# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that ESRL receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: ESRL should be informed at the outset of the nature of this work. # comment: If the ESRL data are essential to the work, or if an important # comment: result or conclusion depends on the ESRL data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the ESRL data should be sent to ESRL # comment: for review before they are submitted for publication so we can # comment: insure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CH4C13 SIL (Individual Flasks) # contact_name: Bruce H Vaughn # contact_telephone: (303) 492-7985 # contact_email: Bruce.Vaughn@colorado.edu # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: National Institute of Water and Atmospheric # collaborator_name: Research [NIWA] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the ESRL data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: bhd # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: date:1900-01-01,2017-12-31 # description_creation-time: 2018-09-24 14:37:44 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number BHD 2009 03 22 23 37 00 5017-99 N ch4c13 SIL -46.970 0.043 ... i1 2010 04 05 00 06 00 -41.4083 174.8710 90.00 80.00 10.00 283167 BHD 2009 03 22 23 37 00 5018-99 N ch4c13 SIL -46.956 0.043 ... i1 2010 04 05 00 23 00 -41.4083 174.8710 90.00 80.00 10.00 283168 BHD 2009 04 01 00 36 00 5007-99 N ch4c13 SIL -46.785 0.055 ... i1 2010 01 22 19 59 00 -41.4083 174.8710 90.00 80.00 10.00 283165 BHD 2009 04 01 00 36 00 5007-99 N ch4c13 SIL -46.894 -999.990 ... i1 2010 01 23 05 22 00 -41.4083 174.8710 90.00 80.00 10.00 283165 BHD 2009 04 01 00 36 00 5008-99 N ch4c13 SIL -46.793 0.055 ... i1 2010 01 22 20 19 00 -41.4083 174.8710 90.00 80.00 10.00 283166 BHD 2009 04 01 00 36 00 5008-99 N ch4c13 SIL -46.890 -999.990 ... i1 2010 01 23 05 42 00 -41.4083 174.8710 90.00 80.00 10.00 283166 BHD 2009 04 20 02 40 00 3409-99 N ch4c13 SIL -47.278 0.046 ... i1 2010 04 02 23 00 00 -41.4083 174.8710 90.00 80.00 10.00 283175 BHD 2009 04 20 02 40 00 3409-99 N ch4c13 SIL -47.018 0.042 ... i1 2010 04 04 02 26 00 -41.4083 174.8710 90.00 80.00 10.00 283175 BHD 2009 04 20 02 40 00 3410-99 N ch4c13 SIL -47.350 0.046 .X. i1 2010 04 02 23 18 00 -41.4083 174.8710 90.00 80.00 10.00 283176 BHD 2009 04 20 02 40 00 3410-99 N ch4c13 SIL -46.908 0.042 P.. i1 2010 04 04 02 44 00 -41.4083 174.8710 90.00 80.00 10.00 283176 BHD 2009 04 30 01 32 00 4537-99 N ch4c13 SIL -47.176 0.046 ... i1 2010 04 02 23 35 00 -41.4083 174.8710 90.00 80.00 10.00 283169 BHD 2009 04 30 01 32 00 4537-99 N ch4c13 SIL -47.057 0.042 ... i1 2010 04 04 01 51 00 -41.4083 174.8710 90.00 80.00 10.00 283169 BHD 2009 04 30 01 32 00 4538-99 N ch4c13 SIL -47.225 0.046 ... i1 2010 04 02 23 53 00 -41.4083 174.8710 90.00 80.00 10.00 283170 BHD 2009 04 30 01 32 00 4538-99 N ch4c13 SIL -47.035 0.042 ... i1 2010 04 04 02 08 00 -41.4083 174.8710 90.00 80.00 10.00 283170 BHD 2009 05 19 23 01 00 2701-99 N ch4c13 SIL -47.031 0.043 ... i1 2010 04 04 22 20 00 -41.4083 174.8710 90.00 80.00 10.00 283163 BHD 2009 05 19 23 01 00 2702-99 N ch4c13 SIL -47.010 0.043 ... i1 2010 04 04 22 37 00 -41.4083 174.8710 90.00 80.00 10.00 283164 BHD 2009 06 10 23 03 00 2451-99 N ch4c13 SIL -47.745 0.046 -.. i1 2010 04 02 22 25 00 -41.4083 174.8710 90.00 80.00 10.00 283171 BHD 2009 06 10 23 03 00 2451-99 N ch4c13 SIL -47.239 0.042 ... i1 2010 04 04 03 02 00 -41.4083 174.8710 90.00 80.00 10.00 283171 BHD 2009 06 10 23 03 00 2452-99 N ch4c13 SIL -47.250 0.046 P.. i1 2010 04 02 22 42 00 -41.4083 174.8710 90.00 80.00 10.00 283172 BHD 2009 06 10 23 03 00 2452-99 N ch4c13 SIL -47.209 0.042 ... i1 2010 04 04 03 19 00 -41.4083 174.8710 90.00 80.00 10.00 283172 BHD 2009 06 16 07 52 00 2727-99 N ch4c13 SIL -47.130 0.039 n.. i1 2010 01 07 18 53 00 -41.4083 174.8710 90.00 80.00 10.00 283173 BHD 2009 06 16 07 52 00 2728-99 N ch4c13 SIL -47.007 0.039 ... i1 2010 01 07 19 14 00 -41.4083 174.8710 90.00 80.00 10.00 283174 BHD 2009 07 08 03 49 00 397-99 N ch4c13 SIL -47.029 0.040 ... i1 2010 02 22 22 05 00 -41.4083 174.8710 90.00 80.00 10.00 287612 BHD 2009 07 08 03 49 00 398-99 N ch4c13 SIL -47.016 0.040 ... i1 2010 02 22 22 23 00 -41.4083 174.8710 90.00 80.00 10.00 287613 BHD 2009 07 17 00 29 00 401-99 N ch4c13 SIL -47.107 0.046 ... i1 2010 02 05 15 55 00 -41.4083 174.8710 90.00 80.00 10.00 287614 BHD 2009 07 17 00 29 00 402-99 N ch4c13 SIL -47.043 0.046 ... i1 2010 02 05 16 13 00 -41.4083 174.8710 90.00 80.00 10.00 287615 BHD 2009 08 05 23 30 00 4235-99 N ch4c13 SIL -47.150 0.056 ... i1 2010 01 21 06 36 00 -41.4083 174.8710 90.00 80.00 10.00 287620 BHD 2009 08 05 23 30 00 4236-99 N ch4c13 SIL -47.146 0.056 ... i1 2010 01 21 06 56 00 -41.4083 174.8710 90.00 80.00 10.00 287621 BHD 2009 08 18 23 46 00 3355-99 N ch4c13 SIL -47.093 0.040 ... i1 2010 02 22 17 09 00 -41.4083 174.8710 90.00 80.00 10.00 287622 BHD 2009 08 18 23 46 00 3356-99 N ch4c13 SIL -47.121 0.040 ... i1 2010 02 22 17 27 00 -41.4083 174.8710 90.00 80.00 10.00 287623 BHD 2009 09 15 06 09 00 3110-99 N ch4c13 SIL -47.132 0.086 ..S i1 2010 10 18 18 40 00 -41.4083 174.8710 90.00 80.00 10.00 294123 BHD 2009 09 24 01 18 00 1806-99 N ch4c13 SIL -47.181 0.086 ..S i1 2010 10 18 18 57 00 -41.4083 174.8710 90.00 80.00 10.00 294125 BHD 2009 10 19 20 36 00 1610-99 N ch4c13 SIL -47.184 0.086 ..S i1 2010 10 18 18 06 00 -41.4083 174.8710 90.00 80.00 10.00 294119 BHD 2009 10 29 14 37 00 1466-99 N ch4c13 SIL -47.160 0.086 ..S i1 2010 10 18 18 23 00 -41.4083 174.8710 90.00 80.00 10.00 294121 BHD 2010 03 08 23 32 00 2119-99 N ch4c13 SIL -47.209 -0.009 Dxo i1 2010 10 19 14 26 00 -41.4083 174.8710 90.00 80.00 10.00 300733 BHD 2010 03 08 23 32 00 2120-99 N ch4c13 SIL -47.129 -0.009 Dxo i1 2010 10 19 14 44 00 -41.4083 174.8710 90.00 80.00 10.00 300734 BHD 2010 03 17 05 44 00 3113-99 N ch4c13 SIL -46.866 -0.009 D.o i1 2010 10 19 13 52 00 -41.4083 174.8710 90.00 80.00 10.00 300735 BHD 2010 03 17 05 44 00 3114-99 N ch4c13 SIL -46.806 -0.009 D.o i1 2010 10 19 14 09 00 -41.4083 174.8710 90.00 80.00 10.00 300736 BHD 2010 04 04 05 20 00 4035-99 N ch4c13 SIL -46.881 3.171 ... i1 2010 12 06 15 21 00 -41.4083 174.8710 90.00 80.00 10.00 300693 BHD 2010 04 04 05 20 00 4036-99 N ch4c13 SIL -46.955 3.171 ... i1 2010 12 06 15 36 00 -41.4083 174.8710 90.00 80.00 10.00 300694 BHD 2010 04 16 01 16 00 143-99 N ch4c13 SIL -47.055 0.093 D.. i1 2010 11 30 22 08 00 -41.4083 174.8710 90.00 80.00 10.00 300695 BHD 2010 04 16 01 16 00 144-99 N ch4c13 SIL -46.913 0.093 D.. i1 2010 11 30 22 23 00 -41.4083 174.8710 90.00 80.00 10.00 300696 BHD 2010 05 04 00 28 00 399-99 N ch4c13 SIL -47.062 0.098 ... i1 2011 02 16 15 13 00 -41.4083 174.8710 90.00 80.00 10.00 312008 BHD 2010 05 04 00 28 00 400-99 N ch4c13 SIL -47.145 0.098 ... i1 2011 02 16 15 27 00 -41.4083 174.8710 90.00 80.00 10.00 312009 BHD 2010 05 19 23 21 00 3703-99 N ch4c13 SIL -47.078 0.098 ... i1 2011 02 16 15 42 00 -41.4083 174.8710 90.00 80.00 10.00 312010 BHD 2010 05 19 23 21 00 3704-99 N ch4c13 SIL -47.101 0.098 ... i1 2011 02 16 15 57 00 -41.4083 174.8710 90.00 80.00 10.00 312011 BHD 2010 06 15 00 29 00 3477-99 N ch4c13 SIL -47.213 0.097 ... i1 2011 02 14 22 46 00 -41.4083 174.8710 90.00 80.00 10.00 312021 BHD 2010 06 15 00 29 00 3478-99 N ch4c13 SIL -47.197 0.097 ... i1 2011 02 14 23 01 00 -41.4083 174.8710 90.00 80.00 10.00 312020 BHD 2010 07 06 21 26 00 1359-99 N ch4c13 SIL -47.204 0.097 ... i1 2011 02 14 22 16 00 -41.4083 174.8710 90.00 80.00 10.00 312025 BHD 2010 07 06 21 26 00 1360-99 N ch4c13 SIL -47.153 0.097 ... i1 2011 02 14 22 31 00 -41.4083 174.8710 90.00 80.00 10.00 312024 BHD 2010 07 19 23 38 00 1519-99 N ch4c13 SIL -47.205 0.101 ... i1 2011 02 10 23 43 00 -41.4083 174.8710 90.00 80.00 10.00 312028 BHD 2010 07 19 23 38 00 1520-99 N ch4c13 SIL -47.149 0.101 ... i1 2011 02 10 23 58 00 -41.4083 174.8710 90.00 80.00 10.00 312029 BHD 2010 08 05 03 57 00 2827-99 N ch4c13 SIL -47.407 0.101 ... i1 2011 02 10 23 13 00 -41.4083 174.8710 90.00 80.00 10.00 312030 BHD 2010 08 05 03 57 00 2828-99 N ch4c13 SIL -47.398 0.101 ... i1 2011 02 10 23 28 00 -41.4083 174.8710 90.00 80.00 10.00 312031 BHD 2010 08 24 01 01 00 965-99 N ch4c13 SIL -47.166 0.097 ... i1 2011 02 15 18 43 00 -41.4083 174.8710 90.00 80.00 10.00 312012 BHD 2010 08 24 01 01 00 966-99 N ch4c13 SIL -47.075 0.097 ... i1 2011 02 15 18 58 00 -41.4083 174.8710 90.00 80.00 10.00 312013 BHD 2010 08 30 08 02 00 1787-99 N ch4c13 SIL -47.413 0.097 A.. i1 2011 02 16 01 55 00 -41.4083 174.8710 90.00 80.00 10.00 312014 BHD 2010 08 30 08 02 00 1788-99 N ch4c13 SIL -47.437 0.097 A.. i1 2011 02 16 02 10 00 -41.4083 174.8710 90.00 80.00 10.00 312015 BHD 2010 09 14 22 14 00 3471-99 N ch4c13 SIL -47.148 0.097 ... i1 2011 02 14 18 03 00 -41.4083 174.8710 90.00 80.00 10.00 312026 BHD 2010 09 14 22 14 00 3472-99 N ch4c13 SIL -47.221 0.097 ... i1 2011 02 14 18 18 00 -41.4083 174.8710 90.00 80.00 10.00 312027 BHD 2010 10 11 02 50 00 3435-99 N ch4c13 SIL -47.059 0.097 ... i1 2011 02 14 18 33 00 -41.4083 174.8710 90.00 80.00 10.00 312022 BHD 2010 10 11 02 50 00 3436-99 N ch4c13 SIL -47.074 0.097 ... i1 2011 02 14 18 47 00 -41.4083 174.8710 90.00 80.00 10.00 312023 BHD 2010 11 20 14 59 00 747-99 N ch4c13 SIL -47.059 0.069 ... i1 2011 08 01 20 42 00 -41.4083 174.8710 90.00 80.00 10.00 319984 BHD 2010 11 20 14 59 00 748-99 N ch4c13 SIL -47.077 0.069 ... i1 2011 08 01 20 56 00 -41.4083 174.8710 90.00 80.00 10.00 319985 BHD 2010 12 08 03 30 00 3819-99 N ch4c13 SIL -46.983 0.097 ..T i1 2011 07 26 19 34 00 -41.4083 174.8710 90.00 80.00 10.00 319987 BHD 2010 12 08 03 30 00 3820-99 N ch4c13 SIL -46.913 0.097 ..T i1 2011 07 26 19 48 00 -41.4083 174.8710 90.00 80.00 10.00 319986 BHD 2011 01 10 00 31 00 2353-99 N ch4c13 SIL -47.021 0.068 ... i1 2011 07 19 15 16 00 -41.4083 174.8710 90.00 80.00 10.00 320010 BHD 2011 01 10 00 31 00 2354-99 N ch4c13 SIL -46.989 0.068 ... i1 2011 07 19 15 31 00 -41.4083 174.8710 90.00 80.00 10.00 320011 BHD 2011 02 07 07 25 00 3865-99 N ch4c13 SIL -47.076 0.068 ... i1 2011 07 19 15 45 00 -41.4083 174.8710 90.00 80.00 10.00 320008 BHD 2011 02 07 07 25 00 3866-99 N ch4c13 SIL -47.051 0.068 ... i1 2011 07 19 16 00 00 -41.4083 174.8710 90.00 80.00 10.00 320009 BHD 2011 03 07 06 23 00 1341-99 N ch4c13 SIL -46.880 0.066 ... i1 2011 07 20 22 44 00 -41.4083 174.8710 90.00 80.00 10.00 320006 BHD 2011 03 07 06 23 00 1342-99 N ch4c13 SIL -46.989 0.066 ... i1 2011 07 20 22 59 00 -41.4083 174.8710 90.00 80.00 10.00 320007 BHD 2011 03 22 23 55 00 371-99 N ch4c13 SIL -47.056 0.069 ... i1 2011 08 01 22 10 00 -41.4083 174.8710 90.00 80.00 10.00 319990 BHD 2011 03 22 23 55 00 372-99 N ch4c13 SIL -46.950 0.069 ... i1 2011 08 01 22 24 00 -41.4083 174.8710 90.00 80.00 10.00 319991 BHD 2011 04 06 01 20 00 381-99 N ch4c13 SIL -47.056 0.069 ... i1 2011 08 01 21 40 00 -41.4083 174.8710 90.00 80.00 10.00 319988 BHD 2011 04 06 01 20 00 382-99 N ch4c13 SIL -47.144 0.069 ... i1 2011 08 01 21 55 00 -41.4083 174.8710 90.00 80.00 10.00 319989 BHD 2011 05 06 21 12 00 6233-66 N ch4c13 SIL -47.574 0.143 n.. i1 2012 11 14 01 25 00 -41.4083 174.8710 90.00 80.00 10.00 328782 BHD 2011 05 06 21 12 00 6234-66 N ch4c13 SIL -47.509 0.143 n.. i1 2012 11 14 01 40 00 -41.4083 174.8710 90.00 80.00 10.00 328783 BHD 2011 05 17 16 38 00 2187-99 N ch4c13 SIL -47.348 0.071 ... i1 2013 03 25 19 56 00 -41.4083 174.8710 90.00 80.00 10.00 328784 BHD 2011 05 17 16 38 00 2188-99 N ch4c13 SIL -47.242 0.071 ... i1 2013 03 25 20 12 00 -41.4083 174.8710 90.00 80.00 10.00 328785 BHD 2011 06 01 02 15 00 5027-99 N ch4c13 SIL -47.225 0.066 ... i1 2012 11 20 14 46 00 -41.4083 174.8710 90.00 80.00 10.00 328790 BHD 2011 06 01 02 15 00 5028-99 N ch4c13 SIL -47.088 0.066 ... i1 2012 11 20 15 01 00 -41.4083 174.8710 90.00 80.00 10.00 328791 BHD 2011 06 21 00 10 00 2871-99 N ch4c13 SIL -47.192 0.066 ... i1 2012 11 20 14 16 00 -41.4083 174.8710 90.00 80.00 10.00 328793 BHD 2011 06 21 00 10 00 2872-99 N ch4c13 SIL -47.247 0.066 ... i1 2012 11 20 14 31 00 -41.4083 174.8710 90.00 80.00 10.00 328792 BHD 2011 07 15 04 20 00 3943-99 N ch4c13 SIL -47.165 0.143 ... i1 2012 11 13 20 06 00 -41.4083 174.8710 90.00 80.00 10.00 328786 BHD 2011 07 15 04 20 00 3944-99 N ch4c13 SIL -47.132 0.143 ... i1 2012 11 13 20 21 00 -41.4083 174.8710 90.00 80.00 10.00 328787 BHD 2011 07 25 02 51 00 4599-99 N ch4c13 SIL -47.221 0.096 ... i1 2012 02 13 16 18 00 -41.4083 174.8710 90.00 80.00 10.00 328788 BHD 2011 07 25 02 51 00 4600-99 N ch4c13 SIL -47.275 0.096 ... i1 2012 02 13 16 32 00 -41.4083 174.8710 90.00 80.00 10.00 328789 BHD 2011 09 13 21 32 00 1083-99 N ch4c13 SIL -47.215 0.070 ... i1 2013 04 01 17 14 00 -41.4083 174.8710 90.00 80.00 10.00 328794 BHD 2011 09 13 21 32 00 1084-99 N ch4c13 SIL -47.199 0.070 ... i1 2013 04 01 17 30 00 -41.4083 174.8710 90.00 80.00 10.00 328795 BHD 2011 10 05 00 42 00 4065-99 N ch4c13 SIL -47.212 0.070 ... i1 2013 04 02 00 01 00 -41.4083 174.8710 90.00 80.00 10.00 328796 BHD 2011 10 05 00 42 00 4066-99 N ch4c13 SIL -47.283 0.070 ... i1 2013 04 02 00 17 00 -41.4083 174.8710 90.00 80.00 10.00 328797 BHD 2011 11 10 04 26 00 2013-99 N ch4c13 SIL -47.079 0.062 ... i1 2012 12 31 22 40 00 -41.4083 174.8710 90.00 80.00 10.00 332460 BHD 2011 11 10 04 26 00 2014-99 N ch4c13 SIL -47.044 0.062 ... i1 2012 12 31 22 55 00 -41.4083 174.8710 90.00 80.00 10.00 332461 BHD 2011 12 16 05 56 00 4383-99 N ch4c13 SIL -47.067 0.143 ... i1 2012 11 13 19 36 00 -41.4083 174.8710 90.00 80.00 10.00 332462 BHD 2011 12 16 05 56 00 4384-99 N ch4c13 SIL -47.061 0.143 ... i1 2012 11 13 19 51 00 -41.4083 174.8710 90.00 80.00 10.00 332463 BHD 2012 01 05 01 40 00 1959-99 N ch4c13 SIL -47.127 0.076 ... i1 2013 04 04 20 32 00 -41.4083 174.8710 90.00 80.00 10.00 332466 BHD 2012 01 05 01 40 00 1960-99 N ch4c13 SIL -47.182 0.076 ... i1 2013 04 04 20 48 00 -41.4083 174.8710 90.00 80.00 10.00 332467 BHD 2012 01 16 00 31 00 3273-99 N ch4c13 SIL -46.730 0.102 .X. i1 2013 04 13 00 06 00 -41.4083 174.8710 90.00 80.00 10.00 332464 BHD 2012 01 16 00 31 00 3274-99 N ch4c13 SIL -46.764 0.102 ... i1 2013 04 13 00 22 00 -41.4083 174.8710 90.00 80.00 10.00 332465 BHD 2012 02 25 05 52 00 1183-99 N ch4c13 SIL -47.127 0.060 ... i1 2012 12 21 09 44 00 -41.4083 174.8710 90.00 80.00 10.00 337940 BHD 2012 02 25 05 52 00 1184-99 N ch4c13 SIL -47.047 0.060 ... i1 2012 12 21 09 59 00 -41.4083 174.8710 90.00 80.00 10.00 337941 BHD 2012 03 04 04 09 00 1205-99 N ch4c13 SIL -47.102 0.039 +.. i1 2013 01 10 20 04 00 -41.4083 174.8710 90.00 80.00 10.00 337944 BHD 2012 03 04 04 09 00 1206-99 N ch4c13 SIL -47.264 0.039 -.. i1 2013 01 10 20 19 00 -41.4083 174.8710 90.00 80.00 10.00 337945 BHD 2012 04 04 01 28 00 5275-99 N ch4c13 SIL -47.049 0.063 ... i1 2012 12 28 14 50 00 -41.4083 174.8710 90.00 80.00 10.00 337958 BHD 2012 04 04 01 28 00 5276-99 N ch4c13 SIL -47.039 0.063 ... i1 2012 12 28 15 05 00 -41.4083 174.8710 90.00 80.00 10.00 337959 BHD 2012 05 28 21 16 00 2225-99 N ch4c13 SIL -47.209 0.060 ... i1 2012 12 21 10 15 00 -41.4083 174.8710 90.00 80.00 10.00 337946 BHD 2012 05 28 21 16 00 2226-99 N ch4c13 SIL -47.224 0.060 ... i1 2012 12 21 10 30 00 -41.4083 174.8710 90.00 80.00 10.00 337947 BHD 2012 05 30 22 16 00 103-99 N ch4c13 SIL -47.153 0.062 ... i1 2012 12 20 13 53 00 -41.4083 174.8710 90.00 80.00 10.00 344579 BHD 2012 05 30 22 16 00 104-99 N ch4c13 SIL -47.138 0.062 ... i1 2012 12 20 14 08 00 -41.4083 174.8710 90.00 80.00 10.00 344580 BHD 2012 06 07 00 12 00 5391-99 N ch4c13 SIL -47.187 0.062 ... i1 2012 12 20 14 23 00 -41.4083 174.8710 90.00 80.00 10.00 344581 BHD 2012 06 07 00 12 00 5392-99 N ch4c13 SIL -47.295 0.062 ... i1 2012 12 20 14 38 00 -41.4083 174.8710 90.00 80.00 10.00 344582 BHD 2012 06 13 20 57 00 4537-99 N ch4c13 SIL -47.046 0.041 ... i1 2012 12 17 05 39 00 -41.4083 174.8710 90.00 80.00 10.00 344553 BHD 2012 06 13 20 57 00 4538-99 N ch4c13 SIL -47.106 0.041 ... i1 2012 12 17 05 55 00 -41.4083 174.8710 90.00 80.00 10.00 344554 BHD 2012 07 17 19 23 00 4851-99 N ch4c13 SIL -47.130 0.041 ... i1 2012 12 17 06 10 00 -41.4083 174.8710 90.00 80.00 10.00 344555 BHD 2012 07 17 19 23 00 4852-99 N ch4c13 SIL -47.108 0.041 ... i1 2012 12 17 06 25 00 -41.4083 174.8710 90.00 80.00 10.00 344556 BHD 2012 08 22 02 30 00 3293-99 N ch4c13 SIL -47.478 0.117 P.. i1 2013 04 19 04 10 00 -41.4083 174.8710 90.00 80.00 10.00 344573 BHD 2012 08 22 02 30 00 3294-99 N ch4c13 SIL -47.490 0.117 P.. i1 2013 04 19 04 26 00 -41.4083 174.8710 90.00 80.00 10.00 344574 BHD 2012 09 12 00 59 00 3795-99 N ch4c13 SIL -47.208 0.062 ... i1 2012 12 20 13 23 00 -41.4083 174.8710 90.00 80.00 10.00 344583 BHD 2012 09 12 00 59 00 3796-99 N ch4c13 SIL -47.166 0.062 ... i1 2012 12 20 13 38 00 -41.4083 174.8710 90.00 80.00 10.00 344584 BHD 2012 09 27 03 50 00 4445-99 N ch4c13 SIL -47.162 0.041 ... i1 2012 12 17 06 40 00 -41.4083 174.8710 90.00 80.00 10.00 344557 BHD 2012 09 27 03 50 00 4446-99 N ch4c13 SIL -47.081 0.041 ... i1 2012 12 17 06 55 00 -41.4083 174.8710 90.00 80.00 10.00 344558 BHD 2012 10 29 01 01 00 4773-99 N ch4c13 SIL -47.568 0.117 P.. i1 2013 04 19 04 42 00 -41.4083 174.8710 90.00 80.00 10.00 344559 BHD 2012 10 29 01 01 00 4774-99 N ch4c13 SIL -47.450 0.117 P.. i1 2013 04 19 04 59 00 -41.4083 174.8710 90.00 80.00 10.00 344560 BHD 2012 11 29 04 40 00 6397-66 N ch4c13 SIL -47.334 0.184 -.T i1 2013 08 22 19 27 00 -41.4083 174.8710 90.00 80.00 10.00 351045 BHD 2012 11 29 04 40 00 6398-66 N ch4c13 SIL -47.034 0.184 P.T i1 2013 08 22 19 45 00 -41.4083 174.8710 90.00 80.00 10.00 351046 BHD 2013 01 15 05 13 00 4819-99 N ch4c13 SIL -47.060 0.183 ... i1 2013 08 26 22 31 00 -41.4083 174.8710 90.00 80.00 10.00 351043 BHD 2013 01 15 05 13 00 4820-99 N ch4c13 SIL -46.949 0.183 ... i1 2013 08 26 22 49 00 -41.4083 174.8710 90.00 80.00 10.00 351044 BHD 2013 02 05 01 13 00 2169-99 N ch4c13 SIL -45.587 0.181 -.. i1 2013 08 23 17 55 00 -41.4083 174.8710 90.00 80.00 10.00 351041 BHD 2013 02 05 01 13 00 2170-99 N ch4c13 SIL -45.354 0.181 +.. i1 2013 08 23 18 13 00 -41.4083 174.8710 90.00 80.00 10.00 351042 BHD 2013 03 26 01 46 00 6193-66 N ch4c13 SIL -47.072 0.125 -.. i1 2013 09 20 20 57 00 -41.4083 174.8710 90.00 80.00 10.00 354917 BHD 2013 03 26 01 46 00 6194-66 N ch4c13 SIL -46.553 0.125 +.. i1 2013 09 23 10 35 00 -41.4083 174.8710 90.00 80.00 10.00 354918 BHD 2013 04 18 00 09 00 533-99 N ch4c13 SIL -46.272 0.125 +.. i1 2013 09 23 10 16 00 -41.4083 174.8710 90.00 80.00 10.00 354919 BHD 2013 04 18 00 09 00 534-99 N ch4c13 SIL -47.088 0.125 -.. i1 2013 09 20 20 22 00 -41.4083 174.8710 90.00 80.00 10.00 354920 BHD 2013 05 23 01 47 00 971-99 N ch4c13 SIL -47.229 0.072 ... i1 2013 10 26 00 44 00 -41.4083 174.8710 90.00 80.00 10.00 354915 BHD 2013 05 23 01 47 00 972-99 N ch4c13 SIL -47.206 0.072 ... i1 2013 10 26 01 02 00 -41.4083 174.8710 90.00 80.00 10.00 354916 BHD 2013 06 14 00 12 00 2429-99 N ch4c13 SIL -47.141 0.081 ... i1 2013 10 17 23 14 00 -41.4083 174.8710 90.00 80.00 10.00 354913 BHD 2013 06 14 00 12 00 2430-99 N ch4c13 SIL -47.088 0.081 ... i1 2013 10 17 23 31 00 -41.4083 174.8710 90.00 80.00 10.00 354914 BHD 2013 06 28 03 27 00 1000-99 N ch4c13 SIL -47.229 0.090 -.. i1 2014 08 11 15 34 00 -41.4083 174.8710 90.00 80.00 10.00 366210 BHD 2013 06 28 03 27 00 2137-99 N ch4c13 SIL -47.067 0.090 +.. i1 2014 08 11 15 16 00 -41.4083 174.8710 90.00 80.00 10.00 366211 BHD 2013 08 11 18 26 00 1158-99 N ch4c13 SIL -47.226 0.102 ..S i1 2014 07 22 21 35 00 -41.4083 174.8710 90.00 80.00 10.00 366225 BHD 2013 08 28 21 12 00 5155-99 N ch4c13 SIL -47.123 0.101 ... i1 2014 07 23 16 08 00 -41.4083 174.8710 90.00 80.00 10.00 366222 BHD 2013 08 28 21 12 00 5156-99 N ch4c13 SIL -47.154 0.101 ... i1 2014 07 23 16 26 00 -41.4083 174.8710 90.00 80.00 10.00 366223 BHD 2013 09 17 01 08 00 2523-99 N ch4c13 SIL -47.219 0.101 ... i1 2014 07 23 21 34 00 -41.4083 174.8710 90.00 80.00 10.00 366246 BHD 2013 09 17 01 08 00 2524-99 N ch4c13 SIL -47.246 0.101 ... i1 2014 07 23 21 52 00 -41.4083 174.8710 90.00 80.00 10.00 366247 BHD 2013 11 26 22 14 00 3133-99 N ch4c13 SIL -47.170 0.066 ... i1 2014 08 08 05 34 00 -41.4083 174.8710 90.00 80.00 10.00 366206 BHD 2013 11 26 22 14 00 3134-99 N ch4c13 SIL -47.038 0.066 ... i1 2014 08 08 05 52 00 -41.4083 174.8710 90.00 80.00 10.00 366207 BHD 2014 01 27 01 05 00 1543-99 N ch4c13 SIL -46.966 0.090 ... i1 2014 08 11 14 40 00 -41.4083 174.8710 90.00 80.00 10.00 366212 BHD 2014 01 27 01 05 00 1544-99 N ch4c13 SIL -47.031 0.090 ... i1 2014 08 11 14 58 00 -41.4083 174.8710 90.00 80.00 10.00 366213 BHD 2014 02 25 02 07 00 5067-99 N ch4c13 SIL -46.963 0.102 +.. i1 2014 07 22 22 29 00 -41.4083 174.8710 90.00 80.00 10.00 366208 BHD 2014 02 25 02 07 00 5068-99 N ch4c13 SIL -47.192 0.102 -.. i1 2014 07 22 22 47 00 -41.4083 174.8710 90.00 80.00 10.00 366209 BHD 2014 03 05 00 02 00 1373-99 N ch4c13 SIL -47.377 34.053 L.T i1 2014 08 26 17 50 00 -41.4083 174.8710 90.00 80.00 10.00 367990 BHD 2014 03 05 00 02 00 1374-99 N ch4c13 SIL -47.212 34.053 L.T i1 2014 08 26 18 08 00 -41.4083 174.8710 90.00 80.00 10.00 367991 BHD 2014 03 26 23 51 00 4017-99 N ch4c13 SIL -47.114 0.069 ... i1 2014 08 25 14 54 00 -41.4083 174.8710 90.00 80.00 10.00 367994 BHD 2014 03 26 23 51 00 4018-99 N ch4c13 SIL -47.138 0.069 ... i1 2014 08 25 15 12 00 -41.4083 174.8710 90.00 80.00 10.00 367995 BHD 2014 04 08 00 47 00 2609-99 N ch4c13 SIL -47.331 0.069 ... i1 2014 08 25 20 19 00 -41.4083 174.8710 90.00 80.00 10.00 367988 BHD 2014 04 08 00 47 00 2610-99 N ch4c13 SIL -47.217 0.069 ... i1 2014 08 25 20 37 00 -41.4083 174.8710 90.00 80.00 10.00 367989 BHD 2014 04 29 00 46 00 3279-99 N ch4c13 SIL -47.383 0.069 ... i1 2014 08 25 19 43 00 -41.4083 174.8710 90.00 80.00 10.00 367992 BHD 2014 04 29 00 46 00 3280-99 N ch4c13 SIL -47.370 0.069 ... i1 2014 08 25 20 01 00 -41.4083 174.8710 90.00 80.00 10.00 367993 BHD 2014 05 26 04 58 00 2121-99 N ch4c13 SIL -47.019 0.070 ... i1 2014 10 21 21 54 00 -41.4083 174.8710 90.00 80.00 10.00 374372 BHD 2014 05 26 04 58 00 2122-99 N ch4c13 SIL -47.035 0.070 ... i1 2014 10 21 22 12 00 -41.4083 174.8710 90.00 80.00 10.00 374373 BHD 2014 06 21 12 58 00 895-99 N ch4c13 SIL -47.126 0.070 ... i1 2014 10 21 21 18 00 -41.4083 174.8710 90.00 80.00 10.00 374395 BHD 2014 06 21 12 58 00 896-99 N ch4c13 SIL -47.151 0.070 ... i1 2014 10 21 21 36 00 -41.4083 174.8710 90.00 80.00 10.00 374396 BHD 2014 07 17 22 11 00 2437-99 N ch4c13 SIL -47.298 0.066 ... i1 2014 12 22 23 16 00 -41.4083 174.8710 90.00 80.00 10.00 374524 BHD 2014 07 17 22 11 00 2438-99 N ch4c13 SIL -47.226 0.066 ... i1 2014 12 22 23 35 00 -41.4083 174.8710 90.00 80.00 10.00 374525 BHD 2014 08 12 15 02 00 4245-99 N ch4c13 SIL -47.366 0.073 ... i1 2015 03 05 00 02 00 -41.4083 174.8710 90.00 80.00 10.00 381446 BHD 2014 08 12 15 02 00 4246-99 N ch4c13 SIL -47.353 0.073 ... i1 2015 03 05 00 21 00 -41.4083 174.8710 90.00 80.00 10.00 381447 BHD 2014 08 25 01 48 00 2469-99 N ch4c13 SIL -47.224 0.066 ... i1 2014 12 22 22 38 00 -41.4083 174.8710 90.00 80.00 10.00 374526 BHD 2014 08 25 01 48 00 2470-99 N ch4c13 SIL -47.170 0.066 ... i1 2014 12 22 22 57 00 -41.4083 174.8710 90.00 80.00 10.00 374527 BHD 2014 09 22 01 10 00 5239-99 N ch4c13 SIL -47.070 0.074 ... i1 2015 03 05 22 48 00 -41.4083 174.8710 90.00 80.00 10.00 381444 BHD 2014 09 22 01 10 00 5240-99 N ch4c13 SIL -47.210 0.074 ... i1 2015 03 05 23 07 00 -41.4083 174.8710 90.00 80.00 10.00 381445 BHD 2014 11 04 23 01 00 2041-99 N ch4c13 SIL -47.125 0.074 +.. i1 2015 03 05 21 32 00 -41.4083 174.8710 90.00 80.00 10.00 381440 BHD 2014 11 04 23 01 00 2042-99 N ch4c13 SIL -47.279 0.074 -.. i1 2015 03 05 21 51 00 -41.4083 174.8710 90.00 80.00 10.00 381441 BHD 2014 12 10 00 07 00 4239-99 N ch4c13 SIL -47.157 0.074 ... i1 2015 03 05 22 10 00 -41.4083 174.8710 90.00 80.00 10.00 381442 BHD 2014 12 10 00 07 00 4240-99 N ch4c13 SIL -47.233 0.074 ... i1 2015 03 05 22 29 00 -41.4083 174.8710 90.00 80.00 10.00 381443 BHD 2015 02 25 23 44 00 4857-99 N ch4c13 SIL -47.071 0.041 A.. i1 2016 03 15 19 32 00 -41.4083 174.8710 95.00 85.00 10.00 399482 BHD 2015 02 25 23 44 00 4858-99 N ch4c13 SIL -47.032 0.041 A.. i1 2016 03 15 19 51 00 -41.4083 174.8710 95.00 85.00 10.00 399483 BHD 2015 03 18 02 04 00 4625-99 N ch4c13 SIL -47.165 0.038 ... i1 2016 04 12 11 14 00 -41.4083 174.8710 95.00 85.00 10.00 399484 BHD 2015 03 18 02 04 00 4626-99 N ch4c13 SIL -47.164 0.038 ... i1 2016 04 12 11 33 00 -41.4083 174.8710 95.00 85.00 10.00 399485 BHD 2015 04 28 00 21 00 595-99 N ch4c13 SIL -47.215 0.041 A.. i1 2016 03 15 18 52 00 -41.4083 174.8710 95.00 85.00 10.00 399478 BHD 2015 04 28 00 21 00 596-99 N ch4c13 SIL -47.062 0.041 A.. i1 2016 03 15 19 12 00 -41.4083 174.8710 95.00 85.00 10.00 399479 BHD 2015 06 23 01 10 00 2507-99 N ch4c13 SIL -47.144 0.041 A.. i1 2016 03 15 18 13 00 -41.4083 174.8710 95.00 85.00 10.00 399480 BHD 2015 06 23 01 10 00 2508-99 N ch4c13 SIL -47.152 0.041 A.. i1 2016 03 15 18 33 00 -41.4083 174.8710 95.00 85.00 10.00 399481 BHD 2015 07 10 00 17 00 5379-99 N ch4c13 SIL -47.290 0.038 ... i1 2016 04 14 12 48 00 -41.4083 174.8710 95.00 85.00 10.00 399486 BHD 2015 07 10 00 17 00 5380-99 N ch4c13 SIL -47.309 0.038 ... i1 2016 04 14 13 06 00 -41.4083 174.8710 95.00 85.00 10.00 399487 BHD 2015 07 22 02 32 00 4889-99 N ch4c13 SIL -47.110 0.038 ... i1 2016 04 12 11 51 00 -41.4083 174.8710 95.00 85.00 10.00 399488 BHD 2015 07 22 02 32 00 4890-99 N ch4c13 SIL -47.091 0.038 ... i1 2016 04 12 12 09 00 -41.4083 174.8710 95.00 85.00 10.00 399489 BHD 2015 09 03 01 30 00 1331-99 N ch4c13 SIL -47.248 0.042 ... i1 2016 04 29 23 20 00 -41.4083 174.8710 95.00 85.00 10.00 399447 BHD 2015 09 03 01 30 00 1332-99 N ch4c13 SIL -47.166 0.042 ... i1 2016 04 29 23 38 00 -41.4083 174.8710 95.00 85.00 10.00 399448 BHD 2015 10 08 00 14 00 115-99 N ch4c13 SIL -47.133 0.039 ... i1 2016 04 14 00 52 00 -41.4083 174.8710 95.00 85.00 10.00 399433 BHD 2015 10 08 00 14 00 116-99 N ch4c13 SIL -47.141 0.039 ... i1 2016 04 14 01 11 00 -41.4083 174.8710 95.00 85.00 10.00 399434 BHD 2015 10 21 23 53 00 5401-99 N ch4c13 SIL -47.143 0.038 ... i1 2016 04 18 14 09 00 -41.4083 174.8710 95.00 85.00 10.00 399445 BHD 2015 10 21 23 53 00 5402-99 N ch4c13 SIL -47.155 0.038 ... i1 2016 04 18 14 27 00 -41.4083 174.8710 95.00 85.00 10.00 399446 BHD 2015 11 12 01 54 00 143-99 N ch4c13 SIL -47.333 0.038 -.. i1 2016 04 12 16 35 00 -41.4083 174.8710 95.00 85.00 10.00 399443 BHD 2015 11 12 01 54 00 144-99 N ch4c13 SIL -47.143 0.038 +.. i1 2016 04 12 16 53 00 -41.4083 174.8710 95.00 85.00 10.00 399444 BHD 2015 12 17 00 15 00 5051-99 N ch4c13 SIL -47.141 -0.009 ..o i1 2016 07 21 15 47 00 -41.4083 174.8710 95.00 85.00 10.00 405819 BHD 2015 12 17 00 15 00 5052-99 N ch4c13 SIL -47.178 -0.009 ..o i1 2016 07 21 16 08 00 -41.4083 174.8710 95.00 85.00 10.00 405820 BHD 2016 01 28 01 28 00 1775-99 N ch4c13 SIL -47.127 0.033 ... i1 2016 07 22 19 24 00 -41.4083 174.8710 95.00 85.00 10.00 405821 BHD 2016 01 28 01 28 00 1776-99 N ch4c13 SIL -47.150 0.033 ... i1 2016 07 22 19 45 00 -41.4083 174.8710 95.00 85.00 10.00 405822 BHD 2016 02 29 23 55 00 2366-99 N ch4c13 SIL -47.090 0.047 ... i1 2016 06 24 08 35 00 -41.4083 174.8710 95.00 85.00 10.00 405818 BHD 2016 02 29 23 55 00 4203-99 N ch4c13 SIL -47.149 0.047 ... i1 2016 06 24 08 14 00 -41.4083 174.8710 95.00 85.00 10.00 405817 BHD 2016 03 16 01 05 00 5399-99 N ch4c13 SIL -47.018 -0.009 ..o i1 2016 12 13 15 11 00 -41.4083 174.8710 95.00 85.00 10.00 415194 BHD 2016 03 16 01 05 00 5400-99 N ch4c13 SIL -47.061 -0.009 ..o i1 2016 12 13 15 32 00 -41.4083 174.8710 95.00 85.00 10.00 415195 BHD 2016 05 16 23 38 00 4175-99 N ch4c13 SIL -47.185 -0.009 ..o i1 2016 12 13 15 54 00 -41.4083 174.8710 95.00 85.00 10.00 415190 BHD 2016 05 16 23 38 00 4176-99 N ch4c13 SIL -47.161 -0.009 ..o i1 2016 12 13 16 15 00 -41.4083 174.8710 95.00 85.00 10.00 415191 BHD 2016 05 31 01 38 00 2541-99 N ch4c13 SIL -47.100 -0.009 ..o i1 2016 10 25 22 40 00 -41.4083 174.8710 95.00 85.00 10.00 415188 BHD 2016 05 31 01 38 00 2542-99 N ch4c13 SIL -47.163 -0.009 ..o i1 2016 10 25 23 01 00 -41.4083 174.8710 95.00 85.00 10.00 415189 BHD 2016 06 30 02 00 00 5379-99 N ch4c13 SIL -47.127 -0.009 ..o i1 2016 10 25 21 58 00 -41.4083 174.8710 95.00 85.00 10.00 415192 BHD 2016 06 30 02 00 00 5380-99 N ch4c13 SIL -47.175 -0.009 ..o i1 2016 10 25 22 19 00 -41.4083 174.8710 95.00 85.00 10.00 415193 BHD 2016 08 04 02 30 00 4701-99 N ch4c13 SIL -47.170 0.052 ... i1 2016 10 26 22 30 00 -41.4083 174.8710 95.00 85.00 10.00 415196 BHD 2016 08 04 02 30 00 4702-99 N ch4c13 SIL -47.184 0.052 ... i1 2016 10 26 22 51 00 -41.4083 174.8710 95.00 85.00 10.00 415197 BHD 2016 09 08 02 20 00 1859-99 N ch4c13 SIL -47.264 0.057 ... i1 2017 05 09 07 02 00 -41.4083 174.8710 95.00 85.00 10.00 422203 BHD 2016 09 08 02 20 00 1859-99 N ch4c13 SIL -47.112 0.061 -.. i1 2017 05 13 12 29 00 -41.4083 174.8710 95.00 85.00 10.00 422203 BHD 2016 09 08 02 20 00 1860-99 N ch4c13 SIL -47.220 0.057 ... i1 2017 05 09 07 22 00 -41.4083 174.8710 95.00 85.00 10.00 422204 BHD 2016 09 08 02 20 00 1860-99 N ch4c13 SIL -46.337 0.061 +.. i1 2017 05 13 12 52 00 -41.4083 174.8710 95.00 85.00 10.00 422204 BHD 2016 09 22 03 40 00 175-99 N ch4c13 SIL -47.152 0.047 ... i1 2016 11 01 22 24 00 -41.4083 174.8710 95.00 85.00 10.00 415186 BHD 2016 09 22 03 40 00 176-99 N ch4c13 SIL -47.185 0.047 ... i1 2016 11 01 22 45 00 -41.4083 174.8710 95.00 85.00 10.00 415187 BHD 2017 01 20 00 34 00 1252-99 N ch4c13 SIL -47.114 -0.009 ..o i1 2017 04 28 23 13 00 -41.4083 174.8710 95.00 85.00 10.00 422202 BHD 2017 01 20 00 34 00 327-99 N ch4c13 SIL -47.122 -0.009 ..o i1 2017 04 28 22 54 00 -41.4083 174.8710 95.00 85.00 10.00 422201 BHD 2017 02 09 03 17 00 1991-99 N ch4c13 SIL -47.089 0.057 ... i1 2017 05 09 07 43 00 -41.4083 174.8710 95.00 85.00 10.00 422205 BHD 2017 02 09 03 17 00 1991-99 N ch4c13 SIL -47.274 0.061 ... i1 2017 05 13 13 15 00 -41.4083 174.8710 95.00 85.00 10.00 422205 BHD 2017 02 09 03 17 00 1992-99 N ch4c13 SIL -47.107 0.057 ... i1 2017 05 09 08 03 00 -41.4083 174.8710 95.00 85.00 10.00 422206 BHD 2017 02 09 03 17 00 1992-99 N ch4c13 SIL -47.228 0.061 ... i1 2017 05 13 13 37 00 -41.4083 174.8710 95.00 85.00 10.00 422206 BHD 2017 02 23 02 40 00 2565-99 N ch4c13 SIL -47.178 0.037 ... i1 2017 09 19 18 17 00 -41.4083 174.8710 95.00 85.00 10.00 429488 BHD 2017 02 23 02 40 00 933-99 N ch4c13 SIL -47.098 0.037 ... i1 2017 09 19 17 54 00 -41.4083 174.8710 95.00 85.00 10.00 429487 BHD 2017 03 07 02 35 00 2585-99 N ch4c13 SIL -47.126 0.036 ... i1 2017 09 21 17 35 00 -41.4083 174.8710 95.00 85.00 10.00 429485 BHD 2017 03 07 02 35 00 99-99 N ch4c13 SIL -47.135 0.036 ... i1 2017 09 21 17 57 00 -41.4083 174.8710 95.00 85.00 10.00 429486 BHD 2017 03 23 02 19 00 533-99 N ch4c13 SIL -47.227 0.036 ... i1 2017 09 14 19 59 00 -41.4083 174.8710 95.00 85.00 10.00 430028 BHD 2017 03 23 02 19 00 534-99 N ch4c13 SIL -47.156 0.036 ... i1 2017 09 14 20 21 00 -41.4083 174.8710 95.00 85.00 10.00 430029 BHD 2017 04 07 02 01 00 3819-99 N ch4c13 SIL -47.161 0.036 ... i1 2017 09 14 21 07 00 -41.4083 174.8710 95.00 85.00 10.00 430027 BHD 2017 04 07 02 01 00 3820-99 N ch4c13 SIL -47.251 0.036 ... i1 2017 09 14 20 44 00 -41.4083 174.8710 95.00 85.00 10.00 430026 BHD 2017 05 19 20 02 00 129-99 N ch4c13 SIL -47.179 0.037 ... i1 2017 09 18 17 16 00 -41.4083 174.8710 95.00 85.00 10.00 429483 BHD 2017 05 19 20 02 00 130-99 N ch4c13 SIL -47.159 0.037 ... i1 2017 09 18 17 39 00 -41.4083 174.8710 95.00 85.00 10.00 429484 BHD 2017 05 19 20 02 00 130-99 N ch4c13 SIL -47.449 0.037 ... i1 2017 09 18 18 02 00 -41.4083 174.8710 95.00 85.00 10.00 429484 BHD 2017 06 13 23 00 00 3032-99 N ch4c13 SIL -47.228 0.036 ... i1 2017 09 13 19 58 00 -41.4083 174.8710 95.00 85.00 10.00 429482 BHD 2017 06 13 23 00 00 5685-99 N ch4c13 SIL -47.238 0.036 ... i1 2017 09 13 19 35 00 -41.4083 174.8710 95.00 85.00 10.00 429481 BHD 2017 07 27 23 46 00 675-99 N ch4c13 SIL -47.257 0.037 ... i1 2017 09 18 15 46 00 -41.4083 174.8710 95.00 85.00 10.00 429479 BHD 2017 07 27 23 46 00 676-99 N ch4c13 SIL -47.232 0.037 ... i1 2017 09 18 16 08 00 -41.4083 174.8710 95.00 85.00 10.00 429480 BHD 2017 08 03 01 24 00 1507-99 N ch4c13 SIL -47.277 0.037 ... i1 2017 09 19 20 10 00 -41.4083 174.8710 95.00 85.00 10.00 429477 BHD 2017 08 03 01 24 00 1508-99 N ch4c13 SIL -47.211 0.037 ... i1 2017 09 19 20 33 00 -41.4083 174.8710 95.00 85.00 10.00 429478 BHD 2017 08 17 00 29 00 2239-99 N ch4c13 SIL -47.253 0.063 ... i1 2018 04 04 12 42 00 -41.4083 174.8710 95.00 85.00 10.00 439565 BHD 2017 08 17 00 29 00 3031-99 N ch4c13 SIL -47.302 0.063 ... i1 2018 04 04 13 04 00 -41.4083 174.8710 95.00 85.00 10.00 439566 BHD 2017 09 05 22 48 00 2935-99 N ch4c13 SIL -47.308 0.081 ... i1 2018 03 08 06 39 00 -41.4083 174.8710 95.00 85.00 10.00 439231 BHD 2017 09 05 22 48 00 4042-99 N ch4c13 SIL -47.408 0.081 ... i1 2018 03 08 06 18 00 -41.4083 174.8710 95.00 85.00 10.00 439230 BHD 2017 09 28 00 42 00 2240-99 N ch4c13 SIL -47.148 0.081 ... i1 2018 03 07 20 11 00 -41.4083 174.8710 95.00 85.00 10.00 439232 BHD 2017 09 28 00 42 00 4041-99 N ch4c13 SIL -47.191 0.081 ... i1 2018 03 07 19 50 00 -41.4083 174.8710 95.00 85.00 10.00 439233 BHD 2017 10 05 02 42 00 1205-99 N ch4c13 SIL -47.200 0.101 ... i1 2018 03 07 09 54 00 -41.4083 174.8710 95.00 85.00 10.00 439212 BHD 2017 10 05 02 42 00 1232-99 N ch4c13 SIL -47.134 0.101 ... i1 2018 03 07 10 15 00 -41.4083 174.8710 95.00 85.00 10.00 439213 BHD 2017 10 17 23 11 00 1766-99 N ch4c13 SIL -47.277 0.101 ... i1 2018 03 07 09 32 00 -41.4083 174.8710 95.00 85.00 10.00 439211 BHD 2017 10 17 23 11 00 3353-99 N ch4c13 SIL -47.289 0.101 ... i1 2018 03 07 09 10 00 -41.4083 174.8710 95.00 85.00 10.00 439210 BHD 2017 11 13 00 30 00 4017-99 N ch4c13 SIL -47.254 0.080 ... i1 2018 03 09 04 08 00 -41.4083 174.8710 95.00 85.00 10.00 439208 BHD 2017 11 13 00 30 00 4018-99 N ch4c13 SIL -47.239 0.080 ... i1 2018 03 09 04 30 00 -41.4083 174.8710 95.00 85.00 10.00 439209