# number_of_header_lines: 68 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Environment Canada [EC] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: mbc # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-08-31 16:45:01 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number MBC 1990 11 09 18 30 00 432-81 P co CCGG 143.300 -999.990 W.. R4 1991 01 09 09 21 00 76.2470 -119.3533 33.00 30.00 3.00 74193 MBC 1990 11 09 18 30 00 432-81 P co CCGG 154.910 -999.990 W.. R4 1991 01 09 09 37 00 76.2470 -119.3533 33.00 30.00 3.00 74193 MBC 1990 11 15 22 33 00 40-81 P co CCGG 152.980 -999.990 W.. R4 1991 01 09 09 54 00 76.2470 -119.3533 33.00 30.00 3.00 74195 MBC 1990 11 15 22 33 00 40-81 P co CCGG 155.590 -999.990 W.. R4 1991 01 09 10 11 00 76.2470 -119.3533 33.00 30.00 3.00 74195 MBC 1990 11 17 15 00 00 297-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 09 17 01 00 76.2470 -119.3533 33.00 30.00 3.00 74196 MBC 1990 11 17 15 00 00 297-81 P co CCGG 171.340 -999.990 W.. R4 1991 01 09 17 18 00 76.2470 -119.3533 33.00 30.00 3.00 74196 MBC 1990 11 17 15 00 00 298-81 P co CCGG 168.500 -999.990 W.. R4 1991 01 09 11 20 00 76.2470 -119.3533 33.00 30.00 3.00 74197 MBC 1990 11 20 23 00 00 978-81 P co CCGG 175.910 -999.990 W.. R4 1991 01 09 11 37 00 76.2470 -119.3533 33.00 30.00 3.00 74199 MBC 1990 11 20 23 00 00 978-81 P co CCGG 176.460 -999.990 W.. R4 1991 01 09 11 55 00 76.2470 -119.3533 33.00 30.00 3.00 74199 MBC 1990 11 23 17 00 00 1316-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 09 12 44 00 76.2470 -119.3533 33.00 30.00 3.00 74201 MBC 1990 11 23 17 00 00 1316-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 09 13 02 00 76.2470 -119.3533 33.00 30.00 3.00 74201 MBC 1990 11 26 15 20 00 402-81 P co CCGG 164.720 -999.990 W.. R4 1991 01 09 12 11 00 76.2470 -119.3533 33.00 30.00 3.00 74203 MBC 1990 11 26 15 20 00 402-81 P co CCGG 160.560 -999.990 W.. R4 1991 01 09 12 28 00 76.2470 -119.3533 33.00 30.00 3.00 74203 MBC 1990 11 30 22 00 00 492-81 P co CCGG 161.330 -999.990 W.. R4 1991 01 09 10 27 00 76.2470 -119.3533 33.00 30.00 3.00 74205 MBC 1990 11 30 22 00 00 492-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 09 10 44 00 76.2470 -119.3533 33.00 30.00 3.00 74205 MBC 1990 12 05 02 08 00 1111-81 P co CCGG 177.820 -999.990 W.. R4 1991 01 09 18 08 00 76.2470 -119.3533 33.00 30.00 3.00 74206 MBC 1990 12 05 02 08 00 1111-81 P co CCGG 181.050 -999.990 W.. R4 1991 01 09 18 26 00 76.2470 -119.3533 33.00 30.00 3.00 74206 MBC 1990 12 05 02 08 00 1112-81 P co CCGG 166.020 -999.990 W.. R4 1991 01 09 11 01 00 76.2470 -119.3533 33.00 30.00 3.00 74207 MBC 1990 12 07 18 00 00 447-81 P co CCGG 185.740 -999.990 W.. R4 1991 02 06 15 33 00 76.2470 -119.3533 33.00 30.00 3.00 74208 MBC 1990 12 07 18 00 00 447-81 P co CCGG 182.960 -999.990 W.. R4 1991 02 06 15 50 00 76.2470 -119.3533 33.00 30.00 3.00 74208 MBC 1990 12 11 23 18 00 90-81 P co CCGG 183.240 -999.990 W.. R4 1991 02 06 11 24 00 76.2470 -119.3533 33.00 30.00 3.00 74211 MBC 1990 12 11 23 18 00 90-81 P co CCGG 180.930 -999.990 W.. R4 1991 02 06 11 40 00 76.2470 -119.3533 33.00 30.00 3.00 74211 MBC 1990 12 14 18 40 00 313-81 P co CCGG 179.280 -999.990 W.. R4 1991 02 06 16 06 00 76.2470 -119.3533 33.00 30.00 3.00 74212 MBC 1990 12 14 18 40 00 313-81 P co CCGG 179.400 -999.990 W.. R4 1991 02 06 16 25 00 76.2470 -119.3533 33.00 30.00 3.00 74212 MBC 1990 12 14 18 40 00 314-81 P co CCGG 200.500 -999.990 W.. R4 1991 02 06 10 46 00 76.2470 -119.3533 33.00 30.00 3.00 74213 MBC 1990 12 17 14 35 00 542-81 P co CCGG 239.260 -999.990 W.C R4 1991 02 06 10 12 00 76.2470 -119.3533 33.00 30.00 3.00 74215 MBC 1990 12 17 14 35 00 542-81 P co CCGG 241.170 -999.990 W.C R4 1991 02 06 10 29 00 76.2470 -119.3533 33.00 30.00 3.00 74215 MBC 1990 12 21 10 15 00 549-81 P co CCGG 195.550 -999.990 W.. R4 1991 02 06 18 13 00 76.2470 -119.3533 33.00 30.00 3.00 74216 MBC 1990 12 21 10 15 00 549-81 P co CCGG 195.040 -999.990 W.. R4 1991 02 06 18 31 00 76.2470 -119.3533 33.00 30.00 3.00 74216 MBC 1990 12 21 10 15 00 550-81 P co CCGG 239.910 -999.990 W.C R4 1991 02 06 11 06 00 76.2470 -119.3533 33.00 30.00 3.00 74217 MBC 1990 12 24 16 15 00 647-81 P co CCGG 258.900 -999.990 W.C R4 1991 02 06 18 47 00 76.2470 -119.3533 33.00 30.00 3.00 74218 MBC 1990 12 24 16 15 00 647-81 P co CCGG 257.940 -999.990 W.C R4 1991 02 06 19 04 00 76.2470 -119.3533 33.00 30.00 3.00 74218 MBC 1990 12 24 16 15 00 648-81 P co CCGG 197.430 -999.990 W.. R4 1991 02 06 11 57 00 76.2470 -119.3533 33.00 30.00 3.00 74219 MBC 1990 12 24 16 15 00 648-81 P co CCGG 201.530 -999.990 W.. R4 1991 02 06 12 14 00 76.2470 -119.3533 33.00 30.00 3.00 74219 MBC 1990 12 26 17 25 00 416-81 P co CCGG 234.230 -999.990 W.C R4 1991 02 06 12 57 00 76.2470 -119.3533 33.00 30.00 3.00 74221 MBC 1990 12 26 17 25 00 416-81 P co CCGG 233.940 -999.990 W.C R4 1991 02 06 13 13 00 76.2470 -119.3533 33.00 30.00 3.00 74221 MBC 1990 12 30 02 15 00 46-81 P co CCGG 270.930 -999.990 W.C R4 1991 02 06 09 40 00 76.2470 -119.3533 33.00 30.00 3.00 74223 MBC 1990 12 30 02 15 00 46-81 P co CCGG 271.770 -999.990 W.C R4 1991 02 06 09 56 00 76.2470 -119.3533 33.00 30.00 3.00 74223 MBC 1991 01 04 07 20 00 388-81 P co CCGG 223.260 -999.990 W.. R4 1991 02 26 11 06 00 76.2470 -119.3533 33.00 30.00 3.00 74225 MBC 1991 01 04 07 20 00 388-81 P co CCGG 224.110 -999.990 W.. R4 1991 02 26 11 24 00 76.2470 -119.3533 33.00 30.00 3.00 74225 MBC 1991 01 06 14 25 00 48-81 P co CCGG 315.710 -999.990 W.C R4 1991 02 26 09 17 00 76.2470 -119.3533 33.00 30.00 3.00 74227 MBC 1991 01 06 14 25 00 48-81 P co CCGG 317.690 -999.990 W.C R4 1991 02 26 09 34 00 76.2470 -119.3533 33.00 30.00 3.00 74227 MBC 1991 01 11 08 16 00 382-81 P co CCGG 242.580 -999.990 W.C R4 1991 02 26 09 50 00 76.2470 -119.3533 33.00 30.00 3.00 74229 MBC 1991 01 11 08 16 00 382-81 P co CCGG 244.420 -999.990 W.C R4 1991 02 26 10 06 00 76.2470 -119.3533 33.00 30.00 3.00 74229 MBC 1991 01 16 12 15 00 28-81 P co CCGG 249.690 -999.990 W.C R4 1991 02 26 10 24 00 76.2470 -119.3533 33.00 30.00 3.00 74231 MBC 1991 01 16 12 15 00 28-81 P co CCGG 255.540 -999.990 W.C R4 1991 02 26 10 41 00 76.2470 -119.3533 33.00 30.00 3.00 74231 MBC 1991 01 18 16 00 00 700-81 P co CCGG 227.080 -999.990 W.. R4 1991 02 26 14 48 00 76.2470 -119.3533 33.00 30.00 3.00 74233 MBC 1991 01 18 16 00 00 700-81 P co CCGG -999.990 -999.990 *.. R4 1991 02 26 15 06 00 76.2470 -119.3533 33.00 30.00 3.00 74233 MBC 1991 01 21 08 18 00 8-81 P co CCGG 233.520 -999.990 W.C R4 1991 02 26 11 41 00 76.2470 -119.3533 33.00 30.00 3.00 74235 MBC 1991 01 21 08 18 00 8-81 P co CCGG 234.310 -999.990 W.C R4 1991 02 26 11 59 00 76.2470 -119.3533 33.00 30.00 3.00 74235 MBC 1991 01 25 11 13 00 1264-81 P co CCGG -999.990 -999.990 *.. R4 1991 02 26 13 40 00 76.2470 -119.3533 33.00 30.00 3.00 74237 MBC 1991 01 25 11 13 00 1264-81 P co CCGG 224.240 -999.990 W.. R4 1991 02 26 13 58 00 76.2470 -119.3533 33.00 30.00 3.00 74237 MBC 1991 01 28 10 18 00 1258-81 P co CCGG 210.660 -999.990 W.. R4 1991 02 26 14 15 00 76.2470 -119.3533 33.00 30.00 3.00 74239 MBC 1991 01 28 10 18 00 1258-81 P co CCGG -999.990 -999.990 *.. R4 1991 02 26 14 31 00 76.2470 -119.3533 33.00 30.00 3.00 74239 MBC 1991 02 01 01 30 00 1456-81 P co CCGG 216.430 -999.990 W.. R4 1991 03 26 11 00 00 76.2470 -119.3533 33.00 30.00 3.00 74241 MBC 1991 02 01 01 30 00 1456-81 P co CCGG -999.990 -999.990 *.. R4 1991 03 26 11 18 00 76.2470 -119.3533 33.00 30.00 3.00 74241 MBC 1991 02 03 17 25 00 1246-81 P co CCGG 224.640 -999.990 W.. R4 1991 03 26 11 36 00 76.2470 -119.3533 33.00 30.00 3.00 74243 MBC 1991 02 03 17 25 00 1246-81 P co CCGG 222.440 -999.990 W.. R4 1991 03 26 11 52 00 76.2470 -119.3533 33.00 30.00 3.00 74243 MBC 1991 02 08 14 15 00 108-81 P co CCGG 271.260 -999.990 W.C R4 1991 03 26 10 07 00 76.2470 -119.3533 33.00 30.00 3.00 74245 MBC 1991 02 08 14 15 00 108-81 P co CCGG 272.520 -999.990 W.C R4 1991 03 26 10 25 00 76.2470 -119.3533 33.00 30.00 3.00 74245 MBC 1991 02 11 08 37 00 762-81 P co CCGG 329.800 -999.990 W.C R4 1991 03 26 12 16 00 76.2470 -119.3533 33.00 30.00 3.00 74247 MBC 1991 02 11 08 37 00 762-81 P co CCGG 337.780 -999.990 W.C R4 1991 03 26 12 35 00 76.2470 -119.3533 33.00 30.00 3.00 74247 MBC 1991 02 14 15 10 00 964-81 P co CCGG -999.990 -999.990 *.. R4 1991 03 26 10 43 00 76.2470 -119.3533 33.00 30.00 3.00 74249 MBC 1991 02 17 22 30 00 967-81 P co CCGG 255.660 -999.990 W.C R4 1991 03 26 12 51 00 76.2470 -119.3533 33.00 30.00 3.00 74250 MBC 1991 02 17 22 30 00 967-81 P co CCGG 251.810 -999.990 W.C R4 1991 03 26 13 10 00 76.2470 -119.3533 33.00 30.00 3.00 74250 MBC 1991 02 21 11 13 00 576-81 P co CCGG 243.210 -999.990 W.C R4 1991 04 01 15 38 00 76.2470 -119.3533 33.00 30.00 3.00 74253 MBC 1991 02 21 11 13 00 576-81 P co CCGG 244.410 -999.990 W.C R4 1991 04 01 15 54 00 76.2470 -119.3533 33.00 30.00 3.00 74253 MBC 1991 02 28 15 45 00 773-81 P co CCGG 239.670 -999.990 W.C R4 1991 04 02 13 21 00 76.2470 -119.3533 33.00 30.00 3.00 74256 MBC 1991 02 28 15 45 00 773-81 P co CCGG 235.860 -999.990 W.C R4 1991 04 02 13 38 00 76.2470 -119.3533 33.00 30.00 3.00 74256 MBC 1991 02 28 15 45 00 774-81 P co CCGG 218.370 -999.990 W.. R4 1991 04 02 09 24 00 76.2470 -119.3533 33.00 30.00 3.00 74257 MBC 1991 03 01 15 28 00 1184-81 P co CCGG -999.990 -999.990 *.. R4 1991 05 29 15 02 00 76.2470 -119.3533 33.00 30.00 3.00 74259 MBC 1991 03 01 15 28 00 1184-81 P co CCGG -999.990 -999.990 *.. R4 1991 05 29 15 19 00 76.2470 -119.3533 33.00 30.00 3.00 74259 MBC 1991 03 07 16 45 00 209-81 P co CCGG 209.810 -999.990 W.. R4 1991 04 02 12 11 00 76.2470 -119.3533 33.00 30.00 3.00 74262 MBC 1991 03 07 16 45 00 209-81 P co CCGG 204.950 -999.990 W.. R4 1991 04 02 12 29 00 76.2470 -119.3533 33.00 30.00 3.00 74262 MBC 1991 03 10 17 05 00 171-81 P co CCGG 228.730 -999.990 W.. R4 1991 04 02 12 46 00 76.2470 -119.3533 33.00 30.00 3.00 74264 MBC 1991 03 10 17 05 00 171-81 P co CCGG 234.350 -999.990 W.C R4 1991 04 02 13 05 00 76.2470 -119.3533 33.00 30.00 3.00 74264 MBC 1991 03 14 15 05 00 1248-81 P co CCGG 237.500 -999.990 W.C R4 1991 05 29 12 08 00 76.2470 -119.3533 33.00 30.00 3.00 74267 MBC 1991 03 17 16 15 00 219-81 P co CCGG 223.000 -999.990 W.. R4 1991 05 29 13 05 00 76.2470 -119.3533 33.00 30.00 3.00 74268 MBC 1991 03 17 16 15 00 219-81 P co CCGG 222.880 -999.990 W.. R4 1991 05 29 13 21 00 76.2470 -119.3533 33.00 30.00 3.00 74268 MBC 1991 03 21 14 50 00 913-81 P co CCGG 227.330 -999.990 W.. R4 1991 05 29 12 31 00 76.2470 -119.3533 33.00 30.00 3.00 74270 MBC 1991 03 21 14 50 00 913-81 P co CCGG -999.990 -999.990 *.. R4 1991 05 29 12 49 00 76.2470 -119.3533 33.00 30.00 3.00 74270 MBC 1991 03 21 14 50 00 914-81 P co CCGG 313.680 -999.990 W.C R4 1991 05 29 10 41 00 76.2470 -119.3533 33.00 30.00 3.00 74271 MBC 1991 03 25 15 00 00 170-81 P co CCGG -999.990 -999.990 *.. R4 1991 05 29 11 32 00 76.2470 -119.3533 33.00 30.00 3.00 74273 MBC 1991 03 25 15 00 00 170-81 P co CCGG 239.820 -999.990 W.C R4 1991 05 29 11 50 00 76.2470 -119.3533 33.00 30.00 3.00 74273 MBC 1991 04 07 00 25 00 212-81 P co CCGG 331.020 -999.990 W.C R4 1991 05 29 14 10 00 76.2470 -119.3533 33.00 30.00 3.00 74275 MBC 1991 04 07 00 25 00 212-81 P co CCGG 333.370 -999.990 W.C R4 1991 05 29 14 28 00 76.2470 -119.3533 33.00 30.00 3.00 74275 MBC 1991 04 15 16 27 00 157-81 P co CCGG 443.640 -999.990 W.C R4 1991 05 29 16 20 00 76.2470 -119.3533 33.00 30.00 3.00 74276 MBC 1991 04 15 16 27 00 157-81 P co CCGG 444.160 -999.990 W.C R4 1991 05 29 16 37 00 76.2470 -119.3533 33.00 30.00 3.00 74276 MBC 1991 04 15 16 27 00 158-81 P co CCGG 464.650 -999.990 W.C R4 1991 05 29 14 46 00 76.2470 -119.3533 33.00 30.00 3.00 74277 MBC 1991 04 18 22 38 00 132-81 P co CCGG 263.840 -999.990 W.C R4 1991 05 29 10 59 00 76.2470 -119.3533 33.00 30.00 3.00 74279 MBC 1991 04 18 22 38 00 132-81 P co CCGG 262.400 -999.990 W.C R4 1991 05 29 11 15 00 76.2470 -119.3533 33.00 30.00 3.00 74279 MBC 1991 04 25 22 25 00 1440-81 P co CCGG 215.110 -999.990 W.. R4 1991 05 29 13 37 00 76.2470 -119.3533 33.00 30.00 3.00 74281 MBC 1991 04 25 22 25 00 1440-81 P co CCGG 218.650 -999.990 W.. R4 1991 05 29 13 53 00 76.2470 -119.3533 33.00 30.00 3.00 74281 MBC 1991 04 28 15 22 00 514-81 P co CCGG 483.570 -999.990 W.C R4 1991 05 29 15 35 00 76.2470 -119.3533 33.00 30.00 3.00 74283 MBC 1991 04 28 15 22 00 514-81 P co CCGG 488.170 -999.990 W.C R4 1991 05 29 15 51 00 76.2470 -119.3533 33.00 30.00 3.00 74283 MBC 1991 05 05 15 27 00 1406-81 P co CCGG 175.720 -999.990 W.. R4 1991 06 17 12 08 00 76.2470 -119.3533 33.00 30.00 3.00 74285 MBC 1991 05 05 15 27 00 1406-81 P co CCGG 177.110 -999.990 W.. R4 1991 06 17 12 26 00 76.2470 -119.3533 33.00 30.00 3.00 74285 MBC 1991 05 08 22 28 00 952-81 P co CCGG 188.520 -999.990 W.. R4 1991 06 17 11 35 00 76.2470 -119.3533 35.00 30.00 5.00 74287 MBC 1991 05 08 22 28 00 952-81 P co CCGG 189.480 -999.990 W.. R4 1991 06 17 11 51 00 76.2470 -119.3533 35.00 30.00 5.00 74287 MBC 1991 05 12 15 27 00 408-81 P co CCGG 187.820 -999.990 W.. R4 1991 06 17 12 42 00 76.2470 -119.3533 35.00 30.00 5.00 74289 MBC 1991 05 12 15 27 00 408-81 P co CCGG 189.310 -999.990 W.. R4 1991 06 17 12 59 00 76.2470 -119.3533 35.00 30.00 5.00 74289 MBC 1991 05 15 09 20 00 256-81 P co CCGG 165.630 -999.990 W.. R4 1991 06 17 11 02 00 76.2470 -119.3533 35.00 30.00 5.00 74291 MBC 1991 05 15 09 20 00 256-81 P co CCGG 165.180 -999.990 W.. R4 1991 06 17 11 18 00 76.2470 -119.3533 35.00 30.00 5.00 74291 MBC 1991 05 19 15 54 00 812-81 P co CCGG 161.070 -999.990 W.. R4 1991 06 17 10 10 00 76.2470 -119.3533 35.00 30.00 5.00 74293 MBC 1991 05 19 15 54 00 812-81 P co CCGG 160.460 -999.990 W.. R4 1991 06 17 10 27 00 76.2470 -119.3533 35.00 30.00 5.00 74293 MBC 1991 05 23 01 49 00 251-81 P co CCGG 165.340 -999.990 W.. R4 1991 06 18 09 09 00 76.2470 -119.3533 35.00 30.00 5.00 74294 MBC 1991 05 23 01 49 00 252-81 P co CCGG 163.110 -999.990 W.. R4 1991 06 17 10 45 00 76.2470 -119.3533 35.00 30.00 5.00 74295 MBC 1991 05 26 08 31 00 286-81 P co CCGG 173.670 -999.990 W.. R4 1991 07 03 11 38 00 76.2470 -119.3533 35.00 30.00 5.00 74297 MBC 1991 05 30 05 22 00 1369-81 P co CCGG 145.820 -999.990 W.. R4 1991 07 08 12 37 00 76.2470 -119.3533 35.00 30.00 5.00 74298 MBC 1991 05 30 05 22 00 1369-81 P co CCGG 146.120 -999.990 W.. R4 1991 07 08 12 53 00 76.2470 -119.3533 35.00 30.00 5.00 74298 MBC 1991 06 01 23 03 00 758-81 P co CCGG 169.750 -999.990 W.. R4 1991 07 08 13 12 00 76.2470 -119.3533 35.00 30.00 5.00 74301 MBC 1991 06 01 23 03 00 758-81 P co CCGG 170.970 -999.990 W.. R4 1991 07 08 13 30 00 76.2470 -119.3533 35.00 30.00 5.00 74301 MBC 1991 06 08 06 26 00 384-81 P co CCGG 140.030 -999.990 W.. R4 1991 07 03 14 30 00 76.2470 -119.3533 35.00 30.00 5.00 74303 MBC 1991 06 08 06 26 00 384-81 P co CCGG 140.670 -999.990 W.. R4 1991 07 03 14 47 00 76.2470 -119.3533 35.00 30.00 5.00 74303 MBC 1991 06 10 19 01 00 718-81 P co CCGG 316.490 -999.990 W.C R4 1991 07 29 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74305 MBC 1991 06 10 19 01 00 718-81 P co CCGG 320.120 -999.990 W.C R4 1991 07 29 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74305 MBC 1991 06 12 05 50 00 1460-81 P co CCGG 296.140 -999.990 W.C R4 1991 07 29 12 47 00 76.2470 -119.3533 35.00 30.00 5.00 74307 MBC 1991 06 12 05 50 00 1460-81 P co CCGG 290.050 -999.990 W.C R4 1991 07 29 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 74307 MBC 1991 06 17 06 02 00 184-81 P co CCGG 135.640 -999.990 W.< R4 1991 07 29 18 40 00 76.2470 -119.3533 35.00 30.00 5.00 74311 MBC 1991 06 17 06 02 00 184-81 P co CCGG -999.990 -999.990 *.. R4 1991 07 29 18 58 00 76.2470 -119.3533 35.00 30.00 5.00 74311 MBC 1991 06 20 15 51 00 743-81 P co CCGG 124.890 -999.990 W.. R4 1991 07 30 21 26 00 76.2470 -119.3533 35.00 30.00 5.00 74312 MBC 1991 06 20 15 51 00 743-81 P co CCGG 125.350 -999.990 W.. R4 1991 07 30 21 42 00 76.2470 -119.3533 35.00 30.00 5.00 74312 MBC 1991 06 20 15 51 00 744-81 P co CCGG 140.740 -999.990 W.> R4 1991 07 29 19 16 00 76.2470 -119.3533 35.00 30.00 5.00 74313 MBC 1991 06 24 03 53 00 1288-81 P co CCGG 108.470 -999.990 W.. R4 1991 07 29 18 06 00 76.2470 -119.3533 35.00 30.00 5.00 74315 MBC 1991 06 24 03 53 00 1288-81 P co CCGG 108.410 -999.990 W.. R4 1991 07 29 18 23 00 76.2470 -119.3533 35.00 30.00 5.00 74315 MBC 1991 06 30 19 14 00 1024-81 P co CCGG 102.400 -999.990 W.. R4 1991 07 29 20 08 00 76.2470 -119.3533 35.00 30.00 5.00 74319 MBC 1991 07 04 06 00 00 196-81 P co CCGG 191.180 -999.990 W.. R4 1991 07 29 17 33 00 76.2470 -119.3533 35.00 30.00 5.00 74321 MBC 1991 07 04 06 00 00 196-81 P co CCGG 191.700 -999.990 W.. R4 1991 07 29 17 49 00 76.2470 -119.3533 35.00 30.00 5.00 74321 MBC 1991 07 07 16 45 00 1559-81 P co CCGG 227.480 -999.990 W.. R4 1991 08 28 11 01 00 76.2470 -119.3533 35.00 30.00 5.00 74322 MBC 1991 07 17 19 00 00 1554-81 P co CCGG 101.560 -999.990 W.. R4 1991 08 28 09 10 00 76.2470 -119.3533 35.00 30.00 5.00 74327 MBC 1991 07 21 17 45 00 1549-81 P co CCGG 98.590 -999.990 W.. R4 1991 08 28 11 20 00 76.2470 -119.3533 35.00 30.00 5.00 74328 MBC 1991 07 24 08 23 00 1551-81 P co CCGG 100.060 -999.990 W.. R4 1991 08 28 11 39 00 76.2470 -119.3533 35.00 30.00 5.00 74330 MBC 1991 07 24 08 23 00 1552-81 P co CCGG 98.740 -999.990 W.. R4 1991 08 27 18 20 00 76.2470 -119.3533 35.00 30.00 5.00 74331 MBC 1991 08 04 15 03 00 593-81 P co CCGG 150.410 -999.990 W.. R4 1991 10 15 12 51 00 76.2470 -119.3533 35.00 30.00 5.00 74336 MBC 1991 08 04 15 03 00 594-81 P co CCGG 187.600 -999.990 W.. R4 1991 10 15 13 08 00 76.2470 -119.3533 35.00 30.00 5.00 74337 MBC 1991 08 13 22 13 00 467-81 P co CCGG 119.260 -999.990 W.. R4 1991 10 15 12 33 00 76.2470 -119.3533 35.00 30.00 5.00 74338 MBC 1991 08 20 03 17 00 149-81 P co CCGG 157.580 -999.990 W.. R4 1991 10 15 09 40 00 76.2470 -119.3533 35.00 30.00 5.00 74340 MBC 1991 08 20 03 17 00 150-81 P co CCGG 112.480 -999.990 W.. R4 1991 10 15 09 56 00 76.2470 -119.3533 35.00 30.00 5.00 74341 MBC 1991 08 22 04 41 00 541-81 P co CCGG 119.830 -999.990 W.. R4 1991 10 15 10 46 00 76.2470 -119.3533 35.00 30.00 5.00 74342 MBC 1991 08 22 04 41 00 542-81 P co CCGG 297.600 -999.990 W.C R4 1991 10 15 11 03 00 76.2470 -119.3533 35.00 30.00 5.00 74343 MBC 1991 08 25 22 33 00 15-81 P co CCGG 234.270 -999.990 W.C R4 1991 10 15 10 12 00 76.2470 -119.3533 35.00 30.00 5.00 74344 MBC 1991 08 25 22 33 00 16-81 P co CCGG 302.250 -999.990 W.C R4 1991 10 15 10 28 00 76.2470 -119.3533 35.00 30.00 5.00 74345 MBC 1991 08 29 22 30 00 415-81 P co CCGG 138.760 -999.990 W.. R4 1991 10 15 09 07 00 76.2470 -119.3533 35.00 30.00 5.00 74346 MBC 1991 08 29 22 30 00 416-81 P co CCGG 168.350 -999.990 W.. R4 1991 10 15 09 23 00 76.2470 -119.3533 35.00 30.00 5.00 74347 MBC 1991 09 02 02 28 00 504-81 P co CCGG 121.460 -999.990 W.. R4 1991 10 11 16 09 00 76.2470 -119.3533 35.00 30.00 5.00 74349 MBC 1991 09 04 14 23 00 153-81 P co CCGG 122.300 -999.990 W.. R4 1991 10 11 15 34 00 76.2470 -119.3533 35.00 30.00 5.00 74350 MBC 1991 09 04 14 23 00 154-81 P co CCGG 113.560 -999.990 W.. R4 1991 10 11 15 50 00 76.2470 -119.3533 35.00 30.00 5.00 74351 MBC 1991 09 08 14 07 00 1255-81 P co CCGG 120.720 -999.990 W.. R4 1991 10 15 11 58 00 76.2470 -119.3533 35.00 30.00 5.00 74352 MBC 1991 09 08 14 07 00 1256-81 P co CCGG 170.420 -999.990 W.. R4 1991 10 15 12 14 00 76.2470 -119.3533 35.00 30.00 5.00 74353 MBC 1991 09 08 16 20 00 1429-81 P co CCGG 108.050 -999.990 W.. R4 1991 10 11 10 27 00 76.2470 -119.3533 35.00 30.00 5.00 74354 MBC 1991 09 08 16 20 00 1430-81 P co CCGG 110.950 -999.990 W.. R4 1991 10 11 10 43 00 76.2470 -119.3533 35.00 30.00 5.00 74355 MBC 1991 09 12 06 57 00 303-81 P co CCGG 125.380 -999.990 W.. R4 1991 10 23 10 03 00 76.2470 -119.3533 35.00 30.00 5.00 74356 MBC 1991 09 12 06 57 00 304-81 P co CCGG 131.460 -999.990 W.. R4 1991 10 23 09 46 00 76.2470 -119.3533 35.00 30.00 5.00 74357 MBC 1991 09 15 22 03 00 47-81 P co CCGG 127.040 -999.990 W.. R4 1991 10 23 10 19 00 76.2470 -119.3533 35.00 30.00 5.00 74358 MBC 1991 09 15 22 03 00 48-81 P co CCGG 140.080 -999.990 W.. R4 1991 10 23 10 35 00 76.2470 -119.3533 35.00 30.00 5.00 74359 MBC 1991 09 19 05 05 00 10-81 P co CCGG 126.030 -999.990 W.. R4 1991 10 23 11 14 00 76.2470 -119.3533 35.00 30.00 5.00 74361 MBC 1991 09 19 05 05 00 9-81 P co CCGG 111.580 -999.990 W.. R4 1991 10 23 10 58 00 76.2470 -119.3533 35.00 30.00 5.00 74360 MBC 1991 09 24 08 35 00 1235-81 P co CCGG 128.100 -999.990 W.. R4 1991 10 23 11 31 00 76.2470 -119.3533 35.00 30.00 5.00 74362 MBC 1991 09 24 08 35 00 1236-81 P co CCGG 143.470 -999.990 W.. R4 1991 10 23 11 50 00 76.2470 -119.3533 35.00 30.00 5.00 74363 MBC 1991 09 26 02 46 00 1291-81 P co CCGG 122.230 -999.990 W.. R4 1991 11 08 11 16 00 76.2470 -119.3533 35.00 30.00 5.00 74364 MBC 1991 09 26 02 46 00 1292-81 P co CCGG 139.500 -999.990 W.. R4 1991 11 08 11 32 00 76.2470 -119.3533 35.00 30.00 5.00 74365 MBC 1991 09 28 18 40 00 951-81 P co CCGG 139.680 -999.990 W.. R4 1991 11 08 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 74366 MBC 1991 09 28 18 40 00 952-81 P co CCGG 131.090 -999.990 W.. R4 1991 11 08 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 74367 MBC 1991 10 02 16 45 00 1011-81 P co CCGG 120.470 -999.990 W.. R4 1991 11 08 13 44 00 76.2470 -119.3533 35.00 30.00 5.00 74368 MBC 1991 10 02 16 45 00 1012-81 P co CCGG 125.770 -999.990 W.. R4 1991 11 08 14 00 00 76.2470 -119.3533 35.00 30.00 5.00 74369 MBC 1991 10 07 01 58 00 1281-81 P co CCGG 117.750 -999.990 W.. R4 1991 11 08 11 50 00 76.2470 -119.3533 35.00 30.00 5.00 74370 MBC 1991 10 07 01 58 00 1282-81 P co CCGG 117.830 -999.990 W.. R4 1991 11 08 12 07 00 76.2470 -119.3533 35.00 30.00 5.00 74371 MBC 1991 10 10 01 30 00 1237-81 P co CCGG 118.430 -999.990 W.. R4 1991 11 08 14 49 00 76.2470 -119.3533 35.00 30.00 5.00 74372 MBC 1991 10 10 01 30 00 1238-81 P co CCGG 124.380 -999.990 W.. R4 1991 11 08 15 05 00 76.2470 -119.3533 35.00 30.00 5.00 74373 MBC 1991 10 13 16 51 00 767-81 P co CCGG 118.740 -999.990 W.. R4 1991 11 08 14 16 00 76.2470 -119.3533 35.00 30.00 5.00 74374 MBC 1991 10 13 16 51 00 768-81 P co CCGG 121.440 -999.990 W.. R4 1991 11 08 14 33 00 76.2470 -119.3533 35.00 30.00 5.00 74375 MBC 1991 10 18 09 17 00 1481-81 P co CCGG 148.670 -999.990 W.. R4 1991 12 06 09 53 00 76.2470 -119.3533 35.00 30.00 5.00 74376 MBC 1991 10 18 09 17 00 1482-81 P co CCGG 149.170 -999.990 W.. R4 1991 12 06 10 10 00 76.2470 -119.3533 35.00 30.00 5.00 74377 MBC 1991 10 20 21 49 00 1311-81 P co CCGG 131.090 -999.990 W.. R4 1991 12 06 10 26 00 76.2470 -119.3533 35.00 30.00 5.00 74378 MBC 1991 10 20 21 49 00 1312-81 P co CCGG 138.050 -999.990 W.. R4 1991 12 06 10 43 00 76.2470 -119.3533 35.00 30.00 5.00 74379 MBC 1991 10 24 13 55 00 1475-81 P co CCGG 136.870 -999.990 W.. R4 1991 12 05 17 22 00 76.2470 -119.3533 35.00 30.00 5.00 74380 MBC 1991 10 24 13 55 00 1476-81 P co CCGG 130.410 -999.990 W.. R4 1991 12 05 17 38 00 76.2470 -119.3533 35.00 30.00 5.00 74381 MBC 1991 10 28 00 03 00 1169-81 P co CCGG 130.480 -999.990 W.. R4 1991 12 05 16 14 00 76.2470 -119.3533 35.00 30.00 5.00 74382 MBC 1991 10 28 00 03 00 1170-81 P co CCGG 137.740 -999.990 W.. R4 1991 12 05 16 30 00 76.2470 -119.3533 35.00 30.00 5.00 74383 MBC 1991 10 31 19 54 00 79-81 P co CCGG 131.560 -999.990 W.. R4 1991 12 06 09 20 00 76.2470 -119.3533 35.00 30.00 5.00 74384 MBC 1991 10 31 19 54 00 80-81 P co CCGG 136.640 -999.990 W.. R4 1991 12 06 09 37 00 76.2470 -119.3533 35.00 30.00 5.00 74385 MBC 1991 11 04 01 39 00 1035-81 P co CCGG 147.050 -999.990 W.. R4 1991 12 06 09 04 00 76.2470 -119.3533 35.00 30.00 5.00 74386 MBC 1991 11 04 01 39 00 1036-81 P co CCGG 140.270 -999.990 W.. R4 1991 12 06 08 48 00 76.2470 -119.3533 35.00 30.00 5.00 74387 MBC 1991 11 07 16 14 00 975-81 P co CCGG 132.850 -999.990 W.. R4 1991 12 19 15 19 00 76.2470 -119.3533 35.00 30.00 5.00 74388 MBC 1991 11 07 16 14 00 976-81 P co CCGG 127.580 -999.990 W.. R4 1991 12 19 15 35 00 76.2470 -119.3533 35.00 30.00 5.00 74389 MBC 1991 11 12 03 15 00 1245-81 P co CCGG 127.250 -999.990 W.. R4 1991 12 19 15 52 00 76.2470 -119.3533 35.00 30.00 5.00 74390 MBC 1991 11 12 03 15 00 1246-81 P co CCGG 128.060 -999.990 W.. R4 1991 12 19 16 08 00 76.2470 -119.3533 35.00 30.00 5.00 74391 MBC 1991 11 13 22 23 00 843-81 P co CCGG 144.950 -999.990 W.. R4 1991 12 19 12 41 00 76.2470 -119.3533 35.00 30.00 5.00 74392 MBC 1991 11 13 22 23 00 844-81 P co CCGG 130.680 -999.990 W.. R4 1991 12 19 12 57 00 76.2470 -119.3533 35.00 30.00 5.00 74393 MBC 1991 11 17 22 56 00 421-81 P co CCGG 149.490 -999.990 W.. R4 1991 12 19 11 32 00 76.2470 -119.3533 35.00 30.00 5.00 74394 MBC 1991 11 17 22 56 00 422-81 P co CCGG 138.980 -999.990 W.. R4 1991 12 19 11 48 00 76.2470 -119.3533 35.00 30.00 5.00 74395 MBC 1991 11 18 01 25 00 931-81 P co CCGG 176.180 -999.990 W.. R4 1992 01 17 14 30 00 76.2470 -119.3533 35.00 30.00 5.00 74396 MBC 1991 11 18 01 25 00 932-81 P co CCGG 188.770 -999.990 W.. R4 1992 01 17 14 47 00 76.2470 -119.3533 35.00 30.00 5.00 74397 MBC 1991 11 20 17 03 00 1295-81 P co CCGG 143.690 -999.990 W.. R4 1992 01 21 09 44 00 76.2470 -119.3533 35.00 30.00 5.00 74398 MBC 1991 11 20 17 03 00 1296-81 P co CCGG 142.380 -999.990 W.. R4 1992 01 21 10 00 00 76.2470 -119.3533 35.00 30.00 5.00 74399 MBC 1991 11 24 09 13 00 323-81 P co CCGG 152.150 -999.990 W.. R4 1992 01 21 11 00 00 76.2470 -119.3533 35.00 30.00 5.00 74400 MBC 1991 11 24 09 13 00 324-81 P co CCGG 190.910 -999.990 W.. R4 1992 01 21 11 17 00 76.2470 -119.3533 35.00 30.00 5.00 74401 MBC 1991 11 28 10 10 00 549-81 P co CCGG 162.160 -999.990 W.. R4 1992 01 21 09 09 00 76.2470 -119.3533 35.00 30.00 5.00 74402 MBC 1991 11 28 10 10 00 550-81 P co CCGG 162.370 -999.990 W.. R4 1992 01 21 09 26 00 76.2470 -119.3533 35.00 30.00 5.00 74403 MBC 1991 12 06 01 40 00 825-81 P co CCGG 155.550 -999.990 W.. R4 1992 01 21 08 36 00 76.2470 -119.3533 35.00 30.00 5.00 74404 MBC 1991 12 06 01 40 00 826-81 P co CCGG 158.440 -999.990 W.. R4 1992 01 21 08 52 00 76.2470 -119.3533 35.00 30.00 5.00 74405 MBC 1991 12 08 13 35 00 1181-81 P co CCGG 163.350 -999.990 W.. R4 1992 01 17 13 22 00 76.2470 -119.3533 35.00 30.00 5.00 74406 MBC 1991 12 08 13 35 00 1182-81 P co CCGG 169.530 -999.990 W.. R4 1992 01 17 13 39 00 76.2470 -119.3533 35.00 30.00 5.00 74407 MBC 1991 12 12 13 20 00 497-81 P co CCGG 162.010 -999.990 W.. R4 1992 01 21 10 18 00 76.2470 -119.3533 35.00 30.00 5.00 74408 MBC 1991 12 12 13 20 00 498-81 P co CCGG 162.070 -999.990 W.. R4 1992 01 21 10 35 00 76.2470 -119.3533 35.00 30.00 5.00 74409 MBC 1991 12 15 22 30 00 925-81 P co CCGG 156.910 -999.990 W.. R4 1992 01 17 13 56 00 76.2470 -119.3533 35.00 30.00 5.00 74410 MBC 1991 12 15 22 30 00 926-81 P co CCGG 171.560 -999.990 W.. R4 1992 01 17 14 13 00 76.2470 -119.3533 35.00 30.00 5.00 74411 MBC 1991 12 23 16 07 00 241-81 P co CCGG 192.970 -999.990 W.. R4 1992 02 06 12 59 00 76.2470 -119.3533 35.00 30.00 5.00 74412 MBC 1991 12 23 16 07 00 242-81 P co CCGG 187.320 -999.990 W.. R4 1992 02 06 13 15 00 76.2470 -119.3533 35.00 30.00 5.00 74413 MBC 1991 12 27 01 30 00 507-81 P co CCGG 175.410 -999.990 W.. R4 1992 02 06 12 26 00 76.2470 -119.3533 35.00 30.00 5.00 74414 MBC 1991 12 27 01 30 00 508-81 P co CCGG 177.210 -999.990 W.. R4 1992 02 06 12 42 00 76.2470 -119.3533 35.00 30.00 5.00 74415 MBC 1991 12 29 00 57 00 1291-81 P co CCGG 191.470 -999.990 W.. R4 1992 02 06 08 50 00 76.2470 -119.3533 35.00 30.00 5.00 74416 MBC 1991 12 29 00 57 00 1292-81 P co CCGG 202.160 -999.990 W.. R4 1992 02 06 09 06 00 76.2470 -119.3533 35.00 30.00 5.00 74417 MBC 1992 01 02 12 57 00 473-81 P co CCGG 262.290 -999.990 W.C R4 1992 02 06 09 22 00 76.2470 -119.3533 35.00 30.00 5.00 74418 MBC 1992 01 02 12 57 00 474-81 P co CCGG 230.180 -999.990 W.C R4 1992 02 06 09 38 00 76.2470 -119.3533 35.00 30.00 5.00 74419 MBC 1992 01 05 12 25 00 107-81 P co CCGG 219.440 -999.990 W.. R4 1992 02 06 09 55 00 76.2470 -119.3533 35.00 30.00 5.00 74420 MBC 1992 01 05 12 25 00 108-81 P co CCGG 240.330 -999.990 W.C R4 1992 02 06 10 12 00 76.2470 -119.3533 35.00 30.00 5.00 74421 MBC 1992 01 10 10 10 00 767-81 P co CCGG 193.030 -999.990 W.. R4 1992 02 26 13 53 00 76.2470 -119.3533 35.00 30.00 5.00 74422 MBC 1992 01 10 10 10 00 768-81 P co CCGG 192.960 -999.990 W.. R4 1992 02 26 14 09 00 76.2470 -119.3533 35.00 30.00 5.00 74423 MBC 1992 01 14 22 35 00 51-81 P co CCGG 213.270 -999.990 W.. R4 1992 02 26 11 50 00 76.2470 -119.3533 35.00 30.00 5.00 74424 MBC 1992 01 14 22 35 00 52-81 P co CCGG 190.310 -999.990 W.. R4 1992 02 26 12 06 00 76.2470 -119.3533 35.00 30.00 5.00 74425 MBC 1992 02 22 13 53 00 6525-66 P co CCGG 184.450 -999.990 ... R4 1992 05 14 10 23 00 76.2470 -119.3533 35.00 30.00 5.00 74426 MBC 1992 02 22 13 53 00 6526-66 P co CCGG 184.290 -999.990 ... R4 1992 05 14 10 39 00 76.2470 -119.3533 35.00 30.00 5.00 74427 MBC 1992 02 26 18 56 00 6528-66 P co CCGG 187.040 -999.990 ... R4 1992 05 12 18 52 00 76.2470 -119.3533 35.00 30.00 5.00 74428 MBC 1992 02 29 17 45 00 6346-66 P co CCGG 198.680 -999.990 ... R4 1992 03 26 16 11 00 76.2470 -119.3533 35.00 30.00 5.00 74429 MBC 1992 03 04 15 35 00 6523-66 P co CCGG 202.370 -999.990 ... R4 1992 03 26 15 38 00 76.2470 -119.3533 35.00 30.00 5.00 74430 MBC 1992 03 04 15 35 00 6524-66 P co CCGG 202.520 -999.990 ... R4 1992 03 26 15 55 00 76.2470 -119.3533 35.00 30.00 5.00 74431 MBC 1992 03 07 22 16 00 6511-66 P co CCGG 197.730 -999.990 ... R4 1992 05 14 11 27 00 76.2470 -119.3533 35.00 30.00 5.00 74432 MBC 1992 03 07 22 16 00 6512-66 P co CCGG 197.810 -999.990 ... R4 1992 05 14 11 43 00 76.2470 -119.3533 35.00 30.00 5.00 74433 MBC 1992 03 13 19 34 00 6509-66 P co CCGG 190.780 -999.990 ... R4 1992 05 14 10 55 00 76.2470 -119.3533 35.00 30.00 5.00 74434 MBC 1992 03 13 19 34 00 6510-66 P co CCGG 190.580 -999.990 ... R4 1992 05 14 11 11 00 76.2470 -119.3533 35.00 30.00 5.00 74435 MBC 1992 03 14 16 26 00 6521-66 P co CCGG 198.670 -999.990 ... R4 1992 05 15 09 28 00 76.2470 -119.3533 35.00 30.00 5.00 74436 MBC 1992 03 14 16 26 00 6522-66 P co CCGG 197.440 -999.990 ... R4 1992 05 15 09 44 00 76.2470 -119.3533 35.00 30.00 5.00 74437 MBC 1992 03 18 22 00 00 6517-66 P co CCGG 177.360 -999.990 .X. R4 1992 05 15 07 41 00 76.2470 -119.3533 35.00 30.00 5.00 74438 MBC 1992 03 18 22 00 00 6518-66 P co CCGG 177.490 -999.990 .X. R4 1992 05 15 07 57 00 76.2470 -119.3533 35.00 30.00 5.00 74439 MBC 1992 03 21 22 22 00 6035-66 P co CCGG 182.770 -999.990 ... R4 1992 05 15 10 33 00 76.2470 -119.3533 35.00 30.00 5.00 74440 MBC 1992 03 21 22 22 00 6036-66 P co CCGG 181.880 -999.990 ... R4 1992 05 15 10 49 00 76.2470 -119.3533 35.00 30.00 5.00 74441 MBC 1992 03 25 22 24 00 6023-66 P co CCGG 189.260 -999.990 ... R4 1992 05 15 10 00 00 76.2470 -119.3533 35.00 30.00 5.00 74442 MBC 1992 03 25 22 24 00 6024-66 P co CCGG 191.820 -999.990 ... R4 1992 05 15 10 16 00 76.2470 -119.3533 35.00 30.00 5.00 74443 MBC 1992 03 29 22 06 00 6087-66 P co CCGG 198.760 -999.990 ... R4 1992 05 20 07 03 00 76.2470 -119.3533 35.00 30.00 5.00 74444 MBC 1992 03 29 22 06 00 6088-66 P co CCGG 198.250 -999.990 ... R4 1992 05 20 07 19 00 76.2470 -119.3533 35.00 30.00 5.00 74445 MBC 1992 04 02 22 16 00 6181-66 P co CCGG 195.190 -999.990 ... R4 1992 05 20 08 43 00 76.2470 -119.3533 35.00 30.00 5.00 74446 MBC 1992 04 02 22 16 00 6182-66 P co CCGG 197.220 -999.990 ... R4 1992 05 20 08 59 00 76.2470 -119.3533 35.00 30.00 5.00 74447 MBC 1992 04 06 08 23 00 6094-66 P co CCGG 219.280 -999.990 .X. R4 1992 05 18 17 03 00 76.2470 -119.3533 35.00 30.00 5.00 74448 MBC 1992 04 08 17 23 00 6375-66 P co CCGG 190.180 -999.990 ... R4 1992 05 18 18 25 00 76.2470 -119.3533 35.00 30.00 5.00 74449 MBC 1992 04 08 17 23 00 6376-66 P co CCGG 190.020 -999.990 ... R4 1992 05 18 18 41 00 76.2470 -119.3533 35.00 30.00 5.00 74450 MBC 1992 04 11 17 30 00 6321-66 P co CCGG 193.350 -999.990 ... R4 1992 05 18 17 52 00 76.2470 -119.3533 35.00 30.00 5.00 74451 MBC 1992 04 11 17 30 00 6322-66 P co CCGG 191.900 -999.990 ... R4 1992 05 18 18 09 00 76.2470 -119.3533 35.00 30.00 5.00 74452 MBC 1992 04 15 23 50 00 6305-66 P co CCGG 191.130 -999.990 P.. R4 1992 05 18 17 20 00 76.2470 -119.3533 35.00 30.00 5.00 74453 MBC 1992 04 15 23 50 00 6306-66 P co CCGG 186.250 -999.990 P.. R4 1992 05 18 17 36 00 76.2470 -119.3533 35.00 30.00 5.00 74454 MBC 1992 06 06 19 58 00 6283-66 P co CCGG 137.560 -999.990 ... R4 1992 07 09 12 54 00 76.2470 -119.3533 35.00 30.00 5.00 74455 MBC 1992 06 06 19 58 00 6284-66 P co CCGG 136.560 -999.990 ... R4 1992 07 09 13 11 00 76.2470 -119.3533 35.00 30.00 5.00 74456 MBC 1992 06 10 22 32 00 6677-66 P co CCGG 140.020 -999.990 ... R4 1992 07 09 12 22 00 76.2470 -119.3533 35.00 30.00 5.00 74457 MBC 1992 06 10 22 32 00 6678-66 P co CCGG 138.800 -999.990 ... R4 1992 07 09 12 38 00 76.2470 -119.3533 35.00 30.00 5.00 74458 MBC 1992 06 13 21 30 00 6025-66 P co CCGG 136.190 -999.990 ... R4 1992 07 15 12 10 00 76.2470 -119.3533 35.00 30.00 5.00 74459 MBC 1992 06 13 21 30 00 6026-66 P co CCGG 136.270 -999.990 ... R4 1992 07 15 12 27 00 76.2470 -119.3533 35.00 30.00 5.00 74460 MBC 1992 06 17 19 09 00 6199-66 P co CCGG 128.160 -999.990 ... R4 1992 07 15 11 38 00 76.2470 -119.3533 35.00 30.00 5.00 74461 MBC 1992 06 17 19 09 00 6200-66 P co CCGG 127.510 -999.990 ... R4 1992 07 15 11 54 00 76.2470 -119.3533 35.00 30.00 5.00 74462 MBC 1992 06 21 02 22 00 6643-66 P co CCGG 124.040 -999.990 ... R4 1992 08 05 11 19 00 76.2470 -119.3533 35.00 30.00 5.00 74463 MBC 1992 06 21 02 22 00 6644-66 P co CCGG 124.130 -999.990 ... R4 1992 08 05 11 35 00 76.2470 -119.3533 35.00 30.00 5.00 74464 MBC 1992 06 24 01 37 00 6079-66 P co CCGG 116.250 -999.990 ... R4 1992 08 05 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 74465 MBC 1992 06 24 01 37 00 6080-66 P co CCGG 115.220 -999.990 ... R4 1992 08 05 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 74466 MBC 1992 06 30 22 30 00 6493-66 P co CCGG 97.550 -999.990 ... R4 1992 08 05 10 47 00 76.2470 -119.3533 35.00 30.00 5.00 74467 MBC 1992 06 30 22 30 00 6494-66 P co CCGG 97.250 -999.990 ... R4 1992 08 05 11 03 00 76.2470 -119.3533 35.00 30.00 5.00 74468 MBC 1992 07 05 02 24 00 6121-66 P co CCGG 98.740 -999.990 ... R4 1992 08 05 11 52 00 76.2470 -119.3533 35.00 30.00 5.00 74469 MBC 1992 07 05 02 24 00 6122-66 P co CCGG 98.910 -999.990 ... R4 1992 08 05 12 08 00 76.2470 -119.3533 35.00 30.00 5.00 74470 MBC 1992 07 07 18 30 00 6139-66 P co CCGG 92.580 -999.990 ... R4 1992 07 31 16 07 00 76.2470 -119.3533 35.00 30.00 5.00 74471 MBC 1992 07 07 18 30 00 6140-66 P co CCGG 92.440 -999.990 ... R4 1992 07 31 16 23 00 76.2470 -119.3533 35.00 30.00 5.00 74472 MBC 1992 07 11 01 45 00 6043-66 P co CCGG 90.940 -999.990 ... R4 1992 07 31 15 34 00 76.2470 -119.3533 35.00 30.00 5.00 74473 MBC 1992 07 11 01 45 00 6044-66 P co CCGG 91.060 -999.990 ... R4 1992 07 31 15 50 00 76.2470 -119.3533 35.00 30.00 5.00 74474 MBC 1992 07 15 17 57 00 6265-66 P co CCGG 97.480 -999.990 ... R4 1992 08 28 08 31 00 76.2470 -119.3533 35.00 30.00 5.00 74475 MBC 1992 07 15 17 57 00 6266-66 P co CCGG 96.040 -999.990 ... R4 1992 08 28 08 47 00 76.2470 -119.3533 35.00 30.00 5.00 74476 MBC 1992 07 18 22 00 00 6037-66 P co CCGG 92.760 -999.990 ... R4 1992 08 26 15 44 00 76.2470 -119.3533 35.00 30.00 5.00 74477 MBC 1992 07 18 22 00 00 6038-66 P co CCGG 92.360 -999.990 ... R4 1992 08 26 16 00 00 76.2470 -119.3533 35.00 30.00 5.00 74478 MBC 1992 07 21 16 48 00 6017-66 P co CCGG 91.880 -999.990 ... R4 1992 08 26 16 49 00 76.2470 -119.3533 35.00 30.00 5.00 74479 MBC 1992 07 21 16 48 00 6018-66 P co CCGG 89.440 -999.990 ... R4 1992 08 26 17 05 00 76.2470 -119.3533 35.00 30.00 5.00 74480 MBC 1992 07 25 15 22 00 6399-66 P co CCGG 101.930 -999.990 P.. R4 1992 08 26 16 16 00 76.2470 -119.3533 35.00 30.00 5.00 74481 MBC 1992 07 25 15 22 00 6400-66 P co CCGG 94.670 -999.990 P.. R4 1992 08 26 16 33 00 76.2470 -119.3533 35.00 30.00 5.00 74482 MBC 1992 07 29 23 25 00 6163-66 P co CCGG 91.680 -999.990 ... R4 1992 09 11 13 07 00 76.2470 -119.3533 35.00 30.00 5.00 74483 MBC 1992 07 29 23 25 00 6164-66 P co CCGG 91.980 -999.990 ... R4 1992 09 11 13 23 00 76.2470 -119.3533 35.00 30.00 5.00 74484 MBC 1992 08 03 00 33 00 6475-66 P co CCGG 88.970 -999.990 ... R4 1992 09 11 10 50 00 76.2470 -119.3533 35.00 30.00 5.00 74485 MBC 1992 08 03 00 33 00 6476-66 P co CCGG 88.600 -999.990 ... R4 1992 09 11 11 06 00 76.2470 -119.3533 35.00 30.00 5.00 74486 MBC 1992 08 03 01 05 00 6047-66 P co CCGG 89.780 -999.990 ... R4 1992 09 29 12 50 00 76.2470 -119.3533 35.00 30.00 5.00 74487 MBC 1992 08 03 01 05 00 6048-66 P co CCGG 89.960 -999.990 ... R4 1992 09 29 13 06 00 76.2470 -119.3533 35.00 30.00 5.00 74488 MBC 1992 08 06 15 45 00 6035-66 P co CCGG 97.780 -999.990 ... R4 1992 09 11 11 23 00 76.2470 -119.3533 35.00 30.00 5.00 74489 MBC 1992 08 06 15 45 00 6036-66 P co CCGG 97.510 -999.990 ... R4 1992 09 11 11 39 00 76.2470 -119.3533 35.00 30.00 5.00 74490 MBC 1992 08 15 13 25 00 6571-66 P co CCGG 89.460 -999.990 ... R4 1992 09 29 16 05 00 76.2470 -119.3533 35.00 30.00 5.00 74491 MBC 1992 08 15 13 25 00 6572-66 P co CCGG 88.220 -999.990 ... R4 1992 09 29 16 21 00 76.2470 -119.3533 35.00 30.00 5.00 74492 MBC 1992 08 23 15 40 00 6431-66 P co CCGG 88.710 -999.990 ... R4 1992 09 30 14 00 00 76.2470 -119.3533 35.00 30.00 5.00 74493 MBC 1992 08 23 15 40 00 6432-66 P co CCGG 88.590 -999.990 ... R4 1992 09 30 14 16 00 76.2470 -119.3533 35.00 30.00 5.00 74494 MBC 1992 08 26 14 40 00 6415-66 P co CCGG 86.960 -999.990 ... R4 1992 09 30 15 49 00 76.2470 -119.3533 35.00 30.00 5.00 74495 MBC 1992 08 26 14 40 00 6416-66 P co CCGG 87.130 -999.990 ... R4 1992 09 30 16 05 00 76.2470 -119.3533 35.00 30.00 5.00 74496 MBC 1992 08 29 17 55 00 6627-66 P co CCGG 89.770 -999.990 ... R4 1992 10 29 14 01 00 76.2470 -119.3533 35.00 30.00 5.00 74497 MBC 1992 08 29 17 55 00 6628-66 P co CCGG 91.850 -999.990 ... R4 1992 10 29 14 18 00 76.2470 -119.3533 35.00 30.00 5.00 74498 MBC 1992 09 02 21 55 00 6555-66 P co CCGG 89.230 -999.990 ... R4 1992 10 29 13 29 00 76.2470 -119.3533 35.00 30.00 5.00 74499 MBC 1992 09 02 21 55 00 6556-66 P co CCGG 88.890 -999.990 ... R4 1992 10 29 13 45 00 76.2470 -119.3533 35.00 30.00 5.00 74500 MBC 1992 09 05 22 00 00 6827-66 P co CCGG 90.740 -999.990 ... R4 1992 10 29 11 35 00 76.2470 -119.3533 35.00 30.00 5.00 74501 MBC 1992 09 05 22 00 00 6828-66 P co CCGG 91.900 -999.990 ... R4 1992 10 29 11 51 00 76.2470 -119.3533 35.00 30.00 5.00 74502 MBC 1992 09 09 17 15 00 6543-66 P co CCGG 100.100 -999.990 ... R4 1992 10 29 11 03 00 76.2470 -119.3533 35.00 30.00 5.00 74503 MBC 1992 09 09 17 15 00 6544-66 P co CCGG 100.680 -999.990 ... R4 1992 10 29 11 19 00 76.2470 -119.3533 35.00 30.00 5.00 74504 MBC 1992 09 16 11 10 00 6373-66 P co CCGG 100.500 -999.990 P.. R4 1992 10 29 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 74505 MBC 1992 09 16 11 10 00 6374-66 P co CCGG 128.910 -999.990 P.. R4 1992 10 29 12 57 00 76.2470 -119.3533 35.00 30.00 5.00 74506 MBC 1992 09 19 10 10 00 6219-66 P co CCGG 101.100 -999.990 ... R4 1992 10 29 12 07 00 76.2470 -119.3533 35.00 30.00 5.00 74507 MBC 1992 09 19 10 10 00 6220-66 P co CCGG 101.900 -999.990 ... R4 1992 10 29 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 74508 MBC 1992 09 30 22 15 00 6549-66 P co CCGG 114.820 -999.990 ... R4 1992 10 29 14 34 00 76.2470 -119.3533 35.00 30.00 5.00 74509 MBC 1992 09 30 22 15 00 6550-66 P co CCGG 114.110 -999.990 ... R4 1992 10 29 14 50 00 76.2470 -119.3533 35.00 30.00 5.00 74510 MBC 1992 10 03 22 40 00 6465-66 P co CCGG 113.430 -999.990 ... R4 1992 10 29 15 06 00 76.2470 -119.3533 35.00 30.00 5.00 74511 MBC 1992 10 03 22 40 00 6466-66 P co CCGG 115.470 -999.990 ... R4 1992 10 29 15 23 00 76.2470 -119.3533 35.00 30.00 5.00 74512 MBC 1992 10 07 23 00 00 6287-66 P co CCGG 116.810 -999.990 ... R4 1993 01 26 18 12 00 76.2470 -119.3533 35.00 30.00 5.00 74513 MBC 1992 10 07 23 00 00 6288-66 P co CCGG 117.410 -999.990 ... R4 1993 01 26 18 28 00 76.2470 -119.3533 35.00 30.00 5.00 74514 MBC 1992 10 11 16 19 00 6105-66 P co CCGG 116.660 -999.990 ... R4 1993 01 26 17 40 00 76.2470 -119.3533 35.00 30.00 5.00 74515 MBC 1992 10 11 16 19 00 6106-66 P co CCGG 117.240 -999.990 ... R4 1993 01 26 17 56 00 76.2470 -119.3533 35.00 30.00 5.00 74516 MBC 1992 10 14 17 25 00 6647-66 P co CCGG 117.590 -999.990 ... R4 1993 01 26 10 47 00 76.2470 -119.3533 35.00 30.00 5.00 74517 MBC 1992 10 14 17 25 00 6648-66 P co CCGG 117.160 -999.990 ... R4 1993 01 26 11 03 00 76.2470 -119.3533 35.00 30.00 5.00 74518 MBC 1992 10 19 21 38 00 6699-66 P co CCGG 124.020 -999.990 ... R4 1993 01 26 11 52 00 76.2470 -119.3533 35.00 30.00 5.00 74519 MBC 1992 10 19 21 38 00 6700-66 P co CCGG 124.030 -999.990 ... R4 1993 01 26 12 08 00 76.2470 -119.3533 35.00 30.00 5.00 74520 MBC 1992 10 28 16 07 00 6160-66 P co CCGG 118.900 -999.990 ... R4 1993 01 26 19 00 00 76.2470 -119.3533 35.00 30.00 5.00 74521 MBC 1992 10 31 21 35 00 6337-66 P co CCGG 124.150 -999.990 ... R4 1993 01 26 17 07 00 76.2470 -119.3533 35.00 30.00 5.00 74522 MBC 1992 10 31 21 35 00 6338-66 P co CCGG 124.670 -999.990 ... R4 1993 01 26 17 23 00 76.2470 -119.3533 35.00 30.00 5.00 74523 MBC 1992 11 05 20 15 00 6557-66 P co CCGG 132.820 -999.990 ... R4 1993 01 26 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 74524 MBC 1992 11 05 20 15 00 6558-66 P co CCGG 130.920 -999.990 ... R4 1993 01 26 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 74525 MBC 1992 11 11 10 30 00 6343-66 P co CCGG 143.720 -999.990 ... R4 1993 01 26 08 56 00 76.2470 -119.3533 35.00 30.00 5.00 74526 MBC 1992 11 11 10 30 00 6344-66 P co CCGG 143.610 -999.990 ... R4 1993 01 26 09 12 00 76.2470 -119.3533 35.00 30.00 5.00 74527 MBC 1992 11 16 13 30 00 6701-66 P co CCGG 131.850 -999.990 ... R4 1993 02 03 17 54 00 76.2470 -119.3533 35.00 30.00 5.00 74528 MBC 1992 11 16 13 30 00 6702-66 P co CCGG 131.850 -999.990 ... R4 1993 02 03 18 11 00 76.2470 -119.3533 35.00 30.00 5.00 74529 MBC 1992 11 20 14 20 00 6795-66 P co CCGG 133.890 -999.990 ... R4 1993 02 03 18 27 00 76.2470 -119.3533 35.00 30.00 5.00 74530 MBC 1992 11 20 14 20 00 6796-66 P co CCGG 132.650 -999.990 ... R4 1993 02 03 18 43 00 76.2470 -119.3533 35.00 30.00 5.00 74531 MBC 1992 11 25 19 35 00 6633-66 P co CCGG 140.670 -999.990 ... R4 1993 02 02 15 10 00 76.2470 -119.3533 35.00 30.00 5.00 74532 MBC 1992 11 25 19 35 00 6634-66 P co CCGG 141.040 -999.990 ... R4 1993 02 02 15 26 00 76.2470 -119.3533 35.00 30.00 5.00 74533 MBC 1992 11 29 22 45 00 6753-66 P co CCGG 135.130 -999.990 ... R4 1993 02 02 14 06 00 76.2470 -119.3533 35.00 30.00 5.00 74534 MBC 1992 11 29 22 45 00 6754-66 P co CCGG 135.280 -999.990 ... R4 1993 02 02 14 22 00 76.2470 -119.3533 35.00 30.00 5.00 74535 MBC 1992 12 02 20 00 00 6553-66 P co CCGG 141.080 -999.990 ... R4 1993 02 04 19 30 00 76.2470 -119.3533 35.00 30.00 5.00 74536 MBC 1992 12 02 20 00 00 6554-66 P co CCGG 141.120 -999.990 ... R4 1993 02 04 19 46 00 76.2470 -119.3533 35.00 30.00 5.00 74537 MBC 1992 12 07 16 20 00 6037-66 P co CCGG 144.090 -999.990 ... R4 1993 02 04 20 03 00 76.2470 -119.3533 35.00 30.00 5.00 74538 MBC 1992 12 07 16 20 00 6038-66 P co CCGG 143.850 -999.990 ... R4 1993 02 04 20 19 00 76.2470 -119.3533 35.00 30.00 5.00 74539 MBC 1992 12 09 17 45 00 6811-66 P co CCGG 165.640 -999.990 P.. R4 1993 02 11 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74540 MBC 1992 12 09 17 45 00 6812-66 P co CCGG 162.250 -999.990 P.. R4 1993 02 11 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74541 MBC 1992 12 14 11 10 00 6195-66 P co CCGG 204.920 -999.990 .X. R4 1993 02 11 12 15 00 76.2470 -119.3533 35.00 30.00 5.00 74542 MBC 1992 12 14 11 10 00 6196-66 P co CCGG 206.120 -999.990 .X. R4 1993 02 11 12 31 00 76.2470 -119.3533 35.00 30.00 5.00 74543 MBC 1992 12 16 16 30 00 6703-66 P co CCGG 177.380 -999.990 .X. R4 1993 02 03 15 37 00 76.2470 -119.3533 35.00 30.00 5.00 74544 MBC 1992 12 16 16 30 00 6704-66 P co CCGG 177.480 -999.990 .X. R4 1993 02 03 15 53 00 76.2470 -119.3533 35.00 30.00 5.00 74545 MBC 1992 12 28 03 15 00 6369-66 P co CCGG 173.070 -999.990 ... R4 1993 02 03 16 10 00 76.2470 -119.3533 35.00 30.00 5.00 74546 MBC 1992 12 28 03 15 00 6370-66 P co CCGG 173.580 -999.990 ... R4 1993 02 03 16 26 00 76.2470 -119.3533 35.00 30.00 5.00 74547 MBC 1992 12 30 11 30 00 6691-66 P co CCGG 241.890 -999.990 .XC R4 1993 02 11 10 31 00 76.2470 -119.3533 35.00 30.00 5.00 74548 MBC 1992 12 30 11 30 00 6692-66 P co CCGG 240.620 -999.990 .XC R4 1993 02 11 10 47 00 76.2470 -119.3533 35.00 30.00 5.00 74549 MBC 1993 01 03 10 30 00 6437-66 P co CCGG 195.780 -999.990 .X. R4 1993 02 11 11 04 00 76.2470 -119.3533 35.00 30.00 5.00 74550 MBC 1993 01 03 10 30 00 6438-66 P co CCGG 195.680 -999.990 .X. R4 1993 02 11 11 20 00 76.2470 -119.3533 35.00 30.00 5.00 74551 MBC 1993 01 07 22 30 00 6521-66 P co CCGG 212.690 -999.990 .X. R4 1993 02 11 09 26 00 76.2470 -119.3533 35.00 30.00 5.00 74552 MBC 1993 01 07 22 30 00 6522-66 P co CCGG 212.110 -999.990 .X. R4 1993 02 11 09 42 00 76.2470 -119.3533 35.00 30.00 5.00 74553 MBC 1993 01 11 22 35 00 6117-66 P co CCGG 223.470 -999.990 .X. R4 1993 02 11 09 59 00 76.2470 -119.3533 35.00 30.00 5.00 74554 MBC 1993 01 11 22 35 00 6118-66 P co CCGG 224.690 -999.990 .X. R4 1993 02 11 10 15 00 76.2470 -119.3533 35.00 30.00 5.00 74555 MBC 1993 01 13 23 30 00 6043-66 P co CCGG 193.110 -999.990 .X. R4 1993 02 11 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 74556 MBC 1993 01 13 23 30 00 6044-66 P co CCGG 190.730 -999.990 .X. R4 1993 02 11 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 74557 MBC 1993 01 19 13 30 00 6221-66 P co CCGG 229.440 -999.990 .X. R4 1993 02 11 11 42 00 76.2470 -119.3533 35.00 30.00 5.00 74558 MBC 1993 01 19 13 30 00 6222-66 P co CCGG 228.370 -999.990 .X. R4 1993 02 11 11 59 00 76.2470 -119.3533 35.00 30.00 5.00 74559 MBC 1993 02 13 16 20 00 6831-66 P co CCGG 169.440 -999.990 ... R4 1993 04 14 10 53 00 76.2470 -119.3533 35.00 30.00 5.00 74560 MBC 1993 02 13 16 20 00 6832-66 P co CCGG 171.340 -999.990 ... R4 1993 04 14 11 09 00 76.2470 -119.3533 35.00 30.00 5.00 74561 MBC 1993 02 19 16 20 00 6529-66 P co CCGG 171.070 -999.990 P.. R4 1993 04 14 10 21 00 76.2470 -119.3533 35.00 30.00 5.00 74562 MBC 1993 02 19 16 20 00 6530-66 P co CCGG 174.470 -999.990 P.. R4 1993 04 14 10 37 00 76.2470 -119.3533 35.00 30.00 5.00 74563 MBC 1993 02 21 17 30 00 6609-66 P co CCGG 189.790 -999.990 ... R4 1993 04 19 09 14 00 76.2470 -119.3533 35.00 30.00 5.00 74564 MBC 1993 02 21 17 30 00 6610-66 P co CCGG 188.290 -999.990 ... R4 1993 04 19 09 30 00 76.2470 -119.3533 35.00 30.00 5.00 74565 MBC 1993 02 25 19 00 00 6471-66 P co CCGG 174.180 -999.990 ... R4 1993 04 19 08 42 00 76.2470 -119.3533 35.00 30.00 5.00 74566 MBC 1993 02 25 19 00 00 6472-66 P co CCGG 174.830 -999.990 ... R4 1993 04 19 08 58 00 76.2470 -119.3533 35.00 30.00 5.00 74567 MBC 1993 02 28 17 15 00 6863-66 P co CCGG 184.130 -999.990 ... R4 1993 04 14 09 49 00 76.2470 -119.3533 35.00 30.00 5.00 74568 MBC 1993 02 28 17 15 00 6864-66 P co CCGG 185.500 -999.990 ... R4 1993 04 14 10 05 00 76.2470 -119.3533 35.00 30.00 5.00 74569 MBC 1993 03 04 16 20 00 6865-66 P co CCGG 177.800 -999.990 ... R4 1993 04 14 09 16 00 76.2470 -119.3533 35.00 30.00 5.00 74570 MBC 1993 03 04 16 20 00 6866-66 P co CCGG 177.750 -999.990 ... R4 1993 04 14 09 32 00 76.2470 -119.3533 35.00 30.00 5.00 74571 MBC 1993 03 07 22 30 00 6719-66 P co CCGG 179.970 -999.990 ... R4 1993 04 19 12 04 00 76.2470 -119.3533 35.00 30.00 5.00 74572 MBC 1993 03 07 22 30 00 6720-66 P co CCGG 180.830 -999.990 ... R4 1993 04 19 12 20 00 76.2470 -119.3533 35.00 30.00 5.00 74573 MBC 1993 03 10 22 30 00 6425-66 P co CCGG 181.430 -999.990 ... R4 1993 04 19 11 00 00 76.2470 -119.3533 35.00 30.00 5.00 74574 MBC 1993 03 10 22 30 00 6426-66 P co CCGG 180.910 -999.990 ... R4 1993 04 19 11 16 00 76.2470 -119.3533 35.00 30.00 5.00 74575 MBC 1993 03 14 16 08 00 6009-66 P co CCGG 212.600 -999.990 P.. R4 1993 05 17 10 04 00 76.2470 -119.3533 35.00 30.00 5.00 74576 MBC 1993 03 14 16 08 00 6010-66 P co CCGG 209.220 -999.990 P.. R4 1993 05 17 10 20 00 76.2470 -119.3533 35.00 30.00 5.00 74577 MBC 1993 03 18 23 15 00 6051-66 P co CCGG 201.180 -999.990 P.. R4 1993 05 17 10 36 00 76.2470 -119.3533 35.00 30.00 5.00 74578 MBC 1993 03 18 23 15 00 6052-66 P co CCGG 190.960 -999.990 P.. R4 1993 05 17 10 52 00 76.2470 -119.3533 35.00 30.00 5.00 74579 MBC 1993 03 21 17 15 00 6103-66 P co CCGG 191.450 -999.990 ... R4 1993 05 14 12 05 00 76.2470 -119.3533 35.00 30.00 5.00 74580 MBC 1993 03 21 17 15 00 6104-66 P co CCGG 191.580 -999.990 ... R4 1993 05 14 12 21 00 76.2470 -119.3533 35.00 30.00 5.00 74581 MBC 1993 03 24 11 30 00 6315-66 P co CCGG 194.410 -999.990 ... R4 1993 05 13 16 14 00 76.2470 -119.3533 35.00 30.00 5.00 74582 MBC 1993 03 24 11 30 00 6316-66 P co CCGG 193.860 -999.990 ... R4 1993 05 13 16 30 00 76.2470 -119.3533 35.00 30.00 5.00 74583 MBC 1993 03 28 17 30 00 6105-66 P co CCGG 184.040 -999.990 ... R4 1993 05 17 08 59 00 76.2470 -119.3533 35.00 30.00 5.00 74584 MBC 1993 03 28 17 30 00 6106-66 P co CCGG 181.760 -999.990 ... R4 1993 05 17 09 15 00 76.2470 -119.3533 35.00 30.00 5.00 74585 MBC 1993 04 06 23 30 00 6337-66 P co CCGG 186.800 -999.990 ... R4 1993 05 14 14 58 00 76.2470 -119.3533 35.00 30.00 5.00 74586 MBC 1993 04 06 23 30 00 6338-66 P co CCGG 186.740 -999.990 ... R4 1993 05 14 15 15 00 76.2470 -119.3533 35.00 30.00 5.00 74587 MBC 1993 04 12 02 30 00 6091-66 P co CCGG 184.500 -999.990 ... R4 1993 05 14 11 32 00 76.2470 -119.3533 35.00 30.00 5.00 74588 MBC 1993 04 12 02 30 00 6092-66 P co CCGG 182.600 -999.990 ... R4 1993 05 14 11 49 00 76.2470 -119.3533 35.00 30.00 5.00 74589 MBC 1993 04 18 22 30 00 6709-66 P co CCGG 184.280 -999.990 ... R4 1993 06 16 09 53 00 76.2470 -119.3533 35.00 30.00 5.00 74590 MBC 1993 04 18 22 30 00 6710-66 P co CCGG 184.560 -999.990 ... R4 1993 06 16 10 09 00 76.2470 -119.3533 35.00 30.00 5.00 74591 MBC 1993 04 24 00 30 00 6195-66 P co CCGG 176.020 -999.990 ... R4 1993 06 16 08 48 00 76.2470 -119.3533 35.00 30.00 5.00 74592 MBC 1993 04 24 00 30 00 6196-66 P co CCGG 175.290 -999.990 ... R4 1993 06 16 09 04 00 76.2470 -119.3533 35.00 30.00 5.00 74593 MBC 1993 04 29 16 15 00 6599-66 P co CCGG 176.370 -999.990 ... R4 1993 06 16 09 21 00 76.2470 -119.3533 35.00 30.00 5.00 74594 MBC 1993 04 29 16 15 00 6600-66 P co CCGG 176.860 -999.990 ... R4 1993 06 16 09 37 00 76.2470 -119.3533 35.00 30.00 5.00 74595 MBC 1993 05 03 14 30 00 6837-66 P co CCGG 190.640 -999.990 P.. R4 1993 06 16 10 28 00 76.2470 -119.3533 35.00 30.00 5.00 74596 MBC 1993 05 03 14 30 00 6838-66 P co CCGG 176.100 -999.990 P.. R4 1993 06 16 10 44 00 76.2470 -119.3533 35.00 30.00 5.00 74597 MBC 1993 05 06 04 35 00 6605-66 P co CCGG 163.340 -999.990 ... R4 1993 06 15 16 15 00 76.2470 -119.3533 35.00 30.00 5.00 74598 MBC 1993 05 06 04 35 00 6606-66 P co CCGG 163.050 -999.990 ... R4 1993 06 15 16 31 00 76.2470 -119.3533 35.00 30.00 5.00 74599 MBC 1993 05 10 22 20 00 6677-66 P co CCGG 161.710 -999.990 ... R4 1993 06 16 16 21 00 76.2470 -119.3533 35.00 30.00 5.00 74600 MBC 1993 05 10 22 20 00 6678-66 P co CCGG 161.380 -999.990 ... R4 1993 06 16 16 38 00 76.2470 -119.3533 35.00 30.00 5.00 74601 MBC 1993 05 16 01 40 00 6839-66 P co CCGG 149.980 -999.990 ... R4 1993 06 17 09 38 00 76.2470 -119.3533 35.00 30.00 5.00 74602 MBC 1993 05 16 01 40 00 6840-66 P co CCGG 149.120 -999.990 ... R4 1993 06 17 09 54 00 76.2470 -119.3533 35.00 30.00 5.00 74603 MBC 1993 05 17 22 15 00 6789-66 P co CCGG 156.670 -999.990 ... R4 1993 07 02 12 53 00 76.2470 -119.3533 35.00 30.00 5.00 74604 MBC 1993 05 17 22 15 00 6790-66 P co CCGG 153.800 -999.990 ... R4 1993 07 02 13 09 00 76.2470 -119.3533 35.00 30.00 5.00 74605 MBC 1993 05 21 04 45 00 6287-66 P co CCGG 152.420 -999.990 ... R4 1993 07 02 11 14 00 76.2470 -119.3533 35.00 30.00 5.00 74606 MBC 1993 05 21 04 45 00 6288-66 P co CCGG 153.430 -999.990 ... R4 1993 07 02 11 30 00 76.2470 -119.3533 35.00 30.00 5.00 74607 MBC 1993 05 23 22 40 00 6617-66 P co CCGG 148.970 -999.990 ... R4 1993 07 02 10 03 00 76.2470 -119.3533 35.00 30.00 5.00 74608 MBC 1993 05 23 22 40 00 6618-66 P co CCGG 148.380 -999.990 ... R4 1993 07 02 10 19 00 76.2470 -119.3533 35.00 30.00 5.00 74609 MBC 1993 05 29 02 50 00 6365-66 P co CCGG 132.340 -999.990 ... R4 1993 07 02 10 36 00 76.2470 -119.3533 35.00 30.00 5.00 74610 MBC 1993 05 29 02 50 00 6366-66 P co CCGG 131.610 -999.990 ... R4 1993 07 02 10 52 00 76.2470 -119.3533 35.00 30.00 5.00 74611 MBC 1993 05 31 04 25 00 6167-66 P co CCGG 128.710 -999.990 ... R4 1993 07 02 13 30 00 76.2470 -119.3533 35.00 30.00 5.00 74612 MBC 1993 05 31 04 25 00 6168-66 P co CCGG 128.710 -999.990 ... R4 1993 07 02 13 46 00 76.2470 -119.3533 35.00 30.00 5.00 74613 MBC 1993 06 03 03 32 00 6413-66 P co CCGG 122.590 -999.990 ... R4 1993 07 02 14 02 00 76.2470 -119.3533 35.00 30.00 5.00 74614 MBC 1993 06 03 03 32 00 6414-66 P co CCGG 122.490 -999.990 ... R4 1993 07 02 14 19 00 76.2470 -119.3533 35.00 30.00 5.00 74615 MBC 1993 06 08 01 20 00 6007-66 P co CCGG 114.480 -999.990 ... R4 1993 07 02 09 31 00 76.2470 -119.3533 35.00 30.00 5.00 74616 MBC 1993 06 08 01 20 00 6008-66 P co CCGG 114.850 -999.990 ... R4 1993 07 02 09 47 00 76.2470 -119.3533 35.00 30.00 5.00 74617 MBC 1993 06 10 05 25 00 6327-66 P co CCGG 109.850 -999.990 ... R4 1993 07 02 08 59 00 76.2470 -119.3533 35.00 30.00 5.00 74618 MBC 1993 06 10 05 25 00 6328-66 P co CCGG 109.790 -999.990 ... R4 1993 07 02 09 15 00 76.2470 -119.3533 35.00 30.00 5.00 74619 MBC 1993 06 17 10 35 00 6771-66 P co CCGG 102.320 -999.990 ... R4 1993 09 21 11 08 00 76.2470 -119.3533 35.00 30.00 5.00 74620 MBC 1993 06 17 10 35 00 6772-66 P co CCGG 102.950 -999.990 ... R4 1993 09 21 11 24 00 76.2470 -119.3533 35.00 30.00 5.00 74621 MBC 1993 06 20 22 30 00 6637-66 P co CCGG 101.870 -999.990 ... R4 1993 09 17 14 09 00 76.2470 -119.3533 35.00 30.00 5.00 74622 MBC 1993 06 20 22 30 00 6638-66 P co CCGG 101.650 -999.990 ... R4 1993 09 17 14 25 00 76.2470 -119.3533 35.00 30.00 5.00 74623 MBC 1993 06 23 22 30 00 6487-66 P co CCGG 96.910 -999.990 ... R4 1993 09 17 14 42 00 76.2470 -119.3533 35.00 30.00 5.00 74624 MBC 1993 06 23 22 30 00 6488-66 P co CCGG 96.480 -999.990 ... R4 1993 09 17 14 58 00 76.2470 -119.3533 35.00 30.00 5.00 74625 MBC 1993 06 27 22 20 00 6619-66 P co CCGG 100.220 -999.990 ... R4 1993 09 21 12 45 00 76.2470 -119.3533 35.00 30.00 5.00 74626 MBC 1993 06 27 22 20 00 6620-66 P co CCGG 100.220 -999.990 ... R4 1993 09 21 13 01 00 76.2470 -119.3533 35.00 30.00 5.00 74627 MBC 1993 06 30 22 35 00 6763-66 P co CCGG 94.160 -999.990 ... R4 1993 09 21 09 19 00 76.2470 -119.3533 35.00 30.00 5.00 74628 MBC 1993 06 30 22 35 00 6764-66 P co CCGG 94.670 -999.990 ... R4 1993 09 21 09 36 00 76.2470 -119.3533 35.00 30.00 5.00 74629 MBC 1993 07 06 03 10 00 6339-66 P co CCGG 90.880 -999.990 ... R4 1993 09 17 12 25 00 76.2470 -119.3533 35.00 30.00 5.00 74630 MBC 1993 07 06 03 10 00 6340-66 P co CCGG 91.310 -999.990 ... R4 1993 09 17 12 41 00 76.2470 -119.3533 35.00 30.00 5.00 74631 MBC 1993 07 08 22 30 00 6353-66 P co CCGG 91.710 -999.990 ... R4 1993 09 17 12 57 00 76.2470 -119.3533 35.00 30.00 5.00 74632 MBC 1993 07 08 22 30 00 6354-66 P co CCGG 90.950 -999.990 ... R4 1993 09 17 13 13 00 76.2470 -119.3533 35.00 30.00 5.00 74633 MBC 1993 07 14 22 20 00 6137-66 P co CCGG 85.950 -999.990 ... R4 1993 08 31 11 05 00 76.2470 -119.3533 35.00 30.00 5.00 74634 MBC 1993 07 14 22 20 00 6138-66 P co CCGG 88.570 -999.990 ... R4 1993 08 31 11 21 00 76.2470 -119.3533 35.00 30.00 5.00 74635 MBC 1993 07 19 10 25 00 6079-66 P co CCGG 86.190 -999.990 ... R4 1993 08 31 11 37 00 76.2470 -119.3533 35.00 30.00 5.00 74636 MBC 1993 07 19 10 25 00 6080-66 P co CCGG 86.260 -999.990 ... R4 1993 08 31 11 54 00 76.2470 -119.3533 35.00 30.00 5.00 74637 MBC 1993 07 21 22 15 00 6313-66 P co CCGG 84.870 -999.990 ... R4 1993 08 31 13 25 00 76.2470 -119.3533 35.00 30.00 5.00 74638 MBC 1993 07 21 22 15 00 6314-66 P co CCGG 85.710 -999.990 ... R4 1993 08 31 13 41 00 76.2470 -119.3533 35.00 30.00 5.00 74639 MBC 1993 07 26 22 25 00 6397-66 P co CCGG 87.630 -999.990 ... R4 1993 08 31 15 03 00 76.2470 -119.3533 35.00 30.00 5.00 74640 MBC 1993 07 26 22 25 00 6398-66 P co CCGG 86.900 -999.990 ... R4 1993 08 31 15 19 00 76.2470 -119.3533 35.00 30.00 5.00 74641 MBC 1993 07 30 14 10 00 6691-66 P co CCGG 87.080 -999.990 ... R4 1993 08 31 13 58 00 76.2470 -119.3533 35.00 30.00 5.00 74642 MBC 1993 07 30 14 10 00 6692-66 P co CCGG 88.440 -999.990 ... R4 1993 08 31 14 14 00 76.2470 -119.3533 35.00 30.00 5.00 74643 MBC 1993 08 07 22 30 00 6677-66 P co CCGG 82.950 -999.990 ... R4 1993 08 31 14 30 00 76.2470 -119.3533 35.00 30.00 5.00 74644 MBC 1993 08 07 22 30 00 6678-66 P co CCGG 83.290 -999.990 ... R4 1993 08 31 14 47 00 76.2470 -119.3533 35.00 30.00 5.00 74645 MBC 1993 08 11 10 30 00 6925-66 P co CCGG 88.930 -999.990 ... R4 1993 08 31 12 43 00 76.2470 -119.3533 35.00 30.00 5.00 74646 MBC 1993 08 11 10 30 00 6926-66 P co CCGG 90.310 -999.990 ... R4 1993 08 31 12 59 00 76.2470 -119.3533 35.00 30.00 5.00 74647 MBC 1993 08 19 02 20 00 6083-66 P co CCGG 84.740 -999.990 ... R4 1993 08 31 12 10 00 76.2470 -119.3533 35.00 30.00 5.00 74648 MBC 1993 08 19 02 20 00 6084-66 P co CCGG 85.310 -999.990 ... R4 1993 08 31 12 26 00 76.2470 -119.3533 35.00 30.00 5.00 74649 MBC 1993 08 23 02 10 00 6571-66 P co CCGG 96.060 -999.990 ... R4 1993 10 25 11 56 00 76.2470 -119.3533 35.00 30.00 5.00 74650 MBC 1993 08 23 02 10 00 6572-66 P co CCGG 96.320 -999.990 ... R4 1993 10 25 12 12 00 76.2470 -119.3533 35.00 30.00 5.00 74651 MBC 1993 08 25 22 20 00 6591-66 P co CCGG 97.690 -999.990 ... R4 1993 10 25 11 30 00 76.2470 -119.3533 35.00 30.00 5.00 74652 MBC 1993 08 25 22 20 00 6592-66 P co CCGG 98.290 -999.990 ... R4 1993 10 25 12 45 00 76.2470 -119.3533 35.00 30.00 5.00 74653 MBC 1993 08 29 22 20 00 6703-66 P co CCGG 95.770 -999.990 ... R4 1993 10 26 14 59 00 76.2470 -119.3533 35.00 30.00 5.00 74654 MBC 1993 08 29 22 20 00 6704-66 P co CCGG 96.590 -999.990 ... R4 1993 10 26 15 15 00 76.2470 -119.3533 35.00 30.00 5.00 74655 MBC 1993 09 02 02 35 00 6179-66 P co CCGG 96.390 -999.990 ... R4 1993 10 26 11 22 00 76.2470 -119.3533 35.00 30.00 5.00 74656 MBC 1993 09 02 02 35 00 6180-66 P co CCGG 96.080 -999.990 ... R4 1993 10 26 11 39 00 76.2470 -119.3533 35.00 30.00 5.00 74657 MBC 1993 09 06 01 35 00 6011-66 P co CCGG 108.370 -999.990 ... R4 1993 10 25 14 50 00 76.2470 -119.3533 35.00 30.00 5.00 74658 MBC 1993 09 06 01 35 00 6012-66 P co CCGG 107.760 -999.990 ... R4 1993 10 25 15 06 00 76.2470 -119.3533 35.00 30.00 5.00 74659 MBC 1993 09 08 22 20 00 6465-66 P co CCGG 109.910 -999.990 ... R4 1993 10 26 10 50 00 76.2470 -119.3533 35.00 30.00 5.00 74660 MBC 1993 09 08 22 20 00 6466-66 P co CCGG 109.640 -999.990 ... R4 1993 10 26 11 06 00 76.2470 -119.3533 35.00 30.00 5.00 74661 MBC 1993 09 15 22 30 00 6477-66 P co CCGG 116.400 -999.990 ... R4 1993 10 26 14 26 00 76.2470 -119.3533 35.00 30.00 5.00 74662 MBC 1993 09 15 22 30 00 6478-66 P co CCGG 114.630 -999.990 ... R4 1993 10 26 14 43 00 76.2470 -119.3533 35.00 30.00 5.00 74663 MBC 1993 09 25 02 10 00 6693-66 P co CCGG 113.120 -999.990 ... R4 1993 10 26 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74664 MBC 1993 09 25 02 10 00 6694-66 P co CCGG 113.450 -999.990 ... R4 1993 10 26 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74665 MBC 1993 09 30 02 10 00 6071-66 P co CCGG 113.110 -999.990 ... R4 1993 11 23 14 22 00 76.2470 -119.3533 35.00 30.00 5.00 74666 MBC 1993 09 30 02 10 00 6072-66 P co CCGG 112.670 -999.990 ... R4 1993 11 23 14 38 00 76.2470 -119.3533 35.00 30.00 5.00 74667 MBC 1993 10 04 17 15 00 6699-66 P co CCGG 110.220 -999.990 ... R4 1993 11 23 14 54 00 76.2470 -119.3533 35.00 30.00 5.00 74668 MBC 1993 10 04 17 15 00 6700-66 P co CCGG 111.720 -999.990 ... R4 1993 11 23 15 10 00 76.2470 -119.3533 35.00 30.00 5.00 74669 MBC 1993 10 07 23 15 00 6405-66 P co CCGG 112.930 -999.990 ... R4 1993 11 24 11 57 00 76.2470 -119.3533 35.00 30.00 5.00 74670 MBC 1993 10 07 23 15 00 6406-66 P co CCGG 112.590 -999.990 ... R4 1993 11 24 12 13 00 76.2470 -119.3533 35.00 30.00 5.00 74671 MBC 1993 10 12 22 45 00 6907-66 P co CCGG 109.300 -999.990 ... R4 1993 11 24 12 29 00 76.2470 -119.3533 35.00 30.00 5.00 74672 MBC 1993 10 12 22 45 00 6908-66 P co CCGG 110.060 -999.990 ... R4 1993 11 24 12 45 00 76.2470 -119.3533 35.00 30.00 5.00 74673 MBC 1993 10 14 00 05 00 6430-66 P co CCGG 109.780 -999.990 ... R4 1993 11 24 10 05 00 76.2470 -119.3533 35.00 30.00 5.00 74674 MBC 1993 10 18 22 40 00 6063-66 P co CCGG 118.080 -999.990 ... R4 1993 11 23 13 50 00 76.2470 -119.3533 35.00 30.00 5.00 74675 MBC 1993 10 18 22 40 00 6064-66 P co CCGG 115.780 -999.990 ... R4 1993 11 23 14 06 00 76.2470 -119.3533 35.00 30.00 5.00 74676 MBC 1993 10 21 22 48 00 6421-66 P co CCGG 116.610 -999.990 ... R4 1993 12 03 09 39 00 76.2470 -119.3533 35.00 30.00 5.00 74677 MBC 1993 10 24 22 45 00 6741-66 P co CCGG 117.970 -999.990 ... R4 1993 11 24 08 10 00 76.2470 -119.3533 35.00 30.00 5.00 74678 MBC 1993 10 24 22 45 00 6742-66 P co CCGG 118.550 -999.990 ... R4 1993 11 24 08 26 00 76.2470 -119.3533 35.00 30.00 5.00 74679 MBC 1993 10 28 22 46 00 6263-66 P co CCGG 116.780 -999.990 ... R4 1993 12 16 09 58 00 76.2470 -119.3533 35.00 30.00 5.00 74680 MBC 1993 10 28 22 46 00 6264-66 P co CCGG 117.270 -999.990 ... R4 1993 12 16 10 14 00 76.2470 -119.3533 35.00 30.00 5.00 74681 MBC 1993 10 31 22 51 00 6877-66 P co CCGG 117.420 -999.990 ... R4 1993 12 16 10 30 00 76.2470 -119.3533 35.00 30.00 5.00 74682 MBC 1993 10 31 22 51 00 6878-66 P co CCGG 117.610 -999.990 ... R4 1993 12 16 10 46 00 76.2470 -119.3533 35.00 30.00 5.00 74683 MBC 1993 11 03 22 50 00 6375-66 P co CCGG 122.240 -999.990 ... R4 1993 12 16 08 53 00 76.2470 -119.3533 35.00 30.00 5.00 74684 MBC 1993 11 03 22 50 00 6376-66 P co CCGG 122.220 -999.990 ... R4 1993 12 16 09 09 00 76.2470 -119.3533 35.00 30.00 5.00 74685 MBC 1993 11 11 22 50 00 6222-66 P co CCGG 138.650 -999.990 ... R4 1993 12 16 09 42 00 76.2470 -119.3533 35.00 30.00 5.00 74686 MBC 1993 11 12 22 35 00 6377-66 P co CCGG 136.290 -999.990 ... R4 1993 12 15 11 34 00 76.2470 -119.3533 35.00 30.00 5.00 74687 MBC 1993 11 12 22 35 00 6378-66 P co CCGG 136.980 -999.990 ... R4 1993 12 15 11 50 00 76.2470 -119.3533 35.00 30.00 5.00 74688 MBC 1993 11 14 22 42 00 6917-66 P co CCGG 131.040 -999.990 ... R4 1993 12 15 11 01 00 76.2470 -119.3533 35.00 30.00 5.00 74689 MBC 1993 11 14 22 42 00 6918-66 P co CCGG 130.520 -999.990 ... R4 1993 12 15 11 17 00 76.2470 -119.3533 35.00 30.00 5.00 74690 MBC 1993 11 17 22 31 00 6399-66 P co CCGG 129.400 -999.990 ... R4 1993 12 15 12 39 00 76.2470 -119.3533 35.00 30.00 5.00 74691 MBC 1993 11 17 22 31 00 6400-66 P co CCGG 128.910 -999.990 ... R4 1993 12 15 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 74692 MBC 1993 11 21 22 50 00 6271-66 P co CCGG 138.090 -999.990 ... R4 1993 12 15 12 06 00 76.2470 -119.3533 35.00 30.00 5.00 74693 MBC 1993 11 21 22 50 00 6272-66 P co CCGG 138.640 -999.990 ... R4 1993 12 15 12 22 00 76.2470 -119.3533 35.00 30.00 5.00 74694 MBC 1993 12 01 16 30 00 6389-66 P co CCGG 150.990 -999.990 ... R4 1994 01 26 13 30 00 76.2470 -119.3533 35.00 30.00 5.00 74695 MBC 1993 12 01 16 30 00 6390-66 P co CCGG 149.830 -999.990 ... R4 1994 01 26 13 46 00 76.2470 -119.3533 35.00 30.00 5.00 74696 MBC 1993 12 05 14 15 00 6745-66 P co CCGG 142.260 -999.990 ... R4 1994 01 26 10 19 00 76.2470 -119.3533 35.00 30.00 5.00 74697 MBC 1993 12 05 14 15 00 6746-66 P co CCGG 141.640 -999.990 ... R4 1994 01 26 10 35 00 76.2470 -119.3533 35.00 30.00 5.00 74698 MBC 1993 12 09 03 20 00 6061-66 P co CCGG 141.360 -999.990 ... R4 1994 01 25 14 15 00 76.2470 -119.3533 35.00 30.00 5.00 74699 MBC 1993 12 09 03 20 00 6062-66 P co CCGG 140.710 -999.990 ... R4 1994 01 25 14 31 00 76.2470 -119.3533 35.00 30.00 5.00 74700 MBC 1993 12 12 14 30 00 6013-66 P co CCGG 140.160 -999.990 ... R4 1994 01 25 14 47 00 76.2470 -119.3533 35.00 30.00 5.00 74701 MBC 1993 12 12 14 30 00 6014-66 P co CCGG 140.310 -999.990 ... R4 1994 01 25 15 03 00 76.2470 -119.3533 35.00 30.00 5.00 74702 MBC 1993 12 15 14 00 00 6571-66 P co CCGG 144.610 -999.990 ... R4 1994 01 26 09 47 00 76.2470 -119.3533 35.00 30.00 5.00 74703 MBC 1993 12 15 14 00 00 6572-66 P co CCGG 145.440 -999.990 ... R4 1994 01 26 10 03 00 76.2470 -119.3533 35.00 30.00 5.00 74704 MBC 1993 12 23 23 10 00 6553-66 P co CCGG 152.750 -999.990 ... R4 1994 01 25 15 56 00 76.2470 -119.3533 35.00 30.00 5.00 74705 MBC 1993 12 23 23 10 00 6554-66 P co CCGG 153.800 -999.990 ... R4 1994 01 25 16 12 00 76.2470 -119.3533 35.00 30.00 5.00 74706 MBC 1993 12 26 23 05 00 6705-66 P co CCGG 150.510 -999.990 ... R4 1994 01 25 15 20 00 76.2470 -119.3533 35.00 30.00 5.00 74707 MBC 1993 12 26 23 05 00 6706-66 P co CCGG 151.130 -999.990 ... R4 1994 01 25 15 36 00 76.2470 -119.3533 35.00 30.00 5.00 74708 MBC 1993 12 31 11 00 00 6345-66 P co CCGG 155.040 -999.990 ... R4 1994 01 25 13 42 00 76.2470 -119.3533 35.00 30.00 5.00 74709 MBC 1993 12 31 11 00 00 6346-66 P co CCGG 155.150 -999.990 ... R4 1994 01 25 13 59 00 76.2470 -119.3533 35.00 30.00 5.00 74710 MBC 1994 01 03 02 10 00 6259-66 P co CCGG 156.100 -999.990 ... R4 1994 03 03 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 74711 MBC 1994 01 03 02 10 00 6260-66 P co CCGG 157.480 -999.990 ... R4 1994 03 03 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 74712 MBC 1994 01 06 10 30 00 6115-66 P co CCGG 194.500 -999.990 .X. R4 1994 03 03 11 51 00 76.2470 -119.3533 35.00 30.00 5.00 74713 MBC 1994 01 06 10 30 00 6116-66 P co CCGG 192.220 -999.990 .X. R4 1994 03 03 12 08 00 76.2470 -119.3533 35.00 30.00 5.00 74714 MBC 1994 01 09 23 00 00 6370-66 P co CCGG 166.060 -999.990 ... R4 1994 03 03 10 14 00 76.2470 -119.3533 35.00 30.00 5.00 74715 MBC 1994 01 12 11 10 00 6267-66 P co CCGG 162.860 -999.990 ... R4 1994 03 03 08 14 00 76.2470 -119.3533 35.00 30.00 5.00 74716 MBC 1994 01 12 11 10 00 6268-66 P co CCGG 162.780 -999.990 ... R4 1994 03 03 08 30 00 76.2470 -119.3533 35.00 30.00 5.00 74717 MBC 1994 01 19 11 00 00 6155-66 P co CCGG 171.230 -999.990 P.. R4 1994 03 03 09 25 00 76.2470 -119.3533 35.00 30.00 5.00 74718 MBC 1994 01 19 11 00 00 6156-66 P co CCGG 174.590 -999.990 P.. R4 1994 03 03 09 41 00 76.2470 -119.3533 35.00 30.00 5.00 74719 MBC 1994 01 23 23 05 00 6687-66 P co CCGG 207.810 -999.990 .X. R4 1994 03 03 08 52 00 76.2470 -119.3533 35.00 30.00 5.00 74720 MBC 1994 01 23 23 05 00 6688-66 P co CCGG 207.940 -999.990 .X. R4 1994 03 03 09 09 00 76.2470 -119.3533 35.00 30.00 5.00 74721 MBC 1994 01 27 13 10 00 6275-66 P co CCGG 176.640 -999.990 ... R4 1994 03 03 07 42 00 76.2470 -119.3533 35.00 30.00 5.00 74722 MBC 1994 01 27 13 10 00 6276-66 P co CCGG 177.000 -999.990 ... R4 1994 03 03 07 58 00 76.2470 -119.3533 35.00 30.00 5.00 74723 MBC 1994 01 30 14 30 00 6303-66 P co CCGG 184.700 -999.990 ... R4 1994 03 03 09 57 00 76.2470 -119.3533 35.00 30.00 5.00 74724 MBC 1994 02 04 01 10 00 6195-66 P co CCGG 173.810 -999.990 ... R4 1994 04 19 10 29 00 76.2470 -119.3533 35.00 30.00 5.00 74726 MBC 1994 02 04 01 10 00 6196-66 P co CCGG 173.920 -999.990 ... R4 1994 04 19 10 45 00 76.2470 -119.3533 35.00 30.00 5.00 74727 MBC 1994 02 07 14 45 00 6797-66 P co CCGG 179.240 -999.990 ... R4 1994 04 19 08 52 00 76.2470 -119.3533 35.00 30.00 5.00 74728 MBC 1994 02 07 14 45 00 6798-66 P co CCGG 179.090 -999.990 ... R4 1994 04 19 09 08 00 76.2470 -119.3533 35.00 30.00 5.00 74729 MBC 1994 02 11 11 00 00 6905-66 P co CCGG 184.510 -999.990 ... R4 1994 04 18 13 10 00 76.2470 -119.3533 35.00 30.00 5.00 74730 MBC 1994 02 11 11 00 00 6906-66 P co CCGG 184.690 -999.990 ... R4 1994 04 18 13 26 00 76.2470 -119.3533 35.00 30.00 5.00 74731 MBC 1994 02 13 23 00 00 6449-66 P co CCGG 167.330 -999.990 ... R4 1994 04 18 13 42 00 76.2470 -119.3533 35.00 30.00 5.00 74732 MBC 1994 02 13 23 00 00 6450-66 P co CCGG 166.480 -999.990 ... R4 1994 04 18 13 58 00 76.2470 -119.3533 35.00 30.00 5.00 74733 MBC 1994 02 18 11 00 00 6903-66 P co CCGG 173.560 -999.990 ... R4 1994 04 18 08 59 00 76.2470 -119.3533 35.00 30.00 5.00 74734 MBC 1994 02 18 11 00 00 6904-66 P co CCGG 172.120 -999.990 ... R4 1994 04 18 09 15 00 76.2470 -119.3533 35.00 30.00 5.00 74735 MBC 1994 02 20 14 00 00 6445-66 P co CCGG 241.930 -999.990 .XC R4 1994 04 18 09 31 00 76.2470 -119.3533 35.00 30.00 5.00 74736 MBC 1994 02 20 14 00 00 6446-66 P co CCGG 240.240 -999.990 .XC R4 1994 04 18 09 48 00 76.2470 -119.3533 35.00 30.00 5.00 74737 MBC 1994 02 26 01 35 00 6033-66 P co CCGG 206.250 -999.990 ... R4 1994 04 19 08 29 00 76.2470 -119.3533 35.00 30.00 5.00 74738 MBC 1994 02 28 13 00 00 6099-66 P co CCGG 221.040 -999.990 .X. R4 1994 04 19 09 24 00 76.2470 -119.3533 35.00 30.00 5.00 74739 MBC 1994 02 28 13 00 00 6100-66 P co CCGG 220.180 -999.990 .X. R4 1994 04 19 09 40 00 76.2470 -119.3533 35.00 30.00 5.00 74740 MBC 1994 03 04 21 50 00 6497-66 P co CCGG 204.160 -999.990 P.. R4 1994 05 12 09 42 00 76.2470 -119.3533 35.00 30.00 5.00 74741 MBC 1994 03 04 21 50 00 6498-66 P co CCGG 200.500 -999.990 P.. R4 1994 05 12 09 58 00 76.2470 -119.3533 35.00 30.00 5.00 74742 MBC 1994 03 07 13 30 00 6809-66 P co CCGG 221.080 -999.990 .X. R4 1994 05 12 10 14 00 76.2470 -119.3533 35.00 30.00 5.00 74743 MBC 1994 03 07 13 30 00 6810-66 P co CCGG 221.550 -999.990 .X. R4 1994 05 12 10 31 00 76.2470 -119.3533 35.00 30.00 5.00 74744 MBC 1994 03 19 21 15 00 6593-66 P co CCGG 197.880 -999.990 ... R4 1994 05 16 15 36 00 76.2470 -119.3533 35.00 30.00 5.00 74745 MBC 1994 03 19 21 15 00 6594-66 P co CCGG 200.230 -999.990 ... R4 1994 05 16 15 52 00 76.2470 -119.3533 35.00 30.00 5.00 74746 MBC 1994 03 23 13 25 00 6855-66 P co CCGG 200.490 -999.990 ... R4 1994 05 16 15 03 00 76.2470 -119.3533 35.00 30.00 5.00 74747 MBC 1994 03 23 13 25 00 6856-66 P co CCGG 202.550 -999.990 ... R4 1994 05 16 15 19 00 76.2470 -119.3533 35.00 30.00 5.00 74748 MBC 1994 03 28 02 00 00 6521-66 P co CCGG 196.100 -999.990 ... R4 1994 05 16 13 19 00 76.2470 -119.3533 35.00 30.00 5.00 74749 MBC 1994 03 28 02 00 00 6522-66 P co CCGG 194.580 -999.990 ... R4 1994 05 16 13 35 00 76.2470 -119.3533 35.00 30.00 5.00 74750 MBC 1994 04 03 15 30 00 6256-66 P co CCGG 189.750 -999.990 ... R4 1994 05 16 13 03 00 76.2470 -119.3533 35.00 30.00 5.00 74752 MBC 1994 04 08 02 45 00 6871-66 P co CCGG 192.870 -999.990 ... R4 1994 05 12 09 10 00 76.2470 -119.3533 35.00 30.00 5.00 74753 MBC 1994 04 08 02 45 00 6872-66 P co CCGG 194.280 -999.990 ... R4 1994 05 12 09 26 00 76.2470 -119.3533 35.00 30.00 5.00 74754 MBC 1994 04 11 04 15 00 6707-66 P co CCGG 190.780 -999.990 ... R4 1994 05 12 08 37 00 76.2470 -119.3533 35.00 30.00 5.00 74755 MBC 1994 04 11 04 15 00 6708-66 P co CCGG 191.690 -999.990 ... R4 1994 05 12 08 53 00 76.2470 -119.3533 35.00 30.00 5.00 74756 MBC 1994 04 14 11 00 00 6711-66 P co CCGG 192.120 -999.990 P.. R4 1994 06 02 09 06 00 76.2470 -119.3533 35.00 30.00 5.00 74757 MBC 1994 04 14 11 00 00 6712-66 P co CCGG 195.040 -999.990 P.. R4 1994 06 02 09 22 00 76.2470 -119.3533 35.00 30.00 5.00 74758 MBC 1994 04 17 14 30 00 6119-66 P co CCGG 191.800 -999.990 ... R4 1994 06 02 10 10 00 76.2470 -119.3533 35.00 30.00 5.00 74759 MBC 1994 04 17 14 30 00 6120-66 P co CCGG 190.470 -999.990 ... R4 1994 06 02 10 27 00 76.2470 -119.3533 35.00 30.00 5.00 74760 MBC 1994 04 21 15 25 00 6539-66 P co CCGG 187.790 -999.990 ... R4 1994 06 01 15 18 00 76.2470 -119.3533 35.00 30.00 5.00 74761 MBC 1994 04 21 15 25 00 6540-66 P co CCGG 188.260 -999.990 ... R4 1994 06 01 15 34 00 76.2470 -119.3533 35.00 30.00 5.00 74762 MBC 1994 04 25 02 55 00 6605-66 P co CCGG 179.600 -999.990 ... R4 1994 06 02 10 43 00 76.2470 -119.3533 35.00 30.00 5.00 74763 MBC 1994 04 25 02 55 00 6606-66 P co CCGG 177.900 -999.990 ... R4 1994 06 02 10 59 00 76.2470 -119.3533 35.00 30.00 5.00 74764 MBC 1994 04 28 14 10 00 6087-66 P co CCGG 165.700 -999.990 ... R4 1994 06 02 12 26 00 76.2470 -119.3533 35.00 30.00 5.00 74765 MBC 1994 04 28 14 10 00 6088-66 P co CCGG 166.200 -999.990 ... R4 1994 06 02 12 42 00 76.2470 -119.3533 35.00 30.00 5.00 74766 MBC 1994 05 02 11 10 00 6879-66 P co CCGG 164.470 -999.990 ... R4 1994 06 02 12 58 00 76.2470 -119.3533 35.00 30.00 5.00 74767 MBC 1994 05 02 11 10 00 6880-66 P co CCGG 165.360 -999.990 ... R4 1994 06 02 13 14 00 76.2470 -119.3533 35.00 30.00 5.00 74768 MBC 1994 05 05 23 20 00 6237-66 P co CCGG 173.520 -999.990 ... R4 1994 06 02 09 38 00 76.2470 -119.3533 35.00 30.00 5.00 74769 MBC 1994 05 05 23 20 00 6238-66 P co CCGG 171.030 -999.990 ... R4 1994 06 02 09 54 00 76.2470 -119.3533 35.00 30.00 5.00 74770 MBC 1994 05 08 12 20 00 6865-66 P co CCGG 173.210 -999.990 ... R4 1994 06 02 11 21 00 76.2470 -119.3533 35.00 30.00 5.00 74771 MBC 1994 05 08 12 20 00 6866-66 P co CCGG 173.280 -999.990 ... R4 1994 06 02 11 37 00 76.2470 -119.3533 35.00 30.00 5.00 74772 MBC 1994 05 12 10 45 00 6327-66 P co CCGG 164.890 -999.990 ... R4 1994 06 27 10 24 00 76.2470 -119.3533 35.00 30.00 5.00 74773 MBC 1994 05 12 10 45 00 6328-66 P co CCGG 166.200 -999.990 ... R4 1994 06 27 10 40 00 76.2470 -119.3533 35.00 30.00 5.00 74774 MBC 1994 05 16 23 15 00 6367-66 P co CCGG 161.780 -999.990 ... R4 1994 06 27 09 51 00 76.2470 -119.3533 35.00 30.00 5.00 74775 MBC 1994 05 16 23 15 00 6368-66 P co CCGG 160.560 -999.990 ... R4 1994 06 27 10 07 00 76.2470 -119.3533 35.00 30.00 5.00 74776 MBC 1994 05 20 11 30 00 6045-66 P co CCGG 153.400 -999.990 ... R4 1994 06 27 08 46 00 76.2470 -119.3533 35.00 30.00 5.00 74777 MBC 1994 05 20 11 30 00 6046-66 P co CCGG 153.720 -999.990 ... R4 1994 06 27 09 02 00 76.2470 -119.3533 35.00 30.00 5.00 74778 MBC 1994 05 23 11 10 00 6329-66 P co CCGG 147.280 -999.990 ... R4 1994 06 24 14 53 00 76.2470 -119.3533 35.00 30.00 5.00 74779 MBC 1994 05 23 11 10 00 6330-66 P co CCGG 148.180 -999.990 ... R4 1994 06 24 15 10 00 76.2470 -119.3533 35.00 30.00 5.00 74780 MBC 1994 05 26 11 15 00 6301-66 P co CCGG 143.290 -999.990 ... R4 1994 06 23 16 34 00 76.2470 -119.3533 35.00 30.00 5.00 74781 MBC 1994 05 26 11 15 00 6302-66 P co CCGG 144.740 -999.990 ... R4 1994 06 23 16 50 00 76.2470 -119.3533 35.00 30.00 5.00 74782 MBC 1994 05 30 23 30 00 6755-66 P co CCGG 133.430 -999.990 ... R4 1994 06 24 08 35 00 76.2470 -119.3533 35.00 30.00 5.00 74783 MBC 1994 05 30 23 30 00 6756-66 P co CCGG 132.960 -999.990 ... R4 1994 06 24 08 51 00 76.2470 -119.3533 35.00 30.00 5.00 74784 MBC 1994 06 02 23 10 00 6815-66 P co CCGG 131.860 -999.990 ... R4 1994 06 23 14 38 00 76.2470 -119.3533 35.00 30.00 5.00 74785 MBC 1994 06 02 23 10 00 6816-66 P co CCGG 131.670 -999.990 ... R4 1994 06 23 14 55 00 76.2470 -119.3533 35.00 30.00 5.00 74786 MBC 1994 06 05 12 35 00 6249-66 P co CCGG 132.330 -999.990 ... R4 1994 06 23 15 11 00 76.2470 -119.3533 35.00 30.00 5.00 74787 MBC 1994 06 05 12 35 00 6250-66 P co CCGG 132.280 -999.990 ... R4 1994 06 23 15 27 00 76.2470 -119.3533 35.00 30.00 5.00 74788 MBC 1994 06 11 22 50 00 6387-66 P co CCGG 124.750 -999.990 ... R4 1994 07 20 12 00 00 76.2470 -119.3533 35.00 30.00 5.00 74789 MBC 1994 06 11 22 50 00 6388-66 P co CCGG 124.360 -999.990 ... R4 1994 07 20 12 16 00 76.2470 -119.3533 35.00 30.00 5.00 74790 MBC 1994 06 16 14 40 00 6421-66 P co CCGG 120.400 -999.990 ... R4 1994 07 20 13 37 00 76.2470 -119.3533 35.00 30.00 5.00 74791 MBC 1994 06 16 14 40 00 6422-66 P co CCGG 119.730 -999.990 ... R4 1994 07 20 13 53 00 76.2470 -119.3533 35.00 30.00 5.00 74792 MBC 1994 06 19 14 45 00 6519-66 P co CCGG 116.380 -999.990 ... R4 1994 07 20 08 59 00 76.2470 -119.3533 35.00 30.00 5.00 74793 MBC 1994 06 19 14 45 00 6520-66 P co CCGG 115.460 -999.990 ... R4 1994 07 20 09 15 00 76.2470 -119.3533 35.00 30.00 5.00 74794 MBC 1994 06 23 10 40 00 6103-66 P co CCGG 103.380 -999.990 ... R4 1994 07 20 08 27 00 76.2470 -119.3533 35.00 30.00 5.00 74795 MBC 1994 06 23 10 40 00 6104-66 P co CCGG 103.540 -999.990 ... R4 1994 07 20 08 43 00 76.2470 -119.3533 35.00 30.00 5.00 74796 MBC 1994 06 26 23 25 00 6211-66 P co CCGG 107.340 -999.990 ... R4 1994 07 20 10 43 00 76.2470 -119.3533 35.00 30.00 5.00 74797 MBC 1994 06 26 23 25 00 6212-66 P co CCGG 106.830 -999.990 ... R4 1994 07 20 10 59 00 76.2470 -119.3533 35.00 30.00 5.00 74798 MBC 1994 07 01 11 05 00 6339-66 P co CCGG 100.020 -999.990 ... R4 1994 07 20 09 32 00 76.2470 -119.3533 35.00 30.00 5.00 74799 MBC 1994 07 01 11 05 00 6340-66 P co CCGG 99.560 -999.990 ... R4 1994 07 20 09 48 00 76.2470 -119.3533 35.00 30.00 5.00 74800 MBC 1994 07 04 02 10 00 6005-66 P co CCGG 95.460 -999.990 ... R4 1994 07 20 12 32 00 76.2470 -119.3533 35.00 30.00 5.00 74801 MBC 1994 07 04 02 10 00 6006-66 P co CCGG 96.540 -999.990 ... R4 1994 07 20 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 74802 MBC 1994 07 07 10 50 00 6307-66 P co CCGG 98.410 -999.990 ... R4 1994 07 20 13 05 00 76.2470 -119.3533 35.00 30.00 5.00 74803 MBC 1994 07 07 10 50 00 6308-66 P co CCGG 98.030 -999.990 ... R4 1994 07 20 13 21 00 76.2470 -119.3533 35.00 30.00 5.00 74804 MBC 1994 07 10 23 05 00 6177-66 P co CCGG 220.210 -999.990 .N. R4 1994 09 12 10 35 00 76.2470 -119.3533 35.00 30.00 5.00 74805 MBC 1994 07 10 23 05 00 6178-66 P co CCGG 219.110 -999.990 .N. R4 1994 09 12 10 51 00 76.2470 -119.3533 35.00 30.00 5.00 74806 MBC 1994 07 15 02 10 00 6263-66 P co CCGG 93.910 -999.990 ... R4 1994 09 12 08 47 00 76.2470 -119.3533 35.00 30.00 5.00 74807 MBC 1994 07 15 02 10 00 6264-66 P co CCGG 93.680 -999.990 ... R4 1994 09 12 09 04 00 76.2470 -119.3533 35.00 30.00 5.00 74808 MBC 1994 07 17 23 00 00 6623-66 P co CCGG 94.200 -999.990 ... R4 1994 09 12 12 54 00 76.2470 -119.3533 35.00 30.00 5.00 74809 MBC 1994 07 17 23 00 00 6624-66 P co CCGG 94.720 -999.990 ... R4 1994 09 12 13 11 00 76.2470 -119.3533 35.00 30.00 5.00 74810 MBC 1994 07 22 02 05 00 6385-66 P co CCGG 133.560 -999.990 P.. R4 1994 09 12 11 48 00 76.2470 -119.3533 35.00 30.00 5.00 74811 MBC 1994 07 22 02 05 00 6386-66 P co CCGG 152.250 -999.990 P.. R4 1994 09 12 12 05 00 76.2470 -119.3533 35.00 30.00 5.00 74812 MBC 1994 07 25 02 25 00 6111-66 P co CCGG 86.620 -999.990 ... R4 1994 09 12 11 07 00 76.2470 -119.3533 35.00 30.00 5.00 74813 MBC 1994 07 25 02 25 00 6112-66 P co CCGG 85.920 -999.990 ... R4 1994 09 12 11 24 00 76.2470 -119.3533 35.00 30.00 5.00 74814 MBC 1994 07 30 22 55 00 6827-66 P co CCGG 92.940 -999.990 ... R4 1994 09 12 13 27 00 76.2470 -119.3533 35.00 30.00 5.00 74815 MBC 1994 07 30 22 55 00 6828-66 P co CCGG 93.750 -999.990 ... R4 1994 09 12 13 43 00 76.2470 -119.3533 35.00 30.00 5.00 74816 MBC 1994 08 02 02 40 00 6261-66 P co CCGG 90.530 -999.990 P.. R4 1994 09 12 12 21 00 76.2470 -119.3533 35.00 30.00 5.00 74817 MBC 1994 08 02 02 40 00 6262-66 P co CCGG 128.360 -999.990 P.. R4 1994 09 12 12 38 00 76.2470 -119.3533 35.00 30.00 5.00 74818 MBC 1994 08 05 14 15 00 6906-66 P co CCGG 98.030 -999.990 ... R4 1994 09 12 14 10 00 76.2470 -119.3533 35.00 30.00 5.00 74820 MBC 1994 08 09 01 45 00 6463-66 P co CCGG 103.490 -999.990 ... R4 1994 09 22 14 27 00 76.2470 -119.3533 35.00 30.00 5.00 74821 MBC 1994 08 09 01 45 00 6464-66 P co CCGG 102.860 -999.990 ... R4 1994 09 22 14 43 00 76.2470 -119.3533 35.00 30.00 5.00 74822 MBC 1994 08 12 14 00 00 6481-66 P co CCGG 91.130 -999.990 ... R4 1994 09 22 13 54 00 76.2470 -119.3533 35.00 30.00 5.00 74823 MBC 1994 08 12 14 00 00 6482-66 P co CCGG 91.130 -999.990 ... R4 1994 09 22 14 11 00 76.2470 -119.3533 35.00 30.00 5.00 74824 MBC 1994 08 16 23 05 00 6099-66 P co CCGG 107.480 -999.990 ... R4 1994 09 22 15 00 00 76.2470 -119.3533 35.00 30.00 5.00 74825 MBC 1994 08 16 23 05 00 6100-66 P co CCGG 107.430 -999.990 ... R4 1994 09 22 15 16 00 76.2470 -119.3533 35.00 30.00 5.00 74826 MBC 1994 08 19 11 05 00 6125-66 P co CCGG 96.030 -999.990 ... R4 1994 09 22 13 22 00 76.2470 -119.3533 35.00 30.00 5.00 74827 MBC 1994 08 19 11 05 00 6126-66 P co CCGG 95.590 -999.990 ... R4 1994 09 22 13 38 00 76.2470 -119.3533 35.00 30.00 5.00 74828 MBC 1994 08 23 23 07 00 6763-66 P co CCGG 100.570 -999.990 P.. R4 1994 09 27 12 06 00 76.2470 -119.3533 35.00 30.00 5.00 74829 MBC 1994 08 23 23 07 00 6764-66 P co CCGG 95.350 -999.990 P.. R4 1994 09 27 12 22 00 76.2470 -119.3533 35.00 30.00 5.00 74830 MBC 1994 08 26 23 10 00 6589-66 P co CCGG 94.330 -999.990 ... R4 1994 09 27 11 00 00 76.2470 -119.3533 35.00 30.00 5.00 74831 MBC 1994 08 26 23 10 00 6590-66 P co CCGG 93.730 -999.990 ... R4 1994 09 27 11 16 00 76.2470 -119.3533 35.00 30.00 5.00 74832 MBC 1994 08 29 23 05 00 6737-66 P co CCGG 103.140 -999.990 ... R4 1994 09 22 15 35 00 76.2470 -119.3533 35.00 30.00 5.00 74833 MBC 1994 08 29 23 05 00 6738-66 P co CCGG 102.610 -999.990 ... R4 1994 09 22 15 52 00 76.2470 -119.3533 35.00 30.00 5.00 74834 MBC 1994 09 02 10 45 00 6795-66 P co CCGG 102.150 -999.990 ... R4 1994 09 27 12 38 00 76.2470 -119.3533 35.00 30.00 5.00 74835 MBC 1994 09 02 10 45 00 6796-66 P co CCGG 100.220 -999.990 ... R4 1994 09 27 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 74836 MBC 1994 09 05 14 25 00 6693-66 P co CCGG 112.050 -999.990 ... R4 1994 10 26 12 01 00 76.2470 -119.3533 35.00 30.00 5.00 74837 MBC 1994 09 05 14 25 00 6694-66 P co CCGG 109.910 -999.990 ... R4 1994 10 26 12 17 00 76.2470 -119.3533 35.00 30.00 5.00 74838 MBC 1994 09 08 22 55 00 6687-66 P co CCGG 106.220 -999.990 ... R4 1994 10 26 11 29 00 76.2470 -119.3533 35.00 30.00 5.00 74839 MBC 1994 09 08 22 55 00 6688-66 P co CCGG 104.850 -999.990 ... R4 1994 10 26 11 45 00 76.2470 -119.3533 35.00 30.00 5.00 74840 MBC 1994 09 13 01 55 00 6367-66 P co CCGG 112.300 -999.990 ... R4 1994 10 27 10 52 00 76.2470 -119.3533 35.00 30.00 5.00 74841 MBC 1994 09 13 01 55 00 6368-66 P co CCGG 111.910 -999.990 ... R4 1994 10 27 11 08 00 76.2470 -119.3533 35.00 30.00 5.00 74842 MBC 1994 09 16 02 15 00 6293-66 P co CCGG 112.110 -999.990 ... R4 1994 10 27 09 48 00 76.2470 -119.3533 35.00 30.00 5.00 74843 MBC 1994 09 16 02 15 00 6294-66 P co CCGG 111.810 -999.990 ... R4 1994 10 27 10 04 00 76.2470 -119.3533 35.00 30.00 5.00 74844 MBC 1994 09 19 23 00 00 6911-66 P co CCGG 128.010 -999.990 ... R4 1994 10 27 11 28 00 76.2470 -119.3533 35.00 30.00 5.00 74845 MBC 1994 09 19 23 00 00 6912-66 P co CCGG 127.530 -999.990 ... R4 1994 10 27 11 44 00 76.2470 -119.3533 35.00 30.00 5.00 74846 MBC 1994 09 22 13 50 00 6327-66 P co CCGG 130.070 -999.990 ... R4 1994 10 27 10 20 00 76.2470 -119.3533 35.00 30.00 5.00 74847 MBC 1994 09 22 13 50 00 6328-66 P co CCGG 130.210 -999.990 ... R4 1994 10 27 10 36 00 76.2470 -119.3533 35.00 30.00 5.00 74848 MBC 1994 09 26 17 05 00 6105-66 P co CCGG 127.910 -999.990 ... R4 1994 10 26 10 57 00 76.2470 -119.3533 35.00 30.00 5.00 74849 MBC 1994 09 26 17 05 00 6106-66 P co CCGG 127.670 -999.990 ... R4 1994 10 26 11 13 00 76.2470 -119.3533 35.00 30.00 5.00 74850 MBC 1994 09 30 16 00 00 6527-66 P co CCGG 132.500 -999.990 ... R4 1994 10 26 12 33 00 76.2470 -119.3533 35.00 30.00 5.00 74851 MBC 1994 09 30 16 00 00 6528-66 P co CCGG 131.290 -999.990 ... R4 1994 10 26 12 50 00 76.2470 -119.3533 35.00 30.00 5.00 74852 MBC 1994 10 06 18 55 00 6187-66 P co CCGG 131.850 -999.990 ... R4 1994 12 19 17 03 00 76.2470 -119.3533 35.00 30.00 5.00 74853 MBC 1994 10 06 18 55 00 6188-66 P co CCGG 130.970 -999.990 ... R4 1994 12 19 17 20 00 76.2470 -119.3533 35.00 30.00 5.00 74854 MBC 1994 10 14 19 05 00 6465-66 P co CCGG 132.460 -999.990 ... R4 1994 12 19 16 31 00 76.2470 -119.3533 35.00 30.00 5.00 74855 MBC 1994 10 14 19 05 00 6466-66 P co CCGG 132.480 -999.990 ... R4 1994 12 19 16 47 00 76.2470 -119.3533 35.00 30.00 5.00 74856 MBC 1994 10 17 23 00 00 6371-66 P co CCGG 131.510 -999.990 ... R4 1994 12 19 14 39 00 76.2470 -119.3533 35.00 30.00 5.00 74857 MBC 1994 10 17 23 00 00 6372-66 P co CCGG 130.620 -999.990 ... R4 1994 12 19 14 56 00 76.2470 -119.3533 35.00 30.00 5.00 74858 MBC 1994 10 21 01 00 00 6909-66 P co CCGG 129.600 -999.990 ... R4 1994 12 19 17 36 00 76.2470 -119.3533 35.00 30.00 5.00 74859 MBC 1994 10 21 01 00 00 6910-66 P co CCGG 129.040 -999.990 ... R4 1994 12 19 17 52 00 76.2470 -119.3533 35.00 30.00 5.00 74860 MBC 1994 10 24 15 00 00 6859-66 P co CCGG 134.700 -999.990 ... R4 1994 12 20 16 24 00 76.2470 -119.3533 35.00 30.00 5.00 74861 MBC 1994 10 24 15 00 00 6860-66 P co CCGG 135.120 -999.990 ... R4 1994 12 20 16 40 00 76.2470 -119.3533 35.00 30.00 5.00 74862 MBC 1994 10 27 23 00 00 6847-66 P co CCGG 136.960 -999.990 ... R4 1994 12 20 15 52 00 76.2470 -119.3533 35.00 30.00 5.00 74863 MBC 1994 10 27 23 00 00 6848-66 P co CCGG 137.310 -999.990 ... R4 1994 12 20 16 08 00 76.2470 -119.3533 35.00 30.00 5.00 74864 MBC 1994 10 31 22 35 00 6897-66 P co CCGG 129.750 -999.990 ... R4 1994 12 20 14 47 00 76.2470 -119.3533 35.00 30.00 5.00 74865 MBC 1994 10 31 22 35 00 6898-66 P co CCGG 129.800 -999.990 ... R4 1994 12 20 15 03 00 76.2470 -119.3533 35.00 30.00 5.00 74866 MBC 1994 11 05 22 45 00 6403-66 P co CCGG 132.130 -999.990 ... R4 1994 12 20 15 19 00 76.2470 -119.3533 35.00 30.00 5.00 74867 MBC 1994 11 05 22 45 00 6404-66 P co CCGG 132.640 -999.990 ... R4 1994 12 20 15 35 00 76.2470 -119.3533 35.00 30.00 5.00 74868 MBC 1994 11 08 17 30 00 6345-66 P co CCGG 129.470 -999.990 ... R4 1995 01 19 09 52 00 76.2470 -119.3533 35.00 30.00 5.00 74869 MBC 1994 11 08 17 30 00 6346-66 P co CCGG 129.670 -999.990 ... R4 1995 01 19 10 08 00 76.2470 -119.3533 35.00 30.00 5.00 74870 MBC 1994 11 15 23 00 00 6323-66 P co CCGG 134.310 -999.990 ... R4 1995 01 19 09 20 00 76.2470 -119.3533 35.00 30.00 5.00 74871 MBC 1994 11 15 23 00 00 6324-66 P co CCGG 134.180 -999.990 ... R4 1995 01 19 09 36 00 76.2470 -119.3533 35.00 30.00 5.00 74872 MBC 1994 11 17 11 00 00 6385-66 P co CCGG 133.180 -999.990 ... R4 1995 01 19 10 57 00 76.2470 -119.3533 35.00 30.00 5.00 74873 MBC 1994 11 17 11 00 00 6386-66 P co CCGG 133.030 -999.990 ... R4 1995 01 19 11 13 00 76.2470 -119.3533 35.00 30.00 5.00 74874 MBC 1994 11 21 23 00 00 6009-66 P co CCGG 136.100 -999.990 ... R4 1995 01 19 10 25 00 76.2470 -119.3533 35.00 30.00 5.00 74875 MBC 1994 11 21 23 00 00 6010-66 P co CCGG 135.040 -999.990 ... R4 1995 01 19 10 41 00 76.2470 -119.3533 35.00 30.00 5.00 74876 MBC 1994 11 24 11 00 00 6553-66 P co CCGG 137.960 -999.990 ... R4 1995 01 13 11 36 00 76.2470 -119.3533 35.00 30.00 5.00 74877 MBC 1994 11 24 11 00 00 6554-66 P co CCGG 136.960 -999.990 ... R4 1995 01 13 11 52 00 76.2470 -119.3533 35.00 30.00 5.00 74878 MBC 1994 12 01 11 00 00 6071-66 P co CCGG 149.760 -999.990 ... R4 1995 01 13 11 03 00 76.2470 -119.3533 35.00 30.00 5.00 74879 MBC 1994 12 01 11 00 00 6072-66 P co CCGG 149.760 -999.990 ... R4 1995 01 13 11 20 00 76.2470 -119.3533 35.00 30.00 5.00 74880 MBC 1994 12 06 23 00 00 6571-66 P co CCGG 160.980 -999.990 ... R4 1995 01 13 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74881 MBC 1994 12 06 23 00 00 6572-66 P co CCGG 158.340 -999.990 ... R4 1995 01 13 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74882 MBC 1994 12 08 11 15 00 6321-66 P co CCGG 530.690 -999.990 P.C R4 1995 02 15 14 28 00 76.2470 -119.3533 35.00 30.00 5.00 74883 MBC 1994 12 08 11 15 00 6322-66 P co CCGG 152.090 -999.990 P.. R4 1995 02 15 14 44 00 76.2470 -119.3533 35.00 30.00 5.00 74884 MBC 1994 12 12 11 15 00 6863-66 P co CCGG 155.790 -999.990 ... R4 1995 02 15 15 00 00 76.2470 -119.3533 35.00 30.00 5.00 74885 MBC 1994 12 12 11 15 00 6864-66 P co CCGG 155.220 -999.990 ... R4 1995 02 15 15 16 00 76.2470 -119.3533 35.00 30.00 5.00 74886 MBC 1994 12 15 11 00 00 6035-66 P co CCGG 160.040 -999.990 ... R4 1995 02 16 10 32 00 76.2470 -119.3533 35.00 30.00 5.00 74887 MBC 1994 12 15 11 00 00 6036-66 P co CCGG 159.640 -999.990 ... R4 1995 02 16 10 48 00 76.2470 -119.3533 35.00 30.00 5.00 74888 MBC 1994 12 19 11 15 00 6397-66 P co CCGG 154.680 -999.990 P.. R4 1995 02 16 09 59 00 76.2470 -119.3533 35.00 30.00 5.00 74889 MBC 1994 12 19 11 15 00 6398-66 P co CCGG 158.580 -999.990 P.. R4 1995 02 16 10 15 00 76.2470 -119.3533 35.00 30.00 5.00 74890 MBC 1994 12 22 22 45 00 6681-66 P co CCGG 151.210 -999.990 ... R4 1995 02 16 11 04 00 76.2470 -119.3533 35.00 30.00 5.00 74891 MBC 1994 12 22 22 45 00 6682-66 P co CCGG 150.010 -999.990 ... R4 1995 02 16 11 20 00 76.2470 -119.3533 35.00 30.00 5.00 74892 MBC 1994 12 27 23 00 00 6519-66 P co CCGG 186.610 -999.990 P.. R4 1995 02 16 09 27 00 76.2470 -119.3533 35.00 30.00 5.00 74893 MBC 1994 12 27 23 00 00 6520-66 P co CCGG 183.340 -999.990 P.. R4 1995 02 16 09 43 00 76.2470 -119.3533 35.00 30.00 5.00 74894 MBC 1994 12 29 11 00 00 6283-66 P co CCGG 149.960 -999.990 ... R4 1995 02 15 13 53 00 76.2470 -119.3533 35.00 30.00 5.00 74895 MBC 1994 12 29 11 00 00 6284-66 P co CCGG 149.720 -999.990 ... R4 1995 02 15 14 09 00 76.2470 -119.3533 35.00 30.00 5.00 74896 MBC 1995 01 09 11 00 00 6227-66 P co CCGG 156.440 -999.990 ... R4 1995 02 15 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74897 MBC 1995 01 09 11 00 00 6228-66 P co CCGG 156.980 -999.990 ... R4 1995 02 15 13 37 00 76.2470 -119.3533 35.00 30.00 5.00 74898 MBC 1995 01 19 22 45 00 6311-66 P co CCGG 172.010 -999.990 ... R4 1995 02 16 13 25 00 76.2470 -119.3533 35.00 30.00 5.00 74899 MBC 1995 01 19 22 45 00 6312-66 P co CCGG 171.000 -999.990 ... R4 1995 02 16 13 41 00 76.2470 -119.3533 35.00 30.00 5.00 74900 MBC 1995 01 24 23 00 00 6081-66 P co CCGG 163.470 -999.990 ... R4 1995 02 16 11 43 00 76.2470 -119.3533 35.00 30.00 5.00 74901 MBC 1995 01 24 23 00 00 6082-66 P co CCGG 162.690 -999.990 ... R4 1995 02 16 11 59 00 76.2470 -119.3533 35.00 30.00 5.00 74902 MBC 1995 01 30 11 00 00 6527-66 P co CCGG 182.970 -999.990 ... R4 1995 04 21 15 31 00 76.2470 -119.3533 35.00 30.00 5.00 74903 MBC 1995 01 30 11 00 00 6528-66 P co CCGG 182.660 -999.990 ... R4 1995 04 21 15 47 00 76.2470 -119.3533 35.00 30.00 5.00 74904 MBC 1995 02 02 11 20 00 6693-66 P co CCGG 173.190 -999.990 ... R4 1995 04 21 14 19 00 76.2470 -119.3533 35.00 30.00 5.00 74905 MBC 1995 02 02 11 20 00 6694-66 P co CCGG 174.290 -999.990 ... R4 1995 04 21 14 35 00 76.2470 -119.3533 35.00 30.00 5.00 74906 MBC 1995 02 19 01 45 00 6814-66 P co CCGG 187.650 -999.990 ... R4 1995 04 26 08 08 00 76.2470 -119.3533 35.00 30.00 5.00 74907 MBC 1995 02 23 13 35 00 6023-66 P co CCGG 182.130 -999.990 ... R4 1995 04 26 08 25 00 76.2470 -119.3533 35.00 30.00 5.00 74908 MBC 1995 02 23 13 35 00 6024-66 P co CCGG 180.850 -999.990 ... R4 1995 04 26 08 41 00 76.2470 -119.3533 35.00 30.00 5.00 74909 MBC 1995 02 27 11 05 00 6597-66 P co CCGG 182.210 -999.990 ... R4 1995 04 21 16 35 00 76.2470 -119.3533 35.00 30.00 5.00 74910 MBC 1995 02 27 11 05 00 6598-66 P co CCGG 180.500 -999.990 ... R4 1995 04 21 16 51 00 76.2470 -119.3533 35.00 30.00 5.00 74911 MBC 1995 03 02 11 10 00 6117-66 P co CCGG 197.060 -999.990 ... R4 1995 04 21 16 03 00 76.2470 -119.3533 35.00 30.00 5.00 74912 MBC 1995 03 02 11 10 00 6118-66 P co CCGG 197.610 -999.990 ... R4 1995 04 21 16 19 00 76.2470 -119.3533 35.00 30.00 5.00 74913 MBC 1995 03 06 14 35 00 6587-66 P co CCGG 196.010 -999.990 ... R4 1995 04 26 08 57 00 76.2470 -119.3533 35.00 30.00 5.00 74914 MBC 1995 03 06 14 35 00 6588-66 P co CCGG 197.340 -999.990 ... R4 1995 04 26 09 13 00 76.2470 -119.3533 35.00 30.00 5.00 74915 MBC 1995 03 09 11 10 00 6819-66 P co CCGG 199.250 -999.990 ... R4 1995 04 26 07 52 00 76.2470 -119.3533 35.00 30.00 5.00 74916 MBC 1995 03 21 04 00 00 6871-66 P co CCGG 176.860 -999.990 ... R4 1995 05 05 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74917 MBC 1995 03 21 04 00 00 6872-66 P co CCGG 176.590 -999.990 ... R4 1995 05 05 13 52 00 76.2470 -119.3533 35.00 30.00 5.00 74918 MBC 1995 03 23 23 05 00 6195-66 P co CCGG 185.520 -999.990 ... R4 1995 05 05 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 74919 MBC 1995 03 23 23 05 00 6196-66 P co CCGG 186.510 -999.990 ... R4 1995 05 05 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74920 MBC 1995 03 29 07 40 00 6307-66 P co CCGG 189.740 -999.990 ... R4 1995 05 05 12 00 00 76.2470 -119.3533 35.00 30.00 5.00 74921 MBC 1995 03 29 07 40 00 6308-66 P co CCGG 189.910 -999.990 ... R4 1995 05 05 12 16 00 76.2470 -119.3533 35.00 30.00 5.00 74922 MBC 1995 04 07 02 10 00 6377-66 P co CCGG 190.300 -999.990 ... R4 1995 05 05 12 32 00 76.2470 -119.3533 35.00 30.00 5.00 74923 MBC 1995 04 07 02 10 00 6378-66 P co CCGG 193.090 -999.990 ... R4 1995 05 05 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 74924 MBC 1995 04 13 23 05 00 6275-66 P co CCGG 193.340 -999.990 P.. R4 1995 07 10 08 43 00 76.2470 -119.3533 35.00 30.00 5.00 74925 MBC 1995 04 13 23 05 00 6276-66 P co CCGG 196.540 -999.990 P.. R4 1995 07 10 09 00 00 76.2470 -119.3533 35.00 30.00 5.00 74926 MBC 1995 04 20 13 40 00 6013-66 P co CCGG 167.410 -999.990 ... R4 1995 07 10 10 21 00 76.2470 -119.3533 35.00 30.00 5.00 74927 MBC 1995 04 20 13 40 00 6014-66 P co CCGG 169.140 -999.990 ... R4 1995 07 10 10 37 00 76.2470 -119.3533 35.00 30.00 5.00 74928 MBC 1995 04 24 19 00 00 6183-66 P co CCGG 175.610 -999.990 ... R4 1995 07 10 09 16 00 76.2470 -119.3533 35.00 30.00 5.00 74929 MBC 1995 04 24 19 00 00 6184-66 P co CCGG 176.580 -999.990 ... R4 1995 07 10 09 32 00 76.2470 -119.3533 35.00 30.00 5.00 74930 MBC 1995 05 05 23 30 00 6887-66 P co CCGG 157.370 -999.990 ... R4 1995 07 10 09 49 00 76.2470 -119.3533 35.00 30.00 5.00 74931 MBC 1995 05 05 23 30 00 6888-66 P co CCGG 155.990 -999.990 ... R4 1995 07 10 10 05 00 76.2470 -119.3533 35.00 30.00 5.00 74932 MBC 1995 05 08 11 00 00 6909-66 P co CCGG 152.320 -999.990 ... R4 1995 07 07 15 08 00 76.2470 -119.3533 35.00 30.00 5.00 74933 MBC 1995 05 08 11 00 00 6910-66 P co CCGG 151.740 -999.990 ... R4 1995 07 07 15 24 00 76.2470 -119.3533 35.00 30.00 5.00 74934 MBC 1995 05 11 11 00 00 6747-66 P co CCGG 148.600 -999.990 ... R4 1995 06 29 15 48 00 76.2470 -119.3533 35.00 30.00 5.00 74935 MBC 1995 05 11 11 00 00 6748-66 P co CCGG 147.570 -999.990 ... R4 1995 06 29 16 04 00 76.2470 -119.3533 35.00 30.00 5.00 74936 MBC 1995 05 15 23 00 00 6085-66 P co CCGG 145.530 -999.990 ... R4 1995 06 29 15 15 00 76.2470 -119.3533 35.00 30.00 5.00 74937 MBC 1995 05 15 23 00 00 6086-66 P co CCGG 144.760 -999.990 ... R4 1995 06 29 15 31 00 76.2470 -119.3533 35.00 30.00 5.00 74938 MBC 1995 05 18 11 15 00 6665-66 P co CCGG 145.790 -999.990 ... R4 1995 06 29 14 42 00 76.2470 -119.3533 35.00 30.00 5.00 74939 MBC 1995 05 18 11 15 00 6666-66 P co CCGG 148.200 -999.990 ... R4 1995 06 29 14 59 00 76.2470 -119.3533 35.00 30.00 5.00 74940 MBC 1995 05 26 11 10 00 6365-66 P co CCGG 140.160 -999.990 ... R4 1995 07 10 13 11 00 76.2470 -119.3533 35.00 30.00 5.00 74941 MBC 1995 05 26 11 10 00 6366-66 P co CCGG 139.600 -999.990 ... R4 1995 07 10 13 27 00 76.2470 -119.3533 35.00 30.00 5.00 74942 MBC 1995 05 29 13 45 00 6369-66 P co CCGG 127.000 -999.990 ... R4 1995 07 10 12 39 00 76.2470 -119.3533 35.00 30.00 5.00 74943 MBC 1995 05 29 13 45 00 6370-66 P co CCGG 127.370 -999.990 ... R4 1995 07 10 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 74944 MBC 1995 06 01 11 00 00 6203-66 P co CCGG 119.820 -999.990 ... R4 1995 07 10 10 59 00 76.2470 -119.3533 35.00 30.00 5.00 74945 MBC 1995 06 01 11 00 00 6204-66 P co CCGG 119.500 -999.990 ... R4 1995 07 10 11 15 00 76.2470 -119.3533 35.00 30.00 5.00 74946 MBC 1995 06 05 11 10 00 6165-66 P co CCGG 110.800 -999.990 ... R4 1995 07 10 11 31 00 76.2470 -119.3533 35.00 30.00 5.00 74947 MBC 1995 06 05 11 10 00 6166-66 P co CCGG 110.590 -999.990 ... R4 1995 07 10 11 47 00 76.2470 -119.3533 35.00 30.00 5.00 74948 MBC 1995 06 09 11 10 00 6841-66 P co CCGG 128.600 -999.990 ... R4 1995 07 07 14 03 00 76.2470 -119.3533 35.00 30.00 5.00 74949 MBC 1995 06 09 11 10 00 6842-66 P co CCGG 128.700 -999.990 ... R4 1995 07 07 14 19 00 76.2470 -119.3533 35.00 30.00 5.00 74950 MBC 1995 06 12 14 00 00 6861-66 P co CCGG 117.210 -999.990 ... R4 1995 07 07 14 35 00 76.2470 -119.3533 35.00 30.00 5.00 74951 MBC 1995 06 12 14 00 00 6862-66 P co CCGG 115.510 -999.990 ... R4 1995 07 07 14 52 00 76.2470 -119.3533 35.00 30.00 5.00 74952 MBC 1995 06 15 11 10 00 6663-66 P co CCGG 105.540 -999.990 ... R7 1995 08 15 14 56 00 76.2470 -119.3533 35.00 30.00 5.00 74953 MBC 1995 06 19 14 00 00 6301-66 P co CCGG 100.390 -999.990 ... R7 1995 08 15 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 74955 MBC 1995 06 19 14 00 00 6302-66 P co CCGG 102.410 -999.990 ... R7 1995 08 15 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 74956 MBC 1995 06 27 14 15 00 6405-66 P co CCGG 96.980 -999.990 ... R7 1995 08 15 13 52 00 76.2470 -119.3533 35.00 30.00 5.00 74957 MBC 1995 06 27 14 15 00 6406-66 P co CCGG 96.180 -999.990 ... R7 1995 08 15 14 08 00 76.2470 -119.3533 35.00 30.00 5.00 74958 MBC 1995 07 01 19 00 00 6547-66 P co CCGG 94.150 -999.990 ... R7 1995 08 15 14 24 00 76.2470 -119.3533 35.00 30.00 5.00 74959 MBC 1995 07 01 19 00 00 6548-66 P co CCGG 96.270 -999.990 ... R7 1995 08 15 14 40 00 76.2470 -119.3533 35.00 30.00 5.00 74960 MBC 1995 07 03 16 00 00 6545-66 P co CCGG 94.320 -999.990 ... R7 1995 08 15 18 24 00 76.2470 -119.3533 35.00 30.00 5.00 74961 MBC 1995 07 03 16 00 00 6546-66 P co CCGG 94.830 -999.990 ... R7 1995 08 15 18 40 00 76.2470 -119.3533 35.00 30.00 5.00 74962 MBC 1995 07 06 11 20 00 6687-66 P co CCGG 91.280 -999.990 ... R7 1995 08 15 17 52 00 76.2470 -119.3533 35.00 30.00 5.00 74963 MBC 1995 07 06 11 20 00 6688-66 P co CCGG 88.900 -999.990 ... R7 1995 08 15 18 08 00 76.2470 -119.3533 35.00 30.00 5.00 74964 MBC 1995 07 10 18 30 00 6487-66 P co CCGG 87.490 -999.990 ... R7 1995 08 15 19 28 00 76.2470 -119.3533 35.00 30.00 5.00 74965 MBC 1995 07 10 18 30 00 6488-66 P co CCGG 89.050 -999.990 ... R7 1995 08 15 19 43 00 76.2470 -119.3533 35.00 30.00 5.00 74966 MBC 1995 07 13 17 30 00 6453-66 P co CCGG 86.120 -999.990 P.. R7 1995 08 15 18 56 00 76.2470 -119.3533 35.00 30.00 5.00 74967 MBC 1995 07 13 17 30 00 6454-66 P co CCGG 89.710 -999.990 P.. R7 1995 08 15 19 12 00 76.2470 -119.3533 35.00 30.00 5.00 74968 MBC 1995 07 17 15 20 00 6329-66 P co CCGG 94.340 -999.990 ... R7 1995 09 25 07 39 00 76.2470 -119.3533 35.00 30.00 5.00 74969 MBC 1995 07 17 15 20 00 6330-66 P co CCGG 96.270 -999.990 ... R7 1995 09 25 07 55 00 76.2470 -119.3533 35.00 30.00 5.00 74970 MBC 1995 07 20 15 46 00 6153-66 P co CCGG 93.420 -999.990 ... R7 1995 09 25 07 07 00 76.2470 -119.3533 35.00 30.00 5.00 74971 MBC 1995 07 20 15 46 00 6154-66 P co CCGG 92.590 -999.990 ... R7 1995 09 25 07 23 00 76.2470 -119.3533 35.00 30.00 5.00 74972 MBC 1995 08 02 11 15 00 6903-66 P co CCGG 99.640 -999.990 ... R7 1995 09 25 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 74973 MBC 1995 08 02 11 15 00 6904-66 P co CCGG 101.710 -999.990 ... R7 1995 09 25 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 74974 MBC 1995 08 07 20 06 00 6567-66 P co CCGG 94.520 -999.990 ... R7 1995 09 25 11 43 00 76.2470 -119.3533 35.00 30.00 5.00 74975 MBC 1995 08 07 20 06 00 6568-66 P co CCGG 93.450 -999.990 ... R7 1995 09 25 11 59 00 76.2470 -119.3533 35.00 30.00 5.00 74976 MBC 1995 08 10 11 15 00 6905-66 P co CCGG 94.950 -999.990 ... R7 1995 09 22 13 37 00 76.2470 -119.3533 35.00 30.00 5.00 74977 MBC 1995 08 10 11 15 00 6906-66 P co CCGG 94.040 -999.990 ... R7 1995 09 22 13 53 00 76.2470 -119.3533 35.00 30.00 5.00 74978 MBC 1995 08 14 11 15 00 6045-66 P co CCGG 113.790 -999.990 .X. R7 1995 09 22 14 09 00 76.2470 -119.3533 35.00 30.00 5.00 74979 MBC 1995 08 14 11 15 00 6046-66 P co CCGG 112.120 -999.990 .X. R7 1995 09 22 14 25 00 76.2470 -119.3533 35.00 30.00 5.00 74980 MBC 1995 08 17 11 15 00 6161-66 P co CCGG 90.030 -999.990 ... R7 1995 09 25 08 11 00 76.2470 -119.3533 35.00 30.00 5.00 74981 MBC 1995 08 17 11 15 00 6162-66 P co CCGG 88.980 -999.990 ... R7 1995 09 25 08 28 00 76.2470 -119.3533 35.00 30.00 5.00 74982 MBC 1995 08 26 23 15 00 6647-66 P co CCGG 91.800 -999.990 P.. R7 1995 09 25 06 35 00 76.2470 -119.3533 35.00 30.00 5.00 74983 MBC 1995 08 26 23 15 00 6648-66 P co CCGG 96.200 -999.990 P.. R7 1995 09 25 06 51 00 76.2470 -119.3533 35.00 30.00 5.00 74984 MBC 1995 08 29 16 30 00 6089-66 P co CCGG 91.740 -999.990 P.. R7 1995 11 07 18 09 00 76.2470 -119.3533 35.00 30.00 5.00 74985 MBC 1995 08 29 16 30 00 6090-66 P co CCGG 88.580 -999.990 P.. R7 1995 11 07 18 25 00 76.2470 -119.3533 35.00 30.00 5.00 74986 MBC 1995 08 31 23 15 00 6583-66 P co CCGG 90.130 -999.990 ... R7 1995 11 07 18 41 00 76.2470 -119.3533 35.00 30.00 5.00 74987 MBC 1995 08 31 23 15 00 6584-66 P co CCGG 91.810 -999.990 ... R7 1995 11 07 18 58 00 76.2470 -119.3533 35.00 30.00 5.00 74988 MBC 1995 09 07 14 34 00 6027-66 P co CCGG 98.330 -999.990 ... R7 1995 11 08 10 54 00 76.2470 -119.3533 35.00 30.00 5.00 74989 MBC 1995 09 07 14 34 00 6028-66 P co CCGG 98.440 -999.990 ... R7 1995 11 08 11 10 00 76.2470 -119.3533 35.00 30.00 5.00 74990 MBC 1995 09 10 23 25 00 6379-66 P co CCGG 97.840 -999.990 ... R7 1995 11 08 11 26 00 76.2470 -119.3533 35.00 30.00 5.00 74991 MBC 1995 09 10 23 25 00 6380-66 P co CCGG 98.240 -999.990 ... R7 1995 11 08 11 42 00 76.2470 -119.3533 35.00 30.00 5.00 74992 MBC 1995 09 15 14 15 00 6549-66 P co CCGG 106.330 -999.990 ... R7 1995 11 08 07 28 00 76.2470 -119.3533 35.00 30.00 5.00 74993 MBC 1995 09 15 14 15 00 6550-66 P co CCGG 106.050 -999.990 ... R7 1995 11 08 07 44 00 76.2470 -119.3533 35.00 30.00 5.00 74994 MBC 1995 09 18 11 15 00 6761-66 P co CCGG 106.180 -999.990 ... R7 1995 11 08 09 05 00 76.2470 -119.3533 35.00 30.00 5.00 74995 MBC 1995 09 18 11 15 00 6762-66 P co CCGG 106.590 -999.990 ... R7 1995 11 08 09 21 00 76.2470 -119.3533 35.00 30.00 5.00 74996 MBC 1995 09 21 23 00 00 6021-66 P co CCGG 97.820 -999.990 ... R7 1995 11 07 17 37 00 76.2470 -119.3533 35.00 30.00 5.00 74997 MBC 1995 09 21 23 00 00 6022-66 P co CCGG 99.120 -999.990 ... R7 1995 11 07 17 53 00 76.2470 -119.3533 35.00 30.00 5.00 74998 MBC 1995 09 25 15 30 00 6729-66 P co CCGG 109.270 -999.990 ... R7 1995 11 07 17 05 00 76.2470 -119.3533 35.00 30.00 5.00 74999 MBC 1995 09 25 15 30 00 6730-66 P co CCGG 109.800 -999.990 ... R7 1995 11 07 17 21 00 76.2470 -119.3533 35.00 30.00 5.00 75000 MBC 1995 10 06 11 30 00 6607-66 P co CCGG 110.290 -999.990 ... R7 1995 12 13 17 48 00 76.2470 -119.3533 35.00 30.00 5.00 75001 MBC 1995 10 06 11 30 00 6608-66 P co CCGG 110.770 -999.990 ... R7 1995 12 13 18 04 00 76.2470 -119.3533 35.00 30.00 5.00 75002 MBC 1995 10 09 11 15 00 6923-66 P co CCGG 111.700 -999.990 ... R7 1995 12 14 11 12 00 76.2470 -119.3533 35.00 30.00 5.00 75003 MBC 1995 10 09 11 15 00 6924-66 P co CCGG 109.000 -999.990 ... R7 1995 12 14 11 28 00 76.2470 -119.3533 35.00 30.00 5.00 75004 MBC 1995 10 12 11 15 00 6719-66 P co CCGG 105.860 -999.990 ... R7 1995 12 13 18 20 00 76.2470 -119.3533 35.00 30.00 5.00 75005 MBC 1995 10 12 11 15 00 6720-66 P co CCGG 106.900 -999.990 ... R7 1995 12 13 18 36 00 76.2470 -119.3533 35.00 30.00 5.00 75006 MBC 1995 10 19 13 40 00 6195-66 P co CCGG 109.600 -999.990 ... R7 1995 12 13 17 15 00 76.2470 -119.3533 35.00 30.00 5.00 75007 MBC 1995 10 19 13 40 00 6196-66 P co CCGG 109.940 -999.990 ... R7 1995 12 13 17 32 00 76.2470 -119.3533 35.00 30.00 5.00 75008 MBC 1995 10 23 14 40 00 1245-91 P co CCGG 111.360 -999.990 ... R7 1995 12 08 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 75009 MBC 1995 10 23 14 40 00 1246-91 P co CCGG 110.110 -999.990 ... R7 1995 12 08 13 11 00 76.2470 -119.3533 35.00 30.00 5.00 75010 MBC 1995 10 26 16 22 00 251-91 P co CCGG 111.870 -999.990 ... R7 1995 12 08 11 51 00 76.2470 -119.3533 35.00 30.00 5.00 75011 MBC 1995 10 26 16 22 00 252-91 P co CCGG 112.590 -999.990 ... R7 1995 12 08 12 07 00 76.2470 -119.3533 35.00 30.00 5.00 75012 MBC 1995 11 02 10 50 00 361-91 P co CCGG 122.030 -999.990 ... R7 1995 12 08 11 11 00 76.2470 -119.3533 35.00 30.00 5.00 75013 MBC 1995 11 02 10 50 00 362-91 P co CCGG 121.950 -999.990 ... R7 1995 12 08 11 27 00 76.2470 -119.3533 35.00 30.00 5.00 75014 MBC 1995 11 06 10 50 00 561-91 P co CCGG 118.460 -999.990 ... R7 1995 12 08 10 39 00 76.2470 -119.3533 35.00 30.00 5.00 75015 MBC 1995 11 06 10 50 00 562-91 P co CCGG 118.210 -999.990 ... R7 1995 12 08 10 55 00 76.2470 -119.3533 35.00 30.00 5.00 75016 MBC 1995 11 10 22 50 00 6457-66 P co CCGG 124.120 -999.990 ... R7 1996 01 19 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 75017 MBC 1995 11 10 22 50 00 6458-66 P co CCGG 125.410 -999.990 ... R7 1996 01 19 13 52 00 76.2470 -119.3533 35.00 30.00 5.00 75018 MBC 1995 11 13 10 50 00 6707-66 P co CCGG 121.560 -999.990 ... R7 1996 01 19 13 03 00 76.2470 -119.3533 35.00 30.00 5.00 75019 MBC 1995 11 13 10 50 00 6708-66 P co CCGG 121.640 -999.990 ... R7 1996 01 19 13 19 00 76.2470 -119.3533 35.00 30.00 5.00 75020 MBC 1995 11 17 10 50 00 6199-66 P co CCGG 126.450 -999.990 ... R7 1996 01 19 14 41 00 76.2470 -119.3533 35.00 30.00 5.00 75021 MBC 1995 11 17 10 50 00 6200-66 P co CCGG 125.850 -999.990 ... R7 1996 01 19 14 57 00 76.2470 -119.3533 35.00 30.00 5.00 75022 MBC 1995 11 23 13 23 00 6735-66 P co CCGG 127.840 -999.990 ... R7 1996 01 19 14 08 00 76.2470 -119.3533 35.00 30.00 5.00 75023 MBC 1995 11 23 13 23 00 6736-66 P co CCGG 128.700 -999.990 ... R7 1996 01 19 14 24 00 76.2470 -119.3533 35.00 30.00 5.00 75024 MBC 1995 11 30 11 00 00 6229-66 P co CCGG 132.990 -999.990 ... R7 1996 01 22 13 02 00 76.2470 -119.3533 35.00 30.00 5.00 75025 MBC 1995 11 30 11 00 00 6230-66 P co CCGG 132.600 -999.990 ... R7 1996 01 22 13 18 00 76.2470 -119.3533 35.00 30.00 5.00 75026 MBC 1995 12 07 11 00 00 6077-66 P co CCGG 134.730 -999.990 ... R7 1996 01 19 18 22 00 76.2470 -119.3533 35.00 30.00 5.00 75027 MBC 1995 12 07 11 00 00 6078-66 P co CCGG 137.610 -999.990 ... R7 1996 01 19 18 38 00 76.2470 -119.3533 35.00 30.00 5.00 75028 MBC 1995 12 18 11 00 00 1499-91 P co CCGG 149.100 -999.990 ... R7 1996 01 22 14 15 00 76.2470 -119.3533 35.00 30.00 5.00 75029 MBC 1995 12 18 11 00 00 1500-91 P co CCGG 149.490 -999.990 ... R7 1996 01 22 14 31 00 76.2470 -119.3533 35.00 30.00 5.00 75030 MBC 1995 12 21 11 00 00 1501-91 P co CCGG 313.460 -999.990 P.C R7 1996 01 22 14 48 00 76.2470 -119.3533 35.00 30.00 5.00 75031 MBC 1995 12 21 11 00 00 1502-91 P co CCGG 288.580 -999.990 P.C R7 1996 01 22 15 04 00 76.2470 -119.3533 35.00 30.00 5.00 75032 MBC 1995 12 25 11 20 00 1503-91 P co CCGG 139.820 -999.990 ... R7 1996 03 28 10 45 00 76.2470 -119.3533 35.00 30.00 5.00 75033 MBC 1995 12 25 11 20 00 1504-91 P co CCGG 139.920 -999.990 ... R7 1996 03 28 11 01 00 76.2470 -119.3533 35.00 30.00 5.00 75034 MBC 1996 01 01 11 25 00 1505-91 P co CCGG 182.220 -999.990 .X. R7 1996 03 28 11 17 00 76.2470 -119.3533 35.00 30.00 5.00 75035 MBC 1996 01 01 11 25 00 1506-91 P co CCGG 183.660 -999.990 .X. R7 1996 03 28 11 33 00 76.2470 -119.3533 35.00 30.00 5.00 75036 MBC 1996 01 08 11 20 00 341-91 P co CCGG 147.060 -999.990 P.. R7 1996 03 26 11 16 00 76.2470 -119.3533 35.00 30.00 5.00 75037 MBC 1996 01 08 11 20 00 342-91 P co CCGG 320.880 -999.990 P.C R7 1996 03 26 11 33 00 76.2470 -119.3533 35.00 30.00 5.00 75038 MBC 1996 01 12 11 20 00 1413-91 P co CCGG 161.320 -999.990 ... R7 1996 03 26 10 44 00 76.2470 -119.3533 35.00 30.00 5.00 75039 MBC 1996 01 12 11 20 00 1414-91 P co CCGG 160.950 -999.990 ... R7 1996 03 26 11 00 00 76.2470 -119.3533 35.00 30.00 5.00 75040 MBC 1996 01 19 13 30 00 6649-66 P co CCGG 162.810 -999.990 ... R7 1996 03 25 17 04 00 76.2470 -119.3533 35.00 30.00 5.00 75041 MBC 1996 01 19 13 30 00 6650-66 P co CCGG 163.630 -999.990 ... R7 1996 03 25 17 20 00 76.2470 -119.3533 35.00 30.00 5.00 75042 MBC 1996 01 26 14 30 00 6509-66 P co CCGG 161.100 -999.990 ... R7 1996 03 25 17 36 00 76.2470 -119.3533 35.00 30.00 5.00 75043 MBC 1996 01 26 14 30 00 6510-66 P co CCGG 163.480 -999.990 ... R7 1996 03 25 17 52 00 76.2470 -119.3533 35.00 30.00 5.00 75044 MBC 1996 01 29 23 20 00 6047-66 P co CCGG 164.070 -999.990 ... R7 1996 03 28 11 57 00 76.2470 -119.3533 35.00 30.00 5.00 75045 MBC 1996 01 29 23 20 00 6048-66 P co CCGG 164.630 -999.990 ... R7 1996 03 28 12 13 00 76.2470 -119.3533 35.00 30.00 5.00 75046 MBC 1996 02 02 18 15 00 6339-66 P co CCGG 159.870 -999.990 ... R7 1996 03 28 12 29 00 76.2470 -119.3533 35.00 30.00 5.00 75047 MBC 1996 02 02 18 15 00 6340-66 P co CCGG 159.660 -999.990 ... R7 1996 03 28 12 45 00 76.2470 -119.3533 35.00 30.00 5.00 75048 MBC 1996 02 05 14 30 00 6849-66 P co CCGG 158.480 -999.990 ... R7 1996 03 25 18 48 00 76.2470 -119.3533 35.00 30.00 5.00 75049 MBC 1996 02 05 14 30 00 6850-66 P co CCGG 160.470 -999.990 ... R7 1996 03 25 19 04 00 76.2470 -119.3533 35.00 30.00 5.00 75050 MBC 1996 02 10 23 30 00 6215-66 P co CCGG 171.360 -999.990 ... R7 1996 03 25 19 20 00 76.2470 -119.3533 35.00 30.00 5.00 75051 MBC 1996 02 10 23 30 00 6216-66 P co CCGG 170.510 -999.990 ... R7 1996 03 25 19 36 00 76.2470 -119.3533 35.00 30.00 5.00 75052 MBC 1996 02 12 14 30 00 6063-66 P co CCGG 167.910 -999.990 ... R7 1996 03 28 10 09 00 76.2470 -119.3533 35.00 30.00 5.00 75053 MBC 1996 02 12 14 30 00 6064-66 P co CCGG 169.920 -999.990 ... R7 1996 03 28 10 25 00 76.2470 -119.3533 35.00 30.00 5.00 75054 MBC 1996 02 15 23 30 00 6419-66 P co CCGG 165.420 -999.990 ... R7 1996 03 26 13 45 00 76.2470 -119.3533 35.00 30.00 5.00 75055 MBC 1996 02 15 23 30 00 6420-66 P co CCGG 164.470 -999.990 ... R7 1996 03 26 14 01 00 76.2470 -119.3533 35.00 30.00 5.00 75056 MBC 1996 02 19 23 20 00 6493-66 P co CCGG 165.570 -999.990 ... R7 1996 03 26 09 36 00 76.2470 -119.3533 35.00 30.00 5.00 75057 MBC 1996 02 19 23 20 00 6494-66 P co CCGG 165.890 -999.990 ... R7 1996 03 26 09 52 00 76.2470 -119.3533 35.00 30.00 5.00 75058 MBC 1996 02 22 23 20 00 6151-66 P co CCGG 190.000 -999.990 ... R7 1996 03 26 10 08 00 76.2470 -119.3533 35.00 30.00 5.00 75059 MBC 1996 02 22 23 20 00 6152-66 P co CCGG 190.430 -999.990 ... R7 1996 03 26 10 24 00 76.2470 -119.3533 35.00 30.00 5.00 75060 MBC 1996 02 27 15 30 00 251-91 P co CCGG 176.850 -999.990 ... R7 1996 03 26 09 04 00 76.2470 -119.3533 35.00 30.00 5.00 75061 MBC 1996 02 27 15 30 00 252-91 P co CCGG 174.150 -999.990 ... R7 1996 03 26 09 20 00 76.2470 -119.3533 35.00 30.00 5.00 75062 MBC 1996 02 29 15 30 00 383-91 P co CCGG 187.040 -999.990 ... R7 1996 03 26 08 32 00 76.2470 -119.3533 35.00 30.00 5.00 75063 MBC 1996 02 29 15 30 00 384-91 P co CCGG 185.590 -999.990 ... R7 1996 03 26 08 48 00 76.2470 -119.3533 35.00 30.00 5.00 75064 MBC 1996 03 05 13 30 00 1803-91 P co CCGG 172.730 -999.990 ... R7 1996 07 22 14 51 00 76.2470 -119.3533 35.00 30.00 5.00 75065 MBC 1996 03 05 13 30 00 1804-91 P co CCGG 173.560 -999.990 ... R7 1996 07 22 15 07 00 76.2470 -119.3533 35.00 30.00 5.00 75066 MBC 1996 03 09 15 30 00 1461-91 P co CCGG 165.150 -999.990 ... R7 1996 07 22 15 23 00 76.2470 -119.3533 35.00 30.00 5.00 75067 MBC 1996 03 09 15 30 00 1462-91 P co CCGG 164.540 -999.990 ... R7 1996 07 22 15 39 00 76.2470 -119.3533 35.00 30.00 5.00 75068 MBC 1996 03 11 02 00 00 1811-91 P co CCGG 179.110 -999.990 P.. R7 1996 06 10 12 41 00 76.2470 -119.3533 35.00 30.00 5.00 75069 MBC 1996 03 11 02 00 00 1812-91 P co CCGG 174.550 -999.990 P.. R7 1996 06 10 12 57 00 76.2470 -119.3533 35.00 30.00 5.00 75070 MBC 1996 03 15 03 00 00 1809-91 P co CCGG 175.630 -999.990 ... R7 1996 06 10 12 09 00 76.2470 -119.3533 35.00 30.00 5.00 75071 MBC 1996 03 15 03 00 00 1810-91 P co CCGG 175.740 -999.990 ... R7 1996 06 10 12 25 00 76.2470 -119.3533 35.00 30.00 5.00 75072 MBC 1996 03 18 11 15 00 1807-91 P co CCGG 186.350 -999.990 ... R7 1996 06 07 16 45 00 76.2470 -119.3533 35.00 30.00 5.00 75073 MBC 1996 03 18 11 15 00 1808-91 P co CCGG 186.270 -999.990 ... R7 1996 06 07 17 01 00 76.2470 -119.3533 35.00 30.00 5.00 75074 MBC 1996 03 22 18 55 00 1805-91 P co CCGG 171.350 -999.990 P.. R7 1996 06 07 17 17 00 76.2470 -119.3533 35.00 30.00 5.00 75075 MBC 1996 03 22 18 55 00 1806-91 P co CCGG 174.430 -999.990 P.. R7 1996 06 07 17 33 00 76.2470 -119.3533 35.00 30.00 5.00 75076 MBC 1996 03 25 14 30 00 1477-91 P co CCGG 177.230 -999.990 ... R7 1996 06 10 11 37 00 76.2470 -119.3533 35.00 30.00 5.00 75077 MBC 1996 03 25 14 30 00 1478-91 P co CCGG 177.000 -999.990 ... R7 1996 06 10 11 53 00 76.2470 -119.3533 35.00 30.00 5.00 75078 MBC 1996 03 28 16 00 00 1459-91 P co CCGG 173.500 -999.990 ... R7 1996 06 10 13 13 00 76.2470 -119.3533 35.00 30.00 5.00 75079 MBC 1996 03 28 16 00 00 1460-91 P co CCGG 173.450 -999.990 ... R7 1996 06 10 13 29 00 76.2470 -119.3533 35.00 30.00 5.00 75080 MBC 1996 04 01 09 30 00 1449-91 P co CCGG 172.510 -999.990 ... R7 1996 06 07 16 13 00 76.2470 -119.3533 35.00 30.00 5.00 75081 MBC 1996 04 01 09 30 00 1450-91 P co CCGG 172.660 -999.990 ... R7 1996 06 07 16 29 00 76.2470 -119.3533 35.00 30.00 5.00 75082 MBC 1996 04 04 18 00 00 1139-91 P co CCGG 172.820 -999.990 ... R7 1996 06 07 15 41 00 76.2470 -119.3533 35.00 30.00 5.00 75083 MBC 1996 04 04 18 00 00 1140-91 P co CCGG 173.890 -999.990 ... R7 1996 06 07 15 57 00 76.2470 -119.3533 35.00 30.00 5.00 75084 MBC 1996 04 08 15 35 00 1451-91 P co CCGG 170.460 -999.990 ... R7 1996 06 10 15 28 00 76.2470 -119.3533 35.00 30.00 5.00 75085 MBC 1996 04 08 15 35 00 1452-91 P co CCGG 172.040 -999.990 ... R7 1996 06 10 15 44 00 76.2470 -119.3533 35.00 30.00 5.00 75086 MBC 1996 04 12 18 20 00 1457-91 P co CCGG 171.600 -999.990 ... R7 1996 06 10 13 51 00 76.2470 -119.3533 35.00 30.00 5.00 75087 MBC 1996 04 12 18 20 00 1458-91 P co CCGG 174.460 -999.990 ... R7 1996 06 10 14 07 00 76.2470 -119.3533 35.00 30.00 5.00 75088 MBC 1996 04 16 02 10 00 779-91 P co CCGG 174.150 -999.990 ... R7 1996 06 10 08 45 00 76.2470 -119.3533 35.00 30.00 5.00 75089 MBC 1996 04 16 02 10 00 780-91 P co CCGG 173.350 -999.990 ... R7 1996 06 10 09 01 00 76.2470 -119.3533 35.00 30.00 5.00 75090 MBC 1996 04 18 11 20 00 1447-91 P co CCGG 174.120 -999.990 ... R7 1996 06 10 10 27 00 76.2470 -119.3533 35.00 30.00 5.00 75091 MBC 1996 04 18 11 20 00 1448-91 P co CCGG 176.600 -999.990 ... R7 1996 06 10 10 43 00 76.2470 -119.3533 35.00 30.00 5.00 75092 MBC 1996 04 22 01 00 00 749-91 P co CCGG 169.970 -999.990 ... R7 1996 06 10 09 24 00 76.2470 -119.3533 35.00 30.00 5.00 75093 MBC 1996 04 22 01 00 00 750-91 P co CCGG 170.180 -999.990 ... R7 1996 06 10 09 40 00 76.2470 -119.3533 35.00 30.00 5.00 75094 MBC 1996 04 26 11 11 00 1289-91 P co CCGG 160.840 -999.990 ... R7 1996 06 10 09 56 00 76.2470 -119.3533 35.00 30.00 5.00 75095 MBC 1996 04 26 11 11 00 1290-91 P co CCGG 160.970 -999.990 ... R7 1996 06 10 10 12 00 76.2470 -119.3533 35.00 30.00 5.00 75096 MBC 1996 04 29 19 20 00 1281-91 P co CCGG 179.470 -999.990 ... R7 1996 07 22 09 55 00 76.2470 -119.3533 35.00 30.00 5.00 75097 MBC 1996 04 29 19 20 00 1282-91 P co CCGG 177.760 -999.990 ... R7 1996 07 22 10 11 00 76.2470 -119.3533 35.00 30.00 5.00 75098 MBC 1996 05 02 11 11 00 175-91 P co CCGG 173.910 -999.990 ... R7 1996 07 22 09 24 00 76.2470 -119.3533 35.00 30.00 5.00 75099 MBC 1996 05 02 11 11 00 176-91 P co CCGG 175.150 -999.990 ... R7 1996 07 22 09 40 00 76.2470 -119.3533 35.00 30.00 5.00 75100 MBC 1996 05 09 11 00 00 79-91 P co CCGG 157.340 -999.990 ... R7 1996 07 22 15 55 00 76.2470 -119.3533 35.00 30.00 5.00 75101 MBC 1996 05 09 11 00 00 80-91 P co CCGG 157.160 -999.990 ... R7 1996 07 22 16 11 00 76.2470 -119.3533 35.00 30.00 5.00 75102 MBC 1996 05 13 11 15 00 303-91 P co CCGG 154.920 -999.990 ... R7 1996 07 22 11 50 00 76.2470 -119.3533 35.00 30.00 5.00 75103 MBC 1996 05 13 11 15 00 304-91 P co CCGG 153.290 -999.990 ... R7 1996 07 22 12 06 00 76.2470 -119.3533 35.00 30.00 5.00 75104 MBC 1996 05 17 11 15 00 1271-91 P co CCGG 148.170 -999.990 ... R7 1996 06 10 08 14 00 76.2470 -119.3533 35.00 30.00 5.00 75105 MBC 1996 05 17 11 15 00 1272-91 P co CCGG 147.720 -999.990 ... R7 1996 06 10 08 30 00 76.2470 -119.3533 35.00 30.00 5.00 75106 MBC 1996 05 20 10 20 00 543-91 P co CCGG 141.850 -999.990 ... R7 1996 06 10 10 59 00 76.2470 -119.3533 35.00 30.00 5.00 75107 MBC 1996 05 20 10 20 00 544-91 P co CCGG 142.320 -999.990 ... R7 1996 06 10 11 15 00 76.2470 -119.3533 35.00 30.00 5.00 75108 MBC 1996 05 24 01 40 00 989-91 P co CCGG 143.010 -999.990 ... R7 1996 07 22 12 54 00 76.2470 -119.3533 35.00 30.00 5.00 75109 MBC 1996 05 24 01 40 00 990-91 P co CCGG 142.660 -999.990 ... R7 1996 07 22 13 10 00 76.2470 -119.3533 35.00 30.00 5.00 75110 MBC 1996 05 30 18 03 00 1501-91 P co CCGG 141.040 -999.990 ... R7 1996 07 22 12 22 00 76.2470 -119.3533 35.00 30.00 5.00 75111 MBC 1996 05 30 18 03 00 1502-91 P co CCGG 140.580 -999.990 ... R7 1996 07 22 12 38 00 76.2470 -119.3533 35.00 30.00 5.00 75112 MBC 1996 06 04 16 51 00 1317-91 P co CCGG 132.440 -999.990 ... R7 1996 07 22 08 52 00 76.2470 -119.3533 35.00 30.00 5.00 75113 MBC 1996 06 04 16 51 00 1318-91 P co CCGG 130.100 -999.990 ... R7 1996 07 22 09 08 00 76.2470 -119.3533 35.00 30.00 5.00 75114 MBC 1996 06 06 19 33 00 495-91 P co CCGG 132.780 -999.990 P.. R7 1996 07 22 08 14 00 76.2470 -119.3533 35.00 30.00 5.00 75115 MBC 1996 06 06 19 33 00 496-91 P co CCGG 129.320 -999.990 P.. R7 1996 07 22 08 30 00 76.2470 -119.3533 35.00 30.00 5.00 75116 MBC 1996 06 11 13 53 00 1185-91 P co CCGG 123.760 -999.990 ... R7 1996 07 19 18 39 00 76.2470 -119.3533 35.00 30.00 5.00 75117 MBC 1996 06 11 13 53 00 1186-91 P co CCGG 123.990 -999.990 ... R7 1996 07 19 18 56 00 76.2470 -119.3533 35.00 30.00 5.00 75118 MBC 1996 06 13 19 25 00 1247-91 P co CCGG 120.730 -999.990 ... R7 1996 07 23 08 46 00 76.2470 -119.3533 35.00 30.00 5.00 75119 MBC 1996 06 13 19 25 00 1248-91 P co CCGG 120.780 -999.990 ... R7 1996 07 23 09 02 00 76.2470 -119.3533 35.00 30.00 5.00 75120 MBC 1996 06 17 09 48 00 491-91 P co CCGG 114.110 -999.990 ... R7 1996 07 22 14 19 00 76.2470 -119.3533 35.00 30.00 5.00 75121 MBC 1996 06 17 09 48 00 492-91 P co CCGG 115.360 -999.990 ... R7 1996 07 22 14 35 00 76.2470 -119.3533 35.00 30.00 5.00 75122 MBC 1996 06 22 18 12 00 203-91 P co CCGG 109.690 -999.990 ... R7 1996 07 19 18 07 00 76.2470 -119.3533 35.00 30.00 5.00 75123 MBC 1996 06 22 18 12 00 204-91 P co CCGG 110.470 -999.990 ... R7 1996 07 19 18 23 00 76.2470 -119.3533 35.00 30.00 5.00 75124 MBC 1996 06 24 17 17 00 155-91 P co CCGG 106.990 -999.990 ... R7 1996 07 19 19 44 00 76.2470 -119.3533 35.00 30.00 5.00 75125 MBC 1996 06 24 17 17 00 156-91 P co CCGG 106.170 -999.990 ... R7 1996 07 19 20 00 00 76.2470 -119.3533 35.00 30.00 5.00 75126 MBC 1996 06 27 20 13 00 319-91 P co CCGG 109.940 -999.990 P.. R7 1996 08 26 10 41 00 76.2470 -119.3533 35.00 30.00 5.00 75127 MBC 1996 06 27 20 13 00 320-91 P co CCGG 106.800 -999.990 P.. R7 1996 08 26 10 57 00 76.2470 -119.3533 35.00 30.00 5.00 75128 MBC 1996 07 01 17 23 00 445-91 P co CCGG 103.560 -999.990 ... R7 1996 08 26 10 09 00 76.2470 -119.3533 35.00 30.00 5.00 75129 MBC 1996 07 01 17 23 00 446-91 P co CCGG 101.460 -999.990 ... R7 1996 08 26 10 25 00 76.2470 -119.3533 35.00 30.00 5.00 75130 MBC 1996 07 11 17 46 00 667-91 P co CCGG 92.750 -999.990 ... R7 1996 08 26 14 22 00 76.2470 -119.3533 35.00 30.00 5.00 75131 MBC 1996 07 11 18 37 00 275-91 P co CCGG 92.810 -999.990 ... R7 1996 08 26 14 55 00 76.2470 -119.3533 35.00 30.00 5.00 75132 MBC 1996 07 11 18 37 00 276-91 P co CCGG 94.000 -999.990 ... R7 1996 08 26 15 11 00 76.2470 -119.3533 35.00 30.00 5.00 75133 MBC 1996 07 15 17 22 00 1776-91 P co CCGG 95.150 -999.990 ... R7 1996 08 26 14 06 00 76.2470 -119.3533 35.00 30.00 5.00 75134 MBC 1996 07 15 17 22 00 1777-91 P co CCGG 93.320 -999.990 ... R7 1996 08 26 15 27 00 76.2470 -119.3533 35.00 30.00 5.00 75135 MBC 1996 07 25 17 29 00 1775-91 P co CCGG 112.020 -999.990 .X. R7 1996 08 26 13 50 00 76.2470 -119.3533 35.00 30.00 5.00 75136 MBC 1996 07 25 17 29 00 1778-91 P co CCGG 109.840 -999.990 .X. R7 1996 08 26 15 43 00 76.2470 -119.3533 35.00 30.00 5.00 75137 MBC 1996 08 03 17 19 00 847-91 P co CCGG 86.560 -999.990 ... R7 1996 08 26 16 09 00 76.2470 -119.3533 35.00 30.00 5.00 75138 MBC 1996 08 03 17 19 00 848-91 P co CCGG 88.660 -999.990 ... R7 1996 08 26 16 25 00 76.2470 -119.3533 35.00 30.00 5.00 75139 MBC 1996 08 08 17 32 00 503-91 P co CCGG 97.670 -999.990 ... R7 1996 10 03 12 40 00 76.2470 -119.3533 35.00 30.00 5.00 75140 MBC 1996 08 08 17 32 00 504-91 P co CCGG 98.390 -999.990 ... R7 1996 10 03 12 56 00 76.2470 -119.3533 35.00 30.00 5.00 75141 MBC 1996 08 12 17 11 00 1797-91 P co CCGG 100.140 -999.990 ... R7 1996 10 03 12 08 00 76.2470 -119.3533 35.00 30.00 5.00 75142 MBC 1996 08 12 17 11 00 1798-91 P co CCGG 98.220 -999.990 ... R7 1996 10 03 12 24 00 76.2470 -119.3533 35.00 30.00 5.00 75143 MBC 1996 08 17 20 27 00 1507-91 P co CCGG 96.160 -999.990 ... R7 1996 10 07 10 01 00 76.2470 -119.3533 35.00 30.00 5.00 75144 MBC 1996 08 17 20 27 00 1508-91 P co CCGG 97.190 -999.990 ... R7 1996 10 07 10 17 00 76.2470 -119.3533 35.00 30.00 5.00 75145 MBC 1996 08 19 17 09 00 763-91 P co CCGG 96.070 -999.990 ... R7 1996 10 07 08 56 00 76.2470 -119.3533 35.00 30.00 5.00 75146 MBC 1996 08 19 17 09 00 764-91 P co CCGG 97.140 -999.990 ... R7 1996 10 07 09 12 00 76.2470 -119.3533 35.00 30.00 5.00 75147 MBC 1996 08 22 17 33 00 595-91 P co CCGG 96.190 -999.990 ... R7 1996 10 16 12 37 00 76.2470 -119.3533 35.00 30.00 5.00 75148 MBC 1996 08 22 17 33 00 596-91 P co CCGG 96.480 -999.990 ... R7 1996 10 16 12 53 00 76.2470 -119.3533 35.00 30.00 5.00 75149 MBC 1996 08 30 17 07 00 1575-91 P co CCGG 101.910 -999.990 ... R7 1996 10 16 12 05 00 76.2470 -119.3533 35.00 30.00 5.00 75150 MBC 1996 08 30 17 07 00 1576-91 P co CCGG 104.120 -999.990 ... R7 1996 10 16 12 21 00 76.2470 -119.3533 35.00 30.00 5.00 75151 MBC 1996 09 03 13 36 00 1-91 P co CCGG 108.790 -999.990 ... R7 1996 10 16 10 17 00 76.2470 -119.3533 35.00 30.00 5.00 75152 MBC 1996 09 03 13 36 00 2-91 P co CCGG 108.350 -999.990 ... R7 1996 10 16 10 33 00 76.2470 -119.3533 35.00 30.00 5.00 75153 MBC 1996 09 06 17 57 00 267-91 P co CCGG 117.680 -999.990 P.. R7 1996 10 16 10 49 00 76.2470 -119.3533 35.00 30.00 5.00 75154 MBC 1996 09 06 17 57 00 268-91 P co CCGG 114.060 -999.990 P.. R7 1996 10 16 11 05 00 76.2470 -119.3533 35.00 30.00 5.00 75155 MBC 1996 09 10 13 56 00 329-91 P co CCGG 113.920 -999.990 ... R7 1996 10 10 13 34 00 76.2470 -119.3533 35.00 30.00 5.00 75156 MBC 1996 09 10 13 56 00 329-91 P co CCGG 116.710 -999.990 ... R7 1996 10 15 08 51 00 76.2470 -119.3533 35.00 30.00 5.00 75156 MBC 1996 09 13 13 16 00 65-91 P co CCGG 114.650 -999.990 ... R7 1996 10 15 10 12 00 76.2470 -119.3533 35.00 30.00 5.00 75158 MBC 1996 09 17 22 07 00 1995-91 P co CCGG 113.540 -999.990 ... R7 1996 10 15 12 21 00 76.2470 -119.3533 35.00 30.00 5.00 75159 MBC 1996 09 17 22 07 00 1996-91 P co CCGG 114.330 -999.990 ... R7 1996 10 15 12 37 00 76.2470 -119.3533 35.00 30.00 5.00 75160 MBC 1996 09 20 15 22 00 1993-91 P co CCGG 112.650 -999.990 ... R7 1996 10 15 12 53 00 76.2470 -119.3533 35.00 30.00 5.00 75161 MBC 1996 09 20 15 22 00 1994-91 P co CCGG 112.940 -999.990 ... R7 1996 10 15 13 10 00 76.2470 -119.3533 35.00 30.00 5.00 75162 MBC 1996 09 24 14 38 00 657-91 P co CCGG 114.680 -999.990 ... R7 1996 10 15 11 49 00 76.2470 -119.3533 35.00 30.00 5.00 75163 MBC 1996 09 24 14 38 00 658-91 P co CCGG 114.390 -999.990 ... R7 1996 10 15 12 05 00 76.2470 -119.3533 35.00 30.00 5.00 75164 MBC 1996 09 27 13 39 00 271-91 P co CCGG 115.750 -999.990 ... R7 1996 10 15 11 17 00 76.2470 -119.3533 35.00 30.00 5.00 75165 MBC 1996 09 27 13 39 00 272-91 P co CCGG 115.780 -999.990 ... R7 1996 10 15 11 33 00 76.2470 -119.3533 35.00 30.00 5.00 75166 MBC 1996 10 01 15 25 00 859-91 P co CCGG 115.040 -999.990 ... R7 1996 10 17 13 34 00 76.2470 -119.3533 35.00 30.00 5.00 75167 MBC 1996 10 01 15 25 00 860-91 P co CCGG 116.420 -999.990 ... R7 1996 10 17 13 50 00 76.2470 -119.3533 35.00 30.00 5.00 75168 MBC 1996 10 04 13 21 00 101-91 P co CCGG 113.980 -999.990 ... R7 1996 10 17 14 06 00 76.2470 -119.3533 35.00 30.00 5.00 75169 MBC 1996 10 04 13 21 00 102-91 P co CCGG 114.960 -999.990 ... R7 1996 10 17 14 23 00 76.2470 -119.3533 35.00 30.00 5.00 75170 MBC 1996 10 08 13 54 00 155-91 P co CCGG 116.770 -999.990 ... R7 1996 11 04 11 10 00 76.2470 -119.3533 35.00 30.00 5.00 75171 MBC 1996 10 08 13 54 00 156-91 P co CCGG 113.960 -999.990 ... R7 1996 11 04 11 26 00 76.2470 -119.3533 35.00 30.00 5.00 75172 MBC 1996 10 11 13 32 00 143-91 P co CCGG 113.690 -999.990 ... R7 1996 11 04 10 06 00 76.2470 -119.3533 35.00 30.00 5.00 75173 MBC 1996 10 11 13 32 00 144-91 P co CCGG 115.850 -999.990 ... R7 1996 11 04 10 22 00 76.2470 -119.3533 35.00 30.00 5.00 75174 MBC 1996 10 15 13 28 00 649-91 P co CCGG 115.700 -999.990 ... R7 1996 11 04 10 38 00 76.2470 -119.3533 35.00 30.00 5.00 75175 MBC 1996 10 15 13 28 00 649-91 P co CCGG 116.630 -999.990 ... R7 1996 11 04 15 12 00 76.2470 -119.3533 35.00 30.00 5.00 75175 MBC 1996 10 15 13 28 00 650-91 P co CCGG 114.990 -999.990 ... R7 1996 11 04 10 54 00 76.2470 -119.3533 35.00 30.00 5.00 75176 MBC 1996 10 15 13 28 00 650-91 P co CCGG 117.100 -999.990 ... R7 1996 11 04 15 28 00 76.2470 -119.3533 35.00 30.00 5.00 75176 MBC 1996 10 18 13 27 00 1281-91 P co CCGG 115.860 -999.990 ... R7 1996 11 04 08 51 00 76.2470 -119.3533 35.00 30.00 5.00 75177 MBC 1996 10 18 13 27 00 1282-91 P co CCGG 116.390 -999.990 ... R7 1996 11 04 09 07 00 76.2470 -119.3533 35.00 30.00 5.00 75178 MBC 1996 10 22 13 54 00 55-91 P co CCGG 119.650 -999.990 ... R7 1996 11 18 16 47 00 76.2470 -119.3533 35.00 30.00 5.00 75179 MBC 1996 10 22 13 54 00 56-91 P co CCGG 119.230 -999.990 ... R7 1996 11 18 17 03 00 76.2470 -119.3533 35.00 30.00 5.00 75180 MBC 1996 10 25 16 35 00 1571-91 P co CCGG 117.670 -999.990 ... R7 1996 11 18 17 19 00 76.2470 -119.3533 35.00 30.00 5.00 75181 MBC 1996 10 25 16 35 00 1572-91 P co CCGG 117.190 -999.990 ... R7 1996 11 18 17 35 00 76.2470 -119.3533 35.00 30.00 5.00 75182 MBC 1996 10 29 15 50 00 1579-91 P co CCGG 120.130 -999.990 ... R7 1996 11 29 14 32 00 76.2470 -119.3533 35.00 30.00 5.00 75183 MBC 1996 10 29 15 50 00 1580-91 P co CCGG 118.090 -999.990 ... R7 1996 11 29 14 48 00 76.2470 -119.3533 35.00 30.00 5.00 75184 MBC 1996 11 01 13 24 00 994-91 P co CCGG 116.320 -999.990 ... R7 1996 12 02 11 44 00 76.2470 -119.3533 35.00 30.00 5.00 75186 MBC 1996 11 06 14 40 00 1247-91 P co CCGG 118.710 -999.990 ... R7 1996 12 02 14 54 00 76.2470 -119.3533 35.00 30.00 5.00 75187 MBC 1996 11 06 14 40 00 1248-91 P co CCGG 119.230 -999.990 ... R7 1996 12 02 15 10 00 76.2470 -119.3533 35.00 30.00 5.00 75188 MBC 1996 11 10 19 07 00 1991-91 P co CCGG 120.960 -999.990 P.. R7 1996 11 29 13 25 00 76.2470 -119.3533 35.00 30.00 5.00 75189 MBC 1996 11 10 19 07 00 1992-91 P co CCGG 123.920 -999.990 P.. R7 1996 11 29 13 41 00 76.2470 -119.3533 35.00 30.00 5.00 75190 MBC 1996 11 13 15 37 00 1988-91 P co CCGG 121.340 -999.990 ... R7 1997 01 10 11 20 00 76.2470 -119.3533 35.00 30.00 5.00 75191 MBC 1996 11 13 15 37 00 1989-91 P co CCGG 121.280 -999.990 ... R7 1997 01 10 11 36 00 76.2470 -119.3533 35.00 30.00 5.00 75192 MBC 1996 11 16 19 57 00 1987-91 P co CCGG 137.720 -999.990 ... R7 1997 01 10 09 00 00 76.2470 -119.3533 35.00 30.00 5.00 75193 MBC 1996 11 16 19 57 00 1990-91 P co CCGG 137.270 -999.990 ... R7 1997 01 10 09 16 00 76.2470 -119.3533 35.00 30.00 5.00 75194 MBC 1996 11 19 17 53 00 607-91 P co CCGG 133.450 -999.990 ... R7 1997 01 10 08 28 00 76.2470 -119.3533 35.00 30.00 5.00 75195 MBC 1996 11 19 17 53 00 608-91 P co CCGG 132.300 -999.990 ... R7 1997 01 10 08 44 00 76.2470 -119.3533 35.00 30.00 5.00 75196 MBC 1996 11 22 13 58 00 1901-91 P co CCGG 134.410 -999.990 ... R7 1997 01 09 15 20 00 76.2470 -119.3533 35.00 30.00 5.00 75197 MBC 1996 11 22 13 58 00 1902-91 P co CCGG 133.920 -999.990 ... R7 1997 01 09 15 36 00 76.2470 -119.3533 35.00 30.00 5.00 75198 MBC 1996 11 26 14 04 00 627-91 P co CCGG 130.430 -999.990 ... R7 1997 01 10 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 75199 MBC 1996 11 26 14 04 00 628-91 P co CCGG 129.780 -999.990 ... R7 1997 01 10 13 20 00 76.2470 -119.3533 35.00 30.00 5.00 75200 MBC 1996 11 29 13 54 00 87-91 P co CCGG 143.460 -999.990 ... R7 1997 01 10 12 32 00 76.2470 -119.3533 35.00 30.00 5.00 75201 MBC 1996 11 29 13 54 00 88-91 P co CCGG 143.150 -999.990 ... R7 1997 01 10 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 75202 MBC 1996 12 03 13 53 00 1255-91 P co CCGG 140.450 -999.990 ... R7 1997 01 10 14 15 00 76.2470 -119.3533 35.00 30.00 5.00 75203 MBC 1996 12 03 13 53 00 1256-91 P co CCGG 140.500 -999.990 ... R7 1997 01 10 14 32 00 76.2470 -119.3533 35.00 30.00 5.00 75204 MBC 1996 12 06 19 02 00 1063-91 P co CCGG 140.560 -999.990 ... R7 1997 01 10 14 48 00 76.2470 -119.3533 35.00 30.00 5.00 75205 MBC 1996 12 06 19 02 00 1064-91 P co CCGG 139.840 -999.990 ... R7 1997 01 10 15 04 00 76.2470 -119.3533 35.00 30.00 5.00 75206 MBC 1996 12 10 18 26 00 387-91 P co CCGG 134.420 -999.990 ... R7 1997 01 10 12 00 00 76.2470 -119.3533 35.00 30.00 5.00 75207 MBC 1996 12 10 18 26 00 388-91 P co CCGG 133.430 -999.990 ... R7 1997 01 10 12 16 00 76.2470 -119.3533 35.00 30.00 5.00 75208 MBC 1996 12 13 18 30 00 847-91 P co CCGG 132.780 -999.990 P.. R7 1997 01 10 10 48 00 76.2470 -119.3533 35.00 30.00 5.00 75209 MBC 1996 12 13 18 30 00 848-91 P co CCGG 136.690 -999.990 P.. R7 1997 01 10 11 04 00 76.2470 -119.3533 35.00 30.00 5.00 75210 MBC 1996 12 20 13 25 00 195-91 P co CCGG 138.450 -999.990 ... R7 1997 02 04 10 10 00 76.2470 -119.3533 35.00 30.00 5.00 75211 MBC 1996 12 20 13 25 00 196-91 P co CCGG -999.990 -999.990 *.. R7 1997 02 04 10 26 00 76.2470 -119.3533 35.00 30.00 5.00 75212 MBC 1996 12 24 12 41 00 721-91 P co CCGG 138.130 -999.990 ... R7 1997 02 03 16 44 00 76.2470 -119.3533 35.00 30.00 5.00 75213 MBC 1996 12 24 12 41 00 722-91 P co CCGG 139.280 -999.990 ... R7 1997 02 03 17 00 00 76.2470 -119.3533 35.00 30.00 5.00 75214 MBC 1996 12 28 16 25 00 117-91 P co CCGG 143.950 -999.990 ... R7 1997 02 03 12 47 00 76.2470 -119.3533 35.00 30.00 5.00 75215 MBC 1996 12 28 16 25 00 118-91 P co CCGG 145.540 -999.990 ... R7 1997 02 03 13 03 00 76.2470 -119.3533 35.00 30.00 5.00 75216 MBC 1996 12 31 14 14 00 1041-91 P co CCGG 155.540 -999.990 ... R7 1997 02 03 13 19 00 76.2470 -119.3533 35.00 30.00 5.00 75217 MBC 1996 12 31 14 14 00 1042-91 P co CCGG 154.420 -999.990 ... R7 1997 02 03 13 35 00 76.2470 -119.3533 35.00 30.00 5.00 75218 MBC 1997 01 03 17 25 00 193-91 P co CCGG 152.930 -999.990 P.. R7 1997 02 03 13 57 00 76.2470 -119.3533 35.00 30.00 5.00 75219 MBC 1997 01 03 17 25 00 194-91 P co CCGG 157.710 -999.990 P.. R7 1997 02 03 14 13 00 76.2470 -119.3533 35.00 30.00 5.00 75220 MBC 1997 01 07 01 35 00 113-91 P co CCGG 183.670 -999.990 .X. R7 1997 03 06 13 53 00 76.2470 -119.3533 35.00 30.00 5.00 75221 MBC 1997 01 07 01 35 00 114-91 P co CCGG 181.690 -999.990 .X. R7 1997 03 06 14 09 00 76.2470 -119.3533 35.00 30.00 5.00 75222 MBC 1997 01 08 00 13 00 1823-91 P co CCGG 150.190 -999.990 ... R7 1997 02 03 14 29 00 76.2470 -119.3533 35.00 30.00 5.00 75223 MBC 1997 01 08 00 13 00 1824-91 P co CCGG 149.280 -999.990 ... R7 1997 02 03 14 45 00 76.2470 -119.3533 35.00 30.00 5.00 75224 MBC 1997 01 10 10 04 00 505-91 P co CCGG 161.050 -999.990 ... R7 1997 02 28 18 32 00 76.2470 -119.3533 35.00 30.00 5.00 75225 MBC 1997 01 10 10 04 00 506-91 P co CCGG 160.810 -999.990 ... R7 1997 02 28 18 48 00 76.2470 -119.3533 35.00 30.00 5.00 75226 MBC 1997 01 14 22 25 00 1811-91 P co CCGG 193.150 -999.990 .X. R7 1997 02 28 17 28 00 76.2470 -119.3533 35.00 30.00 5.00 75227 MBC 1997 01 14 22 25 00 1812-91 P co CCGG 194.870 -999.990 .X. R7 1997 02 28 17 44 00 76.2470 -119.3533 35.00 30.00 5.00 75228 MBC 1997 01 17 19 35 00 981-91 P co CCGG 168.690 -999.990 ... R7 1997 02 26 14 51 00 76.2470 -119.3533 35.00 30.00 5.00 75229 MBC 1997 01 17 19 35 00 982-91 P co CCGG 166.360 -999.990 ... R7 1997 02 26 15 07 00 76.2470 -119.3533 35.00 30.00 5.00 75230 MBC 1997 01 18 19 20 00 1416-91 P co CCGG 208.840 -999.990 .X. R7 1997 03 07 10 01 00 76.2470 -119.3533 35.00 30.00 5.00 75231 MBC 1997 01 18 22 12 00 359-91 P co CCGG 207.870 -999.990 .X. R5 1998 02 06 15 53 00 76.2470 -119.3533 35.00 30.00 5.00 75232 MBC 1997 01 18 22 12 00 360-91 P co CCGG 208.180 -999.990 .X. R5 1998 02 06 16 06 00 76.2470 -119.3533 35.00 30.00 5.00 75233 MBC 1997 01 28 21 00 00 709-91 P co CCGG 163.580 -999.990 ... R7 1997 02 26 14 07 00 76.2470 -119.3533 35.00 30.00 5.00 75234 MBC 1997 01 28 21 00 00 710-91 P co CCGG 164.380 -999.990 ... R7 1997 02 26 14 23 00 76.2470 -119.3533 35.00 30.00 5.00 75235 MBC 1997 02 11 20 19 00 1441-91 P co CCGG 164.310 -999.990 ... R7 1997 03 06 14 25 00 76.2470 -119.3533 35.00 30.00 5.00 75236 MBC 1997 02 11 20 19 00 1442-91 P co CCGG 166.400 -999.990 ... R7 1997 03 06 14 41 00 76.2470 -119.3533 35.00 30.00 5.00 75237 MBC 1997 02 14 01 15 00 69-91 P co CCGG 164.210 -999.990 ... R7 1997 03 06 14 57 00 76.2470 -119.3533 35.00 30.00 5.00 75238 MBC 1997 02 14 01 15 00 70-91 P co CCGG 164.320 -999.990 ... R7 1997 03 06 15 13 00 76.2470 -119.3533 35.00 30.00 5.00 75239 MBC 1997 02 23 21 45 00 1735-91 P co CCGG 203.480 -999.990 P.. R5 1998 02 06 16 20 00 76.2470 -119.3533 35.00 30.00 5.00 75240 MBC 1997 02 23 21 45 00 1736-91 P co CCGG 199.090 -999.990 P.. R5 1998 02 06 16 34 00 76.2470 -119.3533 35.00 30.00 5.00 75241 MBC 1997 02 25 22 10 00 1583-91 P co CCGG 176.420 -999.990 ... R5 1998 02 05 14 19 00 76.2470 -119.3533 35.00 30.00 5.00 75242 MBC 1997 02 25 22 10 00 1584-91 P co CCGG 176.040 -999.990 ... R5 1998 02 05 14 33 00 76.2470 -119.3533 35.00 30.00 5.00 75243 MBC 1997 03 06 00 35 00 1487-91 P co CCGG 189.460 -999.990 ... R5 1998 02 05 14 46 00 76.2470 -119.3533 35.00 30.00 5.00 75244 MBC 1997 03 06 00 35 00 1488-91 P co CCGG 189.830 -999.990 ... R5 1998 02 05 15 00 00 76.2470 -119.3533 35.00 30.00 5.00 75245 MBC 1997 03 11 23 50 00 611-91 P co CCGG 166.330 -999.990 ... R5 1998 02 06 12 41 00 76.2470 -119.3533 35.00 30.00 5.00 75246 MBC 1997 03 11 23 50 00 612-91 P co CCGG 166.840 -999.990 ... R5 1998 02 06 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 75247 MBC 1997 03 14 20 30 00 1033-91 P co CCGG 169.620 -999.990 ... R5 1998 02 06 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 75248 MBC 1997 03 14 20 30 00 1034-91 P co CCGG 170.640 -999.990 ... R5 1998 02 06 13 50 00 76.2470 -119.3533 35.00 30.00 5.00 75249 MBC 1997 03 18 21 36 00 547-91 P co CCGG 186.840 -999.990 ... R5 1998 02 06 10 21 00 76.2470 -119.3533 35.00 30.00 5.00 75250 MBC 1997 03 18 21 36 00 548-91 P co CCGG 185.430 -999.990 ... R5 1998 02 06 10 34 00 76.2470 -119.3533 35.00 30.00 5.00 75251 MBC 1997 03 22 22 40 00 1143-91 P co CCGG 178.610 -999.990 ... R5 1998 02 06 09 26 00 76.2470 -119.3533 35.00 30.00 5.00 75252 MBC 1997 03 22 22 40 00 1144-91 P co CCGG 177.210 -999.990 ... R5 1998 02 06 09 40 00 76.2470 -119.3533 35.00 30.00 5.00 75253 MBC 1997 03 26 19 23 00 445-91 P co CCGG 185.650 -999.990 ... R5 1998 02 06 09 53 00 76.2470 -119.3533 35.00 30.00 5.00 75254 MBC 1997 03 26 19 23 00 446-91 P co CCGG 185.050 -999.990 ... R5 1998 02 06 10 07 00 76.2470 -119.3533 35.00 30.00 5.00 75255 MBC 1997 03 28 20 06 00 1607-91 P co CCGG 182.140 -999.990 ... R5 1998 02 05 13 51 00 76.2470 -119.3533 35.00 30.00 5.00 75256 MBC 1997 03 28 20 06 00 1608-91 P co CCGG 181.180 -999.990 ... R5 1998 02 05 14 05 00 76.2470 -119.3533 35.00 30.00 5.00 75257 MBC 1997 04 01 20 56 00 655-91 P co CCGG 176.440 -999.990 ... R5 1998 02 05 12 55 00 76.2470 -119.3533 35.00 30.00 5.00 75258 MBC 1997 04 01 20 56 00 656-91 P co CCGG 175.890 -999.990 ... R5 1998 02 05 13 09 00 76.2470 -119.3533 35.00 30.00 5.00 75259 MBC 1997 04 05 21 18 00 1697-91 P co CCGG 181.370 -999.990 ... R5 1998 02 05 12 00 00 76.2470 -119.3533 35.00 30.00 5.00 75260 MBC 1997 04 05 21 18 00 1698-91 P co CCGG 180.480 -999.990 ... R5 1998 02 05 12 14 00 76.2470 -119.3533 35.00 30.00 5.00 75261 MBC 1997 04 08 21 46 00 1649-91 P co CCGG 170.450 -999.990 ... R5 1998 02 05 12 27 00 76.2470 -119.3533 35.00 30.00 5.00 75262 MBC 1997 04 08 21 46 00 1650-91 P co CCGG 171.060 -999.990 ... R5 1998 02 05 12 41 00 76.2470 -119.3533 35.00 30.00 5.00 75263 MBC 1997 04 12 18 57 00 4165-91 P co CCGG 172.030 -999.990 ... R5 1998 02 06 14 58 00 76.2470 -119.3533 35.00 30.00 5.00 75264 MBC 1997 04 12 18 57 00 4166-91 P co CCGG 171.510 -999.990 ... R5 1998 02 06 15 12 00 76.2470 -119.3533 35.00 30.00 5.00 75265 MBC 1997 04 15 19 50 00 1209-91 P co CCGG 170.400 -999.990 ... R5 1998 02 06 15 25 00 76.2470 -119.3533 35.00 30.00 5.00 75266 MBC 1997 04 15 19 50 00 1210-91 P co CCGG -999.990 -999.990 *.. R5 1998 02 06 15 39 00 76.2470 -119.3533 35.00 30.00 5.00 75267 MBC 1997 04 18 19 25 00 629-91 P co CCGG 171.020 -999.990 ... R5 1998 02 05 13 22 00 76.2470 -119.3533 35.00 30.00 5.00 75268 MBC 1997 04 18 19 25 00 630-91 P co CCGG -999.990 -999.990 *.. R5 1998 02 05 13 36 00 76.2470 -119.3533 35.00 30.00 5.00 75269 MBC 1997 04 23 19 47 00 1801-91 P co CCGG 170.290 -999.990 ... R5 1998 02 05 11 17 00 76.2470 -119.3533 35.00 30.00 5.00 75270 MBC 1997 04 23 19 47 00 1802-91 P co CCGG 169.890 -999.990 ... R5 1998 02 05 11 31 00 76.2470 -119.3533 35.00 30.00 5.00 75271 MBC 1997 04 26 21 39 00 369-91 P co CCGG 167.390 -999.990 ... R7 1997 07 16 12 16 00 76.2470 -119.3533 35.00 30.00 5.00 75272 MBC 1997 04 26 21 39 00 370-91 P co CCGG 166.840 -999.990 ... R7 1997 07 16 12 32 00 76.2470 -119.3533 35.00 30.00 5.00 75273 MBC 1997 04 29 17 00 00 1690-91 P co CCGG 156.470 -999.990 ... R7 1997 07 16 13 04 00 76.2470 -119.3533 35.00 30.00 5.00 75274 MBC 1997 05 02 13 48 00 717-91 P co CCGG 161.900 -999.990 ... R7 1997 07 17 15 28 00 76.2470 -119.3533 35.00 30.00 5.00 75275 MBC 1997 05 02 13 48 00 718-91 P co CCGG 160.920 -999.990 ... R7 1997 07 17 15 44 00 76.2470 -119.3533 35.00 30.00 5.00 75276 MBC 1997 05 06 13 09 00 667-91 P co CCGG 157.750 -999.990 ... R7 1997 07 17 16 00 00 76.2470 -119.3533 35.00 30.00 5.00 75277 MBC 1997 05 06 13 09 00 668-91 P co CCGG 156.730 -999.990 ... R7 1997 07 17 16 16 00 76.2470 -119.3533 35.00 30.00 5.00 75278 MBC 1997 05 09 13 28 00 1763-91 P co CCGG 146.710 -999.990 *.. R7 1997 07 21 10 35 00 76.2470 -119.3533 35.00 30.00 5.00 75279 MBC 1997 05 13 17 57 00 1315-91 P co CCGG 142.500 -999.990 ... R7 1997 07 17 14 56 00 76.2470 -119.3533 35.00 30.00 5.00 75280 MBC 1997 05 13 17 57 00 1316-91 P co CCGG 144.740 -999.990 ... R7 1997 07 17 15 12 00 76.2470 -119.3533 35.00 30.00 5.00 75281 MBC 1997 05 16 14 34 00 6737-66 P co CCGG 144.950 -999.990 ... R7 1997 07 16 12 48 00 76.2470 -119.3533 35.00 30.00 5.00 75282 MBC 1997 05 16 18 05 00 6053-66 P co CCGG 145.640 -999.990 ... R7 1997 07 16 11 44 00 76.2470 -119.3533 35.00 30.00 5.00 75283 MBC 1997 05 16 18 05 00 6054-66 P co CCGG 145.420 -999.990 ... R7 1997 07 16 12 00 00 76.2470 -119.3533 35.00 30.00 5.00 75284 MBC 1997 05 26 20 20 00 6427-66 P co CCGG 134.120 -999.990 P.. R5 1997 09 05 08 28 00 76.2470 -119.3533 35.00 30.00 5.00 75285 MBC 1997 05 26 20 20 00 6428-66 P co CCGG 137.100 -999.990 P.. R5 1997 09 05 08 42 00 76.2470 -119.3533 35.00 30.00 5.00 75286