# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Korea Centre for Atmospheric Environment # collaborator_name: Research [KCAER] # collaborator_url: http://www.kcaer.re.kr/v2/about/ # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: tap # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-08-31 16:47:49 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number TAP 1990 11 24 07 20 00 6348-66 P co CCGG 330.950 -999.990 ..C R4 1991 01 23 11 19 00 36.7300 126.1300 21.00 16.00 5.00 136069 TAP 1990 11 24 07 20 00 6348-66 P co CCGG -999.990 -999.990 *.. R4 1991 01 23 11 35 00 36.7300 126.1300 21.00 16.00 5.00 136069 TAP 1991 01 05 03 10 00 6358-66 P co CCGG 245.990 -999.990 ..C R4 1991 01 23 11 51 00 36.7300 126.1300 21.00 16.00 5.00 136071 TAP 1991 01 05 03 10 00 6358-66 P co CCGG 244.320 -999.990 ..C R4 1991 01 23 12 07 00 36.7300 126.1300 21.00 16.00 5.00 136071 TAP 1991 03 03 03 10 00 6372-66 P co CCGG 391.240 -999.990 ..C R4 1991 03 28 14 28 00 36.7300 126.1300 21.00 16.00 5.00 136073 TAP 1991 03 03 03 10 00 6372-66 P co CCGG 391.690 -999.990 ..C R4 1991 03 28 14 44 00 36.7300 126.1300 21.00 16.00 5.00 136073 TAP 1991 03 10 03 30 00 6390-66 P co CCGG 333.230 -999.990 ..C R4 1991 03 28 13 23 00 36.7300 126.1300 21.00 16.00 5.00 136075 TAP 1991 03 10 03 30 00 6390-66 P co CCGG 330.550 -999.990 ..C R4 1991 03 28 13 39 00 36.7300 126.1300 21.00 16.00 5.00 136075 TAP 1991 03 17 03 06 00 6376-66 P co CCGG 272.680 -999.990 ..C R4 1991 04 08 12 07 00 36.7300 126.1300 21.00 16.00 5.00 136077 TAP 1991 03 17 03 06 00 6376-66 P co CCGG 274.540 -999.990 ..C R4 1991 04 08 12 23 00 36.7300 126.1300 21.00 16.00 5.00 136077 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 368.280 -999.990 ..C R4 1991 04 05 10 04 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 364.390 -999.990 ..C R4 1991 04 05 10 20 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 365.470 -999.990 ..C R4 1991 04 05 10 36 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG -999.990 -999.990 *.. R4 1991 04 05 10 52 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 366.290 -999.990 ..C R4 1991 04 05 11 08 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 367.110 -999.990 ..C R4 1991 04 08 12 39 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 23 03 10 00 6364-66 P co CCGG 363.550 -999.990 ..C R4 1991 04 08 12 56 00 36.7300 126.1300 21.00 16.00 5.00 136079 TAP 1991 03 31 04 30 00 6392-66 P co CCGG -999.990 -999.990 *.. R4 1991 04 19 11 22 00 36.7300 126.1300 21.00 16.00 5.00 136081 TAP 1991 03 31 04 30 00 6392-66 P co CCGG 267.930 -999.990 ..C R4 1991 04 19 11 38 00 36.7300 126.1300 21.00 16.00 5.00 136081 TAP 1991 04 06 03 25 00 6388-66 P co CCGG 492.660 -999.990 .XC R4 1991 04 19 11 55 00 36.7300 126.1300 21.00 16.00 5.00 136083 TAP 1991 04 06 03 25 00 6388-66 P co CCGG 489.920 -999.990 .XC R4 1991 04 19 12 11 00 36.7300 126.1300 21.00 16.00 5.00 136083 TAP 1991 04 12 08 00 00 6058-66 P co CCGG -999.990 -999.990 *.. R4 1991 05 13 12 07 00 36.7300 126.1300 21.00 16.00 5.00 136085 TAP 1991 04 12 08 00 00 6058-66 P co CCGG 369.300 -999.990 ..C R4 1991 05 13 12 23 00 36.7300 126.1300 21.00 16.00 5.00 136085 TAP 1991 04 20 03 00 00 6282-66 P co CCGG 233.000 -999.990 ..C R4 1991 05 13 11 00 00 36.7300 126.1300 21.00 16.00 5.00 136087 TAP 1991 04 20 03 00 00 6282-66 P co CCGG 230.070 -999.990 ..C R4 1991 05 13 11 17 00 36.7300 126.1300 21.00 16.00 5.00 136087 TAP 1991 04 28 04 40 00 6248-66 P co CCGG 261.990 -999.990 ..C R4 1991 05 28 14 03 00 36.7300 126.1300 21.00 16.00 5.00 136089 TAP 1991 04 28 04 40 00 6248-66 P co CCGG 265.130 -999.990 ..C R4 1991 05 28 14 19 00 36.7300 126.1300 21.00 16.00 5.00 136089 TAP 1991 05 03 03 12 00 6240-66 P co CCGG 254.220 -999.990 ..C R4 1991 05 28 14 35 00 36.7300 126.1300 21.00 16.00 5.00 136091 TAP 1991 05 03 03 12 00 6240-66 P co CCGG -999.990 -999.990 *.. R4 1991 05 28 14 51 00 36.7300 126.1300 21.00 16.00 5.00 136091 TAP 1991 05 10 03 05 00 6348-66 P co CCGG 513.810 -999.990 .XC R4 1991 06 03 10 40 00 36.7300 126.1300 21.00 16.00 5.00 136093 TAP 1991 05 10 03 05 00 6348-66 P co CCGG 509.610 -999.990 .XC R4 1991 06 03 10 56 00 36.7300 126.1300 21.00 16.00 5.00 136093 TAP 1991 05 17 04 30 00 6130-66 P co CCGG 248.910 -999.990 Z.C R4 1991 06 03 10 08 00 36.7300 126.1300 21.00 16.00 5.00 136095 TAP 1991 05 17 04 30 00 6130-66 P co CCGG 244.790 -999.990 Z.C R4 1991 06 03 10 24 00 36.7300 126.1300 21.00 16.00 5.00 136095 TAP 1991 05 26 04 30 00 6308-66 P co CCGG 225.650 -999.990 Z.. R4 1991 06 12 10 40 00 36.7300 126.1300 21.00 16.00 5.00 136097 TAP 1991 05 26 04 30 00 6308-66 P co CCGG 221.600 -999.990 Z.. R4 1991 06 12 10 56 00 36.7300 126.1300 21.00 16.00 5.00 136097 TAP 1991 06 01 07 50 00 6314-66 P co CCGG 220.250 -999.990 ... R4 1991 06 12 11 13 00 36.7300 126.1300 21.00 16.00 5.00 136099 TAP 1991 06 01 07 50 00 6314-66 P co CCGG 222.500 -999.990 ... R4 1991 06 12 11 29 00 36.7300 126.1300 21.00 16.00 5.00 136099 TAP 1991 06 07 03 00 00 6046-66 P co CCGG 289.560 -999.990 ..C R4 1991 07 08 14 39 00 36.7300 126.1300 21.00 16.00 5.00 136101 TAP 1991 06 07 03 00 00 6046-66 P co CCGG 290.020 -999.990 ..C R4 1991 07 08 14 55 00 36.7300 126.1300 21.00 16.00 5.00 136101 TAP 1991 06 14 05 10 00 6238-66 P co CCGG 221.240 -999.990 ... R4 1991 07 08 15 44 00 36.7300 126.1300 21.00 16.00 5.00 136103 TAP 1991 06 14 05 10 00 6238-66 P co CCGG 220.120 -999.990 ... R4 1991 07 08 16 00 00 36.7300 126.1300 21.00 16.00 5.00 136103 TAP 1991 06 23 05 20 00 6009-66 P co CCGG 255.680 -999.990 ..C R4 1991 07 15 13 39 00 36.7300 126.1300 21.00 16.00 5.00 136104 TAP 1991 06 23 05 20 00 6009-66 P co CCGG 258.170 -999.990 ..C R4 1991 07 15 13 55 00 36.7300 126.1300 21.00 16.00 5.00 136104 TAP 1991 06 28 03 35 00 6132-66 P co CCGG 116.860 -999.990 ... R4 1991 07 15 14 11 00 36.7300 126.1300 21.00 16.00 5.00 136106 TAP 1991 06 28 03 35 00 6132-66 P co CCGG 117.490 -999.990 ... R4 1991 07 15 14 27 00 36.7300 126.1300 21.00 16.00 5.00 136106 TAP 1991 07 06 05 20 00 6248-66 P co CCGG 224.740 -999.990 ... R4 1991 07 31 12 01 00 36.7300 126.1300 21.00 16.00 5.00 136108 TAP 1991 07 06 05 20 00 6248-66 P co CCGG 223.790 -999.990 ... R4 1991 07 31 12 17 00 36.7300 126.1300 21.00 16.00 5.00 136108 TAP 1991 07 12 07 40 00 6340-66 P co CCGG 184.610 -999.990 ... R4 1991 07 31 11 29 00 36.7300 126.1300 21.00 16.00 5.00 136110 TAP 1991 07 12 07 40 00 6340-66 P co CCGG 186.340 -999.990 ... R4 1991 07 31 11 45 00 36.7300 126.1300 21.00 16.00 5.00 136110 TAP 1991 07 20 05 40 00 6078-66 P co CCGG 74.860 -999.990 ... R4 1991 08 05 11 38 00 36.7300 126.1300 21.00 16.00 5.00 136112 TAP 1991 07 20 05 40 00 6078-66 P co CCGG 74.400 -999.990 ... R4 1991 08 05 11 54 00 36.7300 126.1300 21.00 16.00 5.00 136112 TAP 1991 07 24 01 15 00 6034-66 P co CCGG 81.560 -999.990 ... R4 1991 08 05 12 10 00 36.7300 126.1300 21.00 16.00 5.00 136114 TAP 1991 07 24 01 15 00 6034-66 P co CCGG 79.520 -999.990 ... R4 1991 08 05 12 26 00 36.7300 126.1300 21.00 16.00 5.00 136114 TAP 1991 07 27 05 27 00 6173-66 P co CCGG 138.970 -999.990 ... R4 1991 08 28 14 04 00 36.7300 126.1300 21.00 16.00 5.00 136115 TAP 1991 07 27 05 27 00 6173-66 P co CCGG 140.290 -999.990 ... R4 1991 08 28 14 20 00 36.7300 126.1300 21.00 16.00 5.00 136115 TAP 1991 08 01 07 05 00 6026-66 P co CCGG 252.610 -999.990 ..C R4 1991 08 28 13 05 00 36.7300 126.1300 21.00 16.00 5.00 136117 TAP 1991 08 01 07 05 00 6026-66 P co CCGG 251.230 -999.990 ..C R4 1991 08 28 13 21 00 36.7300 126.1300 21.00 16.00 5.00 136117 TAP 1991 08 07 02 00 00 6064-66 P co CCGG 148.130 -999.990 ... R4 1991 09 19 15 36 00 36.7300 126.1300 21.00 16.00 5.00 136119 TAP 1991 08 07 02 00 00 6064-66 P co CCGG 149.440 -999.990 ... R4 1991 09 19 15 52 00 36.7300 126.1300 21.00 16.00 5.00 136119 TAP 1991 08 17 06 15 00 6378-66 P co CCGG 234.710 -999.990 ..C R4 1991 09 12 13 41 00 36.7300 126.1300 21.00 16.00 5.00 136121 TAP 1991 08 17 06 15 00 6378-66 P co CCGG 233.220 -999.990 ..C R4 1991 09 12 13 57 00 36.7300 126.1300 21.00 16.00 5.00 136121 TAP 1991 08 25 04 25 00 6373-66 P co CCGG 174.030 -999.990 ... R4 1991 09 16 09 02 00 36.7300 126.1300 21.00 16.00 5.00 136122 TAP 1991 08 25 04 25 00 6373-66 P co CCGG 176.010 -999.990 ... R4 1991 09 16 09 18 00 36.7300 126.1300 21.00 16.00 5.00 136122 TAP 1991 09 04 08 26 00 6222-66 P co CCGG 200.820 -999.990 ... R4 1991 09 19 13 58 00 36.7300 126.1300 21.00 16.00 5.00 136124 TAP 1991 09 04 08 26 00 6222-66 P co CCGG 199.860 -999.990 ... R4 1991 09 19 14 14 00 36.7300 126.1300 21.00 16.00 5.00 136124 TAP 1991 09 07 00 45 00 6223-66 P co CCGG 232.500 -999.990 ..C R4 1991 10 07 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136125 TAP 1991 09 07 00 45 00 6224-66 P co CCGG 232.830 -999.990 ..C R4 1991 10 07 13 38 00 36.7300 126.1300 21.00 16.00 5.00 136126 TAP 1991 09 17 07 05 00 6165-66 P co CCGG 179.550 -999.990 ... R4 1991 10 07 12 50 00 36.7300 126.1300 21.00 16.00 5.00 136127 TAP 1991 09 17 07 05 00 6166-66 P co CCGG 181.400 -999.990 ... R4 1991 10 07 13 06 00 36.7300 126.1300 21.00 16.00 5.00 136128 TAP 1991 09 24 09 00 00 6181-66 P co CCGG 187.520 -999.990 ... R4 1991 10 24 13 50 00 36.7300 126.1300 21.00 16.00 5.00 136129 TAP 1991 09 24 09 00 00 6182-66 P co CCGG 186.180 -999.990 ... R4 1991 10 24 14 06 00 36.7300 126.1300 21.00 16.00 5.00 136130 TAP 1991 10 02 05 58 00 6187-66 P co CCGG 300.320 -999.990 ..C R4 1991 10 24 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136131 TAP 1991 10 02 05 58 00 6188-66 P co CCGG 299.620 -999.990 ..C R4 1991 10 24 15 15 00 36.7300 126.1300 21.00 16.00 5.00 136132 TAP 1991 10 07 08 08 00 6129-66 P co CCGG 157.700 -999.990 ... R4 1991 11 19 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136133 TAP 1991 10 07 08 08 00 6130-66 P co CCGG 157.570 -999.990 ... R4 1991 11 19 10 02 00 36.7300 126.1300 21.00 16.00 5.00 136134 TAP 1991 10 15 07 20 00 6339-66 P co CCGG 207.160 -999.990 ... R4 1991 11 19 10 18 00 36.7300 126.1300 21.00 16.00 5.00 136135 TAP 1991 10 15 07 20 00 6340-66 P co CCGG 209.420 -999.990 ... R4 1991 11 19 10 34 00 36.7300 126.1300 21.00 16.00 5.00 136136 TAP 1991 10 20 00 40 00 6189-66 P co CCGG 166.440 -999.990 ... R4 1991 12 04 08 43 00 36.7300 126.1300 21.00 16.00 5.00 136137 TAP 1991 10 20 00 40 00 6190-66 P co CCGG 166.910 -999.990 ... R4 1991 12 04 08 59 00 36.7300 126.1300 21.00 16.00 5.00 136138 TAP 1991 10 27 06 20 00 6411-66 P co CCGG 166.860 -999.990 ... R4 1991 12 04 09 48 00 36.7300 126.1300 21.00 16.00 5.00 136139 TAP 1991 10 27 06 20 00 6412-66 P co CCGG 168.640 -999.990 ... R4 1991 12 04 10 04 00 36.7300 126.1300 21.00 16.00 5.00 136140 TAP 1991 11 04 08 30 00 6121-66 P co CCGG 512.230 -999.990 P.C R4 1991 12 17 21 59 00 36.7300 126.1300 21.00 16.00 5.00 136141 TAP 1991 11 04 08 30 00 6122-66 P co CCGG 499.170 -999.990 P.C R4 1991 12 17 22 15 00 36.7300 126.1300 21.00 16.00 5.00 136142 TAP 1991 11 17 08 25 00 6369-66 P co CCGG 155.900 -999.990 ... R4 1991 12 18 08 33 00 36.7300 126.1300 21.00 16.00 5.00 136143 TAP 1991 11 17 08 25 00 6370-66 P co CCGG 156.300 -999.990 ... R4 1991 12 18 08 49 00 36.7300 126.1300 21.00 16.00 5.00 136144 TAP 1991 11 30 04 00 00 6112-66 P co CCGG 463.690 -999.990 .XC R4 1992 01 08 12 14 00 36.7300 126.1300 21.00 16.00 5.00 136145 TAP 1991 12 12 08 20 00 6082-66 P co CCGG 351.690 -999.990 ..C R4 1992 01 08 11 26 00 36.7300 126.1300 21.00 16.00 5.00 136146 TAP 1991 12 12 08 20 00 6120-66 P co CCGG 355.870 -999.990 ..C R4 1992 01 08 11 42 00 36.7300 126.1300 21.00 16.00 5.00 136147 TAP 1991 12 17 07 00 00 6003-66 P co CCGG 187.770 -999.990 ... R4 1992 01 23 09 37 00 36.7300 126.1300 21.00 16.00 5.00 136148 TAP 1991 12 17 07 00 00 6004-66 P co CCGG 187.940 -999.990 ... R4 1992 01 23 09 53 00 36.7300 126.1300 21.00 16.00 5.00 136149 TAP 1991 12 27 06 40 00 6423-66 P co CCGG 303.600 -999.990 ..C R4 1992 01 23 11 15 00 36.7300 126.1300 21.00 16.00 5.00 136150 TAP 1992 01 03 03 50 00 6161-66 P co CCGG 372.860 -999.990 ..C R4 1992 02 07 11 58 00 36.7300 126.1300 21.00 16.00 5.00 136151 TAP 1992 01 03 03 50 00 6162-66 P co CCGG 370.330 -999.990 ..C R4 1992 02 07 12 14 00 36.7300 126.1300 21.00 16.00 5.00 136152 TAP 1992 01 12 04 20 00 6135-66 P co CCGG 403.060 -999.990 P.C R4 1992 02 07 12 30 00 36.7300 126.1300 21.00 16.00 5.00 136153 TAP 1992 01 12 04 20 00 6136-66 P co CCGG 359.630 -999.990 P.C R4 1992 02 07 12 46 00 36.7300 126.1300 21.00 16.00 5.00 136154 TAP 1992 01 17 05 00 00 6029-66 P co CCGG 233.520 -999.990 ..C R4 1992 02 24 12 50 00 36.7300 126.1300 21.00 16.00 5.00 136155 TAP 1992 01 17 05 00 00 6030-66 P co CCGG 233.220 -999.990 ..C R4 1992 02 24 13 07 00 36.7300 126.1300 21.00 16.00 5.00 136156 TAP 1992 01 26 05 20 00 6139-66 P co CCGG 517.740 -999.990 .XC R4 1992 02 24 09 16 00 36.7300 126.1300 21.00 16.00 5.00 136157 TAP 1992 01 26 05 20 00 6140-66 P co CCGG 516.490 -999.990 .XC R4 1992 02 24 09 32 00 36.7300 126.1300 21.00 16.00 5.00 136158 TAP 1992 01 31 04 40 00 6359-66 P co CCGG 314.410 -999.990 P.C R4 1992 03 04 11 44 00 36.7300 126.1300 21.00 16.00 5.00 136159 TAP 1992 01 31 04 40 00 6360-66 P co CCGG 318.830 -999.990 P.C R4 1992 03 04 12 01 00 36.7300 126.1300 21.00 16.00 5.00 136160 TAP 1992 02 08 04 05 00 6073-66 P co CCGG 219.200 -999.990 ... R4 1992 03 04 11 11 00 36.7300 126.1300 21.00 16.00 5.00 136161 TAP 1992 02 08 04 05 00 6074-66 P co CCGG 219.000 -999.990 ... R4 1992 03 04 11 27 00 36.7300 126.1300 21.00 16.00 5.00 136162 TAP 1992 02 14 03 20 00 6383-66 P co CCGG 276.820 -999.990 ..C R4 1992 03 13 14 22 00 36.7300 126.1300 21.00 16.00 5.00 136163 TAP 1992 02 14 03 20 00 6384-66 P co CCGG 276.740 -999.990 ..C R4 1992 03 13 14 38 00 36.7300 126.1300 21.00 16.00 5.00 136164 TAP 1992 02 23 06 20 00 6269-66 P co CCGG 317.660 -999.990 ..C R4 1992 03 13 15 01 00 36.7300 126.1300 21.00 16.00 5.00 136165 TAP 1992 02 23 06 20 00 6270-66 P co CCGG 318.100 -999.990 ..C R4 1992 03 13 15 17 00 36.7300 126.1300 21.00 16.00 5.00 136166 TAP 1992 02 28 01 15 00 6249-66 P co CCGG -999.990 -999.990 *.. R4 1992 03 13 09 53 00 36.7300 126.1300 21.00 16.00 5.00 136167 TAP 1992 02 28 01 15 00 6250-66 P co CCGG -999.990 -999.990 *.. R4 1992 03 13 10 09 00 36.7300 126.1300 21.00 16.00 5.00 136168 TAP 1992 02 28 01 15 00 6363-66 P co CCGG 315.080 -999.990 ..C R4 1992 03 13 09 21 00 36.7300 126.1300 21.00 16.00 5.00 136169 TAP 1992 02 28 01 15 00 6364-66 P co CCGG 314.620 -999.990 ..C R4 1992 03 13 09 37 00 36.7300 126.1300 21.00 16.00 5.00 136170 TAP 1992 03 06 04 00 00 6007-66 P co CCGG 548.350 -999.990 .XC R4 1992 04 09 10 31 00 36.7300 126.1300 21.00 16.00 5.00 136171 TAP 1992 03 06 04 00 00 6008-66 P co CCGG 551.970 -999.990 .XC R4 1992 04 09 10 47 00 36.7300 126.1300 21.00 16.00 5.00 136172 TAP 1992 03 06 04 50 00 6095-66 P co CCGG 263.400 -999.990 P.C R4 1992 04 09 08 54 00 36.7300 126.1300 21.00 16.00 5.00 136173 TAP 1992 03 06 04 50 00 6096-66 P co CCGG 256.430 -999.990 P.C R4 1992 04 09 09 10 00 36.7300 126.1300 21.00 16.00 5.00 136174 TAP 1992 03 13 01 10 00 6055-66 P co CCGG -999.990 -999.990 *.. R4 1992 04 09 17 04 00 36.7300 126.1300 21.00 16.00 5.00 136175 TAP 1992 03 13 01 10 00 6056-66 P co CCGG -999.990 -999.990 *.. R4 1992 04 09 17 20 00 36.7300 126.1300 21.00 16.00 5.00 136176 TAP 1992 03 13 01 13 00 6047-66 P co CCGG 528.800 -999.990 .XC R4 1992 04 09 16 47 00 36.7300 126.1300 21.00 16.00 5.00 136177 TAP 1992 03 20 03 20 00 6221-66 P co CCGG 747.940 -999.990 P.C R4 1992 04 09 17 36 00 36.7300 126.1300 21.00 16.00 5.00 136179 TAP 1992 03 20 03 20 00 6222-66 P co CCGG 744.230 -999.990 P.C R4 1992 04 09 17 52 00 36.7300 126.1300 21.00 16.00 5.00 136180 TAP 1992 03 20 03 20 00 6273-66 P co CCGG 562.630 -999.990 P.C R4 1992 04 09 16 15 00 36.7300 126.1300 21.00 16.00 5.00 136181 TAP 1992 03 20 03 20 00 6274-66 P co CCGG 557.760 -999.990 P.C R4 1992 04 09 16 31 00 36.7300 126.1300 21.00 16.00 5.00 136182 TAP 1992 03 27 09 28 00 6229-66 P co CCGG 342.740 -999.990 ..C R4 1992 05 14 17 20 00 36.7300 126.1300 21.00 16.00 5.00 136183 TAP 1992 03 27 09 28 00 6230-66 P co CCGG 343.500 -999.990 ..C R4 1992 05 14 17 36 00 36.7300 126.1300 21.00 16.00 5.00 136184 TAP 1992 04 03 01 30 00 6349-66 P co CCGG 359.880 -999.990 ..C R4 1992 05 15 07 09 00 36.7300 126.1300 21.00 16.00 5.00 136185 TAP 1992 04 03 01 30 00 6350-66 P co CCGG 356.390 -999.990 ..C R4 1992 05 15 07 25 00 36.7300 126.1300 21.00 16.00 5.00 136186 TAP 1992 04 11 02 37 00 6060-66 P co CCGG 519.970 -999.990 P.C R4 1992 06 03 12 53 00 36.7300 126.1300 21.00 16.00 5.00 136187 TAP 1992 04 11 02 37 00 6337-66 P co CCGG 252.200 -999.990 P.C R4 1992 06 03 12 37 00 36.7300 126.1300 21.00 16.00 5.00 136188 TAP 1992 04 17 04 40 00 6443-66 P co CCGG 248.450 -999.990 P.C R4 1992 06 03 11 55 00 36.7300 126.1300 21.00 16.00 5.00 136189 TAP 1992 04 17 04 40 00 6444-66 P co CCGG 243.750 -999.990 P.C R4 1992 06 03 12 11 00 36.7300 126.1300 21.00 16.00 5.00 136190 TAP 1992 04 24 01 31 00 6059-66 P co CCGG 229.320 -999.990 ... R4 1992 06 03 10 19 00 36.7300 126.1300 21.00 16.00 5.00 136191 TAP 1992 04 24 01 31 00 6338-66 P co CCGG 229.770 -999.990 ... R4 1992 06 03 10 35 00 36.7300 126.1300 21.00 16.00 5.00 136192 TAP 1992 05 01 02 50 00 6671-66 P co CCGG 410.070 -999.990 ..C R4 1992 06 03 08 30 00 36.7300 126.1300 21.00 16.00 5.00 136193 TAP 1992 05 01 02 50 00 6672-66 P co CCGG 408.010 -999.990 ..C R4 1992 06 03 08 46 00 36.7300 126.1300 21.00 16.00 5.00 136194 TAP 1992 05 08 01 25 00 6189-66 P co CCGG 398.840 -999.990 ..C R4 1992 06 03 09 34 00 36.7300 126.1300 21.00 16.00 5.00 136195 TAP 1992 05 08 01 25 00 6190-66 P co CCGG 396.770 -999.990 ..C R4 1992 06 03 09 51 00 36.7300 126.1300 21.00 16.00 5.00 136196 TAP 1992 05 15 01 20 00 6033-66 P co CCGG 333.780 -999.990 ..C R4 1992 06 03 09 02 00 36.7300 126.1300 21.00 16.00 5.00 136197 TAP 1992 05 15 01 20 00 6034-66 P co CCGG 333.220 -999.990 ..C R4 1992 06 03 09 18 00 36.7300 126.1300 21.00 16.00 5.00 136198 TAP 1992 05 22 01 06 00 6529-66 P co CCGG 518.760 -999.990 .XC R4 1992 06 12 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136199 TAP 1992 05 22 01 06 00 6530-66 P co CCGG 517.790 -999.990 .XC R4 1992 06 12 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136200 TAP 1992 05 29 01 30 00 6351-66 P co CCGG 237.890 -999.990 ..C R4 1992 06 12 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136201 TAP 1992 05 29 01 30 00 6352-66 P co CCGG 235.380 -999.990 ..C R4 1992 06 12 14 33 00 36.7300 126.1300 21.00 16.00 5.00 136202 TAP 1992 06 05 05 20 00 6513-66 P co CCGG 264.140 -999.990 ..C R4 1992 06 25 15 11 00 36.7300 126.1300 21.00 16.00 5.00 136203 TAP 1992 06 12 01 16 00 6217-66 P co CCGG 266.770 -999.990 ..C R4 1992 06 25 13 49 00 36.7300 126.1300 21.00 16.00 5.00 136204 TAP 1992 06 12 01 16 00 6218-66 P co CCGG 270.040 -999.990 ..C R4 1992 06 25 14 05 00 36.7300 126.1300 21.00 16.00 5.00 136205 TAP 1992 06 19 01 30 00 6465-66 P co CCGG 258.830 -999.990 ..C R4 1992 07 21 10 16 00 36.7300 126.1300 21.00 16.00 5.00 136206 TAP 1992 06 19 01 30 00 6466-66 P co CCGG 258.370 -999.990 ..C R4 1992 07 21 10 33 00 36.7300 126.1300 21.00 16.00 5.00 136207 TAP 1992 06 26 01 15 00 6219-66 P co CCGG 170.360 -999.990 ... R4 1992 07 21 09 44 00 36.7300 126.1300 21.00 16.00 5.00 136208 TAP 1992 06 26 01 15 00 6220-66 P co CCGG 168.920 -999.990 ... R4 1992 07 21 10 00 00 36.7300 126.1300 21.00 16.00 5.00 136209 TAP 1992 07 04 02 06 00 6445-66 P co CCGG 360.380 -999.990 .XC R4 1992 08 28 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136210 TAP 1992 07 04 02 06 00 6446-66 P co CCGG 359.840 -999.990 .XC R4 1992 08 28 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136211 TAP 1992 07 11 02 23 00 6567-66 P co CCGG 177.440 -999.990 ... R4 1992 08 28 11 58 00 36.7300 126.1300 21.00 16.00 5.00 136212 TAP 1992 07 11 02 23 00 6568-66 P co CCGG 177.360 -999.990 ... R4 1992 08 28 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136213 TAP 1992 07 18 03 10 00 6815-66 P co CCGG 522.640 -999.990 .XC R4 1992 09 01 09 04 00 36.7300 126.1300 21.00 16.00 5.00 136214 TAP 1992 07 18 03 10 00 6816-66 P co CCGG 524.760 -999.990 .XC R4 1992 09 01 09 20 00 36.7300 126.1300 21.00 16.00 5.00 136215 TAP 1992 07 20 03 40 00 6813-66 P co CCGG 106.380 -999.990 ... R4 1992 09 01 08 32 00 36.7300 126.1300 21.00 16.00 5.00 136216 TAP 1992 07 20 03 40 00 6814-66 P co CCGG 106.370 -999.990 ... R4 1992 09 01 08 48 00 36.7300 126.1300 21.00 16.00 5.00 136217 TAP 1992 07 21 03 30 00 6311-66 P co CCGG 74.720 -999.990 ... R4 1992 08 28 15 10 00 36.7300 126.1300 21.00 16.00 5.00 136218 TAP 1992 07 21 03 30 00 6312-66 P co CCGG 74.090 -999.990 ... R4 1992 08 28 15 26 00 36.7300 126.1300 21.00 16.00 5.00 136219 TAP 1992 07 22 05 30 00 6085-66 P co CCGG 89.960 -999.990 ... R4 1992 08 28 14 37 00 36.7300 126.1300 21.00 16.00 5.00 136220 TAP 1992 07 22 05 30 00 6086-66 P co CCGG 87.830 -999.990 ... R4 1992 08 28 14 53 00 36.7300 126.1300 21.00 16.00 5.00 136221 TAP 1992 07 23 05 40 00 6691-66 P co CCGG 134.690 -999.990 ... R4 1992 09 01 10 31 00 36.7300 126.1300 21.00 16.00 5.00 136222 TAP 1992 07 23 05 40 00 6692-66 P co CCGG 131.920 -999.990 ... R4 1992 09 01 10 47 00 36.7300 126.1300 21.00 16.00 5.00 136223 TAP 1992 07 24 03 07 00 6269-66 P co CCGG 83.370 -999.990 ... R4 1992 09 01 11 03 00 36.7300 126.1300 21.00 16.00 5.00 136224 TAP 1992 07 24 03 07 00 6270-66 P co CCGG 83.270 -999.990 ... R4 1992 09 01 11 19 00 36.7300 126.1300 21.00 16.00 5.00 136225 TAP 1992 07 25 03 10 00 6319-66 P co CCGG 85.310 -999.990 ... R4 1992 09 01 11 43 00 36.7300 126.1300 21.00 16.00 5.00 136226 TAP 1992 07 25 03 10 00 6320-66 P co CCGG 83.600 -999.990 ... R4 1992 09 01 11 59 00 36.7300 126.1300 21.00 16.00 5.00 136227 TAP 1992 07 26 02 35 00 6467-66 P co CCGG 83.240 -999.990 ... R4 1992 09 01 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136228 TAP 1992 07 26 02 35 00 6674-66 P co CCGG 83.940 -999.990 ... R4 1992 09 01 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136229 TAP 1992 08 01 01 00 00 6569-66 P co CCGG 268.190 -999.990 ..C R4 1992 09 01 13 19 00 36.7300 126.1300 21.00 16.00 5.00 136230 TAP 1992 08 01 01 00 00 6570-66 P co CCGG 266.830 -999.990 ..C R4 1992 09 01 13 35 00 36.7300 126.1300 21.00 16.00 5.00 136231 TAP 1992 08 08 01 40 00 6573-66 P co CCGG 250.260 -999.990 ..C R4 1992 09 01 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136232 TAP 1992 08 08 01 40 00 6574-66 P co CCGG 247.800 -999.990 ..C R4 1992 09 01 13 03 00 36.7300 126.1300 21.00 16.00 5.00 136233 TAP 1992 08 15 06 18 00 6237-66 P co CCGG 168.140 -999.990 ... R4 1992 09 16 12 38 00 36.7300 126.1300 21.00 16.00 5.00 136234 TAP 1992 08 15 06 18 00 6238-66 P co CCGG 166.680 -999.990 ... R4 1992 09 16 12 54 00 36.7300 126.1300 21.00 16.00 5.00 136235 TAP 1992 08 22 02 19 00 6001-66 P co CCGG 123.990 -999.990 ... R4 1992 09 16 12 06 00 36.7300 126.1300 21.00 16.00 5.00 136236 TAP 1992 08 22 02 19 00 6002-66 P co CCGG 122.730 -999.990 ... R4 1992 09 16 12 22 00 36.7300 126.1300 21.00 16.00 5.00 136237 TAP 1992 08 31 06 30 00 6321-66 P co CCGG 162.810 -999.990 ... R4 1992 10 13 12 49 00 36.7300 126.1300 21.00 16.00 5.00 136238 TAP 1992 08 31 06 30 00 6322-66 P co CCGG 162.760 -999.990 ... R4 1992 10 13 13 05 00 36.7300 126.1300 21.00 16.00 5.00 136239 TAP 1992 09 12 00 10 00 6165-66 P co CCGG 393.780 -999.990 .XC R4 1992 10 13 14 37 00 36.7300 126.1300 21.00 16.00 5.00 136240 TAP 1992 09 12 00 10 00 6166-66 P co CCGG 387.770 -999.990 .XC R4 1992 10 13 14 53 00 36.7300 126.1300 21.00 16.00 5.00 136241 TAP 1992 09 19 01 30 00 6805-66 P co CCGG 322.280 -999.990 P.C R4 1992 10 26 15 29 00 36.7300 126.1300 21.00 16.00 5.00 136242 TAP 1992 09 19 01 30 00 6806-66 P co CCGG 313.550 -999.990 P.C R4 1992 10 26 15 45 00 36.7300 126.1300 21.00 16.00 5.00 136243 TAP 1992 09 26 01 08 00 6429-66 P co CCGG 172.640 -999.990 ... R4 1992 10 26 14 56 00 36.7300 126.1300 21.00 16.00 5.00 136244 TAP 1992 09 26 01 08 00 6430-66 P co CCGG 171.510 -999.990 ... R4 1992 10 26 15 12 00 36.7300 126.1300 21.00 16.00 5.00 136245 TAP 1992 10 05 03 16 00 6357-66 P co CCGG 146.510 -999.990 ... R4 1992 12 02 11 50 00 36.7300 126.1300 21.00 16.00 5.00 136246 TAP 1992 10 05 03 16 00 6358-66 P co CCGG 147.860 -999.990 ... R4 1992 12 02 12 06 00 36.7300 126.1300 21.00 16.00 5.00 136247 TAP 1992 10 05 03 35 00 6209-66 P co CCGG 164.410 -999.990 ... R4 1992 12 02 12 22 00 36.7300 126.1300 21.00 16.00 5.00 136248 TAP 1992 10 05 03 35 00 6210-66 P co CCGG 163.820 -999.990 ... R4 1992 12 02 12 38 00 36.7300 126.1300 21.00 16.00 5.00 136249 TAP 1992 10 10 00 08 00 6735-66 P co CCGG 333.130 -999.990 ..C R4 1992 11 24 13 50 00 36.7300 126.1300 21.00 16.00 5.00 136250 TAP 1992 10 17 04 40 00 6532-66 P co CCGG 279.430 -999.990 ..C R4 1992 11 24 14 06 00 36.7300 126.1300 21.00 16.00 5.00 136252 TAP 1992 10 24 07 55 00 6211-66 P co CCGG 155.100 -999.990 ... R4 1992 12 07 12 00 00 36.7300 126.1300 21.00 16.00 5.00 136253 TAP 1992 10 24 07 55 00 6212-66 P co CCGG 154.250 -999.990 ... R4 1992 12 07 12 16 00 36.7300 126.1300 21.00 16.00 5.00 136254 TAP 1992 10 31 02 40 00 6547-66 P co CCGG 196.330 -999.990 ... R4 1992 12 07 12 35 00 36.7300 126.1300 21.00 16.00 5.00 136255 TAP 1992 10 31 02 40 00 6548-66 P co CCGG 196.500 -999.990 ... R4 1992 12 07 12 51 00 36.7300 126.1300 21.00 16.00 5.00 136256 TAP 1992 11 06 03 00 00 6303-66 P co CCGG 333.810 -999.990 .XC R4 1992 12 10 10 41 00 36.7300 126.1300 21.00 16.00 5.00 136257 TAP 1992 11 06 03 00 00 6304-66 P co CCGG 333.860 -999.990 .XC R4 1992 12 10 10 57 00 36.7300 126.1300 21.00 16.00 5.00 136258 TAP 1992 11 14 01 28 00 6147-66 P co CCGG 449.370 -999.990 .XC R4 1992 12 10 11 13 00 36.7300 126.1300 21.00 16.00 5.00 136259 TAP 1992 11 14 01 28 00 6148-66 P co CCGG 448.160 -999.990 .XC R4 1992 12 10 11 29 00 36.7300 126.1300 21.00 16.00 5.00 136260 TAP 1992 11 17 01 42 00 6537-66 P co CCGG 229.100 -999.990 P.. R4 1992 12 10 12 18 00 36.7300 126.1300 21.00 16.00 5.00 136261 TAP 1992 11 17 01 42 00 6538-66 P co CCGG 241.070 -999.990 P.C R4 1992 12 10 12 34 00 36.7300 126.1300 21.00 16.00 5.00 136262 TAP 1992 11 21 03 40 00 6427-66 P co CCGG 147.970 -999.990 ... R4 1992 12 10 11 46 00 36.7300 126.1300 21.00 16.00 5.00 136263 TAP 1992 11 21 03 40 00 6428-66 P co CCGG 147.590 -999.990 ... R4 1992 12 10 12 02 00 36.7300 126.1300 21.00 16.00 5.00 136264 TAP 1992 11 27 01 36 00 6007-66 P co CCGG 378.930 -999.990 .XC R4 1993 01 14 12 16 00 36.7300 126.1300 21.00 16.00 5.00 136265 TAP 1992 11 27 01 36 00 6008-66 P co CCGG 379.200 -999.990 .XC R4 1993 01 14 12 32 00 36.7300 126.1300 21.00 16.00 5.00 136266 TAP 1992 12 13 01 21 00 6541-66 P co CCGG 243.860 -999.990 ..C R4 1993 01 14 11 43 00 36.7300 126.1300 21.00 16.00 5.00 136267 TAP 1992 12 13 01 21 00 6542-66 P co CCGG 245.450 -999.990 ..C R4 1993 01 14 12 00 00 36.7300 126.1300 21.00 16.00 5.00 136268 TAP 1992 12 22 05 41 00 6273-66 P co CCGG 183.630 -999.990 ... R4 1993 02 26 14 42 00 36.7300 126.1300 21.00 16.00 5.00 136269 TAP 1992 12 22 05 41 00 6274-66 P co CCGG 181.920 -999.990 ... R4 1993 02 26 14 58 00 36.7300 126.1300 21.00 16.00 5.00 136270 TAP 1993 01 09 05 50 00 6067-66 P co CCGG 336.660 -999.990 P.C R4 1993 03 01 09 30 00 36.7300 126.1300 21.00 16.00 5.00 136271 TAP 1993 01 09 05 50 00 6068-66 P co CCGG 325.460 -999.990 P.C R4 1993 03 01 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136272 TAP 1993 01 16 02 06 00 6251-66 P co CCGG 161.750 -999.990 P.. R4 1993 02 26 15 14 00 36.7300 126.1300 21.00 16.00 5.00 136273 TAP 1993 01 16 02 06 00 6252-66 P co CCGG 150.140 -999.990 P.. R4 1993 02 26 15 30 00 36.7300 126.1300 21.00 16.00 5.00 136274 TAP 1993 01 27 07 10 00 6233-66 P co CCGG 193.580 -999.990 P.. R4 1993 02 26 10 54 00 36.7300 126.1300 21.00 16.00 5.00 136275 TAP 1993 01 27 07 10 00 6234-66 P co CCGG 188.130 -999.990 P.. R4 1993 02 26 11 10 00 36.7300 126.1300 21.00 16.00 5.00 136276 TAP 1993 02 01 05 02 00 6809-66 P co CCGG 242.230 -999.990 P.C R4 1993 03 01 10 34 00 36.7300 126.1300 21.00 16.00 5.00 136277 TAP 1993 02 01 05 02 00 6810-66 P co CCGG 237.830 -999.990 P.C R4 1993 03 01 10 51 00 36.7300 126.1300 21.00 16.00 5.00 136278 TAP 1993 02 08 06 00 00 6623-66 P co CCGG 241.000 -999.990 ..C R4 1993 03 01 10 02 00 36.7300 126.1300 21.00 16.00 5.00 136279 TAP 1993 02 08 06 00 00 6624-66 P co CCGG 240.270 -999.990 ..C R4 1993 03 01 10 18 00 36.7300 126.1300 21.00 16.00 5.00 136280 TAP 1993 02 23 02 28 00 6209-66 P co CCGG 217.710 -999.990 ... R4 1993 04 07 09 56 00 36.7300 126.1300 21.00 16.00 5.00 136281 TAP 1993 02 23 02 28 00 6210-66 P co CCGG 215.900 -999.990 ... R4 1993 04 07 10 12 00 36.7300 126.1300 21.00 16.00 5.00 136282 TAP 1993 03 02 03 16 00 6173-66 P co CCGG 214.960 -999.990 ... R4 1993 04 07 08 52 00 36.7300 126.1300 21.00 16.00 5.00 136283 TAP 1993 03 02 03 16 00 6174-66 P co CCGG 214.020 -999.990 ... R4 1993 04 07 09 08 00 36.7300 126.1300 21.00 16.00 5.00 136284 TAP 1993 03 12 03 05 00 6813-66 P co CCGG 319.770 -999.990 P.C R4 1993 04 12 10 30 00 36.7300 126.1300 21.00 16.00 5.00 136285 TAP 1993 03 12 03 05 00 6814-66 P co CCGG 316.100 -999.990 P.C R4 1993 04 12 10 46 00 36.7300 126.1300 21.00 16.00 5.00 136286 TAP 1993 03 16 04 28 00 6693-66 P co CCGG 276.330 -999.990 P.C R4 1993 04 07 16 22 00 36.7300 126.1300 21.00 16.00 5.00 136287 TAP 1993 03 16 04 28 00 6694-66 P co CCGG 279.840 -999.990 P.C R4 1993 04 07 16 38 00 36.7300 126.1300 21.00 16.00 5.00 136288 TAP 1993 03 27 01 29 00 6911-66 P co CCGG 396.920 -999.990 P.C R4 1993 06 25 08 37 00 36.7300 126.1300 21.00 16.00 5.00 136289 TAP 1993 03 27 01 29 00 6912-66 P co CCGG 393.540 -999.990 P.C R4 1993 06 25 08 53 00 36.7300 126.1300 21.00 16.00 5.00 136290 TAP 1993 03 29 05 08 00 6259-66 P co CCGG 264.690 -999.990 ..C R4 1993 06 24 14 19 00 36.7300 126.1300 21.00 16.00 5.00 136291 TAP 1993 03 29 05 08 00 6260-66 P co CCGG 263.330 -999.990 ..C R4 1993 06 24 14 35 00 36.7300 126.1300 21.00 16.00 5.00 136292 TAP 1993 04 07 04 43 00 6303-66 P co CCGG 189.550 -999.990 ... R4 1993 06 04 12 06 00 36.7300 126.1300 21.00 16.00 5.00 136293 TAP 1993 04 07 04 43 00 6304-66 P co CCGG 188.400 -999.990 ... R4 1993 06 04 12 22 00 36.7300 126.1300 21.00 16.00 5.00 136294 TAP 1993 04 17 06 29 00 6221-66 P co CCGG 278.430 -999.990 ..C R4 1993 06 04 10 59 00 36.7300 126.1300 21.00 16.00 5.00 136295 TAP 1993 04 17 06 29 00 6222-66 P co CCGG 279.130 -999.990 ..C R4 1993 06 04 11 15 00 36.7300 126.1300 21.00 16.00 5.00 136296 TAP 1993 04 23 05 05 00 6501-66 P co CCGG 382.560 -999.990 ..C R4 1993 06 04 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136297 TAP 1993 04 23 05 05 00 6502-66 P co CCGG 380.990 -999.990 ..C R4 1993 06 04 10 38 00 36.7300 126.1300 21.00 16.00 5.00 136298 TAP 1993 05 02 08 20 00 6183-66 P co CCGG 201.550 -999.990 ... R4 1993 06 04 09 49 00 36.7300 126.1300 21.00 16.00 5.00 136299 TAP 1993 05 02 08 20 00 6184-66 P co CCGG 203.710 -999.990 ... R4 1993 06 04 10 05 00 36.7300 126.1300 21.00 16.00 5.00 136300 TAP 1993 05 07 02 28 00 6833-66 P co CCGG 295.630 -999.990 ..C R4 1993 06 04 13 51 00 36.7300 126.1300 21.00 16.00 5.00 136301 TAP 1993 05 14 04 47 00 6747-66 P co CCGG 245.060 -999.990 P.C R4 1993 06 04 08 45 00 36.7300 126.1300 21.00 16.00 5.00 136302 TAP 1993 05 14 04 47 00 6748-66 P co CCGG 241.930 -999.990 P.C R4 1993 06 04 09 01 00 36.7300 126.1300 21.00 16.00 5.00 136303 TAP 1993 06 05 00 45 00 6479-66 P co CCGG 250.390 -999.990 P.C R4 1993 06 29 15 05 00 36.7300 126.1300 21.00 16.00 5.00 136304 TAP 1993 06 05 00 45 00 6480-66 P co CCGG 245.810 -999.990 P.C R4 1993 06 29 15 21 00 36.7300 126.1300 21.00 16.00 5.00 136305 TAP 1993 06 23 05 04 00 6189-66 P co CCGG 289.540 -999.990 ..C R4 1993 08 12 13 19 00 36.7300 126.1300 21.00 16.00 5.00 136306 TAP 1993 06 23 05 04 00 6190-66 P co CCGG 291.830 -999.990 ..C R4 1993 08 12 13 36 00 36.7300 126.1300 21.00 16.00 5.00 136307 TAP 1993 07 02 08 35 00 6869-66 P co CCGG 196.370 -999.990 ... R4 1993 08 12 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136308 TAP 1993 07 02 08 35 00 6870-66 P co CCGG 196.230 -999.990 ... R4 1993 08 12 13 03 00 36.7300 126.1300 21.00 16.00 5.00 136309 TAP 1993 07 05 06 50 00 6909-66 P co CCGG 283.500 -999.990 ..C R4 1993 08 12 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136310 TAP 1993 07 05 06 50 00 6910-66 P co CCGG 281.970 -999.990 ..C R4 1993 08 12 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136311 TAP 1993 07 18 05 07 00 6519-66 P co CCGG 157.270 -999.990 ... R4 1993 08 12 11 00 00 36.7300 126.1300 21.00 16.00 5.00 136312 TAP 1993 07 18 05 07 00 6520-66 P co CCGG 156.620 -999.990 ... R4 1993 08 12 11 16 00 36.7300 126.1300 21.00 16.00 5.00 136313 TAP 1993 07 28 06 15 00 6565-66 P co CCGG 180.200 -999.990 ... R4 1993 09 22 09 23 00 36.7300 126.1300 21.00 16.00 5.00 136314 TAP 1993 07 28 06 15 00 6566-66 P co CCGG 179.270 -999.990 ... R4 1993 09 22 09 39 00 36.7300 126.1300 21.00 16.00 5.00 136315 TAP 1993 08 26 04 33 00 6921-66 P co CCGG 268.730 -999.990 P.C R4 1993 09 22 09 55 00 36.7300 126.1300 21.00 16.00 5.00 136316 TAP 1993 08 26 04 33 00 6922-66 P co CCGG 264.520 -999.990 P.C R4 1993 09 22 10 11 00 36.7300 126.1300 21.00 16.00 5.00 136317 TAP 1993 09 02 05 50 00 6371-66 P co CCGG 374.650 -999.990 P.C R4 1993 11 17 09 56 00 36.7300 126.1300 21.00 16.00 5.00 136318 TAP 1993 09 02 05 50 00 6372-66 P co CCGG 371.710 -999.990 P.C R4 1993 11 17 10 12 00 36.7300 126.1300 21.00 16.00 5.00 136319 TAP 1993 09 08 01 47 00 6929-66 P co CCGG 233.200 -999.990 ..C R4 1993 11 17 09 24 00 36.7300 126.1300 21.00 16.00 5.00 136320 TAP 1993 09 08 01 47 00 6930-66 P co CCGG 232.500 -999.990 ..C R4 1993 11 17 09 40 00 36.7300 126.1300 21.00 16.00 5.00 136321 TAP 1993 09 18 03 03 00 6099-66 P co CCGG 155.170 -999.990 ... R4 1993 12 06 15 07 00 36.7300 126.1300 21.00 16.00 5.00 136322 TAP 1993 09 18 03 03 00 6100-66 P co CCGG 153.600 -999.990 ... R4 1993 12 06 15 23 00 36.7300 126.1300 21.00 16.00 5.00 136323 TAP 1993 09 25 08 25 00 6335-66 P co CCGG 192.050 -999.990 ... R4 1993 12 06 14 35 00 36.7300 126.1300 21.00 16.00 5.00 136324 TAP 1993 09 25 08 25 00 6336-66 P co CCGG 191.180 -999.990 ... R4 1993 12 06 14 51 00 36.7300 126.1300 21.00 16.00 5.00 136325 TAP 1993 10 10 06 32 00 6325-66 P co CCGG 178.140 -999.990 ... R4 1993 11 17 09 07 00 36.7300 126.1300 21.00 16.00 5.00 136326 TAP 1993 11 11 03 20 00 6629-66 P co CCGG 203.140 -999.990 ... R4 1994 01 03 15 56 00 36.7300 126.1300 21.00 16.00 5.00 136328 TAP 1993 11 11 03 20 00 6630-66 P co CCGG 200.960 -999.990 ... R4 1994 01 03 16 12 00 36.7300 126.1300 21.00 16.00 5.00 136329 TAP 1993 11 19 01 50 00 6293-66 P co CCGG 301.400 -999.990 ..C R4 1994 01 03 15 20 00 36.7300 126.1300 21.00 16.00 5.00 136330 TAP 1993 11 27 03 36 00 6055-66 P co CCGG 298.390 -999.990 ..C R4 1994 01 07 11 59 00 36.7300 126.1300 21.00 16.00 5.00 136331 TAP 1993 11 27 03 36 00 6056-66 P co CCGG 298.060 -999.990 ..C R4 1994 01 07 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136332 TAP 1993 12 14 03 50 00 6713-66 P co CCGG 204.610 -999.990 ... R4 1994 01 07 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136333 TAP 1993 12 14 03 50 00 6714-66 P co CCGG 204.610 -999.990 ... R4 1994 01 07 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136334 TAP 1993 12 27 03 02 00 6323-66 P co CCGG 190.430 -999.990 ... R4 1994 01 25 09 14 00 36.7300 126.1300 21.00 16.00 5.00 136335 TAP 1993 12 27 03 02 00 6324-66 P co CCGG 189.350 -999.990 ... R4 1994 01 25 09 30 00 36.7300 126.1300 21.00 16.00 5.00 136336 TAP 1993 12 31 05 38 00 6329-66 P co CCGG 295.480 -999.990 ..C R4 1994 01 25 08 41 00 36.7300 126.1300 21.00 16.00 5.00 136337 TAP 1993 12 31 05 38 00 6330-66 P co CCGG 293.590 -999.990 ..C R4 1994 01 25 08 58 00 36.7300 126.1300 21.00 16.00 5.00 136338 TAP 1994 01 07 06 40 00 6409-66 P co CCGG 232.590 -999.990 ..C R4 1994 03 08 14 01 00 36.7300 126.1300 21.00 16.00 5.00 136339 TAP 1994 01 07 06 40 00 6410-66 P co CCGG 230.980 -999.990 ..C R4 1994 03 08 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136340 TAP 1994 01 18 03 02 00 6517-66 P co CCGG 228.250 -999.990 ... R4 1994 03 08 14 33 00 36.7300 126.1300 21.00 16.00 5.00 136341 TAP 1994 01 18 03 02 00 6518-66 P co CCGG 227.580 -999.990 ... R4 1994 03 08 14 49 00 36.7300 126.1300 21.00 16.00 5.00 136342 TAP 1994 01 29 07 16 00 6663-66 P co CCGG 279.420 -999.990 ..C R4 1994 03 08 13 45 00 36.7300 126.1300 21.00 16.00 5.00 136343 TAP 1994 02 09 03 40 00 6421-66 P co CCGG 212.350 -999.990 ... R4 1994 03 08 13 13 00 36.7300 126.1300 21.00 16.00 5.00 136345 TAP 1994 02 09 03 40 00 6422-66 P co CCGG 214.640 -999.990 ... R4 1994 03 08 13 29 00 36.7300 126.1300 21.00 16.00 5.00 136346 TAP 1994 02 21 03 10 00 6111-66 P co CCGG 241.000 -999.990 ..C R4 1994 04 21 10 08 00 36.7300 126.1300 21.00 16.00 5.00 136347 TAP 1994 02 21 03 10 00 6112-66 P co CCGG 242.540 -999.990 ..C R4 1994 04 21 10 24 00 36.7300 126.1300 21.00 16.00 5.00 136348 TAP 1994 02 25 01 03 00 6799-66 P co CCGG 427.770 -999.990 P.C R4 1994 04 21 09 03 00 36.7300 126.1300 21.00 16.00 5.00 136349 TAP 1994 02 25 01 03 00 6800-66 P co CCGG 432.560 -999.990 P.C R4 1994 04 21 09 19 00 36.7300 126.1300 21.00 16.00 5.00 136350 TAP 1994 03 01 07 48 00 6885-66 P co CCGG 224.280 -999.990 ... R4 1994 04 21 11 17 00 36.7300 126.1300 21.00 16.00 5.00 136351 TAP 1994 03 09 08 16 00 6665-66 P co CCGG 220.030 -999.990 ... R4 1994 04 19 12 51 00 36.7300 126.1300 21.00 16.00 5.00 136352 TAP 1994 03 09 08 16 00 6666-66 P co CCGG 219.130 -999.990 ... R4 1994 04 19 13 07 00 36.7300 126.1300 21.00 16.00 5.00 136353 TAP 1994 03 13 00 25 00 6182-66 P co CCGG 243.710 -999.990 ..C R4 1994 04 21 09 52 00 36.7300 126.1300 21.00 16.00 5.00 136354 TAP 1994 03 23 03 55 00 6827-66 P co CCGG 235.500 -999.990 ..C R4 1994 04 21 10 40 00 36.7300 126.1300 21.00 16.00 5.00 136355 TAP 1994 03 23 03 55 00 6828-66 P co CCGG 235.850 -999.990 ..C R4 1994 04 21 10 56 00 36.7300 126.1300 21.00 16.00 5.00 136356 TAP 1994 04 08 03 04 00 6199-66 P co CCGG 275.270 -999.990 P.C R4 1994 05 27 12 28 00 36.7300 126.1300 21.00 16.00 5.00 136357 TAP 1994 04 08 03 04 00 6200-66 P co CCGG 269.950 -999.990 P.C R4 1994 05 27 12 44 00 36.7300 126.1300 21.00 16.00 5.00 136358 TAP 1994 04 14 03 10 00 6709-66 P co CCGG 267.970 -999.990 ..C R4 1994 05 27 13 00 00 36.7300 126.1300 21.00 16.00 5.00 136359 TAP 1994 04 14 03 10 00 6710-66 P co CCGG 269.460 -999.990 ..C R4 1994 05 27 13 16 00 36.7300 126.1300 21.00 16.00 5.00 136360 TAP 1994 04 26 04 48 00 6339-66 P co CCGG 282.200 -999.990 P.C R4 1994 05 20 08 27 00 36.7300 126.1300 21.00 16.00 5.00 136361 TAP 1994 04 26 04 48 00 6340-66 P co CCGG 278.050 -999.990 P.C R4 1994 05 20 08 43 00 36.7300 126.1300 21.00 16.00 5.00 136362 TAP 1994 05 04 09 48 00 6784-66 P co CCGG 243.800 -999.990 ..C R4 1994 05 23 12 48 00 36.7300 126.1300 21.00 16.00 5.00 136363 TAP 1994 05 07 07 04 00 6213-66 P co CCGG 376.220 -999.990 ..C R4 1994 07 12 12 26 00 36.7300 126.1300 21.00 16.00 5.00 136364 TAP 1994 05 07 07 04 00 6360-66 P co CCGG 378.690 -999.990 ..C R4 1994 07 12 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136365 TAP 1994 05 19 06 55 00 6771-66 P co CCGG 184.880 -999.990 ... R4 1994 07 12 12 58 00 36.7300 126.1300 21.00 16.00 5.00 136366 TAP 1994 05 19 06 55 00 6772-66 P co CCGG 186.140 -999.990 ... R4 1994 07 12 13 14 00 36.7300 126.1300 21.00 16.00 5.00 136367 TAP 1994 05 27 07 36 00 6053-66 P co CCGG 234.170 -999.990 P.C R4 1994 07 12 15 47 00 36.7300 126.1300 21.00 16.00 5.00 136368 TAP 1994 05 27 07 36 00 6054-66 P co CCGG 230.780 -999.990 P.C R4 1994 07 12 16 03 00 36.7300 126.1300 21.00 16.00 5.00 136369 TAP 1994 06 16 04 13 00 6164-66 P co CCGG 293.490 -999.990 ..C R4 1994 07 12 14 26 00 36.7300 126.1300 21.00 16.00 5.00 136370 TAP 1994 06 16 04 13 00 6557-66 P co CCGG 293.050 -999.990 ..C R4 1994 07 12 14 10 00 36.7300 126.1300 21.00 16.00 5.00 136371 TAP 1994 06 20 04 26 00 6067-66 P co CCGG 181.280 -999.990 ... R4 1994 08 30 10 18 00 36.7300 126.1300 21.00 16.00 5.00 136372 TAP 1994 06 20 04 26 00 6068-66 P co CCGG 180.910 -999.990 ... R4 1994 08 30 10 34 00 36.7300 126.1300 21.00 16.00 5.00 136373 TAP 1994 07 13 05 34 00 6403-66 P co CCGG 94.860 -999.990 ... R4 1994 08 30 08 56 00 36.7300 126.1300 21.00 16.00 5.00 136374 TAP 1994 07 13 05 34 00 6404-66 P co CCGG 95.900 -999.990 ... R4 1994 08 30 09 12 00 36.7300 126.1300 21.00 16.00 5.00 136375 TAP 1994 07 20 04 53 00 6691-66 P co CCGG 178.700 -999.990 ... R4 1994 08 30 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136376 TAP 1994 07 20 04 53 00 6692-66 P co CCGG 176.650 -999.990 ... R4 1994 08 30 10 02 00 36.7300 126.1300 21.00 16.00 5.00 136377 TAP 1994 07 29 06 46 00 6345-66 P co CCGG 219.820 -999.990 P.. R4 1994 08 30 11 09 00 36.7300 126.1300 21.00 16.00 5.00 136378 TAP 1994 07 29 06 46 00 6346-66 P co CCGG 206.030 -999.990 P.. R4 1994 08 30 11 25 00 36.7300 126.1300 21.00 16.00 5.00 136379 TAP 1994 08 02 06 26 00 6083-66 P co CCGG 145.180 -999.990 P.. R4 1994 08 29 11 31 00 36.7300 126.1300 21.00 16.00 5.00 136380 TAP 1994 08 02 06 26 00 6084-66 P co CCGG 136.970 -999.990 P.. R4 1994 08 29 11 47 00 36.7300 126.1300 21.00 16.00 5.00 136381 TAP 1994 08 09 05 15 00 6907-66 P co CCGG 146.670 -999.990 P.. R4 1994 08 29 12 03 00 36.7300 126.1300 21.00 16.00 5.00 136382 TAP 1994 08 09 05 15 00 6908-66 P co CCGG 143.410 -999.990 P.. R4 1994 08 29 12 19 00 36.7300 126.1300 21.00 16.00 5.00 136383 TAP 1994 08 19 06 26 00 6619-66 P co CCGG 246.520 -999.990 ..C R4 1994 10 18 09 49 00 36.7300 126.1300 21.00 16.00 5.00 136384 TAP 1994 08 19 06 26 00 6620-66 P co CCGG 248.100 -999.990 ..C R4 1994 10 18 10 05 00 36.7300 126.1300 21.00 16.00 5.00 136385 TAP 1994 09 06 05 12 00 6863-66 P co CCGG 231.400 -999.990 ..C R4 1994 10 18 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136386 TAP 1994 09 06 05 12 00 6864-66 P co CCGG 230.410 -999.990 ..C R4 1994 10 18 10 38 00 36.7300 126.1300 21.00 16.00 5.00 136387 TAP 1994 09 12 04 26 00 6427-66 P co CCGG 184.080 -999.990 ... R4 1994 10 13 08 40 00 36.7300 126.1300 21.00 16.00 5.00 136388 TAP 1994 09 12 04 26 00 6428-66 P co CCGG 183.940 -999.990 ... R4 1994 10 13 08 56 00 36.7300 126.1300 21.00 16.00 5.00 136389 TAP 1994 09 17 04 30 00 6015-66 P co CCGG 232.880 -999.990 ..C R4 1994 10 13 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136390 TAP 1994 09 17 04 30 00 6016-66 P co CCGG 231.420 -999.990 ..C R4 1994 10 13 10 02 00 36.7300 126.1300 21.00 16.00 5.00 136391 TAP 1994 09 30 05 18 00 6779-66 P co CCGG 182.640 -999.990 ... R4 1994 12 15 11 27 00 36.7300 126.1300 21.00 16.00 5.00 136392 TAP 1994 09 30 05 18 00 6780-66 P co CCGG 179.990 -999.990 ... R4 1994 12 15 11 43 00 36.7300 126.1300 21.00 16.00 5.00 136393 TAP 1994 10 05 04 20 00 6355-66 P co CCGG 197.300 -999.990 ... R4 1994 12 15 09 50 00 36.7300 126.1300 21.00 16.00 5.00 136394 TAP 1994 10 05 04 20 00 6794-66 P co CCGG 199.090 -999.990 ... R4 1994 12 15 10 06 00 36.7300 126.1300 21.00 16.00 5.00 136395 TAP 1994 10 13 04 07 00 6797-66 P co CCGG 437.770 -999.990 .XC R4 1994 12 15 10 22 00 36.7300 126.1300 21.00 16.00 5.00 136396 TAP 1994 10 13 04 07 00 6798-66 P co CCGG 436.740 -999.990 .XC R4 1994 12 15 10 38 00 36.7300 126.1300 21.00 16.00 5.00 136397 TAP 1994 10 27 05 03 00 6719-66 P co CCGG 283.620 -999.990 ..C R4 1994 12 15 10 54 00 36.7300 126.1300 21.00 16.00 5.00 136398 TAP 1994 10 27 05 03 00 6720-66 P co CCGG 283.290 -999.990 ..C R4 1994 12 15 11 11 00 36.7300 126.1300 21.00 16.00 5.00 136399 TAP 1994 10 31 08 04 00 6759-66 P co CCGG 166.050 -999.990 ... R4 1994 12 14 14 00 00 36.7300 126.1300 21.00 16.00 5.00 136400 TAP 1994 10 31 08 04 00 6760-66 P co CCGG 166.320 -999.990 ... R4 1994 12 14 14 16 00 36.7300 126.1300 21.00 16.00 5.00 136401 TAP 1994 11 03 00 50 00 6155-66 P co CCGG 445.210 -999.990 .XC R4 1994 12 14 12 21 00 36.7300 126.1300 21.00 16.00 5.00 136402 TAP 1994 11 03 00 50 00 6156-66 P co CCGG 444.790 -999.990 .XC R4 1994 12 14 12 37 00 36.7300 126.1300 21.00 16.00 5.00 136403 TAP 1994 11 19 06 50 00 6787-66 P co CCGG 378.660 -999.990 P.C R4 1994 12 15 09 10 00 36.7300 126.1300 21.00 16.00 5.00 136404 TAP 1994 11 19 06 50 00 6788-66 P co CCGG 376.360 -999.990 P.C R4 1994 12 15 09 26 00 36.7300 126.1300 21.00 16.00 5.00 136405 TAP 1994 12 02 03 00 00 6747-66 P co CCGG 198.870 -999.990 ... R4 1995 01 31 10 01 00 36.7300 126.1300 21.00 16.00 5.00 136406 TAP 1994 12 02 03 00 00 6748-66 P co CCGG 197.060 -999.990 ... R4 1995 01 31 10 17 00 36.7300 126.1300 21.00 16.00 5.00 136407 TAP 1994 12 18 07 05 00 6085-66 P co CCGG 259.490 -999.990 P.C R4 1995 01 31 08 24 00 36.7300 126.1300 21.00 16.00 5.00 136408 TAP 1994 12 18 07 05 00 6086-66 P co CCGG 256.090 -999.990 P.C R4 1995 01 31 08 41 00 36.7300 126.1300 21.00 16.00 5.00 136409 TAP 1994 12 31 00 48 00 6689-66 P co CCGG 233.180 -999.990 ..C R4 1995 01 31 11 09 00 36.7300 126.1300 21.00 16.00 5.00 136410 TAP 1994 12 31 00 48 00 6690-66 P co CCGG 232.290 -999.990 ..C R4 1995 01 31 11 25 00 36.7300 126.1300 21.00 16.00 5.00 136411 TAP 1995 01 06 01 02 00 6421-66 P co CCGG 220.920 -999.990 ... R4 1995 01 31 10 37 00 36.7300 126.1300 21.00 16.00 5.00 136412 TAP 1995 01 06 01 02 00 6422-66 P co CCGG 221.790 -999.990 ... R4 1995 01 31 10 53 00 36.7300 126.1300 21.00 16.00 5.00 136413 TAP 1995 01 10 02 25 00 6313-66 P co CCGG 214.240 -999.990 ... R4 1995 01 30 16 10 00 36.7300 126.1300 21.00 16.00 5.00 136414 TAP 1995 01 10 02 25 00 6314-66 P co CCGG 212.740 -999.990 ... R4 1995 01 30 16 27 00 36.7300 126.1300 21.00 16.00 5.00 136415 TAP 1995 01 15 04 10 00 6189-66 P co CCGG 220.360 -999.990 ... R4 1995 01 30 15 38 00 36.7300 126.1300 21.00 16.00 5.00 136416 TAP 1995 01 15 04 10 00 6691-66 P co CCGG 220.560 -999.990 ... R4 1995 01 30 15 54 00 36.7300 126.1300 21.00 16.00 5.00 136417 TAP 1995 01 24 00 38 00 6190-66 P co CCGG 239.470 -999.990 ..C R4 1995 04 18 11 20 00 36.7300 126.1300 21.00 16.00 5.00 136418 TAP 1995 01 24 00 38 00 6692-66 P co CCGG 238.820 -999.990 ..C R4 1995 04 18 11 36 00 36.7300 126.1300 21.00 16.00 5.00 136419 TAP 1995 02 06 06 20 00 6593-66 P co CCGG 322.150 -999.990 P.C R4 1995 04 18 15 24 00 36.7300 126.1300 21.00 16.00 5.00 136420 TAP 1995 02 06 06 20 00 6594-66 P co CCGG 333.350 -999.990 P.C R4 1995 04 18 15 40 00 36.7300 126.1300 21.00 16.00 5.00 136421 TAP 1995 02 17 07 08 00 6623-66 P co CCGG 242.950 -999.990 ..C R4 1995 04 17 13 28 00 36.7300 126.1300 21.00 16.00 5.00 136422 TAP 1995 02 17 07 08 00 6624-66 P co CCGG 243.750 -999.990 ..C R4 1995 04 17 13 44 00 36.7300 126.1300 21.00 16.00 5.00 136423 TAP 1995 02 21 06 17 00 6729-66 P co CCGG 286.810 -999.990 ..C R4 1995 04 17 15 04 00 36.7300 126.1300 21.00 16.00 5.00 136424 TAP 1995 02 21 06 17 00 6730-66 P co CCGG 287.700 -999.990 ..C R4 1995 04 17 15 20 00 36.7300 126.1300 21.00 16.00 5.00 136425 TAP 1995 03 10 05 20 00 6895-66 P co CCGG 218.310 -999.990 ... R4 1995 04 17 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136426 TAP 1995 03 10 05 20 00 6896-66 P co CCGG 216.810 -999.990 ... R4 1995 04 17 14 48 00 36.7300 126.1300 21.00 16.00 5.00 136427 TAP 1995 03 17 08 08 00 6469-66 P co CCGG 199.360 -999.990 ... R4 1995 04 17 14 00 00 36.7300 126.1300 21.00 16.00 5.00 136428 TAP 1995 03 17 08 08 00 6470-66 P co CCGG 198.670 -999.990 ... R4 1995 04 17 14 16 00 36.7300 126.1300 21.00 16.00 5.00 136429 TAP 1995 04 01 06 02 00 6001-66 P co CCGG 220.450 -999.990 ... R4 1995 05 15 13 30 00 36.7300 126.1300 21.00 16.00 5.00 136430 TAP 1995 04 01 06 02 00 6002-66 P co CCGG 219.210 -999.990 ... R4 1995 05 15 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136431 TAP 1995 04 10 08 05 00 6113-66 P co CCGG 226.380 -999.990 ... R4 1995 05 15 10 57 00 36.7300 126.1300 21.00 16.00 5.00 136432 TAP 1995 04 10 08 05 00 6114-66 P co CCGG 226.930 -999.990 ... R4 1995 05 15 11 13 00 36.7300 126.1300 21.00 16.00 5.00 136433 TAP 1995 04 18 05 25 00 6199-66 P co CCGG 417.090 -999.990 .XC R4 1995 05 12 15 59 00 36.7300 126.1300 21.00 16.00 5.00 136434 TAP 1995 04 18 05 25 00 6200-66 P co CCGG 415.330 -999.990 .XC R4 1995 05 12 16 15 00 36.7300 126.1300 21.00 16.00 5.00 136435 TAP 1995 04 19 05 57 00 6653-66 P co CCGG 279.620 -999.990 ..C R4 1995 05 15 09 17 00 36.7300 126.1300 21.00 16.00 5.00 136436 TAP 1995 04 19 05 57 00 6654-66 P co CCGG 277.870 -999.990 ..C R4 1995 05 15 09 33 00 36.7300 126.1300 21.00 16.00 5.00 136437 TAP 1995 05 04 07 45 00 6759-66 P co CCGG 208.680 -999.990 ... R4 1995 06 21 15 45 00 36.7300 126.1300 21.00 16.00 5.00 136438 TAP 1995 05 04 07 45 00 6760-66 P co CCGG 206.660 -999.990 ... R4 1995 06 21 16 01 00 36.7300 126.1300 21.00 16.00 5.00 136439 TAP 1995 05 11 06 34 00 6459-66 P co CCGG 184.630 -999.990 ... R4 1995 06 21 17 09 00 36.7300 126.1300 21.00 16.00 5.00 136440 TAP 1995 05 11 06 34 00 6460-66 P co CCGG 185.460 -999.990 ... R4 1995 06 21 17 25 00 36.7300 126.1300 21.00 16.00 5.00 136441 TAP 1995 05 16 08 00 00 6021-66 P co CCGG 331.920 -999.990 ..C R4 1995 06 22 12 46 00 36.7300 126.1300 21.00 16.00 5.00 136442 TAP 1995 05 16 08 00 00 6168-66 P co CCGG 333.940 -999.990 ..C R4 1995 06 22 13 02 00 36.7300 126.1300 21.00 16.00 5.00 136443 TAP 1995 05 26 07 33 00 6090-66 P co CCGG 231.300 -999.990 ..C R4 1995 06 22 13 34 00 36.7300 126.1300 21.00 16.00 5.00 136444 TAP 1995 05 26 07 33 00 6167-66 P co CCGG 232.050 -999.990 ..C R4 1995 06 22 13 18 00 36.7300 126.1300 21.00 16.00 5.00 136445 TAP 1995 06 19 06 14 00 1337-91 P co CCGG 259.920 -999.990 P.C R7 1995 08 23 14 16 00 36.7300 126.1300 21.00 16.00 5.00 136446 TAP 1995 06 19 06 14 00 1338-91 P co CCGG 232.880 -999.990 P.C R7 1995 08 23 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136447 TAP 1995 06 26 07 45 00 1339-91 P co CCGG 209.850 -999.990 ... R7 1995 08 23 13 13 00 36.7300 126.1300 21.00 16.00 5.00 136448 TAP 1995 06 26 07 45 00 1340-91 P co CCGG 207.090 -999.990 ... R7 1995 08 23 13 29 00 36.7300 126.1300 21.00 16.00 5.00 136449 TAP 1995 07 22 06 40 00 6539-66 P co CCGG 242.870 -999.990 ..C R7 1995 08 23 13 45 00 36.7300 126.1300 21.00 16.00 5.00 136450 TAP 1995 07 22 06 40 00 6540-66 P co CCGG 241.430 -999.990 ..C R7 1995 08 23 14 00 00 36.7300 126.1300 21.00 16.00 5.00 136451 TAP 1995 07 25 04 30 00 6899-66 P co CCGG 104.990 -999.990 ... R7 1995 08 23 15 48 00 36.7300 126.1300 21.00 16.00 5.00 136452 TAP 1995 07 25 04 30 00 6900-66 P co CCGG 104.280 -999.990 ... R7 1995 08 23 16 04 00 36.7300 126.1300 21.00 16.00 5.00 136453 TAP 1995 08 07 07 15 00 6319-66 P co CCGG 92.920 -999.990 P.. R7 1995 08 23 10 11 00 36.7300 126.1300 21.00 16.00 5.00 136454 TAP 1995 08 07 07 15 00 6320-66 P co CCGG 73.770 -999.990 P.. R7 1995 08 23 10 27 00 36.7300 126.1300 21.00 16.00 5.00 136455 TAP 1995 08 14 07 00 00 6587-66 P co CCGG 137.940 -999.990 P.. R7 1995 10 20 15 28 00 36.7300 126.1300 21.00 16.00 5.00 136456 TAP 1995 08 14 07 00 00 6588-66 P co CCGG 121.450 -999.990 P.. R7 1995 10 20 15 44 00 36.7300 126.1300 21.00 16.00 5.00 136457 TAP 1995 09 12 07 08 00 671-91 P co CCGG 158.620 -999.990 ... R7 1995 10 20 13 50 00 36.7300 126.1300 21.00 16.00 5.00 136458 TAP 1995 09 12 07 08 00 672-91 P co CCGG 157.350 -999.990 ... R7 1995 10 20 14 06 00 36.7300 126.1300 21.00 16.00 5.00 136459 TAP 1995 09 27 07 05 00 77-91 P co CCGG 152.700 -999.990 ... R7 1995 10 20 12 38 00 36.7300 126.1300 21.00 16.00 5.00 136460 TAP 1995 09 27 07 05 00 78-91 P co CCGG 149.880 -999.990 ... R7 1995 10 20 12 54 00 36.7300 126.1300 21.00 16.00 5.00 136461 TAP 1995 10 05 07 03 00 772-91 P co CCGG 140.630 -999.990 ... R7 1995 11 20 13 41 00 36.7300 126.1300 21.00 16.00 5.00 136462 TAP 1995 10 06 07 07 00 469-91 P co CCGG 146.200 -999.990 ... R7 1995 10 20 14 22 00 36.7300 126.1300 21.00 16.00 5.00 136463 TAP 1995 10 06 07 07 00 470-91 P co CCGG 144.420 -999.990 ... R7 1995 10 20 14 38 00 36.7300 126.1300 21.00 16.00 5.00 136464 TAP 1995 10 30 06 03 00 717-91 P co CCGG 151.100 -999.990 ... R7 1995 11 15 19 06 00 36.7300 126.1300 21.00 16.00 5.00 136465 TAP 1995 10 30 06 03 00 718-91 P co CCGG 149.780 -999.990 ... R7 1995 11 15 19 22 00 36.7300 126.1300 21.00 16.00 5.00 136466 TAP 1995 11 08 06 17 00 1510-91 P co CCGG 147.080 -999.990 ... R7 1995 12 11 11 37 00 36.7300 126.1300 21.00 16.00 5.00 136467 TAP 1995 11 17 06 31 00 1511-91 P co CCGG 295.520 -999.990 ..C R7 1995 12 11 10 49 00 36.7300 126.1300 21.00 16.00 5.00 136468 TAP 1995 11 17 06 31 00 1512-91 P co CCGG 295.780 -999.990 ..C R7 1995 12 11 11 05 00 36.7300 126.1300 21.00 16.00 5.00 136469 TAP 1995 11 20 07 37 00 6311-66 P co CCGG 185.730 -999.990 ... R7 1995 12 11 14 28 00 36.7300 126.1300 21.00 16.00 5.00 136470 TAP 1995 11 20 07 37 00 6312-66 P co CCGG 184.410 -999.990 ... R7 1995 12 11 14 44 00 36.7300 126.1300 21.00 16.00 5.00 136471 TAP 1995 11 24 06 06 00 6901-66 P co CCGG 232.240 -999.990 ..C R7 1995 12 11 16 05 00 36.7300 126.1300 21.00 16.00 5.00 136472 TAP 1995 11 24 06 06 00 6902-66 P co CCGG 232.070 -999.990 ..C R7 1995 12 11 16 21 00 36.7300 126.1300 21.00 16.00 5.00 136473 TAP 1995 12 05 06 40 00 603-91 P co CCGG 214.120 -999.990 P.. R7 1996 01 11 16 43 00 36.7300 126.1300 21.00 16.00 5.00 136474 TAP 1995 12 05 06 40 00 604-91 P co CCGG 210.540 -999.990 P.. R7 1996 01 11 16 59 00 36.7300 126.1300 21.00 16.00 5.00 136475 TAP 1995 12 16 07 43 00 343-91 P co CCGG 198.120 -999.990 ... R7 1996 01 11 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136476 TAP 1995 12 16 07 43 00 344-91 P co CCGG 197.420 -999.990 ... R7 1996 01 11 13 38 00 36.7300 126.1300 21.00 16.00 5.00 136477 TAP 1995 12 21 07 07 00 456-91 P co CCGG 320.960 -999.990 ..C R7 1996 02 02 12 05 00 36.7300 126.1300 21.00 16.00 5.00 136478 TAP 1996 01 03 06 42 00 594-91 P co CCGG 219.330 -999.990 ... R7 1996 02 02 16 27 00 36.7300 126.1300 21.00 16.00 5.00 136479 TAP 1996 01 08 06 05 00 1371-91 P co CCGG 231.430 -999.990 P.C R7 1996 02 12 18 02 00 36.7300 126.1300 21.00 16.00 5.00 136480 TAP 1996 01 08 06 05 00 1372-91 P co CCGG 174.260 -999.990 P.. R7 1996 02 12 18 18 00 36.7300 126.1300 21.00 16.00 5.00 136481 TAP 1996 01 20 06 21 00 1373-91 P co CCGG 260.770 -999.990 ..C R7 1996 02 12 17 29 00 36.7300 126.1300 21.00 16.00 5.00 136482 TAP 1996 01 20 06 21 00 1374-91 P co CCGG 259.200 -999.990 ..C R7 1996 02 12 17 45 00 36.7300 126.1300 21.00 16.00 5.00 136483 TAP 1996 01 23 06 03 00 835-91 P co CCGG 201.330 -999.990 ... R7 1996 02 29 14 06 00 36.7300 126.1300 21.00 16.00 5.00 136484 TAP 1996 01 23 06 03 00 836-91 P co CCGG 201.590 -999.990 ... R7 1996 02 29 14 22 00 36.7300 126.1300 21.00 16.00 5.00 136485 TAP 1996 02 02 07 28 00 57-91 P co CCGG 208.930 -999.990 ... R7 1996 02 29 12 53 00 36.7300 126.1300 21.00 16.00 5.00 136486 TAP 1996 02 02 07 28 00 58-91 P co CCGG 209.350 -999.990 ... R7 1996 02 29 13 09 00 36.7300 126.1300 21.00 16.00 5.00 136487 TAP 1996 02 06 06 35 00 1263-91 P co CCGG 310.290 -999.990 ..C R7 1996 03 13 09 25 00 36.7300 126.1300 21.00 16.00 5.00 136488 TAP 1996 02 06 06 35 00 1264-91 P co CCGG 309.990 -999.990 ..C R7 1996 03 13 09 41 00 36.7300 126.1300 21.00 16.00 5.00 136489 TAP 1996 02 09 06 27 00 131-91 P co CCGG 281.880 -999.990 ..C R7 1996 03 13 08 53 00 36.7300 126.1300 21.00 16.00 5.00 136490 TAP 1996 02 09 06 27 00 132-91 P co CCGG 279.530 -999.990 ..C R7 1996 03 13 09 09 00 36.7300 126.1300 21.00 16.00 5.00 136491 TAP 1996 02 15 06 21 00 469-91 P co CCGG 213.830 -999.990 ... R7 1996 03 18 15 19 00 36.7300 126.1300 21.00 16.00 5.00 136492 TAP 1996 02 15 06 21 00 470-91 P co CCGG 213.190 -999.990 ... R7 1996 03 18 15 35 00 36.7300 126.1300 21.00 16.00 5.00 136493 TAP 1996 02 23 06 17 00 1429-91 P co CCGG 247.670 -999.990 ..C R7 1996 03 20 12 59 00 36.7300 126.1300 21.00 16.00 5.00 136494 TAP 1996 02 23 06 17 00 1430-91 P co CCGG 246.430 -999.990 ..C R7 1996 03 20 13 15 00 36.7300 126.1300 21.00 16.00 5.00 136495 TAP 1996 03 01 06 35 00 859-91 P co CCGG 194.420 -999.990 ... R7 1996 03 28 13 06 00 36.7300 126.1300 21.00 16.00 5.00 136496 TAP 1996 03 01 06 35 00 860-91 P co CCGG 194.370 -999.990 ... R7 1996 03 28 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136497 TAP 1996 03 09 05 40 00 167-91 P co CCGG 295.120 -999.990 ..C R7 1996 03 28 14 43 00 36.7300 126.1300 21.00 16.00 5.00 136498 TAP 1996 03 09 05 40 00 168-91 P co CCGG 295.120 -999.990 ..C R7 1996 03 28 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136499 TAP 1996 03 19 07 27 00 545-91 P co CCGG 203.350 -999.990 ... R7 1996 04 16 11 17 00 36.7300 126.1300 21.00 16.00 5.00 136500 TAP 1996 04 01 07 47 00 693-91 P co CCGG 179.750 -999.990 ... R7 1996 04 16 11 33 00 36.7300 126.1300 21.00 16.00 5.00 136501 TAP 1996 04 12 07 17 00 853-91 P co CCGG 240.030 -999.990 ..C R7 1996 05 16 14 43 00 36.7300 126.1300 21.00 16.00 5.00 136502 TAP 1996 04 12 07 17 00 854-91 P co CCGG 242.330 -999.990 ..C R7 1996 05 16 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136503 TAP 1996 04 18 06 47 00 654-91 P co CCGG 315.410 -999.990 ..C R7 1996 05 16 15 15 00 36.7300 126.1300 21.00 16.00 5.00 136504 TAP 1996 05 21 07 47 00 541-91 P co CCGG 355.260 -999.990 ..C R7 1996 06 19 12 34 00 36.7300 126.1300 21.00 16.00 5.00 136505 TAP 1996 05 21 07 47 00 542-91 P co CCGG 351.580 -999.990 ..C R7 1996 06 19 12 50 00 36.7300 126.1300 21.00 16.00 5.00 136506 TAP 1996 05 29 07 38 00 981-91 P co CCGG 244.450 -999.990 ..C R7 1996 06 19 11 30 00 36.7300 126.1300 21.00 16.00 5.00 136507 TAP 1996 05 29 07 38 00 982-91 P co CCGG 245.610 -999.990 ..C R7 1996 06 19 11 46 00 36.7300 126.1300 21.00 16.00 5.00 136508 TAP 1996 06 25 06 37 00 1336-91 P co CCGG 201.270 -999.990 ... R7 1996 07 19 16 41 00 36.7300 126.1300 21.00 16.00 5.00 136509 TAP 1996 06 30 06 20 00 841-91 P co CCGG 370.300 -999.990 ..C R7 1996 07 19 15 52 00 36.7300 126.1300 21.00 16.00 5.00 136510 TAP 1996 06 30 06 20 00 842-91 P co CCGG 367.910 -999.990 ..C R7 1996 07 19 16 08 00 36.7300 126.1300 21.00 16.00 5.00 136511 TAP 1996 07 05 08 20 00 6591-66 P co CCGG 175.730 -999.990 ... R7 1996 08 09 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136512 TAP 1996 07 05 08 20 00 6592-66 P co CCGG 175.570 -999.990 ... R7 1996 08 09 10 37 00 36.7300 126.1300 21.00 16.00 5.00 136513 TAP 1996 07 23 06 32 00 527-91 P co CCGG 259.860 -999.990 ..C R7 1996 08 09 11 25 00 36.7300 126.1300 21.00 16.00 5.00 136514 TAP 1996 07 23 06 32 00 528-91 P co CCGG 259.120 -999.990 ..C R7 1996 08 09 11 41 00 36.7300 126.1300 21.00 16.00 5.00 136515 TAP 1996 07 29 05 39 00 1215-91 P co CCGG 82.160 -999.990 P.. R7 1996 09 18 13 10 00 36.7300 126.1300 21.00 16.00 5.00 136516 TAP 1996 07 29 05 39 00 1216-91 P co CCGG 119.200 -999.990 P.. R7 1996 09 18 13 27 00 36.7300 126.1300 21.00 16.00 5.00 136517 TAP 1996 08 12 05 40 00 125-91 P co CCGG 262.550 -999.990 P.C R7 1996 09 18 14 47 00 36.7300 126.1300 21.00 16.00 5.00 136518 TAP 1996 08 12 05 40 00 1787-91 P co CCGG 242.900 -999.990 P.C R7 1996 09 18 15 03 00 36.7300 126.1300 21.00 16.00 5.00 136519 TAP 1996 08 18 07 28 00 1167-91 P co CCGG 106.070 -999.990 P.. R7 1996 09 18 14 15 00 36.7300 126.1300 21.00 16.00 5.00 136520 TAP 1996 08 18 07 28 00 1168-91 P co CCGG 103.050 -999.990 P.. R7 1996 09 18 14 31 00 36.7300 126.1300 21.00 16.00 5.00 136521 TAP 1996 08 23 07 15 00 1975-91 P co CCGG 240.110 -999.990 ..C R7 1996 09 18 13 43 00 36.7300 126.1300 21.00 16.00 5.00 136522 TAP 1996 08 23 07 15 00 1976-91 P co CCGG 237.830 -999.990 ..C R7 1996 09 18 13 59 00 36.7300 126.1300 21.00 16.00 5.00 136523 TAP 1996 08 29 07 10 00 2079-91 P co CCGG 385.390 -999.990 .XC R7 1996 10 01 14 09 00 36.7300 126.1300 21.00 16.00 5.00 136524 TAP 1996 08 29 07 10 00 2080-91 P co CCGG 381.420 -999.990 .XC R7 1996 10 01 14 25 00 36.7300 126.1300 21.00 16.00 5.00 136525 TAP 1996 09 17 06 20 00 1813-91 P co CCGG 210.250 -999.990 ... R7 1996 10 01 14 41 00 36.7300 126.1300 21.00 16.00 5.00 136526 TAP 1996 09 17 06 20 00 1814-91 P co CCGG 207.650 -999.990 ... R7 1996 10 01 14 57 00 36.7300 126.1300 21.00 16.00 5.00 136527 TAP 1996 09 20 06 20 00 1473-91 P co CCGG 154.930 -999.990 ... R7 1996 11 07 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136528 TAP 1996 09 20 06 20 00 1474-91 P co CCGG 153.620 -999.990 ... R7 1996 11 07 10 37 00 36.7300 126.1300 21.00 16.00 5.00 136529 TAP 1996 10 15 06 15 00 1131-91 P co CCGG 168.660 -999.990 ... R7 1996 11 07 09 49 00 36.7300 126.1300 21.00 16.00 5.00 136530 TAP 1996 10 15 06 15 00 1132-91 P co CCGG 169.060 -999.990 ... R7 1996 11 07 10 05 00 36.7300 126.1300 21.00 16.00 5.00 136531 TAP 1996 10 25 05 40 00 589-91 P co CCGG 253.850 -999.990 ..C R7 1996 11 27 16 15 00 36.7300 126.1300 21.00 16.00 5.00 136532 TAP 1996 10 25 05 40 00 590-91 P co CCGG 251.810 -999.990 ..C R7 1996 11 27 16 31 00 36.7300 126.1300 21.00 16.00 5.00 136533 TAP 1996 11 02 06 20 00 537-91 P co CCGG 162.940 -999.990 ... R7 1996 11 27 15 43 00 36.7300 126.1300 21.00 16.00 5.00 136534 TAP 1996 11 02 06 20 00 538-91 P co CCGG 161.390 -999.990 ... R7 1996 11 27 15 59 00 36.7300 126.1300 21.00 16.00 5.00 136535 TAP 1996 11 06 05 20 00 523-91 P co CCGG 199.440 -999.990 ... R7 1996 11 29 08 25 00 36.7300 126.1300 21.00 16.00 5.00 136536 TAP 1996 11 06 05 20 00 524-91 P co CCGG 199.840 -999.990 ... R7 1996 11 29 08 41 00 36.7300 126.1300 21.00 16.00 5.00 136537 TAP 1996 11 12 05 11 00 441-91 P co CCGG 216.430 -999.990 P.. R7 1996 11 29 10 02 00 36.7300 126.1300 21.00 16.00 5.00 136538 TAP 1996 11 12 05 11 00 442-91 P co CCGG 220.710 -999.990 P.. R7 1996 11 29 10 19 00 36.7300 126.1300 21.00 16.00 5.00 136539 TAP 1996 11 19 06 07 00 843-91 P co CCGG 190.570 -999.990 ... R7 1997 01 02 12 26 00 36.7300 126.1300 21.00 16.00 5.00 136540 TAP 1996 11 19 06 07 00 844-91 P co CCGG 188.830 -999.990 ... R7 1997 01 02 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136541 TAP 1996 11 29 05 54 00 1057-91 P co CCGG 221.850 -999.990 ... R7 1997 01 02 13 30 00 36.7300 126.1300 21.00 16.00 5.00 136542 TAP 1996 11 29 05 54 00 1058-91 P co CCGG 221.100 -999.990 ... R7 1997 01 02 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136543 TAP 1996 12 18 05 05 00 173-91 P co CCGG 178.990 -999.990 ... R7 1997 01 14 12 10 00 36.7300 126.1300 21.00 16.00 5.00 136544 TAP 1996 12 18 05 05 00 174-91 P co CCGG 176.690 -999.990 ... R7 1997 01 14 12 26 00 36.7300 126.1300 21.00 16.00 5.00 136545 TAP 1996 12 23 05 45 00 1169-91 P co CCGG 201.710 -999.990 ... R7 1997 01 14 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136546 TAP 1996 12 23 05 45 00 1170-91 P co CCGG 199.650 -999.990 ... R7 1997 01 14 12 58 00 36.7300 126.1300 21.00 16.00 5.00 136547 TAP 1997 01 03 06 35 00 1803-91 P co CCGG 180.390 -999.990 ... R7 1997 02 06 10 05 00 36.7300 126.1300 21.00 16.00 5.00 136548 TAP 1997 01 03 06 35 00 1804-91 P co CCGG 179.500 -999.990 ... R7 1997 02 06 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136549 TAP 1997 01 16 07 00 00 575-91 P co CCGG 193.900 -999.990 ... R7 1997 02 06 08 22 00 36.7300 126.1300 21.00 16.00 5.00 136550 TAP 1997 01 16 07 00 00 576-91 P co CCGG 193.210 -999.990 ... R7 1997 02 06 08 38 00 36.7300 126.1300 21.00 16.00 5.00 136551 TAP 1997 01 18 06 20 00 689-91 P co CCGG 206.700 -999.990 P.. R7 1997 02 14 09 28 00 36.7300 126.1300 21.00 16.00 5.00 136552 TAP 1997 01 18 06 20 00 690-91 P co CCGG 202.730 -999.990 P.. R7 1997 02 14 09 44 00 36.7300 126.1300 21.00 16.00 5.00 136553 TAP 1997 01 21 06 45 00 4155-91 P co CCGG 205.900 -999.990 ... R7 1997 02 14 08 57 00 36.7300 126.1300 21.00 16.00 5.00 136554 TAP 1997 01 21 06 45 00 4156-91 P co CCGG 207.220 -999.990 ... R7 1997 02 14 09 13 00 36.7300 126.1300 21.00 16.00 5.00 136555 TAP 1997 01 24 06 45 00 1729-91 P co CCGG 233.220 -999.990 ..C R7 1997 02 26 09 08 00 36.7300 126.1300 21.00 16.00 5.00 136556 TAP 1997 01 24 06 45 00 1730-91 P co CCGG 230.220 -999.990 ..C R7 1997 02 26 09 24 00 36.7300 126.1300 21.00 16.00 5.00 136557 TAP 1997 01 29 06 45 00 182-91 P co CCGG 230.450 -999.990 ..C R7 1997 02 26 08 52 00 36.7300 126.1300 21.00 16.00 5.00 136558 TAP 1997 02 06 06 40 00 1179-91 P co CCGG 280.340 -999.990 ..C R7 1997 03 05 09 18 00 36.7300 126.1300 21.00 16.00 5.00 136559 TAP 1997 02 06 06 40 00 1180-91 P co CCGG 277.560 -999.990 ..C R7 1997 03 05 09 34 00 36.7300 126.1300 21.00 16.00 5.00 136560 TAP 1997 02 11 06 35 00 515-91 P co CCGG 220.300 -999.990 ... R7 1997 03 05 08 46 00 36.7300 126.1300 21.00 16.00 5.00 136561 TAP 1997 02 11 06 35 00 516-91 P co CCGG 221.400 -999.990 ... R7 1997 03 05 09 02 00 36.7300 126.1300 21.00 16.00 5.00 136562 TAP 1997 02 14 00 17 00 1359-91 P co CCGG 153.020 -999.990 ... R7 1997 03 12 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136563 TAP 1997 02 14 00 17 00 1360-91 P co CCGG 153.190 -999.990 ... R7 1997 03 12 12 31 00 36.7300 126.1300 21.00 16.00 5.00 136564 TAP 1997 02 17 06 20 00 4243-91 P co CCGG 241.670 -999.990 ..C R7 1997 03 14 09 13 00 36.7300 126.1300 21.00 16.00 5.00 136565 TAP 1997 02 17 06 20 00 4244-91 P co CCGG 240.990 -999.990 ..C R7 1997 03 14 09 29 00 36.7300 126.1300 21.00 16.00 5.00 136566 TAP 1997 02 21 00 05 00 267-91 P co CCGG 153.580 -999.990 ... R7 1997 03 12 13 35 00 36.7300 126.1300 21.00 16.00 5.00 136567 TAP 1997 02 21 00 05 00 268-91 P co CCGG 151.540 -999.990 ... R7 1997 03 12 13 51 00 36.7300 126.1300 21.00 16.00 5.00 136568 TAP 1997 02 26 06 30 00 4253-91 P co CCGG 357.160 -999.990 ..C R7 1997 03 14 09 45 00 36.7300 126.1300 21.00 16.00 5.00 136569 TAP 1997 02 26 06 30 00 4254-91 P co CCGG 357.100 -999.990 ..C R7 1997 03 14 10 01 00 36.7300 126.1300 21.00 16.00 5.00 136570 TAP 1997 03 07 06 25 00 4009-91 P co CCGG 246.030 -999.990 ..C R7 1997 04 07 14 33 00 36.7300 126.1300 21.00 16.00 5.00 136571 TAP 1997 03 07 06 25 00 4010-91 P co CCGG 244.640 -999.990 ..C R7 1997 04 07 14 49 00 36.7300 126.1300 21.00 16.00 5.00 136572 TAP 1997 03 17 06 30 00 1559-91 P co CCGG 233.770 -999.990 ..C R7 1997 04 07 14 01 00 36.7300 126.1300 21.00 16.00 5.00 136573 TAP 1997 03 17 06 30 00 1560-91 P co CCGG 233.690 -999.990 ..C R7 1997 04 07 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136574 TAP 1997 03 24 06 46 00 4179-91 P co CCGG 265.330 -999.990 P.C R7 1997 04 16 15 07 00 36.7300 126.1300 21.00 16.00 5.00 136575 TAP 1997 03 24 06 46 00 4180-91 P co CCGG 269.670 -999.990 P.C R7 1997 04 16 15 23 00 36.7300 126.1300 21.00 16.00 5.00 136576 TAP 1997 03 29 06 15 00 1519-91 P co CCGG 266.740 -999.990 ..C R7 1997 04 16 15 39 00 36.7300 126.1300 21.00 16.00 5.00 136577 TAP 1997 03 29 06 15 00 1520-91 P co CCGG 264.760 -999.990 ..C R7 1997 04 16 15 55 00 36.7300 126.1300 21.00 16.00 5.00 136578 TAP 1997 04 03 06 35 00 1784-91 P co CCGG 339.900 -999.990 ..C R7 1997 05 08 10 09 00 36.7300 126.1300 21.00 16.00 5.00 136579 TAP 1997 04 03 06 35 00 4183-91 P co CCGG 337.130 -999.990 ..C R7 1997 05 08 09 53 00 36.7300 126.1300 21.00 16.00 5.00 136580 TAP 1997 04 09 06 10 00 1863-91 P co CCGG 241.020 -999.990 ..C R7 1997 05 08 09 21 00 36.7300 126.1300 21.00 16.00 5.00 136581 TAP 1997 04 09 06 10 00 1864-91 P co CCGG 241.810 -999.990 ..C R7 1997 05 08 09 37 00 36.7300 126.1300 21.00 16.00 5.00 136582 TAP 1997 04 18 06 35 00 259-91 P co CCGG 326.810 -999.990 ..C R7 1997 05 12 13 30 00 36.7300 126.1300 21.00 16.00 5.00 136583 TAP 1997 04 18 06 35 00 260-91 P co CCGG 327.240 -999.990 ..C R7 1997 05 12 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136584 TAP 1997 04 22 06 10 00 1703-91 P co CCGG 257.650 -999.990 ..C R7 1997 05 12 12 26 00 36.7300 126.1300 21.00 16.00 5.00 136585 TAP 1997 04 22 06 10 00 1704-91 P co CCGG 258.140 -999.990 ..C R7 1997 05 12 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136586 TAP 1997 05 02 06 45 00 4271-91 P co CCGG 233.950 -999.990 ..C R7 1997 06 23 13 36 00 36.7300 126.1300 21.00 16.00 5.00 136587 TAP 1997 05 02 06 45 00 4272-91 P co CCGG 233.380 -999.990 ..C R7 1997 06 23 13 52 00 36.7300 126.1300 21.00 16.00 5.00 136588 TAP 1997 05 08 06 45 00 117-91 P co CCGG 249.150 -999.990 ..C R7 1997 06 19 10 45 00 36.7300 126.1300 21.00 16.00 5.00 136589 TAP 1997 05 08 06 45 00 118-91 P co CCGG 248.220 -999.990 ..C R7 1997 06 19 11 01 00 36.7300 126.1300 21.00 16.00 5.00 136590 TAP 1997 05 16 07 00 00 345-91 P co CCGG 200.250 -999.990 ... R7 1997 06 19 11 17 00 36.7300 126.1300 21.00 16.00 5.00 136591 TAP 1997 05 24 06 00 00 4311-91 P co CCGG 223.250 -999.990 ... R7 1997 06 23 12 32 00 36.7300 126.1300 21.00 16.00 5.00 136592 TAP 1997 05 24 06 00 00 4312-91 P co CCGG 222.120 -999.990 ... R7 1997 06 23 12 48 00 36.7300 126.1300 21.00 16.00 5.00 136593 TAP 1997 06 07 06 00 00 1223-91 P co CCGG 302.700 -999.990 P.C R7 1997 07 02 12 19 00 36.7300 126.1300 21.00 16.00 5.00 136594 TAP 1997 06 07 06 00 00 1224-91 P co CCGG 295.330 -999.990 P.C R7 1997 07 02 12 35 00 36.7300 126.1300 21.00 16.00 5.00 136595 TAP 1997 06 09 06 10 00 4269-91 P co CCGG 260.040 -999.990 ..C R7 1997 07 02 12 51 00 36.7300 126.1300 21.00 16.00 5.00 136596 TAP 1997 06 09 06 10 00 4270-91 P co CCGG 259.080 -999.990 ..C R7 1997 07 02 13 07 00 36.7300 126.1300 21.00 16.00 5.00 136597 TAP 1997 06 10 06 40 00 1119-91 P co CCGG 298.220 -999.990 P.C R7 1997 06 26 16 04 00 36.7300 126.1300 21.00 16.00 5.00 136598 TAP 1997 06 10 06 40 00 1120-91 P co CCGG 294.240 -999.990 P.C R7 1997 06 26 16 20 00 36.7300 126.1300 21.00 16.00 5.00 136599 TAP 1997 06 11 05 00 00 4181-91 P co CCGG 395.980 -999.990 ..C R7 1997 06 26 15 32 00 36.7300 126.1300 21.00 16.00 5.00 136600 TAP 1997 06 11 05 00 00 4182-91 P co CCGG 393.680 -999.990 ..C R7 1997 06 26 15 48 00 36.7300 126.1300 21.00 16.00 5.00 136601 TAP 1997 06 26 06 53 00 4277-91 P co CCGG 140.490 -999.990 *.. R7 1997 08 04 09 51 00 36.7300 126.1300 21.00 16.00 5.00 136602 TAP 1997 06 26 06 53 00 4278-91 P co CCGG 140.710 -999.990 *.. R7 1997 08 04 10 07 00 36.7300 126.1300 21.00 16.00 5.00 136603 TAP 1997 07 06 06 50 00 4559-91 P co CCGG 277.920 -999.990 *.C R7 1997 08 04 10 23 00 36.7300 126.1300 21.00 16.00 5.00 136604 TAP 1997 07 06 06 50 00 4560-91 P co CCGG 279.460 -999.990 *.C R7 1997 08 04 10 39 00 36.7300 126.1300 21.00 16.00 5.00 136605 TAP 1997 07 17 06 35 00 4563-91 P co CCGG 249.310 -999.990 ..C R5 1997 08 12 11 18 00 36.7300 126.1300 21.00 16.00 5.00 136606 TAP 1997 07 17 06 35 00 4564-91 P co CCGG 246.680 -999.990 ..C R5 1997 08 12 11 31 00 36.7300 126.1300 21.00 16.00 5.00 136607 TAP 1997 07 21 06 40 00 4553-91 P co CCGG 80.390 -999.990 P.. R5 1997 08 12 11 45 00 36.7300 126.1300 21.00 16.00 5.00 136608 TAP 1997 07 21 06 40 00 4554-91 P co CCGG 83.570 -999.990 P.. R5 1997 08 12 11 59 00 36.7300 126.1300 21.00 16.00 5.00 136609 TAP 1997 08 07 06 35 00 4287-91 P co CCGG 140.670 -999.990 ... R5 1997 09 09 13 47 00 36.7300 126.1300 21.00 16.00 5.00 136610 TAP 1997 08 07 06 35 00 4288-91 P co CCGG 138.510 -999.990 ... R5 1997 09 09 10 58 00 36.7300 126.1300 21.00 16.00 5.00 136611 TAP 1997 08 11 07 40 00 987-91 P co CCGG 280.390 -999.990 P.C R5 1997 09 09 10 16 00 36.7300 126.1300 21.00 16.00 5.00 136612 TAP 1997 08 11 07 40 00 988-91 P co CCGG 275.570 -999.990 P.C R5 1997 09 09 10 30 00 36.7300 126.1300 21.00 16.00 5.00 136613 TAP 1997 08 13 05 15 00 4325-91 P co CCGG 142.520 -999.990 ... R5 1997 09 09 09 49 00 36.7300 126.1300 21.00 16.00 5.00 136614 TAP 1997 08 13 05 15 00 4326-91 P co CCGG 143.350 -999.990 ... R5 1997 09 09 10 03 00 36.7300 126.1300 21.00 16.00 5.00 136615 TAP 1997 08 16 05 10 00 763-91 P co CCGG 230.750 -999.990 P.C R5 1997 08 27 14 46 00 36.7300 126.1300 21.00 16.00 5.00 136616 TAP 1997 08 16 05 10 00 764-91 P co CCGG 252.340 -999.990 P.C R5 1997 08 27 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136617 TAP 1997 08 17 04 00 00 1199-91 P co CCGG 271.730 -999.990 P.C R5 1997 08 27 14 18 00 36.7300 126.1300 21.00 16.00 5.00 136618 TAP 1997 08 17 04 00 00 1200-91 P co CCGG 204.530 -999.990 P.. R5 1997 08 27 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136619 TAP 1997 08 25 06 45 00 4225-91 P co CCGG 166.560 -999.990 ... R5 1997 10 20 13 59 00 36.7300 126.1300 21.00 16.00 5.00 136620 TAP 1997 08 25 06 45 00 4226-91 P co CCGG 167.880 -999.990 ... R5 1997 10 20 14 13 00 36.7300 126.1300 21.00 16.00 5.00 136621 TAP 1997 09 11 06 50 00 143-91 P co CCGG 342.950 -999.990 ..C R5 1997 10 20 13 33 00 36.7300 126.1300 21.00 16.00 5.00 136622 TAP 1997 09 11 06 50 00 144-91 P co CCGG 340.290 -999.990 ..C R5 1997 10 20 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136623 TAP 1997 09 19 06 45 00 1427-91 P co CCGG 132.800 -999.990 ... R5 1997 11 03 14 33 00 36.7300 126.1300 21.00 16.00 5.00 136624 TAP 1997 09 19 06 45 00 1428-91 P co CCGG 130.610 -999.990 ... R5 1997 11 03 14 47 00 36.7300 126.1300 21.00 16.00 5.00 136625 TAP 1997 09 29 06 20 00 4725-91 P co CCGG 185.240 -999.990 ... R5 1997 11 03 14 07 00 36.7300 126.1300 21.00 16.00 5.00 136626 TAP 1997 09 29 06 20 00 4726-91 P co CCGG 182.950 -999.990 ... R5 1997 11 03 14 20 00 36.7300 126.1300 21.00 16.00 5.00 136627 TAP 1997 10 04 06 40 00 4723-91 P co CCGG 163.780 -999.990 ... R5 1997 11 04 13 01 00 36.7300 126.1300 21.00 16.00 5.00 136628 TAP 1997 10 04 06 40 00 4724-91 P co CCGG 163.250 -999.990 ... R5 1997 11 04 13 14 00 36.7300 126.1300 21.00 16.00 5.00 136629 TAP 1997 10 08 06 45 00 4145-91 P co CCGG 136.270 -999.990 ... R5 1997 11 04 12 34 00 36.7300 126.1300 21.00 16.00 5.00 136630 TAP 1997 10 08 06 45 00 4146-91 P co CCGG 133.700 -999.990 ... R5 1997 11 04 12 48 00 36.7300 126.1300 21.00 16.00 5.00 136631 TAP 1997 10 14 06 30 00 833-91 P co CCGG 270.420 -999.990 ..C R5 1997 11 10 13 27 00 36.7300 126.1300 21.00 16.00 5.00 136632 TAP 1997 10 14 06 30 00 834-91 P co CCGG 270.350 -999.990 ..C R5 1997 11 10 13 40 00 36.7300 126.1300 21.00 16.00 5.00 136633 TAP 1997 10 16 06 40 00 1303-91 P co CCGG 227.770 -999.990 ... R5 1997 11 10 14 47 00 36.7300 126.1300 21.00 16.00 5.00 136634 TAP 1997 10 16 06 40 00 1304-91 P co CCGG 227.080 -999.990 ... R5 1997 11 10 15 00 00 36.7300 126.1300 21.00 16.00 5.00 136635 TAP 1997 10 17 03 15 00 549-91 D co CCGG 296.740 -999.990 ..C R5 1997 12 10 15 59 00 36.7300 126.1300 21.00 16.00 5.00 136636 TAP 1997 10 17 03 15 00 550-91 D co CCGG 298.230 -999.990 ..C R5 1997 12 10 16 13 00 36.7300 126.1300 21.00 16.00 5.00 136637 TAP 1997 10 23 06 40 00 1987-91 D co CCGG 261.910 -999.990 ..C R5 1997 12 10 14 11 00 36.7300 126.1300 21.00 16.00 5.00 136638 TAP 1997 10 23 06 40 00 1988-91 D co CCGG 264.430 -999.990 ..C R5 1997 12 10 14 24 00 36.7300 126.1300 21.00 16.00 5.00 136639 TAP 1997 10 27 06 40 00 377-91 D co CCGG 165.090 -999.990 ... R5 1997 12 15 14 33 00 36.7300 126.1300 21.00 16.00 5.00 136640 TAP 1997 10 27 06 40 00 378-91 D co CCGG 163.580 -999.990 ... R5 1997 12 15 14 46 00 36.7300 126.1300 21.00 16.00 5.00 136641 TAP 1997 10 30 06 30 00 4177-91 D co CCGG 295.050 -999.990 ..C R5 1997 12 15 15 00 00 36.7300 126.1300 21.00 16.00 5.00 136642 TAP 1997 10 30 06 30 00 4178-91 D co CCGG 297.560 -999.990 ..C R5 1997 12 15 15 13 00 36.7300 126.1300 21.00 16.00 5.00 136643 TAP 1997 11 15 06 45 00 1063-91 D co CCGG 295.810 -999.990 ..C R5 1998 01 08 09 29 00 36.7300 126.1300 21.00 16.00 5.00 136644 TAP 1997 11 15 06 45 00 1064-91 D co CCGG 298.290 -999.990 ..C R5 1998 01 08 09 42 00 36.7300 126.1300 21.00 16.00 5.00 136645 TAP 1997 11 19 06 45 00 621-91 D co CCGG 168.190 -999.990 ... R5 1998 01 08 09 01 00 36.7300 126.1300 21.00 16.00 5.00 136646 TAP 1997 11 19 06 45 00 622-91 D co CCGG 166.320 -999.990 ... R5 1998 01 08 09 15 00 36.7300 126.1300 21.00 16.00 5.00 136647 TAP 1997 11 27 06 20 00 317-91 D co CCGG 297.670 -999.990 ..C R5 1998 01 13 10 48 00 36.7300 126.1300 21.00 16.00 5.00 136648 TAP 1997 11 27 06 20 00 318-91 D co CCGG 297.870 -999.990 ..C R5 1998 01 13 11 02 00 36.7300 126.1300 21.00 16.00 5.00 136649 TAP 1997 11 30 06 45 00 4005-91 D co CCGG 178.360 -999.990 ... R5 1998 01 13 11 16 00 36.7300 126.1300 21.00 16.00 5.00 136650 TAP 1997 11 30 06 45 00 4006-91 D co CCGG 179.890 -999.990 ... R5 1998 01 13 11 30 00 36.7300 126.1300 21.00 16.00 5.00 136651 TAP 1997 12 03 06 10 00 1341-91 D co CCGG 174.330 -999.990 ... R5 1998 01 22 15 27 00 36.7300 126.1300 21.00 16.00 5.00 136652 TAP 1997 12 03 06 10 00 1342-91 D co CCGG 173.480 -999.990 ... R5 1998 01 22 15 41 00 36.7300 126.1300 21.00 16.00 5.00 136653 TAP 1997 12 10 06 40 00 1-91 D co CCGG 247.660 -999.990 ..C R5 1998 01 22 16 22 00 36.7300 126.1300 21.00 16.00 5.00 136654 TAP 1997 12 10 06 40 00 2-91 D co CCGG 249.990 -999.990 ..C R5 1998 01 22 16 36 00 36.7300 126.1300 21.00 16.00 5.00 136655 TAP 1997 12 15 06 35 00 4568-91 D co CCGG 485.010 -999.990 .XC R5 1998 01 23 10 30 00 36.7300 126.1300 21.00 16.00 5.00 136656 TAP 1997 12 17 06 45 00 669-91 D co CCGG 381.910 -999.990 ..C R5 1998 01 22 15 55 00 36.7300 126.1300 21.00 16.00 5.00 136657 TAP 1997 12 17 06 45 00 670-91 D co CCGG 382.620 -999.990 ..C R5 1998 01 22 16 08 00 36.7300 126.1300 21.00 16.00 5.00 136658 TAP 1998 01 07 06 50 00 663-91 D co CCGG 234.950 -999.990 ..C R5 1998 03 05 15 01 00 36.7300 126.1300 21.00 16.00 5.00 136659 TAP 1998 01 07 06 50 00 664-91 D co CCGG 233.400 -999.990 ..C R5 1998 03 05 15 14 00 36.7300 126.1300 21.00 16.00 5.00 136660 TAP 1998 01 09 06 40 00 4487-91 D co CCGG 381.120 -999.990 ..C R5 1998 03 05 14 06 00 36.7300 126.1300 21.00 16.00 5.00 136661 TAP 1998 01 09 06 40 00 4488-91 D co CCGG 379.430 -999.990 ..C R5 1998 03 05 14 20 00 36.7300 126.1300 21.00 16.00 5.00 136662 TAP 1998 01 19 06 50 00 4221-91 D co CCGG 271.340 -999.990 P.C R5 1998 02 27 10 13 00 36.7300 126.1300 21.00 16.00 5.00 136663 TAP 1998 01 19 06 50 00 4222-91 D co CCGG 228.810 -999.990 P.C R5 1998 02 27 10 26 00 36.7300 126.1300 21.00 16.00 5.00 136664 TAP 1998 01 28 06 00 00 1047-91 D co CCGG 252.030 -999.990 ..C R5 1998 03 11 13 49 00 36.7300 126.1300 21.00 16.00 5.00 136665 TAP 1998 01 28 06 00 00 1048-91 D co CCGG 252.330 -999.990 ..C R5 1998 03 11 14 03 00 36.7300 126.1300 21.00 16.00 5.00 136666 TAP 1998 02 02 06 25 00 115-91 D co CCGG 265.840 -999.990 ..C R5 1998 03 11 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136667 TAP 1998 02 02 06 25 00 116-91 D co CCGG 264.600 -999.990 ..C R5 1998 03 11 13 36 00 36.7300 126.1300 21.00 16.00 5.00 136668 TAP 1998 02 05 06 40 00 4187-91 D co CCGG 259.230 -999.990 ..C R5 1998 03 13 12 39 00 36.7300 126.1300 21.00 16.00 5.00 136669 TAP 1998 02 05 06 40 00 4188-91 D co CCGG 258.730 -999.990 ..C R5 1998 03 13 12 52 00 36.7300 126.1300 21.00 16.00 5.00 136670 TAP 1998 02 07 06 35 00 4101-91 D co CCGG 428.620 -999.990 ..C R5 1998 03 13 11 15 00 36.7300 126.1300 21.00 16.00 5.00 136671 TAP 1998 02 07 06 35 00 4102-91 D co CCGG 428.780 -999.990 ..C R5 1998 03 13 11 29 00 36.7300 126.1300 21.00 16.00 5.00 136672 TAP 1998 02 10 06 35 00 837-91 D co CCGG 365.420 -999.990 ..C R5 1998 03 11 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136673 TAP 1998 02 10 06 35 00 838-91 D co CCGG 367.320 -999.990 ..C R5 1998 03 11 14 30 00 36.7300 126.1300 21.00 16.00 5.00 136674 TAP 1998 02 13 06 10 00 597-91 D co CCGG 316.580 -999.990 ..C R5 1998 03 11 14 46 00 36.7300 126.1300 21.00 16.00 5.00 136675 TAP 1998 02 13 06 10 00 598-91 D co CCGG 314.340 -999.990 ..C R5 1998 03 11 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136676 TAP 1998 02 14 06 35 00 1813-91 D co CCGG 415.410 -999.990 ..C R5 1998 03 20 14 04 00 36.7300 126.1300 21.00 16.00 5.00 136677 TAP 1998 02 14 06 35 00 1814-91 D co CCGG 414.050 -999.990 ..C R5 1998 03 20 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136678 TAP 1998 02 18 06 50 00 1693-91 D co CCGG 283.730 -999.990 ..C R5 1998 03 20 13 36 00 36.7300 126.1300 21.00 16.00 5.00 136679 TAP 1998 02 18 06 50 00 1694-91 D co CCGG 283.640 -999.990 ..C R5 1998 03 20 13 50 00 36.7300 126.1300 21.00 16.00 5.00 136680 TAP 1998 02 20 06 25 00 4297-91 D co CCGG 265.960 -999.990 ..C R5 1998 03 19 09 31 00 36.7300 126.1300 21.00 16.00 5.00 136681 TAP 1998 02 20 06 25 00 4298-91 D co CCGG 265.410 -999.990 ..C R5 1998 03 19 09 45 00 36.7300 126.1300 21.00 16.00 5.00 136682 TAP 1998 02 24 06 45 00 4015-91 D co CCGG 222.520 -999.990 P.. R5 1998 03 19 09 59 00 36.7300 126.1300 21.00 16.00 5.00 136683 TAP 1998 02 24 06 45 00 4016-91 D co CCGG 550.010 -999.990 P.C R5 1998 03 19 10 12 00 36.7300 126.1300 21.00 16.00 5.00 136684 TAP 1998 03 12 06 20 00 199-91 D co CCGG 348.370 -999.990 ..C R5 1998 05 06 10 08 00 36.7300 126.1300 21.00 16.00 5.00 136685 TAP 1998 03 12 06 20 00 200-91 D co CCGG 348.720 -999.990 ..C R5 1998 05 06 10 22 00 36.7300 126.1300 21.00 16.00 5.00 136686 TAP 1998 03 14 04 55 00 707-91 D co CCGG 238.860 -999.990 ..C R5 1998 05 06 10 56 00 36.7300 126.1300 21.00 16.00 5.00 136687 TAP 1998 03 14 04 55 00 708-91 D co CCGG 240.690 -999.990 ..C R5 1998 05 06 11 10 00 36.7300 126.1300 21.00 16.00 5.00 136688 TAP 1998 03 21 03 20 00 885-91 D co CCGG 229.770 -999.990 ..C R5 1998 05 06 09 41 00 36.7300 126.1300 21.00 16.00 5.00 136689 TAP 1998 03 21 03 20 00 886-91 D co CCGG 227.530 -999.990 ... R5 1998 05 06 09 54 00 36.7300 126.1300 21.00 16.00 5.00 136690 TAP 1998 03 23 05 25 00 4241-91 D co CCGG 248.060 -999.990 ..C R5 1998 05 06 09 13 00 36.7300 126.1300 21.00 16.00 5.00 136691 TAP 1998 03 23 05 25 00 4242-91 D co CCGG 247.800 -999.990 ..C R5 1998 05 06 09 27 00 36.7300 126.1300 21.00 16.00 5.00 136692 TAP 1998 04 02 05 47 00 1613-91 D co CCGG 238.910 -999.990 ..C R5 1998 05 18 09 37 00 36.7300 126.1300 21.00 16.00 5.00 136693 TAP 1998 04 02 05 47 00 1614-91 D co CCGG 240.940 -999.990 ..C R5 1998 05 18 09 51 00 36.7300 126.1300 21.00 16.00 5.00 136694 TAP 1998 04 06 06 15 00 1611-91 D co CCGG 259.590 -999.990 ..C R5 1998 05 18 11 00 00 36.7300 126.1300 21.00 16.00 5.00 136695 TAP 1998 04 06 06 15 00 1612-91 D co CCGG 259.300 -999.990 ..C R5 1998 05 18 11 14 00 36.7300 126.1300 21.00 16.00 5.00 136696 TAP 1998 04 18 04 35 00 153-91 D co CCGG 331.530 -999.990 ..C R5 1998 05 19 12 24 00 36.7300 126.1300 21.00 16.00 5.00 136697 TAP 1998 04 18 04 35 00 154-91 D co CCGG 329.810 -999.990 ..C R5 1998 05 19 12 37 00 36.7300 126.1300 21.00 16.00 5.00 136698 TAP 1998 04 28 04 15 00 1449-91 D co CCGG 286.400 -999.990 P.C R5 1998 05 19 12 51 00 36.7300 126.1300 21.00 16.00 5.00 136699 TAP 1998 04 28 04 15 00 1450-91 D co CCGG 282.540 -999.990 P.C R5 1998 05 19 13 05 00 36.7300 126.1300 21.00 16.00 5.00 136700 TAP 1998 05 04 07 20 00 4079-91 D co CCGG 355.550 -999.990 ..C R5 1998 06 19 16 02 00 36.7300 126.1300 21.00 16.00 5.00 136701 TAP 1998 05 04 07 20 00 4080-91 D co CCGG 356.390 -999.990 ..C R5 1998 06 19 16 16 00 36.7300 126.1300 21.00 16.00 5.00 136702 TAP 1998 05 08 07 35 00 767-91 D co CCGG 230.980 -999.990 ..C R5 1998 06 22 09 32 00 36.7300 126.1300 21.00 16.00 5.00 136703 TAP 1998 05 08 07 35 00 768-91 D co CCGG 230.360 -999.990 ..C R5 1998 06 22 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136704 TAP 1998 05 14 06 50 00 355-91 D co CCGG 432.170 -999.990 .XC R5 1998 06 19 14 12 00 36.7300 126.1300 21.00 16.00 5.00 136705 TAP 1998 05 14 06 50 00 356-91 D co CCGG 431.360 -999.990 .XC R5 1998 06 19 14 25 00 36.7300 126.1300 21.00 16.00 5.00 136706 TAP 1998 05 25 07 45 00 4683-91 D co CCGG 226.470 -999.990 ... R5 1998 06 19 15 35 00 36.7300 126.1300 21.00 16.00 5.00 136707 TAP 1998 05 25 07 45 00 4684-91 D co CCGG 226.860 -999.990 ... R5 1998 06 19 15 49 00 36.7300 126.1300 21.00 16.00 5.00 136708 TAP 1998 06 14 06 20 00 1429-91 D co CCGG 187.340 -999.990 ... R5 1998 07 31 14 35 00 36.7300 126.1300 21.00 16.00 5.00 136709 TAP 1998 06 14 06 20 00 1430-91 D co CCGG 189.100 -999.990 ... R5 1998 07 31 14 49 00 36.7300 126.1300 21.00 16.00 5.00 136710 TAP 1998 06 20 05 30 00 115-91 D co CCGG 268.480 -999.990 ..C R5 1998 07 31 14 08 00 36.7300 126.1300 21.00 16.00 5.00 136711 TAP 1998 06 20 05 30 00 116-91 D co CCGG 266.630 -999.990 ..C R5 1998 07 31 14 21 00 36.7300 126.1300 21.00 16.00 5.00 136712 TAP 1998 06 21 06 50 00 75-91 D co CCGG 195.260 -999.990 ... R5 1998 07 29 14 03 00 36.7300 126.1300 21.00 16.00 5.00 136713 TAP 1998 06 21 06 50 00 76-91 D co CCGG 194.820 -999.990 ... R5 1998 07 29 14 17 00 36.7300 126.1300 21.00 16.00 5.00 136714 TAP 1998 07 04 03 50 00 1953-91 D co CCGG 293.350 -999.990 ..C R5 1998 07 29 13 08 00 36.7300 126.1300 21.00 16.00 5.00 136715 TAP 1998 07 04 03 50 00 1954-91 D co CCGG 294.100 -999.990 ..C R5 1998 07 29 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136716 TAP 1998 07 06 08 15 00 1027-91 D co CCGG 90.930 -999.990 ... R5 1998 08 28 13 59 00 36.7300 126.1300 21.00 16.00 5.00 136717 TAP 1998 07 06 08 15 00 1028-91 D co CCGG 90.010 -999.990 ... R5 1998 08 28 14 12 00 36.7300 126.1300 21.00 16.00 5.00 136718 TAP 1998 07 11 06 15 00 79-91 D co CCGG 183.060 -999.990 ... R5 1998 08 31 10 31 00 36.7300 126.1300 21.00 16.00 5.00 136719 TAP 1998 07 27 07 15 00 1161-91 D co CCGG 168.800 -999.990 P.. R5 1998 08 31 16 19 00 36.7300 126.1300 21.00 16.00 5.00 136720 TAP 1998 07 27 07 15 00 1162-91 D co CCGG 153.420 -999.990 P.. R5 1998 08 31 16 32 00 36.7300 126.1300 21.00 16.00 5.00 136721 TAP 1998 08 07 07 35 00 1293-91 D co CCGG 85.630 -999.990 P.. R5 1998 09 23 09 16 00 36.7300 126.1300 21.00 16.00 5.00 136722 TAP 1998 08 07 07 35 00 1294-91 D co CCGG 81.090 -999.990 P.. R5 1998 09 23 09 30 00 36.7300 126.1300 21.00 16.00 5.00 136723 TAP 1998 08 18 05 40 00 523-91 D co CCGG -999.990 -999.990 I.. R5 1998 09 22 16 15 00 36.7300 126.1300 21.00 16.00 5.00 136724 TAP 1998 08 18 05 40 00 524-91 D co CCGG -999.990 -999.990 I.. R5 1998 09 22 16 29 00 36.7300 126.1300 21.00 16.00 5.00 136725 TAP 1998 08 25 05 30 00 1209-91 D co CCGG 394.090 -999.990 .XC R5 1998 09 23 10 11 00 36.7300 126.1300 21.00 16.00 5.00 136726 TAP 1998 08 25 05 30 00 1210-91 D co CCGG 393.760 -999.990 .XC R5 1998 09 23 10 24 00 36.7300 126.1300 21.00 16.00 5.00 136727 TAP 1998 08 31 07 35 00 1239-91 D co CCGG 288.060 -999.990 ..C R5 1998 09 23 09 43 00 36.7300 126.1300 21.00 16.00 5.00 136728 TAP 1998 08 31 07 35 00 1240-91 D co CCGG 286.520 -999.990 ..C R5 1998 09 23 09 57 00 36.7300 126.1300 21.00 16.00 5.00 136729 TAP 1998 09 11 07 05 00 1441-91 D co CCGG 537.000 -999.990 P.C R5 1999 02 04 13 05 00 36.7300 126.1300 21.00 16.00 5.00 136730 TAP 1998 09 11 07 05 00 1442-91 D co CCGG 492.540 -999.990 P.C R5 1999 02 04 13 18 00 36.7300 126.1300 21.00 16.00 5.00 136731 TAP 1998 09 16 08 25 00 4345-91 D co CCGG 225.800 -999.990 ... R5 1999 02 04 13 32 00 36.7300 126.1300 21.00 16.00 5.00 136732 TAP 1998 09 16 08 25 00 4346-91 D co CCGG 225.750 -999.990 ... R5 1999 02 04 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136733 TAP 1998 09 22 08 20 00 1567-91 D co CCGG 187.200 -999.990 ... R5 1998 10 30 13 21 00 36.7300 126.1300 21.00 16.00 5.00 136734 TAP 1998 09 22 08 20 00 1568-91 D co CCGG 186.110 -999.990 ... R5 1998 10 30 13 34 00 36.7300 126.1300 21.00 16.00 5.00 136735 TAP 1998 10 01 06 50 00 2023-91 D co CCGG 153.630 -999.990 ... R5 1998 10 30 14 15 00 36.7300 126.1300 21.00 16.00 5.00 136736 TAP 1998 10 01 06 50 00 2024-91 D co CCGG 153.090 -999.990 ... R5 1998 10 30 14 29 00 36.7300 126.1300 21.00 16.00 5.00 136737 TAP 1998 10 03 06 30 00 1517-91 D co CCGG 258.020 -999.990 ..C R5 1998 10 28 11 48 00 36.7300 126.1300 21.00 16.00 5.00 136738 TAP 1998 10 03 06 30 00 1518-91 D co CCGG 259.660 -999.990 ..C R5 1998 10 28 12 01 00 36.7300 126.1300 21.00 16.00 5.00 136739 TAP 1998 10 04 06 00 00 4083-91 D co CCGG 342.820 -999.990 ..C R5 1998 10 28 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136740 TAP 1998 10 04 06 00 00 4084-91 D co CCGG 342.820 -999.990 ..C R5 1998 10 28 12 29 00 36.7300 126.1300 21.00 16.00 5.00 136741 TAP 1998 10 05 06 25 00 1351-91 D co CCGG 261.900 -999.990 ..C R5 1998 10 23 16 30 00 36.7300 126.1300 21.00 16.00 5.00 136742 TAP 1998 10 05 06 25 00 1352-91 D co CCGG 259.520 -999.990 ..C R5 1998 10 23 16 44 00 36.7300 126.1300 21.00 16.00 5.00 136743 TAP 1998 10 08 06 20 00 4173-91 D co CCGG 231.660 -999.990 ..C R5 1998 10 28 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136744 TAP 1998 10 08 06 20 00 4174-91 D co CCGG 232.620 -999.990 ..C R5 1998 10 28 12 56 00 36.7300 126.1300 21.00 16.00 5.00 136745 TAP 1998 10 09 07 30 00 5-98 D co CCGG 260.120 -999.990 ..C R5 1998 11 23 09 38 00 36.7300 126.1300 21.00 16.00 5.00 136746 TAP 1998 10 09 07 30 00 6-98 D co CCGG 258.940 -999.990 ..C R5 1998 11 23 09 52 00 36.7300 126.1300 21.00 16.00 5.00 136747 TAP 1998 10 15 07 30 00 10-98 D co CCGG 220.880 -999.990 ... R5 1998 11 23 10 19 00 36.7300 126.1300 21.00 16.00 5.00 136748 TAP 1998 10 15 07 30 00 9-98 D co CCGG 220.700 -999.990 ... R5 1998 11 23 10 05 00 36.7300 126.1300 21.00 16.00 5.00 136749 TAP 1998 10 20 07 00 00 1637-91 D co CCGG 249.060 -999.990 ..C R5 1998 11 24 09 40 00 36.7300 126.1300 21.00 16.00 5.00 136750 TAP 1998 10 20 07 00 00 1638-91 D co CCGG 248.580 -999.990 ..C R5 1998 11 24 09 54 00 36.7300 126.1300 21.00 16.00 5.00 136751 TAP 1998 10 29 06 10 00 143-91 D co CCGG 273.430 -999.990 ..C R5 1998 11 24 10 08 00 36.7300 126.1300 21.00 16.00 5.00 136752 TAP 1998 10 29 06 10 00 144-91 D co CCGG 274.140 -999.990 ..C R5 1998 11 24 10 21 00 36.7300 126.1300 21.00 16.00 5.00 136753 TAP 1998 11 03 06 20 00 1232-91 D co CCGG 195.150 -999.990 ... R5 1999 02 04 15 36 00 36.7300 126.1300 21.00 16.00 5.00 136754 TAP 1998 11 03 06 20 00 1609-91 D co CCGG 194.530 -999.990 ... R5 1999 02 04 15 50 00 36.7300 126.1300 21.00 16.00 5.00 136755 TAP 1998 11 10 06 50 00 7-91 D co CCGG 209.700 -999.990 ... R5 1999 02 04 16 04 00 36.7300 126.1300 21.00 16.00 5.00 136756 TAP 1998 11 10 06 50 00 8-91 D co CCGG 209.330 -999.990 ... R5 1999 02 04 16 17 00 36.7300 126.1300 21.00 16.00 5.00 136757 TAP 1998 11 20 06 20 00 261-91 D co CCGG 205.360 -999.990 ... R5 1998 12 21 12 03 00 36.7300 126.1300 21.00 16.00 5.00 136758 TAP 1998 11 20 06 20 00 262-91 D co CCGG 204.790 -999.990 ... R5 1998 12 21 12 16 00 36.7300 126.1300 21.00 16.00 5.00 136759 TAP 1998 11 27 05 20 00 1579-91 D co CCGG 475.630 -999.990 .XC R5 1998 12 21 13 25 00 36.7300 126.1300 21.00 16.00 5.00 136760 TAP 1998 11 27 05 20 00 1580-91 D co CCGG 474.810 -999.990 .XC R5 1998 12 21 13 38 00 36.7300 126.1300 21.00 16.00 5.00 136761 TAP 1998 12 02 06 25 00 151-91 D co CCGG 264.060 -999.990 ..C R5 1999 01 22 17 07 00 36.7300 126.1300 21.00 16.00 5.00 136762 TAP 1998 12 08 07 10 00 845-91 D co CCGG 208.030 -999.990 ... R5 1999 01 21 15 47 00 36.7300 126.1300 21.00 16.00 5.00 136763 TAP 1998 12 08 07 10 00 846-91 D co CCGG 206.840 -999.990 ... R5 1999 01 21 16 01 00 36.7300 126.1300 21.00 16.00 5.00 136764 TAP 1998 12 16 06 35 00 1655-91 D co CCGG 447.150 -999.990 .XC R5 1999 01 25 13 25 00 36.7300 126.1300 21.00 16.00 5.00 136765 TAP 1998 12 16 06 35 00 1656-91 D co CCGG 444.650 -999.990 .XC R5 1999 01 25 13 39 00 36.7300 126.1300 21.00 16.00 5.00 136766 TAP 1998 12 22 06 40 00 4085-91 D co CCGG 328.970 -999.990 ..C R5 1999 01 25 12 15 00 36.7300 126.1300 21.00 16.00 5.00 136767 TAP 1998 12 29 06 00 00 1501-91 D co CCGG 215.790 -999.990 ... R5 1999 02 16 14 24 00 36.7300 126.1300 21.00 16.00 5.00 136768 TAP 1998 12 29 06 00 00 1502-91 D co CCGG 213.740 -999.990 ... R5 1999 02 16 14 37 00 36.7300 126.1300 21.00 16.00 5.00 136769 TAP 1999 01 10 05 25 00 1715-91 D co CCGG 236.290 -999.990 ..C R5 1999 02 16 14 51 00 36.7300 126.1300 21.00 16.00 5.00 136770 TAP 1999 01 10 05 25 00 1716-91 D co CCGG 236.470 -999.990 ..C R5 1999 02 16 15 04 00 36.7300 126.1300 21.00 16.00 5.00 136771 TAP 1999 01 16 05 05 00 659-91 D co CCGG 212.460 -999.990 ... R5 1999 02 16 15 18 00 36.7300 126.1300 21.00 16.00 5.00 136772 TAP 1999 01 16 05 05 00 660-91 D co CCGG 214.770 -999.990 ... R5 1999 02 16 15 32 00 36.7300 126.1300 21.00 16.00 5.00 136773 TAP 1999 01 21 05 50 00 543-91 D co CCGG 361.990 -999.990 ..C R5 1999 02 17 14 46 00 36.7300 126.1300 21.00 16.00 5.00 136774 TAP 1999 01 21 05 50 00 544-91 D co CCGG 361.830 -999.990 ..C R5 1999 02 17 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136775 TAP 1999 01 30 05 50 00 1711-91 D co CCGG 220.050 -999.990 ... R5 1999 03 17 14 59 00 36.7300 126.1300 21.00 16.00 5.00 136776 TAP 1999 01 30 05 50 00 1712-91 D co CCGG 219.620 -999.990 ... R5 1999 03 17 15 12 00 36.7300 126.1300 21.00 16.00 5.00 136777 TAP 1999 02 04 05 50 00 1159-91 D co CCGG 242.770 -999.990 ..C R5 1999 03 17 14 30 00 36.7300 126.1300 21.00 16.00 5.00 136778 TAP 1999 02 04 05 50 00 1160-91 D co CCGG 242.140 -999.990 ..C R5 1999 03 17 14 43 00 36.7300 126.1300 21.00 16.00 5.00 136779 TAP 1999 02 12 05 20 00 565-91 D co CCGG 216.970 -999.990 ... R5 1999 03 18 14 13 00 36.7300 126.1300 21.00 16.00 5.00 136780 TAP 1999 02 12 05 20 00 566-91 D co CCGG 218.380 -999.990 ... R5 1999 03 18 14 27 00 36.7300 126.1300 21.00 16.00 5.00 136781 TAP 1999 02 22 05 10 00 4315-91 D co CCGG 284.320 -999.990 ..C R5 1999 03 18 13 46 00 36.7300 126.1300 21.00 16.00 5.00 136782 TAP 1999 02 22 05 10 00 4316-91 D co CCGG 282.540 -999.990 ..C R5 1999 03 18 13 59 00 36.7300 126.1300 21.00 16.00 5.00 136783 TAP 1999 02 27 03 05 00 63-91 D co CCGG 188.810 -999.990 ... R5 1999 04 09 11 17 00 36.7300 126.1300 21.00 16.00 5.00 136784 TAP 1999 02 27 03 05 00 64-91 D co CCGG 189.070 -999.990 ... R5 1999 04 09 11 31 00 36.7300 126.1300 21.00 16.00 5.00 136785 TAP 1999 03 09 05 05 00 225-91 D co CCGG 328.750 -999.990 ..C R5 1999 04 09 13 08 00 36.7300 126.1300 21.00 16.00 5.00 136786 TAP 1999 03 09 05 05 00 226-91 D co CCGG 325.150 -999.990 ..C R5 1999 04 09 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136787 TAP 1999 03 11 05 45 00 637-91 D co CCGG 224.130 -999.990 ... R5 1999 04 14 09 22 00 36.7300 126.1300 21.00 16.00 5.00 136788 TAP 1999 03 11 05 45 00 638-91 D co CCGG 222.940 -999.990 ... R5 1999 04 14 09 36 00 36.7300 126.1300 21.00 16.00 5.00 136789 TAP 1999 03 23 04 35 00 4165-91 D co CCGG 245.540 -999.990 ..C R5 1999 04 14 09 50 00 36.7300 126.1300 21.00 16.00 5.00 136790 TAP 1999 03 23 04 35 00 4166-91 D co CCGG 246.160 -999.990 ..C R5 1999 04 14 10 03 00 36.7300 126.1300 21.00 16.00 5.00 136791 TAP 1999 03 30 05 20 00 4381-91 D co CCGG 469.660 -999.990 .XC R5 1999 07 07 13 52 00 36.7300 126.1300 21.00 16.00 5.00 136792 TAP 1999 03 30 05 20 00 4382-91 D co CCGG 468.360 -999.990 .XC R5 1999 07 07 14 05 00 36.7300 126.1300 21.00 16.00 5.00 136793 TAP 1999 04 02 03 50 00 1611-91 D co CCGG 239.460 -999.990 ..C R5 1999 07 07 12 30 00 36.7300 126.1300 21.00 16.00 5.00 136794 TAP 1999 04 02 03 50 00 1612-91 D co CCGG 240.800 -999.990 ..C R5 1999 07 07 12 43 00 36.7300 126.1300 21.00 16.00 5.00 136795 TAP 1999 04 13 05 20 00 120-91 D co CCGG 196.480 -999.990 ... R5 1999 05 20 11 16 00 36.7300 126.1300 21.00 16.00 5.00 136796 TAP 1999 04 19 04 10 00 4841-91 D co CCGG 245.440 -999.990 ..C R5 1999 05 20 13 49 00 36.7300 126.1300 21.00 16.00 5.00 136797 TAP 1999 04 19 04 10 00 4842-91 D co CCGG 244.040 -999.990 ..C R5 1999 05 20 14 03 00 36.7300 126.1300 21.00 16.00 5.00 136798 TAP 1999 04 24 05 20 00 431-91 D co CCGG 296.330 -999.990 ..C R5 1999 05 13 15 38 00 36.7300 126.1300 21.00 16.00 5.00 136799 TAP 1999 04 24 05 20 00 432-91 D co CCGG 295.620 -999.990 ..C R5 1999 05 13 15 52 00 36.7300 126.1300 21.00 16.00 5.00 136800 TAP 1999 04 28 05 10 00 1199-91 D co CCGG 279.380 -999.990 P.C R5 1999 05 13 16 05 00 36.7300 126.1300 21.00 16.00 5.00 136801 TAP 1999 04 28 05 10 00 1200-91 D co CCGG 283.920 -999.990 P.C R5 1999 05 13 16 19 00 36.7300 126.1300 21.00 16.00 5.00 136802 TAP 1999 04 30 06 20 00 1635-91 D co CCGG 316.330 -999.990 ..C R5 1999 05 26 09 19 00 36.7300 126.1300 21.00 16.00 5.00 136803 TAP 1999 04 30 06 20 00 1636-91 D co CCGG 316.570 -999.990 ..C R5 1999 05 26 09 33 00 36.7300 126.1300 21.00 16.00 5.00 136804 TAP 1999 05 06 06 10 00 1905-91 D co CCGG 309.270 -999.990 ..C R5 1999 05 26 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136805 TAP 1999 05 06 06 10 00 1906-91 D co CCGG 307.840 -999.990 ..C R5 1999 05 26 10 00 00 36.7300 126.1300 21.00 16.00 5.00 136806 TAP 1999 05 12 04 40 00 4417-91 D co CCGG 248.700 -999.990 ..C R5 1999 06 07 09 32 00 36.7300 126.1300 21.00 16.00 5.00 136807 TAP 1999 05 12 04 40 00 4418-91 D co CCGG 247.370 -999.990 ..C R5 1999 06 07 09 45 00 36.7300 126.1300 21.00 16.00 5.00 136808 TAP 1999 05 16 06 20 00 4087-91 D co CCGG 253.530 -999.990 P.C R5 1999 06 07 10 41 00 36.7300 126.1300 21.00 16.00 5.00 136809 TAP 1999 05 16 06 20 00 4088-91 D co CCGG 246.650 -999.990 P.C R5 1999 06 07 10 55 00 36.7300 126.1300 21.00 16.00 5.00 136810 TAP 1999 05 19 05 40 00 10-91 D co CCGG 286.170 -999.990 ..C R5 1999 06 10 10 59 00 36.7300 126.1300 21.00 16.00 5.00 136811 TAP 1999 05 19 05 40 00 9-91 D co CCGG 287.070 -999.990 ..C R5 1999 06 10 10 46 00 36.7300 126.1300 21.00 16.00 5.00 136812 TAP 1999 05 21 06 00 00 4629-91 D co CCGG 419.330 -999.990 P.C R5 1999 06 10 10 17 00 36.7300 126.1300 21.00 16.00 5.00 136813 TAP 1999 05 21 06 00 00 4630-91 D co CCGG 412.350 -999.990 P.C R5 1999 06 10 10 31 00 36.7300 126.1300 21.00 16.00 5.00 136814 TAP 1999 05 28 05 20 00 4357-91 D co CCGG 219.600 -999.990 ... R5 1999 07 06 10 24 00 36.7300 126.1300 21.00 16.00 5.00 136815 TAP 1999 05 28 05 20 00 4358-91 D co CCGG 218.930 -999.990 ... R5 1999 07 06 10 37 00 36.7300 126.1300 21.00 16.00 5.00 136816 TAP 1999 06 02 06 10 00 15-91 D co CCGG 245.770 -999.990 ..C R5 1999 07 06 09 56 00 36.7300 126.1300 21.00 16.00 5.00 136817 TAP 1999 06 02 06 10 00 16-91 D co CCGG 245.010 -999.990 ..C R5 1999 07 06 10 10 00 36.7300 126.1300 21.00 16.00 5.00 136818 TAP 1999 06 08 06 10 00 163-91 D co CCGG 314.460 -999.990 ..C R5 1999 07 15 14 05 00 36.7300 126.1300 21.00 16.00 5.00 136819 TAP 1999 06 08 06 10 00 164-91 D co CCGG 311.690 -999.990 ..C R5 1999 07 15 14 19 00 36.7300 126.1300 21.00 16.00 5.00 136820 TAP 1999 06 11 06 40 00 4490-91 D co CCGG 197.790 -999.990 P.. R5 1999 07 15 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136821 TAP 1999 06 11 06 40 00 627-91 D co CCGG 194.660 -999.990 P.. R5 1999 07 15 14 46 00 36.7300 126.1300 21.00 16.00 5.00 136822 TAP 1999 06 24 04 30 00 4489-91 D co CCGG 173.430 -999.990 ... R5 1999 07 22 13 27 00 36.7300 126.1300 21.00 16.00 5.00 136823 TAP 1999 06 24 04 30 00 4750-91 D co CCGG 173.160 -999.990 ... R5 1999 07 22 13 41 00 36.7300 126.1300 21.00 16.00 5.00 136824 TAP 1999 06 29 06 45 00 731-91 D co CCGG 332.660 -999.990 ..C R5 1999 07 22 13 00 00 36.7300 126.1300 21.00 16.00 5.00 136825 TAP 1999 06 29 06 45 00 732-91 D co CCGG 333.560 -999.990 ..C R5 1999 07 22 13 13 00 36.7300 126.1300 21.00 16.00 5.00 136826 TAP 1999 07 06 06 30 00 167-98 D co CCGG 163.810 -999.990 ... R5 1999 08 03 09 56 00 36.7300 126.1300 21.00 16.00 5.00 136827 TAP 1999 07 06 06 30 00 168-98 D co CCGG 163.350 -999.990 ... R5 1999 08 03 10 10 00 36.7300 126.1300 21.00 16.00 5.00 136828 TAP 1999 07 12 06 40 00 4551-91 D co CCGG 192.030 -999.990 ... R5 1999 08 02 14 02 00 36.7300 126.1300 21.00 16.00 5.00 136829 TAP 1999 07 12 06 40 00 4552-91 D co CCGG 191.290 -999.990 ... R5 1999 08 02 14 16 00 36.7300 126.1300 21.00 16.00 5.00 136830 TAP 1999 07 20 06 30 00 1995-91 D co CCGG 235.540 -999.990 ..C R5 1999 09 07 10 27 00 36.7300 126.1300 21.00 16.00 5.00 136831 TAP 1999 07 20 06 30 00 1996-91 D co CCGG 233.740 -999.990 ..C R5 1999 09 07 10 41 00 36.7300 126.1300 21.00 16.00 5.00 136832 TAP 1999 07 25 07 00 00 1635-91 D co CCGG 75.190 -999.990 ... R5 1999 09 07 09 32 00 36.7300 126.1300 21.00 16.00 5.00 136833 TAP 1999 07 25 07 00 00 1636-91 D co CCGG 75.440 -999.990 ... R5 1999 09 07 09 46 00 36.7300 126.1300 21.00 16.00 5.00 136834 TAP 1999 08 13 06 40 00 4755-91 D co CCGG 284.810 -999.990 P.C R5 1999 09 07 14 25 00 36.7300 126.1300 21.00 16.00 5.00 136835 TAP 1999 08 13 06 40 00 4756-91 D co CCGG 277.420 -999.990 P.C R5 1999 09 07 14 38 00 36.7300 126.1300 21.00 16.00 5.00 136836 TAP 1999 08 19 06 30 00 231-91 D co CCGG 212.100 -999.990 ... R5 1999 09 07 15 47 00 36.7300 126.1300 21.00 16.00 5.00 136837 TAP 1999 08 19 06 30 00 232-91 D co CCGG 212.410 -999.990 ... R5 1999 09 07 16 00 00 36.7300 126.1300 21.00 16.00 5.00 136838 TAP 1999 08 24 07 00 00 169-91 D co CCGG 208.890 -999.990 ... R5 1999 09 21 11 28 00 36.7300 126.1300 21.00 16.00 5.00 136839 TAP 1999 08 24 07 00 00 170-91 D co CCGG 208.700 -999.990 ... R5 1999 09 21 11 42 00 36.7300 126.1300 21.00 16.00 5.00 136840 TAP 1999 09 01 06 30 00 603-91 D co CCGG 184.480 -999.990 P.. R5 1999 09 21 11 55 00 36.7300 126.1300 21.00 16.00 5.00 136841 TAP 1999 09 01 06 30 00 604-91 D co CCGG 190.640 -999.990 P.. R5 1999 09 21 12 09 00 36.7300 126.1300 21.00 16.00 5.00 136842 TAP 1999 09 03 06 45 00 585-91 D co CCGG 258.820 -999.990 P.C R5 1999 10 06 15 25 00 36.7300 126.1300 21.00 16.00 5.00 136843 TAP 1999 09 03 06 45 00 586-91 D co CCGG 253.930 -999.990 P.C R5 1999 10 06 15 38 00 36.7300 126.1300 21.00 16.00 5.00 136844 TAP 1999 09 10 06 30 00 613-91 D co CCGG 189.650 -999.990 ... R5 1999 10 06 15 52 00 36.7300 126.1300 21.00 16.00 5.00 136845 TAP 1999 09 10 06 30 00 614-91 D co CCGG 189.130 -999.990 ... R5 1999 10 06 16 06 00 36.7300 126.1300 21.00 16.00 5.00 136846 TAP 1999 09 25 05 20 00 205-91 D co CCGG 355.730 -999.990 ..C R5 1999 10 21 13 09 00 36.7300 126.1300 21.00 16.00 5.00 136847 TAP 1999 09 25 05 20 00 206-91 D co CCGG 356.780 -999.990 ..C R5 1999 10 21 13 22 00 36.7300 126.1300 21.00 16.00 5.00 136848 TAP 1999 10 04 06 05 00 1203-91 D co CCGG 256.030 -999.990 ..C R5 1999 10 21 13 36 00 36.7300 126.1300 21.00 16.00 5.00 136849 TAP 1999 10 04 06 05 00 1204-91 D co CCGG 253.800 -999.990 ..C R5 1999 10 21 13 50 00 36.7300 126.1300 21.00 16.00 5.00 136850 TAP 1999 10 15 07 05 00 4195-91 D co CCGG 291.390 -999.990 ..C R5 1999 11 04 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136851 TAP 1999 10 15 07 05 00 4196-91 D co CCGG 291.190 -999.990 ..C R5 1999 11 04 13 00 00 36.7300 126.1300 21.00 16.00 5.00 136852 TAP 1999 10 19 06 20 00 5-91 D co CCGG 324.350 -999.990 ..C R5 1999 11 04 13 14 00 36.7300 126.1300 21.00 16.00 5.00 136853 TAP 1999 10 19 06 20 00 6-91 D co CCGG 324.520 -999.990 ..C R5 1999 11 04 13 28 00 36.7300 126.1300 21.00 16.00 5.00 136854 TAP 1999 10 29 06 20 00 327-91 D co CCGG 145.380 -999.990 ... R5 1999 11 22 09 59 00 36.7300 126.1300 21.00 16.00 5.00 136855 TAP 1999 10 29 06 20 00 328-91 D co CCGG 145.290 -999.990 ... R5 1999 11 22 10 12 00 36.7300 126.1300 21.00 16.00 5.00 136856 TAP 1999 11 02 06 50 00 1429-91 D co CCGG 152.730 -999.990 ... R5 1999 11 22 10 26 00 36.7300 126.1300 21.00 16.00 5.00 136857 TAP 1999 11 02 06 50 00 1430-91 D co CCGG 151.400 -999.990 ... R5 1999 11 22 10 40 00 36.7300 126.1300 21.00 16.00 5.00 136858 TAP 1999 11 16 05 35 00 1025-91 D co CCGG 163.840 -999.990 ... R5 1999 12 20 11 48 00 36.7300 126.1300 21.00 16.00 5.00 136859 TAP 1999 11 16 05 35 00 1026-91 D co CCGG 164.060 -999.990 ... R5 1999 12 20 12 02 00 36.7300 126.1300 21.00 16.00 5.00 136860 TAP 1999 11 23 06 25 00 95-98 D co CCGG 267.850 -999.990 ..C R5 1999 12 20 12 29 00 36.7300 126.1300 21.00 16.00 5.00 136861 TAP 1999 11 23 06 25 00 96-98 D co CCGG 266.260 -999.990 ..C R5 1999 12 20 12 43 00 36.7300 126.1300 21.00 16.00 5.00 136862 TAP 1999 11 25 05 30 00 37-98 D co CCGG 163.470 -999.990 P.. R5 2000 01 04 15 16 00 36.7300 126.1300 21.00 16.00 5.00 136863 TAP 1999 11 25 05 30 00 38-98 D co CCGG 167.170 -999.990 P.. R5 2000 01 04 15 29 00 36.7300 126.1300 21.00 16.00 5.00 136864 TAP 1999 12 06 04 40 00 135-98 D co CCGG 187.040 -999.990 P.. R5 2000 01 04 14 49 00 36.7300 126.1300 21.00 16.00 5.00 136865 TAP 1999 12 06 04 40 00 136-98 D co CCGG 182.000 -999.990 P.. R5 2000 01 04 15 02 00 36.7300 126.1300 21.00 16.00 5.00 136866 TAP 1999 12 09 05 40 00 151-91 D co CCGG 162.770 -999.990 ... R5 2000 02 16 14 47 00 36.7300 126.1300 21.00 16.00 5.00 136867 TAP 1999 12 09 05 40 00 152-91 D co CCGG 162.770 -999.990 ... R5 2000 02 16 15 01 00 36.7300 126.1300 21.00 16.00 5.00 136868 TAP 1999 12 17 05 30 00 59-91 D co CCGG 177.680 -999.990 ... R5 2000 02 16 14 19 00 36.7300 126.1300 21.00 16.00 5.00 136869 TAP 1999 12 17 05 30 00 60-91 D co CCGG 177.560 -999.990 ... R5 2000 02 16 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136870 TAP 1999 12 21 05 00 00 445-91 D co CCGG 224.560 -999.990 ... R5 2000 01 24 12 47 00 36.7300 126.1300 21.00 16.00 5.00 136871 TAP 1999 12 21 05 00 00 446-91 D co CCGG 224.580 -999.990 ... R5 2000 01 24 13 00 00 36.7300 126.1300 21.00 16.00 5.00 136872 TAP 1999 12 29 05 00 00 488-91 D co CCGG 165.390 -999.990 ... R5 2000 01 24 15 05 00 36.7300 126.1300 21.00 16.00 5.00 136873 TAP 2000 01 10 05 00 00 1631-91 D co CCGG 223.750 -999.990 ... R5 2000 02 18 15 36 00 36.7300 126.1300 21.00 16.00 5.00 136874 TAP 2000 01 10 05 00 00 1632-91 D co CCGG 223.900 -999.990 ... R5 2000 02 18 15 50 00 36.7300 126.1300 21.00 16.00 5.00 136875 TAP 2000 01 16 04 50 00 1087-91 D co CCGG 360.900 -999.990 P.C R5 2000 02 18 15 07 00 36.7300 126.1300 21.00 16.00 5.00 136876 TAP 2000 01 16 04 50 00 1088-91 D co CCGG 381.220 -999.990 P.C R5 2000 02 18 15 21 00 36.7300 126.1300 21.00 16.00 5.00 136877 TAP 2000 01 20 04 55 00 39-98 D co CCGG 194.560 -999.990 ... R5 2000 02 08 10 55 00 36.7300 126.1300 21.00 16.00 5.00 136878 TAP 2000 01 20 04 55 00 40-98 D co CCGG 197.540 -999.990 ... R5 2000 02 08 11 09 00 36.7300 126.1300 21.00 16.00 5.00 136879 TAP 2000 01 25 05 05 00 4269-91 D co CCGG 183.910 -999.990 P.. R5 2000 02 08 11 23 00 36.7300 126.1300 21.00 16.00 5.00 136880 TAP 2000 01 25 05 05 00 4270-91 D co CCGG 179.090 -999.990 P.. R5 2000 02 08 11 36 00 36.7300 126.1300 21.00 16.00 5.00 136881 TAP 2000 02 24 05 00 00 1339-91 D co CCGG 245.170 -999.990 ..C R5 2000 03 28 15 31 00 36.7300 126.1300 21.00 16.00 5.00 136882 TAP 2000 02 24 05 00 00 1340-91 D co CCGG 244.780 -999.990 ..C R5 2000 03 28 15 44 00 36.7300 126.1300 21.00 16.00 5.00 136883 TAP 2000 02 28 05 10 00 3-98 D co CCGG 245.660 -999.990 ..C R5 2000 03 28 14 13 00 36.7300 126.1300 21.00 16.00 5.00 136884 TAP 2000 02 28 05 10 00 4-98 D co CCGG 246.280 -999.990 ..C R5 2000 03 28 14 26 00 36.7300 126.1300 21.00 16.00 5.00 136885 TAP 2000 03 06 05 00 00 4952-91 D co CCGG 238.650 -999.990 ..C R5 2000 03 31 15 10 00 36.7300 126.1300 21.00 16.00 5.00 136886 TAP 2000 03 08 04 50 00 4949-91 D co CCGG 224.200 -999.990 ... R5 2000 03 30 09 58 00 36.7300 126.1300 21.00 16.00 5.00 136887 TAP 2000 03 08 04 50 00 4950-91 D co CCGG 223.940 -999.990 ... R5 2000 03 30 10 11 00 36.7300 126.1300 21.00 16.00 5.00 136888 TAP 2000 03 20 05 10 00 1383-91 D co CCGG 337.520 -999.990 ..C R5 2000 04 24 13 12 00 36.7300 126.1300 21.00 16.00 5.00 136889 TAP 2000 03 20 05 10 00 1384-91 D co CCGG 338.530 -999.990 ..C R5 2000 04 24 13 25 00 36.7300 126.1300 21.00 16.00 5.00 136890 TAP 2000 03 29 05 10 00 1969-91 D co CCGG 256.630 -999.990 ..C R5 2000 04 24 13 38 00 36.7300 126.1300 21.00 16.00 5.00 136891 TAP 2000 03 29 05 10 00 1970-91 D co CCGG 256.440 -999.990 ..C R5 2000 04 24 13 51 00 36.7300 126.1300 21.00 16.00 5.00 136892 TAP 2000 04 03 05 50 00 431-91 D co CCGG 256.230 -999.990 ..C R5 2000 05 15 15 48 00 36.7300 126.1300 21.00 16.00 5.00 136893 TAP 2000 04 03 05 50 00 432-91 D co CCGG 256.430 -999.990 ..C R5 2000 05 15 16 01 00 36.7300 126.1300 21.00 16.00 5.00 136894 TAP 2000 04 06 05 10 00 4931-91 D co CCGG 207.180 -999.990 ... R5 2000 05 15 12 55 00 36.7300 126.1300 21.00 16.00 5.00 136895 TAP 2000 04 06 05 10 00 4932-91 D co CCGG 209.180 -999.990 ... R5 2000 05 15 13 08 00 36.7300 126.1300 21.00 16.00 5.00 136896 TAP 2000 04 11 05 30 00 4027-91 D co CCGG 369.910 -999.990 ..C R5 2000 05 23 12 27 00 36.7300 126.1300 21.00 16.00 5.00 136897 TAP 2000 04 11 05 30 00 4028-91 D co CCGG 367.860 -999.990 ..C R5 2000 05 23 12 40 00 36.7300 126.1300 21.00 16.00 5.00 136898 TAP 2000 04 20 05 20 00 4143-91 D co CCGG 291.460 -999.990 P.C R5 2000 05 23 12 01 00 36.7300 126.1300 21.00 16.00 5.00 136899 TAP 2000 04 20 05 20 00 4144-91 D co CCGG 287.540 -999.990 P.C R5 2000 05 23 12 14 00 36.7300 126.1300 21.00 16.00 5.00 136900 TAP 2000 04 24 05 10 00 1709-91 D co CCGG 250.120 -999.990 ..C R5 2000 06 01 12 32 00 36.7300 126.1300 21.00 16.00 5.00 136901 TAP 2000 04 24 05 10 00 1710-91 D co CCGG 250.710 -999.990 ..C R5 2000 06 01 12 45 00 36.7300 126.1300 21.00 16.00 5.00 136902 TAP 2000 05 01 06 50 00 1667-91 D co CCGG -999.990 -999.990 *.. R5 2000 06 01 10 46 00 36.7300 126.1300 21.00 16.00 5.00 136903 TAP 2000 05 01 06 50 00 1668-91 D co CCGG 244.370 -999.990 ..C R5 2000 06 01 10 59 00 36.7300 126.1300 21.00 16.00 5.00 136904 TAP 2000 05 07 06 00 00 4381-91 D co CCGG 204.330 -999.990 ... R5 2000 06 01 13 01 00 36.7300 126.1300 21.00 16.00 5.00 136905 TAP 2000 05 07 06 00 00 4382-91 D co CCGG 203.670 -999.990 ... R5 2000 06 01 13 14 00 36.7300 126.1300 21.00 16.00 5.00 136906 TAP 2000 05 12 04 15 00 1859-91 D co CCGG 310.410 -999.990 ..C R5 2000 06 01 14 19 00 36.7300 126.1300 21.00 16.00 5.00 136907 TAP 2000 05 12 04 15 00 1860-91 D co CCGG 310.860 -999.990 ..C R5 2000 06 01 14 32 00 36.7300 126.1300 21.00 16.00 5.00 136908 TAP 2000 05 16 05 30 00 399-91 D co CCGG 269.750 -999.990 ..C R5 2000 06 15 14 01 00 36.7300 126.1300 21.00 16.00 5.00 136909 TAP 2000 05 16 05 30 00 400-91 D co CCGG 266.870 -999.990 ..C R5 2000 06 15 14 14 00 36.7300 126.1300 21.00 16.00 5.00 136910 TAP 2000 05 21 05 40 00 1843-91 D co CCGG 196.920 -999.990 ... R5 2000 06 28 09 05 00 36.7300 126.1300 21.00 16.00 5.00 136911 TAP 2000 05 21 05 40 00 1844-91 D co CCGG 197.530 -999.990 ... R5 2000 06 28 09 18 00 36.7300 126.1300 21.00 16.00 5.00 136912 TAP 2000 05 22 06 05 00 4959-91 D co CCGG 303.260 -999.990 ..C R5 2000 06 15 12 42 00 36.7300 126.1300 21.00 16.00 5.00 136913 TAP 2000 05 22 06 05 00 518-91 D co CCGG 303.490 -999.990 ..C R5 2000 06 15 12 55 00 36.7300 126.1300 21.00 16.00 5.00 136914 TAP 2000 06 13 05 50 00 965-91 D co CCGG 333.410 -999.990 ..C R5 2000 06 28 09 31 00 36.7300 126.1300 21.00 16.00 5.00 136915 TAP 2000 06 13 05 50 00 966-91 D co CCGG 333.340 -999.990 ..C R5 2000 06 28 09 44 00 36.7300 126.1300 21.00 16.00 5.00 136916 TAP 2000 06 19 06 30 00 287-91 D co CCGG 178.020 -999.990 ... R5 2000 07 19 11 02 00 36.7300 126.1300 21.00 16.00 5.00 136917 TAP 2000 06 19 06 30 00 288-91 D co CCGG 176.420 -999.990 ... R5 2000 07 19 11 15 00 36.7300 126.1300 21.00 16.00 5.00 136918 TAP 2000 06 30 05 40 00 1357-91 D co CCGG 305.690 -999.990 P.C R5 2000 07 19 11 28 00 36.7300 126.1300 21.00 16.00 5.00 136919 TAP 2000 06 30 05 40 00 1358-91 D co CCGG 301.730 -999.990 P.C R5 2000 07 19 11 41 00 36.7300 126.1300 21.00 16.00 5.00 136920 TAP 2000 07 05 05 30 00 251-91 D co CCGG 172.670 -999.990 ... R5 2000 08 01 10 35 00 36.7300 126.1300 21.00 16.00 5.00 136921 TAP 2000 07 05 05 30 00 252-91 D co CCGG 173.590 -999.990 ... R5 2000 08 01 10 48 00 36.7300 126.1300 21.00 16.00 5.00 136922 TAP 2000 07 10 05 10 00 155-91 D co CCGG 267.040 -999.990 ..C R5 2000 08 01 11 01 00 36.7300 126.1300 21.00 16.00 5.00 136923 TAP 2000 07 10 05 10 00 156-91 D co CCGG 270.270 -999.990 ..C R5 2000 08 01 11 14 00 36.7300 126.1300 21.00 16.00 5.00 136924 TAP 2000 07 12 05 40 00 431-91 D co CCGG 416.190 -999.990 .XC R5 2000 08 28 11 03 00 36.7300 126.1300 21.00 16.00 5.00 136925 TAP 2000 07 12 05 40 00 432-91 D co CCGG 420.640 -999.990 .XC R5 2000 08 28 11 16 00 36.7300 126.1300 21.00 16.00 5.00 136926 TAP 2000 07 18 06 20 00 621-91 D co CCGG 113.350 -999.990 ... R5 2000 08 28 11 55 00 36.7300 126.1300 21.00 16.00 5.00 136927 TAP 2000 07 18 06 20 00 622-91 D co CCGG 112.510 -999.990 ... R5 2000 08 28 12 08 00 36.7300 126.1300 21.00 16.00 5.00 136928 TAP 2000 07 21 05 40 00 4177-91 D co CCGG 138.830 -999.990 ... R5 2000 08 15 14 08 00 36.7300 126.1300 21.00 16.00 5.00 136929 TAP 2000 07 21 05 40 00 4178-91 D co CCGG 138.270 -999.990 ... R5 2000 08 15 14 21 00 36.7300 126.1300 21.00 16.00 5.00 136930 TAP 2000 07 24 06 30 00 1037-91 D co CCGG 410.340 -999.990 .XC R5 2000 08 15 13 42 00 36.7300 126.1300 21.00 16.00 5.00 136931 TAP 2000 07 24 06 30 00 1038-91 D co CCGG 410.870 -999.990 .XC R5 2000 08 15 13 55 00 36.7300 126.1300 21.00 16.00 5.00 136932 TAP 2000 08 02 06 20 00 4491-91 D co CCGG 449.950 -999.990 P.C R5 2000 09 07 13 39 00 36.7300 126.1300 21.00 16.00 5.00 136933 TAP 2000 08 02 06 20 00 4492-91 D co CCGG 461.550 -999.990 P.C R5 2000 09 07 13 52 00 36.7300 126.1300 21.00 16.00 5.00 136934 TAP 2000 08 10 06 00 00 75-98 D co CCGG 167.910 -999.990 ... R5 2000 09 07 14 05 00 36.7300 126.1300 21.00 16.00 5.00 136935 TAP 2000 08 10 06 00 00 76-98 D co CCGG 167.970 -999.990 ... R5 2000 09 07 14 18 00 36.7300 126.1300 21.00 16.00 5.00 136936 TAP 2000 08 17 05 30 00 1083-91 D co CCGG 207.390 -999.990 P.. R5 2000 09 21 12 49 00 36.7300 126.1300 21.00 16.00 5.00 136937 TAP 2000 08 17 05 30 00 1084-91 D co CCGG 190.840 -999.990 P.. R5 2000 09 21 13 02 00 36.7300 126.1300 21.00 16.00 5.00 136938 TAP 2000 08 22 06 00 00 1731-91 D co CCGG 175.160 -999.990 ... R5 2000 09 21 12 23 00 36.7300 126.1300 21.00 16.00 5.00 136939 TAP 2000 08 22 06 00 00 1732-91 D co CCGG 175.690 -999.990 ... R5 2000 09 21 12 36 00 36.7300 126.1300 21.00 16.00 5.00 136940 TAP 2000 08 28 05 40 00 1329-91 D co CCGG 93.220 -999.990 ... R5 2000 10 04 14 49 00 36.7300 126.1300 21.00 16.00 5.00 136941 TAP 2000 08 28 05 40 00 1330-91 D co CCGG 91.590 -999.990 ... R5 2000 10 04 15 02 00 36.7300 126.1300 21.00 16.00 5.00 136942 TAP 2000 09 05 05 20 00 4741-91 D co CCGG 156.920 -999.990 ... R5 2000 10 04 15 15 00 36.7300 126.1300 21.00 16.00 5.00 136943 TAP 2000 09 05 05 20 00 4742-91 D co CCGG 157.700 -999.990 ... R5 2000 10 04 15 28 00 36.7300 126.1300 21.00 16.00 5.00 136944 TAP 2000 09 18 05 10 00 4679-91 D co CCGG 163.550 -999.990 ... R5 2000 10 17 13 06 00 36.7300 126.1300 21.00 16.00 5.00 136945 TAP 2000 09 18 05 10 00 4680-91 D co CCGG 162.600 -999.990 ... R5 2000 10 17 13 19 00 36.7300 126.1300 21.00 16.00 5.00 136946 TAP 2000 09 21 05 30 00 4621-91 D co CCGG 214.510 -999.990 P.. R5 2000 10 17 13 32 00 36.7300 126.1300 21.00 16.00 5.00 136947 TAP 2000 09 21 05 30 00 4622-91 D co CCGG 209.700 -999.990 P.. R5 2000 10 17 13 45 00 36.7300 126.1300 21.00 16.00 5.00 136948 TAP 2000 09 25 05 10 00 1113-91 D co CCGG 198.980 -999.990 ... R5 2000 10 12 13 10 00 36.7300 126.1300 21.00 16.00 5.00 136949 TAP 2000 09 25 05 10 00 1114-91 D co CCGG 200.860 -999.990 ... R5 2000 10 12 13 23 00 36.7300 126.1300 21.00 16.00 5.00 136950 TAP 2000 10 04 04 50 00 621-91 D co CCGG 179.400 -999.990 ... R5 2000 10 27 12 51 00 36.7300 126.1300 21.00 16.00 5.00 136951 TAP 2000 10 04 04 50 00 622-91 D co CCGG 177.030 -999.990 ... R5 2000 10 27 13 04 00 36.7300 126.1300 21.00 16.00 5.00 136952 TAP 2000 10 09 06 15 00 1275-91 D co CCGG 301.670 -999.990 P.C R5 2000 10 27 12 25 00 36.7300 126.1300 21.00 16.00 5.00 136953 TAP 2000 10 09 06 15 00 1276-91 D co CCGG 305.880 -999.990 P.C R5 2000 10 27 12 38 00 36.7300 126.1300 21.00 16.00 5.00 136954 TAP 2000 10 12 05 30 00 1579-91 D co CCGG 121.970 -999.990 P.. R5 2000 11 16 09 14 00 36.7300 126.1300 21.00 16.00 5.00 136955 TAP 2000 10 12 05 30 00 1580-91 D co CCGG 117.530 -999.990 P.. R5 2000 11 16 09 27 00 36.7300 126.1300 21.00 16.00 5.00 136956 TAP 2000 10 25 05 50 00 4617-91 D co CCGG 151.340 -999.990 ... R5 2000 11 16 09 42 00 36.7300 126.1300 21.00 16.00 5.00 136957 TAP 2000 10 25 05 50 00 4618-91 D co CCGG 151.180 -999.990 ... R5 2000 11 16 09 55 00 36.7300 126.1300 21.00 16.00 5.00 136958 TAP 2000 11 02 06 00 00 4275-91 D co CCGG 280.150 -999.990 ..C R5 2000 11 27 15 16 00 36.7300 126.1300 21.00 16.00 5.00 136959 TAP 2000 11 02 06 00 00 4276-91 D co CCGG 279.410 -999.990 ..C R5 2000 11 27 15 29 00 36.7300 126.1300 21.00 16.00 5.00 136960 TAP 2000 11 07 04 30 00 1171-91 D co CCGG 184.480 -999.990 ... R5 2000 11 28 10 04 00 36.7300 126.1300 21.00 16.00 5.00 136961 TAP 2000 11 07 04 30 00 1351-91 D co CCGG 184.070 -999.990 ... R5 2000 11 28 10 17 00 36.7300 126.1300 21.00 16.00 5.00 136962 TAP 2000 11 14 05 30 00 4091-91 D co CCGG 327.470 -999.990 .XC R5 2000 12 18 11 06 00 36.7300 126.1300 21.00 16.00 5.00 136963 TAP 2000 11 14 05 30 00 4092-91 D co CCGG 327.810 -999.990 .XC R5 2000 12 18 11 19 00 36.7300 126.1300 21.00 16.00 5.00 136964 TAP 2000 11 21 06 20 00 767-91 D co CCGG 148.030 -999.990 ... R5 2000 12 18 11 32 00 36.7300 126.1300 21.00 16.00 5.00 136965 TAP 2000 11 21 06 20 00 768-91 D co CCGG 147.230 -999.990 ... R5 2000 12 18 11 45 00 36.7300 126.1300 21.00 16.00 5.00 136966 TAP 2000 11 27 05 10 00 4273-91 D co CCGG 162.090 -999.990 ... R5 2000 12 26 13 43 00 36.7300 126.1300 21.00 16.00 5.00 136967 TAP 2000 11 27 05 10 00 4274-91 D co CCGG 162.350 -999.990 ... R5 2000 12 26 13 57 00 36.7300 126.1300 21.00 16.00 5.00 136968 TAP 2000 12 04 05 30 00 211-91 D co CCGG 170.340 -999.990 ... R5 2000 12 26 14 11 00 36.7300 126.1300 21.00 16.00 5.00 136969 TAP 2000 12 04 05 30 00 212-91 D co CCGG 171.010 -999.990 ... R5 2000 12 26 14 25 00 36.7300 126.1300 21.00 16.00 5.00 136970 TAP 2000 12 11 05 10 00 61-98 D co CCGG 167.580 -999.990 ... R5 2001 01 12 09 53 00 36.7300 126.1300 21.00 16.00 5.00 136971 TAP 2000 12 11 05 10 00 62-98 D co CCGG 166.700 -999.990 ... R5 2001 01 12 10 06 00 36.7300 126.1300 21.00 16.00 5.00 136972 TAP 2000 12 22 05 30 00 139-98 D co CCGG 230.540 -999.990 ..C R5 2001 01 17 09 12 00 36.7300 126.1300 21.00 16.00 5.00 136973 TAP 2000 12 22 05 30 00 140-98 D co CCGG 233.380 -999.990 ..C R5 2001 01 17 09 25 00 36.7300 126.1300 21.00 16.00 5.00 136974 TAP 2001 01 15 05 00 00 4649-91 D co CCGG 186.150 -999.990 ... R5 2001 02 14 14 45 00 36.7300 126.1300 21.00 16.00 5.00 136975 TAP 2001 01 27 03 50 00 91-98 D co CCGG 199.440 -999.990 ... R5 2001 02 13 15 01 00 36.7300 126.1300 21.00 16.00 5.00 136976 TAP 2001 01 27 03 50 00 92-98 D co CCGG 200.450 -999.990 ... R5 2001 02 13 16 01 00 36.7300 126.1300 21.00 16.00 5.00 136977 TAP 2001 01 29 05 30 00 819-91 D co CCGG 212.360 -999.990 ... R5 2001 02 28 12 03 00 36.7300 126.1300 21.00 16.00 5.00 136978 TAP 2001 01 29 05 30 00 820-91 D co CCGG 211.700 -999.990 ... R5 2001 02 28 12 17 00 36.7300 126.1300 21.00 16.00 5.00 136979 TAP 2001 02 08 04 30 00 100-91 D co CCGG 207.730 -999.990 ... R5 2001 02 28 11 50 00 36.7300 126.1300 21.00 16.00 5.00 136980 TAP 2001 02 08 04 30 00 99-91 D co CCGG 208.040 -999.990 ... R5 2001 02 28 11 37 00 36.7300 126.1300 21.00 16.00 5.00 136981 TAP 2001 02 16 05 10 00 4713-91 D co CCGG 179.430 -999.990 ... R5 2001 03 21 11 12 00 36.7300 126.1300 21.00 16.00 5.00 136982 TAP 2001 02 16 05 10 00 4714-91 D co CCGG 177.030 -999.990 ... R5 2001 03 21 11 25 00 36.7300 126.1300 21.00 16.00 5.00 136983 TAP 2001 02 28 05 10 00 4093-91 D co CCGG 348.000 -999.990 ..C R5 2001 03 21 10 46 00 36.7300 126.1300 21.00 16.00 5.00 136984 TAP 2001 02 28 05 10 00 4094-91 D co CCGG 346.780 -999.990 ..C R5 2001 03 21 10 59 00 36.7300 126.1300 21.00 16.00 5.00 136985 TAP 2001 03 05 05 15 00 467-91 D co CCGG 269.440 -999.990 ..C R5 2001 04 05 10 39 00 36.7300 126.1300 21.00 16.00 5.00 136986 TAP 2001 03 05 05 15 00 468-91 D co CCGG 267.880 -999.990 ..C R5 2001 04 05 10 52 00 36.7300 126.1300 21.00 16.00 5.00 136987 TAP 2001 03 10 04 10 00 1941-91 D co CCGG 310.750 -999.990 P.C R5 2001 04 05 10 13 00 36.7300 126.1300 21.00 16.00 5.00 136988 TAP 2001 03 10 04 10 00 1942-91 D co CCGG 314.620 -999.990 P.C R5 2001 04 05 10 26 00 36.7300 126.1300 21.00 16.00 5.00 136989 TAP 2001 03 13 05 00 00 611-91 D co CCGG 274.620 -999.990 ..C R5 2001 04 11 11 55 00 36.7300 126.1300 21.00 16.00 5.00 136990 TAP 2001 03 13 05 00 00 612-91 D co CCGG 275.230 -999.990 ..C R5 2001 04 11 12 08 00 36.7300 126.1300 21.00 16.00 5.00 136991 TAP 2001 03 23 05 50 00 1915-91 D co CCGG 312.750 -999.990 ..C R5 2001 04 11 11 29 00 36.7300 126.1300 21.00 16.00 5.00 136992 TAP 2001 03 23 05 50 00 1916-91 D co CCGG 309.680 -999.990 ..C R5 2001 04 11 11 42 00 36.7300 126.1300 21.00 16.00 5.00 136993 TAP 2001 03 25 07 10 00 2039-91 D co CCGG 302.650 -999.990 ..C R5 2001 04 20 14 18 00 36.7300 126.1300 21.00 16.00 5.00 136994 TAP 2001 03 25 07 10 00 2040-91 D co CCGG 302.560 -999.990 ..C R5 2001 04 20 14 31 00 36.7300 126.1300 21.00 16.00 5.00 136995 TAP 2001 03 26 07 00 00 27-91 D co CCGG 215.310 -999.990 P.. R5 2001 04 20 13 52 00 36.7300 126.1300 21.00 16.00 5.00 136996 TAP 2001 03 26 07 00 00 28-91 D co CCGG 219.330 -999.990 P.. R5 2001 04 20 14 05 00 36.7300 126.1300 21.00 16.00 5.00 136997 TAP 2001 03 28 05 45 00 1155-91 D co CCGG 237.270 -999.990 ..C R5 2001 04 17 09 25 00 36.7300 126.1300 21.00 16.00 5.00 136998 TAP 2001 03 28 05 45 00 1156-91 D co CCGG 238.000 -999.990 ..C R5 2001 04 17 09 38 00 36.7300 126.1300 21.00 16.00 5.00 136999 TAP 2001 03 31 03 20 00 1501-91 D co CCGG 274.400 -999.990 P.C R5 2001 04 17 09 51 00 36.7300 126.1300 21.00 16.00 5.00 137000 TAP 2001 03 31 03 20 00 1502-91 D co CCGG 278.550 -999.990 P.C R5 2001 04 17 10 04 00 36.7300 126.1300 21.00 16.00 5.00 137001 TAP 2001 04 02 06 05 00 1141-91 D co CCGG 230.370 -999.990 ..C R5 2001 04 23 11 53 00 36.7300 126.1300 21.00 16.00 5.00 137002 TAP 2001 04 02 06 05 00 1142-91 D co CCGG 228.340 -999.990 ... R5 2001 04 23 12 06 00 36.7300 126.1300 21.00 16.00 5.00 137003 TAP 2001 04 04 04 46 00 1257-91 D co CCGG 228.340 -999.990 ... R5 2001 04 19 13 19 00 36.7300 126.1300 21.00 16.00 5.00 137004 TAP 2001 04 04 04 46 00 1258-91 D co CCGG 227.960 -999.990 ... R5 2001 04 19 13 32 00 36.7300 126.1300 21.00 16.00 5.00 137005 TAP 2001 04 05 04 50 00 1231-91 D co CCGG 253.370 -999.990 ..C R5 2001 04 26 13 12 00 36.7300 126.1300 21.00 16.00 5.00 137006 TAP 2001 04 05 04 50 00 1232-91 D co CCGG 255.080 -999.990 ..C R5 2001 04 26 13 25 00 36.7300 126.1300 21.00 16.00 5.00 137007 TAP 2001 04 12 06 06 00 4031-91 D co CCGG 285.690 -999.990 ..C R5 2001 04 26 11 26 00 36.7300 126.1300 21.00 16.00 5.00 137008 TAP 2001 04 12 06 06 00 4032-91 D co CCGG 284.210 -999.990 ..C R5 2001 04 26 11 39 00 36.7300 126.1300 21.00 16.00 5.00 137009 TAP 2001 04 13 03 25 00 73-98 D co CCGG 288.050 -999.990 ..C R5 2001 04 26 12 18 00 36.7300 126.1300 21.00 16.00 5.00 137010 TAP 2001 04 13 03 25 00 74-98 D co CCGG 287.930 -999.990 ..C R5 2001 04 26 12 31 00 36.7300 126.1300 21.00 16.00 5.00 137011 TAP 2001 04 15 05 15 00 1309-91 D co CCGG 292.620 -999.990 ..C R5 2001 04 26 10 19 00 36.7300 126.1300 21.00 16.00 5.00 137012 TAP 2001 04 15 05 15 00 1310-91 D co CCGG 294.100 -999.990 ..C R5 2001 04 26 10 05 00 36.7300 126.1300 21.00 16.00 5.00 137013 TAP 2001 04 16 07 00 00 45-91 D co CCGG 184.520 -999.990 ... R5 2001 05 02 12 47 00 36.7300 126.1300 21.00 16.00 5.00 137014 TAP 2001 04 16 07 00 00 46-91 D co CCGG 184.870 -999.990 ... R5 2001 05 02 13 00 00 36.7300 126.1300 21.00 16.00 5.00 137015 TAP 2001 04 17 05 40 00 4545-91 D co CCGG 193.460 -999.990 P.. R5 2001 05 09 14 34 00 36.7300 126.1300 21.00 16.00 5.00 137016 TAP 2001 04 17 05 40 00 4546-91 D co CCGG 196.910 -999.990 P.. R5 2001 05 09 14 47 00 36.7300 126.1300 21.00 16.00 5.00 137017 TAP 2001 04 18 06 10 00 667-91 D co CCGG 201.680 -999.990 ... R5 2001 05 09 15 00 00 36.7300 126.1300 21.00 16.00 5.00 137018 TAP 2001 04 18 06 10 00 668-91 D co CCGG 200.820 -999.990 ... R5 2001 05 09 15 13 00 36.7300 126.1300 21.00 16.00 5.00 137019 TAP 2001 04 20 05 10 00 2053-91 D co CCGG 336.250 -999.990 ..C R5 2001 05 02 13 39 00 36.7300 126.1300 21.00 16.00 5.00 137020 TAP 2001 04 20 05 10 00 2054-91 D co CCGG 336.230 -999.990 ..C R5 2001 05 02 13 52 00 36.7300 126.1300 21.00 16.00 5.00 137021 TAP 2001 04 26 05 52 00 335-99 D co CCGG 288.710 -999.990 ..C R5 2001 05 21 11 13 00 36.7300 126.1300 21.00 16.00 5.00 137022 TAP 2001 04 26 05 52 00 336-99 D co CCGG 288.090 -999.990 ..C R5 2001 05 21 11 26 00 36.7300 126.1300 21.00 16.00 5.00 137023 TAP 2001 04 30 06 40 00 545-91 D co CCGG 237.930 -999.990 P.C R5 2001 05 21 10 47 00 36.7300 126.1300 21.00 16.00 5.00 137024 TAP 2001 04 30 06 40 00 546-91 D co CCGG 549.310 -999.990 P.C R5 2001 05 21 11 00 00 36.7300 126.1300 21.00 16.00 5.00 137025 TAP 2001 05 02 05 30 00 371-99 D co CCGG 240.070 -999.990 ..C R5 2001 05 29 14 31 00 36.7300 126.1300 21.00 16.00 5.00 137026 TAP 2001 05 02 05 55 00 337-99 D co CCGG 241.260 -999.990 ..C R5 2001 05 29 09 12 00 36.7300 126.1300 21.00 16.00 5.00 137027 TAP 2001 05 02 05 55 00 338-99 D co CCGG 239.400 -999.990 ..C R5 2001 05 29 09 25 00 36.7300 126.1300 21.00 16.00 5.00 137028 TAP 2001 05 06 06 15 00 181-99 D co CCGG 229.250 -999.990 ..C R5 2001 06 01 11 13 00 36.7300 126.1300 21.00 16.00 5.00 137029 TAP 2001 05 06 06 15 00 182-99 D co CCGG 231.650 -999.990 ..C R5 2001 06 01 11 26 00 36.7300 126.1300 21.00 16.00 5.00 137030 TAP 2001 05 07 06 30 00 165-99 D co CCGG 192.530 -999.990 ... R5 2001 06 01 10 46 00 36.7300 126.1300 21.00 16.00 5.00 137031 TAP 2001 05 07 06 30 00 166-99 D co CCGG 192.390 -999.990 ... R5 2001 06 01 10 59 00 36.7300 126.1300 21.00 16.00 5.00 137032 TAP 2001 05 08 08 50 00 149-91 D co CCGG 325.400 -999.990 ..C R5 2001 05 24 14 34 00 36.7300 126.1300 21.00 16.00 5.00 137033 TAP 2001 05 08 08 50 00 150-91 D co CCGG 326.740 -999.990 ..C R5 2001 05 24 14 47 00 36.7300 126.1300 21.00 16.00 5.00 137034 TAP 2001 05 08 08 50 00 150-91 D co CCGG 326.440 -999.990 ..C R5 2001 05 24 15 02 00 36.7300 126.1300 21.00 16.00 5.00 137034 TAP 2001 05 10 02 55 00 1913-91 D co CCGG 316.620 -999.990 ..C R5 2001 05 25 12 06 00 36.7300 126.1300 21.00 16.00 5.00 137035 TAP 2001 05 10 02 55 00 1914-91 D co CCGG 315.310 -999.990 ..C R5 2001 05 25 12 19 00 36.7300 126.1300 21.00 16.00 5.00 137036 TAP 2001 05 17 04 50 00 593-91 D co CCGG 245.220 -999.990 ..C R5 2001 06 25 13 47 00 36.7300 126.1300 21.00 16.00 5.00 137037 TAP 2001 05 17 04 50 00 594-91 D co CCGG 244.500 -999.990 ..C R5 2001 06 25 14 00 00 36.7300 126.1300 21.00 16.00 5.00 137038 TAP 2001 05 21 05 50 00 4511-91 D co CCGG 189.910 -999.990 ... R5 2001 06 25 14 13 00 36.7300 126.1300 21.00 16.00 5.00 137039 TAP 2001 05 21 05 50 00 4512-91 D co CCGG 188.270 -999.990 ... R5 2001 06 25 14 27 00 36.7300 126.1300 21.00 16.00 5.00 137040 TAP 2001 05 28 05 30 00 4107-91 D co CCGG 242.350 -999.990 ..C R5 2001 06 27 12 48 00 36.7300 126.1300 21.00 16.00 5.00 137041 TAP 2001 05 28 05 30 00 4108-91 D co CCGG 242.930 -999.990 ..C R5 2001 06 27 13 01 00 36.7300 126.1300 21.00 16.00 5.00 137042 TAP 2001 06 08 05 00 00 2049-91 D co CCGG 227.560 -999.990 ... R5 2001 06 27 13 16 00 36.7300 126.1300 21.00 16.00 5.00 137043 TAP 2001 06 08 05 00 00 2050-91 D co CCGG 228.430 -999.990 ... R5 2001 06 27 13 29 00 36.7300 126.1300 21.00 16.00 5.00 137044 TAP 2001 06 20 05 20 00 1777-91 D co CCGG 238.950 -999.990 ..C R5 2001 07 26 13 33 00 36.7300 126.1300 21.00 16.00 5.00 137045 TAP 2001 06 20 05 20 00 1778-91 D co CCGG 239.660 -999.990 ..C R5 2001 07 26 13 46 00 36.7300 126.1300 21.00 16.00 5.00 137046 TAP 2001 06 25 05 10 00 653-91 D co CCGG 218.910 -999.990 ... R5 2001 07 26 13 05 00 36.7300 126.1300 21.00 16.00 5.00 137047 TAP 2001 06 25 05 10 00 654-91 D co CCGG 221.040 -999.990 ... R5 2001 07 26 13 19 00 36.7300 126.1300 21.00 16.00 5.00 137048 TAP 2001 06 27 05 10 00 4985-91 D co CCGG 136.620 -999.990 ... R5 2001 07 23 12 35 00 36.7300 126.1300 21.00 16.00 5.00 137049 TAP 2001 06 27 05 10 00 4986-91 D co CCGG 135.750 -999.990 ... R5 2001 07 23 12 48 00 36.7300 126.1300 21.00 16.00 5.00 137050 TAP 2001 07 02 05 30 00 1961-91 D co CCGG 86.630 -999.990 ... R5 2001 07 25 13 12 00 36.7300 126.1300 21.00 16.00 5.00 137051 TAP 2001 07 02 05 30 00 1962-91 D co CCGG 86.050 -999.990 ... R5 2001 07 25 13 25 00 36.7300 126.1300 21.00 16.00 5.00 137052 TAP 2001 07 09 05 30 00 161-98 D co CCGG 117.960 -999.990 P.. R5 2001 07 30 15 53 00 36.7300 126.1300 21.00 16.00 5.00 137053 TAP 2001 07 09 05 30 00 162-98 D co CCGG 121.620 -999.990 P.. R5 2001 07 30 16 06 00 36.7300 126.1300 21.00 16.00 5.00 137054 TAP 2001 07 13 06 00 00 451-91 D co CCGG -999.990 -999.990 *.. R5 2001 07 30 16 19 00 36.7300 126.1300 21.00 16.00 5.00 137055 TAP 2001 07 13 06 00 00 452-91 D co CCGG 208.410 -999.990 ... R5 2001 07 30 16 32 00 36.7300 126.1300 21.00 16.00 5.00 137056 TAP 2001 07 16 05 40 00 10-98 D co CCGG 265.210 -999.990 P.C R5 2001 08 17 12 59 00 36.7300 126.1300 21.00 16.00 5.00 137057 TAP 2001 07 16 05 40 00 9-98 D co CCGG 261.470 -999.990 P.C R5 2001 08 17 12 46 00 36.7300 126.1300 21.00 16.00 5.00 137058 TAP 2001 07 19 06 30 00 1035-91 D co CCGG 279.430 -999.990 ..C R5 2001 08 17 14 07 00 36.7300 126.1300 21.00 16.00 5.00 137059 TAP 2001 07 19 06 30 00 1036-91 D co CCGG 280.760 -999.990 ..C R5 2001 08 17 14 20 00 36.7300 126.1300 21.00 16.00 5.00 137060 TAP 2001 07 26 05 50 00 335-91 D co CCGG 88.540 -999.990 ... R5 2001 08 21 10 17 00 36.7300 126.1300 21.00 16.00 5.00 137061 TAP 2001 07 26 05 50 00 336-91 D co CCGG 88.180 -999.990 ... R5 2001 08 21 10 30 00 36.7300 126.1300 21.00 16.00 5.00 137062 TAP 2001 08 01 06 30 00 538-91 D co CCGG 116.560 -999.990 ... R5 2001 08 20 18 07 00 36.7300 126.1300 21.00 16.00 5.00 137063 TAP 2001 08 06 05 50 00 1191-91 D co CCGG 236.290 -999.990 ..C R5 2002 02 12 14 16 00 36.7300 126.1300 21.00 16.00 5.00 137064 TAP 2001 08 06 05 50 00 1192-91 D co CCGG 237.190 -999.990 ..C R5 2002 02 12 14 29 00 36.7300 126.1300 21.00 16.00 5.00 137065 TAP 2001 08 16 05 40 00 1417-91 D co CCGG 114.440 -999.990 P.. R5 2002 02 12 13 24 00 36.7300 126.1300 21.00 16.00 5.00 137066 TAP 2001 08 16 05 40 00 1418-91 D co CCGG 104.540 -999.990 P.. R5 2002 02 12 13 37 00 36.7300 126.1300 21.00 16.00 5.00 137067 TAP 2001 08 24 06 00 00 1567-91 D co CCGG 166.300 -999.990 ... R5 2001 09 14 15 51 00 36.7300 126.1300 21.00 16.00 5.00 137068 TAP 2001 08 24 06 00 00 1568-91 D co CCGG 164.250 -999.990 ... R5 2001 09 14 16 04 00 36.7300 126.1300 21.00 16.00 5.00 137069 TAP 2001 08 27 05 40 00 4319-91 D co CCGG 174.850 -999.990 ... R5 2001 09 14 15 24 00 36.7300 126.1300 21.00 16.00 5.00 137070 TAP 2001 08 27 05 40 00 4320-91 D co CCGG 176.150 -999.990 ... R5 2001 09 14 15 37 00 36.7300 126.1300 21.00 16.00 5.00 137071 TAP 2001 08 30 07 30 00 4339-91 D co CCGG 141.610 -999.990 ... R5 2001 10 04 12 33 00 36.7300 126.1300 21.00 16.00 5.00 137072 TAP 2001 08 30 07 30 00 4340-91 D co CCGG 143.440 -999.990 ... R5 2001 10 04 12 46 00 36.7300 126.1300 21.00 16.00 5.00 137073 TAP 2001 09 11 05 40 00 1143-91 D co CCGG 138.040 -999.990 ... R5 2001 10 04 11 41 00 36.7300 126.1300 21.00 16.00 5.00 137074 TAP 2001 09 11 05 40 00 1144-91 D co CCGG 138.230 -999.990 ... R5 2001 10 04 11 54 00 36.7300 126.1300 21.00 16.00 5.00 137075 TAP 2001 09 15 03 40 00 4029-91 D co CCGG 129.350 -999.990 ... R5 2002 01 15 12 18 00 36.7300 126.1300 21.00 16.00 5.00 137076 TAP 2001 09 15 03 40 00 4030-91 D co CCGG 129.600 -999.990 ... R5 2002 01 15 12 31 00 36.7300 126.1300 21.00 16.00 5.00 137077 TAP 2001 09 19 05 00 00 1163-91 D co CCGG 231.710 -999.990 ..C R5 2002 01 15 11 52 00 36.7300 126.1300 21.00 16.00 5.00 137078 TAP 2001 09 19 05 00 00 1164-91 D co CCGG 230.600 -999.990 ..C R5 2002 01 15 12 05 00 36.7300 126.1300 21.00 16.00 5.00 137079 TAP 2001 09 25 05 10 00 4967-91 D co CCGG 299.050 -999.990 ..C R5 2001 11 23 14 27 00 36.7300 126.1300 21.00 16.00 5.00 137080 TAP 2001 09 25 05 10 00 4968-91 D co CCGG 301.040 -999.990 ..C R5 2001 11 23 14 40 00 36.7300 126.1300 21.00 16.00 5.00 137081 TAP 2001 09 28 06 30 00 185-98 D co CCGG 211.870 -999.990 P.. R5 2001 11 23 11 20 00 36.7300 126.1300 21.00 16.00 5.00 137082 TAP 2001 09 28 06 30 00 186-98 D co CCGG 215.760 -999.990 P.. R5 2001 11 23 11 33 00 36.7300 126.1300 21.00 16.00 5.00 137083 TAP 2001 10 05 05 30 00 324-99 D co CCGG 155.450 -999.990 ... R5 2001 11 14 12 50 00 36.7300 126.1300 21.00 16.00 5.00 137084 TAP 2001 10 05 05 30 00 325-99 D co CCGG 155.900 -999.990 ... R5 2001 11 14 13 03 00 36.7300 126.1300 21.00 16.00 5.00 137085 TAP 2001 10 11 07 06 00 323-99 D co CCGG 171.820 -999.990 ... R5 2001 11 14 13 31 00 36.7300 126.1300 21.00 16.00 5.00 137086 TAP 2001 10 11 07 06 00 326-99 D co CCGG 169.010 -999.990 ... R5 2001 11 14 13 44 00 36.7300 126.1300 21.00 16.00 5.00 137087 TAP 2001 10 17 07 30 00 4501-91 D co CCGG 132.740 -999.990 ... R5 2001 11 23 15 47 00 36.7300 126.1300 21.00 16.00 5.00 137088 TAP 2001 10 17 07 30 00 4502-91 D co CCGG 132.910 -999.990 ... R5 2001 11 23 16 00 00 36.7300 126.1300 21.00 16.00 5.00 137089 TAP 2001 10 25 05 10 00 351-99 D co CCGG 447.610 -999.990 .XC R5 2001 11 23 16 13 00 36.7300 126.1300 21.00 16.00 5.00 137090 TAP 2001 10 25 05 10 00 352-99 D co CCGG 449.740 -999.990 .XC R5 2001 11 23 16 26 00 36.7300 126.1300 21.00 16.00 5.00 137091 TAP 2001 10 30 05 00 00 4905-91 D co CCGG 268.790 -999.990 P.C R5 2001 11 20 13 52 00 36.7300 126.1300 21.00 16.00 5.00 137092 TAP 2001 10 30 05 00 00 4906-91 D co CCGG 265.430 -999.990 P.C R5 2001 11 20 14 05 00 36.7300 126.1300 21.00 16.00 5.00 137093 TAP 2001 11 01 04 50 00 4883-91 D co CCGG 135.580 -999.990 ... R5 2001 11 20 13 26 00 36.7300 126.1300 21.00 16.00 5.00 137094 TAP 2001 11 01 04 50 00 4884-91 D co CCGG 136.530 -999.990 ... R5 2001 11 20 13 39 00 36.7300 126.1300 21.00 16.00 5.00 137095 TAP 2001 11 08 05 00 00 4761-91 D co CCGG 194.440 -999.990 ... R5 2001 12 14 12 11 00 36.7300 126.1300 21.00 16.00 5.00 137096 TAP 2001 11 08 05 00 00 4762-91 D co CCGG 195.530 -999.990 ... R5 2001 12 14 12 25 00 36.7300 126.1300 21.00 16.00 5.00 137097 TAP 2001 11 12 05 30 00 1659-91 D co CCGG 163.030 -999.990 ... R5 2001 12 14 13 40 00 36.7300 126.1300 21.00 16.00 5.00 137098 TAP 2001 11 12 05 30 00 1660-91 D co CCGG 164.590 -999.990 ... R5 2001 12 14 13 53 00 36.7300 126.1300 21.00 16.00 5.00 137099 TAP 2001 11 26 04 50 00 4463-91 D co CCGG 159.190 -999.990 ... R5 2002 01 15 11 00 00 36.7300 126.1300 21.00 16.00 5.00 137100 TAP 2001 11 26 04 50 00 4464-91 D co CCGG 159.270 -999.990 ... R5 2002 01 15 11 13 00 36.7300 126.1300 21.00 16.00 5.00 137101 TAP 2001 11 30 05 10 00 1055-91 D co CCGG 178.170 -999.990 ... R5 2002 01 15 11 26 00 36.7300 126.1300 21.00 16.00 5.00 137102 TAP 2001 11 30 05 10 00 1056-91 D co CCGG 179.110 -999.990 ... R5 2002 01 15 11 39 00 36.7300 126.1300 21.00 16.00 5.00 137103 TAP 2001 12 06 07 00 00 433-99 D co CCGG 193.490 -999.990 ... R5 2002 01 15 14 04 00 36.7300 126.1300 21.00 16.00 5.00 137104 TAP 2001 12 06 07 00 00 434-99 D co CCGG 192.680 -999.990 ... R5 2002 01 15 14 17 00 36.7300 126.1300 21.00 16.00 5.00 137105 TAP 2001 12 13 04 40 00 431-99 D co CCGG 183.610 -999.990 ... R5 2002 01 17 14 49 00 36.7300 126.1300 21.00 16.00 5.00 137106 TAP 2001 12 13 04 40 00 432-99 D co CCGG 184.390 -999.990 ... R5 2002 01 17 15 02 00 36.7300 126.1300 21.00 16.00 5.00 137107 TAP 2001 12 17 06 30 00 1667-91 D co CCGG 169.790 -999.990 ... R5 2002 01 17 14 22 00 36.7300 126.1300 21.00 16.00 5.00 137108 TAP 2001 12 17 06 30 00 1668-91 D co CCGG 168.430 -999.990 ... R5 2002 01 17 14 35 00 36.7300 126.1300 21.00 16.00 5.00 137109 TAP 2001 12 26 05 30 00 109-91 D co CCGG 200.630 -999.990 ... R5 2002 01 17 13 56 00 36.7300 126.1300 21.00 16.00 5.00 137110 TAP 2001 12 26 05 30 00 110-91 D co CCGG 201.450 -999.990 ... R5 2002 01 17 14 09 00 36.7300 126.1300 21.00 16.00 5.00 137111 TAP 2002 01 01 05 10 00 1777-91 D co CCGG 180.570 -999.990 ... R5 2002 02 06 13 04 00 36.7300 126.1300 21.00 16.00 5.00 137112 TAP 2002 01 08 04 15 00 1369-91 D co CCGG 248.040 -999.990 ..C R5 2002 02 06 12 12 00 36.7300 126.1300 21.00 16.00 5.00 137113 TAP 2002 01 08 04 15 00 1370-91 D co CCGG 246.510 -999.990 ..C R5 2002 02 06 12 25 00 36.7300 126.1300 21.00 16.00 5.00 137114 TAP 2002 02 09 03 36 00 1947-91 D co CCGG 184.350 -999.990 ... R5 2002 03 07 14 53 00 36.7300 126.1300 21.00 16.00 5.00 137115 TAP 2002 02 09 03 36 00 1948-91 D co CCGG 185.520 -999.990 ... R5 2002 03 07 15 06 00 36.7300 126.1300 21.00 16.00 5.00 137116 TAP 2002 02 18 06 38 00 95-99 D co CCGG 242.160 -999.990 ..C R5 2002 03 07 15 19 00 36.7300 126.1300 21.00 16.00 5.00 137117 TAP 2002 02 18 06 38 00 96-99 D co CCGG 243.040 -999.990 ..C R5 2002 03 07 15 32 00 36.7300 126.1300 21.00 16.00 5.00 137118 TAP 2002 02 23 04 20 00 4101-91 D co CCGG 250.020 -999.990 ..C R5 2002 03 28 13 32 00 36.7300 126.1300 21.00 16.00 5.00 137119 TAP 2002 02 23 04 20 00 4102-91 D co CCGG 251.370 -999.990 ..C R5 2002 03 28 13 45 00 36.7300 126.1300 21.00 16.00 5.00 137120 TAP 2002 03 07 04 17 00 555-91 D co CCGG 211.880 -999.990 ... R5 2002 03 28 13 58 00 36.7300 126.1300 21.00 16.00 5.00 137121 TAP 2002 03 07 04 17 00 556-91 D co CCGG 212.770 -999.990 ... R5 2002 03 28 14 11 00 36.7300 126.1300 21.00 16.00 5.00 137122 TAP 2002 03 15 04 29 00 4685-91 D co CCGG 254.570 -999.990 ..C R5 2002 04 22 15 00 00 36.7300 126.1300 21.00 16.00 5.00 137123 TAP 2002 03 15 04 29 00 4686-91 D co CCGG 254.130 -999.990 ..C R5 2002 04 22 15 13 00 36.7300 126.1300 21.00 16.00 5.00 137124 TAP 2002 03 22 04 20 00 797-91 D co CCGG 292.420 -999.990 ..C R5 2002 04 22 15 26 00 36.7300 126.1300 21.00 16.00 5.00 137125 TAP 2002 03 22 04 20 00 798-91 D co CCGG 290.310 -999.990 ..C R5 2002 04 22 15 39 00 36.7300 126.1300 21.00 16.00 5.00 137126 TAP 2002 04 03 07 00 00 131-99 D co CCGG 418.170 -999.990 .XC R5 2002 05 15 11 51 00 36.7300 126.1300 21.00 16.00 5.00 137127 TAP 2002 04 03 07 00 00 132-99 D co CCGG 416.410 -999.990 .XC R5 2002 05 15 12 04 00 36.7300 126.1300 21.00 16.00 5.00 137128 TAP 2002 04 17 04 24 00 1919-91 D co CCGG 173.800 -999.990 ... R5 2002 05 15 10 31 00 36.7300 126.1300 21.00 16.00 5.00 137129 TAP 2002 04 17 04 24 00 1920-91 D co CCGG 172.630 -999.990 ... R5 2002 05 15 10 44 00 36.7300 126.1300 21.00 16.00 5.00 137130 TAP 2002 05 13 04 14 00 1473-91 D co CCGG 212.250 -999.990 ... R5 2002 06 27 16 20 00 36.7300 126.1300 21.00 16.00 5.00 137131 TAP 2002 05 13 04 14 00 1474-91 D co CCGG 209.950 -999.990 ... R5 2002 06 27 16 33 00 36.7300 126.1300 21.00 16.00 5.00 137132 TAP 2002 05 20 05 43 00 633-91 D co CCGG 369.640 -999.990 ..C R5 2002 06 27 15 26 00 36.7300 126.1300 21.00 16.00 5.00 137133 TAP 2002 05 20 05 43 00 634-91 D co CCGG 370.120 -999.990 ..C R5 2002 06 27 15 39 00 36.7300 126.1300 21.00 16.00 5.00 137134 TAP 2002 06 11 04 53 00 4235-91 D co CCGG 223.040 -999.990 ... R5 2002 09 25 14 40 00 36.7300 126.1300 21.00 16.00 5.00 137135 TAP 2002 06 11 04 53 00 4236-91 D co CCGG 223.100 -999.990 ... R5 2002 09 25 14 53 00 36.7300 126.1300 21.00 16.00 5.00 137136 TAP 2002 06 21 05 17 00 499-99 D co CCGG 223.450 -999.990 ... R5 2002 09 25 15 06 00 36.7300 126.1300 21.00 16.00 5.00 137137 TAP 2002 06 21 05 17 00 500-99 D co CCGG 221.910 -999.990 ... R5 2002 09 25 15 19 00 36.7300 126.1300 21.00 16.00 5.00 137138 TAP 2002 06 26 04 29 00 97-99 D co CCGG 135.270 -999.990 ... R5 2002 07 30 10 20 00 36.7300 126.1300 21.00 16.00 5.00 137139 TAP 2002 06 26 04 29 00 98-99 D co CCGG 136.290 -999.990 ... R5 2002 07 30 10 34 00 36.7300 126.1300 21.00 16.00 5.00 137140 TAP 2002 07 16 05 03 00 1583-91 D co CCGG 300.840 -999.990 ..C R5 2002 07 30 09 54 00 36.7300 126.1300 21.00 16.00 5.00 137141 TAP 2002 07 16 05 03 00 1584-91 D co CCGG 299.170 -999.990 ..C R5 2002 07 30 10 07 00 36.7300 126.1300 21.00 16.00 5.00 137142 TAP 2002 07 24 04 58 00 419-99 D co CCGG 79.410 -999.990 ... R5 2002 08 29 11 33 00 36.7300 126.1300 21.00 16.00 5.00 137143 TAP 2002 07 24 04 58 00 420-99 D co CCGG 78.290 -999.990 ... R5 2002 08 29 11 46 00 36.7300 126.1300 21.00 16.00 5.00 137144 TAP 2002 07 31 05 15 00 151-91 D co CCGG 140.580 -999.990 P.. R5 2002 08 29 11 07 00 36.7300 126.1300 21.00 16.00 5.00 137145 TAP 2002 07 31 05 15 00 152-91 D co CCGG 120.060 -999.990 P.. R5 2002 08 29 11 20 00 36.7300 126.1300 21.00 16.00 5.00 137146 TAP 2002 08 05 07 18 00 215-91 D co CCGG 85.300 -999.990 ... R5 2002 09 19 11 42 00 36.7300 126.1300 21.00 16.00 5.00 137147 TAP 2002 08 05 07 18 00 216-91 D co CCGG 84.130 -999.990 ... R5 2002 09 19 11 55 00 36.7300 126.1300 21.00 16.00 5.00 137148 TAP 2002 08 20 04 18 00 443-91 D co CCGG 227.240 -999.990 ... R5 2002 09 19 10 49 00 36.7300 126.1300 21.00 16.00 5.00 137149 TAP 2002 08 20 04 18 00 444-91 D co CCGG 226.030 -999.990 ... R5 2002 09 19 11 02 00 36.7300 126.1300 21.00 16.00 5.00 137150 TAP 2002 08 29 07 15 00 1439-91 D co CCGG 483.690 -999.990 .XC R5 2002 10 07 13 59 00 36.7300 126.1300 21.00 16.00 5.00 137151 TAP 2002 08 29 07 15 00 1440-91 D co CCGG 483.240 -999.990 .XC R5 2002 10 07 14 12 00 36.7300 126.1300 21.00 16.00 5.00 137152 TAP 2002 09 05 05 17 00 4847-98 D co CCGG 289.920 -999.990 ..C R5 2002 10 07 13 33 00 36.7300 126.1300 21.00 16.00 5.00 137153 TAP 2002 09 05 05 17 00 4848-98 D co CCGG 291.120 -999.990 ..C R5 2002 10 07 13 46 00 36.7300 126.1300 21.00 16.00 5.00 137154 TAP 2002 09 11 04 40 00 1163-91 D co CCGG 339.610 -999.990 P.C R5 2002 10 17 13 15 00 36.7300 126.1300 21.00 16.00 5.00 137155 TAP 2002 09 11 04 40 00 1164-91 D co CCGG 343.210 -999.990 P.C R5 2002 10 17 13 28 00 36.7300 126.1300 21.00 16.00 5.00 137156 TAP 2002 09 18 04 40 00 1667-91 D co CCGG 221.200 -999.990 ... R5 2002 10 17 12 49 00 36.7300 126.1300 21.00 16.00 5.00 137157 TAP 2002 09 18 04 40 00 1668-91 D co CCGG 218.160 -999.990 ... R5 2002 10 17 13 02 00 36.7300 126.1300 21.00 16.00 5.00 137158 TAP 2002 09 30 04 26 00 1963-91 D co CCGG 269.150 -999.990 P.C R5 2002 11 01 09 50 00 36.7300 126.1300 21.00 16.00 5.00 137159 TAP 2002 09 30 04 26 00 1964-91 D co CCGG 254.610 -999.990 P.C R5 2002 11 01 10 03 00 36.7300 126.1300 21.00 16.00 5.00 137160 TAP 2002 10 04 04 45 00 4475-91 D co CCGG 497.920 -999.990 P.C R5 2002 11 01 10 16 00 36.7300 126.1300 21.00 16.00 5.00 137161 TAP 2002 10 04 04 45 00 4476-91 D co CCGG 504.690 -999.990 P.C R5 2002 11 01 10 29 00 36.7300 126.1300 21.00 16.00 5.00 137162 TAP 2002 10 28 04 56 00 751-91 D co CCGG 164.420 -999.990 ... R5 2002 11 21 11 40 00 36.7300 126.1300 21.00 16.00 5.00 137163 TAP 2002 10 28 04 56 00 752-91 D co CCGG 164.220 -999.990 ... R5 2002 11 21 11 53 00 36.7300 126.1300 21.00 16.00 5.00 137164 TAP 2002 11 01 04 10 00 1207-91 D co CCGG 203.520 -999.990 ... R5 2002 11 21 11 14 00 36.7300 126.1300 21.00 16.00 5.00 137165 TAP 2002 11 01 04 10 00 1208-91 D co CCGG 203.400 -999.990 ... R5 2002 11 21 11 27 00 36.7300 126.1300 21.00 16.00 5.00 137166 TAP 2002 11 09 03 59 00 4319-91 D co CCGG 197.560 -999.990 ... R5 2002 12 30 09 56 00 36.7300 126.1300 21.00 16.00 5.00 137167 TAP 2002 11 09 03 59 00 4320-91 D co CCGG 198.160 -999.990 ... R5 2002 12 30 10 09 00 36.7300 126.1300 21.00 16.00 5.00 137168 TAP 2002 11 14 04 52 00 1129-91 D co CCGG 265.040 -999.990 ..C R5 2002 12 27 15 32 00 36.7300 126.1300 21.00 16.00 5.00 137169 TAP 2002 11 14 04 52 00 1130-91 D co CCGG 266.820 -999.990 ..C R5 2002 12 27 15 45 00 36.7300 126.1300 21.00 16.00 5.00 137170 TAP 2002 11 21 04 03 00 4373-91 D co CCGG 189.050 -999.990 ... R5 2003 01 08 09 34 00 36.7300 126.1300 21.00 16.00 5.00 137171 TAP 2002 11 21 04 03 00 4374-91 D co CCGG 189.260 -999.990 ... R5 2003 01 08 09 47 00 36.7300 126.1300 21.00 16.00 5.00 137172 TAP 2002 12 04 05 40 00 4273-91 D co CCGG 375.030 -999.990 .XC R5 2003 01 08 10 00 00 36.7300 126.1300 21.00 16.00 5.00 137173 TAP 2002 12 04 05 40 00 4274-91 D co CCGG 375.130 -999.990 .XC R5 2003 01 08 10 14 00 36.7300 126.1300 21.00 16.00 5.00 137174 TAP 2002 12 12 06 38 00 4001-91 D co CCGG 224.420 -999.990 ... R5 2003 01 20 09 51 00 36.7300 126.1300 21.00 16.00 5.00 137175 TAP 2002 12 12 06 38 00 4002-91 D co CCGG 225.530 -999.990 ... R5 2003 01 20 10 04 00 36.7300 126.1300 21.00 16.00 5.00 137176 TAP 2002 12 26 05 26 00 1057-91 D co CCGG 180.040 -999.990 ... R5 2003 01 16 09 17 00 36.7300 126.1300 21.00 16.00 5.00 137177 TAP 2002 12 26 05 26 00 1058-91 D co CCGG 179.900 -999.990 ... R5 2003 01 16 09 30 00 36.7300 126.1300 21.00 16.00 5.00 137178 TAP 2003 02 11 04 40 00 75-91 D co CCGG 259.450 -999.990 ..C R5 2003 03 20 16 03 00 36.7300 126.1300 21.00 16.00 5.00 137179 TAP 2003 02 11 04 40 00 76-91 D co CCGG 258.170 -999.990 ..C R5 2003 03 20 16 16 00 36.7300 126.1300 21.00 16.00 5.00 137180 TAP 2003 02 19 05 43 00 151-91 D co CCGG 487.920 -999.990 .XC R5 2003 03 20 13 51 00 36.7300 126.1300 21.00 16.00 5.00 137181 TAP 2003 02 19 05 43 00 152-91 D co CCGG 487.770 -999.990 .XC R5 2003 03 20 14 04 00 36.7300 126.1300 21.00 16.00 5.00 137182 TAP 2003 03 03 05 05 00 323-99 D co CCGG 206.490 -999.990 ... R5 2003 06 11 12 47 00 36.7300 126.1300 21.00 16.00 5.00 137183 TAP 2003 03 03 05 05 00 324-99 D co CCGG 205.650 -999.990 ... R5 2003 06 11 13 00 00 36.7300 126.1300 21.00 16.00 5.00 137184 TAP 2003 03 10 05 15 00 1723-91 D co CCGG 262.100 -999.990 ..C R5 2003 06 11 12 21 00 36.7300 126.1300 21.00 16.00 5.00 137185 TAP 2003 03 10 05 15 00 1724-91 D co CCGG 262.710 -999.990 ..C R5 2003 06 11 12 34 00 36.7300 126.1300 21.00 16.00 5.00 137186 TAP 2003 03 17 05 17 00 1037-91 D co CCGG 360.100 -999.990 ..C R5 2003 04 22 16 49 00 36.7300 126.1300 21.00 16.00 5.00 137187 TAP 2003 03 17 05 17 00 1038-91 D co CCGG 358.750 -999.990 ..C R5 2003 04 22 17 02 00 36.7300 126.1300 21.00 16.00 5.00 137188 TAP 2003 03 27 04 35 00 4601-91 D co CCGG 241.040 -999.990 ..C R5 2003 04 22 15 31 00 36.7300 126.1300 21.00 16.00 5.00 137189 TAP 2003 03 27 04 35 00 4602-91 D co CCGG 239.640 -999.990 ..C R5 2003 04 22 15 44 00 36.7300 126.1300 21.00 16.00 5.00 137190 TAP 2003 04 30 04 20 00 4281-91 D co CCGG 371.900 -999.990 P.C R5 2003 06 10 15 44 00 36.7300 126.1300 21.00 16.00 5.00 137191 TAP 2003 04 30 04 20 00 4282-91 D co CCGG 366.910 -999.990 P.C R5 2003 06 10 15 57 00 36.7300 126.1300 21.00 16.00 5.00 137192 TAP 2003 05 09 07 40 00 897-91 D co CCGG 272.870 -999.990 ..C R5 2003 06 10 16 10 00 36.7300 126.1300 21.00 16.00 5.00 137193 TAP 2003 05 09 07 40 00 898-91 D co CCGG 273.520 -999.990 ..C R5 2003 06 10 16 23 00 36.7300 126.1300 21.00 16.00 5.00 137194 TAP 2003 05 27 06 20 00 1513-91 D co CCGG 295.910 -999.990 ..C R5 2003 06 19 17 09 00 36.7300 126.1300 21.00 16.00 5.00 137195 TAP 2003 05 27 06 20 00 1514-91 D co CCGG 294.960 -999.990 ..C R5 2003 06 19 17 22 00 36.7300 126.1300 21.00 16.00 5.00 137196 TAP 2003 05 30 08 02 00 449-91 D co CCGG 266.310 -999.990 ..C R5 2003 06 20 10 55 00 36.7300 126.1300 21.00 16.00 5.00 137197 TAP 2003 05 30 08 02 00 450-91 D co CCGG 264.640 -999.990 ..C R5 2003 06 20 11 08 00 36.7300 126.1300 21.00 16.00 5.00 137198 TAP 2003 06 14 03 48 00 1299-99 D co CCGG 214.350 -999.990 ... R5 2003 08 11 13 31 00 36.7300 126.1300 21.00 16.00 5.00 137199 TAP 2003 06 14 03 48 00 1300-99 D co CCGG 214.930 -999.990 ... R5 2003 08 11 13 44 00 36.7300 126.1300 21.00 16.00 5.00 137200 TAP 2003 06 24 04 38 00 1301-99 D co CCGG 257.850 -999.990 P.C R5 2003 08 11 13 05 00 36.7300 126.1300 21.00 16.00 5.00 137201 TAP 2003 06 24 04 38 00 1302-99 D co CCGG 260.900 -999.990 P.C R5 2003 08 11 13 18 00 36.7300 126.1300 21.00 16.00 5.00 137202 TAP 2003 07 29 06 16 00 1271-91 D co CCGG 238.540 -999.990 ..C R5 2003 09 03 09 39 00 36.7300 126.1300 21.00 16.00 5.00 137203 TAP 2003 07 29 06 16 00 1272-91 D co CCGG 237.110 -999.990 ..C R5 2003 09 03 09 52 00 36.7300 126.1300 21.00 16.00 5.00 137204 TAP 2003 08 12 05 25 00 1939-91 D co CCGG 360.300 -999.990 .XC R5 2003 09 03 09 13 00 36.7300 126.1300 21.00 16.00 5.00 137205 TAP 2003 08 12 05 25 00 1940-91 D co CCGG 360.020 -999.990 .XC R5 2003 09 03 09 26 00 36.7300 126.1300 21.00 16.00 5.00 137206 TAP 2003 08 20 06 02 00 1821-91 D co CCGG 113.270 -999.990 ... R5 2003 09 26 12 25 00 36.7300 126.1300 21.00 16.00 5.00 137207 TAP 2003 08 20 06 02 00 1822-91 D co CCGG 112.880 -999.990 ... R5 2003 09 26 12 38 00 36.7300 126.1300 21.00 16.00 5.00 137208 TAP 2003 08 25 05 49 00 1609-99 D co CCGG 158.810 -999.990 ... R5 2003 09 26 11 59 00 36.7300 126.1300 21.00 16.00 5.00 137209 TAP 2003 08 25 05 49 00 1610-99 D co CCGG 158.790 -999.990 ... R5 2003 09 26 12 12 00 36.7300 126.1300 21.00 16.00 5.00 137210 TAP 2003 08 28 05 48 00 1607-99 D co CCGG 179.600 -999.990 ... R5 2003 09 26 11 33 00 36.7300 126.1300 21.00 16.00 5.00 137211 TAP 2003 08 28 05 48 00 1608-99 D co CCGG 180.120 -999.990 ... R5 2003 09 26 11 46 00 36.7300 126.1300 21.00 16.00 5.00 137212 TAP 2003 09 06 03 50 00 1033-91 D co CCGG 321.340 -999.990 ..C R5 2003 09 26 11 05 00 36.7300 126.1300 21.00 16.00 5.00 137213 TAP 2003 09 06 03 50 00 1034-91 D co CCGG 323.210 -999.990 ..C R5 2003 09 26 11 18 00 36.7300 126.1300 21.00 16.00 5.00 137214 TAP 2003 09 23 07 30 00 4637-91 D co CCGG 156.350 -999.990 ... R5 2003 10 23 15 15 00 36.7300 126.1300 21.00 16.00 5.00 137215 TAP 2003 09 23 07 30 00 4638-91 D co CCGG 155.350 -999.990 ... R5 2003 10 23 15 28 00 36.7300 126.1300 21.00 16.00 5.00 137216 TAP 2003 10 06 06 00 00 4331-91 D co CCGG 285.740 -999.990 ..C R5 2003 10 23 13 56 00 36.7300 126.1300 21.00 16.00 5.00 137217 TAP 2003 10 06 06 00 00 4332-91 D co CCGG 283.640 -999.990 ..C R5 2003 10 23 14 09 00 36.7300 126.1300 21.00 16.00 5.00 137218 TAP 2003 10 14 07 43 00 4827-91 D co CCGG 200.360 -999.990 ... R5 2003 11 07 10 23 00 36.7300 126.1300 21.00 16.00 5.00 137219 TAP 2003 10 14 07 43 00 4828-91 D co CCGG 199.260 -999.990 ... R5 2003 11 07 10 36 00 36.7300 126.1300 21.00 16.00 5.00 137220 TAP 2003 10 23 04 54 00 1853-99 D co CCGG 198.140 -999.990 ... R5 2003 11 07 09 57 00 36.7300 126.1300 21.00 16.00 5.00 137221 TAP 2003 10 23 04 54 00 1854-99 D co CCGG 198.530 -999.990 ... R5 2003 11 07 10 10 00 36.7300 126.1300 21.00 16.00 5.00 137222 TAP 2003 10 28 03 52 00 1855-99 D co CCGG 159.660 -999.990 ... R5 2004 01 08 13 14 00 36.7300 126.1300 21.00 16.00 5.00 137223 TAP 2003 10 28 03 52 00 1856-99 D co CCGG 157.950 -999.990 ... R5 2004 01 08 13 27 00 36.7300 126.1300 21.00 16.00 5.00 137224 TAP 2003 11 03 05 40 00 4905-91 D co CCGG 327.510 -999.990 ..C R5 2004 01 08 13 40 00 36.7300 126.1300 21.00 16.00 5.00 137225 TAP 2003 11 03 05 40 00 4906-91 D co CCGG 327.340 -999.990 ..C R5 2004 01 08 13 53 00 36.7300 126.1300 21.00 16.00 5.00 137226 TAP 2003 11 21 04 30 00 4887-91 D co CCGG 159.290 -999.990 ... R5 2004 01 09 10 07 00 36.7300 126.1300 21.00 16.00 5.00 137227 TAP 2003 11 21 04 30 00 4888-91 D co CCGG 159.220 -999.990 ... R5 2004 01 09 10 20 00 36.7300 126.1300 21.00 16.00 5.00 137228 TAP 2003 12 15 06 30 00 1531-99 D co CCGG 201.490 -999.990 ... R5 2004 01 09 09 41 00 36.7300 126.1300 21.00 16.00 5.00 137229 TAP 2003 12 15 06 30 00 1532-99 D co CCGG 202.770 -999.990 ... R5 2004 01 09 09 54 00 36.7300 126.1300 21.00 16.00 5.00 137230 TAP 2003 12 23 04 07 00 591-91 D co CCGG 483.200 -999.990 P.C R5 2004 02 06 11 58 00 36.7300 126.1300 21.00 16.00 5.00 137231 TAP 2003 12 23 04 07 00 592-91 D co CCGG 477.100 -999.990 P.C R5 2004 02 06 12 11 00 36.7300 126.1300 21.00 16.00 5.00 137232 TAP 2004 01 12 04 30 00 981-91 D co CCGG 174.740 -999.990 ... R5 2004 02 06 11 30 00 36.7300 126.1300 21.00 16.00 5.00 137233 TAP 2004 01 12 04 30 00 982-91 D co CCGG 173.950 -999.990 ... R5 2004 02 06 11 43 00 36.7300 126.1300 21.00 16.00 5.00 137234 TAP 2004 01 19 06 40 00 4239-91 D co CCGG 233.660 -999.990 ..C R5 2004 02 19 17 52 00 36.7300 126.1300 21.00 16.00 5.00 137235 TAP 2004 01 19 06 40 00 4240-91 D co CCGG 232.160 -999.990 ..C R5 2004 02 19 18 05 00 36.7300 126.1300 21.00 16.00 5.00 137236 TAP 2004 02 03 04 30 00 1177-99 D co CCGG 207.880 -999.990 ... R5 2004 02 20 09 05 00 36.7300 126.1300 21.00 16.00 5.00 137237 TAP 2004 02 03 04 30 00 1178-99 D co CCGG 206.600 -999.990 ... R5 2004 02 20 09 18 00 36.7300 126.1300 21.00 16.00 5.00 137238 TAP 2004 02 10 07 20 00 1465-91 D co CCGG 237.620 -999.990 ..C R5 2004 03 17 15 12 00 36.7300 126.1300 21.00 16.00 5.00 137239 TAP 2004 02 10 07 20 00 1466-91 D co CCGG 237.120 -999.990 ..C R5 2004 03 17 15 25 00 36.7300 126.1300 21.00 16.00 5.00 137240 TAP 2004 02 17 06 25 00 2247-99 D co CCGG 575.220 -999.990 .XC R5 2004 03 17 15 38 00 36.7300 126.1300 21.00 16.00 5.00 137241 TAP 2004 02 17 06 25 00 2248-99 D co CCGG 573.630 -999.990 .XC R5 2004 03 17 15 51 00 36.7300 126.1300 21.00 16.00 5.00 137242 TAP 2004 03 02 05 25 00 1673-99 D co CCGG 198.300 -999.990 ... R5 2004 03 25 17 30 00 36.7300 126.1300 21.00 16.00 5.00 137243 TAP 2004 03 02 05 25 00 1674-99 D co CCGG 198.450 -999.990 ... R5 2004 03 25 17 43 00 36.7300 126.1300 21.00 16.00 5.00 137244 TAP 2004 03 12 05 28 00 1529-99 D co CCGG 250.510 -999.990 ..C R5 2004 03 25 17 04 00 36.7300 126.1300 21.00 16.00 5.00 137245 TAP 2004 03 18 04 40 00 1515-99 D co CCGG 213.380 -999.990 ... R5 2004 05 03 15 54 00 36.7300 126.1300 21.00 16.00 5.00 137246 TAP 2004 03 18 04 40 00 1516-99 D co CCGG 213.760 -999.990 ... R5 2004 05 03 16 07 00 36.7300 126.1300 21.00 16.00 5.00 137247 TAP 2004 03 30 05 30 00 2179-99 D co CCGG 187.810 -999.990 ... R5 2004 05 03 13 16 00 36.7300 126.1300 21.00 16.00 5.00 137248 TAP 2004 03 30 05 30 00 2180-99 D co CCGG 187.440 -999.990 ... R5 2004 05 03 13 29 00 36.7300 126.1300 21.00 16.00 5.00 137249 TAP 2004 04 03 03 05 00 2173-99 D co CCGG 295.110 -999.990 ..C R5 2004 05 07 11 29 00 36.7300 126.1300 21.00 16.00 5.00 137250 TAP 2004 04 03 03 05 00 2174-99 D co CCGG 294.490 -999.990 ..C R5 2004 05 07 11 42 00 36.7300 126.1300 21.00 16.00 5.00 137251 TAP 2004 04 07 09 32 00 245-99 D co CCGG 284.160 -999.990 P.C R5 2004 05 07 11 03 00 36.7300 126.1300 21.00 16.00 5.00 137252 TAP 2004 04 07 09 32 00 246-99 D co CCGG 301.600 -999.990 P.C R5 2004 05 07 11 16 00 36.7300 126.1300 21.00 16.00 5.00 137253 TAP 2004 04 24 02 13 00 235-99 D co CCGG 213.250 -999.990 ... R5 2004 06 01 10 24 00 36.7300 126.1300 21.00 16.00 5.00 137254 TAP 2004 04 24 02 13 00 236-99 D co CCGG 212.820 -999.990 ... R5 2004 06 01 10 37 00 36.7300 126.1300 21.00 16.00 5.00 137255 TAP 2004 05 14 05 50 00 2017-99 D co CCGG 383.970 -999.990 ..C R5 2004 06 01 16 41 00 36.7300 126.1300 21.00 16.00 5.00 137256 TAP 2004 05 14 05 50 00 2018-99 D co CCGG 385.310 -999.990 ..C R5 2004 06 01 16 54 00 36.7300 126.1300 21.00 16.00 5.00 137257 TAP 2004 05 21 05 20 00 3615-99 D co CCGG 216.660 -999.990 P.. R5 2004 07 07 15 13 00 36.7300 126.1300 21.00 16.00 5.00 137258 TAP 2004 05 21 05 20 00 3616-99 D co CCGG 227.950 -999.990 P.. R5 2004 07 07 15 26 00 36.7300 126.1300 21.00 16.00 5.00 137259 TAP 2004 06 09 06 20 00 3617-99 D co CCGG 354.940 -999.990 ..C R5 2004 07 07 14 21 00 36.7300 126.1300 21.00 16.00 5.00 137260 TAP 2004 06 09 06 20 00 3618-99 D co CCGG 354.490 -999.990 ..C R5 2004 07 07 14 34 00 36.7300 126.1300 21.00 16.00 5.00 137261 TAP 2004 06 29 05 30 00 6393-66 D co CCGG 176.150 -999.990 ... R5 2004 09 23 09 53 00 36.7100 126.1100 21.00 16.00 5.00 188413 TAP 2004 06 29 05 30 00 6394-66 D co CCGG 176.580 -999.990 ... R5 2004 09 23 10 07 00 36.7100 126.1100 21.00 16.00 5.00 188414 TAP 2004 07 05 05 50 00 2603-99 D co CCGG 198.480 -999.990 ... R5 2004 09 23 11 32 00 36.7100 126.1100 21.00 16.00 5.00 188419 TAP 2004 07 05 05 50 00 2604-99 D co CCGG 199.200 -999.990 ... R5 2004 09 23 11 46 00 36.7100 126.1100 21.00 16.00 5.00 188420 TAP 2004 07 12 06 55 00 1603-99 D co CCGG 175.150 -999.990 ... R5 2004 09 23 10 35 00 36.7100 126.1100 21.00 16.00 5.00 188417 TAP 2004 07 12 06 55 00 1604-99 D co CCGG 174.010 -999.990 ... R5 2004 09 23 10 50 00 36.7100 126.1100 21.00 16.00 5.00 188418 TAP 2004 07 19 06 57 00 1337-99 D co CCGG 72.960 -999.990 ... R5 2004 09 23 11 04 00 36.7100 126.1100 21.00 16.00 5.00 188415 TAP 2004 07 19 06 57 00 1338-99 D co CCGG 73.450 -999.990 ... R5 2004 09 23 11 18 00 36.7100 126.1100 21.00 16.00 5.00 188416 TAP 2004 07 29 04 35 00 3237-99 D co CCGG 114.000 -999.990 ... R5 2004 09 23 14 59 00 36.7100 126.1100 21.00 16.00 5.00 188368 TAP 2004 07 29 04 35 00 3238-99 D co CCGG 115.440 -999.990 ... R5 2004 09 23 15 13 00 36.7100 126.1100 21.00 16.00 5.00 188369 TAP 2004 08 11 06 19 00 3737-99 D co CCGG 243.630 -999.990 ..C R5 2004 09 23 16 54 00 36.7100 126.1100 21.00 16.00 5.00 188370 TAP 2004 08 11 06 19 00 3738-99 D co CCGG 242.770 -999.990 ..C R5 2004 09 23 17 08 00 36.7100 126.1100 21.00 16.00 5.00 188371 TAP 2004 08 29 02 40 00 3539-99 D co CCGG 156.190 -999.990 ... R5 2004 10 06 09 00 00 36.7100 126.1100 21.00 16.00 5.00 189591 TAP 2004 08 29 02 40 00 3540-99 D co CCGG 155.850 -999.990 ... R5 2004 10 06 09 14 00 36.7100 126.1100 21.00 16.00 5.00 189592 TAP 2004 09 08 06 50 00 1061-99 D co CCGG 183.900 -999.990 ... R5 2004 10 06 09 28 00 36.7100 126.1100 21.00 16.00 5.00 189589 TAP 2004 09 08 06 50 00 1062-99 D co CCGG 183.860 -999.990 ... R5 2004 10 06 09 42 00 36.7100 126.1100 21.00 16.00 5.00 189590 TAP 2004 09 18 04 45 00 995-99 D co CCGG 186.050 -999.990 ... R5 2004 11 09 10 44 00 36.7100 126.1100 21.00 16.00 5.00 191307 TAP 2004 09 18 04 45 00 996-99 D co CCGG 183.550 -999.990 ... R5 2004 11 09 10 58 00 36.7100 126.1100 21.00 16.00 5.00 191308 TAP 2004 10 13 04 26 00 12-99 D co CCGG 161.400 -999.990 ... R5 2004 11 09 10 29 00 36.7100 126.1100 21.00 16.00 5.00 191305 TAP 2004 10 13 04 26 00 997-99 D co CCGG 162.740 -999.990 ... R5 2004 11 09 10 15 00 36.7100 126.1100 21.00 16.00 5.00 191306 TAP 2004 10 22 04 38 00 6233-66 D co CCGG 132.800 -999.990 ... R5 2004 11 24 11 47 00 36.7100 126.1100 21.00 16.00 5.00 192149 TAP 2004 10 22 04 38 00 6234-66 D co CCGG 132.400 -999.990 ... R5 2004 11 24 12 01 00 36.7100 126.1100 21.00 16.00 5.00 192150 TAP 2004 11 06 03 10 00 1666-99 D co CCGG 138.960 -999.990 ... R5 2004 11 24 13 26 00 36.7100 126.1100 21.00 16.00 5.00 192148 TAP 2004 11 12 05 15 00 1711-99 D co CCGG 149.640 -999.990 ... R5 2004 12 02 16 42 00 36.7100 126.1100 21.00 16.00 5.00 192483 TAP 2004 11 12 05 15 00 1712-99 D co CCGG 148.160 -999.990 ... R5 2004 12 02 16 56 00 36.7100 126.1100 21.00 16.00 5.00 192484 TAP 2004 11 16 05 30 00 3837-99 D co CCGG 267.170 -999.990 ..C R5 2004 12 02 17 10 00 36.7100 126.1100 21.00 16.00 5.00 192485 TAP 2004 11 16 05 30 00 3838-99 D co CCGG 267.310 -999.990 ..C R5 2004 12 02 17 24 00 36.7100 126.1100 21.00 16.00 5.00 192486 TAP 2004 11 27 04 10 00 429-99 D co CCGG 354.810 -999.990 ..C R5 2005 01 25 09 39 00 36.7100 126.1100 21.00 16.00 5.00 194252 TAP 2004 11 27 04 10 00 430-99 D co CCGG 354.140 -999.990 ..C R5 2005 01 25 09 54 00 36.7100 126.1100 21.00 16.00 5.00 194253 TAP 2004 12 16 07 50 00 1205-99 D co CCGG 334.140 -999.990 ..C R5 2005 01 24 16 38 00 36.7100 126.1100 21.00 16.00 5.00 194249 TAP 2004 12 16 07 50 00 1206-99 D co CCGG 333.870 -999.990 ..C R5 2005 01 24 16 52 00 36.7100 126.1100 21.00 16.00 5.00 194250 TAP 2004 12 20 03 45 00 2265-99 D co CCGG 201.490 -999.990 ... R5 2005 01 28 12 00 00 36.7100 126.1100 21.00 16.00 5.00 194513 TAP 2004 12 20 03 45 00 998-99 D co CCGG 202.590 -999.990 ... R5 2005 01 28 12 14 00 36.7100 126.1100 21.00 16.00 5.00 194514 TAP 2004 12 28 04 20 00 100-99 D co CCGG 277.810 -999.990 ..C R5 2005 01 28 12 42 00 36.7100 126.1100 21.00 16.00 5.00 194511 TAP 2004 12 28 04 20 00 99-99 D co CCGG 277.180 -999.990 ..C R5 2005 01 28 12 28 00 36.7100 126.1100 21.00 16.00 5.00 194512 TAP 2005 01 04 04 35 00 1261-99 D co CCGG 202.620 -999.990 ... R5 2005 02 14 09 12 00 36.7100 126.1100 21.00 16.00 5.00 194999 TAP 2005 01 04 04 35 00 1262-99 D co CCGG 202.450 -999.990 ... R5 2005 02 14 09 27 00 36.7100 126.1100 21.00 16.00 5.00 195000 TAP 2005 01 08 04 00 00 1863-99 D co CCGG 201.840 -999.990 ... R5 2005 02 14 09 41 00 36.7100 126.1100 21.00 16.00 5.00 195001 TAP 2005 01 08 04 00 00 1864-99 D co CCGG 201.450 -999.990 ... R5 2005 02 14 09 55 00 36.7100 126.1100 21.00 16.00 5.00 195002 TAP 2005 02 02 04 30 00 6607-66 D co CCGG 240.550 -999.990 ..C R5 2005 03 15 10 18 00 36.7100 126.1100 21.00 16.00 5.00 196537 TAP 2005 02 02 04 30 00 6608-66 D co CCGG 241.190 -999.990 ..C R5 2005 03 15 10 32 00 36.7100 126.1100 21.00 16.00 5.00 196538 TAP 2005 02 12 02 05 00 3777-99 D co CCGG 218.220 -999.990 P.. R5 2005 03 15 09 21 00 36.7100 126.1100 21.00 16.00 5.00 196535 TAP 2005 02 12 02 05 00 3778-99 D co CCGG 214.330 -999.990 P.. R5 2005 03 15 09 36 00 36.7100 126.1100 21.00 16.00 5.00 196536 TAP 2005 02 19 03 20 00 2469-99 D co CCGG 175.750 -999.990 ... R5 2005 03 15 11 14 00 36.7100 126.1100 21.00 16.00 5.00 196541 TAP 2005 02 19 03 20 00 2470-99 D co CCGG 174.080 -999.990 ... R5 2005 03 15 11 28 00 36.7100 126.1100 21.00 16.00 5.00 196542 TAP 2005 02 19 03 30 00 3407-99 D co CCGG 177.170 -999.990 ... R5 2005 03 15 10 46 00 36.7100 126.1100 21.00 16.00 5.00 196539 TAP 2005 02 19 03 30 00 3408-99 D co CCGG 176.230 -999.990 ... R5 2005 03 15 11 00 00 36.7100 126.1100 21.00 16.00 5.00 196540 TAP 2005 02 26 03 10 00 2576-99 D co CCGG 196.150 -999.990 ... R5 2005 03 16 15 02 00 36.7100 126.1100 21.00 16.00 5.00 196633 TAP 2005 02 26 03 20 00 6119-66 D co CCGG 196.170 -999.990 ... R5 2005 03 16 11 16 00 36.7100 126.1100 21.00 16.00 5.00 196634 TAP 2005 02 26 03 20 00 6120-66 D co CCGG 196.510 -999.990 ... R5 2005 03 16 11 30 00 36.7100 126.1100 21.00 16.00 5.00 196635 TAP 2005 03 03 04 50 00 2467-99 D co CCGG 297.580 -999.990 ..C R5 2005 03 16 10 48 00 36.7100 126.1100 21.00 16.00 5.00 196636 TAP 2005 03 03 04 50 00 2468-99 D co CCGG 298.400 -999.990 ..C R5 2005 03 16 11 02 00 36.7100 126.1100 21.00 16.00 5.00 196637 TAP 2005 03 03 05 05 00 3209-99 D co CCGG 297.950 -999.990 ..C R5 2005 03 16 09 18 00 36.7100 126.1100 21.00 16.00 5.00 196638 TAP 2005 03 03 05 05 00 3210-99 D co CCGG 295.640 -999.990 ..C R5 2005 03 16 09 32 00 36.7100 126.1100 21.00 16.00 5.00 196639 TAP 2005 03 11 05 44 00 3477-99 D co CCGG 369.180 -999.990 ..C R5 2005 04 04 12 01 00 36.7100 126.1100 21.00 16.00 5.00 197257 TAP 2005 03 11 05 44 00 3478-99 D co CCGG 369.510 -999.990 ..C R5 2005 04 04 12 15 00 36.7100 126.1100 21.00 16.00 5.00 197258 TAP 2005 03 11 06 05 00 585-99 D co CCGG 365.630 -999.990 ..C R5 2005 04 04 12 29 00 36.7100 126.1100 21.00 16.00 5.00 197259 TAP 2005 03 11 06 05 00 586-99 D co CCGG 364.620 -999.990 ..C R5 2005 04 04 12 43 00 36.7100 126.1100 21.00 16.00 5.00 197260 TAP 2005 03 18 04 50 00 3345-99 D co CCGG 233.370 -999.990 ..C R5 2005 04 05 14 09 00 36.7100 126.1100 21.00 16.00 5.00 197333 TAP 2005 03 18 04 50 00 3346-99 D co CCGG 232.550 -999.990 ..C R5 2005 04 05 14 23 00 36.7100 126.1100 21.00 16.00 5.00 197334 TAP 2005 03 18 05 10 00 3119-99 D co CCGG 225.350 -999.990 ... R5 2005 04 06 13 31 00 36.7100 126.1100 21.00 16.00 5.00 197342 TAP 2005 03 18 05 10 00 3120-99 D co CCGG 226.260 -999.990 ... R5 2005 04 06 13 45 00 36.7100 126.1100 21.00 16.00 5.00 197343 TAP 2005 03 29 05 40 00 3741-99 D co CCGG 309.980 -999.990 ..C R5 2005 04 13 16 55 00 36.7100 126.1100 21.00 16.00 5.00 197660 TAP 2005 03 29 05 40 00 3742-99 D co CCGG 308.580 -999.990 ..C R5 2005 04 13 17 09 00 36.7100 126.1100 21.00 16.00 5.00 197661 TAP 2005 03 29 05 55 00 1341-99 D co CCGG 327.670 -999.990 ..C R5 2005 04 14 15 26 00 36.7100 126.1100 21.00 16.00 5.00 197658 TAP 2005 03 29 05 55 00 1342-99 D co CCGG 325.560 -999.990 ..C R5 2005 04 14 15 40 00 36.7100 126.1100 21.00 16.00 5.00 197659 TAP 2005 04 16 05 15 00 151-99 D co CCGG 225.870 -999.990 ... R5 2005 05 04 13 19 00 36.7100 126.1100 21.00 16.00 5.00 198421 TAP 2005 04 16 05 15 00 152-99 D co CCGG 225.640 -999.990 ... R5 2005 05 04 13 34 00 36.7100 126.1100 21.00 16.00 5.00 198422 TAP 2005 04 16 05 25 00 2279-99 D co CCGG 226.850 -999.990 ... R5 2005 05 04 10 58 00 36.7100 126.1100 21.00 16.00 5.00 198451 TAP 2005 04 16 05 25 00 2280-99 D co CCGG 227.040 -999.990 ... R5 2005 05 04 11 13 00 36.7100 126.1100 21.00 16.00 5.00 198452 TAP 2005 05 07 06 03 00 1929-99 D co CCGG 216.580 -999.990 P.. R5 2005 06 15 14 11 00 36.7100 126.1100 21.00 16.00 5.00 200051 TAP 2005 05 07 06 03 00 1930-99 D co CCGG 213.260 -999.990 P.. R5 2005 06 15 14 25 00 36.7100 126.1100 21.00 16.00 5.00 200052 TAP 2005 05 07 06 20 00 3295-99 D co CCGG 210.230 -999.990 ... R5 2005 06 15 14 40 00 36.7100 126.1100 21.00 16.00 5.00 200053 TAP 2005 05 07 06 20 00 3296-99 D co CCGG 209.920 -999.990 ... R5 2005 06 15 14 54 00 36.7100 126.1100 21.00 16.00 5.00 200054 TAP 2005 05 18 06 20 00 287-99 D co CCGG 312.880 -999.990 ..C R5 2005 06 17 10 40 00 36.7100 126.1100 21.00 16.00 5.00 200127 TAP 2005 05 18 06 20 00 288-99 D co CCGG 314.110 -999.990 ..C R5 2005 06 17 10 55 00 36.7100 126.1100 21.00 16.00 5.00 200128 TAP 2005 05 18 06 40 00 1333-99 D co CCGG 318.160 -999.990 ..C R5 2005 06 17 11 09 00 36.7100 126.1100 21.00 16.00 5.00 200125 TAP 2005 05 18 06 40 00 1334-99 D co CCGG 316.900 -999.990 ..C R5 2005 06 17 11 23 00 36.7100 126.1100 21.00 16.00 5.00 200126 TAP 2005 05 23 04 36 00 6367-66 D co CCGG 350.730 -999.990 ..C R5 2005 06 22 10 13 00 36.7100 126.1100 21.00 16.00 5.00 200371 TAP 2005 05 23 04 36 00 6368-66 D co CCGG 350.310 -999.990 ..C R5 2005 06 22 10 27 00 36.7100 126.1100 21.00 16.00 5.00 200372 TAP 2005 05 23 04 52 00 1807-99 D co CCGG 260.760 -999.990 ..C R5 2005 06 22 09 45 00 36.7100 126.1100 21.00 16.00 5.00 200369 TAP 2005 05 23 04 52 00 1808-99 D co CCGG 260.300 -999.990 ..C R5 2005 06 22 09 59 00 36.7100 126.1100 21.00 16.00 5.00 200370 TAP 2005 05 26 05 43 00 2705-99 D co CCGG 203.410 -999.990 ... R5 2005 06 24 13 40 00 36.7100 126.1100 21.00 16.00 5.00 200775 TAP 2005 05 26 05 43 00 2706-99 D co CCGG 203.610 -999.990 ... R5 2005 06 24 13 55 00 36.7100 126.1100 21.00 16.00 5.00 200776 TAP 2005 05 26 05 57 00 2887-99 D co CCGG 202.510 -999.990 ... R5 2005 06 24 14 09 00 36.7100 126.1100 21.00 16.00 5.00 200773 TAP 2005 05 26 05 57 00 2888-99 D co CCGG 203.990 -999.990 ... R5 2005 06 24 14 23 00 36.7100 126.1100 21.00 16.00 5.00 200774 TAP 2005 06 03 04 53 00 3203-99 D co CCGG 388.380 -999.990 ..C R5 2005 07 08 15 05 00 36.7100 126.1100 21.00 16.00 5.00 201285 TAP 2005 06 03 04 53 00 3204-99 D co CCGG 388.310 -999.990 ..C R5 2005 07 08 15 19 00 36.7100 126.1100 21.00 16.00 5.00 201286 TAP 2005 06 03 05 05 00 3841-99 D co CCGG 368.460 -999.990 ..C R5 2005 07 12 14 54 00 36.7100 126.1100 21.00 16.00 5.00 201283 TAP 2005 06 03 05 05 00 3842-99 D co CCGG 367.860 -999.990 ..C R5 2005 07 12 15 08 00 36.7100 126.1100 21.00 16.00 5.00 201284 TAP 2005 06 12 04 55 00 4071-99 D co CCGG 294.520 -999.990 P.C R5 2005 07 22 12 05 00 36.7100 126.1100 21.00 16.00 5.00 201951 TAP 2005 06 12 04 55 00 4072-99 D co CCGG 287.270 -999.990 P.C R5 2005 07 22 12 19 00 36.7100 126.1100 21.00 16.00 5.00 201952 TAP 2005 06 12 05 04 00 3891-99 D co CCGG 313.610 -999.990 ..C R5 2005 07 22 11 37 00 36.7100 126.1100 21.00 16.00 5.00 201953 TAP 2005 06 12 05 04 00 3892-99 D co CCGG 298.130 -999.990 ..C R5 2005 07 22 11 51 00 36.7100 126.1100 21.00 16.00 5.00 201954 TAP 2005 06 16 06 46 00 2511-99 D co CCGG 207.240 -999.990 ... R5 2005 07 29 13 39 00 36.7100 126.1100 21.00 16.00 5.00 202263 TAP 2005 06 16 06 46 00 2512-99 D co CCGG 204.570 -999.990 ... R5 2005 07 29 13 53 00 36.7100 126.1100 21.00 16.00 5.00 202264 TAP 2005 06 16 08 41 00 3725-99 D co CCGG 200.560 -999.990 ... R5 2005 07 29 13 10 00 36.7100 126.1100 21.00 16.00 5.00 202261 TAP 2005 06 16 08 41 00 3726-99 D co CCGG 201.870 -999.990 ... R5 2005 07 29 13 25 00 36.7100 126.1100 21.00 16.00 5.00 202262 TAP 2005 06 22 06 29 00 3669-99 D co CCGG 157.850 -999.990 ... R5 2005 08 03 14 56 00 36.7100 126.1100 21.00 16.00 5.00 203084 TAP 2005 06 22 06 29 00 3670-99 D co CCGG 158.080 -999.990 ... R5 2005 08 03 15 10 00 36.7100 126.1100 21.00 16.00 5.00 203085 TAP 2005 06 22 06 39 00 3859-99 D co CCGG 155.640 -999.990 ... R5 2005 08 03 14 27 00 36.7100 126.1100 21.00 16.00 5.00 203086 TAP 2005 06 22 06 39 00 3860-99 D co CCGG 155.600 -999.990 ... R5 2005 08 03 14 42 00 36.7100 126.1100 21.00 16.00 5.00 203087 TAP 2005 07 04 07 08 00 4115-99 D co CCGG 227.490 -999.990 ... R5 2005 08 17 14 42 00 36.7100 126.1100 21.00 16.00 5.00 203431 TAP 2005 07 04 07 08 00 4116-99 D co CCGG 226.750 -999.990 ... R5 2005 08 17 14 57 00 36.7100 126.1100 21.00 16.00 5.00 203432 TAP 2005 07 04 07 17 00 2865-99 D co CCGG 229.020 -999.990 ... R5 2005 08 17 15 11 00 36.7100 126.1100 21.00 16.00 5.00 203429 TAP 2005 07 04 07 17 00 2866-99 D co CCGG 229.540 -999.990 ... R5 2005 08 17 15 25 00 36.7100 126.1100 21.00 16.00 5.00 203430 TAP 2005 07 12 05 28 00 1309-91 D co CCGG 191.630 -999.990 ... R5 2005 08 18 12 25 00 36.7100 126.1100 21.00 16.00 5.00 203423 TAP 2005 07 12 05 28 00 1310-91 D co CCGG 191.460 -999.990 ... R5 2005 08 18 12 40 00 36.7100 126.1100 21.00 16.00 5.00 203424 TAP 2005 07 12 05 41 00 597-99 D co CCGG 193.990 -999.990 P.. R5 2005 08 18 11 57 00 36.7100 126.1100 21.00 16.00 5.00 203421 TAP 2005 07 12 05 41 00 598-99 D co CCGG 190.430 -999.990 P.. R5 2005 08 18 12 11 00 36.7100 126.1100 21.00 16.00 5.00 203422 TAP 2005 07 18 06 22 00 3649-99 D co CCGG 92.310 -999.990 ... R5 2005 08 22 14 28 00 36.7100 126.1100 21.00 16.00 5.00 203840 TAP 2005 07 18 06 22 00 3650-99 D co CCGG 92.850 -999.990 ... R5 2005 08 22 14 42 00 36.7100 126.1100 21.00 16.00 5.00 203841 TAP 2005 07 18 06 32 00 2447-99 D co CCGG 89.750 -999.990 P.. R5 2005 08 22 14 56 00 36.7100 126.1100 21.00 16.00 5.00 203838 TAP 2005 07 18 06 32 00 2448-99 D co CCGG 95.350 -999.990 P.. R5 2005 08 22 15 11 00 36.7100 126.1100 21.00 16.00 5.00 203839 TAP 2005 07 26 05 30 00 467-99 D co CCGG -999.990 -999.990 *.. R5 2005 08 29 10 43 00 36.7100 126.1100 21.00 16.00 5.00 204207 TAP 2005 07 26 05 30 00 467-99 D co CCGG 153.800 -999.990 ... R5 2005 08 29 12 37 00 36.7100 126.1100 21.00 16.00 5.00 204207 TAP 2005 07 26 05 30 00 468-99 D co CCGG 156.370 -999.990 ... R5 2005 08 29 10 57 00 36.7100 126.1100 21.00 16.00 5.00 204208 TAP 2005 07 26 05 46 00 3401-99 D co CCGG 161.890 -999.990 ... R5 2005 08 29 11 11 00 36.7100 126.1100 21.00 16.00 5.00 204209 TAP 2005 07 26 05 46 00 3402-99 D co CCGG 159.410 -999.990 ... R5 2005 08 29 11 26 00 36.7100 126.1100 21.00 16.00 5.00 204210 TAP 2005 08 04 05 04 00 943-99 D co CCGG 85.190 -999.990 P.. R5 2005 09 02 12 41 00 36.7100 126.1100 21.00 16.00 5.00 204475 TAP 2005 08 04 05 04 00 944-99 D co CCGG 91.090 -999.990 P.. R5 2005 09 02 12 55 00 36.7100 126.1100 21.00 16.00 5.00 204476 TAP 2005 08 04 05 15 00 75-99 D co CCGG 86.320 -999.990 ... R5 2005 09 02 12 13 00 36.7100 126.1100 21.00 16.00 5.00 204473 TAP 2005 08 04 05 15 00 76-99 D co CCGG 85.770 -999.990 ... R5 2005 09 02 12 27 00 36.7100 126.1100 21.00 16.00 5.00 204474 TAP 2005 08 09 05 41 00 2129-99 D co CCGG 325.380 -999.990 .XC R5 2005 09 02 11 44 00 36.7100 126.1100 21.00 16.00 5.00 204469 TAP 2005 08 09 05 41 00 2130-99 D co CCGG 325.700 -999.990 .XC R5 2005 09 02 11 58 00 36.7100 126.1100 21.00 16.00 5.00 204470 TAP 2005 08 09 05 52 00 2375-99 D co CCGG 326.060 -999.990 .XC R5 2005 09 02 13 09 00 36.7100 126.1100 21.00 16.00 5.00 204471 TAP 2005 08 09 05 52 00 2376-99 D co CCGG 326.500 -999.990 .XC R5 2005 09 02 13 24 00 36.7100 126.1100 21.00 16.00 5.00 204472 TAP 2005 08 16 05 02 00 1735-99 D co CCGG 126.170 -999.990 ... R5 2005 09 19 10 49 00 36.7100 126.1100 21.00 16.00 5.00 205320 TAP 2005 08 16 05 02 00 1736-99 D co CCGG 124.810 -999.990 ... R5 2005 09 19 11 03 00 36.7100 126.1100 21.00 16.00 5.00 205321 TAP 2005 08 16 05 12 00 6501-66 D co CCGG 127.170 -999.990 ... R5 2005 09 19 11 17 00 36.7100 126.1100 21.00 16.00 5.00 205318 TAP 2005 08 16 05 12 00 6502-66 D co CCGG 127.410 -999.990 ... R5 2005 09 19 11 31 00 36.7100 126.1100 21.00 16.00 5.00 205319 TAP 2005 08 23 04 40 00 2995-99 D co CCGG 143.860 -999.990 ... R5 2005 09 21 16 10 00 36.7100 126.1100 21.00 16.00 5.00 205624 TAP 2005 08 23 04 40 00 2996-99 D co CCGG 143.070 -999.990 ... R5 2005 09 21 16 25 00 36.7000 126.1000 21.00 16.00 5.00 205625 TAP 2005 08 23 04 51 00 667-99 D co CCGG 146.570 -999.990 ... R5 2005 09 21 15 42 00 36.7100 126.1100 21.00 16.00 5.00 205626 TAP 2005 08 23 04 51 00 668-99 D co CCGG 145.440 -999.990 ... R5 2005 09 21 15 56 00 36.7100 126.1100 21.00 16.00 5.00 205627 TAP 2005 08 31 05 03 00 1913-99 D co CCGG 509.200 -999.990 .XC R5 2005 10 19 12 37 00 36.7100 126.1100 21.00 16.00 5.00 206961 TAP 2005 08 31 05 03 00 1914-99 D co CCGG 510.890 -999.990 .XC R5 2005 10 19 12 51 00 36.7100 126.1100 21.00 16.00 5.00 206962 TAP 2005 08 31 05 14 00 329-99 D co CCGG 507.750 -999.990 .XC R5 2005 10 19 12 08 00 36.7100 126.1100 21.00 16.00 5.00 206959 TAP 2005 08 31 05 14 00 330-99 D co CCGG 506.310 -999.990 .XC R5 2005 10 19 12 23 00 36.7100 126.1100 21.00 16.00 5.00 206960 TAP 2005 09 08 05 35 00 1141-91 D co CCGG 147.430 -999.990 P.. R5 2005 10 19 13 34 00 36.7100 126.1100 21.00 16.00 5.00 206965 TAP 2005 09 08 05 35 00 1142-91 D co CCGG 140.950 -999.990 P.. R5 2005 10 19 13 48 00 36.7100 126.1100 21.00 16.00 5.00 206966 TAP 2005 09 08 05 48 00 693-91 D co CCGG 143.460 -999.990 P.. R5 2005 10 19 13 05 00 36.7100 126.1100 21.00 16.00 5.00 206963 TAP 2005 09 08 05 48 00 694-91 D co CCGG 140.220 -999.990 P.. R5 2005 10 19 13 20 00 36.7100 126.1100 21.00 16.00 5.00 206964 TAP 2005 09 14 05 22 00 6779-66 D co CCGG 189.340 -999.990 P.. R5 2005 11 08 12 38 00 36.7100 126.1100 21.00 16.00 5.00 208060 TAP 2005 09 14 05 22 00 6780-66 D co CCGG 184.990 -999.990 P.. R5 2005 11 08 12 53 00 36.7100 126.1100 21.00 16.00 5.00 208061 TAP 2005 09 14 05 48 00 3079-99 D co CCGG 158.530 -999.990 P.. R5 2005 11 08 13 07 00 36.7100 126.1100 21.00 16.00 5.00 208062 TAP 2005 09 14 05 48 00 3080-99 D co CCGG 169.610 -999.990 P.. R5 2005 11 08 13 21 00 36.7100 126.1100 21.00 16.00 5.00 208063 TAP 2005 09 22 06 30 00 3895-99 D co CCGG 143.040 -999.990 ... R5 2005 11 08 12 10 00 36.7100 126.1100 21.00 16.00 5.00 208047 TAP 2005 09 22 06 30 00 3896-99 D co CCGG 142.960 -999.990 ... R5 2005 11 08 12 24 00 36.7100 126.1100 21.00 16.00 5.00 208048 TAP 2005 10 06 05 52 00 1393-99 D co CCGG 346.020 -999.990 .XC R5 2005 11 11 10 42 00 36.7100 126.1100 21.00 16.00 5.00 208574 TAP 2005 10 06 05 52 00 1394-99 D co CCGG 348.410 -999.990 .XC R5 2005 11 11 10 56 00 36.7100 126.1100 21.00 16.00 5.00 208575 TAP 2005 10 06 06 05 00 3815-99 D co CCGG 361.140 -999.990 P.C R5 2005 11 11 11 39 00 36.7100 126.1100 21.00 16.00 5.00 208572 TAP 2005 10 06 06 05 00 3816-99 D co CCGG 355.450 -999.990 P.C R5 2005 11 11 11 53 00 36.7100 126.1100 21.00 16.00 5.00 208573 TAP 2005 10 11 05 21 00 3941-99 D co CCGG 177.860 -999.990 ... R5 2005 11 15 08 53 00 36.7100 126.1100 21.00 16.00 5.00 208324 TAP 2005 10 11 05 21 00 3942-99 D co CCGG 177.600 -999.990 ... R5 2005 11 15 09 07 00 36.7100 126.1100 21.00 16.00 5.00 208325 TAP 2005 10 11 05 32 00 3715-99 D co CCGG 190.600 -999.990 ... R5 2005 11 15 11 18 00 36.7100 126.1100 21.00 16.00 5.00 208322 TAP 2005 10 11 05 32 00 3716-99 D co CCGG 189.280 -999.990 ... R5 2005 11 15 11 32 00 36.7100 126.1100 21.00 16.00 5.00 208323 TAP 2005 10 17 04 52 00 2769-99 D co CCGG 234.470 -999.990 ..C R5 2005 11 17 14 01 00 36.7100 126.1100 21.00 16.00 5.00 208617 TAP 2005 10 17 04 52 00 2770-99 D co CCGG 234.440 -999.990 ..C R5 2005 11 17 14 16 00 36.7100 126.1100 21.00 16.00 5.00 208618 TAP 2005 10 17 05 03 00 3739-99 D co CCGG 240.310 -999.990 ..C R5 2005 11 17 13 33 00 36.7100 126.1100 21.00 16.00 5.00 208619 TAP 2005 10 17 05 03 00 3740-99 D co CCGG 240.830 -999.990 ..C R5 2005 11 17 13 47 00 36.7100 126.1100 21.00 16.00 5.00 208620 TAP 2005 10 24 05 25 00 2647-99 D co CCGG 614.340 -999.990 .XC R5 2005 12 20 15 07 00 36.7100 126.1100 21.00 16.00 5.00 210429 TAP 2005 10 24 05 25 00 2648-99 D co CCGG 612.180 -999.990 .XC R5 2005 12 20 15 21 00 36.7100 126.1100 21.00 16.00 5.00 210430 TAP 2005 10 24 05 35 00 4181-99 D co CCGG 572.690 -999.990 .XC R5 2005 12 20 14 10 00 36.7100 126.1100 21.00 16.00 5.00 210431 TAP 2005 10 24 05 35 00 4182-99 D co CCGG 573.050 -999.990 .XC R5 2005 12 20 14 24 00 36.7100 126.1100 21.00 16.00 5.00 210432 TAP 2005 10 31 06 13 00 6185-66 D co CCGG 182.900 -999.990 ... R5 2005 12 21 11 17 00 36.7100 126.1100 21.00 16.00 5.00 210419 TAP 2005 10 31 06 13 00 6186-66 D co CCGG 184.470 -999.990 ... R5 2005 12 21 11 32 00 36.7100 126.1100 21.00 16.00 5.00 210420 TAP 2005 10 31 06 25 00 3925-99 D co CCGG 182.900 -999.990 ... R5 2005 12 21 10 49 00 36.7100 126.1100 21.00 16.00 5.00 210417 TAP 2005 10 31 06 25 00 3926-99 D co CCGG 183.450 -999.990 ... R5 2005 12 21 11 03 00 36.7100 126.1100 21.00 16.00 5.00 210418 TAP 2006 01 03 05 05 00 1875-99 G co CCGG 236.360 -999.990 ..C R5 2006 02 03 12 20 00 36.7100 126.1100 21.00 16.00 5.00 212013 TAP 2006 01 03 05 05 00 1876-99 G co CCGG 235.630 -999.990 ..C R5 2006 02 03 12 34 00 36.7100 126.1100 21.00 16.00 5.00 212014 TAP 2006 01 03 05 19 00 3677-99 G co CCGG 243.710 -999.990 ..C R5 2006 02 03 11 51 00 36.7100 126.1100 21.00 16.00 5.00 212011 TAP 2006 01 03 05 19 00 3678-99 G co CCGG 244.630 -999.990 ..C R5 2006 02 03 12 06 00 36.7100 126.1100 21.00 16.00 5.00 212012 TAP 2006 01 04 08 02 00 2465-99 G co CCGG 190.830 -999.990 ... R5 2006 03 07 11 38 00 36.7100 126.1100 21.00 16.00 5.00 213459 TAP 2006 01 04 08 02 00 2466-99 G co CCGG 190.930 -999.990 ... R5 2006 03 07 11 52 00 36.7100 126.1100 21.00 16.00 5.00 213460 TAP 2006 01 04 08 16 00 6571-66 G co CCGG 190.670 -999.990 ... R5 2006 03 07 11 09 00 36.7100 126.1100 21.00 16.00 5.00 213461 TAP 2006 01 04 08 16 00 6572-66 G co CCGG 191.430 -999.990 ... R5 2006 03 07 11 23 00 36.7100 126.1100 21.00 16.00 5.00 213462 TAP 2006 02 12 04 24 00 1801-99 G co CCGG 231.030 -999.990 ..C R5 2006 03 09 15 53 00 36.7100 126.1100 21.00 16.00 5.00 213612 TAP 2006 02 12 04 24 00 1802-99 G co CCGG 231.410 -999.990 ..C R5 2006 03 09 16 07 00 36.7100 126.1100 21.00 16.00 5.00 213613 TAP 2006 02 12 04 38 00 6261-66 G co CCGG 227.800 -999.990 ... R5 2006 03 09 16 21 00 36.7100 126.1100 21.00 16.00 5.00 213614 TAP 2006 02 12 04 38 00 6262-66 G co CCGG 228.250 -999.990 ... R5 2006 03 09 16 36 00 36.7100 126.1100 21.00 16.00 5.00 213615 TAP 2006 02 17 03 35 00 1105-99 G co CCGG 212.740 -999.990 ... R5 2006 03 10 09 23 00 36.7100 126.1100 21.00 16.00 5.00 213661 TAP 2006 02 17 03 35 00 1106-99 G co CCGG 213.180 -999.990 ... R5 2006 03 10 09 37 00 36.7100 126.1100 21.00 16.00 5.00 213662 TAP 2006 02 17 03 49 00 1433-99 G co CCGG 212.490 -999.990 ... R5 2006 03 10 09 52 00 36.7100 126.1100 21.00 16.00 5.00 213659 TAP 2006 02 17 03 49 00 1434-99 G co CCGG 212.440 -999.990 ... R5 2006 03 10 10 06 00 36.7100 126.1100 21.00 16.00 5.00 213660 TAP 2006 02 22 04 46 00 424-99 G co CCGG 247.500 -999.990 ..C R5 2006 03 10 10 20 00 36.7100 126.1100 21.00 16.00 5.00 213656 TAP 2006 02 22 04 59 00 1039-99 G co CCGG 237.890 -999.990 ..C R5 2006 03 10 08 55 00 36.7100 126.1100 21.00 16.00 5.00 213657 TAP 2006 02 22 04 59 00 1040-99 G co CCGG 238.540 -999.990 ..C R5 2006 03 10 09 09 00 36.7100 126.1100 21.00 16.00 5.00 213658 TAP 2006 03 06 05 54 00 1911-99 G co CCGG 530.610 -999.990 .XC R5 2006 03 20 15 18 00 36.7100 126.1100 21.00 16.00 5.00 214100 TAP 2006 03 06 05 54 00 4127-99 G co CCGG 531.290 -999.990 .XC R5 2006 03 20 15 03 00 36.7100 126.1100 21.00 16.00 5.00 214101 TAP 2006 03 06 06 07 00 1912-99 G co CCGG 525.970 -999.990 .XC R5 2006 03 20 15 46 00 36.7100 126.1100 21.00 16.00 5.00 214102 TAP 2006 03 06 06 07 00 4128-99 G co CCGG 527.310 -999.990 .XC R5 2006 03 20 15 32 00 36.7100 126.1100 21.00 16.00 5.00 214103 TAP 2006 03 12 04 18 00 227-99 G co CCGG 195.110 -999.990 ... R5 2006 04 06 11 01 00 36.7100 126.1100 21.00 16.00 5.00 214811 TAP 2006 03 12 04 18 00 228-99 G co CCGG 194.180 -999.990 ... R5 2006 04 06 11 15 00 36.7100 126.1100 21.00 16.00 5.00 214812 TAP 2006 03 12 04 32 00 3055-99 G co CCGG 194.040 -999.990 ... R5 2006 04 06 10 32 00 36.7100 126.1100 21.00 16.00 5.00 214809 TAP 2006 03 12 04 32 00 3056-99 G co CCGG 194.550 -999.990 ... R5 2006 04 06 10 47 00 36.7100 126.1100 21.00 16.00 5.00 214810 TAP 2006 03 19 07 16 00 4625-99 G co CCGG 200.710 -999.990 ... R5 2006 04 12 11 35 00 36.7100 126.1100 21.00 16.00 5.00 215185 TAP 2006 03 19 07 30 00 6921-66 G co CCGG 162.360 -999.990 P.. R5 2006 04 12 11 06 00 36.7100 126.1100 21.00 16.00 5.00 215183 TAP 2006 03 19 07 30 00 6922-66 G co CCGG 172.070 -999.990 P.. R5 2006 04 12 11 21 00 36.7100 126.1100 21.00 16.00 5.00 215184 TAP 2006 03 23 06 35 00 1669-99 G co CCGG 214.410 -999.990 ... R5 2006 04 06 10 04 00 36.7100 126.1100 21.00 16.00 5.00 214807 TAP 2006 03 23 06 35 00 1670-99 G co CCGG 213.520 -999.990 ... R5 2006 04 06 10 18 00 36.7100 126.1100 21.00 16.00 5.00 214808 TAP 2006 03 23 06 49 00 427-99 G co CCGG 213.310 -999.990 ... R5 2006 04 06 09 35 00 36.7100 126.1100 21.00 16.00 5.00 214805 TAP 2006 03 23 06 49 00 428-99 G co CCGG 213.060 -999.990 ... R5 2006 04 06 09 50 00 36.7100 126.1100 21.00 16.00 5.00 214806 TAP 2006 03 30 08 07 00 971-99 G co CCGG 195.010 -999.990 ... R5 2006 04 14 10 18 00 36.7100 126.1100 21.00 16.00 5.00 215340 TAP 2006 03 30 08 07 00 972-99 G co CCGG 195.440 -999.990 ... R5 2006 04 14 10 32 00 36.7100 126.1100 21.00 16.00 5.00 215341 TAP 2006 03 30 08 21 00 6339-66 G co CCGG 185.170 -999.990 P.. R5 2006 04 14 10 47 00 36.7100 126.1100 21.00 16.00 5.00 215342 TAP 2006 03 30 08 21 00 6340-66 G co CCGG 173.180 -999.990 P.. R5 2006 04 14 11 01 00 36.7100 126.1100 21.00 16.00 5.00 215343 TAP 2006 04 05 05 30 00 3817-99 G co CCGG 302.360 -999.990 ..C R5 2006 05 03 11 30 00 36.7100 126.1100 21.00 16.00 5.00 216072 TAP 2006 04 05 05 30 00 3818-99 G co CCGG 302.430 -999.990 ..C R5 2006 05 03 11 44 00 36.7100 126.1100 21.00 16.00 5.00 216073 TAP 2006 04 05 05 46 00 6075-66 G co CCGG 163.070 -999.990 P.. R5 2006 05 03 11 01 00 36.7100 126.1100 21.00 16.00 5.00 216070 TAP 2006 04 05 05 46 00 6076-66 G co CCGG 178.980 -999.990 P.. R5 2006 05 03 11 15 00 36.7100 126.1100 21.00 16.00 5.00 216071 TAP 2006 04 13 04 35 00 885-99 G co CCGG 289.410 -999.990 ..C R5 2006 05 08 16 00 00 36.7100 126.1100 21.00 16.00 5.00 216228 TAP 2006 04 13 04 35 00 886-99 G co CCGG 287.670 -999.990 ..C R5 2006 05 08 16 14 00 36.7100 126.1100 21.00 16.00 5.00 216229 TAP 2006 04 13 04 48 00 6185-66 G co CCGG 281.450 -999.990 ..C R5 2006 05 08 15 32 00 36.7100 126.1100 21.00 16.00 5.00 216226 TAP 2006 04 13 04 48 00 6186-66 G co CCGG 282.210 -999.990 ..C R5 2006 05 08 15 46 00 36.7100 126.1100 21.00 16.00 5.00 216227 TAP 2006 04 20 05 41 00 1079-99 G co CCGG 178.080 -999.990 P.. R5 2006 05 22 13 39 00 36.7100 126.1100 21.00 16.00 5.00 216791 TAP 2006 04 20 05 41 00 1080-99 G co CCGG 155.330 -999.990 P.. R5 2006 05 22 13 54 00 36.7100 126.1100 21.00 16.00 5.00 216792 TAP 2006 04 20 05 56 00 1289-99 G co CCGG 193.270 -999.990 P.. R5 2006 05 22 13 11 00 36.7100 126.1100 21.00 16.00 5.00 216789 TAP 2006 04 20 05 56 00 1290-99 G co CCGG 161.480 -999.990 P.. R5 2006 05 22 13 25 00 36.7100 126.1100 21.00 16.00 5.00 216790 TAP 2006 05 03 04 35 00 817-99 G co CCGG 180.360 -999.990 P.. R5 2006 06 08 13 20 00 36.7100 126.1100 21.00 16.00 5.00 217479 TAP 2006 05 03 04 35 00 818-99 G co CCGG 162.780 -999.990 P.. R5 2006 06 08 13 34 00 36.7100 126.1100 21.00 16.00 5.00 217480 TAP 2006 05 03 04 48 00 2185-99 G co CCGG 272.730 -999.990 ..C R5 2006 06 08 13 48 00 36.7100 126.1100 21.00 16.00 5.00 217481 TAP 2006 05 03 04 48 00 2186-99 G co CCGG 271.590 -999.990 ..C R5 2006 06 08 14 02 00 36.7100 126.1100 21.00 16.00 5.00 217482 TAP 2006 05 11 06 08 00 2399-99 G co CCGG 212.110 -999.990 ... R5 2006 06 08 12 51 00 36.7100 126.1100 21.00 16.00 5.00 217477 TAP 2006 05 11 06 08 00 2400-99 G co CCGG 211.250 -999.990 ... R5 2006 06 08 13 05 00 36.7100 126.1100 21.00 16.00 5.00 217478 TAP 2006 05 11 06 20 00 1253-99 G co CCGG 209.080 -999.990 ... R5 2006 06 08 12 23 00 36.7100 126.1100 21.00 16.00 5.00 217475 TAP 2006 05 11 06 20 00 1254-99 G co CCGG 210.250 -999.990 ... R5 2006 06 08 12 37 00 36.7100 126.1100 21.00 16.00 5.00 217476 TAP 2006 05 23 08 15 00 1449-99 G co CCGG 511.270 -999.990 .XC R5 2006 06 28 13 21 00 36.7100 126.1100 21.00 16.00 5.00 218242 TAP 2006 05 23 08 15 00 1450-99 G co CCGG 511.440 -999.990 .XC R5 2006 06 28 13 35 00 36.7100 126.1100 21.00 16.00 5.00 218243 TAP 2006 05 23 08 27 00 2829-99 G co CCGG 510.540 -999.990 .XC R5 2006 06 28 14 50 00 36.7100 126.1100 21.00 16.00 5.00 218240 TAP 2006 05 23 08 27 00 2830-99 G co CCGG 509.870 -999.990 .XC R5 2006 06 28 15 05 00 36.7100 126.1100 21.00 16.00 5.00 218241 TAP 2006 05 30 06 20 00 1583-99 G co CCGG 513.530 -999.990 .XC R5 2006 07 06 09 44 00 36.7100 126.1100 21.00 16.00 5.00 218464 TAP 2006 05 30 06 20 00 1584-99 G co CCGG 514.130 -999.990 .XC R5 2006 07 06 09 58 00 36.7100 126.1100 21.00 16.00 5.00 218465 TAP 2006 05 30 06 35 00 6195-66 G co CCGG 522.690 -999.990 .XC R5 2006 07 06 10 13 00 36.7100 126.1100 21.00 16.00 5.00 218462 TAP 2006 05 30 06 35 00 6196-66 G co CCGG 525.190 -999.990 .XC R5 2006 07 06 10 27 00 36.7100 126.1100 21.00 16.00 5.00 218463 TAP 2006 06 04 04 28 00 77-99 G co CCGG 162.390 -999.990 P.. R5 2006 07 06 08 47 00 36.7100 126.1100 21.00 16.00 5.00 218458 TAP 2006 06 04 04 28 00 78-99 G co CCGG 165.900 -999.990 P.. R5 2006 07 06 09 02 00 36.7100 126.1100 21.00 16.00 5.00 218459 TAP 2006 06 04 04 40 00 3169-99 G co CCGG 162.240 -999.990 P.. R5 2006 07 06 09 16 00 36.7100 126.1100 21.00 16.00 5.00 218460 TAP 2006 06 04 04 40 00 3170-99 G co CCGG 165.870 -999.990 P.. R5 2006 07 06 09 30 00 36.7100 126.1100 21.00 16.00 5.00 218461 TAP 2006 06 15 05 42 00 3917-99 G co CCGG 225.600 -999.990 ... R5 2006 08 01 10 22 00 36.7100 126.1100 21.00 16.00 5.00 219854 TAP 2006 06 15 05 42 00 3918-99 G co CCGG 225.030 -999.990 ... R5 2006 08 01 10 36 00 36.7100 126.1100 21.00 16.00 5.00 219855 TAP 2006 06 27 06 30 00 671-99 G co CCGG 317.120 -999.990 ..C R5 2006 08 01 15 07 00 36.7100 126.1100 21.00 16.00 5.00 219868 TAP 2006 06 27 06 30 00 672-99 G co CCGG 316.450 -999.990 ..C R5 2006 08 01 15 21 00 36.7100 126.1100 21.00 16.00 5.00 219869 TAP 2006 06 27 06 44 00 1991-99 G co CCGG 321.230 -999.990 ..C R5 2006 08 01 14 38 00 36.7100 126.1100 21.00 16.00 5.00 219866 TAP 2006 06 27 06 44 00 1992-99 G co CCGG 324.480 -999.990 ..C R5 2006 08 01 14 53 00 36.7100 126.1100 21.00 16.00 5.00 219867 TAP 2006 07 01 05 23 00 1469-99 G co CCGG 124.400 -999.990 ... R5 2006 08 01 13 41 00 36.7100 126.1100 21.00 16.00 5.00 219862 TAP 2006 07 01 05 23 00 1470-99 G co CCGG 125.040 -999.990 ... R5 2006 08 01 13 56 00 36.7100 126.1100 21.00 16.00 5.00 219863 TAP 2006 07 01 05 37 00 1551-99 G co CCGG 125.710 -999.990 ... R5 2006 08 01 14 10 00 36.7100 126.1100 21.00 16.00 5.00 219864 TAP 2006 07 01 05 37 00 1552-99 G co CCGG 126.550 -999.990 ... R5 2006 08 01 14 24 00 36.7100 126.1100 21.00 16.00 5.00 219865 TAP 2006 07 05 05 26 00 3123-99 G co CCGG 298.830 -999.990 ..C R5 2006 08 15 14 14 00 36.7100 126.1100 21.00 16.00 5.00 220300 TAP 2006 07 05 05 26 00 3124-99 G co CCGG 299.630 -999.990 ..C R5 2006 08 15 14 28 00 36.7100 126.1100 21.00 16.00 5.00 220301 TAP 2006 07 05 05 39 00 2893-99 G co CCGG 302.640 -999.990 ..C R5 2006 08 15 13 46 00 36.7100 126.1100 21.00 16.00 5.00 220302 TAP 2006 07 05 05 39 00 2894-99 G co CCGG 302.510 -999.990 ..C R5 2006 08 15 14 00 00 36.7100 126.1100 21.00 16.00 5.00 220303 TAP 2006 07 15 06 13 00 3041-99 G co CCGG 87.840 -999.990 ... R5 2006 08 15 13 17 00 36.7100 126.1100 21.00 16.00 5.00 220296 TAP 2006 07 15 06 13 00 3042-99 G co CCGG 88.090 -999.990 ... R5 2006 08 15 13 31 00 36.7100 126.1100 21.00 16.00 5.00 220297 TAP 2006 07 15 06 26 00 3839-99 G co CCGG 91.440 -999.990 ... R5 2006 08 15 12 49 00 36.7100 126.1100 21.00 16.00 5.00 220298 TAP 2006 07 15 06 26 00 3840-99 G co CCGG 91.550 -999.990 ... R5 2006 08 15 13 03 00 36.7100 126.1100 21.00 16.00 5.00 220299 TAP 2006 07 22 04 25 00 6493-66 G co CCGG 366.400 -999.990 .XC R5 2006 08 31 10 06 00 36.7100 126.1100 21.00 16.00 5.00 221244 TAP 2006 07 22 04 25 00 6494-66 G co CCGG 363.530 -999.990 .XC R5 2006 08 31 10 20 00 36.7100 126.1100 21.00 16.00 5.00 221245 TAP 2006 07 22 04 40 00 2533-99 G co CCGG 336.570 -999.990 .XC R5 2006 08 31 10 34 00 36.7100 126.1100 21.00 16.00 5.00 221242 TAP 2006 07 22 04 40 00 2534-99 G co CCGG 334.520 -999.990 .XC R5 2006 08 31 10 48 00 36.7100 126.1100 21.00 16.00 5.00 221243 TAP 2006 07 30 05 42 00 6593-66 G co CCGG 71.040 -999.990 ... R5 2006 08 30 14 02 00 36.7100 126.1100 21.00 16.00 5.00 221240 TAP 2006 07 30 05 42 00 6594-66 G co CCGG 70.340 -999.990 ... R5 2006 08 30 14 16 00 36.7100 126.1100 21.00 16.00 5.00 221241 TAP 2006 07 30 05 55 00 2183-99 G co CCGG 100.840 -999.990 P.. R5 2006 08 30 14 30 00 36.7100 126.1100 21.00 16.00 5.00 221238 TAP 2006 07 30 05 55 00 2184-99 G co CCGG 76.160 -999.990 P.. R5 2006 08 30 14 44 00 36.7100 126.1100 21.00 16.00 5.00 221239 TAP 2006 08 03 05 18 00 533-99 G co CCGG 98.780 -999.990 P.. R5 2006 09 06 12 39 00 36.7100 126.1100 21.00 16.00 5.00 221624 TAP 2006 08 03 05 18 00 534-99 G co CCGG 115.560 -999.990 P.. R5 2006 09 06 12 53 00 36.7100 126.1100 21.00 16.00 5.00 221625 TAP 2006 08 03 05 35 00 2089-99 G co CCGG 135.120 -999.990 P.. R5 2006 09 06 12 11 00 36.7100 126.1100 21.00 16.00 5.00 221626 TAP 2006 08 03 05 35 00 2090-99 G co CCGG 145.140 -999.990 P.. R5 2006 09 06 12 25 00 36.7100 126.1100 21.00 16.00 5.00 221627 TAP 2006 08 14 05 47 00 3331-99 G co CCGG 90.120 -999.990 ... R5 2006 09 06 11 14 00 36.7100 126.1100 21.00 16.00 5.00 221620 TAP 2006 08 14 05 47 00 3332-99 G co CCGG 88.770 -999.990 ... R5 2006 09 06 11 28 00 36.7100 126.1100 21.00 16.00 5.00 221621 TAP 2006 08 14 06 02 00 31-99 G co CCGG 89.780 -999.990 ... R5 2006 09 06 11 42 00 36.7100 126.1100 21.00 16.00 5.00 221622 TAP 2006 08 14 06 02 00 32-99 G co CCGG 87.150 -999.990 ... R5 2006 09 06 11 56 00 36.7100 126.1100 21.00 16.00 5.00 221623 TAP 2006 08 28 05 17 00 231-99 G co CCGG 508.620 -999.990 .XC R5 2006 09 26 15 04 00 36.7100 126.1100 21.00 16.00 5.00 222578 TAP 2006 08 28 05 17 00 232-99 G co CCGG 515.890 -999.990 .XC R5 2006 09 26 15 18 00 36.7100 126.1100 21.00 16.00 5.00 222579 TAP 2006 08 28 05 30 00 2145-99 G co CCGG 551.780 -999.990 .XC R5 2006 09 27 10 27 00 36.7100 126.1100 21.00 16.00 5.00 222580 TAP 2006 08 28 05 30 00 2146-99 G co CCGG 549.860 -999.990 .XC R5 2006 09 27 10 41 00 36.7100 126.1100 21.00 16.00 5.00 222581 TAP 2006 09 03 05 21 00 1423-99 G co CCGG 248.850 -999.990 ..C R5 2006 10 05 13 35 00 36.7100 126.1100 21.00 16.00 5.00 222967 TAP 2006 09 03 05 21 00 1424-99 G co CCGG 248.140 -999.990 ..C R5 2006 10 05 13 49 00 36.7100 126.1100 21.00 16.00 5.00 222968 TAP 2006 09 03 05 46 00 3989-99 G co CCGG 251.740 -999.990 ..C R5 2006 10 05 13 07 00 36.7100 126.1100 21.00 16.00 5.00 222965 TAP 2006 09 03 05 46 00 3990-99 G co CCGG 251.960 -999.990 ..C R5 2006 10 05 13 21 00 36.7100 126.1100 21.00 16.00 5.00 222966 TAP 2006 09 08 05 06 00 3095-99 G co CCGG 152.750 -999.990 ... R5 2006 10 10 11 38 00 36.7100 126.1100 21.00 16.00 5.00 223099 TAP 2006 09 08 05 06 00 3096-99 G co CCGG 151.680 -999.990 ... R5 2006 10 10 11 53 00 36.7100 126.1100 21.00 16.00 5.00 223100 TAP 2006 09 08 05 20 00 1787-99 G co CCGG 160.800 -999.990 ... R5 2006 10 10 12 07 00 36.7100 126.1100 21.00 16.00 5.00 223101 TAP 2006 09 08 05 20 00 1788-99 G co CCGG 158.890 -999.990 ... R5 2006 10 10 12 21 00 36.7100 126.1100 21.00 16.00 5.00 223102 TAP 2006 09 14 05 00 00 829-99 G co CCGG 181.230 -999.990 P.. R5 2006 10 10 13 04 00 36.7100 126.1100 21.00 16.00 5.00 223103 TAP 2006 09 14 05 00 00 830-99 G co CCGG 184.610 -999.990 P.. R5 2006 10 10 13 18 00 36.7100 126.1100 21.00 16.00 5.00 223104 TAP 2006 09 14 05 15 00 2549-99 G co CCGG 191.080 -999.990 ... R5 2006 10 10 12 35 00 36.7100 126.1100 21.00 16.00 5.00 223105 TAP 2006 09 14 05 15 00 2550-99 G co CCGG 191.470 -999.990 ... R5 2006 10 10 12 50 00 36.7100 126.1100 21.00 16.00 5.00 223106 TAP 2006 09 27 05 22 00 3479-99 G co CCGG 340.440 -999.990 ..C R5 2006 11 01 12 37 00 36.7100 126.1100 21.00 16.00 5.00 224178 TAP 2006 09 27 05 22 00 3480-99 G co CCGG 340.550 -999.990 ..C R5 2006 11 01 12 51 00 36.7100 126.1100 21.00 16.00 5.00 224179 TAP 2006 09 27 05 37 00 1205-99 G co CCGG 336.290 -999.990 ..C R5 2006 11 01 12 09 00 36.7100 126.1100 21.00 16.00 5.00 224180 TAP 2006 09 27 05 37 00 1206-99 G co CCGG 337.680 -999.990 ..C R5 2006 11 01 12 23 00 36.7100 126.1100 21.00 16.00 5.00 224181 TAP 2006 10 10 07 15 00 1427-99 G co CCGG 212.480 -999.990 ... R5 2006 11 01 13 34 00 36.7100 126.1100 21.00 16.00 5.00 224184 TAP 2006 10 10 07 15 00 1428-99 G co CCGG 213.180 -999.990 ... R5 2006 11 01 13 48 00 36.7100 126.1100 21.00 16.00 5.00 224185 TAP 2006 10 10 07 28 00 4117-99 G co CCGG 212.790 -999.990 ... R5 2006 11 01 13 06 00 36.7100 126.1100 21.00 16.00 5.00 224182 TAP 2006 10 10 07 28 00 4118-99 G co CCGG 213.540 -999.990 ... R5 2006 11 01 13 20 00 36.7100 126.1100 21.00 16.00 5.00 224183 TAP 2006 10 21 06 55 00 1951-99 G co CCGG 368.600 -999.990 P.C R5 2006 11 09 12 09 00 36.7100 126.1100 21.00 16.00 5.00 224724 TAP 2006 10 21 06 55 00 1952-99 G co CCGG 369.270 -999.990 P.C R5 2006 11 09 12 24 00 36.7100 126.1100 21.00 16.00 5.00 224725 TAP 2006 10 21 07 08 00 3257-99 G co CCGG 374.300 -999.990 .XC R5 2006 11 09 12 38 00 36.7100 126.1100 21.00 16.00 5.00 224722 TAP 2006 10 21 07 08 00 3258-99 G co CCGG 374.290 -999.990 .XC R5 2006 11 09 12 52 00 36.7100 126.1100 21.00 16.00 5.00 224723 TAP 2006 10 30 05 45 00 4141-99 G co CCGG 241.790 -999.990 ..C R5 2006 11 20 11 57 00 36.7100 126.1100 21.00 16.00 5.00 225221 TAP 2006 10 30 05 45 00 4142-99 G co CCGG 241.290 -999.990 ..C R5 2006 11 20 12 11 00 36.7100 126.1100 21.00 16.00 5.00 225222 TAP 2006 10 30 06 00 00 2101-99 G co CCGG 230.600 -999.990 ..C R5 2006 11 20 12 25 00 36.7100 126.1100 21.00 16.00 5.00 225223 TAP 2006 10 30 06 00 00 2102-99 G co CCGG 232.390 -999.990 ..C R5 2006 11 20 12 39 00 36.7100 126.1100 21.00 16.00 5.00 225224 TAP 2006 11 07 04 43 00 3841-99 G co CCGG 139.090 -999.990 ... R5 2006 12 12 11 07 00 36.7100 126.1100 21.00 16.00 5.00 226145 TAP 2006 11 07 04 43 00 3842-99 G co CCGG 138.760 -999.990 ... R5 2006 12 12 11 21 00 36.7100 126.1100 21.00 16.00 5.00 226146 TAP 2006 11 12 05 54 00 67-99 G co CCGG 250.800 -999.990 ..C R5 2006 12 08 10 52 00 36.7100 126.1100 21.00 16.00 5.00 225965 TAP 2006 11 12 05 54 00 68-99 G co CCGG 251.010 -999.990 ..C R5 2006 12 08 11 06 00 36.7100 126.1100 21.00 16.00 5.00 225966 TAP 2006 11 12 06 09 00 1-99 G co CCGG 248.310 -999.990 ..C R5 2006 12 08 09 55 00 36.7100 126.1100 21.00 16.00 5.00 225978 TAP 2006 11 12 06 09 00 2-99 G co CCGG 248.180 -999.990 ..C R5 2006 12 08 10 09 00 36.7100 126.1100 21.00 16.00 5.00 225979 TAP 2006 11 28 06 02 00 277-99 G co CCGG 192.520 -999.990 ... R5 2007 01 16 11 06 00 36.7100 126.1100 21.00 16.00 5.00 226805 TAP 2006 11 28 06 02 00 278-99 G co CCGG 190.850 -999.990 ... R5 2007 01 16 11 21 00 36.7100 126.1100 21.00 16.00 5.00 226806 TAP 2006 11 28 06 14 00 1143-99 G co CCGG 209.530 -999.990 ... R5 2007 01 16 10 38 00 36.7100 126.1100 21.00 16.00 5.00 226807 TAP 2006 11 28 06 14 00 1144-99 G co CCGG 208.280 -999.990 ... R5 2007 01 16 10 52 00 36.7100 126.1100 21.00 16.00 5.00 226808 TAP 2006 12 10 03 10 00 3591-99 G co CCGG 189.870 -999.990 ... R5 2007 01 31 13 46 00 36.7100 126.1100 21.00 16.00 5.00 227810 TAP 2006 12 10 03 10 00 3592-99 G co CCGG 188.800 -999.990 ... R5 2007 01 31 14 00 00 36.7100 126.1100 21.00 16.00 5.00 227811 TAP 2006 12 10 03 25 00 2675-99 G co CCGG 189.410 -999.990 ... R5 2007 01 31 14 14 00 36.7100 126.1100 21.00 16.00 5.00 227808 TAP 2006 12 10 03 25 00 2676-99 G co CCGG 189.640 -999.990 ... R5 2007 01 31 14 29 00 36.7100 126.1100 21.00 16.00 5.00 227809 TAP 2006 12 14 07 32 00 471-99 G co CCGG 437.010 -999.990 .XC R5 2007 02 05 13 22 00 36.7100 126.1100 21.00 16.00 5.00 228149 TAP 2006 12 14 07 32 00 472-99 G co CCGG 437.690 -999.990 .XC R5 2007 02 05 13 36 00 36.7100 126.1100 21.00 16.00 5.00 228150 TAP 2006 12 14 07 47 00 171-99 G co CCGG 426.460 -999.990 .XC R5 2007 02 05 12 54 00 36.7100 126.1100 21.00 16.00 5.00 228147 TAP 2006 12 14 07 47 00 172-99 G co CCGG 424.680 -999.990 .XC R5 2007 02 05 13 08 00 36.7100 126.1100 21.00 16.00 5.00 228148 TAP 2006 12 26 07 16 00 3631-99 G co CCGG 335.060 -999.990 ..C R5 2007 03 05 09 50 00 36.7100 126.1100 21.00 16.00 5.00 230065 TAP 2006 12 26 07 16 00 3632-99 G co CCGG 335.060 -999.990 ..C R5 2007 03 05 10 04 00 36.7100 126.1100 21.00 16.00 5.00 230066 TAP 2006 12 26 07 30 00 3661-99 G co CCGG 328.930 -999.990 ..C R5 2007 03 05 10 19 00 36.7100 126.1100 21.00 16.00 5.00 230059 TAP 2006 12 26 07 30 00 3662-99 G co CCGG 330.290 -999.990 ..C R5 2007 03 05 10 33 00 36.7100 126.1100 21.00 16.00 5.00 230060 TAP 2007 01 09 08 06 00 1677-99 G co CCGG 190.700 -999.990 ... R5 2007 02 28 10 45 00 36.7100 126.1100 21.00 16.00 5.00 229556 TAP 2007 01 09 08 06 00 1678-99 G co CCGG 190.330 -999.990 ... R5 2007 02 28 11 00 00 36.7100 126.1100 21.00 16.00 5.00 229557 TAP 2007 01 13 04 40 00 3791-99 G co CCGG 199.080 -999.990 ... R5 2007 03 09 12 56 00 36.7100 126.1100 21.00 16.00 5.00 230240 TAP 2007 01 13 04 40 00 3792-99 G co CCGG 198.500 -999.990 ... R5 2007 03 09 13 10 00 36.7100 126.1100 21.00 16.00 5.00 230241 TAP 2007 01 13 04 53 00 473-99 G co CCGG 195.130 -999.990 ... R5 2007 03 09 13 24 00 36.7100 126.1100 21.00 16.00 5.00 230242 TAP 2007 01 13 04 53 00 474-99 G co CCGG 194.960 -999.990 ... R5 2007 03 09 13 38 00 36.7100 126.1100 21.00 16.00 5.00 230243 TAP 2007 01 24 08 22 00 243-99 G co CCGG 327.520 -999.990 ..C R5 2007 03 05 08 53 00 36.7100 126.1100 21.00 16.00 5.00 230061 TAP 2007 01 24 08 22 00 244-99 G co CCGG 325.360 -999.990 ..C R5 2007 03 05 09 07 00 36.7100 126.1100 21.00 16.00 5.00 230062 TAP 2007 01 24 08 35 00 3175-99 G co CCGG 349.930 -999.990 ..C R5 2007 03 05 09 22 00 36.7100 126.1100 21.00 16.00 5.00 230063 TAP 2007 01 24 08 35 00 3176-99 G co CCGG 349.710 -999.990 ..C R5 2007 03 05 09 36 00 36.7100 126.1100 21.00 16.00 5.00 230064 TAP 2007 02 09 03 47 00 3559-99 G co CCGG -999.990 -999.990 *.. R5 2007 03 19 09 52 00 36.7100 126.1100 21.00 16.00 5.00 230677 TAP 2007 02 09 03 47 00 3560-99 G co CCGG -999.990 -999.990 *.. R5 2007 03 19 10 06 00 36.7100 126.1100 21.00 16.00 5.00 230678 TAP 2007 02 09 04 11 00 6497-66 G co CCGG -999.990 -999.990 I.. R5 2007 03 19 15 19 00 36.7100 126.1100 21.00 16.00 5.00 230679 TAP 2007 02 11 04 21 00 1999-99 G co CCGG 227.470 -999.990 ... R5 2007 03 20 11 15 00 36.7100 126.1100 21.00 16.00 5.00 230841 TAP 2007 02 11 04 21 00 2000-99 G co CCGG 226.870 -999.990 ... R5 2007 03 20 11 30 00 36.7100 126.1100 21.00 16.00 5.00 230842 TAP 2007 02 11 04 37 00 3717-99 G co CCGG 235.210 -999.990 ..C R5 2007 03 20 11 44 00 36.7100 126.1100 21.00 16.00 5.00 230843 TAP 2007 02 11 04 37 00 3718-99 G co CCGG 236.440 -999.990 ..C R5 2007 03 20 11 58 00 36.7100 126.1100 21.00 16.00 5.00 230844 TAP 2007 02 21 05 10 00 2533-99 G co CCGG 522.360 -999.990 .XC R5 2007 04 06 11 00 00 36.7100 126.1100 21.00 16.00 5.00 231645 TAP 2007 02 21 05 10 00 2534-99 G co CCGG 520.930 -999.990 .XC R5 2007 04 06 11 14 00 36.7100 126.1100 21.00 16.00 5.00 231646 TAP 2007 02 21 05 25 00 1285-99 G co CCGG 540.450 -999.990 .XC R5 2007 04 06 10 31 00 36.7100 126.1100 21.00 16.00 5.00 231643 TAP 2007 02 21 05 25 00 1286-99 G co CCGG 534.310 -999.990 .XC R5 2007 04 06 10 45 00 36.7100 126.1100 21.00 16.00 5.00 231644 TAP 2007 02 24 05 27 00 1645-99 G co CCGG 400.280 -999.990 ..C R5 2007 03 29 10 29 00 36.7100 126.1100 21.00 16.00 5.00 231353 TAP 2007 02 24 05 27 00 1646-99 G co CCGG 400.150 -999.990 ..C R5 2007 03 29 10 43 00 36.7100 126.1100 21.00 16.00 5.00 231354 TAP 2007 02 24 05 41 00 1147-99 G co CCGG 397.750 -999.990 ..C R5 2007 03 29 10 00 00 36.7100 126.1100 21.00 16.00 5.00 231355 TAP 2007 02 24 05 41 00 1148-99 G co CCGG 397.010 -999.990 ..C R5 2007 03 29 10 15 00 36.7100 126.1100 21.00 16.00 5.00 231356 TAP 2007 03 01 05 21 00 1713-99 G co CCGG 324.840 -999.990 ..C R5 2007 03 29 09 32 00 36.7100 126.1100 21.00 16.00 5.00 231351 TAP 2007 03 01 05 21 00 1714-99 G co CCGG 323.640 -999.990 ..C R5 2007 03 29 09 46 00 36.7100 126.1100 21.00 16.00 5.00 231352 TAP 2007 03 12 04 18 00 3173-99 G co CCGG 350.860 -999.990 ..C R5 2007 04 09 16 24 00 36.7100 126.1100 21.00 16.00 5.00 231827 TAP 2007 03 12 04 18 00 3174-99 G co CCGG 348.980 -999.990 ..C R5 2007 04 09 16 38 00 36.7100 126.1100 21.00 16.00 5.00 231828 TAP 2007 03 12 04 33 00 4409-99 G co CCGG 253.990 -999.990 P.C R5 2007 04 09 15 56 00 36.7100 126.1100 21.00 16.00 5.00 231829 TAP 2007 03 12 04 33 00 4410-99 G co CCGG 139.800 -999.990 P.. R5 2007 04 09 16 10 00 36.7100 126.1100 21.00 16.00 5.00 231830 TAP 2007 03 20 05 36 00 3725-99 G co CCGG 250.440 -999.990 ..C R5 2007 04 20 14 05 00 36.7100 126.1100 21.00 16.00 5.00 232563 TAP 2007 03 20 05 36 00 3726-99 G co CCGG 250.170 -999.990 ..C R5 2007 04 20 14 19 00 36.7100 126.1100 21.00 16.00 5.00 232564 TAP 2007 03 20 06 20 00 2375-99 G co CCGG 259.010 -999.990 ..C R5 2007 04 20 13 37 00 36.7100 126.1100 21.00 16.00 5.00 232565 TAP 2007 03 20 06 20 00 2376-99 G co CCGG 259.170 -999.990 ..C R5 2007 04 20 13 51 00 36.7100 126.1100 21.00 16.00 5.00 232566 TAP 2007 03 29 04 56 00 2053-99 G co CCGG 395.230 -999.990 ..C R5 2007 04 20 15 02 00 36.7100 126.1100 21.00 16.00 5.00 232567 TAP 2007 03 29 04 56 00 2054-99 G co CCGG 394.960 -999.990 ..C R5 2007 04 20 15 16 00 36.7100 126.1100 21.00 16.00 5.00 232568 TAP 2007 03 29 05 09 00 397-99 G co CCGG 403.950 -999.990 ..C R5 2007 04 20 14 34 00 36.7100 126.1100 21.00 16.00 5.00 232569 TAP 2007 03 29 05 09 00 398-99 G co CCGG 404.280 -999.990 ..C R5 2007 04 20 14 48 00 36.7100 126.1100 21.00 16.00 5.00 232570 TAP 2007 04 02 05 22 00 2065-99 G co CCGG 255.920 -999.990 ..C R5 2007 05 01 14 28 00 36.7100 126.1100 21.00 16.00 5.00 232947 TAP 2007 04 02 05 22 00 988-99 G co CCGG 257.040 -999.990 ..C R5 2007 05 01 14 14 00 36.7100 126.1100 21.00 16.00 5.00 232946 TAP 2007 04 02 05 35 00 2066-99 G co CCGG 264.630 -999.990 ..C R5 2007 05 01 14 56 00 36.7100 126.1100 21.00 16.00 5.00 232949 TAP 2007 04 02 05 35 00 987-99 G co CCGG 264.250 -999.990 ..C R5 2007 05 01 14 42 00 36.7100 126.1100 21.00 16.00 5.00 232948 TAP 2007 04 10 06 13 00 2281-99 G co CCGG 355.090 -999.990 ..C R5 2007 05 11 12 41 00 36.7100 126.1100 21.00 16.00 5.00 233799 TAP 2007 04 10 06 13 00 2282-99 G co CCGG 374.460 -999.990 ..C R5 2007 05 11 12 55 00 36.7100 126.1100 21.00 16.00 5.00 233800 TAP 2007 04 10 06 26 00 1051-99 G co CCGG 341.990 -999.990 ..C R5 2007 05 11 12 12 00 36.7100 126.1100 21.00 16.00 5.00 233797 TAP 2007 04 10 06 26 00 1052-99 G co CCGG 339.230 -999.990 ..C R5 2007 05 11 12 26 00 36.7100 126.1100 21.00 16.00 5.00 233798 TAP 2007 04 14 07 28 00 755-99 G co CCGG 328.120 -999.990 ..C R5 2007 05 10 10 13 00 36.7100 126.1100 21.00 16.00 5.00 233783 TAP 2007 04 14 07 28 00 756-99 G co CCGG 330.690 -999.990 ..C R5 2007 05 10 10 27 00 36.7100 126.1100 21.00 16.00 5.00 233784 TAP 2007 04 14 07 40 00 467-99 G co CCGG 341.330 -999.990 ..C R5 2007 05 10 10 42 00 36.7100 126.1100 21.00 16.00 5.00 233781 TAP 2007 04 14 07 40 00 468-99 G co CCGG 342.340 -999.990 ..C R5 2007 05 10 10 56 00 36.7100 126.1100 21.00 16.00 5.00 233782 TAP 2007 04 17 05 20 00 3447-99 G co CCGG 296.930 -999.990 ..C R5 2007 05 11 11 15 00 36.7100 126.1100 21.00 16.00 5.00 233795 TAP 2007 04 17 05 20 00 3448-99 G co CCGG 295.780 -999.990 ..C R5 2007 05 11 11 29 00 36.7100 126.1100 21.00 16.00 5.00 233796 TAP 2007 04 17 05 41 00 2083-99 G co CCGG 301.410 -999.990 ..C R5 2007 05 11 11 44 00 36.7100 126.1100 21.00 16.00 5.00 233793 TAP 2007 04 17 05 41 00 2084-99 G co CCGG 302.810 -999.990 ..C R5 2007 05 11 11 58 00 36.7100 126.1100 21.00 16.00 5.00 233794 TAP 2007 04 23 05 36 00 3643-99 G co CCGG 236.500 -999.990 ..C R5 2007 05 24 15 23 00 36.7100 126.1100 21.00 16.00 5.00 234627 TAP 2007 04 23 05 36 00 3644-99 G co CCGG 236.950 -999.990 ..C R5 2007 05 24 15 37 00 36.7100 126.1100 21.00 16.00 5.00 234628 TAP 2007 04 23 05 48 00 3721-99 G co CCGG 243.290 -999.990 ..C R5 2007 05 24 13 58 00 36.7100 126.1100 21.00 16.00 5.00 234629 TAP 2007 04 23 05 48 00 3722-99 G co CCGG 243.370 -999.990 ..C R5 2007 05 24 14 12 00 36.7100 126.1100 21.00 16.00 5.00 234630 TAP 2007 05 02 07 32 00 2763-99 G co CCGG 344.240 -999.990 ..C R5 2007 06 06 13 39 00 36.7100 126.1100 21.00 16.00 5.00 235423 TAP 2007 05 02 07 32 00 2764-99 G co CCGG 341.320 -999.990 ..C R5 2007 06 06 13 53 00 36.7100 126.1100 21.00 16.00 5.00 235424 TAP 2007 05 02 12 34 56 2777-99 G co CCGG 126.100 -999.990 P.. R5 2007 06 06 12 42 00 36.7100 126.1100 21.00 16.00 5.00 235425 TAP 2007 05 02 12 34 56 2778-99 G co CCGG 322.850 -999.990 P.C R5 2007 06 06 12 56 00 36.7100 126.1100 21.00 16.00 5.00 235426 TAP 2007 05 07 05 03 00 1173-99 G co CCGG 525.850 -999.990 .XC R5 2007 06 06 13 10 00 36.7100 126.1100 21.00 16.00 5.00 235419 TAP 2007 05 07 05 03 00 1174-99 G co CCGG 525.450 -999.990 .XC R5 2007 06 06 13 24 00 36.7100 126.1100 21.00 16.00 5.00 235420 TAP 2007 05 07 05 18 00 513-99 G co CCGG 513.570 -999.990 .XC R5 2007 06 06 15 36 00 36.7100 126.1100 21.00 16.00 5.00 235421 TAP 2007 05 07 05 18 00 514-99 G co CCGG 517.840 -999.990 .XC R5 2007 06 06 15 50 00 36.7100 126.1100 21.00 16.00 5.00 235422 TAP 2007 05 13 05 55 00 1764-99 G co CCGG 276.950 -999.990 ..C R5 2007 06 13 08 45 00 36.7100 126.1100 21.00 16.00 5.00 236017 TAP 2007 05 13 05 55 00 1973-99 G co CCGG 277.800 -999.990 ..C R5 2007 06 13 08 59 00 36.7100 126.1100 21.00 16.00 5.00 236018 TAP 2007 05 13 06 27 00 3481-99 G co CCGG 286.420 -999.990 ..C R5 2007 06 13 09 13 00 36.7100 126.1100 21.00 16.00 5.00 236019 TAP 2007 05 13 06 27 00 3482-99 G co CCGG 286.930 -999.990 ..C R5 2007 06 13 09 28 00 36.7100 126.1100 21.00 16.00 5.00 236020 TAP 2007 05 20 05 06 00 2350-99 G co CCGG 389.500 -999.990 ..C R5 2007 06 19 13 46 00 36.7100 126.1100 21.00 16.00 5.00 235877 TAP 2007 05 20 05 06 00 274-99 G co CCGG 392.050 -999.990 ..C R5 2007 06 19 13 32 00 36.7100 126.1100 21.00 16.00 5.00 235878 TAP 2007 05 20 06 29 00 3421-99 G co CCGG 366.490 -999.990 ..C R5 2007 06 19 13 03 00 36.7100 126.1100 21.00 16.00 5.00 235875 TAP 2007 05 20 06 29 00 3422-99 G co CCGG 367.590 -999.990 ..C R5 2007 06 19 13 18 00 36.7100 126.1100 21.00 16.00 5.00 235876 TAP 2007 05 31 08 10 00 3121-99 G co CCGG 238.150 -999.990 ..C R5 2007 06 29 11 30 00 36.7100 126.1100 21.00 16.00 5.00 237127 TAP 2007 05 31 08 10 00 3122-99 G co CCGG 237.980 -999.990 ..C R5 2007 06 29 11 45 00 36.7100 126.1100 21.00 16.00 5.00 237128 TAP 2007 05 31 08 51 00 2753-99 G co CCGG 240.890 -999.990 ..C R5 2007 07 02 11 57 00 36.7100 126.1100 21.00 16.00 5.00 237135 TAP 2007 05 31 08 51 00 2754-99 G co CCGG 240.220 -999.990 ..C R5 2007 07 02 12 11 00 36.7100 126.1100 21.00 16.00 5.00 237136 TAP 2007 06 07 07 11 00 2341-99 G co CCGG 208.380 -999.990 P.. R5 2007 07 02 15 16 00 36.7100 126.1100 21.00 16.00 5.00 237167 TAP 2007 06 07 07 11 00 2342-99 G co CCGG 140.380 -999.990 P.. R5 2007 07 02 15 30 00 36.7100 126.1100 21.00 16.00 5.00 237168 TAP 2007 06 07 07 25 00 3225-99 G co CCGG 158.610 -999.990 P.. R5 2007 07 02 14 48 00 36.7100 126.1100 21.00 16.00 5.00 237165 TAP 2007 06 07 07 25 00 3226-99 G co CCGG 140.590 -999.990 P.. R5 2007 07 02 15 02 00 36.7100 126.1100 21.00 16.00 5.00 237166 TAP 2007 06 16 04 40 00 1345-99 G co CCGG 204.200 -999.990 ... R6 2007 07 06 13 18 00 36.7100 126.1100 21.00 16.00 5.00 237749 TAP 2007 06 16 04 40 00 1346-99 G co CCGG 205.150 -999.990 ... R6 2007 07 06 13 33 00 36.7100 126.1100 21.00 16.00 5.00 237750 TAP 2007 06 16 04 40 00 2643-99 G co CCGG 149.190 -999.990 P.. R6 2007 07 06 13 47 00 36.7100 126.1100 21.00 16.00 5.00 237747 TAP 2007 06 16 04 40 00 2644-99 G co CCGG 187.830 -999.990 P.. R6 2007 07 06 14 02 00 36.7100 126.1100 21.00 16.00 5.00 237748 TAP 2007 07 04 04 39 00 4197-99 G co CCGG 169.090 -999.990 ... R6 2007 07 30 13 34 00 36.7100 126.1100 21.00 16.00 5.00 238874 TAP 2007 07 04 04 39 00 4198-99 G co CCGG 169.390 -999.990 ... R6 2007 07 30 13 48 00 36.7100 126.1100 21.00 16.00 5.00 238875 TAP 2007 07 04 05 02 00 3885-99 G co CCGG 165.290 -999.990 ... R6 2007 07 30 13 05 00 36.7100 126.1100 21.00 16.00 5.00 238872 TAP 2007 07 04 05 02 00 3886-99 G co CCGG 167.980 -999.990 ... R6 2007 07 30 13 19 00 36.7100 126.1100 21.00 16.00 5.00 238873 TAP 2007 07 08 04 53 00 1020-99 G co CCGG 268.180 -999.990 ..C R5 2007 08 02 12 47 00 36.7100 126.1100 21.00 16.00 5.00 239437 TAP 2007 07 08 04 53 00 1866-99 G co CCGG 266.890 -999.990 ..C R5 2007 08 02 12 33 00 36.7100 126.1100 21.00 16.00 5.00 239436 TAP 2007 07 08 05 09 00 1218-99 G co CCGG 271.420 -999.990 ..C R5 2007 08 02 11 51 00 36.7100 126.1100 21.00 16.00 5.00 239435 TAP 2007 07 08 05 09 00 1997-99 G co CCGG 271.410 -999.990 ..C R5 2007 08 02 11 36 00 36.7100 126.1100 21.00 16.00 5.00 239434 TAP 2007 07 15 06 15 00 2125-99 G co CCGG 160.050 -999.990 ... R5 2007 08 08 10 40 00 36.7100 126.1100 21.00 16.00 5.00 239642 TAP 2007 07 15 06 15 00 3164-99 G co CCGG 157.400 -999.990 ... R5 2007 08 08 10 25 00 36.7100 126.1100 21.00 16.00 5.00 239641 TAP 2007 07 15 06 20 00 2126-99 G co CCGG 135.200 -999.990 ... R5 2007 08 08 10 11 00 36.7100 126.1100 21.00 16.00 5.00 239643 TAP 2007 07 15 06 20 00 3163-99 G co CCGG 141.220 -999.990 ... R5 2007 08 08 09 57 00 36.7100 126.1100 21.00 16.00 5.00 239644 TAP 2007 07 21 07 40 00 901-99 G co CCGG 294.490 -999.990 .XC R5 2007 08 06 14 16 00 36.7100 126.1100 21.00 16.00 5.00 239565 TAP 2007 07 21 07 40 00 902-99 G co CCGG 301.440 -999.990 .XC R5 2007 08 06 14 30 00 36.7100 126.1100 21.00 16.00 5.00 239566 TAP 2007 07 21 07 55 00 4165-99 G co CCGG 254.940 -999.990 ..C R5 2007 08 06 12 51 00 36.7100 126.1100 21.00 16.00 5.00 239567 TAP 2007 07 21 07 55 00 4166-99 G co CCGG 251.960 -999.990 ..C R5 2007 08 06 13 05 00 36.7100 126.1100 21.00 16.00 5.00 239568 TAP 2007 07 26 07 29 00 165-99 G co CCGG 204.590 -999.990 ... R5 2007 08 29 16 24 00 36.7100 126.1100 21.00 16.00 5.00 240659 TAP 2007 07 26 07 29 00 166-99 G co CCGG 202.270 -999.990 ... R5 2007 08 29 16 38 00 36.7100 126.1100 21.00 16.00 5.00 240660 TAP 2007 07 26 07 39 00 1599-99 G co CCGG 226.870 -999.990 ... R5 2007 08 29 16 52 00 36.7100 126.1100 21.00 16.00 5.00 240661 TAP 2007 07 26 07 39 00 1600-99 G co CCGG 229.190 -999.990 ... R5 2007 08 29 17 06 00 36.7100 126.1100 21.00 16.00 5.00 240662 TAP 2007 08 02 05 50 00 2681-99 G co CCGG 137.530 -999.990 ... R5 2007 09 05 11 35 00 36.7100 126.1100 21.00 16.00 5.00 240867 TAP 2007 08 02 05 50 00 2682-99 G co CCGG 137.030 -999.990 ... R5 2007 09 05 11 49 00 36.7100 126.1100 21.00 16.00 5.00 240868 TAP 2007 08 02 06 03 00 4697-99 G co CCGG 202.110 -999.990 ... R5 2007 09 05 12 04 00 36.7100 126.1100 21.00 16.00 5.00 240869 TAP 2007 08 02 06 03 00 4698-99 G co CCGG 209.870 -999.990 ... R5 2007 09 05 12 18 00 36.7100 126.1100 21.00 16.00 5.00 240870 TAP 2007 08 09 05 12 00 4851-99 G co CCGG 67.630 -999.990 ... R5 2007 09 11 12 09 00 36.7100 126.1100 21.00 16.00 5.00 241227 TAP 2007 08 09 05 12 00 4852-99 G co CCGG 67.650 -999.990 ... R5 2007 09 11 12 23 00 36.7100 126.1100 21.00 16.00 5.00 241228 TAP 2007 08 09 05 24 00 4043-99 G co CCGG 69.620 -999.990 ... R5 2007 09 11 11 12 00 36.7100 126.1100 21.00 16.00 5.00 241223 TAP 2007 08 09 05 24 00 4044-99 G co CCGG 68.860 -999.990 ... R5 2007 09 11 11 26 00 36.7100 126.1100 21.00 16.00 5.00 241224 TAP 2007 08 17 05 48 00 3321-99 G co CCGG 69.700 -999.990 ... R5 2007 09 17 17 05 00 36.7100 126.1100 21.00 16.00 5.00 241560 TAP 2007 08 17 05 48 00 3322-99 G co CCGG 69.960 -999.990 ... R5 2007 09 17 17 19 00 36.7100 126.1100 21.00 16.00 5.00 241561 TAP 2007 08 17 06 02 00 3553-99 G co CCGG 72.780 -999.990 ... R5 2007 09 17 16 36 00 36.7100 126.1100 21.00 16.00 5.00 241562 TAP 2007 08 17 06 02 00 3554-99 G co CCGG 73.330 -999.990 ... R5 2007 09 17 16 50 00 36.7100 126.1100 21.00 16.00 5.00 241563 TAP 2007 08 26 06 20 00 1071-99 G co CCGG 138.910 -999.990 ... R5 2007 09 10 16 34 00 36.7100 126.1100 21.00 16.00 5.00 241221 TAP 2007 08 26 06 20 00 1072-99 G co CCGG 127.990 -999.990 ... R5 2007 09 10 16 49 00 36.7100 126.1100 21.00 16.00 5.00 241222 TAP 2007 08 26 06 32 00 4493-99 G co CCGG 80.020 -999.990 ... R5 2007 09 11 11 40 00 36.7100 126.1100 21.00 16.00 5.00 241225 TAP 2007 08 26 06 32 00 4494-99 G co CCGG 80.730 -999.990 ... R5 2007 09 11 11 55 00 36.7100 126.1100 21.00 16.00 5.00 241226 TAP 2007 09 09 06 00 00 1087-99 G co CCGG 439.350 -999.990 .XC R5 2007 10 16 13 34 00 36.7100 126.1100 21.00 16.00 5.00 243321 TAP 2007 09 09 06 00 00 1088-99 G co CCGG 439.880 -999.990 .XC R5 2007 10 16 13 48 00 36.7100 126.1100 21.00 16.00 5.00 243322 TAP 2007 09 09 06 12 00 3211-99 G co CCGG 461.680 -999.990 .XC R6 2007 10 16 13 55 00 36.7100 126.1100 21.00 16.00 5.00 243323 TAP 2007 09 09 06 12 00 3212-99 G co CCGG 463.820 -999.990 .XC R6 2007 10 16 14 09 00 36.7100 126.1100 21.00 16.00 5.00 243324 TAP 2007 09 17 06 00 00 4705-99 G co CCGG 193.800 -999.990 ... R5 2007 10 16 12 37 00 36.7100 126.1100 21.00 16.00 5.00 243337 TAP 2007 09 17 06 00 00 4706-99 G co CCGG 194.730 -999.990 ... R5 2007 10 16 12 51 00 36.7100 126.1100 21.00 16.00 5.00 243338 TAP 2007 09 17 06 13 00 2747-99 G co CCGG 195.760 -999.990 ... R5 2007 10 16 12 08 00 36.7100 126.1100 21.00 16.00 5.00 243339 TAP 2007 09 17 06 13 00 2748-99 G co CCGG 194.420 -999.990 ... R5 2007 10 16 12 23 00 36.7100 126.1100 21.00 16.00 5.00 243340 TAP 2007 09 27 06 23 00 1464-99 G co CCGG 132.650 -999.990 ... R5 2007 10 16 17 22 00 36.7100 126.1100 21.00 16.00 5.00 243333 TAP 2007 09 27 06 23 00 2336-99 G co CCGG 132.550 -999.990 ... R5 2007 10 16 17 36 00 36.7100 126.1100 21.00 16.00 5.00 243334 TAP 2007 09 27 06 35 00 2876-99 G co CCGG 133.730 -999.990 ... R5 2007 10 16 17 07 00 36.7100 126.1100 21.00 16.00 5.00 243336 TAP 2007 09 27 06 35 00 2914-99 G co CCGG 133.090 -999.990 ... R5 2007 10 16 16 53 00 36.7100 126.1100 21.00 16.00 5.00 243335 TAP 2007 10 08 05 15 00 1435-99 G co CCGG 154.860 -999.990 ... R5 2007 11 06 11 20 00 36.7100 126.1100 21.00 16.00 5.00 244350 TAP 2007 10 08 05 15 00 637-99 G co CCGG 153.880 -999.990 ... R5 2007 11 06 11 06 00 36.7100 126.1100 21.00 16.00 5.00 244349 TAP 2007 10 08 05 29 00 1211-99 G co CCGG 155.480 -999.990 ... R5 2007 11 06 09 41 00 36.7100 126.1100 21.00 16.00 5.00 244351 TAP 2007 10 08 05 29 00 3863-99 G co CCGG 154.960 -999.990 ... R5 2007 11 06 09 55 00 36.7100 126.1100 21.00 16.00 5.00 244352 TAP 2007 10 17 05 25 00 3911-99 G co CCGG 166.720 -999.990 ... R5 2007 11 26 17 04 00 36.7100 126.1100 21.00 16.00 5.00 245217 TAP 2007 10 17 05 25 00 3912-99 G co CCGG 165.900 -999.990 ... R5 2007 11 26 17 18 00 36.7100 126.1100 21.00 16.00 5.00 245218 TAP 2007 10 17 05 45 00 1671-99 G co CCGG 167.410 -999.990 ... R5 2007 11 30 15 37 00 36.7100 126.1100 21.00 16.00 5.00 245219 TAP 2007 10 27 04 57 00 1217-99 G co CCGG 218.230 -999.990 ... R5 2007 11 26 16 21 00 36.7100 126.1100 21.00 16.00 5.00 245214 TAP 2007 10 27 04 57 00 4716-99 G co CCGG 219.000 -999.990 ... R5 2007 11 26 16 07 00 36.7100 126.1100 21.00 16.00 5.00 245213 TAP 2007 10 27 05 05 00 2116-99 G co CCGG 221.400 -999.990 ... R5 2007 11 26 16 35 00 36.7100 126.1100 21.00 16.00 5.00 245215 TAP 2007 10 27 05 05 00 746-99 G co CCGG 221.510 -999.990 ... R5 2007 11 26 16 49 00 36.7100 126.1100 21.00 16.00 5.00 245216 TAP 2007 11 02 05 40 00 2955-99 G co CCGG 240.920 -999.990 ..C R5 2007 12 14 12 48 00 36.7100 126.1100 21.00 16.00 5.00 246107 TAP 2007 11 02 05 40 00 2956-99 G co CCGG 240.830 -999.990 ..C R5 2007 12 14 13 02 00 36.7100 126.1100 21.00 16.00 5.00 246108 TAP 2007 11 02 06 20 00 4787-99 G co CCGG 245.120 -999.990 ..C R5 2007 12 14 13 45 00 36.7100 126.1100 21.00 16.00 5.00 246109 TAP 2007 11 02 06 20 00 4788-99 G co CCGG 243.570 -999.990 ..C R5 2007 12 14 13 59 00 36.7100 126.1100 21.00 16.00 5.00 246110 TAP 2007 11 10 07 37 00 1448-99 G co CCGG 213.100 -999.990 ... R5 2007 12 12 13 46 00 36.7100 126.1100 21.00 16.00 5.00 245972 TAP 2007 11 10 07 37 00 2761-99 G co CCGG 213.160 -999.990 ... R5 2007 12 12 14 00 00 36.7100 126.1100 21.00 16.00 5.00 245973 TAP 2007 11 10 07 49 00 1487-99 G co CCGG 186.590 -999.990 ... R5 2007 12 12 14 15 00 36.7100 126.1100 21.00 16.00 5.00 245970 TAP 2007 11 10 07 49 00 2268-99 G co CCGG 182.790 -999.990 ... R5 2007 12 12 14 29 00 36.7100 126.1100 21.00 16.00 5.00 245971 TAP 2007 11 19 06 57 00 2119-99 G co CCGG 178.460 -999.990 ... R5 2007 12 28 13 51 00 36.7100 126.1100 21.00 16.00 5.00 246894 TAP 2007 11 19 06 57 00 2120-99 G co CCGG 179.010 -999.990 ... R5 2007 12 28 14 05 00 36.7100 126.1100 21.00 16.00 5.00 246895 TAP 2007 11 19 07 09 00 773-99 G co CCGG 182.030 -999.990 ... R5 2007 12 28 14 20 00 36.7100 126.1100 21.00 16.00 5.00 246892 TAP 2007 11 19 07 09 00 774-99 G co CCGG 182.250 -999.990 ... R5 2007 12 28 14 34 00 36.7100 126.1100 21.00 16.00 5.00 246893 TAP 2007 11 27 05 42 00 4809-99 G co CCGG 174.220 -999.990 ... R5 2007 12 28 14 48 00 36.7200 126.1200 21.00 16.00 5.00 246896 TAP 2007 11 27 05 42 00 921-99 G co CCGG 174.070 -999.990 ... R5 2007 12 28 15 02 00 36.7200 126.1200 21.00 16.00 5.00 246897 TAP 2007 11 27 05 53 00 1975-99 G co CCGG 166.480 -999.990 ... R5 2007 12 28 15 31 00 36.7100 126.1100 21.00 16.00 5.00 246898 TAP 2007 11 27 05 53 00 4135-99 G co CCGG 166.600 -999.990 ... R5 2007 12 28 15 17 00 36.7100 126.1100 21.00 16.00 5.00 246899 TAP 2007 12 04 05 35 00 3509-99 G co CCGG 183.680 -999.990 ... R5 2008 01 29 16 45 00 36.7200 126.1200 21.00 16.00 5.00 248601 TAP 2007 12 04 05 35 00 3510-99 G co CCGG 183.440 -999.990 ... R5 2008 01 29 16 59 00 36.7200 126.1200 21.00 16.00 5.00 248602 TAP 2007 12 04 12 34 56 1117-99 G co CCGG 180.170 -999.990 ... R5 2008 01 29 17 13 00 36.7200 126.1200 21.00 16.00 5.00 248603 TAP 2007 12 04 12 34 56 1118-99 G co CCGG 180.580 -999.990 ... R5 2008 01 29 17 28 00 36.7200 126.1200 21.00 16.00 5.00 248604 TAP 2007 12 19 07 08 00 2460-99 G co CCGG 266.040 -999.990 ..C R5 2008 01 29 16 02 00 36.7200 126.1200 21.00 16.00 5.00 248598 TAP 2007 12 19 07 08 00 2882-99 G co CCGG 264.560 -999.990 ..C R5 2008 01 29 15 48 00 36.7200 126.1200 21.00 16.00 5.00 248597 TAP 2007 12 19 07 20 00 2515-99 G co CCGG 265.300 -999.990 ..C R5 2008 01 29 16 31 00 36.7200 126.1200 21.00 16.00 5.00 248600 TAP 2007 12 19 07 20 00 510-99 G co CCGG 264.780 -999.990 ..C R5 2008 01 29 16 16 00 36.7200 126.1200 21.00 16.00 5.00 248599 TAP 2008 01 01 05 45 00 2414-99 G co CCGG 187.930 -999.990 ... V2 2008 02 01 10 23 00 36.7200 126.1200 21.00 16.00 5.00 248726 TAP 2008 01 01 05 45 00 4150-99 G co CCGG 187.960 -999.990 ... V2 2008 02 01 10 38 00 36.7200 126.1200 21.00 16.00 5.00 248727 TAP 2008 01 01 06 00 00 4625-99 G co CCGG 187.450 -999.990 ... V2 2008 02 01 10 54 00 36.7200 126.1200 21.00 16.00 5.00 248728 TAP 2008 01 01 06 00 00 733-99 G co CCGG 187.410 -999.990 ... V2 2008 02 01 11 09 00 36.7200 126.1200 21.00 16.00 5.00 248729 TAP 2008 01 04 06 25 00 4911-99 G co CCGG 287.840 -999.990 ... V2 2008 02 05 16 38 00 36.7200 126.1200 21.00 16.00 5.00 248947 TAP 2008 01 04 06 25 00 4912-99 G co CCGG 287.260 -999.990 ... V2 2008 02 05 16 54 00 36.7200 126.1200 21.00 16.00 5.00 248948 TAP 2008 01 04 06 35 00 4909-99 G co CCGG 287.190 -999.990 ... V2 2008 02 05 16 08 00 36.7200 126.1200 21.00 16.00 5.00 248945 TAP 2008 01 04 06 35 00 4910-99 G co CCGG 286.980 -999.990 ... V2 2008 02 05 16 23 00 36.7200 126.1200 21.00 16.00 5.00 248946 TAP 2008 01 12 04 45 00 1366-99 G co CCGG 292.080 -999.990 ... V2 2008 02 21 14 16 00 36.7200 126.1200 21.00 16.00 5.00 249432 TAP 2008 01 12 04 45 00 74-99 G co CCGG 290.480 -999.990 ... V2 2008 02 21 14 00 00 36.7200 126.1200 21.00 16.00 5.00 249433 TAP 2008 01 12 05 00 00 4244-99 G co CCGG 299.310 -999.990 ... V2 2008 02 21 14 47 00 36.7200 126.1200 21.00 16.00 5.00 249431 TAP 2008 01 12 05 00 00 51-99 G co CCGG 299.070 -999.990 ... V2 2008 02 21 14 31 00 36.7200 126.1200 21.00 16.00 5.00 249430 TAP 2008 01 23 04 35 00 439-99 G co CCGG 232.870 -999.990 ... V2 2008 03 14 11 39 00 36.7200 126.1200 21.00 16.00 5.00 250908 TAP 2008 01 23 04 35 00 440-99 G co CCGG 234.450 -999.990 ... V2 2008 03 14 11 54 00 36.7200 126.1200 21.00 16.00 5.00 250909 TAP 2008 01 23 04 45 00 373-99 G co CCGG 237.960 -999.990 ... V2 2008 03 13 16 47 00 36.7200 126.1200 21.00 16.00 5.00 250890 TAP 2008 01 23 04 45 00 374-99 G co CCGG 239.060 -999.990 ... V2 2008 03 13 17 02 00 36.7200 126.1200 21.00 16.00 5.00 250891 TAP 2008 01 31 06 09 00 4901-99 G co CCGG 200.840 -999.990 ... V2 2008 03 18 13 00 00 36.7200 126.1200 21.00 16.00 5.00 251046 TAP 2008 01 31 06 09 00 4902-99 G co CCGG 202.500 -999.990 ... V2 2008 03 18 13 16 00 36.7200 126.1200 21.00 16.00 5.00 251047 TAP 2008 01 31 06 20 00 3919-99 G co CCGG 206.720 -999.990 ... V2 2008 03 18 12 29 00 36.7200 126.1200 21.00 16.00 5.00 251044 TAP 2008 01 31 06 20 00 3920-99 G co CCGG 205.480 -999.990 ... V2 2008 03 18 12 44 00 36.7200 126.1200 21.00 16.00 5.00 251045 TAP 2008 02 06 05 20 00 3670-99 G co CCGG 302.180 -999.990 ... V2 2008 03 18 11 28 00 36.7200 126.1200 21.00 16.00 5.00 251040 TAP 2008 02 06 05 20 00 4209-99 G co CCGG 300.920 -999.990 ... V2 2008 03 18 11 43 00 36.7200 126.1200 21.00 16.00 5.00 251041 TAP 2008 02 06 05 29 00 2053-99 G co CCGG 263.770 -999.990 P.. V2 2008 03 18 12 14 00 36.7200 126.1200 21.00 16.00 5.00 251043 TAP 2008 02 06 05 29 00 300-99 G co CCGG 292.900 -999.990 P.. V2 2008 03 18 11 58 00 36.7200 126.1200 21.00 16.00 5.00 251042 TAP 2008 02 17 07 22 00 4662-99 G co CCGG 239.780 -999.990 ... V2 2008 03 13 14 13 00 36.7200 126.1200 21.00 16.00 5.00 250828 TAP 2008 02 17 07 22 00 4674-99 G co CCGG 240.070 -999.990 ... V2 2008 03 13 14 28 00 36.7200 126.1200 21.00 16.00 5.00 250829 TAP 2008 02 17 07 45 00 183-99 G co CCGG 245.170 -999.990 ... V2 2008 03 13 13 42 00 36.7200 126.1200 21.00 16.00 5.00 250830 TAP 2008 02 17 07 45 00 4425-99 G co CCGG 245.490 -999.990 ... V2 2008 03 13 13 57 00 36.7200 126.1200 21.00 16.00 5.00 250831 TAP 2008 02 23 03 27 00 1816-99 G co CCGG 238.310 -999.990 ..C R5 2008 03 27 15 00 00 36.7200 126.1200 21.00 16.00 5.00 251523 TAP 2008 02 23 03 27 00 4616-99 G co CCGG 237.620 -999.990 ..C R5 2008 03 27 15 14 00 36.7200 126.1200 21.00 16.00 5.00 251524 TAP 2008 02 23 03 39 00 4112-99 G co CCGG 238.160 -999.990 ..C R5 2008 03 27 14 17 00 36.7200 126.1200 21.00 16.00 5.00 251526 TAP 2008 02 23 03 39 00 719-99 G co CCGG 238.120 -999.990 ..C R5 2008 03 27 14 32 00 36.7200 126.1200 21.00 16.00 5.00 251525 TAP 2008 02 27 05 31 00 3370-99 G co CCGG 258.980 -999.990 ..C R5 2008 03 27 13 06 00 36.7200 126.1200 21.00 16.00 5.00 251519 TAP 2008 02 27 05 31 00 3706-99 G co CCGG 259.280 -999.990 ..C R5 2008 03 27 13 21 00 36.7200 126.1200 21.00 16.00 5.00 251520 TAP 2008 02 27 05 43 00 1028-99 G co CCGG 256.320 -999.990 ..C R5 2008 03 27 13 35 00 36.7200 126.1200 21.00 16.00 5.00 251521 TAP 2008 02 27 05 43 00 4285-99 G co CCGG 256.000 -999.990 ..C R5 2008 03 27 13 49 00 36.7200 126.1200 21.00 16.00 5.00 251522 TAP 2008 03 03 05 15 00 1239-99 G co CCGG 255.570 -999.990 ..C R5 2008 03 27 14 03 00 36.7200 126.1200 21.00 16.00 5.00 251527 TAP 2008 03 03 05 15 00 3319-99 G co CCGG 254.010 -999.990 ..C R5 2008 03 27 14 46 00 36.7200 126.1200 21.00 16.00 5.00 251528 TAP 2008 03 03 05 27 00 3785-99 G co CCGG 254.320 -999.990 ..C R5 2008 03 31 10 40 00 36.7200 126.1200 21.00 16.00 5.00 251529 TAP 2008 03 24 06 00 00 1129-99 G co CCGG 545.040 -999.990 .XC R5 2008 04 18 09 51 00 36.7200 126.1200 21.00 16.00 5.00 252706 TAP 2008 03 24 06 00 00 2293-99 G co CCGG 544.860 -999.990 .XC R5 2008 04 18 10 05 00 36.7200 126.1200 21.00 16.00 5.00 252707 TAP 2008 03 24 06 12 00 1777-99 G co CCGG 545.440 -999.990 .XC R5 2008 04 18 09 37 00 36.7200 126.1200 21.00 16.00 5.00 252709 TAP 2008 03 24 06 12 00 413-99 G co CCGG 547.750 -999.990 .XC R5 2008 04 18 09 22 00 36.7200 126.1200 21.00 16.00 5.00 252708 TAP 2008 03 26 05 27 00 1893-99 G co CCGG 365.990 -999.990 ... V2 2008 04 18 10 14 00 36.7200 126.1200 21.00 16.00 5.00 252711 TAP 2008 03 26 05 38 00 3392-99 G co CCGG 385.260 -999.990 ... V2 2008 04 18 10 29 00 36.7200 126.1200 21.00 16.00 5.00 252710 TAP 2008 03 31 05 14 00 2943-99 G co CCGG 485.620 -999.990 .XC R5 2008 05 07 10 25 00 36.7300 126.1300 21.00 16.00 5.00 253727 TAP 2008 03 31 05 14 00 4613-99 G co CCGG 486.190 -999.990 .XC R5 2008 05 07 10 39 00 36.7300 126.1300 21.00 16.00 5.00 253728 TAP 2008 03 31 05 19 00 1227-99 G co CCGG 481.360 -999.990 .XC R5 2008 05 07 10 54 00 36.7300 126.1300 21.00 16.00 5.00 253729 TAP 2008 03 31 05 19 00 4785-99 G co CCGG 482.250 -999.990 .XC R5 2008 05 07 11 08 00 36.7300 126.1300 21.00 16.00 5.00 253730 TAP 2008 04 08 05 25 00 1458-99 G co CCGG 362.100 -999.990 ... V2 2008 05 06 16 04 00 36.7300 126.1300 21.00 16.00 5.00 253723 TAP 2008 04 08 05 25 00 4166-99 G co CCGG 368.700 -999.990 ... V2 2008 05 06 16 19 00 36.7300 126.1300 21.00 16.00 5.00 253724 TAP 2008 04 08 12 34 56 4700-99 G co CCGG 402.440 -999.990 ... V2 2008 05 06 16 35 00 36.7300 126.1300 21.00 16.00 5.00 253725 TAP 2008 04 08 12 34 56 4848-99 G co CCGG 401.830 -999.990 ... V2 2008 05 06 16 50 00 36.7300 126.1300 21.00 16.00 5.00 253726 TAP 2008 04 14 06 28 00 2336-99 G co CCGG 355.530 -999.990 ..C R5 2008 05 07 12 19 00 36.7300 126.1300 21.00 16.00 5.00 253908 TAP 2008 04 14 06 28 00 3035-99 G co CCGG 357.090 -999.990 ..C R5 2008 05 07 12 33 00 36.7300 126.1300 21.00 16.00 5.00 253909 TAP 2008 04 14 06 40 00 2450-99 G co CCGG 400.690 -999.990 ..C R5 2008 05 07 12 05 00 36.7300 126.1300 21.00 16.00 5.00 253906 TAP 2008 04 14 06 40 00 807-99 G co CCGG 403.010 -999.990 ..C R5 2008 05 07 11 51 00 36.7300 126.1300 21.00 16.00 5.00 253907 TAP 2008 04 18 05 51 00 3705-99 G co CCGG 245.650 -999.990 ... V2 2008 05 19 12 11 00 36.7300 126.1300 21.00 16.00 5.00 254497 TAP 2008 04 18 05 51 00 4367-99 G co CCGG 244.060 -999.990 ... V2 2008 05 19 12 26 00 36.7300 126.1300 21.00 16.00 5.00 254498 TAP 2008 04 18 06 03 00 1250-99 G co CCGG 238.420 -999.990 ... V2 2008 05 19 12 42 00 36.7300 126.1300 21.00 16.00 5.00 254501 TAP 2008 04 18 06 03 00 2473-99 G co CCGG 234.730 -999.990 ... V2 2008 05 19 12 57 00 36.7300 126.1300 21.00 16.00 5.00 254502 TAP 2008 04 23 05 34 00 3348-99 G co CCGG 261.430 -999.990 ... V2 2008 05 19 11 40 00 36.7300 126.1300 21.00 16.00 5.00 254499 TAP 2008 04 23 05 34 00 4116-99 G co CCGG 261.460 -999.990 ... V2 2008 05 19 11 55 00 36.7300 126.1300 21.00 16.00 5.00 254500 TAP 2008 04 23 05 47 00 3978-99 G co CCGG 264.040 -999.990 ... V2 2008 05 19 14 14 00 36.7300 126.1300 21.00 16.00 5.00 254503 TAP 2008 04 23 05 47 00 4891-99 G co CCGG 263.390 -999.990 ... V2 2008 05 19 14 29 00 36.7300 126.1300 21.00 16.00 5.00 254504 TAP 2008 05 05 05 55 00 3515-99 G co CCGG 461.490 -999.990 .XC R5 2008 06 10 15 32 00 36.7300 126.1300 21.00 16.00 5.00 255356 TAP 2008 05 05 05 55 00 3516-99 G co CCGG 460.290 -999.990 .XC R5 2008 06 10 15 46 00 36.7300 126.1300 21.00 16.00 5.00 255357 TAP 2008 05 05 06 07 00 881-99 G co CCGG 458.680 -999.990 .XC R5 2008 06 10 16 00 00 36.7300 126.1300 21.00 16.00 5.00 255354 TAP 2008 05 05 06 07 00 882-99 G co CCGG 459.550 -999.990 .XC R5 2008 06 10 16 14 00 36.7300 126.1300 21.00 16.00 5.00 255355 TAP 2008 05 14 05 51 00 3319-99 G co CCGG 179.030 -999.990 ... V2 2008 06 05 10 09 00 36.7300 126.1300 21.00 16.00 5.00 255271 TAP 2008 05 14 05 51 00 743-99 G co CCGG 190.130 -999.990 ... V2 2008 06 05 09 53 00 36.7300 126.1300 21.00 16.00 5.00 255270 TAP 2008 05 14 06 03 00 2414-99 G co CCGG 178.180 -999.990 ... V2 2008 06 05 10 24 00 36.7300 126.1300 21.00 16.00 5.00 255272 TAP 2008 05 14 06 03 00 3785-99 G co CCGG 178.380 -999.990 ... V2 2008 06 05 10 39 00 36.7300 126.1300 21.00 16.00 5.00 255273 TAP 2008 05 20 06 53 00 4238-99 G co CCGG 266.260 -999.990 ..C R5 2008 06 10 16 58 00 36.7300 126.1300 21.00 16.00 5.00 255350 TAP 2008 05 20 06 53 00 4402-99 G co CCGG 266.640 -999.990 ..C R5 2008 06 10 17 12 00 36.7300 126.1300 21.00 16.00 5.00 255351 TAP 2008 05 20 07 05 00 1239-99 G co CCGG 268.430 -999.990 ..C R5 2008 06 10 16 43 00 36.7300 126.1300 21.00 16.00 5.00 255353 TAP 2008 05 20 07 05 00 687-99 G co CCGG 267.830 -999.990 ..C R5 2008 06 10 16 29 00 36.7300 126.1300 21.00 16.00 5.00 255352 TAP 2008 05 29 06 47 00 2789-99 G co CCGG 409.820 -999.990 .X. V2 2008 07 15 11 36 00 36.7300 126.1300 21.00 16.00 5.00 257257 TAP 2008 05 29 06 47 00 968-99 G co CCGG 407.240 -999.990 .X. V2 2008 07 15 11 21 00 36.7300 126.1300 21.00 16.00 5.00 257256 TAP 2008 05 29 06 59 00 3075-99 G co CCGG 415.910 -999.990 .X. V2 2008 07 15 10 50 00 36.7300 126.1300 21.00 16.00 5.00 257258 TAP 2008 05 29 06 59 00 3108-99 G co CCGG 415.510 -999.990 .X. V2 2008 07 15 11 06 00 36.7300 126.1300 21.00 16.00 5.00 257259 TAP 2008 06 07 07 00 00 2163-99 G co CCGG 268.410 -999.990 P.C R5 2008 07 15 11 31 00 36.7300 126.1300 21.00 16.00 5.00 257261 TAP 2008 06 07 07 00 00 610-99 G co CCGG 261.060 -999.990 P.C R5 2008 07 15 11 17 00 36.7300 126.1300 21.00 16.00 5.00 257260 TAP 2008 06 07 07 11 00 4285-99 G co CCGG 591.690 -999.990 P.. V2 2008 07 15 12 07 00 36.7300 126.1300 21.00 16.00 5.00 257263 TAP 2008 06 07 07 11 00 967-99 G co CCGG 935.910 -999.990 P.. V2 2008 07 15 11 52 00 36.7300 126.1300 21.00 16.00 5.00 257262 TAP 2008 06 23 07 24 00 2463-99 G co CCGG 214.030 -999.990 P.. R5 2008 07 30 11 44 00 36.7300 126.1300 21.00 16.00 5.00 258123 TAP 2008 06 23 07 24 00 2474-99 G co CCGG 202.620 -999.990 P.. R5 2008 07 30 11 58 00 36.7300 126.1300 21.00 16.00 5.00 258124 TAP 2008 06 23 07 37 00 1211-99 G co CCGG 196.460 -999.990 ... V2 2008 07 30 12 00 00 36.7300 126.1300 21.00 16.00 5.00 258122 TAP 2008 06 23 07 37 00 287-99 G co CCGG 196.030 -999.990 ... V2 2008 07 30 11 44 00 36.7300 126.1300 21.00 16.00 5.00 258121 TAP 2008 07 07 07 20 00 3628-99 G co CCGG 78.130 -999.990 ... V2 2008 07 30 11 29 00 36.7300 126.1300 21.00 16.00 5.00 258120 TAP 2008 07 07 07 20 00 789-99 G co CCGG 78.210 -999.990 ... V2 2008 07 30 11 14 00 36.7300 126.1300 21.00 16.00 5.00 258119 TAP 2008 07 07 07 24 00 4005-99 G co CCGG 77.830 -999.990 ... V2 2008 07 30 10 58 00 36.7300 126.1300 21.00 16.00 5.00 258126 TAP 2008 07 07 07 24 00 431-99 G co CCGG 77.980 -999.990 ... V2 2008 07 30 10 43 00 36.7300 126.1300 21.00 16.00 5.00 258125 TAP 2008 07 10 07 21 00 3155-99 G co CCGG 85.330 -999.990 ... V2 2008 09 18 12 57 00 36.7300 126.1300 21.00 16.00 5.00 261077 TAP 2008 07 10 07 21 00 3374-99 G co CCGG 85.100 -999.990 ... V2 2008 09 18 13 13 00 36.7300 126.1300 21.00 16.00 5.00 261078 TAP 2008 07 10 07 33 00 2459-99 G co CCGG 85.110 -999.990 ... V2 2008 09 18 12 26 00 36.7300 126.1300 21.00 16.00 5.00 261079 TAP 2008 07 10 07 33 00 3385-99 G co CCGG 85.060 -999.990 ... V2 2008 09 18 12 42 00 36.7300 126.1300 21.00 16.00 5.00 261080 TAP 2008 07 22 06 06 00 1677-99 G co CCGG 188.000 -999.990 ... V2 2008 08 29 13 46 00 36.7300 126.1300 21.00 16.00 5.00 259667 TAP 2008 07 22 06 06 00 1678-99 G co CCGG 188.590 -999.990 ... V2 2008 08 29 14 02 00 36.7300 126.1300 21.00 16.00 5.00 259668 TAP 2008 07 22 06 17 00 2917-99 G co CCGG 189.910 -999.990 P.. V2 2008 08 29 13 15 00 36.7300 126.1300 21.00 16.00 5.00 259669 TAP 2008 07 22 06 17 00 2918-99 G co CCGG 193.100 -999.990 P.. V2 2008 08 29 13 31 00 36.7300 126.1300 21.00 16.00 5.00 259670 TAP 2008 07 28 05 08 00 1398-99 G co CCGG 344.930 -999.990 .X. V2 2008 08 29 14 17 00 36.7300 126.1300 21.00 16.00 5.00 259673 TAP 2008 07 28 05 08 00 3390-99 G co CCGG 345.240 -999.990 .X. V2 2008 08 29 14 32 00 36.7300 126.1300 21.00 16.00 5.00 259674 TAP 2008 07 28 05 21 00 723-99 G co CCGG 333.550 -999.990 .X. V2 2008 08 29 14 48 00 36.7300 126.1300 21.00 16.00 5.00 259671 TAP 2008 07 28 05 21 00 724-99 G co CCGG 334.200 -999.990 .X. V2 2008 08 29 15 03 00 36.7300 126.1300 21.00 16.00 5.00 259672 TAP 2008 08 03 05 05 00 1247-99 G co CCGG 488.490 -999.990 P.. V2 2008 09 19 13 49 00 36.7300 126.1300 21.00 16.00 5.00 261099 TAP 2008 08 03 05 05 00 3967-99 G co CCGG 483.450 -999.990 P.. V2 2008 09 19 14 05 00 36.7300 126.1300 21.00 16.00 5.00 261100 TAP 2008 08 03 06 52 00 1017-99 G co CCGG 518.890 -999.990 .X. V2 2008 09 19 13 34 00 36.7300 126.1300 21.00 16.00 5.00 261102 TAP 2008 08 03 06 52 00 658-99 G co CCGG 521.760 -999.990 .X. V2 2008 09 19 13 19 00 36.7300 126.1300 21.00 16.00 5.00 261101 TAP 2008 08 11 04 53 00 4725-99 G co CCGG 178.680 -999.990 ... V2 2008 09 18 12 11 00 36.7300 126.1300 21.00 16.00 5.00 261076 TAP 2008 08 11 04 53 00 925-99 G co CCGG 179.580 -999.990 ... V2 2008 09 18 11 56 00 36.7300 126.1300 21.00 16.00 5.00 261075 TAP 2008 08 11 05 05 00 1249-99 G co CCGG 183.570 -999.990 ... V2 2008 09 18 11 25 00 36.7300 126.1300 21.00 16.00 5.00 261073 TAP 2008 08 11 05 05 00 3710-99 G co CCGG 183.360 -999.990 ... V2 2008 09 18 11 40 00 36.7300 126.1300 21.00 16.00 5.00 261074 TAP 2008 09 02 04 54 00 4027-99 G co CCGG 132.430 -999.990 ... V2 2008 10 21 13 32 00 36.7300 126.1300 21.00 16.00 5.00 262484 TAP 2008 09 02 04 54 00 4231-99 G co CCGG 132.430 -999.990 ... V2 2008 10 21 13 47 00 36.7300 126.1300 21.00 16.00 5.00 262485 TAP 2008 09 02 05 06 00 148-99 G co CCGG 133.520 -999.990 ... V2 2008 10 21 13 01 00 36.7300 126.1300 21.00 16.00 5.00 262486 TAP 2008 09 02 05 06 00 161-99 G co CCGG 131.730 -999.990 ... V2 2008 10 21 13 17 00 36.7300 126.1300 21.00 16.00 5.00 262487 TAP 2008 09 10 05 50 00 4684-99 G co CCGG 278.040 -999.990 ... V2 2008 10 10 12 49 00 36.7300 126.1300 21.00 16.00 5.00 262248 TAP 2008 09 10 05 50 00 593-99 G co CCGG 278.530 -999.990 ... V2 2008 10 10 12 33 00 36.7300 126.1300 21.00 16.00 5.00 262247 TAP 2008 09 10 06 03 00 2952-99 G co CCGG 290.580 -999.990 P.. V2 2008 10 13 10 54 00 36.7300 126.1300 21.00 16.00 5.00 262249 TAP 2008 09 10 06 03 00 5061-99 G co CCGG 280.780 -999.990 P.. V2 2008 10 13 11 10 00 36.7300 126.1300 21.00 16.00 5.00 262250 TAP 2008 09 18 05 17 00 2921-99 G co CCGG 345.150 -999.990 P.. V2 2008 10 13 10 23 00 36.7300 126.1300 21.00 16.00 5.00 262251 TAP 2008 09 18 05 17 00 953-99 G co CCGG 342.070 -999.990 P.. V2 2008 10 13 10 39 00 36.7300 126.1300 21.00 16.00 5.00 262252 TAP 2008 09 18 05 29 00 1780-99 G co CCGG 341.390 -999.990 ... V2 2008 10 13 11 25 00 36.7300 126.1300 21.00 16.00 5.00 262253 TAP 2008 09 18 05 29 00 4553-99 G co CCGG 339.500 -999.990 ... V2 2008 10 13 11 40 00 36.7300 126.1300 21.00 16.00 5.00 262254 TAP 2008 10 08 06 44 00 1030-99 G co CCGG 291.910 -999.990 ... V2 2008 11 11 12 41 00 36.7300 126.1300 21.00 16.00 5.00 263779 TAP 2008 10 08 06 44 00 4655-99 G co CCGG 291.420 -999.990 ... V2 2008 11 11 12 57 00 36.7300 126.1300 21.00 16.00 5.00 263780 TAP 2008 10 08 06 57 00 3567-99 G co CCGG 290.920 -999.990 ... V2 2008 11 11 12 26 00 36.7300 126.1300 21.00 16.00 5.00 263782 TAP 2008 10 08 06 57 00 897-99 G co CCGG 291.280 -999.990 ... V2 2008 11 11 12 10 00 36.7300 126.1300 21.00 16.00 5.00 263781 TAP 2008 10 11 07 03 00 1024-99 G co CCGG 149.870 -999.990 ... V2 2008 11 17 14 58 00 36.7300 126.1300 21.00 16.00 5.00 263955 TAP 2008 10 11 07 03 00 3107-99 G co CCGG 149.740 -999.990 ... V2 2008 11 17 15 13 00 36.7300 126.1300 21.00 16.00 5.00 263956 TAP 2008 10 11 07 15 00 1533-99 G co CCGG 150.900 -999.990 ... V2 2008 11 24 11 27 00 36.7300 126.1300 21.00 16.00 5.00 263957 TAP 2008 10 11 07 15 00 1592-99 G co CCGG 150.960 -999.990 ... V2 2008 11 24 11 42 00 36.7300 126.1300 21.00 16.00 5.00 263958 TAP 2008 10 27 05 50 00 3347-99 G co CCGG 186.190 -999.990 ... R5 2008 12 11 14 01 00 36.7300 126.1300 21.00 16.00 5.00 265184 TAP 2008 10 27 05 50 00 376-99 G co CCGG 186.450 -999.990 ... R5 2008 12 11 13 46 00 36.7300 126.1300 21.00 16.00 5.00 265183 TAP 2008 10 27 06 03 00 4243-99 G co CCGG 194.810 -999.990 ... R5 2008 12 11 13 32 00 36.7300 126.1300 21.00 16.00 5.00 265185 TAP 2008 10 27 06 03 00 96-99 G co CCGG 197.520 -999.990 ... R5 2008 12 11 13 18 00 36.7300 126.1300 21.00 16.00 5.00 265186 TAP 2008 11 04 06 28 00 150-99 G co CCGG 153.430 -999.990 ... V2 2008 12 11 11 09 00 36.7300 126.1300 21.00 16.00 5.00 265181 TAP 2008 11 04 06 28 00 2876-99 G co CCGG 153.270 -999.990 ... V2 2008 12 11 11 24 00 36.7300 126.1300 21.00 16.00 5.00 265182 TAP 2008 11 04 06 39 00 2666-99 G co CCGG 150.680 -999.990 ... R5 2008 12 11 12 49 00 36.7300 126.1300 21.00 16.00 5.00 265179 TAP 2008 11 04 06 39 00 4338-99 G co CCGG 150.440 -999.990 ... R5 2008 12 11 13 04 00 36.7300 126.1300 21.00 16.00 5.00 265180 TAP 2008 11 22 07 00 00 3506-99 G co CCGG 149.320 -999.990 ... R5 2009 01 15 10 55 00 36.7300 126.1300 21.00 16.00 5.00 267543 TAP 2008 11 22 07 00 00 4525-99 G co CCGG 150.440 -999.990 ... R5 2009 01 15 11 09 00 36.7300 126.1300 21.00 16.00 5.00 267544 TAP 2008 11 22 07 12 00 1130-99 G co CCGG 150.820 -999.990 ... R5 2009 01 15 10 12 00 36.7300 126.1300 21.00 16.00 5.00 267545 TAP 2008 11 22 07 12 00 955-99 G co CCGG 150.080 -999.990 ... R5 2009 01 15 09 58 00 36.7300 126.1300 21.00 16.00 5.00 267546 TAP 2008 12 06 08 19 00 2551-99 G co CCGG 160.410 -999.990 ... R5 2009 01 14 15 33 00 36.7300 126.1300 21.00 16.00 5.00 267537 TAP 2008 12 06 08 19 00 2552-99 G co CCGG 161.340 -999.990 ... R5 2009 01 14 15 48 00 36.7300 126.1300 21.00 16.00 5.00 267538 TAP 2008 12 14 05 37 00 2464-99 G co CCGG 195.540 -999.990 ... R5 2009 01 15 10 27 00 36.7300 126.1300 21.00 16.00 5.00 267539 TAP 2008 12 14 05 37 00 2530-99 G co CCGG 194.940 -999.990 ... R5 2009 01 15 10 41 00 36.7300 126.1300 21.00 16.00 5.00 267540 TAP 2008 12 14 05 50 00 3845-99 G co CCGG 197.340 -999.990 ... R5 2009 01 14 16 30 00 36.7300 126.1300 21.00 16.00 5.00 267541 TAP 2008 12 14 05 50 00 4165-99 G co CCGG 197.780 -999.990 ... R5 2009 01 14 16 45 00 36.7300 126.1300 21.00 16.00 5.00 267542 TAP 2008 12 18 08 07 00 1469-99 G co CCGG 161.210 -999.990 ... R5 2009 01 14 16 02 00 36.7300 126.1300 21.00 16.00 5.00 267535 TAP 2008 12 18 08 07 00 1470-99 G co CCGG 161.550 -999.990 ... R5 2009 01 14 16 16 00 36.7300 126.1300 21.00 16.00 5.00 267536 TAP 2008 12 22 06 32 00 1246-99 G co CCGG 165.360 -999.990 ... R5 2009 02 05 13 00 00 36.7300 126.1300 21.00 16.00 5.00 268766 TAP 2008 12 22 06 32 00 3495-99 G co CCGG 166.470 -999.990 ... R5 2009 02 05 13 14 00 36.7300 126.1300 21.00 16.00 5.00 268767 TAP 2008 12 22 06 45 00 2566-99 G co CCGG 158.340 -999.990 ... R5 2009 02 05 12 31 00 36.7300 126.1300 21.00 16.00 5.00 268768 TAP 2008 12 22 06 45 00 4250-99 G co CCGG 157.650 -999.990 ... R5 2009 02 05 12 45 00 36.7300 126.1300 21.00 16.00 5.00 268769 TAP 2008 12 30 05 01 00 4103-99 G co CCGG 206.780 -999.990 ... R5 2009 02 05 11 48 00 36.7300 126.1300 21.00 16.00 5.00 268763 TAP 2008 12 30 05 01 00 824-99 G co CCGG 204.920 -999.990 ... R5 2009 02 05 11 34 00 36.7300 126.1300 21.00 16.00 5.00 268762 TAP 2008 12 30 05 13 00 2991-99 G co CCGG 191.870 -999.990 ... R5 2009 02 05 12 03 00 36.7300 126.1300 21.00 16.00 5.00 268764 TAP 2008 12 30 05 13 00 4589-99 G co CCGG 191.500 -999.990 ... R5 2009 02 05 12 17 00 36.7300 126.1300 21.00 16.00 5.00 268765 TAP 2009 01 09 07 10 00 1731-99 G co CCGG 195.870 -999.990 ... R5 2009 02 18 15 01 00 36.7300 126.1300 21.00 16.00 5.00 269690 TAP 2009 01 09 07 10 00 1732-99 G co CCGG 197.050 -999.990 ... R5 2009 02 18 15 15 00 36.7300 126.1300 21.00 16.00 5.00 269691 TAP 2009 01 09 07 22 00 1039-99 G co CCGG 195.640 -999.990 ... R5 2009 02 18 14 32 00 36.7300 126.1300 21.00 16.00 5.00 269688 TAP 2009 01 09 07 22 00 1040-99 G co CCGG 195.300 -999.990 ... R5 2009 02 18 14 46 00 36.7300 126.1300 21.00 16.00 5.00 269689 TAP 2009 01 14 04 57 00 4238-99 G co CCGG 168.480 -999.990 ... R5 2009 02 18 13 35 00 36.7300 126.1300 21.00 16.00 5.00 269686 TAP 2009 01 14 04 57 00 4536-99 G co CCGG 168.440 -999.990 ... R5 2009 02 18 13 49 00 36.7300 126.1300 21.00 16.00 5.00 269687 TAP 2009 01 14 05 09 00 2115-99 G co CCGG 161.720 -999.990 ... R5 2009 02 18 14 04 00 36.7300 126.1300 21.00 16.00 5.00 269692 TAP 2009 01 14 05 09 00 4087-99 G co CCGG 162.530 -999.990 ... R5 2009 02 18 14 18 00 36.7300 126.1300 21.00 16.00 5.00 269693 TAP 2009 01 25 05 35 00 4150-99 G co CCGG 215.080 -999.990 ... V2 2009 02 18 15 21 00 36.7300 126.1300 21.00 16.00 5.00 269682 TAP 2009 01 25 05 35 00 4625-99 G co CCGG 216.130 -999.990 ... V2 2009 02 18 15 36 00 36.7300 126.1300 21.00 16.00 5.00 269683 TAP 2009 01 25 05 47 00 4174-99 G co CCGG 216.800 -999.990 ... V2 2009 02 18 15 06 00 36.7300 126.1300 21.00 16.00 5.00 269679 TAP 2009 01 25 05 47 00 733-99 G co CCGG 217.600 -999.990 ... V2 2009 02 18 14 50 00 36.7300 126.1300 21.00 16.00 5.00 269678 TAP 2009 01 27 05 30 00 1191-99 G co CCGG 236.610 -999.990 ... V2 2009 02 18 13 49 00 36.7300 126.1300 21.00 16.00 5.00 269680 TAP 2009 01 27 05 30 00 1740-99 G co CCGG 236.210 -999.990 ... V2 2009 02 18 14 04 00 36.7300 126.1300 21.00 16.00 5.00 269681 TAP 2009 01 27 05 49 00 474-99 G co CCGG 237.510 -999.990 ... V2 2009 02 18 14 35 00 36.7300 126.1300 21.00 16.00 5.00 269677 TAP 2009 01 27 05 49 00 70-99 G co CCGG 237.430 -999.990 ... V2 2009 02 18 14 20 00 36.7300 126.1300 21.00 16.00 5.00 269676 TAP 2009 02 08 08 08 00 3030-99 G co CCGG 238.500 -999.990 ..C R5 2009 03 11 13 29 00 36.7300 126.1300 21.00 16.00 5.00 271225 TAP 2009 02 08 08 08 00 5021-99 G co CCGG 239.740 -999.990 ..C R5 2009 03 11 13 43 00 36.7300 126.1300 21.00 16.00 5.00 271226 TAP 2009 02 08 08 20 00 3666-99 G co CCGG 254.470 -999.990 ..C R5 2009 03 11 13 00 00 36.7300 126.1300 21.00 16.00 5.00 271227 TAP 2009 02 08 08 20 00 3875-99 G co CCGG 254.300 -999.990 ..C R5 2009 03 11 13 14 00 36.7300 126.1300 21.00 16.00 5.00 271228 TAP 2009 02 15 06 24 00 1410-99 G co CCGG 232.560 -999.990 ... V2 2009 03 06 16 32 00 36.7300 126.1300 21.00 16.00 5.00 270838 TAP 2009 02 15 06 24 00 2750-99 G co CCGG 233.210 -999.990 ... V2 2009 03 06 16 47 00 36.7300 126.1300 21.00 16.00 5.00 270839 TAP 2009 02 15 06 37 00 3834-99 G co CCGG 225.650 -999.990 ... V2 2009 03 07 11 34 00 36.7300 126.1300 21.00 16.00 5.00 270837 TAP 2009 02 15 06 37 00 832-99 G co CCGG 222.620 -999.990 ... V2 2009 03 07 11 18 00 36.7300 126.1300 21.00 16.00 5.00 270836 TAP 2009 02 16 05 05 00 1901-99 G co CCGG 230.820 -999.990 ... V2 2009 03 11 14 46 00 36.7300 126.1300 21.00 16.00 5.00 271231 TAP 2009 02 16 05 05 00 4430-99 G co CCGG 230.300 -999.990 ... V2 2009 03 11 15 02 00 36.7300 126.1300 21.00 16.00 5.00 271232 TAP 2009 02 16 05 11 00 1860-99 G co CCGG 232.330 -999.990 ..C R5 2009 03 11 13 57 00 36.7300 126.1300 21.00 16.00 5.00 271229 TAP 2009 02 16 05 11 00 3091-99 G co CCGG 232.760 -999.990 ..C R5 2009 03 11 14 11 00 36.7300 126.1300 21.00 16.00 5.00 271230 TAP 2009 02 27 05 26 00 4749-99 G co CCGG 269.130 -999.990 ..C R5 2009 03 31 14 42 00 36.7300 126.1300 21.00 16.00 5.00 272322 TAP 2009 02 27 05 26 00 528-99 G co CCGG 267.860 -999.990 ..C R5 2009 03 31 14 28 00 36.7300 126.1300 21.00 16.00 5.00 272323 TAP 2009 02 27 05 38 00 1972-99 G co CCGG 272.310 -999.990 ..C R5 2009 03 31 14 13 00 36.7300 126.1300 21.00 16.00 5.00 272325 TAP 2009 02 27 05 38 00 707-99 G co CCGG 272.650 -999.990 ..C R5 2009 03 31 13 59 00 36.7300 126.1300 21.00 16.00 5.00 272324 TAP 2009 03 08 09 06 00 3086-99 G co CCGG 200.920 -999.990 ... V2 2009 03 31 14 38 00 36.7300 126.1300 21.00 16.00 5.00 272318 TAP 2009 03 08 09 06 00 3614-99 G co CCGG 201.080 -999.990 ... V2 2009 03 31 14 53 00 36.7300 126.1300 21.00 16.00 5.00 272319 TAP 2009 03 08 09 18 00 1299-99 G co CCGG 197.690 -999.990 ... V2 2009 03 31 14 07 00 36.7300 126.1300 21.00 16.00 5.00 272320 TAP 2009 03 08 09 18 00 1570-99 G co CCGG 197.400 -999.990 ... V2 2009 03 31 14 23 00 36.7300 126.1300 21.00 16.00 5.00 272321 TAP 2009 03 10 04 40 00 1141-99 G co CCGG 195.360 -999.990 ... R5 2009 03 30 14 53 00 36.7300 126.1300 21.00 16.00 5.00 272315 TAP 2009 03 10 04 40 00 552-99 G co CCGG 195.130 -999.990 ... R5 2009 03 30 14 38 00 36.7300 126.1300 21.00 16.00 5.00 272314 TAP 2009 03 10 04 53 00 2186-99 G co CCGG 193.950 -999.990 ... R5 2009 03 30 15 07 00 36.7300 126.1300 21.00 16.00 5.00 272316 TAP 2009 03 10 04 53 00 3324-99 G co CCGG 193.630 -999.990 ... R5 2009 03 30 15 21 00 36.7300 126.1300 21.00 16.00 5.00 272317 TAP 2009 03 23 05 31 00 2778-99 G co CCGG 213.400 -999.990 ... V2 2009 04 24 12 49 00 36.7300 126.1300 21.00 16.00 5.00 274055 TAP 2009 03 23 05 31 00 4911-99 G co CCGG 213.480 -999.990 ... V2 2009 04 24 13 04 00 36.7300 126.1300 21.00 16.00 5.00 274056 TAP 2009 03 23 05 45 00 1447-99 G co CCGG 212.780 -999.990 ... V2 2009 04 24 12 18 00 36.7300 126.1300 21.00 16.00 5.00 274057 TAP 2009 03 23 05 45 00 4162-99 G co CCGG 212.860 -999.990 ... V2 2009 04 24 12 33 00 36.7300 126.1300 21.00 16.00 5.00 274058 TAP 2009 03 27 08 17 00 1700-99 G co CCGG 218.720 -999.990 ... V2 2009 04 24 13 50 00 36.7300 126.1300 21.00 16.00 5.00 274061 TAP 2009 03 27 08 17 00 4404-99 G co CCGG 218.450 -999.990 ... V2 2009 04 24 14 06 00 36.7300 126.1300 21.00 16.00 5.00 274062 TAP 2009 03 27 08 30 00 1129-99 G co CCGG 220.100 -999.990 ... V2 2009 04 24 13 20 00 36.7300 126.1300 21.00 16.00 5.00 274059 TAP 2009 03 27 08 30 00 1458-99 G co CCGG 220.350 -999.990 ... V2 2009 04 24 13 35 00 36.7300 126.1300 21.00 16.00 5.00 274060 TAP 2009 04 01 06 58 00 3715-99 G co CCGG 307.120 -999.990 ..C R5 2009 04 23 15 00 00 36.7300 126.1300 21.00 16.00 5.00 274190 TAP 2009 04 01 06 58 00 4700-99 G co CCGG 305.290 -999.990 ..C R5 2009 04 23 15 14 00 36.7300 126.1300 21.00 16.00 5.00 274191 TAP 2009 04 01 08 45 00 4006-99 G co CCGG 309.760 -999.990 ..C R5 2009 04 23 15 42 00 36.7300 126.1300 21.00 16.00 5.00 274189 TAP 2009 04 01 08 45 00 973-99 G co CCGG 310.950 -999.990 ..C R5 2009 04 23 15 28 00 36.7300 126.1300 21.00 16.00 5.00 274188 TAP 2009 04 14 06 17 00 1876-99 G co CCGG 271.050 -999.990 ... V2 2009 05 27 10 12 00 36.7300 126.1300 21.00 16.00 5.00 275806 TAP 2009 04 14 06 17 00 4555-99 G co CCGG 270.940 -999.990 ... V2 2009 05 27 10 28 00 36.7300 126.1300 21.00 16.00 5.00 275807 TAP 2009 04 14 06 25 00 4994-99 G co CCGG 270.500 -999.990 ... V2 2009 05 27 10 59 00 36.7300 126.1300 21.00 16.00 5.00 275805 TAP 2009 04 14 06 25 00 99-99 G co CCGG 271.440 -999.990 ... V2 2009 05 27 10 43 00 36.7300 126.1300 21.00 16.00 5.00 275804 TAP 2009 04 17 08 35 00 1842-99 G co CCGG 270.400 -999.990 ..C R5 2009 05 27 11 28 00 36.7300 126.1300 21.00 16.00 5.00 275810 TAP 2009 04 17 08 35 00 2283-99 G co CCGG 268.880 -999.990 ..C R5 2009 05 27 11 42 00 36.7300 126.1300 21.00 16.00 5.00 275811 TAP 2009 04 17 08 47 00 3700-99 G co CCGG 264.300 -999.990 ... V2 2009 05 27 11 29 00 36.7300 126.1300 21.00 16.00 5.00 275809 TAP 2009 04 17 08 47 00 589-99 G co CCGG 264.450 -999.990 ... V2 2009 05 27 11 14 00 36.7300 126.1300 21.00 16.00 5.00 275808 TAP 2009 04 27 06 22 00 1631-99 G co CCGG 339.580 -999.990 P.. V2 2009 05 27 15 05 00 36.7300 126.1300 21.00 16.00 5.00 275803 TAP 2009 04 27 06 22 00 333-99 G co CCGG 345.390 -999.990 P.. V2 2009 05 27 14 49 00 36.7300 126.1300 21.00 16.00 5.00 275802 TAP 2009 04 27 06 35 00 1613-99 G co CCGG 347.050 -999.990 ... V2 2009 05 27 14 34 00 36.7300 126.1300 21.00 16.00 5.00 275801 TAP 2009 04 27 06 35 00 734-99 G co CCGG 343.920 -999.990 ... V2 2009 05 27 14 19 00 36.7300 126.1300 21.00 16.00 5.00 275800 TAP 2009 05 07 06 10 00 2164-99 G co CCGG 240.290 -999.990 ... V2 2009 07 28 12 18 00 36.7300 126.1300 21.00 16.00 5.00 280135 TAP 2009 05 07 06 10 00 4284-99 G co CCGG 237.540 -999.990 ... V2 2009 07 28 12 34 00 36.7300 126.1300 21.00 16.00 5.00 280136 TAP 2009 05 07 06 23 00 1220-99 G co CCGG 228.690 -999.990 ... R5 2009 07 28 13 27 00 36.7300 126.1300 21.00 16.00 5.00 280137 TAP 2009 05 07 06 23 00 2268-99 G co CCGG 228.510 -999.990 ... R5 2009 07 28 13 41 00 36.7300 126.1300 21.00 16.00 5.00 280138 TAP 2009 05 13 06 16 00 3071-99 G co CCGG 233.500 -999.990 ..C R5 2009 07 28 12 30 00 36.7300 126.1300 21.00 16.00 5.00 280116 TAP 2009 05 13 06 16 00 3072-99 G co CCGG 233.400 -999.990 ..C R5 2009 07 28 12 44 00 36.7300 126.1300 21.00 16.00 5.00 280117 TAP 2009 05 13 06 28 00 2149-99 G co CCGG 220.400 -999.990 ... R5 2009 07 28 12 01 00 36.7300 126.1300 21.00 16.00 5.00 280120 TAP 2009 05 13 06 28 00 2150-99 G co CCGG 220.520 -999.990 ... R5 2009 07 28 12 15 00 36.7300 126.1300 21.00 16.00 5.00 280121 TAP 2009 05 18 06 09 00 2830-99 G co CCGG 359.010 -999.990 ... V2 2009 07 28 13 20 00 36.7300 126.1300 21.00 16.00 5.00 280124 TAP 2009 05 18 06 09 00 4364-99 G co CCGG 358.290 -999.990 ... V2 2009 07 28 13 36 00 36.7300 126.1300 21.00 16.00 5.00 280125 TAP 2009 05 18 06 21 00 1967-99 G co CCGG 361.050 -999.990 ... V2 2009 07 28 12 49 00 36.7300 126.1300 21.00 16.00 5.00 280126 TAP 2009 05 29 08 14 00 4815-99 G co CCGG 251.570 -999.990 ... V2 2009 08 28 12 55 00 36.7300 126.1300 21.00 16.00 5.00 282217 TAP 2009 05 29 08 14 00 4816-99 G co CCGG 250.130 -999.990 ... V2 2009 08 28 13 10 00 36.7300 126.1300 21.00 16.00 5.00 282218 TAP 2009 05 29 08 28 00 3985-99 G co CCGG 243.950 -999.990 ... V2 2009 08 28 12 24 00 36.7300 126.1300 21.00 16.00 5.00 282215 TAP 2009 05 29 08 28 00 3986-99 G co CCGG 244.810 -999.990 ... V2 2009 08 28 12 39 00 36.7300 126.1300 21.00 16.00 5.00 282216 TAP 2009 06 11 06 39 00 1857-99 G co CCGG 330.860 -999.990 ... V2 2009 08 24 16 59 00 36.7300 126.1300 21.00 16.00 5.00 281688 TAP 2009 06 11 06 39 00 1858-99 G co CCGG 331.020 -999.990 ... V2 2009 08 24 17 14 00 36.7300 126.1300 21.00 16.00 5.00 281689 TAP 2009 06 11 06 54 00 3073-99 G co CCGG 320.490 -999.990 ..C R5 2009 08 25 10 19 00 36.7300 126.1300 21.00 16.00 5.00 281690 TAP 2009 06 11 06 54 00 3074-99 G co CCGG 318.030 -999.990 ..C R5 2009 08 25 10 33 00 36.7300 126.1300 21.00 16.00 5.00 281691 TAP 2009 06 24 05 13 00 4483-99 G co CCGG 304.790 -999.990 ..C R5 2009 07 28 12 58 00 36.7300 126.1300 21.00 16.00 5.00 280122 TAP 2009 06 24 05 13 00 4484-99 G co CCGG 305.190 -999.990 ..C R5 2009 07 28 13 12 00 36.7300 126.1300 21.00 16.00 5.00 280123 TAP 2009 06 24 05 25 00 4057-99 G co CCGG 296.140 -999.990 ..C R5 2009 07 28 11 28 00 36.7300 126.1300 21.00 16.00 5.00 280118 TAP 2009 06 24 05 25 00 4058-99 G co CCGG 296.750 -999.990 ..C R5 2009 07 28 11 42 00 36.7300 126.1300 21.00 16.00 5.00 280119 TAP 2009 06 29 04 24 00 2159-99 G co CCGG 187.130 -999.990 ... V2 2009 07 28 11 48 00 36.7300 126.1300 21.00 16.00 5.00 280133 TAP 2009 06 29 04 24 00 2160-99 G co CCGG 185.590 -999.990 ... V2 2009 07 28 12 03 00 36.7300 126.1300 21.00 16.00 5.00 280134 TAP 2009 06 29 04 36 00 2639-99 G co CCGG 187.950 -999.990 ... V2 2009 07 28 11 17 00 36.7300 126.1300 21.00 16.00 5.00 280131 TAP 2009 06 29 04 36 00 2640-99 G co CCGG 188.880 -999.990 ... V2 2009 07 28 11 32 00 36.7300 126.1300 21.00 16.00 5.00 280132 TAP 2009 07 03 06 19 00 1813-99 G co CCGG 253.740 -999.990 ... V2 2009 07 27 11 34 00 36.7300 126.1300 21.00 16.00 5.00 279919 TAP 2009 07 03 06 19 00 1814-99 G co CCGG 253.610 -999.990 ... V2 2009 07 27 11 49 00 36.7300 126.1300 21.00 16.00 5.00 279920 TAP 2009 07 03 06 31 00 4505-99 G co CCGG 254.950 -999.990 ... V2 2009 07 27 12 05 00 36.7300 126.1300 21.00 16.00 5.00 279921 TAP 2009 07 03 06 31 00 4506-99 G co CCGG 253.490 -999.990 ... V2 2009 07 27 12 20 00 36.7300 126.1300 21.00 16.00 5.00 279922 TAP 2009 07 21 02 56 00 1471-99 G co CCGG 389.900 -999.990 .X. V2 2009 08 31 10 43 00 36.7300 126.1300 21.00 16.00 5.00 282211 TAP 2009 07 21 02 56 00 1832-99 G co CCGG 389.960 -999.990 .X. V2 2009 08 31 10 59 00 36.7300 126.1300 21.00 16.00 5.00 282212 TAP 2009 07 21 03 09 00 2116-99 G co CCGG 391.500 -999.990 .X. V2 2009 08 28 16 15 00 36.7300 126.1300 21.00 16.00 5.00 282214 TAP 2009 07 21 03 09 00 579-99 G co CCGG 390.420 -999.990 .X. V2 2009 08 28 16 00 00 36.7300 126.1300 21.00 16.00 5.00 282213 TAP 2009 07 23 06 43 00 4734-99 G co CCGG 243.480 -999.990 ... V2 2009 08 28 15 44 00 36.7300 126.1300 21.00 16.00 5.00 282210 TAP 2009 07 23 06 43 00 798-99 G co CCGG 244.990 -999.990 ... V2 2009 08 28 15 29 00 36.7300 126.1300 21.00 16.00 5.00 282209 TAP 2009 07 23 15 30 00 2645-99 G co CCGG 233.560 -999.990 ... V2 2009 08 28 14 58 00 36.7300 126.1300 21.00 16.00 5.00 282207 TAP 2009 07 23 15 30 00 3186-99 G co CCGG 234.880 -999.990 ... V2 2009 08 28 15 14 00 36.7300 126.1300 21.00 16.00 5.00 282208 TAP 2009 07 31 06 47 00 4908-99 G co CCGG 162.130 -999.990 ... V2 2009 08 28 13 57 00 36.7300 126.1300 21.00 16.00 5.00 282219 TAP 2009 07 31 06 59 00 1398-99 G co CCGG 164.880 -999.990 ... V2 2009 08 28 13 41 00 36.7300 126.1300 21.00 16.00 5.00 282221 TAP 2009 07 31 06 59 00 947-99 G co CCGG 164.070 -999.990 ... V2 2009 08 28 13 26 00 36.7300 126.1300 21.00 16.00 5.00 282220 TAP 2009 08 08 05 05 00 2186-99 G co CCGG 136.420 -999.990 ... V2 2009 09 23 13 29 00 36.7300 126.1300 21.00 16.00 5.00 283763 TAP 2009 08 08 05 05 00 4644-99 G co CCGG 135.760 -999.990 ... V2 2009 09 23 13 45 00 36.7300 126.1300 21.00 16.00 5.00 283764 TAP 2009 08 08 05 15 00 1547-99 G co CCGG 139.040 -999.990 ... V2 2009 09 23 14 00 00 36.7300 126.1300 21.00 16.00 5.00 283765 TAP 2009 08 08 05 15 00 3567-99 G co CCGG 138.570 -999.990 ... V2 2009 09 23 14 16 00 36.7300 126.1300 21.00 16.00 5.00 283766 TAP 2009 08 24 06 41 00 2460-99 G co CCGG 446.690 -999.990 .X. V2 2009 09 28 13 11 00 36.7300 126.1300 21.00 16.00 5.00 284096 TAP 2009 08 24 06 41 00 4762-99 G co CCGG 446.570 -999.990 .X. V2 2009 09 28 13 26 00 36.7300 126.1300 21.00 16.00 5.00 284097 TAP 2009 08 24 06 54 00 4510-99 G co CCGG 444.580 -999.990 .X. V2 2009 09 28 12 55 00 36.7300 126.1300 21.00 16.00 5.00 284099 TAP 2009 08 24 06 54 00 897-99 G co CCGG 442.290 -999.990 .X. V2 2009 09 28 12 40 00 36.7300 126.1300 21.00 16.00 5.00 284098 TAP 2009 08 31 06 05 00 1470-99 G co CCGG 141.860 -999.990 ... V2 2009 09 25 14 42 00 36.7300 126.1300 21.00 16.00 5.00 284002 TAP 2009 08 31 06 05 00 4655-99 G co CCGG 141.950 -999.990 ... V2 2009 09 25 14 57 00 36.7300 126.1300 21.00 16.00 5.00 284003 TAP 2009 08 31 06 18 00 3036-99 G co CCGG 142.410 -999.990 ... V2 2009 09 25 15 28 00 36.7300 126.1300 21.00 16.00 5.00 284005 TAP 2009 08 31 06 18 00 784-99 G co CCGG 143.850 -999.990 ... V2 2009 09 25 15 13 00 36.7300 126.1300 21.00 16.00 5.00 284004 TAP 2009 09 05 08 23 00 4614-99 G co CCGG 191.280 -999.990 ... V2 2009 11 17 13 57 00 36.7300 126.1300 21.00 16.00 5.00 286059 TAP 2009 09 05 08 23 00 523-99 G co CCGG 191.560 -999.990 ... V2 2009 11 17 13 42 00 36.7300 126.1300 21.00 16.00 5.00 286058 TAP 2009 09 05 08 35 00 1968-99 G co CCGG 190.920 -999.990 ... V2 2009 11 17 14 13 00 36.7300 126.1300 21.00 16.00 5.00 286056 TAP 2009 09 05 08 35 00 2323-99 G co CCGG 191.060 -999.990 ... V2 2009 11 17 14 28 00 36.7300 126.1300 21.00 16.00 5.00 286057 TAP 2009 09 08 05 09 00 283-99 G co CCGG 205.160 -999.990 ... V2 2009 09 28 11 54 00 36.7300 126.1300 21.00 16.00 5.00 284008 TAP 2009 09 08 05 09 00 3526-99 G co CCGG 206.110 -999.990 ... V2 2009 09 28 11 38 00 36.7300 126.1300 21.00 16.00 5.00 284009 TAP 2009 09 08 05 21 00 1958-99 G co CCGG 204.140 -999.990 ... V2 2009 09 25 15 44 00 36.7300 126.1300 21.00 16.00 5.00 284006 TAP 2009 09 08 05 21 00 4109-99 G co CCGG 203.730 -999.990 ... V2 2009 09 25 15 59 00 36.7300 126.1300 21.00 16.00 5.00 284007 TAP 2009 09 13 04 30 00 1212-99 G co CCGG 228.720 -999.990 ... V2 2009 09 24 14 56 00 36.7300 126.1300 21.00 16.00 5.00 283905 TAP 2009 09 13 04 30 00 4413-99 G co CCGG 229.120 -999.990 ... V2 2009 09 24 15 12 00 36.7300 126.1300 21.00 16.00 5.00 283906 TAP 2009 09 13 04 42 00 3507-99 G co CCGG 232.090 -999.990 ... V2 2009 09 24 14 41 00 36.7300 126.1300 21.00 16.00 5.00 283904 TAP 2009 09 13 04 42 00 570-99 G co CCGG 231.270 -999.990 ... V2 2009 09 24 14 25 00 36.7300 126.1300 21.00 16.00 5.00 283903 TAP 2009 09 28 06 22 00 3651-99 G co CCGG 199.310 -999.990 ... V2 2009 11 13 15 09 00 36.7300 126.1300 21.00 16.00 5.00 285887 TAP 2009 09 28 06 22 00 3743-99 G co CCGG 199.880 -999.990 ... V2 2009 11 13 15 24 00 36.7300 126.1300 21.00 16.00 5.00 285888 TAP 2009 09 28 06 36 00 107-99 G co CCGG 203.640 -999.990 ... V2 2009 11 13 15 40 00 36.7300 126.1300 21.00 16.00 5.00 285885 TAP 2009 09 28 06 36 00 1561-99 G co CCGG 201.000 -999.990 ... V2 2009 11 13 15 55 00 36.7300 126.1300 21.00 16.00 5.00 285886 TAP 2009 10 05 06 26 00 1424-99 G co CCGG 142.950 -999.990 ... V2 2009 11 30 11 44 00 36.7300 126.1300 21.00 16.00 5.00 286680 TAP 2009 10 05 06 26 00 4983-99 G co CCGG 142.120 -999.990 ... V2 2009 11 30 12 00 00 36.7300 126.1300 21.00 16.00 5.00 286681 TAP 2009 10 05 06 38 00 1086-99 G co CCGG 142.750 -999.990 ... V2 2009 11 30 11 14 00 36.7300 126.1300 21.00 16.00 5.00 286682 TAP 2009 10 05 06 38 00 3793-99 G co CCGG 141.940 -999.990 ... V2 2009 11 30 11 29 00 36.7300 126.1300 21.00 16.00 5.00 286683 TAP 2009 10 10 05 52 00 1030-99 G co CCGG 301.340 -999.990 ... V2 2009 11 30 10 43 00 36.7300 126.1300 21.00 16.00 5.00 286684 TAP 2009 10 10 05 52 00 3933-99 G co CCGG 303.370 -999.990 ... V2 2009 11 30 10 58 00 36.7300 126.1300 21.00 16.00 5.00 286685 TAP 2009 10 10 06 04 00 1299-99 G co CCGG 315.620 -999.990 .X. V2 2009 11 30 13 17 00 36.7300 126.1300 21.00 16.00 5.00 286686 TAP 2009 10 10 06 04 00 3086-99 G co CCGG 316.460 -999.990 .X. V2 2009 11 30 13 32 00 36.7300 126.1300 21.00 16.00 5.00 286687 TAP 2009 10 17 05 37 00 2324-99 G co CCGG 145.460 -999.990 ... V2 2009 11 18 10 27 00 36.7300 126.1300 21.00 16.00 5.00 286050 TAP 2009 10 17 05 37 00 4014-99 G co CCGG 145.330 -999.990 ... V2 2009 11 18 10 42 00 36.7300 126.1300 21.00 16.00 5.00 286051 TAP 2009 10 17 05 51 00 4087-99 G co CCGG 145.670 -999.990 ... V2 2009 11 17 17 33 00 36.7300 126.1300 21.00 16.00 5.00 286049 TAP 2009 10 17 05 51 00 70-99 G co CCGG 146.800 -999.990 ... V2 2009 11 17 17 18 00 36.7300 126.1300 21.00 16.00 5.00 286048 TAP 2009 10 19 07 07 00 4718-99 G co CCGG 125.750 -999.990 ... V2 2009 11 17 12 56 00 36.7300 126.1300 21.00 16.00 5.00 286053 TAP 2009 10 19 07 07 00 552-99 G co CCGG 126.370 -999.990 ... V2 2009 11 17 12 40 00 36.7300 126.1300 21.00 16.00 5.00 286052 TAP 2009 10 19 07 22 00 1141-99 G co CCGG 126.830 -999.990 ... V2 2009 11 17 13 11 00 36.7300 126.1300 21.00 16.00 5.00 286054 TAP 2009 10 19 07 22 00 3324-99 G co CCGG 126.900 -999.990 ... V2 2009 11 17 13 27 00 36.7300 126.1300 21.00 16.00 5.00 286055 TAP 2009 11 02 05 30 00 2340-99 G co CCGG 122.850 -999.990 ... V2 2009 12 16 17 33 00 36.7300 126.1300 21.00 16.00 5.00 287655 TAP 2009 11 02 05 30 00 2421-99 G co CCGG 123.040 -999.990 ... V2 2009 12 16 17 49 00 36.7300 126.1300 21.00 16.00 5.00 287656 TAP 2009 11 02 05 45 00 1175-99 G co CCGG 124.580 -999.990 ... V2 2009 12 16 17 02 00 36.7300 126.1300 21.00 16.00 5.00 287653 TAP 2009 11 02 05 45 00 2992-99 G co CCGG 124.510 -999.990 ... V2 2009 12 16 17 18 00 36.7300 126.1300 21.00 16.00 5.00 287654 TAP 2009 11 16 05 33 00 155-99 G co CCGG 166.300 -999.990 ... V2 2010 01 04 15 33 00 36.7300 126.1300 21.00 16.00 5.00 287957 TAP 2009 11 16 05 33 00 2999-99 G co CCGG 168.070 -999.990 ... V2 2010 01 04 15 49 00 36.7300 126.1300 21.00 16.00 5.00 287958 TAP 2009 11 16 05 45 00 3433-99 G co CCGG 165.500 -999.990 ... V2 2010 01 05 10 48 00 36.7300 126.1300 21.00 16.00 5.00 287955 TAP 2009 11 16 05 45 00 4806-99 G co CCGG 165.150 -999.990 ... V2 2010 01 05 11 03 00 36.7300 126.1300 21.00 16.00 5.00 287956 TAP 2009 11 28 05 52 00 1807-99 G co CCGG 565.760 -999.990 .X. V2 2010 02 04 13 50 00 36.7300 126.1300 21.00 16.00 5.00 289422 TAP 2009 11 28 05 52 00 446-99 G co CCGG 564.190 -999.990 .X. V2 2010 02 04 13 35 00 36.7300 126.1300 21.00 16.00 5.00 289421 TAP 2009 11 28 06 05 00 1238-99 G co CCGG 558.330 -999.990 .X. V2 2010 02 03 11 40 00 36.7300 126.1300 21.00 16.00 5.00 289403 TAP 2009 11 28 06 05 00 2556-99 G co CCGG 558.460 -999.990 .X. V2 2010 02 03 11 55 00 36.7300 126.1300 21.00 16.00 5.00 289404 TAP 2009 12 07 04 02 00 1132-99 G co CCGG 415.920 -999.990 .X. V2 2010 03 10 09 59 00 36.7300 126.1300 21.00 16.00 5.00 291484 TAP 2009 12 07 04 02 00 376-99 G co CCGG 416.070 -999.990 .X. V2 2010 03 10 09 44 00 36.7300 126.1300 21.00 16.00 5.00 291483 TAP 2009 12 07 06 16 00 3338-99 G co CCGG 397.270 -999.990 .X. V2 2010 03 10 11 00 00 36.7300 126.1300 21.00 16.00 5.00 291486 TAP 2009 12 07 06 16 00 3834-99 G co CCGG 397.400 -999.990 .X. V2 2010 03 10 10 45 00 36.7300 126.1300 21.00 16.00 5.00 291485 TAP 2009 12 13 05 11 00 1033-99 G co CCGG 190.870 -999.990 ... R5 2010 02 11 11 48 00 36.7300 126.1300 21.00 16.00 5.00 289529 TAP 2009 12 13 06 58 00 2468-99 G co CCGG 175.270 -999.990 ... V2 2010 02 08 14 27 00 36.7300 126.1300 21.00 16.00 5.00 289530 TAP 2009 12 13 06 58 00 3165-99 G co CCGG 176.000 -999.990 ... V2 2010 02 08 14 43 00 36.7300 126.1300 21.00 16.00 5.00 289531 TAP 2009 12 21 05 54 00 1407-99 G co CCGG 227.470 -999.990 ... V2 2010 03 05 12 05 00 36.7300 126.1300 21.00 16.00 5.00 291068 TAP 2009 12 21 05 54 00 2383-99 G co CCGG 228.170 -999.990 ... V2 2010 03 05 12 21 00 36.7300 126.1300 21.00 16.00 5.00 291069 TAP 2009 12 21 06 07 00 2773-99 G co CCGG 225.620 -999.990 ... V2 2010 03 05 11 35 00 36.7300 126.1300 21.00 16.00 5.00 291066 TAP 2009 12 21 06 07 00 4756-99 G co CCGG 224.520 -999.990 ... V2 2010 03 05 11 50 00 36.7300 126.1300 21.00 16.00 5.00 291067 TAP 2010 01 12 05 37 00 2473-99 G co CCGG 230.270 -999.990 ... V2 2010 03 05 10 34 00 36.7300 126.1300 21.00 16.00 5.00 291062 TAP 2010 01 12 05 37 00 2734-99 G co CCGG 232.700 -999.990 ... V2 2010 03 05 10 49 00 36.7300 126.1300 21.00 16.00 5.00 291063 TAP 2010 01 12 06 40 00 2697-99 G co CCGG 270.590 -999.990 P.. V2 2010 03 05 11 04 00 36.7300 126.1300 21.00 16.00 5.00 291064 TAP 2010 01 12 06 40 00 3156-99 G co CCGG 254.440 -999.990 P.. V2 2010 03 05 11 20 00 36.7300 126.1300 21.00 16.00 5.00 291065 TAP 2010 01 21 07 04 00 2459-99 G co CCGG 175.340 -999.990 ... R5 2010 03 31 12 48 00 36.7300 126.1300 21.00 16.00 5.00 292556 TAP 2010 01 21 07 04 00 934-99 G co CCGG 175.920 -999.990 ... R5 2010 03 31 12 33 00 36.7300 126.1300 21.00 16.00 5.00 292555 TAP 2010 01 21 07 16 00 1237-99 G co CCGG 177.190 -999.990 ... R5 2010 03 31 12 19 00 36.7300 126.1300 21.00 16.00 5.00 292558 TAP 2010 01 21 07 16 00 719-99 G co CCGG 175.230 -999.990 ... R5 2010 03 31 12 04 00 36.7300 126.1300 21.00 16.00 5.00 292557 TAP 2010 01 29 05 46 00 3465-99 G co CCGG 170.380 -999.990 ... V2 2010 03 10 12 19 00 36.7300 126.1300 21.00 16.00 5.00 291501 TAP 2010 01 29 05 46 00 3766-99 G co CCGG 169.920 -999.990 ... V2 2010 03 10 12 35 00 36.7300 126.1300 21.00 16.00 5.00 291502 TAP 2010 01 29 05 57 00 2783-99 G co CCGG 172.830 -999.990 ... V2 2010 03 10 13 05 00 36.7300 126.1300 21.00 16.00 5.00 291504 TAP 2010 01 29 05 57 00 832-99 G co CCGG 172.720 -999.990 ... V2 2010 03 10 12 50 00 36.7300 126.1300 21.00 16.00 5.00 291503 TAP 2010 02 02 05 33 00 2293-99 G co CCGG 180.690 -999.990 ... V2 2010 03 09 17 05 00 36.7300 126.1300 21.00 16.00 5.00 291479 TAP 2010 02 02 05 33 00 3949-99 G co CCGG 179.400 -999.990 ... V2 2010 03 09 17 20 00 36.7300 126.1300 21.00 16.00 5.00 291480 TAP 2010 02 02 05 45 00 410-99 G co CCGG 180.240 -999.990 ... V2 2010 03 09 16 34 00 36.7300 126.1300 21.00 16.00 5.00 291481 TAP 2010 02 02 05 45 00 4285-99 G co CCGG 180.400 -999.990 ... V2 2010 03 09 16 49 00 36.7300 126.1300 21.00 16.00 5.00 291482 TAP 2010 02 13 07 23 00 91-99 G co CCGG 299.760 -999.990 ..C R5 2010 03 31 13 03 00 36.7300 126.1300 21.00 16.00 5.00 292559 TAP 2010 02 13 07 23 00 92-99 G co CCGG 300.390 -999.990 ..C R5 2010 03 31 13 18 00 36.7300 126.1300 21.00 16.00 5.00 292560 TAP 2010 02 13 07 35 00 4481-99 G co CCGG 292.030 -999.990 ..C R5 2010 03 31 13 33 00 36.7300 126.1300 21.00 16.00 5.00 292561 TAP 2010 02 13 07 35 00 4482-99 G co CCGG 293.360 -999.990 ..C R5 2010 03 31 13 47 00 36.7300 126.1300 21.00 16.00 5.00 292562 TAP 2010 02 18 05 45 00 3624-99 G co CCGG 191.290 -999.990 ... V2 2010 03 31 14 26 00 36.7300 126.1300 21.00 16.00 5.00 292567 TAP 2010 02 18 05 45 00 4929-99 G co CCGG 191.890 -999.990 ... V2 2010 03 31 14 42 00 36.7300 126.1300 21.00 16.00 5.00 292568 TAP 2010 02 18 05 58 00 2498-99 G co CCGG 191.490 -999.990 ... V2 2010 03 31 13 56 00 36.7300 126.1300 21.00 16.00 5.00 292569 TAP 2010 02 18 05 58 00 2600-99 G co CCGG 190.940 -999.990 ... V2 2010 03 31 14 11 00 36.7300 126.1300 21.00 16.00 5.00 292570 TAP 2010 03 07 05 45 00 2934-99 G co CCGG 269.790 -999.990 ..C R5 2010 04 22 16 39 00 36.7300 126.1300 21.00 16.00 5.00 295076 TAP 2010 03 07 05 45 00 3036-99 G co CCGG 270.130 -999.990 ..C R5 2010 04 22 16 54 00 36.7300 126.1300 21.00 16.00 5.00 295077 TAP 2010 03 07 05 58 00 1212-99 G co CCGG 271.950 -999.990 ..C R5 2010 04 22 16 24 00 36.7300 126.1300 21.00 16.00 5.00 295079 TAP 2010 03 07 05 58 00 784-99 G co CCGG 270.030 -999.990 ..C R5 2010 04 22 16 10 00 36.7300 126.1300 21.00 16.00 5.00 295078 TAP 2010 03 16 05 35 00 1832-99 G co CCGG 220.350 -999.990 ... R5 2010 04 22 15 40 00 36.7300 126.1300 21.00 16.00 5.00 295072 TAP 2010 03 16 05 35 00 3458-99 G co CCGG 220.390 -999.990 ... R5 2010 04 22 15 55 00 36.7300 126.1300 21.00 16.00 5.00 295073 TAP 2010 03 16 05 48 00 2063-99 G co CCGG 219.490 -999.990 ... R5 2010 04 22 15 26 00 36.7300 126.1300 21.00 16.00 5.00 295075 TAP 2010 03 16 05 48 00 424-99 G co CCGG 220.140 -999.990 ... R5 2010 04 22 15 11 00 36.7300 126.1300 21.00 16.00 5.00 295074 TAP 2010 03 19 05 18 00 2606-99 G co CCGG 196.550 -999.990 ... R5 2010 04 22 13 13 00 36.7300 126.1300 21.00 16.00 5.00 295064 TAP 2010 03 19 05 18 00 2891-99 G co CCGG 197.920 -999.990 ... R5 2010 04 22 13 28 00 36.7300 126.1300 21.00 16.00 5.00 295065 TAP 2010 03 19 05 25 00 156-99 G co CCGG 193.170 -999.990 ... R5 2010 04 22 13 43 00 36.7300 126.1300 21.00 16.00 5.00 295066 TAP 2010 03 19 05 25 00 4540-99 G co CCGG 192.270 -999.990 ... R5 2010 04 22 13 58 00 36.7300 126.1300 21.00 16.00 5.00 295067 TAP 2010 03 26 05 55 00 3310-99 G co CCGG 406.420 -999.990 P.. V2 2010 04 20 12 43 00 36.7300 126.1300 21.00 16.00 5.00 294912 TAP 2010 03 26 05 55 00 743-99 G co CCGG 403.050 -999.990 P.. V2 2010 04 20 12 28 00 36.7300 126.1300 21.00 16.00 5.00 294913 TAP 2010 03 26 06 14 00 288-99 G co CCGG 398.510 -999.990 .X. V2 2010 04 20 14 00 00 36.7300 126.1300 21.00 16.00 5.00 294910 TAP 2010 03 26 06 14 00 2927-99 G co CCGG 399.690 -999.990 .X. V2 2010 04 20 14 15 00 36.7300 126.1300 21.00 16.00 5.00 294911 TAP 2010 04 02 05 50 00 1696-99 G co CCGG 314.670 -999.990 ... V2 2010 05 21 12 53 00 36.7300 126.1300 21.00 16.00 5.00 296554 TAP 2010 04 02 05 50 00 1923-99 G co CCGG 314.360 -999.990 ... V2 2010 05 21 13 08 00 36.7300 126.1300 21.00 16.00 5.00 296555 TAP 2010 04 02 06 04 00 1681-99 G co CCGG 309.630 -999.990 ... V2 2010 05 21 13 24 00 36.7300 126.1300 21.00 16.00 5.00 296556 TAP 2010 04 02 06 04 00 3000-99 G co CCGG 309.590 -999.990 ... V2 2010 05 21 13 39 00 36.7300 126.1300 21.00 16.00 5.00 296557 TAP 2010 04 05 07 45 00 1141-99 G co CCGG 362.220 -999.990 P.. V2 2010 05 24 11 55 00 36.7300 126.1300 21.00 16.00 5.00 296550 TAP 2010 04 05 07 45 00 4854-99 G co CCGG 347.310 -999.990 P.. V2 2010 05 24 12 10 00 36.7300 126.1300 21.00 16.00 5.00 296551 TAP 2010 04 05 08 00 00 2053-99 G co CCGG 411.210 -999.990 .X. V2 2010 05 24 11 40 00 36.7300 126.1300 21.00 16.00 5.00 296553 TAP 2010 04 05 08 00 00 637-99 G co CCGG 410.700 -999.990 .X. V2 2010 05 24 11 24 00 36.7300 126.1300 21.00 16.00 5.00 296552 TAP 2010 04 13 05 41 00 2422-99 G co CCGG 176.800 -999.990 ... V2 2010 05 24 10 54 00 36.7300 126.1300 21.00 16.00 5.00 296546 TAP 2010 04 13 05 41 00 4387-99 G co CCGG 176.180 -999.990 ... V2 2010 05 24 11 09 00 36.7300 126.1300 21.00 16.00 5.00 296547 TAP 2010 04 13 05 57 00 140-99 G co CCGG 174.170 -999.990 ... V2 2010 05 21 16 27 00 36.7300 126.1300 21.00 16.00 5.00 296548 TAP 2010 04 13 05 57 00 2722-99 G co CCGG 174.150 -999.990 ... V2 2010 05 21 16 42 00 36.7300 126.1300 21.00 16.00 5.00 296549 TAP 2010 04 24 05 24 00 1392-99 G co CCGG 317.060 -999.990 ... V2 2010 06 07 11 36 00 36.7300 126.1300 21.00 16.00 5.00 297569 TAP 2010 04 24 05 24 00 944-99 G co CCGG 316.770 -999.990 ... V2 2010 06 07 11 21 00 36.7300 126.1300 21.00 16.00 5.00 297568 TAP 2010 04 24 05 34 00 1190-99 G co CCGG 320.250 -999.990 ... V2 2010 06 07 11 51 00 36.7300 126.1300 21.00 16.00 5.00 297566 TAP 2010 04 24 05 34 00 2991-99 G co CCGG 318.290 -999.990 ... V2 2010 06 07 12 06 00 36.7300 126.1300 21.00 16.00 5.00 297567 TAP 2010 04 27 05 56 00 1695-99 G co CCGG 248.760 -999.990 ..C R5 2010 06 03 11 45 00 36.7300 126.1300 21.00 16.00 5.00 297574 TAP 2010 04 27 05 56 00 3324-99 G co CCGG 249.290 -999.990 ..C R5 2010 06 03 12 00 00 36.7300 126.1300 21.00 16.00 5.00 297575 TAP 2010 04 27 06 10 00 1576-99 G co CCGG 261.370 -999.990 ..C R5 2010 06 03 11 15 00 36.7300 126.1300 21.00 16.00 5.00 297576 TAP 2010 04 27 06 10 00 2545-99 G co CCGG 259.690 -999.990 ..C R5 2010 06 03 11 30 00 36.7300 126.1300 21.00 16.00 5.00 297577 TAP 2010 05 08 05 25 00 1789-99 G co CCGG 313.880 -999.990 ..C R5 2010 06 25 14 59 00 36.7300 126.1300 21.00 16.00 5.00 298923 TAP 2010 05 08 05 25 00 4121-99 G co CCGG 314.270 -999.990 ..C R5 2010 06 25 15 14 00 36.7300 126.1300 21.00 16.00 5.00 298924 TAP 2010 05 08 05 37 00 1452-99 G co CCGG 312.190 -999.990 ..C R5 2010 06 25 15 28 00 36.7300 126.1300 21.00 16.00 5.00 298925 TAP 2010 05 08 05 37 00 4276-99 G co CCGG 312.270 -999.990 ..C R5 2010 06 25 15 43 00 36.7300 126.1300 21.00 16.00 5.00 298926 TAP 2010 05 16 06 43 00 1355-99 G co CCGG 316.990 -999.990 P.C R5 2010 06 25 16 27 00 36.7300 126.1300 21.00 16.00 5.00 298927 TAP 2010 05 16 06 43 00 1356-99 G co CCGG 244.070 -999.990 P.C R5 2010 06 25 16 42 00 36.7300 126.1300 21.00 16.00 5.00 298928 TAP 2010 05 16 06 56 00 2577-99 G co CCGG 228.710 -999.990 ..C R5 2010 06 25 15 58 00 36.7300 126.1300 21.00 16.00 5.00 298929 TAP 2010 05 16 06 56 00 2578-99 G co CCGG 228.190 -999.990 ..C R5 2010 06 25 16 12 00 36.7300 126.1300 21.00 16.00 5.00 298930 TAP 2010 05 25 06 27 00 421-99 G co CCGG 257.360 -999.990 ... V2 2010 07 07 14 49 00 36.7300 126.1300 21.00 16.00 5.00 299802 TAP 2010 05 25 06 27 00 422-99 G co CCGG 256.050 -999.990 ... V2 2010 07 07 15 04 00 36.7300 126.1300 21.00 16.00 5.00 299803 TAP 2010 05 25 06 40 00 185-99 G co CCGG 261.090 -999.990 ... V2 2010 07 07 14 18 00 36.7300 126.1300 21.00 16.00 5.00 299804 TAP 2010 05 25 06 40 00 186-99 G co CCGG 259.850 -999.990 ... V2 2010 07 07 14 33 00 36.7300 126.1300 21.00 16.00 5.00 299805 TAP 2010 06 01 08 27 00 1335-99 G co CCGG 272.920 -999.990 P.. V2 2010 07 07 16 20 00 36.7300 126.1300 21.00 16.00 5.00 299794 TAP 2010 06 01 08 27 00 4247-99 G co CCGG 279.960 -999.990 P.. V2 2010 07 07 16 36 00 36.7300 126.1300 21.00 16.00 5.00 299795 TAP 2010 06 01 08 40 00 2645-99 G co CCGG 279.860 -999.990 ... V2 2010 07 09 13 55 00 36.7300 126.1300 21.00 16.00 5.00 299792 TAP 2010 06 01 08 40 00 4891-99 G co CCGG 278.090 -999.990 ... V2 2010 07 09 14 10 00 36.7300 126.1300 21.00 16.00 5.00 299793 TAP 2010 06 06 06 26 00 4359-99 G co CCGG 194.070 -999.990 ... V2 2010 07 09 14 56 00 36.7300 126.1300 21.00 16.00 5.00 299798 TAP 2010 06 06 06 26 00 4360-99 G co CCGG 191.480 -999.990 ... V2 2010 07 09 15 11 00 36.7300 126.1300 21.00 16.00 5.00 299799 TAP 2010 06 06 06 40 00 3873-99 G co CCGG 196.470 -999.990 ... V2 2010 07 09 14 25 00 36.7300 126.1300 21.00 16.00 5.00 299796 TAP 2010 06 06 06 40 00 3874-99 G co CCGG 196.020 -999.990 ... V2 2010 07 09 14 40 00 36.7300 126.1300 21.00 16.00 5.00 299797 TAP 2010 06 25 06 00 00 2830-99 G co CCGG 319.960 -999.990 ..C R5 2010 07 29 11 46 00 36.7300 126.1300 21.00 16.00 5.00 300640 TAP 2010 06 25 06 00 00 4326-99 G co CCGG 321.560 -999.990 ..C R5 2010 07 29 12 01 00 36.7300 126.1300 21.00 16.00 5.00 300641 TAP 2010 06 25 06 14 00 1869-99 G co CCGG 307.710 -999.990 P.C R5 2010 07 29 11 11 00 36.7300 126.1300 21.00 16.00 5.00 300642 TAP 2010 06 25 06 14 00 3030-99 G co CCGG 300.170 -999.990 P.C R5 2010 07 29 11 26 00 36.7300 126.1300 21.00 16.00 5.00 300643 TAP 2010 07 05 06 08 00 3257-99 G co CCGG 307.490 -999.990 ... V2 2010 08 09 14 46 00 36.7300 126.1300 21.00 16.00 5.00 301512 TAP 2010 07 05 06 08 00 4860-99 G co CCGG 307.940 -999.990 ... V2 2010 08 09 15 01 00 36.7300 126.1300 21.00 16.00 5.00 301513 TAP 2010 07 05 06 21 00 4393-99 G co CCGG 309.150 -999.990 ... V2 2010 08 09 16 02 00 36.7300 126.1300 21.00 16.00 5.00 301511 TAP 2010 07 05 06 21 00 658-99 G co CCGG 309.450 -999.990 ... V2 2010 08 09 15 47 00 36.7300 126.1300 21.00 16.00 5.00 301510 TAP 2010 07 12 05 53 00 1567-99 G co CCGG 242.190 -999.990 ... V2 2010 08 06 15 22 00 36.7300 126.1300 21.00 16.00 5.00 301396 TAP 2010 07 12 05 53 00 3665-99 G co CCGG 242.830 -999.990 ... V2 2010 08 06 15 37 00 36.7300 126.1300 21.00 16.00 5.00 301397 TAP 2010 07 12 06 11 00 3344-99 G co CCGG 237.100 -999.990 ... V2 2010 08 06 14 51 00 36.7300 126.1300 21.00 16.00 5.00 301394 TAP 2010 07 12 06 11 00 4133-99 G co CCGG 237.810 -999.990 ... V2 2010 08 06 15 06 00 36.7300 126.1300 21.00 16.00 5.00 301395 TAP 2010 07 21 03 58 00 1016-99 G co CCGG 82.570 -999.990 ... V2 2010 08 06 14 21 00 36.7300 126.1300 21.00 16.00 5.00 301391 TAP 2010 07 21 03 58 00 1993-99 G co CCGG 82.350 -999.990 ... V2 2010 08 06 14 36 00 36.7300 126.1300 21.00 16.00 5.00 301392 TAP 2010 07 21 04 10 00 523-99 G co CCGG 82.670 -999.990 ... R5 2010 08 19 14 15 00 36.7300 126.1300 21.00 16.00 5.00 301393 TAP 2010 07 29 06 20 00 3035-99 G co CCGG 97.150 -999.990 ... V2 2010 09 10 09 53 00 36.7300 126.1300 21.00 16.00 5.00 303497 TAP 2010 07 29 06 20 00 4525-99 G co CCGG 96.410 -999.990 ... V2 2010 09 10 10 09 00 36.7300 126.1300 21.00 16.00 5.00 303498 TAP 2010 07 29 06 32 00 2-99 G co CCGG 95.470 -999.990 ... V2 2010 09 10 10 24 00 36.7300 126.1300 21.00 16.00 5.00 303499 TAP 2010 07 29 06 32 00 4275-99 G co CCGG 94.710 -999.990 ... V2 2010 09 10 10 39 00 36.7300 126.1300 21.00 16.00 5.00 303500 TAP 2010 08 03 06 34 00 1347-99 G co CCGG 335.020 -999.990 .X. V2 2010 09 10 10 55 00 36.7300 126.1300 21.00 16.00 5.00 303501 TAP 2010 08 03 06 34 00 4105-99 G co CCGG 334.710 -999.990 .X. V2 2010 09 10 11 10 00 36.7300 126.1300 21.00 16.00 5.00 303502 TAP 2010 08 03 06 47 00 2625-99 G co CCGG 332.620 -999.990 P.. V2 2010 09 10 11 26 00 36.7300 126.1300 21.00 16.00 5.00 303503 TAP 2010 08 03 06 47 00 4106-99 G co CCGG 329.310 -999.990 P.. V2 2010 09 10 11 41 00 36.7300 126.1300 21.00 16.00 5.00 303504 TAP 2010 08 08 07 03 00 1561-99 G co CCGG 104.820 -999.990 ... V2 2010 09 21 10 32 00 36.7300 126.1300 21.00 16.00 5.00 304055 TAP 2010 08 08 07 03 00 3743-99 G co CCGG 104.130 -999.990 ... V2 2010 09 21 10 48 00 36.7300 126.1300 21.00 16.00 5.00 304056 TAP 2010 08 08 07 15 00 4375-99 G co CCGG 107.970 -999.990 ... V2 2010 09 21 11 03 00 36.7300 126.1300 21.00 16.00 5.00 304053 TAP 2010 08 08 07 15 00 4907-99 G co CCGG 108.210 -999.990 ... V2 2010 09 21 11 18 00 36.7300 126.1300 21.00 16.00 5.00 304054 TAP 2010 08 17 07 33 00 1450-99 G co CCGG 343.350 -999.990 .X. V2 2010 09 21 10 02 00 36.7300 126.1300 21.00 16.00 5.00 304049 TAP 2010 08 17 07 33 00 3628-99 G co CCGG 342.090 -999.990 .X. V2 2010 09 21 10 17 00 36.7300 126.1300 21.00 16.00 5.00 304050 TAP 2010 08 17 07 45 00 192-99 G co CCGG 339.170 -999.990 .XC R5 2010 09 20 15 23 00 36.7300 126.1300 21.00 16.00 5.00 304051 TAP 2010 08 17 07 45 00 4745-99 G co CCGG 338.550 -999.990 .XC R5 2010 09 20 15 38 00 36.7300 126.1300 21.00 16.00 5.00 304052 TAP 2010 08 22 07 47 00 1906-99 G co CCGG 125.610 -999.990 ... R5 2010 11 15 12 14 00 36.7300 126.1300 21.00 16.00 5.00 307566 TAP 2010 08 22 07 47 00 735-99 G co CCGG 126.580 -999.990 ... R5 2010 11 15 11 59 00 36.7300 126.1300 21.00 16.00 5.00 307565 TAP 2010 08 22 08 00 00 4661-99 G co CCGG 127.400 -999.990 ... R5 2010 11 15 12 29 00 36.7300 126.1300 21.00 16.00 5.00 307563 TAP 2010 08 22 08 00 00 4694-99 G co CCGG 127.920 -999.990 ... R5 2010 11 15 12 44 00 36.7300 126.1300 21.00 16.00 5.00 307564 TAP 2010 09 16 06 13 00 2834-99 G co CCGG 315.030 -999.990 ..C R5 2010 11 15 12 58 00 36.7300 126.1300 21.00 16.00 5.00 307578 TAP 2010 09 16 06 13 00 3060-99 G co CCGG 313.780 -999.990 ..C R5 2010 11 15 13 13 00 36.7300 126.1300 21.00 16.00 5.00 307579 TAP 2010 09 16 06 28 00 1748-99 G co CCGG 270.620 -999.990 ..C R5 2010 11 15 13 28 00 36.7300 126.1300 21.00 16.00 5.00 307591 TAP 2010 09 16 06 28 00 3447-99 G co CCGG 273.560 -999.990 ..C R5 2010 11 15 13 42 00 36.7300 126.1300 21.00 16.00 5.00 307592 TAP 2010 09 23 07 38 00 2249-99 G co CCGG 161.030 -999.990 ... R5 2010 11 15 13 57 00 36.7300 126.1300 21.00 16.00 5.00 307595 TAP 2010 09 23 07 38 00 4165-99 G co CCGG 160.680 -999.990 ... R5 2010 11 15 14 12 00 36.7300 126.1300 21.00 16.00 5.00 307596 TAP 2010 09 23 07 52 00 4918-99 G co CCGG 162.450 -999.990 ... R5 2010 11 15 14 27 00 36.7300 126.1300 21.00 16.00 5.00 307593 TAP 2010 09 23 07 52 00 5045-99 G co CCGG 162.090 -999.990 ... R5 2010 11 15 14 41 00 36.7300 126.1300 21.00 16.00 5.00 307594 TAP 2010 09 28 05 21 00 3296-99 G co CCGG 145.220 -999.990 ... R5 2010 11 15 11 00 00 36.7300 126.1300 21.00 16.00 5.00 307559 TAP 2010 09 28 05 21 00 4726-99 G co CCGG 144.310 -999.990 ... R5 2010 11 15 11 15 00 36.7300 126.1300 21.00 16.00 5.00 307560 TAP 2010 09 28 05 33 00 3699-99 G co CCGG 141.500 -999.990 ... R5 2010 11 15 11 30 00 36.7300 126.1300 21.00 16.00 5.00 307561 TAP 2010 09 28 05 33 00 4332-99 G co CCGG 141.370 -999.990 ... R5 2010 11 15 11 44 00 36.7300 126.1300 21.00 16.00 5.00 307562 TAP 2010 10 09 06 11 00 1486-99 G co CCGG 258.400 -999.990 ..C R5 2010 12 07 13 15 00 36.7300 126.1300 21.00 16.00 5.00 308533 TAP 2010 10 09 06 11 00 3805-99 G co CCGG 257.190 -999.990 ..C R5 2010 12 07 13 29 00 36.7300 126.1300 21.00 16.00 5.00 308534 TAP 2010 10 09 06 24 00 3976-99 G co CCGG 249.520 -999.990 ..C R5 2010 12 07 12 45 00 36.7300 126.1300 21.00 16.00 5.00 308531 TAP 2010 10 09 06 24 00 4232-99 G co CCGG 250.090 -999.990 ..C R5 2010 12 07 13 00 00 36.7300 126.1300 21.00 16.00 5.00 308532 TAP 2010 10 26 05 55 00 1448-99 G co CCGG 162.140 -999.990 ... R5 2010 12 07 13 49 00 36.7300 126.1300 21.00 16.00 5.00 308537 TAP 2010 10 26 05 55 00 4000-99 G co CCGG 162.870 -999.990 ... R5 2010 12 07 14 04 00 36.7300 126.1300 21.00 16.00 5.00 308538 TAP 2010 10 26 06 08 00 2336-99 G co CCGG 160.670 -999.990 ... R5 2010 12 07 14 18 00 36.7300 126.1300 21.00 16.00 5.00 308535 TAP 2010 10 26 06 08 00 3765-99 G co CCGG 161.820 -999.990 ... R5 2010 12 07 14 33 00 36.7300 126.1300 21.00 16.00 5.00 308536 TAP 2010 11 02 05 58 00 3369-99 G co CCGG 145.120 -999.990 ... V2 2011 01 05 11 51 00 36.7300 126.1300 21.00 16.00 5.00 310279 TAP 2010 11 02 05 58 00 4496-99 G co CCGG 143.710 -999.990 ... V2 2011 01 05 12 07 00 36.7300 126.1300 21.00 16.00 5.00 310280 TAP 2010 11 02 06 14 00 1102-99 G co CCGG 143.610 -999.990 ... V2 2011 01 05 11 18 00 36.7300 126.1300 21.00 16.00 5.00 310277 TAP 2010 11 02 06 14 00 3084-99 G co CCGG 142.590 -999.990 ... V2 2011 01 05 11 35 00 36.7300 126.1300 21.00 16.00 5.00 310278 TAP 2010 11 09 04 05 00 1485-99 G co CCGG 176.750 -999.990 ... R5 2010 12 20 11 02 00 36.7300 126.1300 21.00 16.00 5.00 309417 TAP 2010 11 09 04 05 00 377-99 G co CCGG 177.330 -999.990 ... R5 2010 12 20 10 47 00 36.7300 126.1300 21.00 16.00 5.00 309416 TAP 2010 11 09 06 20 00 2604-99 G co CCGG 178.220 -999.990 ... R5 2010 12 20 11 17 00 36.7300 126.1300 21.00 16.00 5.00 309418 TAP 2010 11 09 06 20 00 4296-99 G co CCGG 178.210 -999.990 ... R5 2010 12 20 11 31 00 36.7300 126.1300 21.00 16.00 5.00 309419 TAP 2010 11 15 07 42 00 1238-99 G co CCGG 158.720 -999.990 ... R5 2010 12 17 14 30 00 36.7300 126.1300 21.00 16.00 5.00 309396 TAP 2010 11 15 07 42 00 4076-99 G co CCGG 158.330 -999.990 ... R5 2010 12 17 14 44 00 36.7300 126.1300 21.00 16.00 5.00 309397 TAP 2010 11 15 07 55 00 1876-99 G co CCGG 157.990 -999.990 ... R5 2010 12 17 14 00 00 36.7300 126.1300 21.00 16.00 5.00 309395 TAP 2010 11 15 07 55 00 2163-99 G co CCGG 157.600 -999.990 ... R5 2010 12 17 14 15 00 36.7300 126.1300 21.00 16.00 5.00 309394 TAP 2010 11 22 05 40 00 2176-99 G co CCGG 174.500 -999.990 ... V2 2010 12 22 13 35 00 36.7300 126.1300 21.00 16.00 5.00 309504 TAP 2010 11 22 05 40 00 967-99 G co CCGG 175.370 -999.990 ... V2 2010 12 22 13 18 00 36.7300 126.1300 21.00 16.00 5.00 309503 TAP 2010 11 22 05 54 00 3373-99 G co CCGG 166.490 -999.990 ... V2 2010 12 22 13 51 00 36.7300 126.1300 21.00 16.00 5.00 309505 TAP 2010 11 22 05 54 00 4603-99 G co CCGG 167.090 -999.990 ... V2 2010 12 22 14 07 00 36.7300 126.1300 21.00 16.00 5.00 309506 TAP 2010 12 03 06 08 00 1778-99 G co CCGG 199.490 -999.990 ... V2 2011 01 05 12 56 00 36.7300 126.1300 21.00 16.00 5.00 310281 TAP 2010 12 03 06 08 00 2534-99 G co CCGG 199.150 -999.990 ... V2 2011 01 05 13 12 00 36.7300 126.1300 21.00 16.00 5.00 310282 TAP 2010 12 03 06 21 00 1756-99 G co CCGG 195.350 -999.990 ... V2 2011 01 05 12 40 00 36.7300 126.1300 21.00 16.00 5.00 310283 TAP 2010 12 03 06 21 00 999-99 G co CCGG 196.130 -999.990 ... V2 2011 01 05 12 23 00 36.7300 126.1300 21.00 16.00 5.00 310284 TAP 2010 12 15 05 09 00 2901-99 G co CCGG 242.220 -999.990 ... V2 2011 02 11 13 50 00 36.7300 126.1300 21.00 16.00 5.00 312198 TAP 2010 12 15 05 09 00 5262-99 G co CCGG 242.600 -999.990 ... V2 2011 02 11 14 06 00 36.7300 126.1300 21.00 16.00 5.00 312199 TAP 2010 12 15 05 25 00 3410-99 G co CCGG 239.240 -999.990 ... V2 2011 02 11 13 17 00 36.7300 126.1300 21.00 16.00 5.00 312196 TAP 2010 12 15 05 25 00 5102-99 G co CCGG 242.270 -999.990 ... V2 2011 02 11 13 34 00 36.7300 126.1300 21.00 16.00 5.00 312197 TAP 2010 12 24 04 33 00 2763-99 G co CCGG 212.380 -999.990 N.. V2 2011 02 17 13 55 00 36.7300 126.1300 21.00 16.00 5.00 312445 TAP 2010 12 24 04 33 00 320-99 G co CCGG 196.040 -999.990 ... V2 2011 02 17 13 38 00 36.7300 126.1300 21.00 16.00 5.00 312444 TAP 2010 12 24 13 47 00 3037-99 G co CCGG 196.940 -999.990 ... V2 2011 02 17 14 11 00 36.7300 126.1300 21.00 16.00 5.00 312447 TAP 2010 12 24 13 47 00 3433-99 G co CCGG 195.710 -999.990 ... V2 2011 02 17 14 27 00 36.7300 126.1300 21.00 16.00 5.00 312446 TAP 2010 12 31 04 42 00 4213-99 G co CCGG 300.590 -999.990 ... V2 2011 03 01 14 15 00 36.7300 126.1300 21.00 16.00 5.00 313069 TAP 2010 12 31 04 42 00 5268-99 G co CCGG 299.040 -999.990 ... V2 2011 03 01 14 31 00 36.7300 126.1300 21.00 16.00 5.00 313070 TAP 2010 12 31 05 08 00 5280-99 G co CCGG 299.600 -999.990 ... V2 2011 03 01 14 48 00 36.7300 126.1300 21.00 16.00 5.00 313071 TAP 2010 12 31 05 08 00 5285-99 G co CCGG 299.750 -999.990 ... V2 2011 03 01 15 04 00 36.7300 126.1300 21.00 16.00 5.00 313072 TAP 2011 01 06 05 50 00 1976-99 G co CCGG 233.250 -999.990 P.. V2 2011 03 01 15 20 00 36.7300 126.1300 21.00 16.00 5.00 313221 TAP 2011 01 06 05 50 00 2084-99 G co CCGG 190.360 -999.990 P.. V2 2011 03 01 15 37 00 36.7300 126.1300 21.00 16.00 5.00 313222 TAP 2011 01 06 06 03 00 3317-99 G co CCGG 188.340 -999.990 ... V2 2011 03 01 15 53 00 36.7300 126.1300 21.00 16.00 5.00 313223 TAP 2011 01 06 06 03 00 4093-99 G co CCGG 186.170 -999.990 ... V2 2011 03 01 16 09 00 36.7300 126.1300 21.00 16.00 5.00 313224 TAP 2011 01 17 07 40 00 481-99 G co CCGG 235.660 -999.990 ... V2 2011 03 01 13 43 00 36.7300 126.1300 21.00 16.00 5.00 313068 TAP 2011 01 17 07 53 00 359-99 G co CCGG 211.820 -999.990 ... V2 2011 03 01 13 10 00 36.7300 126.1300 21.00 16.00 5.00 313066 TAP 2011 01 17 07 53 00 831-99 G co CCGG 213.800 -999.990 ... V2 2011 03 01 13 26 00 36.7300 126.1300 21.00 16.00 5.00 313067 TAP 2011 01 27 05 50 00 4945-99 G co CCGG 182.340 -999.990 ... V2 2011 03 17 16 05 00 36.7300 126.1300 21.00 16.00 5.00 314396 TAP 2011 01 27 05 50 00 4946-99 G co CCGG 182.270 -999.990 ... V2 2011 03 17 16 21 00 36.7300 126.1300 21.00 16.00 5.00 314398 TAP 2011 01 27 06 09 00 5055-99 G co CCGG 184.680 -999.990 ... V2 2011 03 17 15 32 00 36.7300 126.1300 21.00 16.00 5.00 314397 TAP 2011 01 27 06 09 00 5056-99 G co CCGG 186.220 -999.990 ... V2 2011 03 17 15 48 00 36.7300 126.1300 21.00 16.00 5.00 314399 TAP 2011 02 09 05 41 00 3638-99 G co CCGG 197.540 -999.990 ... V2 2011 03 18 11 57 00 36.7300 126.1300 21.00 16.00 5.00 314368 TAP 2011 02 09 05 41 00 4243-99 G co CCGG 197.600 -999.990 ... V2 2011 03 18 12 13 00 36.7300 126.1300 21.00 16.00 5.00 314369 TAP 2011 02 09 05 54 00 3020-99 G co CCGG 197.440 -999.990 ... V2 2011 03 18 11 40 00 36.7300 126.1300 21.00 16.00 5.00 314371 TAP 2011 02 09 05 54 00 950-99 G co CCGG 196.430 -999.990 ... V2 2011 03 18 11 24 00 36.7300 126.1300 21.00 16.00 5.00 314370 TAP 2011 02 15 05 38 00 3171-99 G co CCGG 357.670 -999.990 ... V2 2011 03 18 13 02 00 36.7300 126.1300 21.00 16.00 5.00 314372 TAP 2011 02 15 05 38 00 3172-99 G co CCGG 358.070 -999.990 ... V2 2011 03 18 13 18 00 36.7300 126.1300 21.00 16.00 5.00 314373 TAP 2011 02 15 05 53 00 379-99 G co CCGG 349.760 -999.990 ... V2 2011 03 18 12 29 00 36.7300 126.1300 21.00 16.00 5.00 314374 TAP 2011 02 15 05 53 00 380-99 G co CCGG 348.120 -999.990 ... V2 2011 03 18 12 45 00 36.7300 126.1300 21.00 16.00 5.00 314375 TAP 2011 03 02 04 11 00 4230-99 G co CCGG 256.990 -999.990 ... V4 2011 10 06 15 41 00 36.7300 126.1300 21.00 16.00 5.00 324748 TAP 2011 03 02 04 11 00 4393-99 G co CCGG 256.200 -999.990 ... V4 2011 10 06 15 56 00 36.7300 126.1300 21.00 16.00 5.00 324749 TAP 2011 03 02 04 25 00 274-99 G co CCGG 258.730 -999.990 ... V4 2011 10 07 09 22 00 36.7300 126.1300 21.00 16.00 5.00 324750 TAP 2011 03 02 04 25 00 4238-99 G co CCGG 257.600 -999.990 ... V4 2011 10 07 09 37 00 36.7300 126.1300 21.00 16.00 5.00 324751 TAP 2011 03 07 05 55 00 1755-99 G co CCGG 239.960 -999.990 ... V4 2011 09 21 10 15 00 36.7300 126.1300 21.00 16.00 5.00 323809 TAP 2011 03 07 05 55 00 2991-99 G co CCGG 241.260 -999.990 ... V4 2011 09 21 10 30 00 36.7300 126.1300 21.00 16.00 5.00 323810 TAP 2011 03 07 06 09 00 2282-99 G co CCGG 233.180 -999.990 ... V4 2011 09 21 11 00 00 36.7300 126.1300 21.00 16.00 5.00 323811 TAP 2011 03 07 06 09 00 973-99 G co CCGG 234.450 -999.990 ... V4 2011 09 21 10 45 00 36.7300 126.1300 21.00 16.00 5.00 323812 TAP 2011 03 17 03 53 00 2225-99 G co CCGG 219.560 -999.990 ... V2 2011 06 20 13 49 00 36.7300 126.1300 21.00 16.00 5.00 319359 TAP 2011 03 17 03 53 00 2226-99 G co CCGG 220.100 -999.990 ... V2 2011 06 20 14 05 00 36.7300 126.1300 21.00 16.00 5.00 319360 TAP 2011 03 17 04 19 00 1395-99 G co CCGG 211.130 -999.990 ... V2 2011 06 20 14 23 00 36.7300 126.1300 21.00 16.00 5.00 319361 TAP 2011 03 17 04 19 00 1396-99 G co CCGG 212.350 -999.990 ... V2 2011 06 20 14 39 00 36.7300 126.1300 21.00 16.00 5.00 319362 TAP 2011 03 23 05 17 00 123-99 G co CCGG 234.510 -999.990 ... V4 2011 05 05 11 10 00 36.7300 126.1300 21.00 16.00 5.00 317096 TAP 2011 03 23 05 17 00 124-99 G co CCGG 235.290 -999.990 ... V4 2011 05 05 11 25 00 36.7300 126.1300 21.00 16.00 5.00 317097 TAP 2011 03 23 12 34 56 3635-99 G co CCGG 234.300 -999.990 ... V4 2011 05 05 10 39 00 36.7300 126.1300 21.00 16.00 5.00 317098 TAP 2011 03 23 12 34 56 3636-99 G co CCGG 234.500 -999.990 ... V4 2011 05 05 10 55 00 36.7300 126.1300 21.00 16.00 5.00 317099 TAP 2011 03 29 05 04 00 1500-99 G co CCGG 321.980 -999.990 ... V2 2011 06 02 13 26 00 36.7300 126.1300 21.00 16.00 5.00 318430 TAP 2011 03 29 05 04 00 1837-99 G co CCGG 322.110 -999.990 ... V2 2011 06 02 13 43 00 36.7300 126.1300 21.00 16.00 5.00 318431 TAP 2011 03 29 05 09 00 1596-99 G co CCGG 316.410 -999.990 ... V2 2011 06 02 12 51 00 36.7300 126.1300 21.00 16.00 5.00 318432 TAP 2011 03 29 05 09 00 2717-99 G co CCGG 316.840 -999.990 ... V2 2011 06 02 13 07 00 36.7300 126.1300 21.00 16.00 5.00 318433 TAP 2011 04 04 08 40 00 1218-99 G co CCGG 368.820 -999.990 ... V4 2011 07 15 14 26 00 36.7300 126.1300 21.00 16.00 5.00 320458 TAP 2011 04 04 08 40 00 4104-99 G co CCGG 367.580 -999.990 ... V4 2011 07 15 14 41 00 36.7300 126.1300 21.00 16.00 5.00 320459 TAP 2011 04 04 08 56 00 1727-99 G co CCGG 376.510 -999.990 ... V4 2011 07 15 13 55 00 36.7300 126.1300 21.00 16.00 5.00 320460 TAP 2011 04 04 08 56 00 3621-99 G co CCGG 376.590 -999.990 ... V4 2011 07 15 14 11 00 36.7300 126.1300 21.00 16.00 5.00 320461 TAP 2011 04 11 05 15 00 172-99 G co CCGG 297.880 -999.990 ... V4 2011 06 06 15 37 00 36.7300 126.1300 21.00 16.00 5.00 318398 TAP 2011 04 11 05 29 00 1499-99 G co CCGG 304.110 -999.990 ... V4 2011 06 03 11 05 00 36.7300 126.1300 21.00 16.00 5.00 318399 TAP 2011 04 11 05 29 00 4789-99 G co CCGG 303.750 -999.990 ... V4 2011 06 03 11 21 00 36.7300 126.1300 21.00 16.00 5.00 318400 TAP 2011 04 28 04 44 00 2800-99 G co CCGG 267.470 -999.990 ... V2 2011 06 22 13 34 00 36.7300 126.1300 21.00 16.00 5.00 319544 TAP 2011 04 28 04 44 00 672-99 G co CCGG 266.740 -999.990 ... V2 2011 06 22 13 18 00 36.7300 126.1300 21.00 16.00 5.00 319545 TAP 2011 04 28 04 59 00 1348-99 G co CCGG 270.250 -999.990 ... V2 2011 06 22 12 45 00 36.7300 126.1300 21.00 16.00 5.00 319546 TAP 2011 04 28 04 59 00 3090-99 G co CCGG 268.550 -999.990 ... V2 2011 06 22 13 02 00 36.7300 126.1300 21.00 16.00 5.00 319547 TAP 2011 05 12 08 06 00 1682-99 G co CCGG 603.510 -999.990 .XC V2 2011 06 21 16 09 00 36.7300 126.1300 21.00 16.00 5.00 319525 TAP 2011 05 12 08 06 00 876-99 G co CCGG 602.420 -999.990 .XC V2 2011 06 21 15 53 00 36.7300 126.1300 21.00 16.00 5.00 319524 TAP 2011 05 12 08 21 00 300-99 G co CCGG 554.620 -999.990 .XC V2 2011 06 21 15 21 00 36.7300 126.1300 21.00 16.00 5.00 319526 TAP 2011 05 12 08 21 00 3053-99 G co CCGG 556.020 -999.990 .XC V2 2011 06 21 15 37 00 36.7300 126.1300 21.00 16.00 5.00 319527 TAP 2011 05 27 06 47 00 4110-99 G co CCGG 252.080 -999.990 ... V4 2011 07 06 10 51 00 36.7300 126.1300 21.00 16.00 5.00 320085 TAP 2011 05 27 06 47 00 581-99 G co CCGG 252.070 -999.990 ... V4 2011 07 06 10 36 00 36.7300 126.1300 21.00 16.00 5.00 320084 TAP 2011 05 27 07 08 00 2555-99 G co CCGG 247.310 -999.990 P.. V4 2011 07 06 11 07 00 36.7300 126.1300 21.00 16.00 5.00 320082 TAP 2011 05 27 07 08 00 4561-99 G co CCGG 243.370 -999.990 P.. V4 2011 07 06 11 22 00 36.7300 126.1300 21.00 16.00 5.00 320083 TAP 2011 06 11 08 38 00 4311-99 G co CCGG 299.120 -999.990 P.. V4 2011 09 19 14 41 00 36.7300 126.1300 21.00 16.00 5.00 323800 TAP 2011 06 11 08 38 00 4312-99 G co CCGG 302.650 -999.990 P.. V4 2011 09 19 14 56 00 36.7300 126.1300 21.00 16.00 5.00 323801 TAP 2011 06 11 08 51 00 643-99 G co CCGG 358.230 -999.990 P.. V4 2011 09 19 15 11 00 36.7300 126.1300 21.00 16.00 5.00 323798 TAP 2011 06 11 08 51 00 644-99 G co CCGG 328.100 -999.990 P.. V4 2011 09 19 15 26 00 36.7300 126.1300 21.00 16.00 5.00 323799 TAP 2011 06 16 07 19 00 4089-99 G co CCGG 307.640 -999.990 ... V2 2011 08 12 09 34 00 36.7300 126.1300 21.00 16.00 5.00 322072 TAP 2011 06 16 07 19 00 4090-99 G co CCGG 308.390 -999.990 ... V2 2011 08 12 09 51 00 36.7300 126.1300 21.00 16.00 5.00 322073 TAP 2011 06 16 07 26 00 3371-99 G co CCGG 307.540 -999.990 ... V2 2011 08 12 10 07 00 36.7300 126.1300 21.00 16.00 5.00 322070 TAP 2011 06 16 07 26 00 3372-99 G co CCGG 305.380 -999.990 ... V2 2011 08 12 10 23 00 36.7300 126.1300 21.00 16.00 5.00 322071 TAP 2011 07 04 05 30 00 4923-99 G co CCGG 245.650 -999.990 ... V4 2011 09 19 13 48 00 36.7300 126.1300 21.00 16.00 5.00 323794 TAP 2011 07 04 05 30 00 4924-99 G co CCGG 245.660 -999.990 ... V4 2011 09 19 14 03 00 36.7300 126.1300 21.00 16.00 5.00 323795 TAP 2011 07 04 07 45 00 3215-99 G co CCGG 241.050 -999.990 ... V4 2011 09 19 13 17 00 36.7300 126.1300 21.00 16.00 5.00 323797 TAP 2011 07 04 07 45 00 3216-99 G co CCGG 241.240 -999.990 ... V4 2011 09 19 13 33 00 36.7300 126.1300 21.00 16.00 5.00 323796 TAP 2011 07 18 06 59 00 1744-99 G co CCGG 180.740 -999.990 ... V4 2011 10 05 11 29 00 36.7300 126.1300 21.00 16.00 5.00 324393 TAP 2011 07 18 06 59 00 4074-99 G co CCGG 181.600 -999.990 ... V4 2011 10 05 11 45 00 36.7300 126.1300 21.00 16.00 5.00 324394 TAP 2011 07 18 07 11 00 1410-99 G co CCGG 197.530 -999.990 ... V4 2011 10 03 13 20 00 36.7300 126.1300 21.00 16.00 5.00 324395 TAP 2011 07 18 07 11 00 2960-99 G co CCGG 197.580 -999.990 ... V4 2011 10 03 13 35 00 36.7300 126.1300 21.00 16.00 5.00 324396 TAP 2011 07 25 08 30 00 2451-99 G co CCGG 140.990 -999.990 ... V4 2011 11 07 16 28 00 36.7300 126.1300 21.00 16.00 5.00 326214 TAP 2011 07 25 08 30 00 2452-99 G co CCGG 140.930 -999.990 ... V4 2011 11 07 16 43 00 36.7300 126.1300 21.00 16.00 5.00 326215 TAP 2011 07 25 08 44 00 1829-99 G co CCGG 149.660 -999.990 ... V4 2011 11 07 16 59 00 36.7300 126.1300 21.00 16.00 5.00 326212 TAP 2011 07 25 08 44 00 1830-99 G co CCGG 149.300 -999.990 ... V4 2011 11 07 17 14 00 36.7300 126.1300 21.00 16.00 5.00 326213 TAP 2011 08 09 07 24 00 2527-99 G co CCGG 138.790 -999.990 P.. V4 2011 11 07 10 53 00 36.7300 126.1300 21.00 16.00 5.00 326258 TAP 2011 08 09 07 24 00 2528-99 G co CCGG 171.750 -999.990 P.. V4 2011 11 07 11 08 00 36.7300 126.1300 21.00 16.00 5.00 326259 TAP 2011 08 09 07 38 00 1161-99 G co CCGG 148.740 -999.990 ... V4 2011 11 07 11 23 00 36.7300 126.1300 21.00 16.00 5.00 326256 TAP 2011 08 09 07 38 00 1162-99 G co CCGG 144.430 -999.990 ... V4 2011 11 07 11 38 00 36.7300 126.1300 21.00 16.00 5.00 326257 TAP 2011 08 22 07 10 00 1325-99 G co CCGG 232.180 -999.990 P.. V4 2011 09 30 14 11 00 36.7300 126.1300 21.00 16.00 5.00 324385 TAP 2011 08 22 07 10 00 3165-99 G co CCGG 245.930 -999.990 P.. V4 2011 09 30 14 26 00 36.7300 126.1300 21.00 16.00 5.00 324386 TAP 2011 08 22 07 24 00 2074-99 G co CCGG 215.750 -999.990 P.. V4 2011 09 30 14 42 00 36.7300 126.1300 21.00 16.00 5.00 324387 TAP 2011 08 22 07 24 00 3581-99 G co CCGG 219.610 -999.990 P.. V4 2011 09 30 14 57 00 36.7300 126.1300 21.00 16.00 5.00 324388 TAP 2011 08 29 08 00 00 4011-99 G co CCGG 121.350 -999.990 ... V4 2011 11 08 11 53 00 36.7300 126.1300 21.00 16.00 5.00 326218 TAP 2011 08 29 08 00 00 4012-99 G co CCGG 120.930 -999.990 ... V4 2011 11 08 12 08 00 36.7300 126.1300 21.00 16.00 5.00 326219 TAP 2011 08 29 08 15 00 3601-99 G co CCGG 127.240 -999.990 ... V4 2011 11 08 12 24 00 36.7300 126.1300 21.00 16.00 5.00 326216 TAP 2011 08 29 08 15 00 3602-99 G co CCGG 128.020 -999.990 ... V4 2011 11 08 12 39 00 36.7300 126.1300 21.00 16.00 5.00 326217 TAP 2011 09 18 05 47 00 1786-99 G co CCGG 199.790 -999.990 ... V4 2011 11 14 14 20 00 36.7300 126.1300 21.00 16.00 5.00 326581 TAP 2011 09 18 05 47 00 412-99 G co CCGG 199.720 -999.990 ... V4 2011 11 14 14 05 00 36.7300 126.1300 21.00 16.00 5.00 326580 TAP 2011 09 18 05 59 00 2139-99 G co CCGG 198.970 -999.990 ... V4 2011 11 14 13 34 00 36.7300 126.1300 21.00 16.00 5.00 326578 TAP 2011 09 18 05 59 00 3183-99 G co CCGG 198.720 -999.990 ... V4 2011 11 14 13 49 00 36.7300 126.1300 21.00 16.00 5.00 326579 TAP 2011 09 21 08 30 00 3801-99 G co CCGG 131.250 -999.990 ... V4 2011 11 28 11 43 00 36.7300 126.1300 21.00 16.00 5.00 326986 TAP 2011 09 21 08 30 00 3802-99 G co CCGG 129.170 -999.990 ... V4 2011 11 28 11 59 00 36.7300 126.1300 21.00 16.00 5.00 326987 TAP 2011 09 21 08 45 00 3707-99 G co CCGG 130.710 -999.990 ... V4 2011 11 28 12 16 00 36.7300 126.1300 21.00 16.00 5.00 326988 TAP 2011 09 21 08 45 00 3708-99 G co CCGG 130.570 -999.990 ... V4 2011 11 28 12 31 00 36.7300 126.1300 21.00 16.00 5.00 326989 TAP 2011 09 26 07 44 00 1217-99 G co CCGG 404.360 -999.990 .X. V4 2011 11 11 16 16 00 36.7300 126.1300 21.00 16.00 5.00 326509 TAP 2011 09 26 07 44 00 4296-99 G co CCGG 403.710 -999.990 .X. V4 2011 11 11 16 31 00 36.7300 126.1300 21.00 16.00 5.00 326508 TAP 2011 09 26 07 58 00 1432-99 G co CCGG 383.550 -999.990 ... V4 2011 11 11 16 46 00 36.7300 126.1300 21.00 16.00 5.00 326510 TAP 2011 09 26 07 58 00 4832-99 G co CCGG 382.450 -999.990 ... V4 2011 11 11 17 02 00 36.7300 126.1300 21.00 16.00 5.00 326511 TAP 2011 10 07 07 42 00 773-99 G co CCGG 378.130 -999.990 ... V4 2011 11 11 17 47 00 36.7300 126.1300 21.00 16.00 5.00 326512 TAP 2011 10 07 07 42 00 774-99 G co CCGG 377.740 -999.990 ... V4 2011 11 11 18 03 00 36.7300 126.1300 21.00 16.00 5.00 326513 TAP 2011 10 07 07 57 00 5025-99 G co CCGG 376.370 -999.990 ... V4 2011 11 11 17 17 00 36.7300 126.1300 21.00 16.00 5.00 326514 TAP 2011 10 07 07 57 00 5026-99 G co CCGG 376.400 -999.990 ... V4 2011 11 11 17 32 00 36.7300 126.1300 21.00 16.00 5.00 326515 TAP 2011 10 16 06 29 00 1537-99 G co CCGG 330.500 -999.990 ... V2 2012 01 24 11 02 00 36.7300 126.1300 21.00 16.00 5.00 329676 TAP 2011 10 16 06 29 00 2563-99 G co CCGG 328.720 -999.990 ... V2 2012 01 24 11 18 00 36.7300 126.1300 21.00 16.00 5.00 329677 TAP 2011 10 16 06 44 00 646-99 G co CCGG 314.970 -999.990 ... V2 2012 01 24 10 30 00 36.7300 126.1300 21.00 16.00 5.00 329674 TAP 2011 10 16 06 44 00 798-99 G co CCGG 316.830 -999.990 ... V2 2012 01 24 10 46 00 36.7300 126.1300 21.00 16.00 5.00 329675 TAP 2011 10 18 06 50 00 1049-99 G co CCGG 180.520 -999.990 ... V4 2011 11 17 10 01 00 36.7300 126.1300 21.00 16.00 5.00 326695 TAP 2011 10 18 06 50 00 1050-99 G co CCGG 180.370 -999.990 ... V4 2011 11 17 10 16 00 36.7300 126.1300 21.00 16.00 5.00 326696 TAP 2011 10 18 07 04 00 2619-99 G co CCGG 178.590 -999.990 ... V4 2011 11 17 09 31 00 36.7300 126.1300 21.00 16.00 5.00 326693 TAP 2011 10 18 07 04 00 2620-99 G co CCGG 178.480 -999.990 ... V4 2011 11 17 09 46 00 36.7300 126.1300 21.00 16.00 5.00 326694 TAP 2011 10 25 04 47 00 4389-99 G co CCGG 131.510 -999.990 ... V4 2011 12 22 13 15 00 36.7300 126.1300 21.00 16.00 5.00 328100 TAP 2011 10 25 04 47 00 4390-99 G co CCGG 131.670 -999.990 ... V4 2011 12 22 13 31 00 36.7300 126.1300 21.00 16.00 5.00 328101 TAP 2011 10 25 05 00 00 4505-99 G co CCGG 131.180 -999.990 ... V2 2011 12 21 14 04 00 36.7300 126.1300 21.00 16.00 5.00 328102 TAP 2011 10 25 05 00 00 4506-99 G co CCGG 130.440 -999.990 ... V2 2011 12 21 14 21 00 36.7300 126.1300 21.00 16.00 5.00 328103 TAP 2011 10 30 05 50 00 1661-99 G co CCGG 347.450 -999.990 ... V2 2011 12 21 12 59 00 36.7300 126.1300 21.00 16.00 5.00 328098 TAP 2011 10 30 05 50 00 1662-99 G co CCGG 348.640 -999.990 ... V2 2011 12 21 13 16 00 36.7300 126.1300 21.00 16.00 5.00 328099 TAP 2011 10 30 06 04 00 1737-99 G co CCGG 345.190 -999.990 ... V2 2011 12 21 13 32 00 36.7300 126.1300 21.00 16.00 5.00 328097 TAP 2011 10 30 06 04 00 1738-99 G co CCGG 345.580 -999.990 ... V2 2011 12 21 13 48 00 36.7300 126.1300 21.00 16.00 5.00 328096 TAP 2011 11 15 05 15 00 1605-99 G co CCGG 266.590 -999.990 ... V4 2011 12 21 13 41 00 36.7300 126.1300 21.00 16.00 5.00 328115 TAP 2011 11 15 05 15 00 1606-99 G co CCGG 266.790 -999.990 ... V4 2011 12 21 13 57 00 36.7300 126.1300 21.00 16.00 5.00 328116 TAP 2011 11 15 05 29 00 1179-99 G co CCGG 269.700 -999.990 ... V4 2011 12 21 13 11 00 36.7300 126.1300 21.00 16.00 5.00 328117 TAP 2011 11 15 05 29 00 1180-99 G co CCGG 268.470 -999.990 ... V4 2011 12 21 13 26 00 36.7300 126.1300 21.00 16.00 5.00 328118 TAP 2011 11 20 05 44 00 3044-99 G co CCGG 173.980 -999.990 ... V2 2011 12 23 09 21 00 36.7300 126.1300 21.00 16.00 5.00 328133 TAP 2011 11 20 05 44 00 4102-99 G co CCGG 174.530 -999.990 ... V2 2011 12 23 09 37 00 36.7300 126.1300 21.00 16.00 5.00 328134 TAP 2011 11 20 05 59 00 1976-99 G co CCGG 173.130 -999.990 ... V2 2011 12 23 10 10 00 36.7300 126.1300 21.00 16.00 5.00 328136 TAP 2011 11 20 05 59 00 4488-99 G co CCGG 174.810 -999.990 ... V2 2011 12 23 09 53 00 36.7300 126.1300 21.00 16.00 5.00 328135 TAP 2011 11 24 04 57 00 3851-99 G co CCGG 150.360 -999.990 ... V4 2011 12 28 14 02 00 36.7300 126.1300 21.00 16.00 5.00 328243 TAP 2011 11 24 04 57 00 3878-99 G co CCGG 149.620 -999.990 ... V4 2011 12 28 14 18 00 36.7300 126.1300 21.00 16.00 5.00 328244 TAP 2011 11 24 05 12 00 1629-99 G co CCGG 150.800 -999.990 ... V4 2011 12 28 13 32 00 36.7300 126.1300 21.00 16.00 5.00 328245 TAP 2011 11 24 05 12 00 5288-99 G co CCGG 151.160 -999.990 ... V4 2011 12 28 13 47 00 36.7300 126.1300 21.00 16.00 5.00 328246 TAP 2011 12 04 07 08 00 3585-99 G co CCGG 176.910 -999.990 +.. V2 2012 01 24 11 35 00 36.7300 126.1300 21.00 16.00 5.00 329680 TAP 2011 12 04 07 08 00 3586-99 G co CCGG 164.030 -999.990 -.. V2 2012 01 24 11 51 00 36.7300 126.1300 21.00 16.00 5.00 329681 TAP 2011 12 04 07 23 00 175-99 G co CCGG 172.960 -999.990 +.. V2 2012 01 24 12 08 00 36.7300 126.1300 21.00 16.00 5.00 329678 TAP 2011 12 04 07 23 00 176-99 G co CCGG 169.340 -999.990 -.. V2 2012 01 24 12 24 00 36.7300 126.1300 21.00 16.00 5.00 329679 TAP 2011 12 09 05 18 00 3331-99 G co CCGG 302.580 -999.990 ... V2 2012 01 23 13 08 00 36.7300 126.1300 21.00 16.00 5.00 329694 TAP 2011 12 09 05 18 00 3332-99 G co CCGG 304.110 -999.990 ... V2 2012 01 23 13 24 00 36.7300 126.1300 21.00 16.00 5.00 329695 TAP 2011 12 09 05 31 00 3289-99 G co CCGG 300.000 -999.990 ... V2 2012 01 23 13 41 00 36.7300 126.1300 21.00 16.00 5.00 329690 TAP 2011 12 09 05 31 00 3290-99 G co CCGG 297.820 -999.990 ... V2 2012 01 23 13 57 00 36.7300 126.1300 21.00 16.00 5.00 329691 TAP 2011 12 15 04 31 00 2025-99 G co CCGG 187.280 -999.990 ... V2 2012 01 26 10 49 00 36.7300 126.1300 21.00 16.00 5.00 330098 TAP 2011 12 15 04 31 00 2026-99 G co CCGG 186.010 -999.990 ... V2 2012 01 26 11 05 00 36.7300 126.1300 21.00 16.00 5.00 330097 TAP 2011 12 15 04 44 00 2429-99 G co CCGG 188.090 -999.990 ... V2 2012 01 26 11 22 00 36.7300 126.1300 21.00 16.00 5.00 330099 TAP 2011 12 15 04 44 00 2430-99 G co CCGG 187.360 -999.990 ... V2 2012 01 26 11 38 00 36.7300 126.1300 21.00 16.00 5.00 330100 TAP 2011 12 22 05 57 00 329-99 G co CCGG 194.990 -999.990 ... V2 2012 01 26 11 54 00 36.7300 126.1300 21.00 16.00 5.00 330101 TAP 2011 12 22 05 57 00 330-99 G co CCGG 196.480 -999.990 ... V2 2012 01 26 12 10 00 36.7300 126.1300 21.00 16.00 5.00 330102 TAP 2011 12 22 06 09 00 3477-99 G co CCGG 193.710 -999.990 ... V2 2012 01 26 12 28 00 36.7300 126.1300 21.00 16.00 5.00 330103 TAP 2011 12 22 06 09 00 3478-99 G co CCGG 195.400 -999.990 ... V2 2012 01 26 12 44 00 36.7300 126.1300 21.00 16.00 5.00 330104 TAP 2011 12 26 05 30 00 4157-99 G co CCGG 174.920 -999.990 ... V4 2012 01 31 09 55 00 36.7300 126.1300 21.00 16.00 5.00 330255 TAP 2011 12 26 05 30 00 4158-99 G co CCGG 175.830 -999.990 ... V4 2012 01 31 10 10 00 36.7300 126.1300 21.00 16.00 5.00 330256 TAP 2011 12 26 05 44 00 3759-99 G co CCGG 174.360 -999.990 ... V4 2012 01 31 09 25 00 36.7300 126.1300 21.00 16.00 5.00 330257 TAP 2011 12 26 05 44 00 3760-99 G co CCGG 174.340 -999.990 ... V4 2012 01 31 09 40 00 36.7300 126.1300 21.00 16.00 5.00 330258 TAP 2012 01 05 05 40 00 3813-99 G co CCGG 229.180 -999.990 ... V4 2012 03 01 12 05 00 36.7300 126.1300 21.00 16.00 5.00 331804 TAP 2012 01 05 05 40 00 3814-99 G co CCGG 228.530 -999.990 ... V4 2012 03 01 12 20 00 36.7300 126.1300 21.00 16.00 5.00 331805 TAP 2012 01 05 05 55 00 635-99 G co CCGG 216.460 -999.990 ... V4 2012 03 01 11 35 00 36.7300 126.1300 21.00 16.00 5.00 331802 TAP 2012 01 05 05 55 00 636-99 G co CCGG 219.230 -999.990 ... V4 2012 03 01 11 50 00 36.7300 126.1300 21.00 16.00 5.00 331803 TAP 2012 01 12 06 50 00 2839-99 G co CCGG 232.580 -999.990 ... V4 2012 02 24 11 19 00 36.7300 126.1300 21.00 16.00 5.00 331788 TAP 2012 01 12 06 50 00 2840-99 G co CCGG 232.960 -999.990 ... V4 2012 02 24 11 35 00 36.7300 126.1300 21.00 16.00 5.00 331789 TAP 2012 01 12 07 04 00 3617-99 G co CCGG 234.970 -999.990 ... V4 2012 02 24 12 37 00 36.7300 126.1300 21.00 16.00 5.00 331786 TAP 2012 01 12 07 04 00 3618-99 G co CCGG 235.830 -999.990 ... V4 2012 02 24 12 21 00 36.7300 126.1300 21.00 16.00 5.00 331787 TAP 2012 01 22 03 51 00 2743-99 G co CCGG 161.590 -999.990 -.. V4 2012 03 20 15 44 00 36.7300 126.1300 21.00 16.00 5.00 332795 TAP 2012 01 22 03 51 00 42-99 G co CCGG 165.950 -999.990 +.. V4 2012 03 20 15 29 00 36.7300 126.1300 21.00 16.00 5.00 332794 TAP 2012 01 22 04 05 00 1276-99 G co CCGG 164.280 -999.990 ... V4 2012 03 20 16 15 00 36.7300 126.1300 21.00 16.00 5.00 332797 TAP 2012 01 22 04 05 00 424-99 G co CCGG 166.680 -999.990 ... V4 2012 03 20 15 59 00 36.7300 126.1300 21.00 16.00 5.00 332796 TAP 2012 01 30 07 22 00 543-99 G co CCGG 169.600 -999.990 ... V4 2012 03 21 10 01 00 36.7300 126.1300 21.00 16.00 5.00 332800 TAP 2012 01 30 07 22 00 544-99 G co CCGG 168.880 -999.990 ... V4 2012 03 21 10 16 00 36.7300 126.1300 21.00 16.00 5.00 332801 TAP 2012 01 30 07 35 00 1793-99 G co CCGG 171.030 -999.990 ... V4 2012 03 21 09 30 00 36.7300 126.1300 21.00 16.00 5.00 332798 TAP 2012 01 30 07 35 00 1794-99 G co CCGG 170.140 -999.990 ... V4 2012 03 21 09 46 00 36.7300 126.1300 21.00 16.00 5.00 332799 TAP 2012 02 07 04 16 00 1327-99 G co CCGG 118.390 -999.990 -.. V4 2012 03 22 15 24 00 36.7300 126.1300 21.00 16.00 5.00 333047 TAP 2012 02 07 04 16 00 701-99 G co CCGG 182.190 -999.990 +.. V4 2012 03 22 15 09 00 36.7300 126.1300 21.00 16.00 5.00 333046 TAP 2012 02 07 04 29 00 3424-99 G co CCGG 181.890 -999.990 ... V4 2012 03 22 14 38 00 36.7300 126.1300 21.00 16.00 5.00 333044 TAP 2012 02 07 04 29 00 4929-99 G co CCGG 179.660 -999.990 ... V4 2012 03 22 14 54 00 36.7300 126.1300 21.00 16.00 5.00 333045 TAP 2012 02 16 06 16 00 1797-99 G co CCGG 498.240 -999.990 .X. V4 2012 03 22 15 39 00 36.7300 126.1300 21.00 16.00 5.00 333048 TAP 2012 02 16 06 16 00 1798-99 G co CCGG 498.590 -999.990 .X. V4 2012 03 22 15 55 00 36.7300 126.1300 21.00 16.00 5.00 333049 TAP 2012 02 16 06 31 00 525-99 G co CCGG 508.370 -999.990 .X. V4 2012 03 22 16 10 00 36.7300 126.1300 21.00 16.00 5.00 333050 TAP 2012 02 16 06 31 00 526-99 G co CCGG 510.720 -999.990 .X. V4 2012 03 22 16 25 00 36.7300 126.1300 21.00 16.00 5.00 333051 TAP 2012 02 29 04 59 00 4475-99 G co CCGG 312.220 -999.990 ... V4 2012 04 18 10 07 00 36.7300 126.1300 21.00 16.00 5.00 333934 TAP 2012 02 29 04 59 00 4476-99 G co CCGG 313.220 -999.990 ... V4 2012 04 18 10 23 00 36.7300 126.1300 21.00 16.00 5.00 333935 TAP 2012 02 29 05 12 00 1909-99 G co CCGG 354.200 -999.990 +.. V4 2012 04 18 10 38 00 36.7300 126.1300 21.00 16.00 5.00 333936 TAP 2012 02 29 05 12 00 1910-99 G co CCGG 349.770 -999.990 -.. V4 2012 04 18 10 53 00 36.7300 126.1300 21.00 16.00 5.00 333937 TAP 2012 03 07 05 39 00 2415-99 G co CCGG 380.740 -999.990 ... V4 2012 04 18 11 08 00 36.7300 126.1300 21.00 16.00 5.00 333938 TAP 2012 03 07 05 39 00 2416-99 G co CCGG 382.190 -999.990 ... V4 2012 04 18 11 24 00 36.7300 126.1300 21.00 16.00 5.00 333939 TAP 2012 03 07 12 34 56 1167-99 G co CCGG 383.940 -999.990 +.. V4 2012 04 18 11 39 00 36.7300 126.1300 21.00 16.00 5.00 333940 TAP 2012 03 07 12 34 56 1168-99 G co CCGG 375.660 -999.990 -.. V4 2012 04 18 11 54 00 36.7300 126.1300 21.00 16.00 5.00 333941 TAP 2012 03 17 07 11 00 2921-99 G co CCGG 437.510 -999.990 .X. V4 2012 04 24 15 56 00 36.7300 126.1300 21.00 16.00 5.00 334330 TAP 2012 03 17 07 11 00 98-99 G co CCGG 434.990 -999.990 .X. V4 2012 04 24 15 41 00 36.7300 126.1300 21.00 16.00 5.00 334329 TAP 2012 03 17 07 26 00 2073-99 G co CCGG 451.250 -999.990 +.. V4 2012 04 24 15 10 00 36.7300 126.1300 21.00 16.00 5.00 334331 TAP 2012 03 17 07 26 00 3844-99 G co CCGG 441.010 -999.990 -.. V4 2012 04 24 15 25 00 36.7300 126.1300 21.00 16.00 5.00 334332 TAP 2012 03 24 04 51 00 2545-99 G co CCGG 269.520 -999.990 ... V4 2012 05 18 14 06 00 36.7300 126.1300 21.00 16.00 5.00 335326 TAP 2012 03 24 04 51 00 4700-99 G co CCGG 272.570 -999.990 ... V4 2012 05 18 14 21 00 36.7300 126.1300 21.00 16.00 5.00 335327 TAP 2012 03 24 05 06 00 4370-99 G co CCGG 265.050 -999.990 ... V4 2012 05 18 13 35 00 36.7300 126.1300 21.00 16.00 5.00 335324 TAP 2012 03 24 05 06 00 4832-99 G co CCGG 265.550 -999.990 ... V4 2012 05 18 13 51 00 36.7300 126.1300 21.00 16.00 5.00 335325 TAP 2012 04 01 05 35 00 2961-99 G co CCGG 197.790 -999.990 ... V4 2012 05 18 12 34 00 36.7300 126.1300 21.00 16.00 5.00 335322 TAP 2012 04 01 05 35 00 2962-99 G co CCGG 197.920 -999.990 ... V4 2012 05 18 12 50 00 36.7300 126.1300 21.00 16.00 5.00 335323 TAP 2012 04 01 05 48 00 4113-99 G co CCGG 190.150 -999.990 ... V4 2012 05 18 13 05 00 36.7300 126.1300 21.00 16.00 5.00 335320 TAP 2012 04 01 05 48 00 4114-99 G co CCGG 191.010 -999.990 ... V4 2012 05 18 13 20 00 36.7300 126.1300 21.00 16.00 5.00 335321 TAP 2012 04 05 07 09 00 3443-99 G co CCGG 219.880 -999.990 ... V2 2012 05 21 13 13 00 36.7300 126.1300 21.00 16.00 5.00 335328 TAP 2012 04 05 07 09 00 3444-99 G co CCGG 219.750 -999.990 ... V2 2012 05 21 13 30 00 36.7300 126.1300 21.00 16.00 5.00 335329 TAP 2012 04 05 07 24 00 5315-99 G co CCGG 217.680 -999.990 ... V2 2012 05 21 12 09 00 36.7300 126.1300 21.00 16.00 5.00 335330 TAP 2012 04 05 07 24 00 5316-99 G co CCGG 218.610 -999.990 ... V2 2012 05 21 12 25 00 36.7300 126.1300 21.00 16.00 5.00 335331 TAP 2012 04 15 07 13 00 1483-99 G co CCGG 172.460 -999.990 -.. V4 2012 06 07 16 28 00 36.7300 126.1300 21.00 16.00 5.00 336684 TAP 2012 04 15 07 13 00 477-99 G co CCGG 224.280 -999.990 +.. V4 2012 06 07 16 13 00 36.7300 126.1300 21.00 16.00 5.00 336683 TAP 2012 04 15 07 27 00 2944-99 G co CCGG 210.310 -999.990 ... V4 2012 06 12 11 19 00 36.7300 126.1300 21.00 16.00 5.00 336685 TAP 2012 04 15 07 27 00 4722-99 G co CCGG 207.650 -999.990 ... V4 2012 06 12 11 34 00 36.7300 126.1300 21.00 16.00 5.00 336686 TAP 2012 04 26 06 35 00 1347-99 G co CCGG 185.840 -999.990 ... V4 2012 06 13 15 22 00 36.7300 126.1300 21.00 16.00 5.00 336726 TAP 2012 04 26 06 35 00 3258-99 G co CCGG 187.150 -999.990 ... V4 2012 06 13 15 37 00 36.7300 126.1300 21.00 16.00 5.00 336727 TAP 2012 04 26 06 48 00 1069-99 G co CCGG 188.280 -999.990 ... V4 2012 06 13 14 51 00 36.7300 126.1300 21.00 16.00 5.00 336724 TAP 2012 04 26 06 48 00 2395-99 G co CCGG 187.320 -999.990 ... V4 2012 06 13 15 06 00 36.7300 126.1300 21.00 16.00 5.00 336725 TAP 2012 05 03 04 20 00 2446-99 G co CCGG 378.620 -999.990 ... V4 2012 06 14 10 02 00 36.7300 126.1300 21.00 16.00 5.00 336723 TAP 2012 05 03 04 20 00 3967-99 G co CCGG 379.770 -999.990 ... V4 2012 06 14 09 47 00 36.7300 126.1300 21.00 16.00 5.00 336722 TAP 2012 05 03 04 35 00 1779-99 G co CCGG 364.190 -999.990 ... V4 2012 06 13 16 07 00 36.7300 126.1300 21.00 16.00 5.00 336721 TAP 2012 05 03 04 35 00 764-99 G co CCGG 366.660 -999.990 ... V4 2012 06 13 15 52 00 36.7300 126.1300 21.00 16.00 5.00 336720 TAP 2012 05 15 05 35 00 3911-99 G co CCGG 235.350 -999.990 ... V4 2012 07 12 15 18 00 36.7300 126.1300 21.00 16.00 5.00 338030 TAP 2012 05 15 05 35 00 3912-99 G co CCGG 236.750 -999.990 ... V4 2012 07 12 15 33 00 36.7300 126.1300 21.00 16.00 5.00 338031 TAP 2012 05 15 05 50 00 17-99 G co CCGG 235.080 -999.990 ... V4 2012 07 12 14 48 00 36.7300 126.1300 21.00 16.00 5.00 338032 TAP 2012 05 15 05 50 00 18-99 G co CCGG 234.820 -999.990 ... V4 2012 07 12 15 03 00 36.7300 126.1300 21.00 16.00 5.00 338033 TAP 2012 05 20 03 54 00 4754-99 G co CCGG 265.480 -999.990 ... V4 2012 07 12 16 50 00 36.7300 126.1300 21.00 16.00 5.00 338028 TAP 2012 05 20 03 54 00 4958-99 G co CCGG 264.930 -999.990 ... V4 2012 07 12 17 05 00 36.7300 126.1300 21.00 16.00 5.00 338029 TAP 2012 05 20 04 09 00 4220-99 G co CCGG 264.400 -999.990 ... V4 2012 07 13 10 44 00 36.7300 126.1300 21.00 16.00 5.00 338024 TAP 2012 05 20 04 09 00 5280-99 G co CCGG 263.710 -999.990 ... V4 2012 07 13 10 59 00 36.7300 126.1300 21.00 16.00 5.00 338025 TAP 2012 05 25 04 29 00 1131-99 G co CCGG 225.980 -999.990 ... V4 2012 07 12 16 34 00 36.7300 126.1300 21.00 16.00 5.00 338035 TAP 2012 05 25 04 29 00 231-99 G co CCGG 225.990 -999.990 ... V4 2012 07 12 16 19 00 36.7300 126.1300 21.00 16.00 5.00 338034 TAP 2012 05 25 04 56 00 2960-99 G co CCGG 225.040 -999.990 ... V4 2012 07 12 16 04 00 36.7300 126.1300 21.00 16.00 5.00 338037 TAP 2012 05 25 04 56 00 738-99 G co CCGG 224.690 -999.990 ... V4 2012 07 12 15 49 00 36.7300 126.1300 21.00 16.00 5.00 338036 TAP 2012 06 04 08 19 00 2091-99 G co CCGG 201.140 -999.990 ... V4 2012 07 13 13 17 00 36.7300 126.1300 21.00 16.00 5.00 338107 TAP 2012 06 04 08 19 00 2092-99 G co CCGG 201.530 -999.990 ... V4 2012 07 13 13 32 00 36.7300 126.1300 21.00 16.00 5.00 338108 TAP 2012 06 04 08 35 00 2775-99 G co CCGG 203.080 -999.990 ... V4 2012 07 13 13 47 00 36.7300 126.1300 21.00 16.00 5.00 338105 TAP 2012 06 04 08 35 00 2776-99 G co CCGG 203.130 -999.990 ... V4 2012 07 13 14 03 00 36.7300 126.1300 21.00 16.00 5.00 338106 TAP 2012 06 09 08 53 00 5379-99 G co CCGG 144.980 -999.990 ... V4 2012 07 13 12 16 00 36.7300 126.1300 21.00 16.00 5.00 338101 TAP 2012 06 09 08 53 00 5380-99 G co CCGG 144.760 -999.990 ... V4 2012 07 13 12 31 00 36.7300 126.1300 21.00 16.00 5.00 338102 TAP 2012 06 09 09 09 00 1201-99 G co CCGG 144.230 -999.990 ... V4 2012 07 13 12 46 00 36.7300 126.1300 21.00 16.00 5.00 338103 TAP 2012 06 09 09 09 00 1202-99 G co CCGG 145.510 -999.990 ... V4 2012 07 13 13 02 00 36.7300 126.1300 21.00 16.00 5.00 338104 TAP 2012 06 15 08 07 00 283-99 G co CCGG 232.140 -999.990 +.. V4 2012 08 08 12 50 00 36.7300 126.1300 21.00 16.00 5.00 338997 TAP 2012 06 15 08 07 00 2973-99 G co CCGG 225.020 -999.990 -.. V4 2012 08 08 13 05 00 36.7300 126.1300 21.00 16.00 5.00 338998 TAP 2012 06 15 08 22 00 1476-99 G co CCGG 255.700 -999.990 ... V4 2012 08 08 12 19 00 36.7300 126.1300 21.00 16.00 5.00 338999 TAP 2012 06 15 08 22 00 5119-99 G co CCGG 257.120 -999.990 ... V4 2012 08 08 12 35 00 36.7300 126.1300 21.00 16.00 5.00 339000 TAP 2012 06 20 08 13 00 3413-99 G co CCGG 202.510 -999.990 ... V4 2012 08 08 11 18 00 36.7300 126.1300 21.00 16.00 5.00 338993 TAP 2012 06 20 08 13 00 3414-99 G co CCGG 202.340 -999.990 ... V4 2012 08 08 11 34 00 36.7300 126.1300 21.00 16.00 5.00 338994 TAP 2012 06 20 08 27 00 3801-99 G co CCGG 200.950 -999.990 ... V4 2012 08 08 10 48 00 36.7300 126.1300 21.00 16.00 5.00 338991 TAP 2012 06 20 08 27 00 3802-99 G co CCGG 200.880 -999.990 ... V4 2012 08 08 11 03 00 36.7300 126.1300 21.00 16.00 5.00 338992 TAP 2012 06 26 08 11 00 245-99 G co CCGG 181.250 -999.990 ... V4 2012 08 21 12 45 00 36.7300 126.1300 21.00 16.00 5.00 339520 TAP 2012 06 26 08 11 00 246-99 G co CCGG 182.980 -999.990 ... V4 2012 08 21 13 00 00 36.7300 126.1300 21.00 16.00 5.00 339521 TAP 2012 06 26 08 25 00 1173-99 G co CCGG 181.230 -999.990 ... V4 2012 08 21 13 15 00 36.7300 126.1300 21.00 16.00 5.00 339516 TAP 2012 06 26 08 25 00 1174-99 G co CCGG 181.900 -999.990 ... V4 2012 08 21 13 30 00 36.7300 126.1300 21.00 16.00 5.00 339517 TAP 2012 07 02 08 10 00 207-99 G co CCGG 175.170 -999.990 ... V4 2012 08 07 15 54 00 36.7300 126.1300 21.00 16.00 5.00 338987 TAP 2012 07 02 08 10 00 208-99 G co CCGG 174.490 -999.990 ... V4 2012 08 07 16 09 00 36.7300 126.1300 21.00 16.00 5.00 338988 TAP 2012 07 02 08 24 00 5033-99 G co CCGG 177.120 -999.990 ... V4 2012 08 08 10 17 00 36.7300 126.1300 21.00 16.00 5.00 338989 TAP 2012 07 02 08 24 00 5034-99 G co CCGG 176.110 -999.990 ... V4 2012 08 08 10 33 00 36.7300 126.1300 21.00 16.00 5.00 338990 TAP 2012 07 19 05 08 00 2259-99 G co CCGG 158.650 -999.990 ... V4 2012 09 18 14 34 00 36.7300 126.1300 21.00 16.00 5.00 340995 TAP 2012 07 19 05 08 00 3974-99 G co CCGG 159.420 -999.990 ... V4 2012 09 18 14 50 00 36.7300 126.1300 21.00 16.00 5.00 340996 TAP 2012 07 19 05 22 00 2901-99 G co CCGG 165.260 -999.990 ... V4 2012 09 18 15 05 00 36.7300 126.1300 21.00 16.00 5.00 340993 TAP 2012 07 19 05 22 00 4520-99 G co CCGG 162.300 -999.990 ... V4 2012 09 18 15 20 00 36.7300 126.1300 21.00 16.00 5.00 340994 TAP 2012 07 23 05 06 00 3781-99 G co CCGG 74.230 -999.990 -.. V4 2012 09 18 14 04 00 36.7300 126.1300 21.00 16.00 5.00 340991 TAP 2012 07 23 05 06 00 3782-99 G co CCGG 83.380 -999.990 +.. V4 2012 09 18 14 19 00 36.7300 126.1300 21.00 16.00 5.00 340992 TAP 2012 07 23 05 19 00 1225-99 G co CCGG 76.590 -999.990 ... V4 2012 09 18 13 33 00 36.7300 126.1300 21.00 16.00 5.00 340989 TAP 2012 07 23 05 19 00 1226-99 G co CCGG 76.570 -999.990 ... V4 2012 09 18 13 49 00 36.7300 126.1300 21.00 16.00 5.00 340990 TAP 2012 07 29 04 38 00 2487-99 G co CCGG 71.560 -999.990 ... V4 2012 11 06 10 21 00 36.7376 126.1328 21.00 16.00 5.00 343145 TAP 2012 07 29 04 38 00 4077-99 G co CCGG 70.940 -999.990 ... V4 2012 11 06 10 36 00 36.7376 126.1328 21.00 16.00 5.00 343146 TAP 2012 07 29 04 53 00 2497-99 G co CCGG 73.880 -999.990 ... V4 2012 11 06 09 50 00 36.7376 126.1328 21.00 16.00 5.00 343147 TAP 2012 07 29 04 53 00 4766-99 G co CCGG 72.050 -999.990 ... V4 2012 11 06 10 05 00 36.7376 126.1328 21.00 16.00 5.00 343148 TAP 2012 08 06 06 15 00 1175-99 G co CCGG 246.880 -999.990 ... V4 2012 11 06 09 20 00 36.7376 126.1328 21.00 16.00 5.00 343141 TAP 2012 08 06 06 15 00 4211-99 G co CCGG 248.310 -999.990 ... V4 2012 11 06 09 35 00 36.7376 126.1328 21.00 16.00 5.00 343142 TAP 2012 08 06 06 29 00 1346-99 G co CCGG 260.500 -999.990 ... V4 2012 11 06 08 49 00 36.7376 126.1328 21.00 16.00 5.00 343143 TAP 2012 08 06 06 29 00 2927-99 G co CCGG 259.560 -999.990 ... V4 2012 11 06 09 04 00 36.7376 126.1328 21.00 16.00 5.00 343144 TAP 2012 08 17 07 15 00 2781-99 G co CCGG 94.460 -999.990 ... V4 2012 11 02 13 48 00 36.7376 126.1328 21.00 16.00 5.00 343149 TAP 2012 08 17 07 15 00 3992-99 G co CCGG 93.660 -999.990 ... V4 2012 11 02 14 03 00 36.7376 126.1328 21.00 16.00 5.00 343150 TAP 2012 08 17 07 29 00 1554-99 G co CCGG 95.300 -999.990 ... V4 2012 11 02 13 16 00 36.7376 126.1328 21.00 16.00 5.00 343151 TAP 2012 08 17 07 29 00 5150-99 G co CCGG 92.940 -999.990 ... V4 2012 11 02 13 31 00 36.7376 126.1328 21.00 16.00 5.00 343152 TAP 2012 08 26 04 34 00 586-99 G co CCGG 311.450 -999.990 ... V4 2012 11 07 13 01 00 36.7376 126.1328 21.00 16.00 5.00 343251 TAP 2012 08 26 04 34 00 889-99 G co CCGG 311.170 -999.990 ... V4 2012 11 07 13 16 00 36.7376 126.1328 21.00 16.00 5.00 343252 TAP 2012 08 26 04 49 00 3231-99 G co CCGG 307.190 -999.990 ... V4 2012 11 07 13 31 00 36.7376 126.1328 21.00 16.00 5.00 343253 TAP 2012 08 26 04 49 00 4289-99 G co CCGG 306.480 -999.990 ... V4 2012 11 07 13 47 00 36.7376 126.1328 21.00 16.00 5.00 343254 TAP 2012 09 02 04 12 00 3139-99 G co CCGG 491.310 -999.990 .X. V4 2012 11 29 10 02 00 36.7376 126.1328 21.00 16.00 5.00 344317 TAP 2012 09 02 04 12 00 4293-99 G co CCGG 491.370 -999.990 .X. V4 2012 11 29 10 18 00 36.7376 126.1328 21.00 16.00 5.00 344318 TAP 2012 09 02 04 26 00 2938-99 G co CCGG 484.350 -999.990 .X. V4 2012 11 29 10 33 00 36.7376 126.1328 21.00 16.00 5.00 344315 TAP 2012 09 02 04 26 00 3232-99 G co CCGG 485.740 -999.990 .X. V4 2012 11 29 10 48 00 36.7376 126.1328 21.00 16.00 5.00 344316 TAP 2012 09 18 06 00 00 4259-99 G co CCGG 241.150 -999.990 ... V4 2012 11 29 12 35 00 36.7376 126.1328 21.00 16.00 5.00 344301 TAP 2012 09 18 06 00 00 4260-99 G co CCGG 240.090 -999.990 ... V4 2012 11 29 12 50 00 36.7376 126.1328 21.00 16.00 5.00 344302 TAP 2012 09 18 06 18 00 2925-99 G co CCGG 241.670 -999.990 ... V4 2012 11 29 12 04 00 36.7376 126.1328 21.00 16.00 5.00 344303 TAP 2012 09 18 06 18 00 2926-99 G co CCGG 240.190 -999.990 ... V4 2012 11 29 12 19 00 36.7376 126.1328 21.00 16.00 5.00 344304 TAP 2012 09 25 05 08 00 3919-99 G co CCGG 197.670 -999.990 ... V4 2012 11 29 16 38 00 36.7376 126.1328 21.00 16.00 5.00 344329 TAP 2012 09 25 05 08 00 3920-99 G co CCGG 198.250 -999.990 ... V4 2012 11 29 16 53 00 36.7376 126.1328 21.00 16.00 5.00 344330 TAP 2012 09 25 05 24 00 5207-99 G co CCGG 201.610 -999.990 ... V4 2012 11 30 10 25 00 36.7376 126.1328 21.00 16.00 5.00 344327 TAP 2012 09 25 05 24 00 5208-99 G co CCGG 201.640 -999.990 ... V4 2012 11 30 10 40 00 36.7376 126.1328 21.00 16.00 5.00 344328 TAP 2012 10 02 05 16 00 179-99 G co CCGG 212.290 -999.990 ... V4 2012 11 29 11 03 00 36.7376 126.1328 21.00 16.00 5.00 344319 TAP 2012 10 02 05 16 00 3925-99 G co CCGG 212.460 -999.990 ... V4 2012 11 29 11 18 00 36.7376 126.1328 21.00 16.00 5.00 344320 TAP 2012 10 02 05 31 00 5406-99 G co CCGG 211.110 -999.990 ... V4 2012 11 29 11 49 00 36.7376 126.1328 21.00 16.00 5.00 344322 TAP 2012 10 02 05 31 00 582-99 G co CCGG 211.290 -999.990 ... V4 2012 11 29 11 34 00 36.7376 126.1328 21.00 16.00 5.00 344321 TAP 2012 10 07 04 00 00 5387-99 G co CCGG 322.340 -999.990 ... V4 2012 12 05 10 37 00 36.7376 126.1328 21.00 16.00 5.00 344333 TAP 2012 10 07 04 00 00 5388-99 G co CCGG 323.700 -999.990 ... V4 2012 12 05 10 52 00 36.7376 126.1328 21.00 16.00 5.00 344334 TAP 2012 10 07 04 14 00 3761-99 G co CCGG 345.330 -999.990 +.. V4 2012 12 04 14 35 00 36.7376 126.1328 21.00 16.00 5.00 344331 TAP 2012 10 07 04 14 00 3762-99 G co CCGG 338.380 -999.990 -.. V4 2012 12 04 14 50 00 36.7376 126.1328 21.00 16.00 5.00 344332 TAP 2012 10 14 06 01 00 1892-99 G co CCGG 177.960 -999.990 ... V4 2012 11 29 16 08 00 36.7376 126.1328 21.00 16.00 5.00 344325 TAP 2012 10 14 06 01 00 4415-99 G co CCGG 176.620 -999.990 ... V4 2012 11 29 16 23 00 36.7376 126.1328 21.00 16.00 5.00 344326 TAP 2012 10 14 06 14 00 2698-99 G co CCGG 178.230 -999.990 ... V4 2012 11 29 15 53 00 36.7376 126.1328 21.00 16.00 5.00 344324 TAP 2012 10 14 06 14 00 703-99 G co CCGG 178.650 -999.990 ... V4 2012 11 29 15 37 00 36.7376 126.1328 21.00 16.00 5.00 344323 TAP 2012 10 21 04 07 00 1251-99 G co CCGG 266.140 -999.990 ... V4 2012 12 07 13 05 00 36.7376 126.1328 21.00 16.00 5.00 344652 TAP 2012 10 21 04 07 00 4962-99 G co CCGG 267.420 -999.990 ... V4 2012 12 07 13 21 00 36.7376 126.1328 21.00 16.00 5.00 344653 TAP 2012 10 21 04 20 00 1485-99 G co CCGG 265.390 -999.990 ... V4 2012 12 07 12 35 00 36.7376 126.1328 21.00 16.00 5.00 344654 TAP 2012 10 21 04 20 00 2543-99 G co CCGG 265.830 -999.990 ... V4 2012 12 07 12 50 00 36.7376 126.1328 21.00 16.00 5.00 344655 TAP 2012 10 23 05 45 00 3205-99 G co CCGG 182.360 -999.990 ... V2 2012 12 13 15 00 00 36.7376 126.1328 21.00 16.00 5.00 344662 TAP 2012 10 23 05 45 00 3206-99 G co CCGG 182.360 -999.990 ... V2 2012 12 13 15 16 00 36.7376 126.1328 21.00 16.00 5.00 344663 TAP 2012 10 23 05 58 00 3921-99 G co CCGG 179.580 -999.990 ... V2 2012 12 13 15 33 00 36.7376 126.1328 21.00 16.00 5.00 344660 TAP 2012 10 23 05 58 00 3922-99 G co CCGG 179.340 -999.990 ... V2 2012 12 13 15 49 00 36.7376 126.1328 21.00 16.00 5.00 344661 TAP 2012 10 28 04 07 00 112-99 G co CCGG 239.980 -999.990 ... V4 2013 01 03 14 49 00 36.7376 126.1328 21.00 16.00 5.00 345278 TAP 2012 10 28 04 07 00 2719-99 G co CCGG 240.050 -999.990 ... V4 2013 01 03 15 04 00 36.7376 126.1328 21.00 16.00 5.00 345279 TAP 2012 10 28 04 21 00 2794-99 G co CCGG 219.910 -999.990 ... V4 2013 01 03 14 18 00 36.7376 126.1328 21.00 16.00 5.00 345280 TAP 2012 10 28 04 21 00 4136-99 G co CCGG 222.750 -999.990 ... V4 2013 01 03 14 33 00 36.7376 126.1328 21.00 16.00 5.00 345281 TAP 2012 11 12 07 03 00 3349-99 G co CCGG 178.280 -999.990 ... V4 2013 01 03 13 48 00 36.7376 126.1328 21.00 16.00 5.00 345284 TAP 2012 11 12 07 03 00 3350-99 G co CCGG 177.610 -999.990 ... V4 2013 01 03 14 03 00 36.7376 126.1328 21.00 16.00 5.00 345285 TAP 2012 11 12 07 16 00 2787-99 G co CCGG 175.250 -999.990 ... V2 2013 01 03 13 35 00 36.7376 126.1328 21.00 16.00 5.00 345282 TAP 2012 11 12 07 16 00 2788-99 G co CCGG 174.340 -999.990 ... V2 2013 01 03 13 52 00 36.7376 126.1328 21.00 16.00 5.00 345283 TAP 2012 11 20 07 15 00 2525-99 G co CCGG 233.640 -999.990 ... V4 2013 02 14 10 33 00 36.7376 126.1328 21.00 16.00 5.00 347580 TAP 2012 11 20 07 15 00 3276-99 G co CCGG 234.530 -999.990 ... V4 2013 02 14 10 48 00 36.7376 126.1328 21.00 16.00 5.00 347579 TAP 2012 11 20 07 28 00 3128-99 G co CCGG 234.170 -999.990 ... V4 2013 02 14 10 03 00 36.7376 126.1328 21.00 16.00 5.00 347578 TAP 2012 11 20 07 28 00 4366-99 G co CCGG 234.270 -999.990 ... V4 2013 02 14 10 18 00 36.7376 126.1328 21.00 16.00 5.00 347577 TAP 2012 11 29 07 42 00 3370-99 G co CCGG 171.440 -999.990 ... V4 2013 04 19 14 51 00 36.7376 126.1328 21.00 16.00 5.00 350269 TAP 2012 11 29 07 42 00 3621-99 G co CCGG 171.730 -999.990 ... V4 2013 04 19 15 07 00 36.7376 126.1328 21.00 16.00 5.00 350270 TAP 2012 11 29 07 55 00 1832-99 G co CCGG 214.580 -999.990 ... V4 2013 04 19 14 19 00 36.7376 126.1328 21.00 16.00 5.00 350267 TAP 2012 11 29 07 55 00 3275-99 G co CCGG 212.030 -999.990 ... V4 2013 04 19 14 35 00 36.7376 126.1328 21.00 16.00 5.00 350268 TAP 2012 12 18 06 05 00 1189-99 G co CCGG 210.390 -999.990 ... V4 2013 02 14 13 35 00 36.7376 126.1328 21.00 16.00 5.00 347605 TAP 2012 12 18 06 05 00 2396-99 G co CCGG 209.590 -999.990 ... V4 2013 02 14 13 51 00 36.7376 126.1328 21.00 16.00 5.00 347606 TAP 2012 12 18 06 19 00 1727-99 G co CCGG 216.030 -999.990 ... V4 2013 02 14 13 05 00 36.7376 126.1328 21.00 16.00 5.00 347607 TAP 2012 12 18 06 19 00 3978-99 G co CCGG 216.520 -999.990 ... V4 2013 02 14 13 20 00 36.7376 126.1328 21.00 16.00 5.00 347608 TAP 2013 01 06 04 25 00 2751-99 G co CCGG 480.760 -999.990 +.. V4 2013 02 14 14 36 00 36.7376 126.1328 21.00 16.00 5.00 347601 TAP 2013 01 06 04 25 00 2752-99 G co CCGG 476.790 -999.990 -.. V4 2013 02 14 14 51 00 36.7376 126.1328 21.00 16.00 5.00 347602 TAP 2013 01 06 04 38 00 4359-99 G co CCGG 472.780 -999.990 -.. V4 2013 02 14 14 06 00 36.7376 126.1328 21.00 16.00 5.00 347603 TAP 2013 01 06 04 38 00 4360-99 G co CCGG 479.620 -999.990 +.. V4 2013 02 14 14 21 00 36.7376 126.1328 21.00 16.00 5.00 347604 TAP 2013 01 25 06 12 00 1263-99 G co CCGG 185.020 -999.990 +.. V4 2013 05 08 12 23 00 36.7376 126.1328 21.00 16.00 5.00 350790 TAP 2013 01 25 06 12 00 5211-99 G co CCGG 181.220 -999.990 -.. V4 2013 05 08 12 39 00 36.7376 126.1328 21.00 16.00 5.00 350791 TAP 2013 01 25 06 25 00 231-99 G co CCGG 179.600 -999.990 ... V4 2013 04 24 10 47 00 36.7376 126.1328 21.00 16.00 5.00 350489 TAP 2013 01 25 06 25 00 933-99 G co CCGG 177.710 -999.990 ... V4 2013 04 24 11 03 00 36.7376 126.1328 21.00 16.00 5.00 350490 TAP 2013 02 06 05 54 00 150-99 G co CCGG 542.060 -999.990 .XC V4 2013 04 23 15 21 00 36.7376 126.1328 21.00 16.00 5.00 350500 TAP 2013 02 06 05 54 00 1828-99 G co CCGG 544.140 -999.990 .XC V4 2013 04 23 15 37 00 36.7376 126.1328 21.00 16.00 5.00 350501 TAP 2013 02 06 06 07 00 2271-99 G co CCGG 550.190 -999.990 -.C V4 2013 04 24 11 19 00 36.7376 126.1328 21.00 16.00 5.00 350491 TAP 2013 02 06 06 07 00 3281-99 G co CCGG 553.360 -999.990 +.C V4 2013 04 24 11 35 00 36.7376 126.1328 21.00 16.00 5.00 350492 TAP 2013 02 11 07 45 00 1761-99 G co CCGG 247.300 -999.990 ... V4 2013 04 24 10 15 00 36.7376 126.1328 21.00 16.00 5.00 350502 TAP 2013 02 11 07 45 00 3760-99 G co CCGG 244.880 -999.990 ... V4 2013 04 24 10 31 00 36.7376 126.1328 21.00 16.00 5.00 350503 TAP 2013 02 11 08 00 00 1993-99 G co CCGG 240.110 -999.990 ... V4 2013 04 24 12 23 00 36.7376 126.1328 21.00 16.00 5.00 350494 TAP 2013 02 11 08 00 00 222-99 G co CCGG 241.750 -999.990 ... V4 2013 04 24 12 39 00 36.7376 126.1328 21.00 16.00 5.00 350495 TAP 2013 02 16 05 55 00 1860-99 G co CCGG 266.440 -999.990 ... V4 2013 04 30 09 55 00 36.7376 126.1328 21.00 16.00 5.00 350598 TAP 2013 02 16 05 55 00 4382-99 G co CCGG 265.970 -999.990 ... V4 2013 04 30 10 11 00 36.7376 126.1328 21.00 16.00 5.00 350599 TAP 2013 02 16 06 08 00 1237-99 G co CCGG 268.220 -999.990 ... V4 2013 04 30 09 23 00 36.7376 126.1328 21.00 16.00 5.00 350596 TAP 2013 02 16 06 08 00 1760-99 G co CCGG 268.550 -999.990 ... V4 2013 04 30 09 39 00 36.7376 126.1328 21.00 16.00 5.00 350597 TAP 2013 02 23 06 40 00 1370-99 G co CCGG 209.640 -999.990 ... V4 2013 04 22 17 45 00 36.7376 126.1328 21.00 16.00 5.00 350392 TAP 2013 02 23 06 40 00 871-99 G co CCGG 209.010 -999.990 ... V4 2013 04 22 17 29 00 36.7376 126.1328 21.00 16.00 5.00 350391 TAP 2013 02 23 06 54 00 1070-99 G co CCGG 205.600 -999.990 ... V4 2013 04 22 18 00 00 36.7376 126.1328 21.00 16.00 5.00 350393 TAP 2013 02 23 06 54 00 4717-99 G co CCGG 206.050 -999.990 ... V4 2013 04 22 18 16 00 36.7376 126.1328 21.00 16.00 5.00 350394 TAP 2013 03 03 05 51 00 4081-99 G co CCGG 213.410 -999.990 ... V4 2013 04 24 12 07 00 36.7376 126.1328 21.00 16.00 5.00 350493 TAP 2013 03 03 06 04 00 317-99 G co CCGG 219.930 -999.990 ... V4 2013 05 07 09 31 00 36.7376 126.1328 21.00 16.00 5.00 350792 TAP 2013 03 03 06 04 00 5212-99 G co CCGG 220.850 -999.990 ... V4 2013 05 07 09 47 00 36.7376 126.1328 21.00 16.00 5.00 350793 TAP 2013 03 11 04 40 00 4424-99 G co CCGG 287.620 -999.990 +.. V2 2013 05 10 14 35 00 36.7376 126.1328 21.00 16.00 5.00 351252 TAP 2013 03 11 04 40 00 75-99 G co CCGG 284.770 -999.990 -.. V2 2013 05 10 14 19 00 36.7376 126.1328 21.00 16.00 5.00 351253 TAP 2013 03 11 04 54 00 2481-99 G co CCGG 281.010 -999.990 -.. V2 2013 05 14 13 02 00 36.7376 126.1328 21.00 16.00 5.00 351256 TAP 2013 03 11 04 54 00 4975-99 G co CCGG 287.270 -999.990 +.. V2 2013 05 14 13 18 00 36.7376 126.1328 21.00 16.00 5.00 351257 TAP 2013 03 21 04 29 00 265-99 G co CCGG 196.520 -999.990 -.. V2 2013 05 14 10 52 00 36.7376 126.1328 21.00 16.00 5.00 351254 TAP 2013 03 21 04 29 00 3028-99 G co CCGG 202.210 -999.990 +.. V2 2013 05 14 11 08 00 36.7376 126.1328 21.00 16.00 5.00 351255 TAP 2013 03 21 04 44 00 2845-99 G co CCGG 202.850 -999.990 ... V2 2013 05 14 11 24 00 36.7376 126.1328 21.00 16.00 5.00 351258 TAP 2013 03 21 04 44 00 4752-99 G co CCGG 202.820 -999.990 ... V2 2013 05 14 11 41 00 36.7376 126.1328 21.00 16.00 5.00 351259 TAP 2013 03 25 06 44 00 4405-99 G co CCGG 203.270 -999.990 ... V4 2013 05 29 14 24 00 36.7376 126.1328 21.00 16.00 5.00 352116 TAP 2013 03 25 06 44 00 4406-99 G co CCGG 204.080 -999.990 ... V4 2013 05 29 14 40 00 36.7376 126.1328 21.00 16.00 5.00 352117 TAP 2013 03 25 06 57 00 6681-66 G co CCGG 206.980 -999.990 ... V4 2013 05 29 13 52 00 36.7376 126.1328 21.00 16.00 5.00 352118 TAP 2013 03 25 06 57 00 6682-66 G co CCGG 204.360 -999.990 ... V4 2013 05 29 14 08 00 36.7376 126.1328 21.00 16.00 5.00 352119 TAP 2013 04 15 08 16 00 1441-99 G co CCGG 310.110 -999.990 ... V4 2013 05 23 15 44 00 36.7376 126.1328 21.00 16.00 5.00 351892 TAP 2013 04 15 08 16 00 311-99 G co CCGG 310.820 -999.990 ... V4 2013 05 23 15 28 00 36.7376 126.1328 21.00 16.00 5.00 351893 TAP 2013 04 15 08 16 00 4373-99 G co CCGG 299.250 -999.990 ... V4 2013 05 23 14 56 00 36.7376 126.1328 21.00 16.00 5.00 351890 TAP 2013 04 15 08 16 00 4511-99 G co CCGG 296.960 -999.990 ... V4 2013 05 23 15 12 00 36.7376 126.1328 21.00 16.00 5.00 351891 TAP 2013 04 22 07 00 00 2934-99 G co CCGG 483.400 -999.990 -.. V4 2013 07 16 13 31 00 36.7376 126.1328 21.00 16.00 5.00 354341 TAP 2013 04 22 07 00 00 4672-99 G co CCGG 488.270 -999.990 +.. V4 2013 07 16 13 47 00 36.7376 126.1328 21.00 16.00 5.00 354342 TAP 2013 04 22 07 14 00 409-99 G co CCGG 484.400 -999.990 .X. V4 2013 07 16 14 03 00 36.7376 126.1328 21.00 16.00 5.00 354343 TAP 2013 04 22 07 14 00 4223-99 G co CCGG 482.690 -999.990 .X. V4 2013 07 16 14 19 00 36.7376 126.1328 21.00 16.00 5.00 354344 TAP 2013 04 26 07 40 00 3156-99 G co CCGG 295.550 -999.990 ... V4 2013 07 16 10 50 00 36.7376 126.1328 21.00 16.00 5.00 354353 TAP 2013 04 26 07 40 00 5345-99 G co CCGG 295.850 -999.990 ... V4 2013 07 16 11 06 00 36.7376 126.1328 21.00 16.00 5.00 354354 TAP 2013 04 26 07 55 00 5065-99 G co CCGG 296.700 -999.990 ... V4 2013 07 16 10 34 00 36.7376 126.1328 21.00 16.00 5.00 354356 TAP 2013 04 26 07 55 00 801-99 G co CCGG 296.270 -999.990 ... V4 2013 07 16 10 18 00 36.7376 126.1328 21.00 16.00 5.00 354355 TAP 2013 05 01 05 20 00 3186-99 G co CCGG 238.160 -999.990 -.. V4 2013 07 16 14 51 00 36.7376 126.1328 21.00 16.00 5.00 354348 TAP 2013 05 01 05 20 00 583-99 G co CCGG 241.190 -999.990 +.. V4 2013 07 16 14 35 00 36.7376 126.1328 21.00 16.00 5.00 354347 TAP 2013 05 01 05 35 00 3094-99 G co CCGG 254.200 -999.990 ... V4 2013 07 16 15 23 00 36.7376 126.1328 21.00 16.00 5.00 354346 TAP 2013 05 01 05 35 00 824-99 G co CCGG 252.210 -999.990 ... V4 2013 07 16 15 07 00 36.7376 126.1328 21.00 16.00 5.00 354345 TAP 2013 05 10 05 52 00 1994-99 G co CCGG 290.030 -999.990 ... V4 2013 07 29 13 40 00 36.7376 126.1328 21.00 16.00 5.00 354835 TAP 2013 05 10 05 52 00 4003-99 G co CCGG 287.520 -999.990 ... V4 2013 07 29 13 56 00 36.7376 126.1328 21.00 16.00 5.00 354836 TAP 2013 05 10 06 05 00 3153-99 G co CCGG 283.400 -999.990 ... V4 2013 07 29 13 24 00 36.7376 126.1328 21.00 16.00 5.00 354839 TAP 2013 05 10 06 05 00 909-99 G co CCGG 283.560 -999.990 ... V4 2013 07 29 13 08 00 36.7376 126.1328 21.00 16.00 5.00 354840 TAP 2013 05 21 05 00 00 661-99 G co CCGG 307.490 -999.990 ... V4 2013 07 29 11 32 00 36.7376 126.1328 21.00 16.00 5.00 354845 TAP 2013 05 21 05 00 00 662-99 G co CCGG 307.280 -999.990 ... V4 2013 07 29 11 48 00 36.7376 126.1328 21.00 16.00 5.00 354846 TAP 2013 05 21 05 14 00 1529-99 G co CCGG 309.850 -999.990 ... V4 2013 07 29 11 00 00 36.7376 126.1328 21.00 16.00 5.00 354847 TAP 2013 05 21 05 14 00 1530-99 G co CCGG 307.610 -999.990 ... V4 2013 07 29 11 16 00 36.7376 126.1328 21.00 16.00 5.00 354848 TAP 2013 06 01 05 45 00 1185-99 G co CCGG 453.510 -999.990 .X. V4 2013 07 29 12 52 00 36.7376 126.1328 21.00 16.00 5.00 354838 TAP 2013 06 01 05 45 00 157-99 G co CCGG 455.020 -999.990 .X. V4 2013 07 29 12 36 00 36.7376 126.1328 21.00 16.00 5.00 354837 TAP 2013 06 01 07 31 00 3859-99 G co CCGG 481.810 -999.990 .X. V4 2013 07 29 12 04 00 36.7376 126.1328 21.00 16.00 5.00 354833 TAP 2013 06 01 07 31 00 5268-99 G co CCGG 482.410 -999.990 .X. V4 2013 07 29 12 20 00 36.7376 126.1328 21.00 16.00 5.00 354834 TAP 2013 06 07 08 15 00 743-99 G co CCGG 133.200 -999.990 -.. V4 2013 08 13 15 52 00 36.7376 126.1328 21.00 16.00 5.00 355686 TAP 2013 06 07 08 15 00 872-99 G co CCGG 136.270 -999.990 +.. V4 2013 08 13 16 08 00 36.7376 126.1328 21.00 16.00 5.00 355687 TAP 2013 06 07 08 28 00 2873-99 G co CCGG 144.230 -999.990 ... V4 2013 08 14 09 15 00 36.7376 126.1328 21.00 16.00 5.00 355682 TAP 2013 06 07 08 28 00 4402-99 G co CCGG 145.550 -999.990 ... V4 2013 08 14 09 31 00 36.7376 126.1328 21.00 16.00 5.00 355683 TAP 2013 06 19 07 18 00 3983-99 G co CCGG 259.360 -999.990 -.. V4 2013 08 13 15 36 00 36.7376 126.1328 21.00 16.00 5.00 355689 TAP 2013 06 19 07 18 00 946-99 G co CCGG 267.070 -999.990 +.. V4 2013 08 13 15 20 00 36.7376 126.1328 21.00 16.00 5.00 355688 TAP 2013 06 19 07 31 00 2880-99 G co CCGG 290.170 -999.990 ... V4 2013 08 14 10 03 00 36.7376 126.1328 21.00 16.00 5.00 355685 TAP 2013 06 19 07 31 00 98-99 G co CCGG 291.430 -999.990 ... V4 2013 08 14 09 47 00 36.7376 126.1328 21.00 16.00 5.00 355684 TAP 2013 06 27 08 00 00 2920-99 G co CCGG 247.780 -999.990 ... V3 2013 10 21 16 14 00 36.7376 126.1328 21.00 16.00 5.00 357800 TAP 2013 06 27 08 00 00 4527-99 G co CCGG 247.380 -999.990 ... V3 2013 10 21 16 30 00 36.7376 126.1328 21.00 16.00 5.00 357801 TAP 2013 06 27 08 14 00 4268-99 G co CCGG 255.960 -999.990 ... V3 2013 10 22 15 28 00 36.7376 126.1328 21.00 16.00 5.00 357796 TAP 2013 06 27 08 14 00 4487-99 G co CCGG 254.290 -999.990 ... V3 2013 10 22 15 12 00 36.7376 126.1328 21.00 16.00 5.00 357797 TAP 2013 07 05 06 00 00 1554-99 G co CCGG 228.460 -999.990 -.. V3 2013 10 23 12 45 00 36.7376 126.1328 21.00 16.00 5.00 358052 TAP 2013 07 05 06 00 00 3056-99 G co CCGG 244.180 -999.990 +.. V3 2013 10 23 13 01 00 36.7376 126.1328 21.00 16.00 5.00 358053 TAP 2013 07 05 06 14 00 1479-99 G co CCGG 179.470 -999.990 -.. V3 2013 10 23 13 33 00 36.7376 126.1328 21.00 16.00 5.00 358055 TAP 2013 07 05 06 14 00 673-99 G co CCGG 184.900 -999.990 +.. V3 2013 10 23 13 17 00 36.7376 126.1328 21.00 16.00 5.00 358054 TAP 2013 07 15 05 56 00 267-99 G co CCGG 66.160 -999.990 ... V4 2013 10 24 10 31 00 36.7376 126.1328 21.00 16.00 5.00 358060 TAP 2013 07 15 05 56 00 268-99 G co CCGG 65.860 -999.990 ... V4 2013 10 24 10 47 00 36.7376 126.1328 21.00 16.00 5.00 358061 TAP 2013 07 15 06 08 00 1523-99 G co CCGG 68.010 -999.990 ... V4 2013 10 24 09 59 00 36.7376 126.1328 21.00 16.00 5.00 358062 TAP 2013 07 15 06 08 00 1524-99 G co CCGG 66.610 -999.990 ... V4 2013 10 24 10 15 00 36.7376 126.1328 21.00 16.00 5.00 358063 TAP 2013 07 25 05 08 00 1499-99 G co CCGG 662.410 -999.990 +.. V3 2013 10 17 14 59 00 36.7376 126.1328 21.00 16.00 5.00 357688 TAP 2013 07 25 05 08 00 893-99 G co CCGG 658.070 -999.990 -.. V3 2013 10 17 14 42 00 36.7376 126.1328 21.00 16.00 5.00 357689 TAP 2013 07 25 05 22 00 2385-99 G co CCGG 671.270 -999.990 .XC V3 2013 10 17 15 31 00 36.7376 126.1328 21.00 16.00 5.00 357690 TAP 2013 07 25 05 22 00 318-99 G co CCGG 672.800 -999.990 .XC V3 2013 10 17 15 15 00 36.7376 126.1328 21.00 16.00 5.00 357691 TAP 2013 08 03 05 25 00 1762-99 G co CCGG 75.460 -999.990 ... V3 2013 10 21 15 09 00 36.7376 126.1328 21.00 16.00 5.00 357794 TAP 2013 08 03 05 25 00 1940-99 G co CCGG 75.430 -999.990 ... V3 2013 10 21 15 25 00 36.7376 126.1328 21.00 16.00 5.00 357795 TAP 2013 08 03 05 38 00 112-99 G co CCGG 78.370 -999.990 ... V3 2013 10 21 15 42 00 36.7376 126.1328 21.00 16.00 5.00 357798 TAP 2013 08 03 05 38 00 450-99 G co CCGG 78.980 -999.990 ... V3 2013 10 21 15 58 00 36.7376 126.1328 21.00 16.00 5.00 357799 TAP 2013 08 11 05 25 00 252-99 G co CCGG 173.010 -999.990 +.. V4 2013 10 22 15 13 00 36.7376 126.1328 21.00 16.00 5.00 357820 TAP 2013 08 11 05 25 00 3945-99 G co CCGG 162.410 -999.990 -.. V4 2013 10 22 15 29 00 36.7376 126.1328 21.00 16.00 5.00 357821 TAP 2013 08 11 05 39 00 3540-99 G co CCGG 143.620 -999.990 ... V4 2013 10 22 14 41 00 36.7376 126.1328 21.00 16.00 5.00 357819 TAP 2013 08 11 05 39 00 5376-99 G co CCGG 140.780 -999.990 ... V4 2013 10 22 14 57 00 36.7376 126.1328 21.00 16.00 5.00 357818 TAP 2013 08 25 03 55 00 1731-99 G co CCGG 430.950 -999.990 .X. V3 2013 11 05 11 40 00 36.7376 126.1328 21.00 16.00 5.00 358679 TAP 2013 08 25 03 55 00 1732-99 G co CCGG 431.800 -999.990 .X. V3 2013 11 05 11 57 00 36.7376 126.1328 21.00 16.00 5.00 358680 TAP 2013 08 25 04 08 00 725-99 G co CCGG 443.280 -999.990 .X. V3 2013 11 05 11 08 00 36.7376 126.1328 21.00 16.00 5.00 358677 TAP 2013 08 25 04 08 00 726-99 G co CCGG 443.940 -999.990 .X. V3 2013 11 05 11 24 00 36.7376 126.1328 21.00 16.00 5.00 358678 TAP 2013 09 01 04 15 00 5065-99 G co CCGG 184.540 -999.990 ... V4 2013 11 05 10 51 00 36.7376 126.1328 21.00 16.00 5.00 358674 TAP 2013 09 01 04 15 00 801-99 G co CCGG 185.320 -999.990 ... V4 2013 11 05 10 35 00 36.7376 126.1328 21.00 16.00 5.00 358673 TAP 2013 09 01 04 28 00 2300-99 G co CCGG 188.970 -999.990 ... V3 2013 11 05 10 36 00 36.7376 126.1328 21.00 16.00 5.00 358675 TAP 2013 09 01 04 28 00 4415-99 G co CCGG 189.350 -999.990 ... V3 2013 11 05 10 52 00 36.7376 126.1328 21.00 16.00 5.00 358676 TAP 2013 09 15 04 06 00 389-99 G co CCGG 227.350 -999.990 ... V4 2014 01 09 15 41 00 36.7376 126.1328 21.00 16.00 5.00 362386 TAP 2013 09 15 04 06 00 390-99 G co CCGG 229.840 -999.990 ... V4 2014 01 09 15 57 00 36.7376 126.1328 21.00 16.00 5.00 362387 TAP 2013 09 15 04 30 00 1897-99 G co CCGG 229.710 -999.990 +.. V4 2014 01 09 16 13 00 36.7376 126.1328 21.00 16.00 5.00 362390 TAP 2013 09 15 04 30 00 1898-99 G co CCGG 225.680 -999.990 -.. V4 2014 01 09 16 29 00 36.7376 126.1328 21.00 16.00 5.00 362391 TAP 2013 09 20 05 08 00 2475-99 G co CCGG 376.830 -999.990 .X. V4 2014 01 09 09 17 00 36.7376 126.1328 21.00 16.00 5.00 362374 TAP 2013 09 20 05 08 00 2476-99 G co CCGG 377.200 -999.990 .X. V4 2014 01 09 09 33 00 36.7376 126.1328 21.00 16.00 5.00 362375 TAP 2013 09 20 05 22 00 1791-99 G co CCGG 363.000 -999.990 -.. V4 2014 01 09 09 49 00 36.7376 126.1328 21.00 16.00 5.00 362372 TAP 2013 09 20 05 22 00 1792-99 G co CCGG 366.640 -999.990 +.. V4 2014 01 09 10 05 00 36.7376 126.1328 21.00 16.00 5.00 362373 TAP 2013 09 30 05 03 00 957-99 G co CCGG 218.090 -999.990 ... V4 2014 01 08 14 50 00 36.7376 126.1328 21.00 16.00 5.00 362378 TAP 2013 09 30 05 03 00 958-99 G co CCGG 218.670 -999.990 ... V4 2014 01 08 15 06 00 36.7376 126.1328 21.00 16.00 5.00 362379 TAP 2013 09 30 05 16 00 1193-99 G co CCGG 227.000 -999.990 ... V4 2014 01 08 14 18 00 36.7376 126.1328 21.00 16.00 5.00 362376 TAP 2013 09 30 05 16 00 1194-99 G co CCGG 226.520 -999.990 ... V4 2014 01 08 14 34 00 36.7376 126.1328 21.00 16.00 5.00 362377 TAP 2013 10 05 07 52 00 202-99 G co CCGG 277.640 -999.990 ... V4 2014 01 06 12 16 00 36.7376 126.1328 21.00 16.00 5.00 362217 TAP 2013 10 05 07 52 00 3553-99 G co CCGG 275.960 -999.990 ... V4 2014 01 06 12 32 00 36.7376 126.1328 21.00 16.00 5.00 362218 TAP 2013 10 05 08 03 00 5310-99 G co CCGG 281.090 -999.990 ... V4 2014 01 06 12 00 00 36.7376 126.1328 21.00 16.00 5.00 362219 TAP 2013 10 05 08 03 00 772-99 G co CCGG 280.280 -999.990 ... V4 2014 01 06 11 44 00 36.7376 126.1328 21.00 16.00 5.00 362220 TAP 2013 10 11 05 13 00 2711-99 G co CCGG 133.500 -999.990 ... V4 2014 01 02 11 05 00 36.7376 126.1328 21.00 16.00 5.00 362037 TAP 2013 10 11 05 13 00 2712-99 G co CCGG 134.070 -999.990 ... V4 2014 01 02 11 21 00 36.7376 126.1328 21.00 16.00 5.00 362038 TAP 2013 10 11 05 25 00 315-99 G co CCGG 134.070 -999.990 ... V4 2014 01 02 11 41 00 36.7376 126.1328 21.00 16.00 5.00 362035 TAP 2013 10 11 05 25 00 316-99 G co CCGG 134.420 -999.990 ... V4 2014 01 02 11 57 00 36.7376 126.1328 21.00 16.00 5.00 362036 TAP 2013 10 16 04 15 00 543-99 G co CCGG 134.660 -999.990 ... V4 2013 12 31 11 35 00 36.7376 126.1328 21.00 16.00 5.00 362027 TAP 2013 10 16 04 15 00 544-99 G co CCGG 133.550 -999.990 ... V4 2013 12 31 11 51 00 36.7376 126.1328 21.00 16.00 5.00 362028 TAP 2013 10 16 04 29 00 1657-99 G co CCGG 134.120 -999.990 ... V4 2013 12 31 11 03 00 36.7376 126.1328 21.00 16.00 5.00 362029 TAP 2013 10 16 04 29 00 1658-99 G co CCGG 133.910 -999.990 ... V4 2013 12 31 11 19 00 36.7376 126.1328 21.00 16.00 5.00 362030 TAP 2013 11 05 06 33 00 5239-99 G co CCGG 538.300 -999.990 .X. V4 2014 01 08 16 58 00 36.7376 126.1328 21.00 16.00 5.00 362368 TAP 2013 11 05 06 33 00 5240-99 G co CCGG 537.140 -999.990 .X. V4 2014 01 08 17 14 00 36.7376 126.1328 21.00 16.00 5.00 362369 TAP 2013 11 05 06 45 00 3487-99 G co CCGG 543.450 -999.990 .X. V4 2014 01 08 16 26 00 36.7376 126.1328 21.00 16.00 5.00 362370 TAP 2013 11 05 06 45 00 3488-99 G co CCGG 542.670 -999.990 .X. V4 2014 01 08 16 42 00 36.7376 126.1328 21.00 16.00 5.00 362371 TAP 2013 11 10 05 18 00 3631-99 G co CCGG 124.330 -999.990 ... V4 2014 01 09 14 37 00 36.7376 126.1328 21.00 16.00 5.00 362388 TAP 2013 11 10 05 18 00 4977-99 G co CCGG 123.750 -999.990 ... V4 2014 01 09 14 53 00 36.7376 126.1328 21.00 16.00 5.00 362389 TAP 2013 11 10 05 31 00 4150-99 G co CCGG 122.510 -999.990 ... V4 2014 01 09 15 09 00 36.7376 126.1328 21.00 16.00 5.00 362384 TAP 2013 11 10 05 31 00 5185-99 G co CCGG 122.660 -999.990 ... V4 2014 01 09 15 25 00 36.7376 126.1328 21.00 16.00 5.00 362385 TAP 2013 11 17 04 32 00 297-99 G co CCGG 140.030 -999.990 ... V4 2014 02 05 11 50 00 36.7376 126.1328 21.00 16.00 5.00 363286 TAP 2013 11 17 04 32 00 298-99 G co CCGG 139.100 -999.990 ... V4 2014 02 05 12 06 00 36.7376 126.1328 21.00 16.00 5.00 363287 TAP 2013 11 17 04 45 00 2361-99 G co CCGG 134.500 -999.990 ... V4 2014 02 05 13 26 00 36.7376 126.1328 21.00 16.00 5.00 363288 TAP 2013 11 17 04 45 00 2362-99 G co CCGG 134.840 -999.990 ... V4 2014 02 05 13 42 00 36.7376 126.1328 21.00 16.00 5.00 363289 TAP 2013 11 26 05 03 00 2304-99 G co CCGG 223.670 -999.990 ... V4 2014 02 13 11 41 00 36.7376 126.1328 21.00 16.00 5.00 363693 TAP 2013 11 26 05 03 00 3946-99 G co CCGG 222.710 -999.990 ... V4 2014 02 13 11 57 00 36.7376 126.1328 21.00 16.00 5.00 363694 TAP 2013 11 26 05 14 00 2033-99 G co CCGG 225.380 -999.990 ... V4 2014 02 13 11 09 00 36.7376 126.1328 21.00 16.00 5.00 363695 TAP 2013 11 26 05 14 00 2171-99 G co CCGG 227.110 -999.990 ... V4 2014 02 13 11 25 00 36.7376 126.1328 21.00 16.00 5.00 363696 TAP 2013 12 03 05 23 00 1642-99 G co CCGG 332.040 -999.990 .X. V3 2014 02 04 16 10 00 36.7376 126.1328 21.00 16.00 5.00 363282 TAP 2013 12 03 05 23 00 3277-99 G co CCGG 332.560 -999.990 .X. V3 2014 02 04 16 26 00 36.7376 126.1328 21.00 16.00 5.00 363283 TAP 2013 12 03 05 39 00 4564-99 G co CCGG 333.440 -999.990 .X. V4 2014 02 05 11 17 00 36.7376 126.1328 21.00 16.00 5.00 363284 TAP 2013 12 03 05 39 00 4655-99 G co CCGG 331.680 -999.990 .X. V4 2014 02 05 11 33 00 36.7376 126.1328 21.00 16.00 5.00 363285 TAP 2013 12 10 05 15 00 412-99 G co CCGG 146.600 -999.990 ... V4 2014 02 19 13 59 00 36.7376 126.1328 21.00 16.00 5.00 364111 TAP 2013 12 10 05 15 00 4213-99 G co CCGG 147.410 -999.990 ... V4 2014 02 19 14 15 00 36.7376 126.1328 21.00 16.00 5.00 364112 TAP 2013 12 10 05 29 00 4994-99 G co CCGG 145.130 -999.990 ... V4 2014 02 19 14 47 00 36.7376 126.1328 21.00 16.00 5.00 364114 TAP 2013 12 10 05 29 00 618-99 G co CCGG 146.480 -999.990 ... V4 2014 02 19 14 31 00 36.7376 126.1328 21.00 16.00 5.00 364113 TAP 2013 12 23 04 50 00 2531-99 G co CCGG 232.210 -999.990 ... V4 2014 02 12 10 46 00 36.7376 126.1328 21.00 16.00 5.00 363691 TAP 2013 12 23 04 50 00 5144-99 G co CCGG 231.550 -999.990 ... V4 2014 02 12 11 02 00 36.7376 126.1328 21.00 16.00 5.00 363692 TAP 2013 12 23 05 04 00 2831-99 G co CCGG 236.270 -999.990 ... V4 2014 02 12 10 14 00 36.7376 126.1328 21.00 16.00 5.00 363685 TAP 2013 12 23 05 04 00 4371-99 G co CCGG 235.550 -999.990 ... V4 2014 02 12 10 30 00 36.7376 126.1328 21.00 16.00 5.00 363686 TAP 2013 12 28 05 28 00 4142-99 G co CCGG 208.480 -999.990 ... V4 2014 02 12 11 18 00 36.7376 126.1328 21.00 16.00 5.00 363689 TAP 2013 12 28 05 28 00 4367-99 G co CCGG 208.030 -999.990 ... V4 2014 02 12 11 34 00 36.7376 126.1328 21.00 16.00 5.00 363690 TAP 2013 12 28 05 43 00 4614-99 G co CCGG 209.500 -999.990 ... V4 2014 02 12 11 50 00 36.7376 126.1328 21.00 16.00 5.00 363687 TAP 2013 12 28 05 43 00 4832-99 G co CCGG 209.610 -999.990 ... V4 2014 02 12 12 06 00 36.7376 126.1328 21.00 16.00 5.00 363688 TAP 2014 01 04 06 05 00 3645-99 G co CCGG 229.010 -999.990 ... V3 2014 03 04 11 02 00 36.7376 126.1328 21.00 16.00 5.00 364812 TAP 2014 01 04 06 05 00 788-99 G co CCGG 226.810 -999.990 ... V3 2014 03 04 10 46 00 36.7376 126.1328 21.00 16.00 5.00 364811 TAP 2014 01 04 06 19 00 392-99 G co CCGG 208.300 -999.990 ... V4 2014 02 28 13 52 00 36.7376 126.1328 21.00 16.00 5.00 364819 TAP 2014 01 04 06 19 00 4214-99 G co CCGG 211.240 -999.990 ... V4 2014 02 28 14 08 00 36.7376 126.1328 21.00 16.00 5.00 364820 TAP 2014 01 11 04 52 00 1721-99 G co CCGG 474.430 -999.990 .X. V4 2014 02 28 14 24 00 36.7376 126.1328 21.00 16.00 5.00 364821 TAP 2014 01 11 04 52 00 4202-99 G co CCGG 472.690 -999.990 .X. V4 2014 02 28 14 40 00 36.7376 126.1328 21.00 16.00 5.00 364822 TAP 2014 01 11 05 12 00 4708-99 G co CCGG 468.310 -999.990 -.. V3 2014 03 04 10 30 00 36.7376 126.1328 21.00 16.00 5.00 364814 TAP 2014 01 11 05 12 00 800-99 G co CCGG 472.050 -999.990 +.. V3 2014 03 04 10 14 00 36.7376 126.1328 21.00 16.00 5.00 364813 TAP 2014 01 19 04 02 00 1809-99 G co CCGG 333.780 -999.990 ... V3 2014 03 03 16 13 00 36.7376 126.1328 21.00 16.00 5.00 364825 TAP 2014 01 19 04 02 00 2292-99 G co CCGG 336.520 -999.990 ... V3 2014 03 03 16 29 00 36.7376 126.1328 21.00 16.00 5.00 364826 TAP 2014 01 19 06 16 00 2280-99 G co CCGG 310.880 -999.990 ... V3 2014 02 28 14 55 00 36.7376 126.1328 21.00 16.00 5.00 364818 TAP 2014 01 19 06 16 00 959-99 G co CCGG 311.230 -999.990 ... V3 2014 02 28 14 39 00 36.7376 126.1328 21.00 16.00 5.00 364817 TAP 2014 01 26 04 04 00 2479-99 G co CCGG 190.960 -999.990 ... V3 2014 03 05 15 30 00 36.7376 126.1328 21.00 16.00 5.00 365013 TAP 2014 01 26 04 04 00 2600-99 G co CCGG 191.310 -999.990 ... V3 2014 03 05 15 47 00 36.7376 126.1328 21.00 16.00 5.00 365014 TAP 2014 01 26 04 17 00 1252-99 G co CCGG 191.820 -999.990 ... V3 2014 03 05 14 58 00 36.7376 126.1328 21.00 16.00 5.00 365011 TAP 2014 01 26 04 17 00 5176-99 G co CCGG 191.690 -999.990 ... V3 2014 03 05 15 14 00 36.7376 126.1328 21.00 16.00 5.00 365012 TAP 2014 02 04 04 30 00 1940-99 G co CCGG 161.440 -999.990 ... V4 2014 02 28 12 48 00 36.7376 126.1328 21.00 16.00 5.00 364823 TAP 2014 02 04 04 30 00 4268-99 G co CCGG 160.580 -999.990 ... V4 2014 02 28 13 04 00 36.7376 126.1328 21.00 16.00 5.00 364824 TAP 2014 02 04 04 45 00 2387-99 G co CCGG 161.980 -999.990 ... V3 2014 03 04 11 18 00 36.7376 126.1328 21.00 16.00 5.00 364815 TAP 2014 02 04 04 45 00 4861-99 G co CCGG 163.270 -999.990 ... V3 2014 03 04 11 35 00 36.7376 126.1328 21.00 16.00 5.00 364816 TAP 2014 02 12 02 03 00 2787-99 G co CCGG 230.720 -999.990 ... V4 2014 05 08 09 14 00 36.7376 126.1328 21.00 16.00 5.00 367476 TAP 2014 02 12 02 03 00 2788-99 G co CCGG 229.700 -999.990 ... V4 2014 05 08 09 30 00 36.7376 126.1328 21.00 16.00 5.00 367477 TAP 2014 02 12 02 16 00 1309-99 G co CCGG 222.110 -999.990 ... V4 2014 05 08 10 50 00 36.7376 126.1328 21.00 16.00 5.00 367480 TAP 2014 02 12 02 16 00 1310-99 G co CCGG 222.430 -999.990 ... V4 2014 05 08 11 06 00 36.7376 126.1328 21.00 16.00 5.00 367481 TAP 2014 02 27 06 35 00 1961-99 G co CCGG 643.680 -999.990 .X. V4 2014 05 13 13 39 00 36.7376 126.1328 21.00 16.00 5.00 367472 TAP 2014 02 27 06 35 00 2500-99 G co CCGG 645.180 -999.990 .X. V4 2014 05 13 13 55 00 36.7376 126.1328 21.00 16.00 5.00 367473 TAP 2014 02 27 06 49 00 2043-99 G co CCGG 638.170 -999.990 .X. V4 2014 05 13 12 03 00 36.7376 126.1328 21.00 16.00 5.00 367470 TAP 2014 02 27 06 49 00 2472-99 G co CCGG 638.110 -999.990 .X. V4 2014 05 13 12 19 00 36.7376 126.1328 21.00 16.00 5.00 367471 TAP 2014 03 05 04 00 00 4487-99 G co CCGG 191.500 -999.990 ... V4 2014 05 08 10 02 00 36.7376 126.1328 21.00 16.00 5.00 367475 TAP 2014 03 05 04 00 00 633-99 G co CCGG 191.560 -999.990 ... V4 2014 05 08 09 46 00 36.7376 126.1328 21.00 16.00 5.00 367474 TAP 2014 03 05 04 14 00 4147-99 G co CCGG 192.660 -999.990 ... V4 2014 05 08 10 34 00 36.7376 126.1328 21.00 16.00 5.00 367479 TAP 2014 03 05 04 14 00 519-99 G co CCGG 193.530 -999.990 ... V4 2014 05 08 10 18 00 36.7376 126.1328 21.00 16.00 5.00 367478 TAP 2014 03 09 04 10 00 3309-99 G co CCGG 210.020 -999.990 ... V4 2014 05 22 14 06 00 36.7376 126.1328 21.00 16.00 5.00 368023 TAP 2014 03 09 04 10 00 3321-99 G co CCGG 210.850 -999.990 ... V4 2014 05 22 14 22 00 36.7376 126.1328 21.00 16.00 5.00 368024 TAP 2014 03 09 04 25 00 4005-99 G co CCGG 190.570 -999.990 ... V4 2014 05 22 13 50 00 36.7376 126.1328 21.00 16.00 5.00 368020 TAP 2014 03 09 04 25 00 439-99 G co CCGG 189.420 -999.990 ... V4 2014 05 22 13 34 00 36.7376 126.1328 21.00 16.00 5.00 368019 TAP 2014 03 14 05 00 00 3554-99 G co CCGG 594.790 -999.990 .X. V4 2014 05 29 09 13 00 36.7376 126.1328 21.00 16.00 5.00 368072 TAP 2014 03 14 05 00 00 605-99 G co CCGG 591.310 -999.990 .X. V4 2014 05 29 08 57 00 36.7376 126.1328 21.00 16.00 5.00 368071 TAP 2014 03 14 05 15 00 3226-99 G co CCGG 573.440 -999.990 .X. V4 2014 05 29 09 45 00 36.7376 126.1328 21.00 16.00 5.00 368069 TAP 2014 03 14 05 15 00 65-99 G co CCGG 573.110 -999.990 .X. V4 2014 05 29 09 29 00 36.7376 126.1328 21.00 16.00 5.00 368070 TAP 2014 03 19 05 30 00 5317-99 G co CCGG 331.650 -999.990 ... V4 2014 05 21 15 58 00 36.7376 126.1328 21.00 16.00 5.00 368009 TAP 2014 03 19 05 30 00 5329-99 G co CCGG 333.480 -999.990 ... V4 2014 05 21 16 14 00 36.7376 126.1328 21.00 16.00 5.00 368010 TAP 2014 03 19 05 45 00 4513-99 G co CCGG 308.390 -999.990 ... V4 2014 05 21 15 26 00 36.7376 126.1328 21.00 16.00 5.00 368005 TAP 2014 03 19 05 45 00 4529-99 G co CCGG 307.860 -999.990 ... V4 2014 05 21 15 42 00 36.7376 126.1328 21.00 16.00 5.00 368006 TAP 2014 03 30 05 00 00 1238-99 G co CCGG 438.940 -999.990 .X. V4 2014 05 22 14 38 00 36.7376 126.1328 21.00 16.00 5.00 368025 TAP 2014 03 30 05 00 00 3189-99 G co CCGG 441.260 -999.990 .X. V4 2014 05 22 14 54 00 36.7376 126.1328 21.00 16.00 5.00 368026 TAP 2014 03 30 05 14 00 1596-99 G co CCGG 428.400 -999.990 .X. V4 2014 05 22 15 10 00 36.7376 126.1328 21.00 16.00 5.00 368021 TAP 2014 03 30 05 14 00 4016-99 G co CCGG 425.670 -999.990 .X. V4 2014 05 22 15 26 00 36.7376 126.1328 21.00 16.00 5.00 368022 TAP 2014 04 06 04 10 00 1383-99 G co CCGG 184.200 -999.990 ... V4 2014 05 21 14 21 00 36.7376 126.1328 21.00 16.00 5.00 368003 TAP 2014 04 06 04 10 00 3557-99 G co CCGG 184.780 -999.990 ... V4 2014 05 21 14 38 00 36.7376 126.1328 21.00 16.00 5.00 368004 TAP 2014 04 06 04 25 00 3739-99 G co CCGG 185.970 -999.990 ... V4 2014 05 21 14 54 00 36.7376 126.1328 21.00 16.00 5.00 368007 TAP 2014 04 06 04 25 00 4039-99 G co CCGG 185.070 -999.990 ... V4 2014 05 21 15 10 00 36.7376 126.1328 21.00 16.00 5.00 368008 TAP 2014 04 14 05 24 00 228-99 G co CCGG 288.310 -999.990 ... V4 2014 05 23 09 18 00 36.7376 126.1328 21.00 16.00 5.00 368037 TAP 2014 04 14 05 24 00 5084-99 G co CCGG 287.990 -999.990 ... V4 2014 05 23 09 34 00 36.7376 126.1328 21.00 16.00 5.00 368038 TAP 2014 04 14 05 38 00 1030-99 G co CCGG 280.750 -999.990 ... V4 2014 05 23 09 50 00 36.7376 126.1328 21.00 16.00 5.00 368035 TAP 2014 04 14 05 38 00 4620-99 G co CCGG 280.270 -999.990 ... V4 2014 05 23 10 06 00 36.7376 126.1328 21.00 16.00 5.00 368036 TAP 2014 04 30 08 30 00 1273-99 G co CCGG 219.010 -999.990 N.. V4 2014 06 17 13 23 00 36.7376 126.1328 21.00 16.00 5.00 368689 TAP 2014 04 30 08 30 00 1372-99 G co CCGG 196.960 -999.990 ... V4 2014 06 17 13 39 00 36.7376 126.1328 21.00 16.00 5.00 368690 TAP 2014 04 30 08 45 00 4284-99 G co CCGG 187.480 -999.990 ... V4 2014 06 17 13 55 00 36.7376 126.1328 21.00 16.00 5.00 368691 TAP 2014 04 30 08 45 00 4331-99 G co CCGG 185.230 -999.990 ... V4 2014 06 17 14 11 00 36.7376 126.1328 21.00 16.00 5.00 368692 TAP 2014 05 09 08 00 00 1598-99 G co CCGG 279.910 -999.990 ... V4 2014 06 16 12 43 00 36.7376 126.1328 21.00 16.00 5.00 368723 TAP 2014 05 09 08 00 00 2425-99 G co CCGG 278.100 -999.990 ... V4 2014 06 16 12 59 00 36.7376 126.1328 21.00 16.00 5.00 368724 TAP 2014 05 09 08 15 00 2710-99 G co CCGG 279.410 -999.990 +.. V4 2014 06 16 13 15 00 36.7376 126.1328 21.00 16.00 5.00 368721 TAP 2014 05 09 08 15 00 4119-99 G co CCGG 274.450 -999.990 -.. V4 2014 06 16 13 31 00 36.7376 126.1328 21.00 16.00 5.00 368722 TAP 2014 05 13 09 30 00 4034-99 G co CCGG 547.810 -999.990 .X. V4 2014 06 11 15 35 00 36.7376 126.1328 21.00 16.00 5.00 368704 TAP 2014 05 13 09 30 00 576-99 G co CCGG 546.190 -999.990 .X. V4 2014 06 11 15 19 00 36.7376 126.1328 21.00 16.00 5.00 368703 TAP 2014 05 28 06 13 00 3549-99 G co CCGG 419.390 -999.990 .X. V4 2014 07 21 11 19 00 36.7376 126.1328 21.00 16.00 5.00 370571 TAP 2014 05 28 06 13 00 3860-99 G co CCGG 417.880 -999.990 .X. V4 2014 07 21 11 03 00 36.7376 126.1328 21.00 16.00 5.00 370570 TAP 2014 05 28 06 35 00 1294-99 G co CCGG 427.320 -999.990 .X. V4 2014 07 21 11 51 00 36.7376 126.1328 21.00 16.00 5.00 370575 TAP 2014 05 28 06 35 00 4391-99 G co CCGG 428.030 -999.990 .X. V4 2014 07 21 11 35 00 36.7376 126.1328 21.00 16.00 5.00 370574 TAP 2014 06 04 06 04 00 421-99 G co CCGG 137.690 -999.990 ... V4 2014 07 21 10 31 00 36.7376 126.1328 21.00 16.00 5.00 370582 TAP 2014 06 04 06 04 00 422-99 G co CCGG 137.920 -999.990 ... V4 2014 07 21 10 47 00 36.7376 126.1328 21.00 16.00 5.00 370583 TAP 2014 06 04 06 20 00 4047-99 G co CCGG 140.670 -999.990 ... V4 2014 07 18 16 19 00 36.7376 126.1328 21.00 16.00 5.00 370584 TAP 2014 06 04 06 20 00 4048-99 G co CCGG 138.230 -999.990 ... V4 2014 07 18 16 35 00 36.7376 126.1328 21.00 16.00 5.00 370585 TAP 2014 06 11 06 24 00 2571-99 G co CCGG 211.500 -999.990 ... V4 2014 07 21 12 39 00 36.7376 126.1328 21.00 16.00 5.00 370572 TAP 2014 06 11 06 24 00 2589-99 G co CCGG 213.530 -999.990 ... V4 2014 07 21 12 55 00 36.7376 126.1328 21.00 16.00 5.00 370573 TAP 2014 06 11 06 45 00 3950-99 G co CCGG 198.300 -999.990 ... V4 2014 07 21 12 07 00 36.7376 126.1328 21.00 16.00 5.00 370576 TAP 2014 06 11 06 45 00 523-99 G co CCGG 197.350 -999.990 ... V4 2014 07 21 12 23 00 36.7376 126.1328 21.00 16.00 5.00 370577 TAP 2014 06 18 05 20 00 3093-99 G co CCGG 319.690 -999.990 ... V4 2014 07 24 13 16 00 36.7376 126.1328 21.00 16.00 5.00 370854 TAP 2014 06 18 05 20 00 517-99 G co CCGG 320.430 -999.990 ... V4 2014 07 24 13 00 00 36.7376 126.1328 21.00 16.00 5.00 370853 TAP 2014 06 18 05 38 00 2074-99 G co CCGG 312.550 -999.990 ... V4 2014 07 24 13 33 00 36.7376 126.1328 21.00 16.00 5.00 370851 TAP 2014 06 18 05 38 00 5126-99 G co CCGG 314.790 -999.990 ... V4 2014 07 24 13 49 00 36.7376 126.1328 21.00 16.00 5.00 370852 TAP 2014 07 02 05 08 00 1633-99 G co CCGG -999.990 -999.990 *.. V4 2014 08 25 11 53 00 36.7376 126.1328 21.00 16.00 5.00 372461 TAP 2014 07 02 05 08 00 4280-99 G co CCGG -999.990 -999.990 *.. V4 2014 08 25 12 09 00 36.7376 126.1328 21.00 16.00 5.00 372462 TAP 2014 07 02 05 22 00 2829-99 G co CCGG 209.550 -999.990 ... V4 2014 08 22 14 51 00 36.7376 126.1328 21.00 16.00 5.00 372464 TAP 2014 07 02 05 22 00 3022-99 G co CCGG 207.680 -999.990 ... V4 2014 08 22 14 35 00 36.7376 126.1328 21.00 16.00 5.00 372463 TAP 2014 07 18 07 40 00 2327-99 G co CCGG 79.810 -999.990 ... V4 2014 08 19 16 19 00 36.7376 126.1328 21.00 16.00 5.00 372285 TAP 2014 07 18 07 40 00 2328-99 G co CCGG 80.420 -999.990 ... V4 2014 08 19 16 35 00 36.7376 126.1328 21.00 16.00 5.00 372286 TAP 2014 07 18 07 59 00 5174-99 G co CCGG 86.190 -999.990 ... V4 2014 08 19 15 44 00 36.7376 126.1328 21.00 16.00 5.00 372287 TAP 2014 08 01 03 10 00 2646-99 G co CCGG 110.400 -999.990 ... V4 2014 09 25 13 54 00 36.7376 126.1328 21.00 16.00 5.00 374479 TAP 2014 08 01 03 10 00 4868-99 G co CCGG 109.760 -999.990 ... V4 2014 09 25 14 10 00 36.7376 126.1328 21.00 16.00 5.00 374480 TAP 2014 08 01 03 21 00 1192-99 G co CCGG 123.770 -999.990 ... V4 2014 09 25 14 26 00 36.7376 126.1328 21.00 16.00 5.00 374476 TAP 2014 08 01 03 21 00 2174-99 G co CCGG 124.150 -999.990 ... V4 2014 09 25 14 42 00 36.7376 126.1328 21.00 16.00 5.00 374475 TAP 2014 08 10 04 15 00 4611-99 G co CCGG 264.050 -999.990 ... V4 2014 10 03 11 16 00 36.7376 126.1328 21.00 16.00 5.00 374872 TAP 2014 08 10 04 15 00 4612-99 G co CCGG 265.590 -999.990 ... V4 2014 10 03 11 32 00 36.7376 126.1328 21.00 16.00 5.00 374873 TAP 2014 08 10 04 28 00 2711-99 G co CCGG 270.690 -999.990 ... V4 2014 10 03 13 56 00 36.7376 126.1328 21.00 16.00 5.00 374858 TAP 2014 08 10 04 28 00 2712-99 G co CCGG 269.250 -999.990 ... V4 2014 10 03 14 12 00 36.7376 126.1328 21.00 16.00 5.00 374859 TAP 2014 08 22 06 37 00 282-99 G co CCGG 404.420 -999.990 .X. V4 2014 09 25 15 30 00 36.7376 126.1328 21.00 16.00 5.00 374481 TAP 2014 08 22 06 37 00 2902-99 G co CCGG 404.190 -999.990 .X. V4 2014 09 25 15 46 00 36.7376 126.1328 21.00 16.00 5.00 374482 TAP 2014 08 22 06 51 00 1068-99 G co CCGG 441.920 -999.990 N.. V4 2014 09 25 14 58 00 36.7376 126.1328 21.00 16.00 5.00 374477 TAP 2014 08 22 06 51 00 4372-99 G co CCGG 432.280 -999.990 N.. V4 2014 09 25 15 14 00 36.7376 126.1328 21.00 16.00 5.00 374478 TAP 2014 08 29 04 48 00 3876-99 G co CCGG 361.270 -999.990 N.. V4 2014 10 03 10 44 00 36.7376 126.1328 21.00 16.00 5.00 374870 TAP 2014 08 29 04 48 00 4691-99 G co CCGG 357.110 -999.990 N.. V4 2014 10 03 11 00 00 36.7376 126.1328 21.00 16.00 5.00 374871 TAP 2014 08 29 08 51 00 191-99 G co CCGG 266.770 -999.990 ... V4 2014 10 03 10 12 00 36.7376 126.1328 21.00 16.00 5.00 374868 TAP 2014 08 29 08 51 00 3777-99 G co CCGG 266.440 -999.990 ... V4 2014 10 03 10 28 00 36.7376 126.1328 21.00 16.00 5.00 374869 TAP 2014 09 05 08 03 00 1346-99 G co CCGG 164.110 -999.990 ... V4 2014 12 23 10 52 00 36.7376 126.1328 21.00 16.00 5.00 378885 TAP 2014 09 05 08 03 00 2346-99 G co CCGG 165.580 -999.990 ... V4 2014 12 23 11 08 00 36.7376 126.1328 21.00 16.00 5.00 378886 TAP 2014 09 05 08 17 00 484-99 G co CCGG 167.600 -999.990 ... V4 2014 12 23 09 48 00 36.7376 126.1328 21.00 16.00 5.00 378887 TAP 2014 09 05 08 17 00 4840-99 G co CCGG 165.830 -999.990 ... V4 2014 12 23 10 04 00 36.7376 126.1328 21.00 16.00 5.00 378888 TAP 2014 09 11 05 50 00 3084-99 G co CCGG 878.250 -999.990 N.. V4 2014 12 30 14 23 00 36.7376 126.1328 21.00 16.00 5.00 379021 TAP 2014 09 11 05 50 00 3736-99 G co CCGG 780.510 -999.990 N.. V4 2014 12 30 14 39 00 36.7376 126.1328 21.00 16.00 5.00 379022 TAP 2014 09 11 06 04 00 1510-99 G co CCGG 561.950 -999.990 N.. V4 2014 12 30 14 55 00 36.7376 126.1328 21.00 16.00 5.00 379019 TAP 2014 09 11 06 04 00 1974-99 G co CCGG 593.200 -999.990 N.. V4 2014 12 30 15 11 00 36.7376 126.1328 21.00 16.00 5.00 379020 TAP 2014 09 19 04 35 00 3722-99 G co CCGG 160.920 -999.990 ... V4 2014 12 30 15 27 00 36.7376 126.1328 21.00 16.00 5.00 379015 TAP 2014 09 19 04 35 00 5113-99 G co CCGG 161.550 -999.990 ... V4 2014 12 30 15 43 00 36.7376 126.1328 21.00 16.00 5.00 379016 TAP 2014 09 19 04 49 00 1338-99 G co CCGG 164.570 -999.990 ... V4 2014 12 30 15 59 00 36.7376 126.1328 21.00 16.00 5.00 379017 TAP 2014 09 19 04 49 00 4356-99 G co CCGG 166.340 -999.990 ... V4 2014 12 30 16 15 00 36.7376 126.1328 21.00 16.00 5.00 379018 TAP 2014 09 26 05 17 00 2805-99 G co CCGG 272.320 -999.990 ... V4 2014 12 30 17 03 00 36.7376 126.1328 21.00 16.00 5.00 379277 TAP 2014 09 26 05 17 00 2806-99 G co CCGG 271.870 -999.990 ... V4 2014 12 30 17 19 00 36.7376 126.1328 21.00 16.00 5.00 379278 TAP 2014 09 26 05 31 00 4477-99 G co CCGG 283.780 -999.990 ... V4 2014 12 30 16 31 00 36.7376 126.1328 21.00 16.00 5.00 379281 TAP 2014 09 26 05 31 00 4478-99 G co CCGG 282.410 -999.990 ... V4 2014 12 30 16 47 00 36.7376 126.1328 21.00 16.00 5.00 379282 TAP 2014 10 01 05 00 00 2778-99 G co CCGG 234.560 -999.990 ... V4 2015 01 05 16 30 00 36.7376 126.1328 21.00 16.00 5.00 379290 TAP 2014 10 01 05 00 00 581-99 G co CCGG 234.110 -999.990 ... V4 2015 01 05 16 14 00 36.7376 126.1328 21.00 16.00 5.00 379289 TAP 2014 10 01 05 14 00 1116-99 G co CCGG 235.640 -999.990 ... V4 2015 01 05 16 46 00 36.7376 126.1328 21.00 16.00 5.00 379285 TAP 2014 10 01 05 14 00 3917-99 G co CCGG 234.510 -999.990 ... V4 2015 01 05 17 02 00 36.7376 126.1328 21.00 16.00 5.00 379286 TAP 2014 10 07 06 38 00 1042-99 G co CCGG 202.530 -999.990 ... V4 2015 01 09 12 04 00 36.7376 126.1328 21.00 16.00 5.00 379620 TAP 2014 10 07 06 38 00 4869-99 G co CCGG 202.510 -999.990 ... V4 2015 01 09 12 20 00 36.7376 126.1328 21.00 16.00 5.00 379621 TAP 2014 10 07 06 52 00 2604-99 G co CCGG 205.000 -999.990 ... V4 2015 01 09 13 40 00 36.7376 126.1328 21.00 16.00 5.00 379622 TAP 2014 10 07 06 52 00 4693-99 G co CCGG 203.500 -999.990 ... V4 2015 01 09 13 56 00 36.7376 126.1328 21.00 16.00 5.00 379623 TAP 2014 10 12 05 11 00 1615-99 G co CCGG 173.490 -999.990 ... V4 2015 01 06 09 35 00 36.7376 126.1328 21.00 16.00 5.00 379291 TAP 2014 10 12 05 11 00 2353-99 G co CCGG 175.650 -999.990 ... V4 2015 01 06 09 51 00 36.7376 126.1328 21.00 16.00 5.00 379292 TAP 2014 10 12 05 25 00 3386-99 G co CCGG 205.100 -999.990 ... V4 2015 01 06 10 23 00 36.7376 126.1328 21.00 16.00 5.00 379288 TAP 2014 10 12 05 25 00 3859-99 G co CCGG 206.480 -999.990 ... V4 2015 01 06 10 07 00 36.7376 126.1328 21.00 16.00 5.00 379287 TAP 2014 10 14 05 02 00 4762-99 G co CCGG 159.260 -999.990 ... V4 2015 01 06 09 03 00 36.7376 126.1328 21.00 16.00 5.00 379303 TAP 2014 10 14 05 02 00 5064-99 G co CCGG 158.800 -999.990 ... V4 2015 01 06 09 19 00 36.7376 126.1328 21.00 16.00 5.00 379304 TAP 2014 10 14 05 17 00 3427-99 G co CCGG 168.380 -999.990 ... V4 2015 01 06 10 39 00 36.7376 126.1328 21.00 16.00 5.00 379305 TAP 2014 10 14 05 17 00 5296-99 G co CCGG 168.470 -999.990 ... V4 2015 01 06 10 55 00 36.7376 126.1328 21.00 16.00 5.00 379306 TAP 2014 10 22 07 43 00 4338-99 G co CCGG 285.510 -999.990 ... V4 2015 01 09 13 08 00 36.7376 126.1328 21.00 16.00 5.00 379604 TAP 2014 10 22 07 43 00 4668-99 G co CCGG 287.080 -999.990 ... V4 2015 01 09 13 24 00 36.7376 126.1328 21.00 16.00 5.00 379605 TAP 2014 10 22 07 58 00 1817-99 G co CCGG 275.200 -999.990 ... V4 2015 01 09 12 36 00 36.7376 126.1328 21.00 16.00 5.00 379606 TAP 2014 10 22 07 58 00 2461-99 G co CCGG 274.260 -999.990 ... V4 2015 01 09 12 52 00 36.7376 126.1328 21.00 16.00 5.00 379607 TAP 2014 10 27 04 00 00 2491-99 G co CCGG 214.960 -999.990 ... V4 2015 01 02 16 31 00 36.7376 126.1328 21.00 16.00 5.00 379275 TAP 2014 10 27 04 00 00 4833-99 G co CCGG 214.550 -999.990 ... V4 2015 01 02 16 47 00 36.7376 126.1328 21.00 16.00 5.00 379276 TAP 2014 10 27 04 14 00 3118-99 G co CCGG 213.970 -999.990 ... V4 2015 01 02 15 59 00 36.7376 126.1328 21.00 16.00 5.00 379271 TAP 2014 10 27 04 14 00 3823-99 G co CCGG 213.600 -999.990 ... V4 2015 01 02 16 15 00 36.7376 126.1328 21.00 16.00 5.00 379272 TAP 2014 11 03 05 58 00 717-99 G co CCGG 131.890 -999.990 ... V4 2015 01 02 15 27 00 36.7376 126.1328 21.00 16.00 5.00 379269 TAP 2014 11 03 05 58 00 718-99 G co CCGG 132.080 -999.990 ... V4 2015 01 02 15 43 00 36.7376 126.1328 21.00 16.00 5.00 379270 TAP 2014 11 03 06 12 00 4025-99 G co CCGG 131.590 -999.990 ... V4 2015 01 02 13 19 00 36.7376 126.1328 21.00 16.00 5.00 379273 TAP 2014 11 03 06 12 00 4026-99 G co CCGG 131.200 -999.990 ... V4 2015 01 02 13 35 00 36.7376 126.1328 21.00 16.00 5.00 379274 TAP 2014 11 13 05 55 00 1438-99 G co CCGG 131.710 -999.990 ... V4 2014 12 31 11 18 00 36.7376 126.1328 21.00 16.00 5.00 379283 TAP 2014 11 13 05 55 00 5423-99 G co CCGG 131.980 -999.990 ... V4 2014 12 31 11 34 00 36.7376 126.1328 21.00 16.00 5.00 379284 TAP 2014 11 13 06 09 00 1869-99 G co CCGG 134.010 -999.990 ... V4 2014 12 31 11 50 00 36.7376 126.1328 21.00 16.00 5.00 379279 TAP 2014 11 13 06 09 00 2464-99 G co CCGG 132.670 -999.990 ... V4 2014 12 31 12 06 00 36.7376 126.1328 21.00 16.00 5.00 379280 TAP 2014 11 26 04 53 00 2722-99 G co CCGG 237.990 -999.990 ... V4 2015 01 29 12 12 00 36.7376 126.1328 21.00 16.00 5.00 380177 TAP 2014 11 26 04 53 00 937-99 G co CCGG 237.820 -999.990 ... V4 2015 01 29 11 56 00 36.7376 126.1328 21.00 16.00 5.00 380178 TAP 2014 11 26 05 12 00 172-99 G co CCGG 240.680 -999.990 ... V4 2015 01 29 14 39 00 36.7376 126.1328 21.00 16.00 5.00 380175 TAP 2014 11 26 05 12 00 4522-99 G co CCGG 241.730 -999.990 ... V4 2015 01 29 14 55 00 36.7376 126.1328 21.00 16.00 5.00 380176 TAP 2014 12 11 05 19 00 2990-99 G co CCGG 208.610 -999.990 ... V4 2015 02 02 15 53 00 36.7376 126.1328 21.00 16.00 5.00 380393 TAP 2014 12 11 05 19 00 4184-99 G co CCGG 209.050 -999.990 ... V4 2015 02 02 16 09 00 36.7376 126.1328 21.00 16.00 5.00 380394 TAP 2014 12 11 05 25 00 1197-99 G co CCGG 208.540 -999.990 ... V4 2015 02 02 16 25 00 36.7376 126.1328 21.00 16.00 5.00 380391 TAP 2014 12 11 05 25 00 4715-99 G co CCGG 208.780 -999.990 ... V4 2015 02 02 16 41 00 36.7376 126.1328 21.00 16.00 5.00 380392 TAP 2015 01 02 06 47 00 4096-99 G co CCGG 224.510 -999.990 +.. V4 2015 02 24 14 47 00 36.7376 126.1328 21.00 16.00 5.00 381617 TAP 2015 01 02 06 47 00 4285-99 G co CCGG 220.990 -999.990 -.. V4 2015 02 24 15 03 00 36.7376 126.1328 21.00 16.00 5.00 381618 TAP 2015 01 02 07 02 00 3710-99 G co CCGG 224.670 -999.990 ... V4 2015 02 24 15 19 00 36.7376 126.1328 21.00 16.00 5.00 381619 TAP 2015 01 02 07 02 00 4073-99 G co CCGG 224.880 -999.990 ... V4 2015 02 24 15 35 00 36.7376 126.1328 21.00 16.00 5.00 381620 TAP 2015 01 07 07 22 00 1585-99 G co CCGG 188.790 -999.990 ... V4 2015 02 19 11 16 00 36.7376 126.1328 21.00 16.00 5.00 381412 TAP 2015 01 07 07 22 00 689-99 G co CCGG 189.590 -999.990 ... V4 2015 02 19 11 00 00 36.7376 126.1328 21.00 16.00 5.00 381413 TAP 2015 01 07 07 35 00 3310-99 G co CCGG 186.350 -999.990 ... V4 2015 02 19 10 28 00 36.7376 126.1328 21.00 16.00 5.00 381408 TAP 2015 01 07 07 35 00 5274-99 G co CCGG 187.200 -999.990 ... V4 2015 02 19 10 44 00 36.7376 126.1328 21.00 16.00 5.00 381409 TAP 2015 01 24 06 17 00 4768-99 G co CCGG 297.310 -999.990 ... V4 2015 03 17 11 17 00 36.7376 126.1328 21.00 16.00 5.00 382476 TAP 2015 01 24 06 17 00 5326-99 G co CCGG 295.120 -999.990 ... V4 2015 03 17 11 33 00 36.7376 126.1328 21.00 16.00 5.00 382477 TAP 2015 01 24 06 31 00 2492-99 G co CCGG 300.970 -999.990 ... V4 2015 03 17 10 14 00 36.7376 126.1328 21.00 16.00 5.00 382474 TAP 2015 01 24 06 31 00 3168-99 G co CCGG 301.200 -999.990 ... V4 2015 03 17 10 30 00 36.7376 126.1328 21.00 16.00 5.00 382475 TAP 2015 01 27 07 30 00 5203-99 G co CCGG 181.920 -999.990 ... V4 2015 03 17 11 02 00 36.7376 126.1328 21.00 16.00 5.00 382478 TAP 2015 01 27 07 30 00 651-99 G co CCGG 180.450 -999.990 ... V4 2015 03 17 10 46 00 36.7376 126.1328 21.00 16.00 5.00 382479 TAP 2015 01 27 07 44 00 128-99 G co CCGG 182.230 -999.990 ... V4 2015 03 17 15 01 00 36.7376 126.1328 21.00 16.00 5.00 382472 TAP 2015 01 27 07 44 00 301-99 G co CCGG 182.280 -999.990 ... V4 2015 03 17 15 16 00 36.7376 126.1328 21.00 16.00 5.00 382473 TAP 2015 01 31 07 00 00 14-99 G co CCGG 242.270 -999.990 ... V4 2015 04 28 13 47 00 36.7376 126.1328 21.00 16.00 5.00 385293 TAP 2015 01 31 07 00 00 3190-99 G co CCGG 243.840 -999.990 ... V4 2015 04 28 14 03 00 36.7376 126.1328 21.00 16.00 5.00 385294 TAP 2015 01 31 07 18 00 3012-99 G co CCGG 240.430 -999.990 ... V4 2015 04 28 13 16 00 36.7376 126.1328 21.00 16.00 5.00 385291 TAP 2015 01 31 07 18 00 4956-99 G co CCGG 241.050 -999.990 ... V4 2015 04 28 13 32 00 36.7376 126.1328 21.00 16.00 5.00 385292 TAP 2015 02 07 07 16 00 1392-99 G co CCGG 234.560 -999.990 ... V4 2015 04 28 08 29 00 36.7376 126.1328 21.00 16.00 5.00 385314 TAP 2015 02 07 07 16 00 4790-99 G co CCGG 234.170 -999.990 ... V4 2015 04 28 08 45 00 36.7376 126.1328 21.00 16.00 5.00 385315 TAP 2015 02 07 07 29 00 1073-99 G co CCGG 254.140 -999.990 ... V4 2015 04 28 10 37 00 36.7376 126.1328 21.00 16.00 5.00 385320 TAP 2015 02 07 07 29 00 2526-99 G co CCGG 252.100 -999.990 ... V4 2015 04 28 10 53 00 36.7376 126.1328 21.00 16.00 5.00 385321 TAP 2015 02 12 07 34 00 2199-99 G co CCGG 225.040 -999.990 ... V4 2015 04 28 14 19 00 36.7376 126.1328 21.00 16.00 5.00 385297 TAP 2015 02 12 07 34 00 3803-99 G co CCGG 224.820 -999.990 ... V4 2015 04 28 14 35 00 36.7376 126.1328 21.00 16.00 5.00 385298 TAP 2015 02 12 07 48 00 2429-99 G co CCGG 229.530 -999.990 ... V4 2015 04 28 14 51 00 36.7376 126.1328 21.00 16.00 5.00 385295 TAP 2015 02 12 07 48 00 5101-99 G co CCGG 228.280 -999.990 ... V4 2015 04 28 15 07 00 36.7376 126.1328 21.00 16.00 5.00 385296 TAP 2015 03 04 07 38 00 3735-99 G co CCGG 214.870 -999.990 ... V4 2015 06 29 12 36 00 36.7376 126.1328 21.00 16.00 5.00 388204 TAP 2015 03 04 07 38 00 3926-99 G co CCGG 215.690 -999.990 ... V4 2015 06 29 12 52 00 36.7376 126.1328 21.00 16.00 5.00 388205 TAP 2015 03 04 07 52 00 3367-99 G co CCGG 213.130 -999.990 ... V4 2015 07 10 11 38 00 36.7376 126.1328 21.00 16.00 5.00 388201 TAP 2015 03 09 07 37 00 468-99 G co CCGG 201.870 -999.990 ... V4 2015 04 28 11 09 00 36.7376 126.1328 21.00 16.00 5.00 385316 TAP 2015 03 09 07 37 00 5084-99 G co CCGG 201.510 -999.990 ... V4 2015 04 28 11 25 00 36.7376 126.1328 21.00 16.00 5.00 385317 TAP 2015 03 09 07 52 00 1306-99 G co CCGG 187.190 -999.990 ... V4 2015 04 28 11 40 00 36.7376 126.1328 21.00 16.00 5.00 385318 TAP 2015 03 09 07 52 00 3757-99 G co CCGG 187.550 -999.990 ... V4 2015 04 28 11 56 00 36.7376 126.1328 21.00 16.00 5.00 385319 TAP 2015 03 23 07 00 00 3543-99 G co CCGG 318.910 -999.990 N.. V4 2015 04 30 11 45 00 36.7376 126.1328 21.00 16.00 5.00 385307 TAP 2015 03 23 07 00 00 947-99 G co CCGG 324.770 -999.990 N.. V4 2015 04 30 11 30 00 36.7376 126.1328 21.00 16.00 5.00 385306 TAP 2015 03 23 07 14 00 1588-99 G co CCGG 324.870 -999.990 +.. V4 2015 04 30 10 58 00 36.7376 126.1328 21.00 16.00 5.00 385308 TAP 2015 03 23 07 14 00 1613-99 G co CCGG 321.500 -999.990 -.. V4 2015 04 30 11 14 00 36.7376 126.1328 21.00 16.00 5.00 385309 TAP 2015 04 04 01 55 00 51-99 G co CCGG 253.110 -999.990 ... V4 2015 06 02 16 35 00 36.7376 126.1328 21.00 16.00 5.00 386908 TAP 2015 04 04 01 55 00 975-99 G co CCGG 249.030 -999.990 ... V4 2015 06 02 16 51 00 36.7376 126.1328 21.00 16.00 5.00 386909 TAP 2015 04 04 02 08 00 2465-99 G co CCGG 246.930 -999.990 ... V4 2015 06 02 16 03 00 36.7376 126.1328 21.00 16.00 5.00 386904 TAP 2015 04 04 02 08 00 3654-99 G co CCGG 275.360 -999.990 N.. V4 2015 06 02 16 19 00 36.7376 126.1328 21.00 16.00 5.00 386905 TAP 2015 04 08 04 41 00 4643-99 G co CCGG 242.730 -999.990 N.. V4 2015 06 02 13 25 00 36.7376 126.1328 21.00 16.00 5.00 386910 TAP 2015 04 08 04 41 00 4734-99 G co CCGG 247.710 -999.990 N.. V4 2015 06 02 13 41 00 36.7376 126.1328 21.00 16.00 5.00 386911 TAP 2015 04 08 04 55 00 1788-99 G co CCGG 253.500 -999.990 ... V4 2015 06 02 12 53 00 36.7376 126.1328 21.00 16.00 5.00 386912 TAP 2015 04 08 04 55 00 2855-99 G co CCGG 254.340 -999.990 ... V4 2015 06 02 13 09 00 36.7376 126.1328 21.00 16.00 5.00 386913 TAP 2015 04 20 07 47 00 2430-99 G co CCGG 280.750 -999.990 ... V4 2015 06 02 15 16 00 36.7376 126.1328 21.00 16.00 5.00 386907 TAP 2015 04 20 07 47 00 553-99 G co CCGG 282.720 -999.990 ... V4 2015 06 02 15 00 00 36.7376 126.1328 21.00 16.00 5.00 386906 TAP 2015 04 20 08 00 00 2523-99 G co CCGG 266.310 -999.990 ... V4 2015 06 02 15 31 00 36.7376 126.1328 21.00 16.00 5.00 386902 TAP 2015 04 20 08 00 00 3595-99 G co CCGG 262.850 -999.990 ... V4 2015 06 02 15 47 00 36.7376 126.1328 21.00 16.00 5.00 386903 TAP 2015 04 25 08 30 00 1547-99 G co CCGG 319.630 -999.990 ... V4 2015 06 26 08 38 00 36.7376 126.1328 21.00 16.00 5.00 387954 TAP 2015 04 25 08 30 00 2371-99 G co CCGG 321.890 -999.990 ... V4 2015 06 26 08 54 00 36.7376 126.1328 21.00 16.00 5.00 387955 TAP 2015 04 25 08 46 00 2281-99 G co CCGG 312.820 -999.990 ... V4 2015 06 18 16 56 00 36.7376 126.1328 21.00 16.00 5.00 387952 TAP 2015 04 25 08 46 00 3794-99 G co CCGG 312.910 -999.990 ... V4 2015 06 18 17 11 00 36.7376 126.1328 21.00 16.00 5.00 387953 TAP 2015 05 04 05 36 00 3165-99 G co CCGG 209.480 -999.990 ... V4 2015 06 19 14 48 00 36.7376 126.1328 21.00 16.00 5.00 388025 TAP 2015 05 04 05 36 00 4867-99 G co CCGG 208.110 -999.990 ... V4 2015 06 19 15 04 00 36.7376 126.1328 21.00 16.00 5.00 388026 TAP 2015 05 04 05 50 00 1413-99 G co CCGG 199.520 -999.990 ... V4 2015 06 19 15 20 00 36.7376 126.1328 21.00 16.00 5.00 388027 TAP 2015 05 04 05 50 00 4765-99 G co CCGG 200.750 -999.990 ... V4 2015 06 19 15 35 00 36.7376 126.1328 21.00 16.00 5.00 388028 TAP 2015 05 10 06 20 00 1033-99 G co CCGG 236.590 -999.990 ... V4 2015 06 29 13 39 00 36.7376 126.1328 21.00 16.00 5.00 388206 TAP 2015 05 10 06 20 00 5149-99 G co CCGG 237.740 -999.990 ... V4 2015 06 29 13 55 00 36.7376 126.1328 21.00 16.00 5.00 388207 TAP 2015 05 10 06 37 00 1315-99 G co CCGG 238.430 -999.990 ... V4 2015 06 29 13 24 00 36.7376 126.1328 21.00 16.00 5.00 388203 TAP 2015 05 10 06 37 00 976-99 G co CCGG 238.840 -999.990 ... V4 2015 06 29 13 08 00 36.7376 126.1328 21.00 16.00 5.00 388202 TAP 2015 05 17 05 16 00 2929-99 G co CCGG 389.750 -999.990 ... V4 2015 07 17 13 38 00 36.7376 126.1328 21.00 16.00 5.00 389469 TAP 2015 05 17 05 16 00 4202-99 G co CCGG 388.780 -999.990 ... V4 2015 07 17 13 54 00 36.7376 126.1328 21.00 16.00 5.00 389470 TAP 2015 05 17 05 30 00 3189-99 G co CCGG 383.930 -999.990 ... V4 2015 07 17 14 09 00 36.7376 126.1328 21.00 16.00 5.00 389473 TAP 2015 05 17 05 30 00 3572-99 G co CCGG 382.460 -999.990 ... V4 2015 07 17 14 25 00 36.7376 126.1328 21.00 16.00 5.00 389474 TAP 2015 05 21 05 20 00 1457-99 G co CCGG 204.360 -999.990 ... V4 2015 07 16 16 31 00 36.7376 126.1328 21.00 16.00 5.00 389471 TAP 2015 05 21 05 20 00 2628-99 G co CCGG 205.450 -999.990 ... V4 2015 07 16 16 46 00 36.7376 126.1328 21.00 16.00 5.00 389472 TAP 2015 05 21 05 34 00 3909-99 G co CCGG 201.000 -999.990 ... V4 2015 07 16 15 59 00 36.7376 126.1328 21.00 16.00 5.00 389467 TAP 2015 05 21 05 34 00 5306-99 G co CCGG 201.270 -999.990 ... V4 2015 07 16 16 15 00 36.7376 126.1328 21.00 16.00 5.00 389468 TAP 2015 05 23 06 50 00 1847-99 G co CCGG 206.210 -999.990 +.. V4 2015 07 16 10 42 00 36.7376 126.1328 21.00 16.00 5.00 389439 TAP 2015 05 23 06 50 00 3611-99 G co CCGG 195.860 -999.990 -.. V4 2015 07 16 10 58 00 36.7376 126.1328 21.00 16.00 5.00 389440 TAP 2015 05 27 06 36 00 3312-99 G co CCGG 208.570 -999.990 N.. V4 2015 07 16 11 14 00 36.7376 126.1328 21.00 16.00 5.00 389437 TAP 2015 05 27 06 36 00 3500-99 G co CCGG 202.080 -999.990 N.. V4 2015 07 16 11 30 00 36.7376 126.1328 21.00 16.00 5.00 389438 TAP 2015 06 04 06 10 00 1329-99 G co CCGG 1243.700 -999.990 .XC V4 2015 07 29 09 55 00 36.7376 126.1328 21.00 16.00 5.00 390066 TAP 2015 06 04 06 10 00 1330-99 G co CCGG 1244.580 -999.990 .XC V4 2015 07 29 10 11 00 36.7376 126.1328 21.00 16.00 5.00 390067 TAP 2015 06 04 06 23 00 757-99 G co CCGG 1261.540 -999.990 .XC V4 2015 07 29 10 27 00 36.7376 126.1328 21.00 16.00 5.00 390069 TAP 2015 06 04 06 23 00 758-99 G co CCGG 1261.780 -999.990 .XC V4 2015 07 29 10 43 00 36.7376 126.1328 21.00 16.00 5.00 390068 TAP 2015 06 15 05 21 00 1218-99 G co CCGG 264.300 -999.990 ... V4 2015 07 29 16 58 00 36.7376 126.1328 21.00 16.00 5.00 390074 TAP 2015 06 15 05 21 00 4148-99 G co CCGG 263.470 -999.990 ... V4 2015 07 29 17 13 00 36.7376 126.1328 21.00 16.00 5.00 390075 TAP 2015 06 15 05 36 00 3526-99 G co CCGG 267.110 -999.990 ... V4 2015 07 30 12 09 00 36.7376 126.1328 21.00 16.00 5.00 390076 TAP 2015 06 15 05 36 00 4051-99 G co CCGG 270.100 -999.990 ... V4 2015 07 30 12 24 00 36.7376 126.1328 21.00 16.00 5.00 390077 TAP 2015 06 23 08 42 00 4104-99 G co CCGG 229.790 -999.990 ... V4 2015 08 12 10 25 00 36.7376 126.1328 21.00 16.00 5.00 391061 TAP 2015 06 23 08 42 00 4968-99 G co CCGG 230.630 -999.990 ... V4 2015 08 12 10 41 00 36.7376 126.1328 21.00 16.00 5.00 391062 TAP 2015 06 23 08 56 00 3534-99 G co CCGG 236.780 -999.990 ... V4 2015 08 12 12 33 00 36.7376 126.1328 21.00 16.00 5.00 391065 TAP 2015 06 23 08 56 00 4003-99 G co CCGG 234.700 -999.990 ... V4 2015 08 12 12 49 00 36.7376 126.1328 21.00 16.00 5.00 391066 TAP 2015 06 28 07 16 00 545-99 G co CCGG 253.890 -999.990 -.. V4 2015 08 12 13 05 00 36.7376 126.1328 21.00 16.00 5.00 391063 TAP 2015 06 28 07 16 00 836-99 G co CCGG 258.050 -999.990 +.. V4 2015 08 12 13 21 00 36.7376 126.1328 21.00 16.00 5.00 391064 TAP 2015 06 28 07 29 00 3043-99 G co CCGG 254.090 -999.990 ... V4 2015 08 12 13 52 00 36.7376 126.1328 21.00 16.00 5.00 391068 TAP 2015 06 28 07 29 00 618-99 G co CCGG 256.140 -999.990 ... V4 2015 08 12 13 36 00 36.7376 126.1328 21.00 16.00 5.00 391067 TAP 2015 07 05 04 32 00 4632-99 G co CCGG 183.780 -999.990 ... V4 2015 08 14 15 25 00 36.7376 126.1328 21.00 16.00 5.00 391354 TAP 2015 07 05 04 32 00 464-99 G co CCGG 184.210 -999.990 ... V4 2015 08 14 15 09 00 36.7376 126.1328 21.00 16.00 5.00 391353 TAP 2015 07 05 04 44 00 1428-99 G co CCGG 173.260 -999.990 ... V4 2015 08 14 14 37 00 36.7376 126.1328 21.00 16.00 5.00 391351 TAP 2015 07 05 04 44 00 5323-99 G co CCGG 171.170 -999.990 ... V4 2015 08 14 14 53 00 36.7376 126.1328 21.00 16.00 5.00 391352 TAP 2015 07 08 05 20 00 5281-99 G co CCGG 171.290 -999.990 ... V4 2015 08 17 10 54 00 36.7376 126.1328 21.00 16.00 5.00 391339 TAP 2015 07 08 05 20 00 5413-99 G co CCGG 171.440 -999.990 ... V4 2015 08 17 11 09 00 36.7376 126.1328 21.00 16.00 5.00 391340 TAP 2015 07 08 05 35 00 5102-99 G co CCGG 173.510 -999.990 ... V4 2015 08 14 15 56 00 36.7376 126.1328 21.00 16.00 5.00 391331 TAP 2015 07 08 05 35 00 832-99 G co CCGG 172.170 -999.990 ... V4 2015 08 14 15 40 00 36.7376 126.1328 21.00 16.00 5.00 391332 TAP 2015 07 16 05 42 00 1487-99 G co CCGG 161.560 -999.990 ... V4 2015 09 14 12 44 00 36.7376 126.1328 21.00 16.00 5.00 393292 TAP 2015 07 16 05 42 00 1497-99 G co CCGG 163.460 -999.990 ... V4 2015 09 14 13 00 00 36.7376 126.1328 21.00 16.00 5.00 393293 TAP 2015 07 16 05 59 00 1569-99 G co CCGG 158.210 -999.990 ... V4 2015 09 14 12 28 00 36.7376 126.1328 21.00 16.00 5.00 393290 TAP 2015 07 16 05 59 00 974-99 G co CCGG 159.350 -999.990 ... V4 2015 09 14 12 12 00 36.7376 126.1328 21.00 16.00 5.00 393291 TAP 2015 07 22 07 26 00 1310-99 G co CCGG 247.530 -999.990 ... V4 2015 09 15 12 47 00 36.7376 126.1328 21.00 16.00 5.00 393488 TAP 2015 07 22 07 26 00 2578-99 G co CCGG 245.270 -999.990 ... V4 2015 09 15 13 03 00 36.7376 126.1328 21.00 16.00 5.00 393489 TAP 2015 07 22 09 11 00 1309-99 G co CCGG 249.110 -999.990 ... V4 2015 09 15 13 35 00 36.7376 126.1328 21.00 16.00 5.00 393486 TAP 2015 07 22 09 11 00 519-99 G co CCGG 248.790 -999.990 ... V4 2015 09 15 13 19 00 36.7376 126.1328 21.00 16.00 5.00 393487 TAP 2015 07 26 06 20 00 5009-99 G co CCGG 81.320 -999.990 ... V4 2015 09 21 12 23 00 36.7376 126.1328 21.00 16.00 5.00 394007 TAP 2015 07 26 06 20 00 5010-99 G co CCGG 82.310 -999.990 ... V4 2015 09 21 12 39 00 36.7376 126.1328 21.00 16.00 5.00 394008 TAP 2015 07 26 06 34 00 3685-99 G co CCGG 91.770 -999.990 ... V4 2015 09 21 12 55 00 36.7376 126.1328 21.00 16.00 5.00 394003 TAP 2015 07 26 06 34 00 3686-99 G co CCGG 93.660 -999.990 ... V4 2015 09 21 13 11 00 36.7376 126.1328 21.00 16.00 5.00 394004 TAP 2015 07 31 08 41 00 101-99 G co CCGG 140.720 -999.990 ... V4 2015 09 16 12 18 00 36.7376 126.1328 21.00 16.00 5.00 393490 TAP 2015 07 31 08 41 00 970-99 G co CCGG 140.520 -999.990 ... V4 2015 09 16 12 34 00 36.7376 126.1328 21.00 16.00 5.00 393491 TAP 2015 07 31 08 55 00 3734-99 G co CCGG 151.680 -999.990 ... V4 2015 09 16 10 43 00 36.7376 126.1328 21.00 16.00 5.00 393492 TAP 2015 07 31 08 55 00 3995-99 G co CCGG 151.910 -999.990 ... V4 2015 09 16 10 59 00 36.7376 126.1328 21.00 16.00 5.00 393493 TAP 2015 08 06 06 42 00 1208-99 G co CCGG 105.960 -999.990 ... V4 2015 09 23 11 10 00 36.7376 126.1328 21.00 16.00 5.00 394297 TAP 2015 08 06 06 42 00 1659-99 G co CCGG 105.360 -999.990 ... V4 2015 09 23 11 26 00 36.7376 126.1328 21.00 16.00 5.00 394298 TAP 2015 08 06 06 55 00 5126-99 G co CCGG 108.630 -999.990 ... V4 2015 09 23 10 54 00 36.7376 126.1328 21.00 16.00 5.00 394300 TAP 2015 08 06 06 55 00 654-99 G co CCGG 109.000 -999.990 ... V4 2015 09 23 10 38 00 36.7376 126.1328 21.00 16.00 5.00 394299 TAP 2015 08 15 06 56 00 1462-99 G co CCGG 1308.700 -999.990 +.C V4 2015 09 21 13 58 00 36.7376 126.1328 21.00 16.00 5.00 394005 TAP 2015 08 15 06 56 00 3765-99 G co CCGG 977.980 -999.990 N.C V4 2015 09 21 14 14 00 36.7376 126.1328 21.00 16.00 5.00 394006 TAP 2015 08 15 07 10 00 2625-99 G co CCGG 565.790 -999.990 .XC V4 2015 09 21 13 26 00 36.7376 126.1328 21.00 16.00 5.00 394001 TAP 2015 08 15 07 10 00 4673-99 G co CCGG 563.000 -999.990 .XC V4 2015 09 21 13 42 00 36.7376 126.1328 21.00 16.00 5.00 394002 TAP 2015 08 19 06 31 00 2931-99 G co CCGG 249.250 -999.990 ... V4 2015 10 26 12 26 00 36.7376 126.1328 21.00 16.00 5.00 396244 TAP 2015 08 19 06 31 00 2932-99 G co CCGG 248.000 -999.990 ... V4 2015 10 26 12 42 00 36.7376 126.1328 21.00 16.00 5.00 396245 TAP 2015 08 19 06 47 00 4574-99 G co CCGG 263.250 -999.990 ... V4 2015 10 23 10 11 00 36.7376 126.1328 21.00 16.00 5.00 396312 TAP 2015 08 24 05 31 00 2427-99 G co CCGG 223.000 -999.990 ... V4 2015 09 28 15 56 00 36.7376 126.1328 21.00 16.00 5.00 394243 TAP 2015 08 24 05 31 00 2428-99 G co CCGG 224.200 -999.990 ... V4 2015 09 28 16 12 00 36.7376 126.1328 21.00 16.00 5.00 394244 TAP 2015 08 24 05 45 00 3388-99 G co CCGG 223.660 -999.990 ... V4 2015 09 28 16 28 00 36.7376 126.1328 21.00 16.00 5.00 394241 TAP 2015 08 24 05 45 00 4970-99 G co CCGG 225.860 -999.990 ... V4 2015 09 28 16 43 00 36.7376 126.1328 21.00 16.00 5.00 394242 TAP 2015 08 26 07 45 00 2970-99 G co CCGG 110.350 -999.990 ... V4 2015 09 28 12 14 00 36.7376 126.1328 21.00 16.00 5.00 394237 TAP 2015 08 26 07 45 00 4718-99 G co CCGG 109.430 -999.990 ... V4 2015 09 28 12 30 00 36.7376 126.1328 21.00 16.00 5.00 394238 TAP 2015 08 26 07 58 00 2927-99 G co CCGG 112.560 -999.990 ... V4 2015 09 28 11 43 00 36.7376 126.1328 21.00 16.00 5.00 394239 TAP 2015 08 26 07 58 00 3038-99 G co CCGG 110.940 -999.990 ... V4 2015 09 28 11 58 00 36.7376 126.1328 21.00 16.00 5.00 394240 TAP 2015 09 01 05 06 00 3024-99 G co CCGG 220.580 -999.990 ... V4 2015 11 09 13 43 00 36.7376 126.1328 21.00 16.00 5.00 397226 TAP 2015 09 01 05 06 00 3558-99 G co CCGG 223.890 -999.990 ... V4 2015 11 09 13 58 00 36.7376 126.1328 21.00 16.00 5.00 397227 TAP 2015 09 01 05 20 00 2461-99 G co CCGG 222.300 -999.990 ... V4 2015 11 09 13 27 00 36.7376 126.1328 21.00 16.00 5.00 397223 TAP 2015 09 01 05 20 00 994-99 G co CCGG 226.270 -999.990 ... V4 2015 11 09 13 11 00 36.7376 126.1328 21.00 16.00 5.00 397222 TAP 2015 09 06 06 09 00 1365-99 G co CCGG 368.530 -999.990 .X. V4 2015 11 10 15 02 00 36.7376 126.1328 21.00 16.00 5.00 397220 TAP 2015 09 06 06 09 00 3687-99 G co CCGG 364.850 -999.990 .X. V4 2015 11 10 15 18 00 36.7376 126.1328 21.00 16.00 5.00 397221 TAP 2015 09 06 06 24 00 3514-99 G co CCGG 294.610 -999.990 ... V4 2015 11 10 14 30 00 36.7376 126.1328 21.00 16.00 5.00 397216 TAP 2015 09 06 06 24 00 4784-99 G co CCGG 294.330 -999.990 ... V4 2015 11 10 14 46 00 36.7376 126.1328 21.00 16.00 5.00 397217 TAP 2015 09 09 07 52 00 5229-99 G co CCGG 148.080 -999.990 ... V4 2015 11 12 10 13 00 36.7376 126.1328 21.00 16.00 5.00 397200 TAP 2015 09 09 07 52 00 5230-99 G co CCGG 148.850 -999.990 ... V4 2015 11 12 10 29 00 36.7376 126.1328 21.00 16.00 5.00 397201 TAP 2015 09 09 08 07 00 2905-99 G co CCGG 149.320 -999.990 ... V4 2015 11 10 16 37 00 36.7376 126.1328 21.00 16.00 5.00 397204 TAP 2015 09 09 08 07 00 2906-99 G co CCGG 149.130 -999.990 ... V4 2015 11 10 16 53 00 36.7376 126.1328 21.00 16.00 5.00 397205 TAP 2015 09 14 05 44 00 1272-99 G co CCGG 206.640 -999.990 ... V4 2015 11 10 15 34 00 36.7376 126.1328 21.00 16.00 5.00 397202 TAP 2015 09 14 05 44 00 5093-99 G co CCGG 206.200 -999.990 ... V4 2015 11 10 15 50 00 36.7376 126.1328 21.00 16.00 5.00 397203 TAP 2015 09 14 05 59 00 4602-99 G co CCGG 213.580 -999.990 ... V4 2015 11 10 16 06 00 36.7376 126.1328 21.00 16.00 5.00 397198 TAP 2015 09 14 05 59 00 5152-99 G co CCGG 212.150 -999.990 ... V4 2015 11 10 16 22 00 36.7376 126.1328 21.00 16.00 5.00 397199 TAP 2015 09 25 05 08 00 1592-99 G co CCGG 229.090 -999.990 ... V4 2015 11 09 14 30 00 36.7376 126.1328 21.00 16.00 5.00 397228 TAP 2015 09 25 05 08 00 2660-99 G co CCGG 227.290 -999.990 ... V4 2015 11 09 14 46 00 36.7376 126.1328 21.00 16.00 5.00 397229 TAP 2015 09 25 05 24 00 1578-99 G co CCGG 224.850 -999.990 ... V4 2015 11 09 15 18 00 36.7376 126.1328 21.00 16.00 5.00 397224 TAP 2015 09 25 05 24 00 801-99 G co CCGG 223.800 -999.990 ... V4 2015 11 09 15 02 00 36.7376 126.1328 21.00 16.00 5.00 397225 TAP 2015 10 02 06 07 00 1045-99 G co CCGG 230.750 -999.990 N.. V4 2015 11 10 13 25 00 36.7376 126.1328 21.00 16.00 5.00 397218 TAP 2015 10 02 06 07 00 1046-99 G co CCGG 226.490 -999.990 N.. V4 2015 11 10 13 41 00 36.7376 126.1328 21.00 16.00 5.00 397219 TAP 2015 10 02 06 21 00 4385-99 G co CCGG 188.100 -999.990 ... V4 2015 11 10 13 59 00 36.7376 126.1328 21.00 16.00 5.00 397214 TAP 2015 10 02 06 21 00 4386-99 G co CCGG 187.070 -999.990 ... V4 2015 11 10 14 15 00 36.7376 126.1328 21.00 16.00 5.00 397215 TAP 2015 10 09 05 10 00 3359-99 G co CCGG 168.480 -999.990 ... V4 2015 11 13 12 40 00 36.7376 126.1328 21.00 16.00 5.00 397606 TAP 2015 10 09 05 10 00 4766-99 G co CCGG 168.460 -999.990 ... V4 2015 11 13 12 55 00 36.7376 126.1328 21.00 16.00 5.00 397607 TAP 2015 10 09 05 24 00 4491-99 G co CCGG 168.950 -999.990 ... V4 2015 11 13 12 24 00 36.7376 126.1328 21.00 16.00 5.00 397603 TAP 2015 10 09 05 24 00 645-99 G co CCGG 170.070 -999.990 ... V4 2015 11 13 12 08 00 36.7376 126.1328 21.00 16.00 5.00 397602 TAP 2015 10 14 04 40 00 311-99 G co CCGG 445.890 -999.990 .X. V4 2015 11 13 11 36 00 36.7376 126.1328 21.00 16.00 5.00 397600 TAP 2015 10 14 04 40 00 313-99 G co CCGG 446.830 -999.990 .X. V4 2015 11 13 11 52 00 36.7376 126.1328 21.00 16.00 5.00 397601 TAP 2015 10 14 04 53 00 1779-99 G co CCGG 443.120 -999.990 .X. V4 2015 11 13 11 05 00 36.7376 126.1328 21.00 16.00 5.00 397604 TAP 2015 10 14 04 53 00 4761-99 G co CCGG 441.510 -999.990 .X. V4 2015 11 13 11 20 00 36.7376 126.1328 21.00 16.00 5.00 397605 TAP 2015 10 25 04 45 00 1748-99 G co CCGG 283.790 -999.990 ... V4 2015 12 21 15 29 00 36.7376 126.1328 21.00 16.00 5.00 398986 TAP 2015 10 25 04 45 00 412-99 G co CCGG 284.020 -999.990 ... V4 2015 12 21 15 13 00 36.7376 126.1328 21.00 16.00 5.00 398985 TAP 2015 10 25 05 00 00 1995-99 G co CCGG 291.170 -999.990 ... V4 2015 12 21 15 45 00 36.7376 126.1328 21.00 16.00 5.00 398983 TAP 2015 10 25 05 00 00 4213-99 G co CCGG 291.700 -999.990 ... V4 2015 12 21 16 01 00 36.7376 126.1328 21.00 16.00 5.00 398984 TAP 2015 11 12 06 23 00 27-99 G co CCGG 261.210 -999.990 ... V4 2015 12 29 09 04 00 36.7376 126.1328 21.00 16.00 5.00 398993 TAP 2015 11 12 06 23 00 28-99 G co CCGG 263.340 -999.990 ... V4 2015 12 29 09 20 00 36.7376 126.1328 21.00 16.00 5.00 398994 TAP 2015 11 12 06 37 00 3069-99 G co CCGG 262.320 -999.990 ... V4 2015 12 29 08 32 00 36.7376 126.1328 21.00 16.00 5.00 398991 TAP 2015 11 12 06 37 00 3070-99 G co CCGG 263.330 -999.990 ... V4 2015 12 29 08 48 00 36.7376 126.1328 21.00 16.00 5.00 398992 TAP 2015 11 17 07 30 00 1013-99 G co CCGG 325.780 -999.990 ... V4 2015 12 28 10 38 00 36.7376 126.1328 21.00 16.00 5.00 398990 TAP 2015 11 17 07 30 00 171-99 G co CCGG 324.600 -999.990 ... V4 2015 12 28 10 22 00 36.7376 126.1328 21.00 16.00 5.00 398989 TAP 2015 11 17 07 45 00 1794-99 G co CCGG 337.450 -999.990 N.. V4 2015 12 28 09 51 00 36.7376 126.1328 21.00 16.00 5.00 398987 TAP 2015 11 17 07 45 00 5345-99 G co CCGG 333.190 -999.990 N.. V4 2015 12 28 10 06 00 36.7376 126.1328 21.00 16.00 5.00 398988 TAP 2015 11 23 06 20 00 3117-99 G co CCGG 309.730 -999.990 N.. V4 2016 01 07 15 42 00 36.7376 126.1328 21.00 16.00 5.00 399818 TAP 2015 11 23 06 20 00 5310-99 G co CCGG 304.120 -999.990 N.. V4 2016 01 07 15 58 00 36.7376 126.1328 21.00 16.00 5.00 399819 TAP 2015 11 23 06 34 00 1008-99 G co CCGG 290.150 -999.990 ... V4 2016 01 07 16 14 00 36.7376 126.1328 21.00 16.00 5.00 399820 TAP 2015 11 23 06 34 00 3970-99 G co CCGG 290.120 -999.990 ... V4 2016 01 07 16 30 00 36.7376 126.1328 21.00 16.00 5.00 399821 TAP 2015 11 27 03 16 00 1452-99 G co CCGG 169.540 -999.990 ... V4 2016 01 07 15 10 00 36.7376 126.1328 21.00 16.00 5.00 399816 TAP 2015 11 27 03 16 00 2312-99 G co CCGG 169.560 -999.990 ... V4 2016 01 07 15 26 00 36.7376 126.1328 21.00 16.00 5.00 399817 TAP 2015 11 27 03 33 00 1479-99 G co CCGG 168.120 -999.990 ... V4 2016 01 07 14 39 00 36.7376 126.1328 21.00 16.00 5.00 399814 TAP 2015 11 27 03 33 00 5353-99 G co CCGG 167.200 -999.990 ... V4 2016 01 07 14 55 00 36.7376 126.1328 21.00 16.00 5.00 399815 TAP 2015 12 06 03 57 00 1138-99 G co CCGG 195.310 -999.990 ... V4 2016 01 20 14 19 00 36.7376 126.1328 21.00 16.00 5.00 400492 TAP 2015 12 06 03 57 00 3447-99 G co CCGG 195.080 -999.990 ... V4 2016 01 20 14 34 00 36.7376 126.1328 21.00 16.00 5.00 400493 TAP 2015 12 06 04 12 00 2921-99 G co CCGG 197.050 -999.990 ... V4 2016 01 20 14 03 00 36.7376 126.1328 21.00 16.00 5.00 400491 TAP 2015 12 06 04 12 00 501-99 G co CCGG 196.800 -999.990 ... V4 2016 01 20 13 47 00 36.7376 126.1328 21.00 16.00 5.00 400490 TAP 2015 12 12 04 21 00 1214-99 G co CCGG 281.640 -999.990 ... V4 2016 01 20 13 13 00 36.7376 126.1328 21.00 16.00 5.00 400495 TAP 2015 12 12 04 21 00 3652-99 G co CCGG 279.770 -999.990 ... V4 2016 01 20 13 29 00 36.7376 126.1328 21.00 16.00 5.00 400494 TAP 2015 12 12 04 35 00 1285-99 G co CCGG 280.010 -999.990 ... V4 2016 01 20 11 38 00 36.7376 126.1328 21.00 16.00 5.00 400496 TAP 2015 12 12 04 35 00 3835-99 G co CCGG 278.400 -999.990 ... V4 2016 01 20 11 54 00 36.7376 126.1328 21.00 16.00 5.00 400497 TAP 2015 12 17 03 21 00 2020-99 G co CCGG 166.240 -999.990 ... V4 2016 02 02 13 49 00 36.7376 126.1328 21.00 16.00 5.00 401201 TAP 2015 12 17 03 21 00 2101-99 G co CCGG 165.940 -999.990 ... V4 2016 02 02 14 05 00 36.7376 126.1328 21.00 16.00 5.00 401202 TAP 2015 12 17 03 35 00 3491-99 G co CCGG 168.010 -999.990 ... V4 2016 02 02 13 18 00 36.7376 126.1328 21.00 16.00 5.00 401205 TAP 2015 12 17 03 35 00 4609-99 G co CCGG 169.210 -999.990 ... V4 2016 02 02 13 33 00 36.7376 126.1328 21.00 16.00 5.00 401206 TAP 2015 12 28 05 34 00 112-99 G co CCGG 256.510 -999.990 ... V4 2016 02 10 15 43 00 36.7376 126.1328 21.00 16.00 5.00 401666 TAP 2015 12 28 05 34 00 4058-99 G co CCGG 255.610 -999.990 ... V4 2016 02 10 15 59 00 36.7376 126.1328 21.00 16.00 5.00 401667 TAP 2015 12 28 05 49 00 1414-99 G co CCGG 274.020 -999.990 ... V4 2016 02 10 15 11 00 36.7376 126.1328 21.00 16.00 5.00 401664 TAP 2015 12 28 05 49 00 1923-99 G co CCGG 275.390 -999.990 ... V4 2016 02 10 15 27 00 36.7376 126.1328 21.00 16.00 5.00 401665 TAP 2016 01 05 04 10 00 1866-99 G co CCGG 212.540 -999.990 ... V4 2016 02 02 14 52 00 36.7376 126.1328 21.00 16.00 5.00 401208 TAP 2016 01 05 04 10 00 3168-99 G co CCGG 213.340 -999.990 ... V4 2016 02 02 15 08 00 36.7376 126.1328 21.00 16.00 5.00 401207 TAP 2016 01 05 05 06 00 1880-99 G co CCGG 219.050 -999.990 ... V4 2016 02 02 14 37 00 36.7376 126.1328 21.00 16.00 5.00 401204 TAP 2016 01 05 05 06 00 817-99 G co CCGG 219.170 -999.990 ... V4 2016 02 02 14 21 00 36.7376 126.1328 21.00 16.00 5.00 401203 TAP 2016 01 10 06 25 00 3184-99 G co CCGG 292.520 -999.990 ... V4 2016 02 23 13 28 00 36.7376 126.1328 21.00 16.00 5.00 402642 TAP 2016 01 10 06 25 00 3782-99 G co CCGG 296.370 -999.990 ... V4 2016 02 23 13 44 00 36.7376 126.1328 21.00 16.00 5.00 402643 TAP 2016 01 10 06 34 00 5265-99 G co CCGG 292.730 -999.990 ... V4 2016 02 23 14 00 00 36.7376 126.1328 21.00 16.00 5.00 402644 TAP 2016 01 10 06 34 00 5365-99 G co CCGG 296.200 -999.990 ... V4 2016 02 23 14 16 00 36.7376 126.1328 21.00 16.00 5.00 402645 TAP 2016 01 22 01 34 00 3379-99 G co CCGG 174.220 -999.990 ... V4 2016 04 06 10 43 00 36.7376 126.1328 21.00 16.00 5.00 404519 TAP 2016 01 22 01 34 00 3380-99 G co CCGG 174.150 -999.990 ... V4 2016 04 06 10 59 00 36.7376 126.1328 21.00 16.00 5.00 404520 TAP 2016 01 22 01 50 00 3293-99 G co CCGG 171.770 -999.990 ... V4 2016 04 06 11 46 00 36.7376 126.1328 21.00 16.00 5.00 404515 TAP 2016 01 22 01 50 00 3294-99 G co CCGG 172.990 -999.990 ... V4 2016 04 06 12 02 00 36.7376 126.1328 21.00 16.00 5.00 404516 TAP 2016 01 27 06 05 00 1660-99 G co CCGG 331.550 -999.990 ... V4 2016 02 25 16 58 00 36.7376 126.1328 21.00 16.00 5.00 402624 TAP 2016 01 27 06 05 00 4952-99 G co CCGG 334.240 -999.990 ... V4 2016 02 25 17 14 00 36.7376 126.1328 21.00 16.00 5.00 402625 TAP 2016 01 27 06 19 00 4057-99 G co CCGG 326.030 -999.990 ... V4 2016 02 25 17 30 00 36.7376 126.1328 21.00 16.00 5.00 402623 TAP 2016 01 27 06 19 00 4314-99 G co CCGG 325.620 -999.990 ... V4 2016 02 25 17 46 00 36.7376 126.1328 21.00 16.00 5.00 402622 TAP 2016 02 01 03 20 00 2260-99 G co CCGG 241.390 -999.990 ... V4 2016 03 17 12 33 00 36.7376 126.1328 21.00 16.00 5.00 403617 TAP 2016 02 01 03 20 00 4569-99 G co CCGG 245.070 -999.990 ... V4 2016 03 17 12 49 00 36.7376 126.1328 21.00 16.00 5.00 403618 TAP 2016 02 01 03 35 00 4765-99 G co CCGG 230.540 -999.990 ... V4 2016 03 17 13 05 00 36.7376 126.1328 21.00 16.00 5.00 403615 TAP 2016 02 01 03 35 00 5145-99 G co CCGG 231.600 -999.990 ... V4 2016 03 17 13 21 00 36.7376 126.1328 21.00 16.00 5.00 403616 TAP 2016 02 05 03 40 00 1738-99 G co CCGG 246.710 -999.990 ... V4 2016 03 17 14 40 00 36.7376 126.1328 21.00 16.00 5.00 403655 TAP 2016 02 05 03 40 00 2096-99 G co CCGG 246.920 -999.990 ... V4 2016 03 17 14 56 00 36.7376 126.1328 21.00 16.00 5.00 403656 TAP 2016 02 05 03 55 00 3980-99 G co CCGG 248.420 -999.990 ... V4 2016 03 17 15 27 00 36.7376 126.1328 21.00 16.00 5.00 403657 TAP 2016 02 05 03 55 00 782-99 G co CCGG 248.390 -999.990 ... V4 2016 03 17 15 11 00 36.7376 126.1328 21.00 16.00 5.00 403658 TAP 2016 02 10 07 47 00 1386-99 G co CCGG 242.310 -999.990 ... V4 2016 03 16 15 25 00 36.7376 126.1328 21.00 16.00 5.00 403607 TAP 2016 02 10 07 47 00 584-99 G co CCGG 240.090 -999.990 ... V4 2016 03 16 15 09 00 36.7376 126.1328 21.00 16.00 5.00 403608 TAP 2016 02 10 07 59 00 1026-99 G co CCGG 258.560 -999.990 ... V4 2016 03 16 14 37 00 36.7376 126.1328 21.00 16.00 5.00 403609 TAP 2016 02 10 07 59 00 2136-99 G co CCGG 254.790 -999.990 ... V4 2016 03 16 14 53 00 36.7376 126.1328 21.00 16.00 5.00 403610 TAP 2016 02 15 03 10 00 3299-99 G co CCGG 186.980 -999.990 ... V4 2016 03 16 17 16 00 36.7376 126.1328 21.00 16.00 5.00 403639 TAP 2016 02 15 03 10 00 3300-99 G co CCGG 186.770 -999.990 ... V4 2016 03 16 17 31 00 36.7376 126.1328 21.00 16.00 5.00 403640 TAP 2016 02 15 03 25 00 4181-99 G co CCGG 185.110 -999.990 ... V4 2016 03 16 16 44 00 36.7376 126.1328 21.00 16.00 5.00 403641 TAP 2016 02 15 03 25 00 4182-99 G co CCGG 182.520 -999.990 ... V4 2016 03 16 17 00 00 36.7376 126.1328 21.00 16.00 5.00 403642 TAP 2016 02 21 04 02 00 3054-99 G co CCGG 289.780 -999.990 ... V4 2016 04 06 13 05 00 36.7376 126.1328 21.00 16.00 5.00 404517 TAP 2016 02 21 04 02 00 5137-99 G co CCGG 292.610 -999.990 ... V4 2016 04 06 13 21 00 36.7376 126.1328 21.00 16.00 5.00 404518 TAP 2016 02 21 04 16 00 3217-99 G co CCGG 291.760 -999.990 ... V4 2016 04 06 12 34 00 36.7376 126.1328 21.00 16.00 5.00 404521 TAP 2016 02 21 04 16 00 3301-99 G co CCGG 289.540 -999.990 ... V4 2016 04 06 12 50 00 36.7376 126.1328 21.00 16.00 5.00 404522 TAP 2016 03 02 06 10 00 1045-99 G co CCGG 194.350 -999.990 ... V4 2016 04 07 10 47 00 36.7376 126.1328 21.00 16.00 5.00 404513 TAP 2016 03 02 06 10 00 1046-99 G co CCGG 195.390 -999.990 ... V4 2016 04 07 11 03 00 36.7376 126.1328 21.00 16.00 5.00 404514 TAP 2016 03 02 06 14 00 4113-99 G co CCGG 195.970 -999.990 ... V4 2016 04 07 11 19 00 36.7376 126.1328 21.00 16.00 5.00 404511 TAP 2016 03 02 06 14 00 4114-99 G co CCGG 195.320 -999.990 ... V4 2016 04 07 11 34 00 36.7376 126.1328 21.00 16.00 5.00 404512 TAP 2016 03 17 07 00 00 1861-99 G co CCGG 333.360 -999.990 ... V4 2016 04 26 09 23 00 36.7376 126.1328 21.00 16.00 5.00 405779 TAP 2016 03 17 07 00 00 1862-99 G co CCGG 326.770 -999.990 ... V4 2016 04 26 09 38 00 36.7376 126.1328 21.00 16.00 5.00 405780 TAP 2016 03 17 07 15 00 3775-99 G co CCGG 322.470 -999.990 ... V4 2016 04 25 16 49 00 36.7376 126.1328 21.00 16.00 5.00 405781 TAP 2016 03 17 07 15 00 3776-99 G co CCGG 324.980 -999.990 ... V4 2016 04 25 17 04 00 36.7376 126.1328 21.00 16.00 5.00 405782 TAP 2016 03 24 03 45 00 2867-99 G co CCGG 299.080 -999.990 ... V4 2016 04 25 16 17 00 36.7376 126.1328 21.00 16.00 5.00 405775 TAP 2016 03 24 03 45 00 2868-99 G co CCGG 296.260 -999.990 ... V4 2016 04 25 16 33 00 36.7376 126.1328 21.00 16.00 5.00 405776 TAP 2016 03 24 03 58 00 677-99 G co CCGG 305.580 -999.990 ... V4 2016 04 25 15 45 00 36.7376 126.1328 21.00 16.00 5.00 405777 TAP 2016 03 24 03 58 00 678-99 G co CCGG 300.970 -999.990 ... V4 2016 04 25 16 01 00 36.7376 126.1328 21.00 16.00 5.00 405778 TAP 2016 03 30 07 10 00 5289-99 G co CCGG 455.680 -999.990 .X. V4 2016 05 17 16 31 00 36.7376 126.1328 21.00 16.00 5.00 406892 TAP 2016 03 30 07 10 00 5290-99 G co CCGG 454.190 -999.990 .X. V4 2016 05 17 16 47 00 36.7376 126.1328 21.00 16.00 5.00 406893 TAP 2016 03 30 07 25 00 4677-99 G co CCGG 457.590 -999.990 .X. V4 2016 05 18 12 57 00 36.7376 126.1328 21.00 16.00 5.00 406890 TAP 2016 03 30 07 25 00 4678-99 G co CCGG 457.420 -999.990 .X. V4 2016 05 18 13 13 00 36.7376 126.1328 21.00 16.00 5.00 406891 TAP 2016 04 04 07 30 00 2371-99 G co CCGG 218.340 -999.990 ... V4 2016 05 19 11 55 00 36.7376 126.1328 21.00 16.00 5.00 406962 TAP 2016 04 04 07 30 00 4830-99 G co CCGG 219.270 -999.990 ... V4 2016 05 19 12 11 00 36.7376 126.1328 21.00 16.00 5.00 406963 TAP 2016 04 04 07 45 00 3865-99 G co CCGG 216.540 -999.990 ... V4 2016 05 19 11 23 00 36.7376 126.1328 21.00 16.00 5.00 406960 TAP 2016 04 04 07 45 00 3915-99 G co CCGG 216.210 -999.990 ... V4 2016 05 19 11 39 00 36.7376 126.1328 21.00 16.00 5.00 406961 TAP 2016 04 11 05 02 00 1237-99 G co CCGG 378.310 -999.990 ... V4 2016 05 17 15 28 00 36.7376 126.1328 21.00 16.00 5.00 406888 TAP 2016 04 11 05 02 00 4028-99 G co CCGG 376.550 -999.990 ... V4 2016 05 17 15 44 00 36.7376 126.1328 21.00 16.00 5.00 406889 TAP 2016 04 11 05 17 00 1568-99 G co CCGG 364.880 -999.990 N.. V4 2016 05 17 16 15 00 36.7376 126.1328 21.00 16.00 5.00 406887 TAP 2016 04 11 05 17 00 562-99 G co CCGG 383.260 -999.990 N.. V4 2016 05 17 15 59 00 36.7376 126.1328 21.00 16.00 5.00 406886 TAP 2016 04 17 04 15 00 3892-99 G co CCGG 555.120 -999.990 .XC V4 2016 06 08 11 59 00 36.7376 126.1328 21.00 16.00 5.00 407962 TAP 2016 04 17 04 15 00 695-99 G co CCGG 553.070 -999.990 .XC V4 2016 06 08 11 44 00 36.7376 126.1328 21.00 16.00 5.00 407961 TAP 2016 04 17 04 29 00 1739-99 G co CCGG 500.070 -999.990 N.C V4 2016 06 08 12 15 00 36.7376 126.1328 21.00 16.00 5.00 407963 TAP 2016 04 17 04 29 00 4860-99 G co CCGG 495.980 -999.990 N.. V4 2016 06 08 12 31 00 36.7376 126.1328 21.00 16.00 5.00 407964 TAP 2016 04 21 04 14 00 2834-99 G co CCGG 313.910 -999.990 ... V4 2016 06 07 11 18 00 36.7376 126.1328 21.00 16.00 5.00 407947 TAP 2016 04 21 04 14 00 2892-99 G co CCGG 312.090 -999.990 ... V4 2016 06 07 11 34 00 36.7376 126.1328 21.00 16.00 5.00 407948 TAP 2016 04 21 04 28 00 1392-99 G co CCGG 314.000 -999.990 ... V4 2016 06 07 10 46 00 36.7376 126.1328 21.00 16.00 5.00 407945 TAP 2016 04 21 04 28 00 1822-99 G co CCGG 311.060 -999.990 ... V4 2016 06 07 11 02 00 36.7376 126.1328 21.00 16.00 5.00 407946 TAP 2016 04 28 06 10 00 1149-99 G co CCGG 260.680 -999.990 ... V4 2016 06 24 09 29 00 36.7376 126.1328 21.00 16.00 5.00 409184 TAP 2016 04 28 06 10 00 1150-99 G co CCGG 260.360 -999.990 ... V4 2016 06 24 09 45 00 36.7376 126.1328 21.00 16.00 5.00 409185 TAP 2016 04 28 06 25 00 4029-99 G co CCGG 272.750 -999.990 ... V4 2016 06 24 10 01 00 36.7376 126.1328 21.00 16.00 5.00 409182 TAP 2016 04 28 06 25 00 4030-99 G co CCGG 273.300 -999.990 ... V4 2016 06 24 10 17 00 36.7376 126.1328 21.00 16.00 5.00 409183 TAP 2016 05 03 06 30 00 3929-99 G co CCGG 296.130 -999.990 ... V4 2016 06 28 13 04 00 36.7376 126.1328 21.00 16.00 5.00 409070 TAP 2016 05 03 06 30 00 836-99 G co CCGG 293.320 -999.990 ... V4 2016 06 28 12 48 00 36.7376 126.1328 21.00 16.00 5.00 409071 TAP 2016 05 03 06 45 00 3297-99 G co CCGG 314.770 -999.990 ... V4 2016 06 28 13 20 00 36.7376 126.1328 21.00 16.00 5.00 409074 TAP 2016 05 03 06 45 00 3347-99 G co CCGG 314.550 -999.990 ... V4 2016 06 28 13 36 00 36.7376 126.1328 21.00 16.00 5.00 409075 TAP 2016 05 09 05 15 00 2395-99 G co CCGG 304.770 -999.990 ... V4 2016 06 27 11 15 00 36.7376 126.1328 21.00 16.00 5.00 409271 TAP 2016 05 09 05 15 00 3878-99 G co CCGG 304.080 -999.990 ... V4 2016 06 27 11 31 00 36.7376 126.1328 21.00 16.00 5.00 409270 TAP 2016 05 09 05 29 00 1575-99 G co CCGG 311.800 -999.990 ... V4 2016 06 27 10 44 00 36.7376 126.1328 21.00 16.00 5.00 409268 TAP 2016 05 09 05 29 00 4071-99 G co CCGG 311.340 -999.990 ... V4 2016 06 27 10 59 00 36.7376 126.1328 21.00 16.00 5.00 409269 TAP 2016 05 13 06 55 00 4682-99 G co CCGG 212.290 -999.990 ... V4 2016 06 28 09 38 00 36.7376 126.1328 21.00 16.00 5.00 409288 TAP 2016 05 13 06 55 00 5101-99 G co CCGG 214.490 -999.990 ... V4 2016 06 28 09 54 00 36.7376 126.1328 21.00 16.00 5.00 409289 TAP 2016 05 13 07 09 00 1582-99 G co CCGG 215.430 -999.990 ... V4 2016 06 28 10 09 00 36.7376 126.1328 21.00 16.00 5.00 409284 TAP 2016 05 13 07 09 00 3792-99 G co CCGG 217.680 -999.990 ... V4 2016 06 28 10 25 00 36.7376 126.1328 21.00 16.00 5.00 409285 TAP 2016 05 20 05 40 00 1131-99 G co CCGG 311.990 -999.990 ... V4 2016 06 28 12 32 00 36.7376 126.1328 21.00 16.00 5.00 409069 TAP 2016 05 20 05 40 00 571-99 G co CCGG 311.020 -999.990 ... V4 2016 06 28 12 17 00 36.7376 126.1328 21.00 16.00 5.00 409068 TAP 2016 05 20 05 55 00 3183-99 G co CCGG 319.210 -999.990 ... V4 2016 06 28 11 45 00 36.7376 126.1328 21.00 16.00 5.00 409072 TAP 2016 05 20 05 55 00 3727-99 G co CCGG 321.700 -999.990 ... V4 2016 06 28 12 01 00 36.7376 126.1328 21.00 16.00 5.00 409073 TAP 2016 05 24 05 51 00 1137-99 G co CCGG 226.450 -999.990 ... V4 2016 06 28 11 13 00 36.7376 126.1328 21.00 16.00 5.00 409290 TAP 2016 05 24 05 51 00 4823-99 G co CCGG 224.590 -999.990 ... V4 2016 06 28 11 29 00 36.7376 126.1328 21.00 16.00 5.00 409291 TAP 2016 05 24 06 06 00 233-99 G co CCGG 229.410 -999.990 ... V4 2016 06 28 10 42 00 36.7376 126.1328 21.00 16.00 5.00 409286 TAP 2016 05 24 06 06 00 5323-99 G co CCGG 228.330 -999.990 ... V4 2016 06 28 10 58 00 36.7376 126.1328 21.00 16.00 5.00 409287 TAP 2016 06 02 06 20 00 4920-99 G co CCGG 288.810 -999.990 ... V4 2016 07 21 14 38 00 36.7376 126.1328 21.00 16.00 5.00 410770 TAP 2016 06 02 06 20 00 977-99 G co CCGG 290.520 -999.990 ... V4 2016 07 21 14 23 00 36.7376 126.1328 21.00 16.00 5.00 410771 TAP 2016 06 02 06 34 00 153-99 G co CCGG 310.630 -999.990 ... V4 2016 07 21 13 51 00 36.7376 126.1328 21.00 16.00 5.00 410768 TAP 2016 06 02 06 34 00 1635-99 G co CCGG 310.660 -999.990 ... V4 2016 07 21 14 07 00 36.7376 126.1328 21.00 16.00 5.00 410769 TAP 2016 06 09 06 50 00 2871-99 G co CCGG 213.280 -999.990 ... V4 2016 07 22 11 24 00 36.7376 126.1328 21.00 16.00 5.00 410756 TAP 2016 06 09 06 50 00 4828-99 G co CCGG 212.750 -999.990 ... V4 2016 07 22 11 40 00 36.7376 126.1328 21.00 16.00 5.00 410757 TAP 2016 06 09 07 06 00 3641-99 G co CCGG 216.690 -999.990 ... V4 2016 07 22 11 08 00 36.7376 126.1328 21.00 16.00 5.00 410759 TAP 2016 06 09 07 06 00 905-99 G co CCGG 217.150 -999.990 ... V4 2016 07 22 10 53 00 36.7376 126.1328 21.00 16.00 5.00 410758 TAP 2016 06 19 06 10 00 1367-99 G co CCGG 312.430 -999.990 ... V4 2016 07 22 10 04 00 36.7376 126.1328 21.00 16.00 5.00 410683 TAP 2016 06 19 06 10 00 354-99 G co CCGG 314.090 -999.990 ... V4 2016 07 22 09 48 00 36.7376 126.1328 21.00 16.00 5.00 410682 TAP 2016 06 19 06 24 00 1873-99 G co CCGG 285.470 -999.990 ... V4 2016 07 22 10 21 00 36.7376 126.1328 21.00 16.00 5.00 410680 TAP 2016 06 19 06 24 00 2722-99 G co CCGG 287.670 -999.990 ... V4 2016 07 22 10 37 00 36.7376 126.1328 21.00 16.00 5.00 410681 TAP 2016 07 03 04 00 00 4514-99 G co CCGG 267.120 -999.990 N.. V4 2016 08 19 12 58 00 36.7376 126.1328 21.00 16.00 5.00 412399 TAP 2016 07 03 04 00 00 4853-99 G co CCGG 262.080 -999.990 N.. V4 2016 08 19 13 14 00 36.7376 126.1328 21.00 16.00 5.00 412400 TAP 2016 07 03 04 15 00 3256-99 G co CCGG 195.890 -999.990 ... V4 2016 08 19 12 26 00 36.7376 126.1328 21.00 16.00 5.00 412397 TAP 2016 07 03 04 15 00 4499-99 G co CCGG 195.040 -999.990 ... V4 2016 08 19 12 42 00 36.7376 126.1328 21.00 16.00 5.00 412398 TAP 2016 07 06 10 03 00 2589-99 G co CCGG 146.090 -999.990 ... V4 2016 08 18 14 40 00 36.7376 126.1328 21.00 16.00 5.00 412395 TAP 2016 07 06 10 03 00 4034-99 G co CCGG 145.320 -999.990 ... V4 2016 08 18 14 56 00 36.7376 126.1328 21.00 16.00 5.00 412396 TAP 2016 07 06 10 18 00 4547-99 G co CCGG 146.920 -999.990 ... V4 2016 08 18 14 24 00 36.7376 126.1328 21.00 16.00 5.00 412394 TAP 2016 07 06 10 18 00 945-99 G co CCGG 146.500 -999.990 ... V4 2016 08 18 14 08 00 36.7376 126.1328 21.00 16.00 5.00 412393 TAP 2016 07 11 07 40 00 2181-99 G co CCGG 136.800 -999.990 ... V4 2016 08 24 12 31 00 36.7376 126.1328 21.00 16.00 5.00 412782 TAP 2016 07 11 07 40 00 5161-99 G co CCGG 135.830 -999.990 ... V4 2016 08 24 12 46 00 36.7376 126.1328 21.00 16.00 5.00 412783 TAP 2016 07 11 08 03 00 2745-99 G co CCGG 134.240 -999.990 ... V4 2016 08 24 13 02 00 36.7376 126.1328 21.00 16.00 5.00 412778 TAP 2016 07 11 08 03 00 4908-99 G co CCGG 132.820 -999.990 ... V4 2016 08 24 13 18 00 36.7376 126.1328 21.00 16.00 5.00 412779 TAP 2016 07 17 04 10 00 256-99 G co CCGG 143.440 -999.990 ... V4 2016 08 24 14 06 00 36.7376 126.1328 21.00 16.00 5.00 412780 TAP 2016 07 17 04 10 00 391-99 G co CCGG 141.860 -999.990 ... V4 2016 08 24 14 21 00 36.7376 126.1328 21.00 16.00 5.00 412781 TAP 2016 07 17 04 25 00 1044-99 G co CCGG 147.860 -999.990 N.. V4 2016 08 24 13 34 00 36.7376 126.1328 21.00 16.00 5.00 412784 TAP 2016 07 17 04 25 00 4494-99 G co CCGG 153.020 -999.990 N.. V4 2016 08 24 13 50 00 36.7376 126.1328 21.00 16.00 5.00 412785 TAP 2016 07 22 06 00 00 5034-99 G co CCGG 182.010 -999.990 ... V4 2016 09 23 11 42 00 36.7376 126.1328 21.00 16.00 5.00 413777 TAP 2016 07 22 06 00 00 552-99 G co CCGG 184.320 -999.990 ... V4 2016 09 23 11 58 00 36.7376 126.1328 21.00 16.00 5.00 413776 TAP 2016 07 22 06 24 00 4791-99 G co CCGG 191.350 -999.990 ... V4 2016 09 23 12 14 00 36.7376 126.1328 21.00 16.00 5.00 413775 TAP 2016 07 22 06 24 00 4948-99 G co CCGG 192.080 -999.990 ... V4 2016 09 23 12 30 00 36.7376 126.1328 21.00 16.00 5.00 413774 TAP 2016 08 01 04 33 00 2941-99 G co CCGG 93.880 -999.990 ... V4 2016 09 26 11 38 00 36.7376 126.1328 21.00 16.00 5.00 413779 TAP 2016 08 01 04 33 00 5336-99 G co CCGG 92.490 -999.990 ... V4 2016 09 26 11 54 00 36.7376 126.1328 21.00 16.00 5.00 413778 TAP 2016 08 01 04 45 00 3172-99 G co CCGG 95.720 -999.990 ... V4 2016 09 26 11 06 00 36.7376 126.1328 21.00 16.00 5.00 413780 TAP 2016 08 01 04 45 00 4261-99 G co CCGG 95.350 -999.990 ... V4 2016 09 26 11 22 00 36.7376 126.1328 21.00 16.00 5.00 413781 TAP 2016 08 07 05 05 00 3960-99 G co CCGG 171.780 -999.990 ... V4 2016 10 04 10 20 00 36.7376 126.1328 21.00 16.00 5.00 414341 TAP 2016 08 07 05 05 00 4674-99 G co CCGG 173.650 -999.990 ... V4 2016 10 04 10 35 00 36.7376 126.1328 21.00 16.00 5.00 414342 TAP 2016 08 07 05 14 00 3045-99 G co CCGG 163.430 -999.990 ... V4 2016 10 04 09 00 00 36.7376 126.1328 21.00 16.00 5.00 414343 TAP 2016 08 07 05 14 00 477-99 G co CCGG 162.360 -999.990 ... V4 2016 10 04 08 44 00 36.7376 126.1328 21.00 16.00 5.00 414344 TAP 2016 08 11 05 12 00 5545-99 G co CCGG 122.400 -999.990 ... V4 2016 10 03 16 59 00 36.7376 126.1328 21.00 16.00 5.00 414337 TAP 2016 08 11 05 12 00 5546-99 G co CCGG 121.960 -999.990 ... V4 2016 10 03 17 15 00 36.7376 126.1328 21.00 16.00 5.00 414338 TAP 2016 08 12 01 00 00 5551-99 G co CCGG 128.530 -999.990 ... V4 2016 10 03 16 27 00 36.7376 126.1328 21.00 16.00 5.00 414335 TAP 2016 08 12 01 00 00 5552-99 G co CCGG 126.940 -999.990 ... V4 2016 10 03 16 43 00 36.7376 126.1328 21.00 16.00 5.00 414336 TAP 2016 08 14 04 10 00 3349-99 G co CCGG 174.650 -999.990 ... V4 2016 11 08 15 01 00 36.7376 126.1328 21.00 16.00 5.00 416292 TAP 2016 08 14 04 10 00 5077-99 G co CCGG 171.430 -999.990 ... V4 2016 11 08 15 17 00 36.7376 126.1328 21.00 16.00 5.00 416293 TAP 2016 08 14 04 15 00 405-99 G co CCGG 219.240 -999.990 N.. V4 2016 11 10 10 22 00 36.7376 126.1328 21.00 16.00 5.00 416278 TAP 2016 08 14 04 15 00 4936-99 G co CCGG 207.670 -999.990 N.. V4 2016 11 10 10 37 00 36.7376 126.1328 21.00 16.00 5.00 416279 TAP 2016 08 21 04 07 00 5521-99 G co CCGG 355.750 -999.990 .X. V4 2016 10 04 09 32 00 36.7376 126.1328 21.00 16.00 5.00 414333 TAP 2016 08 21 04 07 00 5522-99 G co CCGG 355.120 -999.990 .X. V4 2016 10 04 09 16 00 36.7376 126.1328 21.00 16.00 5.00 414334 TAP 2016 08 21 04 13 00 5687-99 G co CCGG 350.770 -999.990 .X. V4 2016 10 04 09 48 00 36.7376 126.1328 21.00 16.00 5.00 414339 TAP 2016 08 21 04 13 00 5688-99 G co CCGG 349.310 -999.990 .X. V4 2016 10 04 10 04 00 36.7376 126.1328 21.00 16.00 5.00 414340 TAP 2016 08 29 02 43 00 2271-99 G co CCGG 129.450 -999.990 ... V4 2016 11 09 16 53 00 36.7376 126.1328 21.00 16.00 5.00 416284 TAP 2016 08 29 02 43 00 4147-99 G co CCGG 128.880 -999.990 ... V4 2016 11 09 17 09 00 36.7376 126.1328 21.00 16.00 5.00 416285 TAP 2016 08 29 02 57 00 3690-99 G co CCGG 128.050 -999.990 ... V4 2016 11 08 13 42 00 36.7376 126.1328 21.00 16.00 5.00 416331 TAP 2016 08 29 02 57 00 630-99 G co CCGG 130.840 -999.990 ... V4 2016 11 08 13 26 00 36.7376 126.1328 21.00 16.00 5.00 416330 TAP 2016 09 03 04 51 00 3624-99 G co CCGG 249.880 -999.990 ... V4 2016 11 09 10 48 00 36.7376 126.1328 21.00 16.00 5.00 416347 TAP 2016 09 03 04 51 00 692-99 G co CCGG 249.150 -999.990 ... V4 2016 11 09 10 32 00 36.7376 126.1328 21.00 16.00 5.00 416346 TAP 2016 09 03 05 04 00 4164-99 G co CCGG 252.640 -999.990 ... V4 2016 11 09 14 14 00 36.7376 126.1328 21.00 16.00 5.00 416344 TAP 2016 09 03 05 04 00 4353-99 G co CCGG 253.280 -999.990 ... V4 2016 11 09 14 30 00 36.7376 126.1328 21.00 16.00 5.00 416345 TAP 2016 09 11 07 40 00 2604-99 G co CCGG 310.150 -999.990 ... V4 2016 11 08 16 05 00 36.7376 126.1328 21.00 16.00 5.00 416336 TAP 2016 09 11 07 40 00 3895-99 G co CCGG 308.080 -999.990 ... V4 2016 11 08 16 21 00 36.7376 126.1328 21.00 16.00 5.00 416337 TAP 2016 09 11 08 00 00 2988-99 G co CCGG 312.360 -999.990 ... V4 2016 11 08 15 33 00 36.7376 126.1328 21.00 16.00 5.00 416334 TAP 2016 09 11 08 00 00 590-99 G co CCGG 314.920 -999.990 ... V4 2016 11 08 15 49 00 36.7376 126.1328 21.00 16.00 5.00 416335 TAP 2016 09 20 07 32 00 3023-99 G co CCGG 170.960 -999.990 ... V4 2016 11 08 16 52 00 36.7376 126.1328 21.00 16.00 5.00 416333 TAP 2016 09 20 07 32 00 783-99 G co CCGG 167.960 -999.990 ... V4 2016 11 08 16 36 00 36.7376 126.1328 21.00 16.00 5.00 416332 TAP 2016 09 20 07 46 00 2323-99 G co CCGG 160.200 -999.990 ... V4 2016 11 09 12 39 00 36.7376 126.1328 21.00 16.00 5.00 416339 TAP 2016 09 20 07 46 00 4984-99 G co CCGG 160.790 -999.990 ... V4 2016 11 09 12 55 00 36.7376 126.1328 21.00 16.00 5.00 416338 TAP 2016 09 29 07 02 00 3659-99 G co CCGG 321.070 -999.990 ... V4 2016 11 09 13 58 00 36.7376 126.1328 21.00 16.00 5.00 416343 TAP 2016 09 29 07 02 00 8-99 G co CCGG 318.080 -999.990 ... V4 2016 11 09 13 43 00 36.7376 126.1328 21.00 16.00 5.00 416342 TAP 2016 09 29 07 17 00 1330-99 G co CCGG 319.850 -999.990 ... V4 2016 11 09 13 11 00 36.7376 126.1328 21.00 16.00 5.00 416340 TAP 2016 09 29 07 17 00 1892-99 G co CCGG 318.400 -999.990 ... V4 2016 11 09 13 27 00 36.7376 126.1328 21.00 16.00 5.00 416341 TAP 2016 10 04 07 31 00 4240-99 G co CCGG 248.840 -999.990 ... V4 2016 11 10 10 53 00 36.7376 126.1328 21.00 16.00 5.00 416282 TAP 2016 10 04 07 31 00 4580-99 G co CCGG 249.700 -999.990 ... V4 2016 11 10 11 09 00 36.7376 126.1328 21.00 16.00 5.00 416283 TAP 2016 10 04 07 46 00 35-99 G co CCGG 256.090 -999.990 ... V4 2016 11 09 17 40 00 36.7376 126.1328 21.00 16.00 5.00 416280 TAP 2016 10 04 07 46 00 4375-99 G co CCGG 260.010 -999.990 ... V4 2016 11 09 17 25 00 36.7376 126.1328 21.00 16.00 5.00 416281 TAP 2016 10 09 04 00 00 4770-99 G co CCGG 153.860 -999.990 ... V4 2016 11 29 16 05 00 36.7376 126.1328 21.00 16.00 5.00 417296 TAP 2016 10 09 04 00 00 74-99 G co CCGG 152.950 -999.990 ... V4 2016 11 29 15 49 00 36.7376 126.1328 21.00 16.00 5.00 417295 TAP 2016 10 09 04 15 00 1690-99 G co CCGG 152.600 -999.990 ... V4 2016 11 29 15 17 00 36.7376 126.1328 21.00 16.00 5.00 417291 TAP 2016 10 09 04 15 00 2256-99 G co CCGG 152.500 -999.990 ... V4 2016 11 29 15 33 00 36.7376 126.1328 21.00 16.00 5.00 417292 TAP 2016 10 17 05 15 00 3145-99 G co CCGG 270.230 -999.990 ... V4 2016 11 29 14 46 00 36.7376 126.1328 21.00 16.00 5.00 417293 TAP 2016 10 17 05 15 00 3549-99 G co CCGG 269.260 -999.990 ... V4 2016 11 29 15 01 00 36.7376 126.1328 21.00 16.00 5.00 417294 TAP 2016 10 17 05 30 00 1049-99 G co CCGG 270.470 -999.990 ... V4 2016 11 29 13 42 00 36.7376 126.1328 21.00 16.00 5.00 417297 TAP 2016 10 17 05 30 00 3290-99 G co CCGG 268.730 -999.990 ... V4 2016 11 29 13 58 00 36.7376 126.1328 21.00 16.00 5.00 417298 TAP 2016 10 24 02 54 00 2003-99 G co CCGG 166.650 -999.990 ... V4 2017 01 25 14 41 00 36.7376 126.1328 21.00 16.00 5.00 419589 TAP 2016 10 24 02 54 00 3060-99 G co CCGG 168.330 -999.990 ... V4 2017 01 25 14 56 00 36.7376 126.1328 21.00 16.00 5.00 419590 TAP 2016 10 24 03 10 00 3803-99 G co CCGG 166.620 -999.990 ... V4 2017 01 25 15 28 00 36.7376 126.1328 21.00 16.00 5.00 419594 TAP 2016 10 24 03 10 00 553-99 G co CCGG 165.990 -999.990 ... V4 2017 01 25 15 12 00 36.7376 126.1328 21.00 16.00 5.00 419593 TAP 2016 10 30 04 52 00 1001-99 G co CCGG 186.120 -999.990 ... V4 2016 12 29 12 19 00 36.7376 126.1328 21.00 16.00 5.00 418649 TAP 2016 10 30 04 52 00 4119-99 G co CCGG 186.630 -999.990 ... V4 2016 12 29 12 35 00 36.7376 126.1328 21.00 16.00 5.00 418648 TAP 2016 10 30 05 07 00 2867-99 G co CCGG 191.410 -999.990 ... V4 2016 12 29 11 47 00 36.7376 126.1328 21.00 16.00 5.00 418652 TAP 2016 10 30 05 07 00 2868-99 G co CCGG 190.450 -999.990 ... V4 2016 12 29 12 03 00 36.7376 126.1328 21.00 16.00 5.00 418653 TAP 2016 11 03 04 24 00 1469-99 G co CCGG 292.350 -999.990 ... V4 2016 12 29 12 51 00 36.7376 126.1328 21.00 16.00 5.00 418650 TAP 2016 11 03 04 24 00 4796-99 G co CCGG 295.100 -999.990 ... V4 2016 12 29 13 06 00 36.7376 126.1328 21.00 16.00 5.00 418651 TAP 2016 11 03 04 39 00 2054-99 G co CCGG 314.650 -999.990 ... V4 2016 12 29 13 22 00 36.7376 126.1328 21.00 16.00 5.00 418654 TAP 2016 11 03 04 39 00 5219-99 G co CCGG 310.500 -999.990 N.. V4 2016 12 29 13 38 00 36.7376 126.1328 21.00 16.00 5.00 418655 TAP 2016 11 15 04 41 00 1848-99 G co CCGG 177.360 -999.990 ... V4 2017 01 31 12 17 00 36.7376 126.1328 21.00 16.00 5.00 419811 TAP 2016 11 15 04 41 00 4835-99 G co CCGG 178.040 -999.990 ... V4 2017 01 31 12 33 00 36.7376 126.1328 21.00 16.00 5.00 419812 TAP 2016 11 15 04 58 00 2044-99 G co CCGG 173.800 -999.990 ... V4 2017 01 31 17 19 00 36.7376 126.1328 21.00 16.00 5.00 419813 TAP 2016 11 27 06 00 00 3096-99 G co CCGG 501.720 -999.990 .XC V4 2017 01 25 15 44 00 36.7376 126.1328 21.00 16.00 5.00 419595 TAP 2016 11 27 06 00 00 3526-99 G co CCGG 500.320 -999.990 .XC V4 2017 01 25 16 00 00 36.7376 126.1328 21.00 16.00 5.00 419596 TAP 2016 11 27 06 15 00 2272-99 G co CCGG 420.490 -999.990 .X. V4 2017 01 25 16 16 00 36.7376 126.1328 21.00 16.00 5.00 419591 TAP 2016 11 27 06 15 00 5066-99 G co CCGG 421.500 -999.990 .X. V4 2017 01 25 16 32 00 36.7376 126.1328 21.00 16.00 5.00 419592 TAP 2016 12 01 06 00 00 2876-99 G co CCGG 165.040 -999.990 ... V4 2017 01 26 15 34 00 36.7376 126.1328 21.00 16.00 5.00 419587 TAP 2016 12 01 06 00 00 769-99 G co CCGG 165.750 -999.990 ... V4 2017 01 26 15 18 00 36.7376 126.1328 21.00 16.00 5.00 419588 TAP 2016 12 01 06 15 00 4559-99 G co CCGG 153.550 -999.990 ... V4 2017 01 26 14 46 00 36.7376 126.1328 21.00 16.00 5.00 419581 TAP 2016 12 01 06 15 00 4920-99 G co CCGG 154.180 -999.990 ... V4 2017 01 26 15 02 00 36.7376 126.1328 21.00 16.00 5.00 419582 TAP 2016 12 10 04 07 00 4053-99 G co CCGG 162.020 -999.990 ... V4 2017 01 26 13 43 00 36.7376 126.1328 21.00 16.00 5.00 419583 TAP 2016 12 10 04 07 00 4077-99 G co CCGG 163.460 -999.990 ... V4 2017 01 26 13 59 00 36.7376 126.1328 21.00 16.00 5.00 419584 TAP 2016 12 10 04 17 00 1906-99 G co CCGG 166.330 -999.990 ... V4 2017 01 26 14 14 00 36.7376 126.1328 21.00 16.00 5.00 419585 TAP 2016 12 10 04 17 00 2463-99 G co CCGG 166.690 -999.990 ... V4 2017 01 26 14 30 00 36.7376 126.1328 21.00 16.00 5.00 419586 TAP 2016 12 15 03 05 00 3020-99 G co CCGG 155.840 -999.990 ... V4 2017 03 03 09 45 00 36.7376 126.1328 21.00 16.00 5.00 421660 TAP 2016 12 15 03 05 00 4605-99 G co CCGG 154.700 -999.990 ... V4 2017 03 03 10 01 00 36.7376 126.1328 21.00 16.00 5.00 421661 TAP 2016 12 15 03 20 00 1220-99 G co CCGG 156.580 -999.990 ... V4 2017 03 03 09 13 00 36.7376 126.1328 21.00 16.00 5.00 421656 TAP 2016 12 15 03 20 00 1277-99 G co CCGG 156.550 -999.990 ... V4 2017 03 03 09 29 00 36.7376 126.1328 21.00 16.00 5.00 421657 TAP 2016 12 28 04 40 00 4839-99 G co CCGG 250.910 -999.990 ... V4 2017 03 07 13 49 00 36.7376 126.1328 21.00 16.00 5.00 422086 TAP 2016 12 28 04 40 00 5364-99 G co CCGG 251.990 -999.990 ... V4 2017 03 07 14 05 00 36.7376 126.1328 21.00 16.00 5.00 422087 TAP 2016 12 28 04 54 00 2589-99 G co CCGG 247.500 -999.990 ... V4 2017 03 07 13 18 00 36.7376 126.1328 21.00 16.00 5.00 422084 TAP 2016 12 28 04 54 00 4777-99 G co CCGG 246.970 -999.990 ... V4 2017 03 07 13 34 00 36.7376 126.1328 21.00 16.00 5.00 422085 TAP 2017 01 08 07 10 00 3858-99 G co CCGG 284.910 -999.990 ... V4 2017 03 13 11 01 00 36.7376 126.1328 21.00 16.00 5.00 422209 TAP 2017 01 08 07 10 00 4254-99 G co CCGG 281.420 -999.990 N.. V4 2017 03 13 11 17 00 36.7376 126.1328 21.00 16.00 5.00 422210 TAP 2017 01 08 07 25 00 3341-99 G co CCGG 297.260 -999.990 ... V4 2017 03 13 11 36 00 36.7376 126.1328 21.00 16.00 5.00 422207 TAP 2017 01 08 07 25 00 4393-99 G co CCGG 298.280 -999.990 ... V4 2017 03 13 11 52 00 36.7376 126.1328 21.00 16.00 5.00 422208 TAP 2017 01 10 04 30 00 2823-99 G co CCGG 238.010 -999.990 ... V4 2017 03 02 16 13 00 36.7376 126.1328 21.00 16.00 5.00 421658 TAP 2017 01 10 04 30 00 977-99 G co CCGG 234.520 -999.990 N.. V4 2017 03 02 15 57 00 36.7376 126.1328 21.00 16.00 5.00 421659 TAP 2017 01 10 04 45 00 2020-99 G co CCGG 236.870 -999.990 ... V4 2017 03 02 16 29 00 36.7376 126.1328 21.00 16.00 5.00 421654 TAP 2017 01 10 04 45 00 3147-99 G co CCGG 234.460 -999.990 ... V4 2017 03 02 16 45 00 36.7376 126.1328 21.00 16.00 5.00 421655 TAP 2017 01 15 04 10 00 1141-99 G co CCGG 195.710 -999.990 ... V4 2017 03 21 10 04 00 36.7376 126.1328 21.00 16.00 5.00 422538 TAP 2017 01 15 04 10 00 5144-99 G co CCGG 196.280 -999.990 ... V4 2017 03 21 10 20 00 36.7376 126.1328 21.00 16.00 5.00 422539 TAP 2017 01 15 04 25 00 2327-99 G co CCGG 357.720 -999.990 N.. V4 2017 03 21 10 36 00 36.7376 126.1328 21.00 16.00 5.00 422534 TAP 2017 01 15 04 25 00 4596-99 G co CCGG 200.750 -999.990 N.. V4 2017 03 21 10 52 00 36.7376 126.1328 21.00 16.00 5.00 422535 TAP 2017 01 24 06 05 00 1465-99 G co CCGG 271.430 -999.990 ... V4 2017 03 21 11 29 00 36.7376 126.1328 21.00 16.00 5.00 422540 TAP 2017 01 24 06 05 00 713-99 G co CCGG 273.340 -999.990 ... V4 2017 03 21 11 13 00 36.7376 126.1328 21.00 16.00 5.00 422541 TAP 2017 01 24 06 20 00 4364-99 G co CCGG 270.530 -999.990 ... V4 2017 03 21 12 20 00 36.7376 126.1328 21.00 16.00 5.00 422536 TAP 2017 01 24 06 20 00 4652-99 G co CCGG 269.570 -999.990 ... V4 2017 03 21 12 36 00 36.7376 126.1328 21.00 16.00 5.00 422537 TAP 2017 02 07 06 14 00 201-99 G co CCGG 213.750 -999.990 ... V4 2017 03 30 11 37 00 36.7376 126.1328 21.00 16.00 5.00 422855 TAP 2017 02 07 06 14 00 2479-99 G co CCGG 213.760 -999.990 ... V4 2017 03 30 11 53 00 36.7376 126.1328 21.00 16.00 5.00 422856 TAP 2017 02 07 17 00 00 3011-99 G co CCGG 211.490 -999.990 ... V4 2017 03 28 16 23 00 36.7376 126.1328 21.00 16.00 5.00 422873 TAP 2017 02 07 17 00 00 4688-99 G co CCGG 211.650 -999.990 ... V4 2017 03 28 16 38 00 36.7376 126.1328 21.00 16.00 5.00 422874 TAP 2017 02 12 06 10 00 2256-99 G co CCGG 246.580 -999.990 ... V4 2017 03 28 13 12 00 36.7376 126.1328 21.00 16.00 5.00 422845 TAP 2017 02 12 06 10 00 3145-99 G co CCGG 246.450 -999.990 ... V4 2017 03 28 13 28 00 36.7376 126.1328 21.00 16.00 5.00 422846 TAP 2017 02 12 06 25 00 1636-99 G co CCGG 250.620 -999.990 ... V4 2017 03 28 12 56 00 36.7376 126.1328 21.00 16.00 5.00 422844 TAP 2017 02 12 06 25 00 546-99 G co CCGG 247.890 -999.990 ... V4 2017 03 28 12 41 00 36.7376 126.1328 21.00 16.00 5.00 422843 TAP 2017 02 18 05 10 00 1042-99 G co CCGG 174.150 -999.990 N.. V4 2017 03 29 16 00 00 36.7376 126.1328 21.00 16.00 5.00 422839 TAP 2017 02 18 05 10 00 2659-99 G co CCGG 178.840 -999.990 N.. V4 2017 03 29 16 16 00 36.7376 126.1328 21.00 16.00 5.00 422840 TAP 2017 02 18 05 25 00 1533-99 G co CCGG 165.500 -999.990 ... V4 2017 03 29 16 48 00 36.7376 126.1328 21.00 16.00 5.00 422837 TAP 2017 02 18 05 25 00 350-99 G co CCGG 165.910 -999.990 ... V4 2017 03 29 16 32 00 36.7376 126.1328 21.00 16.00 5.00 422838 TAP 2017 02 25 07 40 00 3355-99 G co CCGG 247.300 -999.990 ... V4 2017 04 26 13 53 00 36.7376 126.1328 21.00 16.00 5.00 424309 TAP 2017 02 25 07 40 00 5632-99 G co CCGG 247.930 -999.990 ... V4 2017 04 26 14 09 00 36.7376 126.1328 21.00 16.00 5.00 424310 TAP 2017 02 25 07 54 00 3118-99 G co CCGG 258.500 -999.990 N.. V4 2017 04 26 14 24 00 36.7376 126.1328 21.00 16.00 5.00 424305 TAP 2017 02 25 07 54 00 4046-99 G co CCGG 263.570 -999.990 N.. V4 2017 04 26 14 40 00 36.7376 126.1328 21.00 16.00 5.00 424306 TAP 2017 03 03 06 50 00 2445-99 G co CCGG 215.060 -999.990 ... V4 2017 04 28 12 17 00 36.7376 126.1328 21.00 16.00 5.00 424318 TAP 2017 03 03 06 50 00 903-99 G co CCGG 215.320 -999.990 ... V4 2017 04 28 12 01 00 36.7376 126.1328 21.00 16.00 5.00 424317 TAP 2017 03 03 07 05 00 1475-99 G co CCGG 214.670 -999.990 ... V4 2017 04 28 12 33 00 36.7376 126.1328 21.00 16.00 5.00 424319 TAP 2017 03 03 07 05 00 5029-99 G co CCGG 215.810 -999.990 ... V4 2017 04 28 12 49 00 36.7376 126.1328 21.00 16.00 5.00 424320 TAP 2017 03 10 07 50 00 5677-99 G co CCGG 198.750 -999.990 ... V4 2017 04 26 15 28 00 36.7376 126.1328 21.00 16.00 5.00 424307 TAP 2017 03 10 07 50 00 5678-99 G co CCGG 198.760 -999.990 ... V4 2017 04 26 15 44 00 36.7376 126.1328 21.00 16.00 5.00 424308 TAP 2017 03 10 08 05 00 2683-99 G co CCGG 200.880 -999.990 ... V4 2017 04 26 14 56 00 36.7376 126.1328 21.00 16.00 5.00 424311 TAP 2017 03 10 08 05 00 2684-99 G co CCGG 198.700 -999.990 ... V4 2017 04 26 15 12 00 36.7376 126.1328 21.00 16.00 5.00 424312 TAP 2017 03 22 08 30 00 4613-99 G co CCGG 293.400 -999.990 ... V4 2017 05 04 13 40 00 36.7376 126.1328 21.00 16.00 5.00 424525 TAP 2017 03 22 08 30 00 820-99 G co CCGG 292.580 -999.990 ... V4 2017 05 04 13 24 00 36.7376 126.1328 21.00 16.00 5.00 424526 TAP 2017 03 22 08 45 00 3910-99 G co CCGG 319.970 -999.990 N.. V4 2017 05 04 14 12 00 36.7376 126.1328 21.00 16.00 5.00 424524 TAP 2017 03 22 08 45 00 436-99 G co CCGG 314.370 -999.990 N.. V4 2017 05 04 13 56 00 36.7376 126.1328 21.00 16.00 5.00 424523 TAP 2017 03 26 04 30 00 1295-99 G co CCGG 298.590 -999.990 N.. V4 2017 05 03 11 43 00 36.7376 126.1328 21.00 16.00 5.00 424529 TAP 2017 03 26 04 30 00 1913-99 G co CCGG 277.640 -999.990 N.. V4 2017 05 03 11 59 00 36.7376 126.1328 21.00 16.00 5.00 424530 TAP 2017 03 26 04 45 00 1000-99 G co CCGG 278.650 -999.990 ... V4 2017 05 03 11 12 00 36.7376 126.1328 21.00 16.00 5.00 424527 TAP 2017 03 26 04 45 00 4846-99 G co CCGG 279.460 -999.990 ... V4 2017 05 03 11 28 00 36.7376 126.1328 21.00 16.00 5.00 424528 TAP 2017 04 02 04 10 00 1441-99 G co CCGG 430.780 -999.990 .X. V4 2017 05 15 12 49 00 36.7376 126.1328 21.00 16.00 5.00 425205 TAP 2017 04 02 04 10 00 4492-99 G co CCGG 431.510 -999.990 .X. V4 2017 05 15 13 05 00 36.7376 126.1328 21.00 16.00 5.00 425206 TAP 2017 04 02 04 25 00 1981-99 G co CCGG 436.440 -999.990 .X. V4 2017 05 15 12 18 00 36.7376 126.1328 21.00 16.00 5.00 425209 TAP 2017 04 02 04 25 00 4333-99 G co CCGG 436.740 -999.990 .X. V4 2017 05 15 12 34 00 36.7376 126.1328 21.00 16.00 5.00 425210 TAP 2017 04 11 08 35 00 5326-99 G co CCGG 305.180 -999.990 N.. V4 2017 05 15 14 09 00 36.7376 126.1328 21.00 16.00 5.00 425208 TAP 2017 04 11 08 35 00 893-99 G co CCGG 312.850 -999.990 N.. V4 2017 05 15 13 53 00 36.7376 126.1328 21.00 16.00 5.00 425207 TAP 2017 04 11 08 49 00 245-99 G co CCGG 266.840 -999.990 ... V4 2017 05 15 13 21 00 36.7376 126.1328 21.00 16.00 5.00 425203 TAP 2017 04 11 08 49 00 688-99 G co CCGG 271.640 -999.990 A.. V4 2017 05 15 13 37 00 36.7376 126.1328 21.00 16.00 5.00 425204 TAP 2017 04 21 07 35 00 405-99 G co CCGG 223.660 -999.990 ... V2 2017 06 20 14 18 00 36.7376 126.1328 21.00 16.00 5.00 426922 TAP 2017 04 21 07 35 00 4365-99 G co CCGG 224.240 -999.990 ... V2 2017 06 20 14 34 00 36.7376 126.1328 21.00 16.00 5.00 426923 TAP 2017 04 21 07 50 00 3969-99 G co CCGG 228.700 -999.990 ... V2 2017 06 20 14 49 00 36.7376 126.1328 21.00 16.00 5.00 426926 TAP 2017 04 21 07 50 00 4717-99 G co CCGG 231.430 -999.990 ... V2 2017 06 20 15 05 00 36.7376 126.1328 21.00 16.00 5.00 426927 TAP 2017 04 28 04 00 00 113-99 G co CCGG 271.990 -999.990 ... V2 2017 06 21 16 13 00 36.7376 126.1328 21.00 16.00 5.00 426913 TAP 2017 04 28 04 00 00 360-99 G co CCGG 271.690 -999.990 ... V2 2017 06 21 16 29 00 36.7376 126.1328 21.00 16.00 5.00 426912 TAP 2017 04 28 04 15 00 5131-99 G co CCGG 281.860 -999.990 ... V2 2017 06 21 17 17 00 36.7376 126.1328 21.00 16.00 5.00 426910 TAP 2017 04 28 04 15 00 5513-99 G co CCGG 283.190 -999.990 ... V2 2017 06 21 17 33 00 36.7376 126.1328 21.00 16.00 5.00 426911 TAP 2017 05 05 05 14 00 2866-99 G co CCGG 211.810 -999.990 ... V2 2017 06 20 15 53 00 36.7376 126.1328 21.00 16.00 5.00 426928 TAP 2017 05 05 05 14 00 5652-99 G co CCGG 210.360 -999.990 ... V2 2017 06 20 16 09 00 36.7376 126.1328 21.00 16.00 5.00 426929 TAP 2017 05 05 05 19 00 1516-99 G co CCGG 209.870 -999.990 ... V2 2017 06 20 15 21 00 36.7376 126.1328 21.00 16.00 5.00 426924 TAP 2017 05 05 05 19 00 2430-99 G co CCGG 211.880 -999.990 ... V2 2017 06 20 15 37 00 36.7376 126.1328 21.00 16.00 5.00 426925 TAP 2017 05 10 09 05 00 1730-99 G co CCGG -999.990 -999.990 *.. V2 2017 06 21 10 09 00 36.7376 126.1328 21.00 16.00 5.00 426916 TAP 2017 05 10 09 05 00 518-99 G co CCGG -999.990 -999.990 *.. V2 2017 06 21 09 53 00 36.7376 126.1328 21.00 16.00 5.00 426917 TAP 2017 05 10 09 19 00 2472-99 G co CCGG 148.520 -999.990 ... V2 2017 06 20 16 25 00 36.7376 126.1328 21.00 16.00 5.00 426914 TAP 2017 05 10 09 19 00 3307-99 G co CCGG 148.470 -999.990 ... V2 2017 06 20 16 40 00 36.7376 126.1328 21.00 16.00 5.00 426915 TAP 2017 05 16 09 05 00 4513-99 G co CCGG 178.970 -999.990 ... V2 2017 07 24 16 41 00 36.7376 126.1328 21.00 16.00 5.00 428172 TAP 2017 05 16 09 05 00 4765-99 G co CCGG 180.250 -999.990 ... V2 2017 07 24 16 56 00 36.7376 126.1328 21.00 16.00 5.00 428173 TAP 2017 05 16 09 57 00 145-99 G co CCGG 185.040 -999.990 ... V2 2017 07 24 12 59 00 36.7376 126.1328 21.00 16.00 5.00 427993 TAP 2017 05 16 09 57 00 242-99 G co CCGG 183.920 -999.990 ... V2 2017 07 24 13 14 00 36.7376 126.1328 21.00 16.00 5.00 427994 TAP 2017 05 25 04 15 00 4766-99 G co CCGG 161.650 -999.990 ... V2 2017 07 18 14 16 00 36.7376 126.1328 21.00 16.00 5.00 427939 TAP 2017 05 25 04 15 00 5472-99 G co CCGG 163.130 -999.990 ... V2 2017 07 18 14 32 00 36.7376 126.1328 21.00 16.00 5.00 427940 TAP 2017 05 25 04 28 00 2233-99 G co CCGG 167.390 -999.990 ... V2 2017 07 18 14 48 00 36.7376 126.1328 21.00 16.00 5.00 427937 TAP 2017 05 25 04 28 00 4217-99 G co CCGG 168.040 -999.990 ... V2 2017 07 18 15 04 00 36.7376 126.1328 21.00 16.00 5.00 427938 TAP 2017 05 31 06 40 00 1912-99 G co CCGG 130.880 -999.990 ... V2 2017 07 18 15 20 00 36.7376 126.1328 21.00 16.00 5.00 427941 TAP 2017 05 31 06 40 00 4609-99 G co CCGG 129.570 -999.990 ... V2 2017 07 18 15 36 00 36.7376 126.1328 21.00 16.00 5.00 427942 TAP 2017 05 31 06 55 00 169-99 G co CCGG 132.920 -999.990 ... V2 2017 07 18 15 52 00 36.7376 126.1328 21.00 16.00 5.00 427943 TAP 2017 05 31 06 55 00 4167-99 G co CCGG 133.130 -999.990 ... V2 2017 07 18 16 07 00 36.7376 126.1328 21.00 16.00 5.00 427944 TAP 2017 06 04 04 00 00 3812-99 G co CCGG 154.190 -999.990 ... V2 2017 07 26 17 13 00 36.7376 126.1328 21.00 16.00 5.00 428363 TAP 2017 06 04 04 00 00 581-99 G co CCGG 153.960 -999.990 ... V2 2017 07 26 16 57 00 36.7376 126.1328 21.00 16.00 5.00 428364 TAP 2017 06 04 04 15 00 3297-99 G co CCGG 155.160 -999.990 ... V2 2017 07 26 16 25 00 36.7376 126.1328 21.00 16.00 5.00 428361 TAP 2017 06 04 04 15 00 5027-99 G co CCGG 155.900 -999.990 ... V2 2017 07 26 16 41 00 36.7376 126.1328 21.00 16.00 5.00 428362 TAP 2017 06 09 07 30 00 1315-99 G co CCGG 319.890 -999.990 ... V2 2017 07 26 15 05 00 36.7376 126.1328 21.00 16.00 5.00 428357 TAP 2017 06 09 07 30 00 802-99 G co CCGG 320.090 -999.990 ... V2 2017 07 26 14 50 00 36.7376 126.1328 21.00 16.00 5.00 428358 TAP 2017 06 09 07 45 00 1641-99 G co CCGG 320.170 -999.990 ... V2 2017 07 26 14 34 00 36.7376 126.1328 21.00 16.00 5.00 428360 TAP 2017 06 09 07 45 00 260-99 G co CCGG 319.980 -999.990 ... V2 2017 07 26 14 18 00 36.7376 126.1328 21.00 16.00 5.00 428359 TAP 2017 06 30 06 40 00 2883-99 G co CCGG 265.650 -999.990 ... V2 2017 08 16 16 11 00 36.7376 126.1328 21.00 16.00 5.00 429266 TAP 2017 06 30 06 40 00 3572-99 G co CCGG 266.180 -999.990 ... V2 2017 08 16 16 27 00 36.7376 126.1328 21.00 16.00 5.00 429267 TAP 2017 06 30 06 55 00 3482-99 G co CCGG 262.890 -999.990 ... V2 2017 08 16 15 39 00 36.7376 126.1328 21.00 16.00 5.00 429265 TAP 2017 06 30 06 55 00 4684-99 G co CCGG 262.580 -999.990 ... V2 2017 08 16 15 55 00 36.7376 126.1328 21.00 16.00 5.00 429264 TAP 2017 07 12 08 03 00 4790-99 G co CCGG 131.010 -999.990 ... V2 2017 08 16 10 54 00 36.7376 126.1328 21.00 16.00 5.00 429160 TAP 2017 07 12 08 03 00 4837-99 G co CCGG 131.200 -999.990 ... V2 2017 08 16 11 10 00 36.7376 126.1328 21.00 16.00 5.00 429161 TAP 2017 07 12 08 18 00 1993-99 G co CCGG 149.170 -999.990 ... V2 2017 08 16 12 29 00 36.7376 126.1328 21.00 16.00 5.00 429163 TAP 2017 07 12 08 18 00 5403-99 G co CCGG 149.160 -999.990 ... V2 2017 08 16 12 45 00 36.7376 126.1328 21.00 16.00 5.00 429162 TAP 2017 07 19 08 10 00 3997-99 G co CCGG 217.410 -999.990 ... V2 2017 09 25 14 10 00 36.7376 126.1328 21.00 16.00 5.00 431228 TAP 2017 07 19 08 10 00 4753-99 G co CCGG 216.170 -999.990 ... V2 2017 09 25 14 26 00 36.7376 126.1328 21.00 16.00 5.00 431229 TAP 2017 07 19 08 14 00 4427-99 G co CCGG 215.750 -999.990 ... V2 2017 09 25 13 55 00 36.7376 126.1328 21.00 16.00 5.00 431226 TAP 2017 07 19 08 14 00 876-99 G co CCGG 216.700 -999.990 ... V2 2017 09 25 13 39 00 36.7376 126.1328 21.00 16.00 5.00 431227 TAP 2017 08 04 04 25 00 4271-99 G co CCGG 258.510 -999.990 N.. V2 2017 09 29 11 52 00 36.7376 126.1328 21.00 16.00 5.00 431341 TAP 2017 08 04 04 25 00 65-99 G co CCGG 253.970 -999.990 N.. V2 2017 09 29 11 36 00 36.7376 126.1328 21.00 16.00 5.00 431340 TAP 2017 08 04 04 37 00 1014-99 G co CCGG 181.830 -999.990 ... V2 2017 09 29 12 08 00 36.7376 126.1328 21.00 16.00 5.00 431338 TAP 2017 08 04 04 37 00 1136-99 G co CCGG 183.830 -999.990 ... V2 2017 09 29 12 24 00 36.7376 126.1328 21.00 16.00 5.00 431339 TAP 2017 08 14 06 05 00 2514-99 G co CCGG 101.680 -999.990 ... V2 2017 09 29 12 40 00 36.7376 126.1328 21.00 16.00 5.00 431360 TAP 2017 08 14 06 05 00 3447-99 G co CCGG 102.270 -999.990 ... V2 2017 09 29 12 55 00 36.7376 126.1328 21.00 16.00 5.00 431361 TAP 2017 08 14 06 20 00 2621-99 G co CCGG 103.590 -999.990 ... V2 2017 09 29 13 11 00 36.7376 126.1328 21.00 16.00 5.00 431362 TAP 2017 08 14 06 20 00 4731-99 G co CCGG 102.730 -999.990 ... V2 2017 09 29 13 27 00 36.7376 126.1328 21.00 16.00 5.00 431363 TAP 2017 08 18 06 25 00 2578-99 G co CCGG 167.740 -999.990 ... V2 2017 09 29 10 49 00 36.7376 126.1328 21.00 16.00 5.00 431343 TAP 2017 08 18 06 25 00 909-99 G co CCGG 170.580 -999.990 ... V2 2017 09 29 10 33 00 36.7376 126.1328 21.00 16.00 5.00 431342 TAP 2017 08 18 06 34 00 317-99 G co CCGG 169.330 -999.990 ... V2 2017 09 29 11 04 00 36.7376 126.1328 21.00 16.00 5.00 431336 TAP 2017 08 18 06 34 00 4696-99 G co CCGG 166.990 -999.990 ... V2 2017 09 29 11 20 00 36.7376 126.1328 21.00 16.00 5.00 431337 TAP 2017 08 23 06 50 00 1106-99 G co CCGG 63.130 -999.990 ... V2 2017 10 13 15 44 00 36.7376 126.1328 21.00 16.00 5.00 432327 TAP 2017 08 23 06 50 00 4270-99 G co CCGG 61.950 -999.990 ... V2 2017 10 13 16 00 00 36.7376 126.1328 21.00 16.00 5.00 432328 TAP 2017 08 23 07 05 00 1517-99 G co CCGG 62.580 -999.990 ... V2 2017 10 13 15 12 00 36.7376 126.1328 21.00 16.00 5.00 432325 TAP 2017 08 23 07 05 00 2556-99 G co CCGG 63.880 -999.990 ... V2 2017 10 13 15 28 00 36.7376 126.1328 21.00 16.00 5.00 432326 TAP 2017 08 30 05 43 00 1081-99 G co CCGG 143.600 -999.990 ... V2 2017 10 12 17 14 00 36.7376 126.1328 21.00 16.00 5.00 432364 TAP 2017 08 30 05 43 00 4994-99 G co CCGG 143.560 -999.990 ... V2 2017 10 12 17 30 00 36.7376 126.1328 21.00 16.00 5.00 432365 TAP 2017 08 30 05 58 00 1165-99 G co CCGG 141.720 -999.990 ... V2 2017 10 13 09 23 00 36.7376 126.1328 21.00 16.00 5.00 432366 TAP 2017 08 30 05 58 00 1236-99 G co CCGG 143.390 -999.990 ... V2 2017 10 13 09 39 00 36.7376 126.1328 21.00 16.00 5.00 432367 TAP 2017 09 03 06 41 00 2323-99 G co CCGG 361.200 -999.990 .X. V2 2017 10 31 12 14 00 36.7376 126.1328 21.00 16.00 5.00 433130 TAP 2017 09 03 06 41 00 5001-99 G co CCGG 359.450 -999.990 .X. V2 2017 10 31 12 30 00 36.7376 126.1328 21.00 16.00 5.00 433131 TAP 2017 09 03 06 53 00 468-99 G co CCGG 361.640 -999.990 .X. V2 2017 10 31 12 46 00 36.7376 126.1328 21.00 16.00 5.00 433129 TAP 2017 09 03 06 53 00 630-99 G co CCGG 361.910 -999.990 .X. V2 2017 10 31 13 02 00 36.7376 126.1328 21.00 16.00 5.00 433128 TAP 2017 09 14 09 04 00 1342-99 G co CCGG 216.500 -999.990 ... V2 2017 10 31 14 37 00 36.7376 126.1328 21.00 16.00 5.00 433133 TAP 2017 09 14 09 04 00 651-99 G co CCGG 217.750 -999.990 ... V2 2017 10 31 14 21 00 36.7376 126.1328 21.00 16.00 5.00 433132 TAP 2017 09 14 09 19 00 4672-99 G co CCGG 207.960 -999.990 ... V2 2017 10 31 13 18 00 36.7376 126.1328 21.00 16.00 5.00 433134 TAP 2017 09 14 09 19 00 5257-99 G co CCGG 207.080 -999.990 ... V2 2017 10 31 13 33 00 36.7376 126.1328 21.00 16.00 5.00 433135 TAP 2017 09 19 07 08 00 2022-99 G co CCGG 520.680 -999.990 .XC V2 2017 11 21 12 27 00 36.7376 126.1328 21.00 16.00 5.00 434428 TAP 2017 09 19 07 08 00 389-99 G co CCGG 519.460 -999.990 .XC V2 2017 11 21 12 11 00 36.7376 126.1328 21.00 16.00 5.00 434429 TAP 2017 09 19 07 20 00 1779-99 G co CCGG 521.700 -999.990 .XC V2 2017 11 21 12 58 00 36.7376 126.1328 21.00 16.00 5.00 434424 TAP 2017 09 19 07 20 00 5274-99 G co CCGG 519.780 -999.990 .XC V2 2017 11 21 13 14 00 36.7376 126.1328 21.00 16.00 5.00 434425 TAP 2017 09 27 02 35 00 1808-99 G co CCGG 688.960 -999.990 P.. V2 2017 11 20 11 21 00 36.7376 126.1328 21.00 16.00 5.00 434440 TAP 2017 09 27 02 35 00 3046-99 G co CCGG 705.390 -999.990 P.. V2 2017 11 20 11 37 00 36.7376 126.1328 21.00 16.00 5.00 434441 TAP 2017 09 27 02 45 00 1880-99 G co CCGG 749.250 -999.990 .XC V2 2017 11 20 11 05 00 36.7376 126.1328 21.00 16.00 5.00 434444 TAP 2017 09 27 02 45 00 767-99 G co CCGG 749.110 -999.990 .XC V2 2017 11 20 10 49 00 36.7376 126.1328 21.00 16.00 5.00 434445 TAP 2017 10 03 06 10 00 1945-99 G co CCGG 180.850 -999.990 ... V2 2017 11 20 14 16 00 36.7376 126.1328 21.00 16.00 5.00 434351 TAP 2017 10 03 06 10 00 689-99 G co CCGG 181.360 -999.990 ... V2 2017 11 20 14 00 00 36.7376 126.1328 21.00 16.00 5.00 434352 TAP 2017 10 03 06 24 00 2987-99 G co CCGG 185.860 -999.990 ... V2 2017 11 20 14 47 00 36.7376 126.1328 21.00 16.00 5.00 434354 TAP 2017 10 03 06 24 00 997-99 G co CCGG 185.460 -999.990 ... V2 2017 11 20 14 31 00 36.7376 126.1328 21.00 16.00 5.00 434353 TAP 2017 10 11 04 15 00 344-99 G co CCGG 158.210 -999.990 ... V2 2017 11 21 14 02 00 36.7376 126.1328 21.00 16.00 5.00 434430 TAP 2017 10 11 04 15 00 3974-99 G co CCGG 157.270 -999.990 ... V2 2017 11 21 14 18 00 36.7376 126.1328 21.00 16.00 5.00 434431 TAP 2017 10 11 04 30 00 2990-99 G co CCGG 155.890 -999.990 ... V2 2017 11 21 13 30 00 36.7376 126.1328 21.00 16.00 5.00 434426 TAP 2017 10 11 04 30 00 5612-99 G co CCGG 155.750 -999.990 ... V2 2017 11 21 13 46 00 36.7376 126.1328 21.00 16.00 5.00 434427 TAP 2017 10 19 05 30 00 4317-99 G co CCGG 177.850 -999.990 ... V2 2017 11 21 15 05 00 36.7376 126.1328 21.00 16.00 5.00 434432 TAP 2017 10 19 05 30 00 5325-99 G co CCGG 179.190 -999.990 ... V2 2017 11 21 15 21 00 36.7376 126.1328 21.00 16.00 5.00 434433 TAP 2017 10 19 05 45 00 4488-99 G co CCGG 187.240 -999.990 ... V2 2017 11 21 14 49 00 36.7376 126.1328 21.00 16.00 5.00 434435 TAP 2017 10 19 05 45 00 782-99 G co CCGG 185.890 -999.990 ... V2 2017 11 21 14 33 00 36.7376 126.1328 21.00 16.00 5.00 434434 TAP 2017 10 24 05 15 00 37-99 G co CCGG 252.160 -999.990 N.. V2 2017 11 20 12 25 00 36.7376 126.1328 21.00 16.00 5.00 434446 TAP 2017 10 24 05 15 00 4010-99 G co CCGG 247.640 -999.990 ... V2 2017 11 20 12 40 00 36.7376 126.1328 21.00 16.00 5.00 434447 TAP 2017 10 24 05 30 00 1657-99 G co CCGG 241.140 -999.990 ... V2 2017 11 20 11 53 00 36.7376 126.1328 21.00 16.00 5.00 434442 TAP 2017 10 24 05 30 00 2102-99 G co CCGG 242.280 -999.990 ... V2 2017 11 20 12 09 00 36.7376 126.1328 21.00 16.00 5.00 434443 TAP 2017 11 05 05 40 00 1869-99 G co CCGG 280.400 -999.990 ... V2 2018 02 09 12 15 00 36.7376 126.1328 21.00 16.00 5.00 437884 TAP 2017 11 05 05 40 00 2338-99 G co CCGG 278.090 -999.990 ... V2 2018 02 09 12 31 00 36.7376 126.1328 21.00 16.00 5.00 437885 TAP 2017 11 05 05 55 00 2321-99 G co CCGG 279.090 -999.990 ... V2 2018 02 09 12 47 00 36.7376 126.1328 21.00 16.00 5.00 437888 TAP 2017 11 05 05 55 00 4150-99 G co CCGG 278.220 -999.990 ... V2 2018 02 09 13 03 00 36.7376 126.1328 21.00 16.00 5.00 437889 TAP 2017 11 18 04 45 00 2077-99 G co CCGG 164.340 -999.990 ... V2 2018 02 09 11 12 00 36.7376 126.1328 21.00 16.00 5.00 437886 TAP 2017 11 18 04 45 00 4905-99 G co CCGG 163.900 -999.990 ... V2 2018 02 09 11 28 00 36.7376 126.1328 21.00 16.00 5.00 437887 TAP 2017 11 18 04 59 00 2145-99 G co CCGG 164.800 -999.990 ... V2 2018 02 09 11 59 00 36.7376 126.1328 21.00 16.00 5.00 437883 TAP 2017 11 18 04 59 00 489-99 G co CCGG 165.500 -999.990 ... V2 2018 02 09 11 43 00 36.7376 126.1328 21.00 16.00 5.00 437882 TAP 2017 11 24 04 34 00 2644-99 G co CCGG 202.640 -999.990 ... V2 2018 02 05 10 56 00 36.7376 126.1328 21.00 16.00 5.00 437657 TAP 2017 11 24 04 34 00 3118-99 G co CCGG 197.990 -999.990 N.. V2 2018 02 05 11 12 00 36.7376 126.1328 21.00 16.00 5.00 437658 TAP 2017 11 24 04 48 00 4216-99 G co CCGG 198.760 -999.990 ... V2 2018 02 05 10 25 00 36.7376 126.1328 21.00 16.00 5.00 437661 TAP 2017 11 24 04 48 00 4605-99 G co CCGG 199.920 -999.990 ... V2 2018 02 05 10 41 00 36.7376 126.1328 21.00 16.00 5.00 437662 TAP 2017 12 12 05 30 00 4614-99 G co CCGG 223.680 -999.990 ... V2 2018 02 05 11 50 00 36.7376 126.1328 21.00 16.00 5.00 437660 TAP 2017 12 12 05 30 00 4832-99 G co CCGG 225.730 -999.990 ... V2 2018 02 05 11 34 00 36.7376 126.1328 21.00 16.00 5.00 437659 TAP 2017 12 12 05 50 00 4396-99 G co CCGG 221.500 -999.990 ... V2 2018 02 05 12 54 00 36.7376 126.1328 21.00 16.00 5.00 437663 TAP 2017 12 12 05 50 00 4996-99 G co CCGG 219.970 -999.990 ... V2 2018 02 05 12 38 00 36.7376 126.1328 21.00 16.00 5.00 437664 TAP 2018 01 02 04 12 00 1132-99 G co CCGG 342.880 -999.990 ... V2 2018 02 07 09 34 00 36.7376 126.1328 21.00 16.00 5.00 437665 TAP 2018 01 02 04 12 00 3506-99 G co CCGG 340.670 -999.990 ... V2 2018 02 07 09 50 00 36.7376 126.1328 21.00 16.00 5.00 437666 TAP 2018 01 02 04 23 00 1968-99 G co CCGG 314.080 -999.990 ... V2 2018 02 07 09 02 00 36.7376 126.1328 21.00 16.00 5.00 437667 TAP 2018 01 02 04 23 00 3190-99 G co CCGG 315.040 -999.990 ... V2 2018 02 07 09 18 00 36.7376 126.1328 21.00 16.00 5.00 437668 TAP 2018 02 05 06 32 00 5413-99 G co CCGG 329.400 -999.990 ... V2 2018 03 12 13 52 00 36.7376 126.1328 21.00 16.00 5.00 439816 TAP 2018 02 05 06 32 00 5651-99 G co CCGG 330.630 -999.990 ... V2 2018 03 12 14 08 00 36.7376 126.1328 21.00 16.00 5.00 439817 TAP 2018 02 05 06 47 00 2671-99 G co CCGG 327.960 -999.990 ... V2 2018 03 12 14 24 00 36.7376 126.1328 21.00 16.00 5.00 439818 TAP 2018 02 05 06 47 00 4474-99 G co CCGG 328.160 -999.990 ... V2 2018 03 12 14 39 00 36.7376 126.1328 21.00 16.00 5.00 439819 TAP 2018 02 11 05 30 00 5827-99 G co CCGG 190.640 -999.990 ... V2 2018 03 09 13 19 00 36.7376 126.1328 21.00 16.00 5.00 439822 TAP 2018 02 11 05 30 00 5858-99 G co CCGG 191.060 -999.990 ... V2 2018 03 09 13 35 00 36.7376 126.1328 21.00 16.00 5.00 439823 TAP 2018 02 11 05 50 00 5886-99 G co CCGG 191.780 -999.990 ... V2 2018 03 09 12 48 00 36.7376 126.1328 21.00 16.00 5.00 439820 TAP 2018 02 11 05 50 00 5887-99 G co CCGG 189.380 -999.990 ... V2 2018 03 09 13 03 00 36.7376 126.1328 21.00 16.00 5.00 439821 TAP 2018 02 23 05 30 00 2589-99 G co CCGG 477.600 -999.990 N.. V2 2018 04 11 13 51 00 36.7376 126.1328 21.00 16.00 5.00 441285 TAP 2018 02 23 05 30 00 688-99 G co CCGG 479.720 -999.990 N.. V2 2018 04 11 14 06 00 36.7376 126.1328 21.00 16.00 5.00 441286 TAP 2018 02 23 05 45 00 3246-99 G co CCGG 493.680 -999.990 .X. V2 2018 04 11 13 19 00 36.7376 126.1328 21.00 16.00 5.00 441281 TAP 2018 02 23 05 45 00 4953-99 G co CCGG 486.870 -999.990 N.. V2 2018 04 11 13 35 00 36.7376 126.1328 21.00 16.00 5.00 441282 TAP 2018 02 26 08 52 00 2158-99 G co CCGG 294.800 -999.990 ... V2 2018 04 11 09 21 00 36.7376 126.1328 21.00 16.00 5.00 441276 TAP 2018 02 26 08 52 00 499-99 G co CCGG 295.780 -999.990 ... V2 2018 04 11 09 05 00 36.7376 126.1328 21.00 16.00 5.00 441275 TAP 2018 02 26 09 02 00 2601-99 G co CCGG 292.660 -999.990 N.. V2 2018 04 11 09 37 00 36.7376 126.1328 21.00 16.00 5.00 441273 TAP 2018 02 26 09 02 00 4631-99 G co CCGG 288.540 -999.990 N.. V2 2018 04 11 09 53 00 36.7376 126.1328 21.00 16.00 5.00 441274 TAP 2018 03 01 04 50 00 1315-99 G co CCGG 353.310 -999.990 ... V2 2018 04 10 17 30 00 36.7376 126.1328 21.00 16.00 5.00 441257 TAP 2018 03 01 04 50 00 527-99 G co CCGG 350.880 -999.990 ... V2 2018 04 10 17 46 00 36.7376 126.1328 21.00 16.00 5.00 441258 TAP 2018 03 01 05 02 00 4920-99 G co CCGG 351.910 -999.990 ... V2 2018 04 11 08 34 00 36.7376 126.1328 21.00 16.00 5.00 441259 TAP 2018 03 01 05 02 00 5255-99 G co CCGG 353.480 -999.990 ... V2 2018 04 11 08 49 00 36.7376 126.1328 21.00 16.00 5.00 441260 TAP 2018 03 05 07 37 00 1581-99 G co CCGG 193.110 -999.990 ... V2 2018 04 11 14 54 00 36.7376 126.1328 21.00 16.00 5.00 441283 TAP 2018 03 05 07 37 00 4667-99 G co CCGG 191.980 -999.990 ... V2 2018 04 11 15 10 00 36.7376 126.1328 21.00 16.00 5.00 441284 TAP 2018 03 05 07 51 00 1848-99 G co CCGG 192.770 -999.990 ... V2 2018 04 11 14 22 00 36.7376 126.1328 21.00 16.00 5.00 441287 TAP 2018 03 05 07 51 00 4492-99 G co CCGG 192.590 -999.990 ... V2 2018 04 11 14 38 00 36.7376 126.1328 21.00 16.00 5.00 441288 TAP 2018 03 14 04 25 00 1912-99 G co CCGG 150.190 -999.990 ... V2 2018 04 18 13 58 00 36.7376 126.1328 21.00 16.00 5.00 441687 TAP 2018 03 14 04 25 00 4609-99 G co CCGG 151.100 -999.990 ... V2 2018 04 18 14 14 00 36.7376 126.1328 21.00 16.00 5.00 441688 TAP 2018 03 14 04 40 00 1360-99 G co CCGG 148.380 -999.990 ... V2 2018 04 18 14 30 00 36.7376 126.1328 21.00 16.00 5.00 441689 TAP 2018 03 14 04 40 00 3988-99 G co CCGG 148.150 -999.990 ... V2 2018 04 18 14 46 00 36.7376 126.1328 21.00 16.00 5.00 441690 TAP 2018 03 16 05 28 00 5890-99 G co CCGG 234.480 -999.990 ... V2 2018 04 18 12 55 00 36.7376 126.1328 21.00 16.00 5.00 441684 TAP 2018 03 16 05 28 00 5892-99 G co CCGG 234.230 -999.990 ... V2 2018 04 18 13 11 00 36.7376 126.1328 21.00 16.00 5.00 441683 TAP 2018 03 16 05 37 00 5453-99 G co CCGG 230.660 -999.990 ... V2 2018 04 18 13 27 00 36.7376 126.1328 21.00 16.00 5.00 441685 TAP 2018 03 16 05 37 00 5571-99 G co CCGG 232.210 -999.990 ... V2 2018 04 18 13 42 00 36.7376 126.1328 21.00 16.00 5.00 441686 TAP 2018 03 20 06 08 00 5268-99 G co CCGG 201.730 -999.990 N.. V2 2018 04 24 16 30 00 36.7376 126.1328 21.00 16.00 5.00 441972 TAP 2018 03 20 06 08 00 5463-99 G co CCGG 193.740 -999.990 N.. V2 2018 04 24 16 46 00 36.7376 126.1328 21.00 16.00 5.00 441973 TAP 2018 03 20 06 17 00 4571-99 G co CCGG 236.180 -999.990 ... V2 2018 04 24 15 59 00 36.7376 126.1328 21.00 16.00 5.00 441970 TAP 2018 03 20 06 17 00 5086-99 G co CCGG 238.140 -999.990 ... V2 2018 04 24 16 14 00 36.7376 126.1328 21.00 16.00 5.00 441971 TAP 2018 03 22 06 25 00 1981-99 G co CCGG 352.090 -999.990 ... V2 2018 04 24 15 27 00 36.7376 126.1328 21.00 16.00 5.00 441968 TAP 2018 03 22 06 25 00 2740-99 G co CCGG 349.770 -999.990 ... V2 2018 04 24 15 43 00 36.7376 126.1328 21.00 16.00 5.00 441969 TAP 2018 03 22 06 40 00 406-99 G co CCGG 358.580 -999.990 ... V2 2018 04 24 14 55 00 36.7376 126.1328 21.00 16.00 5.00 441966 TAP 2018 03 22 06 40 00 4777-99 G co CCGG 357.940 -999.990 ... V2 2018 04 24 15 11 00 36.7376 126.1328 21.00 16.00 5.00 441967 TAP 2018 04 04 05 15 00 4154-99 G co CCGG 243.210 -999.990 ... V2 2018 05 08 16 59 00 36.7376 126.1328 21.00 16.00 5.00 442877 TAP 2018 04 04 05 15 00 600-99 G co CCGG 242.980 -999.990 ... V2 2018 05 08 16 43 00 36.7376 126.1328 21.00 16.00 5.00 442876 TAP 2018 04 04 05 28 00 2728-99 G co CCGG 244.840 -999.990 ... V2 2018 05 08 16 27 00 36.7376 126.1328 21.00 16.00 5.00 442880 TAP 2018 04 04 05 28 00 423-99 G co CCGG 243.240 -999.990 ... V2 2018 05 08 16 11 00 36.7376 126.1328 21.00 16.00 5.00 442881 TAP 2018 04 09 08 30 00 3609-99 G co CCGG 336.470 -999.990 ... V2 2018 05 08 15 23 00 36.7376 126.1328 21.00 16.00 5.00 442879 TAP 2018 04 09 08 30 00 629-99 G co CCGG 337.300 -999.990 ... V2 2018 05 08 15 08 00 36.7376 126.1328 21.00 16.00 5.00 442878 TAP 2018 04 09 08 45 00 213-99 G co CCGG 362.270 -999.990 ... V2 2018 05 08 15 39 00 36.7376 126.1328 21.00 16.00 5.00 442874 TAP 2018 04 09 08 45 00 819-99 G co CCGG 359.200 -999.990 ... V2 2018 05 08 15 55 00 36.7376 126.1328 21.00 16.00 5.00 442875 TAP 2018 04 14 07 55 00 4006-99 G co CCGG 219.050 -999.990 ... V2 2018 05 23 14 51 00 36.7376 126.1328 21.00 16.00 5.00 443452 TAP 2018 04 14 08 10 00 4395-99 G co CCGG 175.170 -999.990 ... V2 2018 05 22 12 38 00 36.7376 126.1328 21.00 16.00 5.00 443450 TAP 2018 04 14 08 10 00 4967-99 G co CCGG 174.400 -999.990 ... V2 2018 05 22 12 54 00 36.7376 126.1328 21.00 16.00 5.00 443451 TAP 2018 04 16 04 04 00 4480-99 G co CCGG 250.200 -999.990 ... V2 2018 05 09 10 42 00 36.7376 126.1328 21.00 16.00 5.00 442864 TAP 2018 04 16 04 04 00 5278-99 G co CCGG 253.010 -999.990 ... V2 2018 05 09 10 58 00 36.7376 126.1328 21.00 16.00 5.00 442865 TAP 2018 04 16 06 17 00 1465-99 G co CCGG 245.420 -999.990 ... V2 2018 05 09 10 11 00 36.7376 126.1328 21.00 16.00 5.00 442862 TAP 2018 04 16 06 17 00 4926-99 G co CCGG 242.690 -999.990 ... V2 2018 05 09 10 26 00 36.7376 126.1328 21.00 16.00 5.00 442863 TAP 2018 04 25 03 32 00 1441-99 G co CCGG 221.870 -999.990 ... V2 2018 05 25 10 05 00 36.7376 126.1328 21.00 16.00 5.00 443446 TAP 2018 04 25 03 32 00 1819-99 G co CCGG 222.800 -999.990 ... V2 2018 05 25 10 21 00 36.7376 126.1328 21.00 16.00 5.00 443447 TAP 2018 04 25 03 47 00 192-99 G co CCGG 222.680 -999.990 ... V2 2018 05 25 10 37 00 36.7376 126.1328 21.00 16.00 5.00 443448 TAP 2018 04 25 03 47 00 3906-99 G co CCGG 224.110 -999.990 ... V2 2018 05 25 10 52 00 36.7376 126.1328 21.00 16.00 5.00 443449 TAP 2018 05 03 05 31 00 2706-99 G co CCGG 288.550 -999.990 ... V2 2018 06 21 09 36 00 36.7376 126.1328 21.00 16.00 5.00 445367 TAP 2018 05 03 05 31 00 5115-99 G co CCGG 290.320 -999.990 ... V2 2018 06 21 09 51 00 36.7376 126.1328 21.00 16.00 5.00 445368 TAP 2018 05 03 05 46 00 2822-99 G co CCGG 292.830 -999.990 ... V2 2018 06 21 09 04 00 36.7376 126.1328 21.00 16.00 5.00 445363 TAP 2018 05 03 05 46 00 4918-99 G co CCGG 293.430 -999.990 ... V2 2018 06 21 09 20 00 36.7376 126.1328 21.00 16.00 5.00 445364 TAP 2018 05 09 05 19 00 1553-99 G co CCGG 208.080 -999.990 ... V2 2018 06 26 13 47 00 36.7376 126.1328 21.00 16.00 5.00 445438 TAP 2018 05 09 05 19 00 5677-99 G co CCGG 209.000 -999.990 ... V2 2018 06 26 14 03 00 36.7376 126.1328 21.00 16.00 5.00 445439 TAP 2018 05 09 05 25 00 452-99 G co CCGG 204.680 -999.990 ... V2 2018 06 26 14 18 00 36.7376 126.1328 21.00 16.00 5.00 445440 TAP 2018 05 09 05 25 00 4827-99 G co CCGG 203.050 -999.990 ... V2 2018 06 26 14 34 00 36.7376 126.1328 21.00 16.00 5.00 445441 TAP 2018 05 13 05 00 00 2500-99 G co CCGG 226.460 -999.990 N.. V2 2018 06 20 13 43 00 36.7376 126.1328 21.00 16.00 5.00 445358 TAP 2018 05 13 05 00 00 99-99 G co CCGG 214.140 -999.990 N.. V2 2018 06 20 13 27 00 36.7376 126.1328 21.00 16.00 5.00 445357 TAP 2018 05 13 05 15 00 1357-99 G co CCGG 211.880 -999.990 ... V2 2018 06 20 12 56 00 36.7376 126.1328 21.00 16.00 5.00 445359 TAP 2018 05 13 05 15 00 2597-99 G co CCGG 210.120 -999.990 ... V2 2018 06 20 13 12 00 36.7376 126.1328 21.00 16.00 5.00 445360 TAP 2018 05 19 05 19 00 3272-99 G co CCGG 236.830 -999.990 N.. V2 2018 06 26 10 06 00 36.7376 126.1328 21.00 16.00 5.00 445434 TAP 2018 05 19 05 19 00 4878-99 G co CCGG 229.370 -999.990 N.. V2 2018 06 26 10 21 00 36.7376 126.1328 21.00 16.00 5.00 445435 TAP 2018 05 19 05 30 00 1993-99 G co CCGG 229.950 -999.990 N.. V2 2018 06 26 10 37 00 36.7376 126.1328 21.00 16.00 5.00 445432 TAP 2018 05 19 05 30 00 3766-99 G co CCGG 225.200 -999.990 N.. V2 2018 06 26 10 53 00 36.7376 126.1328 21.00 16.00 5.00 445433 TAP 2018 05 23 08 05 00 2726-99 G co CCGG 242.030 -999.990 ... V2 2018 06 20 16 37 00 36.7376 126.1328 21.00 16.00 5.00 445365 TAP 2018 05 23 08 05 00 4265-99 G co CCGG 240.770 -999.990 ... V2 2018 06 20 16 53 00 36.7376 126.1328 21.00 16.00 5.00 445366 TAP 2018 05 23 08 20 00 2239-99 G co CCGG 242.140 -999.990 ... V2 2018 06 20 16 05 00 36.7376 126.1328 21.00 16.00 5.00 445361 TAP 2018 05 23 08 20 00 5679-99 G co CCGG 243.530 -999.990 ... V2 2018 06 20 16 21 00 36.7376 126.1328 21.00 16.00 5.00 445362 TAP 2018 06 05 06 37 00 1952-99 G co CCGG 203.070 -999.990 ... V2 2018 07 25 14 42 00 36.7376 126.1328 21.00 16.00 5.00 446828 TAP 2018 06 05 06 37 00 4271-99 G co CCGG 203.520 -999.990 ... V2 2018 07 25 14 58 00 36.7376 126.1328 21.00 16.00 5.00 446829 TAP 2018 06 05 06 52 00 2531-99 G co CCGG 198.770 -999.990 ... V2 2018 07 25 15 13 00 36.7376 126.1328 21.00 16.00 5.00 446832 TAP 2018 06 05 06 52 00 4766-99 G co CCGG 199.290 -999.990 ... V2 2018 07 25 15 29 00 36.7376 126.1328 21.00 16.00 5.00 446833 TAP 2018 06 10 04 25 00 1848-99 G co CCGG 171.280 -999.990 ... V2 2018 07 25 16 17 00 36.7376 126.1328 21.00 16.00 5.00 446834 TAP 2018 06 10 04 25 00 2721-99 G co CCGG 172.550 -999.990 ... V2 2018 07 25 16 32 00 36.7376 126.1328 21.00 16.00 5.00 446835 TAP 2018 06 10 04 40 00 4492-99 G co CCGG 167.120 -999.990 ... V2 2018 07 25 15 45 00 36.7376 126.1328 21.00 16.00 5.00 446830 TAP 2018 06 10 04 40 00 5835-99 G co CCGG 167.480 -999.990 ... V2 2018 07 25 16 01 00 36.7376 126.1328 21.00 16.00 5.00 446831 TAP 2018 06 14 04 13 00 3336-99 G co CCGG 225.650 -999.990 ... V2 2018 07 24 12 17 00 36.7376 126.1328 21.00 16.00 5.00 446698 TAP 2018 06 14 04 13 00 3415-99 G co CCGG 225.990 -999.990 ... V2 2018 07 24 12 33 00 36.7376 126.1328 21.00 16.00 5.00 446699 TAP 2018 06 14 04 28 00 3246-99 G co CCGG 227.170 -999.990 ... V2 2018 07 24 12 48 00 36.7376 126.1328 21.00 16.00 5.00 446700 TAP 2018 06 14 04 28 00 4899-99 G co CCGG 226.780 -999.990 ... V2 2018 07 24 13 04 00 36.7376 126.1328 21.00 16.00 5.00 446701 TAP 2018 06 23 09 00 00 1040-99 G co CCGG 198.990 -999.990 ... V2 2018 08 17 16 50 00 36.7376 126.1328 21.00 16.00 5.00 447566 TAP 2018 06 23 09 00 00 826-99 G co CCGG 196.220 -999.990 ... V2 2018 08 17 16 34 00 36.7376 126.1328 21.00 16.00 5.00 447565 TAP 2018 06 23 09 15 00 5886-99 G co CCGG 218.780 -999.990 ... V2 2018 08 17 16 03 00 36.7376 126.1328 21.00 16.00 5.00 447564 TAP 2018 06 29 04 10 00 3786-99 G co CCGG 202.560 -999.990 ... V2 2018 08 21 11 36 00 36.7376 126.1328 21.00 16.00 5.00 447571 TAP 2018 06 29 04 10 00 4574-99 G co CCGG 206.250 -999.990 ... V2 2018 08 21 11 52 00 36.7376 126.1328 21.00 16.00 5.00 447572 TAP 2018 06 29 04 25 00 2480-99 G co CCGG 206.930 -999.990 ... V2 2018 08 21 11 04 00 36.7376 126.1328 21.00 16.00 5.00 447567 TAP 2018 06 29 04 25 00 3290-99 G co CCGG 207.540 -999.990 ... V2 2018 08 21 11 20 00 36.7376 126.1328 21.00 16.00 5.00 447568 TAP 2018 07 04 05 14 00 5415-99 G co CCGG 128.630 -999.990 ... V2 2018 08 22 15 08 00 36.7376 126.1328 21.00 16.00 5.00 447655 TAP 2018 07 04 05 14 00 966-99 G co CCGG 128.140 -999.990 ... V2 2018 08 22 14 53 00 36.7376 126.1328 21.00 16.00 5.00 447656 TAP 2018 07 04 05 40 00 1828-99 G co CCGG 132.490 -999.990 ... V2 2018 08 22 14 21 00 36.7376 126.1328 21.00 16.00 5.00 447657 TAP 2018 07 04 05 40 00 5319-99 G co CCGG 130.440 -999.990 ... V2 2018 08 22 14 37 00 36.7376 126.1328 21.00 16.00 5.00 447658 TAP 2018 07 07 05 10 00 1159-99 G co CCGG 140.900 -999.990 ... V2 2018 08 21 12 55 00 36.7376 126.1328 21.00 16.00 5.00 447573 TAP 2018 07 07 05 10 00 586-99 G co CCGG 144.600 -999.990 ... V2 2018 08 21 12 40 00 36.7376 126.1328 21.00 16.00 5.00 447574 TAP 2018 07 07 05 25 00 2131-99 G co CCGG 161.670 -999.990 ... V2 2018 08 21 12 24 00 36.7376 126.1328 21.00 16.00 5.00 447569 TAP 2018 07 07 05 25 00 561-99 G co CCGG 163.220 -999.990 ... V2 2018 08 21 12 08 00 36.7376 126.1328 21.00 16.00 5.00 447570 TAP 2018 07 13 05 14 00 4378-99 G co CCGG 70.690 -999.990 ... V2 2018 08 17 14 59 00 36.7376 126.1328 21.00 16.00 5.00 447560 TAP 2018 07 13 05 14 00 4863-99 G co CCGG 69.450 -999.990 ... V2 2018 08 17 15 15 00 36.7376 126.1328 21.00 16.00 5.00 447561 TAP 2018 07 13 05 29 00 3768-99 G co CCGG 74.210 -999.990 ... V2 2018 08 17 15 47 00 36.7376 126.1328 21.00 16.00 5.00 447563 TAP 2018 07 13 05 29 00 911-99 G co CCGG 73.270 -999.990 ... V2 2018 08 17 15 31 00 36.7376 126.1328 21.00 16.00 5.00 447562 TAP 2018 07 18 06 10 00 3686-99 G co CCGG 75.270 -999.990 ... V2 2018 08 22 12 45 00 36.7376 126.1328 21.00 16.00 5.00 447829 TAP 2018 07 18 06 10 00 5286-99 G co CCGG 74.890 -999.990 ... V2 2018 08 22 13 01 00 36.7376 126.1328 21.00 16.00 5.00 447830 TAP 2018 07 18 06 25 00 3439-99 G co CCGG 75.540 -999.990 ... V2 2018 08 22 11 26 00 36.7376 126.1328 21.00 16.00 5.00 447832 TAP 2018 07 18 06 25 00 889-99 G co CCGG 75.400 -999.990 ... V2 2018 08 22 11 10 00 36.7376 126.1328 21.00 16.00 5.00 447831 TAP 2018 07 24 07 00 00 1907-99 G co CCGG 87.100 -999.990 ... V2 2018 09 11 13 38 00 36.7376 126.1328 21.00 16.00 5.00 448836 TAP 2018 07 24 07 00 00 4935-99 G co CCGG 86.010 -999.990 ... V2 2018 09 11 13 54 00 36.7376 126.1328 21.00 16.00 5.00 448837 TAP 2018 07 24 07 15 00 1746-99 G co CCGG 95.210 -999.990 ... V2 2018 09 11 13 07 00 36.7376 126.1328 21.00 16.00 5.00 448838 TAP 2018 07 24 07 15 00 3282-99 G co CCGG 91.930 -999.990 ... V2 2018 09 11 13 23 00 36.7376 126.1328 21.00 16.00 5.00 448839 TAP 2018 07 30 08 10 00 3298-99 G co CCGG 150.170 -999.990 ... V2 2018 09 12 14 17 00 36.7376 126.1328 21.00 16.00 5.00 448850 TAP 2018 07 30 08 10 00 4006-99 G co CCGG 149.880 -999.990 ... V2 2018 09 12 14 33 00 36.7376 126.1328 21.00 16.00 5.00 448851 TAP 2018 07 30 08 25 00 194-99 G co CCGG 151.750 -999.990 ... V2 2018 09 12 13 46 00 36.7376 126.1328 21.00 16.00 5.00 448848 TAP 2018 07 30 08 25 00 4853-99 G co CCGG 150.490 -999.990 ... V2 2018 09 12 14 01 00 36.7376 126.1328 21.00 16.00 5.00 448849 TAP 2018 08 07 06 50 00 1920-99 G co CCGG 102.820 -999.990 ... V2 2018 09 20 17 02 00 36.7376 126.1328 21.00 16.00 5.00 449200 TAP 2018 08 07 06 50 00 2707-99 G co CCGG 102.280 -999.990 ... V2 2018 09 20 17 17 00 36.7376 126.1328 21.00 16.00 5.00 449201 TAP 2018 08 07 07 05 00 4192-99 G co CCGG 104.620 -999.990 ... V2 2018 09 20 16 30 00 36.7376 126.1328 21.00 16.00 5.00 449198 TAP 2018 08 07 07 05 00 5587-99 G co CCGG 104.060 -999.990 ... V2 2018 09 20 16 46 00 36.7376 126.1328 21.00 16.00 5.00 449199 TAP 2018 08 11 08 35 00 5782-99 G co CCGG 292.390 -999.990 N.. V2 2018 09 24 11 12 00 36.7376 126.1328 21.00 16.00 5.00 449338 TAP 2018 08 11 08 35 00 5893-99 G co CCGG 281.540 -999.990 N.. V2 2018 09 24 11 27 00 36.7376 126.1328 21.00 16.00 5.00 449339 TAP 2018 08 11 08 50 00 240-99 G co CCGG 272.910 -999.990 ... V2 2018 09 24 10 40 00 36.7376 126.1328 21.00 16.00 5.00 449336 TAP 2018 08 11 08 50 00 4980-99 G co CCGG 269.950 -999.990 ... V2 2018 09 24 10 56 00 36.7376 126.1328 21.00 16.00 5.00 449337 TAP 2018 08 18 06 05 00 1996-99 G co CCGG 170.860 -999.990 ... V2 2018 09 21 09 39 00 36.7376 126.1328 21.00 16.00 5.00 449330 TAP 2018 08 18 06 05 00 2951-99 G co CCGG 171.540 -999.990 ... V2 2018 09 21 09 54 00 36.7376 126.1328 21.00 16.00 5.00 449331 TAP 2018 08 18 06 20 00 1130-99 G co CCGG 156.420 -999.990 ... V2 2018 09 21 10 10 00 36.7376 126.1328 21.00 16.00 5.00 449328 TAP 2018 08 18 06 20 00 5630-99 G co CCGG 157.400 -999.990 ... V2 2018 09 21 10 26 00 36.7376 126.1328 21.00 16.00 5.00 449329 TAP 2018 08 31 08 59 00 526-99 G co CCGG 201.250 -999.990 ... V2 2018 11 08 12 17 00 36.7376 126.1328 21.00 16.00 5.00 451155 TAP 2018 08 31 08 59 00 738-99 G co CCGG 199.970 -999.990 ... V2 2018 11 08 12 33 00 36.7376 126.1328 21.00 16.00 5.00 451156 TAP 2018 08 31 09 14 00 1000-99 G co CCGG 201.030 -999.990 ... V2 2018 11 08 12 49 00 36.7376 126.1328 21.00 16.00 5.00 451153 TAP 2018 08 31 09 14 00 4331-99 G co CCGG 200.240 -999.990 ... V2 2018 11 08 13 04 00 36.7376 126.1328 21.00 16.00 5.00 451160 TAP 2018 09 05 03 30 00 1371-99 G co CCGG 196.570 -999.990 N.. V2 2018 11 08 10 42 00 36.7376 126.1328 21.00 16.00 5.00 451133 TAP 2018 09 05 03 30 00 5243-99 G co CCGG 163.740 -999.990 N.. V2 2018 11 08 10 58 00 36.7376 126.1328 21.00 16.00 5.00 451134 TAP 2018 09 05 04 40 00 2318-99 G co CCGG 251.410 -999.990 ... V2 2018 11 08 08 36 00 36.7376 126.1328 21.00 16.00 5.00 451147 TAP 2018 09 05 04 40 00 2336-99 G co CCGG 248.550 -999.990 ... V2 2018 11 08 08 52 00 36.7376 126.1328 21.00 16.00 5.00 451148 TAP 2018 09 15 08 00 00 2533-99 G co CCGG 340.630 -999.990 ... V2 2018 11 08 11 30 00 36.7376 126.1328 21.00 16.00 5.00 451150 TAP 2018 09 15 08 00 00 726-99 G co CCGG 337.270 -999.990 ... V2 2018 11 08 11 14 00 36.7376 126.1328 21.00 16.00 5.00 451149 TAP 2018 09 15 08 20 00 1315-99 G co CCGG 324.300 -999.990 ... V2 2018 11 08 10 26 00 36.7376 126.1328 21.00 16.00 5.00 451152 TAP 2018 09 15 08 20 00 339-99 G co CCGG 324.940 -999.990 ... V2 2018 11 08 10 11 00 36.7376 126.1328 21.00 16.00 5.00 451151 TAP 2018 09 27 05 01 00 3023-99 G co CCGG 296.270 -999.990 ... V2 2018 11 07 15 26 00 36.7376 126.1328 21.00 16.00 5.00 451121 TAP 2018 09 27 05 01 00 5579-99 G co CCGG 293.440 -999.990 ... V2 2018 11 07 15 42 00 36.7376 126.1328 21.00 16.00 5.00 451122 TAP 2018 09 27 05 14 00 1464-99 G co CCGG 267.580 -999.990 ... V2 2018 11 07 14 55 00 36.7376 126.1328 21.00 16.00 5.00 451119 TAP 2018 09 27 05 14 00 1644-99 G co CCGG 265.600 -999.990 ... V2 2018 11 07 15 10 00 36.7376 126.1328 21.00 16.00 5.00 451120 TAP 2018 10 07 04 25 00 3325-99 G co CCGG 123.810 -999.990 ... V2 2018 11 08 13 52 00 36.7376 126.1328 21.00 16.00 5.00 451157 TAP 2018 10 07 04 25 00 5583-99 G co CCGG 127.350 -999.990 ... V2 2018 11 08 14 08 00 36.7376 126.1328 21.00 16.00 5.00 451158 TAP 2018 10 07 04 39 00 1320-99 G co CCGG 124.060 -999.990 ... V2 2018 11 08 13 20 00 36.7376 126.1328 21.00 16.00 5.00 451159 TAP 2018 10 07 04 39 00 3441-99 G co CCGG 125.280 -999.990 ... V2 2018 11 08 13 36 00 36.7376 126.1328 21.00 16.00 5.00 451154 TAP 2018 10 19 05 07 00 3281-99 G co CCGG 247.660 -999.990 N.. V2 2019 01 24 11 08 00 36.7376 126.1328 21.00 16.00 5.00 453480 TAP 2018 10 19 05 07 00 3976-99 G co CCGG 243.180 -999.990 N.. V2 2019 01 24 11 24 00 36.7376 126.1328 21.00 16.00 5.00 453481 TAP 2018 10 19 05 20 00 440-99 G co CCGG 175.790 -999.990 ... V2 2019 01 24 10 52 00 36.7376 126.1328 21.00 16.00 5.00 453479 TAP 2018 10 19 05 20 00 610-99 G co CCGG 175.360 -999.990 ... V2 2019 01 24 10 36 00 36.7376 126.1328 21.00 16.00 5.00 453478 TAP 2018 10 27 04 50 00 390-99 G co CCGG 129.710 -999.990 ... V2 2019 01 23 13 06 00 36.7376 126.1328 21.00 16.00 5.00 453351 TAP 2018 10 27 04 50 00 4983-99 G co CCGG 129.840 -999.990 ... V2 2019 01 23 13 22 00 36.7376 126.1328 21.00 16.00 5.00 453352 TAP 2018 10 27 05 01 00 2152-99 G co CCGG 130.100 -999.990 ... V2 2019 01 23 12 35 00 36.7376 126.1328 21.00 16.00 5.00 453355 TAP 2018 10 27 05 01 00 4353-99 G co CCGG 129.900 -999.990 ... V2 2019 01 23 12 51 00 36.7376 126.1328 21.00 16.00 5.00 453356 TAP 2018 11 10 04 13 00 1840-99 G co CCGG 758.990 -999.990 N.. V2 2019 01 29 11 28 00 36.7376 126.1328 21.00 16.00 5.00 453410 TAP 2018 11 10 04 13 00 5112-99 G co CCGG 750.770 -999.990 N.. V2 2019 01 29 11 44 00 36.7376 126.1328 21.00 16.00 5.00 453411 TAP 2018 11 10 04 28 00 3314-99 G co CCGG 739.370 -999.990 N.. V2 2019 01 29 10 25 00 36.7376 126.1328 21.00 16.00 5.00 453412 TAP 2018 11 10 04 28 00 5291-99 G co CCGG 733.760 -999.990 N.. V2 2019 01 29 10 40 00 36.7376 126.1328 21.00 16.00 5.00 453413 TAP 2018 11 17 04 55 00 2971-99 G co CCGG 133.100 -999.990 ... V2 2019 01 22 12 07 00 36.7376 126.1328 21.00 16.00 5.00 453329 TAP 2018 11 17 04 55 00 3388-99 G co CCGG 133.480 -999.990 ... V2 2019 01 22 12 23 00 36.7376 126.1328 21.00 16.00 5.00 453330 TAP 2018 11 17 05 08 00 2046-99 G co CCGG 134.170 -999.990 ... V2 2019 01 22 12 39 00 36.7376 126.1328 21.00 16.00 5.00 453327 TAP 2018 11 17 05 08 00 3523-99 G co CCGG 133.850 -999.990 ... V2 2019 01 22 12 55 00 36.7376 126.1328 21.00 16.00 5.00 453328 TAP 2018 11 30 06 29 00 2334-99 G co CCGG 143.000 -999.990 ... V2 2019 01 23 13 54 00 36.7376 126.1328 21.00 16.00 5.00 453358 TAP 2018 11 30 06 29 00 688-99 G co CCGG 143.070 -999.990 ... V2 2019 01 23 13 38 00 36.7376 126.1328 21.00 16.00 5.00 453357 TAP 2018 11 30 06 37 00 3119-99 G co CCGG 145.310 -999.990 ... V2 2019 01 23 14 10 00 36.7376 126.1328 21.00 16.00 5.00 453353 TAP 2018 11 30 06 37 00 4285-99 G co CCGG 146.260 -999.990 ... V2 2019 01 23 14 25 00 36.7376 126.1328 21.00 16.00 5.00 453354 TAP 2018 12 06 03 26 00 1064-99 G co CCGG 163.220 -999.990 ... V2 2019 02 07 16 13 00 36.7376 126.1328 21.00 16.00 5.00 453945 TAP 2018 12 06 03 26 00 881-99 G co CCGG 160.870 -999.990 ... V2 2019 02 07 15 57 00 36.7376 126.1328 21.00 16.00 5.00 453946 TAP 2018 12 06 03 40 00 2044-99 G co CCGG 159.140 -999.990 ... V2 2019 02 07 15 26 00 36.7376 126.1328 21.00 16.00 5.00 453943 TAP 2018 12 06 03 40 00 4668-99 G co CCGG 159.410 -999.990 ... V2 2019 02 07 15 42 00 36.7376 126.1328 21.00 16.00 5.00 453944 TAP 2018 12 10 05 02 00 1080-99 G co CCGG 425.300 -999.990 .X. V2 2019 03 15 10 16 00 36.7376 126.1328 21.00 16.00 5.00 455729 TAP 2018 12 10 05 02 00 2087-99 G co CCGG 425.060 -999.990 .X. V2 2019 03 15 10 31 00 36.7376 126.1328 21.00 16.00 5.00 455730 TAP 2018 12 10 05 17 00 1599-99 G co CCGG 372.400 -999.990 N.. V2 2019 03 15 09 44 00 36.7376 126.1328 21.00 16.00 5.00 455727 TAP 2018 12 10 05 17 00 3290-99 G co CCGG 379.180 -999.990 N.. V2 2019 03 15 10 00 00 36.7376 126.1328 21.00 16.00 5.00 455728 TAP 2018 12 17 06 15 00 1254-99 G co CCGG 284.630 -999.990 ... V2 2019 02 07 14 23 00 36.7376 126.1328 21.00 16.00 5.00 453939 TAP 2018 12 17 06 15 00 1724-99 G co CCGG 283.120 -999.990 ... V2 2019 02 07 14 38 00 36.7376 126.1328 21.00 16.00 5.00 453940 TAP 2018 12 17 06 30 00 4813-99 G co CCGG 255.930 -999.990 ... V2 2019 02 07 14 07 00 36.7376 126.1328 21.00 16.00 5.00 453942 TAP 2018 12 17 06 30 00 83-99 G co CCGG 257.170 -999.990 ... V2 2019 02 07 13 51 00 36.7376 126.1328 21.00 16.00 5.00 453941 TAP 2018 12 24 05 35 00 4746-99 G co CCGG 211.860 -999.990 ... V2 2019 02 15 18 47 00 36.7376 126.1328 21.00 16.00 5.00 454491 TAP 2018 12 24 05 35 00 4768-99 G co CCGG 210.360 -999.990 ... V2 2019 02 15 19 03 00 36.7376 126.1328 21.00 16.00 5.00 454492 TAP 2018 12 24 05 50 00 4121-99 G co CCGG 209.050 -999.990 ... V2 2019 02 15 19 19 00 36.7376 126.1328 21.00 16.00 5.00 454489 TAP 2018 12 24 05 50 00 576-99 G co CCGG 212.520 -999.990 ... V2 2019 02 15 19 35 00 36.7376 126.1328 21.00 16.00 5.00 454490 TAP 2019 01 01 05 50 00 4034-99 G co CCGG 234.210 -999.990 ... V2 2019 02 19 09 54 00 36.7376 126.1328 21.00 16.00 5.00 454495 TAP 2019 01 01 05 50 00 4991-99 G co CCGG 233.400 -999.990 ... V2 2019 02 19 10 10 00 36.7376 126.1328 21.00 16.00 5.00 454496 TAP 2019 01 01 06 05 00 1805-99 G co CCGG 232.720 -999.990 ... V2 2019 02 19 10 26 00 36.7376 126.1328 21.00 16.00 5.00 454493 TAP 2019 01 01 06 05 00 1818-99 G co CCGG 233.030 -999.990 ... V2 2019 02 19 10 42 00 36.7376 126.1328 21.00 16.00 5.00 454494 TAP 2019 01 06 03 35 00 4203-99 G co CCGG 199.210 -999.990 ... V2 2019 02 15 16 09 00 36.7376 126.1328 21.00 16.00 5.00 454485 TAP 2019 01 06 03 35 00 5457-99 G co CCGG 198.720 -999.990 ... V2 2019 02 15 16 24 00 36.7376 126.1328 21.00 16.00 5.00 454486 TAP 2019 01 06 03 50 00 5433-99 G co CCGG 207.290 -999.990 ... V2 2019 02 15 15 53 00 36.7376 126.1328 21.00 16.00 5.00 454482 TAP 2019 01 06 03 50 00 612-99 G co CCGG 205.820 -999.990 ... V2 2019 02 15 15 37 00 36.7376 126.1328 21.00 16.00 5.00 454481 TAP 2019 01 09 04 50 00 2982-99 G co CCGG 431.050 -999.990 N.. V2 2019 02 15 17 12 00 36.7376 126.1328 21.00 16.00 5.00 454487 TAP 2019 01 09 04 50 00 3539-99 G co CCGG 435.200 -999.990 N.. V2 2019 02 15 17 27 00 36.7376 126.1328 21.00 16.00 5.00 454488 TAP 2019 01 09 05 14 00 35-99 G co CCGG 424.050 -999.990 .X. V2 2019 02 15 16 40 00 36.7376 126.1328 21.00 16.00 5.00 454483 TAP 2019 01 09 05 14 00 4375-99 G co CCGG 423.780 -999.990 .X. V2 2019 02 15 16 56 00 36.7376 126.1328 21.00 16.00 5.00 454484 TAP 2019 01 22 03 00 00 2395-99 G co CCGG 443.420 -999.990 .X. V2 2019 03 22 09 04 00 36.7376 126.1328 21.00 16.00 5.00 455894 TAP 2019 01 22 03 00 00 5484-99 G co CCGG 443.250 -999.990 .X. V2 2019 03 22 09 20 00 36.7376 126.1328 21.00 16.00 5.00 455895 TAP 2019 01 22 03 20 00 1568-99 G co CCGG 447.750 -999.990 .X. V2 2019 03 22 09 36 00 36.7376 126.1328 21.00 16.00 5.00 455892 TAP 2019 01 22 03 20 00 5420-99 G co CCGG 443.860 -999.990 N.. V2 2019 03 22 09 52 00 36.7376 126.1328 21.00 16.00 5.00 455893 TAP 2019 01 26 05 25 00 2759-99 G co CCGG 191.730 -999.990 ... V2 2019 03 08 14 23 00 36.7376 126.1328 21.00 16.00 5.00 455523 TAP 2019 01 26 05 25 00 4230-99 G co CCGG 191.740 -999.990 ... V2 2019 03 08 14 39 00 36.7376 126.1328 21.00 16.00 5.00 455524 TAP 2019 01 26 05 40 00 2922-99 G co CCGG 191.780 -999.990 ... V2 2019 03 08 16 29 00 36.7376 126.1328 21.00 16.00 5.00 455531 TAP 2019 01 26 05 40 00 4826-99 G co CCGG 191.230 -999.990 ... V2 2019 03 08 16 45 00 36.7376 126.1328 21.00 16.00 5.00 455532 TAP 2019 02 01 03 05 00 4271-99 G co CCGG 225.420 -999.990 ... V2 2019 03 08 15 26 00 36.7376 126.1328 21.00 16.00 5.00 455525 TAP 2019 02 01 03 05 00 5286-99 G co CCGG 225.450 -999.990 ... V2 2019 03 08 15 42 00 36.7376 126.1328 21.00 16.00 5.00 455526 TAP 2019 02 01 03 20 00 2480-99 G co CCGG 233.750 -999.990 ... V2 2019 03 08 14 54 00 36.7376 126.1328 21.00 16.00 5.00 455527 TAP 2019 02 01 03 20 00 3686-99 G co CCGG 231.600 -999.990 ... V2 2019 03 08 15 10 00 36.7376 126.1328 21.00 16.00 5.00 455528 TAP 2019 02 25 06 50 00 1330-99 G co CCGG 364.280 -999.990 ... V2 2019 05 08 12 07 00 36.7376 126.1328 21.00 16.00 5.00 457800 TAP 2019 02 25 06 50 00 714-99 G co CCGG 361.190 -999.990 ... V2 2019 05 08 11 51 00 36.7376 126.1328 21.00 16.00 5.00 457799 TAP 2019 02 25 07 05 00 4158-99 G co CCGG 353.570 -999.990 ... V2 2019 05 08 11 19 00 36.7376 126.1328 21.00 16.00 5.00 457797 TAP 2019 02 25 07 05 00 4952-99 G co CCGG 350.120 -999.990 ... V2 2019 05 08 11 35 00 36.7376 126.1328 21.00 16.00 5.00 457798 TAP 2019 03 09 05 35 00 1104-99 G co CCGG 252.900 -999.990 ... V2 2019 05 02 16 16 00 36.7376 126.1328 21.00 16.00 5.00 457816 TAP 2019 03 09 05 35 00 609-99 G co CCGG 252.860 -999.990 ... V2 2019 05 02 16 00 00 36.7376 126.1328 21.00 16.00 5.00 457815 TAP 2019 03 09 05 50 00 115-99 G co CCGG 261.800 -999.990 N.. V2 2019 05 02 16 32 00 36.7376 126.1328 21.00 16.00 5.00 457813 TAP 2019 03 09 05 50 00 2598-99 G co CCGG 267.250 -999.990 N.. V2 2019 05 02 16 48 00 36.7376 126.1328 21.00 16.00 5.00 457814 TAP 2019 03 13 04 05 00 967-99 G co CCGG 185.630 -999.990 ... V2 2019 05 08 13 10 00 36.7376 126.1328 21.00 16.00 5.00 457802 TAP 2019 03 13 04 05 00 992-99 G co CCGG 185.580 -999.990 ... V2 2019 05 08 12 54 00 36.7376 126.1328 21.00 16.00 5.00 457801 TAP 2019 03 13 04 20 00 4767-99 G co CCGG 187.240 -999.990 ... V2 2019 05 08 12 23 00 36.7376 126.1328 21.00 16.00 5.00 457803 TAP 2019 03 13 04 20 00 5649-99 G co CCGG 187.030 -999.990 ... V2 2019 05 08 12 38 00 36.7376 126.1328 21.00 16.00 5.00 457804 TAP 2019 03 21 05 05 00 3845-99 G co CCGG 312.720 -999.990 ... V2 2019 05 08 13 26 00 36.7376 126.1328 21.00 16.00 5.00 457789 TAP 2019 03 21 05 05 00 3913-99 G co CCGG 314.770 -999.990 ... V2 2019 05 08 13 42 00 36.7376 126.1328 21.00 16.00 5.00 457790 TAP 2019 03 21 05 19 00 1595-99 G co CCGG 308.100 -999.990 ... V2 2019 05 08 13 57 00 36.7376 126.1328 21.00 16.00 5.00 457791 TAP 2019 03 21 05 19 00 2014-99 G co CCGG 305.670 -999.990 ... V2 2019 05 08 14 13 00 36.7376 126.1328 21.00 16.00 5.00 457792 TAP 2019 03 29 05 13 00 2453-99 G co CCGG 239.120 -999.990 ... V2 2019 05 06 10 37 00 36.7376 126.1328 21.00 16.00 5.00 457819 TAP 2019 03 29 05 13 00 2454-99 G co CCGG 238.340 -999.990 ... V2 2019 05 06 10 53 00 36.7376 126.1328 21.00 16.00 5.00 457820 TAP 2019 03 29 05 28 00 679-99 G co CCGG 253.760 -999.990 N.. V2 2019 05 06 11 09 00 36.7376 126.1328 21.00 16.00 5.00 457817 TAP 2019 03 29 05 28 00 680-99 G co CCGG 265.380 -999.990 N.. V2 2019 05 06 11 25 00 36.7376 126.1328 21.00 16.00 5.00 457818 TAP 2019 04 03 05 30 00 5155-99 G co CCGG 227.510 -999.990 ... V2 2019 06 07 13 10 00 36.7376 126.1328 21.00 16.00 5.00 459200 TAP 2019 04 03 05 30 00 5156-99 G co CCGG 228.290 -999.990 ... V2 2019 06 07 13 26 00 36.7376 126.1328 21.00 16.00 5.00 459201 TAP 2019 04 03 05 45 00 229-99 G co CCGG 248.080 -999.990 ... V2 2019 06 07 13 42 00 36.7376 126.1328 21.00 16.00 5.00 459196 TAP 2019 04 03 05 45 00 230-99 G co CCGG 247.430 -999.990 ... V2 2019 06 07 13 58 00 36.7376 126.1328 21.00 16.00 5.00 459197 TAP 2019 04 13 04 00 00 1590-99 G co CCGG 306.650 -999.990 ... V2 2019 05 31 14 23 00 36.7376 126.1328 21.00 16.00 5.00 459222 TAP 2019 04 13 04 00 00 539-99 G co CCGG 306.200 -999.990 ... V2 2019 05 31 14 07 00 36.7376 126.1328 21.00 16.00 5.00 459223 TAP 2019 04 13 04 14 00 1308-99 G co CCGG 306.380 -999.990 ... V2 2019 05 31 14 39 00 36.7376 126.1328 21.00 16.00 5.00 459220 TAP 2019 04 13 04 14 00 1445-99 G co CCGG 307.140 -999.990 ... V2 2019 05 31 14 54 00 36.7376 126.1328 21.00 16.00 5.00 459221 TAP 2019 04 15 07 15 00 2490-99 G co CCGG 258.160 -999.990 ... V2 2019 06 07 15 17 00 36.7376 126.1328 21.00 16.00 5.00 459198 TAP 2019 04 15 07 15 00 5355-99 G co CCGG 258.290 -999.990 ... V2 2019 06 07 15 32 00 36.7376 126.1328 21.00 16.00 5.00 459199 TAP 2019 04 15 07 20 00 3585-99 G co CCGG 256.390 -999.990 ... V2 2019 06 07 16 04 00 36.7376 126.1328 21.00 16.00 5.00 459203 TAP 2019 04 15 07 20 00 926-99 G co CCGG 257.350 -999.990 ... V2 2019 06 07 15 48 00 36.7376 126.1328 21.00 16.00 5.00 459202 TAP 2019 04 27 03 25 00 3974-99 G co CCGG 173.530 -999.990 ... V2 2019 06 12 12 01 00 36.7376 126.1328 21.00 16.00 5.00 459489 TAP 2019 04 27 03 25 00 4753-99 G co CCGG 175.080 -999.990 ... V2 2019 06 12 12 17 00 36.7376 126.1328 21.00 16.00 5.00 459490 TAP 2019 04 27 03 40 00 1744-99 G co CCGG 171.850 -999.990 ... V2 2019 06 12 11 45 00 36.7376 126.1328 21.00 16.00 5.00 459491 TAP 2019 04 27 03 40 00 519-99 G co CCGG 169.810 -999.990 ... V2 2019 06 12 11 29 00 36.7376 126.1328 21.00 16.00 5.00 459492 TAP 2019 04 30 04 10 00 2857-99 G co CCGG 312.170 -999.990 ... V2 2019 06 12 14 07 00 36.7376 126.1328 21.00 16.00 5.00 459499 TAP 2019 04 30 04 10 00 3835-99 G co CCGG 313.180 -999.990 ... V2 2019 06 12 14 23 00 36.7376 126.1328 21.00 16.00 5.00 459500 TAP 2019 04 30 04 24 00 4196-99 G co CCGG 327.830 -999.990 ... V2 2019 06 12 13 36 00 36.7376 126.1328 21.00 16.00 5.00 459497 TAP 2019 04 30 04 24 00 4959-99 G co CCGG 326.670 -999.990 ... V2 2019 06 12 13 52 00 36.7376 126.1328 21.00 16.00 5.00 459498 TAP 2019 05 02 02 45 00 1450-99 G co CCGG 186.830 -999.990 ... V2 2019 07 16 14 07 00 36.7376 126.1328 21.00 16.00 5.00 461064 TAP 2019 05 02 02 45 00 5377-99 G co CCGG 185.010 -999.990 ... V2 2019 07 16 14 22 00 36.7376 126.1328 21.00 16.00 5.00 461065 TAP 2019 05 02 02 59 00 1548-99 G co CCGG 189.390 -999.990 ... V2 2019 07 16 13 51 00 36.7376 126.1328 21.00 16.00 5.00 461066 TAP 2019 05 02 02 59 00 647-99 G co CCGG 189.530 -999.990 ... V2 2019 07 16 13 35 00 36.7376 126.1328 21.00 16.00 5.00 461067 TAP 2019 05 07 04 40 00 317-99 G co CCGG 645.160 -999.990 N.. V2 2019 07 03 11 57 00 36.7376 126.1328 21.00 16.00 5.00 460568 TAP 2019 05 07 04 40 00 4491-99 G co CCGG 639.980 -999.990 N.. V2 2019 07 03 12 13 00 36.7376 126.1328 21.00 16.00 5.00 460569 TAP 2019 05 07 04 55 00 5424-99 G co CCGG 602.660 -999.990 .XC V2 2019 07 03 12 44 00 36.7376 126.1328 21.00 16.00 5.00 460571 TAP 2019 05 07 04 55 00 901-99 G co CCGG 606.610 -999.990 .XC V2 2019 07 03 12 28 00 36.7376 126.1328 21.00 16.00 5.00 460570 TAP 2019 05 18 04 00 00 1973-99 G co CCGG 136.980 -999.990 ... V2 2019 07 01 11 21 00 36.7376 126.1328 21.00 16.00 5.00 460534 TAP 2019 05 18 04 00 00 2959-99 G co CCGG 136.340 -999.990 ... V2 2019 07 01 11 36 00 36.7376 126.1328 21.00 16.00 5.00 460535 TAP 2019 05 18 04 15 00 2137-99 G co CCGG 138.430 -999.990 ... V2 2019 07 01 11 52 00 36.7376 126.1328 21.00 16.00 5.00 460536 TAP 2019 05 18 04 15 00 5600-99 G co CCGG 137.530 -999.990 ... V2 2019 07 01 12 08 00 36.7376 126.1328 21.00 16.00 5.00 460537 TAP 2019 05 21 07 05 00 2081-99 G co CCGG 267.320 -999.990 ... V2 2019 07 03 13 33 00 36.7376 126.1328 21.00 16.00 5.00 460574 TAP 2019 05 21 07 05 00 3070-99 G co CCGG 267.540 -999.990 ... V2 2019 07 03 13 48 00 36.7376 126.1328 21.00 16.00 5.00 460575 TAP 2019 05 21 07 20 00 3635-99 G co CCGG 273.660 -999.990 ... V2 2019 07 03 13 17 00 36.7376 126.1328 21.00 16.00 5.00 460573 TAP 2019 05 21 07 20 00 933-99 G co CCGG 273.670 -999.990 ... V2 2019 07 03 13 01 00 36.7376 126.1328 21.00 16.00 5.00 460572 TAP 2019 05 26 04 00 00 1149-99 G co CCGG 216.870 -999.990 ... V2 2019 06 28 16 45 00 36.7376 126.1328 21.00 16.00 5.00 460538 TAP 2019 05 26 04 00 00 1150-99 G co CCGG 214.270 -999.990 ... V2 2019 06 28 17 00 00 36.7376 126.1328 21.00 16.00 5.00 460539 TAP 2019 05 26 04 15 00 4803-99 G co CCGG 213.940 -999.990 N.. V2 2019 07 01 10 49 00 36.7376 126.1328 21.00 16.00 5.00 460532 TAP 2019 05 26 04 15 00 4804-99 G co CCGG 208.480 -999.990 N.. V2 2019 07 01 11 05 00 36.7376 126.1328 21.00 16.00 5.00 460533 TAP 2019 06 02 04 10 00 1095-99 G co CCGG 206.230 -999.990 N.. V2 2019 07 29 11 46 00 36.7376 126.1328 21.00 16.00 5.00 461694 TAP 2019 06 02 04 10 00 2383-99 G co CCGG 197.160 -999.990 N.. V2 2019 07 29 12 02 00 36.7376 126.1328 21.00 16.00 5.00 461695 TAP 2019 06 02 04 25 00 1843-99 G co CCGG 200.350 -999.990 ... V2 2019 07 29 11 15 00 36.7376 126.1328 21.00 16.00 5.00 461692 TAP 2019 06 02 04 25 00 2619-99 G co CCGG 197.960 -999.990 ... V2 2019 07 29 11 30 00 36.7376 126.1328 21.00 16.00 5.00 461693 TAP 2019 06 09 05 05 00 424-99 G co CCGG 224.590 -999.990 ... V2 2019 07 26 11 12 00 36.7376 126.1328 21.00 16.00 5.00 461688 TAP 2019 06 09 05 05 00 5296-99 G co CCGG 222.820 -999.990 ... V2 2019 07 26 11 28 00 36.7376 126.1328 21.00 16.00 5.00 461689 TAP 2019 06 09 05 20 00 2452-99 G co CCGG 212.820 -999.990 ... V2 2019 08 01 09 48 00 36.7376 126.1328 21.00 16.00 5.00 461674 TAP 2019 06 09 05 20 00 3914-99 G co CCGG 212.220 -999.990 ... V2 2019 08 01 10 04 00 36.7376 126.1328 21.00 16.00 5.00 461675 TAP 2019 06 11 06 05 00 3245-99 G co CCGG 198.710 -999.990 ... AR2 2019 09 26 15 23 08 36.7376 126.1328 21.00 16.00 5.00 465208 TAP 2019 06 11 06 05 00 4105-99 G co CCGG 196.060 -999.990 ... AR2 2019 09 26 15 37 29 36.7376 126.1328 21.00 16.00 5.00 465209 TAP 2019 06 11 06 20 00 1757-99 G co CCGG 209.870 -999.990 N.. AR2 2019 09 26 14 54 26 36.7376 126.1328 21.00 16.00 5.00 465206 TAP 2019 06 11 06 20 00 5253-99 G co CCGG 203.350 -999.990 N.. AR2 2019 09 26 15 08 47 36.7376 126.1328 21.00 16.00 5.00 465207 TAP 2019 06 16 04 05 00 105-99 G co CCGG 168.910 -999.990 ... AR2 2019 10 10 12 39 05 36.7376 126.1328 21.00 16.00 5.00 465718 TAP 2019 06 16 04 05 00 5251-99 G co CCGG 165.290 -999.990 ... AR2 2019 10 10 12 53 27 36.7376 126.1328 21.00 16.00 5.00 465719 TAP 2019 06 16 04 20 00 415-99 G co CCGG 168.420 -999.990 ... AR2 2019 10 10 13 36 38 36.7376 126.1328 21.00 16.00 5.00 465720 TAP 2019 06 16 04 20 00 791-99 G co CCGG 165.670 -999.990 ... AR2 2019 10 10 13 50 58 36.7376 126.1328 21.00 16.00 5.00 465721 TAP 2019 06 22 05 25 00 1779-99 G co CCGG 196.400 -999.990 N.. AR2 2019 08 07 14 01 30 36.7376 126.1328 21.00 16.00 5.00 462406 TAP 2019 06 22 05 25 00 3853-99 G co CCGG 222.740 -999.990 N.. AR2 2019 08 07 14 15 53 36.7376 126.1328 21.00 16.00 5.00 462407 TAP 2019 06 22 05 40 00 638-99 G co CCGG 225.370 -999.990 ... AR2 2019 08 07 13 32 53 36.7376 126.1328 21.00 16.00 5.00 462408 TAP 2019 06 22 05 40 00 821-99 G co CCGG 223.640 -999.990 ... AR2 2019 08 07 13 47 14 36.7376 126.1328 21.00 16.00 5.00 462409 TAP 2019 07 02 05 14 00 1089-99 G co CCGG 235.990 -999.990 ... AR2 2019 09 05 17 44 45 36.7376 126.1328 21.00 16.00 5.00 464024 TAP 2019 07 02 05 14 00 2196-99 G co CCGG 237.350 -999.990 ... AR2 2019 09 05 17 59 03 36.7376 126.1328 21.00 16.00 5.00 464025 TAP 2019 07 02 05 29 00 303-99 G co CCGG 304.460 -999.990 N.. AR2 2019 09 05 17 16 08 36.7376 126.1328 21.00 16.00 5.00 464026 TAP 2019 07 02 05 29 00 5400-99 G co CCGG 432.170 -999.990 N.. AR2 2019 09 05 17 30 26 36.7376 126.1328 21.00 16.00 5.00 464027 TAP 2019 07 07 03 50 00 1512-99 G co CCGG 208.020 -999.990 ... AR2 2019 09 06 10 15 37 36.7376 126.1328 21.00 16.00 5.00 464030 TAP 2019 07 07 03 50 00 4307-99 G co CCGG 208.960 -999.990 ... AR2 2019 09 06 10 29 54 36.7376 126.1328 21.00 16.00 5.00 464031 TAP 2019 07 07 04 15 00 1662-99 G co CCGG 212.240 -999.990 ... AR2 2019 09 06 09 47 03 36.7376 126.1328 21.00 16.00 5.00 464028 TAP 2019 07 07 04 15 00 5568-99 G co CCGG 209.480 -999.990 ... AR2 2019 09 06 10 01 20 36.7376 126.1328 21.00 16.00 5.00 464029 TAP 2019 07 14 04 14 00 429-99 G co CCGG 213.600 -999.990 ... AR2 2019 09 11 15 26 42 36.7376 126.1328 21.00 16.00 5.00 464355 TAP 2019 07 14 04 14 00 872-99 G co CCGG 215.480 -999.990 ... AR2 2019 09 11 15 12 24 36.7376 126.1328 21.00 16.00 5.00 464356 TAP 2019 07 14 04 29 00 1737-99 G co CCGG 232.630 -999.990 ... AR2 2019 09 11 13 46 39 36.7376 126.1328 21.00 16.00 5.00 464357 TAP 2019 07 14 04 29 00 2195-99 G co CCGG 233.200 -999.990 ... AR2 2019 09 11 14 00 58 36.7376 126.1328 21.00 16.00 5.00 464358 TAP 2019 07 24 06 11 00 3113-99 G co CCGG 103.900 -999.990 ... AR2 2019 09 16 16 12 09 36.7376 126.1328 21.00 16.00 5.00 464348 TAP 2019 07 24 06 11 00 3345-99 G co CCGG 106.090 -999.990 ... AR2 2019 09 16 16 26 19 36.7376 126.1328 21.00 16.00 5.00 464347 TAP 2019 07 24 06 26 00 1878-99 G co CCGG 101.920 -999.990 ... AR2 2019 09 16 16 40 32 36.7376 126.1328 21.00 16.00 5.00 464349 TAP 2019 07 24 06 26 00 5053-99 G co CCGG 100.420 -999.990 ... AR2 2019 09 16 16 54 51 36.7376 126.1328 21.00 16.00 5.00 464350 TAP 2019 07 29 07 00 00 1670-99 G co CCGG 77.090 -999.990 N.. AR2 2019 09 17 12 30 03 36.7376 126.1328 21.00 16.00 5.00 464343 TAP 2019 07 29 07 00 00 3582-99 G co CCGG 73.690 -999.990 ... AR2 2019 09 17 12 44 22 36.7376 126.1328 21.00 16.00 5.00 464344 TAP 2019 07 29 07 12 00 3799-99 G co CCGG 73.010 -999.990 ... AR2 2019 09 17 12 15 47 36.7376 126.1328 21.00 16.00 5.00 464345 TAP 2019 07 29 07 12 00 713-99 G co CCGG 73.570 -999.990 ... AR2 2019 09 17 12 01 32 36.7376 126.1328 21.00 16.00 5.00 464346 TAP 2019 08 03 06 08 00 2141-99 G co CCGG 243.130 -999.990 ... AR2 2019 10 17 10 57 48 36.7376 126.1328 21.00 16.00 5.00 465762 TAP 2019 08 03 06 08 00 964-99 G co CCGG 243.270 -999.990 ... AR2 2019 10 17 10 43 27 36.7376 126.1328 21.00 16.00 5.00 465763 TAP 2019 08 03 06 21 00 2633-99 G co CCGG 191.820 -999.990 ... AR2 2019 10 11 14 40 26 36.7376 126.1328 21.00 16.00 5.00 465786 TAP 2019 08 03 06 21 00 4540-99 G co CCGG 195.430 -999.990 ... AR2 2019 10 11 14 54 48 36.7376 126.1328 21.00 16.00 5.00 465785 TAP 2019 08 19 05 12 00 2675-99 G co CCGG 276.900 -999.990 N.. AR2 2019 10 09 14 48 15 36.7376 126.1328 21.00 16.00 5.00 465694 TAP 2019 08 19 05 12 00 5576-99 G co CCGG 272.620 -999.990 N.. AR2 2019 10 09 15 02 39 36.7376 126.1328 21.00 16.00 5.00 465695 TAP 2019 08 19 05 34 00 2074-99 G co CCGG 273.630 -999.990 N.. AR2 2019 10 09 14 33 51 36.7376 126.1328 21.00 16.00 5.00 465697 TAP 2019 08 19 05 34 00 830-99 G co CCGG 284.360 -999.990 N.. AR2 2019 10 09 14 19 28 36.7376 126.1328 21.00 16.00 5.00 465696 TAP 2019 08 23 05 38 00 3356-99 G co CCGG 513.670 -999.990 .XC AR2 2019 10 10 12 10 16 36.7376 126.1328 21.00 16.00 5.00 465716 TAP 2019 08 23 05 38 00 5640-99 G co CCGG 516.160 -999.990 .XC AR2 2019 10 10 12 24 42 36.7376 126.1328 21.00 16.00 5.00 465717 TAP 2019 08 23 05 51 00 2056-99 G co CCGG 473.660 -999.990 .X. AR2 2019 10 10 13 22 15 36.7376 126.1328 21.00 16.00 5.00 465715 TAP 2019 08 23 05 51 00 782-99 G co CCGG 472.520 -999.990 .X. AR2 2019 10 10 13 07 49 36.7376 126.1328 21.00 16.00 5.00 465714 TAP 2019 08 27 08 00 00 3025-99 G co CCGG 307.830 -999.990 ... AR2 2019 10 16 11 51 17 36.7376 126.1328 21.00 16.00 5.00 465745 TAP 2019 08 27 08 00 00 863-99 G co CCGG 306.780 -999.990 ... AR2 2019 10 16 11 36 55 36.7376 126.1328 21.00 16.00 5.00 465744 TAP 2019 08 27 08 12 00 1343-99 G co CCGG 301.570 -999.990 ... AR2 2019 10 16 12 05 40 36.7376 126.1328 21.00 16.00 5.00 465742 TAP 2019 08 27 08 12 00 2568-99 G co CCGG 301.620 -999.990 ... AR2 2019 10 16 12 20 03 36.7376 126.1328 21.00 16.00 5.00 465743 TAP 2019 09 08 06 03 00 1960-99 G co CCGG 196.270 -999.990 N.. AR2 2019 11 04 14 25 41 36.7376 126.1328 21.00 16.00 5.00 466526 TAP 2019 09 08 06 03 00 400-99 G co CCGG 191.100 -999.990 A.. AR2 2019 11 04 14 11 22 36.7376 126.1328 21.00 16.00 5.00 466525 TAP 2019 09 08 06 15 00 4050-99 G co CCGG 215.860 -999.990 N.. AR2 2019 11 04 11 17 42 36.7376 126.1328 21.00 16.00 5.00 466527 TAP 2019 09 08 06 15 00 4479-99 G co CCGG 191.020 -999.990 N.. AR2 2019 11 04 11 32 04 36.7376 126.1328 21.00 16.00 5.00 466528 TAP 2019 09 24 03 00 00 5123-99 G co CCGG 178.210 -999.990 ... AR2 2019 11 04 15 08 44 36.7376 126.1328 21.00 16.00 5.00 466531 TAP 2019 09 24 03 00 00 5124-99 G co CCGG 178.430 -999.990 ... AR2 2019 11 04 15 23 05 36.7376 126.1328 21.00 16.00 5.00 466532 TAP 2019 09 24 03 20 00 1955-99 G co CCGG 180.420 -999.990 ... AR2 2019 11 04 14 40 02 36.7376 126.1328 21.00 16.00 5.00 466529 TAP 2019 09 24 03 20 00 2996-99 G co CCGG 181.560 -999.990 ... AR2 2019 11 04 14 54 23 36.7376 126.1328 21.00 16.00 5.00 466530 TAP 2019 10 06 06 05 00 361-99 G co CCGG 168.150 -999.990 ... AR2 2019 12 11 17 29 17 36.7376 126.1328 21.00 16.00 5.00 468010 TAP 2019 10 06 06 05 00 4781-99 G co CCGG 167.290 -999.990 ... AR2 2019 12 11 17 43 37 36.7376 126.1328 21.00 16.00 5.00 468011 TAP 2019 10 06 06 19 00 1771-99 G co CCGG 171.380 -999.990 ... AR2 2019 12 11 17 00 42 36.7376 126.1328 21.00 16.00 5.00 468012 TAP 2019 10 06 06 19 00 4782-99 G co CCGG 172.190 -999.990 ... AR2 2019 12 11 17 14 59 36.7376 126.1328 21.00 16.00 5.00 468013 TAP 2019 10 12 05 31 00 2100-99 G co CCGG 185.020 -999.990 N.. AR2 2019 12 06 14 25 44 36.7376 126.1328 21.00 16.00 5.00 467856 TAP 2019 10 12 05 31 00 2150-99 G co CCGG 188.890 -999.990 N.. AR2 2019 12 06 14 40 04 36.7376 126.1328 21.00 16.00 5.00 467857 TAP 2019 10 12 05 45 00 2565-99 G co CCGG 177.790 -999.990 ... AR2 2019 12 06 14 54 24 36.7376 126.1328 21.00 16.00 5.00 467854 TAP 2019 10 12 05 45 00 3526-99 G co CCGG 176.160 -999.990 ... AR2 2019 12 06 15 08 46 36.7376 126.1328 21.00 16.00 5.00 467855 TAP 2019 10 18 03 46 00 3670-99 G co CCGG 137.610 -999.990 ... AR2 2019 12 12 10 40 16 36.7376 126.1328 21.00 16.00 5.00 468014 TAP 2019 10 18 03 46 00 5450-99 G co CCGG 136.720 -999.990 ... AR2 2019 12 12 10 54 32 36.7376 126.1328 21.00 16.00 5.00 468015 TAP 2019 10 18 04 00 00 4080-99 G co CCGG 140.780 -999.990 ... AR2 2019 12 12 10 11 41 36.7376 126.1328 21.00 16.00 5.00 468016 TAP 2019 10 18 04 00 00 4190-99 G co CCGG 143.180 -999.990 ... AR2 2019 12 12 10 25 58 36.7376 126.1328 21.00 16.00 5.00 468017 TAP 2019 10 26 04 43 00 1294-99 G co CCGG 158.230 -999.990 ... AR2 2019 12 10 12 49 13 36.7376 126.1328 21.00 16.00 5.00 468061 TAP 2019 10 26 04 43 00 3046-99 G co CCGG 157.960 -999.990 ... AR2 2019 12 10 13 03 39 36.7376 126.1328 21.00 16.00 5.00 468062 TAP 2019 10 26 04 59 00 354-99 G co CCGG 158.040 -999.990 ... AR2 2019 12 10 12 20 30 36.7376 126.1328 21.00 16.00 5.00 468063 TAP 2019 10 26 04 59 00 4719-99 G co CCGG 157.770 -999.990 ... AR2 2019 12 10 12 34 53 36.7376 126.1328 21.00 16.00 5.00 468064 TAP 2019 11 04 05 16 00 1053-99 G co CCGG 197.880 -999.990 ... AR2 2020 01 21 14 23 11 36.7376 126.1328 21.00 16.00 5.00 468699 TAP 2019 11 04 05 16 00 3687-99 G co CCGG 195.960 -999.990 ... AR2 2020 01 21 14 37 31 36.7376 126.1328 21.00 16.00 5.00 468700 TAP 2019 11 04 05 20 00 1440-99 G co CCGG 213.170 -999.990 ... AR2 2020 01 21 13 54 31 36.7376 126.1328 21.00 16.00 5.00 468697 TAP 2019 11 04 05 20 00 4024-99 G co CCGG 210.350 -999.990 ... AR2 2020 01 21 14 08 51 36.7376 126.1328 21.00 16.00 5.00 468698 TAP 2019 11 08 06 50 00 2794-99 G co CCGG 145.920 -999.990 ... AR2 2020 01 21 15 20 39 36.7376 126.1328 21.00 16.00 5.00 468762 TAP 2019 11 08 06 50 00 4658-99 G co CCGG 145.790 -999.990 ... AR2 2020 01 21 15 35 01 36.7376 126.1328 21.00 16.00 5.00 468763 TAP 2019 11 08 07 05 00 180-99 G co CCGG 147.620 -999.990 ... AR2 2020 01 21 14 51 51 36.7376 126.1328 21.00 16.00 5.00 468764 TAP 2019 11 08 07 05 00 3935-99 G co CCGG 147.700 -999.990 ... AR2 2020 01 21 15 06 13 36.7376 126.1328 21.00 16.00 5.00 468765 TAP 2019 11 14 05 14 00 1550-99 G co CCGG 139.230 -999.990 ... AR2 2020 01 16 14 00 15 36.7376 126.1328 21.00 16.00 5.00 468695 TAP 2019 11 14 05 14 00 5127-99 G co CCGG 138.270 -999.990 ... AR2 2020 01 16 14 14 33 36.7376 126.1328 21.00 16.00 5.00 468696 TAP 2019 11 14 05 29 00 2633-99 G co CCGG 138.720 -999.990 ... AR2 2020 01 21 13 25 49 36.7376 126.1328 21.00 16.00 5.00 468693 TAP 2019 11 14 05 29 00 4540-99 G co CCGG 138.890 -999.990 ... AR2 2020 01 21 13 40 10 36.7376 126.1328 21.00 16.00 5.00 468694 TAP 2019 11 25 08 00 00 4414-99 G co CCGG 282.760 -999.990 ... AR2 2020 01 23 16 50 02 36.7376 126.1328 21.00 16.00 5.00 468952 TAP 2019 11 25 08 00 00 5161-99 G co CCGG 285.240 -999.990 ... AR2 2020 01 23 17 04 27 36.7376 126.1328 21.00 16.00 5.00 468953 TAP 2019 11 25 08 14 00 3408-99 G co CCGG 280.550 -999.990 ... AR2 2020 01 23 16 35 40 36.7376 126.1328 21.00 16.00 5.00 468951 TAP 2019 11 25 08 14 00 99-99 G co CCGG 281.620 -999.990 ... AR2 2020 01 23 16 21 17 36.7376 126.1328 21.00 16.00 5.00 468950 TAP 2019 11 29 08 00 00 4740-99 G co CCGG 145.480 -999.990 ... AR2 2020 01 28 11 55 27 36.7376 126.1328 21.00 16.00 5.00 469168 TAP 2019 11 29 08 00 00 4972-99 G co CCGG 146.260 -999.990 ... AR2 2020 01 28 12 09 51 36.7376 126.1328 21.00 16.00 5.00 469169 TAP 2019 11 29 08 15 00 4370-99 G co CCGG 152.330 -999.990 ... AR2 2020 01 28 11 26 39 36.7376 126.1328 21.00 16.00 5.00 469166 TAP 2019 11 29 08 15 00 4826-99 G co CCGG 151.950 -999.990 ... AR2 2020 01 28 11 41 05 36.7376 126.1328 21.00 16.00 5.00 469167 TAP 2019 12 05 04 45 00 1916-99 G co CCGG 197.560 -999.990 ... AR2 2020 02 10 10 37 23 36.7376 126.1328 21.00 16.00 5.00 469958 TAP 2019 12 05 04 45 00 2904-99 G co CCGG 197.950 -999.990 ... AR2 2020 02 10 10 51 47 36.7376 126.1328 21.00 16.00 5.00 469959 TAP 2019 12 05 05 00 00 26-99 G co CCGG 196.990 -999.990 ... AR2 2020 02 10 11 06 10 36.7376 126.1328 21.00 16.00 5.00 469960 TAP 2019 12 05 05 00 00 2973-99 G co CCGG 198.150 -999.990 ... AR2 2020 02 10 11 20 31 36.7376 126.1328 21.00 16.00 5.00 469961 TAP 2019 12 19 02 55 00 2429-99 G co CCGG 179.970 -999.990 ... AR2 2020 02 11 14 17 07 36.7376 126.1328 21.00 16.00 5.00 470371 TAP 2019 12 19 02 55 00 445-99 G co CCGG 180.000 -999.990 ... AR2 2020 02 11 14 31 28 36.7376 126.1328 21.00 16.00 5.00 470372 TAP 2019 12 19 03 10 00 181-99 G co CCGG 181.580 -999.990 ... AR2 2020 02 11 13 48 22 36.7376 126.1328 21.00 16.00 5.00 470373 TAP 2019 12 19 03 10 00 2149-99 G co CCGG 180.910 -999.990 ... AR2 2020 02 11 14 02 45 36.7376 126.1328 21.00 16.00 5.00 470374 TAP 2019 12 31 04 25 00 2679-99 G co CCGG 172.520 -999.990 ... AR2 2020 02 11 15 00 11 36.7376 126.1328 21.00 16.00 5.00 470377 TAP 2019 12 31 04 25 00 3885-99 G co CCGG 172.540 -999.990 ... AR2 2020 02 11 14 45 49 36.7376 126.1328 21.00 16.00 5.00 470378 TAP 2019 12 31 04 40 00 1025-99 G co CCGG 174.690 -999.990 ... AR2 2020 02 11 15 43 11 36.7376 126.1328 21.00 16.00 5.00 470375 TAP 2019 12 31 04 40 00 4556-99 G co CCGG 174.560 -999.990 ... AR2 2020 02 11 15 57 32 36.7376 126.1328 21.00 16.00 5.00 470376