13 27 00 2715-99 P co CCGG 126.840 -999.990 ... V2 2011 01 04 11 28 00 78.9067 11.8883 479.00 474.00 5.00 310273 ZEP 2010 12 16 13 27 00 2716-99 P co CCGG 126.260 -999.990 ... V2 2011 01 04 11 45 00 78.9067 11.8883 479.00 474.00 5.00 310274 ZEP 2010 12 23 09 25 00 295-99 P co CCGG 125.340 -999.990 ... R5 2011 01 18 12 15 00 78.9067 11.8883 479.00 474.00 5.00 311038 ZEP 2010 12 23 09 25 00 296-99 P co CCGG 125.560 -999.990 ... R5 2011 01 18 12 30 00 78.9067 11.8883 479.00 474.00 5.00 311039 ZEP 2010 12 30 10 55 00 3013-99 P co CCGG 130.350 -999.990 ... R5 2011 01 18 12 45 00 78.9067 11.8883 479.00 474.00 5.00 311040 ZEP 2010 12 30 10 55 00 3014-99 P co CCGG 130.430 -999.990 ... R5 2011 01 18 12 59 00 78.9067 11.8883 479.00 474.00 5.00 311041 ZEP 2011 01 06 10 10 00 811-91 P co CCGG 150.020 -999.990 ... V4 2011 02 18 14 40 00 78.9067 11.8883 479.00 474.00 5.00 312708 ZEP 2011 01 06 10 10 00 812-91 P co CCGG 149.580 -999.990 ... V4 2011 02 18 14 55 00 78.9067 11.8883 479.00 474.00 5.00 312709 ZEP 2011 01 13 09 45 00 749-99 P co CCGG 143.730 -999.990 ... V2 2011 02 18 14 40 00 78.9067 11.8883 479.00 474.00 5.00 312710 ZEP 2011 01 13 09 45 00 750-99 P co CCGG 143.690 -999.990 ... V2 2011 02 18 14 56 00 78.9067 11.8883 479.00 474.00 5.00 312711 ZEP 2011 01 21 10 04 00 3927-99 P co CCGG 151.140 -999.990 ... V2 2011 02 16 11 22 00 78.9067 11.8883 479.00 474.00 5.00 312533 ZEP 2011 01 21 10 04 00 3928-99 P co CCGG 151.610 -999.990 ... V2 2011 02 16 11 38 00 78.9067 11.8883 479.00 474.00 5.00 312534 ZEP 2011 01 27 08 35 00 811-99 P co CCGG 144.300 -999.990 ... V2 2011 02 16 11 54 00 78.9067 11.8883 479.00 474.00 5.00 312535 ZEP 2011 01 27 08 35 00 812-99 P co CCGG 144.190 -999.990 ... V2 2011 02 16 12 10 00 78.9067 11.8883 479.00 474.00 5.00 312536 ZEP 2011 02 03 08 36 00 5137-99 P co CCGG 147.360 -999.990 ... V2 2011 03 15 14 09 00 78.9067 11.8883 479.00 474.00 5.00 314136 ZEP 2011 02 03 08 36 00 5138-99 P co CCGG 147.420 -999.990 ... V2 2011 03 15 14 25 00 78.9067 11.8883 479.00 474.00 5.00 314137 ZEP 2011 02 10 14 00 00 5103-99 P co CCGG 145.250 -999.990 ... V2 2011 03 15 14 41 00 78.9067 11.8883 479.00 474.00 5.00 314134 ZEP 2011 02 10 14 00 00 5104-99 P co CCGG 145.120 -999.990 ... V2 2011 03 15 14 57 00 78.9067 11.8883 479.00 474.00 5.00 314135 ZEP 2011 02 17 09 30 00 1433-99 P co CCGG 148.310 -999.990 ... V2 2011 03 16 11 24 00 78.9067 11.8883 479.00 474.00 5.00 314152 ZEP 2011 02 17 09 30 00 1434-99 P co CCGG 148.310 -999.990 ... V2 2011 03 16 11 41 00 78.9067 11.8883 479.00 474.00 5.00 314153 ZEP 2011 02 24 09 05 00 4809-99 P co CCGG 143.790 -999.990 ... V2 2011 03 16 10 52 00 78.9067 11.8883 479.00 474.00 5.00 314150 ZEP 2011 02 24 09 05 00 4810-99 P co CCGG 144.310 -999.990 ... V2 2011 03 16 11 08 00 78.9067 11.8883 479.00 474.00 5.00 314151 ZEP 2011 03 03 14 42 00 3583-99 P co CCGG 149.810 -999.990 ... V2 2011 04 04 14 16 00 78.9067 11.8883 479.00 474.00 5.00 315304 ZEP 2011 03 03 14 42 00 3584-99 P co CCGG 150.180 -999.990 ... V2 2011 04 04 14 32 00 78.9067 11.8883 479.00 474.00 5.00 315305 ZEP 2011 03 10 15 50 00 971-99 P co CCGG 156.420 -999.990 ... V2 2011 04 04 13 11 00 78.9067 11.8883 479.00 474.00 5.00 315302 ZEP 2011 03 10 15 50 00 972-99 P co CCGG 156.410 -999.990 ... V2 2011 04 04 13 27 00 78.9067 11.8883 479.00 474.00 5.00 315303 ZEP 2011 03 25 09 12 00 739-91 P co CCGG 154.870 -999.990 ... V2 2011 05 19 13 57 00 78.9067 11.8883 479.00 474.00 5.00 317873 ZEP 2011 03 25 09 12 00 740-91 P co CCGG 154.780 -999.990 ... V2 2011 05 19 14 13 00 78.9067 11.8883 479.00 474.00 5.00 317874 ZEP 2011 03 31 07 40 00 1257-99 P co CCGG 151.100 -999.990 ... V4 2011 05 04 11 50 00 78.9067 11.8883 479.00 474.00 5.00 317138 ZEP 2011 03 31 07 40 00 1258-99 P co CCGG 151.800 -999.990 ... V4 2011 05 04 12 05 00 78.9067 11.8883 479.00 474.00 5.00 317139 ZEP 2011 03 31 07 52 00 801-91 P co CCGG 151.610 -999.990 ... V2 2011 05 19 13 24 00 78.9067 11.8883 479.00 474.00 5.00 317871 ZEP 2011 03 31 07 52 00 802-91 P co CCGG 150.680 -999.990 ... V2 2011 05 19 13 40 00 78.9067 11.8883 479.00 474.00 5.00 317872 ZEP 2011 04 08 09 28 00 779-99 P co CCGG 145.530 -999.990 ... V4 2011 05 04 12 20 00 78.9067 11.8883 479.00 474.00 5.00 317136 ZEP 2011 04 08 09 28 00 780-99 P co CCGG 144.640 -999.990 ... V4 2011 05 04 12 36 00 78.9067 11.8883 479.00 474.00 5.00 317137 ZEP 2011 04 14 08 19 00 2713-99 P co CCGG 150.630 -999.990 ... V2 2011 05 19 17 12 00 78.9067 11.8883 479.00 474.00 5.00 317867 ZEP 2011 04 14 08 19 00 2714-99 P co CCGG 150.440 -999.990 ... V2 2011 05 19 17 28 00 78.9067 11.8883 479.00 474.00 5.00 317868 ZEP 2011 04 22 10 41 00 3981-99 P co CCGG 146.990 -999.990 ... V2 2011 05 19 16 40 00 78.9067 11.8883 479.00 474.00 5.00 317865 ZEP 2011 04 22 10 41 00 3982-99 P co CCGG 146.800 -999.990 ... V2 2011 05 19 16 56 00 78.9067 11.8883 479.00 474.00 5.00 317866 ZEP 2011 04 28 09 05 00 4567-99 P co CCGG 144.230 -999.990 ... V4 2011 06 02 10 57 00 78.9067 11.8883 479.00 474.00 5.00 318411 ZEP 2011 04 28 09 05 00 4568-99 P co CCGG 144.060 -999.990 ... V4 2011 06 02 11 13 00 78.9067 11.8883 479.00 474.00 5.00 318412 ZEP 2011 05 06 14 44 00 3823-99 P co CCGG 136.150 -999.990 ... V4 2011 06 02 11 59 00 78.9067 11.8883 479.00 474.00 5.00 318413 ZEP 2011 05 12 12 40 00 803-91 P co CCGG 135.960 -999.990 ... V4 2011 06 10 14 12 00 78.9067 11.8883 479.00 474.00 5.00 319060 ZEP 2011 05 12 12 40 00 804-91 P co CCGG 133.150 -999.990 ... V4 2011 06 10 14 27 00 78.9067 11.8883 479.00 474.00 5.00 319061 ZEP 2011 05 20 08 20 00 4989-99 P co CCGG 129.680 -999.990 ... V4 2011 06 10 14 43 00 78.9067 11.8883 479.00 474.00 5.00 319058 ZEP 2011 05 20 08 20 00 4990-99 P co CCGG 129.230 -999.990 ... V4 2011 06 10 14 58 00 78.9067 11.8883 479.00 474.00 5.00 319059 ZEP 2011 05 27 09 40 00 5365-99 P co CCGG 119.900 -999.990 ... V2 2011 06 20 13 17 00 78.9067 11.8883 479.00 474.00 5.00 319421 ZEP 2011 05 27 09 40 00 5366-99 P co CCGG 119.580 -999.990 ... V2 2011 06 20 13 33 00 78.9067 11.8883 479.00 474.00 5.00 319422 ZEP 2011 06 02 10 40 00 5363-99 P co CCGG 114.170 -999.990 ... V2 2011 06 20 12 44 00 78.9067 11.8883 479.00 474.00 5.00 319423 ZEP 2011 06 02 10 40 00 5364-99 P co CCGG 114.240 -999.990 ... V2 2011 06 20 13 00 00 78.9067 11.8883 479.00 474.00 5.00 319424 ZEP 2011 06 09 09 29 00 2635-99 P co CCGG 104.670 -999.990 ... V4 2011 07 12 12 36 00 78.9067 11.8883 479.00 474.00 5.00 320224 ZEP 2011 06 09 09 29 00 2636-99 P co CCGG 104.490 -999.990 ... V4 2011 07 12 12 51 00 78.9067 11.8883 479.00 474.00 5.00 320225 ZEP 2011 06 16 08 45 00 4125-99 P co CCGG 94.680 -999.990 ... V4 2011 07 12 13 07 00 78.9067 11.8883 479.00 474.00 5.00 320222 ZEP 2011 06 16 08 45 00 4126-99 P co CCGG 93.970 -999.990 ... V4 2011 07 12 13 22 00 78.9067 11.8883 479.00 474.00 5.00 320223 ZEP 2011 06 23 08 59 00 405-99 P co CCGG 96.550 -999.990 ... V4 2011 07 19 14 28 00 78.9067 11.8883 479.00 474.00 5.00 320511 ZEP 2011 06 23 08 59 00 406-99 P co CCGG 96.740 -999.990 ... V4 2011 07 19 14 44 00 78.9067 11.8883 479.00 474.00 5.00 320512 ZEP 2011 06 30 08 05 00 2067-99 P co CCGG 98.250 -999.990 ... V4 2011 07 19 13 58 00 78.9067 11.8883 479.00 474.00 5.00 320509 ZEP 2011 06 30 08 05 00 2068-99 P co CCGG 98.760 -999.990 ... V4 2011 07 19 14 13 00 78.9067 11.8883 479.00 474.00 5.00 320510 ZEP 2011 07 07 08 21 00 4783-99 P co CCGG 87.190 -999.990 ... V4 2011 07 28 17 15 00 78.9067 11.8883 479.00 474.00 5.00 321398 ZEP 2011 07 07 08 21 00 4784-99 P co CCGG 88.160 -999.990 ... V4 2011 07 28 17 30 00 78.9067 11.8883 479.00 474.00 5.00 321399 ZEP 2011 07 14 07 47 00 3641-99 P co CCGG 82.160 -999.990 ... V4 2011 07 28 16 44 00 78.9067 11.8883 479.00 474.00 5.00 321396 ZEP 2011 07 14 07 47 00 3642-99 P co CCGG 82.270 -999.990 ... V4 2011 07 28 17 00 00 78.9067 11.8883 479.00 474.00 5.00 321397 ZEP 2011 07 22 07 05 00 867-99 P co CCGG 82.680 -999.990 ... V2 2011 09 06 15 17 00 78.9067 11.8883 479.00 474.00 5.00 323105 ZEP 2011 07 22 07 05 00 868-99 P co CCGG 82.730 -999.990 ... V2 2011 09 06 15 33 00 78.9067 11.8883 479.00 474.00 5.00 323106 ZEP 2011 07 28 07 24 00 79-99 P co CCGG 83.040 -999.990 ... V2 2011 09 06 14 44 00 78.9067 11.8883 479.00 474.00 5.00 323103 ZEP 2011 07 28 07 24 00 80-99 P co CCGG 81.860 -999.990 ... V2 2011 09 06 15 01 00 78.9067 11.8883 479.00 474.00 5.00 323104 ZEP 2011 08 04 12 30 00 2735-99 P co CCGG 79.490 -999.990 ... V2 2011 09 06 16 22 00 78.9067 11.8883 479.00 474.00 5.00 323067 ZEP 2011 08 04 12 30 00 2736-99 P co CCGG 79.200 -999.990 ... V2 2011 09 06 16 38 00 78.9067 11.8883 479.00 474.00 5.00 323068 ZEP 2011 08 11 08 07 00 4017-99 P co CCGG 82.150 -999.990 ... V2 2011 09 06 15 49 00 78.9067 11.8883 479.00 474.00 5.00 323069 ZEP 2011 08 11 08 07 00 4018-99 P co CCGG 82.130 -999.990 ... V2 2011 09 06 16 05 00 78.9067 11.8883 479.00 474.00 5.00 323070 ZEP 2011 08 18 09 25 00 1079-99 P co CCGG 85.830 -999.990 ... V4 2011 09 14 12 36 00 78.9067 11.8883 479.00 474.00 5.00 323422 ZEP 2011 08 18 09 25 00 1080-99 P co CCGG 86.350 -999.990 ... V4 2011 09 14 12 51 00 78.9067 11.8883 479.00 474.00 5.00 323423 ZEP 2011 08 25 07 44 00 297-99 P co CCGG 82.440 -999.990 ... V4 2011 09 14 13 06 00 78.9067 11.8883 479.00 474.00 5.00 323420 ZEP 2011 08 25 07 44 00 298-99 P co CCGG 83.380 -999.990 ... V4 2011 09 14 13 21 00 78.9067 11.8883 479.00 474.00 5.00 323421 ZEP 2011 09 02 09 24 00 5315-99 P co CCGG 83.370 -999.990 ... V2 2011 10 06 12 17 00 78.9067 11.8883 479.00 474.00 5.00 324622 ZEP 2011 09 02 09 24 00 5348-99 P co CCGG 83.820 -999.990 ... V2 2011 10 06 12 01 00 78.9067 11.8883 479.00 474.00 5.00 324623 ZEP 2011 09 08 09 58 00 5316-99 P co CCGG 89.010 -999.990 ... V2 2011 10 06 11 44 00 78.9067 11.8883 479.00 474.00 5.00 324621 ZEP 2011 09 08 09 58 00 5347-99 P co CCGG 89.630 -999.990 ... V2 2011 10 06 11 28 00 78.9067 11.8883 479.00 474.00 5.00 324620 ZEP 2011 09 16 08 15 00 5301-99 P co CCGG 87.320 -999.990 ... V4 2011 11 08 16 28 00 78.9067 11.8883 479.00 474.00 5.00 326208 ZEP 2011 09 16 08 15 00 5302-99 P co CCGG 87.620 -999.990 ... V4 2011 11 08 16 43 00 78.9067 11.8883 479.00 474.00 5.00 326209 ZEP 2011 09 23 07 47 00 1535-99 P co CCGG 96.480 -999.990 ... V4 2011 11 08 15 57 00 78.9067 11.8883 479.00 474.00 5.00 326210 ZEP 2011 09 23 07 47 00 1536-99 P co CCGG 95.980 -999.990 ... V4 2011 11 08 16 12 00 78.9067 11.8883 479.00 474.00 5.00 326211 ZEP 2011 09 29 18 30 00 5385-99 P co CCGG 94.140 -999.990 ... V4 2011 11 08 15 27 00 78.9067 11.8883 479.00 474.00 5.00 326206 ZEP 2011 09 29 18 30 00 5386-99 P co CCGG 93.340 -999.990 ... V4 2011 11 08 15 42 00 78.9067 11.8883 479.00 474.00 5.00 326207 ZEP 2011 10 06 16 23 00 1863-99 P co CCGG 96.350 -999.990 ... V4 2011 11 08 14 56 00 78.9067 11.8883 479.00 474.00 5.00 326204 ZEP 2011 10 06 16 23 00 1864-99 P co CCGG 96.160 -999.990 ... V4 2011 11 08 15 11 00 78.9067 11.8883 479.00 474.00 5.00 326205 ZEP 2011 10 13 08 37 00 5185-99 P co CCGG 98.050 -999.990 ... V4 2011 12 06 12 44 00 78.9067 11.8883 479.00 474.00 5.00 327399 ZEP 2011 10 13 08 37 00 5186-99 P co CCGG 98.690 -999.990 ... V4 2011 12 06 12 59 00 78.9067 11.8883 479.00 474.00 5.00 327400 ZEP 2011 10 20 07 55 00 1707-99 P co CCGG 98.460 -999.990 ... V4 2011 12 06 12 13 00 78.9067 11.8883 479.00 474.00 5.00 327401 ZEP 2011 10 20 07 55 00 1708-99 P co CCGG 99.120 -999.990 ... V4 2011 12 06 12 28 00 78.9067 11.8883 479.00 474.00 5.00 327402 ZEP 2011 10 27 07 40 00 479-99 P co CCGG 126.650 -999.990 .X. V4 2011 12 06 11 43 00 78.9067 11.8883 479.00 474.00 5.00 327395 ZEP 2011 10 27 07 40 00 480-99 P co CCGG 126.560 -999.990 .X. V4 2011 12 06 11 58 00 78.9067 11.8883 479.00 474.00 5.00 327396 ZEP 2011 11 03 08 30 00 1221-99 P co CCGG 108.690 -999.990 ... V4 2011 12 06 11 12 00 78.9067 11.8883 479.00 474.00 5.00 327397 ZEP 2011 11 03 08 30 00 1222-99 P co CCGG 108.830 -999.990 ... V4 2011 12 06 11 27 00 78.9067 11.8883 479.00 474.00 5.00 327398 ZEP 2011 11 10 09 55 00 4825-99 P co CCGG 110.310 -999.990 ... V4 2011 12 13 13 46 00 78.9067 11.8883 479.00 474.00 5.00 327605 ZEP 2011 11 10 09 55 00 4826-99 P co CCGG 110.020 -999.990 ... V4 2011 12 13 14 01 00 78.9067 11.8883 479.00 474.00 5.00 327606 ZEP 2011 11 17 09 45 00 165-99 P co CCGG 117.210 -999.990 ... V4 2011 12 13 14 16 00 78.9067 11.8883 479.00 474.00 5.00 327603 ZEP 2011 11 17 09 45 00 166-99 P co CCGG 117.580 -999.990 ... V4 2011 12 13 14 32 00 78.9067 11.8883 479.00 474.00 5.00 327604 ZEP 2011 11 24 09 17 00 4297-99 P co CCGG 123.520 -999.990 ... V4 2011 12 29 15 22 00 78.9067 11.8883 479.00 474.00 5.00 328239 ZEP 2011 11 24 09 17 00 4298-99 P co CCGG 123.790 -999.990 ... V4 2011 12 29 15 38 00 78.9067 11.8883 479.00 474.00 5.00 328240 ZEP 2011 12 01 15 26 00 4385-99 P co CCGG 146.370 -999.990 .X. V4 2011 12 29 14 52 00 78.9067 11.8883 479.00 474.00 5.00 328241 ZEP 2011 12 01 15 26 00 4386-99 P co CCGG 145.850 -999.990 .X. V4 2011 12 29 15 07 00 78.9067 11.8883 479.00 474.00 5.00 328242 ZEP 2011 12 08 08 08 00 4503-91 P co CCGG 135.360 -999.990 ... V4 2012 01 13 12 55 00 78.9067 11.8883 479.00 474.00 5.00 329301 ZEP 2011 12 08 08 08 00 4504-91 P co CCGG 134.640 -999.990 ... V4 2012 01 13 13 11 00 78.9067 11.8883 479.00 474.00 5.00 329302 ZEP 2011 12 15 09 00 00 4371-91 P co CCGG 131.030 -999.990 ... V4 2012 01 13 12 25 00 78.9067 11.8883 479.00 474.00 5.00 329299 ZEP 2011 12 15 09 00 00 4372-91 P co CCGG 130.860 -999.990 ... V4 2012 01 13 12 40 00 78.9067 11.8883 479.00 474.00 5.00 329300 ZEP 2011 12 26 12 25 00 4907-91 P co CCGG 127.960 -999.990 ... V4 2012 01 24 15 15 00 78.9067 11.8883 479.00 474.00 5.00 329756 ZEP 2011 12 26 12 25 00 4908-91 P co CCGG 127.380 -999.990 ... V4 2012 01 24 15 31 00 78.9067 11.8883 479.00 474.00 5.00 329757 ZEP 2011 12 28 09 14 00 23-98 P co CCGG 147.980 -999.990 ... V4 2012 01 24 14 45 00 78.9067 11.8883 479.00 474.00 5.00 329754 ZEP 2011 12 28 09 14 00 24-98 P co CCGG 147.850 -999.990 ... V4 2012 01 24 15 00 00 78.9067 11.8883 479.00 474.00 5.00 329755 ZEP 2012 01 19 10 23 00 4925-91 P co CCGG 128.060 -999.990 ... V4 2012 02 28 13 20 00 78.9067 11.8883 479.00 474.00 5.00 331531 ZEP 2012 01 19 10 23 00 4926-91 P co CCGG 127.680 -999.990 ... V4 2012 02 28 13 35 00 78.9067 11.8883 479.00 474.00 5.00 331532 ZEP 2012 01 26 08 45 00 735-91 P co CCGG 154.680 -999.990 ... V4 2012 02 28 13 50 00 78.9067 11.8883 479.00 474.00 5.00 331533 ZEP 2012 01 26 08 45 00 736-91 P co CCGG 155.230 -999.990 ... V4 2012 02 28 14 05 00 78.9067 11.8883 479.00 474.00 5.00 331534 ZEP 2012 02 02 09 25 00 781-91 P co CCGG 129.430 -999.990 ... V4 2012 03 09 12 06 00 78.9067 11.8883 479.00 474.00 5.00 332169 ZEP 2012 02 02 09 25 00 782-91 P co CCGG 128.880 -999.990 ... V4 2012 03 09 12 21 00 78.9067 11.8883 479.00 474.00 5.00 332170 ZEP 2012 02 09 09 22 00 789-91 P co CCGG 129.590 -999.990 ... V4 2012 03 09 11 35 00 78.9067 11.8883 479.00 474.00 5.00 332171 ZEP 2012 02 09 09 22 00 790-91 P co CCGG 128.720 -999.990 ... V4 2012 03 09 11 50 00 78.9067 11.8883 479.00 474.00 5.00 332172 ZEP 2012 02 16 08 30 00 805-91 P co CCGG 145.620 -999.990 ... V4 2012 04 06 14 08 00 78.9067 11.8883 479.00 474.00 5.00 333617 ZEP 2012 02 16 08 30 00 806-91 P co CCGG 145.450 -999.990 ... V4 2012 04 06 14 23 00 78.9067 11.8883 479.00 474.00 5.00 333618 ZEP 2012 02 23 09 30 00 815-91 P co CCGG 178.360 -999.990 .X. V4 2012 04 09 14 14 00 78.9067 11.8883 479.00 474.00 5.00 333615 ZEP 2012 02 23 09 30 00 816-91 P co CCGG 177.860 -999.990 .X. V4 2012 04 09 14 29 00 78.9067 11.8883 479.00 474.00 5.00 333616 ZEP 2012 03 01 09 40 00 4007-91 P co CCGG 165.170 -999.990 ... V2 2012 05 10 11 16 00 78.9067 11.8883 479.00 474.00 5.00 334617 ZEP 2012 03 01 09 40 00 4008-91 P co CCGG 165.010 -999.990 ... V2 2012 05 10 11 32 00 78.9067 11.8883 479.00 474.00 5.00 334618 ZEP 2012 03 08 09 55 00 785-91 P co CCGG 154.780 -999.990 ... V2 2012 05 10 10 43 00 78.9067 11.8883 479.00 474.00 5.00 334619 ZEP 2012 03 08 09 55 00 786-91 P co CCGG 156.110 -999.990 ... V2 2012 05 10 11 00 00 78.9067 11.8883 479.00 474.00 5.00 334620 ZEP 2012 03 15 13 53 00 3163-99 P co CCGG 154.700 -999.990 ... V4 2012 04 13 14 50 00 78.9067 11.8883 479.00 474.00 5.00 333874 ZEP 2012 03 15 13 53 00 3164-99 P co CCGG 156.720 -999.990 ... V4 2012 04 13 15 05 00 78.9067 11.8883 479.00 474.00 5.00 333875 ZEP 2012 03 22 08 42 00 3783-99 P co CCGG 154.990 -999.990 ... V4 2012 04 13 14 19 00 78.9067 11.8883 479.00 474.00 5.00 333876 ZEP 2012 03 22 08 42 00 3784-99 P co CCGG 154.750 -999.990 ... V4 2012 04 13 14 34 00 78.9067 11.8883 479.00 474.00 5.00 333877 ZEP 2012 03 29 07 32 00 3923-99 P co CCGG 154.280 -999.990 ... V4 2012 05 14 14 36 00 78.9067 11.8883 479.00 474.00 5.00 335042 ZEP 2012 03 29 07 32 00 3924-99 P co CCGG 154.570 -999.990 ... V4 2012 05 14 14 52 00 78.9067 11.8883 479.00 474.00 5.00 335043 ZEP 2012 04 04 08 19 00 5307-99 P co CCGG 153.560 -999.990 ... V4 2012 05 14 14 06 00 78.9067 11.8883 479.00 474.00 5.00 335044 ZEP 2012 04 04 08 19 00 5308-99 P co CCGG 152.720 -999.990 ... V4 2012 05 14 14 21 00 78.9067 11.8883 479.00 474.00 5.00 335045 ZEP 2012 04 11 07 58 00 6023-66 P co CCGG 157.580 -999.990 ... V4 2012 05 14 10 02 00 78.9067 11.8883 479.00 474.00 5.00 335104 ZEP 2012 04 11 07 58 00 6024-66 P co CCGG 157.680 -999.990 ... V4 2012 05 14 10 17 00 78.9067 11.8883 479.00 474.00 5.00 335105 ZEP 2012 04 19 14 38 00 4881-99 P co CCGG 154.410 -999.990 ... V4 2012 05 14 10 32 00 78.9067 11.8883 479.00 474.00 5.00 335106 ZEP 2012 04 19 14 38 00 4882-99 P co CCGG 153.680 -999.990 ... V4 2012 05 14 10 48 00 78.9067 11.8883 479.00 474.00 5.00 335107 ZEP 2012 04 27 08 10 00 2855-99 P co CCGG 149.090 -999.990 ... V2 2012 05 30 13 31 00 78.9067 11.8883 479.00 474.00 5.00 336050 ZEP 2012 04 27 08 10 00 2856-99 P co CCGG 148.790 -999.990 ... V2 2012 05 30 13 47 00 78.9067 11.8883 479.00 474.00 5.00 336051 ZEP 2012 05 03 08 35 00 1521-99 P co CCGG 148.950 -999.990 ... V2 2012 05 30 12 58 00 78.9067 11.8883 479.00 474.00 5.00 336048 ZEP 2012 05 03 08 35 00 1522-99 P co CCGG 148.720 -999.990 ... V2 2012 05 30 13 15 00 78.9067 11.8883 479.00 474.00 5.00 336049 ZEP 2012 05 11 14 55 00 4253-99 P co CCGG 137.300 -999.990 ... V4 2012 06 19 15 11 00 78.9067 11.8883 479.00 474.00 5.00 337025 ZEP 2012 05 11 14 55 00 4254-99 P co CCGG 138.840 -999.990 ... V4 2012 06 19 15 26 00 78.9067 11.8883 479.00 474.00 5.00 337026 ZEP 2012 05 18 08 47 00 3467-99 P co CCGG 131.470 -999.990 ... V4 2012 06 19 14 40 00 78.9067 11.8883 479.00 474.00 5.00 337027 ZEP 2012 05 18 08 47 00 3468-99 P co CCGG 132.220 -999.990 ... V4 2012 06 19 14 55 00 78.9067 11.8883 479.00 474.00 5.00 337028 ZEP 2012 05 24 08 34 00 217-99 P co CCGG 125.430 -999.990 ... V4 2012 07 23 12 47 00 78.9067 11.8883 479.00 474.00 5.00 338147 ZEP 2012 05 24 08 34 00 218-99 P co CCGG 124.910 -999.990 ... V4 2012 07 23 13 03 00 78.9067 11.8883 479.00 474.00 5.00 338148 ZEP 2012 06 01 08 55 00 383-99 P co CCGG 119.080 -999.990 N.. V4 2012 07 23 13 18 00 78.9067 11.8883 479.00 474.00 5.00 338145 ZEP 2012 06 01 08 55 00 384-99 P co CCGG 115.270 -999.990 ... V4 2012 07 23 13 33 00 78.9067 11.8883 479.00 474.00 5.00 338146 ZEP 2012 06 07 09 36 00 643-91 P co CCGG 108.920 -999.990 ... V4 2012 07 20 13 27 00 78.9067 11.8883 479.00 474.00 5.00 338312 ZEP 2012 06 07 09 36 00 644-91 P co CCGG 109.310 -999.990 ... V4 2012 07 20 13 42 00 78.9067 11.8883 479.00 474.00 5.00 338313 ZEP 2012 06 14 12 38 00 1713-91 P co CCGG 102.280 -999.990 ... V4 2012 07 20 12 56 00 78.9067 11.8883 479.00 474.00 5.00 338314 ZEP 2012 06 14 12 38 00 1714-91 P co CCGG 102.380 -999.990 ... V4 2012 07 20 13 11 00 78.9067 11.8883 479.00 474.00 5.00 338315 ZEP 2012 06 21 08 35 00 433-99 P co CCGG 94.350 -999.990 ... V4 2012 07 30 14 19 00 78.9067 11.8883 479.00 474.00 5.00 338622 ZEP 2012 06 21 08 35 00 434-99 P co CCGG 94.230 -999.990 ... V4 2012 07 30 14 34 00 78.9067 11.8883 479.00 474.00 5.00 338623 ZEP 2012 06 28 08 00 00 4311-99 P co CCGG 88.900 -999.990 ... V4 2012 07 31 08 36 00 78.9067 11.8883 479.00 474.00 5.00 338624 ZEP 2012 06 28 08 00 00 4312-99 P co CCGG 89.380 -999.990 ... V4 2012 07 31 08 51 00 78.9067 11.8883 479.00 474.00 5.00 338625 ZEP 2012 07 03 13 58 00 13-99 P co CCGG 87.270 -999.990 ... V4 2012 07 26 15 41 00 78.9067 11.8883 479.00 474.00 5.00 338669 ZEP 2012 07 03 13 58 00 14-99 P co CCGG 86.720 -999.990 ... V4 2012 07 26 15 57 00 78.9067 11.8883 479.00 474.00 5.00 338670 ZEP 2012 07 05 08 10 00 5165-99 P co CCGG 85.360 -999.990 ... V4 2012 07 26 16 12 00 78.9067 11.8883 479.00 474.00 5.00 338667 ZEP 2012 07 05 08 10 00 5166-99 P co CCGG 85.400 -999.990 ... V4 2012 07 26 16 27 00 78.9067 11.8883 479.00 474.00 5.00 338668 ZEP 2012 07 12 08 20 00 5075-99 P co CCGG 96.040 -999.990 ... V4 2012 08 17 14 10 00 78.9067 11.8883 479.00 474.00 5.00 339421 ZEP 2012 07 12 08 20 00 5076-99 P co CCGG 95.250 -999.990 ... V4 2012 08 17 14 25 00 78.9067 11.8883 479.00 474.00 5.00 339422 ZEP 2012 07 19 07 59 00 4649-99 P co CCGG 87.650 -999.990 ... V4 2012 08 20 10 49 00 78.9067 11.8883 479.00 474.00 5.00 339419 ZEP 2012 07 19 07 59 00 4650-99 P co CCGG 87.140 -999.990 ... V4 2012 08 20 11 04 00 78.9067 11.8883 479.00 474.00 5.00 339420 ZEP 2012 07 26 07 40 00 195-99 P co CCGG 87.810 -999.990 ... V4 2012 09 05 11 44 00 78.9067 11.8883 479.00 474.00 5.00 340143 ZEP 2012 07 26 07 40 00 196-99 P co CCGG 88.370 -999.990 ... V4 2012 09 05 11 59 00 78.9067 11.8883 479.00 474.00 5.00 340144 ZEP 2012 08 02 08 26 00 2285-99 P co CCGG 90.700 -999.990 ... V4 2012 09 05 12 15 00 78.9067 11.8883 479.00 474.00 5.00 340141 ZEP 2012 08 02 08 26 00 2286-99 P co CCGG 91.040 -999.990 ... V4 2012 09 05 12 30 00 78.9067 11.8883 479.00 474.00 5.00 340142 ZEP 2012 08 09 08 24 00 5301-99 P co CCGG 108.630 -999.990 ... V4 2012 10 03 11 13 00 78.9067 11.8883 479.00 474.00 5.00 341682 ZEP 2012 08 09 08 24 00 5302-99 P co CCGG 107.560 -999.990 ... V4 2012 10 03 11 28 00 78.9067 11.8883 479.00 474.00 5.00 341683 ZEP 2012 08 16 08 23 00 5133-99 P co CCGG 103.010 -999.990 ... V4 2012 10 03 11 44 00 78.9067 11.8883 479.00 474.00 5.00 341680 ZEP 2012 08 16 08 23 00 5134-99 P co CCGG 102.030 -999.990 ... V4 2012 10 03 11 59 00 78.9067 11.8883 479.00 474.00 5.00 341681 ZEP 2012 08 23 08 57 00 525-99 P co CCGG 122.050 -999.990 ... V4 2012 09 24 13 23 00 78.9067 11.8883 479.00 474.00 5.00 341239 ZEP 2012 08 23 08 57 00 526-99 P co CCGG 122.760 -999.990 ... V4 2012 09 24 13 39 00 78.9067 11.8883 479.00 474.00 5.00 341240 ZEP 2012 08 30 08 30 00 1909-99 P co CCGG 129.600 -999.990 ... V4 2012 09 24 12 53 00 78.9067 11.8883 479.00 474.00 5.00 341241 ZEP 2012 08 30 08 30 00 1910-99 P co CCGG 127.350 -999.990 ... V4 2012 09 24 13 08 00 78.9067 11.8883 479.00 474.00 5.00 341242 ZEP 2012 09 06 07 56 00 3617-99 P co CCGG 129.540 -999.990 ... V4 2012 10 05 13 26 00 78.9067 11.8883 479.00 474.00 5.00 341961 ZEP 2012 09 06 07 56 00 3618-99 P co CCGG 129.200 -999.990 ... V4 2012 10 05 13 41 00 78.9067 11.8883 479.00 474.00 5.00 341962 ZEP 2012 09 13 08 37 00 3691-99 P co CCGG 127.450 -999.990 ... V4 2012 10 05 12 55 00 78.9067 11.8883 479.00 474.00 5.00 341959 ZEP 2012 09 13 08 37 00 3692-99 P co CCGG 126.960 -999.990 ... V4 2012 10 05 13 10 00 78.9067 11.8883 479.00 474.00 5.00 341960 ZEP 2012 09 20 12 34 56 3841-99 P co CCGG 128.820 -999.990 ... V4 2012 10 30 16 34 00 78.9067 11.8883 479.00 474.00 5.00 342967 ZEP 2012 09 20 12 34 56 3842-99 P co CCGG 127.570 -999.990 ... V4 2012 10 30 16 49 00 78.9067 11.8883 479.00 474.00 5.00 342968 ZEP 2012 09 27 08 17 00 4895-99 P co CCGG 126.690 -999.990 ... V4 2012 10 31 08 50 00 78.9067 11.8883 479.00 474.00 5.00 342969 ZEP 2012 09 27 08 17 00 4896-99 P co CCGG 126.480 -999.990 ... V4 2012 10 31 09 05 00 78.9067 11.8883 479.00 474.00 5.00 342970 ZEP 2012 10 04 09 50 00 1731-99 P co CCGG 122.010 -999.990 ... V4 2012 11 08 13 46 00 78.9067 11.8883 479.00 474.00 5.00 343316 ZEP 2012 10 04 09 50 00 1732-99 P co CCGG 122.140 -999.990 ... V4 2012 11 08 14 02 00 78.9067 11.8883 479.00 474.00 5.00 343317 ZEP 2012 10 11 08 10 00 3261-99 P co CCGG 120.150 -999.990 ... V4 2012 11 08 13 16 00 78.9067 11.8883 479.00 474.00 5.00 343314 ZEP 2012 10 11 08 10 00 3262-99 P co CCGG 119.940 -999.990 ... V4 2012 11 08 13 31 00 78.9067 11.8883 479.00 474.00 5.00 343315 ZEP 2012 10 18 07 58 00 2839-99 P co CCGG 124.170 -999.990 ... V4 2012 11 21 12 02 00 78.9067 11.8883 479.00 474.00 5.00 343976 ZEP 2012 10 18 07 58 00 2840-99 P co CCGG 124.140 -999.990 ... V4 2012 11 21 12 17 00 78.9067 11.8883 479.00 474.00 5.00 343977 ZEP 2012 10 25 09 35 00 27-99 P co CCGG 119.010 -999.990 ... V4 2012 11 21 11 32 00 78.9067 11.8883 479.00 474.00 5.00 343974 ZEP 2012 10 25 09 35 00 28-99 P co CCGG 119.090 -999.990 ... V4 2012 11 21 11 47 00 78.9067 11.8883 479.00 474.00 5.00 343975 ZEP 2012 11 01 10 55 00 373-99 P co CCGG 122.050 -999.990 ... V4 2013 04 25 12 40 00 78.9067 11.8883 479.00 474.00 5.00 350504 ZEP 2012 11 01 10 55 00 374-99 P co CCGG 122.440 -999.990 ... V4 2013 04 25 12 56 00 78.9067 11.8883 479.00 474.00 5.00 350505 ZEP 2012 11 08 09 36 00 17-99 P co CCGG 121.770 -999.990 -.. V4 2013 04 25 13 12 00 78.9067 11.8883 479.00 474.00 5.00 350507 ZEP 2012 11 08 09 36 00 18-99 P co CCGG 128.850 -999.990 +.. V4 2013 04 25 13 28 00 78.9067 11.8883 479.00 474.00 5.00 350506 ZEP 2012 11 16 12 34 56 2087-99 P co CCGG 125.140 -999.990 ... V4 2012 12 20 10 35 00 78.9067 11.8883 479.00 474.00 5.00 345027 ZEP 2012 11 22 09 47 00 629-99 P co CCGG 125.600 -999.990 ... V4 2012 12 20 10 04 00 78.9067 11.8883 479.00 474.00 5.00 345028 ZEP 2012 11 22 09 47 00 630-99 P co CCGG 125.850 -999.990 ... V4 2012 12 20 10 20 00 78.9067 11.8883 479.00 474.00 5.00 345029 ZEP 2012 11 29 10 05 00 5361-99 P co CCGG 122.970 -999.990 ... V4 2013 02 15 09 02 00 78.9067 11.8883 479.00 474.00 5.00 347629 ZEP 2012 11 29 10 05 00 5362-99 P co CCGG 120.890 -999.990 ... V4 2013 02 15 09 17 00 78.9067 11.8883 479.00 474.00 5.00 347630 ZEP 2012 12 06 09 20 00 2159-99 P co CCGG 123.530 -999.990 ... V4 2013 02 14 15 37 00 78.9067 11.8883 479.00 474.00 5.00 347631 ZEP 2012 12 06 09 20 00 2160-99 P co CCGG 121.900 -999.990 ... V4 2013 02 14 15 52 00 78.9067 11.8883 479.00 474.00 5.00 347632 ZEP 2012 12 13 10 07 00 175-99 P co CCGG 172.550 -999.990 .X. V4 2013 01 24 10 45 00 78.9067 11.8883 479.00 474.00 5.00 346520 ZEP 2012 12 13 10 07 00 176-99 P co CCGG 173.540 -999.990 .X. V4 2013 01 24 11 00 00 78.9067 11.8883 479.00 474.00 5.00 346521 ZEP 2012 12 20 10 20 00 135-99 P co CCGG 126.870 -999.990 ... V4 2013 01 24 11 15 00 78.9067 11.8883 479.00 474.00 5.00 346518 ZEP 2012 12 20 10 20 00 136-99 P co CCGG 127.270 -999.990 ... V4 2013 01 24 11 30 00 78.9067 11.8883 479.00 474.00 5.00 346519 ZEP 2012 12 27 08 31 00 1359-99 P co CCGG 132.690 -999.990 ... V4 2013 01 29 15 10 00 78.9067 11.8883 479.00 474.00 5.00 346835 ZEP 2012 12 27 08 31 00 1360-99 P co CCGG 132.170 -999.990 ... V4 2013 01 29 15 25 00 78.9067 11.8883 479.00 474.00 5.00 346836 ZEP 2013 01 03 09 15 00 173-99 P co CCGG 152.830 -999.990 ... V4 2013 01 29 15 40 00 78.9067 11.8883 479.00 474.00 5.00 346833 ZEP 2013 01 03 09 15 00 174-99 P co CCGG 153.880 -999.990 ... V4 2013 01 29 15 56 00 78.9067 11.8883 479.00 474.00 5.00 346834 ZEP 2013 01 11 10 05 00 5109-99 P co CCGG 108.290 -999.990 -.. V4 2013 02 15 09 32 00 78.9067 11.8883 479.00 474.00 5.00 347615 ZEP 2013 01 11 10 05 00 5110-99 P co CCGG 126.650 -999.990 +.. V4 2013 02 15 09 47 00 78.9067 11.8883 479.00 474.00 5.00 347616 ZEP 2013 01 18 11 52 00 405-99 P co CCGG 157.400 -999.990 ... V4 2013 02 15 10 02 00 78.9067 11.8883 479.00 474.00 5.00 347617 ZEP 2013 01 18 11 52 00 406-99 P co CCGG 154.720 -999.990 ... V4 2013 02 15 10 18 00 78.9067 11.8883 479.00 474.00 5.00 347618 ZEP 2013 01 24 10 15 00 2683-99 P co CCGG 162.870 -999.990 ... V2 2013 02 20 14 36 00 78.9067 11.8883 479.00 474.00 5.00 347789 ZEP 2013 01 24 10 15 00 2684-99 P co CCGG 162.540 -999.990 ... V2 2013 02 20 14 52 00 78.9067 11.8883 479.00 474.00 5.00 347790 ZEP 2013 01 31 09 17 00 1677-99 P co CCGG 165.260 -999.990 ... V2 2013 02 20 15 08 00 78.9067 11.8883 479.00 474.00 5.00 347791 ZEP 2013 01 31 09 17 00 1678-99 P co CCGG 167.460 -999.990 ... V2 2013 02 20 15 24 00 78.9067 11.8883 479.00 474.00 5.00 347792 ZEP 2013 02 07 09 50 00 799-91 P co CCGG 185.250 -999.990 .X. V2 2013 03 05 13 18 00 78.9067 11.8883 479.00 474.00 5.00 348217 ZEP 2013 02 07 09 50 00 800-91 P co CCGG 188.260 -999.990 .X. V2 2013 03 05 13 35 00 78.9067 11.8883 479.00 474.00 5.00 348218 ZEP 2013 02 14 08 54 00 737-91 P co CCGG 159.630 -999.990 ... V2 2013 03 19 10 12 00 78.9067 11.8883 479.00 474.00 5.00 348801 ZEP 2013 02 14 08 54 00 738-91 P co CCGG 161.530 -999.990 ... V2 2013 03 19 10 29 00 78.9067 11.8883 479.00 474.00 5.00 348802 ZEP 2013 02 21 08 35 00 795-91 P co CCGG 155.940 -999.990 ... V2 2013 03 19 13 27 00 78.9067 11.8883 479.00 474.00 5.00 348803 ZEP 2013 02 21 08 35 00 796-91 P co CCGG 156.400 -999.990 ... V2 2013 03 19 13 43 00 78.9067 11.8883 479.00 474.00 5.00 348804 ZEP 2013 02 28 09 55 00 1429-99 P co CCGG 150.990 -999.990 ... V4 2013 04 02 12 10 00 78.9067 11.8883 479.00 474.00 5.00 349459 ZEP 2013 02 28 09 55 00 1430-99 P co CCGG 150.290 -999.990 ... V4 2013 04 02 12 26 00 78.9067 11.8883 479.00 474.00 5.00 349460 ZEP 2013 03 07 09 29 00 5051-99 P co CCGG 150.950 -999.990 ... V4 2013 04 02 12 42 00 78.9067 11.8883 479.00 474.00 5.00 349457 ZEP 2013 03 07 09 29 00 5052-99 P co CCGG 151.130 -999.990 ... V4 2013 04 02 12 58 00 78.9067 11.8883 479.00 474.00 5.00 349458 ZEP 2013 03 14 14 10 00 2315-99 P co CCGG 147.610 -999.990 ... V4 2013 04 17 10 25 00 78.9067 11.8883 479.00 474.00 5.00 350213 ZEP 2013 03 14 14 10 00 2316-99 P co CCGG 148.850 -999.990 ... V4 2013 04 17 10 41 00 78.9067 11.8883 479.00 474.00 5.00 350214 ZEP 2013 03 21 10 17 00 2295-99 P co CCGG 154.180 -999.990 ... V4 2013 04 17 09 53 00 78.9067 11.8883 479.00 474.00 5.00 350215 ZEP 2013 03 21 10 17 00 2296-99 P co CCGG 153.100 -999.990 ... V4 2013 04 17 10 09 00 78.9067 11.8883 479.00 474.00 5.00 350216 ZEP 2013 03 28 09 29 00 3555-99 P co CCGG 156.850 -999.990 ... V4 2013 04 25 13 44 00 78.9067 11.8883 479.00 474.00 5.00 350510 ZEP 2013 03 28 09 29 00 3556-99 P co CCGG 155.330 -999.990 ... V4 2013 04 25 14 00 00 78.9067 11.8883 479.00 474.00 5.00 350511 ZEP 2013 04 04 08 30 00 1287-99 P co CCGG 154.200 -999.990 ... V4 2013 04 25 14 16 00 78.9067 11.8883 479.00 474.00 5.00 350508 ZEP 2013 04 04 08 30 00 1288-99 P co CCGG 153.940 -999.990 ... V4 2013 04 25 14 32 00 78.9067 11.8883 479.00 474.00 5.00 350509 ZEP 2013 04 12 06 50 00 3537-99 P co CCGG 155.640 -999.990 ... V4 2013 05 10 14 38 00 78.9067 11.8883 479.00 474.00 5.00 351260 ZEP 2013 04 12 06 50 00 3538-99 P co CCGG 156.020 -999.990 ... V4 2013 05 10 14 54 00 78.9067 11.8883 479.00 474.00 5.00 351261 ZEP 2013 04 18 08 30 00 1549-99 P co CCGG 145.890 -999.990 ... V2 2013 05 10 14 51 00 78.9067 11.8883 479.00 474.00 5.00 351262 ZEP 2013 04 18 08 30 00 1550-99 P co CCGG 145.740 -999.990 ... V2 2013 05 10 15 08 00 78.9067 11.8883 479.00 474.00 5.00 351263 ZEP 2013 04 25 08 45 00 4113-99 P co CCGG 148.450 -999.990 +.. V2 2013 05 28 13 12 00 78.9067 11.8883 479.00 474.00 5.00 351992 ZEP 2013 04 25 08 45 00 4114-99 P co CCGG 145.810 -999.990 -.. V2 2013 05 28 13 28 00 78.9067 11.8883 479.00 474.00 5.00 351993 ZEP 2013 05 02 08 05 00 4651-99 P co CCGG 139.650 -999.990 ... V2 2013 05 28 12 39 00 78.9067 11.8883 479.00 474.00 5.00 351994 ZEP 2013 05 02 08 05 00 4652-99 P co CCGG 141.190 -999.990 ... V2 2013 05 28 12 55 00 78.9067 11.8883 479.00 474.00 5.00 351995 ZEP 2013 05 09 09 16 00 2997-99 P co CCGG 138.080 -999.990 ... V4 2013 06 07 11 01 00 78.9067 11.8883 479.00 474.00 5.00 352601 ZEP 2013 05 09 09 16 00 2998-99 P co CCGG 137.620 -999.990 ... V4 2013 06 07 11 17 00 78.9067 11.8883 479.00 474.00 5.00 352602 ZEP 2013 05 16 08 19 00 4999-99 P co CCGG 130.010 -999.990 ... V4 2013 06 07 11 33 00 78.9067 11.8883 479.00 474.00 5.00 352599 ZEP 2013 05 16 08 19 00 5000-99 P co CCGG 130.260 -999.990 ... V4 2013 06 07 11 49 00 78.9067 11.8883 479.00 474.00 5.00 352600 ZEP 2013 05 23 09 15 00 3417-99 P co CCGG 124.410 -999.990 ... V4 2013 06 20 11 44 00 78.9067 11.8883 479.00 474.00 5.00 353602 ZEP 2013 05 23 09 15 00 3418-99 P co CCGG 124.010 -999.990 ... V4 2013 06 20 12 00 00 78.9067 11.8883 479.00 474.00 5.00 353601 ZEP 2013 05 27 08 02 00 3927-99 P co CCGG 96.970 -999.990 ... V4 2013 07 24 14 32 00 78.9067 11.8883 479.00 474.00 5.00 354600 ZEP 2013 05 27 08 02 00 3928-99 P co CCGG 96.890 -999.990 ... V4 2013 07 24 14 48 00 78.9067 11.8883 479.00 474.00 5.00 354601 ZEP 2013 05 30 08 51 00 5-99 P co CCGG 116.140 -999.990 ... V4 2013 06 20 11 12 00 78.9067 11.8883 479.00 474.00 5.00 353603 ZEP 2013 05 30 08 51 00 6-99 P co CCGG 115.830 -999.990 ... V4 2013 06 20 11 28 00 78.9067 11.8883 479.00 474.00 5.00 353604 ZEP 2013 06 06 09 35 00 3109-99 P co CCGG 102.210 -999.990 ... V2 2013 07 08 14 19 00 78.9067 11.8883 479.00 474.00 5.00 353991 ZEP 2013 06 06 09 35 00 3110-99 P co CCGG 101.700 -999.990 ... V2 2013 07 08 14 35 00 78.9067 11.8883 479.00 474.00 5.00 353992 ZEP 2013 06 13 07 32 00 2597-99 P co CCGG 102.930 -999.990 +.. V2 2013 07 08 13 46 00 78.9067 11.8883 479.00 474.00 5.00 353989 ZEP 2013 06 13 07 32 00 2598-99 P co CCGG 99.400 -999.990 -.. V2 2013 07 08 14 03 00 78.9067 11.8883 479.00 474.00 5.00 353990 ZEP 2013 06 20 08 45 00 3577-99 P co CCGG 96.060 -999.990 ... V4 2013 07 24 14 00 00 78.9067 11.8883 479.00 474.00 5.00 354602 ZEP 2013 06 20 08 45 00 3578-99 P co CCGG 95.690 -999.990 ... V4 2013 07 24 14 16 00 78.9067 11.8883 479.00 474.00 5.00 354603 ZEP 2013 07 04 07 30 00 1617-99 P co CCGG 89.400 -999.990 ... V4 2013 08 06 09 17 00 78.9067 11.8883 479.00 474.00 5.00 355242 ZEP 2013 07 04 07 30 00 1618-99 P co CCGG 87.910 -999.990 ... V4 2013 08 06 09 33 00 78.9067 11.8883 479.00 474.00 5.00 355243 ZEP 2013 07 11 08 12 00 297-99 P co CCGG 90.140 -999.990 ... V4 2013 08 06 09 48 00 78.9067 11.8883 479.00 474.00 5.00 355240 ZEP 2013 07 11 08 12 00 298-99 P co CCGG 91.250 -999.990 ... V4 2013 08 06 10 04 00 78.9067 11.8883 479.00 474.00 5.00 355241 ZEP 2013 07 18 08 29 00 2761-99 P co CCGG 82.870 -999.990 ... V4 2013 08 16 13 32 00 78.9067 11.8883 479.00 474.00 5.00 355971 ZEP 2013 07 18 08 29 00 2762-99 P co CCGG 82.490 -999.990 ... V4 2013 08 16 13 48 00 78.9067 11.8883 479.00 474.00 5.00 355972 ZEP 2013 07 25 08 25 00 1703-99 P co CCGG 87.780 -999.990 ... V4 2013 08 16 14 04 00 78.9067 11.8883 479.00 474.00 5.00 355970 ZEP 2013 07 25 08 25 00 1704-99 P co CCGG 87.180 -999.990 ... V4 2013 08 16 14 20 00 78.9067 11.8883 479.00 474.00 5.00 355969 ZEP 2013 08 01 08 35 00 1383-99 P co CCGG 97.070 -999.990 ... V4 2013 09 04 15 27 00 78.9067 11.8883 479.00 474.00 5.00 356807 ZEP 2013 08 01 08 35 00 1384-99 P co CCGG 96.690 -999.990 ... V4 2013 09 04 15 43 00 78.9067 11.8883 479.00 474.00 5.00 356808 ZEP 2013 08 08 09 10 00 2905-99 P co CCGG 86.470 -999.990 ... V4 2013 09 04 14 55 00 78.9067 11.8883 479.00 474.00 5.00 356809 ZEP 2013 08 08 09 10 00 2906-99 P co CCGG 86.530 -999.990 ... V4 2013 09 04 15 11 00 78.9067 11.8883 479.00 474.00 5.00 356810 ZEP 2013 08 16 08 55 00 3305-99 P co CCGG 96.270 -999.990 ... V3 2013 09 30 13 39 00 78.9067 11.8883 479.00 474.00 5.00 357326 ZEP 2013 08 16 08 55 00 3306-99 P co CCGG 95.980 -999.990 ... V3 2013 09 30 13 55 00 78.9067 11.8883 479.00 474.00 5.00 357327 ZEP 2013 08 22 06 50 00 5218-99 P co CCGG 91.420 -999.990 ... V4 2013 10 28 12 46 00 78.9067 11.8883 479.00 474.00 5.00 357313 ZEP 2013 08 22 07 50 00 1757-99 P co CCGG 90.600 -999.990 ... V3 2013 09 27 16 05 00 78.9067 11.8883 479.00 474.00 5.00 357297 ZEP 2013 08 22 07 50 00 1758-99 P co CCGG 90.240 -999.990 ... V3 2013 09 27 16 21 00 78.9067 11.8883 479.00 474.00 5.00 357298 ZEP 2013 08 29 12 34 56 4941-99 P co CCGG 101.340 -999.990 ... V3 2013 10 24 13 34 00 78.9067 11.8883 479.00 474.00 5.00 358038 ZEP 2013 08 29 12 34 56 4942-99 P co CCGG 101.160 -999.990 ... V3 2013 10 24 13 51 00 78.9067 11.8883 479.00 474.00 5.00 358039 ZEP 2013 09 05 08 10 00 1351-99 P co CCGG 96.600 -999.990 ... V3 2013 10 24 11 24 00 78.9067 11.8883 479.00 474.00 5.00 358036 ZEP 2013 09 05 08 10 00 1352-99 P co CCGG 95.870 -999.990 ... V3 2013 10 24 11 41 00 78.9067 11.8883 479.00 474.00 5.00 358037 ZEP 2013 09 12 07 40 00 5-99 P co CCGG 97.120 -999.990 ... V4 2013 11 04 16 29 00 78.9067 11.8883 479.00 474.00 5.00 358710 ZEP 2013 09 12 07 40 00 6-99 P co CCGG 97.350 -999.990 ... V4 2013 11 04 16 45 00 78.9067 11.8883 479.00 474.00 5.00 358711 ZEP 2013 09 19 08 35 00 39-99 P co CCGG 105.450 -999.990 ... V4 2013 11 04 15 57 00 78.9067 11.8883 479.00 474.00 5.00 358712 ZEP 2013 09 19 08 35 00 40-99 P co CCGG 106.250 -999.990 ... V4 2013 11 04 16 13 00 78.9067 11.8883 479.00 474.00 5.00 358713 ZEP 2013 09 26 07 20 00 3235-99 P co CCGG 102.380 -999.990 ... V4 2013 11 06 12 10 00 78.9067 11.8883 479.00 474.00 5.00 359186 ZEP 2013 09 26 07 20 00 3236-99 P co CCGG 102.230 -999.990 ... V4 2013 11 06 12 26 00 78.9067 11.8883 479.00 474.00 5.00 359187 ZEP 2013 10 03 08 26 00 715-99 P co CCGG 101.880 -999.990 ... V4 2013 11 06 11 38 00 78.9067 11.8883 479.00 474.00 5.00 359184 ZEP 2013 10 03 08 26 00 716-99 P co CCGG 102.070 -999.990 ... V4 2013 11 06 11 54 00 78.9067 11.8883 479.00 474.00 5.00 359185 ZEP 2013 10 10 08 00 00 621-99 P co CCGG 102.660 -999.990 ... V4 2013 11 26 11 19 00 78.9067 11.8883 479.00 474.00 5.00 360523 ZEP 2013 10 17 07 19 00 216-99 P co CCGG 104.370 -999.990 ... V4 2013 11 26 11 35 00 78.9067 11.8883 479.00 474.00 5.00 360524 ZEP 2013 10 25 09 05 00 935-99 P co CCGG 106.490 -999.990 ... V4 2013 11 26 15 03 00 78.9067 11.8883 479.00 474.00 5.00 360513 ZEP 2013 10 25 09 05 00 936-99 P co CCGG 106.410 -999.990 ... V4 2013 11 26 15 19 00 78.9067 11.8883 479.00 474.00 5.00 360514 ZEP 2013 10 31 08 40 00 3711-99 P co CCGG 106.810 -999.990 ... V4 2013 11 26 15 35 00 78.9067 11.8883 479.00 474.00 5.00 360511 ZEP 2013 10 31 08 40 00 3712-99 P co CCGG 106.990 -999.990 ... V4 2013 11 26 15 51 00 78.9067 11.8883 479.00 474.00 5.00 360512 ZEP 2013 11 07 08 30 00 1691-99 P co CCGG 107.990 -999.990 ... V4 2013 12 02 14 03 00 78.9067 11.8883 479.00 474.00 5.00 360663 ZEP 2013 11 07 08 30 00 1692-99 P co CCGG 108.100 -999.990 ... V4 2013 12 02 14 19 00 78.9067 11.8883 479.00 474.00 5.00 360664 ZEP 2013 11 14 09 15 00 2501-99 P co CCGG 110.940 -999.990 ... V4 2013 12 02 11 23 00 78.9067 11.8883 479.00 474.00 5.00 360665 ZEP 2013 11 14 09 15 00 2502-99 P co CCGG 110.950 -999.990 ... V4 2013 12 02 11 39 00 78.9067 11.8883 479.00 474.00 5.00 360666 ZEP 2013 11 21 09 50 00 4109-99 P co CCGG 111.760 -999.990 ... V4 2013 12 30 12 08 00 78.9067 11.8883 479.00 474.00 5.00 361919 ZEP 2013 11 21 09 50 00 4110-99 P co CCGG 111.830 -999.990 ... V4 2013 12 30 12 24 00 78.9067 11.8883 479.00 474.00 5.00 361920 ZEP 2013 11 28 09 05 00 5413-99 P co CCGG 116.230 -999.990 ... V4 2013 12 30 12 40 00 78.9067 11.8883 479.00 474.00 5.00 361917 ZEP 2013 11 28 09 05 00 5414-99 P co CCGG 115.540 -999.990 ... V4 2013 12 30 12 56 00 78.9067 11.8883 479.00 474.00 5.00 361918 ZEP 2013 12 06 09 55 00 1703-99 P co CCGG 123.860 -999.990 ... V4 2014 01 03 11 51 00 78.9067 11.8883 479.00 474.00 5.00 362270 ZEP 2013 12 06 09 55 00 1704-99 P co CCGG 122.710 -999.990 ... V4 2014 01 03 12 07 00 78.9067 11.8883 479.00 474.00 5.00 362271 ZEP 2013 12 12 09 07 00 1851-99 P co CCGG 126.860 -999.990 ... V4 2014 01 03 11 19 00 78.9067 11.8883 479.00 474.00 5.00 362268 ZEP 2013 12 12 09 07 00 1852-99 P co CCGG 127.470 -999.990 ... V4 2014 01 03 11 35 00 78.9067 11.8883 479.00 474.00 5.00 362269 ZEP 2013 12 19 09 00 00 3331-99 P co CCGG 117.030 -999.990 ... V3 2014 02 03 12 36 00 78.9067 11.8883 479.00 474.00 5.00 362956 ZEP 2013 12 19 09 00 00 3332-99 P co CCGG 116.170 -999.990 ... V3 2014 02 03 12 52 00 78.9067 11.8883 479.00 474.00 5.00 362957 ZEP 2013 12 26 12 10 00 2631-99 P co CCGG 147.420 -999.990 .X. V4 2014 02 03 13 00 00 78.9067 11.8883 479.00 474.00 5.00 362954 ZEP 2013 12 26 12 10 00 2632-99 P co CCGG 147.100 -999.990 .X. V4 2014 02 03 13 16 00 78.9067 11.8883 479.00 474.00 5.00 362955 ZEP 2014 01 02 11 33 00 5207-99 P co CCGG 125.510 -999.990 ... V3 2014 02 14 12 12 00 78.9067 11.8883 479.00 474.00 5.00 363931 ZEP 2014 01 02 11 33 00 5208-99 P co CCGG 125.630 -999.990 ... V3 2014 02 14 12 28 00 78.9067 11.8883 479.00 474.00 5.00 363932 ZEP 2014 01 09 08 29 00 4505-99 P co CCGG 121.620 -999.990 ... V4 2014 02 18 13 55 00 78.9067 11.8883 479.00 474.00 5.00 363855 ZEP 2014 01 09 08 29 00 4506-99 P co CCGG 121.710 -999.990 ... V4 2014 02 18 14 11 00 78.9067 11.8883 479.00 474.00 5.00 363856 ZEP 2014 01 16 09 15 00 2047-99 P co CCGG 134.980 -999.990 ... V4 2014 02 18 14 27 00 78.9067 11.8883 479.00 474.00 5.00 363857 ZEP 2014 01 16 09 15 00 2048-99 P co CCGG 134.460 -999.990 ... V4 2014 02 18 14 43 00 78.9067 11.8883 479.00 474.00 5.00 363858 ZEP 2014 01 23 10 00 00 4035-99 P co CCGG 141.910 -999.990 ... V3 2014 02 18 14 10 00 78.9067 11.8883 479.00 474.00 5.00 363859 ZEP 2014 01 23 10 00 00 4036-99 P co CCGG 141.660 -999.990 ... V3 2014 02 18 14 26 00 78.9067 11.8883 479.00 474.00 5.00 363860 ZEP 2014 01 30 08 49 00 2705-99 P co CCGG 132.440 -999.990 ... V4 2014 02 25 16 24 00 78.9067 11.8883 479.00 474.00 5.00 364517 ZEP 2014 01 30 08 49 00 2706-99 P co CCGG 132.770 -999.990 ... V4 2014 02 25 16 40 00 78.9067 11.8883 479.00 474.00 5.00 364518 ZEP 2014 02 06 10 08 00 6717-66 P co CCGG 171.290 -999.990 .X. V4 2014 02 25 15 52 00 78.9067 11.8883 479.00 474.00 5.00 364519 ZEP 2014 02 06 10 08 00 6718-66 P co CCGG 171.720 -999.990 .X. V4 2014 02 25 16 08 00 78.9067 11.8883 479.00 474.00 5.00 364520 ZEP 2014 02 13 10 20 00 1287-99 P co CCGG 180.080 -999.990 .X. V4 2014 03 10 12 42 00 78.9067 11.8883 479.00 474.00 5.00 365087 ZEP 2014 02 13 10 20 00 1288-99 P co CCGG 181.310 -999.990 .X. V4 2014 03 10 12 58 00 78.9067 11.8883 479.00 474.00 5.00 365088 ZEP 2014 02 20 10 08 00 2453-99 P co CCGG 141.050 -999.990 ... V4 2014 03 10 13 14 00 78.9067 11.8883 479.00 474.00 5.00 365089 ZEP 2014 02 20 10 08 00 2454-99 P co CCGG 140.890 -999.990 ... V4 2014 03 10 13 30 00 78.9067 11.8883 479.00 474.00 5.00 365090 ZEP 2014 02 27 09 39 00 1333-99 P co CCGG 151.900 -999.990 ... V4 2014 04 04 13 34 00 78.9067 11.8883 479.00 474.00 5.00 366092 ZEP 2014 02 27 09 39 00 1334-99 P co CCGG 151.860 -999.990 ... V4 2014 04 04 13 50 00 78.9067 11.8883 479.00 474.00 5.00 366093 ZEP 2014 03 06 10 10 00 5075-99 P co CCGG 158.310 -999.990 ... V4 2014 04 04 13 02 00 78.9067 11.8883 479.00 474.00 5.00 366090 ZEP 2014 03 06 10 10 00 5076-99 P co CCGG 157.710 -999.990 ... V4 2014 04 04 13 18 00 78.9067 11.8883 479.00 474.00 5.00 366091 ZEP 2014 03 13 09 00 00 2013-99 P co CCGG 150.860 -999.990 ... V4 2014 04 24 14 22 00 78.9067 11.8883 479.00 474.00 5.00 366486 ZEP 2014 03 28 09 05 00 355-99 P co CCGG 150.160 -999.990 ... V4 2014 04 21 16 07 00 78.9067 11.8883 479.00 474.00 5.00 366816 ZEP 2014 03 28 09 05 00 356-99 P co CCGG 150.490 -999.990 ... V4 2014 04 21 16 23 00 78.9067 11.8883 479.00 474.00 5.00 366817 ZEP 2014 04 03 07 53 00 1379-99 P co CCGG 144.540 -999.990 ... V4 2014 04 21 15 03 00 78.9067 11.8883 479.00 474.00 5.00 366818 ZEP 2014 04 03 07 53 00 1380-99 P co CCGG 143.370 -999.990 ... V4 2014 04 21 15 19 00 78.9067 11.8883 479.00 474.00 5.00 366819 ZEP 2014 04 10 08 00 00 1455-99 P co CCGG 145.320 -999.990 ... V4 2014 05 14 12 25 00 78.9067 11.8883 479.00 474.00 5.00 367446 ZEP 2014 04 10 08 00 00 1456-99 P co CCGG 145.120 -999.990 ... V4 2014 05 14 12 41 00 78.9067 11.8883 479.00 474.00 5.00 367447 ZEP 2014 04 18 09 03 00 2639-99 P co CCGG 141.830 -999.990 ... V4 2014 05 14 11 53 00 78.9067 11.8883 479.00 474.00 5.00 367448 ZEP 2014 04 18 09 03 00 2640-99 P co CCGG 142.480 -999.990 ... V4 2014 05 14 12 09 00 78.9067 11.8883 479.00 474.00 5.00 367449 ZEP 2014 04 24 09 11 00 5196-99 P co CCGG 140.110 -999.990 ... V4 2014 05 30 14 48 00 78.9067 11.8883 479.00 474.00 5.00 368218 ZEP 2014 05 01 10 08 00 1261-99 P co CCGG 133.040 -999.990 ... V4 2014 05 30 15 20 00 78.9067 11.8883 479.00 474.00 5.00 368219 ZEP 2014 05 01 10 08 00 1262-99 P co CCGG 133.360 -999.990 ... V4 2014 05 30 15 36 00 78.9067 11.8883 479.00 474.00 5.00 368220 ZEP 2014 05 08 08 47 00 1927-99 P co CCGG 132.270 -999.990 ... V4 2014 06 20 12 52 00 78.9067 11.8883 479.00 474.00 5.00 369007 ZEP 2014 05 08 08 47 00 1928-99 P co CCGG 131.690 -999.990 ... V4 2014 06 20 13 08 00 78.9067 11.8883 479.00 474.00 5.00 369008 ZEP 2014 05 15 09 00 00 851-99 P co CCGG 130.000 -999.990 ... V4 2014 06 20 12 20 00 78.9067 11.8883 479.00 474.00 5.00 369005 ZEP 2014 05 15 09 00 00 852-99 P co CCGG 129.630 -999.990 ... V4 2014 06 20 12 36 00 78.9067 11.8883 479.00 474.00 5.00 369006 ZEP 2014 05 22 07 55 00 2065-99 P co CCGG 124.200 -999.990 ... V4 2014 06 26 14 34 00 78.9067 11.8883 479.00 474.00 5.00 369481 ZEP 2014 05 22 07 55 00 2066-99 P co CCGG 124.330 -999.990 ... V4 2014 06 26 14 50 00 78.9067 11.8883 479.00 474.00 5.00 369482 ZEP 2014 05 29 10 27 00 4675-99 P co CCGG 117.720 -999.990 ... V4 2014 06 26 15 22 00 78.9067 11.8883 479.00 474.00 5.00 369483 ZEP 2014 05 29 10 27 00 4676-99 P co CCGG 117.060 -999.990 ... V4 2014 06 26 15 06 00 78.9067 11.8883 479.00 474.00 5.00 369484 ZEP 2014 06 05 08 00 00 2923-99 P co CCGG 107.860 -999.990 ... V4 2014 07 09 15 37 00 78.9067 11.8883 479.00 474.00 5.00 370129 ZEP 2014 06 05 08 00 00 2924-99 P co CCGG 107.200 -999.990 ... V4 2014 07 09 15 53 00 78.9067 11.8883 479.00 474.00 5.00 370130 ZEP 2014 06 12 07 50 00 989-99 P co CCGG 104.080 -999.990 ... V4 2014 07 09 15 05 00 78.9067 11.8883 479.00 474.00 5.00 370127 ZEP 2014 06 12 07 50 00 990-99 P co CCGG 104.240 -999.990 ... V4 2014 07 09 15 21 00 78.9067 11.8883 479.00 474.00 5.00 370128 ZEP 2014 06 19 09 15 00 1235-99 P co CCGG 94.590 -999.990 ... V4 2014 07 23 12 54 00 78.9067 11.8883 479.00 474.00 5.00 370752 ZEP 2014 06 19 09 15 00 1236-99 P co CCGG 95.430 -999.990 ... V4 2014 07 23 13 10 00 78.9067 11.8883 479.00 474.00 5.00 370753 ZEP 2014 06 26 08 55 00 4567-99 P co CCGG 89.710 -999.990 ... V4 2014 07 23 13 26 00 78.9067 11.8883 479.00 474.00 5.00 370750 ZEP 2014 06 26 08 55 00 4568-99 P co CCGG 89.670 -999.990 ... V4 2014 07 23 13 42 00 78.9067 11.8883 479.00 474.00 5.00 370751 ZEP 2014 07 03 07 45 00 2591-99 P co CCGG 87.800 -999.990 ... V4 2014 08 01 10 28 00 78.9067 11.8883 479.00 474.00 5.00 371327 ZEP 2014 07 03 07 45 00 2592-99 P co CCGG 88.850 -999.990 ... V4 2014 08 01 10 44 00 78.9067 11.8883 479.00 474.00 5.00 371328 ZEP 2014 07 10 07 41 00 6537-66 P co CCGG 85.360 -999.990 ... V4 2014 08 01 09 56 00 78.9067 11.8883 479.00 474.00 5.00 371329 ZEP 2014 07 10 07 41 00 6538-66 P co CCGG 85.050 -999.990 ... V4 2014 08 01 10 12 00 78.9067 11.8883 479.00 474.00 5.00 371330 ZEP 2014 07 17 08 45 00 3251-99 P co CCGG 80.140 -999.990 ... V4 2014 08 15 12 23 00 78.9067 11.8883 479.00 474.00 5.00 372097 ZEP 2014 07 17 08 45 00 3252-99 P co CCGG 80.840 -999.990 ... V4 2014 08 15 12 39 00 78.9067 11.8883 479.00 474.00 5.00 372098 ZEP 2014 07 24 07 59 00 1306-99 P co CCGG 87.840 -999.990 ... V4 2014 08 15 12 55 00 78.9067 11.8883 479.00 474.00 5.00 372095 ZEP 2014 07 24 07 59 00 1307-99 P co CCGG 87.520 -999.990 ... V4 2014 08 15 13 11 00 78.9067 11.8883 479.00 474.00 5.00 372096 ZEP 2014 07 31 08 05 00 2753-99 P co CCGG 77.950 -999.990 ... V4 2014 08 26 16 28 00 78.9067 11.8883 479.00 474.00 5.00 372889 ZEP 2014 07 31 08 05 00 2754-99 P co CCGG 77.630 -999.990 ... V4 2014 08 26 16 44 00 78.9067 11.8883 479.00 474.00 5.00 372890 ZEP 2014 08 07 09 01 00 129-99 P co CCGG 79.200 -999.990 ... V4 2014 08 26 15 56 00 78.9067 11.8883 479.00 474.00 5.00 372887 ZEP 2014 08 07 09 01 00 130-99 P co CCGG 79.690 -999.990 ... V4 2014 08 26 16 12 00 78.9067 11.8883 479.00 474.00 5.00 372888 ZEP 2014 08 14 09 10 00 1559-99 P co CCGG 106.040 -999.990 ... V4 2014 09 09 11 01 00 78.9067 11.8883 479.00 474.00 5.00 373637 ZEP 2014 08 21 08 08 00 2049-99 P co CCGG 108.510 -999.990 ... V4 2014 09 09 11 33 00 78.9067 11.8883 479.00 474.00 5.00 373638 ZEP 2014 08 21 08 08 00 2050-99 P co CCGG 109.020 -999.990 ... V4 2014 09 09 11 49 00 78.9067 11.8883 479.00 474.00 5.00 373639 ZEP 2014 08 28 08 15 00 4310-99 P co CCGG 112.850 -999.990 ... V4 2014 09 26 12 32 00 78.9067 11.8883 479.00 474.00 5.00 374376 ZEP 2014 09 04 08 05 00 4787-99 P co CCGG 114.630 -999.990 ... V4 2014 09 24 09 58 00 78.9067 11.8883 479.00 474.00 5.00 374377 ZEP 2014 09 04 08 05 00 4788-99 P co CCGG 114.170 -999.990 ... V4 2014 09 24 10 14 00 78.9067 11.8883 479.00 474.00 5.00 374378 ZEP 2014 09 11 08 01 00 3963-99 P co CCGG 117.630 -999.990 ... V4 2014 10 03 09 40 00 78.9067 11.8883 479.00 474.00 5.00 374866 ZEP 2014 09 11 08 01 00 3964-99 P co CCGG 118.340 -999.990 ... V4 2014 10 03 09 56 00 78.9067 11.8883 479.00 474.00 5.00 374867 ZEP 2014 09 19 07 40 00 2853-99 P co CCGG 117.280 -999.990 ... V4 2014 10 06 12 46 00 78.9067 11.8883 479.00 474.00 5.00 374984 ZEP 2014 09 19 07 40 00 2854-99 P co CCGG 117.120 -999.990 ... V4 2014 10 06 13 02 00 78.9067 11.8883 479.00 474.00 5.00 374985 ZEP 2014 09 26 09 45 00 133-99 P co CCGG 117.830 -999.990 ... V4 2014 10 20 11 10 00 78.9067 11.8883 479.00 474.00 5.00 375781 ZEP 2014 09 26 09 45 00 134-99 P co CCGG 118.090 -999.990 ... V4 2014 10 20 11 26 00 78.9067 11.8883 479.00 474.00 5.00 375782 ZEP 2014 10 02 07 43 00 935-99 P co CCGG 116.030 -999.990 ... V4 2014 10 20 10 38 00 78.9067 11.8883 479.00 474.00 5.00 375783 ZEP 2014 10 02 07 43 00 936-99 P co CCGG 115.140 -999.990 ... V4 2014 10 20 10 54 00 78.9067 11.8883 479.00 474.00 5.00 375784 ZEP 2014 10 09 08 00 00 1261-99 P co CCGG 113.410 -999.990 ... V4 2014 11 11 15 09 00 78.9067 11.8883 479.00 474.00 5.00 376696 ZEP 2014 10 09 08 00 00 1262-99 P co CCGG 112.770 -999.990 ... V4 2014 11 11 15 25 00 78.9067 11.8883 479.00 474.00 5.00 376697 ZEP 2014 10 16 08 05 00 3251-99 P co CCGG 114.600 -999.990 ... V4 2014 11 11 15 41 00 78.9067 11.8883 479.00 474.00 5.00 376694 ZEP 2014 10 16 08 05 00 3252-99 P co CCGG 113.670 -999.990 ... V4 2014 11 11 15 57 00 78.9067 11.8883 479.00 474.00 5.00 376695 ZEP 2014 10 23 09 10 00 3303-99 P co CCGG 113.280 -999.990 ... V4 2014 11 26 09 40 00 78.9067 11.8883 479.00 474.00 5.00 377492 ZEP 2014 10 23 09 10 00 3304-99 P co CCGG 114.300 -999.990 ... V4 2014 11 26 09 56 00 78.9067 11.8883 479.00 474.00 5.00 377493 ZEP 2014 10 30 08 41 00 5079-99 P co CCGG 112.870 -999.990 ... V4 2014 11 25 15 45 00 78.9067 11.8883 479.00 474.00 5.00 377490 ZEP 2014 10 30 08 41 00 5080-99 P co CCGG 113.860 -999.990 ... V4 2014 11 25 16 01 00 78.9067 11.8883 479.00 474.00 5.00 377491 ZEP 2014 11 06 10 25 00 307-99 P co CCGG 115.460 -999.990 ... V4 2014 12 10 13 14 00 78.9067 11.8883 479.00 474.00 5.00 378350 ZEP 2014 11 06 10 25 00 308-99 P co CCGG 115.630 -999.990 ... V4 2014 12 10 13 31 00 78.9067 11.8883 479.00 474.00 5.00 378351 ZEP 2014 11 13 10 24 00 3217-99 P co CCGG 121.320 -999.990 ... V4 2014 12 10 13 47 00 78.9067 11.8883 479.00 474.00 5.00 378348 ZEP 2014 11 13 10 24 00 3218-99 P co CCGG 120.380 -999.990 ... V4 2014 12 10 14 03 00 78.9067 11.8883 479.00 474.00 5.00 378349 ZEP 2014 11 20 08 45 00 399-99 P co CCGG 123.910 -999.990 ... V4 2014 12 24 09 39 00 78.9067 11.8883 479.00 474.00 5.00 379176 ZEP 2014 11 20 08 45 00 400-99 P co CCGG 124.410 -999.990 ... V4 2014 12 24 09 55 00 78.9067 11.8883 479.00 474.00 5.00 379177 ZEP 2014 11 27 09 47 00 4945-99 P co CCGG 124.510 -999.990 ... V4 2014 12 24 09 07 00 78.9067 11.8883 479.00 474.00 5.00 379174 ZEP 2014 11 27 09 47 00 4946-99 P co CCGG 124.200 -999.990 ... V4 2014 12 24 09 23 00 78.9067 11.8883 479.00 474.00 5.00 379175 ZEP 2014 12 04 09 20 00 559-99 P co CCGG 144.970 -999.990 ... V4 2015 01 12 14 37 00 78.9067 11.8883 479.00 474.00 5.00 379731 ZEP 2014 12 04 09 20 00 560-99 P co CCGG 144.840 -999.990 ... V4 2015 01 12 14 53 00 78.9067 11.8883 479.00 474.00 5.00 379732 ZEP 2014 12 11 09 31 00 3001-99 P co CCGG 136.890 -999.990 ... V4 2015 01 12 14 04 00 78.9067 11.8883 479.00 474.00 5.00 379729 ZEP 2014 12 11 09 31 00 3002-99 P co CCGG 137.000 -999.990 ... V4 2015 01 12 14 20 00 78.9067 11.8883 479.00 474.00 5.00 379730 ZEP 2014 12 18 10 10 00 1134-99 P co CCGG 159.740 -999.990 .X. V4 2015 02 02 10 57 00 78.9067 11.8883 479.00 474.00 5.00 380410 ZEP 2014 12 18 10 10 00 2203-99 P co CCGG 160.350 -999.990 .X. V4 2015 02 02 10 41 00 78.9067 11.8883 479.00 474.00 5.00 380409 ZEP 2014 12 25 13 04 00 1133-99 P co CCGG 128.260 -999.990 ... V4 2015 01 30 17 06 00 78.9067 11.8883 479.00 474.00 5.00 380407 ZEP 2014 12 25 13 04 00 2204-99 P co CCGG 127.980 -999.990 ... V4 2015 01 30 17 22 00 78.9067 11.8883 479.00 474.00 5.00 380408 ZEP 2015 01 01 12 55 00 5121-99 P co CCGG 133.680 -999.990 ... V4 2015 02 10 13 06 00 78.9067 11.8883 479.00 474.00 5.00 380800 ZEP 2015 01 01 12 55 00 5122-99 P co CCGG 134.860 -999.990 ... V4 2015 02 10 13 22 00 78.9067 11.8883 479.00 474.00 5.00 380801 ZEP 2015 01 08 09 27 00 709-99 P co CCGG 130.270 -999.990 ... V4 2015 02 10 12 34 00 78.9067 11.8883 479.00 474.00 5.00 380803 ZEP 2015 01 08 09 27 00 710-99 P co CCGG 130.110 -999.990 ... V4 2015 02 10 12 50 00 78.9067 11.8883 479.00 474.00 5.00 380802 ZEP 2015 01 15 09 15 00 4665-99 P co CCGG 136.790 -999.990 ... V4 2015 03 10 14 22 00 78.9067 11.8883 479.00 474.00 5.00 382015 ZEP 2015 01 15 09 15 00 4666-99 P co CCGG 136.120 -999.990 ... V4 2015 03 10 14 38 00 78.9067 11.8883 479.00 474.00 5.00 382016 ZEP 2015 01 22 08 20 00 2863-99 P co CCGG 138.780 -999.990 ... V4 2015 03 10 14 53 00 78.9067 11.8883 479.00 474.00 5.00 382017 ZEP 2015 01 22 08 20 00 2864-99 P co CCGG 137.600 -999.990 ... V4 2015 03 10 15 09 00 78.9067 11.8883 479.00 474.00 5.00 382018 ZEP 2015 01 29 09 32 00 3485-99 P co CCGG 143.060 -999.990 ... V4 2015 03 18 11 26 00 78.9067 11.8883 479.00 474.00 5.00 382410 ZEP 2015 01 29 09 32 00 3486-99 P co CCGG 143.610 -999.990 ... V4 2015 03 18 11 42 00 78.9067 11.8883 479.00 474.00 5.00 382411 ZEP 2015 02 06 10 05 00 5169-99 P co CCGG 142.310 -999.990 ... V4 2015 03 18 10 06 00 78.9067 11.8883 479.00 474.00 5.00 382412 ZEP 2015 02 06 10 05 00 5170-99 P co CCGG 142.860 -999.990 ... V4 2015 03 18 10 22 00 78.9067 11.8883 479.00 474.00 5.00 382413 ZEP 2015 02 12 08 20 00 721-99 P co CCGG 157.130 -999.990 ... V4 2015 03 24 16 08 00 78.9067 11.8883 479.00 474.00 5.00 383025 ZEP 2015 02 12 08 20 00 722-99 P co CCGG 155.830 -999.990 ... V4 2015 03 24 16 23 00 78.9067 11.8883 479.00 474.00 5.00 383026 ZEP 2015 02 19 08 26 00 3111-99 P co CCGG 155.900 -999.990 ... V4 2015 03 24 15 36 00 78.9067 11.8883 479.00 474.00 5.00 383027 ZEP 2015 02 19 08 26 00 3112-99 P co CCGG 157.300 -999.990 ... V4 2015 03 24 15 52 00 78.9067 11.8883 479.00 474.00 5.00 383028 ZEP 2015 02 27 09 45 00 1387-99 P co CCGG 139.450 -999.990 ... V4 2015 04 14 09 05 00 78.9067 11.8883 479.00 474.00 5.00 384300 ZEP 2015 02 27 09 45 00 1388-99 P co CCGG 138.520 -999.990 ... V4 2015 04 14 09 21 00 78.9067 11.8883 479.00 474.00 5.00 384301 ZEP 2015 03 05 08 35 00 629-99 P co CCGG 152.430 -999.990 ... V4 2015 04 14 09 36 00 78.9067 11.8883 479.00 474.00 5.00 384302 ZEP 2015 03 05 08 35 00 630-99 P co CCGG 152.980 -999.990 ... V4 2015 04 14 09 52 00 78.9067 11.8883 479.00 474.00 5.00 384303 ZEP 2015 03 12 08 45 00 5057-99 P co CCGG 149.430 -999.990 ... V4 2015 04 27 15 28 00 78.9067 11.8883 479.00 474.00 5.00 385300 ZEP 2015 03 12 08 45 00 5058-99 P co CCGG 148.450 -999.990 ... V4 2015 04 27 15 44 00 78.9067 11.8883 479.00 474.00 5.00 385301 ZEP 2015 03 19 08 33 00 5027-99 P co CCGG 147.330 -999.990 ... V4 2015 04 29 11 43 00 78.9067 11.8883 479.00 474.00 5.00 385299 ZEP 2015 03 26 08 52 00 2443-99 P co CCGG 142.040 -999.990 ... V4 2015 05 07 10 02 00 78.9067 11.8883 479.00 474.00 5.00 385861 ZEP 2015 03 26 08 52 00 2444-99 P co CCGG 141.560 -999.990 ... V4 2015 05 07 10 18 00 78.9067 11.8883 479.00 474.00 5.00 385862 ZEP 2015 04 02 10 17 00 4945-99 P co CCGG 146.740 -999.990 ... V4 2015 05 07 09 30 00 78.9067 11.8883 479.00 474.00 5.00 385863 ZEP 2015 04 02 10 17 00 4946-99 P co CCGG 146.660 -999.990 ... V4 2015 05 07 09 46 00 78.9067 11.8883 479.00 474.00 5.00 385864 ZEP 2015 04 09 07 54 00 3619-99 P co CCGG 156.150 -999.990 ... V4 2015 05 21 09 29 00 78.9067 11.8883 479.00 474.00 5.00 386547 ZEP 2015 04 09 07 54 00 3620-99 P co CCGG 155.790 -999.990 ... V4 2015 05 21 09 45 00 78.9067 11.8883 479.00 474.00 5.00 386548 ZEP 2015 04 16 07 55 00 5363-99 P co CCGG 142.580 -999.990 ... V4 2015 05 20 14 38 00 78.9067 11.8883 479.00 474.00 5.00 386545 ZEP 2015 04 16 07 55 00 5364-99 P co CCGG 143.740 -999.990 ... V4 2015 05 20 14 54 00 78.9067 11.8883 479.00 474.00 5.00 386546 ZEP 2015 04 23 07 46 00 2133-99 P co CCGG 149.510 -999.990 ... V4 2015 06 08 12 43 00 78.9067 11.8883 479.00 474.00 5.00 387126 ZEP 2015 04 23 07 46 00 2134-99 P co CCGG 149.680 -999.990 ... V4 2015 06 08 12 59 00 78.9067 11.8883 479.00 474.00 5.00 387127 ZEP 2015 04 30 08 03 00 3723-99 P co CCGG 136.360 -999.990 ... V4 2015 06 08 12 12 00 78.9067 11.8883 479.00 474.00 5.00 387128 ZEP 2015 04 30 08 03 00 3724-99 P co CCGG 137.130 -999.990 ... V4 2015 06 08 12 28 00 78.9067 11.8883 479.00 474.00 5.00 387129 ZEP 2015 05 08 08 00 00 2219-99 P co CCGG 132.780 -999.990 ... V4 2015 06 18 15 52 00 78.9067 11.8883 479.00 474.00 5.00 388017 ZEP 2015 05 08 08 00 00 2220-99 P co CCGG 133.260 -999.990 ... V4 2015 06 18 16 08 00 78.9067 11.8883 479.00 474.00 5.00 388018 ZEP 2015 05 14 08 30 00 5327-99 P co CCGG 129.640 -999.990 ... V4 2015 06 18 16 24 00 78.9067 11.8883 479.00 474.00 5.00 388015 ZEP 2015 05 14 08 30 00 5328-99 P co CCGG 129.940 -999.990 ... V4 2015 06 18 16 40 00 78.9067 11.8883 479.00 474.00 5.00 388016 ZEP 2015 05 21 09 14 00 531-99 P co CCGG 123.220 -999.990 ... V4 2015 07 10 14 16 00 78.9067 11.8883 479.00 474.00 5.00 388848 ZEP 2015 05 21 09 14 00 532-99 P co CCGG 121.860 -999.990 ... V4 2015 07 10 14 32 00 78.9067 11.8883 479.00 474.00 5.00 388849 ZEP 2015 05 28 08 20 00 3849-99 P co CCGG 116.410 -999.990 ... V4 2015 07 10 14 48 00 78.9067 11.8883 479.00 474.00 5.00 388850 ZEP 2015 05 28 08 20 00 3850-99 P co CCGG 117.530 -999.990 ... V4 2015 07 10 15 03 00 78.9067 11.8883 479.00 474.00 5.00 388851 ZEP 2015 06 04 08 37 00 1159-99 P co CCGG 112.150 -999.990 ... V4 2015 07 23 13 36 00 78.9067 11.8883 479.00 474.00 5.00 389874 ZEP 2015 06 04 08 37 00 1160-99 P co CCGG 112.730 -999.990 ... V4 2015 07 23 13 52 00 78.9067 11.8883 479.00 474.00 5.00 389875 ZEP 2015 06 11 07 30 00 4811-99 P co CCGG 106.410 -999.990 ... V4 2015 07 23 13 04 00 78.9067 11.8883 479.00 474.00 5.00 389877 ZEP 2015 06 11 07 30 00 4812-99 P co CCGG 105.560 -999.990 ... V4 2015 07 23 13 20 00 78.9067 11.8883 479.00 474.00 5.00 389876 ZEP 2015 06 18 10 05 00 1987-99 P co CCGG 98.200 -999.990 ... V4 2015 08 12 09 37 00 78.9067 11.8883 479.00 474.00 5.00 391085 ZEP 2015 06 18 10 05 00 1988-99 P co CCGG 96.830 -999.990 ... V4 2015 08 12 09 53 00 78.9067 11.8883 479.00 474.00 5.00 391086 ZEP 2015 06 25 08 45 00 3157-99 P co CCGG 91.650 -999.990 ... V4 2015 08 12 10 57 00 78.9067 11.8883 479.00 474.00 5.00 391087 ZEP 2015 06 25 08 45 00 3158-99 P co CCGG 91.810 -999.990 ... V4 2015 08 12 11 13 00 78.9067 11.8883 479.00 474.00 5.00 391088 ZEP 2015 07 02 07 48 00 3927-99 P co CCGG 87.830 -999.990 ... V4 2015 08 17 11 57 00 78.9067 11.8883 479.00 474.00 5.00 391341 ZEP 2015 07 02 07 48 00 3928-99 P co CCGG 86.970 -999.990 ... V4 2015 08 17 12 13 00 78.9067 11.8883 479.00 474.00 5.00 391342 ZEP 2015 07 09 08 21 00 5031-99 P co CCGG 84.370 -999.990 ... V4 2015 08 17 11 25 00 78.9067 11.8883 479.00 474.00 5.00 391343 ZEP 2015 07 09 08 21 00 5032-99 P co CCGG 84.300 -999.990 ... V4 2015 08 17 11 41 00 78.9067 11.8883 479.00 474.00 5.00 391344 ZEP 2015 07 16 12 34 56 3299-99 P co CCGG 85.500 -999.990 ... V4 2015 08 28 15 04 00 78.9067 11.8883 479.00 474.00 5.00 392069 ZEP 2015 07 16 12 34 56 3300-99 P co CCGG 84.400 -999.990 ... V4 2015 08 28 15 19 00 78.9067 11.8883 479.00 474.00 5.00 392070 ZEP 2015 07 23 08 48 00 851-99 P co CCGG 101.310 -999.990 ... V4 2015 08 28 14 31 00 78.9067 11.8883 479.00 474.00 5.00 392067 ZEP 2015 07 23 08 48 00 852-99 P co CCGG 100.000 -999.990 ... V4 2015 08 28 14 46 00 78.9067 11.8883 479.00 474.00 5.00 392068 ZEP 2015 07 30 08 01 00 4659-99 P co CCGG 106.460 -999.990 ... V4 2015 09 10 15 30 00 78.9067 11.8883 479.00 474.00 5.00 393298 ZEP 2015 07 30 08 01 00 4660-99 P co CCGG 106.080 -999.990 ... V4 2015 09 10 15 46 00 78.9067 11.8883 479.00 474.00 5.00 393299 ZEP 2015 08 06 09 15 00 983-99 P co CCGG 103.370 -999.990 ... V4 2015 09 11 09 27 00 78.9067 11.8883 479.00 474.00 5.00 393300 ZEP 2015 08 06 09 15 00 984-99 P co CCGG 102.860 -999.990 ... V4 2015 09 11 09 43 00 78.9067 11.8883 479.00 474.00 5.00 393301 ZEP 2015 08 13 07 43 00 2233-99 P co CCGG 94.330 -999.990 ... V4 2015 09 17 10 57 00 78.9067 11.8883 479.00 474.00 5.00 393742 ZEP 2015 08 13 07 43 00 2234-99 P co CCGG 95.460 -999.990 ... V4 2015 09 17 11 13 00 78.9067 11.8883 479.00 474.00 5.00 393743 ZEP 2015 08 20 07 50 00 4771-99 P co CCGG 98.380 -999.990 ... V4 2015 09 17 11 29 00 78.9067 11.8883 479.00 474.00 5.00 393744 ZEP 2015 08 20 07 50 00 4772-99 P co CCGG 97.910 -999.990 ... V4 2015 09 17 11 44 00 78.9067 11.8883 479.00 474.00 5.00 393745 ZEP 2015 08 27 09 06 00 119-99 P co CCGG 95.500 -999.990 ... V4 2015 09 30 12 23 00 78.9067 11.8883 479.00 474.00 5.00 394670 ZEP 2015 08 27 09 06 00 120-99 P co CCGG 94.390 -999.990 ... V4 2015 09 30 12 39 00 78.9067 11.8883 479.00 474.00 5.00 394671 ZEP 2015 09 03 03 05 00 4675-99 P co CCGG 97.130 -999.990 ... V4 2015 09 30 11 51 00 78.9067 11.8883 479.00 474.00 5.00 394672 ZEP 2015 09 03 03 05 00 4676-99 P co CCGG 96.830 -999.990 ... V4 2015 09 30 12 07 00 78.9067 11.8883 479.00 474.00 5.00 394673 ZEP 2015 09 10 09 25 00 465-99 P co CCGG 97.000 -999.990 ... V4 2015 10 19 14 35 00 78.9067 11.8883 479.00 474.00 5.00 395631 ZEP 2015 09 10 09 25 00 466-99 P co CCGG 97.190 -999.990 ... V4 2015 10 19 14 51 00 78.9067 11.8883 479.00 474.00 5.00 395632 ZEP 2015 09 17 08 50 00 4245-99 P co CCGG 103.200 -999.990 ... V4 2015 10 19 14 03 00 78.9067 11.8883 479.00 474.00 5.00 395633 ZEP 2015 09 17 08 50 00 4246-99 P co CCGG 102.580 -999.990 ... V4 2015 10 19 14 19 00 78.9067 11.8883 479.00 474.00 5.00 395634 ZEP 2015 09 24 08 10 00 4973-99 P co CCGG 109.260 -999.990 ... V4 2015 10 26 15 04 00 78.9067 11.8883 479.00 474.00 5.00 396238 ZEP 2015 09 24 08 10 00 4974-99 P co CCGG 109.550 -999.990 ... V4 2015 10 26 15 20 00 78.9067 11.8883 479.00 474.00 5.00 396239 ZEP 2015 10 01 07 39 00 3191-99 P co CCGG 106.880 -999.990 ... V4 2015 10 26 14 33 00 78.9067 11.8883 479.00 474.00 5.00 396240 ZEP 2015 10 01 07 39 00 3192-99 P co CCGG 106.560 -999.990 ... V4 2015 10 26 14 48 00 78.9067 11.8883 479.00 474.00 5.00 396241 ZEP 2015 10 08 12 34 56 2541-99 P co CCGG 111.140 -999.990 ... V4 2015 11 04 11 04 00 78.9067 11.8883 479.00 474.00 5.00 396991 ZEP 2015 10 08 12 34 56 2542-99 P co CCGG 111.340 -999.990 ... V4 2015 11 04 11 20 00 78.9067 11.8883 479.00 474.00 5.00 396992 ZEP 2015 10 15 07 56 00 3649-99 P co CCGG 107.760 -999.990 ... V4 2015 11 04 11 36 00 78.9067 11.8883 479.00 474.00 5.00 396989 ZEP 2015 10 15 07 56 00 3650-99 P co CCGG 106.540 -999.990 ... V4 2015 11 04 11 52 00 78.9067 11.8883 479.00 474.00 5.00 396990 ZEP 2015 10 22 08 09 00 1953-99 P co CCGG 111.020 -999.990 ... V4 2015 11 18 13 18 00 78.9067 11.8883 479.00 474.00 5.00 397735 ZEP 2015 10 22 08 09 00 1954-99 P co CCGG 110.900 -999.990 ... V4 2015 11 18 13 34 00 78.9067 11.8883 479.00 474.00 5.00 397734 ZEP 2015 10 29 09 40 00 5341-99 P co CCGG 108.740 -999.990 ... V4 2015 11 18 13 50 00 78.9067 11.8883 479.00 474.00 5.00 397736 ZEP 2015 10 29 09 40 00 5342-99 P co CCGG 108.650 -999.990 ... V4 2015 11 18 14 05 00 78.9067 11.8883 479.00 474.00 5.00 397737 ZEP 2015 11 05 08 40 00 2637-99 P co CCGG 111.920 -999.990 ... V4 2015 12 03 13 15 00 78.9067 11.8883 479.00 474.00 5.00 398412 ZEP 2015 11 05 08 40 00 2638-99 P co CCGG 111.200 -999.990 ... V4 2015 12 03 13 30 00 78.9067 11.8883 479.00 474.00 5.00 398413 ZEP 2015 11 12 08 38 00 3535-99 P co CCGG 125.310 -999.990 ... V4 2015 12 03 13 46 00 78.9067 11.8883 479.00 474.00 5.00 398411 ZEP 2015 11 12 08 38 00 3536-99 P co CCGG 125.190 -999.990 ... V4 2015 12 03 14 02 00 78.9067 11.8883 479.00 474.00 5.00 398410 ZEP 2015 11 19 08 53 00 2453-99 P co CCGG 123.270 -999.990 ... V4 2015 12 29 12 14 00 78.9067 11.8883 479.00 474.00 5.00 398979 ZEP 2015 11 19 08 53 00 2454-99 P co CCGG 122.750 -999.990 ... V4 2015 12 29 12 30 00 78.9067 11.8883 479.00 474.00 5.00 398980 ZEP 2015 11 26 09 40 00 641-99 P co CCGG 126.520 -999.990 ... V4 2015 12 29 11 42 00 78.9067 11.8883 479.00 474.00 5.00 398981 ZEP 2015 11 26 09 40 00 642-99 P co CCGG 127.110 -999.990 ... V4 2015 12 29 11 58 00 78.9067 11.8883 479.00 474.00 5.00 398982 ZEP 2015 12 03 08 00 00 2017-99 P co CCGG 146.050 -999.990 .X. V4 2016 01 11 11 10 00 78.9067 11.8883 479.00 474.00 5.00 399824 ZEP 2015 12 03 08 00 00 2018-99 P co CCGG 146.840 -999.990 .X. V4 2016 01 11 11 26 00 78.9067 11.8883 479.00 474.00 5.00 399825 ZEP 2015 12 10 09 20 00 757-99 P co CCGG 129.800 -999.990 ... V4 2016 01 11 11 41 00 78.9067 11.8883 479.00 474.00 5.00 399822 ZEP 2015 12 10 09 20 00 758-99 P co CCGG 130.160 -999.990 ... V4 2016 01 11 11 57 00 78.9067 11.8883 479.00 474.00 5.00 399823 ZEP 2015 12 17 08 20 00 3485-99 P co CCGG 128.390 -999.990 ... V4 2016 01 29 14 50 00 78.9067 11.8883 479.00 474.00 5.00 401185 ZEP 2015 12 17 08 20 00 3486-99 P co CCGG 127.690 -999.990 ... V4 2016 01 29 15 06 00 78.9067 11.8883 479.00 474.00 5.00 401186 ZEP 2015 12 24 09 10 00 2711-99 P co CCGG 129.460 -999.990 ... V4 2016 01 29 14 19 00 78.9067 11.8883 479.00 474.00 5.00 401189 ZEP 2015 12 24 09 10 00 2712-99 P co CCGG 130.330 -999.990 ... V4 2016 01 29 14 34 00 78.9067 11.8883 479.00 474.00 5.00 401190 ZEP 2016 01 01 07 47 00 1443-99 P co CCGG 129.420 -999.990 ... V4 2016 02 09 10 19 00 78.9067 11.8883 479.00 474.00 5.00 401406 ZEP 2016 01 01 07 47 00 1444-99 P co CCGG 128.820 -999.990 ... V4 2016 02 09 10 35 00 78.9067 11.8883 479.00 474.00 5.00 401407 ZEP 2016 01 07 09 20 00 2651-99 P co CCGG 131.810 -999.990 ... V4 2016 02 09 10 51 00 78.9067 11.8883 479.00 474.00 5.00 401408 ZEP 2016 01 07 09 20 00 2652-99 P co CCGG 131.340 -999.990 ... V4 2016 02 09 11 07 00 78.9067 11.8883 479.00 474.00 5.00 401409 ZEP 2016 01 14 08 20 00 2885-99 P co CCGG 136.980 -999.990 ... V4 2016 02 17 12 42 00 78.9067 11.8883 479.00 474.00 5.00 402081 ZEP 2016 01 14 08 20 00 2886-99 P co CCGG 137.570 -999.990 ... V4 2016 02 17 12 58 00 78.9067 11.8883 479.00 474.00 5.00 402082 ZEP 2016 01 21 08 37 00 5243-99 P co CCGG 136.870 -999.990 ... V4 2016 02 17 12 10 00 78.9067 11.8883 479.00 474.00 5.00 402079 ZEP 2016 01 21 08 37 00 5244-99 P co CCGG 137.210 -999.990 ... V4 2016 02 17 12 26 00 78.9067 11.8883 479.00 474.00 5.00 402080 ZEP 2016 01 28 08 50 00 3529-99 P co CCGG 162.400 -999.990 ... V4 2016 02 23 17 42 00 78.9067 11.8883 479.00 474.00 5.00 402527 ZEP 2016 01 28 08 50 00 3530-99 P co CCGG 162.690 -999.990 ... V4 2016 02 23 17 57 00 78.9067 11.8883 479.00 474.00 5.00 402528 ZEP 2016 02 04 09 15 00 4239-99 P co CCGG 176.000 -999.990 .X. V4 2016 03 01 11 35 00 78.9067 11.8883 479.00 474.00 5.00 402821 ZEP 2016 02 04 09 15 00 4240-99 P co CCGG 174.500 -999.990 .X. V4 2016 03 01 11 51 00 78.9067 11.8883 479.00 474.00 5.00 402822 ZEP 2016 02 11 08 26 00 3417-99 P co CCGG 157.000 -999.990 ... V4 2016 03 09 14 21 00 78.9067 11.8883 479.00 474.00 5.00 403266 ZEP 2016 02 11 08 26 00 3418-99 P co CCGG 157.150 -999.990 ... V4 2016 03 09 14 36 00 78.9067 11.8883 479.00 474.00 5.00 403267 ZEP 2016 02 18 08 35 00 3283-99 P co CCGG 145.830 -999.990 ... V4 2016 03 09 14 56 00 78.9067 11.8883 479.00 474.00 5.00 403264 ZEP 2016 02 18 08 35 00 3284-99 P co CCGG 145.310 -999.990 ... V4 2016 03 09 15 11 00 78.9067 11.8883 479.00 474.00 5.00 403265 ZEP 2016 02 25 08 35 00 4107-99 P co CCGG 157.950 -999.990 ... V4 2016 03 25 11 54 00 78.9067 11.8883 479.00 474.00 5.00 403868 ZEP 2016 02 25 08 35 00 4108-99 P co CCGG 158.660 -999.990 ... V4 2016 03 25 12 10 00 78.9067 11.8883 479.00 474.00 5.00 403869 ZEP 2016 03 03 08 30 00 885-99 P co CCGG 144.850 -999.990 ... V4 2016 03 25 11 22 00 78.9067 11.8883 479.00 474.00 5.00 403866 ZEP 2016 03 03 08 30 00 886-99 P co CCGG 145.470 -999.990 ... V4 2016 03 25 11 38 00 78.9067 11.8883 479.00 474.00 5.00 403867 ZEP 2016 03 10 08 25 00 1071-99 P co CCGG 157.340 -999.990 ... V4 2016 04 11 14 01 00 78.9067 11.8883 479.00 474.00 5.00 404848 ZEP 2016 03 10 08 25 00 1072-99 P co CCGG 157.170 -999.990 ... V4 2016 04 11 14 16 00 78.9067 11.8883 479.00 474.00 5.00 404849 ZEP 2016 03 17 09 05 00 3885-99 P co CCGG 146.100 -999.990 ... V4 2016 04 11 14 34 00 78.9067 11.8883 479.00 474.00 5.00 404850 ZEP 2016 03 17 09 05 00 3886-99 P co CCGG 147.180 -999.990 ... V4 2016 04 11 14 50 00 78.9067 11.8883 479.00 474.00 5.00 404851 ZEP 2016 03 18 08 18 00 847-99 P co CCGG 147.080 -999.990 ... V4 2016 04 19 11 00 00 78.9067 11.8883 479.00 474.00 5.00 405363 ZEP 2016 03 18 08 18 00 848-99 P co CCGG 148.020 -999.990 ... V4 2016 04 19 11 16 00 78.9067 11.8883 479.00 474.00 5.00 405364 ZEP 2016 03 24 11 16 00 229-99 P co CCGG 163.900 -999.990 ... V4 2016 04 19 10 28 00 78.9067 11.8883 479.00 474.00 5.00 405361 ZEP 2016 03 24 11 16 00 230-99 P co CCGG 164.830 -999.990 ... V4 2016 04 19 10 44 00 78.9067 11.8883 479.00 474.00 5.00 405362 ZEP 2016 03 31 07 51 00 1797-99 P co CCGG 155.590 -999.990 ... V4 2016 05 11 10 09 00 78.9067 11.8883 479.00 474.00 5.00 406533 ZEP 2016 03 31 07 51 00 1798-99 P co CCGG 152.670 -999.990 ... V4 2016 05 11 10 25 00 78.9067 11.8883 479.00 474.00 5.00 406534 ZEP 2016 04 07 12 15 00 851-99 P co CCGG 141.300 -999.990 ... V4 2016 05 11 10 40 00 78.9067 11.8883 479.00 474.00 5.00 406531 ZEP 2016 04 07 12 15 00 852-99 P co CCGG 142.150 -999.990 ... V4 2016 05 11 10 56 00 78.9067 11.8883 479.00 474.00 5.00 406532 ZEP 2016 04 14 08 20 00 2363-99 P co CCGG 147.950 -999.990 ... V4 2016 06 15 13 17 00 78.9067 11.8883 479.00 474.00 5.00 407927 ZEP 2016 04 14 08 20 00 2364-99 P co CCGG 147.710 -999.990 ... V4 2016 06 15 13 33 00 78.9067 11.8883 479.00 474.00 5.00 407928 ZEP 2016 04 21 09 41 00 5111-99 P co CCGG 143.070 -999.990 ... V4 2016 06 15 13 49 00 78.9067 11.8883 479.00 474.00 5.00 407925 ZEP 2016 04 21 09 41 00 5112-99 P co CCGG 142.310 -999.990 ... V4 2016 06 15 14 04 00 78.9067 11.8883 479.00 474.00 5.00 407926 ZEP 2016 04 28 07 55 00 1261-99 P co CCGG 135.670 -999.990 ... V4 2016 06 17 10 49 00 78.9067 11.8883 479.00 474.00 5.00 408334 ZEP 2016 04 28 07 55 00 1262-99 P co CCGG 135.500 -999.990 ... V4 2016 06 17 11 05 00 78.9067 11.8883 479.00 474.00 5.00 408335 ZEP 2016 05 05 07 55 00 1121-99 P co CCGG 133.350 -999.990 ... V4 2016 06 22 13 24 00 78.9067 11.8883 479.00 474.00 5.00 409331 ZEP 2016 05 05 07 55 00 1122-99 P co CCGG 131.680 -999.990 ... V4 2016 06 22 13 39 00 78.9067 11.8883 479.00 474.00 5.00 409332 ZEP 2016 05 12 08 26 00 3419-99 P co CCGG 125.630 -999.990 ... V4 2016 06 16 16 01 00 78.9067 11.8883 479.00 474.00 5.00 408429 ZEP 2016 05 12 08 26 00 3420-99 P co CCGG 125.410 -999.990 ... V4 2016 06 16 16 17 00 78.9067 11.8883 479.00 474.00 5.00 408430 ZEP 2016 05 19 09 30 00 3629-99 P co CCGG 125.540 -999.990 ... V4 2016 06 16 16 33 00 78.9067 11.8883 479.00 474.00 5.00 408431 ZEP 2016 05 19 09 30 00 3630-99 P co CCGG 127.070 -999.990 ... V4 2016 06 16 16 49 00 78.9067 11.8883 479.00 474.00 5.00 408432 ZEP 2016 05 26 08 17 00 1225-99 P co CCGG 114.990 -999.990 ... V4 2016 06 29 13 26 00 78.9067 11.8883 479.00 474.00 5.00 409280 ZEP 2016 05 26 08 17 00 1226-99 P co CCGG 115.080 -999.990 ... V4 2016 06 29 13 42 00 78.9067 11.8883 479.00 474.00 5.00 409281 ZEP 2016 06 02 07 40 00 3151-99 P co CCGG 111.710 -999.990 ... V4 2016 06 29 12 54 00 78.9067 11.8883 479.00 474.00 5.00 409282 ZEP 2016 06 02 07 40 00 3152-99 P co CCGG 111.310 -999.990 ... V4 2016 06 29 13 10 00 78.9067 11.8883 479.00 474.00 5.00 409283 ZEP 2016 06 09 07 41 00 131-99 P co CCGG 99.940 -999.990 ... V4 2016 07 15 11 50 00 78.9067 11.8883 479.00 474.00 5.00 410135 ZEP 2016 06 09 07 41 00 132-99 P co CCGG 100.090 -999.990 ... V4 2016 07 15 12 06 00 78.9067 11.8883 479.00 474.00 5.00 410136 ZEP 2016 06 16 07 55 00 4065-99 P co CCGG 100.380 -999.990 ... V4 2016 07 15 11 19 00 78.9067 11.8883 479.00 474.00 5.00 410133 ZEP 2016 06 16 07 55 00 4066-99 P co CCGG 99.870 -999.990 ... V4 2016 07 15 11 34 00 78.9067 11.8883 479.00 474.00 5.00 410134 ZEP 2016 06 23 08 10 00 2017-99 P co CCGG 92.300 -999.990 ... V4 2016 07 28 12 58 00 78.9067 11.8883 479.00 474.00 5.00 411183 ZEP 2016 06 23 08 10 00 2018-99 P co CCGG 90.550 -999.990 ... V4 2016 07 28 13 14 00 78.9067 11.8883 479.00 474.00 5.00 411184 ZEP 2016 06 30 07 50 00 2713-99 P co CCGG 86.640 -999.990 ... V4 2016 07 28 13 30 00 78.9067 11.8883 479.00 474.00 5.00 411181 ZEP 2016 06 30 07 50 00 2714-99 P co CCGG 88.540 -999.990 ... V4 2016 07 28 13 46 00 78.9067 11.8883 479.00 474.00 5.00 411182 ZEP 2016 07 07 07 55 00 3529-99 P co CCGG 83.110 -999.990 ... V4 2016 08 02 09 21 00 78.9067 11.8883 479.00 474.00 5.00 411372 ZEP 2016 07 07 07 55 00 3530-99 P co CCGG 83.230 -999.990 ... V4 2016 08 02 09 37 00 78.9067 11.8883 479.00 474.00 5.00 411373 ZEP 2016 07 14 08 10 00 1277-99 P co CCGG 110.400 -999.990 .X. V4 2016 08 01 15 16 00 78.9067 11.8883 479.00 474.00 5.00 411374 ZEP 2016 07 15 08 50 00 1159-99 P co CCGG 108.330 -999.990 .X. V4 2016 08 10 15 54 00 78.9067 11.8883 479.00 474.00 5.00 411658 ZEP 2016 07 15 08 50 00 1160-99 P co CCGG 108.540 -999.990 .X. V4 2016 08 10 16 10 00 78.9067 11.8883 479.00 474.00 5.00 411659 ZEP 2016 07 21 07 55 00 4533-99 P co CCGG 90.190 -999.990 ... V4 2016 08 10 15 22 00 78.9067 11.8883 479.00 474.00 5.00 411656 ZEP 2016 07 21 07 55 00 4534-99 P co CCGG 90.550 -999.990 ... V4 2016 08 10 15 38 00 78.9067 11.8883 479.00 474.00 5.00 411657 ZEP 2016 07 28 08 12 00 207-99 P co CCGG 80.140 -999.990 ... V4 2016 08 23 10 33 00 78.9067 11.8883 479.00 474.00 5.00 412676 ZEP 2016 07 28 08 12 00 208-99 P co CCGG 80.780 -999.990 ... V4 2016 08 23 10 48 00 78.9067 11.8883 479.00 474.00 5.00 412677 ZEP 2016 08 04 08 33 00 5177-99 P co CCGG 78.010 -999.990 ... V4 2016 08 23 10 01 00 78.9067 11.8883 479.00 474.00 5.00 412678 ZEP 2016 08 04 08 33 00 5178-99 P co CCGG 78.670 -999.990 ... V4 2016 08 23 10 17 00 78.9067 11.8883 479.00 474.00 5.00 412679 ZEP 2016 08 11 07 45 00 89-99 P co CCGG 84.640 -999.990 ... V4 2016 09 09 16 23 00 78.9067 11.8883 479.00 474.00 5.00 413636 ZEP 2016 08 11 07 45 00 90-99 P co CCGG 82.500 -999.990 ... V4 2016 09 09 16 39 00 78.9067 11.8883 479.00 474.00 5.00 413637 ZEP 2016 08 18 08 48 00 1399-99 P co CCGG 92.240 -999.990 ... V4 2016 09 09 16 55 00 78.9067 11.8883 479.00 474.00 5.00 413638 ZEP 2016 08 18 08 48 00 1400-99 P co CCGG 92.480 -999.990 ... V4 2016 09 09 17 11 00 78.9067 11.8883 479.00 474.00 5.00 413639 ZEP 2016 08 25 08 30 00 3463-99 P co CCGG 89.050 -999.990 ... V4 2016 10 05 13 04 00 78.9067 11.8883 479.00 474.00 5.00 414527 ZEP 2016 08 25 08 30 00 3464-99 P co CCGG 88.780 -999.990 ... V4 2016 10 05 13 20 00 78.9067 11.8883 479.00 474.00 5.00 414528 ZEP 2016 09 01 08 00 00 5613-99 P co CCGG 94.660 -999.990 ... V4 2016 10 05 15 43 00 78.9067 11.8883 479.00 474.00 5.00 414529 ZEP 2016 09 01 08 00 00 5614-99 P co CCGG 93.720 -999.990 ... V4 2016 10 05 15 59 00 78.9067 11.8883 479.00 474.00 5.00 414530 ZEP 2016 09 08 08 15 00 5699-99 P co CCGG 95.590 -999.990 ... V4 2016 10 05 15 11 00 78.9067 11.8883 479.00 474.00 5.00 414532 ZEP 2016 09 08 08 15 00 5700-99 P co CCGG 95.450 -999.990 ... V4 2016 10 05 15 27 00 78.9067 11.8883 479.00 474.00 5.00 414531 ZEP 2016 09 15 12 25 00 2251-99 P co CCGG 89.590 -999.990 A.. V4 2016 10 14 16 04 00 78.9067 11.8883 479.00 474.00 5.00 415158 ZEP 2016 09 15 12 25 00 2251-99 P co CCGG 96.720 -999.990 ... V4 2016 10 17 12 39 00 78.9067 11.8883 479.00 474.00 5.00 415158 ZEP 2016 09 15 12 25 00 2252-99 P co CCGG 147.230 -999.990 A.. V4 2016 10 14 16 20 00 78.9067 11.8883 479.00 474.00 5.00 415159 ZEP 2016 09 15 12 25 00 2252-99 P co CCGG 97.040 -999.990 ... V4 2016 10 17 14 14 00 78.9067 11.8883 479.00 474.00 5.00 415159 ZEP 2016 09 22 07 45 00 5435-99 P co CCGG 154.840 -999.990 A.. V4 2016 10 14 16 36 00 78.9067 11.8883 479.00 474.00 5.00 415156 ZEP 2016 09 22 07 45 00 5435-99 P co CCGG 98.360 -999.990 A.. V4 2016 10 17 14 30 00 78.9067 11.8883 479.00 474.00 5.00 415156 ZEP 2016 09 22 07 45 00 5436-99 P co CCGG 164.730 -999.990 A.. V4 2016 10 14 16 52 00 78.9067 11.8883 479.00 474.00 5.00 415157 ZEP 2016 09 22 07 45 00 5436-99 P co CCGG 93.060 -999.990 ... V4 2016 10 17 12 55 00 78.9067 11.8883 479.00 474.00 5.00 415157 ZEP 2016 09 29 08 00 00 5209-99 P co CCGG 97.060 -999.990 ... V4 2016 11 04 08 54 00 78.9067 11.8883 479.00 474.00 5.00 416130 ZEP 2016 10 06 07 45 00 539-99 P co CCGG 100.480 -999.990 ... V4 2016 11 04 09 10 00 78.9067 11.8883 479.00 474.00 5.00 416128 ZEP 2016 10 06 07 45 00 540-99 P co CCGG 98.750 -999.990 ... V4 2016 11 04 09 26 00 78.9067 11.8883 479.00 474.00 5.00 416129 ZEP 2016 10 13 07 50 00 1667-99 P co CCGG 104.560 -999.990 ... V4 2016 11 16 11 48 00 78.9067 11.8883 479.00 474.00 5.00 416619 ZEP 2016 10 13 07 50 00 1668-99 P co CCGG 103.780 -999.990 ... V4 2016 11 16 12 04 00 78.9067 11.8883 479.00 474.00 5.00 416620 ZEP 2016 10 20 08 13 00 1625-99 P co CCGG 115.430 -999.990 ... V4 2016 11 15 13 21 00 78.9067 11.8883 479.00 474.00 5.00 416573 ZEP 2016 10 20 08 13 00 1626-99 P co CCGG 114.420 -999.990 ... V4 2016 11 15 13 37 00 78.9067 11.8883 479.00 474.00 5.00 416574 ZEP 2016 10 27 07 37 00 1851-99 P co CCGG 142.970 -999.990 .X. V4 2016 11 28 10 45 00 78.9067 11.8883 479.00 474.00 5.00 417105 ZEP 2016 10 27 07 37 00 1852-99 P co CCGG 143.300 -999.990 .X. V4 2016 11 28 11 01 00 78.9067 11.8883 479.00 474.00 5.00 417106 ZEP 2016 11 03 08 35 00 4419-99 P co CCGG 112.200 -999.990 ... V4 2016 11 28 11 17 00 78.9067 11.8883 479.00 474.00 5.00 417107 ZEP 2016 11 03 08 35 00 4420-99 P co CCGG 111.450 -999.990 ... V4 2016 11 28 11 33 00 78.9067 11.8883 479.00 474.00 5.00 417108 ZEP 2016 11 10 08 59 00 5117-99 P co CCGG 114.140 -999.990 ... V4 2016 12 09 09 04 00 78.9067 11.8883 479.00 474.00 5.00 417689 ZEP 2016 11 10 08 59 00 5118-99 P co CCGG 114.890 -999.990 ... V4 2016 12 09 09 20 00 78.9067 11.8883 479.00 474.00 5.00 417690 ZEP 2016 11 17 08 36 00 747-99 P co CCGG 115.740 -999.990 ... V4 2016 12 09 09 36 00 78.9067 11.8883 479.00 474.00 5.00 417691 ZEP 2016 11 17 08 36 00 748-99 P co CCGG 115.570 -999.990 ... V4 2016 12 09 09 52 00 78.9067 11.8883 479.00 474.00 5.00 417692 ZEP 2016 11 23 08 50 00 5294-99 P co CCGG 137.190 -999.990 ... V4 2016 12 29 10 28 00 78.9067 11.8883 479.00 474.00 5.00 418430 ZEP 2016 12 01 09 39 00 5403-99 P co CCGG 134.920 -999.990 ... V4 2016 12 27 13 54 00 78.9067 11.8883 479.00 474.00 5.00 418431 ZEP 2016 12 01 09 39 00 5404-99 P co CCGG 135.030 -999.990 ... V4 2016 12 27 14 09 00 78.9067 11.8883 479.00 474.00 5.00 418432 ZEP 2016 12 08 08 57 00 3795-99 P co CCGG 121.180 -999.990 ... V4 2017 01 27 16 28 00 78.9067 11.8883 479.00 474.00 5.00 419571 ZEP 2016 12 08 08 57 00 3796-99 P co CCGG 121.520 -999.990 ... V4 2017 01 27 16 44 00 78.9067 11.8883 479.00 474.00 5.00 419572 ZEP 2016 12 15 08 32 00 2713-99 P co CCGG 122.390 -999.990 ... V4 2017 01 27 15 56 00 78.9067 11.8883 479.00 474.00 5.00 419567 ZEP 2016 12 15 08 32 00 2714-99 P co CCGG 121.730 -999.990 ... V4 2017 01 27 16 12 00 78.9067 11.8883 479.00 474.00 5.00 419568 ZEP 2016 12 22 09 45 00 3357-99 P co CCGG 125.890 -999.990 ... V4 2017 01 30 10 16 00 78.9067 11.8883 479.00 474.00 5.00 419569 ZEP 2016 12 22 09 45 00 3358-99 P co CCGG 127.200 -999.990 ... V4 2017 01 30 10 32 00 78.9067 11.8883 479.00 474.00 5.00 419570 ZEP 2016 12 30 14 00 00 3831-99 P co CCGG 154.530 -999.990 .X. V4 2017 01 27 17 00 00 78.9067 11.8883 479.00 474.00 5.00 419565 ZEP 2016 12 30 14 00 00 3832-99 P co CCGG 155.320 -999.990 .X. V4 2017 01 27 17 16 00 78.9067 11.8883 479.00 474.00 5.00 419566 ZEP 2017 01 05 09 40 00 3195-99 P co CCGG 127.610 -999.990 ... V4 2017 02 09 10 37 00 78.9067 11.8883 479.00 474.00 5.00 420163 ZEP 2017 01 05 09 40 00 3196-99 P co CCGG 125.630 -999.990 ... V4 2017 02 09 10 53 00 78.9067 11.8883 479.00 474.00 5.00 420164 ZEP 2017 01 12 09 00 00 5593-99 P co CCGG 135.880 -999.990 ... V4 2017 02 08 12 56 00 78.9067 11.8883 479.00 474.00 5.00 420161 ZEP 2017 01 12 09 00 00 5594-99 P co CCGG 135.300 -999.990 ... V4 2017 02 08 13 12 00 78.9067 11.8883 479.00 474.00 5.00 420162 ZEP 2017 01 19 08 45 00 5361-99 P co CCGG 137.430 -999.990 ... V4 2017 02 24 12 17 00 78.9067 11.8883 479.00 474.00 5.00 421115 ZEP 2017 01 19 08 45 00 5362-99 P co CCGG 137.180 -999.990 ... V4 2017 02 24 12 33 00 78.9067 11.8883 479.00 474.00 5.00 421116 ZEP 2017 01 26 10 15 00 5681-99 P co CCGG 146.300 -999.990 ... V4 2017 02 24 11 45 00 78.9067 11.8883 479.00 474.00 5.00 421113 ZEP 2017 01 26 10 15 00 5682-99 P co CCGG 148.320 -999.990 ... V4 2017 02 24 12 01 00 78.9067 11.8883 479.00 474.00 5.00 421114 ZEP 2017 02 02 08 50 00 1539-99 P co CCGG 137.270 -999.990 ... V4 2017 03 06 12 02 00 78.9067 11.8883 479.00 474.00 5.00 421574 ZEP 2017 02 02 08 50 00 1540-99 P co CCGG 137.130 -999.990 ... V4 2017 03 06 12 18 00 78.9067 11.8883 479.00 474.00 5.00 421575 ZEP 2017 02 09 09 08 00 4061-99 P co CCGG 174.590 -999.990 .X. V4 2017 03 06 11 31 00 78.9067 11.8883 479.00 474.00 5.00 421576 ZEP 2017 02 09 09 08 00 4062-99 P co CCGG 173.760 -999.990 .X. V4 2017 03 06 11 47 00 78.9067 11.8883 479.00 474.00 5.00 421577 ZEP 2017 02 16 08 34 00 5081-99 P co CCGG 138.180 -999.990 ... V4 2017 03 24 13 45 00 78.9067 11.8883 479.00 474.00 5.00 422584 ZEP 2017 02 16 08 34 00 5082-99 P co CCGG 137.200 -999.990 ... V4 2017 03 24 14 01 00 78.9067 11.8883 479.00 474.00 5.00 422585 ZEP 2017 02 23 09 14 00 159-99 P co CCGG 162.290 -999.990 .X. V4 2017 03 24 14 17 00 78.9067 11.8883 479.00 474.00 5.00 422582 ZEP 2017 02 23 09 14 00 160-99 P co CCGG 163.810 -999.990 .X. V4 2017 03 24 14 33 00 78.9067 11.8883 479.00 474.00 5.00 422583 ZEP 2017 03 02 09 07 00 5427-99 P co CCGG 140.900 -999.990 ... V4 2017 04 06 17 26 00 78.9067 11.8883 479.00 474.00 5.00 423331 ZEP 2017 03 02 09 07 00 5428-99 P co CCGG 141.310 -999.990 ... V4 2017 04 06 17 41 00 78.9067 11.8883 479.00 474.00 5.00 423332 ZEP 2017 03 09 08 29 00 4557-99 P co CCGG 141.500 -999.990 ... V4 2017 04 06 16 54 00 78.9067 11.8883 479.00 474.00 5.00 423329 ZEP 2017 03 09 08 29 00 4558-99 P co CCGG 141.270 -999.990 ... V4 2017 04 06 17 10 00 78.9067 11.8883 479.00 474.00 5.00 423330 ZEP 2017 03 16 08 54 00 4701-99 P co CCGG 149.360 -999.990 ... V4 2017 05 11 10 33 00 78.9067 11.8883 479.00 474.00 5.00 424958 ZEP 2017 03 16 08 54 00 4702-99 P co CCGG 149.000 -999.990 ... V4 2017 05 11 10 49 00 78.9067 11.8883 479.00 474.00 5.00 424959 ZEP 2017 03 23 08 41 00 4085-99 P co CCGG 149.370 -999.990 ... V4 2017 05 15 16 33 00 78.9067 11.8883 479.00 474.00 5.00 425288 ZEP 2017 03 23 08 41 00 4086-99 P co CCGG 148.350 -999.990 ... V4 2017 05 15 16 49 00 78.9067 11.8883 479.00 474.00 5.00 425289 ZEP 2017 03 30 07 50 00 5477-99 P co CCGG 144.870 -999.990 ... V2 2017 05 31 12 24 00 78.9067 11.8883 479.00 474.00 5.00 425859 ZEP 2017 03 30 07 50 00 5478-99 P co CCGG 145.210 -999.990 ... V2 2017 05 31 12 40 00 78.9067 11.8883 479.00 474.00 5.00 425860 ZEP 2017 04 06 07 55 00 2737-99 P co CCGG 148.530 -999.990 ... V2 2017 05 31 12 56 00 78.9067 11.8883 479.00 474.00 5.00 425857 ZEP 2017 04 06 07 55 00 2738-99 P co CCGG 148.080 -999.990 ... V2 2017 05 31 13 12 00 78.9067 11.8883 479.00 474.00 5.00 425858 ZEP 2017 04 13 07 33 00 5707-99 P co CCGG 140.030 -999.990 ... V2 2017 05 30 14 26 00 78.9067 11.8883 479.00 474.00 5.00 425823 ZEP 2017 04 13 07 33 00 5708-99 P co CCGG 139.240 -999.990 ... V2 2017 05 30 14 42 00 78.9067 11.8883 479.00 474.00 5.00 425824 ZEP 2017 04 20 08 09 00 5431-99 P co CCGG 135.460 -999.990 ... V2 2017 05 31 13 28 00 78.9067 11.8883 479.00 474.00 5.00 425861 ZEP 2017 04 20 08 09 00 5432-99 P co CCGG 136.270 -999.990 ... V2 2017 05 31 13 44 00 78.9067 11.8883 479.00 474.00 5.00 425862 ZEP 2017 04 27 07 55 00 4197-99 P co CCGG 128.850 -999.990 ... V2 2017 05 31 11 53 00 78.9067 11.8883 479.00 474.00 5.00 425855 ZEP 2017 04 27 07 55 00 4198-99 P co CCGG 129.580 -999.990 ... V2 2017 05 31 12 09 00 78.9067 11.8883 479.00 474.00 5.00 425856 ZEP 2017 05 04 07 57 00 3135-99 P co CCGG 124.840 -999.990 ... V2 2017 05 31 11 21 00 78.9067 11.8883 479.00 474.00 5.00 425853 ZEP 2017 05 04 07 57 00 3136-99 P co CCGG 124.510 -999.990 ... V2 2017 05 31 11 37 00 78.9067 11.8883 479.00 474.00 5.00 425854 ZEP 2017 05 11 07 36 00 5341-99 P co CCGG 120.970 -999.990 ... V2 2017 06 12 15 54 00 78.9067 11.8883 479.00 474.00 5.00 426386 ZEP 2017 05 11 07 36 00 5342-99 P co CCGG 121.150 -999.990 ... V2 2017 06 12 16 10 00 78.9067 11.8883 479.00 474.00 5.00 426387 ZEP 2017 05 18 07 45 00 1261-99 P co CCGG 116.080 -999.990 ... V2 2017 06 12 14 49 00 78.9067 11.8883 479.00 474.00 5.00 426388 ZEP 2017 05 18 07 45 00 1262-99 P co CCGG 116.540 -999.990 ... V2 2017 06 12 15 05 00 78.9067 11.8883 479.00 474.00 5.00 426389 ZEP 2017 05 25 07 35 00 3099-99 P co CCGG 109.820 -999.990 ... V2 2017 06 22 09 09 00 78.9067 11.8883 479.00 474.00 5.00 427117 ZEP 2017 05 25 07 35 00 3100-99 P co CCGG 110.520 -999.990 ... V2 2017 06 22 09 24 00 78.9067 11.8883 479.00 474.00 5.00 427118 ZEP 2017 06 01 08 42 00 2065-99 P co CCGG 104.330 -999.990 ... V2 2017 06 22 09 40 00 78.9067 11.8883 479.00 474.00 5.00 427119 ZEP 2017 06 01 08 42 00 2066-99 P co CCGG 104.700 -999.990 ... V2 2017 06 22 09 56 00 78.9067 11.8883 479.00 474.00 5.00 427120 ZEP 2017 06 08 07 26 00 5531-99 P co CCGG 101.370 -999.990 ... V2 2017 07 18 13 43 00 78.9067 11.8883 479.00 474.00 5.00 427815 ZEP 2017 06 08 07 26 00 5532-99 P co CCGG 100.690 -999.990 ... V2 2017 07 18 13 59 00 78.9067 11.8883 479.00 474.00 5.00 427816 ZEP 2017 06 15 07 38 00 5155-99 P co CCGG 89.420 -999.990 ... V2 2017 07 18 13 12 00 78.9067 11.8883 479.00 474.00 5.00 427817 ZEP 2017 06 15 07 38 00 5156-99 P co CCGG 89.610 -999.990 ... V2 2017 07 18 13 28 00 78.9067 11.8883 479.00 474.00 5.00 427818 ZEP 2017 06 22 08 23 00 5591-99 P co CCGG 84.620 -999.990 ... V2 2017 07 24 15 05 00 78.9067 11.8883 479.00 474.00 5.00 428178 ZEP 2017 06 22 08 23 00 5592-99 P co CCGG 84.670 -999.990 ... V2 2017 07 24 15 21 00 78.9067 11.8883 479.00 474.00 5.00 428179 ZEP 2017 06 29 07 53 00 4959-99 P co CCGG 80.200 -999.990 ... V2 2017 07 25 16 12 00 78.9067 11.8883 479.00 474.00 5.00 428166 ZEP 2017 06 29 07 53 00 4960-99 P co CCGG 80.110 -999.990 ... V2 2017 07 25 16 28 00 78.9067 11.8883 479.00 474.00 5.00 428167 ZEP 2017 07 06 07 36 00 2885-99 P co CCGG 75.950 -999.990 ... V2 2017 08 04 15 33 00 78.9067 11.8883 479.00 474.00 5.00 428738 ZEP 2017 07 06 07 36 00 2886-99 P co CCGG 76.140 -999.990 ... V2 2017 08 04 15 49 00 78.9067 11.8883 479.00 474.00 5.00 428739 ZEP 2017 07 13 07 50 00 125-99 P co CCGG 74.250 -999.990 ... V2 2017 08 04 15 01 00 78.9067 11.8883 479.00 474.00 5.00 428736 ZEP 2017 07 13 07 50 00 126-99 P co CCGG 74.390 -999.990 ... V2 2017 08 04 15 17 00 78.9067 11.8883 479.00 474.00 5.00 428737 ZEP 2017 07 20 08 44 00 1083-99 P co CCGG 76.110 -999.990 ... V2 2017 08 21 16 52 00 78.9067 11.8883 479.00 474.00 5.00 429459 ZEP 2017 07 20 08 44 00 1084-99 P co CCGG 77.080 -999.990 ... V2 2017 08 21 17 08 00 78.9067 11.8883 479.00 474.00 5.00 429460 ZEP 2017 07 27 12 34 56 4931-99 P co CCGG 73.380 -999.990 ... V2 2017 08 21 16 36 00 78.9067 11.8883 479.00 474.00 5.00 429457 ZEP 2017 07 27 12 34 56 4932-99 P co CCGG 72.920 -999.990 ... V2 2017 08 21 16 20 00 78.9067 11.8883 479.00 474.00 5.00 429458 ZEP 2017 08 03 07 32 00 3927-99 P co CCGG 76.440 -999.990 ... V2 2017 09 08 12 21 00 78.9067 11.8883 479.00 474.00 5.00 430057 ZEP 2017 08 03 07 32 00 3928-99 P co CCGG 76.890 -999.990 ... V2 2017 09 08 12 37 00 78.9067 11.8883 479.00 474.00 5.00 430058 ZEP 2017 08 10 07 39 00 1203-99 P co CCGG 80.490 -999.990 ... V2 2017 09 08 12 53 00 78.9067 11.8883 479.00 474.00 5.00 430059 ZEP 2017 08 10 07 39 00 1204-99 P co CCGG 80.560 -999.990 ... V2 2017 09 08 13 09 00 78.9067 11.8883 479.00 474.00 5.00 430060 ZEP 2017 08 17 12 04 00 1823-99 P co CCGG 79.240 -999.990 ... V2 2017 09 19 12 07 00 78.9067 11.8883 479.00 474.00 5.00 430774 ZEP 2017 08 17 12 04 00 1824-99 P co CCGG 79.180 -999.990 ... V2 2017 09 19 12 23 00 78.9067 11.8883 479.00 474.00 5.00 430773 ZEP 2017 08 24 07 31 00 4477-99 P co CCGG 87.250 -999.990 ... V2 2017 09 19 12 39 00 78.9067 11.8883 479.00 474.00 5.00 430771 ZEP 2017 08 24 07 31 00 4478-99 P co CCGG 87.620 -999.990 ... V2 2017 09 19 12 55 00 78.9067 11.8883 479.00 474.00 5.00 430772 ZEP 2017 08 31 07 45 00 5297-99 P co CCGG 95.440 -999.990 ... V2 2017 10 02 14 32 00 78.9067 11.8883 479.00 474.00 5.00 431633 ZEP 2017 08 31 07 45 00 5298-99 P co CCGG 95.980 -999.990 ... V2 2017 10 02 14 48 00 78.9067 11.8883 479.00 474.00 5.00 431634 ZEP 2017 09 07 07 35 00 3577-99 P co CCGG 115.320 -999.990 ... V2 2017 10 02 14 00 00 78.9067 11.8883 479.00 474.00 5.00 431631 ZEP 2017 09 07 07 35 00 3578-99 P co CCGG 114.520 -999.990 ... V2 2017 10 02 14 16 00 78.9067 11.8883 479.00 474.00 5.00 431632 ZEP 2017 09 14 12 34 56 3551-99 P co CCGG 107.100 -999.990 ... V2 2017 10 18 16 32 00 78.9067 11.8883 479.00 474.00 5.00 432589 ZEP 2017 09 14 12 34 56 3552-99 P co CCGG 107.020 -999.990 ... V2 2017 10 18 16 48 00 78.9067 11.8883 479.00 474.00 5.00 432590 ZEP 2017 09 21 08 38 00 5559-99 P co CCGG 112.810 -999.990 ... V2 2017 10 18 12 47 00 78.9067 11.8883 479.00 474.00 5.00 432503 ZEP 2017 09 21 08 38 00 5560-99 P co CCGG 112.370 -999.990 ... V2 2017 10 18 13 03 00 78.9067 11.8883 479.00 474.00 5.00 432504 ZEP 2017 09 28 08 40 00 603-99 P co CCGG 150.250 -999.990 .X. V2 2017 11 03 08 58 00 78.9067 11.8883 479.00 474.00 5.00 433325 ZEP 2017 09 28 08 40 00 604-99 P co CCGG 150.950 -999.990 .X. V2 2017 11 03 09 14 00 78.9067 11.8883 479.00 474.00 5.00 433326 ZEP 2017 10 05 08 32 00 5773-99 P co CCGG 117.660 -999.990 ... V2 2017 11 03 08 27 00 78.9067 11.8883 479.00 474.00 5.00 433329 ZEP 2017 10 05 08 32 00 5774-99 P co CCGG 117.480 -999.990 ... V2 2017 11 03 08 43 00 78.9067 11.8883 479.00 474.00 5.00 433330 ZEP 2017 10 12 08 12 00 1843-99 P co CCGG 117.300 -999.990 ... V2 2017 11 09 09 53 00 78.9067 11.8883 479.00 474.00 5.00 433817 ZEP 2017 10 12 08 12 00 1844-99 P co CCGG 117.430 -999.990 ... V2 2017 11 09 10 09 00 78.9067 11.8883 479.00 474.00 5.00 433818 ZEP 2017 10 19 07 40 00 5563-99 P co CCGG 120.730 -999.990 ... V2 2017 11 09 08 50 00 78.9067 11.8883 479.00 474.00 5.00 433819 ZEP 2017 10 19 07 40 00 5564-99 P co CCGG 120.930 -999.990 ... V2 2017 11 09 09 06 00 78.9067 11.8883 479.00 474.00 5.00 433820 ZEP 2017 10 26 07 25 00 3143-99 P co CCGG 114.780 -999.990 ... V2 2017 12 01 10 07 00 78.9067 11.8883 479.00 474.00 5.00 434871 ZEP 2017 10 26 07 25 00 3144-99 P co CCGG 114.410 -999.990 ... V2 2017 12 01 10 23 00 78.9067 11.8883 479.00 474.00 5.00 434872 ZEP 2017 11 02 08 36 00 5775-99 P co CCGG 119.130 -999.990 ... V2 2017 12 01 09 35 00 78.9067 11.8883 479.00 474.00 5.00 434873 ZEP 2017 11 02 08 36 00 5776-99 P co CCGG 119.480 -999.990 ... V2 2017 12 01 09 51 00 78.9067 11.8883 479.00 474.00 5.00 434874 ZEP 2017 11 10 14 11 00 5007-99 P co CCGG 123.910 -999.990 ... V2 2017 12 12 15 44 00 78.9067 11.8883 479.00 474.00 5.00 435436 ZEP 2017 11 10 14 11 00 5008-99 P co CCGG 124.310 -999.990 ... V2 2017 12 12 16 00 00 78.9067 11.8883 479.00 474.00 5.00 435437 ZEP 2017 11 16 08 40 00 4061-99 P co CCGG 136.110 -999.990 ... V2 2017 12 12 15 12 00 78.9067 11.8883 479.00 474.00 5.00 435438 ZEP 2017 11 16 08 40 00 4062-99 P co CCGG 136.400 -999.990 ... V2 2017 12 12 15 28 00 78.9067 11.8883 479.00 474.00 5.00 435439 ZEP 2017 11 23 08 35 00 4089-99 P co CCGG 125.730 -999.990 ... V2 2017 12 13 15 05 00 78.9067 11.8883 479.00 474.00 5.00 435400 ZEP 2017 11 23 08 35 00 4090-99 P co CCGG 126.030 -999.990 ... V2 2017 12 13 15 21 00 78.9067 11.8883 479.00 474.00 5.00 435401 ZEP 2017 11 30 08 45 00 3691-99 P co CCGG 124.420 -999.990 ... V2 2018 02 07 16 26 00 78.9067 11.8883 479.00 474.00 5.00 437914 ZEP 2017 11 30 08 45 00 3692-99 P co CCGG 124.520 -999.990 ... V2 2018 02 07 16 42 00 78.9067 11.8883 479.00 474.00 5.00 437915 ZEP 2017 12 07 08 53 00 103-99 P co CCGG 125.420 -999.990 ... V2 2018 02 07 16 58 00 78.9067 11.8883 479.00 474.00 5.00 437916 ZEP 2017 12 07 08 53 00 104-99 P co CCGG 127.330 -999.990 ... V2 2018 02 07 17 14 00 78.9067 11.8883 479.00 474.00 5.00 437917 ZEP 2017 12 14 08 57 00 4245-99 P co CCGG 151.390 -999.990 .X. V2 2018 02 07 12 44 00 78.9067 11.8883 479.00 474.00 5.00 437698 ZEP 2017 12 14 08 57 00 4246-99 P co CCGG 151.970 -999.990 .X. V2 2018 02 07 13 00 00 78.9067 11.8883 479.00 474.00 5.00 437699 ZEP 2017 12 21 08 40 00 3187-99 P co CCGG 126.710 -999.990 ... V2 2018 02 07 13 16 00 78.9067 11.8883 479.00 474.00 5.00 437700 ZEP 2017 12 21 08 40 00 3188-99 P co CCGG 126.450 -999.990 ... V2 2018 02 07 13 32 00 78.9067 11.8883 479.00 474.00 5.00 437701 ZEP 2017 12 28 08 05 00 5109-99 P co CCGG 127.120 -999.990 ... V2 2018 02 07 14 03 00 78.9067 11.8883 479.00 474.00 5.00 437702 ZEP 2018 01 04 08 59 00 5654-99 P co CCGG 135.940 -999.990 ... V2 2018 02 07 13 48 00 78.9067 11.8883 479.00 474.00 5.00 437703 ZEP 2018 01 04 10 45 00 5621-99 P co CCGG 132.280 -999.990 ... V2 2018 02 08 09 20 00 78.9067 11.8883 479.00 474.00 5.00 437918 ZEP 2018 01 04 10 45 00 5622-99 P co CCGG 132.330 -999.990 ... V2 2018 02 08 09 36 00 78.9067 11.8883 479.00 474.00 5.00 437919 ZEP 2018 01 11 08 37 00 3551-99 P co CCGG 124.910 -999.990 ... V2 2018 02 13 09 03 00 78.9067 11.8883 479.00 474.00 5.00 438223 ZEP 2018 01 11 08 37 00 3552-99 P co CCGG 113.410 -999.990 A.. V2 2018 02 13 09 19 00 78.9067 11.8883 479.00 474.00 5.00 438224 ZEP 2018 01 18 09 12 00 4855-99 P co CCGG 124.060 -999.990 ... V2 2018 02 20 13 46 00 78.9067 11.8883 479.00 474.00 5.00 438219 ZEP 2018 01 18 09 12 00 4856-99 P co CCGG 124.140 -999.990 ... V2 2018 02 20 14 02 00 78.9067 11.8883 479.00 474.00 5.00 438220 ZEP 2018 01 25 08 16 00 1667-99 P co CCGG 137.210 -999.990 ... V2 2018 03 01 10 32 00 78.9067 11.8883 479.00 474.00 5.00 438950 ZEP 2018 01 25 08 16 00 1668-99 P co CCGG 136.990 -999.990 ... V2 2018 03 01 10 48 00 78.9067 11.8883 479.00 474.00 5.00 438951 ZEP 2018 02 01 08 50 00 2669-99 P co CCGG 133.510 -999.990 ... V2 2018 03 01 10 00 00 78.9067 11.8883 479.00 474.00 5.00 438952 ZEP 2018 02 01 08 50 00 2670-99 P co CCGG 133.930 -999.990 ... V2 2018 03 01 10 16 00 78.9067 11.8883 479.00 474.00 5.00 438953 ZEP 2018 02 15 08 45 00 1641-99 P co CCGG 140.220 -999.990 ... V2 2018 03 16 10 50 00 78.9067 11.8883 479.00 474.00 5.00 440094 ZEP 2018 02 15 08 45 00 260-99 P co CCGG 138.350 -999.990 ... V2 2018 03 16 11 06 00 78.9067 11.8883 479.00 474.00 5.00 440095 ZEP 2018 02 22 08 37 00 2355-99 P co CCGG 146.270 -999.990 ... V2 2018 03 16 10 18 00 78.9067 11.8883 479.00 474.00 5.00 440092 ZEP 2018 02 22 08 37 00 2356-99 P co CCGG 146.410 -999.990 ... V2 2018 03 16 10 34 00 78.9067 11.8883 479.00 474.00 5.00 440093 ZEP 2018 03 01 08 33 00 3819-99 P co CCGG 143.350 -999.990 ... V2 2018 04 13 12 37 00 78.9067 11.8883 479.00 474.00 5.00 441383 ZEP 2018 03 01 08 33 00 3820-99 P co CCGG 143.380 -999.990 ... V2 2018 04 13 12 53 00 78.9067 11.8883 479.00 474.00 5.00 441384 ZEP 2018 03 08 10 15 00 261-99 P co CCGG 140.290 -999.990 ... V2 2018 04 16 14 59 00 78.9067 11.8883 479.00 474.00 5.00 441387 ZEP 2018 03 08 10 15 00 262-99 P co CCGG 140.630 -999.990 ... V2 2018 04 16 15 15 00 78.9067 11.8883 479.00 474.00 5.00 441388 ZEP 2018 03 15 08 47 00 1527-99 P co CCGG 142.920 -999.990 ... V2 2018 04 13 13 09 00 78.9067 11.8883 479.00 474.00 5.00 441381 ZEP 2018 03 15 08 47 00 1528-99 P co CCGG 143.230 -999.990 ... V2 2018 04 13 13 25 00 78.9067 11.8883 479.00 474.00 5.00 441382 ZEP 2018 03 22 07 00 00 1349-99 P co CCGG 139.930 -999.990 ... V2 2018 04 24 11 13 00 78.9067 11.8883 479.00 474.00 5.00 441960 ZEP 2018 03 22 07 00 00 1350-99 P co CCGG 140.010 -999.990 ... V2 2018 04 24 11 29 00 78.9067 11.8883 479.00 474.00 5.00 441961 ZEP 2018 03 29 07 20 00 199-99 P co CCGG 145.530 -999.990 ... V2 2018 04 24 10 41 00 78.9067 11.8883 479.00 474.00 5.00 441958 ZEP 2018 03 29 07 20 00 200-99 P co CCGG 144.990 -999.990 ... V2 2018 04 24 10 57 00 78.9067 11.8883 479.00 474.00 5.00 441959 ZEP 2018 04 05 07 52 00 1943-99 P co CCGG 153.830 -999.990 ... V2 2018 05 09 13 53 00 78.9067 11.8883 479.00 474.00 5.00 442884 ZEP 2018 04 05 07 52 00 1944-99 P co CCGG 153.880 -999.990 ... V2 2018 05 09 14 08 00 78.9067 11.8883 479.00 474.00 5.00 442885 ZEP 2018 04 12 07 55 00 5469-99 P co CCGG 140.780 -999.990 ... V2 2018 05 09 13 21 00 78.9067 11.8883 479.00 474.00 5.00 442882 ZEP 2018 04 12 07 55 00 5470-99 P co CCGG 141.710 -999.990 ... V2 2018 05 09 13 37 00 78.9067 11.8883 479.00 474.00 5.00 442883 ZEP 2018 04 19 12 25 00 4853-99 P co CCGG 141.230 -999.990 ... V2 2018 05 25 12 12 00 78.9067 11.8883 479.00 474.00 5.00 444043 ZEP 2018 04 19 12 25 00 4942-99 P co CCGG 141.740 -999.990 ... V2 2018 05 25 12 28 00 78.9067 11.8883 479.00 474.00 5.00 444044 ZEP 2018 04 26 09 29 00 4364-99 P co CCGG 140.630 -999.990 ... V2 2018 05 25 11 56 00 78.9067 11.8883 479.00 474.00 5.00 444041 ZEP 2018 04 26 09 29 00 5317-99 P co CCGG 140.800 -999.990 ... V2 2018 05 25 11 40 00 78.9067 11.8883 479.00 474.00 5.00 444042 ZEP 2018 05 03 08 03 00 5369-99 P co CCGG 131.060 -999.990 ... V2 2018 07 09 11 30 00 78.9067 11.8883 479.00 474.00 5.00 446061 ZEP 2018 05 03 08 03 00 5370-99 P co CCGG 130.480 -999.990 ... V2 2018 07 09 11 46 00 78.9067 11.8883 479.00 474.00 5.00 446062 ZEP 2018 05 10 07 10 00 159-99 P co CCGG 127.710 -999.990 ... V2 2018 07 09 10 59 00 78.9067 11.8883 479.00 474.00 5.00 446059 ZEP 2018 05 10 07 10 00 160-99 P co CCGG 127.820 -999.990 ... V2 2018 07 09 11 15 00 78.9067 11.8883 479.00 474.00 5.00 446060 ZEP 2018 05 17 07 33 00 5641-99 P co CCGG 119.520 -999.990 ... V2 2018 06 25 14 40 00 78.9067 11.8883 479.00 474.00 5.00 445506 ZEP 2018 05 17 07 33 00 5642-99 P co CCGG 118.390 -999.990 ... V2 2018 06 25 14 56 00 78.9067 11.8883 479.00 474.00 5.00 445507 ZEP 2018 05 24 07 22 00 4089-99 P co CCGG 115.570 -999.990 ... V2 2018 06 25 15 12 00 78.9067 11.8883 479.00 474.00 5.00 445504 ZEP 2018 05 24 07 22 00 4090-99 P co CCGG 116.340 -999.990 ... V2 2018 06 25 15 28 00 78.9067 11.8883 479.00 474.00 5.00 445505 ZEP 2018 05 31 06 35 00 2093-99 P co CCGG 109.210 -999.990 ... V2 2018 07 09 15 13 00 78.9067 11.8883 479.00 474.00 5.00 446057 ZEP 2018 05 31 06 35 00 2094-99 P co CCGG 109.520 -999.990 ... V2 2018 07 09 15 29 00 78.9067 11.8883 479.00 474.00 5.00 446058 ZEP 2018 06 07 08 25 00 1083-99 P co CCGG 105.710 -999.990 ... V2 2018 07 09 15 45 00 78.9067 11.8883 479.00 474.00 5.00 446055 ZEP 2018 06 07 08 25 00 1084-99 P co CCGG 106.230 -999.990 ... V2 2018 07 09 16 01 00 78.9067 11.8883 479.00 474.00 5.00 446056 ZEP 2018 06 14 07 53 00 5563-99 P co CCGG 97.800 -999.990 ... V2 2018 07 18 14 41 00 78.9067 11.8883 479.00 474.00 5.00 446463 ZEP 2018 06 14 07 53 00 5564-99 P co CCGG 95.440 -999.990 ... V2 2018 07 18 14 57 00 78.9067 11.8883 479.00 474.00 5.00 446464 ZEP 2018 06 21 12 30 00 1677-99 P co CCGG 91.340 -999.990 ... V2 2018 07 18 14 09 00 78.9067 11.8883 479.00 474.00 5.00 446461 ZEP 2018 06 21 12 30 00 1678-99 P co CCGG 91.530 -999.990 ... V2 2018 07 18 14 25 00 78.9067 11.8883 479.00 474.00 5.00 446462 ZEP 2018 06 28 07 55 00 2225-99 P co CCGG 87.050 -999.990 ... V2 2018 08 07 10 05 00 78.9067 11.8883 479.00 474.00 5.00 447048 ZEP 2018 06 28 07 55 00 2226-99 P co CCGG 88.270 -999.990 ... V2 2018 08 07 10 20 00 78.9067 11.8883 479.00 474.00 5.00 447049 ZEP 2018 07 05 08 12 00 3885-99 P co CCGG 83.840 -999.990 ... V2 2018 08 07 09 33 00 78.9067 11.8883 479.00 474.00 5.00 447046 ZEP 2018 07 05 08 12 00 3886-99 P co CCGG 83.760 -999.990 ... V2 2018 08 07 09 49 00 78.9067 11.8883 479.00 474.00 5.00 447047 ZEP 2018 07 12 07 38 00 5773-99 P co CCGG 79.530 -999.990 ... V2 2018 08 20 16 42 00 78.9067 11.8883 479.00 474.00 5.00 447587 ZEP 2018 07 12 07 38 00 5774-99 P co CCGG 78.710 -999.990 ... V2 2018 08 20 16 58 00 78.9067 11.8883 479.00 474.00 5.00 447588 ZEP 2018 07 19 08 40 00 3261-99 P co CCGG 85.940 -999.990 ... V2 2018 08 21 10 01 00 78.9067 11.8883 479.00 474.00 5.00 447585 ZEP 2018 07 19 08 40 00 3262-99 P co CCGG 85.990 -999.990 ... V2 2018 08 21 10 17 00 78.9067 11.8883 479.00 474.00 5.00 447586 ZEP 2018 07 26 07 22 00 2141-99 P co CCGG 79.630 -999.990 ... V2 2018 09 07 09 51 00 78.9067 11.8883 479.00 474.00 5.00 448563 ZEP 2018 07 26 07 22 00 276-99 P co CCGG 79.590 -999.990 ... V2 2018 09 07 10 06 00 78.9067 11.8883 479.00 474.00 5.00 448564 ZEP 2018 08 02 07 26 00 2142-99 P co CCGG 96.260 -999.990 ... V2 2018 09 07 09 35 00 78.9067 11.8883 479.00 474.00 5.00 448562 ZEP 2018 08 02 07 26 00 275-99 P co CCGG 96.310 -999.990 ... V2 2018 09 07 09 19 00 78.9067 11.8883 479.00 474.00 5.00 448561 ZEP 2018 08 09 16 04 00 5715-99 P co CCGG 86.630 -999.990 ... V2 2018 09 10 11 49 00 78.9067 11.8883 479.00 474.00 5.00 448769 ZEP 2018 08 09 16 04 00 5716-99 P co CCGG 86.560 -999.990 ... V2 2018 09 10 12 05 00 78.9067 11.8883 479.00 474.00 5.00 448770 ZEP 2018 08 16 07 58 00 4549-99 P co CCGG 87.130 -999.990 ... V2 2018 09 10 11 18 00 78.9067 11.8883 479.00 474.00 5.00 448767 ZEP 2018 08 16 07 58 00 4550-99 P co CCGG 87.610 -999.990 ... V2 2018 09 10 11 33 00 78.9067 11.8883 479.00 474.00 5.00 448768 ZEP 2018 08 23 07 47 00 791-99 P co CCGG 108.560 -999.990 ... V2 2018 09 18 12 15 00 78.9067 11.8883 479.00 474.00 5.00 449060 ZEP 2018 08 23 07 47 00 792-99 P co CCGG 108.070 -999.990 ... V2 2018 09 18 12 31 00 78.9067 11.8883 479.00 474.00 5.00 449061 ZEP 2018 08 30 07 34 00 2273-99 P co CCGG 108.390 -999.990 ... V2 2018 09 18 12 47 00 78.9067 11.8883 479.00 474.00 5.00 449058 ZEP 2018 08 30 07 34 00 2274-99 P co CCGG 108.130 -999.990 ... V2 2018 09 18 13 03 00 78.9067 11.8883 479.00 474.00 5.00 449059 ZEP 2018 09 06 07 15 00 3401-99 P co CCGG 100.210 -999.990 ... V2 2018 10 02 10 31 00 78.9067 11.8883 479.00 474.00 5.00 449700 ZEP 2018 09 06 07 15 00 3402-99 P co CCGG 102.260 -999.990 ... V2 2018 10 02 10 47 00 78.9067 11.8883 479.00 474.00 5.00 449701 ZEP 2018 09 13 07 12 00 3125-99 P co CCGG 118.350 -999.990 ... V2 2018 10 02 11 03 00 78.9067 11.8883 479.00 474.00 5.00 449698 ZEP 2018 09 13 07 12 00 3126-99 P co CCGG 118.320 -999.990 ... V2 2018 10 02 11 18 00 78.9067 11.8883 479.00 474.00 5.00 449699 ZEP 2018 09 20 07 10 00 987-99 P co CCGG 115.200 -999.990 ... V2 2018 10 19 12 44 00 78.9067 11.8883 479.00 474.00 5.00 450379 ZEP 2018 09 20 07 10 00 988-99 P co CCGG 116.180 -999.990 ... V2 2018 10 19 12 59 00 78.9067 11.8883 479.00 474.00 5.00 450380 ZEP 2018 09 27 07 30 00 1947-99 P co CCGG 115.090 -999.990 ... V2 2018 10 19 12 12 00 78.9067 11.8883 479.00 474.00 5.00 450381 ZEP 2018 09 27 07 30 00 1948-99 P co CCGG 115.400 -999.990 ... V2 2018 10 19 12 28 00 78.9067 11.8883 479.00 474.00 5.00 450382 ZEP 2018 10 04 07 32 00 1609-99 P co CCGG 114.510 -999.990 ... V2 2018 11 06 15 02 00 78.9067 11.8883 479.00 474.00 5.00 451105 ZEP 2018 10 04 07 32 00 1610-99 P co CCGG 113.820 -999.990 ... V2 2018 11 06 15 18 00 78.9067 11.8883 479.00 474.00 5.00 451106 ZEP 2018 10 11 07 50 00 2289-99 P co CCGG 111.820 -999.990 ... V2 2018 11 06 13 27 00 78.9067 11.8883 479.00 474.00 5.00 451103 ZEP 2018 10 11 07 50 00 2290-99 P co CCGG 112.260 -999.990 ... V2 2018 11 06 13 43 00 78.9067 11.8883 479.00 474.00 5.00 451104 ZEP 2018 10 18 07 25 00 2949-99 P co CCGG 111.920 -999.990 ... V2 2018 11 20 16 09 00 78.9067 11.8883 479.00 474.00 5.00 451558 ZEP 2018 10 18 07 25 00 2950-99 P co CCGG 111.950 -999.990 ... V2 2018 11 20 16 25 00 78.9067 11.8883 479.00 474.00 5.00 451559 ZEP 2018 10 25 07 11 00 5693-99 P co CCGG 110.370 -999.990 ... V2 2018 11 21 08 45 00 78.9067 11.8883 479.00 474.00 5.00 451560 ZEP 2018 10 25 07 11 00 5694-99 P co CCGG 110.600 -999.990 ... V2 2018 11 21 09 00 00 78.9067 11.8883 479.00 474.00 5.00 451561 ZEP 2018 11 01 09 42 00 4523-99 P co CCGG 108.470 -999.990 ... V2 2018 11 29 10 08 00 78.9067 11.8883 479.00 474.00 5.00 451854 ZEP 2018 11 01 09 42 00 4524-99 P co CCGG 107.960 -999.990 ... V2 2018 11 29 10 24 00 78.9067 11.8883 479.00 474.00 5.00 451853 ZEP 2018 11 08 09 30 00 3105-99 P co CCGG 112.380 -999.990 ... V2 2018 11 29 09 37 00 78.9067 11.8883 479.00 474.00 5.00 451851 ZEP 2018 11 08 09 30 00 3106-99 P co CCGG 112.300 -999.990 ... V2 2018 11 29 09 52 00 78.9067 11.8883 479.00 474.00 5.00 451852 ZEP 2018 11 15 08 28 00 1943-99 P co CCGG 112.060 -999.990 ... V2 2019 01 16 12 14 00 78.9067 11.8883 479.00 474.00 5.00 453029 ZEP 2018 11 15 08 28 00 1944-99 P co CCGG 111.700 -999.990 ... V2 2019 01 16 12 30 00 78.9067 11.8883 479.00 474.00 5.00 453030 ZEP 2018 11 22 08 47 00 5617-99 P co CCGG 114.070 -999.990 ... V2 2019 01 16 09 35 00 78.9067 11.8883 479.00 474.00 5.00 453021 ZEP 2018 11 22 08 47 00 5618-99 P co CCGG 114.420 -999.990 ... V2 2019 01 16 09 51 00 78.9067 11.8883 479.00 474.00 5.00 453022 ZEP 2018 11 29 12 48 00 5075-99 P co CCGG 121.270 -999.990 ... V2 2019 01 18 15 48 00 78.9067 11.8883 479.00 474.00 5.00 453317 ZEP 2018 11 29 12 48 00 5076-99 P co CCGG 121.200 -999.990 ... V2 2019 01 18 16 04 00 78.9067 11.8883 479.00 474.00 5.00 453318 ZEP 2018 12 06 12 42 00 3471-99 P co CCGG 124.630 -999.990 ... V2 2019 01 18 16 20 00 78.9067 11.8883 479.00 474.00 5.00 453315 ZEP 2018 12 06 12 42 00 3472-99 P co CCGG 123.600 -999.990 ... V2 2019 01 18 16 35 00 78.9067 11.8883 479.00 474.00 5.00 453316 ZEP 2018 12 13 08 20 00 5691-99 P co CCGG 111.160 -999.990 ... V2 2019 01 17 15 36 00 78.9067 11.8883 479.00 474.00 5.00 453349 ZEP 2018 12 13 08 20 00 5692-99 P co CCGG 110.180 -999.990 ... V2 2019 01 17 15 51 00 78.9067 11.8883 479.00 474.00 5.00 453350 ZEP 2018 12 20 12 34 56 2217-99 P co CCGG 126.520 -999.990 ... V2 2019 01 17 15 04 00 78.9067 11.8883 479.00 474.00 5.00 453347 ZEP 2018 12 20 12 34 56 2218-99 P co CCGG 126.960 -999.990 ... V2 2019 01 17 15 20 00 78.9067 11.8883 479.00 474.00 5.00 453348 ZEP 2018 12 27 08 10 00 5527-99 P co CCGG 125.100 -999.990 ... V2 2019 02 05 15 03 00 78.9067 11.8883 479.00 474.00 5.00 453622 ZEP 2018 12 27 08 10 00 5528-99 P co CCGG 124.340 -999.990 ... V2 2019 02 05 15 19 00 78.9067 11.8883 479.00 474.00 5.00 453623 ZEP 2019 01 03 12 45 00 17-99 P co CCGG 130.720 -999.990 ... V2 2019 02 05 15 35 00 78.9067 11.8883 479.00 474.00 5.00 453620 ZEP 2019 01 03 12 45 00 18-99 P co CCGG 130.020 -999.990 ... V2 2019 02 05 15 50 00 78.9067 11.8883 479.00 474.00 5.00 453621 ZEP 2019 01 11 09 12 00 453-99 P co CCGG 133.770 -999.990 ... V2 2019 03 07 12 52 00 78.9067 11.8883 479.00 474.00 5.00 455153 ZEP 2019 01 11 09 12 00 454-99 P co CCGG 135.080 -999.990 ... V2 2019 03 07 13 08 00 78.9067 11.8883 479.00 474.00 5.00 455154 ZEP 2019 01 17 08 09 00 3783-99 P co CCGG 156.220 -999.990 .X. V2 2019 03 07 12 20 00 78.9067 11.8883 479.00 474.00 5.00 455151 ZEP 2019 01 17 08 09 00 3784-99 P co CCGG 156.710 -999.990 .X. V2 2019 03 07 12 36 00 78.9067 11.8883 479.00 474.00 5.00 455152 ZEP 2019 01 24 08 17 00 4117-99 P co CCGG 145.170 -999.990 ... V2 2019 03 07 11 17 00 78.9067 11.8883 479.00 474.00 5.00 455149 ZEP 2019 01 24 08 17 00 4118-99 P co CCGG 144.740 -999.990 ... V2 2019 03 07 11 33 00 78.9067 11.8883 479.00 474.00 5.00 455150 ZEP 2019 01 31 08 09 00 2039-99 P co CCGG 169.390 -999.990 .X. V2 2019 03 07 11 49 00 78.9067 11.8883 479.00 474.00 5.00 455147 ZEP 2019 01 31 08 09 00 2040-99 P co CCGG 168.740 -999.990 .X. V2 2019 03 07 12 05 00 78.9067 11.8883 479.00 474.00 5.00 455148 ZEP 2019 02 07 10 48 00 2633-99 P co CCGG 146.510 -999.990 ... V2 2019 03 14 13 22 00 78.9067 11.8883 479.00 474.00 5.00 455617 ZEP 2019 02 07 10 48 00 2634-99 P co CCGG 146.350 -999.990 ... V2 2019 03 14 13 38 00 78.9067 11.8883 479.00 474.00 5.00 455618 ZEP 2019 02 14 08 20 00 5659-99 P co CCGG 127.940 -999.990 ... V2 2019 03 14 14 25 00 78.9067 11.8883 479.00 474.00 5.00 455615 ZEP 2019 02 14 08 20 00 5660-99 P co CCGG 127.900 -999.990 ... V2 2019 03 14 14 41 00 78.9067 11.8883 479.00 474.00 5.00 455616 ZEP 2019 02 21 08 24 00 1259-99 P co CCGG 138.810 -999.990 ... V2 2019 03 21 09 34 00 78.9067 11.8883 479.00 474.00 5.00 455900 ZEP 2019 02 21 08 24 00 1260-99 P co CCGG 138.750 -999.990 ... V2 2019 03 21 09 50 00 78.9067 11.8883 479.00 474.00 5.00 455901 ZEP 2019 02 28 08 45 00 5533-99 P co CCGG 143.510 -999.990 ... V2 2019 03 20 16 28 00 78.9067 11.8883 479.00 474.00 5.00 455898 ZEP 2019 02 28 08 45 00 5534-99 P co CCGG 143.930 -999.990 ... V2 2019 03 20 16 44 00 78.9067 11.8883 479.00 474.00 5.00 455899 ZEP 2019 03 07 07 33 00 469-99 P co CCGG 142.070 -999.990 ... V2 2019 04 11 17 27 00 78.9067 11.8883 479.00 474.00 5.00 456725 ZEP 2019 03 07 07 33 00 964-99 P co CCGG 141.150 -999.990 ... V2 2019 04 11 17 43 00 78.9067 11.8883 479.00 474.00 5.00 456726 ZEP 2019 03 14 08 32 00 5529-99 P co CCGG 143.030 -999.990 ... V2 2019 04 11 17 59 00 78.9067 11.8883 479.00 474.00 5.00 456723 ZEP 2019 03 14 08 32 00 5599-99 P co CCGG 143.710 -999.990 ... V2 2019 04 11 18 15 00 78.9067 11.8883 479.00 474.00 5.00 456724 ZEP 2019 03 21 09 45 00 5725-99 P co CCGG 135.670 -999.990 ... V2 2019 04 25 15 15 00 78.9067 11.8883 479.00 474.00 5.00 457232 ZEP 2019 03 21 09 45 00 5726-99 P co CCGG 136.780 -999.990 ... V2 2019 04 25 15 31 00 78.9067 11.8883 479.00 474.00 5.00 457233 ZEP 2019 03 28 08 45 00 3931-99 P co CCGG 140.010 -999.990 ... V2 2019 04 25 14 43 00 78.9067 11.8883 479.00 474.00 5.00 457234 ZEP 2019 03 28 08 45 00 3932-99 P co CCGG 139.760 -999.990 ... V2 2019 04 25 14 59 00 78.9067 11.8883 479.00 474.00 5.00 457235 ZEP 2019 04 04 07 35 00 2351-99 P co CCGG 148.170 -999.990 ... V2 2019 05 22 12 25 00 78.9067 11.8883 479.00 474.00 5.00 458687 ZEP 2019 04 04 07 35 00 2352-99 P co CCGG 147.620 -999.990 ... V2 2019 05 22 12 41 00 78.9067 11.8883 479.00 474.00 5.00 458688 ZEP 2019 04 11 07 39 00 3065-99 P co CCGG 134.200 -999.990 ... V2 2019 05 22 11 53 00 78.9067 11.8883 479.00 474.00 5.00 458685 ZEP 2019 04 11 07 39 00 3066-99 P co CCGG 133.820 -999.990 ... V2 2019 05 22 12 08 00 78.9067 11.8883 479.00 474.00 5.00 458686 ZEP 2019 04 18 09 46 00 4649-99 P co CCGG 144.160 -999.990 ... V2 2019 05 21 14 23 00 78.9067 11.8883 479.00 474.00 5.00 458679 ZEP 2019 04 18 09 46 00 4650-99 P co CCGG 144.140 -999.990 ... V2 2019 05 21 14 39 00 78.9067 11.8883 479.00 474.00 5.00 458680 ZEP 2019 04 25 07 45 00 2375-99 P co CCGG 129.050 -999.990 ... V2 2019 05 21 13 51 00 78.9067 11.8883 479.00 474.00 5.00 458681 ZEP 2019 04 25 07 45 00 2376-99 P co CCGG 129.430 -999.990 ... V2 2019 05 21 14 07 00 78.9067 11.8883 479.00 474.00 5.00 458682 ZEP 2019 05 02 08 33 00 2225-99 P co CCGG 133.160 -999.990 ... V2 2019 06 17 11 30 00 78.9067 11.8883 479.00 474.00 5.00 459427 ZEP 2019 05 02 08 33 00 2226-99 P co CCGG 133.480 -999.990 ... V2 2019 06 17 11 46 00 78.9067 11.8883 479.00 474.00 5.00 459428 ZEP 2019 05 09 07 27 00 475-99 P co CCGG 128.280 -999.990 ... V2 2019 06 17 10 58 00 78.9067 11.8883 479.00 474.00 5.00 459425 ZEP 2019 05 09 07 27 00 476-99 P co CCGG 128.010 -999.990 ... V2 2019 06 17 11 14 00 78.9067 11.8883 479.00 474.00 5.00 459426 ZEP 2019 05 16 08 12 00 2051-99 P co CCGG 120.300 -999.990 ... V2 2019 07 08 17 03 00 78.9067 11.8883 479.00 474.00 5.00 460608 ZEP 2019 05 16 08 12 00 2052-99 P co CCGG 120.070 -999.990 ... V2 2019 07 08 17 19 00 78.9067 11.8883 479.00 474.00 5.00 460609 ZEP 2019 05 23 07 40 00 5603-99 P co CCGG 110.190 -999.990 ... V2 2019 07 09 09 33 00 78.9067 11.8883 479.00 474.00 5.00 460614 ZEP 2019 05 23 07 40 00 5604-99 P co CCGG 110.320 -999.990 ... V2 2019 07 09 09 17 00 78.9067 11.8883 479.00 474.00 5.00 460615 ZEP 2019 05 30 08 30 00 3529-99 P co CCGG 104.550 -999.990 ... V2 2019 07 03 10 54 00 78.9067 11.8883 479.00 474.00 5.00 460530 ZEP 2019 05 30 08 30 00 3530-99 P co CCGG 104.270 -999.990 ... V2 2019 07 03 11 10 00 78.9067 11.8883 479.00 474.00 5.00 460531 ZEP 2019 06 06 07 11 00 5379-99 P co CCGG 99.370 -999.990 ... V2 2019 07 03 11 25 00 78.9067 11.8883 479.00 474.00 5.00 460528 ZEP 2019 06 06 07 11 00 5380-99 P co CCGG 99.330 -999.990 ... V2 2019 07 03 11 41 00 78.9067 11.8883 479.00 474.00 5.00 460529 ZEP 2019 06 13 07 01 00 3885-99 P co CCGG 94.550 -999.990 ... V2 2019 07 25 10 49 00 78.9067 11.8883 479.00 474.00 5.00 461598 ZEP 2019 06 13 07 01 00 3886-99 P co CCGG 92.960 -999.990 ... V2 2019 07 25 11 05 00 78.9067 11.8883 479.00 474.00 5.00 461599 ZEP 2019 06 20 08 29 00 3963-99 P co CCGG 90.120 -999.990 ... V2 2019 07 25 11 21 00 78.9067 11.8883 479.00 474.00 5.00 461597 ZEP 2019 06 20 08 29 00 3964-99 P co CCGG 89.910 -999.990 ... V2 2019 07 25 11 37 00 78.9067 11.8883 479.00 474.00 5.00 461596 ZEP 2019 06 27 07 12 00 3493-99 P co CCGG 85.650 -999.990 ... V2 2019 08 05 16 35 00 78.9067 11.8883 479.00 474.00 5.00 462053 ZEP 2019 06 27 07 12 00 3494-99 P co CCGG 85.210 -999.990 ... V2 2019 08 05 16 51 00 78.9067 11.8883 479.00 474.00 5.00 462054 ZEP 2019 07 04 08 17 00 4933-99 P co CCGG 87.220 -999.990 ... V2 2019 08 05 17 06 00 78.9067 11.8883 479.00 474.00 5.00 462055 ZEP 2019 07 04 08 17 00 4934-99 P co CCGG 87.670 -999.990 ... V2 2019 08 05 17 22 00 78.9067 11.8883 479.00 474.00 5.00 462056 ZEP 2019 07 11 07 59 00 3895-99 P co CCGG 89.870 -999.990 ... AR2 2019 08 26 11 17 03 78.9067 11.8883 479.00 474.00 5.00 463668 ZEP 2019 07 11 07 59 00 5589-99 P co CCGG 89.760 -999.990 ... AR2 2019 08 26 11 31 21 78.9067 11.8883 479.00 474.00 5.00 463669 ZEP 2019 07 18 07 19 00 3353-99 P co CCGG 78.160 -999.990 ... AR2 2019 08 26 12 00 02 78.9067 11.8883 479.00 474.00 5.00 463667 ZEP 2019 07 18 07 19 00 4883-99 P co CCGG 78.180 -999.990 ... AR2 2019 08 26 11 45 39 78.9067 11.8883 479.00 474.00 5.00 463666 ZEP 2019 07 25 07 27 00 3299-99 P co CCGG 78.460 -999.990 ... AR2 2019 08 23 12 41 37 78.9067 11.8883 479.00 474.00 5.00 463609 ZEP 2019 07 25 07 27 00 3570-99 P co CCGG 78.340 -999.990 ... AR2 2019 08 23 12 55 53 78.9067 11.8883 479.00 474.00 5.00 463610 ZEP 2019 08 01 07 34 00 3300-99 P co CCGG 90.460 -999.990 ... AR2 2019 08 23 13 24 24 78.9067 11.8883 479.00 474.00 5.00 463608 ZEP 2019 08 01 07 34 00 3569-99 P co CCGG 90.730 -999.990 ... AR2 2019 08 23 13 10 09 78.9067 11.8883 479.00 474.00 5.00 463607 ZEP 2019 08 08 08 21 00 3831-99 P co CCGG 95.220 -999.990 ... AR2 2019 09 06 15 01 39 78.9067 11.8883 479.00 474.00 5.00 464201 ZEP 2019 08 08 08 21 00 3832-99 P co CCGG 95.170 -999.990 ... AR2 2019 09 06 15 15 56 78.9067 11.8883 479.00 474.00 5.00 464202 ZEP 2019 08 15 07 40 00 4815-99 P co CCGG 102.180 -999.990 ... AR2 2019 09 06 14 33 08 78.9067 11.8883 479.00 474.00 5.00 464199 ZEP 2019 08 15 07 40 00 4816-99 P co CCGG 102.490 -999.990 ... AR2 2019 09 06 14 47 23 78.9067 11.8883 479.00 474.00 5.00 464200 ZEP 2019 08 22 07 45 00 3013-99 P co CCGG 109.040 -999.990 ... AR2 2019 10 11 15 09 14 78.9067 11.8883 479.00 474.00 5.00 465789 ZEP 2019 08 22 07 45 00 3014-99 P co CCGG 109.070 -999.990 ... AR2 2019 10 11 15 23 36 78.9067 11.8883 479.00 474.00 5.00 465790 ZEP 2019 08 29 07 56 00 603-99 P co CCGG 120.910 -999.990 ... AR2 2019 10 11 15 37 58 78.9067 11.8883 479.00 474.00 5.00 465787 ZEP 2019 08 29 07 56 00 604-99 P co CCGG 121.140 -999.990 ... AR2 2019 10 11 15 52 18 78.9067 11.8883 479.00 474.00 5.00 465788 ZEP 2019 09 05 07 29 00 5155-99 P co CCGG 123.230 -999.990 ... AR2 2019 10 07 15 28 13 78.9067 11.8883 479.00 474.00 5.00 465771 ZEP 2019 09 05 07 29 00 5156-99 P co CCGG 122.970 -999.990 ... AR2 2019 10 07 15 42 36 78.9067 11.8883 479.00 474.00 5.00 465772 ZEP 2019 09 13 07 52 00 1149-99 P co CCGG 89.190 -999.990 N.. AR2 2019 10 07 15 56 56 78.9067 11.8883 479.00 474.00 5.00 465773 ZEP 2019 09 13 07 52 00 1150-99 P co CCGG 6.060 -999.990 N.. AR2 2019 10 07 16 11 16 78.9067 11.8883 479.00 474.00 5.00 465774 ZEP 2019 09 13 08 05 00 3033-99 P co CCGG 136.480 -999.990 .X. AR2 2019 11 08 15 09 33 78.9067 11.8883 479.00 474.00 5.00 466735 ZEP 2019 09 13 08 05 00 3034-99 P co CCGG 135.790 -999.990 .X. AR2 2019 11 08 15 23 53 78.9067 11.8883 479.00 474.00 5.00 466736 ZEP 2019 09 19 08 02 00 3955-99 P co CCGG 126.450 -999.990 ... AR2 2019 11 08 15 38 13 78.9067 11.8883 479.00 474.00 5.00 466733 ZEP 2019 09 19 08 02 00 3956-99 P co CCGG 127.250 -999.990 ... AR2 2019 11 08 15 52 33 78.9067 11.8883 479.00 474.00 5.00 466734 ZEP 2019 09 26 08 16 00 3931-99 P co CCGG 113.030 -999.990 ... AR2 2019 11 12 11 41 00 78.9067 11.8883 479.00 474.00 5.00 466731 ZEP 2019 09 26 08 16 00 3932-99 P co CCGG 112.750 -999.990 ... AR2 2019 11 12 11 55 18 78.9067 11.8883 479.00 474.00 5.00 466732 ZEP 2019 10 03 07 47 00 3487-99 P co CCGG 119.000 -999.990 ... AR2 2019 11 12 12 09 35 78.9067 11.8883 479.00 474.00 5.00 466729 ZEP 2019 10 03 07 47 00 3488-99 P co CCGG 118.800 -999.990 ... AR2 2019 11 12 12 23 53 78.9067 11.8883 479.00 474.00 5.00 466730 ZEP 2019 10 10 07 50 00 5379-99 P co CCGG 108.750 -999.990 ... AR2 2019 11 15 14 58 45 78.9067 11.8883 479.00 474.00 5.00 467012 ZEP 2019 10 10 07 50 00 5380-99 P co CCGG 108.640 -999.990 ... AR2 2019 11 15 15 13 02 78.9067 11.8883 479.00 474.00 5.00 467013 ZEP 2019 10 17 07 45 00 1057-99 P co CCGG 107.700 -999.990 ... AR2 2019 11 15 15 27 20 78.9067 11.8883 479.00 474.00 5.00 467014 ZEP 2019 10 17 07 45 00 1058-99 P co CCGG 107.700 -999.990 ... AR2 2019 11 15 15 41 38 78.9067 11.8883 479.00 474.00 5.00 467015 ZEP 2019 10 24 07 29 00 1823-99 P co CCGG 111.450 -999.990 ... AR2 2019 12 04 16 07 44 78.9067 11.8883 479.00 474.00 5.00 467796 ZEP 2019 10 24 07 29 00 1824-99 P co CCGG 112.000 -999.990 ... AR2 2019 12 04 16 22 06 78.9067 11.8883 479.00 474.00 5.00 467797 ZEP 2019 10 31 08 47 00 3677-99 P co CCGG 113.690 -999.990 ... AR2 2019 12 04 15 39 04 78.9067 11.8883 479.00 474.00 5.00 467798 ZEP 2019 10 31 08 47 00 3678-99 P co CCGG 113.850 -999.990 ... AR2 2019 12 04 15 53 26 78.9067 11.8883 479.00 474.00 5.00 467799 ZEP 2019 11 07 08 21 00 2041-99 P co CCGG 114.690 -999.990 ... AR2 2019 12 19 11 21 29 78.9067 11.8883 479.00 474.00 5.00 468112 ZEP 2019 11 07 08 21 00 2042-99 P co CCGG 114.220 -999.990 ... AR2 2019 12 19 11 35 46 78.9067 11.8883 479.00 474.00 5.00 468113 ZEP 2019 11 14 09 37 00 4649-99 P co CCGG 120.250 -999.990 ... AR2 2019 12 19 10 52 51 78.9067 11.8883 479.00 474.00 5.00 468110 ZEP 2019 11 14 09 37 00 4650-99 P co CCGG 120.240 -999.990 ... AR2 2019 12 19 11 07 08 78.9067 11.8883 479.00 474.00 5.00 468111 ZEP 2019 11 21 08 39 00 367-99 P co CCGG 115.960 -999.990 ... AR2 2020 01 22 15 11 21 78.9067 11.8883 479.00 474.00 5.00 468808 ZEP 2019 11 21 08 39 00 368-99 P co CCGG 115.960 -999.990 ... AR2 2020 01 22 15 25 41 78.9067 11.8883 479.00 474.00 5.00 468809 ZEP 2019 11 28 08 24 00 3679-99 P co CCGG 111.760 -999.990 ... AR2 2020 01 22 15 40 01 78.9067 11.8883 479.00 474.00 5.00 468806 ZEP 2019 11 28 08 24 00 3680-99 P co CCGG 111.510 -999.990 ... AR2 2020 01 22 15 54 21 78.9067 11.8883 479.00 474.00 5.00 468807 ZEP 2019 12 06 09 10 00 1519-99 P co CCGG 123.630 -999.990 ... AR2 2020 02 03 12 25 53 78.9067 11.8883 479.00 474.00 5.00 469634 ZEP 2019 12 06 09 10 00 1520-99 P co CCGG 123.380 -999.990 ... AR2 2020 02 03 12 40 13 78.9067 11.8883 479.00 474.00 5.00 469633 ZEP 2019 12 12 08 15 00 129-99 P co CCGG 124.370 -999.990 ... AR2 2020 02 03 11 57 13 78.9067 11.8883 479.00 474.00 5.00 469631 ZEP 2019 12 12 08 15 00 130-99 P co CCGG 124.320 -999.990 ... AR2 2020 02 03 12 11 33 78.9067 11.8883 479.00 474.00 5.00 469632 ZEP 2019 12 19 08 30 00 3357-99 P co CCGG 119.840 -999.990 ... AR2 2020 02 14 11 42 06 78.9067 11.8883 479.00 474.00 5.00 470068 ZEP 2019 12 19 08 30 00 3358-99 P co CCGG 120.090 -999.990 ... AR2 2020 02 14 11 56 25 78.9067 11.8883 479.00 474.00 5.00 470069 ZEP 2019 12 26 12 42 00 5129-99 P co CCGG 122.880 -999.990 ... AR2 2020 02 14 15 03 18 78.9067 11.8883 479.00 474.00 5.00 470066 ZEP 2019 12 26 12 42 00 5130-99 P co CCGG 122.820 -999.990 ... AR2 2020 02 14 15 17 35 78.9067 11.8883 479.00 474.00 5.00 470067