# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Centro de Investigacion de la Baja Atmosfera, # collaborator_name: Univ. of Valladolid [CIBA] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: cib # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2019-12-31 # description_creation-time: 2020-08-31 16:42:41 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number CIB 2009 05 05 10 35 00 1829-99 G co CCGG 140.710 -999.990 ... V2 2009 05 22 12 31 00 41.8100 -4.9300 850.00 845.00 5.00 275650 CIB 2009 05 05 10 35 00 1830-99 G co CCGG 140.690 -999.990 ... V2 2009 05 22 12 47 00 41.8100 -4.9300 850.00 845.00 5.00 275651 CIB 2009 05 11 09 22 00 2905-99 G co CCGG 111.180 -999.990 ... V2 2009 05 22 12 01 00 41.8100 -4.9300 850.00 845.00 5.00 275652 CIB 2009 05 11 09 22 00 2906-99 G co CCGG 110.060 -999.990 ... V2 2009 05 22 12 16 00 41.8100 -4.9300 850.00 845.00 5.00 275653 CIB 2009 05 18 09 40 00 2257-99 G co CCGG 134.290 -999.990 ... V2 2009 06 18 12 17 00 41.8100 -4.9300 850.00 845.00 5.00 276705 CIB 2009 05 18 09 40 00 2258-99 G co CCGG 133.880 -999.990 ... V2 2009 06 18 12 32 00 41.8100 -4.9300 850.00 845.00 5.00 276706 CIB 2009 05 25 09 22 00 4091-99 G co CCGG 116.510 -999.990 ... V2 2009 06 18 11 46 00 41.8100 -4.9300 850.00 845.00 5.00 276703 CIB 2009 05 25 09 22 00 4092-99 G co CCGG 116.060 -999.990 ... V2 2009 06 18 12 01 00 41.8100 -4.9300 850.00 845.00 5.00 276704 CIB 2009 06 01 09 06 00 3927-99 G co CCGG 136.510 -999.990 ... V2 2009 07 01 11 41 00 41.8100 -4.9300 850.00 845.00 5.00 277508 CIB 2009 06 01 09 06 00 3928-99 G co CCGG 136.130 -999.990 ... V2 2009 07 01 11 57 00 41.8100 -4.9300 850.00 845.00 5.00 277509 CIB 2009 06 08 09 23 00 2239-99 G co CCGG 111.240 -999.990 ... V2 2009 07 01 11 10 00 41.8100 -4.9300 850.00 845.00 5.00 277506 CIB 2009 06 08 09 23 00 2240-99 G co CCGG 111.110 -999.990 ... V2 2009 07 01 11 26 00 41.8100 -4.9300 850.00 845.00 5.00 277507 CIB 2009 06 15 09 00 00 1311-99 G co CCGG 106.720 -999.990 ... V2 2009 07 10 11 41 00 41.8100 -4.9300 850.00 845.00 5.00 278456 CIB 2009 06 15 09 00 00 1312-99 G co CCGG 106.520 -999.990 ... V2 2009 07 10 11 57 00 41.8100 -4.9300 850.00 845.00 5.00 278457 CIB 2009 06 22 09 05 00 3299-99 G co CCGG 108.890 -999.990 ... V2 2009 07 10 12 12 00 41.8100 -4.9300 850.00 845.00 5.00 278458 CIB 2009 06 22 09 05 00 3300-99 G co CCGG 108.650 -999.990 ... V2 2009 07 10 12 27 00 41.8100 -4.9300 850.00 845.00 5.00 278459 CIB 2009 06 29 09 24 00 529-99 G co CCGG 93.000 -999.990 ... R5 2009 07 21 17 10 00 41.8100 -4.9300 850.00 845.00 5.00 279375 CIB 2009 06 29 09 24 00 530-99 G co CCGG 93.550 -999.990 ... R5 2009 07 21 17 24 00 41.8100 -4.9300 850.00 845.00 5.00 279376 CIB 2009 07 06 09 04 00 4881-99 G co CCGG 97.190 -999.990 ... R5 2009 07 21 16 41 00 41.8100 -4.9300 850.00 845.00 5.00 279373 CIB 2009 07 06 09 04 00 4882-99 G co CCGG 97.420 -999.990 ... R5 2009 07 21 16 55 00 41.8100 -4.9300 850.00 845.00 5.00 279374 CIB 2009 07 13 09 30 00 2553-99 G co CCGG 88.280 -999.990 ... R5 2009 08 04 10 24 00 41.8100 -4.9300 850.00 845.00 5.00 280503 CIB 2009 07 13 09 30 00 2554-99 G co CCGG 87.010 -999.990 ... R5 2009 08 04 10 38 00 41.8100 -4.9300 850.00 845.00 5.00 280504 CIB 2009 07 20 09 37 00 653-99 G co CCGG 102.850 -999.990 ... R5 2009 08 04 11 49 00 41.8100 -4.9300 850.00 845.00 5.00 280501 CIB 2009 07 20 09 37 00 654-99 G co CCGG 103.310 -999.990 ... R5 2009 08 04 12 04 00 41.8100 -4.9300 850.00 845.00 5.00 280502 CIB 2009 07 27 09 50 00 3079-99 G co CCGG 92.200 -999.990 ... R5 2009 08 17 14 25 00 41.8100 -4.9300 850.00 845.00 5.00 281268 CIB 2009 07 27 09 50 00 3080-99 G co CCGG 90.960 -999.990 ... R5 2009 08 17 14 39 00 41.8100 -4.9300 850.00 845.00 5.00 281269 CIB 2009 08 03 09 07 00 963-99 G co CCGG 92.290 -999.990 ... R5 2009 08 17 14 53 00 41.8100 -4.9300 850.00 845.00 5.00 281266 CIB 2009 08 03 09 07 00 964-99 G co CCGG 93.050 -999.990 ... R5 2009 08 17 15 08 00 41.8100 -4.9300 850.00 845.00 5.00 281267 CIB 2009 08 10 09 16 00 4823-99 G co CCGG 99.830 -999.990 ... V2 2009 08 27 16 24 00 41.8100 -4.9300 850.00 845.00 5.00 282141 CIB 2009 08 10 09 16 00 4824-99 G co CCGG 100.100 -999.990 ... V2 2009 08 27 16 39 00 41.8100 -4.9300 850.00 845.00 5.00 282142 CIB 2009 08 17 09 45 00 3869-99 G co CCGG 134.790 -999.990 ... V2 2009 08 27 15 53 00 41.8100 -4.9300 850.00 845.00 5.00 282139 CIB 2009 08 17 09 45 00 3870-99 G co CCGG 134.260 -999.990 ... V2 2009 08 27 16 09 00 41.8100 -4.9300 850.00 845.00 5.00 282140 CIB 2009 08 24 09 45 00 1343-99 G co CCGG 180.320 -999.990 .X. V2 2009 09 08 15 29 00 41.8100 -4.9300 850.00 845.00 5.00 282940 CIB 2009 08 24 09 45 00 1344-99 G co CCGG 182.000 -999.990 .X. V2 2009 09 08 15 44 00 41.8100 -4.9300 850.00 845.00 5.00 282941 CIB 2009 08 31 09 40 00 1389-99 G co CCGG 120.280 -999.990 ... V2 2009 09 08 16 00 00 41.8100 -4.9300 850.00 845.00 5.00 282938 CIB 2009 08 31 09 40 00 1390-99 G co CCGG 120.360 -999.990 ... V2 2009 09 08 16 15 00 41.8100 -4.9300 850.00 845.00 5.00 282939 CIB 2009 09 07 09 15 00 1459-99 G co CCGG 118.640 -999.990 ... R5 2009 09 22 16 47 00 41.8100 -4.9300 850.00 845.00 5.00 283716 CIB 2009 09 07 09 15 00 458-99 G co CCGG 118.700 -999.990 ... R5 2009 09 22 16 32 00 41.8100 -4.9300 850.00 845.00 5.00 283715 CIB 2009 09 14 09 45 00 3666-99 G co CCGG 118.220 -999.990 ... V2 2009 09 22 16 54 00 41.8100 -4.9300 850.00 845.00 5.00 283714 CIB 2009 09 14 09 45 00 528-99 G co CCGG 118.740 -999.990 ... V2 2009 09 22 16 38 00 41.8100 -4.9300 850.00 845.00 5.00 283713 CIB 2009 09 21 09 15 00 2461-99 G co CCGG 105.380 -999.990 ... V2 2009 10 02 11 48 00 41.8100 -4.9300 850.00 845.00 5.00 284402 CIB 2009 09 21 09 15 00 796-99 G co CCGG 104.710 -999.990 ... V2 2009 10 02 11 33 00 41.8100 -4.9300 850.00 845.00 5.00 284401 CIB 2009 09 28 09 12 00 2471-99 G co CCGG 130.640 -999.990 ... V2 2009 10 02 12 35 00 41.8100 -4.9300 850.00 845.00 5.00 284400 CIB 2009 10 05 08 30 00 4427-99 G co CCGG 123.790 -999.990 ... V2 2009 10 22 17 26 00 41.8100 -4.9300 850.00 845.00 5.00 285317 CIB 2009 10 05 08 30 00 4428-99 G co CCGG 123.760 -999.990 ... V2 2009 10 22 17 41 00 41.8100 -4.9300 850.00 845.00 5.00 285318 CIB 2009 10 13 08 30 00 3919-99 G co CCGG 113.820 -999.990 ... V2 2009 10 22 16 55 00 41.8100 -4.9300 850.00 845.00 5.00 285319 CIB 2009 10 13 08 30 00 3920-99 G co CCGG 114.190 -999.990 ... V2 2009 10 22 17 10 00 41.8100 -4.9300 850.00 845.00 5.00 285320 CIB 2009 10 19 09 05 00 3019-99 G co CCGG 128.060 -999.990 ... V2 2009 11 16 11 20 00 41.8100 -4.9300 850.00 845.00 5.00 285879 CIB 2009 10 19 09 05 00 3020-99 G co CCGG 128.670 -999.990 ... V2 2009 11 16 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 285880 CIB 2009 10 26 10 20 00 1439-99 G co CCGG 95.850 -999.990 ... V2 2009 11 16 10 49 00 41.8100 -4.9300 850.00 845.00 5.00 285877 CIB 2009 10 26 10 20 00 1440-99 G co CCGG 95.830 -999.990 ... V2 2009 11 16 11 05 00 41.8100 -4.9300 850.00 845.00 5.00 285878 CIB 2009 11 03 10 20 00 1513-99 G co CCGG 105.040 -999.990 ... V2 2009 11 23 13 39 00 41.8100 -4.9300 850.00 845.00 5.00 286646 CIB 2009 11 03 10 20 00 1740-99 G co CCGG 104.290 -999.990 ... V2 2009 11 23 13 54 00 41.8100 -4.9300 850.00 845.00 5.00 286647 CIB 2009 11 09 09 15 00 1497-99 G co CCGG 116.570 -999.990 ... V2 2009 11 23 14 09 00 41.8100 -4.9300 850.00 845.00 5.00 286644 CIB 2009 11 09 09 15 00 2981-99 G co CCGG 116.090 -999.990 ... V2 2009 11 23 14 25 00 41.8100 -4.9300 850.00 845.00 5.00 286645 CIB 2009 11 16 09 10 00 3424-99 G co CCGG 82.070 -999.990 .X. V2 2009 12 12 17 27 00 41.8100 -4.9300 850.00 845.00 5.00 287589 CIB 2009 11 16 09 10 00 669-99 G co CCGG 81.950 -999.990 .X. V2 2009 12 12 17 11 00 41.8100 -4.9300 850.00 845.00 5.00 287588 CIB 2009 11 23 10 10 00 299-99 G co CCGG 123.880 -999.990 ... V2 2009 12 12 16 41 00 41.8100 -4.9300 850.00 845.00 5.00 287590 CIB 2009 11 23 10 10 00 3244-99 G co CCGG 124.040 -999.990 ... V2 2009 12 12 16 56 00 41.8100 -4.9300 850.00 845.00 5.00 287591 CIB 2009 11 30 10 40 00 4065-99 G co CCGG 121.390 -999.990 ... V2 2010 02 04 14 36 00 41.8100 -4.9300 850.00 845.00 5.00 289447 CIB 2009 11 30 10 40 00 4066-99 G co CCGG 121.450 -999.990 ... V2 2010 02 04 14 52 00 41.8100 -4.9300 850.00 845.00 5.00 289448 CIB 2009 12 09 10 30 00 4105-99 G co CCGG 134.740 -999.990 .N. V2 2010 02 23 10 49 00 41.8100 -4.9300 850.00 845.00 5.00 289968 CIB 2009 12 09 12 50 00 379-99 G co CCGG 120.050 -999.990 ... V2 2010 01 19 11 01 00 41.8100 -4.9300 850.00 845.00 5.00 288505 CIB 2009 12 09 12 50 00 380-99 G co CCGG 119.470 -999.990 ... V2 2010 01 19 11 16 00 41.8100 -4.9300 850.00 845.00 5.00 288506 CIB 2009 12 14 10 50 00 349-99 G co CCGG 169.650 -999.990 .X. V2 2010 01 19 13 34 00 41.8100 -4.9300 847.00 845.00 2.00 288513 CIB 2009 12 14 10 50 00 350-99 G co CCGG 169.410 -999.990 .X. V2 2010 01 19 13 49 00 41.8100 -4.9300 847.00 845.00 2.00 288514 CIB 2010 01 04 10 15 00 297-99 G co CCGG 127.640 -999.990 ... V2 2010 02 04 14 06 00 41.8100 -4.9300 850.00 845.00 5.00 289449 CIB 2010 01 04 10 15 00 298-99 G co CCGG 127.020 -999.990 ... V2 2010 02 04 14 21 00 41.8100 -4.9300 850.00 845.00 5.00 289450 CIB 2010 01 18 10 20 00 2995-99 G co CCGG 124.350 -999.990 ... V2 2010 02 16 14 37 00 41.8100 -4.9300 850.00 845.00 5.00 289966 CIB 2010 01 18 10 20 00 2996-99 G co CCGG 123.670 -999.990 ... V2 2010 02 16 14 53 00 41.8100 -4.9300 850.00 845.00 5.00 289967 CIB 2010 01 25 10 50 00 3563-99 G co CCGG 136.410 -999.990 ... V2 2010 03 02 09 43 00 41.8100 -4.9300 850.00 845.00 5.00 290787 CIB 2010 01 25 10 50 00 3665-99 G co CCGG 136.500 -999.990 ... V2 2010 03 02 09 28 00 41.8100 -4.9300 850.00 845.00 5.00 290786 CIB 2010 02 01 09 05 00 2349-99 G co CCGG 132.460 -999.990 ... V2 2010 03 03 15 47 00 41.8100 -4.9300 850.00 845.00 5.00 290789 CIB 2010 02 01 09 05 00 54-99 G co CCGG 133.940 -999.990 ... V2 2010 03 03 15 32 00 41.8100 -4.9300 850.00 845.00 5.00 290788 CIB 2010 02 08 09 10 00 3392-99 G co CCGG 141.870 -999.990 ... V2 2010 03 15 11 07 00 41.8100 -4.9300 850.00 845.00 5.00 291641 CIB 2010 02 08 09 10 00 4485-99 G co CCGG 141.480 -999.990 ... V2 2010 03 15 11 23 00 41.8100 -4.9300 850.00 845.00 5.00 291642 CIB 2010 02 15 10 00 00 3277-99 G co CCGG 197.200 -999.990 .X. V2 2010 03 12 14 27 00 41.8100 -4.9300 850.00 845.00 5.00 291643 CIB 2010 02 15 10 00 00 3345-99 G co CCGG 197.500 -999.990 .X. V2 2010 03 12 14 43 00 41.8100 -4.9300 850.00 845.00 5.00 291644 CIB 2010 02 22 09 15 00 4779-99 G co CCGG 138.410 -999.990 ... V2 2010 03 26 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 292319 CIB 2010 02 22 09 15 00 4780-99 G co CCGG 138.460 -999.990 ... V2 2010 03 26 13 16 00 41.8100 -4.9300 850.00 845.00 5.00 292320 CIB 2010 03 01 09 15 00 2967-99 G co CCGG 142.230 -999.990 ... V2 2010 03 26 12 30 00 41.8100 -4.9300 850.00 845.00 5.00 292317 CIB 2010 03 01 09 15 00 2968-99 G co CCGG 142.570 -999.990 ... V2 2010 03 26 12 46 00 41.8100 -4.9300 850.00 845.00 5.00 292318 CIB 2010 03 08 10 30 00 2113-99 G co CCGG 183.030 -999.990 ... V2 2010 04 07 13 48 00 41.8100 -4.9300 850.00 845.00 5.00 293280 CIB 2010 03 08 10 30 00 2114-99 G co CCGG 182.800 -999.990 ... V2 2010 04 07 14 03 00 41.8100 -4.9300 850.00 845.00 5.00 293281 CIB 2010 03 15 10 45 00 4205-99 G co CCGG 159.090 -999.990 ... V2 2010 04 06 15 43 00 41.8100 -4.9300 850.00 845.00 5.00 293278 CIB 2010 03 15 10 45 00 4206-99 G co CCGG 159.530 -999.990 ... V2 2010 04 06 15 58 00 41.8100 -4.9300 850.00 845.00 5.00 293279 CIB 2010 03 22 09 40 00 2744-99 G co CCGG 153.970 -999.990 ... R5 2010 04 13 13 38 00 41.8100 -4.9300 850.00 845.00 5.00 293829 CIB 2010 03 22 09 40 00 2969-99 G co CCGG 153.740 -999.990 ... R5 2010 04 13 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 293830 CIB 2010 03 29 08 20 00 1003-99 G co CCGG 152.680 -999.990 ... R5 2010 04 13 13 07 00 41.8100 -4.9300 850.00 845.00 5.00 293831 CIB 2010 03 29 08 20 00 2903-99 G co CCGG 152.680 -999.990 ... R5 2010 04 13 13 22 00 41.8100 -4.9300 850.00 845.00 5.00 293832 CIB 2010 04 05 10 30 00 3645-99 G co CCGG 153.860 -999.990 ... V2 2010 04 20 15 33 00 41.8100 -4.9300 850.00 845.00 5.00 294900 CIB 2010 04 05 10 30 00 3646-99 G co CCGG 153.490 -999.990 ... V2 2010 04 20 15 48 00 41.8100 -4.9300 850.00 845.00 5.00 294901 CIB 2010 04 12 10 00 00 4981-99 G co CCGG 171.670 -999.990 ... R5 2010 04 20 14 47 00 41.8100 -4.9300 850.00 845.00 5.00 294902 CIB 2010 04 12 10 00 00 4982-99 G co CCGG 171.670 -999.990 ... R5 2010 04 20 15 01 00 41.8100 -4.9300 850.00 845.00 5.00 294903 CIB 2010 04 19 10 05 00 4909-99 G co CCGG 146.050 -999.990 ... R5 2010 05 11 15 23 00 41.8100 -4.9300 850.00 845.00 5.00 295934 CIB 2010 04 19 10 05 00 4910-99 G co CCGG 146.240 -999.990 ... R5 2010 05 11 15 38 00 41.8100 -4.9300 850.00 845.00 5.00 295935 CIB 2010 04 26 09 30 00 2155-99 G co CCGG 139.610 -999.990 ... R5 2010 05 11 14 54 00 41.8100 -4.9300 850.00 845.00 5.00 295936 CIB 2010 04 26 09 30 00 2156-99 G co CCGG 139.520 -999.990 ... R5 2010 05 11 15 09 00 41.8100 -4.9300 850.00 845.00 5.00 295937 CIB 2010 05 03 09 00 00 1329-99 G co CCGG 136.300 -999.990 ... R5 2010 05 25 09 02 00 41.8100 -4.9300 850.00 845.00 5.00 296707 CIB 2010 05 03 09 00 00 1330-99 G co CCGG 136.160 -999.990 ... R5 2010 05 25 09 16 00 41.8100 -4.9300 850.00 845.00 5.00 296708 CIB 2010 05 10 09 45 00 495-99 G co CCGG 132.190 -999.990 ... R5 2010 05 25 09 31 00 41.8100 -4.9300 850.00 845.00 5.00 296705 CIB 2010 05 10 09 45 00 496-99 G co CCGG 132.220 -999.990 ... R5 2010 05 25 09 46 00 41.8100 -4.9300 850.00 845.00 5.00 296706 CIB 2010 05 18 11 30 00 4213-99 G co CCGG 122.790 -999.990 ... V2 2010 06 03 12 42 00 41.8100 -4.9300 850.00 845.00 5.00 297401 CIB 2010 05 18 11 30 00 5046-99 G co CCGG 123.040 -999.990 ... V2 2010 06 03 12 57 00 41.8100 -4.9300 850.00 845.00 5.00 297402 CIB 2010 05 24 09 00 00 1574-99 G co CCGG 129.360 -999.990 ... V2 2010 06 03 12 11 00 41.8100 -4.9300 850.00 845.00 5.00 297399 CIB 2010 05 24 09 00 00 4077-99 G co CCGG 128.480 -999.990 ... V2 2010 06 03 12 26 00 41.8100 -4.9300 850.00 845.00 5.00 297400 CIB 2010 05 31 10 33 00 3321-99 G co CCGG 97.220 -999.990 ... R5 2010 06 15 12 47 00 41.8100 -4.9300 850.00 845.00 5.00 298358 CIB 2010 05 31 10 33 00 3322-99 G co CCGG 97.080 -999.990 ... R5 2010 06 15 13 02 00 41.8100 -4.9300 850.00 845.00 5.00 298359 CIB 2010 06 07 09 05 00 4181-99 G co CCGG 119.600 -999.990 ... R5 2010 06 15 12 18 00 41.8100 -4.9300 850.00 845.00 5.00 298360 CIB 2010 06 07 09 05 00 4182-99 G co CCGG 119.370 -999.990 ... R5 2010 06 15 12 33 00 41.8100 -4.9300 850.00 845.00 5.00 298361 CIB 2010 06 14 10 20 00 4220-99 G co CCGG 117.750 -999.990 ... R5 2010 06 29 09 07 00 41.8100 -4.9300 850.00 845.00 5.00 299135 CIB 2010 06 14 10 20 00 4429-99 G co CCGG 117.910 -999.990 ... R5 2010 06 29 09 22 00 41.8100 -4.9300 850.00 845.00 5.00 299136 CIB 2010 06 21 09 20 00 377-99 G co CCGG 112.110 -999.990 ... R5 2010 06 29 09 37 00 41.8100 -4.9300 850.00 845.00 5.00 299137 CIB 2010 06 21 09 20 00 4673-99 G co CCGG 112.010 -999.990 ... R5 2010 06 29 09 51 00 41.8100 -4.9300 850.00 845.00 5.00 299138 CIB 2010 06 28 09 20 00 3135-99 G co CCGG 126.060 -999.990 ... V2 2010 07 12 14 02 00 41.8100 -4.9300 850.00 845.00 5.00 299887 CIB 2010 06 28 09 20 00 3136-99 G co CCGG 125.900 -999.990 ... V2 2010 07 12 14 17 00 41.8100 -4.9300 850.00 845.00 5.00 299888 CIB 2010 07 02 09 00 00 3885-99 G co CCGG 140.870 -999.990 ... V2 2010 07 12 13 26 00 41.8100 -4.9300 850.00 845.00 5.00 299889 CIB 2010 07 02 09 00 00 3886-99 G co CCGG 141.220 -999.990 ... V2 2010 07 12 13 42 00 41.8100 -4.9300 850.00 845.00 5.00 299890 CIB 2010 07 12 10 35 00 1008-99 G co CCGG 105.230 -999.990 ... R5 2010 07 30 13 51 00 41.8100 -4.9300 850.00 845.00 5.00 300978 CIB 2010 07 12 10 35 00 4957-99 G co CCGG 104.640 -999.990 ... R5 2010 07 30 14 06 00 41.8100 -4.9300 850.00 845.00 5.00 300979 CIB 2010 07 19 09 00 00 1336-99 G co CCGG 114.650 -999.990 ... R5 2010 07 30 13 22 00 41.8100 -4.9300 850.00 845.00 5.00 300980 CIB 2010 07 19 09 00 00 6072-66 G co CCGG 114.620 -999.990 ... R5 2010 07 30 13 36 00 41.8100 -4.9300 850.00 845.00 5.00 300981 CIB 2010 07 26 09 17 00 5201-99 G co CCGG 104.290 -999.990 ... V2 2010 08 09 13 36 00 41.8100 -4.9300 850.00 845.00 5.00 301526 CIB 2010 07 26 09 17 00 5202-99 G co CCGG 105.030 -999.990 ... V2 2010 08 09 13 52 00 41.8100 -4.9300 850.00 845.00 5.00 301527 CIB 2010 08 02 09 10 00 5207-99 G co CCGG 99.330 -999.990 ... V2 2010 08 09 13 06 00 41.8100 -4.9300 850.00 845.00 5.00 301528 CIB 2010 08 02 09 10 00 5208-99 G co CCGG 98.580 -999.990 ... V2 2010 08 09 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 301529 CIB 2010 08 09 09 16 00 39-99 G co CCGG 376.480 -999.990 .XC R5 2010 08 25 11 15 00 41.8100 -4.9300 850.00 845.00 5.00 302495 CIB 2010 08 09 09 16 00 40-99 G co CCGG 378.890 -999.990 .XC R5 2010 08 25 11 30 00 41.8100 -4.9300 850.00 845.00 5.00 302496 CIB 2010 08 17 09 30 00 2003-99 G co CCGG 124.910 -999.990 ... R5 2010 08 25 10 45 00 41.8100 -4.9300 850.00 845.00 5.00 302497 CIB 2010 08 17 09 30 00 2004-99 G co CCGG 125.480 -999.990 ... R5 2010 08 25 11 00 00 41.8100 -4.9300 850.00 845.00 5.00 302498 CIB 2010 08 23 09 35 00 703-99 G co CCGG 93.360 -999.990 ... V2 2010 09 07 11 22 00 41.8100 -4.9300 850.00 845.00 5.00 303175 CIB 2010 08 23 09 35 00 704-99 G co CCGG 93.290 -999.990 ... V2 2010 09 07 11 37 00 41.8100 -4.9300 850.00 845.00 5.00 303176 CIB 2010 08 30 09 24 00 4389-99 G co CCGG 119.950 -999.990 ... V2 2010 09 07 11 52 00 41.8100 -4.9300 850.00 845.00 5.00 303173 CIB 2010 08 30 09 24 00 4390-99 G co CCGG 119.050 -999.990 ... V2 2010 09 07 12 07 00 41.8100 -4.9300 850.00 845.00 5.00 303174 CIB 2010 09 06 09 06 00 156-99 G co CCGG 138.920 -999.990 ... V2 2010 09 22 14 22 00 41.8100 -4.9300 850.00 845.00 5.00 304083 CIB 2010 09 06 09 06 00 2383-99 G co CCGG 137.700 -999.990 ... V2 2010 09 22 14 07 00 41.8100 -4.9300 850.00 845.00 5.00 304084 CIB 2010 09 13 08 47 00 3437-99 G co CCGG 116.100 -999.990 ... V2 2010 09 22 14 38 00 41.8100 -4.9300 850.00 845.00 5.00 304081 CIB 2010 09 13 08 47 00 3466-99 G co CCGG 116.120 -999.990 ... V2 2010 09 22 14 53 00 41.8100 -4.9300 850.00 845.00 5.00 304082 CIB 2010 09 20 09 52 00 2939-99 G co CCGG 113.440 -999.990 ... R5 2010 10 06 13 54 00 41.8100 -4.9300 850.00 845.00 5.00 304988 CIB 2010 09 20 09 52 00 4905-99 G co CCGG 112.640 -999.990 ... R5 2010 10 06 14 08 00 41.8100 -4.9300 850.00 845.00 5.00 304989 CIB 2010 09 27 10 00 00 2844-99 G co CCGG 111.480 -999.990 ... V2 2010 10 06 15 08 00 41.8100 -4.9300 850.00 845.00 5.00 304987 CIB 2010 09 27 10 00 00 869-99 G co CCGG 110.460 -999.990 ... V2 2010 10 06 14 53 00 41.8100 -4.9300 850.00 845.00 5.00 304986 CIB 2010 10 04 11 00 00 5073-99 G co CCGG 107.690 -999.990 ... V2 2010 10 21 10 40 00 41.8100 -4.9300 850.00 845.00 5.00 305831 CIB 2010 10 04 11 00 00 5074-99 G co CCGG 107.020 -999.990 ... V2 2010 10 21 10 55 00 41.8100 -4.9300 850.00 845.00 5.00 305832 CIB 2010 10 08 10 15 00 5173-99 G co CCGG 110.920 -999.990 ... V2 2010 10 21 10 09 00 41.8100 -4.9300 850.00 845.00 5.00 305833 CIB 2010 10 08 10 15 00 5174-99 G co CCGG 110.710 -999.990 ... V2 2010 10 21 10 24 00 41.8100 -4.9300 850.00 845.00 5.00 305834 CIB 2010 10 18 10 20 00 2123-99 G co CCGG 118.520 -999.990 ... R5 2010 11 11 14 06 00 41.8100 -4.9300 850.00 845.00 5.00 307117 CIB 2010 10 18 10 20 00 2124-99 G co CCGG 118.710 -999.990 ... R5 2010 11 11 14 21 00 41.8100 -4.9300 850.00 845.00 5.00 307118 CIB 2010 10 27 10 00 00 5183-99 G co CCGG 146.010 -999.990 ... R5 2010 11 11 14 36 00 41.8100 -4.9300 850.00 845.00 5.00 307119 CIB 2010 10 27 10 00 00 5184-99 G co CCGG 143.670 -999.990 ... R5 2010 11 11 14 51 00 41.8100 -4.9300 850.00 845.00 5.00 307120 CIB 2010 11 02 10 10 00 2739-99 G co CCGG 119.880 -999.990 ... V2 2010 11 17 11 54 00 41.8100 -4.9300 850.00 845.00 5.00 307786 CIB 2010 11 02 10 10 00 2740-99 G co CCGG 119.760 -999.990 ... V2 2010 11 17 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 307787 CIB 2010 11 08 11 00 00 2041-99 G co CCGG 118.300 -999.990 ... V2 2010 11 17 12 24 00 41.8100 -4.9300 850.00 845.00 5.00 307784 CIB 2010 11 08 11 00 00 2042-99 G co CCGG 117.980 -999.990 ... V2 2010 11 17 12 40 00 41.8100 -4.9300 850.00 845.00 5.00 307785 CIB 2010 11 15 11 40 00 1386-99 G co CCGG 122.450 -999.990 ... R5 2010 12 07 15 17 00 41.8100 -4.9300 850.00 845.00 5.00 308452 CIB 2010 11 15 11 40 00 2914-99 G co CCGG 122.210 -999.990 ... R5 2010 12 07 15 32 00 41.8100 -4.9300 850.00 845.00 5.00 308453 CIB 2010 11 22 10 40 00 3609-99 G co CCGG 121.700 -999.990 ... R5 2010 12 08 09 49 00 41.8100 -4.9300 850.00 845.00 5.00 308451 CIB 2010 11 22 10 40 00 3785-99 G co CCGG 121.280 -999.990 ... R5 2010 12 08 09 34 00 41.8100 -4.9300 850.00 845.00 5.00 308450 CIB 2010 11 29 10 15 00 2707-99 G co CCGG 136.280 -999.990 ... R5 2010 12 20 15 48 00 41.8100 -4.9300 850.00 845.00 5.00 309549 CIB 2010 11 29 10 15 00 2708-99 G co CCGG 135.750 -999.990 ... R5 2010 12 20 16 02 00 41.8100 -4.9300 850.00 845.00 5.00 309550 CIB 2010 12 09 11 05 00 6203-66 G co CCGG 157.840 -999.990 ... R5 2010 12 20 15 18 00 41.8100 -4.9300 850.00 845.00 5.00 309547 CIB 2010 12 09 11 05 00 6204-66 G co CCGG 157.470 -999.990 ... R5 2010 12 20 15 33 00 41.8100 -4.9300 850.00 845.00 5.00 309548 CIB 2010 12 14 11 05 00 1656-99 G co CCGG 136.040 -999.990 ... V2 2011 01 05 15 22 00 41.8100 -4.9300 850.00 845.00 5.00 310363 CIB 2010 12 14 11 05 00 970-99 G co CCGG 135.910 -999.990 ... V2 2011 01 05 15 06 00 41.8100 -4.9300 850.00 845.00 5.00 310362 CIB 2010 12 20 10 20 00 2422-99 G co CCGG 129.350 -999.990 ... V2 2011 01 05 15 38 00 41.8100 -4.9300 850.00 845.00 5.00 310364 CIB 2010 12 20 10 20 00 4403-99 G co CCGG 129.640 -999.990 ... V2 2011 01 05 15 55 00 41.8100 -4.9300 850.00 845.00 5.00 310365 CIB 2010 12 27 11 10 00 2313-99 G co CCGG 188.070 -999.990 .X. V2 2011 01 20 12 03 00 41.8100 -4.9300 850.00 845.00 5.00 311090 CIB 2010 12 27 11 10 00 2314-99 G co CCGG 186.990 -999.990 .X. V2 2011 01 20 12 19 00 41.8100 -4.9300 850.00 845.00 5.00 311091 CIB 2011 01 03 10 04 00 321-99 G co CCGG 147.370 -999.990 ... V2 2011 01 20 11 30 00 41.8100 -4.9300 850.00 845.00 5.00 311092 CIB 2011 01 03 10 04 00 322-99 G co CCGG 148.090 -999.990 ... V2 2011 01 20 11 46 00 41.8100 -4.9300 850.00 845.00 5.00 311093 CIB 2011 01 10 09 50 00 1508-99 G co CCGG 154.410 -999.990 ... V2 2011 01 28 16 37 00 41.8100 -4.9300 850.00 845.00 5.00 311633 CIB 2011 01 10 09 50 00 4495-99 G co CCGG 154.480 -999.990 ... V2 2011 01 28 16 53 00 41.8100 -4.9300 850.00 845.00 5.00 311634 CIB 2011 01 17 10 36 00 227-99 G co CCGG 140.810 -999.990 ... V2 2011 01 28 16 04 00 41.8100 -4.9300 850.00 845.00 5.00 311635 CIB 2011 01 17 10 36 00 893-99 G co CCGG 140.930 -999.990 ... V2 2011 01 28 16 20 00 41.8100 -4.9300 850.00 845.00 5.00 311636 CIB 2011 01 24 10 34 00 5397-99 G co CCGG 166.460 -999.990 ... V2 2011 02 16 12 59 00 41.8100 -4.9300 850.00 845.00 5.00 312519 CIB 2011 01 24 10 34 00 5398-99 G co CCGG 166.730 -999.990 ... V2 2011 02 16 13 15 00 41.8100 -4.9300 850.00 845.00 5.00 312520 CIB 2011 01 31 11 50 00 5395-99 G co CCGG 174.760 -999.990 ... V2 2011 02 16 12 26 00 41.8100 -4.9300 850.00 845.00 5.00 312517 CIB 2011 01 31 11 50 00 5396-99 G co CCGG 175.300 -999.990 ... V2 2011 02 16 12 43 00 41.8100 -4.9300 850.00 845.00 5.00 312518 CIB 2011 02 07 10 45 00 4061-99 G co CCGG 160.510 -999.990 ... V4 2011 03 01 13 45 00 41.8100 -4.9300 850.00 845.00 5.00 313144 CIB 2011 02 07 10 45 00 4062-99 G co CCGG 159.830 -999.990 ... V4 2011 03 01 14 00 00 41.8100 -4.9300 850.00 845.00 5.00 313145 CIB 2011 02 14 10 17 00 1221-99 G co CCGG 145.960 -999.990 ... V4 2011 02 28 16 57 00 41.8100 -4.9300 850.00 845.00 5.00 313146 CIB 2011 02 14 10 17 00 1222-99 G co CCGG 146.070 -999.990 ... V4 2011 02 28 17 12 00 41.8100 -4.9300 850.00 845.00 5.00 313147 CIB 2011 02 21 10 02 00 1711-99 G co CCGG 145.610 -999.990 ... V2 2011 03 09 12 25 00 41.8100 -4.9300 850.00 845.00 5.00 313833 CIB 2011 02 21 10 02 00 2561-99 G co CCGG 145.670 -999.990 ... V2 2011 03 09 12 41 00 41.8100 -4.9300 850.00 845.00 5.00 313834 CIB 2011 02 28 10 30 00 3295-99 G co CCGG 145.920 -999.990 ... V2 2011 03 09 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 313836 CIB 2011 02 28 10 30 00 410-99 G co CCGG 145.930 -999.990 ... V2 2011 03 09 11 52 00 41.8100 -4.9300 850.00 845.00 5.00 313835 CIB 2011 03 07 10 05 00 1769-99 G co CCGG 180.340 -999.990 ... V2 2011 03 23 13 55 00 41.8100 -4.9300 850.00 845.00 5.00 314629 CIB 2011 03 07 10 05 00 3200-99 G co CCGG 179.600 -999.990 ... V2 2011 03 23 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 314630 CIB 2011 03 15 10 12 00 2646-99 G co CCGG 145.080 -999.990 ... V2 2011 03 23 14 28 00 41.8100 -4.9300 850.00 845.00 5.00 314627 CIB 2011 03 15 10 12 00 3790-99 G co CCGG 144.800 -999.990 ... V2 2011 03 23 14 44 00 41.8100 -4.9300 850.00 845.00 5.00 314628 CIB 2011 03 21 10 15 00 4499-99 G co CCGG 159.170 -999.990 ... V2 2011 04 07 13 47 00 41.8100 -4.9300 850.00 845.00 5.00 315319 CIB 2011 03 21 10 15 00 4500-99 G co CCGG 157.900 -999.990 ... V2 2011 04 07 14 04 00 41.8100 -4.9300 850.00 845.00 5.00 315320 CIB 2011 03 28 09 17 00 5401-99 G co CCGG 140.870 -999.990 ... V2 2011 04 07 14 20 00 41.8100 -4.9300 850.00 845.00 5.00 315321 CIB 2011 03 28 09 17 00 5402-99 G co CCGG 140.260 -999.990 ... V2 2011 04 07 14 36 00 41.8100 -4.9300 850.00 845.00 5.00 315322 CIB 2011 04 04 08 30 00 39-99 G co CCGG 147.090 -999.990 ... V4 2011 04 19 14 08 00 41.8100 -4.9300 850.00 845.00 5.00 315996 CIB 2011 04 04 08 30 00 40-99 G co CCGG 147.780 -999.990 ... V4 2011 04 19 14 24 00 41.8100 -4.9300 850.00 845.00 5.00 315997 CIB 2011 04 11 09 00 00 2419-99 G co CCGG 129.810 -999.990 ... V4 2011 04 19 13 38 00 41.8100 -4.9300 850.00 845.00 5.00 315994 CIB 2011 04 11 09 00 00 2420-99 G co CCGG 129.440 -999.990 ... V4 2011 04 19 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 315995 CIB 2011 04 20 10 10 00 2073-99 G co CCGG 127.560 -999.990 ... V4 2011 05 04 10 18 00 41.8100 -4.9300 850.00 845.00 5.00 317078 CIB 2011 04 20 10 10 00 2074-99 G co CCGG 127.450 -999.990 ... V4 2011 05 04 10 34 00 41.8100 -4.9300 850.00 845.00 5.00 317079 CIB 2011 04 25 09 03 00 3653-99 G co CCGG 148.640 -999.990 ... V4 2011 05 03 17 13 00 41.8100 -4.9300 850.00 845.00 5.00 317076 CIB 2011 04 25 09 03 00 3654-99 G co CCGG 148.200 -999.990 ... V4 2011 05 03 17 28 00 41.8100 -4.9300 850.00 845.00 5.00 317077 CIB 2011 05 02 09 12 00 745-99 G co CCGG 129.050 -999.990 ... V2 2011 05 16 14 59 00 41.8100 -4.9300 850.00 845.00 5.00 317660 CIB 2011 05 02 09 12 00 948-99 G co CCGG 129.310 -999.990 ... V2 2011 05 16 14 43 00 41.8100 -4.9300 850.00 845.00 5.00 317659 CIB 2011 05 09 09 06 00 4216-99 G co CCGG 130.080 -999.990 ... V2 2011 05 16 15 31 00 41.8100 -4.9300 850.00 845.00 5.00 317658 CIB 2011 05 09 09 06 00 54-99 G co CCGG 130.500 -999.990 ... V2 2011 05 16 15 15 00 41.8100 -4.9300 850.00 845.00 5.00 317657 CIB 2011 05 16 09 20 00 4625-99 G co CCGG 121.390 -999.990 ... V4 2011 06 03 16 41 00 41.8100 -4.9300 850.00 845.00 5.00 318532 CIB 2011 05 16 09 20 00 4626-99 G co CCGG 120.790 -999.990 ... V4 2011 06 03 16 56 00 41.8100 -4.9300 850.00 845.00 5.00 318533 CIB 2011 05 23 09 20 00 3149-99 G co CCGG 114.860 -999.990 ... V4 2011 06 06 11 17 00 41.8100 -4.9300 850.00 845.00 5.00 318530 CIB 2011 05 23 09 20 00 3150-99 G co CCGG 115.500 -999.990 ... V4 2011 06 06 11 33 00 41.8100 -4.9300 850.00 845.00 5.00 318531 CIB 2011 05 30 09 30 00 4667-99 G co CCGG 100.410 -999.990 ... V4 2011 06 13 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 319032 CIB 2011 05 30 09 30 00 4668-99 G co CCGG 100.210 -999.990 ... V4 2011 06 13 11 51 00 41.8100 -4.9300 850.00 845.00 5.00 319033 CIB 2011 06 06 09 45 00 3757-99 G co CCGG 115.770 -999.990 ... V4 2011 06 10 11 40 00 41.8100 -4.9300 850.00 845.00 5.00 319024 CIB 2011 06 06 09 45 00 3758-99 G co CCGG 115.040 -999.990 ... V4 2011 06 10 11 55 00 41.8100 -4.9300 850.00 845.00 5.00 319025 CIB 2011 06 13 09 20 00 107-99 G co CCGG 99.010 -999.990 ... V4 2011 07 12 16 19 00 41.8100 -4.9300 850.00 845.00 5.00 320342 CIB 2011 06 13 09 20 00 1211-99 G co CCGG 99.260 -999.990 ... V4 2011 07 12 16 34 00 41.8100 -4.9300 850.00 845.00 5.00 320343 CIB 2011 06 20 08 55 00 2006-99 G co CCGG 109.930 -999.990 ... V4 2011 07 12 15 49 00 41.8100 -4.9300 850.00 845.00 5.00 320340 CIB 2011 06 20 08 55 00 4193-99 G co CCGG 109.570 -999.990 ... V4 2011 07 12 16 04 00 41.8100 -4.9300 850.00 845.00 5.00 320341 CIB 2011 06 27 09 58 00 4519-99 G co CCGG 125.320 -999.990 ... V4 2011 07 12 15 18 00 41.8100 -4.9300 850.00 845.00 5.00 320338 CIB 2011 06 27 09 58 00 4520-99 G co CCGG 124.370 -999.990 ... V4 2011 07 12 15 33 00 41.8100 -4.9300 850.00 845.00 5.00 320339 CIB 2011 07 04 09 05 00 5209-99 G co CCGG 125.970 -999.990 ... V4 2011 07 12 14 48 00 41.8100 -4.9300 850.00 845.00 5.00 320336 CIB 2011 07 04 09 05 00 5210-99 G co CCGG 125.640 -999.990 ... V4 2011 07 12 15 03 00 41.8100 -4.9300 850.00 845.00 5.00 320337 CIB 2011 07 12 09 50 00 2123-99 G co CCGG 122.780 -999.990 ... V2 2011 08 03 15 38 00 41.8100 -4.9300 850.00 845.00 5.00 321454 CIB 2011 07 12 09 50 00 2124-99 G co CCGG 122.720 -999.990 ... V2 2011 08 03 15 54 00 41.8100 -4.9300 850.00 845.00 5.00 321455 CIB 2011 07 19 09 30 00 2659-99 G co CCGG 99.610 -999.990 ... V2 2011 08 03 15 06 00 41.8100 -4.9300 850.00 845.00 5.00 321456 CIB 2011 07 19 09 30 00 2660-99 G co CCGG 99.330 -999.990 ... V2 2011 08 03 15 22 00 41.8100 -4.9300 850.00 845.00 5.00 321457 CIB 2011 07 26 09 10 00 2669-99 G co CCGG 105.710 -999.990 ... V2 2011 08 15 13 07 00 41.8100 -4.9300 850.00 845.00 5.00 322040 CIB 2011 07 26 09 10 00 2670-99 G co CCGG 105.510 -999.990 ... V2 2011 08 15 13 23 00 41.8100 -4.9300 850.00 845.00 5.00 322041 CIB 2011 08 01 09 35 00 3357-99 G co CCGG 158.570 -999.990 .X. V2 2011 08 15 13 39 00 41.8100 -4.9300 850.00 845.00 5.00 322038 CIB 2011 08 01 09 35 00 3358-99 G co CCGG 158.120 -999.990 .X. V2 2011 08 15 13 56 00 41.8100 -4.9300 850.00 845.00 5.00 322039 CIB 2011 08 08 10 00 00 6035-66 G co CCGG 99.720 -999.990 ... V2 2011 08 23 15 55 00 41.8100 -4.9300 850.00 845.00 5.00 322589 CIB 2011 08 08 10 00 00 6036-66 G co CCGG 99.170 -999.990 ... V2 2011 08 23 16 11 00 41.8100 -4.9300 850.00 845.00 5.00 322590 CIB 2011 08 16 09 00 00 3985-99 G co CCGG 100.980 -999.990 ... V2 2011 08 23 16 28 00 41.8100 -4.9300 850.00 845.00 5.00 322587 CIB 2011 08 16 09 00 00 3986-99 G co CCGG 101.580 -999.990 ... V2 2011 08 23 16 44 00 41.8100 -4.9300 850.00 845.00 5.00 322588 CIB 2011 08 23 09 35 00 533-99 G co CCGG 104.780 -999.990 ... V4 2011 09 13 13 52 00 41.8100 -4.9300 850.00 845.00 5.00 323325 CIB 2011 08 23 09 35 00 534-99 G co CCGG 105.350 -999.990 ... V4 2011 09 13 14 07 00 41.8100 -4.9300 850.00 845.00 5.00 323326 CIB 2011 08 29 10 12 00 3463-99 G co CCGG 114.120 -999.990 ... V4 2011 09 13 12 51 00 41.8100 -4.9300 850.00 845.00 5.00 323323 CIB 2011 08 29 10 12 00 3464-99 G co CCGG 115.350 -999.990 ... V4 2011 09 13 13 06 00 41.8100 -4.9300 850.00 845.00 5.00 323324 CIB 2011 09 05 08 35 00 3333-99 G co CCGG 100.210 -999.990 ... V4 2011 09 30 12 40 00 41.8100 -4.9300 850.00 845.00 5.00 324345 CIB 2011 09 05 08 35 00 3334-99 G co CCGG 100.570 -999.990 ... V4 2011 09 30 12 55 00 41.8100 -4.9300 850.00 845.00 5.00 324346 CIB 2011 09 13 08 47 00 3217-99 G co CCGG 98.400 -999.990 ... V4 2011 09 30 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 324347 CIB 2011 09 13 08 47 00 3218-99 G co CCGG 99.070 -999.990 ... V4 2011 09 30 12 24 00 41.8100 -4.9300 850.00 845.00 5.00 324348 CIB 2011 09 19 09 45 00 2863-99 G co CCGG 100.840 -999.990 ... V2 2011 10 04 14 15 00 41.8100 -4.9300 850.00 845.00 5.00 324446 CIB 2011 09 19 09 45 00 2864-99 G co CCGG 100.010 -999.990 ... V2 2011 10 04 14 31 00 41.8100 -4.9300 850.00 845.00 5.00 324447 CIB 2011 09 26 09 02 00 2613-99 G co CCGG 113.840 -999.990 ... V4 2011 10 03 12 18 00 41.8100 -4.9300 850.00 845.00 5.00 324448 CIB 2011 09 26 09 02 00 2614-99 G co CCGG 113.080 -999.990 ... V4 2011 10 03 12 33 00 41.8100 -4.9300 850.00 845.00 5.00 324449 CIB 2011 10 03 08 40 00 2999-99 G co CCGG 120.710 -999.990 ... V2 2011 10 18 15 21 00 41.8100 -4.9300 850.00 845.00 5.00 325234 CIB 2011 10 03 08 40 00 3425-99 G co CCGG 121.470 -999.990 ... V2 2011 10 18 15 37 00 41.8100 -4.9300 850.00 845.00 5.00 325235 CIB 2011 10 10 09 30 00 2704-99 G co CCGG 91.090 -999.990 ... V2 2011 10 18 15 05 00 41.8100 -4.9300 850.00 845.00 5.00 325237 CIB 2011 10 10 09 30 00 65-99 G co CCGG 91.580 -999.990 ... V2 2011 10 18 14 48 00 41.8100 -4.9300 850.00 845.00 5.00 325236 CIB 2011 10 17 10 11 00 5375-99 G co CCGG 101.790 -999.990 ... V2 2011 11 04 15 27 00 41.8100 -4.9300 850.00 845.00 5.00 326124 CIB 2011 10 17 10 11 00 5376-99 G co CCGG 100.970 -999.990 ... V2 2011 11 04 15 43 00 41.8100 -4.9300 850.00 845.00 5.00 326125 CIB 2011 10 25 09 20 00 859-99 G co CCGG 107.860 -999.990 ... V4 2011 11 04 16 24 00 41.8100 -4.9300 850.00 845.00 5.00 326130 CIB 2011 10 25 09 20 00 860-99 G co CCGG 107.840 -999.990 ... V4 2011 11 04 16 39 00 41.8100 -4.9300 850.00 845.00 5.00 326131 CIB 2011 10 31 10 30 00 3424-99 G co CCGG 122.130 -999.990 ... V4 2011 11 22 17 00 00 41.8100 -4.9300 850.00 845.00 5.00 326892 CIB 2011 10 31 10 30 00 4929-99 G co CCGG 122.870 -999.990 ... V4 2011 11 22 16 45 00 41.8100 -4.9300 850.00 845.00 5.00 326891 CIB 2011 11 07 10 08 00 3458-99 G co CCGG 129.370 -999.990 ... V4 2011 11 22 16 30 00 41.8100 -4.9300 850.00 845.00 5.00 326894 CIB 2011 11 07 10 08 00 569-99 G co CCGG 129.560 -999.990 ... V4 2011 11 22 16 14 00 41.8100 -4.9300 850.00 845.00 5.00 326893 CIB 2011 11 14 10 10 00 567-99 G co CCGG 100.970 -999.990 ... V4 2011 12 09 13 06 00 41.8100 -4.9300 850.00 845.00 5.00 327474 CIB 2011 11 14 10 10 00 689-99 G co CCGG 148.820 -999.990 A.. V4 2011 12 09 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 327473 CIB 2011 11 21 12 08 00 2777-99 G co CCGG 115.960 -999.990 ... V2 2011 12 07 15 25 00 41.8100 -4.9300 850.00 845.00 5.00 327471 CIB 2011 11 21 12 08 00 6509-66 G co CCGG 115.770 -999.990 ... V2 2011 12 07 15 41 00 41.8100 -4.9300 850.00 845.00 5.00 327472 CIB 2011 11 28 12 15 00 3461-99 G co CCGG 155.520 -999.990 ... V4 2011 12 20 12 10 00 41.8100 -4.9300 850.00 845.00 5.00 327973 CIB 2011 11 28 12 15 00 3462-99 G co CCGG 156.000 -999.990 ... V4 2011 12 20 12 25 00 41.8100 -4.9300 850.00 845.00 5.00 327972 CIB 2011 12 05 13 05 00 5075-99 G co CCGG 113.000 -999.990 ... V4 2011 12 20 11 39 00 41.8100 -4.9300 850.00 845.00 5.00 327970 CIB 2011 12 05 13 05 00 5076-99 G co CCGG 113.660 -999.990 ... V4 2011 12 20 11 55 00 41.8100 -4.9300 850.00 845.00 5.00 327971 CIB 2011 12 12 10 00 00 1572-99 G co CCGG 129.260 -999.990 ... V2 2012 01 04 10 47 00 41.8100 -4.9300 850.00 845.00 5.00 328633 CIB 2011 12 12 10 00 00 4009-99 G co CCGG 129.000 -999.990 ... V2 2012 01 04 11 03 00 41.8100 -4.9300 850.00 845.00 5.00 328634 CIB 2011 12 19 09 30 00 3366-99 G co CCGG 137.380 -999.990 ... V2 2012 01 04 12 24 00 41.8100 -4.9300 850.00 845.00 5.00 328631 CIB 2011 12 19 09 30 00 376-99 G co CCGG 136.940 -999.990 ... V2 2012 01 04 12 41 00 41.8100 -4.9300 850.00 845.00 5.00 328632 CIB 2012 01 03 10 30 00 4775-99 G co CCGG 140.210 -999.990 ... V2 2012 01 23 14 29 00 41.8100 -4.9300 850.00 845.00 5.00 329697 CIB 2012 01 03 10 30 00 74-99 G co CCGG 138.860 -999.990 ... V2 2012 01 23 14 13 00 41.8100 -4.9300 850.00 845.00 5.00 329696 CIB 2012 01 09 10 00 00 3052-99 G co CCGG 104.080 -999.990 ... V2 2012 01 23 14 46 00 41.8100 -4.9300 850.00 845.00 5.00 329692 CIB 2012 01 09 10 00 00 5398-99 G co CCGG 104.880 -999.990 ... V2 2012 01 23 15 02 00 41.8100 -4.9300 850.00 845.00 5.00 329693 CIB 2012 01 16 10 30 00 1369-99 G co CCGG 129.150 -999.990 ... V2 2012 02 01 13 43 00 41.8100 -4.9300 850.00 845.00 5.00 330376 CIB 2012 01 16 10 30 00 3715-99 G co CCGG 129.400 -999.990 ... V2 2012 02 01 13 59 00 41.8100 -4.9300 850.00 845.00 5.00 330377 CIB 2012 01 23 10 20 00 4913-99 G co CCGG 118.640 -999.990 ... V2 2012 02 01 13 26 00 41.8100 -4.9300 850.00 845.00 5.00 330379 CIB 2012 01 23 10 20 00 553-99 G co CCGG 119.870 -999.990 ... V2 2012 02 01 13 10 00 41.8100 -4.9300 850.00 845.00 5.00 330378 CIB 2012 01 31 10 10 00 1254-99 G co CCGG 173.700 -999.990 .X. V4 2012 02 14 10 50 00 41.8100 -4.9300 850.00 845.00 5.00 331172 CIB 2012 01 31 10 10 00 6162-66 G co CCGG 172.590 -999.990 .X. V4 2012 02 14 11 05 00 41.8100 -4.9300 850.00 845.00 5.00 331173 CIB 2012 02 06 10 31 00 2674-99 G co CCGG 131.200 -999.990 ... V2 2012 02 14 10 03 00 41.8100 -4.9300 850.00 845.00 5.00 331174 CIB 2012 02 06 10 31 00 4439-99 G co CCGG 130.910 -999.990 ... V2 2012 02 14 10 19 00 41.8100 -4.9300 850.00 845.00 5.00 331175 CIB 2012 02 13 10 30 00 989-99 G co CCGG 144.230 -999.990 ... V4 2012 03 05 15 04 00 41.8100 -4.9300 850.00 845.00 5.00 332079 CIB 2012 02 13 10 30 00 990-99 G co CCGG 143.730 -999.990 ... V4 2012 03 05 15 19 00 41.8100 -4.9300 850.00 845.00 5.00 332080 CIB 2012 02 20 10 05 00 2375-99 G co CCGG 136.080 -999.990 ... V4 2012 03 05 14 33 00 41.8100 -4.9300 850.00 845.00 5.00 332081 CIB 2012 02 20 10 05 00 2376-99 G co CCGG 135.970 -999.990 ... V4 2012 03 05 14 49 00 41.8100 -4.9300 850.00 845.00 5.00 332082 CIB 2012 02 27 10 10 00 1188-99 G co CCGG 143.410 -999.990 ... V4 2012 03 16 10 45 00 41.8100 -4.9300 850.00 845.00 5.00 332651 CIB 2012 02 27 10 10 00 659-99 G co CCGG 144.360 -999.990 ... V4 2012 03 16 10 29 00 41.8100 -4.9300 850.00 845.00 5.00 332650 CIB 2012 03 05 10 30 00 4093-99 G co CCGG 138.990 -999.990 ... V4 2012 03 14 15 25 00 41.8100 -4.9300 850.00 845.00 5.00 332652 CIB 2012 03 05 10 30 00 4907-99 G co CCGG 139.190 -999.990 ... V4 2012 03 14 15 40 00 41.8100 -4.9300 850.00 845.00 5.00 332653 CIB 2012 03 12 11 00 00 1548-99 G co CCGG 154.470 -999.990 ... V4 2012 03 26 15 31 00 41.8100 -4.9300 850.00 845.00 5.00 333259 CIB 2012 03 12 11 00 00 5305-99 G co CCGG 152.840 -999.990 ... V4 2012 03 26 15 16 00 41.8100 -4.9300 850.00 845.00 5.00 333258 CIB 2012 03 20 10 40 00 1604-99 G co CCGG 153.040 -999.990 ... V4 2012 03 27 09 34 00 41.8100 -4.9300 850.00 845.00 5.00 333261 CIB 2012 03 20 10 40 00 5356-99 G co CCGG 152.700 -999.990 ... V4 2012 03 27 09 19 00 41.8100 -4.9300 850.00 845.00 5.00 333260 CIB 2012 03 26 09 20 00 4637-99 G co CCGG 121.420 -999.990 ... V4 2012 04 11 13 42 00 41.8100 -4.9300 850.00 845.00 5.00 333892 CIB 2012 03 26 09 20 00 4638-99 G co CCGG 120.410 -999.990 ... V4 2012 04 11 13 57 00 41.8100 -4.9300 850.00 845.00 5.00 333893 CIB 2012 04 02 09 35 00 3543-99 G co CCGG 139.710 -999.990 ... V4 2012 04 11 13 07 00 41.8100 -4.9300 850.00 845.00 5.00 333890 CIB 2012 04 02 09 35 00 3544-99 G co CCGG 139.430 -999.990 ... V4 2012 04 11 13 22 00 41.8100 -4.9300 850.00 845.00 5.00 333891 CIB 2012 04 09 09 35 00 2423-99 G co CCGG 142.190 -999.990 -.. V4 2012 05 03 14 42 00 41.8100 -4.9300 850.00 845.00 5.00 334516 CIB 2012 04 09 09 35 00 2424-99 G co CCGG 147.320 -999.990 +.. V4 2012 05 03 14 57 00 41.8100 -4.9300 850.00 845.00 5.00 334517 CIB 2012 04 16 09 05 00 5189-99 G co CCGG 135.190 -999.990 -.. V4 2012 05 03 12 40 00 41.8100 -4.9300 850.00 845.00 5.00 334518 CIB 2012 04 16 09 05 00 5190-99 G co CCGG 140.950 -999.990 +.. V4 2012 05 03 12 55 00 41.8100 -4.9300 850.00 845.00 5.00 334519 CIB 2012 04 24 10 35 00 1587-99 G co CCGG 140.890 -999.990 ... V2 2012 05 21 12 41 00 41.8100 -4.9300 850.00 845.00 5.00 335332 CIB 2012 04 24 10 35 00 3176-99 G co CCGG 139.910 -999.990 ... V2 2012 05 21 12 57 00 41.8100 -4.9300 850.00 845.00 5.00 335333 CIB 2012 04 30 10 45 00 1300-99 G co CCGG 141.210 -999.990 ... V2 2012 05 21 13 46 00 41.8100 -4.9300 850.00 845.00 5.00 335334 CIB 2012 04 30 10 45 00 3747-99 G co CCGG 140.720 -999.990 ... V2 2012 05 21 14 02 00 41.8100 -4.9300 850.00 845.00 5.00 335335 CIB 2012 05 07 09 45 00 2076-99 G co CCGG 127.160 -999.990 ... V2 2012 05 24 14 17 00 41.8100 -4.9300 850.00 845.00 5.00 335800 CIB 2012 05 07 09 45 00 2603-99 G co CCGG 125.360 -999.990 ... V2 2012 05 24 14 33 00 41.8100 -4.9300 850.00 845.00 5.00 335801 CIB 2012 05 15 09 30 00 55-99 G co CCGG 132.880 -999.990 ... V2 2012 05 24 13 44 00 41.8100 -4.9300 850.00 845.00 5.00 335802 CIB 2012 05 15 09 30 00 6393-66 G co CCGG 133.260 -999.990 ... V2 2012 05 24 14 00 00 41.8100 -4.9300 850.00 845.00 5.00 335803 CIB 2012 05 21 10 40 00 5419-99 G co CCGG 119.030 -999.990 ... V4 2012 06 06 11 54 00 41.8100 -4.9300 850.00 845.00 5.00 336488 CIB 2012 05 21 10 40 00 5420-99 G co CCGG 118.540 -999.990 ... V4 2012 06 06 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 336489 CIB 2012 05 28 09 10 00 3405-99 G co CCGG 122.740 -999.990 ... V4 2012 06 06 12 24 00 41.8100 -4.9300 850.00 845.00 5.00 336486 CIB 2012 05 28 09 10 00 3406-99 G co CCGG 122.720 -999.990 ... V4 2012 06 06 12 40 00 41.8100 -4.9300 850.00 845.00 5.00 336487 CIB 2012 06 04 09 40 00 1133-99 G co CCGG 120.640 -999.990 ... V4 2012 06 21 10 52 00 41.8100 -4.9300 850.00 845.00 5.00 337202 CIB 2012 06 04 09 40 00 869-99 G co CCGG 120.330 -999.990 ... V4 2012 06 21 10 37 00 41.8100 -4.9300 850.00 845.00 5.00 337201 CIB 2012 06 11 09 35 00 1134-99 G co CCGG 99.150 -999.990 ... V4 2012 06 21 11 07 00 41.8100 -4.9300 850.00 845.00 5.00 337203 CIB 2012 06 11 09 35 00 4799-99 G co CCGG 100.010 -999.990 ... V4 2012 06 21 11 22 00 41.8100 -4.9300 850.00 845.00 5.00 337204 CIB 2012 06 18 09 01 00 824-99 G co CCGG 85.390 -999.990 ... V4 2012 07 11 16 12 00 41.8100 -4.9300 850.00 845.00 5.00 337960 CIB 2012 06 18 09 01 00 825-99 G co CCGG 83.730 -999.990 ... V4 2012 07 11 16 27 00 41.8100 -4.9300 850.00 845.00 5.00 337961 CIB 2012 06 25 09 05 00 3374-99 G co CCGG 103.890 -999.990 ... V4 2012 07 11 15 41 00 41.8100 -4.9300 850.00 845.00 5.00 337962 CIB 2012 06 25 09 05 00 3416-99 G co CCGG 102.330 -999.990 ... V4 2012 07 11 15 56 00 41.8100 -4.9300 850.00 845.00 5.00 337963 CIB 2012 07 02 09 45 00 2421-99 G co CCGG 104.060 -999.990 ... V4 2012 07 25 12 19 00 41.8100 -4.9300 850.00 845.00 5.00 338493 CIB 2012 07 02 09 45 00 4414-99 G co CCGG 104.460 -999.990 ... V4 2012 07 25 12 34 00 41.8100 -4.9300 850.00 845.00 5.00 338494 CIB 2012 07 09 09 04 00 360-99 G co CCGG 116.180 -999.990 ... V4 2012 07 25 11 48 00 41.8100 -4.9300 850.00 845.00 5.00 338495 CIB 2012 07 09 09 04 00 4569-99 G co CCGG 116.230 -999.990 ... V4 2012 07 25 12 03 00 41.8100 -4.9300 850.00 845.00 5.00 338496 CIB 2012 07 16 09 15 00 389-99 G co CCGG 111.260 -999.990 ... V4 2012 08 08 15 23 00 41.8100 -4.9300 850.00 845.00 5.00 339049 CIB 2012 07 16 09 15 00 390-99 G co CCGG 111.120 -999.990 ... V4 2012 08 08 15 38 00 41.8100 -4.9300 850.00 845.00 5.00 339050 CIB 2012 07 23 09 05 00 5259-99 G co CCGG 115.350 -999.990 ... V4 2012 08 09 08 54 00 41.8100 -4.9300 850.00 845.00 5.00 339051 CIB 2012 07 23 09 05 00 5260-99 G co CCGG 115.210 -999.990 ... V4 2012 08 09 09 09 00 41.8100 -4.9300 850.00 845.00 5.00 339052 CIB 2012 07 30 10 00 00 1247-99 G co CCGG 134.290 -999.990 ... V4 2012 09 07 10 55 00 41.8100 -4.9300 850.00 845.00 5.00 340468 CIB 2012 07 30 10 00 00 1325-99 G co CCGG 135.390 -999.990 ... V4 2012 09 07 11 10 00 41.8100 -4.9300 850.00 845.00 5.00 340469 CIB 2012 08 07 09 20 00 3484-99 G co CCGG 128.470 -999.990 ... V4 2012 09 07 10 40 00 41.8100 -4.9300 850.00 845.00 5.00 340471 CIB 2012 08 07 09 20 00 3669-99 G co CCGG 128.600 -999.990 ... V4 2012 09 07 10 25 00 41.8100 -4.9300 850.00 845.00 5.00 340470 CIB 2012 08 20 08 45 00 4985-99 G co CCGG 119.250 -999.990 ... V4 2012 09 13 12 16 00 41.8100 -4.9300 850.00 845.00 5.00 340843 CIB 2012 08 20 08 45 00 4986-99 G co CCGG 118.950 -999.990 ... V4 2012 09 13 12 31 00 41.8100 -4.9300 850.00 845.00 5.00 340844 CIB 2012 08 27 09 08 00 355-99 G co CCGG 151.450 -999.990 ... V4 2012 09 13 12 46 00 41.8100 -4.9300 850.00 845.00 5.00 340841 CIB 2012 08 27 09 08 00 356-99 G co CCGG 152.230 -999.990 ... V4 2012 09 13 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 340842 CIB 2012 09 03 08 50 00 5145-99 G co CCGG 138.910 -999.990 ... V4 2012 10 01 13 10 00 41.8100 -4.9300 850.00 845.00 5.00 341744 CIB 2012 09 03 08 50 00 5146-99 G co CCGG 139.450 -999.990 ... V4 2012 10 01 13 25 00 41.8100 -4.9300 850.00 845.00 5.00 341745 CIB 2012 09 10 09 30 00 3355-99 G co CCGG 139.400 -999.990 ... V4 2012 10 01 12 39 00 41.8100 -4.9300 850.00 845.00 5.00 341742 CIB 2012 09 10 09 30 00 3356-99 G co CCGG 141.310 -999.990 ... V4 2012 10 01 12 54 00 41.8100 -4.9300 850.00 845.00 5.00 341743 CIB 2012 09 17 09 20 00 2559-99 G co CCGG 147.860 -999.990 ... V4 2012 10 04 12 45 00 41.8100 -4.9300 850.00 845.00 5.00 341982 CIB 2012 09 17 09 20 00 825-99 G co CCGG 149.170 -999.990 ... V4 2012 10 04 12 30 00 41.8100 -4.9300 850.00 845.00 5.00 341981 CIB 2012 09 24 09 30 00 5305-99 G co CCGG 118.230 -999.990 ... V4 2012 10 04 13 15 00 41.8100 -4.9300 850.00 845.00 5.00 341980 CIB 2012 09 24 09 30 00 824-99 G co CCGG 118.700 -999.990 ... V4 2012 10 04 13 00 00 41.8100 -4.9300 850.00 845.00 5.00 341979 CIB 2012 10 01 09 14 00 2083-99 G co CCGG 123.500 -999.990 ... V4 2012 10 25 10 38 00 41.8100 -4.9300 850.00 845.00 5.00 342606 CIB 2012 10 01 09 14 00 3347-99 G co CCGG 123.720 -999.990 ... V4 2012 10 25 10 53 00 41.8100 -4.9300 850.00 845.00 5.00 342607 CIB 2012 10 08 09 16 00 12-99 G co CCGG 119.020 -999.990 ... V4 2012 10 25 10 07 00 41.8100 -4.9300 850.00 845.00 5.00 342608 CIB 2012 10 08 09 16 00 2211-99 G co CCGG 118.790 -999.990 ... V4 2012 10 25 10 23 00 41.8100 -4.9300 850.00 845.00 5.00 342609 CIB 2012 10 15 11 00 00 1997-99 G co CCGG 118.910 -999.990 ... V4 2012 11 20 15 55 00 41.8100 -4.9300 850.00 845.00 5.00 343960 CIB 2012 10 15 11 00 00 4886-99 G co CCGG 119.840 -999.990 ... V4 2012 11 20 15 40 00 41.8100 -4.9300 850.00 845.00 5.00 343961 CIB 2012 10 22 10 20 00 1398-99 G co CCGG 129.480 -999.990 ... V4 2012 11 20 16 25 00 41.8100 -4.9300 850.00 845.00 5.00 343958 CIB 2012 10 22 10 20 00 3006-99 G co CCGG 129.430 -999.990 ... V4 2012 11 20 16 10 00 41.8100 -4.9300 850.00 845.00 5.00 343959 CIB 2012 10 29 11 10 00 2981-99 G co CCGG 124.760 -999.990 ... V4 2012 11 20 12 07 00 41.8100 -4.9300 850.00 845.00 5.00 343968 CIB 2012 10 29 11 10 00 426-99 G co CCGG 125.100 -999.990 ... V4 2012 11 20 12 22 00 41.8100 -4.9300 850.00 845.00 5.00 343969 CIB 2012 11 05 11 20 00 2951-99 G co CCGG 122.650 -999.990 ... V4 2012 11 20 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 343966 CIB 2012 11 05 11 20 00 5423-99 G co CCGG 122.870 -999.990 ... V4 2012 11 20 11 51 00 41.8100 -4.9300 850.00 845.00 5.00 343967 CIB 2012 11 12 10 05 00 4080-99 G co CCGG 122.130 -999.990 ... V4 2012 12 12 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 344502 CIB 2012 11 12 10 05 00 4564-99 G co CCGG 121.080 -999.990 ... V4 2012 12 12 14 09 00 41.8100 -4.9300 850.00 845.00 5.00 344503 CIB 2012 11 20 10 43 00 2746-99 G co CCGG 134.600 -999.990 ... V4 2012 12 12 13 23 00 41.8100 -4.9300 850.00 845.00 5.00 344504 CIB 2012 11 20 10 43 00 645-99 G co CCGG 134.190 -999.990 ... V4 2012 12 12 13 38 00 41.8100 -4.9300 850.00 845.00 5.00 344505 CIB 2012 11 26 10 07 00 4035-99 G co CCGG 124.850 -999.990 +.. V2 2012 12 18 13 49 00 41.8100 -4.9300 850.00 845.00 5.00 344919 CIB 2012 11 26 10 07 00 4036-99 G co CCGG 121.600 -999.990 -.. V2 2012 12 18 14 05 00 41.8100 -4.9300 850.00 845.00 5.00 344920 CIB 2012 12 03 10 30 00 6015-66 G co CCGG 135.290 -999.990 ... V2 2012 12 18 13 16 00 41.8100 -4.9300 850.00 845.00 5.00 344921 CIB 2012 12 03 10 30 00 6016-66 G co CCGG 137.480 -999.990 ... V2 2012 12 18 13 32 00 41.8100 -4.9300 850.00 845.00 5.00 344922 CIB 2012 12 10 10 38 00 1063-99 G co CCGG 174.980 -999.990 .X. V4 2013 01 10 12 21 00 41.8100 -4.9300 850.00 845.00 5.00 345536 CIB 2012 12 10 10 38 00 1064-99 G co CCGG 174.790 -999.990 .X. V4 2013 01 10 12 36 00 41.8100 -4.9300 850.00 845.00 5.00 345537 CIB 2012 12 17 13 30 00 1293-99 G co CCGG 122.640 -999.990 ... V4 2013 01 10 12 51 00 41.8100 -4.9300 850.00 845.00 5.00 345538 CIB 2012 12 17 13 30 00 1294-99 G co CCGG 119.830 -999.990 ... V4 2013 01 10 13 06 00 41.8100 -4.9300 850.00 845.00 5.00 345539 CIB 2013 01 03 11 05 00 1398-99 G co CCGG 129.970 -999.990 ... V2 2013 01 23 13 27 00 41.8100 -4.9300 850.00 845.00 5.00 346420 CIB 2013 01 03 11 05 00 2902-99 G co CCGG 131.560 -999.990 ... V2 2013 01 23 13 43 00 41.8100 -4.9300 850.00 845.00 5.00 346421 CIB 2013 01 08 11 30 00 3614-99 G co CCGG 133.890 -999.990 ... V2 2013 01 23 13 59 00 41.8100 -4.9300 850.00 845.00 5.00 346418 CIB 2013 01 08 11 30 00 4886-99 G co CCGG 135.500 -999.990 ... V2 2013 01 23 14 16 00 41.8100 -4.9300 850.00 845.00 5.00 346419 CIB 2013 01 14 10 35 00 1721-99 G co CCGG 142.390 -999.990 ... V4 2013 01 29 11 04 00 41.8100 -4.9300 850.00 845.00 5.00 346831 CIB 2013 01 14 10 35 00 2058-99 G co CCGG 141.350 -999.990 ... V4 2013 01 29 11 19 00 41.8100 -4.9300 850.00 845.00 5.00 346832 CIB 2013 01 21 10 07 00 5143-99 G co CCGG 136.900 -999.990 ... V4 2013 01 29 11 50 00 41.8100 -4.9300 850.00 845.00 5.00 346830 CIB 2013 01 21 10 07 00 930-99 G co CCGG 136.030 -999.990 ... V4 2013 01 29 11 35 00 41.8100 -4.9300 850.00 845.00 5.00 346829 CIB 2013 01 29 11 18 00 1007-99 G co CCGG 155.340 -999.990 ... V2 2013 02 11 13 37 00 41.8100 -4.9300 850.00 845.00 5.00 347482 CIB 2013 01 29 11 18 00 318-99 G co CCGG 155.980 -999.990 ... V2 2013 02 11 13 20 00 41.8100 -4.9300 850.00 845.00 5.00 347481 CIB 2013 02 04 10 10 00 1338-99 G co CCGG 147.880 -999.990 ... V2 2013 02 11 12 48 00 41.8100 -4.9300 850.00 845.00 5.00 347483 CIB 2013 02 04 10 10 00 1457-99 G co CCGG 149.200 -999.990 ... V2 2013 02 11 13 04 00 41.8100 -4.9300 850.00 845.00 5.00 347484 CIB 2013 02 11 10 05 00 1218-99 G co CCGG 141.420 -999.990 ... V2 2013 02 28 13 27 00 41.8100 -4.9300 850.00 845.00 5.00 348089 CIB 2013 02 11 10 05 00 1484-99 G co CCGG 137.970 -999.990 ... V2 2013 02 28 13 43 00 41.8100 -4.9300 850.00 845.00 5.00 348090 CIB 2013 02 18 10 40 00 2917-99 G co CCGG 139.130 -999.990 -.. V2 2013 02 28 13 59 00 41.8100 -4.9300 850.00 845.00 5.00 348091 CIB 2013 02 18 10 40 00 4738-99 G co CCGG 140.670 -999.990 +.. V2 2013 02 28 14 15 00 41.8100 -4.9300 850.00 845.00 5.00 348092 CIB 2013 02 26 10 40 00 3659-99 G co CCGG 178.140 -999.990 +.. V2 2013 03 13 15 13 00 41.8100 -4.9300 850.00 845.00 5.00 348559 CIB 2013 02 26 10 40 00 4353-99 G co CCGG 175.350 -999.990 -.. V2 2013 03 13 15 29 00 41.8100 -4.9300 850.00 845.00 5.00 348560 CIB 2013 03 04 10 36 00 1681-99 G co CCGG 165.480 -999.990 ... V2 2013 03 13 14 41 00 41.8100 -4.9300 850.00 845.00 5.00 348557 CIB 2013 03 04 10 36 00 4775-99 G co CCGG 164.910 -999.990 ... V2 2013 03 13 14 57 00 41.8100 -4.9300 850.00 845.00 5.00 348558 CIB 2013 03 11 11 30 00 411-99 G co CCGG 158.900 -999.990 ... V2 2013 03 26 14 36 00 41.8100 -4.9300 850.00 845.00 5.00 349274 CIB 2013 03 11 11 30 00 5060-99 G co CCGG 156.840 -999.990 ... V2 2013 03 26 14 52 00 41.8100 -4.9300 850.00 845.00 5.00 349275 CIB 2013 03 18 11 20 00 2513-99 G co CCGG 143.210 -999.990 ... V2 2013 03 26 14 03 00 41.8100 -4.9300 850.00 845.00 5.00 349276 CIB 2013 03 18 11 20 00 2559-99 G co CCGG 144.480 -999.990 ... V2 2013 03 26 14 20 00 41.8100 -4.9300 850.00 845.00 5.00 349277 CIB 2013 03 25 11 20 00 455-99 G co CCGG 151.860 -999.990 ... V4 2013 04 19 15 55 00 41.8100 -4.9300 850.00 845.00 5.00 350273 CIB 2013 03 25 11 20 00 4708-99 G co CCGG 152.590 -999.990 ... V4 2013 04 19 16 11 00 41.8100 -4.9300 850.00 845.00 5.00 350274 CIB 2013 04 04 09 05 00 258-99 G co CCGG 145.040 -999.990 ... V4 2013 04 19 15 39 00 41.8100 -4.9300 850.00 845.00 5.00 350272 CIB 2013 04 04 09 05 00 4613-99 G co CCGG 145.120 -999.990 ... V4 2013 04 19 15 23 00 41.8100 -4.9300 850.00 845.00 5.00 350271 CIB 2013 04 08 10 00 00 1693-99 G co CCGG 144.160 -999.990 ... V4 2013 04 23 14 17 00 41.8100 -4.9300 850.00 845.00 5.00 350496 CIB 2013 04 08 10 00 00 1694-99 G co CCGG 143.760 -999.990 ... V4 2013 04 23 14 33 00 41.8100 -4.9300 850.00 845.00 5.00 350497 CIB 2013 04 15 09 15 00 5249-99 G co CCGG 138.450 -999.990 ... V4 2013 04 23 14 49 00 41.8100 -4.9300 850.00 845.00 5.00 350498 CIB 2013 04 15 09 15 00 5250-99 G co CCGG 138.380 -999.990 ... V4 2013 04 23 15 05 00 41.8100 -4.9300 850.00 845.00 5.00 350499 CIB 2013 04 22 09 17 00 1711-99 G co CCGG 146.000 -999.990 ... V4 2013 05 17 12 10 00 41.8100 -4.9300 850.00 845.00 5.00 351510 CIB 2013 04 22 09 17 00 3534-99 G co CCGG 146.620 -999.990 ... V4 2013 05 17 12 26 00 41.8100 -4.9300 850.00 845.00 5.00 351511 CIB 2013 05 02 09 05 00 4184-99 G co CCGG 152.490 -999.990 ... V4 2013 05 17 11 38 00 41.8100 -4.9300 850.00 845.00 5.00 351512 CIB 2013 05 02 09 05 00 6835-66 G co CCGG 151.680 -999.990 ... V4 2013 05 17 11 54 00 41.8100 -4.9300 850.00 845.00 5.00 351513 CIB 2013 05 06 09 30 00 1114-99 G co CCGG 131.670 -999.990 ... V2 2013 05 29 13 44 00 41.8100 -4.9300 850.00 845.00 5.00 352097 CIB 2013 05 06 09 30 00 5394-99 G co CCGG 133.380 -999.990 ... V2 2013 05 29 13 28 00 41.8100 -4.9300 850.00 845.00 5.00 352096 CIB 2013 05 14 09 30 00 14-99 G co CCGG 131.770 -999.990 ... V2 2013 05 29 12 55 00 41.8100 -4.9300 850.00 845.00 5.00 352094 CIB 2013 05 14 09 30 00 3346-99 G co CCGG 131.790 -999.990 ... V2 2013 05 29 13 12 00 41.8100 -4.9300 850.00 845.00 5.00 352095 CIB 2013 05 20 09 12 00 5119-99 G co CCGG 130.290 -999.990 ... V4 2013 06 07 09 41 00 41.8100 -4.9300 850.00 845.00 5.00 352610 CIB 2013 05 20 09 12 00 796-99 G co CCGG 130.100 -999.990 ... V4 2013 06 07 09 25 00 41.8100 -4.9300 850.00 845.00 5.00 352609 CIB 2013 05 27 09 30 00 1138-99 G co CCGG 128.720 -999.990 ... V4 2013 06 07 08 53 00 41.8100 -4.9300 850.00 845.00 5.00 352607 CIB 2013 05 27 09 30 00 5071-99 G co CCGG 128.540 -999.990 ... V4 2013 06 07 09 09 00 41.8100 -4.9300 850.00 845.00 5.00 352608 CIB 2013 06 03 09 45 00 2088-99 G co CCGG 122.040 -999.990 ... V4 2013 06 18 15 45 00 41.8100 -4.9300 850.00 845.00 5.00 353567 CIB 2013 06 03 09 45 00 4-99 G co CCGG 123.360 -999.990 ... V4 2013 06 18 15 29 00 41.8100 -4.9300 850.00 845.00 5.00 353566 CIB 2013 06 11 09 23 00 3484-99 G co CCGG 102.110 -999.990 ... V4 2013 06 18 16 17 00 41.8100 -4.9300 850.00 845.00 5.00 353569 CIB 2013 06 11 09 23 00 5128-99 G co CCGG 102.140 -999.990 ... V4 2013 06 18 16 01 00 41.8100 -4.9300 850.00 845.00 5.00 353568 CIB 2013 06 18 09 15 00 4189-99 G co CCGG 103.310 -999.990 ... V4 2013 07 11 12 31 00 41.8100 -4.9300 850.00 845.00 5.00 354135 CIB 2013 06 18 09 15 00 460-99 G co CCGG 103.950 -999.990 ... V4 2013 07 11 12 15 00 41.8100 -4.9300 850.00 845.00 5.00 354134 CIB 2013 06 24 09 15 00 3730-99 G co CCGG 102.730 -999.990 ... V4 2013 07 11 11 43 00 41.8100 -4.9300 850.00 845.00 5.00 354136 CIB 2013 06 24 09 15 00 3878-99 G co CCGG 103.320 -999.990 ... V4 2013 07 11 11 59 00 41.8100 -4.9300 850.00 845.00 5.00 354137 CIB 2013 07 01 09 00 00 2498-99 G co CCGG 97.230 -999.990 ... V4 2013 07 29 15 32 00 41.8100 -4.9300 850.00 845.00 5.00 354855 CIB 2013 07 01 09 00 00 3991-99 G co CCGG 96.670 -999.990 ... V4 2013 07 29 15 16 00 41.8100 -4.9300 850.00 845.00 5.00 354856 CIB 2013 07 08 07 14 00 4045-99 G co CCGG 119.680 -999.990 ... V4 2013 07 29 15 48 00 41.8100 -4.9300 850.00 845.00 5.00 354853 CIB 2013 07 08 07 14 00 4350-99 G co CCGG 118.710 -999.990 ... V4 2013 07 29 16 04 00 41.8100 -4.9300 850.00 845.00 5.00 354854 CIB 2013 07 15 09 47 00 2583-99 G co CCGG 116.220 -999.990 ... V4 2013 08 14 13 47 00 41.8100 -4.9300 850.00 845.00 5.00 355703 CIB 2013 07 15 09 47 00 3326-99 G co CCGG 116.970 -999.990 ... V4 2013 08 14 13 31 00 41.8100 -4.9300 850.00 845.00 5.00 355702 CIB 2013 07 22 08 44 00 1712-99 G co CCGG 126.810 -999.990 ... V4 2013 08 14 14 19 00 41.8100 -4.9300 850.00 845.00 5.00 355705 CIB 2013 07 22 08 44 00 3735-99 G co CCGG 126.880 -999.990 ... V4 2013 08 14 14 03 00 41.8100 -4.9300 850.00 845.00 5.00 355704 CIB 2013 07 26 09 30 00 2077-99 G co CCGG 123.000 -999.990 ... V3 2013 09 30 11 29 00 41.8100 -4.9300 850.00 845.00 5.00 357378 CIB 2013 07 26 09 30 00 3635-99 G co CCGG 122.060 -999.990 ... V3 2013 09 30 11 46 00 41.8100 -4.9300 850.00 845.00 5.00 357379 CIB 2013 08 12 09 50 00 1866-99 G co CCGG 110.660 -999.990 ... V4 2013 09 30 12 16 00 41.8100 -4.9300 850.00 845.00 5.00 357381 CIB 2013 08 12 09 50 00 4738-99 G co CCGG 111.020 -999.990 ... V4 2013 09 30 12 00 00 41.8100 -4.9300 850.00 845.00 5.00 357380 CIB 2013 08 19 09 00 00 3794-99 G co CCGG 104.690 -999.990 ... V3 2013 09 30 12 34 00 41.8100 -4.9300 850.00 845.00 5.00 357390 CIB 2013 08 19 09 00 00 4165-99 G co CCGG 104.480 -999.990 ... V3 2013 09 30 12 50 00 41.8100 -4.9300 850.00 845.00 5.00 357391 CIB 2013 08 26 11 11 00 5405-99 G co CCGG 116.080 -999.990 ... V3 2013 09 30 10 57 00 41.8100 -4.9300 850.00 845.00 5.00 357376 CIB 2013 08 26 11 11 00 5407-99 G co CCGG 115.670 -999.990 ... V3 2013 09 30 11 13 00 41.8100 -4.9300 850.00 845.00 5.00 357377 CIB 2013 09 02 09 45 00 1744-99 G co CCGG 116.410 -999.990 ... V3 2013 10 24 09 13 00 41.8100 -4.9300 850.00 845.00 5.00 358078 CIB 2013 09 02 09 45 00 4529-99 G co CCGG 115.880 -999.990 ... V3 2013 10 24 09 29 00 41.8100 -4.9300 850.00 845.00 5.00 358079 CIB 2013 09 09 10 07 00 4233-99 G co CCGG 115.510 -999.990 ... V3 2013 10 24 10 01 00 41.8100 -4.9300 850.00 845.00 5.00 358081 CIB 2013 09 09 10 07 00 5317-99 G co CCGG 115.470 -999.990 ... V3 2013 10 24 09 45 00 41.8100 -4.9300 850.00 845.00 5.00 358080 CIB 2013 09 16 09 40 00 2984-99 G co CCGG 107.340 -999.990 ... V3 2013 10 31 14 28 00 41.8100 -4.9300 850.00 845.00 5.00 358367 CIB 2013 09 16 09 40 00 3519-99 G co CCGG 107.110 -999.990 ... V3 2013 10 31 14 44 00 41.8100 -4.9300 850.00 845.00 5.00 358368 CIB 2013 09 23 08 56 00 391-99 G co CCGG 105.790 -999.990 ... V4 2013 10 31 13 29 00 41.8100 -4.9300 850.00 845.00 5.00 358366 CIB 2013 09 23 08 56 00 956-99 G co CCGG 106.150 -999.990 ... V4 2013 10 31 13 13 00 41.8100 -4.9300 850.00 845.00 5.00 358365 CIB 2013 09 30 08 40 00 4559-99 G co CCGG 91.420 -999.990 ... V3 2013 11 12 16 32 00 41.8100 -4.9300 850.00 845.00 5.00 359617 CIB 2013 09 30 08 40 00 4560-99 G co CCGG 91.010 -999.990 ... V3 2013 11 12 16 48 00 41.8100 -4.9300 850.00 845.00 5.00 359618 CIB 2013 10 07 10 40 00 3001-99 G co CCGG 105.030 -999.990 ... V4 2013 11 12 14 48 00 41.8100 -4.9300 850.00 845.00 5.00 359619 CIB 2013 10 07 10 40 00 3002-99 G co CCGG 104.430 -999.990 ... V4 2013 11 12 15 04 00 41.8100 -4.9300 850.00 845.00 5.00 359620 CIB 2013 10 14 11 23 00 2350-99 G co CCGG 97.560 -999.990 ... V3 2013 11 14 13 24 00 41.8100 -4.9300 850.00 845.00 5.00 359623 CIB 2013 10 14 11 23 00 481-99 G co CCGG 98.170 -999.990 ... V3 2013 11 14 13 40 00 41.8100 -4.9300 850.00 845.00 5.00 359624 CIB 2013 10 21 08 20 00 1460-99 G co CCGG 98.980 -999.990 ... V3 2013 11 14 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 359622 CIB 2013 10 21 08 20 00 4161-99 G co CCGG 98.730 -999.990 ... V3 2013 11 14 13 56 00 41.8100 -4.9300 850.00 845.00 5.00 359621 CIB 2013 10 28 11 45 00 1148-99 G co CCGG 104.870 -999.990 ... V3 2013 11 21 13 48 00 41.8100 -4.9300 850.00 845.00 5.00 360285 CIB 2013 10 28 11 45 00 4210-99 G co CCGG 104.740 -999.990 ... V3 2013 11 21 14 04 00 41.8100 -4.9300 850.00 845.00 5.00 360286 CIB 2013 11 05 09 50 00 2035-99 G co CCGG 93.240 -999.990 ... V3 2013 11 21 14 37 00 41.8100 -4.9300 850.00 845.00 5.00 360284 CIB 2013 11 05 09 50 00 2815-99 G co CCGG 93.380 -999.990 ... V3 2013 11 21 14 20 00 41.8100 -4.9300 850.00 845.00 5.00 360283 CIB 2013 11 11 12 45 00 2773-99 G co CCGG 97.690 -999.990 ... V4 2013 12 03 14 15 00 41.8100 -4.9300 850.00 845.00 5.00 360887 CIB 2013 11 11 12 45 00 6605-66 G co CCGG 98.490 -999.990 ... V4 2013 12 03 14 31 00 41.8100 -4.9300 850.00 845.00 5.00 360886 CIB 2013 11 18 11 20 00 2118-99 G co CCGG 127.200 -999.990 ... V4 2013 12 03 14 47 00 41.8100 -4.9300 850.00 845.00 5.00 360888 CIB 2013 11 18 11 20 00 4802-99 G co CCGG 126.370 -999.990 ... V4 2013 12 03 15 03 00 41.8100 -4.9300 850.00 845.00 5.00 360889 CIB 2013 11 27 11 30 00 2281-99 G co CCGG 126.280 -999.990 ... V4 2013 12 17 13 13 00 41.8100 -4.9300 850.00 845.00 5.00 361624 CIB 2013 11 27 11 30 00 4130-99 G co CCGG 127.290 -999.990 ... V4 2013 12 17 12 57 00 41.8100 -4.9300 850.00 845.00 5.00 361623 CIB 2013 12 02 09 45 00 1755-99 G co CCGG 129.500 -999.990 ... V3 2013 12 17 13 15 00 41.8100 -4.9300 850.00 845.00 5.00 361626 CIB 2013 12 02 09 45 00 4658-99 G co CCGG 129.580 -999.990 ... V3 2013 12 17 12 59 00 41.8100 -4.9300 850.00 845.00 5.00 361625 CIB 2013 12 10 12 23 00 150-99 G co CCGG 139.750 -999.990 ... V4 2014 01 28 09 49 00 41.8100 -4.9300 850.00 845.00 5.00 362882 CIB 2013 12 10 12 23 00 4356-99 G co CCGG 140.210 -999.990 ... V4 2014 01 28 10 05 00 41.8100 -4.9300 850.00 845.00 5.00 362883 CIB 2013 12 17 10 30 00 3794-99 G co CCGG 181.940 -999.990 .X. V4 2014 01 28 10 21 00 41.8100 -4.9300 850.00 845.00 5.00 362884 CIB 2013 12 17 10 30 00 4165-99 G co CCGG 181.790 -999.990 .X. V4 2014 01 28 10 37 00 41.8100 -4.9300 850.00 845.00 5.00 362885 CIB 2014 01 07 10 00 00 4657-99 G co CCGG 106.950 -999.990 ... V4 2014 02 20 17 34 00 41.8100 -4.9300 850.00 845.00 5.00 364304 CIB 2014 01 07 10 00 00 6899-66 G co CCGG 106.750 -999.990 ... V4 2014 02 20 17 18 00 41.8100 -4.9300 850.00 845.00 5.00 364303 CIB 2014 01 14 10 15 00 2646-99 G co CCGG 119.430 -999.990 ... V3 2014 02 24 13 35 00 41.8100 -4.9300 850.00 845.00 5.00 364306 CIB 2014 01 14 10 15 00 4868-99 G co CCGG 119.270 -999.990 ... V3 2014 02 24 13 18 00 41.8100 -4.9300 850.00 845.00 5.00 364305 CIB 2014 01 21 09 10 00 1868-99 G co CCGG 146.430 -999.990 ... V4 2014 02 21 12 42 00 41.8100 -4.9300 850.00 845.00 5.00 364311 CIB 2014 01 21 09 10 00 4695-99 G co CCGG 146.210 -999.990 ... V4 2014 02 21 12 26 00 41.8100 -4.9300 850.00 845.00 5.00 364310 CIB 2014 01 28 09 15 00 2584-99 G co CCGG 129.190 -999.990 ... V4 2014 02 20 16 46 00 41.8100 -4.9300 850.00 845.00 5.00 364312 CIB 2014 01 28 09 15 00 5320-99 G co CCGG 128.440 -999.990 ... V4 2014 02 20 17 02 00 41.8100 -4.9300 850.00 845.00 5.00 364313 CIB 2014 02 04 09 17 00 3816-99 G co CCGG 136.930 -999.990 ... V4 2014 03 11 10 35 00 41.8100 -4.9300 850.00 845.00 5.00 365150 CIB 2014 02 04 09 17 00 4763-99 G co CCGG 136.590 -999.990 ... V4 2014 03 11 10 51 00 41.8100 -4.9300 850.00 845.00 5.00 365151 CIB 2014 02 10 11 29 00 3734-99 G co CCGG 140.960 -999.990 ... V4 2014 03 11 10 19 00 41.8100 -4.9300 850.00 845.00 5.00 365147 CIB 2014 02 10 11 29 00 477-99 G co CCGG 140.670 -999.990 ... V4 2014 03 11 10 03 00 41.8100 -4.9300 850.00 845.00 5.00 365146 CIB 2014 02 17 09 35 00 4403-99 G co CCGG 180.430 -999.990 .X. V4 2014 03 10 15 22 00 41.8100 -4.9300 850.00 845.00 5.00 365148 CIB 2014 02 17 09 35 00 5381-99 G co CCGG 181.290 -999.990 .X. V4 2014 03 10 15 38 00 41.8100 -4.9300 850.00 845.00 5.00 365149 CIB 2014 02 25 09 15 00 1341-99 G co CCGG 137.720 -999.990 ... V4 2014 03 11 09 47 00 41.8100 -4.9300 850.00 845.00 5.00 365144 CIB 2014 02 25 09 15 00 3550-99 G co CCGG 138.010 -999.990 ... V4 2014 03 11 09 31 00 41.8100 -4.9300 850.00 845.00 5.00 365145 CIB 2014 03 03 12 05 00 2264-99 G co CCGG 139.360 -999.990 ... V4 2014 04 10 12 57 00 41.8100 -4.9300 850.00 845.00 5.00 366280 CIB 2014 03 03 12 05 00 2535-99 G co CCGG 138.690 -999.990 ... V4 2014 04 10 12 41 00 41.8100 -4.9300 850.00 845.00 5.00 366281 CIB 2014 03 10 10 10 00 2348-99 G co CCGG 163.670 -999.990 ... V4 2014 04 10 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 366282 CIB 2014 03 10 10 10 00 364-99 G co CCGG 164.260 -999.990 ... V4 2014 04 10 12 25 00 41.8100 -4.9300 850.00 845.00 5.00 366283 CIB 2014 03 17 09 35 00 4275-99 G co CCGG 142.230 -999.990 ... V4 2014 04 09 14 25 00 41.8100 -4.9300 850.00 845.00 5.00 366241 CIB 2014 03 17 09 35 00 4401-99 G co CCGG 142.350 -999.990 ... V4 2014 04 09 14 09 00 41.8100 -4.9300 850.00 845.00 5.00 366240 CIB 2014 03 24 10 20 00 4878-99 G co CCGG 153.600 -999.990 ... V4 2014 04 09 11 58 00 41.8100 -4.9300 850.00 845.00 5.00 366238 CIB 2014 03 24 10 20 00 6339-66 G co CCGG 154.210 -999.990 ... V4 2014 04 09 12 14 00 41.8100 -4.9300 850.00 845.00 5.00 366239 CIB 2014 03 31 08 40 00 4128-99 G co CCGG 136.190 -999.990 ... V4 2014 05 22 13 18 00 41.8100 -4.9300 850.00 845.00 5.00 368014 CIB 2014 03 31 08 40 00 4157-99 G co CCGG 136.440 -999.990 ... V4 2014 05 22 13 02 00 41.8100 -4.9300 850.00 845.00 5.00 368013 CIB 2014 04 07 08 20 00 1561-99 G co CCGG 117.550 -999.990 ... V4 2014 05 22 12 30 00 41.8100 -4.9300 850.00 845.00 5.00 368017 CIB 2014 04 07 08 20 00 784-99 G co CCGG 117.620 -999.990 ... V4 2014 05 22 12 46 00 41.8100 -4.9300 850.00 845.00 5.00 368018 CIB 2014 04 22 09 30 00 4643-99 G co CCGG 128.290 -999.990 ... V4 2014 05 22 09 49 00 41.8100 -4.9300 850.00 845.00 5.00 368016 CIB 2014 04 22 09 30 00 4734-99 G co CCGG 127.660 -999.990 ... V4 2014 05 22 10 05 00 41.8100 -4.9300 850.00 845.00 5.00 368015 CIB 2014 04 29 08 30 00 1073-99 G co CCGG 124.100 -999.990 ... V4 2014 05 22 11 58 00 41.8100 -4.9300 850.00 845.00 5.00 368011 CIB 2014 04 29 08 30 00 4750-99 G co CCGG 124.810 -999.990 ... V4 2014 05 22 12 14 00 41.8100 -4.9300 850.00 845.00 5.00 368012 CIB 2014 05 05 08 05 00 1920-99 G co CCGG 148.310 -999.990 ... V4 2014 06 23 13 33 00 41.8100 -4.9300 850.00 845.00 5.00 369347 CIB 2014 05 05 08 05 00 352-99 G co CCGG 147.830 -999.990 ... V4 2014 06 23 13 17 00 41.8100 -4.9300 850.00 845.00 5.00 369346 CIB 2014 05 14 08 25 00 3162-99 G co CCGG 124.430 -999.990 ... V4 2014 06 23 13 49 00 41.8100 -4.9300 850.00 845.00 5.00 369348 CIB 2014 05 14 08 25 00 581-99 G co CCGG 124.470 -999.990 ... V4 2014 06 23 14 05 00 41.8100 -4.9300 850.00 845.00 5.00 369349 CIB 2014 05 19 08 44 00 1567-99 G co CCGG 137.940 -999.990 ... V4 2014 06 23 12 13 00 41.8100 -4.9300 850.00 845.00 5.00 369307 CIB 2014 05 19 08 44 00 2778-99 G co CCGG 136.900 -999.990 ... V4 2014 06 23 12 29 00 41.8100 -4.9300 850.00 845.00 5.00 369308 CIB 2014 06 03 09 50 00 1116-99 G co CCGG 116.680 -999.990 ... V4 2014 06 23 12 45 00 41.8100 -4.9300 850.00 845.00 5.00 369309 CIB 2014 06 03 09 50 00 4799-99 G co CCGG 115.980 -999.990 ... V4 2014 06 23 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 369310 CIB 2014 06 10 08 25 00 3014-99 G co CCGG 107.900 -999.990 ... V4 2014 07 18 13 37 00 41.8100 -4.9300 850.00 845.00 5.00 370498 CIB 2014 06 10 08 25 00 3728-99 G co CCGG 108.840 -999.990 ... V4 2014 07 18 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 370499 CIB 2014 06 18 08 00 00 2901-99 G co CCGG 115.390 -999.990 ... V4 2014 07 18 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 370501 CIB 2014 06 18 08 00 00 4000-99 G co CCGG 115.900 -999.990 ... V4 2014 07 18 13 05 00 41.8100 -4.9300 850.00 845.00 5.00 370500 CIB 2014 06 25 08 35 00 4359-99 G co CCGG 106.960 -999.990 ... V4 2014 07 18 09 53 00 41.8100 -4.9300 850.00 845.00 5.00 370495 CIB 2014 06 30 08 00 00 2011-99 G co CCGG 97.340 -999.990 ... V4 2014 07 18 12 33 00 41.8100 -4.9300 850.00 845.00 5.00 370496 CIB 2014 06 30 08 00 00 2012-99 G co CCGG 96.890 -999.990 ... V4 2014 07 18 12 49 00 41.8100 -4.9300 850.00 845.00 5.00 370497 CIB 2014 07 09 07 50 00 105-99 G co CCGG 89.610 -999.990 ... V4 2014 08 12 14 26 00 41.8100 -4.9300 850.00 845.00 5.00 372017 CIB 2014 07 09 07 50 00 106-99 G co CCGG 89.680 -999.990 ... V4 2014 08 12 14 42 00 41.8100 -4.9300 850.00 845.00 5.00 372018 CIB 2014 07 17 08 15 00 1565-99 G co CCGG 116.390 -999.990 ... V4 2014 08 12 14 58 00 41.8100 -4.9300 850.00 845.00 5.00 372019 CIB 2014 07 17 08 15 00 1566-99 G co CCGG 116.910 -999.990 ... V4 2014 08 12 15 14 00 41.8100 -4.9300 850.00 845.00 5.00 372020 CIB 2014 07 24 08 10 00 425-99 G co CCGG 114.690 -999.990 ... V4 2014 08 14 13 54 00 41.8100 -4.9300 850.00 845.00 5.00 371942 CIB 2014 07 24 08 10 00 799-99 G co CCGG 114.370 -999.990 ... V4 2014 08 14 13 38 00 41.8100 -4.9300 850.00 845.00 5.00 371941 CIB 2014 07 31 08 20 00 456-99 G co CCGG 116.230 -999.990 ... V4 2014 08 14 14 26 00 41.8100 -4.9300 850.00 845.00 5.00 371944 CIB 2014 07 31 08 20 00 4796-99 G co CCGG 115.160 -999.990 ... V4 2014 08 14 14 10 00 41.8100 -4.9300 850.00 845.00 5.00 371943 CIB 2014 08 13 10 05 00 3362-99 G co CCGG 120.230 -999.990 ... V4 2014 09 22 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 374275 CIB 2014 08 13 10 05 00 991-99 G co CCGG 120.830 -999.990 ... V4 2014 09 22 13 05 00 41.8100 -4.9300 850.00 845.00 5.00 374274 CIB 2014 08 21 08 10 00 1696-99 G co CCGG 119.630 -999.990 ... V4 2014 09 22 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 374277 CIB 2014 08 21 08 10 00 3019-99 G co CCGG 120.420 -999.990 ... V4 2014 09 22 13 37 00 41.8100 -4.9300 850.00 845.00 5.00 374276 CIB 2014 08 28 07 52 00 2455-99 G co CCGG 93.170 -999.990 ... V4 2014 09 22 12 49 00 41.8100 -4.9300 850.00 845.00 5.00 374271 CIB 2014 08 28 07 52 00 5287-99 G co CCGG 93.900 -999.990 ... V4 2014 09 22 12 32 00 41.8100 -4.9300 850.00 845.00 5.00 374270 CIB 2014 09 04 07 57 00 1461-99 G co CCGG 145.290 -999.990 ... V4 2014 09 22 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 374273 CIB 2014 09 04 07 57 00 4407-99 G co CCGG 146.590 -999.990 ... V4 2014 09 22 11 53 00 41.8100 -4.9300 850.00 845.00 5.00 374272 CIB 2014 09 11 08 10 00 1118-99 G co CCGG 105.590 -999.990 ... V4 2014 10 15 08 50 00 41.8100 -4.9300 850.00 845.00 5.00 375383 CIB 2014 09 11 08 10 00 4276-99 G co CCGG 105.020 -999.990 ... V4 2014 10 15 09 06 00 41.8100 -4.9300 850.00 845.00 5.00 375384 CIB 2014 09 18 08 30 00 1887-99 G co CCGG 102.370 -999.990 ... V4 2014 10 14 17 21 00 41.8100 -4.9300 850.00 845.00 5.00 375385 CIB 2014 09 18 08 30 00 6342-66 G co CCGG 101.160 -999.990 ... V4 2014 10 14 17 05 00 41.8100 -4.9300 850.00 845.00 5.00 375386 CIB 2014 09 25 08 30 00 4969-99 G co CCGG 114.850 -999.990 ... V4 2014 10 14 16 33 00 41.8100 -4.9300 850.00 845.00 5.00 375379 CIB 2014 09 25 08 30 00 4970-99 G co CCGG 114.920 -999.990 ... V4 2014 10 14 16 49 00 41.8100 -4.9300 850.00 845.00 5.00 375380 CIB 2014 10 01 09 50 00 487-99 G co CCGG 113.200 -999.990 ... V4 2014 10 14 16 01 00 41.8100 -4.9300 850.00 845.00 5.00 375381 CIB 2014 10 01 09 50 00 488-99 G co CCGG 112.240 -999.990 ... V4 2014 10 14 16 17 00 41.8100 -4.9300 850.00 845.00 5.00 375382 CIB 2014 10 09 09 15 00 577-99 G co CCGG 114.590 -999.990 ... V4 2014 11 25 09 51 00 41.8100 -4.9300 850.00 845.00 5.00 377358 CIB 2014 10 09 09 15 00 578-99 G co CCGG 115.720 -999.990 ... V4 2014 11 25 10 07 00 41.8100 -4.9300 850.00 845.00 5.00 377359 CIB 2014 10 16 08 35 00 793-99 G co CCGG 85.150 -999.990 ... V4 2014 11 25 09 19 00 41.8100 -4.9300 850.00 845.00 5.00 377360 CIB 2014 10 16 08 35 00 794-99 G co CCGG 85.130 -999.990 ... V4 2014 11 25 09 35 00 41.8100 -4.9300 850.00 845.00 5.00 377361 CIB 2014 10 22 09 05 00 2331-99 G co CCGG 105.690 -999.990 ... V4 2014 11 25 10 55 00 41.8100 -4.9300 850.00 845.00 5.00 377364 CIB 2014 10 22 09 05 00 4244-99 G co CCGG 105.950 -999.990 ... V4 2014 11 25 11 11 00 41.8100 -4.9300 850.00 845.00 5.00 377365 CIB 2014 10 30 09 20 00 1246-99 G co CCGG 106.100 -999.990 ... V4 2014 11 25 10 39 00 41.8100 -4.9300 850.00 845.00 5.00 377363 CIB 2014 10 30 09 20 00 1392-99 G co CCGG 105.840 -999.990 ... V4 2014 11 25 10 23 00 41.8100 -4.9300 850.00 845.00 5.00 377362 CIB 2014 11 05 10 50 00 1268-99 G co CCGG 115.460 -999.990 ... V4 2014 12 19 11 42 00 41.8100 -4.9300 850.00 845.00 5.00 378752 CIB 2014 11 05 10 50 00 2798-99 G co CCGG 115.530 -999.990 ... V4 2014 12 19 11 26 00 41.8100 -4.9300 850.00 845.00 5.00 378751 CIB 2014 11 12 10 45 00 2099-99 G co CCGG 119.170 -999.990 ... V4 2014 12 19 12 14 00 41.8100 -4.9300 850.00 845.00 5.00 378754 CIB 2014 11 12 10 45 00 2708-99 G co CCGG 119.670 -999.990 ... V4 2014 12 19 11 58 00 41.8100 -4.9300 850.00 845.00 5.00 378753 CIB 2014 11 20 09 05 00 1281-99 G co CCGG 114.980 -999.990 ... V4 2014 12 18 14 22 00 41.8100 -4.9300 850.00 845.00 5.00 378765 CIB 2014 11 20 09 05 00 6383-66 G co CCGG 114.480 -999.990 ... V4 2014 12 18 14 06 00 41.8100 -4.9300 850.00 845.00 5.00 378766 CIB 2014 11 26 10 30 00 157-99 G co CCGG 134.550 -999.990 ... V4 2014 12 18 14 38 00 41.8100 -4.9300 850.00 845.00 5.00 378763 CIB 2014 11 26 10 30 00 2265-99 G co CCGG 134.130 -999.990 ... V4 2014 12 18 14 54 00 41.8100 -4.9300 850.00 845.00 5.00 378764 CIB 2014 12 02 09 30 00 1031-99 G co CCGG 128.700 -999.990 ... V4 2015 02 10 15 18 00 41.8100 -4.9300 850.00 845.00 5.00 380844 CIB 2014 12 02 09 30 00 1754-99 G co CCGG 129.520 -999.990 ... V4 2015 02 10 15 34 00 41.8100 -4.9300 850.00 845.00 5.00 380845 CIB 2014 12 10 09 40 00 1642-99 G co CCGG 131.020 -999.990 ... V4 2015 02 11 09 29 00 41.8100 -4.9300 850.00 845.00 5.00 380846 CIB 2014 12 10 09 40 00 4910-99 G co CCGG 131.000 -999.990 ... V4 2015 02 11 09 45 00 41.8100 -4.9300 850.00 845.00 5.00 380847 CIB 2014 12 17 10 00 00 1786-99 G co CCGG 125.900 -999.990 ... V4 2015 02 10 14 46 00 41.8100 -4.9300 850.00 845.00 5.00 380842 CIB 2014 12 17 10 00 00 3452-99 G co CCGG 125.950 -999.990 ... V4 2015 02 10 15 02 00 41.8100 -4.9300 850.00 845.00 5.00 380843 CIB 2015 01 07 10 00 00 2563-99 G co CCGG 153.810 -999.990 ... V4 2015 02 10 14 30 00 41.8100 -4.9300 850.00 845.00 5.00 380841 CIB 2015 01 07 10 00 00 4742-99 G co CCGG 154.280 -999.990 ... V4 2015 02 10 14 14 00 41.8100 -4.9300 850.00 845.00 5.00 380840 CIB 2015 01 15 09 45 00 2280-99 G co CCGG 115.800 -999.990 ... V4 2015 03 10 16 13 00 41.8100 -4.9300 850.00 845.00 5.00 382024 CIB 2015 01 15 09 45 00 3645-99 G co CCGG 115.800 -999.990 ... V4 2015 03 10 15 57 00 41.8100 -4.9300 850.00 845.00 5.00 382023 CIB 2015 01 21 10 15 00 3997-99 G co CCGG 134.850 -999.990 ... V4 2015 03 10 15 25 00 41.8100 -4.9300 850.00 845.00 5.00 382019 CIB 2015 01 21 10 15 00 4627-99 G co CCGG 134.990 -999.990 ... V4 2015 03 10 15 41 00 41.8100 -4.9300 850.00 845.00 5.00 382020 CIB 2015 01 28 11 45 00 3555-99 G co CCGG 132.790 -999.990 ... V4 2015 03 11 10 11 00 41.8100 -4.9300 850.00 845.00 5.00 382025 CIB 2015 01 28 11 45 00 3556-99 G co CCGG 131.890 -999.990 ... V4 2015 03 11 10 27 00 41.8100 -4.9300 850.00 845.00 5.00 382026 CIB 2015 02 04 11 20 00 4505-99 G co CCGG 145.190 -999.990 ... V4 2015 03 11 09 39 00 41.8100 -4.9300 850.00 845.00 5.00 382027 CIB 2015 02 04 11 20 00 4506-99 G co CCGG 145.090 -999.990 ... V4 2015 03 11 09 55 00 41.8100 -4.9300 850.00 845.00 5.00 382028 CIB 2015 02 11 10 29 00 4709-99 G co CCGG 156.790 -999.990 ... V4 2015 04 13 10 33 00 41.8100 -4.9300 850.00 845.00 5.00 384308 CIB 2015 02 11 10 29 00 4710-99 G co CCGG 156.140 -999.990 ... V4 2015 04 13 10 49 00 41.8100 -4.9300 850.00 845.00 5.00 384309 CIB 2015 02 25 09 45 00 3401-99 G co CCGG 138.110 -999.990 ... V4 2015 04 14 10 08 00 41.8100 -4.9300 850.00 845.00 5.00 384304 CIB 2015 02 25 09 45 00 3402-99 G co CCGG 138.060 -999.990 ... V4 2015 04 14 10 24 00 41.8100 -4.9300 850.00 845.00 5.00 384305 CIB 2015 03 04 09 30 00 2065-99 G co CCGG 136.440 -999.990 ... V4 2015 04 13 11 05 00 41.8100 -4.9300 850.00 845.00 5.00 384310 CIB 2015 03 04 09 30 00 2066-99 G co CCGG 137.570 -999.990 ... V4 2015 04 13 11 20 00 41.8100 -4.9300 850.00 845.00 5.00 384311 CIB 2015 03 11 09 45 00 6061-66 G co CCGG 180.650 -999.990 ... V4 2015 04 13 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 384312 CIB 2015 03 11 09 45 00 6062-66 G co CCGG 179.400 -999.990 ... V4 2015 04 13 11 52 00 41.8100 -4.9300 850.00 845.00 5.00 384313 CIB 2015 03 19 09 10 00 4675-99 G co CCGG 159.790 -999.990 ... V4 2015 06 05 09 53 00 41.8100 -4.9300 850.00 845.00 5.00 387055 CIB 2015 03 19 09 10 00 4676-99 G co CCGG 159.150 -999.990 ... V4 2015 06 05 10 09 00 41.8100 -4.9300 850.00 845.00 5.00 387056 CIB 2015 03 25 09 20 00 119-99 G co CCGG 139.700 -999.990 ... V4 2015 06 05 10 56 00 41.8100 -4.9300 850.00 845.00 5.00 387051 CIB 2015 03 25 09 20 00 120-99 G co CCGG 139.900 -999.990 ... V4 2015 06 05 11 12 00 41.8100 -4.9300 850.00 845.00 5.00 387052 CIB 2015 04 08 08 02 00 3614-99 G co CCGG 151.210 -999.990 ... V4 2015 06 03 15 27 00 41.8100 -4.9300 850.00 845.00 5.00 387061 CIB 2015 04 08 08 02 00 4780-99 G co CCGG 150.940 -999.990 ... V4 2015 06 03 15 43 00 41.8100 -4.9300 850.00 845.00 5.00 387062 CIB 2015 04 15 08 00 00 803-99 G co CCGG 128.620 -999.990 ... V4 2015 06 04 09 26 00 41.8100 -4.9300 850.00 845.00 5.00 387059 CIB 2015 04 15 08 00 00 894-99 G co CCGG 130.150 -999.990 ... V4 2015 06 04 09 10 00 41.8100 -4.9300 850.00 845.00 5.00 387060 CIB 2015 04 22 08 05 00 2666-99 G co CCGG 139.390 -999.990 ... V4 2015 06 05 10 25 00 41.8100 -4.9300 850.00 845.00 5.00 387057 CIB 2015 04 22 08 05 00 6761-66 G co CCGG 139.490 -999.990 ... V4 2015 06 05 10 41 00 41.8100 -4.9300 850.00 845.00 5.00 387058 CIB 2015 04 29 08 15 00 2708-99 G co CCGG 137.960 -999.990 ... V4 2015 06 05 11 28 00 41.8100 -4.9300 850.00 845.00 5.00 387053 CIB 2015 04 29 08 15 00 4975-99 G co CCGG 138.310 -999.990 ... V4 2015 06 05 11 44 00 41.8100 -4.9300 850.00 845.00 5.00 387054 CIB 2015 05 06 07 50 00 4005-99 G co CCGG 126.280 -999.990 N.. V4 2015 07 08 14 06 00 41.8100 -4.9300 850.00 845.00 5.00 388419 CIB 2015 05 06 07 50 00 439-99 G co CCGG 125.830 -999.990 N.. V4 2015 07 08 13 51 00 41.8100 -4.9300 850.00 845.00 5.00 388420 CIB 2015 05 14 08 25 00 3171-99 G co CCGG 120.890 -999.990 ... V4 2015 07 08 14 22 00 41.8100 -4.9300 850.00 845.00 5.00 388423 CIB 2015 05 14 08 25 00 377-99 G co CCGG 120.630 -999.990 ... V4 2015 07 08 14 38 00 41.8100 -4.9300 850.00 845.00 5.00 388424 CIB 2015 05 20 07 45 00 1912-99 G co CCGG 127.570 -999.990 ... V4 2015 07 08 15 10 00 41.8100 -4.9300 850.00 845.00 5.00 388422 CIB 2015 05 20 07 45 00 554-99 G co CCGG 126.970 -999.990 ... V4 2015 07 08 14 54 00 41.8100 -4.9300 850.00 845.00 5.00 388421 CIB 2015 05 27 09 05 00 3918-99 G co CCGG 119.790 -999.990 ... V4 2015 07 08 13 35 00 41.8100 -4.9300 850.00 845.00 5.00 388426 CIB 2015 05 27 09 05 00 4830-99 G co CCGG 119.960 -999.990 ... V4 2015 07 08 13 19 00 41.8100 -4.9300 850.00 845.00 5.00 388425 CIB 2015 06 04 08 30 00 165-99 G co CCGG 126.540 -999.990 ... V4 2015 07 21 10 24 00 41.8100 -4.9300 850.00 845.00 5.00 389958 CIB 2015 06 04 08 30 00 166-99 G co CCGG 126.010 -999.990 ... V4 2015 07 21 10 40 00 41.8100 -4.9300 850.00 845.00 5.00 389959 CIB 2015 06 12 17 50 00 2049-99 G co CCGG 119.780 -999.990 ... V4 2015 07 21 13 02 00 41.8100 -4.9300 850.00 845.00 5.00 389962 CIB 2015 06 12 17 50 00 2050-99 G co CCGG 119.850 -999.990 ... V4 2015 07 21 13 18 00 41.8100 -4.9300 850.00 845.00 5.00 389963 CIB 2015 06 18 09 30 00 4158-99 G co CCGG 117.910 -999.990 ... V4 2015 07 21 09 52 00 41.8100 -4.9300 850.00 845.00 5.00 389956 CIB 2015 06 18 09 30 00 4207-99 G co CCGG 118.550 -999.990 ... V4 2015 07 21 10 08 00 41.8100 -4.9300 850.00 845.00 5.00 389957 CIB 2015 06 24 08 55 00 1939-99 G co CCGG 110.930 -999.990 ... V4 2015 07 20 14 42 00 41.8100 -4.9300 850.00 845.00 5.00 389960 CIB 2015 06 24 08 55 00 3347-99 G co CCGG 111.300 -999.990 ... V4 2015 07 20 14 58 00 41.8100 -4.9300 850.00 845.00 5.00 389961 CIB 2015 07 01 08 10 00 3730-99 G co CCGG 128.230 -999.990 ... V4 2015 08 19 16 39 00 41.8100 -4.9300 850.00 845.00 5.00 391963 CIB 2015 07 01 08 10 00 755-99 G co CCGG 130.410 -999.990 ... V4 2015 08 19 16 55 00 41.8100 -4.9300 850.00 845.00 5.00 391964 CIB 2015 07 08 08 40 00 1674-99 G co CCGG 107.390 -999.990 ... V4 2015 08 19 17 11 00 41.8100 -4.9300 850.00 845.00 5.00 391959 CIB 2015 07 08 08 40 00 3594-99 G co CCGG 108.500 -999.990 ... V4 2015 08 19 17 27 00 41.8100 -4.9300 850.00 845.00 5.00 391960 CIB 2015 07 15 09 10 00 3980-99 G co CCGG 143.050 -999.990 ... V4 2015 08 20 09 57 00 41.8100 -4.9300 850.00 845.00 5.00 391965 CIB 2015 07 15 09 10 00 973-99 G co CCGG 143.250 -999.990 ... V4 2015 08 20 10 13 00 41.8100 -4.9300 850.00 845.00 5.00 391966 CIB 2015 07 22 08 00 00 3003-99 G co CCGG 111.010 -999.990 ... V4 2015 08 20 10 29 00 41.8100 -4.9300 850.00 845.00 5.00 391961 CIB 2015 07 22 08 00 00 5195-99 G co CCGG 109.830 -999.990 ... V4 2015 08 20 10 45 00 41.8100 -4.9300 850.00 845.00 5.00 391962 CIB 2015 07 29 07 25 00 105-99 G co CCGG 132.160 -999.990 ... V4 2015 09 23 15 23 00 41.8100 -4.9300 850.00 845.00 5.00 394103 CIB 2015 07 29 07 25 00 106-99 G co CCGG 131.950 -999.990 ... V4 2015 09 23 15 39 00 41.8100 -4.9300 850.00 845.00 5.00 394104 CIB 2015 08 19 08 00 00 3088-99 G co CCGG 116.710 -999.990 ... V4 2015 09 23 14 04 00 41.8100 -4.9300 850.00 845.00 5.00 394101 CIB 2015 08 19 08 00 00 3807-99 G co CCGG 116.840 -999.990 ... V4 2015 09 23 13 48 00 41.8100 -4.9300 850.00 845.00 5.00 394102 CIB 2015 08 27 09 15 00 599-99 G co CCGG 89.980 -999.990 ... V4 2015 09 24 13 23 00 41.8100 -4.9300 850.00 845.00 5.00 394105 CIB 2015 08 27 09 15 00 600-99 G co CCGG 89.700 -999.990 ... V4 2015 09 24 13 39 00 41.8100 -4.9300 850.00 845.00 5.00 394106 CIB 2015 09 02 08 05 00 3617-99 G co CCGG 110.700 -999.990 ... V4 2015 09 24 13 55 00 41.8100 -4.9300 850.00 845.00 5.00 394107 CIB 2015 09 02 08 05 00 3618-99 G co CCGG 111.290 -999.990 ... V4 2015 09 24 14 10 00 41.8100 -4.9300 850.00 845.00 5.00 394108 CIB 2015 09 10 09 10 00 3775-99 G co CCGG 124.980 -999.990 ... V4 2015 10 22 12 48 00 41.8100 -4.9300 850.00 845.00 5.00 396060 CIB 2015 09 10 09 10 00 3776-99 G co CCGG 124.190 -999.990 ... V4 2015 10 22 13 04 00 41.8100 -4.9300 850.00 845.00 5.00 396061 CIB 2015 09 17 09 15 00 2853-99 G co CCGG 112.170 -999.990 ... V4 2015 10 22 14 23 00 41.8100 -4.9300 850.00 845.00 5.00 396058 CIB 2015 09 17 09 15 00 2854-99 G co CCGG 112.210 -999.990 ... V4 2015 10 22 14 39 00 41.8100 -4.9300 850.00 845.00 5.00 396059 CIB 2015 09 23 07 48 00 4295-99 G co CCGG 122.090 -999.990 ... V4 2015 10 22 14 07 00 41.8100 -4.9300 850.00 845.00 5.00 396057 CIB 2015 09 23 07 48 00 4922-99 G co CCGG 122.220 -999.990 ... V4 2015 10 22 13 52 00 41.8100 -4.9300 850.00 845.00 5.00 396056 CIB 2015 09 30 08 10 00 3027-99 G co CCGG 126.870 -999.990 ... V4 2015 10 23 09 08 00 41.8100 -4.9300 850.00 845.00 5.00 396018 CIB 2015 09 30 08 10 00 3050-99 G co CCGG 127.730 -999.990 ... V4 2015 10 23 09 24 00 41.8100 -4.9300 850.00 845.00 5.00 396019 CIB 2015 10 07 08 00 00 415-99 G co CCGG 107.820 -999.990 ... V4 2015 11 13 17 09 00 41.8100 -4.9300 850.00 845.00 5.00 397618 CIB 2015 10 07 08 00 00 570-99 G co CCGG 108.390 -999.990 ... V4 2015 11 13 16 54 00 41.8100 -4.9300 850.00 845.00 5.00 397617 CIB 2015 10 15 08 50 00 1467-99 G co CCGG 125.160 -999.990 ... V4 2015 11 13 15 34 00 41.8100 -4.9300 850.00 845.00 5.00 397616 CIB 2015 10 15 08 50 00 960-99 G co CCGG 125.390 -999.990 ... V4 2015 11 13 15 19 00 41.8100 -4.9300 850.00 845.00 5.00 397615 CIB 2015 10 21 09 20 00 1021-99 G co CCGG 127.010 -999.990 ... V4 2015 11 13 15 50 00 41.8100 -4.9300 850.00 845.00 5.00 397619 CIB 2015 10 21 09 20 00 1421-99 G co CCGG 127.300 -999.990 ... V4 2015 11 13 16 06 00 41.8100 -4.9300 850.00 845.00 5.00 397620 CIB 2015 10 29 08 50 00 4157-99 G co CCGG 110.460 -999.990 ... V4 2015 11 13 16 38 00 41.8100 -4.9300 850.00 845.00 5.00 397622 CIB 2015 10 29 08 50 00 639-99 G co CCGG 109.810 -999.990 ... V4 2015 11 13 16 22 00 41.8100 -4.9300 850.00 845.00 5.00 397621 CIB 2015 10 29 09 10 00 1090-99 G co CCGG 113.330 -999.990 ... V4 2016 01 07 12 29 00 41.8100 -4.9300 850.00 845.00 5.00 399840 CIB 2015 10 29 09 10 00 587-99 G co CCGG 110.640 -999.990 ... V4 2016 01 07 12 45 00 41.8100 -4.9300 850.00 845.00 5.00 399841 CIB 2015 11 04 09 50 00 3120-99 G co CCGG 109.600 -999.990 ... V4 2016 01 07 13 16 00 41.8100 -4.9300 850.00 845.00 5.00 399839 CIB 2015 11 04 09 50 00 3582-99 G co CCGG 109.160 -999.990 ... V4 2016 01 07 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 399838 CIB 2015 11 18 09 50 00 343-99 G co CCGG 173.010 -999.990 .X. V4 2016 01 11 12 13 00 41.8100 -4.9300 850.00 845.00 5.00 399828 CIB 2015 11 18 09 50 00 344-99 G co CCGG 171.830 -999.990 .X. V4 2016 01 11 12 29 00 41.8100 -4.9300 850.00 845.00 5.00 399829 CIB 2015 11 26 11 05 00 141-99 G co CCGG 115.130 -999.990 ... V4 2016 01 11 12 45 00 41.8100 -4.9300 850.00 845.00 5.00 399826 CIB 2015 11 26 11 05 00 142-99 G co CCGG 116.340 -999.990 ... V4 2016 01 11 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 399827 CIB 2015 12 03 08 35 00 4999-99 G co CCGG 164.810 -999.990 N.. V4 2016 01 08 11 12 00 41.8100 -4.9300 850.00 845.00 5.00 399836 CIB 2015 12 03 08 35 00 5000-99 G co CCGG 118.680 -999.990 N.. V4 2016 01 08 11 28 00 41.8100 -4.9300 850.00 845.00 5.00 399837 CIB 2015 12 10 09 05 00 5163-99 G co CCGG 120.130 -999.990 ... V4 2016 01 08 10 40 00 41.8100 -4.9300 850.00 845.00 5.00 399834 CIB 2015 12 10 09 05 00 5164-99 G co CCGG 120.380 -999.990 ... V4 2016 01 08 10 56 00 41.8100 -4.9300 850.00 845.00 5.00 399835 CIB 2015 12 16 09 50 00 1739-99 G co CCGG 123.530 -999.990 ... V4 2016 02 26 12 18 00 41.8100 -4.9300 850.00 845.00 5.00 402657 CIB 2015 12 16 09 50 00 4860-99 G co CCGG 122.740 -999.990 ... V4 2016 02 26 12 33 00 41.8100 -4.9300 850.00 845.00 5.00 402656 CIB 2016 01 13 10 10 00 3183-99 G co CCGG 164.600 -999.990 ... V4 2016 02 26 12 49 00 41.8100 -4.9300 850.00 845.00 5.00 402655 CIB 2016 01 13 10 10 00 3727-99 G co CCGG 163.240 -999.990 ... V4 2016 02 26 13 05 00 41.8100 -4.9300 850.00 845.00 5.00 402654 CIB 2016 01 20 09 34 00 4313-99 G co CCGG 174.380 -999.990 .X. V4 2016 02 25 13 48 00 41.8100 -4.9300 850.00 845.00 5.00 402466 CIB 2016 01 20 09 34 00 651-99 G co CCGG 174.630 -999.990 .X. V4 2016 02 25 14 04 00 41.8100 -4.9300 850.00 845.00 5.00 402467 CIB 2016 02 04 10 00 00 4252-99 G co CCGG 139.500 -999.990 ... V4 2016 02 25 14 36 00 41.8100 -4.9300 850.00 845.00 5.00 402469 CIB 2016 02 04 10 00 00 647-99 G co CCGG 139.270 -999.990 ... V4 2016 02 25 14 20 00 41.8100 -4.9300 850.00 845.00 5.00 402468 CIB 2016 02 11 11 30 00 4795-99 G co CCGG 126.120 -999.990 ... V4 2016 03 30 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 404253 CIB 2016 02 11 11 30 00 754-99 G co CCGG 125.840 -999.990 ... V4 2016 03 30 13 56 00 41.8100 -4.9300 850.00 845.00 5.00 404252 CIB 2016 02 19 13 00 00 3371-99 G co CCGG 124.830 -999.990 ... V4 2016 03 30 13 24 00 41.8100 -4.9300 850.00 845.00 5.00 404254 CIB 2016 02 19 13 00 00 3998-99 G co CCGG 124.220 -999.990 ... V4 2016 03 30 13 40 00 41.8100 -4.9300 850.00 845.00 5.00 404255 CIB 2016 02 24 10 00 00 3978-99 G co CCGG 126.380 -999.990 ... V4 2016 03 29 12 41 00 41.8100 -4.9300 850.00 845.00 5.00 404236 CIB 2016 02 24 10 00 00 960-99 G co CCGG 127.210 -999.990 ... V4 2016 03 29 12 56 00 41.8100 -4.9300 850.00 845.00 5.00 404237 CIB 2016 03 02 10 15 00 1419-99 G co CCGG 134.810 -999.990 ... V4 2016 03 29 12 25 00 41.8100 -4.9300 850.00 845.00 5.00 404239 CIB 2016 03 02 10 15 00 1925-99 G co CCGG 134.850 -999.990 ... V4 2016 03 29 12 09 00 41.8100 -4.9300 850.00 845.00 5.00 404238 CIB 2016 03 09 10 00 00 2498-99 G co CCGG 132.570 -999.990 ... V4 2016 05 06 14 26 00 41.8100 -4.9300 850.00 845.00 5.00 406440 CIB 2016 03 09 10 00 00 3257-99 G co CCGG 133.030 -999.990 ... V4 2016 05 06 14 10 00 41.8100 -4.9300 850.00 845.00 5.00 406439 CIB 2016 03 16 09 35 00 1576-99 G co CCGG 177.220 -999.990 ... V4 2016 05 06 14 57 00 41.8100 -4.9300 850.00 845.00 5.00 406442 CIB 2016 03 16 09 35 00 301-99 G co CCGG 179.290 -999.990 ... V4 2016 05 06 14 41 00 41.8100 -4.9300 850.00 845.00 5.00 406441 CIB 2016 04 06 12 10 00 2996-99 G co CCGG 131.660 -999.990 ... V4 2016 05 06 09 56 00 41.8100 -4.9300 850.00 845.00 5.00 406487 CIB 2016 04 06 12 10 00 3459-99 G co CCGG 132.220 -999.990 ... V4 2016 05 06 09 40 00 41.8100 -4.9300 850.00 845.00 5.00 406488 CIB 2016 04 13 09 28 00 1748-99 G co CCGG 133.690 -999.990 ... V4 2016 05 06 10 11 00 41.8100 -4.9300 850.00 845.00 5.00 406485 CIB 2016 04 13 09 28 00 412-99 G co CCGG 134.430 -999.990 ... V4 2016 05 06 10 27 00 41.8100 -4.9300 850.00 845.00 5.00 406486 CIB 2016 04 20 10 30 00 1967-99 G co CCGG 132.060 -999.990 ... V4 2016 06 02 11 32 00 41.8100 -4.9300 850.00 845.00 5.00 407666 CIB 2016 04 20 10 30 00 4183-99 G co CCGG 132.010 -999.990 ... V4 2016 06 02 11 16 00 41.8100 -4.9300 850.00 845.00 5.00 407667 CIB 2016 04 27 09 40 00 4737-99 G co CCGG 131.860 -999.990 ... V4 2016 06 02 12 03 00 41.8100 -4.9300 850.00 845.00 5.00 407668 CIB 2016 04 27 09 40 00 490-99 G co CCGG 132.160 -999.990 ... V4 2016 06 02 11 47 00 41.8100 -4.9300 850.00 845.00 5.00 407669 CIB 2016 05 04 10 11 00 2917-99 G co CCGG 125.090 -999.990 ... V4 2016 06 02 12 35 00 41.8100 -4.9300 850.00 845.00 5.00 407672 CIB 2016 05 04 10 11 00 358-99 G co CCGG 126.200 -999.990 ... V4 2016 06 02 12 19 00 41.8100 -4.9300 850.00 845.00 5.00 407673 CIB 2016 05 11 09 30 00 5257-99 G co CCGG 121.000 -999.990 ... V4 2016 06 02 12 51 00 41.8100 -4.9300 850.00 845.00 5.00 407670 CIB 2016 05 11 09 30 00 5282-99 G co CCGG 122.220 -999.990 ... V4 2016 06 02 13 07 00 41.8100 -4.9300 850.00 845.00 5.00 407671 CIB 2016 05 18 09 15 00 2796-99 G co CCGG 130.010 -999.990 ... V4 2016 07 01 12 21 00 41.8100 -4.9300 850.00 845.00 5.00 409354 CIB 2016 05 18 09 15 00 4511-99 G co CCGG 130.970 -999.990 ... V4 2016 07 01 12 05 00 41.8100 -4.9300 850.00 845.00 5.00 409353 CIB 2016 05 27 08 05 00 3119-99 G co CCGG 126.190 -999.990 ... V4 2016 07 01 10 46 00 41.8100 -4.9300 850.00 845.00 5.00 409355 CIB 2016 05 27 08 05 00 652-99 G co CCGG 125.640 -999.990 ... V4 2016 07 01 10 30 00 41.8100 -4.9300 850.00 845.00 5.00 409356 CIB 2016 06 01 08 45 00 4656-99 G co CCGG 116.940 -999.990 ... V4 2016 07 01 11 49 00 41.8100 -4.9300 850.00 845.00 5.00 409360 CIB 2016 06 01 08 45 00 4769-99 G co CCGG 116.960 -999.990 ... V4 2016 07 01 11 33 00 41.8100 -4.9300 850.00 845.00 5.00 409359 CIB 2016 06 08 08 50 00 1132-99 G co CCGG 128.130 -999.990 ... V4 2016 07 01 11 18 00 41.8100 -4.9300 850.00 845.00 5.00 409358 CIB 2016 06 08 08 50 00 4402-99 G co CCGG 128.940 -999.990 ... V4 2016 07 01 11 02 00 41.8100 -4.9300 850.00 845.00 5.00 409357 CIB 2016 06 15 10 20 00 4095-99 G co CCGG 99.530 -999.990 ... V4 2016 08 05 14 30 00 41.8100 -4.9300 850.00 845.00 5.00 411696 CIB 2016 06 15 10 20 00 4395-99 G co CCGG 99.520 -999.990 ... V4 2016 08 05 14 46 00 41.8100 -4.9300 850.00 845.00 5.00 411697 CIB 2016 06 22 12 10 00 1095-99 G co CCGG 100.190 -999.990 ... V4 2016 08 08 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 411694 CIB 2016 06 22 12 10 00 194-99 G co CCGG 99.730 -999.990 ... V4 2016 08 08 14 28 00 41.8100 -4.9300 850.00 845.00 5.00 411695 CIB 2016 06 29 12 20 00 4352-99 G co CCGG 121.140 -999.990 ... V4 2016 08 08 11 02 00 41.8100 -4.9300 850.00 845.00 5.00 411698 CIB 2016 06 29 12 20 00 4652-99 G co CCGG 122.330 -999.990 ... V4 2016 08 08 11 18 00 41.8100 -4.9300 850.00 845.00 5.00 411699 CIB 2016 07 06 11 30 00 1026-99 G co CCGG 100.400 -999.990 ... V4 2016 08 08 11 50 00 41.8100 -4.9300 850.00 845.00 5.00 411700 CIB 2016 07 06 11 30 00 519-99 G co CCGG 103.250 -999.990 ... V4 2016 08 08 11 34 00 41.8100 -4.9300 850.00 845.00 5.00 411701 CIB 2016 07 13 08 15 00 5010-99 G co CCGG 92.950 -999.990 ... V4 2016 08 05 13 59 00 41.8100 -4.9300 850.00 845.00 5.00 411654 CIB 2016 07 13 08 15 00 5365-99 G co CCGG 92.550 -999.990 ... V4 2016 08 05 14 15 00 41.8100 -4.9300 850.00 845.00 5.00 411655 CIB 2016 07 25 09 25 00 2136-99 G co CCGG 101.490 -999.990 ... V4 2016 08 05 13 43 00 41.8100 -4.9300 850.00 845.00 5.00 411652 CIB 2016 07 25 09 25 00 5265-99 G co CCGG 100.900 -999.990 ... V4 2016 08 05 13 27 00 41.8100 -4.9300 850.00 845.00 5.00 411653 CIB 2016 07 29 08 17 00 2463-99 G co CCGG 117.480 -999.990 ... V4 2016 09 28 11 01 00 41.8100 -4.9300 850.00 845.00 5.00 414042 CIB 2016 07 29 08 17 00 2823-99 G co CCGG 115.430 -999.990 ... V4 2016 09 28 10 45 00 41.8100 -4.9300 850.00 845.00 5.00 414041 CIB 2016 08 17 07 50 00 235-99 G co CCGG 143.990 -999.990 ... V4 2016 09 29 16 50 00 41.8100 -4.9300 850.00 845.00 5.00 414047 CIB 2016 08 17 07 50 00 4195-99 G co CCGG 142.150 -999.990 ... V4 2016 09 29 17 06 00 41.8100 -4.9300 850.00 845.00 5.00 414048 CIB 2016 08 25 09 50 00 3936-99 G co CCGG 124.630 -999.990 ... V4 2016 09 30 09 11 00 41.8100 -4.9300 850.00 845.00 5.00 414049 CIB 2016 08 25 09 50 00 554-99 G co CCGG 124.050 -999.990 ... V4 2016 09 30 09 27 00 41.8100 -4.9300 850.00 845.00 5.00 414050 CIB 2016 08 31 08 20 00 1510-99 G co CCGG 105.740 -999.990 ... V4 2016 09 30 09 43 00 41.8100 -4.9300 850.00 845.00 5.00 414051 CIB 2016 08 31 08 20 00 288-99 G co CCGG 105.520 -999.990 ... V4 2016 09 30 09 59 00 41.8100 -4.9300 850.00 845.00 5.00 414052 CIB 2016 09 15 09 05 00 1797-99 G co CCGG 97.280 -999.990 ... V4 2016 11 01 16 46 00 41.8100 -4.9300 850.00 845.00 5.00 415678 CIB 2016 09 15 09 05 00 1798-99 G co CCGG 96.610 -999.990 ... V4 2016 11 01 17 02 00 41.8100 -4.9300 850.00 845.00 5.00 415679 CIB 2016 09 21 08 55 00 3195-99 G co CCGG 107.660 -999.990 ... V4 2016 11 01 16 14 00 41.8100 -4.9300 850.00 845.00 5.00 415682 CIB 2016 09 21 08 55 00 3196-99 G co CCGG 108.410 -999.990 ... V4 2016 11 01 16 30 00 41.8100 -4.9300 850.00 845.00 5.00 415683 CIB 2016 09 29 09 37 00 2761-99 G co CCGG 88.350 -999.990 ... V4 2016 11 01 10 53 00 41.8100 -4.9300 850.00 845.00 5.00 415640 CIB 2016 09 29 09 37 00 2762-99 G co CCGG 87.200 -999.990 ... V4 2016 11 01 11 09 00 41.8100 -4.9300 850.00 845.00 5.00 415641 CIB 2016 10 05 09 10 00 759-99 G co CCGG 113.910 -999.990 ... V4 2016 11 01 11 25 00 41.8100 -4.9300 850.00 845.00 5.00 415642 CIB 2016 10 05 09 10 00 760-99 G co CCGG 113.880 -999.990 ... V4 2016 11 01 11 41 00 41.8100 -4.9300 850.00 845.00 5.00 415643 CIB 2016 10 13 11 45 00 1184-99 G co CCGG 125.050 -999.990 ... V4 2016 11 29 11 18 00 41.8100 -4.9300 850.00 845.00 5.00 417314 CIB 2016 10 13 11 45 00 1770-99 G co CCGG 124.690 -999.990 ... V4 2016 11 29 11 02 00 41.8100 -4.9300 850.00 845.00 5.00 417313 CIB 2016 10 20 09 18 00 3768-99 G co CCGG 122.950 -999.990 ... V4 2016 11 30 10 18 00 41.8100 -4.9300 850.00 845.00 5.00 417320 CIB 2016 10 20 09 18 00 3871-99 G co CCGG 122.670 -999.990 ... V4 2016 11 30 10 34 00 41.8100 -4.9300 850.00 845.00 5.00 417321 CIB 2016 10 27 09 10 00 1970-99 G co CCGG 110.710 -999.990 ... V4 2016 11 30 10 02 00 41.8100 -4.9300 850.00 845.00 5.00 417319 CIB 2016 10 27 09 10 00 3310-99 G co CCGG 111.420 -999.990 ... V4 2016 11 30 09 46 00 41.8100 -4.9300 850.00 845.00 5.00 417318 CIB 2016 11 03 09 45 00 152-99 G co CCGG 121.370 -999.990 ... V4 2016 11 29 16 37 00 41.8100 -4.9300 850.00 845.00 5.00 417317 CIB 2016 11 03 09 45 00 1761-99 G co CCGG 121.360 -999.990 ... V4 2016 11 29 16 21 00 41.8100 -4.9300 850.00 845.00 5.00 417316 CIB 2016 11 08 12 05 00 1431-99 G co CCGG 130.940 -999.990 ... V4 2016 12 20 08 55 00 41.8100 -4.9300 850.00 845.00 5.00 418194 CIB 2016 11 08 12 05 00 4404-99 G co CCGG 130.460 -999.990 ... V4 2016 12 20 09 11 00 41.8100 -4.9300 850.00 845.00 5.00 418195 CIB 2016 11 16 11 50 00 5274-99 G co CCGG 96.930 -999.990 ... V4 2016 12 20 12 22 00 41.8100 -4.9300 850.00 845.00 5.00 418322 CIB 2016 11 16 11 50 00 5283-99 G co CCGG 98.720 -999.990 ... V4 2016 12 20 12 07 00 41.8100 -4.9300 850.00 845.00 5.00 418323 CIB 2016 11 24 11 45 00 1486-99 G co CCGG 121.570 -999.990 ... V4 2016 12 20 10 47 00 41.8100 -4.9300 850.00 845.00 5.00 418201 CIB 2016 11 24 11 45 00 817-99 G co CCGG 122.650 -999.990 ... V4 2016 12 20 10 31 00 41.8100 -4.9300 850.00 845.00 5.00 418200 CIB 2016 11 30 11 20 00 1063-99 G co CCGG 125.390 -999.990 ... V4 2016 12 16 11 41 00 41.8100 -4.9300 850.00 845.00 5.00 418266 CIB 2016 11 30 11 20 00 2942-99 G co CCGG 124.180 -999.990 ... V4 2016 12 16 11 57 00 41.8100 -4.9300 850.00 845.00 5.00 418267 CIB 2016 12 12 12 45 00 2952-99 G co CCGG 119.930 -999.990 ... V4 2017 01 31 10 42 00 41.8100 -4.9300 850.00 845.00 5.00 419836 CIB 2016 12 12 12 45 00 669-99 G co CCGG 118.120 -999.990 ... V4 2017 01 31 10 58 00 41.8100 -4.9300 850.00 845.00 5.00 419837 CIB 2016 12 16 09 25 00 1634-99 G co CCGG 133.620 -999.990 ... V4 2017 01 31 10 26 00 41.8100 -4.9300 850.00 845.00 5.00 419839 CIB 2016 12 16 09 25 00 5010-99 G co CCGG 133.230 -999.990 ... V4 2017 01 31 10 10 00 41.8100 -4.9300 850.00 845.00 5.00 419838 CIB 2016 12 21 10 05 00 2884-99 G co CCGG 128.020 -999.990 ... V4 2017 01 30 15 33 00 41.8100 -4.9300 850.00 845.00 5.00 419825 CIB 2016 12 21 10 05 00 405-99 G co CCGG 128.420 -999.990 ... V4 2017 01 30 15 17 00 41.8100 -4.9300 850.00 845.00 5.00 419824 CIB 2017 01 09 12 00 00 1581-99 G co CCGG 114.860 -999.990 ... V4 2017 01 30 15 49 00 41.8100 -4.9300 850.00 845.00 5.00 419826 CIB 2017 01 09 12 00 00 3253-99 G co CCGG 114.710 -999.990 ... V4 2017 01 30 16 05 00 41.8100 -4.9300 850.00 845.00 5.00 419827 CIB 2017 01 26 09 50 00 3051-99 G co CCGG 118.520 -999.990 ... V4 2017 03 17 11 20 00 41.8100 -4.9300 850.00 845.00 5.00 422228 CIB 2017 01 26 09 50 00 4761-99 G co CCGG 118.870 -999.990 ... V4 2017 03 17 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 422229 CIB 2017 01 31 12 00 00 1407-99 G co CCGG 128.250 -999.990 ... V4 2017 03 17 11 52 00 41.8100 -4.9300 850.00 845.00 5.00 422224 CIB 2017 01 31 12 00 00 3155-99 G co CCGG 128.870 -999.990 ... V4 2017 03 17 12 08 00 41.8100 -4.9300 850.00 845.00 5.00 422225 CIB 2017 02 07 10 50 00 3384-99 G co CCGG 121.640 -999.990 ... V4 2017 03 14 16 29 00 41.8100 -4.9300 850.00 845.00 5.00 422223 CIB 2017 02 07 10 50 00 3989-99 G co CCGG 123.930 -999.990 ... V4 2017 03 14 16 45 00 41.8100 -4.9300 850.00 845.00 5.00 422222 CIB 2017 02 16 12 20 00 2265-99 G co CCGG 140.170 -999.990 ... V4 2017 03 14 15 58 00 41.8100 -4.9300 850.00 845.00 5.00 422226 CIB 2017 02 16 12 20 00 5415-99 G co CCGG 140.880 -999.990 ... V4 2017 03 14 16 13 00 41.8100 -4.9300 850.00 845.00 5.00 422227 CIB 2017 02 22 10 32 00 1255-99 G co CCGG 132.100 -999.990 ... V4 2017 04 10 12 58 00 41.8100 -4.9300 850.00 845.00 5.00 423375 CIB 2017 02 22 10 32 00 1256-99 G co CCGG 130.810 -999.990 ... V4 2017 04 10 13 13 00 41.8100 -4.9300 850.00 845.00 5.00 423376 CIB 2017 03 01 09 45 00 5591-99 G co CCGG 131.950 -999.990 ... V4 2017 04 10 11 54 00 41.8100 -4.9300 850.00 845.00 5.00 423373 CIB 2017 03 01 09 45 00 5592-99 G co CCGG 131.850 -999.990 ... V4 2017 04 10 12 10 00 41.8100 -4.9300 850.00 845.00 5.00 423374 CIB 2017 03 08 09 45 00 3895-99 G co CCGG 130.110 -999.990 ... V4 2017 04 07 10 16 00 41.8100 -4.9300 850.00 845.00 5.00 423322 CIB 2017 03 08 09 45 00 4240-99 G co CCGG 130.420 -999.990 ... V4 2017 04 07 10 01 00 41.8100 -4.9300 850.00 845.00 5.00 423321 CIB 2017 03 20 10 06 00 3960-99 G co CCGG 147.800 -999.990 N.. V4 2017 04 07 09 26 00 41.8100 -4.9300 850.00 845.00 5.00 423323 CIB 2017 03 20 10 06 00 4580-99 G co CCGG 153.130 -999.990 N.. V4 2017 04 07 09 42 00 41.8100 -4.9300 850.00 845.00 5.00 423324 CIB 2017 03 29 08 51 00 5300-99 G co CCGG 136.540 -999.990 ... V4 2017 05 19 17 16 00 41.8100 -4.9300 850.00 845.00 5.00 425592 CIB 2017 03 29 08 51 00 5375-99 G co CCGG 137.350 -999.990 ... V4 2017 05 19 17 00 00 41.8100 -4.9300 850.00 845.00 5.00 425593 CIB 2017 04 06 09 05 00 1104-99 G co CCGG 139.040 -999.990 ... V4 2017 05 19 16 28 00 41.8100 -4.9300 850.00 845.00 5.00 425594 CIB 2017 04 06 09 05 00 1190-99 G co CCGG 138.990 -999.990 ... V4 2017 05 19 16 44 00 41.8100 -4.9300 850.00 845.00 5.00 425595 CIB 2017 04 19 11 45 00 1003-99 G co CCGG 138.670 -999.990 ... V4 2017 05 19 14 05 00 41.8100 -4.9300 850.00 845.00 5.00 425598 CIB 2017 04 19 11 45 00 813-99 G co CCGG 139.190 -999.990 ... V4 2017 05 19 13 50 00 41.8100 -4.9300 850.00 845.00 5.00 425599 CIB 2017 04 26 09 50 00 4143-99 G co CCGG 131.700 -999.990 ... V4 2017 05 22 12 38 00 41.8100 -4.9300 850.00 845.00 5.00 425597 CIB 2017 04 26 09 50 00 4865-99 G co CCGG 131.300 -999.990 ... V4 2017 05 22 12 23 00 41.8100 -4.9300 850.00 845.00 5.00 425596 CIB 2017 05 03 11 05 00 4104-99 G co CCGG 116.760 -999.990 ... V2 2017 06 22 16 33 00 41.8100 -4.9300 850.00 845.00 5.00 427115 CIB 2017 05 03 11 05 00 5713-99 G co CCGG 117.460 -999.990 ... V2 2017 06 22 16 49 00 41.8100 -4.9300 850.00 845.00 5.00 427116 CIB 2017 05 11 08 50 00 2425-99 G co CCGG 111.270 -999.990 ... V2 2017 06 23 09 08 00 41.8100 -4.9300 850.00 845.00 5.00 427114 CIB 2017 05 11 08 50 00 93-99 G co CCGG 115.210 -999.990 ... V2 2017 06 23 08 52 00 41.8100 -4.9300 850.00 845.00 5.00 427113 CIB 2017 05 17 08 20 00 5705-99 G co CCGG 109.970 -999.990 ... V2 2017 06 23 09 24 00 41.8100 -4.9300 850.00 845.00 5.00 427174 CIB 2017 05 17 08 20 00 5706-99 G co CCGG 110.020 -999.990 ... V2 2017 06 23 09 40 00 41.8100 -4.9300 850.00 845.00 5.00 427175 CIB 2017 05 24 09 15 00 2507-99 G co CCGG 107.790 -999.990 ... V2 2017 06 26 11 20 00 41.8100 -4.9300 850.00 845.00 5.00 427207 CIB 2017 05 24 09 15 00 2508-99 G co CCGG 107.780 -999.990 ... V2 2017 06 26 11 04 00 41.8100 -4.9300 850.00 845.00 5.00 427208 CIB 2017 05 31 08 20 00 1609-99 G co CCGG 112.690 -999.990 ... V2 2017 06 22 14 10 00 41.8100 -4.9300 850.00 845.00 5.00 427102 CIB 2017 05 31 08 20 00 1610-99 G co CCGG 113.450 -999.990 ... V2 2017 06 22 13 54 00 41.8100 -4.9300 850.00 845.00 5.00 427101 CIB 2017 06 07 08 10 00 867-99 G co CCGG 102.220 -999.990 ... V2 2017 06 22 13 22 00 41.8100 -4.9300 850.00 845.00 5.00 427103 CIB 2017 06 07 08 10 00 868-99 G co CCGG 102.610 -999.990 ... V2 2017 06 22 13 38 00 41.8100 -4.9300 850.00 845.00 5.00 427104 CIB 2017 06 14 08 25 00 5207-99 G co CCGG 119.430 -999.990 ... V2 2017 07 27 10 39 00 41.8100 -4.9300 850.00 845.00 5.00 428351 CIB 2017 06 14 08 25 00 5208-99 G co CCGG 118.250 -999.990 ... V2 2017 07 27 10 55 00 41.8100 -4.9300 850.00 845.00 5.00 428352 CIB 2017 06 22 09 15 00 5593-99 G co CCGG 135.430 -999.990 ... V2 2017 07 27 10 07 00 41.8100 -4.9300 850.00 845.00 5.00 428355 CIB 2017 06 22 09 15 00 5594-99 G co CCGG 135.470 -999.990 ... V2 2017 07 27 10 23 00 41.8100 -4.9300 850.00 845.00 5.00 428356 CIB 2017 06 27 11 10 00 2141-99 G co CCGG 91.460 -999.990 ... V2 2017 07 27 09 35 00 41.8100 -4.9300 850.00 845.00 5.00 428353 CIB 2017 06 27 11 10 00 2142-99 G co CCGG 90.920 -999.990 ... V2 2017 07 27 09 51 00 41.8100 -4.9300 850.00 845.00 5.00 428354 CIB 2017 07 05 08 42 00 5671-99 G co CCGG 127.140 -999.990 ... V2 2017 07 27 09 04 00 41.8100 -4.9300 850.00 845.00 5.00 428349 CIB 2017 07 05 08 42 00 5672-99 G co CCGG 126.180 -999.990 ... V2 2017 07 27 09 20 00 41.8100 -4.9300 850.00 845.00 5.00 428350 CIB 2017 07 13 09 15 00 4233-99 G co CCGG 104.930 -999.990 ... V2 2017 08 11 10 24 00 41.8100 -4.9300 850.00 845.00 5.00 428847 CIB 2017 07 13 09 15 00 4583-99 G co CCGG 104.670 -999.990 ... V2 2017 08 11 10 40 00 41.8100 -4.9300 850.00 845.00 5.00 428848 CIB 2017 07 20 08 45 00 3348-99 G co CCGG 99.110 -999.990 N.. V2 2017 08 11 10 56 00 41.8100 -4.9300 850.00 845.00 5.00 428845 CIB 2017 07 20 08 45 00 5348-99 G co CCGG 88.020 -999.990 ... V2 2017 08 11 11 11 00 41.8100 -4.9300 850.00 845.00 5.00 428846 CIB 2017 07 26 07 45 00 727-99 G co CCGG 97.330 -999.990 ... V2 2017 09 26 15 41 00 41.8100 -4.9300 850.00 845.00 5.00 431180 CIB 2017 07 26 07 45 00 728-99 G co CCGG 96.670 -999.990 ... V2 2017 09 26 15 56 00 41.8100 -4.9300 850.00 845.00 5.00 431181 CIB 2017 08 16 09 35 00 1421-99 G co CCGG 110.770 -999.990 ... V2 2017 09 26 16 28 00 41.8100 -4.9300 850.00 845.00 5.00 431182 CIB 2017 08 16 09 35 00 1461-99 G co CCGG 110.000 -999.990 ... V2 2017 09 26 16 12 00 41.8100 -4.9300 850.00 845.00 5.00 431183 CIB 2017 08 23 10 45 00 1169-99 G co CCGG 279.360 -999.990 .X. V2 2017 09 21 16 17 00 41.8100 -4.9300 850.00 845.00 5.00 431090 CIB 2017 08 23 10 45 00 1170-99 G co CCGG 280.680 -999.990 .X. V2 2017 09 21 16 02 00 41.8100 -4.9300 850.00 845.00 5.00 431089 CIB 2017 08 30 08 50 00 3923-99 G co CCGG 119.400 -999.990 ... V2 2017 09 21 16 33 00 41.8100 -4.9300 850.00 845.00 5.00 431087 CIB 2017 08 30 08 50 00 3924-99 G co CCGG 118.580 -999.990 ... V2 2017 09 21 16 49 00 41.8100 -4.9300 850.00 845.00 5.00 431088 CIB 2017 09 06 08 45 00 3303-99 G co CCGG 121.720 -999.990 ... V2 2017 10 13 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 432340 CIB 2017 09 06 08 45 00 3304-99 G co CCGG 120.540 -999.990 ... V2 2017 10 13 13 05 00 41.8100 -4.9300 850.00 845.00 5.00 432341 CIB 2017 09 13 10 30 00 987-99 G co CCGG 105.890 -999.990 ... V2 2017 10 13 13 37 00 41.8100 -4.9300 850.00 845.00 5.00 432342 CIB 2017 09 13 10 30 00 988-99 G co CCGG 105.450 -999.990 ... V2 2017 10 13 13 53 00 41.8100 -4.9300 850.00 845.00 5.00 432343 CIB 2017 09 21 10 45 00 2121-99 G co CCGG 161.060 -999.990 .X. V2 2017 10 16 16 56 00 41.8100 -4.9300 850.00 845.00 5.00 432317 CIB 2017 09 21 10 45 00 2122-99 G co CCGG 160.870 -999.990 .X. V2 2017 10 16 16 40 00 41.8100 -4.9300 850.00 845.00 5.00 432318 CIB 2017 09 28 09 15 00 1377-99 G co CCGG 92.600 -999.990 ... V2 2017 10 16 16 09 00 41.8100 -4.9300 850.00 845.00 5.00 432319 CIB 2017 09 28 09 15 00 1378-99 G co CCGG 92.100 -999.990 ... V2 2017 10 16 16 24 00 41.8100 -4.9300 850.00 845.00 5.00 432320 CIB 2017 10 05 09 45 00 2169-99 G co CCGG 91.540 -999.990 ... V2 2017 11 27 10 46 00 41.8100 -4.9300 850.00 845.00 5.00 434474 CIB 2017 10 05 09 45 00 2170-99 G co CCGG 91.010 -999.990 ... V2 2017 11 27 11 02 00 41.8100 -4.9300 850.00 845.00 5.00 434475 CIB 2017 10 11 08 40 00 1927-99 G co CCGG 165.150 -999.990 .X. V2 2017 11 17 14 44 00 41.8100 -4.9300 850.00 845.00 5.00 434249 CIB 2017 10 11 08 40 00 1928-99 G co CCGG 164.540 -999.990 .X. V2 2017 11 17 15 00 00 41.8100 -4.9300 850.00 845.00 5.00 434250 CIB 2017 10 24 08 25 00 2334-99 G co CCGG 104.800 -999.990 P.. V2 2017 12 04 16 18 00 41.8100 -4.9300 850.00 845.00 5.00 434898 CIB 2017 10 24 08 25 00 3007-99 G co CCGG 119.960 -999.990 P.. V2 2017 12 04 16 34 00 41.8100 -4.9300 850.00 845.00 5.00 434897 CIB 2017 11 02 09 20 00 8-99 G co CCGG 120.500 -999.990 ... V2 2017 12 04 17 06 00 41.8100 -4.9300 850.00 845.00 5.00 434895 CIB 2017 11 02 09 20 00 88-99 G co CCGG 11.720 -999.990 N.. V2 2017 12 04 16 50 00 41.8100 -4.9300 850.00 845.00 5.00 434896 CIB 2017 11 09 09 15 00 4046-99 G co CCGG 131.660 -999.990 ... V2 2017 12 05 11 35 00 41.8100 -4.9300 850.00 845.00 5.00 434901 CIB 2017 11 09 09 15 00 5305-99 G co CCGG 130.760 -999.990 ... V2 2017 12 05 11 19 00 41.8100 -4.9300 850.00 845.00 5.00 434902 CIB 2017 11 15 11 50 00 1256-99 G co CCGG 122.200 -999.990 ... V2 2017 12 05 12 54 00 41.8100 -4.9300 850.00 845.00 5.00 434900 CIB 2017 11 15 11 50 00 2021-99 G co CCGG 121.710 -999.990 ... V2 2017 12 05 13 10 00 41.8100 -4.9300 850.00 845.00 5.00 434899 CIB 2017 11 22 11 45 00 3157-99 G co CCGG 105.880 -999.990 ... V2 2018 01 10 09 37 00 41.8100 -4.9300 850.00 845.00 5.00 436798 CIB 2017 11 22 11 45 00 3738-99 G co CCGG 105.720 -999.990 ... V2 2018 01 10 09 53 00 41.8100 -4.9300 850.00 845.00 5.00 436799 CIB 2017 11 30 10 50 00 1367-99 G co CCGG 125.230 -999.990 ... V2 2018 01 10 10 09 00 41.8100 -4.9300 850.00 845.00 5.00 436800 CIB 2017 11 30 10 50 00 4652-99 G co CCGG 124.620 -999.990 ... V2 2018 01 10 10 25 00 41.8100 -4.9300 850.00 845.00 5.00 436801 CIB 2017 12 05 10 45 00 3807-99 G co CCGG 120.050 -999.990 ... V2 2018 01 12 15 31 00 41.8100 -4.9300 850.00 845.00 5.00 436789 CIB 2017 12 05 10 45 00 3992-99 G co CCGG 120.360 -999.990 ... V2 2018 01 12 15 15 00 41.8100 -4.9300 850.00 845.00 5.00 436788 CIB 2017 12 12 09 45 00 1569-99 G co CCGG 137.040 -999.990 ... V2 2018 01 12 15 47 00 41.8100 -4.9300 850.00 845.00 5.00 436786 CIB 2017 12 12 09 45 00 5497-99 G co CCGG 137.010 -999.990 ... V2 2018 01 12 16 03 00 41.8100 -4.9300 850.00 845.00 5.00 436787 CIB 2017 12 21 10 30 00 1015-99 G co CCGG 99.000 -999.990 ... V2 2018 02 21 12 28 00 41.8100 -4.9300 850.00 845.00 5.00 438199 CIB 2017 12 21 10 30 00 4277-99 G co CCGG 99.610 -999.990 ... V2 2018 02 21 12 44 00 41.8100 -4.9300 850.00 845.00 5.00 438200 CIB 2018 01 08 09 55 00 3669-99 G co CCGG 123.860 -999.990 ... V2 2018 02 20 12 59 00 41.8100 -4.9300 850.00 845.00 5.00 438221 CIB 2018 01 08 09 55 00 5149-99 G co CCGG 123.110 -999.990 ... V2 2018 02 20 12 43 00 41.8100 -4.9300 850.00 845.00 5.00 438222 CIB 2018 01 17 09 45 00 4598-99 G co CCGG 126.290 -999.990 ... V2 2018 03 05 12 08 00 41.8100 -4.9300 850.00 845.00 5.00 439517 CIB 2018 01 17 09 45 00 5145-99 G co CCGG 126.150 -999.990 ... V2 2018 03 05 12 24 00 41.8100 -4.9300 850.00 845.00 5.00 439518 CIB 2018 01 24 10 10 00 2584-99 G co CCGG 117.690 -999.990 ... V2 2018 03 05 11 52 00 41.8100 -4.9300 850.00 845.00 5.00 439520 CIB 2018 01 24 10 10 00 940-99 G co CCGG 118.390 -999.990 ... V2 2018 03 05 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 439519 CIB 2018 01 31 10 50 00 3519-99 G co CCGG 125.140 -999.990 ... V2 2018 03 14 09 30 00 41.8100 -4.9300 850.00 845.00 5.00 440084 CIB 2018 01 31 10 50 00 5065-99 G co CCGG 127.650 -999.990 ... V2 2018 03 14 09 46 00 41.8100 -4.9300 850.00 845.00 5.00 440085 CIB 2018 02 14 10 05 00 2075-99 G co CCGG 130.950 -999.990 ... V2 2018 03 14 08 59 00 41.8100 -4.9300 850.00 845.00 5.00 440086 CIB 2018 02 14 10 05 00 3139-99 G co CCGG 126.200 -999.990 A.. V2 2018 03 14 09 15 00 41.8100 -4.9300 850.00 845.00 5.00 440087 CIB 2018 02 21 09 45 00 2923-99 G co CCGG 134.730 -999.990 ... V2 2018 04 06 14 11 00 41.8100 -4.9300 850.00 845.00 5.00 441092 CIB 2018 02 21 09 45 00 2924-99 G co CCGG 134.680 -999.990 ... V2 2018 04 06 14 27 00 41.8100 -4.9300 850.00 845.00 5.00 441093 CIB 2018 03 07 10 40 00 4959-99 G co CCGG 141.970 -999.990 ... V2 2018 04 06 14 43 00 41.8100 -4.9300 850.00 845.00 5.00 441094 CIB 2018 03 07 10 40 00 4960-99 G co CCGG 142.250 -999.990 ... V2 2018 04 06 14 59 00 41.8100 -4.9300 850.00 845.00 5.00 441095 CIB 2018 03 12 10 23 00 4311-99 G co CCGG 156.710 -999.990 ... V2 2018 04 03 11 10 00 41.8100 -4.9300 850.00 845.00 5.00 440884 CIB 2018 03 12 10 23 00 4312-99 G co CCGG 156.940 -999.990 ... V2 2018 04 03 11 26 00 41.8100 -4.9300 850.00 845.00 5.00 440885 CIB 2018 03 21 10 35 00 3261-99 G co CCGG 148.170 -999.990 ... V2 2018 04 03 10 38 00 41.8100 -4.9300 850.00 845.00 5.00 440882 CIB 2018 03 21 10 35 00 3262-99 G co CCGG 148.980 -999.990 ... V2 2018 04 03 10 54 00 41.8100 -4.9300 850.00 845.00 5.00 440883 CIB 2018 04 19 09 05 00 227-99 G co CCGG 124.870 -999.990 ... V2 2018 05 10 13 32 00 41.8100 -4.9300 850.00 845.00 5.00 442983 CIB 2018 04 19 09 05 00 4450-99 G co CCGG 125.260 -999.990 ... V2 2018 05 10 13 16 00 41.8100 -4.9300 850.00 845.00 5.00 442982 CIB 2018 04 26 08 45 00 1658-99 G co CCGG 124.290 -999.990 ... V2 2018 05 10 14 51 00 41.8100 -4.9300 850.00 845.00 5.00 442984 CIB 2018 04 26 08 45 00 4579-99 G co CCGG 124.650 -999.990 ... V2 2018 05 10 15 07 00 41.8100 -4.9300 850.00 845.00 5.00 442985 CIB 2018 05 02 09 30 00 1634-99 G co CCGG 133.060 -999.990 ... V2 2018 06 21 15 13 00 41.8100 -4.9300 850.00 845.00 5.00 445477 CIB 2018 05 02 09 30 00 2219-99 G co CCGG 134.000 -999.990 ... V2 2018 06 21 14 57 00 41.8100 -4.9300 850.00 845.00 5.00 445476 CIB 2018 05 09 08 45 00 2320-99 G co CCGG 123.490 -999.990 ... V2 2018 06 21 14 26 00 41.8100 -4.9300 850.00 845.00 5.00 445480 CIB 2018 05 09 08 45 00 4171-99 G co CCGG 123.290 -999.990 ... V2 2018 06 21 14 42 00 41.8100 -4.9300 850.00 845.00 5.00 445481 CIB 2018 05 16 08 20 00 4852-99 G co CCGG 120.860 -999.990 ... V2 2018 06 20 10 50 00 41.8100 -4.9300 850.00 845.00 5.00 445277 CIB 2018 05 16 08 20 00 4867-99 G co CCGG 120.460 -999.990 ... V2 2018 06 20 11 05 00 41.8100 -4.9300 850.00 845.00 5.00 445278 CIB 2018 05 25 10 00 00 240-99 G co CCGG 112.950 -999.990 ... V2 2018 06 20 10 17 00 41.8100 -4.9300 850.00 845.00 5.00 445275 CIB 2018 05 25 10 00 00 4980-99 G co CCGG 113.320 -999.990 ... V2 2018 06 20 10 33 00 41.8100 -4.9300 850.00 845.00 5.00 445276 CIB 2018 05 30 09 25 00 1786-99 G co CCGG 117.880 -999.990 ... V2 2018 06 21 16 01 00 41.8100 -4.9300 850.00 845.00 5.00 445478 CIB 2018 05 30 09 25 00 3388-99 G co CCGG 117.460 -999.990 ... V2 2018 06 21 16 16 00 41.8100 -4.9300 850.00 845.00 5.00 445479 CIB 2018 06 06 08 35 00 3217-99 G co CCGG 103.370 -999.990 ... V2 2018 06 21 15 29 00 41.8100 -4.9300 850.00 845.00 5.00 445482 CIB 2018 06 06 08 35 00 3222-99 G co CCGG 102.940 -999.990 ... V2 2018 06 21 15 45 00 41.8100 -4.9300 850.00 845.00 5.00 445483 CIB 2018 06 13 08 50 00 1-99 G co CCGG 100.100 -999.990 ... V2 2018 07 10 11 51 00 41.8100 -4.9300 850.00 845.00 5.00 446197 CIB 2018 06 13 08 50 00 1722-99 G co CCGG 99.740 -999.990 ... V2 2018 07 10 12 07 00 41.8100 -4.9300 850.00 845.00 5.00 446198 CIB 2018 06 20 08 50 00 1949-99 G co CCGG 101.080 -999.990 ... V2 2018 07 10 11 36 00 41.8100 -4.9300 850.00 845.00 5.00 446195 CIB 2018 06 20 08 50 00 4023-99 G co CCGG 101.510 -999.990 ... V2 2018 07 10 11 20 00 41.8100 -4.9300 850.00 845.00 5.00 446196 CIB 2018 06 28 09 00 00 184-99 G co CCGG 123.670 -999.990 ... V2 2018 08 13 10 55 00 41.8100 -4.9300 850.00 845.00 5.00 447221 CIB 2018 06 28 09 00 00 3233-99 G co CCGG 122.170 -999.990 ... V2 2018 08 13 11 11 00 41.8100 -4.9300 850.00 845.00 5.00 447222 CIB 2018 07 05 10 40 00 2158-99 G co CCGG 101.690 -999.990 ... V2 2018 08 13 13 17 00 41.8100 -4.9300 850.00 845.00 5.00 447223 CIB 2018 07 05 10 40 00 499-99 G co CCGG 105.740 -999.990 ... V2 2018 08 13 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 447224 CIB 2018 07 11 09 15 00 2044-99 G co CCGG 107.430 -999.990 ... V2 2018 08 09 13 17 00 41.8100 -4.9300 850.00 845.00 5.00 447217 CIB 2018 07 11 09 15 00 976-99 G co CCGG 106.960 -999.990 ... V2 2018 08 09 13 01 00 41.8100 -4.9300 850.00 845.00 5.00 447218 CIB 2018 07 19 09 10 00 1972-99 G co CCGG 118.950 -999.990 ... V2 2018 08 13 10 39 00 41.8100 -4.9300 850.00 845.00 5.00 447220 CIB 2018 07 19 09 10 00 2256-99 G co CCGG 119.060 -999.990 ... V2 2018 08 13 10 23 00 41.8100 -4.9300 850.00 845.00 5.00 447219 CIB 2018 07 26 10 30 00 3732-99 G co CCGG 130.140 -999.990 ... V2 2018 09 14 15 08 00 41.8100 -4.9300 850.00 845.00 5.00 448911 CIB 2018 07 26 10 30 00 784-99 G co CCGG 130.070 -999.990 ... V2 2018 09 14 14 53 00 41.8100 -4.9300 850.00 845.00 5.00 448912 CIB 2018 08 07 10 35 00 2246-99 G co CCGG 119.120 -999.990 ... V2 2018 09 14 14 21 00 41.8100 -4.9300 850.00 845.00 5.00 448915 CIB 2018 08 07 10 35 00 3481-99 G co CCGG 118.750 -999.990 ... V2 2018 09 14 14 37 00 41.8100 -4.9300 850.00 845.00 5.00 448916 CIB 2018 08 16 10 15 00 1663-99 G co CCGG 120.660 -999.990 ... V2 2018 09 14 15 24 00 41.8100 -4.9300 850.00 845.00 5.00 448913 CIB 2018 08 16 10 15 00 5452-99 G co CCGG 121.170 -999.990 ... V2 2018 09 14 15 40 00 41.8100 -4.9300 850.00 845.00 5.00 448914 CIB 2018 08 21 09 30 00 3474-99 G co CCGG 123.200 -999.990 ... V2 2018 09 14 16 12 00 41.8100 -4.9300 850.00 845.00 5.00 448917 CIB 2018 08 21 09 30 00 56-99 G co CCGG 124.270 -999.990 ... V2 2018 09 14 15 56 00 41.8100 -4.9300 850.00 845.00 5.00 448918 CIB 2018 09 04 10 30 00 173-99 G co CCGG 150.340 -999.990 ... V2 2018 09 27 14 19 00 41.8100 -4.9300 850.00 845.00 5.00 449590 CIB 2018 09 04 10 30 00 458-99 G co CCGG 149.280 -999.990 ... V2 2018 09 27 14 34 00 41.8100 -4.9300 850.00 845.00 5.00 449591 CIB 2018 09 14 09 45 00 152-99 G co CCGG 124.230 -999.990 ... V2 2018 09 27 14 50 00 41.8100 -4.9300 850.00 845.00 5.00 449592 CIB 2018 09 14 09 45 00 161-99 G co CCGG 124.220 -999.990 ... V2 2018 09 27 15 06 00 41.8100 -4.9300 850.00 845.00 5.00 449593 CIB 2018 09 19 09 35 00 4939-99 G co CCGG 104.050 -999.990 ... V2 2018 10 29 10 16 00 41.8100 -4.9300 850.00 845.00 5.00 450730 CIB 2018 09 19 09 35 00 5553-99 G co CCGG 105.940 -999.990 ... V2 2018 10 29 10 32 00 41.8100 -4.9300 850.00 845.00 5.00 450731 CIB 2018 09 26 08 55 00 3139-99 G co CCGG 121.240 -999.990 ... V2 2018 10 30 15 51 00 41.8100 -4.9300 850.00 845.00 5.00 450734 CIB 2018 10 03 11 00 00 1363-99 G co CCGG 115.140 -999.990 ... V2 2018 10 26 14 59 00 41.8100 -4.9300 850.00 845.00 5.00 450728 CIB 2018 10 03 11 00 00 945-99 G co CCGG 114.730 -999.990 ... V2 2018 10 26 14 43 00 41.8100 -4.9300 850.00 845.00 5.00 450729 CIB 2018 10 11 09 40 00 2027-99 G co CCGG 92.280 -999.990 N.. V2 2018 10 29 10 01 00 41.8100 -4.9300 850.00 845.00 5.00 450732 CIB 2018 10 11 09 40 00 5029-99 G co CCGG 130.930 -999.990 N.. V2 2018 10 29 09 45 00 41.8100 -4.9300 850.00 845.00 5.00 450733 CIB 2018 10 11 10 05 00 3812-99 G co CCGG 121.090 -999.990 N.. V2 2018 10 26 14 28 00 41.8100 -4.9300 850.00 845.00 5.00 450740 CIB 2018 10 11 10 05 00 4175-99 G co CCGG 120.690 -999.990 N.. V2 2018 10 26 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 450739 CIB 2018 10 11 11 20 00 516-99 G co CCGG 115.650 -999.990 ... V2 2018 10 26 13 40 00 41.8100 -4.9300 850.00 845.00 5.00 450741 CIB 2018 10 11 11 20 00 5628-99 G co CCGG 114.580 -999.990 ... V2 2018 10 26 13 56 00 41.8100 -4.9300 850.00 845.00 5.00 450742 CIB 2018 10 18 10 15 00 2032-99 G co CCGG 108.840 -999.990 ... V2 2018 12 14 14 51 00 41.8100 -4.9300 850.00 845.00 5.00 452337 CIB 2018 10 18 10 15 00 4307-99 G co CCGG 108.600 -999.990 ... V2 2018 12 14 15 07 00 41.8100 -4.9300 850.00 845.00 5.00 452338 CIB 2018 10 25 10 00 00 1540-99 G co CCGG 123.320 -999.990 ... V2 2018 12 14 16 10 00 41.8100 -4.9300 850.00 845.00 5.00 452340 CIB 2018 10 25 10 00 00 1893-99 G co CCGG 124.120 -999.990 ... V2 2018 12 14 15 55 00 41.8100 -4.9300 850.00 845.00 5.00 452339 CIB 2018 11 08 09 45 00 586-99 G co CCGG 112.300 -999.990 ... V2 2018 12 18 10 35 00 41.8100 -4.9300 850.00 845.00 5.00 452652 CIB 2018 11 08 09 45 00 826-99 G co CCGG 112.430 -999.990 ... V2 2018 12 18 10 51 00 41.8100 -4.9300 850.00 845.00 5.00 452653 CIB 2018 11 15 09 10 00 1040-99 G co CCGG 112.860 -999.990 ... V2 2018 12 18 10 19 00 41.8100 -4.9300 850.00 845.00 5.00 452654 CIB 2018 11 15 09 10 00 911-99 G co CCGG 111.970 -999.990 ... V2 2018 12 18 10 03 00 41.8100 -4.9300 850.00 845.00 5.00 452655 CIB 2018 11 21 10 10 00 4574-99 G co CCGG 122.360 -999.990 ... V2 2019 01 30 13 57 00 41.8100 -4.9300 850.00 845.00 5.00 453733 CIB 2018 11 21 10 10 00 5550-99 G co CCGG 123.800 -999.990 ... V2 2019 01 30 14 12 00 41.8100 -4.9300 850.00 845.00 5.00 453734 CIB 2018 11 28 10 45 00 4296-99 G co CCGG 125.780 -999.990 ... V2 2019 02 04 13 21 00 41.8100 -4.9300 850.00 845.00 5.00 453642 CIB 2018 11 28 10 45 00 4541-99 G co CCGG 126.300 -999.990 ... V2 2019 02 04 13 37 00 41.8100 -4.9300 850.00 845.00 5.00 453643 CIB 2018 12 05 10 05 00 177-99 G co CCGG 115.620 -999.990 ... V2 2019 02 04 12 18 00 41.8100 -4.9300 850.00 845.00 5.00 453638 CIB 2018 12 05 10 05 00 377-99 G co CCGG 116.130 -999.990 ... V2 2019 02 04 12 33 00 41.8100 -4.9300 850.00 845.00 5.00 453639 CIB 2018 12 13 10 35 00 1085-99 G co CCGG 114.630 -999.990 ... V2 2019 02 04 12 49 00 41.8100 -4.9300 850.00 845.00 5.00 453640 CIB 2018 12 13 10 35 00 5601-99 G co CCGG 114.980 -999.990 ... V2 2019 02 04 13 05 00 41.8100 -4.9300 850.00 845.00 5.00 453641 CIB 2019 01 17 11 00 00 3289-99 G co CCGG 134.030 -999.990 ... V2 2019 03 07 16 33 00 41.8100 -4.9300 850.00 845.00 5.00 455233 CIB 2019 01 17 11 00 00 3611-99 G co CCGG 134.690 -999.990 ... V2 2019 03 07 16 49 00 41.8100 -4.9300 850.00 845.00 5.00 455234 CIB 2019 01 22 10 10 00 2590-99 G co CCGG 133.940 -999.990 ... V2 2019 03 08 09 38 00 41.8100 -4.9300 850.00 845.00 5.00 455231 CIB 2019 01 22 10 10 00 3959-99 G co CCGG 133.210 -999.990 ... V2 2019 03 08 09 54 00 41.8100 -4.9300 850.00 845.00 5.00 455232 CIB 2019 01 29 10 10 00 1328-99 G co CCGG 126.130 -999.990 ... V2 2019 03 19 09 40 00 41.8100 -4.9300 850.00 845.00 5.00 455759 CIB 2019 01 29 10 10 00 3341-99 G co CCGG 125.470 -999.990 ... V2 2019 03 19 09 56 00 41.8100 -4.9300 850.00 845.00 5.00 455760 CIB 2019 02 14 10 00 00 4744-99 G co CCGG 140.510 -999.990 ... V2 2019 03 19 10 11 00 41.8100 -4.9300 850.00 845.00 5.00 455761 CIB 2019 02 14 10 00 00 5188-99 G co CCGG 141.670 -999.990 ... V2 2019 03 19 10 27 00 41.8100 -4.9300 850.00 845.00 5.00 455762 CIB 2019 02 21 09 00 00 3366-99 G co CCGG 123.740 -999.990 ... V2 2019 03 18 16 45 00 41.8100 -4.9300 850.00 845.00 5.00 455755 CIB 2019 02 21 09 00 00 726-99 G co CCGG 123.950 -999.990 ... V2 2019 03 18 16 29 00 41.8100 -4.9300 850.00 845.00 5.00 455756 CIB 2019 02 28 10 30 00 2348-99 G co CCGG 152.640 -999.990 ... V2 2019 03 18 17 01 00 41.8100 -4.9300 850.00 845.00 5.00 455757 CIB 2019 02 28 10 30 00 2632-99 G co CCGG 151.590 -999.990 ... V2 2019 03 18 17 17 00 41.8100 -4.9300 850.00 845.00 5.00 455758 CIB 2019 03 13 09 30 00 4920-99 G co CCGG 130.110 -999.990 ... V2 2019 04 25 15 47 00 41.8100 -4.9300 850.00 845.00 5.00 457236 CIB 2019 03 13 09 30 00 5255-99 G co CCGG 129.710 -999.990 ... V2 2019 04 25 16 02 00 41.8100 -4.9300 850.00 845.00 5.00 457237 CIB 2019 03 20 10 10 00 3822-99 G co CCGG 127.240 -999.990 ... V2 2019 04 26 09 55 00 41.8100 -4.9300 850.00 845.00 5.00 457238 CIB 2019 03 20 10 10 00 4706-99 G co CCGG 128.490 -999.990 ... V2 2019 04 26 10 11 00 41.8100 -4.9300 850.00 845.00 5.00 457239 CIB 2019 03 28 11 00 00 3963-99 G co CCGG 150.000 -999.990 ... V2 2019 04 30 13 40 00 41.8100 -4.9300 850.00 845.00 5.00 457150 CIB 2019 03 28 11 00 00 3964-99 G co CCGG 148.910 -999.990 ... V2 2019 04 30 13 56 00 41.8100 -4.9300 850.00 845.00 5.00 457151 CIB 2019 04 02 09 35 00 3885-99 G co CCGG 135.760 -999.990 ... V2 2019 04 30 13 08 00 41.8100 -4.9300 850.00 845.00 5.00 457148 CIB 2019 04 02 09 35 00 3886-99 G co CCGG 135.760 -999.990 ... V2 2019 04 30 13 24 00 41.8100 -4.9300 850.00 845.00 5.00 457149 CIB 2019 04 12 10 15 00 3303-99 G co CCGG 148.630 -999.990 ... V2 2019 05 20 11 42 00 41.8100 -4.9300 850.00 845.00 5.00 458663 CIB 2019 04 12 10 15 00 3304-99 G co CCGG 150.340 -999.990 ... V2 2019 05 20 11 58 00 41.8100 -4.9300 850.00 845.00 5.00 458664 CIB 2019 04 25 11 35 00 5411-99 G co CCGG 126.320 -999.990 ... V2 2019 05 20 11 11 00 41.8100 -4.9300 850.00 845.00 5.00 458661 CIB 2019 04 25 11 35 00 5412-99 G co CCGG 125.940 -999.990 ... V2 2019 05 20 11 26 00 41.8100 -4.9300 850.00 845.00 5.00 458662 CIB 2019 05 09 08 45 00 3235-99 G co CCGG 100.970 -999.990 ... V2 2019 06 11 12 38 00 41.8100 -4.9300 850.00 845.00 5.00 459529 CIB 2019 05 09 08 45 00 4512-99 G co CCGG 101.520 -999.990 ... V2 2019 06 11 12 53 00 41.8100 -4.9300 850.00 845.00 5.00 459530 CIB 2019 05 15 08 10 00 1049-99 G co CCGG 115.960 -999.990 ... V2 2019 06 11 12 22 00 41.8100 -4.9300 850.00 845.00 5.00 459532 CIB 2019 05 15 08 10 00 2553-99 G co CCGG 116.620 -999.990 ... V2 2019 06 11 12 06 00 41.8100 -4.9300 850.00 845.00 5.00 459531 CIB 2019 05 22 07 30 00 5106-99 G co CCGG 120.900 -999.990 ... V2 2019 07 01 14 33 00 41.8100 -4.9300 850.00 845.00 5.00 460429 CIB 2019 05 22 07 30 00 5592-99 G co CCGG 121.080 -999.990 ... V2 2019 07 01 14 49 00 41.8100 -4.9300 850.00 845.00 5.00 460430 CIB 2019 05 30 07 30 00 3805-99 G co CCGG 88.740 -999.990 ... V2 2019 07 01 15 05 00 41.8100 -4.9300 850.00 845.00 5.00 460427 CIB 2019 05 30 07 30 00 4431-99 G co CCGG 88.550 -999.990 ... V2 2019 07 01 15 20 00 41.8100 -4.9300 850.00 845.00 5.00 460428 CIB 2019 06 05 07 30 00 4875-99 G co CCGG 101.410 -999.990 ... V2 2019 07 02 15 13 00 41.8100 -4.9300 850.00 845.00 5.00 460425 CIB 2019 06 05 07 30 00 5216-99 G co CCGG 101.760 -999.990 ... V2 2019 07 02 15 29 00 41.8100 -4.9300 850.00 845.00 5.00 460426 CIB 2019 06 12 07 50 00 1645-99 G co CCGG 97.440 -999.990 ... V2 2019 07 02 14 41 00 41.8100 -4.9300 850.00 845.00 5.00 460423 CIB 2019 06 12 07 50 00 4616-99 G co CCGG 97.430 -999.990 ... V2 2019 07 02 14 57 00 41.8100 -4.9300 850.00 845.00 5.00 460424 CIB 2019 06 20 08 00 00 1870-99 G co CCGG 107.430 -999.990 ... V2 2019 07 22 15 18 00 41.8100 -4.9300 850.00 845.00 5.00 461672 CIB 2019 06 20 08 00 00 2324-99 G co CCGG 107.250 -999.990 ... V2 2019 07 22 15 33 00 41.8100 -4.9300 850.00 845.00 5.00 461673 CIB 2019 06 26 09 45 00 4797-99 G co CCGG 106.550 -999.990 ... V2 2019 07 22 16 05 00 41.8100 -4.9300 850.00 845.00 5.00 461667 CIB 2019 06 26 09 45 00 915-99 G co CCGG 106.060 -999.990 ... V2 2019 07 22 15 49 00 41.8100 -4.9300 850.00 845.00 5.00 461666 CIB 2019 07 03 11 30 00 3201-99 G co CCGG 124.280 -999.990 ... AR2 2019 08 12 12 55 41 41.8100 -4.9300 850.00 845.00 5.00 462961 CIB 2019 07 03 11 30 00 5499-99 G co CCGG 123.920 -999.990 ... AR2 2019 08 12 13 09 59 41.8100 -4.9300 850.00 845.00 5.00 462962 CIB 2019 07 10 08 20 00 2692-99 G co CCGG 105.050 -999.990 ... AR2 2019 08 12 12 27 04 41.8100 -4.9300 850.00 845.00 5.00 462975 CIB 2019 07 10 08 20 00 5107-99 G co CCGG 105.230 -999.990 ... AR2 2019 08 12 12 41 22 41.8100 -4.9300 850.00 845.00 5.00 462976 CIB 2019 07 17 07 40 00 4158-99 G co CCGG 107.500 -999.990 ... AR2 2019 08 12 15 47 26 41.8100 -4.9300 850.00 845.00 5.00 462955 CIB 2019 07 17 07 40 00 4952-99 G co CCGG 107.560 -999.990 ... AR2 2019 08 12 16 01 47 41.8100 -4.9300 850.00 845.00 5.00 462956 CIB 2019 07 24 09 00 00 4767-99 G co CCGG 122.120 -999.990 ... AR2 2019 08 12 15 18 52 41.8100 -4.9300 850.00 845.00 5.00 462958 CIB 2019 07 24 09 00 00 5652-99 G co CCGG 120.750 -999.990 ... AR2 2019 08 12 15 33 07 41.8100 -4.9300 850.00 845.00 5.00 462957 CIB 2019 07 31 07 30 00 2739-99 G co CCGG 102.010 -999.990 ... AR2 2019 10 01 13 09 13 41.8100 -4.9300 850.00 845.00 5.00 465349 CIB 2019 07 31 07 30 00 4017-99 G co CCGG 102.120 -999.990 ... AR2 2019 10 01 13 23 35 41.8100 -4.9300 850.00 845.00 5.00 465350 CIB 2019 08 16 09 15 00 1098-99 G co CCGG 125.450 -999.990 ... AR2 2019 10 03 10 59 01 41.8100 -4.9300 850.00 845.00 5.00 465196 CIB 2019 08 16 09 15 00 1926-99 G co CCGG 125.220 -999.990 ... AR2 2019 10 03 11 13 25 41.8100 -4.9300 850.00 845.00 5.00 465197 CIB 2019 08 20 07 35 00 1185-99 G co CCGG 129.890 -999.990 ... AR2 2019 10 03 11 27 46 41.8100 -4.9300 850.00 845.00 5.00 465200 CIB 2019 08 20 07 35 00 5106-99 G co CCGG 129.680 -999.990 ... AR2 2019 10 03 11 42 11 41.8100 -4.9300 850.00 845.00 5.00 465201 CIB 2019 08 22 09 10 00 1645-99 G co CCGG 131.020 -999.990 ... AR2 2019 10 03 11 56 36 41.8100 -4.9300 850.00 845.00 5.00 465198 CIB 2019 08 22 09 10 00 3718-99 G co CCGG 131.260 -999.990 ... AR2 2019 10 03 12 10 59 41.8100 -4.9300 850.00 845.00 5.00 465199 CIB 2019 09 04 07 40 00 1073-99 G co CCGG 122.030 -999.990 ... AR2 2019 10 24 13 00 02 41.8100 -4.9300 850.00 845.00 5.00 466377 CIB 2019 09 04 07 40 00 2384-99 G co CCGG 122.660 -999.990 ... AR2 2019 10 24 13 14 21 41.8100 -4.9300 850.00 845.00 5.00 466378 CIB 2019 09 18 08 10 00 3593-99 G co CCGG 99.420 -999.990 ... AR2 2019 10 24 12 31 22 41.8100 -4.9300 850.00 845.00 5.00 466379 CIB 2019 09 18 08 10 00 5278-99 G co CCGG 99.150 -999.990 ... AR2 2019 10 24 12 45 42 41.8100 -4.9300 850.00 845.00 5.00 466380 CIB 2019 09 25 07 30 00 1755-99 G co CCGG 111.310 -999.990 ... AR2 2019 11 08 13 00 41 41.8100 -4.9300 850.00 845.00 5.00 466754 CIB 2019 09 25 07 30 00 926-99 G co CCGG 111.340 -999.990 ... AR2 2019 11 08 12 46 21 41.8100 -4.9300 850.00 845.00 5.00 466753 CIB 2019 10 03 07 20 00 1044-99 G co CCGG 107.040 -999.990 ... AR2 2019 11 08 12 31 55 41.8100 -4.9300 850.00 845.00 5.00 466756 CIB 2019 10 03 07 20 00 411-99 G co CCGG 106.920 -999.990 ... AR2 2019 11 08 12 17 37 41.8100 -4.9300 850.00 845.00 5.00 466755 CIB 2019 10 10 07 45 00 3727-99 G co CCGG 109.520 -999.990 ... AR2 2019 11 22 14 20 15 41.8100 -4.9300 850.00 845.00 5.00 467609 CIB 2019 10 10 07 45 00 4963-99 G co CCGG 109.540 -999.990 ... AR2 2019 11 22 14 34 35 41.8100 -4.9300 850.00 845.00 5.00 467608 CIB 2019 10 16 07 50 00 1193-99 G co CCGG 111.610 -999.990 ... AR2 2019 11 22 10 17 11 41.8100 -4.9300 850.00 845.00 5.00 467566 CIB 2019 10 16 07 50 00 798-99 G co CCGG 111.800 -999.990 ... AR2 2019 11 22 10 02 58 41.8100 -4.9300 850.00 845.00 5.00 467565 CIB 2019 10 24 08 10 00 2862-99 G co CCGG 119.370 -999.990 ... AR2 2019 12 31 11 34 31 41.8100 -4.9300 850.00 845.00 5.00 468391 CIB 2019 10 24 08 10 00 476-99 G co CCGG 119.310 -999.990 ... AR2 2019 12 31 11 20 14 41.8100 -4.9300 850.00 845.00 5.00 468390 CIB 2019 10 30 09 00 00 2346-99 G co CCGG 121.290 -999.990 ... AR2 2019 12 31 11 05 57 41.8100 -4.9300 850.00 845.00 5.00 468393 CIB 2019 10 30 09 00 00 827-99 G co CCGG 121.130 -999.990 ... AR2 2019 12 31 10 51 41 41.8100 -4.9300 850.00 845.00 5.00 468392 CIB 2019 11 07 09 05 00 3283-99 G co CCGG 104.390 -999.990 ... AR2 2019 12 31 12 31 41 41.8100 -4.9300 850.00 845.00 5.00 468395 CIB 2019 11 07 09 05 00 704-99 G co CCGG 104.490 -999.990 ... AR2 2019 12 31 12 17 24 41.8100 -4.9300 850.00 845.00 5.00 468394 CIB 2019 11 13 08 20 00 1579-99 G co CCGG 106.120 -999.990 ... AR2 2019 12 31 12 03 06 41.8100 -4.9300 850.00 845.00 5.00 468397 CIB 2019 11 13 08 20 00 828-99 G co CCGG 106.340 -999.990 ... AR2 2019 12 31 11 48 49 41.8100 -4.9300 850.00 845.00 5.00 468396 CIB 2019 11 27 09 15 00 2109-99 G co CCGG 137.590 -999.990 ... AR2 2020 01 23 12 17 43 41.8100 -4.9300 850.00 845.00 5.00 469012 CIB 2019 11 27 09 15 00 606-99 G co CCGG 137.490 -999.990 ... AR2 2020 01 23 12 03 22 41.8100 -4.9300 850.00 845.00 5.00 469013 CIB 2019 12 04 08 35 00 2859-99 G co CCGG 135.840 -999.990 ... AR2 2020 01 24 10 27 46 41.8100 -4.9300 850.00 845.00 5.00 468990 CIB 2019 12 04 08 35 00 5539-99 G co CCGG 135.770 -999.990 ... AR2 2020 01 24 10 42 07 41.8100 -4.9300 850.00 845.00 5.00 468991 CIB 2019 12 11 09 00 00 2058-99 G co CCGG 154.460 -999.990 ... AR2 2020 03 05 09 41 20 41.8100 -4.9300 850.00 845.00 5.00 471202 CIB 2019 12 11 09 00 00 3043-99 G co CCGG 154.790 -999.990 ... AR2 2020 03 05 09 55 39 41.8100 -4.9300 850.00 845.00 5.00 471203