# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Kazakh Scientific Institute of Environmental # collaborator_name: Monitoring and Climate # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: kzd # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-08-31 16:44:37 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number KZD 1997 10 12 07 30 00 63-91 P co CCGG 120.920 -999.990 ... R5 1997 11 06 13 53 00 44.4500 75.5700 412.00 407.00 5.00 69623 KZD 1997 10 12 07 30 00 64-91 P co CCGG 121.300 -999.990 ... R5 1997 11 06 14 06 00 44.4500 75.5700 412.00 407.00 5.00 69624 KZD 1997 10 18 06 30 00 4203-91 P co CCGG 141.230 -999.990 ... R5 1997 11 06 11 37 00 44.4500 75.5700 412.00 407.00 5.00 69625 KZD 1997 10 18 06 30 00 4204-91 P co CCGG 142.740 -999.990 ... R5 1997 11 06 11 50 00 44.4500 75.5700 412.00 407.00 5.00 69626 KZD 1997 10 25 06 45 00 4446-91 P co CCGG 183.280 -999.990 ... R5 1997 11 25 10 17 00 44.4500 75.5700 412.00 407.00 5.00 69627 KZD 1997 11 01 07 50 00 335-91 P co CCGG 216.460 -999.990 ... R5 1997 11 25 09 24 00 44.4500 75.5700 412.00 407.00 5.00 69628 KZD 1997 11 01 07 50 00 336-91 P co CCGG 217.770 -999.990 ... R5 1997 11 25 09 37 00 44.4500 75.5700 412.00 407.00 5.00 69629 KZD 1997 11 22 06 40 00 71-91 P co CCGG 154.380 -999.990 P.. R5 1997 12 22 10 35 00 44.4500 75.5700 412.00 407.00 5.00 69630 KZD 1997 11 22 06 40 00 72-91 P co CCGG 159.830 -999.990 P.. R5 1997 12 22 10 48 00 44.4500 75.5700 412.00 407.00 5.00 69631 KZD 1997 11 29 06 35 00 1741-91 P co CCGG 243.760 -999.990 ..C R5 1997 12 22 11 01 00 44.4500 75.5700 412.00 407.00 5.00 69632 KZD 1997 11 29 06 35 00 1742-91 P co CCGG 244.060 -999.990 ..C R5 1997 12 22 11 15 00 44.4500 75.5700 412.00 407.00 5.00 69633 KZD 1997 12 06 06 05 00 63-91 P co CCGG 220.910 -999.990 ... R5 1998 01 16 16 26 00 44.4500 75.5700 412.00 407.00 5.00 69634 KZD 1997 12 06 06 05 00 64-91 P co CCGG 220.590 -999.990 ... R5 1998 01 16 16 40 00 44.4500 75.5700 412.00 407.00 5.00 69635 KZD 1997 12 14 06 35 00 511-91 P co CCGG 279.050 -999.990 ..C R5 1998 01 20 10 25 00 44.4500 75.5700 412.00 407.00 5.00 69636 KZD 1997 12 14 06 35 00 512-91 P co CCGG 278.890 -999.990 ..C R5 1998 01 20 10 39 00 44.4500 75.5700 412.00 407.00 5.00 69637 KZD 1997 12 20 07 15 00 539-91 P co CCGG 242.430 -999.990 ..C R5 1998 01 30 11 55 00 44.4500 75.5700 412.00 407.00 5.00 69638 KZD 1997 12 20 07 15 00 540-91 P co CCGG 240.260 -999.990 ..C R5 1998 01 30 12 09 00 44.4500 75.5700 412.00 407.00 5.00 69639 KZD 1997 12 27 05 55 00 4441-91 P co CCGG 231.310 -999.990 ..C R5 1998 01 30 11 28 00 44.4500 75.5700 412.00 407.00 5.00 69640 KZD 1997 12 27 05 55 00 4442-91 P co CCGG 231.170 -999.990 ..C R5 1998 01 30 11 42 00 44.4500 75.5700 412.00 407.00 5.00 69641 KZD 1998 01 03 07 20 00 4707-91 P co CCGG 311.150 -999.990 .XC R5 1998 02 06 11 17 00 44.4500 75.5700 412.00 407.00 5.00 69642 KZD 1998 01 03 07 20 00 4708-91 P co CCGG 310.320 -999.990 .XC R5 1998 02 06 11 31 00 44.4500 75.5700 412.00 407.00 5.00 69643 KZD 1998 01 10 06 10 00 1119-91 P co CCGG 181.980 -999.990 ... R5 1998 02 06 10 50 00 44.4500 75.5700 412.00 407.00 5.00 69644 KZD 1998 01 10 06 10 00 1120-91 P co CCGG 182.000 -999.990 ... R5 1998 02 06 11 03 00 44.4500 75.5700 412.00 407.00 5.00 69645 KZD 1998 01 17 06 55 00 1197-91 P co CCGG 252.720 -999.990 P.C R5 1998 03 03 12 58 00 44.4500 75.5700 412.00 407.00 5.00 69646 KZD 1998 01 17 06 55 00 1198-91 P co CCGG 386.270 -999.990 P.C R5 1998 03 03 13 12 00 44.4500 75.5700 412.00 407.00 5.00 69647 KZD 1998 01 24 07 25 00 75-91 P co CCGG 345.490 -999.990 .XC R5 1998 03 03 12 31 00 44.4500 75.5700 412.00 407.00 5.00 69648 KZD 1998 01 24 07 25 00 76-91 P co CCGG 346.860 -999.990 .XC R5 1998 03 03 12 45 00 44.4500 75.5700 412.00 407.00 5.00 69649 KZD 1998 01 31 06 35 00 1199-91 P co CCGG 416.640 -999.990 .XC R5 1998 03 04 14 49 00 44.4500 75.5700 412.00 407.00 5.00 69650 KZD 1998 01 31 06 35 00 1200-91 P co CCGG 419.210 -999.990 .XC R5 1998 03 04 15 02 00 44.4500 75.5700 412.00 407.00 5.00 69651 KZD 1998 02 07 06 55 00 4093-91 P co CCGG 215.470 -999.990 ... R5 1998 03 04 14 21 00 44.4500 75.5700 412.00 407.00 5.00 69652 KZD 1998 02 07 06 55 00 4094-91 P co CCGG 213.800 -999.990 ... R5 1998 03 04 14 35 00 44.4500 75.5700 412.00 407.00 5.00 69653 KZD 1998 02 14 06 05 00 1621-91 P co CCGG 207.960 -999.990 ... R5 1998 03 13 14 57 00 44.4500 75.5700 412.00 407.00 5.00 69654 KZD 1998 02 14 06 05 00 1622-91 P co CCGG 206.620 -999.990 ... R5 1998 03 13 15 11 00 44.4500 75.5700 412.00 407.00 5.00 69655 KZD 1998 02 21 05 55 00 4441-91 P co CCGG 233.100 -999.990 ..C R5 1998 03 13 16 20 00 44.4500 75.5700 412.00 407.00 5.00 69656 KZD 1998 02 21 05 55 00 4442-91 P co CCGG 233.860 -999.990 ..C R5 1998 03 13 16 34 00 44.4500 75.5700 412.00 407.00 5.00 69657 KZD 1998 02 28 06 10 00 1001-91 P co CCGG 191.440 -999.990 ... R5 1998 03 24 14 11 00 44.4500 75.5700 412.00 407.00 5.00 69658 KZD 1998 02 28 06 10 00 1002-91 P co CCGG 189.620 -999.990 ... R5 1998 03 24 14 25 00 44.4500 75.5700 412.00 407.00 5.00 69659 KZD 1998 03 07 05 50 00 1075-91 P co CCGG 217.700 -999.990 ... R5 1998 03 24 14 38 00 44.4500 75.5700 412.00 407.00 5.00 69660 KZD 1998 03 07 05 50 00 1076-91 P co CCGG 217.410 -999.990 ... R5 1998 03 24 14 52 00 44.4500 75.5700 412.00 407.00 5.00 69661 KZD 1998 03 15 04 45 00 127-91 P co CCGG 235.740 -999.990 ..C R5 1998 04 07 09 57 00 44.4500 75.5700 412.00 407.00 5.00 69662 KZD 1998 03 15 04 45 00 128-91 P co CCGG 234.390 -999.990 ..C R5 1998 04 07 10 11 00 44.4500 75.5700 412.00 407.00 5.00 69663 KZD 1998 03 21 05 45 00 1862-91 P co CCGG 199.680 -999.990 ... R5 1998 04 07 12 18 00 44.4500 75.5700 412.00 407.00 5.00 69664 KZD 1998 03 29 04 55 00 847-91 P co CCGG 192.130 -999.990 ... R5 1998 04 21 15 33 00 44.4500 75.5700 412.00 407.00 5.00 69665 KZD 1998 03 29 04 55 00 848-91 P co CCGG 192.400 -999.990 ... R5 1998 04 21 15 47 00 44.4500 75.5700 412.00 407.00 5.00 69666 KZD 1998 04 04 05 50 00 379-91 P co CCGG 185.890 -999.990 ... R5 1998 04 21 16 00 00 44.4500 75.5700 412.00 407.00 5.00 69667 KZD 1998 04 04 05 50 00 380-91 P co CCGG 184.460 -999.990 ... R5 1998 04 21 16 14 00 44.4500 75.5700 412.00 407.00 5.00 69668 KZD 1998 04 12 06 10 00 473-91 P co CCGG 180.060 -999.990 ... R5 1998 05 11 11 46 00 44.4500 75.5700 412.00 407.00 5.00 69669 KZD 1998 04 18 05 55 00 981-91 P co CCGG 187.570 -999.990 ... R5 1998 05 11 09 28 00 44.4500 75.5700 412.00 407.00 5.00 69670 KZD 1998 04 18 05 55 00 982-91 P co CCGG 185.670 -999.990 ... R5 1998 05 11 09 42 00 44.4500 75.5700 412.00 407.00 5.00 69671 KZD 1998 04 27 05 30 00 185-91 P co CCGG 161.640 -999.990 ... R5 1998 06 02 16 02 00 44.4500 75.5700 412.00 407.00 5.00 69672 KZD 1998 04 27 05 30 00 4442-91 P co CCGG 159.330 -999.990 ... R5 1998 06 02 16 16 00 44.4500 75.5700 412.00 407.00 5.00 69673 KZD 1998 05 04 05 50 00 186-91 P co CCGG 175.020 -999.990 ... R5 1998 06 04 15 31 00 44.4500 75.5700 412.00 407.00 5.00 69674 KZD 1998 05 04 05 50 00 4441-91 P co CCGG 175.330 -999.990 ... R5 1998 06 04 15 17 00 44.4500 75.5700 412.00 407.00 5.00 69675 KZD 1998 05 08 05 50 00 1901-91 P co CCGG 180.990 -999.990 ... R5 1998 06 12 10 41 00 44.4500 75.5700 412.00 407.00 5.00 69676 KZD 1998 05 08 05 50 00 1902-91 P co CCGG 179.270 -999.990 ... R5 1998 06 12 10 55 00 44.4500 75.5700 412.00 407.00 5.00 69677 KZD 1998 05 16 06 50 00 1225-91 P co CCGG 141.900 -999.990 ... R5 1998 06 12 11 08 00 44.4500 75.5700 412.00 407.00 5.00 69678 KZD 1998 05 16 06 50 00 1226-91 P co CCGG 142.800 -999.990 ... R5 1998 06 12 11 22 00 44.4500 75.5700 412.00 407.00 5.00 69679 KZD 1998 05 23 05 30 00 4551-91 P co CCGG 159.410 -999.990 P.. R5 1998 06 12 11 36 00 44.4500 75.5700 412.00 407.00 5.00 69680 KZD 1998 05 23 05 30 00 4552-91 P co CCGG 154.180 -999.990 P.. R5 1998 06 12 11 49 00 44.4500 75.5700 412.00 407.00 5.00 69681 KZD 1998 05 30 06 35 00 4237-91 P co CCGG 151.850 -999.990 ... R5 1998 06 12 12 03 00 44.4500 75.5700 412.00 407.00 5.00 69682 KZD 1998 05 30 06 35 00 4238-91 P co CCGG 152.430 -999.990 ... R5 1998 06 12 12 17 00 44.4500 75.5700 412.00 407.00 5.00 69683 KZD 1998 06 05 05 40 00 1247-91 P co CCGG 149.620 -999.990 ... R5 1998 06 30 14 01 00 44.4500 75.5700 412.00 407.00 5.00 69684 KZD 1998 06 05 05 40 00 1248-91 P co CCGG 151.180 -999.990 ... R5 1998 06 30 14 15 00 44.4500 75.5700 412.00 407.00 5.00 69685 KZD 1998 06 12 05 15 00 1257-91 P co CCGG 133.900 -999.990 ... R5 1998 06 30 13 34 00 44.4500 75.5700 412.00 407.00 5.00 69686 KZD 1998 06 12 05 15 00 1258-91 P co CCGG 133.570 -999.990 ... R5 1998 06 30 13 47 00 44.4500 75.5700 412.00 407.00 5.00 69687 KZD 1998 06 20 05 25 00 4603-91 D co CCGG 135.210 -999.990 ... R5 1998 07 24 14 11 00 44.4500 75.5700 412.00 407.00 5.00 69688 KZD 1998 06 20 05 25 00 4604-91 D co CCGG 135.980 -999.990 ... R5 1998 07 24 14 24 00 44.4500 75.5700 412.00 407.00 5.00 69689 KZD 1998 06 27 06 00 00 149-91 D co CCGG 149.420 -999.990 P.. R5 1998 07 24 13 43 00 44.4500 75.5700 412.00 407.00 5.00 69690 KZD 1998 06 27 06 00 00 150-91 D co CCGG 153.510 -999.990 P.. R5 1998 07 24 13 57 00 44.4500 75.5700 412.00 407.00 5.00 69691 KZD 1998 07 04 05 20 00 691-91 D co CCGG 129.260 -999.990 ... R5 1998 08 06 09 48 00 44.4500 75.5700 412.00 407.00 5.00 69692 KZD 1998 07 04 05 20 00 692-91 D co CCGG 128.830 -999.990 ... R5 1998 08 06 10 02 00 44.4500 75.5700 412.00 407.00 5.00 69693 KZD 1998 07 11 06 50 00 157-91 D co CCGG 145.180 -999.990 ... R5 1998 08 05 15 59 00 44.4500 75.5700 412.00 407.00 5.00 69694 KZD 1998 07 11 06 50 00 158-91 D co CCGG 145.830 -999.990 ... R5 1998 08 05 16 12 00 44.4500 75.5700 412.00 407.00 5.00 69695 KZD 1998 07 18 05 15 00 1587-91 D co CCGG 153.150 -999.990 ... R5 1998 08 13 15 02 00 44.4500 75.5700 412.00 407.00 5.00 69696 KZD 1998 07 18 05 15 00 1588-91 D co CCGG 151.370 -999.990 ... R5 1998 08 13 15 16 00 44.4500 75.5700 412.00 407.00 5.00 69697 KZD 1998 07 25 05 30 00 4731-91 D co CCGG 129.230 -999.990 P.. R5 1998 08 13 15 29 00 44.4500 75.5700 412.00 407.00 5.00 69698 KZD 1998 07 25 05 30 00 4732-91 D co CCGG 132.340 -999.990 P.. R5 1998 08 13 15 43 00 44.4500 75.5700 412.00 407.00 5.00 69699 KZD 1998 08 01 05 17 00 21-91 D co CCGG 191.300 -999.990 ... R5 1998 08 27 10 17 00 44.4500 75.5700 412.00 407.00 5.00 69700 KZD 1998 08 01 05 17 00 22-91 D co CCGG 191.440 -999.990 ... R5 1998 08 27 10 30 00 44.4500 75.5700 412.00 407.00 5.00 69701 KZD 1998 08 08 05 35 00 4668-91 D co CCGG 140.360 -999.990 ... R5 1998 08 26 16 21 00 44.4500 75.5700 412.00 407.00 5.00 69702 KZD 1998 08 15 06 10 00 981-91 D co CCGG 134.870 -999.990 ... R5 1998 09 11 13 16 00 44.4500 75.5700 412.00 407.00 5.00 69703 KZD 1998 08 15 06 10 00 982-91 D co CCGG 133.690 -999.990 ... R5 1998 09 11 13 30 00 44.4500 75.5700 412.00 407.00 5.00 69704 KZD 1998 08 22 06 05 00 539-91 D co CCGG 141.070 -999.990 P.. R5 1998 09 11 12 49 00 44.4500 75.5700 412.00 407.00 5.00 69705 KZD 1998 08 22 06 05 00 540-91 D co CCGG 135.900 -999.990 P.. R5 1998 09 11 13 02 00 44.4500 75.5700 412.00 407.00 5.00 69706 KZD 1998 08 29 04 55 00 2021-91 D co CCGG 143.500 -999.990 ... R5 1998 09 28 13 54 00 44.4500 75.5700 412.00 407.00 5.00 69707 KZD 1998 08 29 04 55 00 2022-91 D co CCGG 145.400 -999.990 ... R5 1998 09 28 14 08 00 44.4500 75.5700 412.00 407.00 5.00 69708 KZD 1998 09 05 06 10 00 4817-91 D co CCGG 164.600 -999.990 ... R5 1998 09 28 13 27 00 44.4500 75.5700 412.00 407.00 5.00 69709 KZD 1998 09 05 06 10 00 4818-91 D co CCGG 162.690 -999.990 ... R5 1998 09 28 13 40 00 44.4500 75.5700 412.00 407.00 5.00 69710 KZD 1998 09 12 05 03 00 4711-91 D co CCGG 158.180 -999.990 ... R5 1998 10 20 16 50 00 44.4500 75.5700 412.00 407.00 5.00 69711 KZD 1998 09 12 05 03 00 4712-91 D co CCGG 159.790 -999.990 ... R5 1998 10 20 17 03 00 44.4500 75.5700 412.00 407.00 5.00 69712 KZD 1998 09 19 05 05 00 1127-91 D co CCGG 153.080 -999.990 ... R5 1998 10 20 15 28 00 44.4500 75.5700 412.00 407.00 5.00 69713 KZD 1998 09 19 05 05 00 1128-91 D co CCGG 152.700 -999.990 ... R5 1998 10 20 15 41 00 44.4500 75.5700 412.00 407.00 5.00 69714 KZD 1998 09 26 05 00 00 4021-91 D co CCGG 182.010 -999.990 ... R5 1998 10 30 16 06 00 44.4500 75.5700 412.00 407.00 5.00 69715 KZD 1998 09 26 05 00 00 4022-91 D co CCGG 180.970 -999.990 ... R5 1998 10 30 16 20 00 44.4500 75.5700 412.00 407.00 5.00 69716 KZD 1998 10 03 04 55 00 1051-91 D co CCGG 183.490 -999.990 ... R5 1998 10 30 14 44 00 44.4500 75.5700 412.00 407.00 5.00 69717 KZD 1998 10 03 04 55 00 1052-91 D co CCGG 183.140 -999.990 ... R5 1998 10 30 14 58 00 44.4500 75.5700 412.00 407.00 5.00 69718 KZD 1998 10 10 05 25 00 4713-91 D co CCGG 184.310 -999.990 ... R5 1998 11 09 09 29 00 44.4500 75.5700 412.00 407.00 5.00 69719 KZD 1998 10 10 05 25 00 4714-91 D co CCGG 185.030 -999.990 ... R5 1998 11 09 09 42 00 44.4500 75.5700 412.00 407.00 5.00 69720 KZD 1998 10 17 05 15 00 4297-91 D co CCGG 167.810 -999.990 ... R5 1998 11 09 10 23 00 44.4500 75.5700 412.00 407.00 5.00 69721 KZD 1998 10 17 05 15 00 4298-91 D co CCGG 167.620 -999.990 ... R5 1998 11 09 10 37 00 44.4500 75.5700 412.00 407.00 5.00 69722 KZD 1998 10 24 05 25 00 1857-91 D co CCGG 169.280 -999.990 ... R5 1998 11 17 11 56 00 44.4500 75.5700 412.00 407.00 5.00 69724 KZD 1998 10 24 05 25 00 45-98 D co CCGG 167.890 -999.990 ... R5 1998 11 17 11 43 00 44.4500 75.5700 412.00 407.00 5.00 69723 KZD 1998 10 31 05 50 00 4707-91 D co CCGG 218.080 -999.990 ... R5 1998 11 17 14 28 00 44.4500 75.5700 412.00 407.00 5.00 69725 KZD 1998 10 31 05 50 00 4708-91 D co CCGG 218.880 -999.990 ... R5 1998 11 17 14 42 00 44.4500 75.5700 412.00 407.00 5.00 69726 KZD 1998 11 07 06 35 00 4243-91 D co CCGG 207.630 -999.990 ... R5 1998 12 04 09 12 00 44.4500 75.5700 412.00 407.00 5.00 69727 KZD 1998 11 07 06 35 00 4244-91 D co CCGG 207.700 -999.990 ... R5 1998 12 04 09 26 00 44.4500 75.5700 412.00 407.00 5.00 69728 KZD 1998 11 14 06 55 00 615-91 D co CCGG 208.790 -999.990 ... R5 1998 12 04 09 40 00 44.4500 75.5700 412.00 407.00 5.00 69729 KZD 1998 11 14 06 55 00 616-91 D co CCGG 207.610 -999.990 ... R5 1998 12 04 09 53 00 44.4500 75.5700 412.00 407.00 5.00 69730 KZD 1998 11 21 06 15 00 379-91 D co CCGG 176.930 -999.990 ... R5 1999 01 11 11 00 00 44.4500 75.5700 412.00 407.00 5.00 69731 KZD 1998 11 21 06 15 00 380-91 D co CCGG 177.210 -999.990 ... R5 1999 01 11 11 14 00 44.4500 75.5700 412.00 407.00 5.00 69732 KZD 1998 11 28 06 40 00 4581-91 D co CCGG 207.080 -999.990 ... R5 1999 01 11 12 22 00 44.4500 75.5700 412.00 407.00 5.00 69733 KZD 1998 11 28 06 40 00 4582-91 D co CCGG 209.520 -999.990 ... R5 1999 01 11 12 36 00 44.4500 75.5700 412.00 407.00 5.00 69734 KZD 1998 12 05 06 45 00 87-91 D co CCGG 224.210 -999.990 ... R5 1999 01 11 14 42 00 44.4500 75.5700 412.00 407.00 5.00 69735 KZD 1998 12 05 06 45 00 88-91 D co CCGG 223.480 -999.990 ... R5 1999 01 11 14 56 00 44.4500 75.5700 412.00 407.00 5.00 69736 KZD 1998 12 12 06 08 00 1981-91 D co CCGG 219.890 -999.990 ... R5 1999 01 11 15 09 00 44.4500 75.5700 412.00 407.00 5.00 69737 KZD 1998 12 12 06 08 00 1982-91 D co CCGG 219.910 -999.990 ... R5 1999 01 11 15 23 00 44.4500 75.5700 412.00 407.00 5.00 69738 KZD 1998 12 19 05 55 00 1571-91 D co CCGG 203.850 -999.990 ... R5 1999 01 25 13 53 00 44.4500 75.5700 412.00 407.00 5.00 69739 KZD 1998 12 19 05 55 00 1572-91 D co CCGG 203.850 -999.990 ... R5 1999 01 25 14 06 00 44.4500 75.5700 412.00 407.00 5.00 69740 KZD 1998 12 26 07 50 00 535-91 D co CCGG 194.050 -999.990 ... R5 1999 01 25 15 16 00 44.4500 75.5700 412.00 407.00 5.00 69741 KZD 1998 12 26 07 50 00 536-91 D co CCGG 192.760 -999.990 ... R5 1999 01 25 15 30 00 44.4500 75.5700 412.00 407.00 5.00 69742 KZD 1999 01 02 07 15 00 69-91 D co CCGG 190.240 -999.990 ... R5 1999 02 10 09 59 00 44.4500 75.5700 412.00 407.00 5.00 69743 KZD 1999 01 02 07 15 00 70-91 D co CCGG 189.870 -999.990 ... R5 1999 02 10 10 13 00 44.4500 75.5700 412.00 407.00 5.00 69744 KZD 1999 01 16 06 08 00 555-91 D co CCGG 250.830 -999.990 ..C R5 1999 02 10 09 32 00 44.4500 75.5700 412.00 407.00 5.00 69745 KZD 1999 01 16 06 08 00 556-91 D co CCGG 250.050 -999.990 ..C R5 1999 02 10 09 46 00 44.4500 75.5700 412.00 407.00 5.00 69746 KZD 1999 01 23 06 35 00 1127-91 D co CCGG 177.390 -999.990 ... R5 1999 02 17 14 18 00 44.4500 75.5700 412.00 407.00 5.00 69747 KZD 1999 01 23 06 35 00 1128-91 D co CCGG 177.030 -999.990 ... R5 1999 02 17 14 32 00 44.4500 75.5700 412.00 407.00 5.00 69748 KZD 1999 01 30 06 05 00 561-91 D co CCGG 210.520 -999.990 ... R5 1999 02 17 11 57 00 44.4500 75.5700 412.00 407.00 5.00 69749 KZD 1999 01 30 06 05 00 562-91 D co CCGG 210.040 -999.990 ... R5 1999 02 17 12 11 00 44.4500 75.5700 412.00 407.00 5.00 69750 KZD 1999 02 06 07 15 00 821-91 D co CCGG 208.360 -999.990 ... R5 1999 03 22 14 26 00 44.4500 75.5700 412.00 407.00 5.00 69751 KZD 1999 02 06 07 15 00 822-91 D co CCGG 209.100 -999.990 ... R5 1999 03 22 14 40 00 44.4500 75.5700 412.00 407.00 5.00 69752 KZD 1999 02 27 07 10 00 4729-91 D co CCGG 204.210 -999.990 ... R5 1999 03 22 13 59 00 44.4500 75.5700 412.00 407.00 5.00 69753 KZD 1999 02 27 07 10 00 4730-91 D co CCGG 204.400 -999.990 ... R5 1999 03 22 14 12 00 44.4500 75.5700 412.00 407.00 5.00 69754 KZD 1999 03 06 06 05 00 4199-91 D co CCGG 200.360 -999.990 ... R5 1999 04 01 14 30 00 44.4500 75.5700 412.00 407.00 5.00 69755 KZD 1999 03 06 06 05 00 4200-91 D co CCGG 200.140 -999.990 ... R5 1999 04 01 14 44 00 44.4500 75.5700 412.00 407.00 5.00 69756 KZD 1999 03 14 06 03 00 4743-91 D co CCGG 180.750 -999.990 ... R5 1999 04 07 09 55 00 44.4500 75.5700 412.00 407.00 5.00 69757 KZD 1999 03 14 06 03 00 4744-91 D co CCGG 180.830 -999.990 ... R5 1999 04 07 10 09 00 44.4500 75.5700 412.00 407.00 5.00 69758 KZD 1999 03 21 05 55 00 4375-91 D co CCGG 194.120 -999.990 ... R5 1999 04 07 10 23 00 44.4500 75.5700 412.00 407.00 5.00 69759 KZD 1999 03 21 05 55 00 4376-91 D co CCGG 194.370 -999.990 ... R5 1999 04 07 10 36 00 44.4500 75.5700 412.00 407.00 5.00 69760 KZD 1999 04 04 04 55 00 1687-91 D co CCGG 189.010 -999.990 ... R5 1999 04 28 11 47 00 44.4500 75.5700 412.00 407.00 5.00 69761 KZD 1999 04 04 04 55 00 1688-91 D co CCGG 189.870 -999.990 ... R5 1999 04 28 12 01 00 44.4500 75.5700 412.00 407.00 5.00 69762 KZD 1999 04 10 12 34 56 205-91 D co CCGG 166.100 -999.990 ... R5 1999 04 28 11 20 00 44.4500 75.5700 412.00 407.00 5.00 69763 KZD 1999 04 10 12 34 56 206-91 D co CCGG 164.620 -999.990 ... R5 1999 04 28 11 34 00 44.4500 75.5700 412.00 407.00 5.00 69764 KZD 1999 04 18 04 55 00 311-91 D co CCGG 150.970 -999.990 ... R5 1999 05 18 14 32 00 44.4500 75.5700 412.00 407.00 5.00 69765 KZD 1999 04 18 04 55 00 312-91 D co CCGG 153.390 -999.990 ... R5 1999 05 18 14 46 00 44.4500 75.5700 412.00 407.00 5.00 69766 KZD 1999 04 25 05 15 00 197-98 D co CCGG 183.880 -999.990 ... R5 1999 05 18 15 00 00 44.4500 75.5700 412.00 407.00 5.00 69767 KZD 1999 04 25 05 15 00 198-98 D co CCGG 183.240 -999.990 ... R5 1999 05 18 15 13 00 44.4500 75.5700 412.00 407.00 5.00 69768 KZD 1999 05 01 05 05 00 111-98 D co CCGG 160.690 -999.990 ... R5 1999 05 25 14 53 00 44.4500 75.5700 412.00 407.00 5.00 69769 KZD 1999 05 01 05 05 00 112-98 D co CCGG 159.990 -999.990 ... R5 1999 05 25 15 07 00 44.4500 75.5700 412.00 407.00 5.00 69770 KZD 1999 05 09 04 50 00 1861-91 D co CCGG 154.560 -999.990 ... R5 1999 05 25 15 20 00 44.4500 75.5700 412.00 407.00 5.00 69771 KZD 1999 05 09 04 50 00 1862-91 D co CCGG 153.760 -999.990 ... R5 1999 05 25 15 34 00 44.4500 75.5700 412.00 407.00 5.00 69772 KZD 1999 05 17 04 30 00 1975-91 D co CCGG 147.900 -999.990 ... R5 1999 06 09 16 01 00 44.4500 75.5700 412.00 407.00 5.00 69773 KZD 1999 05 17 04 30 00 1976-91 D co CCGG 147.210 -999.990 ... R5 1999 06 09 16 15 00 44.4500 75.5700 412.00 407.00 5.00 69774 KZD 1999 05 23 04 50 00 4061-91 D co CCGG 156.690 -999.990 ... R5 1999 06 09 15 05 00 44.4500 75.5700 412.00 407.00 5.00 69775 KZD 1999 05 23 04 50 00 4062-91 D co CCGG 158.280 -999.990 ... R5 1999 06 09 15 18 00 44.4500 75.5700 412.00 407.00 5.00 69776 KZD 1999 05 30 04 20 00 1595-91 D co CCGG 138.920 -999.990 ... R5 1999 06 18 10 54 00 44.4500 75.5700 412.00 407.00 5.00 69777 KZD 1999 06 06 04 23 00 133-98 D co CCGG 138.380 -999.990 ... R5 1999 06 18 11 21 00 44.4500 75.5700 412.00 407.00 5.00 69779 KZD 1999 06 06 04 23 00 134-98 D co CCGG 138.710 -999.990 ... R5 1999 06 18 11 35 00 44.4500 75.5700 412.00 407.00 5.00 69780 KZD 1999 06 13 04 28 00 35-98 D co CCGG 118.290 -999.990 ... R5 1999 07 12 13 26 00 44.4500 75.5700 412.00 407.00 5.00 69781 KZD 1999 06 13 04 28 00 36-98 D co CCGG 118.410 -999.990 ... R5 1999 07 12 13 40 00 44.4500 75.5700 412.00 407.00 5.00 69782 KZD 1999 06 20 05 25 00 4773-91 D co CCGG 122.700 -999.990 ... R5 1999 07 12 14 21 00 44.4500 75.5700 412.00 407.00 5.00 69783 KZD 1999 06 20 05 25 00 4774-91 D co CCGG 122.050 -999.990 ... R5 1999 07 12 14 35 00 44.4500 75.5700 412.00 407.00 5.00 69784 KZD 1999 06 26 04 30 00 1511-91 D co CCGG 111.120 -999.990 ... R5 1999 07 28 10 37 00 44.4500 75.5700 412.00 407.00 5.00 69785 KZD 1999 06 26 04 30 00 1512-91 D co CCGG 112.270 -999.990 ... R5 1999 07 28 10 51 00 44.4500 75.5700 412.00 407.00 5.00 69786 KZD 1999 07 03 05 20 00 315-91 D co CCGG 117.900 -999.990 ... R5 1999 07 28 11 04 00 44.4500 75.5700 412.00 407.00 5.00 69787 KZD 1999 07 03 05 20 00 316-91 D co CCGG 119.340 -999.990 ... R5 1999 07 28 11 18 00 44.4500 75.5700 412.00 407.00 5.00 69788 KZD 1999 07 10 04 30 00 4583-91 D co CCGG 120.470 -999.990 ... R5 1999 08 05 15 23 00 44.4500 75.5700 412.00 407.00 5.00 69789 KZD 1999 07 10 04 30 00 4584-91 D co CCGG 118.820 -999.990 ... R5 1999 08 05 15 37 00 44.4500 75.5700 412.00 407.00 5.00 69790 KZD 1999 07 17 04 35 00 4087-91 D co CCGG 115.620 -999.990 ... R5 1999 08 05 14 01 00 44.4500 75.5700 412.00 407.00 5.00 69791 KZD 1999 07 17 04 35 00 4088-91 D co CCGG 114.270 -999.990 ... R5 1999 08 05 14 15 00 44.4500 75.5700 412.00 407.00 5.00 69792 KZD 1999 07 24 04 35 00 465-91 D co CCGG 111.350 -999.990 ... R5 1999 09 02 11 56 00 44.4500 75.5700 412.00 407.00 5.00 69793 KZD 1999 07 24 04 35 00 466-91 D co CCGG 110.560 -999.990 ... R5 1999 09 02 12 09 00 44.4500 75.5700 412.00 407.00 5.00 69794 KZD 1999 08 08 04 55 00 857-91 D co CCGG 102.610 -999.990 P.. R5 1999 09 02 12 23 00 44.4500 75.5700 412.00 407.00 5.00 69795 KZD 1999 08 08 04 55 00 858-91 D co CCGG 99.700 -999.990 P.. R5 1999 09 02 12 37 00 44.4500 75.5700 412.00 407.00 5.00 69796 KZD 1999 08 14 04 30 00 1143-91 D co CCGG 105.910 -999.990 ... R5 1999 09 16 13 11 00 44.4500 75.5700 412.00 407.00 5.00 69797 KZD 1999 08 14 04 30 00 1144-91 D co CCGG 107.070 -999.990 ... R5 1999 09 16 13 25 00 44.4500 75.5700 412.00 407.00 5.00 69798 KZD 1999 08 21 04 55 00 175-98 D co CCGG 142.260 -999.990 ... R5 1999 09 16 14 37 00 44.4500 75.5700 412.00 407.00 5.00 69799 KZD 1999 08 21 04 55 00 176-98 D co CCGG 141.230 -999.990 ... R5 1999 09 16 14 51 00 44.4500 75.5700 412.00 407.00 5.00 69800 KZD 1999 08 28 05 05 00 1727-91 D co CCGG 137.280 -999.990 ... R5 1999 09 22 10 19 00 44.4500 75.5700 412.00 407.00 5.00 69801 KZD 1999 08 28 05 05 00 1728-91 D co CCGG 138.250 -999.990 ... R5 1999 09 22 10 33 00 44.4500 75.5700 412.00 407.00 5.00 69802 KZD 1999 09 04 04 45 00 4075-91 D co CCGG 116.620 -999.990 ... R5 1999 09 21 09 10 00 44.4500 75.5700 412.00 407.00 5.00 69803 KZD 1999 09 04 04 45 00 4076-91 D co CCGG 116.930 -999.990 ... R5 1999 09 21 09 23 00 44.4500 75.5700 412.00 407.00 5.00 69804 KZD 1999 09 11 04 45 00 4372-91 D co CCGG 110.930 -999.990 ... R5 1999 10 07 12 53 00 44.4500 75.5700 412.00 407.00 5.00 69805 KZD 1999 09 18 04 30 00 4595-91 D co CCGG 108.040 -999.990 ... R5 1999 10 06 13 59 00 44.4500 75.5700 412.00 407.00 5.00 69806 KZD 1999 09 18 04 30 00 4596-91 D co CCGG 107.440 -999.990 ... R5 1999 10 06 14 12 00 44.4500 75.5700 412.00 407.00 5.00 69807 KZD 1999 09 25 04 45 00 1171-91 D co CCGG 119.200 -999.990 ... R5 1999 10 19 15 32 00 44.4500 75.5700 412.00 407.00 5.00 69808 KZD 1999 09 25 04 45 00 1172-91 D co CCGG 120.500 -999.990 ... R5 1999 10 19 15 46 00 44.4500 75.5700 412.00 407.00 5.00 69809 KZD 1999 10 02 04 25 00 591-91 D co CCGG 114.180 -999.990 ... R5 1999 10 19 15 05 00 44.4500 75.5700 412.00 407.00 5.00 69810 KZD 1999 10 02 04 25 00 592-91 D co CCGG 114.060 -999.990 ... R5 1999 10 19 15 19 00 44.4500 75.5700 412.00 407.00 5.00 69811 KZD 1999 10 09 04 45 00 543-91 D co CCGG 130.510 -999.990 ... R5 1999 11 03 13 53 00 44.4500 75.5700 412.00 407.00 5.00 69812 KZD 1999 10 09 04 45 00 544-91 D co CCGG 130.110 -999.990 ... R5 1999 11 03 14 07 00 44.4500 75.5700 412.00 407.00 5.00 69813 KZD 1999 10 16 04 20 00 1939-91 D co CCGG 129.280 -999.990 ... R5 1999 11 03 14 22 00 44.4500 75.5700 412.00 407.00 5.00 69814 KZD 1999 10 16 04 20 00 1940-91 D co CCGG 130.400 -999.990 ... R5 1999 11 03 14 36 00 44.4500 75.5700 412.00 407.00 5.00 69815 KZD 1999 10 23 04 40 00 4207-91 D co CCGG 127.250 -999.990 ... R5 1999 11 15 15 06 00 44.4500 75.5700 412.00 407.00 5.00 69816 KZD 1999 10 23 04 40 00 4208-91 D co CCGG 127.520 -999.990 ... R5 1999 11 15 15 20 00 44.4500 75.5700 412.00 407.00 5.00 69817 KZD 1999 10 30 04 55 00 703-91 D co CCGG 142.430 -999.990 ... R5 1999 11 15 15 33 00 44.4500 75.5700 412.00 407.00 5.00 69818 KZD 1999 10 30 04 55 00 704-91 D co CCGG 142.170 -999.990 ... R5 1999 11 15 15 47 00 44.4500 75.5700 412.00 407.00 5.00 69819 KZD 1999 11 06 05 30 00 4033-91 D co CCGG 133.380 -999.990 ... R5 1999 12 07 14 59 00 44.4500 75.5700 412.00 407.00 5.00 69820 KZD 1999 11 06 05 30 00 4034-91 D co CCGG 136.050 -999.990 ... R5 1999 12 07 15 13 00 44.4500 75.5700 412.00 407.00 5.00 69821 KZD 1999 11 13 05 30 00 1757-91 D co CCGG 171.110 -999.990 ... R5 1999 12 07 14 32 00 44.4500 75.5700 412.00 407.00 5.00 69822 KZD 1999 11 13 05 30 00 1758-91 D co CCGG 168.280 -999.990 ... R5 1999 12 07 14 46 00 44.4500 75.5700 412.00 407.00 5.00 69823 KZD 1999 11 20 05 30 00 1801-91 D co CCGG 159.450 -999.990 ... R5 1999 12 17 15 25 00 44.4500 75.5700 412.00 407.00 5.00 69824 KZD 1999 11 20 05 30 00 1802-91 D co CCGG -999.990 -999.990 *.. R5 1999 12 17 15 39 00 44.4500 75.5700 412.00 407.00 5.00 69825 KZD 1999 11 27 05 30 00 4577-91 D co CCGG 162.710 -999.990 P.. R5 1999 12 17 15 53 00 44.4500 75.5700 412.00 407.00 5.00 69826 KZD 1999 11 27 05 30 00 4578-91 D co CCGG 158.800 -999.990 P.. R5 1999 12 17 16 06 00 44.4500 75.5700 412.00 407.00 5.00 69827 KZD 1999 12 04 05 20 00 4845-91 D co CCGG 193.740 -999.990 ... R5 2000 01 05 12 14 00 44.4500 75.5700 412.00 407.00 5.00 69828 KZD 1999 12 04 05 20 00 4846-91 D co CCGG 193.620 -999.990 ... R5 2000 01 05 12 27 00 44.4500 75.5700 412.00 407.00 5.00 69829 KZD 1999 12 12 05 20 00 649-91 D co CCGG 151.940 -999.990 ... R5 2000 01 05 12 41 00 44.4500 75.5700 412.00 407.00 5.00 69830 KZD 1999 12 12 05 20 00 650-91 D co CCGG 152.600 -999.990 ... R5 2000 01 05 12 55 00 44.4500 75.5700 412.00 407.00 5.00 69831 KZD 1999 12 18 05 30 00 101-98 D co CCGG 199.420 -999.990 ... R5 2000 01 25 14 04 00 44.4500 75.5700 412.00 407.00 5.00 69832 KZD 1999 12 18 05 30 00 102-98 D co CCGG 198.050 -999.990 ... R5 2000 01 25 14 17 00 44.4500 75.5700 412.00 407.00 5.00 69833 KZD 1999 12 25 06 30 00 561-91 D co CCGG 165.230 -999.990 ... R5 2000 01 25 12 42 00 44.4500 75.5700 412.00 407.00 5.00 69834 KZD 1999 12 25 06 30 00 562-91 D co CCGG 165.400 -999.990 ... R5 2000 01 25 12 55 00 44.4500 75.5700 412.00 407.00 5.00 69835 KZD 2000 01 02 06 30 00 4371-91 D co CCGG 158.460 -999.990 ... R5 2000 01 26 12 19 00 44.4500 75.5700 412.00 407.00 5.00 69836 KZD 2000 01 02 06 30 00 4372-91 D co CCGG 157.810 -999.990 ... R5 2000 01 26 12 33 00 44.4500 75.5700 412.00 407.00 5.00 69837 KZD 2000 01 08 05 40 00 703-91 D co CCGG 169.390 -999.990 ... R5 2000 01 26 12 46 00 44.4500 75.5700 412.00 407.00 5.00 69838 KZD 2000 01 08 05 40 00 704-91 D co CCGG 169.620 -999.990 ... R5 2000 01 26 13 00 00 44.4500 75.5700 412.00 407.00 5.00 69839 KZD 2000 01 15 05 50 00 4711-91 D co CCGG 321.020 -999.990 .NC R5 2000 02 09 14 24 00 44.4500 75.5700 412.00 407.00 5.00 69840 KZD 2000 01 15 05 50 00 4712-91 D co CCGG 319.910 -999.990 .NC R5 2000 02 09 14 38 00 44.4500 75.5700 412.00 407.00 5.00 69841 KZD 2000 01 22 05 30 00 1773-91 D co CCGG 242.080 -999.990 ..C R5 2000 02 09 13 51 00 44.4500 75.5700 412.00 407.00 5.00 69842 KZD 2000 01 22 05 30 00 1774-91 D co CCGG 242.570 -999.990 ..C R5 2000 02 09 14 05 00 44.4500 75.5700 412.00 407.00 5.00 69843 KZD 2000 01 29 05 30 00 353-91 D co CCGG 214.280 -999.990 ... R5 2000 02 23 11 17 00 44.4500 75.5700 412.00 407.00 5.00 69844 KZD 2000 01 29 05 30 00 354-91 D co CCGG 214.340 -999.990 ... R5 2000 02 23 11 30 00 44.4500 75.5700 412.00 407.00 5.00 69845 KZD 2000 02 05 05 45 00 233-91 D co CCGG 278.720 -999.990 .XC R5 2000 02 23 10 50 00 44.4500 75.5700 412.00 407.00 5.00 69846 KZD 2000 02 05 05 45 00 234-91 D co CCGG 279.410 -999.990 .XC R5 2000 02 23 11 03 00 44.4500 75.5700 412.00 407.00 5.00 69847 KZD 2000 02 12 05 40 00 1925-91 D co CCGG 235.780 -999.990 ..C R5 2000 03 09 15 23 00 44.4500 75.5700 412.00 407.00 5.00 69848 KZD 2000 02 12 05 40 00 1926-91 D co CCGG 235.650 -999.990 ..C R5 2000 03 09 15 37 00 44.4500 75.5700 412.00 407.00 5.00 69849 KZD 2000 02 19 05 45 00 379-91 D co CCGG 182.870 -999.990 ... R5 2000 03 10 09 56 00 44.4500 75.5700 412.00 407.00 5.00 69850 KZD 2000 02 19 05 45 00 380-91 D co CCGG 182.790 -999.990 ... R5 2000 03 10 10 09 00 44.4500 75.5700 412.00 407.00 5.00 69851 KZD 2000 02 26 05 15 00 25-91 D co CCGG 230.090 -999.990 ..C R5 2000 03 27 11 39 00 44.4500 75.5700 412.00 407.00 5.00 69852 KZD 2000 02 26 05 15 00 26-91 D co CCGG 228.990 -999.990 ... R5 2000 03 27 11 52 00 44.4500 75.5700 412.00 407.00 5.00 69853 KZD 2000 03 04 05 40 00 107-91 D co CCGG 189.420 -999.990 ... R5 2000 03 27 09 27 00 44.4500 75.5700 412.00 407.00 5.00 69854 KZD 2000 03 04 05 40 00 108-91 D co CCGG 192.140 -999.990 ... R5 2000 03 27 09 40 00 44.4500 75.5700 412.00 407.00 5.00 69855 KZD 2000 03 10 05 15 00 1513-91 D co CCGG 217.790 -999.990 ... R5 2000 04 12 13 46 00 44.4500 75.5700 412.00 407.00 5.00 69856 KZD 2000 03 10 05 15 00 1514-91 D co CCGG 217.090 -999.990 ... R5 2000 04 12 13 59 00 44.4500 75.5700 412.00 407.00 5.00 69857 KZD 2000 03 18 05 35 00 4393-91 D co CCGG 187.440 -999.990 ... R5 2000 04 12 13 20 00 44.4500 75.5700 412.00 407.00 5.00 69858 KZD 2000 03 18 05 35 00 4394-91 D co CCGG 188.230 -999.990 ... R5 2000 04 12 13 33 00 44.4500 75.5700 412.00 407.00 5.00 69859 KZD 2000 03 25 05 35 00 1499-91 D co CCGG 150.640 -999.990 ... R5 2000 04 17 13 40 00 44.4500 75.5700 412.00 407.00 5.00 69860 KZD 2000 03 25 05 35 00 1500-91 D co CCGG 149.560 -999.990 ... R5 2000 04 17 13 53 00 44.4500 75.5700 412.00 407.00 5.00 69861 KZD 2000 04 01 04 30 00 1521-91 D co CCGG 148.260 -999.990 ... R5 2000 04 17 13 14 00 44.4500 75.5700 412.00 407.00 5.00 69862 KZD 2000 04 01 04 30 00 1522-91 D co CCGG 148.480 -999.990 ... R5 2000 04 17 13 27 00 44.4500 75.5700 412.00 407.00 5.00 69863 KZD 2000 04 08 04 30 00 1727-91 D co CCGG 180.500 -999.990 ... R5 2000 04 27 13 01 00 44.4500 75.5700 412.00 407.00 5.00 69864 KZD 2000 04 08 04 30 00 4526-91 D co CCGG 179.940 -999.990 ... R5 2000 04 27 13 14 00 44.4500 75.5700 412.00 407.00 5.00 69865 KZD 2000 04 15 04 50 00 4029-91 D co CCGG 139.750 -999.990 ... R5 2000 05 09 10 02 00 44.4500 75.5700 412.00 407.00 5.00 69866 KZD 2000 04 15 04 50 00 4030-91 D co CCGG 140.240 -999.990 ... R5 2000 05 09 10 15 00 44.4500 75.5700 412.00 407.00 5.00 69867 KZD 2000 04 22 04 20 00 1207-91 D co CCGG 172.200 -999.990 ... R5 2000 05 09 09 35 00 44.4500 75.5700 412.00 407.00 5.00 69868 KZD 2000 04 22 04 20 00 1208-91 D co CCGG 174.190 -999.990 ... R5 2000 05 09 09 48 00 44.4500 75.5700 412.00 407.00 5.00 69869 KZD 2000 04 29 04 35 00 4967-91 D co CCGG 172.540 -999.990 ... R5 2000 05 31 12 53 00 44.4500 75.5700 412.00 407.00 5.00 69870 KZD 2000 04 29 04 35 00 4968-91 D co CCGG 172.910 -999.990 ... R5 2000 05 31 13 06 00 44.4500 75.5700 412.00 407.00 5.00 69871 KZD 2000 05 06 04 30 00 981-91 D co CCGG 142.460 -999.990 ... R5 2000 05 31 13 19 00 44.4500 75.5700 412.00 407.00 5.00 69872 KZD 2000 05 06 04 30 00 982-91 D co CCGG 141.100 -999.990 ... R5 2000 05 31 13 32 00 44.4500 75.5700 412.00 407.00 5.00 69873 KZD 2000 05 13 04 45 00 1941-91 D co CCGG 143.620 -999.990 ... R5 2000 06 07 14 56 00 44.4500 75.5700 412.00 407.00 5.00 69874 KZD 2000 05 13 04 45 00 1942-91 D co CCGG 142.620 -999.990 ... R5 2000 06 07 15 09 00 44.4500 75.5700 412.00 407.00 5.00 69875 KZD 2000 05 20 04 30 00 1265-91 D co CCGG -999.990 -999.990 *.. R5 2000 06 07 14 17 00 44.4500 75.5700 412.00 407.00 5.00 69876 KZD 2000 05 20 04 30 00 4555-91 D co CCGG 128.960 -999.990 ... R5 2000 06 07 14 04 00 44.4500 75.5700 412.00 407.00 5.00 69877 KZD 2000 05 27 04 40 00 1717-91 D co CCGG 141.650 -999.990 ... R5 2000 07 05 11 34 00 44.4500 75.5700 412.00 407.00 5.00 69878 KZD 2000 05 27 04 40 00 1718-91 D co CCGG 140.160 -999.990 ... R5 2000 07 05 11 47 00 44.4500 75.5700 412.00 407.00 5.00 69879 KZD 2000 06 03 04 30 00 1341-91 D co CCGG 132.020 -999.990 ... R5 2000 07 05 11 08 00 44.4500 75.5700 412.00 407.00 5.00 69880 KZD 2000 06 03 04 30 00 1342-91 D co CCGG 132.750 -999.990 ... R5 2000 07 05 11 21 00 44.4500 75.5700 412.00 407.00 5.00 69881 KZD 2000 06 10 04 10 00 1209-91 D co CCGG 126.860 -999.990 ... R5 2000 07 31 14 05 00 44.4500 75.5700 412.00 407.00 5.00 69882 KZD 2000 06 10 04 10 00 1210-91 D co CCGG 126.770 -999.990 ... R5 2000 07 31 14 18 00 44.4500 75.5700 412.00 407.00 5.00 69883 KZD 2000 06 17 04 25 00 4275-91 D co CCGG 120.940 -999.990 Z.. R5 2000 07 31 13 39 00 44.4500 75.5700 412.00 407.00 5.00 69884 KZD 2000 06 17 04 25 00 4275-91 D co CCGG 148.350 -999.990 Z.. R5 2000 08 01 15 39 00 44.4500 75.5700 412.00 407.00 5.00 69884 KZD 2000 06 17 04 25 00 4276-91 D co CCGG 119.620 -999.990 ... R5 2000 07 31 13 52 00 44.4500 75.5700 412.00 407.00 5.00 69885 KZD 2000 06 24 04 25 00 4131-91 D co CCGG 132.170 -999.990 P.. R5 2000 07 24 14 58 00 44.4500 75.5700 412.00 407.00 5.00 69886 KZD 2000 06 24 04 25 00 4132-91 D co CCGG 136.900 -999.990 P.. R5 2000 07 24 15 11 00 44.4500 75.5700 412.00 407.00 5.00 69887 KZD 2000 07 01 04 30 00 4607-91 D co CCGG 126.990 -999.990 P.. R5 2000 07 24 15 24 00 44.4500 75.5700 412.00 407.00 5.00 69888 KZD 2000 07 01 04 30 00 4608-91 D co CCGG 133.380 -999.990 P.< R5 2000 07 24 15 37 00 44.4500 75.5700 412.00 407.00 5.00 69889 KZD 2000 07 08 04 25 00 2019-91 D co CCGG 132.310 -999.990 ... R5 2000 08 02 11 04 00 44.4500 75.5700 412.00 407.00 5.00 69890 KZD 2000 07 08 04 25 00 2020-91 D co CCGG 132.250 -999.990 ... R5 2000 08 02 11 17 00 44.4500 75.5700 412.00 407.00 5.00 69891 KZD 2000 07 15 04 30 00 1563-91 D co CCGG 117.770 -999.990 ... R5 2000 08 02 10 38 00 44.4500 75.5700 412.00 407.00 5.00 69892 KZD 2000 07 15 04 30 00 1564-91 D co CCGG 117.270 -999.990 ... R5 2000 08 02 10 51 00 44.4500 75.5700 412.00 407.00 5.00 69893 KZD 2000 07 22 04 25 00 185-98 D co CCGG 113.420 -999.990 ... R5 2000 08 17 15 04 00 44.4500 75.5700 412.00 407.00 5.00 69894 KZD 2000 07 22 04 25 00 186-98 D co CCGG 112.350 -999.990 ... R5 2000 08 17 15 17 00 44.4500 75.5700 412.00 407.00 5.00 69895 KZD 2000 07 29 04 15 00 31-98 D co CCGG 122.880 -999.990 ... R5 2000 08 17 15 30 00 44.4500 75.5700 412.00 407.00 5.00 69896 KZD 2000 07 29 04 15 00 32-98 D co CCGG 122.360 -999.990 ... R5 2000 08 17 15 43 00 44.4500 75.5700 412.00 407.00 5.00 69897 KZD 2000 08 05 04 10 00 1937-91 D co CCGG 127.570 -999.990 ... R5 2000 08 28 13 36 00 44.4500 75.5700 412.00 407.00 5.00 69898 KZD 2000 08 05 04 10 00 1938-91 D co CCGG 127.770 -999.990 ... R5 2000 08 28 13 49 00 44.4500 75.5700 412.00 407.00 5.00 69899 KZD 2000 08 12 04 10 00 1773-91 D co CCGG 109.870 -999.990 ... R5 2000 08 28 13 10 00 44.4500 75.5700 412.00 407.00 5.00 69900 KZD 2000 08 12 04 10 00 1774-91 D co CCGG 108.970 -999.990 ... R5 2000 08 28 13 23 00 44.4500 75.5700 412.00 407.00 5.00 69901 KZD 2000 08 19 04 05 00 679-91 D co CCGG 111.850 -999.990 ... R5 2000 09 12 14 22 00 44.4500 75.5700 412.00 407.00 5.00 69902 KZD 2000 08 19 04 05 00 680-91 D co CCGG 110.870 -999.990 ... R5 2000 09 12 14 35 00 44.4500 75.5700 412.00 407.00 5.00 69903 KZD 2000 08 27 04 05 00 1403-91 D co CCGG 115.800 -999.990 ... R5 2000 09 12 13 02 00 44.4500 75.5700 412.00 407.00 5.00 69904 KZD 2000 08 27 04 05 00 1404-91 D co CCGG 115.390 -999.990 ... R5 2000 09 12 13 15 00 44.4500 75.5700 412.00 407.00 5.00 69905 KZD 2000 09 03 04 15 00 4251-91 D co CCGG 126.580 -999.990 ... R5 2000 10 02 13 33 00 44.4500 75.5700 412.00 407.00 5.00 69906 KZD 2000 09 03 04 15 00 4252-91 D co CCGG 125.630 -999.990 ... R5 2000 10 02 13 46 00 44.4500 75.5700 412.00 407.00 5.00 69907 KZD 2000 09 10 04 20 00 927-91 D co CCGG 124.720 -999.990 ... R5 2000 10 02 13 07 00 44.4500 75.5700 412.00 407.00 5.00 69908 KZD 2000 09 10 04 20 00 928-91 D co CCGG 124.870 -999.990 ... R5 2000 10 02 13 20 00 44.4500 75.5700 412.00 407.00 5.00 69909 KZD 2000 09 16 04 20 00 1183-91 D co CCGG 112.490 -999.990 ... R5 2000 10 11 08 11 00 44.4500 75.5700 412.00 407.00 5.00 69910 KZD 2000 09 16 04 20 00 1184-91 D co CCGG 112.410 -999.990 ... R5 2000 10 11 08 24 00 44.4500 75.5700 412.00 407.00 5.00 69911 KZD 2000 09 23 04 30 00 1041-91 D co CCGG 114.430 -999.990 ... R5 2000 10 11 08 37 00 44.4500 75.5700 412.00 407.00 5.00 69912 KZD 2000 09 23 04 30 00 1042-91 D co CCGG 113.580 -999.990 ... R5 2000 10 11 08 50 00 44.4500 75.5700 412.00 407.00 5.00 69913 KZD 2000 09 30 04 35 00 4503-91 D co CCGG 102.370 -999.990 ... R5 2000 10 24 14 02 00 44.4500 75.5700 412.00 407.00 5.00 69914 KZD 2000 09 30 04 35 00 4504-91 D co CCGG 101.120 -999.990 ... R5 2000 10 24 14 15 00 44.4500 75.5700 412.00 407.00 5.00 69915 KZD 2000 10 08 04 25 00 4645-91 D co CCGG 108.060 -999.990 ... R5 2000 10 24 14 28 00 44.4500 75.5700 412.00 407.00 5.00 69916 KZD 2000 10 08 04 25 00 4646-91 D co CCGG 109.920 -999.990 ... R5 2000 10 24 14 41 00 44.4500 75.5700 412.00 407.00 5.00 69917 KZD 2000 10 14 04 05 00 4787-91 D co CCGG 109.970 -999.990 ... R5 2000 11 14 12 39 00 44.4500 75.5700 412.00 407.00 5.00 69918 KZD 2000 10 14 04 05 00 4788-91 D co CCGG 108.980 -999.990 ... R5 2000 11 14 12 52 00 44.4500 75.5700 412.00 407.00 5.00 69919 KZD 2000 10 22 04 35 00 4807-91 D co CCGG 112.870 -999.990 ... R5 2000 11 14 13 05 00 44.4500 75.5700 412.00 407.00 5.00 69920 KZD 2000 10 22 04 35 00 4808-91 D co CCGG 113.040 -999.990 ... R5 2000 11 14 13 18 00 44.4500 75.5700 412.00 407.00 5.00 69921 KZD 2000 10 29 05 30 00 4933-91 D co CCGG 122.110 -999.990 ... R5 2000 12 14 11 13 00 44.4500 75.5700 412.00 407.00 5.00 69922 KZD 2000 10 29 05 30 00 4934-91 D co CCGG 120.890 -999.990 ... R5 2000 12 14 11 26 00 44.4500 75.5700 412.00 407.00 5.00 69923 KZD 2000 11 04 05 35 00 1427-91 D co CCGG 123.030 -999.990 ... R5 2000 12 14 08 59 00 44.4500 75.5700 412.00 407.00 5.00 69924 KZD 2000 11 04 05 35 00 1428-91 D co CCGG 122.670 -999.990 ... R5 2000 12 14 09 12 00 44.4500 75.5700 412.00 407.00 5.00 69925 KZD 2000 11 11 05 35 00 29-98 D co CCGG 136.060 -999.990 ... R5 2000 12 18 15 04 00 44.4500 75.5700 412.00 407.00 5.00 69926 KZD 2000 11 11 05 35 00 30-98 D co CCGG 135.420 -999.990 ... R5 2000 12 18 15 17 00 44.4500 75.5700 412.00 407.00 5.00 69927 KZD 2000 11 18 05 30 00 2079-91 D co CCGG 135.910 -999.990 ... R5 2000 12 18 15 30 00 44.4500 75.5700 412.00 407.00 5.00 69928 KZD 2000 11 18 05 30 00 2080-91 D co CCGG 136.030 -999.990 ... R5 2000 12 18 15 43 00 44.4500 75.5700 412.00 407.00 5.00 69929 KZD 2000 11 25 05 25 00 2019-91 D co CCGG 156.330 -999.990 ... R5 2000 12 27 12 00 00 44.4500 75.5700 412.00 407.00 5.00 69930 KZD 2000 11 25 05 25 00 2020-91 D co CCGG 157.550 -999.990 ... R5 2000 12 27 12 13 00 44.4500 75.5700 412.00 407.00 5.00 69931 KZD 2000 12 02 05 35 00 1981-91 D co CCGG 134.650 -999.990 ... R5 2000 12 27 12 26 00 44.4500 75.5700 412.00 407.00 5.00 69932 KZD 2000 12 02 05 35 00 1982-91 D co CCGG 135.070 -999.990 ... R5 2000 12 27 12 39 00 44.4500 75.5700 412.00 407.00 5.00 69933 KZD 2000 12 10 05 35 00 4523-91 D co CCGG 194.420 -999.990 ... R5 2001 01 11 11 09 00 44.4500 75.5700 412.00 407.00 5.00 69934 KZD 2000 12 10 05 35 00 4524-91 D co CCGG 193.640 -999.990 ... R5 2001 01 11 11 22 00 44.4500 75.5700 412.00 407.00 5.00 69935 KZD 2000 12 16 05 45 00 11-98 D co CCGG 160.170 -999.990 ... R5 2001 01 11 09 50 00 44.4500 75.5700 412.00 407.00 5.00 69936 KZD 2000 12 16 05 45 00 12-98 D co CCGG 160.270 -999.990 ... R5 2001 01 11 10 03 00 44.4500 75.5700 412.00 407.00 5.00 69937 KZD 2000 12 23 05 30 00 649-91 D co CCGG 160.530 -999.990 P.. R5 2001 01 25 12 58 00 44.4500 75.5700 412.00 407.00 5.00 69938 KZD 2000 12 23 05 30 00 650-91 D co CCGG 164.490 -999.990 P.. R5 2001 01 25 13 11 00 44.4500 75.5700 412.00 407.00 5.00 69939 KZD 2000 12 30 05 45 00 1155-91 D co CCGG 148.990 -999.990 ... R5 2001 01 25 11 39 00 44.4500 75.5700 412.00 407.00 5.00 69940 KZD 2000 12 30 05 45 00 1156-91 D co CCGG 149.110 -999.990 ... R5 2001 01 25 11 52 00 44.4500 75.5700 412.00 407.00 5.00 69941 KZD 2001 01 06 05 45 00 1129-91 D co CCGG 160.150 -999.990 ... R5 2001 02 02 13 21 00 44.4500 75.5700 412.00 407.00 5.00 69942 KZD 2001 01 06 05 45 00 1130-91 D co CCGG 158.430 -999.990 ... R5 2001 02 02 13 34 00 44.4500 75.5700 412.00 407.00 5.00 69943 KZD 2001 01 13 05 50 00 4785-91 D co CCGG 150.730 -999.990 ... R5 2001 02 02 11 02 00 44.4500 75.5700 412.00 407.00 5.00 69944 KZD 2001 01 13 05 50 00 4786-91 D co CCGG 150.950 -999.990 ... R5 2001 02 02 11 15 00 44.4500 75.5700 412.00 407.00 5.00 69945 KZD 2001 01 20 05 45 00 1927-91 D co CCGG 168.890 -999.990 ... R5 2001 02 16 10 44 00 44.4500 75.5700 412.00 407.00 5.00 69946 KZD 2001 01 20 05 45 00 1928-91 D co CCGG 168.800 -999.990 ... R5 2001 02 16 10 58 00 44.4500 75.5700 412.00 407.00 5.00 69947 KZD 2001 01 20 05 45 00 1928-91 D co CCGG 169.390 -999.990 ... R5 2001 02 16 12 04 00 44.4500 75.5700 412.00 407.00 5.00 69947 KZD 2001 01 27 05 10 00 4145-91 D co CCGG 196.140 -999.990 ... R5 2001 02 27 10 34 00 44.4500 75.5700 412.00 407.00 5.00 69948 KZD 2001 01 27 05 10 00 4146-91 D co CCGG 197.470 -999.990 ... R5 2001 02 27 10 47 00 44.4500 75.5700 412.00 407.00 5.00 69949 KZD 2001 02 03 05 40 00 1293-91 D co CCGG 298.610 -999.990 .NC R5 2001 03 05 10 45 00 44.4500 75.5700 412.00 407.00 5.00 69950 KZD 2001 02 03 05 40 00 1294-91 D co CCGG 296.620 -999.990 .NC R5 2001 03 05 10 58 00 44.4500 75.5700 412.00 407.00 5.00 69951 KZD 2001 02 10 05 45 00 4115-91 D co CCGG 187.980 -999.990 ... R5 2001 03 05 09 25 00 44.4500 75.5700 412.00 407.00 5.00 69952 KZD 2001 02 10 05 45 00 4115-91 D co CCGG 188.170 -999.990 ... R5 2001 03 05 11 11 00 44.4500 75.5700 412.00 407.00 5.00 69952 KZD 2001 02 10 05 45 00 4116-91 D co CCGG 186.620 -999.990 ... R5 2001 03 05 09 38 00 44.4500 75.5700 412.00 407.00 5.00 69953 KZD 2001 02 10 05 45 00 4116-91 D co CCGG 188.180 -999.990 ... R5 2001 03 05 11 24 00 44.4500 75.5700 412.00 407.00 5.00 69953 KZD 2001 02 17 05 50 00 7-98 D co CCGG 161.830 -999.990 ... R5 2001 03 19 11 47 00 44.4500 75.5700 412.00 407.00 5.00 69954 KZD 2001 02 17 05 50 00 8-98 D co CCGG 161.340 -999.990 ... R5 2001 03 19 12 00 00 44.4500 75.5700 412.00 407.00 5.00 69955 KZD 2001 02 24 05 45 00 429-91 D co CCGG 174.890 -999.990 ... R5 2001 03 19 11 21 00 44.4500 75.5700 412.00 407.00 5.00 69956 KZD 2001 02 24 05 45 00 430-91 D co CCGG 174.160 -999.990 ... R5 2001 03 19 11 34 00 44.4500 75.5700 412.00 407.00 5.00 69957 KZD 2001 03 03 05 45 00 4331-91 D co CCGG 184.670 -999.990 ... R5 2001 03 27 12 02 00 44.4500 75.5700 412.00 407.00 5.00 69958 KZD 2001 03 03 05 45 00 4332-91 D co CCGG 183.260 -999.990 ... R5 2001 03 27 12 15 00 44.4500 75.5700 412.00 407.00 5.00 69959 KZD 2001 03 10 06 00 00 1405-91 D co CCGG 179.960 -999.990 ... R5 2001 04 11 17 20 00 44.4500 75.5700 412.00 407.00 5.00 69960 KZD 2001 03 10 06 00 00 1406-91 D co CCGG 179.790 -999.990 ... R5 2001 04 11 17 33 00 44.4500 75.5700 412.00 407.00 5.00 69961 KZD 2001 03 17 05 30 00 457-91 D co CCGG 180.770 -999.990 ... R5 2001 04 13 09 59 00 44.4500 75.5700 412.00 407.00 5.00 69962 KZD 2001 03 17 05 30 00 458-91 D co CCGG 178.750 -999.990 ... R5 2001 04 13 10 12 00 44.4500 75.5700 412.00 407.00 5.00 69963 KZD 2001 03 24 05 45 00 529-91 D co CCGG 165.040 -999.990 ... R5 2001 04 23 14 59 00 44.4500 75.5700 412.00 407.00 5.00 69964 KZD 2001 03 24 05 45 00 530-91 D co CCGG 166.700 -999.990 ... R5 2001 04 23 15 12 00 44.4500 75.5700 412.00 407.00 5.00 69965 KZD 2001 03 31 04 30 00 381-91 D co CCGG 181.440 -999.990 ... R5 2001 04 23 15 26 00 44.4500 75.5700 412.00 407.00 5.00 69966 KZD 2001 03 31 04 30 00 382-91 D co CCGG 182.330 -999.990 ... R5 2001 04 23 15 39 00 44.4500 75.5700 412.00 407.00 5.00 69967 KZD 2001 04 07 04 20 00 1151-91 D co CCGG 133.520 -999.990 ... R5 2001 04 30 12 36 00 44.4500 75.5700 412.00 407.00 5.00 69968 KZD 2001 04 07 04 20 00 1152-91 D co CCGG 132.110 -999.990 ... R5 2001 04 30 12 49 00 44.4500 75.5700 412.00 407.00 5.00 69969 KZD 2001 04 14 03 45 00 1927-91 D co CCGG 130.820 -999.990 ... R5 2001 04 30 12 10 00 44.4500 75.5700 412.00 407.00 5.00 69970 KZD 2001 04 14 03 45 00 1928-91 D co CCGG 130.040 -999.990 ... R5 2001 04 30 12 23 00 44.4500 75.5700 412.00 407.00 5.00 69971 KZD 2001 04 21 03 35 00 4845-91 D co CCGG 168.130 -999.990 ... R5 2001 05 18 14 30 00 44.4500 75.5700 412.00 407.00 5.00 69972 KZD 2001 04 21 03 35 00 4846-91 D co CCGG 167.950 -999.990 ... R5 2001 05 18 14 43 00 44.4500 75.5700 412.00 407.00 5.00 69973 KZD 2001 04 29 03 55 00 1455-91 D co CCGG 188.800 -999.990 ... R5 2001 05 18 14 04 00 44.4500 75.5700 412.00 407.00 5.00 69974 KZD 2001 04 29 03 55 00 1456-91 D co CCGG 189.910 -999.990 ... R5 2001 05 18 14 17 00 44.4500 75.5700 412.00 407.00 5.00 69975 KZD 2001 05 06 03 50 00 4681-91 D co CCGG 153.420 -999.990 ... R5 2001 06 01 16 10 00 44.4500 75.5700 412.00 407.00 5.00 69976 KZD 2001 05 06 03 50 00 4682-91 D co CCGG 151.810 -999.990 ... R5 2001 06 01 16 23 00 44.4500 75.5700 412.00 407.00 5.00 69977 KZD 2001 05 13 03 45 00 161-91 D co CCGG 141.380 -999.990 ... R5 2001 06 01 15 44 00 44.4500 75.5700 412.00 407.00 5.00 69978 KZD 2001 05 13 03 45 00 162-91 D co CCGG 142.030 -999.990 ... R5 2001 06 01 15 57 00 44.4500 75.5700 412.00 407.00 5.00 69979 KZD 2001 05 19 03 35 00 4763-91 D co CCGG 133.560 -999.990 ... R5 2001 06 13 12 07 00 44.4500 75.5700 412.00 407.00 5.00 69980 KZD 2001 05 19 03 35 00 4764-91 D co CCGG 132.730 -999.990 ... R5 2001 06 13 12 20 00 44.4500 75.5700 412.00 407.00 5.00 69981 KZD 2001 05 26 03 35 00 1717-91 D co CCGG 136.630 -999.990 ... R5 2001 06 13 13 53 00 44.4500 75.5700 412.00 407.00 5.00 69982 KZD 2001 05 26 03 35 00 1718-91 D co CCGG 135.860 -999.990 ... R5 2001 06 13 14 06 00 44.4500 75.5700 412.00 407.00 5.00 69983 KZD 2001 06 02 03 40 00 157-91 D co CCGG 118.090 -999.990 ... R5 2001 06 27 11 56 00 44.4500 75.5700 412.00 407.00 5.00 69984 KZD 2001 06 02 03 40 00 158-91 D co CCGG 118.150 -999.990 ... R5 2001 06 27 12 09 00 44.4500 75.5700 412.00 407.00 5.00 69985 KZD 2001 06 09 03 25 00 4691-91 D co CCGG 135.840 -999.990 ... R5 2001 06 27 12 22 00 44.4500 75.5700 412.00 407.00 5.00 69986 KZD 2001 06 09 03 25 00 4692-91 D co CCGG 135.050 -999.990 ... R5 2001 06 27 12 35 00 44.4500 75.5700 412.00 407.00 5.00 69987 KZD 2001 06 16 03 45 00 1639-91 D co CCGG 138.430 -999.990 ... R5 2001 07 09 11 13 00 44.4500 75.5700 412.00 407.00 5.00 69988 KZD 2001 06 16 03 45 00 1640-91 D co CCGG 138.130 -999.990 ... R5 2001 07 09 11 26 00 44.4500 75.5700 412.00 407.00 5.00 69989 KZD 2001 06 23 04 20 00 237-91 D co CCGG 126.600 -999.990 ... R5 2001 07 09 10 47 00 44.4500 75.5700 412.00 407.00 5.00 69990 KZD 2001 06 23 04 20 00 238-91 D co CCGG 125.380 -999.990 ... R5 2001 07 09 11 00 00 44.4500 75.5700 412.00 407.00 5.00 69991 KZD 2001 06 30 04 45 00 401-99 D co CCGG 125.180 -999.990 ... R5 2001 07 26 09 59 00 44.4500 75.5700 412.00 407.00 5.00 69992 KZD 2001 06 30 04 45 00 402-99 D co CCGG 125.010 -999.990 ... R5 2001 07 26 10 12 00 44.4500 75.5700 412.00 407.00 5.00 69993 KZD 2001 07 07 04 10 00 4753-91 D co CCGG 125.630 -999.990 ... R5 2001 07 25 14 59 00 44.4500 75.5700 412.00 407.00 5.00 69994 KZD 2001 07 07 04 10 00 4754-91 D co CCGG 124.370 -999.990 ... R5 2001 07 25 15 12 00 44.4500 75.5700 412.00 407.00 5.00 69995 KZD 2001 07 15 03 55 00 35-91 D co CCGG 100.770 -999.990 ... R5 2001 08 06 11 48 00 44.4500 75.5700 412.00 407.00 5.00 69996 KZD 2001 07 15 03 55 00 36-91 D co CCGG 99.460 -999.990 ... R5 2001 08 06 12 01 00 44.4500 75.5700 412.00 407.00 5.00 69997 KZD 2001 07 22 03 30 00 121-91 D co CCGG 123.030 -999.990 ... R5 2001 08 06 12 40 00 44.4500 75.5700 412.00 407.00 5.00 69998 KZD 2001 07 22 03 30 00 122-91 D co CCGG 120.780 -999.990 ... R5 2001 08 06 12 53 00 44.4500 75.5700 412.00 407.00 5.00 69999 KZD 2001 07 28 03 45 00 421-99 D co CCGG 107.110 -999.990 ... R5 2001 08 21 11 11 00 44.4500 75.5700 412.00 407.00 5.00 70000 KZD 2001 07 28 03 45 00 422-99 D co CCGG 106.720 -999.990 ... R5 2001 08 21 11 24 00 44.4500 75.5700 412.00 407.00 5.00 70001 KZD 2001 08 04 03 50 00 611-91 D co CCGG 113.280 -999.990 ... R5 2001 08 21 10 45 00 44.4500 75.5700 412.00 407.00 5.00 70002 KZD 2001 08 04 03 50 00 612-91 D co CCGG 114.620 -999.990 ... R5 2001 08 21 10 58 00 44.4500 75.5700 412.00 407.00 5.00 70003 KZD 2001 08 11 04 55 00 4539-91 D co CCGG 123.990 -999.990 ... R5 2001 09 06 09 55 00 44.4500 75.5700 412.00 407.00 5.00 70004 KZD 2001 08 11 04 55 00 4540-91 D co CCGG 125.180 -999.990 ... R5 2001 09 06 10 08 00 44.4500 75.5700 412.00 407.00 5.00 70005 KZD 2001 08 18 04 10 00 1379-91 D co CCGG 152.690 -999.990 ... R5 2001 09 06 10 21 00 44.4500 75.5700 412.00 407.00 5.00 70006 KZD 2001 08 18 04 10 00 1380-91 D co CCGG 151.330 -999.990 ... R5 2001 09 06 10 34 00 44.4500 75.5700 412.00 407.00 5.00 70007 KZD 2001 08 25 04 20 00 1117-91 D co CCGG 150.780 -999.990 ... R5 2001 09 24 16 05 00 44.4500 75.5700 412.00 407.00 5.00 70008 KZD 2001 08 25 04 20 00 1118-91 D co CCGG 149.260 -999.990 ... R5 2001 09 24 16 18 00 44.4500 75.5700 412.00 407.00 5.00 70009 KZD 2001 09 01 04 00 00 4067-91 D co CCGG 118.160 -999.990 ... R5 2001 09 24 14 45 00 44.4500 75.5700 412.00 407.00 5.00 70010 KZD 2001 09 01 04 00 00 4068-91 D co CCGG 117.410 -999.990 ... R5 2001 09 24 14 58 00 44.4500 75.5700 412.00 407.00 5.00 70011 KZD 2001 09 08 04 35 00 443-91 D co CCGG 146.800 -999.990 ... R5 2001 10 16 15 01 00 44.4500 75.5700 412.00 407.00 5.00 70012 KZD 2001 09 08 04 35 00 444-91 D co CCGG 146.070 -999.990 ... R5 2001 10 16 15 15 00 44.4500 75.5700 412.00 407.00 5.00 70013 KZD 2001 09 15 03 50 00 1723-91 D co CCGG 108.020 -999.990 ... R5 2001 10 16 15 28 00 44.4500 75.5700 412.00 407.00 5.00 70014 KZD 2001 09 15 03 50 00 1724-91 D co CCGG 107.860 -999.990 ... R5 2001 10 16 15 41 00 44.4500 75.5700 412.00 407.00 5.00 70015 KZD 2001 09 22 03 45 00 4119-91 D co CCGG 101.970 -999.990 ... R5 2001 10 23 17 03 00 44.4500 75.5700 412.00 407.00 5.00 70016 KZD 2001 09 22 03 45 00 4120-91 D co CCGG 103.150 -999.990 ... R5 2001 10 23 17 16 00 44.4500 75.5700 412.00 407.00 5.00 70017 KZD 2001 09 29 04 00 00 4139-91 D co CCGG 119.550 -999.990 ... R5 2001 10 23 10 46 00 44.4500 75.5700 412.00 407.00 5.00 70018 KZD 2001 09 29 04 00 00 4140-91 D co CCGG 119.250 -999.990 ... R5 2001 10 23 10 59 00 44.4500 75.5700 412.00 407.00 5.00 70019 KZD 2001 10 06 03 50 00 4095-91 D co CCGG 114.760 -999.990 ... R5 2001 11 05 11 42 00 44.4500 75.5700 412.00 407.00 5.00 70020 KZD 2001 10 06 03 50 00 4096-91 D co CCGG 114.650 -999.990 ... R5 2001 11 05 11 55 00 44.4500 75.5700 412.00 407.00 5.00 70021 KZD 2001 10 13 03 25 00 275-91 D co CCGG 122.150 -999.990 ... R5 2001 11 05 13 00 00 44.4500 75.5700 412.00 407.00 5.00 70022 KZD 2001 10 13 03 25 00 276-91 D co CCGG 122.380 -999.990 ... R5 2001 11 05 13 13 00 44.4500 75.5700 412.00 407.00 5.00 70023 KZD 2001 10 20 03 40 00 1685-91 D co CCGG 118.640 -999.990 ... R5 2002 01 04 12 15 00 44.4500 75.5700 412.00 407.00 5.00 70024 KZD 2001 10 20 03 40 00 1686-91 D co CCGG 119.430 -999.990 ... R5 2002 01 04 12 29 00 44.4500 75.5700 412.00 407.00 5.00 70025 KZD 2001 10 27 03 35 00 117-98 D co CCGG 125.910 -999.990 ... R5 2002 01 04 12 42 00 44.4500 75.5700 412.00 407.00 5.00 70026 KZD 2001 10 27 03 35 00 118-98 D co CCGG 125.210 -999.990 ... R5 2002 01 04 12 55 00 44.4500 75.5700 412.00 407.00 5.00 70027 KZD 2001 11 03 04 25 00 4511-91 D co CCGG 108.730 -999.990 ... R5 2002 01 10 14 40 00 44.4500 75.5700 412.00 407.00 5.00 70028 KZD 2001 11 03 04 25 00 4512-91 D co CCGG 107.190 -999.990 ... R5 2002 01 10 14 53 00 44.4500 75.5700 412.00 407.00 5.00 70029 KZD 2001 11 10 05 05 00 4245-91 D co CCGG 159.050 -999.990 ... R5 2002 01 10 14 14 00 44.4500 75.5700 412.00 407.00 5.00 70030 KZD 2001 11 10 05 05 00 4246-91 D co CCGG 159.520 -999.990 ... R5 2002 01 10 14 27 00 44.4500 75.5700 412.00 407.00 5.00 70031 KZD 2001 11 18 05 45 00 4135-91 D co CCGG 159.800 -999.990 ... R5 2002 01 03 12 43 00 44.4500 75.5700 412.00 407.00 5.00 70032 KZD 2001 11 18 05 45 00 4136-91 D co CCGG 161.390 -999.990 ... R5 2002 01 03 12 56 00 44.4500 75.5700 412.00 407.00 5.00 70033 KZD 2001 11 24 04 50 00 4291-91 D co CCGG 121.150 -999.990 ... R5 2002 01 03 12 17 00 44.4500 75.5700 412.00 407.00 5.00 70034 KZD 2001 11 24 04 50 00 4292-91 D co CCGG 119.840 -999.990 ... R5 2002 01 03 12 30 00 44.4500 75.5700 412.00 407.00 5.00 70035 KZD 2001 12 01 05 40 00 161-99 D co CCGG 182.010 -999.990 ... R5 2002 01 04 11 23 00 44.4500 75.5700 412.00 407.00 5.00 70036 KZD 2001 12 01 05 40 00 162-99 D co CCGG 181.600 -999.990 ... R5 2002 01 04 11 36 00 44.4500 75.5700 412.00 407.00 5.00 70037 KZD 2001 12 08 05 40 00 181-99 D co CCGG 272.620 -999.990 P.C R5 2002 01 04 11 49 00 44.4500 75.5700 412.00 407.00 5.00 70038 KZD 2001 12 08 05 40 00 182-99 D co CCGG 265.610 -999.990 P.C R5 2002 01 04 12 02 00 44.4500 75.5700 412.00 407.00 5.00 70039 KZD 2002 02 04 05 30 00 4291-91 D co CCGG 214.930 -999.990 ... R5 2002 03 11 14 47 00 44.4500 75.5700 412.00 407.00 5.00 70040 KZD 2002 02 04 05 30 00 4292-91 D co CCGG 216.410 -999.990 ... R5 2002 03 11 15 00 00 44.4500 75.5700 412.00 407.00 5.00 70041 KZD 2002 02 09 05 40 00 4187-91 D co CCGG 211.250 -999.990 ... R5 2002 03 11 13 28 00 44.4500 75.5700 412.00 407.00 5.00 70042 KZD 2002 02 09 05 40 00 4188-91 D co CCGG 210.820 -999.990 ... R5 2002 03 11 13 41 00 44.4500 75.5700 412.00 407.00 5.00 70043 KZD 2002 02 16 05 50 00 529-91 D co CCGG 145.370 -999.990 ... R5 2002 03 18 11 32 00 44.4500 75.5700 412.00 407.00 5.00 70044 KZD 2002 02 16 05 50 00 530-91 D co CCGG 144.200 -999.990 ... R5 2002 03 18 11 45 00 44.4500 75.5700 412.00 407.00 5.00 70045 KZD 2002 02 23 04 45 00 593-91 D co CCGG 187.020 -999.990 ... R5 2002 03 18 11 58 00 44.4500 75.5700 412.00 407.00 5.00 70046 KZD 2002 02 23 04 45 00 594-91 D co CCGG 186.860 -999.990 ... R5 2002 03 18 12 11 00 44.4500 75.5700 412.00 407.00 5.00 70047 KZD 2002 03 02 04 40 00 4619-91 D co CCGG 167.130 -999.990 ... R5 2002 04 03 13 05 00 44.4500 75.5700 412.00 407.00 5.00 70048 KZD 2002 03 02 04 40 00 4620-91 D co CCGG 166.900 -999.990 ... R5 2002 04 03 13 18 00 44.4500 75.5700 412.00 407.00 5.00 70049 KZD 2002 03 09 04 30 00 145-91 D co CCGG 179.310 -999.990 ... R5 2002 04 03 13 34 00 44.4500 75.5700 412.00 407.00 5.00 70050 KZD 2002 03 09 04 30 00 146-91 D co CCGG 179.710 -999.990 ... R5 2002 04 03 13 47 00 44.4500 75.5700 412.00 407.00 5.00 70051 KZD 2002 03 16 04 10 00 555-99 D co CCGG 163.790 -999.990 ... R5 2002 04 09 12 26 00 44.4500 75.5700 412.00 407.00 5.00 70052 KZD 2002 03 16 04 10 00 556-99 D co CCGG 161.820 -999.990 ... R5 2002 04 09 12 39 00 44.4500 75.5700 412.00 407.00 5.00 70053 KZD 2002 03 23 04 30 00 531-99 D co CCGG 131.910 -999.990 ... R5 2002 04 09 14 12 00 44.4500 75.5700 412.00 407.00 5.00 70054 KZD 2002 03 23 04 30 00 532-99 D co CCGG 132.150 -999.990 ... R5 2002 04 09 14 25 00 44.4500 75.5700 412.00 407.00 5.00 70055 KZD 2002 03 30 04 45 00 4657-91 D co CCGG 119.700 -999.990 P.. R5 2002 04 23 13 15 00 44.4500 75.5700 412.00 407.00 5.00 70056 KZD 2002 03 30 04 45 00 4658-91 D co CCGG 114.500 -999.990 P.. R5 2002 04 23 13 28 00 44.4500 75.5700 412.00 407.00 5.00 70057 KZD 2002 04 06 03 00 00 4237-91 D co CCGG 159.640 -999.990 ... R5 2002 04 23 14 34 00 44.4500 75.5700 412.00 407.00 5.00 70058 KZD 2002 04 06 03 00 00 4238-91 D co CCGG 158.540 -999.990 ... R5 2002 04 23 14 47 00 44.4500 75.5700 412.00 407.00 5.00 70059 KZD 2002 04 14 02 55 00 641-91 D co CCGG 139.970 -999.990 ... R5 2002 05 09 14 48 00 44.4500 75.5700 412.00 407.00 5.00 70060 KZD 2002 04 14 02 55 00 642-91 D co CCGG 139.470 -999.990 ... R5 2002 05 09 15 01 00 44.4500 75.5700 412.00 407.00 5.00 70061 KZD 2002 04 20 03 45 00 15-91 D co CCGG 160.020 -999.990 ... R5 2002 05 09 14 22 00 44.4500 75.5700 412.00 407.00 5.00 70062 KZD 2002 04 20 03 45 00 16-91 D co CCGG 159.460 -999.990 ... R5 2002 05 09 14 35 00 44.4500 75.5700 412.00 407.00 5.00 70063 KZD 2002 04 27 03 05 00 163-98 D co CCGG 137.210 -999.990 ... R5 2002 06 03 14 32 00 44.4500 75.5700 412.00 407.00 5.00 70064 KZD 2002 04 27 03 05 00 164-98 D co CCGG 136.290 -999.990 ... R5 2002 06 03 14 45 00 44.4500 75.5700 412.00 407.00 5.00 70065 KZD 2002 05 04 03 05 00 4429-91 D co CCGG 176.050 -999.990 ... R5 2002 06 03 14 06 00 44.4500 75.5700 412.00 407.00 5.00 70066 KZD 2002 05 04 03 05 00 4430-91 D co CCGG 174.700 -999.990 ... R5 2002 06 03 14 19 00 44.4500 75.5700 412.00 407.00 5.00 70067 KZD 2002 05 11 02 50 00 353-99 D co CCGG 135.760 -999.990 ... R5 2002 06 17 15 05 00 44.4500 75.5700 412.00 407.00 5.00 70068 KZD 2002 05 11 02 50 00 354-99 D co CCGG 132.880 -999.990 ... R5 2002 06 17 15 18 00 44.4500 75.5700 412.00 407.00 5.00 70069 KZD 2002 05 18 03 20 00 4203-91 D co CCGG 128.490 -999.990 ... R5 2002 06 17 15 31 00 44.4500 75.5700 412.00 407.00 5.00 70070 KZD 2002 05 18 03 20 00 4204-91 D co CCGG 128.130 -999.990 ... R5 2002 06 17 15 44 00 44.4500 75.5700 412.00 407.00 5.00 70071 KZD 2002 05 25 02 45 00 1779-91 D co CCGG 121.720 -999.990 ... R5 2002 06 20 16 50 00 44.4500 75.5700 412.00 407.00 5.00 70072 KZD 2002 05 25 02 45 00 1780-91 D co CCGG 120.190 -999.990 ... R5 2002 06 20 17 03 00 44.4500 75.5700 412.00 407.00 5.00 70073 KZD 2002 06 01 03 00 00 1757-91 D co CCGG 109.160 -999.990 ... R5 2002 06 20 14 32 00 44.4500 75.5700 412.00 407.00 5.00 70074 KZD 2002 06 01 03 00 00 1758-91 D co CCGG 108.780 -999.990 ... R5 2002 06 20 14 45 00 44.4500 75.5700 412.00 407.00 5.00 70075 KZD 2002 06 08 02 40 00 4501-91 D co CCGG 110.970 -999.990 ... R5 2002 07 10 09 51 00 44.4500 75.5700 412.00 407.00 5.00 70076 KZD 2002 06 08 02 40 00 4502-91 D co CCGG 111.210 -999.990 ... R5 2002 07 10 10 04 00 44.4500 75.5700 412.00 407.00 5.00 70077 KZD 2002 06 15 02 40 00 4967-91 D co CCGG 109.310 -999.990 ... R5 2002 07 10 10 17 00 44.4500 75.5700 412.00 407.00 5.00 70078 KZD 2002 06 15 02 40 00 4968-91 D co CCGG 109.200 -999.990 ... R5 2002 07 10 10 30 00 44.4500 75.5700 412.00 407.00 5.00 70079 KZD 2002 06 22 02 25 00 373-99 D co CCGG 155.540 -999.990 ... R5 2002 07 17 13 43 00 44.4500 75.5700 412.00 407.00 5.00 70080 KZD 2002 06 22 02 25 00 374-99 D co CCGG 157.850 -999.990 ... R5 2002 07 17 13 56 00 44.4500 75.5700 412.00 407.00 5.00 70081 KZD 2002 06 29 02 48 00 1151-91 D co CCGG 109.770 -999.990 P.. R5 2002 07 17 14 09 00 44.4500 75.5700 412.00 407.00 5.00 70082 KZD 2002 06 29 02 48 00 1152-91 D co CCGG 106.250 -999.990 P.. R5 2002 07 17 14 22 00 44.4500 75.5700 412.00 407.00 5.00 70083 KZD 2002 07 06 02 20 00 619-99 D co CCGG 104.950 -999.990 P.. R5 2002 08 06 10 25 00 44.4500 75.5700 412.00 407.00 5.00 70084 KZD 2002 07 06 02 20 00 620-99 D co CCGG 125.340 -999.990 P.. R5 2002 08 06 10 38 00 44.4500 75.5700 412.00 407.00 5.00 70085 KZD 2002 07 13 03 25 00 617-99 D co CCGG 155.480 -999.990 ... R5 2002 08 06 11 19 00 44.4500 75.5700 412.00 407.00 5.00 70086 KZD 2002 07 13 03 25 00 618-99 D co CCGG 153.580 -999.990 ... R5 2002 08 06 11 32 00 44.4500 75.5700 412.00 407.00 5.00 70087 KZD 2002 08 03 02 30 00 1137-91 D co CCGG 122.510 -999.990 ... R5 2002 08 23 10 53 00 44.4500 75.5700 412.00 407.00 5.00 70092 KZD 2002 08 03 02 30 00 1138-91 D co CCGG 122.280 -999.990 ... R5 2002 08 23 11 06 00 44.4500 75.5700 412.00 407.00 5.00 70093 KZD 2002 08 10 02 25 00 1377-91 D co CCGG 168.140 -999.990 ... R5 2002 08 23 11 19 00 44.4500 75.5700 412.00 407.00 5.00 70094 KZD 2002 08 10 02 25 00 1378-91 D co CCGG 167.430 -999.990 ... R5 2002 08 23 11 32 00 44.4500 75.5700 412.00 407.00 5.00 70095 KZD 2002 08 18 02 30 00 4189-91 D co CCGG 175.320 -999.990 ... R5 2002 09 12 15 59 00 44.4500 75.5700 412.00 407.00 5.00 70096 KZD 2002 08 18 02 30 00 4190-91 D co CCGG 174.430 -999.990 ... R5 2002 09 12 16 12 00 44.4500 75.5700 412.00 407.00 5.00 70097 KZD 2002 08 24 02 30 00 653-91 D co CCGG 121.000 -999.990 ... R5 2002 09 12 16 25 00 44.4500 75.5700 412.00 407.00 5.00 70098 KZD 2002 08 24 02 30 00 654-91 D co CCGG 121.220 -999.990 ... R5 2002 09 12 16 38 00 44.4500 75.5700 412.00 407.00 5.00 70099 KZD 2002 08 31 02 30 00 4673-91 D co CCGG 168.470 -999.990 ... R5 2002 09 23 13 51 00 44.4500 75.5700 412.00 407.00 5.00 70100 KZD 2002 08 31 02 30 00 4674-91 D co CCGG 167.710 -999.990 ... R5 2002 09 23 14 04 00 44.4500 75.5700 412.00 407.00 5.00 70101 KZD 2002 09 07 02 45 00 731-91 D co CCGG 117.100 -999.990 ... R5 2002 09 23 14 43 00 44.4500 75.5700 412.00 407.00 5.00 70102 KZD 2002 09 07 02 45 00 732-91 D co CCGG 115.520 -999.990 ... R5 2002 09 23 14 56 00 44.4500 75.5700 412.00 407.00 5.00 70103 KZD 2002 09 14 02 40 00 127-99 D co CCGG 180.150 -999.990 ... R5 2002 10 10 11 15 00 44.4500 75.5700 412.00 407.00 5.00 70104 KZD 2002 09 14 02 40 00 128-99 D co CCGG 179.240 -999.990 ... R5 2002 10 10 11 28 00 44.4500 75.5700 412.00 407.00 5.00 70105 KZD 2002 09 21 02 35 00 1015-91 D co CCGG 140.850 -999.990 ... R5 2002 10 10 10 49 00 44.4500 75.5700 412.00 407.00 5.00 70106 KZD 2002 09 21 02 35 00 1016-91 D co CCGG 142.080 -999.990 ... R5 2002 10 10 11 02 00 44.4500 75.5700 412.00 407.00 5.00 70107 KZD 2002 09 28 02 30 00 21-91 D co CCGG 205.620 -999.990 .X. R5 2002 10 25 12 57 00 44.4500 75.5700 412.00 407.00 5.00 70108 KZD 2002 09 28 02 30 00 22-91 D co CCGG 203.740 -999.990 .X. R5 2002 10 25 13 10 00 44.4500 75.5700 412.00 407.00 5.00 70109 KZD 2002 10 05 02 40 00 153-91 D co CCGG 159.230 -999.990 ... R5 2002 10 25 12 31 00 44.4500 75.5700 412.00 407.00 5.00 70110 KZD 2002 10 05 02 40 00 154-91 D co CCGG 160.320 -999.990 ... R5 2002 10 25 12 44 00 44.4500 75.5700 412.00 407.00 5.00 70111 KZD 2002 10 12 02 45 00 547-91 D co CCGG 121.440 -999.990 ... R5 2002 10 29 11 01 00 44.4500 75.5700 412.00 407.00 5.00 70112 KZD 2002 10 12 02 45 00 548-91 D co CCGG 122.070 -999.990 ... R5 2002 10 29 11 14 00 44.4500 75.5700 412.00 407.00 5.00 70113 KZD 2002 10 19 03 35 00 1773-91 D co CCGG 134.720 -999.990 ... R5 2002 11 14 15 07 00 44.4500 75.5700 412.00 407.00 5.00 70114 KZD 2002 10 19 03 35 00 1774-91 D co CCGG 134.920 -999.990 ... R5 2002 11 14 15 20 00 44.4500 75.5700 412.00 407.00 5.00 70115 KZD 2002 10 26 02 25 00 4427-91 D co CCGG 99.770 -999.990 ... R5 2002 11 14 15 33 00 44.4500 75.5700 412.00 407.00 5.00 70116 KZD 2002 10 26 02 25 00 4428-91 D co CCGG 99.520 -999.990 ... R5 2002 11 14 15 46 00 44.4500 75.5700 412.00 407.00 5.00 70117 KZD 2002 11 02 03 10 00 4883-91 D co CCGG 114.630 -999.990 ... R5 2002 12 02 11 56 00 44.4500 75.5700 412.00 407.00 5.00 70118 KZD 2002 11 02 03 10 00 4884-91 D co CCGG 115.960 -999.990 ... R5 2002 12 02 12 09 00 44.4500 75.5700 412.00 407.00 5.00 70119 KZD 2002 11 09 03 40 00 135-98 D co CCGG 160.670 -999.990 ... R5 2002 12 02 13 14 00 44.4500 75.5700 412.00 407.00 5.00 70120 KZD 2002 11 09 03 40 00 136-98 D co CCGG 161.200 -999.990 ... R5 2002 12 02 13 27 00 44.4500 75.5700 412.00 407.00 5.00 70121 KZD 2002 11 16 03 05 00 653-99 D co CCGG 135.960 -999.990 ... R5 2002 12 10 11 54 00 44.4500 75.5700 412.00 407.00 5.00 70122 KZD 2002 11 16 03 05 00 654-99 D co CCGG 137.140 -999.990 ... R5 2002 12 10 12 07 00 44.4500 75.5700 412.00 407.00 5.00 70123 KZD 2002 11 23 03 05 00 4961-91 D co CCGG 148.740 -999.990 ... R5 2002 12 10 13 12 00 44.4500 75.5700 412.00 407.00 5.00 70124 KZD 2002 11 23 03 05 00 4962-91 D co CCGG 148.920 -999.990 ... R5 2002 12 10 13 26 00 44.4500 75.5700 412.00 407.00 5.00 70125 KZD 2002 11 30 03 10 00 1627-91 D co CCGG 104.560 -999.990 ... R5 2002 12 23 12 46 00 44.4500 75.5700 412.00 407.00 5.00 70126 KZD 2002 11 30 03 10 00 1628-91 D co CCGG 103.800 -999.990 ... R5 2002 12 23 12 59 00 44.4500 75.5700 412.00 407.00 5.00 70127 KZD 2002 12 07 03 40 00 4947-91 D co CCGG 308.480 -999.990 .NC R5 2002 12 23 13 12 00 44.4500 75.5700 412.00 407.00 5.00 70128 KZD 2002 12 07 03 40 00 4948-91 D co CCGG 310.470 -999.990 .NC R5 2002 12 23 13 25 00 44.4500 75.5700 412.00 407.00 5.00 70129 KZD 2002 12 14 04 10 00 23-99 D co CCGG 164.770 -999.990 ... R5 2003 01 15 10 44 00 44.4500 75.5700 412.00 407.00 5.00 70130 KZD 2002 12 14 04 10 00 24-99 D co CCGG 165.600 -999.990 ... R5 2003 01 15 10 57 00 44.4500 75.5700 412.00 407.00 5.00 70131 KZD 2002 12 21 03 45 00 4835-98 D co CCGG 183.020 -999.990 ... R5 2003 01 15 13 27 00 44.4500 75.5700 412.00 407.00 5.00 70132 KZD 2002 12 21 03 45 00 4836-98 D co CCGG 182.870 -999.990 ... R5 2003 01 15 13 40 00 44.4500 75.5700 412.00 407.00 5.00 70133 KZD 2002 12 28 04 10 00 1427-91 D co CCGG 185.350 -999.990 ... R5 2003 02 05 16 17 00 44.4500 75.5700 412.00 407.00 5.00 70134 KZD 2002 12 28 04 10 00 1428-91 D co CCGG 185.990 -999.990 ... R5 2003 02 05 16 30 00 44.4500 75.5700 412.00 407.00 5.00 70135 KZD 2003 01 11 03 40 00 4761-91 D co CCGG 176.900 -999.990 ... R5 2003 02 05 16 43 00 44.4500 75.5700 412.00 407.00 5.00 70136 KZD 2003 01 11 03 40 00 4762-91 D co CCGG 176.640 -999.990 ... R5 2003 02 05 16 56 00 44.4500 75.5700 412.00 407.00 5.00 70137 KZD 2003 01 18 03 35 00 4331-91 D co CCGG 186.120 -999.990 ... R5 2003 02 10 15 16 00 44.4500 75.5700 412.00 407.00 5.00 70138 KZD 2003 01 18 03 35 00 4332-91 D co CCGG 185.970 -999.990 ... R5 2003 02 10 15 29 00 44.4500 75.5700 412.00 407.00 5.00 70139 KZD 2003 01 25 04 20 00 1475-91 D co CCGG 173.840 -999.990 ... R5 2003 02 10 14 23 00 44.4500 75.5700 412.00 407.00 5.00 70140 KZD 2003 01 25 04 20 00 1476-91 D co CCGG 173.620 -999.990 ... R5 2003 02 10 14 36 00 44.4500 75.5700 412.00 407.00 5.00 70141 KZD 2003 02 01 03 50 00 4447-91 D co CCGG 164.410 -999.990 ... R5 2003 03 05 11 02 00 44.4500 75.5700 412.00 407.00 5.00 70142 KZD 2003 02 01 03 50 00 4448-91 D co CCGG 162.830 -999.990 ... R5 2003 03 05 11 15 00 44.4500 75.5700 412.00 407.00 5.00 70143 KZD 2003 02 08 04 05 00 119-91 D co CCGG 229.680 -999.990 ..C R5 2003 03 05 10 36 00 44.4500 75.5700 412.00 407.00 5.00 70144 KZD 2003 02 08 04 05 00 120-91 D co CCGG 230.550 -999.990 ..C R5 2003 03 05 10 49 00 44.4500 75.5700 412.00 407.00 5.00 70145 KZD 2003 02 16 03 50 00 431-99 D co CCGG 191.360 -999.990 ... R5 2003 03 11 16 09 00 44.4500 75.5700 412.00 407.00 5.00 70146 KZD 2003 02 16 03 50 00 432-99 D co CCGG 192.380 -999.990 ... R5 2003 03 11 16 22 00 44.4500 75.5700 412.00 407.00 5.00 70147 KZD 2003 02 23 04 10 00 4991-91 D co CCGG 198.780 -999.990 ... R5 2003 03 11 16 35 00 44.4500 75.5700 412.00 407.00 5.00 70148 KZD 2003 02 23 04 10 00 4992-91 D co CCGG 200.130 -999.990 ... R5 2003 03 11 16 48 00 44.4500 75.5700 412.00 407.00 5.00 70149 KZD 2003 03 02 03 45 00 379-99 D co CCGG 180.350 -999.990 ... R5 2003 04 09 09 42 00 44.4500 75.5700 412.00 407.00 5.00 70150 KZD 2003 03 02 03 45 00 380-99 D co CCGG 180.790 -999.990 ... R5 2003 04 09 09 55 00 44.4500 75.5700 412.00 407.00 5.00 70151 KZD 2003 03 09 03 35 00 275-99 D co CCGG 206.630 -999.990 ... R5 2003 04 09 10 34 00 44.4500 75.5700 412.00 407.00 5.00 70152 KZD 2003 03 09 03 35 00 276-99 D co CCGG 207.570 -999.990 ... R5 2003 04 09 10 47 00 44.4500 75.5700 412.00 407.00 5.00 70153 KZD 2003 03 16 03 30 00 433-99 D co CCGG 217.040 -999.990 ... R5 2003 04 11 14 26 00 44.4500 75.5700 412.00 407.00 5.00 70154 KZD 2003 03 16 03 30 00 434-99 D co CCGG 217.180 -999.990 ... R5 2003 04 11 14 39 00 44.4500 75.5700 412.00 407.00 5.00 70155 KZD 2003 03 23 03 20 00 4311-91 D co CCGG 167.930 -999.990 ... R5 2003 04 11 14 00 00 44.4500 75.5700 412.00 407.00 5.00 70156 KZD 2003 03 23 03 20 00 4312-91 D co CCGG 168.930 -999.990 ... R5 2003 04 11 14 13 00 44.4500 75.5700 412.00 407.00 5.00 70157 KZD 2003 03 30 02 20 00 397-91 D co CCGG 155.730 -999.990 ... R5 2003 05 05 14 14 00 44.4500 75.5700 412.00 407.00 5.00 70158 KZD 2003 03 30 02 20 00 398-91 D co CCGG 155.800 -999.990 ... R5 2003 05 05 14 27 00 44.4500 75.5700 412.00 407.00 5.00 70159 KZD 2003 04 06 02 15 00 271-91 D co CCGG 145.590 -999.990 ... R5 2003 05 05 12 02 00 44.4500 75.5700 412.00 407.00 5.00 70160 KZD 2003 04 06 02 15 00 272-91 D co CCGG 147.390 -999.990 ... R5 2003 05 05 12 15 00 44.4500 75.5700 412.00 407.00 5.00 70161 KZD 2003 04 12 02 15 00 1119-99 D co CCGG 160.280 -999.990 ... R5 2003 05 12 14 08 00 44.4500 75.5700 412.00 407.00 5.00 70162 KZD 2003 04 12 02 15 00 1120-99 D co CCGG 157.550 -999.990 ... R5 2003 05 12 14 21 00 44.4500 75.5700 412.00 407.00 5.00 70163 KZD 2003 04 19 02 05 00 1143-99 D co CCGG 159.890 -999.990 ... R5 2003 05 12 14 34 00 44.4500 75.5700 412.00 407.00 5.00 70164 KZD 2003 04 19 02 05 00 1144-99 D co CCGG 159.940 -999.990 ... R5 2003 05 12 14 47 00 44.4500 75.5700 412.00 407.00 5.00 70165 KZD 2003 04 27 02 05 00 291-99 D co CCGG 131.460 -999.990 ... R5 2003 05 23 12 48 00 44.4500 75.5700 412.00 407.00 5.00 70166 KZD 2003 04 27 02 05 00 292-99 D co CCGG 131.880 -999.990 ... R5 2003 05 23 13 01 00 44.4500 75.5700 412.00 407.00 5.00 70167 KZD 2003 05 03 02 05 00 4861-91 D co CCGG 139.860 -999.990 ... R5 2003 05 23 13 14 00 44.4500 75.5700 412.00 407.00 5.00 70168 KZD 2003 05 03 02 05 00 4862-91 D co CCGG 137.900 -999.990 ... R5 2003 05 23 13 27 00 44.4500 75.5700 412.00 407.00 5.00 70169 KZD 2003 05 09 02 05 00 651-99 D co CCGG 159.480 -999.990 P.. R5 2003 06 06 11 47 00 44.4500 75.5700 412.00 407.00 5.00 70170 KZD 2003 05 09 02 05 00 652-99 D co CCGG 162.720 -999.990 P.. R5 2003 06 06 12 00 00 44.4500 75.5700 412.00 407.00 5.00 70171 KZD 2003 05 18 02 05 00 239-91 D co CCGG 136.850 -999.990 ... R5 2003 06 06 12 15 00 44.4500 75.5700 412.00 407.00 5.00 70172 KZD 2003 05 18 02 05 00 240-91 D co CCGG 137.190 -999.990 ... R5 2003 06 06 12 28 00 44.4500 75.5700 412.00 407.00 5.00 70173 KZD 2003 05 24 02 20 00 571-99 D co CCGG 133.890 -999.990 ... R5 2003 07 03 13 11 00 44.4500 75.5700 412.00 407.00 5.00 70174 KZD 2003 05 24 02 20 00 572-99 D co CCGG 132.380 -999.990 ... R5 2003 07 03 13 24 00 44.4500 75.5700 412.00 407.00 5.00 70175 KZD 2003 05 31 02 05 00 891-99 D co CCGG 144.880 -999.990 ... R5 2003 07 03 12 45 00 44.4500 75.5700 412.00 407.00 5.00 70176 KZD 2003 05 31 02 05 00 892-99 D co CCGG 143.570 -999.990 ... R5 2003 07 03 12 58 00 44.4500 75.5700 412.00 407.00 5.00 70177 KZD 2003 06 08 02 10 00 989-99 D co CCGG 131.530 -999.990 ... R5 2003 07 07 09 11 00 44.4500 75.5700 412.00 407.00 5.00 70178 KZD 2003 06 08 02 10 00 990-99 D co CCGG 131.030 -999.990 ... R5 2003 07 07 09 24 00 44.4500 75.5700 412.00 407.00 5.00 70179 KZD 2003 06 15 02 15 00 500-99 D co CCGG 135.710 -999.990 ... R5 2003 07 03 16 31 00 44.4500 75.5700 412.00 407.00 5.00 70180 KZD 2003 06 21 02 05 00 905-99 D co CCGG 130.040 -999.990 ... R5 2003 07 25 12 57 00 44.4500 75.5700 412.00 407.00 5.00 70181 KZD 2003 06 21 02 05 00 906-99 D co CCGG 129.500 -999.990 ... R5 2003 07 25 13 10 00 44.4500 75.5700 412.00 407.00 5.00 70182 KZD 2003 06 29 02 15 00 75-91 D co CCGG 136.960 -999.990 ... R5 2003 07 25 12 31 00 44.4500 75.5700 412.00 407.00 5.00 70183 KZD 2003 06 29 02 15 00 76-91 D co CCGG 137.110 -999.990 ... R5 2003 07 25 12 44 00 44.4500 75.5700 412.00 407.00 5.00 70184 KZD 2003 07 06 02 10 00 4861-91 D co CCGG 168.280 -999.990 ... R5 2003 08 08 11 38 00 44.4500 75.5700 412.00 407.00 5.00 70185 KZD 2003 07 06 02 10 00 4862-91 D co CCGG 169.130 -999.990 ... R5 2003 08 08 11 51 00 44.4500 75.5700 412.00 407.00 5.00 70186 KZD 2003 07 12 02 20 00 1923-91 D co CCGG 135.370 -999.990 ... R5 2003 08 08 11 12 00 44.4500 75.5700 412.00 407.00 5.00 70187 KZD 2003 07 12 02 20 00 1924-91 D co CCGG 135.030 -999.990 ... R5 2003 08 08 11 25 00 44.4500 75.5700 412.00 407.00 5.00 70188 KZD 2003 07 19 02 10 00 903-99 D co CCGG 108.610 -999.990 ... R5 2003 08 11 15 43 00 44.4500 75.5700 412.00 407.00 5.00 70189 KZD 2003 07 19 02 10 00 904-99 D co CCGG 109.420 -999.990 ... R5 2003 08 11 15 56 00 44.4500 75.5700 412.00 407.00 5.00 70190 KZD 2003 07 26 02 30 00 157-91 D co CCGG 110.290 -999.990 ... R5 2003 08 11 16 11 00 44.4500 75.5700 412.00 407.00 5.00 70191 KZD 2003 07 26 02 30 00 158-91 D co CCGG 110.030 -999.990 ... R5 2003 08 11 16 24 00 44.4500 75.5700 412.00 407.00 5.00 70192 KZD 2003 08 02 02 05 00 6835-66 D co CCGG 126.240 -999.990 ... R5 2003 08 26 16 26 00 44.4500 75.5700 412.00 407.00 5.00 70193 KZD 2003 08 02 02 05 00 6836-66 D co CCGG 125.860 -999.990 ... R5 2003 08 26 16 39 00 44.4500 75.5700 412.00 407.00 5.00 70194 KZD 2003 08 10 02 15 00 6727-66 D co CCGG 129.420 -999.990 ... R5 2003 08 26 16 00 00 44.4500 75.5700 412.00 407.00 5.00 70195 KZD 2003 08 10 02 15 00 6728-66 D co CCGG 129.150 -999.990 ... R5 2003 08 26 16 13 00 44.4500 75.5700 412.00 407.00 5.00 70196 KZD 2003 08 17 02 20 00 1699-99 D co CCGG 164.890 -999.990 ... R5 2003 09 12 10 51 00 44.4500 75.5700 412.00 407.00 5.00 70197 KZD 2003 08 17 02 20 00 1700-99 D co CCGG 166.790 -999.990 ... R5 2003 09 12 11 04 00 44.4500 75.5700 412.00 407.00 5.00 70198 KZD 2003 08 23 02 15 00 1697-99 D co CCGG 131.270 -999.990 ... R5 2003 09 12 10 23 00 44.4500 75.5700 412.00 407.00 5.00 70199 KZD 2003 08 23 02 15 00 1698-99 D co CCGG 130.590 -999.990 ... R5 2003 09 12 10 36 00 44.4500 75.5700 412.00 407.00 5.00 70200 KZD 2003 08 30 02 15 00 1801-99 D co CCGG 168.510 -999.990 ... R5 2003 10 01 15 30 00 44.4500 75.5700 412.00 407.00 5.00 70201 KZD 2003 08 30 02 15 00 1802-99 D co CCGG 168.350 -999.990 ... R5 2003 10 01 15 43 00 44.4500 75.5700 412.00 407.00 5.00 70202 KZD 2003 09 06 02 15 00 1803-99 D co CCGG 152.660 -999.990 ... R5 2003 09 30 11 54 00 44.4500 75.5700 412.00 407.00 5.00 70203 KZD 2003 09 06 02 15 00 1804-99 D co CCGG 152.920 -999.990 ... R5 2003 09 30 12 07 00 44.4500 75.5700 412.00 407.00 5.00 70204 KZD 2003 09 13 02 30 00 1937-99 D co CCGG 139.490 -999.990 ... R5 2003 10 16 14 21 00 44.4500 75.5700 412.00 407.00 5.00 70205 KZD 2003 09 13 02 30 00 1938-99 D co CCGG 139.350 -999.990 ... R5 2003 10 16 14 34 00 44.4500 75.5700 412.00 407.00 5.00 70206 KZD 2003 09 20 02 35 00 1439-91 D co CCGG 141.960 -999.990 ... R5 2003 10 14 13 30 00 44.4500 75.5700 412.00 407.00 5.00 70207 KZD 2003 09 20 02 35 00 1440-91 D co CCGG 142.380 -999.990 ... R5 2003 10 14 13 43 00 44.4500 75.5700 412.00 407.00 5.00 70208 KZD 2003 09 27 02 20 00 4603-91 D co CCGG 142.860 -999.990 ... R5 2003 10 14 13 58 00 44.4500 75.5700 412.00 407.00 5.00 70209 KZD 2003 09 27 02 20 00 4604-91 D co CCGG 141.870 -999.990 ... R5 2003 10 14 14 11 00 44.4500 75.5700 412.00 407.00 5.00 70210 KZD 2003 10 04 02 15 00 10-98 D co CCGG 141.770 -999.990 ... R5 2003 11 11 16 43 00 44.4500 75.5700 412.00 407.00 5.00 70212 KZD 2003 10 04 02 15 00 9-98 D co CCGG 141.400 -999.990 ... R5 2003 11 11 16 30 00 44.4500 75.5700 412.00 407.00 5.00 70211 KZD 2003 10 12 03 20 00 19-91 D co CCGG 166.440 -999.990 ... R5 2003 11 11 15 38 00 44.4500 75.5700 412.00 407.00 5.00 70213 KZD 2003 10 12 03 20 00 20-91 D co CCGG 167.220 -999.990 ... R5 2003 11 11 15 51 00 44.4500 75.5700 412.00 407.00 5.00 70214 KZD 2003 10 18 02 10 00 153-98 D co CCGG 149.770 -999.990 ... R5 2003 12 08 13 12 00 44.4500 75.5700 412.00 407.00 5.00 70215 KZD 2003 10 18 02 10 00 154-98 D co CCGG 149.150 -999.990 ... R5 2003 12 08 13 25 00 44.4500 75.5700 412.00 407.00 5.00 70216 KZD 2003 10 25 02 30 00 1934-99 D co CCGG 170.790 -999.990 P.. R5 2003 12 08 13 51 00 44.4500 75.5700 412.00 407.00 5.00 70218 KZD 2003 10 25 02 30 00 89-98 D co CCGG 181.590 -999.990 P.. R5 2003 12 08 13 38 00 44.4500 75.5700 412.00 407.00 5.00 70217 KZD 2003 11 01 03 20 00 2101-99 D co CCGG 147.250 -999.990 ... R5 2003 12 05 12 34 00 44.4500 75.5700 412.00 407.00 5.00 70219 KZD 2003 11 01 03 20 00 2102-99 D co CCGG 146.410 -999.990 ... R5 2003 12 05 12 47 00 44.4500 75.5700 412.00 407.00 5.00 70220 KZD 2003 11 08 03 55 00 1811-99 D co CCGG 152.250 -999.990 ... R5 2003 12 05 13 00 00 44.4500 75.5700 412.00 407.00 5.00 70221 KZD 2003 11 08 03 55 00 1812-99 D co CCGG 151.800 -999.990 ... R5 2003 12 05 13 13 00 44.4500 75.5700 412.00 407.00 5.00 70222 KZD 2003 11 15 03 20 00 589-91 D co CCGG 137.550 -999.990 ... R5 2003 12 17 12 00 00 44.4500 75.5700 412.00 407.00 5.00 70223 KZD 2003 11 15 03 20 00 590-91 D co CCGG 137.490 -999.990 ... R5 2003 12 17 12 13 00 44.4500 75.5700 412.00 407.00 5.00 70224 KZD 2003 11 22 03 25 00 93-98 D co CCGG 167.670 -999.990 ... R5 2003 12 17 12 28 00 44.4500 75.5700 412.00 407.00 5.00 70225 KZD 2003 11 22 03 25 00 94-98 D co CCGG 167.700 -999.990 ... R5 2003 12 17 12 41 00 44.4500 75.5700 412.00 407.00 5.00 70226 KZD 2003 11 29 03 25 00 435-99 D co CCGG 272.240 -999.990 .XC R5 2004 01 28 15 10 00 44.4500 75.5700 412.00 407.00 5.00 70227 KZD 2003 11 29 03 25 00 436-99 D co CCGG 273.160 -999.990 .XC R5 2004 01 28 15 23 00 44.4500 75.5700 412.00 407.00 5.00 70228 KZD 2003 12 07 03 40 00 1861-99 D co CCGG 272.550 -999.990 .XC R5 2004 01 28 13 52 00 44.4500 75.5700 412.00 407.00 5.00 70229 KZD 2003 12 07 03 40 00 1862-99 D co CCGG 272.970 -999.990 .XC R5 2004 01 28 14 05 00 44.4500 75.5700 412.00 407.00 5.00 70230 KZD 2003 12 14 04 20 00 6637-66 D co CCGG 65.270 -999.990 Z.. R5 2004 01 20 12 50 00 44.4500 75.5700 412.00 407.00 5.00 70231 KZD 2003 12 14 04 20 00 6637-66 D co CCGG 304.680 -999.990 Z.C R5 2004 01 20 15 28 00 44.4500 75.5700 412.00 407.00 5.00 70231 KZD 2003 12 14 04 20 00 6638-66 D co CCGG 302.000 -999.990 .XC R5 2004 01 20 13 03 00 44.4500 75.5700 412.00 407.00 5.00 70232 KZD 2003 12 21 03 50 00 17-98 D co CCGG 288.830 -999.990 .XC R5 2004 01 20 13 16 00 44.4500 75.5700 412.00 407.00 5.00 70233 KZD 2003 12 21 03 50 00 18-98 D co CCGG 290.300 -999.990 .XC R5 2004 01 20 13 29 00 44.4500 75.5700 412.00 407.00 5.00 70234 KZD 2003 12 28 03 55 00 1187-99 D co CCGG 171.560 -999.990 ... R5 2004 02 02 14 23 00 44.4500 75.5700 412.00 407.00 5.00 70235 KZD 2003 12 28 03 55 00 1188-99 D co CCGG 171.800 -999.990 ... R5 2004 02 02 14 36 00 44.4500 75.5700 412.00 407.00 5.00 70236 KZD 2004 01 03 03 45 00 2135-99 D co CCGG 171.280 -999.990 ... R5 2004 02 02 14 49 00 44.4500 75.5700 412.00 407.00 5.00 70237 KZD 2004 01 03 03 45 00 2136-99 D co CCGG 171.440 -999.990 ... R5 2004 02 02 15 02 00 44.4500 75.5700 412.00 407.00 5.00 70238 KZD 2004 01 10 04 40 00 1341-99 D co CCGG 193.260 -999.990 P.. R5 2004 02 23 16 06 00 44.4500 75.5700 412.00 407.00 5.00 70239 KZD 2004 01 10 04 40 00 1342-99 D co CCGG 197.510 -999.990 P.. R5 2004 02 23 16 19 00 44.4500 75.5700 412.00 407.00 5.00 70240 KZD 2004 01 18 04 35 00 123-91 D co CCGG 193.190 -999.990 ... R5 2004 02 23 15 40 00 44.4500 75.5700 412.00 407.00 5.00 70241 KZD 2004 01 18 04 35 00 124-91 D co CCGG 193.870 -999.990 ... R5 2004 02 23 15 53 00 44.4500 75.5700 412.00 407.00 5.00 70242 KZD 2004 01 25 04 40 00 2103-99 D co CCGG 208.520 -999.990 ... R5 2004 02 23 17 00 00 44.4500 75.5700 412.00 407.00 5.00 70243 KZD 2004 01 25 04 40 00 2104-99 D co CCGG 209.230 -999.990 ... R5 2004 02 23 17 13 00 44.4500 75.5700 412.00 407.00 5.00 70244 KZD 2004 01 31 04 10 00 1335-99 D co CCGG 216.460 -999.990 ... R5 2004 02 23 16 32 00 44.4500 75.5700 412.00 407.00 5.00 70245 KZD 2004 01 31 04 10 00 1336-99 D co CCGG 217.920 -999.990 ... R5 2004 02 23 16 45 00 44.4500 75.5700 412.00 407.00 5.00 70246 KZD 2004 02 08 04 35 00 1827-99 D co CCGG 206.690 -999.990 ... R5 2004 03 08 13 13 00 44.4500 75.5700 412.00 407.00 5.00 70247 KZD 2004 02 08 04 35 00 1828-99 D co CCGG 206.140 -999.990 ... R5 2004 03 08 13 26 00 44.4500 75.5700 412.00 407.00 5.00 70248 KZD 2004 02 15 04 55 00 1281-99 D co CCGG 205.080 -999.990 ... R5 2004 03 08 12 45 00 44.4500 75.5700 412.00 407.00 5.00 70249 KZD 2004 02 15 04 55 00 1282-99 D co CCGG 205.140 -999.990 ... R5 2004 03 08 12 58 00 44.4500 75.5700 412.00 407.00 5.00 70250 KZD 2004 02 22 03 50 00 2807-99 D co CCGG 189.980 -999.990 ... R5 2004 03 17 10 20 00 44.4500 75.5700 412.00 407.00 5.00 70251 KZD 2004 02 29 03 35 00 2811-99 D co CCGG 156.070 -999.990 ... R5 2004 03 16 14 23 00 44.4500 75.5700 412.00 407.00 5.00 70252 KZD 2004 02 29 03 35 00 2812-99 D co CCGG 156.510 -999.990 ... R5 2004 03 16 14 36 00 44.4500 75.5700 412.00 407.00 5.00 70253 KZD 2004 03 06 04 25 00 2577-99 D co CCGG 216.030 -999.990 ... R5 2004 04 07 15 44 00 44.4500 75.5700 412.00 407.00 5.00 70254 KZD 2004 03 06 04 25 00 2578-99 D co CCGG 216.070 -999.990 ... R5 2004 04 07 15 57 00 44.4500 75.5700 412.00 407.00 5.00 70255 KZD 2004 03 14 04 35 00 707-99 D co CCGG 149.890 -999.990 ... R5 2004 04 07 14 52 00 44.4500 75.5700 412.00 407.00 5.00 70256 KZD 2004 03 14 04 35 00 708-99 D co CCGG 149.760 -999.990 ... R5 2004 04 07 15 05 00 44.4500 75.5700 412.00 407.00 5.00 70257 KZD 2004 03 21 04 30 00 2767-99 D co CCGG 172.730 -999.990 ... R5 2004 04 09 15 41 00 44.4500 75.5700 412.00 407.00 5.00 70258 KZD 2004 03 21 04 30 00 2768-99 D co CCGG 172.250 -999.990 ... R5 2004 04 09 15 55 00 44.4500 75.5700 412.00 407.00 5.00 70259 KZD 2004 03 27 03 20 00 2766-99 D co CCGG 162.320 -999.990 ... R5 2004 04 09 16 08 00 44.4500 75.5700 412.00 407.00 5.00 70260 KZD 2004 04 04 02 45 00 6029-66 D co CCGG 195.650 -999.990 ... R5 2004 05 18 14 21 00 44.4500 75.5700 412.00 407.00 5.00 70261 KZD 2004 04 04 02 45 00 6030-66 D co CCGG 195.980 -999.990 ... R5 2004 05 18 14 34 00 44.4500 75.5700 412.00 407.00 5.00 70262 KZD 2004 04 11 02 25 00 3149-99 D co CCGG 131.420 -999.990 ... R5 2004 05 18 13 55 00 44.4500 75.5700 412.00 407.00 5.00 70263 KZD 2004 04 11 02 25 00 3150-99 D co CCGG 129.960 -999.990 ... R5 2004 05 18 14 08 00 44.4500 75.5700 412.00 407.00 5.00 70264 KZD 2004 04 17 02 25 00 1409-99 D co CCGG 156.640 -999.990 ... R5 2004 05 24 15 44 00 44.4500 75.5700 412.00 407.00 5.00 70265 KZD 2004 04 17 02 25 00 1410-99 D co CCGG 155.180 -999.990 ... R5 2004 05 24 15 57 00 44.4500 75.5700 412.00 407.00 5.00 70266 KZD 2004 04 24 02 40 00 241-99 D co CCGG 152.530 -999.990 ... R5 2004 05 24 15 18 00 44.4500 75.5700 412.00 407.00 5.00 70267 KZD 2004 04 24 02 40 00 242-99 D co CCGG 152.020 -999.990 ... R5 2004 05 24 15 31 00 44.4500 75.5700 412.00 407.00 5.00 70268 KZD 2004 05 01 02 30 00 3203-99 D co CCGG 200.800 -999.990 ... R5 2004 05 28 11 44 00 44.4500 75.5700 412.00 407.00 5.00 70269 KZD 2004 05 01 02 30 00 3204-99 D co CCGG 201.550 -999.990 ... R5 2004 05 28 11 57 00 44.4500 75.5700 412.00 407.00 5.00 70270 KZD 2004 05 08 02 30 00 3201-99 D co CCGG 159.580 -999.990 ... R5 2004 05 28 12 12 00 44.4500 75.5700 412.00 407.00 5.00 70271 KZD 2004 05 08 02 30 00 3202-99 D co CCGG 159.300 -999.990 ... R5 2004 05 28 12 25 00 44.4500 75.5700 412.00 407.00 5.00 70272 KZD 2004 05 16 02 30 00 3367-99 D co CCGG 147.050 -999.990 ... R5 2004 06 14 13 36 00 44.4500 75.5700 412.00 407.00 5.00 70273 KZD 2004 05 16 02 30 00 3368-99 D co CCGG 146.820 -999.990 ... R5 2004 06 14 13 49 00 44.4500 75.5700 412.00 407.00 5.00 70274 KZD 2004 05 24 02 30 00 801-99 D co CCGG 125.330 -999.990 ... R5 2004 06 14 14 02 00 44.4500 75.5700 412.00 407.00 5.00 70275 KZD 2004 05 30 02 25 00 819-99 D co CCGG 134.890 -999.990 ... R5 2004 07 28 09 40 00 44.4500 75.5700 412.00 407.00 5.00 70276 KZD 2004 05 30 02 25 00 820-99 D co CCGG 134.460 -999.990 ... R5 2004 07 28 09 53 00 44.4500 75.5700 412.00 407.00 5.00 70277 KZD 2004 06 06 02 35 00 3357-99 D co CCGG 167.640 -999.990 ... R5 2004 07 28 09 14 00 44.4500 75.5700 412.00 407.00 5.00 70278 KZD 2004 06 06 02 35 00 3358-99 D co CCGG 169.450 -999.990 ... R5 2004 07 28 09 27 00 44.4500 75.5700 412.00 407.00 5.00 70279 KZD 2004 06 13 02 00 00 3005-99 D co CCGG 124.670 -999.990 ... R5 2004 07 27 09 32 00 44.4500 75.5700 412.00 407.00 5.00 70280 KZD 2004 06 13 02 00 00 3006-99 D co CCGG 124.200 -999.990 ... R5 2004 07 27 09 45 00 44.4500 75.5700 412.00 407.00 5.00 70281 KZD 2004 06 20 02 15 00 3001-99 D co CCGG 122.310 -999.990 ... R5 2004 07 27 09 06 00 44.4500 75.5700 412.00 407.00 5.00 70282 KZD 2004 06 20 02 15 00 3002-99 D co CCGG 122.220 -999.990 ... R5 2004 07 27 09 19 00 44.4500 75.5700 412.00 407.00 5.00 70283 KZD 2004 06 26 02 25 00 6407-66 D co CCGG 151.540 -999.990 ... R5 2004 07 30 11 06 00 44.4500 75.5700 412.00 407.00 5.00 70284 KZD 2004 06 26 02 25 00 6408-66 D co CCGG 153.160 -999.990 ... R5 2004 07 30 11 19 00 44.4500 75.5700 412.00 407.00 5.00 70285 KZD 2004 07 04 02 30 00 6621-66 D co CCGG 149.960 -999.990 ... R5 2004 07 30 11 32 00 44.4500 75.5700 412.00 407.00 5.00 70286 KZD 2004 07 04 02 30 00 6622-66 D co CCGG 150.670 -999.990 ... R5 2004 07 30 11 45 00 44.4500 75.5700 412.00 407.00 5.00 70287 KZD 2004 07 10 02 10 00 3149-99 D co CCGG 164.000 -999.990 ... R5 2004 08 12 15 19 00 44.4500 75.5700 412.00 407.00 5.00 70288 KZD 2004 07 10 02 10 00 3150-99 D co CCGG 163.250 -999.990 ... R5 2004 08 12 15 32 00 44.4500 75.5700 412.00 407.00 5.00 70289 KZD 2004 07 17 02 15 00 1809-99 D co CCGG 96.170 -999.990 ... R5 2004 08 12 16 39 00 44.4500 75.5700 412.00 407.00 5.00 70290 KZD 2004 07 17 02 15 00 1810-99 D co CCGG 96.080 -999.990 ... R5 2004 08 12 16 52 00 44.4500 75.5700 412.00 407.00 5.00 70291 KZD 2004 07 24 02 10 00 6577-66 D co CCGG 111.360 -999.990 ... R5 2004 08 23 20 42 00 44.4500 75.5700 412.00 407.00 5.00 70292 KZD 2004 07 24 02 10 00 6578-66 D co CCGG 110.430 -999.990 ... R5 2004 08 23 20 55 00 44.4500 75.5700 412.00 407.00 5.00 70293 KZD 2004 07 31 02 25 00 6111-66 D co CCGG 111.030 -999.990 ... R5 2004 08 23 21 10 00 44.4500 75.5700 412.00 407.00 5.00 70294 KZD 2004 07 31 02 25 00 6112-66 D co CCGG 110.730 -999.990 ... R5 2004 08 23 21 23 00 44.4500 75.5700 412.00 407.00 5.00 70295 KZD 2004 08 08 02 00 00 3171-99 D co CCGG 121.410 -999.990 ... R5 2004 09 16 15 59 00 44.4500 75.5700 412.00 407.00 5.00 188773 KZD 2004 08 08 02 00 00 3172-99 D co CCGG 121.170 -999.990 ... R5 2004 09 16 16 14 00 44.4500 75.5700 412.00 407.00 5.00 188774 KZD 2004 08 14 02 05 00 6607-66 D co CCGG 159.480 -999.990 ... R5 2004 09 16 16 28 00 44.4500 75.5700 412.00 407.00 5.00 188775 KZD 2004 08 14 02 05 00 6608-66 D co CCGG 158.460 -999.990 ... R5 2004 09 16 16 42 00 44.4500 75.5700 412.00 407.00 5.00 188776 KZD 2004 08 21 02 15 00 2231-99 D co CCGG 112.140 -999.990 ... R5 2004 10 05 12 47 00 44.4500 75.5700 412.00 407.00 5.00 189121 KZD 2004 08 21 02 15 00 2232-99 D co CCGG 112.280 -999.990 ... R5 2004 10 05 13 01 00 44.4500 75.5700 412.00 407.00 5.00 189122 KZD 2004 08 28 02 15 00 2465-99 D co CCGG 129.250 -999.990 ... R5 2004 10 05 12 19 00 44.4500 75.5700 412.00 407.00 5.00 189123 KZD 2004 08 28 02 15 00 2466-99 D co CCGG 128.010 -999.990 ... R5 2004 10 05 12 33 00 44.4500 75.5700 412.00 407.00 5.00 189124 KZD 2004 09 04 02 00 00 3321-99 D co CCGG 111.060 -999.990 ... R5 2004 10 04 10 56 00 44.4500 75.5700 412.00 407.00 5.00 189692 KZD 2004 09 04 02 00 00 3322-99 D co CCGG 111.660 -999.990 ... R5 2004 10 04 11 10 00 44.4500 75.5700 412.00 407.00 5.00 189693 KZD 2004 09 11 02 25 00 3591-99 D co CCGG 107.820 -999.990 ... R5 2004 10 04 10 28 00 44.4500 75.5700 412.00 407.00 5.00 189694 KZD 2004 09 11 02 25 00 3592-99 D co CCGG 107.240 -999.990 ... R5 2004 10 04 10 42 00 44.4500 75.5700 412.00 407.00 5.00 189695 KZD 2004 09 18 02 35 00 2413-99 D co CCGG 108.010 -999.990 ... R5 2004 11 01 20 52 00 44.4500 75.5700 412.00 407.00 5.00 190794 KZD 2004 09 18 02 35 00 2414-99 D co CCGG 107.070 -999.990 ... R5 2004 11 01 21 06 00 44.4500 75.5700 412.00 407.00 5.00 190795 KZD 2004 09 25 02 45 00 3783-99 D co CCGG 128.410 -999.990 ... R5 2004 11 02 12 51 00 44.4500 75.5700 412.00 407.00 5.00 190796 KZD 2004 09 25 02 45 00 3784-99 D co CCGG 127.960 -999.990 ... R5 2004 11 02 13 05 00 44.4500 75.5700 412.00 407.00 5.00 190797 KZD 2004 10 02 03 20 00 6501-66 D co CCGG 149.030 -999.990 ... R5 2004 10 29 09 51 00 44.4500 75.5700 412.00 407.00 5.00 190756 KZD 2004 10 02 03 20 00 6502-66 D co CCGG 147.900 -999.990 ... R5 2004 10 29 10 05 00 44.4500 75.5700 412.00 407.00 5.00 190757 KZD 2004 10 08 03 05 00 6023-66 D co CCGG 104.470 -999.990 ... R5 2004 10 29 10 19 00 44.4500 75.5700 412.00 407.00 5.00 190754 KZD 2004 10 08 03 05 00 6024-66 D co CCGG 104.310 -999.990 ... R5 2004 10 29 10 34 00 44.4500 75.5700 412.00 407.00 5.00 190755 KZD 2005 03 03 05 40 00 1269-99 D co CCGG 203.820 -999.990 ... R5 2005 03 31 11 16 00 44.0839 76.8712 600.00 595.00 5.00 197091 KZD 2005 03 03 05 40 00 1270-99 D co CCGG 204.780 -999.990 ... R5 2005 03 31 11 30 00 44.0839 76.8712 600.00 595.00 5.00 197092 KZD 2005 03 12 02 45 00 169-99 D co CCGG 169.570 -999.990 ... R5 2005 03 31 11 44 00 44.0839 76.8712 600.00 595.00 5.00 197093 KZD 2005 03 12 02 45 00 170-99 D co CCGG 168.880 -999.990 ... R5 2005 03 31 11 58 00 44.0839 76.8712 600.00 595.00 5.00 197094 KZD 2005 03 16 06 00 00 3593-99 D co CCGG 195.970 -999.990 ... R5 2005 04 15 10 27 00 44.0839 76.8712 600.00 595.00 5.00 197672 KZD 2005 03 16 06 00 00 3594-99 D co CCGG 194.660 -999.990 ... R5 2005 04 15 10 41 00 44.0839 76.8712 600.00 595.00 5.00 197673 KZD 2005 03 23 07 07 00 3329-99 D co CCGG 258.450 -999.990 P.C R5 2005 04 15 09 30 00 44.0839 76.8712 600.00 595.00 5.00 197670 KZD 2005 03 23 07 07 00 3330-99 D co CCGG 265.990 -999.990 P.C R5 2005 04 15 09 45 00 44.0839 76.8712 600.00 595.00 5.00 197671 KZD 2005 03 30 07 15 00 4055-99 D co CCGG 227.940 -999.990 ... R5 2005 05 03 12 04 00 44.0839 76.8712 600.00 595.00 5.00 198262 KZD 2005 03 30 07 15 00 4056-99 D co CCGG 227.550 -999.990 ... R5 2005 05 03 12 18 00 44.0839 76.8712 600.00 595.00 5.00 198263 KZD 2005 04 06 05 46 00 850-99 D co CCGG 166.870 -999.990 ... R5 2005 05 03 12 46 00 44.0839 76.8712 600.00 595.00 5.00 198261 KZD 2005 04 13 04 25 00 3885-99 D co CCGG 169.210 -999.990 ... R5 2005 05 10 09 47 00 44.0839 76.8712 600.00 595.00 5.00 198463 KZD 2005 04 13 04 25 00 3886-99 D co CCGG 170.050 -999.990 ... R5 2005 05 10 10 01 00 44.0839 76.8712 600.00 595.00 5.00 198464 KZD 2005 04 20 04 10 00 2911-99 D co CCGG 149.950 -999.990 ... R5 2005 05 10 09 19 00 44.0839 76.8712 600.00 595.00 5.00 198461 KZD 2005 04 20 04 10 00 2912-99 D co CCGG 150.460 -999.990 ... R5 2005 05 10 09 33 00 44.0839 76.8712 600.00 595.00 5.00 198462 KZD 2005 04 30 07 30 00 2657-99 D co CCGG 175.210 -999.990 ... R5 2005 06 06 11 11 00 44.0839 76.8712 600.00 595.00 5.00 199367 KZD 2005 04 30 07 30 00 2658-99 D co CCGG 175.900 -999.990 ... R5 2005 06 06 11 25 00 44.0839 76.8712 600.00 595.00 5.00 199368 KZD 2005 05 07 06 30 00 1853-99 D co CCGG 151.930 -999.990 P.. R5 2005 06 06 10 42 00 44.0839 76.8712 600.00 595.00 5.00 199369 KZD 2005 05 07 06 30 00 1854-99 D co CCGG 141.060 -999.990 P.. R5 2005 06 06 10 56 00 44.0839 76.8712 600.00 595.00 5.00 199370 KZD 2005 05 14 08 15 00 589-99 D co CCGG 166.280 -999.990 ... R5 2005 06 22 12 35 00 44.0839 76.8712 600.00 595.00 5.00 200355 KZD 2005 05 14 08 15 00 590-99 D co CCGG 165.110 -999.990 ... R5 2005 06 22 12 50 00 44.0839 76.8712 600.00 595.00 5.00 200356 KZD 2005 05 21 08 08 00 6197-66 D co CCGG 146.820 -999.990 ... R5 2005 06 22 13 04 00 44.0839 76.8712 600.00 595.00 5.00 200353 KZD 2005 05 21 08 08 00 6198-66 D co CCGG 146.830 -999.990 ... R5 2005 06 22 13 18 00 44.0839 76.8712 600.00 595.00 5.00 200354 KZD 2005 05 28 08 20 00 3881-99 D co CCGG 146.640 -999.990 ... R5 2005 07 18 11 12 00 44.0839 76.8712 600.00 595.00 5.00 201638 KZD 2005 05 28 08 20 00 3882-99 D co CCGG 146.150 -999.990 ... R5 2005 07 18 11 26 00 44.0839 76.8712 600.00 595.00 5.00 201639 KZD 2005 06 04 07 10 00 647-99 D co CCGG 156.580 -999.990 ... R5 2005 07 18 11 41 00 44.0839 76.8712 600.00 595.00 5.00 201640 KZD 2005 06 04 07 10 00 648-99 D co CCGG 156.820 -999.990 ... R5 2005 07 18 11 55 00 44.0839 76.8712 600.00 595.00 5.00 201641 KZD 2005 06 10 08 30 00 511-99 D co CCGG 142.800 -999.990 ... R5 2005 08 08 11 30 00 44.0839 76.8712 600.00 595.00 5.00 202775 KZD 2005 06 10 08 30 00 512-99 D co CCGG 142.970 -999.990 ... R5 2005 08 08 11 44 00 44.0839 76.8712 600.00 595.00 5.00 202776 KZD 2005 06 18 07 00 00 3751-99 D co CCGG 162.530 -999.990 ... R5 2005 08 08 11 58 00 44.0839 76.8712 600.00 595.00 5.00 202773 KZD 2005 06 18 07 00 00 3752-99 D co CCGG 162.560 -999.990 ... R5 2005 08 08 12 12 00 44.0839 76.8712 600.00 595.00 5.00 202774 KZD 2005 06 24 08 20 00 1057-99 D co CCGG 245.680 -999.990 .NC R5 2005 08 11 14 26 00 44.0839 76.8712 600.00 595.00 5.00 203003 KZD 2005 06 24 08 20 00 1058-99 D co CCGG 253.300 -999.990 .NC R5 2005 08 11 14 41 00 44.0839 76.8712 600.00 595.00 5.00 203004 KZD 2005 07 02 06 25 00 3987-99 D co CCGG 125.280 -999.990 ... R5 2005 08 11 14 55 00 44.0839 76.8712 600.00 595.00 5.00 203001 KZD 2005 07 02 06 25 00 3988-99 D co CCGG 125.760 -999.990 ... R5 2005 08 11 15 09 00 44.0839 76.8712 600.00 595.00 5.00 203002 KZD 2005 07 09 06 35 00 3815-99 D co CCGG 161.350 -999.990 ... R5 2005 08 17 09 29 00 44.0839 76.8712 600.00 595.00 5.00 203349 KZD 2005 07 09 06 35 00 3816-99 D co CCGG 160.130 -999.990 ... R5 2005 08 17 09 43 00 44.0839 76.8712 600.00 595.00 5.00 203350 KZD 2005 07 16 06 35 00 705-99 D co CCGG 108.050 -999.990 ... R5 2005 08 17 09 01 00 44.0839 76.8712 600.00 595.00 5.00 203351 KZD 2005 07 16 06 35 00 706-99 D co CCGG 108.240 -999.990 ... R5 2005 08 17 09 15 00 44.0839 76.8712 600.00 595.00 5.00 203352 KZD 2005 07 23 06 45 00 833-99 D co CCGG 131.840 -999.990 ... R5 2005 08 26 14 04 00 44.0839 76.8712 600.00 595.00 5.00 204113 KZD 2005 07 23 06 45 00 834-99 D co CCGG 131.540 -999.990 ... R5 2005 08 26 14 18 00 44.0839 76.8712 600.00 595.00 5.00 204114 KZD 2005 07 30 06 05 00 829-99 D co CCGG 170.610 -999.990 ... R5 2005 08 26 14 32 00 44.0839 76.8712 600.00 595.00 5.00 204111 KZD 2005 07 30 06 05 00 830-99 D co CCGG 170.930 -999.990 ... R5 2005 08 26 14 46 00 44.0839 76.8712 600.00 595.00 5.00 204112 KZD 2005 08 06 06 40 00 2704-99 D co CCGG 122.670 -999.990 ... R5 2005 08 31 10 53 00 44.0839 76.8712 600.00 595.00 5.00 204489 KZD 2005 08 06 06 40 00 788-99 D co CCGG 122.320 -999.990 ... R5 2005 08 31 10 39 00 44.0839 76.8712 600.00 595.00 5.00 204490 KZD 2005 08 13 06 35 00 3251-99 D co CCGG 105.720 -999.990 ... R5 2005 10 03 12 12 00 44.0839 76.8712 600.00 595.00 5.00 205815 KZD 2005 08 13 06 35 00 3252-99 D co CCGG 105.520 -999.990 ... R5 2005 10 03 12 27 00 44.0839 76.8712 600.00 595.00 5.00 205816 KZD 2005 08 20 06 10 00 195-99 D co CCGG 126.840 -999.990 ... R5 2005 10 03 12 41 00 44.0839 76.8712 600.00 595.00 5.00 205813 KZD 2005 08 20 06 10 00 196-99 D co CCGG 126.340 -999.990 ... R5 2005 10 03 12 55 00 44.0839 76.8712 600.00 595.00 5.00 205814 KZD 2005 08 27 05 50 00 947-99 D co CCGG 110.460 -999.990 ... R5 2005 10 11 15 53 00 44.0839 76.8712 600.00 595.00 5.00 206434 KZD 2005 08 27 05 50 00 948-99 D co CCGG 110.620 -999.990 ... R5 2005 10 11 16 08 00 44.0839 76.8712 600.00 595.00 5.00 206435 KZD 2005 09 10 05 30 00 3979-99 P co CCGG 139.320 -999.990 ... R5 2005 10 18 10 20 00 44.0839 76.8712 600.00 595.00 5.00 206830 KZD 2005 09 10 05 30 00 3980-99 P co CCGG 138.590 -999.990 ... R5 2005 10 18 10 34 00 44.0839 76.8712 600.00 595.00 5.00 206831 KZD 2005 09 17 05 55 00 443-99 P co CCGG 131.490 -999.990 ... R5 2005 10 18 09 51 00 44.0839 76.8712 600.00 595.00 5.00 206828 KZD 2005 09 17 05 55 00 444-99 P co CCGG 133.130 -999.990 ... R5 2005 10 18 10 06 00 44.0839 76.8712 600.00 595.00 5.00 206829 KZD 2005 09 23 08 45 00 2131-99 P co CCGG 128.090 -999.990 ... R5 2005 11 04 14 25 00 44.0839 76.8712 600.00 595.00 5.00 207825 KZD 2005 09 23 08 45 00 2132-99 P co CCGG 126.740 -999.990 ... R5 2005 11 04 14 39 00 44.0839 76.8712 600.00 595.00 5.00 207826 KZD 2005 10 03 11 40 00 1462-99 P co CCGG 124.900 -999.990 ... R5 2005 11 10 16 27 00 44.0839 76.8712 600.00 595.00 5.00 207824 KZD 2005 10 09 09 15 00 2413-99 P co CCGG 138.760 -999.990 ... R5 2005 11 21 16 44 00 44.0839 76.8712 600.00 595.00 5.00 209130 KZD 2005 10 09 09 15 00 2414-99 P co CCGG 138.350 -999.990 ... R5 2005 11 21 16 58 00 44.0839 76.8712 600.00 595.00 5.00 209131 KZD 2005 10 15 07 15 00 1917-99 P co CCGG 144.340 -999.990 ... R5 2005 11 21 16 16 00 44.0839 76.8712 600.00 595.00 5.00 209132 KZD 2005 10 15 07 15 00 1918-99 P co CCGG 144.910 -999.990 ... R5 2005 11 21 16 30 00 44.0839 76.8712 600.00 595.00 5.00 209133 KZD 2005 10 22 06 30 00 825-99 P co CCGG 168.600 -999.990 ... R5 2005 12 02 13 10 00 44.0839 76.8712 600.00 595.00 5.00 209353 KZD 2005 10 22 06 30 00 826-99 P co CCGG 167.930 -999.990 ... R5 2005 12 02 13 25 00 44.0839 76.8712 600.00 595.00 5.00 209354 KZD 2005 10 29 06 40 00 3693-99 P co CCGG 215.320 -999.990 .X. R5 2005 12 02 13 39 00 44.0839 76.8712 600.00 595.00 5.00 209351 KZD 2005 10 29 06 40 00 3694-99 P co CCGG 214.670 -999.990 .X. R5 2005 12 02 13 53 00 44.0839 76.8712 600.00 595.00 5.00 209352 KZD 2005 11 05 07 50 00 23-99 P co CCGG 145.050 -999.990 ... R5 2005 12 05 14 32 00 44.0839 76.8712 600.00 595.00 5.00 209605 KZD 2005 11 05 07 50 00 24-99 P co CCGG 145.090 -999.990 ... R5 2005 12 05 14 46 00 44.0839 76.8712 600.00 595.00 5.00 209606 KZD 2005 11 12 06 50 00 3703-99 P co CCGG 127.200 -999.990 ... R5 2005 12 05 14 03 00 44.0839 76.8712 600.00 595.00 5.00 209603 KZD 2005 11 12 06 50 00 3704-99 P co CCGG 127.110 -999.990 ... R5 2005 12 05 14 18 00 44.0839 76.8712 600.00 595.00 5.00 209604 KZD 2005 11 19 06 25 00 3089-99 G co CCGG 261.340 -999.990 .XC R5 2005 12 20 10 20 00 44.0839 76.8712 600.00 595.00 5.00 210354 KZD 2005 11 19 06 25 00 3090-99 G co CCGG 261.890 -999.990 .XC R5 2005 12 20 10 34 00 44.0839 76.8712 600.00 595.00 5.00 210355 KZD 2005 11 26 06 17 00 1779-99 G co CCGG 154.010 -999.990 ... R5 2005 12 20 11 17 00 44.0839 76.8712 600.00 595.00 5.00 210352 KZD 2005 11 26 06 17 00 1780-99 G co CCGG 153.710 -999.990 ... R5 2005 12 20 11 32 00 44.0839 76.8712 600.00 595.00 5.00 210353 KZD 2005 12 03 07 10 00 3509-99 G co CCGG 436.900 -999.990 .NC R5 2006 03 21 15 40 00 44.0839 76.8712 600.00 595.00 5.00 214126 KZD 2005 12 03 07 10 00 3510-99 G co CCGG 438.310 -999.990 .NC R5 2006 03 21 15 54 00 44.0839 76.8712 600.00 595.00 5.00 214127 KZD 2005 12 10 06 16 00 3281-99 G co CCGG 177.720 -999.990 ... R5 2006 03 21 15 12 00 44.0839 76.8712 600.00 595.00 5.00 214128 KZD 2005 12 10 06 16 00 3282-99 G co CCGG 177.820 -999.990 ... R5 2006 03 21 15 26 00 44.0839 76.8712 600.00 595.00 5.00 214129 KZD 2005 12 17 05 39 00 3653-99 G co CCGG 423.800 -999.990 .NC R5 2006 01 30 14 57 00 44.0839 76.8712 600.00 595.00 5.00 211814 KZD 2005 12 17 05 39 00 3654-99 G co CCGG 424.650 -999.990 .NC R5 2006 01 30 15 12 00 44.0839 76.8712 600.00 595.00 5.00 211815 KZD 2005 12 24 03 45 00 6187-66 G co CCGG 372.350 -999.990 .NC R5 2006 01 30 14 43 00 44.0839 76.8712 600.00 595.00 5.00 211813 KZD 2005 12 31 07 53 00 813-99 G co CCGG 196.530 -999.990 ... R5 2006 03 24 14 37 00 44.0839 76.8712 600.00 595.00 5.00 214282 KZD 2005 12 31 07 53 00 814-99 G co CCGG 196.370 -999.990 ... R5 2006 03 24 14 51 00 44.0839 76.8712 600.00 595.00 5.00 214283 KZD 2006 01 07 07 45 00 129-99 G co CCGG 569.250 -999.990 .NC R5 2006 03 24 14 08 00 44.0839 76.8712 600.00 595.00 5.00 214280 KZD 2006 01 07 07 45 00 130-99 G co CCGG 569.110 -999.990 .NC R5 2006 03 24 14 22 00 44.0839 76.8712 600.00 595.00 5.00 214281 KZD 2006 01 14 06 58 00 4143-99 G co CCGG 593.590 -999.990 .NC R5 2006 02 23 09 23 00 44.0839 76.8712 600.00 595.00 5.00 212830 KZD 2006 01 14 06 58 00 4144-99 G co CCGG 591.370 -999.990 .NC R5 2006 02 23 09 37 00 44.0839 76.8712 600.00 595.00 5.00 212831 KZD 2006 01 21 08 20 00 6333-66 G co CCGG 364.210 -999.990 .NC R5 2006 02 23 09 52 00 44.0839 76.8712 600.00 595.00 5.00 212828 KZD 2006 01 21 08 20 00 6334-66 G co CCGG 364.880 -999.990 .NC R5 2006 02 23 10 06 00 44.0839 76.8712 600.00 595.00 5.00 212829 KZD 2006 01 28 08 24 00 2249-99 G co CCGG 217.050 -999.990 ... R5 2006 03 22 12 14 00 44.0839 76.8712 600.00 595.00 5.00 214120 KZD 2006 01 28 08 24 00 2250-99 G co CCGG 217.790 -999.990 ... R5 2006 03 22 12 28 00 44.0839 76.8712 600.00 595.00 5.00 214121 KZD 2006 02 04 07 10 00 3127-99 G co CCGG 345.170 -999.990 .XC R5 2006 03 22 11 46 00 44.0839 76.8712 600.00 595.00 5.00 214118 KZD 2006 02 04 07 10 00 3128-99 G co CCGG 346.890 -999.990 .XC R5 2006 03 22 12 00 00 44.0839 76.8712 600.00 595.00 5.00 214119 KZD 2006 02 11 05 33 00 2169-99 G co CCGG 238.950 -999.990 ..C R5 2006 03 13 13 58 00 44.0839 76.8712 600.00 595.00 5.00 213820 KZD 2006 02 11 05 33 00 2170-99 G co CCGG 238.260 -999.990 ..C R5 2006 03 13 14 12 00 44.0839 76.8712 600.00 595.00 5.00 213821 KZD 2006 02 19 07 45 00 2841-99 G co CCGG 186.160 -999.990 ... R5 2006 03 13 13 29 00 44.0839 76.8712 600.00 595.00 5.00 213818 KZD 2006 02 19 07 45 00 2842-99 G co CCGG 186.470 -999.990 ... R5 2006 03 13 13 43 00 44.0839 76.8712 600.00 595.00 5.00 213819 KZD 2006 02 25 07 12 00 1401-99 G co CCGG 189.760 -999.990 ... R5 2006 04 26 13 05 00 44.0839 76.8712 600.00 595.00 5.00 215892 KZD 2006 02 25 07 12 00 1402-99 G co CCGG 189.760 -999.990 ... R5 2006 04 26 13 20 00 44.0839 76.8712 600.00 595.00 5.00 215893 KZD 2006 03 04 07 29 00 6291-66 G co CCGG 172.830 -999.990 P.. R5 2006 04 26 12 37 00 44.0839 76.8712 600.00 595.00 5.00 215890 KZD 2006 03 04 07 29 00 6292-66 G co CCGG 168.290 -999.990 P.. R5 2006 04 26 12 51 00 44.0839 76.8712 600.00 595.00 5.00 215891 KZD 2006 03 11 05 15 00 4203-99 G co CCGG 209.700 -999.990 ... R5 2006 04 11 10 26 00 44.0839 76.8712 600.00 595.00 5.00 215132 KZD 2006 03 11 05 15 00 4204-99 G co CCGG 211.180 -999.990 ... R5 2006 04 11 10 40 00 44.0839 76.8712 600.00 595.00 5.00 215133 KZD 2006 03 18 06 41 00 3119-99 G co CCGG 169.410 -999.990 ... R5 2006 04 11 10 54 00 44.0839 76.8712 600.00 595.00 5.00 215130 KZD 2006 03 18 06 41 00 3120-99 G co CCGG 170.140 -999.990 ... R5 2006 04 11 11 08 00 44.0839 76.8712 600.00 595.00 5.00 215131 KZD 2006 03 26 07 07 00 83-99 G co CCGG 213.600 -999.990 ... R5 2006 05 01 15 27 00 44.0839 76.8712 600.00 595.00 5.00 215876 KZD 2006 03 26 07 07 00 84-99 G co CCGG 214.970 -999.990 ... R5 2006 05 01 15 41 00 44.0839 76.8712 600.00 595.00 5.00 215877 KZD 2006 04 01 07 15 00 3135-99 G co CCGG 145.260 -999.990 ... R5 2006 05 02 09 17 00 44.0839 76.8712 600.00 595.00 5.00 215874 KZD 2006 04 01 07 15 00 3136-99 G co CCGG 144.730 -999.990 ... R5 2006 05 02 09 32 00 44.0839 76.8712 600.00 595.00 5.00 215875 KZD 2006 04 08 05 41 00 6015-66 G co CCGG 184.820 -999.990 ... R5 2006 05 12 11 19 00 44.0839 76.8712 600.00 595.00 5.00 216375 KZD 2006 04 08 05 41 00 6016-66 G co CCGG 184.230 -999.990 ... R5 2006 05 12 11 33 00 44.0839 76.8712 600.00 595.00 5.00 216376 KZD 2006 04 15 06 18 00 563-99 G co CCGG 152.730 -999.990 ... R5 2006 05 12 11 47 00 44.0839 76.8712 600.00 595.00 5.00 216373 KZD 2006 04 15 06 18 00 564-99 G co CCGG 153.860 -999.990 ... R5 2006 05 12 12 02 00 44.0839 76.8712 600.00 595.00 5.00 216374 KZD 2006 04 22 07 37 00 557-99 G co CCGG 141.840 -999.990 ... R5 2006 05 26 11 53 00 44.0839 76.8712 600.00 595.00 5.00 217089 KZD 2006 04 22 07 37 00 558-99 G co CCGG 142.280 -999.990 ... R5 2006 05 26 12 07 00 44.0839 76.8712 600.00 595.00 5.00 217090 KZD 2006 04 29 06 35 00 3443-99 G co CCGG 120.470 -999.990 ... R5 2006 05 26 11 24 00 44.0839 76.8712 600.00 595.00 5.00 217091 KZD 2006 04 29 06 35 00 3444-99 G co CCGG 119.710 -999.990 ... R5 2006 05 26 11 38 00 44.0839 76.8712 600.00 595.00 5.00 217092 KZD 2006 05 06 08 48 00 2419-99 G co CCGG 149.890 -999.990 ... R5 2006 06 15 09 23 00 44.0839 76.8712 600.00 595.00 5.00 217877 KZD 2006 05 06 08 48 00 2420-99 G co CCGG 150.470 -999.990 ... R5 2006 06 15 09 38 00 44.0839 76.8712 600.00 595.00 5.00 217878 KZD 2006 05 13 07 19 00 1937-99 G co CCGG 148.050 -999.990 ... R5 2006 06 14 15 03 00 44.0839 76.8712 600.00 595.00 5.00 217875 KZD 2006 05 13 07 19 00 1938-99 G co CCGG 148.240 -999.990 ... R5 2006 06 14 15 17 00 44.0839 76.8712 600.00 595.00 5.00 217876 KZD 2006 05 20 06 41 00 2033-99 G co CCGG 174.600 -999.990 ... R5 2006 06 28 16 16 00 44.0839 76.8712 600.00 595.00 5.00 218260 KZD 2006 05 20 06 41 00 2034-99 G co CCGG 174.830 -999.990 ... R5 2006 06 28 16 30 00 44.0839 76.8712 600.00 595.00 5.00 218261 KZD 2006 05 30 08 50 00 2513-99 G co CCGG 121.440 -999.990 ... R5 2006 06 28 16 44 00 44.0839 76.8712 600.00 595.00 5.00 218258 KZD 2006 05 30 08 50 00 2514-99 G co CCGG 121.720 -999.990 ... R5 2006 06 28 16 59 00 44.0839 76.8712 600.00 595.00 5.00 218259 KZD 2006 06 03 05 44 00 1523-99 G co CCGG 126.200 -999.990 ... R5 2006 07 17 12 41 00 44.0839 76.8712 600.00 595.00 5.00 218986 KZD 2006 06 03 05 44 00 1524-99 G co CCGG 125.630 -999.990 ... R5 2006 07 17 12 56 00 44.0839 76.8712 600.00 595.00 5.00 218987 KZD 2006 06 10 07 01 00 2371-99 G co CCGG 143.850 -999.990 ... R5 2006 07 17 12 13 00 44.0839 76.8712 600.00 595.00 5.00 218984 KZD 2006 06 10 07 01 00 2372-99 G co CCGG 143.750 -999.990 ... R5 2006 07 17 12 27 00 44.0839 76.8712 600.00 595.00 5.00 218985 KZD 2006 06 17 06 40 00 1527-99 G co CCGG 126.100 -999.990 ... R5 2006 08 14 10 15 00 44.0839 76.8712 600.00 595.00 5.00 220326 KZD 2006 06 17 06 40 00 1528-99 G co CCGG 126.620 -999.990 ... R5 2006 08 14 10 29 00 44.0839 76.8712 600.00 595.00 5.00 220327 KZD 2006 06 24 06 25 00 2261-99 G co CCGG 133.990 -999.990 ... R5 2006 08 14 09 46 00 44.0839 76.8712 600.00 595.00 5.00 220324 KZD 2006 06 24 06 25 00 2262-99 G co CCGG 133.850 -999.990 ... R5 2006 08 14 10 01 00 44.0839 76.8712 600.00 595.00 5.00 220325 KZD 2006 07 01 05 32 00 4185-99 G co CCGG 131.170 -999.990 ... R5 2006 08 31 14 52 00 44.0839 76.8712 600.00 595.00 5.00 221357 KZD 2006 07 01 05 32 00 4186-99 G co CCGG 129.790 -999.990 ... R5 2006 08 31 15 06 00 44.0839 76.8712 600.00 595.00 5.00 221358 KZD 2006 07 08 06 57 00 2856-99 G co CCGG 109.790 -999.990 ... R5 2006 08 23 12 12 00 44.0839 76.8712 600.00 595.00 5.00 220829 KZD 2006 07 15 05 30 00 4497-99 G co CCGG 138.020 -999.990 ... R5 2006 08 23 12 27 00 44.0839 76.8712 600.00 595.00 5.00 220827 KZD 2006 07 15 05 30 00 4498-99 G co CCGG 137.850 -999.990 ... R5 2006 08 23 12 41 00 44.0839 76.8712 600.00 595.00 5.00 220828 KZD 2006 07 22 05 03 00 4065-99 G co CCGG 195.760 -999.990 ... R5 2006 08 31 15 20 00 44.0839 76.8712 600.00 595.00 5.00 221343 KZD 2006 07 22 05 03 00 4066-99 G co CCGG 194.550 -999.990 ... R5 2006 08 31 15 34 00 44.0839 76.8712 600.00 595.00 5.00 221344 KZD 2006 07 30 05 50 00 4047-99 G co CCGG 183.760 -999.990 ... R5 2006 09 01 13 45 00 44.0839 76.8712 600.00 595.00 5.00 221567 KZD 2006 07 30 05 50 00 4048-99 G co CCGG 186.400 -999.990 ... R5 2006 09 01 13 59 00 44.0839 76.8712 600.00 595.00 5.00 221568 KZD 2006 08 05 06 03 00 2455-99 G co CCGG 165.010 -999.990 ... R5 2006 09 01 13 17 00 44.0839 76.8712 600.00 595.00 5.00 221565 KZD 2006 08 05 06 03 00 2456-99 G co CCGG 166.080 -999.990 ... R5 2006 09 01 13 31 00 44.0839 76.8712 600.00 595.00 5.00 221566 KZD 2006 08 12 06 11 00 1965-99 G co CCGG 127.060 -999.990 ... R5 2006 09 29 13 42 00 44.0839 76.8712 600.00 595.00 5.00 222600 KZD 2006 08 12 06 11 00 1966-99 G co CCGG 128.030 -999.990 ... R5 2006 09 29 13 56 00 44.0839 76.8712 600.00 595.00 5.00 222601 KZD 2006 08 19 06 05 00 6217-66 G co CCGG 141.650 -999.990 ... R5 2006 09 29 13 14 00 44.0839 76.8712 600.00 595.00 5.00 222598 KZD 2006 08 19 06 05 00 6218-66 G co CCGG 141.160 -999.990 ... R5 2006 09 29 13 28 00 44.0839 76.8712 600.00 595.00 5.00 222599 KZD 2006 08 26 05 25 00 6051-66 G co CCGG 125.040 -999.990 ... R5 2006 09 29 14 39 00 44.0839 76.8712 600.00 595.00 5.00 222604 KZD 2006 08 26 05 25 00 6052-66 G co CCGG 125.290 -999.990 ... R5 2006 09 29 14 53 00 44.0839 76.8712 600.00 595.00 5.00 222605 KZD 2006 09 02 06 05 00 2749-99 G co CCGG 117.570 -999.990 ... R5 2006 09 29 14 11 00 44.0839 76.8712 600.00 595.00 5.00 222602 KZD 2006 09 02 06 05 00 2750-99 G co CCGG 118.230 -999.990 ... R5 2006 09 29 14 25 00 44.0839 76.8712 600.00 595.00 5.00 222603 KZD 2006 09 09 06 20 00 2681-99 G co CCGG 182.880 -999.990 ... R5 2006 10 17 09 18 00 44.0839 76.8712 600.00 595.00 5.00 223430 KZD 2006 09 09 06 20 00 2682-99 G co CCGG 184.740 -999.990 ... R5 2006 10 17 09 33 00 44.0839 76.8712 600.00 595.00 5.00 223431 KZD 2006 09 16 06 33 00 1645-99 G co CCGG 109.590 -999.990 ... R5 2006 10 17 08 50 00 44.0839 76.8712 600.00 595.00 5.00 223428 KZD 2006 09 16 06 33 00 1646-99 G co CCGG 109.500 -999.990 ... R5 2006 10 17 09 04 00 44.0839 76.8712 600.00 595.00 5.00 223429 KZD 2006 09 23 06 14 00 1889-99 G co CCGG 132.250 -999.990 ... R5 2006 11 02 14 05 00 44.0839 76.8712 600.00 595.00 5.00 224220 KZD 2006 09 23 06 14 00 1890-99 G co CCGG 131.180 -999.990 ... R5 2006 11 02 14 19 00 44.0839 76.8712 600.00 595.00 5.00 224221 KZD 2006 09 30 06 46 00 823-99 G co CCGG 145.900 -999.990 ... R5 2006 11 02 13 36 00 44.0839 76.8712 600.00 595.00 5.00 224218 KZD 2006 09 30 06 46 00 824-99 G co CCGG 148.750 -999.990 ... R5 2006 11 02 13 50 00 44.0839 76.8712 600.00 595.00 5.00 224219 KZD 2006 10 07 06 37 00 6379-66 G co CCGG 140.220 -999.990 ... R5 2006 11 13 11 42 00 44.0839 76.8712 600.00 595.00 5.00 224796 KZD 2006 10 07 06 37 00 6380-66 G co CCGG 139.430 -999.990 ... R5 2006 11 13 11 57 00 44.0839 76.8712 600.00 595.00 5.00 224797 KZD 2006 10 14 07 05 00 587-99 G co CCGG 117.930 -999.990 ... R5 2006 11 13 12 11 00 44.0839 76.8712 600.00 595.00 5.00 224794 KZD 2006 10 14 07 05 00 588-99 G co CCGG 117.940 -999.990 ... R5 2006 11 13 12 25 00 44.0839 76.8712 600.00 595.00 5.00 224795 KZD 2006 10 21 06 05 00 1015-99 G co CCGG 118.170 -999.990 ... R5 2006 11 20 12 54 00 44.0839 76.8712 600.00 595.00 5.00 225227 KZD 2006 10 21 06 05 00 1016-99 G co CCGG 117.640 -999.990 ... R5 2006 11 20 13 08 00 44.0839 76.8712 600.00 595.00 5.00 225228 KZD 2006 10 28 06 46 00 931-99 G co CCGG 241.270 -999.990 .XC R5 2006 11 20 13 22 00 44.0839 76.8712 600.00 595.00 5.00 225225 KZD 2006 10 28 06 46 00 932-99 G co CCGG 241.540 -999.990 .XC R5 2006 11 20 13 36 00 44.0839 76.8712 600.00 595.00 5.00 225226 KZD 2006 11 04 05 43 00 3791-99 G co CCGG 301.020 -999.990 .XC R5 2006 12 06 07 57 00 44.0839 76.8712 600.00 595.00 5.00 225669 KZD 2006 11 04 05 43 00 3792-99 G co CCGG 297.830 -999.990 .XC R5 2006 12 06 08 11 00 44.0839 76.8712 600.00 595.00 5.00 225670 KZD 2006 11 12 06 31 00 2163-99 G co CCGG 154.860 -999.990 ... R5 2006 12 06 08 25 00 44.0839 76.8712 600.00 595.00 5.00 225667 KZD 2006 11 12 06 31 00 2164-99 G co CCGG 155.230 -999.990 ... R5 2006 12 06 08 39 00 44.0839 76.8712 600.00 595.00 5.00 225668 KZD 2006 11 19 06 10 00 2771-99 G co CCGG 168.120 -999.990 ... R5 2006 12 26 11 38 00 44.0839 76.8712 600.00 595.00 5.00 226369 KZD 2006 11 19 06 10 00 2772-99 G co CCGG 161.510 -999.990 ... R5 2006 12 26 11 52 00 44.0839 76.8712 600.00 595.00 5.00 226370 KZD 2006 11 25 05 21 00 2347-99 P co CCGG 162.550 -999.990 ... R5 2006 12 26 11 09 00 44.0839 76.8712 600.00 595.00 5.00 226367 KZD 2006 11 25 05 21 00 2348-99 P co CCGG 161.670 -999.990 ... R5 2006 12 26 11 23 00 44.0839 76.8712 600.00 595.00 5.00 226368 KZD 2006 12 02 05 00 00 4395-99 P co CCGG 132.680 -999.990 ... R5 2007 01 31 16 08 00 44.0839 76.8712 600.00 595.00 5.00 227818 KZD 2006 12 02 05 00 00 4396-99 P co CCGG 132.960 -999.990 ... R5 2007 01 31 16 23 00 44.0839 76.8712 600.00 595.00 5.00 227819 KZD 2006 12 09 05 00 00 2371-99 P co CCGG 534.290 -999.990 .NC R5 2007 01 31 15 40 00 44.0839 76.8712 600.00 595.00 5.00 227816 KZD 2006 12 09 05 00 00 2372-99 P co CCGG 532.380 -999.990 .NC R5 2007 01 31 15 54 00 44.0839 76.8712 600.00 595.00 5.00 227817 KZD 2006 12 16 04 45 00 4263-99 P co CCGG 391.300 -999.990 .XC R5 2007 02 01 10 43 00 44.0839 76.8712 600.00 595.00 5.00 227871 KZD 2006 12 16 04 45 00 4264-99 P co CCGG 387.440 -999.990 .XC R5 2007 02 01 10 57 00 44.0839 76.8712 600.00 595.00 5.00 227872 KZD 2006 12 23 06 25 00 2591-99 P co CCGG 144.190 -999.990 ... R5 2007 02 01 10 14 00 44.0839 76.8712 600.00 595.00 5.00 227869 KZD 2006 12 23 06 25 00 2592-99 P co CCGG 144.440 -999.990 ... R5 2007 02 01 10 28 00 44.0839 76.8712 600.00 595.00 5.00 227870 KZD 2006 12 30 04 45 00 6565-66 P co CCGG 210.660 -999.990 ... R5 2007 02 02 14 53 00 44.0839 76.8712 600.00 595.00 5.00 228690 KZD 2006 12 30 04 45 00 6566-66 P co CCGG 210.720 -999.990 ... R5 2007 02 02 15 07 00 44.0839 76.8712 600.00 595.00 5.00 228691 KZD 2007 01 06 05 30 00 3651-99 P co CCGG 296.040 -999.990 .XC R5 2007 02 02 15 21 00 44.0839 76.8712 600.00 595.00 5.00 228692 KZD 2007 01 06 05 30 00 3652-99 P co CCGG 298.580 -999.990 .XC R5 2007 02 02 15 36 00 44.0839 76.8712 600.00 595.00 5.00 228693 KZD 2007 01 14 04 30 00 1811-99 P co CCGG 514.570 -999.990 .XC R5 2007 03 13 09 34 00 44.0839 76.8712 600.00 595.00 5.00 230329 KZD 2007 01 14 04 30 00 1812-99 P co CCGG 512.680 -999.990 .XC R5 2007 03 13 09 48 00 44.0839 76.8712 600.00 595.00 5.00 230330 KZD 2007 01 20 05 15 00 4215-99 P co CCGG 390.250 -999.990 .XC R5 2007 03 13 09 05 00 44.0839 76.8712 600.00 595.00 5.00 230327 KZD 2007 01 20 05 15 00 4216-99 P co CCGG 393.640 -999.990 .XC R5 2007 03 13 09 19 00 44.0839 76.8712 600.00 595.00 5.00 230328 KZD 2007 01 27 04 50 00 6139-66 P co CCGG 380.320 -999.990 .XC R5 2007 03 13 10 02 00 44.0839 76.8712 600.00 595.00 5.00 230325 KZD 2007 01 27 04 50 00 6140-66 P co CCGG 373.220 -999.990 .XC R5 2007 03 13 10 16 00 44.0839 76.8712 600.00 595.00 5.00 230326 KZD 2007 02 03 06 29 00 1453-99 P co CCGG 183.410 -999.990 ... R5 2007 03 15 09 50 00 44.0839 76.8712 600.00 595.00 5.00 230473 KZD 2007 02 03 06 29 00 1454-99 P co CCGG 184.010 -999.990 ... R5 2007 03 15 10 04 00 44.0839 76.8712 600.00 595.00 5.00 230474 KZD 2007 02 10 05 12 00 1305-99 P co CCGG 263.660 -999.990 ..C R5 2007 03 15 09 21 00 44.0839 76.8712 600.00 595.00 5.00 230471 KZD 2007 02 10 05 12 00 1306-99 P co CCGG 264.760 -999.990 ..C R5 2007 03 15 09 36 00 44.0839 76.8712 600.00 595.00 5.00 230472 KZD 2007 02 17 05 20 00 1765-99 P co CCGG 410.130 -999.990 .XC R5 2007 03 27 11 09 00 44.0839 76.8712 600.00 595.00 5.00 231181 KZD 2007 02 17 05 20 00 1766-99 P co CCGG 410.520 -999.990 .XC R5 2007 03 27 11 23 00 44.0839 76.8712 600.00 595.00 5.00 231182 KZD 2007 02 24 05 30 00 1895-99 P co CCGG 180.080 -999.990 ... R5 2007 03 27 11 37 00 44.0839 76.8712 600.00 595.00 5.00 231179 KZD 2007 02 24 05 30 00 1896-99 P co CCGG 180.090 -999.990 ... R5 2007 03 27 11 52 00 44.0839 76.8712 600.00 595.00 5.00 231180 KZD 2007 03 03 05 10 00 1369-99 P co CCGG 209.230 -999.990 ... R5 2007 04 09 11 39 00 44.0839 76.8712 600.00 595.00 5.00 231845 KZD 2007 03 03 05 10 00 1370-99 P co CCGG 209.260 -999.990 ... R5 2007 04 09 11 54 00 44.0839 76.8712 600.00 595.00 5.00 231846 KZD 2007 03 10 05 12 00 1402-99 P co CCGG 226.590 -999.990 ... R5 2007 04 10 08 45 00 44.0839 76.8712 600.00 595.00 5.00 231891 KZD 2007 03 17 05 43 00 993-99 P co CCGG 239.480 -999.990 ..C R5 2007 04 19 15 10 00 44.0839 76.8712 600.00 595.00 5.00 232652 KZD 2007 03 17 05 43 00 994-99 P co CCGG 238.950 -999.990 ..C R5 2007 04 19 15 24 00 44.0839 76.8712 600.00 595.00 5.00 232653 KZD 2007 03 24 05 00 00 3373-99 P co CCGG 225.200 -999.990 ... R5 2007 04 19 14 41 00 44.0839 76.8712 600.00 595.00 5.00 232650 KZD 2007 03 24 05 00 00 3374-99 P co CCGG 226.580 -999.990 ... R5 2007 04 19 14 56 00 44.0839 76.8712 600.00 595.00 5.00 232651 KZD 2007 03 31 05 10 00 6389-66 P co CCGG 174.230 -999.990 ... R5 2007 05 02 10 51 00 44.0839 76.8712 600.00 595.00 5.00 233507 KZD 2007 03 31 05 10 00 6390-66 P co CCGG 174.350 -999.990 ... R5 2007 05 02 11 05 00 44.0839 76.8712 600.00 595.00 5.00 233508 KZD 2007 04 07 05 00 00 3415-99 P co CCGG 152.900 -999.990 ... R5 2007 05 02 11 20 00 44.0839 76.8712 600.00 595.00 5.00 233505 KZD 2007 04 07 05 00 00 3416-99 P co CCGG 153.310 -999.990 ... R5 2007 05 02 11 34 00 44.0839 76.8712 600.00 595.00 5.00 233506 KZD 2007 04 14 05 38 00 1683-99 P co CCGG 212.340 -999.990 P.. R5 2007 05 14 13 43 00 44.0839 76.8712 600.00 595.00 5.00 233888 KZD 2007 04 14 05 38 00 1684-99 P co CCGG 216.040 -999.990 P.. R5 2007 05 14 13 57 00 44.0839 76.8712 600.00 595.00 5.00 233889 KZD 2007 04 21 05 55 00 2631-99 P co CCGG 148.810 -999.990 ... R5 2007 05 14 12 46 00 44.0839 76.8712 600.00 595.00 5.00 233886 KZD 2007 04 21 05 55 00 2632-99 P co CCGG 148.810 -999.990 ... R5 2007 05 14 13 00 00 44.0839 76.8712 600.00 595.00 5.00 233887 KZD 2007 04 28 06 30 00 1347-99 P co CCGG 149.360 -999.990 ... R6 2007 05 29 15 52 00 44.0839 76.8712 600.00 595.00 5.00 234796 KZD 2007 04 28 06 30 00 1348-99 P co CCGG 150.040 -999.990 ... R6 2007 05 29 16 06 00 44.0839 76.8712 600.00 595.00 5.00 234797 KZD 2007 05 05 05 30 00 1496-99 P co CCGG 143.970 -999.990 ... R5 2007 05 29 16 07 00 44.0839 76.8712 600.00 595.00 5.00 234795 KZD 2007 05 12 06 26 00 1953-99 P co CCGG 199.510 -999.990 ... R5 2007 06 15 14 29 00 44.0839 76.8712 600.00 595.00 5.00 235769 KZD 2007 05 12 06 26 00 1954-99 P co CCGG 198.090 -999.990 ... R5 2007 06 15 14 43 00 44.0839 76.8712 600.00 595.00 5.00 235770 KZD 2007 05 20 06 03 00 1976-99 P co CCGG 130.300 -999.990 ... R5 2007 06 15 13 18 00 44.0839 76.8712 600.00 595.00 5.00 235768 KZD 2007 05 26 05 10 00 1569-99 P co CCGG 144.410 -999.990 ... R6 2007 06 29 10 04 00 44.0839 76.8712 600.00 595.00 5.00 237156 KZD 2007 06 02 05 59 00 277-99 P co CCGG 145.640 -999.990 P.. R6 2007 06 29 10 48 00 44.0839 76.8712 600.00 595.00 5.00 237154 KZD 2007 06 02 05 59 00 278-99 P co CCGG 141.600 -999.990 P.. R6 2007 06 29 11 02 00 44.0839 76.8712 600.00 595.00 5.00 237155 KZD 2007 06 10 05 45 00 3537-99 P co CCGG 148.430 -999.990 ... R6 2007 07 05 16 22 00 44.0839 76.8712 600.00 595.00 5.00 237573 KZD 2007 06 10 05 45 00 3538-99 P co CCGG 148.680 -999.990 ... R6 2007 07 05 16 36 00 44.0839 76.8712 600.00 595.00 5.00 237574 KZD 2007 06 16 05 23 00 169-99 P co CCGG 121.780 -999.990 ... R6 2007 07 05 15 53 00 44.0839 76.8712 600.00 595.00 5.00 237575 KZD 2007 06 16 05 23 00 170-99 P co CCGG 119.890 -999.990 ... R6 2007 07 05 16 07 00 44.0839 76.8712 600.00 595.00 5.00 237576 KZD 2007 06 24 05 47 00 1369-99 P co CCGG 140.320 -999.990 ... R6 2007 07 30 11 08 00 44.0839 76.8712 600.00 595.00 5.00 238866 KZD 2007 06 24 05 47 00 1370-99 P co CCGG 141.220 -999.990 ... R6 2007 07 30 11 23 00 44.0839 76.8712 600.00 595.00 5.00 238867 KZD 2007 06 30 05 13 00 1163-99 P co CCGG 141.420 -999.990 ... R6 2007 07 30 11 37 00 44.0839 76.8712 600.00 595.00 5.00 238864 KZD 2007 06 30 05 13 00 1164-99 P co CCGG 140.710 -999.990 ... R6 2007 07 30 11 52 00 44.0839 76.8712 600.00 595.00 5.00 238865 KZD 2007 07 08 05 15 00 3687-99 P co CCGG 126.480 -999.990 ... R5 2007 08 07 12 42 00 44.0839 76.8712 600.00 595.00 5.00 239595 KZD 2007 07 08 05 15 00 3688-99 P co CCGG 126.680 -999.990 ... R5 2007 08 07 12 56 00 44.0839 76.8712 600.00 595.00 5.00 239596 KZD 2007 07 15 05 08 00 4259-99 P co CCGG 112.870 -999.990 ... R5 2007 08 07 11 45 00 44.0839 76.8712 600.00 595.00 5.00 239593 KZD 2007 07 15 05 08 00 4260-99 P co CCGG 113.250 -999.990 ... R5 2007 08 07 11 59 00 44.0839 76.8712 600.00 595.00 5.00 239594 KZD 2007 07 21 06 05 00 3441-99 P co CCGG 123.620 -999.990 ... R5 2007 08 15 11 28 00 44.0839 76.8712 600.00 595.00 5.00 239968 KZD 2007 07 21 06 05 00 3442-99 P co CCGG 123.320 -999.990 ... R5 2007 08 15 11 42 00 44.0839 76.8712 600.00 595.00 5.00 239969 KZD 2007 07 29 04 57 00 6397-66 P co CCGG 141.320 -999.990 ... R5 2007 08 15 11 56 00 44.0839 76.8712 600.00 595.00 5.00 239970 KZD 2007 07 29 04 57 00 6398-66 P co CCGG 141.430 -999.990 ... R5 2007 08 15 12 10 00 44.0839 76.8712 600.00 595.00 5.00 239971 KZD 2007 08 04 05 49 00 1965-99 P co CCGG 177.940 -999.990 ... R5 2007 09 07 15 14 00 44.0839 76.8712 600.00 595.00 5.00 241101 KZD 2007 08 04 05 49 00 1966-99 P co CCGG 178.190 -999.990 ... R5 2007 09 07 15 28 00 44.0839 76.8712 600.00 595.00 5.00 241102 KZD 2007 08 12 06 23 00 6903-66 P co CCGG 98.270 -999.990 ... R5 2007 09 07 14 45 00 44.0839 76.8712 600.00 595.00 5.00 241099 KZD 2007 08 12 06 23 00 6904-66 P co CCGG 98.180 -999.990 ... R5 2007 09 07 15 00 00 44.0839 76.8712 600.00 595.00 5.00 241100 KZD 2007 08 18 05 42 00 1743-99 P co CCGG 105.650 -999.990 ... R5 2007 09 21 14 05 00 44.0839 76.8712 600.00 595.00 5.00 241942 KZD 2007 08 18 05 42 00 1744-99 P co CCGG 106.030 -999.990 ... R5 2007 09 21 14 19 00 44.0839 76.8712 600.00 595.00 5.00 241943 KZD 2007 08 25 05 46 00 3765-99 P co CCGG 125.000 -999.990 ... R5 2007 09 21 14 33 00 44.0839 76.8712 600.00 595.00 5.00 241940 KZD 2007 08 25 05 46 00 3766-99 P co CCGG 124.700 -999.990 ... R5 2007 09 21 14 48 00 44.0839 76.8712 600.00 595.00 5.00 241941 KZD 2007 09 01 05 16 00 635-99 P co CCGG 184.800 -999.990 ... R5 2007 09 26 13 20 00 44.0839 76.8712 600.00 595.00 5.00 242384 KZD 2007 09 01 05 16 00 636-99 P co CCGG 185.760 -999.990 ... R5 2007 09 26 13 34 00 44.0839 76.8712 600.00 595.00 5.00 242385 KZD 2007 09 08 04 58 00 81-99 P co CCGG 122.190 -999.990 ... R5 2007 09 26 14 17 00 44.0839 76.8712 600.00 595.00 5.00 242382 KZD 2007 09 08 04 58 00 82-99 P co CCGG 121.760 -999.990 ... R5 2007 09 26 14 31 00 44.0839 76.8712 600.00 595.00 5.00 242383 KZD 2007 09 15 05 36 00 1867-99 P co CCGG 135.400 -999.990 ... R5 2007 10 11 10 32 00 44.0839 76.8712 600.00 595.00 5.00 242979 KZD 2007 09 15 05 36 00 1868-99 P co CCGG 132.460 -999.990 ... R5 2007 10 11 10 46 00 44.0839 76.8712 600.00 595.00 5.00 242980 KZD 2007 09 22 06 22 00 3523-99 P co CCGG 126.040 -999.990 ... R5 2007 10 11 11 00 00 44.0839 76.8712 600.00 595.00 5.00 242977 KZD 2007 09 22 06 22 00 3524-99 P co CCGG 126.570 -999.990 ... R5 2007 10 11 11 15 00 44.0839 76.8712 600.00 595.00 5.00 242978 KZD 2007 09 29 05 08 00 2207-99 P co CCGG 126.780 -999.990 ..> R5 2007 11 27 12 10 00 44.0839 76.8712 600.00 595.00 5.00 245362 KZD 2007 09 29 05 08 00 2208-99 P co CCGG 126.260 -999.990 ... R5 2007 11 27 12 24 00 44.0839 76.8712 600.00 595.00 5.00 245363 KZD 2007 10 06 05 43 00 2637-99 P co CCGG 128.560 -999.990 ... R5 2007 11 27 11 41 00 44.0839 76.8712 600.00 595.00 5.00 245360 KZD 2007 10 06 05 43 00 2638-99 P co CCGG 128.170 -999.990 ..< R5 2007 11 27 11 55 00 44.0839 76.8712 600.00 595.00 5.00 245361 KZD 2007 10 12 05 00 00 1421-99 P co CCGG 224.270 -999.990 .X. R5 2007 11 26 12 47 00 44.0839 76.8712 600.00 595.00 5.00 245346 KZD 2007 10 12 05 00 00 1422-99 P co CCGG 223.910 -999.990 .X. R5 2007 11 26 13 02 00 44.0839 76.8712 600.00 595.00 5.00 245347 KZD 2007 10 19 05 02 00 6023-66 P co CCGG 224.940 -999.990 .X. R5 2007 11 26 12 19 00 44.0839 76.8712 600.00 595.00 5.00 245344 KZD 2007 10 19 05 02 00 6024-66 P co CCGG 224.830 -999.990 .X. R5 2007 11 26 12 33 00 44.0839 76.8712 600.00 595.00 5.00 245345 KZD 2007 10 26 04 45 00 4567-99 P co CCGG 111.610 -999.990 ... R5 2007 11 27 12 38 00 44.0839 76.8712 600.00 595.00 5.00 245364 KZD 2007 10 26 04 45 00 4568-99 P co CCGG 111.680 -999.990 ... R5 2007 11 27 12 52 00 44.0839 76.8712 600.00 595.00 5.00 245365 KZD 2007 11 02 04 45 00 6365-66 P co CCGG 263.100 -999.990 P.C R5 2007 11 27 13 06 00 44.0839 76.8712 600.00 595.00 5.00 245366 KZD 2007 11 02 04 45 00 6366-66 P co CCGG 266.720 -999.990 P.C R5 2007 11 27 13 21 00 44.0839 76.8712 600.00 595.00 5.00 245367 KZD 2007 11 10 06 47 00 1437-99 P co CCGG 142.930 -999.990 ... R5 2007 12 10 14 47 00 44.0839 76.8712 600.00 595.00 5.00 245975 KZD 2007 11 10 06 47 00 1438-99 P co CCGG 143.140 -999.990 ... R5 2007 12 10 15 02 00 44.0839 76.8712 600.00 595.00 5.00 245976 KZD 2007 11 17 06 03 00 3373-99 P co CCGG 210.440 -999.990 .N. R5 2007 12 10 15 16 00 44.0839 76.8712 600.00 595.00 5.00 245974 KZD 2007 11 24 06 26 00 4551-99 P co CCGG 135.950 -999.990 ... R5 2008 02 14 14 41 00 44.0839 76.8712 600.00 595.00 5.00 249367 KZD 2007 12 01 05 53 00 1965-99 P co CCGG 131.580 -999.990 ... R5 2008 02 14 13 58 00 44.0839 76.8712 600.00 595.00 5.00 249365 KZD 2007 12 01 05 53 00 1966-99 P co CCGG 132.140 -999.990 ... R5 2008 02 14 14 13 00 44.0839 76.8712 600.00 595.00 5.00 249366 KZD 2007 12 08 06 33 00 193-99 P co CCGG 139.910 -999.990 ... V2 2008 02 29 09 53 00 44.0839 76.8712 600.00 595.00 5.00 250084 KZD 2007 12 08 06 33 00 194-99 P co CCGG 139.700 -999.990 ... V2 2008 02 29 10 09 00 44.0839 76.8712 600.00 595.00 5.00 250085 KZD 2007 12 15 06 06 00 2355-99 P co CCGG 310.560 -999.990 .X. V2 2008 02 29 10 24 00 44.0839 76.8712 600.00 595.00 5.00 250082 KZD 2007 12 15 06 06 00 2356-99 P co CCGG 310.500 -999.990 .X. V2 2008 02 29 10 39 00 44.0839 76.8712 600.00 595.00 5.00 250083 KZD 2007 12 22 06 59 00 4147-99 P co CCGG 373.680 -999.990 .XC R5 2008 02 14 14 55 00 44.0839 76.8712 600.00 595.00 5.00 249369 KZD 2007 12 22 06 59 00 4148-99 P co CCGG 370.860 -999.990 .XC R5 2008 02 14 15 10 00 44.0839 76.8712 600.00 595.00 5.00 249370 KZD 2007 12 29 08 04 00 1592-99 P co CCGG 591.460 -999.990 .NC R5 2008 02 14 14 27 00 44.0839 76.8712 600.00 595.00 5.00 249368 KZD 2008 01 05 05 51 00 4695-99 P co CCGG 213.890 -999.990 ... V2 2008 02 14 11 56 00 44.0839 76.8712 600.00 595.00 5.00 249391 KZD 2008 01 05 05 51 00 4696-99 P co CCGG 214.330 -999.990 ... V2 2008 02 14 12 11 00 44.0839 76.8712 600.00 595.00 5.00 249392 KZD 2008 01 12 06 17 00 905-99 P co CCGG 713.060 -999.990 .XC V2 2008 02 14 10 54 00 44.0839 76.8712 600.00 595.00 5.00 249389 KZD 2008 01 12 06 17 00 906-99 P co CCGG 712.140 -999.990 .XC V2 2008 02 14 11 09 00 44.0839 76.8712 600.00 595.00 5.00 249390 KZD 2008 01 19 05 55 00 433-99 P co CCGG 239.060 -999.990 ..C V2 2008 02 28 15 20 00 44.0839 76.8712 600.00 595.00 5.00 250072 KZD 2008 01 19 05 55 00 434-99 P co CCGG 239.350 -999.990 ... V2 2008 02 28 15 36 00 44.0839 76.8712 600.00 595.00 5.00 250073 KZD 2008 01 26 05 25 00 3979-99 P co CCGG 862.890 -999.990 .XC V2 2008 02 28 15 51 00 44.0839 76.8712 600.00 595.00 5.00 250070 KZD 2008 01 26 05 25 00 3980-99 P co CCGG 861.850 -999.990 .XC V2 2008 02 28 16 07 00 44.0839 76.8712 600.00 595.00 5.00 250071 KZD 2008 02 02 05 24 00 3435-99 P co CCGG 398.810 -999.990 .XC V2 2008 03 07 16 53 00 44.0839 76.8712 600.00 595.00 5.00 250612 KZD 2008 02 02 05 24 00 3436-99 P co CCGG 397.540 -999.990 .XC V2 2008 03 07 17 08 00 44.0839 76.8712 600.00 595.00 5.00 250613 KZD 2008 02 09 05 29 00 2635-99 P co CCGG 345.290 -999.990 .XC V2 2008 03 07 17 23 00 44.0839 76.8712 600.00 595.00 5.00 250610 KZD 2008 02 09 05 29 00 2636-99 P co CCGG 348.610 -999.990 .XC V2 2008 03 07 17 39 00 44.0839 76.8712 600.00 595.00 5.00 250611 KZD 2008 02 20 07 16 00 2787-99 P co CCGG 213.060 -999.990 ... V2 2008 03 19 09 38 00 44.0839 76.8712 600.00 595.00 5.00 251093 KZD 2008 02 20 07 16 00 2788-99 P co CCGG 213.650 -999.990 ... V2 2008 03 19 09 54 00 44.0839 76.8712 600.00 595.00 5.00 251094 KZD 2008 02 25 06 05 00 221-99 P co CCGG 417.980 -999.990 .XC V2 2008 03 19 10 40 00 44.0839 76.8712 600.00 595.00 5.00 251091 KZD 2008 02 25 06 05 00 222-99 P co CCGG 417.340 -999.990 .XC V2 2008 03 19 10 55 00 44.0839 76.8712 600.00 595.00 5.00 251092 KZD 2008 03 02 06 11 00 2249-99 P co CCGG 471.900 -999.990 .XC R5 2008 04 09 13 33 00 44.0839 76.8712 600.00 595.00 5.00 252138 KZD 2008 03 02 06 11 00 2250-99 P co CCGG 471.400 -999.990 .XC R5 2008 04 09 13 47 00 44.0839 76.8712 600.00 595.00 5.00 252139 KZD 2008 03 12 08 53 00 1089-99 P co CCGG 184.440 -999.990 ... R5 2008 04 17 12 32 00 44.0839 76.8712 600.00 595.00 5.00 252748 KZD 2008 03 12 08 53 00 1090-99 P co CCGG 184.470 -999.990 ... R5 2008 04 17 12 47 00 44.0839 76.8712 600.00 595.00 5.00 252749 KZD 2008 03 16 06 01 00 4073-99 P co CCGG 146.450 -999.990 ... R5 2008 04 09 12 36 00 44.0839 76.8712 600.00 595.00 5.00 252134 KZD 2008 03 16 06 01 00 4074-99 P co CCGG 146.170 -999.990 ... R5 2008 04 09 12 50 00 44.0839 76.8712 600.00 595.00 5.00 252135 KZD 2008 03 22 05 20 00 2955-99 P co CCGG 248.030 -999.990 ..C R5 2008 04 09 10 13 00 44.0839 76.8712 600.00 595.00 5.00 252132 KZD 2008 03 22 05 20 00 2956-99 P co CCGG 247.450 -999.990 ..C R5 2008 04 09 10 28 00 44.0839 76.8712 600.00 595.00 5.00 252133 KZD 2008 03 30 05 24 00 3455-99 P co CCGG 166.690 -999.990 ... R5 2008 04 17 12 04 00 44.0839 76.8712 600.00 595.00 5.00 252746 KZD 2008 03 30 05 24 00 3456-99 P co CCGG 166.050 -999.990 ... R5 2008 04 17 12 18 00 44.0839 76.8712 600.00 595.00 5.00 252747 KZD 2008 04 05 05 38 00 3945-99 P co CCGG 158.800 -999.990 ... V2 2008 05 20 11 43 00 44.0839 76.8712 600.00 595.00 5.00 254425 KZD 2008 04 05 05 38 00 3946-99 P co CCGG 158.980 -999.990 ... V2 2008 05 20 11 58 00 44.0839 76.8712 600.00 595.00 5.00 254426 KZD 2008 04 12 06 00 00 3389-99 P co CCGG 166.240 -999.990 ... V2 2008 05 20 11 12 00 44.0839 76.8712 600.00 595.00 5.00 254423 KZD 2008 04 12 06 00 00 3390-99 P co CCGG 166.000 -999.990 ... V2 2008 05 20 11 27 00 44.0839 76.8712 600.00 595.00 5.00 254424 KZD 2008 04 20 11 45 00 905-99 P co CCGG 168.850 -999.990 ... V2 2008 06 18 10 49 00 44.0839 76.8712 600.00 595.00 5.00 255840 KZD 2008 04 20 11 45 00 906-99 P co CCGG 168.200 -999.990 ... V2 2008 06 18 11 05 00 44.0839 76.8712 600.00 595.00 5.00 255841 KZD 2008 04 27 05 18 00 4671-99 P co CCGG 136.710 -999.990 ... V2 2008 06 18 10 19 00 44.0839 76.8712 600.00 595.00 5.00 255838 KZD 2008 04 27 05 18 00 4672-99 P co CCGG 136.490 -999.990 ... V2 2008 06 18 10 34 00 44.0839 76.8712 600.00 595.00 5.00 255839 KZD 2008 05 04 05 10 00 2669-99 P co CCGG 152.330 -999.990 ... V2 2008 06 06 11 43 00 44.0839 76.8712 600.00 595.00 5.00 255141 KZD 2008 05 04 05 10 00 2670-99 P co CCGG 152.680 -999.990 ... V2 2008 06 06 11 58 00 44.0839 76.8712 600.00 595.00 5.00 255142 KZD 2008 05 10 04 48 00 4915-99 P co CCGG 135.100 -999.990 ... V2 2008 06 06 11 12 00 44.0839 76.8712 600.00 595.00 5.00 255143 KZD 2008 05 10 04 48 00 4916-99 P co CCGG 134.950 -999.990 ... V2 2008 06 06 11 27 00 44.0839 76.8712 600.00 595.00 5.00 255144 KZD 2008 05 17 04 35 00 3271-99 P co CCGG 133.970 -999.990 ... V2 2008 06 16 13 29 00 44.0839 76.8712 600.00 595.00 5.00 255689 KZD 2008 05 17 04 35 00 3272-99 P co CCGG 134.290 -999.990 ... V2 2008 06 16 13 44 00 44.0839 76.8712 600.00 595.00 5.00 255690 KZD 2008 05 24 04 30 00 3781-99 P co CCGG 131.170 -999.990 ... V2 2008 06 16 12 58 00 44.0839 76.8712 600.00 595.00 5.00 255691 KZD 2008 05 24 04 30 00 3782-99 P co CCGG 130.410 -999.990 ... V2 2008 06 16 13 13 00 44.0839 76.8712 600.00 595.00 5.00 255692 KZD 2008 05 30 05 20 00 347-99 P co CCGG 150.870 -999.990 ... R5 2008 07 17 10 34 00 44.0839 76.8712 600.00 595.00 5.00 257520 KZD 2008 05 30 05 20 00 348-99 P co CCGG 149.520 -999.990 ... R5 2008 07 17 10 48 00 44.0839 76.8712 600.00 595.00 5.00 257521 KZD 2008 06 06 05 15 00 2867-99 P co CCGG 144.470 -999.990 ... R5 2008 07 17 10 05 00 44.0839 76.8712 600.00 595.00 5.00 257522 KZD 2008 06 06 05 15 00 2868-99 P co CCGG 143.340 -999.990 ... R5 2008 07 17 10 20 00 44.0839 76.8712 600.00 595.00 5.00 257523 KZD 2008 06 13 04 50 00 4371-99 P co CCGG 117.340 -999.990 ... R5 2008 07 17 11 03 00 44.0839 76.8712 600.00 595.00 5.00 257524 KZD 2008 06 13 04 50 00 4372-99 P co CCGG 117.180 -999.990 ... R5 2008 07 17 11 17 00 44.0839 76.8712 600.00 595.00 5.00 257525 KZD 2008 06 20 05 05 00 4575-99 P co CCGG 124.830 -999.990 ... R5 2008 07 17 11 31 00 44.0839 76.8712 600.00 595.00 5.00 257526 KZD 2008 06 20 05 05 00 4576-99 P co CCGG 125.490 -999.990 ... R5 2008 07 17 11 45 00 44.0839 76.8712 600.00 595.00 5.00 257527 KZD 2008 06 27 06 14 00 6037-66 P co CCGG 120.150 -999.990 ... V2 2008 07 29 09 48 00 44.0839 76.8712 600.00 595.00 5.00 258109 KZD 2008 06 27 06 14 00 6038-66 P co CCGG 120.490 -999.990 ... V2 2008 07 29 10 03 00 44.0839 76.8712 600.00 595.00 5.00 258110 KZD 2008 07 05 05 34 00 535-99 P co CCGG 121.190 -999.990 ... V2 2008 07 29 10 19 00 44.0839 76.8712 600.00 595.00 5.00 258107 KZD 2008 07 05 05 34 00 536-99 P co CCGG 120.660 -999.990 ... V2 2008 07 29 10 34 00 44.0839 76.8712 600.00 595.00 5.00 258108 KZD 2008 07 12 04 58 00 2747-99 P co CCGG 166.720 -999.990 ... V2 2008 08 08 13 14 00 44.0839 76.8712 600.00 595.00 5.00 258876 KZD 2008 07 12 04 58 00 2748-99 P co CCGG 167.580 -999.990 ... V2 2008 08 08 13 29 00 44.0839 76.8712 600.00 595.00 5.00 258877 KZD 2008 07 19 05 14 00 1421-99 P co CCGG 125.110 -999.990 ... V2 2008 08 08 15 01 00 44.0839 76.8712 600.00 595.00 5.00 258878 KZD 2008 07 19 05 14 00 1422-99 P co CCGG 124.710 -999.990 ... V2 2008 08 08 14 46 00 44.0839 76.8712 600.00 595.00 5.00 258879 KZD 2008 07 25 06 45 00 1519-99 P co CCGG 112.040 -999.990 ... V2 2008 09 02 15 50 00 44.0839 76.8712 600.00 595.00 5.00 259932 KZD 2008 07 25 06 45 00 1520-99 P co CCGG 113.310 -999.990 ... V2 2008 09 02 16 05 00 44.0839 76.8712 600.00 595.00 5.00 259933 KZD 2008 08 02 05 16 00 2631-99 P co CCGG 141.060 -999.990 ... V2 2008 09 02 14 48 00 44.0839 76.8712 600.00 595.00 5.00 259930 KZD 2008 08 02 05 16 00 2632-99 P co CCGG 140.830 -999.990 ... V2 2008 09 02 15 04 00 44.0839 76.8712 600.00 595.00 5.00 259931 KZD 2008 08 09 05 19 00 2281-99 P co CCGG 143.180 -999.990 ... V2 2008 09 10 13 03 00 44.0839 76.8712 600.00 595.00 5.00 260451 KZD 2008 08 09 05 19 00 2282-99 P co CCGG 143.000 -999.990 ... V2 2008 09 10 13 18 00 44.0839 76.8712 600.00 595.00 5.00 260452 KZD 2008 08 16 05 03 00 4177-99 P co CCGG 119.520 -999.990 ... V2 2008 09 10 12 32 00 44.0839 76.8712 600.00 595.00 5.00 260449 KZD 2008 08 16 05 03 00 4178-99 P co CCGG 119.080 -999.990 ... V2 2008 09 10 12 47 00 44.0839 76.8712 600.00 595.00 5.00 260450 KZD 2008 08 23 05 07 00 6215-66 P co CCGG 194.050 -999.990 .X. R5 2008 09 25 09 55 00 44.0839 76.8712 600.00 595.00 5.00 261399 KZD 2008 08 23 05 07 00 6216-66 P co CCGG 193.390 -999.990 .X. R5 2008 09 25 10 09 00 44.0839 76.8712 600.00 595.00 5.00 261400 KZD 2008 08 30 04 28 00 4611-99 P co CCGG 120.220 -999.990 ... R5 2008 09 25 10 52 00 44.0839 76.8712 600.00 595.00 5.00 261401 KZD 2008 08 30 04 28 00 4612-99 P co CCGG 120.780 -999.990 ... R5 2008 09 25 11 06 00 44.0839 76.8712 600.00 595.00 5.00 261402 KZD 2008 09 06 05 09 00 6313-66 P co CCGG 107.930 -999.990 ... R5 2008 10 22 16 22 00 44.0839 76.8712 600.00 595.00 5.00 262606 KZD 2008 09 06 05 09 00 6314-66 P co CCGG 105.640 -999.990 ... R5 2008 10 22 16 37 00 44.0839 76.8712 600.00 595.00 5.00 262607 KZD 2008 09 13 05 49 00 3983-99 P co CCGG 116.340 -999.990 ... R5 2008 10 22 16 51 00 44.0839 76.8712 600.00 595.00 5.00 262604 KZD 2008 09 13 05 49 00 3984-99 P co CCGG 117.000 -999.990 ... R5 2008 10 22 17 05 00 44.0839 76.8712 600.00 595.00 5.00 262605 KZD 2008 09 22 05 51 00 3989-99 P co CCGG 98.200 -999.990 ... V2 2008 10 22 12 10 00 44.0839 76.8712 600.00 595.00 5.00 262586 KZD 2008 09 22 05 51 00 3990-99 P co CCGG 98.290 -999.990 ... V2 2008 10 22 12 25 00 44.0839 76.8712 600.00 595.00 5.00 262587 KZD 2008 09 27 06 09 00 3941-99 P co CCGG 133.150 -999.990 ... V2 2008 10 22 12 40 00 44.0839 76.8712 600.00 595.00 5.00 262584 KZD 2008 09 27 06 09 00 3942-99 P co CCGG 132.740 -999.990 ... V2 2008 10 22 12 56 00 44.0839 76.8712 600.00 595.00 5.00 262585 KZD 2008 10 04 05 33 00 6047-66 P co CCGG 151.710 -999.990 ... V2 2008 10 30 11 19 00 44.0839 76.8712 600.00 595.00 5.00 263233 KZD 2008 10 04 05 33 00 6048-66 P co CCGG 152.110 -999.990 ... V2 2008 10 30 11 35 00 44.0839 76.8712 600.00 595.00 5.00 263234 KZD 2008 10 11 05 29 00 895-99 P co CCGG 161.580 -999.990 ... V2 2008 10 30 11 50 00 44.0839 76.8712 600.00 595.00 5.00 263231 KZD 2008 10 11 05 29 00 896-99 P co CCGG 162.800 -999.990 ... V2 2008 10 30 12 06 00 44.0839 76.8712 600.00 595.00 5.00 263232 KZD 2008 10 18 06 08 00 2671-99 P co CCGG 294.980 -999.990 .N. V2 2008 11 13 10 41 00 44.0839 76.8712 600.00 595.00 5.00 263895 KZD 2008 10 18 06 08 00 2672-99 P co CCGG 298.740 -999.990 .N. V2 2008 11 13 10 57 00 44.0839 76.8712 600.00 595.00 5.00 263896 KZD 2008 10 26 05 47 00 2493-99 P co CCGG 112.620 -999.990 ... V2 2008 11 13 10 10 00 44.0839 76.8712 600.00 595.00 5.00 263893 KZD 2008 10 26 05 47 00 2494-99 P co CCGG 111.980 -999.990 ... V2 2008 11 13 10 26 00 44.0839 76.8712 600.00 595.00 5.00 263894 KZD 2008 11 01 05 10 00 5035-99 P co CCGG 101.100 -999.990 ... V2 2008 12 10 10 55 00 44.0839 76.8712 600.00 595.00 5.00 265089 KZD 2008 11 01 05 10 00 5036-99 P co CCGG 101.520 -999.990 ... V2 2008 12 10 11 10 00 44.0839 76.8712 600.00 595.00 5.00 265090 KZD 2008 11 08 09 06 00 1299-99 P co CCGG 113.510 -999.990 ... V2 2008 12 11 15 15 00 44.0839 76.8712 600.00 595.00 5.00 265088 KZD 2008 11 15 05 45 00 1311-99 P co CCGG 146.930 -999.990 ... R5 2009 04 08 16 12 00 44.0839 76.8712 600.00 595.00 5.00 272963 KZD 2008 11 15 05 45 00 1312-99 P co CCGG 145.570 -999.990 ... R5 2009 04 08 16 27 00 44.0839 76.8712 600.00 595.00 5.00 272964 KZD 2008 11 23 05 45 00 2711-99 P co CCGG 332.640 -999.990 .NC V2 2009 04 07 11 34 00 44.0839 76.8712 600.00 595.00 5.00 272965 KZD 2008 11 23 05 45 00 2712-99 P co CCGG 330.580 -999.990 .NC V2 2009 04 07 11 49 00 44.0839 76.8712 600.00 595.00 5.00 272966 KZD 2008 11 30 05 23 00 4441-99 P co CCGG 301.280 -999.990 .NC V2 2009 04 08 15 08 00 44.0839 76.8712 600.00 595.00 5.00 272957 KZD 2008 11 30 05 23 00 4442-99 P co CCGG 304.330 -999.990 .NC V2 2009 04 08 15 24 00 44.0839 76.8712 600.00 595.00 5.00 272958 KZD 2008 12 07 05 24 00 4091-99 P co CCGG 437.310 -999.990 .NC V2 2009 04 07 15 10 00 44.0839 76.8712 600.00 595.00 5.00 272947 KZD 2008 12 07 05 24 00 4092-99 P co CCGG 435.760 -999.990 .NC V2 2009 04 07 15 25 00 44.0839 76.8712 600.00 595.00 5.00 272948 KZD 2008 12 13 05 30 00 4983-99 P co CCGG 642.920 -999.990 P.C V2 2009 04 07 12 36 00 44.0839 76.8712 600.00 595.00 5.00 272969 KZD 2008 12 13 05 30 00 4984-99 P co CCGG 421.800 -999.990 P.C V2 2009 04 07 12 51 00 44.0839 76.8712 600.00 595.00 5.00 272970 KZD 2008 12 21 05 59 00 3071-99 P co CCGG 235.660 -999.990 ... V2 2009 04 07 12 05 00 44.0839 76.8712 600.00 595.00 5.00 272967 KZD 2008 12 21 05 59 00 3072-99 P co CCGG 235.950 -999.990 ... V2 2009 04 07 12 20 00 44.0839 76.8712 600.00 595.00 5.00 272968 KZD 2008 12 28 04 59 00 553-99 P co CCGG 226.760 -999.990 ... V2 2009 04 07 14 39 00 44.0839 76.8712 600.00 595.00 5.00 272945 KZD 2008 12 28 04 59 00 554-99 P co CCGG 223.830 -999.990 ... V2 2009 04 07 14 54 00 44.0839 76.8712 600.00 595.00 5.00 272946 KZD 2009 01 03 05 48 00 3151-99 P co CCGG 419.890 -999.990 .NC V2 2009 04 07 14 08 00 44.0839 76.8712 600.00 595.00 5.00 272943 KZD 2009 01 03 05 48 00 3152-99 P co CCGG 421.460 -999.990 .NC V2 2009 04 07 14 23 00 44.0839 76.8712 600.00 595.00 5.00 272944 KZD 2009 01 10 06 01 00 655-99 P co CCGG 400.210 -999.990 .NC V2 2009 04 06 17 12 00 44.0839 76.8712 600.00 595.00 5.00 272871 KZD 2009 01 10 06 01 00 656-99 P co CCGG 401.130 -999.990 .NC V2 2009 04 06 17 28 00 44.0839 76.8712 600.00 595.00 5.00 272872 KZD 2009 01 17 05 51 00 981-99 P co CCGG 232.400 -999.990 ... V2 2009 04 06 16 42 00 44.0839 76.8712 600.00 595.00 5.00 272869 KZD 2009 01 17 05 51 00 982-99 P co CCGG 232.540 -999.990 ... V2 2009 04 06 16 57 00 44.0839 76.8712 600.00 595.00 5.00 272870 KZD 2009 01 24 05 06 00 4593-99 P co CCGG 187.960 -999.990 ... V2 2009 04 08 16 10 00 44.0839 76.8712 600.00 595.00 5.00 272961 KZD 2009 01 24 05 06 00 4594-99 P co CCGG 187.870 -999.990 ... V2 2009 04 08 16 25 00 44.0839 76.8712 600.00 595.00 5.00 272962 KZD 2009 01 31 05 07 00 2239-99 P co CCGG 180.380 -999.990 ... V2 2009 04 08 15 39 00 44.0839 76.8712 600.00 595.00 5.00 272959 KZD 2009 01 31 05 07 00 2240-99 P co CCGG 179.300 -999.990 ... V2 2009 04 08 15 54 00 44.0839 76.8712 600.00 595.00 5.00 272960 KZD 2009 02 07 05 45 00 2399-99 P co CCGG 348.380 -999.990 .NC V2 2009 04 07 13 06 00 44.0839 76.8712 600.00 595.00 5.00 272971 KZD 2009 02 07 05 45 00 2400-99 P co CCGG 347.630 -999.990 .NC V2 2009 04 07 13 22 00 44.0839 76.8712 600.00 595.00 5.00 272972 KZD 2009 02 15 05 00 00 4000-99 P co CCGG 176.330 -999.990 ... R5 2009 04 07 10 57 00 44.0839 76.8712 600.00 595.00 5.00 272917 KZD 2009 04 18 10 56 00 3679-99 P co CCGG 145.280 -999.990 ... R5 2009 07 01 12 58 00 44.0839 76.8712 600.00 595.00 5.00 277598 KZD 2009 04 18 10 56 00 3680-99 P co CCGG 146.170 -999.990 ... R5 2009 07 01 13 12 00 44.0839 76.8712 600.00 595.00 5.00 277599 KZD 2009 04 25 04 57 00 3129-99 P co CCGG 136.790 -999.990 ... R5 2009 05 27 11 56 00 44.0839 76.8712 600.00 595.00 5.00 275818 KZD 2009 04 25 04 57 00 3130-99 P co CCGG 136.330 -999.990 ... R5 2009 05 27 12 10 00 44.0839 76.8712 600.00 595.00 5.00 275819 KZD 2009 05 03 05 06 00 1741-99 P co CCGG 125.170 -999.990 ... R5 2009 05 27 12 25 00 44.0839 76.8712 600.00 595.00 5.00 275816 KZD 2009 05 03 05 06 00 1742-99 P co CCGG 126.230 -999.990 ... R5 2009 05 27 12 39 00 44.0839 76.8712 600.00 595.00 5.00 275817 KZD 2009 05 09 05 36 00 2883-99 P co CCGG 148.470 -999.990 ... R5 2009 06 18 14 49 00 44.0839 76.8712 600.00 595.00 5.00 276805 KZD 2009 05 09 05 36 00 2884-99 P co CCGG 148.230 -999.990 ... R5 2009 06 18 15 03 00 44.0839 76.8712 600.00 595.00 5.00 276806 KZD 2009 05 17 11 23 00 1947-99 P co CCGG 133.940 -999.990 ... R5 2009 06 18 14 21 00 44.0839 76.8712 600.00 595.00 5.00 276803 KZD 2009 05 17 11 23 00 1948-99 P co CCGG 134.350 -999.990 ... R5 2009 06 18 14 35 00 44.0839 76.8712 600.00 595.00 5.00 276804 KZD 2009 05 23 05 02 00 4549-99 P co CCGG 122.890 -999.990 ... V2 2009 07 06 13 51 00 44.0839 76.8712 600.00 595.00 5.00 277608 KZD 2009 05 23 05 02 00 4550-99 P co CCGG 121.970 -999.990 ... V2 2009 07 06 14 07 00 44.0839 76.8712 600.00 595.00 5.00 277609 KZD 2009 05 30 05 28 00 4019-99 P co CCGG 133.560 -999.990 ... R5 2009 07 06 13 03 00 44.0839 76.8712 600.00 595.00 5.00 277606 KZD 2009 05 30 05 28 00 4020-99 P co CCGG 132.400 -999.990 ... R5 2009 07 06 13 18 00 44.0839 76.8712 600.00 595.00 5.00 277607 KZD 2009 06 06 05 02 00 1111-99 P co CCGG 119.890 -999.990 ... V2 2009 07 22 13 04 00 44.0839 76.8712 600.00 595.00 5.00 279476 KZD 2009 06 06 05 02 00 1112-99 P co CCGG 119.740 -999.990 ... V2 2009 07 22 13 19 00 44.0839 76.8712 600.00 595.00 5.00 279477 KZD 2009 06 13 05 23 00 5029-99 P co CCGG 115.430 -999.990 ... V2 2009 07 22 13 35 00 44.0839 76.8712 600.00 595.00 5.00 279474 KZD 2009 06 13 05 23 00 5030-99 P co CCGG 115.090 -999.990 ... V2 2009 07 22 13 50 00 44.0839 76.8712 600.00 595.00 5.00 279475 KZD 2009 06 20 05 34 00 587-99 P co CCGG 127.140 -999.990 ... R5 2009 07 28 10 59 00 44.0839 76.8712 600.00 595.00 5.00 279929 KZD 2009 06 20 05 34 00 588-99 P co CCGG 125.260 -999.990 ... R5 2009 07 28 11 13 00 44.0839 76.8712 600.00 595.00 5.00 279930 KZD 2009 06 27 05 24 00 4277-99 P co CCGG 116.530 -999.990 ... V2 2009 07 27 17 44 00 44.0839 76.8712 600.00 595.00 5.00 279927 KZD 2009 06 27 05 24 00 4278-99 P co CCGG 115.730 -999.990 ... V2 2009 07 27 17 59 00 44.0839 76.8712 600.00 595.00 5.00 279928 KZD 2009 07 04 05 14 00 3537-99 P co CCGG 109.760 -999.990 ... R5 2009 08 05 11 35 00 44.0839 76.8712 600.00 595.00 5.00 280550 KZD 2009 07 04 05 14 00 3538-99 P co CCGG 110.830 -999.990 ... R5 2009 08 05 11 49 00 44.0839 76.8712 600.00 595.00 5.00 280551 KZD 2009 07 11 05 10 00 301-99 P co CCGG 128.670 -999.990 ... R5 2009 08 05 12 32 00 44.0839 76.8712 600.00 595.00 5.00 280548 KZD 2009 07 11 05 10 00 302-99 P co CCGG 129.210 -999.990 ... R5 2009 08 05 12 46 00 44.0839 76.8712 600.00 595.00 5.00 280549 KZD 2009 07 18 04 59 00 4153-99 P co CCGG 125.510 -999.990 ... V2 2009 08 18 10 17 00 44.0839 76.8712 600.00 595.00 5.00 281466 KZD 2009 07 18 04 59 00 4154-99 P co CCGG 125.660 -999.990 ... V2 2009 08 18 10 33 00 44.0839 76.8712 600.00 595.00 5.00 281467 KZD 2009 07 25 04 59 00 4533-99 P co CCGG 113.680 -999.990 P.. V2 2009 08 18 12 21 00 44.0839 76.8712 600.00 595.00 5.00 281464 KZD 2009 07 25 04 59 00 4534-99 P co CCGG 107.000 -999.990 P.. V2 2009 08 18 12 36 00 44.0839 76.8712 600.00 595.00 5.00 281465 KZD 2009 08 01 05 03 00 127-99 P co CCGG 125.280 -999.990 ... R5 2009 08 31 14 05 00 44.0839 76.8712 600.00 595.00 5.00 282185 KZD 2009 08 01 05 03 00 128-99 P co CCGG 123.930 -999.990 ... R5 2009 08 31 14 19 00 44.0839 76.8712 600.00 595.00 5.00 282186 KZD 2009 08 08 04 48 00 4737-99 P co CCGG 140.030 -999.990 ... R5 2009 08 31 13 36 00 44.0839 76.8712 600.00 595.00 5.00 282183 KZD 2009 08 08 04 48 00 4738-99 P co CCGG 137.410 -999.990 ... R5 2009 08 31 13 51 00 44.0839 76.8712 600.00 595.00 5.00 282184 KZD 2009 08 15 04 54 00 5053-99 P co CCGG 100.780 -999.990 ... V2 2010 01 05 11 18 00 44.0839 76.8712 600.00 595.00 5.00 287974