SPO 1997 10 01 00 00 47 2.7 -9 680.20 -59.9 -57.2 -59.4 -99 0 SPO 1997 10 01 00 01 46 2.4 -9 680.20 -60.2 -57.2 -59.7 -99 -99 SPO 1997 10 01 00 02 50 2.5 -9 680.20 -60.4 -57.2 -59.8 -99 -99 SPO 1997 10 01 00 03 51 2.6 -9 680.30 -60.4 -57.2 -59.8 73 -99 SPO 1997 10 01 00 04 51 2.7 -9 680.30 -60.4 -57.2 -59.7 72 -99 SPO 1997 10 01 00 05 50 2.9 -9 680.30 -60.2 -57.2 -59.6 70 -99 SPO 1997 10 01 00 06 50 2.9 -9 680.30 -60.2 -57.2 -59.6 70 -99 SPO 1997 10 01 00 07 49 2.9 -9 680.30 -60.3 -57.2 -59.7 71 -99 SPO 1997 10 01 00 08 49 2.5 -9 680.30 -60.8 -57.4 -60.2 74 -99 SPO 1997 10 01 00 09 47 2.4 -9 680.30 -61.2 -57.4 -60.7 75 -99 SPO 1997 10 01 00 10 48 2.3 -9 680.30 -61.6 -57.4 -60.8 75 -99 SPO 1997 10 01 00 11 43 2.8 -9 680.30 -61.7 -57.3 -60.9 74 -99 SPO 1997 10 01 00 12 43 2.8 -9 680.20 -61.8 -57.2 -60.9 72 -99 SPO 1997 10 01 00 13 39 3.3 -9 680.20 -61.7 -57.2 -61.0 71 -99 SPO 1997 10 01 00 14 40 3.3 -9 680.20 -61.6 -57.1 -60.9 69 -99 SPO 1997 10 01 00 15 42 3.3 -9 680.20 -61.5 -57.1 -60.8 69 -99 SPO 1997 10 01 00 16 42 3.1 -9 680.20 -61.5 -57.0 -60.9 69 -99 SPO 1997 10 01 00 17 46 2.9 -9 680.30 -61.6 -57.1 -60.9 69 -99 SPO 1997 10 01 00 18 47 2.5 -9 680.30 -61.6 -57.1 -61.0 69 -99 SPO 1997 10 01 00 19 43 2.5 -9 680.30 -61.6 -57.2 -61.0 69 -99 SPO 1997 10 01 00 20 57 2.1 -9 680.30 -61.4 -57.3 -60.9 67 -99 SPO 1997 10 01 00 21 66 2.0 -9 680.30 -61.5 -57.6 -61.1 67 -99 SPO 1997 10 01 00 22 70 2.1 -9 680.30 -61.6 -57.8 -61.2 67 -99 SPO 1997 10 01 00 23 66 2.3 -9 680.30 -61.7 -57.8 -61.2 67 -99 SPO 1997 10 01 00 24 58 2.5 -9 680.30 -61.6 -57.7 -61.2 67 -99 SPO 1997 10 01 00 25 52 2.6 -9 680.30 -61.6 -57.6 -61.2 69 -99 SPO 1997 10 01 00 26 50 2.7 -9 680.30 -61.6 -57.5 -61.2 69 -99 SPO 1997 10 01 00 27 45 2.7 -9 680.30 -61.5 -57.5 -61.2 68 -99 SPO 1997 10 01 00 28 43 2.9 -9 680.30 -61.4 -57.5 -61.2 67 -99 SPO 1997 10 01 00 29 42 3.0 -9 680.30 -61.4 -57.5 -61.2 68 -99 SPO 1997 10 01 00 30 45 2.8 -9 680.30 -61.4 -57.5 -61.2 67 -99 SPO 1997 10 01 00 31 50 2.5 -9 680.30 -61.4 -57.6 -61.2 67 -99 SPO 1997 10 01 00 32 50 2.5 -9 680.30 -61.4 -57.6 -61.1 67 -99 SPO 1997 10 01 00 33 46 2.7 -9 680.40 -61.4 -57.5 -61.1 67 -99 SPO 1997 10 01 00 34 45 2.9 -9 680.40 -61.4 -57.5 -61.1 67 -99 SPO 1997 10 01 00 35 43 2.9 -9 680.30 -61.4 -57.5 -61.1 67 -99 SPO 1997 10 01 00 36 43 3.1 -9 680.40 -61.4 -57.5 -61.1 67 -99 SPO 1997 10 01 00 37 43 3.1 -9 680.40 -61.3 -57.5 -61.1 67 -99 SPO 1997 10 01 00 38 44 3.0 -9 680.40 -61.3 -57.5 -61.1 67 -99 SPO 1997 10 01 00 39 46 3.1 -9 680.40 -61.2 -57.5 -61.0 67 -99 SPO 1997 10 01 00 40 45 3.0 -9 680.40 -61.2 -57.4 -61.0 67 -99 SPO 1997 10 01 00 41 46 2.9 -9 680.40 -61.2 -57.3 -61.0 67 -99 SPO 1997 10 01 00 42 46 2.9 -9 680.40 -61.1 -57.3 -60.9 67 -99 SPO 1997 10 01 00 43 49 2.8 -9 680.40 -61.0 -57.5 -60.9 66 -99 SPO 1997 10 01 00 44 50 2.9 -9 680.40 -61.0 -57.6 -60.9 65 -99 SPO 1997 10 01 00 45 51 2.7 -9 680.40 -61.0 -57.7 -60.9 65 -99 SPO 1997 10 01 00 46 53 2.6 -9 680.40 -61.0 -57.8 -60.9 65 -99 SPO 1997 10 01 00 47 54 2.3 -9 680.40 -61.0 -57.8 -60.8 68 -99 SPO 1997 10 01 00 48 58 2.1 -9 680.50 -61.0 -57.9 -60.8 68 -99 SPO 1997 10 01 00 49 61 2.2 -9 680.50 -61.0 -58.0 -60.8 68 -99 SPO 1997 10 01 00 50 57 2.2 -9 680.50 -61.0 -57.9 -60.9 68 -99 SPO 1997 10 01 00 51 59 2.1 -9 680.50 -61.1 -58.0 -60.9 69 -99 SPO 1997 10 01 00 52 53 2.4 -9 680.50 -61.1 -58.0 -60.9 69 -99 SPO 1997 10 01 00 53 53 2.4 -9 680.50 -61.1 -58.0 -60.9 69 -99 SPO 1997 10 01 00 54 54 2.3 -9 680.50 -61.1 -58.0 -60.9 69 -99 SPO 1997 10 01 00 55 54 2.1 -9 680.50 -61.1 -58.1 -60.9 69 -99 SPO 1997 10 01 00 56 54 2.0 -9 680.60 -61.1 -58.2 -60.9 68 -99 SPO 1997 10 01 00 57 54 2.2 -9 680.60 -61.1 -58.3 -60.9 68 -99 SPO 1997 10 01 00 58 54 2.4 -9 680.60 -61.1 -58.3 -60.9 68 -99 SPO 1997 10 01 00 59 54 2.6 -9 680.60 -61.1 -58.2 -60.9 68 -99 SPO 1997 10 01 01 00 54 2.5 -9 680.60 -61.0 -58.3 -60.9 68 0 SPO 1997 10 01 01 01 54 2.3 -9 680.60 -61.1 -58.4 -60.8 69 -99 SPO 1997 10 01 01 02 54 1.9 -9 680.60 -61.1 -58.5 -60.9 72 -99 SPO 1997 10 01 01 03 54 1.7 -9 680.60 -61.1 -58.6 -60.9 72 -99 SPO 1997 10 01 01 04 54 1.8 -9 680.60 -61.2 -58.5 -60.9 73 -99 SPO 1997 10 01 01 05 54 2.0 -9 680.60 -61.2 -58.5 -60.9 73 -99 SPO 1997 10 01 01 06 54 2.1 -9 680.60 -61.2 -58.3 -60.9 71 -99 SPO 1997 10 01 01 07 54 2.1 -9 680.60 -61.2 -58.3 -60.9 70 -99 SPO 1997 10 01 01 08 54 2.1 -9 680.60 -61.2 -58.2 -60.9 70 -99 SPO 1997 10 01 01 09 54 2.2 -9 680.60 -61.2 -58.2 -61.0 70 -99 SPO 1997 10 01 01 10 54 2.3 -9 680.50 -61.2 -58.1 -61.0 70 -99 SPO 1997 10 01 01 11 54 2.5 -9 680.50 -61.2 -58.0 -61.0 70 -99 SPO 1997 10 01 01 12 50 2.8 -9 680.50 -61.2 -57.9 -61.0 70 -99 SPO 1997 10 01 01 13 35 3.2 -9 680.50 -61.2 -57.8 -61.0 70 -99 SPO 1997 10 01 01 14 37 3.1 -9 680.50 -61.2 -57.8 -61.0 70 -99 SPO 1997 10 01 01 15 38 3.1 -9 680.50 -61.2 -57.8 -61.0 71 -99 SPO 1997 10 01 01 16 40 3.2 -9 680.50 -61.1 -57.8 -60.9 70 -99 SPO 1997 10 01 01 17 40 3.1 -9 680.50 -61.1 -57.8 -60.9 70 -99 SPO 1997 10 01 01 18 40 3.3 -9 680.50 -61.1 -57.8 -60.9 69 -99 SPO 1997 10 01 01 19 39 3.4 -9 680.50 -61.1 -57.7 -60.9 69 -99 SPO 1997 10 01 01 20 38 3.6 -9 680.50 -61.0 -57.7 -60.8 68 -99 SPO 1997 10 01 01 21 37 3.6 -9 680.50 -60.8 -57.7 -60.7 67 -99 SPO 1997 10 01 01 22 36 3.6 -9 680.40 -60.7 -57.7 -60.6 66 -99 SPO 1997 10 01 01 23 36 3.8 -9 680.40 -60.6 -57.6 -60.4 68 -99 SPO 1997 10 01 01 24 37 3.6 -9 680.40 -60.3 -57.6 -60.2 67 -99 SPO 1997 10 01 01 25 38 3.6 -9 680.40 -60.1 -57.6 -60.0 66 -99 SPO 1997 10 01 01 26 37 3.7 -9 680.40 -59.8 -57.5 -59.8 65 -99 SPO 1997 10 01 01 27 37 4.1 -9 680.40 -59.6 -57.5 -59.6 65 -99 SPO 1997 10 01 01 28 37 3.9 -9 680.50 -59.4 -57.4 -59.4 66 -99 SPO 1997 10 01 01 29 38 4.1 -9 680.40 -59.2 -57.4 -59.2 66 -99 SPO 1997 10 01 01 30 38 4.1 -9 680.40 -59.0 -57.4 -59.1 65 -99 SPO 1997 10 01 01 31 36 4.1 -9 680.40 -59.0 -57.4 -59.0 67 -99 SPO 1997 10 01 01 32 36 4.2 -9 680.50 -58.8 -57.3 -59.0 65 -99 SPO 1997 10 01 01 33 36 4.2 -9 680.40 -58.8 -57.2 -58.8 67 -99 SPO 1997 10 01 01 34 35 4.3 -9 680.50 -58.6 -57.2 -58.7 66 -99 SPO 1997 10 01 01 35 36 4.1 -9 680.50 -58.5 -57.2 -58.6 67 -99 SPO 1997 10 01 01 36 36 4.2 -9 680.50 -58.5 -57.2 -58.6 69 -99 SPO 1997 10 01 01 37 35 4.3 -9 680.50 -58.4 -57.1 -58.5 69 -99 SPO 1997 10 01 01 38 34 4.5 -9 680.50 -58.3 -57.0 -58.4 70 -99 SPO 1997 10 01 01 39 33 4.4 -9 680.50 -58.2 -57.0 -58.3 69 -99 SPO 1997 10 01 01 40 32 4.4 -9 680.50 -58.2 -56.9 -58.2 69 -99 SPO 1997 10 01 01 41 32 4.5 -9 680.60 -58.1 -56.9 -58.2 70 -99 SPO 1997 10 01 01 42 32 4.7 -9 680.60 -58.0 -56.8 -58.1 69 -99 SPO 1997 10 01 01 43 32 4.7 -9 680.60 -58.0 -56.8 -58.0 69 -99 SPO 1997 10 01 01 44 32 4.8 -9 680.60 -57.9 -56.8 -57.9 68 -99 SPO 1997 10 01 01 45 32 4.8 -9 680.60 -57.8 -56.7 -57.9 68 -99 SPO 1997 10 01 01 46 32 4.7 -9 680.60 -57.8 -56.8 -57.9 70 -99 SPO 1997 10 01 01 47 32 4.7 -9 680.60 -57.8 -56.8 -57.8 70 -99 SPO 1997 10 01 01 48 30 4.6 -9 680.70 -57.7 -56.7 -57.8 71 -99 SPO 1997 10 01 01 49 30 4.6 -9 680.70 -57.7 -56.7 -57.8 71 -99 SPO 1997 10 01 01 50 29 4.6 -9 680.70 -57.7 -56.6 -57.7 71 -99 SPO 1997 10 01 01 51 29 4.6 -9 680.70 -57.6 -56.6 -57.7 71 -99 SPO 1997 10 01 01 52 28 4.8 -9 680.60 -57.6 -56.6 -57.6 71 -99 SPO 1997 10 01 01 53 27 4.9 -9 680.60 -57.6 -56.6 -57.6 70 -99 SPO 1997 10 01 01 54 26 5.0 -9 680.60 -57.5 -56.6 -57.6 69 -99 SPO 1997 10 01 01 55 25 5.0 -9 680.60 -57.5 -56.6 -57.5 69 -99 SPO 1997 10 01 01 56 24 5.0 -9 680.60 -57.5 -56.6 -57.5 69 -99 SPO 1997 10 01 01 57 24 5.1 -9 680.60 -57.4 -56.5 -57.5 68 -99 SPO 1997 10 01 01 58 24 5.2 -9 680.60 -57.4 -56.5 -57.5 68 -99 SPO 1997 10 01 01 59 25 5.5 -9 680.60 -57.4 -56.5 -57.4 69 -99 SPO 1997 10 01 02 00 25 5.5 -9 680.60 -57.4 -56.5 -57.4 71 0 SPO 1997 10 01 02 01 25 5.5 -9 680.60 -57.4 -56.4 -57.4 71 -99 SPO 1997 10 01 02 02 24 5.5 -9 680.60 -57.3 -56.3 -57.4 70 -99 SPO 1997 10 01 02 03 24 5.5 -9 680.60 -57.3 -56.3 -57.4 72 -99 SPO 1997 10 01 02 04 24 5.6 -9 680.60 -57.3 -56.3 -57.4 70 -99 SPO 1997 10 01 02 05 24 5.5 -9 680.60 -57.3 -56.3 -57.3 70 -99 SPO 1997 10 01 02 06 24 5.5 -9 680.60 -57.2 -56.2 -57.3 69 -99 SPO 1997 10 01 02 07 23 5.5 -9 680.70 -57.2 -56.3 -57.2 68 -99 SPO 1997 10 01 02 08 24 5.2 -9 680.70 -57.2 -56.4 -57.2 68 -99 SPO 1997 10 01 02 09 24 5.5 -9 680.70 -57.2 -56.5 -57.2 69 -99 SPO 1997 10 01 02 10 24 5.5 -9 680.70 -57.2 -56.4 -57.2 69 -99 SPO 1997 10 01 02 11 25 5.5 -9 680.70 -57.2 -56.5 -57.2 69 -99 SPO 1997 10 01 02 12 25 5.5 -9 680.70 -57.1 -56.4 -57.2 70 -99 SPO 1997 10 01 02 13 26 5.5 -9 680.70 -57.1 -56.4 -57.1 70 -99 SPO 1997 10 01 02 14 26 5.5 -9 680.70 -57.1 -56.4 -57.1 70 -99 SPO 1997 10 01 02 15 26 5.5 -9 680.70 -57.1 -56.4 -57.1 70 -99 SPO 1997 10 01 02 16 26 5.4 -9 680.70 -57.1 -56.3 -57.1 70 -99 SPO 1997 10 01 02 17 26 5.5 -9 680.70 -57.0 -56.4 -57.1 69 -99 SPO 1997 10 01 02 18 26 5.4 -9 680.70 -57.0 -56.4 -57.1 69 -99 SPO 1997 10 01 02 19 26 5.6 -9 680.70 -57.0 -56.4 -57.0 69 -99 SPO 1997 10 01 02 20 26 5.8 -9 680.70 -57.0 -56.4 -57.0 69 -99 SPO 1997 10 01 02 21 26 5.9 -9 680.70 -56.9 -56.4 -57.0 68 -99 SPO 1997 10 01 02 22 26 5.8 -9 680.70 -56.9 -56.4 -57.0 69 -99 SPO 1997 10 01 02 23 26 5.7 -9 680.70 -56.9 -56.4 -56.9 69 -99 SPO 1997 10 01 02 24 25 5.6 -9 680.70 -56.9 -56.4 -56.9 71 -99 SPO 1997 10 01 02 25 26 5.5 -9 680.80 -56.9 -56.4 -56.9 71 -99 SPO 1997 10 01 02 26 25 5.6 -9 680.80 -56.8 -56.4 -56.9 70 -99 SPO 1997 10 01 02 27 26 5.4 -9 680.80 -56.8 -56.3 -56.9 68 -99 SPO 1997 10 01 02 28 25 5.4 -9 680.80 -56.8 -56.4 -56.9 68 -99 SPO 1997 10 01 02 29 24 5.4 -9 680.80 -56.8 -56.4 -56.9 68 -99 SPO 1997 10 01 02 30 24 5.3 -9 680.80 -56.8 -56.3 -56.8 68 -99 SPO 1997 10 01 02 31 24 5.5 -9 680.80 -56.8 -56.3 -56.8 68 -99 SPO 1997 10 01 02 32 24 5.5 -9 680.80 -56.7 -56.3 -56.8 68 -99 SPO 1997 10 01 02 33 25 5.5 -9 680.80 -56.7 -56.3 -56.8 69 -99 SPO 1997 10 01 02 34 26 5.2 -9 680.80 -56.7 -56.3 -56.8 69 -99 SPO 1997 10 01 02 35 25 5.2 -9 680.90 -56.7 -56.4 -56.8 69 -99 SPO 1997 10 01 02 36 26 5.2 -9 680.90 -56.7 -56.4 -56.8 69 -99 SPO 1997 10 01 02 37 25 5.1 -9 680.90 -56.7 -56.4 -56.8 71 -99 SPO 1997 10 01 02 38 26 5.3 -9 681.00 -56.7 -56.4 -56.7 69 -99 SPO 1997 10 01 02 39 26 5.1 -9 681.00 -56.6 -56.4 -56.7 68 -99 SPO 1997 10 01 02 40 26 5.0 -9 681.00 -56.6 -56.3 -56.6 68 -99 SPO 1997 10 01 02 41 24 5.0 -9 681.00 -56.6 -56.3 -56.6 68 -99 SPO 1997 10 01 02 42 25 4.9 -9 681.00 -56.6 -56.3 -56.6 68 -99 SPO 1997 10 01 02 43 24 4.8 -9 681.00 -56.6 -56.3 -56.6 68 -99 SPO 1997 10 01 02 44 23 4.8 -9 681.10 -56.6 -56.2 -56.6 68 -99 SPO 1997 10 01 02 45 22 4.6 -9 681.10 -56.6 -56.3 -56.6 68 -99 SPO 1997 10 01 02 46 22 4.7 -9 681.10 -56.5 -56.3 -56.6 69 -99 SPO 1997 10 01 02 47 23 4.8 -9 681.10 -56.5 -56.3 -56.6 69 -99 SPO 1997 10 01 02 48 22 4.8 -9 681.10 -56.5 -56.3 -56.6 69 -99 SPO 1997 10 01 02 49 22 4.9 -9 681.10 -56.5 -56.3 -56.6 69 -99 SPO 1997 10 01 02 50 21 5.1 -9 681.10 -56.5 -56.3 -56.5 69 -99 SPO 1997 10 01 02 51 20 5.1 -9 681.10 -56.5 -56.3 -56.5 69 -99 SPO 1997 10 01 02 52 20 5.3 -9 681.10 -56.4 -56.3 -56.5 69 -99 SPO 1997 10 01 02 53 19 5.2 -9 681.10 -56.4 -56.2 -56.5 69 -99 SPO 1997 10 01 02 54 19 5.2 -9 681.10 -56.4 -56.2 -56.5 67 -99 SPO 1997 10 01 02 55 19 5.3 -9 681.10 -56.4 -56.2 -56.5 69 -99 SPO 1997 10 01 02 56 20 5.2 -9 681.10 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 02 57 21 5.1 -9 681.10 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 02 58 23 5.3 -9 681.10 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 02 59 23 5.1 -9 681.10 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 00 24 5.3 -9 681.10 -56.4 -56.2 -56.5 69 0 SPO 1997 10 01 03 01 25 5.1 -9 681.10 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 02 26 5.2 -9 681.20 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 03 28 5.0 -9 681.20 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 04 29 5.0 -9 681.20 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 05 30 4.8 -9 681.20 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 06 30 5.0 -9 681.20 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 07 30 5.0 -9 681.20 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 08 29 5.1 -9 681.20 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 09 30 4.9 -9 681.20 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 10 31 5.0 -9 681.20 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 11 32 4.9 -9 681.20 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 12 34 4.6 -9 681.30 -56.4 -56.2 -56.4 71 -99 SPO 1997 10 01 03 13 35 4.4 -9 681.30 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 14 36 4.3 -9 681.40 -56.4 -56.2 -56.4 69 -99 SPO 1997 10 01 03 15 38 4.1 -9 681.40 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 16 40 3.9 -9 681.40 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 17 43 3.9 -9 681.40 -56.4 -56.4 -56.4 69 -99 SPO 1997 10 01 03 18 45 3.7 -9 681.40 -56.4 -56.4 -56.4 69 -99 SPO 1997 10 01 03 19 45 3.6 -9 681.40 -56.4 -56.5 -56.4 69 -99 SPO 1997 10 01 03 20 44 3.8 -9 681.40 -56.4 -56.4 -56.4 69 -99 SPO 1997 10 01 03 21 42 3.8 -9 681.30 -56.4 -56.4 -56.4 69 -99 SPO 1997 10 01 03 22 39 4.0 -9 681.30 -56.4 -56.4 -56.4 69 -99 SPO 1997 10 01 03 23 37 4.3 -9 681.30 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 24 35 4.6 -9 681.30 -56.4 -56.3 -56.4 69 -99 SPO 1997 10 01 03 25 35 4.2 -9 681.30 -56.4 -56.3 -56.3 69 -99 SPO 1997 10 01 03 26 37 4.1 -9 681.30 -56.3 -56.3 -56.3 69 -99 SPO 1997 10 01 03 27 37 4.2 -9 681.30 -56.3 -56.3 -56.3 68 -99 SPO 1997 10 01 03 28 36 4.5 -9 681.30 -56.3 -56.3 -56.3 68 -99 SPO 1997 10 01 03 29 34 4.7 -9 681.20 -56.3 -56.3 -56.3 68 -99 SPO 1997 10 01 03 30 33 4.7 -9 681.20 -56.3 -56.3 -56.3 69 -99 SPO 1997 10 01 03 31 33 4.5 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 32 36 4.2 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 33 37 4.1 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 34 37 4.1 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 35 35 4.2 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 36 36 4.1 -9 681.30 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 37 36 3.9 -9 681.30 -56.3 -56.4 -56.3 69 -99 SPO 1997 10 01 03 38 37 3.7 -9 681.40 -56.3 -56.4 -56.3 68 -99 SPO 1997 10 01 03 39 40 3.6 -9 681.40 -56.3 -56.4 -56.3 68 -99 SPO 1997 10 01 03 40 39 3.5 -9 681.40 -56.3 -56.4 -56.3 68 -99 SPO 1997 10 01 03 41 40 3.4 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 42 39 3.4 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 43 38 3.4 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 44 39 3.4 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 45 38 3.5 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 46 37 3.7 -9 681.40 -56.3 -56.5 -56.3 70 -99 SPO 1997 10 01 03 47 38 3.5 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 48 37 3.7 -9 681.40 -56.3 -56.4 -56.3 70 -99 SPO 1997 10 01 03 49 37 4.0 -9 681.40 -56.3 -56.4 -56.3 69 -99 SPO 1997 10 01 03 50 35 4.0 -9 681.40 -56.3 -56.4 -56.3 69 -99 SPO 1997 10 01 03 51 34 4.3 -9 681.40 -56.3 -56.4 -56.3 69 -99 SPO 1997 10 01 03 52 32 4.4 -9 681.40 -56.3 -56.3 -56.3 69 -99 SPO 1997 10 01 03 53 31 4.4 -9 681.40 -56.3 -56.3 -56.3 70 -99 SPO 1997 10 01 03 54 31 4.4 -9 681.40 -56.3 -56.3 -56.3 70 -99 SPO 1997 10 01 03 55 29 4.5 -9 681.40 -56.2 -56.3 -56.3 69 -99 SPO 1997 10 01 03 56 27 4.5 -9 681.40 -56.2 -56.2 -56.2 69 -99 SPO 1997 10 01 03 57 28 4.4 -9 681.40 -56.2 -56.2 -56.2 69 -99 SPO 1997 10 01 03 58 27 4.8 -9 681.40 -56.2 -56.2 -56.2 69 -99 SPO 1997 10 01 03 59 27 4.5 -9 681.40 -56.2 -56.3 -56.2 69 -99 SPO 1997 10 01 04 00 27 4.3 -9 681.40 -56.2 -56.3 -56.2 68 0 SPO 1997 10 01 04 01 26 4.5 -9 681.40 -56.2 -56.3 -56.2 68 -99 SPO 1997 10 01 04 02 26 4.3 -9 681.40 -56.1 -56.3 -56.2 67 -99 SPO 1997 10 01 04 03 26 4.2 -9 681.40 -56.1 -56.2 -56.2 67 -99 SPO 1997 10 01 04 04 24 4.3 -9 681.40 -56.1 -56.3 -56.2 67 -99 SPO 1997 10 01 04 05 26 4.2 -9 681.40 -56.1 -56.3 -56.2 69 -99 SPO 1997 10 01 04 06 29 4.0 -9 681.40 -56.1 -56.2 -56.2 69 -99 SPO 1997 10 01 04 07 27 4.2 -9 681.50 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 08 28 3.9 -9 681.50 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 09 27 4.2 -9 681.50 -56.1 -56.2 -56.2 69 -99 SPO 1997 10 01 04 10 26 3.6 -9 681.50 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 11 26 3.8 -9 681.60 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 12 27 3.6 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 13 26 3.6 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 14 26 3.7 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 15 25 3.6 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 16 23 3.6 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 17 25 3.6 -9 681.60 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 18 25 3.1 -9 681.70 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 19 26 3.1 -9 681.70 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 20 28 3.2 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 21 26 3.0 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 22 24 3.0 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 23 24 3.1 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 24 25 3.0 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 25 24 2.7 -9 681.80 -56.1 -56.2 -56.0 69 -99 SPO 1997 10 01 04 26 28 3.0 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 27 30 2.8 -9 681.80 -56.1 -56.3 -56.0 69 -99 SPO 1997 10 01 04 28 28 2.7 -9 681.80 -56.1 -56.3 -56.0 69 -99 SPO 1997 10 01 04 29 28 2.9 -9 681.80 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 04 30 28 3.0 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 31 26 3.1 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 32 26 3.1 -9 681.80 -56.0 -56.3 -56.1 69 -99 SPO 1997 10 01 04 33 27 3.3 -9 681.80 -56.1 -56.2 -56.1 70 -99 SPO 1997 10 01 04 34 29 2.8 -9 681.80 -56.1 -56.2 -56.1 70 -99 SPO 1997 10 01 04 35 30 3.1 -9 681.80 -56.1 -56.2 -56.1 70 -99 SPO 1997 10 01 04 36 29 3.1 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 37 31 3.0 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 38 31 2.9 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 39 32 3.1 -9 681.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 40 32 3.0 -9 681.80 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 41 32 2.9 -9 681.80 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 42 33 2.9 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 43 30 3.1 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 44 30 3.2 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 45 28 3.1 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 46 27 3.1 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 47 28 3.4 -9 681.70 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 48 29 3.4 -9 681.70 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 49 29 3.5 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 50 29 3.3 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 51 29 3.4 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 52 28 3.5 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 53 29 3.7 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 54 28 3.7 -9 681.70 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 04 55 30 3.6 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 56 31 3.3 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 57 32 3.3 -9 681.80 -56.1 -56.3 -56.1 70 -99 SPO 1997 10 01 04 58 34 3.1 -9 681.80 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 04 59 35 3.1 -9 681.80 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 05 00 33 3.0 -9 681.80 -56.1 -56.2 -56.1 69 0 SPO 1997 10 01 05 01 32 3.2 -9 681.80 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 05 02 29 3.3 -9 681.80 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 05 03 29 3.6 -9 681.80 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 05 04 27 3.7 -9 681.80 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 05 05 26 3.7 -9 681.80 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 05 06 25 3.9 -9 681.80 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 05 07 24 4.0 -9 681.80 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 08 25 4.0 -9 681.80 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 09 24 4.1 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 10 23 4.0 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 11 22 3.8 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 12 22 3.8 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 13 22 4.0 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 14 23 4.1 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 15 23 4.1 -9 681.80 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 16 22 4.2 -9 681.80 -55.9 -56.1 -56.0 69 -99 SPO 1997 10 01 05 17 20 4.2 -9 681.80 -55.9 -56.0 -56.0 69 -99 SPO 1997 10 01 05 18 20 4.3 -9 681.80 -55.9 -56.0 -56.0 69 -99 SPO 1997 10 01 05 19 20 4.6 -9 681.80 -55.9 -56.0 -56.0 69 -99 SPO 1997 10 01 05 20 19 4.3 -9 681.80 -55.9 -56.0 -56.0 69 -99 SPO 1997 10 01 05 21 19 4.2 -9 681.80 -55.9 -56.0 -56.0 69 -99 SPO 1997 10 01 05 22 19 4.2 -9 681.80 -55.9 -56.0 -56.0 67 -99 SPO 1997 10 01 05 23 19 4.5 -9 681.80 -55.9 -56.0 -56.0 67 -99 SPO 1997 10 01 05 24 18 4.3 -9 681.80 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 25 17 4.4 -9 681.80 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 26 17 4.5 -9 681.80 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 27 16 4.5 -9 681.80 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 28 16 4.3 -9 681.80 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 29 17 4.2 -9 681.90 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 30 17 4.2 -9 681.90 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 05 31 18 4.2 -9 681.90 -55.9 -56.1 -56.0 69 -99 SPO 1997 10 01 05 32 17 4.3 -9 681.90 -55.9 -56.1 -56.0 69 -99 SPO 1997 10 01 05 33 17 4.1 -9 681.90 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 34 16 4.0 -9 681.90 -55.9 -56.0 -56.0 67 -99 SPO 1997 10 01 05 35 17 4.0 -9 681.90 -55.9 -56.0 -56.0 67 -99 SPO 1997 10 01 05 36 18 4.0 -9 681.90 -55.9 -56.0 -56.0 65 -99 SPO 1997 10 01 05 37 18 4.1 -9 681.90 -55.9 -56.0 -55.9 65 -99 SPO 1997 10 01 05 38 17 3.8 -9 681.90 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 39 18 4.1 -9 681.90 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 40 19 4.0 -9 681.90 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 41 20 4.0 -9 681.90 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 42 20 4.0 -9 681.90 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 43 20 3.9 -9 682.00 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 44 19 4.2 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 45 19 4.1 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 46 19 4.2 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 47 20 4.0 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 48 22 4.0 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 49 23 3.9 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 50 22 4.2 -9 682.00 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 51 23 3.8 -9 682.10 -55.9 -56.1 -56.0 67 -99 SPO 1997 10 01 05 52 23 4.0 -9 682.10 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 53 25 4.2 -9 682.10 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 05 54 24 3.9 -9 682.10 -55.9 -56.2 -56.0 69 -99 SPO 1997 10 01 05 55 26 3.9 -9 682.10 -55.9 -56.2 -56.0 69 -99 SPO 1997 10 01 05 56 26 3.9 -9 682.10 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 05 57 29 3.5 -9 682.10 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 05 58 29 3.5 -9 682.20 -55.9 -56.2 -56.0 67 -99 SPO 1997 10 01 05 59 30 3.5 -9 682.20 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 00 33 3.5 -9 682.20 -56.0 -56.2 -56.0 68 0 SPO 1997 10 01 06 01 34 3.4 -9 682.20 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 06 02 33 3.2 -9 682.30 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 06 03 35 3.3 -9 682.30 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 06 04 35 3.3 -9 682.30 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 06 05 35 3.3 -9 682.30 -56.0 -56.1 -56.0 69 -99 SPO 1997 10 01 06 06 35 3.5 -9 682.30 -56.0 -56.1 -56.0 68 -99 SPO 1997 10 01 06 07 33 3.7 -9 682.30 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 08 32 3.9 -9 682.30 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 09 31 3.9 -9 682.30 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 10 29 3.8 -9 682.30 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 11 29 3.8 -9 682.30 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 06 12 28 3.7 -9 682.30 -56.0 -56.2 -56.0 68 -99 SPO 1997 10 01 06 13 29 3.8 -9 682.40 -56.0 -56.2 -56.1 68 -99 SPO 1997 10 01 06 14 28 3.8 -9 682.40 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 06 15 26 3.9 -9 682.40 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 06 16 26 4.0 -9 682.30 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 06 17 27 4.0 -9 682.40 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 06 18 27 3.9 -9 682.40 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 06 19 27 3.9 -9 682.40 -56.1 -56.1 -56.1 69 -99 SPO 1997 10 01 06 20 29 3.7 -9 682.40 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 21 29 3.6 -9 682.40 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 22 30 3.6 -9 682.40 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 23 30 3.2 -9 682.40 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 24 29 3.3 -9 682.50 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 25 30 3.3 -9 682.50 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 26 30 3.4 -9 682.50 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 27 32 3.2 -9 682.50 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 28 32 3.5 -9 682.50 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 29 32 3.4 -9 682.50 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 30 31 3.5 -9 682.50 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 06 31 30 3.5 -9 682.50 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 06 32 31 3.2 -9 682.50 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 06 33 32 3.3 -9 682.50 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 34 32 3.2 -9 682.60 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 35 32 3.2 -9 682.60 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 36 33 3.3 -9 682.60 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 37 33 3.2 -9 682.60 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 38 35 3.1 -9 682.70 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 39 35 3.2 -9 682.70 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 40 34 3.4 -9 682.70 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 41 33 3.4 -9 682.70 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 42 33 3.4 -9 682.70 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 43 33 3.6 -9 682.70 -56.1 -56.3 -56.1 67 -99 SPO 1997 10 01 06 44 34 3.7 -9 682.70 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 45 34 3.8 -9 682.70 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 46 33 3.6 -9 682.70 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 47 33 3.8 -9 682.70 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 48 34 3.6 -9 682.80 -56.1 -56.2 -56.1 66 -99 SPO 1997 10 01 06 49 35 3.5 -9 682.80 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 06 50 35 3.3 -9 682.80 -56.2 -56.2 -56.1 69 -99 SPO 1997 10 01 06 51 36 3.2 -9 682.80 -56.2 -56.3 -56.1 69 -99 SPO 1997 10 01 06 52 38 3.1 -9 682.80 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 06 53 36 3.0 -9 682.80 -56.2 -56.3 -56.1 68 -99 SPO 1997 10 01 06 54 34 3.0 -9 682.80 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 55 35 2.9 -9 682.90 -56.1 -56.3 -56.1 66 -99 SPO 1997 10 01 06 56 36 2.8 -9 682.90 -56.2 -56.3 -56.1 67 -99 SPO 1997 10 01 06 57 38 2.6 -9 682.90 -56.2 -56.3 -56.1 67 -99 SPO 1997 10 01 06 58 41 2.4 -9 682.90 -56.2 -56.2 -56.1 67 -99 SPO 1997 10 01 06 59 40 2.4 -9 682.90 -56.2 -56.2 -56.1 67 -99 SPO 1997 10 01 07 00 45 2.3 -9 682.90 -56.2 -56.2 -56.1 67 0 SPO 1997 10 01 07 01 49 2.3 -9 682.90 -56.2 -56.2 -56.1 67 -99 SPO 1997 10 01 07 02 54 2.3 -9 682.90 -56.2 -56.2 -56.1 67 -99 SPO 1997 10 01 07 03 58 2.1 -9 683.00 -56.2 -56.2 -56.1 67 -99 SPO 1997 10 01 07 04 63 1.9 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 05 60 1.9 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 06 61 1.9 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 07 64 1.7 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 08 64 1.7 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 09 68 1.7 -9 683.00 -56.3 -56.3 -56.1 68 -99 SPO 1997 10 01 07 10 71 1.8 -9 683.10 -56.4 -56.4 -56.1 69 -99 SPO 1997 10 01 07 11 78 1.6 -9 683.10 -56.4 -56.4 -56.1 69 -99 SPO 1997 10 01 07 12 90 1.2 -9 683.10 -56.4 -56.4 -56.2 69 -99 SPO 1997 10 01 07 13 104 0.7 -9 683.10 -56.6 -56.3 -56.4 71 -99 SPO 1997 10 01 07 14 104 0.8 -9 683.10 -56.8 -56.4 -56.6 72 -99 SPO 1997 10 01 07 15 101 0.9 -9 683.10 -57.0 -56.5 -56.8 72 -99 SPO 1997 10 01 07 16 99 1.2 -9 683.10 -57.2 -56.5 -56.9 74 -99 SPO 1997 10 01 07 17 102 1.2 -9 683.10 -57.2 -56.4 -57.0 72 -99 SPO 1997 10 01 07 18 101 1.2 -9 683.10 -57.3 -56.6 -57.0 72 -99 SPO 1997 10 01 07 19 104 1.2 -9 683.10 -57.3 -56.7 -56.9 70 -99 SPO 1997 10 01 07 20 104 1.2 -9 683.10 -57.4 -56.8 -56.9 71 -99 SPO 1997 10 01 07 21 95 1.1 -9 683.10 -57.4 -56.8 -56.9 71 -99 SPO 1997 10 01 07 22 104 1.3 -9 683.20 -57.4 -56.7 -56.9 71 -99 SPO 1997 10 01 07 23 102 1.3 -9 683.20 -57.4 -56.8 -57.0 71 -99 SPO 1997 10 01 07 24 93 1.4 -9 683.20 -57.4 -56.8 -57.0 71 -99 SPO 1997 10 01 07 25 90 1.4 -9 683.20 -57.4 -56.8 -57.0 71 -99 SPO 1997 10 01 07 26 86 1.5 -9 683.20 -57.4 -56.7 -56.9 71 -99 SPO 1997 10 01 07 27 80 1.6 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 28 73 1.8 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 29 71 1.8 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 30 73 1.9 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 31 75 1.9 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 32 72 1.9 -9 683.10 -57.4 -56.7 -56.8 71 -99 SPO 1997 10 01 07 33 68 1.9 -9 683.10 -57.4 -56.8 -56.9 71 -99 SPO 1997 10 01 07 34 67 1.9 -9 683.20 -57.4 -56.8 -56.9 71 -99 SPO 1997 10 01 07 35 63 2.0 -9 683.10 -57.4 -56.7 -56.9 71 -99 SPO 1997 10 01 07 36 61 2.1 -9 683.10 -57.4 -56.7 -56.9 71 -99 SPO 1997 10 01 07 37 64 2.0 -9 683.20 -57.4 -56.7 -56.9 71 -99 SPO 1997 10 01 07 38 64 2.1 -9 683.20 -57.3 -56.8 -56.9 72 -99 SPO 1997 10 01 07 39 59 2.2 -9 683.20 -57.3 -56.8 -56.9 72 -99 SPO 1997 10 01 07 40 52 2.3 -9 683.10 -57.3 -56.7 -57.0 72 -99 SPO 1997 10 01 07 41 49 2.4 -9 683.10 -57.3 -56.7 -57.0 72 -99 SPO 1997 10 01 07 42 48 2.3 -9 683.10 -57.3 -56.7 -56.9 72 -99 SPO 1997 10 01 07 43 47 2.4 -9 683.10 -57.3 -56.6 -56.9 70 -99 SPO 1997 10 01 07 44 44 2.4 -9 683.10 -57.3 -56.6 -57.0 70 -99 SPO 1997 10 01 07 45 44 2.4 -9 683.20 -57.3 -56.6 -56.9 70 -99 SPO 1997 10 01 07 46 43 2.3 -9 683.20 -57.3 -56.6 -56.9 70 -99 SPO 1997 10 01 07 47 40 2.3 -9 683.20 -57.2 -56.6 -56.9 69 -99 SPO 1997 10 01 07 48 39 2.2 -9 683.20 -57.2 -56.6 -56.9 69 -99 SPO 1997 10 01 07 49 36 2.4 -9 683.20 -57.2 -56.6 -56.9 71 -99 SPO 1997 10 01 07 50 35 2.4 -9 683.20 -57.2 -56.6 -56.9 71 -99 SPO 1997 10 01 07 51 34 2.5 -9 683.20 -57.2 -56.6 -56.9 71 -99 SPO 1997 10 01 07 52 35 2.4 -9 683.20 -57.2 -56.6 -56.9 71 -99 SPO 1997 10 01 07 53 35 2.3 -9 683.20 -57.2 -56.5 -56.9 71 -99 SPO 1997 10 01 07 54 33 2.6 -9 683.20 -57.1 -56.5 -56.9 70 -99 SPO 1997 10 01 07 55 30 2.6 -9 683.20 -57.1 -56.5 -56.8 70 -99 SPO 1997 10 01 07 56 28 2.8 -9 683.20 -57.0 -56.4 -56.8 69 -99 SPO 1997 10 01 07 57 31 3.1 -9 683.20 -56.9 -56.4 -56.7 68 -99 SPO 1997 10 01 07 58 32 3.5 -9 683.20 -56.7 -56.4 -56.6 67 -99 SPO 1997 10 01 07 59 33 3.2 -9 683.20 -56.6 -56.4 -56.5 67 -99 SPO 1997 10 01 08 00 33 3.3 -9 683.20 -56.5 -56.5 -56.4 68 0 SPO 1997 10 01 08 01 33 3.1 -9 683.20 -56.4 -56.5 -56.4 67 -99 SPO 1997 10 01 08 02 32 3.0 -9 683.20 -56.4 -56.5 -56.4 69 -99 SPO 1997 10 01 08 03 33 3.0 -9 683.30 -56.4 -56.5 -56.4 69 -99 SPO 1997 10 01 08 04 37 2.9 -9 683.30 -56.4 -56.5 -56.4 69 -99 SPO 1997 10 01 08 05 37 3.0 -9 683.30 -56.4 -56.5 -56.3 69 -99 SPO 1997 10 01 08 06 37 3.0 -9 683.30 -56.3 -56.5 -56.3 69 -99 SPO 1997 10 01 08 07 37 3.1 -9 683.30 -56.3 -56.5 -56.3 69 -99 SPO 1997 10 01 08 08 37 3.4 -9 683.30 -56.3 -56.5 -56.3 69 -99 SPO 1997 10 01 08 09 37 3.5 -9 683.30 -56.3 -56.4 -56.3 68 -99 SPO 1997 10 01 08 10 35 3.6 -9 683.30 -56.3 -56.4 -56.3 68 -99 SPO 1997 10 01 08 11 35 3.7 -9 683.30 -56.3 -56.4 -56.2 68 -99 SPO 1997 10 01 08 12 35 3.9 -9 683.30 -56.3 -56.3 -56.2 69 -99 SPO 1997 10 01 08 13 34 3.9 -9 683.30 -56.2 -56.3 -56.2 69 -99 SPO 1997 10 01 08 14 34 3.8 -9 683.30 -56.2 -56.3 -56.2 69 -99 SPO 1997 10 01 08 15 34 3.7 -9 683.30 -56.2 -56.4 -56.2 68 -99 SPO 1997 10 01 08 16 32 3.8 -9 683.30 -56.2 -56.4 -56.2 69 -99 SPO 1997 10 01 08 17 31 4.0 -9 683.20 -56.2 -56.4 -56.2 69 -99 SPO 1997 10 01 08 18 29 4.0 -9 683.20 -56.2 -56.4 -56.2 69 -99 SPO 1997 10 01 08 19 30 4.1 -9 683.30 -56.1 -56.4 -56.2 67 -99 SPO 1997 10 01 08 20 30 4.0 -9 683.30 -56.2 -56.4 -56.2 69 -99 SPO 1997 10 01 08 21 30 4.0 -9 683.30 -56.2 -56.3 -56.2 68 -99 SPO 1997 10 01 08 22 31 4.0 -9 683.30 -56.1 -56.2 -56.1 67 -99 SPO 1997 10 01 08 23 32 4.1 -9 683.30 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 08 24 32 3.9 -9 683.30 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 08 25 33 3.9 -9 683.30 -56.1 -56.2 -56.1 69 -99 SPO 1997 10 01 08 26 33 3.5 -9 683.30 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 08 27 35 3.7 -9 683.40 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 08 28 35 3.4 -9 683.40 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 08 29 34 3.3 -9 683.40 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 08 30 37 3.7 -9 683.40 -56.1 -56.3 -56.1 69 -99 SPO 1997 10 01 08 31 39 3.4 -9 683.40 -56.1 -56.4 -56.1 69 -99 SPO 1997 10 01 08 32 39 3.4 -9 683.40 -56.1 -56.4 -56.1 67 -99 SPO 1997 10 01 08 33 40 3.5 -9 683.40 -56.0 -56.3 -56.0 66 -99 SPO 1997 10 01 08 34 39 3.4 -9 683.40 -56.1 -56.3 -56.0 69 -99 SPO 1997 10 01 08 35 38 3.2 -9 683.50 -56.1 -56.3 -56.0 69 -99 SPO 1997 10 01 08 36 38 3.2 -9 683.50 -56.0 -56.3 -56.0 68 -99 SPO 1997 10 01 08 37 38 2.9 -9 683.50 -56.0 -56.3 -56.0 68 -99 SPO 1997 10 01 08 38 37 3.2 -9 683.50 -56.0 -56.3 -56.0 69 -99 SPO 1997 10 01 08 39 40 3.1 -9 683.50 -56.0 -56.2 -56.0 69 -99 SPO 1997 10 01 08 40 39 3.1 -9 683.50 -56.0 -56.2 -56.0 69 -99 SPO 1997 10 01 08 41 38 3.2 -9 683.50 -56.0 -56.2 -55.9 69 -99 SPO 1997 10 01 08 42 36 3.2 -9 683.50 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 43 34 3.5 -9 683.50 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 44 32 3.5 -9 683.40 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 45 30 3.4 -9 683.40 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 46 27 3.7 -9 683.40 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 47 27 3.8 -9 683.40 -55.8 -56.2 -55.9 68 -99 SPO 1997 10 01 08 48 24 4.1 -9 683.40 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 49 25 4.0 -9 683.40 -55.9 -56.2 -55.9 69 -99 SPO 1997 10 01 08 50 26 4.0 -9 683.40 -55.9 -56.2 -55.9 71 -99 SPO 1997 10 01 08 51 26 4.2 -9 683.40 -55.8 -56.2 -55.8 69 -99 SPO 1997 10 01 08 52 25 4.1 -9 683.40 -55.8 -56.2 -55.8 69 -99 SPO 1997 10 01 08 53 25 4.3 -9 683.40 -55.8 -56.2 -55.8 69 -99 SPO 1997 10 01 08 54 25 4.2 -9 683.40 -55.8 -56.1 -55.8 68 -99 SPO 1997 10 01 08 55 25 4.2 -9 683.40 -55.8 -56.1 -55.8 68 -99 SPO 1997 10 01 08 56 24 4.2 -9 683.40 -55.7 -56.0 -55.8 67 -99 SPO 1997 10 01 08 57 23 4.5 -9 683.40 -55.7 -56.0 -55.8 67 -99 SPO 1997 10 01 08 58 24 4.5 -9 683.40 -55.7 -56.0 -55.8 67 -99 SPO 1997 10 01 08 59 23 4.8 -9 683.40 -55.7 -56.1 -55.8 67 -99 SPO 1997 10 01 09 00 24 4.4 -9 683.40 -55.7 -56.1 -55.8 67 0 SPO 1997 10 01 09 01 24 4.4 -9 683.40 -55.7 -56.1 -55.8 67 -99 SPO 1997 10 01 09 02 23 4.6 -9 683.50 -55.7 -56.1 -55.7 68 -99 SPO 1997 10 01 09 03 22 4.5 -9 683.50 -55.7 -56.0 -55.7 68 -99 SPO 1997 10 01 09 04 22 4.7 -9 683.50 -55.7 -56.0 -55.7 68 -99 SPO 1997 10 01 09 05 20 4.4 -9 683.50 -55.7 -56.0 -55.7 68 -99 SPO 1997 10 01 09 06 20 4.3 -9 683.50 -55.6 -56.0 -55.7 67 -99 SPO 1997 10 01 09 07 21 4.3 -9 683.50 -55.6 -56.0 -55.7 66 -99 SPO 1997 10 01 09 08 22 4.4 -9 683.50 -55.6 -56.0 -55.6 66 -99 SPO 1997 10 01 09 09 21 4.4 -9 683.50 -55.6 -55.9 -55.6 66 -99 SPO 1997 10 01 09 10 22 4.7 -9 683.60 -55.6 -55.9 -55.6 67 -99 SPO 1997 10 01 09 11 21 4.7 -9 683.60 -55.6 -55.9 -55.6 67 -99 SPO 1997 10 01 09 12 22 4.2 -9 683.60 -55.5 -55.9 -55.6 66 -99 SPO 1997 10 01 09 13 23 4.1 -9 683.60 -55.5 -55.9 -55.6 68 -99 SPO 1997 10 01 09 14 23 4.1 -9 683.70 -55.5 -55.9 -55.6 68 -99 SPO 1997 10 01 09 15 24 3.8 -9 683.70 -55.5 -55.9 -55.6 68 -99 SPO 1997 10 01 09 16 23 3.8 -9 683.70 -55.5 -55.9 -55.6 68 -99 SPO 1997 10 01 09 17 26 3.6 -9 683.70 -55.5 -55.9 -55.6 68 -99 SPO 1997 10 01 09 18 24 3.5 -9 683.70 -55.5 -55.9 -55.5 68 -99 SPO 1997 10 01 09 19 26 3.5 -9 683.70 -55.5 -55.8 -55.5 68 -99 SPO 1997 10 01 09 20 24 3.6 -9 683.60 -55.5 -55.8 -55.5 68 -99 SPO 1997 10 01 09 21 25 3.4 -9 683.70 -55.4 -55.8 -55.5 67 -99 SPO 1997 10 01 09 22 25 3.2 -9 683.70 -55.4 -55.8 -55.5 67 -99 SPO 1997 10 01 09 23 26 3.5 -9 683.70 -55.4 -55.8 -55.4 69 -99 SPO 1997 10 01 09 24 27 3.5 -9 683.70 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 25 25 3.8 -9 683.60 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 26 27 3.7 -9 683.70 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 27 26 3.6 -9 683.60 -55.4 -55.8 -55.4 69 -99 SPO 1997 10 01 09 28 25 3.5 -9 683.70 -55.4 -55.8 -55.4 69 -99 SPO 1997 10 01 09 29 23 3.7 -9 683.60 -55.4 -55.8 -55.4 69 -99 SPO 1997 10 01 09 30 23 3.4 -9 683.70 -55.4 -55.8 -55.4 69 -99 SPO 1997 10 01 09 31 22 3.5 -9 683.70 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 32 24 3.5 -9 683.60 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 33 24 3.5 -9 683.70 -55.4 -55.7 -55.4 69 -99 SPO 1997 10 01 09 34 25 3.6 -9 683.70 -55.3 -55.7 -55.4 68 -99 SPO 1997 10 01 09 35 24 3.8 -9 683.70 -55.3 -55.7 -55.4 68 -99 SPO 1997 10 01 09 36 25 3.4 -9 683.70 -55.3 -55.7 -55.4 68 -99 SPO 1997 10 01 09 37 25 3.2 -9 683.70 -55.3 -55.7 -55.3 69 -99 SPO 1997 10 01 09 38 24 3.0 -9 683.80 -55.3 -55.7 -55.3 69 -99 SPO 1997 10 01 09 39 26 3.1 -9 683.80 -55.3 -55.6 -55.3 69 -99 SPO 1997 10 01 09 40 27 3.2 -9 683.80 -55.2 -55.6 -55.3 67 -99 SPO 1997 10 01 09 41 22 3.5 -9 683.80 -55.2 -55.6 -55.3 67 -99 SPO 1997 10 01 09 42 22 3.4 -9 683.80 -55.2 -55.7 -55.3 67 -99 SPO 1997 10 01 09 43 21 3.6 -9 683.80 -55.2 -55.7 -55.3 67 -99 SPO 1997 10 01 09 44 20 3.7 -9 683.80 -55.2 -55.7 -55.3 67 -99 SPO 1997 10 01 09 45 22 3.5 -9 683.80 -55.3 -55.7 -55.3 68 -99 SPO 1997 10 01 09 46 22 3.4 -9 683.80 -55.2 -55.6 -55.3 68 -99 SPO 1997 10 01 09 47 23 3.2 -9 683.80 -55.2 -55.6 -55.3 68 -99 SPO 1997 10 01 09 48 22 3.8 -9 683.80 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 49 20 4.1 -9 683.80 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 50 17 4.1 -9 683.80 -55.2 -55.6 -55.3 70 -99 SPO 1997 10 01 09 51 20 3.9 -9 683.80 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 52 14 4.0 -9 683.70 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 53 16 4.0 -9 683.70 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 54 16 4.4 -9 683.70 -55.1 -55.5 -55.2 69 -99 SPO 1997 10 01 09 55 17 4.3 -9 683.70 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 56 16 4.6 -9 683.70 -55.1 -55.6 -55.2 69 -99 SPO 1997 10 01 09 57 14 4.4 -9 683.70 -55.1 -55.6 -55.2 69 -99 SPO 1997 10 01 09 58 12 4.6 -9 683.70 -55.2 -55.6 -55.2 70 -99 SPO 1997 10 01 09 59 10 4.3 -9 683.60 -55.1 -55.6 -55.2 69 -99 SPO 1997 10 01 10 00 13 4.7 -9 683.70 -55.1 -55.6 -55.2 71 0 SPO 1997 10 01 10 01 13 4.4 -9 683.70 -55.1 -55.6 -55.2 71 -99 SPO 1997 10 01 10 02 14 4.3 -9 683.60 -55.1 -55.6 -55.2 71 -99 SPO 1997 10 01 10 03 14 4.5 -9 683.70 -55.1 -55.5 -55.1 69 -99 SPO 1997 10 01 10 04 14 4.2 -9 683.60 -55.1 -55.5 -55.1 69 -99 SPO 1997 10 01 10 05 14 4.7 -9 683.70 -55.0 -55.5 -55.1 68 -99 SPO 1997 10 01 10 06 17 4.7 -9 683.70 -55.0 -55.5 -55.1 68 -99 SPO 1997 10 01 10 07 15 4.4 -9 683.70 -55.0 -55.4 -55.1 68 -99 SPO 1997 10 01 10 08 17 4.6 -9 683.70 -55.0 -55.4 -55.0 68 -99 SPO 1997 10 01 10 09 16 5.2 -9 683.60 -55.0 -55.4 -55.1 68 -99 SPO 1997 10 01 10 10 15 4.9 -9 683.60 -55.0 -55.4 -55.1 68 -99 SPO 1997 10 01 10 11 17 4.8 -9 683.70 -55.0 -55.4 -55.0 70 -99 SPO 1997 10 01 10 12 16 5.0 -9 683.70 -55.0 -55.4 -55.0 70 -99 SPO 1997 10 01 10 13 13 4.6 -9 683.70 -55.0 -55.4 -55.0 70 -99 SPO 1997 10 01 10 14 17 5.0 -9 683.80 -55.0 -55.4 -55.0 70 -99 SPO 1997 10 01 10 15 17 4.9 -9 683.80 -55.0 -55.4 -55.0 68 -99 SPO 1997 10 01 10 16 17 4.9 -9 683.80 -54.9 -55.4 -55.0 67 -99 SPO 1997 10 01 10 17 16 4.7 -9 683.80 -54.9 -55.4 -55.0 67 -99 SPO 1997 10 01 10 18 14 4.8 -9 683.80 -54.9 -55.3 -55.0 67 -99 SPO 1997 10 01 10 19 18 4.8 -9 683.80 -54.9 -55.3 -55.0 67 -99 SPO 1997 10 01 10 20 16 5.0 -9 683.80 -54.9 -55.3 -54.9 67 -99 SPO 1997 10 01 10 21 16 4.8 -9 683.80 -54.8 -55.2 -54.9 68 -99 SPO 1997 10 01 10 22 15 4.6 -9 683.80 -54.8 -55.2 -54.9 68 -99 SPO 1997 10 01 10 23 16 4.3 -9 683.90 -54.8 -55.2 -54.9 68 -99 SPO 1997 10 01 10 24 18 4.4 -9 683.90 -54.7 -55.2 -54.8 68 -99 SPO 1997 10 01 10 25 20 4.1 -9 683.90 -54.8 -55.2 -54.8 69 -99 SPO 1997 10 01 10 26 20 4.2 -9 683.90 -54.8 -55.2 -54.8 69 -99 SPO 1997 10 01 10 27 22 4.4 -9 683.90 -54.8 -55.2 -54.8 69 -99 SPO 1997 10 01 10 28 17 4.2 -9 683.90 -54.8 -55.2 -54.8 69 -99 SPO 1997 10 01 10 29 16 4.4 -9 683.90 -54.7 -55.2 -54.8 67 -99 SPO 1997 10 01 10 30 16 4.2 -9 683.90 -54.7 -55.2 -54.8 68 -99 SPO 1997 10 01 10 31 18 4.1 -9 683.90 -54.7 -55.1 -54.8 68 -99 SPO 1997 10 01 10 32 13 4.4 -9 683.90 -54.6 -55.1 -54.7 69 -99 SPO 1997 10 01 10 33 14 4.5 -9 683.90 -54.6 -55.1 -54.7 69 -99 SPO 1997 10 01 10 34 9 4.2 -9 684.00 -54.7 -55.1 -54.7 70 -99 SPO 1997 10 01 10 35 13 3.9 -9 683.90 -54.6 -55.0 -54.7 71 -99 SPO 1997 10 01 10 36 14 4.2 -9 684.00 -54.6 -55.0 -54.7 71 -99 SPO 1997 10 01 10 37 11 4.4 -9 684.00 -54.6 -55.1 -54.7 71 -99 SPO 1997 10 01 10 38 9 4.2 -9 684.00 -54.6 -55.1 -54.8 69 -99 SPO 1997 10 01 10 39 9 4.0 -9 684.00 -54.6 -55.1 -54.7 69 -99 SPO 1997 10 01 10 40 8 3.9 -9 684.00 -54.6 -55.1 -54.7 69 -99 SPO 1997 10 01 10 41 9 4.0 -9 684.10 -54.6 -55.0 -54.7 69 -99 SPO 1997 10 01 10 42 7 3.8 -9 684.00 -54.6 -55.0 -54.7 69 -99 SPO 1997 10 01 10 43 10 3.7 -9 684.00 -54.6 -55.0 -54.6 71 -99 SPO 1997 10 01 10 44 10 3.8 -9 684.00 -54.6 -55.0 -54.6 71 -99 SPO 1997 10 01 10 45 13 3.9 -9 684.00 -54.6 -55.0 -54.6 71 -99 SPO 1997 10 01 10 46 8 3.6 -9 684.10 -54.6 -55.0 -54.6 71 -99 SPO 1997 10 01 10 47 10 3.6 -9 684.10 -54.5 -55.0 -54.6 70 -99 SPO 1997 10 01 10 48 11 3.6 -9 684.10 -54.5 -54.9 -54.6 70 -99 SPO 1997 10 01 10 49 8 3.7 -9 684.10 -54.5 -54.9 -54.6 70 -99 SPO 1997 10 01 10 50 9 3.5 -9 684.10 -54.5 -54.9 -54.5 70 -99 SPO 1997 10 01 10 51 14 3.4 -9 684.10 -54.4 -54.9 -54.5 69 -99 SPO 1997 10 01 10 52 15 3.6 -9 684.20 -54.4 -54.9 -54.5 69 -99 SPO 1997 10 01 10 53 10 3.6 -9 684.20 -54.4 -54.9 -54.5 69 -99 SPO 1997 10 01 10 54 12 3.5 -9 684.20 -54.5 -54.9 -54.5 71 -99 SPO 1997 10 01 10 55 11 3.6 -9 684.20 -54.5 -54.9 -54.6 72 -99 SPO 1997 10 01 10 56 12 3.8 -9 684.20 -54.5 -54.9 -54.5 72 -99 SPO 1997 10 01 10 57 9 3.7 -9 684.20 -54.5 -54.9 -54.5 72 -99 SPO 1997 10 01 10 58 12 3.3 -9 684.30 -54.4 -54.8 -54.5 72 -99 SPO 1997 10 01 10 59 14 3.4 -9 684.30 -54.4 -54.8 -54.5 72 -99 SPO 1997 10 01 11 00 14 3.3 -9 684.30 -54.4 -54.8 -54.4 72 0 SPO 1997 10 01 11 01 8 3.0 -9 684.30 -54.4 -54.8 -54.4 72 -99 SPO 1997 10 01 11 02 14 3.1 -9 684.30 -54.3 -54.8 -54.4 71 -99 SPO 1997 10 01 11 03 13 3.3 -9 684.30 -54.3 -54.8 -54.4 71 -99 SPO 1997 10 01 11 04 12 3.3 -9 684.30 -54.4 -54.8 -54.4 72 -99 SPO 1997 10 01 11 05 10 3.1 -9 684.30 -54.4 -54.8 -54.4 72 -99 SPO 1997 10 01 11 06 9 3.0 -9 684.40 -54.3 -54.8 -54.5 71 -99 SPO 1997 10 01 11 07 9 3.1 -9 684.40 -54.3 -54.8 -54.4 71 -99 SPO 1997 10 01 11 08 9 2.9 -9 684.40 -54.4 -54.8 -54.4 72 -99 SPO 1997 10 01 11 09 9 2.9 -9 684.40 -54.3 -54.8 -54.4 72 -99 SPO 1997 10 01 11 10 9 3.4 -9 684.40 -54.3 -54.8 -54.3 72 -99 SPO 1997 10 01 11 11 9 3.4 -9 684.40 -54.3 -54.8 -54.4 72 -99 SPO 1997 10 01 11 12 9 3.2 -9 684.40 -54.3 -54.8 -54.4 72 -99 SPO 1997 10 01 11 13 9 3.2 -9 684.40 -54.3 -54.8 -54.4 72 -99 SPO 1997 10 01 11 14 9 3.5 -9 684.40 -54.3 -54.7 -54.3 72 -99 SPO 1997 10 01 11 15 10 3.8 -9 684.30 -54.3 -54.7 -54.3 72 -99 SPO 1997 10 01 11 16 10 3.9 -9 684.30 -54.2 -54.6 -54.3 72 -99 SPO 1997 10 01 11 17 14 4.0 -9 684.30 -54.2 -54.7 -54.3 72 -99 SPO 1997 10 01 11 18 12 4.1 -9 684.40 -54.2 -54.6 -54.3 72 -99 SPO 1997 10 01 11 19 12 3.8 -9 684.30 -54.2 -54.6 -54.3 74 -99 SPO 1997 10 01 11 20 12 3.8 -9 684.30 -54.2 -54.6 -54.3 74 -99 SPO 1997 10 01 11 21 11 4.1 -9 684.40 -54.1 -54.6 -54.3 73 -99 SPO 1997 10 01 11 22 10 3.9 -9 684.40 -54.2 -54.6 -54.2 72 -99 SPO 1997 10 01 11 23 9 3.9 -9 684.40 -54.2 -54.6 -54.2 74 -99 SPO 1997 10 01 11 24 8 3.8 -9 684.40 -54.2 -54.6 -54.2 72 -99 SPO 1997 10 01 11 25 11 4.0 -9 684.40 -54.1 -54.6 -54.2 72 -99 SPO 1997 10 01 11 26 11 4.0 -9 684.40 -54.1 -54.6 -54.2 72 -99 SPO 1997 10 01 11 27 11 4.1 -9 684.40 -54.1 -54.5 -54.1 72 -99 SPO 1997 10 01 11 28 9 4.1 -9 684.40 -54.1 -54.5 -54.2 72 -99 SPO 1997 10 01 11 29 8 4.0 -9 684.40 -54.0 -54.5 -54.1 72 -99 SPO 1997 10 01 11 30 12 3.6 -9 684.40 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 31 11 3.9 -9 684.40 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 32 13 3.9 -9 684.40 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 33 17 4.0 -9 684.40 -54.0 -54.5 -54.1 72 -99 SPO 1997 10 01 11 34 13 4.1 -9 684.40 -54.1 -54.5 -54.2 73 -99 SPO 1997 10 01 11 35 14 3.9 -9 684.40 -54.1 -54.4 -54.2 73 -99 SPO 1997 10 01 11 36 15 3.7 -9 684.50 -54.0 -54.4 -54.1 71 -99 SPO 1997 10 01 11 37 16 4.2 -9 684.50 -54.0 -54.4 -54.1 71 -99 SPO 1997 10 01 11 38 13 4.3 -9 684.50 -54.0 -54.5 -54.1 71 -99 SPO 1997 10 01 11 39 12 4.3 -9 684.50 -54.0 -54.5 -54.1 71 -99 SPO 1997 10 01 11 40 12 4.1 -9 684.50 -54.0 -54.5 -54.1 71 -99 SPO 1997 10 01 11 41 15 4.1 -9 684.50 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 42 15 4.2 -9 684.50 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 43 14 3.8 -9 684.50 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 44 15 4.1 -9 684.50 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 45 10 4.0 -9 684.50 -53.9 -54.4 -54.0 72 -99 SPO 1997 10 01 11 46 15 4.0 -9 684.50 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 11 47 12 4.0 -9 684.40 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 11 48 12 4.3 -9 684.40 -53.9 -54.3 -54.0 70 -99 SPO 1997 10 01 11 49 13 4.2 -9 684.40 -53.9 -54.4 -54.0 70 -99 SPO 1997 10 01 11 50 15 4.2 -9 684.40 -54.0 -54.4 -54.0 71 -99 SPO 1997 10 01 11 51 11 4.5 -9 684.40 -54.0 -54.4 -54.0 71 -99 SPO 1997 10 01 11 52 10 4.3 -9 684.40 -54.0 -54.4 -54.1 71 -99 SPO 1997 10 01 11 53 10 4.4 -9 684.40 -54.0 -54.4 -54.1 72 -99 SPO 1997 10 01 11 54 9 3.9 -9 684.40 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 55 11 3.6 -9 684.50 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 56 7 3.7 -9 684.50 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 57 10 3.5 -9 684.60 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 58 9 3.6 -9 684.60 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 11 59 9 3.6 -9 684.50 -54.0 -54.4 -54.0 72 -99 SPO 1997 10 01 12 00 8 3.4 -9 684.60 -54.0 -54.4 -54.0 72 0 SPO 1997 10 01 12 01 10 3.6 -9 684.60 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 02 8 3.5 -9 684.60 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 03 5 3.3 -9 684.60 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 04 6 3.0 -9 684.60 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 05 10 3.4 -9 684.50 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 06 9 3.8 -9 684.50 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 07 11 4.3 -9 684.40 -53.9 -54.4 -54.0 73 -99 SPO 1997 10 01 12 08 9 4.2 -9 684.40 -53.9 -54.4 -54.0 72 -99 SPO 1997 10 01 12 09 8 4.4 -9 684.40 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 10 6 4.4 -9 684.40 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 11 7 4.1 -9 684.40 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 12 6 4.5 -9 684.40 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 13 6 4.5 -9 684.50 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 14 7 4.0 -9 684.50 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 15 9 4.2 -9 684.50 -53.9 -54.2 -54.0 72 -99 SPO 1997 10 01 12 16 7 4.0 -9 684.50 -53.9 -54.2 -54.0 72 -99 SPO 1997 10 01 12 17 10 3.9 -9 684.50 -53.9 -54.2 -53.9 73 -99 SPO 1997 10 01 12 18 9 4.2 -9 684.60 -53.9 -54.2 -54.0 72 -99 SPO 1997 10 01 12 19 7 4.2 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 20 6 3.6 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 21 5 3.5 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 22 9 3.6 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 23 9 4.0 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 24 9 4.1 -9 684.60 -53.9 -54.4 -54.0 72 -99 SPO 1997 10 01 12 25 8 4.4 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 26 8 4.2 -9 684.60 -54.0 -54.3 -54.0 72 -99 SPO 1997 10 01 12 27 12 4.1 -9 684.60 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 28 10 4.4 -9 684.70 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 29 7 3.9 -9 684.70 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 30 9 3.1 -9 684.70 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 31 8 3.6 -9 684.70 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 32 7 3.7 -9 684.80 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 33 7 3.1 -9 684.80 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 34 7 2.7 -9 684.80 -53.9 -54.3 -54.0 72 -99 SPO 1997 10 01 12 35 10 2.6 -9 684.90 -53.9 -54.3 -53.9 70 -99 SPO 1997 10 01 12 36 4 2.7 -9 684.90 -53.9 -54.3 -54.0 70 -99 SPO 1997 10 01 12 37 3 2.6 -9 684.90 -53.9 -54.4 -54.0 69 -99 SPO 1997 10 01 12 38 4 2.7 -9 685.00 -53.9 -54.4 -54.0 69 -99 SPO 1997 10 01 12 39 4 1.9 -9 685.00 -53.9 -54.3 -53.9 69 -99 SPO 1997 10 01 12 40 4 1.6 -9 685.10 -54.0 -54.3 -53.9 70 -99 SPO 1997 10 01 12 41 4 1.1 -9 685.10 -54.0 -54.3 -53.9 71 -99 SPO 1997 10 01 12 42 4 0.9 -9 685.10 -53.9 -54.3 -53.9 70 -99 SPO 1997 10 01 12 43 4 1.0 -9 685.10 -54.0 -54.3 -53.9 71 -99 SPO 1997 10 01 12 44 4 0.8 -9 685.10 -54.0 -54.3 -53.9 71 -99 SPO 1997 10 01 12 45 4 0.8 -9 685.10 -54.0 -54.3 -53.8 71 -99 SPO 1997 10 01 12 46 4 0.9 -9 685.10 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 12 47 4 0.7 -9 685.10 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 12 48 4 0.4 -9 685.20 -53.9 -54.2 -53.8 70 -99 SPO 1997 10 01 12 49 4 0.3 -9 685.20 -54.0 -54.2 -53.7 71 -99 SPO 1997 10 01 12 50 4 0.0 -9 685.20 -53.9 -54.2 -53.7 70 -99 SPO 1997 10 01 12 51 0 0.0 -9 685.20 -53.9 -54.2 -53.7 70 -99 SPO 1997 10 01 12 52 0 0.0 -9 685.20 -53.9 -54.2 -53.6 72 -99 SPO 1997 10 01 12 53 0 0.0 -9 685.20 -53.9 -54.2 -53.5 73 -99 SPO 1997 10 01 12 54 0 0.0 -9 685.20 -53.9 -54.2 -53.5 73 -99 SPO 1997 10 01 12 55 4 0.0 -9 685.20 -53.9 -54.2 -53.5 73 -99 SPO 1997 10 01 12 56 4 0.6 -9 685.20 -53.9 -54.2 -53.6 73 -99 SPO 1997 10 01 12 57 4 0.7 -9 685.20 -53.9 -54.2 -53.7 73 -99 SPO 1997 10 01 12 58 4 0.8 -9 685.20 -53.9 -54.2 -53.6 73 -99 SPO 1997 10 01 12 59 4 0.8 -9 685.10 -53.9 -54.2 -53.7 73 -99 SPO 1997 10 01 13 00 4 0.9 -9 685.10 -53.9 -54.2 -53.7 73 0 SPO 1997 10 01 13 01 4 1.0 -9 685.10 -53.9 -54.2 -53.7 73 -99 SPO 1997 10 01 13 02 4 1.0 -9 685.20 -53.9 -54.2 -53.7 73 -99 SPO 1997 10 01 13 03 4 1.2 -9 685.10 -53.9 -54.2 -53.8 73 -99 SPO 1997 10 01 13 04 4 1.0 -9 685.10 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 13 05 4 1.3 -9 685.10 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 13 06 4 1.4 -9 685.10 -53.9 -54.3 -53.8 72 -99 SPO 1997 10 01 13 07 4 1.4 -9 685.10 -53.9 -54.3 -53.8 73 -99 SPO 1997 10 01 13 08 4 1.7 -9 685.10 -53.9 -54.3 -53.8 73 -99 SPO 1997 10 01 13 09 4 1.8 -9 685.00 -54.0 -54.3 -53.8 74 -99 SPO 1997 10 01 13 10 4 1.8 -9 685.10 -54.0 -54.3 -53.9 74 -99 SPO 1997 10 01 13 11 4 2.3 -9 685.00 -54.0 -54.3 -53.9 74 -99 SPO 1997 10 01 13 12 4 2.5 -9 685.00 -54.0 -54.3 -53.9 74 -99 SPO 1997 10 01 13 13 4 2.5 -9 685.00 -54.0 -54.3 -53.9 74 -99 SPO 1997 10 01 13 14 4 2.2 -9 685.00 -53.9 -54.3 -53.9 73 -99 SPO 1997 10 01 13 15 4 2.2 -9 685.00 -53.9 -54.3 -53.9 73 -99 SPO 1997 10 01 13 16 4 2.1 -9 685.00 -54.0 -54.3 -53.9 74 -99 SPO 1997 10 01 13 17 4 1.9 -9 685.00 -54.0 -54.3 -53.9 72 -99 SPO 1997 10 01 13 18 4 1.6 -9 685.00 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 13 19 4 1.7 -9 685.00 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 13 20 4 1.5 -9 685.00 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 13 21 4 1.7 -9 685.00 -53.9 -54.3 -53.8 72 -99 SPO 1997 10 01 13 22 4 1.9 -9 685.00 -53.9 -54.3 -53.8 72 -99 SPO 1997 10 01 13 23 4 2.1 -9 685.00 -53.9 -54.3 -53.8 72 -99 SPO 1997 10 01 13 24 4 2.1 -9 685.00 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 25 4 2.5 -9 685.00 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 26 4 2.4 -9 685.00 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 27 4 2.3 -9 685.00 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 28 4 2.5 -9 685.00 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 29 4 2.6 -9 684.90 -53.9 -54.3 -53.9 72 -99 SPO 1997 10 01 13 30 4 2.6 -9 685.00 -53.9 -54.2 -53.9 70 -99 SPO 1997 10 01 13 31 4 2.6 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 32 4 2.8 -9 684.90 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 33 4 2.7 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 34 4 3.3 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 35 4 3.2 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 36 4 3.2 -9 684.90 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 37 4 3.4 -9 684.90 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 38 4 3.2 -9 684.90 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 39 4 3.1 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 40 4 3.1 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 41 4 3.1 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 42 4 3.0 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 43 4 2.9 -9 685.10 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 44 4 2.8 -9 685.00 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 45 4 2.7 -9 685.10 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 46 4 2.9 -9 685.00 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 47 4 2.9 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 48 4 2.7 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 49 4 2.6 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 50 4 2.6 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 51 4 2.7 -9 685.10 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 13 52 4 3.0 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 53 4 3.1 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 54 4 3.3 -9 685.00 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 55 4 3.1 -9 685.00 -53.9 -54.1 -53.9 70 -99 SPO 1997 10 01 13 56 4 3.0 -9 685.00 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 57 4 2.7 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 58 4 2.5 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 13 59 4 2.6 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 14 00 4 2.4 -9 685.10 -53.9 -54.1 -53.9 72 0 SPO 1997 10 01 14 01 4 2.1 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 14 02 4 2.1 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 14 03 4 2.2 -9 685.10 -53.9 -54.1 -53.9 72 -99 SPO 1997 10 01 14 04 4 2.6 -9 685.10 -53.9 -54.1 -53.9 70 -99 SPO 1997 10 01 14 05 4 2.7 -9 685.10 -53.9 -54.1 -53.9 69 -99 SPO 1997 10 01 14 06 4 2.7 -9 685.10 -53.9 -54.1 -53.9 69 -99 SPO 1997 10 01 14 07 4 2.9 -9 685.10 -53.9 -54.1 -53.9 69 -99 SPO 1997 10 01 14 08 4 2.8 -9 685.10 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 09 4 2.8 -9 685.10 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 10 4 2.6 -9 685.20 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 11 4 2.6 -9 685.10 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 12 4 2.8 -9 685.10 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 13 4 2.8 -9 685.10 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 14 4 2.9 -9 685.20 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 15 4 2.5 -9 685.20 -54.0 -54.1 -54.0 70 -99 SPO 1997 10 01 14 16 4 2.3 -9 685.20 -54.0 -54.1 -54.0 70 -99 SPO 1997 10 01 14 17 4 2.2 -9 685.20 -54.0 -54.1 -53.9 70 -99 SPO 1997 10 01 14 18 4 2.2 -9 685.30 -54.0 -54.1 -53.9 70 -99 SPO 1997 10 01 14 19 4 2.2 -9 685.30 -54.0 -54.1 -53.9 70 -99 SPO 1997 10 01 14 20 4 2.3 -9 685.30 -54.0 -54.1 -53.9 70 -99 SPO 1997 10 01 14 21 4 2.2 -9 685.30 -54.0 -54.1 -53.9 70 -99 SPO 1997 10 01 14 22 4 2.2 -9 685.30 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 23 4 2.2 -9 685.30 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 24 4 1.9 -9 685.30 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 25 4 1.9 -9 685.30 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 26 4 1.8 -9 685.30 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 27 4 1.7 -9 685.40 -54.0 -54.2 -53.9 72 -99 SPO 1997 10 01 14 28 4 1.5 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 14 29 4 1.8 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 14 30 4 1.5 -9 685.40 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 31 4 1.3 -9 685.40 -54.0 -54.1 -53.9 71 -99 SPO 1997 10 01 14 32 4 1.4 -9 685.40 -54.0 -54.1 -53.8 71 -99 SPO 1997 10 01 14 33 4 1.4 -9 685.40 -54.0 -54.1 -53.8 72 -99 SPO 1997 10 01 14 34 4 1.5 -9 685.40 -54.0 -54.1 -53.8 72 -99 SPO 1997 10 01 14 35 4 1.5 -9 685.40 -54.0 -54.1 -53.8 72 -99 SPO 1997 10 01 14 36 4 1.6 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 37 4 1.7 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 38 4 1.8 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 39 4 2.0 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 40 4 1.9 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 41 4 1.9 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 42 4 1.8 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 43 4 1.7 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 44 4 1.8 -9 685.40 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 14 45 4 1.9 -9 685.40 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 14 46 4 1.8 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 47 4 1.7 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 48 4 1.9 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 49 4 1.8 -9 685.40 -54.0 -54.2 -53.8 72 -99 SPO 1997 10 01 14 50 4 1.4 -9 685.40 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 14 51 4 1.5 -9 685.40 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 14 52 4 1.6 -9 685.40 -54.0 -54.2 -53.8 71 -99 SPO 1997 10 01 14 53 4 1.6 -9 685.40 -54.0 -54.3 -53.8 71 -99 SPO 1997 10 01 14 54 4 1.5 -9 685.40 -54.0 -54.3 -53.8 70 -99 SPO 1997 10 01 14 55 4 1.7 -9 685.40 -54.0 -54.3 -53.8 70 -99 SPO 1997 10 01 14 56 4 1.8 -9 685.40 -54.0 -54.3 -53.8 70 -99 SPO 1997 10 01 14 57 4 1.6 -9 685.40 -54.0 -54.3 -53.8 70 -99 SPO 1997 10 01 14 58 4 1.5 -9 685.50 -54.0 -54.3 -53.8 72 -99 SPO 1997 10 01 14 59 4 1.8 -9 685.50 -54.0 -54.3 -53.8 72 -99 SPO 1997 10 01 15 00 4 1.8 -9 685.50 -54.0 -54.3 -53.9 72 0 SPO 1997 10 01 15 01 4 2.1 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 02 4 2.3 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 03 4 2.3 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 04 4 2.5 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 05 4 2.7 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 06 4 2.6 -9 685.40 -54.0 -54.2 -53.9 71 -99 SPO 1997 10 01 15 07 4 2.5 -9 685.40 -54.0 -54.2 -53.9 70 -99 SPO 1997 10 01 15 08 4 2.5 -9 685.40 -53.9 -54.3 -53.9 69 -99 SPO 1997 10 01 15 09 4 2.2 -9 685.40 -53.9 -54.3 -53.9 69 -99 SPO 1997 10 01 15 10 4 2.2 -9 685.50 -53.9 -54.3 -53.8 69 -99 SPO 1997 10 01 15 11 4 2.0 -9 685.50 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 15 12 4 2.2 -9 685.50 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 15 13 4 2.2 -9 685.40 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 15 14 4 2.0 -9 685.40 -53.9 -54.3 -53.8 70 -99 SPO 1997 10 01 15 15 4 2.0 -9 685.50 -53.9 -54.3 -53.8 72 -99 SPO 1997 10 01 15 16 4 1.8 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 17 4 1.8 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 18 4 2.1 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 19 4 2.2 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 20 4 2.2 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 21 4 2.0 -9 685.50 -53.9 -54.2 -53.8 70 -99 SPO 1997 10 01 15 22 4 1.8 -9 685.50 -53.9 -54.2 -53.8 70 -99 SPO 1997 10 01 15 23 4 2.2 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 24 4 2.2 -9 685.60 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 25 4 2.2 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 26 4 2.3 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 27 4 2.1 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 28 4 2.2 -9 685.50 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 15 29 4 2.3 -9 685.50 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 15 30 4 2.4 -9 685.50 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 15 31 4 2.4 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 32 4 2.4 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 33 4 2.3 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 34 4 2.4 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 35 4 2.6 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 36 4 2.5 -9 685.40 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 37 4 2.5 -9 685.40 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 15 38 4 2.6 -9 685.40 -53.8 -54.2 -53.8 71 -99 SPO 1997 10 01 15 39 4 2.5 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 40 4 2.4 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 41 4 2.4 -9 685.50 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 42 4 2.3 -9 685.50 -53.9 -54.2 -53.9 72 -99 SPO 1997 10 01 15 43 4 2.4 -9 685.60 -53.9 -54.2 -53.8 72 -99 SPO 1997 10 01 15 44 4 2.3 -9 685.60 -53.9 -54.2 -53.8 70 -99 SPO 1997 10 01 15 45 4 2.2 -9 685.60 -53.9 -54.2 -53.8 69 -99 SPO 1997 10 01 15 46 4 2.4 -9 685.60 -53.8 -54.2 -53.8 68 -99 SPO 1997 10 01 15 47 4 2.5 -9 685.60 -53.8 -54.2 -53.8 68 -99 SPO 1997 10 01 15 48 4 2.3 -9 685.60 -53.8 -54.1 -53.8 68 -99 SPO 1997 10 01 15 49 4 2.3 -9 685.60 -53.8 -54.1 -53.8 69 -99 SPO 1997 10 01 15 50 4 2.0 -9 685.60 -53.8 -54.1 -53.8 69 -99 SPO 1997 10 01 15 51 4 1.6 -9 685.60 -53.8 -54.1 -53.8 69 -99 SPO 1997 10 01 15 52 4 2.1 -9 685.60 -53.8 -54.1 -53.7 69 -99 SPO 1997 10 01 15 53 4 1.9 -9 685.60 -53.8 -54.2 -53.8 69 -99 SPO 1997 10 01 15 54 4 1.9 -9 685.60 -53.8 -54.2 -53.7 71 -99 SPO 1997 10 01 15 55 4 1.9 -9 685.60 -53.8 -54.2 -53.7 71 -99 SPO 1997 10 01 15 56 4 2.1 -9 685.60 -53.8 -54.2 -53.7 71 -99 SPO 1997 10 01 15 57 4 2.0 -9 685.60 -53.8 -54.1 -53.7 69 -99 SPO 1997 10 01 15 58 4 2.4 -9 685.60 -53.7 -54.1 -53.7 68 -99 SPO 1997 10 01 15 59 4 2.3 -9 685.60 -53.7 -54.1 -53.7 68 -99 SPO 1997 10 01 16 00 4 1.8 -9 685.60 -53.7 -54.1 -53.6 68 0 SPO 1997 10 01 16 01 4 1.7 -9 685.60 -53.6 -54.0 -53.6 69 -99 SPO 1997 10 01 16 02 4 1.2 -9 685.70 -53.6 -54.0 -53.6 69 -99 SPO 1997 10 01 16 03 4 1.3 -9 685.70 -53.6 -54.0 -53.5 69 -99 SPO 1997 10 01 16 04 4 1.2 -9 685.70 -53.6 -54.0 -53.5 69 -99 SPO 1997 10 01 16 05 4 1.3 -9 685.70 -53.6 -54.0 -53.5 71 -99 SPO 1997 10 01 16 06 4 1.3 -9 685.70 -53.6 -53.9 -53.5 71 -99 SPO 1997 10 01 16 07 4 1.6 -9 685.70 -53.5 -53.9 -53.5 70 -99 SPO 1997 10 01 16 08 4 1.9 -9 685.60 -53.5 -53.9 -53.5 70 -99 SPO 1997 10 01 16 09 4 2.1 -9 685.60 -53.5 -53.9 -53.5 70 -99 SPO 1997 10 01 16 10 4 2.1 -9 685.60 -53.5 -53.9 -53.4 70 -99 SPO 1997 10 01 16 11 4 2.2 -9 685.60 -53.4 -53.9 -53.4 69 -99 SPO 1997 10 01 16 12 4 2.1 -9 685.60 -53.4 -53.8 -53.4 69 -99 SPO 1997 10 01 16 13 4 2.3 -9 685.60 -53.4 -53.8 -53.4 70 -99 SPO 1997 10 01 16 14 4 2.2 -9 685.60 -53.4 -53.8 -53.4 72 -99 SPO 1997 10 01 16 15 4 2.2 -9 685.60 -53.4 -53.8 -53.4 72 -99 SPO 1997 10 01 16 16 4 2.2 -9 685.60 -53.4 -53.8 -53.3 72 -99 SPO 1997 10 01 16 17 4 2.1 -9 685.60 -53.3 -53.8 -53.3 71 -99 SPO 1997 10 01 16 18 4 2.1 -9 685.60 -53.3 -53.7 -53.3 71 -99 SPO 1997 10 01 16 19 4 1.9 -9 685.60 -53.2 -53.6 -53.2 70 -99 SPO 1997 10 01 16 20 4 1.9 -9 685.60 -53.2 -53.6 -53.2 70 -99 SPO 1997 10 01 16 21 4 2.3 -9 685.60 -53.2 -53.6 -53.2 70 -99 SPO 1997 10 01 16 22 4 2.5 -9 685.60 -53.2 -53.6 -53.2 70 -99 SPO 1997 10 01 16 23 4 2.3 -9 685.60 -53.2 -53.6 -53.2 68 -99 SPO 1997 10 01 16 24 4 2.1 -9 685.60 -53.2 -53.6 -53.1 68 -99 SPO 1997 10 01 16 25 4 2.6 -9 685.60 -53.1 -53.6 -53.1 69 -99 SPO 1997 10 01 16 26 4 3.0 -9 685.50 -53.1 -53.6 -53.1 69 -99 SPO 1997 10 01 16 27 4 2.4 -9 685.60 -53.1 -53.5 -53.1 71 -99 SPO 1997 10 01 16 28 4 2.4 -9 685.60 -53.1 -53.5 -53.1 71 -99 SPO 1997 10 01 16 29 4 2.6 -9 685.60 -53.1 -53.5 -53.1 71 -99 SPO 1997 10 01 16 30 4 2.5 -9 685.60 -53.0 -53.4 -53.1 70 -99 SPO 1997 10 01 16 31 4 2.3 -9 685.60 -53.0 -53.5 -53.1 70 -99 SPO 1997 10 01 16 32 4 2.2 -9 685.60 -53.0 -53.4 -53.0 70 -99 SPO 1997 10 01 16 33 4 1.8 -9 685.70 -53.0 -53.4 -53.0 70 -99 SPO 1997 10 01 16 34 4 1.8 -9 685.70 -53.0 -53.4 -53.0 70 -99 SPO 1997 10 01 16 35 4 1.9 -9 685.70 -53.0 -53.3 -53.0 70 -99 SPO 1997 10 01 16 36 4 2.0 -9 685.70 -53.0 -53.3 -52.9 70 -99 SPO 1997 10 01 16 37 4 1.7 -9 685.70 -52.9 -53.3 -52.9 69 -99 SPO 1997 10 01 16 38 4 2.1 -9 685.60 -52.9 -53.2 -52.9 69 -99 SPO 1997 10 01 16 39 4 1.7 -9 685.70 -52.8 -53.2 -52.8 69 -99 SPO 1997 10 01 16 40 4 1.6 -9 685.70 -52.8 -53.3 -52.8 69 -99 SPO 1997 10 01 16 41 4 1.9 -9 685.70 -52.8 -53.2 -52.8 71 -99 SPO 1997 10 01 16 42 4 2.0 -9 685.60 -52.8 -53.2 -52.8 71 -99 SPO 1997 10 01 16 43 4 1.9 -9 685.60 -52.8 -53.2 -52.8 71 -99 SPO 1997 10 01 16 44 4 1.8 -9 685.60 -52.8 -53.2 -52.7 71 -99 SPO 1997 10 01 16 45 4 1.9 -9 685.60 -52.7 -53.1 -52.7 70 -99 SPO 1997 10 01 16 46 4 1.4 -9 685.70 -52.7 -53.1 -52.7 70 -99 SPO 1997 10 01 16 47 4 1.7 -9 685.70 -52.6 -53.0 -52.6 69 -99 SPO 1997 10 01 16 48 4 1.7 -9 685.70 -52.6 -53.0 -52.6 69 -99 SPO 1997 10 01 16 49 4 1.9 -9 685.70 -52.6 -53.0 -52.5 69 -99 SPO 1997 10 01 16 50 4 1.8 -9 685.70 -52.6 -53.0 -52.6 69 -99 SPO 1997 10 01 16 51 4 1.1 -9 685.80 -52.6 -53.0 -52.5 71 -99 SPO 1997 10 01 16 52 4 1.6 -9 685.70 -52.5 -53.0 -52.5 70 -99 SPO 1997 10 01 16 53 4 1.8 -9 685.70 -52.5 -53.0 -52.5 70 -99 SPO 1997 10 01 16 54 4 1.5 -9 685.80 -52.5 -52.9 -52.4 70 -99 SPO 1997 10 01 16 55 4 1.4 -9 685.80 -52.5 -52.9 -52.4 70 -99 SPO 1997 10 01 16 56 4 1.6 -9 685.80 -52.5 -52.9 -52.4 70 -99 SPO 1997 10 01 16 57 4 1.6 -9 685.80 -52.5 -52.9 -52.4 70 -99 SPO 1997 10 01 16 58 4 1.3 -9 685.80 -52.5 -52.9 -52.5 70 -99 SPO 1997 10 01 16 59 4 1.7 -9 685.80 -52.5 -52.9 -52.4 70 -99 SPO 1997 10 01 17 00 4 1.8 -9 685.80 -52.5 -52.9 -52.4 70 0 SPO 1997 10 01 17 01 4 1.9 -9 685.70 -52.5 -52.8 -52.4 70 -99 SPO 1997 10 01 17 02 4 2.0 -9 685.70 -52.4 -52.8 -52.4 70 -99 SPO 1997 10 01 17 03 4 2.2 -9 685.80 -52.4 -52.8 -52.4 70 -99 SPO 1997 10 01 17 04 4 2.0 -9 685.80 -52.4 -52.8 -52.3 72 -99 SPO 1997 10 01 17 05 4 2.2 -9 685.70 -52.3 -52.8 -52.3 71 -99 SPO 1997 10 01 17 06 4 1.9 -9 685.80 -52.3 -52.8 -52.4 71 -99 SPO 1997 10 01 17 07 4 1.9 -9 685.80 -52.3 -52.8 -52.3 71 -99 SPO 1997 10 01 17 08 4 1.8 -9 685.70 -52.3 -52.8 -52.3 71 -99 SPO 1997 10 01 17 09 4 2.2 -9 685.70 -52.3 -52.7 -52.3 71 -99 SPO 1997 10 01 17 10 4 1.7 -9 685.70 -52.3 -52.7 -52.3 71 -99 SPO 1997 10 01 17 11 4 2.0 -9 685.70 -52.3 -52.8 -52.3 71 -99 SPO 1997 10 01 17 12 4 1.8 -9 685.80 -52.3 -52.8 -52.3 71 -99 SPO 1997 10 01 17 13 4 1.9 -9 685.80 -52.2 -52.7 -52.2 70 -99 SPO 1997 10 01 17 14 4 1.9 -9 685.80 -52.2 -52.7 -52.2 69 -99 SPO 1997 10 01 17 15 4 1.9 -9 685.80 -52.3 -52.7 -52.3 71 -99 SPO 1997 10 01 17 16 4 1.5 -9 685.80 -52.2 -52.7 -52.2 70 -99 SPO 1997 10 01 17 17 4 1.8 -9 685.80 -52.2 -52.7 -52.2 70 -99 SPO 1997 10 01 17 18 4 1.7 -9 685.80 -52.2 -52.7 -52.2 70 -99 SPO 1997 10 01 17 19 4 1.6 -9 685.80 -52.2 -52.6 -52.2 72 -99 SPO 1997 10 01 17 20 4 1.6 -9 685.80 -52.2 -52.6 -52.2 72 -99 SPO 1997 10 01 17 21 4 1.4 -9 685.80 -52.2 -52.6 -52.2 72 -99 SPO 1997 10 01 17 22 4 1.4 -9 685.80 -52.2 -52.5 -52.1 72 -99 SPO 1997 10 01 17 23 4 1.4 -9 685.80 -52.1 -52.5 -52.0 71 -99 SPO 1997 10 01 17 24 4 1.7 -9 685.80 -52.1 -52.5 -52.0 71 -99 SPO 1997 10 01 17 25 4 1.4 -9 685.80 -52.1 -52.5 -52.1 70 -99 SPO 1997 10 01 17 26 4 1.3 -9 685.80 -52.1 -52.5 -52.0 70 -99 SPO 1997 10 01 17 27 4 1.6 -9 685.90 -52.0 -52.5 -51.9 70 -99 SPO 1997 10 01 17 28 4 1.9 -9 685.90 -52.0 -52.5 -52.0 71 -99 SPO 1997 10 01 17 29 4 1.5 -9 685.90 -52.1 -52.5 -52.0 72 -99 SPO 1997 10 01 17 30 4 1.6 -9 685.90 -52.0 -52.4 -52.0 73 -99 SPO 1997 10 01 17 31 4 1.7 -9 685.90 -52.0 -52.4 -51.9 73 -99 SPO 1997 10 01 17 32 4 1.7 -9 685.90 -51.9 -52.4 -51.9 72 -99 SPO 1997 10 01 17 33 4 1.5 -9 685.90 -52.0 -52.4 -51.9 73 -99 SPO 1997 10 01 17 34 4 1.7 -9 685.90 -52.0 -52.4 -51.9 73 -99 SPO 1997 10 01 17 35 4 1.6 -9 685.90 -51.9 -52.4 -51.9 72 -99 SPO 1997 10 01 17 36 4 1.6 -9 686.00 -52.0 -52.4 -51.9 73 -99 SPO 1997 10 01 17 37 4 1.8 -9 685.90 -51.9 -52.3 -51.8 72 -99 SPO 1997 10 01 17 38 4 1.9 -9 686.00 -51.9 -52.3 -51.8 72 -99 SPO 1997 10 01 17 39 4 1.8 -9 686.00 -51.9 -52.3 -51.9 72 -99 SPO 1997 10 01 17 40 4 1.8 -9 686.00 -51.9 -52.3 -51.9 72 -99 SPO 1997 10 01 17 41 4 1.7 -9 686.00 -51.8 -52.3 -51.8 71 -99 SPO 1997 10 01 17 42 4 1.5 -9 686.00 -51.8 -52.3 -51.8 71 -99 SPO 1997 10 01 17 43 4 1.9 -9 685.90 -51.8 -52.2 -51.8 73 -99 SPO 1997 10 01 17 44 4 1.8 -9 686.00 -51.8 -52.3 -51.7 73 -99 SPO 1997 10 01 17 45 4 1.8 -9 686.00 -51.8 -52.2 -51.8 73 -99 SPO 1997 10 01 17 46 4 1.5 -9 686.00 -51.8 -52.2 -51.8 73 -99 SPO 1997 10 01 17 47 4 1.3 -9 686.00 -51.8 -52.2 -51.7 73 -99 SPO 1997 10 01 17 48 4 1.3 -9 686.00 -51.7 -52.2 -51.7 72 -99 SPO 1997 10 01 17 49 4 1.3 -9 686.10 -51.7 -52.2 -51.6 72 -99 SPO 1997 10 01 17 50 4 1.1 -9 686.10 -51.7 -52.1 -51.6 72 -99 SPO 1997 10 01 17 51 4 1.6 -9 686.10 -51.7 -52.1 -51.6 70 -99 SPO 1997 10 01 17 52 4 1.5 -9 686.10 -51.7 -52.1 -51.6 70 -99 SPO 1997 10 01 17 53 4 1.2 -9 686.10 -51.7 -52.1 -51.6 70 -99 SPO 1997 10 01 17 54 4 1.3 -9 686.10 -51.6 -52.1 -51.6 71 -99 SPO 1997 10 01 17 55 4 1.3 -9 686.10 -51.6 -52.0 -51.6 71 -99 SPO 1997 10 01 17 56 4 1.4 -9 686.10 -51.6 -52.0 -51.6 71 -99 SPO 1997 10 01 17 57 4 1.5 -9 686.10 -51.6 -52.1 -51.6 71 -99 SPO 1997 10 01 17 58 4 1.7 -9 686.10 -51.6 -52.1 -51.6 71 -99 SPO 1997 10 01 17 59 4 1.4 -9 686.10 -51.6 -52.0 -51.6 72 -99 SPO 1997 10 01 18 00 4 1.4 -9 686.10 -51.5 -52.0 -51.5 73 0 SPO 1997 10 01 18 01 4 1.5 -9 686.10 -51.5 -52.0 -51.5 73 -99 SPO 1997 10 01 18 02 4 1.6 -9 686.10 -51.6 -52.0 -51.6 72 -99 SPO 1997 10 01 18 03 4 1.7 -9 686.10 -51.6 -52.0 -51.6 72 -99 SPO 1997 10 01 18 04 4 1.6 -9 686.10 -51.5 -52.0 -51.5 71 -99 SPO 1997 10 01 18 05 4 1.9 -9 686.10 -51.5 -51.9 -51.5 71 -99 SPO 1997 10 01 18 06 4 1.9 -9 686.10 -51.5 -51.9 -51.5 71 -99 SPO 1997 10 01 18 07 4 1.8 -9 686.10 -51.5 -51.9 -51.4 71 -99 SPO 1997 10 01 18 08 4 1.8 -9 686.10 -51.4 -51.8 -51.4 72 -99 SPO 1997 10 01 18 09 4 2.0 -9 686.10 -51.4 -51.8 -51.4 72 -99 SPO 1997 10 01 18 10 4 2.0 -9 686.10 -51.4 -51.8 -51.4 72 -99 SPO 1997 10 01 18 11 4 2.2 -9 686.10 -51.3 -51.8 -51.4 71 -99 SPO 1997 10 01 18 12 4 2.0 -9 686.10 -51.3 -51.7 -51.4 71 -99 SPO 1997 10 01 18 13 4 2.0 -9 686.10 -51.3 -51.8 -51.3 71 -99 SPO 1997 10 01 18 14 4 1.8 -9 686.10 -51.3 -51.8 -51.3 71 -99 SPO 1997 10 01 18 15 4 1.9 -9 686.10 -51.3 -51.8 -51.3 71 -99 SPO 1997 10 01 18 16 4 2.1 -9 686.10 -51.3 -51.7 -51.3 71 -99 SPO 1997 10 01 18 17 4 2.0 -9 686.00 -51.2 -51.7 -51.3 71 -99 SPO 1997 10 01 18 18 4 1.9 -9 686.00 -51.2 -51.6 -51.2 71 -99 SPO 1997 10 01 18 19 4 1.9 -9 686.10 -51.2 -51.6 -51.2 72 -99 SPO 1997 10 01 18 20 4 1.8 -9 686.10 -51.2 -51.6 -51.2 72 -99 SPO 1997 10 01 18 21 4 1.8 -9 686.10 -51.2 -51.6 -51.1 72 -99 SPO 1997 10 01 18 22 4 1.6 -9 686.10 -51.1 -51.6 -51.1 72 -99 SPO 1997 10 01 18 23 4 1.7 -9 686.10 -51.1 -51.5 -51.1 72 -99 SPO 1997 10 01 18 24 4 1.5 -9 686.10 -51.1 -51.5 -51.1 72 -99 SPO 1997 10 01 18 25 4 1.8 -9 686.10 -51.1 -51.5 -51.1 74 -99 SPO 1997 10 01 18 26 4 1.9 -9 686.10 -51.1 -51.5 -51.1 72 -99 SPO 1997 10 01 18 27 4 2.0 -9 686.10 -51.1 -51.5 -51.1 72 -99 SPO 1997 10 01 18 28 4 2.1 -9 686.10 -51.1 -51.5 -51.1 71 -99 SPO 1997 10 01 18 29 4 1.8 -9 686.10 -51.0 -51.5 -51.0 71 -99 SPO 1997 10 01 18 30 4 1.9 -9 686.10 -51.0 -51.5 -51.0 71 -99 SPO 1997 10 01 18 31 4 1.5 -9 686.10 -51.0 -51.4 -50.9 71 -99 SPO 1997 10 01 18 32 4 1.6 -9 686.10 -51.0 -51.4 -50.9 71 -99 SPO 1997 10 01 18 33 4 1.7 -9 686.10 -50.9 -51.4 -50.9 71 -99 SPO 1997 10 01 18 34 4 1.9 -9 686.10 -50.9 -51.4 -50.9 71 -99 SPO 1997 10 01 18 35 4 1.9 -9 686.10 -50.9 -51.4 -50.9 72 -99 SPO 1997 10 01 18 36 4 1.9 -9 686.10 -50.8 -51.3 -50.8 71 -99 SPO 1997 10 01 18 37 4 1.9 -9 686.10 -50.9 -51.3 -50.9 72 -99 SPO 1997 10 01 18 38 4 1.7 -9 686.10 -50.9 -51.3 -50.8 72 -99 SPO 1997 10 01 18 39 4 1.8 -9 686.10 -50.8 -51.2 -50.8 71 -99 SPO 1997 10 01 18 40 4 1.7 -9 686.20 -50.8 -51.2 -50.8 71 -99 SPO 1997 10 01 18 41 4 1.6 -9 686.20 -50.8 -51.2 -50.7 71 -99 SPO 1997 10 01 18 42 4 1.6 -9 686.20 -50.8 -51.2 -50.7 71 -99 SPO 1997 10 01 18 43 4 1.7 -9 686.10 -50.7 -51.2 -50.6 71 -99 SPO 1997 10 01 18 44 4 1.8 -9 686.10 -50.8 -51.2 -50.7 71 -99 SPO 1997 10 01 18 45 4 1.7 -9 686.10 -50.7 -51.2 -50.7 71 -99 SPO 1997 10 01 18 46 4 1.6 -9 686.10 -50.7 -51.2 -50.7 71 -99 SPO 1997 10 01 18 47 4 1.7 -9 686.10 -50.7 -51.2 -50.7 71 -99 SPO 1997 10 01 18 48 4 1.5 -9 686.20 -50.7 -51.2 -50.7 72 -99 SPO 1997 10 01 18 49 4 1.3 -9 686.20 -50.7 -51.2 -50.6 72 -99 SPO 1997 10 01 18 50 4 1.4 -9 686.20 -50.7 -51.1 -50.6 72 -99 SPO 1997 10 01 18 51 4 1.3 -9 686.20 -50.7 -51.1 -50.6 72 -99 SPO 1997 10 01 18 52 4 1.4 -9 686.20 -50.7 -51.1 -50.6 72 -99 SPO 1997 10 01 18 53 4 1.4 -9 686.20 -50.6 -51.0 -50.6 72 -99 SPO 1997 10 01 18 54 4 1.3 -9 686.20 -50.6 -51.0 -50.5 72 -99 SPO 1997 10 01 18 55 4 1.2 -9 686.20 -50.6 -51.0 -50.5 72 -99 SPO 1997 10 01 18 56 4 1.3 -9 686.20 -50.6 -51.0 -50.4 72 -99 SPO 1997 10 01 18 57 4 1.4 -9 686.20 -50.6 -50.9 -50.4 72 -99 SPO 1997 10 01 18 58 4 1.7 -9 686.20 -50.6 -50.9 -50.5 72 -99 SPO 1997 10 01 18 59 4 1.6 -9 686.20 -50.5 -50.9 -50.5 72 -99 SPO 1997 10 01 19 00 4 1.4 -9 686.30 -50.5 -50.9 -50.5 72 0 SPO 1997 10 01 19 01 4 1.3 -9 686.30 -50.5 -50.9 -50.4 72 -99 SPO 1997 10 01 19 02 4 1.6 -9 686.30 -50.5 -50.9 -50.4 73 -99 SPO 1997 10 01 19 03 4 1.6 -9 686.30 -50.5 -51.0 -50.4 73 -99 SPO 1997 10 01 19 04 4 1.6 -9 686.30 -50.5 -51.0 -50.5 73 -99 SPO 1997 10 01 19 05 4 1.7 -9 686.30 -50.5 -50.9 -50.4 73 -99 SPO 1997 10 01 19 06 4 1.6 -9 686.30 -50.4 -50.9 -50.4 72 -99 SPO 1997 10 01 19 07 4 1.5 -9 686.30 -50.4 -50.9 -50.4 72 -99 SPO 1997 10 01 19 08 4 1.5 -9 686.30 -50.4 -50.9 -50.4 72 -99 SPO 1997 10 01 19 09 4 1.6 -9 686.30 -50.4 -50.8 -50.4 72 -99 SPO 1997 10 01 19 10 4 1.7 -9 686.30 -50.4 -50.8 -50.4 72 -99 SPO 1997 10 01 19 11 4 1.8 -9 686.30 -50.4 -50.8 -50.4 72 -99 SPO 1997 10 01 19 12 4 2.0 -9 686.30 -50.4 -50.8 -50.3 72 -99 SPO 1997 10 01 19 13 4 2.2 -9 686.30 -50.4 -50.8 -50.4 74 -99 SPO 1997 10 01 19 14 4 2.1 -9 686.30 -50.3 -50.7 -50.3 73 -99 SPO 1997 10 01 19 15 4 2.1 -9 686.30 -50.3 -50.7 -50.3 73 -99 SPO 1997 10 01 19 16 4 1.9 -9 686.30 -50.3 -50.7 -50.3 72 -99 SPO 1997 10 01 19 17 4 1.8 -9 686.30 -50.2 -50.7 -50.2 71 -99 SPO 1997 10 01 19 18 4 1.5 -9 686.40 -50.2 -50.8 -50.2 72 -99 SPO 1997 10 01 19 19 4 1.5 -9 686.40 -50.2 -50.7 -50.2 72 -99 SPO 1997 10 01 19 20 4 1.6 -9 686.40 -50.2 -50.7 -50.2 71 -99 SPO 1997 10 01 19 21 4 1.7 -9 686.40 -50.2 -50.7 -50.2 71 -99 SPO 1997 10 01 19 22 4 1.7 -9 686.40 -50.2 -50.7 -50.2 72 -99 SPO 1997 10 01 19 23 4 1.4 -9 686.40 -50.2 -50.6 -50.1 72 -99 SPO 1997 10 01 19 24 4 1.4 -9 686.40 -50.1 -50.6 -50.1 72 -99 SPO 1997 10 01 19 25 4 1.5 -9 686.50 -50.1 -50.6 -50.1 72 -99 SPO 1997 10 01 19 26 4 1.3 -9 686.50 -50.2 -50.6 -50.1 73 -99 SPO 1997 10 01 19 27 4 1.2 -9 686.50 -50.2 -50.5 -50.0 73 -99 SPO 1997 10 01 19 28 4 1.3 -9 686.50 -50.1 -50.5 -50.0 72 -99 SPO 1997 10 01 19 29 4 1.1 -9 686.50 -50.1 -50.5 -50.0 72 -99 SPO 1997 10 01 19 30 4 1.3 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 31 4 1.4 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 32 4 1.4 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 33 4 1.3 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 34 4 1.6 -9 686.50 -50.1 -50.6 -50.0 74 -99 SPO 1997 10 01 19 35 4 1.6 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 36 4 1.5 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 37 4 1.4 -9 686.50 -50.1 -50.5 -50.0 74 -99 SPO 1997 10 01 19 38 4 1.1 -9 686.50 -50.1 -50.5 -49.9 74 -99 SPO 1997 10 01 19 39 4 1.1 -9 686.50 -50.0 -50.5 -49.9 73 -99 SPO 1997 10 01 19 40 4 1.1 -9 686.60 -50.0 -50.4 -50.0 73 -99 SPO 1997 10 01 19 41 4 1.2 -9 686.60 -50.0 -50.4 -50.0 75 -99 SPO 1997 10 01 19 42 4 1.3 -9 686.60 -50.0 -50.4 -49.9 75 -99 SPO 1997 10 01 19 43 4 1.4 -9 686.50 -50.0 -50.4 -49.9 75 -99 SPO 1997 10 01 19 44 4 1.9 -9 686.50 -50.0 -50.4 -49.9 75 -99 SPO 1997 10 01 19 45 4 2.0 -9 686.50 -50.0 -50.4 -49.9 75 -99 SPO 1997 10 01 19 46 4 1.9 -9 686.50 -50.0 -50.4 -49.9 73 -99 SPO 1997 10 01 19 47 4 2.0 -9 686.50 -50.0 -50.4 -49.9 73 -99 SPO 1997 10 01 19 48 4 2.0 -9 686.50 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 19 49 4 1.6 -9 686.50 -49.9 -50.3 -49.9 71 -99 SPO 1997 10 01 19 50 4 1.5 -9 686.50 -49.9 -50.4 -49.8 73 -99 SPO 1997 10 01 19 51 4 1.3 -9 686.60 -49.9 -50.4 -49.8 73 -99 SPO 1997 10 01 19 52 4 1.0 -9 686.60 -49.8 -50.4 -49.8 73 -99 SPO 1997 10 01 19 53 4 1.2 -9 686.60 -49.9 -50.3 -49.8 74 -99 SPO 1997 10 01 19 54 4 1.4 -9 686.50 -49.9 -50.4 -49.8 74 -99 SPO 1997 10 01 19 55 4 1.2 -9 686.60 -50.0 -50.4 -49.8 75 -99 SPO 1997 10 01 19 56 4 1.2 -9 686.60 -49.9 -50.4 -49.9 74 -99 SPO 1997 10 01 19 57 4 1.0 -9 686.60 -49.9 -50.4 -49.9 74 -99 SPO 1997 10 01 19 58 4 1.2 -9 686.70 -49.9 -50.3 -49.9 74 -99 SPO 1997 10 01 19 59 4 1.0 -9 686.70 -49.9 -50.3 -49.9 74 -99 SPO 1997 10 01 20 00 4 1.3 -9 686.60 -49.9 -50.3 -49.9 74 0 SPO 1997 10 01 20 01 4 1.7 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 02 4 1.7 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 03 4 1.5 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 04 4 1.4 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 05 4 1.8 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 06 4 1.8 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 07 4 2.0 -9 686.50 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 08 4 2.1 -9 686.50 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 09 4 1.9 -9 686.60 -49.9 -50.3 -49.8 73 -99 SPO 1997 10 01 20 10 4 2.0 -9 686.60 -50.0 -50.3 -49.8 73 -99 SPO 1997 10 01 20 11 4 2.1 -9 686.60 -50.0 -50.3 -49.8 73 -99 SPO 1997 10 01 20 12 4 1.9 -9 686.60 -50.0 -50.3 -49.8 73 -99 SPO 1997 10 01 20 13 4 1.8 -9 686.60 -49.9 -50.3 -49.9 71 -99 SPO 1997 10 01 20 14 4 1.9 -9 686.60 -49.9 -50.3 -49.9 71 -99 SPO 1997 10 01 20 15 4 1.8 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 16 4 1.7 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 17 4 1.8 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 18 4 1.7 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 19 4 1.9 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 20 4 1.8 -9 686.70 -50.0 -50.3 -49.9 72 -99 SPO 1997 10 01 20 21 4 1.6 -9 686.80 -50.0 -50.3 -49.9 71 -99 SPO 1997 10 01 20 22 4 1.9 -9 686.80 -50.1 -50.3 -49.9 72 -99 SPO 1997 10 01 20 23 4 2.0 -9 686.70 -50.1 -50.4 -50.0 72 -99 SPO 1997 10 01 20 24 4 1.9 -9 686.70 -50.1 -50.4 -50.0 72 -99 SPO 1997 10 01 20 25 4 1.9 -9 686.70 -50.1 -50.3 -50.0 72 -99 SPO 1997 10 01 20 26 4 1.7 -9 686.80 -50.1 -50.3 -50.0 72 -99 SPO 1997 10 01 20 27 4 1.7 -9 686.80 -50.1 -50.3 -50.0 72 -99 SPO 1997 10 01 20 28 4 1.8 -9 686.80 -50.1 -50.3 -50.0 72 -99 SPO 1997 10 01 20 29 4 2.1 -9 686.70 -50.1 -50.3 -50.0 72 -99 SPO 1997 10 01 20 30 4 2.1 -9 686.80 -50.2 -50.3 -50.1 72 -99 SPO 1997 10 01 20 31 4 2.0 -9 686.80 -50.2 -50.3 -50.1 72 -99 SPO 1997 10 01 20 32 4 2.0 -9 686.80 -50.2 -50.3 -50.1 72 -99 SPO 1997 10 01 20 33 4 1.8 -9 686.80 -50.3 -50.3 -50.1 73 -99 SPO 1997 10 01 20 34 4 1.6 -9 686.80 -50.3 -50.3 -50.1 73 -99 SPO 1997 10 01 20 35 4 1.4 -9 686.90 -50.3 -50.3 -50.1 73 -99 SPO 1997 10 01 20 36 4 1.3 -9 686.90 -50.3 -50.3 -50.1 73 -99 SPO 1997 10 01 20 37 4 1.2 -9 686.90 -50.3 -50.2 -50.1 73 -99 SPO 1997 10 01 20 38 4 1.3 -9 686.90 -50.3 -50.2 -50.2 72 -99 SPO 1997 10 01 20 39 4 1.4 -9 686.90 -50.4 -50.3 -50.2 72 -99 SPO 1997 10 01 20 40 4 1.3 -9 686.90 -50.4 -50.3 -50.2 71 -99 SPO 1997 10 01 20 41 4 1.1 -9 687.00 -50.4 -50.3 -50.2 72 -99 SPO 1997 10 01 20 42 4 1.1 -9 687.00 -50.4 -50.3 -50.3 72 -99 SPO 1997 10 01 20 43 4 1.4 -9 687.00 -50.4 -50.3 -50.3 72 -99 SPO 1997 10 01 20 44 4 1.2 -9 687.00 -50.4 -50.3 -50.3 72 -99 SPO 1997 10 01 20 45 4 0.9 -9 687.10 -50.4 -50.3 -50.3 74 -99 SPO 1997 10 01 20 46 4 0.9 -9 687.10 -50.5 -50.2 -50.3 75 -99 SPO 1997 10 01 20 47 4 0.8 -9 687.20 -50.5 -50.2 -50.3 75 -99 SPO 1997 10 01 20 48 4 0.9 -9 687.20 -50.5 -50.2 -50.3 76 -99 SPO 1997 10 01 20 49 4 0.9 -9 687.20 -50.5 -50.2 -50.3 76 -99 SPO 1997 10 01 20 50 4 1.0 -9 687.20 -50.5 -50.2 -50.2 76 -99 SPO 1997 10 01 20 51 4 1.1 -9 687.10 -50.5 -50.1 -50.2 75 -99 SPO 1997 10 01 20 52 4 1.2 -9 687.10 -50.5 -50.1 -50.2 73 -99 SPO 1997 10 01 20 53 4 1.4 -9 687.10 -50.5 -50.1 -50.2 72 -99 SPO 1997 10 01 20 54 4 1.6 -9 687.10 -50.4 -50.0 -50.2 71 -99 SPO 1997 10 01 20 55 4 1.7 -9 687.10 -50.4 -50.1 -50.2 71 -99 SPO 1997 10 01 20 56 4 1.4 -9 687.10 -50.4 -50.1 -50.2 71 -99 SPO 1997 10 01 20 57 4 1.1 -9 687.10 -50.4 -50.1 -50.2 72 -99 SPO 1997 10 01 20 58 4 1.2 -9 687.10 -50.3 -50.1 -50.1 72 -99 SPO 1997 10 01 20 59 4 1.3 -9 687.10 -50.2 -50.1 -50.1 71 -99 SPO 1997 10 01 21 00 4 1.5 -9 687.00 -50.2 -50.1 -50.0 71 0 SPO 1997 10 01 21 01 4 1.2 -9 687.00 -50.2 -50.1 -50.0 72 -99 SPO 1997 10 01 21 02 4 1.2 -9 687.00 -50.1 -50.0 -50.0 72 -99 SPO 1997 10 01 21 03 4 1.2 -9 687.00 -50.1 -50.0 -50.0 72 -99 SPO 1997 10 01 21 04 4 1.3 -9 687.00 -50.0 -50.0 -49.9 72 -99 SPO 1997 10 01 21 05 4 1.4 -9 687.00 -50.0 -50.0 -49.8 73 -99 SPO 1997 10 01 21 06 4 1.4 -9 687.00 -49.9 -49.9 -49.8 71 -99 SPO 1997 10 01 21 07 4 1.4 -9 686.90 -49.9 -50.0 -49.7 71 -99 SPO 1997 10 01 21 08 4 1.4 -9 687.00 -49.8 -50.0 -49.7 70 -99 SPO 1997 10 01 21 09 4 1.4 -9 686.90 -49.8 -49.9 -49.7 72 -99 SPO 1997 10 01 21 10 4 1.2 -9 687.00 -49.8 -49.9 -49.6 72 -99 SPO 1997 10 01 21 11 4 1.0 -9 687.00 -49.7 -50.0 -49.6 71 -99 SPO 1997 10 01 21 12 4 1.1 -9 687.00 -49.7 -50.0 -49.6 71 -99 SPO 1997 10 01 21 13 4 1.1 -9 687.00 -49.7 -50.0 -49.6 73 -99 SPO 1997 10 01 21 14 4 0.9 -9 687.00 -49.6 -50.0 -49.5 72 -99 SPO 1997 10 01 21 15 4 1.0 -9 687.00 -49.7 -50.0 -49.5 75 -99 SPO 1997 10 01 21 16 4 0.9 -9 687.00 -49.6 -50.0 -49.5 74 -99 SPO 1997 10 01 21 17 4 0.9 -9 687.00 -49.6 -50.0 -49.4 76 -99 SPO 1997 10 01 21 18 4 0.9 -9 687.00 -49.6 -49.9 -49.4 -99 -99 SPO 1997 10 01 21 19 360 1.1 -9 687.00 -49.6 -49.9 -49.4 -99 -99 SPO 1997 10 01 21 20 344 1.9 -9 687.00 -49.6 -49.9 -49.4 -99 -99 SPO 1997 10 01 21 21 340 1.8 -9 687.00 -49.5 -49.9 -49.3 -99 -99 SPO 1997 10 01 21 22 339 1.9 -9 687.00 -49.5 -49.8 -49.3 -99 -99 SPO 1997 10 01 21 23 339 1.8 -9 686.90 -49.5 -49.8 -49.3 -99 -99 SPO 1997 10 01 21 24 338 1.9 -9 687.00 -49.5 -49.8 -49.3 -99 -99 SPO 1997 10 01 21 25 336 1.8 -9 687.00 -49.5 -49.8 -49.2 -99 -99 SPO 1997 10 01 21 26 336 2.1 -9 687.00 -49.5 -49.8 -49.2 -99 -99 SPO 1997 10 01 21 27 334 1.9 -9 687.00 -49.4 -49.8 -49.3 -99 -99 SPO 1997 10 01 21 28 332 1.8 -9 687.00 -49.4 -49.8 -49.2 -99 -99 SPO 1997 10 01 21 29 332 1.7 -9 687.00 -49.4 -49.8 -49.2 77 -99 SPO 1997 10 01 21 30 332 1.9 -9 687.00 -49.4 -49.8 -49.2 77 -99 SPO 1997 10 01 21 31 332 2.0 -9 687.00 -49.5 -49.8 -49.2 78 -99 SPO 1997 10 01 21 32 332 2.0 -9 687.00 -49.5 -49.8 -49.2 75 -99 SPO 1997 10 01 21 33 332 2.0 -9 687.00 -49.5 -49.8 -49.2 75 -99 SPO 1997 10 01 21 34 332 2.1 -9 687.00 -49.5 -49.8 -49.2 73 -99 SPO 1997 10 01 21 35 332 2.0 -9 687.00 -49.5 -49.8 -49.2 73 -99 SPO 1997 10 01 21 36 332 1.8 -9 687.00 -49.5 -49.8 -49.2 73 -99 SPO 1997 10 01 21 37 332 1.9 -9 687.00 -49.4 -49.8 -49.2 73 -99 SPO 1997 10 01 21 38 332 2.0 -9 687.00 -49.4 -49.8 -49.2 74 -99 SPO 1997 10 01 21 39 332 2.1 -9 687.00 -49.4 -49.7 -49.2 74 -99 SPO 1997 10 01 21 40 332 2.2 -9 687.00 -49.4 -49.7 -49.2 74 -99 SPO 1997 10 01 21 41 332 1.9 -9 687.00 -49.4 -49.7 -49.2 74 -99 SPO 1997 10 01 21 42 332 1.9 -9 687.00 -49.4 -49.7 -49.1 73 -99 SPO 1997 10 01 21 43 332 2.0 -9 687.00 -49.4 -49.7 -49.1 73 -99 SPO 1997 10 01 21 44 332 1.9 -9 687.00 -49.5 -49.7 -49.1 71 -99 SPO 1997 10 01 21 45 332 2.0 -9 687.00 -49.5 -49.7 -49.0 71 -99 SPO 1997 10 01 21 46 332 1.8 -9 687.00 -49.5 -49.8 -49.1 71 -99 SPO 1997 10 01 21 47 331 2.0 -9 687.00 -49.5 -49.8 -49.1 71 -99 SPO 1997 10 01 21 48 331 1.9 -9 687.00 -49.6 -49.8 -49.1 72 -99 SPO 1997 10 01 21 49 332 2.0 -9 687.00 -49.6 -49.8 -49.2 72 -99 SPO 1997 10 01 21 50 332 2.0 -9 687.00 -49.6 -49.8 -49.2 72 -99 SPO 1997 10 01 21 51 332 2.0 -9 687.00 -49.7 -49.8 -49.2 73 -99 SPO 1997 10 01 21 52 332 1.9 -9 687.00 -49.8 -49.8 -49.2 73 -99 SPO 1997 10 01 21 53 332 1.7 -9 687.00 -49.8 -49.8 -49.3 72 -99 SPO 1997 10 01 21 54 332 1.9 -9 687.00 -49.8 -49.8 -49.3 72 -99 SPO 1997 10 01 21 55 332 1.9 -9 687.00 -49.8 -49.8 -49.4 72 -99 SPO 1997 10 01 21 56 332 2.0 -9 687.00 -49.9 -49.8 -49.4 71 -99 SPO 1997 10 01 21 57 332 2.1 -9 687.00 -50.0 -49.8 -49.5 71 -99 SPO 1997 10 01 21 58 332 2.0 -9 687.00 -50.0 -49.8 -49.5 69 -99 SPO 1997 10 01 21 59 332 1.9 -9 687.00 -50.1 -49.8 -49.5 70 -99 SPO 1997 10 01 22 00 332 2.0 -9 687.00 -50.1 -49.8 -49.5 68 0 SPO 1997 10 01 22 01 332 2.1 -9 687.00 -50.1 -49.8 -49.5 68 -99 SPO 1997 10 01 22 02 332 2.1 -9 687.00 -50.2 -49.8 -49.6 67 -99 SPO 1997 10 01 22 03 332 2.2 -9 687.00 -50.2 -49.9 -49.6 68 -99 SPO 1997 10 01 22 04 332 2.2 -9 687.00 -50.3 -49.9 -49.7 69 -99 SPO 1997 10 01 22 05 332 2.2 -9 687.00 -50.3 -49.9 -49.7 69 -99 SPO 1997 10 01 22 06 332 2.2 -9 687.00 -50.2 -49.9 -49.8 68 -99 SPO 1997 10 01 22 07 332 2.2 -9 687.00 -50.3 -49.9 -49.8 69 -99 SPO 1997 10 01 22 08 332 2.3 -9 687.00 -50.3 -49.9 -49.8 68 -99 SPO 1997 10 01 22 09 332 2.3 -9 687.00 -50.4 -49.9 -49.9 68 -99 SPO 1997 10 01 22 10 332 2.4 -9 686.90 -50.4 -49.9 -49.9 68 -99 SPO 1997 10 01 22 11 332 2.4 -9 687.00 -50.5 -50.0 -50.0 67 -99 SPO 1997 10 01 22 12 332 2.3 -9 687.00 -50.5 -49.9 -49.9 67 -99 SPO 1997 10 01 22 13 332 2.5 -9 686.90 -50.6 -49.9 -49.9 66 -99 SPO 1997 10 01 22 14 332 2.5 -9 687.00 -50.6 -49.9 -49.8 66 -99 SPO 1997 10 01 22 15 332 2.4 -9 687.00 -50.7 -49.9 -49.7 65 -99 SPO 1997 10 01 22 16 332 2.7 -9 687.00 -50.8 -49.8 -50.0 66 -99 SPO 1997 10 01 22 17 332 2.4 -9 687.00 -50.9 -49.8 -50.0 66 -99 SPO 1997 10 01 22 18 332 2.7 -9 687.00 -51.0 -49.8 -50.1 67 -99 SPO 1997 10 01 22 19 332 2.6 -9 687.00 -51.1 -49.8 -50.1 66 -99 SPO 1997 10 01 22 20 332 2.6 -9 687.00 -51.2 -49.9 -50.2 66 -99 SPO 1997 10 01 22 21 331 2.6 -9 686.90 -51.4 -50.0 -50.5 68 -99 SPO 1997 10 01 22 22 332 2.7 -9 686.90 -51.4 -50.0 -50.7 68 -99 SPO 1997 10 01 22 23 332 2.8 -9 686.90 -51.5 -50.0 -50.9 69 -99 SPO 1997 10 01 22 24 332 2.7 -9 686.90 -51.5 -50.0 -51.0 67 -99 SPO 1997 10 01 22 25 332 2.8 -9 686.90 -51.6 -50.0 -51.0 68 -99 SPO 1997 10 01 22 26 332 2.8 -9 686.90 -51.6 -50.0 -51.1 66 -99 SPO 1997 10 01 22 27 332 2.8 -9 687.00 -51.7 -50.1 -51.2 66 -99 SPO 1997 10 01 22 28 332 2.8 -9 687.00 -51.8 -50.1 -51.4 66 -99 SPO 1997 10 01 22 29 332 2.9 -9 687.00 -51.9 -50.0 -51.6 66 -99 SPO 1997 10 01 22 30 332 2.8 -9 687.00 -51.9 -50.0 -51.5 64 -99 SPO 1997 10 01 22 31 332 2.8 -9 687.00 -52.0 -50.0 -51.6 65 -99 SPO 1997 10 01 22 32 332 2.9 -9 687.00 -52.1 -50.0 -51.7 65 -99 SPO 1997 10 01 22 33 332 3.0 -9 687.00 -52.2 -50.0 -51.7 66 -99 SPO 1997 10 01 22 34 332 2.9 -9 687.00 -52.2 -50.0 -51.7 66 -99 SPO 1997 10 01 22 35 332 3.0 -9 687.00 -52.2 -50.0 -51.8 66 -99 SPO 1997 10 01 22 36 332 3.0 -9 687.00 -52.2 -50.0 -51.8 65 -99 SPO 1997 10 01 22 37 332 3.2 -9 687.00 -52.1 -50.1 -51.7 64 -99 SPO 1997 10 01 22 38 332 3.2 -9 687.00 -52.2 -50.1 -51.9 65 -99 SPO 1997 10 01 22 39 332 3.1 -9 687.00 -52.4 -50.1 -52.2 65 -99 SPO 1997 10 01 22 40 332 3.2 -9 687.00 -52.5 -50.1 -52.3 66 -99 SPO 1997 10 01 22 41 332 3.2 -9 687.00 -52.6 -50.1 -52.2 65 -99 SPO 1997 10 01 22 42 332 3.3 -9 687.00 -52.6 -50.1 -52.2 65 -99 SPO 1997 10 01 22 43 332 3.3 -9 687.00 -52.5 -50.1 -52.1 65 -99 SPO 1997 10 01 22 44 332 3.4 -9 687.00 -52.4 -50.1 -52.1 64 -99 SPO 1997 10 01 22 45 332 3.5 -9 687.00 -52.4 -50.1 -52.2 65 -99 SPO 1997 10 01 22 46 332 3.6 -9 687.00 -52.5 -50.1 -52.3 65 -99 SPO 1997 10 01 22 47 333 3.9 -9 687.00 -52.6 -50.1 -52.4 65 -99 SPO 1997 10 01 22 48 333 4.1 -9 686.90 -52.7 -50.1 -52.5 65 -99 SPO 1997 10 01 22 49 336 4.4 -9 686.80 -52.8 -50.0 -52.6 65 -99 SPO 1997 10 01 22 50 351 4.9 -9 686.80 -52.8 -50.0 -52.6 65 -99 SPO 1997 10 01 22 51 350 5.0 -9 686.80 -52.8 -50.0 -52.6 65 -99 SPO 1997 10 01 22 52 350 5.0 -9 686.80 -52.8 -50.0 -52.6 63 -99 SPO 1997 10 01 22 53 349 5.1 -9 686.80 -52.7 -50.1 -52.6 62 -99 SPO 1997 10 01 22 54 348 5.0 -9 686.80 -52.7 -50.1 -52.5 64 -99 SPO 1997 10 01 22 55 347 4.8 -9 686.90 -52.6 -50.1 -52.5 63 -99 SPO 1997 10 01 22 56 347 4.6 -9 686.90 -52.5 -50.1 -52.4 63 -99 SPO 1997 10 01 22 57 347 4.4 -9 686.90 -52.5 -50.1 -52.4 65 -99 SPO 1997 10 01 22 58 349 4.1 -9 686.90 -52.4 -50.1 -52.4 64 -99 SPO 1997 10 01 22 59 351 3.8 -9 686.90 -52.4 -50.2 -52.3 65 -99 SPO 1997 10 01 23 00 349 3.6 -9 687.00 -52.3 -50.2 -52.2 65 0 SPO 1997 10 01 23 01 350 3.4 -9 687.00 -52.3 -50.1 -52.2 65 -99 SPO 1997 10 01 23 02 349 3.1 -9 687.00 -52.2 -50.1 -52.2 65 -99 SPO 1997 10 01 23 03 348 3.3 -9 687.00 -52.2 -50.2 -52.2 65 -99 SPO 1997 10 01 23 04 347 3.4 -9 687.00 -52.2 -50.2 -52.1 65 -99 SPO 1997 10 01 23 05 346 3.4 -9 687.00 -52.1 -50.1 -52.0 64 -99 SPO 1997 10 01 23 06 346 3.4 -9 687.00 -52.0 -50.1 -52.0 63 -99 SPO 1997 10 01 23 07 346 3.6 -9 687.00 -52.0 -50.1 -52.0 65 -99 SPO 1997 10 01 23 08 346 3.8 -9 687.00 -51.9 -50.2 -51.9 64 -99 SPO 1997 10 01 23 09 346 3.8 -9 687.00 -51.9 -50.2 -51.9 66 -99 SPO 1997 10 01 23 10 347 3.8 -9 687.00 -51.8 -50.2 -51.8 65 -99 SPO 1997 10 01 23 11 348 3.6 -9 687.00 -51.8 -50.2 -51.8 66 -99 SPO 1997 10 01 23 12 349 3.5 -9 687.00 -51.7 -50.2 -51.8 65 -99 SPO 1997 10 01 23 13 350 3.5 -9 687.00 -51.7 -50.2 -51.7 66 -99 SPO 1997 10 01 23 14 350 3.4 -9 687.00 -51.7 -50.2 -51.7 66 -99 SPO 1997 10 01 23 15 350 3.5 -9 687.10 -51.6 -50.2 -51.6 66 -99 SPO 1997 10 01 23 16 352 3.5 -9 687.00 -51.6 -50.3 -51.6 66 -99 SPO 1997 10 01 23 17 352 3.5 -9 687.00 -51.6 -50.2 -51.6 66 -99 SPO 1997 10 01 23 18 350 3.4 -9 687.00 -51.5 -50.2 -51.6 65 -99 SPO 1997 10 01 23 19 350 3.4 -9 687.00 -51.5 -50.3 -51.6 65 -99 SPO 1997 10 01 23 20 349 3.5 -9 687.00 -51.5 -50.3 -51.5 65 -99 SPO 1997 10 01 23 21 350 3.4 -9 687.00 -51.5 -50.3 -51.5 65 -99 SPO 1997 10 01 23 22 350 3.2 -9 687.00 -51.5 -50.3 -51.5 66 -99 SPO 1997 10 01 23 23 350 3.1 -9 687.00 -51.4 -50.3 -51.5 64 -99 SPO 1997 10 01 23 24 351 2.9 -9 687.10 -51.4 -50.3 -51.5 66 -99 SPO 1997 10 01 23 25 350 2.6 -9 687.20 -51.5 -50.4 -51.4 66 -99 SPO 1997 10 01 23 26 354 2.1 -9 687.20 -51.4 -50.5 -51.4 66 -99 SPO 1997 10 01 23 27 357 1.6 -9 687.20 -51.4 -50.6 -51.4 66 -99 SPO 1997 10 01 23 28 359 1.8 -9 687.20 -51.4 -50.6 -51.4 68 -99 SPO 1997 10 01 23 29 354 1.9 -9 687.20 -51.4 -50.7 -51.4 68 -99 SPO 1997 10 01 23 30 356 1.6 -9 687.20 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 31 356 1.5 -9 687.20 -51.4 -50.8 -51.3 66 -99 SPO 1997 10 01 23 32 356 1.3 -9 687.20 -51.4 -50.8 -51.3 66 -99 SPO 1997 10 01 23 33 0 1.0 -9 687.30 -51.4 -51.0 -51.3 66 -99 SPO 1997 10 01 23 34 355 1.0 -9 687.30 -51.4 -51.0 -51.2 66 -99 SPO 1997 10 01 23 35 356 1.4 -9 687.30 -51.4 -51.0 -51.2 66 -99 SPO 1997 10 01 23 36 1 1.7 -9 687.20 -51.4 -51.0 -51.2 68 -99 SPO 1997 10 01 23 37 5 2.0 -9 687.20 -51.3 -50.9 -51.2 67 -99 SPO 1997 10 01 23 38 8 2.0 -9 687.20 -51.3 -50.9 -51.3 67 -99 SPO 1997 10 01 23 39 11 2.0 -9 687.20 -51.3 -51.0 -51.3 67 -99 SPO 1997 10 01 23 40 16 2.1 -9 687.20 -51.4 -50.9 -51.3 68 -99 SPO 1997 10 01 23 41 17 2.4 -9 687.20 -51.4 -51.0 -51.3 68 -99 SPO 1997 10 01 23 42 18 2.6 -9 687.10 -51.4 -51.0 -51.3 68 -99 SPO 1997 10 01 23 43 15 3.0 -9 687.10 -51.4 -50.9 -51.3 66 -99 SPO 1997 10 01 23 44 12 3.4 -9 687.00 -51.4 -50.8 -51.4 66 -99 SPO 1997 10 01 23 45 10 3.4 -9 687.00 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 46 9 3.3 -9 687.00 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 47 8 3.6 -9 687.00 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 48 5 3.9 -9 687.00 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 49 2 4.0 -9 686.90 -51.4 -50.7 -51.4 66 -99 SPO 1997 10 01 23 50 1 3.9 -9 686.90 -51.4 -50.6 -51.4 66 -99 SPO 1997 10 01 23 51 359 3.9 -9 687.00 -51.4 -50.5 -51.4 66 -99 SPO 1997 10 01 23 52 358 3.8 -9 687.00 -51.4 -50.6 -51.4 66 -99 SPO 1997 10 01 23 53 0 3.7 -9 687.00 -51.4 -50.5 -51.4 66 -99 SPO 1997 10 01 23 54 4 3.4 -9 687.00 -51.3 -50.5 -51.3 66 -99 SPO 1997 10 01 23 55 8 3.1 -9 687.00 -51.3 -50.6 -51.3 66 -99 SPO 1997 10 01 23 56 11 3.0 -9 687.00 -51.3 -50.6 -51.3 66 -99 SPO 1997 10 01 23 57 13 2.9 -9 687.10 -51.3 -50.7 -51.3 66 -99 SPO 1997 10 01 23 58 12 3.0 -9 687.10 -51.3 -50.7 -51.2 -99 -99 SPO 1997 10 01 23 59 10 2.9 -9 687.10 -51.3 -50.8 -51.2 -99 -99 SPO 1997 10 02 00 00 8 2.9 -9 687.10 -51.2 -50.8 -51.2 -99 0 SPO 1997 10 02 00 01 5 2.8 -9 687.10 -51.2 -50.8 -51.2 -99 -99 SPO 1997 10 02 00 02 5 2.7 -9 687.10 -51.2 -50.9 -51.2 -99 -99 SPO 1997 10 02 00 03 3 2.9 -9 687.10 -51.2 -50.9 -51.2 66 -99 SPO 1997 10 02 00 04 6 2.8 -9 687.10 -51.2 -50.9 -51.2 66 -99 SPO 1997 10 02 00 05 11 2.5 -9 687.20 -51.2 -50.9 -51.2 66 -99 SPO 1997 10 02 00 06 22 2.0 -9 687.20 -51.2 -50.9 -51.1 66 -99 SPO 1997 10 02 00 07 37 1.3 -9 687.30 -51.2 -51.0 -51.1 66 -99 SPO 1997 10 02 00 08 50 0.3 -9 687.40 -51.2 -51.0 -51.0 66 -99 SPO 1997 10 02 00 09 0 0.0 -9 687.60 -51.1 -51.0 -51.0 65 -99 SPO 1997 10 02 00 10 112 0.1 -9 687.70 -51.0 -51.0 -51.0 64 -99 SPO 1997 10 02 00 11 111 0.2 -9 687.60 -51.1 -51.0 -51.1 64 -99 SPO 1997 10 02 00 12 111 0.0 -9 687.60 -51.1 -51.1 -51.0 65 -99 SPO 1997 10 02 00 13 0 0.0 -9 687.60 -51.2 -51.0 -51.0 66 -99 SPO 1997 10 02 00 14 0 0.0 -9 687.60 -51.1 -51.1 -50.9 66 -99 SPO 1997 10 02 00 15 111 0.1 -9 687.60 -51.1 -51.1 -50.9 67 -99 SPO 1997 10 02 00 16 0 0.0 -9 687.50 -51.1 -51.1 -50.9 67 -99 SPO 1997 10 02 00 17 0 0.0 -9 687.50 -51.1 -51.0 -50.8 67 -99 SPO 1997 10 02 00 18 0 0.0 -9 687.50 -51.1 -51.0 -50.8 68 -99 SPO 1997 10 02 00 19 0 0.0 -9 687.40 -51.1 -51.0 -50.8 68 -99 SPO 1997 10 02 00 20 0 0.0 -9 687.40 -51.2 -51.0 -50.8 69 -99 SPO 1997 10 02 00 21 9 0.6 -9 687.40 -51.2 -51.0 -50.9 68 -99 SPO 1997 10 02 00 22 5 1.4 -9 687.30 -51.2 -51.0 -50.9 67 -99 SPO 1997 10 02 00 23 5 1.9 -9 687.20 -51.2 -51.0 -50.9 66 -99 SPO 1997 10 02 00 24 7 2.4 -9 687.20 -51.1 -50.9 -51.0 66 -99 SPO 1997 10 02 00 25 8 2.1 -9 687.20 -51.1 -50.9 -51.0 67 -99 SPO 1997 10 02 00 26 11 1.8 -9 687.20 -51.1 -50.9 -51.0 67 -99 SPO 1997 10 02 00 27 6 1.2 -9 687.30 -51.2 -50.9 -51.0 67 -99 SPO 1997 10 02 00 28 3 1.2 -9 687.30 -51.3 -51.0 -51.0 68 -99 SPO 1997 10 02 00 29 358 1.3 -9 687.30 -51.2 -50.9 -51.0 67 -99 SPO 1997 10 02 00 30 5 1.3 -9 687.30 -51.2 -51.0 -51.0 68 -99 SPO 1997 10 02 00 31 15 1.2 -9 687.30 -51.2 -51.0 -50.9 68 -99 SPO 1997 10 02 00 32 19 1.2 -9 687.30 -51.2 -51.0 -50.9 68 -99 SPO 1997 10 02 00 33 14 1.2 -9 687.30 -51.1 -50.9 -50.8 67 -99 SPO 1997 10 02 00 34 9 1.1 -9 687.40 -51.1 -50.9 -50.8 67 -99 SPO 1997 10 02 00 35 10 1.1 -9 687.40 -51.0 -50.9 -50.8 67 -99 SPO 1997 10 02 00 36 15 1.1 -9 687.40 -51.0 -50.9 -50.8 67 -99 SPO 1997 10 02 00 37 19 1.0 -9 687.40 -51.0 -50.9 -50.7 67 -99 SPO 1997 10 02 00 38 27 1.0 -9 687.40 -50.9 -50.9 -50.7 67 -99 SPO 1997 10 02 00 39 30 1.3 -9 687.40 -50.9 -50.9 -50.7 67 -99 SPO 1997 10 02 00 40 24 1.4 -9 687.40 -50.8 -50.9 -50.7 67 -99 SPO 1997 10 02 00 41 20 1.3 -9 687.40 -50.8 -50.9 -50.6 67 -99 SPO 1997 10 02 00 42 16 1.1 -9 687.40 -50.8 -50.9 -50.6 67 -99 SPO 1997 10 02 00 43 16 1.0 -9 687.50 -50.7 -50.9 -50.6 67 -99 SPO 1997 10 02 00 44 19 1.2 -9 687.50 -50.7 -50.9 -50.5 67 -99 SPO 1997 10 02 00 45 18 1.0 -9 687.50 -50.6 -50.9 -50.5 67 -99 SPO 1997 10 02 00 46 15 1.3 -9 687.50 -50.6 -50.9 -50.5 67 -99 SPO 1997 10 02 00 47 7 1.4 -9 687.50 -50.6 -50.9 -50.4 68 -99 SPO 1997 10 02 00 48 359 1.6 -9 687.40 -50.5 -50.8 -50.4 67 -99 SPO 1997 10 02 00 49 2 1.5 -9 687.50 -50.5 -50.8 -50.4 67 -99 SPO 1997 10 02 00 50 358 1.4 -9 687.50 -50.4 -50.7 -50.4 67 -99 SPO 1997 10 02 00 51 353 1.2 -9 687.50 -50.4 -50.7 -50.3 67 -99 SPO 1997 10 02 00 52 351 1.2 -9 687.50 -50.4 -50.7 -50.3 67 -99 SPO 1997 10 02 00 53 350 1.6 -9 687.50 -50.3 -50.7 -50.3 67 -99 SPO 1997 10 02 00 54 348 1.9 -9 687.40 -50.3 -50.6 -50.3 68 -99 SPO 1997 10 02 00 55 352 2.1 -9 687.40 -50.3 -50.6 -50.3 68 -99 SPO 1997 10 02 00 56 353 2.1 -9 687.40 -50.3 -50.6 -50.2 68 -99 SPO 1997 10 02 00 57 353 1.9 -9 687.40 -50.2 -50.5 -50.2 67 -99 SPO 1997 10 02 00 58 353 1.9 -9 687.40 -50.2 -50.5 -50.2 68 -99 SPO 1997 10 02 00 59 351 1.8 -9 687.50 -50.2 -50.5 -50.2 68 -99 SPO 1997 10 02 01 00 358 1.4 -9 687.50 -50.2 -50.5 -50.1 67 0 SPO 1997 10 02 01 01 357 1.3 -9 687.50 -50.1 -50.5 -50.1 67 -99 SPO 1997 10 02 01 02 351 1.4 -9 687.60 -50.1 -50.6 -50.1 67 -99 SPO 1997 10 02 01 03 352 1.5 -9 687.50 -50.1 -50.5 -50.1 66 -99 SPO 1997 10 02 01 04 351 1.4 -9 687.50 -50.1 -50.5 -50.1 66 -99 SPO 1997 10 02 01 05 342 1.6 -9 687.60 -50.1 -50.5 -50.0 66 -99 SPO 1997 10 02 01 06 341 1.5 -9 687.60 -50.1 -50.5 -50.0 67 -99 SPO 1997 10 02 01 07 341 1.7 -9 687.60 -50.1 -50.5 -50.0 68 -99 SPO 1997 10 02 01 08 341 1.7 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 09 341 2.0 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 10 341 1.8 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 11 341 2.0 -9 687.60 -50.0 -50.4 -50.0 68 -99 SPO 1997 10 02 01 12 341 2.3 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 13 341 2.3 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 14 347 2.4 -9 687.60 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 15 346 2.4 -9 687.60 -50.0 -50.4 -50.0 66 -99 SPO 1997 10 02 01 16 343 2.4 -9 687.60 -50.0 -50.4 -50.0 65 -99 SPO 1997 10 02 01 17 340 2.3 -9 687.60 -50.0 -50.4 -50.0 65 -99 SPO 1997 10 02 01 18 338 2.2 -9 687.60 -50.0 -50.4 -49.9 65 -99 SPO 1997 10 02 01 19 338 1.9 -9 687.60 -50.0 -50.4 -49.9 66 -99 SPO 1997 10 02 01 20 338 1.9 -9 687.60 -50.0 -50.4 -49.9 67 -99 SPO 1997 10 02 01 21 338 2.0 -9 687.60 -50.1 -50.4 -49.9 67 -99 SPO 1997 10 02 01 22 339 2.2 -9 687.50 -50.1 -50.4 -49.9 67 -99 SPO 1997 10 02 01 23 339 2.0 -9 687.50 -50.0 -50.4 -49.9 66 -99 SPO 1997 10 02 01 24 347 2.2 -9 687.50 -50.0 -50.4 -50.0 66 -99 SPO 1997 10 02 01 25 353 2.1 -9 687.40 -50.0 -50.4 -50.0 66 -99 SPO 1997 10 02 01 26 354 2.1 -9 687.40 -50.1 -50.4 -50.0 68 -99 SPO 1997 10 02 01 27 356 1.9 -9 687.40 -50.1 -50.4 -50.1 68 -99 SPO 1997 10 02 01 28 356 1.9 -9 687.40 -50.1 -50.3 -50.0 67 -99 SPO 1997 10 02 01 29 359 1.7 -9 687.50 -50.1 -50.3 -50.0 67 -99 SPO 1997 10 02 01 30 357 1.7 -9 687.50 -50.1 -50.3 -50.0 66 -99 SPO 1997 10 02 01 31 355 1.8 -9 687.50 -50.1 -50.3 -50.0 66 -99 SPO 1997 10 02 01 32 359 1.8 -9 687.50 -50.1 -50.3 -50.0 65 -99 SPO 1997 10 02 01 33 358 1.8 -9 687.50 -50.1 -50.3 -50.0 64 -99 SPO 1997 10 02 01 34 356 1.8 -9 687.50 -50.1 -50.3 -50.0 65 -99 SPO 1997 10 02 01 35 0 1.6 -9 687.50 -50.1 -50.3 -50.1 65 -99 SPO 1997 10 02 01 36 4 1.6 -9 687.50 -50.1 -50.3 -50.1 66 -99 SPO 1997 10 02 01 37 8 1.6 -9 687.50 -50.1 -50.3 -50.0 66 -99 SPO 1997 10 02 01 38 13 1.5 -9 687.50 -50.1 -50.3 -50.0 66 -99 SPO 1997 10 02 01 39 17 1.7 -9 687.50 -50.1 -50.3 -50.0 67 -99 SPO 1997 10 02 01 40 13 2.0 -9 687.50 -50.1 -50.3 -50.0 67 -99 SPO 1997 10 02 01 41 10 2.0 -9 687.50 -50.1 -50.3 -50.1 66 -99 SPO 1997 10 02 01 42 7 2.2 -9 687.40 -50.2 -50.2 -50.1 67 -99 SPO 1997 10 02 01 43 5 2.4 -9 687.40 -50.2 -50.2 -50.1 67 -99 SPO 1997 10 02 01 44 3 2.4 -9 687.40 -50.2 -50.2 -50.2 66 -99 SPO 1997 10 02 01 45 3 2.4 -9 687.40 -50.2 -50.1 -50.2 65 -99 SPO 1997 10 02 01 46 2 2.5 -9 687.40 -50.3 -50.1 -50.2 66 -99 SPO 1997 10 02 01 47 359 2.6 -9 687.40 -50.3 -50.0 -50.2 66 -99 SPO 1997 10 02 01 48 357 2.6 -9 687.40 -50.3 -50.0 -50.3 66 -99 SPO 1997 10 02 01 49 356 2.7 -9 687.40 -50.4 -50.0 -50.3 66 -99 SPO 1997 10 02 01 50 355 2.6 -9 687.40 -50.4 -50.1 -50.3 66 -99 SPO 1997 10 02 01 51 355 2.5 -9 687.40 -50.5 -50.2 -50.4 67 -99 SPO 1997 10 02 01 52 354 2.7 -9 687.40 -50.5 -50.2 -50.4 67 -99 SPO 1997 10 02 01 53 356 2.8 -9 687.30 -50.6 -50.2 -50.5 67 -99 SPO 1997 10 02 01 54 355 2.9 -9 687.30 -50.6 -50.3 -50.5 67 -99 SPO 1997 10 02 01 55 357 3.0 -9 687.30 -50.6 -50.3 -50.6 67 -99 SPO 1997 10 02 01 56 358 3.0 -9 687.30 -50.7 -50.3 -50.6 66 -99 SPO 1997 10 02 01 57 357 3.1 -9 687.30 -50.7 -50.4 -50.6 66 -99 SPO 1997 10 02 01 58 357 3.1 -9 687.30 -50.7 -50.3 -50.6 65 -99 SPO 1997 10 02 01 59 358 3.0 -9 687.30 -50.7 -50.4 -50.7 64 -99 SPO 1997 10 02 02 00 359 3.3 -9 687.30 -50.8 -50.4 -50.7 65 0 SPO 1997 10 02 02 01 359 3.4 -9 687.30 -50.8 -50.3 -50.8 65 -99 SPO 1997 10 02 02 02 359 3.3 -9 687.30 -50.9 -50.2 -50.8 66 -99 SPO 1997 10 02 02 03 360 3.3 -9 687.30 -50.9 -50.3 -50.8 66 -99 SPO 1997 10 02 02 04 1 3.2 -9 687.30 -51.0 -50.3 -50.8 67 -99 SPO 1997 10 02 02 05 3 3.2 -9 687.30 -51.0 -50.3 -50.8 66 -99 SPO 1997 10 02 02 06 6 3.5 -9 687.30 -51.0 -50.3 -50.9 66 -99 SPO 1997 10 02 02 07 7 3.8 -9 687.30 -51.1 -50.3 -50.9 67 -99 SPO 1997 10 02 02 08 9 3.9 -9 687.30 -51.1 -50.2 -51.0 66 -99 SPO 1997 10 02 02 09 11 4.0 -9 687.30 -51.2 -50.2 -51.1 66 -99 SPO 1997 10 02 02 10 12 4.1 -9 687.30 -51.2 -50.0 -51.1 66 -99 SPO 1997 10 02 02 11 11 4.1 -9 687.30 -51.2 -50.0 -51.1 65 -99 SPO 1997 10 02 02 12 9 4.1 -9 687.30 -51.3 -50.0 -51.2 66 -99 SPO 1997 10 02 02 13 8 4.0 -9 687.40 -51.3 -50.1 -51.2 66 -99 SPO 1997 10 02 02 14 7 4.0 -9 687.30 -51.3 -50.0 -51.3 66 -99 SPO 1997 10 02 02 15 5 3.9 -9 687.40 -51.4 -49.8 -51.3 65 -99 SPO 1997 10 02 02 16 4 3.9 -9 687.40 -51.4 -49.8 -51.3 65 -99 SPO 1997 10 02 02 17 3 3.7 -9 687.40 -51.4 -49.7 -51.3 66 -99 SPO 1997 10 02 02 18 2 3.8 -9 687.40 -51.4 -49.6 -51.3 66 -99 SPO 1997 10 02 02 19 1 4.0 -9 687.40 -51.4 -49.7 -51.3 66 -99 SPO 1997 10 02 02 20 0 4.0 -9 687.40 -51.3 -49.6 -51.2 66 -99 SPO 1997 10 02 02 21 2 4.0 -9 687.40 -51.2 -49.4 -51.2 63 -99 SPO 1997 10 02 02 22 358 3.8 -9 687.40 -51.2 -49.0 -51.1 63 -99 SPO 1997 10 02 02 23 355 3.9 -9 687.40 -51.1 -48.8 -51.1 63 -99 SPO 1997 10 02 02 24 355 3.9 -9 687.40 -51.1 -48.8 -51.0 63 -99 SPO 1997 10 02 02 25 356 4.0 -9 687.30 -51.1 -49.0 -51.0 65 -99 SPO 1997 10 02 02 26 356 4.0 -9 687.30 -51.0 -49.1 -51.0 65 -99 SPO 1997 10 02 02 27 355 3.9 -9 687.30 -51.0 -49.2 -51.0 66 -99 SPO 1997 10 02 02 28 358 4.0 -9 687.30 -51.0 -49.2 -50.9 66 -99 SPO 1997 10 02 02 29 357 4.2 -9 687.30 -50.9 -49.1 -50.9 66 -99 SPO 1997 10 02 02 30 355 4.2 -9 687.30 -50.8 -49.0 -50.8 65 -99 SPO 1997 10 02 02 31 356 4.2 -9 687.30 -50.8 -49.1 -50.8 65 -99 SPO 1997 10 02 02 32 357 4.3 -9 687.30 -50.8 -49.0 -50.8 66 -99 SPO 1997 10 02 02 33 357 4.3 -9 687.30 -50.8 -48.8 -50.8 66 -99 SPO 1997 10 02 02 34 357 4.3 -9 687.30 -50.7 -48.8 -50.7 65 -99 SPO 1997 10 02 02 35 357 4.3 -9 687.30 -50.7 -48.8 -50.7 66 -99 SPO 1997 10 02 02 36 356 4.4 -9 687.30 -50.6 -48.9 -50.7 65 -99 SPO 1997 10 02 02 37 356 4.4 -9 687.30 -50.6 -48.9 -50.6 64 -99 SPO 1997 10 02 02 38 357 4.3 -9 687.30 -50.6 -49.0 -50.6 65 -99 SPO 1997 10 02 02 39 358 4.2 -9 687.30 -50.5 -48.7 -50.6 66 -99 SPO 1997 10 02 02 40 357 4.0 -9 687.30 -50.5 -48.7 -50.6 67 -99 SPO 1997 10 02 02 41 357 4.1 -9 687.30 -50.5 -48.7 -50.5 67 -99 SPO 1997 10 02 02 42 355 4.2 -9 687.40 -50.5 -48.6 -50.5 67 -99 SPO 1997 10 02 02 43 355 4.2 -9 687.30 -50.5 -48.5 -50.5 67 -99 SPO 1997 10 02 02 44 355 4.2 -9 687.30 -50.4 -48.5 -50.5 66 -99 SPO 1997 10 02 02 45 357 4.0 -9 687.40 -50.4 -48.4 -50.5 66 -99 SPO 1997 10 02 02 46 358 3.9 -9 687.40 -50.4 -48.6 -50.4 66 -99 SPO 1997 10 02 02 47 358 4.1 -9 687.40 -50.4 -48.9 -50.4 66 -99 SPO 1997 10 02 02 48 359 4.1 -9 687.40 -50.4 -48.9 -50.4 66 -99 SPO 1997 10 02 02 49 360 4.1 -9 687.40 -50.4 -48.6 -50.4 66 -99 SPO 1997 10 02 02 50 358 4.2 -9 687.40 -50.3 -48.6 -50.3 65 -99 SPO 1997 10 02 02 51 360 3.9 -9 687.40 -50.3 -48.8 -50.3 66 -99 SPO 1997 10 02 02 52 0 4.1 -9 687.40 -50.2 -49.0 -50.3 66 -99 SPO 1997 10 02 02 53 1 4.2 -9 687.30 -50.2 -49.3 -50.3 67 -99 SPO 1997 10 02 02 54 359 4.2 -9 687.30 -50.2 -49.4 -50.2 68 -99 SPO 1997 10 02 02 55 358 4.0 -9 687.30 -50.2 -49.2 -50.2 68 -99 SPO 1997 10 02 02 56 358 4.0 -9 687.30 -50.1 -48.9 -50.2 68 -99 SPO 1997 10 02 02 57 356 4.2 -9 687.30 -50.1 -49.1 -50.2 68 -99 SPO 1997 10 02 02 58 356 4.3 -9 687.30 -50.1 -49.2 -50.2 68 -99 SPO 1997 10 02 02 59 356 4.1 -9 687.30 -50.0 -48.8 -50.1 66 -99 SPO 1997 10 02 03 00 355 4.1 -9 687.30 -50.0 -48.6 -50.1 66 0 SPO 1997 10 02 03 01 354 4.3 -9 687.30 -50.0 -48.8 -50.1 65 -99 SPO 1997 10 02 03 02 354 4.3 -9 687.30 -50.0 -48.9 -50.1 65 -99 SPO 1997 10 02 03 03 353 4.5 -9 687.30 -50.0 -48.6 -50.0 65 -99 SPO 1997 10 02 03 04 353 4.5 -9 687.30 -49.9 -48.5 -50.0 65 -99 SPO 1997 10 02 03 05 352 4.5 -9 687.30 -49.9 -48.6 -50.0 65 -99 SPO 1997 10 02 03 06 352 4.5 -9 687.30 -49.9 -48.4 -49.9 65 -99 SPO 1997 10 02 03 07 351 4.3 -9 687.30 -49.9 -48.5 -49.9 66 -99 SPO 1997 10 02 03 08 353 4.2 -9 687.30 -49.9 -48.5 -49.9 66 -99 SPO 1997 10 02 03 09 351 4.4 -9 687.40 -49.8 -48.2 -49.9 65 -99 SPO 1997 10 02 03 10 350 4.3 -9 687.40 -49.8 -47.9 -49.9 66 -99 SPO 1997 10 02 03 11 348 4.2 -9 687.40 -49.8 -47.6 -49.9 68 -99 SPO 1997 10 02 03 12 347 4.2 -9 687.40 -49.8 -47.6 -49.8 68 -99 SPO 1997 10 02 03 13 345 4.0 -9 687.30 -49.8 -47.6 -49.8 67 -99 SPO 1997 10 02 03 14 347 4.1 -9 687.30 -49.9 -47.9 -49.8 67 -99 SPO 1997 10 02 03 15 347 4.2 -9 687.30 -49.8 -48.0 -49.8 65 -99 SPO 1997 10 02 03 16 344 4.1 -9 687.30 -49.7 -48.1 -49.8 65 -99 SPO 1997 10 02 03 17 343 4.1 -9 687.30 -49.7 -47.9 -49.8 65 -99 SPO 1997 10 02 03 18 344 4.3 -9 687.30 -49.7 -47.9 -49.8 65 -99 SPO 1997 10 02 03 19 344 4.2 -9 687.30 -49.8 -48.0 -49.8 67 -99 SPO 1997 10 02 03 20 342 4.2 -9 687.30 -49.8 -48.1 -49.8 66 -99 SPO 1997 10 02 03 21 341 4.5 -9 687.30 -49.8 -48.0 -49.8 66 -99 SPO 1997 10 02 03 22 346 4.1 -9 687.30 -49.8 -48.0 -49.8 66 -99 SPO 1997 10 02 03 23 347 4.5 -9 687.30 -49.9 -48.3 -49.9 66 -99 SPO 1997 10 02 03 24 346 4.2 -9 687.30 -49.9 -48.4 -50.0 66 -99 SPO 1997 10 02 03 25 347 4.4 -9 687.30 -50.0 -48.4 -50.0 67 -99 SPO 1997 10 02 03 26 346 4.6 -9 687.30 -50.0 -48.6 -50.0 67 -99 SPO 1997 10 02 03 27 346 4.4 -9 687.30 -50.0 -48.8 -50.1 67 -99 SPO 1997 10 02 03 28 346 4.3 -9 687.30 -50.0 -48.9 -50.1 67 -99 SPO 1997 10 02 03 29 346 4.5 -9 687.30 -50.0 -48.9 -50.1 67 -99 SPO 1997 10 02 03 30 346 4.5 -9 687.30 -50.1 -49.0 -50.1 68 -99 SPO 1997 10 02 03 31 345 4.5 -9 687.30 -50.1 -49.0 -50.2 68 -99 SPO 1997 10 02 03 32 344 4.5 -9 687.30 -50.1 -49.0 -50.2 67 -99 SPO 1997 10 02 03 33 344 4.4 -9 687.30 -50.1 -49.2 -50.2 66 -99 SPO 1997 10 02 03 34 343 4.6 -9 687.30 -50.1 -49.0 -50.2 66 -99 SPO 1997 10 02 03 35 343 4.7 -9 687.30 -50.1 -48.6 -50.2 66 -99 SPO 1997 10 02 03 36 343 4.5 -9 687.30 -50.2 -48.6 -50.2 66 -99 SPO 1997 10 02 03 37 342 4.7 -9 687.30 -50.2 -48.6 -50.2 65 -99 SPO 1997 10 02 03 38 341 4.5 -9 687.30 -50.2 -48.4 -50.2 65 -99 SPO 1997 10 02 03 39 340 4.7 -9 687.30 -50.2 -48.4 -50.2 65 -99 SPO 1997 10 02 03 40 340 4.7 -9 687.30 -50.1 -48.6 -50.1 64 -99 SPO 1997 10 02 03 41 339 4.7 -9 687.40 -50.1 -48.6 -50.1 65 -99 SPO 1997 10 02 03 42 339 4.6 -9 687.40 -50.1 -48.3 -50.1 66 -99 SPO 1997 10 02 03 43 340 4.4 -9 687.40 -50.0 -48.5 -50.1 66 -99 SPO 1997 10 02 03 44 339 4.5 -9 687.40 -50.0 -48.7 -50.1 67 -99 SPO 1997 10 02 03 45 339 4.5 -9 687.40 -50.0 -48.7 -50.0 67 -99 SPO 1997 10 02 03 46 340 4.3 -9 687.40 -50.0 -49.0 -50.0 67 -99 SPO 1997 10 02 03 47 341 4.3 -9 687.40 -50.0 -49.2 -50.0 68 -99 SPO 1997 10 02 03 48 341 4.2 -9 687.40 -50.0 -49.2 -50.1 67 -99 SPO 1997 10 02 03 49 341 4.2 -9 687.40 -50.0 -49.3 -50.0 65 -99 SPO 1997 10 02 03 50 341 4.3 -9 687.40 -50.0 -49.1 -50.0 65 -99 SPO 1997 10 02 03 51 341 4.2 -9 687.40 -50.0 -49.1 -50.0 64 -99 SPO 1997 10 02 03 52 343 4.4 -9 687.40 -49.9 -48.2 -49.9 65 -99 SPO 1997 10 02 03 53 340 4.7 -9 687.40 -49.9 -47.1 -50.0 65 -99 SPO 1997 10 02 03 54 335 4.0 -9 687.40 -49.9 -47.8 -49.9 66 -99 SPO 1997 10 02 03 55 330 3.8 -9 687.40 -49.9 -48.6 -49.9 67 -99 SPO 1997 10 02 03 56 334 3.7 -9 687.40 -49.8 -49.2 -49.9 66 -99 SPO 1997 10 02 03 57 339 3.8 -9 687.50 -49.8 -49.2 -49.8 67 -99 SPO 1997 10 02 03 58 336 3.8 -9 687.50 -49.9 -49.0 -49.9 68 -99 SPO 1997 10 02 03 59 337 3.6 -9 687.50 -49.9 -48.4 -49.9 68 -99 SPO 1997 10 02 04 00 336 3.2 -9 687.50 -49.8 -48.0 -49.8 67 0 SPO 1997 10 02 04 01 334 3.5 -9 687.50 -49.9 -47.9 -49.8 68 -99 SPO 1997 10 02 04 02 331 3.7 -9 687.50 -49.8 -48.0 -49.7 66 -99 SPO 1997 10 02 04 03 330 3.7 -9 687.50 -49.7 -48.1 -49.6 65 -99 SPO 1997 10 02 04 04 326 3.9 -9 687.50 -49.6 -48.1 -49.6 65 -99 SPO 1997 10 02 04 05 328 4.0 -9 687.60 -49.4 -47.9 -49.4 65 -99 SPO 1997 10 02 04 06 330 3.9 -9 687.60 -49.3 -47.8 -49.3 66 -99 SPO 1997 10 02 04 07 329 4.0 -9 687.60 -49.4 -47.8 -49.4 69 -99 SPO 1997 10 02 04 08 332 3.8 -9 687.60 -49.4 -48.0 -49.5 69 -99 SPO 1997 10 02 04 09 333 4.0 -9 687.60 -49.5 -48.0 -49.5 68 -99 SPO 1997 10 02 04 10 334 4.0 -9 687.60 -49.6 -48.2 -49.6 68 -99 SPO 1997 10 02 04 11 334 4.1 -9 687.60 -49.6 -48.2 -49.6 68 -99 SPO 1997 10 02 04 12 336 4.2 -9 687.60 -49.6 -48.1 -49.6 68 -99 SPO 1997 10 02 04 13 336 4.2 -9 687.50 -49.6 -48.2 -49.6 66 -99 SPO 1997 10 02 04 14 337 4.2 -9 687.50 -49.6 -48.4 -49.6 66 -99 SPO 1997 10 02 04 15 338 4.3 -9 687.50 -49.6 -48.3 -49.7 65 -99 SPO 1997 10 02 04 16 340 4.4 -9 687.50 -49.7 -48.2 -49.7 65 -99 SPO 1997 10 02 04 17 341 4.6 -9 687.50 -49.8 -48.0 -49.8 66 -99 SPO 1997 10 02 04 18 342 4.5 -9 687.50 -49.8 -48.0 -49.8 66 -99 SPO 1997 10 02 04 19 342 4.6 -9 687.50 -49.9 -48.1 -49.8 67 -99 SPO 1997 10 02 04 20 343 4.6 -9 687.50 -49.8 -48.2 -49.8 66 -99 SPO 1997 10 02 04 21 345 4.6 -9 687.50 -49.8 -48.3 -49.8 66 -99 SPO 1997 10 02 04 22 346 4.2 -9 687.50 -49.8 -48.4 -49.9 66 -99 SPO 1997 10 02 04 23 347 4.5 -9 687.50 -49.9 -48.6 -50.0 67 -99 SPO 1997 10 02 04 24 347 4.6 -9 687.50 -49.9 -48.5 -50.0 67 -99 SPO 1997 10 02 04 25 343 4.6 -9 687.50 -50.0 -48.3 -50.0 67 -99 SPO 1997 10 02 04 26 340 4.6 -9 687.50 -50.0 -47.9 -50.0 66 -99 SPO 1997 10 02 04 27 339 4.7 -9 687.50 -49.8 -47.7 -49.7 65 -99 SPO 1997 10 02 04 28 338 5.0 -9 687.50 -49.7 -47.4 -49.7 65 -99 SPO 1997 10 02 04 29 337 5.0 -9 687.50 -49.8 -47.7 -49.8 65 -99 SPO 1997 10 02 04 30 335 5.0 -9 687.40 -49.7 -48.2 -49.8 65 -99 SPO 1997 10 02 04 31 339 5.0 -9 687.40 -49.8 -48.3 -49.8 67 -99 SPO 1997 10 02 04 32 339 5.0 -9 687.40 -49.7 -48.3 -49.8 67 -99 SPO 1997 10 02 04 33 337 4.8 -9 687.40 -49.7 -48.1 -49.6 68 -99 SPO 1997 10 02 04 34 337 5.4 -9 687.40 -49.6 -48.0 -49.6 68 -99 SPO 1997 10 02 04 35 336 5.5 -9 687.40 -49.5 -47.1 -49.4 67 -99 SPO 1997 10 02 04 36 337 5.3 -9 687.40 -49.5 -47.0 -49.5 68 -99 SPO 1997 10 02 04 37 340 5.2 -9 687.40 -49.5 -47.7 -49.6 68 -99 SPO 1997 10 02 04 38 340 5.0 -9 687.40 -49.6 -48.1 -49.7 67 -99 SPO 1997 10 02 04 39 341 5.1 -9 687.40 -49.7 -48.0 -49.8 67 -99 SPO 1997 10 02 04 40 343 4.9 -9 687.40 -49.7 -48.0 -49.8 65 -99 SPO 1997 10 02 04 41 342 5.1 -9 687.40 -49.7 -47.8 -49.8 65 -99 SPO 1997 10 02 04 42 343 5.4 -9 687.40 -49.6 -47.4 -49.6 65 -99 SPO 1997 10 02 04 43 343 5.2 -9 687.40 -49.5 -48.0 -49.5 65 -99 SPO 1997 10 02 04 44 344 5.0 -9 687.40 -49.5 -48.4 -49.6 66 -99 SPO 1997 10 02 04 45 345 4.3 -9 687.40 -49.6 -48.7 -49.7 67 -99 SPO 1997 10 02 04 46 346 4.3 -9 687.40 -49.6 -48.6 -49.7 67 -99 SPO 1997 10 02 04 47 343 4.5 -9 687.40 -49.6 -48.0 -49.6 67 -99 SPO 1997 10 02 04 48 343 4.8 -9 687.40 -49.6 -47.6 -49.6 67 -99 SPO 1997 10 02 04 49 341 4.9 -9 687.40 -49.6 -48.0 -49.5 68 -99 SPO 1997 10 02 04 50 340 4.8 -9 687.40 -49.4 -48.4 -49.4 66 -99 SPO 1997 10 02 04 51 339 5.0 -9 687.40 -49.4 -48.4 -49.4 66 -99 SPO 1997 10 02 04 52 339 5.0 -9 687.40 -49.4 -48.0 -49.4 66 -99 SPO 1997 10 02 04 53 337 5.2 -9 687.40 -49.4 -47.8 -49.4 66 -99 SPO 1997 10 02 04 54 337 5.1 -9 687.40 -49.3 -47.6 -49.3 66 -99 SPO 1997 10 02 04 55 335 5.2 -9 687.40 -49.2 -47.7 -49.2 66 -99 SPO 1997 10 02 04 56 332 5.2 -9 687.40 -49.0 -47.6 -49.1 65 -99 SPO 1997 10 02 04 57 334 5.4 -9 687.40 -49.0 -47.6 -49.0 66 -99 SPO 1997 10 02 04 58 335 5.1 -9 687.40 -49.0 -47.7 -49.0 67 -99 SPO 1997 10 02 04 59 334 5.3 -9 687.40 -49.0 -47.9 -49.1 67 -99 SPO 1997 10 02 05 00 331 5.6 -9 687.40 -49.0 -47.8 -49.0 67 0 SPO 1997 10 02 05 01 330 6.0 -9 687.30 -48.8 -47.6 -48.8 67 -99 SPO 1997 10 02 05 02 330 5.8 -9 687.30 -48.6 -47.6 -48.6 66 -99 SPO 1997 10 02 05 03 331 5.7 -9 687.40 -48.6 -47.6 -48.6 68 -99 SPO 1997 10 02 05 04 334 5.8 -9 687.40 -48.6 -47.4 -48.6 68 -99 SPO 1997 10 02 05 05 337 5.9 -9 687.40 -48.6 -47.6 -48.7 68 -99 SPO 1997 10 02 05 06 337 6.0 -9 687.40 -48.8 -47.8 -49.0 69 -99 SPO 1997 10 02 05 07 340 5.7 -9 687.40 -49.0 -47.8 -49.1 70 -99 SPO 1997 10 02 05 08 341 5.3 -9 687.40 -49.1 -48.0 -49.2 70 -99 SPO 1997 10 02 05 09 340 5.2 -9 687.40 -49.2 -48.3 -49.3 70 -99 SPO 1997 10 02 05 10 341 5.2 -9 687.40 -49.2 -48.1 -49.2 70 -99 SPO 1997 10 02 05 11 340 5.0 -9 687.40 -49.2 -48.1 -49.2 70 -99 SPO 1997 10 02 05 12 340 5.1 -9 687.40 -49.1 -48.2 -49.2 69 -99 SPO 1997 10 02 05 13 340 5.3 -9 687.50 -49.1 -48.1 -49.2 68 -99 SPO 1997 10 02 05 14 338 5.4 -9 687.50 -49.1 -47.9 -49.2 67 -99 SPO 1997 10 02 05 15 336 5.2 -9 687.50 -49.0 -47.8 -49.0 66 -99 SPO 1997 10 02 05 16 337 5.4 -9 687.50 -48.9 -47.6 -48.8 66 -99 SPO 1997 10 02 05 17 337 5.5 -9 687.50 -48.8 -47.6 -48.8 65 -99 SPO 1997 10 02 05 18 337 5.4 -9 687.50 -48.8 -47.5 -48.9 64 -99 SPO 1997 10 02 05 19 340 5.2 -9 687.50 -48.8 -47.6 -49.0 64 -99 SPO 1997 10 02 05 20 338 5.3 -9 687.50 -49.0 -47.6 -49.1 66 -99 SPO 1997 10 02 05 21 338 5.2 -9 687.50 -49.1 -47.7 -49.1 67 -99 SPO 1997 10 02 05 22 337 5.1 -9 687.50 -49.1 -47.8 -49.1 67 -99 SPO 1997 10 02 05 23 332 5.1 -9 687.50 -49.0 -47.8 -49.0 66 -99 SPO 1997 10 02 05 24 333 5.2 -9 687.50 -48.8 -47.7 -48.8 66 -99 SPO 1997 10 02 05 25 336 5.1 -9 687.50 -48.8 -47.6 -48.8 67 -99 SPO 1997 10 02 05 26 334 5.3 -9 687.50 -48.8 -47.4 -48.9 67 -99 SPO 1997 10 02 05 27 335 5.0 -9 687.50 -48.8 -47.7 -48.9 68 -99 SPO 1997 10 02 05 28 335 5.3 -9 687.50 -48.9 -47.8 -49.0 68 -99 SPO 1997 10 02 05 29 336 5.1 -9 687.40 -48.9 -47.9 -49.0 66 -99 SPO 1997 10 02 05 30 335 5.0 -9 687.50 -48.9 -48.0 -49.0 66 -99 SPO 1997 10 02 05 31 336 4.8 -9 687.50 -48.9 -48.0 -49.0 66 -99 SPO 1997 10 02 05 32 335 4.5 -9 687.40 -48.9 -47.9 -49.0 66 -99 SPO 1997 10 02 05 33 333 4.8 -9 687.40 -48.9 -48.0 -49.0 66 -99 SPO 1997 10 02 05 34 334 4.8 -9 687.50 -48.8 -48.2 -48.9 66 -99 SPO 1997 10 02 05 35 336 4.7 -9 687.50 -48.8 -48.7 -49.0 66 -99 SPO 1997 10 02 05 36 336 4.3 -9 687.50 -49.0 -48.9 -49.0 67 -99 SPO 1997 10 02 05 37 337 4.8 -9 687.50 -49.2 -49.0 -49.2 69 -99 SPO 1997 10 02 05 38 341 4.4 -9 687.50 -49.2 -48.9 -49.3 68 -99 SPO 1997 10 02 05 39 345 4.5 -9 687.50 -49.3 -48.2 -49.3 68 -99 SPO 1997 10 02 05 40 342 4.8 -9 687.50 -49.2 -47.6 -49.2 66 -99 SPO 1997 10 02 05 41 341 5.5 -9 687.50 -49.2 -46.7 -49.2 66 -99 SPO 1997 10 02 05 42 343 5.4 -9 687.50 -49.0 -46.7 -49.0 65 -99 SPO 1997 10 02 05 43 346 5.0 -9 687.50 -48.9 -47.5 -48.8 65 -99 SPO 1997 10 02 05 44 340 4.9 -9 687.50 -48.9 -48.1 -48.9 66 -99 SPO 1997 10 02 05 45 340 4.8 -9 687.60 -48.9 -48.6 -49.0 66 -99 SPO 1997 10 02 05 46 340 4.7 -9 687.60 -48.8 -48.8 -48.9 66 -99 SPO 1997 10 02 05 47 343 4.3 -9 687.60 -48.9 -48.6 -48.9 68 -99 SPO 1997 10 02 05 48 341 4.7 -9 687.60 -48.9 -48.1 -49.0 69 -99 SPO 1997 10 02 05 49 342 4.4 -9 687.60 -48.8 -48.2 -48.9 68 -99 SPO 1997 10 02 05 50 341 4.4 -9 687.60 -48.8 -48.2 -48.9 68 -99 SPO 1997 10 02 05 51 340 4.4 -9 687.60 -48.8 -48.1 -48.8 68 -99 SPO 1997 10 02 05 52 338 4.1 -9 687.60 -48.7 -48.0 -48.8 68 -99 SPO 1997 10 02 05 53 339 4.2 -9 687.70 -48.7 -47.6 -48.7 68 -99 SPO 1997 10 02 05 54 340 4.1 -9 687.70 -48.7 -47.8 -48.7 68 -99 SPO 1997 10 02 05 55 338 4.1 -9 687.70 -48.6 -48.2 -48.6 67 -99 SPO 1997 10 02 05 56 339 4.0 -9 687.70 -48.6 -48.6 -48.6 67 -99 SPO 1997 10 02 05 57 339 3.6 -9 687.70 -48.6 -48.8 -48.7 67 -99 SPO 1997 10 02 05 58 336 3.5 -9 687.70 -48.6 -48.8 -48.7 68 -99 SPO 1997 10 02 05 59 339 3.5 -9 687.70 -48.6 -48.8 -48.6 68 -99 SPO 1997 10 02 06 00 341 3.6 -9 687.70 -48.6 -48.5 -48.6 68 0 SPO 1997 10 02 06 01 341 3.6 -9 687.80 -48.6 -48.6 -48.6 68 -99 SPO 1997 10 02 06 02 342 3.7 -9 687.80 -48.5 -48.7 -48.5 68 -99 SPO 1997 10 02 06 03 346 3.6 -9 687.70 -48.5 -48.8 -48.5 69 -99 SPO 1997 10 02 06 04 347 3.7 -9 687.70 -48.5 -48.8 -48.6 69 -99 SPO 1997 10 02 06 05 346 3.8 -9 687.70 -48.5 -48.8 -48.6 67 -99 SPO 1997 10 02 06 06 348 3.4 -9 687.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 10 02 06 07 345 3.5 -9 687.80 -48.4 -48.7 -48.5 66 -99 SPO 1997 10 02 06 08 348 3.2 -9 687.80 -48.5 -48.7 -48.5 66 -99 SPO 1997 10 02 06 09 343 3.4 -9 687.80 -48.5 -48.7 -48.5 66 -99 SPO 1997 10 02 06 10 343 3.2 -9 687.80 -48.4 -48.6 -48.5 66 -99 SPO 1997 10 02 06 11 344 3.2 -9 687.80 -48.4 -48.4 -48.4 67 -99 SPO 1997 10 02 06 12 343 3.6 -9 687.80 -48.4 -48.2 -48.4 68 -99 SPO 1997 10 02 06 13 341 3.5 -9 687.70 -48.4 -48.1 -48.4 69 -99 SPO 1997 10 02 06 14 336 3.7 -9 687.80 -48.3 -48.2 -48.3 69 -99 SPO 1997 10 02 06 15 336 3.5 -9 687.80 -48.2 -48.2 -48.3 69 -99 SPO 1997 10 02 06 16 336 3.7 -9 687.80 -48.2 -48.2 -48.2 69 -99 SPO 1997 10 02 06 17 335 3.9 -9 687.80 -48.2 -48.2 -48.2 69 -99 SPO 1997 10 02 06 18 336 3.9 -9 687.80 -48.2 -48.3 -48.2 69 -99 SPO 1997 10 02 06 19 335 3.9 -9 687.70 -48.2 -48.3 -48.2 68 -99 SPO 1997 10 02 06 20 336 3.9 -9 687.70 -48.2 -48.3 -48.2 68 -99 SPO 1997 10 02 06 21 336 4.1 -9 687.70 -48.1 -48.2 -48.2 66 -99 SPO 1997 10 02 06 22 335 4.2 -9 687.70 -48.1 -48.1 -48.2 66 -99 SPO 1997 10 02 06 23 335 4.1 -9 687.70 -48.0 -48.2 -48.1 67 -99 SPO 1997 10 02 06 24 336 4.1 -9 687.70 -48.1 -48.2 -48.1 68 -99 SPO 1997 10 02 06 25 335 4.6 -9 687.70 -48.1 -48.1 -48.1 68 -99 SPO 1997 10 02 06 26 336 4.4 -9 687.70 -48.0 -48.0 -48.1 68 -99 SPO 1997 10 02 06 27 336 4.5 -9 687.60 -48.0 -48.1 -48.1 68 -99 SPO 1997 10 02 06 28 338 4.6 -9 687.60 -48.1 -48.0 -48.1 69 -99 SPO 1997 10 02 06 29 338 4.6 -9 687.60 -48.1 -48.1 -48.0 69 -99 SPO 1997 10 02 06 30 337 4.7 -9 687.60 -48.1 -48.2 -48.2 69 -99 SPO 1997 10 02 06 31 336 4.7 -9 687.60 -48.1 -48.3 -48.1 68 -99 SPO 1997 10 02 06 32 335 4.6 -9 687.60 -48.1 -48.2 -48.1 67 -99 SPO 1997 10 02 06 33 334 4.8 -9 687.60 -48.0 -48.0 -48.1 67 -99 SPO 1997 10 02 06 34 336 4.6 -9 687.60 -48.0 -47.8 -48.0 67 -99 SPO 1997 10 02 06 35 335 4.7 -9 687.60 -48.0 -47.8 -48.0 67 -99 SPO 1997 10 02 06 36 335 4.8 -9 687.60 -48.0 -48.0 -48.0 67 -99 SPO 1997 10 02 06 37 334 4.6 -9 687.60 -47.9 -48.0 -48.0 67 -99 SPO 1997 10 02 06 38 335 4.5 -9 687.60 -47.8 -47.9 -47.9 67 -99 SPO 1997 10 02 06 39 335 4.6 -9 687.50 -47.8 -47.9 -47.9 67 -99 SPO 1997 10 02 06 40 335 4.8 -9 687.50 -47.9 -48.0 -47.9 67 -99 SPO 1997 10 02 06 41 335 5.0 -9 687.50 -47.9 -48.0 -47.9 67 -99 SPO 1997 10 02 06 42 336 4.7 -9 687.50 -47.9 -48.0 -47.9 67 -99 SPO 1997 10 02 06 43 336 4.6 -9 687.50 -47.9 -48.1 -47.9 67 -99 SPO 1997 10 02 06 44 335 4.7 -9 687.50 -47.9 -48.2 -48.0 67 -99 SPO 1997 10 02 06 45 336 4.7 -9 687.50 -47.9 -48.2 -48.0 67 -99 SPO 1997 10 02 06 46 335 4.6 -9 687.50 -48.0 -48.1 -48.0 67 -99 SPO 1997 10 02 06 47 335 4.7 -9 687.50 -48.0 -48.0 -48.0 67 -99 SPO 1997 10 02 06 48 337 4.5 -9 687.50 -48.0 -48.0 -48.0 67 -99 SPO 1997 10 02 06 49 336 4.8 -9 687.50 -48.0 -47.8 -48.0 68 -99 SPO 1997 10 02 06 50 336 4.8 -9 687.50 -48.0 -47.8 -48.0 69 -99 SPO 1997 10 02 06 51 336 5.1 -9 687.50 -48.0 -47.8 -48.0 69 -99 SPO 1997 10 02 06 52 336 4.8 -9 687.50 -47.9 -47.7 -47.9 68 -99 SPO 1997 10 02 06 53 337 5.0 -9 687.50 -47.9 -47.6 -47.9 68 -99 SPO 1997 10 02 06 54 337 4.9 -9 687.50 -47.9 -47.6 -47.9 69 -99 SPO 1997 10 02 06 55 338 4.5 -9 687.50 -47.8 -47.9 -47.9 68 -99 SPO 1997 10 02 06 56 339 4.5 -9 687.60 -47.8 -47.8 -47.9 67 -99 SPO 1997 10 02 06 57 340 4.4 -9 687.60 -47.9 -47.7 -47.9 68 -99 SPO 1997 10 02 06 58 340 4.3 -9 687.60 -47.8 -47.6 -47.9 67 -99 SPO 1997 10 02 06 59 340 4.3 -9 687.60 -47.8 -47.8 -47.9 67 -99 SPO 1997 10 02 07 00 340 4.3 -9 687.60 -47.8 -47.8 -47.9 67 0 SPO 1997 10 02 07 01 342 4.3 -9 687.60 -47.8 -47.8 -47.9 67 -99 SPO 1997 10 02 07 02 342 4.4 -9 687.60 -47.8 -47.7 -47.9 68 -99 SPO 1997 10 02 07 03 341 4.4 -9 687.60 -47.9 -47.5 -47.9 68 -99 SPO 1997 10 02 07 04 340 4.3 -9 687.60 -47.9 -47.2 -47.9 68 -99 SPO 1997 10 02 07 05 339 4.5 -9 687.60 -47.8 -47.1 -47.9 67 -99 SPO 1997 10 02 07 06 337 4.4 -9 687.60 -47.8 -47.0 -47.8 68 -99 SPO 1997 10 02 07 07 337 4.3 -9 687.60 -47.7 -47.1 -47.7 67 -99 SPO 1997 10 02 07 08 336 4.5 -9 687.60 -47.6 -47.2 -47.7 67 -99 SPO 1997 10 02 07 09 337 4.3 -9 687.60 -47.6 -47.0 -47.6 67 -99 SPO 1997 10 02 07 10 336 4.4 -9 687.60 -47.6 -47.0 -47.6 68 -99 SPO 1997 10 02 07 11 339 4.2 -9 687.60 -47.5 -47.0 -47.5 67 -99 SPO 1997 10 02 07 12 340 4.1 -9 687.70 -47.5 -47.0 -47.5 67 -99 SPO 1997 10 02 07 13 340 4.1 -9 687.70 -47.5 -47.3 -47.5 67 -99 SPO 1997 10 02 07 14 342 4.0 -9 687.70 -47.5 -47.4 -47.5 69 -99 SPO 1997 10 02 07 15 343 4.1 -9 687.70 -47.5 -47.5 -47.5 69 -99 SPO 1997 10 02 07 16 342 4.1 -9 687.60 -47.5 -47.4 -47.5 69 -99 SPO 1997 10 02 07 17 343 4.1 -9 687.70 -47.5 -47.4 -47.5 69 -99 SPO 1997 10 02 07 18 341 4.2 -9 687.70 -47.5 -47.4 -47.5 69 -99 SPO 1997 10 02 07 19 341 4.0 -9 687.60 -47.5 -47.1 -47.5 69 -99 SPO 1997 10 02 07 20 341 4.3 -9 687.60 -47.5 -47.0 -47.6 69 -99 SPO 1997 10 02 07 21 337 4.2 -9 687.60 -47.5 -47.2 -47.6 68 -99 SPO 1997 10 02 07 22 337 4.2 -9 687.60 -47.5 -47.2 -47.6 67 -99 SPO 1997 10 02 07 23 337 4.4 -9 687.60 -47.5 -47.2 -47.5 67 -99 SPO 1997 10 02 07 24 337 4.7 -9 687.60 -47.5 -47.0 -47.5 67 -99 SPO 1997 10 02 07 25 337 4.4 -9 687.60 -47.4 -46.9 -47.4 66 -99 SPO 1997 10 02 07 26 336 4.3 -9 687.60 -47.4 -46.8 -47.4 67 -99 SPO 1997 10 02 07 27 335 4.3 -9 687.60 -47.4 -47.0 -47.4 67 -99 SPO 1997 10 02 07 28 335 4.2 -9 687.60 -47.4 -47.2 -47.4 67 -99 SPO 1997 10 02 07 29 335 4.1 -9 687.60 -47.4 -47.3 -47.4 68 -99 SPO 1997 10 02 07 30 335 4.1 -9 687.70 -47.4 -47.4 -47.4 68 -99 SPO 1997 10 02 07 31 336 4.1 -9 687.70 -47.4 -47.4 -47.4 68 -99 SPO 1997 10 02 07 32 337 4.0 -9 687.70 -47.4 -47.1 -47.4 68 -99 SPO 1997 10 02 07 33 337 3.7 -9 687.70 -47.4 -47.2 -47.4 68 -99 SPO 1997 10 02 07 34 337 4.0 -9 687.70 -47.3 -47.1 -47.4 67 -99 SPO 1997 10 02 07 35 338 4.1 -9 687.70 -47.3 -47.2 -47.4 67 -99 SPO 1997 10 02 07 36 339 4.0 -9 687.70 -47.3 -47.3 -47.3 67 -99 SPO 1997 10 02 07 37 339 4.1 -9 687.70 -47.3 -47.3 -47.3 67 -99 SPO 1997 10 02 07 38 342 3.8 -9 687.80 -47.2 -47.2 -47.3 67 -99 SPO 1997 10 02 07 39 342 3.9 -9 687.80 -47.2 -47.2 -47.3 67 -99 SPO 1997 10 02 07 40 342 3.7 -9 687.80 -47.2 -47.4 -47.3 67 -99 SPO 1997 10 02 07 41 344 4.0 -9 687.80 -47.2 -47.3 -47.3 67 -99 SPO 1997 10 02 07 42 343 4.0 -9 687.80 -47.2 -47.3 -47.2 67 -99 SPO 1997 10 02 07 43 342 3.8 -9 687.80 -47.1 -47.2 -47.2 66 -99 SPO 1997 10 02 07 44 341 3.8 -9 687.80 -47.1 -47.2 -47.1 67 -99 SPO 1997 10 02 07 45 340 3.9 -9 687.80 -47.0 -47.0 -47.1 66 -99 SPO 1997 10 02 07 46 338 4.0 -9 687.80 -47.0 -46.9 -47.0 66 -99 SPO 1997 10 02 07 47 338 4.1 -9 687.80 -47.0 -46.8 -47.0 66 -99 SPO 1997 10 02 07 48 337 4.2 -9 687.80 -47.0 -46.8 -47.0 67 -99 SPO 1997 10 02 07 49 336 4.0 -9 687.80 -47.0 -46.9 -47.0 67 -99 SPO 1997 10 02 07 50 337 4.3 -9 687.70 -47.0 -46.9 -47.0 67 -99 SPO 1997 10 02 07 51 335 4.0 -9 687.70 -46.9 -46.8 -46.9 66 -99 SPO 1997 10 02 07 52 338 4.0 -9 687.70 -46.9 -46.9 -46.9 68 -99 SPO 1997 10 02 07 53 339 4.3 -9 687.70 -46.9 -46.9 -47.0 68 -99 SPO 1997 10 02 07 54 341 4.3 -9 687.70 -47.0 -47.0 -47.0 68 -99 SPO 1997 10 02 07 55 340 4.4 -9 687.70 -47.0 -47.0 -47.0 68 -99 SPO 1997 10 02 07 56 340 4.3 -9 687.70 -47.0 -46.9 -47.0 68 -99 SPO 1997 10 02 07 57 338 4.6 -9 687.60 -46.9 -46.7 -47.0 68 -99 SPO 1997 10 02 07 58 337 4.3 -9 687.60 -46.8 -46.5 -46.9 68 -99 SPO 1997 10 02 07 59 336 4.4 -9 687.60 -46.9 -46.4 -46.9 69 -99 SPO 1997 10 02 08 00 335 4.4 -9 687.60 -46.9 -46.4 -46.9 68 0 SPO 1997 10 02 08 01 331 4.3 -9 687.70 -46.8 -46.7 -46.9 68 -99 SPO 1997 10 02 08 02 332 4.3 -9 687.70 -46.8 -46.7 -46.8 68 -99 SPO 1997 10 02 08 03 329 4.3 -9 687.70 -46.7 -46.5 -46.7 67 -99 SPO 1997 10 02 08 04 328 4.4 -9 687.70 -46.6 -46.3 -46.6 67 -99 SPO 1997 10 02 08 05 328 4.3 -9 687.70 -46.6 -46.3 -46.6 69 -99 SPO 1997 10 02 08 06 331 4.3 -9 687.70 -46.5 -46.4 -46.6 68 -99 SPO 1997 10 02 08 07 331 4.1 -9 687.70 -46.5 -46.4 -46.6 69 -99 SPO 1997 10 02 08 08 331 4.0 -9 687.70 -46.4 -46.4 -46.5 69 -99 SPO 1997 10 02 08 09 329 3.8 -9 687.80 -46.4 -46.4 -46.4 70 -99 SPO 1997 10 02 08 10 328 3.7 -9 687.80 -46.4 -46.3 -46.4 70 -99 SPO 1997 10 02 08 11 326 3.6 -9 687.80 -46.3 -46.3 -46.3 70 -99 SPO 1997 10 02 08 12 326 3.7 -9 687.80 -46.2 -46.2 -46.3 70 -99 SPO 1997 10 02 08 13 326 3.8 -9 687.80 -46.2 -46.1 -46.2 70 -99 SPO 1997 10 02 08 14 326 3.9 -9 687.80 -46.1 -46.0 -46.1 69 -99 SPO 1997 10 02 08 15 325 3.9 -9 687.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 10 02 08 16 326 3.8 -9 687.80 -45.9 -45.8 -46.0 69 -99 SPO 1997 10 02 08 17 326 3.9 -9 687.80 -45.8 -45.7 -45.9 68 -99 SPO 1997 10 02 08 18 325 3.9 -9 687.80 -45.8 -45.5 -45.8 69 -99 SPO 1997 10 02 08 19 325 3.9 -9 687.80 -45.7 -45.4 -45.8 69 -99 SPO 1997 10 02 08 20 323 3.9 -9 687.80 -45.6 -45.4 -45.7 68 -99 SPO 1997 10 02 08 21 320 3.8 -9 687.80 -45.6 -45.3 -45.6 69 -99 SPO 1997 10 02 08 22 319 3.8 -9 687.80 -45.5 -45.3 -45.6 69 -99 SPO 1997 10 02 08 23 318 4.1 -9 687.80 -45.4 -45.3 -45.5 69 -99 SPO 1997 10 02 08 24 317 4.3 -9 687.80 -45.3 -45.3 -45.3 70 -99 SPO 1997 10 02 08 25 319 4.4 -9 687.70 -45.1 -45.3 -45.2 70 -99 SPO 1997 10 02 08 26 321 4.5 -9 687.70 -45.1 -45.3 -45.2 71 -99 SPO 1997 10 02 08 27 322 4.7 -9 687.70 -45.1 -45.3 -45.2 71 -99 SPO 1997 10 02 08 28 324 4.3 -9 687.70 -45.1 -45.2 -45.2 70 -99 SPO 1997 10 02 08 29 321 4.6 -9 687.70 -45.1 -45.1 -45.2 70 -99 SPO 1997 10 02 08 30 319 4.7 -9 687.70 -45.1 -45.2 -45.2 70 -99 SPO 1997 10 02 08 31 318 4.6 -9 687.70 -45.0 -45.2 -45.1 70 -99 SPO 1997 10 02 08 32 317 5.0 -9 687.70 -45.0 -45.1 -45.0 70 -99 SPO 1997 10 02 08 33 316 5.1 -9 687.70 -44.9 -45.0 -45.0 70 -99 SPO 1997 10 02 08 34 315 5.0 -9 687.70 -44.9 -45.0 -44.9 70 -99 SPO 1997 10 02 08 35 313 4.9 -9 687.70 -44.8 -45.0 -44.9 70 -99 SPO 1997 10 02 08 36 310 4.8 -9 687.60 -44.8 -45.0 -44.9 70 -99 SPO 1997 10 02 08 37 311 4.6 -9 687.60 -44.8 -45.0 -44.8 70 -99 SPO 1997 10 02 08 38 312 4.8 -9 687.60 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 39 312 4.9 -9 687.60 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 40 312 5.3 -9 687.60 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 41 310 5.1 -9 687.60 -44.7 -45.0 -44.8 69 -99 SPO 1997 10 02 08 42 310 4.7 -9 687.60 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 43 310 4.6 -9 687.60 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 44 308 4.7 -9 687.70 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 45 308 4.5 -9 687.70 -44.7 -45.0 -44.8 70 -99 SPO 1997 10 02 08 46 310 4.8 -9 687.70 -44.7 -45.0 -44.8 72 -99 SPO 1997 10 02 08 47 309 4.7 -9 687.70 -44.7 -45.0 -44.8 72 -99 SPO 1997 10 02 08 48 309 4.4 -9 687.70 -44.7 -45.0 -44.8 72 -99 SPO 1997 10 02 08 49 309 4.5 -9 687.70 -44.7 -45.0 -44.8 72 -99 SPO 1997 10 02 08 50 310 4.7 -9 687.70 -44.6 -44.9 -44.8 71 -99 SPO 1997 10 02 08 51 308 4.6 -9 687.70 -44.6 -44.9 -44.7 71 -99 SPO 1997 10 02 08 52 306 4.7 -9 687.70 -44.6 -44.8 -44.7 71 -99 SPO 1997 10 02 08 53 306 4.4 -9 687.70 -44.6 -44.8 -44.6 70 -99 SPO 1997 10 02 08 54 304 4.2 -9 687.70 -44.6 -44.8 -44.6 70 -99 SPO 1997 10 02 08 55 302 4.6 -9 687.80 -44.5 -44.7 -44.6 68 -99 SPO 1997 10 02 08 56 299 4.4 -9 687.70 -44.5 -44.6 -44.6 69 -99 SPO 1997 10 02 08 57 302 4.4 -9 687.70 -44.4 -44.5 -44.5 70 -99 SPO 1997 10 02 08 58 306 4.6 -9 687.70 -44.4 -44.5 -44.4 71 -99 SPO 1997 10 02 08 59 306 4.3 -9 687.70 -44.4 -44.3 -44.4 72 -99 SPO 1997 10 02 09 00 308 4.5 -9 687.70 -44.4 -44.0 -44.5 72 0 SPO 1997 10 02 09 01 310 4.6 -9 687.70 -44.3 -44.0 -44.4 72 -99 SPO 1997 10 02 09 02 312 4.8 -9 687.60 -44.3 -43.9 -44.4 72 -99 SPO 1997 10 02 09 03 310 4.6 -9 687.60 -44.3 -43.9 -44.4 71 -99 SPO 1997 10 02 09 04 308 4.8 -9 687.60 -44.3 -43.8 -44.4 71 -99 SPO 1997 10 02 09 05 309 4.7 -9 687.60 -44.2 -43.9 -44.3 71 -99 SPO 1997 10 02 09 06 309 4.6 -9 687.60 -44.2 -43.8 -44.2 72 -99 SPO 1997 10 02 09 07 307 4.8 -9 687.60 -44.2 -43.9 -44.2 71 -99 SPO 1997 10 02 09 08 311 4.6 -9 687.60 -44.1 -44.0 -44.2 71 -99 SPO 1997 10 02 09 09 312 4.7 -9 687.60 -44.1 -44.0 -44.2 71 -99 SPO 1997 10 02 09 10 314 4.9 -9 687.60 -44.1 -43.9 -44.2 71 -99 SPO 1997 10 02 09 11 314 4.7 -9 687.60 -44.1 -44.0 -44.1 71 -99 SPO 1997 10 02 09 12 311 4.6 -9 687.60 -44.0 -43.9 -44.1 71 -99 SPO 1997 10 02 09 13 314 4.5 -9 687.60 -44.0 -43.8 -44.0 71 -99 SPO 1997 10 02 09 14 313 4.4 -9 687.60 -43.9 -43.8 -44.0 71 -99 SPO 1997 10 02 09 15 314 4.7 -9 687.60 -43.9 -44.0 -44.0 72 -99 SPO 1997 10 02 09 16 315 4.2 -9 687.60 -43.9 -44.0 -44.0 72 -99 SPO 1997 10 02 09 17 313 4.4 -9 687.60 -43.8 -43.8 -44.0 72 -99 SPO 1997 10 02 09 18 310 5.1 -9 687.60 -43.9 -43.7 -43.9 73 -99 SPO 1997 10 02 09 19 310 4.6 -9 687.60 -43.8 -43.8 -43.8 72 -99 SPO 1997 10 02 09 20 304 4.5 -9 687.60 -43.8 -43.8 -43.8 72 -99 SPO 1997 10 02 09 21 307 4.5 -9 687.60 -43.7 -43.9 -43.8 71 -99 SPO 1997 10 02 09 22 306 4.5 -9 687.70 -43.7 -43.8 -43.8 71 -99 SPO 1997 10 02 09 23 305 4.3 -9 687.60 -43.7 -43.8 -43.8 71 -99 SPO 1997 10 02 09 24 307 4.3 -9 687.60 -43.7 -43.9 -43.8 71 -99 SPO 1997 10 02 09 25 307 4.3 -9 687.60 -43.7 -43.9 -43.8 71 -99 SPO 1997 10 02 09 26 307 3.9 -9 687.60 -43.7 -43.9 -43.8 71 -99 SPO 1997 10 02 09 27 308 3.9 -9 687.60 -43.7 -44.0 -43.8 71 -99 SPO 1997 10 02 09 28 305 4.3 -9 687.60 -43.7 -43.9 -43.8 71 -99 SPO 1997 10 02 09 29 305 4.4 -9 687.60 -43.7 -43.9 -43.8 72 -99 SPO 1997 10 02 09 30 307 4.2 -9 687.60 -43.7 -43.9 -43.8 72 -99 SPO 1997 10 02 09 31 304 4.5 -9 687.60 -43.7 -43.9 -43.8 72 -99 SPO 1997 10 02 09 32 303 4.2 -9 687.60 -43.7 -44.0 -43.8 72 -99 SPO 1997 10 02 09 33 309 3.6 -9 687.60 -43.7 -44.0 -43.7 72 -99 SPO 1997 10 02 09 34 311 4.0 -9 687.60 -43.7 -44.0 -43.8 71 -99 SPO 1997 10 02 09 35 307 3.8 -9 687.70 -43.7 -44.0 -43.8 71 -99 SPO 1997 10 02 09 36 306 3.5 -9 687.70 -43.8 -44.0 -43.8 71 -99 SPO 1997 10 02 09 37 310 3.5 -9 687.70 -43.8 -44.0 -43.8 71 -99 SPO 1997 10 02 09 38 309 3.5 -9 687.70 -43.8 -44.0 -43.8 71 -99 SPO 1997 10 02 09 39 304 3.5 -9 687.70 -43.7 -44.0 -43.8 71 -99 SPO 1997 10 02 09 40 302 3.2 -9 687.70 -43.6 -43.8 -43.7 71 -99 SPO 1997 10 02 09 41 302 3.3 -9 687.70 -43.6 -43.8 -43.6 71 -99 SPO 1997 10 02 09 42 307 3.3 -9 687.70 -43.6 -43.8 -43.6 71 -99 SPO 1997 10 02 09 43 305 3.4 -9 687.70 -43.6 -43.8 -43.7 71 -99 SPO 1997 10 02 09 44 297 3.7 -9 687.70 -43.6 -43.8 -43.7 72 -99 SPO 1997 10 02 09 45 298 3.6 -9 687.70 -43.6 -43.7 -43.7 72 -99 SPO 1997 10 02 09 46 299 3.9 -9 687.70 -43.6 -43.7 -43.6 72 -99 SPO 1997 10 02 09 47 300 3.7 -9 687.70 -43.6 -43.7 -43.7 71 -99 SPO 1997 10 02 09 48 299 3.8 -9 687.70 -43.6 -43.8 -43.7 71 -99 SPO 1997 10 02 09 49 301 3.6 -9 687.70 -43.7 -43.9 -43.7 71 -99 SPO 1997 10 02 09 50 300 4.2 -9 687.70 -43.7 -44.0 -43.7 71 -99 SPO 1997 10 02 09 51 301 4.0 -9 687.60 -43.7 -44.0 -43.8 71 -99 SPO 1997 10 02 09 52 304 3.9 -9 687.60 -43.7 -44.0 -43.8 72 -99 SPO 1997 10 02 09 53 304 4.1 -9 687.60 -43.7 -44.0 -43.8 72 -99 SPO 1997 10 02 09 54 303 4.1 -9 687.60 -43.8 -44.0 -43.8 73 -99 SPO 1997 10 02 09 55 302 3.7 -9 687.70 -43.7 -44.0 -43.8 72 -99 SPO 1997 10 02 09 56 302 3.5 -9 687.70 -43.7 -44.0 -43.7 72 -99 SPO 1997 10 02 09 57 302 3.3 -9 687.70 -43.7 -43.9 -43.7 72 -99 SPO 1997 10 02 09 58 301 3.2 -9 687.80 -43.6 -43.9 -43.7 71 -99 SPO 1997 10 02 09 59 300 3.4 -9 687.80 -43.7 -43.9 -43.7 72 -99 SPO 1997 10 02 10 00 298 3.4 -9 687.80 -43.7 -43.9 -43.7 72 0 SPO 1997 10 02 10 01 299 3.4 -9 687.70 -43.7 -43.9 -43.7 72 -99 SPO 1997 10 02 10 02 301 3.5 -9 687.70 -43.7 -43.9 -43.7 71 -99 SPO 1997 10 02 10 03 300 3.7 -9 687.70 -43.7 -43.8 -43.7 71 -99 SPO 1997 10 02 10 04 299 4.0 -9 687.70 -43.7 -43.7 -43.7 71 -99 SPO 1997 10 02 10 05 298 4.0 -9 687.70 -43.6 -43.7 -43.7 71 -99 SPO 1997 10 02 10 06 299 4.1 -9 687.70 -43.6 -43.6 -43.7 71 -99 SPO 1997 10 02 10 07 299 4.0 -9 687.70 -43.6 -43.6 -43.7 71 -99 SPO 1997 10 02 10 08 298 3.9 -9 687.70 -43.6 -43.5 -43.6 71 -99 SPO 1997 10 02 10 09 297 3.9 -9 687.70 -43.6 -43.6 -43.6 72 -99 SPO 1997 10 02 10 10 300 4.0 -9 687.70 -43.5 -43.6 -43.6 72 -99 SPO 1997 10 02 10 11 300 3.8 -9 687.70 -43.5 -43.6 -43.6 72 -99 SPO 1997 10 02 10 12 297 3.7 -9 687.70 -43.6 -43.5 -43.6 74 -99 SPO 1997 10 02 10 13 293 3.8 -9 687.70 -43.5 -43.5 -43.5 73 -99 SPO 1997 10 02 10 14 293 4.0 -9 687.70 -43.4 -43.4 -43.5 72 -99 SPO 1997 10 02 10 15 292 3.9 -9 687.70 -43.4 -43.3 -43.4 71 -99 SPO 1997 10 02 10 16 291 4.0 -9 687.70 -43.4 -43.2 -43.3 71 -99 SPO 1997 10 02 10 17 293 3.9 -9 687.70 -43.2 -43.2 -43.3 69 -99 SPO 1997 10 02 10 18 292 4.0 -9 687.70 -43.1 -43.1 -43.2 69 -99 SPO 1997 10 02 10 19 291 3.8 -9 687.70 -43.1 -43.0 -43.2 70 -99 SPO 1997 10 02 10 20 293 3.8 -9 687.70 -43.1 -42.9 -43.2 72 -99 SPO 1997 10 02 10 21 292 3.7 -9 687.70 -43.1 -43.0 -43.2 72 -99 SPO 1997 10 02 10 22 293 3.4 -9 687.70 -43.1 -43.1 -43.1 72 -99 SPO 1997 10 02 10 23 294 3.9 -9 687.70 -43.0 -43.0 -43.1 72 -99 SPO 1997 10 02 10 24 295 4.1 -9 687.70 -43.0 -43.1 -43.1 72 -99 SPO 1997 10 02 10 25 294 4.0 -9 687.70 -43.0 -43.0 -43.0 72 -99 SPO 1997 10 02 10 26 291 4.0 -9 687.70 -42.9 -43.1 -43.0 72 -99 SPO 1997 10 02 10 27 292 3.9 -9 687.70 -42.9 -43.1 -43.0 72 -99 SPO 1997 10 02 10 28 293 3.8 -9 687.70 -42.9 -43.1 -43.0 72 -99 SPO 1997 10 02 10 29 295 3.9 -9 687.60 -42.9 -43.1 -43.0 72 -99 SPO 1997 10 02 10 30 293 4.0 -9 687.60 -42.9 -43.2 -43.0 72 -99 SPO 1997 10 02 10 31 292 4.3 -9 687.60 -42.9 -43.2 -43.0 72 -99 SPO 1997 10 02 10 32 291 4.3 -9 687.60 -42.9 -43.0 -43.0 72 -99 SPO 1997 10 02 10 33 294 4.4 -9 687.60 -42.9 -42.8 -43.0 72 -99 SPO 1997 10 02 10 34 297 4.7 -9 687.60 -42.9 -42.9 -42.9 72 -99 SPO 1997 10 02 10 35 299 4.2 -9 687.60 -42.9 -42.9 -42.9 72 -99 SPO 1997 10 02 10 36 299 4.4 -9 687.60 -42.9 -43.0 -42.9 72 -99 SPO 1997 10 02 10 37 298 4.3 -9 687.60 -42.8 -43.0 -42.8 72 -99 SPO 1997 10 02 10 38 299 4.2 -9 687.60 -42.7 -43.0 -42.8 71 -99 SPO 1997 10 02 10 39 300 4.5 -9 687.60 -42.7 -42.9 -42.8 71 -99 SPO 1997 10 02 10 40 301 4.6 -9 687.60 -42.7 -42.7 -42.8 72 -99 SPO 1997 10 02 10 41 301 4.7 -9 687.60 -42.7 -42.7 -42.8 72 -99 SPO 1997 10 02 10 42 302 4.5 -9 687.60 -42.6 -42.5 -42.7 72 -99 SPO 1997 10 02 10 43 302 4.7 -9 687.60 -42.6 -42.5 -42.7 71 -99 SPO 1997 10 02 10 44 302 4.7 -9 687.60 -42.6 -42.6 -42.7 71 -99 SPO 1997 10 02 10 45 304 4.7 -9 687.60 -42.6 -42.5 -42.6 72 -99 SPO 1997 10 02 10 46 302 4.5 -9 687.60 -42.5 -42.6 -42.6 72 -99 SPO 1997 10 02 10 47 297 4.5 -9 687.60 -42.5 -42.7 -42.5 74 -99 SPO 1997 10 02 10 48 297 4.5 -9 687.60 -42.4 -42.5 -42.5 73 -99 SPO 1997 10 02 10 49 295 4.6 -9 687.60 -42.4 -42.6 -42.4 74 -99 SPO 1997 10 02 10 50 297 5.0 -9 687.60 -42.3 -42.2 -42.3 73 -99 SPO 1997 10 02 10 51 296 4.9 -9 687.60 -42.2 -42.2 -42.2 73 -99 SPO 1997 10 02 10 52 296 5.0 -9 687.60 -42.1 -42.4 -42.2 73 -99 SPO 1997 10 02 10 53 296 4.7 -9 687.60 -42.1 -42.3 -42.2 73 -99 SPO 1997 10 02 10 54 294 4.6 -9 687.60 -42.1 -42.2 -42.1 73 -99 SPO 1997 10 02 10 55 294 5.0 -9 687.60 -42.0 -42.1 -42.1 73 -99 SPO 1997 10 02 10 56 292 5.1 -9 687.60 -42.0 -41.9 -42.0 73 -99 SPO 1997 10 02 10 57 292 4.9 -9 687.60 -41.9 -41.8 -41.9 72 -99 SPO 1997 10 02 10 58 292 4.9 -9 687.60 -41.8 -41.6 -41.9 71 -99 SPO 1997 10 02 10 59 292 5.2 -9 687.60 -41.8 -41.4 -41.8 72 -99 SPO 1997 10 02 11 00 288 5.5 -9 687.60 -41.6 -41.4 -41.6 71 0 SPO 1997 10 02 11 01 289 5.5 -9 687.50 -41.5 -41.4 -41.5 72 -99 SPO 1997 10 02 11 02 287 5.6 -9 687.50 -41.4 -41.2 -41.4 73 -99 SPO 1997 10 02 11 03 287 5.4 -9 687.50 -41.3 -41.3 -41.4 73 -99 SPO 1997 10 02 11 04 288 5.6 -9 687.50 -41.3 -41.2 -41.4 74 -99 SPO 1997 10 02 11 05 286 5.5 -9 687.50 -41.3 -41.3 -41.3 74 -99 SPO 1997 10 02 11 06 289 5.8 -9 687.50 -41.2 -41.2 -41.2 74 -99 SPO 1997 10 02 11 07 286 5.6 -9 687.50 -41.1 -41.0 -41.2 73 -99 SPO 1997 10 02 11 08 285 5.9 -9 687.50 -41.0 -41.2 -41.1 73 -99 SPO 1997 10 02 11 09 285 5.8 -9 687.50 -41.0 -41.2 -41.1 73 -99 SPO 1997 10 02 11 10 288 5.7 -9 687.50 -41.0 -41.2 -41.1 73 -99 SPO 1997 10 02 11 11 290 5.4 -9 687.60 -41.0 -41.2 -41.1 72 -99 SPO 1997 10 02 11 12 288 5.4 -9 687.60 -41.0 -41.3 -41.1 72 -99 SPO 1997 10 02 11 13 287 5.9 -9 687.60 -41.0 -41.2 -41.1 72 -99 SPO 1997 10 02 11 14 288 5.7 -9 687.60 -41.0 -41.3 -41.1 72 -99 SPO 1997 10 02 11 15 287 5.5 -9 687.50 -41.0 -41.2 -41.1 73 -99 SPO 1997 10 02 11 16 287 5.7 -9 687.60 -41.0 -41.2 -41.1 74 -99 SPO 1997 10 02 11 17 287 5.7 -9 687.50 -41.0 -41.3 -41.1 74 -99 SPO 1997 10 02 11 18 286 5.4 -9 687.50 -41.0 -41.2 -41.1 74 -99 SPO 1997 10 02 11 19 287 5.4 -9 687.50 -41.0 -41.2 -41.0 74 -99 SPO 1997 10 02 11 20 287 5.9 -9 687.50 -41.0 -41.1 -41.0 74 -99 SPO 1997 10 02 11 21 284 5.9 -9 687.50 -40.9 -41.0 -41.0 73 -99 SPO 1997 10 02 11 22 285 5.4 -9 687.50 -40.9 -40.9 -40.9 72 -99 SPO 1997 10 02 11 23 284 5.9 -9 687.50 -40.8 -40.9 -40.8 72 -99 SPO 1997 10 02 11 24 284 5.5 -9 687.50 -40.8 -41.0 -40.8 72 -99 SPO 1997 10 02 11 25 286 5.4 -9 687.50 -40.7 -41.0 -40.8 71 -99 SPO 1997 10 02 11 26 286 5.8 -9 687.50 -40.7 -41.0 -40.8 73 -99 SPO 1997 10 02 11 27 286 5.6 -9 687.50 -40.7 -41.0 -40.8 73 -99 SPO 1997 10 02 11 28 286 5.8 -9 687.50 -40.7 -41.0 -40.8 73 -99 SPO 1997 10 02 11 29 285 6.0 -9 687.50 -40.7 -41.0 -40.8 74 -99 SPO 1997 10 02 11 30 285 6.2 -9 687.50 -40.7 -41.0 -40.8 74 -99 SPO 1997 10 02 11 31 285 5.7 -9 687.50 -40.7 -41.0 -40.8 74 -99 SPO 1997 10 02 11 32 284 5.6 -9 687.50 -40.7 -41.0 -40.8 74 -99 SPO 1997 10 02 11 33 283 5.3 -9 687.50 -40.6 -40.9 -40.7 73 -99 SPO 1997 10 02 11 34 284 4.8 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 11 35 283 5.6 -9 687.50 -40.6 -40.8 -40.6 73 -99 SPO 1997 10 02 11 36 280 5.8 -9 687.50 -40.5 -40.6 -40.6 73 -99 SPO 1997 10 02 11 37 280 6.0 -9 687.50 -40.4 -40.5 -40.4 73 -99 SPO 1997 10 02 11 38 278 6.0 -9 687.60 -40.4 -40.5 -40.4 74 -99 SPO 1997 10 02 11 39 279 5.6 -9 687.60 -40.3 -40.5 -40.4 73 -99 SPO 1997 10 02 11 40 278 5.2 -9 687.60 -40.3 -40.5 -40.4 73 -99 SPO 1997 10 02 11 41 282 5.5 -9 687.60 -40.3 -40.5 -40.4 72 -99 SPO 1997 10 02 11 42 280 5.9 -9 687.60 -40.3 -40.6 -40.4 72 -99 SPO 1997 10 02 11 43 283 5.8 -9 687.50 -40.4 -40.7 -40.5 74 -99 SPO 1997 10 02 11 44 281 5.7 -9 687.50 -40.4 -40.8 -40.5 74 -99 SPO 1997 10 02 11 45 281 5.7 -9 687.50 -40.4 -40.8 -40.5 74 -99 SPO 1997 10 02 11 46 282 6.1 -9 687.50 -40.4 -40.8 -40.6 74 -99 SPO 1997 10 02 11 47 280 6.1 -9 687.50 -40.4 -40.8 -40.5 73 -99 SPO 1997 10 02 11 48 281 6.4 -9 687.50 -40.4 -40.8 -40.6 73 -99 SPO 1997 10 02 11 49 281 5.9 -9 687.50 -40.5 -40.8 -40.6 73 -99 SPO 1997 10 02 11 50 280 6.2 -9 687.50 -40.5 -40.8 -40.6 73 -99 SPO 1997 10 02 11 51 280 6.3 -9 687.50 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 11 52 280 6.2 -9 687.50 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 11 53 283 5.9 -9 687.40 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 11 54 281 6.7 -9 687.40 -40.5 -40.8 -40.6 72 -99 SPO 1997 10 02 11 55 281 6.7 -9 687.40 -40.5 -40.8 -40.6 72 -99 SPO 1997 10 02 11 56 281 6.1 -9 687.40 -40.5 -40.7 -40.6 72 -99 SPO 1997 10 02 11 57 281 6.5 -9 687.50 -40.5 -40.8 -40.6 72 -99 SPO 1997 10 02 11 58 282 6.4 -9 687.50 -40.5 -40.8 -40.6 72 -99 SPO 1997 10 02 11 59 282 6.0 -9 687.50 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 00 282 5.9 -9 687.50 -40.6 -40.8 -40.7 74 0 SPO 1997 10 02 12 01 283 5.7 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 02 284 5.2 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 03 286 4.9 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 04 281 5.2 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 05 282 5.5 -9 687.50 -40.6 -40.8 -40.6 74 -99 SPO 1997 10 02 12 06 283 5.2 -9 687.50 -40.6 -40.8 -40.6 74 -99 SPO 1997 10 02 12 07 284 5.4 -9 687.50 -40.6 -40.8 -40.7 74 -99 SPO 1997 10 02 12 08 282 5.4 -9 687.50 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 09 283 5.7 -9 687.50 -40.6 -40.8 -40.7 72 -99 SPO 1997 10 02 12 10 280 5.5 -9 687.60 -40.6 -40.8 -40.7 71 -99 SPO 1997 10 02 12 11 281 5.7 -9 687.60 -40.6 -40.8 -40.7 71 -99 SPO 1997 10 02 12 12 281 5.0 -9 687.60 -40.6 -40.8 -40.7 72 -99 SPO 1997 10 02 12 13 281 5.4 -9 687.60 -40.6 -40.8 -40.7 72 -99 SPO 1997 10 02 12 14 281 5.5 -9 687.60 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 15 281 5.7 -9 687.60 -40.6 -40.8 -40.8 73 -99 SPO 1997 10 02 12 16 281 5.4 -9 687.60 -40.7 -40.9 -40.8 74 -99 SPO 1997 10 02 12 17 282 5.5 -9 687.60 -40.7 -40.9 -40.8 74 -99 SPO 1997 10 02 12 18 282 5.3 -9 687.60 -40.7 -40.9 -40.8 74 -99 SPO 1997 10 02 12 19 284 4.9 -9 687.60 -40.7 -40.9 -40.8 73 -99 SPO 1997 10 02 12 20 287 4.6 -9 687.60 -40.7 -40.8 -40.8 73 -99 SPO 1997 10 02 12 21 287 4.7 -9 687.60 -40.7 -40.9 -40.8 73 -99 SPO 1997 10 02 12 22 285 4.8 -9 687.60 -40.8 -41.0 -40.9 74 -99 SPO 1997 10 02 12 23 286 5.3 -9 687.60 -40.8 -41.1 -40.9 72 -99 SPO 1997 10 02 12 24 283 5.2 -9 687.60 -40.8 -41.1 -40.9 71 -99 SPO 1997 10 02 12 25 281 4.8 -9 687.60 -40.8 -41.2 -40.9 71 -99 SPO 1997 10 02 12 26 279 4.8 -9 687.60 -40.9 -41.2 -41.0 71 -99 SPO 1997 10 02 12 27 279 4.9 -9 687.60 -40.9 -41.2 -41.0 72 -99 SPO 1997 10 02 12 28 280 5.2 -9 687.60 -40.9 -41.2 -41.0 72 -99 SPO 1997 10 02 12 29 281 4.9 -9 687.60 -40.9 -41.2 -41.0 72 -99 SPO 1997 10 02 12 30 280 5.1 -9 687.60 -40.9 -41.2 -41.0 72 -99 SPO 1997 10 02 12 31 280 4.8 -9 687.60 -40.9 -41.2 -41.0 72 -99 SPO 1997 10 02 12 32 279 4.4 -9 687.60 -40.9 -41.1 -41.0 72 -99 SPO 1997 10 02 12 33 278 4.3 -9 687.70 -40.9 -41.1 -41.0 72 -99 SPO 1997 10 02 12 34 277 4.5 -9 687.70 -40.9 -41.1 -41.0 72 -99 SPO 1997 10 02 12 35 277 4.4 -9 687.70 -40.9 -41.1 -41.0 72 -99 SPO 1997 10 02 12 36 278 5.2 -9 687.60 -40.9 -41.0 -40.9 72 -99 SPO 1997 10 02 12 37 276 5.1 -9 687.60 -40.8 -40.9 -40.9 71 -99 SPO 1997 10 02 12 38 276 5.4 -9 687.60 -40.8 -40.9 -40.8 71 -99 SPO 1997 10 02 12 39 276 6.1 -9 687.60 -40.7 -40.8 -40.8 70 -99 SPO 1997 10 02 12 40 275 6.1 -9 687.60 -40.7 -40.8 -40.7 70 -99 SPO 1997 10 02 12 41 275 6.1 -9 687.60 -40.6 -40.8 -40.7 70 -99 SPO 1997 10 02 12 42 276 5.8 -9 687.60 -40.6 -40.8 -40.7 73 -99 SPO 1997 10 02 12 43 275 5.7 -9 687.60 -40.6 -40.8 -40.7 74 -99 SPO 1997 10 02 12 44 275 5.7 -9 687.60 -40.6 -40.8 -40.7 74 -99 SPO 1997 10 02 12 45 273 5.7 -9 687.60 -40.6 -40.8 -40.6 74 -99 SPO 1997 10 02 12 46 271 5.5 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 47 272 5.8 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 48 272 6.4 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 49 271 6.8 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 50 270 6.1 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 51 269 6.1 -9 687.70 -40.5 -40.8 -40.6 74 -99 SPO 1997 10 02 12 52 270 6.3 -9 687.70 -40.5 -40.8 -40.6 73 -99 SPO 1997 10 02 12 53 270 6.2 -9 687.70 -40.5 -40.8 -40.5 72 -99 SPO 1997 10 02 12 54 270 6.0 -9 687.70 -40.5 -40.7 -40.5 72 -99 SPO 1997 10 02 12 55 268 6.1 -9 687.80 -40.4 -40.7 -40.5 71 -99 SPO 1997 10 02 12 56 269 5.4 -9 687.80 -40.4 -40.7 -40.5 71 -99 SPO 1997 10 02 12 57 268 5.9 -9 687.80 -40.4 -40.6 -40.5 72 -99 SPO 1997 10 02 12 58 270 5.3 -9 687.80 -40.4 -40.6 -40.4 73 -99 SPO 1997 10 02 12 59 271 5.4 -9 687.70 -40.4 -40.6 -40.4 73 -99 SPO 1997 10 02 13 00 272 5.3 -9 687.70 -40.3 -40.5 -40.4 72 0 SPO 1997 10 02 13 01 271 6.1 -9 687.80 -40.3 -40.5 -40.4 71 -99 SPO 1997 10 02 13 02 270 5.8 -9 687.80 -40.2 -40.5 -40.3 71 -99 SPO 1997 10 02 13 03 271 5.2 -9 687.80 -40.2 -40.5 -40.3 73 -99 SPO 1997 10 02 13 04 269 5.4 -9 687.90 -40.2 -40.5 -40.3 74 -99 SPO 1997 10 02 13 05 269 5.9 -9 687.90 -40.2 -40.4 -40.3 74 -99 SPO 1997 10 02 13 06 269 5.6 -9 687.90 -40.2 -40.4 -40.2 74 -99 SPO 1997 10 02 13 07 268 5.4 -9 687.90 -40.1 -40.4 -40.2 72 -99 SPO 1997 10 02 13 08 270 5.2 -9 687.90 -40.1 -40.4 -40.2 72 -99 SPO 1997 10 02 13 09 269 5.4 -9 687.90 -40.1 -40.4 -40.2 71 -99 SPO 1997 10 02 13 10 268 5.5 -9 687.90 -40.1 -40.3 -40.2 71 -99 SPO 1997 10 02 13 11 268 5.8 -9 687.90 -40.1 -40.3 -40.1 72 -99 SPO 1997 10 02 13 12 269 5.2 -9 687.90 -40.0 -40.2 -40.1 72 -99 SPO 1997 10 02 13 13 268 5.1 -9 687.90 -40.0 -40.2 -40.1 72 -99 SPO 1997 10 02 13 14 267 5.1 -9 687.90 -40.0 -40.2 -40.0 73 -99 SPO 1997 10 02 13 15 269 5.2 -9 687.90 -40.0 -40.1 -40.0 74 -99 SPO 1997 10 02 13 16 268 5.6 -9 687.90 -40.0 -40.1 -40.0 74 -99 SPO 1997 10 02 13 17 268 5.5 -9 687.80 -39.9 -40.0 -40.0 73 -99 SPO 1997 10 02 13 18 269 5.6 -9 687.80 -39.8 -40.0 -39.9 73 -99 SPO 1997 10 02 13 19 268 4.9 -9 687.80 -39.8 -40.0 -39.9 73 -99 SPO 1997 10 02 13 20 268 5.0 -9 687.80 -39.8 -39.9 -39.9 72 -99 SPO 1997 10 02 13 21 269 5.3 -9 687.80 -39.8 -39.9 -39.8 72 -99 SPO 1997 10 02 13 22 270 5.2 -9 687.80 -39.8 -40.0 -39.8 72 -99 SPO 1997 10 02 13 23 269 5.1 -9 687.80 -39.8 -40.0 -39.8 72 -99 SPO 1997 10 02 13 24 268 5.8 -9 687.90 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 02 13 25 269 5.8 -9 687.90 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 02 13 26 270 5.5 -9 687.80 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 02 13 27 269 5.6 -9 687.80 -39.7 -39.9 -39.8 74 -99 SPO 1997 10 02 13 28 269 5.8 -9 687.90 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 02 13 29 269 5.9 -9 687.90 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 13 30 269 5.3 -9 687.90 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 02 13 31 269 5.4 -9 687.90 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 13 32 267 5.2 -9 687.90 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 33 268 5.2 -9 687.90 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 34 266 5.8 -9 687.90 -39.6 -39.8 -39.7 72 -99 SPO 1997 10 02 13 35 266 5.8 -9 687.90 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 36 267 5.5 -9 687.90 -39.6 -39.8 -39.7 72 -99 SPO 1997 10 02 13 37 269 5.7 -9 687.80 -39.6 -39.8 -39.7 72 -99 SPO 1997 10 02 13 38 270 5.2 -9 687.80 -39.6 -39.7 -39.7 72 -99 SPO 1997 10 02 13 39 271 4.9 -9 687.90 -39.6 -39.7 -39.6 72 -99 SPO 1997 10 02 13 40 270 5.2 -9 687.90 -39.6 -39.8 -39.6 72 -99 SPO 1997 10 02 13 41 270 5.5 -9 687.80 -39.6 -39.8 -39.6 72 -99 SPO 1997 10 02 13 42 269 5.0 -9 687.80 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 43 269 5.2 -9 687.80 -39.6 -39.8 -39.7 74 -99 SPO 1997 10 02 13 44 269 5.2 -9 687.80 -39.6 -39.9 -39.7 74 -99 SPO 1997 10 02 13 45 268 4.7 -9 687.80 -39.6 -39.9 -39.7 74 -99 SPO 1997 10 02 13 46 270 5.3 -9 687.80 -39.6 -39.9 -39.7 74 -99 SPO 1997 10 02 13 47 270 5.3 -9 687.80 -39.6 -39.9 -39.7 74 -99 SPO 1997 10 02 13 48 270 5.4 -9 687.80 -39.6 -39.8 -39.7 74 -99 SPO 1997 10 02 13 49 269 5.0 -9 687.80 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 50 270 5.4 -9 687.80 -39.6 -39.8 -39.7 73 -99 SPO 1997 10 02 13 51 271 5.5 -9 687.80 -39.6 -39.8 -39.7 72 -99 SPO 1997 10 02 13 52 270 4.9 -9 687.80 -39.6 -39.8 -39.6 72 -99 SPO 1997 10 02 13 53 269 5.3 -9 687.90 -39.6 -39.8 -39.6 72 -99 SPO 1997 10 02 13 54 270 5.2 -9 687.90 -39.6 -39.8 -39.6 72 -99 SPO 1997 10 02 13 55 270 5.2 -9 687.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 02 13 56 269 5.2 -9 687.90 -39.5 -39.7 -39.6 74 -99 SPO 1997 10 02 13 57 270 5.1 -9 687.90 -39.5 -39.7 -39.6 74 -99 SPO 1997 10 02 13 58 269 5.3 -9 687.90 -39.5 -39.7 -39.6 74 -99 SPO 1997 10 02 13 59 270 5.7 -9 687.90 -39.5 -39.7 -39.6 74 -99 SPO 1997 10 02 14 00 269 5.8 -9 687.90 -39.5 -39.7 -39.6 73 0 SPO 1997 10 02 14 01 268 5.5 -9 687.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 02 14 02 270 5.4 -9 687.80 -39.5 -39.8 -39.6 73 -99 SPO 1997 10 02 14 03 270 5.5 -9 687.80 -39.5 -39.8 -39.6 73 -99 SPO 1997 10 02 14 04 270 5.5 -9 687.80 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 02 14 05 270 5.3 -9 687.80 -39.5 -39.8 -39.7 73 -99 SPO 1997 10 02 14 06 269 5.6 -9 687.80 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 14 07 270 5.3 -9 687.80 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 14 08 272 5.2 -9 687.80 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 14 09 271 5.3 -9 687.80 -39.6 -39.9 -39.7 72 -99 SPO 1997 10 02 14 10 270 5.5 -9 687.80 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 14 11 269 5.7 -9 687.80 -39.6 -39.9 -39.7 73 -99 SPO 1997 10 02 14 12 270 5.6 -9 687.80 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 02 14 13 269 5.9 -9 687.80 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 02 14 14 268 5.3 -9 687.90 -39.7 -39.9 -39.8 74 -99 SPO 1997 10 02 14 15 268 5.5 -9 687.90 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 02 14 16 268 5.3 -9 687.90 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 02 14 17 268 5.7 -9 687.90 -39.7 -40.0 -39.8 72 -99 SPO 1997 10 02 14 18 269 6.1 -9 687.90 -39.7 -40.0 -39.8 72 -99 SPO 1997 10 02 14 19 268 5.8 -9 687.90 -39.8 -40.0 -39.9 73 -99 SPO 1997 10 02 14 20 267 5.9 -9 687.90 -39.8 -40.0 -39.9 73 -99 SPO 1997 10 02 14 21 269 5.2 -9 687.90 -39.8 -40.0 -39.9 72 -99 SPO 1997 10 02 14 22 268 5.2 -9 687.90 -39.8 -40.1 -39.9 72 -99 SPO 1997 10 02 14 23 269 5.3 -9 687.90 -39.9 -40.1 -40.0 71 -99 SPO 1997 10 02 14 24 269 5.0 -9 687.90 -39.9 -40.2 -40.0 71 -99 SPO 1997 10 02 14 25 270 4.7 -9 687.80 -39.9 -40.2 -40.0 72 -99 SPO 1997 10 02 14 26 269 5.0 -9 687.80 -39.9 -40.2 -40.0 73 -99 SPO 1997 10 02 14 27 271 5.1 -9 687.80 -40.0 -40.2 -40.0 74 -99 SPO 1997 10 02 14 28 270 4.8 -9 687.90 -40.0 -40.2 -40.0 74 -99 SPO 1997 10 02 14 29 269 4.9 -9 687.90 -40.0 -40.2 -40.1 74 -99 SPO 1997 10 02 14 30 268 5.0 -9 687.90 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 02 14 31 266 5.1 -9 687.90 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 02 14 32 266 5.5 -9 687.90 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 02 14 33 267 5.3 -9 687.90 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 02 14 34 266 5.2 -9 687.90 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 02 14 35 265 4.8 -9 687.90 -40.1 -40.2 -40.1 74 -99 SPO 1997 10 02 14 36 268 4.6 -9 688.00 -40.1 -40.2 -40.1 74 -99 SPO 1997 10 02 14 37 266 5.1 -9 688.00 -40.0 -40.2 -40.1 72 -99 SPO 1997 10 02 14 38 266 4.6 -9 688.00 -40.1 -40.2 -40.1 72 -99 SPO 1997 10 02 14 39 267 5.0 -9 688.00 -40.1 -40.2 -40.1 72 -99 SPO 1997 10 02 14 40 267 4.8 -9 688.00 -40.1 -40.2 -40.1 73 -99 SPO 1997 10 02 14 41 267 4.7 -9 688.00 -40.1 -40.2 -40.1 72 -99 SPO 1997 10 02 14 42 268 5.2 -9 688.00 -40.1 -40.3 -40.2 72 -99 SPO 1997 10 02 14 43 268 5.2 -9 688.00 -40.1 -40.3 -40.2 73 -99 SPO 1997 10 02 14 44 270 5.1 -9 688.00 -40.2 -40.4 -40.2 74 -99 SPO 1997 10 02 14 45 269 4.9 -9 688.00 -40.2 -40.4 -40.2 73 -99 SPO 1997 10 02 14 46 267 4.5 -9 688.00 -40.2 -40.4 -40.3 73 -99 SPO 1997 10 02 14 47 268 4.6 -9 688.00 -40.2 -40.4 -40.3 73 -99 SPO 1997 10 02 14 48 267 4.6 -9 688.00 -40.3 -40.5 -40.3 74 -99 SPO 1997 10 02 14 49 268 4.6 -9 688.00 -40.3 -40.5 -40.4 73 -99 SPO 1997 10 02 14 50 269 4.6 -9 688.00 -40.3 -40.5 -40.4 73 -99 SPO 1997 10 02 14 51 268 5.0 -9 688.00 -40.4 -40.5 -40.4 73 -99 SPO 1997 10 02 14 52 269 4.8 -9 688.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 10 02 14 53 271 4.6 -9 688.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 10 02 14 54 272 4.4 -9 688.00 -40.5 -40.6 -40.6 72 -99 SPO 1997 10 02 14 55 273 4.3 -9 687.90 -40.5 -40.6 -40.6 72 -99 SPO 1997 10 02 14 56 274 4.2 -9 687.90 -40.5 -40.6 -40.6 73 -99 SPO 1997 10 02 14 57 275 4.0 -9 687.90 -40.5 -40.6 -40.6 73 -99 SPO 1997 10 02 14 58 274 3.9 -9 687.90 -40.6 -40.6 -40.6 73 -99 SPO 1997 10 02 14 59 274 4.1 -9 687.90 -40.6 -40.6 -40.6 73 -99 SPO 1997 10 02 15 00 273 4.2 -9 687.90 -40.6 -40.6 -40.6 73 0 SPO 1997 10 02 15 01 273 4.2 -9 687.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 10 02 15 02 273 4.6 -9 687.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 10 02 15 03 272 4.5 -9 687.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 10 02 15 04 273 4.6 -9 687.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 10 02 15 05 271 4.6 -9 687.90 -40.6 -40.7 -40.6 73 -99 SPO 1997 10 02 15 06 270 4.5 -9 687.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 10 02 15 07 271 4.6 -9 687.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 10 02 15 08 273 4.4 -9 687.90 -40.6 -40.7 -40.6 71 -99 SPO 1997 10 02 15 09 275 4.0 -9 687.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 10 02 15 10 275 3.8 -9 687.90 -40.6 -40.6 -40.6 73 -99 SPO 1997 10 02 15 11 274 3.8 -9 687.90 -40.6 -40.6 -40.6 73 -99 SPO 1997 10 02 15 12 274 3.7 -9 687.90 -40.5 -40.6 -40.6 73 -99 SPO 1997 10 02 15 13 274 3.5 -9 688.00 -40.5 -40.6 -40.5 74 -99 SPO 1997 10 02 15 14 273 3.5 -9 688.00 -40.5 -40.5 -40.5 74 -99 SPO 1997 10 02 15 15 273 3.5 -9 688.00 -40.5 -40.5 -40.5 73 -99 SPO 1997 10 02 15 16 269 3.7 -9 688.00 -40.5 -40.4 -40.5 72 -99 SPO 1997 10 02 15 17 268 4.0 -9 687.90 -40.5 -40.4 -40.5 72 -99 SPO 1997 10 02 15 18 268 4.2 -9 687.90 -40.4 -40.4 -40.5 71 -99 SPO 1997 10 02 15 19 267 4.4 -9 687.90 -40.4 -40.4 -40.4 72 -99 SPO 1997 10 02 15 20 270 4.5 -9 687.90 -40.4 -40.3 -40.4 72 -99 SPO 1997 10 02 15 21 268 4.8 -9 687.90 -40.4 -40.3 -40.4 72 -99 SPO 1997 10 02 15 22 267 5.4 -9 687.90 -40.3 -40.4 -40.4 71 -99 SPO 1997 10 02 15 23 268 5.1 -9 687.90 -40.3 -40.5 -40.4 72 -99 SPO 1997 10 02 15 24 267 4.7 -9 687.90 -40.4 -40.6 -40.4 72 -99 SPO 1997 10 02 15 25 267 4.5 -9 687.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 10 02 15 26 268 4.3 -9 687.90 -40.5 -40.6 -40.6 72 -99 SPO 1997 10 02 15 27 269 4.1 -9 687.90 -40.5 -40.7 -40.6 72 -99 SPO 1997 10 02 15 28 268 4.2 -9 687.90 -40.6 -40.7 -40.6 73 -99 SPO 1997 10 02 15 29 269 4.1 -9 687.90 -40.5 -40.7 -40.6 73 -99 SPO 1997 10 02 15 30 269 4.4 -9 687.90 -40.6 -40.7 -40.6 74 -99 SPO 1997 10 02 15 31 271 4.2 -9 687.90 -40.6 -40.7 -40.6 74 -99 SPO 1997 10 02 15 32 270 4.1 -9 687.80 -40.6 -40.7 -40.7 74 -99 SPO 1997 10 02 15 33 271 4.3 -9 687.80 -40.6 -40.7 -40.7 73 -99 SPO 1997 10 02 15 34 270 4.5 -9 687.80 -40.7 -40.7 -40.7 74 -99 SPO 1997 10 02 15 35 269 4.5 -9 687.80 -40.7 -40.8 -40.7 73 -99 SPO 1997 10 02 15 36 270 4.6 -9 687.80 -40.6 -40.8 -40.7 72 -99 SPO 1997 10 02 15 37 268 4.2 -9 687.80 -40.6 -40.8 -40.7 71 -99 SPO 1997 10 02 15 38 268 4.5 -9 687.80 -40.7 -40.8 -40.7 71 -99 SPO 1997 10 02 15 39 269 4.1 -9 687.80 -40.7 -40.8 -40.7 71 -99 SPO 1997 10 02 15 40 270 3.9 -9 687.80 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 41 269 4.1 -9 687.80 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 42 267 4.3 -9 687.80 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 43 265 4.6 -9 687.80 -40.7 -40.9 -40.8 71 -99 SPO 1997 10 02 15 44 267 4.8 -9 687.80 -40.8 -40.9 -40.8 74 -99 SPO 1997 10 02 15 45 267 4.8 -9 687.70 -40.8 -40.9 -40.8 72 -99 SPO 1997 10 02 15 46 267 4.6 -9 687.70 -40.8 -40.9 -40.8 72 -99 SPO 1997 10 02 15 47 269 4.8 -9 687.70 -40.8 -40.9 -40.8 71 -99 SPO 1997 10 02 15 48 267 5.2 -9 687.70 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 15 49 268 5.2 -9 687.70 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 15 50 268 5.2 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 51 266 5.0 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 52 267 5.0 -9 687.70 -40.8 -40.8 -40.8 71 -99 SPO 1997 10 02 15 53 267 5.0 -9 687.70 -40.8 -40.8 -40.8 71 -99 SPO 1997 10 02 15 54 267 5.3 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 55 267 5.2 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 56 268 5.2 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 15 57 268 5.3 -9 687.70 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 15 58 268 5.1 -9 687.70 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 15 59 269 5.0 -9 687.70 -40.8 -40.9 -40.8 72 -99 SPO 1997 10 02 16 00 269 4.9 -9 687.70 -40.8 -40.9 -40.8 72 0 SPO 1997 10 02 16 01 269 4.8 -9 687.70 -40.8 -40.8 -40.9 71 -99 SPO 1997 10 02 16 02 269 4.8 -9 687.70 -40.8 -40.8 -40.8 71 -99 SPO 1997 10 02 16 03 268 4.9 -9 687.70 -40.8 -40.9 -40.8 72 -99 SPO 1997 10 02 16 04 266 5.0 -9 687.70 -40.8 -40.9 -40.8 74 -99 SPO 1997 10 02 16 05 267 4.9 -9 687.70 -40.8 -40.8 -40.8 74 -99 SPO 1997 10 02 16 06 267 4.8 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 16 07 265 4.8 -9 687.70 -40.7 -40.8 -40.8 71 -99 SPO 1997 10 02 16 08 264 5.3 -9 687.70 -40.7 -40.6 -40.7 71 -99 SPO 1997 10 02 16 09 264 5.5 -9 687.70 -40.6 -40.6 -40.6 71 -99 SPO 1997 10 02 16 10 264 5.5 -9 687.70 -40.5 -40.6 -40.6 70 -99 SPO 1997 10 02 16 11 264 5.6 -9 687.70 -40.5 -40.5 -40.5 72 -99 SPO 1997 10 02 16 12 263 5.2 -9 687.80 -40.5 -40.5 -40.5 73 -99 SPO 1997 10 02 16 13 262 5.5 -9 687.80 -40.4 -40.4 -40.4 73 -99 SPO 1997 10 02 16 14 262 5.4 -9 687.80 -40.4 -40.4 -40.4 73 -99 SPO 1997 10 02 16 15 261 5.8 -9 687.70 -40.3 -40.3 -40.4 73 -99 SPO 1997 10 02 16 16 262 5.9 -9 687.70 -40.3 -40.2 -40.3 73 -99 SPO 1997 10 02 16 17 262 5.8 -9 687.70 -40.2 -40.1 -40.3 72 -99 SPO 1997 10 02 16 18 262 5.7 -9 687.70 -40.2 -40.1 -40.3 73 -99 SPO 1997 10 02 16 19 263 5.6 -9 687.70 -40.2 -40.0 -40.2 74 -99 SPO 1997 10 02 16 20 264 5.7 -9 687.70 -40.1 -40.0 -40.1 72 -99 SPO 1997 10 02 16 21 264 5.5 -9 687.70 -40.1 -40.0 -40.1 72 -99 SPO 1997 10 02 16 22 265 5.4 -9 687.70 -40.0 -40.0 -40.1 71 -99 SPO 1997 10 02 16 23 264 5.0 -9 687.70 -40.0 -40.1 -40.1 71 -99 SPO 1997 10 02 16 24 265 4.9 -9 687.70 -40.0 -40.1 -40.1 71 -99 SPO 1997 10 02 16 25 263 5.2 -9 687.70 -40.0 -40.1 -40.0 72 -99 SPO 1997 10 02 16 26 262 5.6 -9 687.70 -40.0 -40.1 -40.0 73 -99 SPO 1997 10 02 16 27 262 5.8 -9 687.60 -40.0 -40.0 -40.0 73 -99 SPO 1997 10 02 16 28 263 6.1 -9 687.60 -39.9 -40.0 -40.0 72 -99 SPO 1997 10 02 16 29 262 6.2 -9 687.60 -39.9 -39.9 -40.0 73 -99 SPO 1997 10 02 16 30 262 6.3 -9 687.60 -39.9 -39.9 -40.0 73 -99 SPO 1997 10 02 16 31 262 6.5 -9 687.60 -39.9 -39.9 -40.0 73 -99 SPO 1997 10 02 16 32 260 6.5 -9 687.60 -39.9 -39.8 -39.9 74 -99 SPO 1997 10 02 16 33 261 6.8 -9 687.60 -39.8 -39.8 -39.9 73 -99 SPO 1997 10 02 16 34 261 6.7 -9 687.60 -39.8 -39.7 -39.8 73 -99 SPO 1997 10 02 16 35 261 6.9 -9 687.60 -39.8 -39.7 -39.8 73 -99 SPO 1997 10 02 16 36 261 6.8 -9 687.60 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 02 16 37 261 6.5 -9 687.60 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 02 16 38 262 6.4 -9 687.60 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 02 16 39 261 5.9 -9 687.60 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 02 16 40 262 6.1 -9 687.60 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 02 16 41 262 6.2 -9 687.60 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 02 16 42 261 6.0 -9 687.60 -39.8 -39.8 -39.8 73 -99 SPO 1997 10 02 16 43 260 5.7 -9 687.70 -39.8 -39.9 -39.9 74 -99 SPO 1997 10 02 16 44 261 6.1 -9 687.70 -39.8 -39.9 -39.9 74 -99 SPO 1997 10 02 16 45 260 6.1 -9 687.70 -39.8 -39.9 -39.9 74 -99 SPO 1997 10 02 16 46 260 6.1 -9 687.70 -39.8 -39.9 -39.9 73 -99 SPO 1997 10 02 16 47 261 5.8 -9 687.70 -39.8 -39.9 -39.9 73 -99 SPO 1997 10 02 16 48 261 5.3 -9 687.70 -39.9 -39.9 -39.9 74 -99 SPO 1997 10 02 16 49 260 5.0 -9 687.70 -39.9 -40.0 -40.0 73 -99 SPO 1997 10 02 16 50 261 5.0 -9 687.70 -40.0 -40.0 -40.0 74 -99 SPO 1997 10 02 16 51 260 5.0 -9 687.70 -40.0 -40.0 -40.0 73 -99 SPO 1997 10 02 16 52 261 4.6 -9 687.70 -40.0 -40.0 -40.0 71 -99 SPO 1997 10 02 16 53 261 4.5 -9 687.70 -40.0 -40.0 -40.1 71 -99 SPO 1997 10 02 16 54 262 4.5 -9 687.70 -40.0 -40.0 -40.1 71 -99 SPO 1997 10 02 16 55 263 4.3 -9 687.70 -40.1 -40.0 -40.1 72 -99 SPO 1997 10 02 16 56 263 4.1 -9 687.70 -40.1 -40.0 -40.2 73 -99 SPO 1997 10 02 16 57 264 4.0 -9 687.70 -40.1 -40.1 -40.2 73 -99 SPO 1997 10 02 16 58 264 4.0 -9 687.70 -40.2 -40.1 -40.2 73 -99 SPO 1997 10 02 16 59 262 4.0 -9 687.70 -40.2 -40.1 -40.3 72 -99 SPO 1997 10 02 17 00 262 4.5 -9 687.70 -40.2 -40.1 -40.3 71 0 SPO 1997 10 02 17 01 263 4.5 -9 687.70 -40.2 -40.2 -40.3 71 -99 SPO 1997 10 02 17 02 261 4.8 -9 687.70 -40.2 -40.3 -40.3 71 -99 SPO 1997 10 02 17 03 260 4.9 -9 687.70 -40.3 -40.4 -40.4 72 -99 SPO 1997 10 02 17 04 260 5.0 -9 687.70 -40.4 -40.5 -40.4 74 -99 SPO 1997 10 02 17 05 259 5.3 -9 687.70 -40.4 -40.6 -40.5 74 -99 SPO 1997 10 02 17 06 259 5.6 -9 687.80 -40.5 -40.6 -40.6 74 -99 SPO 1997 10 02 17 07 259 5.3 -9 687.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 10 02 17 08 259 5.4 -9 687.80 -40.6 -40.6 -40.6 73 -99 SPO 1997 10 02 17 09 259 5.2 -9 687.80 -40.6 -40.7 -40.7 72 -99 SPO 1997 10 02 17 10 258 5.1 -9 687.80 -40.6 -40.7 -40.7 72 -99 SPO 1997 10 02 17 11 259 5.2 -9 687.80 -40.7 -40.7 -40.8 73 -99 SPO 1997 10 02 17 12 260 5.2 -9 687.80 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 17 13 260 5.2 -9 687.80 -40.8 -40.8 -40.8 72 -99 SPO 1997 10 02 17 14 260 5.3 -9 687.80 -40.8 -40.8 -40.9 72 -99 SPO 1997 10 02 17 15 260 5.2 -9 687.80 -40.8 -40.7 -40.9 72 -99 SPO 1997 10 02 17 16 260 5.2 -9 687.80 -40.8 -40.7 -40.9 71 -99 SPO 1997 10 02 17 17 259 5.2 -9 687.80 -40.9 -40.7 -41.0 72 -99 SPO 1997 10 02 17 18 260 4.9 -9 687.80 -40.9 -40.8 -40.9 72 -99 SPO 1997 10 02 17 19 260 4.9 -9 687.80 -40.9 -40.8 -41.0 72 -99 SPO 1997 10 02 17 20 261 5.0 -9 687.80 -41.0 -40.8 -41.0 73 -99 SPO 1997 10 02 17 21 261 4.9 -9 687.80 -41.0 -40.8 -41.0 71 -99 SPO 1997 10 02 17 22 261 4.6 -9 687.80 -41.0 -40.9 -41.1 71 -99 SPO 1997 10 02 17 23 261 4.4 -9 687.80 -41.0 -41.0 -41.1 71 -99 SPO 1997 10 02 17 24 262 4.2 -9 687.80 -41.1 -41.0 -41.1 71 -99 SPO 1997 10 02 17 25 263 4.0 -9 687.80 -41.1 -41.1 -41.2 72 -99 SPO 1997 10 02 17 26 262 4.1 -9 687.80 -41.2 -41.1 -41.2 73 -99 SPO 1997 10 02 17 27 261 4.1 -9 687.80 -41.2 -41.1 -41.2 73 -99 SPO 1997 10 02 17 28 262 4.0 -9 687.80 -41.2 -41.2 -41.3 72 -99 SPO 1997 10 02 17 29 263 4.0 -9 687.80 -41.2 -41.2 -41.3 72 -99 SPO 1997 10 02 17 30 264 3.9 -9 687.80 -41.3 -41.2 -41.4 72 -99 SPO 1997 10 02 17 31 265 3.9 -9 687.80 -41.4 -41.3 -41.4 73 -99 SPO 1997 10 02 17 32 264 3.8 -9 687.80 -41.4 -41.3 -41.4 72 -99 SPO 1997 10 02 17 33 264 3.9 -9 687.80 -41.4 -41.3 -41.4 72 -99 SPO 1997 10 02 17 34 265 3.9 -9 687.80 -41.4 -41.3 -41.4 72 -99 SPO 1997 10 02 17 35 266 3.9 -9 687.80 -41.4 -41.3 -41.5 72 -99 SPO 1997 10 02 17 36 266 3.9 -9 687.80 -41.5 -41.3 -41.5 71 -99 SPO 1997 10 02 17 37 266 3.8 -9 687.80 -41.5 -41.3 -41.5 70 -99 SPO 1997 10 02 17 38 266 3.8 -9 687.80 -41.5 -41.3 -41.5 70 -99 SPO 1997 10 02 17 39 267 3.7 -9 687.80 -41.6 -41.3 -41.6 71 -99 SPO 1997 10 02 17 40 268 3.6 -9 687.80 -41.5 -41.3 -41.6 71 -99 SPO 1997 10 02 17 41 268 3.3 -9 687.80 -41.5 -41.3 -41.6 71 -99 SPO 1997 10 02 17 42 267 3.4 -9 687.80 -41.6 -41.3 -41.6 72 -99 SPO 1997 10 02 17 43 266 3.4 -9 687.80 -41.5 -41.4 -41.5 72 -99 SPO 1997 10 02 17 44 266 3.2 -9 687.80 -41.5 -41.4 -41.5 72 -99 SPO 1997 10 02 17 45 267 2.9 -9 687.80 -41.6 -41.4 -41.6 73 -99 SPO 1997 10 02 17 46 267 2.9 -9 687.80 -41.6 -41.5 -41.6 73 -99 SPO 1997 10 02 17 47 265 2.9 -9 687.90 -41.6 -41.5 -41.7 73 -99 SPO 1997 10 02 17 48 265 2.9 -9 687.90 -41.7 -41.5 -41.7 73 -99 SPO 1997 10 02 17 49 266 2.9 -9 687.90 -41.7 -41.4 -41.7 72 -99 SPO 1997 10 02 17 50 266 2.9 -9 687.90 -41.7 -41.4 -41.7 72 -99 SPO 1997 10 02 17 51 269 2.9 -9 687.80 -41.7 -41.4 -41.7 71 -99 SPO 1997 10 02 17 52 269 2.9 -9 687.80 -41.7 -41.4 -41.7 71 -99 SPO 1997 10 02 17 53 270 2.8 -9 687.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 10 02 17 54 270 2.9 -9 687.80 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 17 55 270 2.8 -9 687.80 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 17 56 270 2.8 -9 687.80 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 17 57 272 2.7 -9 687.90 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 17 58 272 2.7 -9 687.90 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 17 59 274 2.7 -9 687.90 -41.8 -41.5 -41.8 72 -99 SPO 1997 10 02 18 00 275 2.7 -9 687.90 -41.8 -41.5 -41.9 72 0 SPO 1997 10 02 18 01 277 2.5 -9 687.80 -41.9 -41.5 -41.9 72 -99 SPO 1997 10 02 18 02 278 2.4 -9 687.90 -42.0 -41.5 -41.9 73 -99 SPO 1997 10 02 18 03 281 2.3 -9 687.90 -42.0 -41.6 -41.9 73 -99 SPO 1997 10 02 18 04 283 2.3 -9 687.90 -42.0 -41.6 -42.0 74 -99 SPO 1997 10 02 18 05 283 2.4 -9 687.80 -42.0 -41.6 -42.0 73 -99 SPO 1997 10 02 18 06 285 2.4 -9 687.80 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 07 286 2.5 -9 687.90 -42.0 -41.5 -41.9 73 -99 SPO 1997 10 02 18 08 288 2.4 -9 687.90 -42.0 -41.4 -41.9 73 -99 SPO 1997 10 02 18 09 288 2.5 -9 687.80 -42.0 -41.5 -41.9 73 -99 SPO 1997 10 02 18 10 287 2.5 -9 687.90 -42.0 -41.5 -41.9 73 -99 SPO 1997 10 02 18 11 287 2.5 -9 687.80 -42.0 -41.5 -41.9 74 -99 SPO 1997 10 02 18 12 287 2.6 -9 687.80 -42.0 -41.5 -41.9 74 -99 SPO 1997 10 02 18 13 286 2.5 -9 687.80 -42.0 -41.5 -42.0 74 -99 SPO 1997 10 02 18 14 286 2.6 -9 687.90 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 15 286 2.7 -9 687.80 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 16 287 2.5 -9 687.80 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 17 286 2.4 -9 687.80 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 18 286 2.5 -9 687.90 -42.0 -41.4 -42.0 73 -99 SPO 1997 10 02 18 19 288 2.4 -9 687.90 -42.0 -41.5 -42.0 73 -99 SPO 1997 10 02 18 20 289 2.4 -9 687.90 -42.0 -41.4 -42.0 73 -99 SPO 1997 10 02 18 21 288 2.6 -9 687.90 -42.1 -41.4 -42.0 73 -99 SPO 1997 10 02 18 22 288 2.6 -9 687.90 -42.1 -41.5 -42.0 74 -99 SPO 1997 10 02 18 23 289 2.6 -9 687.90 -42.1 -41.6 -42.0 73 -99 SPO 1997 10 02 18 24 289 2.7 -9 687.90 -42.1 -41.6 -42.0 73 -99 SPO 1997 10 02 18 25 289 2.7 -9 687.80 -42.0 -41.6 -42.0 73 -99 SPO 1997 10 02 18 26 290 2.7 -9 687.80 -42.0 -41.6 -42.0 73 -99 SPO 1997 10 02 18 27 294 2.5 -9 687.80 -42.1 -41.6 -42.0 74 -99 SPO 1997 10 02 18 28 297 2.5 -9 687.80 -42.1 -41.6 -42.1 74 -99 SPO 1997 10 02 18 29 294 2.6 -9 687.80 -42.2 -41.6 -42.1 75 -99 SPO 1997 10 02 18 30 293 2.6 -9 687.80 -42.2 -41.6 -42.1 75 -99 SPO 1997 10 02 18 31 294 2.8 -9 687.80 -42.2 -41.6 -42.1 74 -99 SPO 1997 10 02 18 32 294 2.9 -9 687.80 -42.2 -41.6 -42.1 73 -99 SPO 1997 10 02 18 33 293 2.9 -9 687.80 -42.2 -41.5 -42.1 73 -99 SPO 1997 10 02 18 34 296 2.8 -9 687.80 -42.2 -41.5 -42.2 73 -99 SPO 1997 10 02 18 35 297 2.9 -9 687.80 -42.3 -41.5 -42.2 74 -99 SPO 1997 10 02 18 36 296 2.9 -9 687.80 -42.3 -41.5 -42.2 73 -99 SPO 1997 10 02 18 37 294 2.9 -9 687.80 -42.2 -41.5 -42.2 73 -99 SPO 1997 10 02 18 38 294 2.8 -9 687.80 -42.3 -41.5 -42.2 73 -99 SPO 1997 10 02 18 39 296 2.8 -9 687.80 -42.3 -41.5 -42.2 73 -99 SPO 1997 10 02 18 40 297 2.9 -9 687.80 -42.3 -41.5 -42.3 72 -99 SPO 1997 10 02 18 41 294 3.0 -9 687.80 -42.3 -41.5 -42.3 72 -99 SPO 1997 10 02 18 42 292 3.0 -9 687.90 -42.4 -41.6 -42.3 73 -99 SPO 1997 10 02 18 43 292 2.9 -9 687.90 -42.4 -41.6 -42.3 74 -99 SPO 1997 10 02 18 44 293 3.0 -9 687.90 -42.4 -41.6 -42.3 74 -99 SPO 1997 10 02 18 45 292 3.0 -9 687.90 -42.4 -41.6 -42.4 74 -99 SPO 1997 10 02 18 46 292 3.1 -9 687.80 -42.4 -41.6 -42.3 73 -99 SPO 1997 10 02 18 47 293 3.1 -9 687.80 -42.4 -41.6 -42.3 73 -99 SPO 1997 10 02 18 48 294 3.0 -9 687.80 -42.3 -41.6 -42.3 73 -99 SPO 1997 10 02 18 49 295 3.0 -9 687.80 -42.4 -41.6 -42.3 75 -99 SPO 1997 10 02 18 50 296 3.1 -9 687.80 -42.4 -41.6 -42.3 75 -99 SPO 1997 10 02 18 51 296 3.1 -9 687.80 -42.4 -41.5 -42.3 74 -99 SPO 1997 10 02 18 52 296 3.1 -9 687.80 -42.3 -41.5 -42.3 73 -99 SPO 1997 10 02 18 53 296 3.2 -9 687.80 -42.3 -41.5 -42.3 73 -99 SPO 1997 10 02 18 54 297 3.3 -9 687.80 -42.3 -41.6 -42.3 73 -99 SPO 1997 10 02 18 55 297 3.3 -9 687.80 -42.3 -41.6 -42.3 73 -99 SPO 1997 10 02 18 56 297 3.4 -9 687.80 -42.3 -41.6 -42.3 73 -99 SPO 1997 10 02 18 57 297 3.4 -9 687.80 -42.3 -41.5 -42.3 73 -99 SPO 1997 10 02 18 58 296 3.5 -9 687.80 -42.3 -41.5 -42.3 73 -99 SPO 1997 10 02 18 59 297 3.5 -9 687.80 -42.3 -41.5 -42.2 73 -99 SPO 1997 10 02 19 00 298 3.4 -9 687.80 -42.2 -41.5 -42.2 72 0 SPO 1997 10 02 19 01 299 3.3 -9 687.80 -42.2 -41.4 -42.2 72 -99 SPO 1997 10 02 19 02 300 3.2 -9 687.80 -42.2 -41.5 -42.1 73 -99 SPO 1997 10 02 19 03 301 3.1 -9 687.80 -42.1 -41.5 -42.0 73 -99 SPO 1997 10 02 19 04 302 3.0 -9 687.80 -42.0 -41.4 -42.0 73 -99 SPO 1997 10 02 19 05 304 3.1 -9 687.80 -42.0 -41.4 -42.0 73 -99 SPO 1997 10 02 19 06 302 3.0 -9 687.80 -42.0 -41.4 -42.0 74 -99 SPO 1997 10 02 19 07 303 2.9 -9 687.80 -41.9 -41.4 -41.9 74 -99 SPO 1997 10 02 19 08 303 2.7 -9 687.80 -41.9 -41.4 -41.9 74 -99 SPO 1997 10 02 19 09 303 2.8 -9 687.80 -41.8 -41.4 -41.8 74 -99 SPO 1997 10 02 19 10 306 2.7 -9 687.80 -41.8 -41.4 -41.8 74 -99 SPO 1997 10 02 19 11 306 2.8 -9 687.80 -41.8 -41.3 -41.8 74 -99 SPO 1997 10 02 19 12 306 2.9 -9 687.80 -41.8 -41.2 -41.7 73 -99 SPO 1997 10 02 19 13 308 2.8 -9 687.80 -41.7 -41.2 -41.7 73 -99 SPO 1997 10 02 19 14 307 2.9 -9 687.80 -41.7 -41.2 -41.7 73 -99 SPO 1997 10 02 19 15 307 2.9 -9 687.80 -41.6 -41.2 -41.6 73 -99 SPO 1997 10 02 19 16 306 3.0 -9 687.80 -41.6 -41.1 -41.6 73 -99 SPO 1997 10 02 19 17 306 2.9 -9 687.70 -41.6 -41.1 -41.6 74 -99 SPO 1997 10 02 19 18 304 3.1 -9 687.70 -41.6 -41.0 -41.6 74 -99 SPO 1997 10 02 19 19 306 3.1 -9 687.70 -41.5 -41.0 -41.5 73 -99 SPO 1997 10 02 19 20 303 3.0 -9 687.70 -41.5 -41.0 -41.5 73 -99 SPO 1997 10 02 19 21 303 3.0 -9 687.70 -41.5 -41.1 -41.4 74 -99 SPO 1997 10 02 19 22 303 2.8 -9 687.80 -41.4 -41.1 -41.4 75 -99 SPO 1997 10 02 19 23 303 2.7 -9 687.70 -41.4 -41.2 -41.4 75 -99 SPO 1997 10 02 19 24 307 2.7 -9 687.80 -41.4 -41.1 -41.4 74 -99 SPO 1997 10 02 19 25 309 2.8 -9 687.80 -41.4 -41.2 -41.4 73 -99 SPO 1997 10 02 19 26 307 2.5 -9 687.80 -41.4 -41.2 -41.4 73 -99 SPO 1997 10 02 19 27 308 2.7 -9 687.80 -41.4 -41.3 -41.4 73 -99 SPO 1997 10 02 19 28 307 2.6 -9 687.80 -41.4 -41.3 -41.4 73 -99 SPO 1997 10 02 19 29 308 2.6 -9 687.80 -41.4 -41.3 -41.4 73 -99 SPO 1997 10 02 19 30 310 2.7 -9 687.80 -41.5 -41.2 -41.5 75 -99 SPO 1997 10 02 19 31 310 2.8 -9 687.80 -41.5 -41.3 -41.5 75 -99 SPO 1997 10 02 19 32 306 2.7 -9 687.80 -41.6 -41.3 -41.5 76 -99 SPO 1997 10 02 19 33 307 2.5 -9 687.80 -41.6 -41.3 -41.5 75 -99 SPO 1997 10 02 19 34 306 2.7 -9 687.80 -41.6 -41.3 -41.6 75 -99 SPO 1997 10 02 19 35 308 2.9 -9 687.80 -41.6 -41.2 -41.6 75 -99 SPO 1997 10 02 19 36 308 2.9 -9 687.80 -41.6 -41.2 -41.5 74 -99 SPO 1997 10 02 19 37 311 2.7 -9 687.80 -41.6 -41.2 -41.5 73 -99 SPO 1997 10 02 19 38 314 2.7 -9 687.80 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 39 318 2.6 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 40 321 2.5 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 41 323 2.5 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 42 325 2.6 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 43 325 2.6 -9 687.90 -41.6 -41.3 -41.6 72 -99 SPO 1997 10 02 19 44 325 2.6 -9 687.90 -41.7 -41.2 -41.6 73 -99 SPO 1997 10 02 19 45 324 2.5 -9 687.90 -41.7 -41.2 -41.6 73 -99 SPO 1997 10 02 19 46 323 2.6 -9 687.90 -41.7 -41.1 -41.6 73 -99 SPO 1997 10 02 19 47 323 2.6 -9 687.90 -41.7 -41.2 -41.6 73 -99 SPO 1997 10 02 19 48 320 2.8 -9 687.80 -41.7 -41.3 -41.6 73 -99 SPO 1997 10 02 19 49 318 3.0 -9 687.80 -41.7 -41.4 -41.6 73 -99 SPO 1997 10 02 19 50 315 3.1 -9 687.80 -41.6 -41.4 -41.6 73 -99 SPO 1997 10 02 19 51 313 3.2 -9 687.80 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 52 314 3.2 -9 687.80 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 53 316 3.1 -9 687.80 -41.6 -41.2 -41.5 73 -99 SPO 1997 10 02 19 54 317 2.9 -9 687.80 -41.6 -41.2 -41.5 74 -99 SPO 1997 10 02 19 55 319 3.0 -9 687.90 -41.5 -41.2 -41.5 73 -99 SPO 1997 10 02 19 56 324 2.9 -9 687.80 -41.6 -41.2 -41.5 74 -99 SPO 1997 10 02 19 57 327 3.0 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 58 327 2.9 -9 687.90 -41.6 -41.3 -41.5 73 -99 SPO 1997 10 02 19 59 328 2.9 -9 687.90 -41.5 -41.3 -41.5 71 -99 SPO 1997 10 02 20 00 326 3.0 -9 687.90 -41.6 -41.3 -41.5 71 0 SPO 1997 10 02 20 01 325 3.1 -9 687.90 -41.6 -41.2 -41.5 72 -99 SPO 1997 10 02 20 02 324 3.2 -9 687.90 -41.6 -41.0 -41.5 72 -99 SPO 1997 10 02 20 03 321 3.1 -9 687.90 -41.6 -41.1 -41.5 72 -99 SPO 1997 10 02 20 04 318 3.2 -9 687.90 -41.6 -41.0 -41.5 73 -99 SPO 1997 10 02 20 05 316 3.1 -9 687.90 -41.6 -40.9 -41.5 73 -99 SPO 1997 10 02 20 06 312 3.2 -9 687.90 -41.5 -40.8 -41.4 73 -99 SPO 1997 10 02 20 07 312 3.4 -9 687.90 -41.5 -40.8 -41.5 74 -99 SPO 1997 10 02 20 08 314 3.3 -9 687.90 -41.5 -40.9 -41.5 74 -99 SPO 1997 10 02 20 09 315 3.2 -9 687.90 -41.5 -40.9 -41.5 74 -99 SPO 1997 10 02 20 10 315 3.0 -9 687.90 -41.5 -40.9 -41.4 73 -99 SPO 1997 10 02 20 11 314 3.1 -9 687.90 -41.5 -40.8 -41.4 73 -99 SPO 1997 10 02 20 12 313 3.1 -9 687.90 -41.5 -40.9 -41.4 73 -99 SPO 1997 10 02 20 13 313 3.1 -9 687.90 -41.5 -40.8 -41.4 73 -99 SPO 1997 10 02 20 14 313 3.0 -9 687.90 -41.4 -40.8 -41.4 73 -99 SPO 1997 10 02 20 15 315 2.9 -9 687.90 -41.4 -40.8 -41.4 73 -99 SPO 1997 10 02 20 16 313 3.0 -9 687.90 -41.4 -40.8 -41.4 73 -99 SPO 1997 10 02 20 17 312 2.8 -9 687.90 -41.4 -40.7 -41.4 73 -99 SPO 1997 10 02 20 18 314 2.6 -9 687.90 -41.4 -40.7 -41.3 74 -99 SPO 1997 10 02 20 19 314 2.7 -9 687.90 -41.3 -40.6 -41.3 74 -99 SPO 1997 10 02 20 20 312 2.5 -9 687.90 -41.3 -40.8 -41.3 74 -99 SPO 1997 10 02 20 21 311 2.5 -9 687.90 -41.3 -40.8 -41.3 74 -99 SPO 1997 10 02 20 22 311 2.6 -9 687.90 -41.3 -40.8 -41.2 74 -99 SPO 1997 10 02 20 23 311 2.6 -9 687.90 -41.3 -40.9 -41.2 74 -99 SPO 1997 10 02 20 24 312 2.5 -9 687.90 -41.3 -40.8 -41.2 74 -99 SPO 1997 10 02 20 25 309 2.5 -9 687.90 -41.3 -40.9 -41.2 74 -99 SPO 1997 10 02 20 26 311 2.5 -9 687.90 -41.2 -40.8 -41.2 74 -99 SPO 1997 10 02 20 27 309 2.6 -9 687.90 -41.2 -40.8 -41.2 73 -99 SPO 1997 10 02 20 28 313 2.6 -9 687.90 -41.2 -40.9 -41.2 73 -99 SPO 1997 10 02 20 29 312 2.7 -9 687.90 -41.2 -40.9 -41.1 73 -99 SPO 1997 10 02 20 30 315 2.7 -9 687.90 -41.2 -41.0 -41.2 74 -99 SPO 1997 10 02 20 31 316 2.8 -9 687.90 -41.2 -40.9 -41.2 74 -99 SPO 1997 10 02 20 32 316 2.8 -9 688.00 -41.2 -41.0 -41.2 74 -99 SPO 1997 10 02 20 33 316 2.8 -9 688.00 -41.2 -41.0 -41.2 74 -99 SPO 1997 10 02 20 34 316 2.8 -9 688.00 -41.2 -41.0 -41.2 74 -99 SPO 1997 10 02 20 35 319 2.7 -9 688.00 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 36 318 2.7 -9 688.00 -41.2 -41.0 -41.1 74 -99 SPO 1997 10 02 20 37 316 2.8 -9 688.00 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 38 315 2.9 -9 687.90 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 39 314 3.0 -9 687.90 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 40 310 3.1 -9 687.90 -41.1 -40.9 -41.1 74 -99 SPO 1997 10 02 20 41 310 3.1 -9 687.90 -41.1 -41.0 -41.1 74 -99 SPO 1997 10 02 20 42 309 3.1 -9 687.90 -41.1 -41.0 -41.1 74 -99 SPO 1997 10 02 20 43 309 3.2 -9 687.90 -41.1 -41.0 -41.1 74 -99 SPO 1997 10 02 20 44 312 3.2 -9 687.90 -41.1 -41.0 -41.1 73 -99 SPO 1997 10 02 20 45 314 3.0 -9 687.90 -41.1 -41.0 -41.1 73 -99 SPO 1997 10 02 20 46 316 3.1 -9 687.90 -41.1 -41.0 -41.1 73 -99 SPO 1997 10 02 20 47 316 3.3 -9 687.90 -41.1 -41.0 -41.1 74 -99 SPO 1997 10 02 20 48 316 3.3 -9 687.90 -41.1 -41.0 -41.1 74 -99 SPO 1997 10 02 20 49 316 3.4 -9 687.90 -41.2 -41.0 -41.1 74 -99 SPO 1997 10 02 20 50 316 3.2 -9 687.90 -41.2 -41.0 -41.1 74 -99 SPO 1997 10 02 20 51 317 3.2 -9 687.90 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 52 317 3.3 -9 687.90 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 53 315 3.3 -9 687.90 -41.2 -40.9 -41.1 74 -99 SPO 1997 10 02 20 54 315 3.3 -9 687.90 -41.2 -40.9 -41.2 74 -99 SPO 1997 10 02 20 55 315 3.3 -9 687.90 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 20 56 315 3.4 -9 687.80 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 20 57 316 3.5 -9 687.80 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 20 58 317 3.4 -9 687.80 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 20 59 319 3.3 -9 687.80 -41.2 -40.8 -41.1 72 -99 SPO 1997 10 02 21 00 322 3.4 -9 687.70 -41.2 -40.8 -41.1 72 0 SPO 1997 10 02 21 01 320 3.4 -9 687.80 -41.2 -40.8 -41.1 73 -99 SPO 1997 10 02 21 02 321 3.4 -9 687.70 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 21 03 321 3.5 -9 687.70 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 21 04 321 3.5 -9 687.70 -41.2 -40.8 -41.1 74 -99 SPO 1997 10 02 21 05 322 3.4 -9 687.70 -41.2 -40.9 -41.1 73 -99 SPO 1997 10 02 21 06 322 3.5 -9 687.80 -41.2 -40.9 -41.1 73 -99 SPO 1997 10 02 21 07 320 3.4 -9 687.80 -41.2 -40.9 -41.2 73 -99 SPO 1997 10 02 21 08 317 3.3 -9 687.80 -41.2 -40.9 -41.2 73 -99 SPO 1997 10 02 21 09 315 3.3 -9 687.90 -41.3 -41.0 -41.2 74 -99 SPO 1997 10 02 21 10 315 3.2 -9 687.90 -41.3 -40.9 -41.3 74 -99 SPO 1997 10 02 21 11 315 3.4 -9 687.90 -41.3 -40.9 -41.3 74 -99 SPO 1997 10 02 21 12 314 3.4 -9 687.90 -41.4 -40.9 -41.3 74 -99 SPO 1997 10 02 21 13 314 3.5 -9 687.90 -41.4 -40.9 -41.3 74 -99 SPO 1997 10 02 21 14 313 3.4 -9 687.90 -41.4 -40.9 -41.3 73 -99 SPO 1997 10 02 21 15 312 3.4 -9 687.90 -41.4 -40.9 -41.4 73 -99 SPO 1997 10 02 21 16 313 3.5 -9 687.90 -41.4 -40.9 -41.4 72 -99 SPO 1997 10 02 21 17 312 3.5 -9 687.90 -41.5 -40.9 -41.4 72 -99 SPO 1997 10 02 21 18 313 3.5 -9 687.90 -41.4 -40.9 -41.4 71 -99 SPO 1997 10 02 21 19 313 3.6 -9 687.90 -41.5 -40.8 -41.4 73 -99 SPO 1997 10 02 21 20 313 3.5 -9 687.90 -41.6 -40.9 -41.5 73 -99 SPO 1997 10 02 21 21 313 3.6 -9 687.90 -41.5 -40.9 -41.5 74 -99 SPO 1997 10 02 21 22 314 3.6 -9 687.80 -41.4 -40.9 -41.6 74 -99 SPO 1997 10 02 21 23 313 3.6 -9 687.80 -41.7 -40.9 -41.6 76 -99 SPO 1997 10 02 21 24 313 3.6 -9 687.80 -41.8 -40.8 -41.6 76 -99 SPO 1997 10 02 21 25 313 3.8 -9 687.80 -41.8 -40.8 -41.6 75 -99 SPO 1997 10 02 21 26 312 3.8 -9 687.80 -41.8 -40.8 -41.7 74 -99 SPO 1997 10 02 21 27 311 3.9 -9 687.80 -41.9 -40.8 -41.7 74 -99 SPO 1997 10 02 21 28 309 3.9 -9 687.80 -41.9 -40.8 -41.8 74 -99 SPO 1997 10 02 21 29 309 3.9 -9 687.80 -42.0 -40.8 -41.8 73 -99 SPO 1997 10 02 21 30 307 3.8 -9 687.80 -42.0 -40.8 -41.8 72 -99 SPO 1997 10 02 21 31 308 3.8 -9 687.80 -42.0 -40.8 -41.8 71 -99 SPO 1997 10 02 21 32 305 3.8 -9 687.80 -42.0 -40.8 -41.9 71 -99 SPO 1997 10 02 21 33 306 3.9 -9 687.80 -42.0 -40.7 -41.9 72 -99 SPO 1997 10 02 21 34 305 4.0 -9 687.80 -42.0 -40.7 -41.9 72 -99 SPO 1997 10 02 21 35 304 4.0 -9 687.80 -42.0 -40.6 -41.9 73 -99 SPO 1997 10 02 21 36 304 4.0 -9 687.80 -42.0 -40.6 -42.0 73 -99 SPO 1997 10 02 21 37 305 4.0 -9 687.80 -42.0 -40.6 -42.0 73 -99 SPO 1997 10 02 21 38 306 4.0 -9 687.80 -42.1 -40.6 -42.0 73 -99 SPO 1997 10 02 21 39 307 4.0 -9 687.80 -42.1 -40.6 -42.1 73 -99 SPO 1997 10 02 21 40 308 4.0 -9 687.70 -42.2 -40.6 -42.0 74 -99 SPO 1997 10 02 21 41 308 3.8 -9 687.80 -42.2 -40.7 -42.0 74 -99 SPO 1997 10 02 21 42 306 3.7 -9 687.80 -42.2 -40.7 -42.1 73 -99 SPO 1997 10 02 21 43 305 3.7 -9 687.80 -42.2 -40.8 -42.1 73 -99 SPO 1997 10 02 21 44 306 3.7 -9 687.80 -42.2 -40.8 -42.2 71 -99 SPO 1997 10 02 21 45 305 3.6 -9 687.80 -42.3 -40.8 -42.2 71 -99 SPO 1997 10 02 21 46 303 3.8 -9 687.80 -42.4 -40.8 -42.2 72 -99 SPO 1997 10 02 21 47 303 3.8 -9 687.80 -42.4 -40.9 -42.2 72 -99 SPO 1997 10 02 21 48 302 3.7 -9 687.80 -42.4 -40.9 -42.3 72 -99 SPO 1997 10 02 21 49 303 3.7 -9 687.80 -42.5 -40.9 -42.3 73 -99 SPO 1997 10 02 21 50 304 3.8 -9 687.80 -42.5 -40.9 -42.3 73 -99 SPO 1997 10 02 21 51 306 3.8 -9 687.80 -42.5 -40.9 -42.4 73 -99 SPO 1997 10 02 21 52 308 3.9 -9 687.80 -42.6 -40.9 -42.4 73 -99 SPO 1997 10 02 21 53 309 3.8 -9 687.70 -42.5 -40.9 -42.4 72 -99 SPO 1997 10 02 21 54 310 3.7 -9 687.70 -42.5 -40.9 -42.4 72 -99 SPO 1997 10 02 21 55 310 3.6 -9 687.70 -42.5 -40.9 -42.4 72 -99 SPO 1997 10 02 21 56 307 3.6 -9 687.70 -42.5 -41.0 -42.4 72 -99 SPO 1997 10 02 21 57 306 3.5 -9 687.70 -42.6 -41.0 -42.4 73 -99 SPO 1997 10 02 21 58 305 3.4 -9 687.80 -42.6 -41.0 -42.5 73 -99 SPO 1997 10 02 21 59 303 3.4 -9 687.80 -42.6 -41.0 -42.5 72 -99 SPO 1997 10 02 22 00 304 3.5 -9 687.80 -42.7 -41.2 -42.6 73 0 SPO 1997 10 02 22 01 304 3.4 -9 687.80 -42.8 -41.2 -42.6 72 -99 SPO 1997 10 02 22 02 304 3.4 -9 687.80 -42.8 -41.2 -42.6 72 -99 SPO 1997 10 02 22 03 305 3.4 -9 687.80 -42.8 -41.2 -42.7 74 -99 SPO 1997 10 02 22 04 304 3.4 -9 687.80 -42.9 -41.2 -42.7 73 -99 SPO 1997 10 02 22 05 304 3.4 -9 687.80 -42.9 -41.3 -42.8 73 -99 SPO 1997 10 02 22 06 307 3.5 -9 687.70 -42.9 -41.3 -42.8 73 -99 SPO 1997 10 02 22 07 308 3.5 -9 687.70 -43.0 -41.2 -42.8 73 -99 SPO 1997 10 02 22 08 307 3.6 -9 687.70 -43.0 -41.2 -42.8 73 -99 SPO 1997 10 02 22 09 308 3.7 -9 687.70 -43.0 -41.2 -42.8 73 -99 SPO 1997 10 02 22 10 310 3.9 -9 687.60 -43.0 -41.2 -42.8 72 -99 SPO 1997 10 02 22 11 310 4.1 -9 687.60 -42.9 -41.2 -42.8 72 -99 SPO 1997 10 02 22 12 309 4.2 -9 687.60 -42.9 -41.2 -42.8 72 -99 SPO 1997 10 02 22 13 308 4.2 -9 687.60 -42.9 -41.2 -42.8 72 -99 SPO 1997 10 02 22 14 307 4.2 -9 687.60 -42.8 -41.2 -42.8 71 -99 SPO 1997 10 02 22 15 307 4.2 -9 687.60 -42.8 -41.2 -42.7 71 -99 SPO 1997 10 02 22 16 306 4.2 -9 687.60 -42.7 -41.2 -42.7 70 -99 SPO 1997 10 02 22 17 306 4.1 -9 687.60 -42.6 -41.2 -42.6 69 -99 SPO 1997 10 02 22 18 307 4.0 -9 687.60 -42.6 -41.3 -42.6 69 -99 SPO 1997 10 02 22 19 307 4.1 -9 687.60 -42.6 -41.3 -42.6 71 -99 SPO 1997 10 02 22 20 307 3.9 -9 687.60 -42.7 -41.4 -42.6 73 -99 SPO 1997 10 02 22 21 307 4.0 -9 687.60 -42.6 -41.4 -42.6 73 -99 SPO 1997 10 02 22 22 307 4.0 -9 687.60 -42.6 -41.5 -42.6 73 -99 SPO 1997 10 02 22 23 306 4.0 -9 687.60 -42.6 -41.5 -42.6 73 -99 SPO 1997 10 02 22 24 305 3.9 -9 687.70 -42.6 -41.6 -42.6 73 -99 SPO 1997 10 02 22 25 305 3.7 -9 687.70 -42.6 -41.6 -42.6 72 -99 SPO 1997 10 02 22 26 305 3.7 -9 687.70 -42.6 -41.7 -42.6 72 -99 SPO 1997 10 02 22 27 302 3.8 -9 687.70 -42.7 -41.8 -42.6 73 -99 SPO 1997 10 02 22 28 303 3.7 -9 687.70 -42.6 -41.8 -42.6 72 -99 SPO 1997 10 02 22 29 303 3.9 -9 687.70 -42.6 -41.8 -42.6 72 -99 SPO 1997 10 02 22 30 303 3.9 -9 687.70 -42.7 -41.8 -42.6 72 -99 SPO 1997 10 02 22 31 303 3.8 -9 687.70 -42.6 -41.8 -42.6 70 -99 SPO 1997 10 02 22 32 304 3.8 -9 687.60 -42.6 -41.8 -42.6 70 -99 SPO 1997 10 02 22 33 306 3.8 -9 687.60 -42.6 -41.9 -42.6 70 -99 SPO 1997 10 02 22 34 308 3.8 -9 687.60 -42.7 -41.9 -42.6 72 -99 SPO 1997 10 02 22 35 311 3.6 -9 687.60 -42.7 -41.9 -42.6 72 -99 SPO 1997 10 02 22 36 313 3.6 -9 687.60 -42.7 -41.9 -42.7 71 -99 SPO 1997 10 02 22 37 313 3.4 -9 687.60 -42.7 -42.0 -42.7 72 -99 SPO 1997 10 02 22 38 314 3.4 -9 687.60 -42.8 -42.0 -42.7 72 -99 SPO 1997 10 02 22 39 314 3.4 -9 687.60 -42.8 -42.0 -42.7 72 -99 SPO 1997 10 02 22 40 313 3.2 -9 687.60 -42.8 -42.0 -42.7 72 -99 SPO 1997 10 02 22 41 310 3.3 -9 687.60 -42.8 -42.0 -42.7 72 -99 SPO 1997 10 02 22 42 308 3.1 -9 687.60 -42.8 -42.1 -42.7 72 -99 SPO 1997 10 02 22 43 305 3.1 -9 687.60 -42.8 -42.2 -42.7 72 -99 SPO 1997 10 02 22 44 305 3.1 -9 687.60 -42.8 -42.2 -42.7 71 -99 SPO 1997 10 02 22 45 302 3.0 -9 687.60 -42.8 -42.2 -42.7 71 -99 SPO 1997 10 02 22 46 302 3.2 -9 687.60 -42.9 -42.2 -42.8 72 -99 SPO 1997 10 02 22 47 300 3.2 -9 687.60 -42.8 -42.2 -42.8 72 -99 SPO 1997 10 02 22 48 300 3.1 -9 687.60 -42.9 -42.2 -42.8 72 -99 SPO 1997 10 02 22 49 302 3.2 -9 687.60 -42.8 -42.2 -42.8 72 -99 SPO 1997 10 02 22 50 305 3.2 -9 687.50 -42.8 -42.1 -42.8 72 -99 SPO 1997 10 02 22 51 304 3.2 -9 687.50 -42.8 -42.1 -42.8 72 -99 SPO 1997 10 02 22 52 302 3.1 -9 687.50 -42.8 -42.1 -42.8 72 -99 SPO 1997 10 02 22 53 300 3.0 -9 687.60 -42.7 -42.1 -42.7 71 -99 SPO 1997 10 02 22 54 300 3.1 -9 687.60 -42.8 -42.1 -42.7 72 -99 SPO 1997 10 02 22 55 301 3.0 -9 687.50 -42.8 -42.1 -42.7 72 -99 SPO 1997 10 02 22 56 300 2.9 -9 687.60 -42.8 -42.1 -42.7 72 -99 SPO 1997 10 02 22 57 301 2.9 -9 687.50 -42.8 -42.2 -42.7 72 -99 SPO 1997 10 02 22 58 301 3.0 -9 687.50 -42.9 -42.2 -42.8 72 -99 SPO 1997 10 02 22 59 300 3.1 -9 687.50 -42.9 -42.2 -42.8 72 -99 SPO 1997 10 02 23 00 299 3.0 -9 687.50 -42.9 -42.2 -42.8 72 0 SPO 1997 10 02 23 01 298 3.0 -9 687.50 -42.9 -42.2 -42.8 71 -99 SPO 1997 10 02 23 02 297 2.9 -9 687.50 -42.9 -42.2 -42.8 71 -99 SPO 1997 10 02 23 03 296 3.0 -9 687.50 -43.0 -42.1 -42.9 72 -99 SPO 1997 10 02 23 04 296 3.0 -9 687.50 -43.0 -42.1 -42.9 72 -99 SPO 1997 10 02 23 05 298 3.1 -9 687.50 -43.1 -42.0 -42.9 73 -99 SPO 1997 10 02 23 06 300 3.2 -9 687.40 -43.1 -42.0 -43.0 73 -99 SPO 1997 10 02 23 07 299 3.3 -9 687.40 -43.0 -42.0 -43.0 72 -99 SPO 1997 10 02 23 08 299 3.3 -9 687.40 -43.1 -42.0 -43.0 72 -99 SPO 1997 10 02 23 09 298 3.4 -9 687.40 -43.1 -42.0 -43.0 72 -99 SPO 1997 10 02 23 10 295 3.4 -9 687.40 -43.2 -42.0 -43.0 72 -99 SPO 1997 10 02 23 11 294 3.6 -9 687.40 -43.2 -42.0 -43.0 72 -99 SPO 1997 10 02 23 12 294 3.5 -9 687.40 -43.2 -41.8 -43.0 72 -99 SPO 1997 10 02 23 13 295 3.3 -9 687.40 -43.1 -41.8 -43.0 71 -99 SPO 1997 10 02 23 14 295 3.3 -9 687.40 -43.1 -41.8 -43.0 69 -99 SPO 1997 10 02 23 15 294 3.3 -9 687.40 -43.1 -41.8 -43.0 69 -99 SPO 1997 10 02 23 16 294 3.3 -9 687.40 -43.0 -41.9 -42.9 69 -99 SPO 1997 10 02 23 17 294 3.4 -9 687.40 -43.1 -41.9 -42.9 71 -99 SPO 1997 10 02 23 18 295 3.2 -9 687.40 -43.0 -41.9 -42.9 71 -99 SPO 1997 10 02 23 19 296 3.5 -9 687.40 -43.0 -41.9 -42.9 72 -99 SPO 1997 10 02 23 20 296 3.5 -9 687.40 -43.0 -41.9 -42.9 72 -99 SPO 1997 10 02 23 21 295 3.4 -9 687.40 -43.0 -41.9 -42.9 72 -99 SPO 1997 10 02 23 22 294 3.3 -9 687.40 -43.0 -41.9 -43.0 72 -99 SPO 1997 10 02 23 23 293 3.6 -9 687.40 -43.0 -41.8 -43.0 72 -99 SPO 1997 10 02 23 24 292 3.7 -9 687.40 -43.1 -41.7 -43.0 72 -99 SPO 1997 10 02 23 25 291 3.8 -9 687.40 -43.1 -41.6 -43.0 72 -99 SPO 1997 10 02 23 26 290 3.9 -9 687.40 -43.1 -41.6 -43.0 72 -99 SPO 1997 10 02 23 27 291 4.0 -9 687.40 -43.0 -41.4 -43.0 72 -99 SPO 1997 10 02 23 28 290 4.0 -9 687.40 -43.0 -41.2 -42.9 71 -99 SPO 1997 10 02 23 29 289 4.1 -9 687.40 -43.0 -41.2 -43.0 70 -99 SPO 1997 10 02 23 30 288 4.3 -9 687.40 -43.0 -41.1 -43.0 70 -99 SPO 1997 10 02 23 31 288 4.2 -9 687.40 -43.0 -41.2 -42.9 69 -99 SPO 1997 10 02 23 32 289 4.3 -9 687.40 -42.9 -41.2 -42.9 69 -99 SPO 1997 10 02 23 33 290 4.4 -9 687.40 -42.9 -41.2 -42.9 70 -99 SPO 1997 10 02 23 34 291 4.5 -9 687.40 -42.9 -41.3 -42.9 70 -99 SPO 1997 10 02 23 35 290 4.6 -9 687.30 -42.9 -41.2 -42.9 70 -99 SPO 1997 10 02 23 36 292 4.8 -9 687.30 -42.9 -41.1 -42.9 71 -99 SPO 1997 10 02 23 37 292 4.8 -9 687.20 -43.0 -41.1 -42.9 72 -99 SPO 1997 10 02 23 38 291 4.8 -9 687.20 -43.0 -40.8 -43.0 72 -99 SPO 1997 10 02 23 39 289 5.0 -9 687.20 -43.1 -40.6 -43.0 72 -99 SPO 1997 10 02 23 40 289 5.1 -9 687.30 -43.0 -40.5 -43.0 72 -99 SPO 1997 10 02 23 41 290 5.0 -9 687.30 -43.1 -40.2 -43.0 72 -99 SPO 1997 10 02 23 42 288 5.0 -9 687.30 -43.0 -40.3 -43.0 71 -99 SPO 1997 10 02 23 43 285 4.7 -9 687.40 -43.1 -40.5 -43.0 70 -99 SPO 1997 10 02 23 44 284 4.4 -9 687.40 -43.1 -40.6 -43.0 70 -99 SPO 1997 10 02 23 45 284 4.4 -9 687.40 -43.1 -40.4 -43.0 69 -99 SPO 1997 10 02 23 46 286 4.3 -9 687.40 -43.0 -40.4 -43.0 69 -99 SPO 1997 10 02 23 47 286 4.5 -9 687.30 -43.0 -40.7 -43.0 69 -99 SPO 1997 10 02 23 48 287 4.4 -9 687.30 -43.1 -40.8 -43.0 71 -99 SPO 1997 10 02 23 49 287 4.5 -9 687.30 -43.1 -40.9 -43.1 72 -99 SPO 1997 10 02 23 50 286 4.3 -9 687.30 -43.1 -41.0 -43.1 72 -99 SPO 1997 10 02 23 51 287 4.4 -9 687.30 -43.2 -41.1 -43.1 72 -99 SPO 1997 10 02 23 52 288 4.5 -9 687.30 -43.2 -41.0 -43.1 72 -99 SPO 1997 10 02 23 53 289 4.5 -9 687.30 -43.2 -40.8 -43.1 71 -99 SPO 1997 10 02 23 54 287 4.5 -9 687.30 -43.2 -40.9 -43.2 71 -99 SPO 1997 10 02 23 55 286 4.4 -9 687.20 -43.3 -41.0 -43.2 72 -99 SPO 1997 10 02 23 56 287 4.3 -9 687.30 -43.4 -41.0 -43.3 72 -99 SPO 1997 10 02 23 57 287 4.2 -9 687.30 -43.5 -41.1 -43.4 71 -99 SPO 1997 10 02 23 58 287 4.2 -9 687.30 -43.5 -41.2 -43.4 -99 -99 SPO 1997 10 02 23 59 286 4.2 -9 687.30 -43.5 -41.2 -43.4 -99 -99 SPO 1997 10 03 00 00 287 4.2 -9 687.20 -43.7 -41.3 -43.5 -99 0 SPO 1997 10 03 00 01 286 4.0 -9 687.30 -43.7 -41.4 -43.5 -99 -99 SPO 1997 10 03 00 02 288 4.0 -9 687.30 -43.7 -41.5 -43.6 -99 -99 SPO 1997 10 03 00 03 288 4.2 -9 687.30 -43.7 -41.5 -43.6 71 -99 SPO 1997 10 03 00 04 288 4.2 -9 687.20 -43.7 -41.5 -43.6 71 -99 SPO 1997 10 03 00 05 288 4.1 -9 687.30 -43.7 -41.6 -43.7 71 -99 SPO 1997 10 03 00 06 289 3.9 -9 687.30 -43.7 -41.7 -43.7 71 -99 SPO 1997 10 03 00 07 290 3.9 -9 687.30 -43.7 -41.9 -43.7 71 -99 SPO 1997 10 03 00 08 291 3.8 -9 687.30 -43.9 -42.0 -43.7 71 -99 SPO 1997 10 03 00 09 291 3.8 -9 687.30 -43.9 -42.2 -43.8 71 -99 SPO 1997 10 03 00 10 291 3.8 -9 687.30 -43.9 -42.2 -43.8 71 -99 SPO 1997 10 03 00 11 289 3.8 -9 687.30 -43.9 -42.2 -43.8 71 -99 SPO 1997 10 03 00 12 286 3.5 -9 687.30 -43.9 -42.2 -43.8 71 -99 SPO 1997 10 03 00 13 285 3.5 -9 687.30 -43.9 -42.4 -43.8 71 -99 SPO 1997 10 03 00 14 284 3.3 -9 687.30 -44.0 -42.4 -43.9 71 -99 SPO 1997 10 03 00 15 284 3.1 -9 687.30 -43.9 -42.5 -43.8 70 -99 SPO 1997 10 03 00 16 284 3.2 -9 687.30 -43.9 -42.6 -43.8 71 -99 SPO 1997 10 03 00 17 284 3.2 -9 687.30 -43.9 -42.6 -43.9 71 -99 SPO 1997 10 03 00 18 284 3.4 -9 687.30 -44.0 -42.6 -43.9 71 -99 SPO 1997 10 03 00 19 285 3.5 -9 687.20 -44.0 -42.6 -44.0 71 -99 SPO 1997 10 03 00 20 285 3.6 -9 687.20 -44.2 -42.6 -44.0 72 -99 SPO 1997 10 03 00 21 284 3.7 -9 687.20 -44.2 -42.7 -44.1 72 -99 SPO 1997 10 03 00 22 285 3.7 -9 687.20 -44.2 -42.8 -44.1 71 -99 SPO 1997 10 03 00 23 287 3.7 -9 687.20 -44.2 -42.8 -44.1 71 -99 SPO 1997 10 03 00 24 286 3.8 -9 687.20 -44.2 -42.7 -44.2 71 -99 SPO 1997 10 03 00 25 285 3.9 -9 687.20 -44.2 -42.6 -44.2 71 -99 SPO 1997 10 03 00 26 283 4.0 -9 687.20 -44.2 -42.5 -44.1 71 -99 SPO 1997 10 03 00 27 282 4.2 -9 687.20 -44.2 -42.5 -44.1 70 -99 SPO 1997 10 03 00 28 281 4.3 -9 687.20 -44.2 -42.4 -44.1 70 -99 SPO 1997 10 03 00 29 282 4.3 -9 687.20 -44.2 -42.4 -44.1 70 -99 SPO 1997 10 03 00 30 283 4.2 -9 687.10 -44.2 -42.4 -44.1 70 -99 SPO 1997 10 03 00 31 283 4.4 -9 687.10 -44.2 -42.3 -44.2 71 -99 SPO 1997 10 03 00 32 284 4.4 -9 687.10 -44.2 -42.3 -44.2 71 -99 SPO 1997 10 03 00 33 284 4.2 -9 687.10 -44.2 -42.2 -44.2 71 -99 SPO 1997 10 03 00 34 283 4.0 -9 687.10 -44.0 -42.3 -44.1 70 -99 SPO 1997 10 03 00 35 282 4.1 -9 687.20 -44.0 -42.4 -44.1 70 -99 SPO 1997 10 03 00 36 280 4.1 -9 687.20 -44.0 -42.4 -44.2 70 -99 SPO 1997 10 03 00 37 279 4.0 -9 687.20 -44.2 -42.4 -44.2 71 -99 SPO 1997 10 03 00 38 279 4.0 -9 687.20 -44.2 -42.5 -44.2 71 -99 SPO 1997 10 03 00 39 280 3.9 -9 687.20 -44.4 -42.6 -44.3 71 -99 SPO 1997 10 03 00 40 281 4.0 -9 687.20 -44.4 -42.5 -44.3 71 -99 SPO 1997 10 03 00 41 281 4.1 -9 687.20 -44.5 -42.3 -44.4 71 -99 SPO 1997 10 03 00 42 282 4.3 -9 687.20 -44.5 -42.1 -44.5 70 -99 SPO 1997 10 03 00 43 283 4.5 -9 687.10 -44.5 -41.9 -44.5 69 -99 SPO 1997 10 03 00 44 283 4.7 -9 687.10 -44.5 -41.9 -44.4 69 -99 SPO 1997 10 03 00 45 284 4.7 -9 687.10 -44.4 -41.8 -44.3 70 -99 SPO 1997 10 03 00 46 283 4.7 -9 687.10 -44.2 -41.8 -44.3 69 -99 SPO 1997 10 03 00 47 282 4.7 -9 687.10 -44.2 -42.0 -44.2 70 -99 SPO 1997 10 03 00 48 283 4.6 -9 687.10 -44.2 -42.0 -44.3 70 -99 SPO 1997 10 03 00 49 283 4.5 -9 687.10 -44.2 -42.1 -44.3 70 -99 SPO 1997 10 03 00 50 281 4.4 -9 687.20 -44.2 -42.2 -44.3 70 -99 SPO 1997 10 03 00 51 280 4.4 -9 687.20 -44.4 -42.2 -44.4 70 -99 SPO 1997 10 03 00 52 280 4.3 -9 687.20 -44.4 -42.0 -44.4 71 -99 SPO 1997 10 03 00 53 280 4.3 -9 687.20 -44.5 -41.6 -44.5 71 -99 SPO 1997 10 03 00 54 279 4.4 -9 687.20 -44.5 -41.1 -44.6 71 -99 SPO 1997 10 03 00 55 280 4.5 -9 687.20 -44.7 -40.6 -44.6 70 -99 SPO 1997 10 03 00 56 280 4.5 -9 687.20 -44.7 -40.4 -44.7 70 -99 SPO 1997 10 03 00 57 281 4.5 -9 687.20 -44.7 -40.3 -44.7 69 -99 SPO 1997 10 03 00 58 281 4.5 -9 687.20 -44.7 -40.2 -44.7 69 -99 SPO 1997 10 03 00 59 282 4.5 -9 687.20 -44.7 -40.2 -44.7 69 -99 SPO 1997 10 03 01 00 282 4.4 -9 687.20 -44.7 -40.2 -44.6 70 0 SPO 1997 10 03 01 01 284 4.3 -9 687.20 -44.7 -40.1 -44.6 70 -99 SPO 1997 10 03 01 02 284 4.1 -9 687.20 -44.7 -40.3 -44.6 70 -99 SPO 1997 10 03 01 03 285 3.8 -9 687.20 -44.7 -40.6 -44.6 70 -99 SPO 1997 10 03 01 04 285 3.7 -9 687.20 -44.7 -40.9 -44.7 70 -99 SPO 1997 10 03 01 05 286 3.6 -9 687.20 -44.7 -41.1 -44.7 70 -99 SPO 1997 10 03 01 06 287 3.4 -9 687.20 -44.7 -41.3 -44.7 70 -99 SPO 1997 10 03 01 07 287 3.3 -9 687.20 -44.9 -41.4 -44.8 72 -99 SPO 1997 10 03 01 08 288 3.3 -9 687.20 -44.9 -41.3 -44.8 72 -99 SPO 1997 10 03 01 09 289 3.2 -9 687.20 -45.0 -41.2 -44.8 73 -99 SPO 1997 10 03 01 10 289 3.1 -9 687.20 -45.0 -41.2 -44.9 71 -99 SPO 1997 10 03 01 11 289 3.1 -9 687.20 -45.0 -41.4 -44.9 70 -99 SPO 1997 10 03 01 12 289 3.2 -9 687.20 -45.0 -41.6 -44.9 70 -99 SPO 1997 10 03 01 13 289 3.0 -9 687.20 -45.2 -41.6 -45.0 72 -99 SPO 1997 10 03 01 14 287 3.1 -9 687.20 -45.0 -41.5 -44.9 70 -99 SPO 1997 10 03 01 15 286 3.1 -9 687.20 -45.0 -41.3 -45.0 70 -99 SPO 1997 10 03 01 16 284 3.2 -9 687.20 -45.0 -41.4 -44.9 70 -99 SPO 1997 10 03 01 17 285 3.2 -9 687.20 -45.2 -41.4 -45.0 71 -99 SPO 1997 10 03 01 18 285 3.2 -9 687.20 -45.2 -41.4 -45.0 71 -99 SPO 1997 10 03 01 19 285 3.2 -9 687.20 -45.2 -41.4 -45.1 72 -99 SPO 1997 10 03 01 20 285 3.1 -9 687.20 -45.2 -41.4 -45.1 72 -99 SPO 1997 10 03 01 21 285 3.1 -9 687.20 -45.2 -41.5 -45.1 71 -99 SPO 1997 10 03 01 22 285 3.0 -9 687.20 -45.2 -41.6 -45.1 71 -99 SPO 1997 10 03 01 23 285 3.0 -9 687.10 -45.2 -41.7 -45.1 70 -99 SPO 1997 10 03 01 24 285 2.9 -9 687.10 -45.2 -41.8 -45.0 70 -99 SPO 1997 10 03 01 25 286 2.9 -9 687.10 -45.0 -42.0 -45.0 68 -99 SPO 1997 10 03 01 26 285 2.9 -9 687.20 -45.2 -42.1 -45.0 70 -99 SPO 1997 10 03 01 27 284 2.9 -9 687.20 -45.2 -42.1 -45.0 70 -99 SPO 1997 10 03 01 28 284 2.9 -9 687.20 -45.2 -42.1 -45.0 70 -99 SPO 1997 10 03 01 29 282 3.0 -9 687.20 -45.2 -42.2 -45.0 71 -99 SPO 1997 10 03 01 30 282 2.9 -9 687.10 -45.2 -42.3 -45.0 71 -99 SPO 1997 10 03 01 31 282 3.0 -9 687.10 -45.0 -42.3 -45.0 70 -99 SPO 1997 10 03 01 32 281 2.9 -9 687.10 -45.0 -42.3 -45.0 71 -99 SPO 1997 10 03 01 33 280 2.8 -9 687.10 -45.0 -42.4 -44.9 71 -99 SPO 1997 10 03 01 34 280 2.8 -9 687.10 -45.0 -42.5 -44.9 71 -99 SPO 1997 10 03 01 35 280 2.8 -9 687.10 -45.0 -42.5 -44.9 71 -99 SPO 1997 10 03 01 36 280 2.6 -9 687.10 -45.0 -42.6 -44.9 71 -99 SPO 1997 10 03 01 37 280 2.5 -9 687.10 -44.9 -42.6 -44.8 71 -99 SPO 1997 10 03 01 38 280 2.5 -9 687.10 -44.7 -42.5 -44.7 70 -99 SPO 1997 10 03 01 39 280 2.4 -9 687.10 -44.7 -42.5 -44.7 70 -99 SPO 1997 10 03 01 40 280 2.3 -9 687.10 -44.5 -42.4 -44.6 70 -99 SPO 1997 10 03 01 41 279 2.3 -9 687.10 -44.5 -42.4 -44.5 71 -99 SPO 1997 10 03 01 42 276 2.1 -9 687.00 -44.4 -42.4 -44.4 71 -99 SPO 1997 10 03 01 43 275 2.3 -9 687.00 -44.2 -42.4 -44.4 71 -99 SPO 1997 10 03 01 44 275 2.5 -9 687.00 -44.2 -42.4 -44.2 71 -99 SPO 1997 10 03 01 45 276 2.9 -9 687.00 -44.0 -42.3 -44.2 71 -99 SPO 1997 10 03 01 46 274 3.0 -9 687.00 -44.0 -42.2 -44.1 71 -99 SPO 1997 10 03 01 47 271 3.0 -9 687.00 -44.0 -41.8 -44.1 72 -99 SPO 1997 10 03 01 48 273 3.3 -9 687.00 -44.0 -41.6 -44.1 71 -99 SPO 1997 10 03 01 49 270 3.3 -9 687.00 -44.0 -41.6 -44.1 71 -99 SPO 1997 10 03 01 50 269 3.5 -9 687.00 -44.0 -41.5 -44.1 71 -99 SPO 1997 10 03 01 51 269 3.6 -9 687.00 -44.0 -41.7 -44.1 71 -99 SPO 1997 10 03 01 52 270 3.3 -9 687.00 -44.0 -41.4 -44.1 71 -99 SPO 1997 10 03 01 53 269 3.2 -9 687.00 -44.0 -41.1 -44.1 71 -99 SPO 1997 10 03 01 54 271 3.4 -9 686.90 -44.0 -40.9 -44.0 71 -99 SPO 1997 10 03 01 55 271 3.4 -9 686.90 -44.0 -40.5 -44.0 71 -99 SPO 1997 10 03 01 56 273 3.6 -9 686.90 -43.9 -40.5 -44.0 71 -99 SPO 1997 10 03 01 57 274 3.5 -9 686.90 -43.9 -40.4 -44.0 71 -99 SPO 1997 10 03 01 58 278 3.2 -9 686.80 -43.9 -40.4 -44.0 71 -99 SPO 1997 10 03 01 59 278 3.5 -9 686.80 -43.7 -40.3 -43.8 70 -99 SPO 1997 10 03 02 00 276 3.6 -9 686.90 -43.5 -40.4 -43.7 68 0 SPO 1997 10 03 02 01 274 3.6 -9 686.90 -43.4 -40.5 -43.5 69 -99 SPO 1997 10 03 02 02 273 3.5 -9 686.90 -43.2 -40.7 -43.3 68 -99 SPO 1997 10 03 02 03 271 3.3 -9 686.90 -43.0 -40.9 -43.2 69 -99 SPO 1997 10 03 02 04 271 3.2 -9 686.90 -43.0 -40.9 -43.1 71 -99 SPO 1997 10 03 02 05 272 3.2 -9 686.90 -43.0 -40.9 -43.1 72 -99 SPO 1997 10 03 02 06 271 3.1 -9 686.90 -43.0 -41.0 -43.2 72 -99 SPO 1997 10 03 02 07 271 3.1 -9 686.90 -43.0 -41.0 -43.2 72 -99 SPO 1997 10 03 02 08 271 3.2 -9 686.90 -43.0 -41.1 -43.1 71 -99 SPO 1997 10 03 02 09 271 3.2 -9 686.90 -42.9 -41.2 -43.0 70 -99 SPO 1997 10 03 02 10 271 3.2 -9 686.90 -42.7 -41.4 -42.9 69 -99 SPO 1997 10 03 02 11 269 3.1 -9 686.90 -42.5 -41.4 -42.7 69 -99 SPO 1997 10 03 02 12 270 2.9 -9 686.90 -42.5 -41.4 -42.6 70 -99 SPO 1997 10 03 02 13 269 3.0 -9 686.90 -42.4 -41.2 -42.5 71 -99 SPO 1997 10 03 02 14 269 2.8 -9 686.90 -42.2 -41.1 -42.4 71 -99 SPO 1997 10 03 02 15 268 3.1 -9 686.90 -42.2 -41.3 -42.3 72 -99 SPO 1997 10 03 02 16 268 2.9 -9 686.90 -42.0 -41.3 -42.2 71 -99 SPO 1997 10 03 02 17 269 3.3 -9 686.90 -42.0 -41.3 -42.1 72 -99 SPO 1997 10 03 02 18 268 3.5 -9 686.90 -41.7 -41.2 -42.0 70 -99 SPO 1997 10 03 02 19 268 3.7 -9 686.90 -41.7 -41.1 -42.0 71 -99 SPO 1997 10 03 02 20 269 3.8 -9 686.90 -41.7 -41.1 -41.9 71 -99 SPO 1997 10 03 02 21 270 3.9 -9 686.90 -41.5 -41.0 -41.8 70 -99 SPO 1997 10 03 02 22 271 3.9 -9 686.90 -41.5 -41.0 -41.7 71 -99 SPO 1997 10 03 02 23 270 4.1 -9 686.80 -41.5 -41.0 -41.7 71 -99 SPO 1997 10 03 02 24 270 4.3 -9 686.80 -41.5 -41.0 -41.6 72 -99 SPO 1997 10 03 02 25 269 4.4 -9 686.80 -41.4 -40.9 -41.6 71 -99 SPO 1997 10 03 02 26 269 4.3 -9 686.80 -41.4 -40.9 -41.5 72 -99 SPO 1997 10 03 02 27 267 4.4 -9 686.80 -41.2 -40.9 -41.5 71 -99 SPO 1997 10 03 02 28 267 4.2 -9 686.80 -41.2 -41.0 -41.4 72 -99 SPO 1997 10 03 02 29 268 4.2 -9 686.80 -41.2 -40.9 -41.3 73 -99 SPO 1997 10 03 02 30 268 4.4 -9 686.80 -41.2 -40.8 -41.3 73 -99 SPO 1997 10 03 02 31 267 4.4 -9 686.80 -41.0 -40.8 -41.2 71 -99 SPO 1997 10 03 02 32 269 4.1 -9 686.80 -41.2 -40.7 -41.3 73 -99 SPO 1997 10 03 02 33 268 4.2 -9 686.80 -41.2 -40.6 -41.2 73 -99 SPO 1997 10 03 02 34 268 4.1 -9 686.80 -41.0 -40.7 -41.2 71 -99 SPO 1997 10 03 02 35 267 4.0 -9 686.80 -41.0 -40.6 -41.1 71 -99 SPO 1997 10 03 02 36 266 4.5 -9 686.80 -41.0 -40.7 -41.1 72 -99 SPO 1997 10 03 02 37 266 4.2 -9 686.80 -40.9 -40.7 -41.0 71 -99 SPO 1997 10 03 02 38 268 4.0 -9 686.80 -40.9 -40.6 -41.0 71 -99 SPO 1997 10 03 02 39 268 4.1 -9 686.80 -40.9 -40.6 -40.9 71 -99 SPO 1997 10 03 02 40 270 3.6 -9 686.80 -40.7 -40.6 -40.9 70 -99 SPO 1997 10 03 02 41 272 3.4 -9 686.80 -40.7 -40.6 -40.8 71 -99 SPO 1997 10 03 02 42 271 3.3 -9 686.80 -40.7 -40.6 -40.8 74 -99 SPO 1997 10 03 02 43 273 3.8 -9 686.70 -40.7 -40.6 -40.8 74 -99 SPO 1997 10 03 02 44 273 3.6 -9 686.70 -40.7 -40.4 -40.8 74 -99 SPO 1997 10 03 02 45 274 3.6 -9 686.70 -40.7 -40.4 -40.7 74 -99 SPO 1997 10 03 02 46 276 3.6 -9 686.70 -40.5 -40.3 -40.7 74 -99 SPO 1997 10 03 02 47 276 3.8 -9 686.70 -40.5 -40.3 -40.7 74 -99 SPO 1997 10 03 02 48 277 3.7 -9 686.70 -40.5 -40.3 -40.6 74 -99 SPO 1997 10 03 02 49 277 3.5 -9 686.70 -40.5 -40.3 -40.6 74 -99 SPO 1997 10 03 02 50 279 3.7 -9 686.60 -40.5 -40.2 -40.6 74 -99 SPO 1997 10 03 02 51 277 3.7 -9 686.60 -40.4 -40.3 -40.5 74 -99 SPO 1997 10 03 02 52 278 3.7 -9 686.60 -40.4 -40.3 -40.5 74 -99 SPO 1997 10 03 02 53 278 3.9 -9 686.60 -40.4 -40.2 -40.5 73 -99 SPO 1997 10 03 02 54 278 3.7 -9 686.60 -40.4 -40.2 -40.5 73 -99 SPO 1997 10 03 02 55 278 3.8 -9 686.60 -40.4 -40.2 -40.4 72 -99 SPO 1997 10 03 02 56 275 3.9 -9 686.60 -40.2 -40.2 -40.4 71 -99 SPO 1997 10 03 02 57 274 3.8 -9 686.60 -40.2 -40.1 -40.3 72 -99 SPO 1997 10 03 02 58 273 3.9 -9 686.60 -40.2 -40.1 -40.3 73 -99 SPO 1997 10 03 02 59 274 4.0 -9 686.60 -40.2 -40.1 -40.3 73 -99 SPO 1997 10 03 03 00 276 3.9 -9 686.60 -40.2 -40.1 -40.2 73 0 SPO 1997 10 03 03 01 276 3.5 -9 686.60 -40.2 -40.1 -40.2 74 -99 SPO 1997 10 03 03 02 276 3.8 -9 686.60 -40.2 -40.2 -40.2 75 -99 SPO 1997 10 03 03 03 276 3.9 -9 686.60 -40.0 -40.2 -40.2 73 -99 SPO 1997 10 03 03 04 276 3.6 -9 686.60 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 03 03 05 275 3.4 -9 686.60 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 03 03 06 273 3.4 -9 686.60 -40.0 -40.2 -40.1 73 -99 SPO 1997 10 03 03 07 273 3.5 -9 686.60 -40.0 -40.2 -40.1 74 -99 SPO 1997 10 03 03 08 272 3.7 -9 686.60 -40.0 -40.1 -40.0 73 -99 SPO 1997 10 03 03 09 272 3.6 -9 686.60 -40.0 -40.1 -40.0 73 -99 SPO 1997 10 03 03 10 272 3.5 -9 686.60 -40.0 -40.0 -40.0 73 -99 SPO 1997 10 03 03 11 272 3.1 -9 686.60 -40.0 -40.0 -40.0 73 -99 SPO 1997 10 03 03 12 273 3.0 -9 686.60 -39.7 -39.9 -39.9 72 -99 SPO 1997 10 03 03 13 272 3.3 -9 686.60 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 03 14 273 3.1 -9 686.60 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 03 03 15 269 3.0 -9 686.60 -39.7 -39.8 -39.8 74 -99 SPO 1997 10 03 03 16 273 2.9 -9 686.60 -39.7 -39.8 -39.8 74 -99 SPO 1997 10 03 03 17 271 3.0 -9 686.70 -39.7 -39.8 -39.7 74 -99 SPO 1997 10 03 03 18 269 3.0 -9 686.70 -39.5 -39.7 -39.7 72 -99 SPO 1997 10 03 03 19 271 2.8 -9 686.70 -39.5 -39.7 -39.7 72 -99 SPO 1997 10 03 03 20 270 2.6 -9 686.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 03 21 270 2.9 -9 686.70 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 03 22 268 2.8 -9 686.70 -39.5 -39.7 -39.6 73 -99 SPO 1997 10 03 03 23 266 2.7 -9 686.70 -39.5 -39.7 -39.6 74 -99 SPO 1997 10 03 03 24 267 2.9 -9 686.70 -39.5 -39.7 -39.5 73 -99 SPO 1997 10 03 03 25 268 2.8 -9 686.70 -39.5 -39.7 -39.5 73 -99 SPO 1997 10 03 03 26 267 2.8 -9 686.70 -39.5 -39.6 -39.5 73 -99 SPO 1997 10 03 03 27 266 2.9 -9 686.70 -39.4 -39.6 -39.5 73 -99 SPO 1997 10 03 03 28 268 2.9 -9 686.70 -39.4 -39.5 -39.4 73 -99 SPO 1997 10 03 03 29 270 3.0 -9 686.70 -39.4 -39.4 -39.4 74 -99 SPO 1997 10 03 03 30 271 2.9 -9 686.60 -39.4 -39.4 -39.4 74 -99 SPO 1997 10 03 03 31 272 2.7 -9 686.60 -39.4 -39.2 -39.4 74 -99 SPO 1997 10 03 03 32 270 2.6 -9 686.60 -39.4 -39.2 -39.4 75 -99 SPO 1997 10 03 03 33 269 2.9 -9 686.60 -39.2 -39.1 -39.3 73 -99 SPO 1997 10 03 03 34 270 2.5 -9 686.60 -39.2 -39.2 -39.3 73 -99 SPO 1997 10 03 03 35 269 2.7 -9 686.70 -39.2 -39.2 -39.3 74 -99 SPO 1997 10 03 03 36 270 2.7 -9 686.70 -39.2 -39.2 -39.3 73 -99 SPO 1997 10 03 03 37 270 2.6 -9 686.60 -39.2 -39.3 -39.3 73 -99 SPO 1997 10 03 03 38 271 2.4 -9 686.60 -39.2 -39.3 -39.3 73 -99 SPO 1997 10 03 03 39 272 2.6 -9 686.60 -39.2 -39.3 -39.2 73 -99 SPO 1997 10 03 03 40 271 2.7 -9 686.60 -39.2 -39.3 -39.2 73 -99 SPO 1997 10 03 03 41 272 2.6 -9 686.60 -39.2 -39.4 -39.2 73 -99 SPO 1997 10 03 03 42 273 2.7 -9 686.60 -39.2 -39.4 -39.2 73 -99 SPO 1997 10 03 03 43 271 2.8 -9 686.60 -39.2 -39.4 -39.2 74 -99 SPO 1997 10 03 03 44 270 3.0 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 45 272 2.9 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 46 271 3.1 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 47 272 3.1 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 48 272 3.2 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 49 272 3.0 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 50 274 3.2 -9 686.60 -39.2 -39.4 -39.2 76 -99 SPO 1997 10 03 03 51 277 2.8 -9 686.60 -39.2 -39.3 -39.1 76 -99 SPO 1997 10 03 03 52 278 2.5 -9 686.50 -39.0 -39.3 -39.1 74 -99 SPO 1997 10 03 03 53 279 2.5 -9 686.60 -39.0 -39.3 -39.1 74 -99 SPO 1997 10 03 03 54 281 2.4 -9 686.50 -39.0 -39.3 -39.1 75 -99 SPO 1997 10 03 03 55 283 2.6 -9 686.60 -39.0 -39.3 -39.1 76 -99 SPO 1997 10 03 03 56 284 2.6 -9 686.50 -39.0 -39.2 -39.1 76 -99 SPO 1997 10 03 03 57 284 2.4 -9 686.50 -39.0 -39.2 -39.1 75 -99 SPO 1997 10 03 03 58 282 2.6 -9 686.50 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 03 59 283 2.3 -9 686.60 -39.0 -39.1 -39.0 75 -99 SPO 1997 10 03 04 00 281 2.6 -9 686.50 -39.0 -39.1 -39.0 75 0 SPO 1997 10 03 04 01 282 2.8 -9 686.50 -39.0 -39.1 -39.0 76 -99 SPO 1997 10 03 04 02 283 2.5 -9 686.50 -38.9 -39.1 -39.0 75 -99 SPO 1997 10 03 04 03 280 2.5 -9 686.50 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 04 04 283 2.2 -9 686.50 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 04 05 281 2.4 -9 686.50 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 04 06 280 2.4 -9 686.50 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 04 07 284 2.0 -9 686.50 -38.7 -39.1 -38.8 74 -99 SPO 1997 10 03 04 08 288 2.2 -9 686.50 -38.7 -39.0 -38.8 74 -99 SPO 1997 10 03 04 09 286 2.3 -9 686.50 -38.7 -39.0 -38.8 74 -99 SPO 1997 10 03 04 10 287 2.3 -9 686.50 -38.7 -39.0 -38.8 75 -99 SPO 1997 10 03 04 11 286 2.6 -9 686.50 -38.7 -39.0 -38.8 75 -99 SPO 1997 10 03 04 12 290 2.2 -9 686.50 -38.7 -39.0 -38.8 75 -99 SPO 1997 10 03 04 13 292 2.4 -9 686.50 -38.7 -38.9 -38.8 75 -99 SPO 1997 10 03 04 14 290 2.4 -9 686.50 -38.7 -38.9 -38.7 74 -99 SPO 1997 10 03 04 15 290 2.3 -9 686.50 -38.7 -38.9 -38.7 75 -99 SPO 1997 10 03 04 16 291 2.1 -9 686.50 -38.5 -38.9 -38.7 73 -99 SPO 1997 10 03 04 17 294 2.4 -9 686.50 -38.7 -38.8 -38.6 75 -99 SPO 1997 10 03 04 18 296 2.4 -9 686.50 -38.7 -38.8 -38.7 76 -99 SPO 1997 10 03 04 19 296 2.2 -9 686.50 -38.5 -38.8 -38.6 75 -99 SPO 1997 10 03 04 20 297 2.1 -9 686.40 -38.5 -38.8 -38.6 76 -99 SPO 1997 10 03 04 21 297 2.1 -9 686.40 -38.5 -38.8 -38.6 76 -99 SPO 1997 10 03 04 22 297 2.1 -9 686.40 -38.5 -38.8 -38.6 76 -99 SPO 1997 10 03 04 23 294 2.1 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 24 297 2.0 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 25 296 2.0 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 26 298 2.1 -9 686.40 -38.5 -38.8 -38.6 76 -99 SPO 1997 10 03 04 27 299 2.2 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 28 299 2.1 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 29 298 2.2 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 30 299 2.0 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 31 299 1.9 -9 686.40 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 32 299 2.0 -9 686.50 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 33 298 2.2 -9 686.50 -38.5 -38.8 -38.5 76 -99 SPO 1997 10 03 04 34 301 2.3 -9 686.40 -38.5 -38.7 -38.5 76 -99 SPO 1997 10 03 04 35 297 2.2 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 36 299 2.6 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 37 299 2.8 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 38 302 2.6 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 39 303 2.8 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 40 303 2.8 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 41 306 2.6 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 42 308 2.6 -9 686.30 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 43 305 2.6 -9 686.30 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 44 306 2.4 -9 686.30 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 45 307 2.8 -9 686.30 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 46 304 2.5 -9 686.30 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 47 302 2.6 -9 686.30 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 48 303 2.7 -9 686.30 -38.4 -38.7 -38.3 76 -99 SPO 1997 10 03 04 49 305 2.8 -9 686.30 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 50 304 2.8 -9 686.30 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 51 305 2.7 -9 686.30 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 52 307 2.7 -9 686.30 -38.2 -38.7 -38.3 74 -99 SPO 1997 10 03 04 53 311 2.5 -9 686.40 -38.2 -38.7 -38.3 75 -99 SPO 1997 10 03 04 54 309 2.8 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 55 308 2.6 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 56 309 2.4 -9 686.40 -38.4 -38.7 -38.4 76 -99 SPO 1997 10 03 04 57 311 2.1 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 04 58 308 2.3 -9 686.40 -38.2 -38.6 -38.3 75 -99 SPO 1997 10 03 04 59 309 2.5 -9 686.40 -38.2 -38.6 -38.3 76 -99 SPO 1997 10 03 05 00 312 2.5 -9 686.40 -38.2 -38.6 -38.3 76 0 SPO 1997 10 03 05 01 314 2.6 -9 686.40 -38.2 -38.6 -38.3 76 -99 SPO 1997 10 03 05 02 314 2.6 -9 686.40 -38.2 -38.6 -38.3 76 -99 SPO 1997 10 03 05 03 312 2.7 -9 686.40 -38.4 -38.6 -38.3 76 -99 SPO 1997 10 03 05 04 313 2.5 -9 686.40 -38.2 -38.5 -38.3 74 -99 SPO 1997 10 03 05 05 311 2.4 -9 686.40 -38.2 -38.5 -38.3 73 -99 SPO 1997 10 03 05 06 307 2.6 -9 686.40 -38.4 -38.5 -38.3 74 -99 SPO 1997 10 03 05 07 306 2.6 -9 686.40 -38.4 -38.6 -38.3 75 -99 SPO 1997 10 03 05 08 306 2.6 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 09 309 2.5 -9 686.40 -38.4 -38.5 -38.4 76 -99 SPO 1997 10 03 05 10 309 2.4 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 11 312 2.5 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 12 312 2.5 -9 686.40 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 13 312 2.5 -9 686.40 -38.4 -38.4 -38.4 76 -99 SPO 1997 10 03 05 14 310 2.3 -9 686.40 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 15 306 2.3 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 16 303 2.2 -9 686.50 -38.4 -38.4 -38.3 76 -99 SPO 1997 10 03 05 17 302 2.2 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 18 301 2.2 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 19 298 2.3 -9 686.50 -38.4 -38.4 -38.3 76 -99 SPO 1997 10 03 05 20 297 2.4 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 21 299 2.6 -9 686.50 -38.2 -38.5 -38.3 75 -99 SPO 1997 10 03 05 22 299 2.7 -9 686.50 -38.2 -38.5 -38.3 75 -99 SPO 1997 10 03 05 23 299 2.6 -9 686.50 -38.2 -38.5 -38.3 74 -99 SPO 1997 10 03 05 24 299 2.5 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 25 298 2.5 -9 686.50 -38.4 -38.5 -38.3 75 -99 SPO 1997 10 03 05 26 298 2.5 -9 686.50 -38.4 -38.5 -38.3 75 -99 SPO 1997 10 03 05 27 296 2.2 -9 686.50 -38.4 -38.5 -38.3 76 -99 SPO 1997 10 03 05 28 294 2.4 -9 686.50 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 29 293 2.4 -9 686.50 -38.4 -38.6 -38.4 76 -99 SPO 1997 10 03 05 30 293 2.4 -9 686.50 -38.5 -38.6 -38.4 76 -99 SPO 1997 10 03 05 31 293 2.5 -9 686.50 -38.5 -38.6 -38.4 76 -99 SPO 1997 10 03 05 32 293 2.4 -9 686.50 -38.5 -38.6 -38.4 76 -99 SPO 1997 10 03 05 33 293 2.4 -9 686.50 -38.5 -38.6 -38.4 76 -99 SPO 1997 10 03 05 34 295 2.5 -9 686.40 -38.5 -38.6 -38.4 75 -99 SPO 1997 10 03 05 35 296 2.7 -9 686.40 -38.5 -38.6 -38.4 75 -99 SPO 1997 10 03 05 36 298 2.6 -9 686.40 -38.5 -38.6 -38.4 76 -99 SPO 1997 10 03 05 37 300 2.8 -9 686.40 -38.5 -38.7 -38.4 76 -99 SPO 1997 10 03 05 38 300 3.0 -9 686.40 -38.5 -38.7 -38.5 76 -99 SPO 1997 10 03 05 39 301 2.8 -9 686.40 -38.5 -38.7 -38.5 76 -99 SPO 1997 10 03 05 40 301 2.8 -9 686.40 -38.5 -38.7 -38.5 75 -99 SPO 1997 10 03 05 41 302 2.9 -9 686.40 -38.7 -38.7 -38.6 76 -99 SPO 1997 10 03 05 42 304 3.0 -9 686.40 -38.7 -38.7 -38.6 76 -99 SPO 1997 10 03 05 43 304 3.0 -9 686.40 -38.7 -38.7 -38.6 75 -99 SPO 1997 10 03 05 44 305 3.0 -9 686.40 -38.7 -38.7 -38.7 75 -99 SPO 1997 10 03 05 45 307 3.0 -9 686.40 -38.7 -38.7 -38.7 75 -99 SPO 1997 10 03 05 46 306 2.8 -9 686.40 -38.9 -38.7 -38.8 76 -99 SPO 1997 10 03 05 47 307 2.8 -9 686.40 -38.9 -38.7 -38.8 76 -99 SPO 1997 10 03 05 48 307 2.8 -9 686.40 -39.0 -38.7 -38.8 76 -99 SPO 1997 10 03 05 49 307 2.9 -9 686.40 -39.0 -38.7 -38.9 76 -99 SPO 1997 10 03 05 50 305 2.9 -9 686.40 -39.0 -38.8 -38.9 77 -99 SPO 1997 10 03 05 51 304 2.9 -9 686.40 -39.0 -38.8 -38.9 76 -99 SPO 1997 10 03 05 52 305 2.8 -9 686.40 -39.0 -38.8 -38.9 76 -99 SPO 1997 10 03 05 53 307 2.8 -9 686.30 -39.0 -38.8 -38.9 76 -99 SPO 1997 10 03 05 54 308 2.8 -9 686.30 -39.0 -38.8 -39.0 76 -99 SPO 1997 10 03 05 55 308 2.7 -9 686.30 -39.0 -38.8 -39.0 75 -99 SPO 1997 10 03 05 56 310 2.8 -9 686.30 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 05 57 309 2.9 -9 686.30 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 05 58 310 3.0 -9 686.30 -39.2 -38.8 -39.0 74 -99 SPO 1997 10 03 05 59 310 3.0 -9 686.20 -39.2 -38.8 -39.1 73 -99 SPO 1997 10 03 06 00 311 3.0 -9 686.30 -39.2 -38.8 -39.2 74 0 SPO 1997 10 03 06 01 312 2.9 -9 686.20 -39.4 -38.8 -39.2 77 -99 SPO 1997 10 03 06 02 313 3.0 -9 686.20 -39.4 -38.8 -39.2 77 -99 SPO 1997 10 03 06 03 312 3.0 -9 686.30 -39.5 -38.7 -39.3 76 -99 SPO 1997 10 03 06 04 311 3.0 -9 686.30 -39.5 -38.8 -39.3 75 -99 SPO 1997 10 03 06 05 311 3.0 -9 686.20 -39.5 -38.8 -39.3 75 -99 SPO 1997 10 03 06 06 310 2.8 -9 686.20 -39.5 -38.9 -39.4 75 -99 SPO 1997 10 03 06 07 309 2.8 -9 686.20 -39.5 -38.9 -39.4 74 -99 SPO 1997 10 03 06 08 309 2.8 -9 686.20 -39.5 -38.9 -39.4 73 -99 SPO 1997 10 03 06 09 311 2.7 -9 686.20 -39.5 -38.9 -39.4 73 -99 SPO 1997 10 03 06 10 316 2.6 -9 686.20 -39.5 -38.9 -39.4 73 -99 SPO 1997 10 03 06 11 317 2.7 -9 686.10 -39.5 -38.9 -39.4 74 -99 SPO 1997 10 03 06 12 317 2.7 -9 686.10 -39.5 -38.8 -39.4 75 -99 SPO 1997 10 03 06 13 316 2.7 -9 686.10 -39.5 -38.8 -39.4 76 -99 SPO 1997 10 03 06 14 316 2.8 -9 686.10 -39.5 -38.7 -39.3 75 -99 SPO 1997 10 03 06 15 316 2.8 -9 686.10 -39.4 -38.7 -39.3 74 -99 SPO 1997 10 03 06 16 316 2.8 -9 686.10 -39.4 -38.7 -39.3 75 -99 SPO 1997 10 03 06 17 317 2.8 -9 686.10 -39.4 -38.8 -39.3 75 -99 SPO 1997 10 03 06 18 320 2.7 -9 686.10 -39.4 -38.8 -39.3 75 -99 SPO 1997 10 03 06 19 320 2.6 -9 686.10 -39.2 -38.8 -39.2 76 -99 SPO 1997 10 03 06 20 321 2.7 -9 686.10 -39.2 -38.8 -39.2 76 -99 SPO 1997 10 03 06 21 321 2.7 -9 686.10 -39.2 -38.8 -39.2 76 -99 SPO 1997 10 03 06 22 320 2.8 -9 686.10 -39.2 -38.8 -39.2 74 -99 SPO 1997 10 03 06 23 320 2.9 -9 686.10 -39.2 -38.9 -39.2 76 -99 SPO 1997 10 03 06 24 320 2.9 -9 686.10 -39.2 -38.9 -39.2 76 -99 SPO 1997 10 03 06 25 319 2.9 -9 686.10 -39.2 -38.9 -39.2 76 -99 SPO 1997 10 03 06 26 319 2.9 -9 686.00 -39.2 -38.9 -39.2 76 -99 SPO 1997 10 03 06 27 320 3.0 -9 686.10 -39.2 -38.9 -39.2 76 -99 SPO 1997 10 03 06 28 318 2.9 -9 686.00 -39.2 -38.9 -39.1 76 -99 SPO 1997 10 03 06 29 318 3.1 -9 686.00 -39.2 -38.9 -39.1 76 -99 SPO 1997 10 03 06 30 316 3.1 -9 686.00 -39.2 -38.9 -39.1 76 -99 SPO 1997 10 03 06 31 314 3.0 -9 686.00 -39.0 -38.9 -39.1 72 -99 SPO 1997 10 03 06 32 315 3.2 -9 686.00 -39.2 -39.0 -39.1 73 -99 SPO 1997 10 03 06 33 317 3.0 -9 686.10 -39.2 -39.0 -39.1 74 -99 SPO 1997 10 03 06 34 316 3.0 -9 686.10 -39.2 -39.1 -39.1 76 -99 SPO 1997 10 03 06 35 316 2.8 -9 686.10 -39.2 -39.1 -39.1 76 -99 SPO 1997 10 03 06 36 317 2.8 -9 686.10 -39.2 -39.1 -39.1 76 -99 SPO 1997 10 03 06 37 317 2.8 -9 686.10 -39.2 -39.1 -39.1 76 -99 SPO 1997 10 03 06 38 320 2.7 -9 686.00 -39.2 -39.2 -39.1 76 -99 SPO 1997 10 03 06 39 321 2.7 -9 686.10 -39.0 -39.2 -39.1 75 -99 SPO 1997 10 03 06 40 320 2.6 -9 686.10 -39.0 -39.2 -39.1 74 -99 SPO 1997 10 03 06 41 320 2.6 -9 686.10 -39.0 -39.2 -39.1 74 -99 SPO 1997 10 03 06 42 318 2.6 -9 686.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 10 03 06 43 318 2.5 -9 686.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 10 03 06 44 321 2.4 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 06 45 322 2.4 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 46 320 2.3 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 47 321 2.6 -9 686.10 -39.0 -39.2 -39.0 76 -99 SPO 1997 10 03 06 48 320 2.4 -9 686.10 -39.0 -39.2 -39.0 76 -99 SPO 1997 10 03 06 49 318 2.5 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 06 50 318 2.6 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 06 51 316 2.7 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 06 52 311 2.6 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 06 53 312 2.6 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 54 311 2.7 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 55 310 2.7 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 56 309 3.0 -9 686.10 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 06 57 311 3.0 -9 686.10 -39.0 -39.0 -39.0 76 -99 SPO 1997 10 03 06 58 310 3.1 -9 686.10 -39.0 -39.0 -39.0 76 -99 SPO 1997 10 03 06 59 307 3.0 -9 686.10 -38.9 -39.1 -39.0 75 -99 SPO 1997 10 03 07 00 306 3.0 -9 686.10 -38.9 -39.1 -38.9 75 0 SPO 1997 10 03 07 01 306 2.9 -9 686.10 -38.9 -39.1 -38.9 75 -99 SPO 1997 10 03 07 02 303 2.8 -9 686.10 -38.9 -39.1 -38.9 75 -99 SPO 1997 10 03 07 03 299 2.9 -9 686.10 -38.9 -39.0 -38.9 75 -99 SPO 1997 10 03 07 04 301 2.9 -9 686.10 -38.9 -39.1 -38.9 75 -99 SPO 1997 10 03 07 05 301 3.2 -9 686.10 -38.9 -39.1 -38.9 74 -99 SPO 1997 10 03 07 06 301 3.1 -9 686.10 -38.9 -39.1 -38.9 74 -99 SPO 1997 10 03 07 07 304 3.1 -9 686.10 -38.9 -39.0 -38.9 74 -99 SPO 1997 10 03 07 08 304 3.1 -9 686.10 -38.9 -39.0 -38.9 74 -99 SPO 1997 10 03 07 09 305 3.1 -9 686.10 -38.9 -39.1 -38.9 75 -99 SPO 1997 10 03 07 10 306 2.9 -9 686.10 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 07 11 305 3.1 -9 686.10 -38.9 -39.1 -38.9 76 -99 SPO 1997 10 03 07 12 309 2.8 -9 686.00 -38.9 -39.1 -38.9 75 -99 SPO 1997 10 03 07 13 309 2.9 -9 686.10 -38.9 -39.1 -38.9 74 -99 SPO 1997 10 03 07 14 309 3.0 -9 686.10 -38.9 -39.2 -38.9 74 -99 SPO 1997 10 03 07 15 308 3.0 -9 686.10 -38.9 -39.2 -38.9 75 -99 SPO 1997 10 03 07 16 311 2.5 -9 686.10 -38.9 -39.2 -38.9 75 -99 SPO 1997 10 03 07 17 309 2.8 -9 686.10 -38.9 -39.2 -38.9 75 -99 SPO 1997 10 03 07 18 309 3.0 -9 686.10 -39.0 -39.2 -38.9 76 -99 SPO 1997 10 03 07 19 308 3.0 -9 686.10 -39.0 -39.2 -39.0 76 -99 SPO 1997 10 03 07 20 306 3.0 -9 686.00 -39.0 -39.2 -39.0 76 -99 SPO 1997 10 03 07 21 303 3.3 -9 686.00 -39.0 -39.2 -39.0 76 -99 SPO 1997 10 03 07 22 305 3.1 -9 686.00 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 23 307 2.8 -9 686.00 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 24 309 2.8 -9 686.00 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 07 25 307 2.9 -9 686.00 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 26 307 2.8 -9 686.00 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 07 27 305 2.7 -9 686.00 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 07 28 306 2.6 -9 686.00 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 07 29 305 3.0 -9 686.00 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 07 30 305 2.9 -9 686.00 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 07 31 303 2.8 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 32 301 2.9 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 33 302 2.7 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 34 302 3.2 -9 686.00 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 35 303 3.0 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 36 305 3.1 -9 686.10 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 37 305 3.2 -9 686.00 -39.0 -39.3 -39.0 74 -99 SPO 1997 10 03 07 38 305 3.1 -9 686.00 -39.0 -39.3 -39.1 74 -99 SPO 1997 10 03 07 39 310 2.9 -9 686.00 -39.0 -39.3 -39.1 72 -99 SPO 1997 10 03 07 40 312 2.9 -9 686.00 -39.0 -39.3 -39.0 72 -99 SPO 1997 10 03 07 41 312 3.1 -9 686.00 -39.0 -39.3 -39.0 72 -99 SPO 1997 10 03 07 42 310 3.0 -9 686.00 -39.0 -39.3 -39.0 74 -99 SPO 1997 10 03 07 43 309 3.4 -9 686.00 -39.0 -39.3 -39.0 74 -99 SPO 1997 10 03 07 44 310 3.2 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 45 312 3.1 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 46 314 3.3 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 47 315 3.4 -9 685.90 -39.0 -39.1 -39.0 75 -99 SPO 1997 10 03 07 48 313 3.5 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 49 311 3.6 -9 685.80 -39.0 -39.2 -39.1 74 -99 SPO 1997 10 03 07 50 311 3.6 -9 685.80 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 51 314 3.3 -9 685.80 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 52 316 3.2 -9 685.80 -39.0 -39.1 -39.0 74 -99 SPO 1997 10 03 07 53 315 3.1 -9 685.80 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 54 316 3.0 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 55 314 3.4 -9 685.90 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 07 56 315 3.0 -9 685.90 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 07 57 319 2.9 -9 685.90 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 07 58 318 3.1 -9 685.90 -39.0 -39.2 -39.0 74 -99 SPO 1997 10 03 07 59 320 3.2 -9 685.90 -39.0 -39.2 -39.0 75 -99 SPO 1997 10 03 08 00 321 3.1 -9 685.90 -39.0 -39.2 -39.0 75 0 SPO 1997 10 03 08 01 326 2.9 -9 685.90 -39.0 -39.1 -39.0 75 -99 SPO 1997 10 03 08 02 329 2.8 -9 685.90 -39.0 -38.9 -39.0 75 -99 SPO 1997 10 03 08 03 325 2.7 -9 685.90 -39.0 -39.0 -39.0 74 -99 SPO 1997 10 03 08 04 326 2.8 -9 685.90 -39.0 -39.1 -39.0 72 -99 SPO 1997 10 03 08 05 324 2.9 -9 685.90 -39.0 -39.1 -39.0 72 -99 SPO 1997 10 03 08 06 326 3.1 -9 685.90 -39.0 -39.0 -39.0 74 -99 SPO 1997 10 03 08 07 326 3.2 -9 685.90 -39.0 -38.9 -39.0 72 -99 SPO 1997 10 03 08 08 326 3.1 -9 685.80 -39.0 -38.9 -39.0 72 -99 SPO 1997 10 03 08 09 325 3.2 -9 685.80 -39.0 -38.9 -39.0 72 -99 SPO 1997 10 03 08 10 328 3.3 -9 685.80 -39.0 -38.7 -39.0 72 -99 SPO 1997 10 03 08 11 326 3.5 -9 685.80 -39.0 -38.4 -39.0 72 -99 SPO 1997 10 03 08 12 325 3.6 -9 685.80 -39.0 -38.6 -39.0 71 -99 SPO 1997 10 03 08 13 325 3.5 -9 685.80 -39.0 -38.8 -39.1 71 -99 SPO 1997 10 03 08 14 324 3.7 -9 685.80 -39.0 -38.9 -39.1 72 -99 SPO 1997 10 03 08 15 324 3.9 -9 685.80 -39.0 -38.9 -39.0 72 -99 SPO 1997 10 03 08 16 326 3.7 -9 685.80 -39.2 -39.1 -39.1 74 -99 SPO 1997 10 03 08 17 324 3.6 -9 685.70 -39.2 -39.1 -39.1 73 -99 SPO 1997 10 03 08 18 326 3.6 -9 685.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 10 03 08 19 326 3.6 -9 685.70 -39.2 -39.1 -39.2 72 -99 SPO 1997 10 03 08 20 326 3.6 -9 685.70 -39.4 -38.9 -39.2 74 -99 SPO 1997 10 03 08 21 326 3.6 -9 685.70 -39.4 -38.6 -39.2 74 -99 SPO 1997 10 03 08 22 325 3.9 -9 685.70 -39.4 -38.6 -39.3 73 -99 SPO 1997 10 03 08 23 326 3.7 -9 685.70 -39.4 -38.7 -39.3 73 -99 SPO 1997 10 03 08 24 330 3.6 -9 685.70 -39.5 -38.9 -39.3 74 -99 SPO 1997 10 03 08 25 334 3.6 -9 685.70 -39.5 -39.0 -39.3 73 -99 SPO 1997 10 03 08 26 336 3.9 -9 685.70 -39.5 -39.0 -39.4 72 -99 SPO 1997 10 03 08 27 336 3.8 -9 685.70 -39.5 -38.9 -39.4 72 -99 SPO 1997 10 03 08 28 338 3.8 -9 685.60 -39.5 -39.0 -39.4 71 -99 SPO 1997 10 03 08 29 335 3.9 -9 685.70 -39.5 -39.0 -39.4 70 -99 SPO 1997 10 03 08 30 336 3.7 -9 685.70 -39.5 -38.9 -39.5 71 -99 SPO 1997 10 03 08 31 333 3.5 -9 685.70 -39.5 -39.1 -39.5 72 -99 SPO 1997 10 03 08 32 332 3.7 -9 685.70 -39.7 -39.1 -39.5 73 -99 SPO 1997 10 03 08 33 332 3.9 -9 685.60 -39.7 -39.0 -39.5 72 -99 SPO 1997 10 03 08 34 336 4.2 -9 685.60 -39.7 -38.9 -39.5 72 -99 SPO 1997 10 03 08 35 332 4.0 -9 685.60 -39.7 -39.0 -39.5 72 -99 SPO 1997 10 03 08 36 332 3.9 -9 685.60 -39.7 -39.3 -39.6 72 -99 SPO 1997 10 03 08 37 330 3.8 -9 685.60 -39.7 -39.4 -39.6 72 -99 SPO 1997 10 03 08 38 330 3.7 -9 685.60 -39.7 -39.5 -39.6 72 -99 SPO 1997 10 03 08 39 331 3.6 -9 685.60 -39.7 -39.3 -39.6 72 -99 SPO 1997 10 03 08 40 327 3.7 -9 685.60 -39.7 -39.2 -39.6 72 -99 SPO 1997 10 03 08 41 327 3.6 -9 685.60 -39.5 -39.2 -39.5 71 -99 SPO 1997 10 03 08 42 324 3.7 -9 685.60 -39.5 -39.2 -39.5 71 -99 SPO 1997 10 03 08 43 324 3.6 -9 685.60 -39.5 -39.2 -39.5 71 -99 SPO 1997 10 03 08 44 325 3.7 -9 685.60 -39.5 -39.2 -39.5 71 -99 SPO 1997 10 03 08 45 328 3.9 -9 685.60 -39.5 -39.3 -39.5 71 -99 SPO 1997 10 03 08 46 330 4.0 -9 685.50 -39.5 -39.4 -39.5 72 -99 SPO 1997 10 03 08 47 328 4.1 -9 685.50 -39.5 -39.4 -39.6 72 -99 SPO 1997 10 03 08 48 329 4.1 -9 685.50 -39.5 -39.5 -39.6 72 -99 SPO 1997 10 03 08 49 327 4.1 -9 685.50 -39.7 -39.2 -39.6 73 -99 SPO 1997 10 03 08 50 324 3.9 -9 685.50 -39.7 -39.1 -39.6 72 -99 SPO 1997 10 03 08 51 320 4.1 -9 685.50 -39.7 -38.8 -39.6 72 -99 SPO 1997 10 03 08 52 320 3.9 -9 685.50 -39.5 -38.7 -39.6 71 -99 SPO 1997 10 03 08 53 321 4.0 -9 685.50 -39.5 -39.0 -39.5 72 -99 SPO 1997 10 03 08 54 324 3.7 -9 685.50 -39.5 -39.3 -39.5 72 -99 SPO 1997 10 03 08 55 325 3.9 -9 685.50 -39.5 -39.4 -39.6 73 -99 SPO 1997 10 03 08 56 327 4.2 -9 685.50 -39.5 -39.4 -39.6 73 -99 SPO 1997 10 03 08 57 328 4.4 -9 685.50 -39.5 -39.3 -39.5 73 -99 SPO 1997 10 03 08 58 328 4.2 -9 685.50 -39.5 -39.4 -39.5 72 -99 SPO 1997 10 03 08 59 329 4.2 -9 685.40 -39.5 -39.4 -39.5 71 -99 SPO 1997 10 03 09 00 327 4.0 -9 685.40 -39.5 -39.3 -39.5 71 0 SPO 1997 10 03 09 01 327 3.9 -9 685.50 -39.5 -39.0 -39.4 72 -99 SPO 1997 10 03 09 02 326 4.0 -9 685.50 -39.4 -39.2 -39.4 72 -99 SPO 1997 10 03 09 03 326 4.0 -9 685.50 -39.4 -39.3 -39.4 72 -99 SPO 1997 10 03 09 04 327 3.7 -9 685.50 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 05 327 3.9 -9 685.50 -39.4 -39.5 -39.4 72 -99 SPO 1997 10 03 09 06 329 3.9 -9 685.40 -39.4 -39.5 -39.4 72 -99 SPO 1997 10 03 09 07 328 4.0 -9 685.40 -39.4 -39.6 -39.4 72 -99 SPO 1997 10 03 09 08 329 3.7 -9 685.40 -39.5 -39.6 -39.4 73 -99 SPO 1997 10 03 09 09 329 3.9 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 10 329 3.8 -9 685.40 -39.4 -39.5 -39.4 72 -99 SPO 1997 10 03 09 11 326 3.9 -9 685.40 -39.4 -39.6 -39.4 72 -99 SPO 1997 10 03 09 12 327 4.3 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 13 327 4.0 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 14 325 4.1 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 15 323 4.2 -9 685.40 -39.4 -39.3 -39.4 72 -99 SPO 1997 10 03 09 16 322 4.1 -9 685.40 -39.4 -39.3 -39.4 72 -99 SPO 1997 10 03 09 17 323 4.2 -9 685.40 -39.4 -39.3 -39.4 72 -99 SPO 1997 10 03 09 18 321 4.2 -9 685.50 -39.4 -39.4 -39.4 73 -99 SPO 1997 10 03 09 19 320 4.0 -9 685.50 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 20 321 4.0 -9 685.50 -39.4 -39.2 -39.4 73 -99 SPO 1997 10 03 09 21 321 4.1 -9 685.50 -39.4 -39.3 -39.4 73 -99 SPO 1997 10 03 09 22 321 3.9 -9 685.40 -39.4 -39.3 -39.4 74 -99 SPO 1997 10 03 09 23 320 3.9 -9 685.40 -39.4 -39.4 -39.4 73 -99 SPO 1997 10 03 09 24 320 3.8 -9 685.40 -39.4 -39.4 -39.4 73 -99 SPO 1997 10 03 09 25 323 3.8 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 26 323 3.6 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 27 323 3.8 -9 685.40 -39.4 -39.5 -39.4 72 -99 SPO 1997 10 03 09 28 322 4.3 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 29 324 4.0 -9 685.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 10 03 09 30 323 4.0 -9 685.40 -39.4 -39.5 -39.4 72 -99 SPO 1997 10 03 09 31 325 4.0 -9 685.40 -39.5 -39.4 -39.4 72 -99 SPO 1997 10 03 09 32 326 4.2 -9 685.40 -39.5 -39.3 -39.4 73 -99 SPO 1997 10 03 09 33 326 4.1 -9 685.40 -39.5 -39.5 -39.4 73 -99 SPO 1997 10 03 09 34 328 4.1 -9 685.40 -39.5 -39.4 -39.5 73 -99 SPO 1997 10 03 09 35 329 4.0 -9 685.40 -39.5 -39.4 -39.5 72 -99 SPO 1997 10 03 09 36 328 4.0 -9 685.40 -39.5 -39.5 -39.5 72 -99 SPO 1997 10 03 09 37 328 4.4 -9 685.40 -39.5 -39.5 -39.5 72 -99 SPO 1997 10 03 09 38 328 4.3 -9 685.40 -39.5 -39.5 -39.5 72 -99 SPO 1997 10 03 09 39 327 4.4 -9 685.40 -39.5 -39.5 -39.5 71 -99 SPO 1997 10 03 09 40 327 4.2 -9 685.40 -39.5 -39.5 -39.5 71 -99 SPO 1997 10 03 09 41 327 4.2 -9 685.40 -39.5 -39.5 -39.5 71 -99 SPO 1997 10 03 09 42 327 4.0 -9 685.40 -39.5 -39.5 -39.5 72 -99 SPO 1997 10 03 09 43 329 4.2 -9 685.40 -39.5 -39.4 -39.5 72 -99 SPO 1997 10 03 09 44 328 4.1 -9 685.40 -39.5 -39.6 -39.5 72 -99 SPO 1997 10 03 09 45 327 3.9 -9 685.40 -39.5 -39.6 -39.5 72 -99 SPO 1997 10 03 09 46 329 3.9 -9 685.40 -39.5 -39.6 -39.5 71 -99 SPO 1997 10 03 09 47 330 3.8 -9 685.40 -39.5 -39.6 -39.4 71 -99 SPO 1997 10 03 09 48 331 3.9 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 49 333 3.8 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 50 333 3.7 -9 685.40 -39.5 -39.7 -39.4 72 -99 SPO 1997 10 03 09 51 334 3.7 -9 685.40 -39.5 -39.7 -39.4 72 -99 SPO 1997 10 03 09 52 333 4.1 -9 685.40 -39.5 -39.6 -39.4 73 -99 SPO 1997 10 03 09 53 332 4.0 -9 685.40 -39.5 -39.7 -39.4 73 -99 SPO 1997 10 03 09 54 334 4.0 -9 685.40 -39.5 -39.6 -39.4 73 -99 SPO 1997 10 03 09 55 335 3.9 -9 685.40 -39.5 -39.6 -39.4 73 -99 SPO 1997 10 03 09 56 336 4.0 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 57 337 4.0 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 58 338 3.8 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 09 59 336 3.8 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 10 00 334 4.1 -9 685.40 -39.5 -39.6 -39.4 71 0 SPO 1997 10 03 10 01 332 4.1 -9 685.40 -39.5 -39.6 -39.4 71 -99 SPO 1997 10 03 10 02 332 4.0 -9 685.40 -39.5 -39.6 -39.4 72 -99 SPO 1997 10 03 10 03 332 4.0 -9 685.40 -39.5 -39.7 -39.4 72 -99 SPO 1997 10 03 10 04 331 4.0 -9 685.40 -39.5 -39.7 -39.4 72 -99 SPO 1997 10 03 10 05 331 4.3 -9 685.40 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 06 330 4.3 -9 685.40 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 07 330 4.2 -9 685.40 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 08 330 4.2 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 09 329 4.5 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 10 329 4.5 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 11 330 4.6 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 12 330 4.6 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 13 328 4.5 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 14 327 4.5 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 15 326 4.8 -9 685.20 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 16 326 4.7 -9 685.20 -39.5 -39.6 -39.5 72 -99 SPO 1997 10 03 10 17 326 4.7 -9 685.20 -39.5 -39.6 -39.5 71 -99 SPO 1997 10 03 10 18 324 4.6 -9 685.20 -39.5 -39.6 -39.5 71 -99 SPO 1997 10 03 10 19 323 4.6 -9 685.20 -39.5 -39.7 -39.5 71 -99 SPO 1997 10 03 10 20 324 4.5 -9 685.20 -39.5 -39.7 -39.6 71 -99 SPO 1997 10 03 10 21 324 4.5 -9 685.20 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 10 22 323 4.5 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 23 323 4.5 -9 685.30 -39.5 -39.8 -39.5 72 -99 SPO 1997 10 03 10 24 324 4.3 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 25 322 4.2 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 26 322 4.2 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 27 321 4.2 -9 685.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 10 28 318 3.9 -9 685.30 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 10 29 320 4.4 -9 685.20 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 10 30 319 4.3 -9 685.20 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 10 31 319 4.4 -9 685.20 -39.5 -39.7 -39.6 71 -99 SPO 1997 10 03 10 32 320 4.4 -9 685.20 -39.5 -39.7 -39.6 71 -99 SPO 1997 10 03 10 33 321 4.7 -9 685.10 -39.5 -39.8 -39.6 71 -99 SPO 1997 10 03 10 34 321 4.4 -9 685.10 -39.5 -39.8 -39.6 71 -99 SPO 1997 10 03 10 35 321 4.5 -9 685.20 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 10 36 320 4.0 -9 685.20 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 10 37 320 4.1 -9 685.20 -39.7 -39.8 -39.7 74 -99 SPO 1997 10 03 10 38 321 4.2 -9 685.20 -39.7 -39.8 -39.7 74 -99 SPO 1997 10 03 10 39 321 4.2 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 40 320 4.1 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 41 321 4.1 -9 685.20 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 42 321 4.0 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 43 321 4.3 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 44 321 4.4 -9 685.10 -39.7 -39.8 -39.7 73 -99 SPO 1997 10 03 10 45 319 4.5 -9 685.10 -39.7 -39.8 -39.7 73 -99 SPO 1997 10 03 10 46 318 4.4 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 47 317 4.6 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 48 317 4.4 -9 685.10 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 10 49 314 3.7 -9 685.20 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 10 50 308 3.4 -9 685.30 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 10 51 314 3.4 -9 685.30 -39.7 -39.9 -39.7 73 -99 SPO 1997 10 03 10 52 311 3.7 -9 685.20 -39.7 -39.9 -39.7 73 -99 SPO 1997 10 03 10 53 316 3.9 -9 685.20 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 10 54 311 3.9 -9 685.20 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 55 311 3.8 -9 685.20 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 10 56 313 3.8 -9 685.20 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 57 316 3.9 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 58 318 4.1 -9 685.00 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 10 59 317 4.3 -9 685.00 -39.7 -39.8 -39.7 73 -99 SPO 1997 10 03 11 00 314 4.2 -9 685.00 -39.7 -39.8 -39.7 73 0 SPO 1997 10 03 11 01 311 3.9 -9 685.10 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 02 311 4.0 -9 685.10 -39.5 -39.8 -39.7 70 -99 SPO 1997 10 03 11 03 310 4.0 -9 685.10 -39.5 -39.8 -39.7 70 -99 SPO 1997 10 03 11 04 310 3.8 -9 685.10 -39.5 -39.8 -39.7 71 -99 SPO 1997 10 03 11 05 312 3.5 -9 685.10 -39.5 -39.9 -39.6 71 -99 SPO 1997 10 03 11 06 313 3.5 -9 685.10 -39.5 -39.9 -39.7 72 -99 SPO 1997 10 03 11 07 314 3.3 -9 685.10 -39.5 -39.9 -39.7 72 -99 SPO 1997 10 03 11 08 317 3.6 -9 685.00 -39.7 -39.9 -39.6 74 -99 SPO 1997 10 03 11 09 316 3.9 -9 685.00 -39.7 -39.9 -39.6 74 -99 SPO 1997 10 03 11 10 315 3.5 -9 685.10 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 03 11 11 316 3.4 -9 685.10 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 03 11 12 317 4.0 -9 685.00 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 03 11 13 316 4.1 -9 685.00 -39.7 -39.9 -39.7 74 -99 SPO 1997 10 03 11 14 315 3.9 -9 685.00 -39.7 -39.9 -39.7 73 -99 SPO 1997 10 03 11 15 314 3.9 -9 685.00 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 16 312 3.7 -9 685.00 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 17 313 3.7 -9 685.00 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 18 310 3.8 -9 685.00 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 19 307 3.6 -9 685.00 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 20 311 3.8 -9 685.00 -39.5 -39.9 -39.7 71 -99 SPO 1997 10 03 11 21 312 3.8 -9 685.00 -39.5 -39.9 -39.7 72 -99 SPO 1997 10 03 11 22 311 3.8 -9 685.00 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 23 306 3.5 -9 685.00 -39.5 -39.8 -39.6 71 -99 SPO 1997 10 03 11 24 315 3.7 -9 685.00 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 25 312 3.7 -9 685.00 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 26 312 4.0 -9 684.90 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 27 317 4.1 -9 684.90 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 28 314 3.6 -9 684.90 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 29 312 3.5 -9 685.00 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 30 317 3.9 -9 684.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 31 319 3.7 -9 684.80 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 32 321 3.4 -9 684.80 -39.5 -39.8 -39.6 72 -99 SPO 1997 10 03 11 33 320 3.4 -9 684.90 -39.5 -39.6 -39.6 72 -99 SPO 1997 10 03 11 34 320 3.6 -9 684.80 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 35 322 4.1 -9 684.80 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 36 323 4.2 -9 684.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 37 323 4.1 -9 684.70 -39.5 -39.6 -39.6 72 -99 SPO 1997 10 03 11 38 323 4.0 -9 684.70 -39.5 -39.6 -39.6 72 -99 SPO 1997 10 03 11 39 319 3.9 -9 684.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 40 322 3.5 -9 684.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 41 325 3.5 -9 684.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 11 42 325 3.4 -9 684.70 -39.7 -39.7 -39.6 73 -99 SPO 1997 10 03 11 43 324 3.6 -9 684.70 -39.7 -39.8 -39.6 72 -99 SPO 1997 10 03 11 44 322 3.9 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 45 322 3.9 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 46 323 3.6 -9 684.70 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 47 325 3.8 -9 684.70 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 48 326 3.9 -9 684.70 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 49 327 3.8 -9 684.70 -39.7 -39.9 -39.7 71 -99 SPO 1997 10 03 11 50 329 3.8 -9 684.70 -39.7 -39.9 -39.7 71 -99 SPO 1997 10 03 11 51 333 4.1 -9 684.60 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 52 327 3.9 -9 684.60 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 53 322 3.8 -9 684.70 -39.7 -39.9 -39.7 72 -99 SPO 1997 10 03 11 54 319 3.5 -9 684.80 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 55 318 3.4 -9 684.80 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 56 319 3.5 -9 684.70 -39.7 -39.9 -39.7 73 -99 SPO 1997 10 03 11 57 320 3.8 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 11 58 323 3.4 -9 684.70 -39.7 -39.8 -39.7 73 -99 SPO 1997 10 03 11 59 327 3.7 -9 684.70 -39.7 -39.8 -39.7 73 -99 SPO 1997 10 03 12 00 330 3.7 -9 684.70 -39.7 -39.9 -39.7 73 0 SPO 1997 10 03 12 01 328 3.6 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 12 02 326 3.6 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 12 03 324 3.5 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 12 04 323 3.5 -9 684.70 -39.7 -39.7 -39.7 71 -99 SPO 1997 10 03 12 05 322 3.8 -9 684.70 -39.7 -39.8 -39.7 71 -99 SPO 1997 10 03 12 06 324 3.7 -9 684.70 -39.7 -39.8 -39.7 71 -99 SPO 1997 10 03 12 07 325 3.5 -9 684.70 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 12 08 322 3.6 -9 684.60 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 12 09 323 3.9 -9 684.60 -39.7 -39.8 -39.7 72 -99 SPO 1997 10 03 12 10 322 3.7 -9 684.60 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 11 321 3.5 -9 684.60 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 12 316 3.3 -9 684.70 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 13 315 3.1 -9 684.70 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 14 309 2.7 -9 684.80 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 12 15 307 2.5 -9 684.80 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 03 12 16 310 2.3 -9 684.80 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 03 12 17 313 2.7 -9 684.80 -39.7 -39.9 -39.8 73 -99 SPO 1997 10 03 12 18 313 2.6 -9 684.80 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 19 302 2.5 -9 684.80 -39.7 -39.8 -39.8 71 -99 SPO 1997 10 03 12 20 302 2.7 -9 684.80 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 12 21 300 2.8 -9 684.80 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 12 22 300 2.8 -9 684.80 -39.7 -39.9 -39.8 72 -99 SPO 1997 10 03 12 23 301 2.8 -9 684.80 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 24 303 2.8 -9 684.70 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 12 25 300 2.5 -9 684.80 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 26 293 2.3 -9 684.80 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 27 292 2.5 -9 684.80 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 28 291 2.5 -9 684.90 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 29 291 2.4 -9 684.90 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 30 300 2.5 -9 684.80 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 12 31 307 3.0 -9 684.70 -39.9 -39.7 -39.8 74 -99 SPO 1997 10 03 12 32 304 2.9 -9 684.70 -39.9 -39.7 -39.8 74 -99 SPO 1997 10 03 12 33 292 2.4 -9 684.80 -39.9 -39.8 -39.8 74 -99 SPO 1997 10 03 12 34 283 2.3 -9 684.90 -39.9 -39.8 -39.8 74 -99 SPO 1997 10 03 12 35 293 2.6 -9 684.80 -39.9 -39.7 -39.8 73 -99 SPO 1997 10 03 12 36 293 2.7 -9 684.80 -39.9 -39.7 -39.8 72 -99 SPO 1997 10 03 12 37 291 2.7 -9 684.80 -39.9 -39.7 -39.8 72 -99 SPO 1997 10 03 12 38 301 3.0 -9 684.70 -40.0 -39.7 -39.9 73 -99 SPO 1997 10 03 12 39 302 3.2 -9 684.60 -40.0 -39.7 -39.9 74 -99 SPO 1997 10 03 12 40 290 2.8 -9 684.70 -40.0 -39.7 -39.9 74 -99 SPO 1997 10 03 12 41 283 2.6 -9 684.80 -40.0 -39.8 -39.9 73 -99 SPO 1997 10 03 12 42 294 2.9 -9 684.70 -39.9 -39.7 -39.9 72 -99 SPO 1997 10 03 12 43 298 3.3 -9 684.60 -40.0 -39.7 -39.9 73 -99 SPO 1997 10 03 12 44 292 3.0 -9 684.70 -40.0 -39.7 -39.9 74 -99 SPO 1997 10 03 12 45 292 2.9 -9 684.70 -40.0 -39.7 -39.9 73 -99 SPO 1997 10 03 12 46 288 2.8 -9 684.70 -40.0 -39.7 -39.9 73 -99 SPO 1997 10 03 12 47 283 2.9 -9 684.70 -40.0 -39.7 -40.0 74 -99 SPO 1997 10 03 12 48 288 2.9 -9 684.70 -40.0 -39.7 -40.0 73 -99 SPO 1997 10 03 12 49 288 2.9 -9 684.70 -40.0 -39.7 -40.0 72 -99 SPO 1997 10 03 12 50 289 3.2 -9 684.60 -40.0 -39.7 -40.0 72 -99 SPO 1997 10 03 12 51 292 3.3 -9 684.60 -40.0 -39.6 -39.9 72 -99 SPO 1997 10 03 12 52 294 3.6 -9 684.50 -40.0 -39.5 -40.0 72 -99 SPO 1997 10 03 12 53 295 3.4 -9 684.50 -40.0 -39.4 -40.0 71 -99 SPO 1997 10 03 12 54 287 2.8 -9 684.60 -40.0 -39.5 -40.0 71 -99 SPO 1997 10 03 12 55 285 2.8 -9 684.70 -40.0 -39.5 -40.0 71 -99 SPO 1997 10 03 12 56 294 3.2 -9 684.60 -40.0 -39.5 -40.0 72 -99 SPO 1997 10 03 12 57 293 3.2 -9 684.60 -40.0 -39.5 -40.1 73 -99 SPO 1997 10 03 12 58 284 2.8 -9 684.60 -40.0 -39.6 -40.1 72 -99 SPO 1997 10 03 12 59 291 3.1 -9 684.50 -40.0 -39.6 -40.0 72 -99 SPO 1997 10 03 13 00 291 3.2 -9 684.50 -40.2 -39.6 -40.1 74 0 SPO 1997 10 03 13 01 286 3.0 -9 684.50 -40.0 -39.6 -40.1 72 -99 SPO 1997 10 03 13 02 284 3.0 -9 684.60 -40.0 -39.5 -40.0 72 -99 SPO 1997 10 03 13 03 281 2.8 -9 684.60 -40.2 -39.5 -40.1 73 -99 SPO 1997 10 03 13 04 287 3.1 -9 684.50 -40.2 -39.5 -40.1 73 -99 SPO 1997 10 03 13 05 289 3.3 -9 684.50 -40.2 -39.5 -40.1 73 -99 SPO 1997 10 03 13 06 288 3.2 -9 684.40 -40.2 -39.5 -40.1 73 -99 SPO 1997 10 03 13 07 290 3.1 -9 684.40 -40.2 -39.5 -40.1 73 -99 SPO 1997 10 03 13 08 285 2.8 -9 684.50 -40.0 -39.5 -40.1 71 -99 SPO 1997 10 03 13 09 291 2.8 -9 684.50 -40.0 -39.5 -40.1 71 -99 SPO 1997 10 03 13 10 295 2.7 -9 684.50 -40.2 -39.6 -40.1 73 -99 SPO 1997 10 03 13 11 296 2.7 -9 684.50 -40.2 -39.6 -40.1 73 -99 SPO 1997 10 03 13 12 298 2.5 -9 684.40 -40.2 -39.7 -40.1 73 -99 SPO 1997 10 03 13 13 303 2.6 -9 684.40 -40.2 -39.7 -40.1 74 -99 SPO 1997 10 03 13 14 304 2.5 -9 684.40 -40.2 -39.7 -40.1 74 -99 SPO 1997 10 03 13 15 308 2.4 -9 684.30 -40.2 -39.7 -40.1 73 -99 SPO 1997 10 03 13 16 311 2.5 -9 684.30 -40.2 -39.7 -40.1 73 -99 SPO 1997 10 03 13 17 314 2.5 -9 684.30 -40.2 -39.7 -40.1 73 -99 SPO 1997 10 03 13 18 312 2.5 -9 684.30 -40.2 -39.7 -40.1 74 -99 SPO 1997 10 03 13 19 312 2.5 -9 684.30 -40.2 -39.7 -40.1 74 -99 SPO 1997 10 03 13 20 309 2.4 -9 684.30 -40.2 -39.6 -40.1 74 -99 SPO 1997 10 03 13 21 306 2.4 -9 684.30 -40.2 -39.6 -40.1 75 -99 SPO 1997 10 03 13 22 311 2.4 -9 684.20 -40.2 -39.6 -40.1 75 -99 SPO 1997 10 03 13 23 313 2.6 -9 684.20 -40.2 -39.4 -40.1 75 -99 SPO 1997 10 03 13 24 309 2.7 -9 684.20 -40.2 -39.6 -40.1 75 -99 SPO 1997 10 03 13 25 304 2.7 -9 684.20 -40.2 -39.5 -40.2 73 -99 SPO 1997 10 03 13 26 300 2.5 -9 684.20 -40.2 -39.5 -40.2 72 -99 SPO 1997 10 03 13 27 300 2.6 -9 684.20 -40.2 -39.5 -40.2 72 -99 SPO 1997 10 03 13 28 296 2.7 -9 684.30 -40.2 -39.6 -40.1 72 -99 SPO 1997 10 03 13 29 291 2.6 -9 684.30 -40.2 -39.7 -40.1 72 -99 SPO 1997 10 03 13 30 282 2.8 -9 684.40 -40.2 -39.7 -40.1 73 -99 SPO 1997 10 03 13 31 279 2.7 -9 684.40 -40.2 -39.8 -40.1 74 -99 SPO 1997 10 03 13 32 284 2.7 -9 684.30 -40.2 -39.8 -40.2 73 -99 SPO 1997 10 03 13 33 285 2.8 -9 684.30 -40.2 -39.8 -40.1 73 -99 SPO 1997 10 03 13 34 282 3.0 -9 684.40 -40.2 -39.8 -40.2 73 -99 SPO 1997 10 03 13 35 277 3.3 -9 684.40 -40.2 -39.8 -40.1 72 -99 SPO 1997 10 03 13 36 278 3.5 -9 684.40 -40.2 -39.8 -40.2 72 -99 SPO 1997 10 03 13 37 277 3.6 -9 684.40 -40.4 -39.7 -40.2 74 -99 SPO 1997 10 03 13 38 275 3.6 -9 684.40 -40.4 -39.8 -40.4 74 -99 SPO 1997 10 03 13 39 276 3.5 -9 684.40 -40.5 -39.8 -40.4 74 -99 SPO 1997 10 03 13 40 273 3.5 -9 684.40 -40.5 -39.8 -40.5 74 -99 SPO 1997 10 03 13 41 271 3.5 -9 684.40 -40.7 -39.8 -40.5 74 -99 SPO 1997 10 03 13 42 266 3.4 -9 684.40 -40.7 -39.8 -40.6 71 -99 SPO 1997 10 03 13 43 257 3.5 -9 684.60 -40.7 -39.8 -40.5 71 -99 SPO 1997 10 03 13 44 260 3.4 -9 684.50 -40.5 -39.8 -40.5 69 -99 SPO 1997 10 03 13 45 259 3.6 -9 684.50 -40.5 -39.7 -40.5 69 -99 SPO 1997 10 03 13 46 256 3.8 -9 684.50 -40.7 -39.8 -40.6 71 -99 SPO 1997 10 03 13 47 265 3.3 -9 684.40 -40.7 -39.8 -40.6 71 -99 SPO 1997 10 03 13 48 272 3.1 -9 684.30 -40.5 -39.7 -40.6 70 -99 SPO 1997 10 03 13 49 256 3.7 -9 684.50 -40.5 -39.7 -40.5 71 -99 SPO 1997 10 03 13 50 261 3.5 -9 684.50 -40.5 -39.8 -40.5 71 -99 SPO 1997 10 03 13 51 259 3.3 -9 684.50 -40.5 -39.8 -40.5 70 -99 SPO 1997 10 03 13 52 264 3.4 -9 684.50 -40.4 -39.9 -40.4 71 -99 SPO 1997 10 03 13 53 267 3.0 -9 684.40 -40.4 -39.9 -40.4 71 -99 SPO 1997 10 03 13 54 277 2.7 -9 684.30 -40.2 -40.0 -40.3 71 -99 SPO 1997 10 03 13 55 277 2.5 -9 684.30 -40.2 -40.0 -40.3 71 -99 SPO 1997 10 03 13 56 280 2.4 -9 684.30 -40.2 -40.0 -40.3 71 -99 SPO 1997 10 03 13 57 282 2.1 -9 684.30 -40.2 -40.0 -40.2 72 -99 SPO 1997 10 03 13 58 286 2.1 -9 684.20 -40.2 -40.0 -40.2 72 -99 SPO 1997 10 03 13 59 283 2.2 -9 684.20 -40.2 -40.0 -40.2 71 -99 SPO 1997 10 03 14 00 280 2.2 -9 684.20 -40.2 -40.0 -40.2 71 0 SPO 1997 10 03 14 01 281 2.2 -9 684.20 -40.2 -40.0 -40.2 71 -99 SPO 1997 10 03 14 02 267 2.3 -9 684.30 -40.2 -40.0 -40.2 72 -99 SPO 1997 10 03 14 03 260 2.4 -9 684.40 -40.2 -39.9 -40.2 73 -99 SPO 1997 10 03 14 04 265 2.2 -9 684.40 -40.2 -39.9 -40.2 73 -99 SPO 1997 10 03 14 05 263 2.3 -9 684.40 -40.2 -40.0 -40.2 72 -99 SPO 1997 10 03 14 06 272 2.1 -9 684.30 -40.2 -39.9 -40.2 71 -99 SPO 1997 10 03 14 07 271 2.2 -9 684.30 -40.2 -40.0 -40.2 72 -99 SPO 1997 10 03 14 08 276 2.0 -9 684.20 -40.2 -39.9 -40.2 72 -99 SPO 1997 10 03 14 09 277 2.1 -9 684.20 -40.2 -39.8 -40.2 72 -99 SPO 1997 10 03 14 10 277 2.2 -9 684.20 -40.2 -39.8 -40.2 73 -99 SPO 1997 10 03 14 11 280 2.2 -9 684.20 -40.2 -39.8 -40.2 72 -99 SPO 1997 10 03 14 12 278 2.4 -9 684.20 -40.2 -39.8 -40.1 73 -99 SPO 1997 10 03 14 13 278 2.4 -9 684.20 -40.2 -39.8 -40.1 74 -99 SPO 1997 10 03 14 14 273 2.5 -9 684.20 -40.2 -39.8 -40.1 75 -99 SPO 1997 10 03 14 15 270 2.7 -9 684.20 -40.0 -39.8 -40.1 73 -99 SPO 1997 10 03 14 16 270 2.9 -9 684.20 -40.0 -39.9 -40.1 71 -99 SPO 1997 10 03 14 17 269 3.0 -9 684.20 -40.0 -39.9 -40.1 71 -99 SPO 1997 10 03 14 18 266 3.0 -9 684.20 -40.0 -39.8 -40.0 71 -99 SPO 1997 10 03 14 19 268 2.9 -9 684.20 -40.0 -39.8 -40.0 71 -99 SPO 1997 10 03 14 20 273 2.4 -9 684.20 -40.0 -39.8 -40.0 71 -99 SPO 1997 10 03 14 21 274 2.4 -9 684.20 -40.0 -39.8 -40.0 72 -99 SPO 1997 10 03 14 22 273 2.2 -9 684.20 -40.0 -39.8 -39.9 73 -99 SPO 1997 10 03 14 23 273 2.0 -9 684.20 -39.9 -39.8 -39.9 72 -99 SPO 1997 10 03 14 24 272 2.1 -9 684.20 -39.9 -39.8 -39.9 73 -99 SPO 1997 10 03 14 25 274 1.9 -9 684.20 -39.7 -39.8 -39.8 72 -99 SPO 1997 10 03 14 26 276 1.9 -9 684.10 -39.9 -39.8 -39.8 74 -99 SPO 1997 10 03 14 27 277 2.0 -9 684.10 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 14 28 278 2.1 -9 684.10 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 14 29 283 2.1 -9 684.10 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 14 30 281 2.0 -9 684.10 -39.7 -39.7 -39.8 72 -99 SPO 1997 10 03 14 31 277 1.9 -9 684.10 -39.7 -39.7 -39.7 72 -99 SPO 1997 10 03 14 32 283 1.7 -9 684.00 -39.7 -39.7 -39.7 72 -99 SPO 1997 10 03 14 33 282 1.9 -9 684.00 -39.7 -39.7 -39.7 74 -99 SPO 1997 10 03 14 34 280 2.0 -9 684.00 -39.7 -39.7 -39.7 74 -99 SPO 1997 10 03 14 35 281 2.2 -9 684.00 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 14 36 283 2.0 -9 684.00 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 14 37 286 2.1 -9 683.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 14 38 293 2.2 -9 683.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 14 39 296 1.9 -9 683.90 -39.5 -39.7 -39.6 72 -99 SPO 1997 10 03 14 40 296 1.8 -9 683.90 -39.5 -39.7 -39.5 72 -99 SPO 1997 10 03 14 41 287 1.9 -9 683.90 -39.5 -39.6 -39.5 72 -99 SPO 1997 10 03 14 42 282 1.8 -9 683.90 -39.5 -39.6 -39.5 72 -99 SPO 1997 10 03 14 43 283 1.9 -9 683.90 -39.5 -39.6 -39.5 73 -99 SPO 1997 10 03 14 44 283 1.9 -9 683.90 -39.5 -39.6 -39.4 74 -99 SPO 1997 10 03 14 45 279 2.0 -9 683.90 -39.5 -39.5 -39.4 74 -99 SPO 1997 10 03 14 46 275 2.5 -9 683.90 -39.4 -39.5 -39.4 74 -99 SPO 1997 10 03 14 47 276 2.5 -9 683.90 -39.4 -39.5 -39.4 74 -99 SPO 1997 10 03 14 48 274 2.5 -9 683.90 -39.4 -39.4 -39.4 74 -99 SPO 1997 10 03 14 49 273 2.4 -9 683.90 -39.4 -39.4 -39.4 74 -99 SPO 1997 10 03 14 50 271 2.5 -9 683.90 -39.4 -39.4 -39.4 74 -99 SPO 1997 10 03 14 51 269 2.3 -9 683.90 -39.2 -39.4 -39.3 72 -99 SPO 1997 10 03 14 52 272 2.3 -9 683.90 -39.2 -39.3 -39.3 71 -99 SPO 1997 10 03 14 53 270 2.2 -9 683.90 -39.2 -39.3 -39.2 71 -99 SPO 1997 10 03 14 54 270 2.4 -9 683.80 -39.2 -39.3 -39.2 71 -99 SPO 1997 10 03 14 55 269 2.4 -9 683.80 -39.2 -39.4 -39.2 72 -99 SPO 1997 10 03 14 56 267 2.7 -9 683.80 -39.0 -39.3 -39.2 72 -99 SPO 1997 10 03 14 57 265 2.6 -9 683.90 -39.0 -39.3 -39.1 72 -99 SPO 1997 10 03 14 58 263 2.9 -9 683.90 -39.0 -39.3 -39.1 72 -99 SPO 1997 10 03 14 59 262 3.1 -9 683.90 -39.0 -39.3 -39.1 72 -99 SPO 1997 10 03 15 00 263 3.1 -9 683.80 -39.0 -39.3 -39.1 72 0 SPO 1997 10 03 15 01 266 2.9 -9 683.80 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 15 02 268 2.7 -9 683.80 -39.0 -39.3 -39.0 72 -99 SPO 1997 10 03 15 03 268 2.6 -9 683.80 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 15 04 268 2.7 -9 683.80 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 15 05 265 3.1 -9 683.80 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 15 06 265 2.7 -9 683.80 -39.0 -39.2 -39.0 72 -99 SPO 1997 10 03 15 07 267 2.3 -9 683.80 -38.9 -39.2 -39.0 72 -99 SPO 1997 10 03 15 08 269 2.4 -9 683.80 -38.9 -39.2 -38.9 73 -99 SPO 1997 10 03 15 09 268 2.5 -9 683.80 -38.9 -39.2 -38.9 73 -99 SPO 1997 10 03 15 10 267 2.6 -9 683.80 -38.9 -39.1 -38.9 72 -99 SPO 1997 10 03 15 11 269 2.4 -9 683.70 -38.9 -39.1 -38.9 72 -99 SPO 1997 10 03 15 12 271 2.3 -9 683.70 -38.9 -39.1 -38.9 72 -99 SPO 1997 10 03 15 13 272 2.3 -9 683.70 -38.9 -39.1 -38.9 73 -99 SPO 1997 10 03 15 14 273 2.1 -9 683.70 -38.7 -39.1 -38.9 72 -99 SPO 1997 10 03 15 15 275 2.3 -9 683.60 -38.7 -39.1 -38.9 72 -99 SPO 1997 10 03 15 16 278 2.2 -9 683.60 -38.7 -39.1 -38.9 73 -99 SPO 1997 10 03 15 17 280 2.0 -9 683.60 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 18 281 2.1 -9 683.60 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 19 282 2.1 -9 683.60 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 20 288 2.2 -9 683.60 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 21 295 2.1 -9 683.60 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 22 302 2.0 -9 683.50 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 23 308 1.7 -9 683.50 -38.7 -39.1 -38.8 73 -99 SPO 1997 10 03 15 24 303 2.2 -9 683.50 -38.7 -39.0 -38.8 73 -99 SPO 1997 10 03 15 25 311 1.9 -9 683.50 -38.7 -39.0 -38.8 74 -99 SPO 1997 10 03 15 26 309 1.9 -9 683.50 -38.7 -39.0 -38.8 74 -99 SPO 1997 10 03 15 27 306 1.8 -9 683.50 -38.7 -39.0 -38.8 73 -99 SPO 1997 10 03 15 28 313 1.5 -9 683.60 -38.7 -39.0 -38.8 73 -99 SPO 1997 10 03 15 29 310 1.7 -9 683.50 -38.7 -39.0 -38.8 73 -99 SPO 1997 10 03 15 30 322 1.8 -9 683.50 -38.7 -39.0 -38.7 73 -99 SPO 1997 10 03 15 31 333 2.0 -9 683.50 -38.7 -39.0 -38.7 74 -99 SPO 1997 10 03 15 32 315 1.9 -9 683.50 -38.7 -38.9 -38.7 74 -99 SPO 1997 10 03 15 33 299 2.2 -9 683.60 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 15 34 308 2.2 -9 683.50 -38.9 -38.9 -38.8 75 -99 SPO 1997 10 03 15 35 314 2.2 -9 683.50 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 15 36 321 2.3 -9 683.40 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 15 37 318 2.5 -9 683.40 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 15 38 319 2.5 -9 683.40 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 15 39 324 2.6 -9 683.40 -38.9 -38.9 -38.8 75 -99 SPO 1997 10 03 15 40 327 2.6 -9 683.40 -38.9 -38.9 -38.7 75 -99 SPO 1997 10 03 15 41 328 2.7 -9 683.40 -38.9 -38.9 -38.7 74 -99 SPO 1997 10 03 15 42 327 2.5 -9 683.40 -38.9 -38.9 -38.7 75 -99 SPO 1997 10 03 15 43 317 2.2 -9 683.50 -38.9 -38.9 -38.8 75 -99 SPO 1997 10 03 15 44 315 2.2 -9 683.50 -38.9 -38.9 -38.8 75 -99 SPO 1997 10 03 15 45 313 2.2 -9 683.50 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 15 46 314 2.2 -9 683.40 -38.9 -38.9 -38.8 72 -99 SPO 1997 10 03 15 47 311 2.1 -9 683.40 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 15 48 281 1.7 -9 683.60 -38.9 -38.9 -38.9 74 -99 SPO 1997 10 03 15 49 278 1.9 -9 683.60 -38.9 -38.9 -38.8 74 -99 SPO 1997 10 03 15 50 301 2.3 -9 683.50 -38.9 -38.9 -38.8 74 -99 SPO 1997 10 03 15 51 292 2.1 -9 683.50 -38.9 -38.8 -38.8 74 -99 SPO 1997 10 03 15 52 292 1.9 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 53 309 2.2 -9 683.40 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 54 300 2.0 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 55 287 2.0 -9 683.60 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 56 303 2.0 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 57 300 1.9 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 58 294 1.9 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 15 59 287 2.1 -9 683.50 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 16 00 281 2.1 -9 683.60 -39.0 -38.8 -38.9 75 0 SPO 1997 10 03 16 01 274 2.2 -9 683.60 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 16 02 284 2.2 -9 683.60 -39.0 -38.8 -39.0 72 -99 SPO 1997 10 03 16 03 290 2.1 -9 683.60 -39.0 -38.8 -39.0 72 -99 SPO 1997 10 03 16 04 301 2.1 -9 683.50 -39.0 -38.8 -38.9 72 -99 SPO 1997 10 03 16 05 310 2.5 -9 683.50 -39.0 -38.8 -38.9 72 -99 SPO 1997 10 03 16 06 312 2.5 -9 683.40 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 16 07 314 2.1 -9 683.50 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 08 307 1.8 -9 683.50 -39.0 -38.8 -39.0 75 -99 SPO 1997 10 03 16 09 303 2.1 -9 683.50 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 10 301 2.3 -9 683.40 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 11 302 2.5 -9 683.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 10 03 16 12 306 2.4 -9 683.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 10 03 16 13 301 2.3 -9 683.50 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 14 301 2.3 -9 683.40 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 15 308 2.6 -9 683.40 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 16 310 2.7 -9 683.30 -39.0 -38.8 -39.0 75 -99 SPO 1997 10 03 16 17 307 2.7 -9 683.30 -39.0 -38.8 -38.9 76 -99 SPO 1997 10 03 16 18 306 2.9 -9 683.30 -38.9 -38.8 -38.9 74 -99 SPO 1997 10 03 16 19 305 3.0 -9 683.30 -38.9 -38.8 -38.9 74 -99 SPO 1997 10 03 16 20 306 2.7 -9 683.30 -38.9 -38.8 -38.9 75 -99 SPO 1997 10 03 16 21 307 2.6 -9 683.30 -38.9 -38.8 -38.9 74 -99 SPO 1997 10 03 16 22 308 2.7 -9 683.30 -38.9 -38.8 -38.9 74 -99 SPO 1997 10 03 16 23 308 2.4 -9 683.30 -38.7 -38.9 -38.9 72 -99 SPO 1997 10 03 16 24 309 2.4 -9 683.30 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 16 25 311 2.6 -9 683.30 -38.7 -38.9 -38.8 73 -99 SPO 1997 10 03 16 26 311 2.5 -9 683.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 10 03 16 27 306 2.3 -9 683.40 -38.9 -39.0 -38.8 75 -99 SPO 1997 10 03 16 28 303 2.4 -9 683.40 -38.9 -39.0 -38.9 75 -99 SPO 1997 10 03 16 29 301 2.5 -9 683.30 -39.0 -38.9 -39.0 76 -99 SPO 1997 10 03 16 30 299 2.8 -9 683.30 -39.0 -38.9 -39.0 75 -99 SPO 1997 10 03 16 31 298 2.6 -9 683.30 -39.0 -38.9 -39.0 74 -99 SPO 1997 10 03 16 32 299 2.5 -9 683.30 -39.0 -38.9 -39.0 72 -99 SPO 1997 10 03 16 33 301 2.2 -9 683.30 -39.0 -39.0 -39.0 72 -99 SPO 1997 10 03 16 34 300 2.2 -9 683.30 -39.0 -39.0 -39.0 72 -99 SPO 1997 10 03 16 35 300 2.5 -9 683.30 -39.0 -38.9 -39.0 74 -99 SPO 1997 10 03 16 36 299 2.5 -9 683.30 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 37 295 2.5 -9 683.30 -39.0 -38.8 -39.0 74 -99 SPO 1997 10 03 16 38 295 2.5 -9 683.30 -39.0 -38.7 -39.0 72 -99 SPO 1997 10 03 16 39 296 2.5 -9 683.30 -39.0 -38.7 -39.0 72 -99 SPO 1997 10 03 16 40 300 2.3 -9 683.30 -39.0 -38.6 -39.0 72 -99 SPO 1997 10 03 16 41 301 2.3 -9 683.30 -39.0 -38.6 -39.0 72 -99 SPO 1997 10 03 16 42 307 2.3 -9 683.20 -39.0 -38.7 -39.0 74 -99 SPO 1997 10 03 16 43 311 2.1 -9 683.30 -39.0 -38.7 -39.0 75 -99 SPO 1997 10 03 16 44 312 1.9 -9 683.30 -39.0 -38.7 -38.9 75 -99 SPO 1997 10 03 16 45 310 1.8 -9 683.30 -39.0 -38.8 -38.9 75 -99 SPO 1997 10 03 16 46 311 1.8 -9 683.30 -39.0 -38.8 -38.9 74 -99 SPO 1997 10 03 16 47 313 1.8 -9 683.30 -38.9 -38.8 -38.9 74 -99 SPO 1997 10 03 16 48 311 2.1 -9 683.30 -38.9 -38.8 -38.9 75 -99 SPO 1997 10 03 16 49 309 2.1 -9 683.30 -38.9 -38.8 -38.9 75 -99 SPO 1997 10 03 16 50 305 2.2 -9 683.30 -38.9 -38.8 -38.9 75 -99 SPO 1997 10 03 16 51 299 2.3 -9 683.30 -38.9 -38.8 -38.9 75 -99 SPO 1997 10 03 16 52 297 2.2 -9 683.40 -38.9 -38.8 -38.8 75 -99 SPO 1997 10 03 16 53 295 2.2 -9 683.40 -38.9 -38.8 -38.8 75 -99 SPO 1997 10 03 16 54 290 2.3 -9 683.40 -38.9 -38.8 -38.8 75 -99 SPO 1997 10 03 16 55 288 2.4 -9 683.30 -38.9 -38.8 -38.8 74 -99 SPO 1997 10 03 16 56 288 2.5 -9 683.30 -38.7 -38.7 -38.8 73 -99 SPO 1997 10 03 16 57 289 2.5 -9 683.30 -38.7 -38.7 -38.8 73 -99 SPO 1997 10 03 16 58 286 2.5 -9 683.30 -38.7 -38.7 -38.7 73 -99 SPO 1997 10 03 16 59 285 2.2 -9 683.30 -38.7 -38.7 -38.8 73 -99 SPO 1997 10 03 17 00 281 2.2 -9 683.40 -38.7 -38.7 -38.7 75 0 SPO 1997 10 03 17 01 281 2.0 -9 683.40 -38.7 -38.7 -38.7 75 -99 SPO 1997 10 03 17 02 289 1.9 -9 683.30 -38.7 -38.7 -38.7 74 -99 SPO 1997 10 03 17 03 292 1.8 -9 683.30 -38.7 -38.7 -38.7 74 -99 SPO 1997 10 03 17 04 296 1.5 -9 683.40 -38.7 -38.8 -38.7 74 -99 SPO 1997 10 03 17 05 296 1.4 -9 683.40 -38.7 -38.8 -38.7 73 -99 SPO 1997 10 03 17 06 293 1.6 -9 683.40 -38.7 -38.8 -38.7 74 -99 SPO 1997 10 03 17 07 289 1.8 -9 683.40 -38.7 -38.7 -38.7 74 -99 SPO 1997 10 03 17 08 279 2.1 -9 683.40 -38.7 -38.7 -38.7 74 -99 SPO 1997 10 03 17 09 269 2.3 -9 683.40 -38.7 -38.7 -38.7 74 -99 SPO 1997 10 03 17 10 259 2.4 -9 683.50 -38.7 -38.8 -38.7 74 -99 SPO 1997 10 03 17 11 255 2.5 -9 683.50 -38.9 -38.8 -38.8 75 -99 SPO 1997 10 03 17 12 256 2.7 -9 683.40 -38.9 -38.8 -38.8 74 -99 SPO 1997 10 03 17 13 259 2.6 -9 683.40 -38.9 -38.7 -38.8 73 -99 SPO 1997 10 03 17 14 259 2.4 -9 683.40 -38.7 -38.7 -38.7 72 -99 SPO 1997 10 03 17 15 257 2.4 -9 683.40 -38.7 -38.7 -38.7 72 -99 SPO 1997 10 03 17 16 253 2.8 -9 683.40 -38.7 -38.7 -38.6 72 -99 SPO 1997 10 03 17 17 251 2.9 -9 683.40 -38.7 -38.7 -38.6 72 -99 SPO 1997 10 03 17 18 248 3.1 -9 683.40 -38.7 -38.6 -38.6 72 -99 SPO 1997 10 03 17 19 251 2.9 -9 683.40 -38.7 -38.6 -38.6 73 -99 SPO 1997 10 03 17 20 254 2.8 -9 683.40 -38.7 -38.6 -38.6 73 -99 SPO 1997 10 03 17 21 261 2.6 -9 683.30 -38.7 -38.6 -38.6 73 -99 SPO 1997 10 03 17 22 265 2.4 -9 683.30 -38.7 -38.6 -38.7 73 -99 SPO 1997 10 03 17 23 265 2.5 -9 683.30 -38.7 -38.6 -38.7 73 -99 SPO 1997 10 03 17 24 266 2.4 -9 683.30 -38.7 -38.7 -38.6 72 -99 SPO 1997 10 03 17 25 271 2.1 -9 683.30 -38.7 -38.7 -38.6 72 -99 SPO 1997 10 03 17 26 278 1.9 -9 683.30 -38.7 -38.8 -38.6 73 -99 SPO 1997 10 03 17 27 280 2.0 -9 683.20 -38.7 -38.8 -38.7 73 -99 SPO 1997 10 03 17 28 276 2.1 -9 683.20 -38.7 -38.8 -38.7 73 -99 SPO 1997 10 03 17 29 273 1.9 -9 683.20 -38.7 -38.9 -38.7 73 -99 SPO 1997 10 03 17 30 269 1.7 -9 683.30 -38.7 -38.9 -38.7 73 -99 SPO 1997 10 03 17 31 268 1.7 -9 683.20 -38.7 -38.8 -38.7 72 -99 SPO 1997 10 03 17 32 267 1.8 -9 683.30 -38.7 -38.9 -38.8 72 -99 SPO 1997 10 03 17 33 275 1.6 -9 683.30 -38.9 -38.9 -38.8 72 -99 SPO 1997 10 03 17 34 279 1.2 -9 683.30 -38.7 -38.9 -38.8 70 -99 SPO 1997 10 03 17 35 285 0.9 -9 683.30 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 17 36 282 0.9 -9 683.30 -38.9 -38.9 -38.7 74 -99 SPO 1997 10 03 17 37 271 1.1 -9 683.30 -38.9 -38.9 -38.7 74 -99 SPO 1997 10 03 17 38 275 1.0 -9 683.30 -38.9 -38.9 -38.8 74 -99 SPO 1997 10 03 17 39 279 1.0 -9 683.30 -38.9 -38.9 -38.7 75 -99 SPO 1997 10 03 17 40 267 1.1 -9 683.20 -38.9 -38.9 -38.8 74 -99 SPO 1997 10 03 17 41 266 1.4 -9 683.30 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 17 42 269 1.5 -9 683.20 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 17 43 272 1.7 -9 683.20 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 17 44 269 1.9 -9 683.20 -38.9 -38.8 -38.8 73 -99 SPO 1997 10 03 17 45 268 2.2 -9 683.20 -38.9 -38.9 -38.8 73 -99 SPO 1997 10 03 17 46 269 2.3 -9 683.20 -39.0 -38.9 -38.9 74 -99 SPO 1997 10 03 17 47 279 2.2 -9 683.20 -39.0 -38.9 -38.9 72 -99 SPO 1997 10 03 17 48 284 2.0 -9 683.10 -39.0 -39.0 -38.9 72 -99 SPO 1997 10 03 17 49 285 2.0 -9 683.20 -39.4 -39.0 -39.0 75 -99 SPO 1997 10 03 17 50 284 2.1 -9 683.20 -39.5 -39.0 -39.1 74 -99 SPO 1997 10 03 17 51 283 2.0 -9 683.20 -39.7 -39.0 -39.3 74 -99 SPO 1997 10 03 17 52 290 1.8 -9 683.20 -39.7 -39.0 -39.4 72 -99 SPO 1997 10 03 17 53 283 1.8 -9 683.20 -39.5 -39.0 -39.2 71 -99 SPO 1997 10 03 17 54 282 1.9 -9 683.20 -39.5 -39.1 -39.3 72 -99 SPO 1997 10 03 17 55 292 1.8 -9 683.20 -39.7 -39.1 -39.4 74 -99 SPO 1997 10 03 17 56 290 1.7 -9 683.30 -39.7 -39.1 -39.4 74 -99 SPO 1997 10 03 17 57 279 1.8 -9 683.30 -39.7 -39.1 -39.5 74 -99 SPO 1997 10 03 17 58 277 1.8 -9 683.30 -39.9 -39.1 -39.6 75 -99 SPO 1997 10 03 17 59 273 1.6 -9 683.40 -40.0 -39.1 -39.7 74 -99 SPO 1997 10 03 18 00 276 1.4 -9 683.30 -40.0 -39.1 -39.8 73 0 SPO 1997 10 03 18 01 274 1.5 -9 683.30 -40.0 -39.1 -39.8 74 -99 SPO 1997 10 03 18 02 267 1.5 -9 683.40 -40.2 -39.1 -39.8 75 -99 SPO 1997 10 03 18 03 261 1.6 -9 683.40 -40.2 -39.1 -39.8 75 -99 SPO 1997 10 03 18 04 262 1.6 -9 683.40 -40.2 -39.1 -39.9 74 -99 SPO 1997 10 03 18 05 266 1.8 -9 683.40 -40.2 -39.1 -39.9 73 -99 SPO 1997 10 03 18 06 270 1.7 -9 683.30 -40.2 -39.1 -39.9 72 -99 SPO 1997 10 03 18 07 274 1.7 -9 683.30 -40.2 -39.1 -40.0 73 -99 SPO 1997 10 03 18 08 275 1.6 -9 683.30 -40.2 -39.1 -39.9 74 -99 SPO 1997 10 03 18 09 274 1.4 -9 683.30 -40.2 -39.1 -39.9 74 -99 SPO 1997 10 03 18 10 274 1.5 -9 683.30 -40.2 -39.2 -39.8 75 -99 SPO 1997 10 03 18 11 268 1.6 -9 683.30 -40.2 -39.2 -39.8 75 -99 SPO 1997 10 03 18 12 269 1.3 -9 683.30 -40.2 -39.2 -39.8 75 -99 SPO 1997 10 03 18 13 279 1.2 -9 683.30 -40.2 -39.3 -39.9 75 -99 SPO 1997 10 03 18 14 279 1.3 -9 683.30 -40.4 -39.3 -39.8 77 -99 SPO 1997 10 03 18 15 282 1.4 -9 683.30 -40.5 -39.2 -39.8 76 -99 SPO 1997 10 03 18 16 285 1.3 -9 683.30 -40.5 -39.2 -39.8 74 -99 SPO 1997 10 03 18 17 291 1.2 -9 683.30 -40.4 -39.3 -39.8 73 -99 SPO 1997 10 03 18 18 293 1.0 -9 683.30 -40.2 -39.2 -39.8 71 -99 SPO 1997 10 03 18 19 298 0.9 -9 683.30 -40.2 -39.2 -39.8 71 -99 SPO 1997 10 03 18 20 301 0.9 -9 683.20 -40.0 -39.2 -39.7 70 -99 SPO 1997 10 03 18 21 299 0.9 -9 683.20 -40.0 -39.2 -39.6 70 -99 SPO 1997 10 03 18 22 295 0.8 -9 683.20 -39.9 -39.3 -39.6 71 -99 SPO 1997 10 03 18 23 295 0.8 -9 683.20 -39.7 -39.2 -39.5 70 -99 SPO 1997 10 03 18 24 296 0.7 -9 683.20 -39.7 -39.3 -39.5 71 -99 SPO 1997 10 03 18 25 294 0.8 -9 683.30 -39.7 -39.3 -39.5 72 -99 SPO 1997 10 03 18 26 292 1.0 -9 683.30 -39.5 -39.3 -39.5 71 -99 SPO 1997 10 03 18 27 295 0.9 -9 683.20 -39.7 -39.2 -39.5 72 -99 SPO 1997 10 03 18 28 297 0.9 -9 683.20 -39.7 -39.2 -39.5 72 -99 SPO 1997 10 03 18 29 300 0.9 -9 683.20 -39.7 -39.2 -39.4 72 -99 SPO 1997 10 03 18 30 303 0.8 -9 683.20 -39.5 -39.2 -39.4 70 -99 SPO 1997 10 03 18 31 315 0.6 -9 683.20 -39.7 -39.2 -39.4 71 -99 SPO 1997 10 03 18 32 313 0.5 -9 683.20 -39.7 -39.3 -39.4 71 -99 SPO 1997 10 03 18 33 317 0.6 -9 683.20 -39.5 -39.4 -39.4 69 -99 SPO 1997 10 03 18 34 310 0.7 -9 683.20 -39.5 -39.4 -39.4 70 -99 SPO 1997 10 03 18 35 302 0.7 -9 683.30 -39.5 -39.4 -39.4 70 -99 SPO 1997 10 03 18 36 289 0.9 -9 683.30 -39.5 -39.4 -39.4 71 -99 SPO 1997 10 03 18 37 282 0.9 -9 683.30 -39.5 -39.4 -39.4 72 -99 SPO 1997 10 03 18 38 301 0.7 -9 683.20 -39.5 -39.4 -39.4 73 -99 SPO 1997 10 03 18 39 301 0.5 -9 683.20 -39.5 -39.4 -39.4 73 -99 SPO 1997 10 03 18 40 313 0.7 -9 683.20 -39.5 -39.4 -39.3 72 -99 SPO 1997 10 03 18 41 315 0.9 -9 683.20 -39.5 -39.4 -39.3 72 -99 SPO 1997 10 03 18 42 311 1.1 -9 683.20 -39.5 -39.4 -39.4 71 -99 SPO 1997 10 03 18 43 308 1.3 -9 683.20 -39.5 -39.4 -39.4 71 -99 SPO 1997 10 03 18 44 314 1.1 -9 683.20 -39.5 -39.5 -39.4 71 -99 SPO 1997 10 03 18 45 318 0.8 -9 683.20 -39.5 -39.5 -39.3 72 -99 SPO 1997 10 03 18 46 318 0.7 -9 683.20 -39.5 -39.5 -39.3 72 -99 SPO 1997 10 03 18 47 308 0.7 -9 683.20 -39.5 -39.5 -39.3 72 -99 SPO 1997 10 03 18 48 299 0.7 -9 683.20 -39.5 -39.5 -39.3 72 -99 SPO 1997 10 03 18 49 291 0.8 -9 683.20 -39.5 -39.5 -39.3 72 -99 SPO 1997 10 03 18 50 285 0.9 -9 683.20 -39.5 -39.5 -39.4 72 -99 SPO 1997 10 03 18 51 286 0.8 -9 683.20 -39.5 -39.5 -39.4 72 -99 SPO 1997 10 03 18 52 283 0.6 -9 683.30 -39.7 -39.5 -39.4 72 -99 SPO 1997 10 03 18 53 293 0.5 -9 683.20 -40.0 -39.6 -39.5 72 -99 SPO 1997 10 03 18 54 299 0.5 -9 683.20 -39.7 -39.6 -39.4 69 -99 SPO 1997 10 03 18 55 302 0.7 -9 683.20 -39.7 -39.7 -39.4 71 -99 SPO 1997 10 03 18 56 299 0.8 -9 683.20 -39.7 -39.7 -39.4 72 -99 SPO 1997 10 03 18 57 299 0.9 -9 683.20 -39.7 -39.7 -39.5 72 -99 SPO 1997 10 03 18 58 309 0.9 -9 683.20 -39.7 -39.7 -39.5 73 -99 SPO 1997 10 03 18 59 313 0.9 -9 683.10 -39.7 -39.7 -39.5 73 -99 SPO 1997 10 03 19 00 315 0.9 -9 683.10 -39.7 -39.7 -39.5 72 0 SPO 1997 10 03 19 01 309 0.7 -9 683.10 -40.0 -39.7 -39.6 74 -99 SPO 1997 10 03 19 02 299 1.1 -9 683.10 -40.0 -39.7 -39.7 73 -99 SPO 1997 10 03 19 03 291 1.3 -9 683.10 -40.2 -39.7 -39.8 74 -99 SPO 1997 10 03 19 04 288 1.2 -9 683.20 -40.2 -39.7 -39.8 74 -99 SPO 1997 10 03 19 05 287 1.2 -9 683.20 -40.0 -39.7 -39.8 71 -99 SPO 1997 10 03 19 06 287 1.1 -9 683.10 -40.0 -39.7 -39.8 71 -99 SPO 1997 10 03 19 07 293 1.0 -9 683.10 -40.0 -39.7 -39.8 72 -99 SPO 1997 10 03 19 08 298 0.9 -9 683.10 -40.0 -39.7 -39.9 73 -99 SPO 1997 10 03 19 09 298 0.8 -9 683.10 -40.0 -39.8 -39.9 73 -99 SPO 1997 10 03 19 10 307 0.8 -9 683.10 -40.2 -39.8 -39.9 74 -99 SPO 1997 10 03 19 11 312 0.7 -9 683.10 -40.4 -39.8 -39.9 73 -99 SPO 1997 10 03 19 12 314 0.8 -9 683.10 -41.0 -39.8 -40.0 74 -99 SPO 1997 10 03 19 13 317 0.9 -9 683.10 -41.0 -39.8 -40.1 70 -99 SPO 1997 10 03 19 14 330 1.1 -9 683.10 -40.7 -39.8 -40.1 67 -99 SPO 1997 10 03 19 15 341 1.2 -9 683.10 -40.7 -39.8 -40.2 68 -99 SPO 1997 10 03 19 16 335 1.0 -9 683.10 -40.7 -39.9 -40.3 69 -99 SPO 1997 10 03 19 17 340 1.0 -9 683.10 -41.2 -39.9 -40.7 73 -99 SPO 1997 10 03 19 18 348 1.2 -9 683.10 -41.2 -39.9 -40.8 72 -99 SPO 1997 10 03 19 19 348 1.5 -9 683.10 -41.4 -39.9 -40.9 72 -99 SPO 1997 10 03 19 20 356 1.7 -9 683.10 -41.5 -40.0 -41.0 71 -99 SPO 1997 10 03 19 21 6 2.1 -9 683.10 -42.4 -40.0 -41.3 77 -99 SPO 1997 10 03 19 22 7 1.9 -9 683.10 -43.4 -40.0 -42.4 81 -99 SPO 1997 10 03 19 23 7 1.6 -9 683.20 -43.0 -40.0 -42.4 71 -99 SPO 1997 10 03 19 24 7 1.5 -9 683.20 -42.1 -40.0 -41.8 63 -99 SPO 1997 10 03 19 25 7 1.6 -9 683.20 -41.5 -40.0 -41.4 60 -99 SPO 1997 10 03 19 26 7 1.9 -9 683.10 -42.4 -40.1 -41.2 69 -99 SPO 1997 10 03 19 27 10 2.2 -9 683.10 -42.4 -40.1 -41.1 69 -99 SPO 1997 10 03 19 28 14 2.2 -9 683.10 -42.4 -40.2 -41.6 68 -99 SPO 1997 10 03 19 29 4 2.1 -9 683.10 -42.5 -40.1 -41.8 68 -99 SPO 1997 10 03 19 30 352 1.9 -9 683.10 -42.1 -40.1 -41.5 65 -99 SPO 1997 10 03 19 31 350 1.8 -9 683.10 -42.2 -40.0 -41.5 66 -99 SPO 1997 10 03 19 32 355 2.2 -9 683.10 -43.2 -40.0 -42.4 74 -99 SPO 1997 10 03 19 33 2 2.3 -9 683.10 -44.0 -40.0 -43.2 78 -99 SPO 1997 10 03 19 34 359 2.2 -9 683.10 -44.0 -40.0 -43.2 73 -99 SPO 1997 10 03 19 35 349 1.9 -9 683.10 -43.6 -39.9 -43.0 67 -99 SPO 1997 10 03 19 36 342 1.6 -9 683.10 -43.2 -39.9 -42.4 63 -99 SPO 1997 10 03 19 37 344 1.6 -9 683.10 -43.1 -39.9 -42.2 64 -99 SPO 1997 10 03 19 38 352 1.6 -9 683.10 -43.4 -39.9 -42.6 68 -99 SPO 1997 10 03 19 39 354 1.8 -9 683.10 -43.4 -40.0 -42.8 68 -99 SPO 1997 10 03 19 40 353 1.7 -9 683.10 -43.6 -40.0 -42.9 69 -99 SPO 1997 10 03 19 41 354 1.8 -9 683.10 -43.6 -40.0 -42.9 68 -99 SPO 1997 10 03 19 42 353 1.9 -9 683.10 -43.1 -40.0 -42.5 65 -99 SPO 1997 10 03 19 43 354 2.3 -9 683.10 -42.9 -40.0 -42.4 64 -99 SPO 1997 10 03 19 44 358 2.9 -9 683.00 -43.4 -40.0 -42.5 68 -99 SPO 1997 10 03 19 45 5 3.0 -9 683.00 -44.0 -40.0 -43.1 72 -99 SPO 1997 10 03 19 46 1 2.7 -9 683.00 -44.0 -40.0 -43.1 71 -99 SPO 1997 10 03 19 47 2 3.0 -9 683.00 -43.7 -40.0 -43.2 67 -99 SPO 1997 10 03 19 48 7 3.7 -9 682.90 -44.2 -40.0 -43.6 71 -99 SPO 1997 10 03 19 49 1 3.3 -9 682.90 -44.7 -40.1 -44.0 73 -99 SPO 1997 10 03 19 50 354 2.6 -9 682.90 -44.5 -40.0 -44.0 68 -99 SPO 1997 10 03 19 51 354 2.5 -9 682.90 -44.2 -39.9 -43.8 65 -99 SPO 1997 10 03 19 52 357 2.5 -9 682.90 -44.4 -39.9 -43.8 67 -99 SPO 1997 10 03 19 53 357 2.5 -9 682.90 -44.4 -39.9 -43.8 68 -99 SPO 1997 10 03 19 54 358 2.7 -9 682.90 -44.2 -39.9 -43.7 67 -99 SPO 1997 10 03 19 55 3 3.1 -9 682.90 -44.4 -40.0 -43.8 70 -99 SPO 1997 10 03 19 56 10 3.9 -9 682.80 -44.7 -40.1 -44.2 70 -99 SPO 1997 10 03 19 57 9 3.9 -9 682.80 -45.0 -40.2 -44.4 71 -99 SPO 1997 10 03 19 58 4 3.3 -9 682.80 -44.7 -40.2 -44.3 67 -99 SPO 1997 10 03 19 59 359 2.9 -9 682.80 -44.5 -40.0 -44.0 65 -99 SPO 1997 10 03 20 00 0 3.1 -9 682.80 -44.4 -40.0 -43.9 65 0 SPO 1997 10 03 20 01 2 3.5 -9 682.80 -44.7 -40.1 -44.2 68 -99 SPO 1997 10 03 20 02 5 3.6 -9 682.70 -44.9 -40.0 -44.4 69 -99 SPO 1997 10 03 20 03 10 3.6 -9 682.70 -45.0 -40.2 -44.6 70 -99 SPO 1997 10 03 20 04 7 3.5 -9 682.70 -45.2 -40.2 -44.8 70 -99 SPO 1997 10 03 20 05 3 3.4 -9 682.70 -45.2 -40.0 -44.7 69 -99 SPO 1997 10 03 20 06 4 3.6 -9 682.70 -45.0 -40.0 -44.6 67 -99 SPO 1997 10 03 20 07 5 4.0 -9 682.70 -45.0 -40.2 -44.7 68 -99 SPO 1997 10 03 20 08 3 4.0 -9 682.70 -45.0 -40.4 -44.7 68 -99 SPO 1997 10 03 20 09 359 3.6 -9 682.70 -45.0 -40.2 -44.7 68 -99 SPO 1997 10 03 20 10 357 3.4 -9 682.70 -45.0 -40.0 -44.7 67 -99 SPO 1997 10 03 20 11 358 3.6 -9 682.70 -45.0 -40.0 -44.7 67 -99 SPO 1997 10 03 20 12 360 3.8 -9 682.60 -45.2 -40.0 -44.8 68 -99 SPO 1997 10 03 20 13 358 3.6 -9 682.60 -45.2 -40.0 -44.9 66 -99 SPO 1997 10 03 20 14 356 3.5 -9 682.60 -45.2 -39.9 -44.9 66 -99 SPO 1997 10 03 20 15 359 3.7 -9 682.60 -45.0 -40.0 -44.8 65 -99 SPO 1997 10 03 20 16 6 4.3 -9 682.60 -45.4 -40.4 -44.9 69 -99 SPO 1997 10 03 20 17 5 4.1 -9 682.60 -45.7 -40.8 -45.2 72 -99 SPO 1997 10 03 20 18 3 3.9 -9 682.60 -45.7 -40.6 -45.3 70 -99 SPO 1997 10 03 20 19 6 4.4 -9 682.60 -45.7 -40.8 -45.3 69 -99 SPO 1997 10 03 20 20 8 4.6 -9 682.60 -45.9 -41.0 -45.4 70 -99 SPO 1997 10 03 20 21 4 4.2 -9 682.60 -45.9 -41.0 -45.5 69 -99 SPO 1997 10 03 20 22 360 4.1 -9 682.60 -45.7 -40.8 -45.4 67 -99 SPO 1997 10 03 20 23 358 4.3 -9 682.50 -45.7 -40.8 -45.3 67 -99 SPO 1997 10 03 20 24 357 4.4 -9 682.50 -45.7 -40.9 -45.4 67 -99 SPO 1997 10 03 20 25 355 4.3 -9 682.50 -45.7 -41.0 -45.4 67 -99 SPO 1997 10 03 20 26 351 4.3 -9 682.60 -45.9 -41.0 -45.5 68 -99 SPO 1997 10 03 20 27 351 4.4 -9 682.50 -45.9 -41.0 -45.6 68 -99 SPO 1997 10 03 20 28 351 4.6 -9 682.50 -46.0 -41.2 -45.6 68 -99 SPO 1997 10 03 20 29 349 4.5 -9 682.50 -46.0 -41.2 -45.7 69 -99 SPO 1997 10 03 20 30 348 4.4 -9 682.60 -46.2 -41.2 -45.8 69 -99 SPO 1997 10 03 20 31 346 4.4 -9 682.60 -46.2 -41.2 -45.8 68 -99 SPO 1997 10 03 20 32 342 4.3 -9 682.60 -46.0 -41.4 -45.7 67 -99 SPO 1997 10 03 20 33 339 4.3 -9 682.60 -46.0 -41.4 -45.7 67 -99 SPO 1997 10 03 20 34 338 4.1 -9 682.60 -46.2 -41.4 -45.8 69 -99 SPO 1997 10 03 20 35 338 4.2 -9 682.60 -46.2 -41.5 -45.8 69 -99 SPO 1997 10 03 20 36 336 4.1 -9 682.60 -46.4 -41.7 -45.9 71 -99 SPO 1997 10 03 20 37 334 4.0 -9 682.70 -46.4 -41.8 -45.9 70 -99 SPO 1997 10 03 20 38 332 4.0 -9 682.60 -46.4 -41.8 -46.0 69 -99 SPO 1997 10 03 20 39 334 4.0 -9 682.60 -46.5 -41.7 -46.0 69 -99 SPO 1997 10 03 20 40 335 4.1 -9 682.60 -46.2 -41.6 -45.8 67 -99 SPO 1997 10 03 20 41 336 4.2 -9 682.60 -46.0 -41.6 -45.7 66 -99 SPO 1997 10 03 20 42 340 4.3 -9 682.60 -46.0 -41.7 -45.6 66 -99 SPO 1997 10 03 20 43 344 4.4 -9 682.50 -46.0 -41.7 -45.8 68 -99 SPO 1997 10 03 20 44 345 4.4 -9 682.50 -46.0 -41.8 -45.7 68 -99 SPO 1997 10 03 20 45 344 4.1 -9 682.50 -45.9 -41.6 -45.6 67 -99 SPO 1997 10 03 20 46 342 4.2 -9 682.50 -45.5 -41.6 -45.4 65 -99 SPO 1997 10 03 20 47 341 4.2 -9 682.50 -45.6 -41.4 -45.5 66 -99 SPO 1997 10 03 20 48 342 4.3 -9 682.50 -45.9 -41.6 -45.6 69 -99 SPO 1997 10 03 20 49 342 4.4 -9 682.50 -46.2 -41.4 -45.9 71 -99 SPO 1997 10 03 20 50 344 4.5 -9 682.50 -46.0 -41.4 -45.7 68 -99 SPO 1997 10 03 20 51 346 4.3 -9 682.40 -46.0 -41.5 -45.7 67 -99 SPO 1997 10 03 20 52 343 4.3 -9 682.50 -46.4 -41.5 -46.0 70 -99 SPO 1997 10 03 20 53 340 4.2 -9 682.40 -46.5 -41.3 -46.1 70 -99 SPO 1997 10 03 20 54 340 4.2 -9 682.40 -46.4 -41.2 -46.0 68 -99 SPO 1997 10 03 20 55 342 4.4 -9 682.40 -46.4 -41.3 -46.0 68 -99 SPO 1997 10 03 20 56 344 4.5 -9 682.40 -46.5 -41.4 -46.1 69 -99 SPO 1997 10 03 20 57 344 4.4 -9 682.40 -46.7 -41.5 -46.2 70 -99 SPO 1997 10 03 20 58 343 4.4 -9 682.40 -46.7 -41.5 -46.3 68 -99 SPO 1997 10 03 20 59 344 4.4 -9 682.40 -46.7 -41.6 -46.3 68 -99 SPO 1997 10 03 21 00 346 4.3 -9 682.40 -47.0 -41.6 -46.5 70 0 SPO 1997 10 03 21 01 346 4.3 -9 682.40 -47.0 -41.6 -46.5 69 -99 SPO 1997 10 03 21 02 344 4.3 -9 682.30 -47.0 -41.6 -46.6 68 -99 SPO 1997 10 03 21 03 343 4.2 -9 682.30 -46.7 -41.5 -46.4 66 -99 SPO 1997 10 03 21 04 344 4.2 -9 682.30 -47.2 -41.5 -46.6 70 -99 SPO 1997 10 03 21 05 342 4.3 -9 682.30 -47.2 -41.5 -46.7 69 -99 SPO 1997 10 03 21 06 337 4.2 -9 682.30 -47.2 -41.4 -46.6 68 -99 SPO 1997 10 03 21 07 332 4.1 -9 682.30 -47.0 -41.4 -46.5 65 -99 SPO 1997 10 03 21 08 332 4.2 -9 682.30 -47.0 -41.3 -46.4 65 -99 SPO 1997 10 03 21 09 340 4.3 -9 682.30 -47.0 -41.4 -46.6 65 -99 SPO 1997 10 03 21 10 343 4.4 -9 682.30 -47.2 -41.5 -46.8 68 -99 SPO 1997 10 03 21 11 336 4.2 -9 682.20 -47.2 -41.5 -46.8 68 -99 SPO 1997 10 03 21 12 331 4.0 -9 682.20 -47.2 -41.4 -46.6 68 -99 SPO 1997 10 03 21 13 332 4.1 -9 682.20 -47.2 -41.2 -46.6 68 -99 SPO 1997 10 03 21 14 339 4.3 -9 682.20 -47.2 -41.4 -46.7 67 -99 SPO 1997 10 03 21 15 341 4.4 -9 682.20 -47.5 -41.6 -46.9 70 -99 SPO 1997 10 03 21 16 338 4.0 -9 682.20 -47.5 -41.6 -47.0 69 -99 SPO 1997 10 03 21 17 334 4.0 -9 682.20 -47.7 -41.6 -47.1 69 -99 SPO 1997 10 03 21 18 334 4.1 -9 682.20 -47.7 -41.5 -47.0 68 -99 SPO 1997 10 03 21 19 336 4.2 -9 682.20 -47.0 -41.5 -46.7 63 -99 SPO 1997 10 03 21 20 336 4.3 -9 682.20 -47.2 -41.4 -46.8 65 -99 SPO 1997 10 03 21 21 334 4.4 -9 682.10 -47.5 -41.4 -46.8 67 -99 SPO 1997 10 03 21 22 333 4.4 -9 682.20 -47.4 -41.4 -46.7 67 -99 SPO 1997 10 03 21 23 333 4.5 -9 682.20 -47.4 -41.3 -46.7 67 -99 SPO 1997 10 03 21 24 334 4.5 -9 682.20 -47.5 -41.4 -46.9 67 -99 SPO 1997 10 03 21 25 334 4.5 -9 682.20 -47.4 -41.5 -46.9 67 -99 SPO 1997 10 03 21 26 329 4.4 -9 682.20 -47.4 -41.5 -46.8 -99 -99 SPO 1997 10 03 21 27 326 4.5 -9 682.20 -47.7 -41.3 -47.1 -99 -99 SPO 1997 10 03 21 28 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 03 21 29 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 03 21 30 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 03 21 31 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 03 21 32 320 4.5 -9 682.30 -47.7 -41.7 -47.2 -99 -99 SPO 1997 10 03 21 33 319 4.4 -9 682.30 -47.5 -41.6 -47.1 -99 -99 SPO 1997 10 03 21 34 318 4.5 -9 682.20 -47.7 -41.8 -47.2 -99 -99 SPO 1997 10 03 21 35 317 4.4 -9 682.30 -48.0 -41.8 -47.4 70 -99 SPO 1997 10 03 21 36 316 4.4 -9 682.30 -48.0 -41.8 -47.4 70 -99 SPO 1997 10 03 21 37 317 4.3 -9 682.20 -48.0 -41.8 -47.4 70 -99 SPO 1997 10 03 21 38 316 4.2 -9 682.20 -47.7 -41.8 -47.2 67 -99 SPO 1997 10 03 21 39 315 4.1 -9 682.20 -47.5 -41.6 -47.0 67 -99 SPO 1997 10 03 21 40 313 4.0 -9 682.20 -47.4 -41.4 -46.9 67 -99 SPO 1997 10 03 21 41 312 4.0 -9 682.10 -47.2 -41.4 -46.8 67 -99 SPO 1997 10 03 21 42 312 4.1 -9 682.10 -47.2 -41.3 -46.6 68 -99 SPO 1997 10 03 21 43 311 4.2 -9 682.10 -47.0 -41.2 -46.4 68 -99 SPO 1997 10 03 21 44 309 4.3 -9 682.10 -47.0 -41.1 -46.4 68 -99 SPO 1997 10 03 21 45 308 4.3 -9 682.10 -47.0 -41.1 -46.4 69 -99 SPO 1997 10 03 21 46 308 4.2 -9 682.10 -47.2 -41.2 -46.6 71 -99 SPO 1997 10 03 21 47 308 4.2 -9 682.10 -47.2 -41.3 -46.7 71 -99 SPO 1997 10 03 21 48 307 4.2 -9 682.10 -47.0 -41.2 -46.6 68 -99 SPO 1997 10 03 21 49 306 4.1 -9 682.10 -46.9 -41.0 -46.4 68 -99 SPO 1997 10 03 21 50 306 4.1 -9 682.10 -47.0 -41.0 -46.5 68 -99 SPO 1997 10 03 21 51 306 4.0 -9 682.10 -47.0 -41.0 -46.5 70 -99 SPO 1997 10 03 21 52 306 3.9 -9 682.10 -47.0 -41.0 -46.6 71 -99 SPO 1997 10 03 21 53 306 3.8 -9 682.10 -47.2 -41.0 -46.6 72 -99 SPO 1997 10 03 21 54 304 3.6 -9 682.10 -47.0 -40.8 -46.6 71 -99 SPO 1997 10 03 21 55 302 3.6 -9 682.10 -46.9 -40.8 -46.4 70 -99 SPO 1997 10 03 21 56 301 3.6 -9 682.10 -46.7 -41.0 -46.2 70 -99 SPO 1997 10 03 21 57 299 3.6 -9 682.10 -47.0 -41.2 -46.4 72 -99 SPO 1997 10 03 21 58 298 3.5 -9 682.10 -47.0 -41.1 -46.3 72 -99 SPO 1997 10 03 21 59 297 3.5 -9 682.10 -46.7 -41.0 -46.2 71 -99 SPO 1997 10 03 22 00 296 3.5 -9 682.10 -46.7 -40.9 -46.2 71 0 SPO 1997 10 03 22 01 299 3.5 -9 682.10 -46.7 -40.8 -46.2 70 -99 SPO 1997 10 03 22 02 300 3.6 -9 682.10 -47.0 -41.0 -46.4 71 -99 SPO 1997 10 03 22 03 298 3.7 -9 682.10 -47.0 -40.9 -46.2 70 -99 SPO 1997 10 03 22 04 301 3.7 -9 682.10 -47.0 -41.0 -46.2 71 -99 SPO 1997 10 03 22 05 300 3.8 -9 682.10 -46.9 -40.9 -46.2 72 -99 SPO 1997 10 03 22 06 303 3.7 -9 682.10 -47.0 -40.8 -46.2 72 -99 SPO 1997 10 03 22 07 305 3.7 -9 682.10 -47.2 -40.6 -46.4 74 -99 SPO 1997 10 03 22 08 302 3.4 -9 682.10 -47.0 -40.5 -46.2 71 -99 SPO 1997 10 03 22 09 303 3.4 -9 682.10 -46.7 -40.5 -46.0 68 -99 SPO 1997 10 03 22 10 305 3.5 -9 682.10 -47.0 -40.6 -46.1 72 -99 SPO 1997 10 03 22 11 305 3.2 -9 682.10 -47.0 -40.5 -46.2 71 -99 SPO 1997 10 03 22 12 304 3.0 -9 682.10 -47.2 -40.6 -46.2 72 -99 SPO 1997 10 03 22 13 306 3.0 -9 682.10 -47.5 -40.8 -46.6 74 -99 SPO 1997 10 03 22 14 305 2.9 -9 682.10 -48.0 -40.9 -46.9 75 -99 SPO 1997 10 03 22 15 299 2.7 -9 682.10 -47.7 -40.8 -46.8 71 -99 SPO 1997 10 03 22 16 299 2.8 -9 682.20 -47.5 -40.8 -46.5 69 -99 SPO 1997 10 03 22 17 302 2.9 -9 682.20 -47.5 -40.9 -46.5 69 -99 SPO 1997 10 03 22 18 301 2.9 -9 682.20 -47.7 -40.9 -46.7 71 -99 SPO 1997 10 03 22 19 299 2.9 -9 682.20 -47.9 -41.0 -46.8 71 -99 SPO 1997 10 03 22 20 299 2.8 -9 682.20 -47.5 -41.0 -46.6 68 -99 SPO 1997 10 03 22 21 301 2.7 -9 682.20 -47.7 -41.1 -46.8 70 -99 SPO 1997 10 03 22 22 302 2.7 -9 682.10 -47.7 -41.1 -46.9 71 -99 SPO 1997 10 03 22 23 297 2.5 -9 682.10 -47.4 -41.1 -46.6 68 -99 SPO 1997 10 03 22 24 296 2.5 -9 682.10 -47.0 -41.1 -46.2 67 -99 SPO 1997 10 03 22 25 299 2.8 -9 682.10 -47.2 -41.1 -46.2 70 -99 SPO 1997 10 03 22 26 304 2.7 -9 682.20 -47.7 -41.2 -46.5 74 -99 SPO 1997 10 03 22 27 307 2.6 -9 682.20 -48.2 -41.2 -46.9 76 -99 SPO 1997 10 03 22 28 306 2.7 -9 682.10 -48.7 -41.3 -47.3 77 -99 SPO 1997 10 03 22 29 303 2.8 -9 682.20 -48.5 -41.3 -47.4 73 -99 SPO 1997 10 03 22 30 301 2.9 -9 682.20 -48.4 -41.3 -47.2 70 -99 SPO 1997 10 03 22 31 303 2.8 -9 682.20 -48.2 -41.3 -47.1 68 -99 SPO 1997 10 03 22 32 307 2.7 -9 682.20 -48.2 -41.3 -47.1 69 -99 SPO 1997 10 03 22 33 307 2.5 -9 682.20 -48.2 -41.3 -47.1 70 -99 SPO 1997 10 03 22 34 301 2.2 -9 682.20 -47.5 -41.2 -46.4 66 -99 SPO 1997 10 03 22 35 301 2.2 -9 682.20 -47.7 -41.2 -46.4 69 -99 SPO 1997 10 03 22 36 300 2.0 -9 682.20 -48.5 -41.1 -47.2 74 -99 SPO 1997 10 03 22 37 294 2.1 -9 682.10 -48.0 -41.1 -46.8 68 -99 SPO 1997 10 03 22 38 293 2.1 -9 682.10 -46.2 -41.1 -45.8 57 -99 SPO 1997 10 03 22 39 296 2.2 -9 682.10 -45.7 -41.2 -45.3 59 -99 SPO 1997 10 03 22 40 298 2.3 -9 682.10 -46.2 -41.2 -45.2 66 -99 SPO 1997 10 03 22 41 297 2.5 -9 682.20 -46.5 -41.1 -45.2 70 -99 SPO 1997 10 03 22 42 292 2.6 -9 682.10 -45.8 -41.0 -45.1 66 -99 SPO 1997 10 03 22 43 290 2.5 -9 682.20 -45.7 -40.9 -45.0 67 -99 SPO 1997 10 03 22 44 291 2.3 -9 682.20 -45.8 -40.9 -45.0 69 -99 SPO 1997 10 03 22 45 293 2.1 -9 682.20 -46.5 -40.9 -45.1 74 -99 SPO 1997 10 03 22 46 292 2.2 -9 682.20 -47.0 -41.2 -45.4 77 -99 SPO 1997 10 03 22 47 287 2.3 -9 682.20 -47.0 -41.1 -45.5 76 -99 SPO 1997 10 03 22 48 281 2.2 -9 682.20 -46.9 -40.8 -45.6 75 -99 SPO 1997 10 03 22 49 281 2.1 -9 682.10 -46.5 -40.8 -45.4 73 -99 SPO 1997 10 03 22 50 287 2.0 -9 682.20 -46.9 -40.8 -45.6 78 -99 SPO 1997 10 03 22 51 286 2.0 -9 682.20 -47.4 -40.9 -45.8 82 -99 SPO 1997 10 03 22 52 283 2.1 -9 682.10 -47.5 -40.9 -46.0 81 -99 SPO 1997 10 03 22 53 288 2.1 -9 682.10 -47.2 -40.9 -46.0 76 -99 SPO 1997 10 03 22 54 290 2.2 -9 682.10 -47.4 -41.0 -46.0 76 -99 SPO 1997 10 03 22 55 283 2.1 -9 682.10 -47.4 -41.0 -45.9 76 -99 SPO 1997 10 03 22 56 282 1.9 -9 682.10 -47.2 -41.0 -45.8 74 -99 SPO 1997 10 03 22 57 291 1.8 -9 682.10 -47.2 -41.1 -45.8 75 -99 SPO 1997 10 03 22 58 295 1.8 -9 682.10 -46.9 -41.2 -45.6 72 -99 SPO 1997 10 03 22 59 299 1.8 -9 682.10 -47.0 -41.2 -45.6 72 -99 SPO 1997 10 03 23 00 303 2.0 -9 682.10 -47.7 -41.3 -46.2 76 0 SPO 1997 10 03 23 01 294 1.9 -9 682.10 -47.2 -41.3 -46.0 70 -99 SPO 1997 10 03 23 02 292 1.8 -9 682.10 -47.0 -41.3 -45.8 68 -99 SPO 1997 10 03 23 03 299 1.8 -9 682.10 -47.4 -41.4 -46.1 71 -99 SPO 1997 10 03 23 04 301 1.7 -9 682.10 -47.5 -41.4 -46.3 72 -99 SPO 1997 10 03 23 05 300 1.6 -9 682.10 -47.0 -41.4 -45.9 68 -99 SPO 1997 10 03 23 06 322 1.9 -9 682.00 -47.2 -41.4 -46.0 70 -99 SPO 1997 10 03 23 07 328 2.0 -9 682.00 -47.9 -41.4 -46.8 75 -99 SPO 1997 10 03 23 08 314 1.4 -9 682.00 -47.0 -41.4 -46.2 68 -99 SPO 1997 10 03 23 09 322 1.4 -9 682.00 -46.5 -41.4 -45.6 65 -99 SPO 1997 10 03 23 10 341 1.7 -9 682.00 -46.9 -41.4 -46.0 69 -99 SPO 1997 10 03 23 11 345 1.5 -9 682.00 -47.2 -41.5 -46.3 72 -99 SPO 1997 10 03 23 12 339 1.5 -9 682.00 -47.0 -41.4 -45.9 71 -99 SPO 1997 10 03 23 13 326 1.4 -9 682.00 -46.4 -41.4 -45.4 68 -99 SPO 1997 10 03 23 14 330 1.6 -9 682.00 -46.5 -41.4 -45.6 69 -99 SPO 1997 10 03 23 15 334 1.7 -9 682.00 -46.7 -41.5 -45.9 72 -99 SPO 1997 10 03 23 16 339 1.6 -9 682.00 -47.0 -41.6 -46.0 74 -99 SPO 1997 10 03 23 17 344 1.5 -9 682.00 -46.7 -41.8 -45.8 71 -99 SPO 1997 10 03 23 18 349 1.7 -9 682.00 -46.7 -42.1 -45.6 71 -99 SPO 1997 10 03 23 19 351 1.7 -9 682.00 -47.0 -42.2 -45.8 72 -99 SPO 1997 10 03 23 20 355 1.7 -9 681.90 -46.7 -42.2 -45.6 68 -99 SPO 1997 10 03 23 21 355 1.6 -9 681.90 -46.4 -42.2 -45.2 66 -99 SPO 1997 10 03 23 22 353 1.5 -9 681.90 -47.0 -42.1 -45.1 71 -99 SPO 1997 10 03 23 23 353 1.7 -9 681.90 -48.0 -42.1 -45.9 76 -99 SPO 1997 10 03 23 24 355 1.7 -9 681.90 -47.0 -42.3 -45.6 66 -99 SPO 1997 10 03 23 25 357 1.7 -9 681.90 -46.5 -42.2 -45.3 64 -99 SPO 1997 10 03 23 26 2 1.7 -9 681.90 -47.7 -42.2 -46.2 74 -99 SPO 1997 10 03 23 27 12 1.9 -9 681.90 -47.2 -42.4 -46.0 69 -99 SPO 1997 10 03 23 28 19 1.7 -9 681.90 -47.2 -42.5 -46.2 70 -99 SPO 1997 10 03 23 29 23 1.6 -9 681.80 -45.5 -42.6 -45.2 59 -99 SPO 1997 10 03 23 30 21 1.3 -9 681.80 -47.7 -42.7 -46.1 79 -99 SPO 1997 10 03 23 31 18 1.2 -9 681.80 -47.2 -42.6 -45.9 72 -99 SPO 1997 10 03 23 32 14 1.0 -9 681.80 -47.5 -42.4 -46.1 72 -99 SPO 1997 10 03 23 33 11 1.1 -9 681.80 -47.7 -42.4 -46.0 72 -99 SPO 1997 10 03 23 34 12 1.0 -9 681.80 -47.7 -42.4 -46.0 71 -99 SPO 1997 10 03 23 35 10 1.3 -9 681.80 -48.2 -42.6 -46.3 73 -99 SPO 1997 10 03 23 36 14 1.7 -9 681.80 -49.7 -42.6 -47.5 83 -99 SPO 1997 10 03 23 37 17 1.8 -9 681.80 -50.0 -42.6 -48.1 80 -99 SPO 1997 10 03 23 38 24 2.3 -9 681.80 -50.4 -42.6 -48.6 79 -99 SPO 1997 10 03 23 39 31 2.6 -9 681.80 -50.5 -42.6 -48.9 74 -99 SPO 1997 10 03 23 40 31 2.9 -9 681.80 -50.5 -42.7 -49.0 72 -99 SPO 1997 10 03 23 41 29 3.0 -9 681.80 -50.0 -42.7 -48.8 66 -99 SPO 1997 10 03 23 42 28 3.2 -9 681.80 -49.7 -42.8 -48.7 65 -99 SPO 1997 10 03 23 43 27 3.1 -9 681.80 -49.9 -42.8 -48.7 66 -99 SPO 1997 10 03 23 44 26 3.0 -9 681.80 -50.0 -42.6 -48.8 67 -99 SPO 1997 10 03 23 45 28 2.9 -9 681.80 -50.5 -42.5 -49.3 70 -99 SPO 1997 10 03 23 46 29 3.3 -9 681.80 -50.5 -42.4 -49.4 69 -99 SPO 1997 10 03 23 47 28 3.7 -9 681.80 -50.7 -42.4 -49.6 70 -99 SPO 1997 10 03 23 48 27 3.5 -9 681.80 -50.7 -42.4 -49.6 69 -99 SPO 1997 10 03 23 49 23 3.3 -9 681.80 -50.4 -42.3 -49.2 67 -99 SPO 1997 10 03 23 50 20 3.3 -9 681.80 -50.2 -42.3 -49.1 65 -99 SPO 1997 10 03 23 51 17 3.1 -9 681.80 -49.7 -42.4 -48.8 63 -99 SPO 1997 10 03 23 52 14 2.9 -9 681.80 -49.4 -42.4 -48.4 62 -99 SPO 1997 10 03 23 53 12 2.9 -9 681.80 -48.9 -42.4 -48.0 61 -99 SPO 1997 10 03 23 54 12 3.0 -9 681.80 -48.2 -42.3 -47.5 59 -99 SPO 1997 10 03 23 55 14 3.1 -9 681.80 -48.7 -42.3 -47.9 66 -99 SPO 1997 10 03 23 56 16 3.0 -9 681.80 -48.9 -42.2 -47.9 69 -99 SPO 1997 10 03 23 57 17 2.8 -9 681.80 -48.2 -42.2 -47.6 65 -99 SPO 1997 10 03 23 58 10 2.8 -9 681.80 -48.7 -42.1 -47.7 -99 -99 SPO 1997 10 03 23 59 7 3.0 -9 681.80 -50.5 -42.1 -48.6 -99 -99 SPO 1997 10 04 00 00 19 2.9 -9 681.80 -49.0 -42.0 -48.2 -99 0 SPO 1997 10 04 00 01 17 2.6 -9 681.80 -49.0 -42.0 -48.0 -99 -99 SPO 1997 10 04 00 02 14 2.5 -9 681.80 -49.4 -42.0 -48.2 -99 -99 SPO 1997 10 04 00 03 14 2.2 -9 681.70 -48.7 -42.0 -47.8 67 -99 SPO 1997 10 04 00 04 9 2.0 -9 681.70 -49.2 -42.0 -47.9 72 -99 SPO 1997 10 04 00 05 18 2.3 -9 681.70 -49.2 -41.9 -47.9 73 -99 SPO 1997 10 04 00 06 27 2.6 -9 681.70 -50.0 -41.9 -48.4 78 -99 SPO 1997 10 04 00 07 27 2.6 -9 681.70 -50.5 -41.9 -49.2 78 -99 SPO 1997 10 04 00 08 22 2.8 -9 681.70 -51.2 -41.9 -49.6 80 -99 SPO 1997 10 04 00 09 14 2.5 -9 681.70 -50.9 -41.9 -49.4 72 -99 SPO 1997 10 04 00 10 11 2.5 -9 681.70 -50.4 -41.7 -48.8 67 -99 SPO 1997 10 04 00 11 14 2.6 -9 681.70 -50.2 -41.7 -48.4 64 -99 SPO 1997 10 04 00 12 18 2.9 -9 681.70 -50.5 -41.9 -48.8 66 -99 SPO 1997 10 04 00 13 19 2.9 -9 681.70 -50.0 -41.9 -48.8 62 -99 SPO 1997 10 04 00 14 21 3.1 -9 681.70 -50.7 -41.9 -49.4 67 -99 SPO 1997 10 04 00 15 21 3.4 -9 681.70 -50.9 -42.0 -49.6 67 -99 SPO 1997 10 04 00 16 3 2.9 -9 681.70 -50.9 -42.0 -49.5 67 -99 SPO 1997 10 04 00 17 355 2.8 -9 681.70 -51.0 -41.7 -49.5 68 -99 SPO 1997 10 04 00 18 358 3.0 -9 681.70 -50.7 -41.7 -49.5 67 -99 SPO 1997 10 04 00 19 0 3.1 -9 681.70 -50.9 -41.9 -49.6 69 -99 SPO 1997 10 04 00 20 2 3.2 -9 681.70 -51.2 -42.0 -49.8 71 -99 SPO 1997 10 04 00 21 1 3.3 -9 681.70 -51.2 -42.2 -49.8 71 -99 SPO 1997 10 04 00 22 355 3.0 -9 681.70 -50.5 -42.0 -49.4 66 -99 SPO 1997 10 04 00 23 3 3.2 -9 681.70 -51.0 -42.2 -49.5 71 -99 SPO 1997 10 04 00 24 355 3.2 -9 681.70 -51.0 -42.5 -49.7 71 -99 SPO 1997 10 04 00 25 342 3.0 -9 681.70 -50.4 -42.0 -49.3 66 -99 SPO 1997 10 04 00 26 343 3.2 -9 681.70 -50.2 -42.2 -49.0 65 -99 SPO 1997 10 04 00 27 347 3.5 -9 681.70 -50.5 -42.5 -49.1 68 -99 SPO 1997 10 04 00 28 346 3.7 -9 681.70 -50.7 -42.5 -49.4 70 -99 SPO 1997 10 04 00 29 343 3.8 -9 681.70 -50.5 -42.5 -49.3 68 -99 SPO 1997 10 04 00 30 341 3.9 -9 681.70 -50.0 -42.7 -49.0 66 -99 SPO 1997 10 04 00 31 339 3.9 -9 681.70 -50.0 -42.7 -48.9 68 -99 SPO 1997 10 04 00 32 336 4.1 -9 681.80 -50.0 -43.0 -48.8 69 -99 SPO 1997 10 04 00 33 334 4.1 -9 681.70 -50.0 -43.2 -48.8 70 -99 SPO 1997 10 04 00 34 336 4.3 -9 681.70 -50.0 -43.4 -48.8 72 -99 SPO 1997 10 04 00 35 343 4.3 -9 681.70 -50.0 -43.7 -48.8 72 -99 SPO 1997 10 04 00 36 350 4.5 -9 681.70 -49.9 -44.0 -48.8 71 -99 SPO 1997 10 04 00 37 343 4.4 -9 681.70 -49.7 -44.0 -48.7 70 -99 SPO 1997 10 04 00 38 339 4.3 -9 681.80 -49.7 -44.0 -48.6 71 -99 SPO 1997 10 04 00 39 341 4.2 -9 681.80 -49.7 -44.0 -48.7 71 -99 SPO 1997 10 04 00 40 345 4.2 -9 681.80 -49.9 -44.2 -48.8 72 -99 SPO 1997 10 04 00 41 346 4.1 -9 681.70 -50.0 -44.0 -49.1 72 -99 SPO 1997 10 04 00 42 349 4.2 -9 681.70 -50.0 -44.0 -49.3 71 -99 SPO 1997 10 04 00 43 355 4.2 -9 681.70 -50.4 -44.2 -49.6 73 -99 SPO 1997 10 04 00 44 356 4.2 -9 681.70 -50.2 -44.5 -49.6 71 -99 SPO 1997 10 04 00 45 358 4.2 -9 681.60 -50.2 -44.7 -49.6 70 -99 SPO 1997 10 04 00 46 353 4.3 -9 681.60 -50.2 -44.5 -49.6 70 -99 SPO 1997 10 04 00 47 348 4.1 -9 681.60 -50.2 -44.2 -49.5 70 -99 SPO 1997 10 04 00 48 354 4.2 -9 681.60 -50.4 -43.9 -49.6 72 -99 SPO 1997 10 04 00 49 1 4.5 -9 681.60 -50.7 -43.7 -49.8 73 -99 SPO 1997 10 04 00 50 1 4.5 -9 681.60 -50.5 -43.7 -49.5 71 -99 SPO 1997 10 04 00 51 2 4.5 -9 681.60 -50.5 -43.7 -49.4 71 -99 SPO 1997 10 04 00 52 357 4.5 -9 681.60 -50.4 -43.5 -49.3 69 -99 SPO 1997 10 04 00 53 357 4.6 -9 681.60 -50.2 -43.5 -49.2 68 -99 SPO 1997 10 04 00 54 358 4.5 -9 681.60 -50.4 -43.5 -49.4 69 -99 SPO 1997 10 04 00 55 356 4.3 -9 681.60 -50.4 -43.5 -49.4 69 -99 SPO 1997 10 04 00 56 355 4.3 -9 681.60 -50.2 -43.5 -49.4 68 -99 SPO 1997 10 04 00 57 354 4.3 -9 681.60 -50.4 -43.4 -49.4 69 -99 SPO 1997 10 04 00 58 351 4.5 -9 681.60 -50.5 -43.4 -49.6 71 -99 SPO 1997 10 04 00 59 347 4.5 -9 681.60 -50.5 -43.4 -49.6 70 -99 SPO 1997 10 04 01 00 345 4.2 -9 681.70 -50.5 -43.4 -49.6 71 0 SPO 1997 10 04 01 01 348 4.2 -9 681.70 -50.5 -43.4 -49.6 71 -99 SPO 1997 10 04 01 02 353 4.3 -9 681.80 -50.7 -43.5 -49.8 71 -99 SPO 1997 10 04 01 03 359 4.2 -9 681.80 -51.2 -43.5 -49.9 75 -99 SPO 1997 10 04 01 04 5 3.8 -9 681.70 -51.7 -43.5 -50.0 77 -99 SPO 1997 10 04 01 05 8 3.6 -9 681.70 -51.7 -43.7 -49.9 75 -99 SPO 1997 10 04 01 06 2 4.1 -9 681.70 -51.5 -43.7 -50.0 71 -99 SPO 1997 10 04 01 07 356 4.1 -9 681.60 -51.2 -43.5 -50.0 68 -99 SPO 1997 10 04 01 08 357 4.1 -9 681.60 -51.2 -43.5 -50.0 68 -99 SPO 1997 10 04 01 09 359 4.2 -9 681.60 -51.2 -43.5 -50.0 68 -99 SPO 1997 10 04 01 10 2 4.4 -9 681.60 -51.2 -43.7 -50.1 68 -99 SPO 1997 10 04 01 11 2 4.4 -9 681.60 -51.4 -43.7 -50.1 70 -99 SPO 1997 10 04 01 12 359 4.2 -9 681.60 -51.5 -43.5 -50.2 72 -99 SPO 1997 10 04 01 13 359 4.0 -9 681.60 -51.5 -43.5 -50.2 72 -99 SPO 1997 10 04 01 14 1 4.1 -9 681.60 -51.5 -43.5 -50.2 71 -99 SPO 1997 10 04 01 15 2 4.2 -9 681.70 -51.7 -43.5 -50.2 73 -99 SPO 1997 10 04 01 16 6 4.1 -9 681.70 -51.5 -43.5 -50.2 71 -99 SPO 1997 10 04 01 17 19 2.8 -9 681.70 -52.0 -44.0 -50.4 75 -99 SPO 1997 10 04 01 18 20 3.3 -9 681.70 -51.7 -44.4 -50.4 71 -99 SPO 1997 10 04 01 19 30 3.1 -9 681.70 -50.9 -44.0 -50.2 66 -99 SPO 1997 10 04 01 20 50 2.5 -9 681.70 -51.0 -44.5 -50.3 68 -99 SPO 1997 10 04 01 21 65 2.4 -9 681.70 -51.9 -45.2 -50.8 76 -99 SPO 1997 10 04 01 22 58 2.6 -9 681.70 -51.0 -45.7 -50.6 67 -99 SPO 1997 10 04 01 23 45 2.8 -9 681.60 -50.4 -45.4 -50.0 63 -99 SPO 1997 10 04 01 24 50 2.4 -9 681.60 -52.0 -45.7 -50.8 76 -99 SPO 1997 10 04 01 25 42 2.3 -9 681.70 -51.7 -45.7 -51.0 71 -99 SPO 1997 10 04 01 26 37 2.3 -9 681.70 -50.7 -45.2 -50.3 63 -99 SPO 1997 10 04 01 27 34 2.4 -9 681.60 -52.0 -44.7 -50.9 73 -99 SPO 1997 10 04 01 28 38 2.4 -9 681.60 -53.2 -44.7 -51.9 79 -99 SPO 1997 10 04 01 29 33 2.5 -9 681.60 -53.5 -44.5 -52.4 77 -99 SPO 1997 10 04 01 30 36 2.6 -9 681.60 -53.7 -44.5 -52.6 74 -99 SPO 1997 10 04 01 31 38 2.5 -9 681.60 -54.0 -44.7 -53.0 73 -99 SPO 1997 10 04 01 32 36 2.5 -9 681.60 -54.0 -44.5 -53.2 70 -99 SPO 1997 10 04 01 33 51 2.6 -9 681.60 -54.2 -44.7 -53.4 70 -99 SPO 1997 10 04 01 34 41 2.7 -9 681.60 -54.2 -44.9 -53.5 67 -99 SPO 1997 10 04 01 35 33 2.7 -9 681.60 -54.2 -44.4 -53.6 65 -99 SPO 1997 10 04 01 36 39 2.8 -9 681.60 -54.2 -44.0 -53.6 64 -99 SPO 1997 10 04 01 37 37 3.0 -9 681.60 -54.2 -43.7 -53.8 62 -99 SPO 1997 10 04 01 38 36 3.0 -9 681.50 -54.4 -43.5 -53.8 63 -99 SPO 1997 10 04 01 39 37 3.2 -9 681.50 -54.4 -43.5 -54.0 63 -99 SPO 1997 10 04 01 40 33 3.3 -9 681.50 -54.5 -43.5 -54.0 63 -99 SPO 1997 10 04 01 41 34 3.3 -9 681.50 -54.5 -43.4 -54.1 63 -99 SPO 1997 10 04 01 42 30 3.6 -9 681.50 -54.5 -43.2 -54.0 63 -99 SPO 1997 10 04 01 43 27 4.0 -9 681.40 -54.2 -43.0 -53.8 61 -99 SPO 1997 10 04 01 44 27 4.2 -9 681.40 -54.2 -42.9 -53.7 63 -99 SPO 1997 10 04 01 45 31 4.5 -9 681.30 -54.0 -42.9 -53.5 63 -99 SPO 1997 10 04 01 46 33 4.4 -9 681.30 -53.4 -42.9 -52.9 59 -99 SPO 1997 10 04 01 47 28 4.1 -9 681.30 -53.0 -42.9 -52.7 58 -99 SPO 1997 10 04 01 48 23 3.7 -9 681.40 -52.9 -43.0 -52.7 59 -99 SPO 1997 10 04 01 49 18 3.5 -9 681.40 -53.0 -43.2 -52.8 61 -99 SPO 1997 10 04 01 50 13 3.4 -9 681.50 -53.0 -43.2 -52.8 62 -99 SPO 1997 10 04 01 51 13 3.4 -9 681.40 -52.7 -43.0 -52.6 62 -99 SPO 1997 10 04 01 52 14 3.2 -9 681.40 -52.5 -43.0 -52.4 62 -99 SPO 1997 10 04 01 53 13 3.2 -9 681.40 -52.5 -43.0 -52.4 65 -99 SPO 1997 10 04 01 54 17 3.5 -9 681.40 -52.9 -43.0 -52.6 68 -99 SPO 1997 10 04 01 55 17 3.5 -9 681.40 -52.7 -43.0 -52.4 66 -99 SPO 1997 10 04 01 56 16 3.3 -9 681.40 -52.7 -43.0 -52.3 67 -99 SPO 1997 10 04 01 57 12 3.4 -9 681.40 -53.0 -43.0 -52.6 68 -99 SPO 1997 10 04 01 58 11 3.6 -9 681.40 -53.2 -43.2 -52.8 -99 -99 SPO 1997 10 04 01 59 13 3.7 -9 681.40 -53.2 -43.2 -52.8 -99 -99 SPO 1997 10 04 02 00 17 4.1 -9 681.40 -53.5 -43.2 -53.0 -99 0 SPO 1997 10 04 02 01 20 4.0 -9 681.40 -53.9 -43.4 -53.2 -99 -99 SPO 1997 10 04 02 02 17 4.0 -9 681.40 -54.0 -43.2 -53.4 -99 -99 SPO 1997 10 04 02 03 12 4.0 -9 681.40 -54.2 -43.2 -53.4 -99 -99 SPO 1997 10 04 02 04 9 3.9 -9 681.40 -54.2 -43.0 -53.1 -99 -99 SPO 1997 10 04 02 05 9 3.8 -9 681.40 -54.4 -43.0 -52.8 -99 -99 SPO 1997 10 04 02 06 4 3.5 -9 681.40 -54.2 -43.2 -52.5 -99 -99 SPO 1997 10 04 02 07 1 3.4 -9 681.50 -51.8 -43.0 -51.4 -99 -99 SPO 1997 10 04 02 08 360 3.5 -9 681.50 -52.1 -43.0 -50.9 -99 -99 SPO 1997 10 04 02 09 1 3.7 -9 681.50 -53.0 -43.2 -51.3 -99 -99 SPO 1997 10 04 02 10 360 3.6 -9 681.50 -52.2 -43.2 -51.3 -99 -99 SPO 1997 10 04 02 11 357 3.6 -9 681.50 -51.3 -43.2 -50.8 -99 -99 SPO 1997 10 04 02 12 352 3.6 -9 681.50 -51.0 -43.2 -50.5 -99 -99 SPO 1997 10 04 02 13 349 3.5 -9 681.50 -50.8 -43.2 -50.2 -99 -99 SPO 1997 10 04 02 14 346 3.5 -9 681.50 -50.4 -43.2 -49.9 -99 -99 SPO 1997 10 04 02 15 346 3.5 -9 681.50 -50.0 -43.2 -49.6 -99 -99 SPO 1997 10 04 02 16 349 3.5 -9 681.40 -50.0 -43.2 -49.5 -99 -99 SPO 1997 10 04 02 17 351 3.6 -9 681.40 -49.8 -43.2 -49.4 -99 -99 SPO 1997 10 04 02 18 350 3.6 -9 681.40 -49.8 -43.2 -49.3 -99 -99 SPO 1997 10 04 02 19 347 3.5 -9 681.40 -49.9 -43.0 -49.4 -99 -99 SPO 1997 10 04 02 20 346 3.6 -9 681.40 -49.8 -43.0 -49.3 -99 -99 SPO 1997 10 04 02 21 345 3.8 -9 681.40 -50.0 -43.0 -49.3 -99 -99 SPO 1997 10 04 02 22 346 3.9 -9 681.40 -50.4 -43.0 -49.5 -99 -99 SPO 1997 10 04 02 23 347 3.9 -9 681.40 -51.1 -42.9 -49.8 -99 -99 SPO 1997 10 04 02 24 347 4.0 -9 681.40 -52.0 -43.0 -50.2 -99 -99 SPO 1997 10 04 02 25 348 4.1 -9 681.40 -52.2 -43.2 -50.3 -99 -99 SPO 1997 10 04 02 26 346 4.1 -9 681.40 -51.8 -43.4 -50.1 -99 -99 SPO 1997 10 04 02 27 347 4.1 -9 681.40 -51.4 -43.7 -50.0 -99 -99 SPO 1997 10 04 02 28 351 3.7 -9 681.40 -51.1 -43.9 -49.9 -99 -99 SPO 1997 10 04 02 29 355 3.0 -9 681.50 -51.6 -44.7 -50.0 -99 -99 SPO 1997 10 04 02 30 350 3.8 -9 681.50 -50.9 -44.7 -49.7 -99 -99 SPO 1997 10 04 02 31 353 3.8 -9 681.50 -50.0 -44.4 -49.1 -99 -99 SPO 1997 10 04 02 32 358 3.2 -9 681.50 -52.6 -44.5 -49.4 -99 -99 SPO 1997 10 04 02 33 0 2.9 -9 681.50 -53.2 -45.2 -50.2 -99 -99 SPO 1997 10 04 02 34 4 2.7 -9 681.50 -52.2 -45.5 -50.1 -99 -99 SPO 1997 10 04 02 35 13 2.1 -9 681.50 -51.4 -46.4 -50.1 -99 -99 SPO 1997 10 04 02 36 25 1.6 -9 681.50 -50.6 -46.9 -49.7 -99 -99 SPO 1997 10 04 02 37 12 1.7 -9 681.50 -50.2 -47.0 -49.3 -99 -99 SPO 1997 10 04 02 38 2 2.6 -9 681.50 -49.8 -47.0 -49.1 -99 -99 SPO 1997 10 04 02 39 356 3.2 -9 681.40 -49.6 -46.5 -49.0 -99 -99 SPO 1997 10 04 02 40 357 3.2 -9 681.40 -49.6 -46.5 -48.9 -99 -99 SPO 1997 10 04 02 41 9 2.3 -9 681.50 -50.8 -47.0 -49.0 -99 -99 SPO 1997 10 04 02 42 22 2.0 -9 681.50 -52.0 -47.4 -49.7 -99 -99 SPO 1997 10 04 02 43 30 2.0 -9 681.50 -51.4 -47.5 -49.6 -99 -99 SPO 1997 10 04 02 44 41 1.7 -9 681.50 -52.0 -47.7 -49.6 -99 -99 SPO 1997 10 04 02 45 32 1.7 -9 681.50 -54.4 -47.9 -50.7 -99 -99 SPO 1997 10 04 02 46 13 2.5 -9 681.50 -54.8 -47.9 -51.2 -99 -99 SPO 1997 10 04 02 47 30 2.2 -9 681.50 -55.2 -48.0 -51.6 -99 -99 SPO 1997 10 04 02 48 34 2.2 -9 681.50 -55.5 -48.0 -52.2 -99 -99 SPO 1997 10 04 02 49 23 2.4 -9 681.50 -55.4 -48.0 -52.2 -99 -99 SPO 1997 10 04 02 50 24 2.1 -9 681.50 -55.4 -48.0 -52.1 -99 -99 SPO 1997 10 04 02 51 23 2.2 -9 681.40 -55.3 -48.0 -52.3 -99 -99 SPO 1997 10 04 02 52 19 2.4 -9 681.40 -55.1 -47.5 -52.4 -99 -99 SPO 1997 10 04 02 53 22 2.1 -9 681.40 -55.4 -47.4 -52.6 -99 -99 SPO 1997 10 04 02 54 21 2.1 -9 681.40 -55.2 -47.4 -52.7 -99 -99 SPO 1997 10 04 02 55 21 2.2 -9 681.40 -55.0 -47.0 -52.8 -99 -99 SPO 1997 10 04 02 56 20 2.4 -9 681.40 -55.1 -46.7 -52.8 -99 -99 SPO 1997 10 04 02 57 18 2.4 -9 681.40 -55.2 -46.4 -52.8 -99 -99 SPO 1997 10 04 02 58 19 2.4 -9 681.40 -54.9 -46.0 -52.8 -99 -99 SPO 1997 10 04 02 59 30 2.4 -9 681.50 -55.2 -46.2 -52.9 -99 -99 SPO 1997 10 04 03 00 44 2.3 -9 681.50 -55.6 -47.2 -53.2 -99 0 SPO 1997 10 04 03 01 45 2.4 -9 681.40 -55.7 -47.5 -53.6 -99 -99 SPO 1997 10 04 03 02 39 2.3 -9 681.40 -55.5 -47.5 -53.8 65 -99 SPO 1997 10 04 03 03 46 2.2 -9 681.40 -55.7 -47.5 -53.9 66 -99 SPO 1997 10 04 03 04 42 2.5 -9 681.40 -55.7 -47.4 -54.0 66 -99 SPO 1997 10 04 03 05 43 2.5 -9 681.40 -55.7 -47.2 -54.0 66 -99 SPO 1997 10 04 03 06 41 2.5 -9 681.40 -55.7 -46.5 -54.1 66 -99 SPO 1997 10 04 03 07 44 2.6 -9 681.40 -55.5 -45.9 -54.1 65 -99 SPO 1997 10 04 03 08 51 2.7 -9 681.50 -55.7 -46.5 -54.2 67 -99 SPO 1997 10 04 03 09 47 2.6 -9 681.50 -55.5 -47.0 -54.2 65 -99 SPO 1997 10 04 03 10 41 2.6 -9 681.50 -55.5 -46.7 -54.2 65 -99 SPO 1997 10 04 03 11 37 2.5 -9 681.50 -55.5 -46.4 -54.2 65 -99 SPO 1997 10 04 03 12 36 2.4 -9 681.50 -55.4 -46.2 -54.1 64 -99 SPO 1997 10 04 03 13 40 2.5 -9 681.50 -55.5 -46.2 -54.2 65 -99 SPO 1997 10 04 03 14 49 2.3 -9 681.50 -55.5 -46.9 -54.2 65 -99 SPO 1997 10 04 03 15 56 2.4 -9 681.50 -55.5 -47.0 -54.2 65 -99 SPO 1997 10 04 03 16 51 2.4 -9 681.60 -55.5 -47.2 -54.2 65 -99 SPO 1997 10 04 03 17 45 2.4 -9 681.60 -55.5 -46.5 -54.3 65 -99 SPO 1997 10 04 03 18 51 2.4 -9 681.60 -55.5 -46.5 -54.4 66 -99 SPO 1997 10 04 03 19 47 2.4 -9 681.60 -55.5 -46.5 -54.4 66 -99 SPO 1997 10 04 03 20 43 2.4 -9 681.60 -55.5 -46.2 -54.6 66 -99 SPO 1997 10 04 03 21 44 2.3 -9 681.60 -55.5 -46.0 -54.6 65 -99 SPO 1997 10 04 03 22 46 2.2 -9 681.60 -55.5 -46.0 -54.6 65 -99 SPO 1997 10 04 03 23 46 2.2 -9 681.60 -55.5 -45.7 -54.6 65 -99 SPO 1997 10 04 03 24 45 2.2 -9 681.60 -55.5 -45.5 -54.6 65 -99 SPO 1997 10 04 03 25 36 2.3 -9 681.60 -55.5 -45.4 -54.6 65 -99 SPO 1997 10 04 03 26 32 2.4 -9 681.50 -55.5 -45.2 -54.6 65 -99 SPO 1997 10 04 03 27 29 2.5 -9 681.50 -55.7 -45.2 -54.7 68 -99 SPO 1997 10 04 03 28 32 2.5 -9 681.50 -55.5 -45.2 -54.8 66 -99 SPO 1997 10 04 03 29 40 2.5 -9 681.50 -55.7 -45.4 -54.9 68 -99 SPO 1997 10 04 03 30 38 2.7 -9 681.50 -55.5 -45.2 -54.8 65 -99 SPO 1997 10 04 03 31 40 2.7 -9 681.50 -55.5 -45.4 -54.8 66 -99 SPO 1997 10 04 03 32 34 2.6 -9 681.50 -55.5 -45.4 -54.8 65 -99 SPO 1997 10 04 03 33 30 2.6 -9 681.50 -55.5 -45.2 -54.8 65 -99 SPO 1997 10 04 03 34 27 2.7 -9 681.40 -55.5 -45.2 -54.8 65 -99 SPO 1997 10 04 03 35 24 2.8 -9 681.40 -55.5 -45.2 -54.8 65 -99 SPO 1997 10 04 03 36 24 2.6 -9 681.40 -55.5 -45.2 -54.8 65 -99 SPO 1997 10 04 03 37 25 2.4 -9 681.40 -55.7 -45.2 -54.8 65 -99 SPO 1997 10 04 03 38 34 2.4 -9 681.40 -55.7 -45.4 -54.8 66 -99 SPO 1997 10 04 03 39 34 2.4 -9 681.40 -55.7 -45.4 -54.8 66 -99 SPO 1997 10 04 03 40 36 2.4 -9 681.40 -55.7 -45.2 -54.8 66 -99 SPO 1997 10 04 03 41 44 2.5 -9 681.40 -55.7 -45.5 -54.8 66 -99 SPO 1997 10 04 03 42 46 2.5 -9 681.40 -55.9 -45.7 -54.9 68 -99 SPO 1997 10 04 03 43 47 2.7 -9 681.40 -55.7 -45.9 -54.9 65 -99 SPO 1997 10 04 03 44 38 2.7 -9 681.40 -55.7 -45.7 -55.0 66 -99 SPO 1997 10 04 03 45 35 2.7 -9 681.40 -55.7 -45.5 -55.0 66 -99 SPO 1997 10 04 03 46 47 2.8 -9 681.40 -55.7 -45.5 -55.0 65 -99 SPO 1997 10 04 03 47 54 3.0 -9 681.50 -55.9 -45.4 -55.1 67 -99 SPO 1997 10 04 03 48 44 2.7 -9 681.40 -55.7 -45.2 -55.1 65 -99 SPO 1997 10 04 03 49 35 2.6 -9 681.40 -55.7 -45.0 -55.0 64 -99 SPO 1997 10 04 03 50 39 2.7 -9 681.40 -55.7 -45.2 -55.0 65 -99 SPO 1997 10 04 03 51 43 2.9 -9 681.40 -55.9 -45.2 -55.1 67 -99 SPO 1997 10 04 03 52 37 2.9 -9 681.40 -56.0 -45.2 -55.1 67 -99 SPO 1997 10 04 03 53 27 2.8 -9 681.40 -56.0 -45.0 -55.1 67 -99 SPO 1997 10 04 03 54 22 2.7 -9 681.40 -55.9 -44.7 -55.0 66 -99 SPO 1997 10 04 03 55 25 2.8 -9 681.40 -56.0 -44.7 -55.0 68 -99 SPO 1997 10 04 03 56 26 2.9 -9 681.40 -56.0 -44.5 -55.1 67 -99 SPO 1997 10 04 03 57 30 3.0 -9 681.40 -56.0 -44.5 -55.1 67 -99 SPO 1997 10 04 03 58 21 2.8 -9 681.40 -55.9 -44.5 -55.1 67 -99 SPO 1997 10 04 03 59 16 2.8 -9 681.40 -55.9 -44.5 -55.0 66 -99 SPO 1997 10 04 04 00 19 2.9 -9 681.40 -56.0 -44.5 -55.0 66 0 SPO 1997 10 04 04 01 21 2.9 -9 681.40 -56.0 -44.5 -55.0 66 -99 SPO 1997 10 04 04 02 20 2.8 -9 681.40 -56.0 -44.5 -55.1 66 -99 SPO 1997 10 04 04 03 17 2.9 -9 681.30 -56.0 -44.4 -55.1 65 -99 SPO 1997 10 04 04 04 17 3.0 -9 681.30 -56.0 -44.4 -55.0 65 -99 SPO 1997 10 04 04 05 28 3.0 -9 681.40 -56.0 -45.0 -55.1 66 -99 SPO 1997 10 04 04 06 18 2.9 -9 681.30 -56.0 -45.0 -55.0 66 -99 SPO 1997 10 04 04 07 16 2.9 -9 681.40 -55.7 -44.7 -54.8 65 -99 SPO 1997 10 04 04 08 22 3.0 -9 681.30 -55.7 -44.5 -54.7 66 -99 SPO 1997 10 04 04 09 25 3.0 -9 681.30 -55.7 -45.2 -54.8 67 -99 SPO 1997 10 04 04 10 30 3.1 -9 681.40 -55.7 -45.5 -54.8 67 -99 SPO 1997 10 04 04 11 22 3.0 -9 681.40 -55.5 -46.0 -54.7 65 -99 SPO 1997 10 04 04 12 17 2.8 -9 681.40 -55.5 -46.4 -54.6 65 -99 SPO 1997 10 04 04 13 31 3.2 -9 681.40 -55.5 -46.7 -54.6 66 -99 SPO 1997 10 04 04 14 26 3.3 -9 681.40 -55.7 -46.9 -54.7 68 -99 SPO 1997 10 04 04 15 24 3.1 -9 681.40 -55.7 -46.7 -54.7 67 -99 SPO 1997 10 04 04 16 26 3.1 -9 681.40 -55.9 -46.5 -54.8 69 -99 SPO 1997 10 04 04 17 25 3.4 -9 681.40 -55.9 -46.5 -54.9 69 -99 SPO 1997 10 04 04 18 22 3.4 -9 681.40 -55.7 -46.5 -54.8 67 -99 SPO 1997 10 04 04 19 25 3.6 -9 681.40 -55.7 -46.5 -54.9 67 -99 SPO 1997 10 04 04 20 24 3.8 -9 681.40 -55.7 -46.7 -54.9 68 -99 SPO 1997 10 04 04 21 25 4.1 -9 681.40 -55.7 -46.9 -55.0 68 -99 SPO 1997 10 04 04 22 22 4.1 -9 681.40 -55.7 -46.7 -55.0 68 -99 SPO 1997 10 04 04 23 26 4.3 -9 681.40 -55.5 -46.5 -54.9 66 -99 SPO 1997 10 04 04 24 30 4.7 -9 681.40 -55.5 -46.7 -54.9 67 -99 SPO 1997 10 04 04 25 35 4.6 -9 681.30 -55.5 -46.7 -55.0 67 -99 SPO 1997 10 04 04 26 32 4.4 -9 681.30 -55.7 -46.5 -55.2 69 -99 SPO 1997 10 04 04 27 30 4.7 -9 681.30 -55.7 -46.2 -55.1 68 -99 SPO 1997 10 04 04 28 40 4.9 -9 681.30 -55.5 -46.7 -55.0 66 -99 SPO 1997 10 04 04 29 27 4.8 -9 681.30 -55.5 -46.5 -55.1 66 -99 SPO 1997 10 04 04 30 24 4.5 -9 681.30 -55.5 -45.0 -55.0 66 -99 SPO 1997 10 04 04 31 26 4.6 -9 681.30 -55.5 -44.5 -55.0 67 -99 SPO 1997 10 04 04 32 30 5.0 -9 681.30 -55.7 -45.5 -55.2 69 -99 SPO 1997 10 04 04 33 27 5.1 -9 681.30 -55.7 -46.2 -55.2 68 -99 SPO 1997 10 04 04 34 25 4.9 -9 681.20 -55.7 -45.7 -55.2 67 -99 SPO 1997 10 04 04 35 26 4.8 -9 681.20 -55.7 -45.0 -55.2 66 -99 SPO 1997 10 04 04 36 27 4.7 -9 681.20 -55.5 -45.2 -55.2 65 -99 SPO 1997 10 04 04 37 23 4.8 -9 681.20 -55.5 -45.9 -55.1 65 -99 SPO 1997 10 04 04 38 24 4.9 -9 681.20 -55.5 -46.2 -55.0 65 -99 SPO 1997 10 04 04 39 24 4.7 -9 681.20 -55.5 -46.4 -55.1 65 -99 SPO 1997 10 04 04 40 19 4.8 -9 681.20 -55.7 -46.0 -55.2 66 -99 SPO 1997 10 04 04 41 16 4.8 -9 681.30 -55.5 -46.2 -55.0 65 -99 SPO 1997 10 04 04 42 17 4.5 -9 681.30 -55.5 -46.5 -55.0 66 -99 SPO 1997 10 04 04 43 19 4.2 -9 681.20 -55.5 -46.7 -54.9 67 -99 SPO 1997 10 04 04 44 15 4.5 -9 681.20 -55.4 -47.0 -54.9 67 -99 SPO 1997 10 04 04 45 11 4.6 -9 681.20 -55.4 -47.2 -54.8 68 -99 SPO 1997 10 04 04 46 12 4.8 -9 681.30 -55.2 -47.2 -54.7 67 -99 SPO 1997 10 04 04 47 11 4.6 -9 681.30 -55.0 -47.4 -54.6 66 -99 SPO 1997 10 04 04 48 9 4.6 -9 681.30 -54.7 -47.4 -54.4 65 -99 SPO 1997 10 04 04 49 9 4.8 -9 681.20 -54.5 -47.5 -54.2 64 -99 SPO 1997 10 04 04 50 11 5.2 -9 681.20 -54.4 -47.5 -54.1 64 -99 SPO 1997 10 04 04 51 12 5.1 -9 681.20 -54.5 -47.7 -54.1 65 -99 SPO 1997 10 04 04 52 15 5.0 -9 681.20 -54.5 -47.9 -54.1 67 -99 SPO 1997 10 04 04 53 14 4.7 -9 681.20 -54.5 -48.0 -54.1 68 -99 SPO 1997 10 04 04 54 13 4.4 -9 681.20 -54.5 -48.0 -54.0 69 -99 SPO 1997 10 04 04 55 16 4.3 -9 681.20 -54.5 -48.0 -54.0 69 -99 SPO 1997 10 04 04 56 19 4.2 -9 681.20 -54.5 -48.0 -54.0 70 -99 SPO 1997 10 04 04 57 22 4.5 -9 681.20 -54.5 -48.2 -53.9 70 -99 SPO 1997 10 04 04 58 23 4.8 -9 681.20 -54.5 -48.2 -54.0 70 -99 SPO 1997 10 04 04 59 23 5.0 -9 681.10 -54.2 -48.2 -53.8 68 -99 SPO 1997 10 04 05 00 22 4.9 -9 681.10 -54.2 -48.2 -53.8 69 0 SPO 1997 10 04 05 01 19 4.8 -9 681.10 -54.0 -48.0 -53.6 68 -99 SPO 1997 10 04 05 02 16 5.0 -9 681.10 -53.7 -48.0 -53.4 67 -99 SPO 1997 10 04 05 03 12 5.6 -9 681.10 -53.5 -48.0 -53.2 66 -99 SPO 1997 10 04 05 04 10 5.8 -9 681.10 -53.2 -48.0 -52.9 65 -99 SPO 1997 10 04 05 05 9 5.8 -9 681.10 -52.9 -48.0 -52.7 65 -99 SPO 1997 10 04 05 06 8 5.7 -9 681.10 -52.7 -47.9 -52.6 65 -99 SPO 1997 10 04 05 07 8 6.0 -9 681.10 -52.7 -47.9 -52.6 66 -99 SPO 1997 10 04 05 08 8 5.9 -9 681.10 -52.5 -47.9 -52.4 66 -99 SPO 1997 10 04 05 09 6 5.5 -9 681.10 -52.5 -47.7 -52.3 68 -99 SPO 1997 10 04 05 10 7 5.6 -9 681.10 -52.5 -47.7 -52.3 69 -99 SPO 1997 10 04 05 11 8 5.7 -9 681.10 -52.5 -47.7 -52.3 69 -99 SPO 1997 10 04 05 12 10 5.8 -9 681.10 -52.5 -47.7 -52.3 69 -99 SPO 1997 10 04 05 13 12 5.8 -9 681.10 -52.7 -47.7 -52.4 72 -99 SPO 1997 10 04 05 14 10 5.9 -9 681.10 -52.7 -47.7 -52.4 71 -99 SPO 1997 10 04 05 15 10 6.0 -9 681.10 -52.7 -47.7 -52.5 71 -99 SPO 1997 10 04 05 16 13 5.9 -9 681.10 -52.7 -48.0 -52.5 70 -99 SPO 1997 10 04 05 17 17 5.6 -9 681.10 -52.9 -48.0 -52.5 71 -99 SPO 1997 10 04 05 18 20 5.5 -9 681.10 -53.0 -48.2 -52.6 72 -99 SPO 1997 10 04 05 19 17 5.7 -9 681.10 -53.0 -48.4 -52.7 72 -99 SPO 1997 10 04 05 20 14 5.8 -9 681.00 -53.0 -48.2 -52.7 71 -99 SPO 1997 10 04 05 21 12 6.1 -9 681.00 -53.0 -48.2 -52.7 70 -99 SPO 1997 10 04 05 22 12 6.4 -9 681.00 -53.0 -48.2 -52.7 70 -99 SPO 1997 10 04 05 23 9 6.3 -9 681.00 -53.0 -48.2 -52.7 70 -99 SPO 1997 10 04 05 24 9 6.6 -9 681.00 -52.9 -48.2 -52.6 69 -99 SPO 1997 10 04 05 25 7 6.7 -9 680.90 -52.7 -48.2 -52.5 68 -99 SPO 1997 10 04 05 26 7 6.8 -9 681.00 -52.7 -48.2 -52.5 68 -99 SPO 1997 10 04 05 27 5 6.7 -9 681.00 -52.7 -48.2 -52.5 68 -99 SPO 1997 10 04 05 28 4 6.6 -9 681.00 -52.7 -48.0 -52.4 68 -99 SPO 1997 10 04 05 29 5 6.4 -9 681.00 -52.7 -48.0 -52.4 68 -99 SPO 1997 10 04 05 30 4 6.4 -9 681.00 -52.7 -48.0 -52.5 68 -99 SPO 1997 10 04 05 31 3 6.3 -9 681.00 -52.9 -48.0 -52.5 69 -99 SPO 1997 10 04 05 32 1 6.2 -9 681.00 -53.0 -48.2 -52.6 70 -99 SPO 1997 10 04 05 33 359 6.0 -9 681.00 -53.0 -48.0 -52.6 70 -99 SPO 1997 10 04 05 34 0 6.0 -9 681.00 -53.0 -47.9 -52.6 70 -99 SPO 1997 10 04 05 35 359 5.8 -9 681.00 -53.0 -47.9 -52.6 70 -99 SPO 1997 10 04 05 36 359 5.8 -9 681.00 -53.0 -48.0 -52.7 70 -99 SPO 1997 10 04 05 37 359 5.8 -9 681.00 -53.2 -48.2 -52.7 71 -99 SPO 1997 10 04 05 38 359 5.8 -9 681.10 -53.2 -48.2 -52.8 70 -99 SPO 1997 10 04 05 39 359 5.5 -9 681.10 -53.2 -48.4 -52.8 70 -99 SPO 1997 10 04 05 40 359 5.1 -9 681.10 -53.4 -48.5 -52.8 71 -99 SPO 1997 10 04 05 41 360 5.0 -9 681.20 -53.1 -48.7 -52.8 68 -99 SPO 1997 10 04 05 42 2 4.9 -9 681.20 -53.2 -48.7 -52.9 68 -99 SPO 1997 10 04 05 43 6 4.9 -9 681.20 -53.2 -48.9 -52.9 67 -99 SPO 1997 10 04 05 44 9 4.6 -9 681.20 -53.4 -49.2 -53.0 68 -99 SPO 1997 10 04 05 45 16 3.7 -9 681.20 -53.7 -49.5 -53.0 69 -99 SPO 1997 10 04 05 46 26 2.2 -9 681.20 -54.5 -49.7 -53.1 74 -99 SPO 1997 10 04 05 47 39 1.5 -9 681.20 -54.8 -50.0 -53.1 75 -99 SPO 1997 10 04 05 48 32 1.6 -9 681.30 -54.3 -50.2 -53.0 67 -99 SPO 1997 10 04 05 49 27 2.2 -9 681.30 -54.0 -50.2 -53.0 65 -99 SPO 1997 10 04 05 50 28 2.8 -9 681.30 -53.8 -50.0 -53.0 64 -99 SPO 1997 10 04 05 51 39 2.6 -9 681.30 -54.4 -50.2 -53.0 70 -99 SPO 1997 10 04 05 52 45 2.2 -9 681.30 -56.4 -50.5 -53.8 85 -99 SPO 1997 10 04 05 53 43 2.0 -9 681.30 -56.7 -50.9 -54.5 81 -99 SPO 1997 10 04 05 54 39 2.5 -9 681.20 -55.8 -50.7 -54.3 69 -99 SPO 1997 10 04 05 55 36 2.9 -9 681.20 -55.4 -50.7 -54.1 62 -99 SPO 1997 10 04 05 56 31 3.1 -9 681.20 -56.5 -50.7 -54.5 71 -99 SPO 1997 10 04 05 57 32 3.5 -9 681.20 -56.8 -50.7 -55.0 72 -99 SPO 1997 10 04 05 58 35 3.4 -9 681.20 -57.4 -50.7 -55.4 75 -99 SPO 1997 10 04 05 59 34 3.6 -9 681.20 -57.7 -50.7 -55.7 74 -99 SPO 1997 10 04 06 00 33 4.2 -9 681.20 -56.5 -50.7 -55.2 61 0 SPO 1997 10 04 06 01 32 4.2 -9 681.10 -55.2 -50.5 -54.4 52 -99 SPO 1997 10 04 06 02 30 4.1 -9 681.20 -54.6 -50.5 -53.9 51 -99 SPO 1997 10 04 06 03 30 4.2 -9 681.20 -54.4 -50.5 -53.8 53 -99 SPO 1997 10 04 06 04 30 4.1 -9 681.10 -54.3 -50.5 -53.8 56 -99 SPO 1997 10 04 06 05 30 4.3 -9 681.10 -54.4 -50.5 -54.0 60 -99 SPO 1997 10 04 06 06 27 4.5 -9 681.10 -54.6 -50.4 -54.0 62 -99 SPO 1997 10 04 06 07 25 4.3 -9 681.10 -54.6 -50.2 -54.0 63 -99 SPO 1997 10 04 06 08 23 4.5 -9 681.20 -54.2 -50.2 -53.8 60 -99 SPO 1997 10 04 06 09 24 4.5 -9 681.20 -53.9 -50.2 -53.6 60 -99 SPO 1997 10 04 06 10 24 4.6 -9 681.20 -53.7 -50.4 -53.4 61 -99 SPO 1997 10 04 06 11 23 4.7 -9 681.20 -53.7 -50.4 -53.4 63 -99 SPO 1997 10 04 06 12 21 5.0 -9 681.20 -53.6 -50.2 -53.3 64 -99 SPO 1997 10 04 06 13 18 5.4 -9 681.20 -53.5 -50.2 -53.2 64 -99 SPO 1997 10 04 06 14 14 5.8 -9 681.20 -53.4 -50.2 -53.2 65 -99 SPO 1997 10 04 06 15 9 6.2 -9 681.10 -53.2 -50.0 -53.0 64 -99 SPO 1997 10 04 06 16 7 6.4 -9 681.10 -53.2 -50.0 -53.0 65 -99 SPO 1997 10 04 06 17 7 6.4 -9 681.10 -53.4 -49.9 -52.9 68 -99 SPO 1997 10 04 06 18 8 6.4 -9 681.10 -53.4 -49.7 -52.9 68 -99 SPO 1997 10 04 06 19 9 6.4 -9 681.10 -53.4 -49.7 -52.8 68 -99 SPO 1997 10 04 06 20 8 6.5 -9 681.10 -53.4 -49.7 -52.8 68 -99 SPO 1997 10 04 06 21 9 6.5 -9 681.10 -53.2 -49.7 -52.8 67 -99 SPO 1997 10 04 06 22 8 6.5 -9 681.10 -53.2 -49.5 -52.8 67 -99 SPO 1997 10 04 06 23 7 6.6 -9 681.10 -53.2 -49.2 -52.7 68 -99 SPO 1997 10 04 06 24 9 6.7 -9 681.10 -53.2 -49.2 -52.7 68 -99 SPO 1997 10 04 06 25 7 6.6 -9 681.10 -53.2 -49.4 -52.8 68 -99 SPO 1997 10 04 06 26 6 6.6 -9 681.10 -53.2 -49.4 -52.8 68 -99 SPO 1997 10 04 06 27 7 6.7 -9 681.10 -53.2 -49.5 -52.8 68 -99 SPO 1997 10 04 06 28 7 6.7 -9 681.10 -53.2 -49.4 -52.7 68 -99 SPO 1997 10 04 06 29 8 6.6 -9 681.10 -53.2 -49.2 -52.7 68 -99 SPO 1997 10 04 06 30 9 6.5 -9 681.10 -53.2 -49.2 -52.7 68 -99 SPO 1997 10 04 06 31 11 6.4 -9 681.10 -53.4 -49.2 -52.8 68 -99 SPO 1997 10 04 06 32 13 6.3 -9 681.10 -53.4 -49.2 -52.8 68 -99 SPO 1997 10 04 06 33 13 6.4 -9 681.10 -53.5 -49.2 -52.9 68 -99 SPO 1997 10 04 06 34 12 6.5 -9 681.10 -53.5 -49.2 -52.9 68 -99 SPO 1997 10 04 06 35 10 6.6 -9 681.10 -53.4 -49.0 -52.9 68 -99 SPO 1997 10 04 06 36 8 6.7 -9 681.10 -53.4 -48.9 -52.8 68 -99 SPO 1997 10 04 06 37 7 6.8 -9 681.10 -53.2 -48.9 -52.7 67 -99 SPO 1997 10 04 06 38 5 6.9 -9 681.10 -53.0 -48.7 -52.6 66 -99 SPO 1997 10 04 06 39 4 6.8 -9 681.10 -53.0 -48.5 -52.5 66 -99 SPO 1997 10 04 06 40 3 6.7 -9 681.00 -52.9 -48.5 -52.4 67 -99 SPO 1997 10 04 06 41 3 6.8 -9 681.10 -52.9 -48.5 -52.4 68 -99 SPO 1997 10 04 06 42 2 6.8 -9 681.10 -52.7 -48.5 -52.4 66 -99 SPO 1997 10 04 06 43 360 6.8 -9 681.00 -52.7 -48.5 -52.3 66 -99 SPO 1997 10 04 06 44 359 6.9 -9 681.10 -52.7 -48.5 -52.4 66 -99 SPO 1997 10 04 06 45 357 6.9 -9 681.00 -52.7 -48.5 -52.4 65 -99 SPO 1997 10 04 06 46 357 6.9 -9 681.10 -52.9 -48.5 -52.4 67 -99 SPO 1997 10 04 06 47 357 6.8 -9 681.00 -52.7 -48.4 -52.3 66 -99 SPO 1997 10 04 06 48 357 6.8 -9 681.00 -52.7 -48.4 -52.3 66 -99 SPO 1997 10 04 06 49 357 6.7 -9 681.00 -52.7 -48.4 -52.2 67 -99 SPO 1997 10 04 06 50 360 6.8 -9 681.00 -52.7 -48.4 -52.2 68 -99 SPO 1997 10 04 06 51 358 6.8 -9 681.00 -52.7 -48.4 -52.2 69 -99 SPO 1997 10 04 06 52 357 6.6 -9 681.00 -52.7 -48.2 -52.2 69 -99 SPO 1997 10 04 06 53 355 6.5 -9 681.00 -52.7 -48.2 -52.2 69 -99 SPO 1997 10 04 06 54 354 6.4 -9 681.00 -52.7 -48.2 -52.1 69 -99 SPO 1997 10 04 06 55 354 6.3 -9 681.00 -52.5 -48.2 -52.1 67 -99 SPO 1997 10 04 06 56 355 6.2 -9 681.00 -52.5 -48.2 -52.1 66 -99 SPO 1997 10 04 06 57 354 6.1 -9 681.00 -52.7 -48.2 -52.1 67 -99 SPO 1997 10 04 06 58 354 6.1 -9 681.10 -52.7 -48.2 -52.2 67 -99 SPO 1997 10 04 06 59 354 6.0 -9 681.10 -52.7 -48.2 -52.2 67 -99 SPO 1997 10 04 07 00 353 5.9 -9 681.10 -52.7 -48.2 -52.2 67 0 SPO 1997 10 04 07 01 352 5.8 -9 681.10 -52.9 -48.2 -52.2 69 -99 SPO 1997 10 04 07 02 351 5.8 -9 681.10 -52.9 -48.0 -52.3 69 -99 SPO 1997 10 04 07 03 352 5.7 -9 681.10 -53.0 -48.0 -52.3 70 -99 SPO 1997 10 04 07 04 353 5.5 -9 681.10 -53.0 -48.0 -52.4 70 -99 SPO 1997 10 04 07 05 354 5.5 -9 681.10 -53.0 -48.0 -52.4 70 -99 SPO 1997 10 04 07 06 355 5.5 -9 681.10 -53.0 -48.0 -52.4 69 -99 SPO 1997 10 04 07 07 357 5.5 -9 681.10 -53.2 -47.9 -52.4 70 -99 SPO 1997 10 04 07 08 357 5.6 -9 681.10 -53.2 -47.7 -52.5 68 -99 SPO 1997 10 04 07 09 357 5.7 -9 681.00 -53.2 -47.7 -52.6 68 -99 SPO 1997 10 04 07 10 359 5.6 -9 681.10 -53.2 -47.7 -52.6 67 -99 SPO 1997 10 04 07 11 1 5.4 -9 681.10 -53.2 -47.7 -52.5 67 -99 SPO 1997 10 04 07 12 2 5.3 -9 681.20 -53.4 -48.0 -52.5 68 -99 SPO 1997 10 04 07 13 5 5.0 -9 681.20 -53.5 -48.0 -52.5 69 -99 SPO 1997 10 04 07 14 9 4.4 -9 681.20 -53.5 -48.2 -52.4 69 -99 SPO 1997 10 04 07 15 12 3.8 -9 681.20 -53.7 -48.9 -52.5 71 -99 SPO 1997 10 04 07 16 12 3.3 -9 681.20 -54.0 -49.4 -52.5 73 -99 SPO 1997 10 04 07 17 10 3.2 -9 681.20 -54.4 -49.5 -52.5 75 -99 SPO 1997 10 04 07 18 10 3.1 -9 681.20 -54.5 -49.4 -52.5 73 -99 SPO 1997 10 04 07 19 10 3.5 -9 681.20 -54.4 -49.0 -52.5 72 -99 SPO 1997 10 04 07 20 4 3.8 -9 681.20 -54.2 -48.5 -52.4 68 -99 SPO 1997 10 04 07 21 2 4.3 -9 681.20 -53.9 -48.4 -52.3 65 -99 SPO 1997 10 04 07 22 360 4.6 -9 681.20 -53.5 -48.2 -52.2 62 -99 SPO 1997 10 04 07 23 358 4.8 -9 681.20 -53.5 -48.0 -52.2 63 -99 SPO 1997 10 04 07 24 360 4.7 -9 681.20 -53.4 -47.9 -52.1 64 -99 SPO 1997 10 04 07 25 1 4.6 -9 681.20 -53.4 -48.0 -52.1 65 -99 SPO 1997 10 04 07 26 0 4.6 -9 681.20 -53.4 -48.0 -52.2 67 -99 SPO 1997 10 04 07 27 0 4.5 -9 681.10 -53.5 -47.9 -52.2 69 -99 SPO 1997 10 04 07 28 1 4.5 -9 681.20 -53.5 -47.7 -52.2 69 -99 SPO 1997 10 04 07 29 3 4.3 -9 681.20 -53.5 -47.9 -52.2 69 -99 SPO 1997 10 04 07 30 6 3.7 -9 681.20 -53.5 -48.0 -52.2 69 -99 SPO 1997 10 04 07 31 10 3.0 -9 681.20 -53.7 -48.2 -52.0 71 -99 SPO 1997 10 04 07 32 16 2.5 -9 681.20 -54.2 -48.7 -51.9 73 -99 SPO 1997 10 04 07 33 19 2.1 -9 681.20 -54.4 -49.2 -51.8 74 -99 SPO 1997 10 04 07 34 27 1.6 -9 681.30 -54.4 -49.9 -51.8 72 -99 SPO 1997 10 04 07 35 44 1.5 -9 681.30 -54.2 -50.5 -51.8 69 -99 SPO 1997 10 04 07 36 56 1.6 -9 681.20 -54.0 -51.0 -51.9 67 -99 SPO 1997 10 04 07 37 51 1.5 -9 681.20 -53.7 -51.4 -52.0 64 -99 SPO 1997 10 04 07 38 49 1.5 -9 681.20 -53.7 -51.5 -52.0 66 -99 SPO 1997 10 04 07 39 47 1.3 -9 681.30 -53.7 -51.4 -52.0 67 -99 SPO 1997 10 04 07 40 43 1.7 -9 681.20 -53.5 -51.2 -51.9 67 -99 SPO 1997 10 04 07 41 36 2.2 -9 681.20 -53.5 -50.5 -52.0 68 -99 SPO 1997 10 04 07 42 27 2.4 -9 681.20 -53.2 -50.0 -52.0 66 -99 SPO 1997 10 04 07 43 19 2.6 -9 681.20 -53.2 -49.7 -51.9 67 -99 SPO 1997 10 04 07 44 14 2.9 -9 681.20 -53.0 -49.4 -51.8 66 -99 SPO 1997 10 04 07 45 10 3.2 -9 681.20 -53.0 -48.7 -51.8 66 -99 SPO 1997 10 04 07 46 7 3.2 -9 681.20 -53.0 -48.4 -51.8 67 -99 SPO 1997 10 04 07 47 4 3.6 -9 681.20 -53.0 -48.2 -51.8 67 -99 SPO 1997 10 04 07 48 7 3.5 -9 681.20 -52.9 -48.2 -51.7 66 -99 SPO 1997 10 04 07 49 7 3.5 -9 681.20 -53.0 -48.4 -51.7 68 -99 SPO 1997 10 04 07 50 8 3.5 -9 681.20 -53.0 -48.4 -51.8 68 -99 SPO 1997 10 04 07 51 6 3.4 -9 681.20 -53.0 -48.4 -51.8 68 -99 SPO 1997 10 04 07 52 4 3.4 -9 681.20 -53.0 -48.4 -51.8 69 -99 SPO 1997 10 04 07 53 3 3.5 -9 681.20 -53.0 -48.4 -51.8 68 -99 SPO 1997 10 04 07 54 2 3.6 -9 681.20 -53.2 -48.4 -51.8 70 -99 SPO 1997 10 04 07 55 360 3.5 -9 681.20 -53.2 -48.4 -51.9 70 -99 SPO 1997 10 04 07 56 357 3.5 -9 681.20 -53.2 -48.2 -51.9 70 -99 SPO 1997 10 04 07 57 357 3.5 -9 681.20 -53.2 -48.2 -51.9 69 -99 SPO 1997 10 04 07 58 359 3.4 -9 681.20 -53.4 -48.2 -51.9 71 -99 SPO 1997 10 04 07 59 1 3.2 -9 681.20 -53.5 -48.2 -51.9 71 -99 SPO 1997 10 04 08 00 2 2.9 -9 681.20 -53.5 -48.5 -51.9 70 0 SPO 1997 10 04 08 01 7 2.7 -9 681.30 -53.7 -48.7 -51.8 71 -99 SPO 1997 10 04 08 02 9 2.2 -9 681.30 -53.9 -49.4 -51.8 71 -99 SPO 1997 10 04 08 03 9 1.8 -9 681.30 -53.9 -50.0 -51.8 71 -99 SPO 1997 10 04 08 04 11 1.7 -9 681.30 -53.9 -50.5 -51.7 70 -99 SPO 1997 10 04 08 05 13 1.7 -9 681.30 -53.7 -50.5 -51.7 69 -99 SPO 1997 10 04 08 06 12 2.0 -9 681.30 -53.7 -50.4 -51.7 69 -99 SPO 1997 10 04 08 07 14 2.3 -9 681.30 -53.5 -49.5 -51.8 68 -99 SPO 1997 10 04 08 08 17 2.6 -9 681.30 -52.9 -49.0 -52.0 65 -99 SPO 1997 10 04 08 09 17 2.4 -9 681.30 -54.0 -48.7 -52.1 75 -99 SPO 1997 10 04 08 10 20 2.0 -9 681.30 -56.0 -49.2 -52.8 91 -99 SPO 1997 10 04 08 11 27 1.5 -9 681.30 -54.8 -49.7 -52.8 73 -99 SPO 1997 10 04 08 12 31 1.6 -9 681.30 -54.5 -50.0 -52.6 68 -99 SPO 1997 10 04 08 13 27 1.9 -9 681.30 -55.2 -49.9 -52.7 73 -99 SPO 1997 10 04 08 14 22 2.1 -9 681.30 -57.7 -49.7 -53.6 93 -99 SPO 1997 10 04 08 15 20 2.0 -9 681.30 -58.7 -49.7 -54.8 94 -99 SPO 1997 10 04 08 16 24 1.9 -9 681.30 -58.9 -50.0 -55.6 85 -99 SPO 1997 10 04 08 17 23 2.2 -9 681.30 -58.9 -50.2 -55.8 76 -99 SPO 1997 10 04 08 18 17 2.2 -9 681.30 -58.9 -50.4 -55.9 70 -99 SPO 1997 10 04 08 19 18 2.3 -9 681.20 -58.9 -50.7 -56.0 66 -99 SPO 1997 10 04 08 20 18 2.5 -9 681.20 -58.9 -50.7 -56.0 63 -99 SPO 1997 10 04 08 21 16 2.5 -9 681.30 -58.8 -50.7 -56.0 60 -99 SPO 1997 10 04 08 22 18 2.4 -9 681.30 -58.7 -50.7 -55.9 58 -99 SPO 1997 10 04 08 23 14 2.4 -9 681.30 -58.6 -50.5 -55.9 57 -99 SPO 1997 10 04 08 24 17 2.3 -9 681.30 -58.9 -50.2 -56.1 59 -99 SPO 1997 10 04 08 25 18 2.3 -9 681.30 -58.9 -50.2 -56.3 59 -99 SPO 1997 10 04 08 26 18 2.3 -9 681.30 -58.9 -50.0 -56.3 59 -99 SPO 1997 10 04 08 27 16 2.3 -9 681.30 -58.9 -50.0 -56.2 59 -99 SPO 1997 10 04 08 28 15 2.3 -9 681.30 -58.9 -49.7 -56.1 58 -99 SPO 1997 10 04 08 29 18 2.4 -9 681.30 -58.9 -49.5 -56.1 58 -99 SPO 1997 10 04 08 30 20 2.3 -9 681.30 -58.7 -49.7 -56.2 57 -99 SPO 1997 10 04 08 31 22 2.4 -9 681.30 -58.7 -49.7 -56.2 57 -99 SPO 1997 10 04 08 32 25 2.4 -9 681.30 -58.7 -50.0 -56.3 58 -99 SPO 1997 10 04 08 33 36 2.4 -9 681.30 -58.7 -50.4 -56.4 59 -99 SPO 1997 10 04 08 34 38 2.4 -9 681.30 -58.7 -50.9 -56.7 59 -99 SPO 1997 10 04 08 35 36 2.5 -9 681.20 -58.7 -50.7 -57.0 60 -99 SPO 1997 10 04 08 36 35 2.7 -9 681.20 -58.7 -51.0 -57.3 60 -99 SPO 1997 10 04 08 37 36 2.6 -9 681.20 -58.7 -51.0 -57.5 61 -99 SPO 1997 10 04 08 38 33 2.5 -9 681.30 -58.7 -51.0 -57.6 61 -99 SPO 1997 10 04 08 39 28 2.4 -9 681.30 -58.7 -50.9 -57.5 61 -99 SPO 1997 10 04 08 40 25 2.5 -9 681.30 -58.7 -50.5 -57.4 62 -99 SPO 1997 10 04 08 41 25 2.7 -9 681.30 -58.7 -50.2 -57.3 62 -99 SPO 1997 10 04 08 42 27 2.6 -9 681.30 -58.5 -50.2 -57.3 61 -99 SPO 1997 10 04 08 43 26 2.8 -9 681.30 -58.5 -50.2 -57.3 61 -99 SPO 1997 10 04 08 44 29 2.7 -9 681.30 -58.5 -49.7 -57.3 61 -99 SPO 1997 10 04 08 45 35 2.4 -9 681.30 -58.5 -50.2 -57.2 62 -99 SPO 1997 10 04 08 46 36 2.4 -9 681.30 -58.5 -50.4 -57.2 62 -99 SPO 1997 10 04 08 47 44 2.4 -9 681.30 -58.5 -50.5 -57.2 62 -99 SPO 1997 10 04 08 48 47 2.4 -9 681.30 -58.5 -50.7 -57.4 63 -99 SPO 1997 10 04 08 49 43 2.4 -9 681.20 -58.5 -50.7 -57.5 63 -99 SPO 1997 10 04 08 50 31 2.8 -9 681.20 -58.5 -50.5 -57.5 64 -99 SPO 1997 10 04 08 51 30 3.0 -9 681.20 -58.5 -50.5 -57.5 64 -99 SPO 1997 10 04 08 52 29 3.0 -9 681.20 -58.5 -50.4 -57.4 64 -99 SPO 1997 10 04 08 53 31 2.9 -9 681.20 -58.5 -50.2 -57.4 63 -99 SPO 1997 10 04 08 54 34 2.8 -9 681.20 -58.4 -50.5 -57.4 62 -99 SPO 1997 10 04 08 55 30 2.9 -9 681.30 -58.4 -50.5 -57.3 62 -99 SPO 1997 10 04 08 56 34 2.9 -9 681.20 -58.4 -50.7 -57.2 62 -99 SPO 1997 10 04 08 57 30 3.0 -9 681.20 -58.4 -50.7 -57.3 62 -99 SPO 1997 10 04 08 58 28 3.0 -9 681.30 -58.2 -50.7 -57.2 61 -99 SPO 1997 10 04 08 59 39 2.8 -9 681.30 -58.2 -50.7 -57.2 62 -99 SPO 1997 10 04 09 00 35 2.9 -9 681.30 -58.2 -50.7 -57.2 62 0 SPO 1997 10 04 09 01 36 2.8 -9 681.30 -58.2 -50.7 -57.1 63 -99 SPO 1997 10 04 09 02 32 3.0 -9 681.20 -58.2 -50.5 -57.0 64 -99 SPO 1997 10 04 09 03 31 3.2 -9 681.20 -58.0 -50.5 -56.8 63 -99 SPO 1997 10 04 09 04 29 3.5 -9 681.20 -58.0 -50.5 -56.8 65 -99 SPO 1997 10 04 09 05 34 3.2 -9 681.20 -57.9 -50.5 -56.8 65 -99 SPO 1997 10 04 09 06 41 3.2 -9 681.20 -58.0 -50.5 -56.8 66 -99 SPO 1997 10 04 09 07 40 3.1 -9 681.20 -58.2 -50.5 -56.9 66 -99 SPO 1997 10 04 09 08 47 3.0 -9 681.30 -58.2 -50.5 -56.9 65 -99 SPO 1997 10 04 09 09 41 3.1 -9 681.30 -58.2 -50.5 -56.9 65 -99 SPO 1997 10 04 09 10 40 2.9 -9 681.30 -58.0 -50.4 -56.8 63 -99 SPO 1997 10 04 09 11 41 2.9 -9 681.30 -57.9 -50.4 -56.7 62 -99 SPO 1997 10 04 09 12 40 3.0 -9 681.30 -57.9 -50.4 -56.7 64 -99 SPO 1997 10 04 09 13 42 3.1 -9 681.30 -57.7 -50.4 -56.6 64 -99 SPO 1997 10 04 09 14 42 3.2 -9 681.30 -57.7 -50.4 -56.6 65 -99 SPO 1997 10 04 09 15 34 3.3 -9 681.30 -57.7 -50.2 -56.5 66 -99 SPO 1997 10 04 09 16 39 3.4 -9 681.30 -57.7 -50.2 -56.5 67 -99 SPO 1997 10 04 09 17 37 3.4 -9 681.30 -57.7 -50.2 -56.4 67 -99 SPO 1997 10 04 09 18 47 3.3 -9 681.30 -57.7 -50.4 -56.4 67 -99 SPO 1997 10 04 09 19 50 3.4 -9 681.30 -57.7 -50.4 -56.5 66 -99 SPO 1997 10 04 09 20 50 3.5 -9 681.30 -57.7 -50.5 -56.4 66 -99 SPO 1997 10 04 09 21 47 3.6 -9 681.30 -57.5 -50.5 -56.4 64 -99 SPO 1997 10 04 09 22 46 3.8 -9 681.30 -57.5 -50.5 -56.3 64 -99 SPO 1997 10 04 09 23 43 3.9 -9 681.30 -57.5 -50.5 -56.3 65 -99 SPO 1997 10 04 09 24 46 3.9 -9 681.30 -57.4 -50.5 -56.2 65 -99 SPO 1997 10 04 09 25 45 4.1 -9 681.30 -57.4 -50.4 -56.1 66 -99 SPO 1997 10 04 09 26 50 4.0 -9 681.30 -57.2 -50.2 -56.0 65 -99 SPO 1997 10 04 09 27 47 4.0 -9 681.30 -57.2 -50.2 -56.0 65 -99 SPO 1997 10 04 09 28 46 4.1 -9 681.30 -57.2 -50.2 -55.9 67 -99 SPO 1997 10 04 09 29 46 4.3 -9 681.30 -57.0 -50.2 -55.9 66 -99 SPO 1997 10 04 09 30 44 4.4 -9 681.40 -57.0 -50.2 -55.8 67 -99 SPO 1997 10 04 09 31 43 4.5 -9 681.40 -57.0 -50.2 -55.8 68 -99 SPO 1997 10 04 09 32 41 4.5 -9 681.40 -56.9 -50.0 -55.7 67 -99 SPO 1997 10 04 09 33 42 4.3 -9 681.40 -56.9 -50.0 -55.7 67 -99 SPO 1997 10 04 09 34 44 4.2 -9 681.40 -56.9 -50.0 -55.7 67 -99 SPO 1997 10 04 09 35 44 4.2 -9 681.40 -56.9 -50.0 -55.7 68 -99 SPO 1997 10 04 09 36 39 4.3 -9 681.40 -56.9 -49.9 -55.7 68 -99 SPO 1997 10 04 09 37 39 4.3 -9 681.40 -56.7 -49.7 -55.6 66 -99 SPO 1997 10 04 09 38 40 4.5 -9 681.40 -56.7 -49.7 -55.6 68 -99 SPO 1997 10 04 09 39 40 4.7 -9 681.40 -56.7 -49.7 -55.6 68 -99 SPO 1997 10 04 09 40 43 4.6 -9 681.40 -56.7 -49.7 -55.6 68 -99 SPO 1997 10 04 09 41 43 4.5 -9 681.40 -56.7 -49.7 -55.6 68 -99 SPO 1997 10 04 09 42 43 4.6 -9 681.40 -56.7 -49.9 -55.6 68 -99 SPO 1997 10 04 09 43 42 4.5 -9 681.40 -56.7 -49.7 -55.6 67 -99 SPO 1997 10 04 09 44 38 4.5 -9 681.40 -56.5 -49.7 -55.5 64 -99 SPO 1997 10 04 09 45 39 4.4 -9 681.40 -56.5 -49.7 -55.4 64 -99 SPO 1997 10 04 09 46 39 4.3 -9 681.40 -56.5 -49.5 -55.4 64 -99 SPO 1997 10 04 09 47 38 4.3 -9 681.40 -56.4 -49.5 -55.3 64 -99 SPO 1997 10 04 09 48 39 4.4 -9 681.40 -56.4 -49.5 -55.2 65 -99 SPO 1997 10 04 09 49 41 4.5 -9 681.40 -56.4 -49.7 -55.2 66 -99 SPO 1997 10 04 09 50 40 4.6 -9 681.30 -56.2 -49.7 -55.2 65 -99 SPO 1997 10 04 09 51 38 4.8 -9 681.30 -56.2 -49.5 -55.2 66 -99 SPO 1997 10 04 09 52 36 4.8 -9 681.30 -56.0 -49.5 -55.1 65 -99 SPO 1997 10 04 09 53 37 4.9 -9 681.30 -56.0 -49.5 -55.0 65 -99 SPO 1997 10 04 09 54 36 5.0 -9 681.30 -56.0 -49.4 -55.0 66 -99 SPO 1997 10 04 09 55 37 4.9 -9 681.30 -56.0 -49.4 -54.9 65 -99 SPO 1997 10 04 09 56 36 4.9 -9 681.30 -55.9 -49.4 -54.9 65 -99 SPO 1997 10 04 09 57 36 4.9 -9 681.30 -55.7 -49.2 -54.8 64 -99 SPO 1997 10 04 09 58 34 4.9 -9 681.30 -55.7 -49.2 -54.7 64 -99 SPO 1997 10 04 09 59 39 4.8 -9 681.30 -55.7 -49.2 -54.7 65 -99 SPO 1997 10 04 10 00 39 4.8 -9 681.30 -55.7 -49.2 -54.6 65 0 SPO 1997 10 04 10 01 40 4.8 -9 681.30 -55.5 -49.4 -54.6 65 -99 SPO 1997 10 04 10 02 37 4.7 -9 681.30 -55.5 -49.2 -54.6 66 -99 SPO 1997 10 04 10 03 34 4.7 -9 681.20 -55.5 -49.2 -54.5 66 -99 SPO 1997 10 04 10 04 35 4.8 -9 681.20 -55.5 -49.2 -54.5 67 -99 SPO 1997 10 04 10 05 32 4.9 -9 681.20 -55.5 -49.2 -54.5 67 -99 SPO 1997 10 04 10 06 32 4.8 -9 681.20 -55.5 -49.2 -54.4 67 -99 SPO 1997 10 04 10 07 34 4.8 -9 681.20 -55.5 -49.2 -54.4 67 -99 SPO 1997 10 04 10 08 34 4.8 -9 681.20 -55.5 -49.0 -54.4 67 -99 SPO 1997 10 04 10 09 32 4.8 -9 681.20 -55.5 -49.0 -54.4 67 -99 SPO 1997 10 04 10 10 33 4.5 -9 681.20 -55.4 -49.0 -54.3 67 -99 SPO 1997 10 04 10 11 33 4.2 -9 681.20 -55.2 -49.0 -54.2 66 -99 SPO 1997 10 04 10 12 34 4.1 -9 681.20 -55.4 -49.0 -54.2 68 -99 SPO 1997 10 04 10 13 36 4.1 -9 681.20 -55.4 -48.9 -54.3 69 -99 SPO 1997 10 04 10 14 38 4.1 -9 681.20 -55.4 -48.9 -54.3 69 -99 SPO 1997 10 04 10 15 38 4.0 -9 681.20 -55.5 -48.9 -54.4 69 -99 SPO 1997 10 04 10 16 38 4.0 -9 681.20 -55.5 -48.9 -54.4 68 -99 SPO 1997 10 04 10 17 37 4.2 -9 681.20 -55.5 -48.9 -54.4 68 -99 SPO 1997 10 04 10 18 36 4.1 -9 681.20 -55.5 -48.7 -54.4 68 -99 SPO 1997 10 04 10 19 35 4.1 -9 681.20 -55.5 -48.7 -54.4 67 -99 SPO 1997 10 04 10 20 33 4.2 -9 681.20 -55.7 -48.7 -54.3 68 -99 SPO 1997 10 04 10 21 35 4.0 -9 681.20 -55.7 -48.7 -54.3 67 -99 SPO 1997 10 04 10 22 37 3.7 -9 681.30 -55.7 -48.7 -54.2 67 -99 SPO 1997 10 04 10 23 39 3.3 -9 681.30 -55.7 -48.7 -54.2 67 -99 SPO 1997 10 04 10 24 41 3.1 -9 681.30 -55.9 -48.9 -54.2 69 -99 SPO 1997 10 04 10 25 38 3.4 -9 681.20 -55.7 -48.9 -54.3 67 -99 SPO 1997 10 04 10 26 35 3.4 -9 681.20 -56.0 -48.9 -54.2 69 -99 SPO 1997 10 04 10 27 35 3.3 -9 681.30 -56.0 -48.9 -54.2 69 -99 SPO 1997 10 04 10 28 34 3.3 -9 681.30 -56.0 -48.9 -54.2 69 -99 SPO 1997 10 04 10 29 33 3.5 -9 681.30 -56.0 -48.9 -54.2 69 -99 SPO 1997 10 04 10 30 36 3.4 -9 681.30 -56.0 -48.7 -54.4 69 -99 SPO 1997 10 04 10 31 37 3.0 -9 681.30 -56.2 -48.7 -54.5 70 -99 SPO 1997 10 04 10 32 39 2.7 -9 681.40 -56.2 -48.7 -54.4 69 -99 SPO 1997 10 04 10 33 43 2.6 -9 681.40 -56.4 -48.7 -54.2 69 -99 SPO 1997 10 04 10 34 46 2.6 -9 681.40 -56.5 -48.7 -54.2 69 -99 SPO 1997 10 04 10 35 43 2.7 -9 681.40 -56.7 -48.7 -54.2 69 -99 SPO 1997 10 04 10 36 42 2.7 -9 681.40 -56.7 -48.9 -54.3 68 -99 SPO 1997 10 04 10 37 48 2.6 -9 681.40 -56.7 -49.2 -54.4 67 -99 SPO 1997 10 04 10 38 51 2.4 -9 681.40 -56.9 -49.5 -54.6 68 -99 SPO 1997 10 04 10 39 53 2.3 -9 681.40 -57.0 -49.4 -54.7 68 -99 SPO 1997 10 04 10 40 55 2.5 -9 681.40 -57.2 -49.7 -54.9 68 -99 SPO 1997 10 04 10 41 54 2.3 -9 681.40 -57.4 -51.2 -55.1 68 -99 SPO 1997 10 04 10 42 48 2.3 -9 681.40 -57.4 -50.2 -55.2 67 -99 SPO 1997 10 04 10 43 48 2.2 -9 681.40 -57.5 -51.0 -55.2 67 -99 SPO 1997 10 04 10 44 54 2.6 -9 681.40 -57.5 -999.9 -55.5 67 -99 SPO 1997 10 04 10 45 56 2.8 -9 681.40 -57.4 -999.9 -55.8 66 -99 SPO 1997 10 04 10 46 52 2.8 -9 681.40 -57.4 -999.9 -55.8 65 -99 SPO 1997 10 04 10 47 51 3.0 -9 681.40 -57.2 -51.2 -55.9 63 -99 SPO 1997 10 04 10 48 58 3.1 -9 681.40 -57.2 -50.5 -55.9 63 -99 SPO 1997 10 04 10 49 56 3.3 -9 681.40 -57.2 -50.5 -56.0 63 -99 SPO 1997 10 04 10 50 52 3.4 -9 681.40 -57.2 -50.5 -56.1 63 -99 SPO 1997 10 04 10 51 52 3.3 -9 681.40 -57.2 -50.0 -56.1 64 -99 SPO 1997 10 04 10 52 56 3.2 -9 681.40 -57.2 -50.2 -56.2 64 -99 SPO 1997 10 04 10 53 56 3.2 -9 681.40 -57.2 -50.2 -56.2 65 -99 SPO 1997 10 04 10 54 62 3.0 -9 681.40 -57.4 -50.5 -56.2 67 -99 SPO 1997 10 04 10 55 66 2.9 -9 681.50 -57.4 -50.7 -56.1 66 -99 SPO 1997 10 04 10 56 69 3.0 -9 681.50 -57.5 -51.0 -56.1 67 -99 SPO 1997 10 04 10 57 68 3.1 -9 681.50 -57.5 -51.0 -56.1 66 -99 SPO 1997 10 04 10 58 69 3.2 -9 681.50 -57.5 -51.0 -56.2 65 -99 SPO 1997 10 04 10 59 69 3.4 -9 681.50 -57.7 -51.0 -56.3 66 -99 SPO 1997 10 04 11 00 70 3.4 -9 681.50 -57.7 -50.9 -56.4 64 0 SPO 1997 10 04 11 01 68 3.5 -9 681.50 -57.7 -50.5 -56.4 64 -99 SPO 1997 10 04 11 02 67 3.7 -9 681.40 -57.9 -50.5 -56.6 64 -99 SPO 1997 10 04 11 03 67 3.6 -9 681.40 -57.9 -50.4 -56.6 64 -99 SPO 1997 10 04 11 04 67 3.7 -9 681.50 -58.0 -50.4 -56.7 65 -99 SPO 1997 10 04 11 05 66 3.7 -9 681.50 -58.0 -50.2 -56.7 66 -99 SPO 1997 10 04 11 06 68 3.8 -9 681.40 -57.9 -50.2 -56.8 64 -99 SPO 1997 10 04 11 07 69 3.9 -9 681.40 -57.9 -50.4 -56.8 64 -99 SPO 1997 10 04 11 08 70 3.8 -9 681.40 -58.0 -50.5 -56.9 63 -99 SPO 1997 10 04 11 09 70 3.9 -9 681.40 -58.0 -50.5 -56.9 63 -99 SPO 1997 10 04 11 10 70 4.1 -9 681.40 -58.0 -50.5 -57.0 63 -99 SPO 1997 10 04 11 11 72 4.1 -9 681.40 -58.0 -50.5 -57.0 62 -99 SPO 1997 10 04 11 12 71 4.0 -9 681.40 -58.0 -50.7 -57.0 62 -99 SPO 1997 10 04 11 13 67 4.2 -9 681.40 -58.0 -50.9 -57.1 62 -99 SPO 1997 10 04 11 14 68 4.3 -9 681.40 -58.0 -50.5 -57.2 62 -99 SPO 1997 10 04 11 15 69 4.3 -9 681.40 -58.0 -50.4 -57.2 62 -99 SPO 1997 10 04 11 16 71 4.3 -9 681.40 -58.0 -50.5 -57.2 62 -99 SPO 1997 10 04 11 17 70 4.2 -9 681.40 -58.0 -50.5 -57.2 63 -99 SPO 1997 10 04 11 18 70 4.3 -9 681.40 -58.0 -50.5 -57.2 63 -99 SPO 1997 10 04 11 19 71 4.2 -9 681.40 -58.0 -50.7 -57.3 63 -99 SPO 1997 10 04 11 20 72 4.2 -9 681.40 -58.0 -50.7 -57.3 62 -99 SPO 1997 10 04 11 21 70 4.1 -9 681.40 -58.2 -50.5 -57.3 64 -99 SPO 1997 10 04 11 22 69 4.0 -9 681.40 -58.2 -50.4 -57.4 63 -99 SPO 1997 10 04 11 23 68 4.1 -9 681.40 -58.2 -50.2 -57.4 62 -99 SPO 1997 10 04 11 24 69 4.1 -9 681.40 -58.2 -50.4 -57.5 62 -99 SPO 1997 10 04 11 25 71 4.2 -9 681.40 -58.2 -50.2 -57.5 62 -99 SPO 1997 10 04 11 26 71 4.3 -9 681.40 -58.2 -50.7 -57.6 62 -99 SPO 1997 10 04 11 27 71 4.2 -9 681.40 -58.2 -51.0 -57.6 62 -99 SPO 1997 10 04 11 28 70 4.3 -9 681.40 -58.2 -51.0 -57.7 62 -99 SPO 1997 10 04 11 29 68 4.2 -9 681.30 -58.2 -50.7 -57.7 62 -99 SPO 1997 10 04 11 30 69 4.2 -9 681.40 -58.2 -50.7 -57.7 62 -99 SPO 1997 10 04 11 31 69 4.1 -9 681.40 -58.2 -51.0 -57.6 62 -99 SPO 1997 10 04 11 32 68 4.2 -9 681.40 -58.0 -51.0 -57.6 61 -99 SPO 1997 10 04 11 33 68 4.1 -9 681.40 -58.0 -51.0 -57.6 61 -99 SPO 1997 10 04 11 34 67 4.2 -9 681.40 -58.0 -50.7 -57.6 61 -99 SPO 1997 10 04 11 35 68 4.3 -9 681.40 -58.0 -51.0 -57.5 61 -99 SPO 1997 10 04 11 36 67 4.4 -9 681.30 -58.2 -50.7 -57.6 62 -99 SPO 1997 10 04 11 37 67 4.5 -9 681.30 -58.2 -50.7 -57.6 62 -99 SPO 1997 10 04 11 38 67 4.4 -9 681.30 -58.2 -50.5 -57.5 62 -99 SPO 1997 10 04 11 39 66 4.5 -9 681.30 -58.0 -50.5 -57.5 61 -99 SPO 1997 10 04 11 40 68 4.4 -9 681.30 -58.0 -50.5 -57.4 61 -99 SPO 1997 10 04 11 41 69 4.4 -9 681.40 -58.0 -50.5 -57.4 62 -99 SPO 1997 10 04 11 42 70 4.3 -9 681.40 -58.0 -50.7 -57.3 62 -99 SPO 1997 10 04 11 43 69 4.4 -9 681.40 -58.0 -50.7 -57.3 63 -99 SPO 1997 10 04 11 44 67 4.3 -9 681.30 -58.0 -50.5 -57.3 63 -99 SPO 1997 10 04 11 45 65 4.5 -9 681.30 -57.9 -50.0 -57.3 64 -99 SPO 1997 10 04 11 46 65 4.6 -9 681.30 -57.9 -50.0 -57.3 65 -99 SPO 1997 10 04 11 47 66 4.7 -9 681.30 -57.9 -49.9 -57.3 65 -99 SPO 1997 10 04 11 48 65 4.7 -9 681.30 -57.7 -50.0 -57.3 63 -99 SPO 1997 10 04 11 49 64 4.8 -9 681.30 -57.7 -50.0 -57.3 63 -99 SPO 1997 10 04 11 50 64 4.7 -9 681.30 -57.7 -49.9 -57.2 63 -99 SPO 1997 10 04 11 51 63 4.7 -9 681.30 -57.5 -49.7 -57.1 62 -99 SPO 1997 10 04 11 52 63 5.0 -9 681.30 -57.5 -49.9 -57.1 63 -99 SPO 1997 10 04 11 53 61 5.1 -9 681.30 -57.5 -49.5 -57.0 63 -99 SPO 1997 10 04 11 54 59 5.2 -9 681.30 -57.5 -49.7 -57.0 63 -99 SPO 1997 10 04 11 55 58 5.1 -9 681.30 -57.5 -49.5 -56.9 63 -99 SPO 1997 10 04 11 56 57 5.2 -9 681.20 -57.5 -49.5 -56.8 64 -99 SPO 1997 10 04 11 57 56 5.2 -9 681.20 -57.4 -49.5 -56.8 64 -99 SPO 1997 10 04 11 58 57 5.3 -9 681.30 -57.4 -49.5 -56.7 65 -99 SPO 1997 10 04 11 59 57 5.3 -9 681.30 -57.4 -49.5 -56.7 65 -99 SPO 1997 10 04 12 00 56 5.3 -9 681.30 -57.2 -49.5 -56.6 63 0 SPO 1997 10 04 12 01 55 5.3 -9 681.30 -57.2 -49.5 -56.6 64 -99 SPO 1997 10 04 12 02 56 5.4 -9 681.30 -57.2 -49.5 -56.6 64 -99 SPO 1997 10 04 12 03 57 5.2 -9 681.30 -57.2 -49.4 -56.6 64 -99 SPO 1997 10 04 12 04 56 5.1 -9 681.30 -57.2 -49.4 -56.7 65 -99 SPO 1997 10 04 12 05 57 5.0 -9 681.30 -57.2 -49.2 -56.6 65 -99 SPO 1997 10 04 12 06 59 4.9 -9 681.40 -57.2 -49.5 -56.7 66 -99 SPO 1997 10 04 12 07 60 4.7 -9 681.40 -57.2 -49.5 -56.7 66 -99 SPO 1997 10 04 12 08 58 4.7 -9 681.40 -57.4 -49.5 -56.7 68 -99 SPO 1997 10 04 12 09 59 4.7 -9 681.30 -57.4 -49.5 -56.7 67 -99 SPO 1997 10 04 12 10 59 4.7 -9 681.30 -57.4 -49.5 -56.7 67 -99 SPO 1997 10 04 12 11 59 4.6 -9 681.40 -57.4 -49.4 -56.8 67 -99 SPO 1997 10 04 12 12 58 4.5 -9 681.40 -57.5 -49.4 -56.8 67 -99 SPO 1997 10 04 12 13 56 4.3 -9 681.40 -57.5 -49.4 -56.8 66 -99 SPO 1997 10 04 12 14 53 4.5 -9 681.30 -57.5 -49.4 -56.8 66 -99 SPO 1997 10 04 12 15 54 4.5 -9 681.30 -57.5 -49.4 -56.8 66 -99 SPO 1997 10 04 12 16 54 4.7 -9 681.30 -57.5 -49.4 -56.7 66 -99 SPO 1997 10 04 12 17 57 4.6 -9 681.30 -57.4 -49.5 -56.7 65 -99 SPO 1997 10 04 12 18 56 4.8 -9 681.30 -57.4 -49.7 -56.8 66 -99 SPO 1997 10 04 12 19 55 4.8 -9 681.30 -57.5 -49.5 -56.8 67 -99 SPO 1997 10 04 12 20 55 5.0 -9 681.30 -57.4 -50.0 -56.8 66 -99 SPO 1997 10 04 12 21 57 4.9 -9 681.30 -57.4 -50.0 -56.8 67 -99 SPO 1997 10 04 12 22 59 4.9 -9 681.30 -57.4 -50.4 -56.8 67 -99 SPO 1997 10 04 12 23 60 4.9 -9 681.30 -57.4 -50.5 -56.8 67 -99 SPO 1997 10 04 12 24 62 4.9 -9 681.30 -57.4 -50.7 -56.9 66 -99 SPO 1997 10 04 12 25 61 4.8 -9 681.30 -57.4 -51.2 -56.9 66 -99 SPO 1997 10 04 12 26 61 4.6 -9 681.30 -57.4 -51.4 -56.9 65 -99 SPO 1997 10 04 12 27 60 4.5 -9 681.20 -57.4 -51.4 -56.9 65 -99 SPO 1997 10 04 12 28 60 4.4 -9 681.20 -57.4 -51.2 -56.8 65 -99 SPO 1997 10 04 12 29 60 4.2 -9 681.30 -57.4 -51.4 -56.8 65 -99 SPO 1997 10 04 12 30 62 4.2 -9 681.30 -57.4 -52.0 -56.9 65 -99 SPO 1997 10 04 12 31 63 4.2 -9 681.30 -57.5 -52.5 -56.9 66 -99 SPO 1997 10 04 12 32 62 4.2 -9 681.30 -57.5 -52.5 -56.9 66 -99 SPO 1997 10 04 12 33 62 4.4 -9 681.30 -57.5 -52.2 -57.0 66 -99 SPO 1997 10 04 12 34 62 4.5 -9 681.30 -57.5 -52.0 -57.0 66 -99 SPO 1997 10 04 12 35 62 4.5 -9 681.30 -57.5 -51.9 -57.1 66 -99 SPO 1997 10 04 12 36 62 4.5 -9 681.30 -57.5 -51.5 -57.1 65 -99 SPO 1997 10 04 12 37 61 4.4 -9 681.20 -57.5 -51.2 -57.2 64 -99 SPO 1997 10 04 12 38 60 4.5 -9 681.20 -57.5 -50.9 -57.2 64 -99 SPO 1997 10 04 12 39 61 4.7 -9 681.20 -57.5 -50.7 -57.2 64 -99 SPO 1997 10 04 12 40 61 4.8 -9 681.20 -57.5 -50.5 -57.2 64 -99 SPO 1997 10 04 12 41 58 4.7 -9 681.20 -57.5 -50.4 -57.2 65 -99 SPO 1997 10 04 12 42 57 4.8 -9 681.20 -57.5 -50.0 -57.2 64 -99 SPO 1997 10 04 12 43 58 4.8 -9 681.20 -57.5 -49.7 -57.2 64 -99 SPO 1997 10 04 12 44 60 4.8 -9 681.20 -57.5 -50.2 -57.1 64 -99 SPO 1997 10 04 12 45 60 4.9 -9 681.20 -57.5 -50.5 -57.2 65 -99 SPO 1997 10 04 12 46 61 5.0 -9 681.20 -57.5 -50.4 -57.2 65 -99 SPO 1997 10 04 12 47 62 5.0 -9 681.20 -57.5 -50.4 -57.2 65 -99 SPO 1997 10 04 12 48 63 5.0 -9 681.20 -57.5 -50.5 -57.2 64 -99 SPO 1997 10 04 12 49 64 4.8 -9 681.20 -57.5 -51.0 -57.2 64 -99 SPO 1997 10 04 12 50 64 4.6 -9 681.20 -57.5 -51.2 -57.2 64 -99 SPO 1997 10 04 12 51 63 4.5 -9 681.20 -57.5 -51.4 -57.2 64 -99 SPO 1997 10 04 12 52 61 4.6 -9 681.20 -57.5 -51.2 -57.2 64 -99 SPO 1997 10 04 12 53 61 4.7 -9 681.20 -57.5 -51.2 -57.2 64 -99 SPO 1997 10 04 12 54 61 4.6 -9 681.20 -57.5 -50.7 -57.2 65 -99 SPO 1997 10 04 12 55 60 4.7 -9 681.20 -57.5 -50.7 -57.3 65 -99 SPO 1997 10 04 12 56 61 4.8 -9 681.20 -57.5 -50.7 -57.3 64 -99 SPO 1997 10 04 12 57 62 4.8 -9 681.20 -57.5 -50.9 -57.3 65 -99 SPO 1997 10 04 12 58 62 4.8 -9 681.20 -57.5 -50.9 -57.3 65 -99 SPO 1997 10 04 12 59 62 4.7 -9 681.20 -57.7 -50.9 -57.3 66 -99 SPO 1997 10 04 13 00 63 4.8 -9 681.20 -57.7 -51.0 -57.3 64 0 SPO 1997 10 04 13 01 62 4.9 -9 681.20 -57.7 -51.2 -57.4 64 -99 SPO 1997 10 04 13 02 62 5.0 -9 681.20 -57.7 -51.2 -57.4 64 -99 SPO 1997 10 04 13 03 62 5.0 -9 681.20 -57.7 -51.4 -57.4 63 -99 SPO 1997 10 04 13 04 64 4.9 -9 681.20 -57.7 -51.7 -57.4 63 -99 SPO 1997 10 04 13 05 65 4.8 -9 681.30 -57.7 -51.9 -57.4 64 -99 SPO 1997 10 04 13 06 65 4.9 -9 681.20 -57.7 -52.0 -57.4 64 -99 SPO 1997 10 04 13 07 65 5.0 -9 681.20 -57.7 -51.9 -57.4 65 -99 SPO 1997 10 04 13 08 64 5.0 -9 681.20 -57.7 -52.0 -57.4 65 -99 SPO 1997 10 04 13 09 62 5.0 -9 681.20 -57.7 -51.5 -57.5 65 -99 SPO 1997 10 04 13 10 61 5.0 -9 681.20 -57.7 -51.5 -57.5 65 -99 SPO 1997 10 04 13 11 63 5.0 -9 681.20 -57.7 -51.5 -57.5 64 -99 SPO 1997 10 04 13 12 66 4.8 -9 681.20 -57.7 -51.5 -57.5 64 -99 SPO 1997 10 04 13 13 66 4.8 -9 681.20 -57.7 -51.5 -57.5 63 -99 SPO 1997 10 04 13 14 68 4.6 -9 681.20 -57.7 -51.5 -57.4 63 -99 SPO 1997 10 04 13 15 68 4.7 -9 681.20 -57.9 -51.4 -57.4 62 -99 SPO 1997 10 04 13 16 67 4.8 -9 681.20 -57.9 -51.0 -57.4 62 -99 SPO 1997 10 04 13 17 65 5.0 -9 681.20 -58.0 -50.7 -57.6 62 -99 SPO 1997 10 04 13 18 65 5.2 -9 681.20 -58.0 -50.5 -57.6 63 -99 SPO 1997 10 04 13 19 64 5.1 -9 681.10 -58.0 -50.5 -57.7 63 -99 SPO 1997 10 04 13 20 62 5.2 -9 681.10 -58.0 -50.4 -57.7 62 -99 SPO 1997 10 04 13 21 61 5.4 -9 681.10 -58.0 -50.2 -57.7 62 -99 SPO 1997 10 04 13 22 62 5.4 -9 681.20 -58.0 -50.0 -57.7 62 -99 SPO 1997 10 04 13 23 62 5.5 -9 681.10 -58.0 -50.0 -57.7 61 -99 SPO 1997 10 04 13 24 63 5.4 -9 681.10 -58.0 -50.0 -57.7 61 -99 SPO 1997 10 04 13 25 66 5.2 -9 681.10 -58.0 -50.4 -57.7 59 -99 SPO 1997 10 04 13 26 68 5.0 -9 681.20 -58.0 -50.7 -57.7 59 -99 SPO 1997 10 04 13 27 68 4.9 -9 681.20 -58.0 -51.0 -57.7 59 -99 SPO 1997 10 04 13 28 67 4.9 -9 681.10 -58.0 -51.0 -57.6 59 -99 SPO 1997 10 04 13 29 69 4.9 -9 681.10 -58.0 -50.9 -57.6 59 -99 SPO 1997 10 04 13 30 69 4.9 -9 681.10 -58.0 -50.9 -57.6 61 -99 SPO 1997 10 04 13 31 70 4.8 -9 681.10 -58.0 -51.0 -57.5 62 -99 SPO 1997 10 04 13 32 68 4.8 -9 681.10 -58.0 -51.0 -57.5 62 -99 SPO 1997 10 04 13 33 69 4.7 -9 681.10 -58.0 -51.2 -57.5 62 -99 SPO 1997 10 04 13 34 69 4.7 -9 681.10 -58.0 -51.2 -57.5 62 -99 SPO 1997 10 04 13 35 69 4.6 -9 681.20 -58.0 -51.2 -57.4 62 -99 SPO 1997 10 04 13 36 70 4.5 -9 681.20 -57.9 -51.2 -57.3 62 -99 SPO 1997 10 04 13 37 69 4.5 -9 681.20 -57.9 -51.2 -57.3 62 -99 SPO 1997 10 04 13 38 71 4.6 -9 681.20 -57.9 -51.2 -57.3 62 -99 SPO 1997 10 04 13 39 71 4.6 -9 681.20 -57.9 -51.0 -57.2 62 -99 SPO 1997 10 04 13 40 74 4.6 -9 681.20 -57.9 -51.2 -57.2 62 -99 SPO 1997 10 04 13 41 74 4.5 -9 681.20 -57.9 -51.5 -57.1 64 -99 SPO 1997 10 04 13 42 75 4.4 -9 681.20 -57.9 -51.7 -57.1 65 -99 SPO 1997 10 04 13 43 74 4.3 -9 681.20 -57.9 -52.0 -57.1 65 -99 SPO 1997 10 04 13 44 75 4.2 -9 681.20 -57.9 -52.2 -57.0 65 -99 SPO 1997 10 04 13 45 74 4.2 -9 681.20 -57.9 -52.5 -57.0 65 -99 SPO 1997 10 04 13 46 74 4.1 -9 681.20 -57.9 -52.5 -57.0 65 -99 SPO 1997 10 04 13 47 73 4.2 -9 681.20 -57.9 -52.4 -56.9 65 -99 SPO 1997 10 04 13 48 72 4.0 -9 681.20 -57.9 -52.7 -57.0 65 -99 SPO 1997 10 04 13 49 67 2.9 -9 681.20 -58.0 -53.5 -56.9 65 -99 SPO 1997 10 04 13 50 42 1.4 -9 681.30 -58.0 -54.9 -56.6 65 -99 SPO 1997 10 04 13 51 59 2.2 -9 681.30 -58.0 -55.4 -56.5 63 -99 SPO 1997 10 04 13 52 70 3.7 -9 681.30 -57.9 -54.7 -56.6 64 -99 SPO 1997 10 04 13 53 67 3.1 -9 681.20 -57.9 -54.4 -56.8 65 -99 SPO 1997 10 04 13 54 41 1.4 -9 681.30 -58.0 -55.2 -56.6 66 -99 SPO 1997 10 04 13 55 20 1.0 -9 681.30 -57.9 -56.2 -56.3 65 -99 SPO 1997 10 04 13 56 37 1.3 -9 681.30 -57.7 -56.2 -56.2 63 -99 SPO 1997 10 04 13 57 62 2.3 -9 681.30 -57.7 -55.7 -56.2 63 -99 SPO 1997 10 04 13 58 64 2.8 -9 681.30 -57.5 -55.2 -56.3 63 -99 SPO 1997 10 04 13 59 65 2.4 -9 681.30 -57.5 -55.2 -56.4 63 -99 SPO 1997 10 04 14 00 56 1.8 -9 681.30 -57.5 -55.4 -56.2 63 0 SPO 1997 10 04 14 01 40 1.2 -9 681.40 -57.7 -55.7 -56.0 66 -99 SPO 1997 10 04 14 02 40 1.2 -9 681.40 -57.7 -56.2 -55.8 66 -99 SPO 1997 10 04 14 03 45 1.4 -9 681.40 -57.5 -56.4 -55.9 63 -99 SPO 1997 10 04 14 04 53 1.9 -9 681.30 -57.5 -56.0 -55.9 64 -99 SPO 1997 10 04 14 05 54 2.0 -9 681.30 -57.4 -55.7 -56.0 63 -99 SPO 1997 10 04 14 06 59 2.4 -9 681.30 -57.4 -55.5 -56.1 63 -99 SPO 1997 10 04 14 07 59 2.2 -9 681.30 -57.4 -55.5 -56.2 63 -99 SPO 1997 10 04 14 08 63 2.3 -9 681.30 -57.4 -55.5 -56.2 64 -99 SPO 1997 10 04 14 09 60 2.0 -9 681.30 -57.4 -55.5 -56.2 64 -99 SPO 1997 10 04 14 10 58 1.8 -9 681.30 -57.4 -55.7 -56.0 64 -99 SPO 1997 10 04 14 11 46 1.1 -9 681.30 -57.5 -56.0 -55.9 65 -99 SPO 1997 10 04 14 12 42 1.2 -9 681.40 -57.5 -56.2 -55.8 66 -99 SPO 1997 10 04 14 13 51 1.4 -9 681.40 -57.4 -56.0 -55.8 65 -99 SPO 1997 10 04 14 14 55 1.7 -9 681.30 -57.4 -56.0 -55.9 65 -99 SPO 1997 10 04 14 15 62 2.0 -9 681.30 -57.4 -56.2 -56.0 64 -99 SPO 1997 10 04 14 16 63 1.7 -9 681.40 -57.4 -55.9 -56.1 64 -99 SPO 1997 10 04 14 17 55 1.2 -9 681.40 -57.4 -56.0 -55.9 64 -99 SPO 1997 10 04 14 18 49 0.9 -9 681.40 -57.5 -56.4 -55.6 64 -99 SPO 1997 10 04 14 19 48 0.8 -9 681.40 -57.7 -56.5 -55.2 66 -99 SPO 1997 10 04 14 20 49 1.0 -9 681.40 -57.7 -56.5 -55.0 67 -99 SPO 1997 10 04 14 21 59 1.2 -9 681.40 -57.5 -56.4 -54.9 66 -99 SPO 1997 10 04 14 22 53 1.4 -9 681.40 -57.5 -56.2 -55.1 66 -99 SPO 1997 10 04 14 23 49 1.5 -9 681.30 -57.4 -56.2 -55.4 65 -99 SPO 1997 10 04 14 24 51 1.8 -9 681.30 -57.4 -56.0 -55.6 64 -99 SPO 1997 10 04 14 25 42 1.6 -9 681.30 -57.2 -56.0 -55.6 63 -99 SPO 1997 10 04 14 26 45 1.8 -9 681.30 -57.2 -56.0 -55.6 63 -99 SPO 1997 10 04 14 27 45 1.9 -9 681.30 -57.2 -55.7 -55.6 63 -99 SPO 1997 10 04 14 28 54 2.1 -9 681.30 -57.0 -55.7 -55.7 63 -99 SPO 1997 10 04 14 29 58 2.3 -9 681.30 -57.0 -55.2 -55.7 63 -99 SPO 1997 10 04 14 30 57 2.3 -9 681.30 -57.0 -55.0 -55.7 63 -99 SPO 1997 10 04 14 31 54 2.2 -9 681.30 -57.0 -55.0 -55.7 63 -99 SPO 1997 10 04 14 32 52 2.3 -9 681.30 -57.0 -55.2 -55.7 63 -99 SPO 1997 10 04 14 33 52 2.4 -9 681.30 -57.0 -55.2 -55.8 63 -99 SPO 1997 10 04 14 34 52 2.5 -9 681.30 -57.2 -55.2 -55.8 65 -99 SPO 1997 10 04 14 35 53 2.6 -9 681.20 -57.2 -55.0 -55.9 65 -99 SPO 1997 10 04 14 36 56 2.7 -9 681.30 -57.2 -54.9 -56.0 63 -99 SPO 1997 10 04 14 37 57 2.6 -9 681.30 -57.2 -54.7 -56.0 63 -99 SPO 1997 10 04 14 38 59 2.5 -9 681.20 -57.4 -54.9 -56.1 65 -99 SPO 1997 10 04 14 39 63 2.8 -9 681.20 -57.5 -54.5 -56.2 64 -99 SPO 1997 10 04 14 40 65 2.8 -9 681.30 -57.5 -54.4 -56.2 64 -99 SPO 1997 10 04 14 41 66 2.7 -9 681.30 -57.5 -54.5 -56.2 63 -99 SPO 1997 10 04 14 42 66 2.8 -9 681.30 -57.7 -54.5 -56.4 63 -99 SPO 1997 10 04 14 43 69 2.9 -9 681.30 -57.7 -54.0 -56.3 61 -99 SPO 1997 10 04 14 44 68 2.8 -9 681.30 -57.7 -54.5 -56.4 61 -99 SPO 1997 10 04 14 45 65 3.1 -9 681.30 -57.7 -54.5 -56.4 60 -99 SPO 1997 10 04 14 46 66 3.3 -9 681.30 -57.7 -54.5 -56.5 60 -99 SPO 1997 10 04 14 47 65 3.5 -9 681.30 -57.9 -54.4 -56.6 62 -99 SPO 1997 10 04 14 48 64 3.7 -9 681.30 -57.9 -54.2 -56.7 62 -99 SPO 1997 10 04 14 49 63 3.7 -9 681.20 -57.9 -54.0 -56.8 62 -99 SPO 1997 10 04 14 50 65 3.6 -9 681.20 -58.0 -53.7 -56.8 62 -99 SPO 1997 10 04 14 51 64 3.5 -9 681.30 -58.0 -53.7 -56.8 62 -99 SPO 1997 10 04 14 52 65 3.4 -9 681.20 -58.0 -53.5 -56.8 62 -99 SPO 1997 10 04 14 53 65 3.4 -9 681.30 -58.0 -53.7 -56.7 62 -99 SPO 1997 10 04 14 54 64 3.3 -9 681.30 -58.0 -53.7 -56.8 62 -99 SPO 1997 10 04 14 55 64 3.2 -9 681.30 -58.0 -53.5 -56.8 61 -99 SPO 1997 10 04 14 56 66 3.4 -9 681.30 -58.0 -53.4 -56.8 61 -99 SPO 1997 10 04 14 57 66 3.5 -9 681.20 -58.0 -53.2 -56.8 60 -99 SPO 1997 10 04 14 58 66 3.5 -9 681.20 -58.0 -53.2 -56.9 60 -99 SPO 1997 10 04 14 59 65 3.5 -9 681.20 -58.0 -53.2 -56.9 60 -99 SPO 1997 10 04 15 00 64 3.5 -9 681.20 -58.0 -53.2 -56.9 60 0 SPO 1997 10 04 15 01 65 3.5 -9 681.20 -58.0 -53.2 -57.0 59 -99 SPO 1997 10 04 15 02 64 3.5 -9 681.20 -58.0 -53.2 -57.0 59 -99 SPO 1997 10 04 15 03 64 3.5 -9 681.20 -58.0 -53.2 -57.0 59 -99 SPO 1997 10 04 15 04 61 3.6 -9 681.20 -58.0 -53.0 -57.0 60 -99 SPO 1997 10 04 15 05 65 3.5 -9 681.20 -58.0 -53.2 -57.0 60 -99 SPO 1997 10 04 15 06 65 3.4 -9 681.20 -58.2 -53.2 -57.0 62 -99 SPO 1997 10 04 15 07 64 3.4 -9 681.20 -58.2 -53.4 -57.0 62 -99 SPO 1997 10 04 15 08 65 3.3 -9 681.20 -58.2 -53.5 -57.0 61 -99 SPO 1997 10 04 15 09 65 3.4 -9 681.20 -58.2 -53.2 -57.0 61 -99 SPO 1997 10 04 15 10 63 3.3 -9 681.20 -58.2 -53.4 -57.1 61 -99 SPO 1997 10 04 15 11 62 3.5 -9 681.10 -58.2 -53.7 -57.1 61 -99 SPO 1997 10 04 15 12 61 3.7 -9 681.10 -58.2 -53.4 -57.2 61 -99 SPO 1997 10 04 15 13 61 3.8 -9 681.10 -58.4 -53.2 -57.3 62 -99 SPO 1997 10 04 15 14 62 3.8 -9 681.10 -58.2 -52.7 -57.2 60 -99 SPO 1997 10 04 15 15 63 3.9 -9 681.10 -58.0 -52.4 -57.1 59 -99 SPO 1997 10 04 15 16 64 4.0 -9 681.10 -58.2 -52.5 -57.1 61 -99 SPO 1997 10 04 15 17 66 4.1 -9 681.10 -58.2 -52.7 -57.2 61 -99 SPO 1997 10 04 15 18 66 4.3 -9 681.10 -58.2 -52.7 -57.2 61 -99 SPO 1997 10 04 15 19 65 4.5 -9 681.10 -58.0 -53.0 -57.2 59 -99 SPO 1997 10 04 15 20 65 4.5 -9 681.10 -58.0 -52.7 -57.2 59 -99 SPO 1997 10 04 15 21 64 4.7 -9 681.10 -58.2 -53.0 -57.3 61 -99 SPO 1997 10 04 15 22 65 4.7 -9 681.10 -58.2 -53.7 -57.4 61 -99 SPO 1997 10 04 15 23 64 4.8 -9 681.10 -58.2 -54.0 -57.4 61 -99 SPO 1997 10 04 15 24 64 4.5 -9 681.10 -58.2 -54.2 -57.4 61 -99 SPO 1997 10 04 15 25 65 4.5 -9 681.10 -58.2 -54.0 -57.3 61 -99 SPO 1997 10 04 15 26 66 4.5 -9 681.10 -58.2 -53.9 -57.3 61 -99 SPO 1997 10 04 15 27 65 4.5 -9 681.10 -58.2 -54.0 -57.3 61 -99 SPO 1997 10 04 15 28 65 4.7 -9 681.10 -58.2 -53.9 -57.4 61 -99 SPO 1997 10 04 15 29 65 4.9 -9 681.10 -58.2 -53.7 -57.5 61 -99 SPO 1997 10 04 15 30 63 4.8 -9 681.10 -58.4 -53.0 -57.5 62 -99 SPO 1997 10 04 15 31 60 4.8 -9 681.10 -58.4 -52.9 -57.5 62 -99 SPO 1997 10 04 15 32 59 4.7 -9 681.10 -58.4 -53.0 -57.5 62 -99 SPO 1997 10 04 15 33 59 4.7 -9 681.10 -58.4 -53.5 -57.4 62 -99 SPO 1997 10 04 15 34 59 4.7 -9 681.20 -58.4 -53.7 -57.4 61 -99 SPO 1997 10 04 15 35 58 4.8 -9 681.20 -58.5 -53.7 -57.5 61 -99 SPO 1997 10 04 15 36 57 4.9 -9 681.20 -58.5 -53.5 -57.5 61 -99 SPO 1997 10 04 15 37 57 5.1 -9 681.10 -58.5 -53.2 -57.5 61 -99 SPO 1997 10 04 15 38 56 5.2 -9 681.10 -58.5 -53.0 -57.6 61 -99 SPO 1997 10 04 15 39 56 5.2 -9 681.10 -58.5 -52.7 -57.6 61 -99 SPO 1997 10 04 15 40 55 5.2 -9 681.10 -58.5 -52.7 -57.6 62 -99 SPO 1997 10 04 15 41 54 5.2 -9 681.10 -58.5 -52.7 -57.7 62 -99 SPO 1997 10 04 15 42 54 5.2 -9 681.10 -58.5 -52.5 -57.7 62 -99 SPO 1997 10 04 15 43 54 5.2 -9 681.10 -58.5 -52.4 -57.7 62 -99 SPO 1997 10 04 15 44 52 5.1 -9 681.10 -58.5 -52.4 -57.7 62 -99 SPO 1997 10 04 15 45 51 5.1 -9 681.10 -58.5 -52.5 -57.7 61 -99 SPO 1997 10 04 15 46 50 4.9 -9 681.10 -58.5 -52.5 -57.7 60 -99 SPO 1997 10 04 15 47 51 4.9 -9 681.10 -58.5 -52.7 -57.6 59 -99 SPO 1997 10 04 15 48 51 4.9 -9 681.10 -58.4 -52.5 -57.6 59 -99 SPO 1997 10 04 15 49 50 4.9 -9 681.10 -58.4 -52.2 -57.5 60 -99 SPO 1997 10 04 15 50 50 4.8 -9 681.10 -58.2 -52.2 -57.4 59 -99 SPO 1997 10 04 15 51 51 4.6 -9 681.10 -58.2 -52.0 -57.4 59 -99 SPO 1997 10 04 15 52 51 4.6 -9 681.10 -58.2 -52.2 -57.3 60 -99 SPO 1997 10 04 15 53 52 4.6 -9 681.10 -58.2 -52.0 -57.4 61 -99 SPO 1997 10 04 15 54 52 4.7 -9 681.10 -58.2 -52.2 -57.4 61 -99 SPO 1997 10 04 15 55 53 4.7 -9 681.10 -58.2 -52.2 -57.5 61 -99 SPO 1997 10 04 15 56 53 4.6 -9 681.10 -58.2 -52.0 -57.5 60 -99 SPO 1997 10 04 15 57 53 4.7 -9 681.10 -58.2 -52.0 -57.5 60 -99 SPO 1997 10 04 15 58 53 4.8 -9 681.10 -58.2 -52.0 -57.4 60 -99 SPO 1997 10 04 15 59 52 4.7 -9 681.10 -58.2 -52.0 -57.4 59 -99 SPO 1997 10 04 16 00 52 4.6 -9 681.10 -58.2 -52.0 -57.4 60 0 SPO 1997 10 04 16 01 53 4.5 -9 681.10 -58.2 -52.0 -57.3 60 -99 SPO 1997 10 04 16 02 53 4.4 -9 681.10 -58.2 -52.0 -57.3 61 -99 SPO 1997 10 04 16 03 54 4.3 -9 681.10 -58.2 -52.0 -57.3 61 -99 SPO 1997 10 04 16 04 55 4.3 -9 681.10 -58.2 -52.0 -57.3 62 -99 SPO 1997 10 04 16 05 56 4.4 -9 681.10 -58.2 -52.0 -57.3 62 -99 SPO 1997 10 04 16 06 56 4.5 -9 681.10 -58.2 -51.9 -57.3 62 -99 SPO 1997 10 04 16 07 56 4.6 -9 681.10 -58.4 -51.9 -57.4 62 -99 SPO 1997 10 04 16 08 54 4.7 -9 681.10 -58.4 -51.7 -57.4 61 -99 SPO 1997 10 04 16 09 53 4.5 -9 681.10 -58.4 -51.5 -57.3 61 -99 SPO 1997 10 04 16 10 52 4.3 -9 681.10 -58.2 -51.5 -57.2 59 -99 SPO 1997 10 04 16 11 50 4.1 -9 681.10 -58.2 -51.7 -57.2 59 -99 SPO 1997 10 04 16 12 49 4.1 -9 681.10 -58.2 -51.7 -57.1 59 -99 SPO 1997 10 04 16 13 50 4.1 -9 681.10 -58.2 -51.5 -57.1 60 -99 SPO 1997 10 04 16 14 51 3.9 -9 681.10 -58.2 -51.7 -57.1 60 -99 SPO 1997 10 04 16 15 52 3.6 -9 681.10 -58.2 -51.9 -57.0 61 -99 SPO 1997 10 04 16 16 52 3.8 -9 681.10 -58.2 -51.9 -57.0 61 -99 SPO 1997 10 04 16 17 53 3.7 -9 681.10 -58.2 -51.9 -57.1 62 -99 SPO 1997 10 04 16 18 53 3.7 -9 681.10 -58.2 -52.2 -57.1 62 -99 SPO 1997 10 04 16 19 51 3.8 -9 681.10 -58.2 -52.5 -57.2 62 -99 SPO 1997 10 04 16 20 52 3.9 -9 681.10 -58.2 -52.5 -57.2 62 -99 SPO 1997 10 04 16 21 52 3.8 -9 681.10 -58.4 -53.0 -57.3 62 -99 SPO 1997 10 04 16 22 52 3.8 -9 681.10 -58.4 -53.4 -57.4 62 -99 SPO 1997 10 04 16 23 52 3.7 -9 681.10 -58.2 -53.5 -57.4 60 -99 SPO 1997 10 04 16 24 52 3.7 -9 681.10 -58.4 -53.7 -57.4 62 -99 SPO 1997 10 04 16 25 52 3.6 -9 681.10 -58.2 -53.7 -57.5 61 -99 SPO 1997 10 04 16 26 52 3.6 -9 681.10 -58.2 -54.0 -57.5 61 -99 SPO 1997 10 04 16 27 53 3.7 -9 681.10 -58.2 -54.0 -57.6 62 -99 SPO 1997 10 04 16 28 54 3.8 -9 681.10 -58.4 -53.5 -57.6 62 -99 SPO 1997 10 04 16 29 54 3.8 -9 681.10 -58.4 -53.7 -57.6 62 -99 SPO 1997 10 04 16 30 54 3.7 -9 681.10 -58.4 -53.9 -57.7 62 -99 SPO 1997 10 04 16 31 56 3.5 -9 681.10 -58.5 -54.2 -57.6 62 -99 SPO 1997 10 04 16 32 57 3.2 -9 681.10 -58.4 -54.4 -57.7 60 -99 SPO 1997 10 04 16 33 57 3.1 -9 681.10 -58.4 -54.5 -57.7 60 -99 SPO 1997 10 04 16 34 57 3.1 -9 681.10 -58.5 -54.5 -57.7 61 -99 SPO 1997 10 04 16 35 59 3.0 -9 681.10 -58.5 -54.5 -57.7 61 -99 SPO 1997 10 04 16 36 62 2.9 -9 681.10 -58.4 -54.9 -57.6 60 -99 SPO 1997 10 04 16 37 66 2.7 -9 681.10 -58.5 -55.2 -57.6 61 -99 SPO 1997 10 04 16 38 67 2.7 -9 681.10 -58.5 -55.2 -57.5 61 -99 SPO 1997 10 04 16 39 69 2.8 -9 681.20 -58.4 -55.0 -57.3 60 -99 SPO 1997 10 04 16 40 69 3.0 -9 681.10 -58.4 -54.9 -57.2 60 -99 SPO 1997 10 04 16 41 69 3.0 -9 681.10 -58.2 -55.0 -57.3 59 -99 SPO 1997 10 04 16 42 70 2.8 -9 681.10 -58.4 -55.2 -57.5 62 -99 SPO 1997 10 04 16 43 68 2.6 -9 681.20 -58.5 -55.5 -57.6 62 -99 SPO 1997 10 04 16 44 70 2.8 -9 681.20 -58.7 -55.5 -57.7 63 -99 SPO 1997 10 04 16 45 71 2.9 -9 681.20 -58.7 -55.5 -57.7 62 -99 SPO 1997 10 04 16 46 72 2.9 -9 681.20 -58.5 -55.5 -57.6 60 -99 SPO 1997 10 04 16 47 72 2.9 -9 681.20 -58.7 -55.5 -57.6 61 -99 SPO 1997 10 04 16 48 71 3.1 -9 681.10 -58.7 -55.5 -57.6 61 -99 SPO 1997 10 04 16 49 68 3.1 -9 681.10 -58.7 -55.5 -57.7 61 -99 SPO 1997 10 04 16 50 67 3.2 -9 681.10 -58.7 -55.5 -57.8 61 -99 SPO 1997 10 04 16 51 63 3.0 -9 681.10 -58.9 -55.5 -57.9 63 -99 SPO 1997 10 04 16 52 60 3.0 -9 681.10 -59.0 -55.5 -58.0 64 -99 SPO 1997 10 04 16 53 59 3.0 -9 681.10 -59.0 -55.5 -58.1 64 -99 SPO 1997 10 04 16 54 58 2.9 -9 681.10 -59.0 -55.4 -58.1 63 -99 SPO 1997 10 04 16 55 57 2.9 -9 681.10 -58.9 -55.2 -58.1 62 -99 SPO 1997 10 04 16 56 57 3.0 -9 681.10 -58.7 -55.2 -58.0 60 -99 SPO 1997 10 04 16 57 58 3.0 -9 681.10 -58.7 -55.2 -58.0 59 -99 SPO 1997 10 04 16 58 61 3.0 -9 681.10 -58.7 -55.4 -57.9 60 -99 SPO 1997 10 04 16 59 63 2.9 -9 681.10 -58.7 -55.5 -57.8 60 -99 SPO 1997 10 04 17 00 64 2.9 -9 681.10 -58.7 -55.5 -57.6 61 0 SPO 1997 10 04 17 01 63 2.9 -9 681.10 -58.7 -55.5 -57.6 61 -99 SPO 1997 10 04 17 02 60 3.0 -9 681.10 -58.7 -55.5 -57.5 62 -99 SPO 1997 10 04 17 03 58 3.1 -9 681.10 -58.5 -55.2 -57.5 61 -99 SPO 1997 10 04 17 04 59 3.5 -9 681.20 -58.5 -55.0 -57.5 61 -99 SPO 1997 10 04 17 05 62 3.7 -9 681.20 -58.5 -55.0 -57.5 61 -99 SPO 1997 10 04 17 06 63 3.8 -9 681.20 -58.5 -55.2 -57.5 62 -99 SPO 1997 10 04 17 07 64 3.6 -9 681.20 -58.5 -55.4 -57.5 62 -99 SPO 1997 10 04 17 08 64 3.6 -9 681.20 -58.5 -55.5 -57.5 62 -99 SPO 1997 10 04 17 09 61 3.4 -9 681.20 -58.7 -55.5 -57.5 63 -99 SPO 1997 10 04 17 10 59 3.4 -9 681.20 -58.7 -55.5 -57.5 62 -99 SPO 1997 10 04 17 11 59 3.3 -9 681.20 -58.7 -55.5 -57.5 62 -99 SPO 1997 10 04 17 12 57 3.4 -9 681.20 -58.7 -55.5 -57.4 62 -99 SPO 1997 10 04 17 13 59 3.5 -9 681.20 -58.7 -55.4 -57.4 61 -99 SPO 1997 10 04 17 14 59 3.8 -9 681.20 -58.7 -55.2 -57.6 62 -99 SPO 1997 10 04 17 15 58 3.9 -9 681.20 -58.7 -55.0 -57.7 62 -99 SPO 1997 10 04 17 16 56 4.0 -9 681.10 -58.7 -54.7 -57.7 62 -99 SPO 1997 10 04 17 17 57 4.0 -9 681.20 -58.7 -54.5 -57.8 62 -99 SPO 1997 10 04 17 18 57 3.9 -9 681.20 -58.7 -54.5 -57.8 62 -99 SPO 1997 10 04 17 19 58 3.9 -9 681.20 -58.7 -54.5 -57.7 62 -99 SPO 1997 10 04 17 20 58 4.0 -9 681.20 -58.7 -54.4 -57.6 62 -99 SPO 1997 10 04 17 21 59 3.9 -9 681.20 -58.7 -54.0 -57.6 61 -99 SPO 1997 10 04 17 22 59 4.1 -9 681.10 -58.7 -54.0 -57.7 61 -99 SPO 1997 10 04 17 23 57 4.3 -9 681.10 -58.7 -53.7 -57.7 61 -99 SPO 1997 10 04 17 24 56 4.4 -9 681.10 -58.5 -53.5 -57.6 59 -99 SPO 1997 10 04 17 25 56 4.2 -9 681.10 -58.5 -53.4 -57.6 60 -99 SPO 1997 10 04 17 26 55 4.0 -9 681.10 -58.7 -53.5 -57.6 62 -99 SPO 1997 10 04 17 27 55 4.1 -9 681.10 -58.5 -53.5 -57.6 61 -99 SPO 1997 10 04 17 28 56 4.1 -9 681.10 -58.5 -53.5 -57.5 62 -99 SPO 1997 10 04 17 29 56 4.0 -9 681.10 -58.5 -53.7 -57.5 62 -99 SPO 1997 10 04 17 30 57 4.1 -9 681.10 -58.5 -53.9 -57.5 62 -99 SPO 1997 10 04 17 31 59 4.1 -9 681.10 -58.5 -53.7 -57.6 62 -99 SPO 1997 10 04 17 32 60 4.0 -9 681.10 -58.5 -54.0 -57.6 62 -99 SPO 1997 10 04 17 33 60 3.9 -9 681.10 -58.7 -54.0 -57.6 64 -99 SPO 1997 10 04 17 34 61 4.0 -9 681.20 -58.7 -54.2 -57.6 64 -99 SPO 1997 10 04 17 35 63 4.0 -9 681.20 -58.7 -54.0 -57.7 63 -99 SPO 1997 10 04 17 36 64 4.0 -9 681.20 -58.5 -53.9 -57.7 62 -99 SPO 1997 10 04 17 37 62 3.8 -9 681.20 -58.5 -54.2 -57.7 62 -99 SPO 1997 10 04 17 38 60 3.5 -9 681.20 -58.5 -54.5 -57.6 62 -99 SPO 1997 10 04 17 39 60 3.2 -9 681.20 -58.5 -55.0 -57.5 63 -99 SPO 1997 10 04 17 40 61 3.1 -9 681.20 -58.5 -55.4 -57.4 63 -99 SPO 1997 10 04 17 41 62 3.0 -9 681.20 -58.5 -55.5 -57.4 64 -99 SPO 1997 10 04 17 42 63 2.9 -9 681.20 -58.5 -55.5 -57.3 64 -99 SPO 1997 10 04 17 43 62 3.0 -9 681.30 -58.5 -55.5 -57.3 63 -99 SPO 1997 10 04 17 44 60 3.1 -9 681.20 -58.5 -55.4 -57.2 63 -99 SPO 1997 10 04 17 45 59 3.2 -9 681.20 -58.4 -55.2 -57.2 62 -99 SPO 1997 10 04 17 46 59 3.0 -9 681.20 -58.4 -55.0 -57.1 62 -99 SPO 1997 10 04 17 47 60 2.9 -9 681.20 -58.4 -55.0 -57.0 61 -99 SPO 1997 10 04 17 48 57 2.7 -9 681.30 -58.2 -54.7 -57.0 61 -99 SPO 1997 10 04 17 49 58 2.6 -9 681.30 -58.2 -54.7 -56.9 62 -99 SPO 1997 10 04 17 50 58 2.5 -9 681.30 -58.2 -54.9 -56.9 62 -99 SPO 1997 10 04 17 51 59 2.8 -9 681.30 -58.2 -55.0 -56.9 63 -99 SPO 1997 10 04 17 52 58 2.8 -9 681.30 -58.2 -55.0 -56.9 64 -99 SPO 1997 10 04 17 53 60 2.7 -9 681.30 -58.2 -55.2 -56.9 64 -99 SPO 1997 10 04 17 54 62 2.7 -9 681.30 -58.2 -55.2 -57.0 64 -99 SPO 1997 10 04 17 55 62 2.8 -9 681.30 -58.4 -55.2 -57.0 66 -99 SPO 1997 10 04 17 56 60 2.6 -9 681.30 -58.4 -55.2 -57.0 66 -99 SPO 1997 10 04 17 57 57 2.4 -9 681.30 -58.4 -55.5 -57.0 64 -99 SPO 1997 10 04 17 58 57 2.4 -9 681.40 -58.5 -55.7 -56.9 65 -99 SPO 1997 10 04 17 59 56 2.2 -9 681.40 -58.5 -55.7 -56.9 64 -99 SPO 1997 10 04 18 00 54 2.0 -9 681.40 -58.5 -56.0 -56.9 64 0 SPO 1997 10 04 18 01 58 1.9 -9 681.40 -58.5 -56.0 -56.9 64 -99 SPO 1997 10 04 18 02 59 2.2 -9 681.40 -58.5 -56.0 -56.8 65 -99 SPO 1997 10 04 18 03 57 2.3 -9 681.40 -58.5 -55.7 -56.8 65 -99 SPO 1997 10 04 18 04 54 2.3 -9 681.40 -58.4 -55.4 -56.8 64 -99 SPO 1997 10 04 18 05 55 2.3 -9 681.40 -58.4 -55.2 -56.8 65 -99 SPO 1997 10 04 18 06 56 2.3 -9 681.40 -58.4 -55.2 -56.8 66 -99 SPO 1997 10 04 18 07 56 2.4 -9 681.40 -58.4 -55.0 -56.8 66 -99 SPO 1997 10 04 18 08 58 2.4 -9 681.50 -58.4 -54.7 -56.8 66 -99 SPO 1997 10 04 18 09 61 2.4 -9 681.50 -58.4 -54.7 -56.8 66 -99 SPO 1997 10 04 18 10 64 2.4 -9 681.50 -58.4 -54.5 -56.6 66 -99 SPO 1997 10 04 18 11 69 2.3 -9 681.50 -58.4 -54.5 -56.4 66 -99 SPO 1997 10 04 18 12 74 2.1 -9 681.50 -58.4 -54.7 -56.3 66 -99 SPO 1997 10 04 18 13 81 2.0 -9 681.60 -58.4 -55.0 -56.6 66 -99 SPO 1997 10 04 18 14 86 1.8 -9 681.60 -58.2 -55.5 -56.7 64 -99 SPO 1997 10 04 18 15 94 1.8 -9 681.60 -58.0 -55.7 -56.6 63 -99 SPO 1997 10 04 18 16 105 2.0 -9 681.60 -58.0 -55.7 -56.6 65 -99 SPO 1997 10 04 18 17 104 2.2 -9 681.60 -58.0 -55.7 -56.6 66 -99 SPO 1997 10 04 18 18 100 2.4 -9 681.60 -58.0 -55.7 -56.7 66 -99 SPO 1997 10 04 18 19 100 2.4 -9 681.60 -58.2 -55.7 -56.8 67 -99 SPO 1997 10 04 18 20 100 2.4 -9 681.60 -58.2 -55.5 -56.9 67 -99 SPO 1997 10 04 18 21 106 2.5 -9 681.70 -58.2 -55.5 -56.9 66 -99 SPO 1997 10 04 18 22 109 2.5 -9 681.70 -58.0 -55.5 -56.8 63 -99 SPO 1997 10 04 18 23 109 2.5 -9 681.70 -58.0 -55.0 -56.7 63 -99 SPO 1997 10 04 18 24 109 2.5 -9 681.70 -58.2 -55.4 -56.8 65 -99 SPO 1997 10 04 18 25 107 2.6 -9 681.70 -58.2 -55.5 -57.0 65 -99 SPO 1997 10 04 18 26 106 2.5 -9 681.70 -58.4 -55.5 -57.1 68 -99 SPO 1997 10 04 18 27 109 2.5 -9 681.70 -58.2 -55.5 -57.0 66 -99 SPO 1997 10 04 18 28 111 2.4 -9 681.70 -58.0 -55.5 -56.8 65 -99 SPO 1997 10 04 18 29 112 2.5 -9 681.70 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 04 18 30 112 2.5 -9 681.60 -57.9 -55.5 -56.7 66 -99 SPO 1997 10 04 18 31 112 2.5 -9 681.60 -58.0 -55.4 -56.8 66 -99 SPO 1997 10 04 18 32 112 2.4 -9 681.60 -58.0 -55.4 -56.8 67 -99 SPO 1997 10 04 18 33 112 2.3 -9 681.60 -57.9 -55.5 -56.8 67 -99 SPO 1997 10 04 18 34 112 2.2 -9 681.70 -57.7 -55.5 -56.6 64 -99 SPO 1997 10 04 18 35 116 2.1 -9 681.70 -57.4 -55.5 -56.3 63 -99 SPO 1997 10 04 18 36 125 2.2 -9 681.60 -57.5 -55.7 -56.3 64 -99 SPO 1997 10 04 18 37 125 2.1 -9 681.60 -57.4 -55.5 -56.2 63 -99 SPO 1997 10 04 18 38 126 2.1 -9 681.60 -57.4 -55.5 -56.2 64 -99 SPO 1997 10 04 18 39 125 2.0 -9 681.60 -57.5 -55.5 -56.4 65 -99 SPO 1997 10 04 18 40 125 2.0 -9 681.60 -57.5 -55.5 -56.4 64 -99 SPO 1997 10 04 18 41 125 2.1 -9 681.70 -57.7 -55.7 -56.5 66 -99 SPO 1997 10 04 18 42 125 2.2 -9 681.60 -57.5 -55.7 -56.5 64 -99 SPO 1997 10 04 18 43 125 2.2 -9 681.60 -57.7 -55.4 -56.6 66 -99 SPO 1997 10 04 18 44 125 2.3 -9 681.70 -57.7 -55.4 -56.7 66 -99 SPO 1997 10 04 18 45 125 2.4 -9 681.60 -57.7 -55.5 -56.7 67 -99 SPO 1997 10 04 18 46 121 2.4 -9 681.60 -58.2 -55.4 -57.1 70 -99 SPO 1997 10 04 18 47 116 2.7 -9 681.60 -58.5 -55.2 -57.5 71 -99 SPO 1997 10 04 18 48 114 2.7 -9 681.50 -58.5 -55.2 -57.6 69 -99 SPO 1997 10 04 18 49 112 2.7 -9 681.60 -58.7 -55.2 -57.6 67 -99 SPO 1997 10 04 18 50 111 2.7 -9 681.60 -58.7 -55.2 -57.6 65 -99 SPO 1997 10 04 18 51 108 2.7 -9 681.50 -58.5 -55.2 -57.6 63 -99 SPO 1997 10 04 18 52 106 2.8 -9 681.50 -58.5 -55.2 -57.6 63 -99 SPO 1997 10 04 18 53 102 2.8 -9 681.50 -58.5 -55.0 -57.6 63 -99 SPO 1997 10 04 18 54 99 2.8 -9 681.40 -58.5 -54.9 -57.5 63 -99 SPO 1997 10 04 18 55 96 3.0 -9 681.40 -58.5 -54.9 -57.4 63 -99 SPO 1997 10 04 18 56 94 3.0 -9 681.40 -58.5 -54.7 -57.4 63 -99 SPO 1997 10 04 18 57 94 3.0 -9 681.50 -58.7 -54.7 -57.4 65 -99 SPO 1997 10 04 18 58 93 3.1 -9 681.40 -58.7 -54.9 -57.5 64 -99 SPO 1997 10 04 18 59 90 3.4 -9 681.40 -58.7 -54.9 -57.5 64 -99 SPO 1997 10 04 19 00 87 3.5 -9 681.40 -58.9 -54.7 -57.4 65 0 SPO 1997 10 04 19 01 85 3.5 -9 681.40 -59.0 -54.5 -57.5 64 -99 SPO 1997 10 04 19 02 85 3.5 -9 681.40 -59.0 -54.4 -57.5 64 -99 SPO 1997 10 04 19 03 84 3.5 -9 681.40 -59.0 -54.2 -57.5 64 -99 SPO 1997 10 04 19 04 84 3.5 -9 681.40 -59.0 -54.4 -57.5 64 -99 SPO 1997 10 04 19 05 85 3.5 -9 681.40 -59.0 -54.5 -57.5 63 -99 SPO 1997 10 04 19 06 85 3.5 -9 681.40 -59.0 -54.5 -57.5 63 -99 SPO 1997 10 04 19 07 83 3.5 -9 681.30 -59.0 -54.4 -57.5 63 -99 SPO 1997 10 04 19 08 81 3.6 -9 681.30 -59.2 -54.4 -57.6 64 -99 SPO 1997 10 04 19 09 79 3.7 -9 681.30 -59.2 -54.4 -57.6 64 -99 SPO 1997 10 04 19 10 77 3.9 -9 681.20 -59.2 -54.4 -57.7 64 -99 SPO 1997 10 04 19 11 77 4.0 -9 681.20 -59.2 -54.4 -57.8 63 -99 SPO 1997 10 04 19 12 77 4.0 -9 681.20 -59.2 -54.4 -57.9 62 -99 SPO 1997 10 04 19 13 74 4.2 -9 681.20 -59.2 -54.4 -57.9 61 -99 SPO 1997 10 04 19 14 72 4.4 -9 681.10 -59.2 -54.0 -58.0 61 -99 SPO 1997 10 04 19 15 71 4.6 -9 681.10 -59.2 -53.5 -58.0 61 -99 SPO 1997 10 04 19 16 70 4.7 -9 681.10 -59.0 -53.2 -58.1 61 -99 SPO 1997 10 04 19 17 70 4.8 -9 681.10 -59.0 -53.0 -58.1 61 -99 SPO 1997 10 04 19 18 70 4.9 -9 681.10 -58.9 -53.4 -58.0 61 -99 SPO 1997 10 04 19 19 70 4.9 -9 681.10 -58.7 -53.5 -58.0 61 -99 SPO 1997 10 04 19 20 69 4.9 -9 681.10 -58.7 -53.9 -58.0 61 -99 SPO 1997 10 04 19 21 68 5.0 -9 681.10 -58.7 -53.5 -57.9 62 -99 SPO 1997 10 04 19 22 68 5.1 -9 681.10 -58.5 -53.4 -57.8 61 -99 SPO 1997 10 04 19 23 68 5.2 -9 681.10 -58.5 -52.7 -57.8 61 -99 SPO 1997 10 04 19 24 66 5.5 -9 681.00 -58.5 -52.4 -57.8 62 -99 SPO 1997 10 04 19 25 66 5.6 -9 681.00 -58.5 -52.4 -57.8 62 -99 SPO 1997 10 04 19 26 66 5.8 -9 681.00 -58.5 -52.5 -57.9 62 -99 SPO 1997 10 04 19 27 66 5.9 -9 681.00 -58.5 -52.7 -57.9 63 -99 SPO 1997 10 04 19 28 67 6.0 -9 681.00 -58.4 -52.9 -57.8 63 -99 SPO 1997 10 04 19 29 66 6.0 -9 681.00 -58.4 -53.5 -57.9 63 -99 SPO 1997 10 04 19 30 66 5.7 -9 681.00 -58.4 -54.0 -57.8 63 -99 SPO 1997 10 04 19 31 65 5.4 -9 681.00 -58.4 -54.2 -57.8 63 -99 SPO 1997 10 04 19 32 63 5.3 -9 681.10 -58.4 -54.5 -57.8 63 -99 SPO 1997 10 04 19 33 64 4.9 -9 681.10 -58.2 -54.7 -57.7 62 -99 SPO 1997 10 04 19 34 65 4.7 -9 681.10 -58.2 -54.7 -57.6 62 -99 SPO 1997 10 04 19 35 66 4.5 -9 681.10 -58.2 -54.7 -57.6 62 -99 SPO 1997 10 04 19 36 67 4.5 -9 681.10 -58.2 -54.9 -57.6 62 -99 SPO 1997 10 04 19 37 67 4.6 -9 681.10 -58.2 -55.0 -57.6 62 -99 SPO 1997 10 04 19 38 66 4.6 -9 681.10 -58.0 -55.0 -57.6 61 -99 SPO 1997 10 04 19 39 65 4.7 -9 681.10 -58.2 -55.0 -57.7 63 -99 SPO 1997 10 04 19 40 66 4.8 -9 681.10 -58.2 -55.0 -57.8 63 -99 SPO 1997 10 04 19 41 66 4.8 -9 681.20 -58.2 -55.0 -57.8 63 -99 SPO 1997 10 04 19 42 66 4.7 -9 681.20 -58.2 -55.0 -57.9 63 -99 SPO 1997 10 04 19 43 66 4.7 -9 681.20 -58.2 -55.2 -58.0 62 -99 SPO 1997 10 04 19 44 64 4.7 -9 681.20 -58.2 -55.2 -57.9 62 -99 SPO 1997 10 04 19 45 64 4.8 -9 681.20 -58.2 -55.0 -57.9 62 -99 SPO 1997 10 04 19 46 65 4.6 -9 681.20 -58.4 -55.0 -57.9 63 -99 SPO 1997 10 04 19 47 62 4.7 -9 681.10 -58.4 -55.0 -57.9 62 -99 SPO 1997 10 04 19 48 61 4.8 -9 681.10 -58.2 -54.9 -57.9 61 -99 SPO 1997 10 04 19 49 62 5.1 -9 681.10 -58.2 -54.7 -57.9 61 -99 SPO 1997 10 04 19 50 61 5.2 -9 681.10 -58.4 -54.5 -57.9 62 -99 SPO 1997 10 04 19 51 59 5.1 -9 681.10 -58.4 -54.5 -57.9 62 -99 SPO 1997 10 04 19 52 58 5.0 -9 681.10 -58.2 -54.4 -57.8 62 -99 SPO 1997 10 04 19 53 58 5.0 -9 681.00 -58.2 -54.2 -57.8 62 -99 SPO 1997 10 04 19 54 57 5.1 -9 681.00 -58.2 -54.2 -57.8 62 -99 SPO 1997 10 04 19 55 56 5.1 -9 681.00 -58.2 -54.0 -57.8 62 -99 SPO 1997 10 04 19 56 55 5.0 -9 681.00 -58.0 -53.5 -57.7 61 -99 SPO 1997 10 04 19 57 55 5.1 -9 681.00 -58.0 -53.2 -57.8 62 -99 SPO 1997 10 04 19 58 55 5.1 -9 681.00 -58.0 -53.2 -57.8 62 -99 SPO 1997 10 04 19 59 56 5.1 -9 681.00 -58.0 -53.0 -57.8 62 -99 SPO 1997 10 04 20 00 56 5.2 -9 681.00 -58.0 -53.0 -57.8 62 0 SPO 1997 10 04 20 01 55 5.3 -9 681.00 -58.0 -53.0 -57.7 62 -99 SPO 1997 10 04 20 02 55 5.3 -9 681.00 -58.0 -52.9 -57.7 62 -99 SPO 1997 10 04 20 03 55 5.3 -9 680.90 -57.9 -52.9 -57.7 62 -99 SPO 1997 10 04 20 04 55 5.3 -9 680.90 -57.9 -53.0 -57.7 64 -99 SPO 1997 10 04 20 05 56 5.1 -9 680.90 -57.9 -52.9 -57.6 64 -99 SPO 1997 10 04 20 06 55 4.9 -9 680.90 -57.9 -52.7 -57.6 65 -99 SPO 1997 10 04 20 07 55 4.6 -9 680.90 -57.7 -52.7 -57.6 63 -99 SPO 1997 10 04 20 08 54 4.3 -9 681.00 -57.7 -52.7 -57.6 63 -99 SPO 1997 10 04 20 09 55 4.2 -9 681.00 -57.7 -52.9 -57.5 63 -99 SPO 1997 10 04 20 10 57 4.1 -9 681.00 -57.7 -53.2 -57.5 63 -99 SPO 1997 10 04 20 11 57 4.0 -9 681.10 -57.7 -53.2 -57.5 63 -99 SPO 1997 10 04 20 12 57 4.0 -9 681.10 -57.7 -53.2 -57.4 63 -99 SPO 1997 10 04 20 13 59 3.8 -9 681.10 -57.7 -53.4 -57.4 64 -99 SPO 1997 10 04 20 14 60 3.6 -9 681.10 -57.7 -53.7 -57.4 64 -99 SPO 1997 10 04 20 15 60 3.5 -9 681.10 -57.5 -53.7 -57.3 63 -99 SPO 1997 10 04 20 16 62 3.3 -9 681.20 -57.5 -53.9 -57.3 64 -99 SPO 1997 10 04 20 17 68 3.0 -9 681.20 -57.5 -54.2 -57.3 64 -99 SPO 1997 10 04 20 18 72 2.9 -9 681.20 -57.5 -54.4 -57.2 64 -99 SPO 1997 10 04 20 19 76 2.9 -9 681.30 -57.5 -54.5 -57.2 65 -99 SPO 1997 10 04 20 20 79 2.9 -9 681.30 -57.7 -54.9 -57.2 67 -99 SPO 1997 10 04 20 21 77 2.8 -9 681.30 -57.7 -54.9 -57.2 66 -99 SPO 1997 10 04 20 22 76 3.0 -9 681.30 -57.7 -54.7 -57.2 66 -99 SPO 1997 10 04 20 23 77 3.2 -9 681.30 -57.9 -54.7 -57.3 66 -99 SPO 1997 10 04 20 24 77 3.4 -9 681.20 -57.9 -55.0 -57.4 66 -99 SPO 1997 10 04 20 25 75 3.5 -9 681.20 -57.9 -54.7 -57.4 66 -99 SPO 1997 10 04 20 26 71 3.6 -9 681.20 -58.0 -54.5 -57.6 66 -99 SPO 1997 10 04 20 27 69 3.5 -9 681.20 -58.0 -54.2 -57.6 66 -99 SPO 1997 10 04 20 28 70 3.3 -9 681.30 -58.0 -54.2 -57.7 65 -99 SPO 1997 10 04 20 29 72 3.2 -9 681.30 -58.0 -54.2 -57.6 65 -99 SPO 1997 10 04 20 30 70 3.4 -9 681.30 -58.0 -54.2 -57.6 65 -99 SPO 1997 10 04 20 31 64 3.7 -9 681.20 -58.0 -53.5 -57.7 63 -99 SPO 1997 10 04 20 32 60 3.7 -9 681.20 -58.0 -53.0 -57.7 63 -99 SPO 1997 10 04 20 33 62 3.7 -9 681.30 -57.9 -52.9 -57.7 62 -99 SPO 1997 10 04 20 34 62 3.7 -9 681.30 -57.9 -52.7 -57.7 62 -99 SPO 1997 10 04 20 35 63 3.7 -9 681.20 -57.9 -52.5 -57.7 62 -99 SPO 1997 10 04 20 36 65 3.6 -9 681.30 -57.9 -52.4 -57.7 62 -99 SPO 1997 10 04 20 37 62 3.5 -9 681.30 -57.9 -52.0 -57.7 62 -99 SPO 1997 10 04 20 38 60 3.5 -9 681.30 -57.9 -51.7 -57.7 62 -99 SPO 1997 10 04 20 39 63 3.4 -9 681.30 -57.7 -51.7 -57.7 61 -99 SPO 1997 10 04 20 40 68 3.1 -9 681.30 -57.7 -51.9 -57.6 63 -99 SPO 1997 10 04 20 41 68 3.0 -9 681.30 -57.7 -52.0 -57.6 63 -99 SPO 1997 10 04 20 42 64 3.2 -9 681.30 -57.7 -51.7 -57.6 63 -99 SPO 1997 10 04 20 43 65 3.3 -9 681.30 -57.9 -51.5 -57.6 65 -99 SPO 1997 10 04 20 44 65 3.4 -9 681.30 -57.9 -51.4 -57.7 64 -99 SPO 1997 10 04 20 45 66 3.4 -9 681.30 -57.9 -51.4 -57.7 64 -99 SPO 1997 10 04 20 46 65 3.3 -9 681.30 -57.9 -51.2 -57.7 64 -99 SPO 1997 10 04 20 47 66 3.1 -9 681.30 -57.9 -51.5 -57.7 62 -99 SPO 1997 10 04 20 48 64 3.1 -9 681.40 -57.9 -52.2 -57.7 62 -99 SPO 1997 10 04 20 49 63 3.3 -9 681.30 -57.9 -52.5 -57.7 62 -99 SPO 1997 10 04 20 50 63 3.5 -9 681.30 -58.0 -52.7 -57.8 63 -99 SPO 1997 10 04 20 51 62 3.5 -9 681.30 -58.0 -52.9 -57.8 63 -99 SPO 1997 10 04 20 52 62 3.3 -9 681.30 -58.0 -53.2 -57.8 63 -99 SPO 1997 10 04 20 53 68 2.8 -9 681.40 -58.0 -53.5 -57.8 63 -99 SPO 1997 10 04 20 54 75 2.3 -9 681.40 -58.0 -54.2 -57.8 62 -99 SPO 1997 10 04 20 55 76 2.1 -9 681.40 -58.0 -54.2 -57.7 62 -99 SPO 1997 10 04 20 56 77 1.9 -9 681.40 -58.2 -54.4 -57.8 64 -99 SPO 1997 10 04 20 57 73 2.1 -9 681.40 -58.2 -54.0 -57.8 63 -99 SPO 1997 10 04 20 58 69 2.3 -9 681.40 -58.2 -53.0 -57.8 62 -99 SPO 1997 10 04 20 59 73 2.1 -9 681.40 -58.2 -53.2 -57.8 62 -99 SPO 1997 10 04 21 00 77 2.1 -9 681.40 -58.2 -53.9 -57.9 61 0 SPO 1997 10 04 21 01 71 2.2 -9 681.40 -58.2 -53.7 -57.9 61 -99 SPO 1997 10 04 21 02 67 2.5 -9 681.40 -58.2 -53.4 -57.8 61 -99 SPO 1997 10 04 21 03 68 2.6 -9 681.40 -58.2 -53.4 -57.8 61 -99 SPO 1997 10 04 21 04 69 2.5 -9 681.40 -58.4 -53.5 -57.9 62 -99 SPO 1997 10 04 21 05 69 2.6 -9 681.40 -58.4 -53.7 -57.9 62 -99 SPO 1997 10 04 21 06 68 2.7 -9 681.40 -58.4 -53.7 -57.9 62 -99 SPO 1997 10 04 21 07 74 2.7 -9 681.40 -58.4 -53.7 -58.0 63 -99 SPO 1997 10 04 21 08 73 2.8 -9 681.40 -58.5 -53.7 -58.0 63 -99 SPO 1997 10 04 21 09 68 2.8 -9 681.40 -58.5 -53.4 -58.0 62 -99 SPO 1997 10 04 21 10 69 2.6 -9 681.40 -58.5 -53.4 -58.0 62 -99 SPO 1997 10 04 21 11 75 2.4 -9 681.40 -58.5 -54.0 -58.1 60 -99 SPO 1997 10 04 21 12 79 2.2 -9 681.50 -58.7 -55.0 -58.2 61 -99 SPO 1997 10 04 21 13 79 2.2 -9 681.50 -58.7 -55.0 -58.3 61 -99 SPO 1997 10 04 21 14 80 2.2 -9 681.50 -58.5 -55.2 -58.3 60 -99 SPO 1997 10 04 21 15 82 2.2 -9 681.50 -58.5 -55.2 -58.3 61 -99 SPO 1997 10 04 21 16 82 2.2 -9 681.50 -58.5 -55.2 -58.3 61 -99 SPO 1997 10 04 21 17 76 2.4 -9 681.40 -58.7 -55.0 -58.3 61 -99 SPO 1997 10 04 21 18 69 2.5 -9 681.40 -58.9 -55.0 -58.3 63 -99 SPO 1997 10 04 21 19 66 2.7 -9 681.40 -59.0 -55.0 -58.4 64 -99 SPO 1997 10 04 21 20 68 2.9 -9 681.40 -59.0 -55.2 -58.4 62 -99 SPO 1997 10 04 21 21 69 2.9 -9 681.40 -59.0 -55.0 -58.5 61 -99 SPO 1997 10 04 21 22 65 3.0 -9 681.40 -59.2 -55.0 -58.6 62 -99 SPO 1997 10 04 21 23 62 2.9 -9 681.40 -59.2 -54.5 -58.7 61 -99 SPO 1997 10 04 21 24 64 2.9 -9 681.40 -59.0 -54.7 -58.6 60 -99 SPO 1997 10 04 21 25 64 3.0 -9 681.40 -59.0 -55.0 -58.6 61 -99 SPO 1997 10 04 21 26 64 3.0 -9 681.40 -59.0 -55.0 -58.6 61 -99 SPO 1997 10 04 21 27 63 3.2 -9 681.40 -59.0 -55.0 -58.6 61 -99 SPO 1997 10 04 21 28 62 3.3 -9 681.30 -59.0 -55.0 -58.6 61 -99 SPO 1997 10 04 21 29 60 3.5 -9 681.30 -59.0 -54.9 -58.6 61 -99 SPO 1997 10 04 21 30 57 3.7 -9 681.30 -58.7 -54.5 -58.6 59 -99 SPO 1997 10 04 21 31 57 3.6 -9 681.30 -58.7 -54.5 -58.6 60 -99 SPO 1997 10 04 21 32 61 3.5 -9 681.30 -58.7 -54.5 -58.5 60 -99 SPO 1997 10 04 21 33 61 3.5 -9 681.30 -58.7 -55.0 -58.5 60 -99 SPO 1997 10 04 21 34 58 3.6 -9 681.30 -58.7 -55.0 -58.5 60 -99 SPO 1997 10 04 21 35 55 3.8 -9 681.30 -58.5 -54.9 -58.4 58 -99 SPO 1997 10 04 21 36 55 3.9 -9 681.20 -58.5 -54.7 -58.4 58 -99 SPO 1997 10 04 21 37 55 3.9 -9 681.20 -58.5 -54.7 -58.4 60 -99 SPO 1997 10 04 21 38 58 3.8 -9 681.30 -58.5 -54.5 -58.4 61 -99 SPO 1997 10 04 21 39 60 3.8 -9 681.30 -58.5 -54.7 -58.4 62 -99 SPO 1997 10 04 21 40 57 4.1 -9 681.20 -58.5 -54.5 -58.4 62 -99 SPO 1997 10 04 21 41 54 4.4 -9 681.20 -58.5 -54.2 -58.4 62 -99 SPO 1997 10 04 21 42 52 4.4 -9 681.20 -58.5 -54.0 -58.4 62 -99 SPO 1997 10 04 21 43 52 4.4 -9 681.20 -58.5 -54.0 -58.3 62 -99 SPO 1997 10 04 21 44 50 4.5 -9 681.10 -58.4 -53.7 -58.3 61 -99 SPO 1997 10 04 21 45 49 4.5 -9 681.10 -58.2 -53.7 -58.2 59 -99 SPO 1997 10 04 21 46 51 4.4 -9 681.10 -58.2 -54.0 -58.2 59 -99 SPO 1997 10 04 21 47 49 4.5 -9 681.10 -58.2 -54.4 -58.1 59 -99 SPO 1997 10 04 21 48 48 4.4 -9 681.20 -58.0 -54.4 -58.1 58 -99 SPO 1997 10 04 21 49 48 4.2 -9 681.20 -58.0 -54.2 -58.0 59 -99 SPO 1997 10 04 21 50 48 4.2 -9 681.20 -58.0 -53.9 -58.0 61 -99 SPO 1997 10 04 21 51 46 4.5 -9 681.20 -58.0 -53.5 -58.0 61 -99 SPO 1997 10 04 21 52 46 4.7 -9 681.10 -58.0 -53.4 -58.0 62 -99 SPO 1997 10 04 21 53 48 4.6 -9 681.10 -58.0 -53.2 -57.9 62 -99 SPO 1997 10 04 21 54 49 4.6 -9 681.10 -57.9 -53.4 -57.8 62 -99 SPO 1997 10 04 21 55 49 4.8 -9 681.10 -57.7 -53.4 -57.8 60 -99 SPO 1997 10 04 21 56 47 4.9 -9 681.10 -57.7 -53.4 -57.7 60 -99 SPO 1997 10 04 21 57 45 5.2 -9 681.10 -57.5 -53.0 -57.6 59 -99 SPO 1997 10 04 21 58 43 5.4 -9 681.10 -57.5 -52.7 -57.6 61 -99 SPO 1997 10 04 21 59 44 5.2 -9 681.10 -57.4 -52.5 -57.4 60 -99 SPO 1997 10 04 22 00 45 4.9 -9 681.10 -57.2 -52.7 -57.4 60 0 SPO 1997 10 04 22 01 45 4.8 -9 681.10 -57.2 -52.7 -57.3 60 -99 SPO 1997 10 04 22 02 44 5.1 -9 681.10 -57.2 -52.7 -57.3 62 -99 SPO 1997 10 04 22 03 44 5.1 -9 681.10 -57.0 -52.7 -57.2 61 -99 SPO 1997 10 04 22 04 44 5.1 -9 681.10 -57.0 -52.5 -57.2 62 -99 SPO 1997 10 04 22 05 44 4.8 -9 681.10 -57.0 -52.5 -57.1 63 -99 SPO 1997 10 04 22 06 43 4.6 -9 681.10 -57.0 -52.4 -57.1 63 -99 SPO 1997 10 04 22 07 41 4.7 -9 681.10 -57.0 -52.2 -57.0 64 -99 SPO 1997 10 04 22 08 39 4.9 -9 681.10 -57.0 -52.2 -57.0 63 -99 SPO 1997 10 04 22 09 39 4.9 -9 681.10 -56.9 -52.0 -56.9 63 -99 SPO 1997 10 04 22 10 39 4.6 -9 681.10 -56.7 -52.0 -56.8 61 -99 SPO 1997 10 04 22 11 37 4.5 -9 681.10 -56.7 -52.2 -56.8 62 -99 SPO 1997 10 04 22 12 36 4.5 -9 681.10 -56.7 -52.2 -56.8 63 -99 SPO 1997 10 04 22 13 38 4.4 -9 681.10 -56.7 -52.2 -56.8 63 -99 SPO 1997 10 04 22 14 39 4.2 -9 681.10 -56.7 -52.4 -56.7 63 -99 SPO 1997 10 04 22 15 40 4.2 -9 681.10 -56.7 -52.5 -56.7 63 -99 SPO 1997 10 04 22 16 38 4.1 -9 681.10 -56.7 -52.4 -56.7 64 -99 SPO 1997 10 04 22 17 39 4.1 -9 681.10 -56.5 -52.4 -56.6 63 -99 SPO 1997 10 04 22 18 40 4.0 -9 681.10 -56.5 -52.4 -56.6 63 -99 SPO 1997 10 04 22 19 40 4.0 -9 681.10 -56.5 -52.2 -56.6 63 -99 SPO 1997 10 04 22 20 40 4.1 -9 681.10 -56.5 -52.0 -56.5 63 -99 SPO 1997 10 04 22 21 42 4.1 -9 681.10 -56.5 -51.7 -56.6 63 -99 SPO 1997 10 04 22 22 44 3.8 -9 681.10 -56.5 -51.7 -56.6 63 -99 SPO 1997 10 04 22 23 45 3.6 -9 681.10 -56.5 -52.2 -56.5 63 -99 SPO 1997 10 04 22 24 44 3.5 -9 681.10 -56.5 -52.7 -56.6 63 -99 SPO 1997 10 04 22 25 42 3.3 -9 681.10 -56.5 -52.5 -56.5 63 -99 SPO 1997 10 04 22 26 42 3.1 -9 681.10 -56.5 -52.9 -56.5 63 -99 SPO 1997 10 04 22 27 43 3.1 -9 681.10 -56.5 -53.0 -56.5 64 -99 SPO 1997 10 04 22 28 43 3.1 -9 681.10 -56.5 -52.7 -56.4 64 -99 SPO 1997 10 04 22 29 45 3.0 -9 681.10 -56.5 -52.5 -56.4 63 -99 SPO 1997 10 04 22 30 47 3.0 -9 681.10 -56.5 -53.0 -56.4 64 -99 SPO 1997 10 04 22 31 51 2.9 -9 681.10 -56.5 -53.5 -56.5 64 -99 SPO 1997 10 04 22 32 52 2.8 -9 681.10 -56.7 -53.9 -56.5 64 -99 SPO 1997 10 04 22 33 52 2.7 -9 681.10 -56.7 -54.2 -56.6 64 -99 SPO 1997 10 04 22 34 52 2.5 -9 681.10 -56.7 -54.5 -56.6 64 -99 SPO 1997 10 04 22 35 54 2.5 -9 681.10 -56.7 -54.7 -56.6 64 -99 SPO 1997 10 04 22 36 57 2.6 -9 681.10 -56.9 -54.7 -56.6 64 -99 SPO 1997 10 04 22 37 61 2.5 -9 681.10 -57.0 -54.9 -56.6 65 -99 SPO 1997 10 04 22 38 62 2.4 -9 681.10 -57.0 -55.0 -56.7 65 -99 SPO 1997 10 04 22 39 61 2.4 -9 681.10 -57.0 -55.0 -56.7 65 -99 SPO 1997 10 04 22 40 63 2.4 -9 681.10 -57.0 -55.0 -56.7 64 -99 SPO 1997 10 04 22 41 67 2.5 -9 681.10 -57.2 -55.2 -56.7 65 -99 SPO 1997 10 04 22 42 67 2.7 -9 681.10 -57.2 -55.2 -56.8 65 -99 SPO 1997 10 04 22 43 63 2.9 -9 681.10 -57.2 -55.0 -57.0 63 -99 SPO 1997 10 04 22 44 63 3.2 -9 681.00 -57.4 -55.0 -57.1 65 -99 SPO 1997 10 04 22 45 67 3.3 -9 681.00 -57.4 -54.9 -57.2 63 -99 SPO 1997 10 04 22 46 70 3.4 -9 681.00 -57.4 -55.0 -57.2 63 -99 SPO 1997 10 04 22 47 70 3.4 -9 681.10 -57.5 -55.2 -57.2 63 -99 SPO 1997 10 04 22 48 70 3.4 -9 681.10 -57.5 -55.4 -57.3 63 -99 SPO 1997 10 04 22 49 71 3.2 -9 681.10 -57.5 -55.5 -57.4 63 -99 SPO 1997 10 04 22 50 72 3.2 -9 681.10 -57.5 -55.5 -57.4 62 -99 SPO 1997 10 04 22 51 70 3.3 -9 681.10 -57.7 -55.4 -57.5 63 -99 SPO 1997 10 04 22 52 68 3.4 -9 681.10 -57.7 -55.2 -57.5 63 -99 SPO 1997 10 04 22 53 68 3.4 -9 681.10 -57.7 -55.2 -57.5 63 -99 SPO 1997 10 04 22 54 64 3.5 -9 681.10 -57.7 -55.2 -57.6 63 -99 SPO 1997 10 04 22 55 67 3.4 -9 681.10 -57.7 -55.2 -57.6 61 -99 SPO 1997 10 04 22 56 68 3.4 -9 681.10 -57.7 -55.4 -57.6 61 -99 SPO 1997 10 04 22 57 67 3.4 -9 681.10 -57.7 -55.5 -57.6 59 -99 SPO 1997 10 04 22 58 62 3.6 -9 681.10 -57.7 -55.5 -57.6 59 -99 SPO 1997 10 04 22 59 63 3.5 -9 681.10 -57.7 -55.4 -57.6 59 -99 SPO 1997 10 04 23 00 63 3.3 -9 681.10 -57.7 -55.7 -57.6 60 0 SPO 1997 10 04 23 01 64 3.1 -9 681.10 -57.7 -55.7 -57.6 60 -99 SPO 1997 10 04 23 02 69 3.0 -9 681.10 -57.7 -55.9 -57.6 60 -99 SPO 1997 10 04 23 03 71 3.0 -9 681.10 -57.7 -55.9 -57.6 60 -99 SPO 1997 10 04 23 04 70 3.2 -9 681.10 -57.7 -56.0 -57.6 61 -99 SPO 1997 10 04 23 05 70 3.2 -9 681.10 -57.7 -56.0 -57.6 61 -99 SPO 1997 10 04 23 06 72 3.2 -9 681.10 -57.7 -56.2 -57.6 61 -99 SPO 1997 10 04 23 07 73 3.2 -9 681.10 -57.7 -56.2 -57.6 61 -99 SPO 1997 10 04 23 08 72 3.3 -9 681.10 -57.7 -56.2 -57.7 61 -99 SPO 1997 10 04 23 09 70 3.4 -9 681.10 -57.7 -56.4 -57.7 61 -99 SPO 1997 10 04 23 10 67 3.5 -9 681.10 -57.7 -56.4 -57.7 60 -99 SPO 1997 10 04 23 11 67 3.6 -9 681.10 -57.7 -56.2 -57.7 61 -99 SPO 1997 10 04 23 12 66 3.6 -9 681.10 -57.7 -56.2 -57.7 61 -99 SPO 1997 10 04 23 13 68 3.4 -9 681.10 -57.7 -56.4 -57.7 61 -99 SPO 1997 10 04 23 14 68 3.4 -9 681.10 -57.7 -56.7 -57.6 63 -99 SPO 1997 10 04 23 15 69 3.2 -9 681.10 -57.7 -56.7 -57.6 63 -99 SPO 1997 10 04 23 16 69 3.1 -9 681.10 -57.7 -56.7 -57.6 63 -99 SPO 1997 10 04 23 17 66 3.1 -9 681.10 -57.7 -56.5 -57.6 63 -99 SPO 1997 10 04 23 18 67 2.8 -9 681.20 -57.7 -56.5 -57.6 63 -99 SPO 1997 10 04 23 19 70 2.9 -9 681.20 -57.7 -56.5 -57.5 63 -99 SPO 1997 10 04 23 20 70 3.0 -9 681.20 -57.7 -56.5 -57.5 63 -99 SPO 1997 10 04 23 21 69 3.0 -9 681.20 -57.7 -56.5 -57.5 63 -99 SPO 1997 10 04 23 22 71 2.9 -9 681.20 -57.7 -56.4 -57.4 63 -99 SPO 1997 10 04 23 23 76 2.7 -9 681.20 -57.7 -56.4 -57.4 63 -99 SPO 1997 10 04 23 24 78 2.7 -9 681.20 -57.7 -56.5 -57.4 63 -99 SPO 1997 10 04 23 25 77 2.6 -9 681.30 -57.7 -56.7 -57.3 63 -99 SPO 1997 10 04 23 26 78 2.9 -9 681.20 -57.7 -56.5 -57.3 63 -99 SPO 1997 10 04 23 27 78 3.0 -9 681.20 -57.7 -56.5 -57.3 63 -99 SPO 1997 10 04 23 28 75 3.1 -9 681.20 -57.7 -56.7 -57.2 63 -99 SPO 1997 10 04 23 29 77 3.1 -9 681.20 -57.7 -56.5 -57.2 64 -99 SPO 1997 10 04 23 30 77 3.1 -9 681.20 -57.7 -56.5 -57.2 64 -99 SPO 1997 10 04 23 31 76 2.9 -9 681.20 -57.7 -56.5 -57.1 64 -99 SPO 1997 10 04 23 32 73 2.9 -9 681.20 -57.7 -56.5 -57.1 63 -99 SPO 1997 10 04 23 33 69 2.8 -9 681.20 -57.5 -56.5 -57.2 63 -99 SPO 1997 10 04 23 34 71 2.9 -9 681.20 -57.5 -56.5 -57.3 63 -99 SPO 1997 10 04 23 35 67 3.0 -9 681.10 -57.5 -56.5 -57.2 63 -99 SPO 1997 10 04 23 36 68 3.1 -9 681.10 -57.5 -56.4 -57.1 64 -99 SPO 1997 10 04 23 37 66 3.1 -9 681.10 -57.5 -56.4 -57.0 65 -99 SPO 1997 10 04 23 38 66 3.1 -9 681.10 -57.5 -56.4 -56.9 65 -99 SPO 1997 10 04 23 39 64 3.5 -9 681.10 -57.4 -56.4 -56.8 65 -99 SPO 1997 10 04 23 40 63 3.5 -9 681.10 -57.4 -56.0 -56.8 66 -99 SPO 1997 10 04 23 41 63 3.5 -9 681.10 -57.4 -55.7 -56.8 66 -99 SPO 1997 10 04 23 42 64 3.4 -9 681.10 -57.4 -56.0 -56.8 66 -99 SPO 1997 10 04 23 43 64 3.2 -9 681.10 -57.4 -56.2 -56.8 66 -99 SPO 1997 10 04 23 44 66 3.2 -9 681.10 -57.4 -56.5 -56.8 66 -99 SPO 1997 10 04 23 45 67 3.2 -9 681.20 -57.4 -56.7 -56.9 65 -99 SPO 1997 10 04 23 46 66 3.0 -9 681.20 -57.4 -56.5 -57.0 65 -99 SPO 1997 10 04 23 47 65 2.9 -9 681.20 -57.4 -56.7 -57.0 66 -99 SPO 1997 10 04 23 48 67 2.9 -9 681.20 -57.4 -56.5 -56.9 66 -99 SPO 1997 10 04 23 49 64 2.9 -9 681.20 -57.4 -56.2 -56.8 66 -99 SPO 1997 10 04 23 50 60 2.7 -9 681.30 -57.4 -55.9 -56.8 66 -99 SPO 1997 10 04 23 51 63 2.8 -9 681.30 -57.4 -55.2 -56.8 66 -99 SPO 1997 10 04 23 52 67 2.6 -9 681.30 -57.5 -55.5 -56.7 67 -99 SPO 1997 10 04 23 53 72 2.4 -9 681.30 -57.4 -55.9 -56.6 66 -99 SPO 1997 10 04 23 54 78 2.1 -9 681.40 -57.4 -56.0 -56.4 65 -99 SPO 1997 10 04 23 55 79 2.0 -9 681.40 -57.4 -56.0 -56.1 65 -99 SPO 1997 10 04 23 56 83 2.0 -9 681.40 -57.4 -56.2 -56.0 63 -99 SPO 1997 10 04 23 57 85 2.2 -9 681.40 -57.5 -56.2 -56.0 64 -99 SPO 1997 10 04 23 58 85 2.3 -9 681.40 -57.5 -56.4 -56.2 -99 -99 SPO 1997 10 04 23 59 77 2.5 -9 681.30 -57.5 -56.0 -56.4 -99 -99 SPO 1997 10 05 00 00 65 3.0 -9 681.40 -57.5 -55.3 -56.7 -99 0 SPO 1997 10 05 00 01 64 3.0 -9 681.40 -57.5 -55.0 -56.7 -99 -99 SPO 1997 10 05 00 02 67 2.8 -9 681.30 -57.6 -55.4 -56.6 -99 -99 SPO 1997 10 05 00 03 67 2.9 -9 681.30 -57.6 -55.3 -56.4 68 -99 SPO 1997 10 05 00 04 65 3.2 -9 681.20 -57.6 -55.1 -56.4 70 -99 SPO 1997 10 05 00 05 60 3.7 -9 681.20 -57.6 -54.7 -56.4 70 -99 SPO 1997 10 05 00 06 56 4.1 -9 681.10 -57.6 -54.2 -56.5 68 -99 SPO 1997 10 05 00 07 57 4.0 -9 681.10 -57.6 -53.9 -56.5 68 -99 SPO 1997 10 05 00 08 55 4.1 -9 681.10 -57.6 -53.8 -56.5 67 -99 SPO 1997 10 05 00 09 54 4.5 -9 681.00 -57.6 -53.4 -56.6 66 -99 SPO 1997 10 05 00 10 55 4.6 -9 681.00 -57.6 -53.3 -56.7 66 -99 SPO 1997 10 05 00 11 59 4.7 -9 681.00 -57.6 -53.2 -56.7 66 -99 SPO 1997 10 05 00 12 60 4.8 -9 681.00 -57.6 -53.0 -56.7 66 -99 SPO 1997 10 05 00 13 59 4.7 -9 681.00 -57.6 -52.9 -56.7 66 -99 SPO 1997 10 05 00 14 58 4.3 -9 681.10 -57.6 -52.8 -56.6 67 -99 SPO 1997 10 05 00 15 60 4.0 -9 681.10 -57.6 -52.8 -56.6 67 -99 SPO 1997 10 05 00 16 62 4.0 -9 681.10 -57.6 -52.9 -56.6 67 -99 SPO 1997 10 05 00 17 62 4.1 -9 681.10 -57.6 -53.0 -56.6 68 -99 SPO 1997 10 05 00 18 62 3.6 -9 681.20 -57.6 -53.0 -56.6 67 -99 SPO 1997 10 05 00 19 60 3.4 -9 681.20 -57.5 -52.7 -56.6 66 -99 SPO 1997 10 05 00 20 59 3.2 -9 681.20 -57.5 -52.6 -56.5 65 -99 SPO 1997 10 05 00 21 57 3.3 -9 681.10 -57.6 -52.6 -56.4 66 -99 SPO 1997 10 05 00 22 54 3.1 -9 681.10 -57.6 -52.2 -56.4 66 -99 SPO 1997 10 05 00 23 54 3.0 -9 681.20 -57.6 -52.4 -56.4 66 -99 SPO 1997 10 05 00 24 57 2.7 -9 681.20 -57.6 -52.8 -56.6 66 -99 SPO 1997 10 05 00 25 60 2.8 -9 681.20 -57.6 -52.9 -56.8 66 -99 SPO 1997 10 05 00 26 54 3.0 -9 681.20 -57.6 -52.9 -56.9 67 -99 SPO 1997 10 05 00 27 53 3.2 -9 681.10 -57.7 -52.7 -57.0 67 -99 SPO 1997 10 05 00 28 51 3.4 -9 681.10 -57.7 -52.6 -57.0 67 -99 SPO 1997 10 05 00 29 49 3.5 -9 681.10 -57.7 -52.7 -56.9 67 -99 SPO 1997 10 05 00 30 49 3.3 -9 681.10 -57.7 -52.6 -56.8 65 -99 SPO 1997 10 05 00 31 52 2.9 -9 681.10 -57.8 -52.9 -56.6 66 -99 SPO 1997 10 05 00 32 54 2.7 -9 681.20 -57.8 -53.2 -56.6 66 -99 SPO 1997 10 05 00 33 54 2.6 -9 681.20 -57.8 -52.8 -56.6 66 -99 SPO 1997 10 05 00 34 55 2.7 -9 681.20 -57.8 -52.8 -56.6 66 -99 SPO 1997 10 05 00 35 56 2.5 -9 681.20 -57.8 -53.0 -56.6 66 -99 SPO 1997 10 05 00 36 60 2.3 -9 681.20 -57.8 -53.6 -56.4 66 -99 SPO 1997 10 05 00 37 67 2.2 -9 681.20 -57.8 -54.0 -56.3 66 -99 SPO 1997 10 05 00 38 71 2.1 -9 681.20 -57.9 -54.4 -56.2 67 -99 SPO 1997 10 05 00 39 63 2.1 -9 681.20 -58.0 -54.6 -56.1 67 -99 SPO 1997 10 05 00 40 64 2.3 -9 681.20 -58.0 -53.7 -56.2 67 -99 SPO 1997 10 05 00 41 67 2.6 -9 681.20 -58.0 -53.6 -56.6 67 -99 SPO 1997 10 05 00 42 66 2.9 -9 681.20 -58.0 -53.4 -56.9 66 -99 SPO 1997 10 05 00 43 61 3.1 -9 681.10 -58.0 -53.0 -57.2 66 -99 SPO 1997 10 05 00 44 56 3.0 -9 681.10 -57.9 -52.9 -57.3 65 -99 SPO 1997 10 05 00 45 56 3.0 -9 681.10 -57.9 -53.0 -57.4 65 -99 SPO 1997 10 05 00 46 54 3.0 -9 681.10 -57.9 -53.0 -57.2 65 -99 SPO 1997 10 05 00 47 50 3.2 -9 681.10 -57.8 -53.0 -57.1 66 -99 SPO 1997 10 05 00 48 44 3.4 -9 681.10 -57.8 -53.2 -57.0 66 -99 SPO 1997 10 05 00 49 44 3.5 -9 681.10 -57.8 -53.4 -57.0 66 -99 SPO 1997 10 05 00 50 48 3.3 -9 681.10 -57.8 -53.6 -57.0 66 -99 SPO 1997 10 05 00 51 49 3.3 -9 681.10 -57.8 -53.2 -57.1 66 -99 SPO 1997 10 05 00 52 46 3.4 -9 681.10 -57.8 -53.0 -57.2 66 -99 SPO 1997 10 05 00 53 47 3.5 -9 681.10 -57.8 -53.0 -57.2 66 -99 SPO 1997 10 05 00 54 47 3.5 -9 681.10 -57.7 -53.0 -57.2 65 -99 SPO 1997 10 05 00 55 43 3.7 -9 681.00 -57.7 -53.0 -57.2 65 -99 SPO 1997 10 05 00 56 42 3.7 -9 681.00 -57.7 -52.9 -57.2 65 -99 SPO 1997 10 05 00 57 45 3.8 -9 681.00 -57.7 -52.7 -57.2 65 -99 SPO 1997 10 05 00 58 47 3.8 -9 681.00 -57.7 -52.7 -57.2 65 -99 SPO 1997 10 05 00 59 46 3.8 -9 681.00 -57.7 -52.8 -57.3 63 -99 SPO 1997 10 05 01 00 47 3.8 -9 681.00 -57.7 -52.8 -57.3 63 0 SPO 1997 10 05 01 01 49 3.8 -9 681.00 -57.7 -52.8 -57.3 63 -99 SPO 1997 10 05 01 02 52 3.8 -9 681.00 -57.7 -52.9 -57.3 63 -99 SPO 1997 10 05 01 03 56 3.7 -9 681.10 -57.7 -53.0 -57.3 65 -99 SPO 1997 10 05 01 04 56 3.6 -9 681.10 -57.7 -53.3 -57.3 65 -99 SPO 1997 10 05 01 05 49 3.6 -9 681.10 -57.7 -53.3 -57.3 65 -99 SPO 1997 10 05 01 06 45 3.4 -9 681.10 -57.6 -53.2 -57.2 64 -99 SPO 1997 10 05 01 07 49 3.3 -9 681.10 -57.6 -53.1 -57.2 64 -99 SPO 1997 10 05 01 08 53 3.2 -9 681.10 -57.6 -53.2 -57.2 64 -99 SPO 1997 10 05 01 09 57 3.2 -9 681.10 -57.6 -53.5 -57.2 64 -99 SPO 1997 10 05 01 10 55 3.5 -9 681.10 -57.6 -53.3 -57.2 64 -99 SPO 1997 10 05 01 11 51 3.5 -9 681.10 -57.6 -53.3 -57.1 64 -99 SPO 1997 10 05 01 12 49 3.6 -9 681.10 -57.5 -53.2 -57.1 63 -99 SPO 1997 10 05 01 13 51 3.4 -9 681.10 -57.5 -53.6 -57.0 63 -99 SPO 1997 10 05 01 14 52 3.3 -9 681.10 -57.5 -53.6 -57.0 65 -99 SPO 1997 10 05 01 15 52 3.2 -9 681.10 -57.5 -53.5 -56.9 65 -99 SPO 1997 10 05 01 16 50 3.2 -9 681.10 -57.5 -53.6 -56.9 65 -99 SPO 1997 10 05 01 17 48 3.2 -9 681.10 -57.4 -53.7 -56.9 64 -99 SPO 1997 10 05 01 18 47 3.2 -9 681.10 -57.5 -53.6 -57.0 66 -99 SPO 1997 10 05 01 19 44 3.2 -9 681.10 -57.4 -53.5 -57.1 65 -99 SPO 1997 10 05 01 20 47 3.2 -9 681.10 -57.4 -53.5 -57.1 65 -99 SPO 1997 10 05 01 21 49 3.1 -9 681.10 -57.4 -53.5 -57.1 64 -99 SPO 1997 10 05 01 22 50 3.1 -9 681.10 -57.4 -53.6 -57.2 64 -99 SPO 1997 10 05 01 23 48 3.1 -9 681.10 -57.4 -53.7 -57.2 64 -99 SPO 1997 10 05 01 24 44 3.1 -9 681.10 -57.4 -53.6 -57.2 63 -99 SPO 1997 10 05 01 25 41 3.4 -9 681.10 -57.4 -53.4 -57.2 64 -99 SPO 1997 10 05 01 26 41 3.2 -9 681.10 -57.3 -53.4 -57.1 63 -99 SPO 1997 10 05 01 27 42 3.4 -9 681.10 -57.4 -53.4 -57.2 64 -99 SPO 1997 10 05 01 28 46 3.3 -9 681.10 -57.4 -53.5 -57.2 64 -99 SPO 1997 10 05 01 29 47 3.2 -9 681.10 -57.4 -53.5 -57.2 64 -99 SPO 1997 10 05 01 30 44 3.5 -9 681.10 -57.5 -53.6 -57.2 65 -99 SPO 1997 10 05 01 31 41 3.8 -9 681.10 -57.5 -53.6 -57.2 65 -99 SPO 1997 10 05 01 32 37 4.0 -9 681.10 -57.5 -53.6 -57.2 65 -99 SPO 1997 10 05 01 33 34 3.9 -9 681.00 -57.4 -53.6 -57.2 64 -99 SPO 1997 10 05 01 34 34 4.0 -9 681.00 -57.1 -53.6 -57.0 62 -99 SPO 1997 10 05 01 35 37 4.0 -9 681.00 -57.0 -53.6 -56.9 61 -99 SPO 1997 10 05 01 36 37 3.9 -9 681.00 -57.2 -53.7 -57.0 63 -99 SPO 1997 10 05 01 37 34 3.7 -9 681.00 -57.3 -54.0 -57.1 64 -99 SPO 1997 10 05 01 38 31 3.7 -9 681.00 -57.3 -54.1 -57.1 64 -99 SPO 1997 10 05 01 39 31 3.7 -9 681.00 -57.2 -54.0 -57.0 63 -99 SPO 1997 10 05 01 40 33 3.8 -9 681.00 -57.0 -54.0 -56.8 63 -99 SPO 1997 10 05 01 41 35 3.9 -9 681.00 -56.8 -53.9 -56.7 62 -99 SPO 1997 10 05 01 42 37 3.8 -9 681.00 -56.7 -53.8 -56.6 61 -99 SPO 1997 10 05 01 43 38 3.9 -9 680.90 -56.7 -53.8 -56.6 63 -99 SPO 1997 10 05 01 44 37 4.0 -9 680.90 -56.8 -53.9 -56.7 64 -99 SPO 1997 10 05 01 45 36 3.9 -9 680.90 -57.0 -53.9 -56.8 65 -99 SPO 1997 10 05 01 46 36 3.8 -9 680.90 -57.1 -54.0 -56.8 64 -99 SPO 1997 10 05 01 47 38 3.6 -9 680.90 -57.0 -54.2 -56.8 63 -99 SPO 1997 10 05 01 48 41 3.6 -9 680.90 -57.0 -54.4 -56.8 65 -99 SPO 1997 10 05 01 49 43 3.6 -9 680.90 -57.0 -54.5 -56.8 65 -99 SPO 1997 10 05 01 50 43 3.6 -9 680.90 -57.2 -54.6 -57.0 67 -99 SPO 1997 10 05 01 51 45 3.4 -9 680.90 -57.4 -54.6 -57.1 67 -99 SPO 1997 10 05 01 52 46 3.5 -9 680.90 -57.5 -54.7 -57.2 67 -99 SPO 1997 10 05 01 53 47 3.5 -9 680.90 -57.6 -54.8 -57.4 67 -99 SPO 1997 10 05 01 54 47 3.5 -9 680.90 -57.8 -54.8 -57.5 67 -99 SPO 1997 10 05 01 55 47 3.4 -9 680.90 -57.8 -54.8 -57.6 66 -99 SPO 1997 10 05 01 56 46 3.4 -9 680.90 -57.9 -54.8 -57.6 65 -99 SPO 1997 10 05 01 57 45 3.4 -9 680.90 -57.9 -54.8 -57.6 62 -99 SPO 1997 10 05 01 58 45 3.2 -9 680.90 -58.0 -54.8 -57.7 63 -99 SPO 1997 10 05 01 59 47 3.2 -9 680.90 -58.0 -54.8 -57.7 61 -99 SPO 1997 10 05 02 00 47 3.2 -9 680.90 -58.1 -54.9 -57.8 62 0 SPO 1997 10 05 02 01 45 3.2 -9 680.90 -58.1 -54.8 -57.8 62 -99 SPO 1997 10 05 02 02 43 3.1 -9 680.90 -58.2 -54.9 -57.8 62 -99 SPO 1997 10 05 02 03 41 2.9 -9 681.00 -58.2 -54.8 -57.8 62 -99 SPO 1997 10 05 02 04 40 2.8 -9 681.00 -58.2 -54.8 -57.6 62 -99 SPO 1997 10 05 02 05 42 2.7 -9 681.00 -58.2 -54.7 -57.4 62 -99 SPO 1997 10 05 02 06 46 2.6 -9 681.00 -58.2 -54.8 -57.3 62 -99 SPO 1997 10 05 02 07 47 2.6 -9 681.00 -58.2 -54.8 -57.3 62 -99 SPO 1997 10 05 02 08 46 2.7 -9 681.00 -58.2 -54.7 -57.3 62 -99 SPO 1997 10 05 02 09 45 2.8 -9 681.00 -58.2 -54.6 -57.3 61 -99 SPO 1997 10 05 02 10 47 2.7 -9 681.00 -58.2 -54.6 -57.3 61 -99 SPO 1997 10 05 02 11 47 2.7 -9 681.00 -58.2 -54.6 -57.3 62 -99 SPO 1997 10 05 02 12 46 2.7 -9 681.00 -58.3 -54.8 -57.3 63 -99 SPO 1997 10 05 02 13 41 2.8 -9 681.00 -58.3 -54.7 -57.4 64 -99 SPO 1997 10 05 02 14 38 3.0 -9 681.00 -58.3 -54.4 -57.4 64 -99 SPO 1997 10 05 02 15 36 3.0 -9 681.00 -58.4 -54.4 -57.4 64 -99 SPO 1997 10 05 02 16 36 3.1 -9 681.00 -58.4 -54.5 -57.4 64 -99 SPO 1997 10 05 02 17 34 3.1 -9 681.00 -58.4 -54.5 -57.4 64 -99 SPO 1997 10 05 02 18 34 3.1 -9 681.00 -58.4 -54.5 -57.4 65 -99 SPO 1997 10 05 02 19 34 3.2 -9 681.00 -58.5 -54.6 -57.4 66 -99 SPO 1997 10 05 02 20 37 3.0 -9 681.00 -58.5 -54.7 -57.5 66 -99 SPO 1997 10 05 02 21 41 2.9 -9 681.10 -58.5 -54.7 -57.5 65 -99 SPO 1997 10 05 02 22 41 3.0 -9 681.10 -58.5 -54.6 -57.5 65 -99 SPO 1997 10 05 02 23 38 3.1 -9 681.10 -58.5 -54.5 -57.5 65 -99 SPO 1997 10 05 02 24 37 3.1 -9 681.10 -58.5 -54.4 -57.5 65 -99 SPO 1997 10 05 02 25 39 3.2 -9 681.00 -58.5 -54.5 -57.6 65 -99 SPO 1997 10 05 02 26 45 3.0 -9 681.10 -58.6 -54.6 -57.6 66 -99 SPO 1997 10 05 02 27 47 2.8 -9 681.10 -58.8 -54.7 -57.6 67 -99 SPO 1997 10 05 02 28 43 2.8 -9 681.10 -58.8 -54.4 -57.7 65 -99 SPO 1997 10 05 02 29 36 2.9 -9 681.10 -58.7 -54.1 -57.7 65 -99 SPO 1997 10 05 02 30 35 2.8 -9 681.10 -58.6 -54.0 -57.7 64 -99 SPO 1997 10 05 02 31 36 2.7 -9 681.10 -58.7 -54.0 -57.7 65 -99 SPO 1997 10 05 02 32 36 2.8 -9 681.10 -58.8 -54.2 -57.7 65 -99 SPO 1997 10 05 02 33 34 2.9 -9 681.10 -58.8 -54.3 -57.8 64 -99 SPO 1997 10 05 02 34 34 3.0 -9 681.00 -58.9 -54.0 -57.8 65 -99 SPO 1997 10 05 02 35 32 3.1 -9 681.00 -58.9 -53.8 -57.8 64 -99 SPO 1997 10 05 02 36 29 3.3 -9 681.00 -58.8 -53.7 -57.8 63 -99 SPO 1997 10 05 02 37 28 3.5 -9 681.00 -58.8 -53.7 -57.8 63 -99 SPO 1997 10 05 02 38 27 3.4 -9 681.00 -58.8 -53.7 -57.8 64 -99 SPO 1997 10 05 02 39 27 3.4 -9 681.00 -58.7 -53.6 -57.8 63 -99 SPO 1997 10 05 02 40 28 3.4 -9 681.00 -58.8 -53.6 -57.8 64 -99 SPO 1997 10 05 02 41 28 3.2 -9 681.00 -58.8 -53.6 -57.9 64 -99 SPO 1997 10 05 02 42 28 3.2 -9 681.10 -58.8 -53.7 -58.0 64 -99 SPO 1997 10 05 02 43 30 3.2 -9 681.10 -58.8 -53.7 -58.0 64 -99 SPO 1997 10 05 02 44 32 3.1 -9 681.10 -58.8 -53.6 -57.9 63 -99 SPO 1997 10 05 02 45 33 3.0 -9 681.10 -58.8 -53.7 -57.8 63 -99 SPO 1997 10 05 02 46 32 2.9 -9 681.10 -58.8 -53.8 -57.8 63 -99 SPO 1997 10 05 02 47 31 2.7 -9 681.10 -58.9 -53.8 -57.8 62 -99 SPO 1997 10 05 02 48 32 2.6 -9 681.10 -58.8 -53.8 -57.7 61 -99 SPO 1997 10 05 02 49 34 2.6 -9 681.10 -58.9 -53.8 -57.8 62 -99 SPO 1997 10 05 02 50 37 2.7 -9 681.10 -59.0 -53.8 -57.8 63 -99 SPO 1997 10 05 02 51 37 2.7 -9 681.10 -59.0 -53.8 -57.9 63 -99 SPO 1997 10 05 02 52 39 2.6 -9 681.10 -59.0 -53.8 -58.0 63 -99 SPO 1997 10 05 02 53 38 2.6 -9 681.10 -59.1 -53.8 -58.0 64 -99 SPO 1997 10 05 02 54 36 2.6 -9 681.10 -59.1 -53.8 -57.9 65 -99 SPO 1997 10 05 02 55 36 2.4 -9 681.10 -59.0 -53.9 -57.8 65 -99 SPO 1997 10 05 02 56 34 2.4 -9 681.10 -59.0 -54.0 -57.8 63 -99 SPO 1997 10 05 02 57 31 2.4 -9 681.10 -59.0 -54.0 -57.8 63 -99 SPO 1997 10 05 02 58 27 2.5 -9 681.10 -59.0 -54.1 -57.8 63 -99 SPO 1997 10 05 02 59 26 2.6 -9 681.10 -59.0 -54.1 -58.0 63 -99 SPO 1997 10 05 03 00 25 2.5 -9 681.10 -58.8 -54.1 -57.9 61 0 SPO 1997 10 05 03 01 25 2.5 -9 681.10 -58.9 -54.2 -57.9 62 -99 SPO 1997 10 05 03 02 25 2.5 -9 681.10 -59.0 -54.2 -58.0 65 -99 SPO 1997 10 05 03 03 25 2.3 -9 681.10 -59.0 -54.3 -58.1 65 -99 SPO 1997 10 05 03 04 28 2.3 -9 681.10 -59.0 -54.3 -58.1 65 -99 SPO 1997 10 05 03 05 29 2.4 -9 681.10 -59.0 -54.3 -58.1 65 -99 SPO 1997 10 05 03 06 29 2.6 -9 681.10 -59.0 -54.3 -58.1 65 -99 SPO 1997 10 05 03 07 30 2.7 -9 681.10 -59.0 -54.3 -58.1 65 -99 SPO 1997 10 05 03 08 31 2.5 -9 681.10 -59.0 -54.3 -58.2 65 -99 SPO 1997 10 05 03 09 31 2.6 -9 681.10 -59.1 -54.3 -58.2 64 -99 SPO 1997 10 05 03 10 30 2.6 -9 681.00 -59.0 -54.3 -58.1 63 -99 SPO 1997 10 05 03 11 29 2.8 -9 681.00 -58.9 -54.3 -58.2 62 -99 SPO 1997 10 05 03 12 28 2.6 -9 681.00 -58.8 -54.3 -58.2 61 -99 SPO 1997 10 05 03 13 25 2.9 -9 681.00 -58.7 -54.3 -58.1 62 -99 SPO 1997 10 05 03 14 23 3.2 -9 680.90 -58.8 -54.3 -58.1 63 -99 SPO 1997 10 05 03 15 23 3.2 -9 680.90 -58.8 -54.4 -58.1 63 -99 SPO 1997 10 05 03 16 23 3.4 -9 680.90 -58.8 -54.4 -58.1 64 -99 SPO 1997 10 05 03 17 24 3.4 -9 680.90 -58.8 -54.4 -58.1 64 -99 SPO 1997 10 05 03 18 24 3.5 -9 680.90 -58.9 -54.4 -58.2 66 -99 SPO 1997 10 05 03 19 25 3.4 -9 680.90 -58.8 -54.4 -58.1 65 -99 SPO 1997 10 05 03 20 24 3.5 -9 680.90 -58.8 -54.4 -58.1 65 -99 SPO 1997 10 05 03 21 23 3.4 -9 680.90 -58.7 -54.4 -58.0 65 -99 SPO 1997 10 05 03 22 26 3.5 -9 680.80 -58.6 -54.4 -58.0 62 -99 SPO 1997 10 05 03 23 27 3.6 -9 680.80 -58.6 -54.4 -57.9 64 -99 SPO 1997 10 05 03 24 28 3.6 -9 680.80 -58.5 -54.4 -57.9 63 -99 SPO 1997 10 05 03 25 30 3.5 -9 680.80 -58.4 -54.4 -57.9 62 -99 SPO 1997 10 05 03 26 28 3.7 -9 680.80 -58.3 -54.4 -57.8 63 -99 SPO 1997 10 05 03 27 29 3.7 -9 680.80 -58.2 -54.4 -57.8 62 -99 SPO 1997 10 05 03 28 30 3.8 -9 680.80 -58.1 -54.4 -57.7 62 -99 SPO 1997 10 05 03 29 32 3.9 -9 680.80 -58.0 -54.4 -57.7 62 -99 SPO 1997 10 05 03 30 32 4.0 -9 680.80 -58.0 -54.4 -57.6 63 -99 SPO 1997 10 05 03 31 31 3.9 -9 680.70 -58.0 -54.4 -57.6 63 -99 SPO 1997 10 05 03 32 30 4.0 -9 680.70 -58.0 -54.4 -57.6 65 -99 SPO 1997 10 05 03 33 30 3.5 -9 680.80 -57.8 -54.4 -57.5 63 -99 SPO 1997 10 05 03 34 31 3.3 -9 680.80 -57.8 -54.4 -57.4 64 -99 SPO 1997 10 05 03 35 30 3.0 -9 680.80 -57.8 -54.4 -57.4 64 -99 SPO 1997 10 05 03 36 27 3.2 -9 680.80 -57.8 -54.4 -57.3 64 -99 SPO 1997 10 05 03 37 22 2.8 -9 680.80 -57.8 -54.4 -57.3 66 -99 SPO 1997 10 05 03 38 18 2.7 -9 680.80 -57.7 -54.3 -57.2 65 -99 SPO 1997 10 05 03 39 17 2.6 -9 680.90 -57.5 -54.2 -57.0 63 -99 SPO 1997 10 05 03 40 17 2.6 -9 680.90 -57.4 -54.2 -56.9 64 -99 SPO 1997 10 05 03 41 18 2.6 -9 680.90 -57.2 -54.3 -56.8 63 -99 SPO 1997 10 05 03 42 16 2.6 -9 680.80 -57.0 -54.3 -56.6 62 -99 SPO 1997 10 05 03 43 18 2.6 -9 680.80 -57.0 -54.3 -56.6 63 -99 SPO 1997 10 05 03 44 20 2.6 -9 680.80 -57.0 -54.3 -56.6 63 -99 SPO 1997 10 05 03 45 21 2.6 -9 680.80 -57.2 -54.3 -56.7 65 -99 SPO 1997 10 05 03 46 22 2.6 -9 680.80 -57.3 -54.4 -56.8 67 -99 SPO 1997 10 05 03 47 24 2.7 -9 680.80 -57.4 -54.4 -56.8 67 -99 SPO 1997 10 05 03 48 26 2.6 -9 680.80 -57.6 -54.4 -56.9 68 -99 SPO 1997 10 05 03 49 29 2.6 -9 680.80 -57.7 -54.5 -57.0 69 -99 SPO 1997 10 05 03 50 32 2.5 -9 680.80 -57.9 -54.5 -57.0 71 -99 SPO 1997 10 05 03 51 35 2.5 -9 680.90 -58.1 -54.6 -57.2 71 -99 SPO 1997 10 05 03 52 35 2.5 -9 680.90 -58.2 -54.6 -57.3 71 -99 SPO 1997 10 05 03 53 35 2.5 -9 680.90 -58.3 -54.5 -57.4 70 -99 SPO 1997 10 05 03 54 34 2.6 -9 680.90 -58.4 -54.5 -57.6 69 -99 SPO 1997 10 05 03 55 36 2.7 -9 680.90 -58.4 -54.5 -57.7 68 -99 SPO 1997 10 05 03 56 35 3.0 -9 680.80 -58.5 -54.4 -57.9 67 -99 SPO 1997 10 05 03 57 39 2.8 -9 680.80 -58.5 -54.4 -58.0 65 -99 SPO 1997 10 05 03 58 48 2.7 -9 680.80 -58.4 -54.4 -58.0 62 -99 SPO 1997 10 05 03 59 49 2.8 -9 680.80 -58.5 -54.5 -58.0 62 -99 SPO 1997 10 05 04 00 48 2.7 -9 680.90 -58.6 -54.5 -58.1 62 0 SPO 1997 10 05 04 01 47 2.8 -9 680.90 -58.6 -54.5 -58.2 62 -99 SPO 1997 10 05 04 02 48 2.8 -9 680.90 -58.7 -54.5 -58.2 63 -99 SPO 1997 10 05 04 03 45 2.9 -9 680.90 -58.7 -54.5 -58.2 63 -99 SPO 1997 10 05 04 04 44 3.1 -9 680.90 -58.7 -54.4 -58.3 62 -99 SPO 1997 10 05 04 05 43 3.3 -9 680.90 -58.7 -54.3 -58.4 62 -99 SPO 1997 10 05 04 06 46 3.3 -9 680.90 -58.7 -54.3 -58.4 62 -99 SPO 1997 10 05 04 07 51 3.2 -9 680.90 -58.8 -54.3 -58.5 63 -99 SPO 1997 10 05 04 08 48 3.2 -9 680.90 -58.8 -54.3 -58.5 63 -99 SPO 1997 10 05 04 09 44 3.1 -9 680.90 -58.8 -54.3 -58.5 61 -99 SPO 1997 10 05 04 10 50 3.1 -9 680.90 -58.8 -54.3 -58.5 61 -99 SPO 1997 10 05 04 11 53 3.0 -9 680.90 -58.8 -54.4 -58.5 61 -99 SPO 1997 10 05 04 12 48 3.0 -9 680.90 -58.8 -54.4 -58.5 60 -99 SPO 1997 10 05 04 13 53 3.1 -9 680.90 -58.7 -54.3 -58.5 61 -99 SPO 1997 10 05 04 14 54 3.2 -9 680.90 -58.7 -54.3 -58.5 61 -99 SPO 1997 10 05 04 15 51 3.3 -9 680.90 -58.6 -54.4 -58.5 60 -99 SPO 1997 10 05 04 16 49 3.3 -9 680.90 -58.6 -54.4 -58.4 62 -99 SPO 1997 10 05 04 17 48 3.3 -9 680.90 -58.6 -54.4 -58.4 62 -99 SPO 1997 10 05 04 18 49 3.3 -9 680.90 -58.5 -54.3 -58.4 61 -99 SPO 1997 10 05 04 19 51 3.2 -9 680.90 -58.5 -54.4 -58.3 61 -99 SPO 1997 10 05 04 20 49 3.3 -9 680.90 -58.4 -54.4 -58.3 60 -99 SPO 1997 10 05 04 21 48 3.4 -9 680.90 -58.4 -54.3 -58.3 60 -99 SPO 1997 10 05 04 22 47 3.4 -9 680.90 -58.4 -54.3 -58.3 60 -99 SPO 1997 10 05 04 23 47 3.5 -9 680.90 -58.3 -54.4 -58.2 59 -99 SPO 1997 10 05 04 24 45 3.5 -9 680.90 -58.2 -54.4 -58.2 59 -99 SPO 1997 10 05 04 25 42 3.6 -9 680.90 -58.1 -54.3 -58.1 60 -99 SPO 1997 10 05 04 26 40 3.7 -9 680.90 -58.1 -54.2 -58.0 60 -99 SPO 1997 10 05 04 27 39 3.8 -9 680.90 -58.0 -54.1 -58.0 61 -99 SPO 1997 10 05 04 28 39 3.9 -9 680.90 -57.9 -54.1 -57.9 60 -99 SPO 1997 10 05 04 29 38 3.9 -9 680.90 -57.8 -54.1 -57.8 60 -99 SPO 1997 10 05 04 30 39 3.8 -9 680.90 -57.7 -54.1 -57.7 61 -99 SPO 1997 10 05 04 31 39 3.7 -9 680.90 -57.6 -54.1 -57.6 62 -99 SPO 1997 10 05 04 32 40 3.6 -9 680.90 -57.5 -54.1 -57.5 62 -99 SPO 1997 10 05 04 33 39 3.8 -9 680.90 -57.4 -54.0 -57.5 63 -99 SPO 1997 10 05 04 34 40 3.7 -9 680.90 -57.4 -54.0 -57.4 63 -99 SPO 1997 10 05 04 35 41 3.7 -9 680.80 -57.3 -53.9 -57.3 63 -99 SPO 1997 10 05 04 36 40 3.6 -9 680.80 -57.2 -53.8 -57.2 63 -99 SPO 1997 10 05 04 37 39 3.6 -9 680.90 -57.2 -53.8 -57.2 63 -99 SPO 1997 10 05 04 38 37 3.6 -9 680.90 -57.1 -53.8 -57.1 63 -99 SPO 1997 10 05 04 39 38 3.5 -9 680.90 -57.0 -53.7 -57.0 63 -99 SPO 1997 10 05 04 40 38 3.4 -9 680.90 -56.8 -53.7 -56.9 62 -99 SPO 1997 10 05 04 41 37 3.5 -9 680.80 -56.8 -53.7 -56.8 64 -99 SPO 1997 10 05 04 42 36 3.6 -9 680.80 -56.6 -53.8 -56.8 62 -99 SPO 1997 10 05 04 43 36 3.5 -9 680.80 -56.6 -53.9 -56.7 63 -99 SPO 1997 10 05 04 44 35 3.6 -9 680.80 -56.5 -53.8 -56.6 64 -99 SPO 1997 10 05 04 45 33 3.7 -9 680.80 -56.3 -53.8 -56.4 62 -99 SPO 1997 10 05 04 46 33 3.7 -9 680.80 -56.2 -54.0 -56.3 63 -99 SPO 1997 10 05 04 47 33 3.9 -9 680.80 -56.0 -53.9 -56.1 62 -99 SPO 1997 10 05 04 48 34 3.9 -9 680.70 -55.9 -53.7 -56.0 63 -99 SPO 1997 10 05 04 49 33 4.1 -9 680.70 -55.8 -53.7 -55.9 64 -99 SPO 1997 10 05 04 50 32 4.0 -9 680.70 -55.6 -53.7 -55.8 62 -99 SPO 1997 10 05 04 51 31 4.0 -9 680.80 -55.5 -53.6 -55.7 64 -99 SPO 1997 10 05 04 52 31 3.9 -9 680.80 -55.4 -53.6 -55.6 65 -99 SPO 1997 10 05 04 53 30 3.9 -9 680.80 -55.4 -53.7 -55.5 65 -99 SPO 1997 10 05 04 54 29 4.0 -9 680.70 -55.2 -53.6 -55.4 64 -99 SPO 1997 10 05 04 55 29 4.0 -9 680.70 -55.1 -53.5 -55.3 65 -99 SPO 1997 10 05 04 56 29 4.1 -9 680.70 -55.0 -53.5 -55.2 64 -99 SPO 1997 10 05 04 57 29 4.2 -9 680.70 -55.0 -53.6 -55.1 64 -99 SPO 1997 10 05 04 58 30 4.1 -9 680.60 -54.9 -53.7 -55.0 63 -99 SPO 1997 10 05 04 59 28 4.2 -9 680.60 -54.9 -53.8 -55.0 65 -99 SPO 1997 10 05 05 00 27 4.3 -9 680.60 -54.8 -53.8 -54.9 64 0 SPO 1997 10 05 05 01 26 4.3 -9 680.60 -54.8 -53.7 -54.9 65 -99 SPO 1997 10 05 05 02 23 4.5 -9 680.60 -54.7 -53.5 -54.8 66 -99 SPO 1997 10 05 05 03 23 4.3 -9 680.60 -54.6 -53.3 -54.7 66 -99 SPO 1997 10 05 05 04 22 4.2 -9 680.60 -54.6 -53.2 -54.6 66 -99 SPO 1997 10 05 05 05 22 4.2 -9 680.60 -54.5 -53.4 -54.6 66 -99 SPO 1997 10 05 05 06 20 4.4 -9 680.60 -54.4 -53.4 -54.5 67 -99 SPO 1997 10 05 05 07 19 4.5 -9 680.60 -54.4 -53.2 -54.5 67 -99 SPO 1997 10 05 05 08 18 4.6 -9 680.50 -54.4 -53.2 -54.4 67 -99 SPO 1997 10 05 05 09 18 4.4 -9 680.50 -54.3 -53.2 -54.4 67 -99 SPO 1997 10 05 05 10 18 4.4 -9 680.50 -54.2 -53.2 -54.3 66 -99 SPO 1997 10 05 05 11 18 4.3 -9 680.50 -54.2 -53.2 -54.3 66 -99 SPO 1997 10 05 05 12 17 4.3 -9 680.50 -54.2 -53.4 -54.2 66 -99 SPO 1997 10 05 05 13 16 4.1 -9 680.50 -54.2 -53.6 -54.2 66 -99 SPO 1997 10 05 05 14 15 4.3 -9 680.50 -54.2 -53.7 -54.2 67 -99 SPO 1997 10 05 05 15 15 3.9 -9 680.50 -54.2 -53.7 -54.2 67 -99 SPO 1997 10 05 05 16 16 4.1 -9 680.50 -54.2 -53.6 -54.2 67 -99 SPO 1997 10 05 05 17 16 4.1 -9 680.50 -54.2 -53.5 -54.2 68 -99 SPO 1997 10 05 05 18 15 4.2 -9 680.50 -54.2 -53.7 -54.2 68 -99 SPO 1997 10 05 05 19 14 4.3 -9 680.50 -54.1 -53.7 -54.1 67 -99 SPO 1997 10 05 05 20 13 4.0 -9 680.50 -54.1 -53.7 -54.1 67 -99 SPO 1997 10 05 05 21 13 4.0 -9 680.50 -54.1 -53.8 -54.1 67 -99 SPO 1997 10 05 05 22 13 3.9 -9 680.50 -54.0 -53.8 -54.0 66 -99 SPO 1997 10 05 05 23 12 3.8 -9 680.50 -54.0 -53.9 -54.0 66 -99 SPO 1997 10 05 05 24 12 4.0 -9 680.50 -54.0 -53.8 -54.0 66 -99 SPO 1997 10 05 05 25 11 4.0 -9 680.50 -54.0 -53.8 -54.0 66 -99 SPO 1997 10 05 05 26 11 3.7 -9 680.50 -54.0 -53.9 -54.0 67 -99 SPO 1997 10 05 05 27 9 3.7 -9 680.50 -54.0 -54.0 -54.0 67 -99 SPO 1997 10 05 05 28 9 3.5 -9 680.50 -54.0 -54.0 -53.9 67 -99 SPO 1997 10 05 05 29 8 3.6 -9 680.50 -53.9 -54.0 -53.9 66 -99 SPO 1997 10 05 05 30 7 3.9 -9 680.50 -53.9 -54.1 -53.9 66 -99 SPO 1997 10 05 05 31 6 3.6 -9 680.50 -53.9 -54.1 -53.9 66 -99 SPO 1997 10 05 05 32 6 3.4 -9 680.50 -53.9 -54.1 -53.9 66 -99 SPO 1997 10 05 05 33 9 3.2 -9 680.50 -53.9 -54.1 -53.9 65 -99 SPO 1997 10 05 05 34 9 3.1 -9 680.60 -53.9 -54.1 -53.8 65 -99 SPO 1997 10 05 05 35 8 3.2 -9 680.60 -53.9 -54.1 -53.8 65 -99 SPO 1997 10 05 05 36 7 3.5 -9 680.60 -53.9 -54.1 -53.8 66 -99 SPO 1997 10 05 05 37 6 3.3 -9 680.60 -53.9 -54.1 -53.8 66 -99 SPO 1997 10 05 05 38 5 3.2 -9 680.60 -53.9 -54.0 -53.8 66 -99 SPO 1997 10 05 05 39 6 3.3 -9 680.60 -53.9 -54.0 -53.8 66 -99 SPO 1997 10 05 05 40 9 3.5 -9 680.60 -53.9 -54.0 -53.8 67 -99 SPO 1997 10 05 05 41 10 3.4 -9 680.60 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 05 42 10 3.5 -9 680.60 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 05 43 10 3.7 -9 680.60 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 05 44 11 3.6 -9 680.60 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 05 45 13 3.5 -9 680.60 -53.9 -54.2 -53.8 67 -99 SPO 1997 10 05 05 46 13 3.5 -9 680.60 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 05 47 12 3.8 -9 680.60 -53.9 -54.2 -53.8 67 -99 SPO 1997 10 05 05 48 12 3.7 -9 680.60 -53.9 -54.2 -53.8 67 -99 SPO 1997 10 05 05 49 14 4.0 -9 680.60 -53.8 -54.2 -53.8 67 -99 SPO 1997 10 05 05 50 12 4.1 -9 680.60 -53.9 -54.2 -53.8 67 -99 SPO 1997 10 05 05 51 11 3.7 -9 680.60 -53.9 -54.2 -53.9 67 -99 SPO 1997 10 05 05 52 13 3.4 -9 680.60 -53.9 -54.1 -53.8 67 -99 SPO 1997 10 05 05 53 11 3.8 -9 680.60 -53.9 -54.2 -53.8 67 -99 SPO 1997 10 05 05 54 11 3.5 -9 680.60 -54.0 -54.2 -53.9 68 -99 SPO 1997 10 05 05 55 10 3.7 -9 680.60 -53.9 -54.2 -53.9 65 -99 SPO 1997 10 05 05 56 7 3.7 -9 680.60 -54.0 -54.2 -53.9 66 -99 SPO 1997 10 05 05 57 8 3.5 -9 680.60 -53.9 -54.2 -53.9 65 -99 SPO 1997 10 05 05 58 8 3.6 -9 680.60 -53.9 -54.2 -53.9 65 -99 SPO 1997 10 05 05 59 6 3.3 -9 680.60 -53.9 -54.2 -53.8 65 -99 SPO 1997 10 05 06 00 5 3.5 -9 680.50 -53.9 -54.2 -53.8 65 0 SPO 1997 10 05 06 01 4 3.6 -9 680.60 -53.9 -54.2 -53.9 65 -99 SPO 1997 10 05 06 02 4 3.7 -9 680.60 -54.0 -54.3 -53.9 67 -99 SPO 1997 10 05 06 03 3 3.4 -9 680.60 -54.0 -54.3 -53.9 67 -99 SPO 1997 10 05 06 04 4 3.6 -9 680.60 -54.0 -54.3 -53.9 67 -99 SPO 1997 10 05 06 05 5 3.5 -9 680.50 -54.0 -54.3 -53.9 67 -99 SPO 1997 10 05 06 06 5 3.5 -9 680.50 -54.0 -54.3 -53.9 67 -99 SPO 1997 10 05 06 07 6 3.3 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 08 7 3.3 -9 680.50 -54.0 -54.2 -53.9 66 -99 SPO 1997 10 05 06 09 8 3.3 -9 680.50 -54.0 -54.2 -53.9 66 -99 SPO 1997 10 05 06 10 7 3.5 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 11 5 3.6 -9 680.50 -54.1 -54.3 -54.0 67 -99 SPO 1997 10 05 06 12 2 3.3 -9 680.50 -54.0 -54.3 -54.0 66 -99 SPO 1997 10 05 06 13 2 3.2 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 14 2 3.4 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 15 5 3.6 -9 680.40 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 16 5 3.7 -9 680.40 -54.1 -54.4 -54.0 67 -99 SPO 1997 10 05 06 17 8 3.4 -9 680.50 -54.1 -54.4 -54.0 67 -99 SPO 1997 10 05 06 18 8 3.4 -9 680.50 -54.1 -54.4 -54.0 67 -99 SPO 1997 10 05 06 19 10 3.2 -9 680.50 -54.1 -54.3 -54.0 67 -99 SPO 1997 10 05 06 20 12 3.5 -9 680.50 -54.1 -54.3 -54.0 65 -99 SPO 1997 10 05 06 21 12 3.4 -9 680.50 -54.1 -54.3 -53.9 65 -99 SPO 1997 10 05 06 22 13 3.1 -9 680.50 -54.1 -54.3 -54.0 65 -99 SPO 1997 10 05 06 23 15 3.1 -9 680.50 -54.1 -54.3 -53.9 65 -99 SPO 1997 10 05 06 24 16 3.2 -9 680.50 -54.1 -54.4 -54.0 67 -99 SPO 1997 10 05 06 25 18 3.1 -9 680.60 -54.1 -54.4 -54.0 65 -99 SPO 1997 10 05 06 26 19 3.1 -9 680.60 -54.1 -54.4 -53.9 65 -99 SPO 1997 10 05 06 27 23 3.0 -9 680.60 -54.1 -54.4 -53.9 65 -99 SPO 1997 10 05 06 28 26 3.3 -9 680.60 -54.0 -54.4 -53.9 64 -99 SPO 1997 10 05 06 29 24 3.6 -9 680.60 -54.1 -54.4 -54.0 67 -99 SPO 1997 10 05 06 30 25 3.6 -9 680.60 -54.1 -54.4 -53.9 67 -99 SPO 1997 10 05 06 31 24 3.4 -9 680.60 -54.1 -54.4 -53.9 65 -99 SPO 1997 10 05 06 32 24 3.8 -9 680.50 -54.0 -54.4 -53.9 64 -99 SPO 1997 10 05 06 33 23 3.6 -9 680.50 -54.0 -54.4 -53.9 66 -99 SPO 1997 10 05 06 34 23 3.6 -9 680.50 -54.0 -54.4 -53.9 66 -99 SPO 1997 10 05 06 35 21 3.9 -9 680.50 -54.0 -54.4 -53.9 66 -99 SPO 1997 10 05 06 36 22 3.8 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 37 21 3.7 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 38 23 3.8 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 39 25 3.8 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 40 24 3.7 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 41 25 3.6 -9 680.50 -54.0 -54.3 -53.9 66 -99 SPO 1997 10 05 06 42 22 3.3 -9 680.50 -54.0 -54.3 -53.8 66 -99 SPO 1997 10 05 06 43 23 3.3 -9 680.50 -53.9 -54.3 -53.8 65 -99 SPO 1997 10 05 06 44 22 3.5 -9 680.50 -53.9 -54.3 -53.8 65 -99 SPO 1997 10 05 06 45 22 3.8 -9 680.40 -53.9 -54.2 -53.8 65 -99 SPO 1997 10 05 06 46 24 3.6 -9 680.50 -53.9 -54.2 -53.8 65 -99 SPO 1997 10 05 06 47 23 3.4 -9 680.40 -53.9 -54.2 -53.7 65 -99 SPO 1997 10 05 06 48 22 3.6 -9 680.40 -53.8 -54.1 -53.7 65 -99 SPO 1997 10 05 06 49 20 3.5 -9 680.40 -53.8 -54.1 -53.6 65 -99 SPO 1997 10 05 06 50 20 3.5 -9 680.40 -53.8 -54.1 -53.6 65 -99 SPO 1997 10 05 06 51 21 3.5 -9 680.40 -53.8 -54.1 -53.6 67 -99 SPO 1997 10 05 06 52 23 3.5 -9 680.40 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 06 53 22 3.7 -9 680.40 -53.8 -54.0 -53.6 68 -99 SPO 1997 10 05 06 54 23 3.3 -9 680.40 -53.8 -54.0 -53.6 68 -99 SPO 1997 10 05 06 55 23 3.4 -9 680.40 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 06 56 21 3.3 -9 680.40 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 06 57 17 3.2 -9 680.40 -53.7 -54.0 -53.6 66 -99 SPO 1997 10 05 06 58 17 3.3 -9 680.40 -53.7 -54.0 -53.5 66 -99 SPO 1997 10 05 06 59 12 3.4 -9 680.40 -53.8 -54.0 -53.5 67 -99 SPO 1997 10 05 07 00 15 3.6 -9 680.40 -53.7 -54.0 -53.5 66 0 SPO 1997 10 05 07 01 16 3.6 -9 680.40 -53.8 -54.0 -53.5 67 -99 SPO 1997 10 05 07 02 15 3.5 -9 680.40 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 03 17 3.0 -9 680.40 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 04 14 3.2 -9 680.50 -53.7 -54.0 -53.5 67 -99 SPO 1997 10 05 07 05 15 3.3 -9 680.50 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 06 15 3.2 -9 680.50 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 07 14 3.3 -9 680.50 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 08 19 3.0 -9 680.50 -53.8 -54.0 -53.5 67 -99 SPO 1997 10 05 07 09 24 3.0 -9 680.50 -53.8 -54.0 -53.5 67 -99 SPO 1997 10 05 07 10 23 2.9 -9 680.50 -53.7 -54.0 -53.5 64 -99 SPO 1997 10 05 07 11 23 2.9 -9 680.50 -53.7 -53.9 -53.5 62 -99 SPO 1997 10 05 07 12 19 3.0 -9 680.50 -53.7 -54.0 -53.4 64 -99 SPO 1997 10 05 07 13 15 3.3 -9 680.50 -53.7 -54.0 -53.5 66 -99 SPO 1997 10 05 07 14 10 3.4 -9 680.40 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 15 7 3.0 -9 680.50 -53.8 -54.0 -53.5 68 -99 SPO 1997 10 05 07 16 9 2.8 -9 680.50 -53.7 -54.0 -53.5 70 -99 SPO 1997 10 05 07 17 10 2.9 -9 680.50 -53.7 -54.0 -53.5 70 -99 SPO 1997 10 05 07 18 13 2.7 -9 680.50 -53.7 -54.0 -53.5 70 -99 SPO 1997 10 05 07 19 9 2.6 -9 680.50 -53.7 -54.0 -53.5 68 -99 SPO 1997 10 05 07 20 8 3.1 -9 680.50 -53.7 -54.0 -53.5 67 -99 SPO 1997 10 05 07 21 5 3.0 -9 680.50 -53.7 -54.0 -53.5 66 -99 SPO 1997 10 05 07 22 359 3.4 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 23 4 3.0 -9 680.40 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 24 9 3.1 -9 680.40 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 25 11 3.2 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 26 8 3.2 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 27 8 3.0 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 28 6 3.1 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 29 6 3.2 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 30 10 2.8 -9 680.50 -53.8 -54.0 -53.6 67 -99 SPO 1997 10 05 07 31 10 3.3 -9 680.50 -53.9 -54.1 -53.6 66 -99 SPO 1997 10 05 07 32 14 3.2 -9 680.50 -54.0 -54.1 -53.7 67 -99 SPO 1997 10 05 07 33 17 3.4 -9 680.50 -54.0 -54.1 -53.7 66 -99 SPO 1997 10 05 07 34 20 3.4 -9 680.50 -54.0 -54.1 -53.8 66 -99 SPO 1997 10 05 07 35 19 3.6 -9 680.50 -54.0 -54.1 -53.8 66 -99 SPO 1997 10 05 07 36 23 3.5 -9 680.50 -54.0 -54.1 -53.8 66 -99 SPO 1997 10 05 07 37 19 3.7 -9 680.50 -54.0 -54.1 -53.8 66 -99 SPO 1997 10 05 07 38 22 3.2 -9 680.50 -54.1 -54.1 -53.8 67 -99 SPO 1997 10 05 07 39 19 3.4 -9 680.50 -54.1 -54.1 -53.8 67 -99 SPO 1997 10 05 07 40 21 3.2 -9 680.50 -54.2 -54.1 -53.8 67 -99 SPO 1997 10 05 07 41 21 3.2 -9 680.50 -54.2 -54.2 -53.8 66 -99 SPO 1997 10 05 07 42 20 3.2 -9 680.50 -54.2 -54.2 -53.8 66 -99 SPO 1997 10 05 07 43 16 3.6 -9 680.50 -54.2 -54.2 -53.8 64 -99 SPO 1997 10 05 07 44 14 3.8 -9 680.50 -54.2 -54.2 -53.9 64 -99 SPO 1997 10 05 07 45 18 3.5 -9 680.50 -54.3 -54.3 -53.9 64 -99 SPO 1997 10 05 07 46 21 3.4 -9 680.50 -54.3 -54.3 -54.0 64 -99 SPO 1997 10 05 07 47 17 3.8 -9 680.50 -54.3 -54.3 -53.9 64 -99 SPO 1997 10 05 07 48 15 3.6 -9 680.50 -54.3 -54.3 -53.9 64 -99 SPO 1997 10 05 07 49 15 3.6 -9 680.50 -54.4 -54.4 -54.0 66 -99 SPO 1997 10 05 07 50 15 3.5 -9 680.50 -54.4 -54.4 -54.0 66 -99 SPO 1997 10 05 07 51 14 3.5 -9 680.50 -54.4 -54.3 -54.0 66 -99 SPO 1997 10 05 07 52 13 3.4 -9 680.50 -54.4 -54.3 -54.0 67 -99 SPO 1997 10 05 07 53 14 3.2 -9 680.50 -54.4 -54.4 -54.0 67 -99 SPO 1997 10 05 07 54 13 3.1 -9 680.50 -54.5 -54.4 -54.1 66 -99 SPO 1997 10 05 07 55 16 3.0 -9 680.50 -54.5 -54.4 -54.1 66 -99 SPO 1997 10 05 07 56 17 3.1 -9 680.50 -54.4 -54.4 -54.1 63 -99 SPO 1997 10 05 07 57 19 3.3 -9 680.50 -54.4 -54.4 -54.1 63 -99 SPO 1997 10 05 07 58 21 3.3 -9 680.50 -54.5 -54.5 -54.1 64 -99 SPO 1997 10 05 07 59 24 3.3 -9 680.50 -54.6 -54.5 -54.1 65 -99 SPO 1997 10 05 08 00 26 3.4 -9 680.50 -54.6 -54.5 -54.2 65 0 SPO 1997 10 05 08 01 25 3.5 -9 680.60 -54.6 -54.5 -54.2 65 -99 SPO 1997 10 05 08 02 22 3.5 -9 680.60 -54.6 -54.5 -54.2 65 -99 SPO 1997 10 05 08 03 21 3.5 -9 680.50 -54.7 -54.5 -54.1 66 -99 SPO 1997 10 05 08 04 22 3.4 -9 680.50 -54.7 -54.5 -54.1 66 -99 SPO 1997 10 05 08 05 23 3.5 -9 680.50 -54.6 -54.5 -54.0 65 -99 SPO 1997 10 05 08 06 21 3.7 -9 680.50 -54.6 -54.5 -54.0 65 -99 SPO 1997 10 05 08 07 19 3.6 -9 680.50 -54.6 -54.5 -54.0 65 -99 SPO 1997 10 05 08 08 18 3.6 -9 680.50 -54.7 -54.5 -54.0 64 -99 SPO 1997 10 05 08 09 17 3.6 -9 680.50 -54.7 -54.5 -53.9 64 -99 SPO 1997 10 05 08 10 18 3.4 -9 680.50 -54.6 -54.4 -53.9 63 -99 SPO 1997 10 05 08 11 20 3.6 -9 680.50 -54.6 -54.4 -53.8 65 -99 SPO 1997 10 05 08 12 22 3.7 -9 680.50 -54.6 -54.5 -53.9 65 -99 SPO 1997 10 05 08 13 22 3.7 -9 680.40 -54.7 -54.5 -54.0 66 -99 SPO 1997 10 05 08 14 20 3.7 -9 680.40 -54.7 -54.6 -54.1 66 -99 SPO 1997 10 05 08 15 19 3.7 -9 680.40 -54.7 -54.6 -54.1 67 -99 SPO 1997 10 05 08 16 17 3.6 -9 680.50 -54.7 -54.6 -54.1 67 -99 SPO 1997 10 05 08 17 17 3.4 -9 680.50 -54.7 -54.6 -54.0 67 -99 SPO 1997 10 05 08 18 17 3.3 -9 680.50 -54.7 -54.6 -53.8 67 -99 SPO 1997 10 05 08 19 17 3.3 -9 680.50 -54.7 -54.6 -53.6 66 -99 SPO 1997 10 05 08 20 17 3.2 -9 680.50 -54.7 -54.5 -53.6 66 -99 SPO 1997 10 05 08 21 15 3.2 -9 680.50 -54.7 -54.5 -53.5 66 -99 SPO 1997 10 05 08 22 16 3.4 -9 680.50 -54.7 -54.5 -53.5 66 -99 SPO 1997 10 05 08 23 17 3.3 -9 680.50 -54.7 -54.5 -53.4 66 -99 SPO 1997 10 05 08 24 17 3.3 -9 680.50 -54.7 -54.5 -53.4 67 -99 SPO 1997 10 05 08 25 17 3.3 -9 680.50 -54.7 -54.5 -53.4 68 -99 SPO 1997 10 05 08 26 18 3.3 -9 680.50 -54.6 -54.5 -53.4 69 -99 SPO 1997 10 05 08 27 17 3.5 -9 680.50 -54.6 -54.5 -53.4 69 -99 SPO 1997 10 05 08 28 15 3.5 -9 680.50 -54.6 -54.5 -53.4 69 -99 SPO 1997 10 05 08 29 16 3.6 -9 680.50 -54.6 -54.5 -53.5 69 -99 SPO 1997 10 05 08 30 16 3.6 -9 680.50 -54.6 -54.5 -53.5 69 -99 SPO 1997 10 05 08 31 17 3.5 -9 680.50 -54.6 -54.6 -53.5 69 -99 SPO 1997 10 05 08 32 17 3.4 -9 680.50 -54.6 -54.6 -53.5 69 -99 SPO 1997 10 05 08 33 16 3.5 -9 680.50 -54.7 -54.6 -53.5 70 -99 SPO 1997 10 05 08 34 15 3.7 -9 680.50 -54.7 -54.7 -53.6 70 -99 SPO 1997 10 05 08 35 14 3.7 -9 680.50 -54.7 -54.7 -53.8 70 -99 SPO 1997 10 05 08 36 14 3.6 -9 680.50 -54.7 -54.7 -53.9 70 -99 SPO 1997 10 05 08 37 14 3.7 -9 680.50 -54.7 -54.7 -53.9 70 -99 SPO 1997 10 05 08 38 15 3.5 -9 680.50 -54.7 -54.7 -53.9 68 -99 SPO 1997 10 05 08 39 17 3.6 -9 680.50 -54.7 -54.8 -54.0 68 -99 SPO 1997 10 05 08 40 16 3.6 -9 680.50 -54.8 -54.8 -54.0 69 -99 SPO 1997 10 05 08 41 13 3.6 -9 680.50 -54.8 -54.8 -54.0 69 -99 SPO 1997 10 05 08 42 12 3.8 -9 680.50 -54.8 -54.8 -54.0 69 -99 SPO 1997 10 05 08 43 12 3.9 -9 680.50 -54.7 -54.8 -54.1 67 -99 SPO 1997 10 05 08 44 13 3.9 -9 680.50 -54.8 -54.8 -54.2 68 -99 SPO 1997 10 05 08 45 13 3.9 -9 680.50 -54.8 -54.8 -54.2 66 -99 SPO 1997 10 05 08 46 13 3.9 -9 680.50 -54.8 -54.9 -54.3 66 -99 SPO 1997 10 05 08 47 11 3.8 -9 680.50 -54.8 -54.9 -54.4 66 -99 SPO 1997 10 05 08 48 8 3.7 -9 680.50 -54.8 -54.9 -54.4 66 -99 SPO 1997 10 05 08 49 7 3.6 -9 680.60 -54.9 -55.0 -54.5 67 -99 SPO 1997 10 05 08 50 9 3.6 -9 680.60 -54.9 -55.0 -54.5 67 -99 SPO 1997 10 05 08 51 12 3.6 -9 680.60 -54.9 -55.0 -54.5 66 -99 SPO 1997 10 05 08 52 14 3.5 -9 680.60 -54.9 -55.0 -54.5 65 -99 SPO 1997 10 05 08 53 14 3.7 -9 680.60 -54.9 -55.0 -54.6 65 -99 SPO 1997 10 05 08 54 17 3.4 -9 680.60 -54.9 -55.0 -54.6 65 -99 SPO 1997 10 05 08 55 16 3.5 -9 680.60 -54.9 -55.0 -54.6 65 -99 SPO 1997 10 05 08 56 18 3.6 -9 680.70 -54.9 -55.0 -54.6 65 -99 SPO 1997 10 05 08 57 19 3.6 -9 680.70 -54.9 -55.0 -54.6 65 -99 SPO 1997 10 05 08 58 20 3.5 -9 680.70 -54.8 -55.0 -54.6 64 -99 SPO 1997 10 05 08 59 20 3.5 -9 680.70 -54.8 -55.0 -54.6 64 -99 SPO 1997 10 05 09 00 18 3.7 -9 680.70 -54.8 -55.0 -54.6 64 0 SPO 1997 10 05 09 01 17 3.6 -9 680.70 -54.8 -55.0 -54.6 64 -99 SPO 1997 10 05 09 02 16 3.5 -9 680.70 -54.8 -55.1 -54.6 64 -99 SPO 1997 10 05 09 03 15 3.6 -9 680.70 -54.8 -55.1 -54.6 64 -99 SPO 1997 10 05 09 04 15 3.6 -9 680.70 -54.8 -55.1 -54.6 64 -99 SPO 1997 10 05 09 05 14 3.5 -9 680.70 -54.8 -55.1 -54.6 65 -99 SPO 1997 10 05 09 06 14 3.6 -9 680.70 -54.9 -55.1 -54.7 66 -99 SPO 1997 10 05 09 07 15 3.6 -9 680.70 -54.9 -55.1 -54.7 65 -99 SPO 1997 10 05 09 08 14 3.6 -9 680.70 -54.9 -55.1 -54.7 65 -99 SPO 1997 10 05 09 09 17 3.9 -9 680.70 -54.9 -55.1 -54.7 65 -99 SPO 1997 10 05 09 10 17 4.0 -9 680.70 -54.9 -55.1 -54.7 63 -99 SPO 1997 10 05 09 11 18 4.1 -9 680.70 -54.9 -55.1 -54.7 63 -99 SPO 1997 10 05 09 12 18 4.1 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 13 16 4.2 -9 680.60 -54.8 -55.1 -54.8 62 -99 SPO 1997 10 05 09 14 15 4.1 -9 680.60 -54.9 -55.1 -54.8 65 -99 SPO 1997 10 05 09 15 15 4.0 -9 680.60 -54.9 -55.1 -54.8 65 -99 SPO 1997 10 05 09 16 14 4.1 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 17 14 4.0 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 18 15 3.9 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 19 16 4.1 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 20 17 4.0 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 21 18 4.0 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 22 18 4.1 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 23 20 3.6 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 24 20 3.6 -9 680.60 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 25 20 3.7 -9 680.70 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 26 20 3.5 -9 680.70 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 27 19 3.9 -9 680.70 -54.9 -55.1 -54.8 63 -99 SPO 1997 10 05 09 28 19 3.8 -9 680.60 -54.8 -55.1 -54.8 64 -99 SPO 1997 10 05 09 29 15 3.9 -9 680.60 -54.8 -55.0 -54.8 64 -99 SPO 1997 10 05 09 30 14 4.0 -9 680.60 -54.8 -55.0 -54.8 64 -99 SPO 1997 10 05 09 31 16 3.6 -9 680.60 -54.8 -55.0 -54.8 62 -99 SPO 1997 10 05 09 32 15 3.9 -9 680.60 -54.8 -55.1 -54.8 62 -99 SPO 1997 10 05 09 33 16 3.8 -9 680.60 -54.8 -55.1 -54.8 62 -99 SPO 1997 10 05 09 34 17 3.5 -9 680.60 -54.8 -55.1 -54.8 62 -99 SPO 1997 10 05 09 35 16 3.8 -9 680.60 -54.8 -55.1 -54.7 62 -99 SPO 1997 10 05 09 36 14 3.8 -9 680.60 -54.8 -55.0 -54.7 64 -99 SPO 1997 10 05 09 37 14 3.3 -9 680.60 -54.7 -55.0 -54.7 63 -99 SPO 1997 10 05 09 38 15 3.8 -9 680.60 -54.7 -55.0 -54.7 63 -99 SPO 1997 10 05 09 39 16 3.7 -9 680.60 -54.8 -55.0 -54.7 65 -99 SPO 1997 10 05 09 40 18 3.7 -9 680.60 -54.7 -55.0 -54.7 66 -99 SPO 1997 10 05 09 41 17 3.4 -9 680.60 -54.7 -55.0 -54.7 66 -99 SPO 1997 10 05 09 42 19 3.7 -9 680.60 -54.7 -55.0 -54.7 66 -99 SPO 1997 10 05 09 43 18 3.7 -9 680.70 -54.7 -55.0 -54.7 64 -99 SPO 1997 10 05 09 44 17 3.5 -9 680.70 -54.6 -54.9 -54.7 63 -99 SPO 1997 10 05 09 45 15 3.2 -9 680.70 -54.7 -54.9 -54.6 63 -99 SPO 1997 10 05 09 46 14 3.5 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 47 13 3.5 -9 680.60 -54.7 -55.0 -54.6 63 -99 SPO 1997 10 05 09 48 10 3.7 -9 680.70 -54.7 -55.0 -54.7 64 -99 SPO 1997 10 05 09 49 7 3.7 -9 680.70 -54.7 -55.0 -54.7 64 -99 SPO 1997 10 05 09 50 5 3.6 -9 680.70 -54.7 -55.0 -54.7 64 -99 SPO 1997 10 05 09 51 5 3.5 -9 680.70 -54.7 -55.0 -54.7 64 -99 SPO 1997 10 05 09 52 6 3.3 -9 680.70 -54.7 -55.0 -54.6 64 -99 SPO 1997 10 05 09 53 4 3.6 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 54 5 3.7 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 55 4 3.6 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 56 3 3.6 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 57 4 3.8 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 58 4 3.7 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 09 59 2 3.9 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 10 00 2 4.0 -9 680.60 -54.6 -54.9 -54.6 65 0 SPO 1997 10 05 10 01 359 3.9 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 02 358 4.0 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 03 360 3.8 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 04 1 3.7 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 05 0 3.8 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 06 2 3.8 -9 680.60 -54.6 -54.9 -54.6 65 -99 SPO 1997 10 05 10 07 4 3.8 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 10 08 4 3.9 -9 680.60 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 10 09 4 4.0 -9 680.50 -54.6 -54.9 -54.6 63 -99 SPO 1997 10 05 10 10 7 3.9 -9 680.50 -54.6 -54.8 -54.6 63 -99 SPO 1997 10 05 10 11 9 4.0 -9 680.50 -54.6 -54.8 -54.6 63 -99 SPO 1997 10 05 10 12 10 4.1 -9 680.50 -54.6 -54.8 -54.6 63 -99 SPO 1997 10 05 10 13 10 3.9 -9 680.50 -54.6 -54.8 -54.6 63 -99 SPO 1997 10 05 10 14 9 3.8 -9 680.50 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 15 8 3.9 -9 680.50 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 16 8 3.9 -9 680.50 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 17 8 3.7 -9 680.60 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 18 6 3.9 -9 680.60 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 19 7 3.8 -9 680.60 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 20 8 3.7 -9 680.50 -54.5 -54.8 -54.5 63 -99 SPO 1997 10 05 10 21 10 3.4 -9 680.50 -54.5 -54.8 -54.4 63 -99 SPO 1997 10 05 10 22 11 3.5 -9 680.50 -54.4 -54.7 -54.4 63 -99 SPO 1997 10 05 10 23 9 3.9 -9 680.50 -54.4 -54.7 -54.4 63 -99 SPO 1997 10 05 10 24 9 3.7 -9 680.50 -54.3 -54.7 -54.4 63 -99 SPO 1997 10 05 10 25 10 3.6 -9 680.40 -54.4 -54.6 -54.4 65 -99 SPO 1997 10 05 10 26 9 3.8 -9 680.40 -54.2 -54.6 -54.3 63 -99 SPO 1997 10 05 10 27 8 3.9 -9 680.40 -54.2 -54.6 -54.2 64 -99 SPO 1997 10 05 10 28 9 3.9 -9 680.40 -54.2 -54.6 -54.3 64 -99 SPO 1997 10 05 10 29 8 4.1 -9 680.40 -54.2 -54.6 -54.2 66 -99 SPO 1997 10 05 10 30 8 3.9 -9 680.40 -54.2 -54.5 -54.3 64 -99 SPO 1997 10 05 10 31 9 3.8 -9 680.40 -54.2 -54.5 -54.2 64 -99 SPO 1997 10 05 10 32 7 4.0 -9 680.40 -54.2 -54.5 -54.2 64 -99 SPO 1997 10 05 10 33 8 4.0 -9 680.40 -54.1 -54.5 -54.2 63 -99 SPO 1997 10 05 10 34 7 3.8 -9 680.40 -54.1 -54.5 -54.2 65 -99 SPO 1997 10 05 10 35 6 3.9 -9 680.40 -54.0 -54.5 -54.1 64 -99 SPO 1997 10 05 10 36 6 3.9 -9 680.40 -54.1 -54.4 -54.1 67 -99 SPO 1997 10 05 10 37 8 3.5 -9 680.40 -54.0 -54.4 -54.1 66 -99 SPO 1997 10 05 10 38 10 3.8 -9 680.40 -54.0 -54.4 -54.0 66 -99 SPO 1997 10 05 10 39 10 3.5 -9 680.40 -54.0 -54.4 -54.0 66 -99 SPO 1997 10 05 10 40 10 3.5 -9 680.40 -54.0 -54.3 -54.0 67 -99 SPO 1997 10 05 10 41 8 3.9 -9 680.40 -53.9 -54.3 -53.9 66 -99 SPO 1997 10 05 10 42 10 3.9 -9 680.30 -53.9 -54.2 -53.9 66 -99 SPO 1997 10 05 10 43 9 4.0 -9 680.30 -53.9 -54.2 -53.9 66 -99 SPO 1997 10 05 10 44 6 3.8 -9 680.30 -53.8 -54.2 -53.8 64 -99 SPO 1997 10 05 10 45 7 3.7 -9 680.30 -53.8 -54.1 -53.8 65 -99 SPO 1997 10 05 10 46 4 3.9 -9 680.30 -53.8 -54.1 -53.8 65 -99 SPO 1997 10 05 10 47 6 4.2 -9 680.20 -53.7 -54.1 -53.8 66 -99 SPO 1997 10 05 10 48 5 4.3 -9 680.30 -53.8 -54.1 -53.8 67 -99 SPO 1997 10 05 10 49 2 3.8 -9 680.30 -53.7 -54.1 -53.7 66 -99 SPO 1997 10 05 10 50 2 3.9 -9 680.30 -53.7 -54.1 -53.7 67 -99 SPO 1997 10 05 10 51 3 3.9 -9 680.30 -53.7 -54.0 -53.7 67 -99 SPO 1997 10 05 10 52 3 3.7 -9 680.30 -53.6 -54.0 -53.7 67 -99 SPO 1997 10 05 10 53 4 4.0 -9 680.30 -53.6 -54.0 -53.7 67 -99 SPO 1997 10 05 10 54 3 4.2 -9 680.30 -53.7 -53.9 -53.7 67 -99 SPO 1997 10 05 10 55 5 4.0 -9 680.30 -53.7 -53.9 -53.7 67 -99 SPO 1997 10 05 10 56 6 4.0 -9 680.30 -53.7 -54.0 -53.7 66 -99 SPO 1997 10 05 10 57 6 3.9 -9 680.30 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 10 58 7 4.1 -9 680.30 -53.7 -53.9 -53.7 66 -99 SPO 1997 10 05 10 59 4 3.9 -9 680.30 -53.7 -53.9 -53.7 66 -99 SPO 1997 10 05 11 00 5 3.9 -9 680.20 -53.6 -53.9 -53.6 65 0 SPO 1997 10 05 11 01 3 3.8 -9 680.20 -53.6 -53.8 -53.6 65 -99 SPO 1997 10 05 11 02 1 4.1 -9 680.20 -53.6 -53.8 -53.6 65 -99 SPO 1997 10 05 11 03 2 4.1 -9 680.30 -53.6 -53.8 -53.6 65 -99 SPO 1997 10 05 11 04 6 3.7 -9 680.30 -53.7 -53.8 -53.6 67 -99 SPO 1997 10 05 11 05 9 3.9 -9 680.30 -53.6 -53.9 -53.6 67 -99 SPO 1997 10 05 11 06 7 3.8 -9 680.30 -53.7 -53.9 -53.6 66 -99 SPO 1997 10 05 11 07 5 4.0 -9 680.30 -53.7 -53.9 -53.6 66 -99 SPO 1997 10 05 11 08 2 3.9 -9 680.30 -53.7 -53.9 -53.6 66 -99 SPO 1997 10 05 11 09 359 3.8 -9 680.30 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 11 10 359 3.6 -9 680.40 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 11 11 360 3.7 -9 680.30 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 11 12 1 3.7 -9 680.40 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 11 13 1 3.5 -9 680.40 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 05 11 14 1 3.3 -9 680.40 -53.6 -53.9 -53.6 67 -99 SPO 1997 10 05 11 15 2 3.4 -9 680.40 -53.6 -53.8 -53.6 67 -99 SPO 1997 10 05 11 16 2 3.3 -9 680.30 -53.6 -53.8 -53.6 67 -99 SPO 1997 10 05 11 17 360 3.4 -9 680.40 -53.6 -53.8 -53.6 67 -99 SPO 1997 10 05 11 18 359 3.6 -9 680.40 -53.5 -53.8 -53.5 64 -99 SPO 1997 10 05 11 19 359 3.3 -9 680.40 -53.5 -53.8 -53.5 64 -99 SPO 1997 10 05 11 20 359 3.3 -9 680.40 -53.5 -53.8 -53.4 64 -99 SPO 1997 10 05 11 21 360 3.1 -9 680.40 -53.4 -53.8 -53.5 64 -99 SPO 1997 10 05 11 22 3 3.1 -9 680.50 -53.5 -53.8 -53.5 64 -99 SPO 1997 10 05 11 23 4 3.2 -9 680.50 -53.5 -53.8 -53.4 66 -99 SPO 1997 10 05 11 24 8 3.2 -9 680.40 -53.4 -53.8 -53.4 65 -99 SPO 1997 10 05 11 25 3 3.5 -9 680.40 -53.5 -53.8 -53.5 66 -99 SPO 1997 10 05 11 26 7 3.4 -9 680.40 -53.5 -53.8 -53.5 66 -99 SPO 1997 10 05 11 27 4 2.9 -9 680.40 -53.4 -53.8 -53.4 65 -99 SPO 1997 10 05 11 28 4 3.1 -9 680.40 -53.4 -53.7 -53.4 65 -99 SPO 1997 10 05 11 29 3 3.5 -9 680.40 -53.4 -53.7 -53.4 65 -99 SPO 1997 10 05 11 30 360 3.7 -9 680.40 -53.4 -53.7 -53.4 65 -99 SPO 1997 10 05 11 31 359 3.4 -9 680.40 -53.4 -53.7 -53.4 65 -99 SPO 1997 10 05 11 32 3 3.2 -9 680.40 -53.4 -53.7 -53.4 65 -99 SPO 1997 10 05 11 33 7 3.4 -9 680.40 -53.4 -53.6 -53.4 65 -99 SPO 1997 10 05 11 34 8 3.1 -9 680.40 -53.4 -53.6 -53.4 64 -99 SPO 1997 10 05 11 35 9 3.3 -9 680.40 -53.3 -53.6 -53.3 64 -99 SPO 1997 10 05 11 36 7 3.4 -9 680.30 -53.3 -53.7 -53.3 64 -99 SPO 1997 10 05 11 37 8 3.7 -9 680.30 -53.3 -53.6 -53.3 64 -99 SPO 1997 10 05 11 38 8 3.5 -9 680.30 -53.3 -53.6 -53.3 64 -99 SPO 1997 10 05 11 39 8 3.7 -9 680.30 -53.3 -53.6 -53.3 65 -99 SPO 1997 10 05 11 40 5 4.0 -9 680.30 -53.3 -53.6 -53.3 65 -99 SPO 1997 10 05 11 41 5 4.1 -9 680.30 -53.3 -53.6 -53.3 65 -99 SPO 1997 10 05 11 42 4 3.9 -9 680.30 -53.2 -53.6 -53.3 64 -99 SPO 1997 10 05 11 43 4 4.0 -9 680.30 -53.2 -53.5 -53.2 64 -99 SPO 1997 10 05 11 44 2 3.7 -9 680.30 -53.2 -53.5 -53.2 64 -99 SPO 1997 10 05 11 45 1 3.9 -9 680.30 -53.2 -53.5 -53.2 64 -99 SPO 1997 10 05 11 46 1 3.8 -9 680.30 -53.2 -53.5 -53.2 64 -99 SPO 1997 10 05 11 47 0 3.4 -9 680.30 -53.2 -53.5 -53.2 64 -99 SPO 1997 10 05 11 48 1 3.3 -9 680.30 -53.1 -53.4 -53.2 64 -99 SPO 1997 10 05 11 49 1 3.8 -9 680.30 -53.2 -53.4 -53.2 64 -99 SPO 1997 10 05 11 50 3 3.5 -9 680.30 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 11 51 6 3.5 -9 680.30 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 11 52 6 3.7 -9 680.30 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 11 53 5 3.5 -9 680.30 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 11 54 2 3.7 -9 680.30 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 11 55 5 3.4 -9 680.30 -53.2 -53.4 -53.2 66 -99 SPO 1997 10 05 11 56 6 3.0 -9 680.40 -53.2 -53.4 -53.2 66 -99 SPO 1997 10 05 11 57 10 3.0 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 11 58 11 3.0 -9 680.50 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 11 59 7 3.3 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 00 7 3.2 -9 680.40 -53.2 -53.4 -53.1 66 0 SPO 1997 10 05 12 01 9 3.4 -9 680.40 -53.2 -53.4 -53.1 66 -99 SPO 1997 10 05 12 02 8 3.4 -9 680.40 -53.2 -53.4 -53.1 66 -99 SPO 1997 10 05 12 03 8 3.2 -9 680.40 -53.2 -53.4 -53.2 66 -99 SPO 1997 10 05 12 04 11 3.2 -9 680.40 -53.2 -53.4 -53.2 66 -99 SPO 1997 10 05 12 05 15 3.3 -9 680.40 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 12 06 15 3.2 -9 680.40 -53.2 -53.5 -53.2 66 -99 SPO 1997 10 05 12 07 18 3.2 -9 680.40 -53.2 -53.5 -53.1 66 -99 SPO 1997 10 05 12 08 15 3.5 -9 680.40 -53.2 -53.5 -53.1 66 -99 SPO 1997 10 05 12 09 17 3.2 -9 680.40 -53.2 -53.4 -53.1 64 -99 SPO 1997 10 05 12 10 19 3.1 -9 680.40 -53.2 -53.4 -53.1 64 -99 SPO 1997 10 05 12 11 19 2.9 -9 680.40 -53.1 -53.4 -53.1 64 -99 SPO 1997 10 05 12 12 14 3.2 -9 680.40 -53.1 -53.4 -53.1 64 -99 SPO 1997 10 05 12 13 12 3.2 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 14 13 3.0 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 15 11 3.0 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 16 10 2.8 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 17 12 3.0 -9 680.40 -53.1 -53.3 -53.1 65 -99 SPO 1997 10 05 12 18 10 3.1 -9 680.40 -53.1 -53.3 -53.0 65 -99 SPO 1997 10 05 12 19 10 2.9 -9 680.40 -53.1 -53.3 -53.0 65 -99 SPO 1997 10 05 12 20 9 3.3 -9 680.30 -53.0 -53.4 -53.0 64 -99 SPO 1997 10 05 12 21 12 3.3 -9 680.30 -53.0 -53.4 -53.1 64 -99 SPO 1997 10 05 12 22 11 3.4 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 23 14 3.3 -9 680.40 -53.1 -53.4 -53.1 65 -99 SPO 1997 10 05 12 24 15 3.4 -9 680.40 -53.1 -53.4 -53.0 65 -99 SPO 1997 10 05 12 25 16 3.3 -9 680.40 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 26 16 3.5 -9 680.40 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 27 16 3.5 -9 680.40 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 28 16 3.5 -9 680.30 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 29 17 3.7 -9 680.30 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 30 17 3.6 -9 680.30 -53.0 -53.3 -53.0 66 -99 SPO 1997 10 05 12 31 13 3.9 -9 680.30 -53.0 -53.2 -53.0 66 -99 SPO 1997 10 05 12 32 16 3.7 -9 680.30 -53.0 -53.2 -53.0 64 -99 SPO 1997 10 05 12 33 16 3.5 -9 680.30 -53.0 -53.2 -53.0 64 -99 SPO 1997 10 05 12 34 19 3.5 -9 680.30 -53.0 -53.2 -53.0 64 -99 SPO 1997 10 05 12 35 18 3.5 -9 680.40 -53.0 -53.2 -53.0 64 -99 SPO 1997 10 05 12 36 20 3.5 -9 680.40 -53.0 -53.2 -53.0 64 -99 SPO 1997 10 05 12 37 19 3.5 -9 680.40 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 38 19 3.5 -9 680.30 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 39 20 3.6 -9 680.30 -53.1 -53.3 -53.0 65 -99 SPO 1997 10 05 12 40 18 3.7 -9 680.30 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 41 19 3.8 -9 680.30 -53.0 -53.3 -53.0 64 -99 SPO 1997 10 05 12 42 19 3.7 -9 680.30 -53.1 -53.3 -53.0 65 -99 SPO 1997 10 05 12 43 20 3.6 -9 680.30 -53.1 -53.3 -53.1 65 -99 SPO 1997 10 05 12 44 21 3.6 -9 680.30 -53.1 -53.3 -53.1 65 -99 SPO 1997 10 05 12 45 24 3.5 -9 680.30 -53.1 -53.3 -53.1 65 -99 SPO 1997 10 05 12 46 24 3.6 -9 680.30 -53.2 -53.3 -53.1 66 -99 SPO 1997 10 05 12 47 23 3.6 -9 680.30 -53.2 -53.3 -53.1 64 -99 SPO 1997 10 05 12 48 19 3.7 -9 680.30 -53.2 -53.4 -53.2 64 -99 SPO 1997 10 05 12 49 16 3.6 -9 680.30 -53.2 -53.3 -53.2 64 -99 SPO 1997 10 05 12 50 14 3.6 -9 680.30 -53.2 -53.3 -53.2 64 -99 SPO 1997 10 05 12 51 15 3.6 -9 680.30 -53.2 -53.4 -53.2 64 -99 SPO 1997 10 05 12 52 13 3.8 -9 680.30 -53.3 -53.4 -53.2 65 -99 SPO 1997 10 05 12 53 11 3.5 -9 680.30 -53.3 -53.4 -53.2 65 -99 SPO 1997 10 05 12 54 11 3.4 -9 680.30 -53.4 -53.4 -53.3 66 -99 SPO 1997 10 05 12 55 12 3.4 -9 680.30 -53.4 -53.4 -53.3 65 -99 SPO 1997 10 05 12 56 11 3.1 -9 680.40 -53.4 -53.4 -53.3 65 -99 SPO 1997 10 05 12 57 8 3.2 -9 680.40 -53.4 -53.4 -53.3 65 -99 SPO 1997 10 05 12 58 8 3.3 -9 680.40 -53.4 -53.4 -53.3 65 -99 SPO 1997 10 05 12 59 8 3.1 -9 680.30 -53.4 -53.4 -53.3 64 -99 SPO 1997 10 05 13 00 6 3.0 -9 680.40 -53.4 -53.3 -53.3 64 0 SPO 1997 10 05 13 01 5 3.1 -9 680.40 -53.4 -53.3 -53.3 65 -99 SPO 1997 10 05 13 02 4 3.0 -9 680.40 -53.4 -53.3 -53.3 65 -99 SPO 1997 10 05 13 03 3 2.9 -9 680.40 -53.4 -53.3 -53.3 65 -99 SPO 1997 10 05 13 04 2 3.0 -9 680.40 -53.4 -53.3 -53.3 65 -99 SPO 1997 10 05 13 05 4 3.1 -9 680.30 -53.5 -53.3 -53.4 66 -99 SPO 1997 10 05 13 06 6 3.3 -9 680.30 -53.5 -53.3 -53.4 64 -99 SPO 1997 10 05 13 07 6 3.3 -9 680.30 -53.5 -53.3 -53.4 64 -99 SPO 1997 10 05 13 08 5 3.2 -9 680.40 -53.6 -53.3 -53.5 65 -99 SPO 1997 10 05 13 09 4 3.2 -9 680.40 -53.6 -53.3 -53.4 65 -99 SPO 1997 10 05 13 10 4 3.0 -9 680.40 -53.6 -53.4 -53.5 65 -99 SPO 1997 10 05 13 11 7 3.0 -9 680.40 -53.6 -53.4 -53.5 64 -99 SPO 1997 10 05 13 12 10 3.1 -9 680.40 -53.7 -53.4 -53.5 64 -99 SPO 1997 10 05 13 13 13 3.1 -9 680.40 -53.7 -53.4 -53.5 64 -99 SPO 1997 10 05 13 14 14 3.0 -9 680.40 -53.7 -53.5 -53.6 64 -99 SPO 1997 10 05 13 15 14 3.1 -9 680.40 -53.7 -53.5 -53.6 64 -99 SPO 1997 10 05 13 16 14 3.2 -9 680.40 -53.7 -53.5 -53.6 66 -99 SPO 1997 10 05 13 17 15 3.3 -9 680.40 -53.8 -53.5 -53.6 67 -99 SPO 1997 10 05 13 18 16 3.4 -9 680.40 -53.8 -53.5 -53.6 65 -99 SPO 1997 10 05 13 19 15 3.5 -9 680.30 -53.8 -53.5 -53.7 65 -99 SPO 1997 10 05 13 20 13 3.5 -9 680.30 -53.8 -53.5 -53.7 65 -99 SPO 1997 10 05 13 21 13 3.7 -9 680.30 -53.9 -53.5 -53.7 65 -99 SPO 1997 10 05 13 22 12 3.6 -9 680.30 -53.9 -53.5 -53.7 65 -99 SPO 1997 10 05 13 23 11 3.6 -9 680.30 -53.9 -53.5 -53.7 63 -99 SPO 1997 10 05 13 24 9 3.7 -9 680.30 -53.9 -53.5 -53.7 63 -99 SPO 1997 10 05 13 25 9 3.7 -9 680.30 -53.9 -53.5 -53.8 63 -99 SPO 1997 10 05 13 26 9 3.7 -9 680.30 -54.0 -53.5 -53.8 66 -99 SPO 1997 10 05 13 27 9 3.6 -9 680.30 -54.0 -53.5 -53.8 66 -99 SPO 1997 10 05 13 28 9 3.5 -9 680.30 -54.0 -53.5 -53.8 66 -99 SPO 1997 10 05 13 29 8 3.5 -9 680.30 -54.0 -53.5 -53.9 66 -99 SPO 1997 10 05 13 30 7 3.5 -9 680.30 -54.0 -53.5 -53.9 66 -99 SPO 1997 10 05 13 31 6 3.6 -9 680.30 -54.0 -53.5 -53.9 66 -99 SPO 1997 10 05 13 32 5 3.6 -9 680.30 -54.0 -53.5 -53.9 64 -99 SPO 1997 10 05 13 33 2 3.6 -9 680.30 -54.1 -53.5 -53.9 65 -99 SPO 1997 10 05 13 34 360 3.7 -9 680.30 -54.0 -53.4 -53.9 64 -99 SPO 1997 10 05 13 35 359 3.7 -9 680.30 -54.1 -53.4 -54.0 63 -99 SPO 1997 10 05 13 36 360 3.6 -9 680.30 -54.1 -53.4 -54.0 63 -99 SPO 1997 10 05 13 37 359 3.6 -9 680.40 -54.1 -53.4 -54.0 63 -99 SPO 1997 10 05 13 38 358 3.6 -9 680.40 -54.1 -53.4 -54.0 63 -99 SPO 1997 10 05 13 39 357 3.7 -9 680.30 -54.2 -53.4 -54.0 64 -99 SPO 1997 10 05 13 40 356 3.9 -9 680.30 -54.2 -53.4 -54.0 64 -99 SPO 1997 10 05 13 41 355 4.0 -9 680.30 -54.2 -53.4 -54.0 64 -99 SPO 1997 10 05 13 42 356 4.1 -9 680.30 -54.2 -53.5 -54.1 66 -99 SPO 1997 10 05 13 43 358 4.1 -9 680.30 -54.3 -53.5 -54.1 67 -99 SPO 1997 10 05 13 44 1 3.9 -9 680.30 -54.3 -53.5 -54.2 65 -99 SPO 1997 10 05 13 45 2 3.9 -9 680.30 -54.3 -53.5 -54.2 64 -99 SPO 1997 10 05 13 46 2 3.9 -9 680.30 -54.4 -53.5 -54.2 65 -99 SPO 1997 10 05 13 47 4 3.9 -9 680.30 -54.4 -53.5 -54.2 63 -99 SPO 1997 10 05 13 48 5 3.9 -9 680.30 -54.4 -53.5 -54.3 63 -99 SPO 1997 10 05 13 49 6 3.6 -9 680.30 -54.4 -53.4 -54.3 63 -99 SPO 1997 10 05 13 50 9 3.6 -9 680.30 -54.4 -53.5 -54.3 63 -99 SPO 1997 10 05 13 51 11 3.7 -9 680.30 -54.4 -53.5 -54.3 63 -99 SPO 1997 10 05 13 52 14 3.5 -9 680.30 -54.5 -53.5 -54.3 64 -99 SPO 1997 10 05 13 53 17 3.5 -9 680.30 -54.6 -53.6 -54.4 63 -99 SPO 1997 10 05 13 54 17 3.6 -9 680.40 -54.6 -53.6 -54.4 63 -99 SPO 1997 10 05 13 55 16 3.4 -9 680.40 -54.6 -53.6 -54.4 63 -99 SPO 1997 10 05 13 56 17 3.5 -9 680.40 -54.6 -53.7 -54.4 63 -99 SPO 1997 10 05 13 57 18 3.2 -9 680.40 -54.6 -53.7 -54.5 63 -99 SPO 1997 10 05 13 58 19 3.2 -9 680.40 -54.7 -53.7 -54.5 63 -99 SPO 1997 10 05 13 59 19 3.2 -9 680.40 -54.8 -53.7 -54.5 64 -99 SPO 1997 10 05 14 00 19 3.1 -9 680.40 -54.8 -53.7 -54.6 62 0 SPO 1997 10 05 14 01 20 3.1 -9 680.50 -54.8 -53.7 -54.6 62 -99 SPO 1997 10 05 14 02 20 3.2 -9 680.50 -54.9 -53.7 -54.6 63 -99 SPO 1997 10 05 14 03 20 3.1 -9 680.50 -54.9 -53.7 -54.6 63 -99 SPO 1997 10 05 14 04 21 3.2 -9 680.50 -54.9 -53.7 -54.7 63 -99 SPO 1997 10 05 14 05 20 3.1 -9 680.50 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 05 14 06 18 3.3 -9 680.50 -55.0 -53.8 -54.8 62 -99 SPO 1997 10 05 14 07 18 3.4 -9 680.50 -55.1 -53.7 -54.8 63 -99 SPO 1997 10 05 14 08 18 3.3 -9 680.50 -55.1 -53.8 -54.9 62 -99 SPO 1997 10 05 14 09 20 3.4 -9 680.50 -55.2 -53.8 -54.9 63 -99 SPO 1997 10 05 14 10 20 3.4 -9 680.50 -55.2 -53.8 -55.0 62 -99 SPO 1997 10 05 14 11 18 3.5 -9 680.50 -55.3 -53.9 -55.0 62 -99 SPO 1997 10 05 14 12 17 3.6 -9 680.50 -55.4 -53.9 -55.0 63 -99 SPO 1997 10 05 14 13 20 3.5 -9 680.50 -55.4 -53.8 -55.1 63 -99 SPO 1997 10 05 14 14 22 3.5 -9 680.50 -55.5 -53.9 -55.2 64 -99 SPO 1997 10 05 14 15 22 3.5 -9 680.50 -55.6 -53.9 -55.2 63 -99 SPO 1997 10 05 14 16 20 3.6 -9 680.60 -55.6 -53.8 -55.2 63 -99 SPO 1997 10 05 14 17 21 3.8 -9 680.50 -55.6 -53.9 -55.3 62 -99 SPO 1997 10 05 14 18 20 3.8 -9 680.50 -55.6 -53.9 -55.3 62 -99 SPO 1997 10 05 14 19 22 3.7 -9 680.50 -55.6 -53.9 -55.3 62 -99 SPO 1997 10 05 14 20 21 3.8 -9 680.60 -55.6 -54.0 -55.4 62 -99 SPO 1997 10 05 14 21 21 3.8 -9 680.60 -55.6 -54.0 -55.4 61 -99 SPO 1997 10 05 14 22 22 4.0 -9 680.60 -55.7 -54.0 -55.4 61 -99 SPO 1997 10 05 14 23 23 3.9 -9 680.60 -55.7 -54.0 -55.5 61 -99 SPO 1997 10 05 14 24 23 4.0 -9 680.60 -55.8 -54.2 -55.5 62 -99 SPO 1997 10 05 14 25 21 4.1 -9 680.60 -55.8 -54.2 -55.5 62 -99 SPO 1997 10 05 14 26 21 4.3 -9 680.50 -55.9 -54.1 -55.6 63 -99 SPO 1997 10 05 14 27 19 4.3 -9 680.50 -55.9 -54.1 -55.6 63 -99 SPO 1997 10 05 14 28 20 4.5 -9 680.50 -55.9 -54.1 -55.6 63 -99 SPO 1997 10 05 14 29 21 4.4 -9 680.50 -55.9 -54.1 -55.6 63 -99 SPO 1997 10 05 14 30 21 4.5 -9 680.50 -55.9 -54.1 -55.7 63 -99 SPO 1997 10 05 14 31 20 4.5 -9 680.50 -55.9 -54.1 -55.7 63 -99 SPO 1997 10 05 14 32 19 4.6 -9 680.50 -55.9 -54.1 -55.7 61 -99 SPO 1997 10 05 14 33 18 4.6 -9 680.40 -55.9 -54.1 -55.7 61 -99 SPO 1997 10 05 14 34 20 4.7 -9 680.50 -55.9 -54.1 -55.7 61 -99 SPO 1997 10 05 14 35 21 4.8 -9 680.50 -55.9 -54.1 -55.8 61 -99 SPO 1997 10 05 14 36 20 4.8 -9 680.50 -56.0 -54.1 -55.8 61 -99 SPO 1997 10 05 14 37 19 4.8 -9 680.50 -55.9 -54.2 -55.8 61 -99 SPO 1997 10 05 14 38 19 5.0 -9 680.50 -55.9 -54.2 -55.7 61 -99 SPO 1997 10 05 14 39 19 5.0 -9 680.50 -55.9 -54.2 -55.7 61 -99 SPO 1997 10 05 14 40 18 5.1 -9 680.50 -55.9 -54.2 -55.7 63 -99 SPO 1997 10 05 14 41 18 5.1 -9 680.50 -55.9 -54.3 -55.7 63 -99 SPO 1997 10 05 14 42 18 4.9 -9 680.50 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 14 43 19 5.0 -9 680.60 -56.0 -54.3 -55.8 64 -99 SPO 1997 10 05 14 44 22 5.0 -9 680.60 -56.0 -54.3 -55.8 64 -99 SPO 1997 10 05 14 45 22 5.0 -9 680.60 -56.0 -54.3 -55.7 64 -99 SPO 1997 10 05 14 46 22 4.8 -9 680.60 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 14 47 23 5.0 -9 680.60 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 48 25 4.8 -9 680.60 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 49 24 5.0 -9 680.60 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 50 24 5.1 -9 680.60 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 51 24 5.2 -9 680.50 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 52 23 5.3 -9 680.50 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 53 21 5.5 -9 680.40 -56.1 -54.3 -55.9 63 -99 SPO 1997 10 05 14 54 20 5.7 -9 680.40 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 55 18 5.6 -9 680.40 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 56 16 5.8 -9 680.50 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 14 57 13 4.9 -9 680.50 -55.5 -54.2 -55.4 59 -99 SPO 1997 10 05 14 58 17 5.3 -9 680.60 -55.7 -54.3 -55.6 61 -99 SPO 1997 10 05 14 59 19 5.0 -9 680.60 -55.8 -54.3 -55.6 62 -99 SPO 1997 10 05 15 00 17 5.0 -9 680.60 -56.0 -54.3 -55.8 64 0 SPO 1997 10 05 15 01 15 5.0 -9 680.50 -56.0 -54.3 -55.8 64 -99 SPO 1997 10 05 15 02 13 5.0 -9 680.50 -56.0 -54.3 -55.9 64 -99 SPO 1997 10 05 15 03 12 5.2 -9 680.50 -56.0 -54.3 -55.9 64 -99 SPO 1997 10 05 15 04 12 5.3 -9 680.50 -56.0 -54.3 -55.9 64 -99 SPO 1997 10 05 15 05 12 5.4 -9 680.50 -56.0 -54.3 -55.9 64 -99 SPO 1997 10 05 15 06 13 5.4 -9 680.50 -56.0 -54.3 -55.8 64 -99 SPO 1997 10 05 15 07 12 5.4 -9 680.50 -56.0 -54.3 -55.9 62 -99 SPO 1997 10 05 15 08 11 5.5 -9 680.50 -56.0 -54.3 -55.9 62 -99 SPO 1997 10 05 15 09 11 5.4 -9 680.60 -56.0 -54.4 -55.9 62 -99 SPO 1997 10 05 15 10 11 5.2 -9 680.60 -56.0 -54.4 -55.9 61 -99 SPO 1997 10 05 15 11 10 5.2 -9 680.70 -56.0 -54.4 -55.9 61 -99 SPO 1997 10 05 15 12 8 5.2 -9 680.70 -56.0 -54.4 -55.9 61 -99 SPO 1997 10 05 15 13 6 5.2 -9 680.70 -56.0 -54.4 -55.9 62 -99 SPO 1997 10 05 15 14 6 5.4 -9 680.60 -56.0 -54.4 -55.8 62 -99 SPO 1997 10 05 15 15 5 5.4 -9 680.70 -56.0 -54.4 -55.8 64 -99 SPO 1997 10 05 15 16 5 5.4 -9 680.60 -55.9 -54.4 -55.8 63 -99 SPO 1997 10 05 15 17 5 5.4 -9 680.60 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 15 18 3 5.4 -9 680.60 -56.0 -54.3 -55.8 64 -99 SPO 1997 10 05 15 19 2 5.2 -9 680.60 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 15 20 1 5.1 -9 680.60 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 15 21 360 4.9 -9 680.70 -55.9 -54.3 -55.8 63 -99 SPO 1997 10 05 15 22 0 4.7 -9 680.70 -56.0 -54.3 -55.8 62 -99 SPO 1997 10 05 15 23 3 4.7 -9 680.70 -56.0 -54.4 -55.8 61 -99 SPO 1997 10 05 15 24 4 4.8 -9 680.70 -56.0 -54.4 -55.8 62 -99 SPO 1997 10 05 15 25 5 4.8 -9 680.70 -56.0 -54.4 -55.8 64 -99 SPO 1997 10 05 15 26 6 4.8 -9 680.70 -56.1 -54.5 -55.8 64 -99 SPO 1997 10 05 15 27 5 4.8 -9 680.70 -56.1 -54.5 -55.9 63 -99 SPO 1997 10 05 15 28 5 4.8 -9 680.70 -56.2 -54.5 -55.9 64 -99 SPO 1997 10 05 15 29 4 4.9 -9 680.70 -56.1 -54.5 -55.9 63 -99 SPO 1997 10 05 15 30 4 4.9 -9 680.70 -56.1 -54.5 -55.9 63 -99 SPO 1997 10 05 15 31 5 4.8 -9 680.70 -56.2 -54.5 -55.9 63 -99 SPO 1997 10 05 15 32 4 4.8 -9 680.70 -56.1 -54.5 -55.9 62 -99 SPO 1997 10 05 15 33 4 4.7 -9 680.70 -56.1 -54.5 -55.8 62 -99 SPO 1997 10 05 15 34 5 4.7 -9 680.70 -56.1 -54.5 -55.8 62 -99 SPO 1997 10 05 15 35 4 4.6 -9 680.70 -56.1 -54.5 -55.8 62 -99 SPO 1997 10 05 15 36 4 4.5 -9 680.80 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 15 37 5 4.3 -9 680.80 -56.1 -54.4 -55.7 62 -99 SPO 1997 10 05 15 38 7 4.3 -9 680.80 -56.2 -54.5 -55.8 63 -99 SPO 1997 10 05 15 39 7 4.5 -9 680.70 -56.1 -54.5 -55.7 62 -99 SPO 1997 10 05 15 40 6 4.5 -9 680.70 -56.0 -54.5 -55.7 62 -99 SPO 1997 10 05 15 41 8 4.3 -9 680.70 -56.1 -54.5 -55.7 63 -99 SPO 1997 10 05 15 42 9 4.5 -9 680.70 -56.2 -54.5 -55.8 64 -99 SPO 1997 10 05 15 43 9 4.6 -9 680.70 -56.2 -54.5 -55.8 64 -99 SPO 1997 10 05 15 44 9 4.5 -9 680.70 -56.1 -54.5 -55.8 62 -99 SPO 1997 10 05 15 45 10 4.6 -9 680.70 -56.1 -54.5 -55.7 62 -99 SPO 1997 10 05 15 46 10 4.6 -9 680.70 -56.1 -54.5 -55.8 62 -99 SPO 1997 10 05 15 47 10 4.5 -9 680.70 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 15 48 10 4.4 -9 680.70 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 15 49 9 4.5 -9 680.70 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 15 50 8 4.5 -9 680.70 -56.1 -54.3 -55.7 63 -99 SPO 1997 10 05 15 51 8 4.5 -9 680.70 -56.1 -54.3 -55.8 63 -99 SPO 1997 10 05 15 52 7 4.5 -9 680.70 -56.1 -54.3 -55.8 62 -99 SPO 1997 10 05 15 53 6 4.4 -9 680.80 -56.2 -54.3 -55.8 64 -99 SPO 1997 10 05 15 54 5 4.4 -9 680.80 -56.2 -54.4 -55.8 64 -99 SPO 1997 10 05 15 55 5 4.5 -9 680.80 -56.2 -54.4 -55.8 64 -99 SPO 1997 10 05 15 56 5 4.5 -9 680.80 -56.2 -54.4 -55.8 64 -99 SPO 1997 10 05 15 57 6 4.5 -9 680.70 -56.2 -54.4 -55.8 63 -99 SPO 1997 10 05 15 58 7 4.7 -9 680.70 -56.2 -54.4 -55.8 63 -99 SPO 1997 10 05 15 59 8 4.7 -9 680.70 -56.2 -54.4 -55.9 63 -99 SPO 1997 10 05 16 00 8 4.6 -9 680.70 -56.2 -54.4 -55.9 63 0 SPO 1997 10 05 16 01 7 4.6 -9 680.80 -56.3 -54.4 -55.9 64 -99 SPO 1997 10 05 16 02 7 4.6 -9 680.80 -56.2 -54.3 -55.9 63 -99 SPO 1997 10 05 16 03 6 4.7 -9 680.80 -56.2 -54.4 -55.9 63 -99 SPO 1997 10 05 16 04 5 4.7 -9 680.80 -56.2 -54.3 -55.8 63 -99 SPO 1997 10 05 16 05 5 4.7 -9 680.80 -56.1 -54.3 -55.8 62 -99 SPO 1997 10 05 16 06 5 4.6 -9 680.90 -56.2 -54.3 -55.8 63 -99 SPO 1997 10 05 16 07 4 4.5 -9 680.90 -56.1 -54.4 -55.9 62 -99 SPO 1997 10 05 16 08 3 4.6 -9 680.90 -56.2 -54.4 -55.9 63 -99 SPO 1997 10 05 16 09 3 4.6 -9 680.90 -56.1 -54.4 -55.9 61 -99 SPO 1997 10 05 16 10 4 4.7 -9 680.80 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 16 11 5 4.8 -9 680.80 -56.0 -54.4 -55.8 61 -99 SPO 1997 10 05 16 12 6 4.8 -9 680.80 -56.1 -54.4 -55.8 62 -99 SPO 1997 10 05 16 13 6 5.0 -9 680.80 -56.1 -54.4 -55.8 63 -99 SPO 1997 10 05 16 14 4 5.0 -9 680.80 -56.1 -54.4 -55.8 64 -99 SPO 1997 10 05 16 15 5 5.0 -9 680.80 -56.0 -54.4 -55.8 64 -99 SPO 1997 10 05 16 16 5 5.1 -9 680.70 -55.9 -54.4 -55.8 63 -99 SPO 1997 10 05 16 17 5 5.2 -9 680.70 -55.9 -54.3 -55.7 63 -99 SPO 1997 10 05 16 18 5 5.2 -9 680.80 -55.9 -54.3 -55.7 63 -99 SPO 1997 10 05 16 19 5 5.3 -9 680.70 -55.8 -54.3 -55.7 62 -99 SPO 1997 10 05 16 20 6 5.4 -9 680.70 -55.8 -54.3 -55.7 62 -99 SPO 1997 10 05 16 21 7 5.3 -9 680.70 -55.8 -54.3 -55.7 62 -99 SPO 1997 10 05 16 22 6 5.4 -9 680.70 -55.8 -54.3 -55.7 62 -99 SPO 1997 10 05 16 23 5 5.4 -9 680.70 -55.8 -54.3 -55.6 62 -99 SPO 1997 10 05 16 24 3 5.4 -9 680.80 -55.8 -54.3 -55.6 62 -99 SPO 1997 10 05 16 25 2 5.4 -9 680.80 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 26 2 5.4 -9 680.80 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 27 1 5.4 -9 680.90 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 28 1 5.4 -9 680.90 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 29 2 5.4 -9 680.90 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 30 3 5.5 -9 680.90 -55.8 -54.3 -55.6 64 -99 SPO 1997 10 05 16 31 4 5.4 -9 680.90 -55.8 -54.2 -55.5 64 -99 SPO 1997 10 05 16 32 3 5.5 -9 680.90 -55.8 -54.2 -55.5 64 -99 SPO 1997 10 05 16 33 3 5.5 -9 680.80 -55.7 -54.2 -55.4 63 -99 SPO 1997 10 05 16 34 2 5.5 -9 680.80 -55.7 -54.2 -55.4 63 -99 SPO 1997 10 05 16 35 3 5.4 -9 680.90 -55.7 -54.2 -55.4 63 -99 SPO 1997 10 05 16 36 4 5.4 -9 680.90 -55.7 -54.2 -55.4 63 -99 SPO 1997 10 05 16 37 5 5.5 -9 680.90 -55.7 -54.3 -55.3 63 -99 SPO 1997 10 05 16 38 6 5.5 -9 680.90 -55.6 -54.3 -55.3 62 -99 SPO 1997 10 05 16 39 4 5.6 -9 680.80 -55.6 -54.4 -55.3 63 -99 SPO 1997 10 05 16 40 4 5.7 -9 680.80 -55.6 -54.4 -55.2 63 -99 SPO 1997 10 05 16 41 3 5.7 -9 680.80 -55.6 -54.4 -55.2 63 -99 SPO 1997 10 05 16 42 3 5.6 -9 680.90 -55.7 -54.4 -55.3 65 -99 SPO 1997 10 05 16 43 5 5.5 -9 680.90 -55.7 -54.3 -55.3 64 -99 SPO 1997 10 05 16 44 6 5.4 -9 680.90 -55.7 -54.4 -55.3 64 -99 SPO 1997 10 05 16 45 7 5.5 -9 680.90 -55.7 -54.4 -55.3 64 -99 SPO 1997 10 05 16 46 7 5.5 -9 680.90 -55.7 -54.4 -55.2 63 -99 SPO 1997 10 05 16 47 8 5.5 -9 680.90 -55.6 -54.4 -55.2 62 -99 SPO 1997 10 05 16 48 7 5.5 -9 680.90 -55.6 -54.4 -55.2 63 -99 SPO 1997 10 05 16 49 7 5.5 -9 680.90 -55.6 -54.4 -55.2 65 -99 SPO 1997 10 05 16 50 7 5.6 -9 680.90 -55.6 -54.4 -55.2 65 -99 SPO 1997 10 05 16 51 8 5.7 -9 680.80 -55.6 -54.4 -55.2 65 -99 SPO 1997 10 05 16 52 8 5.7 -9 680.90 -55.5 -54.4 -55.2 64 -99 SPO 1997 10 05 16 53 8 5.6 -9 680.90 -55.5 -54.4 -55.1 64 -99 SPO 1997 10 05 16 54 10 5.6 -9 680.90 -55.5 -54.4 -55.1 64 -99 SPO 1997 10 05 16 55 12 5.6 -9 680.90 -55.5 -54.5 -55.1 64 -99 SPO 1997 10 05 16 56 13 5.3 -9 681.00 -55.5 -54.5 -55.1 64 -99 SPO 1997 10 05 16 57 14 5.2 -9 681.00 -55.5 -54.5 -55.1 64 -99 SPO 1997 10 05 16 58 15 5.1 -9 681.10 -55.6 -54.5 -55.1 63 -99 SPO 1997 10 05 16 59 14 5.1 -9 681.10 -55.6 -54.5 -55.1 63 -99 SPO 1997 10 05 17 00 14 5.2 -9 681.10 -55.6 -54.5 -55.1 65 0 SPO 1997 10 05 17 01 12 5.2 -9 681.10 -55.6 -54.6 -55.2 65 -99 SPO 1997 10 05 17 02 12 5.4 -9 681.10 -55.6 -54.6 -55.1 65 -99 SPO 1997 10 05 17 03 12 5.5 -9 681.10 -55.5 -54.6 -55.1 64 -99 SPO 1997 10 05 17 04 13 5.4 -9 681.10 -55.5 -54.5 -55.2 65 -99 SPO 1997 10 05 17 05 14 5.5 -9 681.10 -55.5 -54.5 -55.2 65 -99 SPO 1997 10 05 17 06 15 5.5 -9 681.10 -55.5 -54.5 -55.1 65 -99 SPO 1997 10 05 17 07 14 5.5 -9 681.10 -55.5 -54.5 -55.2 64 -99 SPO 1997 10 05 17 08 12 5.6 -9 681.10 -55.5 -54.5 -55.2 64 -99 SPO 1997 10 05 17 09 12 5.6 -9 681.10 -55.5 -54.5 -55.2 64 -99 SPO 1997 10 05 17 10 11 5.7 -9 681.10 -55.5 -54.6 -55.2 64 -99 SPO 1997 10 05 17 11 11 5.6 -9 681.10 -55.5 -54.6 -55.2 64 -99 SPO 1997 10 05 17 12 11 5.7 -9 681.10 -55.5 -54.6 -55.2 65 -99 SPO 1997 10 05 17 13 10 5.8 -9 681.10 -55.5 -54.6 -55.2 65 -99 SPO 1997 10 05 17 14 10 5.8 -9 681.10 -55.6 -54.6 -55.2 66 -99 SPO 1997 10 05 17 15 9 5.8 -9 681.00 -55.5 -54.6 -55.2 65 -99 SPO 1997 10 05 17 16 9 5.7 -9 681.00 -55.5 -54.6 -55.2 65 -99 SPO 1997 10 05 17 17 10 5.6 -9 681.00 -55.5 -54.6 -55.2 65 -99 SPO 1997 10 05 17 18 11 5.5 -9 681.00 -55.5 -54.5 -55.2 65 -99 SPO 1997 10 05 17 19 12 5.4 -9 681.00 -55.5 -54.5 -55.2 64 -99 SPO 1997 10 05 17 20 12 5.3 -9 681.00 -55.5 -54.5 -55.2 64 -99 SPO 1997 10 05 17 21 12 5.3 -9 681.00 -55.6 -54.6 -55.2 65 -99 SPO 1997 10 05 17 22 12 5.1 -9 681.00 -55.5 -54.6 -55.2 64 -99 SPO 1997 10 05 17 23 13 5.1 -9 681.00 -55.6 -54.6 -55.3 65 -99 SPO 1997 10 05 17 24 14 5.1 -9 681.00 -55.6 -54.6 -55.3 65 -99 SPO 1997 10 05 17 25 13 5.0 -9 681.10 -55.6 -54.6 -55.4 65 -99 SPO 1997 10 05 17 26 13 5.1 -9 681.10 -55.7 -54.6 -55.4 65 -99 SPO 1997 10 05 17 27 12 5.2 -9 681.10 -55.7 -54.6 -55.4 65 -99 SPO 1997 10 05 17 28 12 5.3 -9 681.00 -55.8 -54.7 -55.5 66 -99 SPO 1997 10 05 17 29 12 5.4 -9 681.00 -55.8 -54.7 -55.5 66 -99 SPO 1997 10 05 17 30 12 5.4 -9 681.00 -55.8 -54.6 -55.5 65 -99 SPO 1997 10 05 17 31 13 5.3 -9 681.00 -55.8 -54.6 -55.6 65 -99 SPO 1997 10 05 17 32 14 5.3 -9 681.00 -55.9 -54.6 -55.6 65 -99 SPO 1997 10 05 17 33 15 5.4 -9 681.00 -55.9 -54.7 -55.6 65 -99 SPO 1997 10 05 17 34 16 5.4 -9 681.00 -55.8 -54.7 -55.6 64 -99 SPO 1997 10 05 17 35 16 5.3 -9 681.00 -55.8 -54.8 -55.6 64 -99 SPO 1997 10 05 17 36 16 5.2 -9 681.00 -55.9 -54.9 -55.6 65 -99 SPO 1997 10 05 17 37 18 5.1 -9 681.00 -55.9 -54.9 -55.6 65 -99 SPO 1997 10 05 17 38 19 5.0 -9 681.00 -55.9 -55.0 -55.6 65 -99 SPO 1997 10 05 17 39 19 4.9 -9 681.10 -55.9 -55.0 -55.6 65 -99 SPO 1997 10 05 17 40 19 4.9 -9 681.00 -56.0 -55.1 -55.6 64 -99 SPO 1997 10 05 17 41 18 4.9 -9 681.00 -56.0 -55.2 -55.7 64 -99 SPO 1997 10 05 17 42 19 4.8 -9 681.10 -56.0 -55.3 -55.7 64 -99 SPO 1997 10 05 17 43 20 5.0 -9 681.10 -56.0 -55.4 -55.7 64 -99 SPO 1997 10 05 17 44 20 4.9 -9 681.10 -56.1 -55.5 -55.8 64 -99 SPO 1997 10 05 17 45 21 5.1 -9 681.00 -56.1 -55.4 -55.8 64 -99 SPO 1997 10 05 17 46 20 5.0 -9 681.00 -56.1 -55.3 -55.8 64 -99 SPO 1997 10 05 17 47 21 5.2 -9 681.00 -56.2 -55.4 -55.9 65 -99 SPO 1997 10 05 17 48 22 5.1 -9 681.00 -56.2 -55.4 -55.9 65 -99 SPO 1997 10 05 17 49 21 5.2 -9 681.00 -56.2 -55.4 -55.9 65 -99 SPO 1997 10 05 17 50 21 5.1 -9 681.00 -56.2 -55.2 -55.9 65 -99 SPO 1997 10 05 17 51 22 5.2 -9 681.00 -56.2 -55.2 -56.0 65 -99 SPO 1997 10 05 17 52 22 5.3 -9 681.00 -56.3 -55.2 -56.0 66 -99 SPO 1997 10 05 17 53 23 5.4 -9 681.00 -56.3 -55.2 -56.0 64 -99 SPO 1997 10 05 17 54 22 5.4 -9 681.00 -56.3 -55.2 -56.0 64 -99 SPO 1997 10 05 17 55 21 5.3 -9 681.00 -56.3 -55.2 -56.0 64 -99 SPO 1997 10 05 17 56 21 5.5 -9 681.00 -56.3 -55.2 -56.0 62 -99 SPO 1997 10 05 17 57 20 5.5 -9 681.00 -56.3 -55.2 -56.0 62 -99 SPO 1997 10 05 17 58 19 5.5 -9 681.00 -56.3 -55.1 -56.0 64 -99 SPO 1997 10 05 17 59 16 5.4 -9 681.00 -56.3 -55.1 -56.0 64 -99 SPO 1997 10 05 18 00 15 5.3 -9 681.00 -56.3 -55.0 -56.0 64 0 SPO 1997 10 05 18 01 14 5.4 -9 681.00 -56.3 -55.0 -56.1 64 -99 SPO 1997 10 05 18 02 13 5.4 -9 681.00 -56.3 -55.0 -56.1 64 -99 SPO 1997 10 05 18 03 12 5.2 -9 681.10 -56.3 -55.0 -56.1 64 -99 SPO 1997 10 05 18 04 12 5.2 -9 681.10 -56.4 -55.2 -56.1 64 -99 SPO 1997 10 05 18 05 12 5.4 -9 681.10 -56.4 -55.2 -56.1 64 -99 SPO 1997 10 05 18 06 9 5.3 -9 681.10 -56.4 -55.1 -56.1 64 -99 SPO 1997 10 05 18 07 10 5.4 -9 681.10 -56.4 -55.1 -56.1 64 -99 SPO 1997 10 05 18 08 11 5.5 -9 681.00 -56.4 -55.0 -56.1 64 -99 SPO 1997 10 05 18 09 10 5.3 -9 681.00 -56.4 -55.1 -56.1 64 -99 SPO 1997 10 05 18 10 10 5.3 -9 681.10 -56.4 -55.2 -56.1 64 -99 SPO 1997 10 05 18 11 12 5.4 -9 681.10 -56.4 -55.2 -56.1 64 -99 SPO 1997 10 05 18 12 12 5.3 -9 681.10 -56.5 -55.3 -56.1 65 -99 SPO 1997 10 05 18 13 12 5.4 -9 681.00 -56.5 -55.3 -56.1 65 -99 SPO 1997 10 05 18 14 12 5.5 -9 681.00 -56.5 -55.3 -56.1 65 -99 SPO 1997 10 05 18 15 12 5.6 -9 681.00 -56.5 -55.3 -56.1 65 -99 SPO 1997 10 05 18 16 10 5.7 -9 681.10 -56.5 -55.2 -56.1 65 -99 SPO 1997 10 05 18 17 11 5.7 -9 681.10 -56.5 -55.2 -56.1 65 -99 SPO 1997 10 05 18 18 12 5.7 -9 681.00 -56.5 -55.1 -56.1 65 -99 SPO 1997 10 05 18 19 12 5.6 -9 681.00 -56.5 -55.1 -56.1 65 -99 SPO 1997 10 05 18 20 11 5.5 -9 681.00 -56.5 -55.0 -56.1 65 -99 SPO 1997 10 05 18 21 13 5.5 -9 681.10 -56.6 -55.0 -56.1 66 -99 SPO 1997 10 05 18 22 15 5.6 -9 681.10 -56.6 -55.0 -56.1 66 -99 SPO 1997 10 05 18 23 14 5.4 -9 681.10 -56.6 -55.2 -56.1 66 -99 SPO 1997 10 05 18 24 13 5.3 -9 681.10 -56.6 -55.2 -56.1 66 -99 SPO 1997 10 05 18 25 14 5.3 -9 681.10 -56.6 -55.2 -56.2 66 -99 SPO 1997 10 05 18 26 15 5.3 -9 681.10 -56.6 -55.2 -56.2 66 -99 SPO 1997 10 05 18 27 14 5.3 -9 681.10 -56.6 -55.2 -56.2 66 -99 SPO 1997 10 05 18 28 15 5.3 -9 681.10 -56.6 -55.3 -56.2 66 -99 SPO 1997 10 05 18 29 13 5.4 -9 681.10 -56.6 -55.2 -56.2 66 -99 SPO 1997 10 05 18 30 12 5.5 -9 681.10 -56.6 -55.2 -56.2 66 -99 SPO 1997 10 05 18 31 12 5.6 -9 681.10 -56.6 -55.2 -56.3 64 -99 SPO 1997 10 05 18 32 12 5.6 -9 681.10 -56.6 -55.2 -56.3 64 -99 SPO 1997 10 05 18 33 12 5.5 -9 681.10 -56.6 -55.3 -56.2 64 -99 SPO 1997 10 05 18 34 15 5.5 -9 681.10 -56.6 -55.3 -56.3 64 -99 SPO 1997 10 05 18 35 15 5.3 -9 681.10 -56.7 -55.4 -56.3 65 -99 SPO 1997 10 05 18 36 17 5.2 -9 681.10 -56.7 -55.4 -56.3 67 -99 SPO 1997 10 05 18 37 17 5.1 -9 681.10 -56.7 -55.5 -56.3 67 -99 SPO 1997 10 05 18 38 18 4.9 -9 681.10 -56.7 -55.6 -56.3 67 -99 SPO 1997 10 05 18 39 22 4.4 -9 681.10 -56.7 -55.7 -56.3 65 -99 SPO 1997 10 05 18 40 26 4.0 -9 681.10 -56.7 -56.0 -56.3 65 -99 SPO 1997 10 05 18 41 28 3.6 -9 681.10 -56.8 -56.1 -56.3 64 -99 SPO 1997 10 05 18 42 30 3.6 -9 681.10 -56.8 -56.2 -56.2 64 -99 SPO 1997 10 05 18 43 30 3.3 -9 681.10 -56.9 -56.4 -56.3 64 -99 SPO 1997 10 05 18 44 31 3.1 -9 681.10 -56.9 -56.4 -56.3 64 -99 SPO 1997 10 05 18 45 30 2.9 -9 681.10 -56.9 -56.5 -56.3 64 -99 SPO 1997 10 05 18 46 31 3.0 -9 681.20 -56.9 -56.5 -56.3 64 -99 SPO 1997 10 05 18 47 29 3.1 -9 681.10 -57.0 -56.5 -56.4 65 -99 SPO 1997 10 05 18 48 26 3.2 -9 681.10 -57.0 -56.5 -56.4 65 -99 SPO 1997 10 05 18 49 23 3.4 -9 681.20 -57.0 -56.4 -56.4 65 -99 SPO 1997 10 05 18 50 21 3.6 -9 681.20 -57.0 -56.3 -56.4 65 -99 SPO 1997 10 05 18 51 20 3.8 -9 681.20 -57.0 -56.2 -56.4 63 -99 SPO 1997 10 05 18 52 18 3.8 -9 681.20 -57.0 -56.0 -56.4 63 -99 SPO 1997 10 05 18 53 17 4.2 -9 681.20 -57.0 -56.0 -56.5 62 -99 SPO 1997 10 05 18 54 17 4.5 -9 681.10 -57.0 -55.8 -56.5 62 -99 SPO 1997 10 05 18 55 16 4.8 -9 681.10 -57.0 -55.8 -56.5 62 -99 SPO 1997 10 05 18 56 15 4.7 -9 681.10 -57.0 -55.8 -56.6 62 -99 SPO 1997 10 05 18 57 16 4.7 -9 681.10 -57.0 -55.8 -56.6 62 -99 SPO 1997 10 05 18 58 15 4.8 -9 681.10 -57.0 -55.8 -56.6 62 -99 SPO 1997 10 05 18 59 16 4.9 -9 681.10 -57.0 -55.9 -56.6 63 -99 SPO 1997 10 05 19 00 17 5.0 -9 681.10 -57.0 -56.0 -56.6 63 0 SPO 1997 10 05 19 01 18 5.0 -9 681.10 -57.0 -56.0 -56.6 63 -99 SPO 1997 10 05 19 02 17 5.0 -9 681.10 -57.1 -55.8 -56.7 64 -99 SPO 1997 10 05 19 03 17 4.9 -9 681.10 -57.0 -55.8 -56.7 62 -99 SPO 1997 10 05 19 04 16 4.9 -9 681.10 -57.0 -55.8 -56.7 62 -99 SPO 1997 10 05 19 05 13 5.0 -9 681.10 -57.1 -55.8 -56.7 63 -99 SPO 1997 10 05 19 06 14 5.2 -9 681.10 -57.1 -55.7 -56.7 63 -99 SPO 1997 10 05 19 07 15 5.3 -9 681.00 -57.0 -55.7 -56.7 63 -99 SPO 1997 10 05 19 08 13 5.3 -9 681.00 -57.1 -55.6 -56.8 64 -99 SPO 1997 10 05 19 09 13 5.3 -9 681.00 -57.1 -55.6 -56.8 64 -99 SPO 1997 10 05 19 10 16 5.4 -9 681.00 -57.0 -55.6 -56.8 63 -99 SPO 1997 10 05 19 11 16 5.2 -9 681.00 -57.1 -55.7 -56.8 64 -99 SPO 1997 10 05 19 12 14 5.1 -9 681.10 -57.1 -55.7 -56.8 64 -99 SPO 1997 10 05 19 13 13 5.0 -9 681.10 -57.1 -55.7 -56.8 64 -99 SPO 1997 10 05 19 14 14 5.1 -9 681.10 -57.1 -55.7 -56.8 63 -99 SPO 1997 10 05 19 15 13 5.0 -9 681.10 -57.1 -55.8 -56.8 63 -99 SPO 1997 10 05 19 16 14 4.9 -9 681.10 -57.2 -55.8 -56.9 63 -99 SPO 1997 10 05 19 17 15 4.8 -9 681.10 -57.2 -55.8 -56.9 63 -99 SPO 1997 10 05 19 18 15 4.8 -9 681.10 -57.2 -55.8 -56.9 63 -99 SPO 1997 10 05 19 19 13 5.0 -9 681.10 -57.2 -55.8 -56.9 63 -99 SPO 1997 10 05 19 20 13 5.3 -9 681.10 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 21 12 5.3 -9 681.00 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 22 9 5.3 -9 681.10 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 23 9 5.3 -9 681.10 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 24 11 5.2 -9 681.10 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 25 12 5.1 -9 681.10 -57.2 -55.8 -57.0 63 -99 SPO 1997 10 05 19 26 14 5.0 -9 681.10 -57.2 -55.9 -57.0 63 -99 SPO 1997 10 05 19 27 16 4.8 -9 681.10 -57.2 -55.9 -57.0 63 -99 SPO 1997 10 05 19 28 17 4.7 -9 681.10 -57.2 -55.9 -57.0 63 -99 SPO 1997 10 05 19 29 17 4.7 -9 681.10 -57.2 -55.9 -57.0 63 -99 SPO 1997 10 05 19 30 18 4.7 -9 681.10 -57.3 -56.0 -57.0 63 -99 SPO 1997 10 05 19 31 19 4.5 -9 681.20 -57.3 -56.0 -57.1 63 -99 SPO 1997 10 05 19 32 22 4.4 -9 681.20 -57.3 -56.1 -57.1 63 -99 SPO 1997 10 05 19 33 24 4.0 -9 681.20 -57.3 -56.1 -57.1 63 -99 SPO 1997 10 05 19 34 29 3.5 -9 681.20 -57.4 -56.2 -57.2 64 -99 SPO 1997 10 05 19 35 35 3.2 -9 681.20 -57.5 -56.6 -57.2 65 -99 SPO 1997 10 05 19 36 38 3.0 -9 681.20 -57.6 -56.7 -57.3 66 -99 SPO 1997 10 05 19 37 37 2.8 -9 681.30 -57.6 -56.8 -57.3 66 -99 SPO 1997 10 05 19 38 37 3.0 -9 681.30 -57.7 -56.8 -57.3 65 -99 SPO 1997 10 05 19 39 34 3.0 -9 681.20 -57.7 -56.7 -57.3 63 -99 SPO 1997 10 05 19 40 32 3.1 -9 681.20 -57.7 -56.6 -57.3 63 -99 SPO 1997 10 05 19 41 28 3.3 -9 681.30 -57.6 -56.4 -57.3 62 -99 SPO 1997 10 05 19 42 23 3.4 -9 681.30 -57.5 -56.3 -57.2 61 -99 SPO 1997 10 05 19 43 22 3.7 -9 681.40 -57.4 -56.2 -57.2 60 -99 SPO 1997 10 05 19 44 21 3.7 -9 681.30 -57.4 -56.2 -57.2 61 -99 SPO 1997 10 05 19 45 21 3.5 -9 681.30 -57.5 -56.2 -57.2 63 -99 SPO 1997 10 05 19 46 23 3.8 -9 681.30 -57.6 -56.2 -57.2 64 -99 SPO 1997 10 05 19 47 23 3.7 -9 681.30 -57.6 -56.3 -57.2 64 -99 SPO 1997 10 05 19 48 22 3.6 -9 681.30 -57.6 -56.3 -57.2 64 -99 SPO 1997 10 05 19 49 24 3.6 -9 681.30 -57.6 -56.3 -57.2 63 -99 SPO 1997 10 05 19 50 25 3.7 -9 681.30 -57.6 -56.3 -57.2 63 -99 SPO 1997 10 05 19 51 24 3.7 -9 681.30 -57.6 -56.4 -57.3 62 -99 SPO 1997 10 05 19 52 26 3.6 -9 681.40 -57.6 -56.3 -57.2 62 -99 SPO 1997 10 05 19 53 26 3.5 -9 681.40 -57.6 -56.4 -57.2 60 -99 SPO 1997 10 05 19 54 26 3.3 -9 681.40 -57.5 -56.4 -57.2 61 -99 SPO 1997 10 05 19 55 25 3.2 -9 681.40 -57.6 -56.4 -57.2 62 -99 SPO 1997 10 05 19 56 23 3.2 -9 681.40 -57.6 -56.5 -57.2 63 -99 SPO 1997 10 05 19 57 21 3.3 -9 681.40 -57.5 -56.4 -57.2 62 -99 SPO 1997 10 05 19 58 20 3.3 -9 681.40 -57.6 -56.4 -57.2 63 -99 SPO 1997 10 05 19 59 22 3.3 -9 681.40 -57.6 -56.4 -57.2 63 -99 SPO 1997 10 05 20 00 28 3.4 -9 681.40 -57.6 -56.5 -57.3 63 0 SPO 1997 10 05 20 01 31 3.3 -9 681.40 -57.6 -56.4 -57.3 63 -99 SPO 1997 10 05 20 02 32 3.1 -9 681.40 -57.7 -56.6 -57.3 63 -99 SPO 1997 10 05 20 03 30 3.1 -9 681.40 -57.6 -56.6 -57.3 62 -99 SPO 1997 10 05 20 04 26 3.0 -9 681.40 -57.7 -56.6 -57.3 63 -99 SPO 1997 10 05 20 05 24 2.8 -9 681.40 -57.7 -56.5 -57.3 63 -99 SPO 1997 10 05 20 06 27 2.8 -9 681.40 -57.8 -56.5 -57.4 63 -99 SPO 1997 10 05 20 07 32 2.8 -9 681.40 -57.8 -56.5 -57.4 63 -99 SPO 1997 10 05 20 08 32 2.6 -9 681.40 -57.9 -56.6 -57.5 64 -99 SPO 1997 10 05 20 09 33 2.5 -9 681.40 -58.0 -56.6 -57.6 63 -99 SPO 1997 10 05 20 10 35 2.4 -9 681.40 -58.1 -56.6 -57.6 64 -99 SPO 1997 10 05 20 11 34 2.5 -9 681.40 -58.1 -56.6 -57.6 64 -99 SPO 1997 10 05 20 12 36 2.8 -9 681.40 -58.1 -56.6 -57.6 62 -99 SPO 1997 10 05 20 13 37 2.8 -9 681.30 -58.0 -56.6 -57.6 61 -99 SPO 1997 10 05 20 14 39 2.8 -9 681.40 -58.0 -56.6 -57.6 61 -99 SPO 1997 10 05 20 15 43 2.6 -9 681.40 -58.0 -56.7 -57.6 61 -99 SPO 1997 10 05 20 16 45 2.7 -9 681.40 -57.9 -56.7 -57.6 60 -99 SPO 1997 10 05 20 17 43 2.9 -9 681.40 -57.9 -56.7 -57.6 60 -99 SPO 1997 10 05 20 18 37 3.0 -9 681.40 -57.8 -56.5 -57.5 62 -99 SPO 1997 10 05 20 19 34 2.9 -9 681.40 -57.8 -56.4 -57.5 62 -99 SPO 1997 10 05 20 20 34 3.1 -9 681.40 -57.8 -56.4 -57.5 62 -99 SPO 1997 10 05 20 21 38 3.0 -9 681.40 -57.9 -56.4 -57.5 62 -99 SPO 1997 10 05 20 22 42 2.7 -9 681.40 -57.9 -56.6 -57.6 62 -99 SPO 1997 10 05 20 23 45 2.5 -9 681.50 -58.0 -56.8 -57.7 62 -99 SPO 1997 10 05 20 24 51 2.3 -9 681.50 -58.2 -56.9 -57.7 62 -99 SPO 1997 10 05 20 25 54 2.1 -9 681.50 -58.6 -57.0 -57.8 64 -99 SPO 1997 10 05 20 26 52 2.2 -9 681.50 -58.5 -57.0 -57.9 63 -99 SPO 1997 10 05 20 27 45 2.4 -9 681.50 -58.2 -56.8 -57.8 59 -99 SPO 1997 10 05 20 28 42 2.6 -9 681.50 -58.2 -56.6 -57.8 59 -99 SPO 1997 10 05 20 29 39 2.8 -9 681.50 -58.0 -56.4 -57.7 59 -99 SPO 1997 10 05 20 30 39 3.0 -9 681.50 -58.0 -56.4 -57.7 61 -99 SPO 1997 10 05 20 31 43 3.0 -9 681.50 -58.0 -56.5 -57.7 61 -99 SPO 1997 10 05 20 32 49 2.9 -9 681.50 -58.3 -56.6 -57.8 63 -99 SPO 1997 10 05 20 33 52 2.9 -9 681.50 -58.8 -56.7 -58.1 67 -99 SPO 1997 10 05 20 34 50 2.9 -9 681.50 -59.0 -56.7 -58.2 67 -99 SPO 1997 10 05 20 35 45 3.1 -9 681.60 -58.6 -56.6 -58.1 62 -99 SPO 1997 10 05 20 36 41 3.1 -9 681.60 -58.4 -56.4 -58.0 60 -99 SPO 1997 10 05 20 37 38 3.2 -9 681.60 -58.4 -56.4 -58.0 60 -99 SPO 1997 10 05 20 38 40 3.0 -9 681.60 -58.4 -56.3 -58.1 60 -99 SPO 1997 10 05 20 39 43 2.8 -9 681.60 -58.6 -56.4 -58.2 62 -99 SPO 1997 10 05 20 40 42 2.5 -9 681.70 -59.0 -56.5 -58.3 65 -99 SPO 1997 10 05 20 41 43 2.4 -9 681.70 -59.4 -56.6 -58.4 68 -99 SPO 1997 10 05 20 42 50 2.1 -9 681.80 -59.5 -56.7 -58.5 67 -99 SPO 1997 10 05 20 43 61 1.8 -9 681.80 -59.5 -56.8 -58.5 65 -99 SPO 1997 10 05 20 44 62 1.7 -9 681.70 -59.8 -56.9 -58.8 67 -99 SPO 1997 10 05 20 45 57 2.0 -9 681.70 -60.1 -56.8 -59.0 68 -99 SPO 1997 10 05 20 46 56 2.1 -9 681.70 -60.2 -56.7 -59.2 66 -99 SPO 1997 10 05 20 47 60 2.3 -9 681.70 -60.4 -56.7 -59.3 66 -99 SPO 1997 10 05 20 48 64 2.7 -9 681.70 -60.4 -56.9 -59.4 64 -99 SPO 1997 10 05 20 49 64 2.7 -9 681.70 -60.4 -57.0 -59.6 63 -99 SPO 1997 10 05 20 50 64 2.7 -9 681.80 -60.4 -57.1 -59.6 63 -99 SPO 1997 10 05 20 51 68 2.8 -9 681.70 -60.3 -57.0 -59.6 60 -99 SPO 1997 10 05 20 52 69 2.9 -9 681.70 -60.3 -57.1 -59.7 60 -99 SPO 1997 10 05 20 53 70 3.0 -9 681.70 -60.3 -57.1 -59.7 60 -99 SPO 1997 10 05 20 54 70 3.3 -9 681.70 -60.3 -57.2 -59.7 60 -99 SPO 1997 10 05 20 55 69 3.4 -9 681.70 -60.3 -57.2 -59.8 60 -99 SPO 1997 10 05 20 56 68 3.3 -9 681.70 -60.3 -57.2 -59.8 60 -99 SPO 1997 10 05 20 57 65 3.2 -9 681.70 -60.3 -57.0 -59.8 60 -99 SPO 1997 10 05 20 58 64 3.5 -9 681.70 -60.3 -56.9 -59.8 60 -99 SPO 1997 10 05 20 59 66 3.6 -9 681.70 -60.3 -56.9 -59.9 60 -99 SPO 1997 10 05 21 00 66 3.6 -9 681.70 -60.3 -56.9 -59.9 60 0 SPO 1997 10 05 21 01 65 3.7 -9 681.70 -60.3 -56.9 -59.9 60 -99 SPO 1997 10 05 21 02 65 3.6 -9 681.70 -60.3 -57.0 -59.9 60 -99 SPO 1997 10 05 21 03 65 3.6 -9 681.70 -60.3 -57.0 -59.9 60 -99 SPO 1997 10 05 21 04 63 3.5 -9 681.80 -60.2 -57.0 -59.9 60 -99 SPO 1997 10 05 21 05 60 3.5 -9 681.80 -60.2 -57.2 -59.9 61 -99 SPO 1997 10 05 21 06 59 3.5 -9 681.80 -60.1 -57.0 -59.8 61 -99 SPO 1997 10 05 21 07 59 3.6 -9 681.80 -60.1 -56.9 -59.8 61 -99 SPO 1997 10 05 21 08 61 3.7 -9 681.80 -60.0 -56.9 -59.8 60 -99 SPO 1997 10 05 21 09 60 3.8 -9 681.80 -60.0 -56.8 -59.8 60 -99 SPO 1997 10 05 21 10 60 3.8 -9 681.80 -60.0 -56.9 -59.8 60 -99 SPO 1997 10 05 21 11 59 3.5 -9 681.80 -60.0 -56.8 -59.8 60 -99 SPO 1997 10 05 21 12 57 3.3 -9 681.80 -60.0 -56.8 -59.8 60 -99 SPO 1997 10 05 21 13 58 3.1 -9 681.80 -60.0 -56.8 -59.7 60 -99 SPO 1997 10 05 21 14 61 3.0 -9 681.80 -60.0 -56.8 -59.7 60 -99 SPO 1997 10 05 21 15 59 3.2 -9 681.80 -60.0 -56.9 -59.7 60 -99 SPO 1997 10 05 21 16 56 3.2 -9 681.80 -60.0 -56.8 -59.7 63 -99 SPO 1997 10 05 21 17 58 3.0 -9 681.80 -60.0 -57.0 -59.7 63 -99 SPO 1997 10 05 21 18 59 3.0 -9 681.80 -60.0 -57.1 -59.7 63 -99 SPO 1997 10 05 21 19 64 2.9 -9 681.90 -60.0 -57.1 -59.6 63 -99 SPO 1997 10 05 21 20 64 3.0 -9 681.90 -60.0 -57.2 -59.6 63 -99 SPO 1997 10 05 21 21 60 3.1 -9 681.90 -59.9 -57.0 -59.6 62 -99 SPO 1997 10 05 21 22 59 3.1 -9 681.90 -59.9 -56.9 -59.6 62 -99 SPO 1997 10 05 21 23 60 3.1 -9 681.90 -59.8 -57.0 -59.6 61 -99 SPO 1997 10 05 21 24 59 3.1 -9 682.00 -59.8 -57.0 -59.5 61 -99 SPO 1997 10 05 21 25 58 3.0 -9 682.00 -59.7 -56.9 -59.4 60 -99 SPO 1997 10 05 21 26 52 3.0 -9 682.00 -59.7 -56.8 -59.4 60 -99 SPO 1997 10 05 21 27 56 3.0 -9 682.00 -59.6 -56.8 -59.4 60 -99 SPO 1997 10 05 21 28 62 3.1 -9 682.00 -59.6 -56.8 -59.3 61 -99 SPO 1997 10 05 21 29 64 3.1 -9 682.00 -59.5 -57.0 -59.3 61 -99 SPO 1997 10 05 21 30 65 3.2 -9 682.00 -59.5 -57.0 -59.3 61 -99 SPO 1997 10 05 21 31 67 3.3 -9 682.00 -59.4 -57.2 -59.2 62 -99 SPO 1997 10 05 21 32 67 3.2 -9 682.10 -59.4 -57.3 -59.2 62 -99 SPO 1997 10 05 21 33 70 3.3 -9 682.10 -59.4 -57.4 -59.2 62 -99 SPO 1997 10 05 21 34 72 3.2 -9 682.10 -59.3 -57.5 -59.2 63 -99 SPO 1997 10 05 21 35 70 2.9 -9 682.10 -59.3 -57.4 -59.1 63 -99 SPO 1997 10 05 21 36 73 2.8 -9 682.20 -59.2 -57.4 -59.0 62 -99 SPO 1997 10 05 21 37 73 2.8 -9 682.20 -59.2 -57.5 -59.0 62 -99 SPO 1997 10 05 21 38 75 2.8 -9 682.30 -59.1 -57.5 -58.9 61 -99 SPO 1997 10 05 21 39 72 2.6 -9 682.30 -59.1 -57.4 -58.9 61 -99 SPO 1997 10 05 21 40 68 3.1 -9 682.30 -59.0 -57.1 -58.8 61 -99 SPO 1997 10 05 21 41 71 3.0 -9 682.30 -59.0 -57.2 -58.8 63 -99 SPO 1997 10 05 21 42 70 3.0 -9 682.30 -58.9 -56.9 -58.7 64 -99 SPO 1997 10 05 21 43 71 3.0 -9 682.30 -58.9 -56.9 -58.7 64 -99 SPO 1997 10 05 21 44 74 2.8 -9 682.30 -58.8 -56.8 -58.7 63 -99 SPO 1997 10 05 21 45 79 3.0 -9 682.30 -58.7 -56.8 -58.6 62 -99 SPO 1997 10 05 21 46 78 3.0 -9 682.40 -58.7 -57.0 -58.5 63 -99 SPO 1997 10 05 21 47 78 2.9 -9 682.40 -58.6 -57.5 -58.5 62 -99 SPO 1997 10 05 21 48 81 2.7 -9 682.40 -58.6 -57.6 -58.4 62 -99 SPO 1997 10 05 21 49 85 2.9 -9 682.40 -58.5 -57.8 -58.4 63 -99 SPO 1997 10 05 21 50 84 3.2 -9 682.40 -58.5 -57.9 -58.3 63 -99 SPO 1997 10 05 21 51 82 3.1 -9 682.40 -58.5 -58.2 -58.4 63 -99 SPO 1997 10 05 21 52 83 3.3 -9 682.40 -58.4 -58.1 -58.4 62 -99 SPO 1997 10 05 21 53 85 2.9 -9 682.40 -58.4 -58.3 -58.3 64 -99 SPO 1997 10 05 21 54 81 3.0 -9 682.40 -58.3 -58.4 -58.2 63 -99 SPO 1997 10 05 21 55 79 2.8 -9 682.40 -58.3 -58.4 -58.2 63 -99 SPO 1997 10 05 21 56 81 2.7 -9 682.50 -58.2 -58.3 -58.2 63 -99 SPO 1997 10 05 21 57 82 2.8 -9 682.50 -58.2 -58.3 -58.2 65 -99 SPO 1997 10 05 21 58 81 3.0 -9 682.40 -58.2 -58.3 -58.2 65 -99 SPO 1997 10 05 21 59 79 2.9 -9 682.40 -58.2 -58.4 -58.1 62 -99 SPO 1997 10 05 22 00 82 2.7 -9 682.40 -58.2 -58.4 -58.1 62 0 SPO 1997 10 05 22 01 84 2.7 -9 682.50 -58.1 -58.4 -58.0 62 -99 SPO 1997 10 05 22 02 85 2.8 -9 682.50 -58.2 -58.5 -58.0 62 -99 SPO 1997 10 05 22 03 85 2.8 -9 682.50 -58.2 -58.4 -58.0 65 -99 SPO 1997 10 05 22 04 86 2.5 -9 682.50 -58.2 -58.4 -58.0 65 -99 SPO 1997 10 05 22 05 85 2.1 -9 682.60 -58.2 -58.4 -58.0 65 -99 SPO 1997 10 05 22 06 85 2.3 -9 682.60 -58.1 -58.4 -57.9 64 -99 SPO 1997 10 05 22 07 85 1.9 -9 682.60 -58.1 -58.3 -57.9 64 -99 SPO 1997 10 05 22 08 87 2.2 -9 682.60 -58.1 -58.3 -58.0 64 -99 SPO 1997 10 05 22 09 89 2.2 -9 682.60 -58.1 -58.3 -58.0 64 -99 SPO 1997 10 05 22 10 89 2.3 -9 682.60 -58.1 -58.2 -57.9 64 -99 SPO 1997 10 05 22 11 88 2.4 -9 682.60 -58.1 -58.2 -57.9 -99 -99 SPO 1997 10 05 22 12 89 2.3 -9 682.60 -58.1 -58.1 -57.9 -99 -99 SPO 1997 10 05 22 13 91 2.0 -9 682.60 -58.0 -58.2 -57.8 -99 -99 SPO 1997 10 05 22 14 92 2.1 -9 682.60 -58.0 -58.2 -57.8 -99 -99 SPO 1997 10 05 22 15 97 2.1 -9 682.60 -58.0 -58.1 -57.8 -99 -99 SPO 1997 10 05 22 16 94 2.5 -9 682.60 -58.0 -58.1 -57.8 -99 -99 SPO 1997 10 05 22 17 88 2.6 -9 682.50 -58.0 -58.0 -57.8 -99 -99 SPO 1997 10 05 22 18 81 2.4 -9 682.50 -57.8 -57.8 -57.8 -99 -99 SPO 1997 10 05 22 19 80 2.3 -9 682.60 -57.9 -57.9 -57.8 -99 -99 SPO 1997 10 05 22 20 75 2.2 -9 682.60 -57.9 -57.9 -57.8 -99 -99 SPO 1997 10 05 22 21 76 2.2 -9 682.60 -57.9 -57.9 -57.8 -99 -99 SPO 1997 10 05 22 22 76 2.2 -9 682.60 -57.9 -57.9 -57.8 -99 -99 SPO 1997 10 05 22 23 73 1.9 -9 682.60 -57.9 -57.9 -57.8 -99 -99 SPO 1997 10 05 22 24 69 1.8 -9 682.70 -57.9 -58.0 -57.8 -99 -99 SPO 1997 10 05 22 25 69 1.9 -9 682.60 -57.9 -57.9 -57.8 62 -99 SPO 1997 10 05 22 26 69 1.7 -9 682.60 -57.9 -57.9 -57.8 62 -99 SPO 1997 10 05 22 27 71 2.0 -9 682.70 -57.9 -57.9 -57.8 64 -99 SPO 1997 10 05 22 28 71 2.2 -9 682.60 -57.9 -57.9 -57.8 64 -99 SPO 1997 10 05 22 29 70 2.1 -9 682.60 -57.9 -57.9 -57.8 64 -99 SPO 1997 10 05 22 30 71 2.1 -9 682.60 -57.9 -58.0 -57.8 64 -99 SPO 1997 10 05 22 31 72 2.2 -9 682.60 -57.9 -58.0 -57.8 64 -99 SPO 1997 10 05 22 32 67 2.1 -9 682.60 -57.9 -58.0 -57.8 65 -99 SPO 1997 10 05 22 33 63 1.9 -9 682.60 -57.9 -57.9 -57.8 64 -99 SPO 1997 10 05 22 34 64 2.1 -9 682.60 -57.9 -57.8 -57.8 64 -99 SPO 1997 10 05 22 35 60 2.0 -9 682.60 -57.9 -57.9 -57.8 62 -99 SPO 1997 10 05 22 36 58 1.9 -9 682.70 -57.9 -58.0 -57.8 62 -99 SPO 1997 10 05 22 37 54 1.9 -9 682.70 -57.9 -58.0 -57.8 62 -99 SPO 1997 10 05 22 38 56 2.5 -9 682.60 -57.9 -57.9 -57.8 62 -99 SPO 1997 10 05 22 39 56 2.5 -9 682.60 -57.9 -57.8 -57.8 62 -99 SPO 1997 10 05 22 40 53 2.1 -9 682.60 -57.9 -57.8 -57.8 62 -99 SPO 1997 10 05 22 41 54 2.3 -9 682.70 -57.9 -57.8 -57.8 64 -99 SPO 1997 10 05 22 42 54 2.3 -9 682.70 -57.9 -57.8 -57.8 64 -99 SPO 1997 10 05 22 43 56 2.2 -9 682.70 -57.8 -57.7 -57.8 62 -99 SPO 1997 10 05 22 44 61 2.5 -9 682.70 -57.8 -57.7 -57.8 63 -99 SPO 1997 10 05 22 45 60 2.5 -9 682.70 -57.8 -57.8 -57.8 63 -99 SPO 1997 10 05 22 46 63 2.4 -9 682.70 -57.8 -57.8 -57.8 62 -99 SPO 1997 10 05 22 47 65 2.4 -9 682.70 -57.8 -57.8 -57.8 62 -99 SPO 1997 10 05 22 48 65 2.2 -9 682.70 -57.8 -57.6 -57.7 62 -99 SPO 1997 10 05 22 49 66 2.3 -9 682.70 -57.8 -57.6 -57.7 62 -99 SPO 1997 10 05 22 50 63 2.5 -9 682.70 -57.8 -57.6 -57.8 60 -99 SPO 1997 10 05 22 51 63 2.5 -9 682.60 -57.8 -57.4 -57.8 62 -99 SPO 1997 10 05 22 52 61 2.4 -9 682.70 -57.8 -57.4 -57.7 62 -99 SPO 1997 10 05 22 53 57 2.6 -9 682.70 -57.8 -57.3 -57.7 62 -99 SPO 1997 10 05 22 54 60 2.6 -9 682.70 -57.8 -57.2 -57.7 63 -99 SPO 1997 10 05 22 55 64 2.9 -9 682.70 -57.7 -57.0 -57.7 63 -99 SPO 1997 10 05 22 56 58 3.0 -9 682.60 -57.7 -57.0 -57.7 63 -99 SPO 1997 10 05 22 57 54 3.1 -9 682.60 -57.7 -56.8 -57.7 63 -99 SPO 1997 10 05 22 58 54 3.2 -9 682.60 -57.7 -56.8 -57.7 61 -99 SPO 1997 10 05 22 59 53 3.2 -9 682.60 -57.7 -56.8 -57.6 61 -99 SPO 1997 10 05 23 00 55 3.3 -9 682.60 -57.7 -56.7 -57.6 61 0 SPO 1997 10 05 23 01 54 3.2 -9 682.60 -57.6 -56.6 -57.6 60 -99 SPO 1997 10 05 23 02 53 3.1 -9 682.60 -57.6 -56.6 -57.6 60 -99 SPO 1997 10 05 23 03 50 3.1 -9 682.60 -57.6 -56.6 -57.6 62 -99 SPO 1997 10 05 23 04 53 3.1 -9 682.60 -57.6 -56.7 -57.6 63 -99 SPO 1997 10 05 23 05 49 3.1 -9 682.60 -57.6 -56.4 -57.5 64 -99 SPO 1997 10 05 23 06 49 2.8 -9 682.60 -57.5 -56.4 -57.5 63 -99 SPO 1997 10 05 23 07 47 2.5 -9 682.60 -57.5 -56.4 -57.5 63 -99 SPO 1997 10 05 23 08 47 1.9 -9 682.70 -57.4 -56.4 -57.4 63 -99 SPO 1997 10 05 23 09 50 2.1 -9 682.70 -57.4 -56.5 -57.4 63 -99 SPO 1997 10 05 23 10 45 2.0 -9 682.70 -57.4 -56.4 -57.3 63 -99 SPO 1997 10 05 23 11 43 2.0 -9 682.70 -57.3 -56.5 -57.3 62 -99 SPO 1997 10 05 23 12 41 2.0 -9 682.70 -57.3 -56.5 -57.3 62 -99 SPO 1997 10 05 23 13 43 2.1 -9 682.60 -57.3 -56.6 -57.2 62 -99 SPO 1997 10 05 23 14 49 2.5 -9 682.60 -57.2 -56.6 -57.2 63 -99 SPO 1997 10 05 23 15 48 2.4 -9 682.60 -57.2 -56.6 -57.1 63 -99 SPO 1997 10 05 23 16 47 2.2 -9 682.60 -57.1 -56.6 -57.1 62 -99 SPO 1997 10 05 23 17 46 2.1 -9 682.60 -57.1 -56.5 -57.0 63 -99 SPO 1997 10 05 23 18 43 2.0 -9 682.70 -57.0 -56.5 -57.0 62 -99 SPO 1997 10 05 23 19 44 1.9 -9 682.70 -57.0 -56.5 -57.0 62 -99 SPO 1997 10 05 23 20 48 1.6 -9 682.70 -57.0 -56.5 -57.0 63 -99 SPO 1997 10 05 23 21 55 1.4 -9 682.80 -56.9 -56.5 -56.9 63 -99 SPO 1997 10 05 23 22 59 1.8 -9 682.80 -56.9 -56.6 -56.9 63 -99 SPO 1997 10 05 23 23 59 2.2 -9 682.70 -56.8 -56.6 -56.9 62 -99 SPO 1997 10 05 23 24 54 2.8 -9 682.60 -56.8 -56.5 -56.8 62 -99 SPO 1997 10 05 23 25 47 2.8 -9 682.60 -56.8 -56.3 -56.8 62 -99 SPO 1997 10 05 23 26 44 2.6 -9 682.60 -56.8 -56.0 -56.8 62 -99 SPO 1997 10 05 23 27 46 2.8 -9 682.60 -56.8 -56.0 -56.8 64 -99 SPO 1997 10 05 23 28 47 2.9 -9 682.60 -56.8 -56.0 -56.8 64 -99 SPO 1997 10 05 23 29 45 2.9 -9 682.60 -56.7 -56.0 -56.7 63 -99 SPO 1997 10 05 23 30 47 2.8 -9 682.60 -56.7 -56.2 -56.7 63 -99 SPO 1997 10 05 23 31 47 2.6 -9 682.60 -56.6 -56.4 -56.6 63 -99 SPO 1997 10 05 23 32 46 2.5 -9 682.70 -56.6 -56.5 -56.6 64 -99 SPO 1997 10 05 23 33 44 2.7 -9 682.60 -56.6 -56.4 -56.6 64 -99 SPO 1997 10 05 23 34 44 2.8 -9 682.60 -56.5 -56.4 -56.6 64 -99 SPO 1997 10 05 23 35 35 2.5 -9 682.70 -56.5 -56.4 -56.5 64 -99 SPO 1997 10 05 23 36 32 2.4 -9 682.80 -56.4 -56.5 -56.4 63 -99 SPO 1997 10 05 23 37 31 2.7 -9 682.70 -56.3 -56.3 -56.4 62 -99 SPO 1997 10 05 23 38 28 2.7 -9 682.60 -56.3 -56.2 -56.3 62 -99 SPO 1997 10 05 23 39 28 3.0 -9 682.60 -56.2 -56.2 -56.2 61 -99 SPO 1997 10 05 23 40 28 3.0 -9 682.50 -56.1 -56.2 -56.2 62 -99 SPO 1997 10 05 23 41 26 2.9 -9 682.50 -56.0 -56.1 -56.1 62 -99 SPO 1997 10 05 23 42 27 3.1 -9 682.50 -55.9 -56.1 -56.0 61 -99 SPO 1997 10 05 23 43 25 3.0 -9 682.50 -55.8 -56.1 -56.0 62 -99 SPO 1997 10 05 23 44 23 3.2 -9 682.50 -55.8 -56.1 -55.9 64 -99 SPO 1997 10 05 23 45 22 3.5 -9 682.50 -55.6 -56.0 -55.8 62 -99 SPO 1997 10 05 23 46 18 3.6 -9 682.50 -55.6 -56.0 -55.7 62 -99 SPO 1997 10 05 23 47 18 3.7 -9 682.50 -55.5 -55.9 -55.6 62 -99 SPO 1997 10 05 23 48 16 3.5 -9 682.40 -55.6 -55.8 -55.6 65 -99 SPO 1997 10 05 23 49 16 3.7 -9 682.40 -55.4 -55.7 -55.4 63 -99 SPO 1997 10 05 23 50 16 3.9 -9 682.40 -55.3 -55.7 -55.4 64 -99 SPO 1997 10 05 23 51 14 3.6 -9 682.50 -55.2 -55.7 -55.3 63 -99 SPO 1997 10 05 23 52 17 3.6 -9 682.50 -55.2 -55.6 -55.3 64 -99 SPO 1997 10 05 23 53 21 3.6 -9 682.50 -55.2 -55.6 -55.3 64 -99 SPO 1997 10 05 23 54 22 3.7 -9 682.50 -55.1 -55.6 -55.2 65 -99 SPO 1997 10 05 23 55 20 3.6 -9 682.40 -55.1 -55.5 -55.2 65 -99 SPO 1997 10 05 23 56 21 3.8 -9 682.40 -55.0 -55.4 -55.1 64 -99 SPO 1997 10 05 23 57 20 3.8 -9 682.40 -54.9 -55.4 -55.0 63 -99 SPO 1997 10 05 23 58 15 3.8 -9 682.40 -54.9 -55.3 -55.0 -99 -99 SPO 1997 10 05 23 59 19 3.7 -9 682.50 -54.9 -55.3 -55.0 -99 -99 SPO 1997 10 06 00 00 21 3.3 -9 682.50 -54.8 -55.3 -54.9 -99 0 SPO 1997 10 06 00 01 21 3.3 -9 682.50 -54.8 -55.2 -54.9 -99 -99 SPO 1997 10 06 00 02 19 3.5 -9 682.50 -54.8 -55.2 -54.9 -99 -99 SPO 1997 10 06 00 03 21 3.6 -9 682.50 -54.7 -55.1 -54.8 64 -99 SPO 1997 10 06 00 04 18 3.7 -9 682.50 -54.7 -55.1 -54.8 65 -99 SPO 1997 10 06 00 05 17 3.5 -9 682.50 -54.6 -55.0 -54.6 65 -99 SPO 1997 10 06 00 06 14 3.5 -9 682.50 -54.5 -55.0 -54.6 65 -99 SPO 1997 10 06 00 07 11 3.5 -9 682.50 -54.5 -54.9 -54.6 65 -99 SPO 1997 10 06 00 08 7 3.1 -9 682.50 -54.4 -54.8 -54.5 64 -99 SPO 1997 10 06 00 09 4 3.3 -9 682.60 -54.4 -54.8 -54.5 64 -99 SPO 1997 10 06 00 10 7 3.7 -9 682.50 -54.5 -54.9 -54.6 66 -99 SPO 1997 10 06 00 11 10 4.0 -9 682.40 -54.4 -54.8 -54.6 66 -99 SPO 1997 10 06 00 12 11 4.0 -9 682.40 -54.4 -54.8 -54.5 64 -99 SPO 1997 10 06 00 13 15 4.2 -9 682.40 -54.4 -54.8 -54.4 64 -99 SPO 1997 10 06 00 14 14 4.0 -9 682.40 -54.4 -54.8 -54.4 66 -99 SPO 1997 10 06 00 15 12 4.2 -9 682.30 -54.3 -54.8 -54.4 66 -99 SPO 1997 10 06 00 16 15 4.2 -9 682.30 -54.4 -54.7 -54.4 67 -99 SPO 1997 10 06 00 17 14 3.9 -9 682.30 -54.3 -54.8 -54.4 67 -99 SPO 1997 10 06 00 18 19 4.1 -9 682.30 -54.2 -54.7 -54.3 66 -99 SPO 1997 10 06 00 19 20 3.9 -9 682.40 -54.3 -54.7 -54.3 67 -99 SPO 1997 10 06 00 20 17 3.4 -9 682.40 -54.2 -54.6 -54.3 66 -99 SPO 1997 10 06 00 21 15 3.3 -9 682.40 -54.2 -54.6 -54.2 66 -99 SPO 1997 10 06 00 22 12 3.8 -9 682.40 -54.2 -54.5 -54.3 66 -99 SPO 1997 10 06 00 23 12 3.6 -9 682.40 -54.2 -54.5 -54.2 65 -99 SPO 1997 10 06 00 24 12 3.5 -9 682.40 -54.2 -54.5 -54.2 66 -99 SPO 1997 10 06 00 25 7 3.4 -9 682.50 -54.2 -54.5 -54.2 66 -99 SPO 1997 10 06 00 26 2 2.8 -9 682.60 -54.1 -54.5 -54.2 66 -99 SPO 1997 10 06 00 27 352 2.3 -9 682.60 -54.1 -54.5 -54.1 67 -99 SPO 1997 10 06 00 28 355 3.1 -9 682.60 -54.1 -54.5 -54.1 67 -99 SPO 1997 10 06 00 29 358 4.0 -9 682.40 -54.1 -54.5 -54.1 68 -99 SPO 1997 10 06 00 30 360 3.5 -9 682.40 -54.0 -54.5 -54.0 68 -99 SPO 1997 10 06 00 31 354 2.1 -9 682.60 -54.0 -54.6 -54.0 68 -99 SPO 1997 10 06 00 32 352 1.8 -9 682.70 -54.0 -54.5 -54.0 67 -99 SPO 1997 10 06 00 33 356 3.2 -9 682.60 -54.2 -54.5 -54.1 69 -99 SPO 1997 10 06 00 34 356 3.2 -9 682.50 -54.2 -54.5 -54.2 68 -99 SPO 1997 10 06 00 35 355 2.5 -9 682.60 -54.1 -54.5 -54.1 66 -99 SPO 1997 10 06 00 36 358 2.7 -9 682.60 -54.2 -54.6 -54.1 66 -99 SPO 1997 10 06 00 37 360 3.0 -9 682.50 -54.2 -54.5 -54.1 65 -99 SPO 1997 10 06 00 38 3 3.5 -9 682.50 -54.2 -54.5 -54.2 65 -99 SPO 1997 10 06 00 39 0 3.3 -9 682.50 -54.2 -54.5 -54.2 65 -99 SPO 1997 10 06 00 40 3 3.4 -9 682.50 -54.1 -54.5 -54.1 64 -99 SPO 1997 10 06 00 41 11 3.7 -9 682.40 -54.1 -54.4 -54.1 64 -99 SPO 1997 10 06 00 42 12 3.7 -9 682.40 -54.1 -54.4 -54.1 64 -99 SPO 1997 10 06 00 43 15 3.5 -9 682.40 -54.1 -54.4 -54.0 64 -99 SPO 1997 10 06 00 44 14 3.0 -9 682.50 -54.0 -54.4 -54.0 63 -99 SPO 1997 10 06 00 45 12 2.7 -9 682.60 -53.9 -54.4 -53.9 62 -99 SPO 1997 10 06 00 46 13 2.8 -9 682.60 -53.9 -54.3 -53.9 62 -99 SPO 1997 10 06 00 47 15 3.1 -9 682.50 -53.9 -54.3 -53.9 63 -99 SPO 1997 10 06 00 48 10 3.6 -9 682.50 -53.9 -54.2 -53.9 63 -99 SPO 1997 10 06 00 49 359 3.3 -9 682.50 -53.8 -54.2 -53.8 63 -99 SPO 1997 10 06 00 50 354 2.6 -9 682.70 -53.8 -54.1 -53.8 64 -99 SPO 1997 10 06 00 51 350 2.1 -9 682.70 -53.7 -54.1 -53.7 63 -99 SPO 1997 10 06 00 52 350 2.7 -9 682.60 -53.7 -54.0 -53.7 64 -99 SPO 1997 10 06 00 53 347 3.1 -9 682.60 -53.7 -54.0 -53.7 64 -99 SPO 1997 10 06 00 54 348 3.0 -9 682.60 -53.7 -54.0 -53.7 64 -99 SPO 1997 10 06 00 55 353 3.5 -9 682.60 -53.7 -54.0 -53.7 65 -99 SPO 1997 10 06 00 56 359 4.1 -9 682.50 -53.7 -54.0 -53.7 64 -99 SPO 1997 10 06 00 57 358 3.8 -9 682.50 -53.6 -54.0 -53.7 63 -99 SPO 1997 10 06 00 58 357 3.5 -9 682.50 -53.6 -54.0 -53.6 64 -99 SPO 1997 10 06 00 59 352 2.4 -9 682.70 -53.6 -53.9 -53.6 65 -99 SPO 1997 10 06 01 00 -999 -99.9 -9 683.10 -53.5 -53.9 -53.5 64 0 SPO 1997 10 06 01 01 -999 -99.9 -9 683.30 -53.4 -53.9 -53.4 64 -99 SPO 1997 10 06 01 02 -999 -99.9 -9 683.00 -53.4 -53.9 -53.4 64 -99 SPO 1997 10 06 01 03 -999 -99.9 -9 682.90 -53.5 -53.9 -53.4 65 -99 SPO 1997 10 06 01 04 -999 -99.9 -9 683.20 -53.5 -53.9 -53.4 66 -99 SPO 1997 10 06 01 05 -999 -99.9 -9 683.20 -53.5 -53.9 -53.3 67 -99 SPO 1997 10 06 01 06 -999 -99.9 -9 683.20 -53.5 -53.8 -53.2 67 -99 SPO 1997 10 06 01 07 -999 -99.9 -9 683.20 -53.5 -53.8 -53.2 67 -99 SPO 1997 10 06 01 08 -999 -99.9 -9 683.00 -53.5 -53.8 -53.2 67 -99 SPO 1997 10 06 01 09 -999 -99.9 -9 683.10 -53.5 -53.8 -53.1 67 -99 SPO 1997 10 06 01 10 -999 -99.9 -9 683.20 -53.4 -53.7 -53.2 66 -99 SPO 1997 10 06 01 11 -999 -99.9 -9 683.20 -53.4 -53.7 -53.2 65 -99 SPO 1997 10 06 01 12 -999 -99.9 -9 683.10 -53.4 -53.7 -53.1 66 -99 SPO 1997 10 06 01 13 -999 -99.9 -9 683.10 -53.3 -53.7 -53.0 66 -99 SPO 1997 10 06 01 14 -999 -99.9 -9 683.10 -53.4 -53.6 -52.9 67 -99 SPO 1997 10 06 01 15 -999 -99.9 -9 683.10 -53.3 -53.6 -52.8 67 -99 SPO 1997 10 06 01 16 -999 -99.9 -9 683.10 -53.3 -53.7 -52.8 67 -99 SPO 1997 10 06 01 17 -999 -99.9 -9 683.00 -53.3 -53.6 -52.9 67 -99 SPO 1997 10 06 01 18 -999 -99.9 -9 682.90 -53.4 -53.7 -53.0 68 -99 SPO 1997 10 06 01 19 -999 -99.9 -9 683.00 -53.3 -53.6 -52.8 68 -99 SPO 1997 10 06 01 20 -999 -99.9 -9 683.00 -53.3 -53.6 -52.8 68 -99 SPO 1997 10 06 01 21 -999 -99.9 -9 682.90 -53.3 -53.6 -52.8 68 -99 SPO 1997 10 06 01 22 -999 -99.9 -9 682.90 -53.3 -53.6 -52.8 68 -99 SPO 1997 10 06 01 23 -999 -99.9 -9 682.90 -53.3 -53.5 -52.8 68 -99 SPO 1997 10 06 01 24 -999 -99.9 -9 682.90 -53.3 -53.4 -52.8 68 -99 SPO 1997 10 06 01 25 -999 -99.9 -9 682.90 -53.2 -53.4 -52.7 67 -99 SPO 1997 10 06 01 26 -999 -99.9 -9 682.90 -53.2 -53.5 -52.8 68 -99 SPO 1997 10 06 01 27 -999 -99.9 -9 682.90 -53.2 -53.5 -52.8 68 -99 SPO 1997 10 06 01 28 -999 -99.9 -9 682.90 -53.2 -53.5 -52.8 68 -99 SPO 1997 10 06 01 29 -999 -99.9 -9 682.90 -53.2 -53.4 -52.9 67 -99 SPO 1997 10 06 01 30 -999 -99.9 -9 682.90 -53.1 -53.4 -52.8 66 -99 SPO 1997 10 06 01 31 -999 -99.9 -9 682.90 -53.0 -53.4 -52.8 65 -99 SPO 1997 10 06 01 32 -999 -99.9 -9 682.90 -53.0 -53.4 -52.8 65 -99 SPO 1997 10 06 01 33 -999 -99.9 -9 682.90 -53.0 -53.4 -52.7 65 -99 SPO 1997 10 06 01 34 -999 -99.9 -9 682.90 -53.0 -53.4 -52.7 66 -99 SPO 1997 10 06 01 35 -999 -99.9 -9 682.80 -53.0 -53.3 -52.7 66 -99 SPO 1997 10 06 01 36 -999 -99.9 -9 682.70 -53.0 -53.3 -52.7 67 -99 SPO 1997 10 06 01 37 -999 -99.9 -9 682.70 -52.8 -53.3 -52.7 65 -99 SPO 1997 10 06 01 38 -999 -99.9 -9 682.80 -52.8 -53.3 -52.7 65 -99 SPO 1997 10 06 01 39 -999 -99.9 -9 682.80 -52.8 -53.2 -52.6 65 -99 SPO 1997 10 06 01 40 -999 -99.9 -9 682.80 -52.8 -53.2 -52.6 65 -99 SPO 1997 10 06 01 41 -999 -99.9 -9 682.70 -52.8 -53.1 -52.6 66 -99 SPO 1997 10 06 01 42 -999 -99.9 -9 682.80 -52.8 -53.1 -52.6 66 -99 SPO 1997 10 06 01 43 -999 -99.9 -9 682.80 -52.8 -53.1 -52.6 67 -99 SPO 1997 10 06 01 44 -999 -99.9 -9 682.80 -52.6 -53.0 -52.5 65 -99 SPO 1997 10 06 01 45 -999 -99.9 -9 682.90 -52.7 -53.0 -52.5 67 -99 SPO 1997 10 06 01 46 -999 -99.9 -9 683.00 -52.6 -53.0 -52.4 66 -99 SPO 1997 10 06 01 47 -999 -99.9 -9 683.00 -52.6 -53.0 -52.3 66 -99 SPO 1997 10 06 01 48 -999 -99.9 -9 683.00 -52.6 -53.0 -52.2 66 -99 SPO 1997 10 06 01 49 -999 -99.9 -9 683.00 -52.6 -53.0 -52.3 66 -99 SPO 1997 10 06 01 50 -999 -99.9 -9 682.90 -52.6 -53.0 -52.3 65 -99 SPO 1997 10 06 01 51 -999 -99.9 -9 682.90 -52.6 -52.9 -52.2 65 -99 SPO 1997 10 06 01 52 -999 -99.9 -9 683.00 -52.6 -52.9 -52.2 66 -99 SPO 1997 10 06 01 53 -999 -99.9 -9 682.90 -52.6 -52.9 -52.3 66 -99 SPO 1997 10 06 01 54 -999 -99.9 -9 682.90 -52.5 -52.9 -52.2 66 -99 SPO 1997 10 06 01 55 -999 -99.9 -9 683.00 -52.4 -52.8 -52.1 65 -99 SPO 1997 10 06 01 56 -999 -99.9 -9 683.10 -52.4 -52.8 -52.1 66 -99 SPO 1997 10 06 01 57 -999 -99.9 -9 683.00 -52.4 -52.6 -52.0 66 -99 SPO 1997 10 06 01 58 -999 -99.9 -9 683.10 -52.4 -52.6 -51.9 67 -99 SPO 1997 10 06 01 59 -999 -99.9 -9 683.10 -52.4 -52.6 -51.8 67 -99 SPO 1997 10 06 02 00 -999 -99.9 -9 683.10 -52.3 -52.6 -51.8 68 0 SPO 1997 10 06 02 01 -999 -99.9 -9 683.10 -52.4 -52.5 -51.7 69 -99 SPO 1997 10 06 02 02 -999 -99.9 -9 683.10 -52.4 -52.6 -51.7 69 -99 SPO 1997 10 06 02 03 -999 -99.9 -9 683.20 -52.3 -52.6 -51.7 68 -99 SPO 1997 10 06 02 04 -999 -99.9 -9 683.20 -52.3 -52.7 -51.8 69 -99 SPO 1997 10 06 02 05 -999 -99.9 -9 683.20 -52.3 -52.7 -51.8 69 -99 SPO 1997 10 06 02 06 -999 -99.9 -9 683.20 -52.3 -52.6 -51.9 69 -99 SPO 1997 10 06 02 07 -999 -99.9 -9 683.20 -52.3 -52.6 -51.8 69 -99 SPO 1997 10 06 02 08 -999 -99.9 -9 683.20 -52.3 -52.6 -51.6 70 -99 SPO 1997 10 06 02 09 -999 -99.9 -9 683.20 -52.3 -52.7 -51.7 69 -99 SPO 1997 10 06 02 10 -999 -99.9 -9 683.20 -52.3 -52.7 -51.8 69 -99 SPO 1997 10 06 02 11 -999 -99.9 -9 683.20 -52.3 -52.7 -51.9 69 -99 SPO 1997 10 06 02 12 -999 -99.9 -9 683.10 -52.3 -52.7 -51.9 69 -99 SPO 1997 10 06 02 13 -999 -99.9 -9 683.00 -52.3 -52.6 -52.0 68 -99 SPO 1997 10 06 02 14 -999 -99.9 -9 683.00 -52.2 -52.6 -52.0 67 -99 SPO 1997 10 06 02 15 -999 -99.9 -9 683.00 -52.2 -52.6 -52.0 67 -99 SPO 1997 10 06 02 16 -999 -99.9 -9 683.00 -52.2 -52.6 -52.0 67 -99 SPO 1997 10 06 02 17 33 2.9 -9 683.00 -52.1 -52.5 -52.0 66 -99 SPO 1997 10 06 02 18 38 3.0 -9 683.00 -52.1 -52.5 -52.0 65 -99 SPO 1997 10 06 02 19 38 2.8 -9 683.10 -52.1 -52.5 -52.0 65 -99 SPO 1997 10 06 02 20 34 2.8 -9 683.10 -52.0 -52.4 -51.9 65 -99 SPO 1997 10 06 02 21 35 3.0 -9 683.00 -52.0 -52.4 -51.9 66 -99 SPO 1997 10 06 02 22 38 3.3 -9 683.00 -52.0 -52.4 -51.9 66 -99 SPO 1997 10 06 02 23 36 3.2 -9 683.10 -52.0 -52.4 -51.9 66 -99 SPO 1997 10 06 02 24 35 3.2 -9 683.00 -51.8 -52.4 -51.8 65 -99 SPO 1997 10 06 02 25 34 3.0 -9 683.00 -51.9 -52.3 -51.8 66 -99 SPO 1997 10 06 02 26 31 3.2 -9 683.00 -51.8 -52.3 -51.8 66 -99 SPO 1997 10 06 02 27 35 3.2 -9 683.00 -51.8 -52.2 -51.8 66 -99 SPO 1997 10 06 02 28 36 3.1 -9 683.00 -51.8 -52.2 -51.8 66 -99 SPO 1997 10 06 02 29 37 3.2 -9 683.00 -51.7 -52.2 -51.7 66 -99 SPO 1997 10 06 02 30 36 3.2 -9 683.00 -51.7 -52.1 -51.7 65 -99 SPO 1997 10 06 02 31 42 3.0 -9 683.10 -51.6 -52.1 -51.6 64 -99 SPO 1997 10 06 02 32 44 3.1 -9 683.10 -51.6 -52.0 -51.6 64 -99 SPO 1997 10 06 02 33 40 3.1 -9 683.10 -51.7 -52.0 -51.6 65 -99 SPO 1997 10 06 02 34 33 3.1 -9 683.10 -51.5 -51.9 -51.5 64 -99 SPO 1997 10 06 02 35 33 3.1 -9 683.10 -51.6 -51.9 -51.6 65 -99 SPO 1997 10 06 02 36 32 2.8 -9 683.10 -51.6 -51.9 -51.6 65 -99 SPO 1997 10 06 02 37 37 2.8 -9 683.20 -51.5 -51.9 -51.5 65 -99 SPO 1997 10 06 02 38 36 3.2 -9 683.10 -51.5 -51.9 -51.5 65 -99 SPO 1997 10 06 02 39 37 3.0 -9 683.10 -51.5 -51.9 -51.5 66 -99 SPO 1997 10 06 02 40 35 3.3 -9 683.10 -51.5 -51.9 -51.5 67 -99 SPO 1997 10 06 02 41 37 3.4 -9 683.10 -51.5 -51.9 -51.5 67 -99 SPO 1997 10 06 02 42 32 3.3 -9 683.00 -51.4 -51.8 -51.4 66 -99 SPO 1997 10 06 02 43 36 3.2 -9 683.00 -51.3 -51.8 -51.4 66 -99 SPO 1997 10 06 02 44 37 3.1 -9 683.10 -51.3 -51.8 -51.3 66 -99 SPO 1997 10 06 02 45 42 2.9 -9 683.10 -51.3 -51.8 -51.3 66 -99 SPO 1997 10 06 02 46 37 3.0 -9 683.10 -51.2 -51.7 -51.2 65 -99 SPO 1997 10 06 02 47 38 3.0 -9 683.20 -51.3 -51.7 -51.3 66 -99 SPO 1997 10 06 02 48 42 2.9 -9 683.20 -51.3 -51.6 -51.2 66 -99 SPO 1997 10 06 02 49 35 3.0 -9 683.20 -51.2 -51.6 -51.2 66 -99 SPO 1997 10 06 02 50 27 3.1 -9 683.10 -51.2 -51.6 -51.2 66 -99 SPO 1997 10 06 02 51 26 2.8 -9 683.10 -51.2 -51.6 -51.2 66 -99 SPO 1997 10 06 02 52 29 3.1 -9 683.10 -51.2 -51.5 -51.1 66 -99 SPO 1997 10 06 02 53 36 3.3 -9 683.10 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 02 54 34 3.3 -9 683.10 -51.0 -51.4 -51.0 65 -99 SPO 1997 10 06 02 55 32 3.7 -9 683.00 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 02 56 38 3.8 -9 683.00 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 02 57 38 4.2 -9 682.90 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 02 58 39 4.2 -9 682.90 -51.0 -51.5 -51.1 66 -99 SPO 1997 10 06 02 59 38 4.1 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 00 39 4.3 -9 682.90 -51.0 -51.5 -51.1 67 0 SPO 1997 10 06 03 01 40 4.0 -9 682.90 -51.0 -51.5 -51.0 67 -99 SPO 1997 10 06 03 02 35 4.1 -9 682.90 -51.0 -51.5 -51.0 67 -99 SPO 1997 10 06 03 03 39 4.2 -9 682.90 -51.0 -51.5 -51.0 67 -99 SPO 1997 10 06 03 04 38 4.2 -9 682.90 -51.1 -51.5 -51.0 69 -99 SPO 1997 10 06 03 05 36 4.0 -9 682.90 -51.0 -51.5 -51.0 68 -99 SPO 1997 10 06 03 06 34 4.3 -9 682.90 -51.0 -51.5 -51.0 67 -99 SPO 1997 10 06 03 07 37 4.2 -9 682.90 -51.1 -51.4 -51.1 67 -99 SPO 1997 10 06 03 08 30 4.3 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 09 30 4.4 -9 682.90 -51.1 -51.4 -51.1 67 -99 SPO 1997 10 06 03 10 30 3.9 -9 682.90 -51.1 -51.4 -51.1 66 -99 SPO 1997 10 06 03 11 26 4.0 -9 682.90 -51.1 -51.4 -51.1 66 -99 SPO 1997 10 06 03 12 34 4.1 -9 682.90 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 03 13 33 4.0 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 14 28 4.0 -9 682.90 -51.1 -51.5 -51.0 67 -99 SPO 1997 10 06 03 15 35 4.1 -9 682.80 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 16 35 4.0 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 17 34 3.5 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 18 38 3.5 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 19 30 3.2 -9 682.90 -51.1 -51.4 -51.0 67 -99 SPO 1997 10 06 03 20 28 3.0 -9 683.00 -51.1 -51.5 -51.0 66 -99 SPO 1997 10 06 03 21 23 3.4 -9 683.00 -51.1 -51.5 -51.0 66 -99 SPO 1997 10 06 03 22 26 3.0 -9 683.00 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 03 23 36 3.2 -9 683.10 -51.1 -51.5 -51.1 66 -99 SPO 1997 10 06 03 24 34 3.2 -9 683.10 -51.1 -51.4 -51.1 67 -99 SPO 1997 10 06 03 25 30 3.4 -9 683.10 -51.1 -51.5 -51.0 67 -99 SPO 1997 10 06 03 26 29 3.3 -9 683.00 -51.2 -51.5 -51.1 68 -99 SPO 1997 10 06 03 27 28 3.6 -9 682.90 -51.1 -51.5 -51.0 67 -99 SPO 1997 10 06 03 28 25 3.9 -9 682.90 -51.1 -51.5 -51.1 67 -99 SPO 1997 10 06 03 29 28 3.9 -9 682.90 -51.2 -51.6 -51.1 68 -99 SPO 1997 10 06 03 30 26 3.7 -9 683.00 -51.2 -51.6 -51.1 68 -99 SPO 1997 10 06 03 31 26 3.7 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 32 27 3.7 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 33 28 3.6 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 34 24 3.5 -9 683.00 -51.2 -51.6 -51.1 65 -99 SPO 1997 10 06 03 35 22 3.7 -9 683.00 -51.2 -51.5 -51.1 65 -99 SPO 1997 10 06 03 36 25 3.8 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 37 20 4.0 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 38 24 3.8 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 39 17 3.6 -9 683.00 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 40 12 3.7 -9 683.10 -51.2 -51.6 -51.1 67 -99 SPO 1997 10 06 03 41 16 3.6 -9 683.10 -51.2 -51.6 -51.1 67 -99 SPO 1997 10 06 03 42 15 3.3 -9 683.10 -51.3 -51.6 -51.1 68 -99 SPO 1997 10 06 03 43 15 3.4 -9 683.10 -51.2 -51.6 -51.1 66 -99 SPO 1997 10 06 03 44 17 3.5 -9 683.20 -51.2 -51.6 -51.2 66 -99 SPO 1997 10 06 03 45 17 3.1 -9 683.20 -51.3 -51.6 -51.2 66 -99 SPO 1997 10 06 03 46 18 2.9 -9 683.20 -51.2 -51.6 -51.1 65 -99 SPO 1997 10 06 03 47 21 3.0 -9 683.20 -51.2 -51.6 -51.1 65 -99 SPO 1997 10 06 03 48 14 3.4 -9 683.20 -51.2 -51.6 -51.1 65 -99 SPO 1997 10 06 03 49 12 3.4 -9 683.20 -51.3 -51.6 -51.2 66 -99 SPO 1997 10 06 03 50 8 3.5 -9 683.20 -51.3 -51.6 -51.2 66 -99 SPO 1997 10 06 03 51 11 4.0 -9 683.10 -51.3 -51.7 -51.3 67 -99 SPO 1997 10 06 03 52 12 4.0 -9 683.10 -51.3 -51.7 -51.3 67 -99 SPO 1997 10 06 03 53 11 3.7 -9 683.10 -51.4 -51.7 -51.3 67 -99 SPO 1997 10 06 03 54 11 3.7 -9 683.10 -51.4 -51.7 -51.3 67 -99 SPO 1997 10 06 03 55 12 3.5 -9 683.20 -51.3 -51.7 -51.3 66 -99 SPO 1997 10 06 03 56 12 3.3 -9 683.20 -51.3 -51.7 -51.2 66 -99 SPO 1997 10 06 03 57 15 3.5 -9 683.20 -51.4 -51.7 -51.3 66 -99 SPO 1997 10 06 03 58 24 3.1 -9 683.20 -51.4 -51.7 -51.2 66 -99 SPO 1997 10 06 03 59 24 2.9 -9 683.20 -51.4 -51.7 -51.3 66 -99 SPO 1997 10 06 04 00 27 3.2 -9 683.20 -51.3 -51.7 -51.2 64 0 SPO 1997 10 06 04 01 30 3.4 -9 683.20 -51.4 -51.8 -51.3 65 -99 SPO 1997 10 06 04 02 27 3.1 -9 683.20 -51.4 -51.8 -51.4 65 -99 SPO 1997 10 06 04 03 24 2.9 -9 683.20 -51.4 -51.9 -51.4 66 -99 SPO 1997 10 06 04 04 28 3.1 -9 683.20 -51.5 -51.9 -51.4 67 -99 SPO 1997 10 06 04 05 34 2.8 -9 683.30 -51.4 -51.9 -51.4 66 -99 SPO 1997 10 06 04 06 29 2.9 -9 683.30 -51.5 -51.9 -51.4 67 -99 SPO 1997 10 06 04 07 27 2.9 -9 683.30 -51.6 -51.9 -51.5 68 -99 SPO 1997 10 06 04 08 21 3.0 -9 683.30 -51.6 -51.9 -51.5 68 -99 SPO 1997 10 06 04 09 25 3.2 -9 683.30 -51.6 -51.9 -51.5 66 -99 SPO 1997 10 06 04 10 30 3.0 -9 683.30 -51.6 -51.9 -51.5 66 -99 SPO 1997 10 06 04 11 27 3.1 -9 683.30 -51.6 -51.9 -51.5 65 -99 SPO 1997 10 06 04 12 32 3.2 -9 683.30 -51.6 -51.9 -51.5 64 -99 SPO 1997 10 06 04 13 28 3.2 -9 683.20 -51.6 -52.0 -51.5 64 -99 SPO 1997 10 06 04 14 27 3.2 -9 683.30 -51.7 -51.9 -51.5 65 -99 SPO 1997 10 06 04 15 24 3.2 -9 683.20 -51.6 -51.9 -51.5 64 -99 SPO 1997 10 06 04 16 24 3.2 -9 683.30 -51.7 -52.0 -51.5 65 -99 SPO 1997 10 06 04 17 26 3.2 -9 683.30 -51.7 -52.0 -51.5 66 -99 SPO 1997 10 06 04 18 20 3.2 -9 683.30 -51.7 -52.0 -51.6 66 -99 SPO 1997 10 06 04 19 20 3.2 -9 683.30 -51.7 -52.1 -51.6 66 -99 SPO 1997 10 06 04 20 17 3.2 -9 683.30 -51.8 -52.1 -51.6 67 -99 SPO 1997 10 06 04 21 13 3.2 -9 683.30 -51.8 -52.1 -51.6 66 -99 SPO 1997 10 06 04 22 15 3.3 -9 683.40 -51.8 -52.1 -51.6 66 -99 SPO 1997 10 06 04 23 22 3.2 -9 683.30 -51.8 -52.1 -51.6 66 -99 SPO 1997 10 06 04 24 20 3.3 -9 683.30 -51.9 -52.2 -51.6 66 -99 SPO 1997 10 06 04 25 16 3.1 -9 683.30 -51.9 -52.2 -51.6 66 -99 SPO 1997 10 06 04 26 15 3.5 -9 683.30 -51.9 -52.2 -51.7 66 -99 SPO 1997 10 06 04 27 19 3.2 -9 683.30 -51.9 -52.2 -51.7 66 -99 SPO 1997 10 06 04 28 16 3.0 -9 683.30 -51.9 -52.2 -51.7 66 -99 SPO 1997 10 06 04 29 16 3.2 -9 683.40 -51.9 -52.2 -51.7 66 -99 SPO 1997 10 06 04 30 16 3.0 -9 683.40 -52.0 -52.2 -51.7 67 -99 SPO 1997 10 06 04 31 13 2.9 -9 683.40 -52.0 -52.2 -51.7 67 -99 SPO 1997 10 06 04 32 15 2.9 -9 683.40 -52.0 -52.2 -51.8 67 -99 SPO 1997 10 06 04 33 18 2.8 -9 683.40 -52.1 -52.2 -51.8 67 -99 SPO 1997 10 06 04 34 18 2.4 -9 683.50 -52.1 -52.3 -51.8 66 -99 SPO 1997 10 06 04 35 18 2.5 -9 683.50 -52.1 -52.3 -51.8 65 -99 SPO 1997 10 06 04 36 23 2.6 -9 683.50 -52.1 -52.4 -51.8 65 -99 SPO 1997 10 06 04 37 20 2.4 -9 683.50 -52.2 -52.4 -51.8 65 -99 SPO 1997 10 06 04 38 23 2.6 -9 683.50 -52.2 -52.4 -51.8 65 -99 SPO 1997 10 06 04 39 26 2.8 -9 683.50 -52.3 -52.4 -51.9 66 -99 SPO 1997 10 06 04 40 25 2.7 -9 683.50 -52.3 -52.4 -52.0 66 -99 SPO 1997 10 06 04 41 31 2.7 -9 683.60 -52.4 -52.5 -52.1 67 -99 SPO 1997 10 06 04 42 30 2.6 -9 683.60 -52.4 -52.5 -52.1 67 -99 SPO 1997 10 06 04 43 25 2.6 -9 683.60 -52.4 -52.5 -52.1 66 -99 SPO 1997 10 06 04 44 23 2.4 -9 683.60 -52.5 -52.5 -52.2 66 -99 SPO 1997 10 06 04 45 22 2.2 -9 683.60 -52.6 -52.5 -52.2 66 -99 SPO 1997 10 06 04 46 19 2.2 -9 683.60 -52.6 -52.5 -52.2 65 -99 SPO 1997 10 06 04 47 21 2.0 -9 683.70 -52.6 -52.5 -52.2 64 -99 SPO 1997 10 06 04 48 20 1.9 -9 683.70 -52.6 -52.4 -52.1 64 -99 SPO 1997 10 06 04 49 20 2.0 -9 683.70 -52.6 -52.4 -52.1 63 -99 SPO 1997 10 06 04 50 22 1.9 -9 683.70 -52.6 -52.4 -52.1 64 -99 SPO 1997 10 06 04 51 25 1.9 -9 683.70 -52.6 -52.4 -52.1 65 -99 SPO 1997 10 06 04 52 28 1.8 -9 683.70 -52.6 -52.5 -52.1 66 -99 SPO 1997 10 06 04 53 27 1.8 -9 683.60 -52.6 -52.5 -52.0 67 -99 SPO 1997 10 06 04 54 28 2.0 -9 683.60 -52.6 -52.5 -52.0 67 -99 SPO 1997 10 06 04 55 27 2.1 -9 683.60 -52.6 -52.5 -52.0 68 -99 SPO 1997 10 06 04 56 30 2.2 -9 683.60 -52.6 -52.5 -52.0 69 -99 SPO 1997 10 06 04 57 36 2.4 -9 683.60 -52.7 -52.5 -52.0 69 -99 SPO 1997 10 06 04 58 33 2.2 -9 683.60 -52.8 -52.5 -52.1 70 -99 SPO 1997 10 06 04 59 31 2.1 -9 683.60 -52.9 -52.6 -52.1 70 -99 SPO 1997 10 06 05 00 33 2.0 -9 683.60 -52.9 -52.6 -52.1 69 0 SPO 1997 10 06 05 01 34 2.2 -9 683.60 -52.9 -52.6 -52.1 68 -99 SPO 1997 10 06 05 02 35 2.4 -9 683.60 -52.9 -52.6 -52.2 68 -99 SPO 1997 10 06 05 03 36 2.7 -9 683.60 -53.0 -52.6 -52.2 68 -99 SPO 1997 10 06 05 04 37 2.6 -9 683.60 -53.0 -52.6 -52.3 68 -99 SPO 1997 10 06 05 05 40 2.5 -9 683.60 -53.1 -52.6 -52.3 68 -99 SPO 1997 10 06 05 06 38 2.5 -9 683.60 -53.1 -52.6 -52.4 68 -99 SPO 1997 10 06 05 07 38 2.6 -9 683.60 -53.1 -52.6 -52.4 68 -99 SPO 1997 10 06 05 08 40 2.6 -9 683.70 -53.2 -52.6 -52.4 68 -99 SPO 1997 10 06 05 09 40 2.5 -9 683.70 -53.2 -52.7 -52.4 68 -99 SPO 1997 10 06 05 10 39 2.6 -9 683.60 -53.2 -52.7 -52.4 68 -99 SPO 1997 10 06 05 11 39 2.6 -9 683.60 -53.3 -52.7 -52.5 68 -99 SPO 1997 10 06 05 12 40 2.8 -9 683.70 -53.2 -52.7 -52.5 68 -99 SPO 1997 10 06 05 13 42 2.8 -9 683.60 -53.2 -52.7 -52.5 68 -99 SPO 1997 10 06 05 14 43 2.8 -9 683.60 -53.2 -52.7 -52.5 68 -99 SPO 1997 10 06 05 15 46 2.9 -9 683.70 -53.2 -52.8 -52.5 68 -99 SPO 1997 10 06 05 16 47 2.7 -9 683.70 -53.2 -52.8 -52.5 68 -99 SPO 1997 10 06 05 17 47 2.8 -9 683.70 -53.2 -52.8 -52.4 68 -99 SPO 1997 10 06 05 18 48 2.8 -9 683.70 -53.2 -52.8 -52.4 68 -99 SPO 1997 10 06 05 19 46 2.7 -9 683.70 -53.2 -52.8 -52.4 68 -99 SPO 1997 10 06 05 20 43 2.8 -9 683.70 -53.2 -52.8 -52.4 68 -99 SPO 1997 10 06 05 21 43 2.6 -9 683.80 -53.2 -52.9 -52.4 68 -99 SPO 1997 10 06 05 22 45 2.5 -9 683.80 -53.2 -52.9 -52.4 68 -99 SPO 1997 10 06 05 23 50 2.5 -9 683.80 -53.2 -52.9 -52.4 68 -99 SPO 1997 10 06 05 24 52 2.5 -9 683.80 -53.2 -52.9 -52.5 68 -99 SPO 1997 10 06 05 25 50 2.5 -9 683.80 -53.2 -53.0 -52.5 68 -99 SPO 1997 10 06 05 26 48 2.7 -9 683.70 -53.2 -53.0 -52.6 68 -99 SPO 1997 10 06 05 27 49 2.7 -9 683.80 -53.2 -53.1 -52.6 67 -99 SPO 1997 10 06 05 28 53 2.5 -9 683.80 -53.2 -53.1 -52.6 66 -99 SPO 1997 10 06 05 29 63 2.3 -9 683.80 -53.2 -53.2 -52.7 65 -99 SPO 1997 10 06 05 30 60 2.2 -9 683.80 -53.4 -53.4 -52.8 66 -99 SPO 1997 10 06 05 31 58 2.2 -9 683.80 -53.5 -53.3 -52.9 67 -99 SPO 1997 10 06 05 32 56 2.4 -9 683.80 -53.6 -53.3 -53.0 67 -99 SPO 1997 10 06 05 33 60 2.4 -9 683.80 -53.6 -53.3 -53.0 66 -99 SPO 1997 10 06 05 34 57 2.3 -9 683.80 -53.6 -53.3 -53.1 66 -99 SPO 1997 10 06 05 35 53 2.2 -9 683.80 -53.7 -53.3 -53.2 66 -99 SPO 1997 10 06 05 36 58 2.3 -9 683.80 -53.7 -53.4 -53.2 66 -99 SPO 1997 10 06 05 37 57 2.5 -9 683.80 -53.8 -53.6 -53.3 67 -99 SPO 1997 10 06 05 38 52 2.4 -9 683.80 -53.8 -53.6 -53.3 66 -99 SPO 1997 10 06 05 39 51 2.6 -9 683.80 -53.9 -53.6 -53.4 66 -99 SPO 1997 10 06 05 40 48 2.6 -9 683.80 -53.9 -53.6 -53.4 65 -99 SPO 1997 10 06 05 41 46 2.6 -9 683.70 -53.9 -53.6 -53.4 64 -99 SPO 1997 10 06 05 42 47 2.7 -9 683.70 -54.0 -53.6 -53.5 63 -99 SPO 1997 10 06 05 43 45 2.6 -9 683.80 -54.0 -53.6 -53.4 63 -99 SPO 1997 10 06 05 44 43 2.7 -9 683.80 -54.0 -53.8 -53.4 63 -99 SPO 1997 10 06 05 45 42 2.8 -9 683.70 -54.0 -53.9 -53.5 63 -99 SPO 1997 10 06 05 46 42 2.9 -9 683.70 -54.0 -54.0 -53.5 63 -99 SPO 1997 10 06 05 47 41 3.0 -9 683.70 -54.0 -54.0 -53.5 64 -99 SPO 1997 10 06 05 48 41 3.0 -9 683.70 -54.0 -54.0 -53.6 64 -99 SPO 1997 10 06 05 49 38 3.2 -9 683.70 -54.0 -54.0 -53.6 64 -99 SPO 1997 10 06 05 50 36 3.0 -9 683.70 -54.0 -54.0 -53.6 65 -99 SPO 1997 10 06 05 51 34 2.9 -9 683.70 -54.1 -53.9 -53.6 66 -99 SPO 1997 10 06 05 52 32 2.9 -9 683.70 -54.0 -53.9 -53.6 64 -99 SPO 1997 10 06 05 53 34 3.0 -9 683.70 -54.0 -53.9 -53.5 63 -99 SPO 1997 10 06 05 54 33 2.9 -9 683.80 -54.0 -53.8 -53.5 63 -99 SPO 1997 10 06 05 55 32 2.8 -9 683.80 -54.0 -53.8 -53.5 63 -99 SPO 1997 10 06 05 56 33 3.0 -9 683.70 -54.0 -53.8 -53.5 63 -99 SPO 1997 10 06 05 57 29 3.1 -9 683.80 -54.0 -53.7 -53.4 63 -99 SPO 1997 10 06 05 58 30 2.8 -9 683.80 -54.0 -53.7 -53.4 64 -99 SPO 1997 10 06 05 59 29 2.7 -9 683.80 -53.9 -53.7 -53.3 64 -99 SPO 1997 10 06 06 00 29 2.6 -9 683.90 -53.9 -53.7 -53.3 64 0 SPO 1997 10 06 06 01 29 2.5 -9 683.90 -53.9 -53.8 -53.2 66 -99 SPO 1997 10 06 06 02 32 2.3 -9 683.90 -53.8 -53.8 -53.0 66 -99 SPO 1997 10 06 06 03 34 2.3 -9 684.00 -53.8 -53.7 -52.8 67 -99 SPO 1997 10 06 06 04 33 2.2 -9 684.00 -53.6 -53.7 -52.6 65 -99 SPO 1997 10 06 06 05 33 2.2 -9 684.00 -53.6 -53.7 -52.5 67 -99 SPO 1997 10 06 06 06 33 2.3 -9 684.00 -53.6 -53.7 -52.6 67 -99 SPO 1997 10 06 06 07 32 2.2 -9 684.00 -53.6 -53.7 -52.7 68 -99 SPO 1997 10 06 06 08 30 2.0 -9 684.00 -53.6 -53.8 -52.8 68 -99 SPO 1997 10 06 06 09 29 2.1 -9 684.00 -53.6 -53.8 -52.8 68 -99 SPO 1997 10 06 06 10 30 2.3 -9 684.00 -53.5 -53.8 -52.8 68 -99 SPO 1997 10 06 06 11 29 2.3 -9 684.00 -53.5 -53.8 -52.9 68 -99 SPO 1997 10 06 06 12 27 2.2 -9 684.10 -53.5 -53.8 -52.9 68 -99 SPO 1997 10 06 06 13 25 2.2 -9 684.10 -53.5 -53.8 -52.9 68 -99 SPO 1997 10 06 06 14 23 2.1 -9 684.10 -53.5 -53.8 -53.0 68 -99 SPO 1997 10 06 06 15 24 1.9 -9 684.10 -53.5 -53.8 -52.9 68 -99 SPO 1997 10 06 06 16 27 2.1 -9 684.20 -53.5 -53.7 -52.9 68 -99 SPO 1997 10 06 06 17 27 2.0 -9 684.20 -53.5 -53.8 -53.0 66 -99 SPO 1997 10 06 06 18 27 1.8 -9 684.10 -53.4 -53.8 -52.9 65 -99 SPO 1997 10 06 06 19 22 1.9 -9 684.20 -53.4 -53.8 -53.0 65 -99 SPO 1997 10 06 06 20 23 1.9 -9 684.10 -53.5 -53.8 -53.0 66 -99 SPO 1997 10 06 06 21 27 2.8 -9 684.00 -53.5 -53.8 -53.2 66 -99 SPO 1997 10 06 06 22 31 2.8 -9 684.00 -53.5 -53.8 -53.2 66 -99 SPO 1997 10 06 06 23 29 2.8 -9 684.00 -53.5 -53.8 -53.2 66 -99 SPO 1997 10 06 06 24 30 2.6 -9 684.10 -53.5 -53.8 -53.2 66 -99 SPO 1997 10 06 06 25 29 2.7 -9 684.10 -53.4 -53.8 -53.2 65 -99 SPO 1997 10 06 06 26 25 2.5 -9 684.20 -53.4 -53.8 -53.2 65 -99 SPO 1997 10 06 06 27 29 2.5 -9 684.20 -53.4 -53.7 -53.2 65 -99 SPO 1997 10 06 06 28 28 2.5 -9 684.20 -53.4 -53.7 -53.2 65 -99 SPO 1997 10 06 06 29 27 2.4 -9 684.20 -53.5 -53.7 -53.2 66 -99 SPO 1997 10 06 06 30 23 2.3 -9 684.20 -53.5 -53.7 -53.2 65 -99 SPO 1997 10 06 06 31 25 2.2 -9 684.30 -53.4 -53.7 -53.2 64 -99 SPO 1997 10 06 06 32 22 2.5 -9 684.30 -53.4 -53.7 -53.2 64 -99 SPO 1997 10 06 06 33 26 2.3 -9 684.30 -53.5 -53.7 -53.2 64 -99 SPO 1997 10 06 06 34 20 2.3 -9 684.30 -53.5 -53.8 -53.2 64 -99 SPO 1997 10 06 06 35 22 2.5 -9 684.30 -53.5 -53.8 -53.3 64 -99 SPO 1997 10 06 06 36 28 2.5 -9 684.30 -53.5 -53.8 -53.2 64 -99 SPO 1997 10 06 06 37 29 2.4 -9 684.30 -53.5 -53.8 -53.2 65 -99 SPO 1997 10 06 06 38 23 2.2 -9 684.30 -53.5 -53.8 -53.2 65 -99 SPO 1997 10 06 06 39 26 2.2 -9 684.40 -53.5 -53.8 -53.2 65 -99 SPO 1997 10 06 06 40 21 2.1 -9 684.40 -53.6 -53.9 -53.3 66 -99 SPO 1997 10 06 06 41 25 2.3 -9 684.40 -53.6 -53.9 -53.3 66 -99 SPO 1997 10 06 06 42 27 2.3 -9 684.40 -53.6 -53.9 -53.3 66 -99 SPO 1997 10 06 06 43 24 2.6 -9 684.40 -53.6 -53.9 -53.3 65 -99 SPO 1997 10 06 06 44 23 2.6 -9 684.40 -53.6 -53.9 -53.4 65 -99 SPO 1997 10 06 06 45 24 2.3 -9 684.40 -53.6 -53.9 -53.4 64 -99 SPO 1997 10 06 06 46 22 2.7 -9 684.40 -53.6 -53.9 -53.4 64 -99 SPO 1997 10 06 06 47 24 2.6 -9 684.40 -53.7 -53.9 -53.4 65 -99 SPO 1997 10 06 06 48 23 2.4 -9 684.50 -53.7 -53.9 -53.4 64 -99 SPO 1997 10 06 06 49 23 2.1 -9 684.50 -53.6 -53.9 -53.4 64 -99 SPO 1997 10 06 06 50 27 2.2 -9 684.50 -53.6 -54.0 -53.3 64 -99 SPO 1997 10 06 06 51 30 2.4 -9 684.50 -53.6 -54.0 -53.3 64 -99 SPO 1997 10 06 06 52 33 2.4 -9 684.50 -53.6 -54.0 -53.3 65 -99 SPO 1997 10 06 06 53 37 2.8 -9 684.50 -53.6 -54.0 -53.3 65 -99 SPO 1997 10 06 06 54 37 2.7 -9 684.50 -53.6 -54.0 -53.4 65 -99 SPO 1997 10 06 06 55 37 2.6 -9 684.50 -53.6 -54.0 -53.4 65 -99 SPO 1997 10 06 06 56 34 2.5 -9 684.50 -53.7 -54.0 -53.4 66 -99 SPO 1997 10 06 06 57 32 2.6 -9 684.50 -53.6 -54.0 -53.4 64 -99 SPO 1997 10 06 06 58 29 2.5 -9 684.50 -53.7 -54.0 -53.4 64 -99 SPO 1997 10 06 06 59 28 2.5 -9 684.50 -53.7 -54.0 -53.4 64 -99 SPO 1997 10 06 07 00 34 2.6 -9 684.50 -53.7 -54.0 -53.4 65 0 SPO 1997 10 06 07 01 31 2.8 -9 684.50 -53.7 -54.0 -53.5 65 -99 SPO 1997 10 06 07 02 28 2.5 -9 684.50 -53.7 -54.0 -53.5 65 -99 SPO 1997 10 06 07 03 33 2.8 -9 684.50 -53.7 -54.0 -53.4 65 -99 SPO 1997 10 06 07 04 31 2.8 -9 684.50 -53.7 -54.0 -53.4 65 -99 SPO 1997 10 06 07 05 31 2.8 -9 684.50 -53.7 -54.0 -53.4 65 -99 SPO 1997 10 06 07 06 30 2.7 -9 684.50 -53.7 -54.1 -53.4 66 -99 SPO 1997 10 06 07 07 27 2.9 -9 684.50 -53.7 -54.1 -53.5 65 -99 SPO 1997 10 06 07 08 29 2.9 -9 684.40 -53.8 -54.1 -53.6 66 -99 SPO 1997 10 06 07 09 26 2.7 -9 684.40 -53.8 -54.1 -53.6 65 -99 SPO 1997 10 06 07 10 25 2.8 -9 684.50 -53.8 -54.1 -53.6 64 -99 SPO 1997 10 06 07 11 28 2.6 -9 684.50 -53.8 -54.2 -53.6 64 -99 SPO 1997 10 06 07 12 23 2.8 -9 684.50 -53.9 -54.2 -53.7 65 -99 SPO 1997 10 06 07 13 25 2.3 -9 684.60 -53.9 -54.2 -53.7 65 -99 SPO 1997 10 06 07 14 24 2.4 -9 684.50 -53.9 -54.2 -53.7 65 -99 SPO 1997 10 06 07 15 24 2.3 -9 684.50 -53.9 -54.1 -53.7 64 -99 SPO 1997 10 06 07 16 27 2.4 -9 684.60 -53.9 -54.1 -53.7 64 -99 SPO 1997 10 06 07 17 31 2.4 -9 684.50 -53.9 -54.1 -53.7 64 -99 SPO 1997 10 06 07 18 28 2.5 -9 684.60 -53.9 -54.1 -53.7 64 -99 SPO 1997 10 06 07 19 28 2.4 -9 684.50 -53.9 -54.1 -53.7 63 -99 SPO 1997 10 06 07 20 28 2.2 -9 684.60 -53.9 -54.1 -53.7 63 -99 SPO 1997 10 06 07 21 29 2.5 -9 684.60 -53.9 -54.1 -53.7 63 -99 SPO 1997 10 06 07 22 29 2.5 -9 684.60 -53.9 -54.2 -53.6 63 -99 SPO 1997 10 06 07 23 29 2.4 -9 684.50 -53.9 -54.1 -53.5 63 -99 SPO 1997 10 06 07 24 29 2.4 -9 684.60 -53.9 -54.2 -53.5 64 -99 SPO 1997 10 06 07 25 36 2.5 -9 684.60 -53.9 -54.2 -53.4 65 -99 SPO 1997 10 06 07 26 39 2.4 -9 684.60 -53.9 -54.1 -53.4 66 -99 SPO 1997 10 06 07 27 41 2.5 -9 684.60 -53.9 -54.2 -53.4 66 -99 SPO 1997 10 06 07 28 42 2.7 -9 684.60 -53.9 -54.2 -53.4 66 -99 SPO 1997 10 06 07 29 44 2.7 -9 684.60 -53.9 -54.2 -53.4 67 -99 SPO 1997 10 06 07 30 44 2.8 -9 684.60 -54.0 -54.2 -53.5 68 -99 SPO 1997 10 06 07 31 42 2.8 -9 684.70 -54.0 -54.2 -53.5 67 -99 SPO 1997 10 06 07 32 43 3.0 -9 684.70 -54.0 -54.3 -53.6 67 -99 SPO 1997 10 06 07 33 39 3.1 -9 684.70 -54.1 -54.3 -53.6 67 -99 SPO 1997 10 06 07 34 40 2.9 -9 684.70 -54.1 -54.3 -53.6 67 -99 SPO 1997 10 06 07 35 41 3.0 -9 684.70 -54.1 -54.3 -53.6 66 -99 SPO 1997 10 06 07 36 37 3.0 -9 684.70 -54.1 -54.3 -53.6 65 -99 SPO 1997 10 06 07 37 38 3.1 -9 684.70 -54.2 -54.4 -53.7 66 -99 SPO 1997 10 06 07 38 36 3.0 -9 684.70 -54.2 -54.4 -53.7 67 -99 SPO 1997 10 06 07 39 39 2.8 -9 684.70 -54.1 -54.5 -53.7 66 -99 SPO 1997 10 06 07 40 40 2.9 -9 684.70 -54.2 -54.5 -53.7 67 -99 SPO 1997 10 06 07 41 37 3.2 -9 684.70 -54.2 -54.6 -53.8 67 -99 SPO 1997 10 06 07 42 42 2.8 -9 684.70 -54.3 -54.6 -53.8 67 -99 SPO 1997 10 06 07 43 48 2.9 -9 684.70 -54.3 -54.6 -53.8 67 -99 SPO 1997 10 06 07 44 48 2.9 -9 684.80 -54.3 -54.6 -53.9 66 -99 SPO 1997 10 06 07 45 48 3.1 -9 684.70 -54.3 -54.6 -53.9 65 -99 SPO 1997 10 06 07 46 50 3.4 -9 684.70 -54.4 -54.6 -54.0 64 -99 SPO 1997 10 06 07 47 46 3.5 -9 684.60 -54.4 -54.6 -54.0 64 -99 SPO 1997 10 06 07 48 46 3.4 -9 684.60 -54.4 -54.6 -54.1 63 -99 SPO 1997 10 06 07 49 44 3.4 -9 684.60 -54.4 -54.6 -54.1 63 -99 SPO 1997 10 06 07 50 43 3.4 -9 684.60 -54.4 -54.6 -54.2 63 -99 SPO 1997 10 06 07 51 40 3.4 -9 684.60 -54.5 -54.7 -54.2 64 -99 SPO 1997 10 06 07 52 41 3.8 -9 684.60 -54.4 -54.7 -54.2 63 -99 SPO 1997 10 06 07 53 43 3.6 -9 684.60 -54.5 -54.7 -54.3 64 -99 SPO 1997 10 06 07 54 44 3.5 -9 684.60 -54.5 -54.8 -54.3 63 -99 SPO 1997 10 06 07 55 46 3.6 -9 684.70 -54.5 -54.8 -54.3 63 -99 SPO 1997 10 06 07 56 48 3.3 -9 684.70 -54.6 -54.8 -54.4 64 -99 SPO 1997 10 06 07 57 50 3.4 -9 684.70 -54.6 -54.8 -54.4 63 -99 SPO 1997 10 06 07 58 53 3.4 -9 684.70 -54.6 -54.9 -54.4 63 -99 SPO 1997 10 06 07 59 52 3.6 -9 684.60 -54.7 -54.9 -54.5 62 -99 SPO 1997 10 06 08 00 52 3.6 -9 684.60 -54.7 -54.9 -54.5 62 0 SPO 1997 10 06 08 01 51 3.5 -9 684.60 -54.7 -54.9 -54.5 62 -99 SPO 1997 10 06 08 02 51 3.2 -9 684.70 -54.7 -54.9 -54.5 62 -99 SPO 1997 10 06 08 03 52 3.3 -9 684.70 -54.7 -54.9 -54.6 62 -99 SPO 1997 10 06 08 04 48 3.3 -9 684.70 -54.7 -54.9 -54.6 62 -99 SPO 1997 10 06 08 05 49 3.4 -9 684.70 -54.8 -54.9 -54.6 63 -99 SPO 1997 10 06 08 06 47 3.1 -9 684.70 -54.7 -55.0 -54.6 63 -99 SPO 1997 10 06 08 07 46 3.0 -9 684.70 -54.7 -55.0 -54.6 63 -99 SPO 1997 10 06 08 08 47 3.4 -9 684.70 -54.7 -55.0 -54.5 62 -99 SPO 1997 10 06 08 09 48 3.0 -9 684.70 -54.8 -55.0 -54.5 62 -99 SPO 1997 10 06 08 10 45 3.3 -9 684.70 -54.8 -55.0 -54.4 62 -99 SPO 1997 10 06 08 11 48 3.3 -9 684.70 -54.8 -55.0 -54.4 62 -99 SPO 1997 10 06 08 12 47 3.5 -9 684.70 -54.8 -55.1 -54.6 62 -99 SPO 1997 10 06 08 13 49 3.5 -9 684.70 -54.9 -55.1 -54.6 63 -99 SPO 1997 10 06 08 14 46 3.5 -9 684.60 -54.9 -55.1 -54.6 63 -99 SPO 1997 10 06 08 15 46 3.2 -9 684.70 -54.9 -55.1 -54.6 63 -99 SPO 1997 10 06 08 16 46 3.5 -9 684.70 -54.9 -55.1 -54.7 63 -99 SPO 1997 10 06 08 17 44 3.4 -9 684.70 -54.9 -55.2 -54.7 63 -99 SPO 1997 10 06 08 18 45 3.8 -9 684.70 -55.0 -55.2 -54.8 63 -99 SPO 1997 10 06 08 19 45 3.5 -9 684.70 -55.0 -55.2 -54.8 63 -99 SPO 1997 10 06 08 20 45 3.5 -9 684.60 -55.0 -55.2 -54.8 63 -99 SPO 1997 10 06 08 21 46 3.8 -9 684.70 -55.0 -55.2 -54.8 63 -99 SPO 1997 10 06 08 22 47 3.5 -9 684.70 -54.9 -55.2 -54.9 62 -99 SPO 1997 10 06 08 23 46 3.6 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 24 47 3.8 -9 684.60 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 25 47 3.5 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 26 43 3.1 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 27 41 2.8 -9 684.80 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 28 41 2.9 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 29 40 2.8 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 30 42 3.0 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 31 43 3.1 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 32 43 3.2 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 33 46 3.2 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 34 45 3.2 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 35 41 2.9 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 36 41 3.0 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 37 39 3.0 -9 684.70 -55.0 -55.2 -54.8 62 -99 SPO 1997 10 06 08 38 44 3.1 -9 684.70 -55.0 -55.3 -54.8 62 -99 SPO 1997 10 06 08 39 44 3.1 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 40 41 3.0 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 41 43 3.1 -9 684.70 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 08 42 44 3.2 -9 684.70 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 43 43 3.0 -9 684.70 -55.0 -55.3 -54.9 63 -99 SPO 1997 10 06 08 44 41 3.1 -9 684.70 -55.1 -55.3 -54.9 64 -99 SPO 1997 10 06 08 45 38 2.6 -9 684.80 -55.0 -55.3 -54.9 62 -99 SPO 1997 10 06 08 46 37 2.6 -9 684.80 -55.0 -55.3 -54.8 62 -99 SPO 1997 10 06 08 47 38 2.8 -9 684.80 -55.0 -55.3 -54.8 62 -99 SPO 1997 10 06 08 48 39 2.7 -9 684.80 -55.0 -55.3 -54.8 62 -99 SPO 1997 10 06 08 49 39 2.5 -9 684.80 -55.0 -55.3 -54.8 62 -99 SPO 1997 10 06 08 50 37 2.9 -9 684.80 -55.0 -55.3 -54.8 63 -99 SPO 1997 10 06 08 51 35 2.9 -9 684.80 -55.0 -55.2 -54.8 63 -99 SPO 1997 10 06 08 52 37 3.0 -9 684.80 -55.0 -55.2 -54.8 64 -99 SPO 1997 10 06 08 53 35 2.9 -9 684.80 -55.0 -55.2 -54.8 64 -99 SPO 1997 10 06 08 54 38 3.0 -9 684.80 -54.9 -55.2 -54.8 63 -99 SPO 1997 10 06 08 55 37 3.3 -9 684.70 -54.9 -55.2 -54.8 64 -99 SPO 1997 10 06 08 56 32 2.8 -9 684.80 -54.9 -55.1 -54.8 64 -99 SPO 1997 10 06 08 57 33 2.6 -9 684.80 -54.9 -55.2 -54.8 63 -99 SPO 1997 10 06 08 58 32 2.7 -9 684.80 -54.9 -55.2 -54.8 62 -99 SPO 1997 10 06 08 59 33 2.7 -9 684.80 -55.0 -55.2 -54.9 63 -99 SPO 1997 10 06 09 00 37 3.1 -9 684.80 -55.0 -55.2 -54.9 63 0 SPO 1997 10 06 09 01 38 2.9 -9 684.80 -55.0 -55.2 -54.9 62 -99 SPO 1997 10 06 09 02 42 2.9 -9 684.80 -55.1 -55.3 -54.9 63 -99 SPO 1997 10 06 09 03 42 3.0 -9 684.80 -55.1 -55.2 -55.0 64 -99 SPO 1997 10 06 09 04 41 2.8 -9 684.80 -55.2 -55.2 -55.0 64 -99 SPO 1997 10 06 09 05 41 3.1 -9 684.80 -55.2 -55.2 -55.0 64 -99 SPO 1997 10 06 09 06 42 3.0 -9 684.80 -55.3 -55.2 -55.0 64 -99 SPO 1997 10 06 09 07 41 3.2 -9 684.80 -55.3 -55.2 -55.0 64 -99 SPO 1997 10 06 09 08 43 3.4 -9 684.80 -55.3 -55.2 -55.0 64 -99 SPO 1997 10 06 09 09 44 3.3 -9 684.80 -55.3 -55.2 -55.0 63 -99 SPO 1997 10 06 09 10 45 3.4 -9 684.80 -55.4 -55.2 -55.1 63 -99 SPO 1997 10 06 09 11 46 3.6 -9 684.70 -55.4 -55.2 -55.2 62 -99 SPO 1997 10 06 09 12 45 3.6 -9 684.80 -55.5 -55.2 -55.2 63 -99 SPO 1997 10 06 09 13 45 3.5 -9 684.80 -55.5 -55.2 -55.2 62 -99 SPO 1997 10 06 09 14 44 3.2 -9 684.80 -55.5 -55.2 -55.2 62 -99 SPO 1997 10 06 09 15 45 3.3 -9 684.80 -55.6 -55.2 -55.2 62 -99 SPO 1997 10 06 09 16 43 3.5 -9 684.80 -55.7 -55.2 -55.2 64 -99 SPO 1997 10 06 09 17 44 3.7 -9 684.80 -55.7 -55.2 -55.2 63 -99 SPO 1997 10 06 09 18 46 3.7 -9 684.80 -55.8 -55.2 -55.1 64 -99 SPO 1997 10 06 09 19 47 3.6 -9 684.80 -55.8 -55.2 -55.2 64 -99 SPO 1997 10 06 09 20 49 3.5 -9 684.80 -55.9 -55.2 -55.3 64 -99 SPO 1997 10 06 09 21 52 3.5 -9 684.90 -55.9 -55.2 -55.3 63 -99 SPO 1997 10 06 09 22 53 3.6 -9 684.90 -55.9 -55.2 -55.3 62 -99 SPO 1997 10 06 09 23 52 3.7 -9 684.90 -55.9 -55.1 -55.2 62 -99 SPO 1997 10 06 09 24 53 3.6 -9 684.90 -55.9 -55.1 -55.1 62 -99 SPO 1997 10 06 09 25 55 3.8 -9 684.90 -56.0 -55.1 -55.2 63 -99 SPO 1997 10 06 09 26 55 4.0 -9 684.80 -56.0 -55.0 -55.2 63 -99 SPO 1997 10 06 09 27 55 4.0 -9 684.80 -56.0 -55.0 -55.4 63 -99 SPO 1997 10 06 09 28 55 3.7 -9 684.90 -56.1 -55.1 -55.4 64 -99 SPO 1997 10 06 09 29 58 3.3 -9 685.00 -56.1 -55.1 -55.3 64 -99 SPO 1997 10 06 09 30 57 3.5 -9 685.00 -56.1 -55.0 -55.2 64 -99 SPO 1997 10 06 09 31 58 3.3 -9 685.00 -56.1 -55.0 -55.1 64 -99 SPO 1997 10 06 09 32 61 3.3 -9 685.00 -56.1 -55.0 -55.1 64 -99 SPO 1997 10 06 09 33 63 3.5 -9 685.00 -56.1 -55.0 -55.2 64 -99 SPO 1997 10 06 09 34 61 3.4 -9 685.00 -56.2 -55.0 -55.2 64 -99 SPO 1997 10 06 09 35 59 3.4 -9 685.00 -56.3 -55.0 -55.2 65 -99 SPO 1997 10 06 09 36 59 3.4 -9 685.00 -56.2 -55.1 -55.2 64 -99 SPO 1997 10 06 09 37 57 3.5 -9 685.00 -56.2 -55.1 -55.2 64 -99 SPO 1997 10 06 09 38 57 3.5 -9 685.00 -56.3 -55.2 -55.2 65 -99 SPO 1997 10 06 09 39 57 3.8 -9 685.00 -56.3 -55.3 -55.2 65 -99 SPO 1997 10 06 09 40 56 3.8 -9 685.00 -56.3 -55.2 -55.3 64 -99 SPO 1997 10 06 09 41 53 3.8 -9 685.00 -56.3 -55.0 -55.3 64 -99 SPO 1997 10 06 09 42 51 3.7 -9 685.00 -56.4 -54.8 -55.2 65 -99 SPO 1997 10 06 09 43 50 3.6 -9 685.00 -56.4 -54.8 -55.2 65 -99 SPO 1997 10 06 09 44 50 3.3 -9 685.10 -56.4 -54.9 -55.2 65 -99 SPO 1997 10 06 09 45 50 3.2 -9 685.10 -56.4 -55.0 -55.1 65 -99 SPO 1997 10 06 09 46 51 3.4 -9 685.10 -56.4 -55.0 -55.2 64 -99 SPO 1997 10 06 09 47 51 3.5 -9 685.10 -56.4 -55.1 -55.4 64 -99 SPO 1997 10 06 09 48 53 3.5 -9 685.10 -56.4 -55.2 -55.6 64 -99 SPO 1997 10 06 09 49 54 3.5 -9 685.10 -56.5 -55.2 -55.7 65 -99 SPO 1997 10 06 09 50 54 3.5 -9 685.10 -56.5 -55.2 -55.6 64 -99 SPO 1997 10 06 09 51 55 3.6 -9 685.10 -56.5 -55.4 -55.6 64 -99 SPO 1997 10 06 09 52 54 3.8 -9 685.10 -56.6 -55.5 -55.6 65 -99 SPO 1997 10 06 09 53 56 3.9 -9 685.10 -56.6 -55.5 -55.6 65 -99 SPO 1997 10 06 09 54 57 3.8 -9 685.10 -56.6 -55.5 -55.6 65 -99 SPO 1997 10 06 09 55 57 3.9 -9 685.10 -56.6 -55.5 -55.8 64 -99 SPO 1997 10 06 09 56 57 3.9 -9 685.20 -56.7 -55.6 -55.9 65 -99 SPO 1997 10 06 09 57 57 3.9 -9 685.10 -56.8 -55.6 -56.0 66 -99 SPO 1997 10 06 09 58 55 3.7 -9 685.20 -56.8 -55.6 -56.0 65 -99 SPO 1997 10 06 09 59 54 3.8 -9 685.20 -56.8 -55.6 -55.8 64 -99 SPO 1997 10 06 10 00 55 3.7 -9 685.20 -56.8 -55.5 -55.8 64 0 SPO 1997 10 06 10 01 53 3.7 -9 685.20 -56.8 -55.5 -55.8 63 -99 SPO 1997 10 06 10 02 52 3.6 -9 685.20 -56.8 -55.5 -55.9 63 -99 SPO 1997 10 06 10 03 50 3.6 -9 685.20 -56.8 -55.4 -55.8 62 -99 SPO 1997 10 06 10 04 49 3.7 -9 685.20 -56.8 -55.3 -55.7 64 -99 SPO 1997 10 06 10 05 49 3.9 -9 685.20 -56.7 -55.2 -55.7 63 -99 SPO 1997 10 06 10 06 48 3.8 -9 685.20 -56.7 -55.2 -55.7 64 -99 SPO 1997 10 06 10 07 48 3.9 -9 685.10 -56.7 -55.2 -55.7 64 -99 SPO 1997 10 06 10 08 47 4.2 -9 685.10 -56.7 -55.0 -55.7 64 -99 SPO 1997 10 06 10 09 48 4.4 -9 685.00 -56.7 -55.0 -55.8 64 -99 SPO 1997 10 06 10 10 49 4.4 -9 685.00 -56.7 -55.1 -55.8 65 -99 SPO 1997 10 06 10 11 48 4.4 -9 685.10 -56.7 -55.2 -55.8 65 -99 SPO 1997 10 06 10 12 47 4.4 -9 685.00 -56.8 -55.1 -55.8 65 -99 SPO 1997 10 06 10 13 47 4.3 -9 685.00 -56.7 -55.2 -55.8 64 -99 SPO 1997 10 06 10 14 48 4.3 -9 685.10 -56.7 -55.2 -55.8 64 -99 SPO 1997 10 06 10 15 47 4.0 -9 685.10 -56.7 -55.2 -55.8 64 -99 SPO 1997 10 06 10 16 49 4.1 -9 685.10 -56.7 -55.2 -55.8 64 -99 SPO 1997 10 06 10 17 48 4.5 -9 685.20 -56.7 -55.0 -56.0 64 -99 SPO 1997 10 06 10 18 48 4.5 -9 685.20 -56.7 -54.9 -56.0 64 -99 SPO 1997 10 06 10 19 48 4.3 -9 685.10 -56.7 -55.0 -56.1 64 -99 SPO 1997 10 06 10 20 49 4.0 -9 685.20 -56.7 -55.0 -56.1 64 -99 SPO 1997 10 06 10 21 49 3.8 -9 685.20 -56.8 -55.2 -56.2 64 -99 SPO 1997 10 06 10 22 48 3.8 -9 685.10 -56.9 -55.3 -56.3 65 -99 SPO 1997 10 06 10 23 50 3.8 -9 685.10 -57.0 -55.4 -56.4 65 -99 SPO 1997 10 06 10 24 51 3.8 -9 685.10 -57.0 -55.4 -56.4 64 -99 SPO 1997 10 06 10 25 51 3.6 -9 685.10 -57.1 -55.5 -56.4 64 -99 SPO 1997 10 06 10 26 54 3.4 -9 685.20 -57.1 -55.6 -56.4 63 -99 SPO 1997 10 06 10 27 54 3.4 -9 685.20 -57.1 -55.7 -56.4 63 -99 SPO 1997 10 06 10 28 54 3.2 -9 685.20 -57.2 -55.6 -56.4 63 -99 SPO 1997 10 06 10 29 57 3.1 -9 685.20 -57.2 -55.6 -56.4 63 -99 SPO 1997 10 06 10 30 55 3.2 -9 685.20 -57.2 -55.7 -56.4 63 -99 SPO 1997 10 06 10 31 56 3.4 -9 685.20 -57.3 -55.6 -56.5 63 -99 SPO 1997 10 06 10 32 57 3.5 -9 685.20 -57.3 -55.6 -56.5 63 -99 SPO 1997 10 06 10 33 58 3.3 -9 685.20 -57.3 -55.6 -56.5 63 -99 SPO 1997 10 06 10 34 59 3.5 -9 685.20 -57.4 -55.6 -56.5 63 -99 SPO 1997 10 06 10 35 59 3.7 -9 685.10 -57.4 -55.6 -56.6 63 -99 SPO 1997 10 06 10 36 58 3.6 -9 685.20 -57.4 -55.6 -56.6 63 -99 SPO 1997 10 06 10 37 58 4.0 -9 685.20 -57.4 -55.7 -56.6 63 -99 SPO 1997 10 06 10 38 57 4.0 -9 685.20 -57.4 -55.6 -56.6 62 -99 SPO 1997 10 06 10 39 58 3.9 -9 685.20 -57.4 -55.5 -56.6 62 -99 SPO 1997 10 06 10 40 58 3.8 -9 685.20 -57.4 -55.6 -56.5 62 -99 SPO 1997 10 06 10 41 58 3.9 -9 685.20 -57.4 -55.6 -56.5 63 -99 SPO 1997 10 06 10 42 58 4.0 -9 685.20 -57.5 -55.5 -56.6 64 -99 SPO 1997 10 06 10 43 59 4.3 -9 685.20 -57.4 -55.5 -56.6 63 -99 SPO 1997 10 06 10 44 60 4.3 -9 685.20 -57.4 -55.5 -56.6 64 -99 SPO 1997 10 06 10 45 58 4.2 -9 685.20 -57.5 -55.4 -56.7 65 -99 SPO 1997 10 06 10 46 59 4.3 -9 685.20 -57.5 -55.2 -56.7 65 -99 SPO 1997 10 06 10 47 61 4.3 -9 685.20 -57.5 -55.4 -56.7 66 -99 SPO 1997 10 06 10 48 60 4.4 -9 685.20 -57.5 -55.4 -56.7 65 -99 SPO 1997 10 06 10 49 59 4.2 -9 685.20 -57.5 -55.2 -56.6 64 -99 SPO 1997 10 06 10 50 62 4.0 -9 685.30 -57.5 -55.2 -56.6 64 -99 SPO 1997 10 06 10 51 63 3.9 -9 685.30 -57.5 -55.3 -56.5 63 -99 SPO 1997 10 06 10 52 62 3.9 -9 685.30 -57.5 -55.4 -56.5 63 -99 SPO 1997 10 06 10 53 64 3.8 -9 685.40 -57.5 -55.5 -56.5 63 -99 SPO 1997 10 06 10 54 63 3.8 -9 685.40 -57.5 -55.6 -56.5 64 -99 SPO 1997 10 06 10 55 63 3.7 -9 685.40 -57.4 -55.6 -56.5 63 -99 SPO 1997 10 06 10 56 63 3.7 -9 685.40 -57.4 -55.5 -56.5 64 -99 SPO 1997 10 06 10 57 62 3.7 -9 685.40 -57.5 -55.4 -56.5 65 -99 SPO 1997 10 06 10 58 64 3.9 -9 685.40 -57.5 -55.5 -56.6 66 -99 SPO 1997 10 06 10 59 65 3.9 -9 685.40 -57.6 -55.6 -56.8 67 -99 SPO 1997 10 06 11 00 61 3.9 -9 685.40 -57.7 -55.6 -57.0 67 0 SPO 1997 10 06 11 01 62 3.9 -9 685.40 -57.7 -55.6 -57.1 67 -99 SPO 1997 10 06 11 02 62 3.7 -9 685.40 -57.8 -55.6 -57.2 67 -99 SPO 1997 10 06 11 03 60 3.7 -9 685.40 -57.8 -55.6 -57.2 65 -99 SPO 1997 10 06 11 04 62 3.6 -9 685.40 -57.9 -55.7 -57.2 64 -99 SPO 1997 10 06 11 05 61 3.6 -9 685.50 -57.9 -55.7 -57.0 62 -99 SPO 1997 10 06 11 06 61 3.6 -9 685.50 -57.8 -55.6 -57.0 61 -99 SPO 1997 10 06 11 07 62 3.6 -9 685.50 -57.8 -55.6 -56.8 61 -99 SPO 1997 10 06 11 08 61 3.5 -9 685.50 -57.7 -55.6 -56.8 60 -99 SPO 1997 10 06 11 09 64 3.3 -9 685.60 -57.7 -55.6 -56.7 60 -99 SPO 1997 10 06 11 10 66 3.3 -9 685.60 -57.7 -55.6 -56.6 61 -99 SPO 1997 10 06 11 11 67 3.4 -9 685.60 -57.8 -55.7 -56.6 63 -99 SPO 1997 10 06 11 12 67 3.6 -9 685.60 -57.8 -55.7 -56.6 65 -99 SPO 1997 10 06 11 13 67 3.8 -9 685.60 -57.8 -55.7 -56.7 65 -99 SPO 1997 10 06 11 14 68 3.8 -9 685.60 -57.9 -55.7 -56.7 66 -99 SPO 1997 10 06 11 15 70 4.0 -9 685.60 -57.9 -55.8 -56.7 65 -99 SPO 1997 10 06 11 16 71 4.0 -9 685.60 -57.9 -55.9 -56.7 64 -99 SPO 1997 10 06 11 17 70 3.8 -9 685.70 -58.0 -55.9 -56.7 63 -99 SPO 1997 10 06 11 18 69 3.9 -9 685.60 -58.0 -55.8 -56.8 63 -99 SPO 1997 10 06 11 19 70 4.0 -9 685.60 -57.9 -55.8 -56.8 62 -99 SPO 1997 10 06 11 20 72 3.9 -9 685.60 -57.9 -55.9 -56.8 64 -99 SPO 1997 10 06 11 21 71 3.8 -9 685.70 -57.9 -55.9 -56.7 65 -99 SPO 1997 10 06 11 22 71 3.5 -9 685.70 -57.8 -55.8 -56.6 64 -99 SPO 1997 10 06 11 23 70 3.5 -9 685.70 -57.8 -55.8 -56.6 65 -99 SPO 1997 10 06 11 24 69 3.4 -9 685.80 -57.8 -55.9 -56.6 65 -99 SPO 1997 10 06 11 25 70 3.3 -9 685.80 -57.7 -55.9 -56.4 65 -99 SPO 1997 10 06 11 26 68 3.3 -9 685.70 -57.7 -55.8 -56.5 65 -99 SPO 1997 10 06 11 27 67 3.4 -9 685.80 -57.7 -55.7 -56.5 66 -99 SPO 1997 10 06 11 28 66 3.6 -9 685.80 -57.6 -55.8 -56.6 64 -99 SPO 1997 10 06 11 29 64 3.5 -9 685.80 -57.6 -55.9 -56.7 65 -99 SPO 1997 10 06 11 30 63 3.7 -9 685.80 -57.6 -55.8 -56.7 65 -99 SPO 1997 10 06 11 31 65 3.6 -9 685.80 -57.7 -55.9 -56.8 66 -99 SPO 1997 10 06 11 32 65 3.6 -9 685.80 -57.7 -55.9 -56.9 66 -99 SPO 1997 10 06 11 33 65 3.8 -9 685.80 -57.6 -55.9 -56.8 65 -99 SPO 1997 10 06 11 34 65 3.8 -9 685.80 -57.6 -55.8 -56.7 65 -99 SPO 1997 10 06 11 35 64 3.9 -9 685.80 -57.5 -55.6 -56.6 64 -99 SPO 1997 10 06 11 36 66 4.1 -9 685.80 -57.5 -55.7 -56.6 64 -99 SPO 1997 10 06 11 37 66 4.0 -9 685.80 -57.4 -55.8 -56.6 64 -99 SPO 1997 10 06 11 38 66 4.1 -9 685.80 -57.4 -55.8 -56.6 64 -99 SPO 1997 10 06 11 39 64 4.0 -9 685.90 -57.3 -55.8 -56.6 64 -99 SPO 1997 10 06 11 40 66 4.0 -9 685.90 -57.2 -55.8 -56.5 63 -99 SPO 1997 10 06 11 41 67 4.0 -9 685.80 -57.2 -55.9 -56.5 64 -99 SPO 1997 10 06 11 42 68 4.2 -9 685.80 -57.2 -56.0 -56.7 65 -99 SPO 1997 10 06 11 43 65 4.1 -9 685.80 -57.2 -56.1 -56.8 66 -99 SPO 1997 10 06 11 44 65 4.1 -9 685.80 -57.2 -56.1 -56.8 66 -99 SPO 1997 10 06 11 45 64 4.1 -9 685.80 -57.1 -56.1 -56.8 66 -99 SPO 1997 10 06 11 46 63 4.1 -9 685.80 -57.1 -56.1 -56.8 65 -99 SPO 1997 10 06 11 47 64 4.4 -9 685.90 -57.1 -56.0 -56.8 65 -99 SPO 1997 10 06 11 48 64 4.4 -9 685.90 -57.0 -56.3 -56.8 64 -99 SPO 1997 10 06 11 49 65 4.4 -9 685.90 -57.1 -56.3 -56.8 65 -99 SPO 1997 10 06 11 50 62 4.6 -9 685.90 -57.0 -56.0 -56.8 63 -99 SPO 1997 10 06 11 51 62 4.6 -9 685.90 -57.0 -56.0 -56.8 63 -99 SPO 1997 10 06 11 52 63 4.7 -9 685.90 -57.0 -56.0 -56.8 63 -99 SPO 1997 10 06 11 53 61 4.8 -9 685.80 -57.0 -55.8 -56.8 63 -99 SPO 1997 10 06 11 54 60 4.6 -9 685.80 -57.0 -55.9 -56.8 63 -99 SPO 1997 10 06 11 55 58 4.4 -9 685.80 -57.0 -55.8 -56.8 63 -99 SPO 1997 10 06 11 56 56 4.6 -9 685.80 -57.0 -55.8 -56.8 63 -99 SPO 1997 10 06 11 57 54 4.4 -9 685.80 -57.0 -55.8 -56.8 63 -99 SPO 1997 10 06 11 58 56 4.2 -9 685.80 -56.9 -55.7 -56.8 63 -99 SPO 1997 10 06 11 59 60 4.0 -9 685.80 -56.9 -56.0 -56.8 63 -99 SPO 1997 10 06 12 00 59 4.2 -9 685.80 -56.9 -56.1 -56.8 63 0 SPO 1997 10 06 12 01 57 4.2 -9 685.90 -56.8 -56.2 -56.8 63 -99 SPO 1997 10 06 12 02 56 4.1 -9 685.80 -56.8 -56.2 -56.8 62 -99 SPO 1997 10 06 12 03 57 4.0 -9 685.80 -56.8 -56.3 -56.7 62 -99 SPO 1997 10 06 12 04 55 4.2 -9 685.80 -56.8 -56.3 -56.7 62 -99 SPO 1997 10 06 12 05 55 4.1 -9 685.80 -56.7 -56.3 -56.7 61 -99 SPO 1997 10 06 12 06 57 4.2 -9 685.80 -56.6 -56.2 -56.6 60 -99 SPO 1997 10 06 12 07 59 4.4 -9 685.80 -56.5 -56.4 -56.6 61 -99 SPO 1997 10 06 12 08 60 4.7 -9 685.80 -56.6 -56.5 -56.6 62 -99 SPO 1997 10 06 12 09 60 4.5 -9 685.80 -56.6 -56.6 -56.6 62 -99 SPO 1997 10 06 12 10 61 4.3 -9 685.80 -56.6 -56.6 -56.6 64 -99 SPO 1997 10 06 12 11 56 4.2 -9 685.90 -56.6 -56.6 -56.6 64 -99 SPO 1997 10 06 12 12 55 4.0 -9 685.90 -56.6 -56.6 -56.6 64 -99 SPO 1997 10 06 12 13 56 4.0 -9 685.90 -56.5 -56.6 -56.5 64 -99 SPO 1997 10 06 12 14 54 3.8 -9 685.90 -56.5 -56.6 -56.5 64 -99 SPO 1997 10 06 12 15 53 3.7 -9 686.00 -56.4 -56.4 -56.4 63 -99 SPO 1997 10 06 12 16 55 3.9 -9 686.00 -56.4 -56.3 -56.4 63 -99 SPO 1997 10 06 12 17 58 4.0 -9 686.00 -56.4 -56.4 -56.4 63 -99 SPO 1997 10 06 12 18 53 3.8 -9 686.00 -56.3 -56.4 -56.4 62 -99 SPO 1997 10 06 12 19 52 3.9 -9 686.00 -56.3 -56.4 -56.3 62 -99 SPO 1997 10 06 12 20 50 4.0 -9 686.00 -56.2 -56.5 -56.3 61 -99 SPO 1997 10 06 12 21 49 3.9 -9 686.00 -56.2 -56.5 -56.2 62 -99 SPO 1997 10 06 12 22 52 3.9 -9 686.10 -56.2 -56.4 -56.2 63 -99 SPO 1997 10 06 12 23 53 3.8 -9 686.10 -56.2 -56.4 -56.2 64 -99 SPO 1997 10 06 12 24 55 3.9 -9 686.10 -56.1 -56.3 -56.2 63 -99 SPO 1997 10 06 12 25 54 3.9 -9 686.10 -56.1 -56.3 -56.1 64 -99 SPO 1997 10 06 12 26 51 3.4 -9 686.10 -56.1 -56.3 -56.1 64 -99 SPO 1997 10 06 12 27 54 3.4 -9 686.20 -56.0 -56.3 -56.0 63 -99 SPO 1997 10 06 12 28 51 3.6 -9 686.20 -56.0 -56.3 -56.0 63 -99 SPO 1997 10 06 12 29 54 3.7 -9 686.20 -56.0 -56.2 -56.0 62 -99 SPO 1997 10 06 12 30 55 3.9 -9 686.20 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 12 31 54 4.0 -9 686.20 -56.0 -56.3 -56.1 62 -99 SPO 1997 10 06 12 32 53 3.9 -9 686.20 -56.1 -56.3 -56.1 63 -99 SPO 1997 10 06 12 33 52 4.1 -9 686.20 -56.1 -56.3 -56.1 62 -99 SPO 1997 10 06 12 34 50 4.0 -9 686.20 -56.1 -56.4 -56.1 62 -99 SPO 1997 10 06 12 35 50 4.1 -9 686.20 -56.1 -56.4 -56.1 62 -99 SPO 1997 10 06 12 36 52 4.1 -9 686.20 -56.1 -56.5 -56.1 63 -99 SPO 1997 10 06 12 37 53 4.3 -9 686.20 -56.2 -56.5 -56.2 64 -99 SPO 1997 10 06 12 38 55 4.1 -9 686.20 -56.2 -56.5 -56.2 64 -99 SPO 1997 10 06 12 39 54 4.0 -9 686.20 -56.3 -56.5 -56.2 64 -99 SPO 1997 10 06 12 40 56 4.2 -9 686.20 -56.3 -56.6 -56.3 64 -99 SPO 1997 10 06 12 41 54 4.0 -9 686.20 -56.3 -56.6 -56.3 63 -99 SPO 1997 10 06 12 42 57 4.1 -9 686.20 -56.4 -56.6 -56.4 62 -99 SPO 1997 10 06 12 43 55 4.1 -9 686.20 -56.4 -56.6 -56.4 62 -99 SPO 1997 10 06 12 44 53 4.1 -9 686.20 -56.5 -56.7 -56.5 62 -99 SPO 1997 10 06 12 45 53 4.1 -9 686.30 -56.6 -56.7 -56.5 63 -99 SPO 1997 10 06 12 46 51 4.2 -9 686.20 -56.6 -56.7 -56.5 63 -99 SPO 1997 10 06 12 47 53 4.0 -9 686.30 -56.7 -56.7 -56.6 63 -99 SPO 1997 10 06 12 48 48 3.7 -9 686.30 -56.7 -56.8 -56.6 62 -99 SPO 1997 10 06 12 49 50 4.0 -9 686.30 -56.7 -56.7 -56.6 61 -99 SPO 1997 10 06 12 50 49 4.1 -9 686.20 -56.8 -56.8 -56.7 62 -99 SPO 1997 10 06 12 51 51 3.9 -9 686.20 -56.9 -56.9 -56.8 63 -99 SPO 1997 10 06 12 52 51 3.7 -9 686.30 -56.9 -56.9 -56.8 62 -99 SPO 1997 10 06 12 53 53 3.9 -9 686.30 -56.9 -56.9 -56.8 62 -99 SPO 1997 10 06 12 54 51 4.0 -9 686.30 -57.0 -56.9 -56.8 62 -99 SPO 1997 10 06 12 55 54 4.1 -9 686.20 -57.0 -56.9 -56.9 62 -99 SPO 1997 10 06 12 56 55 4.3 -9 686.20 -57.0 -56.8 -56.9 61 -99 SPO 1997 10 06 12 57 57 4.3 -9 686.30 -57.0 -56.8 -56.9 62 -99 SPO 1997 10 06 12 58 54 4.0 -9 686.30 -57.1 -56.9 -57.0 63 -99 SPO 1997 10 06 12 59 57 4.1 -9 686.30 -57.1 -56.9 -57.0 63 -99 SPO 1997 10 06 13 00 56 4.2 -9 686.30 -57.1 -56.9 -57.0 62 0 SPO 1997 10 06 13 01 57 4.7 -9 686.30 -57.1 -56.9 -57.0 62 -99 SPO 1997 10 06 13 02 57 5.0 -9 686.20 -57.2 -56.9 -57.0 63 -99 SPO 1997 10 06 13 03 57 5.0 -9 686.20 -57.2 -56.8 -57.1 63 -99 SPO 1997 10 06 13 04 56 4.9 -9 686.20 -57.2 -56.8 -57.1 63 -99 SPO 1997 10 06 13 05 56 4.8 -9 686.20 -57.2 -56.8 -57.1 63 -99 SPO 1997 10 06 13 06 55 4.6 -9 686.20 -57.2 -56.8 -57.1 63 -99 SPO 1997 10 06 13 07 54 4.7 -9 686.20 -57.2 -56.9 -57.1 62 -99 SPO 1997 10 06 13 08 56 4.8 -9 686.20 -57.2 -56.9 -57.1 62 -99 SPO 1997 10 06 13 09 55 4.7 -9 686.20 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 10 58 4.6 -9 686.30 -57.2 -56.9 -57.0 63 -99 SPO 1997 10 06 13 11 58 4.6 -9 686.30 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 12 58 4.5 -9 686.30 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 13 58 4.4 -9 686.30 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 14 58 4.5 -9 686.30 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 15 57 4.8 -9 686.30 -57.2 -56.8 -57.0 63 -99 SPO 1997 10 06 13 16 58 4.7 -9 686.30 -57.1 -56.8 -57.0 63 -99 SPO 1997 10 06 13 17 59 4.6 -9 686.30 -57.1 -56.8 -57.0 63 -99 SPO 1997 10 06 13 18 58 4.7 -9 686.30 -57.1 -56.8 -56.9 63 -99 SPO 1997 10 06 13 19 59 4.4 -9 686.40 -57.1 -56.9 -56.9 62 -99 SPO 1997 10 06 13 20 60 4.3 -9 686.40 -57.1 -56.9 -56.9 62 -99 SPO 1997 10 06 13 21 60 4.2 -9 686.40 -57.0 -56.9 -56.9 61 -99 SPO 1997 10 06 13 22 58 4.2 -9 686.40 -57.0 -56.9 -56.8 61 -99 SPO 1997 10 06 13 23 56 4.2 -9 686.40 -57.0 -57.0 -56.7 62 -99 SPO 1997 10 06 13 24 59 4.3 -9 686.50 -56.9 -57.0 -56.7 61 -99 SPO 1997 10 06 13 25 58 4.4 -9 686.50 -56.9 -57.0 -56.7 62 -99 SPO 1997 10 06 13 26 58 4.3 -9 686.40 -56.9 -57.0 -56.7 63 -99 SPO 1997 10 06 13 27 58 4.8 -9 686.40 -56.9 -57.0 -56.7 63 -99 SPO 1997 10 06 13 28 56 4.6 -9 686.40 -56.9 -57.0 -56.7 63 -99 SPO 1997 10 06 13 29 55 4.8 -9 686.30 -56.9 -57.0 -56.7 63 -99 SPO 1997 10 06 13 30 54 4.9 -9 686.30 -56.9 -56.9 -56.7 63 -99 SPO 1997 10 06 13 31 54 4.8 -9 686.30 -56.8 -56.9 -56.6 62 -99 SPO 1997 10 06 13 32 54 4.8 -9 686.30 -56.8 -56.9 -56.6 63 -99 SPO 1997 10 06 13 33 56 5.0 -9 686.30 -56.8 -56.8 -56.6 63 -99 SPO 1997 10 06 13 34 54 4.8 -9 686.30 -56.8 -56.7 -56.6 64 -99 SPO 1997 10 06 13 35 53 4.7 -9 686.30 -56.7 -56.6 -56.6 63 -99 SPO 1997 10 06 13 36 54 4.5 -9 686.30 -56.7 -56.6 -56.6 63 -99 SPO 1997 10 06 13 37 54 4.6 -9 686.30 -56.7 -56.5 -56.6 63 -99 SPO 1997 10 06 13 38 55 4.8 -9 686.40 -56.6 -56.5 -56.5 62 -99 SPO 1997 10 06 13 39 54 4.8 -9 686.40 -56.6 -56.5 -56.5 62 -99 SPO 1997 10 06 13 40 55 4.6 -9 686.40 -56.6 -56.6 -56.5 62 -99 SPO 1997 10 06 13 41 56 4.5 -9 686.40 -56.5 -56.6 -56.4 61 -99 SPO 1997 10 06 13 42 56 4.7 -9 686.40 -56.5 -56.6 -56.5 61 -99 SPO 1997 10 06 13 43 57 4.6 -9 686.40 -56.5 -56.7 -56.4 61 -99 SPO 1997 10 06 13 44 58 4.6 -9 686.40 -56.5 -56.6 -56.5 62 -99 SPO 1997 10 06 13 45 58 4.5 -9 686.40 -56.5 -56.6 -56.4 63 -99 SPO 1997 10 06 13 46 57 4.8 -9 686.40 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 13 47 59 4.7 -9 686.50 -56.5 -56.7 -56.4 63 -99 SPO 1997 10 06 13 48 59 4.2 -9 686.50 -56.5 -56.7 -56.4 64 -99 SPO 1997 10 06 13 49 61 4.2 -9 686.50 -56.5 -56.7 -56.4 64 -99 SPO 1997 10 06 13 50 59 4.0 -9 686.50 -56.5 -56.7 -56.4 64 -99 SPO 1997 10 06 13 51 61 4.1 -9 686.60 -56.4 -56.6 -56.4 63 -99 SPO 1997 10 06 13 52 62 4.2 -9 686.60 -56.4 -56.7 -56.4 63 -99 SPO 1997 10 06 13 53 62 4.0 -9 686.60 -56.5 -56.7 -56.4 63 -99 SPO 1997 10 06 13 54 63 3.7 -9 686.60 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 13 55 61 3.8 -9 686.50 -56.5 -56.7 -56.4 62 -99 SPO 1997 10 06 13 56 62 4.0 -9 686.60 -56.4 -56.7 -56.4 61 -99 SPO 1997 10 06 13 57 61 3.7 -9 686.60 -56.5 -56.8 -56.4 63 -99 SPO 1997 10 06 13 58 62 3.8 -9 686.60 -56.4 -56.8 -56.4 62 -99 SPO 1997 10 06 13 59 62 4.1 -9 686.50 -56.4 -56.8 -56.4 63 -99 SPO 1997 10 06 14 00 63 4.2 -9 686.50 -56.4 -56.8 -56.4 63 0 SPO 1997 10 06 14 01 63 4.3 -9 686.50 -56.4 -56.8 -56.4 63 -99 SPO 1997 10 06 14 02 60 4.2 -9 686.50 -56.4 -56.8 -56.4 63 -99 SPO 1997 10 06 14 03 61 3.7 -9 686.60 -56.5 -56.8 -56.4 64 -99 SPO 1997 10 06 14 04 60 4.0 -9 686.60 -56.4 -56.7 -56.4 63 -99 SPO 1997 10 06 14 05 60 3.9 -9 686.60 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 14 06 61 3.8 -9 686.60 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 14 07 60 3.5 -9 686.60 -56.4 -56.7 -56.3 61 -99 SPO 1997 10 06 14 08 59 4.0 -9 686.60 -56.4 -56.6 -56.3 61 -99 SPO 1997 10 06 14 09 62 3.6 -9 686.60 -56.4 -56.6 -56.3 62 -99 SPO 1997 10 06 14 10 62 4.1 -9 686.60 -56.3 -56.6 -56.3 61 -99 SPO 1997 10 06 14 11 63 4.2 -9 686.60 -56.3 -56.6 -56.3 62 -99 SPO 1997 10 06 14 12 62 4.3 -9 686.60 -56.3 -56.6 -56.3 63 -99 SPO 1997 10 06 14 13 60 4.0 -9 686.60 -56.3 -56.6 -56.2 64 -99 SPO 1997 10 06 14 14 62 3.8 -9 686.60 -56.3 -56.6 -56.2 64 -99 SPO 1997 10 06 14 15 60 3.9 -9 686.60 -56.2 -56.6 -56.2 63 -99 SPO 1997 10 06 14 16 62 4.2 -9 686.60 -56.2 -56.5 -56.2 62 -99 SPO 1997 10 06 14 17 62 4.1 -9 686.60 -56.2 -56.5 -56.2 62 -99 SPO 1997 10 06 14 18 61 4.3 -9 686.50 -56.2 -56.5 -56.2 62 -99 SPO 1997 10 06 14 19 62 4.1 -9 686.50 -56.2 -56.4 -56.2 63 -99 SPO 1997 10 06 14 20 59 4.3 -9 686.50 -56.1 -56.4 -56.1 62 -99 SPO 1997 10 06 14 21 60 4.7 -9 686.50 -56.1 -56.4 -56.1 62 -99 SPO 1997 10 06 14 22 62 4.3 -9 686.50 -56.1 -56.4 -56.1 63 -99 SPO 1997 10 06 14 23 60 3.8 -9 686.50 -56.1 -56.4 -56.1 63 -99 SPO 1997 10 06 14 24 60 3.7 -9 686.50 -56.1 -56.3 -56.0 63 -99 SPO 1997 10 06 14 25 59 3.9 -9 686.50 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 14 26 57 4.2 -9 686.50 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 14 27 58 4.4 -9 686.50 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 14 28 59 4.0 -9 686.50 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 14 29 59 4.0 -9 686.50 -56.0 -56.3 -55.9 61 -99 SPO 1997 10 06 14 30 57 4.3 -9 686.50 -56.0 -56.3 -55.9 61 -99 SPO 1997 10 06 14 31 59 4.3 -9 686.50 -56.0 -56.3 -55.9 62 -99 SPO 1997 10 06 14 32 59 3.9 -9 686.60 -56.0 -56.2 -55.9 62 -99 SPO 1997 10 06 14 33 61 3.8 -9 686.60 -55.9 -56.3 -55.9 62 -99 SPO 1997 10 06 14 34 60 3.9 -9 686.60 -55.9 -56.2 -55.9 62 -99 SPO 1997 10 06 14 35 62 3.8 -9 686.70 -55.9 -56.2 -55.9 62 -99 SPO 1997 10 06 14 36 62 3.8 -9 686.70 -55.9 -56.2 -55.9 63 -99 SPO 1997 10 06 14 37 61 3.4 -9 686.80 -55.9 -56.1 -55.9 64 -99 SPO 1997 10 06 14 38 63 3.5 -9 686.80 -55.9 -56.1 -55.8 64 -99 SPO 1997 10 06 14 39 62 3.6 -9 686.80 -55.9 -56.1 -55.9 63 -99 SPO 1997 10 06 14 40 60 3.6 -9 686.80 -55.9 -56.1 -55.9 62 -99 SPO 1997 10 06 14 41 60 3.5 -9 686.80 -55.9 -56.1 -55.8 62 -99 SPO 1997 10 06 14 42 60 3.5 -9 686.80 -55.8 -56.2 -55.8 61 -99 SPO 1997 10 06 14 43 58 3.4 -9 686.80 -55.8 -56.2 -55.8 61 -99 SPO 1997 10 06 14 44 61 3.7 -9 686.80 -55.9 -56.2 -55.8 63 -99 SPO 1997 10 06 14 45 60 3.7 -9 686.80 -55.9 -56.1 -55.8 63 -99 SPO 1997 10 06 14 46 62 3.7 -9 686.80 -55.8 -56.2 -55.8 63 -99 SPO 1997 10 06 14 47 61 3.8 -9 686.80 -55.9 -56.2 -55.8 64 -99 SPO 1997 10 06 14 48 62 4.0 -9 686.80 -55.9 -56.1 -55.8 65 -99 SPO 1997 10 06 14 49 61 4.1 -9 686.80 -55.8 -56.1 -55.8 64 -99 SPO 1997 10 06 14 50 61 4.2 -9 686.80 -55.7 -56.1 -55.8 63 -99 SPO 1997 10 06 14 51 61 4.3 -9 686.80 -55.8 -56.0 -55.8 63 -99 SPO 1997 10 06 14 52 61 4.2 -9 686.80 -55.8 -56.0 -55.8 62 -99 SPO 1997 10 06 14 53 60 4.6 -9 686.80 -55.7 -56.0 -55.7 61 -99 SPO 1997 10 06 14 54 60 5.0 -9 686.80 -55.8 -56.0 -55.8 62 -99 SPO 1997 10 06 14 55 60 4.4 -9 686.80 -55.7 -56.0 -55.8 61 -99 SPO 1997 10 06 14 56 62 4.8 -9 686.80 -55.7 -56.0 -55.7 61 -99 SPO 1997 10 06 14 57 62 4.4 -9 686.80 -55.7 -56.0 -55.7 62 -99 SPO 1997 10 06 14 58 66 4.6 -9 686.90 -55.7 -56.1 -55.7 63 -99 SPO 1997 10 06 14 59 67 4.2 -9 686.90 -55.8 -56.1 -55.8 64 -99 SPO 1997 10 06 15 00 66 4.2 -9 686.90 -55.8 -56.2 -55.8 64 0 SPO 1997 10 06 15 01 63 4.0 -9 686.90 -55.9 -56.2 -55.8 65 -99 SPO 1997 10 06 15 02 64 4.0 -9 686.90 -55.8 -56.2 -55.8 63 -99 SPO 1997 10 06 15 03 62 4.3 -9 686.80 -55.9 -56.2 -55.8 63 -99 SPO 1997 10 06 15 04 63 4.4 -9 686.80 -55.9 -56.2 -55.8 62 -99 SPO 1997 10 06 15 05 64 4.3 -9 686.80 -55.9 -56.2 -55.8 62 -99 SPO 1997 10 06 15 06 64 4.4 -9 686.80 -55.8 -56.2 -55.9 61 -99 SPO 1997 10 06 15 07 66 4.6 -9 686.90 -55.9 -56.2 -55.9 62 -99 SPO 1997 10 06 15 08 67 3.9 -9 686.90 -55.9 -56.2 -55.9 61 -99 SPO 1997 10 06 15 09 70 3.9 -9 686.90 -56.0 -56.3 -56.0 62 -99 SPO 1997 10 06 15 10 64 3.5 -9 686.90 -56.1 -56.3 -56.0 63 -99 SPO 1997 10 06 15 11 66 3.5 -9 686.90 -56.1 -56.4 -56.0 63 -99 SPO 1997 10 06 15 12 65 3.8 -9 686.90 -56.1 -56.4 -56.1 62 -99 SPO 1997 10 06 15 13 64 3.4 -9 687.00 -56.1 -56.5 -56.1 62 -99 SPO 1997 10 06 15 14 63 3.9 -9 687.00 -56.2 -56.5 -56.1 62 -99 SPO 1997 10 06 15 15 66 3.9 -9 687.00 -56.2 -56.6 -56.1 61 -99 SPO 1997 10 06 15 16 67 4.3 -9 687.00 -56.2 -56.6 -56.1 61 -99 SPO 1997 10 06 15 17 67 4.8 -9 687.00 -56.3 -56.6 -56.2 62 -99 SPO 1997 10 06 15 18 64 5.0 -9 686.90 -56.3 -56.6 -56.2 62 -99 SPO 1997 10 06 15 19 64 5.1 -9 686.90 -56.3 -56.7 -56.2 63 -99 SPO 1997 10 06 15 20 63 5.3 -9 686.90 -56.3 -56.7 -56.3 63 -99 SPO 1997 10 06 15 21 64 5.2 -9 686.90 -56.3 -56.7 -56.3 63 -99 SPO 1997 10 06 15 22 64 4.8 -9 686.90 -56.4 -56.7 -56.3 64 -99 SPO 1997 10 06 15 23 63 5.2 -9 686.90 -56.4 -56.7 -56.4 64 -99 SPO 1997 10 06 15 24 62 5.4 -9 686.90 -56.4 -56.7 -56.4 63 -99 SPO 1997 10 06 15 25 63 5.3 -9 686.90 -56.4 -56.7 -56.4 63 -99 SPO 1997 10 06 15 26 66 4.6 -9 687.00 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 15 27 68 4.3 -9 687.00 -56.4 -56.7 -56.4 61 -99 SPO 1997 10 06 15 28 68 3.7 -9 687.10 -56.4 -56.7 -56.4 61 -99 SPO 1997 10 06 15 29 66 3.5 -9 687.10 -56.4 -56.8 -56.4 61 -99 SPO 1997 10 06 15 30 65 3.5 -9 687.10 -56.4 -56.8 -56.4 61 -99 SPO 1997 10 06 15 31 65 3.1 -9 687.10 -56.5 -56.8 -56.4 61 -99 SPO 1997 10 06 15 32 62 3.9 -9 687.10 -56.5 -56.8 -56.4 61 -99 SPO 1997 10 06 15 33 65 4.1 -9 687.10 -56.5 -56.8 -56.5 62 -99 SPO 1997 10 06 15 34 64 4.1 -9 687.10 -56.5 -56.8 -56.5 62 -99 SPO 1997 10 06 15 35 64 4.2 -9 687.00 -56.5 -56.8 -56.5 62 -99 SPO 1997 10 06 15 36 65 4.7 -9 687.00 -56.5 -56.8 -56.5 62 -99 SPO 1997 10 06 15 37 66 4.6 -9 687.00 -56.6 -56.8 -56.6 63 -99 SPO 1997 10 06 15 38 66 4.2 -9 687.00 -56.6 -56.8 -56.6 62 -99 SPO 1997 10 06 15 39 66 4.1 -9 687.00 -56.6 -56.8 -56.5 62 -99 SPO 1997 10 06 15 40 67 4.4 -9 687.00 -56.6 -56.8 -56.6 61 -99 SPO 1997 10 06 15 41 67 4.4 -9 687.00 -56.6 -56.8 -56.6 61 -99 SPO 1997 10 06 15 42 70 4.2 -9 687.00 -56.6 -56.8 -56.6 61 -99 SPO 1997 10 06 15 43 70 3.8 -9 687.10 -56.5 -56.8 -56.5 61 -99 SPO 1997 10 06 15 44 73 3.7 -9 687.10 -56.5 -56.9 -56.5 62 -99 SPO 1997 10 06 15 45 74 3.5 -9 687.10 -56.6 -56.9 -56.5 63 -99 SPO 1997 10 06 15 46 70 3.8 -9 687.10 -56.5 -56.9 -56.5 62 -99 SPO 1997 10 06 15 47 70 4.2 -9 687.00 -56.6 -56.9 -56.6 63 -99 SPO 1997 10 06 15 48 72 4.1 -9 687.10 -56.6 -56.9 -56.6 64 -99 SPO 1997 10 06 15 49 73 3.8 -9 687.10 -56.5 -56.9 -56.6 62 -99 SPO 1997 10 06 15 50 69 3.7 -9 687.10 -56.5 -56.8 -56.5 61 -99 SPO 1997 10 06 15 51 71 3.6 -9 687.10 -56.5 -56.8 -56.5 61 -99 SPO 1997 10 06 15 52 70 3.5 -9 687.10 -56.5 -56.8 -56.5 61 -99 SPO 1997 10 06 15 53 69 3.6 -9 687.10 -56.5 -56.8 -56.5 61 -99 SPO 1997 10 06 15 54 68 3.8 -9 687.10 -56.5 -56.7 -56.5 62 -99 SPO 1997 10 06 15 55 69 4.0 -9 687.10 -56.5 -56.7 -56.4 63 -99 SPO 1997 10 06 15 56 67 4.1 -9 687.00 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 15 57 68 4.2 -9 687.00 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 15 58 68 3.9 -9 687.10 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 15 59 67 4.2 -9 687.10 -56.4 -56.8 -56.4 63 -99 SPO 1997 10 06 16 00 67 3.8 -9 687.10 -56.4 -56.8 -56.4 63 0 SPO 1997 10 06 16 01 70 3.9 -9 687.10 -56.4 -56.8 -56.4 63 -99 SPO 1997 10 06 16 02 68 4.5 -9 687.10 -56.3 -56.7 -56.3 62 -99 SPO 1997 10 06 16 03 70 4.1 -9 687.10 -56.3 -56.7 -56.4 61 -99 SPO 1997 10 06 16 04 70 4.1 -9 687.10 -56.3 -56.8 -56.3 61 -99 SPO 1997 10 06 16 05 67 4.0 -9 687.10 -56.4 -56.7 -56.4 62 -99 SPO 1997 10 06 16 06 67 4.1 -9 687.10 -56.3 -56.7 -56.3 62 -99 SPO 1997 10 06 16 07 65 3.9 -9 687.20 -56.3 -56.7 -56.3 62 -99 SPO 1997 10 06 16 08 66 3.5 -9 687.20 -56.3 -56.6 -56.3 63 -99 SPO 1997 10 06 16 09 69 3.6 -9 687.20 -56.3 -56.6 -56.2 63 -99 SPO 1997 10 06 16 10 70 3.6 -9 687.20 -56.2 -56.6 -56.2 62 -99 SPO 1997 10 06 16 11 69 3.8 -9 687.30 -56.2 -56.6 -56.3 62 -99 SPO 1997 10 06 16 12 69 3.9 -9 687.30 -56.2 -56.5 -56.2 62 -99 SPO 1997 10 06 16 13 71 3.8 -9 687.30 -56.2 -56.6 -56.2 61 -99 SPO 1997 10 06 16 14 68 3.5 -9 687.30 -56.1 -56.6 -56.1 61 -99 SPO 1997 10 06 16 15 73 3.7 -9 687.40 -56.0 -56.5 -56.1 61 -99 SPO 1997 10 06 16 16 72 3.7 -9 687.40 -56.0 -56.5 -56.1 61 -99 SPO 1997 10 06 16 17 73 3.6 -9 687.50 -56.0 -56.5 -56.1 61 -99 SPO 1997 10 06 16 18 73 3.4 -9 687.50 -56.0 -56.5 -56.1 62 -99 SPO 1997 10 06 16 19 71 3.3 -9 687.50 -56.0 -56.4 -56.0 62 -99 SPO 1997 10 06 16 20 74 3.3 -9 687.50 -55.9 -56.4 -56.0 62 -99 SPO 1997 10 06 16 21 72 3.1 -9 687.50 -55.9 -56.3 -56.0 63 -99 SPO 1997 10 06 16 22 69 3.3 -9 687.50 -55.9 -56.3 -55.9 63 -99 SPO 1997 10 06 16 23 73 3.5 -9 687.50 -55.8 -56.2 -55.9 62 -99 SPO 1997 10 06 16 24 73 3.6 -9 687.50 -55.9 -56.2 -55.9 63 -99 SPO 1997 10 06 16 25 68 3.5 -9 687.50 -55.9 -56.2 -55.9 63 -99 SPO 1997 10 06 16 26 68 3.5 -9 687.50 -55.9 -56.2 -55.9 62 -99 SPO 1997 10 06 16 27 72 3.8 -9 687.50 -55.9 -56.2 -55.9 62 -99 SPO 1997 10 06 16 28 69 3.8 -9 687.40 -55.8 -56.3 -55.9 61 -99 SPO 1997 10 06 16 29 73 3.7 -9 687.40 -55.8 -56.3 -55.9 62 -99 SPO 1997 10 06 16 30 77 3.8 -9 687.40 -55.8 -56.3 -55.8 62 -99 SPO 1997 10 06 16 31 74 3.7 -9 687.40 -55.9 -56.3 -55.8 65 -99 SPO 1997 10 06 16 32 67 3.7 -9 687.40 -55.8 -56.2 -55.8 64 -99 SPO 1997 10 06 16 33 66 3.6 -9 687.40 -55.8 -56.2 -55.8 65 -99 SPO 1997 10 06 16 34 72 3.7 -9 687.40 -55.8 -56.2 -55.8 65 -99 SPO 1997 10 06 16 35 73 3.7 -9 687.40 -55.7 -56.2 -55.7 64 -99 SPO 1997 10 06 16 36 75 3.8 -9 687.40 -55.7 -56.2 -55.8 64 -99 SPO 1997 10 06 16 37 76 3.6 -9 687.40 -55.7 -56.1 -55.8 64 -99 SPO 1997 10 06 16 38 73 3.8 -9 687.40 -55.7 -56.1 -55.7 63 -99 SPO 1997 10 06 16 39 73 3.8 -9 687.50 -55.8 -56.1 -55.8 64 -99 SPO 1997 10 06 16 40 73 3.6 -9 687.50 -55.7 -56.1 -55.7 62 -99 SPO 1997 10 06 16 41 67 3.3 -9 687.50 -55.7 -56.0 -55.7 62 -99 SPO 1997 10 06 16 42 67 3.5 -9 687.50 -55.7 -56.0 -55.7 62 -99 SPO 1997 10 06 16 43 71 3.5 -9 687.50 -55.7 -56.0 -55.7 63 -99 SPO 1997 10 06 16 44 72 3.3 -9 687.50 -55.7 -56.1 -55.7 63 -99 SPO 1997 10 06 16 45 71 3.5 -9 687.50 -55.6 -56.1 -55.6 63 -99 SPO 1997 10 06 16 46 69 3.7 -9 687.50 -55.6 -56.1 -55.6 63 -99 SPO 1997 10 06 16 47 71 3.7 -9 687.50 -55.6 -56.1 -55.6 63 -99 SPO 1997 10 06 16 48 71 3.6 -9 687.50 -55.6 -56.0 -55.6 63 -99 SPO 1997 10 06 16 49 68 3.8 -9 687.50 -55.5 -56.0 -55.5 62 -99 SPO 1997 10 06 16 50 72 4.4 -9 687.50 -55.7 -56.0 -55.6 64 -99 SPO 1997 10 06 16 51 70 4.2 -9 687.50 -55.6 -56.1 -55.7 63 -99 SPO 1997 10 06 16 52 72 4.4 -9 687.50 -55.6 -56.0 -55.6 63 -99 SPO 1997 10 06 16 53 72 4.9 -9 687.50 -55.6 -55.9 -55.6 64 -99 SPO 1997 10 06 16 54 70 4.9 -9 687.50 -55.6 -55.9 -55.6 65 -99 SPO 1997 10 06 16 55 70 4.9 -9 687.50 -55.6 -56.0 -55.6 65 -99 SPO 1997 10 06 16 56 71 5.0 -9 687.50 -55.6 -56.0 -55.7 65 -99 SPO 1997 10 06 16 57 69 5.1 -9 687.60 -55.6 -55.9 -55.6 64 -99 SPO 1997 10 06 16 58 68 4.9 -9 687.60 -55.6 -56.0 -55.6 64 -99 SPO 1997 10 06 16 59 68 4.7 -9 687.60 -55.6 -56.0 -55.6 64 -99 SPO 1997 10 06 17 00 67 4.6 -9 687.60 -55.6 -56.0 -55.6 64 0 SPO 1997 10 06 17 01 66 4.5 -9 687.60 -55.6 -56.0 -55.6 64 -99 SPO 1997 10 06 17 02 64 4.3 -9 687.60 -55.6 -56.0 -55.6 64 -99 SPO 1997 10 06 17 03 66 4.2 -9 687.60 -55.6 -56.0 -55.6 63 -99 SPO 1997 10 06 17 04 65 3.8 -9 687.70 -55.6 -56.0 -55.6 62 -99 SPO 1997 10 06 17 05 65 3.7 -9 687.70 -55.6 -55.9 -55.6 63 -99 SPO 1997 10 06 17 06 67 3.6 -9 687.70 -55.6 -55.9 -55.6 63 -99 SPO 1997 10 06 17 07 68 3.6 -9 687.70 -55.6 -55.9 -55.6 63 -99 SPO 1997 10 06 17 08 69 3.8 -9 687.80 -55.5 -55.9 -55.6 62 -99 SPO 1997 10 06 17 09 65 3.6 -9 687.80 -55.6 -55.8 -55.6 63 -99 SPO 1997 10 06 17 10 67 3.7 -9 687.80 -55.6 -55.8 -55.6 63 -99 SPO 1997 10 06 17 11 68 4.1 -9 687.70 -55.6 -55.8 -55.6 63 -99 SPO 1997 10 06 17 12 67 3.8 -9 687.70 -55.6 -55.8 -55.6 62 -99 SPO 1997 10 06 17 13 63 3.9 -9 687.70 -55.5 -55.8 -55.6 62 -99 SPO 1997 10 06 17 14 66 4.0 -9 687.70 -55.5 -55.9 -55.6 62 -99 SPO 1997 10 06 17 15 67 4.1 -9 687.70 -55.5 -55.9 -55.6 62 -99 SPO 1997 10 06 17 16 69 3.5 -9 687.70 -55.6 -55.9 -55.6 62 -99 SPO 1997 10 06 17 17 72 3.8 -9 687.70 -55.6 -56.0 -55.6 62 -99 SPO 1997 10 06 17 18 76 3.7 -9 687.80 -55.7 -56.0 -55.6 63 -99 SPO 1997 10 06 17 19 75 4.0 -9 687.80 -55.7 -56.0 -55.6 63 -99 SPO 1997 10 06 17 20 77 4.1 -9 687.70 -55.8 -56.0 -55.7 64 -99 SPO 1997 10 06 17 21 75 4.2 -9 687.70 -55.8 -56.1 -55.8 64 -99 SPO 1997 10 06 17 22 75 4.3 -9 687.70 -55.8 -56.1 -55.8 64 -99 SPO 1997 10 06 17 23 76 4.4 -9 687.70 -55.9 -56.1 -55.8 64 -99 SPO 1997 10 06 17 24 74 3.9 -9 687.70 -55.9 -56.1 -55.9 63 -99 SPO 1997 10 06 17 25 74 4.0 -9 687.70 -55.9 -56.2 -55.9 63 -99 SPO 1997 10 06 17 26 73 4.0 -9 687.70 -56.0 -56.2 -55.9 63 -99 SPO 1997 10 06 17 27 72 3.9 -9 687.70 -56.0 -56.2 -56.0 62 -99 SPO 1997 10 06 17 28 74 3.7 -9 687.70 -56.0 -56.2 -56.0 61 -99 SPO 1997 10 06 17 29 77 3.6 -9 687.70 -56.1 -56.3 -56.0 62 -99 SPO 1997 10 06 17 30 75 3.5 -9 687.70 -56.1 -56.4 -56.0 61 -99 SPO 1997 10 06 17 31 73 4.0 -9 687.70 -56.1 -56.4 -56.1 61 -99 SPO 1997 10 06 17 32 74 4.0 -9 687.70 -56.2 -56.4 -56.1 62 -99 SPO 1997 10 06 17 33 82 3.6 -9 687.70 -56.2 -56.5 -56.1 62 -99 SPO 1997 10 06 17 34 83 3.6 -9 687.70 -56.4 -56.6 -56.2 63 -99 SPO 1997 10 06 17 35 84 3.7 -9 687.70 -56.5 -56.7 -56.3 63 -99 SPO 1997 10 06 17 36 81 3.8 -9 687.60 -56.6 -56.7 -56.4 63 -99 SPO 1997 10 06 17 37 78 4.4 -9 687.60 -56.6 -56.8 -56.4 62 -99 SPO 1997 10 06 17 38 76 4.4 -9 687.60 -56.7 -56.8 -56.5 62 -99 SPO 1997 10 06 17 39 74 4.2 -9 687.60 -56.7 -56.9 -56.6 61 -99 SPO 1997 10 06 17 40 76 4.2 -9 687.60 -56.8 -56.9 -56.6 62 -99 SPO 1997 10 06 17 41 75 4.3 -9 687.50 -56.8 -57.0 -56.6 62 -99 SPO 1997 10 06 17 42 73 4.4 -9 687.50 -56.9 -57.0 -56.7 63 -99 SPO 1997 10 06 17 43 73 4.7 -9 687.50 -56.9 -57.0 -56.8 62 -99 SPO 1997 10 06 17 44 75 4.7 -9 687.50 -57.0 -57.1 -56.8 63 -99 SPO 1997 10 06 17 45 75 4.5 -9 687.60 -57.0 -57.1 -56.8 63 -99 SPO 1997 10 06 17 46 76 4.4 -9 687.60 -57.0 -57.2 -56.8 63 -99 SPO 1997 10 06 17 47 78 4.2 -9 687.60 -57.1 -57.2 -56.8 63 -99 SPO 1997 10 06 17 48 80 4.1 -9 687.60 -57.1 -57.2 -56.8 62 -99 SPO 1997 10 06 17 49 81 4.1 -9 687.60 -57.2 -57.2 -56.9 62 -99 SPO 1997 10 06 17 50 82 4.3 -9 687.60 -57.2 -57.2 -56.8 62 -99 SPO 1997 10 06 17 51 84 4.1 -9 687.60 -57.2 -57.2 -56.8 61 -99 SPO 1997 10 06 17 52 82 4.0 -9 687.60 -57.2 -57.2 -56.8 61 -99 SPO 1997 10 06 17 53 82 4.1 -9 687.60 -57.2 -57.2 -56.8 61 -99 SPO 1997 10 06 17 54 82 3.9 -9 687.60 -57.2 -57.3 -56.8 61 -99 SPO 1997 10 06 17 55 81 3.9 -9 687.70 -57.3 -57.2 -56.8 62 -99 SPO 1997 10 06 17 56 81 4.0 -9 687.70 -57.3 -57.2 -56.8 62 -99 SPO 1997 10 06 17 57 80 4.0 -9 687.70 -57.3 -57.2 -56.8 62 -99 SPO 1997 10 06 17 58 80 4.0 -9 687.70 -57.3 -57.2 -56.9 61 -99 SPO 1997 10 06 17 59 79 4.3 -9 687.70 -57.3 -57.3 -56.9 61 -99 SPO 1997 10 06 18 00 79 4.3 -9 687.70 -57.3 -57.3 -56.9 61 0 SPO 1997 10 06 18 01 79 4.3 -9 687.70 -57.4 -57.3 -56.9 62 -99 SPO 1997 10 06 18 02 79 4.3 -9 687.70 -57.4 -57.3 -56.9 62 -99 SPO 1997 10 06 18 03 80 4.2 -9 687.70 -57.4 -57.3 -56.9 62 -99 SPO 1997 10 06 18 04 79 4.3 -9 687.70 -57.4 -57.4 -56.9 62 -99 SPO 1997 10 06 18 05 78 4.4 -9 687.70 -57.4 -57.3 -56.9 62 -99 SPO 1997 10 06 18 06 77 4.6 -9 687.70 -57.5 -57.3 -57.0 63 -99 SPO 1997 10 06 18 07 76 4.8 -9 687.70 -57.5 -57.3 -57.0 63 -99 SPO 1997 10 06 18 08 76 5.0 -9 687.60 -57.4 -57.2 -57.0 62 -99 SPO 1997 10 06 18 09 77 4.9 -9 687.60 -57.4 -57.2 -57.0 63 -99 SPO 1997 10 06 18 10 76 4.9 -9 687.60 -57.5 -57.2 -57.0 63 -99 SPO 1997 10 06 18 11 75 5.1 -9 687.60 -57.5 -57.2 -57.1 63 -99 SPO 1997 10 06 18 12 75 5.0 -9 687.60 -57.5 -57.2 -57.1 63 -99 SPO 1997 10 06 18 13 76 4.7 -9 687.70 -57.5 -57.1 -57.1 63 -99 SPO 1997 10 06 18 14 77 4.2 -9 687.70 -57.5 -57.2 -57.0 62 -99 SPO 1997 10 06 18 15 78 4.0 -9 687.80 -57.5 -57.2 -57.0 61 -99 SPO 1997 10 06 18 16 80 3.6 -9 687.80 -57.5 -57.3 -56.9 61 -99 SPO 1997 10 06 18 17 83 3.5 -9 687.80 -57.6 -57.3 -56.8 63 -99 SPO 1997 10 06 18 18 86 3.5 -9 687.90 -57.6 -57.4 -56.7 63 -99 SPO 1997 10 06 18 19 85 3.5 -9 687.80 -57.6 -57.4 -56.8 63 -99 SPO 1997 10 06 18 20 84 3.5 -9 687.80 -57.7 -57.4 -56.8 63 -99 SPO 1997 10 06 18 21 84 3.6 -9 687.80 -57.7 -57.4 -56.8 63 -99 SPO 1997 10 06 18 22 83 3.7 -9 687.80 -57.7 -57.4 -56.9 63 -99 SPO 1997 10 06 18 23 82 4.0 -9 687.80 -57.8 -57.5 -57.0 62 -99 SPO 1997 10 06 18 24 81 4.1 -9 687.70 -57.8 -57.5 -57.1 61 -99 SPO 1997 10 06 18 25 79 4.1 -9 687.70 -57.8 -57.5 -57.2 61 -99 SPO 1997 10 06 18 26 78 4.1 -9 687.80 -57.8 -57.5 -57.2 60 -99 SPO 1997 10 06 18 27 78 4.0 -9 687.80 -57.8 -57.5 -57.2 60 -99 SPO 1997 10 06 18 28 80 3.7 -9 687.80 -57.8 -57.5 -57.2 60 -99 SPO 1997 10 06 18 29 83 3.6 -9 687.80 -57.8 -57.6 -57.1 61 -99 SPO 1997 10 06 18 30 82 3.8 -9 687.80 -57.8 -57.6 -57.1 61 -99 SPO 1997 10 06 18 31 81 4.0 -9 687.80 -57.8 -57.6 -57.2 60 -99 SPO 1997 10 06 18 32 79 4.0 -9 687.70 -57.9 -57.7 -57.2 61 -99 SPO 1997 10 06 18 33 80 4.2 -9 687.70 -57.9 -57.7 -57.3 62 -99 SPO 1997 10 06 18 34 82 4.5 -9 687.70 -58.0 -57.8 -57.3 62 -99 SPO 1997 10 06 18 35 82 4.6 -9 687.70 -58.0 -57.8 -57.4 62 -99 SPO 1997 10 06 18 36 79 4.9 -9 687.60 -58.0 -57.8 -57.5 62 -99 SPO 1997 10 06 18 37 78 5.0 -9 687.60 -58.1 -57.9 -57.6 62 -99 SPO 1997 10 06 18 38 77 5.1 -9 687.70 -58.1 -57.9 -57.7 62 -99 SPO 1997 10 06 18 39 80 4.9 -9 687.70 -58.1 -57.9 -57.7 62 -99 SPO 1997 10 06 18 40 80 4.7 -9 687.70 -58.2 -58.0 -57.7 62 -99 SPO 1997 10 06 18 41 79 4.5 -9 687.70 -58.2 -58.0 -57.8 62 -99 SPO 1997 10 06 18 42 79 4.5 -9 687.70 -58.3 -58.0 -57.8 63 -99 SPO 1997 10 06 18 43 81 4.4 -9 687.70 -58.3 -58.0 -57.8 64 -99 SPO 1997 10 06 18 44 81 4.6 -9 687.80 -58.3 -58.1 -57.8 63 -99 SPO 1997 10 06 18 45 81 4.5 -9 687.80 -58.3 -58.1 -57.8 63 -99 SPO 1997 10 06 18 46 80 4.6 -9 687.80 -58.3 -58.1 -57.8 62 -99 SPO 1997 10 06 18 47 83 4.4 -9 687.80 -58.3 -58.1 -57.8 62 -99 SPO 1997 10 06 18 48 85 4.5 -9 687.80 -58.3 -58.1 -57.7 62 -99 SPO 1997 10 06 18 49 86 4.3 -9 687.80 -58.3 -58.2 -57.7 62 -99 SPO 1997 10 06 18 50 85 4.4 -9 687.80 -58.3 -58.2 -57.7 61 -99 SPO 1997 10 06 18 51 86 4.4 -9 687.90 -58.3 -58.2 -57.7 62 -99 SPO 1997 10 06 18 52 87 4.3 -9 687.90 -58.4 -58.2 -57.7 62 -99 SPO 1997 10 06 18 53 87 4.6 -9 687.90 -58.4 -58.2 -57.7 63 -99 SPO 1997 10 06 18 54 85 4.7 -9 687.90 -58.4 -58.2 -57.8 63 -99 SPO 1997 10 06 18 55 84 4.9 -9 687.90 -58.4 -58.2 -57.8 63 -99 SPO 1997 10 06 18 56 82 4.9 -9 687.80 -58.4 -58.2 -57.9 63 -99 SPO 1997 10 06 18 57 80 5.2 -9 687.80 -58.4 -58.2 -57.9 63 -99 SPO 1997 10 06 18 58 79 5.5 -9 687.80 -58.4 -58.1 -58.0 62 -99 SPO 1997 10 06 18 59 78 5.8 -9 687.70 -58.4 -58.1 -58.0 62 -99 SPO 1997 10 06 19 00 76 5.9 -9 687.70 -58.4 -58.1 -58.0 62 0 SPO 1997 10 06 19 01 75 6.1 -9 687.70 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 02 76 6.3 -9 687.70 -58.4 -58.0 -58.0 62 -99 SPO 1997 10 06 19 03 76 6.3 -9 687.70 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 04 76 6.4 -9 687.80 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 05 76 6.4 -9 687.80 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 06 76 6.4 -9 687.80 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 07 75 6.2 -9 687.80 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 19 08 76 6.3 -9 687.80 -58.5 -58.0 -58.1 62 -99 SPO 1997 10 06 19 09 77 6.0 -9 687.80 -58.4 -58.0 -58.1 61 -99 SPO 1997 10 06 19 10 77 6.0 -9 687.80 -58.5 -58.1 -58.1 62 -99 SPO 1997 10 06 19 11 76 6.0 -9 687.80 -58.5 -58.0 -58.1 62 -99 SPO 1997 10 06 19 12 75 6.0 -9 687.80 -58.5 -58.0 -58.1 62 -99 SPO 1997 10 06 19 13 74 6.1 -9 687.80 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 19 14 76 6.0 -9 687.80 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 19 15 75 6.0 -9 687.80 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 19 16 76 6.1 -9 687.80 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 19 17 76 6.1 -9 687.90 -58.5 -58.1 -58.2 63 -99 SPO 1997 10 06 19 18 76 6.3 -9 687.90 -58.5 -58.1 -58.2 63 -99 SPO 1997 10 06 19 19 77 6.3 -9 687.90 -58.5 -58.1 -58.2 62 -99 SPO 1997 10 06 19 20 78 6.4 -9 687.80 -58.5 -58.1 -58.2 62 -99 SPO 1997 10 06 19 21 78 6.5 -9 687.80 -58.5 -58.1 -58.2 62 -99 SPO 1997 10 06 19 22 77 6.5 -9 687.80 -58.5 -58.0 -58.2 61 -99 SPO 1997 10 06 19 23 76 6.5 -9 687.90 -58.6 -58.0 -58.2 61 -99 SPO 1997 10 06 19 24 76 6.5 -9 687.90 -58.6 -58.0 -58.3 61 -99 SPO 1997 10 06 19 25 77 6.8 -9 687.90 -58.6 -58.0 -58.3 61 -99 SPO 1997 10 06 19 26 77 7.0 -9 687.90 -58.6 -57.9 -58.3 62 -99 SPO 1997 10 06 19 27 78 7.0 -9 687.90 -58.6 -57.8 -58.3 62 -99 SPO 1997 10 06 19 28 78 7.3 -9 687.80 -58.6 -57.8 -58.3 62 -99 SPO 1997 10 06 19 29 78 7.4 -9 687.80 -58.6 -57.7 -58.3 62 -99 SPO 1997 10 06 19 30 78 7.5 -9 687.70 -58.6 -57.6 -58.3 62 -99 SPO 1997 10 06 19 31 78 7.6 -9 687.70 -58.6 -57.5 -58.3 62 -99 SPO 1997 10 06 19 32 78 7.6 -9 687.70 -58.6 -57.4 -58.3 61 -99 SPO 1997 10 06 19 33 78 7.5 -9 687.70 -58.6 -57.4 -58.3 61 -99 SPO 1997 10 06 19 34 78 7.5 -9 687.70 -58.5 -57.3 -58.3 59 -99 SPO 1997 10 06 19 35 79 7.3 -9 687.80 -58.5 -57.4 -58.2 59 -99 SPO 1997 10 06 19 36 79 7.4 -9 687.80 -58.5 -57.4 -58.2 59 -99 SPO 1997 10 06 19 37 78 7.5 -9 687.80 -58.5 -57.3 -58.2 60 -99 SPO 1997 10 06 19 38 78 7.6 -9 687.70 -58.5 -57.2 -58.2 61 -99 SPO 1997 10 06 19 39 77 7.7 -9 687.70 -58.4 -57.1 -58.2 61 -99 SPO 1997 10 06 19 40 76 7.7 -9 687.70 -58.4 -57.2 -58.2 61 -99 SPO 1997 10 06 19 41 76 7.7 -9 687.70 -58.4 -57.2 -58.2 62 -99 SPO 1997 10 06 19 42 77 7.8 -9 687.70 -58.4 -57.2 -58.1 62 -99 SPO 1997 10 06 19 43 77 7.6 -9 687.70 -58.4 -57.2 -58.1 62 -99 SPO 1997 10 06 19 44 77 7.5 -9 687.70 -58.3 -57.2 -58.1 62 -99 SPO 1997 10 06 19 45 78 6.9 -9 687.80 -58.3 -57.3 -58.0 62 -99 SPO 1997 10 06 19 46 80 6.9 -9 687.80 -58.3 -57.4 -58.0 62 -99 SPO 1997 10 06 19 47 82 6.6 -9 687.90 -58.2 -57.4 -57.9 61 -99 SPO 1997 10 06 19 48 84 6.5 -9 687.90 -58.2 -57.4 -57.8 60 -99 SPO 1997 10 06 19 49 83 6.5 -9 687.90 -58.2 -57.4 -57.8 61 -99 SPO 1997 10 06 19 50 85 6.3 -9 687.90 -58.2 -57.4 -57.8 61 -99 SPO 1997 10 06 19 51 85 6.3 -9 688.00 -58.1 -57.5 -57.7 61 -99 SPO 1997 10 06 19 52 85 6.3 -9 688.00 -58.1 -57.5 -57.7 61 -99 SPO 1997 10 06 19 53 86 6.2 -9 688.00 -58.1 -57.5 -57.7 62 -99 SPO 1997 10 06 19 54 87 6.3 -9 688.00 -58.0 -57.5 -57.6 62 -99 SPO 1997 10 06 19 55 86 6.2 -9 688.00 -58.0 -57.5 -57.6 62 -99 SPO 1997 10 06 19 56 86 6.5 -9 688.00 -58.0 -57.4 -57.6 62 -99 SPO 1997 10 06 19 57 84 6.6 -9 687.90 -57.9 -57.4 -57.5 61 -99 SPO 1997 10 06 19 58 84 6.7 -9 687.90 -57.8 -57.4 -57.5 61 -99 SPO 1997 10 06 19 59 83 6.8 -9 687.90 -57.8 -57.3 -57.4 61 -99 SPO 1997 10 06 20 00 83 6.7 -9 687.90 -57.7 -57.3 -57.3 61 0 SPO 1997 10 06 20 01 83 6.7 -9 687.90 -57.6 -57.2 -57.3 62 -99 SPO 1997 10 06 20 02 83 6.6 -9 687.90 -57.6 -57.2 -57.3 63 -99 SPO 1997 10 06 20 03 83 6.5 -9 687.90 -57.5 -57.1 -57.2 63 -99 SPO 1997 10 06 20 04 83 6.5 -9 688.00 -57.5 -57.0 -57.2 63 -99 SPO 1997 10 06 20 05 83 6.5 -9 688.00 -57.4 -57.0 -57.1 63 -99 SPO 1997 10 06 20 06 84 6.3 -9 688.00 -57.4 -57.0 -57.1 63 -99 SPO 1997 10 06 20 07 83 6.5 -9 688.00 -57.4 -57.0 -57.1 63 -99 SPO 1997 10 06 20 08 82 6.5 -9 687.90 -57.4 -56.9 -57.1 63 -99 SPO 1997 10 06 20 09 83 6.5 -9 687.90 -57.4 -56.9 -57.0 64 -99 SPO 1997 10 06 20 10 83 6.5 -9 687.90 -57.3 -56.9 -57.0 63 -99 SPO 1997 10 06 20 11 83 6.6 -9 687.90 -57.3 -56.9 -57.0 64 -99 SPO 1997 10 06 20 12 84 6.6 -9 687.90 -57.3 -56.9 -57.0 64 -99 SPO 1997 10 06 20 13 83 6.8 -9 687.90 -57.3 -56.8 -57.0 64 -99 SPO 1997 10 06 20 14 84 6.7 -9 687.90 -57.3 -56.8 -57.0 64 -99 SPO 1997 10 06 20 15 83 6.9 -9 687.90 -57.3 -56.8 -57.0 65 -99 SPO 1997 10 06 20 16 83 6.9 -9 687.90 -57.3 -56.7 -57.0 66 -99 SPO 1997 10 06 20 17 83 7.0 -9 687.90 -57.3 -56.7 -57.0 66 -99 SPO 1997 10 06 20 18 83 7.0 -9 687.90 -57.3 -56.7 -57.0 66 -99 SPO 1997 10 06 20 19 84 7.0 -9 687.90 -57.2 -56.6 -57.0 65 -99 SPO 1997 10 06 20 20 85 6.8 -9 687.90 -57.2 -56.7 -56.9 64 -99 SPO 1997 10 06 20 21 85 6.8 -9 688.00 -57.2 -56.6 -56.9 63 -99 SPO 1997 10 06 20 22 86 6.7 -9 688.00 -57.1 -56.6 -56.9 63 -99 SPO 1997 10 06 20 23 85 6.5 -9 688.00 -57.1 -56.7 -56.9 63 -99 SPO 1997 10 06 20 24 85 6.6 -9 688.00 -57.0 -56.7 -56.9 63 -99 SPO 1997 10 06 20 25 85 6.6 -9 688.00 -57.0 -56.7 -56.9 64 -99 SPO 1997 10 06 20 26 86 6.8 -9 688.00 -57.0 -56.7 -56.9 64 -99 SPO 1997 10 06 20 27 87 6.7 -9 688.00 -57.0 -56.7 -56.9 65 -99 SPO 1997 10 06 20 28 87 6.7 -9 688.00 -57.0 -56.7 -56.9 65 -99 SPO 1997 10 06 20 29 86 6.6 -9 688.10 -57.0 -56.6 -56.9 65 -99 SPO 1997 10 06 20 30 87 6.6 -9 688.10 -57.0 -56.6 -56.8 64 -99 SPO 1997 10 06 20 31 88 6.6 -9 688.10 -57.0 -56.6 -56.8 63 -99 SPO 1997 10 06 20 32 88 6.7 -9 688.10 -57.0 -56.6 -56.8 63 -99 SPO 1997 10 06 20 33 88 6.7 -9 688.10 -56.9 -56.5 -56.8 62 -99 SPO 1997 10 06 20 34 89 6.6 -9 688.10 -56.9 -56.5 -56.8 62 -99 SPO 1997 10 06 20 35 91 6.5 -9 688.20 -56.9 -56.5 -56.8 61 -99 SPO 1997 10 06 20 36 92 6.2 -9 688.20 -56.8 -56.4 -56.7 61 -99 SPO 1997 10 06 20 37 93 6.0 -9 688.20 -56.8 -56.4 -56.7 61 -99 SPO 1997 10 06 20 38 92 5.9 -9 688.20 -56.7 -56.4 -56.6 61 -99 SPO 1997 10 06 20 39 91 5.9 -9 688.20 -56.6 -56.4 -56.6 61 -99 SPO 1997 10 06 20 40 90 5.8 -9 688.20 -56.5 -56.4 -56.5 61 -99 SPO 1997 10 06 20 41 90 5.7 -9 688.30 -56.4 -56.4 -56.4 61 -99 SPO 1997 10 06 20 42 90 5.5 -9 688.30 -56.3 -56.3 -56.3 61 -99 SPO 1997 10 06 20 43 88 5.6 -9 688.30 -56.3 -56.3 -56.3 61 -99 SPO 1997 10 06 20 44 89 5.6 -9 688.20 -56.2 -56.3 -56.2 61 -99 SPO 1997 10 06 20 45 88 5.9 -9 688.20 -56.2 -56.3 -56.2 61 -99 SPO 1997 10 06 20 46 89 6.0 -9 688.20 -56.1 -56.3 -56.2 61 -99 SPO 1997 10 06 20 47 89 6.0 -9 688.20 -56.1 -56.3 -56.1 61 -99 SPO 1997 10 06 20 48 88 6.5 -9 688.20 -56.1 -56.2 -56.1 63 -99 SPO 1997 10 06 20 49 89 6.4 -9 688.10 -56.0 -56.2 -56.0 63 -99 SPO 1997 10 06 20 50 88 6.4 -9 688.10 -55.9 -56.2 -56.0 63 -99 SPO 1997 10 06 20 51 86 6.7 -9 688.10 -55.9 -56.1 -55.9 64 -99 SPO 1997 10 06 20 52 85 6.6 -9 688.10 -55.8 -56.1 -55.9 63 -99 SPO 1997 10 06 20 53 83 6.6 -9 688.10 -55.8 -56.1 -55.9 63 -99 SPO 1997 10 06 20 54 82 6.5 -9 688.10 -55.8 -56.2 -55.9 63 -99 SPO 1997 10 06 20 55 82 6.5 -9 688.10 -55.8 -56.2 -55.9 63 -99 SPO 1997 10 06 20 56 82 6.7 -9 688.10 -55.8 -56.2 -55.9 63 -99 SPO 1997 10 06 20 57 82 6.5 -9 688.20 -55.8 -56.2 -55.9 63 -99 SPO 1997 10 06 20 58 82 6.6 -9 688.20 -55.9 -56.2 -55.9 64 -99 SPO 1997 10 06 20 59 82 6.6 -9 688.20 -55.9 -56.2 -55.9 65 -99 SPO 1997 10 06 21 00 80 6.0 -9 688.20 -55.8 -56.2 -55.9 64 0 SPO 1997 10 06 21 01 83 5.8 -9 688.30 -55.9 -56.3 -56.0 65 -99 SPO 1997 10 06 21 02 83 5.9 -9 688.30 -56.0 -56.3 -56.0 66 -99 SPO 1997 10 06 21 03 82 5.4 -9 688.40 -56.1 -56.4 -56.0 66 -99 SPO 1997 10 06 21 04 82 5.2 -9 688.40 -56.1 -56.4 -56.1 66 -99 SPO 1997 10 06 21 05 83 5.2 -9 688.50 -56.1 -56.4 -56.1 66 -99 SPO 1997 10 06 21 06 83 5.2 -9 688.50 -56.1 -56.4 -56.1 64 -99 SPO 1997 10 06 21 07 82 4.9 -9 688.50 -56.1 -56.4 -56.1 64 -99 SPO 1997 10 06 21 08 83 5.3 -9 688.50 -56.2 -56.5 -56.2 64 -99 SPO 1997 10 06 21 09 81 5.5 -9 688.50 -56.3 -56.6 -56.2 64 -99 SPO 1997 10 06 21 10 79 5.2 -9 688.50 -56.4 -56.8 -56.3 65 -99 SPO 1997 10 06 21 11 80 5.4 -9 688.50 -56.4 -56.8 -56.4 65 -99 SPO 1997 10 06 21 12 78 5.2 -9 688.50 -56.5 -56.9 -56.5 65 -99 SPO 1997 10 06 21 13 78 4.8 -9 688.50 -56.6 -57.0 -56.6 65 -99 SPO 1997 10 06 21 14 77 5.2 -9 688.50 -56.8 -57.1 -56.7 67 -99 SPO 1997 10 06 21 15 76 5.4 -9 688.50 -56.9 -57.2 -56.8 66 -99 SPO 1997 10 06 21 16 78 5.4 -9 688.50 -57.0 -57.2 -56.9 67 -99 SPO 1997 10 06 21 17 78 5.4 -9 688.50 -57.1 -57.4 -57.0 66 -99 SPO 1997 10 06 21 18 78 5.5 -9 688.60 -57.2 -57.4 -57.0 65 -99 SPO 1997 10 06 21 19 80 5.1 -9 688.60 -57.2 -57.4 -57.2 63 -99 SPO 1997 10 06 21 20 84 4.5 -9 688.60 -57.4 -57.6 -57.2 63 -99 SPO 1997 10 06 21 21 87 4.5 -9 688.60 -57.5 -57.6 -57.3 63 -99 SPO 1997 10 06 21 22 90 4.4 -9 688.60 -57.6 -57.7 -57.4 62 -99 SPO 1997 10 06 21 23 95 4.1 -9 688.70 -57.7 -57.8 -57.5 61 -99 SPO 1997 10 06 21 24 97 4.1 -9 688.70 -57.8 -58.0 -57.6 61 -99 SPO 1997 10 06 21 25 95 4.2 -9 688.70 -57.8 -58.0 -57.6 60 -99 SPO 1997 10 06 21 26 97 4.1 -9 688.70 -57.9 -58.1 -57.6 60 -99 SPO 1997 10 06 21 27 100 4.1 -9 688.70 -57.9 -58.1 -57.7 60 -99 SPO 1997 10 06 21 28 99 4.3 -9 688.70 -58.0 -58.1 -57.7 59 -99 SPO 1997 10 06 21 29 98 4.5 -9 688.70 -58.0 -58.1 -57.8 59 -99 SPO 1997 10 06 21 30 98 4.6 -9 688.70 -58.0 -58.1 -57.8 58 -99 SPO 1997 10 06 21 31 98 4.7 -9 688.70 -58.0 -58.1 -57.9 58 -99 SPO 1997 10 06 21 32 99 4.7 -9 688.70 -58.1 -58.1 -57.9 59 -99 SPO 1997 10 06 21 33 97 4.7 -9 688.70 -58.1 -58.1 -57.9 58 -99 SPO 1997 10 06 21 34 96 4.9 -9 688.80 -58.1 -58.1 -57.9 58 -99 SPO 1997 10 06 21 35 97 4.9 -9 688.80 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 36 97 5.0 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 37 98 4.9 -9 688.70 -58.2 -58.0 -58.0 59 -99 SPO 1997 10 06 21 38 99 4.8 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 39 97 4.8 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 40 95 4.9 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 41 93 5.1 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 42 93 5.1 -9 688.70 -58.2 -58.1 -58.0 59 -99 SPO 1997 10 06 21 43 93 5.3 -9 688.70 -58.2 -58.0 -58.0 59 -99 SPO 1997 10 06 21 44 92 5.2 -9 688.70 -58.2 -58.0 -58.0 59 -99 SPO 1997 10 06 21 45 92 5.1 -9 688.70 -58.2 -58.0 -58.0 59 -99 SPO 1997 10 06 21 46 93 5.0 -9 688.70 -58.2 -57.9 -58.0 60 -99 SPO 1997 10 06 21 47 93 4.8 -9 688.70 -58.2 -57.9 -57.9 61 -99 SPO 1997 10 06 21 48 95 4.8 -9 688.70 -58.2 -57.8 -57.9 61 -99 SPO 1997 10 06 21 49 97 4.8 -9 688.70 -58.2 -57.8 -57.9 61 -99 SPO 1997 10 06 21 50 96 4.6 -9 688.70 -58.2 -57.8 -57.9 62 -99 SPO 1997 10 06 21 51 95 4.7 -9 688.70 -58.2 -57.8 -58.0 62 -99 SPO 1997 10 06 21 52 96 4.2 -9 688.70 -58.2 -57.8 -58.0 61 -99 SPO 1997 10 06 21 53 95 4.2 -9 688.70 -58.1 -58.0 -58.0 60 -99 SPO 1997 10 06 21 54 96 4.0 -9 688.70 -58.2 -58.0 -58.0 61 -99 SPO 1997 10 06 21 55 94 4.1 -9 688.70 -58.3 -58.0 -58.1 62 -99 SPO 1997 10 06 21 56 93 4.2 -9 688.70 -58.3 -58.1 -58.1 61 -99 SPO 1997 10 06 21 57 91 4.4 -9 688.60 -58.4 -58.0 -58.1 62 -99 SPO 1997 10 06 21 58 91 4.3 -9 688.60 -58.4 -58.0 -58.2 62 -99 SPO 1997 10 06 21 59 92 4.5 -9 688.60 -58.4 -58.0 -58.2 62 -99 SPO 1997 10 06 22 00 94 4.3 -9 688.60 -58.4 -58.0 -58.2 62 0 SPO 1997 10 06 22 01 95 4.0 -9 688.70 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 22 02 94 4.0 -9 688.70 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 22 03 93 4.4 -9 688.70 -58.5 -58.0 -58.2 62 -99 SPO 1997 10 06 22 04 94 4.5 -9 688.70 -58.4 -57.9 -58.2 60 -99 SPO 1997 10 06 22 05 95 4.8 -9 688.70 -58.4 -58.0 -58.2 59 -99 SPO 1997 10 06 22 06 94 5.0 -9 688.70 -58.4 -58.0 -58.2 59 -99 SPO 1997 10 06 22 07 93 5.1 -9 688.70 -58.4 -57.9 -58.3 59 -99 SPO 1997 10 06 22 08 93 5.1 -9 688.70 -58.5 -57.9 -58.4 59 -99 SPO 1997 10 06 22 09 94 5.3 -9 688.70 -58.5 -58.0 -58.4 59 -99 SPO 1997 10 06 22 10 95 5.0 -9 688.70 -58.6 -58.0 -58.4 61 -99 SPO 1997 10 06 22 11 95 5.0 -9 688.70 -58.6 -58.0 -58.5 61 -99 SPO 1997 10 06 22 12 93 5.5 -9 688.70 -58.7 -57.9 -58.5 61 -99 SPO 1997 10 06 22 13 93 5.4 -9 688.70 -58.6 -57.8 -58.5 61 -99 SPO 1997 10 06 22 14 94 5.1 -9 688.70 -58.7 -57.9 -58.5 61 -99 SPO 1997 10 06 22 15 94 5.4 -9 688.70 -58.7 -57.8 -58.6 61 -99 SPO 1997 10 06 22 16 94 5.4 -9 688.70 -58.7 -57.9 -58.6 60 -99 SPO 1997 10 06 22 17 95 5.5 -9 688.80 -58.7 -58.0 -58.6 60 -99 SPO 1997 10 06 22 18 95 5.3 -9 688.80 -58.8 -58.0 -58.7 60 -99 SPO 1997 10 06 22 19 94 5.5 -9 688.80 -58.8 -57.9 -58.7 60 -99 SPO 1997 10 06 22 20 94 5.9 -9 688.70 -58.8 -57.8 -58.7 60 -99 SPO 1997 10 06 22 21 93 6.0 -9 688.70 -58.8 -57.8 -58.7 61 -99 SPO 1997 10 06 22 22 92 6.3 -9 688.70 -58.8 -57.8 -58.8 61 -99 SPO 1997 10 06 22 23 92 6.3 -9 688.60 -58.9 -57.7 -58.8 61 -99 SPO 1997 10 06 22 24 90 6.2 -9 688.60 -58.9 -57.7 -58.8 61 -99 SPO 1997 10 06 22 25 91 6.4 -9 688.60 -58.9 -57.8 -58.8 61 -99 SPO 1997 10 06 22 26 93 6.5 -9 688.60 -58.9 -57.6 -58.8 61 -99 SPO 1997 10 06 22 27 94 6.3 -9 688.60 -58.9 -57.6 -58.8 61 -99 SPO 1997 10 06 22 28 95 5.9 -9 688.60 -59.0 -57.8 -58.9 61 -99 SPO 1997 10 06 22 29 95 5.6 -9 688.70 -59.0 -58.0 -58.9 61 -99 SPO 1997 10 06 22 30 96 5.6 -9 688.70 -59.0 -57.9 -58.9 60 -99 SPO 1997 10 06 22 31 95 5.4 -9 688.70 -59.0 -57.9 -58.9 60 -99 SPO 1997 10 06 22 32 95 5.4 -9 688.70 -59.0 -57.9 -58.9 60 -99 SPO 1997 10 06 22 33 97 5.5 -9 688.80 -58.8 -57.8 -58.8 58 -99 SPO 1997 10 06 22 34 98 5.5 -9 688.70 -58.9 -57.8 -58.8 60 -99 SPO 1997 10 06 22 35 99 5.7 -9 688.70 -58.9 -57.8 -58.9 61 -99 SPO 1997 10 06 22 36 98 5.8 -9 688.70 -59.0 -57.8 -58.9 61 -99 SPO 1997 10 06 22 37 97 5.7 -9 688.70 -58.9 -57.9 -58.9 60 -99 SPO 1997 10 06 22 38 99 5.6 -9 688.70 -59.0 -58.0 -58.9 61 -99 SPO 1997 10 06 22 39 99 5.7 -9 688.70 -59.0 -58.0 -59.0 61 -99 SPO 1997 10 06 22 40 99 5.7 -9 688.70 -59.0 -58.1 -59.0 60 -99 SPO 1997 10 06 22 41 99 5.6 -9 688.80 -59.1 -58.2 -59.0 61 -99 SPO 1997 10 06 22 42 98 5.5 -9 688.70 -59.1 -58.3 -59.0 60 -99 SPO 1997 10 06 22 43 97 5.7 -9 688.80 -59.0 -58.4 -59.0 59 -99 SPO 1997 10 06 22 44 96 5.5 -9 688.80 -59.1 -58.4 -59.0 60 -99 SPO 1997 10 06 22 45 94 5.4 -9 688.80 -59.2 -58.5 -59.1 61 -99 SPO 1997 10 06 22 46 92 5.4 -9 688.80 -59.2 -58.4 -59.1 61 -99 SPO 1997 10 06 22 47 91 5.4 -9 688.80 -59.2 -58.4 -59.2 61 -99 SPO 1997 10 06 22 48 90 5.7 -9 688.80 -59.3 -58.4 -59.2 61 -99 SPO 1997 10 06 22 49 90 5.7 -9 688.80 -59.3 -58.4 -59.2 61 -99 SPO 1997 10 06 22 50 89 5.8 -9 688.80 -59.3 -58.5 -59.2 60 -99 SPO 1997 10 06 22 51 88 6.0 -9 688.80 -59.3 -58.5 -59.3 59 -99 SPO 1997 10 06 22 52 88 6.0 -9 688.80 -59.3 -58.4 -59.3 59 -99 SPO 1997 10 06 22 53 89 6.0 -9 688.80 -59.3 -58.5 -59.2 58 -99 SPO 1997 10 06 22 54 89 5.7 -9 688.80 -59.3 -58.6 -59.2 58 -99 SPO 1997 10 06 22 55 90 5.5 -9 688.90 -59.3 -58.6 -59.3 59 -99 SPO 1997 10 06 22 56 91 5.2 -9 688.90 -59.4 -58.7 -59.3 60 -99 SPO 1997 10 06 22 57 91 4.9 -9 688.90 -59.4 -58.9 -59.3 60 -99 SPO 1997 10 06 22 58 92 4.8 -9 688.90 -59.4 -58.9 -59.4 60 -99 SPO 1997 10 06 22 59 91 4.9 -9 688.90 -59.5 -58.9 -59.4 61 -99 SPO 1997 10 06 23 00 91 5.1 -9 688.90 -59.5 -58.9 -59.4 61 0 SPO 1997 10 06 23 01 91 5.2 -9 688.90 -59.5 -59.0 -59.4 61 -99 SPO 1997 10 06 23 02 89 5.2 -9 688.90 -59.6 -59.0 -59.5 60 -99 SPO 1997 10 06 23 03 90 5.2 -9 688.80 -59.6 -58.9 -59.5 60 -99 SPO 1997 10 06 23 04 90 5.0 -9 688.80 -59.6 -58.9 -59.5 59 -99 SPO 1997 10 06 23 05 90 5.2 -9 688.80 -59.6 -58.9 -59.5 59 -99 SPO 1997 10 06 23 06 90 5.3 -9 688.80 -59.5 -58.9 -59.5 58 -99 SPO 1997 10 06 23 07 89 5.2 -9 688.80 -59.5 -58.9 -59.4 59 -99 SPO 1997 10 06 23 08 87 5.4 -9 688.80 -59.5 -58.9 -59.4 60 -99 SPO 1997 10 06 23 09 86 5.4 -9 688.80 -59.5 -58.9 -59.4 60 -99 SPO 1997 10 06 23 10 85 5.5 -9 688.80 -59.5 -58.8 -59.4 61 -99 SPO 1997 10 06 23 11 87 5.4 -9 688.90 -59.5 -58.8 -59.5 61 -99 SPO 1997 10 06 23 12 86 5.2 -9 688.90 -59.5 -58.8 -59.5 61 -99 SPO 1997 10 06 23 13 87 5.3 -9 688.90 -59.5 -58.8 -59.4 61 -99 SPO 1997 10 06 23 14 87 5.3 -9 688.90 -59.5 -58.8 -59.5 60 -99 SPO 1997 10 06 23 15 86 5.2 -9 688.90 -59.4 -58.8 -59.4 59 -99 SPO 1997 10 06 23 16 85 5.6 -9 688.90 -59.5 -58.7 -59.4 60 -99 SPO 1997 10 06 23 17 86 5.9 -9 688.90 -59.5 -58.6 -59.5 60 -99 SPO 1997 10 06 23 18 85 6.1 -9 688.90 -59.5 -58.6 -59.5 60 -99 SPO 1997 10 06 23 19 86 6.3 -9 688.90 -59.5 -58.5 -59.5 60 -99 SPO 1997 10 06 23 20 86 6.4 -9 688.90 -59.5 -58.4 -59.5 61 -99 SPO 1997 10 06 23 21 87 6.5 -9 688.90 -59.5 -58.3 -59.5 61 -99 SPO 1997 10 06 23 22 87 6.6 -9 688.90 -59.6 -58.3 -59.5 61 -99 SPO 1997 10 06 23 23 88 6.7 -9 688.90 -59.6 -58.3 -59.5 61 -99 SPO 1997 10 06 23 24 88 6.8 -9 688.90 -59.6 -58.2 -59.6 61 -99 SPO 1997 10 06 23 25 89 7.0 -9 688.90 -59.6 -58.2 -59.6 60 -99 SPO 1997 10 06 23 26 89 7.2 -9 688.90 -59.6 -58.2 -59.5 60 -99 SPO 1997 10 06 23 27 89 7.5 -9 688.80 -59.6 -58.1 -59.6 60 -99 SPO 1997 10 06 23 28 88 7.5 -9 688.80 -59.6 -58.2 -59.6 59 -99 SPO 1997 10 06 23 29 87 7.6 -9 688.80 -59.6 -58.2 -59.6 60 -99 SPO 1997 10 06 23 30 86 7.6 -9 688.80 -59.7 -58.2 -59.6 60 -99 SPO 1997 10 06 23 31 86 7.5 -9 688.80 -59.6 -58.2 -59.6 60 -99 SPO 1997 10 06 23 32 85 7.5 -9 688.80 -59.7 -58.0 -59.7 60 -99 SPO 1997 10 06 23 33 85 7.5 -9 688.80 -59.7 -58.0 -59.7 61 -99 SPO 1997 10 06 23 34 85 7.5 -9 688.80 -59.7 -58.0 -59.7 61 -99 SPO 1997 10 06 23 35 85 7.4 -9 688.80 -59.7 -58.0 -59.7 60 -99 SPO 1997 10 06 23 36 85 7.3 -9 688.80 -59.7 -57.9 -59.7 60 -99 SPO 1997 10 06 23 37 86 7.1 -9 688.80 -59.7 -57.9 -59.7 60 -99 SPO 1997 10 06 23 38 87 6.9 -9 688.80 -59.7 -58.0 -59.7 60 -99 SPO 1997 10 06 23 39 88 6.7 -9 688.80 -59.7 -58.1 -59.7 60 -99 SPO 1997 10 06 23 40 87 6.6 -9 688.80 -59.7 -58.2 -59.6 60 -99 SPO 1997 10 06 23 41 87 6.6 -9 688.80 -59.7 -58.1 -59.6 60 -99 SPO 1997 10 06 23 42 86 6.6 -9 688.80 -59.7 -58.1 -59.7 61 -99 SPO 1997 10 06 23 43 86 6.6 -9 688.80 -59.7 -58.2 -59.7 61 -99 SPO 1997 10 06 23 44 86 6.5 -9 688.80 -59.7 -58.3 -59.7 62 -99 SPO 1997 10 06 23 45 86 6.2 -9 688.90 -59.7 -58.4 -59.7 62 -99 SPO 1997 10 06 23 46 85 6.0 -9 688.90 -59.7 -58.5 -59.7 61 -99 SPO 1997 10 06 23 47 84 5.9 -9 688.90 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 48 83 5.7 -9 689.00 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 49 82 5.5 -9 688.90 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 50 81 5.5 -9 688.90 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 51 81 5.5 -9 688.90 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 52 81 5.4 -9 689.00 -59.7 -58.6 -59.7 60 -99 SPO 1997 10 06 23 53 81 5.2 -9 689.00 -59.6 -58.6 -59.6 60 -99 SPO 1997 10 06 23 54 80 4.9 -9 689.00 -59.6 -58.6 -59.5 61 -99 SPO 1997 10 06 23 55 81 4.7 -9 689.00 -59.5 -58.7 -59.5 61 -99 SPO 1997 10 06 23 56 81 4.7 -9 689.00 -59.4 -58.8 -59.4 61 -99 SPO 1997 10 06 23 57 79 4.4 -9 689.00 -59.4 -58.8 -59.4 61 -99 SPO 1997 10 06 23 58 79 4.4 -9 689.00 -59.4 -58.8 -59.4 -99 -99 SPO 1997 10 06 23 59 81 4.2 -9 689.00 -59.4 -58.9 -59.4 -99 -99 SPO 1997 10 07 00 00 83 3.8 -9 689.00 -59.4 -59.0 -59.4 -99 0 SPO 1997 10 07 00 01 84 3.8 -9 689.00 -59.4 -59.0 -59.4 -99 -99 SPO 1997 10 07 00 02 87 4.0 -9 689.10 -59.4 -59.0 -59.4 -99 -99 SPO 1997 10 07 00 03 89 3.7 -9 689.10 -59.4 -59.0 -59.3 60 -99 SPO 1997 10 07 00 04 89 3.7 -9 689.10 -59.4 -59.1 -59.3 61 -99 SPO 1997 10 07 00 05 88 4.0 -9 689.10 -59.4 -59.2 -59.3 61 -99 SPO 1997 10 07 00 06 86 3.8 -9 689.10 -59.4 -59.2 -59.3 61 -99 SPO 1997 10 07 00 07 85 3.9 -9 689.10 -59.3 -59.2 -59.3 60 -99 SPO 1997 10 07 00 08 85 4.0 -9 689.10 -59.3 -59.1 -59.2 61 -99 SPO 1997 10 07 00 09 85 3.9 -9 689.10 -59.3 -59.1 -59.2 61 -99 SPO 1997 10 07 00 10 84 3.7 -9 689.10 -59.3 -59.1 -59.2 60 -99 SPO 1997 10 07 00 11 85 3.5 -9 689.10 -59.4 -59.2 -59.2 61 -99 SPO 1997 10 07 00 12 88 3.5 -9 689.20 -59.3 -59.1 -59.2 60 -99 SPO 1997 10 07 00 13 88 3.5 -9 689.10 -59.4 -59.1 -59.1 60 -99 SPO 1997 10 07 00 14 92 3.6 -9 689.10 -59.4 -59.0 -59.1 60 -99 SPO 1997 10 07 00 15 90 3.8 -9 689.10 -59.4 -59.0 -59.2 60 -99 SPO 1997 10 07 00 16 94 4.0 -9 689.10 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 00 17 92 4.1 -9 689.10 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 00 18 94 4.5 -9 689.00 -59.3 -58.8 -59.1 61 -99 SPO 1997 10 07 00 19 96 4.5 -9 689.00 -59.3 -58.7 -59.1 61 -99 SPO 1997 10 07 00 20 98 4.2 -9 689.00 -59.3 -58.6 -59.1 61 -99 SPO 1997 10 07 00 21 101 4.3 -9 689.00 -59.3 -58.7 -59.1 61 -99 SPO 1997 10 07 00 22 103 4.4 -9 689.00 -59.3 -58.7 -59.1 61 -99 SPO 1997 10 07 00 23 107 4.4 -9 689.00 -59.3 -58.8 -59.1 61 -99 SPO 1997 10 07 00 24 108 4.6 -9 689.00 -59.3 -58.8 -59.1 60 -99 SPO 1997 10 07 00 25 110 4.5 -9 689.10 -59.2 -58.8 -59.1 59 -99 SPO 1997 10 07 00 26 112 4.6 -9 689.10 -59.2 -58.8 -59.0 60 -99 SPO 1997 10 07 00 27 112 4.7 -9 689.10 -59.2 -58.9 -59.1 60 -99 SPO 1997 10 07 00 28 110 4.6 -9 689.10 -59.3 -58.9 -59.1 61 -99 SPO 1997 10 07 00 29 110 4.7 -9 689.10 -59.3 -59.0 -59.1 61 -99 SPO 1997 10 07 00 30 110 4.8 -9 689.10 -59.2 -59.0 -59.0 61 -99 SPO 1997 10 07 00 31 111 4.6 -9 689.10 -59.2 -59.0 -59.0 61 -99 SPO 1997 10 07 00 32 111 4.5 -9 689.10 -59.2 -59.0 -59.1 61 -99 SPO 1997 10 07 00 33 111 4.5 -9 689.10 -59.2 -59.1 -59.1 61 -99 SPO 1997 10 07 00 34 111 4.4 -9 689.10 -59.2 -59.1 -59.1 61 -99 SPO 1997 10 07 00 35 110 4.4 -9 689.10 -59.3 -59.1 -59.1 61 -99 SPO 1997 10 07 00 36 110 4.4 -9 689.10 -59.3 -59.0 -59.1 61 -99 SPO 1997 10 07 00 37 111 4.3 -9 689.10 -59.3 -59.0 -59.2 61 -99 SPO 1997 10 07 00 38 112 4.3 -9 689.20 -59.3 -58.9 -59.1 61 -99 SPO 1997 10 07 00 39 114 4.3 -9 689.20 -59.3 -58.9 -59.1 61 -99 SPO 1997 10 07 00 40 114 4.4 -9 689.20 -59.3 -58.8 -59.1 61 -99 SPO 1997 10 07 00 41 113 4.3 -9 689.20 -59.3 -58.8 -59.1 61 -99 SPO 1997 10 07 00 42 111 4.4 -9 689.20 -59.3 -58.7 -59.2 61 -99 SPO 1997 10 07 00 43 109 4.5 -9 689.20 -59.3 -58.7 -59.2 62 -99 SPO 1997 10 07 00 44 110 4.5 -9 689.20 -59.3 -58.6 -59.2 62 -99 SPO 1997 10 07 00 45 109 4.5 -9 689.20 -59.3 -58.6 -59.1 62 -99 SPO 1997 10 07 00 46 111 4.4 -9 689.20 -59.3 -58.6 -59.1 61 -99 SPO 1997 10 07 00 47 115 4.5 -9 689.20 -59.3 -58.6 -59.1 61 -99 SPO 1997 10 07 00 48 116 4.6 -9 689.20 -59.4 -58.7 -59.2 62 -99 SPO 1997 10 07 00 49 117 4.8 -9 689.20 -59.4 -58.8 -59.2 62 -99 SPO 1997 10 07 00 50 118 4.7 -9 689.20 -59.4 -58.8 -59.2 63 -99 SPO 1997 10 07 00 51 115 4.7 -9 689.20 -59.4 -58.7 -59.2 63 -99 SPO 1997 10 07 00 52 114 4.7 -9 689.20 -59.4 -58.7 -59.2 63 -99 SPO 1997 10 07 00 53 111 4.8 -9 689.20 -59.4 -58.7 -59.2 63 -99 SPO 1997 10 07 00 54 109 4.8 -9 689.20 -59.4 -58.7 -59.2 62 -99 SPO 1997 10 07 00 55 106 4.9 -9 689.20 -59.4 -58.6 -59.2 61 -99 SPO 1997 10 07 00 56 106 4.9 -9 689.20 -59.4 -58.7 -59.1 61 -99 SPO 1997 10 07 00 57 107 4.8 -9 689.20 -59.4 -58.7 -59.1 61 -99 SPO 1997 10 07 00 58 106 4.8 -9 689.20 -59.4 -58.7 -59.1 61 -99 SPO 1997 10 07 00 59 106 5.0 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 00 106 5.0 -9 689.20 -59.4 -58.8 -59.2 61 0 SPO 1997 10 07 01 01 104 5.2 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 02 102 5.3 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 03 102 5.4 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 04 103 5.4 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 05 104 5.2 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 06 105 5.2 -9 689.20 -59.4 -58.8 -59.2 61 -99 SPO 1997 10 07 01 07 107 5.2 -9 689.30 -59.5 -58.8 -59.2 61 -99 SPO 1997 10 07 01 08 107 5.2 -9 689.30 -59.5 -58.8 -59.3 61 -99 SPO 1997 10 07 01 09 108 5.1 -9 689.30 -59.5 -58.8 -59.3 61 -99 SPO 1997 10 07 01 10 107 5.1 -9 689.30 -59.6 -58.9 -59.4 60 -99 SPO 1997 10 07 01 11 107 4.9 -9 689.30 -59.6 -59.0 -59.4 60 -99 SPO 1997 10 07 01 12 106 4.9 -9 689.30 -59.6 -59.0 -59.4 61 -99 SPO 1997 10 07 01 13 105 4.9 -9 689.30 -59.6 -59.1 -59.4 61 -99 SPO 1997 10 07 01 14 103 4.7 -9 689.30 -59.7 -59.1 -59.4 62 -99 SPO 1997 10 07 01 15 103 4.7 -9 689.30 -59.7 -59.1 -59.4 62 -99 SPO 1997 10 07 01 16 104 4.7 -9 689.30 -59.7 -59.1 -59.5 62 -99 SPO 1997 10 07 01 17 104 4.6 -9 689.30 -59.8 -59.2 -59.5 62 -99 SPO 1997 10 07 01 18 106 4.5 -9 689.20 -59.7 -59.2 -59.5 60 -99 SPO 1997 10 07 01 19 107 4.3 -9 689.30 -59.8 -59.2 -59.6 60 -99 SPO 1997 10 07 01 20 110 4.1 -9 689.30 -59.8 -59.2 -59.6 60 -99 SPO 1997 10 07 01 21 111 4.0 -9 689.30 -59.8 -59.2 -59.6 60 -99 SPO 1997 10 07 01 22 110 4.0 -9 689.20 -59.8 -59.2 -59.7 59 -99 SPO 1997 10 07 01 23 109 4.0 -9 689.30 -59.9 -59.2 -59.7 60 -99 SPO 1997 10 07 01 24 108 4.1 -9 689.30 -59.9 -59.3 -59.8 59 -99 SPO 1997 10 07 01 25 106 4.2 -9 689.20 -59.9 -59.4 -59.8 59 -99 SPO 1997 10 07 01 26 103 4.4 -9 689.20 -59.9 -59.4 -59.8 60 -99 SPO 1997 10 07 01 27 102 4.5 -9 689.20 -59.9 -59.4 -59.8 60 -99 SPO 1997 10 07 01 28 102 4.3 -9 689.20 -60.0 -59.4 -59.8 60 -99 SPO 1997 10 07 01 29 101 4.3 -9 689.20 -60.0 -59.4 -59.8 60 -99 SPO 1997 10 07 01 30 103 4.2 -9 689.20 -60.1 -59.5 -59.9 61 -99 SPO 1997 10 07 01 31 103 4.1 -9 689.20 -60.1 -59.4 -59.9 60 -99 SPO 1997 10 07 01 32 104 4.0 -9 689.20 -60.2 -59.4 -60.0 60 -99 SPO 1997 10 07 01 33 106 3.9 -9 689.20 -60.2 -59.4 -60.0 60 -99 SPO 1997 10 07 01 34 107 3.8 -9 689.20 -60.3 -59.3 -60.1 61 -99 SPO 1997 10 07 01 35 107 3.6 -9 689.20 -60.3 -59.2 -60.1 61 -99 SPO 1997 10 07 01 36 106 3.7 -9 689.20 -60.3 -59.3 -60.1 62 -99 SPO 1997 10 07 01 37 105 3.8 -9 689.20 -60.3 -59.3 -60.2 61 -99 SPO 1997 10 07 01 38 104 3.8 -9 689.20 -60.3 -59.3 -60.2 61 -99 SPO 1997 10 07 01 39 105 3.8 -9 689.20 -60.3 -59.3 -60.2 61 -99 SPO 1997 10 07 01 40 104 3.7 -9 689.20 -60.3 -59.3 -60.1 61 -99 SPO 1997 10 07 01 41 104 3.7 -9 689.20 -60.3 -59.4 -60.2 61 -99 SPO 1997 10 07 01 42 105 3.7 -9 689.20 -60.3 -59.3 -60.2 60 -99 SPO 1997 10 07 01 43 105 3.7 -9 689.20 -60.4 -59.2 -60.2 61 -99 SPO 1997 10 07 01 44 104 3.8 -9 689.30 -60.4 -59.2 -60.3 61 -99 SPO 1997 10 07 01 45 105 3.9 -9 689.30 -60.4 -59.2 -60.3 61 -99 SPO 1997 10 07 01 46 106 4.0 -9 689.30 -60.5 -59.1 -60.3 62 -99 SPO 1997 10 07 01 47 107 4.0 -9 689.20 -60.5 -59.1 -60.4 62 -99 SPO 1997 10 07 01 48 109 4.0 -9 689.30 -60.5 -59.1 -60.4 62 -99 SPO 1997 10 07 01 49 109 4.2 -9 689.30 -60.5 -59.0 -60.4 62 -99 SPO 1997 10 07 01 50 110 4.3 -9 689.30 -60.5 -58.9 -60.4 62 -99 SPO 1997 10 07 01 51 110 4.4 -9 689.30 -60.4 -58.9 -60.4 61 -99 SPO 1997 10 07 01 52 109 4.5 -9 689.20 -60.4 -58.9 -60.4 61 -99 SPO 1997 10 07 01 53 109 4.5 -9 689.20 -60.4 -58.8 -60.3 60 -99 SPO 1997 10 07 01 54 106 4.7 -9 689.20 -60.4 -58.8 -60.3 59 -99 SPO 1997 10 07 01 55 105 4.8 -9 689.20 -60.4 -58.7 -60.3 58 -99 SPO 1997 10 07 01 56 104 5.0 -9 689.20 -60.4 -58.7 -60.3 59 -99 SPO 1997 10 07 01 57 103 5.1 -9 689.20 -60.4 -58.7 -60.2 60 -99 SPO 1997 10 07 01 58 104 5.1 -9 689.20 -60.4 -58.7 -60.2 60 -99 SPO 1997 10 07 01 59 105 5.1 -9 689.20 -60.3 -58.7 -60.2 60 -99 SPO 1997 10 07 02 00 105 5.0 -9 689.20 -60.3 -58.7 -60.2 60 0 SPO 1997 10 07 02 01 104 5.1 -9 689.20 -60.3 -58.7 -60.1 61 -99 SPO 1997 10 07 02 02 102 5.2 -9 689.20 -60.3 -58.7 -60.0 62 -99 SPO 1997 10 07 02 03 101 5.2 -9 689.20 -60.2 -58.6 -59.8 61 -99 SPO 1997 10 07 02 04 99 5.2 -9 689.20 -60.2 -58.5 -59.7 62 -99 SPO 1997 10 07 02 05 98 5.4 -9 689.20 -60.1 -58.4 -59.7 60 -99 SPO 1997 10 07 02 06 96 5.5 -9 689.20 -60.1 -58.3 -59.7 60 -99 SPO 1997 10 07 02 07 96 5.6 -9 689.20 -60.1 -58.4 -59.6 60 -99 SPO 1997 10 07 02 08 95 5.8 -9 689.20 -60.1 -58.3 -59.6 61 -99 SPO 1997 10 07 02 09 93 5.8 -9 689.20 -60.1 -58.3 -59.6 61 -99 SPO 1997 10 07 02 10 92 5.9 -9 689.20 -60.1 -58.3 -59.7 62 -99 SPO 1997 10 07 02 11 92 5.8 -9 689.20 -60.1 -58.4 -59.8 63 -99 SPO 1997 10 07 02 12 93 5.9 -9 689.20 -60.1 -58.4 -59.7 63 -99 SPO 1997 10 07 02 13 94 5.9 -9 689.20 -60.1 -58.4 -59.6 63 -99 SPO 1997 10 07 02 14 93 5.9 -9 689.20 -60.1 -58.3 -59.6 63 -99 SPO 1997 10 07 02 15 93 6.0 -9 689.20 -60.2 -58.3 -59.7 64 -99 SPO 1997 10 07 02 16 93 6.0 -9 689.10 -60.1 -58.3 -59.6 62 -99 SPO 1997 10 07 02 17 92 5.9 -9 689.10 -60.1 -58.2 -59.6 62 -99 SPO 1997 10 07 02 18 93 5.7 -9 689.20 -60.1 -58.1 -59.6 62 -99 SPO 1997 10 07 02 19 93 5.8 -9 689.10 -60.1 -58.2 -59.6 61 -99 SPO 1997 10 07 02 20 94 5.8 -9 689.20 -60.0 -58.2 -59.5 60 -99 SPO 1997 10 07 02 21 94 5.9 -9 689.20 -60.0 -58.3 -59.5 61 -99 SPO 1997 10 07 02 22 95 5.8 -9 689.20 -59.9 -58.3 -59.5 61 -99 SPO 1997 10 07 02 23 95 5.9 -9 689.20 -60.0 -58.4 -59.5 62 -99 SPO 1997 10 07 02 24 96 5.9 -9 689.20 -60.0 -58.3 -59.6 63 -99 SPO 1997 10 07 02 25 95 6.0 -9 689.20 -60.1 -58.2 -59.6 64 -99 SPO 1997 10 07 02 26 94 6.1 -9 689.10 -60.1 -58.1 -59.6 64 -99 SPO 1997 10 07 02 27 93 6.0 -9 689.10 -60.1 -58.0 -59.6 64 -99 SPO 1997 10 07 02 28 93 6.1 -9 689.10 -60.1 -57.9 -59.6 63 -99 SPO 1997 10 07 02 29 94 6.0 -9 689.10 -60.1 -57.8 -59.6 63 -99 SPO 1997 10 07 02 30 95 5.9 -9 689.10 -60.1 -57.9 -59.6 61 -99 SPO 1997 10 07 02 31 96 5.8 -9 689.10 -60.2 -57.8 -59.6 62 -99 SPO 1997 10 07 02 32 98 5.6 -9 689.10 -60.2 -57.8 -59.6 61 -99 SPO 1997 10 07 02 33 99 5.3 -9 689.20 -60.2 -57.7 -59.6 62 -99 SPO 1997 10 07 02 34 101 5.2 -9 689.20 -60.2 -57.7 -59.6 62 -99 SPO 1997 10 07 02 35 104 5.2 -9 689.20 -60.2 -57.7 -59.6 62 -99 SPO 1997 10 07 02 36 105 5.2 -9 689.30 -60.2 -57.6 -59.6 63 -99 SPO 1997 10 07 02 37 107 5.4 -9 689.20 -60.1 -57.6 -59.6 62 -99 SPO 1997 10 07 02 38 109 5.5 -9 689.20 -60.1 -57.8 -59.6 63 -99 SPO 1997 10 07 02 39 108 5.7 -9 689.20 -60.0 -57.8 -59.6 61 -99 SPO 1997 10 07 02 40 105 5.7 -9 689.20 -60.0 -57.8 -59.4 61 -99 SPO 1997 10 07 02 41 104 5.6 -9 689.10 -59.8 -57.8 -59.4 60 -99 SPO 1997 10 07 02 42 104 5.5 -9 689.10 -59.8 -57.7 -59.3 60 -99 SPO 1997 10 07 02 43 105 5.3 -9 689.10 -59.8 -57.8 -59.3 60 -99 SPO 1997 10 07 02 44 107 5.2 -9 689.10 -59.9 -57.8 -59.4 62 -99 SPO 1997 10 07 02 45 108 5.3 -9 689.10 -60.0 -57.8 -59.5 64 -99 SPO 1997 10 07 02 46 107 5.2 -9 689.10 -60.0 -57.8 -59.5 64 -99 SPO 1997 10 07 02 47 107 5.3 -9 689.10 -60.0 -57.6 -59.4 63 -99 SPO 1997 10 07 02 48 106 5.4 -9 689.10 -59.9 -57.6 -59.4 62 -99 SPO 1997 10 07 02 49 103 5.4 -9 689.10 -60.0 -57.6 -59.4 64 -99 SPO 1997 10 07 02 50 101 5.3 -9 689.10 -60.0 -57.6 -59.4 64 -99 SPO 1997 10 07 02 51 101 5.2 -9 689.10 -60.0 -57.5 -59.4 63 -99 SPO 1997 10 07 02 52 102 5.1 -9 689.00 -60.0 -57.5 -59.4 63 -99 SPO 1997 10 07 02 53 104 4.9 -9 689.00 -60.1 -57.6 -59.5 63 -99 SPO 1997 10 07 02 54 102 5.0 -9 689.00 -60.2 -57.6 -59.6 63 -99 SPO 1997 10 07 02 55 100 5.0 -9 689.00 -60.3 -57.6 -59.6 63 -99 SPO 1997 10 07 02 56 100 5.0 -9 689.00 -60.3 -57.4 -59.6 63 -99 SPO 1997 10 07 02 57 100 5.0 -9 689.00 -60.3 -57.2 -59.7 63 -99 SPO 1997 10 07 02 58 101 5.0 -9 689.10 -60.3 -57.2 -59.7 63 -99 SPO 1997 10 07 02 59 102 5.2 -9 689.10 -60.3 -57.2 -59.7 63 -99 SPO 1997 10 07 03 00 102 5.4 -9 689.10 -60.2 -57.1 -59.6 63 0 SPO 1997 10 07 03 01 105 5.6 -9 689.10 -60.0 -57.1 -59.5 61 -99 SPO 1997 10 07 03 02 104 5.5 -9 689.10 -60.0 -57.2 -59.5 61 -99 SPO 1997 10 07 03 03 102 5.4 -9 689.10 -60.0 -57.2 -59.4 62 -99 SPO 1997 10 07 03 04 103 5.5 -9 689.10 -59.8 -57.3 -59.4 60 -99 SPO 1997 10 07 03 05 102 5.5 -9 689.10 -59.7 -57.3 -59.2 60 -99 SPO 1997 10 07 03 06 102 5.5 -9 689.10 -59.6 -57.2 -59.2 60 -99 SPO 1997 10 07 03 07 106 5.5 -9 689.10 -59.6 -57.0 -59.1 60 -99 SPO 1997 10 07 03 08 108 5.2 -9 689.10 -59.6 -56.9 -59.2 61 -99 SPO 1997 10 07 03 09 112 5.1 -9 689.10 -59.7 -57.0 -59.3 63 -99 SPO 1997 10 07 03 10 113 5.0 -9 689.20 -59.8 -57.2 -59.4 64 -99 SPO 1997 10 07 03 11 114 5.0 -9 689.20 -59.9 -57.4 -59.5 64 -99 SPO 1997 10 07 03 12 114 4.9 -9 689.20 -59.9 -57.3 -59.5 64 -99 SPO 1997 10 07 03 13 114 5.3 -9 689.20 -60.0 -57.2 -59.6 64 -99 SPO 1997 10 07 03 14 113 5.4 -9 689.10 -59.9 -57.3 -59.5 63 -99 SPO 1997 10 07 03 15 112 5.8 -9 689.10 -59.9 -57.3 -59.5 61 -99 SPO 1997 10 07 03 16 111 5.8 -9 689.10 -59.9 -57.3 -59.5 61 -99 SPO 1997 10 07 03 17 109 5.7 -9 689.10 -59.9 -57.4 -59.5 61 -99 SPO 1997 10 07 03 18 109 5.7 -9 689.10 -59.8 -57.4 -59.5 60 -99 SPO 1997 10 07 03 19 108 5.7 -9 689.00 -59.8 -57.4 -59.5 61 -99 SPO 1997 10 07 03 20 107 5.8 -9 689.00 -59.8 -57.2 -59.5 61 -99 SPO 1997 10 07 03 21 106 5.8 -9 689.00 -59.9 -57.2 -59.5 62 -99 SPO 1997 10 07 03 22 105 5.9 -9 689.00 -59.9 -57.2 -59.5 62 -99 SPO 1997 10 07 03 23 105 6.0 -9 689.00 -59.9 -57.2 -59.5 63 -99 SPO 1997 10 07 03 24 105 6.2 -9 689.00 -59.9 -57.2 -59.5 63 -99 SPO 1997 10 07 03 25 106 6.4 -9 689.00 -59.8 -57.2 -59.5 62 -99 SPO 1997 10 07 03 26 107 6.5 -9 689.00 -59.7 -57.2 -59.4 60 -99 SPO 1997 10 07 03 27 106 6.4 -9 689.00 -59.4 -57.1 -59.2 58 -99 SPO 1997 10 07 03 28 105 6.2 -9 689.00 -59.4 -57.1 -59.1 59 -99 SPO 1997 10 07 03 29 106 6.3 -9 689.00 -59.4 -57.0 -59.2 59 -99 SPO 1997 10 07 03 30 106 6.1 -9 689.00 -59.4 -57.0 -59.2 61 -99 SPO 1997 10 07 03 31 105 6.0 -9 689.00 -59.6 -57.1 -59.3 62 -99 SPO 1997 10 07 03 32 105 6.0 -9 689.00 -59.6 -57.2 -59.4 62 -99 SPO 1997 10 07 03 33 105 6.0 -9 689.00 -59.7 -57.2 -59.4 63 -99 SPO 1997 10 07 03 34 106 6.3 -9 689.00 -59.7 -57.1 -59.5 63 -99 SPO 1997 10 07 03 35 106 6.5 -9 689.00 -59.7 -57.0 -59.5 63 -99 SPO 1997 10 07 03 36 106 6.6 -9 689.00 -59.6 -57.0 -59.4 62 -99 SPO 1997 10 07 03 37 104 6.3 -9 689.00 -59.5 -57.0 -59.3 61 -99 SPO 1997 10 07 03 38 104 6.3 -9 689.00 -59.5 -57.1 -59.4 61 -99 SPO 1997 10 07 03 39 103 6.2 -9 689.00 -59.6 -57.2 -59.4 61 -99 SPO 1997 10 07 03 40 103 6.1 -9 689.10 -59.7 -57.2 -59.5 61 -99 SPO 1997 10 07 03 41 103 5.9 -9 689.10 -59.8 -57.4 -59.6 62 -99 SPO 1997 10 07 03 42 101 5.9 -9 689.00 -60.0 -57.4 -59.7 63 -99 SPO 1997 10 07 03 43 99 6.0 -9 689.00 -60.1 -57.0 -59.8 63 -99 SPO 1997 10 07 03 44 97 6.2 -9 689.00 -60.2 -56.8 -59.9 64 -99 SPO 1997 10 07 03 45 97 6.3 -9 689.00 -60.2 -56.7 -60.0 64 -99 SPO 1997 10 07 03 46 97 6.4 -9 689.00 -60.3 -56.7 -60.0 63 -99 SPO 1997 10 07 03 47 97 6.3 -9 689.00 -60.4 -56.7 -60.1 63 -99 SPO 1997 10 07 03 48 97 6.4 -9 689.00 -60.4 -56.7 -60.1 62 -99 SPO 1997 10 07 03 49 98 6.7 -9 689.00 -60.3 -56.7 -60.0 61 -99 SPO 1997 10 07 03 50 99 6.8 -9 689.00 -60.1 -56.6 -59.8 59 -99 SPO 1997 10 07 03 51 100 6.8 -9 689.00 -59.8 -56.6 -59.7 57 -99 SPO 1997 10 07 03 52 99 6.7 -9 689.00 -59.8 -56.5 -59.6 57 -99 SPO 1997 10 07 03 53 99 6.7 -9 689.00 -59.8 -56.5 -59.6 58 -99 SPO 1997 10 07 03 54 98 6.9 -9 689.00 -59.8 -56.5 -59.6 59 -99 SPO 1997 10 07 03 55 97 6.8 -9 689.00 -59.8 -56.5 -59.7 60 -99 SPO 1997 10 07 03 56 98 6.5 -9 689.00 -59.8 -56.5 -59.6 60 -99 SPO 1997 10 07 03 57 99 6.2 -9 689.00 -59.8 -56.7 -59.6 60 -99 SPO 1997 10 07 03 58 100 6.1 -9 689.00 -59.7 -56.8 -59.5 60 -99 SPO 1997 10 07 03 59 100 5.9 -9 689.00 -59.8 -56.8 -59.5 61 -99 SPO 1997 10 07 04 00 100 5.8 -9 689.00 -59.8 -56.9 -59.5 60 0 SPO 1997 10 07 04 01 99 5.7 -9 689.00 -59.8 -57.0 -59.5 60 -99 SPO 1997 10 07 04 02 99 5.9 -9 689.00 -59.8 -57.1 -59.5 60 -99 SPO 1997 10 07 04 03 98 6.0 -9 689.00 -59.6 -57.2 -59.4 59 -99 SPO 1997 10 07 04 04 97 6.6 -9 689.00 -59.5 -57.0 -59.3 59 -99 SPO 1997 10 07 04 05 96 6.6 -9 689.00 -59.3 -57.1 -59.1 58 -99 SPO 1997 10 07 04 06 97 6.2 -9 689.00 -59.2 -57.4 -59.0 59 -99 SPO 1997 10 07 04 07 98 6.1 -9 689.00 -59.2 -57.3 -59.0 61 -99 SPO 1997 10 07 04 08 99 5.9 -9 689.00 -59.3 -57.5 -59.0 61 -99 SPO 1997 10 07 04 09 100 5.8 -9 689.00 -59.4 -57.6 -59.1 62 -99 SPO 1997 10 07 04 10 99 5.7 -9 689.10 -59.4 -57.5 -59.1 62 -99 SPO 1997 10 07 04 11 98 5.6 -9 689.00 -59.4 -57.4 -59.2 61 -99 SPO 1997 10 07 04 12 97 5.6 -9 689.00 -59.5 -57.4 -59.2 62 -99 SPO 1997 10 07 04 13 97 5.4 -9 689.10 -59.5 -57.6 -59.2 62 -99 SPO 1997 10 07 04 14 98 5.2 -9 689.10 -59.6 -57.7 -59.2 63 -99 SPO 1997 10 07 04 15 98 5.0 -9 689.10 -59.6 -57.7 -59.2 63 -99 SPO 1997 10 07 04 16 96 5.0 -9 689.10 -59.6 -57.6 -59.2 64 -99 SPO 1997 10 07 04 17 96 5.1 -9 689.10 -59.7 -57.5 -59.2 64 -99 SPO 1997 10 07 04 18 96 5.1 -9 689.00 -59.7 -57.5 -59.2 64 -99 SPO 1997 10 07 04 19 96 5.2 -9 689.00 -59.6 -57.4 -59.2 63 -99 SPO 1997 10 07 04 20 96 5.3 -9 689.00 -59.6 -57.3 -59.2 63 -99 SPO 1997 10 07 04 21 97 5.2 -9 689.00 -59.6 -57.3 -59.2 63 -99 SPO 1997 10 07 04 22 96 5.2 -9 689.00 -59.5 -57.4 -59.1 62 -99 SPO 1997 10 07 04 23 96 5.3 -9 689.00 -59.5 -57.4 -59.1 62 -99 SPO 1997 10 07 04 24 96 5.3 -9 689.00 -59.4 -57.5 -59.1 61 -99 SPO 1997 10 07 04 25 95 5.2 -9 689.00 -59.4 -57.5 -59.0 61 -99 SPO 1997 10 07 04 26 93 5.3 -9 689.00 -59.4 -57.6 -59.0 61 -99 SPO 1997 10 07 04 27 92 5.2 -9 689.00 -59.3 -57.6 -59.0 61 -99 SPO 1997 10 07 04 28 91 5.2 -9 689.00 -59.3 -57.5 -59.0 62 -99 SPO 1997 10 07 04 29 90 5.3 -9 689.00 -59.3 -57.4 -59.0 62 -99 SPO 1997 10 07 04 30 90 5.1 -9 689.00 -59.3 -57.4 -59.0 63 -99 SPO 1997 10 07 04 31 89 5.1 -9 689.00 -59.2 -57.4 -58.9 62 -99 SPO 1997 10 07 04 32 88 5.2 -9 689.00 -59.2 -57.4 -58.9 62 -99 SPO 1997 10 07 04 33 88 5.3 -9 689.00 -59.0 -57.3 -58.8 61 -99 SPO 1997 10 07 04 34 87 5.3 -9 689.00 -58.9 -57.3 -58.7 61 -99 SPO 1997 10 07 04 35 86 5.4 -9 689.00 -58.9 -57.3 -58.7 61 -99 SPO 1997 10 07 04 36 86 5.3 -9 689.00 -58.9 -57.2 -58.7 61 -99 SPO 1997 10 07 04 37 85 5.3 -9 689.00 -58.9 -57.2 -58.7 61 -99 SPO 1997 10 07 04 38 84 5.3 -9 689.00 -58.9 -57.2 -58.7 61 -99 SPO 1997 10 07 04 39 83 5.5 -9 689.00 -58.9 -57.2 -58.7 61 -99 SPO 1997 10 07 04 40 81 5.7 -9 689.00 -58.8 -57.1 -58.6 62 -99 SPO 1997 10 07 04 41 81 5.6 -9 689.00 -58.7 -57.1 -58.6 63 -99 SPO 1997 10 07 04 42 81 5.5 -9 689.00 -58.7 -57.0 -58.6 63 -99 SPO 1997 10 07 04 43 81 5.5 -9 689.00 -58.7 -57.0 -58.6 63 -99 SPO 1997 10 07 04 44 82 5.4 -9 689.00 -58.7 -56.9 -58.6 63 -99 SPO 1997 10 07 04 45 81 5.4 -9 689.00 -58.8 -57.0 -58.6 64 -99 SPO 1997 10 07 04 46 81 5.5 -9 689.00 -58.7 -56.8 -58.6 63 -99 SPO 1997 10 07 04 47 81 5.5 -9 688.90 -58.7 -56.7 -58.6 62 -99 SPO 1997 10 07 04 48 82 5.4 -9 689.00 -58.8 -56.7 -58.6 63 -99 SPO 1997 10 07 04 49 82 5.5 -9 689.00 -58.8 -56.6 -58.6 63 -99 SPO 1997 10 07 04 50 82 5.5 -9 689.00 -58.7 -56.6 -58.5 62 -99 SPO 1997 10 07 04 51 82 5.7 -9 689.00 -58.7 -56.5 -58.5 63 -99 SPO 1997 10 07 04 52 81 5.7 -9 689.00 -58.7 -56.4 -58.5 63 -99 SPO 1997 10 07 04 53 81 5.9 -9 689.00 -58.7 -56.3 -58.5 63 -99 SPO 1997 10 07 04 54 81 5.9 -9 689.00 -58.7 -56.3 -58.5 63 -99 SPO 1997 10 07 04 55 81 6.0 -9 689.00 -58.7 -56.3 -58.5 63 -99 SPO 1997 10 07 04 56 80 6.1 -9 689.00 -58.6 -56.2 -58.5 62 -99 SPO 1997 10 07 04 57 79 6.1 -9 689.00 -58.6 -56.2 -58.5 62 -99 SPO 1997 10 07 04 58 78 6.1 -9 689.00 -58.6 -56.3 -58.5 62 -99 SPO 1997 10 07 04 59 79 6.2 -9 689.00 -58.6 -56.2 -58.4 62 -99 SPO 1997 10 07 05 00 78 6.4 -9 689.00 -58.5 -56.2 -58.4 62 0 SPO 1997 10 07 05 01 78 6.6 -9 689.00 -58.4 -56.1 -58.3 61 -99 SPO 1997 10 07 05 02 77 6.6 -9 689.00 -58.3 -56.0 -58.2 61 -99 SPO 1997 10 07 05 03 77 6.5 -9 688.90 -58.3 -55.9 -58.2 62 -99 SPO 1997 10 07 05 04 78 6.4 -9 689.00 -58.3 -55.8 -58.2 62 -99 SPO 1997 10 07 05 05 78 6.3 -9 689.00 -58.3 -55.8 -58.2 62 -99 SPO 1997 10 07 05 06 79 6.0 -9 688.90 -58.2 -55.9 -58.1 62 -99 SPO 1997 10 07 05 07 80 5.8 -9 689.00 -58.2 -56.0 -58.1 62 -99 SPO 1997 10 07 05 08 81 5.6 -9 689.00 -58.2 -56.0 -58.0 62 -99 SPO 1997 10 07 05 09 81 5.6 -9 688.90 -58.2 -56.1 -58.0 62 -99 SPO 1997 10 07 05 10 82 5.4 -9 689.00 -58.2 -56.1 -58.0 62 -99 SPO 1997 10 07 05 11 82 5.2 -9 689.00 -58.3 -56.2 -58.0 63 -99 SPO 1997 10 07 05 12 83 5.0 -9 689.00 -58.3 -56.3 -58.0 63 -99 SPO 1997 10 07 05 13 82 5.1 -9 689.00 -58.3 -56.4 -58.0 63 -99 SPO 1997 10 07 05 14 82 5.1 -9 689.00 -58.2 -56.4 -58.0 62 -99 SPO 1997 10 07 05 15 82 5.0 -9 689.00 -58.2 -56.2 -58.0 62 -99 SPO 1997 10 07 05 16 80 5.0 -9 689.00 -58.2 -56.2 -58.0 62 -99 SPO 1997 10 07 05 17 79 5.1 -9 689.00 -58.2 -56.2 -58.0 63 -99 SPO 1997 10 07 05 18 79 5.0 -9 689.00 -58.2 -56.1 -58.0 63 -99 SPO 1997 10 07 05 19 79 5.0 -9 689.00 -58.1 -56.0 -58.0 62 -99 SPO 1997 10 07 05 20 78 5.1 -9 689.00 -58.1 -55.9 -58.0 62 -99 SPO 1997 10 07 05 21 77 5.1 -9 689.00 -58.1 -56.0 -58.0 62 -99 SPO 1997 10 07 05 22 77 5.5 -9 689.00 -58.1 -56.1 -58.0 62 -99 SPO 1997 10 07 05 23 75 5.9 -9 689.00 -58.1 -56.0 -57.9 62 -99 SPO 1997 10 07 05 24 74 6.2 -9 689.00 -58.1 -55.8 -58.0 62 -99 SPO 1997 10 07 05 25 73 6.5 -9 689.00 -58.2 -55.8 -58.0 63 -99 SPO 1997 10 07 05 26 72 6.9 -9 688.90 -58.2 -55.6 -58.0 63 -99 SPO 1997 10 07 05 27 71 7.1 -9 688.90 -58.1 -55.5 -58.0 62 -99 SPO 1997 10 07 05 28 71 7.0 -9 688.90 -58.0 -55.4 -57.9 62 -99 SPO 1997 10 07 05 29 71 7.2 -9 688.90 -58.0 -55.2 -57.9 62 -99 SPO 1997 10 07 05 30 71 7.3 -9 688.90 -57.9 -55.1 -57.8 62 -99 SPO 1997 10 07 05 31 71 7.2 -9 688.90 -57.8 -55.0 -57.7 63 -99 SPO 1997 10 07 05 32 70 6.9 -9 688.90 -57.7 -55.1 -57.6 63 -99 SPO 1997 10 07 05 33 71 6.9 -9 688.90 -57.7 -55.2 -57.6 61 -99 SPO 1997 10 07 05 34 71 6.7 -9 688.90 -57.7 -55.2 -57.6 61 -99 SPO 1997 10 07 05 35 71 6.8 -9 688.90 -57.6 -55.2 -57.6 62 -99 SPO 1997 10 07 05 36 70 7.3 -9 688.90 -57.7 -54.8 -57.6 63 -99 SPO 1997 10 07 05 37 70 7.6 -9 688.90 -57.7 -54.6 -57.6 63 -99 SPO 1997 10 07 05 38 70 7.7 -9 688.90 -57.7 -54.7 -57.6 64 -99 SPO 1997 10 07 05 39 69 7.8 -9 688.90 -57.7 -54.7 -57.6 64 -99 SPO 1997 10 07 05 40 69 7.8 -9 688.90 -57.7 -54.7 -57.7 64 -99 SPO 1997 10 07 05 41 70 7.6 -9 688.90 -57.7 -54.7 -57.6 64 -99 SPO 1997 10 07 05 42 70 7.6 -9 688.90 -57.7 -54.7 -57.6 64 -99 SPO 1997 10 07 05 43 70 7.5 -9 688.90 -57.7 -54.8 -57.6 64 -99 SPO 1997 10 07 05 44 70 7.7 -9 688.90 -57.7 -54.8 -57.6 63 -99 SPO 1997 10 07 05 45 70 7.7 -9 688.90 -57.6 -54.8 -57.5 63 -99 SPO 1997 10 07 05 46 71 7.6 -9 688.90 -57.6 -54.9 -57.5 63 -99 SPO 1997 10 07 05 47 72 7.5 -9 688.90 -57.6 -55.1 -57.4 63 -99 SPO 1997 10 07 05 48 73 7.3 -9 688.90 -57.5 -55.2 -57.4 63 -99 SPO 1997 10 07 05 49 75 7.1 -9 688.90 -57.5 -55.3 -57.4 63 -99 SPO 1997 10 07 05 50 75 6.9 -9 688.90 -57.5 -55.3 -57.3 63 -99 SPO 1997 10 07 05 51 75 6.7 -9 688.90 -57.5 -55.4 -57.3 64 -99 SPO 1997 10 07 05 52 76 6.4 -9 689.00 -57.5 -55.6 -57.2 64 -99 SPO 1997 10 07 05 53 76 6.1 -9 689.00 -57.5 -55.7 -57.3 65 -99 SPO 1997 10 07 05 54 75 6.0 -9 689.00 -57.6 -55.8 -57.4 67 -99 SPO 1997 10 07 05 55 74 6.1 -9 689.00 -57.8 -55.8 -57.5 68 -99 SPO 1997 10 07 05 56 74 6.1 -9 689.00 -57.9 -55.8 -57.5 67 -99 SPO 1997 10 07 05 57 73 6.2 -9 689.00 -57.8 -55.8 -57.5 66 -99 SPO 1997 10 07 05 58 73 6.3 -9 688.90 -57.8 -55.8 -57.5 65 -99 SPO 1997 10 07 05 59 73 6.4 -9 689.00 -57.8 -55.7 -57.5 64 -99 SPO 1997 10 07 06 00 73 6.4 -9 689.00 -57.8 -55.6 -57.5 64 0 SPO 1997 10 07 06 01 73 6.3 -9 688.90 -57.8 -55.6 -57.5 64 -99 SPO 1997 10 07 06 02 73 6.4 -9 688.90 -57.7 -55.6 -57.4 63 -99 SPO 1997 10 07 06 03 74 6.4 -9 689.00 -57.7 -55.7 -57.4 63 -99 SPO 1997 10 07 06 04 74 6.3 -9 688.90 -57.6 -55.6 -57.3 63 -99 SPO 1997 10 07 06 05 73 6.2 -9 689.00 -57.6 -55.4 -57.3 64 -99 SPO 1997 10 07 06 06 73 6.3 -9 689.00 -57.6 -55.5 -57.2 64 -99 SPO 1997 10 07 06 07 73 6.0 -9 688.90 -57.6 -55.5 -57.2 63 -99 SPO 1997 10 07 06 08 73 5.7 -9 688.90 -57.6 -55.6 -57.2 63 -99 SPO 1997 10 07 06 09 73 5.9 -9 689.00 -57.6 -55.8 -57.2 63 -99 SPO 1997 10 07 06 10 74 5.7 -9 689.00 -57.6 -55.9 -57.2 63 -99 SPO 1997 10 07 06 11 75 5.7 -9 689.00 -57.6 -55.9 -57.2 63 -99 SPO 1997 10 07 06 12 75 5.6 -9 689.00 -57.6 -55.9 -57.2 64 -99 SPO 1997 10 07 06 13 74 5.4 -9 689.00 -57.6 -56.0 -57.2 64 -99 SPO 1997 10 07 06 14 73 5.5 -9 689.00 -57.6 -55.9 -57.2 65 -99 SPO 1997 10 07 06 15 74 5.5 -9 689.00 -57.6 -55.9 -57.1 65 -99 SPO 1997 10 07 06 16 74 5.7 -9 689.00 -57.5 -55.8 -57.0 64 -99 SPO 1997 10 07 06 17 73 5.6 -9 689.00 -57.5 -55.7 -57.0 64 -99 SPO 1997 10 07 06 18 72 5.5 -9 689.00 -57.4 -55.7 -57.0 64 -99 SPO 1997 10 07 06 19 71 5.0 -9 689.00 -57.4 -55.8 -57.0 64 -99 SPO 1997 10 07 06 20 70 4.7 -9 689.00 -57.5 -56.0 -57.0 64 -99 SPO 1997 10 07 06 21 70 4.8 -9 689.10 -57.5 -56.2 -57.0 64 -99 SPO 1997 10 07 06 22 71 4.6 -9 689.00 -57.5 -56.2 -57.0 63 -99 SPO 1997 10 07 06 23 71 4.5 -9 689.10 -57.6 -56.3 -57.1 64 -99 SPO 1997 10 07 06 24 71 4.5 -9 689.00 -57.6 -56.4 -57.1 65 -99 SPO 1997 10 07 06 25 72 4.7 -9 689.00 -57.7 -56.4 -57.1 66 -99 SPO 1997 10 07 06 26 72 4.3 -9 689.00 -57.6 -56.4 -57.1 66 -99 SPO 1997 10 07 06 27 73 4.6 -9 689.10 -57.7 -56.4 -57.1 67 -99 SPO 1997 10 07 06 28 74 4.4 -9 689.10 -57.7 -56.3 -57.1 67 -99 SPO 1997 10 07 06 29 74 4.4 -9 689.10 -57.8 -56.4 -57.1 67 -99 SPO 1997 10 07 06 30 75 4.2 -9 689.10 -57.8 -56.4 -57.1 67 -99 SPO 1997 10 07 06 31 76 4.2 -9 689.10 -57.9 -56.5 -57.2 67 -99 SPO 1997 10 07 06 32 77 4.0 -9 689.10 -57.9 -56.4 -57.1 66 -99 SPO 1997 10 07 06 33 79 4.0 -9 689.10 -58.0 -56.4 -57.1 65 -99 SPO 1997 10 07 06 34 79 4.0 -9 689.10 -58.0 -56.5 -57.1 65 -99 SPO 1997 10 07 06 35 80 4.0 -9 689.20 -58.1 -56.6 -57.1 64 -99 SPO 1997 10 07 06 36 81 4.0 -9 689.20 -58.1 -56.8 -57.2 64 -99 SPO 1997 10 07 06 37 82 4.1 -9 689.20 -58.1 -56.9 -57.2 63 -99 SPO 1997 10 07 06 38 82 4.1 -9 689.20 -58.1 -57.0 -57.2 62 -99 SPO 1997 10 07 06 39 81 3.9 -9 689.20 -58.1 -57.1 -57.2 63 -99 SPO 1997 10 07 06 40 80 3.8 -9 689.20 -58.2 -57.2 -57.3 64 -99 SPO 1997 10 07 06 41 80 3.7 -9 689.20 -58.3 -57.2 -57.4 65 -99 SPO 1997 10 07 06 42 81 3.8 -9 689.20 -58.4 -57.2 -57.5 66 -99 SPO 1997 10 07 06 43 81 3.8 -9 689.20 -58.5 -57.1 -57.5 65 -99 SPO 1997 10 07 06 44 82 3.8 -9 689.20 -58.5 -57.0 -57.6 64 -99 SPO 1997 10 07 06 45 82 3.9 -9 689.20 -58.6 -56.9 -57.6 64 -99 SPO 1997 10 07 06 46 81 4.1 -9 689.20 -58.6 -56.8 -57.6 63 -99 SPO 1997 10 07 06 47 81 4.2 -9 689.20 -58.7 -56.6 -57.8 64 -99 SPO 1997 10 07 06 48 81 4.3 -9 689.20 -58.8 -56.5 -57.8 64 -99 SPO 1997 10 07 06 49 82 4.5 -9 689.20 -58.8 -56.5 -57.9 64 -99 SPO 1997 10 07 06 50 82 4.5 -9 689.20 -58.9 -56.5 -57.9 64 -99 SPO 1997 10 07 06 51 82 4.5 -9 689.20 -58.8 -56.5 -57.9 63 -99 SPO 1997 10 07 06 52 82 4.5 -9 689.20 -58.8 -56.6 -57.8 63 -99 SPO 1997 10 07 06 53 82 4.4 -9 689.20 -58.7 -56.7 -57.8 61 -99 SPO 1997 10 07 06 54 80 4.3 -9 689.20 -58.6 -56.8 -57.8 61 -99 SPO 1997 10 07 06 55 79 4.2 -9 689.20 -58.7 -56.9 -57.8 61 -99 SPO 1997 10 07 06 56 79 4.3 -9 689.10 -58.7 -56.8 -57.8 61 -99 SPO 1997 10 07 06 57 78 4.2 -9 689.20 -58.7 -56.8 -57.8 61 -99 SPO 1997 10 07 06 58 76 4.1 -9 689.20 -58.7 -56.8 -57.9 61 -99 SPO 1997 10 07 06 59 77 4.3 -9 689.20 -58.8 -56.9 -57.9 62 -99 SPO 1997 10 07 07 00 76 4.5 -9 689.10 -58.7 -56.9 -58.0 61 0 SPO 1997 10 07 07 01 75 4.5 -9 689.10 -58.7 -56.8 -58.0 61 -99 SPO 1997 10 07 07 02 75 4.6 -9 689.10 -58.7 -56.8 -58.0 62 -99 SPO 1997 10 07 07 03 74 4.5 -9 689.10 -58.7 -56.8 -58.0 62 -99 SPO 1997 10 07 07 04 72 4.5 -9 689.10 -58.7 -57.0 -58.0 62 -99 SPO 1997 10 07 07 05 71 4.4 -9 689.10 -58.8 -57.0 -58.1 63 -99 SPO 1997 10 07 07 06 71 4.3 -9 689.10 -58.9 -57.0 -58.2 63 -99 SPO 1997 10 07 07 07 72 4.3 -9 689.10 -58.9 -57.0 -58.2 63 -99 SPO 1997 10 07 07 08 72 4.3 -9 689.10 -59.0 -57.0 -58.2 62 -99 SPO 1997 10 07 07 09 71 4.5 -9 689.10 -59.1 -57.0 -58.3 62 -99 SPO 1997 10 07 07 10 73 4.7 -9 689.10 -59.0 -57.0 -58.3 61 -99 SPO 1997 10 07 07 11 73 4.8 -9 689.10 -59.0 -57.0 -58.3 61 -99 SPO 1997 10 07 07 12 72 4.9 -9 689.10 -58.9 -57.0 -58.2 61 -99 SPO 1997 10 07 07 13 72 5.0 -9 689.10 -58.8 -57.0 -58.1 61 -99 SPO 1997 10 07 07 14 72 5.1 -9 689.10 -58.7 -57.0 -58.0 61 -99 SPO 1997 10 07 07 15 71 5.2 -9 689.10 -58.6 -57.0 -58.0 62 -99 SPO 1997 10 07 07 16 71 5.2 -9 689.10 -58.6 -56.9 -58.0 62 -99 SPO 1997 10 07 07 17 70 5.2 -9 689.10 -58.6 -56.9 -58.0 62 -99 SPO 1997 10 07 07 18 69 5.1 -9 689.00 -58.5 -56.9 -57.9 62 -99 SPO 1997 10 07 07 19 70 4.9 -9 689.10 -58.5 -57.0 -57.9 63 -99 SPO 1997 10 07 07 20 69 4.8 -9 689.10 -58.5 -57.0 -57.9 63 -99 SPO 1997 10 07 07 21 69 4.8 -9 689.10 -58.5 -57.1 -57.9 62 -99 SPO 1997 10 07 07 22 70 4.7 -9 689.10 -58.6 -57.2 -57.9 63 -99 SPO 1997 10 07 07 23 69 4.8 -9 689.10 -58.6 -57.2 -58.0 63 -99 SPO 1997 10 07 07 24 70 4.8 -9 689.10 -58.6 -57.2 -57.9 63 -99 SPO 1997 10 07 07 25 71 4.7 -9 689.10 -58.5 -57.1 -57.9 63 -99 SPO 1997 10 07 07 26 72 4.6 -9 689.10 -58.6 -57.1 -57.9 64 -99 SPO 1997 10 07 07 27 71 4.6 -9 689.10 -58.5 -57.1 -57.9 63 -99 SPO 1997 10 07 07 28 71 4.6 -9 689.20 -58.6 -57.1 -57.9 64 -99 SPO 1997 10 07 07 29 71 4.4 -9 689.20 -58.6 -57.1 -57.9 65 -99 SPO 1997 10 07 07 30 70 4.4 -9 689.20 -58.7 -57.2 -57.9 65 -99 SPO 1997 10 07 07 31 70 4.5 -9 689.20 -58.7 -57.0 -57.9 65 -99 SPO 1997 10 07 07 32 71 4.5 -9 689.20 -58.7 -57.0 -57.9 64 -99 SPO 1997 10 07 07 33 73 4.4 -9 689.20 -58.7 -57.0 -57.9 64 -99 SPO 1997 10 07 07 34 73 4.3 -9 689.20 -58.6 -57.1 -57.9 62 -99 SPO 1997 10 07 07 35 74 4.1 -9 689.20 -58.6 -57.1 -57.8 62 -99 SPO 1997 10 07 07 36 73 3.9 -9 689.30 -58.6 -57.1 -57.8 63 -99 SPO 1997 10 07 07 37 74 3.9 -9 689.30 -58.6 -57.2 -57.8 64 -99 SPO 1997 10 07 07 38 74 3.8 -9 689.20 -58.6 -57.3 -57.8 64 -99 SPO 1997 10 07 07 39 74 3.8 -9 689.20 -58.6 -57.2 -57.8 64 -99 SPO 1997 10 07 07 40 73 3.5 -9 689.30 -58.6 -57.2 -57.7 64 -99 SPO 1997 10 07 07 41 74 3.4 -9 689.20 -58.7 -57.3 -57.7 65 -99 SPO 1997 10 07 07 42 76 3.3 -9 689.20 -58.7 -57.3 -57.6 65 -99 SPO 1997 10 07 07 43 75 3.2 -9 689.30 -58.7 -57.2 -57.6 65 -99 SPO 1997 10 07 07 44 75 3.2 -9 689.30 -58.6 -57.2 -57.6 64 -99 SPO 1997 10 07 07 45 76 3.3 -9 689.20 -58.6 -57.1 -57.6 64 -99 SPO 1997 10 07 07 46 77 3.4 -9 689.30 -58.5 -57.1 -57.5 63 -99 SPO 1997 10 07 07 47 78 3.4 -9 689.20 -58.4 -57.0 -57.4 62 -99 SPO 1997 10 07 07 48 78 3.6 -9 689.20 -58.4 -57.0 -57.4 63 -99 SPO 1997 10 07 07 49 78 3.9 -9 689.20 -58.4 -57.0 -57.4 64 -99 SPO 1997 10 07 07 50 79 4.0 -9 689.20 -58.4 -56.9 -57.4 64 -99 SPO 1997 10 07 07 51 77 4.2 -9 689.20 -58.3 -56.9 -57.4 63 -99 SPO 1997 10 07 07 52 76 4.3 -9 689.20 -58.4 -56.9 -57.5 64 -99 SPO 1997 10 07 07 53 76 4.5 -9 689.20 -58.4 -56.8 -57.6 65 -99 SPO 1997 10 07 07 54 75 4.6 -9 689.20 -58.4 -56.8 -57.6 65 -99 SPO 1997 10 07 07 55 74 4.8 -9 689.20 -58.4 -56.7 -57.7 65 -99 SPO 1997 10 07 07 56 74 4.8 -9 689.20 -58.4 -56.6 -57.7 64 -99 SPO 1997 10 07 07 57 75 4.8 -9 689.20 -58.5 -56.6 -57.7 65 -99 SPO 1997 10 07 07 58 77 4.9 -9 689.20 -58.5 -56.5 -57.7 65 -99 SPO 1997 10 07 07 59 78 4.9 -9 689.20 -58.4 -56.5 -57.6 63 -99 SPO 1997 10 07 08 00 79 4.6 -9 689.20 -58.4 -56.4 -57.6 63 0 SPO 1997 10 07 08 01 80 4.2 -9 689.20 -58.4 -56.5 -57.6 64 -99 SPO 1997 10 07 08 02 79 4.0 -9 689.20 -58.5 -56.7 -57.6 65 -99 SPO 1997 10 07 08 03 79 3.8 -9 689.20 -58.5 -56.8 -57.5 66 -99 SPO 1997 10 07 08 04 77 3.6 -9 689.20 -58.5 -56.9 -57.5 66 -99 SPO 1997 10 07 08 05 77 3.4 -9 689.20 -58.6 -56.9 -57.5 66 -99 SPO 1997 10 07 08 06 76 3.4 -9 689.20 -58.6 -56.9 -57.5 66 -99 SPO 1997 10 07 08 07 77 3.3 -9 689.20 -58.6 -56.8 -57.5 66 -99 SPO 1997 10 07 08 08 80 3.4 -9 689.20 -58.5 -56.6 -57.4 65 -99 SPO 1997 10 07 08 09 82 3.5 -9 689.20 -58.4 -56.5 -57.3 64 -99 SPO 1997 10 07 08 10 84 3.4 -9 689.20 -58.3 -56.4 -57.2 62 -99 SPO 1997 10 07 08 11 84 3.7 -9 689.20 -58.2 -56.5 -57.0 62 -99 SPO 1997 10 07 08 12 85 3.6 -9 689.20 -58.2 -56.7 -57.0 62 -99 SPO 1997 10 07 08 13 85 3.7 -9 689.20 -58.2 -56.8 -57.0 63 -99 SPO 1997 10 07 08 14 84 3.6 -9 689.20 -58.2 -57.0 -56.9 64 -99 SPO 1997 10 07 08 15 83 3.6 -9 689.30 -58.2 -57.0 -57.0 65 -99 SPO 1997 10 07 08 16 82 3.5 -9 689.30 -58.2 -57.1 -57.1 65 -99 SPO 1997 10 07 08 17 82 3.5 -9 689.30 -58.2 -57.1 -57.1 65 -99 SPO 1997 10 07 08 18 82 3.5 -9 689.30 -58.3 -57.0 -57.2 66 -99 SPO 1997 10 07 08 19 82 3.6 -9 689.30 -58.3 -57.0 -57.2 66 -99 SPO 1997 10 07 08 20 80 3.6 -9 689.30 -58.3 -57.0 -57.2 66 -99 SPO 1997 10 07 08 21 77 3.5 -9 689.30 -58.3 -56.9 -57.3 65 -99 SPO 1997 10 07 08 22 76 3.5 -9 689.30 -58.4 -56.8 -57.4 66 -99 SPO 1997 10 07 08 23 78 3.5 -9 689.40 -58.4 -56.7 -57.5 65 -99 SPO 1997 10 07 08 24 77 3.8 -9 689.30 -58.4 -56.5 -57.5 65 -99 SPO 1997 10 07 08 25 78 4.0 -9 689.30 -58.4 -56.4 -57.5 65 -99 SPO 1997 10 07 08 26 81 4.0 -9 689.30 -58.4 -56.5 -57.4 65 -99 SPO 1997 10 07 08 27 83 3.9 -9 689.30 -58.3 -56.6 -57.4 64 -99 SPO 1997 10 07 08 28 83 3.7 -9 689.30 -58.2 -56.8 -57.2 63 -99 SPO 1997 10 07 08 29 85 3.6 -9 689.30 -58.2 -57.0 -57.2 64 -99 SPO 1997 10 07 08 30 85 3.5 -9 689.30 -58.2 -57.1 -57.1 65 -99 SPO 1997 10 07 08 31 85 3.2 -9 689.30 -58.3 -57.2 -57.0 66 -99 SPO 1997 10 07 08 32 82 3.3 -9 689.30 -58.4 -57.3 -57.1 66 -99 SPO 1997 10 07 08 33 81 3.2 -9 689.30 -58.4 -57.3 -57.1 66 -99 SPO 1997 10 07 08 34 80 3.2 -9 689.30 -58.4 -57.4 -57.2 66 -99 SPO 1997 10 07 08 35 79 3.3 -9 689.40 -58.5 -57.3 -57.3 66 -99 SPO 1997 10 07 08 36 80 3.5 -9 689.40 -58.4 -57.3 -57.4 65 -99 SPO 1997 10 07 08 37 80 3.6 -9 689.40 -58.4 -57.3 -57.4 65 -99 SPO 1997 10 07 08 38 80 3.9 -9 689.30 -58.4 -57.3 -57.4 65 -99 SPO 1997 10 07 08 39 80 4.0 -9 689.30 -58.4 -57.3 -57.4 65 -99 SPO 1997 10 07 08 40 78 4.3 -9 689.30 -58.4 -57.3 -57.5 66 -99 SPO 1997 10 07 08 41 77 4.3 -9 689.30 -58.4 -57.3 -57.6 66 -99 SPO 1997 10 07 08 42 76 4.5 -9 689.30 -58.4 -57.3 -57.6 66 -99 SPO 1997 10 07 08 43 78 4.8 -9 689.20 -58.4 -57.3 -57.7 65 -99 SPO 1997 10 07 08 44 77 4.8 -9 689.20 -58.4 -57.3 -57.7 65 -99 SPO 1997 10 07 08 45 78 4.7 -9 689.30 -58.4 -57.3 -57.7 65 -99 SPO 1997 10 07 08 46 77 4.6 -9 689.20 -58.5 -57.4 -57.7 65 -99 SPO 1997 10 07 08 47 78 4.6 -9 689.30 -58.6 -57.4 -57.8 65 -99 SPO 1997 10 07 08 48 78 4.3 -9 689.30 -58.6 -57.5 -57.8 65 -99 SPO 1997 10 07 08 49 79 4.1 -9 689.30 -58.7 -57.4 -57.8 65 -99 SPO 1997 10 07 08 50 78 3.9 -9 689.30 -58.8 -57.4 -57.9 66 -99 SPO 1997 10 07 08 51 80 3.9 -9 689.30 -58.8 -57.4 -57.9 65 -99 SPO 1997 10 07 08 52 79 3.5 -9 689.30 -58.9 -57.4 -57.8 66 -99 SPO 1997 10 07 08 53 79 3.9 -9 689.30 -58.9 -57.4 -57.9 65 -99 SPO 1997 10 07 08 54 79 3.8 -9 689.30 -58.9 -57.2 -57.8 65 -99 SPO 1997 10 07 08 55 80 4.2 -9 689.20 -58.9 -57.2 -57.8 65 -99 SPO 1997 10 07 08 56 80 4.3 -9 689.30 -58.8 -57.2 -57.8 64 -99 SPO 1997 10 07 08 57 81 4.5 -9 689.20 -58.8 -57.3 -57.8 63 -99 SPO 1997 10 07 08 58 80 4.7 -9 689.20 -58.8 -57.2 -57.9 63 -99 SPO 1997 10 07 08 59 80 4.9 -9 689.20 -58.8 -57.2 -57.9 62 -99 SPO 1997 10 07 09 00 80 5.1 -9 689.10 -58.8 -57.2 -57.9 62 0 SPO 1997 10 07 09 01 79 5.2 -9 689.20 -58.8 -57.2 -58.0 63 -99 SPO 1997 10 07 09 02 79 5.2 -9 689.20 -58.9 -57.3 -58.1 64 -99 SPO 1997 10 07 09 03 79 5.6 -9 689.10 -59.0 -57.1 -58.1 65 -99 SPO 1997 10 07 09 04 79 5.8 -9 689.10 -59.0 -56.8 -58.2 65 -99 SPO 1997 10 07 09 05 79 5.8 -9 689.10 -59.1 -56.5 -58.2 65 -99 SPO 1997 10 07 09 06 79 6.0 -9 689.10 -59.1 -56.3 -58.3 65 -99 SPO 1997 10 07 09 07 78 6.2 -9 689.10 -59.0 -56.2 -58.2 65 -99 SPO 1997 10 07 09 08 78 6.5 -9 689.10 -58.8 -55.8 -58.1 63 -99 SPO 1997 10 07 09 09 78 6.8 -9 689.10 -58.6 -55.6 -58.0 62 -99 SPO 1997 10 07 09 10 78 7.0 -9 689.00 -58.6 -55.4 -58.0 62 -99 SPO 1997 10 07 09 11 78 7.2 -9 689.00 -58.4 -55.1 -57.9 60 -99 SPO 1997 10 07 09 12 77 7.6 -9 689.00 -58.3 -55.0 -57.8 60 -99 SPO 1997 10 07 09 13 76 7.7 -9 689.00 -58.2 -54.9 -57.7 60 -99 SPO 1997 10 07 09 14 76 7.8 -9 689.00 -58.1 -55.0 -57.7 60 -99 SPO 1997 10 07 09 15 75 8.0 -9 689.00 -58.1 -55.0 -57.7 60 -99 SPO 1997 10 07 09 16 75 8.0 -9 689.00 -58.1 -54.7 -57.6 62 -99 SPO 1997 10 07 09 17 75 8.2 -9 689.00 -58.0 -54.4 -57.6 62 -99 SPO 1997 10 07 09 18 76 8.2 -9 689.00 -58.0 -54.3 -57.6 63 -99 SPO 1997 10 07 09 19 77 8.0 -9 689.00 -57.9 -54.3 -57.5 64 -99 SPO 1997 10 07 09 20 77 8.0 -9 689.00 -58.0 -54.4 -57.5 66 -99 SPO 1997 10 07 09 21 78 7.8 -9 689.00 -58.0 -54.4 -57.6 66 -99 SPO 1997 10 07 09 22 78 7.6 -9 689.00 -58.1 -54.5 -57.6 66 -99 SPO 1997 10 07 09 23 79 7.5 -9 689.00 -58.0 -54.6 -57.6 65 -99 SPO 1997 10 07 09 24 81 7.4 -9 689.00 -58.0 -54.8 -57.6 65 -99 SPO 1997 10 07 09 25 81 7.3 -9 689.00 -58.0 -54.8 -57.5 66 -99 SPO 1997 10 07 09 26 81 7.3 -9 689.00 -58.0 -55.0 -57.5 66 -99 SPO 1997 10 07 09 27 81 7.2 -9 689.00 -57.9 -55.0 -57.4 65 -99 SPO 1997 10 07 09 28 81 7.2 -9 689.00 -57.9 -55.0 -57.4 66 -99 SPO 1997 10 07 09 29 82 7.2 -9 689.00 -57.8 -55.1 -57.3 66 -99 SPO 1997 10 07 09 30 83 7.1 -9 689.00 -57.8 -55.2 -57.3 66 -99 SPO 1997 10 07 09 31 82 6.9 -9 689.00 -57.8 -55.2 -57.3 67 -99 SPO 1997 10 07 09 32 82 6.8 -9 689.00 -57.9 -55.4 -57.3 67 -99 SPO 1997 10 07 09 33 82 6.5 -9 689.00 -57.9 -55.4 -57.3 67 -99 SPO 1997 10 07 09 34 83 6.4 -9 689.10 -57.9 -55.4 -57.3 67 -99 SPO 1997 10 07 09 35 83 6.3 -9 689.10 -57.9 -55.5 -57.3 67 -99 SPO 1997 10 07 09 36 84 6.1 -9 689.10 -57.9 -55.6 -57.2 67 -99 SPO 1997 10 07 09 37 84 5.9 -9 689.10 -57.8 -55.8 -57.2 67 -99 SPO 1997 10 07 09 38 85 5.5 -9 689.10 -57.8 -55.9 -57.1 67 -99 SPO 1997 10 07 09 39 85 5.4 -9 689.10 -57.8 -56.0 -57.1 67 -99 SPO 1997 10 07 09 40 85 5.2 -9 689.10 -57.9 -56.0 -57.1 68 -99 SPO 1997 10 07 09 41 85 4.8 -9 689.10 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 07 09 42 83 4.5 -9 689.10 -57.9 -56.3 -57.1 67 -99 SPO 1997 10 07 09 43 81 4.5 -9 689.10 -58.0 -56.4 -57.2 68 -99 SPO 1997 10 07 09 44 80 4.2 -9 689.10 -58.0 -56.4 -57.2 67 -99 SPO 1997 10 07 09 45 79 4.0 -9 689.10 -58.0 -56.4 -57.2 66 -99 SPO 1997 10 07 09 46 78 4.0 -9 689.10 -58.1 -56.5 -57.3 66 -99 SPO 1997 10 07 09 47 76 4.0 -9 689.10 -58.1 -56.5 -57.3 66 -99 SPO 1997 10 07 09 48 75 4.0 -9 689.10 -58.1 -56.5 -57.3 67 -99 SPO 1997 10 07 09 49 76 4.0 -9 689.10 -58.1 -56.4 -57.3 67 -99 SPO 1997 10 07 09 50 75 4.3 -9 689.10 -58.2 -56.4 -57.3 68 -99 SPO 1997 10 07 09 51 76 4.4 -9 689.10 -58.2 -56.2 -57.3 68 -99 SPO 1997 10 07 09 52 77 4.5 -9 689.10 -58.2 -56.2 -57.4 68 -99 SPO 1997 10 07 09 53 76 4.8 -9 689.00 -58.1 -56.2 -57.3 67 -99 SPO 1997 10 07 09 54 75 5.0 -9 689.00 -58.1 -56.2 -57.3 67 -99 SPO 1997 10 07 09 55 75 5.2 -9 689.00 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 09 56 75 5.3 -9 689.00 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 09 57 77 5.3 -9 689.00 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 09 58 77 5.2 -9 689.00 -57.9 -56.3 -57.2 65 -99 SPO 1997 10 07 09 59 77 5.4 -9 689.00 -57.9 -56.2 -57.2 65 -99 SPO 1997 10 07 10 00 78 5.3 -9 689.00 -57.9 -56.2 -57.2 65 0 SPO 1997 10 07 10 01 79 5.4 -9 689.00 -57.9 -56.1 -57.2 65 -99 SPO 1997 10 07 10 02 79 5.3 -9 689.00 -58.0 -56.1 -57.3 66 -99 SPO 1997 10 07 10 03 79 5.3 -9 688.90 -58.0 -56.1 -57.3 66 -99 SPO 1997 10 07 10 04 78 5.4 -9 688.90 -58.0 -56.1 -57.3 66 -99 SPO 1997 10 07 10 05 78 5.3 -9 688.90 -58.0 -56.1 -57.3 66 -99 SPO 1997 10 07 10 06 78 5.3 -9 688.90 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 10 07 78 5.3 -9 688.90 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 10 08 78 5.4 -9 689.00 -57.9 -56.2 -57.2 65 -99 SPO 1997 10 07 10 09 79 5.5 -9 688.90 -57.9 -56.3 -57.2 65 -99 SPO 1997 10 07 10 10 79 5.5 -9 688.90 -57.8 -56.2 -57.1 64 -99 SPO 1997 10 07 10 11 79 5.6 -9 688.90 -57.8 -56.2 -57.1 64 -99 SPO 1997 10 07 10 12 79 5.5 -9 688.90 -57.8 -56.2 -57.2 65 -99 SPO 1997 10 07 10 13 78 5.6 -9 688.90 -57.9 -56.2 -57.2 67 -99 SPO 1997 10 07 10 14 77 5.7 -9 688.90 -57.8 -56.2 -57.2 66 -99 SPO 1997 10 07 10 15 75 5.7 -9 688.90 -57.9 -56.2 -57.3 67 -99 SPO 1997 10 07 10 16 73 5.7 -9 688.80 -57.9 -56.2 -57.3 67 -99 SPO 1997 10 07 10 17 72 5.6 -9 688.80 -58.0 -56.3 -57.4 66 -99 SPO 1997 10 07 10 18 72 5.7 -9 688.80 -58.0 -56.3 -57.4 66 -99 SPO 1997 10 07 10 19 72 5.6 -9 688.80 -58.0 -56.4 -57.4 66 -99 SPO 1997 10 07 10 20 70 5.6 -9 688.80 -58.0 -56.5 -57.5 66 -99 SPO 1997 10 07 10 21 68 5.4 -9 688.80 -58.1 -56.5 -57.6 66 -99 SPO 1997 10 07 10 22 66 5.2 -9 688.80 -58.2 -56.5 -57.6 66 -99 SPO 1997 10 07 10 23 64 5.1 -9 688.80 -58.2 -56.5 -57.5 66 -99 SPO 1997 10 07 10 24 63 5.1 -9 688.90 -58.2 -56.5 -57.5 66 -99 SPO 1997 10 07 10 25 62 5.1 -9 688.90 -58.2 -56.4 -57.5 65 -99 SPO 1997 10 07 10 26 60 4.8 -9 688.90 -58.1 -56.5 -57.4 64 -99 SPO 1997 10 07 10 27 58 4.3 -9 688.90 -58.1 -56.6 -57.3 66 -99 SPO 1997 10 07 10 28 55 3.8 -9 688.90 -58.2 -56.8 -57.3 66 -99 SPO 1997 10 07 10 29 51 3.4 -9 688.90 -58.2 -57.0 -57.2 66 -99 SPO 1997 10 07 10 30 47 3.1 -9 689.00 -58.2 -57.2 -57.2 67 -99 SPO 1997 10 07 10 31 47 2.9 -9 689.00 -58.2 -57.2 -57.1 66 -99 SPO 1997 10 07 10 32 49 2.8 -9 689.00 -58.2 -57.2 -57.1 66 -99 SPO 1997 10 07 10 33 50 2.9 -9 689.00 -58.2 -57.2 -57.1 64 -99 SPO 1997 10 07 10 34 51 3.0 -9 689.00 -58.2 -57.1 -57.1 64 -99 SPO 1997 10 07 10 35 51 2.9 -9 689.00 -58.2 -57.1 -57.1 65 -99 SPO 1997 10 07 10 36 52 2.8 -9 689.00 -58.2 -57.0 -57.1 66 -99 SPO 1997 10 07 10 37 57 3.1 -9 689.00 -58.1 -56.9 -57.0 66 -99 SPO 1997 10 07 10 38 60 3.4 -9 689.00 -58.1 -56.8 -57.0 66 -99 SPO 1997 10 07 10 39 64 3.6 -9 688.90 -58.0 -56.7 -57.0 66 -99 SPO 1997 10 07 10 40 63 3.7 -9 689.00 -58.0 -56.6 -57.1 66 -99 SPO 1997 10 07 10 41 64 3.9 -9 689.00 -58.0 -56.6 -57.1 67 -99 SPO 1997 10 07 10 42 67 4.0 -9 688.90 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 07 10 43 69 3.9 -9 689.00 -57.9 -56.5 -57.1 67 -99 SPO 1997 10 07 10 44 69 4.0 -9 688.90 -58.0 -56.5 -57.2 66 -99 SPO 1997 10 07 10 45 68 4.2 -9 688.90 -57.9 -56.4 -57.1 67 -99 SPO 1997 10 07 10 46 67 4.2 -9 688.90 -57.9 -56.4 -57.1 67 -99 SPO 1997 10 07 10 47 68 4.1 -9 688.90 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 07 10 48 68 4.1 -9 688.90 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 07 10 49 68 4.0 -9 688.90 -57.9 -56.3 -57.1 67 -99 SPO 1997 10 07 10 50 69 3.8 -9 688.90 -57.9 -56.4 -57.1 67 -99 SPO 1997 10 07 10 51 72 3.7 -9 688.90 -57.9 -56.4 -57.1 68 -99 SPO 1997 10 07 10 52 74 3.7 -9 688.90 -57.9 -56.4 -57.1 68 -99 SPO 1997 10 07 10 53 74 3.5 -9 688.90 -57.9 -56.4 -57.0 68 -99 SPO 1997 10 07 10 54 73 3.3 -9 688.90 -57.9 -56.4 -57.0 67 -99 SPO 1997 10 07 10 55 72 3.5 -9 688.90 -58.0 -56.5 -57.0 68 -99 SPO 1997 10 07 10 56 72 3.6 -9 688.90 -57.9 -56.5 -57.0 66 -99 SPO 1997 10 07 10 57 74 3.9 -9 688.90 -57.9 -56.4 -57.0 66 -99 SPO 1997 10 07 10 58 74 4.1 -9 688.90 -57.9 -56.3 -57.0 66 -99 SPO 1997 10 07 10 59 77 4.2 -9 688.80 -57.9 -56.2 -57.0 66 -99 SPO 1997 10 07 11 00 77 4.5 -9 688.80 -57.8 -56.2 -57.0 65 0 SPO 1997 10 07 11 01 77 4.7 -9 688.80 -57.8 -56.2 -57.0 66 -99 SPO 1997 10 07 11 02 77 4.8 -9 688.80 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 07 11 03 76 4.9 -9 688.70 -57.8 -56.2 -57.1 67 -99 SPO 1997 10 07 11 04 74 5.0 -9 688.70 -57.9 -56.1 -57.2 67 -99 SPO 1997 10 07 11 05 74 5.2 -9 688.70 -58.0 -56.0 -57.3 69 -99 SPO 1997 10 07 11 06 73 5.1 -9 688.70 -58.0 -56.0 -57.3 68 -99 SPO 1997 10 07 11 07 74 5.1 -9 688.70 -58.0 -56.1 -57.4 68 -99 SPO 1997 10 07 11 08 74 5.1 -9 688.70 -58.1 -56.3 -57.4 68 -99 SPO 1997 10 07 11 09 72 5.0 -9 688.70 -58.2 -56.4 -57.4 68 -99 SPO 1997 10 07 11 10 71 5.0 -9 688.70 -58.2 -56.5 -57.6 67 -99 SPO 1997 10 07 11 11 69 4.8 -9 688.70 -58.3 -56.5 -57.6 67 -99 SPO 1997 10 07 11 12 69 4.7 -9 688.70 -58.4 -56.6 -57.6 66 -99 SPO 1997 10 07 11 13 68 4.4 -9 688.70 -58.4 -56.6 -57.6 66 -99 SPO 1997 10 07 11 14 69 4.4 -9 688.80 -58.4 -56.6 -57.7 66 -99 SPO 1997 10 07 11 15 70 4.4 -9 688.80 -58.4 -56.6 -57.6 66 -99 SPO 1997 10 07 11 16 71 4.3 -9 688.80 -58.4 -56.7 -57.6 66 -99 SPO 1997 10 07 11 17 69 4.1 -9 688.80 -58.4 -56.8 -57.6 66 -99 SPO 1997 10 07 11 18 66 4.0 -9 688.80 -58.4 -56.9 -57.7 66 -99 SPO 1997 10 07 11 19 68 3.8 -9 688.80 -58.5 -56.9 -57.6 66 -99 SPO 1997 10 07 11 20 69 3.6 -9 688.80 -58.5 -57.0 -57.6 67 -99 SPO 1997 10 07 11 21 69 3.5 -9 688.80 -58.5 -57.0 -57.6 66 -99 SPO 1997 10 07 11 22 66 3.5 -9 688.80 -58.6 -57.0 -57.6 68 -99 SPO 1997 10 07 11 23 69 3.5 -9 688.80 -58.6 -57.0 -57.5 67 -99 SPO 1997 10 07 11 24 67 3.6 -9 688.80 -58.5 -56.9 -57.5 66 -99 SPO 1997 10 07 11 25 67 3.8 -9 688.80 -58.6 -56.9 -57.5 67 -99 SPO 1997 10 07 11 26 69 4.0 -9 688.80 -58.5 -56.8 -57.5 67 -99 SPO 1997 10 07 11 27 68 3.8 -9 688.80 -58.5 -56.7 -57.5 69 -99 SPO 1997 10 07 11 28 68 4.1 -9 688.80 -58.5 -56.6 -57.5 69 -99 SPO 1997 10 07 11 29 69 4.0 -9 688.80 -58.4 -56.5 -57.5 69 -99 SPO 1997 10 07 11 30 68 3.9 -9 688.80 -58.4 -56.6 -57.4 69 -99 SPO 1997 10 07 11 31 68 3.9 -9 688.80 -58.4 -56.6 -57.4 70 -99 SPO 1997 10 07 11 32 68 4.0 -9 688.80 -58.3 -56.6 -57.4 68 -99 SPO 1997 10 07 11 33 71 4.3 -9 688.80 -58.2 -56.5 -57.4 66 -99 SPO 1997 10 07 11 34 72 4.6 -9 688.70 -58.2 -56.3 -57.4 66 -99 SPO 1997 10 07 11 35 72 4.9 -9 688.70 -58.0 -56.2 -57.3 66 -99 SPO 1997 10 07 11 36 73 5.0 -9 688.70 -58.0 -56.1 -57.3 66 -99 SPO 1997 10 07 11 37 73 5.1 -9 688.70 -58.0 -56.1 -57.2 66 -99 SPO 1997 10 07 11 38 73 5.0 -9 688.70 -57.8 -56.1 -57.2 66 -99 SPO 1997 10 07 11 39 73 5.2 -9 688.70 -57.8 -56.1 -57.2 67 -99 SPO 1997 10 07 11 40 76 5.5 -9 688.60 -57.7 -56.0 -57.1 67 -99 SPO 1997 10 07 11 41 76 5.7 -9 688.60 -57.8 -56.0 -57.1 67 -99 SPO 1997 10 07 11 42 75 5.5 -9 688.60 -57.8 -55.9 -57.2 67 -99 SPO 1997 10 07 11 43 76 5.6 -9 688.60 -57.9 -55.9 -57.2 67 -99 SPO 1997 10 07 11 44 78 5.6 -9 688.60 -57.9 -56.0 -57.3 68 -99 SPO 1997 10 07 11 45 79 5.4 -9 688.60 -58.0 -56.0 -57.3 69 -99 SPO 1997 10 07 11 46 79 5.2 -9 688.60 -58.0 -56.0 -57.3 68 -99 SPO 1997 10 07 11 47 78 5.1 -9 688.70 -58.1 -56.0 -57.4 69 -99 SPO 1997 10 07 11 48 78 5.0 -9 688.70 -58.2 -56.2 -57.4 69 -99 SPO 1997 10 07 11 49 79 4.7 -9 688.70 -58.2 -56.2 -57.4 68 -99 SPO 1997 10 07 11 50 79 4.6 -9 688.70 -58.2 -56.3 -57.4 68 -99 SPO 1997 10 07 11 51 81 4.5 -9 688.70 -58.2 -56.3 -57.3 68 -99 SPO 1997 10 07 11 52 81 4.4 -9 688.70 -58.2 -56.3 -57.3 68 -99 SPO 1997 10 07 11 53 79 4.2 -9 688.70 -58.3 -56.4 -57.4 68 -99 SPO 1997 10 07 11 54 81 4.3 -9 688.70 -58.3 -56.4 -57.3 69 -99 SPO 1997 10 07 11 55 81 4.2 -9 688.70 -58.4 -56.4 -57.3 69 -99 SPO 1997 10 07 11 56 80 4.2 -9 688.70 -58.3 -56.5 -57.3 68 -99 SPO 1997 10 07 11 57 81 4.1 -9 688.70 -58.3 -56.4 -57.2 68 -99 SPO 1997 10 07 11 58 80 4.0 -9 688.70 -58.3 -56.5 -57.2 67 -99 SPO 1997 10 07 11 59 81 4.0 -9 688.70 -58.3 -56.5 -57.2 66 -99 SPO 1997 10 07 12 00 82 3.9 -9 688.70 -58.3 -56.6 -57.2 66 0 SPO 1997 10 07 12 01 82 3.9 -9 688.70 -58.3 -56.6 -57.2 65 -99 SPO 1997 10 07 12 02 84 3.9 -9 688.70 -58.3 -56.6 -57.2 65 -99 SPO 1997 10 07 12 03 82 4.0 -9 688.70 -58.4 -56.6 -57.2 66 -99 SPO 1997 10 07 12 04 83 4.1 -9 688.70 -58.4 -56.6 -57.3 66 -99 SPO 1997 10 07 12 05 82 4.2 -9 688.70 -58.5 -56.6 -57.4 66 -99 SPO 1997 10 07 12 06 82 4.3 -9 688.70 -58.5 -56.6 -57.4 66 -99 SPO 1997 10 07 12 07 80 4.3 -9 688.70 -58.6 -56.6 -57.5 67 -99 SPO 1997 10 07 12 08 80 4.4 -9 688.70 -58.6 -56.5 -57.5 67 -99 SPO 1997 10 07 12 09 80 4.7 -9 688.70 -58.6 -56.5 -57.6 67 -99 SPO 1997 10 07 12 10 79 5.0 -9 688.70 -58.6 -56.3 -57.7 66 -99 SPO 1997 10 07 12 11 79 5.3 -9 688.70 -58.7 -56.2 -57.7 66 -99 SPO 1997 10 07 12 12 78 5.4 -9 688.70 -58.6 -56.2 -57.8 65 -99 SPO 1997 10 07 12 13 79 5.5 -9 688.70 -58.7 -56.1 -57.8 65 -99 SPO 1997 10 07 12 14 78 5.3 -9 688.70 -58.7 -56.0 -57.9 65 -99 SPO 1997 10 07 12 15 77 5.3 -9 688.70 -58.7 -56.0 -57.9 65 -99 SPO 1997 10 07 12 16 79 5.3 -9 688.70 -58.6 -56.1 -57.9 64 -99 SPO 1997 10 07 12 17 80 5.1 -9 688.70 -58.6 -56.1 -57.9 64 -99 SPO 1997 10 07 12 18 81 4.9 -9 688.70 -58.7 -56.2 -57.9 66 -99 SPO 1997 10 07 12 19 81 4.6 -9 688.70 -58.7 -56.2 -57.8 66 -99 SPO 1997 10 07 12 20 86 4.4 -9 688.70 -58.8 -56.2 -57.9 67 -99 SPO 1997 10 07 12 21 88 4.2 -9 688.70 -58.9 -56.3 -57.9 68 -99 SPO 1997 10 07 12 22 90 4.1 -9 688.70 -59.0 -56.3 -58.0 69 -99 SPO 1997 10 07 12 23 89 4.0 -9 688.70 -59.0 -56.3 -58.0 67 -99 SPO 1997 10 07 12 24 91 3.9 -9 688.70 -59.1 -56.4 -58.0 68 -99 SPO 1997 10 07 12 25 92 4.0 -9 688.70 -59.1 -56.4 -58.1 67 -99 SPO 1997 10 07 12 26 94 4.2 -9 688.70 -59.1 -56.4 -58.1 66 -99 SPO 1997 10 07 12 27 93 4.5 -9 688.70 -59.1 -56.4 -58.1 66 -99 SPO 1997 10 07 12 28 92 4.4 -9 688.70 -59.0 -56.4 -58.0 65 -99 SPO 1997 10 07 12 29 90 4.2 -9 688.70 -59.0 -56.3 -58.0 65 -99 SPO 1997 10 07 12 30 90 4.2 -9 688.60 -58.9 -56.3 -58.0 65 -99 SPO 1997 10 07 12 31 91 4.2 -9 688.60 -58.9 -56.4 -58.0 65 -99 SPO 1997 10 07 12 32 91 4.3 -9 688.60 -58.9 -56.4 -58.1 66 -99 SPO 1997 10 07 12 33 88 4.3 -9 688.60 -58.8 -56.5 -58.0 65 -99 SPO 1997 10 07 12 34 84 4.2 -9 688.60 -58.8 -56.5 -58.0 65 -99 SPO 1997 10 07 12 35 84 4.3 -9 688.70 -58.6 -56.6 -57.9 64 -99 SPO 1997 10 07 12 36 83 4.4 -9 688.70 -58.6 -56.6 -58.0 65 -99 SPO 1997 10 07 12 37 83 4.5 -9 688.70 -58.6 -56.6 -58.0 66 -99 SPO 1997 10 07 12 38 81 4.5 -9 688.70 -58.6 -56.6 -58.0 66 -99 SPO 1997 10 07 12 39 80 4.4 -9 688.70 -58.7 -56.5 -58.1 67 -99 SPO 1997 10 07 12 40 80 4.5 -9 688.70 -58.8 -56.4 -58.2 68 -99 SPO 1997 10 07 12 41 80 4.5 -9 688.70 -59.0 -56.2 -58.2 70 -99 SPO 1997 10 07 12 42 79 4.7 -9 688.70 -59.0 -56.1 -58.3 70 -99 SPO 1997 10 07 12 43 79 4.8 -9 688.70 -59.0 -56.1 -58.4 70 -99 SPO 1997 10 07 12 44 81 4.9 -9 688.70 -59.0 -56.0 -58.4 69 -99 SPO 1997 10 07 12 45 81 4.9 -9 688.70 -59.0 -56.1 -58.3 68 -99 SPO 1997 10 07 12 46 81 5.0 -9 688.70 -59.0 -56.2 -58.3 68 -99 SPO 1997 10 07 12 47 83 5.1 -9 688.60 -58.9 -56.2 -58.3 66 -99 SPO 1997 10 07 12 48 84 5.1 -9 688.60 -58.9 -56.1 -58.2 65 -99 SPO 1997 10 07 12 49 82 4.9 -9 688.60 -58.9 -56.0 -58.2 65 -99 SPO 1997 10 07 12 50 81 4.9 -9 688.60 -58.9 -56.0 -58.3 65 -99 SPO 1997 10 07 12 51 80 4.8 -9 688.60 -58.9 -56.0 -58.3 65 -99 SPO 1997 10 07 12 52 81 4.9 -9 688.60 -58.9 -56.0 -58.3 65 -99 SPO 1997 10 07 12 53 82 5.0 -9 688.60 -58.9 -55.9 -58.3 66 -99 SPO 1997 10 07 12 54 83 5.1 -9 688.60 -58.9 -55.9 -58.3 66 -99 SPO 1997 10 07 12 55 82 5.2 -9 688.50 -59.0 -55.9 -58.3 67 -99 SPO 1997 10 07 12 56 83 5.3 -9 688.50 -59.0 -55.9 -58.4 67 -99 SPO 1997 10 07 12 57 82 5.2 -9 688.50 -59.0 -55.9 -58.4 67 -99 SPO 1997 10 07 12 58 83 5.3 -9 688.50 -59.0 -55.9 -58.4 67 -99 SPO 1997 10 07 12 59 83 5.2 -9 688.50 -59.1 -55.9 -58.4 67 -99 SPO 1997 10 07 13 00 84 5.2 -9 688.50 -59.0 -55.8 -58.4 66 0 SPO 1997 10 07 13 01 84 5.0 -9 688.50 -58.9 -55.8 -58.3 65 -99 SPO 1997 10 07 13 02 85 5.0 -9 688.50 -58.9 -55.8 -58.3 65 -99 SPO 1997 10 07 13 03 85 4.9 -9 688.50 -58.9 -55.7 -58.3 65 -99 SPO 1997 10 07 13 04 86 4.8 -9 688.50 -58.8 -55.7 -58.3 65 -99 SPO 1997 10 07 13 05 86 4.8 -9 688.50 -58.8 -55.8 -58.2 65 -99 SPO 1997 10 07 13 06 84 4.7 -9 688.50 -58.8 -55.8 -58.2 65 -99 SPO 1997 10 07 13 07 85 4.7 -9 688.50 -58.8 -55.8 -58.2 66 -99 SPO 1997 10 07 13 08 85 4.6 -9 688.50 -58.8 -55.9 -58.1 65 -99 SPO 1997 10 07 13 09 86 4.5 -9 688.50 -58.7 -56.0 -58.1 64 -99 SPO 1997 10 07 13 10 87 4.4 -9 688.50 -58.7 -56.0 -58.1 65 -99 SPO 1997 10 07 13 11 86 4.2 -9 688.50 -58.7 -56.1 -58.1 65 -99 SPO 1997 10 07 13 12 88 4.2 -9 688.50 -58.8 -56.2 -58.1 66 -99 SPO 1997 10 07 13 13 88 4.0 -9 688.50 -58.7 -56.2 -58.1 65 -99 SPO 1997 10 07 13 14 90 4.2 -9 688.50 -58.8 -56.2 -58.1 65 -99 SPO 1997 10 07 13 15 90 4.1 -9 688.50 -58.8 -56.3 -58.1 65 -99 SPO 1997 10 07 13 16 90 4.1 -9 688.50 -58.8 -56.3 -58.1 65 -99 SPO 1997 10 07 13 17 92 4.2 -9 688.50 -58.8 -56.3 -58.0 65 -99 SPO 1997 10 07 13 18 92 4.3 -9 688.50 -58.8 -56.2 -58.1 65 -99 SPO 1997 10 07 13 19 92 4.4 -9 688.50 -58.8 -56.2 -58.1 65 -99 SPO 1997 10 07 13 20 92 4.7 -9 688.50 -58.8 -56.1 -58.1 65 -99 SPO 1997 10 07 13 21 91 4.7 -9 688.50 -58.8 -56.0 -58.1 65 -99 SPO 1997 10 07 13 22 90 4.8 -9 688.50 -58.8 -56.0 -58.2 65 -99 SPO 1997 10 07 13 23 92 5.0 -9 688.40 -58.9 -56.0 -58.2 65 -99 SPO 1997 10 07 13 24 94 4.9 -9 688.40 -59.0 -56.0 -58.2 66 -99 SPO 1997 10 07 13 25 94 5.0 -9 688.40 -59.2 -56.0 -58.4 67 -99 SPO 1997 10 07 13 26 94 5.1 -9 688.40 -59.3 -56.0 -58.5 66 -99 SPO 1997 10 07 13 27 94 5.1 -9 688.40 -59.4 -56.0 -58.6 66 -99 SPO 1997 10 07 13 28 92 5.3 -9 688.30 -59.5 -56.1 -58.6 66 -99 SPO 1997 10 07 13 29 91 5.3 -9 688.30 -59.6 -56.1 -58.7 65 -99 SPO 1997 10 07 13 30 91 5.4 -9 688.30 -59.6 -56.0 -58.7 65 -99 SPO 1997 10 07 13 31 92 5.5 -9 688.30 -59.6 -55.9 -58.7 64 -99 SPO 1997 10 07 13 32 92 5.5 -9 688.30 -59.4 -55.9 -58.7 62 -99 SPO 1997 10 07 13 33 94 5.4 -9 688.30 -59.4 -55.9 -58.7 62 -99 SPO 1997 10 07 13 34 96 5.4 -9 688.30 -59.4 -55.9 -58.6 62 -99 SPO 1997 10 07 13 35 97 5.5 -9 688.30 -59.3 -55.9 -58.6 62 -99 SPO 1997 10 07 13 36 98 5.4 -9 688.30 -59.3 -56.0 -58.6 62 -99 SPO 1997 10 07 13 37 99 5.3 -9 688.30 -59.2 -55.9 -58.6 62 -99 SPO 1997 10 07 13 38 100 5.2 -9 688.30 -59.2 -55.8 -58.5 62 -99 SPO 1997 10 07 13 39 101 5.2 -9 688.30 -59.2 -55.8 -58.5 62 -99 SPO 1997 10 07 13 40 102 4.8 -9 688.30 -59.2 -55.8 -58.6 62 -99 SPO 1997 10 07 13 41 105 4.3 -9 688.30 -59.2 -56.0 -58.5 63 -99 SPO 1997 10 07 13 42 109 3.6 -9 688.30 -59.3 -56.2 -58.5 64 -99 SPO 1997 10 07 13 43 111 3.2 -9 688.40 -59.2 -56.3 -58.4 63 -99 SPO 1997 10 07 13 44 110 3.3 -9 688.40 -59.0 -56.4 -58.2 61 -99 SPO 1997 10 07 13 45 107 3.3 -9 688.40 -59.0 -56.5 -58.1 63 -99 SPO 1997 10 07 13 46 104 3.4 -9 688.40 -58.9 -56.5 -57.9 63 -99 SPO 1997 10 07 13 47 101 3.8 -9 688.40 -58.8 -56.4 -57.7 64 -99 SPO 1997 10 07 13 48 100 4.4 -9 688.30 -58.7 -56.3 -57.7 64 -99 SPO 1997 10 07 13 49 100 4.6 -9 688.30 -58.5 -56.2 -57.7 63 -99 SPO 1997 10 07 13 50 100 4.5 -9 688.30 -58.5 -56.3 -57.7 64 -99 SPO 1997 10 07 13 51 100 4.3 -9 688.30 -58.5 -56.3 -57.6 64 -99 SPO 1997 10 07 13 52 100 4.2 -9 688.30 -58.4 -56.2 -57.6 63 -99 SPO 1997 10 07 13 53 100 4.2 -9 688.30 -58.5 -56.1 -57.6 64 -99 SPO 1997 10 07 13 54 100 4.1 -9 688.20 -58.6 -56.1 -57.5 66 -99 SPO 1997 10 07 13 55 98 4.0 -9 688.20 -58.6 -56.2 -57.5 66 -99 SPO 1997 10 07 13 56 97 3.8 -9 688.20 -58.7 -56.1 -57.4 66 -99 SPO 1997 10 07 13 57 96 3.7 -9 688.20 -58.6 -56.1 -57.4 65 -99 SPO 1997 10 07 13 58 96 3.8 -9 688.20 -58.6 -56.0 -57.4 65 -99 SPO 1997 10 07 13 59 96 3.6 -9 688.20 -58.6 -56.0 -57.3 64 -99 SPO 1997 10 07 14 00 97 3.6 -9 688.20 -58.6 -55.9 -57.3 64 0 SPO 1997 10 07 14 01 95 3.6 -9 688.20 -58.5 -55.9 -57.3 63 -99 SPO 1997 10 07 14 02 96 3.6 -9 688.20 -58.5 -55.9 -57.2 63 -99 SPO 1997 10 07 14 03 96 3.5 -9 688.20 -58.4 -55.9 -57.2 62 -99 SPO 1997 10 07 14 04 97 3.2 -9 688.20 -58.4 -55.9 -57.2 63 -99 SPO 1997 10 07 14 05 95 3.1 -9 688.20 -58.4 -56.0 -57.2 63 -99 SPO 1997 10 07 14 06 94 3.0 -9 688.30 -58.4 -56.0 -57.1 63 -99 SPO 1997 10 07 14 07 94 3.0 -9 688.30 -58.4 -56.1 -57.0 63 -99 SPO 1997 10 07 14 08 96 3.3 -9 688.30 -58.4 -56.1 -57.0 64 -99 SPO 1997 10 07 14 09 99 3.4 -9 688.30 -58.3 -56.1 -57.1 64 -99 SPO 1997 10 07 14 10 100 3.4 -9 688.30 -58.4 -56.1 -57.2 65 -99 SPO 1997 10 07 14 11 100 3.6 -9 688.30 -58.4 -56.0 -57.2 65 -99 SPO 1997 10 07 14 12 98 3.7 -9 688.30 -58.4 -56.2 -57.2 65 -99 SPO 1997 10 07 14 13 98 4.1 -9 688.20 -58.4 -56.2 -57.2 64 -99 SPO 1997 10 07 14 14 98 4.3 -9 688.20 -58.4 -56.2 -57.3 65 -99 SPO 1997 10 07 14 15 98 4.5 -9 688.20 -58.5 -56.2 -57.3 65 -99 SPO 1997 10 07 14 16 96 4.6 -9 688.20 -58.6 -56.2 -57.4 65 -99 SPO 1997 10 07 14 17 95 4.5 -9 688.20 -58.6 -56.2 -57.4 64 -99 SPO 1997 10 07 14 18 96 4.5 -9 688.20 -58.7 -56.2 -57.5 64 -99 SPO 1997 10 07 14 19 97 4.5 -9 688.10 -58.8 -56.3 -57.6 64 -99 SPO 1997 10 07 14 20 98 4.5 -9 688.10 -58.8 -56.4 -57.6 63 -99 SPO 1997 10 07 14 21 100 4.4 -9 688.10 -58.9 -56.3 -57.8 64 -99 SPO 1997 10 07 14 22 101 4.0 -9 688.20 -59.1 -56.4 -57.9 65 -99 SPO 1997 10 07 14 23 102 3.5 -9 688.20 -59.4 -56.4 -58.2 67 -99 SPO 1997 10 07 14 24 100 3.6 -9 688.20 -59.7 -56.4 -58.4 69 -99 SPO 1997 10 07 14 25 100 3.7 -9 688.20 -59.8 -56.4 -58.4 68 -99 SPO 1997 10 07 14 26 98 3.5 -9 688.20 -59.9 -56.4 -58.4 66 -99 SPO 1997 10 07 14 27 98 3.4 -9 688.20 -60.0 -56.4 -58.3 66 -99 SPO 1997 10 07 14 28 98 3.2 -9 688.20 -59.9 -56.3 -58.4 64 -99 SPO 1997 10 07 14 29 100 3.0 -9 688.20 -60.0 -56.4 -58.4 64 -99 SPO 1997 10 07 14 30 98 3.1 -9 688.20 -60.0 -56.4 -58.5 63 -99 SPO 1997 10 07 14 31 98 3.3 -9 688.20 -60.1 -56.4 -58.5 64 -99 SPO 1997 10 07 14 32 98 3.7 -9 688.20 -59.9 -56.4 -58.6 61 -99 SPO 1997 10 07 14 33 98 3.8 -9 688.20 -60.0 -56.3 -58.7 62 -99 SPO 1997 10 07 14 34 96 3.9 -9 688.20 -60.0 -56.2 -58.8 62 -99 SPO 1997 10 07 14 35 95 3.9 -9 688.20 -60.0 -56.2 -58.7 61 -99 SPO 1997 10 07 14 36 93 3.9 -9 688.20 -60.0 -56.1 -58.6 61 -99 SPO 1997 10 07 14 37 91 3.9 -9 688.20 -60.0 -56.2 -58.6 60 -99 SPO 1997 10 07 14 38 90 3.8 -9 688.20 -60.1 -56.3 -58.6 61 -99 SPO 1997 10 07 14 39 89 4.0 -9 688.20 -60.2 -56.4 -58.6 62 -99 SPO 1997 10 07 14 40 90 4.2 -9 688.10 -60.3 -56.3 -58.8 63 -99 SPO 1997 10 07 14 41 90 4.1 -9 688.10 -60.4 -56.2 -59.0 63 -99 SPO 1997 10 07 14 42 89 3.9 -9 688.10 -60.6 -56.0 -59.1 63 -99 SPO 1997 10 07 14 43 89 4.0 -9 688.10 -60.7 -56.0 -59.1 63 -99 SPO 1997 10 07 14 44 91 4.1 -9 688.10 -60.7 -56.1 -59.2 63 -99 SPO 1997 10 07 14 45 94 4.2 -9 688.10 -60.8 -56.1 -59.4 63 -99 SPO 1997 10 07 14 46 94 4.0 -9 688.10 -60.8 -56.1 -59.6 63 -99 SPO 1997 10 07 14 47 94 3.8 -9 688.10 -61.1 -56.0 -59.9 64 -99 SPO 1997 10 07 14 48 95 3.7 -9 688.10 -61.0 -56.0 -60.0 63 -99 SPO 1997 10 07 14 49 93 3.8 -9 688.10 -60.9 -56.0 -59.8 61 -99 SPO 1997 10 07 14 50 95 4.2 -9 688.10 -60.8 -55.9 -59.7 60 -99 SPO 1997 10 07 14 51 94 4.1 -9 688.10 -60.8 -55.8 -59.7 61 -99 SPO 1997 10 07 14 52 94 4.2 -9 688.10 -60.8 -55.7 -59.8 61 -99 SPO 1997 10 07 14 53 95 4.0 -9 688.10 -61.0 -55.8 -59.9 62 -99 SPO 1997 10 07 14 54 96 3.9 -9 688.10 -60.9 -55.8 -59.9 59 -99 SPO 1997 10 07 14 55 95 3.5 -9 688.10 -61.0 -55.8 -59.9 60 -99 SPO 1997 10 07 14 56 95 3.5 -9 688.10 -61.0 -56.0 -59.9 60 -99 SPO 1997 10 07 14 57 95 3.7 -9 688.10 -60.9 -55.9 -59.9 59 -99 SPO 1997 10 07 14 58 93 4.0 -9 688.10 -61.0 -55.9 -59.9 61 -99 SPO 1997 10 07 14 59 91 4.3 -9 688.10 -60.8 -55.8 -59.8 59 -99 SPO 1997 10 07 15 00 92 4.5 -9 688.10 -60.6 -55.9 -59.6 59 0 SPO 1997 10 07 15 01 92 4.8 -9 688.10 -60.2 -55.9 -59.2 57 -99 SPO 1997 10 07 15 02 93 5.0 -9 688.10 -59.9 -55.8 -58.8 55 -99 SPO 1997 10 07 15 03 93 5.1 -9 688.10 -59.6 -55.8 -58.5 55 -99 SPO 1997 10 07 15 04 91 5.0 -9 688.10 -59.5 -55.8 -58.4 57 -99 SPO 1997 10 07 15 05 92 5.0 -9 688.10 -59.5 -55.8 -58.4 57 -99 SPO 1997 10 07 15 06 92 5.1 -9 688.10 -59.5 -55.6 -58.5 58 -99 SPO 1997 10 07 15 07 92 5.2 -9 688.10 -59.4 -55.5 -58.5 58 -99 SPO 1997 10 07 15 08 93 5.3 -9 688.10 -59.3 -55.5 -58.5 59 -99 SPO 1997 10 07 15 09 94 5.2 -9 688.10 -59.3 -55.5 -58.5 60 -99 SPO 1997 10 07 15 10 96 4.9 -9 688.10 -59.5 -55.4 -58.7 63 -99 SPO 1997 10 07 15 11 96 4.7 -9 688.10 -60.2 -55.5 -59.4 69 -99 SPO 1997 10 07 15 12 97 4.8 -9 688.10 -60.6 -55.6 -59.8 70 -99 SPO 1997 10 07 15 13 98 4.6 -9 688.10 -60.6 -55.6 -59.7 68 -99 SPO 1997 10 07 15 14 97 4.5 -9 688.10 -60.4 -55.6 -59.5 65 -99 SPO 1997 10 07 15 15 99 4.4 -9 688.00 -60.3 -55.6 -59.4 64 -99 SPO 1997 10 07 15 16 99 4.4 -9 688.00 -60.5 -55.6 -59.6 65 -99 SPO 1997 10 07 15 17 99 4.3 -9 688.00 -60.6 -55.6 -59.7 65 -99 SPO 1997 10 07 15 18 99 4.3 -9 688.00 -60.4 -55.6 -59.6 62 -99 SPO 1997 10 07 15 19 99 4.4 -9 688.00 -60.3 -55.5 -59.4 61 -99 SPO 1997 10 07 15 20 99 4.2 -9 688.00 -60.3 -55.5 -59.4 61 -99 SPO 1997 10 07 15 21 100 4.2 -9 688.00 -60.3 -55.4 -59.4 61 -99 SPO 1997 10 07 15 22 100 4.1 -9 688.00 -60.2 -55.4 -59.4 61 -99 SPO 1997 10 07 15 23 100 4.2 -9 688.00 -60.1 -55.4 -59.3 60 -99 SPO 1997 10 07 15 24 98 4.6 -9 688.00 -60.0 -55.3 -59.2 60 -99 SPO 1997 10 07 15 25 96 4.6 -9 687.90 -60.0 -55.4 -59.2 60 -99 SPO 1997 10 07 15 26 93 4.8 -9 687.90 -59.9 -55.4 -59.0 60 -99 SPO 1997 10 07 15 27 93 4.9 -9 687.90 -59.4 -55.6 -58.6 57 -99 SPO 1997 10 07 15 28 93 5.1 -9 687.90 -59.3 -55.6 -58.4 57 -99 SPO 1997 10 07 15 29 91 5.2 -9 687.90 -59.1 -55.6 -58.3 57 -99 SPO 1997 10 07 15 30 94 5.3 -9 687.90 -59.0 -55.7 -58.2 58 -99 SPO 1997 10 07 15 31 95 5.3 -9 687.90 -58.8 -55.7 -58.0 57 -99 SPO 1997 10 07 15 32 96 5.5 -9 687.80 -58.8 -55.7 -58.0 58 -99 SPO 1997 10 07 15 33 98 5.5 -9 687.80 -58.8 -55.8 -58.1 59 -99 SPO 1997 10 07 15 34 98 5.4 -9 687.80 -58.9 -55.8 -58.2 61 -99 SPO 1997 10 07 15 35 98 5.3 -9 687.80 -59.1 -55.8 -58.3 63 -99 SPO 1997 10 07 15 36 98 5.2 -9 687.80 -59.2 -56.0 -58.4 64 -99 SPO 1997 10 07 15 37 98 5.3 -9 687.80 -59.3 -55.9 -58.5 65 -99 SPO 1997 10 07 15 38 98 5.2 -9 687.80 -59.4 -55.9 -58.6 65 -99 SPO 1997 10 07 15 39 96 5.2 -9 687.80 -59.4 -56.0 -58.5 65 -99 SPO 1997 10 07 15 40 98 5.1 -9 687.80 -59.3 -56.0 -58.5 64 -99 SPO 1997 10 07 15 41 100 5.1 -9 687.80 -59.4 -56.0 -58.6 64 -99 SPO 1997 10 07 15 42 99 5.0 -9 687.80 -59.5 -56.0 -58.8 63 -99 SPO 1997 10 07 15 43 99 5.0 -9 687.80 -59.6 -56.0 -58.9 63 -99 SPO 1997 10 07 15 44 99 5.0 -9 687.80 -59.8 -56.2 -59.0 64 -99 SPO 1997 10 07 15 45 98 4.8 -9 687.80 -59.9 -56.3 -59.1 64 -99 SPO 1997 10 07 15 46 98 4.9 -9 687.80 -60.0 -56.3 -59.2 65 -99 SPO 1997 10 07 15 47 97 5.0 -9 687.80 -60.0 -56.3 -59.2 65 -99 SPO 1997 10 07 15 48 96 5.1 -9 687.80 -59.8 -56.2 -59.0 64 -99 SPO 1997 10 07 15 49 95 5.1 -9 687.80 -59.7 -56.2 -58.9 62 -99 SPO 1997 10 07 15 50 95 5.2 -9 687.80 -59.7 -56.2 -58.8 63 -99 SPO 1997 10 07 15 51 96 5.3 -9 687.70 -59.7 -56.2 -58.9 63 -99 SPO 1997 10 07 15 52 95 5.1 -9 687.70 -59.7 -56.2 -58.9 62 -99 SPO 1997 10 07 15 53 94 5.1 -9 687.70 -59.8 -56.4 -59.0 62 -99 SPO 1997 10 07 15 54 94 4.9 -9 687.80 -60.0 -56.4 -59.1 63 -99 SPO 1997 10 07 15 55 95 4.8 -9 687.80 -60.2 -56.4 -59.2 64 -99 SPO 1997 10 07 15 56 98 5.1 -9 687.70 -60.3 -56.2 -59.4 63 -99 SPO 1997 10 07 15 57 97 5.2 -9 687.70 -60.3 -56.2 -59.5 63 -99 SPO 1997 10 07 15 58 93 5.3 -9 687.70 -60.2 -56.0 -59.4 61 -99 SPO 1997 10 07 15 59 92 5.2 -9 687.70 -60.0 -55.7 -59.2 60 -99 SPO 1997 10 07 16 00 97 5.3 -9 687.70 -59.8 -55.6 -59.0 59 0 SPO 1997 10 07 16 01 94 5.3 -9 687.70 -59.8 -55.8 -59.0 59 -99 SPO 1997 10 07 16 02 96 5.3 -9 687.70 -59.8 -55.9 -59.0 60 -99 SPO 1997 10 07 16 03 96 5.2 -9 687.70 -59.9 -55.8 -59.1 61 -99 SPO 1997 10 07 16 04 95 5.3 -9 687.70 -59.8 -55.7 -59.0 60 -99 SPO 1997 10 07 16 05 97 5.4 -9 687.70 -59.8 -55.6 -59.0 60 -99 SPO 1997 10 07 16 06 96 5.3 -9 687.70 -60.0 -55.8 -59.2 61 -99 SPO 1997 10 07 16 07 94 5.1 -9 687.70 -60.1 -55.9 -59.2 62 -99 SPO 1997 10 07 16 08 93 5.4 -9 687.70 -60.2 -55.8 -59.3 63 -99 SPO 1997 10 07 16 09 94 5.5 -9 687.70 -60.1 -55.7 -59.2 61 -99 SPO 1997 10 07 16 10 93 5.6 -9 687.70 -60.0 -55.7 -59.2 61 -99 SPO 1997 10 07 16 11 95 5.7 -9 687.70 -59.9 -55.6 -59.2 61 -99 SPO 1997 10 07 16 12 90 5.3 -9 687.70 -59.9 -55.6 -59.1 60 -99 SPO 1997 10 07 16 13 93 5.6 -9 687.70 -59.9 -55.6 -59.1 60 -99 SPO 1997 10 07 16 14 94 5.5 -9 687.70 -59.8 -55.6 -59.0 60 -99 SPO 1997 10 07 16 15 94 5.6 -9 687.70 -59.8 -55.7 -59.0 60 -99 SPO 1997 10 07 16 16 92 5.3 -9 687.70 -59.7 -55.8 -58.9 60 -99 SPO 1997 10 07 16 17 95 5.6 -9 687.70 -59.8 -55.7 -59.0 60 -99 SPO 1997 10 07 16 18 96 5.6 -9 687.60 -60.0 -55.6 -59.1 62 -99 SPO 1997 10 07 16 19 96 5.5 -9 687.60 -60.1 -55.5 -59.2 63 -99 SPO 1997 10 07 16 20 94 5.2 -9 687.60 -60.1 -55.5 -59.3 63 -99 SPO 1997 10 07 16 21 94 5.2 -9 687.70 -60.1 -55.5 -59.2 62 -99 SPO 1997 10 07 16 22 95 5.5 -9 687.70 -59.9 -55.4 -59.1 60 -99 SPO 1997 10 07 16 23 97 5.8 -9 687.60 -59.7 -55.5 -59.0 60 -99 SPO 1997 10 07 16 24 98 5.9 -9 687.60 -59.6 -55.3 -58.8 59 -99 SPO 1997 10 07 16 25 96 5.7 -9 687.60 -59.4 -55.2 -58.7 59 -99 SPO 1997 10 07 16 26 96 5.8 -9 687.60 -59.4 -55.4 -58.7 61 -99 SPO 1997 10 07 16 27 96 5.7 -9 687.60 -59.3 -55.5 -58.6 61 -99 SPO 1997 10 07 16 28 96 5.9 -9 687.60 -59.3 -55.4 -58.6 61 -99 SPO 1997 10 07 16 29 93 6.1 -9 687.60 -59.2 -55.2 -58.5 60 -99 SPO 1997 10 07 16 30 92 5.8 -9 687.60 -59.1 -55.2 -58.4 60 -99 SPO 1997 10 07 16 31 93 5.9 -9 687.60 -59.1 -55.4 -58.4 61 -99 SPO 1997 10 07 16 32 95 6.2 -9 687.60 -59.0 -55.4 -58.3 61 -99 SPO 1997 10 07 16 33 94 6.2 -9 687.60 -58.9 -55.4 -58.3 60 -99 SPO 1997 10 07 16 34 92 6.0 -9 687.60 -58.8 -55.4 -58.2 60 -99 SPO 1997 10 07 16 35 89 5.7 -9 687.60 -58.7 -55.6 -58.1 61 -99 SPO 1997 10 07 16 36 91 5.9 -9 687.60 -58.6 -55.6 -58.0 61 -99 SPO 1997 10 07 16 37 93 6.4 -9 687.60 -58.6 -55.3 -58.0 62 -99 SPO 1997 10 07 16 38 93 6.4 -9 687.50 -58.7 -55.3 -58.1 63 -99 SPO 1997 10 07 16 39 91 6.3 -9 687.60 -58.8 -55.2 -58.1 64 -99 SPO 1997 10 07 16 40 88 6.1 -9 687.60 -58.8 -55.0 -58.1 64 -99 SPO 1997 10 07 16 41 88 6.1 -9 687.60 -58.8 -55.0 -58.1 64 -99 SPO 1997 10 07 16 42 91 6.5 -9 687.60 -58.8 -54.9 -58.1 64 -99 SPO 1997 10 07 16 43 93 6.8 -9 687.50 -58.8 -54.9 -58.2 64 -99 SPO 1997 10 07 16 44 92 6.7 -9 687.50 -58.7 -54.9 -58.1 62 -99 SPO 1997 10 07 16 45 90 6.2 -9 687.60 -58.8 -55.0 -58.1 62 -99 SPO 1997 10 07 16 46 91 6.0 -9 687.60 -58.8 -55.2 -58.1 64 -99 SPO 1997 10 07 16 47 92 6.1 -9 687.60 -58.8 -55.4 -58.1 64 -99 SPO 1997 10 07 16 48 92 6.2 -9 687.60 -58.9 -55.4 -58.2 65 -99 SPO 1997 10 07 16 49 92 6.2 -9 687.60 -59.0 -55.4 -58.2 65 -99 SPO 1997 10 07 16 50 93 6.0 -9 687.60 -59.0 -55.4 -58.2 64 -99 SPO 1997 10 07 16 51 93 5.5 -9 687.60 -58.9 -55.5 -58.2 63 -99 SPO 1997 10 07 16 52 90 5.4 -9 687.60 -58.9 -55.5 -58.2 63 -99 SPO 1997 10 07 16 53 91 5.5 -9 687.60 -58.8 -55.6 -58.0 61 -99 SPO 1997 10 07 16 54 92 5.7 -9 687.60 -58.8 -55.7 -58.0 61 -99 SPO 1997 10 07 16 55 94 5.6 -9 687.60 -58.8 -55.7 -58.0 61 -99 SPO 1997 10 07 16 56 93 5.5 -9 687.60 -58.8 -55.7 -58.0 61 -99 SPO 1997 10 07 16 57 93 5.2 -9 687.60 -58.8 -55.6 -58.0 62 -99 SPO 1997 10 07 16 58 93 5.1 -9 687.60 -58.8 -55.5 -58.0 62 -99 SPO 1997 10 07 16 59 95 5.2 -9 687.60 -58.7 -55.4 -58.0 62 -99 SPO 1997 10 07 17 00 98 5.3 -9 687.60 -58.7 -55.5 -57.9 62 0 SPO 1997 10 07 17 01 100 5.1 -9 687.60 -58.7 -55.6 -58.0 62 -99 SPO 1997 10 07 17 02 103 4.7 -9 687.60 -58.9 -55.8 -58.0 64 -99 SPO 1997 10 07 17 03 102 4.3 -9 687.60 -59.2 -55.9 -58.2 66 -99 SPO 1997 10 07 17 04 104 4.4 -9 687.60 -59.4 -56.0 -58.4 67 -99 SPO 1997 10 07 17 05 104 4.8 -9 687.60 -59.4 -56.0 -58.6 66 -99 SPO 1997 10 07 17 06 105 5.2 -9 687.60 -59.5 -56.0 -58.8 66 -99 SPO 1997 10 07 17 07 102 5.0 -9 687.60 -59.6 -56.1 -58.9 65 -99 SPO 1997 10 07 17 08 101 4.5 -9 687.60 -59.7 -56.2 -58.9 65 -99 SPO 1997 10 07 17 09 99 4.5 -9 687.60 -59.6 -56.3 -58.7 64 -99 SPO 1997 10 07 17 10 101 4.8 -9 687.60 -59.5 -56.2 -58.6 63 -99 SPO 1997 10 07 17 11 102 5.2 -9 687.60 -59.4 -56.1 -58.7 62 -99 SPO 1997 10 07 17 12 100 5.4 -9 687.50 -59.4 -56.0 -58.7 62 -99 SPO 1997 10 07 17 13 98 5.4 -9 687.50 -59.4 -56.0 -58.6 62 -99 SPO 1997 10 07 17 14 96 5.0 -9 687.60 -59.3 -56.0 -58.5 61 -99 SPO 1997 10 07 17 15 96 5.1 -9 687.60 -59.3 -55.9 -58.5 60 -99 SPO 1997 10 07 17 16 -999 -99.9 -9 687.60 -59.3 -55.9 -58.5 60 -99 SPO 1997 10 07 17 17 97 5.0 -9 687.60 -59.4 -56.0 -58.6 61 -99 SPO 1997 10 07 17 18 97 5.0 -9 687.60 -59.5 -56.1 -58.6 62 -99 SPO 1997 10 07 17 19 96 5.0 -9 687.60 -59.5 -56.1 -58.7 61 -99 SPO 1997 10 07 17 20 96 5.2 -9 687.60 -59.5 -56.0 -58.6 62 -99 SPO 1997 10 07 17 21 96 5.1 -9 687.60 -59.5 -55.9 -58.6 63 -99 SPO 1997 10 07 17 22 97 5.2 -9 687.60 -59.5 -55.9 -58.6 63 -99 SPO 1997 10 07 17 23 98 5.3 -9 687.60 -59.5 -55.9 -58.7 63 -99 SPO 1997 10 07 17 24 99 5.1 -9 687.50 -59.6 -55.8 -58.8 64 -99 SPO 1997 10 07 17 25 99 5.1 -9 687.60 -59.6 -55.8 -58.8 64 -99 SPO 1997 10 07 17 26 100 5.0 -9 687.60 -59.7 -55.8 -58.8 64 -99 SPO 1997 10 07 17 27 101 5.0 -9 687.60 -59.7 -55.8 -58.9 64 -99 SPO 1997 10 07 17 28 100 5.3 -9 687.50 -59.7 -55.9 -58.9 63 -99 SPO 1997 10 07 17 29 100 5.6 -9 687.50 -59.7 -55.9 -58.9 62 -99 SPO 1997 10 07 17 30 101 5.9 -9 687.50 -59.7 -56.0 -58.9 62 -99 SPO 1997 10 07 17 31 101 5.6 -9 687.50 -59.7 -56.1 -58.9 62 -99 SPO 1997 10 07 17 32 99 5.4 -9 687.50 -59.7 -56.3 -58.8 63 -99 SPO 1997 10 07 17 33 97 5.5 -9 687.60 -59.7 -56.5 -58.8 64 -99 SPO 1997 10 07 17 34 97 5.6 -9 687.60 -59.6 -56.6 -58.8 64 -99 SPO 1997 10 07 17 35 97 5.7 -9 687.50 -59.6 -56.6 -58.8 64 -99 SPO 1997 10 07 17 36 95 5.8 -9 687.50 -59.6 -56.6 -58.8 64 -99 SPO 1997 10 07 17 37 97 6.2 -9 687.50 -59.6 -56.6 -58.8 64 -99 SPO 1997 10 07 17 38 96 6.3 -9 687.50 -59.7 -56.6 -58.9 65 -99 SPO 1997 10 07 17 39 93 6.2 -9 687.50 -59.6 -56.5 -58.9 64 -99 SPO 1997 10 07 17 40 92 6.2 -9 687.50 -59.6 -56.5 -58.9 64 -99 SPO 1997 10 07 17 41 93 6.6 -9 687.50 -59.6 -56.5 -58.9 64 -99 SPO 1997 10 07 17 42 92 6.2 -9 687.40 -59.6 -56.4 -58.9 63 -99 SPO 1997 10 07 17 43 89 6.0 -9 687.50 -59.6 -56.4 -58.9 63 -99 SPO 1997 10 07 17 44 90 6.5 -9 687.50 -59.6 -56.4 -58.8 64 -99 SPO 1997 10 07 17 45 91 6.7 -9 687.40 -59.5 -56.3 -58.8 63 -99 SPO 1997 10 07 17 46 91 6.6 -9 687.40 -59.6 -56.2 -58.9 64 -99 SPO 1997 10 07 17 47 88 6.4 -9 687.50 -59.5 -56.3 -58.8 63 -99 SPO 1997 10 07 17 48 90 6.4 -9 687.50 -59.6 -56.4 -58.8 64 -99 SPO 1997 10 07 17 49 90 6.5 -9 687.50 -59.6 -56.6 -58.9 64 -99 SPO 1997 10 07 17 50 89 6.2 -9 687.50 -59.6 -56.6 -58.9 64 -99 SPO 1997 10 07 17 51 89 6.2 -9 687.50 -59.6 -56.7 -58.9 64 -99 SPO 1997 10 07 17 52 89 6.4 -9 687.50 -59.7 -56.7 -58.9 64 -99 SPO 1997 10 07 17 53 90 6.5 -9 687.40 -59.7 -56.6 -58.9 64 -99 SPO 1997 10 07 17 54 90 6.8 -9 687.40 -59.7 -56.4 -59.0 64 -99 SPO 1997 10 07 17 55 89 7.0 -9 687.40 -59.8 -56.2 -59.1 64 -99 SPO 1997 10 07 17 56 86 6.9 -9 687.40 -59.8 -56.1 -59.1 64 -99 SPO 1997 10 07 17 57 84 6.7 -9 687.50 -59.8 -56.1 -59.1 64 -99 SPO 1997 10 07 17 58 85 6.7 -9 687.50 -59.8 -56.1 -59.1 64 -99 SPO 1997 10 07 17 59 86 6.8 -9 687.50 -59.8 -56.1 -59.0 64 -99 SPO 1997 10 07 18 00 88 6.8 -9 687.40 -59.8 -56.1 -59.1 64 0 SPO 1997 10 07 18 01 86 6.6 -9 687.40 -59.8 -56.2 -59.1 64 -99 SPO 1997 10 07 18 02 87 6.8 -9 687.40 -59.8 -56.4 -59.1 64 -99 SPO 1997 10 07 18 03 87 6.9 -9 687.40 -59.9 -56.5 -59.1 64 -99 SPO 1997 10 07 18 04 85 6.6 -9 687.40 -59.9 -56.5 -59.2 63 -99 SPO 1997 10 07 18 05 84 6.7 -9 687.50 -59.9 -56.5 -59.2 63 -99 SPO 1997 10 07 18 06 86 6.8 -9 687.40 -60.0 -56.4 -59.2 64 -99 SPO 1997 10 07 18 07 85 6.7 -9 687.40 -60.0 -56.3 -59.2 64 -99 SPO 1997 10 07 18 08 84 6.5 -9 687.40 -59.9 -56.2 -59.2 64 -99 SPO 1997 10 07 18 09 86 6.5 -9 687.40 -59.9 -56.2 -59.1 64 -99 SPO 1997 10 07 18 10 85 6.4 -9 687.40 -59.9 -56.2 -59.1 64 -99 SPO 1997 10 07 18 11 84 6.2 -9 687.40 -59.8 -56.1 -59.1 64 -99 SPO 1997 10 07 18 12 83 6.0 -9 687.40 -59.8 -56.1 -59.0 64 -99 SPO 1997 10 07 18 13 84 6.2 -9 687.40 -59.8 -56.1 -59.0 64 -99 SPO 1997 10 07 18 14 86 6.7 -9 687.30 -59.9 -56.0 -59.1 64 -99 SPO 1997 10 07 18 15 87 6.8 -9 687.30 -59.9 -56.0 -59.2 64 -99 SPO 1997 10 07 18 16 88 6.7 -9 687.30 -60.0 -55.9 -59.2 64 -99 SPO 1997 10 07 18 17 86 6.4 -9 687.30 -60.0 -56.0 -59.2 64 -99 SPO 1997 10 07 18 18 87 6.3 -9 687.30 -60.0 -56.0 -59.2 64 -99 SPO 1997 10 07 18 19 87 6.2 -9 687.30 -60.0 -56.2 -59.2 64 -99 SPO 1997 10 07 18 20 86 6.0 -9 687.40 -60.1 -56.4 -59.2 65 -99 SPO 1997 10 07 18 21 88 6.1 -9 687.30 -60.0 -56.5 -59.2 64 -99 SPO 1997 10 07 18 22 87 6.0 -9 687.40 -60.1 -56.6 -59.2 66 -99 SPO 1997 10 07 18 23 90 6.1 -9 687.30 -60.1 -56.6 -59.2 66 -99 SPO 1997 10 07 18 24 88 5.9 -9 687.40 -60.1 -56.6 -59.3 66 -99 SPO 1997 10 07 18 25 91 6.0 -9 687.30 -60.1 -56.8 -59.3 67 -99 SPO 1997 10 07 18 26 89 5.9 -9 687.30 -60.1 -57.0 -59.3 66 -99 SPO 1997 10 07 18 27 89 6.0 -9 687.30 -60.0 -57.2 -59.2 64 -99 SPO 1997 10 07 18 28 90 6.0 -9 687.30 -60.0 -57.3 -59.2 64 -99 SPO 1997 10 07 18 29 88 5.8 -9 687.30 -60.0 -57.2 -59.3 63 -99 SPO 1997 10 07 18 30 85 5.7 -9 687.30 -60.0 -57.0 -59.3 63 -99 SPO 1997 10 07 18 31 85 5.8 -9 687.30 -60.0 -56.4 -59.3 64 -99 SPO 1997 10 07 18 32 82 5.6 -9 687.40 -60.0 -56.3 -59.3 64 -99 SPO 1997 10 07 18 33 84 5.7 -9 687.30 -60.1 -56.4 -59.3 64 -99 SPO 1997 10 07 18 34 84 5.9 -9 687.30 -60.1 -56.6 -59.4 64 -99 SPO 1997 10 07 18 35 83 6.1 -9 687.30 -60.2 -56.6 -59.4 64 -99 SPO 1997 10 07 18 36 81 6.1 -9 687.30 -60.2 -56.5 -59.4 64 -99 SPO 1997 10 07 18 37 79 6.4 -9 687.20 -60.1 -56.4 -59.4 63 -99 SPO 1997 10 07 18 38 80 6.6 -9 687.20 -60.2 -56.2 -59.4 64 -99 SPO 1997 10 07 18 39 81 6.7 -9 687.20 -60.2 -56.0 -59.5 63 -99 SPO 1997 10 07 18 40 79 6.5 -9 687.20 -60.2 -56.0 -59.5 63 -99 SPO 1997 10 07 18 41 80 6.6 -9 687.20 -60.2 -56.0 -59.5 63 -99 SPO 1997 10 07 18 42 80 6.5 -9 687.20 -60.2 -56.0 -59.5 63 -99 SPO 1997 10 07 18 43 78 6.4 -9 687.20 -60.2 -56.1 -59.6 64 -99 SPO 1997 10 07 18 44 80 6.6 -9 687.20 -60.2 -56.1 -59.6 64 -99 SPO 1997 10 07 18 45 80 6.7 -9 687.20 -60.3 -56.1 -59.6 64 -99 SPO 1997 10 07 18 46 81 6.8 -9 687.20 -60.3 -56.1 -59.6 64 -99 SPO 1997 10 07 18 47 81 6.7 -9 687.20 -60.3 -56.0 -59.6 64 -99 SPO 1997 10 07 18 48 82 6.7 -9 687.20 -60.3 -55.9 -59.6 64 -99 SPO 1997 10 07 18 49 83 6.8 -9 687.10 -60.3 -55.8 -59.6 63 -99 SPO 1997 10 07 18 50 81 6.5 -9 687.20 -60.2 -55.8 -59.5 62 -99 SPO 1997 10 07 18 51 83 6.5 -9 687.20 -60.1 -56.0 -59.5 61 -99 SPO 1997 10 07 18 52 84 6.6 -9 687.10 -60.1 -56.2 -59.4 62 -99 SPO 1997 10 07 18 53 82 6.5 -9 687.20 -60.0 -56.3 -59.4 61 -99 SPO 1997 10 07 18 54 81 6.4 -9 687.20 -60.0 -56.4 -59.3 62 -99 SPO 1997 10 07 18 55 81 6.4 -9 687.20 -60.0 -56.4 -59.3 63 -99 SPO 1997 10 07 18 56 83 6.5 -9 687.20 -60.0 -56.5 -59.3 64 -99 SPO 1997 10 07 18 57 82 6.5 -9 687.10 -60.0 -56.5 -59.3 64 -99 SPO 1997 10 07 18 58 83 6.5 -9 687.10 -60.0 -56.6 -59.3 64 -99 SPO 1997 10 07 18 59 83 6.4 -9 687.10 -59.9 -56.6 -59.2 63 -99 SPO 1997 10 07 19 00 81 6.2 -9 687.20 -59.9 -56.6 -59.3 63 0 SPO 1997 10 07 19 01 82 6.4 -9 687.20 -59.9 -56.5 -59.3 63 -99 SPO 1997 10 07 19 02 83 6.5 -9 687.10 -60.0 -56.5 -59.3 64 -99 SPO 1997 10 07 19 03 81 6.4 -9 687.10 -60.0 -56.6 -59.3 64 -99 SPO 1997 10 07 19 04 80 6.5 -9 687.10 -60.0 -56.5 -59.3 64 -99 SPO 1997 10 07 19 05 82 6.5 -9 687.00 -60.0 -56.2 -59.3 64 -99 SPO 1997 10 07 19 06 80 6.5 -9 687.10 -60.0 -56.2 -59.3 64 -99 SPO 1997 10 07 19 07 82 6.7 -9 687.10 -60.0 -56.3 -59.3 64 -99 SPO 1997 10 07 19 08 83 6.6 -9 687.00 -60.0 -56.6 -59.3 64 -99 SPO 1997 10 07 19 09 83 6.6 -9 687.00 -60.0 -56.7 -59.3 64 -99 SPO 1997 10 07 19 10 83 6.5 -9 687.00 -60.0 -56.4 -59.3 64 -99 SPO 1997 10 07 19 11 82 6.4 -9 687.00 -59.9 -56.5 -59.2 64 -99 SPO 1997 10 07 19 12 82 6.4 -9 687.00 -59.9 -56.7 -59.2 64 -99 SPO 1997 10 07 19 13 83 6.3 -9 687.00 -59.9 -56.8 -59.2 64 -99 SPO 1997 10 07 19 14 83 6.3 -9 687.00 -59.9 -56.9 -59.2 64 -99 SPO 1997 10 07 19 15 83 6.4 -9 687.00 -59.8 -56.9 -59.2 64 -99 SPO 1997 10 07 19 16 83 6.3 -9 687.00 -59.9 -56.8 -59.2 64 -99 SPO 1997 10 07 19 17 83 6.4 -9 687.00 -60.0 -56.7 -59.3 64 -99 SPO 1997 10 07 19 18 82 6.2 -9 687.00 -60.0 -56.8 -59.3 64 -99 SPO 1997 10 07 19 19 82 6.3 -9 687.00 -60.0 -56.9 -59.3 64 -99 SPO 1997 10 07 19 20 83 6.3 -9 687.00 -60.1 -56.9 -59.3 66 -99 SPO 1997 10 07 19 21 83 6.2 -9 687.00 -60.0 -56.8 -59.3 65 -99 SPO 1997 10 07 19 22 83 6.1 -9 687.00 -60.0 -57.0 -59.3 64 -99 SPO 1997 10 07 19 23 85 6.1 -9 687.00 -60.0 -57.1 -59.3 64 -99 SPO 1997 10 07 19 24 84 5.9 -9 687.00 -60.0 -57.1 -59.3 64 -99 SPO 1997 10 07 19 25 84 6.0 -9 687.10 -60.0 -57.2 -59.3 64 -99 SPO 1997 10 07 19 26 85 6.0 -9 687.00 -60.1 -57.1 -59.4 64 -99 SPO 1997 10 07 19 27 84 6.0 -9 687.00 -60.2 -56.9 -59.4 64 -99 SPO 1997 10 07 19 28 83 6.0 -9 687.00 -60.2 -56.8 -59.4 64 -99 SPO 1997 10 07 19 29 83 6.2 -9 687.00 -60.2 -56.8 -59.5 64 -99 SPO 1997 10 07 19 30 82 6.4 -9 687.00 -60.3 -56.7 -59.5 65 -99 SPO 1997 10 07 19 31 82 6.5 -9 687.00 -60.3 -56.6 -59.5 65 -99 SPO 1997 10 07 19 32 82 6.5 -9 687.00 -60.2 -56.6 -59.4 64 -99 SPO 1997 10 07 19 33 82 6.6 -9 687.00 -60.2 -56.6 -59.4 64 -99 SPO 1997 10 07 19 34 82 6.6 -9 687.00 -60.1 -56.6 -59.4 64 -99 SPO 1997 10 07 19 35 81 6.6 -9 687.00 -60.1 -56.6 -59.4 64 -99 SPO 1997 10 07 19 36 80 6.6 -9 687.00 -60.1 -56.7 -59.4 64 -99 SPO 1997 10 07 19 37 80 6.6 -9 687.00 -60.1 -56.7 -59.4 63 -99 SPO 1997 10 07 19 38 79 6.7 -9 686.90 -60.1 -56.8 -59.4 63 -99 SPO 1997 10 07 19 39 78 6.6 -9 686.90 -60.1 -56.8 -59.4 63 -99 SPO 1997 10 07 19 40 79 6.6 -9 687.00 -60.1 -56.8 -59.4 63 -99 SPO 1997 10 07 19 41 79 6.5 -9 687.00 -60.0 -56.9 -59.3 63 -99 SPO 1997 10 07 19 42 80 6.5 -9 687.00 -59.8 -56.9 -59.2 62 -99 SPO 1997 10 07 19 43 82 6.5 -9 686.90 -59.8 -56.9 -59.1 62 -99 SPO 1997 10 07 19 44 83 6.3 -9 686.90 -59.8 -57.0 -59.1 64 -99 SPO 1997 10 07 19 45 82 6.1 -9 687.00 -59.8 -57.0 -59.1 64 -99 SPO 1997 10 07 19 46 82 6.1 -9 687.00 -59.7 -57.1 -59.1 64 -99 SPO 1997 10 07 19 47 84 6.3 -9 686.90 -59.8 -57.1 -59.1 64 -99 SPO 1997 10 07 19 48 83 6.2 -9 687.00 -59.8 -57.1 -59.1 64 -99 SPO 1997 10 07 19 49 81 6.1 -9 687.00 -59.7 -57.1 -59.1 64 -99 SPO 1997 10 07 19 50 85 6.4 -9 686.90 -59.7 -57.1 -59.0 63 -99 SPO 1997 10 07 19 51 83 6.2 -9 686.90 -59.7 -57.1 -59.0 63 -99 SPO 1997 10 07 19 52 84 6.2 -9 687.00 -59.7 -57.2 -59.0 63 -99 SPO 1997 10 07 19 53 86 6.3 -9 687.00 -59.7 -57.2 -59.0 64 -99 SPO 1997 10 07 19 54 87 6.2 -9 687.00 -59.6 -57.2 -58.9 64 -99 SPO 1997 10 07 19 55 87 6.2 -9 687.00 -59.5 -57.3 -58.9 63 -99 SPO 1997 10 07 19 56 87 6.3 -9 686.90 -59.5 -57.3 -58.8 64 -99 SPO 1997 10 07 19 57 87 6.3 -9 687.00 -59.5 -57.3 -58.8 64 -99 SPO 1997 10 07 19 58 86 6.3 -9 686.90 -59.5 -57.2 -58.9 65 -99 SPO 1997 10 07 19 59 85 6.3 -9 687.00 -59.5 -57.2 -58.9 65 -99 SPO 1997 10 07 20 00 85 6.3 -9 686.90 -59.6 -57.1 -58.9 65 0 SPO 1997 10 07 20 01 85 6.2 -9 686.90 -59.5 -57.2 -58.9 64 -99 SPO 1997 10 07 20 02 85 6.1 -9 687.00 -59.5 -57.2 -58.9 64 -99 SPO 1997 10 07 20 03 85 6.3 -9 686.90 -59.6 -57.2 -58.9 65 -99 SPO 1997 10 07 20 04 85 6.2 -9 687.00 -59.6 -57.2 -58.9 66 -99 SPO 1997 10 07 20 05 85 6.2 -9 686.90 -59.5 -57.2 -58.9 65 -99 SPO 1997 10 07 20 06 86 6.3 -9 686.90 -59.5 -57.2 -58.9 66 -99 SPO 1997 10 07 20 07 87 6.2 -9 686.90 -59.5 -57.1 -58.9 66 -99 SPO 1997 10 07 20 08 88 6.2 -9 686.90 -59.5 -57.2 -58.9 66 -99 SPO 1997 10 07 20 09 88 6.2 -9 687.00 -59.4 -57.2 -58.8 65 -99 SPO 1997 10 07 20 10 89 6.2 -9 687.00 -59.4 -57.2 -58.8 65 -99 SPO 1997 10 07 20 11 90 6.1 -9 687.00 -59.4 -57.4 -58.8 65 -99 SPO 1997 10 07 20 12 90 6.0 -9 686.90 -59.4 -57.4 -58.8 65 -99 SPO 1997 10 07 20 13 90 5.9 -9 686.90 -59.4 -57.6 -58.8 65 -99 SPO 1997 10 07 20 14 92 6.0 -9 686.90 -59.4 -57.6 -58.8 65 -99 SPO 1997 10 07 20 15 91 5.9 -9 686.90 -59.4 -57.6 -58.8 65 -99 SPO 1997 10 07 20 16 91 5.8 -9 686.90 -59.5 -57.6 -58.9 67 -99 SPO 1997 10 07 20 17 92 5.8 -9 686.90 -59.5 -57.6 -58.9 68 -99 SPO 1997 10 07 20 18 93 5.8 -9 686.80 -59.5 -57.5 -59.0 68 -99 SPO 1997 10 07 20 19 93 5.7 -9 686.80 -59.5 -57.6 -58.9 68 -99 SPO 1997 10 07 20 20 93 5.7 -9 686.80 -59.5 -57.6 -59.0 68 -99 SPO 1997 10 07 20 21 94 5.6 -9 686.80 -59.6 -57.7 -59.0 69 -99 SPO 1997 10 07 20 22 93 5.6 -9 686.80 -59.6 -57.7 -59.0 69 -99 SPO 1997 10 07 20 23 94 5.5 -9 686.80 -59.6 -57.7 -59.1 69 -99 SPO 1997 10 07 20 24 94 5.5 -9 686.80 -59.6 -57.7 -59.1 69 -99 SPO 1997 10 07 20 25 94 5.6 -9 686.80 -59.6 -57.7 -59.1 68 -99 SPO 1997 10 07 20 26 94 5.6 -9 686.80 -59.6 -57.6 -59.1 67 -99 SPO 1997 10 07 20 27 94 5.7 -9 686.80 -59.7 -57.7 -59.1 67 -99 SPO 1997 10 07 20 28 94 5.7 -9 686.90 -59.7 -57.7 -59.2 68 -99 SPO 1997 10 07 20 29 94 5.7 -9 686.80 -59.7 -57.6 -59.2 69 -99 SPO 1997 10 07 20 30 95 5.7 -9 686.80 -59.7 -57.7 -59.2 69 -99 SPO 1997 10 07 20 31 94 5.7 -9 686.80 -59.7 -57.7 -59.2 68 -99 SPO 1997 10 07 20 32 93 5.7 -9 686.80 -59.7 -57.7 -59.2 68 -99 SPO 1997 10 07 20 33 93 5.9 -9 686.80 -59.7 -57.6 -59.2 68 -99 SPO 1997 10 07 20 34 92 5.9 -9 686.80 -59.7 -57.4 -59.2 68 -99 SPO 1997 10 07 20 35 92 5.9 -9 686.80 -59.6 -57.3 -59.2 66 -99 SPO 1997 10 07 20 36 92 5.9 -9 686.80 -59.6 -57.4 -59.2 66 -99 SPO 1997 10 07 20 37 92 6.0 -9 686.80 -59.6 -57.3 -59.2 65 -99 SPO 1997 10 07 20 38 92 6.0 -9 686.80 -59.6 -57.3 -59.2 65 -99 SPO 1997 10 07 20 39 91 6.0 -9 686.80 -59.6 -57.3 -59.2 65 -99 SPO 1997 10 07 20 40 89 6.0 -9 686.80 -59.6 -57.4 -59.2 65 -99 SPO 1997 10 07 20 41 89 6.0 -9 686.80 -59.6 -57.3 -59.2 66 -99 SPO 1997 10 07 20 42 90 6.0 -9 686.80 -59.7 -57.4 -59.2 68 -99 SPO 1997 10 07 20 43 90 6.0 -9 686.80 -59.7 -57.4 -59.2 67 -99 SPO 1997 10 07 20 44 90 6.0 -9 686.80 -59.7 -57.4 -59.3 67 -99 SPO 1997 10 07 20 45 90 6.1 -9 686.80 -59.8 -57.3 -59.3 68 -99 SPO 1997 10 07 20 46 89 6.1 -9 686.80 -59.8 -57.1 -59.3 68 -99 SPO 1997 10 07 20 47 88 6.2 -9 686.80 -59.8 -57.0 -59.3 67 -99 SPO 1997 10 07 20 48 88 6.2 -9 686.70 -59.8 -57.1 -59.4 66 -99 SPO 1997 10 07 20 49 89 6.3 -9 686.70 -59.8 -57.2 -59.4 66 -99 SPO 1997 10 07 20 50 89 6.4 -9 686.70 -59.8 -57.2 -59.4 65 -99 SPO 1997 10 07 20 51 88 6.3 -9 686.80 -59.8 -57.2 -59.4 65 -99 SPO 1997 10 07 20 52 87 6.3 -9 686.70 -59.8 -57.2 -59.4 65 -99 SPO 1997 10 07 20 53 87 6.5 -9 686.70 -59.7 -57.1 -59.3 64 -99 SPO 1997 10 07 20 54 87 6.5 -9 686.70 -59.7 -57.0 -59.3 64 -99 SPO 1997 10 07 20 55 86 6.5 -9 686.70 -59.6 -57.1 -59.3 64 -99 SPO 1997 10 07 20 56 86 6.6 -9 686.70 -59.7 -57.1 -59.3 65 -99 SPO 1997 10 07 20 57 86 6.5 -9 686.70 -59.7 -57.1 -59.3 65 -99 SPO 1997 10 07 20 58 87 6.4 -9 686.70 -59.7 -57.1 -59.3 65 -99 SPO 1997 10 07 20 59 88 6.4 -9 686.70 -59.7 -57.2 -59.3 65 -99 SPO 1997 10 07 21 00 88 6.3 -9 686.70 -59.7 -57.2 -59.3 64 0 SPO 1997 10 07 21 01 89 6.2 -9 686.70 -59.7 -57.1 -59.4 64 -99 SPO 1997 10 07 21 02 88 6.2 -9 686.70 -59.7 -57.1 -59.3 64 -99 SPO 1997 10 07 21 03 87 6.1 -9 686.70 -59.8 -57.1 -59.4 64 -99 SPO 1997 10 07 21 04 88 6.1 -9 686.80 -59.8 -57.1 -59.4 65 -99 SPO 1997 10 07 21 05 88 6.0 -9 686.80 -59.8 -57.2 -59.4 65 -99 SPO 1997 10 07 21 06 89 6.0 -9 686.80 -59.8 -57.2 -59.4 65 -99 SPO 1997 10 07 21 07 89 6.1 -9 686.80 -59.9 -57.0 -59.5 66 -99 SPO 1997 10 07 21 08 88 6.1 -9 686.80 -59.9 -56.9 -59.5 66 -99 SPO 1997 10 07 21 09 88 6.0 -9 686.80 -59.9 -56.7 -59.5 65 -99 SPO 1997 10 07 21 10 88 6.0 -9 686.80 -60.0 -56.7 -59.5 65 -99 SPO 1997 10 07 21 11 86 6.2 -9 686.80 -60.0 -56.7 -59.6 64 -99 SPO 1997 10 07 21 12 85 6.2 -9 686.80 -60.0 -56.8 -59.6 64 -99 SPO 1997 10 07 21 13 86 6.3 -9 686.80 -59.9 -56.8 -59.6 63 -99 SPO 1997 10 07 21 14 85 6.5 -9 686.80 -59.8 -56.7 -59.4 62 -99 SPO 1997 10 07 21 15 86 6.5 -9 686.80 -59.8 -56.6 -59.4 63 -99 SPO 1997 10 07 21 16 86 6.5 -9 686.80 -59.6 -56.7 -59.2 62 -99 SPO 1997 10 07 21 17 85 6.4 -9 686.80 -59.4 -56.8 -59.1 61 -99 SPO 1997 10 07 21 18 86 6.6 -9 686.80 -59.2 -56.8 -59.0 61 -99 SPO 1997 10 07 21 19 86 6.5 -9 686.80 -59.2 -56.7 -59.0 62 -99 SPO 1997 10 07 21 20 85 6.5 -9 686.90 -59.1 -56.6 -58.9 63 -99 SPO 1997 10 07 21 21 85 6.5 -9 686.90 -59.1 -56.6 -58.8 64 -99 SPO 1997 10 07 21 22 85 6.5 -9 686.80 -59.1 -56.6 -58.8 64 -99 SPO 1997 10 07 21 23 85 6.5 -9 686.90 -59.1 -56.6 -58.8 65 -99 SPO 1997 10 07 21 24 83 6.5 -9 686.90 -59.1 -56.8 -58.8 64 -99 SPO 1997 10 07 21 25 83 6.6 -9 686.90 -59.1 -56.8 -58.8 64 -99 SPO 1997 10 07 21 26 84 6.5 -9 686.90 -59.0 -56.8 -58.7 64 -99 SPO 1997 10 07 21 27 83 6.4 -9 686.90 -59.1 -56.8 -58.8 65 -99 SPO 1997 10 07 21 28 83 6.3 -9 686.90 -59.1 -56.9 -58.8 65 -99 SPO 1997 10 07 21 29 84 6.4 -9 686.90 -59.2 -56.9 -58.9 67 -99 SPO 1997 10 07 21 30 83 6.4 -9 686.90 -59.3 -56.6 -59.0 68 -99 SPO 1997 10 07 21 31 84 6.3 -9 686.90 -59.3 -56.2 -59.0 67 -99 SPO 1997 10 07 21 32 87 6.4 -9 686.90 -59.3 -56.0 -59.0 67 -99 SPO 1997 10 07 21 33 88 6.3 -9 686.80 -59.3 -56.0 -59.0 66 -99 SPO 1997 10 07 21 34 88 6.3 -9 686.90 -59.3 -56.4 -58.9 65 -99 SPO 1997 10 07 21 35 86 6.0 -9 686.90 -59.3 -56.7 -58.8 65 -99 SPO 1997 10 07 21 36 87 6.0 -9 686.90 -59.3 -56.7 -58.8 65 -99 SPO 1997 10 07 21 37 86 6.0 -9 686.90 -59.3 -56.8 -58.8 65 -99 SPO 1997 10 07 21 38 86 6.1 -9 686.90 -59.4 -56.8 -58.8 65 -99 SPO 1997 10 07 21 39 85 6.0 -9 686.80 -59.4 -56.7 -58.8 65 -99 SPO 1997 10 07 21 40 84 6.0 -9 686.80 -59.3 -56.6 -58.8 65 -99 SPO 1997 10 07 21 41 83 6.0 -9 686.80 -59.4 -56.8 -58.9 66 -99 SPO 1997 10 07 21 42 81 6.2 -9 686.80 -59.4 -57.0 -59.0 66 -99 SPO 1997 10 07 21 43 80 6.3 -9 686.80 -59.3 -57.0 -59.0 66 -99 SPO 1997 10 07 21 44 79 6.4 -9 686.80 -59.2 -56.8 -58.9 65 -99 SPO 1997 10 07 21 45 79 6.5 -9 686.80 -59.2 -56.6 -58.8 65 -99 SPO 1997 10 07 21 46 76 6.4 -9 686.80 -59.1 -56.3 -58.7 64 -99 SPO 1997 10 07 21 47 76 6.6 -9 686.80 -59.2 -56.2 -58.8 65 -99 SPO 1997 10 07 21 48 76 7.0 -9 686.80 -59.2 -55.9 -58.9 64 -99 SPO 1997 10 07 21 49 77 7.1 -9 686.70 -59.2 -55.6 -58.9 65 -99 SPO 1997 10 07 21 50 76 7.1 -9 686.70 -59.0 -55.6 -58.8 64 -99 SPO 1997 10 07 21 51 77 7.4 -9 686.60 -59.0 -55.6 -58.8 64 -99 SPO 1997 10 07 21 52 77 7.5 -9 686.60 -58.9 -55.4 -58.8 64 -99 SPO 1997 10 07 21 53 76 7.7 -9 686.60 -58.8 -55.3 -58.7 65 -99 SPO 1997 10 07 21 54 76 7.5 -9 686.60 -58.8 -55.5 -58.7 65 -99 SPO 1997 10 07 21 55 77 7.4 -9 686.60 -58.7 -55.4 -58.7 65 -99 SPO 1997 10 07 21 56 77 7.4 -9 686.60 -58.7 -55.4 -58.7 65 -99 SPO 1997 10 07 21 57 78 7.3 -9 686.60 -58.7 -55.6 -58.6 66 -99 SPO 1997 10 07 21 58 79 7.4 -9 686.60 -58.7 -55.8 -58.5 65 -99 SPO 1997 10 07 21 59 79 7.3 -9 686.60 -58.7 -55.8 -58.4 65 -99 SPO 1997 10 07 22 00 79 7.1 -9 686.60 -58.7 -55.9 -58.4 66 0 SPO 1997 10 07 22 01 79 7.0 -9 686.60 -58.8 -56.0 -58.4 67 -99 SPO 1997 10 07 22 02 79 7.0 -9 686.60 -58.9 -56.1 -58.5 68 -99 SPO 1997 10 07 22 03 78 7.0 -9 686.60 -58.9 -56.2 -58.6 69 -99 SPO 1997 10 07 22 04 78 7.0 -9 686.60 -59.0 -56.0 -58.7 70 -99 SPO 1997 10 07 22 05 77 7.0 -9 686.60 -59.0 -56.0 -58.7 70 -99 SPO 1997 10 07 22 06 76 7.0 -9 686.60 -59.1 -56.0 -58.7 70 -99 SPO 1997 10 07 22 07 76 7.0 -9 686.60 -59.2 -55.9 -58.7 69 -99 SPO 1997 10 07 22 08 76 7.0 -9 686.60 -59.2 -55.6 -58.8 68 -99 SPO 1997 10 07 22 09 77 7.0 -9 686.60 -59.2 -55.5 -58.8 67 -99 SPO 1997 10 07 22 10 76 6.8 -9 686.60 -59.3 -55.8 -58.8 67 -99 SPO 1997 10 07 22 11 76 6.8 -9 686.60 -59.3 -56.0 -58.8 66 -99 SPO 1997 10 07 22 12 76 6.8 -9 686.60 -59.4 -55.7 -58.9 67 -99 SPO 1997 10 07 22 13 76 6.8 -9 686.60 -59.4 -55.6 -58.9 67 -99 SPO 1997 10 07 22 14 77 6.8 -9 686.60 -59.5 -55.6 -58.9 68 -99 SPO 1997 10 07 22 15 76 6.8 -9 686.60 -59.4 -55.4 -58.9 67 -99 SPO 1997 10 07 22 16 77 6.6 -9 686.60 -59.5 -55.4 -58.9 67 -99 SPO 1997 10 07 22 17 77 6.6 -9 686.60 -59.4 -55.4 -58.9 66 -99 SPO 1997 10 07 22 18 78 6.5 -9 686.60 -59.5 -55.3 -58.9 67 -99 SPO 1997 10 07 22 19 79 6.5 -9 686.60 -59.5 -55.3 -59.0 66 -99 SPO 1997 10 07 22 20 79 6.2 -9 686.60 -59.5 -55.4 -58.9 66 -99 SPO 1997 10 07 22 21 79 6.1 -9 686.60 -59.4 -55.5 -58.8 65 -99 SPO 1997 10 07 22 22 80 6.1 -9 686.60 -59.4 -55.5 -58.8 65 -99 SPO 1997 10 07 22 23 81 6.1 -9 686.60 -59.4 -55.7 -58.8 65 -99 SPO 1997 10 07 22 24 80 6.1 -9 686.60 -59.3 -55.8 -58.7 64 -99 SPO 1997 10 07 22 25 80 6.1 -9 686.60 -59.3 -56.0 -58.7 65 -99 SPO 1997 10 07 22 26 78 6.1 -9 686.60 -59.4 -55.8 -58.7 65 -99 SPO 1997 10 07 22 27 79 6.2 -9 686.70 -59.4 -55.4 -58.8 65 -99 SPO 1997 10 07 22 28 81 6.2 -9 686.60 -59.4 -55.4 -58.7 66 -99 SPO 1997 10 07 22 29 82 6.2 -9 686.60 -59.4 -55.7 -58.7 66 -99 SPO 1997 10 07 22 30 82 6.2 -9 686.60 -59.4 -55.9 -58.6 65 -99 SPO 1997 10 07 22 31 81 6.1 -9 686.60 -59.4 -56.0 -58.6 65 -99 SPO 1997 10 07 22 32 79 6.1 -9 686.60 -59.3 -55.7 -58.6 65 -99 SPO 1997 10 07 22 33 80 6.0 -9 686.60 -59.3 -55.5 -58.6 65 -99 SPO 1997 10 07 22 34 81 5.9 -9 686.60 -59.2 -55.5 -58.5 64 -99 SPO 1997 10 07 22 35 82 6.0 -9 686.60 -59.2 -55.8 -58.5 63 -99 SPO 1997 10 07 22 36 82 6.0 -9 686.60 -59.2 -55.8 -58.5 64 -99 SPO 1997 10 07 22 37 83 6.0 -9 686.60 -59.2 -56.0 -58.5 65 -99 SPO 1997 10 07 22 38 82 6.0 -9 686.60 -59.2 -56.2 -58.4 65 -99 SPO 1997 10 07 22 39 82 6.0 -9 686.60 -59.2 -56.2 -58.4 65 -99 SPO 1997 10 07 22 40 80 6.1 -9 686.60 -59.2 -56.2 -58.4 65 -99 SPO 1997 10 07 22 41 80 6.0 -9 686.60 -59.1 -56.2 -58.4 65 -99 SPO 1997 10 07 22 42 80 5.9 -9 686.60 -59.1 -56.3 -58.4 65 -99 SPO 1997 10 07 22 43 80 5.9 -9 686.60 -59.2 -56.3 -58.6 65 -99 SPO 1997 10 07 22 44 79 5.8 -9 686.60 -59.2 -56.3 -58.7 65 -99 SPO 1997 10 07 22 45 77 5.8 -9 686.60 -59.2 -56.4 -58.8 65 -99 SPO 1997 10 07 22 46 77 5.7 -9 686.60 -59.2 -56.4 -58.8 65 -99 SPO 1997 10 07 22 47 76 5.8 -9 686.50 -59.2 -56.4 -58.8 65 -99 SPO 1997 10 07 22 48 75 5.8 -9 686.50 -59.2 -56.4 -58.9 65 -99 SPO 1997 10 07 22 49 74 5.9 -9 686.50 -59.3 -56.0 -59.0 66 -99 SPO 1997 10 07 22 50 74 6.0 -9 686.50 -59.4 -55.7 -58.9 68 -99 SPO 1997 10 07 22 51 73 6.2 -9 686.50 -59.4 -55.5 -58.9 68 -99 SPO 1997 10 07 22 52 72 6.4 -9 686.50 -59.4 -55.4 -58.9 68 -99 SPO 1997 10 07 22 53 72 6.5 -9 686.50 -59.5 -55.1 -58.9 68 -99 SPO 1997 10 07 22 54 72 6.5 -9 686.50 -59.5 -54.8 -59.0 67 -99 SPO 1997 10 07 22 55 73 6.5 -9 686.50 -59.6 -54.9 -59.0 67 -99 SPO 1997 10 07 22 56 74 6.6 -9 686.50 -59.5 -54.8 -59.0 66 -99 SPO 1997 10 07 22 57 74 6.6 -9 686.50 -59.5 -54.8 -58.9 65 -99 SPO 1997 10 07 22 58 75 6.6 -9 686.50 -59.4 -54.9 -58.9 65 -99 SPO 1997 10 07 22 59 75 6.6 -9 686.50 -59.4 -55.0 -58.9 65 -99 SPO 1997 10 07 23 00 74 6.6 -9 686.50 -59.3 -55.1 -59.0 65 0 SPO 1997 10 07 23 01 73 6.6 -9 686.50 -59.2 -55.0 -59.0 64 -99 SPO 1997 10 07 23 02 74 6.7 -9 686.50 -59.1 -55.1 -59.0 64 -99 SPO 1997 10 07 23 03 76 6.7 -9 686.50 -59.1 -55.1 -58.9 65 -99 SPO 1997 10 07 23 04 77 6.5 -9 686.50 -59.0 -55.3 -58.8 65 -99 SPO 1997 10 07 23 05 77 6.5 -9 686.50 -59.0 -55.5 -58.8 65 -99 SPO 1997 10 07 23 06 78 6.5 -9 686.50 -59.0 -55.5 -58.8 65 -99 SPO 1997 10 07 23 07 77 6.4 -9 686.50 -59.0 -55.5 -58.8 65 -99 SPO 1997 10 07 23 08 76 6.5 -9 686.50 -58.9 -55.6 -58.8 65 -99 SPO 1997 10 07 23 09 76 6.5 -9 686.50 -59.0 -55.5 -58.8 65 -99 SPO 1997 10 07 23 10 75 6.5 -9 686.50 -59.0 -55.3 -58.8 65 -99 SPO 1997 10 07 23 11 73 6.6 -9 686.50 -59.0 -55.1 -58.9 66 -99 SPO 1997 10 07 23 12 73 6.6 -9 686.50 -59.0 -54.8 -58.8 67 -99 SPO 1997 10 07 23 13 74 6.6 -9 686.50 -59.1 -54.7 -58.6 68 -99 SPO 1997 10 07 23 14 74 6.7 -9 686.50 -59.1 -54.7 -58.6 68 -99 SPO 1997 10 07 23 15 74 6.7 -9 686.50 -59.0 -54.8 -58.5 68 -99 SPO 1997 10 07 23 16 74 6.6 -9 686.50 -59.0 -54.7 -58.5 68 -99 SPO 1997 10 07 23 17 74 6.7 -9 686.50 -59.0 -54.7 -58.5 67 -99 SPO 1997 10 07 23 18 75 6.7 -9 686.50 -59.0 -54.7 -58.5 67 -99 SPO 1997 10 07 23 19 75 6.7 -9 686.50 -59.0 -54.7 -58.5 66 -99 SPO 1997 10 07 23 20 76 6.6 -9 686.50 -59.0 -54.7 -58.5 66 -99 SPO 1997 10 07 23 21 75 6.6 -9 686.50 -59.1 -54.8 -58.5 67 -99 SPO 1997 10 07 23 22 75 6.5 -9 686.40 -59.1 -54.7 -58.5 67 -99 SPO 1997 10 07 23 23 75 6.6 -9 686.40 -59.2 -54.7 -58.6 67 -99 SPO 1997 10 07 23 24 74 6.7 -9 686.40 -59.2 -54.7 -58.6 67 -99 SPO 1997 10 07 23 25 74 6.8 -9 686.40 -59.2 -54.6 -58.6 67 -99 SPO 1997 10 07 23 26 74 7.0 -9 686.40 -59.2 -54.6 -58.6 68 -99 SPO 1997 10 07 23 27 74 7.0 -9 686.40 -59.1 -54.6 -58.6 67 -99 SPO 1997 10 07 23 28 75 7.3 -9 686.40 -59.1 -54.6 -58.5 67 -99 SPO 1997 10 07 23 29 76 7.4 -9 686.40 -59.0 -54.7 -58.4 66 -99 SPO 1997 10 07 23 30 77 7.4 -9 686.40 -58.9 -54.8 -58.4 65 -99 SPO 1997 10 07 23 31 78 7.2 -9 686.40 -58.8 -54.9 -58.4 65 -99 SPO 1997 10 07 23 32 77 7.2 -9 686.40 -58.7 -54.8 -58.5 63 -99 SPO 1997 10 07 23 33 78 7.1 -9 686.40 -58.7 -54.7 -58.5 64 -99 SPO 1997 10 07 23 34 78 7.1 -9 686.40 -58.7 -54.7 -58.4 64 -99 SPO 1997 10 07 23 35 79 7.0 -9 686.40 -58.7 -54.8 -58.2 65 -99 SPO 1997 10 07 23 36 79 7.0 -9 686.40 -58.7 -54.9 -58.2 65 -99 SPO 1997 10 07 23 37 79 7.0 -9 686.40 -58.7 -54.9 -58.2 65 -99 SPO 1997 10 07 23 38 79 7.0 -9 686.50 -58.8 -54.9 -58.2 66 -99 SPO 1997 10 07 23 39 79 7.0 -9 686.50 -58.8 -54.9 -58.2 66 -99 SPO 1997 10 07 23 40 80 7.0 -9 686.50 -58.9 -55.0 -58.2 68 -99 SPO 1997 10 07 23 41 79 7.0 -9 686.50 -58.9 -55.0 -58.3 67 -99 SPO 1997 10 07 23 42 79 6.9 -9 686.50 -58.9 -55.0 -58.2 66 -99 SPO 1997 10 07 23 43 79 6.9 -9 686.50 -58.9 -55.0 -58.2 65 -99 SPO 1997 10 07 23 44 80 6.8 -9 686.50 -58.8 -55.0 -58.3 65 -99 SPO 1997 10 07 23 45 80 6.8 -9 686.40 -58.7 -54.9 -58.2 63 -99 SPO 1997 10 07 23 46 80 6.6 -9 686.50 -58.8 -55.0 -58.2 64 -99 SPO 1997 10 07 23 47 79 6.6 -9 686.50 -58.8 -55.0 -58.2 64 -99 SPO 1997 10 07 23 48 79 6.6 -9 686.50 -58.8 -55.0 -58.2 65 -99 SPO 1997 10 07 23 49 79 6.6 -9 686.40 -58.9 -55.1 -58.2 65 -99 SPO 1997 10 07 23 50 79 6.7 -9 686.40 -58.9 -55.2 -58.2 66 -99 SPO 1997 10 07 23 51 79 6.7 -9 686.40 -58.9 -55.2 -58.2 66 -99 SPO 1997 10 07 23 52 79 6.7 -9 686.40 -58.9 -55.2 -58.2 66 -99 SPO 1997 10 07 23 53 79 6.7 -9 686.40 -58.9 -55.1 -58.1 65 -99 SPO 1997 10 07 23 54 80 6.7 -9 686.40 -58.9 -55.1 -58.1 65 -99 SPO 1997 10 07 23 55 80 6.8 -9 686.40 -58.9 -55.2 -58.1 65 -99 SPO 1997 10 07 23 56 81 6.9 -9 686.40 -58.9 -55.3 -58.2 65 -99 SPO 1997 10 07 23 57 81 6.8 -9 686.40 -58.9 -55.3 -58.2 65 -99 SPO 1997 10 07 23 58 82 6.9 -9 686.40 -58.9 -55.2 -58.2 -99 -99 SPO 1997 10 07 23 59 82 6.9 -9 686.40 -58.9 -55.2 -58.1 -99 -99 SPO 1997 10 08 00 00 80 6.8 -9 686.60 -58.8 -55.3 -58.2 -99 0 SPO 1997 10 08 00 01 81 6.9 -9 686.50 -58.8 -55.1 -58.2 -99 -99 SPO 1997 10 08 00 02 80 6.9 -9 686.40 -58.8 -54.9 -58.2 -99 -99 SPO 1997 10 08 00 03 80 6.9 -9 686.40 -58.8 -55.0 -58.4 65 -99 SPO 1997 10 08 00 04 79 6.8 -9 686.40 -58.8 -55.0 -58.4 65 -99 SPO 1997 10 08 00 05 79 6.8 -9 686.40 -58.8 -55.2 -58.3 65 -99 SPO 1997 10 08 00 06 81 6.9 -9 686.40 -58.7 -55.0 -58.2 64 -99 SPO 1997 10 08 00 07 80 6.9 -9 686.40 -58.7 -55.0 -58.0 63 -99 SPO 1997 10 08 00 08 80 6.9 -9 686.40 -58.7 -55.2 -58.1 63 -99 SPO 1997 10 08 00 09 83 7.1 -9 686.40 -58.7 -55.0 -58.0 64 -99 SPO 1997 10 08 00 10 81 6.7 -9 686.40 -58.6 -55.2 -58.0 64 -99 SPO 1997 10 08 00 11 81 6.6 -9 686.40 -58.7 -55.5 -58.0 65 -99 SPO 1997 10 08 00 12 83 6.5 -9 686.40 -58.7 -55.6 -58.0 65 -99 SPO 1997 10 08 00 13 84 6.6 -9 686.40 -58.7 -55.5 -57.9 66 -99 SPO 1997 10 08 00 14 83 6.4 -9 686.40 -58.7 -55.7 -57.9 66 -99 SPO 1997 10 08 00 15 83 6.3 -9 686.30 -58.7 -55.8 -57.9 65 -99 SPO 1997 10 08 00 16 82 6.4 -9 686.30 -58.8 -55.8 -58.0 66 -99 SPO 1997 10 08 00 17 81 6.4 -9 686.30 -58.8 -55.7 -58.1 65 -99 SPO 1997 10 08 00 18 80 6.5 -9 686.30 -58.9 -55.4 -58.1 66 -99 SPO 1997 10 08 00 19 80 6.6 -9 686.30 -59.0 -55.2 -58.1 66 -99 SPO 1997 10 08 00 20 80 6.7 -9 686.30 -59.0 -55.2 -58.2 65 -99 SPO 1997 10 08 00 21 81 6.7 -9 686.30 -59.0 -55.2 -58.2 65 -99 SPO 1997 10 08 00 22 81 6.8 -9 686.20 -59.0 -55.3 -58.2 65 -99 SPO 1997 10 08 00 23 82 6.8 -9 686.20 -59.0 -55.5 -58.2 65 -99 SPO 1997 10 08 00 24 83 6.7 -9 686.20 -58.9 -55.6 -58.1 65 -99 SPO 1997 10 08 00 25 82 6.6 -9 686.20 -58.9 -55.8 -58.1 65 -99 SPO 1997 10 08 00 26 83 6.7 -9 686.20 -58.9 -55.9 -58.2 65 -99 SPO 1997 10 08 00 27 82 6.5 -9 686.20 -58.9 -55.8 -58.1 65 -99 SPO 1997 10 08 00 28 82 6.5 -9 686.20 -58.9 -55.8 -58.1 64 -99 SPO 1997 10 08 00 29 82 6.4 -9 686.20 -58.8 -55.9 -58.1 63 -99 SPO 1997 10 08 00 30 81 6.4 -9 686.20 -58.8 -55.9 -58.0 63 -99 SPO 1997 10 08 00 31 81 6.5 -9 686.20 -58.8 -55.8 -58.1 64 -99 SPO 1997 10 08 00 32 81 6.6 -9 686.20 -58.8 -55.8 -58.2 64 -99 SPO 1997 10 08 00 33 79 6.4 -9 686.20 -58.8 -55.7 -58.3 65 -99 SPO 1997 10 08 00 34 78 6.4 -9 686.20 -58.8 -55.6 -58.3 65 -99 SPO 1997 10 08 00 35 78 6.3 -9 686.20 -58.8 -55.6 -58.3 65 -99 SPO 1997 10 08 00 36 78 6.3 -9 686.20 -58.9 -55.6 -58.4 65 -99 SPO 1997 10 08 00 37 79 6.4 -9 686.20 -58.9 -55.6 -58.4 65 -99 SPO 1997 10 08 00 38 78 6.3 -9 686.20 -58.9 -55.6 -58.3 65 -99 SPO 1997 10 08 00 39 78 6.3 -9 686.20 -58.9 -55.7 -58.3 65 -99 SPO 1997 10 08 00 40 78 6.5 -9 686.20 -59.0 -55.7 -58.5 65 -99 SPO 1997 10 08 00 41 76 6.4 -9 686.20 -59.0 -55.6 -58.6 64 -99 SPO 1997 10 08 00 42 74 6.4 -9 686.20 -58.9 -55.5 -58.7 63 -99 SPO 1997 10 08 00 43 73 6.4 -9 686.20 -58.9 -55.5 -58.7 62 -99 SPO 1997 10 08 00 44 73 6.5 -9 686.20 -59.0 -55.4 -58.7 64 -99 SPO 1997 10 08 00 45 72 6.7 -9 686.20 -59.0 -55.3 -58.6 64 -99 SPO 1997 10 08 00 46 73 6.6 -9 686.20 -58.9 -55.3 -58.5 65 -99 SPO 1997 10 08 00 47 73 6.5 -9 686.20 -58.9 -55.3 -58.4 65 -99 SPO 1997 10 08 00 48 74 6.4 -9 686.20 -58.9 -55.3 -58.4 65 -99 SPO 1997 10 08 00 49 74 6.3 -9 686.20 -58.8 -55.3 -58.3 64 -99 SPO 1997 10 08 00 50 74 6.2 -9 686.20 -58.8 -55.4 -58.2 64 -99 SPO 1997 10 08 00 51 74 6.2 -9 686.10 -58.8 -55.4 -58.2 64 -99 SPO 1997 10 08 00 52 74 6.0 -9 686.10 -58.8 -55.4 -58.2 64 -99 SPO 1997 10 08 00 53 75 6.0 -9 686.10 -58.8 -55.6 -58.2 63 -99 SPO 1997 10 08 00 54 75 6.0 -9 686.10 -58.8 -55.6 -58.2 64 -99 SPO 1997 10 08 00 55 76 5.9 -9 686.10 -58.9 -55.7 -58.2 65 -99 SPO 1997 10 08 00 56 75 5.9 -9 686.10 -58.9 -55.7 -58.2 65 -99 SPO 1997 10 08 00 57 76 6.0 -9 686.10 -58.9 -55.7 -58.2 65 -99 SPO 1997 10 08 00 58 75 5.8 -9 686.10 -59.0 -55.6 -58.2 65 -99 SPO 1997 10 08 00 59 74 5.8 -9 686.10 -59.0 -55.6 -58.2 65 -99 SPO 1997 10 08 01 00 73 5.7 -9 686.10 -59.0 -55.5 -58.2 65 0 SPO 1997 10 08 01 01 72 5.8 -9 686.10 -59.0 -55.4 -58.3 65 -99 SPO 1997 10 08 01 02 72 5.8 -9 686.10 -59.0 -55.4 -58.3 65 -99 SPO 1997 10 08 01 03 72 5.8 -9 686.10 -59.0 -55.3 -58.3 64 -99 SPO 1997 10 08 01 04 72 5.8 -9 686.10 -59.0 -55.4 -58.3 64 -99 SPO 1997 10 08 01 05 71 5.7 -9 686.10 -59.0 -55.4 -58.3 63 -99 SPO 1997 10 08 01 06 71 5.8 -9 686.10 -59.0 -55.3 -58.3 63 -99 SPO 1997 10 08 01 07 70 5.8 -9 686.10 -59.0 -55.4 -58.3 62 -99 SPO 1997 10 08 01 08 70 6.0 -9 686.10 -59.0 -55.3 -58.3 64 -99 SPO 1997 10 08 01 09 71 6.1 -9 686.10 -58.9 -55.2 -58.2 64 -99 SPO 1997 10 08 01 10 71 6.1 -9 686.10 -58.8 -55.1 -58.2 64 -99 SPO 1997 10 08 01 11 69 6.1 -9 686.10 -58.8 -55.1 -58.1 64 -99 SPO 1997 10 08 01 12 70 6.2 -9 686.10 -58.8 -55.0 -58.2 64 -99 SPO 1997 10 08 01 13 70 6.2 -9 686.10 -58.8 -54.9 -58.1 65 -99 SPO 1997 10 08 01 14 71 6.2 -9 686.10 -58.8 -54.9 -58.1 65 -99 SPO 1997 10 08 01 15 71 6.3 -9 686.10 -58.8 -54.9 -58.2 65 -99 SPO 1997 10 08 01 16 71 6.4 -9 686.10 -58.8 -54.8 -58.2 64 -99 SPO 1997 10 08 01 17 72 6.7 -9 686.10 -58.8 -54.8 -58.2 64 -99 SPO 1997 10 08 01 18 71 6.7 -9 686.00 -58.7 -54.9 -58.1 63 -99 SPO 1997 10 08 01 19 71 6.8 -9 686.10 -58.6 -54.9 -58.1 62 -99 SPO 1997 10 08 01 20 71 6.8 -9 686.00 -58.5 -54.9 -58.1 62 -99 SPO 1997 10 08 01 21 71 6.7 -9 686.00 -58.4 -54.9 -58.2 62 -99 SPO 1997 10 08 01 22 70 6.8 -9 686.00 -58.4 -54.8 -58.2 62 -99 SPO 1997 10 08 01 23 69 6.8 -9 686.00 -58.4 -54.9 -58.2 62 -99 SPO 1997 10 08 01 24 70 7.2 -9 686.00 -58.4 -54.8 -58.1 62 -99 SPO 1997 10 08 01 25 68 7.0 -9 685.90 -58.3 -54.8 -58.2 62 -99 SPO 1997 10 08 01 26 69 6.9 -9 685.90 -58.3 -54.9 -58.1 62 -99 SPO 1997 10 08 01 27 69 7.0 -9 685.90 -58.2 -54.9 -58.1 61 -99 SPO 1997 10 08 01 28 70 7.2 -9 685.90 -58.2 -54.6 -58.1 61 -99 SPO 1997 10 08 01 29 68 6.8 -9 685.90 -58.2 -54.9 -58.1 61 -99 SPO 1997 10 08 01 30 67 6.8 -9 685.90 -58.2 -54.9 -58.1 62 -99 SPO 1997 10 08 01 31 68 7.2 -9 685.80 -58.1 -54.8 -58.1 61 -99 SPO 1997 10 08 01 32 65 6.9 -9 685.80 -58.2 -54.9 -58.1 62 -99 SPO 1997 10 08 01 33 67 7.3 -9 685.80 -58.1 -54.7 -58.0 62 -99 SPO 1997 10 08 01 34 67 7.3 -9 685.80 -58.0 -54.7 -58.0 62 -99 SPO 1997 10 08 01 35 66 7.4 -9 685.80 -58.0 -54.7 -57.9 62 -99 SPO 1997 10 08 01 36 66 7.4 -9 685.80 -57.9 -54.7 -57.8 61 -99 SPO 1997 10 08 01 37 66 7.3 -9 685.80 -57.8 -54.7 -57.8 61 -99 SPO 1997 10 08 01 38 65 7.4 -9 685.80 -57.8 -54.8 -57.8 61 -99 SPO 1997 10 08 01 39 66 7.5 -9 685.80 -57.8 -54.7 -57.7 61 -99 SPO 1997 10 08 01 40 66 7.6 -9 685.80 -57.7 -54.7 -57.7 61 -99 SPO 1997 10 08 01 41 66 7.6 -9 685.80 -57.7 -54.7 -57.7 61 -99 SPO 1997 10 08 01 42 67 7.7 -9 685.80 -57.6 -54.7 -57.6 60 -99 SPO 1997 10 08 01 43 67 7.5 -9 685.80 -57.6 -54.6 -57.6 62 -99 SPO 1997 10 08 01 44 68 7.4 -9 685.80 -57.7 -54.5 -57.6 63 -99 SPO 1997 10 08 01 45 68 7.4 -9 685.80 -57.8 -54.5 -57.7 65 -99 SPO 1997 10 08 01 46 68 7.3 -9 685.80 -57.8 -54.4 -57.8 65 -99 SPO 1997 10 08 01 47 69 7.4 -9 685.80 -57.9 -54.5 -57.8 66 -99 SPO 1997 10 08 01 48 68 7.4 -9 685.80 -57.9 -54.4 -57.8 66 -99 SPO 1997 10 08 01 49 70 7.5 -9 685.80 -57.9 -54.4 -57.8 64 -99 SPO 1997 10 08 01 50 69 7.3 -9 685.80 -57.8 -54.5 -57.7 62 -99 SPO 1997 10 08 01 51 70 7.3 -9 685.80 -57.8 -54.6 -57.8 61 -99 SPO 1997 10 08 01 52 69 7.2 -9 685.80 -57.8 -54.7 -57.8 61 -99 SPO 1997 10 08 01 53 69 7.2 -9 685.80 -57.8 -54.7 -57.7 60 -99 SPO 1997 10 08 01 54 69 7.2 -9 685.80 -57.8 -54.7 -57.7 61 -99 SPO 1997 10 08 01 55 69 7.1 -9 685.80 -57.8 -54.7 -57.7 62 -99 SPO 1997 10 08 01 56 69 7.0 -9 685.80 -57.8 -54.8 -57.7 62 -99 SPO 1997 10 08 01 57 70 7.1 -9 685.80 -57.8 -54.7 -57.7 63 -99 SPO 1997 10 08 01 58 69 7.1 -9 685.80 -57.8 -54.8 -57.7 63 -99 SPO 1997 10 08 01 59 71 6.8 -9 685.80 -57.8 -54.8 -57.6 63 -99 SPO 1997 10 08 02 00 70 6.9 -9 685.80 -57.8 -54.8 -57.4 63 0 SPO 1997 10 08 02 01 69 6.9 -9 685.80 -57.8 -54.7 -57.5 61 -99 SPO 1997 10 08 02 02 68 6.8 -9 685.80 -57.8 -54.6 -57.4 61 -99 SPO 1997 10 08 02 03 70 6.8 -9 685.80 -57.8 -54.6 -57.4 61 -99 SPO 1997 10 08 02 04 70 6.7 -9 685.80 -57.8 -54.5 -57.4 61 -99 SPO 1997 10 08 02 05 71 6.9 -9 685.80 -57.8 -54.7 -57.4 61 -99 SPO 1997 10 08 02 06 71 6.9 -9 685.80 -57.8 -54.7 -57.4 63 -99 SPO 1997 10 08 02 07 70 6.7 -9 685.80 -57.7 -54.8 -57.3 63 -99 SPO 1997 10 08 02 08 70 6.6 -9 685.80 -57.8 -54.7 -57.4 65 -99 SPO 1997 10 08 02 09 69 6.7 -9 685.80 -57.8 -54.5 -57.4 65 -99 SPO 1997 10 08 02 10 69 6.6 -9 685.80 -57.8 -54.4 -57.4 65 -99 SPO 1997 10 08 02 11 70 6.8 -9 685.80 -57.9 -54.5 -57.4 66 -99 SPO 1997 10 08 02 12 70 6.9 -9 685.70 -57.8 -54.6 -57.4 65 -99 SPO 1997 10 08 02 13 70 6.9 -9 685.70 -57.8 -54.6 -57.4 65 -99 SPO 1997 10 08 02 14 70 6.7 -9 685.70 -57.8 -54.7 -57.3 64 -99 SPO 1997 10 08 02 15 71 6.8 -9 685.70 -57.8 -54.6 -57.3 64 -99 SPO 1997 10 08 02 16 71 6.9 -9 685.70 -57.7 -54.6 -57.3 63 -99 SPO 1997 10 08 02 17 71 7.1 -9 685.70 -57.8 -54.5 -57.4 65 -99 SPO 1997 10 08 02 18 70 7.1 -9 685.70 -57.8 -54.6 -57.4 65 -99 SPO 1997 10 08 02 19 71 7.4 -9 685.70 -57.8 -54.5 -57.4 65 -99 SPO 1997 10 08 02 20 70 7.2 -9 685.70 -57.8 -54.7 -57.4 66 -99 SPO 1997 10 08 02 21 69 7.5 -9 685.70 -57.8 -54.6 -57.4 66 -99 SPO 1997 10 08 02 22 69 7.4 -9 685.70 -57.7 -54.4 -57.3 66 -99 SPO 1997 10 08 02 23 69 7.5 -9 685.70 -57.6 -54.2 -57.2 65 -99 SPO 1997 10 08 02 24 68 7.5 -9 685.70 -57.5 -54.3 -57.1 64 -99 SPO 1997 10 08 02 25 69 7.4 -9 685.70 -57.6 -54.4 -57.2 65 -99 SPO 1997 10 08 02 26 70 7.6 -9 685.70 -57.6 -54.3 -57.3 64 -99 SPO 1997 10 08 02 27 71 7.6 -9 685.70 -57.7 -54.4 -57.3 65 -99 SPO 1997 10 08 02 28 71 7.6 -9 685.70 -57.8 -54.3 -57.4 66 -99 SPO 1997 10 08 02 29 70 7.6 -9 685.70 -57.9 -54.2 -57.4 67 -99 SPO 1997 10 08 02 30 68 7.5 -9 685.70 -57.8 -54.1 -57.4 66 -99 SPO 1997 10 08 02 31 67 7.6 -9 685.60 -57.6 -54.0 -57.1 65 -99 SPO 1997 10 08 02 32 66 7.5 -9 685.60 -57.3 -54.2 -57.0 63 -99 SPO 1997 10 08 02 33 67 7.6 -9 685.60 -57.3 -54.2 -57.0 63 -99 SPO 1997 10 08 02 34 67 7.2 -9 685.70 -57.3 -54.3 -56.9 64 -99 SPO 1997 10 08 02 35 67 7.3 -9 685.60 -57.2 -54.4 -56.8 64 -99 SPO 1997 10 08 02 36 67 7.0 -9 685.60 -57.2 -54.6 -56.8 64 -99 SPO 1997 10 08 02 37 69 7.0 -9 685.60 -57.2 -54.5 -56.8 64 -99 SPO 1997 10 08 02 38 69 7.0 -9 685.60 -57.3 -54.4 -56.9 65 -99 SPO 1997 10 08 02 39 69 6.8 -9 685.60 -57.4 -54.4 -57.0 66 -99 SPO 1997 10 08 02 40 68 6.9 -9 685.60 -57.5 -54.5 -57.0 67 -99 SPO 1997 10 08 02 41 68 6.9 -9 685.60 -57.4 -54.7 -57.0 67 -99 SPO 1997 10 08 02 42 68 7.0 -9 685.60 -57.6 -54.5 -57.2 68 -99 SPO 1997 10 08 02 43 68 7.2 -9 685.50 -57.6 -54.3 -57.2 67 -99 SPO 1997 10 08 02 44 68 7.4 -9 685.50 -57.6 -54.2 -57.2 67 -99 SPO 1997 10 08 02 45 69 7.5 -9 685.50 -57.5 -54.4 -57.1 67 -99 SPO 1997 10 08 02 46 70 7.5 -9 685.50 -57.6 -54.4 -57.2 67 -99 SPO 1997 10 08 02 47 70 7.5 -9 685.50 -57.6 -54.5 -57.2 67 -99 SPO 1997 10 08 02 48 68 7.7 -9 685.50 -57.6 -54.4 -57.2 66 -99 SPO 1997 10 08 02 49 68 7.7 -9 685.50 -57.4 -54.3 -57.0 63 -99 SPO 1997 10 08 02 50 68 7.7 -9 685.50 -57.3 -54.3 -56.9 63 -99 SPO 1997 10 08 02 51 69 7.8 -9 685.50 -57.4 -54.3 -57.0 64 -99 SPO 1997 10 08 02 52 69 7.8 -9 685.50 -57.4 -54.4 -57.1 65 -99 SPO 1997 10 08 02 53 68 7.6 -9 685.50 -57.5 -54.4 -57.1 66 -99 SPO 1997 10 08 02 54 69 7.7 -9 685.50 -57.5 -54.2 -57.1 66 -99 SPO 1997 10 08 02 55 69 7.9 -9 685.50 -57.6 -54.0 -57.2 67 -99 SPO 1997 10 08 02 56 67 7.7 -9 685.50 -57.6 -54.2 -57.2 66 -99 SPO 1997 10 08 02 57 69 7.8 -9 685.40 -57.5 -54.2 -57.1 65 -99 SPO 1997 10 08 02 58 70 7.9 -9 685.40 -57.5 -54.1 -57.1 65 -99 SPO 1997 10 08 02 59 70 7.7 -9 685.50 -57.4 -54.2 -57.0 64 -99 SPO 1997 10 08 03 00 71 7.7 -9 685.50 -57.4 -54.4 -57.0 64 0 SPO 1997 10 08 03 01 71 7.4 -9 685.50 -57.3 -54.4 -57.0 63 -99 SPO 1997 10 08 03 02 70 7.3 -9 685.50 -57.4 -54.4 -57.0 63 -99 SPO 1997 10 08 03 03 70 7.2 -9 685.40 -57.5 -54.6 -57.1 64 -99 SPO 1997 10 08 03 04 68 7.0 -9 685.40 -57.6 -54.7 -57.2 65 -99 SPO 1997 10 08 03 05 68 7.3 -9 685.40 -57.6 -54.8 -57.2 66 -99 SPO 1997 10 08 03 06 69 7.4 -9 685.40 -57.7 -54.8 -57.3 66 -99 SPO 1997 10 08 03 07 69 7.3 -9 685.40 -57.7 -54.7 -57.3 66 -99 SPO 1997 10 08 03 08 70 7.5 -9 685.40 -57.7 -54.8 -57.3 65 -99 SPO 1997 10 08 03 09 70 7.4 -9 685.40 -57.7 -54.7 -57.3 65 -99 SPO 1997 10 08 03 10 71 7.3 -9 685.40 -57.6 -54.8 -57.2 63 -99 SPO 1997 10 08 03 11 71 7.3 -9 685.40 -57.6 -55.0 -57.2 63 -99 SPO 1997 10 08 03 12 71 7.2 -9 685.40 -57.6 -55.0 -57.2 63 -99 SPO 1997 10 08 03 13 71 7.1 -9 685.40 -57.7 -55.2 -57.2 64 -99 SPO 1997 10 08 03 14 71 7.0 -9 685.40 -57.7 -55.2 -57.2 63 -99 SPO 1997 10 08 03 15 71 7.0 -9 685.40 -57.8 -55.3 -57.3 64 -99 SPO 1997 10 08 03 16 69 7.1 -9 685.40 -57.8 -55.0 -57.4 64 -99 SPO 1997 10 08 03 17 68 7.1 -9 685.40 -57.8 -54.8 -57.4 63 -99 SPO 1997 10 08 03 18 69 7.2 -9 685.40 -57.9 -54.7 -57.5 64 -99 SPO 1997 10 08 03 19 69 7.3 -9 685.40 -57.9 -54.5 -57.5 64 -99 SPO 1997 10 08 03 20 66 7.3 -9 685.30 -57.9 -54.7 -57.6 62 -99 SPO 1997 10 08 03 21 68 7.7 -9 685.30 -58.0 -54.4 -57.6 63 -99 SPO 1997 10 08 03 22 68 7.8 -9 685.40 -58.0 -53.9 -57.6 63 -99 SPO 1997 10 08 03 23 68 7.9 -9 685.40 -58.0 -54.2 -57.5 63 -99 SPO 1997 10 08 03 24 68 7.8 -9 685.40 -57.8 -54.2 -57.4 62 -99 SPO 1997 10 08 03 25 67 7.8 -9 685.40 -57.8 -54.3 -57.4 62 -99 SPO 1997 10 08 03 26 71 8.0 -9 685.40 -57.6 -54.1 -57.2 62 -99 SPO 1997 10 08 03 27 69 7.7 -9 685.40 -57.5 -54.4 -57.1 62 -99 SPO 1997 10 08 03 28 71 7.9 -9 685.40 -57.4 -54.3 -57.1 63 -99 SPO 1997 10 08 03 29 69 7.8 -9 685.30 -57.5 -54.4 -57.1 64 -99 SPO 1997 10 08 03 30 68 7.7 -9 685.30 -57.5 -54.6 -57.1 64 -99 SPO 1997 10 08 03 31 69 7.9 -9 685.30 -57.5 -54.3 -57.2 64 -99 SPO 1997 10 08 03 32 69 7.9 -9 685.30 -57.4 -54.2 -57.1 63 -99 SPO 1997 10 08 03 33 69 8.0 -9 685.30 -57.4 -54.4 -57.0 63 -99 SPO 1997 10 08 03 34 70 8.0 -9 685.30 -57.3 -54.4 -57.0 63 -99 SPO 1997 10 08 03 35 71 7.8 -9 685.30 -57.3 -54.5 -56.9 63 -99 SPO 1997 10 08 03 36 72 7.6 -9 685.30 -57.3 -54.6 -56.9 63 -99 SPO 1997 10 08 03 37 73 7.3 -9 685.30 -57.2 -54.8 -56.9 63 -99 SPO 1997 10 08 03 38 72 7.3 -9 685.30 -57.4 -54.8 -57.0 65 -99 SPO 1997 10 08 03 39 72 7.2 -9 685.30 -57.5 -54.6 -57.1 67 -99 SPO 1997 10 08 03 40 72 7.3 -9 685.30 -57.6 -54.5 -57.3 67 -99 SPO 1997 10 08 03 41 72 7.2 -9 685.30 -57.7 -54.6 -57.3 68 -99 SPO 1997 10 08 03 42 72 7.1 -9 685.30 -57.8 -54.6 -57.4 68 -99 SPO 1997 10 08 03 43 72 7.0 -9 685.30 -57.8 -54.4 -57.4 68 -99 SPO 1997 10 08 03 44 71 6.9 -9 685.30 -57.8 -54.7 -57.4 68 -99 SPO 1997 10 08 03 45 71 6.9 -9 685.20 -57.9 -54.6 -57.4 68 -99 SPO 1997 10 08 03 46 70 6.8 -9 685.30 -57.9 -54.5 -57.4 67 -99 SPO 1997 10 08 03 47 68 6.8 -9 685.30 -57.9 -54.4 -57.5 67 -99 SPO 1997 10 08 03 48 67 7.0 -9 685.30 -58.0 -54.3 -57.5 67 -99 SPO 1997 10 08 03 49 66 7.2 -9 685.30 -58.0 -54.1 -57.5 66 -99 SPO 1997 10 08 03 50 67 7.3 -9 685.30 -57.8 -54.1 -57.3 65 -99 SPO 1997 10 08 03 51 67 7.3 -9 685.30 -57.6 -54.1 -57.1 64 -99 SPO 1997 10 08 03 52 67 7.2 -9 685.20 -57.3 -54.3 -56.9 63 -99 SPO 1997 10 08 03 53 68 7.3 -9 685.20 -57.1 -54.4 -56.7 63 -99 SPO 1997 10 08 03 54 68 6.9 -9 685.20 -56.9 -54.4 -56.6 62 -99 SPO 1997 10 08 03 55 69 6.9 -9 685.20 -56.9 -54.6 -56.6 63 -99 SPO 1997 10 08 03 56 69 6.9 -9 685.20 -57.0 -54.7 -56.6 65 -99 SPO 1997 10 08 03 57 68 7.0 -9 685.20 -57.1 -54.6 -56.7 67 -99 SPO 1997 10 08 03 58 68 7.1 -9 685.20 -57.1 -54.5 -56.8 67 -99 SPO 1997 10 08 03 59 69 6.9 -9 685.20 -57.2 -54.5 -56.7 67 -99 SPO 1997 10 08 04 00 69 6.8 -9 685.20 -57.2 -54.4 -56.8 67 0 SPO 1997 10 08 04 01 67 7.1 -9 685.20 -57.1 -54.6 -56.6 65 -99 SPO 1997 10 08 04 02 68 6.6 -9 685.20 -56.9 -54.7 -56.5 64 -99 SPO 1997 10 08 04 03 69 6.7 -9 685.30 -56.9 -54.7 -56.6 65 -99 SPO 1997 10 08 04 04 69 7.0 -9 685.30 -57.0 -54.8 -56.7 66 -99 SPO 1997 10 08 04 05 69 7.1 -9 685.30 -56.9 -54.9 -56.6 66 -99 SPO 1997 10 08 04 06 68 7.1 -9 685.30 -57.1 -55.0 -56.7 68 -99 SPO 1997 10 08 04 07 67 7.1 -9 685.30 -57.3 -54.9 -57.0 70 -99 SPO 1997 10 08 04 08 66 7.2 -9 685.30 -57.4 -54.8 -57.1 70 -99 SPO 1997 10 08 04 09 65 7.3 -9 685.30 -57.6 -54.6 -57.2 70 -99 SPO 1997 10 08 04 10 65 7.4 -9 685.30 -57.6 -54.5 -57.2 68 -99 SPO 1997 10 08 04 11 65 7.4 -9 685.30 -57.6 -54.5 -57.2 67 -99 SPO 1997 10 08 04 12 66 7.0 -9 685.30 -57.4 -54.6 -57.0 65 -99 SPO 1997 10 08 04 13 66 6.9 -9 685.20 -57.4 -54.6 -57.0 65 -99 SPO 1997 10 08 04 14 68 6.8 -9 685.20 -57.4 -54.7 -57.1 66 -99 SPO 1997 10 08 04 15 68 6.5 -9 685.20 -57.4 -54.8 -57.1 66 -99 SPO 1997 10 08 04 16 68 6.5 -9 685.20 -57.6 -54.9 -57.2 67 -99 SPO 1997 10 08 04 17 67 6.5 -9 685.20 -57.7 -54.9 -57.3 67 -99 SPO 1997 10 08 04 18 68 6.6 -9 685.20 -57.8 -54.8 -57.4 68 -99 SPO 1997 10 08 04 19 68 6.4 -9 685.20 -57.9 -54.8 -57.5 69 -99 SPO 1997 10 08 04 20 68 6.5 -9 685.20 -58.0 -54.8 -57.6 68 -99 SPO 1997 10 08 04 21 68 6.5 -9 685.20 -58.0 -54.7 -57.6 66 -99 SPO 1997 10 08 04 22 68 6.5 -9 685.20 -58.0 -54.6 -57.6 66 -99 SPO 1997 10 08 04 23 67 6.5 -9 685.20 -58.0 -54.7 -57.6 65 -99 SPO 1997 10 08 04 24 67 6.6 -9 685.20 -57.9 -54.7 -57.5 64 -99 SPO 1997 10 08 04 25 66 6.5 -9 685.20 -57.9 -54.7 -57.5 64 -99 SPO 1997 10 08 04 26 66 6.6 -9 685.20 -57.9 -54.6 -57.5 64 -99 SPO 1997 10 08 04 27 66 6.9 -9 685.20 -57.8 -54.5 -57.5 63 -99 SPO 1997 10 08 04 28 63 7.0 -9 685.20 -57.6 -54.6 -57.3 62 -99 SPO 1997 10 08 04 29 62 7.3 -9 685.20 -57.3 -54.7 -57.0 60 -99 SPO 1997 10 08 04 30 65 7.3 -9 685.10 -57.1 -54.8 -56.9 60 -99 SPO 1997 10 08 04 31 64 7.4 -9 685.10 -57.3 -54.8 -57.1 63 -99 SPO 1997 10 08 04 32 63 7.2 -9 685.10 -57.3 -54.8 -57.2 63 -99 SPO 1997 10 08 04 33 63 7.5 -9 685.10 -57.3 -54.8 -57.2 63 -99 SPO 1997 10 08 04 34 63 7.6 -9 685.10 -57.4 -54.6 -57.3 64 -99 SPO 1997 10 08 04 35 62 7.4 -9 685.10 -57.5 -54.6 -57.3 65 -99 SPO 1997 10 08 04 36 62 7.3 -9 685.10 -57.5 -54.7 -57.3 65 -99 SPO 1997 10 08 04 37 61 7.2 -9 685.10 -57.4 -54.9 -57.3 64 -99 SPO 1997 10 08 04 38 61 7.3 -9 685.10 -57.4 -54.9 -57.3 65 -99 SPO 1997 10 08 04 39 60 7.3 -9 685.00 -57.4 -54.9 -57.3 65 -99 SPO 1997 10 08 04 40 58 7.7 -9 685.00 -57.4 -54.8 -57.4 65 -99 SPO 1997 10 08 04 41 57 7.8 -9 685.00 -57.4 -54.6 -57.3 65 -99 SPO 1997 10 08 04 42 56 8.0 -9 685.00 -57.3 -54.5 -57.2 64 -99 SPO 1997 10 08 04 43 56 7.9 -9 685.00 -57.3 -54.4 -57.2 64 -99 SPO 1997 10 08 04 44 57 7.8 -9 685.00 -57.2 -54.3 -57.1 63 -99 SPO 1997 10 08 04 45 57 7.9 -9 685.00 -57.2 -54.2 -57.1 63 -99 SPO 1997 10 08 04 46 57 7.9 -9 685.00 -57.2 -54.0 -57.1 63 -99 SPO 1997 10 08 04 47 57 7.8 -9 685.00 -57.2 -53.8 -57.2 63 -99 SPO 1997 10 08 04 48 57 7.9 -9 685.00 -57.2 -53.8 -57.1 64 -99 SPO 1997 10 08 04 49 58 7.8 -9 685.00 -57.2 -53.9 -57.1 65 -99 SPO 1997 10 08 04 50 59 7.7 -9 685.00 -57.2 -53.6 -57.1 65 -99 SPO 1997 10 08 04 51 60 7.6 -9 685.00 -57.2 -53.2 -57.1 65 -99 SPO 1997 10 08 04 52 61 7.5 -9 685.00 -57.2 -53.1 -57.1 66 -99 SPO 1997 10 08 04 53 61 7.6 -9 685.00 -57.2 -53.3 -57.2 66 -99 SPO 1997 10 08 04 54 61 7.7 -9 685.00 -57.3 -53.6 -57.2 67 -99 SPO 1997 10 08 04 55 60 7.7 -9 685.00 -57.3 -53.8 -57.2 66 -99 SPO 1997 10 08 04 56 60 7.5 -9 685.00 -57.3 -53.8 -57.2 65 -99 SPO 1997 10 08 04 57 59 7.6 -9 685.00 -57.3 -53.8 -57.2 65 -99 SPO 1997 10 08 04 58 58 7.8 -9 685.00 -57.2 -53.4 -57.2 64 -99 SPO 1997 10 08 04 59 59 7.7 -9 685.00 -57.2 -53.0 -57.1 64 -99 SPO 1997 10 08 05 00 62 7.8 -9 685.00 -57.1 -52.8 -57.1 63 0 SPO 1997 10 08 05 01 63 7.5 -9 685.00 -57.2 -53.0 -57.1 64 -99 SPO 1997 10 08 05 02 64 7.4 -9 685.00 -57.2 -53.2 -57.1 65 -99 SPO 1997 10 08 05 03 64 7.2 -9 685.00 -57.2 -53.3 -57.1 66 -99 SPO 1997 10 08 05 04 65 7.2 -9 685.00 -57.2 -53.2 -57.2 66 -99 SPO 1997 10 08 05 05 67 7.4 -9 685.00 -57.3 -53.2 -57.3 67 -99 SPO 1997 10 08 05 06 67 7.3 -9 685.00 -57.4 -53.3 -57.3 67 -99 SPO 1997 10 08 05 07 67 7.5 -9 685.00 -57.4 -53.4 -57.3 67 -99 SPO 1997 10 08 05 08 68 7.6 -9 685.00 -57.4 -53.5 -57.3 66 -99 SPO 1997 10 08 05 09 68 7.6 -9 685.00 -57.4 -53.7 -57.3 65 -99 SPO 1997 10 08 05 10 69 7.5 -9 685.00 -57.3 -53.7 -57.2 64 -99 SPO 1997 10 08 05 11 69 7.5 -9 684.90 -57.3 -53.8 -57.2 64 -99 SPO 1997 10 08 05 12 68 7.5 -9 684.90 -57.3 -53.8 -57.2 65 -99 SPO 1997 10 08 05 13 68 7.5 -9 684.90 -57.3 -53.9 -57.2 65 -99 SPO 1997 10 08 05 14 68 7.4 -9 684.90 -57.3 -54.0 -57.2 65 -99 SPO 1997 10 08 05 15 68 7.5 -9 684.90 -57.3 -54.0 -57.2 65 -99 SPO 1997 10 08 05 16 68 7.5 -9 684.90 -57.3 -53.8 -57.2 65 -99 SPO 1997 10 08 05 17 68 7.6 -9 684.90 -57.2 -53.9 -57.1 65 -99 SPO 1997 10 08 05 18 69 7.6 -9 684.90 -57.1 -54.0 -57.0 64 -99 SPO 1997 10 08 05 19 70 7.5 -9 684.90 -57.1 -54.2 -57.0 64 -99 SPO 1997 10 08 05 20 70 7.5 -9 684.90 -57.0 -54.3 -57.0 63 -99 SPO 1997 10 08 05 21 71 7.5 -9 684.90 -57.0 -54.4 -57.0 63 -99 SPO 1997 10 08 05 22 70 7.4 -9 684.90 -57.2 -54.4 -57.2 65 -99 SPO 1997 10 08 05 23 72 7.5 -9 684.80 -57.3 -54.3 -57.2 66 -99 SPO 1997 10 08 05 24 72 7.6 -9 684.80 -57.4 -54.2 -57.3 67 -99 SPO 1997 10 08 05 25 71 7.7 -9 684.80 -57.5 -54.4 -57.4 67 -99 SPO 1997 10 08 05 26 70 7.8 -9 684.80 -57.5 -54.5 -57.4 67 -99 SPO 1997 10 08 05 27 70 7.9 -9 684.80 -57.6 -54.6 -57.5 67 -99 SPO 1997 10 08 05 28 68 8.1 -9 684.80 -57.5 -54.7 -57.4 66 -99 SPO 1997 10 08 05 29 67 8.1 -9 684.80 -57.5 -54.8 -57.4 65 -99 SPO 1997 10 08 05 30 66 8.1 -9 684.80 -57.5 -54.7 -57.4 64 -99 SPO 1997 10 08 05 31 66 8.1 -9 684.70 -57.5 -54.5 -57.4 64 -99 SPO 1997 10 08 05 32 66 8.1 -9 684.70 -57.6 -54.5 -57.4 64 -99 SPO 1997 10 08 05 33 65 8.2 -9 684.70 -57.6 -54.5 -57.5 64 -99 SPO 1997 10 08 05 34 65 8.3 -9 684.70 -57.7 -54.4 -57.5 65 -99 SPO 1997 10 08 05 35 65 8.3 -9 684.70 -57.7 -54.2 -57.5 65 -99 SPO 1997 10 08 05 36 65 8.3 -9 684.70 -57.7 -54.0 -57.6 65 -99 SPO 1997 10 08 05 37 66 8.4 -9 684.70 -57.7 -54.2 -57.5 65 -99 SPO 1997 10 08 05 38 65 8.4 -9 684.70 -57.7 -54.3 -57.6 65 -99 SPO 1997 10 08 05 39 66 8.4 -9 684.70 -57.7 -54.1 -57.6 64 -99 SPO 1997 10 08 05 40 65 8.2 -9 684.70 -57.7 -54.1 -57.6 64 -99 SPO 1997 10 08 05 41 65 8.1 -9 684.70 -57.7 -54.3 -57.6 64 -99 SPO 1997 10 08 05 42 64 8.0 -9 684.70 -57.7 -54.5 -57.6 63 -99 SPO 1997 10 08 05 43 62 7.9 -9 684.70 -57.8 -54.4 -57.6 64 -99 SPO 1997 10 08 05 44 61 7.8 -9 684.70 -57.8 -53.8 -57.6 63 -99 SPO 1997 10 08 05 45 60 7.9 -9 684.70 -57.8 -53.7 -57.6 62 -99 SPO 1997 10 08 05 46 59 8.1 -9 684.70 -57.8 -53.7 -57.6 62 -99 SPO 1997 10 08 05 47 60 8.0 -9 684.70 -57.8 -53.6 -57.5 63 -99 SPO 1997 10 08 05 48 60 7.9 -9 684.70 -57.7 -53.5 -57.5 63 -99 SPO 1997 10 08 05 49 60 7.9 -9 684.70 -57.8 -53.5 -57.5 64 -99 SPO 1997 10 08 05 50 61 7.9 -9 684.70 -57.7 -53.6 -57.4 63 -99 SPO 1997 10 08 05 51 61 7.9 -9 684.70 -57.6 -53.7 -57.3 63 -99 SPO 1997 10 08 05 52 61 7.9 -9 684.70 -57.6 -53.7 -57.2 64 -99 SPO 1997 10 08 05 53 61 7.9 -9 684.70 -57.5 -53.8 -57.2 64 -99 SPO 1997 10 08 05 54 61 7.9 -9 684.70 -57.5 -53.8 -57.2 64 -99 SPO 1997 10 08 05 55 61 7.9 -9 684.70 -57.4 -53.9 -57.2 63 -99 SPO 1997 10 08 05 56 62 8.0 -9 684.70 -57.5 -54.0 -57.2 64 -99 SPO 1997 10 08 05 57 62 7.9 -9 684.70 -57.4 -54.0 -57.2 63 -99 SPO 1997 10 08 05 58 62 8.0 -9 684.70 -57.4 -54.0 -57.1 63 -99 SPO 1997 10 08 05 59 61 7.9 -9 684.70 -57.3 -54.0 -57.0 62 -99 SPO 1997 10 08 06 00 61 8.0 -9 684.70 -57.3 -54.0 -57.0 63 0 SPO 1997 10 08 06 01 61 8.2 -9 684.70 -57.4 -54.0 -57.1 64 -99 SPO 1997 10 08 06 02 59 8.1 -9 684.70 -57.4 -54.1 -57.1 65 -99 SPO 1997 10 08 06 03 60 8.0 -9 684.70 -57.3 -54.1 -57.0 64 -99 SPO 1997 10 08 06 04 61 8.0 -9 684.70 -57.4 -54.1 -57.1 66 -99 SPO 1997 10 08 06 05 61 8.0 -9 684.70 -57.5 -54.0 -57.2 67 -99 SPO 1997 10 08 06 06 61 7.8 -9 684.70 -57.5 -53.8 -57.2 66 -99 SPO 1997 10 08 06 07 60 7.8 -9 684.70 -57.6 -53.7 -57.2 67 -99 SPO 1997 10 08 06 08 59 7.8 -9 684.70 -57.6 -53.6 -57.3 65 -99 SPO 1997 10 08 06 09 58 7.8 -9 684.70 -57.6 -53.6 -57.3 65 -99 SPO 1997 10 08 06 10 58 7.6 -9 684.70 -57.6 -53.8 -57.3 64 -99 SPO 1997 10 08 06 11 58 7.7 -9 684.70 -57.6 -53.8 -57.2 64 -99 SPO 1997 10 08 06 12 59 7.7 -9 684.70 -57.5 -53.8 -57.2 63 -99 SPO 1997 10 08 06 13 58 7.8 -9 684.70 -57.5 -53.8 -57.2 63 -99 SPO 1997 10 08 06 14 58 7.8 -9 684.70 -57.5 -53.8 -57.2 64 -99 SPO 1997 10 08 06 15 58 8.0 -9 684.60 -57.6 -53.8 -57.2 66 -99 SPO 1997 10 08 06 16 59 8.0 -9 684.60 -57.5 -53.9 -57.2 65 -99 SPO 1997 10 08 06 17 59 7.9 -9 684.60 -57.5 -53.9 -57.1 65 -99 SPO 1997 10 08 06 18 59 7.7 -9 684.60 -57.4 -54.0 -57.1 64 -99 SPO 1997 10 08 06 19 59 7.6 -9 684.60 -57.5 -54.1 -57.2 65 -99 SPO 1997 10 08 06 20 58 7.7 -9 684.60 -57.6 -54.0 -57.3 65 -99 SPO 1997 10 08 06 21 57 7.7 -9 684.60 -57.7 -54.0 -57.3 66 -99 SPO 1997 10 08 06 22 57 7.8 -9 684.60 -57.7 -53.9 -57.3 66 -99 SPO 1997 10 08 06 23 57 7.8 -9 684.60 -57.7 -53.6 -57.4 66 -99 SPO 1997 10 08 06 24 56 7.9 -9 684.60 -57.8 -53.6 -57.4 67 -99 SPO 1997 10 08 06 25 57 7.8 -9 684.60 -57.8 -53.6 -57.4 67 -99 SPO 1997 10 08 06 26 57 7.6 -9 684.60 -57.8 -53.8 -57.4 67 -99 SPO 1997 10 08 06 27 58 7.5 -9 684.70 -57.8 -53.9 -57.4 67 -99 SPO 1997 10 08 06 28 57 7.3 -9 684.70 -57.8 -54.1 -57.4 67 -99 SPO 1997 10 08 06 29 55 7.2 -9 684.70 -57.7 -54.1 -57.3 65 -99 SPO 1997 10 08 06 30 55 7.6 -9 684.60 -57.7 -54.0 -57.3 64 -99 SPO 1997 10 08 06 31 55 8.0 -9 684.60 -57.6 -53.8 -57.3 63 -99 SPO 1997 10 08 06 32 54 8.3 -9 684.60 -57.5 -53.6 -57.2 63 -99 SPO 1997 10 08 06 33 53 8.5 -9 684.60 -57.4 -53.3 -57.0 63 -99 SPO 1997 10 08 06 34 52 8.5 -9 684.60 -57.2 -53.4 -56.9 62 -99 SPO 1997 10 08 06 35 53 8.4 -9 684.60 -57.1 -53.6 -56.8 63 -99 SPO 1997 10 08 06 36 53 8.3 -9 684.60 -57.0 -53.7 -56.7 63 -99 SPO 1997 10 08 06 37 53 8.2 -9 684.60 -57.0 -53.7 -56.7 64 -99 SPO 1997 10 08 06 38 54 8.3 -9 684.60 -56.9 -53.6 -56.7 64 -99 SPO 1997 10 08 06 39 53 8.1 -9 684.60 -56.9 -53.5 -56.6 65 -99 SPO 1997 10 08 06 40 53 8.0 -9 684.50 -56.9 -53.6 -56.6 65 -99 SPO 1997 10 08 06 41 54 7.8 -9 684.50 -56.8 -53.6 -56.5 64 -99 SPO 1997 10 08 06 42 54 7.7 -9 684.60 -56.7 -53.7 -56.5 64 -99 SPO 1997 10 08 06 43 55 7.6 -9 684.50 -56.7 -53.8 -56.4 64 -99 SPO 1997 10 08 06 44 56 7.6 -9 684.50 -56.7 -53.8 -56.4 64 -99 SPO 1997 10 08 06 45 55 7.5 -9 684.50 -56.7 -53.9 -56.4 65 -99 SPO 1997 10 08 06 46 54 7.3 -9 684.50 -56.8 -54.1 -56.5 67 -99 SPO 1997 10 08 06 47 55 7.5 -9 684.50 -56.9 -54.1 -56.5 68 -99 SPO 1997 10 08 06 48 53 7.9 -9 684.60 -56.8 -53.9 -56.4 68 -99 SPO 1997 10 08 06 49 52 8.0 -9 684.50 -56.5 -53.8 -56.2 65 -99 SPO 1997 10 08 06 50 51 8.1 -9 684.50 -56.3 -53.6 -56.0 64 -99 SPO 1997 10 08 06 51 51 8.3 -9 684.50 -56.1 -53.5 -55.8 64 -99 SPO 1997 10 08 06 52 52 8.3 -9 684.50 -56.0 -53.5 -55.8 63 -99 SPO 1997 10 08 06 53 52 8.2 -9 684.50 -56.0 -53.6 -55.8 63 -99 SPO 1997 10 08 06 54 53 8.2 -9 684.50 -56.0 -53.7 -55.8 64 -99 SPO 1997 10 08 06 55 53 8.3 -9 684.50 -56.0 -53.7 -55.8 64 -99 SPO 1997 10 08 06 56 53 8.1 -9 684.50 -56.0 -53.7 -55.8 65 -99 SPO 1997 10 08 06 57 53 8.2 -9 684.60 -56.0 -53.8 -55.8 65 -99 SPO 1997 10 08 06 58 53 8.4 -9 684.50 -56.0 -53.8 -55.8 65 -99 SPO 1997 10 08 06 59 52 8.2 -9 684.50 -56.0 -53.8 -55.7 66 -99 SPO 1997 10 08 07 00 52 8.2 -9 684.50 -56.0 -53.8 -55.7 66 0 SPO 1997 10 08 07 01 52 8.4 -9 684.50 -56.0 -53.8 -55.8 67 -99 SPO 1997 10 08 07 02 52 8.6 -9 684.50 -56.0 -53.8 -55.8 67 -99 SPO 1997 10 08 07 03 52 8.3 -9 684.50 -56.0 -53.9 -55.7 67 -99 SPO 1997 10 08 07 04 51 8.3 -9 684.50 -56.0 -54.0 -55.7 67 -99 SPO 1997 10 08 07 05 51 8.3 -9 684.50 -56.0 -54.0 -55.7 67 -99 SPO 1997 10 08 07 06 51 8.2 -9 684.50 -55.9 -54.0 -55.7 65 -99 SPO 1997 10 08 07 07 50 8.2 -9 684.50 -55.9 -53.8 -55.7 65 -99 SPO 1997 10 08 07 08 50 8.5 -9 684.50 -56.0 -53.6 -55.7 66 -99 SPO 1997 10 08 07 09 51 8.6 -9 684.50 -56.0 -53.5 -55.7 66 -99 SPO 1997 10 08 07 10 51 8.4 -9 684.50 -55.9 -53.5 -55.6 66 -99 SPO 1997 10 08 07 11 51 8.4 -9 684.50 -55.8 -53.5 -55.6 65 -99 SPO 1997 10 08 07 12 51 8.5 -9 684.50 -55.9 -53.4 -55.6 67 -99 SPO 1997 10 08 07 13 51 8.5 -9 684.40 -55.8 -53.4 -55.6 67 -99 SPO 1997 10 08 07 14 50 8.5 -9 684.40 -55.8 -53.4 -55.5 66 -99 SPO 1997 10 08 07 15 50 8.6 -9 684.50 -55.8 -53.4 -55.5 66 -99 SPO 1997 10 08 07 16 51 8.4 -9 684.40 -55.8 -53.4 -55.5 67 -99 SPO 1997 10 08 07 17 52 8.3 -9 684.40 -55.8 -53.4 -55.6 67 -99 SPO 1997 10 08 07 18 52 8.1 -9 684.50 -55.9 -53.5 -55.6 68 -99 SPO 1997 10 08 07 19 52 8.1 -9 684.50 -56.0 -53.5 -55.6 69 -99 SPO 1997 10 08 07 20 53 8.0 -9 684.40 -56.0 -53.4 -55.6 69 -99 SPO 1997 10 08 07 21 52 7.7 -9 684.40 -56.0 -53.5 -55.6 69 -99 SPO 1997 10 08 07 22 52 7.7 -9 684.50 -56.0 -53.4 -55.7 69 -99 SPO 1997 10 08 07 23 53 7.9 -9 684.40 -56.0 -53.4 -55.7 69 -99 SPO 1997 10 08 07 24 52 8.1 -9 684.40 -56.1 -53.4 -55.8 69 -99 SPO 1997 10 08 07 25 52 8.5 -9 684.40 -56.1 -53.1 -55.8 69 -99 SPO 1997 10 08 07 26 52 8.6 -9 684.40 -56.0 -53.0 -55.7 68 -99 SPO 1997 10 08 07 27 52 8.6 -9 684.40 -56.0 -53.0 -55.7 67 -99 SPO 1997 10 08 07 28 53 8.3 -9 684.40 -56.0 -53.0 -55.6 67 -99 SPO 1997 10 08 07 29 53 8.1 -9 684.50 -55.9 -53.1 -55.6 66 -99 SPO 1997 10 08 07 30 53 7.7 -9 684.50 -55.8 -53.3 -55.5 65 -99 SPO 1997 10 08 07 31 53 7.4 -9 684.50 -55.9 -53.4 -55.6 66 -99 SPO 1997 10 08 07 32 54 7.5 -9 684.50 -56.1 -53.5 -55.7 69 -99 SPO 1997 10 08 07 33 54 7.4 -9 684.50 -56.1 -53.5 -55.7 69 -99 SPO 1997 10 08 07 34 54 7.3 -9 684.50 -56.2 -53.5 -55.7 69 -99 SPO 1997 10 08 07 35 54 7.4 -9 684.50 -56.2 -53.6 -55.8 69 -99 SPO 1997 10 08 07 36 54 7.4 -9 684.50 -56.2 -53.6 -55.7 69 -99 SPO 1997 10 08 07 37 55 7.4 -9 684.50 -56.1 -53.6 -55.7 68 -99 SPO 1997 10 08 07 38 55 7.4 -9 684.50 -56.1 -53.6 -55.8 68 -99 SPO 1997 10 08 07 39 56 7.4 -9 684.50 -56.1 -53.7 -55.8 67 -99 SPO 1997 10 08 07 40 56 7.3 -9 684.50 -56.1 -53.9 -55.7 67 -99 SPO 1997 10 08 07 41 57 7.6 -9 684.50 -56.1 -53.9 -55.8 67 -99 SPO 1997 10 08 07 42 56 7.5 -9 684.50 -56.1 -53.9 -55.7 67 -99 SPO 1997 10 08 07 43 58 7.5 -9 684.50 -56.1 -53.9 -55.8 67 -99 SPO 1997 10 08 07 44 59 7.6 -9 684.50 -56.1 -53.8 -55.8 67 -99 SPO 1997 10 08 07 45 58 7.4 -9 684.50 -56.1 -54.0 -55.8 66 -99 SPO 1997 10 08 07 46 59 7.3 -9 684.50 -56.2 -54.1 -55.8 67 -99 SPO 1997 10 08 07 47 60 7.4 -9 684.40 -56.2 -54.2 -55.8 67 -99 SPO 1997 10 08 07 48 60 7.5 -9 684.50 -56.3 -54.2 -55.9 68 -99 SPO 1997 10 08 07 49 60 7.5 -9 684.40 -56.3 -54.2 -55.9 67 -99 SPO 1997 10 08 07 50 60 7.3 -9 684.40 -56.4 -54.2 -56.0 67 -99 SPO 1997 10 08 07 51 58 7.4 -9 684.40 -56.4 -54.2 -56.1 66 -99 SPO 1997 10 08 07 52 57 7.5 -9 684.40 -56.5 -54.2 -56.1 66 -99 SPO 1997 10 08 07 53 56 7.8 -9 684.40 -56.5 -53.9 -56.1 66 -99 SPO 1997 10 08 07 54 56 8.0 -9 684.40 -56.5 -53.6 -56.1 66 -99 SPO 1997 10 08 07 55 55 8.2 -9 684.40 -56.4 -53.4 -56.1 64 -99 SPO 1997 10 08 07 56 54 8.6 -9 684.30 -56.3 -53.4 -56.0 64 -99 SPO 1997 10 08 07 57 53 8.6 -9 684.30 -56.1 -53.3 -55.8 63 -99 SPO 1997 10 08 07 58 54 8.7 -9 684.30 -56.0 -53.3 -55.6 63 -99 SPO 1997 10 08 07 59 55 8.8 -9 684.30 -55.9 -53.3 -55.6 63 -99 SPO 1997 10 08 08 00 56 8.6 -9 684.30 -55.8 -53.3 -55.6 63 0 SPO 1997 10 08 08 01 55 8.5 -9 684.30 -56.0 -53.4 -55.7 65 -99 SPO 1997 10 08 08 02 56 8.5 -9 684.40 -56.1 -53.5 -55.8 65 -99 SPO 1997 10 08 08 03 56 8.4 -9 684.40 -56.1 -53.6 -55.9 65 -99 SPO 1997 10 08 08 04 56 8.3 -9 684.30 -56.2 -53.5 -55.9 66 -99 SPO 1997 10 08 08 05 57 8.3 -9 684.40 -56.2 -53.4 -55.9 66 -99 SPO 1997 10 08 08 06 58 8.1 -9 684.40 -56.3 -53.4 -56.0 67 -99 SPO 1997 10 08 08 07 59 8.1 -9 684.30 -56.3 -53.4 -56.0 67 -99 SPO 1997 10 08 08 08 60 7.8 -9 684.40 -56.3 -53.6 -56.0 66 -99 SPO 1997 10 08 08 09 60 7.9 -9 684.40 -56.4 -53.6 -56.1 67 -99 SPO 1997 10 08 08 10 60 7.7 -9 684.40 -56.5 -53.7 -56.2 67 -99 SPO 1997 10 08 08 11 61 7.6 -9 684.40 -56.6 -53.8 -56.2 68 -99 SPO 1997 10 08 08 12 61 7.6 -9 684.40 -56.7 -53.8 -56.3 68 -99 SPO 1997 10 08 08 13 61 7.3 -9 684.40 -56.7 -53.8 -56.3 67 -99 SPO 1997 10 08 08 14 61 7.3 -9 684.40 -56.8 -53.7 -56.4 67 -99 SPO 1997 10 08 08 15 61 7.3 -9 684.50 -56.8 -53.6 -56.4 67 -99 SPO 1997 10 08 08 16 60 7.2 -9 684.50 -56.8 -53.7 -56.4 66 -99 SPO 1997 10 08 08 17 60 7.0 -9 684.50 -56.8 -53.7 -56.4 66 -99 SPO 1997 10 08 08 18 60 6.8 -9 684.50 -56.9 -53.6 -56.4 67 -99 SPO 1997 10 08 08 19 61 6.8 -9 684.50 -56.9 -53.8 -56.4 67 -99 SPO 1997 10 08 08 20 61 6.8 -9 684.60 -56.9 -53.9 -56.4 67 -99 SPO 1997 10 08 08 21 62 6.8 -9 684.60 -57.0 -53.9 -56.5 68 -99 SPO 1997 10 08 08 22 63 6.6 -9 684.60 -57.0 -53.9 -56.5 68 -99 SPO 1997 10 08 08 23 62 6.4 -9 684.60 -57.0 -54.0 -56.6 67 -99 SPO 1997 10 08 08 24 62 6.4 -9 684.60 -57.0 -54.1 -56.6 67 -99 SPO 1997 10 08 08 25 62 6.3 -9 684.60 -57.1 -54.1 -56.6 66 -99 SPO 1997 10 08 08 26 62 6.5 -9 684.60 -57.1 -54.0 -56.6 65 -99 SPO 1997 10 08 08 27 63 6.7 -9 684.60 -57.1 -53.9 -56.6 65 -99 SPO 1997 10 08 08 28 63 6.7 -9 684.60 -57.0 -53.8 -56.6 64 -99 SPO 1997 10 08 08 29 63 6.8 -9 684.60 -57.0 -53.8 -56.6 64 -99 SPO 1997 10 08 08 30 63 7.0 -9 684.60 -57.0 -53.7 -56.6 64 -99 SPO 1997 10 08 08 31 64 7.1 -9 684.60 -57.1 -53.6 -56.7 65 -99 SPO 1997 10 08 08 32 64 7.4 -9 684.60 -57.2 -53.6 -56.8 65 -99 SPO 1997 10 08 08 33 64 7.5 -9 684.50 -57.2 -53.6 -56.8 65 -99 SPO 1997 10 08 08 34 65 7.6 -9 684.50 -57.2 -53.5 -56.8 65 -99 SPO 1997 10 08 08 35 65 7.8 -9 684.50 -57.3 -53.4 -56.9 66 -99 SPO 1997 10 08 08 36 65 7.8 -9 684.50 -57.3 -53.3 -56.9 65 -99 SPO 1997 10 08 08 37 66 7.7 -9 684.50 -57.2 -53.4 -56.9 64 -99 SPO 1997 10 08 08 38 67 7.7 -9 684.50 -57.2 -53.4 -56.9 64 -99 SPO 1997 10 08 08 39 67 7.8 -9 684.50 -57.3 -53.5 -56.9 65 -99 SPO 1997 10 08 08 40 67 7.7 -9 684.50 -57.4 -53.5 -56.9 66 -99 SPO 1997 10 08 08 41 68 7.6 -9 684.50 -57.3 -53.6 -56.9 65 -99 SPO 1997 10 08 08 42 69 7.5 -9 684.50 -57.3 -53.6 -56.9 65 -99 SPO 1997 10 08 08 43 69 7.3 -9 684.50 -57.3 -53.7 -56.9 65 -99 SPO 1997 10 08 08 44 69 7.2 -9 684.50 -57.3 -53.7 -56.9 65 -99 SPO 1997 10 08 08 45 68 7.3 -9 684.50 -57.3 -53.7 -56.8 66 -99 SPO 1997 10 08 08 46 68 7.4 -9 684.50 -57.2 -53.7 -56.8 65 -99 SPO 1997 10 08 08 47 66 7.4 -9 684.50 -57.2 -53.7 -56.8 64 -99 SPO 1997 10 08 08 48 66 7.3 -9 684.50 -57.2 -53.8 -56.8 64 -99 SPO 1997 10 08 08 49 66 7.2 -9 684.50 -57.2 -53.8 -56.7 64 -99 SPO 1997 10 08 08 50 66 7.4 -9 684.50 -57.2 -53.8 -56.7 64 -99 SPO 1997 10 08 08 51 66 7.3 -9 684.50 -57.1 -53.7 -56.7 63 -99 SPO 1997 10 08 08 52 65 7.3 -9 684.50 -57.2 -53.6 -56.8 65 -99 SPO 1997 10 08 08 53 65 7.4 -9 684.50 -57.2 -53.5 -56.8 65 -99 SPO 1997 10 08 08 54 65 7.4 -9 684.40 -57.2 -53.5 -56.8 65 -99 SPO 1997 10 08 08 55 65 7.4 -9 684.40 -57.3 -53.5 -56.8 67 -99 SPO 1997 10 08 08 56 65 7.3 -9 684.40 -57.3 -53.5 -56.9 66 -99 SPO 1997 10 08 08 57 65 7.3 -9 684.40 -57.3 -53.4 -56.9 67 -99 SPO 1997 10 08 08 58 66 7.3 -9 684.40 -57.3 -53.4 -56.8 66 -99 SPO 1997 10 08 08 59 67 7.3 -9 684.40 -57.4 -53.4 -57.0 67 -99 SPO 1997 10 08 09 00 68 7.1 -9 684.40 -57.4 -53.5 -57.0 66 0 SPO 1997 10 08 09 01 69 7.0 -9 684.40 -57.5 -53.6 -57.0 66 -99 SPO 1997 10 08 09 02 71 6.8 -9 684.40 -57.6 -53.7 -57.1 66 -99 SPO 1997 10 08 09 03 71 6.8 -9 684.40 -57.7 -53.8 -57.1 66 -99 SPO 1997 10 08 09 04 71 6.7 -9 684.50 -57.8 -53.8 -57.2 67 -99 SPO 1997 10 08 09 05 70 6.7 -9 684.50 -57.8 -53.9 -57.2 67 -99 SPO 1997 10 08 09 06 70 6.5 -9 684.50 -57.8 -54.0 -57.2 67 -99 SPO 1997 10 08 09 07 70 6.4 -9 684.50 -57.7 -54.2 -57.2 66 -99 SPO 1997 10 08 09 08 68 6.4 -9 684.50 -57.7 -54.2 -57.1 66 -99 SPO 1997 10 08 09 09 68 6.6 -9 684.50 -57.6 -54.1 -57.0 65 -99 SPO 1997 10 08 09 10 67 6.9 -9 684.40 -57.6 -54.1 -57.0 65 -99 SPO 1997 10 08 09 11 66 7.2 -9 684.40 -57.4 -54.0 -56.9 63 -99 SPO 1997 10 08 09 12 66 7.3 -9 684.40 -57.3 -54.0 -56.9 63 -99 SPO 1997 10 08 09 13 65 7.5 -9 684.30 -57.3 -54.0 -56.9 63 -99 SPO 1997 10 08 09 14 64 7.6 -9 684.30 -57.3 -53.8 -56.9 63 -99 SPO 1997 10 08 09 15 63 7.9 -9 684.30 -57.4 -53.8 -57.0 65 -99 SPO 1997 10 08 09 16 64 7.9 -9 684.30 -57.4 -53.8 -57.0 65 -99 SPO 1997 10 08 09 17 63 8.0 -9 684.30 -57.4 -53.8 -57.0 65 -99 SPO 1997 10 08 09 18 63 7.9 -9 684.30 -57.4 -53.8 -56.9 65 -99 SPO 1997 10 08 09 19 62 7.9 -9 684.30 -57.3 -53.7 -56.9 65 -99 SPO 1997 10 08 09 20 62 7.9 -9 684.30 -57.3 -53.7 -56.9 65 -99 SPO 1997 10 08 09 21 62 7.9 -9 684.30 -57.3 -53.7 -56.9 66 -99 SPO 1997 10 08 09 22 62 7.7 -9 684.30 -57.2 -53.8 -56.8 65 -99 SPO 1997 10 08 09 23 62 7.8 -9 684.30 -57.2 -53.8 -56.7 65 -99 SPO 1997 10 08 09 24 62 7.8 -9 684.30 -57.0 -53.8 -56.6 63 -99 SPO 1997 10 08 09 25 61 7.9 -9 684.30 -57.0 -53.8 -56.6 63 -99 SPO 1997 10 08 09 26 60 7.9 -9 684.30 -56.9 -53.8 -56.5 63 -99 SPO 1997 10 08 09 27 60 8.1 -9 684.30 -56.8 -53.7 -56.4 64 -99 SPO 1997 10 08 09 28 60 8.0 -9 684.30 -56.7 -53.7 -56.3 64 -99 SPO 1997 10 08 09 29 61 7.8 -9 684.30 -56.6 -53.6 -56.3 64 -99 SPO 1997 10 08 09 30 61 7.8 -9 684.20 -56.6 -53.6 -56.3 65 -99 SPO 1997 10 08 09 31 60 7.8 -9 684.20 -56.6 -53.6 -56.2 66 -99 SPO 1997 10 08 09 32 60 8.1 -9 684.20 -56.5 -53.6 -56.1 66 -99 SPO 1997 10 08 09 33 59 8.0 -9 684.20 -56.4 -53.7 -56.0 65 -99 SPO 1997 10 08 09 34 60 8.1 -9 684.20 -56.3 -53.7 -56.0 64 -99 SPO 1997 10 08 09 35 61 8.1 -9 684.20 -56.3 -53.8 -56.0 64 -99 SPO 1997 10 08 09 36 61 8.0 -9 684.20 -56.4 -53.9 -56.1 65 -99 SPO 1997 10 08 09 37 60 7.9 -9 684.20 -56.6 -54.0 -56.2 67 -99 SPO 1997 10 08 09 38 61 7.7 -9 684.20 -56.8 -54.0 -56.4 68 -99 SPO 1997 10 08 09 39 61 7.6 -9 684.20 -56.9 -54.1 -56.5 69 -99 SPO 1997 10 08 09 40 60 7.6 -9 684.20 -57.0 -54.1 -56.6 69 -99 SPO 1997 10 08 09 41 58 7.8 -9 684.20 -57.0 -54.1 -56.6 68 -99 SPO 1997 10 08 09 42 59 7.8 -9 684.10 -57.0 -54.0 -56.5 68 -99 SPO 1997 10 08 09 43 58 8.0 -9 684.10 -56.9 -54.0 -56.5 67 -99 SPO 1997 10 08 09 44 57 7.8 -9 684.10 -56.9 -54.0 -56.5 67 -99 SPO 1997 10 08 09 45 57 8.1 -9 684.10 -56.9 -53.9 -56.5 67 -99 SPO 1997 10 08 09 46 57 8.3 -9 684.10 -56.9 -53.8 -56.5 66 -99 SPO 1997 10 08 09 47 57 8.3 -9 684.10 -56.8 -53.9 -56.4 65 -99 SPO 1997 10 08 09 48 57 8.3 -9 684.10 -56.8 -53.9 -56.4 64 -99 SPO 1997 10 08 09 49 57 8.2 -9 684.10 -56.8 -53.9 -56.4 64 -99 SPO 1997 10 08 09 50 56 8.2 -9 684.00 -56.9 -54.0 -56.5 64 -99 SPO 1997 10 08 09 51 56 8.2 -9 684.00 -56.9 -54.0 -56.5 64 -99 SPO 1997 10 08 09 52 56 8.2 -9 684.00 -56.9 -54.1 -56.5 66 -99 SPO 1997 10 08 09 53 55 8.2 -9 684.00 -56.9 -54.0 -56.5 66 -99 SPO 1997 10 08 09 54 54 8.4 -9 684.00 -56.9 -53.8 -56.5 67 -99 SPO 1997 10 08 09 55 53 8.6 -9 684.00 -56.9 -53.7 -56.5 67 -99 SPO 1997 10 08 09 56 52 8.7 -9 684.00 -56.8 -53.6 -56.5 67 -99 SPO 1997 10 08 09 57 53 8.6 -9 684.00 -56.8 -53.5 -56.4 67 -99 SPO 1997 10 08 09 58 53 8.5 -9 684.00 -56.7 -53.6 -56.4 66 -99 SPO 1997 10 08 09 59 53 8.5 -9 684.10 -56.7 -53.6 -56.4 66 -99 SPO 1997 10 08 10 00 53 8.4 -9 684.10 -56.7 -53.6 -56.4 66 0 SPO 1997 10 08 10 01 54 8.4 -9 684.10 -56.7 -53.6 -56.4 66 -99 SPO 1997 10 08 10 02 54 8.6 -9 684.00 -56.7 -53.5 -56.4 66 -99 SPO 1997 10 08 10 03 55 8.4 -9 684.00 -56.6 -53.6 -56.3 66 -99 SPO 1997 10 08 10 04 56 8.4 -9 684.00 -56.6 -53.5 -56.2 67 -99 SPO 1997 10 08 10 05 56 8.2 -9 684.10 -56.6 -53.6 -56.2 67 -99 SPO 1997 10 08 10 06 57 8.0 -9 684.00 -56.6 -53.6 -56.2 67 -99 SPO 1997 10 08 10 07 57 7.9 -9 684.00 -56.6 -53.7 -56.2 67 -99 SPO 1997 10 08 10 08 57 7.6 -9 684.10 -56.6 -53.9 -56.2 67 -99 SPO 1997 10 08 10 09 57 7.3 -9 684.10 -56.6 -54.1 -56.2 67 -99 SPO 1997 10 08 10 10 58 7.3 -9 684.10 -56.7 -54.1 -56.3 67 -99 SPO 1997 10 08 10 11 57 7.3 -9 684.10 -56.7 -54.0 -56.3 66 -99 SPO 1997 10 08 10 12 58 7.3 -9 684.10 -56.8 -54.0 -56.4 67 -99 SPO 1997 10 08 10 13 58 7.2 -9 684.00 -56.7 -54.0 -56.3 66 -99 SPO 1997 10 08 10 14 58 7.2 -9 684.00 -56.6 -54.1 -56.2 65 -99 SPO 1997 10 08 10 15 57 7.3 -9 684.00 -56.6 -54.1 -56.2 66 -99 SPO 1997 10 08 10 16 58 7.2 -9 684.00 -56.6 -54.0 -56.2 66 -99 SPO 1997 10 08 10 17 58 7.5 -9 684.00 -56.7 -54.0 -56.2 67 -99 SPO 1997 10 08 10 18 57 7.8 -9 684.00 -56.6 -54.0 -56.2 67 -99 SPO 1997 10 08 10 19 57 7.7 -9 684.00 -56.5 -54.0 -56.1 66 -99 SPO 1997 10 08 10 20 57 7.8 -9 684.00 -56.5 -54.0 -56.1 67 -99 SPO 1997 10 08 10 21 57 7.9 -9 683.90 -56.4 -53.9 -56.0 65 -99 SPO 1997 10 08 10 22 58 8.1 -9 683.90 -56.4 -53.9 -56.0 65 -99 SPO 1997 10 08 10 23 58 8.0 -9 683.90 -56.4 -53.9 -56.0 64 -99 SPO 1997 10 08 10 24 58 7.7 -9 684.00 -56.4 -54.0 -56.0 64 -99 SPO 1997 10 08 10 25 59 7.6 -9 684.00 -56.5 -54.0 -56.1 66 -99 SPO 1997 10 08 10 26 59 7.2 -9 684.00 -56.4 -54.2 -56.0 65 -99 SPO 1997 10 08 10 27 59 7.1 -9 684.00 -56.4 -54.2 -56.1 66 -99 SPO 1997 10 08 10 28 59 7.0 -9 684.00 -56.4 -54.2 -56.1 66 -99 SPO 1997 10 08 10 29 60 6.9 -9 684.00 -56.4 -54.3 -56.1 66 -99 SPO 1997 10 08 10 30 61 6.8 -9 684.00 -56.5 -54.3 -56.1 67 -99 SPO 1997 10 08 10 31 61 6.8 -9 684.00 -56.6 -54.3 -56.2 68 -99 SPO 1997 10 08 10 32 61 6.7 -9 684.10 -56.6 -54.3 -56.2 67 -99 SPO 1997 10 08 10 33 61 6.5 -9 684.10 -56.6 -54.3 -56.1 66 -99 SPO 1997 10 08 10 34 62 6.5 -9 684.10 -56.6 -54.3 -56.2 66 -99 SPO 1997 10 08 10 35 61 6.5 -9 684.10 -56.6 -54.3 -56.1 66 -99 SPO 1997 10 08 10 36 60 6.4 -9 684.10 -56.6 -54.3 -56.1 66 -99 SPO 1997 10 08 10 37 60 6.3 -9 684.00 -56.6 -54.4 -56.1 66 -99 SPO 1997 10 08 10 38 59 6.4 -9 684.00 -56.5 -54.4 -56.1 65 -99 SPO 1997 10 08 10 39 58 6.5 -9 684.00 -56.6 -54.3 -56.1 66 -99 SPO 1997 10 08 10 40 56 6.4 -9 684.00 -56.5 -54.3 -56.1 65 -99 SPO 1997 10 08 10 41 56 6.5 -9 684.00 -56.5 -54.2 -56.0 65 -99 SPO 1997 10 08 10 42 56 6.7 -9 684.00 -56.4 -54.2 -56.0 65 -99 SPO 1997 10 08 10 43 56 6.7 -9 683.90 -56.4 -54.1 -56.0 65 -99 SPO 1997 10 08 10 44 56 6.8 -9 683.90 -56.4 -54.1 -56.0 65 -99 SPO 1997 10 08 10 45 56 6.7 -9 683.90 -56.4 -54.0 -55.9 64 -99 SPO 1997 10 08 10 46 57 6.6 -9 684.00 -56.4 -54.1 -55.9 64 -99 SPO 1997 10 08 10 47 57 6.4 -9 684.00 -56.3 -54.1 -55.9 64 -99 SPO 1997 10 08 10 48 57 6.2 -9 684.00 -56.3 -54.2 -55.9 64 -99 SPO 1997 10 08 10 49 57 6.1 -9 684.00 -56.4 -54.2 -56.0 65 -99 SPO 1997 10 08 10 50 58 6.2 -9 684.00 -56.4 -54.2 -56.0 66 -99 SPO 1997 10 08 10 51 58 6.3 -9 684.00 -56.5 -54.2 -56.0 67 -99 SPO 1997 10 08 10 52 58 6.5 -9 683.90 -56.5 -54.2 -56.0 67 -99 SPO 1997 10 08 10 53 58 6.5 -9 683.90 -56.5 -54.1 -56.1 67 -99 SPO 1997 10 08 10 54 57 6.7 -9 683.90 -56.5 -54.0 -56.0 67 -99 SPO 1997 10 08 10 55 57 6.7 -9 683.90 -56.5 -54.0 -56.0 66 -99 SPO 1997 10 08 10 56 56 6.8 -9 683.90 -56.5 -54.0 -56.0 65 -99 SPO 1997 10 08 10 57 56 6.7 -9 683.90 -56.4 -54.0 -56.0 64 -99 SPO 1997 10 08 10 58 55 6.6 -9 683.90 -56.5 -54.0 -56.0 65 -99 SPO 1997 10 08 10 59 56 6.6 -9 683.90 -56.5 -54.0 -56.0 65 -99 SPO 1997 10 08 11 00 55 6.6 -9 683.90 -56.5 -54.0 -56.1 66 0 SPO 1997 10 08 11 01 55 6.7 -9 683.90 -56.5 -54.0 -56.0 66 -99 SPO 1997 10 08 11 02 55 6.6 -9 683.90 -56.5 -54.0 -56.0 66 -99 SPO 1997 10 08 11 03 56 6.8 -9 683.90 -56.6 -54.0 -56.1 67 -99 SPO 1997 10 08 11 04 56 6.8 -9 683.80 -56.5 -54.0 -56.0 66 -99 SPO 1997 10 08 11 05 55 6.8 -9 683.80 -56.5 -54.0 -56.0 66 -99 SPO 1997 10 08 11 06 55 7.1 -9 683.80 -56.4 -54.0 -56.0 65 -99 SPO 1997 10 08 11 07 54 7.3 -9 683.80 -56.4 -53.9 -55.9 65 -99 SPO 1997 10 08 11 08 54 7.6 -9 683.70 -56.2 -53.7 -55.8 64 -99 SPO 1997 10 08 11 09 54 7.8 -9 683.70 -56.2 -53.7 -55.8 64 -99 SPO 1997 10 08 11 10 54 7.9 -9 683.70 -56.1 -53.6 -55.7 64 -99 SPO 1997 10 08 11 11 54 7.9 -9 683.70 -56.0 -53.6 -55.6 64 -99 SPO 1997 10 08 11 12 53 8.2 -9 683.70 -56.1 -53.6 -55.7 65 -99 SPO 1997 10 08 11 13 53 8.1 -9 683.70 -56.1 -53.6 -55.7 66 -99 SPO 1997 10 08 11 14 52 8.3 -9 683.70 -56.1 -53.6 -55.7 67 -99 SPO 1997 10 08 11 15 52 8.3 -9 683.70 -56.0 -53.6 -55.7 67 -99 SPO 1997 10 08 11 16 52 8.2 -9 683.70 -56.0 -53.5 -55.6 67 -99 SPO 1997 10 08 11 17 51 8.4 -9 683.70 -56.1 -53.5 -55.7 68 -99 SPO 1997 10 08 11 18 51 8.6 -9 683.70 -56.0 -53.4 -55.7 68 -99 SPO 1997 10 08 11 19 51 8.4 -9 683.60 -56.0 -53.3 -55.7 67 -99 SPO 1997 10 08 11 20 51 8.5 -9 683.70 -56.1 -53.3 -55.7 68 -99 SPO 1997 10 08 11 21 51 8.6 -9 683.70 -56.0 -53.3 -55.6 67 -99 SPO 1997 10 08 11 22 52 8.8 -9 683.60 -56.0 -53.3 -55.6 67 -99 SPO 1997 10 08 11 23 52 8.8 -9 683.60 -56.0 -53.3 -55.7 67 -99 SPO 1997 10 08 11 24 52 8.6 -9 683.60 -56.0 -53.3 -55.7 67 -99 SPO 1997 10 08 11 25 52 8.6 -9 683.70 -56.1 -53.3 -55.8 69 -99 SPO 1997 10 08 11 26 52 8.6 -9 683.70 -56.1 -53.4 -55.8 69 -99 SPO 1997 10 08 11 27 52 8.6 -9 683.70 -56.1 -53.4 -55.7 69 -99 SPO 1997 10 08 11 28 52 8.5 -9 683.60 -56.1 -53.4 -55.7 69 -99 SPO 1997 10 08 11 29 51 8.5 -9 683.60 -56.1 -53.4 -55.8 69 -99 SPO 1997 10 08 11 30 52 8.4 -9 683.60 -56.2 -53.4 -55.8 70 -99 SPO 1997 10 08 11 31 51 8.3 -9 683.60 -56.1 -53.4 -55.8 69 -99 SPO 1997 10 08 11 32 51 8.2 -9 683.60 -56.1 -53.4 -55.7 69 -99 SPO 1997 10 08 11 33 51 8.1 -9 683.70 -56.1 -53.4 -55.8 69 -99 SPO 1997 10 08 11 34 51 8.0 -9 683.70 -56.1 -53.4 -55.7 69 -99 SPO 1997 10 08 11 35 51 8.0 -9 683.60 -56.1 -53.3 -55.8 69 -99 SPO 1997 10 08 11 36 51 8.1 -9 683.60 -56.1 -53.3 -55.7 69 -99 SPO 1997 10 08 11 37 52 8.1 -9 683.60 -56.1 -53.3 -55.7 69 -99 SPO 1997 10 08 11 38 52 8.1 -9 683.60 -56.2 -53.2 -55.8 69 -99 SPO 1997 10 08 11 39 52 8.1 -9 683.60 -56.2 -53.2 -55.8 69 -99 SPO 1997 10 08 11 40 51 8.3 -9 683.60 -56.1 -53.2 -55.7 69 -99 SPO 1997 10 08 11 41 51 8.3 -9 683.50 -56.1 -53.1 -55.7 69 -99 SPO 1997 10 08 11 42 51 8.5 -9 683.50 -56.1 -53.1 -55.7 69 -99 SPO 1997 10 08 11 43 52 8.5 -9 683.50 -56.0 -53.0 -55.6 68 -99 SPO 1997 10 08 11 44 53 8.4 -9 683.50 -56.0 -53.0 -55.6 67 -99 SPO 1997 10 08 11 45 53 8.4 -9 683.50 -55.9 -53.0 -55.5 66 -99 SPO 1997 10 08 11 46 53 8.5 -9 683.50 -55.9 -53.0 -55.6 67 -99 SPO 1997 10 08 11 47 53 8.6 -9 683.40 -55.9 -53.0 -55.5 68 -99 SPO 1997 10 08 11 48 54 8.6 -9 683.40 -55.9 -53.0 -55.5 68 -99 SPO 1997 10 08 11 49 53 8.7 -9 683.40 -55.9 -53.0 -55.6 69 -99 SPO 1997 10 08 11 50 53 8.7 -9 683.40 -55.9 -53.0 -55.5 69 -99 SPO 1997 10 08 11 51 53 8.6 -9 683.40 -55.8 -52.9 -55.5 69 -99 SPO 1997 10 08 11 52 53 8.3 -9 683.40 -55.8 -52.9 -55.5 70 -99 SPO 1997 10 08 11 53 53 8.3 -9 683.40 -55.8 -52.9 -55.5 70 -99 SPO 1997 10 08 11 54 54 8.2 -9 683.40 -55.8 -52.9 -55.4 69 -99 SPO 1997 10 08 11 55 55 8.0 -9 683.50 -55.8 -53.0 -55.4 69 -99 SPO 1997 10 08 11 56 56 7.7 -9 683.50 -55.8 -53.1 -55.5 69 -99 SPO 1997 10 08 11 57 56 7.6 -9 683.50 -55.8 -53.2 -55.5 68 -99 SPO 1997 10 08 11 58 56 7.6 -9 683.40 -55.8 -53.3 -55.4 68 -99 SPO 1997 10 08 11 59 55 7.5 -9 683.40 -55.8 -53.3 -55.4 69 -99 SPO 1997 10 08 12 00 55 7.4 -9 683.40 -55.8 -53.2 -55.4 68 0 SPO 1997 10 08 12 01 55 7.2 -9 683.40 -55.8 -53.3 -55.4 68 -99 SPO 1997 10 08 12 02 54 7.1 -9 683.40 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 12 03 54 7.1 -9 683.40 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 12 04 54 7.3 -9 683.40 -55.8 -53.4 -55.4 70 -99 SPO 1997 10 08 12 05 54 7.3 -9 683.40 -55.7 -53.3 -55.4 68 -99 SPO 1997 10 08 12 06 53 7.5 -9 683.40 -55.7 -53.2 -55.3 68 -99 SPO 1997 10 08 12 07 52 7.7 -9 683.40 -55.6 -53.2 -55.2 67 -99 SPO 1997 10 08 12 08 52 8.0 -9 683.40 -55.4 -53.1 -55.1 65 -99 SPO 1997 10 08 12 09 52 8.0 -9 683.40 -55.4 -53.0 -55.0 65 -99 SPO 1997 10 08 12 10 51 8.2 -9 683.40 -55.3 -52.9 -55.0 66 -99 SPO 1997 10 08 12 11 51 8.5 -9 683.30 -55.2 -52.8 -54.9 66 -99 SPO 1997 10 08 12 12 51 8.5 -9 683.30 -55.1 -52.8 -54.9 66 -99 SPO 1997 10 08 12 13 50 8.7 -9 683.30 -55.1 -52.8 -54.8 67 -99 SPO 1997 10 08 12 14 50 8.8 -9 683.30 -55.0 -52.7 -54.8 67 -99 SPO 1997 10 08 12 15 50 8.7 -9 683.30 -54.9 -52.7 -54.8 67 -99 SPO 1997 10 08 12 16 50 8.6 -9 683.30 -54.9 -52.7 -54.7 68 -99 SPO 1997 10 08 12 17 51 8.6 -9 683.30 -54.9 -52.8 -54.8 68 -99 SPO 1997 10 08 12 18 51 8.6 -9 683.30 -54.8 -52.8 -54.7 67 -99 SPO 1997 10 08 12 19 51 8.4 -9 683.30 -54.9 -52.9 -54.7 70 -99 SPO 1997 10 08 12 20 52 8.4 -9 683.30 -54.9 -52.9 -54.8 68 -99 SPO 1997 10 08 12 21 51 8.6 -9 683.30 -54.9 -52.9 -54.8 68 -99 SPO 1997 10 08 12 22 51 8.6 -9 683.30 -54.9 -52.8 -54.7 70 -99 SPO 1997 10 08 12 23 51 8.6 -9 683.30 -54.8 -52.8 -54.7 70 -99 SPO 1997 10 08 12 24 52 8.4 -9 683.30 -54.8 -52.9 -54.7 70 -99 SPO 1997 10 08 12 25 51 8.3 -9 683.30 -54.8 -52.9 -54.7 70 -99 SPO 1997 10 08 12 26 52 8.3 -9 683.30 -54.9 -52.9 -54.7 71 -99 SPO 1997 10 08 12 27 51 8.3 -9 683.30 -54.9 -52.9 -54.7 71 -99 SPO 1997 10 08 12 28 51 7.9 -9 683.40 -54.8 -52.9 -54.7 71 -99 SPO 1997 10 08 12 29 52 7.7 -9 683.40 -54.8 -53.0 -54.7 70 -99 SPO 1997 10 08 12 30 53 7.3 -9 683.40 -54.9 -53.1 -54.8 71 -99 SPO 1997 10 08 12 31 54 7.2 -9 683.40 -55.0 -53.2 -54.9 71 -99 SPO 1997 10 08 12 32 55 7.2 -9 683.40 -55.1 -53.3 -54.9 70 -99 SPO 1997 10 08 12 33 56 6.7 -9 683.50 -55.2 -53.4 -55.0 70 -99 SPO 1997 10 08 12 34 57 6.5 -9 683.50 -55.2 -53.5 -55.0 70 -99 SPO 1997 10 08 12 35 58 6.5 -9 683.50 -55.3 -53.6 -55.1 70 -99 SPO 1997 10 08 12 36 58 6.3 -9 683.50 -55.4 -53.7 -55.2 71 -99 SPO 1997 10 08 12 37 59 6.1 -9 683.50 -55.4 -53.7 -55.2 71 -99 SPO 1997 10 08 12 38 59 6.2 -9 683.50 -55.5 -53.7 -55.2 71 -99 SPO 1997 10 08 12 39 58 6.2 -9 683.60 -55.5 -53.8 -55.2 71 -99 SPO 1997 10 08 12 40 59 6.4 -9 683.60 -55.5 -53.8 -55.2 70 -99 SPO 1997 10 08 12 41 57 6.4 -9 683.60 -55.5 -53.8 -55.2 70 -99 SPO 1997 10 08 12 42 58 6.6 -9 683.50 -55.5 -53.7 -55.2 70 -99 SPO 1997 10 08 12 43 57 6.8 -9 683.50 -55.4 -53.6 -55.2 69 -99 SPO 1997 10 08 12 44 57 6.9 -9 683.50 -55.4 -53.6 -55.1 69 -99 SPO 1997 10 08 12 45 57 6.8 -9 683.50 -55.3 -53.5 -55.2 68 -99 SPO 1997 10 08 12 46 58 6.9 -9 683.50 -55.4 -53.5 -55.2 69 -99 SPO 1997 10 08 12 47 59 6.8 -9 683.50 -55.5 -53.6 -55.2 70 -99 SPO 1997 10 08 12 48 58 6.8 -9 683.50 -55.4 -53.6 -55.2 70 -99 SPO 1997 10 08 12 49 59 6.7 -9 683.50 -55.5 -53.6 -55.3 70 -99 SPO 1997 10 08 12 50 59 6.7 -9 683.50 -55.5 -53.6 -55.3 70 -99 SPO 1997 10 08 12 51 60 6.8 -9 683.50 -55.5 -53.7 -55.3 70 -99 SPO 1997 10 08 12 52 60 6.5 -9 683.50 -55.6 -53.7 -55.4 70 -99 SPO 1997 10 08 12 53 61 6.6 -9 683.50 -55.6 -53.8 -55.4 70 -99 SPO 1997 10 08 12 54 61 6.7 -9 683.50 -55.6 -53.8 -55.4 69 -99 SPO 1997 10 08 12 55 62 6.6 -9 683.50 -55.6 -53.8 -55.4 69 -99 SPO 1997 10 08 12 56 60 6.7 -9 683.50 -55.7 -53.8 -55.5 69 -99 SPO 1997 10 08 12 57 61 7.0 -9 683.50 -55.6 -53.8 -55.4 68 -99 SPO 1997 10 08 12 58 61 6.9 -9 683.50 -55.6 -53.8 -55.4 68 -99 SPO 1997 10 08 12 59 60 6.7 -9 683.50 -55.6 -53.8 -55.4 68 -99 SPO 1997 10 08 13 00 61 6.9 -9 683.50 -55.6 -53.7 -55.4 68 0 SPO 1997 10 08 13 01 60 6.9 -9 683.50 -55.6 -53.7 -55.4 68 -99 SPO 1997 10 08 13 02 60 6.9 -9 683.50 -55.7 -53.7 -55.5 69 -99 SPO 1997 10 08 13 03 59 7.0 -9 683.50 -55.7 -53.6 -55.5 69 -99 SPO 1997 10 08 13 04 58 7.1 -9 683.50 -55.6 -53.6 -55.4 68 -99 SPO 1997 10 08 13 05 57 7.2 -9 683.50 -55.6 -53.6 -55.4 67 -99 SPO 1997 10 08 13 06 56 6.9 -9 683.50 -55.6 -53.6 -55.4 67 -99 SPO 1997 10 08 13 07 56 6.9 -9 683.50 -55.6 -53.6 -55.4 66 -99 SPO 1997 10 08 13 08 56 7.0 -9 683.50 -55.5 -53.6 -55.4 65 -99 SPO 1997 10 08 13 09 56 7.0 -9 683.50 -55.5 -53.7 -55.3 65 -99 SPO 1997 10 08 13 10 56 6.9 -9 683.50 -55.5 -53.7 -55.3 65 -99 SPO 1997 10 08 13 11 56 6.8 -9 683.50 -55.6 -53.7 -55.4 67 -99 SPO 1997 10 08 13 12 56 7.1 -9 683.50 -55.6 -53.7 -55.4 67 -99 SPO 1997 10 08 13 13 57 7.0 -9 683.50 -55.5 -53.7 -55.4 66 -99 SPO 1997 10 08 13 14 56 7.1 -9 683.50 -55.6 -53.7 -55.4 67 -99 SPO 1997 10 08 13 15 57 7.0 -9 683.50 -55.6 -53.7 -55.4 67 -99 SPO 1997 10 08 13 16 57 7.2 -9 683.50 -55.7 -53.7 -55.5 67 -99 SPO 1997 10 08 13 17 57 7.3 -9 683.40 -55.7 -53.7 -55.5 66 -99 SPO 1997 10 08 13 18 58 7.6 -9 683.40 -55.6 -53.6 -55.5 65 -99 SPO 1997 10 08 13 19 57 7.4 -9 683.40 -55.6 -53.6 -55.4 65 -99 SPO 1997 10 08 13 20 57 7.4 -9 683.40 -55.7 -53.6 -55.5 65 -99 SPO 1997 10 08 13 21 57 7.3 -9 683.40 -55.7 -53.6 -55.4 65 -99 SPO 1997 10 08 13 22 57 7.3 -9 683.40 -55.6 -53.6 -55.4 65 -99 SPO 1997 10 08 13 23 58 7.3 -9 683.40 -55.7 -53.6 -55.5 65 -99 SPO 1997 10 08 13 24 58 7.4 -9 683.40 -55.7 -53.6 -55.5 65 -99 SPO 1997 10 08 13 25 58 7.3 -9 683.40 -55.7 -53.6 -55.5 65 -99 SPO 1997 10 08 13 26 57 7.3 -9 683.40 -55.7 -53.6 -55.5 65 -99 SPO 1997 10 08 13 27 57 7.3 -9 683.40 -55.6 -53.6 -55.4 64 -99 SPO 1997 10 08 13 28 57 7.2 -9 683.40 -55.6 -53.6 -55.4 64 -99 SPO 1997 10 08 13 29 57 7.3 -9 683.40 -55.7 -53.6 -55.4 65 -99 SPO 1997 10 08 13 30 56 7.2 -9 683.40 -55.6 -53.7 -55.4 64 -99 SPO 1997 10 08 13 31 56 7.1 -9 683.40 -55.7 -53.7 -55.4 65 -99 SPO 1997 10 08 13 32 56 7.0 -9 683.40 -55.7 -53.7 -55.4 65 -99 SPO 1997 10 08 13 33 57 7.2 -9 683.40 -55.7 -53.7 -55.4 65 -99 SPO 1997 10 08 13 34 57 7.1 -9 683.30 -55.6 -53.7 -55.4 65 -99 SPO 1997 10 08 13 35 58 7.1 -9 683.30 -55.7 -53.7 -55.4 65 -99 SPO 1997 10 08 13 36 57 6.8 -9 683.30 -55.7 -53.6 -55.4 66 -99 SPO 1997 10 08 13 37 57 6.8 -9 683.30 -55.7 -53.7 -55.4 66 -99 SPO 1997 10 08 13 38 58 6.9 -9 683.20 -55.7 -53.7 -55.4 67 -99 SPO 1997 10 08 13 39 57 6.9 -9 683.20 -55.7 -53.7 -55.4 67 -99 SPO 1997 10 08 13 40 57 6.7 -9 683.20 -55.7 -53.8 -55.4 67 -99 SPO 1997 10 08 13 41 57 6.7 -9 683.20 -55.7 -53.8 -55.4 66 -99 SPO 1997 10 08 13 42 56 6.8 -9 683.20 -55.7 -53.8 -55.4 66 -99 SPO 1997 10 08 13 43 57 6.7 -9 683.20 -55.7 -53.8 -55.4 66 -99 SPO 1997 10 08 13 44 56 6.8 -9 683.20 -55.7 -53.9 -55.4 66 -99 SPO 1997 10 08 13 45 56 6.8 -9 683.20 -55.8 -53.8 -55.4 67 -99 SPO 1997 10 08 13 46 56 7.0 -9 683.20 -55.8 -53.8 -55.4 68 -99 SPO 1997 10 08 13 47 55 7.3 -9 683.20 -55.8 -53.8 -55.4 68 -99 SPO 1997 10 08 13 48 54 7.5 -9 683.20 -55.8 -53.7 -55.4 69 -99 SPO 1997 10 08 13 49 54 7.9 -9 683.10 -55.8 -53.6 -55.4 69 -99 SPO 1997 10 08 13 50 54 8.0 -9 683.10 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 13 51 53 8.0 -9 683.10 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 13 52 53 8.1 -9 683.10 -55.7 -53.4 -55.4 68 -99 SPO 1997 10 08 13 53 54 8.1 -9 683.10 -55.7 -53.4 -55.3 67 -99 SPO 1997 10 08 13 54 54 8.1 -9 683.10 -55.7 -53.4 -55.3 67 -99 SPO 1997 10 08 13 55 54 8.1 -9 683.10 -55.7 -53.4 -55.3 66 -99 SPO 1997 10 08 13 56 54 8.2 -9 683.10 -55.7 -53.3 -55.3 66 -99 SPO 1997 10 08 13 57 54 8.1 -9 683.10 -55.7 -53.3 -55.3 67 -99 SPO 1997 10 08 13 58 54 8.2 -9 683.10 -55.7 -53.3 -55.4 67 -99 SPO 1997 10 08 13 59 54 8.2 -9 683.10 -55.7 -53.3 -55.3 67 -99 SPO 1997 10 08 14 00 54 8.3 -9 683.10 -55.7 -53.3 -55.3 68 0 SPO 1997 10 08 14 01 53 8.1 -9 683.10 -55.7 -53.4 -55.3 68 -99 SPO 1997 10 08 14 02 54 8.2 -9 683.10 -55.7 -53.4 -55.3 69 -99 SPO 1997 10 08 14 03 53 8.1 -9 683.10 -55.7 -53.4 -55.3 69 -99 SPO 1997 10 08 14 04 52 8.0 -9 683.10 -55.7 -53.4 -55.3 68 -99 SPO 1997 10 08 14 05 52 8.0 -9 683.10 -55.7 -53.5 -55.3 68 -99 SPO 1997 10 08 14 06 53 8.3 -9 683.10 -55.7 -53.4 -55.3 67 -99 SPO 1997 10 08 14 07 52 8.2 -9 683.10 -55.7 -53.5 -55.3 67 -99 SPO 1997 10 08 14 08 53 8.4 -9 683.10 -55.7 -53.5 -55.4 67 -99 SPO 1997 10 08 14 09 53 8.4 -9 683.10 -55.7 -53.5 -55.3 68 -99 SPO 1997 10 08 14 10 53 8.7 -9 683.10 -55.7 -53.4 -55.3 68 -99 SPO 1997 10 08 14 11 52 8.3 -9 683.10 -55.7 -53.4 -55.3 68 -99 SPO 1997 10 08 14 12 52 8.2 -9 683.10 -55.7 -53.5 -55.3 68 -99 SPO 1997 10 08 14 13 51 8.5 -9 683.10 -55.7 -53.5 -55.4 67 -99 SPO 1997 10 08 14 14 51 8.4 -9 683.10 -55.7 -53.4 -55.4 67 -99 SPO 1997 10 08 14 15 51 8.4 -9 683.10 -55.7 -53.2 -55.3 66 -99 SPO 1997 10 08 14 16 50 7.9 -9 683.10 -55.7 -53.4 -55.3 66 -99 SPO 1997 10 08 14 17 52 8.1 -9 683.10 -55.7 -53.5 -55.4 66 -99 SPO 1997 10 08 14 18 51 8.0 -9 683.10 -55.7 -53.5 -55.3 67 -99 SPO 1997 10 08 14 19 51 8.1 -9 683.00 -55.7 -53.6 -55.3 68 -99 SPO 1997 10 08 14 20 51 8.2 -9 683.00 -55.8 -53.5 -55.4 68 -99 SPO 1997 10 08 14 21 52 8.3 -9 683.00 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 14 22 52 8.4 -9 683.00 -55.8 -53.4 -55.4 69 -99 SPO 1997 10 08 14 23 53 8.4 -9 683.00 -55.8 -53.3 -55.4 69 -99 SPO 1997 10 08 14 24 52 8.5 -9 683.00 -55.8 -53.3 -55.4 69 -99 SPO 1997 10 08 14 25 52 8.4 -9 683.00 -55.7 -53.3 -55.4 68 -99 SPO 1997 10 08 14 26 52 8.3 -9 683.00 -55.7 -53.2 -55.4 68 -99 SPO 1997 10 08 14 27 53 8.2 -9 683.00 -55.8 -53.3 -55.4 68 -99 SPO 1997 10 08 14 28 53 8.3 -9 683.00 -55.8 -53.2 -55.4 68 -99 SPO 1997 10 08 14 29 53 8.4 -9 683.00 -55.7 -53.0 -55.4 66 -99 SPO 1997 10 08 14 30 53 8.4 -9 683.00 -55.7 -52.9 -55.4 66 -99 SPO 1997 10 08 14 31 54 8.5 -9 683.00 -55.8 -53.0 -55.4 67 -99 SPO 1997 10 08 14 32 54 8.4 -9 682.90 -55.8 -53.0 -55.4 67 -99 SPO 1997 10 08 14 33 54 8.5 -9 682.90 -55.8 -53.0 -55.5 67 -99 SPO 1997 10 08 14 34 54 8.6 -9 682.90 -55.9 -52.9 -55.5 69 -99 SPO 1997 10 08 14 35 53 8.3 -9 682.90 -55.8 -52.9 -55.5 68 -99 SPO 1997 10 08 14 36 53 8.3 -9 682.90 -55.9 -52.9 -55.5 69 -99 SPO 1997 10 08 14 37 54 8.0 -9 682.90 -56.0 -53.0 -55.5 69 -99 SPO 1997 10 08 14 38 55 7.8 -9 682.90 -56.0 -53.0 -55.6 69 -99 SPO 1997 10 08 14 39 55 7.8 -9 683.00 -56.0 -53.1 -55.6 68 -99 SPO 1997 10 08 14 40 56 7.6 -9 683.00 -56.0 -53.1 -55.6 67 -99 SPO 1997 10 08 14 41 56 7.3 -9 683.00 -56.1 -53.2 -55.7 68 -99 SPO 1997 10 08 14 42 57 7.3 -9 683.00 -56.1 -53.4 -55.7 68 -99 SPO 1997 10 08 14 43 57 7.1 -9 683.00 -56.1 -53.6 -55.7 68 -99 SPO 1997 10 08 14 44 58 7.0 -9 683.00 -56.2 -53.7 -55.8 69 -99 SPO 1997 10 08 14 45 58 7.0 -9 683.00 -56.2 -53.6 -55.8 68 -99 SPO 1997 10 08 14 46 59 6.9 -9 683.00 -56.3 -53.7 -55.9 68 -99 SPO 1997 10 08 14 47 58 7.0 -9 683.00 -56.4 -53.8 -55.9 69 -99 SPO 1997 10 08 14 48 57 7.0 -9 683.00 -56.4 -53.7 -55.9 68 -99 SPO 1997 10 08 14 49 56 7.0 -9 683.00 -56.4 -53.7 -55.9 67 -99 SPO 1997 10 08 14 50 56 7.0 -9 683.00 -56.4 -53.7 -55.9 66 -99 SPO 1997 10 08 14 51 55 7.2 -9 683.00 -56.4 -53.7 -56.0 65 -99 SPO 1997 10 08 14 52 55 7.1 -9 683.00 -56.4 -53.8 -55.9 65 -99 SPO 1997 10 08 14 53 55 7.1 -9 683.00 -56.4 -53.7 -56.0 65 -99 SPO 1997 10 08 14 54 54 7.1 -9 683.00 -56.3 -53.6 -55.9 64 -99 SPO 1997 10 08 14 55 54 7.1 -9 683.00 -56.3 -53.6 -55.9 65 -99 SPO 1997 10 08 14 56 54 7.3 -9 683.00 -56.2 -53.6 -55.8 64 -99 SPO 1997 10 08 14 57 54 7.5 -9 683.00 -56.2 -53.5 -55.8 65 -99 SPO 1997 10 08 14 58 54 7.8 -9 683.00 -56.2 -53.3 -55.8 65 -99 SPO 1997 10 08 14 59 54 8.0 -9 682.90 -56.1 -53.1 -55.7 65 -99 SPO 1997 10 08 15 00 54 8.1 -9 682.90 -56.1 -53.1 -55.7 65 0 SPO 1997 10 08 15 01 53 8.2 -9 682.90 -56.1 -53.0 -55.7 65 -99 SPO 1997 10 08 15 02 53 8.4 -9 682.90 -56.0 -53.0 -55.6 64 -99 SPO 1997 10 08 15 03 52 8.3 -9 682.90 -56.0 -52.8 -55.6 64 -99 SPO 1997 10 08 15 04 53 8.4 -9 682.90 -56.0 -52.8 -55.6 64 -99 SPO 1997 10 08 15 05 54 8.4 -9 682.90 -56.0 -52.6 -55.7 64 -99 SPO 1997 10 08 15 06 55 8.4 -9 682.80 -56.0 -52.7 -55.7 65 -99 SPO 1997 10 08 15 07 55 8.5 -9 682.90 -56.1 -52.8 -55.7 66 -99 SPO 1997 10 08 15 08 56 8.6 -9 682.80 -56.1 -52.8 -55.8 65 -99 SPO 1997 10 08 15 09 56 8.6 -9 682.80 -56.1 -52.8 -55.8 66 -99 SPO 1997 10 08 15 10 56 8.4 -9 682.80 -56.0 -52.8 -55.7 65 -99 SPO 1997 10 08 15 11 55 8.1 -9 682.90 -56.0 -53.0 -55.7 66 -99 SPO 1997 10 08 15 12 55 8.1 -9 682.80 -56.1 -53.1 -55.7 67 -99 SPO 1997 10 08 15 13 55 8.0 -9 682.90 -56.1 -53.1 -55.8 66 -99 SPO 1997 10 08 15 14 55 8.0 -9 682.90 -56.1 -53.1 -55.7 66 -99 SPO 1997 10 08 15 15 56 8.1 -9 682.90 -56.1 -53.1 -55.8 65 -99 SPO 1997 10 08 15 16 56 8.1 -9 682.90 -56.1 -53.2 -55.8 64 -99 SPO 1997 10 08 15 17 56 8.2 -9 682.90 -56.2 -53.2 -55.8 65 -99 SPO 1997 10 08 15 18 55 8.3 -9 682.90 -56.2 -53.2 -55.8 65 -99 SPO 1997 10 08 15 19 56 8.4 -9 682.80 -56.2 -53.2 -55.8 65 -99 SPO 1997 10 08 15 20 56 8.4 -9 682.80 -56.2 -53.0 -55.9 65 -99 SPO 1997 10 08 15 21 56 8.3 -9 682.80 -56.2 -53.1 -55.8 65 -99 SPO 1997 10 08 15 22 55 8.2 -9 682.80 -56.2 -53.1 -55.8 66 -99 SPO 1997 10 08 15 23 56 8.1 -9 682.80 -56.3 -53.2 -55.9 66 -99 SPO 1997 10 08 15 24 56 8.1 -9 682.90 -56.3 -53.2 -56.0 66 -99 SPO 1997 10 08 15 25 56 8.1 -9 682.80 -56.4 -53.2 -56.0 67 -99 SPO 1997 10 08 15 26 56 8.1 -9 682.80 -56.4 -53.1 -56.0 67 -99 SPO 1997 10 08 15 27 57 8.0 -9 682.90 -56.4 -53.1 -56.0 66 -99 SPO 1997 10 08 15 28 57 7.8 -9 682.90 -56.4 -53.2 -56.1 66 -99 SPO 1997 10 08 15 29 57 7.6 -9 682.90 -56.5 -53.2 -56.1 67 -99 SPO 1997 10 08 15 30 57 7.5 -9 682.90 -56.5 -53.2 -56.1 66 -99 SPO 1997 10 08 15 31 58 7.4 -9 682.90 -56.5 -53.3 -56.1 66 -99 SPO 1997 10 08 15 32 58 7.0 -9 682.90 -56.6 -53.4 -56.1 67 -99 SPO 1997 10 08 15 33 56 6.9 -9 682.90 -56.6 -53.5 -56.2 67 -99 SPO 1997 10 08 15 34 56 6.5 -9 682.90 -56.6 -53.6 -56.2 66 -99 SPO 1997 10 08 15 35 56 6.3 -9 683.00 -56.7 -53.6 -56.2 66 -99 SPO 1997 10 08 15 36 55 6.5 -9 683.00 -56.6 -53.5 -56.1 64 -99 SPO 1997 10 08 15 37 56 6.2 -9 683.00 -56.6 -53.7 -56.1 64 -99 SPO 1997 10 08 15 38 55 6.2 -9 683.00 -56.6 -53.9 -56.1 64 -99 SPO 1997 10 08 15 39 56 6.1 -9 682.90 -56.6 -54.0 -56.1 64 -99 SPO 1997 10 08 15 40 56 5.9 -9 682.90 -56.6 -54.2 -56.2 64 -99 SPO 1997 10 08 15 41 57 6.1 -9 682.90 -56.6 -54.2 -56.2 64 -99 SPO 1997 10 08 15 42 57 6.1 -9 682.90 -56.6 -54.1 -56.2 64 -99 SPO 1997 10 08 15 43 58 6.1 -9 682.90 -56.7 -54.0 -56.2 65 -99 SPO 1997 10 08 15 44 57 6.2 -9 682.90 -56.6 -53.8 -56.1 64 -99 SPO 1997 10 08 15 45 57 6.4 -9 682.80 -56.6 -53.8 -56.1 64 -99 SPO 1997 10 08 15 46 56 6.4 -9 682.90 -56.6 -53.8 -56.1 64 -99 SPO 1997 10 08 15 47 56 6.5 -9 682.90 -56.6 -53.7 -56.1 64 -99 SPO 1997 10 08 15 48 56 6.5 -9 682.80 -56.6 -53.7 -56.1 64 -99 SPO 1997 10 08 15 49 56 6.5 -9 682.80 -56.7 -53.6 -56.2 65 -99 SPO 1997 10 08 15 50 56 6.5 -9 682.80 -56.7 -53.6 -56.2 64 -99 SPO 1997 10 08 15 51 56 6.2 -9 682.90 -56.7 -53.8 -56.2 64 -99 SPO 1997 10 08 15 52 56 6.1 -9 682.90 -56.7 -53.8 -56.2 64 -99 SPO 1997 10 08 15 53 55 6.0 -9 682.90 -56.8 -53.9 -56.3 65 -99 SPO 1997 10 08 15 54 54 6.2 -9 682.90 -56.8 -54.0 -56.3 65 -99 SPO 1997 10 08 15 55 54 6.2 -9 682.90 -56.8 -54.1 -56.3 65 -99 SPO 1997 10 08 15 56 53 6.0 -9 682.90 -56.8 -54.0 -56.3 65 -99 SPO 1997 10 08 15 57 53 6.0 -9 682.90 -56.9 -54.1 -56.3 66 -99 SPO 1997 10 08 15 58 54 6.2 -9 682.90 -56.9 -54.1 -56.3 66 -99 SPO 1997 10 08 15 59 54 6.3 -9 682.80 -56.9 -54.1 -56.4 65 -99 SPO 1997 10 08 16 00 54 6.7 -9 682.80 -56.8 -54.0 -56.4 64 0 SPO 1997 10 08 16 01 54 7.0 -9 682.80 -56.9 -53.7 -56.4 64 -99 SPO 1997 10 08 16 02 54 7.3 -9 682.80 -56.9 -53.2 -56.4 64 -99 SPO 1997 10 08 16 03 54 7.6 -9 682.80 -56.9 -52.9 -56.5 64 -99 SPO 1997 10 08 16 04 54 7.8 -9 682.80 -56.9 -52.8 -56.4 64 -99 SPO 1997 10 08 16 05 55 7.9 -9 682.80 -56.8 -52.6 -56.4 64 -99 SPO 1997 10 08 16 06 57 8.0 -9 682.70 -56.8 -52.7 -56.4 64 -99 SPO 1997 10 08 16 07 59 7.9 -9 682.70 -56.7 -52.8 -56.3 64 -99 SPO 1997 10 08 16 08 58 7.7 -9 682.70 -56.7 -53.0 -56.3 64 -99 SPO 1997 10 08 16 09 59 7.7 -9 682.80 -56.8 -53.0 -56.4 65 -99 SPO 1997 10 08 16 10 60 7.3 -9 682.80 -56.8 -53.2 -56.5 65 -99 SPO 1997 10 08 16 11 59 7.1 -9 682.70 -56.9 -53.2 -56.5 66 -99 SPO 1997 10 08 16 12 59 7.2 -9 682.80 -57.0 -53.2 -56.5 66 -99 SPO 1997 10 08 16 13 59 6.8 -9 682.80 -57.0 -53.2 -56.5 66 -99 SPO 1997 10 08 16 14 58 6.8 -9 682.80 -57.0 -53.2 -56.6 65 -99 SPO 1997 10 08 16 15 57 6.5 -9 682.80 -57.0 -53.4 -56.6 66 -99 SPO 1997 10 08 16 16 57 6.7 -9 682.80 -57.0 -53.4 -56.5 66 -99 SPO 1997 10 08 16 17 57 6.8 -9 682.80 -57.0 -53.3 -56.5 66 -99 SPO 1997 10 08 16 18 57 7.0 -9 682.80 -56.9 -53.2 -56.4 65 -99 SPO 1997 10 08 16 19 57 6.9 -9 682.80 -56.8 -53.3 -56.4 64 -99 SPO 1997 10 08 16 20 57 6.8 -9 682.70 -56.8 -53.4 -56.4 64 -99 SPO 1997 10 08 16 21 57 6.8 -9 682.70 -56.8 -53.5 -56.4 64 -99 SPO 1997 10 08 16 22 57 6.8 -9 682.80 -56.8 -53.4 -56.3 64 -99 SPO 1997 10 08 16 23 58 7.0 -9 682.70 -56.8 -53.4 -56.3 64 -99 SPO 1997 10 08 16 24 57 7.1 -9 682.70 -56.8 -53.3 -56.3 63 -99 SPO 1997 10 08 16 25 57 7.2 -9 682.70 -56.8 -53.4 -56.3 64 -99 SPO 1997 10 08 16 26 56 7.4 -9 682.60 -56.7 -53.3 -56.3 63 -99 SPO 1997 10 08 16 27 56 7.3 -9 682.60 -56.7 -53.3 -56.3 64 -99 SPO 1997 10 08 16 28 54 7.1 -9 682.60 -56.8 -53.4 -56.3 64 -99 SPO 1997 10 08 16 29 54 6.8 -9 682.60 -56.8 -53.4 -56.3 64 -99 SPO 1997 10 08 16 30 53 7.2 -9 682.70 -56.8 -53.3 -56.3 64 -99 SPO 1997 10 08 16 31 52 7.1 -9 682.70 -56.7 -53.2 -56.3 64 -99 SPO 1997 10 08 16 32 52 7.5 -9 682.60 -56.7 -53.0 -56.3 64 -99 SPO 1997 10 08 16 33 52 7.5 -9 682.60 -56.6 -52.8 -56.2 64 -99 SPO 1997 10 08 16 34 52 7.7 -9 682.60 -56.6 -52.8 -56.2 64 -99 SPO 1997 10 08 16 35 52 7.8 -9 682.60 -56.4 -52.6 -56.0 62 -99 SPO 1997 10 08 16 36 52 8.1 -9 682.60 -56.4 -52.6 -56.0 62 -99 SPO 1997 10 08 16 37 52 8.0 -9 682.60 -56.3 -52.6 -56.0 61 -99 SPO 1997 10 08 16 38 52 8.2 -9 682.60 -56.2 -52.7 -55.9 62 -99 SPO 1997 10 08 16 39 53 8.3 -9 682.60 -56.2 -52.7 -55.9 62 -99 SPO 1997 10 08 16 40 52 8.3 -9 682.60 -56.2 -52.8 -55.8 63 -99 SPO 1997 10 08 16 41 52 8.2 -9 682.60 -56.1 -52.8 -55.8 63 -99 SPO 1997 10 08 16 42 51 8.0 -9 682.60 -56.1 -52.8 -55.7 64 -99 SPO 1997 10 08 16 43 51 8.1 -9 682.60 -56.1 -52.8 -55.7 64 -99 SPO 1997 10 08 16 44 51 8.2 -9 682.60 -56.0 -52.6 -55.6 65 -99 SPO 1997 10 08 16 45 51 8.3 -9 682.60 -56.0 -52.5 -55.6 65 -99 SPO 1997 10 08 16 46 50 8.3 -9 682.60 -55.8 -52.4 -55.5 63 -99 SPO 1997 10 08 16 47 50 8.2 -9 682.60 -55.8 -52.4 -55.4 64 -99 SPO 1997 10 08 16 48 50 8.2 -9 682.60 -55.7 -52.4 -55.4 63 -99 SPO 1997 10 08 16 49 51 8.5 -9 682.60 -55.6 -52.3 -55.3 62 -99 SPO 1997 10 08 16 50 51 8.5 -9 682.60 -55.6 -52.3 -55.3 64 -99 SPO 1997 10 08 16 51 52 8.5 -9 682.60 -55.6 -52.3 -55.3 65 -99 SPO 1997 10 08 16 52 52 8.6 -9 682.60 -55.6 -52.3 -55.3 66 -99 SPO 1997 10 08 16 53 53 8.4 -9 682.60 -55.6 -52.3 -55.3 67 -99 SPO 1997 10 08 16 54 54 8.5 -9 682.60 -55.6 -52.3 -55.3 67 -99 SPO 1997 10 08 16 55 53 8.4 -9 682.50 -55.6 -52.3 -55.2 67 -99 SPO 1997 10 08 16 56 53 8.3 -9 682.50 -55.6 -52.4 -55.3 67 -99 SPO 1997 10 08 16 57 53 8.3 -9 682.50 -55.6 -52.4 -55.2 67 -99 SPO 1997 10 08 16 58 53 8.3 -9 682.50 -55.5 -52.4 -55.2 66 -99 SPO 1997 10 08 16 59 54 8.1 -9 682.50 -55.6 -52.5 -55.2 66 -99 SPO 1997 10 08 17 00 53 7.7 -9 682.50 -55.5 -52.6 -55.1 65 0 SPO 1997 10 08 17 01 53 7.6 -9 682.50 -55.6 -52.8 -55.2 67 -99 SPO 1997 10 08 17 02 52 7.8 -9 682.50 -55.6 -52.8 -55.2 67 -99 SPO 1997 10 08 17 03 53 7.8 -9 682.50 -55.6 -52.7 -55.2 67 -99 SPO 1997 10 08 17 04 53 8.0 -9 682.50 -55.5 -52.6 -55.2 67 -99 SPO 1997 10 08 17 05 53 7.8 -9 682.50 -55.5 -52.6 -55.2 67 -99 SPO 1997 10 08 17 06 53 7.6 -9 682.50 -55.6 -52.6 -55.2 68 -99 SPO 1997 10 08 17 07 52 7.5 -9 682.50 -55.6 -52.6 -55.2 68 -99 SPO 1997 10 08 17 08 52 7.2 -9 682.50 -55.6 -52.7 -55.2 68 -99 SPO 1997 10 08 17 09 51 7.2 -9 682.50 -55.6 -52.7 -55.2 67 -99 SPO 1997 10 08 17 10 51 7.1 -9 682.50 -55.6 -52.8 -55.2 66 -99 SPO 1997 10 08 17 11 52 7.0 -9 682.60 -55.6 -52.8 -55.2 65 -99 SPO 1997 10 08 17 12 53 7.0 -9 682.50 -55.7 -52.9 -55.3 66 -99 SPO 1997 10 08 17 13 53 6.7 -9 682.50 -55.7 -53.1 -55.2 66 -99 SPO 1997 10 08 17 14 53 6.6 -9 682.50 -55.7 -53.3 -55.3 66 -99 SPO 1997 10 08 17 15 52 6.8 -9 682.50 -55.8 -53.4 -55.3 67 -99 SPO 1997 10 08 17 16 52 6.8 -9 682.50 -55.8 -53.4 -55.4 67 -99 SPO 1997 10 08 17 17 52 6.8 -9 682.50 -55.9 -53.5 -55.4 68 -99 SPO 1997 10 08 17 18 52 6.8 -9 682.50 -55.9 -53.5 -55.4 68 -99 SPO 1997 10 08 17 19 52 6.6 -9 682.50 -55.8 -53.6 -55.4 67 -99 SPO 1997 10 08 17 20 53 6.7 -9 682.50 -55.8 -53.7 -55.4 66 -99 SPO 1997 10 08 17 21 53 6.6 -9 682.50 -55.7 -53.6 -55.3 65 -99 SPO 1997 10 08 17 22 55 6.4 -9 682.50 -55.8 -53.6 -55.3 65 -99 SPO 1997 10 08 17 23 56 6.6 -9 682.50 -55.8 -53.7 -55.4 65 -99 SPO 1997 10 08 17 24 56 6.5 -9 682.50 -55.9 -53.8 -55.4 67 -99 SPO 1997 10 08 17 25 57 6.6 -9 682.50 -55.8 -53.8 -55.4 66 -99 SPO 1997 10 08 17 26 58 6.5 -9 682.50 -55.8 -53.8 -55.4 65 -99 SPO 1997 10 08 17 27 57 6.6 -9 682.50 -55.8 -53.8 -55.4 65 -99 SPO 1997 10 08 17 28 58 6.7 -9 682.50 -55.8 -53.7 -55.4 66 -99 SPO 1997 10 08 17 29 57 6.5 -9 682.50 -55.9 -53.8 -55.4 67 -99 SPO 1997 10 08 17 30 56 6.6 -9 682.50 -55.8 -53.8 -55.4 66 -99 SPO 1997 10 08 17 31 57 6.8 -9 682.50 -55.8 -53.8 -55.3 65 -99 SPO 1997 10 08 17 32 56 6.7 -9 682.50 -55.8 -53.8 -55.4 65 -99 SPO 1997 10 08 17 33 55 7.1 -9 682.50 -55.8 -53.6 -55.3 65 -99 SPO 1997 10 08 17 34 55 7.2 -9 682.40 -55.7 -53.5 -55.3 65 -99 SPO 1997 10 08 17 35 54 7.5 -9 682.40 -55.7 -53.4 -55.2 65 -99 SPO 1997 10 08 17 36 54 7.8 -9 682.40 -55.6 -53.3 -55.2 65 -99 SPO 1997 10 08 17 37 53 8.0 -9 682.30 -55.4 -53.1 -55.1 65 -99 SPO 1997 10 08 17 38 53 8.1 -9 682.30 -55.4 -53.1 -55.1 66 -99 SPO 1997 10 08 17 39 51 8.1 -9 682.30 -55.4 -53.0 -55.1 67 -99 SPO 1997 10 08 17 40 51 8.2 -9 682.30 -55.2 -52.9 -54.9 66 -99 SPO 1997 10 08 17 41 51 8.1 -9 682.30 -55.1 -52.8 -54.8 66 -99 SPO 1997 10 08 17 42 49 8.2 -9 682.30 -55.0 -52.9 -54.7 66 -99 SPO 1997 10 08 17 43 48 8.2 -9 682.40 -55.0 -52.8 -54.7 66 -99 SPO 1997 10 08 17 44 48 8.0 -9 682.30 -54.9 -52.8 -54.6 66 -99 SPO 1997 10 08 17 45 47 8.2 -9 682.30 -54.9 -52.7 -54.5 66 -99 SPO 1997 10 08 17 46 47 8.3 -9 682.30 -54.8 -52.6 -54.5 66 -99 SPO 1997 10 08 17 47 46 8.3 -9 682.30 -54.8 -52.5 -54.4 66 -99 SPO 1997 10 08 17 48 46 8.3 -9 682.30 -54.7 -52.5 -54.3 66 -99 SPO 1997 10 08 17 49 46 8.2 -9 682.30 -54.6 -52.6 -54.3 66 -99 SPO 1997 10 08 17 50 46 8.0 -9 682.30 -54.6 -52.5 -54.2 67 -99 SPO 1997 10 08 17 51 45 8.1 -9 682.30 -54.5 -52.5 -54.2 67 -99 SPO 1997 10 08 17 52 46 8.1 -9 682.30 -54.4 -52.4 -54.2 67 -99 SPO 1997 10 08 17 53 45 8.3 -9 682.30 -54.4 -52.5 -54.1 67 -99 SPO 1997 10 08 17 54 46 8.5 -9 682.30 -54.4 -52.4 -54.1 67 -99 SPO 1997 10 08 17 55 45 8.3 -9 682.30 -54.4 -52.4 -54.1 68 -99 SPO 1997 10 08 17 56 45 8.7 -9 682.30 -54.4 -52.2 -54.1 68 -99 SPO 1997 10 08 17 57 46 8.5 -9 682.30 -54.4 -52.2 -54.1 69 -99 SPO 1997 10 08 17 58 45 8.6 -9 682.30 -54.4 -52.2 -54.2 69 -99 SPO 1997 10 08 17 59 44 8.4 -9 682.30 -54.5 -52.3 -54.2 70 -99 SPO 1997 10 08 18 00 44 8.3 -9 682.30 -54.6 -52.4 -54.2 71 0 SPO 1997 10 08 18 01 45 8.3 -9 682.30 -54.6 -52.4 -54.3 71 -99 SPO 1997 10 08 18 02 45 8.6 -9 682.30 -54.6 -52.4 -54.3 71 -99 SPO 1997 10 08 18 03 45 8.5 -9 682.30 -54.7 -52.3 -54.4 71 -99 SPO 1997 10 08 18 04 46 8.5 -9 682.30 -54.7 -52.2 -54.4 71 -99 SPO 1997 10 08 18 05 46 8.6 -9 682.30 -54.8 -52.1 -54.4 71 -99 SPO 1997 10 08 18 06 46 8.6 -9 682.30 -54.8 -52.0 -54.5 71 -99 SPO 1997 10 08 18 07 45 8.3 -9 682.30 -54.9 -52.1 -54.5 71 -99 SPO 1997 10 08 18 08 45 8.4 -9 682.30 -54.9 -52.0 -54.5 71 -99 SPO 1997 10 08 18 09 44 8.3 -9 682.30 -55.0 -52.0 -54.6 71 -99 SPO 1997 10 08 18 10 44 8.0 -9 682.30 -55.0 -52.0 -54.6 71 -99 SPO 1997 10 08 18 11 45 7.8 -9 682.30 -55.0 -52.1 -54.6 71 -99 SPO 1997 10 08 18 12 45 7.7 -9 682.30 -55.0 -52.1 -54.6 71 -99 SPO 1997 10 08 18 13 45 7.7 -9 682.30 -55.0 -52.1 -54.6 71 -99 SPO 1997 10 08 18 14 45 7.7 -9 682.30 -55.0 -52.1 -54.6 71 -99 SPO 1997 10 08 18 15 45 7.5 -9 682.30 -55.0 -52.3 -54.6 69 -99 SPO 1997 10 08 18 16 46 7.6 -9 682.30 -55.0 -52.4 -54.6 69 -99 SPO 1997 10 08 18 17 46 7.6 -9 682.30 -55.0 -52.4 -54.5 69 -99 SPO 1997 10 08 18 18 46 7.7 -9 682.30 -55.0 -52.4 -54.6 69 -99 SPO 1997 10 08 18 19 45 7.9 -9 682.30 -55.0 -52.3 -54.6 68 -99 SPO 1997 10 08 18 20 45 7.7 -9 682.30 -55.0 -52.3 -54.6 68 -99 SPO 1997 10 08 18 21 46 8.0 -9 682.30 -55.1 -52.3 -54.6 69 -99 SPO 1997 10 08 18 22 46 8.2 -9 682.20 -55.0 -52.3 -54.6 69 -99 SPO 1997 10 08 18 23 47 8.3 -9 682.20 -55.0 -52.2 -54.6 69 -99 SPO 1997 10 08 18 24 47 8.4 -9 682.20 -55.0 -52.2 -54.6 69 -99 SPO 1997 10 08 18 25 48 8.4 -9 682.20 -55.0 -52.1 -54.7 69 -99 SPO 1997 10 08 18 26 48 8.4 -9 682.20 -55.0 -52.0 -54.7 69 -99 SPO 1997 10 08 18 27 48 8.2 -9 682.20 -55.0 -52.0 -54.7 69 -99 SPO 1997 10 08 18 28 48 8.4 -9 682.20 -55.1 -52.0 -54.7 70 -99 SPO 1997 10 08 18 29 48 8.1 -9 682.20 -55.1 -52.1 -54.8 69 -99 SPO 1997 10 08 18 30 48 8.3 -9 682.20 -55.1 -52.2 -54.8 69 -99 SPO 1997 10 08 18 31 49 8.2 -9 682.20 -55.1 -52.2 -54.8 69 -99 SPO 1997 10 08 18 32 49 8.4 -9 682.20 -55.1 -52.2 -54.8 69 -99 SPO 1997 10 08 18 33 49 8.5 -9 682.20 -55.1 -52.2 -54.7 69 -99 SPO 1997 10 08 18 34 49 8.3 -9 682.20 -55.1 -52.2 -54.8 70 -99 SPO 1997 10 08 18 35 49 8.2 -9 682.20 -55.2 -52.2 -54.8 71 -99 SPO 1997 10 08 18 36 49 8.5 -9 682.20 -55.2 -52.2 -54.8 71 -99 SPO 1997 10 08 18 37 49 8.4 -9 682.20 -55.1 -52.1 -54.8 70 -99 SPO 1997 10 08 18 38 49 8.5 -9 682.20 -55.1 -52.0 -54.7 70 -99 SPO 1997 10 08 18 39 49 8.7 -9 682.20 -55.0 -52.0 -54.7 68 -99 SPO 1997 10 08 18 40 49 8.3 -9 682.20 -55.0 -51.9 -54.6 68 -99 SPO 1997 10 08 18 41 49 8.5 -9 682.20 -54.9 -51.9 -54.6 67 -99 SPO 1997 10 08 18 42 49 8.5 -9 682.10 -54.9 -51.9 -54.6 67 -99 SPO 1997 10 08 18 43 48 8.4 -9 682.10 -54.9 -52.0 -54.6 67 -99 SPO 1997 10 08 18 44 50 8.7 -9 682.10 -54.8 -51.9 -54.5 66 -99 SPO 1997 10 08 18 45 50 8.8 -9 682.10 -54.8 -51.8 -54.5 67 -99 SPO 1997 10 08 18 46 50 8.9 -9 682.10 -54.8 -51.8 -54.5 69 -99 SPO 1997 10 08 18 47 49 9.0 -9 682.10 -54.8 -51.6 -54.6 69 -99 SPO 1997 10 08 18 48 49 9.0 -9 682.10 -54.9 -51.4 -54.6 71 -99 SPO 1997 10 08 18 49 49 9.0 -9 682.10 -54.9 -51.4 -54.5 71 -99 SPO 1997 10 08 18 50 49 9.0 -9 682.10 -54.9 -51.4 -54.5 71 -99 SPO 1997 10 08 18 51 49 9.1 -9 682.10 -54.8 -51.4 -54.5 70 -99 SPO 1997 10 08 18 52 48 9.3 -9 682.10 -54.8 -51.4 -54.5 70 -99 SPO 1997 10 08 18 53 48 9.4 -9 682.10 -54.8 -51.2 -54.5 70 -99 SPO 1997 10 08 18 54 48 9.2 -9 682.10 -54.8 -51.2 -54.5 70 -99 SPO 1997 10 08 18 55 48 9.3 -9 682.10 -54.8 -51.1 -54.5 70 -99 SPO 1997 10 08 18 56 47 9.3 -9 682.10 -54.8 -51.1 -54.5 71 -99 SPO 1997 10 08 18 57 48 9.4 -9 682.10 -54.8 -51.0 -54.5 71 -99 SPO 1997 10 08 18 58 48 9.4 -9 682.10 -54.8 -51.0 -54.5 71 -99 SPO 1997 10 08 18 59 48 9.5 -9 682.10 -54.8 -51.0 -54.4 71 -99 SPO 1997 10 08 19 00 48 9.4 -9 682.10 -54.7 -51.0 -54.4 71 0 SPO 1997 10 08 19 01 48 9.4 -9 682.10 -54.8 -50.9 -54.4 71 -99 SPO 1997 10 08 19 02 49 9.4 -9 682.10 -54.8 -50.9 -54.5 71 -99 SPO 1997 10 08 19 03 49 9.4 -9 682.10 -54.8 -51.0 -54.5 71 -99 SPO 1997 10 08 19 04 49 9.5 -9 682.10 -54.8 -51.1 -54.4 70 -99 SPO 1997 10 08 19 05 48 9.4 -9 682.00 -54.8 -51.1 -54.4 70 -99 SPO 1997 10 08 19 06 48 9.7 -9 682.00 -54.8 -51.0 -54.4 71 -99 SPO 1997 10 08 19 07 47 9.7 -9 682.00 -54.7 -51.0 -54.4 70 -99 SPO 1997 10 08 19 08 47 9.6 -9 682.00 -54.8 -50.9 -54.4 71 -99 SPO 1997 10 08 19 09 47 9.6 -9 682.00 -54.8 -50.9 -54.4 72 -99 SPO 1997 10 08 19 10 48 9.3 -9 682.00 -54.7 -50.9 -54.4 71 -99 SPO 1997 10 08 19 11 49 9.2 -9 682.00 -54.7 -51.0 -54.4 72 -99 SPO 1997 10 08 19 12 50 9.1 -9 682.00 -54.8 -51.2 -54.4 73 -99 SPO 1997 10 08 19 13 50 9.1 -9 682.00 -54.8 -51.2 -54.4 73 -99 SPO 1997 10 08 19 14 50 9.2 -9 682.00 -54.8 -51.3 -54.4 72 -99 SPO 1997 10 08 19 15 50 9.0 -9 682.00 -54.8 -51.3 -54.4 71 -99 SPO 1997 10 08 19 16 50 9.3 -9 682.00 -54.7 -51.3 -54.3 71 -99 SPO 1997 10 08 19 17 49 9.6 -9 681.90 -54.5 -51.2 -54.2 69 -99 SPO 1997 10 08 19 18 50 9.6 -9 681.90 -54.5 -51.1 -54.2 70 -99 SPO 1997 10 08 19 19 49 9.8 -9 681.90 -54.4 -51.0 -54.2 69 -99 SPO 1997 10 08 19 20 49 9.8 -9 681.90 -54.4 -50.9 -54.2 70 -99 SPO 1997 10 08 19 21 49 9.8 -9 681.90 -54.4 -51.0 -54.1 71 -99 SPO 1997 10 08 19 22 49 9.5 -9 681.90 -54.4 -51.0 -54.1 72 -99 SPO 1997 10 08 19 23 49 9.8 -9 681.90 -54.4 -51.0 -54.1 72 -99 SPO 1997 10 08 19 24 49 9.6 -9 681.90 -54.4 -51.1 -54.1 72 -99 SPO 1997 10 08 19 25 48 9.4 -9 681.90 -54.4 -51.1 -54.1 72 -99 SPO 1997 10 08 19 26 48 9.3 -9 681.90 -54.4 -51.2 -54.1 72 -99 SPO 1997 10 08 19 27 47 9.4 -9 681.90 -54.4 -51.2 -54.1 71 -99 SPO 1997 10 08 19 28 48 9.2 -9 681.90 -54.3 -51.3 -54.0 70 -99 SPO 1997 10 08 19 29 48 8.8 -9 682.00 -54.4 -51.4 -54.0 71 -99 SPO 1997 10 08 19 30 48 8.6 -9 682.00 -54.4 -51.6 -54.0 72 -99 SPO 1997 10 08 19 31 48 8.8 -9 682.00 -54.4 -51.5 -54.1 72 -99 SPO 1997 10 08 19 32 48 9.2 -9 681.90 -54.4 -51.4 -54.0 72 -99 SPO 1997 10 08 19 33 48 9.3 -9 681.90 -54.3 -51.3 -54.0 71 -99 SPO 1997 10 08 19 34 47 9.3 -9 681.90 -54.3 -51.3 -54.0 71 -99 SPO 1997 10 08 19 35 47 9.4 -9 681.90 -54.2 -51.3 -53.9 70 -99 SPO 1997 10 08 19 36 47 9.3 -9 682.00 -54.2 -51.3 -54.0 70 -99 SPO 1997 10 08 19 37 47 9.1 -9 682.00 -54.2 -51.3 -53.9 69 -99 SPO 1997 10 08 19 38 46 9.1 -9 682.00 -54.3 -51.4 -53.9 70 -99 SPO 1997 10 08 19 39 47 9.2 -9 682.00 -54.2 -51.4 -53.9 69 -99 SPO 1997 10 08 19 40 47 9.3 -9 682.00 -54.2 -51.4 -53.8 69 -99 SPO 1997 10 08 19 41 47 9.3 -9 682.00 -54.2 -51.4 -53.9 69 -99 SPO 1997 10 08 19 42 47 9.0 -9 682.00 -54.2 -51.5 -53.9 70 -99 SPO 1997 10 08 19 43 48 9.1 -9 682.00 -54.2 -51.5 -53.9 70 -99 SPO 1997 10 08 19 44 49 8.9 -9 682.00 -54.2 -51.7 -53.9 71 -99 SPO 1997 10 08 19 45 49 8.8 -9 682.10 -54.3 -51.8 -54.0 72 -99 SPO 1997 10 08 19 46 49 8.6 -9 682.10 -54.3 -51.8 -54.0 72 -99 SPO 1997 10 08 19 47 50 8.5 -9 682.10 -54.4 -51.8 -54.0 72 -99 SPO 1997 10 08 19 48 50 8.4 -9 682.10 -54.4 -51.9 -54.0 72 -99 SPO 1997 10 08 19 49 51 8.3 -9 682.10 -54.4 -52.0 -54.0 72 -99 SPO 1997 10 08 19 50 51 8.1 -9 682.10 -54.4 -52.0 -54.1 71 -99 SPO 1997 10 08 19 51 51 8.0 -9 682.10 -54.4 -52.0 -54.1 71 -99 SPO 1997 10 08 19 52 51 7.9 -9 682.20 -54.4 -52.0 -54.1 70 -99 SPO 1997 10 08 19 53 50 7.9 -9 682.20 -54.4 -52.1 -54.1 70 -99 SPO 1997 10 08 19 54 50 8.0 -9 682.20 -54.4 -52.1 -54.0 70 -99 SPO 1997 10 08 19 55 51 7.9 -9 682.20 -54.4 -52.2 -54.1 71 -99 SPO 1997 10 08 19 56 52 7.8 -9 682.20 -54.4 -52.1 -54.1 71 -99 SPO 1997 10 08 19 57 51 8.1 -9 682.20 -54.4 -52.1 -54.1 72 -99 SPO 1997 10 08 19 58 51 7.9 -9 682.20 -54.4 -52.0 -54.0 72 -99 SPO 1997 10 08 19 59 51 8.0 -9 682.10 -54.4 -52.0 -54.0 71 -99 SPO 1997 10 08 20 00 51 8.1 -9 682.10 -54.4 -52.0 -54.0 71 0 SPO 1997 10 08 20 01 50 8.3 -9 682.10 -54.4 -52.0 -54.0 71 -99 SPO 1997 10 08 20 02 50 8.4 -9 682.10 -54.3 -51.9 -54.0 70 -99 SPO 1997 10 08 20 03 49 8.7 -9 682.10 -54.4 -51.8 -54.0 71 -99 SPO 1997 10 08 20 04 50 8.7 -9 682.10 -54.4 -51.8 -54.0 72 -99 SPO 1997 10 08 20 05 49 8.7 -9 682.10 -54.4 -51.6 -54.0 72 -99 SPO 1997 10 08 20 06 49 8.7 -9 682.10 -54.3 -51.6 -54.0 72 -99 SPO 1997 10 08 20 07 49 8.9 -9 682.00 -54.4 -51.5 -54.1 73 -99 SPO 1997 10 08 20 08 48 8.8 -9 682.00 -54.2 -51.4 -54.0 72 -99 SPO 1997 10 08 20 09 48 8.8 -9 682.00 -54.2 -51.4 -54.0 72 -99 SPO 1997 10 08 20 10 47 8.8 -9 682.00 -54.3 -51.5 -54.0 72 -99 SPO 1997 10 08 20 11 46 8.7 -9 682.00 -54.2 -51.4 -53.8 72 -99 SPO 1997 10 08 20 12 46 8.8 -9 682.00 -54.0 -51.4 -53.7 70 -99 SPO 1997 10 08 20 13 46 8.9 -9 681.90 -53.9 -51.2 -53.6 69 -99 SPO 1997 10 08 20 14 45 9.1 -9 681.90 -53.8 -51.2 -53.6 69 -99 SPO 1997 10 08 20 15 45 9.2 -9 681.90 -53.7 -51.2 -53.5 69 -99 SPO 1997 10 08 20 16 46 9.2 -9 681.90 -53.7 -51.1 -53.5 70 -99 SPO 1997 10 08 20 17 46 9.2 -9 681.90 -53.7 -51.0 -53.5 71 -99 SPO 1997 10 08 20 18 46 9.0 -9 682.00 -53.8 -51.1 -53.6 73 -99 SPO 1997 10 08 20 19 46 9.2 -9 681.90 -53.8 -51.1 -53.6 73 -99 SPO 1997 10 08 20 20 47 9.1 -9 681.90 -53.8 -51.1 -53.7 73 -99 SPO 1997 10 08 20 21 46 8.8 -9 681.90 -53.8 -51.0 -53.6 73 -99 SPO 1997 10 08 20 22 47 8.5 -9 681.90 -53.7 -51.1 -53.5 73 -99 SPO 1997 10 08 20 23 47 8.5 -9 681.90 -53.7 -51.2 -53.4 72 -99 SPO 1997 10 08 20 24 46 8.4 -9 681.90 -53.6 -51.1 -53.4 71 -99 SPO 1997 10 08 20 25 45 8.7 -9 681.90 -53.4 -51.0 -53.3 70 -99 SPO 1997 10 08 20 26 45 8.7 -9 681.90 -53.5 -51.0 -53.3 71 -99 SPO 1997 10 08 20 27 45 8.7 -9 681.90 -53.5 -51.0 -53.3 72 -99 SPO 1997 10 08 20 28 45 8.9 -9 682.00 -53.5 -51.0 -53.3 73 -99 SPO 1997 10 08 20 29 45 9.3 -9 682.00 -53.5 -51.0 -53.3 73 -99 SPO 1997 10 08 20 30 45 9.3 -9 682.00 -53.4 -50.9 -53.2 73 -99 SPO 1997 10 08 20 31 45 9.2 -9 681.90 -53.3 -50.9 -53.2 72 -99 SPO 1997 10 08 20 32 45 9.2 -9 681.90 -53.3 -50.8 -53.1 73 -99 SPO 1997 10 08 20 33 45 9.3 -9 681.90 -53.2 -50.8 -53.1 72 -99 SPO 1997 10 08 20 34 45 9.5 -9 681.90 -53.3 -50.8 -53.2 73 -99 SPO 1997 10 08 20 35 44 9.6 -9 681.90 -53.3 -50.7 -53.2 72 -99 SPO 1997 10 08 20 36 44 9.2 -9 681.90 -53.2 -50.7 -53.1 71 -99 SPO 1997 10 08 20 37 44 9.2 -9 681.90 -53.4 -50.8 -53.2 73 -99 SPO 1997 10 08 20 38 44 9.0 -9 681.90 -53.4 -50.8 -53.2 72 -99 SPO 1997 10 08 20 39 45 8.9 -9 682.00 -53.4 -50.8 -53.3 72 -99 SPO 1997 10 08 20 40 46 8.6 -9 682.00 -53.4 -51.0 -53.3 73 -99 SPO 1997 10 08 20 41 47 8.3 -9 682.00 -53.5 -51.1 -53.4 73 -99 SPO 1997 10 08 20 42 46 8.1 -9 682.00 -53.6 -51.2 -53.4 74 -99 SPO 1997 10 08 20 43 47 8.3 -9 682.00 -53.7 -51.2 -53.5 75 -99 SPO 1997 10 08 20 44 46 8.4 -9 682.00 -53.7 -51.2 -53.5 74 -99 SPO 1997 10 08 20 45 46 8.3 -9 682.00 -53.7 -51.1 -53.5 74 -99 SPO 1997 10 08 20 46 47 8.3 -9 682.00 -53.8 -51.0 -53.5 74 -99 SPO 1997 10 08 20 47 47 8.3 -9 681.90 -53.8 -51.0 -53.6 74 -99 SPO 1997 10 08 20 48 48 8.1 -9 681.90 -53.8 -51.1 -53.6 73 -99 SPO 1997 10 08 20 49 48 8.5 -9 681.90 -53.8 -51.0 -53.6 73 -99 SPO 1997 10 08 20 50 48 8.6 -9 681.90 -53.7 -50.9 -53.6 72 -99 SPO 1997 10 08 20 51 49 8.6 -9 681.90 -53.7 -50.8 -53.6 72 -99 SPO 1997 10 08 20 52 50 9.0 -9 681.90 -53.7 -50.8 -53.6 72 -99 SPO 1997 10 08 20 53 49 9.1 -9 681.90 -53.8 -50.7 -53.6 73 -99 SPO 1997 10 08 20 54 49 9.1 -9 681.90 -53.7 -50.7 -53.6 73 -99 SPO 1997 10 08 20 55 49 9.1 -9 681.90 -53.7 -50.6 -53.6 73 -99 SPO 1997 10 08 20 56 49 9.2 -9 681.90 -53.7 -50.6 -53.6 73 -99 SPO 1997 10 08 20 57 49 9.2 -9 681.90 -53.7 -50.7 -53.6 72 -99 SPO 1997 10 08 20 58 49 8.9 -9 681.90 -53.6 -50.7 -53.5 71 -99 SPO 1997 10 08 20 59 49 8.8 -9 681.90 -53.6 -50.8 -53.4 71 -99 SPO 1997 10 08 21 00 49 8.7 -9 682.00 -53.6 -50.7 -53.4 71 0 SPO 1997 10 08 21 01 50 8.8 -9 682.00 -53.6 -50.8 -53.5 71 -99 SPO 1997 10 08 21 02 50 8.6 -9 682.00 -53.6 -50.8 -53.5 72 -99 SPO 1997 10 08 21 03 52 8.4 -9 682.00 -53.6 -50.9 -53.5 72 -99 SPO 1997 10 08 21 04 51 8.4 -9 682.00 -53.6 -50.9 -53.5 72 -99 SPO 1997 10 08 21 05 52 8.2 -9 682.00 -53.7 -51.0 -53.6 73 -99 SPO 1997 10 08 21 06 52 8.5 -9 682.00 -53.7 -51.0 -53.6 73 -99 SPO 1997 10 08 21 07 51 8.3 -9 682.00 -53.7 -51.0 -53.6 73 -99 SPO 1997 10 08 21 08 51 8.1 -9 682.00 -53.8 -51.2 -53.7 73 -99 SPO 1997 10 08 21 09 51 8.1 -9 682.00 -53.9 -51.2 -53.8 73 -99 SPO 1997 10 08 21 10 51 8.1 -9 682.00 -53.9 -51.2 -53.8 73 -99 SPO 1997 10 08 21 11 51 7.9 -9 682.00 -54.0 -51.2 -53.8 72 -99 SPO 1997 10 08 21 12 51 7.8 -9 682.00 -54.0 -51.4 -53.8 72 -99 SPO 1997 10 08 21 13 51 8.1 -9 682.00 -54.0 -51.2 -53.9 72 -99 SPO 1997 10 08 21 14 51 8.3 -9 682.00 -54.0 -51.2 -53.9 72 -99 SPO 1997 10 08 21 15 52 8.6 -9 681.90 -54.0 -51.1 -53.9 73 -99 SPO 1997 10 08 21 16 51 8.8 -9 681.90 -54.0 -51.0 -53.9 73 -99 SPO 1997 10 08 21 17 51 9.0 -9 681.90 -54.0 -50.9 -53.9 73 -99 SPO 1997 10 08 21 18 50 9.4 -9 681.90 -54.0 -50.7 -53.9 73 -99 SPO 1997 10 08 21 19 50 9.7 -9 681.80 -54.0 -50.6 -53.9 73 -99 SPO 1997 10 08 21 20 49 9.6 -9 681.80 -54.0 -50.4 -53.9 73 -99 SPO 1997 10 08 21 21 49 9.7 -9 681.80 -53.8 -50.4 -53.7 71 -99 SPO 1997 10 08 21 22 49 9.7 -9 681.80 -53.7 -50.2 -53.6 70 -99 SPO 1997 10 08 21 23 49 9.4 -9 681.90 -53.6 -50.2 -53.5 69 -99 SPO 1997 10 08 21 24 48 9.1 -9 681.90 -53.5 -50.2 -53.4 68 -99 SPO 1997 10 08 21 25 49 9.4 -9 681.90 -53.4 -50.2 -53.3 68 -99 SPO 1997 10 08 21 26 49 9.3 -9 681.90 -53.3 -50.2 -53.2 68 -99 SPO 1997 10 08 21 27 49 9.2 -9 681.80 -53.2 -50.2 -53.2 68 -99 SPO 1997 10 08 21 28 50 9.3 -9 681.90 -53.2 -50.4 -53.2 70 -99 SPO 1997 10 08 21 29 50 9.3 -9 681.90 -53.3 -50.4 -53.2 72 -99 SPO 1997 10 08 21 30 50 9.2 -9 681.90 -53.3 -50.3 -53.3 73 -99 SPO 1997 10 08 21 31 51 8.9 -9 681.90 -53.3 -50.4 -53.3 73 -99 SPO 1997 10 08 21 32 52 8.9 -9 681.90 -53.4 -50.4 -53.3 73 -99 SPO 1997 10 08 21 33 52 9.0 -9 681.90 -53.4 -50.4 -53.3 73 -99 SPO 1997 10 08 21 34 53 8.8 -9 682.00 -53.4 -50.4 -53.2 73 -99 SPO 1997 10 08 21 35 53 9.1 -9 681.90 -53.3 -50.3 -53.2 72 -99 SPO 1997 10 08 21 36 54 9.1 -9 681.90 -53.2 -50.2 -53.0 72 -99 SPO 1997 10 08 21 37 53 9.1 -9 681.90 -53.1 -50.2 -53.0 71 -99 SPO 1997 10 08 21 38 53 9.2 -9 681.90 -53.0 -50.2 -52.8 71 -99 SPO 1997 10 08 21 39 54 9.1 -9 681.90 -53.0 -50.2 -52.9 72 -99 SPO 1997 10 08 21 40 54 8.9 -9 681.90 -53.1 -50.2 -52.9 73 -99 SPO 1997 10 08 21 41 54 8.9 -9 681.90 -53.1 -50.3 -53.0 73 -99 SPO 1997 10 08 21 42 54 8.9 -9 681.90 -53.1 -50.4 -53.0 73 -99 SPO 1997 10 08 21 43 55 9.1 -9 681.90 -53.2 -50.5 -53.1 74 -99 SPO 1997 10 08 21 44 55 8.9 -9 681.90 -53.2 -50.5 -53.1 73 -99 SPO 1997 10 08 21 45 55 8.7 -9 682.00 -53.2 -50.6 -53.0 73 -99 SPO 1997 10 08 21 46 56 8.4 -9 682.00 -53.4 -50.8 -53.1 73 -99 SPO 1997 10 08 21 47 57 8.3 -9 682.00 -53.5 -50.8 -53.2 74 -99 SPO 1997 10 08 21 48 58 8.4 -9 682.00 -53.6 -50.8 -53.4 75 -99 SPO 1997 10 08 21 49 58 8.2 -9 682.00 -53.7 -50.8 -53.5 76 -99 SPO 1997 10 08 21 50 57 8.6 -9 682.00 -53.8 -50.8 -53.6 77 -99 SPO 1997 10 08 21 51 57 8.5 -9 681.90 -53.8 -50.6 -53.6 76 -99 SPO 1997 10 08 21 52 58 8.2 -9 681.90 -53.8 -50.6 -53.7 75 -99 SPO 1997 10 08 21 53 59 8.2 -9 681.90 -53.8 -50.7 -53.7 74 -99 SPO 1997 10 08 21 54 58 7.8 -9 681.90 -53.8 -50.8 -53.7 73 -99 SPO 1997 10 08 21 55 60 7.7 -9 682.00 -53.9 -51.0 -53.7 73 -99 SPO 1997 10 08 21 56 59 7.4 -9 682.00 -53.9 -51.0 -53.7 73 -99 SPO 1997 10 08 21 57 59 7.3 -9 682.00 -53.9 -51.2 -53.7 72 -99 SPO 1997 10 08 21 58 60 7.3 -9 682.00 -53.8 -51.2 -53.6 70 -99 SPO 1997 10 08 21 59 59 7.1 -9 682.00 -53.8 -51.2 -53.6 70 -99 SPO 1997 10 08 22 00 58 7.7 -9 682.00 -53.8 -51.2 -53.6 70 0 SPO 1997 10 08 22 01 57 8.0 -9 682.00 -53.8 -51.0 -53.5 70 -99 SPO 1997 10 08 22 02 57 7.9 -9 682.00 -53.7 -50.9 -53.4 70 -99 SPO 1997 10 08 22 03 57 7.8 -9 682.00 -53.7 -50.9 -53.4 71 -99 SPO 1997 10 08 22 04 56 8.0 -9 682.00 -53.8 -50.9 -53.4 72 -99 SPO 1997 10 08 22 05 56 7.8 -9 682.00 -53.7 -50.9 -53.4 72 -99 SPO 1997 10 08 22 06 55 7.7 -9 682.00 -53.8 -51.0 -53.5 73 -99 SPO 1997 10 08 22 07 56 7.7 -9 682.00 -53.9 -51.0 -53.6 73 -99 SPO 1997 10 08 22 08 56 7.9 -9 682.00 -53.9 -50.8 -53.6 73 -99 SPO 1997 10 08 22 09 55 7.7 -9 682.00 -53.8 -50.8 -53.6 71 -99 SPO 1997 10 08 22 10 55 7.6 -9 682.00 -53.9 -50.8 -53.6 71 -99 SPO 1997 10 08 22 11 54 7.8 -9 681.90 -53.9 -50.8 -53.6 71 -99 SPO 1997 10 08 22 12 54 8.2 -9 681.90 -53.8 -50.6 -53.5 70 -99 SPO 1997 10 08 22 13 53 8.1 -9 681.90 -53.7 -50.6 -53.4 69 -99 SPO 1997 10 08 22 14 53 8.2 -9 681.90 -53.6 -50.4 -53.3 68 -99 SPO 1997 10 08 22 15 51 8.0 -9 681.90 -53.5 -50.5 -53.2 69 -99 SPO 1997 10 08 22 16 52 8.5 -9 681.90 -53.4 -50.4 -53.2 70 -99 SPO 1997 10 08 22 17 53 8.7 -9 681.90 -53.4 -50.2 -53.1 70 -99 SPO 1997 10 08 22 18 53 8.7 -9 681.90 -53.3 -50.2 -53.0 70 -99 SPO 1997 10 08 22 19 55 8.2 -9 682.00 -53.3 -50.3 -53.0 71 -99 SPO 1997 10 08 22 20 56 7.8 -9 682.00 -53.3 -50.4 -53.0 71 -99 SPO 1997 10 08 22 21 57 7.6 -9 682.00 -53.3 -50.4 -53.0 71 -99 SPO 1997 10 08 22 22 57 7.8 -9 682.00 -53.3 -50.4 -53.0 71 -99 SPO 1997 10 08 22 23 57 7.6 -9 681.90 -53.2 -50.4 -52.9 70 -99 SPO 1997 10 08 22 24 57 7.8 -9 681.90 -53.2 -50.3 -52.9 71 -99 SPO 1997 10 08 22 25 56 7.9 -9 681.90 -53.1 -50.3 -52.8 70 -99 SPO 1997 10 08 22 26 55 8.0 -9 681.80 -53.0 -50.2 -52.7 70 -99 SPO 1997 10 08 22 27 55 8.1 -9 681.80 -53.0 -50.2 -52.7 70 -99 SPO 1997 10 08 22 28 55 8.2 -9 681.80 -53.0 -50.2 -52.7 71 -99 SPO 1997 10 08 22 29 54 8.3 -9 681.80 -52.9 -50.1 -52.6 70 -99 SPO 1997 10 08 22 30 53 8.4 -9 681.80 -52.8 -50.1 -52.6 69 -99 SPO 1997 10 08 22 31 52 8.3 -9 681.80 -52.8 -50.0 -52.5 70 -99 SPO 1997 10 08 22 32 52 8.6 -9 681.80 -52.8 -49.9 -52.4 70 -99 SPO 1997 10 08 22 33 52 8.4 -9 681.80 -52.8 -49.9 -52.4 70 -99 SPO 1997 10 08 22 34 52 8.3 -9 681.80 -52.8 -49.8 -52.4 70 -99 SPO 1997 10 08 22 35 53 8.0 -9 681.80 -52.6 -50.0 -52.3 70 -99 SPO 1997 10 08 22 36 53 8.2 -9 681.80 -52.6 -50.0 -52.3 70 -99 SPO 1997 10 08 22 37 53 8.2 -9 681.80 -52.5 -49.9 -52.2 70 -99 SPO 1997 10 08 22 38 54 8.1 -9 681.80 -52.4 -49.8 -52.1 70 -99 SPO 1997 10 08 22 39 56 8.0 -9 681.80 -52.4 -50.0 -52.1 71 -99 SPO 1997 10 08 22 40 57 7.9 -9 681.80 -52.3 -50.0 -52.0 71 -99 SPO 1997 10 08 22 41 58 8.1 -9 681.80 -52.2 -50.0 -52.0 70 -99 SPO 1997 10 08 22 42 59 7.6 -9 681.80 -52.2 -50.1 -52.0 70 -99 SPO 1997 10 08 22 43 60 7.5 -9 681.80 -52.3 -50.2 -52.1 71 -99 SPO 1997 10 08 22 44 59 7.5 -9 681.90 -52.3 -50.3 -52.2 70 -99 SPO 1997 10 08 22 45 61 7.2 -9 681.90 -52.5 -50.4 -52.4 73 -99 SPO 1997 10 08 22 46 60 7.2 -9 681.90 -52.6 -50.5 -52.4 74 -99 SPO 1997 10 08 22 47 60 7.2 -9 681.90 -52.7 -50.6 -52.5 75 -99 SPO 1997 10 08 22 48 62 7.3 -9 681.90 -52.7 -50.7 -52.4 74 -99 SPO 1997 10 08 22 49 63 7.3 -9 681.90 -52.8 -50.8 -52.5 75 -99 SPO 1997 10 08 22 50 65 7.4 -9 681.80 -52.9 -50.8 -52.6 74 -99 SPO 1997 10 08 22 51 65 7.4 -9 681.80 -53.0 -50.8 -52.6 75 -99 SPO 1997 10 08 22 52 66 7.3 -9 681.80 -53.0 -51.0 -52.7 74 -99 SPO 1997 10 08 22 53 67 7.2 -9 681.90 -53.1 -51.1 -52.8 74 -99 SPO 1997 10 08 22 54 68 7.2 -9 681.90 -53.3 -51.1 -53.0 74 -99 SPO 1997 10 08 22 55 68 7.1 -9 681.90 -53.5 -51.2 -53.2 74 -99 SPO 1997 10 08 22 56 68 7.2 -9 681.90 -53.7 -51.3 -53.4 75 -99 SPO 1997 10 08 22 57 68 7.0 -9 681.90 -53.9 -51.3 -53.6 75 -99 SPO 1997 10 08 22 58 68 6.8 -9 681.90 -54.2 -51.4 -53.8 77 -99 SPO 1997 10 08 22 59 69 6.6 -9 681.90 -54.2 -51.4 -53.9 75 -99 SPO 1997 10 08 23 00 69 6.2 -9 681.90 -54.3 -51.6 -53.9 74 0 SPO 1997 10 08 23 01 67 6.1 -9 681.80 -54.4 -51.9 -53.9 75 -99 SPO 1997 10 08 23 02 66 6.1 -9 681.80 -54.4 -52.0 -54.0 73 -99 SPO 1997 10 08 23 03 65 6.2 -9 681.80 -54.4 -52.0 -54.0 73 -99 SPO 1997 10 08 23 04 62 6.3 -9 681.80 -54.2 -51.8 -53.9 71 -99 SPO 1997 10 08 23 05 60 6.6 -9 681.80 -54.2 -51.7 -53.9 71 -99 SPO 1997 10 08 23 06 58 6.8 -9 681.80 -54.0 -51.6 -53.8 68 -99 SPO 1997 10 08 23 07 56 7.0 -9 681.80 -54.0 -51.3 -53.8 68 -99 SPO 1997 10 08 23 08 54 7.4 -9 681.80 -53.8 -51.2 -53.6 67 -99 SPO 1997 10 08 23 09 53 7.5 -9 681.80 -53.7 -51.0 -53.5 66 -99 SPO 1997 10 08 23 10 53 7.6 -9 681.70 -53.6 -51.0 -53.4 67 -99 SPO 1997 10 08 23 11 53 7.7 -9 681.70 -53.5 -50.8 -53.4 68 -99 SPO 1997 10 08 23 12 52 7.9 -9 681.70 -53.5 -50.7 -53.3 68 -99 SPO 1997 10 08 23 13 52 8.0 -9 681.70 -53.4 -50.6 -53.2 68 -99 SPO 1997 10 08 23 14 51 8.1 -9 681.70 -53.4 -50.6 -53.2 69 -99 SPO 1997 10 08 23 15 50 8.1 -9 681.70 -53.3 -50.5 -53.1 69 -99 SPO 1997 10 08 23 16 50 8.1 -9 681.70 -53.2 -50.4 -53.0 68 -99 SPO 1997 10 08 23 17 51 8.2 -9 681.70 -53.3 -50.4 -53.0 69 -99 SPO 1997 10 08 23 18 52 8.4 -9 681.70 -53.2 -50.3 -53.0 68 -99 SPO 1997 10 08 23 19 52 8.1 -9 681.70 -53.2 -50.4 -52.9 69 -99 SPO 1997 10 08 23 20 52 8.2 -9 681.70 -53.2 -50.4 -52.9 69 -99 SPO 1997 10 08 23 21 53 8.3 -9 681.70 -53.2 -50.5 -52.9 70 -99 SPO 1997 10 08 23 22 53 8.2 -9 681.70 -53.1 -50.4 -52.8 71 -99 SPO 1997 10 08 23 23 53 8.2 -9 681.80 -53.1 -50.4 -52.8 71 -99 SPO 1997 10 08 23 24 54 8.3 -9 681.80 -53.2 -50.4 -52.9 73 -99 SPO 1997 10 08 23 25 54 8.4 -9 681.80 -53.3 -50.4 -53.0 74 -99 SPO 1997 10 08 23 26 54 8.1 -9 681.80 -53.3 -50.4 -53.0 74 -99 SPO 1997 10 08 23 27 54 8.0 -9 681.80 -53.4 -50.4 -53.1 73 -99 SPO 1997 10 08 23 28 55 7.8 -9 681.80 -53.4 -50.5 -53.1 73 -99 SPO 1997 10 08 23 29 55 7.8 -9 681.80 -53.4 -50.6 -53.1 73 -99 SPO 1997 10 08 23 30 56 7.8 -9 681.80 -53.4 -50.6 -53.2 73 -99 SPO 1997 10 08 23 31 57 7.7 -9 681.80 -53.5 -50.7 -53.3 73 -99 SPO 1997 10 08 23 32 56 7.6 -9 681.80 -53.6 -50.7 -53.4 73 -99 SPO 1997 10 08 23 33 56 7.7 -9 681.80 -53.6 -50.7 -53.3 73 -99 SPO 1997 10 08 23 34 56 7.4 -9 681.80 -53.5 -50.8 -53.2 72 -99 SPO 1997 10 08 23 35 55 7.1 -9 681.90 -53.5 -50.8 -53.1 72 -99 SPO 1997 10 08 23 36 56 6.9 -9 681.90 -53.4 -50.9 -53.0 71 -99 SPO 1997 10 08 23 37 58 6.9 -9 681.90 -53.4 -50.9 -53.0 71 -99 SPO 1997 10 08 23 38 58 6.9 -9 681.90 -53.4 -50.8 -53.0 71 -99 SPO 1997 10 08 23 39 59 6.4 -9 681.90 -53.3 -50.9 -52.9 71 -99 SPO 1997 10 08 23 40 59 6.1 -9 681.90 -53.4 -51.1 -53.0 71 -99 SPO 1997 10 08 23 41 62 5.8 -9 681.90 -53.4 -51.1 -53.0 70 -99 SPO 1997 10 08 23 42 62 5.6 -9 681.90 -53.5 -51.2 -53.1 70 -99 SPO 1997 10 08 23 43 62 5.7 -9 681.90 -53.4 -51.2 -53.0 69 -99 SPO 1997 10 08 23 44 63 5.9 -9 681.90 -53.4 -51.2 -53.0 69 -99 SPO 1997 10 08 23 45 63 6.4 -9 681.90 -53.3 -51.0 -53.0 68 -99 SPO 1997 10 08 23 46 62 6.2 -9 681.90 -53.3 -51.0 -53.0 69 -99 SPO 1997 10 08 23 47 63 6.1 -9 681.90 -53.3 -51.1 -52.9 69 -99 SPO 1997 10 08 23 48 66 5.8 -9 681.90 -53.2 -51.2 -52.8 68 -99 SPO 1997 10 08 23 49 68 5.0 -9 682.00 -53.2 -51.6 -52.8 69 -99 SPO 1997 10 08 23 50 66 5.3 -9 681.90 -53.3 -51.8 -52.9 71 -99 SPO 1997 10 08 23 51 65 5.7 -9 681.90 -53.4 -51.7 -53.0 71 -99 SPO 1997 10 08 23 52 65 5.6 -9 681.90 -53.4 -51.5 -53.0 70 -99 SPO 1997 10 08 23 53 64 5.6 -9 681.90 -53.4 -51.5 -53.0 70 -99 SPO 1997 10 08 23 54 64 5.3 -9 681.90 -53.5 -51.7 -53.0 70 -99 SPO 1997 10 08 23 55 62 5.8 -9 681.90 -53.4 -51.7 -53.0 68 -99 SPO 1997 10 08 23 56 60 6.1 -9 681.90 -53.5 -51.5 -53.0 69 -99 SPO 1997 10 08 23 57 58 6.6 -9 681.90 -53.4 -51.3 -53.0 68 -99 SPO 1997 10 08 23 58 58 6.9 -9 681.90 -53.3 -51.1 -52.9 -99 -99 SPO 1997 10 08 23 59 58 7.1 -9 681.90 -53.2 -50.9 -52.8 -99 -99 SPO 1997 10 09 00 00 57 6.9 -9 681.80 -53.2 -50.9 -52.8 -99 0 SPO 1997 10 09 00 01 57 7.1 -9 681.90 -53.1 -50.8 -52.8 -99 -99 SPO 1997 10 09 00 02 58 6.7 -9 681.90 -53.0 -50.8 -52.7 -99 -99 SPO 1997 10 09 00 03 56 7.2 -9 681.90 -53.0 -50.7 -52.7 69 -99 SPO 1997 10 09 00 04 55 7.3 -9 681.90 -52.9 -50.6 -52.6 69 -99 SPO 1997 10 09 00 05 56 7.1 -9 681.90 -52.9 -50.7 -52.6 69 -99 SPO 1997 10 09 00 06 56 7.7 -9 681.90 -52.8 -50.7 -52.6 69 -99 SPO 1997 10 09 00 07 55 7.8 -9 681.90 -52.8 -50.6 -52.5 69 -99 SPO 1997 10 09 00 08 55 7.5 -9 681.90 -52.8 -50.6 -52.5 69 -99 SPO 1997 10 09 00 09 55 7.4 -9 681.90 -52.8 -50.6 -52.5 70 -99 SPO 1997 10 09 00 10 54 7.3 -9 681.90 -52.8 -50.6 -52.4 70 -99 SPO 1997 10 09 00 11 54 7.6 -9 681.80 -52.8 -50.5 -52.4 71 -99 SPO 1997 10 09 00 12 54 8.0 -9 681.80 -52.8 -50.4 -52.4 71 -99 SPO 1997 10 09 00 13 54 8.6 -9 681.80 -52.7 -50.3 -52.4 70 -99 SPO 1997 10 09 00 14 54 8.6 -9 681.80 -52.7 -50.2 -52.4 71 -99 SPO 1997 10 09 00 15 53 8.6 -9 681.80 -52.7 -50.2 -52.4 71 -99 SPO 1997 10 09 00 16 53 8.8 -9 681.70 -52.7 -50.0 -52.4 71 -99 SPO 1997 10 09 00 17 53 8.8 -9 681.70 -52.8 -50.0 -52.5 72 -99 SPO 1997 10 09 00 18 54 9.1 -9 681.70 -52.7 -49.9 -52.4 70 -99 SPO 1997 10 09 00 19 54 8.9 -9 681.70 -52.7 -49.8 -52.4 70 -99 SPO 1997 10 09 00 20 53 9.1 -9 681.70 -52.7 -49.8 -52.4 71 -99 SPO 1997 10 09 00 21 53 9.1 -9 681.70 -52.6 -49.7 -52.3 71 -99 SPO 1997 10 09 00 22 53 9.0 -9 681.70 -52.6 -49.8 -52.3 71 -99 SPO 1997 10 09 00 23 53 8.9 -9 681.70 -52.6 -49.8 -52.4 72 -99 SPO 1997 10 09 00 24 53 8.6 -9 681.80 -52.7 -49.8 -52.4 73 -99 SPO 1997 10 09 00 25 53 8.9 -9 681.70 -52.6 -49.8 -52.4 72 -99 SPO 1997 10 09 00 26 53 9.0 -9 681.80 -52.6 -49.6 -52.3 72 -99 SPO 1997 10 09 00 27 53 8.9 -9 681.80 -52.5 -49.5 -52.3 71 -99 SPO 1997 10 09 00 28 52 8.6 -9 681.80 -52.4 -49.8 -52.3 70 -99 SPO 1997 10 09 00 29 51 8.8 -9 681.80 -52.5 -49.8 -52.3 71 -99 SPO 1997 10 09 00 30 51 9.0 -9 681.80 -52.4 -49.8 -52.3 70 -99 SPO 1997 10 09 00 31 49 8.5 -9 681.80 -52.4 -49.7 -52.2 70 -99 SPO 1997 10 09 00 32 50 9.0 -9 681.80 -52.2 -49.8 -52.1 69 -99 SPO 1997 10 09 00 33 49 8.7 -9 681.80 -52.2 -49.6 -52.0 69 -99 SPO 1997 10 09 00 34 49 9.0 -9 681.80 -52.2 -49.5 -52.0 69 -99 SPO 1997 10 09 00 35 51 8.9 -9 681.80 -52.0 -49.4 -51.8 69 -99 SPO 1997 10 09 00 36 49 8.9 -9 681.80 -51.9 -49.3 -51.8 69 -99 SPO 1997 10 09 00 37 49 8.7 -9 681.80 -52.0 -49.3 -51.8 71 -99 SPO 1997 10 09 00 38 50 9.0 -9 681.80 -52.0 -49.5 -51.8 71 -99 SPO 1997 10 09 00 39 50 9.4 -9 681.70 -51.9 -49.2 -51.7 70 -99 SPO 1997 10 09 00 40 48 9.0 -9 681.80 -51.9 -49.1 -51.7 71 -99 SPO 1997 10 09 00 41 48 8.7 -9 681.80 -51.9 -49.4 -51.8 70 -99 SPO 1997 10 09 00 42 48 8.7 -9 681.80 -52.0 -49.4 -51.9 72 -99 SPO 1997 10 09 00 43 49 8.7 -9 681.80 -51.9 -49.4 -51.8 71 -99 SPO 1997 10 09 00 44 49 8.6 -9 681.80 -51.9 -49.4 -51.8 71 -99 SPO 1997 10 09 00 45 49 8.9 -9 681.80 -51.9 -49.2 -51.8 72 -99 SPO 1997 10 09 00 46 49 8.9 -9 681.80 -51.9 -49.0 -51.8 72 -99 SPO 1997 10 09 00 47 49 8.6 -9 681.80 -51.9 -49.1 -51.8 72 -99 SPO 1997 10 09 00 48 49 8.7 -9 681.80 -51.8 -49.3 -51.7 71 -99 SPO 1997 10 09 00 49 49 8.6 -9 681.80 -51.8 -49.2 -51.7 70 -99 SPO 1997 10 09 00 50 48 8.2 -9 681.80 -51.9 -49.3 -51.7 71 -99 SPO 1997 10 09 00 51 48 8.4 -9 681.80 -51.9 -49.4 -51.7 71 -99 SPO 1997 10 09 00 52 48 8.3 -9 681.80 -52.0 -49.6 -51.8 72 -99 SPO 1997 10 09 00 53 48 8.4 -9 681.80 -52.1 -49.6 -51.9 72 -99 SPO 1997 10 09 00 54 49 8.6 -9 681.80 -52.0 -49.4 -51.8 71 -99 SPO 1997 10 09 00 55 50 8.3 -9 681.80 -52.0 -49.3 -51.8 71 -99 SPO 1997 10 09 00 56 49 8.8 -9 681.80 -52.0 -49.2 -51.8 71 -99 SPO 1997 10 09 00 57 48 8.4 -9 681.80 -52.0 -49.0 -51.7 72 -99 SPO 1997 10 09 00 58 50 8.5 -9 681.80 -52.0 -49.1 -51.7 73 -99 SPO 1997 10 09 00 59 50 8.7 -9 681.80 -52.0 -49.0 -51.7 73 -99 SPO 1997 10 09 01 00 51 8.6 -9 681.80 -52.0 -49.0 -51.8 73 0 SPO 1997 10 09 01 01 49 8.9 -9 681.80 -52.0 -48.9 -51.8 73 -99 SPO 1997 10 09 01 02 50 8.8 -9 681.80 -52.0 -48.8 -51.8 72 -99 SPO 1997 10 09 01 03 50 9.1 -9 681.80 -52.0 -48.6 -51.8 71 -99 SPO 1997 10 09 01 04 51 8.9 -9 681.80 -52.0 -48.4 -51.8 70 -99 SPO 1997 10 09 01 05 50 8.8 -9 681.80 -52.0 -48.4 -51.7 70 -99 SPO 1997 10 09 01 06 51 8.5 -9 681.80 -52.0 -48.4 -51.8 71 -99 SPO 1997 10 09 01 07 51 8.5 -9 681.80 -52.1 -48.5 -51.8 72 -99 SPO 1997 10 09 01 08 49 8.2 -9 681.80 -52.1 -48.6 -51.8 72 -99 SPO 1997 10 09 01 09 50 8.2 -9 681.80 -52.1 -48.8 -51.9 72 -99 SPO 1997 10 09 01 10 51 8.1 -9 681.80 -52.2 -48.6 -51.9 73 -99 SPO 1997 10 09 01 11 51 7.8 -9 681.80 -52.2 -48.8 -51.9 74 -99 SPO 1997 10 09 01 12 50 7.6 -9 681.80 -52.3 -48.9 -52.0 74 -99 SPO 1997 10 09 01 13 50 7.5 -9 681.80 -52.3 -49.0 -52.0 74 -99 SPO 1997 10 09 01 14 51 7.4 -9 681.80 -52.4 -49.0 -52.1 73 -99 SPO 1997 10 09 01 15 52 7.5 -9 681.80 -52.3 -49.0 -52.1 72 -99 SPO 1997 10 09 01 16 51 7.4 -9 681.80 -52.3 -49.0 -52.0 71 -99 SPO 1997 10 09 01 17 51 7.3 -9 681.80 -52.3 -49.1 -52.1 71 -99 SPO 1997 10 09 01 18 51 7.6 -9 681.80 -52.4 -49.1 -52.1 72 -99 SPO 1997 10 09 01 19 51 7.5 -9 681.80 -52.4 -49.2 -52.2 72 -99 SPO 1997 10 09 01 20 49 7.5 -9 681.80 -52.4 -49.1 -52.2 72 -99 SPO 1997 10 09 01 21 49 7.8 -9 681.80 -52.5 -49.0 -52.3 73 -99 SPO 1997 10 09 01 22 48 8.0 -9 681.80 -52.4 -48.9 -52.2 72 -99 SPO 1997 10 09 01 23 48 8.0 -9 681.80 -52.4 -48.9 -52.2 71 -99 SPO 1997 10 09 01 24 48 7.9 -9 681.80 -52.4 -48.9 -52.2 71 -99 SPO 1997 10 09 01 25 47 8.0 -9 681.80 -52.3 -48.9 -52.2 70 -99 SPO 1997 10 09 01 26 48 8.0 -9 681.80 -52.3 -48.9 -52.2 69 -99 SPO 1997 10 09 01 27 48 7.8 -9 681.80 -52.3 -48.9 -52.2 70 -99 SPO 1997 10 09 01 28 48 8.1 -9 681.80 -52.3 -48.8 -52.2 69 -99 SPO 1997 10 09 01 29 48 8.1 -9 681.80 -52.3 -48.8 -52.2 69 -99 SPO 1997 10 09 01 30 47 7.9 -9 681.80 -52.3 -48.8 -52.2 69 -99 SPO 1997 10 09 01 31 47 8.4 -9 681.80 -52.3 -48.8 -52.2 70 -99 SPO 1997 10 09 01 32 47 8.5 -9 681.80 -52.2 -48.7 -52.2 69 -99 SPO 1997 10 09 01 33 47 8.4 -9 681.80 -52.3 -48.7 -52.2 71 -99 SPO 1997 10 09 01 34 47 8.4 -9 681.80 -52.3 -48.7 -52.2 71 -99 SPO 1997 10 09 01 35 47 8.2 -9 681.80 -52.3 -48.6 -52.2 70 -99 SPO 1997 10 09 01 36 47 7.9 -9 681.80 -52.3 -48.6 -52.2 69 -99 SPO 1997 10 09 01 37 46 7.8 -9 681.80 -52.3 -48.7 -52.2 69 -99 SPO 1997 10 09 01 38 46 7.8 -9 681.90 -52.2 -48.8 -52.1 68 -99 SPO 1997 10 09 01 39 45 7.6 -9 681.90 -52.2 -49.0 -52.1 67 -99 SPO 1997 10 09 01 40 45 7.4 -9 681.90 -52.2 -49.1 -52.1 67 -99 SPO 1997 10 09 01 41 46 7.3 -9 681.90 -52.2 -49.2 -52.1 67 -99 SPO 1997 10 09 01 42 46 7.0 -9 681.90 -52.2 -49.3 -52.0 68 -99 SPO 1997 10 09 01 43 45 7.3 -9 681.90 -52.1 -49.3 -52.0 67 -99 SPO 1997 10 09 01 44 44 7.1 -9 681.90 -52.0 -49.2 -51.8 67 -99 SPO 1997 10 09 01 45 43 7.3 -9 681.90 -51.7 -49.1 -51.6 65 -99 SPO 1997 10 09 01 46 42 7.8 -9 681.90 -51.3 -48.9 -51.2 63 -99 SPO 1997 10 09 01 47 42 7.8 -9 681.90 -51.0 -48.8 -51.0 63 -99 SPO 1997 10 09 01 48 41 8.6 -9 681.90 -51.0 -48.7 -50.9 65 -99 SPO 1997 10 09 01 49 41 8.8 -9 681.80 -50.8 -48.4 -50.8 65 -99 SPO 1997 10 09 01 50 41 8.7 -9 681.80 -50.8 -48.4 -50.7 67 -99 SPO 1997 10 09 01 51 41 8.8 -9 681.80 -50.7 -48.3 -50.7 66 -99 SPO 1997 10 09 01 52 40 8.8 -9 681.80 -50.8 -48.4 -50.7 67 -99 SPO 1997 10 09 01 53 40 9.2 -9 681.80 -50.7 -48.3 -50.6 67 -99 SPO 1997 10 09 01 54 41 9.1 -9 681.80 -50.7 -48.3 -50.6 68 -99 SPO 1997 10 09 01 55 41 9.2 -9 681.80 -50.7 -48.3 -50.6 69 -99 SPO 1997 10 09 01 56 41 8.9 -9 681.80 -50.7 -48.4 -50.6 70 -99 SPO 1997 10 09 01 57 41 8.7 -9 681.80 -50.8 -48.4 -50.6 71 -99 SPO 1997 10 09 01 58 42 8.7 -9 681.80 -50.7 -48.4 -50.6 71 -99 SPO 1997 10 09 01 59 44 8.8 -9 681.80 -50.6 -48.4 -50.6 70 -99 SPO 1997 10 09 02 00 43 8.3 -9 681.80 -50.6 -48.5 -50.4 70 0 SPO 1997 10 09 02 01 44 7.8 -9 681.90 -50.6 -48.7 -50.4 70 -99 SPO 1997 10 09 02 02 45 7.4 -9 681.90 -50.6 -48.7 -50.5 70 -99 SPO 1997 10 09 02 03 47 7.2 -9 681.90 -50.7 -48.8 -50.6 71 -99 SPO 1997 10 09 02 04 49 7.1 -9 681.90 -50.8 -48.8 -50.6 71 -99 SPO 1997 10 09 02 05 50 6.9 -9 681.90 -50.9 -48.9 -50.7 72 -99 SPO 1997 10 09 02 06 50 6.7 -9 681.90 -50.9 -48.9 -50.7 73 -99 SPO 1997 10 09 02 07 51 6.7 -9 681.90 -51.0 -48.9 -50.8 73 -99 SPO 1997 10 09 02 08 53 6.5 -9 681.90 -51.0 -48.9 -50.8 73 -99 SPO 1997 10 09 02 09 53 6.1 -9 681.90 -51.1 -49.1 -50.8 74 -99 SPO 1997 10 09 02 10 53 6.2 -9 681.90 -51.1 -49.1 -50.8 74 -99 SPO 1997 10 09 02 11 52 6.2 -9 681.90 -51.2 -49.0 -50.8 75 -99 SPO 1997 10 09 02 12 52 6.0 -9 681.90 -51.1 -48.9 -50.8 73 -99 SPO 1997 10 09 02 13 51 5.9 -9 681.90 -51.1 -49.0 -50.8 72 -99 SPO 1997 10 09 02 14 52 5.9 -9 682.00 -51.0 -49.0 -50.8 71 -99 SPO 1997 10 09 02 15 51 6.2 -9 682.00 -50.9 -48.8 -50.6 70 -99 SPO 1997 10 09 02 16 52 6.3 -9 682.00 -50.6 -48.7 -50.4 68 -99 SPO 1997 10 09 02 17 52 6.4 -9 681.90 -50.6 -48.6 -50.4 68 -99 SPO 1997 10 09 02 18 51 6.5 -9 681.90 -50.5 -48.6 -50.3 69 -99 SPO 1997 10 09 02 19 50 6.3 -9 681.90 -50.4 -48.6 -50.3 69 -99 SPO 1997 10 09 02 20 50 6.5 -9 681.90 -50.3 -48.5 -50.2 69 -99 SPO 1997 10 09 02 21 49 6.5 -9 681.90 -50.3 -48.4 -50.2 69 -99 SPO 1997 10 09 02 22 50 6.5 -9 681.90 -50.2 -48.4 -50.0 68 -99 SPO 1997 10 09 02 23 50 6.5 -9 681.90 -50.2 -48.4 -50.1 70 -99 SPO 1997 10 09 02 24 50 6.7 -9 681.90 -50.2 -48.4 -50.0 70 -99 SPO 1997 10 09 02 25 50 6.6 -9 682.00 -50.2 -48.4 -50.1 71 -99 SPO 1997 10 09 02 26 50 6.9 -9 682.00 -50.3 -48.4 -50.1 72 -99 SPO 1997 10 09 02 27 50 6.7 -9 682.00 -50.2 -48.4 -50.0 71 -99 SPO 1997 10 09 02 28 50 6.6 -9 682.00 -50.3 -48.4 -50.1 72 -99 SPO 1997 10 09 02 29 51 6.6 -9 682.00 -50.3 -48.4 -50.1 72 -99 SPO 1997 10 09 02 30 51 6.5 -9 682.00 -50.3 -48.5 -50.0 71 -99 SPO 1997 10 09 02 31 51 6.4 -9 682.00 -50.3 -48.5 -50.0 71 -99 SPO 1997 10 09 02 32 52 6.3 -9 682.00 -50.3 -48.5 -50.0 72 -99 SPO 1997 10 09 02 33 52 6.4 -9 682.00 -50.3 -48.5 -50.0 72 -99 SPO 1997 10 09 02 34 49 6.4 -9 682.00 -50.2 -48.5 -50.0 71 -99 SPO 1997 10 09 02 35 48 6.6 -9 682.00 -50.2 -48.4 -50.0 72 -99 SPO 1997 10 09 02 36 47 6.7 -9 682.00 -50.1 -48.4 -49.9 71 -99 SPO 1997 10 09 02 37 46 7.1 -9 682.00 -50.0 -48.2 -49.8 70 -99 SPO 1997 10 09 02 38 45 7.3 -9 681.90 -49.8 -48.1 -49.6 68 -99 SPO 1997 10 09 02 39 44 7.8 -9 681.90 -49.8 -48.1 -49.6 68 -99 SPO 1997 10 09 02 40 43 7.9 -9 681.90 -49.6 -48.0 -49.4 68 -99 SPO 1997 10 09 02 41 43 8.4 -9 681.90 -49.6 -47.8 -49.4 69 -99 SPO 1997 10 09 02 42 43 8.6 -9 681.90 -49.5 -47.7 -49.3 69 -99 SPO 1997 10 09 02 43 43 8.5 -9 681.80 -49.5 -47.8 -49.3 71 -99 SPO 1997 10 09 02 44 43 8.5 -9 681.80 -49.5 -47.8 -49.4 73 -99 SPO 1997 10 09 02 45 43 8.4 -9 681.90 -49.5 -47.7 -49.3 73 -99 SPO 1997 10 09 02 46 44 8.4 -9 681.90 -49.5 -47.8 -49.4 73 -99 SPO 1997 10 09 02 47 45 8.3 -9 681.90 -49.5 -47.7 -49.4 73 -99 SPO 1997 10 09 02 48 45 8.1 -9 681.80 -49.6 -47.8 -49.4 75 -99 SPO 1997 10 09 02 49 46 8.0 -9 681.80 -49.6 -47.8 -49.5 75 -99 SPO 1997 10 09 02 50 47 8.0 -9 681.80 -49.8 -47.8 -49.6 76 -99 SPO 1997 10 09 02 51 47 7.8 -9 681.80 -49.9 -47.8 -49.7 74 -99 SPO 1997 10 09 02 52 47 7.4 -9 681.90 -49.9 -47.8 -49.7 74 -99 SPO 1997 10 09 02 53 48 7.3 -9 681.90 -50.0 -47.9 -49.8 74 -99 SPO 1997 10 09 02 54 48 7.0 -9 681.90 -50.1 -48.0 -49.8 74 -99 SPO 1997 10 09 02 55 49 6.8 -9 681.90 -50.2 -48.0 -50.0 74 -99 SPO 1997 10 09 02 56 50 6.5 -9 681.90 -50.3 -48.1 -50.0 74 -99 SPO 1997 10 09 02 57 51 6.2 -9 681.90 -50.4 -48.2 -50.1 75 -99 SPO 1997 10 09 02 58 53 6.0 -9 681.90 -50.5 -48.2 -50.2 74 -99 SPO 1997 10 09 02 59 54 6.0 -9 681.90 -50.6 -48.2 -50.4 75 -99 SPO 1997 10 09 03 00 54 6.3 -9 681.90 -50.8 -48.1 -50.4 75 0 SPO 1997 10 09 03 01 53 6.4 -9 681.90 -50.7 -48.1 -50.4 72 -99 SPO 1997 10 09 03 02 54 6.5 -9 681.90 -50.6 -48.1 -50.4 71 -99 SPO 1997 10 09 03 03 55 6.3 -9 681.90 -50.5 -48.1 -50.3 69 -99 SPO 1997 10 09 03 04 57 6.3 -9 681.90 -50.6 -48.2 -50.4 70 -99 SPO 1997 10 09 03 05 56 6.2 -9 681.90 -50.7 -48.2 -50.4 71 -99 SPO 1997 10 09 03 06 57 6.0 -9 681.90 -50.7 -48.3 -50.5 71 -99 SPO 1997 10 09 03 07 56 6.3 -9 681.90 -50.8 -48.3 -50.5 71 -99 SPO 1997 10 09 03 08 56 6.3 -9 681.90 -50.8 -48.2 -50.6 71 -99 SPO 1997 10 09 03 09 55 6.5 -9 681.90 -50.8 -48.3 -50.5 71 -99 SPO 1997 10 09 03 10 55 6.7 -9 681.90 -50.8 -48.3 -50.5 70 -99 SPO 1997 10 09 03 11 55 6.8 -9 681.90 -50.7 -48.3 -50.5 70 -99 SPO 1997 10 09 03 12 54 7.0 -9 681.90 -50.8 -48.2 -50.6 71 -99 SPO 1997 10 09 03 13 51 6.9 -9 681.90 -50.8 -48.1 -50.6 71 -99 SPO 1997 10 09 03 14 50 6.7 -9 681.90 -50.8 -48.0 -50.6 71 -99 SPO 1997 10 09 03 15 49 6.5 -9 681.90 -50.8 -48.0 -50.6 70 -99 SPO 1997 10 09 03 16 48 6.5 -9 681.90 -50.8 -48.0 -50.6 70 -99 SPO 1997 10 09 03 17 48 6.7 -9 681.90 -50.5 -47.8 -50.3 67 -99 SPO 1997 10 09 03 18 47 6.7 -9 681.90 -50.4 -47.8 -50.2 68 -99 SPO 1997 10 09 03 19 46 7.0 -9 681.90 -50.3 -47.7 -50.1 68 -99 SPO 1997 10 09 03 20 46 8.1 -9 681.80 -50.0 -47.5 -49.8 67 -99 SPO 1997 10 09 03 21 45 8.3 -9 681.80 -49.6 -47.3 -49.4 65 -99 SPO 1997 10 09 03 22 46 8.2 -9 681.80 -49.4 -47.3 -49.4 65 -99 SPO 1997 10 09 03 23 46 8.2 -9 681.80 -49.5 -47.3 -49.4 68 -99 SPO 1997 10 09 03 24 46 8.5 -9 681.80 -49.6 -47.2 -49.5 70 -99 SPO 1997 10 09 03 25 46 8.6 -9 681.80 -49.5 -47.2 -49.5 69 -99 SPO 1997 10 09 03 26 47 8.4 -9 681.80 -49.4 -47.2 -49.4 69 -99 SPO 1997 10 09 03 27 47 8.4 -9 681.90 -49.4 -47.3 -49.4 70 -99 SPO 1997 10 09 03 28 48 8.1 -9 681.90 -49.2 -47.4 -49.2 69 -99 SPO 1997 10 09 03 29 47 8.0 -9 681.90 -49.3 -47.4 -49.2 71 -99 SPO 1997 10 09 03 30 48 8.1 -9 681.90 -49.3 -47.4 -49.2 72 -99 SPO 1997 10 09 03 31 48 8.1 -9 681.80 -49.2 -47.3 -49.1 72 -99 SPO 1997 10 09 03 32 47 8.4 -9 681.80 -49.1 -47.3 -49.0 72 -99 SPO 1997 10 09 03 33 48 8.4 -9 681.80 -49.1 -47.2 -49.0 73 -99 SPO 1997 10 09 03 34 47 8.7 -9 681.80 -49.0 -47.2 -48.9 73 -99 SPO 1997 10 09 03 35 48 8.6 -9 681.80 -49.0 -47.2 -48.9 73 -99 SPO 1997 10 09 03 36 49 8.6 -9 681.80 -48.9 -47.2 -48.8 72 -99 SPO 1997 10 09 03 37 48 8.7 -9 681.80 -48.8 -47.2 -48.7 71 -99 SPO 1997 10 09 03 38 49 8.8 -9 681.80 -48.8 -47.2 -48.8 72 -99 SPO 1997 10 09 03 39 49 8.5 -9 681.80 -48.8 -47.2 -48.8 72 -99 SPO 1997 10 09 03 40 49 8.5 -9 681.80 -48.8 -47.2 -48.7 72 -99 SPO 1997 10 09 03 41 49 8.1 -9 681.90 -48.8 -47.3 -48.7 72 -99 SPO 1997 10 09 03 42 51 8.4 -9 681.90 -48.7 -47.3 -48.6 72 -99 SPO 1997 10 09 03 43 51 8.0 -9 681.90 -48.7 -47.4 -48.6 72 -99 SPO 1997 10 09 03 44 52 7.9 -9 681.90 -48.9 -47.5 -48.8 74 -99 SPO 1997 10 09 03 45 53 7.8 -9 681.90 -49.0 -47.6 -48.8 75 -99 SPO 1997 10 09 03 46 54 7.5 -9 681.90 -49.0 -47.6 -48.8 75 -99 SPO 1997 10 09 03 47 54 7.5 -9 681.90 -49.2 -47.7 -49.0 76 -99 SPO 1997 10 09 03 48 55 7.3 -9 681.90 -49.3 -47.7 -49.1 77 -99 SPO 1997 10 09 03 49 55 7.2 -9 681.90 -49.3 -47.7 -49.1 75 -99 SPO 1997 10 09 03 50 55 7.0 -9 681.90 -49.4 -47.8 -49.1 74 -99 SPO 1997 10 09 03 51 57 6.9 -9 681.90 -49.3 -47.8 -49.1 73 -99 SPO 1997 10 09 03 52 57 6.9 -9 681.90 -49.2 -47.8 -49.0 73 -99 SPO 1997 10 09 03 53 57 6.7 -9 682.00 -49.4 -47.9 -49.2 74 -99 SPO 1997 10 09 03 54 57 6.5 -9 682.00 -49.5 -47.9 -49.3 74 -99 SPO 1997 10 09 03 55 57 6.8 -9 682.00 -49.5 -47.9 -49.4 74 -99 SPO 1997 10 09 03 56 57 6.6 -9 682.00 -49.5 -47.9 -49.3 73 -99 SPO 1997 10 09 03 57 57 6.6 -9 682.00 -49.6 -47.9 -49.4 74 -99 SPO 1997 10 09 03 58 57 6.3 -9 682.00 -49.7 -48.0 -49.4 73 -99 SPO 1997 10 09 03 59 57 6.5 -9 682.00 -49.7 -48.0 -49.5 73 -99 SPO 1997 10 09 04 00 57 6.3 -9 682.00 -49.7 -48.1 -49.5 73 0 SPO 1997 10 09 04 01 56 6.7 -9 682.00 -49.8 -48.1 -49.6 73 -99 SPO 1997 10 09 04 02 56 6.8 -9 682.00 -49.9 -48.0 -49.6 73 -99 SPO 1997 10 09 04 03 56 6.7 -9 682.00 -49.9 -47.9 -49.6 72 -99 SPO 1997 10 09 04 04 56 6.5 -9 682.00 -50.0 -48.0 -49.7 72 -99 SPO 1997 10 09 04 05 55 6.3 -9 682.00 -50.0 -48.0 -49.8 72 -99 SPO 1997 10 09 04 06 55 6.5 -9 682.00 -50.0 -48.0 -49.8 72 -99 SPO 1997 10 09 04 07 54 6.7 -9 682.00 -50.0 -48.0 -49.8 72 -99 SPO 1997 10 09 04 08 55 6.9 -9 681.90 -50.0 -47.9 -49.8 72 -99 SPO 1997 10 09 04 09 55 7.0 -9 681.90 -50.0 -47.9 -49.8 72 -99 SPO 1997 10 09 04 10 56 7.1 -9 681.90 -50.0 -47.8 -49.8 72 -99 SPO 1997 10 09 04 11 57 7.0 -9 681.90 -50.0 -47.8 -49.9 72 -99 SPO 1997 10 09 04 12 58 7.0 -9 681.90 -50.1 -47.9 -49.9 72 -99 SPO 1997 10 09 04 13 57 7.0 -9 681.90 -50.2 -47.9 -50.0 72 -99 SPO 1997 10 09 04 14 57 6.9 -9 681.90 -50.1 -47.9 -49.9 71 -99 SPO 1997 10 09 04 15 57 6.8 -9 681.90 -50.3 -47.9 -50.1 72 -99 SPO 1997 10 09 04 16 55 6.6 -9 681.90 -50.3 -48.0 -50.1 72 -99 SPO 1997 10 09 04 17 53 6.8 -9 682.00 -50.3 -48.0 -50.1 71 -99 SPO 1997 10 09 04 18 53 6.9 -9 682.00 -50.1 -47.8 -50.0 69 -99 SPO 1997 10 09 04 19 52 7.0 -9 682.00 -50.0 -47.8 -49.8 69 -99 SPO 1997 10 09 04 20 52 7.1 -9 682.00 -49.8 -47.8 -49.6 68 -99 SPO 1997 10 09 04 21 52 7.3 -9 682.00 -49.7 -47.7 -49.5 68 -99 SPO 1997 10 09 04 22 51 7.5 -9 682.00 -49.6 -47.7 -49.4 68 -99 SPO 1997 10 09 04 23 51 7.7 -9 682.00 -49.4 -47.6 -49.4 68 -99 SPO 1997 10 09 04 24 51 7.5 -9 682.00 -49.3 -47.6 -49.2 68 -99 SPO 1997 10 09 04 25 50 8.0 -9 682.00 -49.2 -47.5 -49.2 69 -99 SPO 1997 10 09 04 26 51 7.8 -9 682.00 -49.2 -47.4 -49.2 70 -99 SPO 1997 10 09 04 27 51 7.7 -9 682.00 -49.2 -47.5 -49.2 70 -99 SPO 1997 10 09 04 28 51 7.6 -9 681.90 -49.2 -47.4 -49.1 71 -99 SPO 1997 10 09 04 29 52 7.9 -9 681.90 -49.2 -47.4 -49.1 71 -99 SPO 1997 10 09 04 30 53 7.5 -9 682.00 -49.1 -47.5 -49.1 70 -99 SPO 1997 10 09 04 31 54 7.3 -9 682.00 -49.2 -47.6 -49.2 72 -99 SPO 1997 10 09 04 32 53 7.2 -9 682.00 -49.3 -47.6 -49.2 73 -99 SPO 1997 10 09 04 33 54 6.9 -9 682.00 -49.4 -47.8 -49.4 74 -99 SPO 1997 10 09 04 34 54 6.8 -9 682.00 -49.5 -47.8 -49.4 74 -99 SPO 1997 10 09 04 35 56 6.1 -9 682.00 -49.8 -47.9 -49.6 77 -99 SPO 1997 10 09 04 36 56 5.9 -9 682.00 -50.2 -48.0 -50.0 79 -99 SPO 1997 10 09 04 37 56 5.8 -9 682.00 -50.6 -48.0 -50.3 79 -99 SPO 1997 10 09 04 38 56 5.9 -9 682.00 -50.6 -48.0 -50.4 78 -99 SPO 1997 10 09 04 39 56 5.7 -9 682.00 -50.8 -48.0 -50.5 77 -99 SPO 1997 10 09 04 40 56 5.9 -9 682.00 -50.8 -48.0 -50.6 75 -99 SPO 1997 10 09 04 41 55 5.7 -9 682.00 -50.8 -47.9 -50.6 72 -99 SPO 1997 10 09 04 42 55 6.1 -9 682.00 -50.8 -47.9 -50.5 71 -99 SPO 1997 10 09 04 43 54 6.4 -9 682.00 -50.5 -47.8 -50.3 68 -99 SPO 1997 10 09 04 44 54 6.8 -9 682.00 -50.0 -47.7 -49.8 64 -99 SPO 1997 10 09 04 45 52 7.0 -9 682.00 -49.6 -47.7 -49.5 63 -99 SPO 1997 10 09 04 46 52 6.8 -9 682.00 -49.4 -47.6 -49.3 63 -99 SPO 1997 10 09 04 47 53 6.8 -9 681.90 -49.4 -47.7 -49.3 65 -99 SPO 1997 10 09 04 48 51 6.9 -9 682.00 -49.2 -47.7 -49.2 65 -99 SPO 1997 10 09 04 49 50 6.7 -9 682.00 -49.2 -47.7 -49.1 67 -99 SPO 1997 10 09 04 50 49 6.9 -9 682.00 -49.2 -47.6 -49.1 68 -99 SPO 1997 10 09 04 51 47 7.0 -9 682.00 -49.0 -47.6 -49.0 67 -99 SPO 1997 10 09 04 52 46 7.2 -9 682.00 -48.8 -47.6 -48.8 67 -99 SPO 1997 10 09 04 53 46 7.3 -9 682.00 -48.8 -47.6 -48.8 68 -99 SPO 1997 10 09 04 54 45 7.5 -9 681.90 -48.8 -47.4 -48.8 69 -99 SPO 1997 10 09 04 55 46 7.6 -9 681.90 -48.7 -47.4 -48.8 69 -99 SPO 1997 10 09 04 56 45 7.5 -9 681.90 -48.7 -47.4 -48.7 70 -99 SPO 1997 10 09 04 57 44 7.8 -9 681.90 -48.7 -47.3 -48.7 72 -99 SPO 1997 10 09 04 58 44 7.7 -9 682.00 -48.6 -47.3 -48.6 71 -99 SPO 1997 10 09 04 59 44 7.5 -9 682.00 -48.6 -47.3 -48.6 72 -99 SPO 1997 10 09 05 00 43 7.5 -9 682.00 -48.6 -47.2 -48.6 72 0 SPO 1997 10 09 05 01 42 7.6 -9 682.00 -48.5 -47.2 -48.5 71 -99 SPO 1997 10 09 05 02 41 7.4 -9 682.10 -48.4 -47.2 -48.4 70 -99 SPO 1997 10 09 05 03 41 7.1 -9 682.10 -48.4 -47.3 -48.4 70 -99 SPO 1997 10 09 05 04 41 7.2 -9 682.10 -48.4 -47.3 -48.4 70 -99 SPO 1997 10 09 05 05 40 7.3 -9 682.10 -48.4 -47.3 -48.4 70 -99 SPO 1997 10 09 05 06 40 7.2 -9 682.10 -48.4 -47.4 -48.4 70 -99 SPO 1997 10 09 05 07 42 7.6 -9 682.10 -48.4 -47.3 -48.4 71 -99 SPO 1997 10 09 05 08 41 7.8 -9 682.00 -48.4 -47.3 -48.3 71 -99 SPO 1997 10 09 05 09 41 7.9 -9 682.00 -48.4 -47.3 -48.4 72 -99 SPO 1997 10 09 05 10 41 7.9 -9 682.00 -48.4 -47.2 -48.4 73 -99 SPO 1997 10 09 05 11 40 8.0 -9 682.10 -48.4 -47.2 -48.4 73 -99 SPO 1997 10 09 05 12 41 8.1 -9 682.10 -48.4 -47.2 -48.3 73 -99 SPO 1997 10 09 05 13 41 7.9 -9 682.10 -48.4 -47.2 -48.4 73 -99 SPO 1997 10 09 05 14 42 8.2 -9 682.10 -48.4 -47.2 -48.4 73 -99 SPO 1997 10 09 05 15 42 8.3 -9 682.10 -48.4 -47.2 -48.4 73 -99 SPO 1997 10 09 05 16 42 8.2 -9 682.10 -48.4 -47.2 -48.3 73 -99 SPO 1997 10 09 05 17 41 8.5 -9 682.10 -48.3 -47.2 -48.3 72 -99 SPO 1997 10 09 05 18 42 8.7 -9 682.00 -48.3 -47.1 -48.3 72 -99 SPO 1997 10 09 05 19 41 8.8 -9 682.00 -48.2 -47.1 -48.2 70 -99 SPO 1997 10 09 05 20 40 8.9 -9 682.00 -48.2 -47.1 -48.2 71 -99 SPO 1997 10 09 05 21 39 9.0 -9 682.00 -48.3 -47.1 -48.2 72 -99 SPO 1997 10 09 05 22 39 9.2 -9 682.00 -48.2 -47.1 -48.2 73 -99 SPO 1997 10 09 05 23 37 9.2 -9 682.00 -48.2 -47.1 -48.2 73 -99 SPO 1997 10 09 05 24 38 9.4 -9 682.00 -48.1 -47.0 -48.1 72 -99 SPO 1997 10 09 05 25 37 9.3 -9 682.00 -48.1 -47.0 -48.1 71 -99 SPO 1997 10 09 05 26 36 9.4 -9 681.90 -48.0 -47.0 -48.1 70 -99 SPO 1997 10 09 05 27 36 9.6 -9 681.90 -48.1 -47.0 -48.1 71 -99 SPO 1997 10 09 05 28 35 9.6 -9 681.90 -48.0 -46.9 -48.0 70 -99 SPO 1997 10 09 05 29 34 9.7 -9 681.90 -48.0 -46.9 -48.0 70 -99 SPO 1997 10 09 05 30 34 9.9 -9 681.90 -47.9 -46.9 -47.9 70 -99 SPO 1997 10 09 05 31 34 9.6 -9 681.90 -47.9 -46.8 -48.0 70 -99 SPO 1997 10 09 05 32 34 10.1 -9 681.90 -47.9 -46.8 -48.0 71 -99 SPO 1997 10 09 05 33 33 9.8 -9 681.90 -47.8 -46.8 -47.9 71 -99 SPO 1997 10 09 05 34 32 9.8 -9 681.90 -47.8 -46.7 -47.8 71 -99 SPO 1997 10 09 05 35 31 9.9 -9 681.90 -47.8 -46.7 -47.8 71 -99 SPO 1997 10 09 05 36 31 10.1 -9 681.90 -47.7 -46.6 -47.7 71 -99 SPO 1997 10 09 05 37 29 10.1 -9 681.90 -47.6 -46.6 -47.7 70 -99 SPO 1997 10 09 05 38 28 9.9 -9 681.90 -47.6 -46.6 -47.6 71 -99 SPO 1997 10 09 05 39 27 9.8 -9 682.00 -47.6 -46.7 -47.6 71 -99 SPO 1997 10 09 05 40 27 9.7 -9 682.00 -47.7 -46.7 -47.7 72 -99 SPO 1997 10 09 05 41 26 9.8 -9 682.00 -47.6 -46.7 -47.7 71 -99 SPO 1997 10 09 05 42 25 9.9 -9 682.00 -47.7 -46.6 -47.7 72 -99 SPO 1997 10 09 05 43 24 10.3 -9 682.00 -47.6 -46.5 -47.6 71 -99 SPO 1997 10 09 05 44 24 10.5 -9 682.00 -47.6 -46.5 -47.6 71 -99 SPO 1997 10 09 05 45 24 10.0 -9 682.00 -47.6 -46.5 -47.6 71 -99 SPO 1997 10 09 05 46 24 10.3 -9 681.90 -47.5 -46.5 -47.6 71 -99 SPO 1997 10 09 05 47 25 10.3 -9 681.90 -47.6 -46.4 -47.6 72 -99 SPO 1997 10 09 05 48 24 10.2 -9 681.90 -47.6 -46.4 -47.6 72 -99 SPO 1997 10 09 05 49 24 10.7 -9 681.90 -47.5 -46.3 -47.5 71 -99 SPO 1997 10 09 05 50 24 10.5 -9 681.90 -47.4 -46.3 -47.4 71 -99 SPO 1997 10 09 05 51 23 10.6 -9 681.90 -47.4 -46.3 -47.4 71 -99 SPO 1997 10 09 05 52 23 10.3 -9 681.90 -47.4 -46.2 -47.4 71 -99 SPO 1997 10 09 05 53 22 10.3 -9 681.90 -47.4 -46.3 -47.4 70 -99 SPO 1997 10 09 05 54 22 10.2 -9 681.90 -47.4 -46.3 -47.4 71 -99 SPO 1997 10 09 05 55 22 10.2 -9 681.90 -47.3 -46.3 -47.4 70 -99 SPO 1997 10 09 05 56 21 9.9 -9 681.90 -47.4 -46.2 -47.4 71 -99 SPO 1997 10 09 05 57 21 10.2 -9 681.90 -47.4 -46.2 -47.3 71 -99 SPO 1997 10 09 05 58 21 9.7 -9 681.90 -47.3 -46.2 -47.3 71 -99 SPO 1997 10 09 05 59 22 10.0 -9 681.90 -47.3 -46.3 -47.4 71 -99 SPO 1997 10 09 06 00 21 10.1 -9 682.00 -47.2 -46.2 -47.2 71 0 SPO 1997 10 09 06 01 22 9.8 -9 682.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 06 02 22 9.6 -9 682.00 -47.2 -46.2 -47.3 71 -99 SPO 1997 10 09 06 03 22 9.4 -9 682.00 -47.2 -46.2 -47.2 72 -99 SPO 1997 10 09 06 04 23 9.6 -9 682.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 06 05 22 9.6 -9 682.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 06 06 23 9.5 -9 682.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 06 07 23 9.9 -9 682.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 06 08 24 10.1 -9 682.00 -47.1 -46.1 -47.2 70 -99 SPO 1997 10 09 06 09 24 10.0 -9 682.00 -47.1 -46.1 -47.1 70 -99 SPO 1997 10 09 06 10 24 10.1 -9 682.00 -47.1 -46.1 -47.1 71 -99 SPO 1997 10 09 06 11 24 10.2 -9 682.00 -47.1 -46.1 -47.1 71 -99 SPO 1997 10 09 06 12 24 10.1 -9 682.00 -47.1 -46.2 -47.2 71 -99 SPO 1997 10 09 06 13 24 10.1 -9 682.00 -47.1 -46.1 -47.1 73 -99 SPO 1997 10 09 06 14 24 10.1 -9 682.00 -47.1 -46.1 -47.1 73 -99 SPO 1997 10 09 06 15 24 9.8 -9 682.00 -47.1 -46.1 -47.1 73 -99 SPO 1997 10 09 06 16 23 9.6 -9 682.00 -47.1 -46.1 -47.1 73 -99 SPO 1997 10 09 06 17 23 9.8 -9 682.00 -47.1 -46.0 -47.1 73 -99 SPO 1997 10 09 06 18 24 10.0 -9 682.00 -47.1 -46.0 -47.0 73 -99 SPO 1997 10 09 06 19 24 9.6 -9 682.00 -47.0 -46.0 -47.0 71 -99 SPO 1997 10 09 06 20 23 9.7 -9 682.00 -47.0 -46.0 -47.0 71 -99 SPO 1997 10 09 06 21 23 9.7 -9 682.10 -47.0 -46.0 -47.0 72 -99 SPO 1997 10 09 06 22 23 9.4 -9 682.10 -47.0 -46.0 -47.0 72 -99 SPO 1997 10 09 06 23 24 9.4 -9 682.10 -47.0 -46.0 -47.0 72 -99 SPO 1997 10 09 06 24 25 9.3 -9 682.10 -47.0 -46.0 -47.0 73 -99 SPO 1997 10 09 06 25 25 9.4 -9 682.10 -47.0 -46.0 -46.9 72 -99 SPO 1997 10 09 06 26 25 9.3 -9 682.10 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 06 27 25 9.2 -9 682.10 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 06 28 25 9.0 -9 682.10 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 06 29 25 8.8 -9 682.10 -47.1 -46.1 -47.0 73 -99 SPO 1997 10 09 06 30 25 8.8 -9 682.20 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 06 31 26 9.0 -9 682.20 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 06 32 26 8.6 -9 682.20 -47.0 -46.1 -47.0 71 -99 SPO 1997 10 09 06 33 27 8.7 -9 682.20 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 06 34 28 8.6 -9 682.20 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 06 35 28 8.3 -9 682.30 -47.0 -46.1 -46.9 73 -99 SPO 1997 10 09 06 36 29 8.6 -9 682.30 -47.0 -46.0 -47.0 73 -99 SPO 1997 10 09 06 37 29 8.6 -9 682.30 -47.0 -46.0 -46.9 74 -99 SPO 1997 10 09 06 38 29 8.6 -9 682.30 -46.9 -46.0 -46.9 73 -99 SPO 1997 10 09 06 39 30 8.5 -9 682.40 -46.9 -46.0 -46.9 73 -99 SPO 1997 10 09 06 40 29 8.6 -9 682.40 -46.9 -46.0 -46.8 73 -99 SPO 1997 10 09 06 41 29 8.2 -9 682.40 -46.8 -46.0 -46.9 72 -99 SPO 1997 10 09 06 42 30 8.0 -9 682.50 -46.8 -46.0 -46.8 71 -99 SPO 1997 10 09 06 43 29 7.7 -9 682.50 -46.9 -46.1 -46.8 72 -99 SPO 1997 10 09 06 44 28 7.4 -9 682.50 -46.8 -46.1 -46.8 72 -99 SPO 1997 10 09 06 45 28 7.7 -9 682.50 -46.9 -46.2 -46.9 72 -99 SPO 1997 10 09 06 46 29 7.9 -9 682.50 -46.9 -46.2 -46.9 73 -99 SPO 1997 10 09 06 47 29 7.7 -9 682.50 -46.9 -46.2 -46.9 74 -99 SPO 1997 10 09 06 48 28 7.6 -9 682.50 -47.0 -46.2 -46.9 75 -99 SPO 1997 10 09 06 49 28 7.8 -9 682.50 -47.0 -46.2 -46.9 75 -99 SPO 1997 10 09 06 50 28 7.5 -9 682.50 -47.0 -46.2 -46.9 75 -99 SPO 1997 10 09 06 51 28 7.4 -9 682.40 -47.0 -46.2 -46.9 75 -99 SPO 1997 10 09 06 52 27 7.3 -9 682.40 -47.0 -46.2 -46.9 74 -99 SPO 1997 10 09 06 53 27 7.4 -9 682.40 -47.0 -46.2 -46.9 73 -99 SPO 1997 10 09 06 54 27 7.6 -9 682.40 -47.0 -46.2 -46.9 72 -99 SPO 1997 10 09 06 55 27 7.8 -9 682.40 -47.0 -46.1 -46.9 72 -99 SPO 1997 10 09 06 56 26 7.8 -9 682.40 -46.9 -46.1 -46.8 72 -99 SPO 1997 10 09 06 57 27 8.2 -9 682.40 -46.9 -46.0 -46.8 72 -99 SPO 1997 10 09 06 58 27 8.1 -9 682.40 -46.9 -46.0 -46.8 72 -99 SPO 1997 10 09 06 59 27 8.7 -9 682.40 -46.9 -46.0 -46.8 72 -99 SPO 1997 10 09 07 00 28 8.4 -9 682.40 -46.8 -45.9 -46.7 72 0 SPO 1997 10 09 07 01 27 8.6 -9 682.40 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 02 29 8.6 -9 682.30 -46.8 -46.0 -46.7 74 -99 SPO 1997 10 09 07 03 28 8.6 -9 682.30 -46.8 -46.0 -46.8 74 -99 SPO 1997 10 09 07 04 29 8.8 -9 682.30 -46.8 -46.0 -46.8 74 -99 SPO 1997 10 09 07 05 29 9.0 -9 682.30 -46.8 -45.9 -46.8 73 -99 SPO 1997 10 09 07 06 30 8.8 -9 682.40 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 07 30 8.9 -9 682.40 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 08 29 9.3 -9 682.30 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 09 29 9.3 -9 682.30 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 07 10 28 9.4 -9 682.30 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 11 28 9.4 -9 682.40 -46.7 -45.8 -46.7 73 -99 SPO 1997 10 09 07 12 28 8.7 -9 682.40 -46.7 -45.9 -46.7 73 -99 SPO 1997 10 09 07 13 28 9.1 -9 682.40 -46.8 -45.8 -46.7 74 -99 SPO 1997 10 09 07 14 28 9.1 -9 682.40 -46.7 -45.8 -46.7 73 -99 SPO 1997 10 09 07 15 28 8.7 -9 682.30 -46.8 -45.8 -46.7 74 -99 SPO 1997 10 09 07 16 27 8.6 -9 682.40 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 07 17 28 8.6 -9 682.40 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 07 18 28 8.2 -9 682.40 -46.8 -45.9 -46.7 73 -99 SPO 1997 10 09 07 19 28 8.2 -9 682.40 -46.8 -46.0 -46.7 73 -99 SPO 1997 10 09 07 20 30 8.0 -9 682.40 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 07 21 28 8.1 -9 682.50 -46.8 -46.0 -46.7 72 -99 SPO 1997 10 09 07 22 29 8.2 -9 682.40 -46.8 -46.0 -46.7 72 -99 SPO 1997 10 09 07 23 28 8.7 -9 682.40 -46.8 -45.9 -46.7 73 -99 SPO 1997 10 09 07 24 28 8.5 -9 682.40 -46.8 -45.9 -46.7 73 -99 SPO 1997 10 09 07 25 28 8.9 -9 682.40 -46.7 -45.8 -46.6 72 -99 SPO 1997 10 09 07 26 28 9.4 -9 682.40 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 07 27 28 9.0 -9 682.40 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 07 28 28 9.0 -9 682.40 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 07 29 28 8.6 -9 682.40 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 07 30 27 8.7 -9 682.40 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 07 31 27 8.9 -9 682.40 -46.7 -45.8 -46.6 73 -99 SPO 1997 10 09 07 32 27 8.9 -9 682.40 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 07 33 27 9.0 -9 682.30 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 07 34 28 9.2 -9 682.30 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 07 35 28 9.1 -9 682.40 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 07 36 28 9.2 -9 682.40 -46.7 -45.8 -46.7 74 -99 SPO 1997 10 09 07 37 29 9.1 -9 682.40 -46.7 -45.9 -46.7 74 -99 SPO 1997 10 09 07 38 30 9.3 -9 682.40 -46.7 -45.9 -46.7 74 -99 SPO 1997 10 09 07 39 30 9.1 -9 682.40 -46.7 -46.0 -46.7 74 -99 SPO 1997 10 09 07 40 30 9.0 -9 682.40 -46.7 -46.0 -46.7 74 -99 SPO 1997 10 09 07 41 29 9.1 -9 682.40 -46.8 -46.0 -46.8 76 -99 SPO 1997 10 09 07 42 30 9.2 -9 682.40 -46.8 -46.0 -46.8 75 -99 SPO 1997 10 09 07 43 30 9.1 -9 682.40 -46.8 -46.0 -46.8 74 -99 SPO 1997 10 09 07 44 31 9.1 -9 682.40 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 07 45 31 9.0 -9 682.40 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 07 46 31 8.9 -9 682.40 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 07 47 32 8.9 -9 682.40 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 07 48 32 8.6 -9 682.40 -46.9 -46.0 -46.9 74 -99 SPO 1997 10 09 07 49 34 8.9 -9 682.40 -47.0 -46.1 -46.9 74 -99 SPO 1997 10 09 07 50 34 8.9 -9 682.50 -46.9 -46.1 -46.9 73 -99 SPO 1997 10 09 07 51 33 8.7 -9 682.50 -46.9 -46.2 -46.8 72 -99 SPO 1997 10 09 07 52 33 8.4 -9 682.50 -47.0 -46.2 -46.9 73 -99 SPO 1997 10 09 07 53 34 8.6 -9 682.50 -47.0 -46.2 -46.9 74 -99 SPO 1997 10 09 07 54 34 8.3 -9 682.50 -47.0 -46.2 -46.9 74 -99 SPO 1997 10 09 07 55 33 8.2 -9 682.50 -47.0 -46.3 -47.0 73 -99 SPO 1997 10 09 07 56 34 7.7 -9 682.50 -47.1 -46.3 -47.1 73 -99 SPO 1997 10 09 07 57 34 7.7 -9 682.50 -47.2 -46.4 -47.1 72 -99 SPO 1997 10 09 07 58 34 7.7 -9 682.50 -47.2 -46.4 -47.1 71 -99 SPO 1997 10 09 07 59 34 8.0 -9 682.50 -47.1 -46.3 -47.1 71 -99 SPO 1997 10 09 08 00 35 7.9 -9 682.50 -47.1 -46.3 -47.1 71 0 SPO 1997 10 09 08 01 35 7.6 -9 682.60 -47.1 -46.4 -47.1 71 -99 SPO 1997 10 09 08 02 36 7.5 -9 682.60 -47.2 -46.4 -47.1 72 -99 SPO 1997 10 09 08 03 35 7.5 -9 682.60 -47.2 -46.4 -47.1 74 -99 SPO 1997 10 09 08 04 36 7.2 -9 682.60 -47.2 -46.4 -47.1 72 -99 SPO 1997 10 09 08 05 36 6.5 -9 682.60 -47.2 -46.5 -47.2 74 -99 SPO 1997 10 09 08 06 36 7.0 -9 682.60 -47.3 -46.5 -47.2 73 -99 SPO 1997 10 09 08 07 36 6.9 -9 682.60 -47.2 -46.5 -47.1 71 -99 SPO 1997 10 09 08 08 37 6.4 -9 682.60 -47.2 -46.6 -47.2 71 -99 SPO 1997 10 09 08 09 37 6.2 -9 682.60 -47.3 -46.7 -47.2 73 -99 SPO 1997 10 09 08 10 38 6.1 -9 682.60 -47.4 -46.7 -47.2 73 -99 SPO 1997 10 09 08 11 40 6.4 -9 682.60 -47.4 -46.7 -47.3 73 -99 SPO 1997 10 09 08 12 41 6.2 -9 682.60 -47.3 -46.7 -47.2 72 -99 SPO 1997 10 09 08 13 41 6.3 -9 682.60 -47.4 -46.7 -47.3 72 -99 SPO 1997 10 09 08 14 44 5.9 -9 682.60 -47.5 -46.6 -47.3 74 -99 SPO 1997 10 09 08 15 44 6.3 -9 682.70 -47.4 -46.7 -47.3 73 -99 SPO 1997 10 09 08 16 45 6.1 -9 682.70 -47.4 -46.7 -47.3 73 -99 SPO 1997 10 09 08 17 45 5.9 -9 682.70 -47.4 -46.7 -47.4 73 -99 SPO 1997 10 09 08 18 45 6.4 -9 682.70 -47.5 -46.7 -47.4 75 -99 SPO 1997 10 09 08 19 42 6.6 -9 682.70 -47.4 -46.6 -47.2 73 -99 SPO 1997 10 09 08 20 44 6.5 -9 682.70 -47.4 -46.6 -47.2 73 -99 SPO 1997 10 09 08 21 43 6.5 -9 682.70 -47.3 -46.5 -47.2 72 -99 SPO 1997 10 09 08 22 44 6.5 -9 682.70 -47.4 -46.5 -47.2 73 -99 SPO 1997 10 09 08 23 45 6.3 -9 682.70 -47.3 -46.6 -47.2 72 -99 SPO 1997 10 09 08 24 46 6.2 -9 682.70 -47.3 -46.6 -47.2 72 -99 SPO 1997 10 09 08 25 47 5.8 -9 682.70 -47.4 -46.6 -47.2 74 -99 SPO 1997 10 09 08 26 46 6.0 -9 682.70 -47.5 -46.8 -47.3 75 -99 SPO 1997 10 09 08 27 47 5.9 -9 682.70 -47.5 -46.7 -47.4 75 -99 SPO 1997 10 09 08 28 47 5.7 -9 682.80 -47.6 -46.8 -47.4 76 -99 SPO 1997 10 09 08 29 50 5.7 -9 682.80 -47.6 -46.8 -47.4 75 -99 SPO 1997 10 09 08 30 51 5.6 -9 682.80 -47.6 -46.8 -47.5 75 -99 SPO 1997 10 09 08 31 49 5.8 -9 682.80 -47.7 -46.8 -47.5 75 -99 SPO 1997 10 09 08 32 49 5.9 -9 682.80 -47.7 -46.9 -47.5 74 -99 SPO 1997 10 09 08 33 47 5.9 -9 682.80 -47.7 -46.9 -47.5 73 -99 SPO 1997 10 09 08 34 48 5.9 -9 682.80 -47.7 -46.8 -47.6 72 -99 SPO 1997 10 09 08 35 48 5.7 -9 682.80 -47.7 -46.9 -47.6 72 -99 SPO 1997 10 09 08 36 49 6.0 -9 682.80 -47.8 -46.9 -47.7 73 -99 SPO 1997 10 09 08 37 49 5.8 -9 682.80 -47.8 -46.9 -47.7 74 -99 SPO 1997 10 09 08 38 50 5.9 -9 682.80 -47.9 -47.0 -47.7 75 -99 SPO 1997 10 09 08 39 51 5.5 -9 682.80 -48.0 -47.0 -47.8 75 -99 SPO 1997 10 09 08 40 49 5.7 -9 682.80 -47.9 -47.0 -47.8 75 -99 SPO 1997 10 09 08 41 50 5.8 -9 682.80 -48.0 -47.0 -47.8 75 -99 SPO 1997 10 09 08 42 49 5.8 -9 682.80 -48.0 -47.0 -47.8 74 -99 SPO 1997 10 09 08 43 49 5.9 -9 682.80 -48.0 -47.0 -47.8 74 -99 SPO 1997 10 09 08 44 49 5.3 -9 682.80 -47.9 -47.0 -47.8 73 -99 SPO 1997 10 09 08 45 49 5.3 -9 682.80 -48.0 -47.1 -47.8 73 -99 SPO 1997 10 09 08 46 50 5.4 -9 682.90 -48.0 -47.2 -47.9 73 -99 SPO 1997 10 09 08 47 49 5.4 -9 682.80 -48.1 -47.2 -47.9 73 -99 SPO 1997 10 09 08 48 52 5.1 -9 682.80 -48.1 -47.2 -47.9 73 -99 SPO 1997 10 09 08 49 50 5.4 -9 682.80 -48.2 -47.2 -48.0 74 -99 SPO 1997 10 09 08 50 51 5.2 -9 682.80 -48.1 -47.1 -48.0 73 -99 SPO 1997 10 09 08 51 52 5.3 -9 682.80 -48.1 -47.2 -48.0 72 -99 SPO 1997 10 09 08 52 53 5.1 -9 682.80 -48.1 -47.2 -48.0 72 -99 SPO 1997 10 09 08 53 54 5.1 -9 682.80 -48.1 -47.2 -48.0 72 -99 SPO 1997 10 09 08 54 55 5.1 -9 682.80 -48.2 -47.2 -48.0 73 -99 SPO 1997 10 09 08 55 55 5.1 -9 682.80 -48.2 -47.2 -48.0 73 -99 SPO 1997 10 09 08 56 54 5.2 -9 682.80 -48.2 -47.2 -48.0 73 -99 SPO 1997 10 09 08 57 54 5.2 -9 682.80 -48.2 -47.2 -48.0 72 -99 SPO 1997 10 09 08 58 54 5.2 -9 682.80 -48.3 -47.2 -48.1 72 -99 SPO 1997 10 09 08 59 54 5.2 -9 682.80 -48.2 -47.2 -48.0 70 -99 SPO 1997 10 09 09 00 54 4.7 -9 682.90 -48.2 -47.3 -48.0 70 0 SPO 1997 10 09 09 01 52 5.0 -9 682.90 -48.3 -47.3 -48.1 72 -99 SPO 1997 10 09 09 02 53 4.6 -9 682.90 -48.3 -47.3 -48.1 72 -99 SPO 1997 10 09 09 03 53 4.9 -9 682.90 -48.4 -47.4 -48.1 74 -99 SPO 1997 10 09 09 04 50 4.7 -9 682.90 -48.3 -47.4 -48.1 73 -99 SPO 1997 10 09 09 05 50 5.2 -9 682.90 -48.3 -47.4 -48.1 72 -99 SPO 1997 10 09 09 06 49 5.6 -9 682.80 -48.3 -47.2 -48.1 73 -99 SPO 1997 10 09 09 07 48 6.2 -9 682.80 -48.3 -47.2 -48.1 73 -99 SPO 1997 10 09 09 08 48 6.4 -9 682.80 -48.1 -47.1 -47.9 71 -99 SPO 1997 10 09 09 09 49 6.5 -9 682.80 -48.1 -47.0 -48.0 72 -99 SPO 1997 10 09 09 10 48 6.5 -9 682.80 -48.1 -47.0 -48.0 72 -99 SPO 1997 10 09 09 11 47 6.8 -9 682.80 -48.2 -46.9 -48.0 73 -99 SPO 1997 10 09 09 12 47 6.6 -9 682.90 -48.2 -46.9 -48.0 72 -99 SPO 1997 10 09 09 13 46 6.8 -9 682.90 -48.1 -46.8 -48.0 72 -99 SPO 1997 10 09 09 14 46 6.7 -9 682.90 -48.1 -46.8 -48.0 73 -99 SPO 1997 10 09 09 15 45 6.7 -9 682.90 -48.1 -46.8 -48.0 73 -99 SPO 1997 10 09 09 16 43 6.7 -9 682.90 -48.1 -46.8 -48.0 72 -99 SPO 1997 10 09 09 17 43 6.7 -9 682.90 -48.1 -46.8 -48.0 72 -99 SPO 1997 10 09 09 18 42 6.7 -9 682.90 -48.1 -46.9 -47.9 73 -99 SPO 1997 10 09 09 19 43 6.9 -9 682.90 -48.0 -46.9 -47.9 72 -99 SPO 1997 10 09 09 20 43 6.6 -9 682.90 -48.0 -46.9 -47.9 73 -99 SPO 1997 10 09 09 21 43 6.6 -9 682.90 -48.0 -46.9 -47.9 73 -99 SPO 1997 10 09 09 22 42 6.8 -9 682.90 -48.0 -47.0 -47.9 72 -99 SPO 1997 10 09 09 23 41 6.9 -9 682.90 -48.1 -46.9 -48.0 73 -99 SPO 1997 10 09 09 24 40 7.2 -9 682.90 -48.1 -46.9 -48.0 72 -99 SPO 1997 10 09 09 25 40 7.3 -9 682.90 -48.0 -46.8 -47.8 71 -99 SPO 1997 10 09 09 26 39 7.0 -9 682.90 -47.9 -46.8 -47.8 71 -99 SPO 1997 10 09 09 27 38 6.8 -9 682.90 -48.0 -46.9 -47.9 73 -99 SPO 1997 10 09 09 28 37 7.0 -9 682.90 -48.0 -46.8 -47.9 73 -99 SPO 1997 10 09 09 29 37 7.6 -9 682.80 -47.9 -46.8 -47.8 72 -99 SPO 1997 10 09 09 30 37 7.6 -9 682.80 -47.8 -46.8 -47.7 72 -99 SPO 1997 10 09 09 31 37 8.1 -9 682.80 -47.9 -46.7 -47.8 74 -99 SPO 1997 10 09 09 32 37 8.0 -9 682.80 -47.8 -46.7 -47.7 73 -99 SPO 1997 10 09 09 33 36 8.1 -9 682.80 -47.8 -46.7 -47.7 74 -99 SPO 1997 10 09 09 34 36 8.2 -9 682.80 -47.8 -46.7 -47.7 74 -99 SPO 1997 10 09 09 35 35 7.9 -9 682.80 -47.7 -46.7 -47.6 73 -99 SPO 1997 10 09 09 36 36 7.9 -9 682.80 -47.8 -46.7 -47.7 73 -99 SPO 1997 10 09 09 37 36 7.9 -9 682.80 -47.8 -46.8 -47.7 73 -99 SPO 1997 10 09 09 38 36 7.8 -9 682.90 -47.6 -46.7 -47.6 72 -99 SPO 1997 10 09 09 39 36 7.8 -9 682.90 -47.7 -46.8 -47.6 73 -99 SPO 1997 10 09 09 40 36 8.1 -9 682.90 -47.7 -46.7 -47.6 74 -99 SPO 1997 10 09 09 41 36 8.0 -9 682.80 -47.6 -46.7 -47.5 73 -99 SPO 1997 10 09 09 42 36 8.2 -9 682.80 -47.6 -46.7 -47.5 73 -99 SPO 1997 10 09 09 43 36 8.1 -9 682.80 -47.6 -46.7 -47.5 73 -99 SPO 1997 10 09 09 44 36 8.4 -9 682.90 -47.6 -46.6 -47.5 74 -99 SPO 1997 10 09 09 45 35 8.4 -9 682.80 -47.5 -46.6 -47.5 72 -99 SPO 1997 10 09 09 46 36 8.6 -9 682.80 -47.5 -46.6 -47.4 72 -99 SPO 1997 10 09 09 47 35 9.1 -9 682.80 -47.5 -46.5 -47.4 72 -99 SPO 1997 10 09 09 48 35 8.9 -9 682.80 -47.4 -46.5 -47.4 71 -99 SPO 1997 10 09 09 49 35 8.9 -9 682.80 -47.4 -46.5 -47.4 71 -99 SPO 1997 10 09 09 50 35 9.1 -9 682.80 -47.5 -46.5 -47.4 72 -99 SPO 1997 10 09 09 51 34 8.9 -9 682.80 -47.4 -46.5 -47.3 71 -99 SPO 1997 10 09 09 52 35 9.0 -9 682.80 -47.3 -46.5 -47.3 71 -99 SPO 1997 10 09 09 53 35 8.6 -9 682.80 -47.3 -46.5 -47.3 71 -99 SPO 1997 10 09 09 54 34 8.8 -9 682.80 -47.3 -46.5 -47.2 72 -99 SPO 1997 10 09 09 55 33 8.9 -9 682.80 -47.4 -46.4 -47.3 73 -99 SPO 1997 10 09 09 56 33 9.4 -9 682.80 -47.3 -46.4 -47.2 72 -99 SPO 1997 10 09 09 57 32 9.2 -9 682.80 -47.2 -46.3 -47.2 72 -99 SPO 1997 10 09 09 58 32 9.4 -9 682.80 -47.2 -46.3 -47.2 72 -99 SPO 1997 10 09 09 59 32 9.3 -9 682.80 -47.2 -46.4 -47.1 71 -99 SPO 1997 10 09 10 00 31 9.8 -9 682.80 -47.1 -46.3 -47.1 71 0 SPO 1997 10 09 10 01 30 10.0 -9 682.80 -47.0 -46.2 -47.0 70 -99 SPO 1997 10 09 10 02 30 10.1 -9 682.70 -47.0 -46.2 -47.0 70 -99 SPO 1997 10 09 10 03 30 10.2 -9 682.70 -47.0 -46.1 -47.0 71 -99 SPO 1997 10 09 10 04 30 10.7 -9 682.60 -47.0 -46.0 -47.0 71 -99 SPO 1997 10 09 10 05 29 11.0 -9 682.60 -47.0 -45.9 -47.0 72 -99 SPO 1997 10 09 10 06 29 10.8 -9 682.60 -47.0 -46.0 -46.9 72 -99 SPO 1997 10 09 10 07 29 10.8 -9 682.60 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 10 08 29 11.0 -9 682.60 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 10 09 29 10.5 -9 682.70 -46.9 -46.0 -47.0 73 -99 SPO 1997 10 09 10 10 29 10.9 -9 682.70 -47.0 -46.0 -47.0 74 -99 SPO 1997 10 09 10 11 30 10.7 -9 682.60 -46.9 -46.1 -47.0 72 -99 SPO 1997 10 09 10 12 30 10.6 -9 682.70 -46.9 -46.1 -47.0 72 -99 SPO 1997 10 09 10 13 30 10.5 -9 682.70 -46.9 -46.1 -46.9 72 -99 SPO 1997 10 09 10 14 29 10.7 -9 682.70 -46.9 -46.1 -47.0 72 -99 SPO 1997 10 09 10 15 29 10.6 -9 682.70 -46.9 -46.1 -46.9 72 -99 SPO 1997 10 09 10 16 29 10.6 -9 682.70 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 10 17 29 10.3 -9 682.70 -47.0 -46.0 -47.0 74 -99 SPO 1997 10 09 10 18 28 10.5 -9 682.70 -46.9 -46.0 -46.9 73 -99 SPO 1997 10 09 10 19 28 10.3 -9 682.70 -46.9 -46.0 -46.9 73 -99 SPO 1997 10 09 10 20 29 10.4 -9 682.70 -46.9 -46.0 -46.9 74 -99 SPO 1997 10 09 10 21 30 10.2 -9 682.70 -46.9 -46.0 -46.9 74 -99 SPO 1997 10 09 10 22 30 10.2 -9 682.70 -46.8 -46.0 -46.9 72 -99 SPO 1997 10 09 10 23 30 10.1 -9 682.80 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 10 24 29 10.1 -9 682.80 -46.8 -46.0 -46.8 71 -99 SPO 1997 10 09 10 25 29 10.3 -9 682.80 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 10 26 30 10.5 -9 682.80 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 10 27 30 10.6 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 10 28 30 10.3 -9 682.80 -46.7 -46.0 -46.8 72 -99 SPO 1997 10 09 10 29 30 10.5 -9 682.70 -46.7 -45.9 -46.8 72 -99 SPO 1997 10 09 10 30 31 10.8 -9 682.70 -46.8 -45.9 -46.8 73 -99 SPO 1997 10 09 10 31 31 11.3 -9 682.70 -46.7 -45.9 -46.7 73 -99 SPO 1997 10 09 10 32 31 11.2 -9 682.70 -46.6 -45.9 -46.7 72 -99 SPO 1997 10 09 10 33 30 11.4 -9 682.70 -46.6 -45.8 -46.7 73 -99 SPO 1997 10 09 10 34 30 11.2 -9 682.60 -46.7 -45.8 -46.7 74 -99 SPO 1997 10 09 10 35 30 11.4 -9 682.60 -46.6 -45.8 -46.7 73 -99 SPO 1997 10 09 10 36 29 11.6 -9 682.60 -46.6 -45.7 -46.6 73 -99 SPO 1997 10 09 10 37 30 11.5 -9 682.60 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 10 38 29 11.5 -9 682.60 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 10 39 29 11.4 -9 682.60 -46.5 -45.7 -46.6 72 -99 SPO 1997 10 09 10 40 29 11.4 -9 682.60 -46.5 -45.6 -46.6 72 -99 SPO 1997 10 09 10 41 29 11.3 -9 682.60 -46.5 -45.7 -46.6 72 -99 SPO 1997 10 09 10 42 29 10.7 -9 682.60 -46.5 -45.8 -46.6 73 -99 SPO 1997 10 09 10 43 29 11.0 -9 682.70 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 10 44 30 10.7 -9 682.70 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 10 45 31 10.9 -9 682.70 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 10 46 32 10.7 -9 682.70 -46.5 -45.8 -46.6 73 -99 SPO 1997 10 09 10 47 32 10.3 -9 682.70 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 10 48 33 10.2 -9 682.70 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 10 49 34 10.7 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 10 50 34 10.3 -9 682.70 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 10 51 34 10.0 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 10 52 34 10.1 -9 682.80 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 10 53 35 10.0 -9 682.80 -46.7 -45.9 -46.6 74 -99 SPO 1997 10 09 10 54 35 9.8 -9 682.80 -46.7 -46.0 -46.6 74 -99 SPO 1997 10 09 10 55 36 10.1 -9 682.80 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 10 56 36 10.2 -9 682.70 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 10 57 36 10.0 -9 682.70 -46.7 -45.9 -46.7 74 -99 SPO 1997 10 09 10 58 36 10.2 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 10 59 35 10.3 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 00 35 10.1 -9 682.70 -46.7 -46.0 -46.7 72 0 SPO 1997 10 09 11 01 35 10.0 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 02 35 9.6 -9 682.80 -46.8 -46.0 -46.7 72 -99 SPO 1997 10 09 11 03 35 9.6 -9 682.80 -46.8 -46.0 -46.7 72 -99 SPO 1997 10 09 11 04 35 9.8 -9 682.70 -46.8 -46.0 -46.7 73 -99 SPO 1997 10 09 11 05 34 9.7 -9 682.80 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 06 34 9.5 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 07 35 9.8 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 08 34 9.7 -9 682.70 -46.8 -46.0 -46.7 74 -99 SPO 1997 10 09 11 09 34 9.9 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 10 34 10.0 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 11 34 9.7 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 12 35 10.3 -9 682.60 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 11 13 34 10.1 -9 682.60 -46.7 -45.9 -46.6 72 -99 SPO 1997 10 09 11 14 34 10.3 -9 682.60 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 11 15 35 10.2 -9 682.60 -46.6 -45.9 -46.6 71 -99 SPO 1997 10 09 11 16 35 10.5 -9 682.60 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 17 34 10.0 -9 682.70 -46.7 -45.9 -46.6 73 -99 SPO 1997 10 09 11 18 34 9.9 -9 682.70 -46.7 -46.0 -46.6 73 -99 SPO 1997 10 09 11 19 34 9.6 -9 682.70 -46.7 -46.0 -46.7 74 -99 SPO 1997 10 09 11 20 34 9.7 -9 682.70 -46.7 -46.0 -46.7 74 -99 SPO 1997 10 09 11 21 35 9.6 -9 682.70 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 22 35 10.0 -9 682.70 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 23 35 10.0 -9 682.70 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 24 36 10.0 -9 682.70 -46.8 -46.0 -46.7 73 -99 SPO 1997 10 09 11 25 36 10.0 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 26 36 9.9 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 27 37 10.1 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 28 36 10.0 -9 682.70 -46.7 -46.0 -46.7 72 -99 SPO 1997 10 09 11 29 36 9.8 -9 682.70 -46.7 -45.9 -46.7 73 -99 SPO 1997 10 09 11 30 36 10.1 -9 682.70 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 31 36 10.2 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 32 36 10.0 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 33 35 9.8 -9 682.70 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 11 34 33 10.4 -9 682.70 -46.6 -46.0 -46.6 72 -99 SPO 1997 10 09 11 35 34 10.1 -9 682.70 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 11 36 34 10.2 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 37 34 9.9 -9 682.70 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 38 34 10.2 -9 682.70 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 11 39 34 10.6 -9 682.60 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 40 34 10.5 -9 682.70 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 11 41 34 10.5 -9 682.60 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 11 42 34 10.2 -9 682.60 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 11 43 34 10.5 -9 682.60 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 11 44 33 10.4 -9 682.60 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 11 45 34 10.4 -9 682.60 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 11 46 33 10.5 -9 682.60 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 11 47 33 10.5 -9 682.60 -46.6 -45.8 -46.6 74 -99 SPO 1997 10 09 11 48 33 10.3 -9 682.60 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 11 49 32 10.3 -9 682.60 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 11 50 32 10.2 -9 682.60 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 11 51 31 10.5 -9 682.60 -46.6 -45.9 -46.6 72 -99 SPO 1997 10 09 11 52 30 10.3 -9 682.70 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 11 53 30 10.2 -9 682.70 -46.5 -45.8 -46.6 72 -99 SPO 1997 10 09 11 54 29 10.5 -9 682.70 -46.5 -45.8 -46.6 72 -99 SPO 1997 10 09 11 55 30 10.6 -9 682.70 -46.5 -45.9 -46.6 72 -99 SPO 1997 10 09 11 56 30 10.5 -9 682.70 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 11 57 30 11.2 -9 682.70 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 11 58 30 10.9 -9 682.70 -46.4 -45.7 -46.5 72 -99 SPO 1997 10 09 11 59 30 10.8 -9 682.70 -46.5 -45.8 -46.5 73 -99 SPO 1997 10 09 12 00 30 10.8 -9 682.70 -46.5 -45.8 -46.6 73 0 SPO 1997 10 09 12 01 30 11.2 -9 682.70 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 12 02 31 11.1 -9 682.70 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 12 03 30 11.2 -9 682.70 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 12 04 30 10.9 -9 682.70 -46.5 -45.8 -46.6 72 -99 SPO 1997 10 09 12 05 30 10.8 -9 682.70 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 12 06 30 10.8 -9 682.60 -46.6 -45.9 -46.7 72 -99 SPO 1997 10 09 12 07 30 11.0 -9 682.60 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 12 08 29 11.1 -9 682.60 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 12 09 29 11.3 -9 682.60 -46.6 -46.0 -46.6 73 -99 SPO 1997 10 09 12 10 30 11.4 -9 682.60 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 12 11 30 11.3 -9 682.60 -46.6 -45.9 -46.7 74 -99 SPO 1997 10 09 12 12 30 11.3 -9 682.60 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 09 12 13 30 11.4 -9 682.60 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 12 14 31 11.3 -9 682.60 -46.5 -45.9 -46.6 72 -99 SPO 1997 10 09 12 15 31 11.2 -9 682.60 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 12 16 31 11.2 -9 682.60 -46.6 -45.9 -46.6 73 -99 SPO 1997 10 09 12 17 31 11.0 -9 682.70 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 09 12 18 31 11.2 -9 682.70 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 09 12 19 32 11.2 -9 682.70 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 09 12 20 32 11.1 -9 682.70 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 09 12 21 32 11.2 -9 682.70 -46.6 -45.8 -46.7 74 -99 SPO 1997 10 09 12 22 32 10.9 -9 682.80 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 12 23 32 10.6 -9 682.80 -46.6 -45.9 -46.7 73 -99 SPO 1997 10 09 12 24 33 10.7 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 25 33 10.7 -9 682.80 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 26 34 10.2 -9 682.90 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 27 34 10.4 -9 682.90 -46.7 -46.1 -46.7 73 -99 SPO 1997 10 09 12 28 34 10.5 -9 682.90 -46.7 -46.1 -46.7 72 -99 SPO 1997 10 09 12 29 35 10.6 -9 682.90 -46.7 -46.1 -46.7 73 -99 SPO 1997 10 09 12 30 35 10.4 -9 682.90 -46.7 -46.1 -46.7 73 -99 SPO 1997 10 09 12 31 35 10.5 -9 682.90 -46.7 -46.1 -46.7 72 -99 SPO 1997 10 09 12 32 35 10.7 -9 682.90 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 33 35 10.7 -9 682.90 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 34 35 10.8 -9 682.90 -46.7 -46.0 -46.8 73 -99 SPO 1997 10 09 12 35 35 10.7 -9 682.90 -46.6 -46.0 -46.7 72 -99 SPO 1997 10 09 12 36 35 10.7 -9 682.90 -46.6 -45.9 -46.7 72 -99 SPO 1997 10 09 12 37 35 10.3 -9 682.90 -46.7 -45.9 -46.7 73 -99 SPO 1997 10 09 12 38 35 10.5 -9 682.90 -46.7 -46.0 -46.8 72 -99 SPO 1997 10 09 12 39 36 10.6 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 12 40 37 10.7 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 12 41 37 10.7 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 12 42 36 10.8 -9 682.90 -46.7 -46.0 -46.7 73 -99 SPO 1997 10 09 12 43 37 10.5 -9 682.90 -46.7 -46.0 -46.8 73 -99 SPO 1997 10 09 12 44 37 10.3 -9 683.00 -46.7 -46.0 -46.8 74 -99 SPO 1997 10 09 12 45 37 10.4 -9 683.00 -46.8 -46.0 -46.8 76 -99 SPO 1997 10 09 12 46 37 9.9 -9 683.00 -46.8 -46.0 -46.8 75 -99 SPO 1997 10 09 12 47 36 9.7 -9 683.00 -46.8 -46.0 -46.8 75 -99 SPO 1997 10 09 12 48 37 9.8 -9 683.00 -46.8 -46.0 -46.8 75 -99 SPO 1997 10 09 12 49 37 9.6 -9 683.00 -46.8 -46.0 -46.8 74 -99 SPO 1997 10 09 12 50 37 9.6 -9 683.00 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 12 51 36 9.4 -9 683.00 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 12 52 36 9.5 -9 683.00 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 12 53 36 9.8 -9 683.00 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 12 54 37 9.8 -9 683.00 -46.8 -46.0 -46.9 72 -99 SPO 1997 10 09 12 55 37 10.2 -9 683.00 -46.8 -45.9 -46.8 73 -99 SPO 1997 10 09 12 56 37 9.7 -9 683.00 -46.8 -46.0 -46.9 73 -99 SPO 1997 10 09 12 57 36 10.3 -9 683.00 -46.9 -46.0 -46.9 74 -99 SPO 1997 10 09 12 58 36 9.9 -9 683.00 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 12 59 36 10.1 -9 683.00 -46.8 -46.0 -46.9 73 -99 SPO 1997 10 09 13 00 36 10.2 -9 683.00 -46.9 -46.1 -46.9 74 0 SPO 1997 10 09 13 01 36 10.1 -9 683.00 -46.9 -46.1 -47.0 74 -99 SPO 1997 10 09 13 02 36 10.0 -9 683.00 -47.0 -46.1 -47.0 74 -99 SPO 1997 10 09 13 03 37 9.9 -9 683.00 -47.0 -46.1 -47.1 73 -99 SPO 1997 10 09 13 04 37 10.1 -9 683.00 -47.0 -46.1 -47.1 72 -99 SPO 1997 10 09 13 05 37 10.1 -9 683.00 -47.0 -46.1 -47.1 72 -99 SPO 1997 10 09 13 06 37 10.2 -9 683.00 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 13 07 37 10.1 -9 683.00 -47.0 -46.2 -47.1 72 -99 SPO 1997 10 09 13 08 37 9.9 -9 683.10 -47.0 -46.2 -47.2 72 -99 SPO 1997 10 09 13 09 37 10.2 -9 683.10 -47.0 -46.2 -47.1 72 -99 SPO 1997 10 09 13 10 37 9.7 -9 683.10 -47.1 -46.2 -47.2 73 -99 SPO 1997 10 09 13 11 37 9.8 -9 683.10 -47.1 -46.2 -47.2 73 -99 SPO 1997 10 09 13 12 36 9.7 -9 683.10 -47.1 -46.2 -47.2 73 -99 SPO 1997 10 09 13 13 35 9.6 -9 683.10 -47.1 -46.1 -47.2 71 -99 SPO 1997 10 09 13 14 35 9.4 -9 683.10 -47.1 -46.1 -47.2 71 -99 SPO 1997 10 09 13 15 35 9.6 -9 683.10 -47.1 -46.2 -47.2 71 -99 SPO 1997 10 09 13 16 35 9.7 -9 683.10 -47.1 -46.2 -47.1 70 -99 SPO 1997 10 09 13 17 34 9.9 -9 683.10 -47.1 -46.3 -47.1 70 -99 SPO 1997 10 09 13 18 34 9.8 -9 683.10 -47.2 -46.3 -47.2 71 -99 SPO 1997 10 09 13 19 34 10.1 -9 683.10 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 20 35 9.8 -9 683.00 -47.1 -46.2 -47.1 71 -99 SPO 1997 10 09 13 21 35 9.8 -9 683.00 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 22 34 9.7 -9 683.00 -47.2 -46.2 -47.2 72 -99 SPO 1997 10 09 13 23 34 9.7 -9 683.00 -47.2 -46.2 -47.2 74 -99 SPO 1997 10 09 13 24 34 9.4 -9 683.00 -47.1 -46.2 -47.2 73 -99 SPO 1997 10 09 13 25 34 9.4 -9 683.10 -47.1 -46.2 -47.2 71 -99 SPO 1997 10 09 13 26 33 9.5 -9 683.10 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 27 33 9.3 -9 683.10 -47.1 -46.2 -47.2 71 -99 SPO 1997 10 09 13 28 33 9.3 -9 683.10 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 29 32 9.3 -9 683.10 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 30 33 9.2 -9 683.10 -47.2 -46.2 -47.2 71 -99 SPO 1997 10 09 13 31 33 9.6 -9 683.10 -47.1 -46.1 -47.1 71 -99 SPO 1997 10 09 13 32 33 9.4 -9 683.00 -47.0 -46.2 -47.1 70 -99 SPO 1997 10 09 13 33 32 10.0 -9 683.00 -47.1 -46.2 -47.1 71 -99 SPO 1997 10 09 13 34 32 10.1 -9 683.00 -47.1 -46.2 -47.1 71 -99 SPO 1997 10 09 13 35 32 10.0 -9 683.00 -47.1 -46.2 -47.1 73 -99 SPO 1997 10 09 13 36 32 10.5 -9 683.00 -47.1 -46.1 -47.2 73 -99 SPO 1997 10 09 13 37 32 10.2 -9 683.00 -47.0 -46.1 -47.1 72 -99 SPO 1997 10 09 13 38 32 10.1 -9 682.90 -47.1 -46.1 -47.1 73 -99 SPO 1997 10 09 13 39 32 10.0 -9 682.90 -47.1 -46.1 -47.1 71 -99 SPO 1997 10 09 13 40 32 10.0 -9 682.90 -47.0 -46.1 -47.1 71 -99 SPO 1997 10 09 13 41 32 9.7 -9 682.90 -47.1 -46.1 -47.1 71 -99 SPO 1997 10 09 13 42 32 10.3 -9 682.90 -47.0 -46.1 -47.1 71 -99 SPO 1997 10 09 13 43 33 10.1 -9 682.90 -47.0 -46.1 -47.1 72 -99 SPO 1997 10 09 13 44 33 10.2 -9 682.90 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 13 45 33 9.9 -9 682.90 -47.0 -46.1 -47.0 72 -99 SPO 1997 10 09 13 46 32 9.8 -9 682.90 -47.0 -46.1 -47.0 73 -99 SPO 1997 10 09 13 47 32 9.5 -9 682.90 -47.0 -46.0 -47.0 73 -99 SPO 1997 10 09 13 48 32 9.6 -9 682.90 -47.0 -46.0 -47.0 74 -99 SPO 1997 10 09 13 49 33 9.6 -9 682.90 -47.0 -46.0 -47.0 73 -99 SPO 1997 10 09 13 50 33 9.7 -9 682.90 -47.0 -46.0 -47.0 72 -99 SPO 1997 10 09 13 51 33 9.8 -9 682.90 -47.0 -46.0 -47.0 72 -99 SPO 1997 10 09 13 52 33 9.7 -9 682.90 -47.0 -46.0 -47.0 71 -99 SPO 1997 10 09 13 53 33 10.2 -9 682.90 -47.0 -46.0 -46.9 71 -99 SPO 1997 10 09 13 54 33 10.1 -9 682.90 -46.9 -45.9 -46.9 70 -99 SPO 1997 10 09 13 55 32 10.1 -9 682.90 -46.9 -45.9 -46.9 72 -99 SPO 1997 10 09 13 56 32 9.7 -9 682.90 -46.9 -46.0 -46.9 72 -99 SPO 1997 10 09 13 57 33 9.8 -9 682.90 -46.9 -46.0 -46.9 73 -99 SPO 1997 10 09 13 58 33 9.8 -9 682.90 -46.8 -46.0 -46.8 72 -99 SPO 1997 10 09 13 59 33 9.8 -9 682.90 -46.8 -46.0 -46.8 73 -99 SPO 1997 10 09 14 00 33 9.9 -9 682.90 -46.8 -45.9 -46.8 74 0 SPO 1997 10 09 14 01 33 9.7 -9 682.90 -46.8 -46.0 -46.8 74 -99 SPO 1997 10 09 14 02 34 9.9 -9 682.90 -46.9 -45.9 -46.8 73 -99 SPO 1997 10 09 14 03 33 9.4 -9 682.90 -46.9 -45.9 -46.9 73 -99 SPO 1997 10 09 14 04 33 9.6 -9 682.90 -46.8 -45.9 -46.8 72 -99 SPO 1997 10 09 14 05 34 10.1 -9 682.90 -46.8 -45.8 -46.8 71 -99 SPO 1997 10 09 14 06 34 9.8 -9 682.90 -46.8 -45.8 -46.8 71 -99 SPO 1997 10 09 14 07 34 9.8 -9 682.90 -46.8 -45.9 -46.8 71 -99 SPO 1997 10 09 14 08 33 9.7 -9 682.90 -46.8 -45.9 -46.8 72 -99 SPO 1997 10 09 14 09 33 9.9 -9 682.80 -46.8 -45.9 -46.7 72 -99 SPO 1997 10 09 14 10 32 10.0 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 11 32 10.1 -9 682.90 -46.8 -45.9 -46.8 72 -99 SPO 1997 10 09 14 12 33 9.7 -9 682.90 -46.8 -45.9 -46.7 72 -99 SPO 1997 10 09 14 13 32 9.8 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 14 32 9.5 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 15 32 9.4 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 16 32 9.8 -9 682.90 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 14 17 33 9.6 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 18 32 9.8 -9 682.90 -46.7 -45.9 -46.7 72 -99 SPO 1997 10 09 14 19 32 9.7 -9 682.90 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 14 20 32 9.8 -9 682.90 -46.7 -45.8 -46.7 72 -99 SPO 1997 10 09 14 21 32 10.0 -9 682.90 -46.7 -45.8 -46.6 72 -99 SPO 1997 10 09 14 22 32 10.2 -9 682.90 -46.7 -45.8 -46.6 73 -99 SPO 1997 10 09 14 23 32 10.1 -9 682.90 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 14 24 33 10.1 -9 682.90 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 25 32 10.1 -9 682.90 -46.7 -45.8 -46.7 73 -99 SPO 1997 10 09 14 26 32 10.1 -9 682.90 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 27 33 10.1 -9 682.90 -46.7 -45.8 -46.6 73 -99 SPO 1997 10 09 14 28 32 10.3 -9 682.90 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 29 33 10.2 -9 682.90 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 14 30 33 10.1 -9 682.90 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 14 31 32 9.7 -9 682.90 -46.6 -45.7 -46.6 72 -99 SPO 1997 10 09 14 32 33 9.9 -9 682.90 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 33 32 9.3 -9 682.90 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 34 32 9.1 -9 682.90 -46.6 -45.8 -46.6 73 -99 SPO 1997 10 09 14 35 32 9.0 -9 682.90 -46.6 -45.7 -46.6 73 -99 SPO 1997 10 09 14 36 33 9.0 -9 683.00 -46.6 -45.8 -46.5 73 -99 SPO 1997 10 09 14 37 33 8.9 -9 683.00 -46.5 -45.8 -46.5 72 -99 SPO 1997 10 09 14 38 33 8.8 -9 683.00 -46.6 -45.8 -46.5 73 -99 SPO 1997 10 09 14 39 33 8.9 -9 683.00 -46.6 -45.8 -46.5 72 -99 SPO 1997 10 09 14 40 34 8.8 -9 683.00 -46.6 -45.8 -46.6 72 -99 SPO 1997 10 09 14 41 34 9.1 -9 683.00 -46.7 -45.7 -46.6 72 -99 SPO 1997 10 09 14 42 34 8.9 -9 683.00 -46.6 -45.7 -46.5 71 -99 SPO 1997 10 09 14 43 33 8.7 -9 683.00 -46.5 -45.8 -46.4 70 -99 SPO 1997 10 09 14 44 34 9.1 -9 683.00 -46.5 -45.7 -46.4 71 -99 SPO 1997 10 09 14 45 33 9.3 -9 682.90 -46.4 -45.6 -46.4 71 -99 SPO 1997 10 09 14 46 32 9.2 -9 682.90 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 14 47 31 9.5 -9 682.90 -46.4 -45.6 -46.3 72 -99 SPO 1997 10 09 14 48 33 9.6 -9 682.90 -46.3 -45.5 -46.3 72 -99 SPO 1997 10 09 14 49 33 9.8 -9 682.80 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 14 50 33 9.4 -9 682.80 -46.3 -45.5 -46.3 73 -99 SPO 1997 10 09 14 51 33 9.0 -9 682.80 -46.4 -45.5 -46.4 74 -99 SPO 1997 10 09 14 52 32 9.4 -9 682.80 -46.5 -45.5 -46.4 73 -99 SPO 1997 10 09 14 53 32 9.2 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 14 54 33 9.4 -9 682.80 -46.4 -45.6 -46.5 72 -99 SPO 1997 10 09 14 55 32 9.7 -9 682.80 -46.5 -45.5 -46.4 72 -99 SPO 1997 10 09 14 56 32 9.7 -9 682.80 -46.4 -45.5 -46.4 72 -99 SPO 1997 10 09 14 57 31 9.4 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 14 58 31 9.3 -9 682.80 -46.4 -45.5 -46.3 72 -99 SPO 1997 10 09 14 59 31 9.0 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 00 31 9.0 -9 682.80 -46.4 -45.7 -46.4 72 0 SPO 1997 10 09 15 01 30 8.8 -9 682.80 -46.4 -45.7 -46.4 72 -99 SPO 1997 10 09 15 02 31 8.9 -9 682.80 -46.5 -45.7 -46.5 73 -99 SPO 1997 10 09 15 03 32 8.9 -9 682.80 -46.6 -45.7 -46.5 74 -99 SPO 1997 10 09 15 04 32 9.3 -9 682.80 -46.6 -45.6 -46.5 73 -99 SPO 1997 10 09 15 05 32 9.2 -9 682.80 -46.5 -45.6 -46.4 72 -99 SPO 1997 10 09 15 06 33 9.4 -9 682.80 -46.5 -45.6 -46.5 72 -99 SPO 1997 10 09 15 07 33 9.3 -9 682.70 -46.5 -45.6 -46.5 72 -99 SPO 1997 10 09 15 08 31 9.4 -9 682.70 -46.5 -45.6 -46.5 72 -99 SPO 1997 10 09 15 09 32 9.8 -9 682.70 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 10 32 9.9 -9 682.70 -46.4 -45.5 -46.4 72 -99 SPO 1997 10 09 15 11 32 9.9 -9 682.70 -46.4 -45.4 -46.4 72 -99 SPO 1997 10 09 15 12 32 9.9 -9 682.70 -46.4 -45.4 -46.4 72 -99 SPO 1997 10 09 15 13 32 10.0 -9 682.70 -46.3 -45.4 -46.3 72 -99 SPO 1997 10 09 15 14 32 10.0 -9 682.60 -46.3 -45.3 -46.3 71 -99 SPO 1997 10 09 15 15 32 10.2 -9 682.60 -46.3 -45.3 -46.2 71 -99 SPO 1997 10 09 15 16 33 9.8 -9 682.70 -46.3 -45.4 -46.2 72 -99 SPO 1997 10 09 15 17 33 10.0 -9 682.70 -46.3 -45.4 -46.2 71 -99 SPO 1997 10 09 15 18 33 9.8 -9 682.70 -46.3 -45.5 -46.2 71 -99 SPO 1997 10 09 15 19 33 9.3 -9 682.80 -46.2 -45.5 -46.2 71 -99 SPO 1997 10 09 15 20 34 9.0 -9 682.80 -46.3 -45.6 -46.4 72 -99 SPO 1997 10 09 15 21 33 8.8 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 22 34 8.5 -9 682.80 -46.5 -45.6 -46.5 74 -99 SPO 1997 10 09 15 23 33 8.7 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 24 35 8.2 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 25 35 8.0 -9 682.80 -46.5 -45.7 -46.5 73 -99 SPO 1997 10 09 15 26 35 8.2 -9 682.80 -46.5 -45.6 -46.4 72 -99 SPO 1997 10 09 15 27 34 8.2 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 28 35 8.5 -9 682.80 -46.4 -45.7 -46.3 72 -99 SPO 1997 10 09 15 29 34 8.5 -9 682.80 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 30 34 8.6 -9 682.70 -46.4 -45.6 -46.4 72 -99 SPO 1997 10 09 15 31 33 8.2 -9 682.70 -46.5 -45.6 -46.4 72 -99 SPO 1997 10 09 15 32 33 8.4 -9 682.70 -46.5 -45.6 -46.4 71 -99 SPO 1997 10 09 15 33 33 8.7 -9 682.70 -46.5 -45.6 -46.4 71 -99 SPO 1997 10 09 15 34 33 9.0 -9 682.70 -46.4 -45.5 -46.3 71 -99 SPO 1997 10 09 15 35 34 8.9 -9 682.70 -46.3 -45.5 -46.2 71 -99 SPO 1997 10 09 15 36 33 9.2 -9 682.60 -46.3 -45.5 -46.3 71 -99 SPO 1997 10 09 15 37 31 9.8 -9 682.60 -46.2 -45.3 -46.2 70 -99 SPO 1997 10 09 15 38 32 9.4 -9 682.60 -46.2 -45.4 -46.2 71 -99 SPO 1997 10 09 15 39 33 9.5 -9 682.60 -46.2 -45.4 -46.2 71 -99 SPO 1997 10 09 15 40 33 9.6 -9 682.60 -46.3 -45.4 -46.3 72 -99 SPO 1997 10 09 15 41 32 10.0 -9 682.60 -46.3 -45.3 -46.2 72 -99 SPO 1997 10 09 15 42 32 9.6 -9 682.60 -46.2 -45.3 -46.2 72 -99 SPO 1997 10 09 15 43 32 8.9 -9 682.60 -46.3 -45.3 -46.2 72 -99 SPO 1997 10 09 15 44 33 9.4 -9 682.60 -46.3 -45.3 -46.2 72 -99 SPO 1997 10 09 15 45 33 9.5 -9 682.60 -46.3 -45.3 -46.2 72 -99 SPO 1997 10 09 15 46 35 9.4 -9 682.60 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 15 47 34 9.3 -9 682.60 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 15 48 35 9.3 -9 682.60 -46.3 -45.3 -46.2 73 -99 SPO 1997 10 09 15 49 35 9.2 -9 682.60 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 15 50 35 9.4 -9 682.60 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 15 51 35 9.1 -9 682.60 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 15 52 34 8.7 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 15 53 34 9.1 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 15 54 33 8.8 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 15 55 33 8.7 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 15 56 32 8.8 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 15 57 33 8.7 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 15 58 32 9.2 -9 682.60 -46.2 -45.4 -46.2 71 -99 SPO 1997 10 09 15 59 31 9.3 -9 682.60 -46.2 -45.4 -46.1 71 -99 SPO 1997 10 09 16 00 32 9.5 -9 682.60 -46.1 -45.4 -46.1 71 0 SPO 1997 10 09 16 01 29 9.2 -9 682.60 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 16 02 31 9.9 -9 682.50 -46.1 -45.3 -46.0 72 -99 SPO 1997 10 09 16 03 32 10.2 -9 682.50 -45.9 -45.2 -45.9 72 -99 SPO 1997 10 09 16 04 33 9.9 -9 682.50 -46.0 -45.2 -46.0 73 -99 SPO 1997 10 09 16 05 33 9.9 -9 682.50 -46.1 -45.2 -46.1 73 -99 SPO 1997 10 09 16 06 32 9.8 -9 682.50 -46.0 -45.1 -46.0 72 -99 SPO 1997 10 09 16 07 32 9.6 -9 682.50 -46.0 -45.3 -46.0 72 -99 SPO 1997 10 09 16 08 32 9.5 -9 682.50 -46.2 -45.4 -46.1 73 -99 SPO 1997 10 09 16 09 34 9.5 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 10 33 9.3 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 16 11 34 9.3 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 16 12 33 9.1 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 16 13 34 9.5 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 16 14 33 9.4 -9 682.60 -46.2 -45.5 -46.2 72 -99 SPO 1997 10 09 16 15 34 9.1 -9 682.60 -46.3 -45.4 -46.3 73 -99 SPO 1997 10 09 16 16 33 9.4 -9 682.60 -46.3 -45.4 -46.2 73 -99 SPO 1997 10 09 16 17 34 9.4 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 16 18 33 9.4 -9 682.60 -46.3 -45.4 -46.2 72 -99 SPO 1997 10 09 16 19 33 9.2 -9 682.60 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 16 20 32 9.1 -9 682.60 -46.3 -45.4 -46.2 72 -99 SPO 1997 10 09 16 21 33 8.9 -9 682.60 -46.3 -45.5 -46.3 71 -99 SPO 1997 10 09 16 22 32 9.2 -9 682.60 -46.3 -45.5 -46.2 71 -99 SPO 1997 10 09 16 23 32 8.9 -9 682.60 -46.3 -45.5 -46.2 70 -99 SPO 1997 10 09 16 24 32 9.0 -9 682.60 -46.3 -45.5 -46.2 71 -99 SPO 1997 10 09 16 25 31 9.2 -9 682.60 -46.3 -45.6 -46.3 72 -99 SPO 1997 10 09 16 26 31 9.4 -9 682.60 -46.2 -45.5 -46.2 71 -99 SPO 1997 10 09 16 27 31 9.3 -9 682.50 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 16 28 31 9.6 -9 682.50 -46.3 -45.5 -46.3 72 -99 SPO 1997 10 09 16 29 31 9.6 -9 682.50 -46.3 -45.4 -46.2 73 -99 SPO 1997 10 09 16 30 32 9.7 -9 682.50 -46.3 -45.4 -46.2 73 -99 SPO 1997 10 09 16 31 31 9.8 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 32 32 9.8 -9 682.50 -46.2 -45.4 -46.2 71 -99 SPO 1997 10 09 16 33 32 9.9 -9 682.50 -46.2 -45.3 -46.2 71 -99 SPO 1997 10 09 16 34 31 9.5 -9 682.50 -46.2 -45.3 -46.1 71 -99 SPO 1997 10 09 16 35 32 9.4 -9 682.50 -46.2 -45.3 -46.2 71 -99 SPO 1997 10 09 16 36 32 9.2 -9 682.50 -46.3 -45.3 -46.2 73 -99 SPO 1997 10 09 16 37 32 9.2 -9 682.50 -46.3 -45.4 -46.2 73 -99 SPO 1997 10 09 16 38 32 9.4 -9 682.50 -46.2 -45.3 -46.1 72 -99 SPO 1997 10 09 16 39 32 9.1 -9 682.50 -46.1 -45.4 -46.1 72 -99 SPO 1997 10 09 16 40 33 9.2 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 41 33 9.1 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 42 32 8.9 -9 682.50 -46.2 -45.5 -46.2 72 -99 SPO 1997 10 09 16 43 33 8.8 -9 682.60 -46.3 -45.5 -46.2 73 -99 SPO 1997 10 09 16 44 34 9.0 -9 682.50 -46.3 -45.5 -46.2 72 -99 SPO 1997 10 09 16 45 33 9.5 -9 682.50 -46.2 -45.5 -46.2 72 -99 SPO 1997 10 09 16 46 35 9.2 -9 682.50 -46.2 -45.4 -46.1 71 -99 SPO 1997 10 09 16 47 34 9.4 -9 682.50 -46.2 -45.4 -46.1 71 -99 SPO 1997 10 09 16 48 34 9.2 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 49 35 9.0 -9 682.50 -46.2 -45.4 -46.2 72 -99 SPO 1997 10 09 16 50 34 9.5 -9 682.50 -46.2 -45.4 -46.2 73 -99 SPO 1997 10 09 16 51 33 9.4 -9 682.50 -46.2 -45.4 -46.2 73 -99 SPO 1997 10 09 16 52 33 9.6 -9 682.50 -46.2 -45.4 -46.2 73 -99 SPO 1997 10 09 16 53 34 9.8 -9 682.40 -46.2 -45.3 -46.2 73 -99 SPO 1997 10 09 16 54 34 9.9 -9 682.40 -46.2 -45.3 -46.1 73 -99 SPO 1997 10 09 16 55 34 9.8 -9 682.40 -46.2 -45.2 -46.1 72 -99 SPO 1997 10 09 16 56 34 10.0 -9 682.40 -46.1 -45.2 -46.1 72 -99 SPO 1997 10 09 16 57 34 9.8 -9 682.40 -46.1 -45.2 -46.1 72 -99 SPO 1997 10 09 16 58 33 9.6 -9 682.40 -46.1 -45.2 -46.1 71 -99 SPO 1997 10 09 16 59 33 9.7 -9 682.40 -46.2 -45.3 -46.1 72 -99 SPO 1997 10 09 17 00 33 9.5 -9 682.40 -46.1 -45.3 -46.0 72 0 SPO 1997 10 09 17 01 33 9.4 -9 682.40 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 02 33 9.8 -9 682.40 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 03 32 9.6 -9 682.30 -46.0 -45.3 -46.0 71 -99 SPO 1997 10 09 17 04 33 9.7 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 05 33 9.9 -9 682.30 -46.1 -45.2 -46.1 72 -99 SPO 1997 10 09 17 06 32 9.7 -9 682.30 -46.1 -45.2 -46.1 72 -99 SPO 1997 10 09 17 07 32 10.0 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 08 32 9.8 -9 682.30 -46.0 -45.3 -46.0 72 -99 SPO 1997 10 09 17 09 32 9.6 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 10 32 9.4 -9 682.30 -46.1 -45.3 -46.0 72 -99 SPO 1997 10 09 17 11 32 9.6 -9 682.30 -46.1 -45.3 -46.0 72 -99 SPO 1997 10 09 17 12 33 9.3 -9 682.30 -46.1 -45.3 -46.0 72 -99 SPO 1997 10 09 17 13 33 9.2 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 14 32 9.7 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 15 33 9.8 -9 682.30 -46.1 -45.2 -46.1 72 -99 SPO 1997 10 09 17 16 33 10.1 -9 682.30 -46.1 -45.2 -46.0 72 -99 SPO 1997 10 09 17 17 33 9.5 -9 682.30 -46.0 -45.2 -46.0 73 -99 SPO 1997 10 09 17 18 33 9.4 -9 682.30 -46.1 -45.3 -46.0 74 -99 SPO 1997 10 09 17 19 33 9.7 -9 682.30 -46.0 -45.3 -46.0 73 -99 SPO 1997 10 09 17 20 34 9.6 -9 682.30 -46.0 -45.3 -46.0 73 -99 SPO 1997 10 09 17 21 34 9.5 -9 682.30 -46.0 -45.3 -46.0 73 -99 SPO 1997 10 09 17 22 35 9.5 -9 682.30 -46.0 -45.3 -46.0 72 -99 SPO 1997 10 09 17 23 35 9.7 -9 682.30 -46.0 -45.3 -46.0 72 -99 SPO 1997 10 09 17 24 36 9.3 -9 682.30 -46.0 -45.3 -46.1 72 -99 SPO 1997 10 09 17 25 34 9.5 -9 682.30 -46.1 -45.3 -46.1 72 -99 SPO 1997 10 09 17 26 34 9.8 -9 682.30 -46.1 -45.3 -46.0 73 -99 SPO 1997 10 09 17 27 35 10.2 -9 682.30 -46.0 -45.2 -46.0 73 -99 SPO 1997 10 09 17 28 36 10.0 -9 682.20 -46.0 -45.2 -46.0 73 -99 SPO 1997 10 09 17 29 35 10.2 -9 682.20 -46.0 -45.2 -46.0 73 -99 SPO 1997 10 09 17 30 35 10.2 -9 682.20 -46.0 -45.1 -46.0 73 -99 SPO 1997 10 09 17 31 35 10.5 -9 682.10 -45.9 -45.1 -46.0 73 -99 SPO 1997 10 09 17 32 35 10.3 -9 682.10 -45.9 -45.1 -46.0 72 -99 SPO 1997 10 09 17 33 34 11.2 -9 682.10 -45.9 -45.0 -45.9 72 -99 SPO 1997 10 09 17 34 34 10.7 -9 682.10 -45.8 -45.1 -45.8 71 -99 SPO 1997 10 09 17 35 34 10.7 -9 682.10 -45.9 -45.1 -45.9 73 -99 SPO 1997 10 09 17 36 34 11.4 -9 682.10 -45.8 -45.0 -45.8 72 -99 SPO 1997 10 09 17 37 34 10.9 -9 682.10 -45.8 -45.0 -45.8 73 -99 SPO 1997 10 09 17 38 34 11.1 -9 682.10 -45.8 -45.0 -45.8 73 -99 SPO 1997 10 09 17 39 34 11.4 -9 682.10 -45.8 -45.0 -45.8 74 -99 SPO 1997 10 09 17 40 34 11.4 -9 682.10 -45.8 -44.9 -45.8 74 -99 SPO 1997 10 09 17 41 33 11.7 -9 682.10 -45.7 -44.9 -45.7 74 -99 SPO 1997 10 09 17 42 34 11.4 -9 682.10 -45.7 -44.8 -45.7 74 -99 SPO 1997 10 09 17 43 35 11.3 -9 682.10 -45.6 -44.8 -45.6 73 -99 SPO 1997 10 09 17 44 34 11.3 -9 682.10 -45.6 -44.9 -45.7 73 -99 SPO 1997 10 09 17 45 35 11.7 -9 682.10 -45.6 -44.9 -45.7 73 -99 SPO 1997 10 09 17 46 35 11.6 -9 682.10 -45.6 -44.9 -45.7 73 -99 SPO 1997 10 09 17 47 34 11.1 -9 682.10 -45.6 -44.8 -45.6 72 -99 SPO 1997 10 09 17 48 34 11.3 -9 682.20 -45.7 -44.8 -45.8 73 -99 SPO 1997 10 09 17 49 33 10.7 -9 682.20 -45.7 -44.9 -45.8 73 -99 SPO 1997 10 09 17 50 34 11.1 -9 682.20 -45.8 -44.9 -45.8 74 -99 SPO 1997 10 09 17 51 33 11.1 -9 682.20 -45.7 -45.0 -45.7 73 -99 SPO 1997 10 09 17 52 33 11.0 -9 682.20 -45.7 -45.0 -45.7 74 -99 SPO 1997 10 09 17 53 32 10.9 -9 682.20 -45.7 -44.9 -45.7 74 -99 SPO 1997 10 09 17 54 33 11.1 -9 682.20 -45.7 -44.9 -45.7 74 -99 SPO 1997 10 09 17 55 32 10.9 -9 682.20 -45.6 -44.9 -45.6 73 -99 SPO 1997 10 09 17 56 32 10.8 -9 682.20 -45.7 -44.9 -45.7 74 -99 SPO 1997 10 09 17 57 32 10.7 -9 682.20 -45.7 -44.9 -45.7 74 -99 SPO 1997 10 09 17 58 32 10.8 -9 682.20 -45.7 -44.9 -45.7 73 -99 SPO 1997 10 09 17 59 31 10.8 -9 682.20 -45.6 -44.8 -45.6 73 -99 SPO 1997 10 09 18 00 31 10.7 -9 682.30 -45.6 -44.9 -45.6 73 0 SPO 1997 10 09 18 01 31 10.7 -9 682.20 -45.6 -44.8 -45.6 73 -99 SPO 1997 10 09 18 02 31 10.7 -9 682.20 -45.6 -44.8 -45.6 73 -99 SPO 1997 10 09 18 03 31 10.9 -9 682.20 -45.6 -44.8 -45.6 73 -99 SPO 1997 10 09 18 04 30 11.2 -9 682.20 -45.6 -44.7 -45.6 73 -99 SPO 1997 10 09 18 05 30 11.4 -9 682.20 -45.5 -44.6 -45.5 73 -99 SPO 1997 10 09 18 06 30 11.4 -9 682.20 -45.5 -44.6 -45.5 73 -99 SPO 1997 10 09 18 07 30 11.8 -9 682.20 -45.4 -44.6 -45.4 73 -99 SPO 1997 10 09 18 08 29 11.6 -9 682.20 -45.4 -44.6 -45.4 73 -99 SPO 1997 10 09 18 09 28 11.2 -9 682.20 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 10 28 11.3 -9 682.20 -45.4 -44.7 -45.5 73 -99 SPO 1997 10 09 18 11 28 11.2 -9 682.20 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 12 27 10.8 -9 682.30 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 13 27 11.1 -9 682.30 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 14 27 10.5 -9 682.30 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 15 27 10.2 -9 682.30 -45.5 -44.8 -45.5 75 -99 SPO 1997 10 09 18 16 28 10.3 -9 682.30 -45.5 -44.8 -45.5 75 -99 SPO 1997 10 09 18 17 28 10.3 -9 682.30 -45.4 -44.8 -45.4 74 -99 SPO 1997 10 09 18 18 28 10.4 -9 682.30 -45.5 -44.8 -45.5 75 -99 SPO 1997 10 09 18 19 29 10.3 -9 682.30 -45.5 -44.8 -45.5 75 -99 SPO 1997 10 09 18 20 30 10.5 -9 682.30 -45.5 -44.7 -45.5 75 -99 SPO 1997 10 09 18 21 30 10.6 -9 682.30 -45.5 -44.7 -45.4 74 -99 SPO 1997 10 09 18 22 30 10.6 -9 682.30 -45.5 -44.7 -45.5 74 -99 SPO 1997 10 09 18 23 30 10.7 -9 682.30 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 24 29 10.6 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 25 28 10.3 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 26 29 10.4 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 27 27 10.1 -9 682.30 -45.4 -44.7 -45.4 74 -99 SPO 1997 10 09 18 28 27 10.2 -9 682.30 -45.4 -44.7 -45.4 74 -99 SPO 1997 10 09 18 29 27 10.1 -9 682.40 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 18 30 27 10.1 -9 682.40 -45.4 -44.8 -45.4 75 -99 SPO 1997 10 09 18 31 27 9.6 -9 682.40 -45.4 -44.8 -45.4 75 -99 SPO 1997 10 09 18 32 27 10.0 -9 682.40 -45.5 -44.8 -45.4 75 -99 SPO 1997 10 09 18 33 27 10.1 -9 682.40 -45.5 -44.8 -45.4 75 -99 SPO 1997 10 09 18 34 27 10.1 -9 682.40 -45.4 -44.7 -45.4 74 -99 SPO 1997 10 09 18 35 26 10.0 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 36 27 9.8 -9 682.40 -45.3 -44.7 -45.3 73 -99 SPO 1997 10 09 18 37 27 9.8 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 38 27 10.1 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 39 27 9.4 -9 682.40 -45.5 -44.7 -45.4 74 -99 SPO 1997 10 09 18 40 27 9.6 -9 682.40 -45.5 -44.8 -45.4 75 -99 SPO 1997 10 09 18 41 27 9.7 -9 682.40 -45.5 -44.7 -45.4 75 -99 SPO 1997 10 09 18 42 27 9.7 -9 682.40 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 18 43 27 9.6 -9 682.40 -45.4 -44.8 -45.4 73 -99 SPO 1997 10 09 18 44 27 9.0 -9 682.50 -45.5 -44.8 -45.4 75 -99 SPO 1997 10 09 18 45 26 9.0 -9 682.50 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 18 46 27 9.2 -9 682.50 -45.5 -44.8 -45.4 76 -99 SPO 1997 10 09 18 47 27 9.2 -9 682.50 -45.4 -44.9 -45.4 74 -99 SPO 1997 10 09 18 48 28 8.7 -9 682.50 -45.4 -44.9 -45.4 74 -99 SPO 1997 10 09 18 49 27 8.9 -9 682.50 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 18 50 27 8.6 -9 682.50 -45.5 -44.9 -45.4 74 -99 SPO 1997 10 09 18 51 26 8.1 -9 682.50 -45.6 -45.0 -45.5 74 -99 SPO 1997 10 09 18 52 26 8.4 -9 682.50 -45.6 -45.0 -45.5 74 -99 SPO 1997 10 09 18 53 27 8.6 -9 682.50 -45.5 -44.9 -45.5 73 -99 SPO 1997 10 09 18 54 27 8.7 -9 682.50 -45.4 -44.9 -45.4 73 -99 SPO 1997 10 09 18 55 27 8.8 -9 682.50 -45.5 -44.9 -45.4 74 -99 SPO 1997 10 09 18 56 28 8.4 -9 682.50 -45.4 -44.8 -45.4 73 -99 SPO 1997 10 09 18 57 27 8.7 -9 682.50 -45.5 -44.8 -45.4 74 -99 SPO 1997 10 09 18 58 27 9.0 -9 682.40 -45.4 -44.8 -45.4 74 -99 SPO 1997 10 09 18 59 27 8.6 -9 682.50 -45.4 -44.7 -45.3 73 -99 SPO 1997 10 09 19 00 27 8.7 -9 682.50 -45.4 -44.7 -45.4 73 0 SPO 1997 10 09 19 01 27 8.3 -9 682.50 -45.4 -44.7 -45.3 74 -99 SPO 1997 10 09 19 02 27 7.9 -9 682.50 -45.4 -44.8 -45.4 73 -99 SPO 1997 10 09 19 03 27 8.0 -9 682.50 -45.5 -44.8 -45.4 74 -99 SPO 1997 10 09 19 04 27 7.7 -9 682.50 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 19 05 27 8.2 -9 682.50 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 19 06 27 8.1 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 07 27 7.8 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 08 28 8.0 -9 682.60 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 19 09 26 8.4 -9 682.50 -45.5 -44.8 -45.4 75 -99 SPO 1997 10 09 19 10 27 8.3 -9 682.50 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 11 28 8.2 -9 682.50 -45.4 -44.8 -45.4 74 -99 SPO 1997 10 09 19 12 27 8.3 -9 682.50 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 13 27 8.3 -9 682.50 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 14 29 8.0 -9 682.50 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 15 28 7.9 -9 682.50 -45.3 -44.8 -45.3 73 -99 SPO 1997 10 09 19 16 28 7.7 -9 682.60 -45.4 -44.8 -45.3 73 -99 SPO 1997 10 09 19 17 28 7.9 -9 682.60 -45.4 -44.8 -45.4 73 -99 SPO 1997 10 09 19 18 29 7.6 -9 682.60 -45.5 -44.8 -45.4 74 -99 SPO 1997 10 09 19 19 29 7.7 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 20 28 7.4 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 21 29 7.1 -9 682.50 -45.4 -44.8 -45.3 75 -99 SPO 1997 10 09 19 22 29 7.0 -9 682.60 -45.4 -44.9 -45.4 74 -99 SPO 1997 10 09 19 23 29 6.9 -9 682.60 -45.4 -44.9 -45.4 74 -99 SPO 1997 10 09 19 24 28 7.2 -9 682.60 -45.5 -44.9 -45.4 75 -99 SPO 1997 10 09 19 25 29 7.5 -9 682.60 -45.5 -44.9 -45.4 74 -99 SPO 1997 10 09 19 26 29 7.8 -9 682.60 -45.5 -44.8 -45.3 74 -99 SPO 1997 10 09 19 27 28 7.9 -9 682.60 -45.5 -44.8 -45.3 74 -99 SPO 1997 10 09 19 28 28 8.0 -9 682.50 -45.4 -44.8 -45.3 73 -99 SPO 1997 10 09 19 29 29 8.0 -9 682.60 -45.4 -44.7 -45.3 74 -99 SPO 1997 10 09 19 30 28 7.8 -9 682.60 -45.4 -44.7 -45.3 74 -99 SPO 1997 10 09 19 31 28 8.0 -9 682.60 -45.4 -44.7 -45.2 75 -99 SPO 1997 10 09 19 32 28 7.4 -9 682.60 -45.3 -44.7 -45.3 74 -99 SPO 1997 10 09 19 33 29 7.1 -9 682.60 -45.4 -44.7 -45.3 75 -99 SPO 1997 10 09 19 34 28 7.0 -9 682.60 -45.4 -44.8 -45.3 76 -99 SPO 1997 10 09 19 35 28 7.5 -9 682.60 -45.4 -44.7 -45.2 75 -99 SPO 1997 10 09 19 36 29 7.1 -9 682.60 -45.3 -44.7 -45.3 74 -99 SPO 1997 10 09 19 37 29 7.0 -9 682.60 -45.4 -44.8 -45.3 75 -99 SPO 1997 10 09 19 38 30 7.1 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 39 29 7.3 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 40 29 7.0 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 41 31 7.0 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 42 31 7.1 -9 682.70 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 43 32 6.9 -9 682.70 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 44 32 6.5 -9 682.70 -45.4 -44.8 -45.3 75 -99 SPO 1997 10 09 19 45 32 6.9 -9 682.70 -45.4 -44.8 -45.3 75 -99 SPO 1997 10 09 19 46 35 6.8 -9 682.70 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 47 33 7.2 -9 682.70 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 48 34 6.9 -9 682.70 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 49 35 6.8 -9 682.70 -45.4 -44.8 -45.3 76 -99 SPO 1997 10 09 19 50 35 6.5 -9 682.70 -45.4 -44.8 -45.3 76 -99 SPO 1997 10 09 19 51 35 6.5 -9 682.70 -45.5 -44.8 -45.3 76 -99 SPO 1997 10 09 19 52 33 6.6 -9 682.70 -45.5 -44.8 -45.3 75 -99 SPO 1997 10 09 19 53 34 6.8 -9 682.70 -45.4 -44.8 -45.3 73 -99 SPO 1997 10 09 19 54 34 6.8 -9 682.60 -45.4 -44.8 -45.3 73 -99 SPO 1997 10 09 19 55 32 7.1 -9 682.60 -45.4 -44.8 -45.2 73 -99 SPO 1997 10 09 19 56 33 7.2 -9 682.60 -45.4 -44.8 -45.2 74 -99 SPO 1997 10 09 19 57 32 7.2 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 58 33 7.4 -9 682.60 -45.4 -44.8 -45.3 74 -99 SPO 1997 10 09 19 59 33 7.9 -9 682.50 -45.3 -44.7 -45.2 73 -99 SPO 1997 10 09 20 00 34 8.1 -9 682.50 -45.3 -44.6 -45.2 74 0 SPO 1997 10 09 20 01 35 8.6 -9 682.50 -45.3 -44.6 -45.2 75 -99 SPO 1997 10 09 20 02 35 8.6 -9 682.40 -45.3 -44.6 -45.2 78 -99 SPO 1997 10 09 20 03 35 8.9 -9 682.40 -45.2 -44.5 -45.2 77 -99 SPO 1997 10 09 20 04 34 9.2 -9 682.40 -45.2 -44.5 -45.1 76 -99 SPO 1997 10 09 20 05 35 9.3 -9 682.40 -45.1 -44.5 -45.1 75 -99 SPO 1997 10 09 20 06 34 9.1 -9 682.40 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 20 07 34 9.0 -9 682.30 -45.3 -44.4 -45.2 78 -99 SPO 1997 10 09 20 08 33 9.3 -9 682.40 -45.3 -44.4 -45.2 78 -99 SPO 1997 10 09 20 09 33 9.3 -9 682.30 -45.2 -44.4 -45.2 77 -99 SPO 1997 10 09 20 10 33 9.6 -9 682.30 -45.2 -44.3 -45.2 77 -99 SPO 1997 10 09 20 11 32 9.3 -9 682.30 -45.2 -44.3 -45.2 76 -99 SPO 1997 10 09 20 12 32 9.5 -9 682.30 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 20 13 32 9.7 -9 682.30 -45.3 -44.4 -45.2 77 -99 SPO 1997 10 09 20 14 32 9.3 -9 682.30 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 20 15 32 9.2 -9 682.30 -45.3 -44.5 -45.2 77 -99 SPO 1997 10 09 20 16 33 9.2 -9 682.30 -45.3 -44.4 -45.2 75 -99 SPO 1997 10 09 20 17 32 9.1 -9 682.30 -45.2 -44.5 -45.2 74 -99 SPO 1997 10 09 20 18 33 9.0 -9 682.30 -45.2 -44.5 -45.2 74 -99 SPO 1997 10 09 20 19 32 9.0 -9 682.30 -45.3 -44.5 -45.2 75 -99 SPO 1997 10 09 20 20 32 9.0 -9 682.30 -45.3 -44.4 -45.2 75 -99 SPO 1997 10 09 20 21 33 9.1 -9 682.20 -45.3 -44.5 -45.2 77 -99 SPO 1997 10 09 20 22 33 9.1 -9 682.20 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 20 23 32 9.1 -9 682.20 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 20 24 32 8.9 -9 682.20 -45.2 -44.4 -45.1 76 -99 SPO 1997 10 09 20 25 32 8.8 -9 682.20 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 20 26 32 9.0 -9 682.20 -45.3 -44.5 -45.3 78 -99 SPO 1997 10 09 20 27 32 9.3 -9 682.20 -45.3 -44.4 -45.2 78 -99 SPO 1997 10 09 20 28 33 9.4 -9 682.20 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 20 29 33 9.4 -9 682.20 -45.2 -44.4 -45.2 74 -99 SPO 1997 10 09 20 30 32 9.4 -9 682.20 -45.2 -44.4 -45.2 73 -99 SPO 1997 10 09 20 31 31 9.3 -9 682.20 -45.2 -44.5 -45.2 73 -99 SPO 1997 10 09 20 32 31 9.4 -9 682.20 -45.3 -44.5 -45.2 75 -99 SPO 1997 10 09 20 33 31 9.6 -9 682.10 -45.3 -44.5 -45.2 75 -99 SPO 1997 10 09 20 34 31 9.6 -9 682.10 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 20 35 31 9.6 -9 682.10 -45.3 -44.5 -45.3 77 -99 SPO 1997 10 09 20 36 31 9.5 -9 682.10 -45.3 -44.5 -45.3 77 -99 SPO 1997 10 09 20 37 31 9.5 -9 682.10 -45.3 -44.4 -45.3 77 -99 SPO 1997 10 09 20 38 32 9.7 -9 682.10 -45.3 -44.4 -45.3 78 -99 SPO 1997 10 09 20 39 32 10.0 -9 682.10 -45.3 -44.4 -45.3 78 -99 SPO 1997 10 09 20 40 32 10.0 -9 682.10 -45.3 -44.4 -45.3 78 -99 SPO 1997 10 09 20 41 32 9.9 -9 682.10 -45.3 -44.4 -45.3 77 -99 SPO 1997 10 09 20 42 31 9.7 -9 682.10 -45.3 -44.4 -45.3 77 -99 SPO 1997 10 09 20 43 31 9.6 -9 682.10 -45.3 -44.4 -45.3 75 -99 SPO 1997 10 09 20 44 31 9.7 -9 682.10 -45.3 -44.4 -45.3 75 -99 SPO 1997 10 09 20 45 30 9.4 -9 682.10 -45.3 -44.5 -45.3 75 -99 SPO 1997 10 09 20 46 31 9.4 -9 682.10 -45.3 -44.5 -45.3 77 -99 SPO 1997 10 09 20 47 31 9.4 -9 682.10 -45.3 -44.5 -45.3 75 -99 SPO 1997 10 09 20 48 31 9.3 -9 682.10 -45.3 -44.6 -45.4 75 -99 SPO 1997 10 09 20 49 31 9.4 -9 682.10 -45.4 -44.6 -45.4 78 -99 SPO 1997 10 09 20 50 31 9.3 -9 682.10 -45.4 -44.7 -45.4 79 -99 SPO 1997 10 09 20 51 31 9.5 -9 682.10 -45.4 -44.7 -45.4 78 -99 SPO 1997 10 09 20 52 30 9.5 -9 682.10 -45.4 -44.7 -45.4 78 -99 SPO 1997 10 09 20 53 31 9.6 -9 682.10 -45.4 -44.7 -45.4 76 -99 SPO 1997 10 09 20 54 32 9.4 -9 682.10 -45.3 -44.7 -45.4 74 -99 SPO 1997 10 09 20 55 33 9.5 -9 682.10 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 20 56 32 9.6 -9 682.10 -45.4 -44.6 -45.5 74 -99 SPO 1997 10 09 20 57 33 9.7 -9 682.10 -45.4 -44.6 -45.4 75 -99 SPO 1997 10 09 20 58 33 10.3 -9 682.00 -45.4 -44.6 -45.4 76 -99 SPO 1997 10 09 20 59 33 10.4 -9 682.00 -45.2 -44.6 -45.3 76 -99 SPO 1997 10 09 21 00 33 10.2 -9 682.00 -45.3 -44.6 -45.4 77 0 SPO 1997 10 09 21 01 33 10.2 -9 682.00 -45.3 -44.6 -45.4 77 -99 SPO 1997 10 09 21 02 33 10.0 -9 682.10 -45.3 -44.6 -45.4 77 -99 SPO 1997 10 09 21 03 34 9.8 -9 682.10 -45.3 -44.6 -45.4 77 -99 SPO 1997 10 09 21 04 34 10.2 -9 682.10 -45.4 -44.6 -45.4 78 -99 SPO 1997 10 09 21 05 34 10.1 -9 682.10 -45.3 -44.6 -45.4 75 -99 SPO 1997 10 09 21 06 34 10.1 -9 682.00 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 21 07 33 10.1 -9 682.10 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 21 08 33 10.3 -9 682.00 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 21 09 33 10.4 -9 682.10 -45.4 -44.7 -45.4 75 -99 SPO 1997 10 09 21 10 33 10.3 -9 682.10 -45.4 -44.7 -45.4 76 -99 SPO 1997 10 09 21 11 33 10.0 -9 682.10 -45.4 -44.8 -45.4 76 -99 SPO 1997 10 09 21 12 33 10.1 -9 682.10 -45.5 -44.7 -45.5 79 -99 SPO 1997 10 09 21 13 34 9.9 -9 682.10 -45.5 -44.7 -45.5 77 -99 SPO 1997 10 09 21 14 34 9.9 -9 682.10 -45.5 -44.8 -45.5 77 -99 SPO 1997 10 09 21 15 34 9.8 -9 682.10 -45.5 -44.8 -45.6 77 -99 SPO 1997 10 09 21 16 34 9.8 -9 682.10 -45.5 -44.8 -45.6 77 -99 SPO 1997 10 09 21 17 34 10.2 -9 682.10 -45.5 -44.7 -45.6 76 -99 SPO 1997 10 09 21 18 33 10.0 -9 682.00 -45.5 -44.7 -45.5 76 -99 SPO 1997 10 09 21 19 33 10.0 -9 682.00 -45.5 -44.7 -45.5 75 -99 SPO 1997 10 09 21 20 33 10.6 -9 682.00 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 21 21 32 10.1 -9 682.10 -45.4 -44.6 -45.5 73 -99 SPO 1997 10 09 21 22 31 10.3 -9 682.10 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 21 23 31 10.1 -9 682.10 -45.4 -44.7 -45.4 74 -99 SPO 1997 10 09 21 24 32 10.5 -9 682.00 -45.4 -44.7 -45.4 74 -99 SPO 1997 10 09 21 25 31 10.8 -9 682.00 -45.3 -44.6 -45.4 74 -99 SPO 1997 10 09 21 26 31 10.3 -9 682.00 -45.3 -44.7 -45.4 75 -99 SPO 1997 10 09 21 27 30 10.4 -9 682.00 -45.4 -44.8 -45.5 76 -99 SPO 1997 10 09 21 28 30 10.0 -9 682.00 -45.4 -44.8 -45.4 76 -99 SPO 1997 10 09 21 29 30 10.4 -9 682.00 -45.4 -44.8 -45.4 76 -99 SPO 1997 10 09 21 30 30 10.5 -9 682.00 -45.3 -44.7 -45.4 74 -99 SPO 1997 10 09 21 31 29 10.0 -9 682.00 -45.4 -44.7 -45.5 75 -99 SPO 1997 10 09 21 32 29 10.3 -9 682.00 -45.4 -44.7 -45.5 75 -99 SPO 1997 10 09 21 33 31 10.2 -9 682.00 -45.3 -44.6 -45.4 73 -99 SPO 1997 10 09 21 34 30 9.9 -9 682.00 -45.3 -44.6 -45.4 73 -99 SPO 1997 10 09 21 35 30 10.2 -9 682.10 -45.3 -44.6 -45.4 74 -99 SPO 1997 10 09 21 36 29 10.1 -9 682.10 -45.3 -44.6 -45.4 74 -99 SPO 1997 10 09 21 37 29 10.2 -9 682.10 -45.3 -44.5 -45.4 74 -99 SPO 1997 10 09 21 38 30 10.2 -9 682.10 -45.2 -44.5 -45.3 74 -99 SPO 1997 10 09 21 39 30 9.6 -9 682.10 -45.3 -44.6 -45.4 77 -99 SPO 1997 10 09 21 40 30 10.2 -9 682.10 -45.3 -44.6 -45.3 75 -99 SPO 1997 10 09 21 41 30 10.0 -9 682.10 -45.3 -44.6 -45.3 75 -99 SPO 1997 10 09 21 42 30 9.8 -9 682.10 -45.3 -44.6 -45.4 75 -99 SPO 1997 10 09 21 43 31 9.8 -9 682.10 -45.3 -44.6 -45.3 75 -99 SPO 1997 10 09 21 44 30 9.7 -9 682.10 -45.3 -44.6 -45.4 74 -99 SPO 1997 10 09 21 45 31 9.8 -9 682.10 -45.3 -44.6 -45.4 73 -99 SPO 1997 10 09 21 46 30 10.1 -9 682.10 -45.3 -44.7 -45.4 73 -99 SPO 1997 10 09 21 47 31 9.8 -9 682.10 -45.3 -44.6 -45.3 73 -99 SPO 1997 10 09 21 48 31 10.1 -9 682.10 -45.2 -44.6 -45.3 73 -99 SPO 1997 10 09 21 49 31 10.0 -9 682.10 -45.2 -44.5 -45.3 74 -99 SPO 1997 10 09 21 50 30 9.8 -9 682.10 -45.2 -44.5 -45.3 74 -99 SPO 1997 10 09 21 51 29 9.4 -9 682.10 -45.2 -44.5 -45.3 76 -99 SPO 1997 10 09 21 52 29 9.7 -9 682.10 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 21 53 29 9.6 -9 682.00 -45.2 -44.5 -45.3 76 -99 SPO 1997 10 09 21 54 29 9.6 -9 682.00 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 21 55 28 9.8 -9 682.00 -45.1 -44.4 -45.2 76 -99 SPO 1997 10 09 21 56 28 9.8 -9 682.00 -45.2 -44.4 -45.2 76 -99 SPO 1997 10 09 21 57 28 10.2 -9 682.00 -45.1 -44.3 -45.1 75 -99 SPO 1997 10 09 21 58 28 9.9 -9 682.00 -45.0 -44.3 -45.1 74 -99 SPO 1997 10 09 21 59 28 9.9 -9 682.00 -45.0 -44.4 -45.0 74 -99 SPO 1997 10 09 22 00 28 10.0 -9 682.00 -45.1 -44.4 -45.1 76 0 SPO 1997 10 09 22 01 27 9.7 -9 682.00 -45.1 -44.4 -45.1 77 -99 SPO 1997 10 09 22 02 28 9.9 -9 682.00 -45.2 -44.4 -45.2 78 -99 SPO 1997 10 09 22 03 28 10.2 -9 682.00 -45.1 -44.3 -45.1 77 -99 SPO 1997 10 09 22 04 29 10.1 -9 682.00 -45.1 -44.4 -45.0 77 -99 SPO 1997 10 09 22 05 29 10.2 -9 682.00 -45.1 -44.3 -45.0 78 -99 SPO 1997 10 09 22 06 31 10.2 -9 682.00 -45.1 -44.3 -45.1 78 -99 SPO 1997 10 09 22 07 32 10.2 -9 682.00 -45.1 -44.3 -45.1 79 -99 SPO 1997 10 09 22 08 32 10.4 -9 682.00 -45.1 -44.2 -45.1 78 -99 SPO 1997 10 09 22 09 34 10.2 -9 682.00 -45.1 -44.2 -45.1 77 -99 SPO 1997 10 09 22 10 32 9.7 -9 682.00 -45.2 -44.3 -45.1 77 -99 SPO 1997 10 09 22 11 33 9.7 -9 682.10 -45.3 -44.4 -45.2 78 -99 SPO 1997 10 09 22 12 35 9.6 -9 682.10 -45.3 -44.4 -45.3 78 -99 SPO 1997 10 09 22 13 33 9.2 -9 682.10 -45.3 -44.5 -45.3 78 -99 SPO 1997 10 09 22 14 34 9.2 -9 682.10 -45.4 -44.6 -45.4 79 -99 SPO 1997 10 09 22 15 35 9.4 -9 682.10 -45.4 -44.6 -45.3 78 -99 SPO 1997 10 09 22 16 35 9.5 -9 682.10 -45.4 -44.6 -45.4 76 -99 SPO 1997 10 09 22 17 36 9.6 -9 682.10 -45.5 -44.6 -45.4 77 -99 SPO 1997 10 09 22 18 36 9.4 -9 682.10 -45.4 -44.6 -45.4 76 -99 SPO 1997 10 09 22 19 36 9.7 -9 682.00 -45.5 -44.7 -45.4 76 -99 SPO 1997 10 09 22 20 36 9.4 -9 682.10 -45.5 -44.7 -45.4 75 -99 SPO 1997 10 09 22 21 36 9.8 -9 682.10 -45.4 -44.7 -45.4 73 -99 SPO 1997 10 09 22 22 36 9.9 -9 682.10 -45.4 -44.6 -45.3 73 -99 SPO 1997 10 09 22 23 37 10.0 -9 682.10 -45.5 -44.6 -45.4 73 -99 SPO 1997 10 09 22 24 36 10.3 -9 682.10 -45.4 -44.6 -45.4 73 -99 SPO 1997 10 09 22 25 36 10.0 -9 682.10 -45.4 -44.5 -45.4 74 -99 SPO 1997 10 09 22 26 35 9.8 -9 682.10 -45.5 -44.5 -45.4 76 -99 SPO 1997 10 09 22 27 34 10.1 -9 682.10 -45.4 -44.5 -45.3 76 -99 SPO 1997 10 09 22 28 35 10.1 -9 682.10 -45.4 -44.4 -45.2 76 -99 SPO 1997 10 09 22 29 34 9.7 -9 682.10 -45.4 -44.5 -45.3 76 -99 SPO 1997 10 09 22 30 34 9.4 -9 682.10 -45.4 -44.4 -45.3 76 -99 SPO 1997 10 09 22 31 33 9.3 -9 682.10 -45.4 -44.4 -45.3 76 -99 SPO 1997 10 09 22 32 33 9.2 -9 682.20 -45.4 -44.4 -45.3 76 -99 SPO 1997 10 09 22 33 33 9.0 -9 682.20 -45.4 -44.5 -45.3 74 -99 SPO 1997 10 09 22 34 32 9.5 -9 682.20 -45.4 -44.5 -45.3 75 -99 SPO 1997 10 09 22 35 31 9.3 -9 682.20 -45.4 -44.5 -45.3 74 -99 SPO 1997 10 09 22 36 31 9.4 -9 682.20 -45.3 -44.5 -45.2 73 -99 SPO 1997 10 09 22 37 32 9.6 -9 682.10 -45.2 -44.5 -45.1 74 -99 SPO 1997 10 09 22 38 30 9.2 -9 682.10 -45.2 -44.5 -45.2 76 -99 SPO 1997 10 09 22 39 32 9.5 -9 682.20 -45.3 -44.5 -45.2 77 -99 SPO 1997 10 09 22 40 32 9.3 -9 682.20 -45.4 -44.4 -45.3 78 -99 SPO 1997 10 09 22 41 32 9.3 -9 682.20 -45.4 -44.5 -45.4 78 -99 SPO 1997 10 09 22 42 32 9.3 -9 682.20 -45.4 -44.5 -45.3 78 -99 SPO 1997 10 09 22 43 32 9.0 -9 682.20 -45.3 -44.5 -45.3 75 -99 SPO 1997 10 09 22 44 32 8.9 -9 682.20 -45.4 -44.6 -45.3 76 -99 SPO 1997 10 09 22 45 29 9.2 -9 682.20 -45.4 -44.6 -45.4 75 -99 SPO 1997 10 09 22 46 32 9.4 -9 682.20 -45.4 -44.5 -45.4 74 -99 SPO 1997 10 09 22 47 31 9.5 -9 682.10 -45.4 -44.5 -45.4 74 -99 SPO 1997 10 09 22 48 30 9.2 -9 682.10 -45.4 -44.5 -45.4 73 -99 SPO 1997 10 09 22 49 33 9.7 -9 682.10 -45.4 -44.5 -45.4 73 -99 SPO 1997 10 09 22 50 34 9.7 -9 682.10 -45.5 -44.4 -45.4 74 -99 SPO 1997 10 09 22 51 33 9.9 -9 682.10 -45.5 -44.4 -45.4 74 -99 SPO 1997 10 09 22 52 33 10.2 -9 682.00 -45.5 -44.4 -45.4 75 -99 SPO 1997 10 09 22 53 32 10.4 -9 682.00 -45.4 -44.4 -45.4 74 -99 SPO 1997 10 09 22 54 32 10.3 -9 682.00 -45.4 -44.3 -45.3 75 -99 SPO 1997 10 09 22 55 31 10.2 -9 682.00 -45.4 -44.3 -45.3 75 -99 SPO 1997 10 09 22 56 32 9.9 -9 682.00 -45.4 -44.3 -45.3 76 -99 SPO 1997 10 09 22 57 30 9.7 -9 682.10 -45.3 -44.3 -45.2 75 -99 SPO 1997 10 09 22 58 30 9.8 -9 682.10 -45.3 -44.3 -45.2 75 -99 SPO 1997 10 09 22 59 31 9.9 -9 682.10 -45.3 -44.3 -45.3 74 -99 SPO 1997 10 09 23 00 29 10.1 -9 682.10 -45.2 -44.2 -45.2 73 0 SPO 1997 10 09 23 01 30 10.0 -9 682.10 -45.2 -44.2 -45.2 73 -99 SPO 1997 10 09 23 02 29 9.9 -9 682.10 -45.3 -44.2 -45.2 75 -99 SPO 1997 10 09 23 03 30 10.3 -9 682.10 -45.2 -44.2 -45.2 76 -99 SPO 1997 10 09 23 04 30 10.1 -9 682.10 -45.2 -44.1 -45.2 76 -99 SPO 1997 10 09 23 05 30 10.0 -9 682.10 -45.1 -44.1 -45.2 76 -99 SPO 1997 10 09 23 06 30 9.8 -9 682.10 -45.2 -44.2 -45.2 77 -99 SPO 1997 10 09 23 07 29 9.8 -9 682.10 -45.1 -44.2 -45.2 76 -99 SPO 1997 10 09 23 08 29 9.5 -9 682.10 -45.2 -44.2 -45.2 77 -99 SPO 1997 10 09 23 09 32 10.3 -9 682.10 -45.2 -44.2 -45.2 77 -99 SPO 1997 10 09 23 10 31 10.4 -9 682.00 -45.1 -44.1 -45.1 76 -99 SPO 1997 10 09 23 11 30 10.4 -9 682.00 -45.1 -44.2 -45.2 75 -99 SPO 1997 10 09 23 12 32 10.7 -9 682.10 -45.1 -44.2 -45.1 75 -99 SPO 1997 10 09 23 13 32 10.4 -9 682.00 -45.0 -44.1 -45.1 74 -99 SPO 1997 10 09 23 14 32 10.4 -9 682.10 -45.2 -44.2 -45.2 76 -99 SPO 1997 10 09 23 15 32 11.1 -9 682.00 -45.1 -44.1 -45.0 75 -99 SPO 1997 10 09 23 16 32 10.9 -9 682.00 -45.1 -44.1 -45.1 75 -99 SPO 1997 10 09 23 17 33 11.2 -9 682.00 -45.1 -44.0 -45.1 76 -99 SPO 1997 10 09 23 18 33 10.6 -9 682.10 -45.1 -44.0 -45.1 76 -99 SPO 1997 10 09 23 19 32 10.6 -9 682.00 -45.1 -44.0 -45.1 76 -99 SPO 1997 10 09 23 20 33 10.7 -9 682.10 -45.1 -44.0 -45.1 76 -99 SPO 1997 10 09 23 21 33 10.2 -9 682.10 -45.1 -44.0 -45.0 76 -99 SPO 1997 10 09 23 22 34 10.2 -9 682.10 -45.1 -44.1 -45.1 76 -99 SPO 1997 10 09 23 23 34 10.2 -9 682.10 -45.1 -44.1 -45.1 76 -99 SPO 1997 10 09 23 24 35 10.1 -9 682.20 -45.1 -44.0 -45.1 75 -99 SPO 1997 10 09 23 25 35 10.1 -9 682.20 -45.1 -44.0 -45.1 74 -99 SPO 1997 10 09 23 26 34 9.6 -9 682.20 -45.1 -44.0 -45.1 74 -99 SPO 1997 10 09 23 27 35 9.5 -9 682.20 -45.1 -44.1 -45.0 75 -99 SPO 1997 10 09 23 28 36 9.6 -9 682.20 -45.1 -44.2 -45.0 76 -99 SPO 1997 10 09 23 29 35 9.1 -9 682.30 -45.2 -44.2 -45.1 77 -99 SPO 1997 10 09 23 30 37 8.7 -9 682.30 -45.4 -44.4 -45.3 79 -99 SPO 1997 10 09 23 31 38 8.5 -9 682.30 -45.4 -44.4 -45.4 79 -99 SPO 1997 10 09 23 32 38 8.3 -9 682.30 -45.4 -44.5 -45.4 79 -99 SPO 1997 10 09 23 33 38 8.5 -9 682.30 -45.5 -44.5 -45.4 79 -99 SPO 1997 10 09 23 34 38 8.6 -9 682.40 -45.4 -44.4 -45.3 76 -99 SPO 1997 10 09 23 35 39 8.3 -9 682.40 -45.4 -44.4 -45.3 75 -99 SPO 1997 10 09 23 36 39 8.5 -9 682.30 -45.4 -44.4 -45.3 74 -99 SPO 1997 10 09 23 37 39 8.8 -9 682.30 -45.4 -44.4 -45.2 73 -99 SPO 1997 10 09 23 38 39 8.8 -9 682.30 -45.3 -44.3 -45.2 73 -99 SPO 1997 10 09 23 39 39 9.2 -9 682.30 -45.3 -44.3 -45.2 73 -99 SPO 1997 10 09 23 40 44 9.4 -9 682.20 -45.3 -44.1 -45.2 73 -99 SPO 1997 10 09 23 41 34 9.0 -9 682.20 -45.3 -44.1 -45.1 75 -99 SPO 1997 10 09 23 42 40 9.3 -9 682.30 -45.3 -44.2 -45.2 77 -99 SPO 1997 10 09 23 43 37 8.9 -9 682.20 -45.2 -44.0 -45.0 76 -99 SPO 1997 10 09 23 44 37 8.8 -9 682.20 -45.3 -44.2 -45.2 77 -99 SPO 1997 10 09 23 45 38 9.5 -9 682.10 -45.2 -44.0 -45.1 77 -99 SPO 1997 10 09 23 46 37 9.4 -9 682.10 -45.2 -44.1 -45.0 78 -99 SPO 1997 10 09 23 47 37 9.1 -9 682.10 -45.2 -44.1 -45.1 78 -99 SPO 1997 10 09 23 48 37 9.5 -9 682.10 -45.2 -44.1 -45.0 78 -99 SPO 1997 10 09 23 49 37 9.3 -9 682.10 -45.1 -44.1 -45.0 76 -99 SPO 1997 10 09 23 50 37 9.7 -9 682.10 -45.1 -44.0 -45.0 76 -99 SPO 1997 10 09 23 51 37 9.3 -9 682.10 -45.2 -44.0 -45.0 77 -99 SPO 1997 10 09 23 52 37 9.9 -9 682.10 -45.1 -43.9 -44.9 77 -99 SPO 1997 10 09 23 53 36 9.8 -9 682.10 -45.0 -43.7 -44.8 76 -99 SPO 1997 10 09 23 54 36 9.8 -9 682.10 -44.9 -43.7 -44.7 76 -99 SPO 1997 10 09 23 55 37 9.3 -9 682.10 -44.9 -43.7 -44.8 77 -99 SPO 1997 10 09 23 56 34 9.4 -9 682.10 -44.9 -43.7 -44.8 77 -99 SPO 1997 10 09 23 57 33 9.3 -9 682.10 -44.8 -43.6 -44.6 76 -99 SPO 1997 10 09 23 58 32 9.6 -9 682.10 -44.8 -43.6 -44.6 -99 -99 SPO 1997 10 09 23 59 31 9.9 -9 682.10 -44.6 -43.5 -44.4 -99 -99 SPO 1997 10 10 00 00 30 9.0 -9 682.10 -44.6 -43.2 -44.5 -99 0 SPO 1997 10 10 00 01 31 9.6 -9 682.00 -44.6 -43.4 -44.5 -99 -99 SPO 1997 10 10 00 02 30 9.5 -9 682.00 -44.6 -43.5 -44.4 -99 -99 SPO 1997 10 10 00 03 29 9.7 -9 682.00 -44.5 -43.5 -44.4 75 -99 SPO 1997 10 10 00 04 29 9.4 -9 682.00 -44.6 -43.6 -44.5 77 -99 SPO 1997 10 10 00 05 30 9.4 -9 682.00 -44.6 -43.6 -44.5 79 -99 SPO 1997 10 10 00 06 30 9.2 -9 682.00 -44.6 -43.6 -44.6 79 -99 SPO 1997 10 10 00 07 30 9.3 -9 682.00 -44.6 -43.6 -44.5 79 -99 SPO 1997 10 10 00 08 32 9.3 -9 682.00 -44.6 -43.6 -44.6 78 -99 SPO 1997 10 10 00 09 33 9.5 -9 682.00 -44.6 -43.6 -44.5 78 -99 SPO 1997 10 10 00 10 33 9.8 -9 682.00 -44.6 -43.5 -44.5 77 -99 SPO 1997 10 10 00 11 32 10.0 -9 682.00 -44.6 -43.4 -44.4 77 -99 SPO 1997 10 10 00 12 33 10.0 -9 682.00 -44.5 -43.3 -44.4 76 -99 SPO 1997 10 10 00 13 33 9.6 -9 682.00 -44.5 -43.3 -44.3 76 -99 SPO 1997 10 10 00 14 34 9.7 -9 682.00 -44.5 -43.3 -44.3 75 -99 SPO 1997 10 10 00 15 33 9.8 -9 682.00 -44.4 -43.2 -44.2 74 -99 SPO 1997 10 10 00 16 31 9.9 -9 682.00 -44.2 -43.0 -44.1 73 -99 SPO 1997 10 10 00 17 32 9.8 -9 682.00 -44.2 -43.1 -44.0 74 -99 SPO 1997 10 10 00 18 33 9.3 -9 682.00 -44.2 -43.2 -44.1 75 -99 SPO 1997 10 10 00 19 34 9.6 -9 682.00 -44.3 -43.2 -44.2 75 -99 SPO 1997 10 10 00 20 35 9.2 -9 682.00 -44.4 -43.3 -44.2 77 -99 SPO 1997 10 10 00 21 35 8.8 -9 682.00 -44.4 -43.4 -44.3 78 -99 SPO 1997 10 10 00 22 34 9.3 -9 682.10 -44.4 -43.3 -44.3 78 -99 SPO 1997 10 10 00 23 33 9.1 -9 682.10 -44.3 -43.2 -44.2 76 -99 SPO 1997 10 10 00 24 33 8.8 -9 682.10 -44.2 -43.2 -44.0 76 -99 SPO 1997 10 10 00 25 33 9.1 -9 682.10 -44.1 -43.2 -44.0 75 -99 SPO 1997 10 10 00 26 32 9.2 -9 682.20 -44.1 -43.2 -44.0 75 -99 SPO 1997 10 10 00 27 30 9.3 -9 682.20 -44.0 -43.2 -43.9 74 -99 SPO 1997 10 10 00 28 32 8.9 -9 682.20 -43.8 -43.1 -43.8 72 -99 SPO 1997 10 10 00 29 32 9.0 -9 682.20 -43.8 -43.0 -43.8 74 -99 SPO 1997 10 10 00 30 34 9.2 -9 682.20 -43.9 -43.0 -43.8 75 -99 SPO 1997 10 10 00 31 34 8.9 -9 682.20 -43.9 -43.1 -43.9 75 -99 SPO 1997 10 10 00 32 34 9.1 -9 682.20 -44.0 -43.0 -43.9 76 -99 SPO 1997 10 10 00 33 33 8.8 -9 682.20 -43.9 -43.0 -43.9 75 -99 SPO 1997 10 10 00 34 36 8.5 -9 682.30 -44.0 -43.0 -43.9 76 -99 SPO 1997 10 10 00 35 35 8.7 -9 682.30 -44.0 -43.1 -44.0 76 -99 SPO 1997 10 10 00 36 35 8.4 -9 682.30 -44.0 -43.1 -44.0 76 -99 SPO 1997 10 10 00 37 36 8.0 -9 682.30 -44.0 -43.1 -44.0 75 -99 SPO 1997 10 10 00 38 36 8.1 -9 682.30 -44.1 -43.2 -44.1 76 -99 SPO 1997 10 10 00 39 35 8.4 -9 682.30 -44.1 -43.2 -44.1 76 -99 SPO 1997 10 10 00 40 34 8.3 -9 682.30 -44.0 -43.1 -44.0 75 -99 SPO 1997 10 10 00 41 33 8.9 -9 682.30 -44.0 -43.0 -44.0 74 -99 SPO 1997 10 10 00 42 34 8.5 -9 682.30 -43.7 -43.0 -43.8 71 -99 SPO 1997 10 10 00 43 35 8.0 -9 682.30 -43.9 -43.1 -44.0 75 -99 SPO 1997 10 10 00 44 37 7.8 -9 682.30 -44.1 -43.2 -44.1 77 -99 SPO 1997 10 10 00 45 38 7.5 -9 682.30 -44.2 -43.4 -44.2 78 -99 SPO 1997 10 10 00 46 39 7.4 -9 682.30 -44.3 -43.4 -44.2 79 -99 SPO 1997 10 10 00 47 38 8.2 -9 682.30 -44.3 -43.3 -44.2 79 -99 SPO 1997 10 10 00 48 37 8.6 -9 682.30 -44.2 -43.2 -44.1 77 -99 SPO 1997 10 10 00 49 37 8.6 -9 682.20 -44.2 -43.1 -44.1 76 -99 SPO 1997 10 10 00 50 35 8.1 -9 682.30 -44.2 -43.2 -44.1 76 -99 SPO 1997 10 10 00 51 35 8.1 -9 682.30 -44.3 -43.3 -44.1 77 -99 SPO 1997 10 10 00 52 34 9.5 -9 682.20 -44.1 -43.0 -44.0 75 -99 SPO 1997 10 10 00 53 33 9.3 -9 682.20 -43.9 -42.8 -43.8 73 -99 SPO 1997 10 10 00 54 31 9.8 -9 682.20 -43.8 -42.6 -43.7 72 -99 SPO 1997 10 10 00 55 30 10.6 -9 682.10 -43.7 -42.6 -43.6 71 -99 SPO 1997 10 10 00 56 30 9.8 -9 682.10 -43.5 -42.5 -43.4 71 -99 SPO 1997 10 10 00 57 32 9.8 -9 682.10 -43.6 -42.6 -43.6 74 -99 SPO 1997 10 10 00 58 32 9.4 -9 682.10 -43.7 -42.8 -43.7 76 -99 SPO 1997 10 10 00 59 31 9.3 -9 682.10 -43.9 -42.9 -43.9 78 -99 SPO 1997 10 10 01 00 27 8.0 -9 682.10 -43.9 -43.1 -43.9 78 0 SPO 1997 10 10 01 01 31 9.7 -9 682.10 -43.9 -43.0 -43.8 76 -99 SPO 1997 10 10 01 02 32 9.5 -9 682.10 -43.7 -42.8 -43.6 75 -99 SPO 1997 10 10 01 03 31 9.5 -9 682.10 -43.8 -42.7 -43.8 75 -99 SPO 1997 10 10 01 04 30 9.1 -9 682.10 -44.0 -42.8 -43.9 77 -99 SPO 1997 10 10 01 05 29 8.8 -9 682.10 -44.0 -42.8 -43.9 77 -99 SPO 1997 10 10 01 06 31 9.1 -9 682.10 -44.0 -42.8 -43.8 76 -99 SPO 1997 10 10 01 07 31 8.9 -9 682.10 -43.9 -42.8 -43.8 75 -99 SPO 1997 10 10 01 08 31 8.6 -9 682.10 -43.9 -42.8 -43.8 75 -99 SPO 1997 10 10 01 09 32 8.3 -9 682.10 -44.0 -42.9 -43.9 76 -99 SPO 1997 10 10 01 10 33 8.5 -9 682.10 -44.1 -43.0 -44.0 77 -99 SPO 1997 10 10 01 11 34 8.3 -9 682.10 -44.1 -42.8 -43.9 77 -99 SPO 1997 10 10 01 12 33 8.4 -9 682.10 -44.1 -42.9 -43.9 76 -99 SPO 1997 10 10 01 13 33 8.4 -9 682.10 -44.1 -42.8 -43.9 75 -99 SPO 1997 10 10 01 14 32 8.5 -9 682.10 -44.1 -43.0 -43.9 75 -99 SPO 1997 10 10 01 15 33 8.3 -9 682.10 -44.1 -42.8 -43.9 75 -99 SPO 1997 10 10 01 16 31 8.4 -9 682.10 -44.1 -42.8 -43.9 75 -99 SPO 1997 10 10 01 17 31 8.2 -9 682.10 -44.1 -42.9 -43.8 75 -99 SPO 1997 10 10 01 18 31 8.5 -9 682.10 -44.0 -42.8 -43.8 75 -99 SPO 1997 10 10 01 19 32 8.4 -9 682.10 -44.0 -42.8 -44.0 74 -99 SPO 1997 10 10 01 20 32 8.5 -9 682.10 -44.1 -42.8 -44.0 75 -99 SPO 1997 10 10 01 21 30 8.6 -9 682.10 -44.0 -42.8 -43.9 73 -99 SPO 1997 10 10 01 22 30 8.8 -9 682.10 -44.0 -42.7 -43.9 74 -99 SPO 1997 10 10 01 23 31 9.1 -9 682.10 -43.9 -42.5 -43.8 74 -99 SPO 1997 10 10 01 24 30 9.2 -9 682.10 -43.8 -42.4 -43.7 73 -99 SPO 1997 10 10 01 25 29 8.8 -9 682.10 -43.8 -42.4 -43.7 74 -99 SPO 1997 10 10 01 26 29 9.4 -9 682.10 -43.7 -42.4 -43.6 74 -99 SPO 1997 10 10 01 27 29 9.1 -9 682.10 -43.6 -42.4 -43.6 74 -99 SPO 1997 10 10 01 28 30 8.7 -9 682.10 -43.7 -42.4 -43.7 75 -99 SPO 1997 10 10 01 29 30 8.9 -9 682.00 -43.7 -42.4 -43.6 75 -99 SPO 1997 10 10 01 30 30 8.9 -9 682.00 -43.7 -42.3 -43.7 75 -99 SPO 1997 10 10 01 31 30 9.0 -9 682.00 -43.8 -42.2 -43.8 74 -99 SPO 1997 10 10 01 32 29 9.2 -9 682.00 -43.6 -42.2 -43.6 71 -99 SPO 1997 10 10 01 33 28 9.3 -9 682.00 -43.6 -42.1 -43.5 71 -99 SPO 1997 10 10 01 34 28 9.3 -9 682.00 -43.4 -42.1 -43.4 71 -99 SPO 1997 10 10 01 35 28 9.2 -9 682.00 -43.4 -42.1 -43.3 71 -99 SPO 1997 10 10 01 36 29 9.3 -9 682.10 -43.4 -42.0 -43.3 72 -99 SPO 1997 10 10 01 37 28 9.2 -9 682.00 -43.3 -42.0 -43.2 73 -99 SPO 1997 10 10 01 38 29 9.2 -9 682.00 -43.3 -42.0 -43.2 74 -99 SPO 1997 10 10 01 39 28 9.4 -9 682.00 -43.2 -41.9 -43.0 73 -99 SPO 1997 10 10 01 40 29 9.3 -9 682.10 -43.2 -41.8 -43.0 74 -99 SPO 1997 10 10 01 41 30 9.0 -9 682.10 -43.2 -41.9 -43.1 74 -99 SPO 1997 10 10 01 42 30 8.8 -9 682.10 -43.1 -42.0 -43.1 74 -99 SPO 1997 10 10 01 43 31 8.7 -9 682.10 -43.1 -42.0 -43.1 74 -99 SPO 1997 10 10 01 44 31 8.8 -9 682.10 -43.1 -42.0 -43.1 73 -99 SPO 1997 10 10 01 45 30 8.8 -9 682.10 -43.1 -42.0 -43.1 73 -99 SPO 1997 10 10 01 46 30 8.8 -9 682.10 -43.1 -42.0 -43.1 73 -99 SPO 1997 10 10 01 47 30 8.9 -9 682.00 -43.1 -41.9 -43.1 73 -99 SPO 1997 10 10 01 48 29 9.5 -9 682.00 -43.0 -41.9 -42.9 73 -99 SPO 1997 10 10 01 49 29 9.7 -9 682.00 -42.8 -41.7 -42.8 72 -99 SPO 1997 10 10 01 50 28 9.4 -9 682.00 -42.8 -41.8 -42.8 72 -99 SPO 1997 10 10 01 51 29 9.4 -9 682.00 -42.7 -41.8 -42.8 74 -99 SPO 1997 10 10 01 52 29 9.3 -9 682.00 -42.8 -41.9 -42.8 75 -99 SPO 1997 10 10 01 53 28 9.6 -9 681.90 -42.8 -41.8 -42.7 75 -99 SPO 1997 10 10 01 54 26 9.7 -9 681.90 -42.8 -41.8 -42.8 75 -99 SPO 1997 10 10 01 55 27 9.5 -9 681.90 -42.7 -41.8 -42.7 75 -99 SPO 1997 10 10 01 56 29 9.6 -9 681.90 -42.8 -41.9 -42.8 76 -99 SPO 1997 10 10 01 57 28 9.2 -9 681.90 -42.9 -41.9 -43.0 76 -99 SPO 1997 10 10 01 58 28 9.3 -9 681.90 -43.0 -42.0 -43.0 76 -99 SPO 1997 10 10 01 59 31 9.6 -9 681.80 -43.1 -41.7 -43.1 77 -99 SPO 1997 10 10 02 00 27 9.7 -9 681.80 -43.0 -41.9 -43.1 74 0 SPO 1997 10 10 02 01 27 9.5 -9 681.80 -43.0 -42.0 -43.0 74 -99 SPO 1997 10 10 02 02 27 9.8 -9 681.80 -43.0 -41.8 -43.0 74 -99 SPO 1997 10 10 02 03 26 10.5 -9 681.80 -42.9 -41.7 -42.8 75 -99 SPO 1997 10 10 02 04 27 10.7 -9 681.80 -42.7 -41.6 -42.6 74 -99 SPO 1997 10 10 02 05 27 10.1 -9 681.80 -42.7 -41.6 -42.8 75 -99 SPO 1997 10 10 02 06 26 10.6 -9 681.70 -42.6 -41.6 -42.7 75 -99 SPO 1997 10 10 02 07 26 10.3 -9 681.70 -42.7 -41.8 -42.8 76 -99 SPO 1997 10 10 02 08 31 11.6 -9 681.60 -42.8 -41.4 -42.8 77 -99 SPO 1997 10 10 02 09 28 10.8 -9 681.60 -42.6 -41.4 -42.6 76 -99 SPO 1997 10 10 02 10 26 11.0 -9 681.60 -42.8 -41.5 -42.8 78 -99 SPO 1997 10 10 02 11 27 10.9 -9 681.60 -42.8 -41.6 -42.8 78 -99 SPO 1997 10 10 02 12 27 11.0 -9 681.60 -42.6 -41.4 -42.6 76 -99 SPO 1997 10 10 02 13 28 11.3 -9 681.60 -42.5 -41.4 -42.5 75 -99 SPO 1997 10 10 02 14 27 10.9 -9 681.60 -42.5 -41.4 -42.6 76 -99 SPO 1997 10 10 02 15 30 11.3 -9 681.60 -42.6 -41.4 -42.7 76 -99 SPO 1997 10 10 02 16 28 11.0 -9 681.60 -42.5 -41.3 -42.4 77 -99 SPO 1997 10 10 02 17 27 10.3 -9 681.60 -42.7 -41.7 -42.8 78 -99 SPO 1997 10 10 02 18 30 10.7 -9 681.60 -42.8 -41.5 -42.9 78 -99 SPO 1997 10 10 02 19 29 10.5 -9 681.60 -42.7 -41.4 -42.7 76 -99 SPO 1997 10 10 02 20 28 10.4 -9 681.60 -42.6 -41.5 -42.7 76 -99 SPO 1997 10 10 02 21 29 10.8 -9 681.60 -42.7 -41.6 -42.8 76 -99 SPO 1997 10 10 02 22 29 10.6 -9 681.60 -42.7 -41.4 -42.7 76 -99 SPO 1997 10 10 02 23 29 10.9 -9 681.60 -42.6 -41.4 -42.6 76 -99 SPO 1997 10 10 02 24 30 10.6 -9 681.70 -42.6 -41.4 -42.6 75 -99 SPO 1997 10 10 02 25 30 10.7 -9 681.60 -42.6 -41.4 -42.6 74 -99 SPO 1997 10 10 02 26 30 10.6 -9 681.70 -42.6 -41.5 -42.6 75 -99 SPO 1997 10 10 02 27 30 10.6 -9 681.70 -42.6 -41.5 -42.6 75 -99 SPO 1997 10 10 02 28 31 10.5 -9 681.70 -42.6 -41.6 -42.7 76 -99 SPO 1997 10 10 02 29 31 10.8 -9 681.70 -42.6 -41.5 -42.6 76 -99 SPO 1997 10 10 02 30 30 10.3 -9 681.80 -42.6 -41.5 -42.6 76 -99 SPO 1997 10 10 02 31 30 10.3 -9 681.80 -42.6 -41.5 -42.7 76 -99 SPO 1997 10 10 02 32 30 10.4 -9 681.80 -42.6 -41.6 -42.6 76 -99 SPO 1997 10 10 02 33 31 10.3 -9 681.80 -42.6 -41.6 -42.6 76 -99 SPO 1997 10 10 02 34 31 10.4 -9 681.80 -42.6 -41.5 -42.6 76 -99 SPO 1997 10 10 02 35 30 10.2 -9 681.80 -42.6 -41.5 -42.6 76 -99 SPO 1997 10 10 02 36 31 10.2 -9 681.80 -42.6 -41.5 -42.6 75 -99 SPO 1997 10 10 02 37 31 9.8 -9 681.80 -42.6 -41.6 -42.7 75 -99 SPO 1997 10 10 02 38 31 10.0 -9 681.80 -42.6 -41.6 -42.6 75 -99 SPO 1997 10 10 02 39 31 9.9 -9 681.80 -42.5 -41.5 -42.6 73 -99 SPO 1997 10 10 02 40 32 9.7 -9 681.80 -42.5 -41.5 -42.6 74 -99 SPO 1997 10 10 02 41 32 9.7 -9 681.80 -42.6 -41.5 -42.6 75 -99 SPO 1997 10 10 02 42 33 9.7 -9 681.80 -42.5 -41.5 -42.6 75 -99 SPO 1997 10 10 02 43 33 9.6 -9 681.80 -42.5 -41.5 -42.6 75 -99 SPO 1997 10 10 02 44 33 9.6 -9 681.80 -42.5 -41.5 -42.5 75 -99 SPO 1997 10 10 02 45 33 9.4 -9 681.90 -42.4 -41.5 -42.5 74 -99 SPO 1997 10 10 02 46 34 9.4 -9 681.90 -42.5 -41.5 -42.5 76 -99 SPO 1997 10 10 02 47 34 9.1 -9 681.80 -42.5 -41.5 -42.5 76 -99 SPO 1997 10 10 02 48 34 9.4 -9 681.80 -42.4 -41.5 -42.4 75 -99 SPO 1997 10 10 02 49 34 9.4 -9 681.90 -42.4 -41.5 -42.4 74 -99 SPO 1997 10 10 02 50 34 9.6 -9 681.90 -42.3 -41.5 -42.3 74 -99 SPO 1997 10 10 02 51 35 9.3 -9 681.90 -42.3 -41.4 -42.4 74 -99 SPO 1997 10 10 02 52 35 9.2 -9 681.90 -42.4 -41.4 -42.4 76 -99 SPO 1997 10 10 02 53 35 8.9 -9 681.90 -42.3 -41.4 -42.3 76 -99 SPO 1997 10 10 02 54 36 9.3 -9 681.90 -42.3 -41.4 -42.3 77 -99 SPO 1997 10 10 02 55 35 9.2 -9 681.90 -42.2 -41.3 -42.2 77 -99 SPO 1997 10 10 02 56 35 9.4 -9 681.90 -42.2 -41.3 -42.2 77 -99 SPO 1997 10 10 02 57 34 9.2 -9 681.80 -42.2 -41.3 -42.2 77 -99 SPO 1997 10 10 02 58 34 9.4 -9 681.90 -42.1 -41.2 -42.2 76 -99 SPO 1997 10 10 02 59 35 9.4 -9 681.80 -42.0 -41.2 -42.1 75 -99 SPO 1997 10 10 03 00 35 9.4 -9 681.80 -42.1 -41.2 -42.1 76 0 SPO 1997 10 10 03 01 35 9.3 -9 681.80 -42.1 -41.1 -42.2 76 -99 SPO 1997 10 10 03 02 34 9.2 -9 681.80 -42.1 -41.2 -42.1 75 -99 SPO 1997 10 10 03 03 35 9.5 -9 681.80 -42.1 -41.2 -42.1 75 -99 SPO 1997 10 10 03 04 35 9.5 -9 681.80 -42.1 -41.2 -42.1 75 -99 SPO 1997 10 10 03 05 35 9.4 -9 681.80 -42.1 -41.2 -42.1 75 -99 SPO 1997 10 10 03 06 35 9.6 -9 681.80 -42.1 -41.2 -42.1 76 -99 SPO 1997 10 10 03 07 34 9.5 -9 681.80 -42.1 -41.2 -42.1 77 -99 SPO 1997 10 10 03 08 34 9.9 -9 681.80 -42.0 -41.1 -42.1 76 -99 SPO 1997 10 10 03 09 33 9.7 -9 681.80 -42.0 -41.1 -42.0 76 -99 SPO 1997 10 10 03 10 34 9.8 -9 681.80 -41.9 -41.0 -41.9 75 -99 SPO 1997 10 10 03 11 34 9.6 -9 681.80 -41.9 -41.0 -42.0 76 -99 SPO 1997 10 10 03 12 32 9.5 -9 681.80 -41.9 -41.0 -41.9 77 -99 SPO 1997 10 10 03 13 32 9.7 -9 681.80 -41.8 -41.0 -41.9 76 -99 SPO 1997 10 10 03 14 32 9.9 -9 681.80 -41.8 -41.0 -41.8 76 -99 SPO 1997 10 10 03 15 32 9.8 -9 681.80 -41.8 -41.0 -41.9 76 -99 SPO 1997 10 10 03 16 31 9.7 -9 681.80 -41.8 -40.9 -41.8 76 -99 SPO 1997 10 10 03 17 31 10.0 -9 681.80 -41.7 -40.9 -41.8 75 -99 SPO 1997 10 10 03 18 31 9.6 -9 681.80 -41.6 -40.9 -41.8 74 -99 SPO 1997 10 10 03 19 31 9.8 -9 681.80 -41.7 -40.9 -41.8 75 -99 SPO 1997 10 10 03 20 30 9.9 -9 681.80 -41.7 -40.8 -41.7 75 -99 SPO 1997 10 10 03 21 30 10.0 -9 681.80 -41.6 -40.8 -41.6 75 -99 SPO 1997 10 10 03 22 29 9.8 -9 681.80 -41.6 -40.9 -41.6 77 -99 SPO 1997 10 10 03 23 29 9.9 -9 681.70 -41.6 -40.8 -41.6 77 -99 SPO 1997 10 10 03 24 30 9.7 -9 681.70 -41.6 -40.9 -41.6 77 -99 SPO 1997 10 10 03 25 30 10.3 -9 681.70 -41.6 -40.9 -41.6 77 -99 SPO 1997 10 10 03 26 29 10.2 -9 681.70 -41.6 -40.9 -41.6 78 -99 SPO 1997 10 10 03 27 30 10.3 -9 681.70 -41.5 -40.8 -41.6 78 -99 SPO 1997 10 10 03 28 31 10.1 -9 681.60 -41.6 -40.9 -41.6 78 -99 SPO 1997 10 10 03 29 31 10.1 -9 681.70 -41.6 -40.9 -41.6 78 -99 SPO 1997 10 10 03 30 30 10.0 -9 681.70 -41.6 -40.9 -41.6 77 -99 SPO 1997 10 10 03 31 30 10.3 -9 681.70 -41.5 -40.9 -41.6 75 -99 SPO 1997 10 10 03 32 31 10.2 -9 681.70 -41.6 -40.9 -41.6 77 -99 SPO 1997 10 10 03 33 29 10.4 -9 681.60 -41.5 -40.9 -41.6 76 -99 SPO 1997 10 10 03 34 30 10.1 -9 681.60 -41.5 -40.9 -41.6 77 -99 SPO 1997 10 10 03 35 30 10.3 -9 681.60 -41.5 -40.9 -41.5 78 -99 SPO 1997 10 10 03 36 30 10.3 -9 681.60 -41.5 -40.9 -41.6 78 -99 SPO 1997 10 10 03 37 32 10.4 -9 681.60 -41.4 -40.8 -41.6 76 -99 SPO 1997 10 10 03 38 31 10.4 -9 681.60 -41.4 -40.8 -41.6 76 -99 SPO 1997 10 10 03 39 31 10.4 -9 681.70 -41.4 -40.8 -41.5 76 -99 SPO 1997 10 10 03 40 31 10.0 -9 681.60 -41.4 -40.9 -41.5 76 -99 SPO 1997 10 10 03 41 30 10.2 -9 681.70 -41.5 -40.9 -41.5 78 -99 SPO 1997 10 10 03 42 30 9.8 -9 681.70 -41.5 -41.0 -41.5 77 -99 SPO 1997 10 10 03 43 30 10.3 -9 681.60 -41.4 -41.0 -41.5 76 -99 SPO 1997 10 10 03 44 29 10.2 -9 681.70 -41.4 -40.9 -41.4 76 -99 SPO 1997 10 10 03 45 28 10.6 -9 681.70 -41.4 -40.9 -41.5 76 -99 SPO 1997 10 10 03 46 29 10.2 -9 681.70 -41.4 -40.9 -41.4 77 -99 SPO 1997 10 10 03 47 29 10.2 -9 681.70 -41.4 -40.9 -41.4 78 -99 SPO 1997 10 10 03 48 29 9.5 -9 681.70 -41.4 -41.0 -41.6 78 -99 SPO 1997 10 10 03 49 28 9.6 -9 681.70 -41.5 -41.0 -41.6 78 -99 SPO 1997 10 10 03 50 27 9.5 -9 681.80 -41.5 -41.0 -41.6 77 -99 SPO 1997 10 10 03 51 27 9.4 -9 681.80 -41.5 -41.0 -41.6 76 -99 SPO 1997 10 10 03 52 26 9.7 -9 681.80 -41.5 -41.0 -41.6 76 -99 SPO 1997 10 10 03 53 27 9.2 -9 681.80 -41.5 -41.0 -41.5 76 -99 SPO 1997 10 10 03 54 27 8.9 -9 681.90 -41.6 -41.0 -41.6 77 -99 SPO 1997 10 10 03 55 27 9.2 -9 681.80 -41.6 -41.0 -41.6 76 -99 SPO 1997 10 10 03 56 26 9.2 -9 681.90 -41.6 -41.1 -41.6 76 -99 SPO 1997 10 10 03 57 27 9.0 -9 681.90 -41.6 -41.1 -41.7 76 -99 SPO 1997 10 10 03 58 26 9.3 -9 681.80 -41.6 -41.2 -41.6 76 -99 SPO 1997 10 10 03 59 26 9.2 -9 681.90 -41.7 -41.2 -41.7 78 -99 SPO 1997 10 10 04 00 27 8.9 -9 681.90 -41.7 -41.2 -41.8 78 0 SPO 1997 10 10 04 01 27 9.0 -9 681.90 -41.8 -41.3 -41.8 79 -99 SPO 1997 10 10 04 02 26 9.6 -9 681.90 -41.8 -41.3 -41.8 78 -99 SPO 1997 10 10 04 03 25 9.3 -9 681.90 -41.8 -41.3 -41.8 77 -99 SPO 1997 10 10 04 04 25 9.2 -9 681.90 -41.8 -41.3 -41.8 77 -99 SPO 1997 10 10 04 05 25 9.7 -9 681.90 -41.8 -41.3 -41.8 76 -99 SPO 1997 10 10 04 06 26 9.6 -9 681.90 -41.8 -41.3 -41.8 76 -99 SPO 1997 10 10 04 07 26 9.5 -9 681.90 -41.9 -41.3 -41.9 77 -99 SPO 1997 10 10 04 08 26 9.6 -9 681.90 -41.9 -41.3 -41.9 77 -99 SPO 1997 10 10 04 09 26 9.5 -9 681.90 -41.9 -41.3 -41.9 77 -99 SPO 1997 10 10 04 10 27 9.7 -9 681.90 -41.9 -41.4 -41.9 76 -99 SPO 1997 10 10 04 11 26 9.9 -9 681.90 -41.9 -41.4 -41.9 76 -99 SPO 1997 10 10 04 12 25 10.1 -9 681.90 -41.9 -41.4 -41.9 76 -99 SPO 1997 10 10 04 13 23 10.2 -9 681.90 -41.8 -41.4 -41.9 75 -99 SPO 1997 10 10 04 14 26 9.8 -9 681.90 -41.8 -41.4 -41.9 76 -99 SPO 1997 10 10 04 15 24 10.0 -9 681.90 -41.8 -41.4 -41.9 76 -99 SPO 1997 10 10 04 16 25 9.6 -9 681.90 -41.8 -41.4 -42.0 76 -99 SPO 1997 10 10 04 17 24 9.5 -9 681.90 -42.0 -41.5 -42.0 77 -99 SPO 1997 10 10 04 18 24 9.2 -9 682.00 -42.0 -41.5 -42.0 77 -99 SPO 1997 10 10 04 19 25 9.4 -9 681.90 -42.0 -41.6 -42.0 77 -99 SPO 1997 10 10 04 20 26 9.2 -9 681.90 -42.0 -41.7 -42.1 77 -99 SPO 1997 10 10 04 21 26 9.1 -9 681.90 -42.1 -41.7 -42.2 77 -99 SPO 1997 10 10 04 22 28 9.0 -9 681.90 -42.2 -41.8 -42.3 77 -99 SPO 1997 10 10 04 23 27 8.9 -9 681.90 -42.2 -41.8 -42.3 77 -99 SPO 1997 10 10 04 24 27 9.3 -9 681.90 -42.2 -41.8 -42.3 77 -99 SPO 1997 10 10 04 25 26 9.4 -9 681.90 -42.3 -41.8 -42.3 77 -99 SPO 1997 10 10 04 26 27 9.5 -9 681.90 -42.2 -41.8 -42.3 77 -99 SPO 1997 10 10 04 27 26 9.4 -9 681.90 -42.3 -41.8 -42.3 77 -99 SPO 1997 10 10 04 28 27 9.4 -9 681.90 -42.3 -41.9 -42.3 77 -99 SPO 1997 10 10 04 29 27 9.2 -9 681.90 -42.3 -41.9 -42.3 77 -99 SPO 1997 10 10 04 30 26 9.5 -9 681.90 -42.3 -41.9 -42.3 77 -99 SPO 1997 10 10 04 31 25 9.2 -9 681.90 -42.2 -41.9 -42.3 77 -99 SPO 1997 10 10 04 32 23 8.9 -9 682.00 -42.3 -41.9 -42.4 77 -99 SPO 1997 10 10 04 33 23 9.1 -9 682.00 -42.4 -42.0 -42.4 77 -99 SPO 1997 10 10 04 34 24 8.2 -9 682.00 -42.4 -42.0 -42.5 77 -99 SPO 1997 10 10 04 35 24 9.3 -9 682.00 -42.4 -42.0 -42.5 76 -99 SPO 1997 10 10 04 36 23 8.7 -9 682.00 -42.4 -42.0 -42.4 75 -99 SPO 1997 10 10 04 37 23 9.0 -9 682.00 -42.5 -42.1 -42.5 77 -99 SPO 1997 10 10 04 38 22 8.7 -9 682.00 -42.5 -42.1 -42.5 77 -99 SPO 1997 10 10 04 39 21 8.6 -9 682.10 -42.5 -42.1 -42.6 77 -99 SPO 1997 10 10 04 40 23 8.7 -9 682.10 -42.5 -42.2 -42.6 77 -99 SPO 1997 10 10 04 41 22 8.4 -9 682.10 -42.5 -42.2 -42.6 77 -99 SPO 1997 10 10 04 42 22 8.3 -9 682.10 -42.5 -42.2 -42.6 77 -99 SPO 1997 10 10 04 43 23 7.7 -9 682.10 -42.6 -42.3 -42.7 77 -99 SPO 1997 10 10 04 44 24 8.1 -9 682.10 -42.7 -42.3 -42.7 78 -99 SPO 1997 10 10 04 45 25 7.8 -9 682.00 -42.7 -42.3 -42.7 77 -99 SPO 1997 10 10 04 46 24 8.0 -9 682.00 -42.8 -42.3 -42.7 77 -99 SPO 1997 10 10 04 47 25 8.3 -9 682.00 -42.7 -42.3 -42.7 76 -99 SPO 1997 10 10 04 48 25 8.3 -9 682.00 -42.7 -42.3 -42.8 76 -99 SPO 1997 10 10 04 49 24 8.5 -9 682.00 -42.7 -42.3 -42.7 76 -99 SPO 1997 10 10 04 50 25 8.5 -9 682.00 -42.7 -42.3 -42.7 75 -99 SPO 1997 10 10 04 51 23 8.0 -9 682.00 -42.7 -42.4 -42.7 76 -99 SPO 1997 10 10 04 52 22 8.1 -9 682.10 -42.7 -42.4 -42.7 76 -99 SPO 1997 10 10 04 53 21 7.9 -9 682.10 -42.7 -42.3 -42.7 76 -99 SPO 1997 10 10 04 54 21 8.1 -9 682.10 -42.7 -42.4 -42.8 76 -99 SPO 1997 10 10 04 55 20 8.1 -9 682.10 -42.6 -42.4 -42.7 76 -99 SPO 1997 10 10 04 56 21 8.0 -9 682.10 -42.7 -42.5 -42.8 76 -99 SPO 1997 10 10 04 57 20 8.4 -9 682.10 -42.8 -42.5 -42.8 77 -99 SPO 1997 10 10 04 58 20 8.2 -9 682.10 -42.7 -42.5 -42.8 76 -99 SPO 1997 10 10 04 59 20 8.4 -9 682.10 -42.7 -42.5 -42.8 76 -99 SPO 1997 10 10 05 00 21 8.3 -9 682.10 -42.7 -42.5 -42.8 77 0 SPO 1997 10 10 05 01 20 8.3 -9 682.10 -42.8 -42.5 -42.9 77 -99 SPO 1997 10 10 05 02 21 8.8 -9 682.10 -42.9 -42.5 -42.9 77 -99 SPO 1997 10 10 05 03 23 8.7 -9 682.10 -42.9 -42.5 -42.9 77 -99 SPO 1997 10 10 05 04 24 9.3 -9 682.00 -42.9 -42.6 -42.9 77 -99 SPO 1997 10 10 05 05 25 8.7 -9 682.00 -42.8 -42.6 -43.0 76 -99 SPO 1997 10 10 05 06 24 8.7 -9 682.00 -42.9 -42.6 -43.0 77 -99 SPO 1997 10 10 05 07 24 9.1 -9 682.10 -42.9 -42.6 -43.0 76 -99 SPO 1997 10 10 05 08 24 9.2 -9 682.00 -42.9 -42.6 -42.9 76 -99 SPO 1997 10 10 05 09 25 8.6 -9 682.00 -42.9 -42.6 -43.0 76 -99 SPO 1997 10 10 05 10 24 8.6 -9 682.10 -43.0 -42.7 -43.1 76 -99 SPO 1997 10 10 05 11 24 8.8 -9 682.10 -43.0 -42.7 -43.0 76 -99 SPO 1997 10 10 05 12 24 8.5 -9 682.10 -43.0 -42.7 -43.1 76 -99 SPO 1997 10 10 05 13 24 8.7 -9 682.10 -43.0 -42.8 -43.1 76 -99 SPO 1997 10 10 05 14 25 8.6 -9 682.10 -43.0 -42.9 -43.1 74 -99 SPO 1997 10 10 05 15 23 8.8 -9 682.10 -43.1 -42.9 -43.2 75 -99 SPO 1997 10 10 05 16 23 9.3 -9 682.10 -43.1 -42.9 -43.1 75 -99 SPO 1997 10 10 05 17 24 8.8 -9 682.10 -43.1 -42.9 -43.2 74 -99 SPO 1997 10 10 05 18 24 9.1 -9 682.10 -43.2 -42.9 -43.2 76 -99 SPO 1997 10 10 05 19 24 9.1 -9 682.10 -43.2 -42.9 -43.2 76 -99 SPO 1997 10 10 05 20 25 9.1 -9 682.00 -43.2 -43.0 -43.2 76 -99 SPO 1997 10 10 05 21 26 9.3 -9 682.00 -43.3 -43.0 -43.3 76 -99 SPO 1997 10 10 05 22 26 9.4 -9 682.00 -43.2 -43.0 -43.3 76 -99 SPO 1997 10 10 05 23 24 9.5 -9 682.00 -43.2 -43.0 -43.4 76 -99 SPO 1997 10 10 05 24 25 9.4 -9 682.00 -43.2 -43.0 -43.3 76 -99 SPO 1997 10 10 05 25 26 9.1 -9 682.00 -43.3 -43.0 -43.4 76 -99 SPO 1997 10 10 05 26 27 8.8 -9 682.00 -43.3 -43.1 -43.4 76 -99 SPO 1997 10 10 05 27 25 8.6 -9 682.10 -43.4 -43.2 -43.4 76 -99 SPO 1997 10 10 05 28 25 8.4 -9 682.10 -43.4 -43.2 -43.5 76 -99 SPO 1997 10 10 05 29 26 8.4 -9 682.10 -43.5 -43.2 -43.6 75 -99 SPO 1997 10 10 05 30 27 8.8 -9 682.10 -43.5 -43.2 -43.6 75 -99 SPO 1997 10 10 05 31 26 8.6 -9 682.10 -43.5 -43.2 -43.6 75 -99 SPO 1997 10 10 05 32 27 8.4 -9 682.10 -43.6 -43.3 -43.6 76 -99 SPO 1997 10 10 05 33 28 9.1 -9 682.10 -43.6 -43.3 -43.6 76 -99 SPO 1997 10 10 05 34 29 8.7 -9 682.10 -43.5 -43.4 -43.6 75 -99 SPO 1997 10 10 05 35 29 8.4 -9 682.10 -43.6 -43.4 -43.7 76 -99 SPO 1997 10 10 05 36 28 8.7 -9 682.10 -43.7 -43.4 -43.7 77 -99 SPO 1997 10 10 05 37 28 8.9 -9 682.10 -43.7 -43.4 -43.7 76 -99 SPO 1997 10 10 05 38 31 9.3 -9 682.10 -43.6 -43.4 -43.7 75 -99 SPO 1997 10 10 05 39 31 9.1 -9 682.00 -43.7 -43.5 -43.8 76 -99 SPO 1997 10 10 05 40 31 9.5 -9 682.00 -43.7 -43.5 -43.8 75 -99 SPO 1997 10 10 05 41 30 9.2 -9 682.00 -43.8 -43.5 -43.8 75 -99 SPO 1997 10 10 05 42 29 9.2 -9 682.00 -43.8 -43.5 -43.9 75 -99 SPO 1997 10 10 05 43 28 9.3 -9 682.10 -43.8 -43.5 -43.9 75 -99 SPO 1997 10 10 05 44 29 9.5 -9 682.00 -43.8 -43.6 -43.9 75 -99 SPO 1997 10 10 05 45 29 9.2 -9 682.00 -43.8 -43.6 -43.9 75 -99 SPO 1997 10 10 05 46 27 9.5 -9 682.00 -43.8 -43.6 -43.8 75 -99 SPO 1997 10 10 05 47 26 9.0 -9 682.10 -43.8 -43.6 -44.0 75 -99 SPO 1997 10 10 05 48 28 9.2 -9 682.00 -43.9 -43.6 -44.0 75 -99 SPO 1997 10 10 05 49 27 9.2 -9 682.00 -43.9 -43.7 -44.0 75 -99 SPO 1997 10 10 05 50 26 9.2 -9 682.10 -44.0 -43.8 -44.0 76 -99 SPO 1997 10 10 05 51 28 9.2 -9 682.00 -44.0 -43.8 -44.0 76 -99 SPO 1997 10 10 05 52 26 9.1 -9 682.00 -43.9 -43.8 -44.0 75 -99 SPO 1997 10 10 05 53 25 9.3 -9 682.10 -43.9 -43.8 -44.0 75 -99 SPO 1997 10 10 05 54 27 9.6 -9 682.10 -43.9 -43.8 -44.0 74 -99 SPO 1997 10 10 05 55 26 9.1 -9 682.10 -43.9 -43.8 -44.0 73 -99 SPO 1997 10 10 05 56 27 9.5 -9 682.10 -44.0 -43.8 -44.0 75 -99 SPO 1997 10 10 05 57 27 9.4 -9 682.10 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 05 58 25 9.0 -9 682.10 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 05 59 22 9.3 -9 682.10 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 06 00 21 9.4 -9 682.10 -44.0 -43.8 -44.0 75 0 SPO 1997 10 10 06 01 23 9.5 -9 682.10 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 06 02 24 9.2 -9 682.00 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 06 03 25 9.5 -9 682.00 -44.1 -43.9 -44.1 76 -99 SPO 1997 10 10 06 04 22 9.8 -9 682.00 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 06 05 21 9.6 -9 682.10 -44.0 -43.8 -44.1 75 -99 SPO 1997 10 10 06 06 22 9.7 -9 682.10 -44.1 -43.8 -44.2 75 -99 SPO 1997 10 10 06 07 22 9.6 -9 682.10 -44.1 -43.9 -44.2 75 -99 SPO 1997 10 10 06 08 22 9.9 -9 682.10 -44.1 -43.9 -44.2 75 -99 SPO 1997 10 10 06 09 24 9.6 -9 682.10 -44.1 -44.0 -44.2 74 -99 SPO 1997 10 10 06 10 21 9.9 -9 682.10 -44.1 -44.0 -44.2 74 -99 SPO 1997 10 10 06 11 18 9.5 -9 682.20 -44.1 -44.0 -44.2 75 -99 SPO 1997 10 10 06 12 21 9.2 -9 682.20 -44.1 -44.0 -44.2 75 -99 SPO 1997 10 10 06 13 22 9.0 -9 682.10 -44.2 -44.1 -44.3 76 -99 SPO 1997 10 10 06 14 17 9.4 -9 682.20 -44.2 -44.0 -44.2 76 -99 SPO 1997 10 10 06 15 17 9.2 -9 682.30 -44.1 -44.0 -44.2 75 -99 SPO 1997 10 10 06 16 18 9.3 -9 682.20 -44.1 -44.0 -44.2 75 -99 SPO 1997 10 10 06 17 17 9.4 -9 682.30 -44.2 -44.0 -44.2 76 -99 SPO 1997 10 10 06 18 20 9.3 -9 682.20 -44.2 -44.0 -44.3 75 -99 SPO 1997 10 10 06 19 20 9.4 -9 682.20 -44.2 -44.0 -44.3 75 -99 SPO 1997 10 10 06 20 17 9.5 -9 682.20 -44.2 -44.0 -44.3 75 -99 SPO 1997 10 10 06 21 16 9.4 -9 682.20 -44.2 -44.0 -44.3 74 -99 SPO 1997 10 10 06 22 16 9.1 -9 682.20 -44.2 -44.0 -44.3 75 -99 SPO 1997 10 10 06 23 16 9.9 -9 682.20 -44.2 -44.0 -44.3 75 -99 SPO 1997 10 10 06 24 18 9.5 -9 682.20 -44.2 -44.1 -44.3 74 -99 SPO 1997 10 10 06 25 17 9.2 -9 682.20 -44.2 -44.1 -44.4 74 -99 SPO 1997 10 10 06 26 16 9.4 -9 682.30 -44.3 -44.1 -44.4 75 -99 SPO 1997 10 10 06 27 15 8.7 -9 682.30 -44.3 -44.2 -44.3 76 -99 SPO 1997 10 10 06 28 12 9.0 -9 682.40 -44.3 -44.2 -44.4 76 -99 SPO 1997 10 10 06 29 14 8.7 -9 682.40 -44.3 -44.2 -44.4 76 -99 SPO 1997 10 10 06 30 14 8.2 -9 682.40 -44.3 -44.2 -44.4 75 -99 SPO 1997 10 10 06 31 12 8.1 -9 682.50 -44.4 -44.2 -44.4 75 -99 SPO 1997 10 10 06 32 12 8.3 -9 682.60 -44.4 -44.2 -44.4 75 -99 SPO 1997 10 10 06 33 16 8.1 -9 682.50 -44.4 -44.2 -44.4 75 -99 SPO 1997 10 10 06 34 14 8.1 -9 682.50 -44.4 -44.2 -44.4 75 -99 SPO 1997 10 10 06 35 14 7.9 -9 682.50 -44.4 -44.2 -44.4 75 -99 SPO 1997 10 10 06 36 15 7.9 -9 682.60 -44.4 -44.2 -44.4 76 -99 SPO 1997 10 10 06 37 16 7.7 -9 682.60 -44.4 -44.3 -44.4 75 -99 SPO 1997 10 10 06 38 15 7.7 -9 682.60 -44.4 -44.3 -44.5 75 -99 SPO 1997 10 10 06 39 15 6.8 -9 682.70 -44.5 -44.3 -44.5 76 -99 SPO 1997 10 10 06 40 15 7.3 -9 682.70 -44.5 -44.3 -44.5 76 -99 SPO 1997 10 10 06 41 16 7.5 -9 682.70 -44.5 -44.3 -44.5 76 -99 SPO 1997 10 10 06 42 15 7.1 -9 682.60 -44.5 -44.3 -44.5 75 -99 SPO 1997 10 10 06 43 16 7.0 -9 682.70 -44.5 -44.4 -44.5 75 -99 SPO 1997 10 10 06 44 18 6.9 -9 682.70 -44.5 -44.4 -44.5 75 -99 SPO 1997 10 10 06 45 18 7.2 -9 682.70 -44.6 -44.4 -44.6 75 -99 SPO 1997 10 10 06 46 17 7.0 -9 682.70 -44.6 -44.4 -44.6 75 -99 SPO 1997 10 10 06 47 17 7.5 -9 682.70 -44.6 -44.4 -44.6 75 -99 SPO 1997 10 10 06 48 17 7.2 -9 682.70 -44.6 -44.5 -44.6 75 -99 SPO 1997 10 10 06 49 14 7.2 -9 682.80 -44.6 -44.5 -44.6 76 -99 SPO 1997 10 10 06 50 16 7.4 -9 682.80 -44.6 -44.5 -44.7 76 -99 SPO 1997 10 10 06 51 13 7.0 -9 682.80 -44.7 -44.5 -44.7 77 -99 SPO 1997 10 10 06 52 15 7.1 -9 682.70 -44.7 -44.5 -44.7 77 -99 SPO 1997 10 10 06 53 15 7.5 -9 682.70 -44.7 -44.5 -44.7 77 -99 SPO 1997 10 10 06 54 15 7.4 -9 682.70 -44.7 -44.5 -44.7 76 -99 SPO 1997 10 10 06 55 15 7.1 -9 682.70 -44.7 -44.5 -44.7 76 -99 SPO 1997 10 10 06 56 13 7.4 -9 682.70 -44.7 -44.5 -44.8 76 -99 SPO 1997 10 10 06 57 14 7.7 -9 682.80 -44.7 -44.5 -44.8 75 -99 SPO 1997 10 10 06 58 16 7.8 -9 682.70 -44.7 -44.5 -44.8 74 -99 SPO 1997 10 10 06 59 16 8.1 -9 682.60 -44.7 -44.5 -44.8 74 -99 SPO 1997 10 10 07 00 16 8.2 -9 682.60 -44.7 -44.5 -44.8 74 0 SPO 1997 10 10 07 01 16 8.1 -9 682.60 -44.7 -44.6 -44.8 74 -99 SPO 1997 10 10 07 02 16 8.1 -9 682.60 -44.8 -44.5 -44.8 76 -99 SPO 1997 10 10 07 03 16 8.0 -9 682.60 -44.8 -44.5 -44.8 76 -99 SPO 1997 10 10 07 04 15 8.0 -9 682.60 -44.8 -44.5 -44.8 75 -99 SPO 1997 10 10 07 05 15 8.4 -9 682.60 -44.8 -44.6 -44.8 76 -99 SPO 1997 10 10 07 06 16 8.2 -9 682.70 -44.8 -44.6 -44.9 76 -99 SPO 1997 10 10 07 07 16 7.9 -9 682.70 -44.9 -44.6 -44.9 77 -99 SPO 1997 10 10 07 08 17 7.9 -9 682.70 -44.9 -44.6 -44.9 77 -99 SPO 1997 10 10 07 09 16 7.6 -9 682.70 -44.9 -44.6 -44.9 76 -99 SPO 1997 10 10 07 10 14 7.7 -9 682.80 -44.9 -44.6 -44.9 76 -99 SPO 1997 10 10 07 11 16 7.4 -9 682.80 -45.0 -44.7 -45.0 76 -99 SPO 1997 10 10 07 12 14 7.5 -9 682.80 -44.9 -44.7 -44.9 74 -99 SPO 1997 10 10 07 13 15 7.5 -9 682.80 -45.0 -44.6 -45.0 75 -99 SPO 1997 10 10 07 14 15 7.3 -9 682.80 -45.0 -44.7 -45.0 75 -99 SPO 1997 10 10 07 15 12 6.9 -9 682.80 -45.0 -44.7 -45.0 76 -99 SPO 1997 10 10 07 16 13 7.2 -9 682.80 -45.0 -44.7 -45.0 75 -99 SPO 1997 10 10 07 17 11 7.0 -9 682.90 -45.0 -44.7 -45.0 75 -99 SPO 1997 10 10 07 18 11 7.3 -9 682.90 -45.0 -44.8 -45.0 76 -99 SPO 1997 10 10 07 19 13 7.6 -9 682.90 -45.1 -44.8 -45.1 77 -99 SPO 1997 10 10 07 20 13 7.2 -9 682.90 -45.1 -44.8 -45.1 77 -99 SPO 1997 10 10 07 21 14 7.1 -9 682.80 -45.1 -44.8 -45.1 76 -99 SPO 1997 10 10 07 22 13 7.3 -9 682.90 -45.1 -44.8 -45.2 76 -99 SPO 1997 10 10 07 23 14 7.2 -9 682.90 -45.1 -44.8 -45.1 75 -99 SPO 1997 10 10 07 24 16 7.5 -9 682.80 -45.1 -44.9 -45.1 74 -99 SPO 1997 10 10 07 25 15 7.4 -9 682.80 -45.2 -44.8 -45.2 73 -99 SPO 1997 10 10 07 26 13 7.5 -9 682.90 -45.2 -44.8 -45.1 73 -99 SPO 1997 10 10 07 27 12 7.2 -9 682.90 -45.2 -44.8 -45.2 74 -99 SPO 1997 10 10 07 28 13 7.4 -9 682.90 -45.2 -44.8 -45.2 76 -99 SPO 1997 10 10 07 29 14 7.4 -9 682.80 -45.3 -44.9 -45.3 77 -99 SPO 1997 10 10 07 30 15 7.8 -9 682.80 -45.3 -44.8 -45.2 77 -99 SPO 1997 10 10 07 31 13 8.0 -9 682.80 -45.3 -44.8 -45.2 77 -99 SPO 1997 10 10 07 32 13 7.9 -9 682.80 -45.3 -44.8 -45.3 77 -99 SPO 1997 10 10 07 33 14 8.1 -9 682.80 -45.3 -44.8 -45.3 75 -99 SPO 1997 10 10 07 34 16 8.0 -9 682.80 -45.3 -44.9 -45.3 75 -99 SPO 1997 10 10 07 35 18 7.7 -9 682.80 -45.3 -44.9 -45.3 75 -99 SPO 1997 10 10 07 36 19 7.6 -9 682.80 -45.4 -45.0 -45.4 76 -99 SPO 1997 10 10 07 37 21 7.7 -9 682.80 -45.5 -45.0 -45.4 76 -99 SPO 1997 10 10 07 38 21 7.6 -9 682.80 -45.4 -45.1 -45.4 74 -99 SPO 1997 10 10 07 39 21 7.7 -9 682.80 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 07 40 22 7.4 -9 682.80 -45.5 -45.1 -45.5 74 -99 SPO 1997 10 10 07 41 22 7.1 -9 682.80 -45.5 -45.2 -45.5 74 -99 SPO 1997 10 10 07 42 21 7.0 -9 682.90 -45.6 -45.2 -45.5 75 -99 SPO 1997 10 10 07 43 19 7.0 -9 682.90 -45.6 -45.2 -45.5 74 -99 SPO 1997 10 10 07 44 18 7.0 -9 682.90 -45.6 -45.2 -45.5 74 -99 SPO 1997 10 10 07 45 19 7.3 -9 682.90 -45.6 -45.2 -45.5 74 -99 SPO 1997 10 10 07 46 20 7.2 -9 682.90 -45.6 -45.2 -45.6 75 -99 SPO 1997 10 10 07 47 20 7.8 -9 682.80 -45.6 -45.1 -45.5 76 -99 SPO 1997 10 10 07 48 19 7.6 -9 682.80 -45.6 -45.1 -45.5 76 -99 SPO 1997 10 10 07 49 18 7.5 -9 682.80 -45.6 -45.1 -45.6 75 -99 SPO 1997 10 10 07 50 18 7.8 -9 682.90 -45.6 -45.1 -45.5 74 -99 SPO 1997 10 10 07 51 18 7.6 -9 682.90 -45.6 -45.1 -45.6 74 -99 SPO 1997 10 10 07 52 17 7.7 -9 682.90 -45.5 -45.2 -45.5 73 -99 SPO 1997 10 10 07 53 17 7.9 -9 682.90 -45.6 -45.2 -45.5 74 -99 SPO 1997 10 10 07 54 18 8.2 -9 682.80 -45.5 -45.2 -45.5 73 -99 SPO 1997 10 10 07 55 18 8.5 -9 682.80 -45.5 -45.1 -45.5 74 -99 SPO 1997 10 10 07 56 16 8.1 -9 682.80 -45.5 -45.1 -45.6 74 -99 SPO 1997 10 10 07 57 16 8.3 -9 682.80 -45.6 -45.1 -45.6 75 -99 SPO 1997 10 10 07 58 16 8.4 -9 682.90 -45.6 -45.1 -45.6 76 -99 SPO 1997 10 10 07 59 17 8.6 -9 682.80 -45.6 -45.1 -45.6 76 -99 SPO 1997 10 10 08 00 17 8.7 -9 682.80 -45.6 -45.1 -45.6 76 0 SPO 1997 10 10 08 01 16 8.9 -9 682.80 -45.6 -45.0 -45.6 76 -99 SPO 1997 10 10 08 02 16 9.0 -9 682.80 -45.6 -45.0 -45.6 75 -99 SPO 1997 10 10 08 03 16 8.9 -9 682.80 -45.5 -45.0 -45.5 73 -99 SPO 1997 10 10 08 04 17 9.2 -9 682.80 -45.5 -45.0 -45.5 73 -99 SPO 1997 10 10 08 05 17 9.2 -9 682.80 -45.4 -45.0 -45.5 73 -99 SPO 1997 10 10 08 06 17 9.4 -9 682.80 -45.5 -45.0 -45.5 73 -99 SPO 1997 10 10 08 07 17 9.2 -9 682.80 -45.4 -45.0 -45.5 73 -99 SPO 1997 10 10 08 08 15 9.1 -9 682.90 -45.4 -45.0 -45.4 74 -99 SPO 1997 10 10 08 09 14 8.9 -9 682.90 -45.4 -45.1 -45.4 74 -99 SPO 1997 10 10 08 10 13 8.8 -9 682.90 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 11 13 8.8 -9 682.90 -45.5 -45.1 -45.5 76 -99 SPO 1997 10 10 08 12 15 8.9 -9 682.90 -45.5 -45.1 -45.5 76 -99 SPO 1997 10 10 08 13 15 8.9 -9 682.90 -45.5 -45.1 -45.5 76 -99 SPO 1997 10 10 08 14 13 8.7 -9 682.90 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 15 12 8.7 -9 682.90 -45.5 -45.0 -45.5 74 -99 SPO 1997 10 10 08 16 12 8.8 -9 682.90 -45.5 -45.0 -45.5 74 -99 SPO 1997 10 10 08 17 13 9.2 -9 682.90 -45.5 -45.0 -45.5 74 -99 SPO 1997 10 10 08 18 14 9.2 -9 682.90 -45.5 -45.0 -45.6 74 -99 SPO 1997 10 10 08 19 13 9.3 -9 682.90 -45.5 -45.0 -45.5 74 -99 SPO 1997 10 10 08 20 14 9.0 -9 682.90 -45.5 -45.0 -45.5 75 -99 SPO 1997 10 10 08 21 13 9.2 -9 682.90 -45.4 -45.0 -45.5 74 -99 SPO 1997 10 10 08 22 14 9.3 -9 682.80 -45.4 -45.0 -45.5 74 -99 SPO 1997 10 10 08 23 14 9.5 -9 682.80 -45.4 -44.9 -45.4 75 -99 SPO 1997 10 10 08 24 14 9.8 -9 682.90 -45.3 -44.9 -45.4 73 -99 SPO 1997 10 10 08 25 13 9.2 -9 682.80 -45.3 -44.9 -45.4 74 -99 SPO 1997 10 10 08 26 14 9.4 -9 682.90 -45.4 -45.0 -45.4 75 -99 SPO 1997 10 10 08 27 13 9.2 -9 682.90 -45.4 -45.0 -45.4 75 -99 SPO 1997 10 10 08 28 12 9.2 -9 682.90 -45.3 -45.0 -45.3 74 -99 SPO 1997 10 10 08 29 11 9.2 -9 682.90 -45.3 -45.0 -45.4 74 -99 SPO 1997 10 10 08 30 11 9.0 -9 682.90 -45.3 -45.0 -45.4 73 -99 SPO 1997 10 10 08 31 12 9.4 -9 682.90 -45.3 -45.0 -45.4 73 -99 SPO 1997 10 10 08 32 12 9.7 -9 682.90 -45.3 -45.0 -45.4 73 -99 SPO 1997 10 10 08 33 12 9.3 -9 682.90 -45.3 -44.9 -45.4 74 -99 SPO 1997 10 10 08 34 12 9.3 -9 682.90 -45.3 -45.0 -45.4 74 -99 SPO 1997 10 10 08 35 12 9.3 -9 682.90 -45.4 -45.0 -45.4 75 -99 SPO 1997 10 10 08 36 11 9.4 -9 682.90 -45.3 -45.0 -45.4 74 -99 SPO 1997 10 10 08 37 11 9.2 -9 682.90 -45.3 -45.0 -45.4 75 -99 SPO 1997 10 10 08 38 13 9.2 -9 682.90 -45.4 -45.0 -45.4 76 -99 SPO 1997 10 10 08 39 13 9.2 -9 682.90 -45.4 -45.0 -45.4 76 -99 SPO 1997 10 10 08 40 13 8.9 -9 682.90 -45.4 -45.0 -45.4 75 -99 SPO 1997 10 10 08 41 13 9.2 -9 682.90 -45.4 -45.0 -45.4 75 -99 SPO 1997 10 10 08 42 13 8.4 -9 682.90 -45.4 -45.0 -45.4 74 -99 SPO 1997 10 10 08 43 13 8.8 -9 682.90 -45.4 -45.1 -45.4 73 -99 SPO 1997 10 10 08 44 13 9.0 -9 683.00 -45.4 -45.1 -45.4 74 -99 SPO 1997 10 10 08 45 13 9.1 -9 683.00 -45.4 -45.1 -45.4 74 -99 SPO 1997 10 10 08 46 13 9.1 -9 683.00 -45.4 -45.1 -45.4 75 -99 SPO 1997 10 10 08 47 14 9.4 -9 682.90 -45.4 -45.1 -45.5 75 -99 SPO 1997 10 10 08 48 15 9.5 -9 683.00 -45.4 -45.1 -45.4 75 -99 SPO 1997 10 10 08 49 15 9.3 -9 683.00 -45.4 -45.1 -45.5 75 -99 SPO 1997 10 10 08 50 14 9.4 -9 683.00 -45.4 -45.1 -45.4 75 -99 SPO 1997 10 10 08 51 15 9.4 -9 683.00 -45.4 -45.1 -45.4 75 -99 SPO 1997 10 10 08 52 14 9.2 -9 683.00 -45.4 -45.1 -45.5 75 -99 SPO 1997 10 10 08 53 14 9.3 -9 683.00 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 54 14 9.7 -9 683.00 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 55 14 9.2 -9 683.00 -45.4 -45.1 -45.5 73 -99 SPO 1997 10 10 08 56 14 9.5 -9 683.00 -45.5 -45.1 -45.5 74 -99 SPO 1997 10 10 08 57 14 9.6 -9 683.00 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 58 15 9.8 -9 683.00 -45.5 -45.1 -45.5 75 -99 SPO 1997 10 10 08 59 15 9.7 -9 683.00 -45.5 -45.2 -45.5 75 -99 SPO 1997 10 10 09 00 16 9.3 -9 683.00 -45.5 -45.2 -45.5 75 0 SPO 1997 10 10 09 01 16 9.7 -9 683.00 -45.6 -45.2 -45.6 76 -99 SPO 1997 10 10 09 02 15 9.4 -9 683.00 -45.6 -45.2 -45.6 76 -99 SPO 1997 10 10 09 03 14 9.6 -9 683.00 -45.6 -45.2 -45.6 76 -99 SPO 1997 10 10 09 04 15 9.9 -9 683.00 -45.6 -45.2 -45.6 75 -99 SPO 1997 10 10 09 05 15 9.5 -9 683.00 -45.6 -45.2 -45.6 75 -99 SPO 1997 10 10 09 06 16 9.4 -9 683.00 -45.6 -45.2 -45.6 74 -99 SPO 1997 10 10 09 07 17 9.5 -9 683.00 -45.6 -45.2 -45.6 74 -99 SPO 1997 10 10 09 08 17 9.6 -9 683.00 -45.6 -45.2 -45.6 74 -99 SPO 1997 10 10 09 09 17 9.8 -9 683.00 -45.6 -45.3 -45.6 74 -99 SPO 1997 10 10 09 10 18 9.3 -9 682.90 -45.7 -45.3 -45.7 76 -99 SPO 1997 10 10 09 11 18 9.7 -9 682.90 -45.7 -45.3 -45.7 76 -99 SPO 1997 10 10 09 12 17 9.7 -9 682.90 -45.7 -45.3 -45.6 76 -99 SPO 1997 10 10 09 13 18 10.0 -9 682.90 -45.7 -45.3 -45.6 76 -99 SPO 1997 10 10 09 14 18 9.9 -9 682.90 -45.7 -45.3 -45.6 76 -99 SPO 1997 10 10 09 15 18 9.5 -9 683.00 -45.7 -45.3 -45.7 76 -99 SPO 1997 10 10 09 16 18 9.7 -9 683.00 -45.7 -45.3 -45.7 75 -99 SPO 1997 10 10 09 17 18 9.6 -9 683.00 -45.8 -45.3 -45.7 76 -99 SPO 1997 10 10 09 18 17 9.4 -9 683.00 -45.8 -45.4 -45.7 75 -99 SPO 1997 10 10 09 19 15 9.8 -9 683.00 -45.8 -45.4 -45.8 74 -99 SPO 1997 10 10 09 20 15 9.7 -9 683.00 -45.8 -45.4 -45.8 74 -99 SPO 1997 10 10 09 21 16 9.5 -9 683.00 -45.8 -45.4 -45.8 74 -99 SPO 1997 10 10 09 22 15 9.8 -9 683.00 -45.9 -45.4 -45.8 75 -99 SPO 1997 10 10 09 23 15 9.8 -9 683.00 -45.9 -45.4 -45.8 76 -99 SPO 1997 10 10 09 24 14 9.3 -9 683.10 -45.9 -45.4 -45.8 76 -99 SPO 1997 10 10 09 25 14 9.4 -9 683.10 -46.0 -45.5 -45.9 77 -99 SPO 1997 10 10 09 26 14 9.7 -9 683.10 -45.9 -45.5 -45.8 76 -99 SPO 1997 10 10 09 27 14 9.4 -9 683.10 -45.9 -45.5 -45.8 76 -99 SPO 1997 10 10 09 28 14 9.5 -9 683.10 -46.0 -45.5 -45.9 77 -99 SPO 1997 10 10 09 29 15 9.4 -9 683.10 -46.0 -45.6 -45.9 76 -99 SPO 1997 10 10 09 30 15 9.5 -9 683.10 -46.1 -45.6 -46.0 76 -99 SPO 1997 10 10 09 31 15 9.7 -9 683.10 -46.1 -45.6 -46.0 76 -99 SPO 1997 10 10 09 32 15 8.8 -9 683.10 -46.1 -45.6 -46.1 75 -99 SPO 1997 10 10 09 33 15 9.6 -9 683.10 -46.2 -45.6 -46.1 76 -99 SPO 1997 10 10 09 34 16 9.8 -9 683.10 -46.1 -45.6 -46.1 74 -99 SPO 1997 10 10 09 35 16 9.8 -9 683.10 -46.1 -45.7 -46.1 75 -99 SPO 1997 10 10 09 36 16 9.9 -9 683.10 -46.1 -45.7 -46.1 75 -99 SPO 1997 10 10 09 37 15 10.4 -9 683.10 -46.2 -45.7 -46.1 76 -99 SPO 1997 10 10 09 38 15 10.1 -9 683.10 -46.2 -45.7 -46.2 76 -99 SPO 1997 10 10 09 39 15 9.9 -9 683.10 -46.2 -45.7 -46.2 75 -99 SPO 1997 10 10 09 40 14 10.1 -9 683.10 -46.3 -45.8 -46.2 76 -99 SPO 1997 10 10 09 41 15 10.6 -9 683.10 -46.3 -45.7 -46.2 76 -99 SPO 1997 10 10 09 42 14 10.3 -9 683.10 -46.3 -45.8 -46.3 76 -99 SPO 1997 10 10 09 43 14 10.4 -9 683.10 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 44 14 10.3 -9 683.10 -46.3 -45.7 -46.3 75 -99 SPO 1997 10 10 09 45 14 10.4 -9 683.20 -46.3 -45.7 -46.3 75 -99 SPO 1997 10 10 09 46 14 10.2 -9 683.20 -46.3 -45.7 -46.2 75 -99 SPO 1997 10 10 09 47 15 10.2 -9 683.20 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 48 16 10.1 -9 683.20 -46.3 -45.8 -46.3 76 -99 SPO 1997 10 10 09 49 15 10.1 -9 683.20 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 50 15 10.2 -9 683.20 -46.3 -45.7 -46.2 76 -99 SPO 1997 10 10 09 51 15 10.2 -9 683.20 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 52 15 10.1 -9 683.20 -46.3 -45.7 -46.2 75 -99 SPO 1997 10 10 09 53 15 9.9 -9 683.20 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 54 14 10.0 -9 683.20 -46.3 -45.7 -46.3 76 -99 SPO 1997 10 10 09 55 14 9.8 -9 683.30 -46.4 -45.7 -46.3 77 -99 SPO 1997 10 10 09 56 14 9.8 -9 683.30 -46.4 -45.8 -46.3 76 -99 SPO 1997 10 10 09 57 14 9.5 -9 683.30 -46.4 -45.8 -46.4 76 -99 SPO 1997 10 10 09 58 13 9.3 -9 683.30 -46.4 -45.9 -46.4 74 -99 SPO 1997 10 10 09 59 14 9.2 -9 683.30 -46.4 -45.9 -46.4 74 -99 SPO 1997 10 10 10 00 14 9.5 -9 683.30 -46.5 -45.9 -46.4 75 0 SPO 1997 10 10 10 01 13 9.3 -9 683.30 -46.5 -45.9 -46.4 76 -99 SPO 1997 10 10 10 02 13 9.3 -9 683.40 -46.5 -45.9 -46.4 76 -99 SPO 1997 10 10 10 03 13 9.5 -9 683.40 -46.4 -45.9 -46.4 76 -99 SPO 1997 10 10 10 04 13 9.6 -9 683.40 -46.5 -45.9 -46.4 77 -99 SPO 1997 10 10 10 05 13 9.5 -9 683.40 -46.5 -45.9 -46.4 77 -99 SPO 1997 10 10 10 06 13 9.6 -9 683.30 -46.4 -45.9 -46.4 76 -99 SPO 1997 10 10 10 07 13 9.6 -9 683.30 -46.5 -45.9 -46.4 76 -99 SPO 1997 10 10 10 08 13 9.6 -9 683.30 -46.5 -45.9 -46.4 75 -99 SPO 1997 10 10 10 09 12 9.6 -9 683.30 -46.5 -45.9 -46.5 74 -99 SPO 1997 10 10 10 10 13 9.6 -9 683.30 -46.6 -46.0 -46.5 75 -99 SPO 1997 10 10 10 11 13 10.0 -9 683.30 -46.5 -46.0 -46.5 74 -99 SPO 1997 10 10 10 12 11 9.7 -9 683.40 -46.5 -46.0 -46.4 74 -99 SPO 1997 10 10 10 13 12 9.4 -9 683.40 -46.6 -46.0 -46.5 76 -99 SPO 1997 10 10 10 14 13 9.5 -9 683.40 -46.6 -46.0 -46.6 76 -99 SPO 1997 10 10 10 15 13 9.7 -9 683.30 -46.6 -46.0 -46.5 76 -99 SPO 1997 10 10 10 16 12 9.8 -9 683.30 -46.6 -46.0 -46.5 76 -99 SPO 1997 10 10 10 17 12 9.7 -9 683.30 -46.6 -46.0 -46.6 77 -99 SPO 1997 10 10 10 18 12 9.8 -9 683.30 -46.6 -46.0 -46.6 76 -99 SPO 1997 10 10 10 19 13 10.1 -9 683.30 -46.7 -46.0 -46.6 77 -99 SPO 1997 10 10 10 20 13 10.2 -9 683.20 -46.7 -46.0 -46.6 76 -99 SPO 1997 10 10 10 21 13 10.7 -9 683.20 -46.7 -45.9 -46.6 75 -99 SPO 1997 10 10 10 22 13 10.3 -9 683.20 -46.6 -45.9 -46.6 74 -99 SPO 1997 10 10 10 23 13 10.1 -9 683.20 -46.6 -45.9 -46.6 75 -99 SPO 1997 10 10 10 24 13 10.2 -9 683.30 -46.7 -45.9 -46.6 76 -99 SPO 1997 10 10 10 25 13 10.0 -9 683.30 -46.7 -45.9 -46.6 77 -99 SPO 1997 10 10 10 26 12 10.2 -9 683.30 -46.6 -45.9 -46.6 75 -99 SPO 1997 10 10 10 27 12 10.1 -9 683.30 -46.6 -46.0 -46.6 76 -99 SPO 1997 10 10 10 28 12 9.9 -9 683.30 -46.6 -46.0 -46.6 77 -99 SPO 1997 10 10 10 29 13 10.2 -9 683.20 -46.7 -46.0 -46.6 78 -99 SPO 1997 10 10 10 30 14 10.5 -9 683.20 -46.7 -46.0 -46.6 77 -99 SPO 1997 10 10 10 31 14 10.5 -9 683.20 -46.7 -46.0 -46.7 77 -99 SPO 1997 10 10 10 32 14 10.3 -9 683.20 -46.7 -46.0 -46.7 77 -99 SPO 1997 10 10 10 33 15 10.4 -9 683.20 -46.8 -46.0 -46.7 77 -99 SPO 1997 10 10 10 34 15 10.5 -9 683.20 -46.8 -46.0 -46.7 76 -99 SPO 1997 10 10 10 35 14 10.8 -9 683.20 -46.8 -46.0 -46.7 75 -99 SPO 1997 10 10 10 36 14 10.4 -9 683.20 -46.8 -46.0 -46.7 75 -99 SPO 1997 10 10 10 37 14 10.5 -9 683.20 -46.8 -46.0 -46.7 75 -99 SPO 1997 10 10 10 38 15 10.5 -9 683.20 -46.7 -46.0 -46.7 74 -99 SPO 1997 10 10 10 39 14 10.8 -9 683.20 -46.8 -46.0 -46.7 76 -99 SPO 1997 10 10 10 40 14 10.8 -9 683.20 -46.8 -46.0 -46.7 76 -99 SPO 1997 10 10 10 41 14 10.9 -9 683.20 -46.8 -45.9 -46.7 77 -99 SPO 1997 10 10 10 42 14 10.8 -9 683.20 -46.8 -45.9 -46.8 77 -99 SPO 1997 10 10 10 43 14 10.7 -9 683.20 -46.8 -45.9 -46.8 76 -99 SPO 1997 10 10 10 44 14 10.9 -9 683.20 -46.8 -46.0 -46.8 75 -99 SPO 1997 10 10 10 45 13 10.7 -9 683.30 -46.8 -46.0 -46.8 76 -99 SPO 1997 10 10 10 46 14 10.8 -9 683.30 -46.8 -46.1 -46.8 75 -99 SPO 1997 10 10 10 47 15 10.5 -9 683.30 -46.9 -46.1 -46.9 76 -99 SPO 1997 10 10 10 48 14 10.5 -9 683.30 -47.0 -46.1 -46.9 76 -99 SPO 1997 10 10 10 49 14 10.6 -9 683.30 -46.9 -46.1 -46.9 75 -99 SPO 1997 10 10 10 50 15 10.3 -9 683.30 -47.0 -46.2 -46.9 77 -99 SPO 1997 10 10 10 51 15 10.4 -9 683.30 -47.0 -46.2 -47.0 77 -99 SPO 1997 10 10 10 52 14 10.5 -9 683.30 -47.0 -46.2 -47.0 76 -99 SPO 1997 10 10 10 53 15 10.8 -9 683.30 -47.0 -46.1 -47.0 76 -99 SPO 1997 10 10 10 54 15 10.6 -9 683.30 -47.0 -46.1 -47.0 76 -99 SPO 1997 10 10 10 55 15 10.8 -9 683.30 -47.0 -46.2 -47.0 76 -99 SPO 1997 10 10 10 56 16 10.5 -9 683.30 -47.0 -46.2 -47.0 77 -99 SPO 1997 10 10 10 57 16 10.4 -9 683.30 -47.1 -46.2 -47.0 77 -99 SPO 1997 10 10 10 58 15 10.4 -9 683.30 -47.1 -46.2 -47.0 76 -99 SPO 1997 10 10 10 59 16 10.3 -9 683.30 -47.1 -46.2 -47.0 76 -99 SPO 1997 10 10 11 00 16 10.2 -9 683.30 -47.1 -46.2 -47.0 75 0 SPO 1997 10 10 11 01 17 10.4 -9 683.30 -47.1 -46.2 -47.0 74 -99 SPO 1997 10 10 11 02 17 10.2 -9 683.30 -47.1 -46.2 -47.0 74 -99 SPO 1997 10 10 11 03 17 10.6 -9 683.30 -47.2 -46.3 -47.1 76 -99 SPO 1997 10 10 11 04 17 10.5 -9 683.30 -47.1 -46.2 -47.1 75 -99 SPO 1997 10 10 11 05 16 10.3 -9 683.30 -47.2 -46.2 -47.1 76 -99 SPO 1997 10 10 11 06 16 10.2 -9 683.40 -47.2 -46.2 -47.1 76 -99 SPO 1997 10 10 11 07 15 10.0 -9 683.40 -47.1 -46.2 -47.1 76 -99 SPO 1997 10 10 11 08 16 9.9 -9 683.40 -47.2 -46.3 -47.1 76 -99 SPO 1997 10 10 11 09 16 9.7 -9 683.40 -47.2 -46.4 -47.1 76 -99 SPO 1997 10 10 11 10 15 9.6 -9 683.50 -47.2 -46.4 -47.1 76 -99 SPO 1997 10 10 11 11 15 9.1 -9 683.50 -47.3 -46.4 -47.2 76 -99 SPO 1997 10 10 11 12 16 9.0 -9 683.50 -47.3 -46.4 -47.2 76 -99 SPO 1997 10 10 11 13 17 9.1 -9 683.50 -47.4 -46.5 -47.2 76 -99 SPO 1997 10 10 11 14 18 8.9 -9 683.60 -47.4 -46.5 -47.2 74 -99 SPO 1997 10 10 11 15 18 8.8 -9 683.60 -47.4 -46.5 -47.2 76 -99 SPO 1997 10 10 11 16 18 8.7 -9 683.60 -47.4 -46.5 -47.3 76 -99 SPO 1997 10 10 11 17 17 8.3 -9 683.60 -47.4 -46.5 -47.3 76 -99 SPO 1997 10 10 11 18 17 8.3 -9 683.70 -47.4 -46.5 -47.2 76 -99 SPO 1997 10 10 11 19 17 8.3 -9 683.70 -47.4 -46.6 -47.2 76 -99 SPO 1997 10 10 11 20 16 8.1 -9 683.70 -47.4 -46.6 -47.2 76 -99 SPO 1997 10 10 11 21 16 7.8 -9 683.70 -47.4 -46.7 -47.3 76 -99 SPO 1997 10 10 11 22 15 7.9 -9 683.80 -47.5 -46.7 -47.3 78 -99 SPO 1997 10 10 11 23 16 7.7 -9 683.80 -47.5 -46.8 -47.3 78 -99 SPO 1997 10 10 11 24 17 7.8 -9 683.80 -47.6 -46.7 -47.4 78 -99 SPO 1997 10 10 11 25 18 7.7 -9 683.80 -47.6 -46.8 -47.4 77 -99 SPO 1997 10 10 11 26 18 7.9 -9 683.80 -47.6 -46.8 -47.4 76 -99 SPO 1997 10 10 11 27 19 7.8 -9 683.80 -47.6 -46.8 -47.4 76 -99 SPO 1997 10 10 11 28 19 7.8 -9 683.80 -47.6 -46.8 -47.5 76 -99 SPO 1997 10 10 11 29 19 7.5 -9 683.90 -47.7 -46.8 -47.5 76 -99 SPO 1997 10 10 11 30 19 7.6 -9 683.90 -47.7 -46.8 -47.5 76 -99 SPO 1997 10 10 11 31 20 7.6 -9 683.90 -47.8 -46.8 -47.6 77 -99 SPO 1997 10 10 11 32 21 7.6 -9 683.90 -47.8 -46.9 -47.6 76 -99 SPO 1997 10 10 11 33 21 7.8 -9 683.90 -47.8 -46.8 -47.6 76 -99 SPO 1997 10 10 11 34 21 7.8 -9 683.90 -47.8 -46.8 -47.6 76 -99 SPO 1997 10 10 11 35 21 7.8 -9 683.90 -47.8 -46.8 -47.6 76 -99 SPO 1997 10 10 11 36 22 7.5 -9 683.90 -47.8 -46.8 -47.6 76 -99 SPO 1997 10 10 11 37 23 7.3 -9 683.90 -47.8 -46.9 -47.6 75 -99 SPO 1997 10 10 11 38 22 7.2 -9 683.90 -47.9 -47.0 -47.6 75 -99 SPO 1997 10 10 11 39 24 7.0 -9 683.90 -47.9 -47.1 -47.7 76 -99 SPO 1997 10 10 11 40 25 6.9 -9 683.90 -48.0 -47.1 -47.7 77 -99 SPO 1997 10 10 11 41 25 6.8 -9 683.90 -48.0 -47.1 -47.7 77 -99 SPO 1997 10 10 11 42 25 6.7 -9 683.90 -48.0 -47.1 -47.8 77 -99 SPO 1997 10 10 11 43 24 6.9 -9 683.90 -48.0 -47.2 -47.7 77 -99 SPO 1997 10 10 11 44 23 6.8 -9 683.90 -48.0 -47.2 -47.7 77 -99 SPO 1997 10 10 11 45 23 7.1 -9 683.90 -48.0 -47.1 -47.7 77 -99 SPO 1997 10 10 11 46 22 7.2 -9 683.90 -48.0 -47.1 -47.7 77 -99 SPO 1997 10 10 11 47 21 7.2 -9 683.90 -48.0 -47.0 -47.7 77 -99 SPO 1997 10 10 11 48 21 7.5 -9 683.90 -48.0 -47.0 -47.7 77 -99 SPO 1997 10 10 11 49 20 7.4 -9 683.90 -48.0 -47.0 -47.7 77 -99 SPO 1997 10 10 11 50 22 7.5 -9 683.90 -48.0 -47.0 -47.8 77 -99 SPO 1997 10 10 11 51 21 8.1 -9 683.80 -47.9 -47.0 -47.7 75 -99 SPO 1997 10 10 11 52 22 7.9 -9 683.80 -47.9 -47.0 -47.7 75 -99 SPO 1997 10 10 11 53 21 8.0 -9 683.80 -48.0 -47.0 -47.8 76 -99 SPO 1997 10 10 11 54 20 8.0 -9 683.80 -48.0 -47.0 -47.8 76 -99 SPO 1997 10 10 11 55 21 8.1 -9 683.80 -48.0 -47.0 -47.8 76 -99 SPO 1997 10 10 11 56 21 7.8 -9 683.80 -48.0 -47.2 -47.8 76 -99 SPO 1997 10 10 11 57 23 8.0 -9 683.80 -48.0 -47.2 -47.8 76 -99 SPO 1997 10 10 11 58 23 8.1 -9 683.80 -48.0 -47.3 -47.8 76 -99 SPO 1997 10 10 11 59 24 8.0 -9 683.80 -48.1 -47.3 -47.9 77 -99 SPO 1997 10 10 12 00 24 8.2 -9 683.70 -48.1 -47.3 -47.9 77 0 SPO 1997 10 10 12 01 25 8.1 -9 683.70 -48.2 -47.4 -48.0 78 -99 SPO 1997 10 10 12 02 25 7.8 -9 683.70 -48.1 -47.4 -47.9 76 -99 SPO 1997 10 10 12 03 25 7.8 -9 683.80 -48.2 -47.4 -47.9 76 -99 SPO 1997 10 10 12 04 24 7.6 -9 683.80 -48.2 -47.4 -47.9 75 -99 SPO 1997 10 10 12 05 24 7.3 -9 683.80 -48.2 -47.4 -47.9 75 -99 SPO 1997 10 10 12 06 24 7.4 -9 683.80 -48.1 -47.5 -47.9 75 -99 SPO 1997 10 10 12 07 24 7.1 -9 683.90 -48.1 -47.5 -47.8 75 -99 SPO 1997 10 10 12 08 23 7.3 -9 683.90 -48.0 -47.5 -47.8 75 -99 SPO 1997 10 10 12 09 22 6.8 -9 683.90 -48.0 -47.5 -47.8 76 -99 SPO 1997 10 10 12 10 21 7.3 -9 683.90 -48.0 -47.5 -47.8 76 -99 SPO 1997 10 10 12 11 20 7.3 -9 683.90 -48.0 -47.4 -47.8 76 -99 SPO 1997 10 10 12 12 20 8.2 -9 683.90 -48.0 -47.4 -47.9 76 -99 SPO 1997 10 10 12 13 20 8.6 -9 683.80 -48.0 -47.3 -47.9 77 -99 SPO 1997 10 10 12 14 21 8.8 -9 683.80 -48.0 -47.3 -47.8 76 -99 SPO 1997 10 10 12 15 21 9.2 -9 683.70 -48.0 -47.3 -47.8 77 -99 SPO 1997 10 10 12 16 20 9.0 -9 683.70 -48.0 -47.3 -47.8 76 -99 SPO 1997 10 10 12 17 20 8.8 -9 683.70 -48.0 -47.3 -47.8 76 -99 SPO 1997 10 10 12 18 19 8.9 -9 683.80 -48.0 -47.3 -47.8 76 -99 SPO 1997 10 10 12 19 19 8.8 -9 683.80 -48.0 -47.3 -47.8 77 -99 SPO 1997 10 10 12 20 18 9.1 -9 683.80 -48.0 -47.3 -47.8 77 -99 SPO 1997 10 10 12 21 17 9.0 -9 683.80 -47.9 -47.2 -47.8 76 -99 SPO 1997 10 10 12 22 17 9.2 -9 683.80 -47.9 -47.2 -47.8 77 -99 SPO 1997 10 10 12 23 17 8.7 -9 683.80 -47.9 -47.2 -47.8 77 -99 SPO 1997 10 10 12 24 17 8.7 -9 683.80 -48.0 -47.2 -47.8 78 -99 SPO 1997 10 10 12 25 17 8.6 -9 683.80 -48.0 -47.3 -47.9 78 -99 SPO 1997 10 10 12 26 17 9.0 -9 683.80 -48.0 -47.3 -47.9 76 -99 SPO 1997 10 10 12 27 18 9.1 -9 683.80 -48.0 -47.2 -47.9 75 -99 SPO 1997 10 10 12 28 17 9.1 -9 683.80 -48.0 -47.2 -47.9 75 -99 SPO 1997 10 10 12 29 17 8.9 -9 683.80 -48.0 -47.2 -47.9 75 -99 SPO 1997 10 10 12 30 17 9.2 -9 683.80 -48.0 -47.2 -47.9 75 -99 SPO 1997 10 10 12 31 16 9.0 -9 683.80 -48.0 -47.2 -47.9 75 -99 SPO 1997 10 10 12 32 17 9.2 -9 683.80 -48.0 -47.2 -47.8 76 -99 SPO 1997 10 10 12 33 18 9.3 -9 683.80 -48.0 -47.2 -47.9 76 -99 SPO 1997 10 10 12 34 18 9.3 -9 683.80 -48.0 -47.2 -47.9 77 -99 SPO 1997 10 10 12 35 18 9.1 -9 683.70 -48.0 -47.2 -47.9 77 -99 SPO 1997 10 10 12 36 18 9.3 -9 683.80 -48.0 -47.2 -48.0 77 -99 SPO 1997 10 10 12 37 18 9.1 -9 683.80 -48.0 -47.2 -47.9 77 -99 SPO 1997 10 10 12 38 18 8.8 -9 683.80 -48.0 -47.2 -48.0 76 -99 SPO 1997 10 10 12 39 17 8.8 -9 683.80 -48.1 -47.2 -48.0 76 -99 SPO 1997 10 10 12 40 18 8.6 -9 683.80 -48.1 -47.2 -48.0 75 -99 SPO 1997 10 10 12 41 18 8.7 -9 683.90 -48.1 -47.3 -48.0 75 -99 SPO 1997 10 10 12 42 17 8.7 -9 683.80 -48.1 -47.3 -47.9 75 -99 SPO 1997 10 10 12 43 17 8.4 -9 683.80 -48.0 -47.3 -47.9 75 -99 SPO 1997 10 10 12 44 17 8.5 -9 683.80 -48.0 -47.3 -47.9 75 -99 SPO 1997 10 10 12 45 17 8.4 -9 683.80 -48.0 -47.2 -48.0 75 -99 SPO 1997 10 10 12 46 18 8.3 -9 683.80 -48.0 -47.3 -48.0 76 -99 SPO 1997 10 10 12 47 18 8.2 -9 683.80 -48.0 -47.3 -48.0 76 -99 SPO 1997 10 10 12 48 18 8.0 -9 683.80 -48.0 -47.3 -48.0 76 -99 SPO 1997 10 10 12 49 18 8.0 -9 683.90 -48.1 -47.4 -48.0 77 -99 SPO 1997 10 10 12 50 16 8.0 -9 683.90 -48.1 -47.5 -48.1 77 -99 SPO 1997 10 10 12 51 16 7.7 -9 683.90 -48.2 -47.5 -48.1 78 -99 SPO 1997 10 10 12 52 15 7.5 -9 683.90 -48.2 -47.6 -48.1 77 -99 SPO 1997 10 10 12 53 15 7.5 -9 683.90 -48.3 -47.6 -48.2 77 -99 SPO 1997 10 10 12 54 15 7.3 -9 684.00 -48.3 -47.6 -48.2 76 -99 SPO 1997 10 10 12 55 15 7.4 -9 684.00 -48.3 -47.6 -48.2 76 -99 SPO 1997 10 10 12 56 14 7.3 -9 684.00 -48.3 -47.7 -48.2 76 -99 SPO 1997 10 10 12 57 14 7.3 -9 684.00 -48.3 -47.7 -48.2 77 -99 SPO 1997 10 10 12 58 13 7.2 -9 684.10 -48.3 -47.7 -48.3 77 -99 SPO 1997 10 10 12 59 12 7.1 -9 684.10 -48.3 -47.7 -48.2 77 -99 SPO 1997 10 10 13 00 11 7.2 -9 684.10 -48.3 -47.7 -48.2 76 0 SPO 1997 10 10 13 01 10 7.2 -9 684.20 -48.3 -47.7 -48.2 76 -99 SPO 1997 10 10 13 02 9 7.0 -9 684.20 -48.4 -47.7 -48.3 77 -99 SPO 1997 10 10 13 03 9 7.0 -9 684.20 -48.3 -47.7 -48.3 75 -99 SPO 1997 10 10 13 04 9 7.1 -9 684.20 -48.3 -47.7 -48.3 75 -99 SPO 1997 10 10 13 05 8 7.3 -9 684.20 -48.4 -47.7 -48.3 75 -99 SPO 1997 10 10 13 06 9 7.5 -9 684.20 -48.4 -47.7 -48.3 75 -99 SPO 1997 10 10 13 07 11 7.5 -9 684.10 -48.4 -47.7 -48.3 74 -99 SPO 1997 10 10 13 08 12 7.6 -9 684.10 -48.4 -47.7 -48.4 75 -99 SPO 1997 10 10 13 09 12 7.6 -9 684.10 -48.4 -47.8 -48.4 75 -99 SPO 1997 10 10 13 10 13 7.6 -9 684.10 -48.4 -47.8 -48.4 75 -99 SPO 1997 10 10 13 11 13 7.5 -9 684.20 -48.5 -47.8 -48.4 76 -99 SPO 1997 10 10 13 12 14 7.6 -9 684.20 -48.4 -47.8 -48.4 75 -99 SPO 1997 10 10 13 13 13 7.5 -9 684.20 -48.5 -47.8 -48.5 75 -99 SPO 1997 10 10 13 14 13 7.5 -9 684.20 -48.5 -47.8 -48.5 75 -99 SPO 1997 10 10 13 15 14 7.4 -9 684.20 -48.5 -47.8 -48.5 75 -99 SPO 1997 10 10 13 16 14 7.8 -9 684.20 -48.5 -47.8 -48.5 74 -99 SPO 1997 10 10 13 17 14 7.6 -9 684.20 -48.5 -47.8 -48.5 74 -99 SPO 1997 10 10 13 18 14 7.8 -9 684.20 -48.6 -47.8 -48.5 74 -99 SPO 1997 10 10 13 19 15 7.7 -9 684.20 -48.6 -47.8 -48.5 74 -99 SPO 1997 10 10 13 20 16 7.9 -9 684.20 -48.5 -47.8 -48.5 74 -99 SPO 1997 10 10 13 21 16 7.6 -9 684.20 -48.5 -47.8 -48.5 74 -99 SPO 1997 10 10 13 22 16 7.8 -9 684.20 -48.6 -47.8 -48.6 75 -99 SPO 1997 10 10 13 23 17 8.0 -9 684.20 -48.6 -47.8 -48.6 74 -99 SPO 1997 10 10 13 24 17 7.9 -9 684.10 -48.6 -47.9 -48.6 74 -99 SPO 1997 10 10 13 25 18 8.1 -9 684.10 -48.6 -47.9 -48.6 74 -99 SPO 1997 10 10 13 26 17 8.2 -9 684.10 -48.6 -47.9 -48.6 74 -99 SPO 1997 10 10 13 27 17 8.1 -9 684.10 -48.6 -48.0 -48.6 74 -99 SPO 1997 10 10 13 28 18 8.2 -9 684.10 -48.7 -48.0 -48.6 74 -99 SPO 1997 10 10 13 29 19 8.6 -9 684.00 -48.7 -48.0 -48.7 74 -99 SPO 1997 10 10 13 30 19 8.8 -9 684.00 -48.7 -47.9 -48.7 74 -99 SPO 1997 10 10 13 31 19 8.9 -9 684.00 -48.7 -48.0 -48.7 74 -99 SPO 1997 10 10 13 32 18 8.5 -9 684.00 -48.7 -48.0 -48.7 74 -99 SPO 1997 10 10 13 33 17 8.1 -9 684.10 -48.8 -48.0 -48.8 74 -99 SPO 1997 10 10 13 34 16 8.2 -9 684.10 -48.8 -48.1 -48.8 75 -99 SPO 1997 10 10 13 35 16 8.0 -9 684.10 -48.8 -48.0 -48.8 75 -99 SPO 1997 10 10 13 36 16 8.1 -9 684.10 -48.8 -48.1 -48.8 75 -99 SPO 1997 10 10 13 37 16 7.8 -9 684.10 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 38 15 7.7 -9 684.10 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 39 15 7.5 -9 684.20 -48.9 -48.1 -48.8 75 -99 SPO 1997 10 10 13 40 16 7.2 -9 684.10 -48.9 -48.1 -48.9 75 -99 SPO 1997 10 10 13 41 15 7.7 -9 684.10 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 42 15 7.7 -9 684.20 -48.8 -48.1 -48.8 73 -99 SPO 1997 10 10 13 43 13 7.8 -9 684.20 -48.8 -48.2 -48.8 72 -99 SPO 1997 10 10 13 44 14 7.9 -9 684.20 -48.9 -48.2 -48.8 73 -99 SPO 1997 10 10 13 45 14 8.2 -9 684.10 -48.8 -48.2 -48.8 73 -99 SPO 1997 10 10 13 46 16 8.2 -9 684.10 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 47 16 8.3 -9 684.00 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 48 16 8.6 -9 684.00 -48.9 -48.1 -48.8 75 -99 SPO 1997 10 10 13 49 16 8.5 -9 684.00 -48.8 -48.0 -48.8 74 -99 SPO 1997 10 10 13 50 16 8.4 -9 684.00 -48.8 -48.0 -48.7 74 -99 SPO 1997 10 10 13 51 16 8.4 -9 684.00 -48.8 -48.0 -48.7 75 -99 SPO 1997 10 10 13 52 17 8.5 -9 684.00 -48.8 -48.1 -48.7 75 -99 SPO 1997 10 10 13 53 17 8.5 -9 684.00 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 54 16 8.1 -9 684.00 -48.8 -48.1 -48.8 74 -99 SPO 1997 10 10 13 55 16 8.1 -9 684.10 -48.8 -48.1 -48.8 73 -99 SPO 1997 10 10 13 56 16 8.3 -9 684.10 -48.7 -48.1 -48.7 72 -99 SPO 1997 10 10 13 57 16 8.0 -9 684.10 -48.7 -48.2 -48.7 72 -99 SPO 1997 10 10 13 58 15 7.7 -9 684.10 -48.7 -48.1 -48.7 73 -99 SPO 1997 10 10 13 59 15 7.5 -9 684.10 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 00 15 8.0 -9 684.20 -48.8 -48.2 -48.7 74 0 SPO 1997 10 10 14 01 15 7.8 -9 684.10 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 02 17 7.8 -9 684.20 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 03 16 7.7 -9 684.10 -48.8 -48.2 -48.7 75 -99 SPO 1997 10 10 14 04 17 7.8 -9 684.20 -48.8 -48.2 -48.7 75 -99 SPO 1997 10 10 14 05 17 7.6 -9 684.20 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 06 15 7.9 -9 684.20 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 07 16 7.4 -9 684.20 -48.8 -48.1 -48.7 74 -99 SPO 1997 10 10 14 08 15 7.2 -9 684.20 -48.8 -48.2 -48.7 73 -99 SPO 1997 10 10 14 09 14 7.5 -9 684.20 -48.8 -48.2 -48.7 73 -99 SPO 1997 10 10 14 10 14 7.1 -9 684.30 -48.8 -48.1 -48.7 73 -99 SPO 1997 10 10 14 11 14 7.2 -9 684.30 -48.8 -48.1 -48.7 74 -99 SPO 1997 10 10 14 12 14 7.0 -9 684.30 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 13 15 7.1 -9 684.20 -48.8 -48.2 -48.7 74 -99 SPO 1997 10 10 14 14 15 7.4 -9 684.20 -48.8 -48.1 -48.7 74 -99 SPO 1997 10 10 14 15 15 7.6 -9 684.20 -48.8 -48.1 -48.7 74 -99 SPO 1997 10 10 14 16 16 7.6 -9 684.20 -48.8 -48.1 -48.7 74 -99 SPO 1997 10 10 14 17 15 7.7 -9 684.20 -48.8 -48.1 -48.7 73 -99 SPO 1997 10 10 14 18 14 7.5 -9 684.20 -48.8 -48.1 -48.7 72 -99 SPO 1997 10 10 14 19 15 7.3 -9 684.20 -48.9 -48.2 -48.8 73 -99 SPO 1997 10 10 14 20 15 7.7 -9 684.20 -48.9 -48.2 -48.8 73 -99 SPO 1997 10 10 14 21 16 7.9 -9 684.20 -49.0 -48.2 -48.8 74 -99 SPO 1997 10 10 14 22 16 7.8 -9 684.20 -48.9 -48.2 -48.8 74 -99 SPO 1997 10 10 14 23 17 8.1 -9 684.20 -49.0 -48.2 -48.9 74 -99 SPO 1997 10 10 14 24 17 8.0 -9 684.20 -49.0 -48.2 -48.9 74 -99 SPO 1997 10 10 14 25 17 8.2 -9 684.20 -48.9 -48.2 -48.8 74 -99 SPO 1997 10 10 14 26 16 8.1 -9 684.20 -49.0 -48.2 -48.9 74 -99 SPO 1997 10 10 14 27 17 8.1 -9 684.20 -49.0 -48.1 -48.9 74 -99 SPO 1997 10 10 14 28 17 8.1 -9 684.20 -49.0 -48.1 -48.8 74 -99 SPO 1997 10 10 14 29 17 7.9 -9 684.20 -49.0 -48.1 -48.8 74 -99 SPO 1997 10 10 14 30 16 8.1 -9 684.20 -48.9 -48.1 -48.8 72 -99 SPO 1997 10 10 14 31 16 8.0 -9 684.20 -48.9 -48.1 -48.9 72 -99 SPO 1997 10 10 14 32 17 8.1 -9 684.20 -48.9 -48.1 -48.8 72 -99 SPO 1997 10 10 14 33 17 8.0 -9 684.20 -48.9 -48.1 -48.8 72 -99 SPO 1997 10 10 14 34 18 8.3 -9 684.10 -49.0 -48.1 -48.9 73 -99 SPO 1997 10 10 14 35 18 8.4 -9 684.10 -49.0 -48.0 -48.9 73 -99 SPO 1997 10 10 14 36 18 8.4 -9 684.10 -48.9 -48.0 -48.8 72 -99 SPO 1997 10 10 14 37 17 8.4 -9 684.10 -48.9 -48.1 -48.9 72 -99 SPO 1997 10 10 14 38 18 8.2 -9 684.10 -49.0 -48.2 -48.9 73 -99 SPO 1997 10 10 14 39 18 8.4 -9 684.10 -49.1 -48.2 -48.9 74 -99 SPO 1997 10 10 14 40 20 8.4 -9 684.10 -49.1 -48.2 -49.0 74 -99 SPO 1997 10 10 14 41 20 8.1 -9 684.10 -49.0 -48.2 -48.9 73 -99 SPO 1997 10 10 14 42 20 7.8 -9 684.20 -49.1 -48.3 -49.0 74 -99 SPO 1997 10 10 14 43 19 7.7 -9 684.20 -49.2 -48.3 -49.0 73 -99 SPO 1997 10 10 14 44 20 7.4 -9 684.20 -49.1 -48.3 -48.9 72 -99 SPO 1997 10 10 14 45 21 7.5 -9 684.20 -49.2 -48.3 -49.0 73 -99 SPO 1997 10 10 14 46 22 7.6 -9 684.20 -49.2 -48.3 -49.0 73 -99 SPO 1997 10 10 14 47 22 7.3 -9 684.20 -49.1 -48.4 -49.0 72 -99 SPO 1997 10 10 14 48 22 7.4 -9 684.20 -49.1 -48.4 -49.0 72 -99 SPO 1997 10 10 14 49 22 7.6 -9 684.20 -49.1 -48.3 -49.0 73 -99 SPO 1997 10 10 14 50 23 7.6 -9 684.20 -49.1 -48.3 -49.0 73 -99 SPO 1997 10 10 14 51 23 7.7 -9 684.20 -49.2 -48.3 -49.0 73 -99 SPO 1997 10 10 14 52 25 7.6 -9 684.20 -49.2 -48.3 -49.0 73 -99 SPO 1997 10 10 14 53 27 8.1 -9 684.20 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 14 54 28 8.2 -9 684.20 -49.1 -48.3 -49.0 72 -99 SPO 1997 10 10 14 55 28 7.8 -9 684.10 -49.1 -48.4 -49.0 72 -99 SPO 1997 10 10 14 56 29 7.8 -9 684.20 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 14 57 29 7.2 -9 684.20 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 14 58 29 7.1 -9 684.20 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 14 59 28 7.0 -9 684.20 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 00 27 6.7 -9 684.20 -49.2 -48.5 -49.0 73 0 SPO 1997 10 10 15 01 26 6.7 -9 684.20 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 02 26 6.9 -9 684.20 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 03 25 6.7 -9 684.20 -49.2 -48.5 -48.9 73 -99 SPO 1997 10 10 15 04 24 7.0 -9 684.20 -49.2 -48.5 -48.9 73 -99 SPO 1997 10 10 15 05 24 7.3 -9 684.20 -49.1 -48.5 -48.9 73 -99 SPO 1997 10 10 15 06 25 7.4 -9 684.20 -49.1 -48.4 -48.9 73 -99 SPO 1997 10 10 15 07 26 7.7 -9 684.20 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 15 08 25 7.9 -9 684.20 -49.1 -48.4 -49.0 73 -99 SPO 1997 10 10 15 09 24 7.7 -9 684.20 -49.1 -48.4 -49.0 73 -99 SPO 1997 10 10 15 10 24 8.1 -9 684.20 -49.1 -48.4 -49.0 73 -99 SPO 1997 10 10 15 11 25 7.8 -9 684.20 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 15 12 24 8.0 -9 684.20 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 13 23 7.8 -9 684.20 -49.1 -48.5 -49.0 73 -99 SPO 1997 10 10 15 14 23 7.6 -9 684.20 -49.2 -48.5 -48.9 73 -99 SPO 1997 10 10 15 15 23 7.6 -9 684.20 -49.2 -48.4 -48.9 73 -99 SPO 1997 10 10 15 16 24 7.9 -9 684.20 -49.1 -48.4 -48.9 73 -99 SPO 1997 10 10 15 17 24 7.9 -9 684.20 -49.1 -48.4 -49.0 74 -99 SPO 1997 10 10 15 18 24 7.9 -9 684.20 -49.2 -48.4 -49.0 74 -99 SPO 1997 10 10 15 19 24 8.0 -9 684.20 -49.2 -48.4 -48.9 73 -99 SPO 1997 10 10 15 20 24 7.8 -9 684.20 -49.0 -48.4 -48.8 72 -99 SPO 1997 10 10 15 21 23 7.9 -9 684.20 -49.1 -48.4 -48.9 72 -99 SPO 1997 10 10 15 22 22 7.7 -9 684.20 -49.1 -48.3 -48.9 72 -99 SPO 1997 10 10 15 23 22 8.2 -9 684.20 -49.0 -48.4 -48.9 71 -99 SPO 1997 10 10 15 24 22 8.0 -9 684.30 -49.1 -48.3 -48.9 72 -99 SPO 1997 10 10 15 25 23 8.2 -9 684.30 -49.1 -48.3 -48.9 72 -99 SPO 1997 10 10 15 26 23 8.0 -9 684.30 -49.1 -48.3 -48.9 73 -99 SPO 1997 10 10 15 27 25 8.0 -9 684.30 -49.1 -48.4 -48.9 74 -99 SPO 1997 10 10 15 28 26 8.1 -9 684.30 -49.1 -48.4 -49.0 73 -99 SPO 1997 10 10 15 29 26 8.1 -9 684.30 -49.1 -48.4 -49.0 73 -99 SPO 1997 10 10 15 30 27 8.0 -9 684.30 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 31 27 7.8 -9 684.30 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 15 32 27 7.9 -9 684.30 -49.2 -48.6 -49.0 73 -99 SPO 1997 10 10 15 33 28 7.7 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 34 27 7.9 -9 684.30 -49.3 -48.6 -49.1 72 -99 SPO 1997 10 10 15 35 26 8.1 -9 684.30 -49.4 -48.5 -49.1 73 -99 SPO 1997 10 10 15 36 26 7.8 -9 684.30 -49.4 -48.5 -49.1 73 -99 SPO 1997 10 10 15 37 26 7.5 -9 684.30 -49.4 -48.5 -49.1 73 -99 SPO 1997 10 10 15 38 26 7.3 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 39 26 7.3 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 40 25 7.0 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 41 26 7.0 -9 684.40 -49.4 -48.7 -49.1 73 -99 SPO 1997 10 10 15 42 26 6.9 -9 684.30 -49.4 -48.6 -49.1 73 -99 SPO 1997 10 10 15 43 26 7.0 -9 684.30 -49.4 -48.6 -49.2 73 -99 SPO 1997 10 10 15 44 25 7.5 -9 684.30 -49.4 -48.6 -49.2 72 -99 SPO 1997 10 10 15 45 24 7.7 -9 684.30 -49.3 -48.6 -49.1 71 -99 SPO 1997 10 10 15 46 24 7.9 -9 684.30 -49.3 -48.5 -49.1 69 -99 SPO 1997 10 10 15 47 23 7.9 -9 684.30 -49.3 -48.6 -49.0 71 -99 SPO 1997 10 10 15 48 23 7.6 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 49 23 7.8 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 50 22 7.6 -9 684.30 -49.3 -48.5 -49.1 73 -99 SPO 1997 10 10 15 51 22 7.8 -9 684.30 -49.3 -48.5 -49.1 73 -99 SPO 1997 10 10 15 52 22 7.9 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 53 22 7.7 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 15 54 20 8.0 -9 684.30 -49.3 -48.6 -49.0 73 -99 SPO 1997 10 10 15 55 20 7.9 -9 684.30 -49.3 -48.5 -49.0 73 -99 SPO 1997 10 10 15 56 20 8.4 -9 684.30 -49.2 -48.5 -49.0 72 -99 SPO 1997 10 10 15 57 21 8.2 -9 684.30 -49.2 -48.5 -49.1 72 -99 SPO 1997 10 10 15 58 21 8.0 -9 684.30 -49.2 -48.5 -49.1 72 -99 SPO 1997 10 10 15 59 22 8.3 -9 684.30 -49.2 -48.5 -49.0 72 -99 SPO 1997 10 10 16 00 22 8.2 -9 684.30 -49.2 -48.5 -49.0 72 0 SPO 1997 10 10 16 01 22 8.2 -9 684.30 -49.2 -48.5 -49.0 73 -99 SPO 1997 10 10 16 02 22 7.7 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 03 23 7.9 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 04 22 8.0 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 05 21 8.2 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 06 21 8.1 -9 684.30 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 07 21 8.0 -9 684.40 -49.4 -48.6 -49.1 73 -99 SPO 1997 10 10 16 08 20 8.0 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 09 20 7.7 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 10 19 7.6 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 11 20 7.9 -9 684.40 -49.3 -48.6 -49.1 73 -99 SPO 1997 10 10 16 12 20 7.7 -9 684.40 -49.4 -48.6 -49.2 73 -99 SPO 1997 10 10 16 13 20 7.5 -9 684.40 -49.4 -48.6 -49.2 73 -99 SPO 1997 10 10 16 14 20 7.8 -9 684.40 -49.4 -48.7 -49.2 73 -99 SPO 1997 10 10 16 15 20 8.3 -9 684.40 -49.3 -48.6 -49.2 72 -99 SPO 1997 10 10 16 16 20 8.5 -9 684.30 -49.3 -48.5 -49.1 72 -99 SPO 1997 10 10 16 17 19 8.2 -9 684.30 -49.3 -48.5 -49.1 72 -99 SPO 1997 10 10 16 18 18 8.4 -9 684.30 -49.3 -48.5 -49.1 73 -99 SPO 1997 10 10 16 19 18 8.2 -9 684.30 -49.3 -48.4 -49.1 72 -99 SPO 1997 10 10 16 20 18 8.3 -9 684.30 -49.3 -48.4 -49.1 72 -99 SPO 1997 10 10 16 21 18 8.5 -9 684.30 -49.3 -48.4 -49.1 71 -99 SPO 1997 10 10 16 22 17 8.5 -9 684.30 -49.3 -48.3 -49.1 71 -99 SPO 1997 10 10 16 23 17 8.4 -9 684.30 -49.3 -48.4 -49.1 71 -99 SPO 1997 10 10 16 24 17 8.3 -9 684.30 -49.4 -48.4 -49.1 73 -99 SPO 1997 10 10 16 25 17 8.2 -9 684.30 -49.4 -48.4 -49.1 73 -99 SPO 1997 10 10 16 26 19 8.3 -9 684.30 -49.3 -48.4 -49.1 72 -99 SPO 1997 10 10 16 27 19 8.3 -9 684.30 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 16 28 19 8.4 -9 684.30 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 16 29 19 8.1 -9 684.30 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 16 30 19 8.5 -9 684.30 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 16 31 19 8.8 -9 684.30 -49.2 -48.3 -49.1 72 -99 SPO 1997 10 10 16 32 19 8.6 -9 684.20 -49.2 -48.2 -49.0 71 -99 SPO 1997 10 10 16 33 19 8.8 -9 684.20 -49.2 -48.2 -49.0 71 -99 SPO 1997 10 10 16 34 18 8.9 -9 684.20 -49.2 -48.2 -49.0 70 -99 SPO 1997 10 10 16 35 18 8.6 -9 684.20 -49.2 -48.1 -49.0 70 -99 SPO 1997 10 10 16 36 18 8.8 -9 684.20 -49.2 -48.1 -49.0 71 -99 SPO 1997 10 10 16 37 17 8.5 -9 684.20 -49.1 -48.0 -49.0 71 -99 SPO 1997 10 10 16 38 17 8.0 -9 684.30 -49.1 -48.1 -48.9 71 -99 SPO 1997 10 10 16 39 17 8.1 -9 684.30 -49.1 -48.1 -48.8 72 -99 SPO 1997 10 10 16 40 16 8.1 -9 684.30 -49.0 -48.1 -48.8 72 -99 SPO 1997 10 10 16 41 16 8.4 -9 684.30 -49.0 -48.1 -48.8 73 -99 SPO 1997 10 10 16 42 17 8.4 -9 684.20 -49.0 -48.1 -48.8 74 -99 SPO 1997 10 10 16 43 18 8.9 -9 684.20 -49.0 -48.1 -48.8 74 -99 SPO 1997 10 10 16 44 19 9.0 -9 684.20 -48.9 -48.1 -48.7 73 -99 SPO 1997 10 10 16 45 19 8.5 -9 684.20 -48.9 -48.1 -48.7 72 -99 SPO 1997 10 10 16 46 20 8.6 -9 684.20 -49.0 -48.2 -48.8 73 -99 SPO 1997 10 10 16 47 20 8.3 -9 684.20 -49.0 -48.2 -48.8 73 -99 SPO 1997 10 10 16 48 20 7.9 -9 684.20 -49.1 -48.3 -48.9 74 -99 SPO 1997 10 10 16 49 21 8.0 -9 684.20 -49.0 -48.3 -48.9 73 -99 SPO 1997 10 10 16 50 21 8.3 -9 684.20 -49.0 -48.2 -48.8 73 -99 SPO 1997 10 10 16 51 21 8.5 -9 684.20 -49.1 -48.2 -48.9 74 -99 SPO 1997 10 10 16 52 22 8.6 -9 684.20 -49.1 -48.3 -48.9 74 -99 SPO 1997 10 10 16 53 22 8.5 -9 684.20 -49.1 -48.3 -48.9 74 -99 SPO 1997 10 10 16 54 23 8.4 -9 684.20 -49.1 -48.3 -49.0 74 -99 SPO 1997 10 10 16 55 24 8.3 -9 684.20 -49.1 -48.3 -48.9 74 -99 SPO 1997 10 10 16 56 24 8.2 -9 684.30 -49.2 -48.4 -48.9 73 -99 SPO 1997 10 10 16 57 25 8.3 -9 684.30 -49.2 -48.4 -49.0 73 -99 SPO 1997 10 10 16 58 25 8.1 -9 684.30 -49.2 -48.4 -48.9 73 -99 SPO 1997 10 10 16 59 25 8.1 -9 684.20 -49.2 -48.4 -49.0 72 -99 SPO 1997 10 10 17 00 25 8.4 -9 684.20 -49.2 -48.4 -49.0 71 0 SPO 1997 10 10 17 01 26 8.6 -9 684.20 -49.3 -48.4 -49.0 73 -99 SPO 1997 10 10 17 02 26 8.6 -9 684.20 -49.2 -48.4 -49.0 72 -99 SPO 1997 10 10 17 03 27 8.9 -9 684.20 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 04 27 8.8 -9 684.20 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 05 28 8.9 -9 684.10 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 06 28 8.7 -9 684.10 -49.2 -48.4 -49.1 73 -99 SPO 1997 10 10 17 07 29 8.7 -9 684.10 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 08 29 8.8 -9 684.20 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 09 28 8.3 -9 684.20 -49.3 -48.5 -49.1 73 -99 SPO 1997 10 10 17 10 29 8.0 -9 684.20 -49.3 -48.5 -49.1 72 -99 SPO 1997 10 10 17 11 28 8.5 -9 684.20 -49.2 -48.5 -49.1 71 -99 SPO 1997 10 10 17 12 27 8.6 -9 684.20 -49.2 -48.4 -49.1 71 -99 SPO 1997 10 10 17 13 27 8.4 -9 684.20 -49.3 -48.5 -49.0 72 -99 SPO 1997 10 10 17 14 26 8.6 -9 684.20 -49.2 -48.5 -49.0 72 -99 SPO 1997 10 10 17 15 27 8.6 -9 684.20 -49.3 -48.4 -49.0 73 -99 SPO 1997 10 10 17 16 26 8.6 -9 684.20 -49.3 -48.5 -49.0 74 -99 SPO 1997 10 10 17 17 26 8.7 -9 684.20 -49.3 -48.4 -49.1 74 -99 SPO 1997 10 10 17 18 25 8.7 -9 684.20 -49.3 -48.4 -49.1 74 -99 SPO 1997 10 10 17 19 26 8.6 -9 684.20 -49.3 -48.4 -49.1 74 -99 SPO 1997 10 10 17 20 26 8.7 -9 684.20 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 21 27 8.5 -9 684.20 -49.3 -48.4 -49.0 73 -99 SPO 1997 10 10 17 22 26 8.8 -9 684.20 -49.2 -48.4 -49.1 72 -99 SPO 1997 10 10 17 23 26 8.9 -9 684.20 -49.3 -48.4 -49.1 73 -99 SPO 1997 10 10 17 24 26 9.0 -9 684.20 -49.3 -48.3 -49.1 73 -99 SPO 1997 10 10 17 25 27 9.3 -9 684.10 -49.3 -48.2 -49.1 73 -99 SPO 1997 10 10 17 26 26 9.2 -9 684.10 -49.3 -48.2 -49.1 73 -99 SPO 1997 10 10 17 27 27 8.9 -9 684.10 -49.3 -48.2 -49.2 73 -99 SPO 1997 10 10 17 28 26 8.9 -9 684.20 -49.3 -48.2 -49.2 74 -99 SPO 1997 10 10 17 29 26 8.6 -9 684.20 -49.3 -48.3 -49.1 74 -99 SPO 1997 10 10 17 30 26 8.8 -9 684.20 -49.3 -48.3 -49.1 74 -99 SPO 1997 10 10 17 31 26 9.0 -9 684.20 -49.3 -48.3 -49.1 74 -99 SPO 1997 10 10 17 32 26 9.0 -9 684.20 -49.3 -48.2 -49.1 74 -99 SPO 1997 10 10 17 33 25 8.7 -9 684.30 -49.3 -48.3 -49.1 74 -99 SPO 1997 10 10 17 34 26 8.3 -9 684.30 -49.4 -48.2 -49.1 75 -99 SPO 1997 10 10 17 35 26 8.1 -9 684.30 -49.4 -48.3 -49.1 75 -99 SPO 1997 10 10 17 36 27 8.1 -9 684.30 -49.4 -48.3 -49.1 76 -99 SPO 1997 10 10 17 37 27 8.0 -9 684.30 -49.4 -48.3 -49.1 76 -99 SPO 1997 10 10 17 38 27 7.8 -9 684.40 -49.4 -48.4 -49.1 77 -99 SPO 1997 10 10 17 39 28 7.8 -9 684.40 -49.3 -48.4 -49.1 76 -99 SPO 1997 10 10 17 40 29 7.4 -9 684.40 -49.4 -48.4 -49.2 77 -99 SPO 1997 10 10 17 41 31 7.1 -9 684.40 -49.5 -48.5 -49.2 78 -99 SPO 1997 10 10 17 42 31 7.0 -9 684.40 -49.5 -48.6 -49.2 78 -99 SPO 1997 10 10 17 43 31 7.2 -9 684.40 -49.6 -48.6 -49.2 78 -99 SPO 1997 10 10 17 44 30 7.0 -9 684.40 -49.6 -48.6 -49.3 77 -99 SPO 1997 10 10 17 45 29 6.8 -9 684.40 -49.6 -48.6 -49.3 76 -99 SPO 1997 10 10 17 46 28 6.8 -9 684.40 -49.6 -48.5 -49.2 76 -99 SPO 1997 10 10 17 47 27 7.1 -9 684.40 -49.6 -48.6 -49.2 75 -99 SPO 1997 10 10 17 48 27 7.3 -9 684.40 -49.6 -48.5 -49.2 76 -99 SPO 1997 10 10 17 49 26 7.4 -9 684.40 -49.6 -48.5 -49.2 76 -99 SPO 1997 10 10 17 50 26 7.3 -9 684.40 -49.6 -48.6 -49.3 77 -99 SPO 1997 10 10 17 51 26 7.4 -9 684.30 -49.7 -48.5 -49.3 78 -99 SPO 1997 10 10 17 52 27 7.3 -9 684.30 -49.8 -48.6 -49.4 78 -99 SPO 1997 10 10 17 53 27 7.6 -9 684.30 -49.8 -48.6 -49.4 78 -99 SPO 1997 10 10 17 54 27 7.9 -9 684.30 -49.7 -48.5 -49.4 77 -99 SPO 1997 10 10 17 55 26 7.9 -9 684.30 -49.7 -48.4 -49.4 77 -99 SPO 1997 10 10 17 56 27 8.0 -9 684.30 -49.7 -48.4 -49.4 77 -99 SPO 1997 10 10 17 57 27 8.0 -9 684.30 -49.7 -48.4 -49.4 76 -99 SPO 1997 10 10 17 58 27 8.0 -9 684.30 -49.7 -48.4 -49.4 75 -99 SPO 1997 10 10 17 59 27 8.1 -9 684.30 -49.7 -48.4 -49.4 75 -99 SPO 1997 10 10 18 00 26 8.0 -9 684.30 -49.7 -48.4 -49.4 74 0 SPO 1997 10 10 18 01 26 7.9 -9 684.30 -49.7 -48.3 -49.4 74 -99 SPO 1997 10 10 18 02 25 7.8 -9 684.30 -49.7 -48.3 -49.4 74 -99 SPO 1997 10 10 18 03 24 7.9 -9 684.30 -49.6 -48.2 -49.4 73 -99 SPO 1997 10 10 18 04 24 8.1 -9 684.30 -49.6 -48.2 -49.3 73 -99 SPO 1997 10 10 18 05 24 8.4 -9 684.30 -49.6 -48.3 -49.3 74 -99 SPO 1997 10 10 18 06 24 8.2 -9 684.30 -49.6 -48.3 -49.4 75 -99 SPO 1997 10 10 18 07 24 8.4 -9 684.30 -49.6 -48.2 -49.4 76 -99 SPO 1997 10 10 18 08 24 8.5 -9 684.30 -49.7 -48.2 -49.4 77 -99 SPO 1997 10 10 18 09 24 8.9 -9 684.30 -49.7 -48.2 -49.4 76 -99 SPO 1997 10 10 18 10 24 9.0 -9 684.30 -49.7 -48.2 -49.4 76 -99 SPO 1997 10 10 18 11 24 8.7 -9 684.30 -49.7 -48.2 -49.4 76 -99 SPO 1997 10 10 18 12 24 8.5 -9 684.30 -49.7 -48.2 -49.4 75 -99 SPO 1997 10 10 18 13 24 8.2 -9 684.30 -49.6 -48.3 -49.4 75 -99 SPO 1997 10 10 18 14 24 8.2 -9 684.40 -49.7 -48.2 -49.4 76 -99 SPO 1997 10 10 18 15 23 8.1 -9 684.40 -49.7 -48.2 -49.4 77 -99 SPO 1997 10 10 18 16 24 8.2 -9 684.40 -49.6 -48.2 -49.3 76 -99 SPO 1997 10 10 18 17 24 8.2 -9 684.40 -49.6 -48.2 -49.4 76 -99 SPO 1997 10 10 18 18 24 8.3 -9 684.40 -49.6 -48.2 -49.3 76 -99 SPO 1997 10 10 18 19 24 8.2 -9 684.40 -49.6 -48.2 -49.3 77 -99 SPO 1997 10 10 18 20 25 8.5 -9 684.40 -49.4 -48.0 -49.2 74 -99 SPO 1997 10 10 18 21 24 8.3 -9 684.40 -49.4 -48.0 -49.1 74 -99 SPO 1997 10 10 18 22 26 7.7 -9 684.50 -49.2 -48.2 -49.0 73 -99 SPO 1997 10 10 18 23 27 7.4 -9 684.50 -49.3 -48.3 -49.0 74 -99 SPO 1997 10 10 18 24 28 7.0 -9 684.50 -49.4 -48.4 -49.2 76 -99 SPO 1997 10 10 18 25 29 7.0 -9 684.50 -49.6 -48.4 -49.2 79 -99 SPO 1997 10 10 18 26 30 6.7 -9 684.60 -49.8 -48.5 -49.3 80 -99 SPO 1997 10 10 18 27 31 6.4 -9 684.60 -49.8 -48.5 -49.4 80 -99 SPO 1997 10 10 18 28 33 6.1 -9 684.60 -49.8 -48.6 -49.4 80 -99 SPO 1997 10 10 18 29 33 6.0 -9 684.60 -49.8 -48.8 -49.4 79 -99 SPO 1997 10 10 18 30 35 6.2 -9 684.60 -49.9 -48.8 -49.5 80 -99 SPO 1997 10 10 18 31 34 6.0 -9 684.60 -50.0 -48.8 -49.5 80 -99 SPO 1997 10 10 18 32 36 6.0 -9 684.60 -50.0 -48.8 -49.6 79 -99 SPO 1997 10 10 18 33 38 5.9 -9 684.60 -50.1 -48.8 -49.6 79 -99 SPO 1997 10 10 18 34 38 6.0 -9 684.60 -50.2 -48.8 -49.7 79 -99 SPO 1997 10 10 18 35 39 5.8 -9 684.60 -50.2 -48.9 -49.8 77 -99 SPO 1997 10 10 18 36 41 6.0 -9 684.60 -50.3 -48.9 -49.8 77 -99 SPO 1997 10 10 18 37 42 5.8 -9 684.60 -50.3 -48.9 -49.8 76 -99 SPO 1997 10 10 18 38 42 5.8 -9 684.60 -50.4 -48.9 -49.9 77 -99 SPO 1997 10 10 18 39 42 5.7 -9 684.60 -50.4 -48.9 -49.9 77 -99 SPO 1997 10 10 18 40 42 5.4 -9 684.60 -50.5 -49.0 -50.0 78 -99 SPO 1997 10 10 18 41 42 5.5 -9 684.70 -50.5 -49.1 -50.0 78 -99 SPO 1997 10 10 18 42 42 5.1 -9 684.70 -50.6 -49.2 -50.0 79 -99 SPO 1997 10 10 18 43 43 5.0 -9 684.70 -50.7 -49.3 -50.1 79 -99 SPO 1997 10 10 18 44 45 5.2 -9 684.70 -50.6 -49.4 -50.1 79 -99 SPO 1997 10 10 18 45 47 5.3 -9 684.70 -50.6 -49.4 -50.1 77 -99 SPO 1997 10 10 18 46 50 5.1 -9 684.70 -50.7 -49.5 -50.2 78 -99 SPO 1997 10 10 18 47 51 4.8 -9 684.70 -50.8 -49.6 -50.2 78 -99 SPO 1997 10 10 18 48 54 4.6 -9 684.70 -50.9 -49.7 -50.3 79 -99 SPO 1997 10 10 18 49 58 4.0 -9 684.70 -51.0 -49.8 -50.4 79 -99 SPO 1997 10 10 18 50 64 3.2 -9 684.60 -51.6 -49.9 -50.6 84 -99 SPO 1997 10 10 18 51 68 2.8 -9 684.60 -52.0 -50.1 -50.8 87 -99 SPO 1997 10 10 18 52 75 2.9 -9 684.60 -52.2 -50.4 -50.8 87 -99 SPO 1997 10 10 18 53 79 2.8 -9 684.60 -52.2 -50.7 -50.8 85 -99 SPO 1997 10 10 18 54 81 2.8 -9 684.60 -52.1 -50.8 -50.8 83 -99 SPO 1997 10 10 18 55 70 2.5 -9 684.60 -52.2 -50.8 -50.8 82 -99 SPO 1997 10 10 18 56 60 2.4 -9 684.70 -52.4 -50.5 -50.9 84 -99 SPO 1997 10 10 18 57 56 3.3 -9 684.70 -52.5 -50.2 -50.9 83 -99 SPO 1997 10 10 18 58 58 3.7 -9 684.70 -52.1 -50.0 -50.8 77 -99 SPO 1997 10 10 18 59 59 3.7 -9 684.70 -51.6 -50.0 -50.6 73 -99 SPO 1997 10 10 19 00 61 3.3 -9 684.70 -51.6 -50.1 -50.5 75 0 SPO 1997 10 10 19 01 61 3.3 -9 684.70 -51.7 -50.2 -50.5 76 -99 SPO 1997 10 10 19 02 58 3.1 -9 684.70 -52.0 -50.2 -50.4 79 -99 SPO 1997 10 10 19 03 55 3.2 -9 684.70 -52.1 -50.2 -50.4 81 -99 SPO 1997 10 10 19 04 54 3.4 -9 684.70 -51.8 -50.1 -50.5 78 -99 SPO 1997 10 10 19 05 53 3.6 -9 684.70 -51.6 -50.0 -50.6 77 -99 SPO 1997 10 10 19 06 54 3.8 -9 684.70 -51.6 -50.0 -50.6 79 -99 SPO 1997 10 10 19 07 55 3.9 -9 684.70 -51.6 -50.0 -50.7 80 -99 SPO 1997 10 10 19 08 56 4.0 -9 684.70 -51.6 -49.9 -50.7 81 -99 SPO 1997 10 10 19 09 58 4.3 -9 684.70 -51.6 -49.8 -50.8 81 -99 SPO 1997 10 10 19 10 61 4.4 -9 684.70 -51.8 -49.8 -50.9 83 -99 SPO 1997 10 10 19 11 64 4.4 -9 684.70 -51.9 -49.9 -51.0 84 -99 SPO 1997 10 10 19 12 63 4.4 -9 684.70 -52.1 -49.9 -51.2 85 -99 SPO 1997 10 10 19 13 60 4.6 -9 684.70 -52.3 -49.8 -51.4 85 -99 SPO 1997 10 10 19 14 56 4.9 -9 684.70 -52.3 -49.8 -51.5 83 -99 SPO 1997 10 10 19 15 53 5.0 -9 684.70 -52.3 -49.8 -51.5 82 -99 SPO 1997 10 10 19 16 49 5.1 -9 684.70 -52.2 -49.7 -51.4 80 -99 SPO 1997 10 10 19 17 44 5.5 -9 684.70 -52.0 -49.4 -51.3 78 -99 SPO 1997 10 10 19 18 39 5.4 -9 684.70 -51.7 -49.2 -51.0 75 -99 SPO 1997 10 10 19 19 38 5.3 -9 684.70 -51.4 -49.2 -50.7 73 -99 SPO 1997 10 10 19 20 38 5.5 -9 684.70 -51.4 -49.2 -50.8 75 -99 SPO 1997 10 10 19 21 41 5.7 -9 684.70 -51.3 -49.0 -50.7 75 -99 SPO 1997 10 10 19 22 42 5.4 -9 684.70 -51.2 -49.2 -50.6 75 -99 SPO 1997 10 10 19 23 46 4.9 -9 684.70 -51.2 -49.4 -50.6 76 -99 SPO 1997 10 10 19 24 51 4.4 -9 684.70 -51.4 -49.6 -50.8 77 -99 SPO 1997 10 10 19 25 56 4.0 -9 684.70 -51.6 -50.0 -50.9 79 -99 SPO 1997 10 10 19 26 57 3.9 -9 684.70 -51.8 -50.2 -51.0 80 -99 SPO 1997 10 10 19 27 56 4.0 -9 684.70 -52.2 -50.3 -51.0 83 -99 SPO 1997 10 10 19 28 56 4.4 -9 684.70 -52.5 -50.3 -51.1 85 -99 SPO 1997 10 10 19 29 55 4.3 -9 684.70 -52.0 -50.3 -51.1 79 -99 SPO 1997 10 10 19 30 53 4.2 -9 684.70 -51.8 -50.5 -51.1 78 -99 SPO 1997 10 10 19 31 51 4.5 -9 684.70 -52.0 -50.5 -51.2 80 -99 SPO 1997 10 10 19 32 44 4.7 -9 684.70 -52.0 -50.4 -51.3 80 -99 SPO 1997 10 10 19 33 44 5.2 -9 684.70 -52.0 -50.0 -51.3 80 -99 SPO 1997 10 10 19 34 41 5.8 -9 684.70 -52.1 -49.6 -51.4 81 -99 SPO 1997 10 10 19 35 40 6.2 -9 684.60 -52.1 -49.4 -51.5 79 -99 SPO 1997 10 10 19 36 40 6.4 -9 684.60 -52.1 -49.1 -51.5 79 -99 SPO 1997 10 10 19 37 40 6.4 -9 684.60 -52.1 -49.2 -51.5 77 -99 SPO 1997 10 10 19 38 40 6.7 -9 684.60 -52.1 -49.2 -51.5 76 -99 SPO 1997 10 10 19 39 41 7.0 -9 684.60 -52.0 -49.1 -51.4 76 -99 SPO 1997 10 10 19 40 40 7.1 -9 684.60 -52.0 -49.0 -51.4 76 -99 SPO 1997 10 10 19 41 40 7.1 -9 684.60 -51.9 -48.9 -51.4 75 -99 SPO 1997 10 10 19 42 39 7.0 -9 684.50 -51.9 -49.0 -51.4 75 -99 SPO 1997 10 10 19 43 40 7.5 -9 684.50 -51.9 -48.8 -51.4 75 -99 SPO 1997 10 10 19 44 39 7.4 -9 684.50 -51.8 -48.7 -51.3 75 -99 SPO 1997 10 10 19 45 39 7.7 -9 684.50 -51.8 -48.6 -51.3 75 -99 SPO 1997 10 10 19 46 38 7.5 -9 684.50 -51.7 -48.6 -51.3 74 -99 SPO 1997 10 10 19 47 39 7.7 -9 684.50 -51.7 -48.7 -51.3 74 -99 SPO 1997 10 10 19 48 38 7.7 -9 684.50 -51.7 -48.6 -51.3 75 -99 SPO 1997 10 10 19 49 38 7.7 -9 684.50 -51.7 -48.6 -51.3 75 -99 SPO 1997 10 10 19 50 39 7.5 -9 684.50 -51.7 -48.5 -51.3 74 -99 SPO 1997 10 10 19 51 40 7.4 -9 684.50 -51.7 -48.6 -51.3 74 -99 SPO 1997 10 10 19 52 40 7.3 -9 684.50 -51.7 -48.8 -51.3 74 -99 SPO 1997 10 10 19 53 41 7.3 -9 684.50 -51.8 -48.7 -51.4 75 -99 SPO 1997 10 10 19 54 41 7.3 -9 684.50 -51.8 -48.6 -51.4 76 -99 SPO 1997 10 10 19 55 41 7.2 -9 684.50 -51.8 -48.6 -51.4 76 -99 SPO 1997 10 10 19 56 41 7.2 -9 684.60 -51.9 -48.7 -51.5 77 -99 SPO 1997 10 10 19 57 40 7.2 -9 684.60 -51.9 -48.8 -51.5 77 -99 SPO 1997 10 10 19 58 39 7.1 -9 684.60 -52.0 -48.6 -51.6 78 -99 SPO 1997 10 10 19 59 39 7.1 -9 684.60 -52.1 -48.6 -51.6 80 -99 SPO 1997 10 10 20 00 38 7.1 -9 684.60 -52.0 -48.6 -51.6 78 0 SPO 1997 10 10 20 01 38 7.2 -9 684.60 -52.0 -48.6 -51.5 78 -99 SPO 1997 10 10 20 02 39 7.3 -9 684.60 -51.9 -48.5 -51.4 77 -99 SPO 1997 10 10 20 03 39 7.3 -9 684.60 -51.8 -48.5 -51.4 76 -99 SPO 1997 10 10 20 04 39 7.0 -9 684.60 -52.0 -48.5 -51.5 78 -99 SPO 1997 10 10 20 05 40 6.9 -9 684.60 -52.0 -48.7 -51.5 79 -99 SPO 1997 10 10 20 06 41 6.8 -9 684.60 -52.0 -48.8 -51.5 79 -99 SPO 1997 10 10 20 07 42 6.6 -9 684.60 -52.1 -48.9 -51.6 81 -99 SPO 1997 10 10 20 08 42 6.6 -9 684.70 -52.1 -48.9 -51.6 81 -99 SPO 1997 10 10 20 09 42 6.4 -9 684.70 -52.1 -48.9 -51.6 81 -99 SPO 1997 10 10 20 10 42 6.4 -9 684.70 -52.2 -48.9 -51.6 82 -99 SPO 1997 10 10 20 11 44 6.3 -9 684.70 -52.2 -48.9 -51.6 82 -99 SPO 1997 10 10 20 12 43 5.9 -9 684.70 -52.1 -49.1 -51.6 81 -99 SPO 1997 10 10 20 13 44 5.7 -9 684.70 -52.2 -49.3 -51.6 80 -99 SPO 1997 10 10 20 14 45 5.1 -9 684.70 -52.2 -49.6 -51.6 80 -99 SPO 1997 10 10 20 15 44 5.3 -9 684.60 -52.2 -49.8 -51.6 80 -99 SPO 1997 10 10 20 16 43 5.7 -9 684.60 -52.3 -49.7 -51.6 81 -99 SPO 1997 10 10 20 17 40 6.1 -9 684.60 -52.2 -49.6 -51.6 80 -99 SPO 1997 10 10 20 18 37 7.0 -9 684.60 -52.0 -49.1 -51.4 78 -99 SPO 1997 10 10 20 19 37 7.7 -9 684.60 -51.9 -48.4 -51.3 78 -99 SPO 1997 10 10 20 20 36 7.9 -9 684.60 -51.7 -48.0 -51.2 77 -99 SPO 1997 10 10 20 21 36 8.0 -9 684.60 -51.6 -48.0 -51.1 77 -99 SPO 1997 10 10 20 22 36 7.8 -9 684.60 -51.5 -48.2 -51.1 77 -99 SPO 1997 10 10 20 23 37 7.7 -9 684.60 -51.5 -48.2 -51.1 79 -99 SPO 1997 10 10 20 24 39 7.3 -9 684.70 -51.6 -48.2 -51.2 80 -99 SPO 1997 10 10 20 25 40 6.8 -9 684.70 -51.6 -48.4 -51.2 80 -99 SPO 1997 10 10 20 26 42 6.4 -9 684.70 -51.7 -48.7 -51.2 81 -99 SPO 1997 10 10 20 27 44 5.9 -9 684.70 -51.7 -48.9 -51.3 80 -99 SPO 1997 10 10 20 28 45 5.5 -9 684.80 -51.8 -49.1 -51.4 81 -99 SPO 1997 10 10 20 29 46 5.2 -9 684.80 -51.9 -49.4 -51.4 82 -99 SPO 1997 10 10 20 30 46 5.2 -9 684.80 -51.9 -49.6 -51.4 81 -99 SPO 1997 10 10 20 31 47 5.4 -9 684.80 -52.0 -49.5 -51.4 82 -99 SPO 1997 10 10 20 32 47 5.2 -9 684.80 -51.9 -49.5 -51.4 81 -99 SPO 1997 10 10 20 33 49 5.5 -9 684.80 -51.9 -49.6 -51.4 81 -99 SPO 1997 10 10 20 34 48 5.5 -9 684.80 -52.0 -49.6 -51.5 83 -99 SPO 1997 10 10 20 35 48 5.4 -9 684.80 -52.0 -49.7 -51.5 83 -99 SPO 1997 10 10 20 36 48 5.5 -9 684.70 -52.0 -49.7 -51.6 83 -99 SPO 1997 10 10 20 37 48 5.4 -9 684.70 -52.1 -49.6 -51.6 84 -99 SPO 1997 10 10 20 38 47 5.6 -9 684.70 -52.1 -49.6 -51.6 83 -99 SPO 1997 10 10 20 39 46 5.6 -9 684.70 -52.2 -49.6 -51.7 84 -99 SPO 1997 10 10 20 40 45 5.3 -9 684.70 -52.1 -49.6 -51.6 82 -99 SPO 1997 10 10 20 41 46 5.3 -9 684.70 -52.2 -49.8 -51.7 83 -99 SPO 1997 10 10 20 42 46 5.3 -9 684.70 -52.2 -49.7 -51.7 83 -99 SPO 1997 10 10 20 43 48 5.0 -9 684.70 -52.1 -49.6 -51.7 82 -99 SPO 1997 10 10 20 44 47 4.9 -9 684.70 -52.3 -49.8 -51.8 84 -99 SPO 1997 10 10 20 45 47 4.8 -9 684.80 -52.4 -49.8 -51.9 85 -99 SPO 1997 10 10 20 46 46 4.9 -9 684.80 -52.4 -49.8 -51.9 84 -99 SPO 1997 10 10 20 47 45 5.0 -9 684.80 -52.4 -49.8 -51.9 84 -99 SPO 1997 10 10 20 48 44 5.2 -9 684.80 -52.3 -49.8 -51.8 82 -99 SPO 1997 10 10 20 49 42 5.7 -9 684.70 -52.2 -49.6 -51.8 81 -99 SPO 1997 10 10 20 50 41 6.1 -9 684.70 -52.1 -49.6 -51.7 80 -99 SPO 1997 10 10 20 51 42 6.0 -9 684.70 -52.1 -49.3 -51.6 80 -99 SPO 1997 10 10 20 52 43 5.8 -9 684.70 -52.1 -49.4 -51.7 80 -99 SPO 1997 10 10 20 53 44 5.9 -9 684.70 -52.2 -49.5 -51.8 81 -99 SPO 1997 10 10 20 54 47 5.8 -9 684.60 -52.3 -49.5 -52.0 82 -99 SPO 1997 10 10 20 55 48 5.6 -9 684.70 -52.4 -49.6 -52.0 83 -99 SPO 1997 10 10 20 56 50 5.4 -9 684.70 -52.5 -50.0 -52.2 83 -99 SPO 1997 10 10 20 57 53 5.3 -9 684.70 -52.6 -50.2 -52.2 84 -99 SPO 1997 10 10 20 58 54 5.4 -9 684.70 -52.8 -50.2 -52.4 86 -99 SPO 1997 10 10 20 59 53 5.6 -9 684.80 -52.9 -50.0 -52.5 86 -99 SPO 1997 10 10 21 00 52 5.7 -9 684.80 -52.9 -49.8 -52.5 85 0 SPO 1997 10 10 21 01 50 6.1 -9 684.80 -52.8 -49.6 -52.4 82 -99 SPO 1997 10 10 21 02 48 6.6 -9 684.70 -52.8 -49.4 -52.4 81 -99 SPO 1997 10 10 21 03 47 6.9 -9 684.70 -52.7 -49.3 -52.3 79 -99 SPO 1997 10 10 21 04 45 6.8 -9 684.70 -52.6 -49.2 -52.3 78 -99 SPO 1997 10 10 21 05 45 7.0 -9 684.70 -52.6 -49.0 -52.3 77 -99 SPO 1997 10 10 21 06 44 6.9 -9 684.70 -52.6 -48.9 -52.3 77 -99 SPO 1997 10 10 21 07 43 6.8 -9 684.70 -52.7 -49.1 -52.4 79 -99 SPO 1997 10 10 21 08 44 6.7 -9 684.70 -52.8 -49.1 -52.5 80 -99 SPO 1997 10 10 21 09 44 6.5 -9 684.70 -52.9 -49.2 -52.5 81 -99 SPO 1997 10 10 21 10 45 6.5 -9 684.70 -53.0 -49.3 -52.6 81 -99 SPO 1997 10 10 21 11 45 6.2 -9 684.80 -52.9 -49.3 -52.6 80 -99 SPO 1997 10 10 21 12 45 5.7 -9 684.80 -52.8 -49.5 -52.5 79 -99 SPO 1997 10 10 21 13 45 5.3 -9 684.80 -52.8 -49.7 -52.5 78 -99 SPO 1997 10 10 21 14 44 5.4 -9 684.80 -52.8 -49.7 -52.5 78 -99 SPO 1997 10 10 21 15 44 5.6 -9 684.80 -52.8 -49.5 -52.4 78 -99 SPO 1997 10 10 21 16 44 5.7 -9 684.80 -52.7 -49.3 -52.4 77 -99 SPO 1997 10 10 21 17 45 5.6 -9 684.80 -52.7 -49.1 -52.4 77 -99 SPO 1997 10 10 21 18 46 5.2 -9 684.80 -52.8 -49.0 -52.4 80 -99 SPO 1997 10 10 21 19 48 5.1 -9 684.90 -52.8 -49.2 -52.5 80 -99 SPO 1997 10 10 21 20 51 5.2 -9 684.90 -52.9 -49.2 -52.6 82 -99 SPO 1997 10 10 21 21 51 4.8 -9 684.90 -53.0 -49.4 -52.6 83 -99 SPO 1997 10 10 21 22 53 5.1 -9 684.90 -53.1 -49.6 -52.7 84 -99 SPO 1997 10 10 21 23 53 5.3 -9 684.90 -53.2 -49.6 -52.8 84 -99 SPO 1997 10 10 21 24 51 5.3 -9 684.90 -53.3 -49.5 -52.9 85 -99 SPO 1997 10 10 21 25 50 5.2 -9 684.90 -53.3 -49.7 -52.9 84 -99 SPO 1997 10 10 21 26 49 5.5 -9 684.90 -53.4 -49.6 -52.9 84 -99 SPO 1997 10 10 21 27 48 5.6 -9 684.90 -53.4 -49.5 -52.9 84 -99 SPO 1997 10 10 21 28 46 6.0 -9 684.90 -53.2 -49.4 -52.8 80 -99 SPO 1997 10 10 21 29 48 5.9 -9 684.90 -52.8 -49.2 -52.5 76 -99 SPO 1997 10 10 21 30 47 5.8 -9 684.90 -52.7 -49.2 -52.4 77 -99 SPO 1997 10 10 21 31 48 5.4 -9 684.90 -52.9 -49.5 -52.6 80 -99 SPO 1997 10 10 21 32 47 5.1 -9 684.90 -52.9 -49.5 -52.6 81 -99 SPO 1997 10 10 21 33 46 4.5 -9 684.90 -52.9 -49.7 -52.6 82 -99 SPO 1997 10 10 21 34 46 4.7 -9 685.00 -53.1 -49.7 -52.7 85 -99 SPO 1997 10 10 21 35 47 5.3 -9 685.00 -52.9 -49.5 -52.6 83 -99 SPO 1997 10 10 21 36 46 5.6 -9 685.00 -52.7 -49.3 -52.4 81 -99 SPO 1997 10 10 21 37 47 5.8 -9 685.00 -52.6 -49.2 -52.2 80 -99 SPO 1997 10 10 21 38 45 5.8 -9 685.00 -52.5 -49.0 -52.2 80 -99 SPO 1997 10 10 21 39 44 6.0 -9 685.00 -52.5 -49.0 -52.2 80 -99 SPO 1997 10 10 21 40 42 5.8 -9 685.00 -52.4 -48.9 -52.2 79 -99 SPO 1997 10 10 21 41 42 5.8 -9 685.00 -52.4 -48.8 -52.1 80 -99 SPO 1997 10 10 21 42 43 5.5 -9 685.00 -52.4 -48.8 -52.1 80 -99 SPO 1997 10 10 21 43 46 5.3 -9 685.00 -52.5 -49.0 -52.1 83 -99 SPO 1997 10 10 21 44 49 5.2 -9 685.00 -52.6 -49.2 -52.2 84 -99 SPO 1997 10 10 21 45 51 5.2 -9 685.00 -52.8 -49.4 -52.4 86 -99 SPO 1997 10 10 21 46 53 5.2 -9 685.00 -53.0 -49.6 -52.5 87 -99 SPO 1997 10 10 21 47 52 5.2 -9 685.00 -53.0 -49.6 -52.6 86 -99 SPO 1997 10 10 21 48 50 5.4 -9 685.00 -53.0 -49.4 -52.6 85 -99 SPO 1997 10 10 21 49 48 5.2 -9 684.90 -52.9 -49.6 -52.5 83 -99 SPO 1997 10 10 21 50 49 4.9 -9 684.90 -52.8 -49.7 -52.5 81 -99 SPO 1997 10 10 21 51 49 4.7 -9 684.90 -52.9 -49.9 -52.6 82 -99 SPO 1997 10 10 21 52 49 4.8 -9 684.90 -53.1 -49.9 -52.8 84 -99 SPO 1997 10 10 21 53 48 5.0 -9 684.90 -53.4 -49.9 -53.0 87 -99 SPO 1997 10 10 21 54 47 5.2 -9 684.90 -53.7 -49.6 -53.3 89 -99 SPO 1997 10 10 21 55 46 5.4 -9 684.90 -53.8 -49.5 -53.4 88 -99 SPO 1997 10 10 21 56 46 5.8 -9 684.90 -53.6 -49.6 -53.0 86 -99 SPO 1997 10 10 21 57 47 6.6 -9 684.80 -52.8 -49.3 -52.2 76 -99 SPO 1997 10 10 21 58 45 6.8 -9 684.80 -52.5 -49.1 -52.0 75 -99 SPO 1997 10 10 21 59 46 7.1 -9 684.80 -52.6 -49.0 -52.2 77 -99 SPO 1997 10 10 22 00 44 7.3 -9 684.80 -52.7 -48.8 -52.3 79 0 SPO 1997 10 10 22 01 44 7.3 -9 684.80 -52.7 -49.0 -52.2 80 -99 SPO 1997 10 10 22 02 44 7.3 -9 684.80 -52.6 -49.0 -52.2 79 -99 SPO 1997 10 10 22 03 44 7.3 -9 684.80 -52.6 -49.0 -52.1 79 -99 SPO 1997 10 10 22 04 44 7.1 -9 684.80 -52.5 -49.1 -52.1 78 -99 SPO 1997 10 10 22 05 44 6.9 -9 684.80 -52.5 -49.0 -52.0 78 -99 SPO 1997 10 10 22 06 45 6.2 -9 684.80 -52.5 -49.2 -52.0 79 -99 SPO 1997 10 10 22 07 44 5.4 -9 684.90 -52.8 -49.3 -52.2 82 -99 SPO 1997 10 10 22 08 44 5.5 -9 684.90 -52.9 -49.3 -52.3 83 -99 SPO 1997 10 10 22 09 44 5.9 -9 684.90 -52.8 -49.3 -52.1 82 -99 SPO 1997 10 10 22 10 44 6.1 -9 685.00 -52.4 -49.3 -51.8 78 -99 SPO 1997 10 10 22 11 46 5.5 -9 685.00 -52.2 -49.3 -51.6 76 -99 SPO 1997 10 10 22 12 47 5.3 -9 685.00 -52.4 -49.3 -51.9 79 -99 SPO 1997 10 10 22 13 48 5.2 -9 685.00 -52.7 -49.4 -52.2 82 -99 SPO 1997 10 10 22 14 47 5.3 -9 685.00 -52.9 -49.4 -52.2 83 -99 SPO 1997 10 10 22 15 48 5.3 -9 685.00 -52.8 -49.5 -52.2 81 -99 SPO 1997 10 10 22 16 48 5.3 -9 685.00 -52.8 -49.6 -52.0 81 -99 SPO 1997 10 10 22 17 47 5.4 -9 685.00 -52.7 -49.5 -52.0 80 -99 SPO 1997 10 10 22 18 46 5.4 -9 685.00 -52.6 -49.5 -51.8 79 -99 SPO 1997 10 10 22 19 46 5.4 -9 685.00 -52.4 -49.3 -51.8 78 -99 SPO 1997 10 10 22 20 46 5.4 -9 685.00 -52.4 -49.5 -51.8 79 -99 SPO 1997 10 10 22 21 46 5.6 -9 685.00 -52.5 -49.4 -51.8 81 -99 SPO 1997 10 10 22 22 46 5.5 -9 685.00 -52.6 -49.4 -52.0 83 -99 SPO 1997 10 10 22 23 49 5.5 -9 685.00 -52.7 -49.5 -52.1 84 -99 SPO 1997 10 10 22 24 49 5.3 -9 685.00 -52.9 -49.6 -52.2 85 -99 SPO 1997 10 10 22 25 49 5.0 -9 685.00 -53.1 -49.6 -52.4 87 -99 SPO 1997 10 10 22 26 50 4.9 -9 685.00 -53.3 -49.6 -52.6 87 -99 SPO 1997 10 10 22 27 50 4.9 -9 685.00 -53.4 -49.6 -52.6 86 -99 SPO 1997 10 10 22 28 51 5.2 -9 685.00 -53.4 -49.4 -52.5 84 -99 SPO 1997 10 10 22 29 49 5.5 -9 685.00 -53.2 -49.2 -52.5 82 -99 SPO 1997 10 10 22 30 48 5.5 -9 685.00 -53.1 -49.2 -52.4 81 -99 SPO 1997 10 10 22 31 51 5.1 -9 685.00 -53.0 -49.2 -52.3 80 -99 SPO 1997 10 10 22 32 51 4.7 -9 685.00 -53.0 -49.4 -52.3 80 -99 SPO 1997 10 10 22 33 51 4.3 -9 685.00 -53.3 -50.0 -52.5 81 -99 SPO 1997 10 10 22 34 52 5.2 -9 685.00 -53.5 -49.9 -52.7 83 -99 SPO 1997 10 10 22 35 52 5.9 -9 685.00 -53.2 -49.8 -52.4 80 -99 SPO 1997 10 10 22 36 53 6.3 -9 684.90 -53.0 -49.8 -52.3 78 -99 SPO 1997 10 10 22 37 53 6.6 -9 684.90 -52.9 -49.6 -52.3 79 -99 SPO 1997 10 10 22 38 54 6.9 -9 684.90 -52.9 -49.4 -52.4 79 -99 SPO 1997 10 10 22 39 53 7.0 -9 684.90 -53.0 -49.2 -52.6 80 -99 SPO 1997 10 10 22 40 52 7.2 -9 684.80 -53.0 -49.1 -52.8 80 -99 SPO 1997 10 10 22 41 52 7.4 -9 684.80 -53.1 -49.0 -52.8 81 -99 SPO 1997 10 10 22 42 51 7.4 -9 684.80 -53.0 -48.7 -52.8 80 -99 SPO 1997 10 10 22 43 50 7.2 -9 684.80 -53.1 -48.8 -52.8 81 -99 SPO 1997 10 10 22 44 51 6.9 -9 684.80 -53.1 -48.9 -52.9 79 -99 SPO 1997 10 10 22 45 52 6.9 -9 684.80 -53.2 -48.6 -53.0 80 -99 SPO 1997 10 10 22 46 53 6.9 -9 684.80 -53.4 -48.6 -53.1 81 -99 SPO 1997 10 10 22 47 53 7.0 -9 684.70 -53.5 -48.7 -53.2 81 -99 SPO 1997 10 10 22 48 53 6.8 -9 684.70 -53.6 -48.9 -53.2 81 -99 SPO 1997 10 10 22 49 51 6.7 -9 684.70 -53.8 -49.0 -53.3 81 -99 SPO 1997 10 10 22 50 50 6.5 -9 684.70 -53.8 -49.1 -53.3 79 -99 SPO 1997 10 10 22 51 50 6.5 -9 684.70 -53.8 -49.3 -53.3 79 -99 SPO 1997 10 10 22 52 51 6.6 -9 684.70 -53.8 -49.1 -53.2 78 -99 SPO 1997 10 10 22 53 52 6.6 -9 684.70 -53.6 -49.1 -53.1 75 -99 SPO 1997 10 10 22 54 52 6.3 -9 684.70 -53.6 -49.2 -53.0 75 -99 SPO 1997 10 10 22 55 53 7.1 -9 684.70 -53.6 -49.0 -53.0 75 -99 SPO 1997 10 10 22 56 53 6.5 -9 684.70 -53.4 -49.0 -53.0 74 -99 SPO 1997 10 10 22 57 53 6.0 -9 684.80 -53.4 -49.3 -53.0 75 -99 SPO 1997 10 10 22 58 52 5.9 -9 684.80 -53.5 -49.4 -53.0 76 -99 SPO 1997 10 10 22 59 52 5.8 -9 684.80 -53.4 -49.5 -53.0 76 -99 SPO 1997 10 10 23 00 52 5.7 -9 684.80 -53.5 -49.4 -53.1 78 0 SPO 1997 10 10 23 01 52 5.7 -9 684.80 -53.5 -49.3 -53.2 78 -99 SPO 1997 10 10 23 02 53 5.2 -9 684.80 -53.4 -49.4 -53.2 77 -99 SPO 1997 10 10 23 03 54 5.1 -9 684.80 -53.4 -49.3 -53.2 77 -99 SPO 1997 10 10 23 04 53 4.8 -9 684.90 -53.4 -49.2 -53.2 77 -99 SPO 1997 10 10 23 05 52 4.1 -9 685.00 -53.3 -49.6 -53.1 77 -99 SPO 1997 10 10 23 06 53 4.3 -9 685.00 -53.2 -50.2 -53.1 77 -99 SPO 1997 10 10 23 07 57 5.1 -9 685.00 -53.1 -49.8 -52.9 77 -99 SPO 1997 10 10 23 08 58 5.6 -9 685.00 -52.8 -49.3 -52.7 75 -99 SPO 1997 10 10 23 09 58 4.4 -9 685.00 -52.7 -50.0 -52.4 77 -99 SPO 1997 10 10 23 10 66 4.0 -9 685.00 -52.7 -50.4 -52.3 79 -99 SPO 1997 10 10 23 11 69 4.5 -9 685.00 -52.9 -50.7 -52.4 82 -99 SPO 1997 10 10 23 12 63 4.4 -9 685.00 -53.0 -50.4 -52.5 84 -99 SPO 1997 10 10 23 13 57 4.5 -9 684.90 -53.2 -50.6 -52.7 86 -99 SPO 1997 10 10 23 14 56 4.8 -9 684.90 -53.3 -50.4 -52.8 86 -99 SPO 1997 10 10 23 15 56 5.1 -9 684.90 -53.3 -50.1 -52.8 85 -99 SPO 1997 10 10 23 16 55 5.2 -9 684.90 -53.3 -50.0 -52.8 85 -99 SPO 1997 10 10 23 17 56 5.4 -9 684.90 -53.4 -50.0 -52.8 84 -99 SPO 1997 10 10 23 18 58 5.5 -9 684.90 -53.4 -49.8 -52.9 84 -99 SPO 1997 10 10 23 19 58 5.1 -9 684.90 -53.4 -50.0 -53.0 82 -99 SPO 1997 10 10 23 20 60 5.0 -9 684.90 -53.5 -50.2 -53.0 82 -99 SPO 1997 10 10 23 21 63 4.9 -9 684.90 -53.6 -50.2 -53.0 82 -99 SPO 1997 10 10 23 22 65 4.6 -9 684.90 -53.6 -50.6 -53.1 81 -99 SPO 1997 10 10 23 23 68 4.4 -9 685.00 -53.6 -50.8 -53.0 81 -99 SPO 1997 10 10 23 24 69 4.2 -9 685.00 -53.7 -50.8 -53.0 81 -99 SPO 1997 10 10 23 25 70 4.1 -9 685.00 -53.8 -51.2 -53.1 82 -99 SPO 1997 10 10 23 26 70 4.3 -9 685.00 -53.9 -51.2 -53.1 82 -99 SPO 1997 10 10 23 27 70 4.1 -9 685.00 -54.0 -51.3 -53.1 81 -99 SPO 1997 10 10 23 28 68 4.3 -9 685.00 -54.0 -51.4 -53.2 80 -99 SPO 1997 10 10 23 29 70 4.3 -9 685.00 -54.0 -51.1 -53.2 79 -99 SPO 1997 10 10 23 30 70 4.3 -9 684.90 -54.0 -51.3 -53.4 79 -99 SPO 1997 10 10 23 31 73 4.5 -9 685.00 -54.0 -51.2 -53.6 79 -99 SPO 1997 10 10 23 32 74 4.7 -9 685.00 -54.1 -51.4 -53.6 80 -99 SPO 1997 10 10 23 33 74 4.4 -9 685.00 -54.1 -51.4 -53.6 80 -99 SPO 1997 10 10 23 34 74 4.2 -9 685.00 -54.1 -51.7 -53.4 80 -99 SPO 1997 10 10 23 35 77 4.5 -9 685.00 -54.1 -51.3 -53.2 80 -99 SPO 1997 10 10 23 36 78 4.2 -9 685.00 -54.1 -51.0 -53.2 80 -99 SPO 1997 10 10 23 37 80 3.5 -9 685.00 -54.1 -51.6 -53.1 80 -99 SPO 1997 10 10 23 38 81 3.3 -9 685.00 -54.2 -52.0 -53.0 82 -99 SPO 1997 10 10 23 39 83 3.4 -9 685.10 -54.2 -52.1 -52.9 81 -99 SPO 1997 10 10 23 40 85 3.5 -9 685.10 -54.2 -51.9 -53.0 81 -99 SPO 1997 10 10 23 41 84 3.2 -9 685.10 -54.1 -51.8 -53.0 80 -99 SPO 1997 10 10 23 42 85 3.5 -9 685.10 -54.1 -51.7 -53.0 80 -99 SPO 1997 10 10 23 43 88 3.6 -9 685.10 -54.0 -51.5 -53.0 81 -99 SPO 1997 10 10 23 44 88 3.7 -9 685.10 -53.9 -51.6 -53.1 81 -99 SPO 1997 10 10 23 45 87 3.9 -9 685.10 -54.0 -51.6 -53.0 83 -99 SPO 1997 10 10 23 46 85 4.0 -9 685.10 -54.0 -51.4 -53.0 84 -99 SPO 1997 10 10 23 47 81 4.3 -9 685.10 -53.9 -51.3 -52.8 83 -99 SPO 1997 10 10 23 48 75 4.7 -9 685.10 -53.6 -51.4 -52.6 81 -99 SPO 1997 10 10 23 49 70 4.7 -9 685.10 -53.1 -51.3 -52.4 76 -99 SPO 1997 10 10 23 50 73 5.1 -9 685.10 -52.9 -50.8 -52.3 76 -99 SPO 1997 10 10 23 51 69 4.7 -9 685.10 -53.0 -51.2 -52.4 78 -99 SPO 1997 10 10 23 52 75 4.4 -9 685.10 -53.2 -51.1 -52.5 82 -99 SPO 1997 10 10 23 53 76 4.4 -9 685.10 -53.3 -51.1 -52.5 83 -99 SPO 1997 10 10 23 54 83 4.1 -9 685.10 -53.5 -51.0 -52.5 85 -99 SPO 1997 10 10 23 55 84 3.4 -9 685.10 -53.6 -51.2 -52.5 83 -99 SPO 1997 10 10 23 56 90 3.3 -9 685.20 -53.8 -51.7 -52.6 83 -99 SPO 1997 10 10 23 57 96 3.3 -9 685.20 -53.9 -51.9 -52.8 84 -99 SPO 1997 10 10 23 58 100 3.3 -9 685.20 -54.0 -52.0 -52.9 -99 -99 SPO 1997 10 10 23 59 102 3.3 -9 685.20 -54.0 -52.0 -53.0 -99 -99 SPO 1997 10 11 00 00 98 3.5 -9 685.30 -54.0 -52.1 -53.0 -99 0 SPO 1997 10 11 00 01 95 3.5 -9 685.20 -53.9 -52.2 -52.9 -99 -99 SPO 1997 10 11 00 02 92 3.8 -9 685.20 -53.7 -52.0 -52.7 -99 -99 SPO 1997 10 11 00 03 88 4.2 -9 685.20 -53.7 -51.8 -52.7 84 -99 SPO 1997 10 11 00 04 85 4.3 -9 685.10 -53.7 -51.6 -52.7 84 -99 SPO 1997 10 11 00 05 80 4.5 -9 685.10 -53.7 -51.3 -52.7 84 -99 SPO 1997 10 11 00 06 76 4.5 -9 685.20 -53.7 -51.0 -52.8 84 -99 SPO 1997 10 11 00 07 75 4.4 -9 685.20 -53.9 -50.9 -53.1 84 -99 SPO 1997 10 11 00 08 75 4.5 -9 685.20 -54.0 -50.7 -53.4 84 -99 SPO 1997 10 11 00 09 79 4.5 -9 685.20 -54.2 -50.7 -53.4 86 -99 SPO 1997 10 11 00 10 83 4.2 -9 685.30 -54.4 -50.6 -53.5 87 -99 SPO 1997 10 11 00 11 88 3.7 -9 685.30 -54.5 -50.8 -53.4 86 -99 SPO 1997 10 11 00 12 94 3.5 -9 685.30 -54.7 -50.9 -53.5 87 -99 SPO 1997 10 11 00 13 101 3.4 -9 685.30 -54.7 -51.1 -53.6 86 -99 SPO 1997 10 11 00 14 106 3.2 -9 685.30 -54.7 -51.3 -53.7 85 -99 SPO 1997 10 11 00 15 107 3.1 -9 685.30 -54.7 -51.3 -53.7 84 -99 SPO 1997 10 11 00 16 97 3.4 -9 685.30 -54.9 -51.3 -53.8 86 -99 SPO 1997 10 11 00 17 88 3.8 -9 685.30 -55.0 -51.2 -53.8 86 -99 SPO 1997 10 11 00 18 82 4.5 -9 685.30 -54.9 -50.9 -53.6 84 -99 SPO 1997 10 11 00 19 78 5.0 -9 685.20 -54.9 -50.7 -53.6 84 -99 SPO 1997 10 11 00 20 74 5.3 -9 685.30 -54.7 -50.7 -53.5 82 -99 SPO 1997 10 11 00 21 71 5.5 -9 685.30 -54.5 -50.6 -53.4 80 -99 SPO 1997 10 11 00 22 69 5.7 -9 685.30 -54.2 -50.6 -53.4 77 -99 SPO 1997 10 11 00 23 70 5.6 -9 685.30 -54.2 -50.6 -53.3 79 -99 SPO 1997 10 11 00 24 73 5.3 -9 685.30 -54.2 -50.7 -53.3 80 -99 SPO 1997 10 11 00 25 78 4.7 -9 685.40 -54.2 -50.8 -53.2 80 -99 SPO 1997 10 11 00 26 87 3.8 -9 685.40 -54.4 -51.1 -53.3 82 -99 SPO 1997 10 11 00 27 103 2.9 -9 685.40 -54.5 -51.4 -53.6 82 -99 SPO 1997 10 11 00 28 127 2.4 -9 685.40 -54.5 -52.0 -53.6 81 -99 SPO 1997 10 11 00 29 142 2.1 -9 685.50 -54.9 -52.4 -53.9 85 -99 SPO 1997 10 11 00 30 144 2.5 -9 685.50 -55.2 -53.1 -54.2 87 -99 SPO 1997 10 11 00 31 132 2.8 -9 685.50 -55.0 -53.4 -54.0 83 -99 SPO 1997 10 11 00 32 106 3.1 -9 685.40 -54.5 -52.9 -53.6 77 -99 SPO 1997 10 11 00 33 89 3.6 -9 685.40 -54.2 -52.2 -53.4 74 -99 SPO 1997 10 11 00 34 78 3.9 -9 685.40 -54.2 -51.6 -53.3 75 -99 SPO 1997 10 11 00 35 73 4.2 -9 685.40 -54.4 -51.4 -53.4 79 -99 SPO 1997 10 11 00 36 73 4.3 -9 685.40 -54.4 -51.3 -53.6 80 -99 SPO 1997 10 11 00 37 77 4.7 -9 685.40 -54.4 -50.9 -53.9 81 -99 SPO 1997 10 11 00 38 75 4.4 -9 685.40 -54.5 -51.3 -54.1 83 -99 SPO 1997 10 11 00 39 76 4.7 -9 685.40 -54.7 -51.2 -54.3 84 -99 SPO 1997 10 11 00 40 76 4.6 -9 685.40 -55.0 -51.0 -54.5 87 -99 SPO 1997 10 11 00 41 76 4.6 -9 685.40 -55.2 -51.1 -54.6 87 -99 SPO 1997 10 11 00 42 77 4.5 -9 685.40 -55.0 -51.0 -54.5 83 -99 SPO 1997 10 11 00 43 78 4.6 -9 685.40 -54.7 -50.9 -54.2 79 -99 SPO 1997 10 11 00 44 77 4.7 -9 685.40 -54.5 -51.0 -54.0 77 -99 SPO 1997 10 11 00 45 76 4.8 -9 685.40 -54.4 -50.9 -53.8 76 -99 SPO 1997 10 11 00 46 74 4.8 -9 685.40 -54.5 -50.9 -53.8 78 -99 SPO 1997 10 11 00 47 75 4.8 -9 685.40 -54.4 -50.6 -53.7 77 -99 SPO 1997 10 11 00 48 70 5.0 -9 685.40 -54.4 -50.8 -53.7 78 -99 SPO 1997 10 11 00 49 69 5.1 -9 685.40 -54.2 -50.2 -53.6 77 -99 SPO 1997 10 11 00 50 69 5.2 -9 685.40 -54.0 -49.6 -53.5 75 -99 SPO 1997 10 11 00 51 66 4.9 -9 685.40 -54.0 -49.6 -53.4 76 -99 SPO 1997 10 11 00 52 64 4.8 -9 685.40 -54.0 -50.2 -53.5 76 -99 SPO 1997 10 11 00 53 64 4.8 -9 685.40 -54.0 -50.2 -53.5 77 -99 SPO 1997 10 11 00 54 69 4.8 -9 685.40 -54.2 -50.0 -53.5 79 -99 SPO 1997 10 11 00 55 70 4.6 -9 685.40 -54.2 -50.1 -53.4 80 -99 SPO 1997 10 11 00 56 69 4.5 -9 685.40 -54.2 -50.4 -53.6 80 -99 SPO 1997 10 11 00 57 69 4.8 -9 685.40 -54.4 -50.4 -53.7 81 -99 SPO 1997 10 11 00 58 67 5.0 -9 685.40 -54.5 -50.4 -53.8 81 -99 SPO 1997 10 11 00 59 64 5.4 -9 685.40 -54.5 -50.5 -53.9 80 -99 SPO 1997 10 11 01 00 63 5.7 -9 685.40 -54.7 -50.3 -54.0 81 0 SPO 1997 10 11 01 01 62 6.0 -9 685.30 -54.7 -50.0 -54.1 81 -99 SPO 1997 10 11 01 02 61 6.2 -9 685.30 -54.7 -49.8 -54.1 80 -99 SPO 1997 10 11 01 03 58 6.4 -9 685.20 -54.7 -49.8 -54.1 79 -99 SPO 1997 10 11 01 04 56 6.7 -9 685.20 -54.5 -49.6 -54.1 77 -99 SPO 1997 10 11 01 05 54 7.0 -9 685.20 -54.7 -49.6 -54.1 79 -99 SPO 1997 10 11 01 06 53 7.4 -9 685.20 -54.5 -49.5 -54.1 76 -99 SPO 1997 10 11 01 07 52 7.6 -9 685.20 -54.5 -49.4 -54.1 76 -99 SPO 1997 10 11 01 08 51 7.7 -9 685.10 -54.5 -49.3 -54.1 76 -99 SPO 1997 10 11 01 09 51 7.7 -9 685.10 -54.5 -49.3 -54.1 74 -99 SPO 1997 10 11 01 10 50 7.8 -9 685.10 -54.5 -49.3 -54.1 74 -99 SPO 1997 10 11 01 11 50 7.7 -9 685.10 -54.4 -49.2 -53.9 73 -99 SPO 1997 10 11 01 12 50 7.5 -9 685.10 -54.2 -49.1 -53.8 72 -99 SPO 1997 10 11 01 13 49 7.7 -9 685.10 -54.2 -49.1 -53.7 72 -99 SPO 1997 10 11 01 14 49 7.7 -9 685.10 -54.0 -49.1 -53.6 72 -99 SPO 1997 10 11 01 15 49 7.7 -9 685.10 -54.0 -49.1 -53.6 72 -99 SPO 1997 10 11 01 16 49 7.5 -9 685.10 -54.0 -49.2 -53.6 73 -99 SPO 1997 10 11 01 17 51 7.4 -9 685.10 -54.0 -49.2 -53.6 73 -99 SPO 1997 10 11 01 18 52 7.3 -9 685.10 -54.0 -49.2 -53.6 75 -99 SPO 1997 10 11 01 19 52 7.2 -9 685.10 -54.0 -49.2 -53.7 75 -99 SPO 1997 10 11 01 20 52 6.9 -9 685.20 -54.0 -49.3 -53.6 75 -99 SPO 1997 10 11 01 21 51 6.7 -9 685.20 -54.0 -49.3 -53.6 74 -99 SPO 1997 10 11 01 22 52 6.4 -9 685.20 -54.2 -49.3 -53.7 75 -99 SPO 1997 10 11 01 23 53 6.3 -9 685.20 -54.2 -49.3 -53.8 74 -99 SPO 1997 10 11 01 24 54 6.4 -9 685.20 -54.2 -49.3 -53.8 73 -99 SPO 1997 10 11 01 25 56 6.2 -9 685.20 -54.2 -49.1 -53.7 73 -99 SPO 1997 10 11 01 26 55 6.4 -9 685.20 -54.0 -49.2 -53.7 71 -99 SPO 1997 10 11 01 27 55 6.5 -9 685.20 -54.0 -49.4 -53.7 70 -99 SPO 1997 10 11 01 28 54 6.9 -9 685.20 -54.0 -49.2 -53.7 71 -99 SPO 1997 10 11 01 29 54 7.0 -9 685.10 -54.2 -49.2 -53.8 72 -99 SPO 1997 10 11 01 30 54 7.3 -9 685.10 -54.2 -49.2 -53.8 72 -99 SPO 1997 10 11 01 31 52 7.7 -9 685.10 -54.2 -49.2 -53.8 72 -99 SPO 1997 10 11 01 32 52 8.0 -9 685.10 -54.2 -49.1 -53.8 72 -99 SPO 1997 10 11 01 33 51 7.9 -9 685.00 -54.2 -49.1 -53.8 71 -99 SPO 1997 10 11 01 34 50 8.1 -9 685.00 -54.2 -49.0 -53.8 70 -99 SPO 1997 10 11 01 35 49 8.2 -9 685.00 -54.0 -49.1 -53.7 68 -99 SPO 1997 10 11 01 36 48 8.3 -9 685.00 -54.0 -49.0 -53.7 68 -99 SPO 1997 10 11 01 37 47 8.3 -9 685.00 -54.0 -48.8 -53.6 68 -99 SPO 1997 10 11 01 38 47 8.1 -9 685.00 -54.0 -48.8 -53.6 69 -99 SPO 1997 10 11 01 39 45 8.3 -9 685.00 -54.0 -48.7 -53.7 70 -99 SPO 1997 10 11 01 40 46 7.8 -9 685.10 -54.0 -48.8 -53.7 71 -99 SPO 1997 10 11 01 41 47 7.7 -9 685.10 -54.0 -48.8 -53.7 71 -99 SPO 1997 10 11 01 42 46 7.7 -9 685.10 -54.0 -48.8 -53.8 71 -99 SPO 1997 10 11 01 43 46 7.7 -9 685.10 -54.2 -48.9 -53.8 73 -99 SPO 1997 10 11 01 44 47 7.4 -9 685.10 -54.0 -49.0 -53.7 72 -99 SPO 1997 10 11 01 45 47 7.2 -9 685.20 -54.0 -49.1 -53.6 71 -99 SPO 1997 10 11 01 46 50 6.4 -9 685.20 -54.0 -49.4 -53.6 71 -99 SPO 1997 10 11 01 47 51 6.2 -9 685.20 -54.2 -49.7 -53.7 72 -99 SPO 1997 10 11 01 48 51 6.2 -9 685.20 -54.2 -49.8 -53.7 73 -99 SPO 1997 10 11 01 49 53 6.5 -9 685.10 -54.2 -49.8 -53.8 73 -99 SPO 1997 10 11 01 50 51 7.0 -9 685.00 -54.2 -49.6 -53.8 73 -99 SPO 1997 10 11 01 51 49 7.4 -9 685.00 -54.2 -49.4 -53.8 74 -99 SPO 1997 10 11 01 52 47 8.1 -9 685.00 -54.2 -49.1 -53.7 74 -99 SPO 1997 10 11 01 53 46 7.8 -9 685.00 -54.0 -48.9 -53.6 72 -99 SPO 1997 10 11 01 54 44 8.5 -9 685.00 -53.9 -48.4 -53.5 72 -99 SPO 1997 10 11 01 55 44 8.3 -9 685.00 -53.7 -48.4 -53.3 70 -99 SPO 1997 10 11 01 56 45 8.2 -9 685.00 -53.5 -48.7 -53.3 69 -99 SPO 1997 10 11 01 57 46 7.5 -9 685.00 -53.5 -48.9 -53.4 69 -99 SPO 1997 10 11 01 58 47 7.3 -9 685.10 -53.7 -49.2 -53.4 72 -99 SPO 1997 10 11 01 59 48 7.1 -9 685.10 -53.7 -49.3 -53.3 72 -99 SPO 1997 10 11 02 00 49 6.8 -9 685.10 -53.7 -49.4 -53.2 73 0 SPO 1997 10 11 02 01 49 6.9 -9 685.10 -53.7 -49.5 -53.2 73 -99 SPO 1997 10 11 02 02 47 6.8 -9 685.10 -53.7 -49.4 -53.2 74 -99 SPO 1997 10 11 02 03 47 6.6 -9 685.10 -53.7 -49.4 -53.2 75 -99 SPO 1997 10 11 02 04 46 6.7 -9 685.10 -53.5 -49.3 -53.2 73 -99 SPO 1997 10 11 02 05 45 6.3 -9 685.10 -53.5 -49.4 -53.1 74 -99 SPO 1997 10 11 02 06 46 6.3 -9 685.10 -53.5 -49.6 -53.0 74 -99 SPO 1997 10 11 02 07 46 6.1 -9 685.10 -53.5 -49.7 -53.0 75 -99 SPO 1997 10 11 02 08 47 6.0 -9 685.20 -53.5 -49.8 -53.0 75 -99 SPO 1997 10 11 02 09 50 5.9 -9 685.20 -53.7 -49.7 -53.1 77 -99 SPO 1997 10 11 02 10 51 5.9 -9 685.20 -53.7 -49.8 -53.2 77 -99 SPO 1997 10 11 02 11 49 4.9 -9 685.20 -53.7 -50.1 -53.1 77 -99 SPO 1997 10 11 02 12 51 5.0 -9 685.20 -53.7 -50.6 -53.1 77 -99 SPO 1997 10 11 02 13 55 5.4 -9 685.30 -53.7 -50.3 -53.2 78 -99 SPO 1997 10 11 02 14 54 5.0 -9 685.40 -53.7 -50.1 -53.2 79 -99 SPO 1997 10 11 02 15 53 4.3 -9 685.40 -54.0 -50.4 -53.2 82 -99 SPO 1997 10 11 02 16 52 4.6 -9 685.40 -54.0 -50.4 -53.2 82 -99 SPO 1997 10 11 02 17 52 4.3 -9 685.40 -54.0 -50.2 -53.1 82 -99 SPO 1997 10 11 02 18 55 4.1 -9 685.40 -54.0 -50.4 -53.1 82 -99 SPO 1997 10 11 02 19 57 4.2 -9 685.40 -54.0 -50.4 -53.1 82 -99 SPO 1997 10 11 02 20 58 4.3 -9 685.40 -54.0 -50.4 -53.1 82 -99 SPO 1997 10 11 02 21 60 4.5 -9 685.40 -54.0 -50.3 -53.2 81 -99 SPO 1997 10 11 02 22 61 4.7 -9 685.40 -53.9 -50.2 -53.2 80 -99 SPO 1997 10 11 02 23 62 4.8 -9 685.40 -54.0 -50.4 -53.2 81 -99 SPO 1997 10 11 02 24 61 5.1 -9 685.40 -54.0 -50.6 -53.3 81 -99 SPO 1997 10 11 02 25 60 5.5 -9 685.40 -54.2 -50.4 -53.4 82 -99 SPO 1997 10 11 02 26 59 5.7 -9 685.40 -54.2 -50.0 -53.4 82 -99 SPO 1997 10 11 02 27 58 5.8 -9 685.40 -54.0 -49.9 -53.4 79 -99 SPO 1997 10 11 02 28 56 5.6 -9 685.40 -54.2 -50.0 -53.4 81 -99 SPO 1997 10 11 02 29 56 5.9 -9 685.40 -54.2 -49.9 -53.4 81 -99 SPO 1997 10 11 02 30 56 5.5 -9 685.40 -54.2 -50.0 -53.5 81 -99 SPO 1997 10 11 02 31 55 5.1 -9 685.40 -54.2 -50.4 -53.5 80 -99 SPO 1997 10 11 02 32 56 5.2 -9 685.40 -54.2 -50.5 -53.5 80 -99 SPO 1997 10 11 02 33 57 5.5 -9 685.40 -54.2 -50.2 -53.5 79 -99 SPO 1997 10 11 02 34 57 5.1 -9 685.40 -54.2 -50.3 -53.5 78 -99 SPO 1997 10 11 02 35 59 4.9 -9 685.40 -54.2 -50.4 -53.5 78 -99 SPO 1997 10 11 02 36 64 4.8 -9 685.40 -54.2 -50.2 -53.4 78 -99 SPO 1997 10 11 02 37 67 4.5 -9 685.50 -54.2 -50.2 -53.4 78 -99 SPO 1997 10 11 02 38 70 4.5 -9 685.50 -54.4 -50.1 -53.3 80 -99 SPO 1997 10 11 02 39 75 3.8 -9 685.50 -54.4 -50.7 -53.2 80 -99 SPO 1997 10 11 02 40 76 4.0 -9 685.50 -54.5 -50.9 -53.1 81 -99 SPO 1997 10 11 02 41 81 3.8 -9 685.50 -54.5 -51.0 -53.0 81 -99 SPO 1997 10 11 02 42 78 3.9 -9 685.50 -54.5 -50.8 -53.1 81 -99 SPO 1997 10 11 02 43 77 3.5 -9 685.50 -54.5 -51.0 -53.0 80 -99 SPO 1997 10 11 02 44 72 4.1 -9 685.60 -54.5 -50.8 -53.1 79 -99 SPO 1997 10 11 02 45 72 4.0 -9 685.50 -54.5 -50.8 -53.0 80 -99 SPO 1997 10 11 02 46 69 4.1 -9 685.50 -54.5 -51.0 -53.2 80 -99 SPO 1997 10 11 02 47 71 4.3 -9 685.50 -54.5 -50.8 -53.4 80 -99 SPO 1997 10 11 02 48 70 4.5 -9 685.50 -54.7 -51.0 -53.5 83 -99 SPO 1997 10 11 02 49 69 4.6 -9 685.50 -54.9 -50.9 -53.6 85 -99 SPO 1997 10 11 02 50 67 4.8 -9 685.50 -55.0 -50.9 -53.7 85 -99 SPO 1997 10 11 02 51 68 4.5 -9 685.50 -55.0 -50.5 -53.7 84 -99 SPO 1997 10 11 02 52 69 4.2 -9 685.50 -55.0 -50.8 -53.7 83 -99 SPO 1997 10 11 02 53 74 3.7 -9 685.60 -55.0 -51.1 -53.5 82 -99 SPO 1997 10 11 02 54 83 3.0 -9 685.60 -55.2 -51.2 -53.3 84 -99 SPO 1997 10 11 02 55 101 2.4 -9 685.70 -55.2 -51.6 -53.6 83 -99 SPO 1997 10 11 02 56 123 2.1 -9 685.70 -55.2 -52.3 -53.8 83 -99 SPO 1997 10 11 02 57 125 2.5 -9 685.70 -55.2 -53.0 -53.8 83 -99 SPO 1997 10 11 02 58 112 3.0 -9 685.60 -55.2 -52.8 -53.9 82 -99 SPO 1997 10 11 02 59 98 3.5 -9 685.60 -55.2 -52.4 -54.0 81 -99 SPO 1997 10 11 03 00 86 3.8 -9 685.50 -55.2 -52.1 -53.9 81 0 SPO 1997 10 11 03 01 78 4.1 -9 685.50 -55.0 -51.6 -53.7 80 -99 SPO 1997 10 11 03 02 73 4.2 -9 685.50 -55.0 -51.4 -53.6 81 -99 SPO 1997 10 11 03 03 71 4.1 -9 685.50 -54.9 -51.5 -53.7 81 -99 SPO 1997 10 11 03 04 71 4.0 -9 685.50 -55.0 -51.4 -53.8 82 -99 SPO 1997 10 11 03 05 76 3.7 -9 685.50 -55.0 -51.5 -53.7 82 -99 SPO 1997 10 11 03 06 83 3.4 -9 685.60 -55.0 -51.8 -53.5 82 -99 SPO 1997 10 11 03 07 95 2.8 -9 685.60 -55.2 -52.2 -53.6 84 -99 SPO 1997 10 11 03 08 112 2.6 -9 685.70 -55.2 -52.7 -53.8 83 -99 SPO 1997 10 11 03 09 119 2.6 -9 685.70 -54.9 -52.9 -53.7 80 -99 SPO 1997 10 11 03 10 111 2.7 -9 685.70 -54.7 -52.8 -53.6 79 -99 SPO 1997 10 11 03 11 95 3.0 -9 685.60 -54.7 -52.6 -53.6 79 -99 SPO 1997 10 11 03 12 84 3.5 -9 685.60 -54.7 -52.2 -53.4 80 -99 SPO 1997 10 11 03 13 78 3.8 -9 685.50 -54.7 -51.8 -53.2 81 -99 SPO 1997 10 11 03 14 73 3.9 -9 685.50 -54.5 -51.5 -53.2 81 -99 SPO 1997 10 11 03 15 68 4.0 -9 685.50 -54.5 -51.3 -53.4 82 -99 SPO 1997 10 11 03 16 68 4.0 -9 685.50 -54.5 -51.3 -53.5 82 -99 SPO 1997 10 11 03 17 70 4.0 -9 685.50 -54.5 -51.3 -53.5 82 -99 SPO 1997 10 11 03 18 72 4.2 -9 685.50 -54.5 -51.3 -53.4 82 -99 SPO 1997 10 11 03 19 74 4.3 -9 685.50 -54.7 -51.3 -53.4 84 -99 SPO 1997 10 11 03 20 71 4.5 -9 685.50 -54.7 -51.4 -53.4 84 -99 SPO 1997 10 11 03 21 69 4.8 -9 685.50 -54.9 -51.3 -53.7 84 -99 SPO 1997 10 11 03 22 70 5.1 -9 685.50 -55.0 -51.3 -53.8 85 -99 SPO 1997 10 11 03 23 69 5.3 -9 685.40 -55.0 -51.2 -53.9 84 -99 SPO 1997 10 11 03 24 66 5.4 -9 685.40 -55.0 -51.2 -54.0 83 -99 SPO 1997 10 11 03 25 65 5.1 -9 685.40 -55.2 -51.2 -54.2 85 -99 SPO 1997 10 11 03 26 65 4.8 -9 685.40 -55.2 -51.2 -54.3 83 -99 SPO 1997 10 11 03 27 68 4.5 -9 685.50 -55.4 -51.4 -54.2 85 -99 SPO 1997 10 11 03 28 72 4.0 -9 685.50 -55.4 -51.5 -54.0 84 -99 SPO 1997 10 11 03 29 80 3.5 -9 685.60 -55.5 -51.7 -53.8 84 -99 SPO 1997 10 11 03 30 85 2.9 -9 685.60 -55.5 -52.0 -54.0 83 -99 SPO 1997 10 11 03 31 89 2.9 -9 685.70 -55.5 -52.2 -54.1 83 -99 SPO 1997 10 11 03 32 89 3.5 -9 685.60 -55.5 -52.0 -54.2 84 -99 SPO 1997 10 11 03 33 83 4.2 -9 685.60 -55.4 -51.7 -54.1 83 -99 SPO 1997 10 11 03 34 77 4.5 -9 685.60 -55.2 -51.4 -53.8 81 -99 SPO 1997 10 11 03 35 74 4.7 -9 685.60 -55.2 -51.3 -53.8 82 -99 SPO 1997 10 11 03 36 67 4.7 -9 685.50 -55.2 -51.2 -53.9 82 -99 SPO 1997 10 11 03 37 63 4.8 -9 685.50 -55.2 -51.1 -54.2 82 -99 SPO 1997 10 11 03 38 65 4.9 -9 685.50 -55.2 -51.0 -54.1 82 -99 SPO 1997 10 11 03 39 68 4.7 -9 685.50 -55.0 -51.4 -54.0 81 -99 SPO 1997 10 11 03 40 71 4.6 -9 685.50 -55.0 -51.5 -54.0 81 -99 SPO 1997 10 11 03 41 72 4.4 -9 685.50 -55.0 -51.6 -53.9 82 -99 SPO 1997 10 11 03 42 74 4.3 -9 685.50 -55.0 -51.6 -53.8 82 -99 SPO 1997 10 11 03 43 75 4.3 -9 685.50 -55.2 -51.6 -53.7 84 -99 SPO 1997 10 11 03 44 71 3.5 -9 685.60 -55.2 -51.8 -53.7 84 -99 SPO 1997 10 11 03 45 75 3.8 -9 685.60 -55.2 -51.5 -53.6 84 -99 SPO 1997 10 11 03 46 75 4.0 -9 685.60 -55.0 -51.5 -53.5 82 -99 SPO 1997 10 11 03 47 73 4.5 -9 685.60 -55.0 -51.2 -53.6 82 -99 SPO 1997 10 11 03 48 74 4.9 -9 685.60 -55.0 -50.9 -53.6 81 -99 SPO 1997 10 11 03 49 72 4.5 -9 685.60 -55.0 -51.0 -53.7 81 -99 SPO 1997 10 11 03 50 72 4.7 -9 685.60 -55.0 -50.6 -53.8 81 -99 SPO 1997 10 11 03 51 69 3.8 -9 685.60 -55.2 -51.0 -53.9 83 -99 SPO 1997 10 11 03 52 69 3.8 -9 685.60 -55.4 -51.6 -54.0 85 -99 SPO 1997 10 11 03 53 74 4.4 -9 685.60 -55.4 -50.7 -53.8 86 -99 SPO 1997 10 11 03 54 77 3.5 -9 685.60 -55.4 -51.0 -53.6 86 -99 SPO 1997 10 11 03 55 84 2.6 -9 685.60 -55.4 -52.0 -53.5 86 -99 SPO 1997 10 11 03 56 87 2.4 -9 685.70 -55.5 -52.4 -53.6 87 -99 SPO 1997 10 11 03 57 91 3.1 -9 685.70 -55.7 -52.3 -54.3 89 -99 SPO 1997 10 11 03 58 85 3.5 -9 685.70 -55.9 -52.2 -54.6 90 -99 SPO 1997 10 11 03 59 82 3.8 -9 685.70 -55.9 -51.8 -54.6 90 -99 SPO 1997 10 11 04 00 73 3.7 -9 685.60 -55.9 -52.2 -54.3 89 0 SPO 1997 10 11 04 01 71 4.0 -9 685.60 -55.9 -52.1 -54.3 88 -99 SPO 1997 10 11 04 02 72 4.8 -9 685.60 -55.9 -51.4 -54.4 86 -99 SPO 1997 10 11 04 03 71 4.3 -9 685.60 -56.0 -51.7 -54.5 87 -99 SPO 1997 10 11 04 04 73 4.3 -9 685.60 -56.0 -51.8 -54.5 86 -99 SPO 1997 10 11 04 05 77 4.2 -9 685.70 -56.0 -51.9 -54.4 84 -99 SPO 1997 10 11 04 06 81 4.0 -9 685.60 -56.2 -52.2 -54.5 85 -99 SPO 1997 10 11 04 07 84 3.9 -9 685.70 -56.2 -52.4 -54.7 85 -99 SPO 1997 10 11 04 08 86 3.9 -9 685.70 -56.4 -52.4 -55.0 86 -99 SPO 1997 10 11 04 09 87 4.1 -9 685.70 -56.4 -52.5 -55.2 85 -99 SPO 1997 10 11 04 10 84 4.4 -9 685.70 -56.5 -52.3 -55.2 85 -99 SPO 1997 10 11 04 11 78 4.4 -9 685.70 -56.5 -52.2 -55.1 85 -99 SPO 1997 10 11 04 12 72 4.6 -9 685.70 -56.4 -52.1 -55.0 83 -99 SPO 1997 10 11 04 13 67 4.8 -9 685.70 -56.4 -51.9 -55.2 81 -99 SPO 1997 10 11 04 14 67 4.8 -9 685.70 -56.4 -51.8 -55.3 81 -99 SPO 1997 10 11 04 15 67 4.7 -9 685.70 -56.4 -51.8 -55.2 80 -99 SPO 1997 10 11 04 16 69 4.4 -9 685.80 -56.2 -51.8 -55.1 78 -99 SPO 1997 10 11 04 17 77 3.8 -9 685.80 -56.2 -51.9 -54.9 78 -99 SPO 1997 10 11 04 18 98 2.9 -9 685.80 -56.2 -52.1 -54.9 79 -99 SPO 1997 10 11 04 19 114 2.7 -9 685.80 -56.2 -52.3 -55.1 79 -99 SPO 1997 10 11 04 20 124 2.7 -9 685.80 -56.0 -52.4 -55.0 79 -99 SPO 1997 10 11 04 21 115 2.5 -9 685.80 -55.7 -52.5 -54.8 77 -99 SPO 1997 10 11 04 22 94 3.0 -9 685.80 -55.5 -52.4 -54.7 76 -99 SPO 1997 10 11 04 23 86 3.5 -9 685.80 -55.4 -52.2 -54.4 78 -99 SPO 1997 10 11 04 24 80 3.5 -9 685.80 -55.2 -52.0 -54.2 78 -99 SPO 1997 10 11 04 25 79 3.9 -9 685.80 -55.0 -51.8 -54.0 78 -99 SPO 1997 10 11 04 26 80 3.9 -9 685.80 -54.7 -51.8 -53.9 76 -99 SPO 1997 10 11 04 27 83 3.8 -9 685.80 -54.9 -51.9 -53.9 79 -99 SPO 1997 10 11 04 28 83 3.8 -9 685.90 -54.7 -52.0 -53.8 78 -99 SPO 1997 10 11 04 29 85 3.6 -9 685.90 -54.7 -52.2 -53.8 78 -99 SPO 1997 10 11 04 30 88 3.4 -9 685.90 -54.9 -52.0 -53.8 81 -99 SPO 1997 10 11 04 31 87 3.4 -9 685.90 -55.2 -52.0 -54.0 85 -99 SPO 1997 10 11 04 32 80 3.5 -9 685.90 -55.4 -51.9 -54.1 87 -99 SPO 1997 10 11 04 33 74 3.7 -9 685.90 -55.4 -51.8 -54.0 87 -99 SPO 1997 10 11 04 34 71 4.5 -9 685.80 -55.4 -51.6 -54.2 87 -99 SPO 1997 10 11 04 35 68 5.2 -9 685.80 -55.2 -51.5 -54.4 84 -99 SPO 1997 10 11 04 36 64 5.5 -9 685.80 -55.2 -51.3 -54.4 84 -99 SPO 1997 10 11 04 37 63 5.4 -9 685.80 -55.0 -51.2 -54.4 82 -99 SPO 1997 10 11 04 38 65 5.4 -9 685.90 -55.0 -51.1 -54.3 81 -99 SPO 1997 10 11 04 39 64 5.2 -9 685.90 -55.0 -51.4 -54.4 81 -99 SPO 1997 10 11 04 40 64 5.4 -9 685.90 -55.0 -51.1 -54.4 81 -99 SPO 1997 10 11 04 41 62 5.5 -9 685.90 -55.0 -51.2 -54.4 80 -99 SPO 1997 10 11 04 42 60 5.6 -9 685.90 -55.0 -51.4 -54.4 79 -99 SPO 1997 10 11 04 43 58 5.7 -9 685.90 -55.0 -51.3 -54.5 79 -99 SPO 1997 10 11 04 44 58 6.0 -9 685.80 -54.9 -51.0 -54.5 78 -99 SPO 1997 10 11 04 45 57 6.0 -9 685.80 -54.9 -51.0 -54.4 78 -99 SPO 1997 10 11 04 46 54 6.1 -9 685.80 -54.7 -51.0 -54.2 77 -99 SPO 1997 10 11 04 47 54 6.1 -9 685.90 -54.5 -50.7 -54.0 75 -99 SPO 1997 10 11 04 48 55 5.8 -9 685.90 -54.4 -50.9 -54.0 75 -99 SPO 1997 10 11 04 49 54 5.8 -9 685.90 -54.4 -51.1 -54.0 75 -99 SPO 1997 10 11 04 50 53 6.3 -9 685.80 -54.4 -50.8 -54.0 76 -99 SPO 1997 10 11 04 51 55 6.5 -9 685.80 -54.2 -50.7 -54.0 74 -99 SPO 1997 10 11 04 52 54 6.2 -9 685.80 -54.2 -51.0 -54.0 74 -99 SPO 1997 10 11 04 53 54 6.2 -9 685.90 -54.4 -51.0 -54.0 76 -99 SPO 1997 10 11 04 54 53 6.0 -9 685.90 -54.2 -50.8 -54.0 74 -99 SPO 1997 10 11 04 55 51 5.6 -9 686.00 -54.2 -50.6 -54.0 73 -99 SPO 1997 10 11 04 56 52 5.2 -9 686.00 -54.2 -50.8 -53.9 75 -99 SPO 1997 10 11 04 57 54 5.0 -9 686.00 -54.2 -50.9 -53.9 76 -99 SPO 1997 10 11 04 58 53 4.4 -9 686.00 -54.2 -51.3 -53.8 77 -99 SPO 1997 10 11 04 59 54 4.2 -9 686.10 -54.2 -51.4 -53.8 78 -99 SPO 1997 10 11 05 00 58 4.0 -9 686.10 -54.2 -51.5 -54.0 79 0 SPO 1997 10 11 05 01 60 3.6 -9 686.10 -54.4 -51.6 -54.0 81 -99 SPO 1997 10 11 05 02 76 3.3 -9 686.10 -54.4 -51.6 -53.8 82 -99 SPO 1997 10 11 05 03 81 2.6 -9 686.10 -54.5 -51.9 -53.8 83 -99 SPO 1997 10 11 05 04 87 2.7 -9 686.20 -54.5 -52.0 -53.8 83 -99 SPO 1997 10 11 05 05 83 2.9 -9 686.10 -54.5 -52.1 -53.9 83 -99 SPO 1997 10 11 05 06 73 3.6 -9 686.10 -54.5 -52.0 -53.8 83 -99 SPO 1997 10 11 05 07 67 4.2 -9 686.10 -54.5 -51.5 -53.8 84 -99 SPO 1997 10 11 05 08 63 4.5 -9 686.10 -54.5 -51.4 -53.9 84 -99 SPO 1997 10 11 05 09 64 4.7 -9 686.10 -54.5 -51.2 -54.0 85 -99 SPO 1997 10 11 05 10 67 4.2 -9 686.10 -54.5 -51.1 -54.0 85 -99 SPO 1997 10 11 05 11 71 3.7 -9 686.10 -54.5 -51.4 -54.0 84 -99 SPO 1997 10 11 05 12 79 3.5 -9 686.10 -54.5 -51.8 -53.9 83 -99 SPO 1997 10 11 05 13 87 3.5 -9 686.10 -54.7 -51.8 -53.9 83 -99 SPO 1997 10 11 05 14 85 3.5 -9 686.10 -55.0 -52.0 -54.1 85 -99 SPO 1997 10 11 05 15 79 3.7 -9 686.10 -55.0 -51.9 -54.2 84 -99 SPO 1997 10 11 05 16 70 4.2 -9 686.10 -55.2 -51.8 -54.2 86 -99 SPO 1997 10 11 05 17 65 5.1 -9 686.10 -55.0 -51.2 -54.4 83 -99 SPO 1997 10 11 05 18 62 5.6 -9 686.10 -54.9 -51.0 -54.4 81 -99 SPO 1997 10 11 05 19 57 5.5 -9 686.10 -54.9 -51.1 -54.5 80 -99 SPO 1997 10 11 05 20 56 5.8 -9 686.10 -55.0 -50.8 -54.6 80 -99 SPO 1997 10 11 05 21 60 5.9 -9 686.10 -55.0 -50.2 -54.7 79 -99 SPO 1997 10 11 05 22 61 5.5 -9 686.10 -55.2 -50.4 -54.8 80 -99 SPO 1997 10 11 05 23 63 5.5 -9 686.10 -55.2 -50.7 -54.8 79 -99 SPO 1997 10 11 05 24 62 5.1 -9 686.10 -55.2 -50.8 -54.9 77 -99 SPO 1997 10 11 05 25 62 5.6 -9 686.10 -55.4 -50.8 -55.0 78 -99 SPO 1997 10 11 05 26 61 5.7 -9 686.10 -55.4 -50.8 -55.0 78 -99 SPO 1997 10 11 05 27 60 5.8 -9 686.10 -55.4 -50.7 -55.0 77 -99 SPO 1997 10 11 05 28 57 5.9 -9 686.10 -55.4 -50.8 -55.0 76 -99 SPO 1997 10 11 05 29 55 6.1 -9 686.00 -55.2 -50.8 -55.0 73 -99 SPO 1997 10 11 05 30 52 6.5 -9 686.00 -55.2 -50.7 -54.9 72 -99 SPO 1997 10 11 05 31 50 6.8 -9 686.00 -55.2 -50.6 -54.9 72 -99 SPO 1997 10 11 05 32 50 6.8 -9 686.10 -55.0 -50.5 -54.7 71 -99 SPO 1997 10 11 05 33 51 6.8 -9 686.00 -54.7 -50.6 -54.6 68 -99 SPO 1997 10 11 05 34 54 6.8 -9 686.10 -54.9 -50.6 -54.8 71 -99 SPO 1997 10 11 05 35 54 6.7 -9 686.00 -55.0 -50.8 -54.9 72 -99 SPO 1997 10 11 05 36 56 6.4 -9 686.00 -55.0 -50.8 -55.0 72 -99 SPO 1997 10 11 05 37 55 6.2 -9 686.00 -55.2 -50.8 -55.0 74 -99 SPO 1997 10 11 05 38 53 6.0 -9 686.10 -55.2 -50.9 -55.0 74 -99 SPO 1997 10 11 05 39 56 5.8 -9 686.10 -55.2 -50.9 -55.0 74 -99 SPO 1997 10 11 05 40 55 5.8 -9 686.00 -55.2 -50.9 -55.0 75 -99 SPO 1997 10 11 05 41 55 6.0 -9 686.00 -55.2 -51.0 -55.0 74 -99 SPO 1997 10 11 05 42 55 5.9 -9 686.10 -55.2 -50.9 -55.1 74 -99 SPO 1997 10 11 05 43 57 5.9 -9 686.00 -55.2 -50.6 -55.1 73 -99 SPO 1997 10 11 05 44 55 5.7 -9 686.00 -55.2 -51.0 -55.1 72 -99 SPO 1997 10 11 05 45 56 5.7 -9 686.00 -55.2 -51.1 -55.1 71 -99 SPO 1997 10 11 05 46 56 5.5 -9 686.00 -55.2 -51.0 -55.1 71 -99 SPO 1997 10 11 05 47 54 5.5 -9 686.00 -55.2 -51.0 -55.1 71 -99 SPO 1997 10 11 05 48 53 5.3 -9 686.00 -55.2 -51.0 -55.0 71 -99 SPO 1997 10 11 05 49 55 5.3 -9 686.00 -55.2 -51.0 -55.0 72 -99 SPO 1997 10 11 05 50 54 5.2 -9 686.00 -55.2 -51.0 -55.0 72 -99 SPO 1997 10 11 05 51 56 5.1 -9 686.10 -55.2 -51.1 -55.0 73 -99 SPO 1997 10 11 05 52 58 4.8 -9 686.10 -55.2 -51.1 -55.0 73 -99 SPO 1997 10 11 05 53 59 4.6 -9 686.10 -55.2 -51.3 -55.0 72 -99 SPO 1997 10 11 05 54 62 4.5 -9 686.10 -55.2 -51.4 -55.0 72 -99 SPO 1997 10 11 05 55 63 4.4 -9 686.10 -55.2 -51.4 -55.0 72 -99 SPO 1997 10 11 05 56 62 4.5 -9 686.10 -55.2 -51.2 -54.9 72 -99 SPO 1997 10 11 05 57 61 4.7 -9 686.10 -55.0 -50.9 -54.9 71 -99 SPO 1997 10 11 05 58 56 5.1 -9 686.10 -55.0 -50.8 -54.9 71 -99 SPO 1997 10 11 05 59 53 5.6 -9 686.10 -55.0 -50.6 -54.9 71 -99 SPO 1997 10 11 06 00 50 5.8 -9 686.00 -55.0 -50.4 -54.8 71 0 SPO 1997 10 11 06 01 49 6.1 -9 686.00 -54.9 -50.3 -54.8 71 -99 SPO 1997 10 11 06 02 49 6.0 -9 686.00 -54.7 -50.1 -54.7 70 -99 SPO 1997 10 11 06 03 49 6.0 -9 686.00 -54.7 -50.1 -54.6 71 -99 SPO 1997 10 11 06 04 50 6.2 -9 686.00 -54.7 -50.1 -54.6 71 -99 SPO 1997 10 11 06 05 50 6.1 -9 686.00 -54.7 -50.0 -54.6 71 -99 SPO 1997 10 11 06 06 51 6.0 -9 686.10 -54.5 -50.0 -54.5 69 -99 SPO 1997 10 11 06 07 51 5.5 -9 686.10 -54.5 -50.2 -54.5 70 -99 SPO 1997 10 11 06 08 53 5.2 -9 686.10 -54.5 -50.4 -54.4 70 -99 SPO 1997 10 11 06 09 55 5.2 -9 686.10 -54.4 -50.6 -54.4 70 -99 SPO 1997 10 11 06 10 58 4.9 -9 686.10 -54.4 -50.8 -54.4 71 -99 SPO 1997 10 11 06 11 59 4.7 -9 686.10 -54.4 -51.0 -54.3 72 -99 SPO 1997 10 11 06 12 57 4.5 -9 686.20 -54.4 -51.1 -54.4 72 -99 SPO 1997 10 11 06 13 56 4.4 -9 686.20 -54.4 -51.4 -54.3 72 -99 SPO 1997 10 11 06 14 55 4.5 -9 686.20 -54.4 -51.3 -54.4 72 -99 SPO 1997 10 11 06 15 55 4.7 -9 686.20 -54.4 -51.4 -54.3 72 -99 SPO 1997 10 11 06 16 56 4.9 -9 686.20 -54.2 -51.2 -54.3 71 -99 SPO 1997 10 11 06 17 57 5.1 -9 686.20 -54.2 -50.9 -54.2 71 -99 SPO 1997 10 11 06 18 55 5.3 -9 686.20 -54.2 -50.8 -54.2 71 -99 SPO 1997 10 11 06 19 53 5.3 -9 686.20 -54.2 -50.9 -54.2 71 -99 SPO 1997 10 11 06 20 51 5.2 -9 686.20 -54.0 -51.1 -54.0 69 -99 SPO 1997 10 11 06 21 51 5.2 -9 686.20 -54.0 -51.0 -54.0 70 -99 SPO 1997 10 11 06 22 53 5.1 -9 686.20 -53.9 -51.0 -53.9 71 -99 SPO 1997 10 11 06 23 53 5.1 -9 686.20 -53.9 -51.0 -53.8 71 -99 SPO 1997 10 11 06 24 51 4.9 -9 686.20 -53.7 -51.2 -53.8 71 -99 SPO 1997 10 11 06 25 52 5.0 -9 686.20 -53.7 -51.2 -53.7 71 -99 SPO 1997 10 11 06 26 52 5.0 -9 686.30 -53.5 -51.2 -53.7 70 -99 SPO 1997 10 11 06 27 51 5.0 -9 686.30 -53.5 -51.2 -53.6 71 -99 SPO 1997 10 11 06 28 50 5.0 -9 686.30 -53.5 -51.4 -53.5 71 -99 SPO 1997 10 11 06 29 51 4.9 -9 686.30 -53.4 -51.4 -53.5 71 -99 SPO 1997 10 11 06 30 51 5.0 -9 686.30 -53.4 -51.4 -53.4 71 -99 SPO 1997 10 11 06 31 52 5.1 -9 686.20 -53.4 -51.2 -53.3 72 -99 SPO 1997 10 11 06 32 50 5.3 -9 686.20 -53.2 -51.2 -53.3 70 -99 SPO 1997 10 11 06 33 50 5.5 -9 686.20 -53.2 -51.1 -53.2 71 -99 SPO 1997 10 11 06 34 49 5.7 -9 686.20 -53.0 -51.1 -53.2 70 -99 SPO 1997 10 11 06 35 46 6.0 -9 686.20 -53.0 -51.1 -53.0 71 -99 SPO 1997 10 11 06 36 45 6.3 -9 686.20 -52.9 -51.0 -52.9 71 -99 SPO 1997 10 11 06 37 45 6.2 -9 686.20 -52.9 -51.0 -52.9 72 -99 SPO 1997 10 11 06 38 44 6.2 -9 686.20 -52.7 -51.0 -52.9 71 -99 SPO 1997 10 11 06 39 43 6.2 -9 686.20 -52.7 -50.9 -52.8 71 -99 SPO 1997 10 11 06 40 43 6.2 -9 686.10 -52.7 -50.9 -52.7 71 -99 SPO 1997 10 11 06 41 42 6.2 -9 686.20 -52.5 -50.9 -52.7 69 -99 SPO 1997 10 11 06 42 40 6.3 -9 686.20 -52.5 -50.9 -52.6 69 -99 SPO 1997 10 11 06 43 41 6.2 -9 686.20 -52.4 -50.8 -52.5 69 -99 SPO 1997 10 11 06 44 43 6.0 -9 686.20 -52.2 -50.9 -52.4 69 -99 SPO 1997 10 11 06 45 42 6.1 -9 686.20 -52.2 -50.9 -52.4 69 -99 SPO 1997 10 11 06 46 43 6.0 -9 686.20 -52.2 -50.9 -52.3 70 -99 SPO 1997 10 11 06 47 43 6.0 -9 686.20 -52.2 -50.8 -52.3 71 -99 SPO 1997 10 11 06 48 42 6.0 -9 686.20 -52.2 -50.8 -52.3 73 -99 SPO 1997 10 11 06 49 45 6.0 -9 686.20 -52.2 -50.8 -52.2 73 -99 SPO 1997 10 11 06 50 44 6.2 -9 686.20 -52.2 -50.8 -52.2 74 -99 SPO 1997 10 11 06 51 45 6.4 -9 686.20 -52.0 -50.8 -52.2 72 -99 SPO 1997 10 11 06 52 43 6.3 -9 686.20 -52.0 -50.8 -52.1 72 -99 SPO 1997 10 11 06 53 43 6.3 -9 686.20 -52.0 -50.7 -52.1 72 -99 SPO 1997 10 11 06 54 42 6.2 -9 686.20 -52.0 -50.8 -52.1 73 -99 SPO 1997 10 11 06 55 41 6.4 -9 686.20 -52.0 -50.7 -52.0 73 -99 SPO 1997 10 11 06 56 42 6.4 -9 686.20 -52.0 -50.7 -52.0 73 -99 SPO 1997 10 11 06 57 42 6.5 -9 686.20 -52.0 -50.6 -52.0 73 -99 SPO 1997 10 11 06 58 43 6.6 -9 686.20 -52.0 -50.5 -52.0 74 -99 SPO 1997 10 11 06 59 41 6.6 -9 686.20 -51.9 -50.6 -52.0 74 -99 SPO 1997 10 11 07 00 41 6.8 -9 686.20 -51.7 -50.7 -51.8 72 0 SPO 1997 10 11 07 01 42 6.8 -9 686.20 -51.7 -50.6 -51.8 72 -99 SPO 1997 10 11 07 02 42 6.9 -9 686.20 -51.7 -50.6 -51.8 72 -99 SPO 1997 10 11 07 03 42 6.8 -9 686.20 -51.9 -50.6 -51.9 74 -99 SPO 1997 10 11 07 04 42 6.9 -9 686.20 -51.7 -50.6 -51.9 71 -99 SPO 1997 10 11 07 05 41 6.7 -9 686.20 -51.9 -50.6 -51.9 73 -99 SPO 1997 10 11 07 06 42 6.7 -9 686.20 -51.9 -50.7 -51.9 72 -99 SPO 1997 10 11 07 07 42 6.6 -9 686.20 -51.9 -50.8 -51.9 72 -99 SPO 1997 10 11 07 08 43 6.3 -9 686.30 -51.9 -50.8 -51.9 73 -99 SPO 1997 10 11 07 09 45 6.0 -9 686.30 -51.9 -50.8 -51.9 73 -99 SPO 1997 10 11 07 10 44 5.9 -9 686.30 -52.0 -50.9 -51.9 74 -99 SPO 1997 10 11 07 11 42 6.0 -9 686.30 -52.0 -50.9 -51.9 74 -99 SPO 1997 10 11 07 12 42 6.0 -9 686.30 -52.0 -50.7 -51.9 74 -99 SPO 1997 10 11 07 13 39 5.8 -9 686.40 -52.0 -50.8 -51.9 74 -99 SPO 1997 10 11 07 14 39 6.0 -9 686.40 -51.9 -50.8 -51.9 73 -99 SPO 1997 10 11 07 15 40 6.1 -9 686.30 -51.9 -50.8 -51.9 73 -99 SPO 1997 10 11 07 16 41 6.0 -9 686.30 -51.9 -50.8 -51.9 72 -99 SPO 1997 10 11 07 17 39 6.2 -9 686.30 -52.0 -50.9 -51.9 73 -99 SPO 1997 10 11 07 18 41 6.5 -9 686.30 -52.0 -50.8 -51.9 73 -99 SPO 1997 10 11 07 19 40 6.5 -9 686.30 -51.9 -50.8 -51.9 71 -99 SPO 1997 10 11 07 20 41 6.4 -9 686.30 -51.9 -50.9 -51.9 71 -99 SPO 1997 10 11 07 21 41 6.1 -9 686.30 -51.9 -50.9 -51.9 72 -99 SPO 1997 10 11 07 22 38 6.0 -9 686.30 -51.9 -51.0 -51.9 72 -99 SPO 1997 10 11 07 23 40 6.3 -9 686.30 -52.0 -51.0 -51.9 74 -99 SPO 1997 10 11 07 24 38 6.2 -9 686.40 -52.0 -50.9 -51.9 73 -99 SPO 1997 10 11 07 25 38 6.2 -9 686.30 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 26 38 6.2 -9 686.30 -52.0 -51.1 -51.9 73 -99 SPO 1997 10 11 07 27 39 6.4 -9 686.40 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 28 38 6.0 -9 686.40 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 29 39 5.8 -9 686.40 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 30 39 5.5 -9 686.50 -52.0 -50.9 -52.0 73 -99 SPO 1997 10 11 07 31 39 5.5 -9 686.50 -52.0 -50.9 -52.0 73 -99 SPO 1997 10 11 07 32 39 5.5 -9 686.50 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 33 40 5.6 -9 686.50 -52.0 -51.0 -51.9 73 -99 SPO 1997 10 11 07 34 41 5.3 -9 686.50 -52.2 -51.0 -52.0 75 -99 SPO 1997 10 11 07 35 42 5.5 -9 686.50 -52.2 -51.0 -52.0 75 -99 SPO 1997 10 11 07 36 43 5.5 -9 686.50 -52.2 -51.1 -52.1 74 -99 SPO 1997 10 11 07 37 45 5.7 -9 686.40 -52.2 -51.0 -52.1 74 -99 SPO 1997 10 11 07 38 44 5.7 -9 686.40 -52.2 -51.0 -52.1 74 -99 SPO 1997 10 11 07 39 42 5.7 -9 686.40 -52.2 -51.1 -52.2 73 -99 SPO 1997 10 11 07 40 41 5.9 -9 686.40 -52.4 -51.0 -52.2 73 -99 SPO 1997 10 11 07 41 40 6.0 -9 686.40 -52.4 -51.0 -52.2 72 -99 SPO 1997 10 11 07 42 40 6.0 -9 686.40 -52.4 -51.0 -52.2 72 -99 SPO 1997 10 11 07 43 39 6.0 -9 686.40 -52.4 -50.9 -52.2 72 -99 SPO 1997 10 11 07 44 38 6.2 -9 686.40 -52.5 -50.8 -52.3 73 -99 SPO 1997 10 11 07 45 37 6.3 -9 686.40 -52.5 -50.6 -52.3 73 -99 SPO 1997 10 11 07 46 36 6.5 -9 686.40 -52.5 -50.2 -52.4 73 -99 SPO 1997 10 11 07 47 36 6.6 -9 686.40 -52.5 -50.0 -52.4 73 -99 SPO 1997 10 11 07 48 37 6.6 -9 686.40 -52.5 -49.8 -52.4 72 -99 SPO 1997 10 11 07 49 37 6.6 -9 686.40 -52.5 -49.9 -52.4 72 -99 SPO 1997 10 11 07 50 39 6.5 -9 686.40 -52.5 -49.9 -52.4 71 -99 SPO 1997 10 11 07 51 41 6.1 -9 686.40 -52.5 -50.2 -52.4 71 -99 SPO 1997 10 11 07 52 40 5.7 -9 686.40 -52.5 -50.5 -52.4 70 -99 SPO 1997 10 11 07 53 39 6.0 -9 686.40 -52.7 -50.6 -52.5 72 -99 SPO 1997 10 11 07 54 38 6.2 -9 686.50 -52.7 -50.4 -52.5 72 -99 SPO 1997 10 11 07 55 39 6.2 -9 686.50 -52.7 -50.4 -52.5 71 -99 SPO 1997 10 11 07 56 38 6.3 -9 686.50 -52.7 -50.4 -52.5 72 -99 SPO 1997 10 11 07 57 38 6.3 -9 686.50 -52.7 -50.5 -52.5 72 -99 SPO 1997 10 11 07 58 39 6.0 -9 686.50 -52.7 -50.6 -52.5 72 -99 SPO 1997 10 11 07 59 41 5.8 -9 686.50 -52.7 -50.7 -52.6 72 -99 SPO 1997 10 11 08 00 43 5.8 -9 686.50 -52.7 -50.6 -52.6 71 0 SPO 1997 10 11 08 01 41 5.6 -9 686.60 -52.7 -50.6 -52.7 71 -99 SPO 1997 10 11 08 02 43 5.3 -9 686.60 -52.7 -50.8 -52.7 71 -99 SPO 1997 10 11 08 03 47 5.0 -9 686.60 -52.9 -50.9 -52.7 73 -99 SPO 1997 10 11 08 04 47 4.8 -9 686.70 -52.9 -50.9 -52.7 72 -99 SPO 1997 10 11 08 05 49 4.5 -9 686.70 -53.0 -51.0 -52.8 72 -99 SPO 1997 10 11 08 06 49 4.4 -9 686.70 -53.0 -51.0 -52.9 72 -99 SPO 1997 10 11 08 07 50 4.0 -9 686.70 -53.0 -51.2 -52.9 71 -99 SPO 1997 10 11 08 08 50 3.9 -9 686.70 -53.2 -51.4 -53.0 73 -99 SPO 1997 10 11 08 09 51 3.9 -9 686.70 -53.2 -51.5 -53.0 73 -99 SPO 1997 10 11 08 10 51 4.0 -9 686.70 -53.4 -51.5 -53.1 74 -99 SPO 1997 10 11 08 11 51 4.2 -9 686.70 -53.4 -51.5 -53.1 74 -99 SPO 1997 10 11 08 12 48 4.4 -9 686.70 -53.4 -51.4 -53.2 73 -99 SPO 1997 10 11 08 13 46 4.4 -9 686.70 -53.4 -51.3 -53.2 73 -99 SPO 1997 10 11 08 14 46 4.2 -9 686.70 -53.4 -51.3 -53.2 73 -99 SPO 1997 10 11 08 15 47 4.2 -9 686.70 -53.4 -51.3 -53.2 72 -99 SPO 1997 10 11 08 16 45 4.1 -9 686.80 -53.4 -51.4 -53.2 72 -99 SPO 1997 10 11 08 17 45 4.2 -9 686.80 -53.4 -51.4 -53.2 71 -99 SPO 1997 10 11 08 18 44 4.0 -9 686.80 -53.4 -51.3 -53.2 71 -99 SPO 1997 10 11 08 19 42 3.8 -9 686.80 -53.5 -51.4 -53.3 73 -99 SPO 1997 10 11 08 20 46 3.6 -9 686.80 -53.5 -51.6 -53.3 73 -99 SPO 1997 10 11 08 21 50 3.5 -9 686.80 -53.5 -51.6 -53.4 72 -99 SPO 1997 10 11 08 22 55 3.2 -9 686.90 -53.7 -51.7 -53.4 73 -99 SPO 1997 10 11 08 23 63 3.1 -9 686.80 -53.7 -51.8 -53.4 73 -99 SPO 1997 10 11 08 24 65 2.8 -9 686.80 -54.0 -52.0 -53.5 76 -99 SPO 1997 10 11 08 25 66 2.8 -9 686.80 -54.2 -52.1 -53.6 78 -99 SPO 1997 10 11 08 26 66 3.0 -9 686.80 -54.2 -52.0 -53.7 77 -99 SPO 1997 10 11 08 27 62 3.3 -9 686.80 -54.2 -52.0 -53.7 75 -99 SPO 1997 10 11 08 28 60 3.6 -9 686.80 -54.2 -51.9 -53.7 75 -99 SPO 1997 10 11 08 29 56 4.0 -9 686.80 -54.2 -51.7 -53.7 74 -99 SPO 1997 10 11 08 30 52 4.4 -9 686.80 -54.0 -51.5 -53.8 72 -99 SPO 1997 10 11 08 31 48 4.8 -9 686.80 -54.0 -51.3 -53.7 72 -99 SPO 1997 10 11 08 32 46 5.1 -9 686.80 -53.9 -51.2 -53.7 71 -99 SPO 1997 10 11 08 33 47 5.4 -9 686.80 -53.7 -51.1 -53.6 70 -99 SPO 1997 10 11 08 34 46 5.6 -9 686.80 -53.5 -51.2 -53.4 68 -99 SPO 1997 10 11 08 35 46 5.4 -9 686.80 -53.5 -51.2 -53.4 69 -99 SPO 1997 10 11 08 36 48 5.5 -9 686.80 -53.5 -51.2 -53.4 69 -99 SPO 1997 10 11 08 37 51 5.9 -9 686.80 -53.5 -51.0 -53.4 70 -99 SPO 1997 10 11 08 38 50 5.7 -9 686.80 -53.5 -50.8 -53.4 70 -99 SPO 1997 10 11 08 39 48 5.3 -9 686.80 -53.5 -50.9 -53.5 69 -99 SPO 1997 10 11 08 40 45 5.0 -9 686.90 -53.7 -51.1 -53.6 72 -99 SPO 1997 10 11 08 41 44 4.8 -9 686.90 -53.9 -51.3 -53.7 73 -99 SPO 1997 10 11 08 42 46 5.0 -9 686.90 -53.9 -51.4 -53.7 73 -99 SPO 1997 10 11 08 43 48 5.2 -9 686.90 -53.9 -51.1 -53.7 72 -99 SPO 1997 10 11 08 44 49 5.0 -9 686.90 -53.7 -51.0 -53.6 71 -99 SPO 1997 10 11 08 45 50 5.0 -9 686.90 -54.0 -50.8 -53.7 73 -99 SPO 1997 10 11 08 46 49 5.3 -9 686.90 -54.0 -50.6 -53.8 73 -99 SPO 1997 10 11 08 47 45 5.0 -9 686.90 -54.0 -50.7 -53.9 73 -99 SPO 1997 10 11 08 48 45 5.3 -9 686.90 -54.2 -50.7 -53.9 75 -99 SPO 1997 10 11 08 49 47 5.8 -9 686.90 -54.0 -50.7 -53.8 72 -99 SPO 1997 10 11 08 50 46 6.0 -9 686.90 -54.0 -50.6 -53.8 72 -99 SPO 1997 10 11 08 51 47 6.0 -9 686.90 -54.0 -50.5 -53.8 72 -99 SPO 1997 10 11 08 52 48 6.0 -9 686.90 -54.0 -50.6 -53.8 72 -99 SPO 1997 10 11 08 53 45 5.9 -9 686.90 -54.0 -50.7 -53.9 71 -99 SPO 1997 10 11 08 54 43 5.9 -9 686.90 -54.2 -50.8 -54.0 72 -99 SPO 1997 10 11 08 55 44 5.9 -9 687.00 -54.2 -50.8 -54.0 72 -99 SPO 1997 10 11 08 56 44 6.1 -9 687.00 -54.2 -50.9 -54.0 72 -99 SPO 1997 10 11 08 57 45 6.2 -9 687.00 -54.2 -51.0 -54.0 72 -99 SPO 1997 10 11 08 58 44 6.1 -9 687.00 -54.0 -51.0 -53.9 70 -99 SPO 1997 10 11 08 59 43 6.2 -9 687.00 -54.0 -51.0 -53.9 71 -99 SPO 1997 10 11 09 00 43 6.2 -9 687.00 -54.2 -51.0 -53.9 72 0 SPO 1997 10 11 09 01 43 6.2 -9 687.00 -54.0 -50.9 -54.0 71 -99 SPO 1997 10 11 09 02 43 6.3 -9 687.00 -54.2 -51.0 -54.0 72 -99 SPO 1997 10 11 09 03 43 6.2 -9 687.00 -54.2 -51.0 -54.0 72 -99 SPO 1997 10 11 09 04 42 6.0 -9 687.00 -54.2 -51.1 -54.0 71 -99 SPO 1997 10 11 09 05 41 5.9 -9 687.00 -54.2 -51.2 -54.1 70 -99 SPO 1997 10 11 09 06 43 5.9 -9 687.00 -54.2 -51.0 -54.1 69 -99 SPO 1997 10 11 09 07 44 5.7 -9 687.00 -54.2 -51.0 -54.1 70 -99 SPO 1997 10 11 09 08 44 5.7 -9 687.00 -54.2 -51.0 -54.1 70 -99 SPO 1997 10 11 09 09 44 5.6 -9 687.00 -54.2 -51.1 -54.2 70 -99 SPO 1997 10 11 09 10 43 5.5 -9 687.10 -54.4 -51.2 -54.2 72 -99 SPO 1997 10 11 09 11 44 5.2 -9 687.10 -54.4 -51.3 -54.2 73 -99 SPO 1997 10 11 09 12 44 5.0 -9 687.10 -54.4 -51.4 -54.1 73 -99 SPO 1997 10 11 09 13 44 4.7 -9 687.20 -54.4 -51.4 -54.1 73 -99 SPO 1997 10 11 09 14 48 4.5 -9 687.20 -54.4 -51.4 -54.2 73 -99 SPO 1997 10 11 09 15 53 4.6 -9 687.20 -54.4 -51.5 -54.2 72 -99 SPO 1997 10 11 09 16 55 4.4 -9 687.20 -54.5 -51.6 -54.2 72 -99 SPO 1997 10 11 09 17 53 4.0 -9 687.20 -54.4 -51.6 -54.2 72 -99 SPO 1997 10 11 09 18 50 3.7 -9 687.30 -54.5 -51.7 -54.2 72 -99 SPO 1997 10 11 09 19 52 3.6 -9 687.30 -54.5 -51.7 -54.2 72 -99 SPO 1997 10 11 09 20 53 3.4 -9 687.30 -54.5 -51.7 -54.2 73 -99 SPO 1997 10 11 09 21 51 3.4 -9 687.40 -54.5 -51.7 -54.2 74 -99 SPO 1997 10 11 09 22 53 3.2 -9 687.40 -54.5 -51.7 -54.2 74 -99 SPO 1997 10 11 09 23 54 3.1 -9 687.40 -54.5 -51.6 -54.2 74 -99 SPO 1997 10 11 09 24 57 3.1 -9 687.50 -54.5 -51.7 -54.2 74 -99 SPO 1997 10 11 09 25 60 2.8 -9 687.50 -54.7 -51.8 -54.0 76 -99 SPO 1997 10 11 09 26 67 2.7 -9 687.50 -54.7 -51.8 -54.1 75 -99 SPO 1997 10 11 09 27 80 2.3 -9 687.50 -54.7 -52.0 -54.2 75 -99 SPO 1997 10 11 09 28 96 1.9 -9 687.50 -54.7 -52.2 -54.2 75 -99 SPO 1997 10 11 09 29 110 1.7 -9 687.50 -55.0 -52.6 -54.4 77 -99 SPO 1997 10 11 09 30 98 1.7 -9 687.50 -55.2 -52.9 -54.5 79 -99 SPO 1997 10 11 09 31 82 2.0 -9 687.50 -55.5 -53.0 -54.7 82 -99 SPO 1997 10 11 09 32 70 2.6 -9 687.50 -55.7 -52.6 -54.8 82 -99 SPO 1997 10 11 09 33 63 3.3 -9 687.40 -55.9 -52.2 -54.8 83 -99 SPO 1997 10 11 09 34 58 3.6 -9 687.40 -55.7 -51.8 -54.8 81 -99 SPO 1997 10 11 09 35 54 3.6 -9 687.40 -55.7 -51.5 -54.8 80 -99 SPO 1997 10 11 09 36 53 3.4 -9 687.40 -55.5 -51.4 -54.8 78 -99 SPO 1997 10 11 09 37 54 3.3 -9 687.50 -55.5 -51.3 -54.7 77 -99 SPO 1997 10 11 09 38 59 3.0 -9 687.50 -55.5 -51.3 -54.5 77 -99 SPO 1997 10 11 09 39 67 2.6 -9 687.60 -55.5 -51.4 -54.4 76 -99 SPO 1997 10 11 09 40 77 2.3 -9 687.60 -55.5 -51.5 -54.5 77 -99 SPO 1997 10 11 09 41 90 2.1 -9 687.60 -55.2 -51.6 -54.4 75 -99 SPO 1997 10 11 09 42 90 2.2 -9 687.60 -55.2 -51.7 -54.4 75 -99 SPO 1997 10 11 09 43 84 2.5 -9 687.60 -55.2 -51.8 -54.4 77 -99 SPO 1997 10 11 09 44 77 2.9 -9 687.60 -55.2 -51.8 -54.4 79 -99 SPO 1997 10 11 09 45 72 3.2 -9 687.50 -55.5 -51.8 -54.4 82 -99 SPO 1997 10 11 09 46 64 3.5 -9 687.50 -55.4 -51.7 -54.3 82 -99 SPO 1997 10 11 09 47 62 3.9 -9 687.40 -55.0 -51.6 -54.2 78 -99 SPO 1997 10 11 09 48 57 4.6 -9 687.40 -54.5 -51.6 -54.0 73 -99 SPO 1997 10 11 09 49 55 4.5 -9 687.40 -54.4 -51.5 -53.8 74 -99 SPO 1997 10 11 09 50 54 4.9 -9 687.40 -54.4 -51.2 -53.9 75 -99 SPO 1997 10 11 09 51 54 5.0 -9 687.40 -54.4 -51.0 -53.9 76 -99 SPO 1997 10 11 09 52 54 5.2 -9 687.40 -54.4 -50.9 -54.0 77 -99 SPO 1997 10 11 09 53 54 5.4 -9 687.40 -54.5 -50.9 -54.1 78 -99 SPO 1997 10 11 09 54 55 5.4 -9 687.40 -54.7 -50.9 -54.2 80 -99 SPO 1997 10 11 09 55 55 5.4 -9 687.40 -54.7 -50.8 -54.2 79 -99 SPO 1997 10 11 09 56 56 5.3 -9 687.50 -54.7 -50.8 -54.2 78 -99 SPO 1997 10 11 09 57 59 5.1 -9 687.50 -54.7 -50.8 -54.2 77 -99 SPO 1997 10 11 09 58 61 4.8 -9 687.50 -54.7 -50.9 -54.2 77 -99 SPO 1997 10 11 09 59 65 4.6 -9 687.50 -54.7 -51.0 -54.2 77 -99 SPO 1997 10 11 10 00 70 4.7 -9 687.50 -54.7 -51.0 -54.1 76 0 SPO 1997 10 11 10 01 71 4.5 -9 687.50 -54.9 -51.2 -54.1 78 -99 SPO 1997 10 11 10 02 75 4.1 -9 687.50 -55.0 -51.4 -54.1 79 -99 SPO 1997 10 11 10 03 75 3.9 -9 687.50 -55.0 -51.4 -54.0 79 -99 SPO 1997 10 11 10 04 74 3.7 -9 687.60 -55.0 -51.6 -54.0 78 -99 SPO 1997 10 11 10 05 71 3.9 -9 687.60 -55.2 -51.5 -54.0 80 -99 SPO 1997 10 11 10 06 68 4.2 -9 687.60 -55.2 -51.5 -54.1 79 -99 SPO 1997 10 11 10 07 66 4.5 -9 687.50 -55.2 -51.5 -54.2 79 -99 SPO 1997 10 11 10 08 60 4.8 -9 687.50 -55.2 -51.6 -54.4 78 -99 SPO 1997 10 11 10 09 58 5.0 -9 687.50 -55.2 -51.4 -54.4 79 -99 SPO 1997 10 11 10 10 54 5.1 -9 687.50 -55.0 -51.3 -54.4 77 -99 SPO 1997 10 11 10 11 53 5.6 -9 687.40 -55.0 -51.0 -54.3 78 -99 SPO 1997 10 11 10 12 51 5.4 -9 687.40 -54.9 -51.1 -54.2 77 -99 SPO 1997 10 11 10 13 50 5.6 -9 687.50 -54.7 -51.0 -54.1 76 -99 SPO 1997 10 11 10 14 50 5.3 -9 687.50 -54.5 -51.0 -54.1 74 -99 SPO 1997 10 11 10 15 52 5.2 -9 687.50 -54.5 -50.9 -54.0 75 -99 SPO 1997 10 11 10 16 53 5.0 -9 687.50 -54.5 -50.9 -54.0 74 -99 SPO 1997 10 11 10 17 55 4.8 -9 687.50 -54.7 -51.0 -54.1 76 -99 SPO 1997 10 11 10 18 59 4.6 -9 687.50 -54.7 -51.1 -54.1 76 -99 SPO 1997 10 11 10 19 61 4.4 -9 687.50 -54.7 -51.3 -54.1 76 -99 SPO 1997 10 11 10 20 63 4.2 -9 687.60 -54.7 -51.4 -54.0 76 -99 SPO 1997 10 11 10 21 64 4.2 -9 687.60 -54.7 -51.4 -53.9 77 -99 SPO 1997 10 11 10 22 62 4.3 -9 687.60 -54.7 -51.4 -53.9 78 -99 SPO 1997 10 11 10 23 57 4.4 -9 687.60 -54.7 -51.4 -54.0 78 -99 SPO 1997 10 11 10 24 54 4.8 -9 687.50 -54.7 -51.4 -54.0 78 -99 SPO 1997 10 11 10 25 52 5.2 -9 687.50 -54.7 -51.2 -54.0 79 -99 SPO 1997 10 11 10 26 51 5.5 -9 687.40 -54.7 -51.1 -54.0 79 -99 SPO 1997 10 11 10 27 48 5.6 -9 687.40 -54.7 -51.0 -54.0 79 -99 SPO 1997 10 11 10 28 45 5.8 -9 687.40 -54.7 -51.0 -53.9 79 -99 SPO 1997 10 11 10 29 45 5.9 -9 687.40 -54.5 -50.8 -53.9 77 -99 SPO 1997 10 11 10 30 45 6.0 -9 687.40 -54.5 -50.6 -53.8 77 -99 SPO 1997 10 11 10 31 45 6.2 -9 687.40 -54.5 -50.5 -53.8 77 -99 SPO 1997 10 11 10 32 44 6.2 -9 687.40 -54.4 -50.5 -53.8 76 -99 SPO 1997 10 11 10 33 44 6.2 -9 687.40 -54.5 -50.5 -53.8 78 -99 SPO 1997 10 11 10 34 44 6.3 -9 687.40 -54.5 -50.6 -53.9 78 -99 SPO 1997 10 11 10 35 45 6.5 -9 687.40 -54.5 -50.6 -53.9 78 -99 SPO 1997 10 11 10 36 44 6.5 -9 687.40 -54.5 -50.5 -53.8 78 -99 SPO 1997 10 11 10 37 43 6.6 -9 687.40 -54.4 -50.5 -53.8 77 -99 SPO 1997 10 11 10 38 43 6.5 -9 687.30 -54.4 -50.4 -53.7 77 -99 SPO 1997 10 11 10 39 42 6.5 -9 687.30 -54.4 -50.5 -53.7 77 -99 SPO 1997 10 11 10 40 42 6.4 -9 687.30 -54.4 -50.5 -53.7 78 -99 SPO 1997 10 11 10 41 43 6.3 -9 687.30 -54.4 -50.5 -53.7 77 -99 SPO 1997 10 11 10 42 44 6.3 -9 687.30 -54.4 -50.4 -53.6 77 -99 SPO 1997 10 11 10 43 43 6.1 -9 687.40 -54.2 -50.4 -53.6 75 -99 SPO 1997 10 11 10 44 42 5.9 -9 687.40 -54.2 -50.4 -53.5 75 -99 SPO 1997 10 11 10 45 42 5.8 -9 687.40 -54.0 -50.4 -53.4 73 -99 SPO 1997 10 11 10 46 43 5.6 -9 687.40 -54.0 -50.4 -53.4 75 -99 SPO 1997 10 11 10 47 43 5.3 -9 687.40 -54.0 -50.4 -53.4 75 -99 SPO 1997 10 11 10 48 44 5.1 -9 687.40 -54.0 -50.5 -53.4 76 -99 SPO 1997 10 11 10 49 46 5.0 -9 687.40 -54.2 -50.5 -53.4 79 -99 SPO 1997 10 11 10 50 46 4.9 -9 687.40 -54.2 -50.5 -53.4 79 -99 SPO 1997 10 11 10 51 46 4.9 -9 687.50 -54.2 -50.6 -53.3 79 -99 SPO 1997 10 11 10 52 48 4.8 -9 687.50 -54.0 -50.7 -53.3 78 -99 SPO 1997 10 11 10 53 50 4.7 -9 687.50 -54.0 -50.7 -53.3 78 -99 SPO 1997 10 11 10 54 52 4.8 -9 687.40 -54.0 -50.8 -53.3 78 -99 SPO 1997 10 11 10 55 53 4.6 -9 687.50 -54.0 -51.0 -53.3 78 -99 SPO 1997 10 11 10 56 54 4.4 -9 687.50 -54.2 -51.1 -53.3 80 -99 SPO 1997 10 11 10 57 56 4.0 -9 687.50 -54.2 -51.2 -53.3 80 -99 SPO 1997 10 11 10 58 58 3.9 -9 687.50 -54.2 -51.4 -53.2 81 -99 SPO 1997 10 11 10 59 60 3.7 -9 687.60 -54.2 -51.6 -53.0 81 -99 SPO 1997 10 11 11 00 60 3.7 -9 687.60 -54.2 -51.7 -53.0 81 0 SPO 1997 10 11 11 01 61 3.7 -9 687.60 -54.2 -51.8 -52.9 80 -99 SPO 1997 10 11 11 02 60 3.8 -9 687.60 -54.2 -51.8 -53.0 80 -99 SPO 1997 10 11 11 03 58 4.0 -9 687.60 -54.2 -51.7 -53.2 81 -99 SPO 1997 10 11 11 04 56 4.3 -9 687.60 -54.4 -51.6 -53.3 83 -99 SPO 1997 10 11 11 05 54 4.5 -9 687.50 -54.4 -51.6 -53.4 83 -99 SPO 1997 10 11 11 06 51 4.8 -9 687.60 -54.5 -51.4 -53.5 84 -99 SPO 1997 10 11 11 07 50 5.0 -9 687.50 -54.5 -51.3 -53.6 83 -99 SPO 1997 10 11 11 08 49 5.2 -9 687.60 -54.5 -51.2 -53.6 82 -99 SPO 1997 10 11 11 09 48 5.2 -9 687.60 -54.4 -51.2 -53.6 80 -99 SPO 1997 10 11 11 10 47 5.3 -9 687.60 -54.4 -51.2 -53.6 80 -99 SPO 1997 10 11 11 11 46 5.1 -9 687.60 -54.4 -51.4 -53.6 79 -99 SPO 1997 10 11 11 12 47 4.9 -9 687.60 -54.4 -51.4 -53.6 78 -99 SPO 1997 10 11 11 13 47 4.8 -9 687.60 -54.4 -51.2 -53.6 78 -99 SPO 1997 10 11 11 14 48 4.7 -9 687.60 -54.5 -51.1 -53.7 79 -99 SPO 1997 10 11 11 15 48 4.8 -9 687.60 -54.5 -51.2 -53.7 79 -99 SPO 1997 10 11 11 16 47 5.0 -9 687.60 -54.5 -51.3 -53.7 79 -99 SPO 1997 10 11 11 17 47 5.1 -9 687.60 -54.5 -51.2 -53.7 79 -99 SPO 1997 10 11 11 18 47 5.1 -9 687.60 -54.5 -51.1 -53.7 79 -99 SPO 1997 10 11 11 19 47 5.1 -9 687.60 -54.5 -51.2 -53.7 79 -99 SPO 1997 10 11 11 20 47 5.3 -9 687.60 -54.5 -51.1 -53.7 79 -99 SPO 1997 10 11 11 21 47 5.2 -9 687.60 -54.4 -51.1 -53.7 77 -99 SPO 1997 10 11 11 22 47 5.3 -9 687.70 -54.5 -51.1 -53.8 78 -99 SPO 1997 10 11 11 23 47 5.4 -9 687.60 -54.5 -51.0 -53.8 77 -99 SPO 1997 10 11 11 24 46 5.5 -9 687.60 -54.5 -50.9 -53.8 77 -99 SPO 1997 10 11 11 25 45 5.5 -9 687.70 -54.5 -50.8 -53.8 78 -99 SPO 1997 10 11 11 26 45 5.6 -9 687.70 -54.7 -50.8 -53.9 79 -99 SPO 1997 10 11 11 27 44 5.7 -9 687.70 -54.5 -50.8 -53.9 77 -99 SPO 1997 10 11 11 28 44 5.7 -9 687.70 -54.5 -50.7 -53.9 77 -99 SPO 1997 10 11 11 29 45 5.6 -9 687.70 -54.5 -50.7 -53.9 77 -99 SPO 1997 10 11 11 30 45 5.7 -9 687.70 -54.5 -50.7 -53.9 77 -99 SPO 1997 10 11 11 31 45 5.7 -9 687.70 -54.5 -50.6 -53.9 76 -99 SPO 1997 10 11 11 32 45 5.7 -9 687.70 -54.5 -50.6 -53.9 75 -99 SPO 1997 10 11 11 33 44 5.7 -9 687.70 -54.7 -50.6 -53.9 77 -99 SPO 1997 10 11 11 34 43 5.7 -9 687.70 -54.7 -50.8 -54.0 76 -99 SPO 1997 10 11 11 35 43 5.8 -9 687.70 -54.7 -50.8 -54.0 76 -99 SPO 1997 10 11 11 36 43 5.8 -9 687.70 -54.7 -50.9 -54.0 77 -99 SPO 1997 10 11 11 37 44 5.9 -9 687.70 -54.7 -50.9 -54.0 78 -99 SPO 1997 10 11 11 38 45 6.0 -9 687.70 -54.7 -50.9 -54.0 78 -99 SPO 1997 10 11 11 39 45 6.2 -9 687.70 -54.7 -50.8 -54.1 78 -99 SPO 1997 10 11 11 40 44 6.3 -9 687.60 -54.7 -50.8 -54.1 78 -99 SPO 1997 10 11 11 41 44 6.3 -9 687.60 -54.7 -50.8 -54.1 78 -99 SPO 1997 10 11 11 42 43 6.3 -9 687.60 -54.7 -50.8 -54.1 78 -99 SPO 1997 10 11 11 43 43 6.4 -9 687.60 -54.7 -50.8 -54.1 78 -99 SPO 1997 10 11 11 44 42 6.6 -9 687.60 -54.7 -50.6 -54.1 77 -99 SPO 1997 10 11 11 45 41 6.6 -9 687.60 -54.7 -50.6 -54.0 77 -99 SPO 1997 10 11 11 46 40 6.6 -9 687.60 -54.5 -50.6 -54.0 74 -99 SPO 1997 10 11 11 47 41 6.5 -9 687.60 -54.5 -50.4 -53.9 74 -99 SPO 1997 10 11 11 48 42 6.2 -9 687.60 -54.5 -50.6 -53.9 75 -99 SPO 1997 10 11 11 49 44 6.5 -9 687.60 -54.4 -50.2 -53.8 75 -99 SPO 1997 10 11 11 50 44 6.5 -9 687.60 -54.2 -50.2 -53.7 74 -99 SPO 1997 10 11 11 51 43 6.4 -9 687.60 -54.2 -50.5 -53.6 75 -99 SPO 1997 10 11 11 52 43 6.0 -9 687.60 -54.2 -50.6 -53.6 76 -99 SPO 1997 10 11 11 53 42 5.9 -9 687.60 -54.2 -50.6 -53.6 77 -99 SPO 1997 10 11 11 54 41 6.3 -9 687.60 -54.2 -50.6 -53.6 77 -99 SPO 1997 10 11 11 55 41 6.0 -9 687.60 -54.2 -50.6 -53.6 77 -99 SPO 1997 10 11 11 56 39 5.9 -9 687.60 -54.2 -51.0 -53.5 77 -99 SPO 1997 10 11 11 57 40 6.1 -9 687.60 -54.2 -50.9 -53.5 77 -99 SPO 1997 10 11 11 58 40 6.1 -9 687.60 -54.2 -51.0 -53.5 77 -99 SPO 1997 10 11 11 59 43 6.1 -9 687.60 -54.2 -50.8 -53.6 77 -99 SPO 1997 10 11 12 00 42 6.0 -9 687.70 -54.2 -50.9 -53.7 78 0 SPO 1997 10 11 12 01 43 5.8 -9 687.70 -54.2 -51.0 -53.7 78 -99 SPO 1997 10 11 12 02 44 5.6 -9 687.70 -54.4 -51.1 -53.7 80 -99 SPO 1997 10 11 12 03 44 5.5 -9 687.70 -54.4 -51.2 -53.7 80 -99 SPO 1997 10 11 12 04 45 5.5 -9 687.70 -54.4 -51.2 -53.7 79 -99 SPO 1997 10 11 12 05 47 5.5 -9 687.70 -54.5 -51.2 -53.8 80 -99 SPO 1997 10 11 12 06 46 5.3 -9 687.70 -54.4 -51.4 -53.8 79 -99 SPO 1997 10 11 12 07 46 5.3 -9 687.70 -54.5 -51.5 -53.8 80 -99 SPO 1997 10 11 12 08 45 4.9 -9 687.70 -54.5 -51.6 -53.8 79 -99 SPO 1997 10 11 12 09 46 4.9 -9 687.70 -54.5 -51.7 -53.8 78 -99 SPO 1997 10 11 12 10 45 4.7 -9 687.80 -54.5 -51.7 -53.8 78 -99 SPO 1997 10 11 12 11 46 4.7 -9 687.80 -54.5 -51.4 -53.8 78 -99 SPO 1997 10 11 12 12 44 4.4 -9 687.80 -54.5 -51.8 -53.8 78 -99 SPO 1997 10 11 12 13 46 4.2 -9 687.80 -54.5 -51.8 -53.8 78 -99 SPO 1997 10 11 12 14 46 4.4 -9 687.70 -54.5 -51.8 -53.8 78 -99 SPO 1997 10 11 12 15 48 4.6 -9 687.70 -54.5 -51.7 -53.8 78 -99 SPO 1997 10 11 12 16 48 4.5 -9 687.80 -54.5 -51.6 -53.8 78 -99 SPO 1997 10 11 12 17 51 4.6 -9 687.80 -54.7 -51.6 -53.8 80 -99 SPO 1997 10 11 12 18 52 4.7 -9 687.80 -54.7 -51.5 -53.8 80 -99 SPO 1997 10 11 12 19 52 4.6 -9 687.80 -54.5 -51.7 -53.8 79 -99 SPO 1997 10 11 12 20 53 4.4 -9 687.80 -54.7 -51.8 -53.9 81 -99 SPO 1997 10 11 12 21 52 4.4 -9 687.80 -54.7 -51.8 -53.8 81 -99 SPO 1997 10 11 12 22 51 4.1 -9 687.90 -54.7 -51.8 -53.8 80 -99 SPO 1997 10 11 12 23 52 4.3 -9 687.80 -54.7 -51.6 -53.8 80 -99 SPO 1997 10 11 12 24 51 4.1 -9 687.80 -54.7 -51.8 -53.8 81 -99 SPO 1997 10 11 12 25 51 4.5 -9 687.80 -54.7 -51.6 -53.9 81 -99 SPO 1997 10 11 12 26 48 4.6 -9 687.80 -54.7 -51.7 -53.9 81 -99 SPO 1997 10 11 12 27 47 4.9 -9 687.80 -54.7 -51.7 -53.9 81 -99 SPO 1997 10 11 12 28 46 4.9 -9 687.80 -54.7 -51.6 -54.0 81 -99 SPO 1997 10 11 12 29 43 5.3 -9 687.80 -54.7 -51.4 -53.9 80 -99 SPO 1997 10 11 12 30 41 5.6 -9 687.80 -54.5 -51.4 -53.8 79 -99 SPO 1997 10 11 12 31 45 5.5 -9 687.80 -54.2 -51.4 -53.5 76 -99 SPO 1997 10 11 12 32 45 5.5 -9 687.80 -54.2 -51.4 -53.6 77 -99 SPO 1997 10 11 12 33 45 5.6 -9 687.80 -54.4 -51.6 -53.8 79 -99 SPO 1997 10 11 12 34 45 5.7 -9 687.80 -54.5 -51.3 -53.9 80 -99 SPO 1997 10 11 12 35 44 5.6 -9 687.80 -54.5 -51.5 -53.8 79 -99 SPO 1997 10 11 12 36 45 5.4 -9 687.80 -54.4 -51.5 -53.8 78 -99 SPO 1997 10 11 12 37 44 5.2 -9 687.80 -54.4 -51.5 -53.8 77 -99 SPO 1997 10 11 12 38 44 5.2 -9 687.90 -54.4 -51.6 -53.8 78 -99 SPO 1997 10 11 12 39 46 5.0 -9 687.90 -54.5 -51.7 -53.9 79 -99 SPO 1997 10 11 12 40 46 5.0 -9 687.90 -54.5 -51.6 -53.9 79 -99 SPO 1997 10 11 12 41 45 4.9 -9 687.90 -54.5 -51.6 -53.9 79 -99 SPO 1997 10 11 12 42 46 4.9 -9 687.90 -54.5 -51.5 -53.9 79 -99 SPO 1997 10 11 12 43 47 4.8 -9 687.90 -54.5 -51.6 -54.0 80 -99 SPO 1997 10 11 12 44 47 5.0 -9 687.90 -54.5 -51.7 -54.0 80 -99 SPO 1997 10 11 12 45 47 5.1 -9 687.90 -54.5 -51.7 -54.1 79 -99 SPO 1997 10 11 12 46 47 5.1 -9 687.90 -54.7 -51.7 -54.2 81 -99 SPO 1997 10 11 12 47 46 5.2 -9 687.90 -54.7 -51.5 -54.2 80 -99 SPO 1997 10 11 12 48 44 5.2 -9 687.90 -54.7 -51.5 -54.2 78 -99 SPO 1997 10 11 12 49 44 5.4 -9 687.90 -54.7 -51.5 -54.3 78 -99 SPO 1997 10 11 12 50 44 5.2 -9 687.90 -54.7 -51.6 -54.3 78 -99 SPO 1997 10 11 12 51 43 5.2 -9 687.90 -54.7 -51.6 -54.3 78 -99 SPO 1997 10 11 12 52 43 5.2 -9 687.90 -54.7 -51.5 -54.3 78 -99 SPO 1997 10 11 12 53 44 5.1 -9 687.90 -54.7 -51.6 -54.3 78 -99 SPO 1997 10 11 12 54 44 4.8 -9 687.90 -54.7 -51.7 -54.4 78 -99 SPO 1997 10 11 12 55 46 4.5 -9 687.90 -54.9 -51.6 -54.4 80 -99 SPO 1997 10 11 12 56 49 4.4 -9 687.90 -54.9 -51.6 -54.4 79 -99 SPO 1997 10 11 12 57 49 4.0 -9 688.00 -55.0 -51.8 -54.5 79 -99 SPO 1997 10 11 12 58 55 3.8 -9 688.00 -55.0 -52.2 -54.5 79 -99 SPO 1997 10 11 12 59 61 3.5 -9 688.00 -55.4 -52.1 -54.6 82 -99 SPO 1997 10 11 13 00 66 3.3 -9 688.00 -55.7 -52.4 -54.8 82 0 SPO 1997 10 11 13 01 65 3.1 -9 688.00 -56.2 -52.6 -55.2 85 -99 SPO 1997 10 11 13 02 60 3.3 -9 688.00 -56.4 -52.7 -55.4 85 -99 SPO 1997 10 11 13 03 54 3.6 -9 688.00 -56.4 -52.5 -55.5 83 -99 SPO 1997 10 11 13 04 49 4.0 -9 688.00 -56.2 -52.2 -55.5 79 -99 SPO 1997 10 11 13 05 44 4.7 -9 687.90 -56.0 -51.8 -55.4 77 -99 SPO 1997 10 11 13 06 44 4.7 -9 687.90 -55.5 -51.7 -54.9 71 -99 SPO 1997 10 11 13 07 45 5.0 -9 687.90 -55.0 -51.2 -54.5 68 -99 SPO 1997 10 11 13 08 42 5.4 -9 687.90 -54.7 -50.8 -54.3 66 -99 SPO 1997 10 11 13 09 41 5.0 -9 687.90 -54.5 -51.4 -54.4 68 -99 SPO 1997 10 11 13 10 41 5.4 -9 687.90 -54.4 -51.3 -54.2 69 -99 SPO 1997 10 11 13 11 41 5.2 -9 687.90 -54.5 -51.2 -54.4 71 -99 SPO 1997 10 11 13 12 41 5.3 -9 687.90 -54.7 -51.0 -54.4 72 -99 SPO 1997 10 11 13 13 42 4.8 -9 687.90 -54.7 -51.2 -54.4 73 -99 SPO 1997 10 11 13 14 43 4.8 -9 687.90 -54.5 -51.3 -54.3 72 -99 SPO 1997 10 11 13 15 47 4.2 -9 688.00 -54.7 -51.4 -54.4 74 -99 SPO 1997 10 11 13 16 54 3.5 -9 688.00 -54.9 -51.6 -54.5 76 -99 SPO 1997 10 11 13 17 64 2.9 -9 688.10 -55.2 -51.8 -54.6 79 -99 SPO 1997 10 11 13 18 73 2.6 -9 688.10 -55.5 -52.0 -54.9 81 -99 SPO 1997 10 11 13 19 86 2.2 -9 688.10 -55.5 -52.4 -55.1 80 -99 SPO 1997 10 11 13 20 90 2.1 -9 688.10 -55.5 -52.8 -55.0 78 -99 SPO 1997 10 11 13 21 85 1.8 -9 688.10 -55.5 -53.0 -55.0 78 -99 SPO 1997 10 11 13 22 77 2.0 -9 688.10 -55.5 -52.8 -55.0 77 -99 SPO 1997 10 11 13 23 67 2.1 -9 688.20 -55.4 -52.7 -54.8 76 -99 SPO 1997 10 11 13 24 63 2.1 -9 688.10 -55.4 -52.5 -54.7 75 -99 SPO 1997 10 11 13 25 66 2.2 -9 688.20 -55.5 -52.4 -54.7 76 -99 SPO 1997 10 11 13 26 63 2.2 -9 688.20 -55.5 -52.5 -54.7 75 -99 SPO 1997 10 11 13 27 68 2.5 -9 688.20 -55.7 -52.7 -54.8 78 -99 SPO 1997 10 11 13 28 75 2.0 -9 688.20 -56.2 -53.0 -55.4 82 -99 SPO 1997 10 11 13 29 75 2.1 -9 688.20 -56.5 -52.8 -55.6 85 -99 SPO 1997 10 11 13 30 75 2.4 -9 688.10 -56.5 -52.6 -55.6 84 -99 SPO 1997 10 11 13 31 73 2.5 -9 688.20 -56.5 -52.8 -55.7 82 -99 SPO 1997 10 11 13 32 75 2.8 -9 688.10 -56.5 -52.9 -55.6 81 -99 SPO 1997 10 11 13 33 72 3.1 -9 688.10 -56.5 -52.8 -55.5 80 -99 SPO 1997 10 11 13 34 71 3.2 -9 688.10 -56.4 -52.7 -55.4 79 -99 SPO 1997 10 11 13 35 70 3.1 -9 688.10 -56.2 -52.6 -55.4 78 -99 SPO 1997 10 11 13 36 71 3.2 -9 688.10 -56.2 -52.5 -55.3 78 -99 SPO 1997 10 11 13 37 71 3.2 -9 688.20 -56.2 -52.4 -55.3 78 -99 SPO 1997 10 11 13 38 69 3.4 -9 688.20 -56.0 -52.5 -55.2 76 -99 SPO 1997 10 11 13 39 67 3.5 -9 688.20 -56.0 -52.4 -55.0 76 -99 SPO 1997 10 11 13 40 65 3.6 -9 688.10 -55.7 -52.3 -54.9 74 -99 SPO 1997 10 11 13 41 61 3.7 -9 688.10 -55.7 -52.2 -54.8 75 -99 SPO 1997 10 11 13 42 56 3.9 -9 688.10 -55.5 -52.0 -54.8 75 -99 SPO 1997 10 11 13 43 53 4.1 -9 688.20 -55.5 -51.7 -54.8 76 -99 SPO 1997 10 11 13 44 51 4.2 -9 688.10 -55.4 -51.5 -54.8 76 -99 SPO 1997 10 11 13 45 50 4.3 -9 688.10 -55.5 -51.5 -54.9 77 -99 SPO 1997 10 11 13 46 49 4.3 -9 688.20 -55.5 -51.5 -55.1 77 -99 SPO 1997 10 11 13 47 51 4.2 -9 688.10 -55.7 -51.6 -55.2 79 -99 SPO 1997 10 11 13 48 57 3.9 -9 688.10 -56.0 -51.8 -55.4 81 -99 SPO 1997 10 11 13 49 62 3.8 -9 688.10 -56.2 -52.0 -55.5 82 -99 SPO 1997 10 11 13 50 68 3.8 -9 688.20 -56.4 -52.2 -55.6 81 -99 SPO 1997 10 11 13 51 72 4.0 -9 688.20 -56.4 -52.6 -55.6 79 -99 SPO 1997 10 11 13 52 74 4.0 -9 688.20 -56.5 -53.0 -55.6 78 -99 SPO 1997 10 11 13 53 76 3.9 -9 688.20 -56.5 -53.2 -55.6 78 -99 SPO 1997 10 11 13 54 76 4.2 -9 688.10 -56.5 -53.1 -55.7 77 -99 SPO 1997 10 11 13 55 71 4.5 -9 688.10 -56.7 -52.8 -55.8 78 -99 SPO 1997 10 11 13 56 64 4.6 -9 688.10 -56.7 -52.3 -55.7 77 -99 SPO 1997 10 11 13 57 56 4.8 -9 688.10 -56.5 -51.8 -55.6 75 -99 SPO 1997 10 11 13 58 50 5.1 -9 688.10 -56.2 -51.4 -55.4 72 -99 SPO 1997 10 11 13 59 47 5.3 -9 688.00 -55.9 -51.0 -55.2 70 -99 SPO 1997 10 11 14 00 46 5.5 -9 688.00 -55.7 -50.8 -55.1 70 0 SPO 1997 10 11 14 01 46 5.4 -9 688.10 -55.7 -50.8 -55.2 70 -99 SPO 1997 10 11 14 02 47 5.4 -9 688.10 -56.0 -50.9 -55.4 72 -99 SPO 1997 10 11 14 03 49 5.3 -9 688.10 -56.0 -50.9 -55.4 72 -99 SPO 1997 10 11 14 04 50 5.2 -9 688.10 -56.0 -51.1 -55.4 72 -99 SPO 1997 10 11 14 05 52 4.9 -9 688.10 -56.0 -51.2 -55.4 71 -99 SPO 1997 10 11 14 06 57 4.4 -9 688.10 -56.0 -51.4 -55.4 71 -99 SPO 1997 10 11 14 07 64 3.6 -9 688.10 -56.2 -51.8 -55.3 74 -99 SPO 1997 10 11 14 08 70 2.9 -9 688.20 -56.2 -52.2 -55.1 74 -99 SPO 1997 10 11 14 09 76 2.4 -9 688.20 -56.4 -52.6 -55.0 76 -99 SPO 1997 10 11 14 10 83 2.2 -9 688.20 -56.5 -53.0 -55.2 77 -99 SPO 1997 10 11 14 11 91 2.0 -9 688.20 -56.5 -53.7 -55.3 77 -99 SPO 1997 10 11 14 12 88 2.3 -9 688.20 -56.5 -54.2 -55.4 77 -99 SPO 1997 10 11 14 13 83 2.6 -9 688.20 -56.4 -54.1 -55.4 77 -99 SPO 1997 10 11 14 14 78 2.9 -9 688.20 -56.2 -54.0 -55.2 75 -99 SPO 1997 10 11 14 15 71 3.2 -9 688.10 -56.2 -53.6 -55.1 75 -99 SPO 1997 10 11 14 16 67 3.5 -9 688.10 -56.2 -53.2 -55.0 75 -99 SPO 1997 10 11 14 17 64 3.7 -9 688.10 -56.2 -52.8 -55.1 74 -99 SPO 1997 10 11 14 18 63 3.9 -9 688.10 -56.4 -52.5 -55.2 76 -99 SPO 1997 10 11 14 19 62 4.0 -9 688.00 -56.4 -52.3 -55.3 76 -99 SPO 1997 10 11 14 20 63 4.2 -9 688.00 -56.4 -52.1 -55.3 76 -99 SPO 1997 10 11 14 21 61 4.3 -9 688.00 -56.4 -52.3 -55.4 76 -99 SPO 1997 10 11 14 22 59 4.4 -9 688.00 -56.2 -52.3 -55.4 73 -99 SPO 1997 10 11 14 23 58 4.3 -9 688.00 -56.4 -52.0 -55.6 74 -99 SPO 1997 10 11 14 24 57 4.5 -9 688.00 -56.5 -52.2 -55.7 74 -99 SPO 1997 10 11 14 25 55 5.0 -9 688.00 -56.5 -52.1 -55.8 73 -99 SPO 1997 10 11 14 26 52 5.1 -9 688.00 -56.4 -52.0 -55.6 72 -99 SPO 1997 10 11 14 27 50 5.5 -9 688.00 -56.2 -51.6 -55.4 69 -99 SPO 1997 10 11 14 28 50 6.0 -9 688.00 -55.7 -51.0 -55.1 66 -99 SPO 1997 10 11 14 29 48 6.0 -9 688.00 -55.7 -50.7 -55.1 66 -99 SPO 1997 10 11 14 30 46 5.8 -9 688.00 -55.7 -50.6 -55.0 68 -99 SPO 1997 10 11 14 31 46 5.8 -9 688.10 -55.7 -50.3 -55.0 70 -99 SPO 1997 10 11 14 32 47 5.7 -9 688.10 -55.5 -50.1 -54.9 69 -99 SPO 1997 10 11 14 33 50 5.4 -9 688.10 -55.5 -50.1 -54.9 70 -99 SPO 1997 10 11 14 34 52 4.8 -9 688.10 -55.5 -50.4 -54.9 70 -99 SPO 1997 10 11 14 35 56 4.7 -9 688.10 -55.5 -51.1 -54.9 70 -99 SPO 1997 10 11 14 36 59 4.4 -9 688.10 -55.5 -51.6 -54.9 70 -99 SPO 1997 10 11 14 37 62 4.1 -9 688.10 -55.5 -51.9 -54.9 70 -99 SPO 1997 10 11 14 38 62 3.9 -9 688.20 -55.7 -52.3 -54.9 72 -99 SPO 1997 10 11 14 39 62 3.8 -9 688.20 -56.0 -52.2 -54.8 74 -99 SPO 1997 10 11 14 40 62 3.6 -9 688.20 -56.0 -52.2 -54.7 74 -99 SPO 1997 10 11 14 41 63 3.7 -9 688.30 -56.0 -52.0 -54.7 73 -99 SPO 1997 10 11 14 42 62 3.5 -9 688.30 -55.9 -51.9 -54.6 72 -99 SPO 1997 10 11 14 43 60 3.5 -9 688.30 -55.7 -52.0 -54.6 70 -99 SPO 1997 10 11 14 44 58 3.5 -9 688.30 -55.7 -51.9 -54.4 71 -99 SPO 1997 10 11 14 45 59 3.3 -9 688.30 -55.7 -52.1 -54.4 72 -99 SPO 1997 10 11 14 46 62 3.1 -9 688.30 -55.7 -52.3 -54.3 73 -99 SPO 1997 10 11 14 47 69 2.8 -9 688.30 -56.0 -52.6 -54.3 76 -99 SPO 1997 10 11 14 48 76 2.6 -9 688.30 -56.2 -53.0 -54.6 77 -99 SPO 1997 10 11 14 49 80 2.4 -9 688.30 -56.5 -53.4 -55.2 79 -99 SPO 1997 10 11 14 50 83 2.7 -9 688.30 -56.7 -53.6 -55.4 80 -99 SPO 1997 10 11 14 51 80 3.2 -9 688.30 -56.5 -53.7 -55.3 78 -99 SPO 1997 10 11 14 52 76 3.5 -9 688.30 -56.5 -53.6 -55.2 77 -99 SPO 1997 10 11 14 53 69 4.0 -9 688.30 -56.4 -53.2 -55.0 75 -99 SPO 1997 10 11 14 54 64 4.0 -9 688.30 -56.0 -52.8 -54.8 71 -99 SPO 1997 10 11 14 55 61 4.0 -9 688.30 -55.7 -52.5 -54.6 69 -99 SPO 1997 10 11 14 56 59 3.9 -9 688.30 -55.5 -52.3 -54.6 68 -99 SPO 1997 10 11 14 57 53 4.0 -9 688.30 -55.5 -52.1 -54.6 68 -99 SPO 1997 10 11 14 58 50 4.1 -9 688.30 -55.7 -51.8 -54.8 70 -99 SPO 1997 10 11 14 59 49 4.1 -9 688.30 -55.7 -51.6 -54.8 71 -99 SPO 1997 10 11 15 00 48 4.0 -9 688.30 -55.7 -51.5 -54.9 71 0 SPO 1997 10 11 15 01 48 3.9 -9 688.30 -55.9 -51.4 -54.9 73 -99 SPO 1997 10 11 15 02 50 3.6 -9 688.30 -56.0 -51.5 -54.9 74 -99 SPO 1997 10 11 15 03 55 3.3 -9 688.30 -56.2 -51.6 -54.8 76 -99 SPO 1997 10 11 15 04 60 3.1 -9 688.30 -56.5 -51.8 -55.0 77 -99 SPO 1997 10 11 15 05 62 3.1 -9 688.30 -57.0 -52.0 -55.2 81 -99 SPO 1997 10 11 15 06 63 2.8 -9 688.30 -57.0 -52.1 -55.4 78 -99 SPO 1997 10 11 15 07 66 2.8 -9 688.30 -57.0 -52.2 -55.4 77 -99 SPO 1997 10 11 15 08 70 2.6 -9 688.40 -57.0 -52.4 -55.4 76 -99 SPO 1997 10 11 15 09 77 2.5 -9 688.40 -57.0 -52.6 -55.6 76 -99 SPO 1997 10 11 15 10 80 2.6 -9 688.40 -57.0 -52.6 -55.7 76 -99 SPO 1997 10 11 15 11 76 2.6 -9 688.40 -56.7 -52.5 -55.6 72 -99 SPO 1997 10 11 15 12 74 2.6 -9 688.40 -56.5 -52.5 -55.5 71 -99 SPO 1997 10 11 15 13 65 2.9 -9 688.40 -56.5 -52.2 -55.4 72 -99 SPO 1997 10 11 15 14 60 3.1 -9 688.40 -56.5 -51.8 -55.2 73 -99 SPO 1997 10 11 15 15 59 3.1 -9 688.40 -56.5 -51.8 -55.1 73 -99 SPO 1997 10 11 15 16 64 2.8 -9 688.40 -56.7 -51.8 -55.2 76 -99 SPO 1997 10 11 15 17 74 2.4 -9 688.40 -56.9 -52.0 -55.4 76 -99 SPO 1997 10 11 15 18 86 2.2 -9 688.40 -57.0 -52.3 -55.6 77 -99 SPO 1997 10 11 15 19 95 2.2 -9 688.50 -57.2 -52.6 -55.6 77 -99 SPO 1997 10 11 15 20 94 2.4 -9 688.40 -57.2 -53.0 -55.7 76 -99 SPO 1997 10 11 15 21 90 2.6 -9 688.40 -57.0 -52.9 -55.7 74 -99 SPO 1997 10 11 15 22 81 2.8 -9 688.40 -57.0 -52.9 -55.6 75 -99 SPO 1997 10 11 15 23 68 3.0 -9 688.40 -56.7 -52.6 -55.4 73 -99 SPO 1997 10 11 15 24 59 3.5 -9 688.30 -56.5 -52.2 -55.2 72 -99 SPO 1997 10 11 15 25 53 4.0 -9 688.30 -56.4 -51.8 -55.2 71 -99 SPO 1997 10 11 15 26 50 4.3 -9 688.30 -56.4 -51.4 -55.3 72 -99 SPO 1997 10 11 15 27 49 4.4 -9 688.30 -56.2 -51.2 -55.4 70 -99 SPO 1997 10 11 15 28 49 4.5 -9 688.30 -56.4 -51.2 -55.5 72 -99 SPO 1997 10 11 15 29 49 4.5 -9 688.30 -56.5 -51.1 -55.6 73 -99 SPO 1997 10 11 15 30 49 4.5 -9 688.30 -56.7 -51.0 -55.8 75 -99 SPO 1997 10 11 15 31 47 4.7 -9 688.30 -56.7 -50.9 -55.9 74 -99 SPO 1997 10 11 15 32 46 4.7 -9 688.30 -56.7 -50.9 -55.9 73 -99 SPO 1997 10 11 15 33 45 4.9 -9 688.30 -56.7 -50.7 -55.8 71 -99 SPO 1997 10 11 15 34 44 5.1 -9 688.30 -56.7 -50.7 -55.8 71 -99 SPO 1997 10 11 15 35 44 5.2 -9 688.30 -56.5 -50.4 -55.6 69 -99 SPO 1997 10 11 15 36 44 5.3 -9 688.20 -56.2 -50.4 -55.4 67 -99 SPO 1997 10 11 15 37 45 5.3 -9 688.20 -56.2 -50.4 -55.4 69 -99 SPO 1997 10 11 15 38 46 5.4 -9 688.20 -56.0 -50.4 -55.3 68 -99 SPO 1997 10 11 15 39 47 5.3 -9 688.20 -56.0 -50.4 -55.4 69 -99 SPO 1997 10 11 15 40 48 5.0 -9 688.20 -56.2 -50.6 -55.5 71 -99 SPO 1997 10 11 15 41 48 4.8 -9 688.30 -56.4 -50.6 -55.6 73 -99 SPO 1997 10 11 15 42 52 4.2 -9 688.30 -56.5 -50.7 -55.6 75 -99 SPO 1997 10 11 15 43 55 3.5 -9 688.30 -56.5 -50.9 -55.4 74 -99 SPO 1997 10 11 15 44 59 2.8 -9 688.30 -56.7 -51.2 -55.2 75 -99 SPO 1997 10 11 15 45 65 2.2 -9 688.30 -56.9 -51.6 -55.3 76 -99 SPO 1997 10 11 15 46 78 1.6 -9 688.30 -57.2 -52.3 -55.6 77 -99 SPO 1997 10 11 15 47 93 1.4 -9 688.30 -57.4 -53.2 -55.9 79 -99 SPO 1997 10 11 15 48 89 1.6 -9 688.40 -57.4 -53.6 -56.0 79 -99 SPO 1997 10 11 15 49 79 1.8 -9 688.40 -57.2 -53.3 -55.8 76 -99 SPO 1997 10 11 15 50 64 2.3 -9 688.30 -57.0 -52.6 -55.6 75 -99 SPO 1997 10 11 15 51 59 2.7 -9 688.30 -56.7 -52.1 -55.4 73 -99 SPO 1997 10 11 15 52 58 3.1 -9 688.30 -56.5 -51.9 -55.4 71 -99 SPO 1997 10 11 15 53 54 3.4 -9 688.30 -56.5 -51.6 -55.5 72 -99 SPO 1997 10 11 15 54 52 4.0 -9 688.30 -56.4 -51.5 -55.5 71 -99 SPO 1997 10 11 15 55 50 4.1 -9 688.30 -56.4 -51.4 -55.7 72 -99 SPO 1997 10 11 15 56 48 4.2 -9 688.30 -56.4 -51.3 -55.8 72 -99 SPO 1997 10 11 15 57 46 4.2 -9 688.30 -56.5 -51.2 -55.9 72 -99 SPO 1997 10 11 15 58 46 4.2 -9 688.30 -56.7 -51.2 -56.0 73 -99 SPO 1997 10 11 15 59 45 4.4 -9 688.30 -56.7 -51.3 -56.1 73 -99 SPO 1997 10 11 16 00 46 4.3 -9 688.30 -56.9 -51.2 -56.1 75 0 SPO 1997 10 11 16 01 48 4.1 -9 688.40 -56.7 -51.2 -56.0 73 -99 SPO 1997 10 11 16 02 52 3.6 -9 688.40 -56.7 -51.5 -55.8 74 -99 SPO 1997 10 11 16 03 59 2.8 -9 688.40 -56.7 -51.8 -55.8 74 -99 SPO 1997 10 11 16 04 69 2.0 -9 688.40 -56.7 -52.1 -55.9 74 -99 SPO 1997 10 11 16 05 87 1.8 -9 688.40 -56.5 -52.5 -55.8 72 -99 SPO 1997 10 11 16 06 90 2.2 -9 688.40 -56.4 -53.0 -55.6 71 -99 SPO 1997 10 11 16 07 91 2.5 -9 688.40 -56.5 -53.4 -55.7 73 -99 SPO 1997 10 11 16 08 88 2.8 -9 688.40 -56.5 -53.7 -55.7 74 -99 SPO 1997 10 11 16 09 82 3.0 -9 688.40 -56.2 -54.0 -55.5 71 -99 SPO 1997 10 11 16 10 77 3.0 -9 688.40 -56.0 -53.6 -55.3 70 -99 SPO 1997 10 11 16 11 73 3.1 -9 688.40 -55.9 -53.2 -55.2 69 -99 SPO 1997 10 11 16 12 65 3.3 -9 688.40 -55.7 -52.8 -55.0 69 -99 SPO 1997 10 11 16 13 56 3.5 -9 688.40 -55.5 -52.2 -54.9 69 -99 SPO 1997 10 11 16 14 51 3.6 -9 688.40 -55.5 -51.8 -55.0 70 -99 SPO 1997 10 11 16 15 50 3.8 -9 688.40 -55.5 -51.7 -55.1 70 -99 SPO 1997 10 11 16 16 47 4.0 -9 688.40 -55.7 -51.6 -55.3 73 -99 SPO 1997 10 11 16 17 46 4.3 -9 688.40 -55.7 -51.3 -55.4 73 -99 SPO 1997 10 11 16 18 44 4.6 -9 688.40 -55.7 -51.2 -55.4 73 -99 SPO 1997 10 11 16 19 43 4.8 -9 688.30 -55.7 -51.1 -55.2 73 -99 SPO 1997 10 11 16 20 43 4.9 -9 688.30 -55.5 -51.0 -55.2 70 -99 SPO 1997 10 11 16 21 41 4.8 -9 688.30 -55.7 -50.9 -55.2 71 -99 SPO 1997 10 11 16 22 43 4.8 -9 688.30 -55.7 -51.0 -55.2 71 -99 SPO 1997 10 11 16 23 44 5.0 -9 688.30 -55.7 -51.0 -55.2 70 -99 SPO 1997 10 11 16 24 44 5.0 -9 688.30 -55.5 -51.1 -55.0 70 -99 SPO 1997 10 11 16 25 45 5.0 -9 688.30 -55.2 -51.2 -54.8 67 -99 SPO 1997 10 11 16 26 47 4.8 -9 688.30 -54.7 -51.0 -54.4 65 -99 SPO 1997 10 11 16 27 50 4.6 -9 688.30 -54.5 -51.0 -54.3 65 -99 SPO 1997 10 11 16 28 52 4.4 -9 688.30 -54.7 -50.9 -54.3 69 -99 SPO 1997 10 11 16 29 53 4.2 -9 688.30 -54.7 -51.0 -54.4 71 -99 SPO 1997 10 11 16 30 54 3.9 -9 688.30 -54.7 -51.5 -54.4 72 -99 SPO 1997 10 11 16 31 53 3.9 -9 688.30 -55.0 -51.7 -54.4 75 -99 SPO 1997 10 11 16 32 50 4.0 -9 688.30 -55.0 -51.6 -54.3 75 -99 SPO 1997 10 11 16 33 46 4.3 -9 688.30 -54.9 -51.6 -54.3 74 -99 SPO 1997 10 11 16 34 48 4.3 -9 688.30 -54.7 -51.5 -54.2 72 -99 SPO 1997 10 11 16 35 46 4.3 -9 688.30 -54.5 -51.4 -54.0 72 -99 SPO 1997 10 11 16 36 47 4.7 -9 688.30 -54.4 -51.2 -53.8 71 -99 SPO 1997 10 11 16 37 46 5.1 -9 688.30 -54.4 -51.0 -53.8 72 -99 SPO 1997 10 11 16 38 45 5.2 -9 688.30 -54.4 -50.9 -53.8 73 -99 SPO 1997 10 11 16 39 46 5.2 -9 688.30 -54.0 -50.9 -53.5 70 -99 SPO 1997 10 11 16 40 48 5.0 -9 688.30 -54.0 -51.0 -53.4 71 -99 SPO 1997 10 11 16 41 49 5.0 -9 688.30 -54.0 -51.0 -53.4 72 -99 SPO 1997 10 11 16 42 52 4.8 -9 688.30 -53.9 -51.0 -53.3 72 -99 SPO 1997 10 11 16 43 55 4.7 -9 688.30 -54.0 -51.2 -53.4 73 -99 SPO 1997 10 11 16 44 53 4.0 -9 688.30 -54.5 -51.6 -53.8 77 -99 SPO 1997 10 11 16 45 52 4.2 -9 688.30 -54.9 -51.8 -54.2 80 -99 SPO 1997 10 11 16 46 48 4.3 -9 688.30 -55.0 -51.6 -54.2 79 -99 SPO 1997 10 11 16 47 48 4.5 -9 688.30 -54.9 -51.6 -54.1 76 -99 SPO 1997 10 11 16 48 46 4.8 -9 688.20 -54.7 -51.4 -54.0 72 -99 SPO 1997 10 11 16 49 48 4.6 -9 688.20 -54.7 -51.3 -54.0 71 -99 SPO 1997 10 11 16 50 50 4.9 -9 688.20 -54.7 -51.2 -54.0 71 -99 SPO 1997 10 11 16 51 49 5.0 -9 688.20 -55.0 -51.2 -54.2 75 -99 SPO 1997 10 11 16 52 49 5.1 -9 688.20 -55.0 -51.3 -54.2 75 -99 SPO 1997 10 11 16 53 49 5.2 -9 688.20 -55.0 -51.2 -54.2 75 -99 SPO 1997 10 11 16 54 47 5.2 -9 688.20 -54.7 -51.3 -54.0 71 -99 SPO 1997 10 11 16 55 47 5.3 -9 688.20 -54.7 -51.2 -54.2 71 -99 SPO 1997 10 11 16 56 47 5.4 -9 688.20 -55.0 -51.1 -54.3 74 -99 SPO 1997 10 11 16 57 47 5.6 -9 688.20 -55.0 -51.0 -54.3 73 -99 SPO 1997 10 11 16 58 45 5.8 -9 688.20 -54.9 -50.8 -54.2 72 -99 SPO 1997 10 11 16 59 43 5.8 -9 688.20 -54.5 -50.4 -54.0 69 -99 SPO 1997 10 11 17 00 45 6.1 -9 688.20 -54.4 -50.0 -53.8 68 0 SPO 1997 10 11 17 01 44 6.1 -9 688.20 -54.4 -50.0 -53.8 69 -99 SPO 1997 10 11 17 02 42 6.2 -9 688.20 -54.4 -50.0 -53.8 71 -99 SPO 1997 10 11 17 03 42 6.4 -9 688.30 -54.2 -49.9 -53.8 70 -99 SPO 1997 10 11 17 04 41 6.5 -9 688.30 -54.2 -49.9 -53.6 71 -99 SPO 1997 10 11 17 05 43 6.5 -9 688.30 -53.9 -49.5 -53.4 69 -99 SPO 1997 10 11 17 06 41 6.2 -9 688.30 -54.0 -49.6 -53.5 71 -99 SPO 1997 10 11 17 07 43 6.2 -9 688.30 -54.0 -49.8 -53.6 71 -99 SPO 1997 10 11 17 08 43 5.8 -9 688.30 -54.0 -50.2 -53.6 71 -99 SPO 1997 10 11 17 09 46 5.7 -9 688.30 -54.0 -50.4 -53.6 71 -99 SPO 1997 10 11 17 10 48 5.5 -9 688.30 -54.2 -50.5 -53.6 72 -99 SPO 1997 10 11 17 11 48 5.1 -9 688.30 -54.2 -50.7 -53.6 72 -99 SPO 1997 10 11 17 12 50 4.7 -9 688.30 -54.2 -50.8 -53.6 72 -99 SPO 1997 10 11 17 13 52 4.4 -9 688.40 -54.0 -51.0 -53.4 72 -99 SPO 1997 10 11 17 14 55 4.0 -9 688.40 -54.0 -51.1 -53.4 72 -99 SPO 1997 10 11 17 15 55 3.7 -9 688.40 -54.2 -51.3 -53.4 74 -99 SPO 1997 10 11 17 16 56 3.5 -9 688.40 -54.4 -51.5 -53.6 77 -99 SPO 1997 10 11 17 17 59 3.6 -9 688.50 -54.7 -51.6 -53.8 80 -99 SPO 1997 10 11 17 18 57 3.4 -9 688.50 -54.9 -51.8 -53.8 81 -99 SPO 1997 10 11 17 19 58 3.5 -9 688.40 -55.0 -51.8 -54.0 81 -99 SPO 1997 10 11 17 20 55 3.8 -9 688.40 -55.2 -51.6 -54.2 81 -99 SPO 1997 10 11 17 21 51 4.3 -9 688.40 -55.4 -51.3 -54.5 82 -99 SPO 1997 10 11 17 22 48 4.6 -9 688.40 -55.5 -51.2 -54.7 81 -99 SPO 1997 10 11 17 23 45 4.8 -9 688.40 -55.5 -51.1 -54.8 79 -99 SPO 1997 10 11 17 24 44 5.2 -9 688.40 -55.5 -50.8 -54.8 78 -99 SPO 1997 10 11 17 25 41 5.3 -9 688.40 -55.2 -50.7 -54.7 73 -99 SPO 1997 10 11 17 26 40 5.5 -9 688.30 -55.0 -50.5 -54.5 71 -99 SPO 1997 10 11 17 27 39 5.7 -9 688.30 -54.7 -50.4 -54.2 70 -99 SPO 1997 10 11 17 28 39 5.8 -9 688.30 -54.5 -50.1 -54.0 69 -99 SPO 1997 10 11 17 29 39 5.8 -9 688.30 -54.2 -50.0 -53.9 67 -99 SPO 1997 10 11 17 30 39 5.9 -9 688.30 -54.2 -50.0 -53.8 68 -99 SPO 1997 10 11 17 31 38 5.7 -9 688.30 -54.0 -50.0 -53.7 68 -99 SPO 1997 10 11 17 32 38 5.6 -9 688.30 -54.0 -50.0 -53.6 70 -99 SPO 1997 10 11 17 33 40 5.5 -9 688.30 -53.7 -50.0 -53.6 68 -99 SPO 1997 10 11 17 34 41 6.1 -9 688.30 -53.7 -49.9 -53.5 69 -99 SPO 1997 10 11 17 35 40 5.7 -9 688.30 -53.5 -49.7 -53.3 69 -99 SPO 1997 10 11 17 36 40 5.8 -9 688.30 -53.4 -49.8 -53.3 69 -99 SPO 1997 10 11 17 37 39 6.0 -9 688.30 -53.4 -49.8 -53.2 70 -99 SPO 1997 10 11 17 38 38 6.1 -9 688.30 -53.4 -49.8 -53.2 71 -99 SPO 1997 10 11 17 39 38 6.3 -9 688.30 -53.2 -49.5 -53.1 71 -99 SPO 1997 10 11 17 40 37 6.6 -9 688.30 -53.2 -49.2 -53.0 72 -99 SPO 1997 10 11 17 41 36 6.7 -9 688.30 -53.0 -49.1 -53.0 71 -99 SPO 1997 10 11 17 42 35 6.7 -9 688.30 -53.0 -49.0 -52.8 71 -99 SPO 1997 10 11 17 43 35 6.8 -9 688.30 -52.7 -49.0 -52.6 69 -99 SPO 1997 10 11 17 44 35 6.3 -9 688.30 -52.7 -49.1 -52.4 71 -99 SPO 1997 10 11 17 45 35 6.3 -9 688.30 -52.7 -49.4 -52.4 72 -99 SPO 1997 10 11 17 46 37 6.1 -9 688.30 -52.7 -49.5 -52.4 73 -99 SPO 1997 10 11 17 47 38 6.0 -9 688.30 -52.7 -49.4 -52.4 73 -99 SPO 1997 10 11 17 48 36 5.6 -9 688.30 -52.7 -49.5 -52.4 74 -99 SPO 1997 10 11 17 49 32 4.7 -9 688.30 -52.7 -50.4 -52.4 74 -99 SPO 1997 10 11 17 50 38 5.0 -9 688.30 -52.7 -50.6 -52.4 75 -99 SPO 1997 10 11 17 51 41 5.6 -9 688.30 -52.7 -50.1 -52.4 75 -99 SPO 1997 10 11 17 52 42 5.5 -9 688.30 -52.7 -50.0 -52.3 75 -99 SPO 1997 10 11 17 53 41 5.5 -9 688.30 -52.7 -50.1 -52.4 75 -99 SPO 1997 10 11 17 54 42 5.4 -9 688.30 -52.7 -50.0 -52.4 75 -99 SPO 1997 10 11 17 55 42 5.3 -9 688.30 -52.7 -50.1 -52.5 75 -99 SPO 1997 10 11 17 56 43 5.1 -9 688.30 -52.9 -50.1 -52.4 77 -99 SPO 1997 10 11 17 57 44 5.1 -9 688.30 -52.7 -50.1 -52.4 75 -99 SPO 1997 10 11 17 58 45 4.8 -9 688.30 -52.7 -50.2 -52.4 74 -99 SPO 1997 10 11 17 59 44 4.6 -9 688.30 -52.7 -50.3 -52.4 73 -99 SPO 1997 10 11 18 00 43 4.5 -9 688.30 -52.7 -50.4 -52.4 73 0 SPO 1997 10 11 18 01 43 4.3 -9 688.30 -52.7 -50.5 -52.3 74 -99 SPO 1997 10 11 18 02 42 4.4 -9 688.30 -52.7 -50.5 -52.2 75 -99 SPO 1997 10 11 18 03 43 4.6 -9 688.30 -52.7 -50.5 -52.2 75 -99 SPO 1997 10 11 18 04 44 4.8 -9 688.30 -52.7 -50.3 -52.2 77 -99 SPO 1997 10 11 18 05 45 4.9 -9 688.30 -52.7 -50.2 -52.2 77 -99 SPO 1997 10 11 18 06 45 4.9 -9 688.30 -52.7 -50.2 -52.2 77 -99 SPO 1997 10 11 18 07 44 4.9 -9 688.30 -52.5 -50.3 -52.1 76 -99 SPO 1997 10 11 18 08 42 4.9 -9 688.30 -52.7 -50.4 -52.2 78 -99 SPO 1997 10 11 18 09 41 4.8 -9 688.30 -52.7 -50.3 -52.2 77 -99 SPO 1997 10 11 18 10 40 4.7 -9 688.30 -52.9 -50.3 -52.3 79 -99 SPO 1997 10 11 18 11 41 4.5 -9 688.40 -53.0 -50.4 -52.4 78 -99 SPO 1997 10 11 18 12 42 4.5 -9 688.40 -53.0 -50.5 -52.4 77 -99 SPO 1997 10 11 18 13 44 4.5 -9 688.40 -53.0 -50.4 -52.4 76 -99 SPO 1997 10 11 18 14 44 4.4 -9 688.40 -53.0 -50.5 -52.5 76 -99 SPO 1997 10 11 18 15 44 4.5 -9 688.40 -53.0 -50.4 -52.5 75 -99 SPO 1997 10 11 18 16 47 4.3 -9 688.40 -53.2 -50.4 -52.5 77 -99 SPO 1997 10 11 18 17 49 3.9 -9 688.40 -53.2 -50.6 -52.5 77 -99 SPO 1997 10 11 18 18 50 3.8 -9 688.40 -53.4 -50.9 -52.6 79 -99 SPO 1997 10 11 18 19 52 3.9 -9 688.40 -53.5 -50.8 -52.7 79 -99 SPO 1997 10 11 18 20 53 4.2 -9 688.40 -53.5 -50.7 -52.8 79 -99 SPO 1997 10 11 18 21 52 4.3 -9 688.40 -53.5 -50.7 -52.8 79 -99 SPO 1997 10 11 18 22 53 4.3 -9 688.40 -53.7 -50.6 -52.9 80 -99 SPO 1997 10 11 18 23 51 4.5 -9 688.30 -53.7 -50.8 -52.9 79 -99 SPO 1997 10 11 18 24 51 4.4 -9 688.30 -53.7 -50.7 -53.0 78 -99 SPO 1997 10 11 18 25 51 4.7 -9 688.30 -53.7 -50.9 -53.1 77 -99 SPO 1997 10 11 18 26 49 4.8 -9 688.30 -53.7 -50.8 -53.2 77 -99 SPO 1997 10 11 18 27 47 4.9 -9 688.30 -53.7 -50.6 -53.2 77 -99 SPO 1997 10 11 18 28 45 5.2 -9 688.30 -53.7 -50.6 -53.1 76 -99 SPO 1997 10 11 18 29 46 5.2 -9 688.30 -53.5 -50.4 -52.8 74 -99 SPO 1997 10 11 18 30 47 5.0 -9 688.30 -53.4 -50.2 -52.8 73 -99 SPO 1997 10 11 18 31 47 4.6 -9 688.40 -53.2 -50.4 -52.8 73 -99 SPO 1997 10 11 18 32 49 4.5 -9 688.40 -53.2 -50.6 -52.8 73 -99 SPO 1997 10 11 18 33 51 4.4 -9 688.40 -53.2 -50.8 -52.8 73 -99 SPO 1997 10 11 18 34 51 4.3 -9 688.40 -53.4 -50.9 -52.9 74 -99 SPO 1997 10 11 18 35 52 4.2 -9 688.40 -53.5 -51.1 -52.9 75 -99 SPO 1997 10 11 18 36 52 4.2 -9 688.40 -53.5 -51.1 -52.9 75 -99 SPO 1997 10 11 18 37 53 4.0 -9 688.40 -53.5 -51.1 -53.0 75 -99 SPO 1997 10 11 18 38 54 4.0 -9 688.40 -53.7 -51.2 -53.1 77 -99 SPO 1997 10 11 18 39 56 3.8 -9 688.40 -53.7 -51.2 -53.1 77 -99 SPO 1997 10 11 18 40 59 3.6 -9 688.50 -54.0 -51.2 -53.2 79 -99 SPO 1997 10 11 18 41 60 3.5 -9 688.50 -54.2 -51.2 -53.2 81 -99 SPO 1997 10 11 18 42 61 3.5 -9 688.50 -54.2 -51.5 -53.3 80 -99 SPO 1997 10 11 18 43 62 3.4 -9 688.50 -54.4 -51.4 -53.4 81 -99 SPO 1997 10 11 18 44 59 3.4 -9 688.50 -54.5 -51.3 -53.4 81 -99 SPO 1997 10 11 18 45 60 3.5 -9 688.50 -54.5 -51.4 -53.6 80 -99 SPO 1997 10 11 18 46 60 3.6 -9 688.50 -54.5 -51.5 -53.7 79 -99 SPO 1997 10 11 18 47 59 3.8 -9 688.40 -54.7 -51.4 -53.8 79 -99 SPO 1997 10 11 18 48 57 4.0 -9 688.40 -54.7 -51.6 -54.0 78 -99 SPO 1997 10 11 18 49 54 4.2 -9 688.40 -54.7 -51.6 -54.1 76 -99 SPO 1997 10 11 18 50 52 4.5 -9 688.40 -54.7 -51.2 -54.2 75 -99 SPO 1997 10 11 18 51 50 4.7 -9 688.40 -54.7 -50.9 -54.1 74 -99 SPO 1997 10 11 18 52 48 4.8 -9 688.30 -54.7 -50.8 -54.1 73 -99 SPO 1997 10 11 18 53 46 5.1 -9 688.30 -54.5 -50.7 -54.0 72 -99 SPO 1997 10 11 18 54 44 5.3 -9 688.30 -54.5 -50.7 -54.0 72 -99 SPO 1997 10 11 18 55 44 5.2 -9 688.30 -54.4 -50.8 -54.0 72 -99 SPO 1997 10 11 18 56 42 5.4 -9 688.30 -54.2 -50.5 -53.8 70 -99 SPO 1997 10 11 18 57 42 5.3 -9 688.30 -54.2 -50.4 -53.8 70 -99 SPO 1997 10 11 18 58 42 5.3 -9 688.30 -54.2 -50.6 -53.9 71 -99 SPO 1997 10 11 18 59 42 5.4 -9 688.30 -54.2 -50.5 -53.9 71 -99 SPO 1997 10 11 19 00 41 5.5 -9 688.30 -54.4 -50.3 -54.0 72 0 SPO 1997 10 11 19 01 40 5.7 -9 688.30 -54.4 -50.1 -54.0 72 -99 SPO 1997 10 11 19 02 39 5.8 -9 688.30 -54.2 -50.0 -53.9 70 -99 SPO 1997 10 11 19 03 38 5.9 -9 688.30 -54.2 -49.8 -53.8 69 -99 SPO 1997 10 11 19 04 38 6.2 -9 688.30 -54.0 -49.6 -53.6 68 -99 SPO 1997 10 11 19 05 37 6.3 -9 688.20 -54.0 -49.5 -53.6 69 -99 SPO 1997 10 11 19 06 36 6.4 -9 688.20 -54.0 -49.6 -53.5 70 -99 SPO 1997 10 11 19 07 36 6.7 -9 688.20 -53.7 -49.1 -53.4 69 -99 SPO 1997 10 11 19 08 36 7.0 -9 688.20 -53.7 -48.6 -53.4 70 -99 SPO 1997 10 11 19 09 35 7.1 -9 688.10 -53.7 -48.1 -53.3 71 -99 SPO 1997 10 11 19 10 35 7.0 -9 688.10 -53.7 -48.2 -53.3 72 -99 SPO 1997 10 11 19 11 35 6.8 -9 688.10 -53.5 -48.4 -53.2 71 -99 SPO 1997 10 11 19 12 35 6.8 -9 688.20 -53.5 -48.8 -53.2 71 -99 SPO 1997 10 11 19 13 35 6.6 -9 688.20 -53.4 -48.6 -53.0 71 -99 SPO 1997 10 11 19 14 36 6.6 -9 688.20 -53.4 -48.5 -53.0 71 -99 SPO 1997 10 11 19 15 36 6.5 -9 688.20 -53.4 -48.4 -53.0 72 -99 SPO 1997 10 11 19 16 36 6.4 -9 688.20 -53.4 -48.4 -52.9 73 -99 SPO 1997 10 11 19 17 37 6.3 -9 688.30 -53.4 -48.5 -52.9 73 -99 SPO 1997 10 11 19 18 37 6.1 -9 688.30 -53.2 -48.6 -52.8 72 -99 SPO 1997 10 11 19 19 38 5.8 -9 688.30 -53.2 -49.0 -52.8 73 -99 SPO 1997 10 11 19 20 40 5.8 -9 688.30 -53.2 -49.2 -52.7 74 -99 SPO 1997 10 11 19 21 42 5.5 -9 688.30 -53.0 -49.4 -52.6 72 -99 SPO 1997 10 11 19 22 43 5.3 -9 688.30 -53.0 -49.6 -52.6 73 -99 SPO 1997 10 11 19 23 46 5.0 -9 688.30 -53.2 -49.9 -52.6 75 -99 SPO 1997 10 11 19 24 48 4.8 -9 688.40 -53.2 -50.3 -52.8 75 -99 SPO 1997 10 11 19 25 51 4.6 -9 688.40 -53.4 -50.5 -52.8 76 -99 SPO 1997 10 11 19 26 51 4.6 -9 688.40 -53.5 -50.6 -53.0 77 -99 SPO 1997 10 11 19 27 51 4.6 -9 688.40 -53.7 -50.7 -53.1 79 -99 SPO 1997 10 11 19 28 51 4.5 -9 688.40 -54.0 -50.7 -53.2 81 -99 SPO 1997 10 11 19 29 50 4.8 -9 688.30 -54.0 -50.6 -53.2 81 -99 SPO 1997 10 11 19 30 48 5.0 -9 688.30 -54.0 -50.4 -53.3 80 -99 SPO 1997 10 11 19 31 47 5.2 -9 688.30 -54.0 -50.3 -53.3 79 -99 SPO 1997 10 11 19 32 46 5.5 -9 688.30 -54.0 -50.4 -53.2 78 -99 SPO 1997 10 11 19 33 45 5.6 -9 688.30 -54.0 -50.3 -53.3 78 -99 SPO 1997 10 11 19 34 46 5.7 -9 688.30 -54.0 -50.1 -53.3 77 -99 SPO 1997 10 11 19 35 46 5.8 -9 688.30 -54.0 -50.0 -53.3 77 -99 SPO 1997 10 11 19 36 45 6.0 -9 688.30 -54.0 -49.8 -53.3 76 -99 SPO 1997 10 11 19 37 43 6.2 -9 688.30 -53.9 -49.4 -53.3 74 -99 SPO 1997 10 11 19 38 42 6.3 -9 688.30 -54.0 -49.0 -53.2 74 -99 SPO 1997 10 11 19 39 41 6.3 -9 688.20 -53.9 -49.0 -53.2 73 -99 SPO 1997 10 11 19 40 41 6.3 -9 688.30 -53.7 -48.8 -53.1 71 -99 SPO 1997 10 11 19 41 41 6.2 -9 688.30 -53.7 -48.7 -53.1 71 -99 SPO 1997 10 11 19 42 40 5.9 -9 688.30 -53.7 -48.8 -53.1 72 -99 SPO 1997 10 11 19 43 40 6.0 -9 688.30 -53.7 -48.6 -53.1 72 -99 SPO 1997 10 11 19 44 39 6.1 -9 688.30 -53.7 -48.9 -53.1 72 -99 SPO 1997 10 11 19 45 39 6.0 -9 688.30 -53.5 -49.2 -52.9 71 -99 SPO 1997 10 11 19 46 39 6.0 -9 688.30 -53.5 -49.2 -52.9 71 -99 SPO 1997 10 11 19 47 41 5.9 -9 688.30 -53.5 -49.1 -52.9 73 -99 SPO 1997 10 11 19 48 43 5.7 -9 688.30 -53.5 -49.0 -52.9 73 -99 SPO 1997 10 11 19 49 43 5.5 -9 688.40 -53.5 -49.0 -53.0 73 -99 SPO 1997 10 11 19 50 44 5.3 -9 688.40 -53.7 -49.1 -53.1 74 -99 SPO 1997 10 11 19 51 45 5.0 -9 688.40 -53.7 -49.4 -53.0 74 -99 SPO 1997 10 11 19 52 46 4.8 -9 688.40 -53.7 -49.5 -53.0 74 -99 SPO 1997 10 11 19 53 48 4.5 -9 688.50 -53.9 -49.6 -53.1 77 -99 SPO 1997 10 11 19 54 50 4.2 -9 688.50 -54.0 -49.9 -53.1 79 -99 SPO 1997 10 11 19 55 54 3.9 -9 688.50 -54.0 -50.3 -53.1 79 -99 SPO 1997 10 11 19 56 60 3.4 -9 688.60 -54.0 -50.9 -53.0 79 -99 SPO 1997 10 11 19 57 69 2.9 -9 688.60 -53.9 -51.3 -53.0 79 -99 SPO 1997 10 11 19 58 81 2.5 -9 688.60 -54.4 -51.9 -53.5 -99 -99 SPO 1997 10 11 19 59 91 2.2 -9 688.60 -55.0 -52.4 -54.2 -99 -99 SPO 1997 10 11 20 00 90 2.3 -9 688.60 -55.3 -52.6 -54.6 -99 0 SPO 1997 10 11 20 01 78 2.8 -9 688.60 -55.4 -52.6 -54.8 -99 -99 SPO 1997 10 11 20 02 69 3.2 -9 688.60 -55.2 -52.1 -54.5 -99 -99 SPO 1997 10 11 20 03 59 3.7 -9 688.60 -54.9 -51.6 -54.0 -99 -99 SPO 1997 10 11 20 04 52 4.0 -9 688.60 -54.7 -50.8 -53.8 -99 -99 SPO 1997 10 11 20 05 48 4.4 -9 688.60 -54.5 -50.2 -53.9 -99 -99 SPO 1997 10 11 20 06 45 4.8 -9 688.60 -54.4 -49.8 -53.9 -99 -99 SPO 1997 10 11 20 07 42 5.2 -9 688.60 -54.4 -49.4 -54.0 -99 -99 SPO 1997 10 11 20 08 40 5.4 -9 688.60 -54.5 -49.1 -54.1 -99 -99 SPO 1997 10 11 20 09 39 5.5 -9 688.60 -54.5 -49.0 -54.1 -99 -99 SPO 1997 10 11 20 10 39 5.4 -9 688.60 -54.6 -48.9 -54.2 -99 -99 SPO 1997 10 11 20 11 39 5.2 -9 688.60 -54.7 -48.9 -54.4 -99 -99 SPO 1997 10 11 20 12 39 5.2 -9 688.60 -54.8 -49.0 -54.4 -99 -99 SPO 1997 10 11 20 13 41 5.0 -9 688.60 -54.7 -49.1 -54.4 -99 -99 SPO 1997 10 11 20 14 43 4.9 -9 688.60 -54.5 -49.0 -54.2 -99 -99 SPO 1997 10 11 20 15 47 4.5 -9 688.60 -54.4 -49.4 -54.1 -99 -99 SPO 1997 10 11 20 16 52 4.2 -9 688.60 -54.4 -49.6 -54.1 -99 -99 SPO 1997 10 11 20 17 55 4.0 -9 688.60 -54.5 -50.0 -54.2 -99 -99 SPO 1997 10 11 20 18 58 3.8 -9 688.60 -54.8 -50.4 -54.2 -99 -99 SPO 1997 10 11 20 19 62 3.8 -9 688.60 -55.0 -50.3 -54.2 -99 -99 SPO 1997 10 11 20 20 67 3.5 -9 688.60 -55.2 -50.6 -54.4 -99 -99 SPO 1997 10 11 20 21 72 3.4 -9 688.60 -55.7 -50.8 -54.9 -99 -99 SPO 1997 10 11 20 22 73 3.1 -9 688.60 -56.3 -51.0 -55.8 -99 -99 SPO 1997 10 11 20 23 73 3.0 -9 688.60 -56.5 -51.2 -56.0 -99 -99 SPO 1997 10 11 20 24 71 3.3 -9 688.60 -56.2 -51.0 -55.7 -99 -99 SPO 1997 10 11 20 25 72 3.5 -9 688.60 -56.0 -50.5 -55.4 -99 -99 SPO 1997 10 11 20 26 75 3.7 -9 688.60 -55.8 -50.3 -55.4 -99 -99 SPO 1997 10 11 20 27 81 3.8 -9 688.60 -56.0 -51.1 -55.6 -99 -99 SPO 1997 10 11 20 28 89 3.5 -9 688.60 -56.6 -52.0 -56.3 -99 -99 SPO 1997 10 11 20 29 88 3.7 -9 688.60 -56.9 -52.3 -56.7 -99 -99 SPO 1997 10 11 20 30 80 3.9 -9 688.60 -56.9 -52.3 -56.6 -99 -99 SPO 1997 10 11 20 31 72 4.0 -9 688.60 -56.6 -51.8 -56.2 -99 -99 SPO 1997 10 11 20 32 64 4.2 -9 688.60 -56.2 -51.0 -55.8 -99 -99 SPO 1997 10 11 20 33 61 4.3 -9 688.60 -56.5 -50.6 -55.4 -99 -99 SPO 1997 10 11 20 34 60 4.4 -9 688.60 -56.5 -50.6 -55.4 -99 -99 SPO 1997 10 11 20 35 62 4.3 -9 688.60 -56.5 -50.6 -55.4 -99 -99 SPO 1997 10 11 20 36 60 4.3 -9 688.60 -56.5 -50.9 -55.5 -99 -99 SPO 1997 10 11 20 37 63 4.0 -9 688.60 -56.5 -51.0 -55.5 -99 -99 SPO 1997 10 11 20 38 66 4.1 -9 688.60 -56.5 -51.0 -55.6 -99 -99 SPO 1997 10 11 20 39 65 4.1 -9 688.60 -56.7 -51.2 -55.6 -99 -99 SPO 1997 10 11 20 40 63 4.1 -9 688.60 -56.7 -51.2 -55.6 -99 -99 SPO 1997 10 11 20 41 63 4.1 -9 688.60 -56.7 -51.2 -55.7 -99 -99 SPO 1997 10 11 20 42 63 3.9 -9 688.60 -56.7 -51.2 -55.6 -99 -99 SPO 1997 10 11 20 43 63 4.0 -9 688.60 -56.7 -51.3 -55.7 -99 -99 SPO 1997 10 11 20 44 60 4.1 -9 688.60 -56.7 -51.2 -55.7 -99 -99 SPO 1997 10 11 20 45 59 4.0 -9 688.60 -56.7 -50.9 -55.7 -99 -99 SPO 1997 10 11 20 46 57 4.2 -9 688.60 -56.5 -50.8 -55.8 -99 -99 SPO 1997 10 11 20 47 55 4.4 -9 688.60 -56.5 -50.8 -55.8 -99 -99 SPO 1997 10 11 20 48 54 4.5 -9 688.60 -56.7 -50.6 -55.9 -99 -99 SPO 1997 10 11 20 49 52 4.7 -9 688.60 -56.5 -50.3 -55.9 -99 -99 SPO 1997 10 11 20 50 51 5.0 -9 688.60 -56.5 -50.0 -55.9 -99 -99 SPO 1997 10 11 20 51 50 5.1 -9 688.60 -56.4 -49.5 -55.8 -99 -99 SPO 1997 10 11 20 52 48 5.1 -9 688.60 -56.2 -49.2 -55.7 -99 -99 SPO 1997 10 11 20 53 47 5.1 -9 688.60 -56.2 -49.1 -55.7 -99 -99 SPO 1997 10 11 20 54 49 5.0 -9 688.60 -56.2 -49.0 -55.7 -99 -99 SPO 1997 10 11 20 55 51 5.0 -9 688.60 -56.4 -48.9 -55.8 -99 -99 SPO 1997 10 11 20 56 50 4.9 -9 688.60 -56.5 -49.2 -55.9 -99 -99 SPO 1997 10 11 20 57 51 4.7 -9 688.60 -56.5 -49.4 -55.9 -99 -99 SPO 1997 10 11 20 58 53 4.6 -9 688.60 -56.7 -49.6 -56.0 -99 -99 SPO 1997 10 11 20 59 56 4.4 -9 688.60 -56.7 -50.0 -56.0 -99 -99 SPO 1997 10 11 21 00 58 4.2 -9 688.60 -56.9 -50.4 -56.0 -99 0 SPO 1997 10 11 21 01 59 4.2 -9 688.60 -56.9 -50.3 -56.0 -99 -99 SPO 1997 10 11 21 02 60 4.1 -9 688.60 -57.0 -50.2 -56.0 83 -99 SPO 1997 10 11 21 03 59 4.1 -9 688.60 -57.0 -50.3 -55.9 83 -99 SPO 1997 10 11 21 04 60 4.0 -9 688.60 -57.0 -50.6 -55.9 82 -99 SPO 1997 10 11 21 05 60 4.0 -9 688.60 -57.0 -50.7 -55.9 82 -99 SPO 1997 10 11 21 06 60 3.9 -9 688.60 -56.7 -50.8 -55.8 80 -99 SPO 1997 10 11 21 07 66 3.7 -9 688.60 -56.7 -50.9 -55.7 80 -99 SPO 1997 10 11 21 08 69 4.0 -9 688.60 -56.7 -50.9 -55.7 81 -99 SPO 1997 10 11 21 09 65 4.4 -9 688.60 -56.5 -50.4 -55.7 79 -99 SPO 1997 10 11 21 10 59 4.9 -9 688.60 -56.5 -49.6 -55.7 80 -99 SPO 1997 10 11 21 11 53 5.3 -9 688.60 -56.5 -49.0 -55.7 81 -99 SPO 1997 10 11 21 12 50 5.7 -9 688.60 -56.4 -48.5 -55.7 81 -99 SPO 1997 10 11 21 13 50 5.6 -9 688.60 -56.2 -48.5 -55.8 79 -99 SPO 1997 10 11 21 14 49 5.8 -9 688.60 -56.4 -48.4 -55.8 80 -99 SPO 1997 10 11 21 15 48 5.8 -9 688.60 -56.4 -48.2 -55.8 79 -99 SPO 1997 10 11 21 16 49 6.0 -9 688.60 -56.4 -48.0 -55.9 79 -99 SPO 1997 10 11 21 17 49 6.0 -9 688.60 -56.4 -47.6 -55.9 79 -99 SPO 1997 10 11 21 18 50 6.0 -9 688.60 -56.5 -47.7 -56.0 80 -99 SPO 1997 10 11 21 19 50 5.9 -9 688.60 -56.5 -47.8 -56.1 80 -99 SPO 1997 10 11 21 20 51 5.9 -9 688.60 -56.5 -48.0 -56.1 80 -99 SPO 1997 10 11 21 21 49 5.8 -9 688.60 -56.5 -48.0 -56.0 80 -99 SPO 1997 10 11 21 22 49 5.7 -9 688.50 -56.5 -48.3 -56.0 79 -99 SPO 1997 10 11 21 23 52 5.6 -9 688.50 -56.5 -48.5 -56.0 79 -99 SPO 1997 10 11 21 24 54 5.6 -9 688.60 -56.5 -48.3 -56.0 79 -99 SPO 1997 10 11 21 25 54 5.7 -9 688.60 -56.5 -48.1 -56.1 79 -99 SPO 1997 10 11 21 26 54 5.7 -9 688.60 -56.5 -48.1 -56.2 78 -99 SPO 1997 10 11 21 27 54 5.6 -9 688.60 -56.7 -48.2 -56.2 80 -99 SPO 1997 10 11 21 28 54 5.6 -9 688.60 -56.5 -48.0 -56.1 77 -99 SPO 1997 10 11 21 29 52 5.4 -9 688.60 -56.4 -48.1 -56.0 78 -99 SPO 1997 10 11 21 30 52 5.6 -9 688.60 -56.2 -47.8 -55.8 76 -99 SPO 1997 10 11 21 31 54 5.6 -9 688.60 -56.2 -47.3 -55.9 77 -99 SPO 1997 10 11 21 32 54 4.7 -9 688.60 -56.4 -47.6 -56.0 79 -99 SPO 1997 10 11 21 33 56 4.5 -9 688.60 -56.4 -48.1 -56.0 80 -99 SPO 1997 10 11 21 34 59 4.9 -9 688.60 -56.4 -48.2 -56.0 80 -99 SPO 1997 10 11 21 35 59 5.1 -9 688.60 -56.4 -48.0 -56.0 81 -99 SPO 1997 10 11 21 36 60 4.8 -9 688.60 -56.5 -47.8 -56.0 82 -99 SPO 1997 10 11 21 37 62 4.8 -9 688.60 -56.5 -48.2 -56.1 82 -99 SPO 1997 10 11 21 38 62 4.7 -9 688.60 -56.5 -48.0 -56.1 82 -99 SPO 1997 10 11 21 39 62 4.8 -9 688.60 -56.5 -48.1 -56.1 82 -99 SPO 1997 10 11 21 40 63 4.6 -9 688.60 -56.5 -48.2 -56.0 81 -99 SPO 1997 10 11 21 41 63 4.5 -9 688.60 -56.5 -48.6 -56.0 81 -99 SPO 1997 10 11 21 42 64 4.8 -9 688.60 -56.5 -48.5 -55.9 81 -99 SPO 1997 10 11 21 43 64 4.5 -9 688.60 -56.5 -48.5 -55.9 81 -99 SPO 1997 10 11 21 44 64 4.4 -9 688.60 -56.7 -48.8 -55.9 83 -99 SPO 1997 10 11 21 45 65 4.9 -9 688.60 -56.5 -48.6 -55.9 81 -99 SPO 1997 10 11 21 46 65 4.8 -9 688.60 -56.5 -48.6 -55.9 82 -99 SPO 1997 10 11 21 47 66 4.7 -9 688.60 -56.7 -48.7 -56.0 84 -99 SPO 1997 10 11 21 48 64 5.0 -9 688.60 -56.7 -48.9 -56.2 84 -99 SPO 1997 10 11 21 49 64 5.3 -9 688.50 -56.7 -48.6 -56.3 83 -99 SPO 1997 10 11 21 50 62 5.6 -9 688.50 -56.7 -48.1 -56.3 83 -99 SPO 1997 10 11 21 51 60 5.7 -9 688.50 -56.7 -47.4 -56.3 82 -99 SPO 1997 10 11 21 52 61 5.7 -9 688.50 -56.7 -47.7 -56.3 81 -99 SPO 1997 10 11 21 53 61 6.0 -9 688.50 -56.5 -47.1 -56.3 78 -99 SPO 1997 10 11 21 54 60 5.7 -9 688.50 -56.5 -47.5 -56.3 79 -99 SPO 1997 10 11 21 55 61 5.8 -9 688.50 -56.5 -47.5 -56.2 79 -99 SPO 1997 10 11 21 56 61 5.8 -9 688.50 -56.5 -47.6 -56.1 79 -99 SPO 1997 10 11 21 57 60 5.8 -9 688.50 -56.5 -47.2 -55.9 79 -99 SPO 1997 10 11 21 58 60 5.7 -9 688.50 -56.4 -47.2 -55.8 79 -99 SPO 1997 10 11 21 59 60 5.6 -9 688.50 -56.2 -47.7 -55.8 78 -99 SPO 1997 10 11 22 00 61 5.7 -9 688.50 -56.2 -47.6 -55.7 78 0 SPO 1997 10 11 22 01 62 5.5 -9 688.50 -56.2 -47.8 -55.7 78 -99 SPO 1997 10 11 22 02 62 5.5 -9 688.50 -56.2 -48.2 -55.7 78 -99 SPO 1997 10 11 22 03 62 5.7 -9 688.50 -56.2 -48.1 -55.6 78 -99 SPO 1997 10 11 22 04 63 5.8 -9 688.50 -56.2 -47.8 -55.6 78 -99 SPO 1997 10 11 22 05 63 5.7 -9 688.50 -56.2 -47.7 -55.5 78 -99 SPO 1997 10 11 22 06 63 5.5 -9 688.50 -56.4 -48.0 -55.6 81 -99 SPO 1997 10 11 22 07 63 5.6 -9 688.40 -56.4 -48.0 -55.6 80 -99 SPO 1997 10 11 22 08 63 5.7 -9 688.40 -56.4 -47.7 -55.6 81 -99 SPO 1997 10 11 22 09 62 5.9 -9 688.40 -56.4 -47.5 -55.7 81 -99 SPO 1997 10 11 22 10 61 5.8 -9 688.40 -56.4 -47.8 -55.6 81 -99 SPO 1997 10 11 22 11 60 5.9 -9 688.40 -56.4 -48.0 -55.7 81 -99 SPO 1997 10 11 22 12 59 6.0 -9 688.40 -56.4 -47.9 -55.7 81 -99 SPO 1997 10 11 22 13 57 6.0 -9 688.40 -56.2 -47.9 -55.6 78 -99 SPO 1997 10 11 22 14 57 6.0 -9 688.40 -56.2 -48.2 -55.5 78 -99 SPO 1997 10 11 22 15 56 6.5 -9 688.40 -56.2 -47.8 -55.6 77 -99 SPO 1997 10 11 22 16 55 6.5 -9 688.40 -56.2 -47.2 -55.6 76 -99 SPO 1997 10 11 22 17 54 6.6 -9 688.40 -56.2 -47.2 -55.6 77 -99 SPO 1997 10 11 22 18 55 6.9 -9 688.40 -56.2 -47.0 -55.6 76 -99 SPO 1997 10 11 22 19 55 6.8 -9 688.40 -56.2 -46.7 -55.6 77 -99 SPO 1997 10 11 22 20 56 6.6 -9 688.40 -56.2 -46.7 -55.6 76 -99 SPO 1997 10 11 22 21 58 6.3 -9 688.40 -56.2 -47.0 -55.6 76 -99 SPO 1997 10 11 22 22 59 6.2 -9 688.40 -56.2 -47.2 -55.6 77 -99 SPO 1997 10 11 22 23 59 6.0 -9 688.40 -56.2 -47.5 -55.5 78 -99 SPO 1997 10 11 22 24 59 6.2 -9 688.40 -56.2 -47.7 -55.6 78 -99 SPO 1997 10 11 22 25 59 6.2 -9 688.40 -56.2 -47.6 -55.5 78 -99 SPO 1997 10 11 22 26 59 5.6 -9 688.40 -56.2 -47.8 -55.5 77 -99 SPO 1997 10 11 22 27 60 5.5 -9 688.50 -56.2 -48.2 -55.5 77 -99 SPO 1997 10 11 22 28 62 5.6 -9 688.50 -56.2 -48.4 -55.5 77 -99 SPO 1997 10 11 22 29 62 5.5 -9 688.50 -56.2 -48.5 -55.4 78 -99 SPO 1997 10 11 22 30 62 5.8 -9 688.50 -56.2 -48.5 -55.4 78 -99 SPO 1997 10 11 22 31 62 6.0 -9 688.50 -56.2 -48.5 -55.5 78 -99 SPO 1997 10 11 22 32 62 6.0 -9 688.50 -56.2 -48.6 -55.5 78 -99 SPO 1997 10 11 22 33 63 6.0 -9 688.50 -56.2 -48.7 -55.4 79 -99 SPO 1997 10 11 22 34 65 6.0 -9 688.50 -56.0 -48.9 -55.3 78 -99 SPO 1997 10 11 22 35 65 6.1 -9 688.50 -56.0 -49.2 -55.3 78 -99 SPO 1997 10 11 22 36 63 6.3 -9 688.50 -56.0 -49.4 -55.4 78 -99 SPO 1997 10 11 22 37 61 6.5 -9 688.50 -56.0 -48.9 -55.4 78 -99 SPO 1997 10 11 22 38 61 6.3 -9 688.50 -56.0 -48.6 -55.6 79 -99 SPO 1997 10 11 22 39 63 6.0 -9 688.50 -56.0 -49.0 -55.6 79 -99 SPO 1997 10 11 22 40 65 5.7 -9 688.50 -56.0 -49.7 -55.7 79 -99 SPO 1997 10 11 22 41 67 5.8 -9 688.50 -56.0 -50.0 -55.7 79 -99 SPO 1997 10 11 22 42 67 6.0 -9 688.50 -56.0 -50.0 -55.7 79 -99 SPO 1997 10 11 22 43 66 6.1 -9 688.50 -56.0 -49.8 -55.7 79 -99 SPO 1997 10 11 22 44 65 6.1 -9 688.50 -56.0 -49.6 -55.6 79 -99 SPO 1997 10 11 22 45 64 6.1 -9 688.50 -55.7 -49.2 -55.4 78 -99 SPO 1997 10 11 22 46 66 5.8 -9 688.50 -55.7 -49.1 -55.2 79 -99 SPO 1997 10 11 22 47 70 5.7 -9 688.50 -55.9 -49.7 -55.3 80 -99 SPO 1997 10 11 22 48 70 5.9 -9 688.50 -56.0 -50.2 -55.3 82 -99 SPO 1997 10 11 22 49 69 5.8 -9 688.50 -56.0 -50.2 -55.3 82 -99 SPO 1997 10 11 22 50 67 6.0 -9 688.50 -55.9 -49.5 -55.2 80 -99 SPO 1997 10 11 22 51 69 5.8 -9 688.50 -55.7 -48.9 -55.1 79 -99 SPO 1997 10 11 22 52 70 5.3 -9 688.50 -55.9 -49.7 -55.2 80 -99 SPO 1997 10 11 22 53 71 5.2 -9 688.50 -56.0 -50.5 -55.2 80 -99 SPO 1997 10 11 22 54 72 5.3 -9 688.60 -56.0 -50.8 -55.2 80 -99 SPO 1997 10 11 22 55 72 5.4 -9 688.60 -56.0 -50.3 -55.2 80 -99 SPO 1997 10 11 22 56 71 5.5 -9 688.60 -56.0 -50.3 -55.2 80 -99 SPO 1997 10 11 22 57 74 5.0 -9 688.60 -56.2 -50.5 -55.2 83 -99 SPO 1997 10 11 22 58 75 4.9 -9 688.60 -56.2 -51.1 -55.4 83 -99 SPO 1997 10 11 22 59 74 5.5 -9 688.60 -56.4 -51.1 -55.6 84 -99 SPO 1997 10 11 23 00 70 5.9 -9 688.50 -56.2 -50.5 -55.9 82 0 SPO 1997 10 11 23 01 69 6.0 -9 688.60 -56.2 -50.1 -55.9 82 -99 SPO 1997 10 11 23 02 72 5.4 -9 688.60 -56.2 -50.3 -55.9 82 -99 SPO 1997 10 11 23 03 73 5.3 -9 688.60 -56.4 -50.8 -56.0 81 -99 SPO 1997 10 11 23 04 70 5.6 -9 688.50 -56.4 -51.2 -56.2 81 -99 SPO 1997 10 11 23 05 68 5.8 -9 688.50 -56.4 -50.9 -56.1 80 -99 SPO 1997 10 11 23 06 69 5.5 -9 688.50 -56.4 -50.8 -56.1 80 -99 SPO 1997 10 11 23 07 73 5.2 -9 688.60 -56.2 -50.9 -56.0 78 -99 SPO 1997 10 11 23 08 74 4.8 -9 688.60 -56.2 -50.9 -56.0 78 -99 SPO 1997 10 11 23 09 72 5.0 -9 688.60 -56.2 -51.3 -56.0 78 -99 SPO 1997 10 11 23 10 70 5.5 -9 688.60 -56.2 -50.7 -55.8 78 -99 SPO 1997 10 11 23 11 70 5.5 -9 688.60 -56.2 -50.1 -55.5 79 -99 SPO 1997 10 11 23 12 74 5.0 -9 688.60 -56.0 -50.2 -55.3 78 -99 SPO 1997 10 11 23 13 75 4.6 -9 688.60 -56.2 -50.8 -55.3 81 -99 SPO 1997 10 11 23 14 75 5.1 -9 688.60 -56.4 -51.2 -55.4 83 -99 SPO 1997 10 11 23 15 74 5.4 -9 688.60 -56.4 -51.2 -55.5 83 -99 SPO 1997 10 11 23 16 71 5.4 -9 688.60 -56.4 -51.0 -55.6 81 -99 SPO 1997 10 11 23 17 70 5.6 -9 688.60 -56.4 -50.3 -55.6 80 -99 SPO 1997 10 11 23 18 71 4.6 -9 688.60 -56.2 -50.5 -55.6 78 -99 SPO 1997 10 11 23 19 75 5.0 -9 688.60 -56.4 -50.8 -55.5 80 -99 SPO 1997 10 11 23 20 76 5.0 -9 688.60 -56.4 -50.7 -55.4 80 -99 SPO 1997 10 11 23 21 76 5.1 -9 688.60 -56.4 -50.9 -55.5 80 -99 SPO 1997 10 11 23 22 77 5.2 -9 688.60 -56.4 -50.7 -55.4 80 -99 SPO 1997 10 11 23 23 76 5.3 -9 688.60 -56.4 -50.7 -55.4 80 -99 SPO 1997 10 11 23 24 76 5.3 -9 688.60 -56.5 -50.7 -55.4 81 -99 SPO 1997 10 11 23 25 76 5.3 -9 688.60 -56.5 -50.6 -55.4 80 -99 SPO 1997 10 11 23 26 76 5.3 -9 688.60 -56.5 -50.5 -55.4 80 -99 SPO 1997 10 11 23 27 76 5.4 -9 688.60 -56.5 -50.4 -55.4 79 -99 SPO 1997 10 11 23 28 75 5.5 -9 688.60 -56.5 -50.1 -55.4 79 -99 SPO 1997 10 11 23 29 73 5.6 -9 688.60 -56.5 -49.4 -55.6 78 -99 SPO 1997 10 11 23 30 71 5.6 -9 688.60 -56.4 -48.8 -55.8 78 -99 SPO 1997 10 11 23 31 70 5.6 -9 688.60 -56.4 -48.4 -56.0 78 -99 SPO 1997 10 11 23 32 67 5.7 -9 688.60 -56.4 -48.0 -55.9 78 -99 SPO 1997 10 11 23 33 66 5.6 -9 688.60 -56.2 -47.7 -55.7 77 -99 SPO 1997 10 11 23 34 66 5.8 -9 688.60 -56.0 -47.6 -55.5 76 -99 SPO 1997 10 11 23 35 66 5.9 -9 688.60 -56.0 -47.6 -55.4 77 -99 SPO 1997 10 11 23 36 67 5.9 -9 688.60 -55.7 -47.6 -55.2 75 -99 SPO 1997 10 11 23 37 67 5.8 -9 688.60 -55.5 -47.5 -55.0 75 -99 SPO 1997 10 11 23 38 66 5.9 -9 688.60 -55.4 -47.5 -54.9 75 -99 SPO 1997 10 11 23 39 66 6.0 -9 688.60 -55.4 -47.4 -54.9 76 -99 SPO 1997 10 11 23 40 66 6.0 -9 688.60 -55.2 -47.2 -54.8 75 -99 SPO 1997 10 11 23 41 67 6.0 -9 688.60 -55.2 -47.3 -54.6 75 -99 SPO 1997 10 11 23 42 68 6.0 -9 688.60 -55.0 -47.4 -54.6 75 -99 SPO 1997 10 11 23 43 67 6.1 -9 688.60 -55.0 -47.2 -54.6 75 -99 SPO 1997 10 11 23 44 69 6.1 -9 688.60 -55.0 -47.4 -54.7 76 -99 SPO 1997 10 11 23 45 70 6.1 -9 688.60 -55.0 -48.0 -54.6 77 -99 SPO 1997 10 11 23 46 69 6.1 -9 688.50 -55.2 -48.4 -54.6 81 -99 SPO 1997 10 11 23 47 68 6.3 -9 688.50 -55.2 -48.1 -54.6 82 -99 SPO 1997 10 11 23 48 65 6.4 -9 688.50 -55.2 -47.7 -54.5 82 -99 SPO 1997 10 11 23 49 63 6.5 -9 688.40 -55.0 -47.2 -54.4 80 -99 SPO 1997 10 11 23 50 64 6.6 -9 688.40 -54.9 -46.8 -54.2 80 -99 SPO 1997 10 11 23 51 65 6.5 -9 688.40 -54.7 -46.0 -54.1 79 -99 SPO 1997 10 11 23 52 65 6.4 -9 688.40 -54.7 -46.6 -54.0 80 -99 SPO 1997 10 11 23 53 66 6.5 -9 688.40 -54.7 -47.0 -54.0 81 -99 SPO 1997 10 11 23 54 64 6.7 -9 688.40 -54.5 -47.0 -54.0 79 -99 SPO 1997 10 11 23 55 61 6.8 -9 688.40 -54.5 -46.4 -54.0 80 -99 SPO 1997 10 11 23 56 62 6.8 -9 688.40 -54.5 -46.4 -54.0 80 -99 SPO 1997 10 11 23 57 60 6.8 -9 688.40 -54.5 -45.9 -54.0 80 -99 SPO 1997 10 11 23 58 60 6.9 -9 688.40 -54.4 -45.3 -53.9 -99 -99 SPO 1997 10 11 23 59 61 6.9 -9 688.40 -54.2 -45.4 -53.8 -99 -99 SPO 1997 10 12 00 00 62 6.9 -9 688.40 -54.0 -45.3 -53.7 -99 0 SPO 1997 10 12 00 01 62 6.7 -9 688.40 -54.2 -45.6 -53.7 -99 -99 SPO 1997 10 12 00 02 62 7.0 -9 688.40 -54.2 -46.4 -53.7 -99 -99 SPO 1997 10 12 00 03 62 6.8 -9 688.40 -54.0 -46.1 -53.6 77 -99 SPO 1997 10 12 00 04 63 6.5 -9 688.40 -54.0 -47.0 -53.6 77 -99 SPO 1997 10 12 00 05 63 6.7 -9 688.40 -54.2 -47.8 -53.7 79 -99 SPO 1997 10 12 00 06 62 7.0 -9 688.40 -54.0 -47.4 -53.7 77 -99 SPO 1997 10 12 00 07 63 6.6 -9 688.40 -54.0 -47.0 -53.7 77 -99 SPO 1997 10 12 00 08 63 6.5 -9 688.40 -54.0 -47.8 -53.7 77 -99 SPO 1997 10 12 00 09 63 6.5 -9 688.40 -54.0 -48.0 -53.7 77 -99 SPO 1997 10 12 00 10 63 6.7 -9 688.40 -54.0 -48.0 -53.8 77 -99 SPO 1997 10 12 00 11 62 7.0 -9 688.30 -54.0 -47.4 -53.8 77 -99 SPO 1997 10 12 00 12 61 7.5 -9 688.30 -54.0 -46.5 -53.7 77 -99 SPO 1997 10 12 00 13 61 7.5 -9 688.30 -53.9 -45.9 -53.6 76 -99 SPO 1997 10 12 00 14 61 7.3 -9 688.30 -53.7 -45.8 -53.4 74 -99 SPO 1997 10 12 00 15 62 7.1 -9 688.30 -53.7 -46.0 -53.4 74 -99 SPO 1997 10 12 00 16 64 6.8 -9 688.30 -53.5 -46.4 -53.3 74 -99 SPO 1997 10 12 00 17 67 6.3 -9 688.30 -53.5 -47.1 -53.3 74 -99 SPO 1997 10 12 00 18 70 5.8 -9 688.30 -53.7 -47.7 -53.3 74 -99 SPO 1997 10 12 00 19 73 5.4 -9 688.40 -53.7 -48.3 -53.4 76 -99 SPO 1997 10 12 00 20 78 5.0 -9 688.40 -54.0 -48.8 -53.4 79 -99 SPO 1997 10 12 00 21 80 4.9 -9 688.40 -54.2 -49.1 -53.6 79 -99 SPO 1997 10 12 00 22 78 5.0 -9 688.40 -54.5 -49.2 -53.8 82 -99 SPO 1997 10 12 00 23 78 5.0 -9 688.30 -54.7 -49.2 -54.0 84 -99 SPO 1997 10 12 00 24 77 5.4 -9 688.30 -54.9 -49.2 -54.1 84 -99 SPO 1997 10 12 00 25 73 6.1 -9 688.30 -55.0 -48.9 -54.2 84 -99 SPO 1997 10 12 00 26 74 6.1 -9 688.30 -54.9 -48.5 -54.2 81 -99 SPO 1997 10 12 00 27 77 5.8 -9 688.40 -54.9 -48.7 -54.2 81 -99 SPO 1997 10 12 00 28 80 5.1 -9 688.40 -54.9 -49.0 -54.1 81 -99 SPO 1997 10 12 00 29 96 3.4 -9 688.40 -55.2 -49.4 -54.3 82 -99 SPO 1997 10 12 00 30 91 3.5 -9 688.40 -56.0 -50.0 -55.2 89 -99 SPO 1997 10 12 00 31 79 5.2 -9 688.40 -56.2 -49.6 -55.1 89 -99 SPO 1997 10 12 00 32 73 5.7 -9 688.40 -55.7 -49.0 -54.7 81 -99 SPO 1997 10 12 00 33 71 5.9 -9 688.40 -55.5 -48.4 -54.6 79 -99 SPO 1997 10 12 00 34 74 5.8 -9 688.40 -55.5 -48.4 -54.7 79 -99 SPO 1997 10 12 00 35 78 5.4 -9 688.40 -55.5 -48.6 -54.8 79 -99 SPO 1997 10 12 00 36 83 4.8 -9 688.40 -55.5 -49.0 -55.0 80 -99 SPO 1997 10 12 00 37 92 3.6 -9 688.40 -55.7 -49.4 -55.2 81 -99 SPO 1997 10 12 00 38 93 3.7 -9 688.40 -56.2 -49.9 -55.5 87 -99 SPO 1997 10 12 00 39 82 5.1 -9 688.40 -56.5 -49.6 -55.6 89 -99 SPO 1997 10 12 00 40 79 5.4 -9 688.30 -56.4 -49.1 -55.6 88 -99 SPO 1997 10 12 00 41 79 5.3 -9 688.30 -56.2 -48.9 -55.6 85 -99 SPO 1997 10 12 00 42 81 4.8 -9 688.40 -56.2 -48.8 -55.6 85 -99 SPO 1997 10 12 00 43 91 3.8 -9 688.40 -56.4 -49.1 -56.0 88 -99 SPO 1997 10 12 00 44 94 4.4 -9 688.40 -56.9 -49.4 -56.4 91 -99 SPO 1997 10 12 00 45 91 4.7 -9 688.40 -56.9 -49.3 -56.1 91 -99 SPO 1997 10 12 00 46 92 4.5 -9 688.40 -56.9 -49.2 -56.0 91 -99 SPO 1997 10 12 00 47 92 4.3 -9 688.40 -57.0 -49.3 -56.1 90 -99 SPO 1997 10 12 00 48 92 4.2 -9 688.40 -57.0 -49.4 -56.1 89 -99 SPO 1997 10 12 00 49 91 4.3 -9 688.40 -57.0 -49.6 -56.2 89 -99 SPO 1997 10 12 00 50 84 4.9 -9 688.30 -57.0 -49.4 -55.9 86 -99 SPO 1997 10 12 00 51 83 4.9 -9 688.30 -56.7 -49.0 -55.5 83 -99 SPO 1997 10 12 00 52 86 4.7 -9 688.40 -56.7 -49.0 -55.4 83 -99 SPO 1997 10 12 00 53 89 4.5 -9 688.40 -56.7 -49.1 -55.4 83 -99 SPO 1997 10 12 00 54 90 4.3 -9 688.40 -56.7 -49.2 -55.5 83 -99 SPO 1997 10 12 00 55 91 4.4 -9 688.40 -56.7 -49.1 -55.6 83 -99 SPO 1997 10 12 00 56 94 4.3 -9 688.40 -56.7 -49.1 -55.7 83 -99 SPO 1997 10 12 00 57 95 4.5 -9 688.40 -56.7 -49.2 -55.8 83 -99 SPO 1997 10 12 00 58 91 4.8 -9 688.40 -56.7 -49.1 -55.7 83 -99 SPO 1997 10 12 00 59 88 4.9 -9 688.40 -56.5 -48.9 -55.4 81 -99 SPO 1997 10 12 01 00 88 4.9 -9 688.40 -56.2 -48.8 -55.0 80 0 SPO 1997 10 12 01 01 96 4.3 -9 688.40 -56.2 -49.1 -55.2 81 -99 SPO 1997 10 12 01 02 96 4.3 -9 688.40 -56.5 -49.5 -55.5 86 -99 SPO 1997 10 12 01 03 87 4.8 -9 688.30 -56.2 -49.3 -55.2 83 -99 SPO 1997 10 12 01 04 85 5.0 -9 688.30 -56.0 -48.9 -54.7 83 -99 SPO 1997 10 12 01 05 88 4.9 -9 688.30 -55.7 -48.8 -54.4 81 -99 SPO 1997 10 12 01 06 91 4.8 -9 688.30 -55.7 -49.0 -54.5 81 -99 SPO 1997 10 12 01 07 88 4.9 -9 688.30 -55.7 -49.1 -54.6 81 -99 SPO 1997 10 12 01 08 84 5.2 -9 688.30 -55.7 -48.8 -54.5 81 -99 SPO 1997 10 12 01 09 84 5.3 -9 688.30 -55.7 -48.6 -54.4 81 -99 SPO 1997 10 12 01 10 86 5.1 -9 688.30 -55.7 -48.6 -54.3 83 -99 SPO 1997 10 12 01 11 90 4.8 -9 688.30 -55.7 -48.7 -54.5 86 -99 SPO 1997 10 12 01 12 91 4.9 -9 688.30 -56.0 -48.9 -54.7 89 -99 SPO 1997 10 12 01 13 88 5.0 -9 688.30 -55.9 -48.9 -54.6 88 -99 SPO 1997 10 12 01 14 85 5.0 -9 688.20 -55.5 -48.6 -54.3 84 -99 SPO 1997 10 12 01 15 86 5.1 -9 688.20 -55.5 -48.5 -54.1 84 -99 SPO 1997 10 12 01 16 87 5.0 -9 688.20 -55.5 -48.6 -54.2 84 -99 SPO 1997 10 12 01 17 89 4.9 -9 688.20 -55.7 -48.6 -54.4 86 -99 SPO 1997 10 12 01 18 90 4.9 -9 688.30 -55.7 -48.6 -54.5 86 -99 SPO 1997 10 12 01 19 93 4.8 -9 688.30 -55.7 -48.8 -54.6 86 -99 SPO 1997 10 12 01 20 92 5.0 -9 688.20 -56.0 -48.8 -54.8 89 -99 SPO 1997 10 12 01 21 91 5.1 -9 688.20 -55.7 -48.6 -54.6 83 -99 SPO 1997 10 12 01 22 93 5.0 -9 688.20 -55.7 -48.6 -54.6 83 -99 SPO 1997 10 12 01 23 90 5.2 -9 688.20 -55.7 -48.6 -54.6 83 -99 SPO 1997 10 12 01 24 85 5.5 -9 688.10 -55.7 -48.3 -54.4 81 -99 SPO 1997 10 12 01 25 81 5.6 -9 688.10 -55.7 -48.1 -54.3 81 -99 SPO 1997 10 12 01 26 80 5.7 -9 688.10 -55.7 -47.9 -54.3 81 -99 SPO 1997 10 12 01 27 80 5.7 -9 688.10 -55.7 -47.7 -54.4 79 -99 SPO 1997 10 12 01 28 80 5.6 -9 688.10 -55.7 -47.7 -54.3 79 -99 SPO 1997 10 12 01 29 80 5.5 -9 688.10 -55.5 -47.8 -54.2 75 -99 SPO 1997 10 12 01 30 80 5.4 -9 688.10 -55.5 -47.8 -54.2 74 -99 SPO 1997 10 12 01 31 80 5.4 -9 688.10 -55.5 -47.8 -54.2 74 -99 SPO 1997 10 12 01 32 80 5.4 -9 688.00 -55.5 -47.9 -54.2 72 -99 SPO 1997 10 12 01 33 79 5.3 -9 688.00 -55.5 -47.9 -54.2 72 -99 SPO 1997 10 12 01 34 79 5.3 -9 688.00 -55.7 -47.9 -54.3 74 -99 SPO 1997 10 12 01 35 79 5.3 -9 688.00 -55.7 -48.0 -54.4 74 -99 SPO 1997 10 12 01 36 79 5.3 -9 688.00 -55.9 -48.1 -54.4 76 -99 SPO 1997 10 12 01 37 79 5.3 -9 688.00 -56.0 -48.0 -54.6 77 -99 SPO 1997 10 12 01 38 79 5.3 -9 688.00 -56.0 -48.0 -54.6 77 -99 SPO 1997 10 12 01 39 79 5.3 -9 688.00 -56.2 -48.0 -54.6 80 -99 SPO 1997 10 12 01 40 79 5.3 -9 688.00 -56.2 -48.0 -54.7 80 -99 SPO 1997 10 12 01 41 80 5.2 -9 687.90 -56.2 -48.0 -54.7 80 -99 SPO 1997 10 12 01 42 79 5.2 -9 687.90 -56.0 -47.8 -54.7 79 -99 SPO 1997 10 12 01 43 78 5.3 -9 687.90 -56.0 -47.8 -54.8 79 -99 SPO 1997 10 12 01 44 76 5.4 -9 687.90 -56.0 -47.6 -54.7 79 -99 SPO 1997 10 12 01 45 76 5.4 -9 687.90 -55.9 -47.5 -54.6 79 -99 SPO 1997 10 12 01 46 76 5.5 -9 687.90 -55.7 -47.4 -54.6 76 -99 SPO 1997 10 12 01 47 74 5.7 -9 687.90 -55.7 -47.2 -54.6 77 -99 SPO 1997 10 12 01 48 73 5.9 -9 687.90 -55.5 -47.0 -54.6 75 -99 SPO 1997 10 12 01 49 73 6.0 -9 687.80 -55.4 -46.9 -54.6 76 -99 SPO 1997 10 12 01 50 72 6.1 -9 687.80 -54.8 -46.7 -54.5 72 -99 SPO 1997 10 12 01 51 71 6.3 -9 687.80 -54.7 -46.4 -54.5 72 -99 SPO 1997 10 12 01 52 71 6.3 -9 687.80 -54.6 -46.2 -54.5 73 -99 SPO 1997 10 12 01 53 71 6.2 -9 687.80 -54.4 -46.0 -54.4 72 -99 SPO 1997 10 12 01 54 71 6.3 -9 687.80 -54.3 -45.7 -54.2 72 -99 SPO 1997 10 12 01 55 71 6.2 -9 687.80 -54.3 -45.8 -54.2 73 -99 SPO 1997 10 12 01 56 72 6.1 -9 687.80 -54.2 -45.8 -54.2 74 -99 SPO 1997 10 12 01 57 74 5.8 -9 687.80 -54.2 -46.0 -54.4 74 -99 SPO 1997 10 12 01 58 76 5.3 -9 687.90 -54.4 -46.4 -54.2 76 -99 SPO 1997 10 12 01 59 82 4.3 -9 687.90 -54.6 -47.2 -54.1 -99 -99 SPO 1997 10 12 02 00 87 3.7 -9 687.80 -55.1 -48.4 -54.8 -99 0 SPO 1997 10 12 02 01 80 4.8 -9 687.80 -55.5 -48.6 -55.2 -99 -99 SPO 1997 10 12 02 02 79 5.6 -9 687.80 -55.4 -47.8 -55.0 -99 -99 SPO 1997 10 12 02 03 76 5.6 -9 687.80 -55.2 -47.1 -54.6 -99 -99 SPO 1997 10 12 02 04 76 5.5 -9 687.80 -55.0 -46.9 -54.4 -99 -99 SPO 1997 10 12 02 05 77 5.4 -9 687.80 -55.1 -47.0 -54.4 -99 -99 SPO 1997 10 12 02 06 79 5.0 -9 687.80 -55.2 -47.2 -54.5 -99 -99 SPO 1997 10 12 02 07 81 4.8 -9 687.80 -55.3 -47.6 -54.6 -99 -99 SPO 1997 10 12 02 08 82 4.8 -9 687.80 -55.4 -47.8 -54.7 -99 -99 SPO 1997 10 12 02 09 81 5.0 -9 687.80 -55.3 -47.7 -54.6 -99 -99 SPO 1997 10 12 02 10 79 4.9 -9 687.80 -55.1 -47.6 -54.4 -99 -99 SPO 1997 10 12 02 11 79 4.7 -9 687.80 -55.0 -47.6 -54.3 -99 -99 SPO 1997 10 12 02 12 79 4.6 -9 687.80 -54.9 -47.8 -54.2 -99 -99 SPO 1997 10 12 02 13 77 4.5 -9 687.80 -54.8 -48.0 -54.2 -99 -99 SPO 1997 10 12 02 14 76 4.5 -9 687.80 -54.8 -48.1 -54.2 -99 -99 SPO 1997 10 12 02 15 77 4.5 -9 687.80 -54.8 -48.2 -54.1 -99 -99 SPO 1997 10 12 02 16 76 4.4 -9 687.80 -54.8 -48.2 -54.0 -99 -99 SPO 1997 10 12 02 17 77 4.5 -9 687.80 -55.0 -48.2 -54.0 -99 -99 SPO 1997 10 12 02 18 79 4.5 -9 687.80 -55.2 -48.3 -54.1 -99 -99 SPO 1997 10 12 02 19 82 4.4 -9 687.80 -55.2 -48.2 -54.2 -99 -99 SPO 1997 10 12 02 20 81 4.4 -9 687.80 -55.3 -48.2 -54.2 -99 -99 SPO 1997 10 12 02 21 82 4.3 -9 687.80 -55.5 -48.1 -54.3 -99 -99 SPO 1997 10 12 02 22 83 4.3 -9 687.80 -55.6 -48.0 -54.5 -99 -99 SPO 1997 10 12 02 23 85 4.2 -9 687.80 -55.7 -48.0 -54.7 -99 -99 SPO 1997 10 12 02 24 86 4.4 -9 687.70 -55.6 -48.2 -54.7 -99 -99 SPO 1997 10 12 02 25 86 4.4 -9 687.70 -55.6 -48.4 -54.8 -99 -99 SPO 1997 10 12 02 26 87 4.4 -9 687.70 -55.6 -48.5 -54.8 -99 -99 SPO 1997 10 12 02 27 88 4.4 -9 687.70 -55.6 -48.6 -54.8 -99 -99 SPO 1997 10 12 02 28 89 4.5 -9 687.70 -55.6 -48.8 -54.8 -99 -99 SPO 1997 10 12 02 29 86 4.7 -9 687.70 -55.7 -48.9 -54.9 -99 -99 SPO 1997 10 12 02 30 83 4.9 -9 687.70 -55.8 -48.8 -54.8 -99 -99 SPO 1997 10 12 02 31 83 4.9 -9 687.60 -55.8 -48.7 -54.7 -99 -99 SPO 1997 10 12 02 32 83 4.8 -9 687.60 -55.8 -48.7 -54.7 -99 -99 SPO 1997 10 12 02 33 83 4.7 -9 687.60 -55.7 -48.7 -54.7 -99 -99 SPO 1997 10 12 02 34 84 4.6 -9 687.60 -55.8 -48.8 -54.8 -99 -99 SPO 1997 10 12 02 35 85 4.8 -9 687.60 -55.8 -48.9 -55.0 -99 -99 SPO 1997 10 12 02 36 87 4.8 -9 687.60 -55.9 -48.9 -55.1 -99 -99 SPO 1997 10 12 02 37 87 4.9 -9 687.60 -56.0 -49.0 -55.2 -99 -99 SPO 1997 10 12 02 38 85 5.0 -9 687.60 -56.0 -49.1 -55.3 -99 -99 SPO 1997 10 12 02 39 83 5.1 -9 687.60 -56.0 -49.0 -55.2 81 -99 SPO 1997 10 12 02 40 81 5.1 -9 687.60 -56.0 -48.8 -55.1 81 -99 SPO 1997 10 12 02 41 80 5.2 -9 687.60 -55.9 -48.4 -55.0 80 -99 SPO 1997 10 12 02 42 82 5.1 -9 687.60 -55.9 -48.3 -55.0 80 -99 SPO 1997 10 12 02 43 79 5.0 -9 687.60 -55.9 -48.3 -55.0 79 -99 SPO 1997 10 12 02 44 78 4.9 -9 687.60 -55.9 -48.2 -54.9 79 -99 SPO 1997 10 12 02 45 78 5.1 -9 687.60 -55.9 -48.2 -54.9 79 -99 SPO 1997 10 12 02 46 78 5.0 -9 687.60 -55.9 -48.2 -54.9 79 -99 SPO 1997 10 12 02 47 79 4.9 -9 687.60 -56.0 -48.4 -54.9 79 -99 SPO 1997 10 12 02 48 79 4.8 -9 687.60 -56.0 -48.5 -55.0 79 -99 SPO 1997 10 12 02 49 81 4.6 -9 687.60 -56.1 -48.8 -55.2 80 -99 SPO 1997 10 12 02 50 79 4.7 -9 687.50 -56.3 -49.0 -55.4 81 -99 SPO 1997 10 12 02 51 77 5.3 -9 687.50 -56.5 -48.8 -55.4 83 -99 SPO 1997 10 12 02 52 74 5.7 -9 687.50 -56.4 -48.3 -55.5 80 -99 SPO 1997 10 12 02 53 73 6.0 -9 687.40 -56.3 -47.8 -55.6 79 -99 SPO 1997 10 12 02 54 72 6.1 -9 687.40 -56.0 -47.2 -55.5 77 -99 SPO 1997 10 12 02 55 72 6.2 -9 687.40 -55.8 -46.7 -55.4 75 -99 SPO 1997 10 12 02 56 72 6.3 -9 687.40 -55.4 -46.3 -55.0 71 -99 SPO 1997 10 12 02 57 71 6.3 -9 687.40 -55.0 -46.0 -54.7 70 -99 SPO 1997 10 12 02 58 70 6.3 -9 687.40 -54.8 -45.8 -54.6 71 -99 SPO 1997 10 12 02 59 70 6.4 -9 687.40 -54.6 -45.8 -54.4 69 -99 SPO 1997 10 12 03 00 71 6.4 -9 687.40 -54.5 -45.7 -54.3 70 0 SPO 1997 10 12 03 01 71 6.4 -9 687.40 -54.4 -45.0 -54.2 70 -99 SPO 1997 10 12 03 02 71 6.3 -9 687.40 -54.3 -44.7 -54.1 71 -99 SPO 1997 10 12 03 03 71 6.3 -9 687.40 -54.3 -45.0 -54.1 72 -99 SPO 1997 10 12 03 04 71 6.2 -9 687.40 -54.2 -45.1 -54.1 74 -99 SPO 1997 10 12 03 05 72 6.2 -9 687.40 -54.2 -45.5 -54.0 74 -99 SPO 1997 10 12 03 06 73 6.3 -9 687.40 -54.2 -46.0 -54.0 76 -99 SPO 1997 10 12 03 07 74 6.2 -9 687.40 -54.2 -46.0 -53.9 76 -99 SPO 1997 10 12 03 08 74 6.2 -9 687.40 -54.1 -45.8 -53.8 76 -99 SPO 1997 10 12 03 09 75 6.0 -9 687.40 -54.1 -45.6 -53.8 76 -99 SPO 1997 10 12 03 10 74 6.2 -9 687.40 -54.0 -45.3 -53.7 75 -99 SPO 1997 10 12 03 11 73 6.3 -9 687.40 -54.0 -44.9 -53.7 75 -99 SPO 1997 10 12 03 12 71 6.3 -9 687.40 -54.0 -44.6 -53.8 75 -99 SPO 1997 10 12 03 13 71 6.2 -9 687.40 -53.9 -44.2 -53.7 74 -99 SPO 1997 10 12 03 14 70 6.3 -9 687.40 -53.9 -44.2 -53.7 73 -99 SPO 1997 10 12 03 15 69 6.3 -9 687.40 -53.8 -44.0 -53.6 73 -99 SPO 1997 10 12 03 16 69 6.3 -9 687.40 -53.8 -44.3 -53.6 73 -99 SPO 1997 10 12 03 17 69 6.3 -9 687.30 -53.7 -44.8 -53.5 73 -99 SPO 1997 10 12 03 18 69 6.3 -9 687.30 -53.6 -45.2 -53.5 73 -99 SPO 1997 10 12 03 19 69 6.2 -9 687.30 -53.6 -45.5 -53.5 73 -99 SPO 1997 10 12 03 20 69 6.3 -9 687.30 -53.6 -45.4 -53.4 75 -99 SPO 1997 10 12 03 21 69 6.3 -9 687.30 -53.6 -45.6 -53.4 75 -99 SPO 1997 10 12 03 22 69 6.3 -9 687.30 -53.6 -45.5 -53.4 75 -99 SPO 1997 10 12 03 23 68 6.3 -9 687.30 -53.6 -45.4 -53.4 76 -99 SPO 1997 10 12 03 24 68 6.4 -9 687.30 -53.5 -45.2 -53.4 75 -99 SPO 1997 10 12 03 25 68 6.5 -9 687.30 -53.4 -45.4 -53.3 74 -99 SPO 1997 10 12 03 26 68 6.6 -9 687.30 -53.3 -45.4 -53.3 74 -99 SPO 1997 10 12 03 27 67 6.6 -9 687.30 -53.2 -45.0 -53.3 73 -99 SPO 1997 10 12 03 28 67 6.6 -9 687.30 -53.1 -44.6 -53.2 72 -99 SPO 1997 10 12 03 29 66 6.7 -9 687.30 -53.0 -44.1 -53.1 73 -99 SPO 1997 10 12 03 30 65 6.8 -9 687.20 -53.0 -43.7 -53.1 73 -99 SPO 1997 10 12 03 31 65 6.9 -9 687.20 -53.0 -43.4 -53.1 74 -99 SPO 1997 10 12 03 32 65 6.9 -9 687.20 -52.9 -43.3 -53.0 74 -99 SPO 1997 10 12 03 33 64 7.0 -9 687.20 -52.8 -43.4 -52.9 73 -99 SPO 1997 10 12 03 34 63 7.0 -9 687.20 -52.8 -43.0 -52.9 74 -99 SPO 1997 10 12 03 35 62 7.1 -9 687.20 -52.8 -42.4 -52.9 74 -99 SPO 1997 10 12 03 36 61 7.2 -9 687.20 -52.8 -42.0 -52.9 75 -99 SPO 1997 10 12 03 37 61 7.1 -9 687.20 -52.8 -41.8 -52.9 75 -99 SPO 1997 10 12 03 38 62 7.0 -9 687.20 -52.7 -41.9 -52.8 75 -99 SPO 1997 10 12 03 39 62 6.9 -9 687.10 -52.7 -41.8 -52.8 75 -99 SPO 1997 10 12 03 40 62 7.0 -9 687.10 -52.7 -41.5 -52.8 75 -99 SPO 1997 10 12 03 41 62 7.0 -9 687.10 -52.7 -41.5 -52.8 75 -99 SPO 1997 10 12 03 42 63 6.9 -9 687.10 -52.6 -41.8 -52.8 74 -99 SPO 1997 10 12 03 43 63 6.8 -9 687.10 -52.6 -42.1 -52.7 75 -99 SPO 1997 10 12 03 44 64 6.7 -9 687.10 -52.7 -42.5 -52.8 76 -99 SPO 1997 10 12 03 45 64 6.7 -9 687.10 -52.7 -42.8 -52.8 76 -99 SPO 1997 10 12 03 46 64 6.7 -9 687.10 -52.7 -42.9 -52.8 75 -99 SPO 1997 10 12 03 47 65 6.6 -9 687.10 -52.7 -42.8 -52.8 75 -99 SPO 1997 10 12 03 48 66 6.7 -9 687.10 -52.7 -42.8 -52.8 75 -99 SPO 1997 10 12 03 49 67 6.7 -9 687.10 -52.7 -43.2 -52.8 75 -99 SPO 1997 10 12 03 50 67 6.7 -9 687.10 -52.7 -43.5 -52.8 75 -99 SPO 1997 10 12 03 51 67 6.7 -9 687.10 -52.6 -43.4 -52.7 74 -99 SPO 1997 10 12 03 52 67 6.9 -9 687.10 -52.7 -43.4 -52.7 75 -99 SPO 1997 10 12 03 53 67 6.8 -9 687.10 -52.7 -43.4 -52.7 75 -99 SPO 1997 10 12 03 54 67 6.8 -9 687.10 -52.6 -43.4 -52.7 74 -99 SPO 1997 10 12 03 55 66 6.8 -9 687.10 -52.6 -43.2 -52.7 74 -99 SPO 1997 10 12 03 56 66 6.8 -9 687.10 -52.6 -43.2 -52.7 74 -99 SPO 1997 10 12 03 57 67 6.8 -9 687.10 -52.7 -43.2 -52.7 75 -99 SPO 1997 10 12 03 58 67 6.8 -9 687.10 -52.7 -43.2 -52.8 -99 -99 SPO 1997 10 12 03 59 70 6.6 -9 687.10 -52.8 -43.4 -52.8 -99 -99 SPO 1997 10 12 04 00 71 6.5 -9 687.10 -52.8 -43.8 -52.8 -99 0 SPO 1997 10 12 04 01 71 6.5 -9 687.10 -52.8 -43.9 -52.8 -99 -99 SPO 1997 10 12 04 02 73 6.4 -9 687.10 -52.8 -44.1 -52.7 -99 -99 SPO 1997 10 12 04 03 73 6.3 -9 687.10 -52.8 -44.2 -52.7 -99 -99 SPO 1997 10 12 04 04 72 6.3 -9 687.10 -52.9 -44.2 -52.7 -99 -99 SPO 1997 10 12 04 05 73 6.2 -9 687.10 -52.9 -44.6 -52.7 -99 -99 SPO 1997 10 12 04 06 76 6.0 -9 687.10 -52.9 -45.0 -52.6 -99 -99 SPO 1997 10 12 04 07 80 5.6 -9 687.10 -53.0 -45.5 -52.5 -99 -99 SPO 1997 10 12 04 08 88 4.7 -9 687.10 -53.2 -46.3 -52.6 -99 -99 SPO 1997 10 12 04 09 113 3.2 -9 687.20 -53.8 -47.6 -53.6 -99 -99 SPO 1997 10 12 04 10 102 4.3 -9 687.10 -54.5 -48.6 -54.6 -99 -99 SPO 1997 10 12 04 11 97 4.4 -9 687.10 -53.7 -48.1 -53.6 -99 -99 SPO 1997 10 12 04 12 104 3.8 -9 687.20 -53.6 -48.0 -53.3 -99 -99 SPO 1997 10 12 04 13 104 3.9 -9 687.20 -54.0 -48.8 -54.0 -99 -99 SPO 1997 10 12 04 14 112 3.4 -9 687.20 -54.6 -49.0 -54.6 -99 -99 SPO 1997 10 12 04 15 105 3.6 -9 687.10 -55.0 -49.0 -55.0 -99 -99 SPO 1997 10 12 04 16 102 3.8 -9 687.10 -55.1 -48.9 -55.0 -99 -99 SPO 1997 10 12 04 17 107 3.7 -9 687.10 -55.0 -48.8 -55.0 -99 -99 SPO 1997 10 12 04 18 114 3.8 -9 687.10 -55.1 -49.2 -55.0 -99 -99 SPO 1997 10 12 04 19 116 3.9 -9 687.10 -55.0 -49.6 -55.0 -99 -99 SPO 1997 10 12 04 20 113 4.1 -9 687.20 -54.8 -49.8 -54.8 -99 -99 SPO 1997 10 12 04 21 108 4.2 -9 687.10 -55.9 -49.8 -54.8 -99 -99 SPO 1997 10 12 04 22 104 4.2 -9 687.10 -55.9 -49.5 -54.7 -99 -99 SPO 1997 10 12 04 23 101 4.4 -9 687.10 -55.7 -49.2 -54.6 -99 -99 SPO 1997 10 12 04 24 98 4.4 -9 687.10 -55.7 -48.8 -54.5 -99 -99 SPO 1997 10 12 04 25 98 4.3 -9 687.10 -55.5 -48.4 -54.4 -99 -99 SPO 1997 10 12 04 26 101 4.3 -9 687.10 -55.5 -48.5 -54.5 -99 -99 SPO 1997 10 12 04 27 109 4.2 -9 687.10 -56.0 -48.9 -54.9 -99 -99 SPO 1997 10 12 04 28 114 4.2 -9 687.10 -56.2 -49.4 -55.2 -99 -99 SPO 1997 10 12 04 29 111 4.2 -9 687.10 -56.2 -49.5 -55.2 -99 -99 SPO 1997 10 12 04 30 108 4.3 -9 687.10 -56.0 -49.3 -55.2 -99 -99 SPO 1997 10 12 04 31 107 4.1 -9 687.10 -56.0 -49.0 -55.3 -99 -99 SPO 1997 10 12 04 32 108 4.1 -9 687.10 -56.2 -48.9 -55.4 -99 -99 SPO 1997 10 12 04 33 112 4.3 -9 687.00 -56.2 -49.0 -55.4 -99 -99 SPO 1997 10 12 04 34 111 4.2 -9 687.00 -56.2 -49.1 -55.4 -99 -99 SPO 1997 10 12 04 35 111 4.3 -9 687.00 -56.2 -49.0 -55.4 -99 -99 SPO 1997 10 12 04 36 109 4.6 -9 687.00 -56.2 -49.0 -55.2 -99 -99 SPO 1997 10 12 04 37 106 4.6 -9 687.00 -56.0 -49.0 -55.1 -99 -99 SPO 1997 10 12 04 38 104 4.8 -9 687.00 -55.7 -48.8 -54.8 -99 -99 SPO 1997 10 12 04 39 102 4.8 -9 687.00 -55.7 -48.8 -54.8 -99 -99 SPO 1997 10 12 04 40 100 4.8 -9 687.00 -55.5 -48.7 -54.7 -99 -99 SPO 1997 10 12 04 41 100 4.7 -9 687.00 -55.5 -48.7 -54.6 -99 -99 SPO 1997 10 12 04 42 99 4.7 -9 687.00 -55.5 -48.6 -54.6 -99 -99 SPO 1997 10 12 04 43 102 4.5 -9 687.00 -55.5 -48.6 -54.7 -99 -99 SPO 1997 10 12 04 44 107 4.5 -9 687.00 -55.5 -48.8 -54.8 -99 -99 SPO 1997 10 12 04 45 110 4.5 -9 687.10 -55.5 -49.0 -54.9 -99 -99 SPO 1997 10 12 04 46 111 4.5 -9 687.10 -55.5 -49.0 -55.0 -99 -99 SPO 1997 10 12 04 47 112 4.5 -9 687.10 -55.5 -49.0 -55.0 -99 -99 SPO 1997 10 12 04 48 110 4.5 -9 687.10 -55.7 -49.0 -55.1 -99 -99 SPO 1997 10 12 04 49 109 4.6 -9 687.10 -55.7 -48.9 -55.1 -99 -99 SPO 1997 10 12 04 50 109 4.5 -9 687.10 -55.7 -48.8 -55.1 -99 -99 SPO 1997 10 12 04 51 106 4.6 -9 687.00 -55.5 -48.6 -55.0 -99 -99 SPO 1997 10 12 04 52 104 4.6 -9 687.00 -55.5 -48.4 -54.9 -99 -99 SPO 1997 10 12 04 53 102 4.6 -9 687.00 -55.4 -48.2 -54.8 -99 -99 SPO 1997 10 12 04 54 102 4.6 -9 687.00 -55.2 -48.0 -54.8 -99 -99 SPO 1997 10 12 04 55 100 4.6 -9 687.00 -55.2 -47.9 -54.7 -99 -99 SPO 1997 10 12 04 56 100 4.6 -9 687.00 -55.2 -47.9 -54.7 -99 -99 SPO 1997 10 12 04 57 101 4.6 -9 687.00 -55.4 -48.0 -54.8 -99 -99 SPO 1997 10 12 04 58 102 4.6 -9 687.00 -55.4 -48.1 -54.9 -99 -99 SPO 1997 10 12 04 59 101 4.6 -9 687.00 -55.4 -48.1 -54.9 -99 -99 SPO 1997 10 12 05 00 100 4.6 -9 687.00 -55.4 -48.1 -54.8 -99 0 SPO 1997 10 12 05 01 98 4.8 -9 686.90 -55.4 -48.0 -54.8 -99 -99 SPO 1997 10 12 05 02 97 4.9 -9 686.90 -55.2 -47.9 -54.6 -99 -99 SPO 1997 10 12 05 03 96 4.9 -9 686.90 -55.0 -47.8 -54.6 -99 -99 SPO 1997 10 12 05 04 96 4.9 -9 686.90 -55.0 -47.7 -54.5 -99 -99 SPO 1997 10 12 05 05 97 4.8 -9 686.90 -54.9 -47.6 -54.4 -99 -99 SPO 1997 10 12 05 06 96 4.8 -9 686.90 -54.7 -47.7 -54.3 -99 -99 SPO 1997 10 12 05 07 95 4.8 -9 686.90 -54.7 -47.6 -54.2 -99 -99 SPO 1997 10 12 05 08 95 4.9 -9 686.90 -54.7 -47.5 -54.2 -99 -99 SPO 1997 10 12 05 09 94 4.8 -9 686.80 -54.7 -47.6 -54.2 -99 -99 SPO 1997 10 12 05 10 93 4.8 -9 686.80 -54.7 -47.7 -54.2 -99 -99 SPO 1997 10 12 05 11 93 4.8 -9 686.80 -55.0 -47.7 -54.3 -99 -99 SPO 1997 10 12 05 12 94 4.6 -9 686.80 -55.0 -47.9 -54.4 -99 -99 SPO 1997 10 12 05 13 95 4.6 -9 686.80 -55.2 -48.2 -54.6 -99 -99 SPO 1997 10 12 05 14 97 4.4 -9 686.80 -54.3 -48.5 -54.8 -99 -99 SPO 1997 10 12 05 15 98 4.3 -9 686.80 -54.4 -48.7 -54.9 -99 -99 SPO 1997 10 12 05 16 98 4.4 -9 686.80 -55.5 -48.8 -55.0 -99 -99 SPO 1997 10 12 05 17 98 4.5 -9 686.80 -55.5 -48.8 -54.8 -99 -99 SPO 1997 10 12 05 18 98 4.6 -9 686.80 -55.2 -48.8 -54.7 -99 -99 SPO 1997 10 12 05 19 98 4.7 -9 686.80 -55.2 -48.9 -54.7 -99 -99 SPO 1997 10 12 05 20 97 5.0 -9 686.80 -55.0 -48.9 -54.6 -99 -99 SPO 1997 10 12 05 21 95 5.0 -9 686.80 -55.0 -48.9 -54.4 -99 -99 SPO 1997 10 12 05 22 92 5.2 -9 686.80 -54.9 -48.7 -54.2 -99 -99 SPO 1997 10 12 05 23 90 5.2 -9 686.80 -54.7 -48.5 -54.1 -99 -99 SPO 1997 10 12 05 24 89 5.2 -9 686.70 -54.5 -48.3 -53.9 -99 -99 SPO 1997 10 12 05 25 87 5.3 -9 686.70 -54.4 -48.0 -53.8 -99 -99 SPO 1997 10 12 05 26 85 5.4 -9 686.70 -54.2 -47.9 -53.7 -99 -99 SPO 1997 10 12 05 27 84 5.5 -9 686.70 -54.2 -47.6 -53.6 -99 -99 SPO 1997 10 12 05 28 84 5.4 -9 686.70 -54.2 -47.4 -53.6 -99 -99 SPO 1997 10 12 05 29 86 5.3 -9 686.70 -54.2 -47.4 -53.6 -99 -99 SPO 1997 10 12 05 30 89 5.3 -9 686.70 -54.4 -47.5 -53.6 -99 -99 SPO 1997 10 12 05 31 92 5.1 -9 686.70 -54.4 -47.7 -53.8 -99 -99 SPO 1997 10 12 05 32 92 5.1 -9 686.70 -54.5 -47.8 -53.9 -99 -99 SPO 1997 10 12 05 33 90 5.1 -9 686.70 -54.5 -47.8 -53.8 -99 -99 SPO 1997 10 12 05 34 89 5.1 -9 686.70 -54.4 -47.6 -53.7 -99 -99 SPO 1997 10 12 05 35 90 5.1 -9 686.70 -54.4 -47.6 -53.7 -99 -99 SPO 1997 10 12 05 36 93 5.0 -9 686.70 -54.5 -47.8 -53.8 -99 -99 SPO 1997 10 12 05 37 95 4.9 -9 686.70 -54.7 -48.0 -53.9 -99 -99 SPO 1997 10 12 05 38 99 4.7 -9 686.80 -54.7 -48.4 -54.2 -99 -99 SPO 1997 10 12 05 39 103 4.6 -9 686.80 -55.0 -48.7 -54.4 -99 -99 SPO 1997 10 12 05 40 105 4.6 -9 686.80 -55.2 -49.0 -54.7 -99 -99 SPO 1997 10 12 05 41 104 4.7 -9 686.70 -55.2 -49.1 -54.6 -99 -99 SPO 1997 10 12 05 42 103 4.6 -9 686.70 -55.2 -49.0 -54.6 -99 -99 SPO 1997 10 12 05 43 99 4.7 -9 686.70 -55.0 -48.8 -54.3 -99 -99 SPO 1997 10 12 05 44 97 4.7 -9 686.70 -55.0 -48.7 -54.2 -99 -99 SPO 1997 10 12 05 45 96 4.8 -9 686.70 -54.7 -48.5 -54.0 -99 -99 SPO 1997 10 12 05 46 97 4.9 -9 686.70 -54.7 -48.4 -53.9 -99 -99 SPO 1997 10 12 05 47 98 4.9 -9 686.70 -54.7 -48.5 -53.8 -99 -99 SPO 1997 10 12 05 48 100 4.9 -9 686.70 -54.7 -48.5 -53.8 -99 -99 SPO 1997 10 12 05 49 99 5.0 -9 686.70 -54.7 -48.4 -53.9 -99 -99 SPO 1997 10 12 05 50 98 5.0 -9 686.70 -54.5 -48.2 -53.8 -99 -99 SPO 1997 10 12 05 51 98 5.1 -9 686.60 -54.5 -48.0 -53.6 -99 -99 SPO 1997 10 12 05 52 97 5.1 -9 686.60 -54.2 -47.8 -53.5 -99 -99 SPO 1997 10 12 05 53 96 5.2 -9 686.60 -54.2 -47.6 -53.4 -99 -99 SPO 1997 10 12 05 54 96 5.2 -9 686.60 -54.2 -47.5 -53.3 -99 -99 SPO 1997 10 12 05 55 97 5.0 -9 686.60 -54.0 -47.5 -53.2 -99 -99 SPO 1997 10 12 05 56 100 4.9 -9 686.60 -54.0 -47.6 -53.1 -99 -99 SPO 1997 10 12 05 57 103 4.8 -9 686.60 -54.0 -47.7 -53.1 -99 -99 SPO 1997 10 12 05 58 103 4.7 -9 686.60 -54.0 -47.8 -53.0 -99 -99 SPO 1997 10 12 05 59 102 4.6 -9 686.60 -54.0 -47.8 -53.0 -99 -99 SPO 1997 10 12 06 00 100 4.7 -9 686.60 -54.0 -47.8 -52.9 -99 0 SPO 1997 10 12 06 01 97 4.8 -9 686.60 -54.0 -47.7 -52.9 -99 -99 SPO 1997 10 12 06 02 95 4.9 -9 686.60 -54.0 -47.2 -52.9 -99 -99 SPO 1997 10 12 06 03 95 4.9 -9 686.60 -53.9 -46.8 -52.7 -99 -99 SPO 1997 10 12 06 04 95 5.0 -9 686.50 -53.9 -46.4 -52.7 84 -99 SPO 1997 10 12 06 05 95 5.2 -9 686.50 -53.7 -46.4 -52.6 82 -99 SPO 1997 10 12 06 06 94 5.3 -9 686.50 -53.7 -46.2 -52.6 82 -99 SPO 1997 10 12 06 07 95 5.3 -9 686.50 -53.7 -46.1 -52.5 84 -99 SPO 1997 10 12 06 08 96 5.3 -9 686.50 -53.7 -46.4 -52.5 84 -99 SPO 1997 10 12 06 09 96 5.2 -9 686.50 -53.7 -46.8 -52.6 84 -99 SPO 1997 10 12 06 10 95 5.2 -9 686.50 -53.7 -47.2 -52.6 84 -99 SPO 1997 10 12 06 11 95 5.1 -9 686.50 -53.9 -47.1 -52.6 84 -99 SPO 1997 10 12 06 12 94 5.1 -9 686.50 -53.7 -47.2 -52.5 82 -99 SPO 1997 10 12 06 13 94 5.0 -9 686.40 -53.9 -47.4 -52.5 84 -99 SPO 1997 10 12 06 14 94 5.1 -9 686.40 -53.9 -47.5 -52.4 84 -99 SPO 1997 10 12 06 15 92 5.1 -9 686.40 -53.9 -47.5 -52.4 84 -99 SPO 1997 10 12 06 16 90 5.1 -9 686.40 -53.7 -47.2 -52.4 82 -99 SPO 1997 10 12 06 17 90 5.1 -9 686.40 -53.7 -47.0 -52.3 84 -99 SPO 1997 10 12 06 18 90 5.1 -9 686.40 -53.7 -46.9 -52.3 84 -99 SPO 1997 10 12 06 19 91 5.0 -9 686.40 -53.7 -46.9 -52.3 84 -99 SPO 1997 10 12 06 20 92 4.9 -9 686.40 -54.0 -47.2 -52.4 87 -99 SPO 1997 10 12 06 21 92 4.9 -9 686.40 -54.0 -47.6 -52.5 87 -99 SPO 1997 10 12 06 22 91 4.9 -9 686.40 -54.0 -47.8 -52.5 85 -99 SPO 1997 10 12 06 23 91 5.0 -9 686.40 -54.0 -48.0 -52.5 85 -99 SPO 1997 10 12 06 24 91 5.1 -9 686.40 -54.0 -47.9 -52.5 85 -99 SPO 1997 10 12 06 25 89 5.1 -9 686.40 -54.0 -47.8 -52.5 84 -99 SPO 1997 10 12 06 26 89 5.2 -9 686.40 -54.0 -47.6 -52.4 84 -99 SPO 1997 10 12 06 27 89 5.3 -9 686.40 -53.7 -47.7 -52.3 81 -99 SPO 1997 10 12 06 28 88 5.4 -9 686.30 -53.7 -47.6 -52.2 81 -99 SPO 1997 10 12 06 29 87 5.4 -9 686.30 -53.7 -47.5 -52.2 82 -99 SPO 1997 10 12 06 30 85 5.4 -9 686.30 -53.5 -47.4 -52.2 80 -99 SPO 1997 10 12 06 31 86 5.5 -9 686.30 -53.5 -47.5 -52.2 80 -99 SPO 1997 10 12 06 32 87 5.5 -9 686.30 -53.5 -47.7 -52.2 80 -99 SPO 1997 10 12 06 33 87 5.5 -9 686.30 -53.5 -48.0 -52.2 82 -99 SPO 1997 10 12 06 34 88 5.5 -9 686.30 -53.7 -48.2 -52.2 84 -99 SPO 1997 10 12 06 35 89 5.5 -9 686.30 -53.7 -48.2 -52.3 82 -99 SPO 1997 10 12 06 36 89 5.5 -9 686.20 -53.7 -48.2 -52.3 82 -99 SPO 1997 10 12 06 37 89 5.6 -9 686.20 -53.7 -48.1 -52.4 81 -99 SPO 1997 10 12 06 38 90 5.7 -9 686.20 -53.9 -48.0 -52.4 83 -99 SPO 1997 10 12 06 39 90 5.7 -9 686.30 -53.9 -48.0 -52.4 83 -99 SPO 1997 10 12 06 40 91 5.5 -9 686.30 -53.9 -48.0 -52.4 84 -99 SPO 1997 10 12 06 41 91 5.5 -9 686.30 -54.0 -48.1 -52.5 84 -99 SPO 1997 10 12 06 42 91 5.5 -9 686.30 -54.0 -48.0 -52.6 84 -99 SPO 1997 10 12 06 43 92 5.5 -9 686.30 -54.2 -47.9 -52.6 86 -99 SPO 1997 10 12 06 44 93 5.5 -9 686.20 -54.2 -48.0 -52.7 86 -99 SPO 1997 10 12 06 45 92 5.5 -9 686.20 -54.2 -48.0 -52.7 86 -99 SPO 1997 10 12 06 46 93 5.6 -9 686.20 -54.0 -47.9 -52.6 84 -99 SPO 1997 10 12 06 47 92 5.5 -9 686.20 -54.0 -47.8 -52.6 84 -99 SPO 1997 10 12 06 48 93 5.6 -9 686.20 -54.0 -47.8 -52.6 84 -99 SPO 1997 10 12 06 49 92 5.6 -9 686.20 -54.0 -47.8 -52.6 82 -99 SPO 1997 10 12 06 50 91 5.6 -9 686.20 -53.7 -47.9 -52.4 79 -99 SPO 1997 10 12 06 51 89 5.5 -9 686.10 -53.7 -47.8 -52.3 81 -99 SPO 1997 10 12 06 52 87 5.5 -9 686.20 -53.5 -47.7 -52.2 79 -99 SPO 1997 10 12 06 53 87 5.5 -9 686.20 -53.4 -47.7 -52.0 78 -99 SPO 1997 10 12 06 54 89 5.5 -9 686.20 -53.4 -47.8 -51.9 79 -99 SPO 1997 10 12 06 55 90 5.4 -9 686.20 -53.2 -47.7 -51.9 79 -99 SPO 1997 10 12 06 56 91 5.3 -9 686.20 -53.2 -47.7 -51.9 79 -99 SPO 1997 10 12 06 57 91 5.3 -9 686.20 -53.4 -47.8 -52.0 83 -99 SPO 1997 10 12 06 58 92 5.3 -9 686.20 -53.5 -47.8 -52.1 84 -99 SPO 1997 10 12 06 59 92 5.2 -9 686.10 -53.5 -48.1 -52.1 84 -99 SPO 1997 10 12 07 00 91 5.1 -9 686.10 -53.7 -48.1 -52.2 86 0 SPO 1997 10 12 07 01 91 5.1 -9 686.10 -53.7 -48.2 -52.2 86 -99 SPO 1997 10 12 07 02 89 5.2 -9 686.10 -53.7 -48.1 -52.2 86 -99 SPO 1997 10 12 07 03 88 5.3 -9 686.10 -53.7 -48.0 -52.2 84 -99 SPO 1997 10 12 07 04 87 5.3 -9 686.10 -53.7 -47.9 -52.1 84 -99 SPO 1997 10 12 07 05 86 5.4 -9 686.10 -53.5 -47.8 -52.1 82 -99 SPO 1997 10 12 07 06 86 5.5 -9 686.10 -53.5 -47.7 -52.1 82 -99 SPO 1997 10 12 07 07 84 5.6 -9 686.10 -53.5 -47.6 -52.0 82 -99 SPO 1997 10 12 07 08 82 5.8 -9 686.10 -53.4 -47.4 -52.0 81 -99 SPO 1997 10 12 07 09 83 5.8 -9 686.00 -53.2 -47.0 -51.9 79 -99 SPO 1997 10 12 07 10 84 5.7 -9 686.00 -53.2 -46.9 -51.8 79 -99 SPO 1997 10 12 07 11 84 5.8 -9 686.00 -53.2 -46.7 -51.8 81 -99 SPO 1997 10 12 07 12 85 5.8 -9 686.00 -53.2 -46.5 -51.8 81 -99 SPO 1997 10 12 07 13 86 5.8 -9 686.00 -53.2 -46.4 -51.8 81 -99 SPO 1997 10 12 07 14 86 5.9 -9 686.00 -53.2 -46.4 -51.8 82 -99 SPO 1997 10 12 07 15 86 6.0 -9 686.00 -53.2 -46.6 -51.8 82 -99 SPO 1997 10 12 07 16 87 6.0 -9 686.00 -53.2 -46.8 -51.8 82 -99 SPO 1997 10 12 07 17 86 6.0 -9 686.00 -53.2 -46.8 -51.8 82 -99 SPO 1997 10 12 07 18 87 6.0 -9 686.00 -53.2 -47.0 -51.8 82 -99 SPO 1997 10 12 07 19 87 6.0 -9 686.00 -53.2 -47.1 -51.9 82 -99 SPO 1997 10 12 07 20 87 6.0 -9 685.90 -53.2 -47.1 -51.9 82 -99 SPO 1997 10 12 07 21 86 6.0 -9 685.90 -53.2 -47.2 -51.9 82 -99 SPO 1997 10 12 07 22 85 6.1 -9 685.90 -53.2 -47.0 -51.8 82 -99 SPO 1997 10 12 07 23 83 6.2 -9 685.90 -53.2 -47.0 -51.8 82 -99 SPO 1997 10 12 07 24 82 6.3 -9 685.90 -53.2 -47.0 -51.8 82 -99 SPO 1997 10 12 07 25 81 6.4 -9 685.90 -53.2 -46.9 -51.8 82 -99 SPO 1997 10 12 07 26 80 6.5 -9 685.90 -53.0 -46.8 -51.7 82 -99 SPO 1997 10 12 07 27 80 6.5 -9 685.90 -53.0 -46.7 -51.7 80 -99 SPO 1997 10 12 07 28 81 6.4 -9 685.90 -53.0 -46.7 -51.6 80 -99 SPO 1997 10 12 07 29 82 6.3 -9 685.90 -53.0 -46.7 -51.6 80 -99 SPO 1997 10 12 07 30 82 6.2 -9 685.90 -53.0 -46.8 -51.6 80 -99 SPO 1997 10 12 07 31 83 6.0 -9 685.90 -53.0 -46.8 -51.6 80 -99 SPO 1997 10 12 07 32 84 5.9 -9 685.90 -53.0 -46.9 -51.6 82 -99 SPO 1997 10 12 07 33 85 5.7 -9 685.90 -53.2 -47.1 -51.7 84 -99 SPO 1997 10 12 07 34 86 5.7 -9 685.90 -53.2 -47.3 -51.8 84 -99 SPO 1997 10 12 07 35 86 5.6 -9 685.90 -53.4 -47.3 -51.8 86 -99 SPO 1997 10 12 07 36 87 5.7 -9 685.90 -53.5 -47.5 -52.0 87 -99 SPO 1997 10 12 07 37 87 5.7 -9 685.90 -53.5 -47.8 -51.9 87 -99 SPO 1997 10 12 07 38 86 5.7 -9 685.90 -53.5 -47.9 -51.8 87 -99 SPO 1997 10 12 07 39 86 5.7 -9 685.90 -53.4 -47.6 -51.8 86 -99 SPO 1997 10 12 07 40 86 5.6 -9 685.90 -53.2 -47.4 -51.7 82 -99 SPO 1997 10 12 07 41 85 5.6 -9 685.90 -53.2 -47.4 -51.6 82 -99 SPO 1997 10 12 07 42 84 5.5 -9 685.80 -53.0 -47.6 -51.6 80 -99 SPO 1997 10 12 07 43 83 5.5 -9 685.80 -53.0 -48.0 -51.5 82 -99 SPO 1997 10 12 07 44 82 5.4 -9 685.80 -53.0 -48.2 -51.4 -99 -99 SPO 1997 10 12 07 45 82 5.4 -9 685.80 -53.0 -48.1 -51.4 -99 -99 SPO 1997 10 12 07 46 83 5.4 -9 685.80 -53.0 -48.0 -51.4 -99 -99 SPO 1997 10 12 07 47 84 5.3 -9 685.80 -53.0 -48.1 -51.4 -99 -99 SPO 1997 10 12 07 48 85 5.2 -9 685.80 -53.2 -48.2 -51.5 -99 -99 SPO 1997 10 12 07 49 88 5.1 -9 685.80 -53.2 -48.4 -51.6 -99 -99 SPO 1997 10 12 07 50 91 4.9 -9 685.80 -53.5 -48.6 -51.8 -99 -99 SPO 1997 10 12 07 51 95 4.8 -9 685.80 -53.7 -48.8 -52.2 -99 -99 SPO 1997 10 12 07 52 96 4.8 -9 685.80 -54.0 -48.9 -52.6 -99 -99 SPO 1997 10 12 07 53 97 4.7 -9 685.80 -54.0 -48.9 -52.6 -99 -99 SPO 1997 10 12 07 54 95 4.9 -9 685.80 -54.0 -48.8 -52.4 -99 -99 SPO 1997 10 12 07 55 93 5.0 -9 685.80 -53.7 -48.8 -52.0 -99 -99 SPO 1997 10 12 07 56 92 5.1 -9 685.80 -53.5 -48.6 -51.8 -99 -99 SPO 1997 10 12 07 57 95 5.0 -9 685.80 -53.4 -48.7 -51.7 -99 -99 SPO 1997 10 12 07 58 98 4.9 -9 685.80 -53.4 -48.8 -51.9 -99 -99 SPO 1997 10 12 07 59 102 4.8 -9 685.80 -53.5 -48.9 -52.2 -99 -99 SPO 1997 10 12 08 00 104 4.8 -9 685.80 -53.7 -49.1 -52.6 -99 0 SPO 1997 10 12 08 01 102 5.0 -9 685.80 -53.7 -49.2 -52.4 -99 -99 SPO 1997 10 12 08 02 97 5.3 -9 685.80 -53.5 -49.1 -52.0 -99 -99 SPO 1997 10 12 08 03 95 5.6 -9 685.80 -53.4 -48.8 -51.8 -99 -99 SPO 1997 10 12 08 04 98 5.4 -9 685.80 -51.8 -49.0 -51.4 -99 -99 SPO 1997 10 12 08 05 104 5.6 -9 685.80 -51.6 -49.2 -51.3 -99 -99 SPO 1997 10 12 08 06 105 5.5 -9 685.80 -51.8 -49.4 -51.8 -99 -99 SPO 1997 10 12 08 07 102 5.5 -9 685.80 -53.2 -49.5 -52.1 -99 -99 SPO 1997 10 12 08 08 99 5.7 -9 685.70 -53.2 -49.5 -52.0 -99 -99 SPO 1997 10 12 08 09 97 6.0 -9 685.70 -53.2 -49.5 -51.9 -99 -99 SPO 1997 10 12 08 10 96 6.1 -9 685.70 -53.2 -49.5 -51.8 -99 -99 SPO 1997 10 12 08 11 96 5.9 -9 685.60 -53.0 -49.6 -51.8 84 -99 SPO 1997 10 12 08 12 96 6.0 -9 685.60 -53.2 -49.6 -51.9 86 -99 SPO 1997 10 12 08 13 94 6.2 -9 685.60 -53.4 -49.7 -51.9 88 -99 SPO 1997 10 12 08 14 91 6.2 -9 685.60 -53.4 -49.6 -52.0 88 -99 SPO 1997 10 12 08 15 90 6.3 -9 685.60 -53.4 -49.7 -52.0 86 -99 SPO 1997 10 12 08 16 89 6.2 -9 685.60 -53.4 -49.7 -52.0 86 -99 SPO 1997 10 12 08 17 87 6.2 -9 685.50 -53.4 -49.7 -52.0 84 -99 SPO 1997 10 12 08 18 87 6.2 -9 685.50 -53.5 -49.7 -52.1 84 -99 SPO 1997 10 12 08 19 86 6.1 -9 685.50 -53.5 -49.8 -52.2 84 -99 SPO 1997 10 12 08 20 88 6.2 -9 685.50 -53.5 -49.7 -52.2 82 -99 SPO 1997 10 12 08 21 89 6.2 -9 685.50 -53.7 -49.6 -52.3 84 -99 SPO 1997 10 12 08 22 89 6.2 -9 685.50 -53.7 -49.7 -52.4 82 -99 SPO 1997 10 12 08 23 89 6.1 -9 685.50 -54.0 -49.6 -52.5 84 -99 SPO 1997 10 12 08 24 88 6.2 -9 685.50 -54.0 -49.5 -52.6 84 -99 SPO 1997 10 12 08 25 88 6.2 -9 685.50 -54.0 -49.4 -52.6 84 -99 SPO 1997 10 12 08 26 87 6.5 -9 685.50 -54.0 -49.4 -52.6 82 -99 SPO 1997 10 12 08 27 87 6.5 -9 685.50 -54.0 -49.5 -52.6 82 -99 SPO 1997 10 12 08 28 87 6.7 -9 685.50 -53.9 -49.4 -52.6 81 -99 SPO 1997 10 12 08 29 86 6.8 -9 685.50 -53.9 -49.4 -52.6 81 -99 SPO 1997 10 12 08 30 86 7.0 -9 685.50 -53.9 -49.4 -52.6 81 -99 SPO 1997 10 12 08 31 85 7.0 -9 685.50 -53.7 -49.4 -52.5 79 -99 SPO 1997 10 12 08 32 85 7.1 -9 685.40 -53.5 -49.4 -52.5 77 -99 SPO 1997 10 12 08 33 84 7.2 -9 685.40 -53.5 -49.4 -52.4 79 -99 SPO 1997 10 12 08 34 84 7.2 -9 685.40 -53.4 -49.4 -52.3 78 -99 SPO 1997 10 12 08 35 84 7.3 -9 685.40 -53.2 -49.4 -52.3 76 -99 SPO 1997 10 12 08 36 84 7.3 -9 685.40 -53.0 -49.4 -52.2 74 -99 SPO 1997 10 12 08 37 84 7.0 -9 685.40 -53.0 -49.3 -52.1 74 -99 SPO 1997 10 12 08 38 85 6.8 -9 685.40 -53.0 -49.3 -52.0 75 -99 SPO 1997 10 12 08 39 87 6.7 -9 685.40 -53.0 -49.4 -52.0 77 -99 SPO 1997 10 12 08 40 88 6.6 -9 685.40 -53.2 -49.4 -52.1 79 -99 SPO 1997 10 12 08 41 88 6.7 -9 685.40 -53.2 -49.4 -52.1 79 -99 SPO 1997 10 12 08 42 89 6.9 -9 685.40 -53.0 -49.3 -52.1 77 -99 SPO 1997 10 12 08 43 90 7.1 -9 685.40 -53.0 -49.2 -52.0 79 -99 SPO 1997 10 12 08 44 91 7.2 -9 685.40 -53.0 -49.2 -52.0 80 -99 SPO 1997 10 12 08 45 92 7.3 -9 685.40 -53.0 -49.2 -52.0 80 -99 SPO 1997 10 12 08 46 92 7.2 -9 685.40 -53.0 -49.2 -52.0 80 -99 SPO 1997 10 12 08 47 92 7.2 -9 685.40 -53.0 -49.2 -52.0 80 -99 SPO 1997 10 12 08 48 92 7.2 -9 685.40 -53.0 -49.2 -52.0 80 -99 SPO 1997 10 12 08 49 92 7.4 -9 685.40 -52.9 -49.1 -51.9 79 -99 SPO 1997 10 12 08 50 92 7.6 -9 685.40 -52.7 -49.0 -51.9 77 -99 SPO 1997 10 12 08 51 93 7.6 -9 685.40 -52.7 -49.0 -51.9 77 -99 SPO 1997 10 12 08 52 91 7.7 -9 685.40 -52.9 -49.0 -52.0 79 -99 SPO 1997 10 12 08 53 90 7.5 -9 685.40 -52.9 -49.1 -51.9 79 -99 SPO 1997 10 12 08 54 89 7.4 -9 685.40 -52.9 -49.1 -51.9 81 -99 SPO 1997 10 12 08 55 89 7.6 -9 685.40 -52.7 -49.1 -51.9 79 -99 SPO 1997 10 12 08 56 88 7.6 -9 685.40 -52.7 -49.2 -51.8 79 -99 SPO 1997 10 12 08 57 88 7.4 -9 685.40 -52.7 -49.3 -51.8 79 -99 SPO 1997 10 12 08 58 87 7.2 -9 685.40 -52.7 -49.3 -51.7 79 -99 SPO 1997 10 12 08 59 86 7.2 -9 685.40 -52.7 -49.3 -51.8 79 -99 SPO 1997 10 12 09 00 86 7.2 -9 685.40 -52.7 -49.4 -51.8 77 0 SPO 1997 10 12 09 01 86 7.1 -9 685.40 -52.7 -49.4 -51.8 77 -99 SPO 1997 10 12 09 02 86 7.0 -9 685.40 -52.7 -49.4 -51.8 77 -99 SPO 1997 10 12 09 03 88 7.0 -9 685.40 -52.9 -49.4 -51.9 79 -99 SPO 1997 10 12 09 04 90 7.0 -9 685.40 -53.0 -49.5 -52.0 80 -99 SPO 1997 10 12 09 05 91 7.0 -9 685.40 -53.0 -49.5 -52.1 82 -99 SPO 1997 10 12 09 06 91 7.1 -9 685.40 -53.2 -49.5 -52.1 84 -99 SPO 1997 10 12 09 07 93 7.0 -9 685.40 -53.2 -49.5 -52.2 82 -99 SPO 1997 10 12 09 08 95 7.2 -9 685.40 -53.2 -49.5 -52.2 82 -99 SPO 1997 10 12 09 09 97 7.1 -9 685.40 -53.2 -49.5 -52.4 81 -99 SPO 1997 10 12 09 10 99 7.0 -9 685.40 -53.4 -49.6 -52.5 81 -99 SPO 1997 10 12 09 11 100 7.0 -9 685.40 -53.5 -49.8 -52.7 82 -99 SPO 1997 10 12 09 12 99 7.0 -9 685.40 -53.5 -49.8 -52.8 82 -99 SPO 1997 10 12 09 13 99 6.8 -9 685.40 -53.7 -49.8 -52.8 82 -99 SPO 1997 10 12 09 14 99 6.8 -9 685.40 -53.7 -49.9 -52.8 81 -99 SPO 1997 10 12 09 15 99 6.8 -9 685.40 -53.7 -50.0 -52.9 81 -99 SPO 1997 10 12 09 16 99 6.8 -9 685.40 -53.7 -50.0 -52.8 81 -99 SPO 1997 10 12 09 17 98 6.7 -9 685.40 -53.7 -50.1 -52.8 81 -99 SPO 1997 10 12 09 18 98 6.6 -9 685.40 -53.7 -50.1 -52.8 81 -99 SPO 1997 10 12 09 19 97 6.5 -9 685.40 -53.7 -50.1 -52.6 81 -99 SPO 1997 10 12 09 20 97 6.4 -9 685.40 -53.5 -50.1 -52.6 79 -99 SPO 1997 10 12 09 21 98 6.3 -9 685.40 -53.7 -50.1 -52.6 81 -99 SPO 1997 10 12 09 22 100 6.4 -9 685.40 -53.5 -50.0 -52.6 79 -99 SPO 1997 10 12 09 23 102 6.2 -9 685.40 -53.5 -49.9 -52.6 79 -99 SPO 1997 10 12 09 24 106 5.9 -9 685.40 -53.7 -50.2 -52.8 81 -99 SPO 1997 10 12 09 25 107 5.9 -9 685.50 -54.0 -50.4 -53.2 82 -99 SPO 1997 10 12 09 26 106 5.8 -9 685.40 -54.0 -50.4 -53.3 82 -99 SPO 1997 10 12 09 27 104 5.8 -9 685.40 -54.2 -50.5 -53.2 82 -99 SPO 1997 10 12 09 28 100 5.9 -9 685.40 -54.0 -50.4 -53.0 82 -99 SPO 1997 10 12 09 29 99 5.9 -9 685.40 -53.7 -50.4 -52.6 79 -99 SPO 1997 10 12 09 30 96 6.2 -9 685.30 -53.5 -50.1 -52.4 77 -99 SPO 1997 10 12 09 31 94 6.4 -9 685.30 -53.4 -49.9 -52.3 76 -99 SPO 1997 10 12 09 32 93 6.6 -9 685.30 -53.2 -49.7 -52.2 76 -99 SPO 1997 10 12 09 33 92 6.7 -9 685.30 -52.9 -49.6 -51.8 74 -99 SPO 1997 10 12 09 34 91 6.8 -9 685.20 -52.4 -49.6 -51.5 72 -99 SPO 1997 10 12 09 35 90 6.8 -9 685.20 -52.4 -49.4 -51.6 75 -99 SPO 1997 10 12 09 36 91 6.5 -9 685.20 -52.5 -49.5 -51.8 77 -99 SPO 1997 10 12 09 37 91 6.5 -9 685.20 -52.7 -49.6 -51.8 79 -99 SPO 1997 10 12 09 38 92 6.3 -9 685.20 -53.0 -49.6 -51.9 82 -99 SPO 1997 10 12 09 39 92 6.2 -9 685.30 -53.0 -49.6 -52.1 84 -99 SPO 1997 10 12 09 40 93 6.0 -9 685.30 -53.2 -49.7 -52.2 86 -99 SPO 1997 10 12 09 41 93 6.0 -9 685.30 -53.4 -49.8 -52.3 88 -99 SPO 1997 10 12 09 42 93 6.1 -9 685.30 -53.5 -49.8 -52.4 87 -99 SPO 1997 10 12 09 43 92 6.2 -9 685.30 -53.5 -49.7 -52.4 87 -99 SPO 1997 10 12 09 44 92 6.2 -9 685.20 -53.5 -49.7 -52.4 87 -99 SPO 1997 10 12 09 45 92 6.1 -9 685.20 -53.5 -49.7 -52.3 87 -99 SPO 1997 10 12 09 46 91 6.3 -9 685.20 -53.5 -49.7 -52.4 85 -99 SPO 1997 10 12 09 47 89 6.5 -9 685.20 -53.5 -49.5 -52.5 85 -99 SPO 1997 10 12 09 48 88 6.8 -9 685.20 -53.7 -49.2 -52.5 84 -99 SPO 1997 10 12 09 49 88 7.0 -9 685.20 -53.7 -49.2 -52.6 84 -99 SPO 1997 10 12 09 50 90 7.1 -9 685.20 -53.7 -49.1 -52.6 82 -99 SPO 1997 10 12 09 51 90 7.1 -9 685.20 -53.7 -49.1 -52.5 82 -99 SPO 1997 10 12 09 52 91 7.1 -9 685.30 -53.5 -49.0 -52.5 80 -99 SPO 1997 10 12 09 53 92 7.0 -9 685.30 -53.5 -49.1 -52.6 80 -99 SPO 1997 10 12 09 54 93 7.0 -9 685.30 -53.5 -49.2 -52.6 82 -99 SPO 1997 10 12 09 55 94 6.8 -9 685.30 -53.5 -49.3 -52.6 82 -99 SPO 1997 10 12 09 56 93 6.5 -9 685.30 -53.5 -49.3 -52.5 82 -99 SPO 1997 10 12 09 57 92 6.5 -9 685.30 -53.7 -49.4 -52.5 84 -99 SPO 1997 10 12 09 58 90 6.5 -9 685.30 -53.7 -49.4 -52.5 84 -99 SPO 1997 10 12 09 59 88 6.5 -9 685.30 -53.7 -49.4 -52.6 82 -99 SPO 1997 10 12 10 00 86 6.6 -9 685.20 -53.7 -49.2 -52.5 81 0 SPO 1997 10 12 10 01 85 6.8 -9 685.20 -53.7 -49.2 -52.5 81 -99 SPO 1997 10 12 10 02 85 7.0 -9 685.20 -53.7 -49.1 -52.5 79 -99 SPO 1997 10 12 10 03 84 7.0 -9 685.10 -53.5 -49.2 -52.5 77 -99 SPO 1997 10 12 10 04 84 7.0 -9 685.10 -53.5 -49.1 -52.5 77 -99 SPO 1997 10 12 10 05 84 7.0 -9 685.10 -53.5 -49.1 -52.5 79 -99 SPO 1997 10 12 10 06 85 7.0 -9 685.10 -53.5 -49.1 -52.5 79 -99 SPO 1997 10 12 10 07 86 6.9 -9 685.10 -53.5 -49.1 -52.5 77 -99 SPO 1997 10 12 10 08 89 7.0 -9 685.10 -53.7 -49.2 -52.6 79 -99 SPO 1997 10 12 10 09 91 6.9 -9 685.10 -53.7 -49.3 -52.6 79 -99 SPO 1997 10 12 10 10 91 6.7 -9 685.10 -53.9 -49.4 -52.7 81 -99 SPO 1997 10 12 10 11 93 6.6 -9 685.10 -53.9 -49.5 -52.7 81 -99 SPO 1997 10 12 10 12 94 6.5 -9 685.10 -54.0 -49.6 -52.8 82 -99 SPO 1997 10 12 10 13 96 6.4 -9 685.10 -54.0 -49.6 -52.8 82 -99 SPO 1997 10 12 10 14 98 6.2 -9 685.10 -54.0 -49.6 -52.9 80 -99 SPO 1997 10 12 10 15 100 6.2 -9 685.10 -54.2 -49.7 -53.0 82 -99 SPO 1997 10 12 10 16 100 6.2 -9 685.10 -54.4 -49.6 -53.2 83 -99 SPO 1997 10 12 10 17 101 6.3 -9 685.10 -54.4 -49.7 -53.4 83 -99 SPO 1997 10 12 10 18 102 6.3 -9 685.10 -54.5 -49.7 -53.4 85 -99 SPO 1997 10 12 10 19 101 6.4 -9 685.00 -54.5 -49.7 -53.4 84 -99 SPO 1997 10 12 10 20 100 6.5 -9 685.00 -54.5 -49.7 -53.4 84 -99 SPO 1997 10 12 10 21 99 6.4 -9 685.00 -54.4 -49.8 -53.2 83 -99 SPO 1997 10 12 10 22 100 6.5 -9 685.00 -54.4 -49.8 -53.2 83 -99 SPO 1997 10 12 10 23 100 6.7 -9 685.00 -54.2 -49.8 -53.0 81 -99 SPO 1997 10 12 10 24 103 6.8 -9 685.00 -53.9 -49.8 -52.8 78 -99 SPO 1997 10 12 10 25 104 6.8 -9 685.00 -53.5 -49.8 -52.7 75 -99 SPO 1997 10 12 10 26 104 7.0 -9 685.00 -53.5 -49.7 -52.6 77 -99 SPO 1997 10 12 10 27 104 7.2 -9 685.00 -53.2 -49.8 -52.5 74 -99 SPO 1997 10 12 10 28 103 7.2 -9 684.90 -53.2 -49.7 -52.3 76 -99 SPO 1997 10 12 10 29 103 7.3 -9 684.90 -53.0 -49.6 -52.3 75 -99 SPO 1997 10 12 10 30 102 7.2 -9 684.90 -53.0 -49.6 -52.3 77 -99 SPO 1997 10 12 10 31 100 7.2 -9 684.90 -53.0 -49.6 -52.3 80 -99 SPO 1997 10 12 10 32 99 7.2 -9 684.90 -53.0 -49.6 -52.3 80 -99 SPO 1997 10 12 10 33 98 7.3 -9 684.90 -53.0 -49.6 -52.2 82 -99 SPO 1997 10 12 10 34 96 7.3 -9 684.80 -53.0 -49.4 -52.0 82 -99 SPO 1997 10 12 10 35 97 7.2 -9 684.90 -52.7 -49.4 -51.9 81 -99 SPO 1997 10 12 10 36 99 7.2 -9 684.90 -52.9 -49.5 -52.0 83 -99 SPO 1997 10 12 10 37 101 7.1 -9 684.90 -53.0 -49.6 -52.1 84 -99 SPO 1997 10 12 10 38 102 7.2 -9 684.90 -53.0 -49.6 -52.1 82 -99 SPO 1997 10 12 10 39 103 7.1 -9 684.80 -52.9 -49.8 -52.1 81 -99 SPO 1997 10 12 10 40 103 6.9 -9 684.80 -52.9 -49.9 -52.2 81 -99 SPO 1997 10 12 10 41 103 6.9 -9 684.80 -53.0 -50.0 -52.2 82 -99 SPO 1997 10 12 10 42 101 7.0 -9 684.80 -52.9 -49.9 -52.1 83 -99 SPO 1997 10 12 10 43 100 7.0 -9 684.80 -52.7 -49.8 -52.0 81 -99 SPO 1997 10 12 10 44 99 7.2 -9 684.80 -52.7 -49.8 -51.8 81 -99 SPO 1997 10 12 10 45 98 7.1 -9 684.80 -52.7 -49.8 -51.8 81 -99 SPO 1997 10 12 10 46 97 7.2 -9 684.80 -52.7 -49.8 -51.8 81 -99 SPO 1997 10 12 10 47 95 7.1 -9 684.80 -52.5 -49.8 -51.8 79 -99 SPO 1997 10 12 10 48 95 7.1 -9 684.80 -52.5 -49.8 -51.7 79 -99 SPO 1997 10 12 10 49 96 7.3 -9 684.70 -52.5 -49.8 -51.7 79 -99 SPO 1997 10 12 10 50 96 7.3 -9 684.70 -52.5 -49.8 -51.6 79 -99 SPO 1997 10 12 10 51 96 7.3 -9 684.70 -52.5 -49.8 -51.6 79 -99 SPO 1997 10 12 10 52 96 7.3 -9 684.70 -52.4 -49.8 -51.6 78 -99 SPO 1997 10 12 10 53 97 7.2 -9 684.70 -52.4 -49.8 -51.6 78 -99 SPO 1997 10 12 10 54 96 6.8 -9 684.70 -52.4 -50.0 -51.6 79 -99 SPO 1997 10 12 10 55 96 6.7 -9 684.70 -52.4 -50.0 -51.6 81 -99 SPO 1997 10 12 10 56 95 6.7 -9 684.70 -52.5 -50.1 -51.6 82 -99 SPO 1997 10 12 10 57 93 6.6 -9 684.70 -52.5 -50.1 -51.6 82 -99 SPO 1997 10 12 10 58 92 6.4 -9 684.70 -52.5 -50.1 -51.5 82 -99 SPO 1997 10 12 10 59 91 6.4 -9 684.70 -52.5 -50.1 -51.5 82 -99 SPO 1997 10 12 11 00 89 6.1 -9 684.70 -52.5 -50.2 -51.6 82 0 SPO 1997 10 12 11 01 89 6.2 -9 684.70 -52.5 -50.2 -51.6 82 -99 SPO 1997 10 12 11 02 88 6.3 -9 684.70 -52.5 -50.2 -51.6 82 -99 SPO 1997 10 12 11 03 88 6.2 -9 684.70 -52.5 -50.2 -51.6 80 -99 SPO 1997 10 12 11 04 89 6.2 -9 684.70 -52.7 -50.2 -51.6 81 -99 SPO 1997 10 12 11 05 91 6.2 -9 684.70 -52.7 -50.1 -51.7 81 -99 SPO 1997 10 12 11 06 92 6.0 -9 684.70 -52.7 -50.2 -51.7 81 -99 SPO 1997 10 12 11 07 93 6.0 -9 684.70 -53.0 -50.2 -51.8 84 -99 SPO 1997 10 12 11 08 92 5.9 -9 684.70 -53.0 -50.2 -51.9 84 -99 SPO 1997 10 12 11 09 91 6.1 -9 684.70 -53.0 -50.2 -51.9 84 -99 SPO 1997 10 12 11 10 91 6.2 -9 684.70 -53.2 -50.2 -52.0 86 -99 SPO 1997 10 12 11 11 90 6.3 -9 684.70 -53.0 -50.1 -51.9 82 -99 SPO 1997 10 12 11 12 89 6.4 -9 684.70 -53.0 -50.1 -51.9 82 -99 SPO 1997 10 12 11 13 88 6.4 -9 684.60 -53.0 -50.0 -51.9 82 -99 SPO 1997 10 12 11 14 88 6.5 -9 684.60 -53.0 -50.0 -51.9 82 -99 SPO 1997 10 12 11 15 89 6.6 -9 684.60 -53.0 -49.9 -51.9 80 -99 SPO 1997 10 12 11 16 88 6.5 -9 684.60 -52.7 -50.0 -51.8 77 -99 SPO 1997 10 12 11 17 88 6.5 -9 684.60 -52.7 -50.1 -51.7 77 -99 SPO 1997 10 12 11 18 87 6.6 -9 684.50 -52.7 -50.1 -51.7 77 -99 SPO 1997 10 12 11 19 87 6.8 -9 684.50 -52.7 -50.1 -51.7 77 -99 SPO 1997 10 12 11 20 86 6.6 -9 684.50 -52.7 -50.1 -51.7 79 -99 SPO 1997 10 12 11 21 86 6.6 -9 684.50 -52.7 -50.1 -51.7 79 -99 SPO 1997 10 12 11 22 87 6.6 -9 684.50 -52.7 -50.2 -51.8 79 -99 SPO 1997 10 12 11 23 88 6.6 -9 684.50 -52.7 -50.2 -51.8 79 -99 SPO 1997 10 12 11 24 88 6.6 -9 684.50 -52.7 -50.1 -51.8 79 -99 SPO 1997 10 12 11 25 88 6.6 -9 684.40 -52.7 -50.0 -51.8 79 -99 SPO 1997 10 12 11 26 87 6.6 -9 684.40 -52.9 -50.0 -51.8 81 -99 SPO 1997 10 12 11 27 86 6.5 -9 684.40 -52.9 -49.9 -51.8 81 -99 SPO 1997 10 12 11 28 86 6.5 -9 684.40 -52.9 -49.9 -51.9 81 -99 SPO 1997 10 12 11 29 86 6.7 -9 684.40 -52.9 -49.8 -51.9 81 -99 SPO 1997 10 12 11 30 84 6.5 -9 684.40 -52.7 -49.7 -51.8 79 -99 SPO 1997 10 12 11 31 82 6.4 -9 684.40 -52.5 -49.6 -51.7 77 -99 SPO 1997 10 12 11 32 83 6.5 -9 684.40 -52.5 -49.7 -51.6 77 -99 SPO 1997 10 12 11 33 84 6.5 -9 684.40 -52.4 -49.7 -51.5 76 -99 SPO 1997 10 12 11 34 85 6.2 -9 684.40 -52.4 -49.7 -51.5 78 -99 SPO 1997 10 12 11 35 87 6.6 -9 684.40 -52.5 -49.6 -51.5 79 -99 SPO 1997 10 12 11 36 87 6.6 -9 684.40 -52.5 -49.5 -51.6 79 -99 SPO 1997 10 12 11 37 87 6.5 -9 684.40 -52.4 -49.5 -51.5 78 -99 SPO 1997 10 12 11 38 88 6.4 -9 684.40 -52.4 -49.6 -51.5 81 -99 SPO 1997 10 12 11 39 86 6.9 -9 684.40 -52.2 -49.6 -51.4 79 -99 SPO 1997 10 12 11 40 85 6.7 -9 684.50 -52.0 -49.5 -51.2 77 -99 SPO 1997 10 12 11 41 86 6.8 -9 684.40 -52.0 -49.5 -51.2 79 -99 SPO 1997 10 12 11 42 86 6.4 -9 684.40 -52.0 -49.4 -51.2 79 -99 SPO 1997 10 12 11 43 86 6.3 -9 684.40 -52.0 -49.5 -51.2 79 -99 SPO 1997 10 12 11 44 88 6.5 -9 684.40 -52.2 -49.6 -51.3 81 -99 SPO 1997 10 12 11 45 87 6.5 -9 684.40 -52.2 -49.6 -51.3 81 -99 SPO 1997 10 12 11 46 83 6.6 -9 684.40 -52.2 -49.6 -51.4 81 -99 SPO 1997 10 12 11 47 81 6.4 -9 684.40 -52.4 -49.6 -51.4 83 -99 SPO 1997 10 12 11 48 83 6.4 -9 684.40 -52.4 -49.6 -51.5 83 -99 SPO 1997 10 12 11 49 83 6.6 -9 684.30 -52.5 -49.6 -51.6 84 -99 SPO 1997 10 12 11 50 84 6.6 -9 684.30 -52.5 -49.6 -51.6 84 -99 SPO 1997 10 12 11 51 84 6.6 -9 684.30 -52.5 -49.6 -51.6 84 -99 SPO 1997 10 12 11 52 85 6.5 -9 684.30 -52.7 -49.7 -51.6 84 -99 SPO 1997 10 12 11 53 83 6.2 -9 684.30 -52.7 -49.7 -51.7 84 -99 SPO 1997 10 12 11 54 80 5.9 -9 684.30 -52.7 -49.7 -51.7 81 -99 SPO 1997 10 12 11 55 78 5.9 -9 684.30 -52.7 -49.9 -51.8 81 -99 SPO 1997 10 12 11 56 79 6.0 -9 684.30 -52.7 -49.9 -51.9 79 -99 SPO 1997 10 12 11 57 80 6.3 -9 684.30 -52.7 -49.9 -51.9 79 -99 SPO 1997 10 12 11 58 80 6.5 -9 684.30 -52.7 -49.8 -51.9 79 -99 SPO 1997 10 12 11 59 78 6.2 -9 684.30 -52.7 -49.8 -51.9 79 -99 SPO 1997 10 12 12 00 77 6.5 -9 684.30 -52.7 -49.8 -51.8 79 0 SPO 1997 10 12 12 01 79 6.4 -9 684.30 -52.5 -49.9 -51.7 77 -99 SPO 1997 10 12 12 02 81 7.0 -9 684.30 -52.2 -49.8 -51.4 76 -99 SPO 1997 10 12 12 03 85 7.3 -9 684.30 -52.0 -49.8 -51.4 75 -99 SPO 1997 10 12 12 04 86 7.2 -9 684.30 -52.0 -49.8 -51.3 76 -99 SPO 1997 10 12 12 05 88 7.4 -9 684.30 -52.0 -49.7 -51.3 77 -99 SPO 1997 10 12 12 06 88 7.0 -9 684.30 -52.0 -49.7 -51.2 77 -99 SPO 1997 10 12 12 07 88 7.0 -9 684.30 -52.2 -49.8 -51.4 79 -99 SPO 1997 10 12 12 08 89 6.9 -9 684.30 -52.2 -49.9 -51.5 79 -99 SPO 1997 10 12 12 09 89 7.3 -9 684.30 -52.4 -49.9 -51.6 81 -99 SPO 1997 10 12 12 10 91 7.4 -9 684.30 -52.5 -49.9 -51.7 82 -99 SPO 1997 10 12 12 11 91 7.5 -9 684.20 -52.7 -49.8 -51.8 84 -99 SPO 1997 10 12 12 12 90 7.5 -9 684.20 -52.7 -49.8 -51.9 84 -99 SPO 1997 10 12 12 13 89 7.4 -9 684.20 -52.7 -49.8 -51.9 82 -99 SPO 1997 10 12 12 14 88 7.4 -9 684.20 -52.7 -49.8 -51.9 81 -99 SPO 1997 10 12 12 15 87 7.2 -9 684.20 -52.7 -49.9 -51.8 81 -99 SPO 1997 10 12 12 16 87 7.4 -9 684.20 -52.7 -49.8 -51.8 81 -99 SPO 1997 10 12 12 17 87 7.3 -9 684.20 -52.7 -49.9 -51.9 81 -99 SPO 1997 10 12 12 18 88 7.2 -9 684.20 -52.7 -50.0 -52.0 81 -99 SPO 1997 10 12 12 19 88 7.1 -9 684.20 -52.9 -50.0 -52.0 81 -99 SPO 1997 10 12 12 20 87 6.9 -9 684.20 -53.0 -50.0 -52.1 82 -99 SPO 1997 10 12 12 21 86 6.9 -9 684.20 -53.0 -50.0 -52.2 80 -99 SPO 1997 10 12 12 22 86 6.7 -9 684.20 -53.0 -50.1 -52.2 80 -99 SPO 1997 10 12 12 23 86 6.7 -9 684.20 -53.0 -50.2 -52.2 80 -99 SPO 1997 10 12 12 24 86 6.9 -9 684.20 -53.0 -50.2 -52.2 80 -99 SPO 1997 10 12 12 25 86 7.0 -9 684.10 -53.0 -50.2 -52.2 80 -99 SPO 1997 10 12 12 26 85 7.2 -9 684.10 -53.0 -50.2 -52.2 80 -99 SPO 1997 10 12 12 27 85 7.4 -9 684.10 -53.0 -50.3 -52.2 80 -99 SPO 1997 10 12 12 28 85 7.4 -9 684.00 -53.0 -50.3 -52.2 80 -99 SPO 1997 10 12 12 29 84 7.4 -9 684.00 -53.0 -50.3 -52.2 79 -99 SPO 1997 10 12 12 30 84 7.2 -9 684.00 -53.0 -50.3 -52.3 79 -99 SPO 1997 10 12 12 31 84 7.3 -9 684.00 -53.0 -50.4 -52.3 79 -99 SPO 1997 10 12 12 32 84 7.1 -9 684.00 -53.0 -50.4 -52.3 77 -99 SPO 1997 10 12 12 33 84 7.1 -9 684.00 -53.0 -50.6 -52.4 77 -99 SPO 1997 10 12 12 34 84 7.0 -9 684.00 -53.0 -50.6 -52.4 77 -99 SPO 1997 10 12 12 35 85 7.1 -9 684.00 -53.2 -50.6 -52.5 79 -99 SPO 1997 10 12 12 36 85 6.9 -9 684.00 -53.2 -50.6 -52.5 79 -99 SPO 1997 10 12 12 37 84 6.9 -9 684.00 -53.2 -50.6 -52.6 77 -99 SPO 1997 10 12 12 38 84 6.8 -9 684.00 -53.2 -50.6 -52.6 77 -99 SPO 1997 10 12 12 39 85 6.6 -9 684.00 -53.2 -50.6 -52.5 77 -99 SPO 1997 10 12 12 40 84 6.7 -9 684.00 -53.2 -50.6 -52.6 77 -99 SPO 1997 10 12 12 41 84 6.7 -9 684.00 -53.2 -50.7 -52.6 79 -99 SPO 1997 10 12 12 42 85 6.9 -9 683.90 -53.2 -50.6 -52.6 79 -99 SPO 1997 10 12 12 43 84 6.8 -9 683.90 -53.2 -50.6 -52.6 79 -99 SPO 1997 10 12 12 44 83 6.8 -9 683.90 -53.2 -50.6 -52.7 79 -99 SPO 1997 10 12 12 45 82 6.6 -9 683.90 -53.2 -50.6 -52.7 77 -99 SPO 1997 10 12 12 46 80 6.1 -9 683.90 -53.2 -50.8 -52.7 77 -99 SPO 1997 10 12 12 47 78 6.0 -9 684.00 -53.2 -50.9 -52.8 77 -99 SPO 1997 10 12 12 48 79 5.9 -9 684.00 -53.2 -51.0 -52.8 76 -99 SPO 1997 10 12 12 49 81 6.0 -9 684.00 -53.2 -51.0 -52.8 76 -99 SPO 1997 10 12 12 50 82 5.9 -9 684.00 -53.4 -51.1 -52.8 78 -99 SPO 1997 10 12 12 51 81 5.9 -9 684.00 -53.4 -51.1 -52.8 78 -99 SPO 1997 10 12 12 52 81 6.0 -9 684.00 -53.4 -51.1 -52.8 78 -99 SPO 1997 10 12 12 53 84 6.3 -9 684.00 -53.2 -51.1 -52.8 77 -99 SPO 1997 10 12 12 54 84 6.2 -9 683.90 -53.2 -51.0 -52.8 77 -99 SPO 1997 10 12 12 55 85 6.1 -9 683.90 -53.4 -51.0 -52.8 81 -99 SPO 1997 10 12 12 56 87 6.1 -9 683.90 -53.2 -51.0 -52.8 79 -99 SPO 1997 10 12 12 57 86 6.0 -9 683.90 -53.4 -51.1 -52.9 79 -99 SPO 1997 10 12 12 58 84 5.8 -9 683.90 -53.4 -51.1 -52.9 79 -99 SPO 1997 10 12 12 59 83 5.6 -9 683.90 -53.4 -51.1 -52.9 79 -99 SPO 1997 10 12 13 00 82 5.6 -9 683.90 -53.5 -51.1 -53.0 80 0 SPO 1997 10 12 13 01 81 5.6 -9 683.90 -53.5 -51.1 -53.0 80 -99 SPO 1997 10 12 13 02 83 5.7 -9 683.90 -53.5 -51.1 -53.0 80 -99 SPO 1997 10 12 13 03 84 5.6 -9 683.90 -53.5 -51.0 -53.0 80 -99 SPO 1997 10 12 13 04 84 5.6 -9 683.90 -53.5 -51.1 -53.0 80 -99 SPO 1997 10 12 13 05 85 5.7 -9 683.90 -53.5 -51.0 -52.9 80 -99 SPO 1997 10 12 13 06 86 5.4 -9 683.80 -53.5 -51.1 -53.0 82 -99 SPO 1997 10 12 13 07 84 5.4 -9 683.80 -53.5 -51.0 -53.0 82 -99 SPO 1997 10 12 13 08 83 5.3 -9 683.80 -53.5 -51.0 -53.0 80 -99 SPO 1997 10 12 13 09 83 5.4 -9 683.80 -53.5 -51.1 -53.0 80 -99 SPO 1997 10 12 13 10 81 5.2 -9 683.80 -53.5 -51.1 -53.0 79 -99 SPO 1997 10 12 13 11 78 4.9 -9 683.80 -53.7 -51.2 -53.1 79 -99 SPO 1997 10 12 13 12 74 4.6 -9 683.80 -53.7 -51.3 -53.2 79 -99 SPO 1997 10 12 13 13 79 4.9 -9 683.90 -53.7 -51.3 -53.2 77 -99 SPO 1997 10 12 13 14 83 5.1 -9 683.80 -53.7 -51.2 -53.1 77 -99 SPO 1997 10 12 13 15 81 4.7 -9 683.80 -53.9 -51.2 -53.2 78 -99 SPO 1997 10 12 13 16 83 4.6 -9 683.80 -53.9 -51.3 -53.1 78 -99 SPO 1997 10 12 13 17 86 4.9 -9 683.80 -53.9 -51.2 -53.1 78 -99 SPO 1997 10 12 13 18 87 5.1 -9 683.80 -53.9 -51.2 -53.1 78 -99 SPO 1997 10 12 13 19 84 4.9 -9 683.80 -54.0 -51.2 -53.2 79 -99 SPO 1997 10 12 13 20 79 4.5 -9 683.80 -54.0 -51.2 -53.2 79 -99 SPO 1997 10 12 13 21 75 4.5 -9 683.80 -54.0 -51.2 -53.3 79 -99 SPO 1997 10 12 13 22 78 4.9 -9 683.80 -54.0 -51.2 -53.4 79 -99 SPO 1997 10 12 13 23 81 5.5 -9 683.70 -54.0 -51.1 -53.3 77 -99 SPO 1997 10 12 13 24 82 6.0 -9 683.70 -54.0 -51.0 -53.2 77 -99 SPO 1997 10 12 13 25 81 5.9 -9 683.60 -53.9 -51.0 -53.2 76 -99 SPO 1997 10 12 13 26 79 5.8 -9 683.60 -53.9 -51.0 -53.3 76 -99 SPO 1997 10 12 13 27 78 5.9 -9 683.60 -53.7 -51.0 -53.3 74 -99 SPO 1997 10 12 13 28 79 5.9 -9 683.60 -53.7 -51.0 -53.2 74 -99 SPO 1997 10 12 13 29 79 6.0 -9 683.60 -53.7 -51.0 -53.2 74 -99 SPO 1997 10 12 13 30 78 6.0 -9 683.60 -53.7 -51.0 -53.2 74 -99 SPO 1997 10 12 13 31 77 5.9 -9 683.60 -53.7 -51.1 -53.2 76 -99 SPO 1997 10 12 13 32 76 5.8 -9 683.60 -53.7 -51.2 -53.3 76 -99 SPO 1997 10 12 13 33 77 5.9 -9 683.60 -53.7 -51.2 -53.3 76 -99 SPO 1997 10 12 13 34 78 5.9 -9 683.60 -53.7 -51.2 -53.3 76 -99 SPO 1997 10 12 13 35 78 5.9 -9 683.50 -53.7 -51.2 -53.3 76 -99 SPO 1997 10 12 13 36 78 5.9 -9 683.50 -53.7 -51.2 -53.3 76 -99 SPO 1997 10 12 13 37 79 5.8 -9 683.50 -53.7 -51.3 -53.3 76 -99 SPO 1997 10 12 13 38 79 5.7 -9 683.50 -53.9 -51.3 -53.3 78 -99 SPO 1997 10 12 13 39 81 5.6 -9 683.50 -53.9 -51.4 -53.3 76 -99 SPO 1997 10 12 13 40 81 5.4 -9 683.50 -54.0 -51.4 -53.3 77 -99 SPO 1997 10 12 13 41 81 5.3 -9 683.50 -54.0 -51.5 -53.4 79 -99 SPO 1997 10 12 13 42 80 5.2 -9 683.60 -54.0 -51.5 -53.4 79 -99 SPO 1997 10 12 13 43 80 5.2 -9 683.60 -54.0 -51.6 -53.4 79 -99 SPO 1997 10 12 13 44 80 5.0 -9 683.60 -54.2 -51.6 -53.4 81 -99 SPO 1997 10 12 13 45 79 4.9 -9 683.60 -54.2 -51.7 -53.5 81 -99 SPO 1997 10 12 13 46 78 4.9 -9 683.60 -54.2 -51.7 -53.5 81 -99 SPO 1997 10 12 13 47 77 4.8 -9 683.60 -54.2 -51.7 -53.5 81 -99 SPO 1997 10 12 13 48 78 4.9 -9 683.50 -54.2 -51.7 -53.5 79 -99 SPO 1997 10 12 13 49 78 4.8 -9 683.50 -54.2 -51.8 -53.5 77 -99 SPO 1997 10 12 13 50 77 4.8 -9 683.50 -54.2 -51.8 -53.5 77 -99 SPO 1997 10 12 13 51 77 4.8 -9 683.50 -54.2 -51.8 -53.5 76 -99 SPO 1997 10 12 13 52 79 4.7 -9 683.50 -54.2 -51.9 -53.5 76 -99 SPO 1997 10 12 13 53 80 4.8 -9 683.50 -54.2 -51.9 -53.4 76 -99 SPO 1997 10 12 13 54 81 4.7 -9 683.50 -54.2 -52.0 -53.4 76 -99 SPO 1997 10 12 13 55 82 4.6 -9 683.50 -54.2 -52.0 -53.4 76 -99 SPO 1997 10 12 13 56 83 4.4 -9 683.50 -54.2 -52.1 -53.3 77 -99 SPO 1997 10 12 13 57 85 4.2 -9 683.50 -54.4 -52.2 -53.3 79 -99 SPO 1997 10 12 13 58 89 4.1 -9 683.60 -54.4 -52.3 -53.3 79 -99 SPO 1997 10 12 13 59 92 3.9 -9 683.50 -54.5 -52.4 -53.4 80 -99 SPO 1997 10 12 14 00 95 3.7 -9 683.60 -54.5 -52.4 -53.5 80 0 SPO 1997 10 12 14 01 98 3.7 -9 683.50 -54.5 -52.5 -53.6 79 -99 SPO 1997 10 12 14 02 101 3.6 -9 683.50 -54.5 -52.6 -53.8 79 -99 SPO 1997 10 12 14 03 102 3.7 -9 683.50 -54.7 -52.6 -53.8 81 -99 SPO 1997 10 12 14 04 102 3.7 -9 683.50 -54.7 -52.5 -53.8 79 -99 SPO 1997 10 12 14 05 100 3.7 -9 683.50 -54.7 -52.5 -53.9 79 -99 SPO 1997 10 12 14 06 99 4.0 -9 683.50 -54.7 -52.4 -53.8 79 -99 SPO 1997 10 12 14 07 98 4.2 -9 683.50 -54.7 -52.3 -53.8 79 -99 SPO 1997 10 12 14 08 97 4.3 -9 683.50 -54.7 -52.3 -53.7 79 -99 SPO 1997 10 12 14 09 95 4.7 -9 683.50 -54.7 -52.3 -53.6 79 -99 SPO 1997 10 12 14 10 93 4.8 -9 683.40 -54.7 -52.2 -53.5 79 -99 SPO 1997 10 12 14 11 89 5.0 -9 683.40 -54.7 -52.2 -53.4 79 -99 SPO 1997 10 12 14 12 87 5.1 -9 683.40 -54.7 -52.1 -53.4 79 -99 SPO 1997 10 12 14 13 85 5.4 -9 683.40 -54.5 -52.1 -53.3 77 -99 SPO 1997 10 12 14 14 83 5.6 -9 683.30 -54.4 -52.0 -53.3 76 -99 SPO 1997 10 12 14 15 81 5.8 -9 683.30 -54.2 -51.9 -53.3 72 -99 SPO 1997 10 12 14 16 81 6.0 -9 683.30 -54.2 -51.9 -53.2 74 -99 SPO 1997 10 12 14 17 80 6.0 -9 683.20 -54.0 -51.9 -53.2 72 -99 SPO 1997 10 12 14 18 80 6.0 -9 683.20 -54.0 -51.9 -53.2 72 -99 SPO 1997 10 12 14 19 80 6.0 -9 683.20 -54.0 -52.0 -53.2 72 -99 SPO 1997 10 12 14 20 80 5.9 -9 683.20 -53.9 -52.0 -53.2 73 -99 SPO 1997 10 12 14 21 79 6.0 -9 683.20 -54.0 -52.0 -53.2 74 -99 SPO 1997 10 12 14 22 79 5.8 -9 683.20 -54.0 -52.0 -53.2 74 -99 SPO 1997 10 12 14 23 79 5.9 -9 683.20 -54.0 -52.1 -53.2 74 -99 SPO 1997 10 12 14 24 78 5.8 -9 683.20 -54.0 -52.1 -53.3 74 -99 SPO 1997 10 12 14 25 79 5.8 -9 683.20 -54.0 -52.1 -53.3 74 -99 SPO 1997 10 12 14 26 78 5.6 -9 683.20 -54.0 -52.1 -53.4 74 -99 SPO 1997 10 12 14 27 79 5.6 -9 683.20 -54.0 -52.1 -53.4 74 -99 SPO 1997 10 12 14 28 79 5.6 -9 683.10 -54.0 -52.1 -53.4 72 -99 SPO 1997 10 12 14 29 80 5.6 -9 683.10 -54.2 -52.1 -53.4 74 -99 SPO 1997 10 12 14 30 81 5.7 -9 683.10 -54.2 -52.1 -53.4 74 -99 SPO 1997 10 12 14 31 82 5.6 -9 683.10 -54.2 -52.1 -53.3 74 -99 SPO 1997 10 12 14 32 84 5.7 -9 683.10 -54.2 -52.2 -53.3 74 -99 SPO 1997 10 12 14 33 84 5.5 -9 683.10 -54.2 -52.3 -53.3 74 -99 SPO 1997 10 12 14 34 84 5.5 -9 683.10 -54.2 -52.3 -53.3 74 -99 SPO 1997 10 12 14 35 85 5.3 -9 683.10 -54.2 -52.4 -53.3 74 -99 SPO 1997 10 12 14 36 87 5.3 -9 683.10 -54.4 -52.4 -53.4 76 -99 SPO 1997 10 12 14 37 88 5.2 -9 683.10 -54.4 -52.6 -53.4 76 -99 SPO 1997 10 12 14 38 90 5.4 -9 683.10 -54.4 -52.6 -53.5 76 -99 SPO 1997 10 12 14 39 91 5.2 -9 683.10 -54.5 -52.8 -53.5 77 -99 SPO 1997 10 12 14 40 91 5.2 -9 683.10 -54.5 -52.8 -53.6 75 -99 SPO 1997 10 12 14 41 92 5.2 -9 683.10 -54.7 -53.0 -53.7 76 -99 SPO 1997 10 12 14 42 91 5.2 -9 683.00 -54.7 -53.0 -53.7 76 -99 SPO 1997 10 12 14 43 90 5.3 -9 683.00 -54.7 -53.0 -53.7 76 -99 SPO 1997 10 12 14 44 89 5.6 -9 683.00 -54.7 -53.0 -53.8 76 -99 SPO 1997 10 12 14 45 88 5.7 -9 683.00 -54.7 -52.9 -53.8 74 -99 SPO 1997 10 12 14 46 87 5.8 -9 682.90 -54.7 -52.8 -53.8 74 -99 SPO 1997 10 12 14 47 86 6.0 -9 682.90 -54.7 -52.8 -53.8 74 -99 SPO 1997 10 12 14 48 85 6.3 -9 682.90 -54.5 -52.8 -53.7 72 -99 SPO 1997 10 12 14 49 85 6.2 -9 682.90 -54.5 -52.7 -53.7 72 -99 SPO 1997 10 12 14 50 83 6.3 -9 682.90 -54.5 -52.8 -53.6 72 -99 SPO 1997 10 12 14 51 83 6.3 -9 682.90 -54.4 -52.8 -53.6 72 -99 SPO 1997 10 12 14 52 83 6.3 -9 682.90 -54.2 -52.7 -53.5 72 -99 SPO 1997 10 12 14 53 82 6.2 -9 682.90 -54.2 -52.8 -53.5 72 -99 SPO 1997 10 12 14 54 82 6.1 -9 682.90 -54.2 -52.8 -53.5 72 -99 SPO 1997 10 12 14 55 81 6.2 -9 682.90 -54.2 -52.9 -53.5 72 -99 SPO 1997 10 12 14 56 82 6.2 -9 682.90 -54.2 -52.9 -53.6 72 -99 SPO 1997 10 12 14 57 82 6.1 -9 682.90 -54.2 -52.9 -53.5 72 -99 SPO 1997 10 12 14 58 83 6.2 -9 682.80 -54.2 -52.9 -53.5 72 -99 SPO 1997 10 12 14 59 83 6.3 -9 682.80 -54.2 -52.9 -53.5 72 -99 SPO 1997 10 12 15 00 83 6.3 -9 682.80 -54.2 -52.9 -53.5 72 0 SPO 1997 10 12 15 01 84 6.2 -9 682.80 -54.2 -52.8 -53.5 74 -99 SPO 1997 10 12 15 02 84 6.3 -9 682.80 -54.2 -52.9 -53.5 74 -99 SPO 1997 10 12 15 03 84 6.3 -9 682.70 -54.2 -52.9 -53.5 74 -99 SPO 1997 10 12 15 04 84 6.4 -9 682.70 -54.2 -52.9 -53.5 74 -99 SPO 1997 10 12 15 05 84 6.3 -9 682.70 -54.2 -52.9 -53.5 74 -99 SPO 1997 10 12 15 06 84 6.2 -9 682.70 -54.2 -52.9 -53.5 72 -99 SPO 1997 10 12 15 07 84 6.2 -9 682.70 -54.2 -53.0 -53.6 72 -99 SPO 1997 10 12 15 08 84 6.1 -9 682.70 -54.2 -53.0 -53.6 72 -99 SPO 1997 10 12 15 09 84 6.2 -9 682.70 -54.2 -53.1 -53.6 72 -99 SPO 1997 10 12 15 10 83 6.2 -9 682.70 -54.4 -53.1 -53.6 73 -99 SPO 1997 10 12 15 11 83 6.1 -9 682.70 -54.4 -53.1 -53.6 73 -99 SPO 1997 10 12 15 12 84 5.9 -9 682.70 -54.5 -53.2 -53.7 75 -99 SPO 1997 10 12 15 13 84 5.8 -9 682.70 -54.5 -53.2 -53.7 75 -99 SPO 1997 10 12 15 14 85 5.6 -9 682.80 -54.5 -53.2 -53.7 75 -99 SPO 1997 10 12 15 15 86 5.7 -9 682.70 -54.5 -53.2 -53.7 75 -99 SPO 1997 10 12 15 16 87 5.7 -9 682.70 -54.5 -53.2 -53.8 74 -99 SPO 1997 10 12 15 17 88 5.7 -9 682.70 -54.5 -53.2 -53.8 74 -99 SPO 1997 10 12 15 18 90 5.7 -9 682.70 -54.5 -53.1 -53.8 74 -99 SPO 1997 10 12 15 19 90 5.7 -9 682.70 -54.7 -53.2 -53.8 74 -99 SPO 1997 10 12 15 20 91 5.7 -9 682.70 -54.7 -53.2 -53.8 74 -99 SPO 1997 10 12 15 21 92 5.8 -9 682.70 -54.7 -53.2 -53.9 74 -99 SPO 1997 10 12 15 22 91 5.8 -9 682.70 -54.7 -53.1 -53.9 74 -99 SPO 1997 10 12 15 23 90 6.0 -9 682.70 -54.7 -53.1 -53.9 74 -99 SPO 1997 10 12 15 24 90 6.2 -9 682.60 -54.7 -53.0 -53.9 74 -99 SPO 1997 10 12 15 25 89 6.2 -9 682.60 -54.5 -53.0 -53.9 72 -99 SPO 1997 10 12 15 26 88 6.2 -9 682.60 -54.7 -53.1 -53.9 74 -99 SPO 1997 10 12 15 27 88 6.3 -9 682.60 -54.7 -53.1 -53.9 74 -99 SPO 1997 10 12 15 28 88 6.3 -9 682.50 -54.7 -53.1 -53.9 74 -99 SPO 1997 10 12 15 29 87 6.4 -9 682.50 -54.5 -53.2 -53.9 72 -99 SPO 1997 10 12 15 30 87 6.4 -9 682.50 -54.7 -53.2 -53.9 74 -99 SPO 1997 10 12 15 31 87 6.3 -9 682.50 -54.7 -53.2 -53.9 72 -99 SPO 1997 10 12 15 32 87 6.3 -9 682.50 -54.7 -53.2 -53.9 72 -99 SPO 1997 10 12 15 33 87 6.4 -9 682.50 -54.5 -53.2 -53.9 71 -99 SPO 1997 10 12 15 34 85 6.4 -9 682.50 -54.5 -53.2 -53.9 71 -99 SPO 1997 10 12 15 35 86 6.2 -9 682.50 -54.5 -53.3 -53.9 71 -99 SPO 1997 10 12 15 36 87 6.2 -9 682.50 -54.7 -53.2 -53.9 72 -99 SPO 1997 10 12 15 37 88 6.3 -9 682.50 -54.7 -53.2 -53.9 72 -99 SPO 1997 10 12 15 38 88 6.2 -9 682.50 -54.5 -53.2 -53.9 72 -99 SPO 1997 10 12 15 39 87 6.3 -9 682.50 -54.5 -53.2 -53.9 72 -99 SPO 1997 10 12 15 40 86 6.2 -9 682.50 -54.5 -53.3 -53.9 72 -99 SPO 1997 10 12 15 41 86 6.3 -9 682.50 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 42 86 6.3 -9 682.50 -54.5 -53.3 -53.9 72 -99 SPO 1997 10 12 15 43 86 6.2 -9 682.50 -54.5 -53.3 -53.9 71 -99 SPO 1997 10 12 15 44 85 6.3 -9 682.50 -54.5 -53.3 -53.9 71 -99 SPO 1997 10 12 15 45 84 6.3 -9 682.50 -54.5 -53.3 -53.9 71 -99 SPO 1997 10 12 15 46 84 6.3 -9 682.50 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 47 84 6.2 -9 682.50 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 48 83 6.1 -9 682.50 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 49 84 6.2 -9 682.50 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 50 84 6.1 -9 682.40 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 51 84 6.0 -9 682.40 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 52 84 6.0 -9 682.40 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 53 85 5.9 -9 682.40 -54.7 -53.3 -54.0 74 -99 SPO 1997 10 12 15 54 86 5.9 -9 682.40 -54.7 -53.3 -54.0 74 -99 SPO 1997 10 12 15 55 86 5.9 -9 682.40 -54.7 -53.3 -54.0 74 -99 SPO 1997 10 12 15 56 87 6.1 -9 682.40 -54.7 -53.3 -53.9 74 -99 SPO 1997 10 12 15 57 87 6.0 -9 682.40 -54.7 -53.3 -53.9 72 -99 SPO 1997 10 12 15 58 87 6.0 -9 682.30 -54.7 -53.3 -53.9 72 -99 SPO 1997 10 12 15 59 86 5.9 -9 682.30 -54.7 -53.3 -53.9 71 -99 SPO 1997 10 12 16 00 86 5.9 -9 682.30 -54.7 -53.4 -53.9 72 0 SPO 1997 10 12 16 01 86 6.0 -9 682.30 -54.7 -53.4 -54.0 74 -99 SPO 1997 10 12 16 02 86 6.1 -9 682.30 -54.7 -53.4 -54.0 74 -99 SPO 1997 10 12 16 03 87 6.0 -9 682.30 -54.9 -53.4 -54.0 76 -99 SPO 1997 10 12 16 04 86 5.9 -9 682.30 -54.9 -53.5 -54.1 76 -99 SPO 1997 10 12 16 05 86 5.9 -9 682.30 -55.0 -53.5 -54.1 77 -99 SPO 1997 10 12 16 06 87 5.8 -9 682.30 -55.0 -53.5 -54.1 75 -99 SPO 1997 10 12 16 07 87 5.7 -9 682.30 -54.9 -53.5 -54.1 74 -99 SPO 1997 10 12 16 08 88 5.8 -9 682.20 -54.9 -53.5 -54.1 73 -99 SPO 1997 10 12 16 09 88 5.7 -9 682.20 -54.9 -53.5 -54.0 73 -99 SPO 1997 10 12 16 10 89 5.7 -9 682.20 -55.0 -53.5 -54.1 74 -99 SPO 1997 10 12 16 11 90 5.7 -9 682.20 -54.9 -53.5 -54.1 73 -99 SPO 1997 10 12 16 12 92 5.8 -9 682.20 -54.9 -53.5 -54.1 73 -99 SPO 1997 10 12 16 13 93 5.7 -9 682.20 -54.9 -53.5 -54.1 73 -99 SPO 1997 10 12 16 14 93 5.8 -9 682.20 -54.9 -53.4 -54.1 73 -99 SPO 1997 10 12 16 15 94 5.9 -9 682.20 -54.9 -53.5 -54.1 73 -99 SPO 1997 10 12 16 16 93 6.0 -9 682.10 -55.0 -53.5 -54.2 74 -99 SPO 1997 10 12 16 17 92 6.0 -9 682.10 -55.0 -53.5 -54.2 75 -99 SPO 1997 10 12 16 18 90 6.1 -9 682.10 -55.0 -53.6 -54.3 75 -99 SPO 1997 10 12 16 19 89 6.1 -9 682.10 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 16 20 88 6.3 -9 682.10 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 16 21 87 6.3 -9 682.10 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 16 22 87 6.3 -9 682.10 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 16 23 87 6.4 -9 682.10 -55.0 -53.5 -54.3 72 -99 SPO 1997 10 12 16 24 86 6.5 -9 682.10 -55.0 -53.5 -54.3 72 -99 SPO 1997 10 12 16 25 86 6.5 -9 682.00 -55.0 -53.5 -54.3 72 -99 SPO 1997 10 12 16 26 87 6.5 -9 682.00 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 16 27 88 6.4 -9 682.00 -55.0 -53.4 -54.3 74 -99 SPO 1997 10 12 16 28 88 6.2 -9 682.00 -55.0 -53.4 -54.2 74 -99 SPO 1997 10 12 16 29 90 6.2 -9 682.00 -55.0 -53.4 -54.3 74 -99 SPO 1997 10 12 16 30 91 6.1 -9 682.10 -55.0 -53.5 -54.4 74 -99 SPO 1997 10 12 16 31 92 6.1 -9 682.10 -55.0 -53.5 -54.4 74 -99 SPO 1997 10 12 16 32 92 6.0 -9 682.10 -55.0 -53.5 -54.4 72 -99 SPO 1997 10 12 16 33 92 6.1 -9 682.10 -55.0 -53.5 -54.4 72 -99 SPO 1997 10 12 16 34 92 6.1 -9 682.10 -55.0 -53.5 -54.5 72 -99 SPO 1997 10 12 16 35 91 6.3 -9 682.00 -55.2 -53.5 -54.5 74 -99 SPO 1997 10 12 16 36 90 6.5 -9 682.00 -55.0 -53.5 -54.5 72 -99 SPO 1997 10 12 16 37 89 6.5 -9 682.00 -55.0 -53.4 -54.5 72 -99 SPO 1997 10 12 16 38 87 6.4 -9 682.00 -55.0 -53.3 -54.4 74 -99 SPO 1997 10 12 16 39 86 6.5 -9 682.00 -55.0 -53.3 -54.4 74 -99 SPO 1997 10 12 16 40 86 6.6 -9 682.00 -54.9 -53.3 -54.4 73 -99 SPO 1997 10 12 16 41 86 6.7 -9 682.00 -54.9 -53.3 -54.4 73 -99 SPO 1997 10 12 16 42 85 6.6 -9 682.00 -54.7 -53.3 -54.2 72 -99 SPO 1997 10 12 16 43 85 6.5 -9 682.00 -54.9 -53.3 -54.3 73 -99 SPO 1997 10 12 16 44 86 6.5 -9 682.00 -54.7 -53.3 -54.2 71 -99 SPO 1997 10 12 16 45 86 6.5 -9 682.00 -54.7 -53.3 -54.2 71 -99 SPO 1997 10 12 16 46 86 6.4 -9 682.00 -54.7 -53.3 -54.2 71 -99 SPO 1997 10 12 16 47 86 6.2 -9 682.00 -54.9 -53.3 -54.2 73 -99 SPO 1997 10 12 16 48 87 6.2 -9 682.00 -54.9 -53.3 -54.2 73 -99 SPO 1997 10 12 16 49 87 6.2 -9 682.00 -55.0 -53.3 -54.2 74 -99 SPO 1997 10 12 16 50 88 6.1 -9 682.00 -54.9 -53.4 -54.2 73 -99 SPO 1997 10 12 16 51 89 5.9 -9 682.00 -55.0 -53.4 -54.2 74 -99 SPO 1997 10 12 16 52 90 6.0 -9 682.00 -55.0 -53.5 -54.2 74 -99 SPO 1997 10 12 16 53 90 6.0 -9 682.00 -55.0 -53.5 -54.2 75 -99 SPO 1997 10 12 16 54 90 5.9 -9 682.00 -55.0 -53.5 -54.2 75 -99 SPO 1997 10 12 16 55 91 5.9 -9 682.00 -55.0 -53.5 -54.2 75 -99 SPO 1997 10 12 16 56 91 5.8 -9 682.00 -55.0 -53.5 -54.2 74 -99 SPO 1997 10 12 16 57 90 5.7 -9 682.00 -55.0 -53.5 -54.2 74 -99 SPO 1997 10 12 16 58 90 5.7 -9 682.00 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 16 59 89 5.9 -9 681.90 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 17 00 89 6.1 -9 681.90 -55.2 -53.5 -54.3 76 0 SPO 1997 10 12 17 01 88 6.0 -9 681.90 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 17 02 87 6.0 -9 681.90 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 17 03 86 6.0 -9 681.90 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 17 04 85 6.3 -9 681.90 -55.0 -53.5 -54.3 74 -99 SPO 1997 10 12 17 05 85 6.2 -9 681.90 -55.0 -53.5 -54.3 75 -99 SPO 1997 10 12 17 06 84 6.1 -9 681.90 -55.0 -53.5 -54.3 75 -99 SPO 1997 10 12 17 07 85 6.0 -9 681.90 -55.0 -53.5 -54.3 75 -99 SPO 1997 10 12 17 08 85 6.0 -9 681.90 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 17 09 84 6.1 -9 681.90 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 17 10 84 6.3 -9 681.90 -55.0 -53.6 -54.3 74 -99 SPO 1997 10 12 17 11 84 6.2 -9 681.80 -55.0 -53.7 -54.3 74 -99 SPO 1997 10 12 17 12 84 6.5 -9 681.80 -55.0 -53.7 -54.3 74 -99 SPO 1997 10 12 17 13 85 6.8 -9 681.80 -55.0 -53.7 -54.3 74 -99 SPO 1997 10 12 17 14 85 6.8 -9 681.80 -55.0 -53.7 -54.3 75 -99 SPO 1997 10 12 17 15 86 6.8 -9 681.80 -54.9 -53.6 -54.3 74 -99 SPO 1997 10 12 17 16 86 6.8 -9 681.80 -55.0 -53.6 -54.3 75 -99 SPO 1997 10 12 17 17 87 6.7 -9 681.80 -55.0 -53.6 -54.3 75 -99 SPO 1997 10 12 17 18 87 6.8 -9 681.80 -55.0 -53.6 -54.4 75 -99 SPO 1997 10 12 17 19 87 7.0 -9 681.80 -55.0 -53.7 -54.4 75 -99 SPO 1997 10 12 17 20 87 6.9 -9 681.80 -55.0 -53.7 -54.4 75 -99 SPO 1997 10 12 17 21 87 7.0 -9 681.80 -55.0 -53.8 -54.5 74 -99 SPO 1997 10 12 17 22 87 7.0 -9 681.80 -55.0 -53.8 -54.5 74 -99 SPO 1997 10 12 17 23 86 6.9 -9 681.80 -55.0 -53.9 -54.5 74 -99 SPO 1997 10 12 17 24 86 7.0 -9 681.80 -55.0 -53.9 -54.5 74 -99 SPO 1997 10 12 17 25 86 6.7 -9 681.70 -55.2 -53.9 -54.5 76 -99 SPO 1997 10 12 17 26 85 6.8 -9 681.70 -55.2 -53.9 -54.6 76 -99 SPO 1997 10 12 17 27 85 6.6 -9 681.70 -55.2 -54.0 -54.6 76 -99 SPO 1997 10 12 17 28 85 6.5 -9 681.70 -55.2 -54.0 -54.6 77 -99 SPO 1997 10 12 17 29 85 6.5 -9 681.70 -55.2 -54.0 -54.6 77 -99 SPO 1997 10 12 17 30 86 6.4 -9 681.70 -55.2 -54.0 -54.6 77 -99 SPO 1997 10 12 17 31 86 6.2 -9 681.80 -55.4 -54.0 -54.7 79 -99 SPO 1997 10 12 17 32 87 6.2 -9 681.80 -55.4 -54.1 -54.7 78 -99 SPO 1997 10 12 17 33 88 6.0 -9 681.80 -55.5 -54.1 -54.8 79 -99 SPO 1997 10 12 17 34 89 6.2 -9 681.80 -55.5 -54.0 -54.8 77 -99 SPO 1997 10 12 17 35 89 6.3 -9 681.80 -55.5 -54.0 -54.9 77 -99 SPO 1997 10 12 17 36 89 6.3 -9 681.80 -55.7 -54.0 -54.9 79 -99 SPO 1997 10 12 17 37 89 6.4 -9 681.80 -55.5 -54.0 -54.9 77 -99 SPO 1997 10 12 17 38 89 6.4 -9 681.70 -55.7 -53.9 -54.9 79 -99 SPO 1997 10 12 17 39 88 6.3 -9 681.70 -55.7 -54.0 -55.0 79 -99 SPO 1997 10 12 17 40 87 6.3 -9 681.70 -55.7 -54.0 -55.0 79 -99 SPO 1997 10 12 17 41 86 6.3 -9 681.70 -55.7 -54.0 -55.0 79 -99 SPO 1997 10 12 17 42 85 6.4 -9 681.70 -55.7 -54.1 -55.0 79 -99 SPO 1997 10 12 17 43 84 6.4 -9 681.60 -55.7 -54.1 -55.0 -99 -99 SPO 1997 10 12 17 44 83 6.4 -9 681.60 -55.7 -54.1 -55.0 -99 -99 SPO 1997 10 12 17 45 83 6.4 -9 681.60 -55.7 -54.1 -55.0 -99 -99 SPO 1997 10 12 17 46 83 6.5 -9 681.60 -55.7 -54.1 -55.1 -99 -99 SPO 1997 10 12 17 47 83 6.4 -9 681.60 -55.5 -54.1 -55.1 -99 -99 SPO 1997 10 12 17 48 83 6.4 -9 681.60 -55.5 -54.0 -55.0 -99 -99 SPO 1997 10 12 17 49 83 6.3 -9 681.60 -55.7 -54.0 -55.0 -99 -99 SPO 1997 10 12 17 50 83 6.4 -9 681.60 -55.7 -54.0 -55.0 -99 -99 SPO 1997 10 12 17 51 84 6.2 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 52 84 6.3 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 53 84 6.2 -9 681.60 -55.7 -53.9 -55.1 -99 -99 SPO 1997 10 12 17 54 84 6.2 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 55 85 6.2 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 56 85 6.2 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 57 86 6.2 -9 681.60 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 17 58 85 6.2 -9 681.60 -55.9 -53.9 -55.1 -99 -99 SPO 1997 10 12 17 59 83 6.2 -9 681.60 -55.9 -54.0 -55.1 -99 -99 SPO 1997 10 12 18 00 82 6.2 -9 681.60 -55.9 -54.0 -55.1 -99 0 SPO 1997 10 12 18 01 82 6.5 -9 681.60 -55.9 -54.0 -55.2 -99 -99 SPO 1997 10 12 18 02 82 6.5 -9 681.60 -55.9 -54.0 -55.2 -99 -99 SPO 1997 10 12 18 03 83 6.5 -9 681.60 -55.9 -54.1 -55.2 -99 -99 SPO 1997 10 12 18 04 82 6.3 -9 681.60 -55.9 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 05 83 6.2 -9 681.60 -55.9 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 06 83 6.0 -9 681.60 -55.9 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 07 83 6.0 -9 681.60 -55.9 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 08 84 5.9 -9 681.50 -56.0 -54.2 -55.1 -99 -99 SPO 1997 10 12 18 09 83 5.9 -9 681.50 -56.0 -54.2 -55.2 -99 -99 SPO 1997 10 12 18 10 83 5.7 -9 681.50 -56.0 -54.2 -55.2 -99 -99 SPO 1997 10 12 18 11 83 5.7 -9 681.50 -56.0 -54.2 -55.3 -99 -99 SPO 1997 10 12 18 12 83 5.9 -9 681.50 -56.2 -54.1 -55.3 -99 -99 SPO 1997 10 12 18 13 82 5.9 -9 681.50 -56.2 -54.1 -55.3 -99 -99 SPO 1997 10 12 18 14 83 6.0 -9 681.50 -56.2 -54.0 -55.3 -99 -99 SPO 1997 10 12 18 15 82 6.1 -9 681.50 -56.2 -54.0 -55.3 -99 -99 SPO 1997 10 12 18 16 81 6.2 -9 681.50 -56.0 -54.0 -55.3 -99 -99 SPO 1997 10 12 18 17 81 6.2 -9 681.50 -56.2 -54.0 -55.3 -99 -99 SPO 1997 10 12 18 18 79 6.2 -9 681.50 -56.0 -54.0 -55.3 -99 -99 SPO 1997 10 12 18 19 78 6.3 -9 681.50 -56.0 -54.0 -55.4 -99 -99 SPO 1997 10 12 18 20 79 6.4 -9 681.50 -56.0 -53.9 -55.4 -99 -99 SPO 1997 10 12 18 21 79 6.5 -9 681.50 -56.0 -53.8 -55.3 -99 -99 SPO 1997 10 12 18 22 79 6.4 -9 681.50 -56.0 -53.8 -55.2 -99 -99 SPO 1997 10 12 18 23 80 6.4 -9 681.50 -55.9 -53.8 -55.2 -99 -99 SPO 1997 10 12 18 24 81 6.4 -9 681.50 -55.9 -53.8 -55.2 -99 -99 SPO 1997 10 12 18 25 82 6.4 -9 681.50 -55.9 -53.9 -55.1 -99 -99 SPO 1997 10 12 18 26 81 6.5 -9 681.40 -55.9 -53.9 -55.2 -99 -99 SPO 1997 10 12 18 27 82 6.5 -9 681.40 -55.9 -53.9 -55.1 -99 -99 SPO 1997 10 12 18 28 82 6.4 -9 681.40 -55.7 -53.9 -55.1 -99 -99 SPO 1997 10 12 18 29 82 6.5 -9 681.40 -55.7 -53.9 -55.1 -99 -99 SPO 1997 10 12 18 30 82 6.4 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 31 82 6.5 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 32 82 6.5 -9 681.40 -55.7 -53.8 -55.0 -99 -99 SPO 1997 10 12 18 33 83 6.5 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 34 82 6.7 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 35 82 6.7 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 36 82 6.6 -9 681.40 -55.7 -53.8 -55.0 -99 -99 SPO 1997 10 12 18 37 83 6.5 -9 681.40 -55.7 -53.8 -55.0 -99 -99 SPO 1997 10 12 18 38 84 6.5 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 39 84 6.4 -9 681.40 -55.7 -53.9 -55.0 -99 -99 SPO 1997 10 12 18 40 84 6.3 -9 681.40 -55.9 -54.0 -55.0 -99 -99 SPO 1997 10 12 18 41 85 6.2 -9 681.40 -55.7 -54.0 -55.0 -99 -99 SPO 1997 10 12 18 42 86 6.2 -9 681.40 -55.9 -54.0 -55.0 -99 -99 SPO 1997 10 12 18 43 87 6.1 -9 681.40 -56.0 -54.0 -55.1 -99 -99 SPO 1997 10 12 18 44 88 6.2 -9 681.50 -56.0 -54.0 -55.2 -99 -99 SPO 1997 10 12 18 45 90 6.1 -9 681.50 -56.0 -54.0 -55.2 -99 -99 SPO 1997 10 12 18 46 91 6.2 -9 681.50 -56.0 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 47 91 6.1 -9 681.50 -55.9 -54.1 -55.1 -99 -99 SPO 1997 10 12 18 48 91 6.1 -9 681.50 -55.9 -54.2 -55.0 -99 -99 SPO 1997 10 12 18 49 91 6.0 -9 681.50 -55.9 -54.2 -55.0 74 -99 SPO 1997 10 12 18 50 90 6.1 -9 681.40 -55.9 -54.2 -55.0 74 -99 SPO 1997 10 12 18 51 89 6.2 -9 681.40 -55.7 -54.2 -55.0 72 -99 SPO 1997 10 12 18 52 88 6.3 -9 681.40 -55.9 -54.1 -55.0 76 -99 SPO 1997 10 12 18 53 87 6.4 -9 681.40 -55.9 -54.0 -55.0 76 -99 SPO 1997 10 12 18 54 87 6.5 -9 681.40 -55.9 -54.0 -55.0 76 -99 SPO 1997 10 12 18 55 87 6.5 -9 681.40 -55.9 -54.0 -55.0 76 -99 SPO 1997 10 12 18 56 88 6.4 -9 681.40 -55.9 -54.0 -55.0 74 -99 SPO 1997 10 12 18 57 88 6.3 -9 681.40 -55.9 -54.0 -55.0 73 -99 SPO 1997 10 12 18 58 88 6.4 -9 681.40 -55.9 -54.0 -55.0 73 -99 SPO 1997 10 12 18 59 87 6.3 -9 681.40 -55.9 -54.1 -55.1 73 -99 SPO 1997 10 12 19 00 87 6.2 -9 681.40 -55.9 -54.1 -55.1 73 0 SPO 1997 10 12 19 01 87 6.3 -9 681.40 -55.9 -54.0 -55.1 73 -99 SPO 1997 10 12 19 02 86 6.4 -9 681.40 -55.9 -54.0 -55.0 73 -99 SPO 1997 10 12 19 03 86 6.5 -9 681.40 -55.9 -54.0 -55.1 73 -99 SPO 1997 10 12 19 04 86 6.6 -9 681.30 -55.9 -53.9 -55.1 73 -99 SPO 1997 10 12 19 05 85 6.5 -9 681.30 -55.9 -53.8 -55.1 71 -99 SPO 1997 10 12 19 06 84 6.3 -9 681.30 -55.9 -53.8 -55.1 71 -99 SPO 1997 10 12 19 07 84 6.4 -9 681.30 -55.9 -53.8 -55.1 71 -99 SPO 1997 10 12 19 08 85 6.5 -9 681.30 -55.9 -53.8 -55.1 71 -99 SPO 1997 10 12 19 09 85 6.5 -9 681.30 -56.0 -53.8 -55.1 72 -99 SPO 1997 10 12 19 10 84 6.3 -9 681.30 -56.0 -53.9 -55.2 72 -99 SPO 1997 10 12 19 11 85 6.3 -9 681.30 -56.0 -53.9 -55.1 70 -99 SPO 1997 10 12 19 12 86 6.2 -9 681.30 -56.0 -53.9 -55.1 70 -99 SPO 1997 10 12 19 13 86 6.2 -9 681.30 -56.0 -53.9 -55.1 69 -99 SPO 1997 10 12 19 14 87 6.2 -9 681.30 -56.0 -54.0 -55.1 70 -99 SPO 1997 10 12 19 15 87 6.2 -9 681.30 -56.0 -54.0 -55.1 70 -99 SPO 1997 10 12 19 16 87 6.1 -9 681.30 -56.0 -54.0 -55.1 70 -99 SPO 1997 10 12 19 17 87 5.9 -9 681.30 -56.0 -53.9 -55.2 70 -99 SPO 1997 10 12 19 18 86 5.8 -9 681.30 -56.0 -53.9 -55.2 70 -99 SPO 1997 10 12 19 19 85 5.8 -9 681.30 -56.2 -53.8 -55.2 71 -99 SPO 1997 10 12 19 20 84 5.9 -9 681.30 -56.2 -53.8 -55.2 71 -99 SPO 1997 10 12 19 21 85 5.8 -9 681.30 -56.2 -53.8 -55.3 71 -99 SPO 1997 10 12 19 22 86 6.0 -9 681.30 -56.2 -53.8 -55.3 69 -99 SPO 1997 10 12 19 23 88 6.0 -9 681.30 -56.2 -53.8 -55.3 69 -99 SPO 1997 10 12 19 24 90 6.0 -9 681.30 -56.2 -53.8 -55.3 68 -99 SPO 1997 10 12 19 25 92 6.0 -9 681.30 -56.2 -53.9 -55.3 68 -99 SPO 1997 10 12 19 26 94 6.0 -9 681.30 -56.2 -54.0 -55.3 68 -99 SPO 1997 10 12 19 27 94 6.0 -9 681.30 -56.2 -54.0 -55.3 68 -99 SPO 1997 10 12 19 28 94 6.1 -9 681.30 -56.0 -54.0 -55.2 68 -99 SPO 1997 10 12 19 29 94 6.2 -9 681.30 -56.0 -54.0 -55.2 68 -99 SPO 1997 10 12 19 30 93 6.3 -9 681.30 -56.0 -53.9 -55.2 69 -99 SPO 1997 10 12 19 31 92 6.4 -9 681.30 -56.0 -53.9 -55.2 69 -99 SPO 1997 10 12 19 32 91 6.4 -9 681.30 -56.0 -53.9 -55.2 69 -99 SPO 1997 10 12 19 33 90 6.3 -9 681.30 -56.0 -53.9 -55.2 69 -99 SPO 1997 10 12 19 34 90 6.3 -9 681.30 -56.0 -53.9 -55.1 69 -99 SPO 1997 10 12 19 35 89 6.2 -9 681.20 -55.9 -53.8 -55.1 67 -99 SPO 1997 10 12 19 36 89 6.0 -9 681.20 -55.9 -53.9 -55.1 67 -99 SPO 1997 10 12 19 37 89 5.9 -9 681.20 -55.9 -53.9 -55.0 67 -99 SPO 1997 10 12 19 38 90 5.9 -9 681.20 -55.9 -54.0 -55.0 69 -99 SPO 1997 10 12 19 39 91 5.8 -9 681.20 -55.9 -54.0 -55.0 69 -99 SPO 1997 10 12 19 40 92 5.7 -9 681.20 -55.9 -54.0 -55.0 69 -99 SPO 1997 10 12 19 41 91 5.6 -9 681.20 -55.9 -54.0 -55.0 69 -99 SPO 1997 10 12 19 42 92 5.7 -9 681.20 -55.9 -54.0 -55.0 69 -99 SPO 1997 10 12 19 43 92 5.6 -9 681.20 -56.0 -53.9 -55.0 69 -99 SPO 1997 10 12 19 44 91 5.6 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 45 90 5.7 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 46 89 5.8 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 47 89 5.9 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 48 90 5.8 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 49 91 5.8 -9 681.20 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 12 19 50 92 5.8 -9 681.20 -56.0 -54.0 -54.9 68 -99 SPO 1997 10 12 19 51 93 5.7 -9 681.20 -56.0 -54.1 -55.0 68 -99 SPO 1997 10 12 19 52 93 5.7 -9 681.20 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 12 19 53 94 5.8 -9 681.10 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 12 19 54 95 5.8 -9 681.10 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 12 19 55 96 5.7 -9 681.10 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 12 19 56 97 5.6 -9 681.10 -56.0 -54.1 -55.0 68 -99 SPO 1997 10 12 19 57 98 5.5 -9 681.10 -55.9 -54.1 -54.9 67 -99 SPO 1997 10 12 19 58 99 5.5 -9 681.10 -56.0 -54.2 -55.0 68 -99 SPO 1997 10 12 19 59 100 5.5 -9 681.10 -56.0 -54.2 -55.0 68 -99 SPO 1997 10 12 20 00 101 5.5 -9 681.10 -55.9 -54.2 -55.0 67 0 SPO 1997 10 12 20 01 102 5.4 -9 681.10 -56.0 -54.2 -55.1 68 -99 SPO 1997 10 12 20 02 102 5.5 -9 681.10 -56.0 -54.2 -55.1 68 -99 SPO 1997 10 12 20 03 101 5.5 -9 681.10 -56.0 -54.2 -55.1 68 -99 SPO 1997 10 12 20 04 99 5.6 -9 681.10 -56.0 -54.2 -55.1 69 -99 SPO 1997 10 12 20 05 98 5.7 -9 681.10 -56.0 -54.2 -55.0 69 -99 SPO 1997 10 12 20 06 97 5.8 -9 681.10 -56.0 -54.1 -55.0 69 -99 SPO 1997 10 12 20 07 94 6.0 -9 681.10 -56.0 -54.0 -55.0 69 -99 SPO 1997 10 12 20 08 92 6.1 -9 681.00 -55.9 -53.8 -54.9 69 -99 SPO 1997 10 12 20 09 90 6.3 -9 681.00 -55.7 -53.7 -54.8 67 -99 SPO 1997 10 12 20 10 89 6.2 -9 681.00 -55.7 -53.6 -54.8 68 -99 SPO 1997 10 12 20 11 89 6.3 -9 681.00 -55.5 -53.5 -54.7 66 -99 SPO 1997 10 12 20 12 89 6.2 -9 680.90 -55.5 -53.5 -54.7 66 -99 SPO 1997 10 12 20 13 89 6.1 -9 681.00 -55.5 -53.6 -54.7 68 -99 SPO 1997 10 12 20 14 91 6.0 -9 681.00 -55.5 -53.7 -54.6 68 -99 SPO 1997 10 12 20 15 92 5.9 -9 680.80 -55.5 -53.7 -54.6 70 -99 SPO 1997 10 12 20 16 94 5.8 -9 680.80 -55.5 -53.8 -54.6 70 -99 SPO 1997 10 12 20 17 94 5.6 -9 680.90 -55.5 -53.8 -54.6 70 -99 SPO 1997 10 12 20 18 94 5.6 -9 680.80 -55.5 -53.8 -54.6 70 -99 SPO 1997 10 12 20 19 94 5.7 -9 680.80 -55.5 -53.9 -54.7 70 -99 SPO 1997 10 12 20 20 93 5.7 -9 680.80 -55.5 -53.9 -54.6 70 -99 SPO 1997 10 12 20 21 92 5.7 -9 680.80 -55.5 -53.9 -54.6 70 -99 SPO 1997 10 12 20 22 91 5.7 -9 680.80 -55.5 -54.0 -54.7 70 -99 SPO 1997 10 12 20 23 90 5.8 -9 680.80 -55.5 -53.9 -54.6 70 -99 SPO 1997 10 12 20 24 88 5.9 -9 680.80 -55.5 -53.9 -54.6 70 -99 SPO 1997 10 12 20 25 86 6.0 -9 680.80 -55.4 -53.9 -54.6 69 -99 SPO 1997 10 12 20 26 85 5.9 -9 680.70 -55.5 -53.8 -54.6 70 -99 SPO 1997 10 12 20 27 84 5.9 -9 680.80 -55.5 -53.8 -54.6 70 -99 SPO 1997 10 12 20 28 83 5.8 -9 680.80 -55.4 -53.8 -54.6 70 -99 SPO 1997 10 12 20 29 81 5.8 -9 680.80 -55.4 -53.8 -54.7 70 -99 SPO 1997 10 12 20 30 80 5.8 -9 680.70 -55.4 -53.7 -54.7 71 -99 SPO 1997 10 12 20 31 81 5.7 -9 680.70 -55.4 -53.7 -54.7 71 -99 SPO 1997 10 12 20 32 82 5.8 -9 680.70 -55.4 -53.6 -54.7 71 -99 SPO 1997 10 12 20 33 81 5.9 -9 680.70 -55.4 -53.6 -54.7 71 -99 SPO 1997 10 12 20 34 81 5.8 -9 680.70 -55.2 -53.6 -54.7 70 -99 SPO 1997 10 12 20 35 81 5.8 -9 680.70 -55.4 -53.5 -54.7 70 -99 SPO 1997 10 12 20 36 81 5.9 -9 680.80 -55.2 -53.4 -54.7 68 -99 SPO 1997 10 12 20 37 82 6.0 -9 680.80 -55.2 -53.4 -54.6 68 -99 SPO 1997 10 12 20 38 82 5.8 -9 680.80 -55.2 -53.4 -54.6 68 -99 SPO 1997 10 12 20 39 83 5.7 -9 680.80 -55.2 -53.4 -54.6 70 -99 SPO 1997 10 12 20 40 83 5.9 -9 680.80 -55.2 -53.4 -54.6 70 -99 SPO 1997 10 12 20 41 83 5.9 -9 680.80 -55.2 -53.4 -54.6 70 -99 SPO 1997 10 12 20 42 82 5.8 -9 680.80 -55.2 -53.4 -54.6 70 -99 SPO 1997 10 12 20 43 82 5.9 -9 680.80 -55.2 -53.4 -54.6 70 -99 SPO 1997 10 12 20 44 82 6.0 -9 680.80 -55.2 -53.3 -54.6 70 -99 SPO 1997 10 12 20 45 82 6.1 -9 680.80 -55.2 -53.2 -54.6 68 -99 SPO 1997 10 12 20 46 83 6.2 -9 680.70 -55.2 -53.2 -54.7 67 -99 SPO 1997 10 12 20 47 84 6.2 -9 680.70 -55.2 -53.1 -54.6 67 -99 SPO 1997 10 12 20 48 84 6.2 -9 680.70 -55.2 -53.1 -54.6 67 -99 SPO 1997 10 12 20 49 84 6.2 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 50 83 6.2 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 51 83 6.2 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 52 83 6.3 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 53 83 6.3 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 54 83 6.3 -9 680.70 -55.2 -53.1 -54.6 68 -99 SPO 1997 10 12 20 55 83 6.3 -9 680.70 -55.0 -53.1 -54.6 68 -99 SPO 1997 10 12 20 56 83 6.2 -9 680.60 -55.2 -53.2 -54.6 70 -99 SPO 1997 10 12 20 57 83 6.3 -9 680.60 -55.2 -53.2 -54.6 68 -99 SPO 1997 10 12 20 58 84 6.2 -9 680.70 -55.2 -53.2 -54.6 67 -99 SPO 1997 10 12 20 59 84 6.4 -9 680.70 -55.0 -53.1 -54.6 66 -99 SPO 1997 10 12 21 00 85 6.5 -9 680.60 -55.0 -53.2 -54.5 66 0 SPO 1997 10 12 21 01 86 6.5 -9 680.60 -55.0 -53.2 -54.5 66 -99 SPO 1997 10 12 21 02 86 6.6 -9 680.60 -55.0 -53.2 -54.5 66 -99 SPO 1997 10 12 21 03 85 6.5 -9 680.60 -55.0 -53.2 -54.6 66 -99 SPO 1997 10 12 21 04 85 6.4 -9 680.60 -55.0 -53.2 -54.6 66 -99 SPO 1997 10 12 21 05 85 6.4 -9 680.60 -55.0 -53.3 -54.6 66 -99 SPO 1997 10 12 21 06 84 6.3 -9 680.60 -55.2 -53.3 -54.7 68 -99 SPO 1997 10 12 21 07 84 6.3 -9 680.60 -55.2 -53.3 -54.7 68 -99 SPO 1997 10 12 21 08 84 6.5 -9 680.50 -55.2 -53.3 -54.7 68 -99 SPO 1997 10 12 21 09 83 6.4 -9 680.50 -55.2 -53.4 -54.7 67 -99 SPO 1997 10 12 21 10 83 6.4 -9 680.50 -55.2 -53.4 -54.7 67 -99 SPO 1997 10 12 21 11 83 6.4 -9 680.50 -55.2 -53.4 -54.7 67 -99 SPO 1997 10 12 21 12 84 6.5 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 13 84 6.3 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 14 83 6.2 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 15 83 6.1 -9 680.60 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 16 83 6.0 -9 680.60 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 17 84 6.0 -9 680.50 -55.2 -53.4 -54.7 66 -99 SPO 1997 10 12 21 18 84 6.0 -9 680.50 -55.2 -53.4 -54.7 66 -99 SPO 1997 10 12 21 19 84 5.8 -9 680.50 -55.2 -53.4 -54.7 66 -99 SPO 1997 10 12 21 20 84 5.8 -9 680.50 -55.2 -53.4 -54.7 66 -99 SPO 1997 10 12 21 21 84 5.7 -9 680.50 -55.2 -53.5 -54.7 66 -99 SPO 1997 10 12 21 22 84 5.8 -9 680.60 -55.2 -53.5 -54.7 66 -99 SPO 1997 10 12 21 23 85 5.7 -9 680.60 -55.2 -53.4 -54.7 66 -99 SPO 1997 10 12 21 24 85 5.6 -9 680.60 -55.0 -53.5 -54.7 64 -99 SPO 1997 10 12 21 25 84 5.6 -9 680.60 -55.0 -53.5 -54.7 64 -99 SPO 1997 10 12 21 26 85 5.7 -9 680.60 -55.0 -53.5 -54.7 64 -99 SPO 1997 10 12 21 27 85 5.6 -9 680.60 -55.2 -53.4 -54.6 66 -99 SPO 1997 10 12 21 28 85 5.6 -9 680.50 -55.2 -53.3 -54.7 66 -99 SPO 1997 10 12 21 29 84 5.6 -9 680.50 -55.2 -53.4 -54.7 67 -99 SPO 1997 10 12 21 30 83 5.7 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 31 82 5.7 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 32 81 5.7 -9 680.50 -55.2 -53.4 -54.8 67 -99 SPO 1997 10 12 21 33 80 5.8 -9 680.50 -55.2 -53.3 -54.8 67 -99 SPO 1997 10 12 21 34 80 6.0 -9 680.50 -55.2 -53.2 -54.8 67 -99 SPO 1997 10 12 21 35 79 6.1 -9 680.50 -55.2 -53.2 -54.8 67 -99 SPO 1997 10 12 21 36 79 6.1 -9 680.50 -55.0 -53.2 -54.8 66 -99 SPO 1997 10 12 21 37 80 5.9 -9 680.50 -55.0 -53.2 -54.7 66 -99 SPO 1997 10 12 21 38 81 6.1 -9 680.40 -55.0 -53.1 -54.7 66 -99 SPO 1997 10 12 21 39 82 6.0 -9 680.50 -55.0 -53.1 -54.7 66 -99 SPO 1997 10 12 21 40 82 6.0 -9 680.50 -55.0 -53.1 -54.6 66 -99 SPO 1997 10 12 21 41 83 5.8 -9 680.50 -55.0 -53.1 -54.5 66 -99 SPO 1997 10 12 21 42 84 5.7 -9 680.50 -55.0 -53.2 -54.4 66 -99 SPO 1997 10 12 21 43 84 5.6 -9 680.50 -55.0 -53.2 -54.4 66 -99 SPO 1997 10 12 21 44 84 5.7 -9 680.40 -55.0 -53.2 -54.5 66 -99 SPO 1997 10 12 21 45 84 5.6 -9 680.40 -55.0 -53.1 -54.5 66 -99 SPO 1997 10 12 21 46 83 5.5 -9 680.40 -55.0 -53.2 -54.5 66 -99 SPO 1997 10 12 21 47 82 5.6 -9 680.40 -55.0 -53.2 -54.6 66 -99 SPO 1997 10 12 21 48 81 5.7 -9 680.40 -55.0 -53.2 -54.6 66 -99 SPO 1997 10 12 21 49 80 5.6 -9 680.40 -55.0 -53.1 -54.6 66 -99 SPO 1997 10 12 21 50 80 5.5 -9 680.40 -55.0 -53.0 -54.6 66 -99 SPO 1997 10 12 21 51 80 5.7 -9 680.40 -55.0 -52.8 -54.6 66 -99 SPO 1997 10 12 21 52 80 5.7 -9 680.40 -55.0 -52.8 -54.6 68 -99 SPO 1997 10 12 21 53 80 5.8 -9 680.40 -55.0 -52.8 -54.6 68 -99 SPO 1997 10 12 21 54 80 5.8 -9 680.40 -54.7 -52.9 -54.6 66 -99 SPO 1997 10 12 21 55 81 5.8 -9 680.40 -54.7 -52.9 -54.5 66 -99 SPO 1997 10 12 21 56 81 5.8 -9 680.40 -54.7 -52.8 -54.4 67 -99 SPO 1997 10 12 21 57 81 5.8 -9 680.40 -54.7 -52.8 -54.2 67 -99 SPO 1997 10 12 21 58 80 5.9 -9 680.40 -54.7 -52.7 -54.2 66 -99 SPO 1997 10 12 21 59 80 6.0 -9 680.30 -54.7 -52.7 -54.2 66 -99 SPO 1997 10 12 22 00 81 6.0 -9 680.30 -54.7 -52.8 -54.2 66 0 SPO 1997 10 12 22 01 80 6.1 -9 680.30 -54.7 -52.7 -54.2 66 -99 SPO 1997 10 12 22 02 80 6.2 -9 680.30 -54.7 -52.7 -54.1 66 -99 SPO 1997 10 12 22 03 80 6.2 -9 680.30 -54.7 -52.7 -54.1 66 -99 SPO 1997 10 12 22 04 80 6.2 -9 680.30 -54.7 -52.6 -54.1 66 -99 SPO 1997 10 12 22 05 79 6.2 -9 680.30 -54.7 -52.5 -54.1 66 -99 SPO 1997 10 12 22 06 79 6.2 -9 680.30 -54.7 -52.5 -54.1 67 -99 SPO 1997 10 12 22 07 80 6.1 -9 680.30 -54.7 -52.5 -54.0 67 -99 SPO 1997 10 12 22 08 81 6.0 -9 680.30 -54.7 -52.6 -53.9 67 -99 SPO 1997 10 12 22 09 82 5.9 -9 680.30 -54.5 -52.6 -53.9 66 -99 SPO 1997 10 12 22 10 83 5.8 -9 680.30 -54.7 -52.6 -53.9 67 -99 SPO 1997 10 12 22 11 84 5.7 -9 680.30 -54.7 -52.7 -53.8 67 -99 SPO 1997 10 12 22 12 86 5.7 -9 680.30 -54.5 -52.7 -53.8 64 -99 SPO 1997 10 12 22 13 86 5.7 -9 680.30 -54.7 -52.7 -53.8 66 -99 SPO 1997 10 12 22 14 86 5.8 -9 680.30 -54.7 -52.7 -53.8 66 -99 SPO 1997 10 12 22 15 85 5.8 -9 680.30 -54.5 -52.7 -53.8 63 -99 SPO 1997 10 12 22 16 85 5.8 -9 680.30 -54.5 -52.7 -53.7 64 -99 SPO 1997 10 12 22 17 84 5.9 -9 680.30 -54.5 -52.8 -53.7 64 -99 SPO 1997 10 12 22 18 84 5.9 -9 680.30 -54.5 -52.7 -53.7 66 -99 SPO 1997 10 12 22 19 84 6.1 -9 680.20 -54.5 -52.7 -53.7 66 -99 SPO 1997 10 12 22 20 83 6.1 -9 680.20 -54.5 -52.7 -53.7 66 -99 SPO 1997 10 12 22 21 82 6.0 -9 680.20 -54.5 -52.6 -53.7 66 -99 SPO 1997 10 12 22 22 82 5.8 -9 680.20 -54.5 -52.6 -53.7 66 -99 SPO 1997 10 12 22 23 82 5.9 -9 680.20 -54.5 -52.6 -53.7 64 -99 SPO 1997 10 12 22 24 82 5.8 -9 680.20 -54.5 -52.6 -53.7 64 -99 SPO 1997 10 12 22 25 83 5.8 -9 680.30 -54.5 -52.5 -53.7 64 -99 SPO 1997 10 12 22 26 83 5.8 -9 680.30 -54.7 -52.5 -53.7 66 -99 SPO 1997 10 12 22 27 84 5.8 -9 680.30 -54.7 -52.4 -53.7 66 -99 SPO 1997 10 12 22 28 85 5.9 -9 680.30 -54.5 -52.4 -53.6 64 -99 SPO 1997 10 12 22 29 85 6.0 -9 680.30 -54.5 -52.4 -53.6 64 -99 SPO 1997 10 12 22 30 86 6.0 -9 680.30 -54.5 -52.4 -53.6 66 -99 SPO 1997 10 12 22 31 87 5.8 -9 680.30 -54.5 -52.4 -53.5 66 -99 SPO 1997 10 12 22 32 87 5.8 -9 680.30 -54.5 -52.5 -53.5 66 -99 SPO 1997 10 12 22 33 86 5.8 -9 680.30 -54.5 -52.6 -53.5 66 -99 SPO 1997 10 12 22 34 86 5.7 -9 680.30 -54.5 -52.5 -53.5 66 -99 SPO 1997 10 12 22 35 85 5.8 -9 680.30 -54.5 -52.5 -53.6 66 -99 SPO 1997 10 12 22 36 84 5.8 -9 680.30 -54.5 -52.4 -53.8 66 -99 SPO 1997 10 12 22 37 84 5.9 -9 680.30 -54.5 -52.4 -53.9 66 -99 SPO 1997 10 12 22 38 83 6.0 -9 680.30 -54.5 -52.4 -54.0 66 -99 SPO 1997 10 12 22 39 83 6.0 -9 680.30 -54.5 -52.4 -54.0 66 -99 SPO 1997 10 12 22 40 83 6.1 -9 680.30 -54.4 -52.3 -54.0 66 -99 SPO 1997 10 12 22 41 83 6.1 -9 680.30 -54.4 -52.3 -54.0 66 -99 SPO 1997 10 12 22 42 83 6.0 -9 680.20 -54.4 -52.2 -54.0 67 -99 SPO 1997 10 12 22 43 83 6.0 -9 680.20 -54.4 -52.2 -53.8 67 -99 SPO 1997 10 12 22 44 82 6.0 -9 680.20 -54.4 -52.2 -53.6 67 -99 SPO 1997 10 12 22 45 83 5.9 -9 680.20 -54.4 -52.1 -53.6 67 -99 SPO 1997 10 12 22 46 83 5.9 -9 680.10 -54.4 -52.0 -53.5 67 -99 SPO 1997 10 12 22 47 83 5.9 -9 680.10 -54.2 -52.0 -53.5 66 -99 SPO 1997 10 12 22 48 83 5.9 -9 680.10 -54.2 -52.0 -53.5 66 -99 SPO 1997 10 12 22 49 83 5.9 -9 680.10 -54.4 -52.0 -53.5 67 -99 SPO 1997 10 12 22 50 82 6.0 -9 680.10 -54.4 -52.0 -53.5 67 -99 SPO 1997 10 12 22 51 81 6.0 -9 680.10 -54.4 -52.0 -53.5 67 -99 SPO 1997 10 12 22 52 79 6.1 -9 680.10 -54.4 -52.0 -53.5 67 -99 SPO 1997 10 12 22 53 79 6.2 -9 680.10 -54.2 -52.0 -53.5 66 -99 SPO 1997 10 12 22 54 79 6.3 -9 680.10 -54.2 -51.9 -53.5 66 -99 SPO 1997 10 12 22 55 78 6.3 -9 680.10 -54.2 -51.9 -53.5 67 -99 SPO 1997 10 12 22 56 78 6.5 -9 680.10 -54.2 -52.0 -53.5 67 -99 SPO 1997 10 12 22 57 78 6.3 -9 680.10 -54.0 -52.0 -53.6 66 -99 SPO 1997 10 12 22 58 78 6.2 -9 680.10 -54.0 -52.1 -53.7 67 -99 SPO 1997 10 12 22 59 78 6.3 -9 680.10 -54.0 -52.2 -53.8 67 -99 SPO 1997 10 12 23 00 78 6.2 -9 680.10 -54.0 -52.2 -53.8 66 0 SPO 1997 10 12 23 01 78 6.1 -9 680.10 -54.2 -52.2 -53.9 67 -99 SPO 1997 10 12 23 02 78 6.0 -9 680.10 -54.2 -52.2 -53.9 67 -99 SPO 1997 10 12 23 03 78 6.0 -9 680.20 -54.2 -52.2 -54.0 66 -99 SPO 1997 10 12 23 04 79 6.1 -9 680.20 -54.4 -52.1 -54.0 67 -99 SPO 1997 10 12 23 05 79 6.0 -9 680.20 -54.4 -52.1 -54.0 67 -99 SPO 1997 10 12 23 06 78 6.0 -9 680.20 -54.4 -52.1 -54.0 67 -99 SPO 1997 10 12 23 07 79 5.9 -9 680.20 -54.4 -52.1 -54.1 69 -99 SPO 1997 10 12 23 08 79 6.0 -9 680.20 -54.4 -52.1 -54.2 69 -99 SPO 1997 10 12 23 09 78 6.1 -9 680.20 -54.5 -52.0 -54.2 68 -99 SPO 1997 10 12 23 10 78 6.1 -9 680.20 -54.5 -52.0 -54.2 68 -99 SPO 1997 10 12 23 11 78 6.3 -9 680.20 -54.5 -52.0 -54.0 68 -99 SPO 1997 10 12 23 12 78 6.3 -9 680.20 -54.4 -52.0 -53.8 67 -99 SPO 1997 10 12 23 13 79 6.3 -9 680.20 -54.4 -52.0 -53.8 66 -99 SPO 1997 10 12 23 14 78 6.3 -9 680.20 -54.4 -52.1 -53.8 66 -99 SPO 1997 10 12 23 15 78 6.4 -9 680.20 -54.4 -52.1 -53.8 65 -99 SPO 1997 10 12 23 16 78 6.4 -9 680.20 -54.4 -52.1 -53.8 65 -99 SPO 1997 10 12 23 17 78 6.3 -9 680.20 -54.4 -52.1 -53.7 66 -99 SPO 1997 10 12 23 18 79 6.3 -9 680.20 -54.4 -52.0 -53.8 67 -99 SPO 1997 10 12 23 19 78 6.2 -9 680.20 -54.4 -51.9 -53.8 67 -99 SPO 1997 10 12 23 20 78 6.3 -9 680.20 -54.2 -51.8 -53.7 66 -99 SPO 1997 10 12 23 21 78 6.3 -9 680.20 -54.4 -51.7 -53.7 67 -99 SPO 1997 10 12 23 22 78 6.2 -9 680.20 -54.4 -51.7 -53.7 67 -99 SPO 1997 10 12 23 23 78 6.3 -9 680.20 -54.4 -51.7 -53.7 67 -99 SPO 1997 10 12 23 24 77 6.2 -9 680.20 -54.4 -51.7 -53.7 67 -99 SPO 1997 10 12 23 25 77 6.3 -9 680.20 -54.4 -51.6 -53.7 66 -99 SPO 1997 10 12 23 26 77 6.2 -9 680.20 -54.4 -51.4 -53.7 66 -99 SPO 1997 10 12 23 27 78 6.3 -9 680.20 -54.4 -51.4 -53.7 65 -99 SPO 1997 10 12 23 28 78 6.2 -9 680.20 -54.4 -51.2 -53.7 65 -99 SPO 1997 10 12 23 29 78 6.2 -9 680.20 -54.2 -51.1 -53.7 63 -99 SPO 1997 10 12 23 30 79 6.2 -9 680.20 -54.4 -51.1 -53.9 66 -99 SPO 1997 10 12 23 31 79 6.0 -9 680.20 -54.4 -51.2 -54.0 66 -99 SPO 1997 10 12 23 32 80 6.0 -9 680.20 -54.4 -51.4 -54.0 66 -99 SPO 1997 10 12 23 33 80 6.0 -9 680.20 -54.4 -51.4 -53.9 66 -99 SPO 1997 10 12 23 34 81 6.1 -9 680.20 -54.4 -51.3 -53.8 66 -99 SPO 1997 10 12 23 35 81 6.2 -9 680.20 -54.5 -51.1 -53.7 66 -99 SPO 1997 10 12 23 36 80 6.1 -9 680.20 -54.4 -51.0 -53.6 66 -99 SPO 1997 10 12 23 37 81 6.0 -9 680.20 -54.2 -50.8 -53.6 64 -99 SPO 1997 10 12 23 38 81 6.2 -9 680.20 -54.2 -50.6 -53.6 64 -99 SPO 1997 10 12 23 39 82 6.1 -9 680.20 -54.2 -50.5 -53.6 64 -99 SPO 1997 10 12 23 40 83 5.9 -9 680.20 -54.4 -50.7 -53.6 66 -99 SPO 1997 10 12 23 41 83 5.9 -9 680.20 -54.5 -50.8 -53.5 66 -99 SPO 1997 10 12 23 42 83 5.9 -9 680.20 -54.5 -50.7 -53.6 66 -99 SPO 1997 10 12 23 43 83 5.9 -9 680.20 -54.5 -50.8 -53.7 66 -99 SPO 1997 10 12 23 44 82 5.8 -9 680.20 -54.5 -51.0 -53.8 66 -99 SPO 1997 10 12 23 45 82 6.0 -9 680.20 -54.5 -50.9 -53.6 66 -99 SPO 1997 10 12 23 46 82 6.0 -9 680.20 -54.5 -50.8 -53.6 66 -99 SPO 1997 10 12 23 47 83 6.2 -9 680.20 -54.4 -50.7 -53.5 66 -99 SPO 1997 10 12 23 48 84 6.2 -9 680.20 -54.4 -50.7 -53.5 66 -99 SPO 1997 10 12 23 49 83 6.1 -9 680.20 -54.4 -50.9 -53.6 66 -99 SPO 1997 10 12 23 50 82 6.3 -9 680.10 -54.5 -51.2 -53.6 66 -99 SPO 1997 10 12 23 51 81 6.4 -9 680.10 -54.5 -51.2 -53.6 66 -99 SPO 1997 10 12 23 52 80 6.5 -9 680.10 -54.5 -51.0 -53.6 66 -99 SPO 1997 10 12 23 53 80 6.4 -9 680.10 -54.4 -50.9 -53.5 67 -99 SPO 1997 10 12 23 54 80 6.5 -9 680.10 -54.2 -50.9 -53.5 66 -99 SPO 1997 10 12 23 55 80 6.5 -9 680.10 -54.4 -50.9 -53.6 67 -99 SPO 1997 10 12 23 56 80 6.4 -9 680.10 -54.4 -51.0 -53.5 67 -99 SPO 1997 10 12 23 57 79 6.2 -9 680.10 -54.4 -51.0 -53.5 67 -99 SPO 1997 10 12 23 58 81 6.1 -9 680.10 -54.4 -51.2 -53.5 -99 -99 SPO 1997 10 12 23 59 81 6.0 -9 680.10 -54.5 -51.3 -53.6 -99 -99 SPO 1997 10 13 00 00 81 6.0 -9 680.10 -54.6 -51.4 -53.6 -99 0 SPO 1997 10 13 00 01 81 6.0 -9 680.10 -54.6 -51.4 -53.6 -99 -99 SPO 1997 10 13 00 02 81 5.9 -9 680.10 -54.6 -51.5 -53.6 -99 -99 SPO 1997 10 13 00 03 82 5.9 -9 680.10 -54.7 -51.6 -53.6 66 -99 SPO 1997 10 13 00 04 83 5.9 -9 680.10 -54.7 -51.6 -53.6 66 -99 SPO 1997 10 13 00 05 83 6.0 -9 680.10 -54.7 -51.7 -53.6 65 -99 SPO 1997 10 13 00 06 84 6.1 -9 680.10 -54.8 -51.7 -53.7 66 -99 SPO 1997 10 13 00 07 83 6.2 -9 680.10 -54.8 -51.7 -53.7 66 -99 SPO 1997 10 13 00 08 81 6.0 -9 680.10 -54.8 -51.6 -53.8 66 -99 SPO 1997 10 13 00 09 81 6.0 -9 680.10 -54.8 -51.6 -53.8 66 -99 SPO 1997 10 13 00 10 80 6.0 -9 680.10 -54.7 -51.4 -53.9 65 -99 SPO 1997 10 13 00 11 79 6.0 -9 680.10 -54.8 -51.4 -54.0 66 -99 SPO 1997 10 13 00 12 78 5.9 -9 680.10 -54.8 -51.3 -54.1 66 -99 SPO 1997 10 13 00 13 77 5.9 -9 680.10 -54.8 -51.4 -54.2 66 -99 SPO 1997 10 13 00 14 77 6.1 -9 680.10 -54.8 -51.4 -54.0 66 -99 SPO 1997 10 13 00 15 77 6.1 -9 680.10 -54.8 -51.2 -54.0 66 -99 SPO 1997 10 13 00 16 75 6.0 -9 680.10 -54.8 -51.1 -53.9 65 -99 SPO 1997 10 13 00 17 75 5.7 -9 680.10 -54.8 -51.2 -53.8 65 -99 SPO 1997 10 13 00 18 76 5.8 -9 680.10 -54.8 -51.2 -53.8 65 -99 SPO 1997 10 13 00 19 78 5.9 -9 680.10 -54.7 -51.2 -53.6 64 -99 SPO 1997 10 13 00 20 79 6.1 -9 680.10 -54.6 -51.1 -53.6 64 -99 SPO 1997 10 13 00 21 78 5.8 -9 680.10 -54.6 -51.2 -53.5 66 -99 SPO 1997 10 13 00 22 78 5.7 -9 680.10 -54.5 -51.3 -53.5 65 -99 SPO 1997 10 13 00 23 80 5.8 -9 680.10 -54.5 -51.3 -53.5 66 -99 SPO 1997 10 13 00 24 80 5.8 -9 680.10 -54.4 -51.3 -53.4 67 -99 SPO 1997 10 13 00 25 80 5.8 -9 680.10 -54.4 -51.3 -53.4 67 -99 SPO 1997 10 13 00 26 80 5.8 -9 680.10 -54.3 -51.3 -53.3 67 -99 SPO 1997 10 13 00 27 79 5.9 -9 680.00 -54.2 -51.3 -53.3 66 -99 SPO 1997 10 13 00 28 78 5.8 -9 680.00 -54.2 -51.3 -53.3 66 -99 SPO 1997 10 13 00 29 77 5.8 -9 680.00 -54.2 -51.4 -53.3 65 -99 SPO 1997 10 13 00 30 77 5.9 -9 680.00 -54.2 -51.4 -53.3 65 -99 SPO 1997 10 13 00 31 76 6.0 -9 680.00 -54.1 -51.4 -53.3 65 -99 SPO 1997 10 13 00 32 75 6.1 -9 680.00 -54.1 -51.3 -53.3 65 -99 SPO 1997 10 13 00 33 75 6.1 -9 680.00 -54.0 -51.2 -53.3 65 -99 SPO 1997 10 13 00 34 74 6.1 -9 680.00 -54.0 -51.2 -53.4 66 -99 SPO 1997 10 13 00 35 74 6.2 -9 680.00 -54.0 -51.1 -53.6 67 -99 SPO 1997 10 13 00 36 75 6.3 -9 679.90 -54.0 -51.1 -53.6 67 -99 SPO 1997 10 13 00 37 74 6.3 -9 679.90 -53.9 -51.1 -53.4 66 -99 SPO 1997 10 13 00 38 74 6.2 -9 679.90 -53.8 -51.1 -53.3 66 -99 SPO 1997 10 13 00 39 74 6.2 -9 679.90 -53.8 -51.1 -53.4 66 -99 SPO 1997 10 13 00 40 74 6.2 -9 679.90 -53.8 -51.0 -53.6 66 -99 SPO 1997 10 13 00 41 75 6.1 -9 679.90 -53.8 -51.0 -53.7 66 -99 SPO 1997 10 13 00 42 76 6.0 -9 679.90 -53.9 -50.9 -53.7 67 -99 SPO 1997 10 13 00 43 75 5.9 -9 679.90 -53.9 -50.9 -53.6 67 -99 SPO 1997 10 13 00 44 75 5.9 -9 679.90 -53.9 -50.9 -53.5 67 -99 SPO 1997 10 13 00 45 75 5.8 -9 679.90 -53.9 -50.9 -53.3 67 -99 SPO 1997 10 13 00 46 75 5.8 -9 679.90 -53.9 -50.9 -53.3 66 -99 SPO 1997 10 13 00 47 75 5.8 -9 679.90 -53.9 -50.8 -53.2 67 -99 SPO 1997 10 13 00 48 73 5.8 -9 679.90 -53.8 -50.8 -53.2 66 -99 SPO 1997 10 13 00 49 72 5.8 -9 679.90 -53.8 -50.7 -53.2 66 -99 SPO 1997 10 13 00 50 72 5.8 -9 679.90 -53.8 -50.6 -53.2 66 -99 SPO 1997 10 13 00 51 72 5.9 -9 679.90 -53.8 -50.6 -53.2 66 -99 SPO 1997 10 13 00 52 72 5.9 -9 679.90 -53.8 -50.5 -53.1 66 -99 SPO 1997 10 13 00 53 73 6.0 -9 679.90 -53.8 -50.6 -53.1 66 -99 SPO 1997 10 13 00 54 73 6.0 -9 679.90 -53.8 -50.4 -53.1 65 -99 SPO 1997 10 13 00 55 74 6.0 -9 679.90 -53.8 -50.4 -53.0 66 -99 SPO 1997 10 13 00 56 73 6.0 -9 679.90 -53.7 -50.4 -53.0 64 -99 SPO 1997 10 13 00 57 73 6.0 -9 679.90 -53.8 -50.4 -53.0 66 -99 SPO 1997 10 13 00 58 74 6.0 -9 679.90 -53.8 -50.4 -53.0 66 -99 SPO 1997 10 13 00 59 75 6.0 -9 679.90 -53.7 -50.3 -53.0 66 -99 SPO 1997 10 13 01 00 74 6.0 -9 679.90 -53.8 -50.3 -53.0 67 0 SPO 1997 10 13 01 01 74 6.2 -9 679.90 -53.8 -50.3 -53.0 67 -99 SPO 1997 10 13 01 02 74 6.2 -9 679.80 -53.8 -50.2 -53.0 67 -99 SPO 1997 10 13 01 03 74 6.2 -9 679.80 -53.8 -50.2 -53.0 67 -99 SPO 1997 10 13 01 04 74 6.3 -9 679.80 -53.8 -50.0 -53.0 67 -99 SPO 1997 10 13 01 05 74 6.3 -9 679.80 -53.8 -50.0 -53.0 67 -99 SPO 1997 10 13 01 06 74 6.2 -9 679.80 -53.8 -50.0 -53.0 67 -99 SPO 1997 10 13 01 07 74 6.2 -9 679.80 -53.8 -50.0 -53.0 67 -99 SPO 1997 10 13 01 08 74 6.2 -9 679.80 -53.8 -49.9 -53.0 67 -99 SPO 1997 10 13 01 09 75 6.3 -9 679.80 -53.8 -49.9 -53.0 66 -99 SPO 1997 10 13 01 10 75 6.1 -9 679.80 -53.8 -49.9 -53.0 66 -99 SPO 1997 10 13 01 11 75 5.8 -9 679.80 -53.8 -49.9 -53.0 66 -99 SPO 1997 10 13 01 12 76 5.8 -9 679.80 -53.9 -49.8 -53.0 67 -99 SPO 1997 10 13 01 13 76 5.7 -9 679.80 -53.9 -49.8 -53.0 67 -99 SPO 1997 10 13 01 14 75 5.8 -9 679.80 -54.0 -50.0 -53.1 67 -99 SPO 1997 10 13 01 15 75 5.8 -9 679.80 -54.0 -50.0 -53.1 67 -99 SPO 1997 10 13 01 16 75 5.9 -9 679.80 -54.0 -49.9 -53.1 67 -99 SPO 1997 10 13 01 17 74 5.9 -9 679.80 -54.0 -50.0 -53.1 67 -99 SPO 1997 10 13 01 18 74 6.0 -9 679.80 -54.0 -50.2 -53.2 66 -99 SPO 1997 10 13 01 19 74 6.2 -9 679.80 -54.0 -50.1 -53.2 65 -99 SPO 1997 10 13 01 20 74 6.2 -9 679.80 -54.0 -50.0 -53.2 64 -99 SPO 1997 10 13 01 21 73 6.2 -9 679.80 -54.0 -50.1 -53.2 64 -99 SPO 1997 10 13 01 22 73 6.3 -9 679.80 -54.0 -50.0 -53.1 65 -99 SPO 1997 10 13 01 23 74 6.3 -9 679.80 -53.9 -50.0 -53.1 65 -99 SPO 1997 10 13 01 24 74 6.2 -9 679.80 -53.8 -50.0 -53.0 64 -99 SPO 1997 10 13 01 25 73 6.2 -9 679.80 -53.8 -50.2 -53.0 65 -99 SPO 1997 10 13 01 26 73 6.2 -9 679.80 -53.8 -50.2 -53.1 65 -99 SPO 1997 10 13 01 27 73 6.4 -9 679.80 -53.9 -50.1 -53.1 66 -99 SPO 1997 10 13 01 28 72 6.4 -9 679.80 -53.8 -50.0 -53.1 66 -99 SPO 1997 10 13 01 29 72 6.4 -9 679.80 -53.8 -50.0 -53.1 66 -99 SPO 1997 10 13 01 30 72 6.7 -9 679.80 -53.8 -49.8 -53.2 66 -99 SPO 1997 10 13 01 31 72 6.7 -9 679.80 -53.8 -49.6 -53.2 66 -99 SPO 1997 10 13 01 32 71 6.5 -9 679.80 -53.8 -49.5 -53.2 65 -99 SPO 1997 10 13 01 33 71 6.5 -9 679.80 -53.9 -49.4 -53.2 66 -99 SPO 1997 10 13 01 34 71 6.5 -9 679.80 -53.9 -49.4 -53.2 65 -99 SPO 1997 10 13 01 35 70 6.4 -9 679.80 -53.9 -49.4 -53.2 65 -99 SPO 1997 10 13 01 36 70 6.3 -9 679.80 -53.9 -49.5 -53.2 65 -99 SPO 1997 10 13 01 37 70 6.4 -9 679.80 -53.9 -49.5 -53.2 65 -99 SPO 1997 10 13 01 38 70 6.4 -9 679.80 -53.9 -49.6 -53.2 65 -99 SPO 1997 10 13 01 39 71 6.5 -9 679.70 -53.9 -49.6 -53.2 65 -99 SPO 1997 10 13 01 40 71 6.5 -9 679.70 -53.9 -49.5 -53.2 66 -99 SPO 1997 10 13 01 41 71 6.6 -9 679.70 -53.9 -49.4 -53.2 66 -99 SPO 1997 10 13 01 42 72 6.7 -9 679.70 -53.9 -49.3 -53.3 66 -99 SPO 1997 10 13 01 43 73 6.8 -9 679.70 -53.9 -49.4 -53.3 67 -99 SPO 1997 10 13 01 44 73 6.8 -9 679.70 -53.9 -49.4 -53.2 67 -99 SPO 1997 10 13 01 45 75 6.8 -9 679.70 -53.8 -49.6 -53.2 65 -99 SPO 1997 10 13 01 46 75 6.6 -9 679.70 -53.9 -49.8 -53.2 66 -99 SPO 1997 10 13 01 47 76 6.5 -9 679.70 -53.9 -50.0 -53.2 66 -99 SPO 1997 10 13 01 48 77 6.4 -9 679.70 -53.9 -50.0 -53.2 65 -99 SPO 1997 10 13 01 49 80 6.5 -9 679.80 -54.0 -50.1 -53.2 66 -99 SPO 1997 10 13 01 50 82 6.5 -9 679.70 -54.0 -50.0 -53.1 66 -99 SPO 1997 10 13 01 51 83 6.3 -9 679.80 -54.0 -50.0 -53.1 66 -99 SPO 1997 10 13 01 52 84 6.4 -9 679.80 -54.0 -49.9 -53.0 65 -99 SPO 1997 10 13 01 53 85 6.4 -9 679.70 -54.0 -49.9 -53.0 65 -99 SPO 1997 10 13 01 54 85 6.5 -9 679.80 -54.0 -50.0 -53.1 65 -99 SPO 1997 10 13 01 55 84 6.5 -9 679.80 -54.0 -50.2 -53.1 65 -99 SPO 1997 10 13 01 56 84 6.5 -9 679.80 -54.0 -50.2 -53.2 65 -99 SPO 1997 10 13 01 57 84 6.6 -9 679.70 -54.0 -50.3 -53.2 65 -99 SPO 1997 10 13 01 58 84 6.7 -9 679.70 -54.0 -50.3 -53.1 65 -99 SPO 1997 10 13 01 59 83 6.5 -9 679.70 -53.9 -50.2 -53.0 64 -99 SPO 1997 10 13 02 00 82 6.4 -9 679.70 -53.8 -50.3 -53.0 64 0 SPO 1997 10 13 02 01 81 6.3 -9 679.70 -53.8 -50.2 -53.0 64 -99 SPO 1997 10 13 02 02 81 6.3 -9 679.60 -53.8 -50.2 -53.0 64 -99 SPO 1997 10 13 02 03 82 6.3 -9 679.60 -53.8 -50.1 -52.9 65 -99 SPO 1997 10 13 02 04 81 6.1 -9 679.60 -53.8 -50.2 -52.9 65 -99 SPO 1997 10 13 02 05 81 6.0 -9 679.70 -53.9 -50.2 -52.9 66 -99 SPO 1997 10 13 02 06 82 6.3 -9 679.70 -53.9 -50.3 -52.9 66 -99 SPO 1997 10 13 02 07 82 6.2 -9 679.70 -53.9 -50.2 -52.9 66 -99 SPO 1997 10 13 02 08 81 6.1 -9 679.60 -53.8 -50.2 -52.8 65 -99 SPO 1997 10 13 02 09 80 6.2 -9 679.60 -53.8 -50.2 -52.8 67 -99 SPO 1997 10 13 02 10 80 6.2 -9 679.60 -53.8 -50.2 -52.8 67 -99 SPO 1997 10 13 02 11 79 6.2 -9 679.60 -53.8 -50.4 -52.8 67 -99 SPO 1997 10 13 02 12 79 6.1 -9 679.50 -53.8 -50.3 -52.8 67 -99 SPO 1997 10 13 02 13 79 6.2 -9 679.50 -53.8 -50.3 -52.9 68 -99 SPO 1997 10 13 02 14 79 6.1 -9 679.50 -53.9 -50.4 -52.9 69 -99 SPO 1997 10 13 02 15 78 6.1 -9 679.50 -53.8 -50.5 -52.9 68 -99 SPO 1997 10 13 02 16 77 6.0 -9 679.50 -53.8 -50.5 -52.9 68 -99 SPO 1997 10 13 02 17 76 6.0 -9 679.50 -53.8 -50.5 -53.0 68 -99 SPO 1997 10 13 02 18 76 6.0 -9 679.50 -53.8 -50.6 -53.0 68 -99 SPO 1997 10 13 02 19 74 6.0 -9 679.40 -53.8 -50.5 -53.0 68 -99 SPO 1997 10 13 02 20 74 6.2 -9 679.40 -53.9 -50.4 -53.0 69 -99 SPO 1997 10 13 02 21 74 6.2 -9 679.40 -53.9 -50.3 -53.1 68 -99 SPO 1997 10 13 02 22 74 6.2 -9 679.40 -54.0 -50.2 -53.1 68 -99 SPO 1997 10 13 02 23 74 6.2 -9 679.40 -54.0 -50.2 -53.1 67 -99 SPO 1997 10 13 02 24 75 6.3 -9 679.40 -54.1 -50.3 -53.2 67 -99 SPO 1997 10 13 02 25 75 6.3 -9 679.40 -54.2 -50.4 -53.2 68 -99 SPO 1997 10 13 02 26 74 6.3 -9 679.40 -54.2 -50.4 -53.2 68 -99 SPO 1997 10 13 02 27 73 6.3 -9 679.40 -54.2 -50.5 -53.2 68 -99 SPO 1997 10 13 02 28 73 6.3 -9 679.30 -54.2 -50.4 -53.2 68 -99 SPO 1997 10 13 02 29 73 6.2 -9 679.30 -54.2 -50.4 -53.2 67 -99 SPO 1997 10 13 02 30 72 6.0 -9 679.40 -54.2 -50.4 -53.3 67 -99 SPO 1997 10 13 02 31 72 5.9 -9 679.30 -54.2 -50.5 -53.2 67 -99 SPO 1997 10 13 02 32 72 5.9 -9 679.40 -54.2 -50.6 -53.2 67 -99 SPO 1997 10 13 02 33 72 5.9 -9 679.40 -54.2 -50.6 -53.2 67 -99 SPO 1997 10 13 02 34 72 5.8 -9 679.40 -54.2 -50.7 -53.2 67 -99 SPO 1997 10 13 02 35 71 5.6 -9 679.40 -54.2 -50.7 -53.2 66 -99 SPO 1997 10 13 02 36 71 5.6 -9 679.40 -54.2 -50.6 -53.2 66 -99 SPO 1997 10 13 02 37 71 5.7 -9 679.30 -54.2 -50.6 -53.2 66 -99 SPO 1997 10 13 02 38 72 5.5 -9 679.30 -54.3 -50.7 -53.2 67 -99 SPO 1997 10 13 02 39 73 5.3 -9 679.30 -54.4 -50.8 -53.3 67 -99 SPO 1997 10 13 02 40 75 5.5 -9 679.30 -54.6 -50.8 -53.4 68 -99 SPO 1997 10 13 02 41 76 5.6 -9 679.30 -54.6 -50.8 -53.4 67 -99 SPO 1997 10 13 02 42 76 5.5 -9 679.30 -54.6 -50.9 -53.3 66 -99 SPO 1997 10 13 02 43 77 5.6 -9 679.30 -54.6 -50.9 -53.2 66 -99 SPO 1997 10 13 02 44 77 5.7 -9 679.30 -54.6 -50.9 -53.2 66 -99 SPO 1997 10 13 02 45 77 5.8 -9 679.30 -54.6 -50.9 -53.2 65 -99 SPO 1997 10 13 02 46 77 5.7 -9 679.30 -54.6 -50.9 -53.2 65 -99 SPO 1997 10 13 02 47 78 5.7 -9 679.30 -54.6 -50.9 -53.2 64 -99 SPO 1997 10 13 02 48 79 5.8 -9 679.30 -54.7 -50.8 -53.2 64 -99 SPO 1997 10 13 02 49 79 5.8 -9 679.30 -54.7 -50.8 -53.3 64 -99 SPO 1997 10 13 02 50 78 5.8 -9 679.30 -54.8 -50.8 -53.3 65 -99 SPO 1997 10 13 02 51 78 5.7 -9 679.30 -54.8 -50.8 -53.4 65 -99 SPO 1997 10 13 02 52 77 5.6 -9 679.30 -54.8 -50.8 -53.4 65 -99 SPO 1997 10 13 02 53 77 5.5 -9 679.20 -54.8 -50.8 -53.4 65 -99 SPO 1997 10 13 02 54 77 5.3 -9 679.20 -54.8 -50.9 -53.4 65 -99 SPO 1997 10 13 02 55 78 5.2 -9 679.20 -54.8 -51.0 -53.4 65 -99 SPO 1997 10 13 02 56 78 5.1 -9 679.20 -54.8 -51.0 -53.4 64 -99 SPO 1997 10 13 02 57 77 5.1 -9 679.20 -54.9 -51.1 -53.4 65 -99 SPO 1997 10 13 02 58 75 5.1 -9 679.20 -54.8 -51.1 -53.3 63 -99 SPO 1997 10 13 02 59 76 4.9 -9 679.20 -54.9 -51.1 -53.3 63 -99 SPO 1997 10 13 03 00 75 4.9 -9 679.20 -54.8 -51.0 -53.3 62 0 SPO 1997 10 13 03 01 75 4.9 -9 679.20 -54.8 -51.1 -53.2 63 -99 SPO 1997 10 13 03 02 74 4.9 -9 679.20 -54.8 -51.1 -53.2 64 -99 SPO 1997 10 13 03 03 74 5.0 -9 679.20 -54.8 -51.0 -53.2 64 -99 SPO 1997 10 13 03 04 73 4.9 -9 679.20 -54.8 -51.0 -53.2 65 -99 SPO 1997 10 13 03 05 73 4.8 -9 679.20 -54.8 -50.9 -53.3 65 -99 SPO 1997 10 13 03 06 73 4.8 -9 679.20 -54.9 -50.9 -53.3 65 -99 SPO 1997 10 13 03 07 74 4.8 -9 679.20 -54.9 -50.9 -53.3 65 -99 SPO 1997 10 13 03 08 73 4.6 -9 679.20 -55.0 -50.9 -53.3 65 -99 SPO 1997 10 13 03 09 73 4.8 -9 679.20 -55.0 -50.8 -53.3 65 -99 SPO 1997 10 13 03 10 71 5.0 -9 679.20 -55.0 -50.8 -53.4 64 -99 SPO 1997 10 13 03 11 71 5.2 -9 679.20 -55.0 -50.6 -53.4 64 -99 SPO 1997 10 13 03 12 71 5.2 -9 679.20 -55.0 -50.6 -53.4 63 -99 SPO 1997 10 13 03 13 69 5.3 -9 679.20 -55.0 -50.6 -53.4 62 -99 SPO 1997 10 13 03 14 69 5.3 -9 679.20 -54.9 -50.6 -53.5 62 -99 SPO 1997 10 13 03 15 68 5.4 -9 679.20 -54.8 -50.6 -53.5 62 -99 SPO 1997 10 13 03 16 69 5.6 -9 679.20 -54.8 -50.6 -53.5 63 -99 SPO 1997 10 13 03 17 68 5.4 -9 679.20 -54.8 -50.5 -53.4 63 -99 SPO 1997 10 13 03 18 68 5.3 -9 679.20 -54.6 -50.6 -53.5 63 -99 SPO 1997 10 13 03 19 69 5.2 -9 679.20 -54.6 -50.5 -53.4 63 -99 SPO 1997 10 13 03 20 69 5.1 -9 679.20 -54.4 -50.4 -53.2 63 -99 SPO 1997 10 13 03 21 69 5.1 -9 679.20 -54.3 -50.4 -53.1 63 -99 SPO 1997 10 13 03 22 70 5.2 -9 679.20 -54.2 -50.4 -53.1 64 -99 SPO 1997 10 13 03 23 71 5.2 -9 679.20 -54.2 -50.4 -53.0 65 -99 SPO 1997 10 13 03 24 71 5.0 -9 679.10 -54.2 -50.3 -52.9 65 -99 SPO 1997 10 13 03 25 71 4.9 -9 679.20 -54.2 -50.4 -52.9 65 -99 SPO 1997 10 13 03 26 71 5.0 -9 679.20 -54.2 -50.4 -52.9 65 -99 SPO 1997 10 13 03 27 72 5.2 -9 679.10 -54.2 -50.3 -52.9 65 -99 SPO 1997 10 13 03 28 72 5.2 -9 679.10 -54.2 -50.3 -52.9 66 -99 SPO 1997 10 13 03 29 72 5.3 -9 679.10 -54.2 -50.3 -52.9 66 -99 SPO 1997 10 13 03 30 71 5.4 -9 679.10 -54.3 -50.2 -52.9 67 -99 SPO 1997 10 13 03 31 71 5.3 -9 679.10 -54.3 -50.3 -52.9 67 -99 SPO 1997 10 13 03 32 71 5.2 -9 679.10 -54.3 -50.3 -52.9 67 -99 SPO 1997 10 13 03 33 71 5.3 -9 679.10 -54.3 -50.3 -52.9 67 -99 SPO 1997 10 13 03 34 70 5.3 -9 679.10 -54.2 -50.2 -52.9 67 -99 SPO 1997 10 13 03 35 70 5.2 -9 679.10 -54.2 -50.2 -52.9 67 -99 SPO 1997 10 13 03 36 71 5.1 -9 679.00 -54.3 -50.2 -52.8 67 -99 SPO 1997 10 13 03 37 70 5.2 -9 679.00 -54.3 -50.2 -52.8 67 -99 SPO 1997 10 13 03 38 70 5.0 -9 679.00 -54.3 -50.2 -52.8 67 -99 SPO 1997 10 13 03 39 70 4.9 -9 679.00 -54.4 -50.2 -52.9 67 -99 SPO 1997 10 13 03 40 71 5.0 -9 679.00 -54.4 -50.3 -52.8 67 -99 SPO 1997 10 13 03 41 69 4.7 -9 679.00 -54.3 -50.4 -52.8 67 -99 SPO 1997 10 13 03 42 70 4.9 -9 679.00 -54.3 -50.3 -52.8 67 -99 SPO 1997 10 13 03 43 69 4.8 -9 679.00 -54.2 -50.4 -52.8 67 -99 SPO 1997 10 13 03 44 69 4.9 -9 679.00 -54.2 -50.5 -52.8 67 -99 SPO 1997 10 13 03 45 70 5.0 -9 679.00 -54.3 -50.4 -52.8 67 -99 SPO 1997 10 13 03 46 70 5.1 -9 679.00 -54.4 -50.4 -52.8 67 -99 SPO 1997 10 13 03 47 69 5.2 -9 679.00 -54.4 -50.5 -52.8 67 -99 SPO 1997 10 13 03 48 70 5.4 -9 678.90 -54.3 -50.4 -52.9 67 -99 SPO 1997 10 13 03 49 68 5.3 -9 678.90 -54.3 -50.4 -52.9 67 -99 SPO 1997 10 13 03 50 68 5.4 -9 678.90 -54.3 -50.4 -52.9 67 -99 SPO 1997 10 13 03 51 68 5.5 -9 678.90 -54.2 -50.3 -52.9 67 -99 SPO 1997 10 13 03 52 67 5.4 -9 678.90 -54.2 -50.2 -52.9 67 -99 SPO 1997 10 13 03 53 68 5.3 -9 678.90 -54.0 -50.2 -52.9 66 -99 SPO 1997 10 13 03 54 68 5.4 -9 678.90 -54.0 -50.1 -52.8 67 -99 SPO 1997 10 13 03 55 69 5.4 -9 678.90 -53.9 -50.1 -52.8 66 -99 SPO 1997 10 13 03 56 69 5.3 -9 678.90 -54.0 -50.2 -52.8 67 -99 SPO 1997 10 13 03 57 69 5.4 -9 678.90 -53.8 -50.2 -52.8 67 -99 SPO 1997 10 13 03 58 70 5.5 -9 678.90 -53.7 -50.1 -52.7 67 -99 SPO 1997 10 13 03 59 70 5.5 -9 678.90 -53.7 -50.2 -52.7 67 -99 SPO 1997 10 13 04 00 71 5.5 -9 678.90 -53.7 -50.1 -52.6 67 0 SPO 1997 10 13 04 01 71 5.5 -9 678.90 -53.7 -50.1 -52.6 67 -99 SPO 1997 10 13 04 02 72 5.5 -9 678.90 -53.7 -50.2 -52.6 67 -99 SPO 1997 10 13 04 03 73 5.7 -9 678.90 -53.7 -50.2 -52.6 67 -99 SPO 1997 10 13 04 04 73 5.6 -9 678.90 -53.6 -50.2 -52.5 67 -99 SPO 1997 10 13 04 05 72 5.6 -9 678.90 -53.7 -50.3 -52.6 68 -99 SPO 1997 10 13 04 06 73 5.7 -9 678.90 -53.6 -50.3 -52.6 68 -99 SPO 1997 10 13 04 07 74 5.7 -9 678.90 -53.6 -50.2 -52.5 68 -99 SPO 1997 10 13 04 08 75 5.7 -9 678.90 -53.6 -50.3 -52.4 69 -99 SPO 1997 10 13 04 09 75 5.7 -9 678.90 -53.6 -50.3 -52.4 69 -99 SPO 1997 10 13 04 10 76 5.6 -9 678.90 -53.6 -50.2 -52.4 69 -99 SPO 1997 10 13 04 11 76 5.7 -9 678.90 -53.6 -50.2 -52.4 69 -99 SPO 1997 10 13 04 12 76 5.7 -9 678.90 -53.5 -50.3 -52.4 69 -99 SPO 1997 10 13 04 13 76 5.7 -9 678.90 -53.4 -50.2 -52.3 68 -99 SPO 1997 10 13 04 14 77 5.7 -9 678.90 -53.4 -50.2 -52.3 68 -99 SPO 1997 10 13 04 15 76 5.7 -9 678.90 -53.4 -50.2 -52.2 68 -99 SPO 1997 10 13 04 16 76 5.8 -9 678.90 -53.3 -50.1 -52.2 68 -99 SPO 1997 10 13 04 17 76 5.8 -9 678.80 -53.3 -50.1 -52.2 67 -99 SPO 1997 10 13 04 18 76 5.6 -9 678.80 -53.4 -50.1 -52.2 68 -99 SPO 1997 10 13 04 19 76 5.7 -9 678.80 -53.4 -50.2 -52.2 68 -99 SPO 1997 10 13 04 20 76 5.7 -9 678.80 -53.4 -50.2 -52.2 68 -99 SPO 1997 10 13 04 21 75 5.8 -9 678.80 -53.5 -50.2 -52.3 68 -99 SPO 1997 10 13 04 22 75 5.8 -9 678.80 -53.6 -50.2 -52.4 69 -99 SPO 1997 10 13 04 23 73 5.7 -9 678.80 -53.6 -50.2 -52.5 69 -99 SPO 1997 10 13 04 24 72 5.9 -9 678.80 -53.6 -50.3 -52.6 68 -99 SPO 1997 10 13 04 25 72 6.1 -9 678.80 -53.6 -50.2 -52.6 68 -99 SPO 1997 10 13 04 26 71 6.0 -9 678.80 -53.5 -50.2 -52.6 68 -99 SPO 1997 10 13 04 27 69 5.8 -9 678.80 -53.4 -50.1 -52.6 67 -99 SPO 1997 10 13 04 28 69 5.9 -9 678.80 -53.4 -50.2 -52.6 67 -99 SPO 1997 10 13 04 29 70 5.9 -9 678.80 -53.3 -49.9 -52.5 66 -99 SPO 1997 10 13 04 30 70 5.8 -9 678.80 -53.3 -49.9 -52.5 66 -99 SPO 1997 10 13 04 31 71 5.5 -9 678.80 -53.3 -50.0 -52.4 66 -99 SPO 1997 10 13 04 32 70 5.2 -9 678.80 -53.4 -50.2 -52.5 67 -99 SPO 1997 10 13 04 33 71 5.3 -9 678.80 -53.4 -50.1 -52.5 67 -99 SPO 1997 10 13 04 34 71 5.4 -9 678.80 -53.5 -50.1 -52.5 68 -99 SPO 1997 10 13 04 35 69 5.3 -9 678.80 -53.5 -50.2 -52.5 68 -99 SPO 1997 10 13 04 36 69 5.4 -9 678.80 -53.4 -50.3 -52.6 66 -99 SPO 1997 10 13 04 37 68 5.4 -9 678.80 -53.4 -50.3 -52.6 67 -99 SPO 1997 10 13 04 38 68 5.3 -9 678.80 -53.4 -50.2 -52.6 67 -99 SPO 1997 10 13 04 39 68 5.2 -9 678.80 -53.5 -50.1 -52.6 68 -99 SPO 1997 10 13 04 40 66 4.9 -9 678.80 -53.6 -50.2 -52.7 68 -99 SPO 1997 10 13 04 41 68 5.2 -9 678.80 -53.6 -50.4 -52.8 68 -99 SPO 1997 10 13 04 42 68 5.2 -9 678.80 -53.6 -50.2 -52.8 67 -99 SPO 1997 10 13 04 43 69 5.4 -9 678.80 -53.6 -50.1 -52.8 66 -99 SPO 1997 10 13 04 44 68 5.1 -9 678.80 -53.6 -50.1 -52.8 65 -99 SPO 1997 10 13 04 45 69 5.1 -9 678.80 -53.6 -50.2 -52.8 65 -99 SPO 1997 10 13 04 46 70 5.2 -9 678.80 -53.6 -50.3 -52.8 65 -99 SPO 1997 10 13 04 47 72 5.2 -9 678.80 -53.6 -50.2 -52.7 65 -99 SPO 1997 10 13 04 48 71 4.8 -9 678.80 -53.5 -50.4 -52.7 65 -99 SPO 1997 10 13 04 49 72 4.7 -9 678.80 -53.6 -50.5 -52.7 67 -99 SPO 1997 10 13 04 50 74 4.8 -9 678.80 -53.6 -50.5 -52.7 67 -99 SPO 1997 10 13 04 51 74 4.8 -9 678.80 -53.7 -50.5 -52.7 67 -99 SPO 1997 10 13 04 52 75 4.9 -9 678.80 -53.8 -50.3 -52.8 67 -99 SPO 1997 10 13 04 53 73 4.7 -9 678.80 -53.9 -50.4 -52.9 67 -99 SPO 1997 10 13 04 54 72 4.6 -9 678.80 -54.0 -50.7 -53.0 67 -99 SPO 1997 10 13 04 55 71 4.6 -9 678.80 -54.1 -50.6 -53.0 67 -99 SPO 1997 10 13 04 56 72 4.7 -9 678.80 -54.1 -50.6 -53.1 67 -99 SPO 1997 10 13 04 57 70 4.7 -9 678.80 -54.2 -50.5 -53.2 67 -99 SPO 1997 10 13 04 58 69 4.7 -9 678.80 -54.2 -50.5 -53.2 67 -99 SPO 1997 10 13 04 59 69 4.9 -9 678.80 -54.2 -50.5 -53.3 67 -99 SPO 1997 10 13 05 00 69 5.0 -9 678.80 -54.2 -50.3 -53.3 67 0 SPO 1997 10 13 05 01 68 5.0 -9 678.80 -54.2 -50.2 -53.4 67 -99 SPO 1997 10 13 05 02 67 5.1 -9 678.70 -54.2 -50.3 -53.5 67 -99 SPO 1997 10 13 05 03 67 5.3 -9 678.70 -54.2 -50.2 -53.5 67 -99 SPO 1997 10 13 05 04 67 5.5 -9 678.70 -54.1 -50.0 -53.5 66 -99 SPO 1997 10 13 05 05 67 5.7 -9 678.70 -54.0 -49.8 -53.4 65 -99 SPO 1997 10 13 05 06 67 5.9 -9 678.70 -53.8 -49.7 -53.4 65 -99 SPO 1997 10 13 05 07 67 5.9 -9 678.70 -53.8 -49.6 -53.4 66 -99 SPO 1997 10 13 05 08 65 6.0 -9 678.60 -53.8 -49.6 -53.4 66 -99 SPO 1997 10 13 05 09 64 6.2 -9 678.60 -53.7 -49.6 -53.3 65 -99 SPO 1997 10 13 05 10 65 6.5 -9 678.60 -53.6 -49.4 -53.2 64 -99 SPO 1997 10 13 05 11 64 6.3 -9 678.60 -53.5 -49.4 -53.2 64 -99 SPO 1997 10 13 05 12 63 6.3 -9 678.60 -53.4 -49.5 -53.1 64 -99 SPO 1997 10 13 05 13 64 6.3 -9 678.60 -53.4 -49.4 -53.1 66 -99 SPO 1997 10 13 05 14 64 6.4 -9 678.60 -53.3 -49.4 -53.0 67 -99 SPO 1997 10 13 05 15 64 6.3 -9 678.60 -53.3 -49.5 -53.1 68 -99 SPO 1997 10 13 05 16 66 6.3 -9 678.60 -53.3 -49.4 -53.0 69 -99 SPO 1997 10 13 05 17 65 6.1 -9 678.60 -53.2 -49.5 -53.0 68 -99 SPO 1997 10 13 05 18 66 6.1 -9 678.60 -53.2 -49.6 -53.0 70 -99 SPO 1997 10 13 05 19 67 6.0 -9 678.60 -53.2 -49.4 -53.0 70 -99 SPO 1997 10 13 05 20 67 6.0 -9 678.60 -53.2 -49.5 -53.0 70 -99 SPO 1997 10 13 05 21 68 6.0 -9 678.60 -53.1 -49.6 -52.9 69 -99 SPO 1997 10 13 05 22 68 6.1 -9 678.60 -53.2 -49.6 -52.9 70 -99 SPO 1997 10 13 05 23 68 6.2 -9 678.50 -53.2 -49.4 -52.9 69 -99 SPO 1997 10 13 05 24 67 6.1 -9 678.50 -53.2 -49.5 -52.9 68 -99 SPO 1997 10 13 05 25 67 6.1 -9 678.50 -53.2 -49.5 -52.9 68 -99 SPO 1997 10 13 05 26 67 6.2 -9 678.50 -53.2 -49.5 -52.9 68 -99 SPO 1997 10 13 05 27 67 6.1 -9 678.50 -53.2 -49.6 -52.9 68 -99 SPO 1997 10 13 05 28 67 6.2 -9 678.50 -53.2 -49.7 -52.9 68 -99 SPO 1997 10 13 05 29 67 5.9 -9 678.50 -53.2 -49.8 -52.9 68 -99 SPO 1997 10 13 05 30 66 5.8 -9 678.50 -53.2 -50.0 -52.9 68 -99 SPO 1997 10 13 05 31 66 6.1 -9 678.50 -53.2 -49.9 -52.9 68 -99 SPO 1997 10 13 05 32 66 6.2 -9 678.50 -53.2 -49.9 -52.9 68 -99 SPO 1997 10 13 05 33 65 6.0 -9 678.50 -53.2 -49.8 -52.9 69 -99 SPO 1997 10 13 05 34 64 6.0 -9 678.50 -53.1 -49.9 -52.8 68 -99 SPO 1997 10 13 05 35 65 5.9 -9 678.50 -53.1 -49.9 -52.8 68 -99 SPO 1997 10 13 05 36 66 6.1 -9 678.50 -53.1 -49.9 -52.8 68 -99 SPO 1997 10 13 05 37 66 6.2 -9 678.50 -53.0 -49.7 -52.8 67 -99 SPO 1997 10 13 05 38 66 6.2 -9 678.50 -53.0 -49.6 -52.8 67 -99 SPO 1997 10 13 05 39 66 6.3 -9 678.50 -53.0 -49.5 -52.8 67 -99 SPO 1997 10 13 05 40 66 6.2 -9 678.50 -53.0 -49.4 -52.7 68 -99 SPO 1997 10 13 05 41 65 6.1 -9 678.50 -53.0 -49.5 -52.7 68 -99 SPO 1997 10 13 05 42 64 6.2 -9 678.50 -53.1 -49.5 -52.8 68 -99 SPO 1997 10 13 05 43 63 6.3 -9 678.50 -53.1 -49.3 -52.8 68 -99 SPO 1997 10 13 05 44 62 6.5 -9 678.50 -53.1 -49.3 -52.8 68 -99 SPO 1997 10 13 05 45 62 6.5 -9 678.40 -53.1 -49.2 -52.8 68 -99 SPO 1997 10 13 05 46 62 6.6 -9 678.40 -53.0 -49.0 -52.7 66 -99 SPO 1997 10 13 05 47 62 6.5 -9 678.40 -53.0 -49.0 -52.7 66 -99 SPO 1997 10 13 05 48 63 6.5 -9 678.40 -53.1 -49.0 -52.8 66 -99 SPO 1997 10 13 05 49 63 6.6 -9 678.40 -53.1 -49.0 -52.8 66 -99 SPO 1997 10 13 05 50 64 6.6 -9 678.40 -53.2 -49.0 -52.8 66 -99 SPO 1997 10 13 05 51 65 6.6 -9 678.40 -53.2 -49.0 -52.9 66 -99 SPO 1997 10 13 05 52 65 6.6 -9 678.40 -53.2 -49.2 -52.9 66 -99 SPO 1997 10 13 05 53 65 6.6 -9 678.40 -53.1 -49.2 -52.8 65 -99 SPO 1997 10 13 05 54 65 6.7 -9 678.40 -53.0 -49.2 -52.7 65 -99 SPO 1997 10 13 05 55 65 6.6 -9 678.30 -52.8 -49.1 -52.6 64 -99 SPO 1997 10 13 05 56 65 6.4 -9 678.30 -52.7 -49.1 -52.5 64 -99 SPO 1997 10 13 05 57 65 6.4 -9 678.30 -52.8 -49.2 -52.6 65 -99 SPO 1997 10 13 05 58 66 6.5 -9 678.30 -52.8 -49.2 -52.5 65 -99 SPO 1997 10 13 05 59 67 6.4 -9 678.40 -52.8 -49.3 -52.4 65 -99 SPO 1997 10 13 06 00 68 6.2 -9 678.40 -52.8 -49.4 -52.4 65 0 SPO 1997 10 13 06 01 69 6.1 -9 678.40 -52.7 -49.5 -52.3 64 -99 SPO 1997 10 13 06 02 70 5.9 -9 678.40 -52.6 -49.6 -52.2 63 -99 SPO 1997 10 13 06 03 71 5.9 -9 678.40 -52.6 -49.8 -52.2 64 -99 SPO 1997 10 13 06 04 72 6.1 -9 678.40 -52.7 -49.8 -52.2 65 -99 SPO 1997 10 13 06 05 72 5.9 -9 678.40 -52.7 -49.8 -52.1 65 -99 SPO 1997 10 13 06 06 72 5.8 -9 678.40 -52.7 -49.8 -52.1 66 -99 SPO 1997 10 13 06 07 73 6.0 -9 678.40 -52.8 -49.9 -52.2 67 -99 SPO 1997 10 13 06 08 73 5.8 -9 678.40 -52.8 -50.0 -52.1 67 -99 SPO 1997 10 13 06 09 73 5.8 -9 678.40 -52.9 -50.0 -52.2 67 -99 SPO 1997 10 13 06 10 74 5.8 -9 678.40 -52.9 -50.0 -52.1 66 -99 SPO 1997 10 13 06 11 74 5.7 -9 678.40 -52.9 -50.1 -52.2 66 -99 SPO 1997 10 13 06 12 74 5.7 -9 678.40 -53.0 -50.1 -52.2 66 -99 SPO 1997 10 13 06 13 73 5.6 -9 678.40 -53.0 -50.1 -52.2 65 -99 SPO 1997 10 13 06 14 71 5.8 -9 678.40 -53.1 -50.0 -52.3 65 -99 SPO 1997 10 13 06 15 70 5.9 -9 678.40 -53.1 -49.8 -52.3 64 -99 SPO 1997 10 13 06 16 69 6.0 -9 678.40 -53.2 -49.6 -52.4 65 -99 SPO 1997 10 13 06 17 68 6.0 -9 678.40 -53.3 -49.6 -52.6 66 -99 SPO 1997 10 13 06 18 69 6.3 -9 678.40 -53.2 -49.6 -52.6 65 -99 SPO 1997 10 13 06 19 69 6.2 -9 678.30 -53.1 -49.4 -52.4 64 -99 SPO 1997 10 13 06 20 66 6.3 -9 678.30 -53.0 -49.5 -52.3 64 -99 SPO 1997 10 13 06 21 66 6.2 -9 678.30 -52.9 -49.6 -52.2 64 -99 SPO 1997 10 13 06 22 69 6.2 -9 678.30 -52.7 -49.7 -52.1 63 -99 SPO 1997 10 13 06 23 70 6.2 -9 678.30 -52.9 -49.8 -52.2 65 -99 SPO 1997 10 13 06 24 70 6.1 -9 678.30 -53.0 -49.8 -52.3 67 -99 SPO 1997 10 13 06 25 70 6.0 -9 678.30 -53.1 -49.8 -52.4 67 -99 SPO 1997 10 13 06 26 70 5.8 -9 678.30 -53.2 -50.0 -52.4 67 -99 SPO 1997 10 13 06 27 70 5.8 -9 678.30 -53.4 -49.9 -52.6 67 -99 SPO 1997 10 13 06 28 70 5.8 -9 678.30 -53.5 -49.9 -52.6 67 -99 SPO 1997 10 13 06 29 70 5.8 -9 678.30 -53.5 -50.0 -52.7 66 -99 SPO 1997 10 13 06 30 69 5.7 -9 678.30 -53.6 -50.0 -52.8 67 -99 SPO 1997 10 13 06 31 69 5.9 -9 678.30 -53.6 -49.9 -52.7 66 -99 SPO 1997 10 13 06 32 69 5.9 -9 678.20 -53.6 -50.0 -52.7 66 -99 SPO 1997 10 13 06 33 69 5.6 -9 678.20 -53.6 -50.2 -52.7 65 -99 SPO 1997 10 13 06 34 68 5.5 -9 678.20 -53.6 -50.5 -52.7 64 -99 SPO 1997 10 13 06 35 67 5.5 -9 678.20 -53.6 -50.5 -52.7 65 -99 SPO 1997 10 13 06 36 66 5.5 -9 678.20 -53.6 -50.5 -52.8 65 -99 SPO 1997 10 13 06 37 64 5.5 -9 678.20 -53.6 -50.4 -52.8 65 -99 SPO 1997 10 13 06 38 64 5.7 -9 678.20 -53.6 -50.3 -52.8 65 -99 SPO 1997 10 13 06 39 63 5.8 -9 678.20 -53.4 -50.1 -52.7 63 -99 SPO 1997 10 13 06 40 65 5.8 -9 678.20 -53.4 -50.1 -52.7 63 -99 SPO 1997 10 13 06 41 64 5.8 -9 678.20 -53.3 -50.1 -52.6 63 -99 SPO 1997 10 13 06 42 63 6.1 -9 678.20 -53.2 -50.1 -52.6 62 -99 SPO 1997 10 13 06 43 63 6.1 -9 678.20 -53.2 -49.9 -52.6 64 -99 SPO 1997 10 13 06 44 62 6.2 -9 678.20 -53.2 -50.0 -52.6 64 -99 SPO 1997 10 13 06 45 59 6.5 -9 678.20 -53.1 -50.0 -52.5 64 -99 SPO 1997 10 13 06 46 60 6.6 -9 678.20 -53.0 -50.0 -52.4 63 -99 SPO 1997 10 13 06 47 59 6.5 -9 678.20 -52.9 -50.0 -52.4 63 -99 SPO 1997 10 13 06 48 58 6.7 -9 678.20 -52.9 -50.0 -52.4 64 -99 SPO 1997 10 13 06 49 58 6.5 -9 678.20 -52.8 -49.9 -52.3 63 -99 SPO 1997 10 13 06 50 57 6.4 -9 678.20 -52.8 -50.1 -52.3 63 -99 SPO 1997 10 13 06 51 58 6.2 -9 678.20 -52.8 -50.3 -52.3 63 -99 SPO 1997 10 13 06 52 59 6.0 -9 678.20 -52.8 -50.4 -52.3 63 -99 SPO 1997 10 13 06 53 58 6.2 -9 678.20 -52.8 -50.4 -52.3 63 -99 SPO 1997 10 13 06 54 60 6.0 -9 678.20 -52.8 -50.4 -52.2 63 -99 SPO 1997 10 13 06 55 58 6.0 -9 678.20 -52.8 -50.4 -52.3 64 -99 SPO 1997 10 13 06 56 59 6.1 -9 678.20 -52.8 -50.4 -52.2 64 -99 SPO 1997 10 13 06 57 58 6.3 -9 678.20 -52.7 -50.4 -52.3 64 -99 SPO 1997 10 13 06 58 57 6.3 -9 678.20 -52.7 -50.4 -52.2 65 -99 SPO 1997 10 13 06 59 57 6.2 -9 678.20 -52.7 -50.5 -52.2 65 -99 SPO 1997 10 13 07 00 57 6.4 -9 678.20 -52.7 -50.4 -52.2 65 0 SPO 1997 10 13 07 01 55 6.6 -9 678.20 -52.6 -50.3 -52.1 64 -99 SPO 1997 10 13 07 02 55 6.7 -9 678.20 -52.6 -50.2 -52.1 65 -99 SPO 1997 10 13 07 03 55 6.9 -9 678.20 -52.6 -50.0 -52.1 65 -99 SPO 1997 10 13 07 04 54 7.1 -9 678.10 -52.5 -50.0 -52.1 65 -99 SPO 1997 10 13 07 05 53 7.3 -9 678.10 -52.4 -49.8 -52.0 64 -99 SPO 1997 10 13 07 06 53 7.3 -9 678.10 -52.4 -49.6 -52.0 64 -99 SPO 1997 10 13 07 07 53 7.2 -9 678.10 -52.5 -49.4 -52.0 65 -99 SPO 1997 10 13 07 08 53 7.3 -9 678.10 -52.4 -49.2 -52.0 64 -99 SPO 1997 10 13 07 09 54 7.3 -9 678.10 -52.4 -49.4 -52.0 65 -99 SPO 1997 10 13 07 10 54 7.1 -9 678.10 -52.4 -49.4 -52.0 65 -99 SPO 1997 10 13 07 11 55 7.3 -9 678.10 -52.5 -49.3 -52.1 66 -99 SPO 1997 10 13 07 12 54 7.4 -9 678.10 -52.5 -49.2 -52.1 66 -99 SPO 1997 10 13 07 13 56 7.4 -9 678.10 -52.5 -49.3 -52.0 66 -99 SPO 1997 10 13 07 14 56 7.4 -9 678.10 -52.5 -49.1 -52.0 66 -99 SPO 1997 10 13 07 15 57 7.5 -9 678.10 -52.5 -49.1 -52.0 65 -99 SPO 1997 10 13 07 16 57 7.3 -9 678.10 -52.4 -49.2 -52.0 65 -99 SPO 1997 10 13 07 17 57 7.2 -9 678.10 -52.5 -49.3 -52.0 65 -99 SPO 1997 10 13 07 18 58 7.0 -9 678.10 -52.5 -49.3 -52.0 65 -99 SPO 1997 10 13 07 19 59 7.1 -9 678.10 -52.5 -49.4 -52.0 65 -99 SPO 1997 10 13 07 20 58 7.1 -9 678.20 -52.5 -49.4 -52.1 65 -99 SPO 1997 10 13 07 21 58 7.0 -9 678.20 -52.5 -49.4 -52.1 65 -99 SPO 1997 10 13 07 22 59 7.0 -9 678.20 -52.5 -49.3 -52.1 65 -99 SPO 1997 10 13 07 23 60 6.9 -9 678.20 -52.5 -49.2 -52.1 65 -99 SPO 1997 10 13 07 24 60 6.8 -9 678.20 -52.5 -49.2 -52.1 65 -99 SPO 1997 10 13 07 25 59 7.2 -9 678.20 -52.6 -49.1 -52.2 65 -99 SPO 1997 10 13 07 26 61 7.1 -9 678.20 -52.6 -49.2 -52.2 65 -99 SPO 1997 10 13 07 27 61 6.3 -9 678.20 -52.5 -49.4 -52.1 65 -99 SPO 1997 10 13 07 28 60 6.2 -9 678.20 -52.6 -49.8 -52.2 65 -99 SPO 1997 10 13 07 29 61 6.1 -9 678.20 -52.8 -49.8 -52.3 65 -99 SPO 1997 10 13 07 30 61 6.1 -9 678.20 -52.8 -49.8 -52.3 65 -99 SPO 1997 10 13 07 31 62 6.3 -9 678.20 -52.8 -49.7 -52.3 64 -99 SPO 1997 10 13 07 32 62 6.0 -9 678.20 -52.8 -49.8 -52.3 64 -99 SPO 1997 10 13 07 33 63 6.0 -9 678.20 -52.8 -49.9 -52.3 64 -99 SPO 1997 10 13 07 34 63 6.1 -9 678.20 -52.9 -49.9 -52.4 65 -99 SPO 1997 10 13 07 35 64 5.9 -9 678.20 -52.8 -49.8 -52.3 64 -99 SPO 1997 10 13 07 36 65 5.8 -9 678.20 -52.8 -49.9 -52.2 64 -99 SPO 1997 10 13 07 37 65 5.6 -9 678.20 -52.8 -50.0 -52.2 64 -99 SPO 1997 10 13 07 38 67 5.6 -9 678.20 -52.8 -50.1 -52.2 65 -99 SPO 1997 10 13 07 39 67 5.4 -9 678.20 -52.8 -50.0 -52.2 65 -99 SPO 1997 10 13 07 40 68 5.5 -9 678.20 -52.8 -50.0 -52.2 65 -99 SPO 1997 10 13 07 41 69 5.4 -9 678.30 -52.8 -50.2 -52.1 64 -99 SPO 1997 10 13 07 42 69 5.3 -9 678.20 -52.9 -50.2 -52.1 65 -99 SPO 1997 10 13 07 43 70 5.4 -9 678.20 -52.9 -50.2 -52.1 64 -99 SPO 1997 10 13 07 44 70 5.4 -9 678.20 -53.0 -50.4 -52.1 64 -99 SPO 1997 10 13 07 45 70 5.3 -9 678.20 -53.0 -50.6 -52.1 64 -99 SPO 1997 10 13 07 46 69 5.2 -9 678.30 -53.0 -50.5 -52.1 64 -99 SPO 1997 10 13 07 47 69 5.3 -9 678.30 -53.0 -50.5 -52.2 64 -99 SPO 1997 10 13 07 48 68 5.4 -9 678.20 -53.1 -50.3 -52.2 65 -99 SPO 1997 10 13 07 49 68 5.5 -9 678.30 -53.1 -50.4 -52.2 65 -99 SPO 1997 10 13 07 50 67 5.3 -9 678.30 -53.0 -50.4 -52.2 64 -99 SPO 1997 10 13 07 51 66 5.3 -9 678.30 -53.0 -50.4 -52.2 64 -99 SPO 1997 10 13 07 52 65 5.4 -9 678.30 -53.1 -50.3 -52.3 65 -99 SPO 1997 10 13 07 53 65 5.5 -9 678.30 -53.1 -50.3 -52.4 65 -99 SPO 1997 10 13 07 54 64 5.5 -9 678.30 -53.2 -50.2 -52.5 65 -99 SPO 1997 10 13 07 55 64 5.7 -9 678.30 -53.2 -49.9 -52.5 64 -99 SPO 1997 10 13 07 56 63 5.7 -9 678.30 -53.2 -49.6 -52.5 64 -99 SPO 1997 10 13 07 57 64 5.9 -9 678.30 -53.3 -49.5 -52.5 64 -99 SPO 1997 10 13 07 58 65 6.0 -9 678.30 -53.3 -49.4 -52.5 64 -99 SPO 1997 10 13 07 59 65 5.9 -9 678.30 -53.2 -49.3 -52.5 64 -99 SPO 1997 10 13 08 00 65 5.8 -9 678.30 -53.2 -49.4 -52.5 64 0 SPO 1997 10 13 08 01 65 5.7 -9 678.30 -53.2 -49.5 -52.6 64 -99 SPO 1997 10 13 08 02 65 5.6 -9 678.30 -53.4 -49.5 -52.7 66 -99 SPO 1997 10 13 08 03 66 5.7 -9 678.30 -53.5 -49.5 -52.9 66 -99 SPO 1997 10 13 08 04 68 5.8 -9 678.30 -53.5 -49.6 -52.8 66 -99 SPO 1997 10 13 08 05 69 5.9 -9 678.30 -53.4 -49.8 -52.8 64 -99 SPO 1997 10 13 08 06 69 6.0 -9 678.30 -53.4 -49.9 -52.7 64 -99 SPO 1997 10 13 08 07 69 5.7 -9 678.30 -53.3 -50.0 -52.6 63 -99 SPO 1997 10 13 08 08 70 5.5 -9 678.40 -53.3 -50.0 -52.6 63 -99 SPO 1997 10 13 08 09 71 5.4 -9 678.40 -53.4 -50.0 -52.6 64 -99 SPO 1997 10 13 08 10 70 5.4 -9 678.40 -53.5 -49.9 -52.8 65 -99 SPO 1997 10 13 08 11 71 5.4 -9 678.40 -53.5 -49.9 -52.9 64 -99 SPO 1997 10 13 08 12 72 5.5 -9 678.40 -53.6 -49.8 -53.0 66 -99 SPO 1997 10 13 08 13 71 5.6 -9 678.40 -53.6 -49.9 -53.1 65 -99 SPO 1997 10 13 08 14 71 5.6 -9 678.30 -53.7 -50.1 -53.2 66 -99 SPO 1997 10 13 08 15 73 5.6 -9 678.30 -53.8 -50.1 -53.2 66 -99 SPO 1997 10 13 08 16 74 5.3 -9 678.30 -53.8 -50.1 -53.2 65 -99 SPO 1997 10 13 08 17 72 5.1 -9 678.30 -53.8 -50.2 -53.2 65 -99 SPO 1997 10 13 08 18 69 4.8 -9 678.30 -54.0 -50.4 -53.4 66 -99 SPO 1997 10 13 08 19 68 5.1 -9 678.30 -54.1 -50.3 -53.6 66 -99 SPO 1997 10 13 08 20 70 5.5 -9 678.30 -54.1 -50.0 -53.6 65 -99 SPO 1997 10 13 08 21 69 5.6 -9 678.30 -54.0 -50.0 -53.6 63 -99 SPO 1997 10 13 08 22 70 5.6 -9 678.30 -53.9 -50.0 -53.4 63 -99 SPO 1997 10 13 08 23 70 5.5 -9 678.30 -53.8 -50.0 -53.4 63 -99 SPO 1997 10 13 08 24 70 5.4 -9 678.30 -53.6 -50.0 -53.2 63 -99 SPO 1997 10 13 08 25 70 5.5 -9 678.30 -53.6 -50.0 -53.2 64 -99 SPO 1997 10 13 08 26 70 5.4 -9 678.30 -53.5 -49.9 -53.1 64 -99 SPO 1997 10 13 08 27 69 5.4 -9 678.30 -53.5 -49.9 -53.1 64 -99 SPO 1997 10 13 08 28 68 5.6 -9 678.30 -53.4 -49.9 -53.0 64 -99 SPO 1997 10 13 08 29 66 5.6 -9 678.30 -53.4 -49.8 -53.1 64 -99 SPO 1997 10 13 08 30 65 5.7 -9 678.30 -53.4 -49.7 -53.1 64 -99 SPO 1997 10 13 08 31 64 5.9 -9 678.30 -53.5 -49.7 -53.2 65 -99 SPO 1997 10 13 08 32 63 6.1 -9 678.30 -53.5 -49.7 -53.2 64 -99 SPO 1997 10 13 08 33 63 5.9 -9 678.30 -53.4 -49.7 -53.2 64 -99 SPO 1997 10 13 08 34 62 6.1 -9 678.30 -53.4 -49.7 -53.2 64 -99 SPO 1997 10 13 08 35 62 5.8 -9 678.30 -53.4 -49.8 -53.1 64 -99 SPO 1997 10 13 08 36 62 5.8 -9 678.30 -53.4 -49.9 -53.1 64 -99 SPO 1997 10 13 08 37 59 5.9 -9 678.30 -53.4 -49.9 -53.1 64 -99 SPO 1997 10 13 08 38 60 5.9 -9 678.30 -53.5 -49.9 -53.1 65 -99 SPO 1997 10 13 08 39 59 6.0 -9 678.30 -53.4 -49.9 -53.1 64 -99 SPO 1997 10 13 08 40 59 6.2 -9 678.30 -53.4 -49.9 -53.2 65 -99 SPO 1997 10 13 08 41 59 6.2 -9 678.30 -53.4 -49.8 -53.0 65 -99 SPO 1997 10 13 08 42 59 6.4 -9 678.30 -53.2 -49.8 -53.0 64 -99 SPO 1997 10 13 08 43 59 6.5 -9 678.30 -53.2 -49.6 -52.9 64 -99 SPO 1997 10 13 08 44 59 6.4 -9 678.20 -53.2 -49.6 -52.9 64 -99 SPO 1997 10 13 08 45 59 6.5 -9 678.20 -53.1 -49.6 -52.9 64 -99 SPO 1997 10 13 08 46 59 6.5 -9 678.20 -53.1 -49.4 -52.9 64 -99 SPO 1997 10 13 08 47 59 6.6 -9 678.20 -53.1 -49.3 -52.8 64 -99 SPO 1997 10 13 08 48 59 6.6 -9 678.20 -53.0 -49.4 -52.7 65 -99 SPO 1997 10 13 08 49 59 6.3 -9 678.20 -52.9 -49.4 -52.6 65 -99 SPO 1997 10 13 08 50 60 6.5 -9 678.20 -53.0 -49.5 -52.6 66 -99 SPO 1997 10 13 08 51 59 6.3 -9 678.20 -52.8 -49.3 -52.5 65 -99 SPO 1997 10 13 08 52 59 6.1 -9 678.20 -52.8 -49.4 -52.6 65 -99 SPO 1997 10 13 08 53 58 6.1 -9 678.30 -52.9 -49.4 -52.6 67 -99 SPO 1997 10 13 08 54 60 5.8 -9 678.30 -52.8 -49.5 -52.6 66 -99 SPO 1997 10 13 08 55 60 5.8 -9 678.30 -52.8 -49.5 -52.5 65 -99 SPO 1997 10 13 08 56 63 5.7 -9 678.30 -52.6 -49.7 -52.3 64 -99 SPO 1997 10 13 08 57 64 5.7 -9 678.30 -52.6 -49.8 -52.2 64 -99 SPO 1997 10 13 08 58 64 5.2 -9 678.30 -52.6 -50.0 -52.2 65 -99 SPO 1997 10 13 08 59 66 4.8 -9 678.30 -52.6 -50.0 -52.2 65 -99 SPO 1997 10 13 09 00 67 4.9 -9 678.30 -52.7 -50.0 -52.2 66 0 SPO 1997 10 13 09 01 67 4.6 -9 678.30 -52.8 -50.0 -52.2 68 -99 SPO 1997 10 13 09 02 69 4.8 -9 678.30 -52.9 -49.9 -52.2 68 -99 SPO 1997 10 13 09 03 69 4.7 -9 678.40 -52.9 -49.8 -52.2 68 -99 SPO 1997 10 13 09 04 70 4.8 -9 678.40 -53.0 -49.8 -52.2 68 -99 SPO 1997 10 13 09 05 69 4.7 -9 678.40 -53.1 -49.8 -52.3 68 -99 SPO 1997 10 13 09 06 70 4.8 -9 678.40 -53.2 -49.8 -52.4 68 -99 SPO 1997 10 13 09 07 68 5.1 -9 678.40 -53.2 -49.7 -52.5 67 -99 SPO 1997 10 13 09 08 67 5.0 -9 678.40 -53.2 -49.7 -52.6 66 -99 SPO 1997 10 13 09 09 65 5.0 -9 678.40 -53.1 -49.8 -52.6 64 -99 SPO 1997 10 13 09 10 65 4.9 -9 678.40 -53.1 -49.8 -52.6 65 -99 SPO 1997 10 13 09 11 63 5.1 -9 678.30 -53.4 -49.7 -52.8 68 -99 SPO 1997 10 13 09 12 61 5.2 -9 678.30 -53.5 -49.7 -53.0 68 -99 SPO 1997 10 13 09 13 61 5.4 -9 678.30 -53.4 -49.7 -52.9 67 -99 SPO 1997 10 13 09 14 59 5.7 -9 678.30 -53.5 -49.5 -53.0 67 -99 SPO 1997 10 13 09 15 58 5.9 -9 678.20 -53.6 -49.5 -53.2 68 -99 SPO 1997 10 13 09 16 57 5.9 -9 678.30 -53.6 -49.4 -53.2 67 -99 SPO 1997 10 13 09 17 57 5.7 -9 678.30 -53.5 -49.5 -53.0 66 -99 SPO 1997 10 13 09 18 55 5.7 -9 678.30 -53.7 -49.5 -53.2 67 -99 SPO 1997 10 13 09 19 55 5.6 -9 678.30 -53.6 -49.6 -53.2 65 -99 SPO 1997 10 13 09 20 56 5.6 -9 678.30 -53.7 -49.6 -53.2 66 -99 SPO 1997 10 13 09 21 56 5.7 -9 678.20 -53.6 -49.6 -53.1 64 -99 SPO 1997 10 13 09 22 56 5.8 -9 678.20 -53.4 -49.7 -53.0 63 -99 SPO 1997 10 13 09 23 57 5.9 -9 678.20 -53.5 -49.7 -53.1 64 -99 SPO 1997 10 13 09 24 57 6.1 -9 678.20 -53.6 -49.6 -53.2 64 -99 SPO 1997 10 13 09 25 56 6.0 -9 678.20 -53.5 -49.6 -53.2 64 -99 SPO 1997 10 13 09 26 58 5.5 -9 678.20 -53.4 -49.8 -53.2 64 -99 SPO 1997 10 13 09 27 59 5.6 -9 678.20 -53.8 -49.8 -53.3 67 -99 SPO 1997 10 13 09 28 57 5.6 -9 678.30 -53.6 -49.7 -53.2 65 -99 SPO 1997 10 13 09 29 57 5.4 -9 678.30 -53.4 -49.6 -53.0 64 -99 SPO 1997 10 13 09 30 58 5.2 -9 678.30 -53.6 -49.7 -53.0 66 -99 SPO 1997 10 13 09 31 58 5.4 -9 678.30 -53.7 -49.6 -53.1 66 -99 SPO 1997 10 13 09 32 56 5.6 -9 678.20 -53.6 -49.5 -53.0 65 -99 SPO 1997 10 13 09 33 56 5.5 -9 678.20 -53.4 -49.5 -52.8 64 -99 SPO 1997 10 13 09 34 56 5.4 -9 678.20 -53.4 -49.6 -52.9 64 -99 SPO 1997 10 13 09 35 55 5.5 -9 678.20 -53.4 -49.5 -52.8 65 -99 SPO 1997 10 13 09 36 54 5.6 -9 678.20 -53.4 -49.4 -52.8 65 -99 SPO 1997 10 13 09 37 54 5.4 -9 678.20 -53.2 -49.5 -52.8 64 -99 SPO 1997 10 13 09 38 54 5.2 -9 678.20 -53.2 -49.6 -52.8 65 -99 SPO 1997 10 13 09 39 54 5.0 -9 678.20 -53.4 -49.7 -52.8 67 -99 SPO 1997 10 13 09 40 53 4.9 -9 678.20 -53.4 -49.8 -52.9 67 -99 SPO 1997 10 13 09 41 53 4.8 -9 678.20 -53.5 -49.8 -52.9 68 -99 SPO 1997 10 13 09 42 53 4.8 -9 678.20 -53.6 -49.9 -53.1 68 -99 SPO 1997 10 13 09 43 53 4.7 -9 678.20 -53.8 -49.9 -53.2 70 -99 SPO 1997 10 13 09 44 54 4.9 -9 678.20 -53.9 -49.8 -53.2 69 -99 SPO 1997 10 13 09 45 54 5.0 -9 678.20 -53.9 -49.8 -53.3 67 -99 SPO 1997 10 13 09 46 55 5.2 -9 678.20 -53.8 -49.8 -53.3 67 -99 SPO 1997 10 13 09 47 53 4.7 -9 678.20 -53.7 -49.8 -53.2 65 -99 SPO 1997 10 13 09 48 54 4.5 -9 678.20 -53.8 -50.0 -53.3 66 -99 SPO 1997 10 13 09 49 54 4.3 -9 678.20 -54.0 -49.9 -53.4 67 -99 SPO 1997 10 13 09 50 53 4.5 -9 678.20 -54.0 -49.8 -53.3 67 -99 SPO 1997 10 13 09 51 52 4.5 -9 678.20 -53.8 -49.7 -53.1 65 -99 SPO 1997 10 13 09 52 52 4.6 -9 678.20 -53.4 -49.6 -52.8 63 -99 SPO 1997 10 13 09 53 52 4.6 -9 678.20 -53.3 -49.6 -52.7 64 -99 SPO 1997 10 13 09 54 52 4.4 -9 678.20 -53.4 -49.6 -52.7 65 -99 SPO 1997 10 13 09 55 52 4.5 -9 678.20 -53.2 -49.7 -52.6 65 -99 SPO 1997 10 13 09 56 54 4.5 -9 678.20 -53.1 -49.6 -52.5 65 -99 SPO 1997 10 13 09 57 54 4.4 -9 678.20 -53.2 -49.6 -52.5 66 -99 SPO 1997 10 13 09 58 53 5.0 -9 678.20 -53.3 -49.6 -52.6 68 -99 SPO 1997 10 13 09 59 53 5.0 -9 678.20 -53.0 -49.5 -52.4 65 -99 SPO 1997 10 13 10 00 53 4.9 -9 678.20 -53.0 -49.6 -52.3 66 0 SPO 1997 10 13 10 01 55 4.7 -9 678.20 -53.0 -49.6 -52.3 67 -99 SPO 1997 10 13 10 02 54 4.8 -9 678.20 -53.2 -49.5 -52.4 68 -99 SPO 1997 10 13 10 03 55 4.7 -9 678.20 -53.2 -49.5 -52.4 69 -99 SPO 1997 10 13 10 04 55 4.9 -9 678.20 -53.3 -49.5 -52.5 69 -99 SPO 1997 10 13 10 05 51 5.1 -9 678.10 -53.4 -49.3 -52.6 70 -99 SPO 1997 10 13 10 06 52 5.0 -9 678.10 -53.1 -49.4 -52.4 68 -99 SPO 1997 10 13 10 07 51 5.4 -9 678.10 -53.0 -49.4 -52.3 68 -99 SPO 1997 10 13 10 08 51 5.5 -9 678.10 -52.8 -49.3 -52.2 67 -99 SPO 1997 10 13 10 09 49 5.7 -9 678.10 -52.8 -49.2 -52.2 68 -99 SPO 1997 10 13 10 10 49 5.5 -9 678.10 -52.6 -49.2 -52.0 67 -99 SPO 1997 10 13 10 11 50 5.6 -9 678.10 -52.4 -49.2 -51.8 65 -99 SPO 1997 10 13 10 12 49 5.5 -9 678.10 -52.3 -49.1 -51.6 65 -99 SPO 1997 10 13 10 13 49 5.4 -9 678.10 -52.3 -49.1 -51.6 66 -99 SPO 1997 10 13 10 14 48 5.7 -9 678.10 -52.2 -49.2 -51.6 66 -99 SPO 1997 10 13 10 15 50 5.6 -9 678.10 -52.0 -49.1 -51.4 66 -99 SPO 1997 10 13 10 16 48 5.5 -9 678.10 -52.0 -49.1 -51.4 67 -99 SPO 1997 10 13 10 17 50 5.2 -9 678.10 -52.0 -49.3 -51.3 69 -99 SPO 1997 10 13 10 18 51 5.5 -9 678.10 -52.0 -49.2 -51.3 69 -99 SPO 1997 10 13 10 19 51 5.6 -9 678.10 -52.1 -49.1 -51.4 70 -99 SPO 1997 10 13 10 20 50 5.7 -9 678.10 -52.0 -49.0 -51.3 71 -99 SPO 1997 10 13 10 21 52 5.6 -9 678.10 -51.9 -49.1 -51.3 70 -99 SPO 1997 10 13 10 22 52 5.4 -9 678.10 -52.0 -49.2 -51.3 71 -99 SPO 1997 10 13 10 23 52 5.5 -9 678.10 -52.1 -49.2 -51.3 72 -99 SPO 1997 10 13 10 24 49 5.8 -9 678.00 -52.0 -49.1 -51.2 70 -99 SPO 1997 10 13 10 25 49 6.1 -9 678.00 -51.8 -49.1 -51.1 67 -99 SPO 1997 10 13 10 26 49 6.2 -9 678.00 -51.8 -49.0 -51.1 68 -99 SPO 1997 10 13 10 27 48 6.5 -9 678.00 -51.8 -49.0 -51.1 70 -99 SPO 1997 10 13 10 28 47 6.2 -9 678.00 -51.6 -48.9 -51.0 68 -99 SPO 1997 10 13 10 29 46 6.0 -9 678.00 -51.7 -49.0 -51.0 70 -99 SPO 1997 10 13 10 30 47 6.1 -9 678.00 -51.7 -49.0 -51.0 70 -99 SPO 1997 10 13 10 31 46 6.0 -9 678.00 -51.8 -49.1 -51.1 71 -99 SPO 1997 10 13 10 32 47 6.0 -9 678.00 -51.8 -49.0 -51.2 70 -99 SPO 1997 10 13 10 33 46 6.0 -9 678.00 -51.9 -49.1 -51.2 71 -99 SPO 1997 10 13 10 34 46 5.9 -9 678.00 -51.9 -49.1 -51.2 71 -99 SPO 1997 10 13 10 35 47 5.6 -9 678.10 -51.8 -49.1 -51.2 70 -99 SPO 1997 10 13 10 36 47 5.6 -9 678.10 -51.9 -49.2 -51.2 70 -99 SPO 1997 10 13 10 37 47 5.7 -9 678.10 -51.9 -49.2 -51.1 70 -99 SPO 1997 10 13 10 38 48 5.6 -9 678.10 -51.8 -49.1 -51.1 68 -99 SPO 1997 10 13 10 39 49 5.0 -9 678.10 -51.8 -49.2 -51.1 70 -99 SPO 1997 10 13 10 40 49 5.2 -9 678.10 -51.8 -49.3 -51.1 70 -99 SPO 1997 10 13 10 41 50 5.1 -9 678.00 -51.7 -49.2 -51.0 69 -99 SPO 1997 10 13 10 42 48 4.8 -9 678.10 -51.7 -49.4 -50.9 70 -99 SPO 1997 10 13 10 43 49 4.9 -9 678.10 -51.6 -49.4 -50.8 69 -99 SPO 1997 10 13 10 44 50 4.5 -9 678.10 -51.5 -49.4 -50.7 69 -99 SPO 1997 10 13 10 45 51 4.2 -9 678.10 -51.6 -49.6 -50.7 70 -99 SPO 1997 10 13 10 46 52 4.4 -9 678.10 -51.5 -49.5 -50.7 70 -99 SPO 1997 10 13 10 47 53 4.4 -9 678.10 -51.5 -49.6 -50.6 70 -99 SPO 1997 10 13 10 48 53 4.5 -9 678.10 -51.5 -49.5 -50.6 70 -99 SPO 1997 10 13 10 49 54 4.4 -9 678.10 -51.4 -49.5 -50.6 69 -99 SPO 1997 10 13 10 50 53 4.4 -9 678.10 -51.4 -49.6 -50.6 69 -99 SPO 1997 10 13 10 51 52 4.4 -9 678.10 -51.5 -49.6 -50.6 69 -99 SPO 1997 10 13 10 52 53 4.8 -9 678.10 -51.5 -49.5 -50.6 69 -99 SPO 1997 10 13 10 53 52 4.9 -9 678.10 -51.4 -49.6 -50.6 69 -99 SPO 1997 10 13 10 54 49 5.0 -9 678.10 -51.4 -49.6 -50.6 70 -99 SPO 1997 10 13 10 55 48 5.2 -9 678.00 -51.4 -49.5 -50.6 70 -99 SPO 1997 10 13 10 56 47 5.3 -9 678.00 -51.4 -49.5 -50.6 70 -99 SPO 1997 10 13 10 57 47 5.4 -9 678.00 -51.5 -49.5 -50.6 70 -99 SPO 1997 10 13 10 58 47 5.8 -9 678.00 -51.4 -49.5 -50.6 70 -99 SPO 1997 10 13 10 59 46 5.8 -9 678.00 -51.4 -49.4 -50.5 70 -99 SPO 1997 10 13 11 00 46 5.8 -9 678.00 -51.3 -49.5 -50.5 70 0 SPO 1997 10 13 11 01 46 5.8 -9 678.00 -51.3 -49.4 -50.6 70 -99 SPO 1997 10 13 11 02 45 5.8 -9 678.00 -51.4 -49.5 -50.6 70 -99 SPO 1997 10 13 11 03 46 5.9 -9 678.00 -51.4 -49.5 -50.7 70 -99 SPO 1997 10 13 11 04 45 5.9 -9 678.00 -51.5 -49.5 -50.7 70 -99 SPO 1997 10 13 11 05 45 6.0 -9 678.00 -51.5 -49.5 -50.7 70 -99 SPO 1997 10 13 11 06 44 6.1 -9 678.00 -51.5 -49.5 -50.7 70 -99 SPO 1997 10 13 11 07 43 6.2 -9 678.00 -51.5 -49.4 -50.7 70 -99 SPO 1997 10 13 11 08 43 6.2 -9 678.00 -51.5 -49.4 -50.7 69 -99 SPO 1997 10 13 11 09 43 6.4 -9 678.00 -51.6 -49.3 -50.8 70 -99 SPO 1997 10 13 11 10 43 6.3 -9 678.00 -51.5 -49.3 -50.8 68 -99 SPO 1997 10 13 11 11 43 6.2 -9 678.00 -51.5 -49.3 -50.8 67 -99 SPO 1997 10 13 11 12 42 6.1 -9 678.00 -51.6 -49.4 -50.8 68 -99 SPO 1997 10 13 11 13 42 6.0 -9 678.00 -51.6 -49.5 -50.8 68 -99 SPO 1997 10 13 11 14 44 6.0 -9 678.00 -51.6 -49.5 -50.8 68 -99 SPO 1997 10 13 11 15 43 5.9 -9 678.00 -51.6 -49.5 -50.8 66 -99 SPO 1997 10 13 11 16 44 5.7 -9 678.00 -51.7 -49.5 -50.9 66 -99 SPO 1997 10 13 11 17 45 5.8 -9 678.00 -51.7 -49.5 -50.9 66 -99 SPO 1997 10 13 11 18 45 5.8 -9 678.00 -51.7 -49.5 -50.8 66 -99 SPO 1997 10 13 11 19 45 5.7 -9 678.00 -51.8 -49.5 -50.9 68 -99 SPO 1997 10 13 11 20 44 5.6 -9 678.00 -51.7 -49.5 -50.9 67 -99 SPO 1997 10 13 11 21 42 5.5 -9 678.00 -51.7 -49.5 -50.9 67 -99 SPO 1997 10 13 11 22 43 5.6 -9 678.00 -51.6 -49.5 -50.8 66 -99 SPO 1997 10 13 11 23 44 5.4 -9 678.00 -51.5 -49.5 -50.7 67 -99 SPO 1997 10 13 11 24 43 5.1 -9 678.10 -51.6 -49.6 -50.7 68 -99 SPO 1997 10 13 11 25 45 5.2 -9 678.10 -51.7 -49.6 -50.7 69 -99 SPO 1997 10 13 11 26 44 5.6 -9 678.10 -51.6 -49.4 -50.7 68 -99 SPO 1997 10 13 11 27 45 5.7 -9 678.00 -51.5 -49.4 -50.7 67 -99 SPO 1997 10 13 11 28 46 5.8 -9 678.00 -51.4 -49.4 -50.7 66 -99 SPO 1997 10 13 11 29 46 5.6 -9 678.00 -51.4 -49.4 -50.7 66 -99 SPO 1997 10 13 11 30 45 5.6 -9 678.00 -51.6 -49.4 -50.8 66 -99 SPO 1997 10 13 11 31 45 5.5 -9 678.00 -51.6 -49.5 -50.8 66 -99 SPO 1997 10 13 11 32 45 5.6 -9 678.00 -51.7 -49.5 -50.8 67 -99 SPO 1997 10 13 11 33 44 5.6 -9 678.00 -51.8 -49.5 -50.9 68 -99 SPO 1997 10 13 11 34 43 6.1 -9 678.00 -51.8 -49.5 -50.9 70 -99 SPO 1997 10 13 11 35 42 6.0 -9 678.00 -51.7 -49.4 -50.9 69 -99 SPO 1997 10 13 11 36 40 6.1 -9 678.00 -51.6 -49.5 -50.9 68 -99 SPO 1997 10 13 11 37 39 6.3 -9 678.00 -51.7 -49.4 -50.9 70 -99 SPO 1997 10 13 11 38 39 5.7 -9 678.00 -51.6 -49.4 -50.8 69 -99 SPO 1997 10 13 11 39 40 5.8 -9 678.00 -51.6 -49.4 -50.8 69 -99 SPO 1997 10 13 11 40 40 5.7 -9 678.00 -51.7 -49.4 -50.9 70 -99 SPO 1997 10 13 11 41 40 5.7 -9 678.00 -51.8 -49.4 -51.0 70 -99 SPO 1997 10 13 11 42 40 5.8 -9 678.00 -51.6 -49.4 -50.9 66 -99 SPO 1997 10 13 11 43 39 5.9 -9 678.00 -51.4 -49.5 -50.8 66 -99 SPO 1997 10 13 11 44 37 5.8 -9 678.00 -51.3 -49.4 -50.6 66 -99 SPO 1997 10 13 11 45 37 6.0 -9 678.00 -51.4 -49.3 -50.6 67 -99 SPO 1997 10 13 11 46 38 6.0 -9 678.00 -51.1 -49.2 -50.4 66 -99 SPO 1997 10 13 11 47 40 5.8 -9 678.10 -51.0 -49.3 -50.4 65 -99 SPO 1997 10 13 11 48 42 5.5 -9 678.10 -51.1 -49.3 -50.4 67 -99 SPO 1997 10 13 11 49 43 5.6 -9 678.10 -51.1 -49.4 -50.4 67 -99 SPO 1997 10 13 11 50 44 5.5 -9 678.20 -51.2 -49.4 -50.5 69 -99 SPO 1997 10 13 11 51 44 5.3 -9 678.20 -51.3 -49.4 -50.6 69 -99 SPO 1997 10 13 11 52 44 5.4 -9 678.20 -51.4 -49.5 -50.6 69 -99 SPO 1997 10 13 11 53 44 5.5 -9 678.20 -51.4 -49.5 -50.7 68 -99 SPO 1997 10 13 11 54 45 5.1 -9 678.20 -51.3 -49.6 -50.6 67 -99 SPO 1997 10 13 11 55 45 4.8 -9 678.20 -51.4 -49.7 -50.6 68 -99 SPO 1997 10 13 11 56 46 4.7 -9 678.20 -51.4 -49.8 -50.6 67 -99 SPO 1997 10 13 11 57 45 4.5 -9 678.20 -51.5 -49.9 -50.7 68 -99 SPO 1997 10 13 11 58 45 4.6 -9 678.20 -51.6 -50.0 -50.8 68 -99 SPO 1997 10 13 11 59 44 4.6 -9 678.20 -51.6 -50.1 -51.0 68 -99 SPO 1997 10 13 12 00 43 4.9 -9 678.20 -51.8 -50.0 -51.1 70 0 SPO 1997 10 13 12 01 42 5.1 -9 678.20 -51.8 -50.0 -51.1 68 -99 SPO 1997 10 13 12 02 42 5.3 -9 678.10 -51.8 -49.9 -51.2 67 -99 SPO 1997 10 13 12 03 42 5.4 -9 678.10 -51.8 -49.9 -51.3 67 -99 SPO 1997 10 13 12 04 43 5.6 -9 678.10 -51.8 -49.9 -51.3 67 -99 SPO 1997 10 13 12 05 43 5.7 -9 678.10 -51.8 -49.8 -51.2 67 -99 SPO 1997 10 13 12 06 43 5.7 -9 678.10 -51.8 -49.7 -51.2 66 -99 SPO 1997 10 13 12 07 43 5.7 -9 678.10 -51.7 -49.7 -51.2 65 -99 SPO 1997 10 13 12 08 45 5.5 -9 678.10 -51.8 -49.7 -51.2 66 -99 SPO 1997 10 13 12 09 45 5.3 -9 678.10 -51.7 -49.7 -51.2 65 -99 SPO 1997 10 13 12 10 46 5.3 -9 678.10 -51.8 -49.7 -51.3 65 -99 SPO 1997 10 13 12 11 47 5.2 -9 678.10 -51.8 -49.7 -51.4 65 -99 SPO 1997 10 13 12 12 47 5.2 -9 678.10 -51.9 -49.8 -51.5 66 -99 SPO 1997 10 13 12 13 46 5.0 -9 678.10 -51.9 -49.9 -51.5 66 -99 SPO 1997 10 13 12 14 47 5.1 -9 678.10 -51.9 -49.9 -51.5 66 -99 SPO 1997 10 13 12 15 48 5.1 -9 678.10 -51.8 -49.8 -51.4 65 -99 SPO 1997 10 13 12 16 48 4.9 -9 678.10 -51.8 -49.7 -51.4 65 -99 SPO 1997 10 13 12 17 48 4.9 -9 678.10 -51.8 -49.6 -51.4 65 -99 SPO 1997 10 13 12 18 50 4.7 -9 678.10 -51.6 -49.6 -51.2 64 -99 SPO 1997 10 13 12 19 49 4.9 -9 678.10 -51.4 -49.6 -51.0 63 -99 SPO 1997 10 13 12 20 51 4.7 -9 678.20 -51.3 -49.7 -51.0 63 -99 SPO 1997 10 13 12 21 50 4.7 -9 678.20 -51.3 -49.7 -50.9 63 -99 SPO 1997 10 13 12 22 50 4.8 -9 678.20 -51.4 -49.7 -50.9 65 -99 SPO 1997 10 13 12 23 48 5.0 -9 678.10 -51.4 -49.6 -51.0 65 -99 SPO 1997 10 13 12 24 48 5.2 -9 678.20 -51.4 -49.6 -51.0 66 -99 SPO 1997 10 13 12 25 46 5.3 -9 678.10 -51.4 -49.5 -51.0 67 -99 SPO 1997 10 13 12 26 46 5.3 -9 678.10 -51.3 -49.5 -50.9 66 -99 SPO 1997 10 13 12 27 45 5.5 -9 678.10 -51.2 -49.5 -50.9 66 -99 SPO 1997 10 13 12 28 44 5.4 -9 678.10 -51.2 -49.4 -50.8 66 -99 SPO 1997 10 13 12 29 43 5.4 -9 678.10 -51.2 -49.4 -50.8 66 -99 SPO 1997 10 13 12 30 44 5.2 -9 678.10 -51.1 -49.4 -50.7 67 -99 SPO 1997 10 13 12 31 44 5.2 -9 678.20 -51.1 -49.4 -50.7 67 -99 SPO 1997 10 13 12 32 45 5.0 -9 678.20 -51.2 -49.5 -50.7 68 -99 SPO 1997 10 13 12 33 46 4.9 -9 678.20 -51.3 -49.5 -50.8 68 -99 SPO 1997 10 13 12 34 46 5.0 -9 678.20 -51.2 -49.6 -50.8 67 -99 SPO 1997 10 13 12 35 47 5.0 -9 678.20 -51.2 -49.5 -50.8 67 -99 SPO 1997 10 13 12 36 47 5.1 -9 678.20 -51.2 -49.6 -50.8 66 -99 SPO 1997 10 13 12 37 46 4.8 -9 678.20 -51.3 -49.6 -50.8 68 -99 SPO 1997 10 13 12 38 47 4.7 -9 678.20 -51.4 -49.6 -50.9 70 -99 SPO 1997 10 13 12 39 43 4.7 -9 678.20 -51.3 -49.6 -50.8 69 -99 SPO 1997 10 13 12 40 43 4.8 -9 678.20 -51.2 -49.6 -50.7 68 -99 SPO 1997 10 13 12 41 44 4.8 -9 678.30 -51.0 -49.6 -50.6 67 -99 SPO 1997 10 13 12 42 45 4.5 -9 678.30 -51.2 -49.6 -50.7 69 -99 SPO 1997 10 13 12 43 45 4.3 -9 678.30 -51.4 -49.6 -50.8 70 -99 SPO 1997 10 13 12 44 45 4.2 -9 678.30 -51.5 -49.7 -50.8 70 -99 SPO 1997 10 13 12 45 46 4.4 -9 678.20 -51.6 -49.7 -50.9 71 -99 SPO 1997 10 13 12 46 46 4.7 -9 678.20 -51.5 -49.6 -50.9 69 -99 SPO 1997 10 13 12 47 44 4.7 -9 678.20 -51.3 -49.6 -50.8 67 -99 SPO 1997 10 13 12 48 44 4.9 -9 678.20 -51.3 -49.5 -50.8 67 -99 SPO 1997 10 13 12 49 42 5.1 -9 678.20 -51.1 -49.5 -50.6 66 -99 SPO 1997 10 13 12 50 43 5.3 -9 678.20 -50.9 -49.5 -50.5 66 -99 SPO 1997 10 13 12 51 44 5.3 -9 678.20 -51.1 -49.4 -50.6 68 -99 SPO 1997 10 13 12 52 42 5.5 -9 678.20 -51.2 -49.5 -50.8 70 -99 SPO 1997 10 13 12 53 43 5.6 -9 678.20 -51.3 -49.5 -50.8 70 -99 SPO 1997 10 13 12 54 43 5.7 -9 678.10 -51.2 -49.5 -50.8 68 -99 SPO 1997 10 13 12 55 41 5.7 -9 678.10 -51.2 -49.5 -50.8 68 -99 SPO 1997 10 13 12 56 40 5.6 -9 678.10 -51.3 -49.5 -50.8 69 -99 SPO 1997 10 13 12 57 38 5.7 -9 678.10 -51.3 -49.5 -50.9 68 -99 SPO 1997 10 13 12 58 38 5.8 -9 678.10 -51.4 -49.5 -50.9 69 -99 SPO 1997 10 13 12 59 38 5.8 -9 678.10 -51.4 -49.5 -50.9 68 -99 SPO 1997 10 13 13 00 39 5.7 -9 678.10 -51.3 -49.4 -50.9 66 0 SPO 1997 10 13 13 01 40 5.8 -9 678.10 -51.4 -49.5 -51.0 67 -99 SPO 1997 10 13 13 02 40 5.7 -9 678.10 -51.4 -49.5 -51.0 67 -99 SPO 1997 10 13 13 03 42 5.5 -9 678.10 -51.4 -49.6 -51.0 67 -99 SPO 1997 10 13 13 04 41 5.6 -9 678.10 -51.5 -49.6 -51.1 68 -99 SPO 1997 10 13 13 05 42 5.6 -9 678.10 -51.4 -49.6 -51.0 67 -99 SPO 1997 10 13 13 06 42 5.6 -9 678.10 -51.4 -49.6 -51.1 67 -99 SPO 1997 10 13 13 07 41 5.5 -9 678.10 -51.5 -49.6 -51.1 67 -99 SPO 1997 10 13 13 08 41 5.4 -9 678.10 -51.5 -49.6 -51.1 67 -99 SPO 1997 10 13 13 09 40 5.4 -9 678.10 -51.5 -49.7 -51.1 67 -99 SPO 1997 10 13 13 10 40 5.5 -9 678.10 -51.5 -49.7 -51.2 67 -99 SPO 1997 10 13 13 11 40 5.7 -9 678.10 -51.6 -49.6 -51.2 68 -99 SPO 1997 10 13 13 12 40 5.8 -9 678.00 -51.6 -49.6 -51.2 66 -99 SPO 1997 10 13 13 13 39 5.8 -9 678.00 -51.5 -49.7 -51.2 65 -99 SPO 1997 10 13 13 14 39 5.7 -9 678.00 -51.5 -49.6 -51.2 65 -99 SPO 1997 10 13 13 15 39 5.9 -9 678.00 -51.5 -49.7 -51.2 65 -99 SPO 1997 10 13 13 16 39 6.0 -9 678.00 -51.5 -49.6 -51.1 65 -99 SPO 1997 10 13 13 17 40 5.8 -9 678.00 -51.5 -49.6 -51.1 65 -99 SPO 1997 10 13 13 18 41 5.6 -9 678.00 -51.6 -49.6 -51.2 66 -99 SPO 1997 10 13 13 19 41 5.3 -9 678.00 -51.6 -49.6 -51.2 66 -99 SPO 1997 10 13 13 20 42 5.0 -9 678.10 -51.6 -49.8 -51.2 66 -99 SPO 1997 10 13 13 21 42 4.8 -9 678.10 -51.7 -49.8 -51.2 66 -99 SPO 1997 10 13 13 22 43 4.8 -9 678.10 -51.7 -49.8 -51.2 66 -99 SPO 1997 10 13 13 23 45 4.5 -9 678.10 -51.7 -49.9 -51.2 66 -99 SPO 1997 10 13 13 24 46 4.3 -9 678.10 -51.8 -49.9 -51.2 66 -99 SPO 1997 10 13 13 25 48 3.9 -9 678.10 -51.9 -50.0 -51.3 66 -99 SPO 1997 10 13 13 26 50 3.7 -9 678.20 -52.0 -50.2 -51.3 66 -99 SPO 1997 10 13 13 27 50 3.6 -9 678.20 -52.2 -50.2 -51.4 65 -99 SPO 1997 10 13 13 28 51 3.5 -9 678.20 -52.3 -50.2 -51.5 65 -99 SPO 1997 10 13 13 29 52 3.5 -9 678.20 -52.4 -50.3 -51.5 65 -99 SPO 1997 10 13 13 30 52 3.4 -9 678.20 -52.4 -50.4 -51.5 65 -99 SPO 1997 10 13 13 31 51 3.2 -9 678.20 -52.5 -50.4 -51.5 65 -99 SPO 1997 10 13 13 32 52 3.2 -9 678.30 -52.6 -50.4 -51.5 65 -99 SPO 1997 10 13 13 33 53 3.4 -9 678.30 -52.6 -50.4 -51.5 65 -99 SPO 1997 10 13 13 34 51 3.4 -9 678.30 -52.8 -50.4 -51.6 66 -99 SPO 1997 10 13 13 35 50 3.7 -9 678.20 -52.8 -50.4 -51.8 65 -99 SPO 1997 10 13 13 36 49 3.9 -9 678.20 -52.8 -50.3 -51.8 65 -99 SPO 1997 10 13 13 37 47 4.2 -9 678.20 -52.9 -50.2 -52.0 66 -99 SPO 1997 10 13 13 38 46 4.6 -9 678.20 -53.0 -50.3 -52.1 66 -99 SPO 1997 10 13 13 39 45 4.8 -9 678.10 -53.1 -50.2 -52.2 67 -99 SPO 1997 10 13 13 40 43 4.8 -9 678.10 -53.1 -50.1 -52.2 66 -99 SPO 1997 10 13 13 41 42 5.0 -9 678.10 -53.1 -50.0 -52.1 66 -99 SPO 1997 10 13 13 42 43 5.2 -9 678.10 -53.0 -50.0 -52.1 64 -99 SPO 1997 10 13 13 43 44 5.1 -9 678.10 -53.0 -50.0 -52.2 64 -99 SPO 1997 10 13 13 44 44 5.0 -9 678.20 -52.9 -50.1 -52.1 64 -99 SPO 1997 10 13 13 45 45 4.9 -9 678.20 -52.9 -50.0 -52.2 65 -99 SPO 1997 10 13 13 46 46 4.5 -9 678.20 -53.0 -50.1 -52.3 65 -99 SPO 1997 10 13 13 47 48 4.3 -9 678.30 -53.1 -50.2 -52.4 66 -99 SPO 1997 10 13 13 48 50 4.2 -9 678.30 -53.2 -50.3 -52.4 66 -99 SPO 1997 10 13 13 49 51 4.2 -9 678.30 -53.4 -50.4 -52.6 67 -99 SPO 1997 10 13 13 50 53 4.1 -9 678.20 -53.4 -50.6 -52.6 66 -99 SPO 1997 10 13 13 51 55 4.0 -9 678.20 -53.5 -50.6 -52.7 66 -99 SPO 1997 10 13 13 52 54 4.3 -9 678.20 -53.7 -50.6 -52.8 66 -99 SPO 1997 10 13 13 53 52 4.2 -9 678.20 -53.7 -50.6 -52.9 64 -99 SPO 1997 10 13 13 54 52 4.2 -9 678.20 -53.8 -50.6 -53.0 64 -99 SPO 1997 10 13 13 55 51 4.3 -9 678.30 -53.8 -50.6 -53.1 64 -99 SPO 1997 10 13 13 56 51 4.2 -9 678.20 -53.8 -50.6 -53.1 64 -99 SPO 1997 10 13 13 57 51 4.4 -9 678.30 -53.8 -50.5 -53.1 64 -99 SPO 1997 10 13 13 58 51 4.5 -9 678.30 -53.7 -50.4 -53.0 64 -99 SPO 1997 10 13 13 59 51 4.4 -9 678.20 -53.7 -50.4 -53.1 64 -99 SPO 1997 10 13 14 00 53 4.3 -9 678.30 -53.7 -50.4 -53.1 64 0 SPO 1997 10 13 14 01 55 4.2 -9 678.30 -53.8 -50.5 -53.1 65 -99 SPO 1997 10 13 14 02 56 4.2 -9 678.30 -53.8 -50.5 -53.2 64 -99 SPO 1997 10 13 14 03 57 4.5 -9 678.30 -54.0 -50.4 -53.2 66 -99 SPO 1997 10 13 14 04 59 4.3 -9 678.30 -54.0 -50.4 -53.3 65 -99 SPO 1997 10 13 14 05 58 4.3 -9 678.30 -54.2 -50.6 -53.4 66 -99 SPO 1997 10 13 14 06 59 3.8 -9 678.20 -54.5 -50.7 -53.6 66 -99 SPO 1997 10 13 14 07 59 3.7 -9 678.30 -54.8 -50.8 -53.8 66 -99 SPO 1997 10 13 14 08 57 3.7 -9 678.30 -55.0 -50.8 -53.9 65 -99 SPO 1997 10 13 14 09 57 3.7 -9 678.30 -55.0 -50.9 -54.0 63 -99 SPO 1997 10 13 14 10 57 3.7 -9 678.30 -55.0 -50.9 -54.0 63 -99 SPO 1997 10 13 14 11 56 3.7 -9 678.30 -55.0 -50.8 -54.0 63 -99 SPO 1997 10 13 14 12 58 3.5 -9 678.30 -55.0 -50.9 -54.0 62 -99 SPO 1997 10 13 14 13 59 3.5 -9 678.30 -54.9 -50.9 -54.0 62 -99 SPO 1997 10 13 14 14 59 4.0 -9 678.30 -54.8 -50.9 -54.0 62 -99 SPO 1997 10 13 14 15 60 3.9 -9 678.20 -54.6 -50.9 -54.0 61 -99 SPO 1997 10 13 14 16 58 4.2 -9 678.20 -54.4 -50.9 -53.9 60 -99 SPO 1997 10 13 14 17 58 4.1 -9 678.20 -54.4 -50.8 -53.9 62 -99 SPO 1997 10 13 14 18 61 3.7 -9 678.20 -54.4 -50.9 -53.9 62 -99 SPO 1997 10 13 14 19 61 4.1 -9 678.20 -54.5 -51.0 -54.0 63 -99 SPO 1997 10 13 14 20 60 4.5 -9 678.20 -54.4 -50.8 -54.0 62 -99 SPO 1997 10 13 14 21 60 4.6 -9 678.20 -54.3 -50.6 -53.9 62 -99 SPO 1997 10 13 14 22 58 4.8 -9 678.10 -54.3 -50.5 -53.9 63 -99 SPO 1997 10 13 14 23 59 4.5 -9 678.10 -54.3 -50.6 -53.9 63 -99 SPO 1997 10 13 14 24 60 4.3 -9 678.10 -54.2 -50.7 -53.9 63 -99 SPO 1997 10 13 14 25 58 4.4 -9 678.20 -54.2 -50.6 -53.8 64 -99 SPO 1997 10 13 14 26 60 4.1 -9 678.20 -54.0 -50.8 -53.7 63 -99 SPO 1997 10 13 14 27 62 3.9 -9 678.20 -53.9 -50.8 -53.6 63 -99 SPO 1997 10 13 14 28 67 3.3 -9 678.20 -53.9 -50.9 -53.5 64 -99 SPO 1997 10 13 14 29 70 3.2 -9 678.20 -54.0 -51.0 -53.4 66 -99 SPO 1997 10 13 14 30 69 3.5 -9 678.20 -54.0 -51.0 -53.4 66 -99 SPO 1997 10 13 14 31 68 3.4 -9 678.20 -54.2 -51.0 -53.4 67 -99 SPO 1997 10 13 14 32 69 3.3 -9 678.20 -54.4 -51.0 -53.5 67 -99 SPO 1997 10 13 14 33 67 3.5 -9 678.20 -54.6 -51.0 -53.6 68 -99 SPO 1997 10 13 14 34 65 3.7 -9 678.20 -54.6 -51.0 -53.7 66 -99 SPO 1997 10 13 14 35 64 3.4 -9 678.20 -54.6 -50.9 -53.7 65 -99 SPO 1997 10 13 14 36 61 3.5 -9 678.20 -54.7 -50.9 -53.8 66 -99 SPO 1997 10 13 14 37 57 3.7 -9 678.20 -54.8 -50.8 -54.0 66 -99 SPO 1997 10 13 14 38 54 3.9 -9 678.20 -54.8 -50.7 -54.0 66 -99 SPO 1997 10 13 14 39 54 3.9 -9 678.20 -54.8 -50.7 -54.0 66 -99 SPO 1997 10 13 14 40 53 4.2 -9 678.20 -54.7 -50.6 -53.9 64 -99 SPO 1997 10 13 14 41 52 4.2 -9 678.20 -54.5 -50.5 -53.8 63 -99 SPO 1997 10 13 14 42 54 3.9 -9 678.20 -54.3 -50.5 -53.6 62 -99 SPO 1997 10 13 14 43 57 3.8 -9 678.20 -54.4 -50.5 -53.4 63 -99 SPO 1997 10 13 14 44 58 3.7 -9 678.20 -54.5 -50.6 -53.3 63 -99 SPO 1997 10 13 14 45 57 3.5 -9 678.20 -54.5 -50.7 -53.2 63 -99 SPO 1997 10 13 14 46 56 3.5 -9 678.20 -54.4 -50.9 -53.1 62 -99 SPO 1997 10 13 14 47 56 3.6 -9 678.20 -54.4 -50.8 -53.1 63 -99 SPO 1997 10 13 14 48 57 3.6 -9 678.20 -54.4 -50.8 -53.1 63 -99 SPO 1997 10 13 14 49 57 3.8 -9 678.20 -54.3 -50.8 -53.0 63 -99 SPO 1997 10 13 14 50 55 3.8 -9 678.20 -54.2 -50.7 -52.9 63 -99 SPO 1997 10 13 14 51 54 3.9 -9 678.20 -54.2 -50.6 -53.0 65 -99 SPO 1997 10 13 14 52 54 4.0 -9 678.20 -54.1 -50.6 -53.0 65 -99 SPO 1997 10 13 14 53 54 4.1 -9 678.20 -54.0 -50.5 -52.9 64 -99 SPO 1997 10 13 14 54 54 4.3 -9 678.20 -53.9 -50.5 -52.8 64 -99 SPO 1997 10 13 14 55 55 4.2 -9 678.20 -53.7 -50.4 -52.7 64 -99 SPO 1997 10 13 14 56 57 4.1 -9 678.20 -53.5 -50.4 -52.6 64 -99 SPO 1997 10 13 14 57 60 4.0 -9 678.20 -53.4 -50.5 -52.4 64 -99 SPO 1997 10 13 14 58 63 3.8 -9 678.20 -53.6 -50.6 -52.3 66 -99 SPO 1997 10 13 14 59 65 3.7 -9 678.20 -53.9 -50.8 -52.3 67 -99 SPO 1997 10 13 15 00 67 3.5 -9 678.20 -54.2 -50.8 -52.3 68 0 SPO 1997 10 13 15 01 67 3.5 -9 678.20 -54.5 -51.0 -52.4 69 -99 SPO 1997 10 13 15 02 67 3.6 -9 678.20 -54.8 -51.0 -52.6 67 -99 SPO 1997 10 13 15 03 66 3.6 -9 678.10 -55.0 -51.0 -52.7 67 -99 SPO 1997 10 13 15 04 65 3.6 -9 678.10 -55.0 -50.9 -52.8 66 -99 SPO 1997 10 13 15 05 62 3.6 -9 678.20 -55.1 -50.9 -52.9 65 -99 SPO 1997 10 13 15 06 60 3.6 -9 678.20 -55.0 -50.8 -52.8 64 -99 SPO 1997 10 13 15 07 60 3.9 -9 678.20 -54.9 -50.7 -52.8 63 -99 SPO 1997 10 13 15 08 60 3.9 -9 678.20 -54.8 -50.7 -52.8 62 -99 SPO 1997 10 13 15 09 61 3.9 -9 678.20 -54.8 -50.8 -52.8 63 -99 SPO 1997 10 13 15 10 61 3.7 -9 678.20 -54.6 -50.8 -52.8 63 -99 SPO 1997 10 13 15 11 62 3.7 -9 678.20 -54.6 -50.8 -52.7 63 -99 SPO 1997 10 13 15 12 63 3.6 -9 678.20 -54.5 -50.8 -52.6 63 -99 SPO 1997 10 13 15 13 64 3.5 -9 678.20 -54.4 -50.8 -52.6 62 -99 SPO 1997 10 13 15 14 64 3.4 -9 678.20 -54.6 -50.9 -52.6 63 -99 SPO 1997 10 13 15 15 66 3.2 -9 678.20 -54.8 -50.9 -52.6 64 -99 SPO 1997 10 13 15 16 66 3.2 -9 678.20 -55.2 -50.9 -53.0 66 -99 SPO 1997 10 13 15 17 66 3.2 -9 678.20 -55.5 -51.0 -53.4 67 -99 SPO 1997 10 13 15 18 65 3.4 -9 678.20 -55.6 -51.0 -53.8 66 -99 SPO 1997 10 13 15 19 64 3.6 -9 678.20 -55.8 -51.0 -53.8 67 -99 SPO 1997 10 13 15 20 60 3.7 -9 678.10 -55.8 -50.8 -53.6 65 -99 SPO 1997 10 13 15 21 58 3.7 -9 678.10 -55.9 -50.7 -53.5 65 -99 SPO 1997 10 13 15 22 56 3.7 -9 678.10 -55.9 -50.6 -53.5 63 -99 SPO 1997 10 13 15 23 55 3.8 -9 678.10 -55.8 -50.5 -53.4 62 -99 SPO 1997 10 13 15 24 54 3.6 -9 678.10 -55.8 -50.4 -53.4 62 -99 SPO 1997 10 13 15 25 55 3.7 -9 678.10 -55.7 -50.5 -53.4 61 -99 SPO 1997 10 13 15 26 55 3.9 -9 678.10 -55.5 -50.5 -53.3 60 -99 SPO 1997 10 13 15 27 54 4.0 -9 678.10 -55.4 -50.5 -53.3 60 -99 SPO 1997 10 13 15 28 53 4.0 -9 678.10 -55.5 -50.4 -53.5 62 -99 SPO 1997 10 13 15 29 52 4.2 -9 678.10 -55.4 -50.4 -53.5 61 -99 SPO 1997 10 13 15 30 52 4.4 -9 678.10 -55.2 -50.2 -53.6 59 -99 SPO 1997 10 13 15 31 50 4.4 -9 678.10 -55.2 -50.2 -53.7 61 -99 SPO 1997 10 13 15 32 50 4.5 -9 678.00 -55.1 -50.2 -53.7 61 -99 SPO 1997 10 13 15 33 49 4.6 -9 678.00 -55.2 -50.2 -53.8 62 -99 SPO 1997 10 13 15 34 48 4.5 -9 678.00 -55.3 -50.2 -53.9 63 -99 SPO 1997 10 13 15 35 48 4.6 -9 678.00 -55.4 -50.1 -53.9 64 -99 SPO 1997 10 13 15 36 47 4.8 -9 678.00 -55.2 -50.0 -53.8 63 -99 SPO 1997 10 13 15 37 48 4.8 -9 678.10 -54.9 -50.0 -53.6 62 -99 SPO 1997 10 13 15 38 50 4.7 -9 678.10 -54.6 -50.0 -53.4 60 -99 SPO 1997 10 13 15 39 51 4.8 -9 678.10 -54.4 -49.9 -53.3 60 -99 SPO 1997 10 13 15 40 51 4.6 -9 678.10 -54.4 -49.9 -53.3 62 -99 SPO 1997 10 13 15 41 51 4.6 -9 678.10 -54.2 -50.0 -53.2 60 -99 SPO 1997 10 13 15 42 52 4.2 -9 678.10 -54.2 -50.1 -53.1 61 -99 SPO 1997 10 13 15 43 52 4.2 -9 678.10 -54.3 -50.2 -53.0 63 -99 SPO 1997 10 13 15 44 53 4.0 -9 678.10 -54.4 -50.3 -53.0 64 -99 SPO 1997 10 13 15 45 55 3.9 -9 678.10 -54.4 -50.3 -53.0 66 -99 SPO 1997 10 13 15 46 55 3.8 -9 678.10 -54.5 -50.4 -52.9 67 -99 SPO 1997 10 13 15 47 56 3.5 -9 678.10 -54.6 -50.4 -52.9 68 -99 SPO 1997 10 13 15 48 58 3.4 -9 678.10 -54.7 -50.5 -52.9 68 -99 SPO 1997 10 13 15 49 58 3.1 -9 678.10 -54.7 -50.6 -52.9 66 -99 SPO 1997 10 13 15 50 60 3.1 -9 678.10 -54.7 -50.7 -52.8 66 -99 SPO 1997 10 13 15 51 57 3.0 -9 678.10 -54.9 -50.7 -52.8 68 -99 SPO 1997 10 13 15 52 58 3.4 -9 678.10 -54.9 -50.6 -52.7 67 -99 SPO 1997 10 13 15 53 58 3.4 -9 678.10 -54.9 -50.5 -52.7 66 -99 SPO 1997 10 13 15 54 55 3.4 -9 678.10 -54.8 -50.4 -52.7 65 -99 SPO 1997 10 13 15 55 53 3.8 -9 678.10 -54.8 -50.4 -52.8 64 -99 SPO 1997 10 13 15 56 52 4.0 -9 678.10 -54.8 -50.3 -53.0 64 -99 SPO 1997 10 13 15 57 51 4.4 -9 678.00 -54.9 -50.2 -53.3 65 -99 SPO 1997 10 13 15 58 51 4.6 -9 678.00 -55.0 -50.1 -53.5 65 -99 SPO 1997 10 13 15 59 51 4.8 -9 678.00 -54.9 -50.1 -53.5 64 -99 SPO 1997 10 13 16 00 52 5.1 -9 678.00 -55.0 -50.1 -53.7 65 0 SPO 1997 10 13 16 01 52 5.2 -9 677.90 -55.2 -50.0 -53.9 66 -99 SPO 1997 10 13 16 02 51 5.1 -9 677.90 -55.0 -50.0 -53.8 64 -99 SPO 1997 10 13 16 03 51 4.9 -9 678.00 -55.0 -50.1 -53.8 65 -99 SPO 1997 10 13 16 04 53 4.8 -9 678.00 -55.0 -50.1 -53.7 66 -99 SPO 1997 10 13 16 05 54 4.8 -9 678.00 -55.1 -50.1 -53.8 66 -99 SPO 1997 10 13 16 06 54 4.6 -9 678.00 -55.1 -50.1 -53.8 66 -99 SPO 1997 10 13 16 07 53 4.3 -9 678.00 -55.1 -50.2 -53.8 66 -99 SPO 1997 10 13 16 08 54 4.2 -9 678.00 -55.0 -50.3 -53.7 65 -99 SPO 1997 10 13 16 09 55 4.1 -9 678.00 -55.0 -50.4 -53.6 65 -99 SPO 1997 10 13 16 10 54 4.0 -9 678.00 -55.2 -50.4 -53.7 66 -99 SPO 1997 10 13 16 11 53 4.2 -9 678.00 -55.4 -50.4 -53.8 66 -99 SPO 1997 10 13 16 12 52 4.3 -9 678.00 -55.4 -50.4 -53.9 66 -99 SPO 1997 10 13 16 13 51 4.3 -9 678.00 -55.4 -50.4 -53.9 65 -99 SPO 1997 10 13 16 14 50 4.5 -9 678.00 -55.2 -50.3 -53.8 64 -99 SPO 1997 10 13 16 15 50 4.3 -9 678.00 -55.0 -50.3 -53.8 63 -99 SPO 1997 10 13 16 16 52 4.2 -9 678.00 -55.0 -50.3 -53.7 64 -99 SPO 1997 10 13 16 17 52 3.9 -9 678.00 -55.0 -50.4 -53.6 65 -99 SPO 1997 10 13 16 18 54 3.7 -9 678.00 -55.0 -50.4 -53.5 65 -99 SPO 1997 10 13 16 19 54 3.7 -9 678.00 -55.1 -50.5 -53.4 66 -99 SPO 1997 10 13 16 20 57 3.7 -9 678.00 -55.2 -50.5 -53.3 66 -99 SPO 1997 10 13 16 21 58 3.6 -9 678.00 -55.3 -50.5 -53.3 65 -99 SPO 1997 10 13 16 22 57 3.6 -9 678.00 -55.4 -50.6 -53.3 65 -99 SPO 1997 10 13 16 23 56 3.7 -9 678.00 -55.4 -50.6 -53.3 65 -99 SPO 1997 10 13 16 24 55 3.7 -9 678.00 -55.2 -50.6 -53.3 62 -99 SPO 1997 10 13 16 25 55 3.7 -9 678.00 -55.0 -50.6 -53.2 61 -99 SPO 1997 10 13 16 26 55 3.7 -9 678.00 -55.0 -50.7 -53.2 62 -99 SPO 1997 10 13 16 27 55 3.6 -9 678.00 -55.0 -50.7 -53.2 63 -99 SPO 1997 10 13 16 28 55 3.7 -9 678.00 -55.1 -50.7 -53.3 65 -99 SPO 1997 10 13 16 29 54 3.6 -9 678.00 -55.1 -50.6 -53.3 65 -99 SPO 1997 10 13 16 30 54 3.7 -9 678.10 -55.2 -50.7 -53.3 66 -99 SPO 1997 10 13 16 31 54 3.7 -9 678.10 -55.2 -50.6 -53.2 65 -99 SPO 1997 10 13 16 32 53 3.7 -9 678.10 -55.1 -50.5 -53.2 64 -99 SPO 1997 10 13 16 33 52 3.5 -9 678.10 -55.1 -50.5 -53.2 64 -99 SPO 1997 10 13 16 34 53 3.5 -9 678.10 -55.2 -50.4 -53.1 65 -99 SPO 1997 10 13 16 35 53 3.3 -9 678.10 -55.3 -50.4 -53.1 65 -99 SPO 1997 10 13 16 36 52 3.2 -9 678.10 -55.4 -50.4 -53.1 65 -99 SPO 1997 10 13 16 37 54 3.3 -9 678.10 -55.5 -50.5 -53.2 65 -99 SPO 1997 10 13 16 38 55 3.2 -9 678.10 -55.6 -50.5 -53.2 64 -99 SPO 1997 10 13 16 39 54 3.1 -9 678.10 -55.7 -50.6 -53.4 64 -99 SPO 1997 10 13 16 40 54 3.2 -9 678.10 -55.7 -50.6 -53.5 63 -99 SPO 1997 10 13 16 41 56 3.1 -9 678.10 -55.6 -50.6 -53.4 62 -99 SPO 1997 10 13 16 42 56 3.6 -9 678.10 -55.5 -50.6 -53.4 62 -99 SPO 1997 10 13 16 43 58 3.9 -9 678.10 -55.4 -50.5 -53.4 62 -99 SPO 1997 10 13 16 44 58 3.9 -9 678.10 -55.2 -50.6 -53.4 62 -99 SPO 1997 10 13 16 45 58 4.1 -9 678.10 -55.0 -50.6 -53.3 61 -99 SPO 1997 10 13 16 46 57 4.3 -9 678.10 -54.8 -50.5 -53.3 61 -99 SPO 1997 10 13 16 47 55 4.6 -9 678.10 -54.6 -50.5 -53.3 61 -99 SPO 1997 10 13 16 48 56 4.2 -9 678.00 -54.6 -50.5 -53.3 63 -99 SPO 1997 10 13 16 49 54 4.5 -9 678.00 -54.4 -50.4 -53.3 62 -99 SPO 1997 10 13 16 50 53 4.6 -9 678.00 -54.5 -50.3 -53.4 63 -99 SPO 1997 10 13 16 51 52 4.8 -9 678.00 -54.6 -50.4 -53.5 64 -99 SPO 1997 10 13 16 52 52 5.0 -9 678.00 -54.6 -50.4 -53.5 64 -99 SPO 1997 10 13 16 53 51 5.0 -9 678.00 -54.6 -50.2 -53.6 65 -99 SPO 1997 10 13 16 54 50 5.0 -9 678.00 -54.6 -50.2 -53.5 66 -99 SPO 1997 10 13 16 55 51 5.0 -9 678.00 -54.6 -50.2 -53.5 66 -99 SPO 1997 10 13 16 56 51 5.1 -9 678.00 -54.7 -50.2 -53.6 68 -99 SPO 1997 10 13 16 57 50 5.2 -9 678.00 -54.6 -50.2 -53.6 67 -99 SPO 1997 10 13 16 58 52 5.1 -9 678.10 -54.6 -50.2 -53.6 67 -99 SPO 1997 10 13 16 59 53 4.9 -9 678.00 -54.6 -50.2 -53.5 68 -99 SPO 1997 10 13 17 00 54 4.7 -9 678.10 -54.6 -50.3 -53.5 68 0 SPO 1997 10 13 17 01 55 4.3 -9 678.10 -54.8 -50.4 -53.5 67 -99 SPO 1997 10 13 17 02 58 4.0 -9 678.10 -54.8 -50.6 -53.4 67 -99 SPO 1997 10 13 17 03 60 3.5 -9 678.20 -55.1 -50.8 -53.2 68 -99 SPO 1997 10 13 17 04 60 2.8 -9 678.20 -55.3 -51.0 -53.0 68 -99 SPO 1997 10 13 17 05 63 2.9 -9 678.20 -55.4 -51.2 -53.0 68 -99 SPO 1997 10 13 17 06 66 2.8 -9 678.20 -55.5 -51.2 -53.1 68 -99 SPO 1997 10 13 17 07 67 2.7 -9 678.20 -55.6 -51.1 -53.2 69 -99 SPO 1997 10 13 17 08 68 2.7 -9 678.20 -55.6 -51.0 -53.2 68 -99 SPO 1997 10 13 17 09 67 3.0 -9 678.20 -55.6 -51.0 -53.2 67 -99 SPO 1997 10 13 17 10 67 3.2 -9 678.20 -55.6 -50.9 -53.3 67 -99 SPO 1997 10 13 17 11 61 3.4 -9 678.10 -55.6 -50.8 -53.4 66 -99 SPO 1997 10 13 17 12 56 3.6 -9 678.10 -55.6 -50.7 -53.4 66 -99 SPO 1997 10 13 17 13 50 3.6 -9 678.10 -55.5 -50.7 -53.6 65 -99 SPO 1997 10 13 17 14 48 3.9 -9 678.10 -55.6 -50.6 -53.9 65 -99 SPO 1997 10 13 17 15 45 4.1 -9 678.10 -55.6 -50.6 -54.1 65 -99 SPO 1997 10 13 17 16 42 4.3 -9 678.10 -55.4 -50.6 -54.2 63 -99 SPO 1997 10 13 17 17 43 4.6 -9 678.00 -55.2 -50.5 -54.0 62 -99 SPO 1997 10 13 17 18 42 5.0 -9 678.00 -54.8 -50.1 -53.7 60 -99 SPO 1997 10 13 17 19 41 5.3 -9 678.00 -54.6 -50.0 -53.5 61 -99 SPO 1997 10 13 17 20 40 5.3 -9 678.00 -54.2 -50.1 -53.3 60 -99 SPO 1997 10 13 17 21 39 5.3 -9 678.00 -53.9 -50.0 -53.1 60 -99 SPO 1997 10 13 17 22 42 5.2 -9 678.00 -53.9 -50.1 -53.0 63 -99 SPO 1997 10 13 17 23 45 5.1 -9 678.00 -54.1 -50.0 -53.1 67 -99 SPO 1997 10 13 17 24 46 5.3 -9 678.00 -54.4 -50.1 -53.3 69 -99 SPO 1997 10 13 17 25 46 5.3 -9 678.00 -54.6 -50.2 -53.5 71 -99 SPO 1997 10 13 17 26 46 5.1 -9 678.00 -54.7 -50.2 -53.7 71 -99 SPO 1997 10 13 17 27 46 5.0 -9 678.00 -54.8 -50.2 -53.8 71 -99 SPO 1997 10 13 17 28 46 4.9 -9 678.00 -55.0 -50.2 -53.9 71 -99 SPO 1997 10 13 17 29 46 4.8 -9 678.10 -55.1 -50.2 -53.9 70 -99 SPO 1997 10 13 17 30 47 4.9 -9 678.10 -55.0 -50.2 -53.9 67 -99 SPO 1997 10 13 17 31 48 4.8 -9 678.10 -54.9 -50.3 -53.8 66 -99 SPO 1997 10 13 17 32 49 4.7 -9 678.10 -54.8 -50.4 -53.7 66 -99 SPO 1997 10 13 17 33 50 4.5 -9 678.10 -54.7 -50.4 -53.6 66 -99 SPO 1997 10 13 17 34 47 4.2 -9 678.10 -54.8 -50.4 -53.6 67 -99 SPO 1997 10 13 17 35 44 4.2 -9 678.10 -54.8 -50.4 -53.6 69 -99 SPO 1997 10 13 17 36 45 4.1 -9 678.10 -54.8 -50.4 -53.6 69 -99 SPO 1997 10 13 17 37 45 4.2 -9 678.10 -54.7 -50.3 -53.5 68 -99 SPO 1997 10 13 17 38 44 4.3 -9 678.10 -54.7 -50.3 -53.5 68 -99 SPO 1997 10 13 17 39 45 4.4 -9 678.10 -54.6 -50.3 -53.4 68 -99 SPO 1997 10 13 17 40 44 4.4 -9 678.10 -54.6 -50.3 -53.3 67 -99 SPO 1997 10 13 17 41 45 4.4 -9 678.10 -54.4 -50.2 -53.2 66 -99 SPO 1997 10 13 17 42 46 4.3 -9 678.10 -54.2 -50.3 -53.1 65 -99 SPO 1997 10 13 17 43 47 4.2 -9 678.00 -54.2 -50.4 -53.0 66 -99 SPO 1997 10 13 17 44 48 4.0 -9 678.00 -54.2 -50.4 -53.0 67 -99 SPO 1997 10 13 17 45 48 3.8 -9 678.00 -54.2 -50.6 -53.0 67 -99 SPO 1997 10 13 17 46 50 3.6 -9 678.10 -54.3 -50.7 -53.0 69 -99 SPO 1997 10 13 17 47 51 3.5 -9 678.10 -54.3 -50.8 -53.0 69 -99 SPO 1997 10 13 17 48 54 3.5 -9 678.10 -54.4 -50.9 -53.0 70 -99 SPO 1997 10 13 17 49 55 3.4 -9 678.10 -54.5 -51.0 -53.0 71 -99 SPO 1997 10 13 17 50 56 3.4 -9 678.10 -54.5 -51.0 -53.1 70 -99 SPO 1997 10 13 17 51 57 3.3 -9 678.10 -54.5 -51.1 -53.1 69 -99 SPO 1997 10 13 17 52 59 3.4 -9 678.10 -54.6 -51.1 -53.1 69 -99 SPO 1997 10 13 17 53 61 3.4 -9 678.10 -54.7 -51.2 -53.2 69 -99 SPO 1997 10 13 17 54 64 3.4 -9 678.10 -54.8 -51.2 -53.3 67 -99 SPO 1997 10 13 17 55 66 3.6 -9 678.10 -54.8 -51.2 -53.4 66 -99 SPO 1997 10 13 17 56 64 3.7 -9 678.10 -54.8 -51.3 -53.5 66 -99 SPO 1997 10 13 17 57 64 3.7 -9 678.10 -54.8 -51.4 -53.6 65 -99 SPO 1997 10 13 17 58 62 3.5 -9 678.10 -54.9 -51.5 -53.7 65 -99 SPO 1997 10 13 17 59 60 3.5 -9 678.10 -55.0 -51.4 -53.8 66 -99 SPO 1997 10 13 18 00 57 3.4 -9 678.10 -55.1 -51.4 -54.0 66 0 SPO 1997 10 13 18 01 54 3.4 -9 678.10 -55.2 -51.2 -54.2 66 -99 SPO 1997 10 13 18 02 52 3.5 -9 678.10 -55.3 -51.1 -54.2 66 -99 SPO 1997 10 13 18 03 49 3.8 -9 678.10 -55.3 -51.0 -54.3 65 -99 SPO 1997 10 13 18 04 48 3.8 -9 678.10 -55.3 -50.9 -54.4 65 -99 SPO 1997 10 13 18 05 47 3.9 -9 678.10 -55.3 -50.8 -54.4 65 -99 SPO 1997 10 13 18 06 48 4.0 -9 678.10 -55.3 -50.8 -54.4 65 -99 SPO 1997 10 13 18 07 49 4.0 -9 678.10 -55.3 -50.7 -54.4 65 -99 SPO 1997 10 13 18 08 50 4.0 -9 678.10 -55.3 -50.7 -54.4 65 -99 SPO 1997 10 13 18 09 50 4.0 -9 678.10 -55.4 -50.7 -54.4 65 -99 SPO 1997 10 13 18 10 51 4.0 -9 678.10 -55.6 -50.6 -54.4 65 -99 SPO 1997 10 13 18 11 51 4.1 -9 678.00 -55.7 -50.5 -54.6 65 -99 SPO 1997 10 13 18 12 51 4.2 -9 678.00 -55.7 -50.4 -54.5 65 -99 SPO 1997 10 13 18 13 51 4.5 -9 678.00 -55.8 -50.4 -54.6 65 -99 SPO 1997 10 13 18 14 51 4.6 -9 678.00 -56.0 -50.4 -54.7 65 -99 SPO 1997 10 13 18 15 52 4.8 -9 678.00 -55.9 -50.3 -54.8 64 -99 SPO 1997 10 13 18 16 52 4.9 -9 678.00 -55.8 -50.4 -54.8 63 -99 SPO 1997 10 13 18 17 53 4.9 -9 678.00 -55.9 -50.3 -54.9 63 -99 SPO 1997 10 13 18 18 54 4.9 -9 678.00 -55.9 -50.4 -54.9 63 -99 SPO 1997 10 13 18 19 54 4.9 -9 678.00 -55.7 -50.4 -54.8 61 -99 SPO 1997 10 13 18 20 55 4.9 -9 678.00 -55.6 -50.4 -54.8 61 -99 SPO 1997 10 13 18 21 56 4.9 -9 678.00 -55.6 -50.4 -54.7 62 -99 SPO 1997 10 13 18 22 56 5.2 -9 678.00 -55.5 -50.2 -54.6 62 -99 SPO 1997 10 13 18 23 56 5.0 -9 678.00 -55.6 -50.3 -54.6 63 -99 SPO 1997 10 13 18 24 57 5.0 -9 678.00 -55.7 -50.3 -54.6 65 -99 SPO 1997 10 13 18 25 57 5.0 -9 678.00 -55.7 -50.3 -54.7 65 -99 SPO 1997 10 13 18 26 59 5.1 -9 678.00 -55.7 -50.3 -54.7 65 -99 SPO 1997 10 13 18 27 60 5.1 -9 677.90 -55.6 -50.4 -54.6 65 -99 SPO 1997 10 13 18 28 61 5.1 -9 677.90 -55.5 -50.5 -54.6 65 -99 SPO 1997 10 13 18 29 61 5.2 -9 677.90 -55.5 -50.5 -54.6 65 -99 SPO 1997 10 13 18 30 60 5.1 -9 677.90 -55.4 -50.6 -54.5 65 -99 SPO 1997 10 13 18 31 61 5.1 -9 677.90 -55.4 -50.8 -54.4 65 -99 SPO 1997 10 13 18 32 62 5.1 -9 677.90 -55.2 -50.8 -54.4 64 -99 SPO 1997 10 13 18 33 63 5.2 -9 677.90 -55.2 -50.7 -54.4 64 -99 SPO 1997 10 13 18 34 63 5.2 -9 677.90 -55.2 -50.6 -54.3 65 -99 SPO 1997 10 13 18 35 64 5.1 -9 677.90 -55.2 -50.6 -54.2 65 -99 SPO 1997 10 13 18 36 66 5.0 -9 677.90 -55.1 -50.6 -54.2 65 -99 SPO 1997 10 13 18 37 67 5.0 -9 678.00 -55.2 -50.8 -54.2 66 -99 SPO 1997 10 13 18 38 66 4.9 -9 678.00 -55.2 -50.7 -54.0 66 -99 SPO 1997 10 13 18 39 67 4.9 -9 678.00 -55.0 -50.7 -53.9 65 -99 SPO 1997 10 13 18 40 69 4.8 -9 678.00 -55.1 -50.9 -53.9 66 -99 SPO 1997 10 13 18 41 71 4.8 -9 678.00 -55.1 -50.9 -53.8 66 -99 SPO 1997 10 13 18 42 70 4.8 -9 678.00 -55.0 -51.0 -53.8 66 -99 SPO 1997 10 13 18 43 71 4.7 -9 678.00 -55.1 -51.0 -53.8 67 -99 SPO 1997 10 13 18 44 74 4.6 -9 678.00 -55.1 -51.2 -53.9 67 -99 SPO 1997 10 13 18 45 73 4.6 -9 678.00 -55.3 -51.4 -53.9 68 -99 SPO 1997 10 13 18 46 74 4.7 -9 678.00 -55.4 -51.2 -54.0 67 -99 SPO 1997 10 13 18 47 73 4.6 -9 678.00 -55.4 -51.1 -54.0 66 -99 SPO 1997 10 13 18 48 73 4.7 -9 678.00 -55.6 -51.2 -54.1 68 -99 SPO 1997 10 13 18 49 73 4.3 -9 678.00 -55.7 -51.1 -54.1 68 -99 SPO 1997 10 13 18 50 76 4.3 -9 678.00 -55.7 -51.2 -54.1 67 -99 SPO 1997 10 13 18 51 76 4.3 -9 678.00 -55.8 -51.2 -54.0 68 -99 SPO 1997 10 13 18 52 78 4.1 -9 678.00 -55.7 -51.1 -54.1 66 -99 SPO 1997 10 13 18 53 76 4.2 -9 678.00 -55.6 -51.3 -54.0 65 -99 SPO 1997 10 13 18 54 75 4.5 -9 678.00 -55.6 -51.4 -54.0 65 -99 SPO 1997 10 13 18 55 74 4.8 -9 678.00 -55.7 -51.3 -54.2 66 -99 SPO 1997 10 13 18 56 71 5.0 -9 678.00 -55.7 -51.0 -54.2 65 -99 SPO 1997 10 13 18 57 69 4.9 -9 678.00 -55.7 -50.9 -54.2 65 -99 SPO 1997 10 13 18 58 68 4.8 -9 678.00 -55.7 -50.8 -54.3 65 -99 SPO 1997 10 13 18 59 69 4.8 -9 678.00 -55.7 -50.9 -54.4 65 -99 SPO 1997 10 13 19 00 69 4.9 -9 678.00 -55.7 -51.1 -54.4 65 0 SPO 1997 10 13 19 01 70 4.9 -9 678.00 -55.7 -51.0 -54.4 65 -99 SPO 1997 10 13 19 02 72 4.8 -9 678.00 -55.8 -50.9 -54.3 66 -99 SPO 1997 10 13 19 03 73 4.6 -9 678.00 -55.9 -51.0 -54.4 66 -99 SPO 1997 10 13 19 04 73 4.6 -9 678.00 -55.9 -50.9 -54.4 66 -99 SPO 1997 10 13 19 05 73 4.8 -9 678.00 -55.9 -50.8 -54.3 66 -99 SPO 1997 10 13 19 06 73 4.8 -9 678.00 -55.8 -50.6 -54.3 65 -99 SPO 1997 10 13 19 07 71 4.8 -9 678.00 -55.8 -50.6 -54.3 65 -99 SPO 1997 10 13 19 08 70 4.9 -9 678.00 -55.8 -50.7 -54.3 65 -99 SPO 1997 10 13 19 09 68 5.0 -9 678.00 -55.8 -50.7 -54.3 65 -99 SPO 1997 10 13 19 10 65 5.1 -9 678.00 -55.8 -50.6 -54.4 65 -99 SPO 1997 10 13 19 11 62 5.1 -9 678.00 -55.8 -50.5 -54.5 65 -99 SPO 1997 10 13 19 12 61 5.2 -9 678.00 -55.8 -50.4 -54.6 65 -99 SPO 1997 10 13 19 13 58 5.2 -9 678.00 -55.8 -50.3 -54.7 65 -99 SPO 1997 10 13 19 14 56 5.3 -9 678.00 -55.7 -50.3 -54.6 65 -99 SPO 1997 10 13 19 15 56 5.2 -9 678.00 -55.5 -50.4 -54.4 65 -99 SPO 1997 10 13 19 16 55 5.2 -9 678.00 -55.5 -50.5 -54.4 65 -99 SPO 1997 10 13 19 17 57 5.0 -9 678.00 -55.0 -50.5 -54.1 63 -99 SPO 1997 10 13 19 18 60 4.7 -9 678.00 -54.8 -50.6 -53.9 64 -99 SPO 1997 10 13 19 19 63 4.7 -9 678.00 -54.7 -50.7 -53.8 65 -99 SPO 1997 10 13 19 20 64 4.8 -9 678.00 -54.6 -50.9 -53.8 66 -99 SPO 1997 10 13 19 21 62 4.7 -9 678.00 -55.0 -51.0 -54.0 71 -99 SPO 1997 10 13 19 22 62 4.6 -9 678.00 -55.4 -51.1 -54.2 72 -99 SPO 1997 10 13 19 23 61 4.9 -9 678.00 -55.5 -50.8 -54.3 72 -99 SPO 1997 10 13 19 24 59 5.0 -9 678.00 -55.3 -50.6 -54.2 70 -99 SPO 1997 10 13 19 25 56 5.2 -9 678.00 -55.0 -50.6 -54.0 67 -99 SPO 1997 10 13 19 26 57 5.1 -9 678.00 -54.9 -50.5 -53.9 67 -99 SPO 1997 10 13 19 27 57 5.1 -9 678.00 -54.8 -50.6 -53.8 69 -99 SPO 1997 10 13 19 28 59 4.9 -9 678.00 -54.7 -50.5 -53.8 69 -99 SPO 1997 10 13 19 29 57 5.2 -9 678.00 -54.8 -50.5 -53.8 70 -99 SPO 1997 10 13 19 30 59 5.0 -9 678.00 -54.6 -50.5 -53.7 69 -99 SPO 1997 10 13 19 31 61 5.0 -9 678.00 -54.5 -50.6 -53.6 68 -99 SPO 1997 10 13 19 32 62 5.0 -9 678.00 -54.5 -50.7 -53.6 68 -99 SPO 1997 10 13 19 33 63 4.7 -9 678.00 -54.4 -50.8 -53.5 68 -99 SPO 1997 10 13 19 34 66 4.6 -9 678.00 -54.4 -51.0 -53.5 68 -99 SPO 1997 10 13 19 35 65 5.0 -9 678.00 -54.5 -50.9 -53.5 69 -99 SPO 1997 10 13 19 36 63 5.2 -9 678.00 -54.5 -50.8 -53.5 68 -99 SPO 1997 10 13 19 37 63 5.1 -9 678.00 -54.5 -50.8 -53.5 68 -99 SPO 1997 10 13 19 38 63 5.1 -9 678.00 -54.5 -50.8 -53.6 68 -99 SPO 1997 10 13 19 39 61 5.0 -9 678.00 -54.5 -50.8 -53.6 68 -99 SPO 1997 10 13 19 40 61 5.0 -9 678.00 -54.6 -50.8 -53.6 69 -99 SPO 1997 10 13 19 41 63 5.0 -9 678.00 -54.6 -50.8 -53.5 70 -99 SPO 1997 10 13 19 42 64 5.0 -9 678.00 -54.5 -50.9 -53.5 69 -99 SPO 1997 10 13 19 43 65 5.0 -9 677.90 -54.4 -51.0 -53.4 68 -99 SPO 1997 10 13 19 44 64 5.0 -9 677.90 -54.3 -50.9 -53.3 69 -99 SPO 1997 10 13 19 45 63 4.9 -9 677.90 -54.2 -50.9 -53.3 68 -99 SPO 1997 10 13 19 46 63 4.9 -9 677.90 -54.3 -51.0 -53.4 70 -99 SPO 1997 10 13 19 47 64 5.0 -9 677.90 -54.5 -51.1 -53.5 71 -99 SPO 1997 10 13 19 48 63 5.2 -9 677.90 -54.6 -51.0 -53.6 71 -99 SPO 1997 10 13 19 49 60 5.1 -9 677.90 -54.5 -50.9 -53.6 69 -99 SPO 1997 10 13 19 50 59 5.2 -9 677.90 -54.6 -50.7 -53.7 69 -99 SPO 1997 10 13 19 51 56 5.1 -9 677.90 -54.7 -50.7 -53.7 69 -99 SPO 1997 10 13 19 52 56 5.0 -9 677.90 -54.8 -50.8 -53.8 70 -99 SPO 1997 10 13 19 53 56 5.0 -9 677.90 -55.0 -50.8 -53.9 71 -99 SPO 1997 10 13 19 54 54 5.0 -9 677.90 -55.0 -50.9 -54.0 71 -99 SPO 1997 10 13 19 55 52 5.0 -9 677.90 -55.2 -50.8 -54.0 71 -99 SPO 1997 10 13 19 56 50 4.9 -9 677.90 -55.2 -51.0 -54.0 71 -99 SPO 1997 10 13 19 57 50 4.8 -9 677.90 -55.0 -51.0 -53.9 68 -99 SPO 1997 10 13 19 58 51 4.7 -9 677.90 -54.7 -51.1 -53.7 66 -99 SPO 1997 10 13 19 59 54 4.7 -9 677.90 -54.6 -51.2 -53.5 66 -99 SPO 1997 10 13 20 00 55 4.8 -9 677.90 -54.7 -51.0 -53.6 68 0 SPO 1997 10 13 20 01 53 5.0 -9 677.90 -55.0 -51.1 -53.9 71 -99 SPO 1997 10 13 20 02 52 5.0 -9 677.90 -55.1 -51.2 -54.0 70 -99 SPO 1997 10 13 20 03 51 5.1 -9 677.90 -55.0 -51.0 -54.0 68 -99 SPO 1997 10 13 20 04 50 5.2 -9 677.90 -55.0 -50.9 -54.0 68 -99 SPO 1997 10 13 20 05 49 5.4 -9 677.90 -55.0 -50.8 -53.9 69 -99 SPO 1997 10 13 20 06 48 5.3 -9 677.90 -54.8 -50.7 -53.8 67 -99 SPO 1997 10 13 20 07 47 5.4 -9 677.90 -54.7 -50.6 -53.7 66 -99 SPO 1997 10 13 20 08 47 5.3 -9 677.90 -54.6 -50.6 -53.7 67 -99 SPO 1997 10 13 20 09 50 5.0 -9 677.90 -54.6 -50.6 -53.7 68 -99 SPO 1997 10 13 20 10 52 4.8 -9 677.90 -54.8 -50.6 -53.7 69 -99 SPO 1997 10 13 20 11 57 4.7 -9 677.90 -54.9 -50.7 -53.8 68 -99 SPO 1997 10 13 20 12 60 4.3 -9 678.00 -55.1 -51.0 -53.9 69 -99 SPO 1997 10 13 20 13 62 4.2 -9 678.00 -55.2 -51.2 -54.0 69 -99 SPO 1997 10 13 20 14 64 4.1 -9 678.00 -55.5 -51.3 -54.1 70 -99 SPO 1997 10 13 20 15 63 4.1 -9 678.00 -55.7 -51.4 -54.2 70 -99 SPO 1997 10 13 20 16 61 4.3 -9 678.00 -55.8 -51.4 -54.4 69 -99 SPO 1997 10 13 20 17 61 4.4 -9 678.00 -55.8 -51.2 -54.6 69 -99 SPO 1997 10 13 20 18 60 4.5 -9 678.00 -55.8 -51.2 -54.6 68 -99 SPO 1997 10 13 20 19 59 4.6 -9 678.00 -55.8 -51.1 -54.7 67 -99 SPO 1997 10 13 20 20 60 4.5 -9 678.00 -55.8 -51.1 -54.7 68 -99 SPO 1997 10 13 20 21 62 4.7 -9 678.00 -55.7 -51.0 -54.7 67 -99 SPO 1997 10 13 20 22 61 4.7 -9 678.00 -55.6 -50.8 -54.6 67 -99 SPO 1997 10 13 20 23 61 4.8 -9 678.00 -55.5 -50.8 -54.6 66 -99 SPO 1997 10 13 20 24 60 4.8 -9 678.00 -55.5 -50.8 -54.6 66 -99 SPO 1997 10 13 20 25 60 5.0 -9 678.00 -55.4 -50.8 -54.5 65 -99 SPO 1997 10 13 20 26 60 4.8 -9 678.00 -55.3 -50.6 -54.5 64 -99 SPO 1997 10 13 20 27 61 5.0 -9 678.00 -55.2 -50.6 -54.5 64 -99 SPO 1997 10 13 20 28 63 5.1 -9 678.00 -55.2 -50.6 -54.4 64 -99 SPO 1997 10 13 20 29 63 5.0 -9 678.00 -55.1 -50.5 -54.4 64 -99 SPO 1997 10 13 20 30 63 4.8 -9 678.00 -55.0 -50.6 -54.4 64 -99 SPO 1997 10 13 20 31 63 4.7 -9 678.00 -55.1 -50.7 -54.4 65 -99 SPO 1997 10 13 20 32 63 4.7 -9 678.00 -55.2 -50.8 -54.4 66 -99 SPO 1997 10 13 20 33 64 4.7 -9 678.10 -55.2 -50.8 -54.4 67 -99 SPO 1997 10 13 20 34 66 4.5 -9 678.10 -55.2 -50.8 -54.4 67 -99 SPO 1997 10 13 20 35 67 4.5 -9 678.10 -55.3 -50.8 -54.5 68 -99 SPO 1997 10 13 20 36 68 4.4 -9 678.10 -55.2 -50.9 -54.4 67 -99 SPO 1997 10 13 20 37 69 4.4 -9 678.10 -55.3 -51.1 -54.5 67 -99 SPO 1997 10 13 20 38 66 4.6 -9 678.10 -55.4 -51.0 -54.5 67 -99 SPO 1997 10 13 20 39 65 4.8 -9 678.10 -55.3 -50.7 -54.6 65 -99 SPO 1997 10 13 20 40 64 4.7 -9 678.10 -55.3 -50.7 -54.6 65 -99 SPO 1997 10 13 20 41 63 4.8 -9 678.10 -55.4 -50.6 -54.7 66 -99 SPO 1997 10 13 20 42 62 4.7 -9 678.10 -55.4 -50.6 -54.8 66 -99 SPO 1997 10 13 20 43 62 4.7 -9 678.10 -55.4 -50.7 -54.8 66 -99 SPO 1997 10 13 20 44 62 4.7 -9 678.10 -55.4 -50.7 -54.8 66 -99 SPO 1997 10 13 20 45 62 4.7 -9 678.10 -55.4 -50.7 -54.9 65 -99 SPO 1997 10 13 20 46 61 4.9 -9 678.10 -55.5 -50.7 -54.9 66 -99 SPO 1997 10 13 20 47 58 5.1 -9 678.10 -55.4 -50.8 -54.8 65 -99 SPO 1997 10 13 20 48 57 5.0 -9 678.10 -55.3 -50.7 -54.8 65 -99 SPO 1997 10 13 20 49 57 5.0 -9 678.10 -55.3 -50.5 -54.8 65 -99 SPO 1997 10 13 20 50 57 5.2 -9 678.10 -55.3 -50.2 -54.8 65 -99 SPO 1997 10 13 20 51 57 5.0 -9 678.10 -55.3 -50.0 -54.8 65 -99 SPO 1997 10 13 20 52 56 5.0 -9 678.10 -55.3 -50.0 -54.8 65 -99 SPO 1997 10 13 20 53 55 5.0 -9 678.00 -55.3 -50.1 -54.8 65 -99 SPO 1997 10 13 20 54 53 5.5 -9 678.10 -55.2 -50.1 -54.7 65 -99 SPO 1997 10 13 20 55 53 5.0 -9 678.10 -54.9 -49.9 -54.6 63 -99 SPO 1997 10 13 20 56 53 4.3 -9 678.10 -55.0 -50.3 -54.6 65 -99 SPO 1997 10 13 20 57 55 4.7 -9 678.10 -55.1 -50.4 -54.6 66 -99 SPO 1997 10 13 20 58 54 4.7 -9 678.10 -55.0 -50.2 -54.6 66 -99 SPO 1997 10 13 20 59 55 4.6 -9 678.10 -55.0 -50.4 -54.5 66 -99 SPO 1997 10 13 21 00 56 4.8 -9 678.10 -54.9 -50.0 -54.4 66 0 SPO 1997 10 13 21 01 55 4.7 -9 678.10 -55.0 -50.1 -54.5 66 -99 SPO 1997 10 13 21 02 55 4.8 -9 678.10 -54.9 -50.3 -54.5 66 -99 SPO 1997 10 13 21 03 55 4.8 -9 678.10 -55.0 -50.2 -54.5 66 -99 SPO 1997 10 13 21 04 55 5.1 -9 678.00 -54.9 -50.3 -54.4 65 -99 SPO 1997 10 13 21 05 55 4.8 -9 678.00 -55.0 -50.1 -54.4 66 -99 SPO 1997 10 13 21 06 57 4.9 -9 678.00 -55.0 -49.7 -54.4 66 -99 SPO 1997 10 13 21 07 56 4.4 -9 678.10 -55.0 -50.0 -54.4 66 -99 SPO 1997 10 13 21 08 60 4.5 -9 678.10 -55.0 -50.3 -54.4 67 -99 SPO 1997 10 13 21 09 62 4.4 -9 678.10 -55.0 -50.2 -54.3 66 -99 SPO 1997 10 13 21 10 64 4.3 -9 678.10 -55.2 -50.5 -54.3 68 -99 SPO 1997 10 13 21 11 66 4.4 -9 678.10 -55.3 -50.7 -54.3 69 -99 SPO 1997 10 13 21 12 66 4.4 -9 678.10 -55.4 -50.8 -54.4 69 -99 SPO 1997 10 13 21 13 64 4.5 -9 678.10 -55.5 -50.7 -54.5 69 -99 SPO 1997 10 13 21 14 62 4.6 -9 678.10 -55.5 -50.6 -54.6 68 -99 SPO 1997 10 13 21 15 58 4.5 -9 678.10 -55.6 -50.7 -54.8 67 -99 SPO 1997 10 13 21 16 60 4.7 -9 678.20 -55.4 -50.5 -54.7 65 -99 SPO 1997 10 13 21 17 58 4.0 -9 678.20 -55.6 -50.5 -54.8 66 -99 SPO 1997 10 13 21 18 58 3.8 -9 678.20 -55.6 -51.0 -54.8 66 -99 SPO 1997 10 13 21 19 62 4.0 -9 678.20 -55.5 -51.1 -54.8 65 -99 SPO 1997 10 13 21 20 63 4.4 -9 678.20 -55.4 -50.9 -54.8 64 -99 SPO 1997 10 13 21 21 62 4.3 -9 678.20 -55.5 -50.7 -54.8 65 -99 SPO 1997 10 13 21 22 62 4.2 -9 678.20 -55.6 -50.9 -54.8 65 -99 SPO 1997 10 13 21 23 62 4.6 -9 678.20 -55.7 -50.9 -54.9 66 -99 SPO 1997 10 13 21 24 62 4.6 -9 678.20 -55.7 -51.0 -55.0 66 -99 SPO 1997 10 13 21 25 62 4.6 -9 678.20 -55.8 -51.0 -55.0 67 -99 SPO 1997 10 13 21 26 63 4.3 -9 678.30 -55.8 -51.0 -55.1 65 -99 SPO 1997 10 13 21 27 65 4.6 -9 678.30 -55.9 -51.0 -55.2 65 -99 SPO 1997 10 13 21 28 65 4.5 -9 678.20 -55.9 -51.0 -55.2 65 -99 SPO 1997 10 13 21 29 66 4.7 -9 678.30 -56.0 -51.0 -55.3 65 -99 SPO 1997 10 13 21 30 66 4.8 -9 678.30 -55.8 -51.0 -55.3 63 -99 SPO 1997 10 13 21 31 67 5.0 -9 678.20 -55.8 -51.0 -55.3 63 -99 SPO 1997 10 13 21 32 68 5.1 -9 678.30 -55.7 -50.8 -55.2 62 -99 SPO 1997 10 13 21 33 69 5.0 -9 678.30 -55.6 -50.8 -55.2 62 -99 SPO 1997 10 13 21 34 70 4.7 -9 678.20 -55.6 -51.0 -55.2 62 -99 SPO 1997 10 13 21 35 71 4.8 -9 678.20 -55.6 -51.0 -55.1 63 -99 SPO 1997 10 13 21 36 70 5.0 -9 678.30 -55.6 -51.0 -55.2 64 -99 SPO 1997 10 13 21 37 69 5.2 -9 678.20 -55.5 -50.8 -55.1 63 -99 SPO 1997 10 13 21 38 66 5.2 -9 678.20 -55.5 -50.5 -55.1 63 -99 SPO 1997 10 13 21 39 64 5.2 -9 678.20 -55.4 -50.8 -55.1 62 -99 SPO 1997 10 13 21 40 64 5.3 -9 678.20 -55.4 -50.8 -55.1 63 -99 SPO 1997 10 13 21 41 63 5.2 -9 678.20 -55.3 -50.7 -55.0 63 -99 SPO 1997 10 13 21 42 66 4.9 -9 678.20 -55.2 -50.8 -54.8 63 -99 SPO 1997 10 13 21 43 70 4.7 -9 678.20 -55.1 -51.0 -54.7 63 -99 SPO 1997 10 13 21 44 74 4.4 -9 678.20 -55.1 -51.1 -54.6 65 -99 SPO 1997 10 13 21 45 76 4.2 -9 678.20 -55.1 -51.4 -54.6 66 -99 SPO 1997 10 13 21 46 77 4.5 -9 678.30 -55.1 -51.7 -54.6 66 -99 SPO 1997 10 13 21 47 76 4.8 -9 678.20 -55.0 -51.7 -54.6 66 -99 SPO 1997 10 13 21 48 74 4.8 -9 678.20 -55.0 -51.6 -54.6 66 -99 SPO 1997 10 13 21 49 71 5.2 -9 678.20 -55.0 -51.4 -54.6 66 -99 SPO 1997 10 13 21 50 69 5.0 -9 678.20 -54.8 -51.4 -54.6 66 -99 SPO 1997 10 13 21 51 68 5.3 -9 678.20 -54.8 -51.3 -54.6 66 -99 SPO 1997 10 13 21 52 66 5.4 -9 678.20 -54.8 -51.2 -54.6 66 -99 SPO 1997 10 13 21 53 64 5.3 -9 678.20 -54.8 -51.1 -54.6 66 -99 SPO 1997 10 13 21 54 64 5.7 -9 678.20 -54.7 -50.9 -54.5 64 -99 SPO 1997 10 13 21 55 62 5.7 -9 678.20 -54.6 -50.7 -54.4 65 -99 SPO 1997 10 13 21 56 64 5.6 -9 678.20 -54.6 -50.6 -54.3 66 -99 SPO 1997 10 13 21 57 65 5.3 -9 678.20 -54.6 -50.8 -54.2 68 -99 SPO 1997 10 13 21 58 67 5.2 -9 678.20 -54.7 -51.0 -54.2 70 -99 SPO 1997 10 13 21 59 70 5.1 -9 678.20 -54.7 -51.1 -54.2 71 -99 SPO 1997 10 13 22 00 73 4.8 -9 678.20 -54.8 -51.3 -54.2 71 0 SPO 1997 10 13 22 01 75 4.7 -9 678.30 -54.9 -51.4 -54.2 71 -99 SPO 1997 10 13 22 02 75 4.9 -9 678.20 -55.0 -51.4 -54.2 71 -99 SPO 1997 10 13 22 03 74 4.9 -9 678.20 -55.1 -51.5 -54.2 70 -99 SPO 1997 10 13 22 04 73 5.1 -9 678.30 -55.1 -51.2 -54.3 68 -99 SPO 1997 10 13 22 05 71 5.4 -9 678.30 -55.1 -50.8 -54.3 68 -99 SPO 1997 10 13 22 06 68 5.1 -9 678.30 -55.0 -50.7 -54.3 66 -99 SPO 1997 10 13 22 07 67 4.7 -9 678.30 -55.1 -51.0 -54.3 67 -99 SPO 1997 10 13 22 08 66 4.9 -9 678.30 -55.1 -51.0 -54.4 67 -99 SPO 1997 10 13 22 09 68 5.0 -9 678.30 -55.1 -50.9 -54.3 67 -99 SPO 1997 10 13 22 10 69 5.1 -9 678.30 -55.1 -50.8 -54.2 67 -99 SPO 1997 10 13 22 11 71 5.0 -9 678.30 -55.1 -50.9 -54.2 67 -99 SPO 1997 10 13 22 12 73 5.0 -9 678.30 -55.2 -50.9 -54.1 68 -99 SPO 1997 10 13 22 13 74 4.7 -9 678.30 -55.4 -50.9 -54.1 69 -99 SPO 1997 10 13 22 14 74 4.7 -9 678.30 -55.5 -51.0 -54.1 70 -99 SPO 1997 10 13 22 15 72 4.8 -9 678.30 -55.6 -51.1 -54.1 69 -99 SPO 1997 10 13 22 16 69 5.0 -9 678.30 -55.6 -50.9 -54.2 68 -99 SPO 1997 10 13 22 17 68 5.0 -9 678.30 -55.6 -50.9 -54.2 67 -99 SPO 1997 10 13 22 18 67 5.2 -9 678.30 -55.6 -50.9 -54.3 66 -99 SPO 1997 10 13 22 19 67 5.3 -9 678.30 -55.6 -50.8 -54.3 67 -99 SPO 1997 10 13 22 20 67 5.3 -9 678.30 -55.5 -50.7 -54.3 66 -99 SPO 1997 10 13 22 21 66 5.3 -9 678.30 -55.4 -50.7 -54.4 65 -99 SPO 1997 10 13 22 22 67 5.3 -9 678.30 -55.4 -50.6 -54.3 66 -99 SPO 1997 10 13 22 23 67 5.1 -9 678.30 -55.4 -50.7 -54.2 67 -99 SPO 1997 10 13 22 24 68 5.3 -9 678.30 -55.4 -50.6 -54.2 67 -99 SPO 1997 10 13 22 25 68 5.3 -9 678.30 -55.4 -50.6 -54.1 67 -99 SPO 1997 10 13 22 26 67 5.2 -9 678.30 -55.4 -50.7 -54.1 68 -99 SPO 1997 10 13 22 27 68 5.1 -9 678.30 -55.4 -50.7 -54.1 68 -99 SPO 1997 10 13 22 28 68 5.1 -9 678.30 -55.4 -50.8 -54.1 67 -99 SPO 1997 10 13 22 29 68 4.9 -9 678.30 -55.4 -51.0 -54.1 66 -99 SPO 1997 10 13 22 30 69 4.8 -9 678.30 -55.5 -51.0 -54.0 66 -99 SPO 1997 10 13 22 31 71 4.6 -9 678.40 -55.4 -51.1 -53.9 65 -99 SPO 1997 10 13 22 32 72 4.2 -9 678.40 -55.5 -51.2 -53.8 66 -99 SPO 1997 10 13 22 33 73 4.1 -9 678.40 -55.6 -51.5 -53.8 67 -99 SPO 1997 10 13 22 34 73 4.1 -9 678.40 -55.6 -51.7 -54.0 67 -99 SPO 1997 10 13 22 35 73 4.5 -9 678.40 -55.7 -51.3 -54.3 68 -99 SPO 1997 10 13 22 36 69 4.7 -9 678.30 -55.6 -51.0 -54.6 66 -99 SPO 1997 10 13 22 37 67 4.6 -9 678.40 -55.6 -51.3 -54.7 66 -99 SPO 1997 10 13 22 38 67 5.1 -9 678.40 -55.6 -51.0 -54.8 66 -99 SPO 1997 10 13 22 39 67 5.2 -9 678.40 -55.6 -50.7 -54.8 66 -99 SPO 1997 10 13 22 40 68 5.0 -9 678.40 -55.4 -51.0 -54.7 65 -99 SPO 1997 10 13 22 41 72 4.8 -9 678.40 -55.4 -51.0 -54.4 65 -99 SPO 1997 10 13 22 42 74 4.8 -9 678.40 -55.4 -51.1 -54.2 65 -99 SPO 1997 10 13 22 43 76 5.0 -9 678.40 -55.4 -50.8 -54.0 64 -99 SPO 1997 10 13 22 44 72 4.8 -9 678.40 -55.6 -51.2 -54.0 65 -99 SPO 1997 10 13 22 45 70 5.3 -9 678.40 -55.7 -51.0 -54.1 65 -99 SPO 1997 10 13 22 46 67 5.4 -9 678.40 -55.6 -50.8 -54.2 65 -99 SPO 1997 10 13 22 47 65 5.4 -9 678.30 -55.5 -50.7 -54.3 65 -99 SPO 1997 10 13 22 48 64 5.4 -9 678.30 -55.4 -50.8 -54.3 65 -99 SPO 1997 10 13 22 49 65 5.5 -9 678.30 -55.2 -50.6 -54.2 64 -99 SPO 1997 10 13 22 50 66 5.3 -9 678.30 -55.0 -50.7 -54.0 64 -99 SPO 1997 10 13 22 51 67 5.2 -9 678.30 -55.0 -50.8 -54.0 66 -99 SPO 1997 10 13 22 52 66 5.3 -9 678.30 -55.2 -50.8 -54.1 67 -99 SPO 1997 10 13 22 53 65 5.3 -9 678.30 -55.2 -50.9 -54.1 67 -99 SPO 1997 10 13 22 54 65 5.1 -9 678.30 -55.3 -51.0 -54.1 68 -99 SPO 1997 10 13 22 55 66 5.3 -9 678.30 -55.3 -51.1 -54.2 67 -99 SPO 1997 10 13 22 56 66 5.4 -9 678.30 -55.4 -51.0 -54.5 67 -99 SPO 1997 10 13 22 57 66 5.2 -9 678.20 -55.5 -51.2 -54.8 67 -99 SPO 1997 10 13 22 58 69 5.2 -9 678.20 -55.6 -51.1 -54.9 67 -99 SPO 1997 10 13 22 59 70 4.8 -9 678.30 -55.6 -51.3 -54.9 66 -99 SPO 1997 10 13 23 00 72 4.8 -9 678.30 -55.7 -51.4 -54.9 66 0 SPO 1997 10 13 23 01 72 4.7 -9 678.30 -56.0 -51.4 -55.1 69 -99 SPO 1997 10 13 23 02 72 4.7 -9 678.30 -56.4 -51.6 -55.3 70 -99 SPO 1997 10 13 23 03 70 4.8 -9 678.20 -56.7 -51.7 -55.4 71 -99 SPO 1997 10 13 23 04 67 5.1 -9 678.20 -56.6 -51.7 -55.2 68 -99 SPO 1997 10 13 23 05 66 5.2 -9 678.20 -56.4 -51.6 -55.1 66 -99 SPO 1997 10 13 23 06 65 5.3 -9 678.20 -56.3 -51.5 -55.2 65 -99 SPO 1997 10 13 23 07 65 5.2 -9 678.20 -56.4 -51.3 -55.4 66 -99 SPO 1997 10 13 23 08 65 5.2 -9 678.20 -56.5 -51.4 -55.8 66 -99 SPO 1997 10 13 23 09 67 5.1 -9 678.20 -56.6 -51.2 -56.0 66 -99 SPO 1997 10 13 23 10 67 5.2 -9 678.20 -56.8 -51.2 -56.1 67 -99 SPO 1997 10 13 23 11 68 5.3 -9 678.20 -56.8 -51.2 -56.0 66 -99 SPO 1997 10 13 23 12 68 5.4 -9 678.20 -56.7 -51.2 -55.8 66 -99 SPO 1997 10 13 23 13 66 5.5 -9 678.20 -56.6 -51.0 -55.6 65 -99 SPO 1997 10 13 23 14 62 5.5 -9 678.20 -56.5 -51.1 -55.5 65 -99 SPO 1997 10 13 23 15 61 5.7 -9 678.20 -56.5 -50.8 -55.5 65 -99 SPO 1997 10 13 23 16 60 5.9 -9 678.20 -56.4 -50.7 -55.5 64 -99 SPO 1997 10 13 23 17 61 5.9 -9 678.20 -56.4 -50.4 -55.4 65 -99 SPO 1997 10 13 23 18 62 5.8 -9 678.20 -56.4 -50.4 -55.4 66 -99 SPO 1997 10 13 23 19 63 5.8 -9 678.20 -56.3 -50.6 -55.4 64 -99 SPO 1997 10 13 23 20 65 5.5 -9 678.20 -56.3 -50.9 -55.4 64 -99 SPO 1997 10 13 23 21 64 5.3 -9 678.20 -56.2 -51.2 -55.2 64 -99 SPO 1997 10 13 23 22 64 5.5 -9 678.20 -56.1 -51.2 -55.2 64 -99 SPO 1997 10 13 23 23 64 5.8 -9 678.20 -56.1 -50.8 -55.1 64 -99 SPO 1997 10 13 23 24 60 5.7 -9 678.20 -56.0 -50.7 -55.1 64 -99 SPO 1997 10 13 23 25 63 5.7 -9 678.20 -55.7 -50.8 -54.9 62 -99 SPO 1997 10 13 23 26 61 5.7 -9 678.20 -55.7 -50.6 -54.8 64 -99 SPO 1997 10 13 23 27 60 6.0 -9 678.20 -55.6 -50.5 -54.7 65 -99 SPO 1997 10 13 23 28 59 5.5 -9 678.10 -55.5 -50.6 -54.6 65 -99 SPO 1997 10 13 23 29 58 5.5 -9 678.20 -55.4 -50.7 -54.6 65 -99 SPO 1997 10 13 23 30 60 5.7 -9 678.20 -55.4 -50.8 -54.8 65 -99 SPO 1997 10 13 23 31 60 5.9 -9 678.10 -55.3 -50.9 -54.9 66 -99 SPO 1997 10 13 23 32 59 5.7 -9 678.10 -55.3 -50.8 -55.0 68 -99 SPO 1997 10 13 23 33 58 5.8 -9 678.10 -55.3 -50.7 -54.8 68 -99 SPO 1997 10 13 23 34 59 5.8 -9 678.10 -55.2 -50.6 -54.5 67 -99 SPO 1997 10 13 23 35 60 6.1 -9 678.10 -55.1 -50.5 -54.4 66 -99 SPO 1997 10 13 23 36 59 6.0 -9 678.10 -55.0 -50.6 -54.3 66 -99 SPO 1997 10 13 23 37 59 5.8 -9 678.10 -54.9 -50.6 -54.2 66 -99 SPO 1997 10 13 23 38 59 5.8 -9 678.10 -54.9 -50.6 -54.2 67 -99 SPO 1997 10 13 23 39 59 5.6 -9 678.20 -54.9 -50.7 -54.1 70 -99 SPO 1997 10 13 23 40 59 5.7 -9 678.20 -54.9 -50.6 -54.1 71 -99 SPO 1997 10 13 23 41 59 5.3 -9 678.20 -54.8 -50.7 -54.0 71 -99 SPO 1997 10 13 23 42 61 5.3 -9 678.20 -54.8 -50.4 -54.0 71 -99 SPO 1997 10 13 23 43 60 5.4 -9 678.20 -54.9 -50.6 -54.2 72 -99 SPO 1997 10 13 23 44 61 5.2 -9 678.20 -54.9 -50.8 -54.3 72 -99 SPO 1997 10 13 23 45 61 5.2 -9 678.20 -54.9 -50.8 -54.1 71 -99 SPO 1997 10 13 23 46 60 5.5 -9 678.20 -54.9 -50.6 -54.0 71 -99 SPO 1997 10 13 23 47 60 5.4 -9 678.20 -54.9 -50.5 -54.0 71 -99 SPO 1997 10 13 23 48 60 5.3 -9 678.20 -54.9 -50.4 -54.0 71 -99 SPO 1997 10 13 23 49 59 5.2 -9 678.20 -55.0 -50.8 -54.0 71 -99 SPO 1997 10 13 23 50 60 5.1 -9 678.20 -55.0 -51.0 -54.0 71 -99 SPO 1997 10 13 23 51 60 5.1 -9 678.20 -55.0 -51.0 -54.0 71 -99 SPO 1997 10 13 23 52 61 5.2 -9 678.20 -55.0 -51.0 -54.0 71 -99 SPO 1997 10 13 23 53 60 5.3 -9 678.20 -55.0 -51.0 -54.1 71 -99 SPO 1997 10 13 23 54 59 5.5 -9 678.20 -55.1 -50.6 -54.1 71 -99 SPO 1997 10 13 23 55 58 5.7 -9 678.20 -55.0 -50.2 -54.2 69 -99 SPO 1997 10 13 23 56 55 5.6 -9 678.20 -55.0 -50.5 -54.1 69 -99 SPO 1997 10 13 23 57 55 5.6 -9 678.20 -55.0 -50.5 -54.0 69 -99 SPO 1997 10 13 23 58 56 5.4 -9 678.20 -55.0 -50.6 -54.1 -99 -99 SPO 1997 10 13 23 59 58 5.4 -9 678.20 -55.0 -50.4 -54.1 -99 -99 SPO 1997 10 14 00 00 60 5.1 -9 678.30 -55.1 -50.9 -54.0 -99 0 SPO 1997 10 14 00 01 60 5.1 -9 678.30 -55.1 -51.0 -54.1 -99 -99 SPO 1997 10 14 00 02 61 5.2 -9 678.20 -55.1 -50.9 -54.1 -99 -99 SPO 1997 10 14 00 03 61 5.4 -9 678.20 -55.1 -50.8 -54.1 69 -99 SPO 1997 10 14 00 04 61 5.5 -9 678.20 -55.2 -50.7 -54.2 69 -99 SPO 1997 10 14 00 05 60 5.7 -9 678.20 -55.3 -50.7 -54.2 70 -99 SPO 1997 10 14 00 06 60 5.8 -9 678.20 -55.3 -50.4 -54.3 70 -99 SPO 1997 10 14 00 07 59 5.7 -9 678.10 -55.3 -50.6 -54.3 70 -99 SPO 1997 10 14 00 08 59 5.9 -9 678.20 -55.4 -50.5 -54.4 70 -99 SPO 1997 10 14 00 09 58 5.8 -9 678.10 -55.5 -50.6 -54.4 71 -99 SPO 1997 10 14 00 10 57 5.8 -9 678.10 -55.5 -50.4 -54.5 70 -99 SPO 1997 10 14 00 11 56 6.0 -9 678.10 -55.5 -50.2 -54.6 69 -99 SPO 1997 10 14 00 12 55 6.0 -9 678.10 -55.5 -50.4 -54.7 68 -99 SPO 1997 10 14 00 13 54 6.2 -9 678.10 -55.5 -50.3 -54.8 68 -99 SPO 1997 10 14 00 14 54 6.3 -9 678.00 -55.4 -50.3 -54.9 67 -99 SPO 1997 10 14 00 15 53 6.5 -9 678.00 -55.4 -50.2 -54.8 67 -99 SPO 1997 10 14 00 16 54 6.8 -9 678.10 -55.4 -50.0 -54.6 68 -99 SPO 1997 10 14 00 17 54 6.6 -9 678.10 -55.3 -49.9 -54.4 68 -99 SPO 1997 10 14 00 18 55 6.5 -9 678.10 -55.3 -49.9 -54.3 69 -99 SPO 1997 10 14 00 19 56 6.4 -9 678.10 -55.3 -49.9 -54.3 69 -99 SPO 1997 10 14 00 20 59 6.2 -9 678.10 -55.3 -49.8 -54.4 69 -99 SPO 1997 10 14 00 21 60 6.0 -9 678.10 -55.4 -49.9 -54.4 70 -99 SPO 1997 10 14 00 22 61 6.0 -9 678.10 -55.4 -50.0 -54.4 69 -99 SPO 1997 10 14 00 23 62 5.8 -9 678.10 -55.5 -50.2 -54.5 69 -99 SPO 1997 10 14 00 24 64 5.6 -9 678.10 -55.5 -50.4 -54.6 68 -99 SPO 1997 10 14 00 25 66 5.8 -9 678.10 -55.6 -50.6 -54.7 68 -99 SPO 1997 10 14 00 26 66 5.8 -9 678.10 -55.7 -50.7 -54.8 68 -99 SPO 1997 10 14 00 27 67 5.8 -9 678.10 -55.8 -50.8 -54.8 69 -99 SPO 1997 10 14 00 28 68 5.5 -9 678.20 -55.9 -51.0 -54.9 69 -99 SPO 1997 10 14 00 29 70 5.4 -9 678.20 -55.9 -51.2 -54.9 68 -99 SPO 1997 10 14 00 30 71 5.6 -9 678.20 -56.0 -51.3 -54.9 69 -99 SPO 1997 10 14 00 31 70 5.7 -9 678.20 -56.1 -51.2 -55.0 69 -99 SPO 1997 10 14 00 32 69 5.8 -9 678.20 -56.0 -51.2 -55.0 68 -99 SPO 1997 10 14 00 33 68 5.7 -9 678.20 -56.1 -51.1 -55.1 68 -99 SPO 1997 10 14 00 34 68 5.7 -9 678.20 -56.1 -51.2 -55.4 68 -99 SPO 1997 10 14 00 35 69 5.5 -9 678.20 -56.1 -51.2 -55.5 67 -99 SPO 1997 10 14 00 36 70 5.3 -9 678.20 -56.1 -51.3 -55.5 66 -99 SPO 1997 10 14 00 37 70 5.4 -9 678.20 -56.1 -51.4 -55.4 65 -99 SPO 1997 10 14 00 38 70 5.4 -9 678.20 -56.1 -51.4 -55.2 65 -99 SPO 1997 10 14 00 39 70 5.4 -9 678.20 -56.1 -51.4 -55.5 65 -99 SPO 1997 10 14 00 40 70 5.4 -9 678.20 -56.1 -51.4 -55.7 64 -99 SPO 1997 10 14 00 41 69 5.2 -9 678.20 -56.2 -51.4 -55.8 65 -99 SPO 1997 10 14 00 42 70 5.2 -9 678.20 -56.2 -51.5 -55.9 65 -99 SPO 1997 10 14 00 43 71 5.2 -9 678.20 -56.2 -51.5 -55.8 65 -99 SPO 1997 10 14 00 44 71 5.2 -9 678.20 -56.2 -51.5 -55.5 64 -99 SPO 1997 10 14 00 45 70 5.3 -9 678.20 -56.3 -51.4 -55.4 65 -99 SPO 1997 10 14 00 46 69 5.4 -9 678.20 -56.2 -51.2 -55.3 64 -99 SPO 1997 10 14 00 47 67 5.5 -9 678.20 -56.3 -51.0 -55.3 64 -99 SPO 1997 10 14 00 48 67 5.6 -9 678.20 -56.2 -50.8 -55.3 63 -99 SPO 1997 10 14 00 49 68 5.6 -9 678.20 -56.2 -50.8 -55.3 63 -99 SPO 1997 10 14 00 50 69 5.6 -9 678.20 -56.2 -50.8 -55.2 63 -99 SPO 1997 10 14 00 51 70 5.5 -9 678.20 -56.2 -51.0 -55.2 64 -99 SPO 1997 10 14 00 52 70 5.4 -9 678.20 -56.2 -51.0 -55.2 64 -99 SPO 1997 10 14 00 53 70 5.3 -9 678.20 -56.2 -51.1 -55.2 64 -99 SPO 1997 10 14 00 54 69 5.5 -9 678.20 -56.2 -51.1 -55.2 64 -99 SPO 1997 10 14 00 55 69 5.5 -9 678.20 -56.2 -51.0 -55.2 64 -99 SPO 1997 10 14 00 56 70 5.3 -9 678.20 -56.2 -51.0 -55.2 65 -99 SPO 1997 10 14 00 57 72 5.2 -9 678.20 -56.2 -51.2 -55.1 65 -99 SPO 1997 10 14 00 58 74 5.0 -9 678.20 -56.2 -51.4 -55.0 65 -99 SPO 1997 10 14 00 59 75 4.8 -9 678.20 -56.2 -51.6 -54.9 65 -99 SPO 1997 10 14 01 00 75 4.7 -9 678.20 -56.3 -51.8 -54.8 64 0 SPO 1997 10 14 01 01 75 4.6 -9 678.20 -56.3 -51.9 -54.9 64 -99 SPO 1997 10 14 01 02 74 4.8 -9 678.20 -56.4 -51.9 -54.9 64 -99 SPO 1997 10 14 01 03 73 4.7 -9 678.20 -56.3 -51.9 -54.9 63 -99 SPO 1997 10 14 01 04 71 4.8 -9 678.20 -56.3 -51.9 -55.0 64 -99 SPO 1997 10 14 01 05 70 4.8 -9 678.10 -56.2 -51.9 -55.0 64 -99 SPO 1997 10 14 01 06 71 4.7 -9 678.10 -56.2 -52.0 -55.1 64 -99 SPO 1997 10 14 01 07 73 4.7 -9 678.10 -56.2 -52.0 -55.0 64 -99 SPO 1997 10 14 01 08 73 4.8 -9 678.10 -56.3 -52.1 -54.9 65 -99 SPO 1997 10 14 01 09 74 4.8 -9 678.20 -56.2 -52.2 -54.9 64 -99 SPO 1997 10 14 01 10 75 4.8 -9 678.20 -56.2 -52.2 -54.8 64 -99 SPO 1997 10 14 01 11 76 4.9 -9 678.20 -56.2 -52.2 -54.8 65 -99 SPO 1997 10 14 01 12 78 4.8 -9 678.20 -56.3 -52.2 -54.8 65 -99 SPO 1997 10 14 01 13 79 4.8 -9 678.20 -56.4 -52.3 -54.8 65 -99 SPO 1997 10 14 01 14 79 4.8 -9 678.20 -56.4 -52.4 -54.8 64 -99 SPO 1997 10 14 01 15 78 4.9 -9 678.20 -56.4 -52.5 -54.9 64 -99 SPO 1997 10 14 01 16 76 4.8 -9 678.20 -56.4 -52.4 -54.8 63 -99 SPO 1997 10 14 01 17 75 4.8 -9 678.20 -56.4 -52.3 -54.8 64 -99 SPO 1997 10 14 01 18 75 5.0 -9 678.20 -56.4 -52.2 -54.9 64 -99 SPO 1997 10 14 01 19 76 5.0 -9 678.20 -56.3 -52.1 -54.9 63 -99 SPO 1997 10 14 01 20 75 4.5 -9 678.30 -56.3 -52.3 -54.8 64 -99 SPO 1997 10 14 01 21 77 4.8 -9 678.30 -56.2 -52.0 -54.7 64 -99 SPO 1997 10 14 01 22 78 5.0 -9 678.20 -56.2 -52.1 -54.7 64 -99 SPO 1997 10 14 01 23 76 5.0 -9 678.20 -56.2 -52.1 -54.8 64 -99 SPO 1997 10 14 01 24 76 5.5 -9 678.20 -56.3 -51.9 -54.8 65 -99 SPO 1997 10 14 01 25 73 5.8 -9 678.20 -56.3 -51.6 -54.9 65 -99 SPO 1997 10 14 01 26 72 5.7 -9 678.20 -56.2 -51.6 -54.9 64 -99 SPO 1997 10 14 01 27 72 5.7 -9 678.20 -56.0 -51.5 -54.9 63 -99 SPO 1997 10 14 01 28 73 5.7 -9 678.20 -55.9 -51.8 -54.8 62 -99 SPO 1997 10 14 01 29 73 5.7 -9 678.20 -55.8 -51.8 -54.8 62 -99 SPO 1997 10 14 01 30 71 5.5 -9 678.20 -55.8 -51.6 -54.8 63 -99 SPO 1997 10 14 01 31 70 5.6 -9 678.20 -55.8 -51.5 -54.7 64 -99 SPO 1997 10 14 01 32 69 5.5 -9 678.20 -55.6 -51.3 -54.6 63 -99 SPO 1997 10 14 01 33 69 5.4 -9 678.20 -55.5 -51.4 -54.6 63 -99 SPO 1997 10 14 01 34 69 5.5 -9 678.20 -55.4 -51.3 -54.5 63 -99 SPO 1997 10 14 01 35 69 5.4 -9 678.20 -55.4 -51.3 -54.4 63 -99 SPO 1997 10 14 01 36 69 5.3 -9 678.20 -55.4 -51.4 -54.4 64 -99 SPO 1997 10 14 01 37 69 5.0 -9 678.20 -55.4 -51.4 -54.4 65 -99 SPO 1997 10 14 01 38 68 5.0 -9 678.20 -55.4 -51.5 -54.4 65 -99 SPO 1997 10 14 01 39 67 5.1 -9 678.20 -55.4 -51.6 -54.4 65 -99 SPO 1997 10 14 01 40 65 5.2 -9 678.20 -55.5 -51.3 -54.4 66 -99 SPO 1997 10 14 01 41 65 5.2 -9 678.20 -55.5 -51.2 -54.4 66 -99 SPO 1997 10 14 01 42 65 5.2 -9 678.20 -55.5 -51.4 -54.5 66 -99 SPO 1997 10 14 01 43 65 5.2 -9 678.20 -55.5 -51.3 -54.4 66 -99 SPO 1997 10 14 01 44 66 5.3 -9 678.20 -55.4 -51.2 -54.4 65 -99 SPO 1997 10 14 01 45 68 5.1 -9 678.20 -55.4 -51.2 -54.4 65 -99 SPO 1997 10 14 01 46 69 5.1 -9 678.20 -55.4 -51.3 -54.4 65 -99 SPO 1997 10 14 01 47 69 5.1 -9 678.20 -55.5 -51.4 -54.3 66 -99 SPO 1997 10 14 01 48 68 5.0 -9 678.20 -55.5 -51.4 -54.3 66 -99 SPO 1997 10 14 01 49 66 5.1 -9 678.20 -55.4 -51.3 -54.3 65 -99 SPO 1997 10 14 01 50 65 5.2 -9 678.20 -55.4 -51.2 -54.3 66 -99 SPO 1997 10 14 01 51 62 5.4 -9 678.20 -55.3 -51.0 -54.3 65 -99 SPO 1997 10 14 01 52 60 5.5 -9 678.20 -55.3 -51.0 -54.3 65 -99 SPO 1997 10 14 01 53 61 5.5 -9 678.20 -55.3 -51.0 -54.2 65 -99 SPO 1997 10 14 01 54 62 5.5 -9 678.20 -55.2 -51.0 -54.2 65 -99 SPO 1997 10 14 01 55 63 5.5 -9 678.20 -55.2 -51.0 -54.2 65 -99 SPO 1997 10 14 01 56 63 5.5 -9 678.20 -55.2 -50.9 -54.3 66 -99 SPO 1997 10 14 01 57 62 5.6 -9 678.10 -55.2 -50.7 -54.3 66 -99 SPO 1997 10 14 01 58 60 5.5 -9 678.10 -55.1 -50.5 -54.2 66 -99 SPO 1997 10 14 01 59 60 5.5 -9 678.10 -55.0 -50.0 -54.0 65 -99 SPO 1997 10 14 02 00 60 5.5 -9 678.20 -55.0 -49.6 -54.0 66 0 SPO 1997 10 14 02 01 60 5.5 -9 678.10 -55.0 -49.5 -54.0 66 -99 SPO 1997 10 14 02 02 61 5.4 -9 678.10 -55.0 -49.5 -54.0 66 -99 SPO 1997 10 14 02 03 62 5.4 -9 678.10 -55.1 -49.4 -54.1 66 -99 SPO 1997 10 14 02 04 64 5.2 -9 678.10 -55.0 -49.6 -54.1 66 -99 SPO 1997 10 14 02 05 65 5.1 -9 678.10 -55.1 -49.8 -54.1 66 -99 SPO 1997 10 14 02 06 67 5.0 -9 678.10 -55.1 -50.1 -54.1 66 -99 SPO 1997 10 14 02 07 68 4.9 -9 678.10 -55.2 -50.4 -54.1 66 -99 SPO 1997 10 14 02 08 69 4.8 -9 678.10 -55.3 -50.7 -54.1 66 -99 SPO 1997 10 14 02 09 69 4.7 -9 678.20 -55.5 -50.9 -54.1 68 -99 SPO 1997 10 14 02 10 71 4.7 -9 678.20 -55.5 -50.9 -54.1 67 -99 SPO 1997 10 14 02 11 72 4.7 -9 678.20 -55.8 -51.0 -54.1 70 -99 SPO 1997 10 14 02 12 74 4.5 -9 678.10 -56.0 -51.1 -54.2 70 -99 SPO 1997 10 14 02 13 74 4.7 -9 678.10 -56.2 -51.3 -54.3 70 -99 SPO 1997 10 14 02 14 73 5.0 -9 678.10 -56.4 -51.3 -54.4 70 -99 SPO 1997 10 14 02 15 72 5.1 -9 678.10 -56.4 -51.3 -54.5 69 -99 SPO 1997 10 14 02 16 72 5.2 -9 678.10 -56.4 -51.3 -54.6 67 -99 SPO 1997 10 14 02 17 73 5.2 -9 678.10 -56.4 -51.3 -54.6 65 -99 SPO 1997 10 14 02 18 74 5.1 -9 678.10 -56.5 -51.4 -54.6 65 -99 SPO 1997 10 14 02 19 73 5.1 -9 678.10 -56.6 -51.5 -54.7 65 -99 SPO 1997 10 14 02 20 71 5.2 -9 678.10 -56.7 -51.5 -54.8 66 -99 SPO 1997 10 14 02 21 69 5.3 -9 678.10 -56.7 -51.4 -55.0 66 -99 SPO 1997 10 14 02 22 69 5.1 -9 678.10 -56.7 -51.4 -55.0 66 -99 SPO 1997 10 14 02 23 70 5.0 -9 678.20 -56.7 -51.4 -55.0 65 -99 SPO 1997 10 14 02 24 71 5.1 -9 678.20 -56.7 -51.5 -55.0 65 -99 SPO 1997 10 14 02 25 72 5.2 -9 678.20 -56.7 -51.5 -54.9 65 -99 SPO 1997 10 14 02 26 73 5.3 -9 678.20 -56.7 -51.6 -54.9 65 -99 SPO 1997 10 14 02 27 72 5.5 -9 678.20 -56.7 -51.6 -54.9 65 -99 SPO 1997 10 14 02 28 72 5.6 -9 678.20 -56.6 -51.5 -55.0 64 -99 SPO 1997 10 14 02 29 71 5.7 -9 678.20 -56.5 -51.4 -55.1 63 -99 SPO 1997 10 14 02 30 69 5.8 -9 678.20 -56.4 -51.4 -55.2 62 -99 SPO 1997 10 14 02 31 67 6.0 -9 678.20 -56.4 -51.2 -55.2 62 -99 SPO 1997 10 14 02 32 66 6.0 -9 678.20 -56.4 -51.2 -55.1 62 -99 SPO 1997 10 14 02 33 65 5.9 -9 678.20 -56.4 -51.2 -55.1 64 -99 SPO 1997 10 14 02 34 64 5.8 -9 678.20 -56.4 -51.2 -55.1 64 -99 SPO 1997 10 14 02 35 64 5.6 -9 678.20 -56.3 -51.2 -55.1 64 -99 SPO 1997 10 14 02 36 64 5.6 -9 678.20 -56.3 -51.2 -55.1 64 -99 SPO 1997 10 14 02 37 65 5.6 -9 678.20 -56.3 -51.2 -55.0 65 -99 SPO 1997 10 14 02 38 67 5.7 -9 678.20 -56.3 -51.2 -55.1 65 -99 SPO 1997 10 14 02 39 67 5.8 -9 678.20 -56.2 -51.1 -55.1 64 -99 SPO 1997 10 14 02 40 67 6.0 -9 678.20 -56.2 -51.1 -55.0 64 -99 SPO 1997 10 14 02 41 66 6.1 -9 678.20 -56.2 -51.1 -55.0 64 -99 SPO 1997 10 14 02 42 66 6.2 -9 678.20 -56.1 -51.0 -54.9 64 -99 SPO 1997 10 14 02 43 65 6.0 -9 678.20 -56.0 -51.0 -54.9 64 -99 SPO 1997 10 14 02 44 66 5.9 -9 678.20 -56.1 -51.0 -54.8 64 -99 SPO 1997 10 14 02 45 65 5.7 -9 678.20 -56.1 -51.0 -54.8 65 -99 SPO 1997 10 14 02 46 66 5.5 -9 678.20 -56.0 -51.1 -54.8 65 -99 SPO 1997 10 14 02 47 66 5.4 -9 678.20 -56.0 -51.2 -54.7 66 -99 SPO 1997 10 14 02 48 66 5.4 -9 678.20 -55.9 -51.2 -54.7 65 -99 SPO 1997 10 14 02 49 65 5.7 -9 678.10 -55.9 -51.1 -54.7 65 -99 SPO 1997 10 14 02 50 64 5.8 -9 678.10 -55.8 -51.0 -54.7 65 -99 SPO 1997 10 14 02 51 63 5.9 -9 678.10 -55.7 -50.9 -54.6 65 -99 SPO 1997 10 14 02 52 62 5.9 -9 678.10 -55.7 -50.9 -54.5 65 -99 SPO 1997 10 14 02 53 62 5.9 -9 678.10 -55.6 -50.8 -54.4 64 -99 SPO 1997 10 14 02 54 62 5.7 -9 678.10 -55.5 -50.7 -54.4 64 -99 SPO 1997 10 14 02 55 63 5.5 -9 678.10 -55.4 -50.8 -54.3 62 -99 SPO 1997 10 14 02 56 62 5.4 -9 678.10 -55.4 -50.8 -54.3 62 -99 SPO 1997 10 14 02 57 63 5.4 -9 678.10 -55.4 -50.9 -54.2 64 -99 SPO 1997 10 14 02 58 63 5.3 -9 678.10 -55.4 -50.9 -54.2 65 -99 SPO 1997 10 14 02 59 62 5.4 -9 678.10 -55.4 -50.9 -54.2 65 -99 SPO 1997 10 14 03 00 61 5.4 -9 678.10 -55.4 -50.9 -54.2 65 0 SPO 1997 10 14 03 01 61 5.3 -9 678.10 -55.4 -50.8 -54.2 66 -99 SPO 1997 10 14 03 02 61 5.4 -9 678.10 -55.3 -50.7 -54.1 65 -99 SPO 1997 10 14 03 03 63 5.2 -9 678.10 -55.3 -50.7 -54.1 65 -99 SPO 1997 10 14 03 04 65 5.2 -9 678.10 -55.3 -50.7 -54.1 66 -99 SPO 1997 10 14 03 05 66 5.0 -9 678.10 -55.3 -50.8 -54.1 65 -99 SPO 1997 10 14 03 06 66 5.1 -9 678.10 -55.3 -50.8 -54.2 65 -99 SPO 1997 10 14 03 07 67 5.2 -9 678.10 -55.4 -50.8 -54.2 65 -99 SPO 1997 10 14 03 08 67 5.3 -9 678.10 -55.4 -50.8 -54.2 65 -99 SPO 1997 10 14 03 09 67 5.4 -9 678.10 -55.4 -50.7 -54.2 65 -99 SPO 1997 10 14 03 10 67 5.3 -9 678.10 -55.4 -50.7 -54.2 65 -99 SPO 1997 10 14 03 11 67 5.2 -9 678.10 -55.4 -50.8 -54.2 65 -99 SPO 1997 10 14 03 12 67 5.2 -9 678.10 -55.4 -50.9 -54.2 65 -99 SPO 1997 10 14 03 13 68 5.0 -9 678.10 -55.4 -51.0 -54.2 65 -99 SPO 1997 10 14 03 14 70 5.0 -9 678.10 -55.5 -51.1 -54.2 66 -99 SPO 1997 10 14 03 15 72 4.8 -9 678.20 -55.6 -51.3 -54.2 67 -99 SPO 1997 10 14 03 16 71 4.7 -9 678.20 -55.8 -51.4 -54.1 68 -99 SPO 1997 10 14 03 17 70 4.8 -9 678.20 -55.8 -51.4 -54.2 67 -99 SPO 1997 10 14 03 18 69 5.0 -9 678.20 -55.9 -51.4 -54.3 66 -99 SPO 1997 10 14 03 19 68 5.2 -9 678.20 -55.8 -51.4 -54.4 65 -99 SPO 1997 10 14 03 20 68 5.2 -9 678.20 -55.7 -51.2 -54.4 64 -99 SPO 1997 10 14 03 21 67 5.2 -9 678.20 -55.7 -51.2 -54.5 64 -99 SPO 1997 10 14 03 22 68 5.1 -9 678.20 -55.8 -51.2 -54.5 65 -99 SPO 1997 10 14 03 23 69 5.0 -9 678.20 -55.8 -51.3 -54.5 65 -99 SPO 1997 10 14 03 24 70 5.1 -9 678.20 -55.8 -51.4 -54.5 65 -99 SPO 1997 10 14 03 25 68 5.2 -9 678.20 -55.9 -51.3 -54.5 66 -99 SPO 1997 10 14 03 26 67 5.2 -9 678.20 -55.9 -51.2 -54.6 66 -99 SPO 1997 10 14 03 27 65 5.4 -9 678.20 -55.9 -51.1 -54.6 65 -99 SPO 1997 10 14 03 28 63 5.3 -9 678.20 -55.9 -51.2 -54.6 65 -99 SPO 1997 10 14 03 29 62 5.4 -9 678.20 -55.9 -51.1 -54.6 65 -99 SPO 1997 10 14 03 30 63 5.4 -9 678.20 -55.8 -51.0 -54.5 65 -99 SPO 1997 10 14 03 31 63 5.4 -9 678.20 -55.9 -50.9 -54.5 65 -99 SPO 1997 10 14 03 32 65 5.5 -9 678.20 -55.9 -50.8 -54.6 65 -99 SPO 1997 10 14 03 33 66 5.4 -9 678.20 -55.8 -50.8 -54.5 65 -99 SPO 1997 10 14 03 34 66 5.3 -9 678.20 -55.8 -50.9 -54.5 65 -99 SPO 1997 10 14 03 35 67 5.4 -9 678.20 -55.8 -51.0 -54.6 65 -99 SPO 1997 10 14 03 36 67 5.6 -9 678.20 -55.8 -51.0 -54.6 65 -99 SPO 1997 10 14 03 37 66 5.9 -9 678.20 -55.9 -50.9 -54.7 66 -99 SPO 1997 10 14 03 38 64 6.0 -9 678.20 -55.9 -50.8 -54.7 66 -99 SPO 1997 10 14 03 39 63 6.2 -9 678.10 -55.9 -50.6 -54.6 66 -99 SPO 1997 10 14 03 40 62 6.3 -9 678.10 -55.8 -50.5 -54.6 65 -99 SPO 1997 10 14 03 41 62 6.5 -9 678.10 -55.8 -50.4 -54.6 65 -99 SPO 1997 10 14 03 42 61 6.7 -9 678.10 -55.7 -50.2 -54.6 64 -99 SPO 1997 10 14 03 43 61 6.7 -9 678.10 -55.6 -50.1 -54.5 63 -99 SPO 1997 10 14 03 44 61 6.6 -9 678.10 -55.6 -50.1 -54.5 63 -99 SPO 1997 10 14 03 45 59 6.5 -9 678.20 -55.6 -50.2 -54.4 64 -99 SPO 1997 10 14 03 46 59 6.4 -9 678.20 -55.5 -50.4 -54.4 64 -99 SPO 1997 10 14 03 47 59 6.3 -9 678.20 -55.5 -50.4 -54.4 65 -99 SPO 1997 10 14 03 48 59 6.2 -9 678.20 -55.5 -50.4 -54.3 65 -99 SPO 1997 10 14 03 49 59 6.1 -9 678.20 -55.5 -50.4 -54.2 65 -99 SPO 1997 10 14 03 50 60 6.0 -9 678.20 -55.4 -50.2 -54.2 65 -99 SPO 1997 10 14 03 51 61 6.0 -9 678.20 -55.5 -50.2 -54.2 66 -99 SPO 1997 10 14 03 52 61 6.0 -9 678.20 -55.4 -50.2 -54.2 65 -99 SPO 1997 10 14 03 53 61 6.1 -9 678.20 -55.5 -50.2 -54.3 66 -99 SPO 1997 10 14 03 54 60 6.1 -9 678.20 -55.5 -50.3 -54.3 66 -99 SPO 1997 10 14 03 55 60 6.1 -9 678.20 -55.5 -50.3 -54.3 65 -99 SPO 1997 10 14 03 56 61 6.3 -9 678.20 -55.4 -50.2 -54.3 65 -99 SPO 1997 10 14 03 57 61 6.4 -9 678.10 -55.4 -50.1 -54.2 65 -99 SPO 1997 10 14 03 58 60 6.5 -9 678.10 -55.2 -49.9 -54.2 63 -99 SPO 1997 10 14 03 59 58 6.6 -9 678.10 -55.2 -49.8 -54.2 64 -99 SPO 1997 10 14 04 00 58 6.5 -9 678.10 -55.1 -49.7 -54.1 65 0 SPO 1997 10 14 04 01 57 6.6 -9 678.10 -55.0 -49.7 -54.0 64 -99 SPO 1997 10 14 04 02 57 6.6 -9 678.10 -55.0 -49.6 -54.0 66 -99 SPO 1997 10 14 04 03 57 6.5 -9 678.10 -55.0 -49.6 -54.0 66 -99 SPO 1997 10 14 04 04 57 6.3 -9 678.10 -55.0 -49.6 -54.0 66 -99 SPO 1997 10 14 04 05 57 6.2 -9 678.10 -55.1 -49.6 -54.0 66 -99 SPO 1997 10 14 04 06 58 6.0 -9 678.10 -55.1 -49.6 -54.0 66 -99 SPO 1997 10 14 04 07 58 6.0 -9 678.10 -55.2 -49.7 -54.0 67 -99 SPO 1997 10 14 04 08 57 6.0 -9 678.10 -55.2 -49.7 -54.1 66 -99 SPO 1997 10 14 04 09 56 6.1 -9 678.10 -55.3 -49.6 -54.1 67 -99 SPO 1997 10 14 04 10 55 6.0 -9 678.10 -55.3 -49.8 -54.2 66 -99 SPO 1997 10 14 04 11 55 6.3 -9 678.10 -55.4 -49.9 -54.2 67 -99 SPO 1997 10 14 04 12 55 6.3 -9 678.10 -55.4 -49.9 -54.2 67 -99 SPO 1997 10 14 04 13 54 6.4 -9 678.00 -55.3 -49.8 -54.2 66 -99 SPO 1997 10 14 04 14 54 6.4 -9 678.00 -55.2 -49.4 -54.1 66 -99 SPO 1997 10 14 04 15 54 6.5 -9 678.00 -55.2 -49.4 -54.1 66 -99 SPO 1997 10 14 04 16 53 6.6 -9 678.00 -55.1 -49.2 -54.1 66 -99 SPO 1997 10 14 04 17 52 6.7 -9 678.00 -55.0 -49.2 -54.0 66 -99 SPO 1997 10 14 04 18 51 6.7 -9 678.00 -55.0 -49.1 -54.0 66 -99 SPO 1997 10 14 04 19 51 6.7 -9 678.00 -54.9 -49.0 -54.0 65 -99 SPO 1997 10 14 04 20 50 6.6 -9 678.00 -54.9 -48.8 -54.0 65 -99 SPO 1997 10 14 04 21 51 6.5 -9 678.10 -54.8 -48.9 -53.9 64 -99 SPO 1997 10 14 04 22 51 6.4 -9 678.10 -54.8 -49.1 -53.9 64 -99 SPO 1997 10 14 04 23 52 6.3 -9 678.10 -54.8 -49.2 -53.8 65 -99 SPO 1997 10 14 04 24 52 6.2 -9 678.10 -54.7 -49.3 -53.8 64 -99 SPO 1997 10 14 04 25 53 6.1 -9 678.10 -54.8 -49.3 -53.8 66 -99 SPO 1997 10 14 04 26 53 6.2 -9 678.10 -54.8 -49.4 -53.8 66 -99 SPO 1997 10 14 04 27 53 6.3 -9 678.10 -54.8 -49.3 -53.9 66 -99 SPO 1997 10 14 04 28 52 6.6 -9 678.10 -54.8 -49.5 -54.0 66 -99 SPO 1997 10 14 04 29 52 6.6 -9 678.10 -54.8 -49.4 -54.0 66 -99 SPO 1997 10 14 04 30 52 6.6 -9 678.10 -54.8 -49.2 -54.0 66 -99 SPO 1997 10 14 04 31 52 6.6 -9 678.10 -54.9 -49.4 -54.0 66 -99 SPO 1997 10 14 04 32 53 6.5 -9 678.10 -54.9 -49.4 -54.1 65 -99 SPO 1997 10 14 04 33 54 6.4 -9 678.10 -54.9 -49.4 -54.0 65 -99 SPO 1997 10 14 04 34 55 6.5 -9 678.10 -54.9 -49.5 -54.0 65 -99 SPO 1997 10 14 04 35 54 6.4 -9 678.10 -54.9 -49.6 -54.1 65 -99 SPO 1997 10 14 04 36 53 6.3 -9 678.10 -55.0 -49.6 -54.1 66 -99 SPO 1997 10 14 04 37 53 6.4 -9 678.10 -54.9 -49.8 -54.1 66 -99 SPO 1997 10 14 04 38 53 6.5 -9 678.10 -54.9 -49.7 -54.1 66 -99 SPO 1997 10 14 04 39 52 6.5 -9 678.10 -54.9 -49.8 -54.2 66 -99 SPO 1997 10 14 04 40 52 6.6 -9 678.10 -54.8 -49.7 -54.1 66 -99 SPO 1997 10 14 04 41 53 6.6 -9 678.10 -54.8 -49.6 -54.1 66 -99 SPO 1997 10 14 04 42 52 6.6 -9 678.10 -54.8 -49.5 -54.1 66 -99 SPO 1997 10 14 04 43 52 6.7 -9 678.10 -54.8 -49.7 -54.1 66 -99 SPO 1997 10 14 04 44 52 6.5 -9 678.10 -54.7 -49.7 -54.1 65 -99 SPO 1997 10 14 04 45 52 6.5 -9 678.10 -54.8 -49.5 -54.2 66 -99 SPO 1997 10 14 04 46 53 6.4 -9 678.10 -54.8 -49.4 -54.2 66 -99 SPO 1997 10 14 04 47 53 6.6 -9 678.10 -54.8 -49.4 -54.2 66 -99 SPO 1997 10 14 04 48 52 6.7 -9 678.10 -54.7 -49.6 -54.2 65 -99 SPO 1997 10 14 04 49 51 6.7 -9 678.10 -54.7 -49.7 -54.2 66 -99 SPO 1997 10 14 04 50 52 6.6 -9 678.10 -54.7 -49.6 -54.2 66 -99 SPO 1997 10 14 04 51 54 6.7 -9 678.10 -54.6 -49.4 -54.2 65 -99 SPO 1997 10 14 04 52 54 6.7 -9 678.10 -54.7 -49.2 -54.2 66 -99 SPO 1997 10 14 04 53 53 6.7 -9 678.10 -54.7 -49.2 -54.2 66 -99 SPO 1997 10 14 04 54 52 6.7 -9 678.10 -54.7 -49.3 -54.2 66 -99 SPO 1997 10 14 04 55 51 6.7 -9 678.10 -54.7 -49.1 -54.2 66 -99 SPO 1997 10 14 04 56 51 6.8 -9 678.10 -54.6 -49.1 -54.2 64 -99 SPO 1997 10 14 04 57 51 7.0 -9 678.10 -54.6 -48.7 -54.2 64 -99 SPO 1997 10 14 04 58 52 7.1 -9 678.00 -54.5 -48.6 -54.2 63 -99 SPO 1997 10 14 04 59 52 7.0 -9 678.00 -54.5 -48.8 -54.2 64 -99 SPO 1997 10 14 05 00 53 7.0 -9 678.00 -54.5 -49.2 -54.2 64 0 SPO 1997 10 14 05 01 54 7.2 -9 678.00 -54.5 -49.1 -54.2 65 -99 SPO 1997 10 14 05 02 53 7.0 -9 678.10 -54.5 -49.3 -54.2 65 -99 SPO 1997 10 14 05 03 53 7.0 -9 678.10 -54.5 -49.4 -54.2 65 -99 SPO 1997 10 14 05 04 53 6.9 -9 678.10 -54.4 -49.3 -54.1 64 -99 SPO 1997 10 14 05 05 53 7.0 -9 678.10 -54.4 -49.6 -54.1 66 -99 SPO 1997 10 14 05 06 53 7.0 -9 678.10 -54.4 -49.6 -54.1 66 -99 SPO 1997 10 14 05 07 54 6.9 -9 678.10 -54.4 -49.5 -54.1 66 -99 SPO 1997 10 14 05 08 53 7.0 -9 678.10 -54.4 -49.6 -54.1 66 -99 SPO 1997 10 14 05 09 53 7.0 -9 678.00 -54.4 -49.6 -54.1 66 -99 SPO 1997 10 14 05 10 53 7.0 -9 678.00 -54.5 -49.4 -54.1 66 -99 SPO 1997 10 14 05 11 52 7.1 -9 678.00 -54.5 -49.6 -54.1 66 -99 SPO 1997 10 14 05 12 52 7.1 -9 678.00 -54.4 -49.6 -54.1 66 -99 SPO 1997 10 14 05 13 52 7.2 -9 678.00 -54.3 -49.5 -54.0 65 -99 SPO 1997 10 14 05 14 51 7.0 -9 678.00 -54.3 -49.5 -54.0 66 -99 SPO 1997 10 14 05 15 51 6.8 -9 678.00 -54.4 -49.6 -54.0 67 -99 SPO 1997 10 14 05 16 52 6.7 -9 678.00 -54.4 -49.7 -54.0 67 -99 SPO 1997 10 14 05 17 54 6.7 -9 678.00 -54.4 -49.7 -54.0 67 -99 SPO 1997 10 14 05 18 54 6.7 -9 678.00 -54.4 -49.8 -54.0 67 -99 SPO 1997 10 14 05 19 53 6.7 -9 678.00 -54.4 -49.7 -54.1 67 -99 SPO 1997 10 14 05 20 52 6.7 -9 678.00 -54.3 -49.6 -54.0 65 -99 SPO 1997 10 14 05 21 52 6.7 -9 678.10 -54.3 -49.8 -54.0 65 -99 SPO 1997 10 14 05 22 53 6.7 -9 678.10 -54.3 -50.0 -54.0 65 -99 SPO 1997 10 14 05 23 54 6.5 -9 678.10 -54.4 -50.1 -54.0 67 -99 SPO 1997 10 14 05 24 54 6.3 -9 678.10 -54.4 -50.4 -54.0 67 -99 SPO 1997 10 14 05 25 54 6.5 -9 678.10 -54.5 -50.5 -54.1 67 -99 SPO 1997 10 14 05 26 55 6.6 -9 678.10 -54.5 -50.4 -54.1 66 -99 SPO 1997 10 14 05 27 58 6.5 -9 678.10 -54.5 -50.5 -54.1 66 -99 SPO 1997 10 14 05 28 60 6.2 -9 678.10 -54.6 -50.6 -54.1 67 -99 SPO 1997 10 14 05 29 60 6.2 -9 678.10 -54.6 -50.9 -54.2 67 -99 SPO 1997 10 14 05 30 60 6.3 -9 678.10 -54.7 -51.0 -54.2 66 -99 SPO 1997 10 14 05 31 59 6.2 -9 678.10 -54.8 -51.0 -54.3 66 -99 SPO 1997 10 14 05 32 59 6.0 -9 678.10 -54.8 -51.0 -54.3 66 -99 SPO 1997 10 14 05 33 62 6.1 -9 678.10 -54.8 -50.7 -54.3 65 -99 SPO 1997 10 14 05 34 61 5.7 -9 678.10 -54.8 -50.8 -54.3 65 -99 SPO 1997 10 14 05 35 61 5.9 -9 678.10 -54.8 -50.9 -54.3 64 -99 SPO 1997 10 14 05 36 61 6.1 -9 678.10 -54.8 -50.8 -54.3 64 -99 SPO 1997 10 14 05 37 61 6.1 -9 678.10 -54.8 -50.8 -54.4 64 -99 SPO 1997 10 14 05 38 61 6.0 -9 678.10 -54.9 -50.7 -54.4 65 -99 SPO 1997 10 14 05 39 60 6.0 -9 678.10 -54.9 -50.7 -54.4 65 -99 SPO 1997 10 14 05 40 60 5.8 -9 678.10 -55.0 -50.8 -54.4 66 -99 SPO 1997 10 14 05 41 61 5.5 -9 678.10 -55.0 -50.8 -54.4 66 -99 SPO 1997 10 14 05 42 61 5.5 -9 678.10 -55.1 -50.8 -54.5 66 -99 SPO 1997 10 14 05 43 60 5.6 -9 678.10 -55.1 -50.8 -54.5 66 -99 SPO 1997 10 14 05 44 60 5.8 -9 678.10 -55.2 -50.7 -54.5 66 -99 SPO 1997 10 14 05 45 59 5.9 -9 678.10 -55.2 -50.6 -54.5 66 -99 SPO 1997 10 14 05 46 59 5.9 -9 678.10 -55.2 -50.6 -54.6 64 -99 SPO 1997 10 14 05 47 57 6.0 -9 678.10 -55.2 -50.5 -54.6 65 -99 SPO 1997 10 14 05 48 58 5.9 -9 678.10 -55.2 -50.4 -54.6 64 -99 SPO 1997 10 14 05 49 58 5.8 -9 678.20 -55.2 -50.4 -54.6 65 -99 SPO 1997 10 14 05 50 60 5.5 -9 678.20 -55.2 -50.4 -54.5 65 -99 SPO 1997 10 14 05 51 61 5.4 -9 678.20 -55.3 -50.5 -54.6 65 -99 SPO 1997 10 14 05 52 61 5.4 -9 678.20 -55.4 -50.5 -54.6 66 -99 SPO 1997 10 14 05 53 61 5.4 -9 678.20 -55.4 -50.4 -54.6 65 -99 SPO 1997 10 14 05 54 61 5.4 -9 678.20 -55.3 -50.4 -54.5 65 -99 SPO 1997 10 14 05 55 60 5.5 -9 678.20 -55.4 -50.5 -54.5 65 -99 SPO 1997 10 14 05 56 60 5.6 -9 678.20 -55.4 -50.5 -54.6 65 -99 SPO 1997 10 14 05 57 60 5.6 -9 678.20 -55.4 -50.5 -54.5 65 -99 SPO 1997 10 14 05 58 60 5.5 -9 678.20 -55.3 -50.5 -54.5 63 -99 SPO 1997 10 14 05 59 59 5.5 -9 678.20 -55.3 -50.5 -54.4 63 -99 SPO 1997 10 14 06 00 59 5.5 -9 678.20 -55.3 -50.4 -54.4 64 0 SPO 1997 10 14 06 01 59 5.3 -9 678.20 -55.3 -50.4 -54.4 64 -99 SPO 1997 10 14 06 02 60 5.2 -9 678.20 -55.4 -50.5 -54.4 65 -99 SPO 1997 10 14 06 03 61 5.3 -9 678.20 -55.5 -50.6 -54.4 66 -99 SPO 1997 10 14 06 04 62 5.3 -9 678.20 -55.4 -50.6 -54.5 65 -99 SPO 1997 10 14 06 05 62 5.5 -9 678.20 -55.5 -50.6 -54.5 65 -99 SPO 1997 10 14 06 06 61 5.6 -9 678.20 -55.5 -50.6 -54.5 65 -99 SPO 1997 10 14 06 07 61 5.5 -9 678.20 -55.5 -50.6 -54.4 65 -99 SPO 1997 10 14 06 08 61 5.6 -9 678.20 -55.4 -50.6 -54.4 64 -99 SPO 1997 10 14 06 09 61 5.6 -9 678.20 -55.4 -50.5 -54.4 63 -99 SPO 1997 10 14 06 10 61 5.5 -9 678.20 -55.4 -50.5 -54.4 62 -99 SPO 1997 10 14 06 11 62 5.7 -9 678.20 -55.4 -50.6 -54.4 62 -99 SPO 1997 10 14 06 12 63 5.6 -9 678.20 -55.4 -50.6 -54.4 63 -99 SPO 1997 10 14 06 13 64 5.6 -9 678.20 -55.5 -50.8 -54.4 64 -99 SPO 1997 10 14 06 14 65 5.5 -9 678.20 -55.6 -50.8 -54.5 65 -99 SPO 1997 10 14 06 15 65 5.4 -9 678.20 -55.6 -50.9 -54.5 65 -99 SPO 1997 10 14 06 16 65 5.3 -9 678.20 -55.6 -51.0 -54.5 65 -99 SPO 1997 10 14 06 17 64 5.5 -9 678.20 -55.7 -51.0 -54.5 66 -99 SPO 1997 10 14 06 18 64 5.6 -9 678.10 -55.7 -51.0 -54.5 66 -99 SPO 1997 10 14 06 19 65 5.4 -9 678.10 -55.6 -51.0 -54.5 65 -99 SPO 1997 10 14 06 20 65 5.4 -9 678.10 -55.6 -51.1 -54.5 65 -99 SPO 1997 10 14 06 21 64 5.4 -9 678.20 -55.6 -51.2 -54.5 65 -99 SPO 1997 10 14 06 22 63 5.4 -9 678.20 -55.7 -51.3 -54.5 65 -99 SPO 1997 10 14 06 23 65 5.5 -9 678.20 -55.6 -51.2 -54.5 64 -99 SPO 1997 10 14 06 24 66 5.3 -9 678.20 -55.6 -51.3 -54.4 64 -99 SPO 1997 10 14 06 25 68 5.2 -9 678.20 -55.7 -51.3 -54.5 65 -99 SPO 1997 10 14 06 26 69 5.0 -9 678.20 -55.7 -51.3 -54.5 65 -99 SPO 1997 10 14 06 27 69 5.1 -9 678.20 -55.7 -51.4 -54.5 64 -99 SPO 1997 10 14 06 28 69 5.1 -9 678.20 -55.8 -51.4 -54.5 65 -99 SPO 1997 10 14 06 29 69 5.3 -9 678.20 -55.8 -51.2 -54.5 65 -99 SPO 1997 10 14 06 30 68 5.4 -9 678.20 -55.8 -51.1 -54.5 65 -99 SPO 1997 10 14 06 31 70 5.5 -9 678.20 -55.8 -51.1 -54.6 65 -99 SPO 1997 10 14 06 32 72 5.5 -9 678.20 -55.8 -51.3 -54.6 65 -99 SPO 1997 10 14 06 33 74 5.5 -9 678.20 -55.8 -51.4 -54.5 65 -99 SPO 1997 10 14 06 34 74 5.5 -9 678.20 -55.9 -51.4 -54.5 65 -99 SPO 1997 10 14 06 35 72 5.6 -9 678.20 -56.0 -51.4 -54.6 64 -99 SPO 1997 10 14 06 36 71 5.5 -9 678.20 -55.9 -51.4 -54.6 63 -99 SPO 1997 10 14 06 37 70 5.6 -9 678.20 -55.8 -51.3 -54.6 62 -99 SPO 1997 10 14 06 38 68 5.7 -9 678.20 -55.7 -51.3 -54.6 61 -99 SPO 1997 10 14 06 39 68 5.6 -9 678.20 -55.7 -51.3 -54.6 62 -99 SPO 1997 10 14 06 40 68 5.6 -9 678.20 -55.8 -51.3 -54.7 64 -99 SPO 1997 10 14 06 41 66 5.7 -9 678.20 -55.8 -51.3 -54.7 64 -99 SPO 1997 10 14 06 42 67 5.7 -9 678.20 -55.8 -51.2 -54.6 65 -99 SPO 1997 10 14 06 43 68 5.7 -9 678.20 -55.7 -51.2 -54.7 64 -99 SPO 1997 10 14 06 44 69 5.8 -9 678.20 -55.7 -51.1 -54.7 64 -99 SPO 1997 10 14 06 45 69 5.7 -9 678.20 -55.7 -51.1 -54.7 64 -99 SPO 1997 10 14 06 46 70 5.6 -9 678.20 -55.8 -51.2 -54.7 65 -99 SPO 1997 10 14 06 47 69 5.7 -9 678.20 -55.7 -51.3 -54.7 63 -99 SPO 1997 10 14 06 48 69 5.7 -9 678.20 -55.8 -51.2 -54.7 64 -99 SPO 1997 10 14 06 49 68 5.7 -9 678.20 -55.8 -51.2 -54.7 64 -99 SPO 1997 10 14 06 50 68 5.6 -9 678.20 -55.8 -51.3 -54.7 63 -99 SPO 1997 10 14 06 51 68 5.6 -9 678.20 -55.8 -51.4 -54.7 63 -99 SPO 1997 10 14 06 52 67 5.7 -9 678.20 -55.8 -51.4 -54.8 63 -99 SPO 1997 10 14 06 53 67 5.8 -9 678.20 -55.9 -51.4 -54.8 64 -99 SPO 1997 10 14 06 54 67 5.8 -9 678.20 -55.9 -51.3 -54.8 65 -99 SPO 1997 10 14 06 55 67 5.8 -9 678.20 -55.8 -51.3 -54.8 64 -99 SPO 1997 10 14 06 56 67 5.8 -9 678.20 -55.8 -51.3 -54.8 64 -99 SPO 1997 10 14 06 57 67 5.8 -9 678.20 -55.8 -51.3 -54.8 64 -99 SPO 1997 10 14 06 58 67 5.7 -9 678.20 -55.9 -51.3 -54.8 65 -99 SPO 1997 10 14 06 59 66 5.5 -9 678.20 -55.9 -51.2 -54.8 65 -99 SPO 1997 10 14 07 00 66 5.6 -9 678.20 -55.8 -51.2 -54.8 64 0 SPO 1997 10 14 07 01 66 5.5 -9 678.20 -55.8 -51.2 -54.8 63 -99 SPO 1997 10 14 07 02 66 5.3 -9 678.20 -55.8 -51.2 -54.7 62 -99 SPO 1997 10 14 07 03 66 5.2 -9 678.20 -55.8 -51.2 -54.7 62 -99 SPO 1997 10 14 07 04 67 5.1 -9 678.20 -55.9 -51.2 -54.7 63 -99 SPO 1997 10 14 07 05 68 5.1 -9 678.30 -55.9 -51.2 -54.7 64 -99 SPO 1997 10 14 07 06 70 4.9 -9 678.30 -56.0 -51.2 -54.7 65 -99 SPO 1997 10 14 07 07 70 4.8 -9 678.30 -56.0 -51.4 -54.7 65 -99 SPO 1997 10 14 07 08 70 4.8 -9 678.30 -56.0 -51.4 -54.7 65 -99 SPO 1997 10 14 07 09 71 4.8 -9 678.30 -56.1 -51.6 -54.7 64 -99 SPO 1997 10 14 07 10 72 4.8 -9 678.30 -56.2 -51.6 -54.7 64 -99 SPO 1997 10 14 07 11 72 4.7 -9 678.30 -56.3 -51.7 -54.6 65 -99 SPO 1997 10 14 07 12 73 4.5 -9 678.30 -56.3 -51.8 -54.6 64 -99 SPO 1997 10 14 07 13 75 4.5 -9 678.30 -56.4 -52.0 -54.5 65 -99 SPO 1997 10 14 07 14 76 4.4 -9 678.30 -56.5 -52.2 -54.4 64 -99 SPO 1997 10 14 07 15 75 4.3 -9 678.30 -56.6 -52.2 -54.6 64 -99 SPO 1997 10 14 07 16 72 4.2 -9 678.30 -56.8 -52.1 -54.6 65 -99 SPO 1997 10 14 07 17 72 4.2 -9 678.30 -57.0 -52.1 -54.6 65 -99 SPO 1997 10 14 07 18 72 4.3 -9 678.30 -57.2 -52.2 -54.6 65 -99 SPO 1997 10 14 07 19 74 4.5 -9 678.30 -57.2 -52.3 -54.8 64 -99 SPO 1997 10 14 07 20 73 4.6 -9 678.30 -57.0 -52.2 -54.8 63 -99 SPO 1997 10 14 07 21 72 4.5 -9 678.30 -57.3 -52.1 -54.9 65 -99 SPO 1997 10 14 07 22 73 4.6 -9 678.30 -57.1 -52.2 -54.9 63 -99 SPO 1997 10 14 07 23 73 4.4 -9 678.30 -57.0 -52.3 -54.9 63 -99 SPO 1997 10 14 07 24 71 4.1 -9 678.30 -57.4 -52.5 -55.0 66 -99 SPO 1997 10 14 07 25 70 4.3 -9 678.30 -57.8 -52.5 -55.1 68 -99 SPO 1997 10 14 07 26 71 4.5 -9 678.30 -57.7 -52.3 -55.2 66 -99 SPO 1997 10 14 07 27 71 4.6 -9 678.30 -57.5 -52.2 -55.2 63 -99 SPO 1997 10 14 07 28 72 4.6 -9 678.30 -57.3 -52.2 -55.2 62 -99 SPO 1997 10 14 07 29 73 4.5 -9 678.30 -57.3 -52.2 -55.2 61 -99 SPO 1997 10 14 07 30 73 4.4 -9 678.30 -57.3 -52.2 -55.2 61 -99 SPO 1997 10 14 07 31 74 4.3 -9 678.30 -57.3 -52.3 -55.1 62 -99 SPO 1997 10 14 07 32 76 4.2 -9 678.30 -57.3 -52.3 -55.2 62 -99 SPO 1997 10 14 07 33 77 4.1 -9 678.30 -57.4 -52.4 -55.2 63 -99 SPO 1997 10 14 07 34 78 4.0 -9 678.30 -57.6 -52.5 -55.4 64 -99 SPO 1997 10 14 07 35 79 4.1 -9 678.30 -57.8 -52.6 -55.6 65 -99 SPO 1997 10 14 07 36 76 4.2 -9 678.30 -57.8 -52.6 -55.6 64 -99 SPO 1997 10 14 07 37 73 4.2 -9 678.30 -57.6 -52.5 -55.5 62 -99 SPO 1997 10 14 07 38 71 4.2 -9 678.30 -57.5 -52.4 -55.3 61 -99 SPO 1997 10 14 07 39 71 4.1 -9 678.30 -57.5 -52.4 -55.2 62 -99 SPO 1997 10 14 07 40 72 4.1 -9 678.30 -57.6 -52.5 -55.2 63 -99 SPO 1997 10 14 07 41 72 4.1 -9 678.30 -57.7 -52.6 -55.3 64 -99 SPO 1997 10 14 07 42 74 4.2 -9 678.30 -57.8 -52.6 -55.4 63 -99 SPO 1997 10 14 07 43 74 4.3 -9 678.30 -57.8 -52.7 -55.5 62 -99 SPO 1997 10 14 07 44 75 4.2 -9 678.30 -57.8 -52.7 -55.5 61 -99 SPO 1997 10 14 07 45 74 4.3 -9 678.30 -57.8 -52.8 -55.5 61 -99 SPO 1997 10 14 07 46 74 4.3 -9 678.30 -57.7 -52.8 -55.6 61 -99 SPO 1997 10 14 07 47 75 4.4 -9 678.30 -57.6 -52.7 -55.5 60 -99 SPO 1997 10 14 07 48 76 4.5 -9 678.30 -57.5 -52.8 -55.4 61 -99 SPO 1997 10 14 07 49 77 4.5 -9 678.30 -57.4 -52.8 -55.4 61 -99 SPO 1997 10 14 07 50 76 4.4 -9 678.30 -57.4 -52.9 -55.4 62 -99 SPO 1997 10 14 07 51 76 4.4 -9 678.20 -57.4 -52.9 -55.4 63 -99 SPO 1997 10 14 07 52 75 4.3 -9 678.20 -57.3 -52.9 -55.2 62 -99 SPO 1997 10 14 07 53 74 4.4 -9 678.20 -57.2 -52.8 -55.2 62 -99 SPO 1997 10 14 07 54 74 4.2 -9 678.30 -57.2 -52.9 -55.1 62 -99 SPO 1997 10 14 07 55 76 4.1 -9 678.30 -57.1 -53.0 -55.0 61 -99 SPO 1997 10 14 07 56 77 4.1 -9 678.20 -57.2 -53.1 -55.0 61 -99 SPO 1997 10 14 07 57 76 4.1 -9 678.20 -57.2 -53.2 -55.0 62 -99 SPO 1997 10 14 07 58 72 4.1 -9 678.20 -57.2 -53.2 -55.0 62 -99 SPO 1997 10 14 07 59 71 4.0 -9 678.20 -57.1 -53.1 -54.9 61 -99 SPO 1997 10 14 08 00 73 3.9 -9 678.30 -57.0 -53.0 -54.8 62 0 SPO 1997 10 14 08 01 74 3.9 -9 678.30 -56.9 -53.0 -54.8 63 -99 SPO 1997 10 14 08 02 72 4.0 -9 678.30 -56.8 -53.0 -54.6 62 -99 SPO 1997 10 14 08 03 71 4.0 -9 678.30 -56.8 -53.0 -54.7 63 -99 SPO 1997 10 14 08 04 68 3.9 -9 678.30 -56.8 -53.0 -54.8 64 -99 SPO 1997 10 14 08 05 67 3.7 -9 678.30 -56.9 -53.0 -54.9 65 -99 SPO 1997 10 14 08 06 67 3.7 -9 678.30 -56.9 -53.0 -54.9 65 -99 SPO 1997 10 14 08 07 66 3.6 -9 678.30 -57.0 -53.0 -54.8 66 -99 SPO 1997 10 14 08 08 65 3.6 -9 678.30 -57.0 -53.1 -54.7 66 -99 SPO 1997 10 14 08 09 64 3.6 -9 678.30 -57.0 -53.1 -54.7 65 -99 SPO 1997 10 14 08 10 64 3.6 -9 678.30 -56.9 -53.2 -54.6 64 -99 SPO 1997 10 14 08 11 65 3.7 -9 678.30 -56.9 -53.2 -54.6 65 -99 SPO 1997 10 14 08 12 66 3.6 -9 678.30 -56.8 -53.1 -54.6 64 -99 SPO 1997 10 14 08 13 67 3.5 -9 678.30 -56.9 -53.1 -54.6 65 -99 SPO 1997 10 14 08 14 68 3.5 -9 678.40 -56.8 -53.1 -54.5 65 -99 SPO 1997 10 14 08 15 67 3.5 -9 678.40 -56.7 -53.1 -54.5 64 -99 SPO 1997 10 14 08 16 66 3.6 -9 678.40 -56.8 -53.1 -54.5 66 -99 SPO 1997 10 14 08 17 62 3.7 -9 678.40 -57.0 -53.1 -54.6 68 -99 SPO 1997 10 14 08 18 62 3.8 -9 678.40 -57.0 -53.1 -54.6 68 -99 SPO 1997 10 14 08 19 60 3.9 -9 678.40 -56.9 -53.1 -54.7 68 -99 SPO 1997 10 14 08 20 60 4.0 -9 678.40 -56.9 -53.0 -54.8 68 -99 SPO 1997 10 14 08 21 60 4.0 -9 678.40 -57.0 -53.0 -54.8 68 -99 SPO 1997 10 14 08 22 61 4.2 -9 678.30 -57.0 -52.9 -54.9 68 -99 SPO 1997 10 14 08 23 60 4.3 -9 678.30 -57.0 -52.8 -55.0 68 -99 SPO 1997 10 14 08 24 60 4.3 -9 678.30 -57.0 -52.6 -55.0 68 -99 SPO 1997 10 14 08 25 61 4.3 -9 678.30 -56.9 -52.7 -54.9 66 -99 SPO 1997 10 14 08 26 63 4.2 -9 678.30 -56.9 -52.6 -54.9 65 -99 SPO 1997 10 14 08 27 62 4.1 -9 678.40 -56.8 -52.7 -54.9 65 -99 SPO 1997 10 14 08 28 61 4.3 -9 678.40 -56.8 -52.7 -54.9 65 -99 SPO 1997 10 14 08 29 61 4.4 -9 678.40 -56.8 -52.8 -54.9 66 -99 SPO 1997 10 14 08 30 61 4.4 -9 678.30 -56.8 -52.8 -54.9 67 -99 SPO 1997 10 14 08 31 60 4.6 -9 678.30 -56.7 -52.8 -54.9 66 -99 SPO 1997 10 14 08 32 59 4.6 -9 678.30 -56.7 -52.8 -55.0 66 -99 SPO 1997 10 14 08 33 57 4.6 -9 678.30 -56.6 -52.8 -55.0 65 -99 SPO 1997 10 14 08 34 58 4.8 -9 678.30 -56.6 -52.8 -55.0 66 -99 SPO 1997 10 14 08 35 57 5.0 -9 678.30 -56.6 -52.6 -55.0 66 -99 SPO 1997 10 14 08 36 56 5.1 -9 678.30 -56.5 -52.4 -55.0 65 -99 SPO 1997 10 14 08 37 56 5.2 -9 678.30 -56.5 -52.3 -55.0 65 -99 SPO 1997 10 14 08 38 56 5.1 -9 678.30 -56.5 -52.2 -55.0 66 -99 SPO 1997 10 14 08 39 58 5.0 -9 678.30 -56.4 -52.2 -55.0 65 -99 SPO 1997 10 14 08 40 59 4.9 -9 678.30 -56.4 -52.2 -55.0 66 -99 SPO 1997 10 14 08 41 59 4.8 -9 678.30 -56.4 -52.3 -55.0 67 -99 SPO 1997 10 14 08 42 58 4.9 -9 678.30 -56.4 -52.3 -55.0 67 -99 SPO 1997 10 14 08 43 57 4.8 -9 678.30 -56.4 -52.2 -55.0 67 -99 SPO 1997 10 14 08 44 56 4.8 -9 678.40 -56.4 -52.2 -54.9 67 -99 SPO 1997 10 14 08 45 55 4.7 -9 678.40 -56.4 -52.3 -54.9 67 -99 SPO 1997 10 14 08 46 56 4.6 -9 678.40 -56.4 -52.3 -54.9 67 -99 SPO 1997 10 14 08 47 54 4.5 -9 678.40 -56.4 -52.2 -54.9 67 -99 SPO 1997 10 14 08 48 55 4.5 -9 678.40 -56.4 -52.2 -54.9 67 -99 SPO 1997 10 14 08 49 57 4.5 -9 678.40 -56.4 -52.2 -54.9 67 -99 SPO 1997 10 14 08 50 59 4.4 -9 678.40 -56.5 -52.1 -54.9 67 -99 SPO 1997 10 14 08 51 60 4.2 -9 678.40 -56.6 -52.2 -54.9 67 -99 SPO 1997 10 14 08 52 59 4.1 -9 678.40 -56.6 -52.4 -54.9 66 -99 SPO 1997 10 14 08 53 59 4.2 -9 678.40 -56.6 -52.6 -54.9 66 -99 SPO 1997 10 14 08 54 61 4.1 -9 678.50 -56.7 -52.6 -54.9 67 -99 SPO 1997 10 14 08 55 62 3.9 -9 678.50 -56.7 -52.6 -54.9 67 -99 SPO 1997 10 14 08 56 62 3.8 -9 678.50 -56.7 -52.8 -54.8 67 -99 SPO 1997 10 14 08 57 62 3.8 -9 678.50 -56.8 -52.8 -54.8 68 -99 SPO 1997 10 14 08 58 62 3.9 -9 678.50 -56.8 -52.9 -54.8 68 -99 SPO 1997 10 14 08 59 62 3.9 -9 678.50 -56.8 -52.8 -54.8 67 -99 SPO 1997 10 14 09 00 62 3.9 -9 678.50 -56.9 -52.9 -54.8 68 0 SPO 1997 10 14 09 01 63 3.9 -9 678.50 -57.0 -52.9 -54.8 68 -99 SPO 1997 10 14 09 02 63 3.9 -9 678.50 -57.0 -52.8 -54.8 67 -99 SPO 1997 10 14 09 03 64 3.7 -9 678.50 -57.1 -52.8 -54.6 66 -99 SPO 1997 10 14 09 04 65 3.7 -9 678.50 -57.2 -53.0 -54.6 65 -99 SPO 1997 10 14 09 05 64 3.8 -9 678.50 -57.3 -53.0 -54.5 65 -99 SPO 1997 10 14 09 06 65 3.8 -9 678.50 -57.3 -53.0 -54.6 65 -99 SPO 1997 10 14 09 07 65 3.8 -9 678.50 -57.2 -52.9 -54.6 64 -99 SPO 1997 10 14 09 08 63 3.9 -9 678.50 -57.2 -52.9 -54.7 64 -99 SPO 1997 10 14 09 09 63 3.9 -9 678.50 -57.0 -53.0 -54.8 63 -99 SPO 1997 10 14 09 10 63 4.0 -9 678.50 -57.0 -53.0 -54.8 63 -99 SPO 1997 10 14 09 11 61 3.8 -9 678.50 -56.9 -52.9 -54.8 64 -99 SPO 1997 10 14 09 12 62 3.8 -9 678.50 -56.9 -52.8 -54.9 64 -99 SPO 1997 10 14 09 13 60 3.9 -9 678.50 -57.0 -52.8 -54.9 66 -99 SPO 1997 10 14 09 14 61 3.9 -9 678.50 -57.0 -52.6 -55.0 65 -99 SPO 1997 10 14 09 15 60 4.0 -9 678.50 -57.2 -52.6 -55.0 67 -99 SPO 1997 10 14 09 16 61 4.0 -9 678.50 -57.2 -52.6 -55.1 67 -99 SPO 1997 10 14 09 17 62 4.0 -9 678.50 -57.1 -52.5 -55.1 65 -99 SPO 1997 10 14 09 18 63 4.2 -9 678.50 -57.2 -52.6 -55.1 66 -99 SPO 1997 10 14 09 19 63 4.2 -9 678.50 -57.2 -52.6 -55.2 66 -99 SPO 1997 10 14 09 20 64 4.2 -9 678.50 -57.2 -52.6 -55.2 67 -99 SPO 1997 10 14 09 21 64 4.2 -9 678.50 -57.1 -52.6 -55.2 66 -99 SPO 1997 10 14 09 22 64 4.2 -9 678.50 -57.1 -52.7 -55.2 66 -99 SPO 1997 10 14 09 23 63 4.1 -9 678.50 -57.1 -52.5 -55.1 66 -99 SPO 1997 10 14 09 24 62 4.0 -9 678.50 -57.1 -52.5 -55.0 66 -99 SPO 1997 10 14 09 25 62 4.1 -9 678.50 -57.0 -52.4 -55.0 65 -99 SPO 1997 10 14 09 26 61 4.1 -9 678.50 -57.0 -52.3 -55.0 65 -99 SPO 1997 10 14 09 27 60 4.1 -9 678.50 -57.1 -52.3 -55.0 66 -99 SPO 1997 10 14 09 28 60 4.3 -9 678.50 -57.1 -52.3 -55.0 67 -99 SPO 1997 10 14 09 29 59 4.4 -9 678.50 -57.0 -52.2 -55.0 66 -99 SPO 1997 10 14 09 30 59 4.3 -9 678.50 -57.0 -52.1 -55.1 65 -99 SPO 1997 10 14 09 31 61 4.3 -9 678.50 -57.1 -52.1 -55.1 66 -99 SPO 1997 10 14 09 32 63 4.2 -9 678.50 -57.0 -52.2 -55.1 66 -99 SPO 1997 10 14 09 33 64 4.0 -9 678.50 -57.1 -52.3 -55.0 67 -99 SPO 1997 10 14 09 34 64 4.1 -9 678.50 -57.2 -52.5 -55.0 67 -99 SPO 1997 10 14 09 35 66 4.2 -9 678.50 -57.3 -52.6 -55.0 67 -99 SPO 1997 10 14 09 36 65 4.4 -9 678.50 -57.3 -52.7 -55.2 67 -99 SPO 1997 10 14 09 37 64 4.5 -9 678.50 -57.4 -52.8 -55.4 67 -99 SPO 1997 10 14 09 38 64 4.5 -9 678.50 -57.4 -52.8 -55.4 67 -99 SPO 1997 10 14 09 39 64 4.4 -9 678.50 -57.5 -52.8 -55.5 67 -99 SPO 1997 10 14 09 40 65 4.4 -9 678.50 -57.5 -52.8 -55.5 67 -99 SPO 1997 10 14 09 41 66 4.3 -9 678.50 -57.5 -52.8 -55.4 67 -99 SPO 1997 10 14 09 42 67 4.2 -9 678.50 -57.5 -52.8 -55.3 66 -99 SPO 1997 10 14 09 43 67 4.1 -9 678.50 -57.5 -52.8 -55.2 66 -99 SPO 1997 10 14 09 44 67 4.1 -9 678.50 -57.4 -52.7 -55.2 64 -99 SPO 1997 10 14 09 45 65 4.2 -9 678.50 -57.4 -52.8 -55.2 63 -99 SPO 1997 10 14 09 46 65 4.3 -9 678.50 -57.4 -52.8 -55.3 63 -99 SPO 1997 10 14 09 47 65 4.3 -9 678.50 -57.4 -52.9 -55.4 64 -99 SPO 1997 10 14 09 48 65 4.3 -9 678.50 -57.3 -52.8 -55.3 64 -99 SPO 1997 10 14 09 49 63 4.3 -9 678.50 -57.3 -52.8 -55.3 64 -99 SPO 1997 10 14 09 50 64 4.2 -9 678.50 -57.3 -52.8 -55.2 65 -99 SPO 1997 10 14 09 51 64 4.3 -9 678.50 -57.2 -52.7 -55.2 64 -99 SPO 1997 10 14 09 52 63 4.3 -9 678.50 -57.2 -52.6 -55.2 65 -99 SPO 1997 10 14 09 53 62 4.4 -9 678.50 -57.3 -52.7 -55.3 66 -99 SPO 1997 10 14 09 54 62 4.5 -9 678.50 -57.3 -52.7 -55.3 66 -99 SPO 1997 10 14 09 55 62 4.4 -9 678.50 -57.3 -52.7 -55.4 66 -99 SPO 1997 10 14 09 56 63 4.4 -9 678.50 -57.3 -52.7 -55.4 65 -99 SPO 1997 10 14 09 57 63 4.4 -9 678.50 -57.3 -52.7 -55.4 65 -99 SPO 1997 10 14 09 58 63 4.3 -9 678.50 -57.4 -52.7 -55.4 65 -99 SPO 1997 10 14 09 59 63 4.3 -9 678.50 -57.4 -52.8 -55.4 66 -99 SPO 1997 10 14 10 00 63 4.3 -9 678.50 -57.4 -52.8 -55.4 66 0 SPO 1997 10 14 10 01 64 4.3 -9 678.50 -57.4 -52.8 -55.4 66 -99 SPO 1997 10 14 10 02 66 4.3 -9 678.50 -57.4 -52.8 -55.3 66 -99 SPO 1997 10 14 10 03 66 4.3 -9 678.50 -57.4 -52.8 -55.2 65 -99 SPO 1997 10 14 10 04 66 4.4 -9 678.50 -57.4 -52.8 -55.2 65 -99 SPO 1997 10 14 10 05 67 4.4 -9 678.50 -57.4 -52.8 -55.2 63 -99 SPO 1997 10 14 10 06 66 4.3 -9 678.50 -57.4 -52.8 -55.2 63 -99 SPO 1997 10 14 10 07 69 4.3 -9 678.50 -57.4 -53.0 -55.2 63 -99 SPO 1997 10 14 10 08 69 4.3 -9 678.50 -57.3 -53.0 -55.1 63 -99 SPO 1997 10 14 10 09 69 4.2 -9 678.50 -57.3 -53.1 -55.2 63 -99 SPO 1997 10 14 10 10 69 4.2 -9 678.50 -57.3 -53.1 -55.3 63 -99 SPO 1997 10 14 10 11 68 4.1 -9 678.50 -57.2 -53.0 -55.3 63 -99 SPO 1997 10 14 10 12 67 3.9 -9 678.50 -57.3 -52.9 -55.4 64 -99 SPO 1997 10 14 10 13 68 4.0 -9 678.50 -57.4 -52.9 -55.4 66 -99 SPO 1997 10 14 10 14 69 4.0 -9 678.50 -57.4 -53.1 -55.4 66 -99 SPO 1997 10 14 10 15 70 3.9 -9 678.50 -57.4 -53.2 -55.4 66 -99 SPO 1997 10 14 10 16 70 3.9 -9 678.50 -57.4 -53.4 -55.3 66 -99 SPO 1997 10 14 10 17 69 4.0 -9 678.50 -57.5 -53.3 -55.4 66 -99 SPO 1997 10 14 10 18 67 4.1 -9 678.50 -57.5 -53.1 -55.5 65 -99 SPO 1997 10 14 10 19 65 4.2 -9 678.50 -57.5 -52.9 -55.6 65 -99 SPO 1997 10 14 10 20 63 4.3 -9 678.50 -57.6 -52.9 -55.6 67 -99 SPO 1997 10 14 10 21 64 4.5 -9 678.50 -57.6 -52.8 -55.6 67 -99 SPO 1997 10 14 10 22 64 4.4 -9 678.50 -57.6 -52.9 -55.6 66 -99 SPO 1997 10 14 10 23 62 4.4 -9 678.50 -57.6 -53.0 -55.6 66 -99 SPO 1997 10 14 10 24 61 4.3 -9 678.50 -57.5 -53.0 -55.6 65 -99 SPO 1997 10 14 10 25 60 4.3 -9 678.50 -57.6 -53.0 -55.6 66 -99 SPO 1997 10 14 10 26 62 4.3 -9 678.50 -57.6 -53.1 -55.6 66 -99 SPO 1997 10 14 10 27 64 4.4 -9 678.50 -57.6 -53.0 -55.6 66 -99 SPO 1997 10 14 10 28 63 4.4 -9 678.50 -57.6 -53.0 -55.7 67 -99 SPO 1997 10 14 10 29 63 4.2 -9 678.50 -57.8 -52.9 -55.7 69 -99 SPO 1997 10 14 10 30 65 4.4 -9 678.50 -57.6 -52.9 -55.7 67 -99 SPO 1997 10 14 10 31 66 4.1 -9 678.50 -57.6 -53.0 -55.7 68 -99 SPO 1997 10 14 10 32 67 4.1 -9 678.50 -57.6 -53.1 -55.6 68 -99 SPO 1997 10 14 10 33 67 4.2 -9 678.60 -57.6 -53.0 -55.6 67 -99 SPO 1997 10 14 10 34 68 4.1 -9 678.60 -57.6 -53.2 -55.5 67 -99 SPO 1997 10 14 10 35 67 4.1 -9 678.60 -57.6 -53.2 -55.5 65 -99 SPO 1997 10 14 10 36 70 4.2 -9 678.60 -57.5 -53.2 -55.4 64 -99 SPO 1997 10 14 10 37 70 4.0 -9 678.60 -57.5 -53.2 -55.4 64 -99 SPO 1997 10 14 10 38 72 4.1 -9 678.60 -57.5 -53.1 -55.2 64 -99 SPO 1997 10 14 10 39 71 4.2 -9 678.60 -57.6 -53.2 -55.2 65 -99 SPO 1997 10 14 10 40 70 4.0 -9 678.60 -57.6 -53.2 -55.2 65 -99 SPO 1997 10 14 10 41 70 4.0 -9 678.60 -57.6 -53.2 -55.4 65 -99 SPO 1997 10 14 10 42 68 4.1 -9 678.60 -57.6 -53.0 -55.3 65 -99 SPO 1997 10 14 10 43 70 3.8 -9 678.60 -57.6 -53.1 -55.3 65 -99 SPO 1997 10 14 10 44 72 3.8 -9 678.60 -57.5 -53.1 -55.2 64 -99 SPO 1997 10 14 10 45 73 3.9 -9 678.60 -57.6 -53.1 -55.2 65 -99 SPO 1997 10 14 10 46 72 4.0 -9 678.60 -57.6 -53.1 -55.2 65 -99 SPO 1997 10 14 10 47 72 4.0 -9 678.60 -57.7 -53.2 -55.4 67 -99 SPO 1997 10 14 10 48 71 3.9 -9 678.60 -57.8 -53.2 -55.5 67 -99 SPO 1997 10 14 10 49 73 4.0 -9 678.60 -57.8 -53.1 -55.6 67 -99 SPO 1997 10 14 10 50 72 3.9 -9 678.60 -57.8 -53.0 -55.6 66 -99 SPO 1997 10 14 10 51 71 3.9 -9 678.60 -57.8 -53.0 -55.6 65 -99 SPO 1997 10 14 10 52 69 3.9 -9 678.60 -57.8 -53.1 -55.6 65 -99 SPO 1997 10 14 10 53 69 3.9 -9 678.60 -57.8 -53.0 -55.5 66 -99 SPO 1997 10 14 10 54 70 4.0 -9 678.60 -57.8 -53.0 -55.5 67 -99 SPO 1997 10 14 10 55 71 4.1 -9 678.60 -57.8 -53.0 -55.6 67 -99 SPO 1997 10 14 10 56 72 4.2 -9 678.60 -57.8 -53.0 -55.6 67 -99 SPO 1997 10 14 10 57 71 4.1 -9 678.60 -57.7 -53.0 -55.6 67 -99 SPO 1997 10 14 10 58 72 4.1 -9 678.60 -57.7 -53.1 -55.6 67 -99 SPO 1997 10 14 10 59 72 4.0 -9 678.60 -57.8 -53.1 -55.7 67 -99 SPO 1997 10 14 11 00 71 4.0 -9 678.60 -57.9 -53.1 -55.7 67 0 SPO 1997 10 14 11 01 70 4.2 -9 678.50 -58.0 -53.0 -55.8 68 -99 SPO 1997 10 14 11 02 68 4.2 -9 678.50 -58.0 -53.0 -55.8 68 -99 SPO 1997 10 14 11 03 67 4.4 -9 678.50 -57.7 -52.9 -55.7 64 -99 SPO 1997 10 14 11 04 67 4.3 -9 678.50 -57.6 -52.9 -55.6 63 -99 SPO 1997 10 14 11 05 67 4.2 -9 678.50 -57.6 -53.0 -55.6 63 -99 SPO 1997 10 14 11 06 67 4.1 -9 678.50 -57.6 -52.9 -55.6 63 -99 SPO 1997 10 14 11 07 65 4.1 -9 678.50 -57.5 -52.9 -55.6 64 -99 SPO 1997 10 14 11 08 65 4.3 -9 678.50 -57.3 -52.9 -55.5 63 -99 SPO 1997 10 14 11 09 64 4.2 -9 678.50 -57.4 -52.8 -55.5 65 -99 SPO 1997 10 14 11 10 65 4.4 -9 678.50 -57.4 -52.8 -55.5 66 -99 SPO 1997 10 14 11 11 66 4.2 -9 678.50 -57.3 -52.8 -55.5 66 -99 SPO 1997 10 14 11 12 67 4.2 -9 678.50 -57.4 -52.8 -55.5 67 -99 SPO 1997 10 14 11 13 67 4.1 -9 678.50 -57.4 -52.8 -55.5 67 -99 SPO 1997 10 14 11 14 67 4.1 -9 678.50 -57.5 -52.8 -55.6 67 -99 SPO 1997 10 14 11 15 68 4.0 -9 678.50 -57.5 -52.8 -55.6 67 -99 SPO 1997 10 14 11 16 67 4.2 -9 678.50 -57.4 -52.7 -55.4 67 -99 SPO 1997 10 14 11 17 65 3.9 -9 678.50 -57.4 -52.7 -55.4 66 -99 SPO 1997 10 14 11 18 68 4.2 -9 678.50 -57.4 -52.5 -55.3 66 -99 SPO 1997 10 14 11 19 66 3.9 -9 678.50 -57.3 -52.5 -55.2 65 -99 SPO 1997 10 14 11 20 67 4.0 -9 678.50 -57.3 -52.5 -55.2 65 -99 SPO 1997 10 14 11 21 66 4.0 -9 678.50 -57.3 -52.7 -55.2 66 -99 SPO 1997 10 14 11 22 65 4.1 -9 678.50 -57.4 -52.7 -55.3 67 -99 SPO 1997 10 14 11 23 65 4.3 -9 678.50 -57.3 -52.6 -55.4 67 -99 SPO 1997 10 14 11 24 65 4.3 -9 678.50 -57.2 -52.6 -55.4 67 -99 SPO 1997 10 14 11 25 63 4.4 -9 678.50 -57.2 -52.6 -55.4 67 -99 SPO 1997 10 14 11 26 62 4.3 -9 678.50 -57.2 -52.6 -55.4 66 -99 SPO 1997 10 14 11 27 62 4.3 -9 678.50 -57.2 -52.5 -55.4 67 -99 SPO 1997 10 14 11 28 62 4.3 -9 678.50 -57.2 -52.6 -55.4 67 -99 SPO 1997 10 14 11 29 62 4.2 -9 678.50 -57.2 -52.6 -55.4 67 -99 SPO 1997 10 14 11 30 61 4.1 -9 678.50 -57.3 -52.6 -55.4 68 -99 SPO 1997 10 14 11 31 63 4.0 -9 678.50 -57.3 -52.6 -55.4 67 -99 SPO 1997 10 14 11 32 65 4.0 -9 678.50 -57.3 -52.8 -55.2 67 -99 SPO 1997 10 14 11 33 64 4.1 -9 678.50 -57.3 -52.8 -55.0 66 -99 SPO 1997 10 14 11 34 63 4.1 -9 678.50 -57.2 -52.7 -55.1 66 -99 SPO 1997 10 14 11 35 62 4.2 -9 678.50 -57.0 -52.6 -55.1 65 -99 SPO 1997 10 14 11 36 63 4.2 -9 678.50 -57.0 -52.6 -55.2 66 -99 SPO 1997 10 14 11 37 64 4.2 -9 678.50 -57.1 -52.6 -55.2 68 -99 SPO 1997 10 14 11 38 64 4.2 -9 678.50 -57.2 -52.6 -55.2 68 -99 SPO 1997 10 14 11 39 65 4.0 -9 678.50 -57.1 -52.6 -55.2 68 -99 SPO 1997 10 14 11 40 64 4.0 -9 678.50 -57.0 -52.6 -55.1 68 -99 SPO 1997 10 14 11 41 64 3.9 -9 678.50 -57.1 -52.7 -55.2 68 -99 SPO 1997 10 14 11 42 64 3.9 -9 678.50 -57.1 -52.8 -55.2 68 -99 SPO 1997 10 14 11 43 65 3.9 -9 678.50 -57.1 -52.8 -55.2 69 -99 SPO 1997 10 14 11 44 65 3.9 -9 678.50 -57.2 -52.7 -55.2 69 -99 SPO 1997 10 14 11 45 63 3.9 -9 678.50 -57.2 -52.8 -55.2 68 -99 SPO 1997 10 14 11 46 63 3.9 -9 678.50 -57.2 -52.8 -55.1 68 -99 SPO 1997 10 14 11 47 63 3.9 -9 678.50 -57.0 -52.9 -55.1 66 -99 SPO 1997 10 14 11 48 63 3.8 -9 678.50 -57.0 -52.8 -55.0 67 -99 SPO 1997 10 14 11 49 65 3.6 -9 678.50 -57.0 -52.8 -55.0 67 -99 SPO 1997 10 14 11 50 62 3.6 -9 678.50 -57.1 -52.8 -55.0 68 -99 SPO 1997 10 14 11 51 60 3.7 -9 678.50 -57.2 -52.7 -55.1 68 -99 SPO 1997 10 14 11 52 60 3.7 -9 678.50 -57.1 -52.7 -55.0 68 -99 SPO 1997 10 14 11 53 59 3.7 -9 678.50 -57.0 -52.8 -54.9 68 -99 SPO 1997 10 14 11 54 58 3.6 -9 678.50 -57.0 -52.8 -54.8 68 -99 SPO 1997 10 14 11 55 58 3.6 -9 678.50 -57.0 -52.8 -54.9 69 -99 SPO 1997 10 14 11 56 58 3.7 -9 678.50 -57.1 -52.7 -54.9 70 -99 SPO 1997 10 14 11 57 59 3.8 -9 678.50 -56.8 -52.6 -54.8 68 -99 SPO 1997 10 14 11 58 59 3.8 -9 678.50 -56.6 -52.6 -54.6 67 -99 SPO 1997 10 14 11 59 60 3.8 -9 678.50 -56.6 -52.6 -54.6 68 -99 SPO 1997 10 14 12 00 61 3.6 -9 678.50 -56.8 -52.6 -54.7 69 0 SPO 1997 10 14 12 01 64 3.6 -9 678.50 -57.1 -52.7 -54.8 71 -99 SPO 1997 10 14 12 02 67 3.6 -9 678.60 -57.2 -52.7 -55.0 71 -99 SPO 1997 10 14 12 03 68 3.5 -9 678.60 -57.2 -52.8 -55.1 71 -99 SPO 1997 10 14 12 04 69 3.4 -9 678.60 -57.4 -53.0 -55.2 72 -99 SPO 1997 10 14 12 05 67 3.4 -9 678.60 -57.3 -53.0 -55.2 69 -99 SPO 1997 10 14 12 06 66 3.5 -9 678.60 -57.4 -53.0 -55.3 70 -99 SPO 1997 10 14 12 07 66 3.6 -9 678.60 -57.4 -53.0 -55.4 69 -99 SPO 1997 10 14 12 08 65 3.8 -9 678.60 -57.3 -52.9 -55.4 68 -99 SPO 1997 10 14 12 09 66 3.9 -9 678.60 -57.3 -53.0 -55.5 68 -99 SPO 1997 10 14 12 10 66 3.8 -9 678.60 -57.4 -53.1 -55.6 68 -99 SPO 1997 10 14 12 11 67 3.8 -9 678.60 -57.5 -53.2 -55.6 69 -99 SPO 1997 10 14 12 12 67 3.9 -9 678.60 -57.5 -53.2 -55.7 69 -99 SPO 1997 10 14 12 13 69 3.9 -9 678.60 -57.5 -53.2 -55.8 69 -99 SPO 1997 10 14 12 14 70 3.8 -9 678.60 -57.6 -53.4 -55.8 69 -99 SPO 1997 10 14 12 15 70 3.8 -9 678.60 -57.7 -53.4 -55.9 69 -99 SPO 1997 10 14 12 16 70 3.8 -9 678.60 -57.8 -53.4 -55.9 68 -99 SPO 1997 10 14 12 17 71 4.0 -9 678.60 -57.8 -53.4 -56.0 68 -99 SPO 1997 10 14 12 18 69 4.1 -9 678.60 -57.8 -53.3 -56.0 68 -99 SPO 1997 10 14 12 19 67 4.1 -9 678.60 -57.8 -53.3 -56.1 69 -99 SPO 1997 10 14 12 20 68 4.0 -9 678.60 -57.8 -53.3 -56.2 69 -99 SPO 1997 10 14 12 21 69 4.1 -9 678.60 -57.8 -53.4 -56.2 69 -99 SPO 1997 10 14 12 22 70 4.1 -9 678.60 -57.8 -53.4 -56.3 69 -99 SPO 1997 10 14 12 23 72 3.9 -9 678.60 -57.8 -53.4 -56.3 69 -99 SPO 1997 10 14 12 24 73 3.9 -9 678.60 -57.9 -53.4 -56.3 69 -99 SPO 1997 10 14 12 25 73 3.9 -9 678.60 -57.8 -53.5 -56.3 67 -99 SPO 1997 10 14 12 26 73 3.9 -9 678.60 -57.9 -53.6 -56.4 68 -99 SPO 1997 10 14 12 27 74 3.9 -9 678.60 -57.8 -53.6 -56.4 67 -99 SPO 1997 10 14 12 28 76 3.9 -9 678.60 -57.9 -53.7 -56.4 67 -99 SPO 1997 10 14 12 29 76 3.9 -9 678.60 -58.0 -53.8 -56.3 67 -99 SPO 1997 10 14 12 30 77 3.8 -9 678.60 -58.0 -53.8 -56.3 66 -99 SPO 1997 10 14 12 31 78 3.8 -9 678.60 -58.0 -53.8 -56.3 66 -99 SPO 1997 10 14 12 32 77 3.8 -9 678.60 -58.1 -53.8 -56.4 67 -99 SPO 1997 10 14 12 33 79 3.8 -9 678.60 -58.1 -53.7 -56.4 67 -99 SPO 1997 10 14 12 34 80 3.8 -9 678.60 -58.2 -53.8 -56.4 69 -99 SPO 1997 10 14 12 35 79 3.8 -9 678.60 -58.2 -53.8 -56.4 69 -99 SPO 1997 10 14 12 36 79 3.9 -9 678.60 -58.2 -53.8 -56.5 68 -99 SPO 1997 10 14 12 37 79 4.0 -9 678.60 -58.2 -53.8 -56.5 69 -99 SPO 1997 10 14 12 38 77 4.1 -9 678.60 -58.1 -53.7 -56.4 68 -99 SPO 1997 10 14 12 39 78 4.1 -9 678.70 -58.1 -53.7 -56.4 68 -99 SPO 1997 10 14 12 40 76 4.2 -9 678.60 -58.2 -53.7 -56.5 69 -99 SPO 1997 10 14 12 41 74 4.4 -9 678.60 -58.2 -53.6 -56.6 68 -99 SPO 1997 10 14 12 42 74 4.4 -9 678.60 -58.1 -53.6 -56.6 66 -99 SPO 1997 10 14 12 43 74 4.4 -9 678.70 -58.0 -53.6 -56.6 66 -99 SPO 1997 10 14 12 44 75 4.5 -9 678.70 -57.9 -53.5 -56.6 65 -99 SPO 1997 10 14 12 45 76 4.4 -9 678.70 -57.8 -53.6 -56.5 65 -99 SPO 1997 10 14 12 46 77 4.3 -9 678.70 -57.8 -53.6 -56.5 66 -99 SPO 1997 10 14 12 47 79 4.2 -9 678.70 -57.7 -53.7 -56.4 66 -99 SPO 1997 10 14 12 48 79 4.3 -9 678.70 -57.8 -53.7 -56.4 67 -99 SPO 1997 10 14 12 49 77 4.3 -9 678.70 -57.8 -53.8 -56.4 67 -99 SPO 1997 10 14 12 50 75 4.5 -9 678.70 -57.8 -53.6 -56.4 67 -99 SPO 1997 10 14 12 51 75 4.5 -9 678.70 -57.6 -53.5 -56.4 66 -99 SPO 1997 10 14 12 52 74 4.5 -9 678.70 -57.5 -53.5 -56.4 66 -99 SPO 1997 10 14 12 53 73 4.3 -9 678.70 -57.6 -53.6 -56.4 67 -99 SPO 1997 10 14 12 54 73 4.3 -9 678.70 -57.6 -53.6 -56.5 67 -99 SPO 1997 10 14 12 55 73 4.4 -9 678.70 -57.7 -53.6 -56.5 67 -99 SPO 1997 10 14 12 56 73 4.5 -9 678.70 -57.6 -53.5 -56.4 67 -99 SPO 1997 10 14 12 57 72 4.3 -9 678.70 -57.7 -53.6 -56.4 67 -99 SPO 1997 10 14 12 58 74 4.2 -9 678.70 -57.7 -53.6 -56.4 67 -99 SPO 1997 10 14 12 59 74 4.1 -9 678.70 -57.8 -53.8 -56.4 68 -99 SPO 1997 10 14 13 00 75 4.1 -9 678.70 -57.7 -53.8 -56.4 68 0 SPO 1997 10 14 13 01 74 4.1 -9 678.70 -57.7 -53.8 -56.4 68 -99 SPO 1997 10 14 13 02 73 4.1 -9 678.70 -57.7 -53.7 -56.4 68 -99 SPO 1997 10 14 13 03 72 4.2 -9 678.70 -57.7 -53.7 -56.5 67 -99 SPO 1997 10 14 13 04 71 4.2 -9 678.70 -57.7 -53.6 -56.5 67 -99 SPO 1997 10 14 13 05 69 4.2 -9 678.70 -57.8 -53.6 -56.6 69 -99 SPO 1997 10 14 13 06 68 4.2 -9 678.70 -57.8 -53.6 -56.6 68 -99 SPO 1997 10 14 13 07 66 4.2 -9 678.70 -57.9 -53.6 -56.6 69 -99 SPO 1997 10 14 13 08 66 4.2 -9 678.70 -57.9 -53.5 -56.7 68 -99 SPO 1997 10 14 13 09 67 4.3 -9 678.70 -57.9 -53.5 -56.6 67 -99 SPO 1997 10 14 13 10 66 4.3 -9 678.70 -57.9 -53.5 -56.6 67 -99 SPO 1997 10 14 13 11 66 4.1 -9 678.70 -57.8 -53.5 -56.6 66 -99 SPO 1997 10 14 13 12 66 4.0 -9 678.70 -57.9 -53.7 -56.6 67 -99 SPO 1997 10 14 13 13 65 4.2 -9 678.70 -57.8 -53.6 -56.6 66 -99 SPO 1997 10 14 13 14 64 4.3 -9 678.70 -57.9 -53.7 -56.6 67 -99 SPO 1997 10 14 13 15 63 4.4 -9 678.70 -58.0 -53.7 -56.6 67 -99 SPO 1997 10 14 13 16 63 4.3 -9 678.70 -58.0 -53.7 -56.6 67 -99 SPO 1997 10 14 13 17 63 4.3 -9 678.70 -58.1 -53.7 -56.6 67 -99 SPO 1997 10 14 13 18 63 4.5 -9 678.70 -58.2 -53.6 -56.7 67 -99 SPO 1997 10 14 13 19 65 4.5 -9 678.70 -58.2 -53.7 -56.8 66 -99 SPO 1997 10 14 13 20 65 4.6 -9 678.70 -58.2 -53.8 -56.8 66 -99 SPO 1997 10 14 13 21 66 4.7 -9 678.70 -58.2 -53.8 -56.8 65 -99 SPO 1997 10 14 13 22 67 4.6 -9 678.70 -58.2 -53.8 -56.9 64 -99 SPO 1997 10 14 13 23 68 4.6 -9 678.80 -58.2 -53.7 -56.9 63 -99 SPO 1997 10 14 13 24 68 4.6 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 25 68 4.5 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 26 69 4.6 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 27 69 4.6 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 28 69 4.5 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 29 70 4.4 -9 678.80 -58.2 -53.6 -56.9 63 -99 SPO 1997 10 14 13 30 68 4.3 -9 678.80 -58.3 -53.7 -56.9 63 -99 SPO 1997 10 14 13 31 68 4.4 -9 678.80 -58.3 -53.7 -56.9 63 -99 SPO 1997 10 14 13 32 67 4.4 -9 678.80 -58.2 -53.7 -56.9 63 -99 SPO 1997 10 14 13 33 65 4.5 -9 678.80 -58.3 -53.6 -56.9 65 -99 SPO 1997 10 14 13 34 65 4.5 -9 678.80 -58.3 -53.6 -56.9 65 -99 SPO 1997 10 14 13 35 67 4.4 -9 678.80 -58.3 -53.6 -56.9 65 -99 SPO 1997 10 14 13 36 69 4.3 -9 678.80 -58.3 -53.5 -56.9 64 -99 SPO 1997 10 14 13 37 68 4.1 -9 678.80 -58.4 -53.5 -56.9 64 -99 SPO 1997 10 14 13 38 70 4.2 -9 678.80 -58.4 -53.6 -56.9 64 -99 SPO 1997 10 14 13 39 69 4.3 -9 678.80 -58.4 -53.7 -56.9 65 -99 SPO 1997 10 14 13 40 67 4.2 -9 678.80 -58.4 -53.7 -56.9 66 -99 SPO 1997 10 14 13 41 67 4.2 -9 678.80 -58.4 -53.6 -56.9 66 -99 SPO 1997 10 14 13 42 66 4.4 -9 678.80 -58.4 -53.6 -56.9 66 -99 SPO 1997 10 14 13 43 66 4.4 -9 678.80 -58.4 -53.4 -56.9 66 -99 SPO 1997 10 14 13 44 65 4.3 -9 678.80 -58.4 -53.4 -56.8 66 -99 SPO 1997 10 14 13 45 65 4.3 -9 678.80 -58.4 -53.4 -56.8 68 -99 SPO 1997 10 14 13 46 65 4.4 -9 678.80 -58.4 -53.4 -56.8 68 -99 SPO 1997 10 14 13 47 65 4.5 -9 678.80 -58.3 -53.2 -56.7 67 -99 SPO 1997 10 14 13 48 65 4.3 -9 678.80 -58.3 -53.3 -56.7 66 -99 SPO 1997 10 14 13 49 65 4.4 -9 678.80 -58.3 -53.3 -56.7 66 -99 SPO 1997 10 14 13 50 65 4.4 -9 678.80 -58.3 -53.4 -56.7 65 -99 SPO 1997 10 14 13 51 66 4.3 -9 678.80 -58.3 -53.4 -56.7 65 -99 SPO 1997 10 14 13 52 66 4.3 -9 678.80 -58.4 -53.4 -56.6 66 -99 SPO 1997 10 14 13 53 65 4.2 -9 678.80 -58.4 -53.4 -56.6 66 -99 SPO 1997 10 14 13 54 64 4.2 -9 678.80 -58.4 -53.4 -56.6 66 -99 SPO 1997 10 14 13 55 64 4.2 -9 678.80 -58.3 -53.4 -56.5 64 -99 SPO 1997 10 14 13 56 64 4.0 -9 678.80 -58.3 -53.5 -56.4 64 -99 SPO 1997 10 14 13 57 65 3.8 -9 678.80 -58.3 -53.6 -56.4 64 -99 SPO 1997 10 14 13 58 67 3.8 -9 678.80 -58.3 -53.7 -56.3 65 -99 SPO 1997 10 14 13 59 68 3.7 -9 678.80 -58.3 -53.6 -56.1 64 -99 SPO 1997 10 14 14 00 69 3.6 -9 678.80 -58.4 -53.8 -56.0 65 0 SPO 1997 10 14 14 01 70 3.7 -9 678.80 -58.4 -53.8 -55.9 65 -99 SPO 1997 10 14 14 02 68 3.9 -9 678.80 -58.4 -53.8 -55.9 64 -99 SPO 1997 10 14 14 03 68 3.9 -9 678.80 -58.5 -53.9 -56.0 65 -99 SPO 1997 10 14 14 04 66 3.9 -9 678.80 -58.6 -54.0 -56.2 65 -99 SPO 1997 10 14 14 05 65 4.0 -9 678.80 -58.7 -54.0 -56.3 65 -99 SPO 1997 10 14 14 06 66 4.0 -9 678.80 -58.8 -54.0 -56.4 65 -99 SPO 1997 10 14 14 07 67 4.0 -9 678.80 -58.7 -54.1 -56.5 65 -99 SPO 1997 10 14 14 08 67 3.9 -9 678.80 -58.7 -54.1 -56.5 65 -99 SPO 1997 10 14 14 09 66 4.0 -9 678.80 -58.8 -54.2 -56.5 65 -99 SPO 1997 10 14 14 10 65 4.1 -9 678.80 -58.8 -54.2 -56.5 64 -99 SPO 1997 10 14 14 11 66 4.2 -9 678.80 -58.7 -54.2 -56.5 63 -99 SPO 1997 10 14 14 12 66 4.2 -9 678.80 -58.6 -54.2 -56.5 62 -99 SPO 1997 10 14 14 13 66 4.2 -9 678.80 -58.7 -54.2 -56.5 63 -99 SPO 1997 10 14 14 14 65 4.2 -9 678.70 -58.7 -54.1 -56.5 62 -99 SPO 1997 10 14 14 15 65 4.2 -9 678.70 -58.7 -54.2 -56.5 62 -99 SPO 1997 10 14 14 16 64 4.2 -9 678.70 -58.5 -54.0 -56.5 61 -99 SPO 1997 10 14 14 17 63 4.2 -9 678.70 -58.6 -54.0 -56.5 62 -99 SPO 1997 10 14 14 18 64 4.3 -9 678.70 -58.5 -53.8 -56.5 60 -99 SPO 1997 10 14 14 19 64 4.2 -9 678.70 -58.5 -53.8 -56.5 60 -99 SPO 1997 10 14 14 20 63 4.2 -9 678.80 -58.5 -53.9 -56.5 61 -99 SPO 1997 10 14 14 21 64 4.2 -9 678.80 -58.4 -53.7 -56.5 60 -99 SPO 1997 10 14 14 22 65 4.2 -9 678.80 -58.4 -53.7 -56.5 60 -99 SPO 1997 10 14 14 23 64 4.1 -9 678.80 -58.5 -53.8 -56.6 62 -99 SPO 1997 10 14 14 24 63 4.1 -9 678.80 -58.4 -53.8 -56.5 62 -99 SPO 1997 10 14 14 25 63 4.2 -9 678.80 -58.4 -53.6 -56.5 62 -99 SPO 1997 10 14 14 26 59 4.2 -9 678.80 -58.4 -53.7 -56.5 62 -99 SPO 1997 10 14 14 27 58 4.2 -9 678.80 -58.5 -53.8 -56.5 63 -99 SPO 1997 10 14 14 28 57 4.1 -9 678.80 -58.4 -53.8 -56.5 62 -99 SPO 1997 10 14 14 29 57 4.2 -9 678.80 -58.4 -53.7 -56.5 62 -99 SPO 1997 10 14 14 30 57 4.2 -9 678.80 -58.4 -53.4 -56.5 62 -99 SPO 1997 10 14 14 31 58 4.1 -9 678.80 -58.4 -53.4 -56.5 62 -99 SPO 1997 10 14 14 32 59 4.1 -9 678.80 -58.4 -53.5 -56.5 62 -99 SPO 1997 10 14 14 33 59 4.1 -9 678.90 -58.4 -53.4 -56.5 62 -99 SPO 1997 10 14 14 34 58 4.1 -9 678.90 -58.4 -53.4 -56.5 62 -99 SPO 1997 10 14 14 35 58 4.2 -9 678.90 -58.4 -53.5 -56.5 62 -99 SPO 1997 10 14 14 36 58 4.2 -9 678.90 -58.4 -53.5 -56.6 62 -99 SPO 1997 10 14 14 37 61 4.0 -9 678.90 -58.4 -53.5 -56.6 62 -99 SPO 1997 10 14 14 38 58 4.1 -9 678.90 -58.3 -53.6 -56.6 62 -99 SPO 1997 10 14 14 39 59 4.1 -9 678.90 -58.3 -53.5 -56.5 61 -99 SPO 1997 10 14 14 40 57 4.2 -9 678.90 -58.3 -53.3 -56.5 61 -99 SPO 1997 10 14 14 41 59 4.2 -9 678.80 -58.3 -53.3 -56.5 62 -99 SPO 1997 10 14 14 42 59 4.2 -9 678.80 -58.3 -53.4 -56.6 62 -99 SPO 1997 10 14 14 43 60 4.2 -9 678.80 -58.3 -53.3 -56.6 62 -99 SPO 1997 10 14 14 44 59 4.4 -9 678.80 -58.4 -53.2 -56.6 62 -99 SPO 1997 10 14 14 45 59 4.3 -9 678.80 -58.3 -53.0 -56.6 61 -99 SPO 1997 10 14 14 46 58 4.5 -9 678.80 -58.2 -53.2 -56.6 59 -99 SPO 1997 10 14 14 47 58 4.4 -9 678.80 -58.1 -53.2 -56.5 58 -99 SPO 1997 10 14 14 48 59 4.3 -9 678.90 -57.8 -53.3 -56.4 57 -99 SPO 1997 10 14 14 49 57 4.4 -9 678.90 -57.8 -53.2 -56.3 59 -99 SPO 1997 10 14 14 50 56 4.3 -9 678.90 -57.9 -53.3 -56.4 60 -99 SPO 1997 10 14 14 51 61 4.1 -9 678.80 -57.8 -53.3 -56.3 60 -99 SPO 1997 10 14 14 52 61 4.0 -9 678.80 -57.9 -53.3 -56.3 62 -99 SPO 1997 10 14 14 53 59 4.2 -9 678.80 -58.0 -53.4 -56.4 62 -99 SPO 1997 10 14 14 54 58 4.1 -9 678.80 -58.0 -53.5 -56.4 62 -99 SPO 1997 10 14 14 55 58 4.4 -9 678.80 -57.8 -53.5 -56.3 61 -99 SPO 1997 10 14 14 56 57 4.3 -9 678.80 -57.7 -53.4 -56.2 61 -99 SPO 1997 10 14 14 57 57 4.4 -9 678.80 -57.8 -53.3 -56.3 63 -99 SPO 1997 10 14 14 58 58 4.6 -9 678.80 -57.8 -53.2 -56.4 63 -99 SPO 1997 10 14 14 59 60 4.6 -9 678.80 -57.9 -53.0 -56.4 62 -99 SPO 1997 10 14 15 00 61 4.7 -9 678.80 -57.8 -53.0 -56.4 62 0 SPO 1997 10 14 15 01 59 5.0 -9 678.80 -57.8 -52.9 -56.4 62 -99 SPO 1997 10 14 15 02 58 5.1 -9 678.80 -57.8 -52.8 -56.5 64 -99 SPO 1997 10 14 15 03 60 4.9 -9 678.80 -57.8 -52.8 -56.5 65 -99 SPO 1997 10 14 15 04 61 4.8 -9 678.80 -57.7 -53.0 -56.4 64 -99 SPO 1997 10 14 15 05 62 4.8 -9 678.80 -57.7 -53.0 -56.4 65 -99 SPO 1997 10 14 15 06 62 4.8 -9 678.80 -57.7 -53.0 -56.4 64 -99 SPO 1997 10 14 15 07 61 4.8 -9 678.80 -57.8 -53.0 -56.4 64 -99 SPO 1997 10 14 15 08 62 4.8 -9 678.80 -57.7 -53.0 -56.4 63 -99 SPO 1997 10 14 15 09 62 4.8 -9 678.90 -57.7 -53.0 -56.4 64 -99 SPO 1997 10 14 15 10 64 4.8 -9 678.90 -57.7 -53.0 -56.4 64 -99 SPO 1997 10 14 15 11 66 4.9 -9 678.90 -57.8 -52.8 -56.4 65 -99 SPO 1997 10 14 15 12 67 4.9 -9 678.80 -57.8 -52.9 -56.5 64 -99 SPO 1997 10 14 15 13 66 5.0 -9 678.90 -58.0 -52.9 -56.6 65 -99 SPO 1997 10 14 15 14 64 5.0 -9 678.80 -58.1 -52.9 -56.6 66 -99 SPO 1997 10 14 15 15 62 5.0 -9 678.80 -57.9 -52.8 -56.5 64 -99 SPO 1997 10 14 15 16 63 4.9 -9 678.80 -57.8 -52.8 -56.5 63 -99 SPO 1997 10 14 15 17 64 5.0 -9 678.80 -57.7 -52.9 -56.4 63 -99 SPO 1997 10 14 15 18 64 5.0 -9 678.80 -57.6 -52.6 -56.4 63 -99 SPO 1997 10 14 15 19 65 4.9 -9 678.80 -57.7 -52.7 -56.4 64 -99 SPO 1997 10 14 15 20 66 4.8 -9 678.80 -57.8 -53.0 -56.5 64 -99 SPO 1997 10 14 15 21 67 4.8 -9 678.80 -57.9 -53.0 -56.6 65 -99 SPO 1997 10 14 15 22 65 4.7 -9 678.80 -58.0 -52.9 -56.6 65 -99 SPO 1997 10 14 15 23 63 4.7 -9 678.80 -58.1 -52.9 -56.6 63 -99 SPO 1997 10 14 15 24 64 4.6 -9 678.80 -58.1 -53.0 -56.6 62 -99 SPO 1997 10 14 15 25 63 4.6 -9 678.80 -58.2 -53.1 -56.6 62 -99 SPO 1997 10 14 15 26 66 4.4 -9 678.80 -58.2 -53.2 -56.6 62 -99 SPO 1997 10 14 15 27 65 4.1 -9 678.80 -58.3 -53.6 -56.6 63 -99 SPO 1997 10 14 15 28 67 4.6 -9 678.80 -58.2 -53.4 -56.6 62 -99 SPO 1997 10 14 15 29 69 4.7 -9 678.80 -58.1 -52.7 -56.5 62 -99 SPO 1997 10 14 15 30 70 4.5 -9 678.80 -58.3 -53.2 -56.6 63 -99 SPO 1997 10 14 15 31 69 4.4 -9 678.80 -58.4 -53.6 -56.7 64 -99 SPO 1997 10 14 15 32 71 4.4 -9 678.80 -58.5 -53.8 -56.7 64 -99 SPO 1997 10 14 15 33 71 4.7 -9 678.80 -58.4 -53.2 -56.7 62 -99 SPO 1997 10 14 15 34 70 4.6 -9 678.80 -58.3 -53.2 -56.6 62 -99 SPO 1997 10 14 15 35 69 4.4 -9 678.80 -58.4 -53.6 -56.7 62 -99 SPO 1997 10 14 15 36 67 4.4 -9 678.80 -58.4 -53.6 -56.7 62 -99 SPO 1997 10 14 15 37 66 4.4 -9 678.80 -58.4 -53.5 -56.7 62 -99 SPO 1997 10 14 15 38 65 4.4 -9 678.80 -58.4 -53.6 -56.7 61 -99 SPO 1997 10 14 15 39 65 4.5 -9 678.80 -58.2 -53.4 -56.6 59 -99 SPO 1997 10 14 15 40 63 4.7 -9 678.80 -58.1 -53.2 -56.6 58 -99 SPO 1997 10 14 15 41 64 4.4 -9 678.80 -58.0 -53.3 -56.5 58 -99 SPO 1997 10 14 15 42 62 5.0 -9 678.80 -58.0 -52.9 -56.5 59 -99 SPO 1997 10 14 15 43 62 5.0 -9 678.80 -57.8 -52.7 -56.4 59 -99 SPO 1997 10 14 15 44 61 5.0 -9 678.80 -57.7 -52.7 -56.4 59 -99 SPO 1997 10 14 15 45 63 4.8 -9 678.80 -57.6 -52.7 -56.3 59 -99 SPO 1997 10 14 15 46 63 4.0 -9 678.80 -57.7 -53.4 -56.4 63 -99 SPO 1997 10 14 15 47 62 4.7 -9 678.80 -57.8 -53.4 -56.4 63 -99 SPO 1997 10 14 15 48 64 4.5 -9 678.80 -57.8 -53.4 -56.3 63 -99 SPO 1997 10 14 15 49 64 4.9 -9 678.80 -57.6 -52.8 -56.3 62 -99 SPO 1997 10 14 15 50 63 4.8 -9 678.80 -57.6 -53.0 -56.4 62 -99 SPO 1997 10 14 15 51 63 4.5 -9 678.80 -57.9 -53.0 -56.4 64 -99 SPO 1997 10 14 15 52 63 4.7 -9 678.80 -58.0 -52.8 -56.5 65 -99 SPO 1997 10 14 15 53 63 4.8 -9 678.80 -58.0 -52.7 -56.5 63 -99 SPO 1997 10 14 15 54 64 4.4 -9 678.80 -58.0 -53.0 -56.6 65 -99 SPO 1997 10 14 15 55 59 4.5 -9 678.80 -58.1 -53.4 -56.6 64 -99 SPO 1997 10 14 15 56 61 4.5 -9 678.80 -57.9 -53.5 -56.5 62 -99 SPO 1997 10 14 15 57 61 4.6 -9 678.80 -57.9 -53.4 -56.5 62 -99 SPO 1997 10 14 15 58 63 4.6 -9 678.80 -57.8 -53.3 -56.4 63 -99 SPO 1997 10 14 15 59 65 5.0 -9 678.80 -57.9 -53.1 -56.4 64 -99 SPO 1997 10 14 16 00 67 4.5 -9 678.80 -57.9 -53.3 -56.4 62 0 SPO 1997 10 14 16 01 70 4.7 -9 678.80 -58.0 -53.0 -56.5 62 -99 SPO 1997 10 14 16 02 67 3.9 -9 678.80 -58.3 -53.6 -56.5 63 -99 SPO 1997 10 14 16 03 65 4.2 -9 678.80 -58.4 -54.0 -56.6 64 -99 SPO 1997 10 14 16 04 64 4.3 -9 678.80 -58.2 -53.6 -56.5 62 -99 SPO 1997 10 14 16 05 64 4.0 -9 678.80 -58.2 -53.6 -56.5 61 -99 SPO 1997 10 14 16 06 64 4.7 -9 678.80 -58.1 -53.2 -56.5 60 -99 SPO 1997 10 14 16 07 62 4.8 -9 678.80 -58.1 -53.2 -56.6 62 -99 SPO 1997 10 14 16 08 63 4.6 -9 678.80 -58.1 -53.4 -56.6 62 -99 SPO 1997 10 14 16 09 64 4.7 -9 678.80 -58.2 -53.3 -56.6 63 -99 SPO 1997 10 14 16 10 60 4.8 -9 678.80 -58.2 -53.1 -56.6 63 -99 SPO 1997 10 14 16 11 59 4.6 -9 678.80 -58.0 -53.2 -56.5 62 -99 SPO 1997 10 14 16 12 59 4.4 -9 678.80 -57.9 -53.2 -56.5 61 -99 SPO 1997 10 14 16 13 62 4.4 -9 678.80 -57.9 -53.2 -56.4 61 -99 SPO 1997 10 14 16 14 63 4.3 -9 678.80 -58.0 -53.2 -56.4 62 -99 SPO 1997 10 14 16 15 64 4.5 -9 678.80 -58.0 -53.0 -56.4 62 -99 SPO 1997 10 14 16 16 63 4.4 -9 678.80 -58.0 -53.1 -56.4 61 -99 SPO 1997 10 14 16 17 64 4.1 -9 678.80 -58.0 -53.2 -56.5 61 -99 SPO 1997 10 14 16 18 62 4.2 -9 678.80 -58.0 -53.3 -56.5 61 -99 SPO 1997 10 14 16 19 60 4.4 -9 678.80 -57.9 -53.2 -56.4 60 -99 SPO 1997 10 14 16 20 61 4.4 -9 678.80 -57.9 -53.3 -56.4 60 -99 SPO 1997 10 14 16 21 63 4.3 -9 678.80 -57.9 -53.2 -56.4 61 -99 SPO 1997 10 14 16 22 65 4.3 -9 678.70 -57.9 -53.2 -56.4 62 -99 SPO 1997 10 14 16 23 64 4.5 -9 678.70 -58.0 -53.2 -56.5 63 -99 SPO 1997 10 14 16 24 64 4.6 -9 678.70 -58.0 -53.1 -56.5 63 -99 SPO 1997 10 14 16 25 67 4.5 -9 678.70 -58.1 -53.1 -56.6 64 -99 SPO 1997 10 14 16 26 67 4.5 -9 678.70 -58.2 -53.2 -56.6 64 -99 SPO 1997 10 14 16 27 65 4.6 -9 678.70 -58.2 -53.2 -56.6 63 -99 SPO 1997 10 14 16 28 68 4.7 -9 678.70 -58.1 -53.2 -56.6 62 -99 SPO 1997 10 14 16 29 67 4.7 -9 678.80 -58.1 -53.2 -56.6 62 -99 SPO 1997 10 14 16 30 68 4.7 -9 678.80 -58.1 -52.8 -56.6 62 -99 SPO 1997 10 14 16 31 68 4.5 -9 678.80 -58.2 -53.2 -56.6 63 -99 SPO 1997 10 14 16 32 67 4.8 -9 678.70 -58.2 -53.1 -56.6 63 -99 SPO 1997 10 14 16 33 68 4.8 -9 678.70 -58.2 -53.1 -56.7 64 -99 SPO 1997 10 14 16 34 67 4.7 -9 678.80 -58.3 -53.2 -56.8 65 -99 SPO 1997 10 14 16 35 68 4.4 -9 678.80 -58.2 -53.5 -56.7 64 -99 SPO 1997 10 14 16 36 69 4.5 -9 678.80 -58.3 -53.8 -56.7 64 -99 SPO 1997 10 14 16 37 71 4.7 -9 678.80 -58.2 -53.7 -56.7 62 -99 SPO 1997 10 14 16 38 71 4.7 -9 678.80 -58.2 -53.6 -56.7 62 -99 SPO 1997 10 14 16 39 69 4.7 -9 678.80 -58.3 -53.8 -56.7 63 -99 SPO 1997 10 14 16 40 68 4.8 -9 678.80 -58.2 -53.6 -56.7 62 -99 SPO 1997 10 14 16 41 68 4.8 -9 678.80 -58.3 -53.4 -56.7 62 -99 SPO 1997 10 14 16 42 66 4.7 -9 678.80 -58.3 -53.4 -56.7 62 -99 SPO 1997 10 14 16 43 64 4.7 -9 678.80 -58.3 -53.1 -56.7 62 -99 SPO 1997 10 14 16 44 63 4.7 -9 678.80 -58.3 -52.9 -56.7 62 -99 SPO 1997 10 14 16 45 62 4.7 -9 678.80 -58.3 -52.8 -56.7 63 -99 SPO 1997 10 14 16 46 61 4.7 -9 678.80 -58.2 -52.8 -56.6 62 -99 SPO 1997 10 14 16 47 60 4.7 -9 678.80 -58.1 -52.6 -56.6 62 -99 SPO 1997 10 14 16 48 61 4.6 -9 678.80 -58.1 -52.7 -56.6 63 -99 SPO 1997 10 14 16 49 62 4.8 -9 678.80 -58.1 -52.7 -56.5 63 -99 SPO 1997 10 14 16 50 63 4.6 -9 678.80 -58.1 -52.8 -56.5 63 -99 SPO 1997 10 14 16 51 65 4.6 -9 678.80 -58.1 -52.9 -56.5 64 -99 SPO 1997 10 14 16 52 66 4.7 -9 678.80 -58.1 -52.8 -56.5 64 -99 SPO 1997 10 14 16 53 66 4.6 -9 678.80 -58.1 -52.9 -56.6 63 -99 SPO 1997 10 14 16 54 67 4.7 -9 678.80 -58.0 -52.7 -56.6 62 -99 SPO 1997 10 14 16 55 68 4.6 -9 678.80 -58.1 -52.8 -56.6 63 -99 SPO 1997 10 14 16 56 69 4.5 -9 678.80 -58.1 -53.1 -56.5 62 -99 SPO 1997 10 14 16 57 67 4.5 -9 678.80 -58.1 -53.1 -56.5 63 -99 SPO 1997 10 14 16 58 66 4.6 -9 678.80 -58.1 -53.0 -56.5 64 -99 SPO 1997 10 14 16 59 65 4.7 -9 678.70 -58.1 -52.8 -56.5 64 -99 SPO 1997 10 14 17 00 64 4.5 -9 678.70 -58.1 -52.8 -56.5 66 0 SPO 1997 10 14 17 01 64 4.2 -9 678.70 -58.1 -53.0 -56.5 66 -99 SPO 1997 10 14 17 02 66 4.3 -9 678.70 -58.2 -53.1 -56.5 66 -99 SPO 1997 10 14 17 03 65 4.5 -9 678.70 -58.2 -53.0 -56.5 65 -99 SPO 1997 10 14 17 04 65 4.5 -9 678.80 -58.2 -52.9 -56.6 66 -99 SPO 1997 10 14 17 05 66 4.4 -9 678.80 -58.2 -52.9 -56.5 65 -99 SPO 1997 10 14 17 06 65 4.5 -9 678.80 -58.2 -52.9 -56.5 64 -99 SPO 1997 10 14 17 07 63 4.5 -9 678.80 -58.2 -52.8 -56.5 64 -99 SPO 1997 10 14 17 08 63 4.6 -9 678.70 -58.2 -52.8 -56.5 64 -99 SPO 1997 10 14 17 09 64 4.7 -9 678.70 -58.2 -52.7 -56.5 64 -99 SPO 1997 10 14 17 10 65 4.7 -9 678.70 -58.2 -52.7 -56.6 64 -99 SPO 1997 10 14 17 11 65 4.7 -9 678.70 -58.2 -52.7 -56.6 64 -99 SPO 1997 10 14 17 12 65 4.7 -9 678.70 -58.2 -52.6 -56.6 64 -99 SPO 1997 10 14 17 13 64 4.8 -9 678.70 -58.2 -52.5 -56.6 65 -99 SPO 1997 10 14 17 14 64 4.8 -9 678.70 -58.1 -52.3 -56.6 63 -99 SPO 1997 10 14 17 15 66 4.8 -9 678.70 -58.1 -52.2 -56.6 63 -99 SPO 1997 10 14 17 16 68 4.8 -9 678.70 -58.2 -52.4 -56.6 62 -99 SPO 1997 10 14 17 17 70 4.6 -9 678.80 -58.2 -52.5 -56.6 63 -99 SPO 1997 10 14 17 18 70 4.6 -9 678.80 -58.2 -52.8 -56.6 62 -99 SPO 1997 10 14 17 19 70 4.7 -9 678.80 -58.2 -53.0 -56.6 62 -99 SPO 1997 10 14 17 20 72 4.7 -9 678.80 -58.2 -53.4 -56.7 61 -99 SPO 1997 10 14 17 21 73 4.7 -9 678.80 -58.3 -53.8 -56.7 61 -99 SPO 1997 10 14 17 22 74 4.7 -9 678.80 -58.3 -53.9 -56.6 62 -99 SPO 1997 10 14 17 23 73 4.8 -9 678.90 -58.4 -53.9 -56.7 62 -99 SPO 1997 10 14 17 24 74 4.8 -9 678.90 -58.4 -53.9 -56.7 62 -99 SPO 1997 10 14 17 25 73 4.8 -9 678.90 -58.4 -53.8 -56.7 63 -99 SPO 1997 10 14 17 26 72 4.9 -9 678.90 -58.4 -53.8 -56.8 64 -99 SPO 1997 10 14 17 27 72 4.9 -9 678.90 -58.4 -53.7 -56.8 65 -99 SPO 1997 10 14 17 28 71 4.9 -9 678.90 -58.4 -53.7 -56.8 65 -99 SPO 1997 10 14 17 29 71 4.8 -9 678.90 -58.3 -53.7 -56.8 64 -99 SPO 1997 10 14 17 30 71 4.7 -9 678.90 -58.3 -53.7 -56.7 64 -99 SPO 1997 10 14 17 31 70 4.6 -9 678.90 -58.3 -53.8 -56.8 64 -99 SPO 1997 10 14 17 32 70 4.5 -9 678.90 -58.4 -53.8 -56.8 64 -99 SPO 1997 10 14 17 33 70 4.4 -9 678.90 -58.4 -53.8 -56.8 64 -99 SPO 1997 10 14 17 34 72 4.5 -9 678.90 -58.4 -53.8 -56.7 63 -99 SPO 1997 10 14 17 35 73 4.4 -9 678.90 -58.4 -53.8 -56.7 64 -99 SPO 1997 10 14 17 36 72 4.4 -9 678.90 -58.4 -53.8 -56.6 64 -99 SPO 1997 10 14 17 37 71 4.4 -9 678.90 -58.5 -53.9 -56.7 66 -99 SPO 1997 10 14 17 38 71 4.5 -9 678.90 -58.5 -53.8 -56.8 66 -99 SPO 1997 10 14 17 39 70 4.5 -9 678.90 -58.5 -53.8 -56.9 66 -99 SPO 1997 10 14 17 40 71 4.4 -9 678.90 -58.6 -53.8 -56.9 66 -99 SPO 1997 10 14 17 41 71 4.4 -9 678.90 -58.6 -53.8 -56.9 66 -99 SPO 1997 10 14 17 42 71 4.4 -9 678.90 -58.6 -53.8 -56.9 67 -99 SPO 1997 10 14 17 43 71 4.3 -9 678.90 -58.6 -53.8 -56.9 66 -99 SPO 1997 10 14 17 44 69 4.3 -9 678.90 -58.6 -53.8 -56.9 66 -99 SPO 1997 10 14 17 45 68 4.4 -9 678.90 -58.6 -53.8 -56.9 66 -99 SPO 1997 10 14 17 46 69 4.4 -9 678.90 -58.6 -53.7 -56.9 64 -99 SPO 1997 10 14 17 47 70 4.5 -9 678.90 -58.6 -53.7 -56.9 63 -99 SPO 1997 10 14 17 48 70 4.4 -9 678.90 -58.6 -53.7 -56.9 63 -99 SPO 1997 10 14 17 49 70 4.3 -9 678.90 -58.6 -53.6 -56.9 63 -99 SPO 1997 10 14 17 50 70 4.3 -9 678.90 -58.7 -53.6 -56.9 65 -99 SPO 1997 10 14 17 51 70 4.3 -9 679.00 -58.7 -53.6 -56.8 64 -99 SPO 1997 10 14 17 52 69 4.5 -9 679.00 -58.7 -53.6 -56.8 64 -99 SPO 1997 10 14 17 53 69 4.5 -9 678.90 -58.7 -53.6 -56.9 65 -99 SPO 1997 10 14 17 54 69 4.6 -9 679.00 -58.7 -53.6 -56.9 64 -99 SPO 1997 10 14 17 55 69 4.6 -9 679.00 -58.6 -53.6 -56.9 62 -99 SPO 1997 10 14 17 56 69 4.6 -9 679.00 -58.6 -53.6 -57.0 62 -99 SPO 1997 10 14 17 57 69 4.5 -9 679.00 -58.6 -53.6 -57.0 62 -99 SPO 1997 10 14 17 58 68 4.6 -9 679.00 -58.6 -53.5 -57.0 62 -99 SPO 1997 10 14 17 59 68 4.6 -9 679.00 -58.6 -53.5 -57.0 62 -99 SPO 1997 10 14 18 00 68 4.6 -9 679.10 -58.6 -53.5 -57.0 62 0 SPO 1997 10 14 18 01 67 4.7 -9 679.00 -58.6 -53.5 -57.0 63 -99 SPO 1997 10 14 18 02 67 4.8 -9 679.00 -58.5 -53.4 -57.0 62 -99 SPO 1997 10 14 18 03 66 4.8 -9 679.00 -58.5 -53.4 -57.0 63 -99 SPO 1997 10 14 18 04 65 4.9 -9 679.00 -58.5 -53.4 -57.0 63 -99 SPO 1997 10 14 18 05 63 4.9 -9 679.00 -58.4 -53.4 -57.0 63 -99 SPO 1997 10 14 18 06 63 5.0 -9 679.00 -58.4 -53.4 -57.0 63 -99 SPO 1997 10 14 18 07 62 5.1 -9 679.00 -58.3 -53.2 -56.9 63 -99 SPO 1997 10 14 18 08 61 5.1 -9 679.00 -58.2 -53.0 -56.8 62 -99 SPO 1997 10 14 18 09 61 5.0 -9 679.10 -58.1 -52.8 -56.8 60 -99 SPO 1997 10 14 18 10 62 5.0 -9 679.10 -58.2 -52.8 -56.8 61 -99 SPO 1997 10 14 18 11 61 4.9 -9 679.10 -58.2 -52.8 -56.8 62 -99 SPO 1997 10 14 18 12 60 5.0 -9 679.10 -58.2 -52.8 -56.8 62 -99 SPO 1997 10 14 18 13 59 5.0 -9 679.10 -58.2 -52.8 -56.8 64 -99 SPO 1997 10 14 18 14 59 5.1 -9 679.10 -58.2 -52.8 -56.8 66 -99 SPO 1997 10 14 18 15 58 5.1 -9 679.10 -58.2 -52.4 -56.8 66 -99 SPO 1997 10 14 18 16 58 5.2 -9 679.10 -58.2 -52.2 -56.8 67 -99 SPO 1997 10 14 18 17 59 5.1 -9 679.10 -58.2 -52.1 -56.8 67 -99 SPO 1997 10 14 18 18 58 5.0 -9 679.10 -58.2 -52.0 -56.8 67 -99 SPO 1997 10 14 18 19 59 5.1 -9 679.10 -58.2 -52.1 -56.8 67 -99 SPO 1997 10 14 18 20 59 5.1 -9 679.10 -58.2 -52.0 -56.8 67 -99 SPO 1997 10 14 18 21 59 5.2 -9 679.10 -58.2 -51.8 -56.8 66 -99 SPO 1997 10 14 18 22 58 5.2 -9 679.10 -58.1 -51.6 -56.8 66 -99 SPO 1997 10 14 18 23 58 5.2 -9 679.10 -58.1 -51.6 -56.8 64 -99 SPO 1997 10 14 18 24 58 5.1 -9 679.10 -58.2 -51.6 -56.8 66 -99 SPO 1997 10 14 18 25 59 5.1 -9 679.10 -58.2 -51.8 -56.8 66 -99 SPO 1997 10 14 18 26 60 5.0 -9 679.10 -58.2 -51.8 -56.8 66 -99 SPO 1997 10 14 18 27 60 5.0 -9 679.10 -58.2 -51.8 -56.8 66 -99 SPO 1997 10 14 18 28 60 5.0 -9 679.10 -58.2 -52.0 -56.8 66 -99 SPO 1997 10 14 18 29 61 5.0 -9 679.10 -58.2 -52.3 -56.8 66 -99 SPO 1997 10 14 18 30 61 5.0 -9 679.20 -58.2 -52.5 -56.9 67 -99 SPO 1997 10 14 18 31 62 5.0 -9 679.10 -58.2 -52.7 -56.9 67 -99 SPO 1997 10 14 18 32 64 4.8 -9 679.20 -58.2 -52.6 -56.8 67 -99 SPO 1997 10 14 18 33 65 4.9 -9 679.10 -58.2 -52.6 -56.8 66 -99 SPO 1997 10 14 18 34 65 4.9 -9 679.10 -58.2 -52.8 -56.9 66 -99 SPO 1997 10 14 18 35 65 5.0 -9 679.10 -58.2 -52.6 -56.9 66 -99 SPO 1997 10 14 18 36 65 5.0 -9 679.20 -58.3 -52.6 -56.9 67 -99 SPO 1997 10 14 18 37 65 5.0 -9 679.10 -58.2 -52.7 -56.9 66 -99 SPO 1997 10 14 18 38 64 5.1 -9 679.10 -58.2 -52.8 -56.9 66 -99 SPO 1997 10 14 18 39 65 5.0 -9 679.10 -58.2 -52.8 -56.9 66 -99 SPO 1997 10 14 18 40 66 5.1 -9 679.10 -58.3 -53.0 -56.9 66 -99 SPO 1997 10 14 18 41 67 5.1 -9 679.10 -58.2 -53.3 -56.9 65 -99 SPO 1997 10 14 18 42 68 5.1 -9 679.10 -58.2 -53.2 -56.9 65 -99 SPO 1997 10 14 18 43 68 5.1 -9 679.10 -58.2 -53.4 -56.9 65 -99 SPO 1997 10 14 18 44 68 5.2 -9 679.10 -58.2 -53.1 -56.9 65 -99 SPO 1997 10 14 18 45 68 5.2 -9 679.10 -58.1 -52.9 -56.9 63 -99 SPO 1997 10 14 18 46 68 5.1 -9 679.10 -58.1 -53.0 -56.9 63 -99 SPO 1997 10 14 18 47 67 5.1 -9 679.10 -58.2 -53.0 -56.9 65 -99 SPO 1997 10 14 18 48 66 5.2 -9 679.10 -58.2 -53.1 -56.9 64 -99 SPO 1997 10 14 18 49 66 5.1 -9 679.10 -58.2 -53.2 -56.9 64 -99 SPO 1997 10 14 18 50 66 5.0 -9 679.10 -58.2 -53.4 -56.9 66 -99 SPO 1997 10 14 18 51 66 4.9 -9 679.10 -58.2 -53.6 -56.9 66 -99 SPO 1997 10 14 18 52 66 4.8 -9 679.10 -58.2 -53.6 -56.9 67 -99 SPO 1997 10 14 18 53 66 4.8 -9 679.10 -58.2 -53.7 -56.9 66 -99 SPO 1997 10 14 18 54 65 4.9 -9 679.10 -58.2 -53.7 -56.9 66 -99 SPO 1997 10 14 18 55 65 4.9 -9 679.10 -58.3 -53.8 -56.9 67 -99 SPO 1997 10 14 18 56 66 4.9 -9 679.10 -58.3 -53.8 -56.9 67 -99 SPO 1997 10 14 18 57 67 4.9 -9 679.10 -58.3 -53.8 -56.9 67 -99 SPO 1997 10 14 18 58 67 5.0 -9 679.10 -58.4 -53.9 -57.0 66 -99 SPO 1997 10 14 18 59 68 5.0 -9 679.10 -58.4 -53.9 -57.0 66 -99 SPO 1997 10 14 19 00 68 5.0 -9 679.20 -58.4 -53.9 -57.1 65 0 SPO 1997 10 14 19 01 68 5.1 -9 679.20 -58.4 -53.9 -57.1 65 -99 SPO 1997 10 14 19 02 68 5.2 -9 679.20 -58.4 -53.8 -57.1 65 -99 SPO 1997 10 14 19 03 68 5.2 -9 679.20 -58.4 -53.8 -57.1 65 -99 SPO 1997 10 14 19 04 68 5.2 -9 679.20 -58.5 -53.8 -57.1 65 -99 SPO 1997 10 14 19 05 68 5.1 -9 679.20 -58.5 -53.8 -57.1 66 -99 SPO 1997 10 14 19 06 68 5.1 -9 679.20 -58.6 -53.8 -57.1 66 -99 SPO 1997 10 14 19 07 68 5.1 -9 679.20 -58.6 -53.8 -57.1 65 -99 SPO 1997 10 14 19 08 68 5.0 -9 679.20 -58.6 -53.8 -57.1 65 -99 SPO 1997 10 14 19 09 68 4.9 -9 679.20 -58.6 -53.8 -57.1 64 -99 SPO 1997 10 14 19 10 68 4.9 -9 679.20 -58.6 -53.9 -57.1 64 -99 SPO 1997 10 14 19 11 69 4.9 -9 679.20 -58.6 -53.9 -57.2 64 -99 SPO 1997 10 14 19 12 69 4.9 -9 679.20 -58.6 -53.9 -57.2 63 -99 SPO 1997 10 14 19 13 69 4.9 -9 679.20 -58.6 -54.0 -57.2 63 -99 SPO 1997 10 14 19 14 69 4.7 -9 679.20 -58.7 -54.0 -57.2 64 -99 SPO 1997 10 14 19 15 70 4.6 -9 679.20 -58.7 -54.0 -57.1 64 -99 SPO 1997 10 14 19 16 70 4.5 -9 679.20 -58.7 -54.0 -57.1 64 -99 SPO 1997 10 14 19 17 69 4.4 -9 679.20 -58.7 -54.0 -57.1 64 -99 SPO 1997 10 14 19 18 69 4.2 -9 679.30 -58.8 -54.0 -57.1 65 -99 SPO 1997 10 14 19 19 69 4.1 -9 679.30 -58.8 -54.0 -57.1 65 -99 SPO 1997 10 14 19 20 69 4.0 -9 679.20 -58.9 -54.0 -57.1 65 -99 SPO 1997 10 14 19 21 68 3.9 -9 679.30 -58.9 -54.0 -57.0 65 -99 SPO 1997 10 14 19 22 69 3.8 -9 679.30 -59.0 -54.0 -56.9 65 -99 SPO 1997 10 14 19 23 71 3.8 -9 679.30 -59.0 -54.0 -56.9 64 -99 SPO 1997 10 14 19 24 72 3.7 -9 679.30 -59.0 -54.2 -56.8 63 -99 SPO 1997 10 14 19 25 72 3.7 -9 679.30 -59.1 -54.4 -56.7 63 -99 SPO 1997 10 14 19 26 72 3.6 -9 679.30 -59.2 -54.6 -56.6 63 -99 SPO 1997 10 14 19 27 69 3.5 -9 679.30 -59.2 -54.8 -56.6 63 -99 SPO 1997 10 14 19 28 69 3.4 -9 679.30 -59.3 -55.0 -56.5 63 -99 SPO 1997 10 14 19 29 70 3.4 -9 679.30 -59.4 -55.2 -56.6 64 -99 SPO 1997 10 14 19 30 70 3.4 -9 679.30 -59.4 -55.2 -56.5 64 -99 SPO 1997 10 14 19 31 72 3.3 -9 679.30 -59.4 -55.2 -56.4 64 -99 SPO 1997 10 14 19 32 73 3.2 -9 679.30 -59.4 -55.3 -56.4 64 -99 SPO 1997 10 14 19 33 75 3.3 -9 679.30 -59.4 -55.3 -56.4 64 -99 SPO 1997 10 14 19 34 74 3.4 -9 679.30 -59.4 -55.3 -56.4 64 -99 SPO 1997 10 14 19 35 74 3.5 -9 679.30 -59.4 -55.2 -56.4 64 -99 SPO 1997 10 14 19 36 74 3.6 -9 679.30 -59.4 -55.1 -56.4 63 -99 SPO 1997 10 14 19 37 74 3.7 -9 679.30 -59.4 -55.0 -56.5 62 -99 SPO 1997 10 14 19 38 73 3.9 -9 679.30 -59.4 -55.1 -56.6 62 -99 SPO 1997 10 14 19 39 73 4.2 -9 679.30 -59.3 -55.0 -56.6 61 -99 SPO 1997 10 14 19 40 73 4.4 -9 679.30 -59.2 -54.9 -56.8 61 -99 SPO 1997 10 14 19 41 72 4.4 -9 679.30 -59.1 -54.7 -56.8 61 -99 SPO 1997 10 14 19 42 72 4.5 -9 679.30 -59.0 -54.6 -56.9 61 -99 SPO 1997 10 14 19 43 72 4.7 -9 679.30 -59.0 -54.4 -56.9 61 -99 SPO 1997 10 14 19 44 70 4.8 -9 679.30 -58.9 -54.2 -57.0 60 -99 SPO 1997 10 14 19 45 69 4.8 -9 679.30 -58.8 -54.1 -57.0 59 -99 SPO 1997 10 14 19 46 67 4.8 -9 679.30 -58.8 -54.1 -57.0 61 -99 SPO 1997 10 14 19 47 66 4.9 -9 679.30 -58.7 -54.0 -57.0 61 -99 SPO 1997 10 14 19 48 65 5.0 -9 679.30 -58.7 -53.9 -57.0 61 -99 SPO 1997 10 14 19 49 62 5.0 -9 679.30 -58.6 -53.7 -57.0 61 -99 SPO 1997 10 14 19 50 61 5.1 -9 679.30 -58.6 -53.6 -57.0 62 -99 SPO 1997 10 14 19 51 60 5.0 -9 679.30 -58.6 -53.6 -57.0 62 -99 SPO 1997 10 14 19 52 59 4.9 -9 679.30 -58.6 -53.6 -57.0 62 -99 SPO 1997 10 14 19 53 59 4.8 -9 679.30 -58.6 -53.5 -56.9 62 -99 SPO 1997 10 14 19 54 58 4.8 -9 679.30 -58.5 -53.4 -56.9 63 -99 SPO 1997 10 14 19 55 57 4.9 -9 679.30 -58.5 -53.4 -56.9 64 -99 SPO 1997 10 14 19 56 58 4.9 -9 679.30 -58.5 -53.2 -56.9 65 -99 SPO 1997 10 14 19 57 57 4.9 -9 679.30 -58.5 -53.2 -56.9 66 -99 SPO 1997 10 14 19 58 59 4.7 -9 679.30 -58.5 -53.2 -56.9 66 -99 SPO 1997 10 14 19 59 60 4.9 -9 679.30 -58.5 -53.1 -56.9 66 -99 SPO 1997 10 14 20 00 60 4.8 -9 679.30 -58.5 -53.2 -56.9 66 0 SPO 1997 10 14 20 01 60 4.4 -9 679.30 -58.5 -53.4 -56.9 67 -99 SPO 1997 10 14 20 02 58 3.9 -9 679.30 -58.5 -53.5 -56.8 66 -99 SPO 1997 10 14 20 03 55 3.2 -9 679.30 -58.6 -53.8 -56.8 66 -99 SPO 1997 10 14 20 04 53 2.6 -9 679.40 -58.6 -54.4 -56.7 67 -99 SPO 1997 10 14 20 05 53 2.7 -9 679.40 -58.6 -54.8 -56.6 67 -99 SPO 1997 10 14 20 06 54 2.7 -9 679.40 -58.6 -54.7 -56.6 68 -99 SPO 1997 10 14 20 07 54 2.7 -9 679.40 -58.6 -54.7 -56.5 70 -99 SPO 1997 10 14 20 08 56 2.7 -9 679.40 -58.6 -54.6 -56.4 70 -99 SPO 1997 10 14 20 09 58 2.7 -9 679.40 -58.6 -54.7 -56.4 71 -99 SPO 1997 10 14 20 10 59 3.0 -9 679.40 -58.7 -54.7 -56.4 72 -99 SPO 1997 10 14 20 11 60 3.0 -9 679.40 -58.7 -54.6 -56.3 72 -99 SPO 1997 10 14 20 12 60 3.1 -9 679.40 -58.7 -54.5 -56.3 72 -99 SPO 1997 10 14 20 13 61 3.1 -9 679.40 -58.7 -54.4 -56.3 72 -99 SPO 1997 10 14 20 14 62 3.3 -9 679.40 -58.8 -54.3 -56.3 72 -99 SPO 1997 10 14 20 15 62 3.5 -9 679.40 -58.8 -54.3 -56.4 72 -99 SPO 1997 10 14 20 16 61 3.7 -9 679.40 -58.8 -54.2 -56.5 70 -99 SPO 1997 10 14 20 17 62 3.7 -9 679.40 -58.8 -54.2 -56.6 69 -99 SPO 1997 10 14 20 18 63 3.8 -9 679.40 -58.8 -54.2 -56.7 69 -99 SPO 1997 10 14 20 19 65 4.0 -9 679.40 -58.8 -54.1 -56.8 69 -99 SPO 1997 10 14 20 20 65 4.1 -9 679.40 -58.9 -54.1 -57.0 70 -99 SPO 1997 10 14 20 21 66 4.1 -9 679.40 -58.9 -54.2 -57.0 70 -99 SPO 1997 10 14 20 22 67 4.3 -9 679.30 -59.0 -54.2 -57.2 70 -99 SPO 1997 10 14 20 23 66 4.4 -9 679.30 -59.0 -54.0 -57.2 70 -99 SPO 1997 10 14 20 24 67 4.4 -9 679.30 -59.1 -54.0 -57.3 71 -99 SPO 1997 10 14 20 25 66 4.3 -9 679.30 -59.1 -54.2 -57.4 70 -99 SPO 1997 10 14 20 26 66 4.2 -9 679.30 -59.2 -54.2 -57.4 71 -99 SPO 1997 10 14 20 27 66 4.0 -9 679.40 -59.2 -54.2 -57.4 69 -99 SPO 1997 10 14 20 28 67 3.7 -9 679.40 -59.2 -54.4 -57.4 68 -99 SPO 1997 10 14 20 29 68 3.5 -9 679.40 -59.2 -54.5 -57.4 67 -99 SPO 1997 10 14 20 30 67 3.4 -9 679.40 -59.3 -54.7 -57.3 68 -99 SPO 1997 10 14 20 31 67 3.2 -9 679.40 -59.3 -54.9 -57.3 67 -99 SPO 1997 10 14 20 32 65 2.9 -9 679.40 -59.3 -55.0 -57.2 67 -99 SPO 1997 10 14 20 33 62 2.6 -9 679.40 -59.3 -55.2 -57.3 67 -99 SPO 1997 10 14 20 34 61 2.6 -9 679.40 -59.3 -55.3 -57.2 68 -99 SPO 1997 10 14 20 35 58 2.7 -9 679.40 -59.3 -55.2 -57.2 69 -99 SPO 1997 10 14 20 36 58 2.9 -9 679.40 -59.3 -55.0 -57.3 70 -99 SPO 1997 10 14 20 37 59 3.2 -9 679.40 -59.2 -54.9 -57.3 69 -99 SPO 1997 10 14 20 38 60 3.5 -9 679.40 -59.2 -54.8 -57.3 69 -99 SPO 1997 10 14 20 39 62 3.7 -9 679.40 -59.1 -54.5 -57.3 68 -99 SPO 1997 10 14 20 40 63 3.9 -9 679.40 -59.1 -54.4 -57.4 68 -99 SPO 1997 10 14 20 41 62 3.9 -9 679.40 -59.1 -54.2 -57.4 68 -99 SPO 1997 10 14 20 42 61 3.8 -9 679.40 -59.1 -54.2 -57.4 68 -99 SPO 1997 10 14 20 43 60 3.6 -9 679.40 -59.1 -54.1 -57.4 68 -99 SPO 1997 10 14 20 44 61 3.4 -9 679.40 -59.1 -54.2 -57.4 68 -99 SPO 1997 10 14 20 45 60 3.4 -9 679.40 -59.2 -54.2 -57.4 69 -99 SPO 1997 10 14 20 46 61 3.4 -9 679.40 -59.2 -54.3 -57.4 68 -99 SPO 1997 10 14 20 47 61 3.4 -9 679.40 -59.1 -54.2 -57.4 68 -99 SPO 1997 10 14 20 48 59 3.5 -9 679.40 -59.2 -54.1 -57.4 69 -99 SPO 1997 10 14 20 49 58 3.3 -9 679.40 -59.1 -54.0 -57.4 68 -99 SPO 1997 10 14 20 50 57 3.2 -9 679.40 -59.0 -54.1 -57.4 67 -99 SPO 1997 10 14 20 51 57 3.2 -9 679.40 -59.1 -54.2 -57.4 69 -99 SPO 1997 10 14 20 52 57 3.2 -9 679.50 -59.0 -54.3 -57.3 68 -99 SPO 1997 10 14 20 53 57 3.2 -9 679.50 -59.0 -54.4 -57.3 68 -99 SPO 1997 10 14 20 54 59 3.1 -9 679.50 -59.0 -54.3 -57.3 68 -99 SPO 1997 10 14 20 55 60 2.9 -9 679.50 -59.0 -54.2 -57.2 68 -99 SPO 1997 10 14 20 56 59 3.0 -9 679.50 -59.0 -54.2 -57.2 67 -99 SPO 1997 10 14 20 57 60 2.8 -9 679.50 -59.0 -54.2 -57.1 66 -99 SPO 1997 10 14 20 58 58 2.6 -9 679.50 -59.0 -54.4 -57.1 67 -99 SPO 1997 10 14 20 59 56 2.6 -9 679.50 -59.1 -54.6 -57.0 68 -99 SPO 1997 10 14 21 00 57 2.9 -9 679.50 -59.0 -54.5 -56.9 67 0 SPO 1997 10 14 21 01 60 3.1 -9 679.50 -59.0 -54.3 -56.9 68 -99 SPO 1997 10 14 21 02 63 3.0 -9 679.50 -59.0 -54.4 -56.8 68 -99 SPO 1997 10 14 21 03 62 2.9 -9 679.50 -59.1 -54.8 -56.7 69 -99 SPO 1997 10 14 21 04 62 2.7 -9 679.60 -59.2 -55.1 -56.6 71 -99 SPO 1997 10 14 21 05 64 2.6 -9 679.60 -59.2 -55.4 -56.6 70 -99 SPO 1997 10 14 21 06 65 2.5 -9 679.60 -59.3 -55.5 -56.6 70 -99 SPO 1997 10 14 21 07 63 2.4 -9 679.60 -59.4 -55.6 -56.6 70 -99 SPO 1997 10 14 21 08 63 2.4 -9 679.60 -59.5 -55.7 -56.5 70 -99 SPO 1997 10 14 21 09 63 2.5 -9 679.60 -59.6 -55.7 -56.4 70 -99 SPO 1997 10 14 21 10 64 3.0 -9 679.60 -59.5 -55.4 -56.4 69 -99 SPO 1997 10 14 21 11 64 3.5 -9 679.60 -59.2 -55.0 -56.6 67 -99 SPO 1997 10 14 21 12 64 3.6 -9 679.60 -59.1 -54.8 -56.8 68 -99 SPO 1997 10 14 21 13 63 3.7 -9 679.60 -59.2 -54.6 -57.0 69 -99 SPO 1997 10 14 21 14 61 3.9 -9 679.60 -59.2 -54.4 -57.2 69 -99 SPO 1997 10 14 21 15 60 3.7 -9 679.60 -59.2 -54.1 -57.4 67 -99 SPO 1997 10 14 21 16 59 3.7 -9 679.50 -59.2 -53.9 -57.5 67 -99 SPO 1997 10 14 21 17 59 3.8 -9 679.50 -59.1 -53.7 -57.5 67 -99 SPO 1997 10 14 21 18 58 3.9 -9 679.50 -59.2 -54.0 -57.6 69 -99 SPO 1997 10 14 21 19 59 4.0 -9 679.50 -59.1 -53.8 -57.6 68 -99 SPO 1997 10 14 21 20 58 4.0 -9 679.50 -59.2 -53.8 -57.7 68 -99 SPO 1997 10 14 21 21 59 4.0 -9 679.50 -59.2 -54.0 -57.7 67 -99 SPO 1997 10 14 21 22 58 4.2 -9 679.50 -59.1 -54.0 -57.7 66 -99 SPO 1997 10 14 21 23 57 4.2 -9 679.50 -59.2 -54.1 -57.8 67 -99 SPO 1997 10 14 21 24 58 4.4 -9 679.50 -59.2 -54.0 -57.8 67 -99 SPO 1997 10 14 21 25 54 4.7 -9 679.50 -59.2 -54.2 -57.9 67 -99 SPO 1997 10 14 21 26 57 4.3 -9 679.50 -59.2 -54.1 -58.0 68 -99 SPO 1997 10 14 21 27 56 4.3 -9 679.50 -59.2 -54.1 -58.0 68 -99 SPO 1997 10 14 21 28 57 4.4 -9 679.50 -59.2 -54.1 -58.1 68 -99 SPO 1997 10 14 21 29 57 4.5 -9 679.50 -59.2 -54.0 -58.2 67 -99 SPO 1997 10 14 21 30 55 4.6 -9 679.50 -59.3 -53.8 -58.2 68 -99 SPO 1997 10 14 21 31 53 4.6 -9 679.50 -59.3 -53.7 -58.2 68 -99 SPO 1997 10 14 21 32 53 4.6 -9 679.50 -59.2 -53.5 -58.2 66 -99 SPO 1997 10 14 21 33 54 4.6 -9 679.50 -59.1 -53.5 -58.2 65 -99 SPO 1997 10 14 21 34 54 4.6 -9 679.50 -59.2 -53.8 -58.3 65 -99 SPO 1997 10 14 21 35 55 4.8 -9 679.50 -59.2 -53.7 -58.3 65 -99 SPO 1997 10 14 21 36 56 4.7 -9 679.50 -59.2 -53.8 -58.4 65 -99 SPO 1997 10 14 21 37 57 4.7 -9 679.50 -59.2 -53.6 -58.4 65 -99 SPO 1997 10 14 21 38 56 5.0 -9 679.50 -59.3 -53.6 -58.4 66 -99 SPO 1997 10 14 21 39 56 4.8 -9 679.50 -59.3 -53.7 -58.5 66 -99 SPO 1997 10 14 21 40 56 5.1 -9 679.50 -59.4 -53.2 -58.5 68 -99 SPO 1997 10 14 21 41 58 5.1 -9 679.50 -59.3 -53.0 -58.5 67 -99 SPO 1997 10 14 21 42 59 5.2 -9 679.50 -59.3 -53.2 -58.5 67 -99 SPO 1997 10 14 21 43 59 5.3 -9 679.50 -59.2 -53.6 -58.5 66 -99 SPO 1997 10 14 21 44 59 5.4 -9 679.40 -59.3 -53.4 -58.5 67 -99 SPO 1997 10 14 21 45 60 5.5 -9 679.40 -59.3 -53.0 -58.5 66 -99 SPO 1997 10 14 21 46 60 5.4 -9 679.40 -59.3 -53.0 -58.6 66 -99 SPO 1997 10 14 21 47 58 5.4 -9 679.40 -59.3 -53.1 -58.6 65 -99 SPO 1997 10 14 21 48 59 5.1 -9 679.50 -59.2 -53.4 -58.6 65 -99 SPO 1997 10 14 21 49 59 5.0 -9 679.50 -59.1 -53.7 -58.6 65 -99 SPO 1997 10 14 21 50 60 4.9 -9 679.50 -59.1 -53.8 -58.6 65 -99 SPO 1997 10 14 21 51 60 5.0 -9 679.50 -59.0 -53.7 -58.6 65 -99 SPO 1997 10 14 21 52 60 4.9 -9 679.50 -59.2 -53.6 -58.6 67 -99 SPO 1997 10 14 21 53 60 5.0 -9 679.50 -59.2 -53.4 -58.7 67 -99 SPO 1997 10 14 21 54 60 5.0 -9 679.50 -59.2 -53.4 -58.7 67 -99 SPO 1997 10 14 21 55 60 4.8 -9 679.60 -59.3 -53.6 -58.7 69 -99 SPO 1997 10 14 21 56 61 5.0 -9 679.60 -59.3 -53.6 -58.6 68 -99 SPO 1997 10 14 21 57 60 4.9 -9 679.60 -59.3 -53.4 -58.5 68 -99 SPO 1997 10 14 21 58 59 4.8 -9 679.60 -59.3 -53.1 -58.4 67 -99 SPO 1997 10 14 21 59 59 4.8 -9 679.60 -59.2 -53.0 -58.4 66 -99 SPO 1997 10 14 22 00 59 4.7 -9 679.60 -59.2 -53.0 -58.4 67 0 SPO 1997 10 14 22 01 59 4.8 -9 679.60 -59.2 -53.0 -58.3 67 -99 SPO 1997 10 14 22 02 58 4.9 -9 679.60 -59.2 -53.0 -58.3 67 -99 SPO 1997 10 14 22 03 58 5.0 -9 679.60 -59.2 -53.0 -58.2 67 -99 SPO 1997 10 14 22 04 58 5.1 -9 679.60 -59.2 -52.8 -58.2 67 -99 SPO 1997 10 14 22 05 57 5.1 -9 679.60 -59.1 -52.8 -58.1 66 -99 SPO 1997 10 14 22 06 56 5.2 -9 679.60 -59.1 -52.8 -58.1 65 -99 SPO 1997 10 14 22 07 55 5.2 -9 679.60 -59.1 -52.8 -58.0 66 -99 SPO 1997 10 14 22 08 54 5.2 -9 679.60 -59.1 -52.6 -58.0 66 -99 SPO 1997 10 14 22 09 53 5.3 -9 679.60 -59.1 -52.6 -58.0 66 -99 SPO 1997 10 14 22 10 53 5.3 -9 679.60 -59.1 -52.6 -58.0 66 -99 SPO 1997 10 14 22 11 53 5.4 -9 679.60 -59.1 -52.6 -58.0 66 -99 SPO 1997 10 14 22 12 52 5.5 -9 679.60 -59.0 -52.5 -57.9 65 -99 SPO 1997 10 14 22 13 51 5.5 -9 679.60 -59.0 -52.3 -57.9 65 -99 SPO 1997 10 14 22 14 51 5.5 -9 679.60 -59.0 -52.2 -57.9 65 -99 SPO 1997 10 14 22 15 50 5.4 -9 679.60 -58.9 -52.2 -57.8 65 -99 SPO 1997 10 14 22 16 51 5.6 -9 679.60 -58.9 -52.0 -57.8 66 -99 SPO 1997 10 14 22 17 51 5.5 -9 679.60 -58.9 -51.8 -57.8 66 -99 SPO 1997 10 14 22 18 50 5.5 -9 679.60 -58.8 -51.9 -57.8 66 -99 SPO 1997 10 14 22 19 50 5.5 -9 679.60 -58.8 -51.9 -57.7 67 -99 SPO 1997 10 14 22 20 50 5.5 -9 679.60 -58.8 -51.8 -57.6 66 -99 SPO 1997 10 14 22 21 51 5.6 -9 679.50 -58.8 -51.7 -57.6 66 -99 SPO 1997 10 14 22 22 52 5.5 -9 679.50 -58.7 -51.6 -57.6 65 -99 SPO 1997 10 14 22 23 53 5.5 -9 679.60 -58.7 -51.8 -57.6 65 -99 SPO 1997 10 14 22 24 54 5.5 -9 679.60 -58.8 -52.2 -57.6 65 -99 SPO 1997 10 14 22 25 53 5.3 -9 679.60 -58.8 -52.3 -57.6 66 -99 SPO 1997 10 14 22 26 54 5.1 -9 679.60 -58.9 -52.4 -57.6 67 -99 SPO 1997 10 14 22 27 54 5.4 -9 679.60 -58.9 -52.6 -57.6 67 -99 SPO 1997 10 14 22 28 52 5.2 -9 679.60 -58.9 -52.4 -57.6 67 -99 SPO 1997 10 14 22 29 51 5.2 -9 679.60 -58.9 -52.4 -57.6 66 -99 SPO 1997 10 14 22 30 50 5.1 -9 679.60 -58.9 -52.5 -57.5 66 -99 SPO 1997 10 14 22 31 49 5.1 -9 679.60 -58.9 -52.4 -57.5 66 -99 SPO 1997 10 14 22 32 50 5.0 -9 679.60 -58.8 -52.2 -57.6 65 -99 SPO 1997 10 14 22 33 50 5.1 -9 679.60 -58.8 -52.2 -57.8 65 -99 SPO 1997 10 14 22 34 52 5.1 -9 679.60 -58.8 -52.2 -58.0 65 -99 SPO 1997 10 14 22 35 53 5.2 -9 679.60 -58.8 -52.1 -58.1 65 -99 SPO 1997 10 14 22 36 53 5.1 -9 679.60 -58.8 -52.1 -58.1 65 -99 SPO 1997 10 14 22 37 53 5.1 -9 679.60 -58.8 -52.0 -58.1 66 -99 SPO 1997 10 14 22 38 54 5.0 -9 679.60 -58.7 -52.0 -58.1 65 -99 SPO 1997 10 14 22 39 53 5.1 -9 679.60 -58.8 -51.8 -58.0 67 -99 SPO 1997 10 14 22 40 54 5.1 -9 679.60 -58.8 -51.8 -57.8 67 -99 SPO 1997 10 14 22 41 55 5.1 -9 679.60 -58.8 -51.8 -57.6 68 -99 SPO 1997 10 14 22 42 55 5.2 -9 679.60 -58.8 -52.0 -57.6 67 -99 SPO 1997 10 14 22 43 56 5.0 -9 679.60 -58.9 -52.1 -57.6 68 -99 SPO 1997 10 14 22 44 58 5.1 -9 679.60 -58.9 -52.2 -57.6 66 -99 SPO 1997 10 14 22 45 58 5.1 -9 679.60 -59.0 -52.4 -57.6 67 -99 SPO 1997 10 14 22 46 58 5.1 -9 679.60 -59.0 -52.6 -57.6 66 -99 SPO 1997 10 14 22 47 56 5.2 -9 679.50 -59.0 -52.4 -57.7 66 -99 SPO 1997 10 14 22 48 55 5.3 -9 679.50 -59.0 -51.9 -57.7 65 -99 SPO 1997 10 14 22 49 54 5.3 -9 679.50 -58.9 -51.5 -57.7 65 -99 SPO 1997 10 14 22 50 54 5.2 -9 679.50 -58.9 -51.4 -57.7 65 -99 SPO 1997 10 14 22 51 54 5.2 -9 679.50 -58.9 -51.3 -57.7 66 -99 SPO 1997 10 14 22 52 54 5.3 -9 679.50 -58.9 -51.3 -57.7 67 -99 SPO 1997 10 14 22 53 54 5.3 -9 679.50 -58.9 -51.2 -57.7 67 -99 SPO 1997 10 14 22 54 54 5.2 -9 679.50 -58.9 -51.2 -57.8 68 -99 SPO 1997 10 14 22 55 54 5.2 -9 679.50 -58.9 -51.2 -58.0 67 -99 SPO 1997 10 14 22 56 54 5.1 -9 679.50 -58.9 -51.2 -58.2 66 -99 SPO 1997 10 14 22 57 54 4.9 -9 679.50 -58.9 -51.5 -58.3 66 -99 SPO 1997 10 14 22 58 54 4.9 -9 679.50 -58.9 -51.6 -58.4 66 -99 SPO 1997 10 14 22 59 55 4.9 -9 679.50 -59.0 -51.7 -58.4 67 -99 SPO 1997 10 14 23 00 56 4.9 -9 679.50 -59.0 -51.8 -58.4 66 0 SPO 1997 10 14 23 01 56 5.0 -9 679.50 -59.0 -51.7 -58.4 66 -99 SPO 1997 10 14 23 02 55 5.1 -9 679.50 -59.0 -51.5 -58.3 67 -99 SPO 1997 10 14 23 03 55 5.2 -9 679.50 -59.1 -51.4 -58.1 68 -99 SPO 1997 10 14 23 04 56 5.1 -9 679.50 -59.1 -51.4 -58.0 69 -99 SPO 1997 10 14 23 05 56 5.1 -9 679.50 -59.1 -51.3 -57.9 69 -99 SPO 1997 10 14 23 06 57 5.0 -9 679.50 -59.1 -51.4 -57.9 69 -99 SPO 1997 10 14 23 07 58 5.0 -9 679.50 -59.1 -51.6 -58.0 69 -99 SPO 1997 10 14 23 08 58 4.9 -9 679.50 -59.1 -51.8 -58.2 69 -99 SPO 1997 10 14 23 09 58 4.9 -9 679.50 -59.1 -51.9 -58.4 68 -99 SPO 1997 10 14 23 10 59 4.7 -9 679.50 -59.1 -51.9 -58.6 66 -99 SPO 1997 10 14 23 11 58 4.5 -9 679.50 -59.1 -51.8 -58.6 66 -99 SPO 1997 10 14 23 12 58 4.5 -9 679.60 -59.1 -51.7 -58.6 65 -99 SPO 1997 10 14 23 13 58 4.4 -9 679.50 -59.0 -51.8 -58.4 65 -99 SPO 1997 10 14 23 14 57 4.2 -9 679.60 -59.0 -51.9 -58.0 65 -99 SPO 1997 10 14 23 15 57 4.3 -9 679.60 -59.0 -52.1 -57.8 65 -99 SPO 1997 10 14 23 16 56 4.4 -9 679.60 -59.0 -52.0 -57.7 65 -99 SPO 1997 10 14 23 17 55 4.4 -9 679.60 -59.0 -52.0 -57.7 65 -99 SPO 1997 10 14 23 18 56 4.3 -9 679.60 -58.9 -51.9 -57.6 65 -99 SPO 1997 10 14 23 19 57 4.3 -9 679.60 -58.9 -52.0 -57.6 66 -99 SPO 1997 10 14 23 20 59 4.3 -9 679.60 -58.8 -51.9 -57.6 65 -99 SPO 1997 10 14 23 21 61 4.2 -9 679.60 -58.8 -51.9 -57.6 65 -99 SPO 1997 10 14 23 22 62 4.1 -9 679.60 -58.8 -51.9 -57.5 65 -99 SPO 1997 10 14 23 23 65 4.0 -9 679.60 -59.0 -52.0 -57.4 66 -99 SPO 1997 10 14 23 24 66 3.9 -9 679.60 -59.0 -52.3 -57.4 66 -99 SPO 1997 10 14 23 25 66 3.8 -9 679.60 -59.1 -52.3 -57.2 66 -99 SPO 1997 10 14 23 26 66 3.8 -9 679.60 -59.2 -52.3 -57.2 66 -99 SPO 1997 10 14 23 27 66 3.8 -9 679.60 -59.2 -52.5 -57.3 66 -99 SPO 1997 10 14 23 28 64 3.9 -9 679.60 -59.3 -52.6 -57.4 66 -99 SPO 1997 10 14 23 29 63 3.9 -9 679.60 -59.3 -52.5 -57.6 66 -99 SPO 1997 10 14 23 30 62 4.0 -9 679.60 -59.3 -52.4 -58.1 66 -99 SPO 1997 10 14 23 31 62 3.9 -9 679.60 -59.3 -52.2 -58.3 66 -99 SPO 1997 10 14 23 32 63 3.8 -9 679.60 -59.4 -52.2 -58.3 67 -99 SPO 1997 10 14 23 33 63 3.8 -9 679.60 -59.4 -52.2 -58.0 66 -99 SPO 1997 10 14 23 34 63 3.8 -9 679.70 -59.4 -52.2 -57.7 66 -99 SPO 1997 10 14 23 35 63 3.9 -9 679.70 -59.4 -52.2 -57.6 66 -99 SPO 1997 10 14 23 36 63 4.0 -9 679.60 -59.4 -52.2 -57.6 65 -99 SPO 1997 10 14 23 37 63 4.0 -9 679.60 -59.4 -52.2 -57.6 65 -99 SPO 1997 10 14 23 38 64 4.0 -9 679.60 -59.5 -52.4 -57.6 65 -99 SPO 1997 10 14 23 39 65 4.1 -9 679.60 -59.6 -52.4 -57.6 67 -99 SPO 1997 10 14 23 40 65 4.1 -9 679.70 -59.6 -52.2 -57.5 66 -99 SPO 1997 10 14 23 41 64 4.0 -9 679.70 -59.7 -52.2 -57.5 66 -99 SPO 1997 10 14 23 42 64 4.0 -9 679.70 -59.7 -52.2 -57.7 66 -99 SPO 1997 10 14 23 43 64 4.0 -9 679.70 -59.7 -52.2 -57.9 65 -99 SPO 1997 10 14 23 44 64 4.0 -9 679.70 -59.7 -52.4 -57.9 65 -99 SPO 1997 10 14 23 45 64 4.1 -9 679.70 -59.7 -52.5 -57.7 64 -99 SPO 1997 10 14 23 46 63 4.1 -9 679.70 -59.8 -52.4 -57.6 65 -99 SPO 1997 10 14 23 47 63 4.0 -9 679.70 -59.8 -52.5 -57.7 65 -99 SPO 1997 10 14 23 48 63 3.8 -9 679.70 -59.8 -52.8 -57.7 65 -99 SPO 1997 10 14 23 49 64 3.8 -9 679.70 -59.9 -53.0 -57.6 66 -99 SPO 1997 10 14 23 50 65 3.7 -9 679.70 -59.9 -53.2 -57.6 65 -99 SPO 1997 10 14 23 51 65 3.8 -9 679.70 -59.9 -53.4 -57.5 64 -99 SPO 1997 10 14 23 52 65 4.0 -9 679.70 -60.0 -53.4 -57.5 65 -99 SPO 1997 10 14 23 53 64 4.2 -9 679.70 -60.0 -53.2 -57.6 67 -99 SPO 1997 10 14 23 54 64 4.1 -9 679.70 -60.0 -53.2 -57.8 67 -99 SPO 1997 10 14 23 55 64 4.0 -9 679.70 -60.1 -53.6 -57.8 67 -99 SPO 1997 10 14 23 56 64 4.2 -9 679.70 -60.1 -53.7 -57.8 67 -99 SPO 1997 10 14 23 57 63 4.3 -9 679.60 -60.1 -53.0 -57.8 67 -99 SPO 1997 10 14 23 58 62 4.3 -9 679.60 -60.1 -52.6 -58.0 -99 -99 SPO 1997 10 14 23 59 62 4.2 -9 679.60 -60.1 -52.5 -58.0 -99 -99 SPO 1997 10 15 00 00 63 4.0 -9 679.70 -60.1 -52.6 -57.8 -99 0 SPO 1997 10 15 00 01 64 3.8 -9 679.70 -60.1 -53.0 -57.7 -99 -99 SPO 1997 10 15 00 02 64 3.8 -9 679.70 -60.1 -53.1 -57.6 -99 -99 SPO 1997 10 15 00 03 64 3.8 -9 679.70 -60.2 -53.3 -57.7 65 -99 SPO 1997 10 15 00 04 64 3.8 -9 679.70 -60.2 -53.4 -57.8 65 -99 SPO 1997 10 15 00 05 66 3.8 -9 679.60 -60.2 -53.4 -57.7 65 -99 SPO 1997 10 15 00 06 67 3.8 -9 679.60 -60.2 -53.5 -57.7 66 -99 SPO 1997 10 15 00 07 67 4.0 -9 679.60 -60.2 -53.4 -57.7 65 -99 SPO 1997 10 15 00 08 65 4.0 -9 679.60 -60.2 -53.8 -57.7 65 -99 SPO 1997 10 15 00 09 63 4.0 -9 679.60 -60.3 -53.8 -57.8 67 -99 SPO 1997 10 15 00 10 61 4.1 -9 679.60 -60.3 -53.4 -58.0 67 -99 SPO 1997 10 15 00 11 59 4.1 -9 679.60 -60.3 -53.0 -58.0 68 -99 SPO 1997 10 15 00 12 59 4.2 -9 679.60 -60.3 -53.0 -58.1 68 -99 SPO 1997 10 15 00 13 60 4.1 -9 679.60 -60.3 -52.8 -58.3 68 -99 SPO 1997 10 15 00 14 62 3.8 -9 679.70 -60.2 -52.9 -58.5 67 -99 SPO 1997 10 15 00 15 63 3.7 -9 679.70 -60.3 -53.6 -58.6 66 -99 SPO 1997 10 15 00 16 62 3.7 -9 679.70 -60.3 -53.6 -58.6 66 -99 SPO 1997 10 15 00 17 60 3.8 -9 679.70 -60.3 -53.5 -58.3 65 -99 SPO 1997 10 15 00 18 60 3.9 -9 679.70 -60.2 -52.9 -58.0 65 -99 SPO 1997 10 15 00 19 60 4.0 -9 679.70 -60.2 -52.7 -57.8 66 -99 SPO 1997 10 15 00 20 59 4.0 -9 679.70 -60.2 -52.7 -57.8 66 -99 SPO 1997 10 15 00 21 59 4.0 -9 679.70 -60.2 -52.5 -57.8 66 -99 SPO 1997 10 15 00 22 58 4.1 -9 679.70 -60.1 -52.2 -57.9 66 -99 SPO 1997 10 15 00 23 58 4.0 -9 679.70 -60.1 -52.1 -57.9 66 -99 SPO 1997 10 15 00 24 57 3.9 -9 679.70 -60.1 -51.9 -57.9 67 -99 SPO 1997 10 15 00 25 55 4.1 -9 679.70 -60.1 -52.1 -57.9 67 -99 SPO 1997 10 15 00 26 55 4.3 -9 679.70 -60.1 -52.3 -58.0 68 -99 SPO 1997 10 15 00 27 55 4.3 -9 679.70 -60.0 -52.4 -58.0 66 -99 SPO 1997 10 15 00 28 56 4.2 -9 679.70 -60.0 -52.7 -58.0 66 -99 SPO 1997 10 15 00 29 56 4.2 -9 679.70 -60.1 -52.6 -58.0 66 -99 SPO 1997 10 15 00 30 56 4.1 -9 679.70 -60.0 -52.7 -58.0 64 -99 SPO 1997 10 15 00 31 57 4.0 -9 679.70 -60.0 -52.8 -58.0 64 -99 SPO 1997 10 15 00 32 57 4.1 -9 679.70 -60.0 -52.6 -58.0 65 -99 SPO 1997 10 15 00 33 56 4.1 -9 679.70 -60.0 -52.3 -58.2 66 -99 SPO 1997 10 15 00 34 55 4.1 -9 679.70 -59.9 -52.2 -58.5 65 -99 SPO 1997 10 15 00 35 55 4.2 -9 679.70 -59.8 -52.0 -58.8 65 -99 SPO 1997 10 15 00 36 54 4.2 -9 679.70 -59.8 -51.9 -58.8 65 -99 SPO 1997 10 15 00 37 54 4.3 -9 679.70 -59.8 -52.0 -58.4 65 -99 SPO 1997 10 15 00 38 54 4.3 -9 679.70 -59.7 -51.8 -58.3 65 -99 SPO 1997 10 15 00 39 55 4.3 -9 679.70 -59.6 -51.6 -58.6 65 -99 SPO 1997 10 15 00 40 57 4.2 -9 679.70 -59.6 -51.7 -58.8 65 -99 SPO 1997 10 15 00 41 57 4.1 -9 679.80 -59.6 -52.0 -59.0 65 -99 SPO 1997 10 15 00 42 59 4.1 -9 679.80 -59.6 -52.3 -59.0 65 -99 SPO 1997 10 15 00 43 61 4.0 -9 679.80 -59.7 -52.4 -58.8 66 -99 SPO 1997 10 15 00 44 63 4.0 -9 679.80 -59.7 -52.6 -58.4 66 -99 SPO 1997 10 15 00 45 65 4.0 -9 679.80 -59.8 -52.8 -58.1 67 -99 SPO 1997 10 15 00 46 66 3.8 -9 679.80 -59.8 -53.1 -58.0 67 -99 SPO 1997 10 15 00 47 67 3.8 -9 679.80 -59.8 -53.4 -57.9 67 -99 SPO 1997 10 15 00 48 68 3.8 -9 679.80 -59.8 -53.3 -57.8 66 -99 SPO 1997 10 15 00 49 69 3.8 -9 679.80 -59.8 -53.8 -57.7 67 -99 SPO 1997 10 15 00 50 68 3.9 -9 679.80 -59.8 -54.0 -57.7 67 -99 SPO 1997 10 15 00 51 69 3.8 -9 679.80 -59.8 -54.0 -57.6 67 -99 SPO 1997 10 15 00 52 70 3.8 -9 679.80 -59.8 -54.1 -57.6 67 -99 SPO 1997 10 15 00 53 70 3.7 -9 679.80 -59.8 -54.3 -57.5 67 -99 SPO 1997 10 15 00 54 68 3.9 -9 679.80 -59.8 -54.6 -57.6 65 -99 SPO 1997 10 15 00 55 67 4.0 -9 679.70 -59.8 -54.5 -57.7 65 -99 SPO 1997 10 15 00 56 67 4.2 -9 679.70 -59.8 -54.2 -57.8 65 -99 SPO 1997 10 15 00 57 66 4.4 -9 679.70 -59.8 -53.6 -57.9 66 -99 SPO 1997 10 15 00 58 65 4.4 -9 679.70 -59.8 -53.8 -58.0 66 -99 SPO 1997 10 15 00 59 65 4.5 -9 679.70 -59.8 -53.6 -58.0 67 -99 SPO 1997 10 15 01 00 64 4.6 -9 679.70 -59.7 -53.6 -58.0 66 0 SPO 1997 10 15 01 01 63 4.6 -9 679.70 -59.7 -53.4 -58.0 66 -99 SPO 1997 10 15 01 02 63 4.6 -9 679.70 -59.7 -53.2 -58.0 66 -99 SPO 1997 10 15 01 03 64 4.7 -9 679.70 -59.7 -52.7 -58.1 66 -99 SPO 1997 10 15 01 04 64 4.7 -9 679.70 -59.7 -52.6 -58.1 67 -99 SPO 1997 10 15 01 05 62 4.8 -9 679.70 -59.6 -52.4 -58.1 66 -99 SPO 1997 10 15 01 06 62 4.9 -9 679.70 -59.7 -52.2 -58.0 68 -99 SPO 1997 10 15 01 07 62 4.9 -9 679.70 -59.6 -52.2 -58.0 66 -99 SPO 1997 10 15 01 08 62 4.8 -9 679.70 -59.6 -52.0 -58.0 66 -99 SPO 1997 10 15 01 09 62 4.8 -9 679.70 -59.5 -52.0 -57.9 65 -99 SPO 1997 10 15 01 10 60 4.7 -9 679.70 -59.5 -51.9 -57.9 65 -99 SPO 1997 10 15 01 11 60 4.7 -9 679.70 -59.5 -51.7 -57.8 64 -99 SPO 1997 10 15 01 12 60 4.6 -9 679.70 -59.5 -51.5 -57.8 65 -99 SPO 1997 10 15 01 13 59 4.5 -9 679.70 -59.5 -51.6 -57.8 65 -99 SPO 1997 10 15 01 14 59 4.4 -9 679.70 -59.5 -51.8 -57.8 66 -99 SPO 1997 10 15 01 15 59 4.4 -9 679.70 -59.5 -51.9 -57.8 66 -99 SPO 1997 10 15 01 16 59 4.3 -9 679.70 -59.5 -52.2 -57.7 66 -99 SPO 1997 10 15 01 17 59 4.2 -9 679.80 -59.5 -52.3 -57.7 66 -99 SPO 1997 10 15 01 18 59 4.3 -9 679.80 -59.5 -52.3 -57.7 66 -99 SPO 1997 10 15 01 19 60 4.3 -9 679.80 -59.5 -52.4 -57.7 67 -99 SPO 1997 10 15 01 20 61 4.2 -9 679.80 -59.5 -52.6 -57.7 66 -99 SPO 1997 10 15 01 21 62 4.1 -9 679.80 -59.5 -52.6 -57.7 65 -99 SPO 1997 10 15 01 22 63 4.1 -9 679.80 -59.5 -52.8 -57.7 65 -99 SPO 1997 10 15 01 23 64 4.3 -9 679.80 -59.5 -52.9 -57.7 65 -99 SPO 1997 10 15 01 24 65 4.3 -9 679.80 -59.5 -53.1 -57.8 66 -99 SPO 1997 10 15 01 25 66 4.5 -9 679.80 -59.6 -53.3 -57.8 67 -99 SPO 1997 10 15 01 26 64 4.7 -9 679.80 -59.6 -53.4 -57.8 67 -99 SPO 1997 10 15 01 27 63 4.8 -9 679.80 -59.6 -53.4 -57.9 65 -99 SPO 1997 10 15 01 28 62 4.8 -9 679.80 -59.6 -53.5 -57.9 66 -99 SPO 1997 10 15 01 29 63 4.9 -9 679.80 -59.5 -53.8 -57.9 65 -99 SPO 1997 10 15 01 30 65 4.8 -9 679.80 -59.5 -54.0 -57.9 66 -99 SPO 1997 10 15 01 31 65 4.7 -9 679.80 -59.4 -54.2 -57.8 66 -99 SPO 1997 10 15 01 32 65 4.8 -9 679.80 -59.4 -54.3 -57.8 66 -99 SPO 1997 10 15 01 33 65 4.7 -9 679.80 -59.4 -54.2 -57.8 67 -99 SPO 1997 10 15 01 34 64 4.6 -9 679.80 -59.3 -54.2 -57.8 66 -99 SPO 1997 10 15 01 35 63 4.7 -9 679.80 -59.3 -54.2 -57.8 65 -99 SPO 1997 10 15 01 36 64 4.6 -9 679.80 -59.3 -54.1 -57.8 65 -99 SPO 1997 10 15 01 37 64 4.7 -9 679.80 -59.2 -54.0 -57.7 65 -99 SPO 1997 10 15 01 38 63 4.6 -9 679.70 -59.2 -53.7 -57.7 65 -99 SPO 1997 10 15 01 39 64 4.6 -9 679.70 -59.2 -53.5 -57.7 65 -99 SPO 1997 10 15 01 40 65 4.5 -9 679.70 -59.2 -53.4 -57.6 66 -99 SPO 1997 10 15 01 41 66 4.3 -9 679.70 -59.1 -53.4 -57.6 65 -99 SPO 1997 10 15 01 42 65 4.2 -9 679.70 -59.2 -53.5 -57.6 66 -99 SPO 1997 10 15 01 43 65 4.2 -9 679.70 -59.2 -53.6 -57.6 65 -99 SPO 1997 10 15 01 44 66 4.1 -9 679.70 -59.2 -54.0 -57.6 66 -99 SPO 1997 10 15 01 45 66 4.0 -9 679.70 -59.2 -54.3 -57.6 67 -99 SPO 1997 10 15 01 46 68 4.0 -9 679.70 -59.2 -54.4 -57.5 67 -99 SPO 1997 10 15 01 47 69 4.0 -9 679.70 -59.3 -54.4 -57.5 66 -99 SPO 1997 10 15 01 48 71 4.1 -9 679.70 -59.3 -54.4 -57.4 65 -99 SPO 1997 10 15 01 49 71 4.1 -9 679.70 -59.3 -54.4 -57.4 65 -99 SPO 1997 10 15 01 50 71 4.2 -9 679.70 -59.3 -54.3 -57.4 65 -99 SPO 1997 10 15 01 51 70 4.3 -9 679.70 -59.3 -54.2 -57.5 66 -99 SPO 1997 10 15 01 52 70 4.3 -9 679.70 -59.3 -54.1 -57.6 66 -99 SPO 1997 10 15 01 53 70 4.2 -9 679.70 -59.3 -54.0 -57.6 67 -99 SPO 1997 10 15 01 54 69 4.2 -9 679.70 -59.3 -53.9 -57.5 67 -99 SPO 1997 10 15 01 55 68 4.3 -9 679.70 -59.3 -53.9 -57.7 66 -99 SPO 1997 10 15 01 56 68 4.3 -9 679.70 -59.4 -53.8 -58.0 67 -99 SPO 1997 10 15 01 57 69 4.3 -9 679.70 -59.4 -53.8 -58.0 67 -99 SPO 1997 10 15 01 58 69 4.5 -9 679.60 -59.3 -53.6 -57.8 65 -99 SPO 1997 10 15 01 59 69 4.4 -9 679.60 -59.3 -53.7 -57.8 64 -99 SPO 1997 10 15 02 00 68 4.4 -9 679.70 -59.3 -53.6 -57.8 64 0 SPO 1997 10 15 02 01 68 4.4 -9 679.60 -59.3 -53.7 -57.8 65 -99 SPO 1997 10 15 02 02 68 4.3 -9 679.60 -59.3 -53.8 -57.8 65 -99 SPO 1997 10 15 02 03 68 4.3 -9 679.60 -59.3 -53.7 -57.8 66 -99 SPO 1997 10 15 02 04 68 4.4 -9 679.60 -59.4 -53.6 -57.8 68 -99 SPO 1997 10 15 02 05 67 4.6 -9 679.60 -59.3 -53.4 -57.8 67 -99 SPO 1997 10 15 02 06 67 4.8 -9 679.60 -59.3 -53.1 -57.9 67 -99 SPO 1997 10 15 02 07 65 4.9 -9 679.60 -59.3 -52.9 -57.9 67 -99 SPO 1997 10 15 02 08 65 5.0 -9 679.60 -59.3 -53.0 -58.0 67 -99 SPO 1997 10 15 02 09 65 5.0 -9 679.60 -59.2 -52.9 -57.9 67 -99 SPO 1997 10 15 02 10 65 5.0 -9 679.60 -59.2 -52.8 -57.9 67 -99 SPO 1997 10 15 02 11 64 5.0 -9 679.60 -59.2 -52.8 -57.9 67 -99 SPO 1997 10 15 02 12 64 5.1 -9 679.60 -59.1 -52.8 -57.8 66 -99 SPO 1997 10 15 02 13 63 5.1 -9 679.60 -59.1 -52.7 -57.8 65 -99 SPO 1997 10 15 02 14 63 5.2 -9 679.60 -59.1 -52.6 -57.8 65 -99 SPO 1997 10 15 02 15 63 5.1 -9 679.60 -59.0 -52.5 -57.7 65 -99 SPO 1997 10 15 02 16 63 5.2 -9 679.60 -59.0 -52.4 -57.7 65 -99 SPO 1997 10 15 02 17 62 5.2 -9 679.60 -59.0 -52.3 -57.6 65 -99 SPO 1997 10 15 02 18 62 5.2 -9 679.60 -59.0 -52.2 -57.6 66 -99 SPO 1997 10 15 02 19 61 5.0 -9 679.60 -59.0 -52.1 -57.6 67 -99 SPO 1997 10 15 02 20 60 5.0 -9 679.60 -58.9 -52.0 -57.5 66 -99 SPO 1997 10 15 02 21 61 5.0 -9 679.60 -58.9 -51.9 -57.5 66 -99 SPO 1997 10 15 02 22 60 5.0 -9 679.60 -58.8 -51.8 -57.4 66 -99 SPO 1997 10 15 02 23 59 5.1 -9 679.60 -58.8 -51.7 -57.4 65 -99 SPO 1997 10 15 02 24 59 5.2 -9 679.60 -58.8 -51.6 -57.4 65 -99 SPO 1997 10 15 02 25 58 5.4 -9 679.60 -58.8 -51.4 -57.4 66 -99 SPO 1997 10 15 02 26 58 5.4 -9 679.60 -58.7 -51.2 -57.3 65 -99 SPO 1997 10 15 02 27 58 5.3 -9 679.60 -58.7 -51.2 -57.3 65 -99 SPO 1997 10 15 02 28 58 5.2 -9 679.60 -58.7 -51.2 -57.3 66 -99 SPO 1997 10 15 02 29 56 5.4 -9 679.60 -58.6 -51.0 -57.2 66 -99 SPO 1997 10 15 02 30 55 5.4 -9 679.60 -58.6 -50.8 -57.2 66 -99 SPO 1997 10 15 02 31 54 5.2 -9 679.60 -58.6 -50.6 -57.1 66 -99 SPO 1997 10 15 02 32 54 5.2 -9 679.60 -58.6 -50.5 -57.1 66 -99 SPO 1997 10 15 02 33 54 5.2 -9 679.60 -58.5 -50.4 -57.1 66 -99 SPO 1997 10 15 02 34 54 5.2 -9 679.60 -58.5 -50.3 -57.1 66 -99 SPO 1997 10 15 02 35 53 5.3 -9 679.60 -58.5 -50.2 -57.1 66 -99 SPO 1997 10 15 02 36 52 5.3 -9 679.50 -58.6 -50.2 -57.1 66 -99 SPO 1997 10 15 02 37 53 5.2 -9 679.60 -58.5 -50.1 -57.1 66 -99 SPO 1997 10 15 02 38 53 5.2 -9 679.60 -58.5 -50.0 -57.0 66 -99 SPO 1997 10 15 02 39 54 5.2 -9 679.60 -58.5 -50.1 -57.1 66 -99 SPO 1997 10 15 02 40 55 5.2 -9 679.60 -58.5 -50.1 -57.0 66 -99 SPO 1997 10 15 02 41 55 5.1 -9 679.60 -58.5 -50.2 -57.0 67 -99 SPO 1997 10 15 02 42 55 5.2 -9 679.60 -58.5 -50.2 -57.0 67 -99 SPO 1997 10 15 02 43 55 5.2 -9 679.60 -58.5 -50.2 -57.1 67 -99 SPO 1997 10 15 02 44 56 5.3 -9 679.60 -58.5 -50.3 -57.1 67 -99 SPO 1997 10 15 02 45 56 5.2 -9 679.60 -58.5 -50.5 -57.1 67 -99 SPO 1997 10 15 02 46 56 5.2 -9 679.60 -58.5 -50.6 -57.1 66 -99 SPO 1997 10 15 02 47 57 5.2 -9 679.60 -58.5 -50.7 -57.1 66 -99 SPO 1997 10 15 02 48 55 5.3 -9 679.60 -58.5 -50.7 -57.1 65 -99 SPO 1997 10 15 02 49 54 5.4 -9 679.50 -58.4 -50.6 -57.1 64 -99 SPO 1997 10 15 02 50 53 5.5 -9 679.50 -58.4 -50.6 -57.1 64 -99 SPO 1997 10 15 02 51 52 5.8 -9 679.50 -58.4 -50.4 -57.1 66 -99 SPO 1997 10 15 02 52 51 6.0 -9 679.50 -58.4 -50.2 -57.1 66 -99 SPO 1997 10 15 02 53 49 6.2 -9 679.60 -58.3 -50.0 -57.1 66 -99 SPO 1997 10 15 02 54 49 6.1 -9 679.60 -58.2 -50.0 -57.0 66 -99 SPO 1997 10 15 02 55 48 6.0 -9 679.60 -58.2 -49.8 -57.0 67 -99 SPO 1997 10 15 02 56 48 5.8 -9 679.60 -58.2 -49.8 -57.0 67 -99 SPO 1997 10 15 02 57 49 5.6 -9 679.60 -58.1 -49.7 -56.9 66 -99 SPO 1997 10 15 02 58 49 5.5 -9 679.60 -58.1 -49.7 -56.8 66 -99 SPO 1997 10 15 02 59 49 5.4 -9 679.60 -58.1 -49.7 -56.8 66 -99 SPO 1997 10 15 03 00 50 5.3 -9 679.60 -58.0 -49.7 -56.7 65 0 SPO 1997 10 15 03 01 50 5.3 -9 679.60 -58.1 -49.7 -56.7 66 -99 SPO 1997 10 15 03 02 51 5.1 -9 679.60 -58.1 -49.7 -56.7 66 -99 SPO 1997 10 15 03 03 51 5.1 -9 679.60 -58.1 -49.8 -56.7 66 -99 SPO 1997 10 15 03 04 52 5.0 -9 679.60 -58.2 -49.8 -56.7 67 -99 SPO 1997 10 15 03 05 53 5.1 -9 679.60 -58.2 -49.8 -56.7 67 -99 SPO 1997 10 15 03 06 54 5.0 -9 679.60 -58.2 -49.8 -56.8 67 -99 SPO 1997 10 15 03 07 55 5.1 -9 679.60 -58.3 -50.0 -56.8 68 -99 SPO 1997 10 15 03 08 55 5.1 -9 679.60 -58.3 -50.0 -56.8 68 -99 SPO 1997 10 15 03 09 57 5.1 -9 679.60 -58.4 -50.0 -56.9 69 -99 SPO 1997 10 15 03 10 57 5.1 -9 679.60 -58.4 -50.1 -56.9 68 -99 SPO 1997 10 15 03 11 58 5.2 -9 679.60 -58.4 -50.0 -56.9 66 -99 SPO 1997 10 15 03 12 59 5.1 -9 679.60 -58.4 -50.2 -57.0 66 -99 SPO 1997 10 15 03 13 59 5.3 -9 679.60 -58.5 -50.4 -57.0 66 -99 SPO 1997 10 15 03 14 60 5.3 -9 679.60 -58.5 -50.5 -57.0 66 -99 SPO 1997 10 15 03 15 60 5.2 -9 679.60 -58.5 -50.5 -57.0 66 -99 SPO 1997 10 15 03 16 61 5.2 -9 679.60 -58.5 -50.9 -57.0 66 -99 SPO 1997 10 15 03 17 60 5.3 -9 679.60 -58.5 -51.0 -57.0 66 -99 SPO 1997 10 15 03 18 59 5.5 -9 679.60 -58.5 -50.8 -57.1 66 -99 SPO 1997 10 15 03 19 60 5.5 -9 679.60 -58.5 -51.0 -57.1 66 -99 SPO 1997 10 15 03 20 61 5.4 -9 679.60 -58.5 -51.2 -57.1 66 -99 SPO 1997 10 15 03 21 62 5.4 -9 679.60 -58.5 -51.5 -57.1 66 -99 SPO 1997 10 15 03 22 62 5.4 -9 679.60 -58.5 -51.6 -57.1 66 -99 SPO 1997 10 15 03 23 62 5.4 -9 679.60 -58.5 -51.6 -57.1 65 -99 SPO 1997 10 15 03 24 62 5.4 -9 679.60 -58.5 -51.5 -57.1 65 -99 SPO 1997 10 15 03 25 61 5.3 -9 679.60 -58.5 -51.5 -57.1 65 -99 SPO 1997 10 15 03 26 60 5.4 -9 679.60 -58.4 -51.6 -57.1 64 -99 SPO 1997 10 15 03 27 60 5.5 -9 679.60 -58.4 -51.5 -57.1 64 -99 SPO 1997 10 15 03 28 59 5.6 -9 679.60 -58.5 -51.4 -57.1 66 -99 SPO 1997 10 15 03 29 58 5.5 -9 679.60 -58.4 -51.5 -57.1 65 -99 SPO 1997 10 15 03 30 58 5.5 -9 679.60 -58.4 -51.5 -57.1 66 -99 SPO 1997 10 15 03 31 58 5.5 -9 679.60 -58.4 -51.5 -57.1 66 -99 SPO 1997 10 15 03 32 58 5.5 -9 679.60 -58.4 -51.5 -57.1 66 -99 SPO 1997 10 15 03 33 59 5.4 -9 679.60 -58.4 -51.6 -57.1 66 -99 SPO 1997 10 15 03 34 58 5.5 -9 679.60 -58.4 -51.8 -57.1 66 -99 SPO 1997 10 15 03 35 57 5.3 -9 679.60 -58.4 -51.9 -57.1 64 -99 SPO 1997 10 15 03 36 58 5.3 -9 679.60 -58.5 -52.0 -57.1 65 -99 SPO 1997 10 15 03 37 58 5.2 -9 679.60 -58.4 -52.1 -57.1 64 -99 SPO 1997 10 15 03 38 59 5.0 -9 679.60 -58.4 -52.1 -57.0 65 -99 SPO 1997 10 15 03 39 59 5.0 -9 679.70 -58.4 -52.0 -57.0 65 -99 SPO 1997 10 15 03 40 59 5.0 -9 679.60 -58.4 -51.8 -57.0 66 -99 SPO 1997 10 15 03 41 60 5.1 -9 679.60 -58.4 -52.0 -57.0 66 -99 SPO 1997 10 15 03 42 61 5.1 -9 679.60 -58.4 -52.0 -57.0 66 -99 SPO 1997 10 15 03 43 61 5.0 -9 679.70 -58.4 -52.1 -57.0 66 -99 SPO 1997 10 15 03 44 60 5.0 -9 679.70 -58.4 -52.1 -57.0 66 -99 SPO 1997 10 15 03 45 60 5.0 -9 679.70 -58.4 -51.9 -57.0 66 -99 SPO 1997 10 15 03 46 60 4.9 -9 679.70 -58.4 -51.9 -56.9 66 -99 SPO 1997 10 15 03 47 60 5.1 -9 679.60 -58.4 -51.8 -56.9 65 -99 SPO 1997 10 15 03 48 60 5.1 -9 679.60 -58.4 -51.8 -57.0 65 -99 SPO 1997 10 15 03 49 60 5.1 -9 679.70 -58.4 -51.7 -57.0 65 -99 SPO 1997 10 15 03 50 60 5.0 -9 679.70 -58.5 -51.8 -57.0 66 -99 SPO 1997 10 15 03 51 59 5.1 -9 679.70 -58.5 -51.9 -57.0 66 -99 SPO 1997 10 15 03 52 57 5.3 -9 679.70 -58.5 -51.8 -57.0 67 -99 SPO 1997 10 15 03 53 56 5.4 -9 679.60 -58.5 -51.6 -57.0 67 -99 SPO 1997 10 15 03 54 55 5.4 -9 679.60 -58.5 -51.4 -57.0 67 -99 SPO 1997 10 15 03 55 55 5.3 -9 679.60 -58.4 -51.2 -57.0 66 -99 SPO 1997 10 15 03 56 56 5.3 -9 679.60 -58.4 -51.0 -57.0 66 -99 SPO 1997 10 15 03 57 56 5.1 -9 679.60 -58.4 -51.0 -57.0 66 -99 SPO 1997 10 15 03 58 55 5.0 -9 679.60 -58.4 -51.1 -57.0 66 -99 SPO 1997 10 15 03 59 56 5.0 -9 679.60 -58.4 -51.2 -57.0 66 -99 SPO 1997 10 15 04 00 57 5.0 -9 679.70 -58.5 -51.3 -57.0 66 0 SPO 1997 10 15 04 01 58 4.9 -9 679.70 -58.4 -51.4 -57.0 66 -99 SPO 1997 10 15 04 02 58 5.0 -9 679.70 -58.4 -51.4 -57.0 66 -99 SPO 1997 10 15 04 03 59 5.0 -9 679.60 -58.4 -51.4 -57.0 66 -99 SPO 1997 10 15 04 04 60 5.2 -9 679.60 -58.5 -51.5 -57.0 67 -99 SPO 1997 10 15 04 05 61 5.2 -9 679.60 -58.5 -51.6 -57.1 69 -99 SPO 1997 10 15 04 06 61 5.2 -9 679.60 -58.5 -51.9 -57.2 69 -99 SPO 1997 10 15 04 07 62 5.1 -9 679.70 -58.6 -52.3 -57.2 70 -99 SPO 1997 10 15 04 08 64 4.9 -9 679.70 -58.5 -52.5 -57.2 69 -99 SPO 1997 10 15 04 09 65 4.8 -9 679.70 -58.5 -52.8 -57.2 67 -99 SPO 1997 10 15 04 10 66 4.7 -9 679.70 -58.6 -53.1 -57.2 67 -99 SPO 1997 10 15 04 11 66 4.6 -9 679.70 -58.6 -53.4 -57.2 67 -99 SPO 1997 10 15 04 12 66 4.6 -9 679.80 -58.7 -53.6 -57.2 67 -99 SPO 1997 10 15 04 13 68 4.8 -9 679.70 -58.6 -53.8 -57.2 66 -99 SPO 1997 10 15 04 14 67 4.9 -9 679.70 -58.6 -53.9 -57.3 66 -99 SPO 1997 10 15 04 15 66 5.0 -9 679.70 -58.7 -53.8 -57.4 67 -99 SPO 1997 10 15 04 16 66 5.0 -9 679.70 -58.7 -53.6 -57.4 67 -99 SPO 1997 10 15 04 17 66 4.9 -9 679.70 -58.7 -53.7 -57.4 67 -99 SPO 1997 10 15 04 18 67 4.9 -9 679.70 -58.8 -53.6 -57.4 67 -99 SPO 1997 10 15 04 19 66 4.7 -9 679.70 -58.8 -54.0 -57.4 67 -99 SPO 1997 10 15 04 20 64 4.8 -9 679.70 -58.8 -54.2 -57.4 66 -99 SPO 1997 10 15 04 21 63 4.9 -9 679.70 -58.8 -53.9 -57.4 66 -99 SPO 1997 10 15 04 22 62 4.8 -9 679.70 -58.8 -53.6 -57.5 65 -99 SPO 1997 10 15 04 23 61 4.8 -9 679.60 -58.8 -53.2 -57.5 65 -99 SPO 1997 10 15 04 24 59 4.8 -9 679.60 -58.9 -52.9 -57.5 66 -99 SPO 1997 10 15 04 25 58 4.8 -9 679.60 -58.8 -52.6 -57.5 65 -99 SPO 1997 10 15 04 26 58 4.8 -9 679.60 -58.8 -52.2 -57.5 65 -99 SPO 1997 10 15 04 27 57 4.7 -9 679.60 -58.8 -51.9 -57.5 66 -99 SPO 1997 10 15 04 28 57 4.9 -9 679.60 -58.8 -51.6 -57.5 66 -99 SPO 1997 10 15 04 29 55 4.9 -9 679.60 -58.8 -51.2 -57.5 66 -99 SPO 1997 10 15 04 30 54 4.8 -9 679.60 -58.7 -50.8 -57.4 66 -99 SPO 1997 10 15 04 31 54 4.8 -9 679.60 -58.7 -50.7 -57.4 66 -99 SPO 1997 10 15 04 32 53 4.8 -9 679.60 -58.6 -50.6 -57.4 66 -99 SPO 1997 10 15 04 33 51 4.7 -9 679.60 -58.6 -50.5 -57.3 66 -99 SPO 1997 10 15 04 34 49 4.6 -9 679.60 -58.6 -50.2 -57.3 65 -99 SPO 1997 10 15 04 35 48 4.6 -9 679.60 -58.5 -50.1 -57.3 64 -99 SPO 1997 10 15 04 36 48 4.7 -9 679.60 -58.4 -50.1 -57.3 63 -99 SPO 1997 10 15 04 37 47 4.6 -9 679.60 -58.4 -50.1 -57.3 64 -99 SPO 1997 10 15 04 38 46 4.5 -9 679.60 -58.3 -50.1 -57.3 64 -99 SPO 1997 10 15 04 39 46 4.5 -9 679.60 -58.3 -50.1 -57.2 65 -99 SPO 1997 10 15 04 40 46 4.5 -9 679.60 -58.3 -50.0 -57.2 66 -99 SPO 1997 10 15 04 41 47 4.4 -9 679.60 -58.3 -49.9 -57.3 67 -99 SPO 1997 10 15 04 42 49 4.3 -9 679.60 -58.2 -49.8 -57.2 66 -99 SPO 1997 10 15 04 43 50 4.5 -9 679.60 -58.2 -49.8 -57.2 67 -99 SPO 1997 10 15 04 44 51 4.4 -9 679.60 -58.3 -49.8 -57.3 68 -99 SPO 1997 10 15 04 45 52 4.4 -9 679.60 -58.4 -49.9 -57.3 69 -99 SPO 1997 10 15 04 46 53 4.3 -9 679.60 -58.4 -49.9 -57.4 68 -99 SPO 1997 10 15 04 47 53 4.4 -9 679.60 -58.4 -49.9 -57.4 66 -99 SPO 1997 10 15 04 48 53 4.4 -9 679.60 -58.4 -50.0 -57.4 66 -99 SPO 1997 10 15 04 49 53 4.3 -9 679.60 -58.4 -50.1 -57.5 66 -99 SPO 1997 10 15 04 50 53 4.4 -9 679.60 -58.5 -50.4 -57.5 66 -99 SPO 1997 10 15 04 51 54 4.3 -9 679.60 -58.5 -50.8 -57.5 66 -99 SPO 1997 10 15 04 52 55 4.1 -9 679.60 -58.6 -51.2 -57.6 67 -99 SPO 1997 10 15 04 53 54 4.2 -9 679.60 -58.6 -51.2 -57.6 67 -99 SPO 1997 10 15 04 54 54 4.0 -9 679.60 -58.6 -51.0 -57.6 67 -99 SPO 1997 10 15 04 55 52 4.3 -9 679.60 -58.6 -51.1 -57.6 67 -99 SPO 1997 10 15 04 56 51 4.2 -9 679.60 -58.6 -51.2 -57.6 67 -99 SPO 1997 10 15 04 57 51 4.0 -9 679.60 -58.6 -51.4 -57.6 67 -99 SPO 1997 10 15 04 58 52 4.0 -9 679.50 -58.6 -51.7 -57.6 66 -99 SPO 1997 10 15 04 59 52 4.2 -9 679.60 -58.6 -51.6 -57.6 66 -99 SPO 1997 10 15 05 00 53 4.1 -9 679.60 -58.6 -51.4 -57.6 66 0 SPO 1997 10 15 05 01 53 4.2 -9 679.60 -58.6 -51.3 -57.6 66 -99 SPO 1997 10 15 05 02 55 4.4 -9 679.50 -58.6 -51.4 -57.6 66 -99 SPO 1997 10 15 05 03 56 4.4 -9 679.50 -58.6 -51.1 -57.7 66 -99 SPO 1997 10 15 05 04 55 4.2 -9 679.50 -58.6 -51.4 -57.7 66 -99 SPO 1997 10 15 05 05 54 4.3 -9 679.50 -58.6 -51.7 -57.7 66 -99 SPO 1997 10 15 05 06 52 4.2 -9 679.50 -58.6 -52.0 -57.7 66 -99 SPO 1997 10 15 05 07 52 4.4 -9 679.50 -58.6 -52.2 -57.7 66 -99 SPO 1997 10 15 05 08 52 4.2 -9 679.50 -58.6 -52.4 -57.6 66 -99 SPO 1997 10 15 05 09 52 4.1 -9 679.50 -58.6 -52.7 -57.6 66 -99 SPO 1997 10 15 05 10 52 4.0 -9 679.50 -58.6 -52.8 -57.6 66 -99 SPO 1997 10 15 05 11 53 3.9 -9 679.50 -58.6 -52.7 -57.6 66 -99 SPO 1997 10 15 05 12 53 4.0 -9 679.60 -58.6 -52.4 -57.6 66 -99 SPO 1997 10 15 05 13 57 3.7 -9 679.60 -58.6 -52.5 -57.6 66 -99 SPO 1997 10 15 05 14 59 3.5 -9 679.60 -58.6 -52.9 -57.6 66 -99 SPO 1997 10 15 05 15 60 3.6 -9 679.60 -58.7 -53.2 -57.6 67 -99 SPO 1997 10 15 05 16 59 3.9 -9 679.60 -58.8 -53.7 -57.7 67 -99 SPO 1997 10 15 05 17 58 4.0 -9 679.60 -58.8 -53.7 -57.8 66 -99 SPO 1997 10 15 05 18 59 4.2 -9 679.60 -58.8 -53.0 -57.8 67 -99 SPO 1997 10 15 05 19 59 4.2 -9 679.50 -58.9 -52.7 -57.9 67 -99 SPO 1997 10 15 05 20 58 4.2 -9 679.60 -58.9 -52.8 -57.9 66 -99 SPO 1997 10 15 05 21 59 4.0 -9 679.60 -59.0 -53.1 -57.9 67 -99 SPO 1997 10 15 05 22 60 3.9 -9 679.60 -59.0 -53.7 -57.9 67 -99 SPO 1997 10 15 05 23 61 4.0 -9 679.60 -59.0 -54.1 -58.0 66 -99 SPO 1997 10 15 05 24 61 4.0 -9 679.60 -59.0 -54.4 -58.0 66 -99 SPO 1997 10 15 05 25 62 4.0 -9 679.60 -59.1 -54.3 -58.0 66 -99 SPO 1997 10 15 05 26 62 4.0 -9 679.60 -59.1 -54.4 -58.1 66 -99 SPO 1997 10 15 05 27 63 4.1 -9 679.60 -59.1 -54.6 -58.1 65 -99 SPO 1997 10 15 05 28 62 4.2 -9 679.60 -59.1 -54.5 -58.1 66 -99 SPO 1997 10 15 05 29 61 4.4 -9 679.50 -59.2 -54.4 -58.2 67 -99 SPO 1997 10 15 05 30 61 4.5 -9 679.50 -59.2 -54.2 -58.2 66 -99 SPO 1997 10 15 05 31 61 4.4 -9 679.50 -59.2 -54.1 -58.3 66 -99 SPO 1997 10 15 05 32 60 4.6 -9 679.50 -59.2 -54.0 -58.3 66 -99 SPO 1997 10 15 05 33 58 4.7 -9 679.50 -59.1 -53.8 -58.2 65 -99 SPO 1997 10 15 05 34 57 4.9 -9 679.40 -59.0 -53.5 -58.2 65 -99 SPO 1997 10 15 05 35 57 4.8 -9 679.40 -59.0 -53.1 -58.2 65 -99 SPO 1997 10 15 05 36 57 4.8 -9 679.40 -59.0 -52.9 -58.2 65 -99 SPO 1997 10 15 05 37 58 4.8 -9 679.40 -59.0 -53.0 -58.2 65 -99 SPO 1997 10 15 05 38 57 4.9 -9 679.40 -59.0 -53.0 -58.2 64 -99 SPO 1997 10 15 05 39 56 5.0 -9 679.40 -59.0 -52.8 -58.2 64 -99 SPO 1997 10 15 05 40 57 5.1 -9 679.40 -58.9 -52.6 -58.2 63 -99 SPO 1997 10 15 05 41 59 5.1 -9 679.40 -58.9 -52.5 -58.2 64 -99 SPO 1997 10 15 05 42 60 5.0 -9 679.40 -59.0 -52.8 -58.2 65 -99 SPO 1997 10 15 05 43 61 4.9 -9 679.40 -59.0 -53.3 -58.3 65 -99 SPO 1997 10 15 05 44 63 4.8 -9 679.50 -59.0 -53.8 -58.3 65 -99 SPO 1997 10 15 05 45 65 4.8 -9 679.40 -59.0 -54.1 -58.2 66 -99 SPO 1997 10 15 05 46 66 4.9 -9 679.40 -59.0 -54.2 -58.3 66 -99 SPO 1997 10 15 05 47 66 4.9 -9 679.50 -59.0 -54.4 -58.3 66 -99 SPO 1997 10 15 05 48 68 4.8 -9 679.50 -59.0 -54.4 -58.4 66 -99 SPO 1997 10 15 05 49 70 4.8 -9 679.50 -59.0 -54.7 -58.4 65 -99 SPO 1997 10 15 05 50 70 4.8 -9 679.50 -59.1 -54.7 -58.4 66 -99 SPO 1997 10 15 05 51 69 5.0 -9 679.50 -59.1 -54.6 -58.4 65 -99 SPO 1997 10 15 05 52 69 5.2 -9 679.50 -59.1 -54.6 -58.4 65 -99 SPO 1997 10 15 05 53 68 5.3 -9 679.50 -59.1 -54.7 -58.4 65 -99 SPO 1997 10 15 05 54 69 5.3 -9 679.50 -59.1 -54.7 -58.4 65 -99 SPO 1997 10 15 05 55 69 5.3 -9 679.40 -59.0 -54.9 -58.4 64 -99 SPO 1997 10 15 05 56 67 5.3 -9 679.40 -59.1 -55.2 -58.4 65 -99 SPO 1997 10 15 05 57 67 5.3 -9 679.40 -59.0 -55.3 -58.4 65 -99 SPO 1997 10 15 05 58 67 5.3 -9 679.40 -59.0 -55.3 -58.3 65 -99 SPO 1997 10 15 05 59 66 5.2 -9 679.50 -59.1 -55.3 -58.3 65 -99 SPO 1997 10 15 06 00 66 5.0 -9 679.50 -59.1 -55.2 -58.3 65 0 SPO 1997 10 15 06 01 66 5.1 -9 679.50 -59.1 -55.2 -58.3 65 -99 SPO 1997 10 15 06 02 66 5.2 -9 679.50 -59.1 -55.1 -58.2 65 -99 SPO 1997 10 15 06 03 67 5.2 -9 679.50 -59.1 -55.1 -58.2 65 -99 SPO 1997 10 15 06 04 67 5.0 -9 679.50 -59.1 -55.3 -58.3 65 -99 SPO 1997 10 15 06 05 67 5.1 -9 679.50 -59.1 -55.4 -58.2 65 -99 SPO 1997 10 15 06 06 66 5.3 -9 679.50 -59.1 -55.0 -58.2 65 -99 SPO 1997 10 15 06 07 65 5.2 -9 679.50 -59.1 -54.8 -58.2 65 -99 SPO 1997 10 15 06 08 63 5.3 -9 679.50 -59.1 -54.4 -58.2 65 -99 SPO 1997 10 15 06 09 63 5.2 -9 679.50 -59.1 -54.2 -58.1 65 -99 SPO 1997 10 15 06 10 63 5.2 -9 679.50 -59.1 -54.0 -58.1 65 -99 SPO 1997 10 15 06 11 62 4.9 -9 679.50 -59.1 -54.2 -58.1 65 -99 SPO 1997 10 15 06 12 63 4.9 -9 679.50 -59.1 -54.2 -58.0 65 -99 SPO 1997 10 15 06 13 62 4.9 -9 679.50 -59.1 -53.8 -58.0 65 -99 SPO 1997 10 15 06 14 60 5.0 -9 679.50 -59.1 -53.4 -57.9 65 -99 SPO 1997 10 15 06 15 59 4.9 -9 679.50 -59.1 -53.0 -57.9 64 -99 SPO 1997 10 15 06 16 59 4.8 -9 679.50 -59.1 -52.9 -57.8 64 -99 SPO 1997 10 15 06 17 61 4.8 -9 679.50 -59.0 -52.9 -57.8 63 -99 SPO 1997 10 15 06 18 61 4.8 -9 679.50 -59.0 -53.0 -57.8 64 -99 SPO 1997 10 15 06 19 61 4.7 -9 679.50 -59.0 -53.0 -57.8 65 -99 SPO 1997 10 15 06 20 61 4.7 -9 679.50 -59.1 -53.1 -57.8 65 -99 SPO 1997 10 15 06 21 62 4.8 -9 679.50 -59.1 -53.1 -57.8 65 -99 SPO 1997 10 15 06 22 63 4.8 -9 679.40 -59.1 -53.0 -57.8 65 -99 SPO 1997 10 15 06 23 63 4.8 -9 679.40 -59.1 -53.1 -57.9 65 -99 SPO 1997 10 15 06 24 62 4.9 -9 679.40 -59.1 -53.0 -57.9 65 -99 SPO 1997 10 15 06 25 63 4.9 -9 679.40 -59.1 -53.0 -57.9 65 -99 SPO 1997 10 15 06 26 62 4.9 -9 679.40 -59.1 -52.8 -57.9 65 -99 SPO 1997 10 15 06 27 62 4.9 -9 679.40 -59.1 -52.5 -57.9 64 -99 SPO 1997 10 15 06 28 62 4.9 -9 679.40 -59.1 -52.4 -57.9 63 -99 SPO 1997 10 15 06 29 60 5.0 -9 679.40 -59.1 -52.4 -57.8 64 -99 SPO 1997 10 15 06 30 60 5.1 -9 679.40 -59.1 -52.2 -57.8 65 -99 SPO 1997 10 15 06 31 59 5.1 -9 679.40 -59.1 -52.0 -57.8 65 -99 SPO 1997 10 15 06 32 59 5.1 -9 679.40 -59.1 -51.8 -57.8 65 -99 SPO 1997 10 15 06 33 58 5.1 -9 679.40 -59.1 -52.0 -57.8 65 -99 SPO 1997 10 15 06 34 60 5.0 -9 679.40 -59.0 -52.2 -57.8 65 -99 SPO 1997 10 15 06 35 59 4.9 -9 679.50 -59.0 -52.5 -57.8 65 -99 SPO 1997 10 15 06 36 59 4.9 -9 679.40 -59.0 -52.3 -57.8 65 -99 SPO 1997 10 15 06 37 58 4.9 -9 679.40 -59.0 -52.4 -57.8 66 -99 SPO 1997 10 15 06 38 59 4.9 -9 679.40 -58.9 -52.6 -57.8 65 -99 SPO 1997 10 15 06 39 59 4.8 -9 679.40 -58.9 -52.4 -57.8 65 -99 SPO 1997 10 15 06 40 61 4.7 -9 679.50 -59.0 -52.3 -57.8 65 -99 SPO 1997 10 15 06 41 62 4.5 -9 679.50 -59.0 -52.3 -57.7 65 -99 SPO 1997 10 15 06 42 62 4.5 -9 679.50 -59.0 -52.4 -57.7 64 -99 SPO 1997 10 15 06 43 62 4.6 -9 679.50 -59.0 -52.6 -57.7 64 -99 SPO 1997 10 15 06 44 61 4.7 -9 679.50 -59.0 -52.7 -57.7 64 -99 SPO 1997 10 15 06 45 60 4.9 -9 679.50 -58.9 -52.4 -57.7 64 -99 SPO 1997 10 15 06 46 61 4.8 -9 679.50 -58.9 -51.7 -57.7 65 -99 SPO 1997 10 15 06 47 60 4.6 -9 679.50 -58.9 -52.1 -57.7 65 -99 SPO 1997 10 15 06 48 59 4.6 -9 679.50 -59.0 -52.5 -57.6 66 -99 SPO 1997 10 15 06 49 59 4.6 -9 679.40 -58.9 -52.4 -57.6 65 -99 SPO 1997 10 15 06 50 59 4.6 -9 679.40 -58.9 -52.2 -57.6 65 -99 SPO 1997 10 15 06 51 59 4.5 -9 679.40 -59.0 -52.4 -57.6 65 -99 SPO 1997 10 15 06 52 59 4.5 -9 679.50 -59.0 -52.4 -57.6 65 -99 SPO 1997 10 15 06 53 59 4.9 -9 679.50 -59.0 -51.9 -57.6 65 -99 SPO 1997 10 15 06 54 61 4.5 -9 679.50 -58.9 -51.6 -57.6 64 -99 SPO 1997 10 15 06 55 62 4.4 -9 679.50 -59.0 -51.9 -57.6 65 -99 SPO 1997 10 15 06 56 60 4.4 -9 679.50 -59.0 -52.0 -57.6 65 -99 SPO 1997 10 15 06 57 60 4.0 -9 679.50 -59.1 -52.5 -57.6 67 -99 SPO 1997 10 15 06 58 62 4.4 -9 679.50 -59.0 -52.2 -57.6 66 -99 SPO 1997 10 15 06 59 63 4.1 -9 679.50 -58.9 -52.4 -57.6 65 -99 SPO 1997 10 15 07 00 62 4.2 -9 679.50 -59.0 -52.8 -57.6 65 0 SPO 1997 10 15 07 01 61 4.0 -9 679.50 -59.0 -53.1 -57.6 65 -99 SPO 1997 10 15 07 02 64 4.0 -9 679.50 -59.0 -53.1 -57.6 65 -99 SPO 1997 10 15 07 03 62 3.4 -9 679.50 -59.0 -53.4 -57.5 65 -99 SPO 1997 10 15 07 04 61 3.5 -9 679.50 -59.1 -54.2 -57.5 66 -99 SPO 1997 10 15 07 05 58 2.9 -9 679.50 -59.2 -54.8 -57.5 66 -99 SPO 1997 10 15 07 06 60 2.9 -9 679.50 -59.2 -55.8 -57.4 66 -99 SPO 1997 10 15 07 07 61 3.7 -9 679.50 -59.2 -54.7 -57.4 66 -99 SPO 1997 10 15 07 08 60 3.6 -9 679.50 -59.2 -54.6 -57.4 66 -99 SPO 1997 10 15 07 09 58 3.7 -9 679.50 -59.2 -54.8 -57.4 67 -99 SPO 1997 10 15 07 10 57 3.6 -9 679.50 -59.2 -54.4 -57.4 67 -99 SPO 1997 10 15 07 11 58 3.9 -9 679.50 -59.2 -54.4 -57.4 67 -99 SPO 1997 10 15 07 12 58 4.2 -9 679.40 -59.1 -53.6 -57.5 67 -99 SPO 1997 10 15 07 13 59 4.0 -9 679.40 -59.0 -53.4 -57.5 66 -99 SPO 1997 10 15 07 14 57 3.9 -9 679.40 -59.1 -54.0 -57.4 67 -99 SPO 1997 10 15 07 15 57 3.9 -9 679.40 -59.1 -53.8 -57.4 67 -99 SPO 1997 10 15 07 16 57 4.0 -9 679.40 -59.0 -53.4 -57.4 65 -99 SPO 1997 10 15 07 17 57 4.0 -9 679.40 -59.0 -53.6 -57.4 65 -99 SPO 1997 10 15 07 18 58 4.0 -9 679.40 -58.9 -53.4 -57.4 65 -99 SPO 1997 10 15 07 19 59 4.0 -9 679.40 -58.9 -53.3 -57.3 65 -99 SPO 1997 10 15 07 20 61 4.0 -9 679.40 -58.9 -53.3 -57.4 65 -99 SPO 1997 10 15 07 21 59 4.0 -9 679.40 -58.9 -53.4 -57.4 66 -99 SPO 1997 10 15 07 22 59 3.8 -9 679.40 -58.8 -53.5 -57.4 65 -99 SPO 1997 10 15 07 23 60 3.8 -9 679.40 -58.9 -54.0 -57.3 67 -99 SPO 1997 10 15 07 24 61 3.8 -9 679.40 -58.9 -54.1 -57.4 66 -99 SPO 1997 10 15 07 25 64 3.7 -9 679.40 -58.9 -54.0 -57.3 66 -99 SPO 1997 10 15 07 26 65 3.7 -9 679.50 -58.8 -54.2 -57.2 65 -99 SPO 1997 10 15 07 27 65 3.5 -9 679.40 -58.8 -54.7 -57.2 65 -99 SPO 1997 10 15 07 28 63 3.8 -9 679.40 -58.8 -54.8 -57.2 65 -99 SPO 1997 10 15 07 29 63 3.9 -9 679.40 -58.8 -54.5 -57.2 65 -99 SPO 1997 10 15 07 30 62 4.0 -9 679.40 -58.9 -54.2 -57.2 65 -99 SPO 1997 10 15 07 31 62 4.3 -9 679.40 -58.8 -53.7 -57.3 65 -99 SPO 1997 10 15 07 32 60 4.3 -9 679.40 -58.8 -53.5 -57.3 65 -99 SPO 1997 10 15 07 33 59 4.3 -9 679.40 -58.9 -53.6 -57.3 66 -99 SPO 1997 10 15 07 34 59 4.2 -9 679.40 -58.8 -53.9 -57.3 65 -99 SPO 1997 10 15 07 35 57 4.3 -9 679.40 -58.9 -54.0 -57.4 66 -99 SPO 1997 10 15 07 36 57 4.7 -9 679.40 -58.8 -53.6 -57.4 66 -99 SPO 1997 10 15 07 37 56 4.8 -9 679.40 -58.8 -53.2 -57.4 66 -99 SPO 1997 10 15 07 38 56 4.8 -9 679.30 -58.8 -52.9 -57.4 66 -99 SPO 1997 10 15 07 39 55 5.0 -9 679.30 -58.9 -52.7 -57.5 68 -99 SPO 1997 10 15 07 40 55 5.0 -9 679.30 -58.8 -52.6 -57.5 66 -99 SPO 1997 10 15 07 41 55 5.0 -9 679.30 -58.8 -52.5 -57.5 65 -99 SPO 1997 10 15 07 42 55 4.9 -9 679.30 -58.9 -52.6 -57.5 66 -99 SPO 1997 10 15 07 43 56 4.8 -9 679.30 -58.9 -52.7 -57.5 65 -99 SPO 1997 10 15 07 44 58 4.6 -9 679.30 -58.9 -53.0 -57.5 65 -99 SPO 1997 10 15 07 45 58 4.4 -9 679.30 -58.9 -53.1 -57.5 65 -99 SPO 1997 10 15 07 46 58 4.6 -9 679.30 -59.0 -53.1 -57.5 65 -99 SPO 1997 10 15 07 47 57 4.8 -9 679.30 -59.0 -53.0 -57.5 65 -99 SPO 1997 10 15 07 48 57 5.0 -9 679.30 -58.9 -52.9 -57.6 65 -99 SPO 1997 10 15 07 49 57 5.0 -9 679.30 -58.9 -52.6 -57.6 65 -99 SPO 1997 10 15 07 50 56 5.3 -9 679.30 -58.9 -52.5 -57.6 65 -99 SPO 1997 10 15 07 51 55 5.5 -9 679.30 -58.9 -52.5 -57.6 65 -99 SPO 1997 10 15 07 52 56 5.3 -9 679.30 -59.0 -52.6 -57.6 66 -99 SPO 1997 10 15 07 53 55 5.4 -9 679.30 -59.1 -52.4 -57.6 66 -99 SPO 1997 10 15 07 54 55 5.6 -9 679.30 -59.0 -52.2 -57.8 65 -99 SPO 1997 10 15 07 55 57 5.5 -9 679.30 -59.0 -52.4 -57.8 65 -99 SPO 1997 10 15 07 56 60 5.2 -9 679.30 -59.0 -52.3 -57.9 65 -99 SPO 1997 10 15 07 57 62 4.9 -9 679.30 -59.2 -52.6 -57.9 66 -99 SPO 1997 10 15 07 58 63 5.0 -9 679.30 -59.2 -53.0 -57.9 66 -99 SPO 1997 10 15 07 59 63 4.9 -9 679.30 -59.2 -52.8 -58.0 66 -99 SPO 1997 10 15 08 00 64 4.5 -9 679.30 -59.4 -53.2 -57.9 67 0 SPO 1997 10 15 08 01 65 4.5 -9 679.30 -59.4 -53.3 -58.0 67 -99 SPO 1997 10 15 08 02 66 4.2 -9 679.30 -59.4 -53.3 -58.0 66 -99 SPO 1997 10 15 08 03 66 4.1 -9 679.30 -59.5 -53.7 -57.9 67 -99 SPO 1997 10 15 08 04 63 4.4 -9 679.30 -59.5 -53.6 -58.0 67 -99 SPO 1997 10 15 08 05 61 4.4 -9 679.30 -59.5 -53.3 -58.0 66 -99 SPO 1997 10 15 08 06 61 4.0 -9 679.30 -59.5 -53.7 -58.0 66 -99 SPO 1997 10 15 08 07 62 4.3 -9 679.30 -59.5 -53.8 -58.0 65 -99 SPO 1997 10 15 08 08 63 4.3 -9 679.30 -59.5 -53.5 -58.0 64 -99 SPO 1997 10 15 08 09 65 4.4 -9 679.30 -59.4 -53.4 -58.0 63 -99 SPO 1997 10 15 08 10 64 4.4 -9 679.30 -59.4 -53.2 -58.0 63 -99 SPO 1997 10 15 08 11 63 4.5 -9 679.30 -59.5 -53.3 -58.0 64 -99 SPO 1997 10 15 08 12 65 4.4 -9 679.40 -59.5 -53.4 -58.0 64 -99 SPO 1997 10 15 08 13 69 4.2 -9 679.40 -59.5 -53.5 -58.0 64 -99 SPO 1997 10 15 08 14 72 4.2 -9 679.40 -59.6 -53.9 -58.0 66 -99 SPO 1997 10 15 08 15 72 4.3 -9 679.40 -59.6 -54.3 -57.9 66 -99 SPO 1997 10 15 08 16 70 4.4 -9 679.40 -59.6 -54.6 -58.0 65 -99 SPO 1997 10 15 08 17 71 4.4 -9 679.40 -59.6 -54.4 -58.1 65 -99 SPO 1997 10 15 08 18 72 4.4 -9 679.40 -59.6 -54.9 -58.1 64 -99 SPO 1997 10 15 08 19 71 4.4 -9 679.40 -59.6 -55.1 -58.2 64 -99 SPO 1997 10 15 08 20 70 4.4 -9 679.40 -59.7 -55.0 -58.2 64 -99 SPO 1997 10 15 08 21 70 4.5 -9 679.40 -59.7 -55.2 -58.3 64 -99 SPO 1997 10 15 08 22 70 4.5 -9 679.40 -59.6 -54.9 -58.3 64 -99 SPO 1997 10 15 08 23 70 4.5 -9 679.40 -59.6 -55.0 -58.3 64 -99 SPO 1997 10 15 08 24 71 4.5 -9 679.40 -59.5 -55.1 -58.2 64 -99 SPO 1997 10 15 08 25 72 4.5 -9 679.40 -59.5 -55.1 -58.2 64 -99 SPO 1997 10 15 08 26 71 4.6 -9 679.50 -59.5 -55.2 -58.2 64 -99 SPO 1997 10 15 08 27 71 4.6 -9 679.50 -59.5 -55.5 -58.2 64 -99 SPO 1997 10 15 08 28 69 4.7 -9 679.50 -59.4 -55.7 -58.2 64 -99 SPO 1997 10 15 08 29 67 4.5 -9 679.50 -59.5 -55.9 -58.1 65 -99 SPO 1997 10 15 08 30 67 4.5 -9 679.50 -59.5 -55.9 -58.1 64 -99 SPO 1997 10 15 08 31 67 4.2 -9 679.50 -59.5 -56.0 -58.0 64 -99 SPO 1997 10 15 08 32 68 4.3 -9 679.50 -59.5 -56.2 -58.0 64 -99 SPO 1997 10 15 08 33 67 4.4 -9 679.50 -59.5 -56.2 -58.0 64 -99 SPO 1997 10 15 08 34 66 4.5 -9 679.50 -59.4 -56.0 -58.0 64 -99 SPO 1997 10 15 08 35 65 4.4 -9 679.50 -59.4 -56.0 -57.9 65 -99 SPO 1997 10 15 08 36 64 4.5 -9 679.50 -59.4 -55.9 -57.9 65 -99 SPO 1997 10 15 08 37 62 4.7 -9 679.50 -59.3 -55.8 -57.9 65 -99 SPO 1997 10 15 08 38 61 4.7 -9 679.50 -59.3 -55.6 -57.9 65 -99 SPO 1997 10 15 08 39 60 4.6 -9 679.50 -59.4 -55.4 -57.9 65 -99 SPO 1997 10 15 08 40 61 4.5 -9 679.50 -59.4 -55.5 -57.9 66 -99 SPO 1997 10 15 08 41 60 4.6 -9 679.50 -59.3 -55.6 -57.8 66 -99 SPO 1997 10 15 08 42 60 4.6 -9 679.50 -59.3 -55.4 -57.8 66 -99 SPO 1997 10 15 08 43 59 4.5 -9 679.50 -59.2 -55.3 -57.8 65 -99 SPO 1997 10 15 08 44 59 4.6 -9 679.40 -59.2 -55.2 -57.8 65 -99 SPO 1997 10 15 08 45 58 4.5 -9 679.40 -59.2 -55.2 -57.8 65 -99 SPO 1997 10 15 08 46 59 4.4 -9 679.40 -59.2 -55.5 -57.7 65 -99 SPO 1997 10 15 08 47 60 4.4 -9 679.40 -59.2 -55.3 -57.7 65 -99 SPO 1997 10 15 08 48 60 4.7 -9 679.40 -59.2 -55.0 -57.7 65 -99 SPO 1997 10 15 08 49 60 4.3 -9 679.40 -59.2 -54.8 -57.6 65 -99 SPO 1997 10 15 08 50 61 4.3 -9 679.40 -59.2 -55.1 -57.6 66 -99 SPO 1997 10 15 08 51 61 4.4 -9 679.50 -59.1 -55.0 -57.6 65 -99 SPO 1997 10 15 08 52 62 4.1 -9 679.50 -59.2 -55.2 -57.5 67 -99 SPO 1997 10 15 08 53 65 4.4 -9 679.40 -59.2 -55.6 -57.6 67 -99 SPO 1997 10 15 08 54 67 4.4 -9 679.40 -59.1 -55.4 -57.6 66 -99 SPO 1997 10 15 08 55 67 4.6 -9 679.40 -59.1 -55.4 -57.7 65 -99 SPO 1997 10 15 08 56 67 4.5 -9 679.40 -59.2 -55.5 -57.7 65 -99 SPO 1997 10 15 08 57 68 4.4 -9 679.40 -59.2 -55.7 -57.7 65 -99 SPO 1997 10 15 08 58 69 4.5 -9 679.40 -59.3 -55.9 -57.7 65 -99 SPO 1997 10 15 08 59 68 4.4 -9 679.40 -59.3 -55.9 -57.7 65 -99 SPO 1997 10 15 09 00 67 4.6 -9 679.40 -59.3 -55.9 -57.7 65 0 SPO 1997 10 15 09 01 67 4.5 -9 679.40 -59.3 -56.0 -57.8 66 -99 SPO 1997 10 15 09 02 67 4.5 -9 679.40 -59.3 -56.0 -57.8 66 -99 SPO 1997 10 15 09 03 66 4.5 -9 679.40 -59.4 -55.9 -57.8 67 -99 SPO 1997 10 15 09 04 66 4.5 -9 679.40 -59.4 -55.8 -57.8 67 -99 SPO 1997 10 15 09 05 66 4.4 -9 679.50 -59.4 -55.7 -57.8 67 -99 SPO 1997 10 15 09 06 67 4.3 -9 679.50 -59.4 -55.7 -57.7 67 -99 SPO 1997 10 15 09 07 67 4.4 -9 679.50 -59.4 -55.8 -57.7 66 -99 SPO 1997 10 15 09 08 65 4.6 -9 679.50 -59.4 -55.8 -57.8 65 -99 SPO 1997 10 15 09 09 63 4.6 -9 679.50 -59.5 -55.7 -57.8 66 -99 SPO 1997 10 15 09 10 62 4.6 -9 679.50 -59.4 -55.5 -57.8 65 -99 SPO 1997 10 15 09 11 62 4.6 -9 679.50 -59.4 -55.3 -57.8 65 -99 SPO 1997 10 15 09 12 61 4.6 -9 679.50 -59.4 -55.0 -57.7 65 -99 SPO 1997 10 15 09 13 60 4.7 -9 679.50 -59.4 -54.8 -57.8 66 -99 SPO 1997 10 15 09 14 61 4.8 -9 679.50 -59.4 -54.7 -57.8 66 -99 SPO 1997 10 15 09 15 62 4.8 -9 679.60 -59.4 -54.6 -57.8 66 -99 SPO 1997 10 15 09 16 62 4.7 -9 679.60 -59.4 -54.6 -57.8 66 -99 SPO 1997 10 15 09 17 61 4.7 -9 679.60 -59.4 -54.5 -57.8 65 -99 SPO 1997 10 15 09 18 60 4.7 -9 679.60 -59.4 -54.4 -57.8 65 -99 SPO 1997 10 15 09 19 61 4.5 -9 679.60 -59.4 -54.4 -57.8 65 -99 SPO 1997 10 15 09 20 63 4.6 -9 679.60 -59.4 -54.5 -57.8 65 -99 SPO 1997 10 15 09 21 62 4.5 -9 679.60 -59.4 -54.6 -57.9 65 -99 SPO 1997 10 15 09 22 62 4.5 -9 679.60 -59.5 -54.6 -57.9 65 -99 SPO 1997 10 15 09 23 62 4.3 -9 679.60 -59.6 -54.7 -57.9 66 -99 SPO 1997 10 15 09 24 62 4.3 -9 679.60 -59.6 -54.9 -57.9 67 -99 SPO 1997 10 15 09 25 62 4.3 -9 679.60 -59.6 -55.0 -57.9 67 -99 SPO 1997 10 15 09 26 62 4.3 -9 679.60 -59.7 -55.0 -57.9 68 -99 SPO 1997 10 15 09 27 65 4.2 -9 679.60 -59.7 -55.1 -58.0 67 -99 SPO 1997 10 15 09 28 67 4.2 -9 679.70 -59.7 -55.1 -58.0 66 -99 SPO 1997 10 15 09 29 66 4.2 -9 679.70 -59.7 -55.2 -58.0 66 -99 SPO 1997 10 15 09 30 63 4.4 -9 679.60 -59.7 -55.2 -58.0 66 -99 SPO 1997 10 15 09 31 62 4.5 -9 679.60 -59.7 -55.0 -58.1 65 -99 SPO 1997 10 15 09 32 63 4.5 -9 679.60 -59.8 -55.1 -58.1 65 -99 SPO 1997 10 15 09 33 64 4.6 -9 679.60 -59.8 -55.2 -58.1 65 -99 SPO 1997 10 15 09 34 63 4.6 -9 679.60 -59.8 -55.2 -58.2 64 -99 SPO 1997 10 15 09 35 62 4.6 -9 679.60 -59.8 -55.2 -58.2 64 -99 SPO 1997 10 15 09 36 62 4.5 -9 679.60 -59.8 -55.4 -58.1 64 -99 SPO 1997 10 15 09 37 64 4.5 -9 679.60 -59.9 -55.7 -58.1 66 -99 SPO 1997 10 15 09 38 63 4.5 -9 679.60 -59.9 -55.7 -58.2 66 -99 SPO 1997 10 15 09 39 62 4.6 -9 679.60 -59.9 -55.8 -58.2 66 -99 SPO 1997 10 15 09 40 62 4.6 -9 679.60 -59.9 -55.9 -58.2 66 -99 SPO 1997 10 15 09 41 64 4.6 -9 679.60 -59.9 -55.8 -58.2 66 -99 SPO 1997 10 15 09 42 65 4.6 -9 679.60 -59.8 -55.9 -58.2 65 -99 SPO 1997 10 15 09 43 66 4.6 -9 679.60 -59.8 -55.9 -58.2 65 -99 SPO 1997 10 15 09 44 66 4.6 -9 679.60 -59.8 -55.9 -58.3 64 -99 SPO 1997 10 15 09 45 66 4.7 -9 679.60 -59.8 -55.8 -58.3 64 -99 SPO 1997 10 15 09 46 65 4.7 -9 679.60 -59.8 -55.5 -58.3 64 -99 SPO 1997 10 15 09 47 65 4.6 -9 679.60 -59.8 -55.2 -58.3 64 -99 SPO 1997 10 15 09 48 66 4.5 -9 679.60 -59.8 -55.0 -58.2 64 -99 SPO 1997 10 15 09 49 66 4.4 -9 679.60 -59.8 -55.0 -58.2 64 -99 SPO 1997 10 15 09 50 65 4.6 -9 679.60 -59.8 -55.1 -58.2 64 -99 SPO 1997 10 15 09 51 66 4.5 -9 679.60 -59.8 -55.2 -58.2 64 -99 SPO 1997 10 15 09 52 65 4.5 -9 679.60 -59.8 -55.2 -58.2 65 -99 SPO 1997 10 15 09 53 64 4.4 -9 679.60 -59.8 -55.2 -58.2 65 -99 SPO 1997 10 15 09 54 64 4.5 -9 679.60 -59.8 -55.4 -58.2 65 -99 SPO 1997 10 15 09 55 65 4.2 -9 679.70 -59.8 -55.7 -58.2 65 -99 SPO 1997 10 15 09 56 67 4.2 -9 679.70 -59.8 -56.0 -58.2 65 -99 SPO 1997 10 15 09 57 69 4.2 -9 679.60 -59.8 -56.2 -58.2 64 -99 SPO 1997 10 15 09 58 69 4.3 -9 679.70 -59.8 -56.2 -58.2 64 -99 SPO 1997 10 15 09 59 71 4.4 -9 679.60 -59.8 -56.2 -58.2 64 -99 SPO 1997 10 15 10 00 71 4.6 -9 679.60 -59.8 -56.2 -58.2 64 0 SPO 1997 10 15 10 01 69 4.7 -9 679.60 -59.8 -56.2 -58.3 64 -99 SPO 1997 10 15 10 02 69 4.8 -9 679.60 -59.8 -56.2 -58.3 64 -99 SPO 1997 10 15 10 03 69 4.7 -9 679.60 -59.8 -56.1 -58.3 65 -99 SPO 1997 10 15 10 04 68 4.7 -9 679.60 -59.8 -56.1 -58.3 65 -99 SPO 1997 10 15 10 05 68 4.6 -9 679.60 -59.8 -56.1 -58.3 65 -99 SPO 1997 10 15 10 06 68 4.6 -9 679.60 -59.8 -56.1 -58.3 65 -99 SPO 1997 10 15 10 07 68 4.6 -9 679.60 -59.8 -56.1 -58.3 64 -99 SPO 1997 10 15 10 08 69 4.7 -9 679.60 -59.8 -56.2 -58.3 64 -99 SPO 1997 10 15 10 09 68 4.8 -9 679.60 -59.8 -56.3 -58.3 63 -99 SPO 1997 10 15 10 10 67 4.9 -9 679.60 -59.8 -56.3 -58.4 64 -99 SPO 1997 10 15 10 11 64 5.0 -9 679.60 -59.8 -56.2 -58.4 64 -99 SPO 1997 10 15 10 12 62 5.1 -9 679.60 -59.8 -56.0 -58.4 64 -99 SPO 1997 10 15 10 13 60 5.1 -9 679.60 -59.8 -55.5 -58.4 64 -99 SPO 1997 10 15 10 14 60 5.0 -9 679.60 -59.8 -55.3 -58.3 64 -99 SPO 1997 10 15 10 15 61 4.9 -9 679.60 -59.8 -55.4 -58.3 64 -99 SPO 1997 10 15 10 16 61 4.7 -9 679.60 -59.8 -55.5 -58.3 65 -99 SPO 1997 10 15 10 17 61 4.8 -9 679.60 -59.8 -55.7 -58.3 65 -99 SPO 1997 10 15 10 18 61 4.7 -9 679.60 -59.8 -55.5 -58.3 66 -99 SPO 1997 10 15 10 19 62 4.6 -9 679.60 -59.8 -55.6 -58.3 66 -99 SPO 1997 10 15 10 20 62 4.6 -9 679.60 -59.8 -55.8 -58.3 67 -99 SPO 1997 10 15 10 21 61 4.6 -9 679.60 -59.8 -55.8 -58.3 66 -99 SPO 1997 10 15 10 22 61 4.5 -9 679.60 -59.7 -55.8 -58.2 65 -99 SPO 1997 10 15 10 23 62 4.4 -9 679.50 -59.8 -56.1 -58.2 65 -99 SPO 1997 10 15 10 24 63 4.5 -9 679.60 -59.8 -56.2 -58.2 65 -99 SPO 1997 10 15 10 25 64 4.5 -9 679.60 -59.8 -56.3 -58.2 64 -99 SPO 1997 10 15 10 26 63 4.5 -9 679.60 -59.8 -56.4 -58.2 64 -99 SPO 1997 10 15 10 27 62 4.5 -9 679.60 -59.8 -56.4 -58.2 65 -99 SPO 1997 10 15 10 28 62 4.6 -9 679.60 -59.8 -56.4 -58.2 65 -99 SPO 1997 10 15 10 29 62 4.5 -9 679.50 -59.8 -56.3 -58.2 66 -99 SPO 1997 10 15 10 30 62 4.5 -9 679.60 -59.8 -56.5 -58.2 66 -99 SPO 1997 10 15 10 31 62 4.5 -9 679.60 -59.7 -56.5 -58.2 65 -99 SPO 1997 10 15 10 32 63 4.3 -9 679.60 -59.7 -56.4 -58.2 65 -99 SPO 1997 10 15 10 33 65 4.2 -9 679.60 -59.7 -56.4 -58.1 65 -99 SPO 1997 10 15 10 34 65 4.0 -9 679.60 -59.7 -56.6 -58.1 65 -99 SPO 1997 10 15 10 35 64 4.0 -9 679.60 -59.7 -56.7 -58.1 65 -99 SPO 1997 10 15 10 36 62 4.0 -9 679.60 -59.7 -56.7 -58.0 65 -99 SPO 1997 10 15 10 37 60 4.0 -9 679.60 -59.7 -56.6 -58.0 65 -99 SPO 1997 10 15 10 38 62 3.9 -9 679.60 -59.7 -56.6 -58.0 66 -99 SPO 1997 10 15 10 39 62 3.7 -9 679.60 -59.7 -56.6 -58.0 66 -99 SPO 1997 10 15 10 40 62 3.6 -9 679.60 -59.8 -56.7 -57.9 67 -99 SPO 1997 10 15 10 41 61 3.6 -9 679.60 -59.8 -56.5 -57.9 67 -99 SPO 1997 10 15 10 42 60 3.6 -9 679.60 -59.8 -56.4 -57.8 68 -99 SPO 1997 10 15 10 43 60 3.6 -9 679.60 -59.8 -56.5 -57.8 67 -99 SPO 1997 10 15 10 44 58 3.6 -9 679.60 -59.8 -56.4 -57.8 67 -99 SPO 1997 10 15 10 45 56 3.7 -9 679.60 -59.9 -56.1 -57.8 68 -99 SPO 1997 10 15 10 46 57 3.8 -9 679.60 -59.9 -55.8 -57.8 67 -99 SPO 1997 10 15 10 47 59 3.8 -9 679.60 -59.9 -55.7 -57.9 66 -99 SPO 1997 10 15 10 48 60 3.8 -9 679.60 -59.9 -55.8 -58.0 66 -99 SPO 1997 10 15 10 49 57 3.8 -9 679.60 -60.0 -55.8 -58.0 66 -99 SPO 1997 10 15 10 50 56 3.8 -9 679.60 -60.0 -55.8 -58.0 66 -99 SPO 1997 10 15 10 51 55 3.8 -9 679.60 -60.1 -55.8 -58.0 68 -99 SPO 1997 10 15 10 52 55 3.7 -9 679.60 -60.1 -55.8 -58.0 68 -99 SPO 1997 10 15 10 53 55 3.9 -9 679.60 -60.1 -55.7 -58.0 68 -99 SPO 1997 10 15 10 54 56 3.8 -9 679.60 -60.1 -55.6 -58.0 68 -99 SPO 1997 10 15 10 55 59 3.7 -9 679.60 -60.1 -55.7 -58.0 69 -99 SPO 1997 10 15 10 56 62 3.6 -9 679.60 -60.1 -55.9 -58.1 68 -99 SPO 1997 10 15 10 57 65 3.7 -9 679.60 -60.1 -56.2 -58.1 68 -99 SPO 1997 10 15 10 58 64 3.8 -9 679.60 -60.1 -56.2 -58.1 67 -99 SPO 1997 10 15 10 59 63 3.8 -9 679.60 -60.2 -56.2 -58.1 67 -99 SPO 1997 10 15 11 00 61 3.9 -9 679.60 -60.2 -56.3 -58.1 66 0 SPO 1997 10 15 11 01 62 3.9 -9 679.60 -60.2 -56.2 -58.2 65 -99 SPO 1997 10 15 11 02 63 3.8 -9 679.60 -60.2 -56.3 -58.2 65 -99 SPO 1997 10 15 11 03 63 4.0 -9 679.60 -60.2 -55.8 -58.2 65 -99 SPO 1997 10 15 11 04 61 3.9 -9 679.70 -60.2 -55.7 -58.3 65 -99 SPO 1997 10 15 11 05 60 3.9 -9 679.70 -60.2 -55.9 -58.3 66 -99 SPO 1997 10 15 11 06 60 3.8 -9 679.70 -60.3 -56.1 -58.3 67 -99 SPO 1997 10 15 11 07 58 3.8 -9 679.70 -60.4 -56.2 -58.3 67 -99 SPO 1997 10 15 11 08 59 3.9 -9 679.70 -60.4 -56.0 -58.3 67 -99 SPO 1997 10 15 11 09 59 3.9 -9 679.70 -60.3 -55.9 -58.4 66 -99 SPO 1997 10 15 11 10 59 3.9 -9 679.70 -60.4 -56.1 -58.4 68 -99 SPO 1997 10 15 11 11 58 3.9 -9 679.70 -60.4 -56.2 -58.4 68 -99 SPO 1997 10 15 11 12 59 3.8 -9 679.70 -60.4 -56.2 -58.4 67 -99 SPO 1997 10 15 11 13 59 3.6 -9 679.70 -60.4 -56.1 -58.4 67 -99 SPO 1997 10 15 11 14 61 3.6 -9 679.70 -60.5 -56.2 -58.3 66 -99 SPO 1997 10 15 11 15 61 3.4 -9 679.70 -60.5 -56.4 -58.3 66 -99 SPO 1997 10 15 11 16 62 3.7 -9 679.70 -60.5 -56.2 -58.3 66 -99 SPO 1997 10 15 11 17 62 4.0 -9 679.70 -60.4 -55.2 -58.3 66 -99 SPO 1997 10 15 11 18 62 3.6 -9 679.70 -60.4 -55.2 -58.3 66 -99 SPO 1997 10 15 11 19 63 3.5 -9 679.70 -60.6 -55.9 -58.2 68 -99 SPO 1997 10 15 11 20 61 3.6 -9 679.60 -60.5 -55.9 -58.3 67 -99 SPO 1997 10 15 11 21 63 3.6 -9 679.60 -60.5 -55.8 -58.4 67 -99 SPO 1997 10 15 11 22 64 3.6 -9 679.60 -60.5 -55.8 -58.4 67 -99 SPO 1997 10 15 11 23 67 3.5 -9 679.60 -60.5 -56.1 -58.4 67 -99 SPO 1997 10 15 11 24 66 3.6 -9 679.70 -60.6 -56.3 -58.2 68 -99 SPO 1997 10 15 11 25 67 3.5 -9 679.70 -60.6 -56.2 -58.1 67 -99 SPO 1997 10 15 11 26 68 3.5 -9 679.70 -60.6 -56.4 -58.1 67 -99 SPO 1997 10 15 11 27 69 3.5 -9 679.60 -60.6 -56.6 -58.1 65 -99 SPO 1997 10 15 11 28 66 3.7 -9 679.60 -60.7 -56.6 -58.2 66 -99 SPO 1997 10 15 11 29 66 3.7 -9 679.60 -60.6 -56.0 -58.4 64 -99 SPO 1997 10 15 11 30 67 3.6 -9 679.60 -60.7 -56.2 -58.4 65 -99 SPO 1997 10 15 11 31 68 3.6 -9 679.60 -60.7 -56.6 -58.4 66 -99 SPO 1997 10 15 11 32 66 3.5 -9 679.60 -60.7 -56.5 -58.4 66 -99 SPO 1997 10 15 11 33 68 3.4 -9 679.60 -60.7 -56.7 -58.4 66 -99 SPO 1997 10 15 11 34 66 3.5 -9 679.60 -60.8 -56.6 -58.3 67 -99 SPO 1997 10 15 11 35 65 3.6 -9 679.60 -60.7 -56.5 -58.4 67 -99 SPO 1997 10 15 11 36 65 3.7 -9 679.60 -60.6 -56.2 -58.4 66 -99 SPO 1997 10 15 11 37 63 3.7 -9 679.60 -60.6 -55.9 -58.5 66 -99 SPO 1997 10 15 11 38 62 3.8 -9 679.60 -60.7 -55.6 -58.6 67 -99 SPO 1997 10 15 11 39 62 3.9 -9 679.60 -60.7 -55.4 -58.6 66 -99 SPO 1997 10 15 11 40 61 4.0 -9 679.60 -60.6 -55.2 -58.7 65 -99 SPO 1997 10 15 11 41 62 4.0 -9 679.60 -60.6 -55.2 -58.7 65 -99 SPO 1997 10 15 11 42 60 4.0 -9 679.50 -60.6 -55.5 -58.7 65 -99 SPO 1997 10 15 11 43 59 4.0 -9 679.50 -60.6 -55.6 -58.7 65 -99 SPO 1997 10 15 11 44 58 4.0 -9 679.50 -60.6 -55.4 -58.7 66 -99 SPO 1997 10 15 11 45 59 4.0 -9 679.50 -60.5 -55.2 -58.6 66 -99 SPO 1997 10 15 11 46 60 4.0 -9 679.50 -60.4 -55.1 -58.6 65 -99 SPO 1997 10 15 11 47 58 4.0 -9 679.50 -60.4 -55.0 -58.6 66 -99 SPO 1997 10 15 11 48 57 4.0 -9 679.50 -60.4 -55.1 -58.6 67 -99 SPO 1997 10 15 11 49 60 4.0 -9 679.50 -60.4 -55.2 -58.6 67 -99 SPO 1997 10 15 11 50 61 3.9 -9 679.50 -60.4 -55.2 -58.6 67 -99 SPO 1997 10 15 11 51 60 4.0 -9 679.50 -60.3 -55.2 -58.5 67 -99 SPO 1997 10 15 11 52 60 4.0 -9 679.50 -60.2 -55.2 -58.5 66 -99 SPO 1997 10 15 11 53 59 4.0 -9 679.50 -60.3 -55.1 -58.5 67 -99 SPO 1997 10 15 11 54 59 4.1 -9 679.50 -60.3 -55.1 -58.5 66 -99 SPO 1997 10 15 11 55 59 4.1 -9 679.50 -60.3 -54.8 -58.6 66 -99 SPO 1997 10 15 11 56 59 4.0 -9 679.50 -60.2 -54.9 -58.6 65 -99 SPO 1997 10 15 11 57 58 4.0 -9 679.50 -60.2 -55.0 -58.6 66 -99 SPO 1997 10 15 11 58 58 4.0 -9 679.50 -60.2 -54.9 -58.5 67 -99 SPO 1997 10 15 11 59 58 3.9 -9 679.50 -60.2 -55.0 -58.5 67 -99 SPO 1997 10 15 12 00 58 4.0 -9 679.50 -60.3 -55.1 -58.5 68 0 SPO 1997 10 15 12 01 57 4.0 -9 679.50 -60.3 -55.2 -58.6 68 -99 SPO 1997 10 15 12 02 56 4.1 -9 679.50 -60.3 -55.2 -58.6 68 -99 SPO 1997 10 15 12 03 54 4.0 -9 679.50 -60.3 -55.1 -58.7 68 -99 SPO 1997 10 15 12 04 53 4.0 -9 679.50 -60.3 -55.2 -58.7 69 -99 SPO 1997 10 15 12 05 51 4.0 -9 679.50 -60.4 -55.1 -58.8 69 -99 SPO 1997 10 15 12 06 52 3.9 -9 679.50 -60.4 -55.0 -58.8 69 -99 SPO 1997 10 15 12 07 54 4.0 -9 679.50 -60.5 -54.8 -58.8 68 -99 SPO 1997 10 15 12 08 53 4.1 -9 679.50 -60.5 -54.8 -58.9 68 -99 SPO 1997 10 15 12 09 52 4.2 -9 679.50 -60.6 -54.9 -58.9 68 -99 SPO 1997 10 15 12 10 53 4.2 -9 679.50 -60.6 -54.9 -58.9 68 -99 SPO 1997 10 15 12 11 52 4.1 -9 679.50 -60.6 -54.8 -58.9 68 -99 SPO 1997 10 15 12 12 52 4.2 -9 679.50 -60.6 -54.8 -58.9 68 -99 SPO 1997 10 15 12 13 53 4.1 -9 679.50 -60.5 -54.8 -58.9 68 -99 SPO 1997 10 15 12 14 52 3.9 -9 679.50 -60.5 -55.1 -58.9 67 -99 SPO 1997 10 15 12 15 52 3.9 -9 679.50 -60.4 -55.2 -58.9 66 -99 SPO 1997 10 15 12 16 52 3.9 -9 679.50 -60.4 -55.1 -58.9 67 -99 SPO 1997 10 15 12 17 53 3.8 -9 679.50 -60.4 -55.0 -58.9 67 -99 SPO 1997 10 15 12 18 52 3.8 -9 679.60 -60.4 -54.9 -58.9 67 -99 SPO 1997 10 15 12 19 51 4.3 -9 679.50 -60.3 -54.6 -58.8 66 -99 SPO 1997 10 15 12 20 49 4.3 -9 679.60 -60.1 -54.6 -58.8 64 -99 SPO 1997 10 15 12 21 51 3.8 -9 679.60 -60.2 -55.0 -58.8 66 -99 SPO 1997 10 15 12 22 54 4.2 -9 679.60 -60.2 -55.0 -58.8 67 -99 SPO 1997 10 15 12 23 52 3.7 -9 679.60 -60.2 -55.0 -58.8 67 -99 SPO 1997 10 15 12 24 51 4.0 -9 679.60 -60.3 -54.8 -58.8 68 -99 SPO 1997 10 15 12 25 50 3.9 -9 679.60 -60.3 -54.6 -58.8 69 -99 SPO 1997 10 15 12 26 51 4.0 -9 679.60 -60.3 -54.5 -58.8 69 -99 SPO 1997 10 15 12 27 50 4.2 -9 679.60 -60.2 -54.6 -58.8 69 -99 SPO 1997 10 15 12 28 49 4.1 -9 679.60 -60.2 -54.5 -58.8 69 -99 SPO 1997 10 15 12 29 51 4.3 -9 679.50 -60.2 -54.2 -58.9 69 -99 SPO 1997 10 15 12 30 51 4.4 -9 679.50 -60.2 -54.3 -58.9 69 -99 SPO 1997 10 15 12 31 50 4.5 -9 679.50 -60.2 -54.4 -59.0 68 -99 SPO 1997 10 15 12 32 50 4.4 -9 679.50 -60.3 -54.5 -59.0 68 -99 SPO 1997 10 15 12 33 51 4.3 -9 679.50 -60.3 -54.5 -59.1 68 -99 SPO 1997 10 15 12 34 53 4.6 -9 679.50 -60.2 -54.3 -59.0 66 -99 SPO 1997 10 15 12 35 53 4.2 -9 679.60 -60.0 -54.4 -58.9 65 -99 SPO 1997 10 15 12 36 54 4.4 -9 679.50 -60.0 -54.3 -58.9 65 -99 SPO 1997 10 15 12 37 55 4.2 -9 679.50 -60.0 -54.4 -59.0 66 -99 SPO 1997 10 15 12 38 56 4.1 -9 679.60 -60.1 -54.6 -59.0 68 -99 SPO 1997 10 15 12 39 56 4.0 -9 679.50 -60.2 -54.9 -58.9 69 -99 SPO 1997 10 15 12 40 55 4.1 -9 679.50 -60.2 -54.7 -59.0 69 -99 SPO 1997 10 15 12 41 53 4.3 -9 679.50 -60.3 -54.7 -59.0 70 -99 SPO 1997 10 15 12 42 54 4.2 -9 679.50 -60.3 -54.7 -59.0 69 -99 SPO 1997 10 15 12 43 56 4.0 -9 679.50 -60.3 -54.8 -59.1 69 -99 SPO 1997 10 15 12 44 57 4.0 -9 679.50 -60.2 -54.8 -59.0 67 -99 SPO 1997 10 15 12 45 57 3.9 -9 679.50 -60.2 -54.9 -59.0 67 -99 SPO 1997 10 15 12 46 55 4.2 -9 679.50 -60.2 -55.0 -59.0 67 -99 SPO 1997 10 15 12 47 56 4.3 -9 679.50 -60.2 -55.1 -59.0 67 -99 SPO 1997 10 15 12 48 57 4.1 -9 679.50 -60.2 -55.2 -59.0 67 -99 SPO 1997 10 15 12 49 58 4.0 -9 679.50 -60.2 -55.5 -59.1 68 -99 SPO 1997 10 15 12 50 58 4.2 -9 679.50 -60.3 -55.5 -59.1 69 -99 SPO 1997 10 15 12 51 57 4.3 -9 679.50 -60.3 -55.6 -59.2 69 -99 SPO 1997 10 15 12 52 60 4.1 -9 679.50 -60.3 -55.6 -59.2 68 -99 SPO 1997 10 15 12 53 64 4.1 -9 679.50 -60.4 -55.8 -59.2 69 -99 SPO 1997 10 15 12 54 63 4.2 -9 679.50 -60.4 -55.8 -59.2 69 -99 SPO 1997 10 15 12 55 60 4.4 -9 679.50 -60.3 -55.6 -59.2 68 -99 SPO 1997 10 15 12 56 58 4.4 -9 679.50 -60.3 -55.3 -59.3 67 -99 SPO 1997 10 15 12 57 59 4.3 -9 679.50 -60.4 -55.1 -59.4 67 -99 SPO 1997 10 15 12 58 60 4.3 -9 679.50 -60.5 -55.0 -59.4 66 -99 SPO 1997 10 15 12 59 60 4.1 -9 679.50 -60.5 -55.0 -59.3 66 -99 SPO 1997 10 15 13 00 59 4.5 -9 679.50 -60.5 -55.0 -59.4 66 0 SPO 1997 10 15 13 01 57 4.5 -9 679.50 -60.4 -54.9 -59.4 65 -99 SPO 1997 10 15 13 02 58 4.4 -9 679.40 -60.5 -54.9 -59.4 67 -99 SPO 1997 10 15 13 03 58 4.4 -9 679.40 -60.5 -54.8 -59.4 67 -99 SPO 1997 10 15 13 04 56 4.4 -9 679.40 -60.5 -54.8 -59.4 67 -99 SPO 1997 10 15 13 05 55 4.4 -9 679.40 -60.4 -54.6 -59.4 66 -99 SPO 1997 10 15 13 06 55 4.3 -9 679.40 -60.4 -54.4 -59.4 66 -99 SPO 1997 10 15 13 07 56 4.2 -9 679.40 -60.4 -54.4 -59.4 67 -99 SPO 1997 10 15 13 08 57 4.1 -9 679.40 -60.4 -54.4 -59.4 66 -99 SPO 1997 10 15 13 09 55 4.1 -9 679.40 -60.5 -54.6 -59.4 66 -99 SPO 1997 10 15 13 10 54 4.2 -9 679.40 -60.5 -54.4 -59.4 65 -99 SPO 1997 10 15 13 11 53 4.2 -9 679.40 -60.5 -54.3 -59.4 64 -99 SPO 1997 10 15 13 12 51 4.2 -9 679.40 -60.5 -54.2 -59.4 65 -99 SPO 1997 10 15 13 13 50 4.2 -9 679.40 -60.5 -54.0 -59.4 66 -99 SPO 1997 10 15 13 14 49 4.3 -9 679.40 -60.5 -54.0 -59.4 66 -99 SPO 1997 10 15 13 15 47 4.4 -9 679.40 -60.5 -54.0 -59.4 66 -99 SPO 1997 10 15 13 16 47 4.3 -9 679.30 -60.5 -53.9 -59.4 66 -99 SPO 1997 10 15 13 17 47 4.2 -9 679.30 -60.5 -54.0 -59.4 66 -99 SPO 1997 10 15 13 18 47 4.2 -9 679.30 -60.5 -54.1 -59.4 66 -99 SPO 1997 10 15 13 19 46 4.3 -9 679.30 -60.5 -54.0 -59.4 66 -99 SPO 1997 10 15 13 20 46 4.3 -9 679.30 -60.4 -54.0 -59.4 64 -99 SPO 1997 10 15 13 21 45 4.4 -9 679.30 -60.4 -53.8 -59.4 63 -99 SPO 1997 10 15 13 22 47 4.3 -9 679.30 -60.4 -53.8 -59.4 63 -99 SPO 1997 10 15 13 23 49 4.1 -9 679.30 -60.5 -53.9 -59.4 63 -99 SPO 1997 10 15 13 24 49 4.0 -9 679.30 -60.5 -54.1 -59.4 63 -99 SPO 1997 10 15 13 25 50 3.9 -9 679.30 -60.6 -54.4 -59.4 63 -99 SPO 1997 10 15 13 26 50 3.8 -9 679.30 -60.6 -54.5 -59.4 64 -99 SPO 1997 10 15 13 27 51 3.8 -9 679.30 -60.6 -54.5 -59.3 64 -99 SPO 1997 10 15 13 28 52 3.7 -9 679.30 -60.6 -54.8 -59.3 64 -99 SPO 1997 10 15 13 29 54 3.6 -9 679.30 -60.6 -54.9 -59.3 64 -99 SPO 1997 10 15 13 30 55 3.6 -9 679.30 -60.6 -54.9 -59.3 64 -99 SPO 1997 10 15 13 31 56 3.6 -9 679.30 -60.7 -55.0 -59.3 65 -99 SPO 1997 10 15 13 32 56 3.6 -9 679.30 -60.7 -55.2 -59.4 66 -99 SPO 1997 10 15 13 33 56 3.4 -9 679.30 -60.8 -55.4 -59.3 67 -99 SPO 1997 10 15 13 34 54 3.4 -9 679.20 -60.8 -55.5 -59.3 66 -99 SPO 1997 10 15 13 35 55 3.3 -9 679.30 -60.9 -55.6 -59.2 67 -99 SPO 1997 10 15 13 36 55 3.2 -9 679.20 -60.9 -55.7 -59.2 66 -99 SPO 1997 10 15 13 37 56 3.1 -9 679.30 -60.9 -55.7 -59.0 66 -99 SPO 1997 10 15 13 38 60 2.9 -9 679.20 -61.0 -55.9 -58.9 67 -99 SPO 1997 10 15 13 39 60 2.9 -9 679.20 -61.0 -56.0 -59.0 67 -99 SPO 1997 10 15 13 40 59 3.1 -9 679.20 -61.0 -56.0 -59.0 67 -99 SPO 1997 10 15 13 41 56 3.3 -9 679.20 -61.0 -55.7 -59.0 66 -99 SPO 1997 10 15 13 42 58 3.5 -9 679.20 -61.0 -55.3 -59.1 65 -99 SPO 1997 10 15 13 43 60 3.5 -9 679.20 -61.0 -55.4 -59.1 66 -99 SPO 1997 10 15 13 44 64 3.4 -9 679.20 -61.0 -55.8 -59.1 66 -99 SPO 1997 10 15 13 45 63 3.7 -9 679.10 -61.0 -56.0 -59.1 66 -99 SPO 1997 10 15 13 46 62 3.7 -9 679.10 -61.0 -55.8 -59.1 66 -99 SPO 1997 10 15 13 47 62 3.5 -9 679.10 -61.0 -55.7 -59.1 66 -99 SPO 1997 10 15 13 48 61 3.5 -9 679.10 -61.1 -55.8 -59.1 67 -99 SPO 1997 10 15 13 49 58 3.7 -9 679.10 -61.1 -55.8 -59.2 66 -99 SPO 1997 10 15 13 50 56 3.9 -9 679.10 -61.1 -55.5 -59.4 65 -99 SPO 1997 10 15 13 51 56 3.8 -9 679.10 -61.1 -55.2 -59.4 66 -99 SPO 1997 10 15 13 52 56 3.8 -9 679.10 -61.1 -55.0 -59.4 66 -99 SPO 1997 10 15 13 53 57 3.7 -9 679.10 -61.2 -54.8 -59.4 66 -99 SPO 1997 10 15 13 54 58 3.4 -9 679.10 -61.2 -54.8 -59.2 66 -99 SPO 1997 10 15 13 55 58 3.5 -9 679.10 -61.3 -54.8 -59.2 66 -99 SPO 1997 10 15 13 56 56 3.6 -9 679.10 -61.3 -54.7 -59.4 66 -99 SPO 1997 10 15 13 57 55 3.8 -9 679.10 -61.2 -54.6 -59.4 64 -99 SPO 1997 10 15 13 58 55 4.1 -9 679.10 -61.1 -54.4 -59.5 63 -99 SPO 1997 10 15 13 59 54 4.1 -9 679.10 -61.1 -54.3 -59.5 63 -99 SPO 1997 10 15 14 00 54 4.0 -9 679.10 -61.1 -54.4 -59.4 63 0 SPO 1997 10 15 14 01 54 4.0 -9 679.10 -61.1 -54.6 -59.4 62 -99 SPO 1997 10 15 14 02 54 4.0 -9 679.00 -61.1 -54.9 -59.4 62 -99 SPO 1997 10 15 14 03 54 4.0 -9 679.00 -61.0 -54.9 -59.4 61 -99 SPO 1997 10 15 14 04 52 4.0 -9 679.00 -61.0 -54.8 -59.3 62 -99 SPO 1997 10 15 14 05 51 4.1 -9 679.00 -61.0 -54.6 -59.2 63 -99 SPO 1997 10 15 14 06 51 4.1 -9 679.00 -60.9 -54.4 -59.2 63 -99 SPO 1997 10 15 14 07 50 4.1 -9 679.00 -60.8 -54.2 -59.1 62 -99 SPO 1997 10 15 14 08 51 4.0 -9 679.10 -60.8 -54.0 -59.0 63 -99 SPO 1997 10 15 14 09 52 3.8 -9 679.10 -60.7 -54.3 -59.0 63 -99 SPO 1997 10 15 14 10 53 3.8 -9 679.10 -60.6 -54.4 -58.9 63 -99 SPO 1997 10 15 14 11 54 3.6 -9 679.10 -60.6 -54.8 -58.9 63 -99 SPO 1997 10 15 14 12 56 3.6 -9 679.10 -60.6 -55.0 -58.9 63 -99 SPO 1997 10 15 14 13 57 3.5 -9 679.10 -60.5 -55.0 -58.8 62 -99 SPO 1997 10 15 14 14 57 3.5 -9 679.10 -60.5 -55.2 -58.8 62 -99 SPO 1997 10 15 14 15 55 3.5 -9 679.10 -60.6 -55.4 -58.8 63 -99 SPO 1997 10 15 14 16 56 3.5 -9 679.10 -60.6 -55.6 -58.7 63 -99 SPO 1997 10 15 14 17 58 3.5 -9 679.10 -60.5 -55.8 -58.7 62 -99 SPO 1997 10 15 14 18 58 3.4 -9 679.10 -60.6 -55.8 -58.7 63 -99 SPO 1997 10 15 14 19 59 3.4 -9 679.10 -60.6 -55.9 -58.6 63 -99 SPO 1997 10 15 14 20 59 3.5 -9 679.10 -60.6 -56.1 -58.6 62 -99 SPO 1997 10 15 14 21 59 3.7 -9 679.10 -60.6 -56.0 -58.7 62 -99 SPO 1997 10 15 14 22 60 3.7 -9 679.10 -60.6 -56.1 -58.8 62 -99 SPO 1997 10 15 14 23 60 3.9 -9 679.00 -60.6 -56.1 -58.8 61 -99 SPO 1997 10 15 14 24 59 3.9 -9 679.00 -60.6 -56.0 -58.9 61 -99 SPO 1997 10 15 14 25 59 3.9 -9 679.00 -60.7 -56.1 -58.9 62 -99 SPO 1997 10 15 14 26 60 3.9 -9 679.00 -60.6 -56.1 -58.9 61 -99 SPO 1997 10 15 14 27 60 3.9 -9 679.00 -60.6 -56.1 -58.9 61 -99 SPO 1997 10 15 14 28 60 4.0 -9 679.00 -60.6 -56.0 -58.9 61 -99 SPO 1997 10 15 14 29 58 4.1 -9 678.90 -60.6 -56.0 -59.0 60 -99 SPO 1997 10 15 14 30 57 4.1 -9 678.90 -60.6 -55.9 -59.0 61 -99 SPO 1997 10 15 14 31 56 4.2 -9 678.90 -60.6 -55.9 -59.0 61 -99 SPO 1997 10 15 14 32 56 4.2 -9 678.90 -60.6 -55.8 -58.9 62 -99 SPO 1997 10 15 14 33 56 4.1 -9 678.90 -60.5 -55.8 -58.9 61 -99 SPO 1997 10 15 14 34 57 4.0 -9 678.90 -60.5 -55.8 -58.9 62 -99 SPO 1997 10 15 14 35 58 4.0 -9 678.90 -60.5 -55.9 -58.9 63 -99 SPO 1997 10 15 14 36 57 3.9 -9 678.90 -60.5 -55.9 -58.8 63 -99 SPO 1997 10 15 14 37 58 3.9 -9 678.90 -60.5 -56.0 -58.8 63 -99 SPO 1997 10 15 14 38 61 3.8 -9 678.90 -60.4 -56.1 -58.9 62 -99 SPO 1997 10 15 14 39 62 3.8 -9 678.90 -60.4 -56.1 -58.8 62 -99 SPO 1997 10 15 14 40 61 3.9 -9 678.90 -60.4 -55.8 -58.8 62 -99 SPO 1997 10 15 14 41 60 4.1 -9 678.90 -60.4 -55.5 -58.8 61 -99 SPO 1997 10 15 14 42 61 4.1 -9 678.90 -60.3 -55.3 -58.8 60 -99 SPO 1997 10 15 14 43 62 4.0 -9 678.90 -60.3 -55.2 -58.8 60 -99 SPO 1997 10 15 14 44 61 4.0 -9 678.90 -60.3 -55.5 -58.7 61 -99 SPO 1997 10 15 14 45 59 3.9 -9 678.90 -60.3 -55.4 -58.7 62 -99 SPO 1997 10 15 14 46 58 3.8 -9 679.00 -60.3 -55.2 -58.6 62 -99 SPO 1997 10 15 14 47 59 3.8 -9 679.00 -60.3 -54.7 -58.6 63 -99 SPO 1997 10 15 14 48 59 3.8 -9 679.00 -60.3 -54.5 -58.6 63 -99 SPO 1997 10 15 14 49 59 3.8 -9 678.90 -60.3 -54.2 -58.6 63 -99 SPO 1997 10 15 14 50 57 3.8 -9 678.90 -60.3 -53.8 -58.6 63 -99 SPO 1997 10 15 14 51 56 3.8 -9 678.90 -60.2 -53.7 -58.6 62 -99 SPO 1997 10 15 14 52 57 3.7 -9 678.90 -60.2 -53.7 -58.5 62 -99 SPO 1997 10 15 14 53 56 3.8 -9 678.90 -60.2 -53.8 -58.5 61 -99 SPO 1997 10 15 14 54 55 3.7 -9 678.90 -60.2 -53.7 -58.5 61 -99 SPO 1997 10 15 14 55 54 3.8 -9 678.90 -60.2 -53.6 -58.4 61 -99 SPO 1997 10 15 14 56 53 3.7 -9 678.90 -60.2 -53.6 -58.4 62 -99 SPO 1997 10 15 14 57 53 3.7 -9 678.90 -60.2 -53.5 -58.4 62 -99 SPO 1997 10 15 14 58 52 3.7 -9 678.90 -60.1 -53.4 -58.4 62 -99 SPO 1997 10 15 14 59 52 3.6 -9 678.90 -60.1 -53.4 -58.3 63 -99 SPO 1997 10 15 15 00 52 3.5 -9 678.90 -60.1 -53.4 -58.3 62 0 SPO 1997 10 15 15 01 52 3.4 -9 678.90 -60.1 -53.5 -58.2 62 -99 SPO 1997 10 15 15 02 51 3.5 -9 678.90 -60.2 -53.4 -58.2 63 -99 SPO 1997 10 15 15 03 49 3.4 -9 678.90 -60.1 -53.4 -58.2 61 -99 SPO 1997 10 15 15 04 47 3.2 -9 678.90 -60.1 -53.4 -58.1 61 -99 SPO 1997 10 15 15 05 46 3.3 -9 678.90 -60.1 -53.4 -58.0 61 -99 SPO 1997 10 15 15 06 45 3.4 -9 678.90 -60.1 -53.3 -58.0 61 -99 SPO 1997 10 15 15 07 46 3.5 -9 678.90 -60.0 -53.2 -58.0 60 -99 SPO 1997 10 15 15 08 45 3.6 -9 678.90 -60.0 -53.2 -58.0 61 -99 SPO 1997 10 15 15 09 44 3.8 -9 678.90 -59.9 -53.0 -58.0 61 -99 SPO 1997 10 15 15 10 44 3.8 -9 678.90 -59.8 -52.8 -58.0 61 -99 SPO 1997 10 15 15 11 42 3.8 -9 678.90 -59.8 -52.8 -58.0 61 -99 SPO 1997 10 15 15 12 42 3.8 -9 678.90 -59.7 -52.8 -57.9 61 -99 SPO 1997 10 15 15 13 43 3.8 -9 678.90 -59.7 -52.7 -57.9 61 -99 SPO 1997 10 15 15 14 44 3.8 -9 678.90 -59.7 -52.7 -57.9 62 -99 SPO 1997 10 15 15 15 45 3.8 -9 678.90 -59.7 -52.7 -57.9 63 -99 SPO 1997 10 15 15 16 45 3.8 -9 678.90 -59.7 -52.7 -57.9 63 -99 SPO 1997 10 15 15 17 45 3.9 -9 678.90 -59.7 -52.8 -57.9 63 -99 SPO 1997 10 15 15 18 45 4.0 -9 678.90 -59.7 -52.8 -57.9 63 -99 SPO 1997 10 15 15 19 44 4.2 -9 678.90 -59.7 -52.8 -57.9 62 -99 SPO 1997 10 15 15 20 44 4.3 -9 678.90 -59.6 -52.7 -58.0 60 -99 SPO 1997 10 15 15 21 44 4.2 -9 678.90 -59.6 -52.7 -58.0 61 -99 SPO 1997 10 15 15 22 45 4.3 -9 678.80 -59.6 -52.8 -58.0 62 -99 SPO 1997 10 15 15 23 46 4.2 -9 678.80 -59.7 -52.9 -58.0 63 -99 SPO 1997 10 15 15 24 47 4.1 -9 678.80 -59.7 -53.0 -58.0 62 -99 SPO 1997 10 15 15 25 47 4.0 -9 678.80 -59.8 -53.0 -58.1 63 -99 SPO 1997 10 15 15 26 49 4.0 -9 678.90 -59.8 -53.0 -58.1 64 -99 SPO 1997 10 15 15 27 53 3.9 -9 678.90 -59.9 -53.2 -58.1 64 -99 SPO 1997 10 15 15 28 55 3.9 -9 678.90 -59.9 -53.4 -58.2 64 -99 SPO 1997 10 15 15 29 56 3.9 -9 678.90 -59.9 -53.6 -58.2 64 -99 SPO 1997 10 15 15 30 57 4.0 -9 678.90 -60.0 -53.7 -58.3 64 -99 SPO 1997 10 15 15 31 58 3.9 -9 678.90 -60.0 -53.8 -58.3 62 -99 SPO 1997 10 15 15 32 59 3.9 -9 678.90 -60.0 -54.2 -58.3 62 -99 SPO 1997 10 15 15 33 59 3.8 -9 678.90 -60.1 -54.5 -58.4 62 -99 SPO 1997 10 15 15 34 60 3.7 -9 678.90 -60.1 -54.6 -58.4 63 -99 SPO 1997 10 15 15 35 62 3.6 -9 678.90 -60.1 -54.8 -58.3 63 -99 SPO 1997 10 15 15 36 62 3.5 -9 678.90 -60.1 -55.1 -58.4 62 -99 SPO 1997 10 15 15 37 63 3.5 -9 679.00 -60.2 -54.9 -58.4 63 -99 SPO 1997 10 15 15 38 64 3.5 -9 679.00 -60.2 -55.0 -58.4 63 -99 SPO 1997 10 15 15 39 64 3.5 -9 678.90 -60.2 -55.2 -58.3 63 -99 SPO 1997 10 15 15 40 64 3.7 -9 678.90 -60.3 -55.3 -58.4 63 -99 SPO 1997 10 15 15 41 63 3.7 -9 678.90 -60.3 -55.2 -58.4 63 -99 SPO 1997 10 15 15 42 64 3.6 -9 678.90 -60.4 -55.1 -58.5 63 -99 SPO 1997 10 15 15 43 65 3.6 -9 678.90 -60.5 -55.2 -58.4 63 -99 SPO 1997 10 15 15 44 62 3.6 -9 678.90 -60.5 -55.0 -58.4 62 -99 SPO 1997 10 15 15 45 61 3.6 -9 678.90 -60.5 -55.1 -58.5 61 -99 SPO 1997 10 15 15 46 61 3.5 -9 678.90 -60.6 -55.3 -58.6 62 -99 SPO 1997 10 15 15 47 60 3.4 -9 678.90 -60.6 -55.5 -58.6 61 -99 SPO 1997 10 15 15 48 60 3.3 -9 678.90 -60.7 -55.5 -58.6 62 -99 SPO 1997 10 15 15 49 60 3.3 -9 678.90 -60.8 -55.5 -58.6 63 -99 SPO 1997 10 15 15 50 60 3.1 -9 678.90 -60.8 -55.6 -58.5 62 -99 SPO 1997 10 15 15 51 61 3.0 -9 678.90 -60.9 -55.7 -58.4 63 -99 SPO 1997 10 15 15 52 59 3.1 -9 678.90 -61.0 -55.9 -58.4 63 -99 SPO 1997 10 15 15 53 60 3.3 -9 678.90 -61.1 -55.7 -58.4 62 -99 SPO 1997 10 15 15 54 61 3.4 -9 678.90 -61.1 -55.6 -58.5 61 -99 SPO 1997 10 15 15 55 62 3.4 -9 678.90 -61.2 -55.4 -58.6 62 -99 SPO 1997 10 15 15 56 62 3.4 -9 678.90 -61.2 -55.1 -58.6 61 -99 SPO 1997 10 15 15 57 60 3.6 -9 678.90 -61.3 -55.2 -58.7 61 -99 SPO 1997 10 15 15 58 60 3.7 -9 678.90 -61.4 -55.2 -58.8 62 -99 SPO 1997 10 15 15 59 61 3.6 -9 678.90 -61.4 -55.1 -58.8 62 -99 SPO 1997 10 15 16 00 62 3.7 -9 678.90 -61.4 -55.0 -58.9 62 0 SPO 1997 10 15 16 01 62 3.8 -9 678.90 -61.4 -55.1 -58.9 62 -99 SPO 1997 10 15 16 02 61 3.9 -9 678.90 -61.3 -55.1 -59.0 60 -99 SPO 1997 10 15 16 03 61 3.9 -9 678.90 -61.3 -55.1 -59.0 60 -99 SPO 1997 10 15 16 04 62 3.8 -9 678.90 -61.2 -55.1 -59.0 59 -99 SPO 1997 10 15 16 05 62 3.9 -9 678.90 -61.1 -55.3 -59.0 59 -99 SPO 1997 10 15 16 06 62 4.0 -9 678.90 -61.0 -55.3 -59.1 59 -99 SPO 1997 10 15 16 07 61 4.2 -9 678.90 -60.9 -55.1 -59.1 58 -99 SPO 1997 10 15 16 08 61 4.1 -9 678.90 -60.8 -55.0 -59.2 57 -99 SPO 1997 10 15 16 09 61 4.1 -9 678.90 -60.6 -55.0 -59.1 56 -99 SPO 1997 10 15 16 10 60 4.0 -9 678.90 -60.6 -55.5 -59.0 57 -99 SPO 1997 10 15 16 11 59 3.9 -9 678.90 -60.6 -55.8 -59.0 59 -99 SPO 1997 10 15 16 12 58 3.9 -9 678.90 -60.5 -55.9 -58.9 58 -99 SPO 1997 10 15 16 13 58 3.9 -9 678.90 -60.4 -55.8 -58.8 59 -99 SPO 1997 10 15 16 14 58 3.7 -9 678.90 -60.4 -55.7 -58.8 60 -99 SPO 1997 10 15 16 15 56 3.5 -9 678.90 -60.4 -56.0 -58.7 60 -99 SPO 1997 10 15 16 16 56 3.5 -9 678.90 -60.3 -56.0 -58.6 60 -99 SPO 1997 10 15 16 17 56 3.5 -9 678.90 -60.3 -55.9 -58.5 61 -99 SPO 1997 10 15 16 18 55 3.6 -9 678.90 -60.3 -55.7 -58.5 63 -99 SPO 1997 10 15 16 19 56 3.8 -9 678.90 -60.3 -55.7 -58.6 63 -99 SPO 1997 10 15 16 20 55 3.7 -9 678.90 -60.2 -55.6 -58.6 62 -99 SPO 1997 10 15 16 21 55 3.7 -9 678.90 -60.2 -55.6 -58.6 62 -99 SPO 1997 10 15 16 22 55 3.7 -9 678.90 -60.2 -55.6 -58.6 62 -99 SPO 1997 10 15 16 23 53 3.8 -9 678.90 -60.2 -55.6 -58.6 62 -99 SPO 1997 10 15 16 24 51 3.6 -9 678.90 -60.1 -55.7 -58.6 62 -99 SPO 1997 10 15 16 25 50 3.6 -9 678.90 -60.1 -55.8 -58.5 63 -99 SPO 1997 10 15 16 26 49 3.7 -9 678.90 -60.0 -55.9 -58.5 62 -99 SPO 1997 10 15 16 27 49 3.8 -9 678.90 -60.0 -55.8 -58.5 62 -99 SPO 1997 10 15 16 28 50 3.6 -9 678.90 -60.0 -55.7 -58.5 63 -99 SPO 1997 10 15 16 29 50 3.7 -9 678.90 -59.9 -55.6 -58.4 62 -99 SPO 1997 10 15 16 30 52 3.7 -9 678.90 -59.9 -55.7 -58.4 63 -99 SPO 1997 10 15 16 31 52 3.4 -9 678.90 -59.9 -55.8 -58.3 63 -99 SPO 1997 10 15 16 32 52 3.4 -9 678.90 -59.9 -55.7 -58.2 64 -99 SPO 1997 10 15 16 33 51 3.3 -9 678.90 -59.9 -55.7 -58.2 63 -99 SPO 1997 10 15 16 34 51 3.3 -9 678.90 -59.9 -55.7 -58.2 63 -99 SPO 1997 10 15 16 35 53 3.2 -9 678.90 -59.9 -55.6 -58.1 64 -99 SPO 1997 10 15 16 36 54 3.2 -9 678.90 -59.9 -55.7 -58.1 64 -99 SPO 1997 10 15 16 37 56 3.3 -9 678.90 -59.9 -55.8 -58.1 64 -99 SPO 1997 10 15 16 38 58 3.3 -9 678.90 -59.9 -55.7 -58.1 64 -99 SPO 1997 10 15 16 39 59 3.2 -9 678.90 -59.9 -55.8 -58.1 64 -99 SPO 1997 10 15 16 40 59 3.2 -9 678.90 -60.0 -55.8 -58.1 64 -99 SPO 1997 10 15 16 41 59 3.2 -9 678.90 -60.0 -55.9 -58.1 65 -99 SPO 1997 10 15 16 42 59 3.3 -9 678.90 -60.0 -56.0 -58.1 65 -99 SPO 1997 10 15 16 43 59 3.5 -9 678.90 -60.0 -55.6 -58.1 65 -99 SPO 1997 10 15 16 44 59 3.6 -9 678.90 -60.0 -55.3 -58.2 64 -99 SPO 1997 10 15 16 45 57 3.7 -9 678.90 -60.0 -55.4 -58.2 64 -99 SPO 1997 10 15 16 46 55 3.8 -9 678.90 -60.1 -55.2 -58.3 64 -99 SPO 1997 10 15 16 47 55 3.7 -9 678.90 -60.0 -55.0 -58.2 63 -99 SPO 1997 10 15 16 48 55 3.7 -9 679.00 -60.0 -55.1 -58.2 63 -99 SPO 1997 10 15 16 49 57 3.8 -9 679.00 -60.0 -54.8 -58.2 64 -99 SPO 1997 10 15 16 50 59 3.6 -9 679.00 -59.9 -54.6 -58.2 64 -99 SPO 1997 10 15 16 51 61 3.5 -9 679.00 -59.9 -55.0 -58.2 64 -99 SPO 1997 10 15 16 52 61 3.5 -9 679.00 -60.0 -55.6 -58.2 65 -99 SPO 1997 10 15 16 53 61 3.4 -9 679.00 -60.1 -55.8 -58.1 66 -99 SPO 1997 10 15 16 54 62 3.3 -9 679.00 -60.1 -55.8 -58.0 65 -99 SPO 1997 10 15 16 55 62 3.4 -9 679.00 -60.2 -55.8 -58.0 65 -99 SPO 1997 10 15 16 56 63 3.3 -9 678.90 -60.2 -55.8 -58.0 64 -99 SPO 1997 10 15 16 57 64 3.4 -9 679.00 -60.4 -56.0 -58.0 65 -99 SPO 1997 10 15 16 58 65 3.4 -9 679.00 -60.4 -55.4 -58.0 64 -99 SPO 1997 10 15 16 59 65 3.1 -9 679.00 -60.6 -55.7 -58.1 65 -99 SPO 1997 10 15 17 00 64 3.0 -9 679.00 -60.7 -56.4 -58.0 64 0 SPO 1997 10 15 17 01 64 3.2 -9 679.00 -60.7 -56.3 -58.1 63 -99 SPO 1997 10 15 17 02 62 3.0 -9 679.00 -60.8 -56.5 -58.1 64 -99 SPO 1997 10 15 17 03 62 3.2 -9 679.00 -61.0 -56.5 -58.1 65 -99 SPO 1997 10 15 17 04 61 3.4 -9 679.00 -61.0 -56.4 -58.1 64 -99 SPO 1997 10 15 17 05 61 3.4 -9 679.00 -61.0 -56.2 -58.2 64 -99 SPO 1997 10 15 17 06 62 3.5 -9 679.00 -61.0 -56.0 -58.2 64 -99 SPO 1997 10 15 17 07 63 3.5 -9 679.00 -61.1 -55.8 -58.3 65 -99 SPO 1997 10 15 17 08 62 3.4 -9 679.00 -61.2 -55.9 -58.4 65 -99 SPO 1997 10 15 17 09 61 3.4 -9 679.00 -61.2 -55.9 -58.5 63 -99 SPO 1997 10 15 17 10 61 3.5 -9 679.00 -61.3 -56.0 -58.5 63 -99 SPO 1997 10 15 17 11 60 3.8 -9 679.00 -61.3 -55.7 -58.5 63 -99 SPO 1997 10 15 17 12 60 3.8 -9 679.00 -61.3 -55.6 -58.5 62 -99 SPO 1997 10 15 17 13 62 3.6 -9 679.00 -61.3 -55.6 -58.6 62 -99 SPO 1997 10 15 17 14 63 3.5 -9 679.00 -61.4 -55.8 -58.8 63 -99 SPO 1997 10 15 17 15 63 3.4 -9 679.00 -61.4 -55.9 -58.8 63 -99 SPO 1997 10 15 17 16 64 3.4 -9 679.00 -61.3 -56.0 -58.7 62 -99 SPO 1997 10 15 17 17 64 3.3 -9 679.00 -61.2 -56.2 -58.7 61 -99 SPO 1997 10 15 17 18 63 3.4 -9 679.00 -61.2 -56.2 -58.6 62 -99 SPO 1997 10 15 17 19 62 3.3 -9 679.00 -61.3 -55.9 -58.6 62 -99 SPO 1997 10 15 17 20 61 3.3 -9 679.00 -61.4 -55.8 -58.6 62 -99 SPO 1997 10 15 17 21 62 3.3 -9 679.10 -61.5 -55.7 -58.6 62 -99 SPO 1997 10 15 17 22 62 3.2 -9 679.10 -61.4 -55.8 -58.6 61 -99 SPO 1997 10 15 17 23 63 3.3 -9 679.10 -61.4 -55.9 -58.6 61 -99 SPO 1997 10 15 17 24 63 3.6 -9 679.00 -61.3 -55.8 -58.6 59 -99 SPO 1997 10 15 17 25 62 3.7 -9 679.00 -61.3 -55.5 -58.7 61 -99 SPO 1997 10 15 17 26 61 3.7 -9 679.00 -61.4 -55.5 -58.7 62 -99 SPO 1997 10 15 17 27 61 3.9 -9 679.00 -61.4 -55.6 -58.7 62 -99 SPO 1997 10 15 17 28 62 4.0 -9 678.90 -61.4 -55.6 -58.7 62 -99 SPO 1997 10 15 17 29 62 3.9 -9 678.90 -61.3 -55.7 -58.8 61 -99 SPO 1997 10 15 17 30 64 3.8 -9 678.90 -61.4 -55.8 -58.8 62 -99 SPO 1997 10 15 17 31 63 3.8 -9 678.90 -61.5 -55.9 -58.8 63 -99 SPO 1997 10 15 17 32 61 3.9 -9 678.90 -61.5 -55.8 -58.8 63 -99 SPO 1997 10 15 17 33 60 3.9 -9 678.90 -61.4 -55.8 -58.9 62 -99 SPO 1997 10 15 17 34 62 4.0 -9 678.90 -61.4 -55.8 -58.9 62 -99 SPO 1997 10 15 17 35 62 4.1 -9 678.90 -61.3 -56.0 -58.9 62 -99 SPO 1997 10 15 17 36 61 4.0 -9 678.90 -61.2 -56.2 -59.0 61 -99 SPO 1997 10 15 17 37 61 4.0 -9 678.90 -61.2 -56.4 -59.0 61 -99 SPO 1997 10 15 17 38 60 4.0 -9 678.90 -61.0 -56.5 -59.0 60 -99 SPO 1997 10 15 17 39 60 4.0 -9 678.90 -61.0 -56.6 -59.0 61 -99 SPO 1997 10 15 17 40 59 4.0 -9 678.90 -60.9 -56.6 -58.9 62 -99 SPO 1997 10 15 17 41 61 4.0 -9 678.90 -60.8 -56.6 -58.9 61 -99 SPO 1997 10 15 17 42 63 3.9 -9 678.90 -60.6 -56.8 -58.8 60 -99 SPO 1997 10 15 17 43 63 3.8 -9 678.90 -60.6 -56.9 -58.8 62 -99 SPO 1997 10 15 17 44 63 3.8 -9 678.90 -60.6 -57.0 -58.7 63 -99 SPO 1997 10 15 17 45 63 3.9 -9 678.80 -60.5 -56.9 -58.7 63 -99 SPO 1997 10 15 17 46 64 4.0 -9 678.80 -60.5 -56.9 -58.8 64 -99 SPO 1997 10 15 17 47 64 3.9 -9 678.90 -60.5 -56.9 -58.7 64 -99 SPO 1997 10 15 17 48 64 3.9 -9 678.90 -60.6 -57.0 -58.7 65 -99 SPO 1997 10 15 17 49 65 3.7 -9 678.90 -60.5 -57.0 -58.6 64 -99 SPO 1997 10 15 17 50 66 3.8 -9 678.90 -60.6 -57.0 -58.6 64 -99 SPO 1997 10 15 17 51 66 4.0 -9 678.90 -60.5 -57.0 -58.6 63 -99 SPO 1997 10 15 17 52 66 4.0 -9 678.90 -60.5 -56.8 -58.6 63 -99 SPO 1997 10 15 17 53 64 4.0 -9 678.90 -60.6 -56.7 -58.6 64 -99 SPO 1997 10 15 17 54 62 4.0 -9 678.80 -60.6 -56.5 -58.7 64 -99 SPO 1997 10 15 17 55 61 4.4 -9 678.80 -60.6 -56.2 -58.7 65 -99 SPO 1997 10 15 17 56 62 4.3 -9 678.80 -60.4 -55.9 -58.8 63 -99 SPO 1997 10 15 17 57 62 4.3 -9 678.80 -60.4 -55.7 -58.7 64 -99 SPO 1997 10 15 17 58 62 4.1 -9 678.80 -60.3 -55.6 -58.7 63 -99 SPO 1997 10 15 17 59 60 4.2 -9 678.80 -60.3 -55.6 -58.7 63 -99 SPO 1997 10 15 18 00 58 4.1 -9 678.80 -60.2 -55.5 -58.6 63 0 SPO 1997 10 15 18 01 57 4.0 -9 678.80 -60.2 -55.5 -58.6 63 -99 SPO 1997 10 15 18 02 55 4.1 -9 678.90 -60.2 -55.4 -58.6 64 -99 SPO 1997 10 15 18 03 54 4.1 -9 678.90 -60.2 -55.2 -58.6 64 -99 SPO 1997 10 15 18 04 54 4.1 -9 678.80 -60.1 -55.0 -58.6 64 -99 SPO 1997 10 15 18 05 54 4.2 -9 678.80 -60.1 -55.0 -58.6 64 -99 SPO 1997 10 15 18 06 53 4.1 -9 678.80 -60.1 -54.9 -58.5 65 -99 SPO 1997 10 15 18 07 52 4.2 -9 678.80 -60.0 -54.9 -58.5 65 -99 SPO 1997 10 15 18 08 51 4.3 -9 678.80 -60.0 -54.8 -58.5 66 -99 SPO 1997 10 15 18 09 50 4.3 -9 678.80 -60.0 -54.6 -58.5 67 -99 SPO 1997 10 15 18 10 49 4.4 -9 678.80 -60.0 -54.5 -58.5 67 -99 SPO 1997 10 15 18 11 49 4.4 -9 678.80 -59.9 -54.5 -58.5 66 -99 SPO 1997 10 15 18 12 48 4.4 -9 678.80 -59.8 -54.4 -58.4 65 -99 SPO 1997 10 15 18 13 48 4.3 -9 678.80 -59.8 -54.4 -58.4 65 -99 SPO 1997 10 15 18 14 49 4.3 -9 678.80 -59.7 -54.4 -58.4 64 -99 SPO 1997 10 15 18 15 50 4.4 -9 678.80 -59.6 -54.4 -58.3 64 -99 SPO 1997 10 15 18 16 50 4.6 -9 678.80 -59.6 -54.4 -58.3 64 -99 SPO 1997 10 15 18 17 50 4.6 -9 678.80 -59.6 -54.3 -58.3 64 -99 SPO 1997 10 15 18 18 48 4.6 -9 678.80 -59.6 -54.3 -58.3 64 -99 SPO 1997 10 15 18 19 48 4.6 -9 678.80 -59.5 -54.3 -58.3 64 -99 SPO 1997 10 15 18 20 48 4.5 -9 678.80 -59.6 -54.4 -58.2 66 -99 SPO 1997 10 15 18 21 48 4.5 -9 678.80 -59.5 -54.4 -58.2 66 -99 SPO 1997 10 15 18 22 48 4.5 -9 678.80 -59.5 -54.3 -58.2 66 -99 SPO 1997 10 15 18 23 49 4.6 -9 678.80 -59.5 -54.2 -58.2 66 -99 SPO 1997 10 15 18 24 50 4.5 -9 678.80 -59.5 -54.2 -58.2 65 -99 SPO 1997 10 15 18 25 50 4.5 -9 678.80 -59.4 -54.2 -58.2 65 -99 SPO 1997 10 15 18 26 50 4.3 -9 678.80 -59.5 -54.3 -58.1 64 -99 SPO 1997 10 15 18 27 50 4.3 -9 678.80 -59.5 -54.3 -58.1 64 -99 SPO 1997 10 15 18 28 50 4.3 -9 678.80 -59.4 -54.3 -58.1 65 -99 SPO 1997 10 15 18 29 49 4.3 -9 678.80 -59.4 -54.3 -58.1 65 -99 SPO 1997 10 15 18 30 49 4.3 -9 678.80 -59.4 -54.2 -58.1 66 -99 SPO 1997 10 15 18 31 50 4.3 -9 678.80 -59.4 -54.3 -58.1 67 -99 SPO 1997 10 15 18 32 50 4.3 -9 678.80 -59.4 -54.5 -58.1 67 -99 SPO 1997 10 15 18 33 50 4.3 -9 678.80 -59.4 -54.7 -58.1 67 -99 SPO 1997 10 15 18 34 51 4.3 -9 678.80 -59.4 -54.9 -58.1 67 -99 SPO 1997 10 15 18 35 51 4.3 -9 678.80 -59.4 -55.0 -58.1 66 -99 SPO 1997 10 15 18 36 50 4.3 -9 678.80 -59.4 -54.8 -58.1 65 -99 SPO 1997 10 15 18 37 49 4.2 -9 678.80 -59.4 -54.8 -58.1 65 -99 SPO 1997 10 15 18 38 49 4.2 -9 678.80 -59.4 -54.9 -58.1 65 -99 SPO 1997 10 15 18 39 49 4.2 -9 678.80 -59.4 -54.9 -58.1 65 -99 SPO 1997 10 15 18 40 49 4.3 -9 678.80 -59.4 -54.9 -58.1 65 -99 SPO 1997 10 15 18 41 48 4.2 -9 678.80 -59.5 -55.1 -58.1 67 -99 SPO 1997 10 15 18 42 47 4.1 -9 678.90 -59.5 -55.4 -58.1 67 -99 SPO 1997 10 15 18 43 48 4.2 -9 678.90 -59.4 -55.7 -58.1 66 -99 SPO 1997 10 15 18 44 47 4.4 -9 678.80 -59.4 -55.6 -58.1 66 -99 SPO 1997 10 15 18 45 46 4.3 -9 678.80 -59.4 -55.7 -58.1 66 -99 SPO 1997 10 15 18 46 44 4.2 -9 678.90 -59.4 -55.8 -58.1 66 -99 SPO 1997 10 15 18 47 44 4.3 -9 678.80 -59.4 -55.8 -58.1 66 -99 SPO 1997 10 15 18 48 44 4.3 -9 678.80 -59.4 -55.8 -58.1 66 -99 SPO 1997 10 15 18 49 44 4.2 -9 678.80 -59.3 -55.9 -58.1 65 -99 SPO 1997 10 15 18 50 44 4.2 -9 678.90 -59.3 -56.0 -58.1 65 -99 SPO 1997 10 15 18 51 45 4.3 -9 678.90 -59.3 -56.0 -58.1 66 -99 SPO 1997 10 15 18 52 45 4.4 -9 678.90 -59.3 -56.0 -58.0 66 -99 SPO 1997 10 15 18 53 45 4.5 -9 678.90 -59.3 -56.0 -58.0 66 -99 SPO 1997 10 15 18 54 46 4.6 -9 678.90 -59.2 -56.0 -58.1 65 -99 SPO 1997 10 15 18 55 46 4.5 -9 678.90 -59.3 -56.0 -58.1 67 -99 SPO 1997 10 15 18 56 47 4.7 -9 678.80 -59.4 -56.0 -58.1 68 -99 SPO 1997 10 15 18 57 46 4.8 -9 678.80 -59.3 -56.0 -58.1 67 -99 SPO 1997 10 15 18 58 45 4.7 -9 678.80 -59.4 -56.0 -58.1 67 -99 SPO 1997 10 15 18 59 45 4.7 -9 678.80 -59.4 -56.0 -58.2 66 -99 SPO 1997 10 15 19 00 46 4.7 -9 678.80 -59.4 -56.0 -58.2 66 0 SPO 1997 10 15 19 01 46 4.7 -9 678.80 -59.4 -55.9 -58.2 65 -99 SPO 1997 10 15 19 02 46 4.6 -9 678.80 -59.4 -55.9 -58.2 65 -99 SPO 1997 10 15 19 03 48 4.7 -9 678.80 -59.4 -56.0 -58.2 65 -99 SPO 1997 10 15 19 04 50 4.5 -9 678.80 -59.5 -55.9 -58.2 66 -99 SPO 1997 10 15 19 05 50 4.4 -9 678.80 -59.6 -56.0 -58.2 67 -99 SPO 1997 10 15 19 06 51 4.3 -9 678.80 -59.6 -56.0 -58.3 67 -99 SPO 1997 10 15 19 07 50 4.2 -9 678.80 -59.7 -56.2 -58.3 67 -99 SPO 1997 10 15 19 08 49 4.1 -9 678.80 -59.7 -56.3 -58.3 67 -99 SPO 1997 10 15 19 09 48 3.8 -9 678.80 -59.7 -56.3 -58.3 66 -99 SPO 1997 10 15 19 10 49 3.8 -9 678.80 -59.7 -56.4 -58.2 66 -99 SPO 1997 10 15 19 11 50 4.0 -9 678.80 -59.8 -56.4 -58.2 65 -99 SPO 1997 10 15 19 12 49 3.9 -9 678.80 -59.8 -56.4 -58.3 64 -99 SPO 1997 10 15 19 13 49 3.9 -9 678.80 -59.8 -56.4 -58.3 64 -99 SPO 1997 10 15 19 14 49 3.8 -9 678.80 -59.8 -56.4 -58.2 64 -99 SPO 1997 10 15 19 15 49 3.8 -9 678.80 -59.8 -56.4 -58.3 64 -99 SPO 1997 10 15 19 16 48 3.9 -9 678.80 -59.9 -56.5 -58.3 65 -99 SPO 1997 10 15 19 17 48 4.0 -9 678.80 -59.9 -56.4 -58.3 64 -99 SPO 1997 10 15 19 18 48 4.0 -9 678.80 -60.0 -56.3 -58.3 65 -99 SPO 1997 10 15 19 19 48 3.9 -9 678.80 -60.0 -56.3 -58.3 65 -99 SPO 1997 10 15 19 20 48 3.8 -9 678.80 -60.0 -56.2 -58.3 65 -99 SPO 1997 10 15 19 21 48 3.8 -9 678.80 -60.0 -56.2 -58.3 64 -99 SPO 1997 10 15 19 22 48 3.9 -9 678.80 -60.0 -56.2 -58.3 64 -99 SPO 1997 10 15 19 23 49 3.9 -9 678.80 -60.1 -56.1 -58.4 64 -99 SPO 1997 10 15 19 24 50 3.9 -9 678.80 -60.1 -56.1 -58.4 64 -99 SPO 1997 10 15 19 25 50 4.0 -9 678.80 -60.1 -56.1 -58.4 64 -99 SPO 1997 10 15 19 26 50 3.9 -9 678.80 -60.1 -56.2 -58.5 64 -99 SPO 1997 10 15 19 27 51 3.9 -9 678.90 -60.1 -56.2 -58.5 64 -99 SPO 1997 10 15 19 28 52 3.9 -9 678.90 -60.2 -56.3 -58.5 64 -99 SPO 1997 10 15 19 29 54 3.9 -9 678.80 -60.2 -56.2 -58.5 64 -99 SPO 1997 10 15 19 30 55 4.0 -9 678.80 -60.2 -56.1 -58.6 64 -99 SPO 1997 10 15 19 31 55 4.0 -9 678.80 -60.3 -56.1 -58.6 65 -99 SPO 1997 10 15 19 32 56 4.0 -9 678.80 -60.3 -56.2 -58.7 65 -99 SPO 1997 10 15 19 33 56 4.1 -9 678.80 -60.4 -56.4 -58.7 65 -99 SPO 1997 10 15 19 34 56 4.1 -9 678.80 -60.4 -56.3 -58.8 64 -99 SPO 1997 10 15 19 35 57 4.2 -9 678.80 -60.4 -56.3 -58.8 63 -99 SPO 1997 10 15 19 36 57 4.1 -9 678.80 -60.4 -56.4 -58.9 63 -99 SPO 1997 10 15 19 37 56 4.1 -9 678.80 -60.4 -56.4 -58.9 63 -99 SPO 1997 10 15 19 38 56 4.0 -9 678.80 -60.4 -56.4 -58.9 63 -99 SPO 1997 10 15 19 39 57 4.0 -9 678.80 -60.4 -56.6 -58.9 63 -99 SPO 1997 10 15 19 40 59 4.0 -9 678.80 -60.4 -56.6 -59.0 63 -99 SPO 1997 10 15 19 41 60 4.1 -9 678.80 -60.4 -56.7 -59.0 62 -99 SPO 1997 10 15 19 42 60 4.3 -9 678.80 -60.5 -56.8 -59.1 63 -99 SPO 1997 10 15 19 43 59 4.4 -9 678.80 -60.5 -56.7 -59.2 63 -99 SPO 1997 10 15 19 44 57 4.4 -9 678.80 -60.5 -56.7 -59.2 63 -99 SPO 1997 10 15 19 45 56 4.4 -9 678.80 -60.5 -56.6 -59.2 62 -99 SPO 1997 10 15 19 46 56 4.5 -9 678.80 -60.5 -56.6 -59.2 61 -99 SPO 1997 10 15 19 47 57 4.3 -9 678.80 -60.5 -56.6 -59.2 61 -99 SPO 1997 10 15 19 48 58 4.1 -9 678.80 -60.6 -56.7 -59.2 61 -99 SPO 1997 10 15 19 49 58 4.0 -9 678.80 -60.6 -56.8 -59.2 61 -99 SPO 1997 10 15 19 50 58 3.9 -9 678.80 -60.6 -56.9 -59.2 62 -99 SPO 1997 10 15 19 51 60 3.8 -9 678.80 -60.6 -56.9 -59.2 63 -99 SPO 1997 10 15 19 52 61 3.8 -9 678.80 -60.7 -56.9 -59.2 64 -99 SPO 1997 10 15 19 53 62 3.9 -9 678.80 -60.7 -57.0 -59.1 64 -99 SPO 1997 10 15 19 54 62 4.0 -9 678.80 -60.8 -57.0 -59.2 65 -99 SPO 1997 10 15 19 55 61 4.0 -9 678.80 -60.8 -57.1 -59.2 65 -99 SPO 1997 10 15 19 56 60 4.1 -9 678.80 -60.8 -57.1 -59.2 65 -99 SPO 1997 10 15 19 57 61 4.1 -9 678.80 -60.8 -57.1 -59.3 65 -99 SPO 1997 10 15 19 58 60 4.1 -9 678.80 -60.8 -57.0 -59.3 65 -99 SPO 1997 10 15 19 59 60 4.1 -9 678.80 -60.8 -56.9 -59.3 65 -99 SPO 1997 10 15 20 00 62 4.1 -9 678.80 -60.9 -56.9 -59.3 65 0 SPO 1997 10 15 20 01 63 4.1 -9 678.80 -60.9 -56.8 -59.3 65 -99 SPO 1997 10 15 20 02 64 4.0 -9 678.80 -60.9 -56.9 -59.2 65 -99 SPO 1997 10 15 20 03 64 4.2 -9 678.80 -60.9 -56.7 -59.2 66 -99 SPO 1997 10 15 20 04 64 4.2 -9 678.80 -61.0 -56.7 -59.3 67 -99 SPO 1997 10 15 20 05 63 4.2 -9 678.70 -61.0 -56.8 -59.4 67 -99 SPO 1997 10 15 20 06 60 4.1 -9 678.70 -61.1 -56.9 -59.5 67 -99 SPO 1997 10 15 20 07 58 4.0 -9 678.70 -61.1 -56.9 -59.5 67 -99 SPO 1997 10 15 20 08 58 3.8 -9 678.70 -61.2 -56.8 -59.5 68 -99 SPO 1997 10 15 20 09 58 3.7 -9 678.70 -61.2 -56.7 -59.5 68 -99 SPO 1997 10 15 20 10 57 3.8 -9 678.70 -61.2 -56.8 -59.4 67 -99 SPO 1997 10 15 20 11 55 3.8 -9 678.70 -61.2 -56.8 -59.4 67 -99 SPO 1997 10 15 20 12 53 3.8 -9 678.80 -61.2 -56.9 -59.4 67 -99 SPO 1997 10 15 20 13 52 3.8 -9 678.80 -61.1 -56.9 -59.4 67 -99 SPO 1997 10 15 20 14 52 3.7 -9 678.70 -61.1 -56.9 -59.4 67 -99 SPO 1997 10 15 20 15 51 3.7 -9 678.70 -61.1 -56.9 -59.4 67 -99 SPO 1997 10 15 20 16 50 3.7 -9 678.70 -61.1 -56.8 -59.4 68 -99 SPO 1997 10 15 20 17 49 3.6 -9 678.70 -61.0 -56.8 -59.4 68 -99 SPO 1997 10 15 20 18 50 3.6 -9 678.70 -61.0 -57.0 -59.4 67 -99 SPO 1997 10 15 20 19 52 3.8 -9 678.70 -60.9 -57.0 -59.4 66 -99 SPO 1997 10 15 20 20 54 3.8 -9 678.60 -60.9 -57.1 -59.4 67 -99 SPO 1997 10 15 20 21 55 3.8 -9 678.60 -60.9 -57.1 -59.4 66 -99 SPO 1997 10 15 20 22 57 3.8 -9 678.60 -60.9 -57.0 -59.4 66 -99 SPO 1997 10 15 20 23 59 4.0 -9 678.60 -60.9 -57.0 -59.4 66 -99 SPO 1997 10 15 20 24 59 4.0 -9 678.50 -60.9 -57.0 -59.4 66 -99 SPO 1997 10 15 20 25 58 3.9 -9 678.60 -61.0 -56.8 -59.4 67 -99 SPO 1997 10 15 20 26 60 3.9 -9 678.60 -60.9 -56.6 -59.4 66 -99 SPO 1997 10 15 20 27 61 3.9 -9 678.60 -60.9 -56.6 -59.4 67 -99 SPO 1997 10 15 20 28 60 4.0 -9 678.50 -60.9 -56.6 -59.4 67 -99 SPO 1997 10 15 20 29 61 4.1 -9 678.50 -60.9 -56.6 -59.5 68 -99 SPO 1997 10 15 20 30 61 4.2 -9 678.50 -60.9 -56.5 -59.6 68 -99 SPO 1997 10 15 20 31 60 4.1 -9 678.50 -60.8 -56.5 -59.5 67 -99 SPO 1997 10 15 20 32 61 4.0 -9 678.50 -60.8 -56.5 -59.5 68 -99 SPO 1997 10 15 20 33 63 4.1 -9 678.50 -60.8 -56.4 -59.6 67 -99 SPO 1997 10 15 20 34 63 4.2 -9 678.50 -60.8 -56.3 -59.6 66 -99 SPO 1997 10 15 20 35 64 4.1 -9 678.50 -60.8 -56.4 -59.6 66 -99 SPO 1997 10 15 20 36 65 4.0 -9 678.50 -60.8 -56.5 -59.6 66 -99 SPO 1997 10 15 20 37 65 4.0 -9 678.50 -60.8 -56.6 -59.6 66 -99 SPO 1997 10 15 20 38 65 3.9 -9 678.50 -60.8 -56.6 -59.6 66 -99 SPO 1997 10 15 20 39 64 3.8 -9 678.50 -60.8 -56.7 -59.6 67 -99 SPO 1997 10 15 20 40 65 3.9 -9 678.60 -60.8 -56.8 -59.6 67 -99 SPO 1997 10 15 20 41 65 3.9 -9 678.60 -60.8 -57.0 -59.6 68 -99 SPO 1997 10 15 20 42 64 3.8 -9 678.60 -60.8 -57.0 -59.6 68 -99 SPO 1997 10 15 20 43 63 3.7 -9 678.70 -60.8 -57.0 -59.6 68 -99 SPO 1997 10 15 20 44 62 3.7 -9 678.70 -60.8 -57.0 -59.6 68 -99 SPO 1997 10 15 20 45 62 3.8 -9 678.70 -60.8 -57.1 -59.6 68 -99 SPO 1997 10 15 20 46 62 3.9 -9 678.70 -60.8 -57.1 -59.6 67 -99 SPO 1997 10 15 20 47 62 4.1 -9 678.70 -60.7 -57.0 -59.6 67 -99 SPO 1997 10 15 20 48 63 4.1 -9 678.70 -60.7 -56.8 -59.6 66 -99 SPO 1997 10 15 20 49 63 4.2 -9 678.70 -60.7 -56.8 -59.6 67 -99 SPO 1997 10 15 20 50 63 4.3 -9 678.70 -60.7 -56.7 -59.6 67 -99 SPO 1997 10 15 20 51 64 4.2 -9 678.60 -60.7 -56.7 -59.6 68 -99 SPO 1997 10 15 20 52 64 4.0 -9 678.70 -60.7 -56.8 -59.6 68 -99 SPO 1997 10 15 20 53 64 3.9 -9 678.70 -60.6 -56.9 -59.6 67 -99 SPO 1997 10 15 20 54 63 3.9 -9 678.70 -60.6 -57.0 -59.5 67 -99 SPO 1997 10 15 20 55 63 4.0 -9 678.70 -60.6 -57.0 -59.5 67 -99 SPO 1997 10 15 20 56 63 4.2 -9 678.70 -60.6 -57.0 -59.6 68 -99 SPO 1997 10 15 20 57 63 4.2 -9 678.70 -60.6 -56.9 -59.6 68 -99 SPO 1997 10 15 20 58 62 4.2 -9 678.70 -60.6 -56.8 -59.6 67 -99 SPO 1997 10 15 20 59 62 4.2 -9 678.70 -60.6 -56.8 -59.6 67 -99 SPO 1997 10 15 21 00 62 4.2 -9 678.70 -60.6 -56.9 -59.6 67 0 SPO 1997 10 15 21 01 63 4.2 -9 678.70 -60.6 -56.9 -59.6 67 -99 SPO 1997 10 15 21 02 62 4.3 -9 678.70 -60.6 -56.8 -59.6 67 -99 SPO 1997 10 15 21 03 61 4.2 -9 678.70 -60.6 -56.8 -59.6 67 -99 SPO 1997 10 15 21 04 60 4.1 -9 678.70 -60.6 -56.8 -59.6 67 -99 SPO 1997 10 15 21 05 59 3.9 -9 678.70 -60.6 -56.9 -59.6 67 -99 SPO 1997 10 15 21 06 59 3.9 -9 678.70 -60.6 -56.9 -59.6 67 -99 SPO 1997 10 15 21 07 61 3.9 -9 678.70 -60.6 -56.9 -59.5 67 -99 SPO 1997 10 15 21 08 62 4.0 -9 678.70 -60.6 -57.2 -59.6 68 -99 SPO 1997 10 15 21 09 64 4.2 -9 678.70 -60.6 -57.1 -59.6 67 -99 SPO 1997 10 15 21 10 64 4.1 -9 678.70 -60.5 -57.1 -59.6 65 -99 SPO 1997 10 15 21 11 62 3.8 -9 678.70 -60.5 -57.2 -59.6 64 -99 SPO 1997 10 15 21 12 62 4.0 -9 678.70 -60.6 -57.3 -59.5 65 -99 SPO 1997 10 15 21 13 60 3.8 -9 678.70 -60.6 -57.4 -59.5 66 -99 SPO 1997 10 15 21 14 60 3.9 -9 678.70 -60.6 -57.6 -59.5 66 -99 SPO 1997 10 15 21 15 60 4.0 -9 678.70 -60.6 -57.6 -59.5 66 -99 SPO 1997 10 15 21 16 59 3.9 -9 678.70 -60.5 -57.5 -59.5 66 -99 SPO 1997 10 15 21 17 59 4.0 -9 678.70 -60.5 -57.5 -59.5 66 -99 SPO 1997 10 15 21 18 61 4.2 -9 678.70 -60.5 -57.5 -59.5 67 -99 SPO 1997 10 15 21 19 62 4.2 -9 678.70 -60.5 -57.4 -59.5 67 -99 SPO 1997 10 15 21 20 61 4.1 -9 678.70 -60.5 -57.4 -59.5 67 -99 SPO 1997 10 15 21 21 60 4.1 -9 678.70 -60.5 -57.5 -59.5 66 -99 SPO 1997 10 15 21 22 58 4.1 -9 678.70 -60.5 -57.5 -59.5 66 -99 SPO 1997 10 15 21 23 58 4.0 -9 678.70 -60.5 -57.3 -59.5 66 -99 SPO 1997 10 15 21 24 58 4.0 -9 678.70 -60.5 -57.4 -59.6 65 -99 SPO 1997 10 15 21 25 57 4.1 -9 678.70 -60.5 -57.3 -59.6 66 -99 SPO 1997 10 15 21 26 57 4.2 -9 678.70 -60.5 -57.2 -59.6 66 -99 SPO 1997 10 15 21 27 56 4.3 -9 678.70 -60.5 -57.4 -59.7 65 -99 SPO 1997 10 15 21 28 56 4.3 -9 678.70 -60.6 -57.4 -59.7 67 -99 SPO 1997 10 15 21 29 55 4.2 -9 678.70 -60.5 -57.2 -59.7 66 -99 SPO 1997 10 15 21 30 56 4.2 -9 678.70 -60.6 -57.2 -59.8 67 -99 SPO 1997 10 15 21 31 55 4.2 -9 678.70 -60.6 -57.3 -59.7 67 -99 SPO 1997 10 15 21 32 54 4.1 -9 678.70 -60.5 -57.2 -59.8 66 -99 SPO 1997 10 15 21 33 54 4.1 -9 678.70 -60.5 -57.2 -59.7 67 -99 SPO 1997 10 15 21 34 55 4.2 -9 678.70 -60.5 -57.1 -59.7 67 -99 SPO 1997 10 15 21 35 55 4.2 -9 678.70 -60.5 -57.0 -59.8 67 -99 SPO 1997 10 15 21 36 55 4.1 -9 678.70 -60.5 -57.0 -59.8 67 -99 SPO 1997 10 15 21 37 55 4.0 -9 678.70 -60.5 -57.0 -59.7 68 -99 SPO 1997 10 15 21 38 55 4.0 -9 678.70 -60.5 -57.1 -59.7 68 -99 SPO 1997 10 15 21 39 56 4.1 -9 678.70 -60.5 -57.2 -59.7 68 -99 SPO 1997 10 15 21 40 57 4.3 -9 678.70 -60.5 -57.1 -59.7 68 -99 SPO 1997 10 15 21 41 58 4.3 -9 678.70 -60.4 -57.1 -59.7 67 -99 SPO 1997 10 15 21 42 58 4.3 -9 678.70 -60.4 -57.0 -59.7 67 -99 SPO 1997 10 15 21 43 58 4.4 -9 678.70 -60.4 -57.0 -59.6 66 -99 SPO 1997 10 15 21 44 58 4.5 -9 678.70 -60.4 -57.2 -59.6 65 -99 SPO 1997 10 15 21 45 58 4.5 -9 678.70 -60.4 -57.2 -59.6 65 -99 SPO 1997 10 15 21 46 57 4.4 -9 678.70 -60.4 -57.2 -59.7 66 -99 SPO 1997 10 15 21 47 55 4.4 -9 678.80 -60.4 -57.2 -59.6 66 -99 SPO 1997 10 15 21 48 54 4.2 -9 678.80 -60.4 -57.1 -59.6 66 -99 SPO 1997 10 15 21 49 54 4.1 -9 678.80 -60.4 -57.1 -59.6 67 -99 SPO 1997 10 15 21 50 53 4.0 -9 678.80 -60.3 -57.0 -59.6 67 -99 SPO 1997 10 15 21 51 53 4.1 -9 678.80 -60.3 -57.0 -59.6 68 -99 SPO 1997 10 15 21 52 53 4.2 -9 678.80 -60.3 -56.8 -59.7 68 -99 SPO 1997 10 15 21 53 54 4.3 -9 678.80 -60.3 -56.7 -59.7 68 -99 SPO 1997 10 15 21 54 53 4.2 -9 678.80 -60.3 -56.8 -59.6 69 -99 SPO 1997 10 15 21 55 53 4.3 -9 678.80 -60.3 -56.7 -59.6 69 -99 SPO 1997 10 15 21 56 51 4.3 -9 678.80 -60.3 -56.6 -59.4 69 -99 SPO 1997 10 15 21 57 49 4.1 -9 678.80 -60.2 -56.6 -59.4 67 -99 SPO 1997 10 15 21 58 49 4.0 -9 678.80 -60.2 -56.7 -59.4 67 -99 SPO 1997 10 15 21 59 47 4.0 -9 678.80 -60.2 -56.7 -59.3 67 -99 SPO 1997 10 15 22 00 46 4.0 -9 678.80 -60.2 -56.7 -59.2 68 0 SPO 1997 10 15 22 01 47 4.0 -9 678.80 -60.2 -56.7 -59.2 68 -99 SPO 1997 10 15 22 02 48 3.8 -9 678.80 -60.2 -56.7 -59.1 68 -99 SPO 1997 10 15 22 03 48 3.7 -9 678.80 -60.2 -56.9 -59.0 69 -99 SPO 1997 10 15 22 04 48 3.6 -9 678.80 -60.2 -57.0 -59.0 69 -99 SPO 1997 10 15 22 05 51 3.5 -9 678.80 -60.3 -57.0 -58.9 69 -99 SPO 1997 10 15 22 06 52 3.4 -9 678.80 -60.3 -57.1 -58.9 69 -99 SPO 1997 10 15 22 07 51 3.4 -9 678.80 -60.3 -57.1 -58.9 68 -99 SPO 1997 10 15 22 08 51 3.4 -9 678.80 -60.3 -57.0 -58.8 68 -99 SPO 1997 10 15 22 09 51 3.4 -9 678.80 -60.3 -57.0 -58.8 67 -99 SPO 1997 10 15 22 10 50 3.5 -9 678.80 -60.3 -57.0 -58.8 67 -99 SPO 1997 10 15 22 11 49 3.5 -9 678.80 -60.3 -57.0 -58.8 67 -99 SPO 1997 10 15 22 12 47 3.3 -9 678.80 -60.4 -56.9 -58.7 68 -99 SPO 1997 10 15 22 13 46 3.3 -9 678.80 -60.4 -57.0 -58.7 68 -99 SPO 1997 10 15 22 14 46 3.4 -9 678.80 -60.4 -57.0 -58.7 68 -99 SPO 1997 10 15 22 15 46 3.3 -9 678.80 -60.4 -57.0 -58.7 69 -99 SPO 1997 10 15 22 16 45 3.3 -9 678.80 -60.4 -56.9 -58.7 69 -99 SPO 1997 10 15 22 17 44 3.2 -9 678.80 -60.4 -57.0 -58.7 69 -99 SPO 1997 10 15 22 18 42 3.4 -9 678.80 -60.5 -57.0 -58.6 69 -99 SPO 1997 10 15 22 19 43 3.5 -9 678.70 -60.4 -56.9 -58.6 69 -99 SPO 1997 10 15 22 20 44 3.5 -9 678.70 -60.4 -56.9 -58.6 68 -99 SPO 1997 10 15 22 21 44 3.5 -9 678.70 -60.5 -56.8 -58.6 68 -99 SPO 1997 10 15 22 22 44 3.5 -9 678.70 -60.6 -56.8 -58.6 68 -99 SPO 1997 10 15 22 23 42 3.5 -9 678.70 -60.6 -56.7 -58.6 68 -99 SPO 1997 10 15 22 24 43 3.5 -9 678.70 -60.5 -56.7 -58.6 67 -99 SPO 1997 10 15 22 25 44 3.4 -9 678.70 -60.6 -56.8 -58.6 68 -99 SPO 1997 10 15 22 26 44 3.4 -9 678.60 -60.6 -56.7 -58.6 68 -99 SPO 1997 10 15 22 27 45 3.5 -9 678.60 -60.6 -56.7 -58.6 69 -99 SPO 1997 10 15 22 28 47 3.5 -9 678.60 -60.6 -56.7 -58.6 68 -99 SPO 1997 10 15 22 29 46 3.5 -9 678.60 -60.6 -56.6 -58.6 68 -99 SPO 1997 10 15 22 30 47 3.5 -9 678.60 -60.7 -56.7 -58.7 68 -99 SPO 1997 10 15 22 31 48 3.5 -9 678.60 -60.7 -56.7 -58.9 68 -99 SPO 1997 10 15 22 32 49 3.5 -9 678.70 -60.7 -56.8 -59.2 69 -99 SPO 1997 10 15 22 33 52 3.4 -9 678.70 -60.8 -56.9 -59.3 69 -99 SPO 1997 10 15 22 34 52 3.5 -9 678.60 -60.8 -56.9 -59.4 69 -99 SPO 1997 10 15 22 35 51 3.7 -9 678.60 -60.8 -56.9 -59.4 68 -99 SPO 1997 10 15 22 36 51 3.7 -9 678.60 -60.8 -56.9 -59.6 68 -99 SPO 1997 10 15 22 37 50 3.8 -9 678.60 -60.8 -56.9 -59.6 68 -99 SPO 1997 10 15 22 38 51 3.9 -9 678.60 -60.8 -56.9 -59.6 68 -99 SPO 1997 10 15 22 39 50 4.0 -9 678.60 -60.9 -56.8 -59.4 69 -99 SPO 1997 10 15 22 40 51 4.0 -9 678.60 -60.8 -56.8 -59.2 68 -99 SPO 1997 10 15 22 41 52 4.0 -9 678.60 -60.8 -56.8 -59.2 68 -99 SPO 1997 10 15 22 42 51 4.1 -9 678.50 -60.8 -56.8 -59.2 68 -99 SPO 1997 10 15 22 43 51 4.0 -9 678.50 -60.8 -56.8 -59.1 68 -99 SPO 1997 10 15 22 44 51 4.0 -9 678.50 -60.8 -56.8 -59.2 68 -99 SPO 1997 10 15 22 45 50 3.9 -9 678.50 -60.8 -56.8 -59.1 68 -99 SPO 1997 10 15 22 46 49 3.9 -9 678.50 -60.8 -56.8 -59.1 67 -99 SPO 1997 10 15 22 47 49 3.9 -9 678.50 -60.8 -56.8 -59.1 66 -99 SPO 1997 10 15 22 48 49 3.8 -9 678.50 -60.8 -56.9 -59.1 66 -99 SPO 1997 10 15 22 49 49 3.8 -9 678.50 -60.8 -56.9 -59.1 66 -99 SPO 1997 10 15 22 50 50 3.7 -9 678.50 -60.8 -57.0 -59.2 66 -99 SPO 1997 10 15 22 51 49 3.6 -9 678.50 -60.8 -57.1 -59.1 67 -99 SPO 1997 10 15 22 52 46 3.6 -9 678.50 -60.8 -57.1 -59.2 68 -99 SPO 1997 10 15 22 53 44 3.6 -9 678.50 -60.8 -57.1 -59.3 68 -99 SPO 1997 10 15 22 54 43 3.6 -9 678.50 -60.8 -57.1 -59.6 68 -99 SPO 1997 10 15 22 55 43 3.6 -9 678.50 -60.7 -57.1 -59.7 68 -99 SPO 1997 10 15 22 56 43 3.6 -9 678.50 -60.7 -57.0 -59.8 68 -99 SPO 1997 10 15 22 57 42 3.6 -9 678.50 -60.7 -57.0 -59.8 68 -99 SPO 1997 10 15 22 58 43 3.6 -9 678.50 -60.7 -57.0 -59.8 68 -99 SPO 1997 10 15 22 59 43 3.8 -9 678.50 -60.7 -57.0 -59.8 67 -99 SPO 1997 10 15 23 00 44 4.0 -9 678.50 -60.7 -57.0 -59.8 66 0 SPO 1997 10 15 23 01 42 4.0 -9 678.50 -60.7 -57.0 -59.7 66 -99 SPO 1997 10 15 23 02 41 4.0 -9 678.50 -60.6 -57.0 -59.5 65 -99 SPO 1997 10 15 23 03 41 4.0 -9 678.50 -60.6 -57.0 -59.3 64 -99 SPO 1997 10 15 23 04 42 4.0 -9 678.50 -60.6 -57.0 -59.2 65 -99 SPO 1997 10 15 23 05 42 4.0 -9 678.50 -60.7 -57.0 -59.2 66 -99 SPO 1997 10 15 23 06 43 4.0 -9 678.50 -60.6 -57.0 -59.1 66 -99 SPO 1997 10 15 23 07 44 4.1 -9 678.50 -60.6 -57.0 -59.2 67 -99 SPO 1997 10 15 23 08 45 4.0 -9 678.50 -60.6 -57.0 -59.2 67 -99 SPO 1997 10 15 23 09 46 4.1 -9 678.50 -60.6 -56.9 -59.4 67 -99 SPO 1997 10 15 23 10 44 4.2 -9 678.60 -60.7 -56.8 -59.7 68 -99 SPO 1997 10 15 23 11 43 4.1 -9 678.60 -60.7 -56.8 -59.9 68 -99 SPO 1997 10 15 23 12 43 4.1 -9 678.60 -60.7 -56.9 -60.0 67 -99 SPO 1997 10 15 23 13 44 4.2 -9 678.60 -60.7 -56.9 -60.0 66 -99 SPO 1997 10 15 23 14 43 4.3 -9 678.60 -60.7 -56.8 -59.9 66 -99 SPO 1997 10 15 23 15 42 4.3 -9 678.60 -60.7 -56.8 -59.7 65 -99 SPO 1997 10 15 23 16 42 4.4 -9 678.50 -60.7 -56.8 -59.5 66 -99 SPO 1997 10 15 23 17 42 4.5 -9 678.50 -60.7 -56.8 -59.5 66 -99 SPO 1997 10 15 23 18 41 4.6 -9 678.50 -60.6 -56.8 -59.4 65 -99 SPO 1997 10 15 23 19 41 4.5 -9 678.50 -60.6 -56.8 -59.4 66 -99 SPO 1997 10 15 23 20 41 4.6 -9 678.50 -60.6 -56.9 -59.4 66 -99 SPO 1997 10 15 23 21 42 4.6 -9 678.50 -60.5 -56.9 -59.4 65 -99 SPO 1997 10 15 23 22 41 4.6 -9 678.40 -60.5 -56.9 -59.3 65 -99 SPO 1997 10 15 23 23 39 4.5 -9 678.40 -60.4 -57.0 -59.2 64 -99 SPO 1997 10 15 23 24 39 4.5 -9 678.50 -60.2 -57.0 -59.1 63 -99 SPO 1997 10 15 23 25 39 4.5 -9 678.50 -60.0 -57.1 -58.9 62 -99 SPO 1997 10 15 23 26 39 4.5 -9 678.50 -59.8 -57.1 -58.8 61 -99 SPO 1997 10 15 23 27 39 4.5 -9 678.50 -59.6 -57.2 -58.6 61 -99 SPO 1997 10 15 23 28 39 4.5 -9 678.50 -59.5 -57.3 -58.6 62 -99 SPO 1997 10 15 23 29 40 4.5 -9 678.40 -59.4 -57.2 -58.7 63 -99 SPO 1997 10 15 23 30 39 4.4 -9 678.40 -59.4 -57.2 -58.8 64 -99 SPO 1997 10 15 23 31 39 4.4 -9 678.40 -59.4 -57.2 -58.9 65 -99 SPO 1997 10 15 23 32 39 4.4 -9 678.40 -59.4 -57.2 -58.8 65 -99 SPO 1997 10 15 23 33 41 4.4 -9 678.40 -59.3 -57.2 -58.6 65 -99 SPO 1997 10 15 23 34 42 4.4 -9 678.40 -59.4 -57.1 -58.4 65 -99 SPO 1997 10 15 23 35 43 4.3 -9 678.40 -59.4 -57.1 -58.3 65 -99 SPO 1997 10 15 23 36 42 4.5 -9 678.40 -59.4 -57.1 -58.3 65 -99 SPO 1997 10 15 23 37 43 4.5 -9 678.40 -59.5 -57.1 -58.4 65 -99 SPO 1997 10 15 23 38 45 4.5 -9 678.40 -59.5 -57.2 -58.4 66 -99 SPO 1997 10 15 23 39 45 4.4 -9 678.40 -59.6 -57.2 -58.4 67 -99 SPO 1997 10 15 23 40 44 4.2 -9 678.40 -59.7 -57.2 -58.4 68 -99 SPO 1997 10 15 23 41 43 4.1 -9 678.40 -59.8 -57.2 -58.4 69 -99 SPO 1997 10 15 23 42 44 4.0 -9 678.40 -59.9 -57.3 -58.6 69 -99 SPO 1997 10 15 23 43 44 3.8 -9 678.40 -60.0 -57.2 -58.8 69 -99 SPO 1997 10 15 23 44 42 3.7 -9 678.50 -60.1 -57.3 -58.7 69 -99 SPO 1997 10 15 23 45 43 3.8 -9 678.50 -60.1 -57.3 -58.6 69 -99 SPO 1997 10 15 23 46 42 3.8 -9 678.50 -60.2 -57.3 -58.5 69 -99 SPO 1997 10 15 23 47 41 3.7 -9 678.50 -60.3 -57.3 -58.5 69 -99 SPO 1997 10 15 23 48 42 3.7 -9 678.40 -60.3 -57.3 -58.5 68 -99 SPO 1997 10 15 23 49 42 3.7 -9 678.50 -60.4 -57.3 -58.5 68 -99 SPO 1997 10 15 23 50 42 3.6 -9 678.50 -60.4 -57.3 -58.6 67 -99 SPO 1997 10 15 23 51 43 3.6 -9 678.40 -60.4 -57.3 -58.6 68 -99 SPO 1997 10 15 23 52 44 3.8 -9 678.50 -60.4 -57.3 -58.7 67 -99 SPO 1997 10 15 23 53 45 3.7 -9 678.50 -60.6 -57.3 -58.8 68 -99 SPO 1997 10 15 23 54 45 3.7 -9 678.50 -60.7 -57.4 -59.0 69 -99 SPO 1997 10 15 23 55 45 3.5 -9 678.50 -60.8 -57.4 -59.1 69 -99 SPO 1997 10 15 23 56 45 3.4 -9 678.50 -60.8 -57.4 -59.0 68 -99 SPO 1997 10 15 23 57 46 3.2 -9 678.50 -60.9 -57.4 -58.9 68 -99 SPO 1997 10 15 23 58 47 3.3 -9 678.50 -61.0 -57.4 -58.8 -99 -99 SPO 1997 10 15 23 59 47 3.1 -9 678.50 -61.0 -57.4 -58.8 -99 -99 SPO 1997 10 16 00 00 48 3.0 -9 678.50 -61.1 -57.5 -58.8 -99 0 SPO 1997 10 16 00 01 48 2.9 -9 678.50 -61.1 -57.5 -58.8 -99 -99 SPO 1997 10 16 00 02 47 2.7 -9 678.50 -61.1 -57.6 -58.7 -99 -99 SPO 1997 10 16 00 03 48 2.6 -9 678.50 -61.1 -57.6 -58.6 66 -99 SPO 1997 10 16 00 04 53 2.4 -9 678.50 -61.1 -57.7 -58.4 66 -99 SPO 1997 10 16 00 05 58 2.3 -9 678.50 -61.0 -57.8 -58.3 65 -99 SPO 1997 10 16 00 06 61 2.3 -9 678.50 -61.0 -57.8 -58.2 65 -99 SPO 1997 10 16 00 07 63 2.5 -9 678.50 -61.0 -57.8 -58.1 65 -99 SPO 1997 10 16 00 08 61 2.6 -9 678.50 -61.1 -57.8 -58.2 66 -99 SPO 1997 10 16 00 09 60 2.7 -9 678.50 -61.1 -57.8 -58.4 66 -99 SPO 1997 10 16 00 10 58 2.9 -9 678.50 -61.2 -57.9 -58.6 67 -99 SPO 1997 10 16 00 11 56 2.9 -9 678.50 -61.2 -57.8 -58.7 67 -99 SPO 1997 10 16 00 12 58 2.8 -9 678.50 -61.3 -57.9 -58.9 67 -99 SPO 1997 10 16 00 13 59 3.0 -9 678.50 -61.2 -57.9 -59.0 67 -99 SPO 1997 10 16 00 14 57 3.1 -9 678.50 -61.3 -57.8 -59.3 67 -99 SPO 1997 10 16 00 15 55 3.0 -9 678.50 -61.2 -57.7 -59.4 67 -99 SPO 1997 10 16 00 16 51 3.2 -9 678.50 -61.3 -57.7 -59.6 67 -99 SPO 1997 10 16 00 17 52 3.0 -9 678.50 -61.2 -57.8 -59.7 67 -99 SPO 1997 10 16 00 18 51 3.1 -9 678.50 -61.2 -57.7 -59.7 67 -99 SPO 1997 10 16 00 19 49 3.1 -9 678.50 -61.2 -57.6 -59.6 67 -99 SPO 1997 10 16 00 20 48 3.1 -9 678.50 -61.1 -57.6 -59.4 66 -99 SPO 1997 10 16 00 21 48 3.2 -9 678.50 -61.1 -57.6 -59.4 66 -99 SPO 1997 10 16 00 22 47 3.3 -9 678.50 -61.0 -57.5 -59.3 66 -99 SPO 1997 10 16 00 23 45 3.2 -9 678.50 -61.0 -57.5 -59.2 67 -99 SPO 1997 10 16 00 24 44 3.2 -9 678.50 -60.8 -57.4 -59.0 65 -99 SPO 1997 10 16 00 25 44 3.3 -9 678.50 -60.8 -57.5 -59.0 65 -99 SPO 1997 10 16 00 26 44 3.2 -9 678.50 -60.8 -57.5 -59.0 65 -99 SPO 1997 10 16 00 27 44 3.2 -9 678.50 -60.8 -57.6 -59.0 65 -99 SPO 1997 10 16 00 28 46 3.1 -9 678.50 -60.7 -57.6 -59.0 65 -99 SPO 1997 10 16 00 29 48 3.0 -9 678.50 -60.7 -57.7 -59.0 66 -99 SPO 1997 10 16 00 30 46 2.9 -9 678.50 -60.7 -57.7 -58.9 67 -99 SPO 1997 10 16 00 31 44 3.0 -9 678.50 -60.7 -57.8 -58.9 68 -99 SPO 1997 10 16 00 32 45 3.0 -9 678.50 -60.7 -57.8 -59.0 68 -99 SPO 1997 10 16 00 33 45 2.9 -9 678.50 -60.7 -57.8 -59.2 68 -99 SPO 1997 10 16 00 34 45 2.9 -9 678.50 -60.7 -57.7 -59.4 68 -99 SPO 1997 10 16 00 35 43 3.0 -9 678.50 -60.7 -57.6 -59.6 68 -99 SPO 1997 10 16 00 36 42 3.1 -9 678.50 -60.7 -57.5 -59.6 68 -99 SPO 1997 10 16 00 37 41 3.1 -9 678.50 -60.7 -57.4 -59.6 67 -99 SPO 1997 10 16 00 38 41 3.1 -9 678.50 -60.7 -57.4 -59.6 66 -99 SPO 1997 10 16 00 39 40 3.1 -9 678.50 -60.7 -57.4 -59.7 65 -99 SPO 1997 10 16 00 40 39 3.2 -9 678.50 -60.7 -57.3 -59.7 65 -99 SPO 1997 10 16 00 41 38 3.2 -9 678.50 -60.6 -57.3 -59.8 64 -99 SPO 1997 10 16 00 42 39 3.3 -9 678.50 -60.5 -57.3 -59.8 63 -99 SPO 1997 10 16 00 43 40 3.3 -9 678.50 -60.6 -57.3 -59.7 64 -99 SPO 1997 10 16 00 44 40 3.2 -9 678.50 -60.6 -57.4 -59.7 64 -99 SPO 1997 10 16 00 45 40 3.3 -9 678.50 -60.6 -57.4 -59.7 65 -99 SPO 1997 10 16 00 46 42 3.4 -9 678.50 -60.6 -57.4 -59.7 65 -99 SPO 1997 10 16 00 47 43 3.4 -9 678.50 -60.6 -57.4 -59.7 66 -99 SPO 1997 10 16 00 48 44 3.6 -9 678.50 -60.6 -57.4 -59.8 66 -99 SPO 1997 10 16 00 49 45 3.7 -9 678.50 -60.6 -57.4 -59.8 65 -99 SPO 1997 10 16 00 50 46 3.7 -9 678.50 -60.6 -57.3 -59.8 64 -99 SPO 1997 10 16 00 51 48 3.7 -9 678.50 -60.6 -57.3 -59.8 63 -99 SPO 1997 10 16 00 52 48 3.8 -9 678.50 -60.6 -57.3 -59.8 63 -99 SPO 1997 10 16 00 53 49 3.9 -9 678.50 -60.6 -57.2 -59.8 62 -99 SPO 1997 10 16 00 54 51 3.7 -9 678.50 -60.6 -57.2 -59.8 63 -99 SPO 1997 10 16 00 55 51 3.7 -9 678.60 -60.6 -57.2 -59.7 63 -99 SPO 1997 10 16 00 56 50 3.6 -9 678.60 -60.6 -57.2 -59.6 63 -99 SPO 1997 10 16 00 57 51 3.9 -9 678.50 -60.6 -57.1 -59.5 63 -99 SPO 1997 10 16 00 58 52 4.0 -9 678.50 -60.6 -57.0 -59.6 63 -99 SPO 1997 10 16 00 59 51 4.0 -9 678.50 -60.6 -57.0 -59.6 63 -99 SPO 1997 10 16 01 00 50 4.0 -9 678.50 -60.6 -57.0 -59.6 63 0 SPO 1997 10 16 01 01 51 4.0 -9 678.50 -60.6 -57.1 -59.5 63 -99 SPO 1997 10 16 01 02 51 4.1 -9 678.50 -60.6 -57.0 -59.5 63 -99 SPO 1997 10 16 01 03 52 4.1 -9 678.50 -60.6 -57.0 -59.4 63 -99 SPO 1997 10 16 01 04 52 4.2 -9 678.50 -60.6 -57.0 -59.4 63 -99 SPO 1997 10 16 01 05 53 4.2 -9 678.50 -60.6 -57.1 -59.3 63 -99 SPO 1997 10 16 01 06 55 4.2 -9 678.50 -60.6 -57.1 -59.3 64 -99 SPO 1997 10 16 01 07 58 4.2 -9 678.50 -60.6 -57.0 -59.4 65 -99 SPO 1997 10 16 01 08 58 4.1 -9 678.50 -60.6 -57.2 -59.4 65 -99 SPO 1997 10 16 01 09 60 4.1 -9 678.50 -60.6 -57.2 -59.4 65 -99 SPO 1997 10 16 01 10 60 4.3 -9 678.50 -60.6 -57.2 -59.4 65 -99 SPO 1997 10 16 01 11 62 4.3 -9 678.40 -60.6 -57.1 -59.4 65 -99 SPO 1997 10 16 01 12 62 4.4 -9 678.40 -60.6 -57.1 -59.4 65 -99 SPO 1997 10 16 01 13 63 4.5 -9 678.40 -60.6 -57.1 -59.3 65 -99 SPO 1997 10 16 01 14 65 4.1 -9 678.50 -60.5 -57.2 -59.3 63 -99 SPO 1997 10 16 01 15 64 4.2 -9 678.50 -60.6 -57.5 -59.3 63 -99 SPO 1997 10 16 01 16 64 4.0 -9 678.50 -60.6 -57.6 -59.2 64 -99 SPO 1997 10 16 01 17 65 4.0 -9 678.50 -60.6 -57.7 -59.2 64 -99 SPO 1997 10 16 01 18 65 3.9 -9 678.50 -60.6 -57.7 -59.2 65 -99 SPO 1997 10 16 01 19 66 4.1 -9 678.50 -60.6 -57.7 -59.2 65 -99 SPO 1997 10 16 01 20 66 4.0 -9 678.50 -60.7 -57.8 -59.3 66 -99 SPO 1997 10 16 01 21 66 4.1 -9 678.50 -60.7 -57.8 -59.2 66 -99 SPO 1997 10 16 01 22 65 4.0 -9 678.40 -60.7 -58.0 -59.2 66 -99 SPO 1997 10 16 01 23 64 4.2 -9 678.40 -60.7 -58.0 -59.2 66 -99 SPO 1997 10 16 01 24 62 4.2 -9 678.40 -60.7 -58.0 -59.2 66 -99 SPO 1997 10 16 01 25 61 4.2 -9 678.40 -60.7 -57.9 -59.3 66 -99 SPO 1997 10 16 01 26 60 4.3 -9 678.40 -60.8 -58.0 -59.2 65 -99 SPO 1997 10 16 01 27 59 4.3 -9 678.40 -60.8 -57.9 -59.3 65 -99 SPO 1997 10 16 01 28 57 4.1 -9 678.40 -60.8 -57.9 -59.2 64 -99 SPO 1997 10 16 01 29 58 4.0 -9 678.40 -60.7 -58.0 -59.2 63 -99 SPO 1997 10 16 01 30 58 4.0 -9 678.40 -60.7 -58.1 -59.1 63 -99 SPO 1997 10 16 01 31 58 3.9 -9 678.40 -60.7 -58.1 -59.1 64 -99 SPO 1997 10 16 01 32 57 3.8 -9 678.40 -60.7 -58.1 -59.1 65 -99 SPO 1997 10 16 01 33 58 3.8 -9 678.40 -60.6 -58.2 -59.1 64 -99 SPO 1997 10 16 01 34 59 3.8 -9 678.40 -60.6 -58.2 -59.1 64 -99 SPO 1997 10 16 01 35 60 3.8 -9 678.40 -60.6 -58.0 -59.1 65 -99 SPO 1997 10 16 01 36 60 3.8 -9 678.40 -60.6 -58.0 -59.1 65 -99 SPO 1997 10 16 01 37 59 3.8 -9 678.40 -60.6 -57.9 -59.0 65 -99 SPO 1997 10 16 01 38 58 3.8 -9 678.40 -60.6 -57.9 -59.0 64 -99 SPO 1997 10 16 01 39 58 3.6 -9 678.40 -60.6 -57.9 -59.1 64 -99 SPO 1997 10 16 01 40 57 3.5 -9 678.40 -60.6 -57.8 -59.0 64 -99 SPO 1997 10 16 01 41 58 3.4 -9 678.40 -60.6 -57.8 -58.9 64 -99 SPO 1997 10 16 01 42 59 3.3 -9 678.40 -60.5 -57.9 -58.9 63 -99 SPO 1997 10 16 01 43 59 3.2 -9 678.40 -60.6 -58.0 -58.8 65 -99 SPO 1997 10 16 01 44 61 3.3 -9 678.40 -60.6 -57.9 -58.9 66 -99 SPO 1997 10 16 01 45 62 3.4 -9 678.40 -60.5 -57.8 -59.0 65 -99 SPO 1997 10 16 01 46 62 3.5 -9 678.40 -60.6 -58.0 -59.0 66 -99 SPO 1997 10 16 01 47 62 3.3 -9 678.40 -60.6 -57.9 -59.0 65 -99 SPO 1997 10 16 01 48 62 3.3 -9 678.40 -60.6 -57.9 -59.0 66 -99 SPO 1997 10 16 01 49 63 3.3 -9 678.40 -60.6 -57.9 -59.1 65 -99 SPO 1997 10 16 01 50 63 3.4 -9 678.40 -60.7 -57.8 -59.2 66 -99 SPO 1997 10 16 01 51 64 3.4 -9 678.40 -60.7 -58.0 -59.2 66 -99 SPO 1997 10 16 01 52 65 3.5 -9 678.40 -60.7 -58.0 -59.2 65 -99 SPO 1997 10 16 01 53 63 3.6 -9 678.40 -60.7 -58.0 -59.2 64 -99 SPO 1997 10 16 01 54 63 3.6 -9 678.40 -60.7 -57.9 -59.1 64 -99 SPO 1997 10 16 01 55 62 3.7 -9 678.40 -60.7 -58.0 -59.1 64 -99 SPO 1997 10 16 01 56 61 3.6 -9 678.40 -60.8 -57.8 -59.2 66 -99 SPO 1997 10 16 01 57 60 3.7 -9 678.40 -60.8 -57.8 -59.2 67 -99 SPO 1997 10 16 01 58 58 3.6 -9 678.40 -60.7 -57.8 -59.1 66 -99 SPO 1997 10 16 01 59 57 3.6 -9 678.40 -60.7 -57.8 -59.0 66 -99 SPO 1997 10 16 02 00 57 3.7 -9 678.30 -60.7 -57.8 -59.0 67 0 SPO 1997 10 16 02 01 56 3.7 -9 678.30 -60.7 -57.7 -59.0 66 -99 SPO 1997 10 16 02 02 54 3.7 -9 678.30 -60.7 -57.7 -59.0 66 -99 SPO 1997 10 16 02 03 52 3.8 -9 678.30 -60.7 -57.6 -59.1 66 -99 SPO 1997 10 16 02 04 51 3.7 -9 678.30 -60.7 -57.5 -59.0 66 -99 SPO 1997 10 16 02 05 52 3.7 -9 678.30 -60.6 -57.4 -59.0 65 -99 SPO 1997 10 16 02 06 52 3.8 -9 678.30 -60.6 -57.4 -59.0 64 -99 SPO 1997 10 16 02 07 52 3.8 -9 678.30 -60.6 -57.5 -59.0 65 -99 SPO 1997 10 16 02 08 52 3.7 -9 678.30 -60.6 -57.5 -59.0 66 -99 SPO 1997 10 16 02 09 55 3.7 -9 678.30 -60.6 -57.6 -59.0 66 -99 SPO 1997 10 16 02 10 57 3.7 -9 678.30 -60.6 -57.6 -59.0 66 -99 SPO 1997 10 16 02 11 59 3.8 -9 678.30 -60.6 -57.6 -59.1 67 -99 SPO 1997 10 16 02 12 59 4.0 -9 678.30 -60.6 -57.6 -59.1 67 -99 SPO 1997 10 16 02 13 59 4.0 -9 678.30 -60.6 -57.6 -59.1 67 -99 SPO 1997 10 16 02 14 60 4.0 -9 678.30 -60.6 -57.7 -59.1 68 -99 SPO 1997 10 16 02 15 62 4.0 -9 678.20 -60.5 -57.8 -59.1 66 -99 SPO 1997 10 16 02 16 65 4.0 -9 678.30 -60.5 -57.8 -59.1 64 -99 SPO 1997 10 16 02 17 65 4.0 -9 678.30 -60.5 -57.8 -59.0 64 -99 SPO 1997 10 16 02 18 65 4.0 -9 678.30 -60.5 -57.8 -59.0 65 -99 SPO 1997 10 16 02 19 66 4.0 -9 678.30 -60.5 -57.8 -59.0 66 -99 SPO 1997 10 16 02 20 65 4.0 -9 678.20 -60.5 -57.8 -59.0 66 -99 SPO 1997 10 16 02 21 64 4.0 -9 678.30 -60.5 -57.6 -58.9 67 -99 SPO 1997 10 16 02 22 65 4.0 -9 678.20 -60.5 -57.7 -58.9 67 -99 SPO 1997 10 16 02 23 64 4.1 -9 678.20 -60.4 -57.7 -58.9 66 -99 SPO 1997 10 16 02 24 63 4.0 -9 678.20 -60.4 -57.8 -58.9 66 -99 SPO 1997 10 16 02 25 63 4.0 -9 678.20 -60.4 -57.7 -58.9 67 -99 SPO 1997 10 16 02 26 63 3.9 -9 678.20 -60.4 -57.7 -58.8 67 -99 SPO 1997 10 16 02 27 63 4.1 -9 678.20 -60.4 -57.7 -58.9 67 -99 SPO 1997 10 16 02 28 62 4.2 -9 678.20 -60.4 -57.7 -59.0 66 -99 SPO 1997 10 16 02 29 62 4.3 -9 678.10 -60.3 -57.6 -59.1 64 -99 SPO 1997 10 16 02 30 61 4.4 -9 678.10 -60.3 -57.6 -59.1 64 -99 SPO 1997 10 16 02 31 61 4.3 -9 678.10 -60.4 -57.6 -59.1 65 -99 SPO 1997 10 16 02 32 62 4.4 -9 678.10 -60.3 -57.8 -59.1 64 -99 SPO 1997 10 16 02 33 61 4.3 -9 678.10 -60.2 -57.8 -59.0 64 -99 SPO 1997 10 16 02 34 60 4.4 -9 678.20 -60.1 -57.9 -58.9 64 -99 SPO 1997 10 16 02 35 60 4.7 -9 678.00 -60.1 -57.8 -59.0 64 -99 SPO 1997 10 16 02 36 61 4.5 -9 678.00 -60.2 -57.9 -59.0 67 -99 SPO 1997 10 16 02 37 61 4.8 -9 678.00 -60.2 -57.8 -59.0 67 -99 SPO 1997 10 16 02 38 62 4.3 -9 678.00 -60.2 -57.9 -59.0 67 -99 SPO 1997 10 16 02 39 61 4.4 -9 678.00 -60.2 -57.9 -59.0 66 -99 SPO 1997 10 16 02 40 60 4.1 -9 678.00 -60.1 -58.1 -59.0 64 -99 SPO 1997 10 16 02 41 61 4.2 -9 678.00 -60.1 -58.1 -59.0 64 -99 SPO 1997 10 16 02 42 60 4.2 -9 678.00 -60.1 -58.0 -59.1 64 -99 SPO 1997 10 16 02 43 59 4.4 -9 678.00 -60.1 -57.8 -59.2 64 -99 SPO 1997 10 16 02 44 59 4.5 -9 678.00 -60.1 -57.7 -59.2 64 -99 SPO 1997 10 16 02 45 59 4.5 -9 678.00 -60.0 -57.6 -59.2 64 -99 SPO 1997 10 16 02 46 59 4.6 -9 678.10 -60.0 -57.5 -59.1 64 -99 SPO 1997 10 16 02 47 59 4.5 -9 678.10 -59.9 -57.4 -59.1 64 -99 SPO 1997 10 16 02 48 58 4.4 -9 678.10 -59.9 -57.4 -59.0 64 -99 SPO 1997 10 16 02 49 57 4.2 -9 678.10 -59.9 -57.6 -59.0 64 -99 SPO 1997 10 16 02 50 57 4.2 -9 678.10 -59.9 -57.5 -59.0 64 -99 SPO 1997 10 16 02 51 59 4.3 -9 678.10 -59.9 -57.4 -58.9 64 -99 SPO 1997 10 16 02 52 59 4.3 -9 678.10 -59.9 -57.4 -59.0 64 -99 SPO 1997 10 16 02 53 57 4.3 -9 678.20 -59.9 -57.5 -59.1 64 -99 SPO 1997 10 16 02 54 57 4.3 -9 678.20 -60.0 -57.5 -59.2 64 -99 SPO 1997 10 16 02 55 56 4.3 -9 678.20 -60.0 -57.5 -59.3 64 -99 SPO 1997 10 16 02 56 54 4.0 -9 678.20 -60.0 -57.6 -59.3 64 -99 SPO 1997 10 16 02 57 51 4.0 -9 678.20 -60.0 -57.7 -59.3 64 -99 SPO 1997 10 16 02 58 50 4.0 -9 678.20 -60.0 -57.8 -59.2 64 -99 SPO 1997 10 16 02 59 51 4.0 -9 678.20 -60.0 -57.8 -59.2 64 -99 SPO 1997 10 16 03 00 51 4.0 -9 678.20 -60.0 -57.6 -59.0 64 0 SPO 1997 10 16 03 01 52 4.2 -9 678.10 -60.0 -57.6 -59.0 63 -99 SPO 1997 10 16 03 02 51 4.2 -9 678.10 -59.9 -57.5 -59.0 61 -99 SPO 1997 10 16 03 03 49 4.3 -9 678.10 -60.0 -57.6 -59.0 63 -99 SPO 1997 10 16 03 04 47 4.2 -9 678.20 -59.9 -57.6 -59.0 61 -99 SPO 1997 10 16 03 05 46 4.2 -9 678.20 -59.9 -57.6 -59.0 61 -99 SPO 1997 10 16 03 06 44 4.3 -9 678.20 -60.0 -57.7 -59.1 62 -99 SPO 1997 10 16 03 07 43 4.2 -9 678.20 -59.9 -57.8 -59.1 62 -99 SPO 1997 10 16 03 08 44 4.1 -9 678.20 -59.9 -57.8 -59.1 62 -99 SPO 1997 10 16 03 09 45 4.2 -9 678.20 -59.9 -57.7 -59.1 63 -99 SPO 1997 10 16 03 10 46 4.2 -9 678.10 -59.9 -57.7 -59.1 63 -99 SPO 1997 10 16 03 11 46 4.2 -9 678.10 -59.9 -57.6 -59.0 64 -99 SPO 1997 10 16 03 12 45 4.2 -9 678.10 -59.8 -57.5 -58.8 64 -99 SPO 1997 10 16 03 13 45 4.3 -9 678.20 -59.7 -57.5 -58.6 63 -99 SPO 1997 10 16 03 14 45 4.3 -9 678.10 -59.6 -57.4 -58.4 63 -99 SPO 1997 10 16 03 15 45 4.3 -9 678.10 -59.6 -57.3 -58.4 63 -99 SPO 1997 10 16 03 16 46 4.3 -9 678.10 -59.5 -57.2 -58.3 62 -99 SPO 1997 10 16 03 17 46 4.3 -9 678.10 -59.5 -57.2 -58.3 63 -99 SPO 1997 10 16 03 18 45 4.3 -9 678.10 -59.5 -57.2 -58.2 64 -99 SPO 1997 10 16 03 19 44 4.4 -9 678.10 -59.4 -57.2 -58.1 64 -99 SPO 1997 10 16 03 20 44 4.4 -9 678.10 -59.4 -57.1 -58.1 65 -99 SPO 1997 10 16 03 21 43 4.4 -9 678.10 -59.3 -57.0 -58.0 65 -99 SPO 1997 10 16 03 22 42 4.5 -9 678.10 -59.3 -57.0 -58.0 66 -99 SPO 1997 10 16 03 23 42 4.5 -9 678.00 -59.2 -56.9 -58.0 66 -99 SPO 1997 10 16 03 24 41 4.5 -9 678.00 -59.2 -56.8 -58.0 67 -99 SPO 1997 10 16 03 25 41 4.4 -9 678.00 -59.2 -56.8 -57.9 67 -99 SPO 1997 10 16 03 26 41 4.3 -9 678.00 -59.1 -57.0 -57.9 66 -99 SPO 1997 10 16 03 27 42 4.3 -9 678.10 -59.1 -57.1 -57.8 66 -99 SPO 1997 10 16 03 28 42 4.2 -9 678.00 -59.1 -57.2 -57.8 66 -99 SPO 1997 10 16 03 29 41 4.3 -9 678.00 -59.1 -57.4 -57.8 65 -99 SPO 1997 10 16 03 30 42 4.2 -9 678.00 -59.1 -57.4 -57.8 66 -99 SPO 1997 10 16 03 31 43 4.4 -9 678.00 -59.1 -57.4 -57.7 67 -99 SPO 1997 10 16 03 32 44 4.3 -9 678.00 -59.0 -57.4 -57.7 67 -99 SPO 1997 10 16 03 33 44 4.2 -9 678.00 -59.0 -57.5 -57.7 67 -99 SPO 1997 10 16 03 34 44 4.3 -9 678.00 -59.0 -57.5 -57.8 67 -99 SPO 1997 10 16 03 35 44 4.3 -9 678.00 -59.1 -57.6 -57.9 69 -99 SPO 1997 10 16 03 36 45 4.2 -9 678.00 -59.1 -57.6 -57.9 69 -99 SPO 1997 10 16 03 37 47 4.2 -9 678.00 -59.2 -57.7 -58.0 69 -99 SPO 1997 10 16 03 38 48 4.1 -9 678.00 -59.2 -57.8 -58.1 68 -99 SPO 1997 10 16 03 39 49 4.2 -9 677.90 -59.2 -57.8 -58.2 67 -99 SPO 1997 10 16 03 40 51 4.2 -9 677.90 -59.3 -57.8 -58.2 66 -99 SPO 1997 10 16 03 41 51 4.2 -9 677.90 -59.3 -57.8 -58.2 65 -99 SPO 1997 10 16 03 42 51 4.2 -9 677.80 -59.4 -57.8 -58.3 66 -99 SPO 1997 10 16 03 43 50 4.2 -9 677.90 -59.5 -57.8 -58.3 67 -99 SPO 1997 10 16 03 44 50 4.1 -9 677.90 -59.5 -57.9 -58.4 66 -99 SPO 1997 10 16 03 45 51 4.0 -9 677.90 -59.6 -57.9 -58.4 65 -99 SPO 1997 10 16 03 46 52 4.0 -9 677.90 -59.6 -57.9 -58.4 65 -99 SPO 1997 10 16 03 47 53 4.0 -9 677.90 -59.6 -57.9 -58.4 64 -99 SPO 1997 10 16 03 48 53 3.9 -9 677.90 -59.7 -58.0 -58.4 65 -99 SPO 1997 10 16 03 49 54 3.8 -9 677.90 -59.7 -57.9 -58.3 65 -99 SPO 1997 10 16 03 50 53 3.9 -9 677.90 -59.7 -57.9 -58.2 64 -99 SPO 1997 10 16 03 51 53 3.8 -9 677.90 -59.7 -57.9 -58.2 64 -99 SPO 1997 10 16 03 52 51 3.7 -9 678.00 -59.8 -57.9 -58.1 64 -99 SPO 1997 10 16 03 53 51 3.6 -9 678.00 -59.8 -57.9 -58.1 65 -99 SPO 1997 10 16 03 54 52 3.6 -9 678.00 -59.7 -58.0 -58.2 64 -99 SPO 1997 10 16 03 55 53 3.6 -9 678.00 -59.7 -57.9 -58.2 64 -99 SPO 1997 10 16 03 56 52 3.6 -9 678.00 -59.8 -57.8 -58.1 66 -99 SPO 1997 10 16 03 57 53 3.5 -9 678.00 -59.8 -57.8 -58.1 67 -99 SPO 1997 10 16 03 58 52 3.6 -9 678.00 -59.8 -57.8 -58.1 67 -99 SPO 1997 10 16 03 59 51 3.7 -9 678.00 -59.8 -57.7 -58.2 66 -99 SPO 1997 10 16 04 00 51 3.7 -9 678.00 -59.8 -57.7 -58.2 66 0 SPO 1997 10 16 04 01 50 3.7 -9 678.00 -59.8 -57.6 -58.3 65 -99 SPO 1997 10 16 04 02 50 3.7 -9 678.00 -59.8 -57.6 -58.3 65 -99 SPO 1997 10 16 04 03 48 3.7 -9 678.00 -59.8 -57.6 -58.3 65 -99 SPO 1997 10 16 04 04 47 3.7 -9 678.00 -59.8 -57.6 -58.3 65 -99 SPO 1997 10 16 04 05 47 3.6 -9 678.00 -59.8 -57.6 -58.3 65 -99 SPO 1997 10 16 04 06 47 3.6 -9 678.00 -59.8 -57.6 -58.2 65 -99 SPO 1997 10 16 04 07 47 3.7 -9 678.00 -59.8 -57.6 -58.2 65 -99 SPO 1997 10 16 04 08 48 3.6 -9 678.00 -59.8 -57.6 -58.2 65 -99 SPO 1997 10 16 04 09 49 3.6 -9 678.00 -59.8 -57.6 -58.2 66 -99 SPO 1997 10 16 04 10 48 3.5 -9 678.00 -59.7 -57.4 -58.1 66 -99 SPO 1997 10 16 04 11 47 3.5 -9 678.00 -59.7 -57.4 -58.0 66 -99 SPO 1997 10 16 04 12 46 3.6 -9 678.00 -59.7 -57.4 -58.0 66 -99 SPO 1997 10 16 04 13 44 3.5 -9 678.00 -59.6 -57.4 -57.9 65 -99 SPO 1997 10 16 04 14 43 3.5 -9 678.00 -59.6 -57.4 -57.8 65 -99 SPO 1997 10 16 04 15 43 3.5 -9 678.00 -59.6 -57.4 -57.8 66 -99 SPO 1997 10 16 04 16 43 3.5 -9 678.00 -59.6 -57.4 -57.8 66 -99 SPO 1997 10 16 04 17 42 3.5 -9 678.00 -59.5 -57.5 -57.8 66 -99 SPO 1997 10 16 04 18 41 3.6 -9 678.00 -59.5 -57.4 -57.8 67 -99 SPO 1997 10 16 04 19 39 3.7 -9 678.00 -59.4 -57.3 -57.8 67 -99 SPO 1997 10 16 04 20 38 3.6 -9 678.00 -59.3 -57.3 -57.8 66 -99 SPO 1997 10 16 04 21 40 3.7 -9 678.00 -59.3 -57.3 -57.8 67 -99 SPO 1997 10 16 04 22 41 3.7 -9 678.00 -59.2 -57.3 -57.7 66 -99 SPO 1997 10 16 04 23 44 3.8 -9 677.90 -59.2 -57.2 -57.7 67 -99 SPO 1997 10 16 04 24 44 3.9 -9 677.90 -59.2 -57.2 -57.7 67 -99 SPO 1997 10 16 04 25 42 4.0 -9 677.80 -59.2 -57.2 -57.7 67 -99 SPO 1997 10 16 04 26 43 3.9 -9 677.80 -59.1 -57.2 -57.7 66 -99 SPO 1997 10 16 04 27 44 4.0 -9 677.80 -59.0 -57.2 -57.7 65 -99 SPO 1997 10 16 04 28 44 3.9 -9 677.80 -59.0 -57.2 -57.7 66 -99 SPO 1997 10 16 04 29 44 4.0 -9 677.80 -59.0 -57.2 -57.7 67 -99 SPO 1997 10 16 04 30 46 4.0 -9 677.80 -58.9 -57.2 -57.7 66 -99 SPO 1997 10 16 04 31 47 4.1 -9 677.80 -58.9 -57.1 -57.7 66 -99 SPO 1997 10 16 04 32 47 4.1 -9 677.80 -58.9 -57.1 -57.7 67 -99 SPO 1997 10 16 04 33 48 4.0 -9 677.80 -58.9 -57.1 -57.7 68 -99 SPO 1997 10 16 04 34 49 4.0 -9 677.80 -58.9 -57.2 -57.8 68 -99 SPO 1997 10 16 04 35 48 4.1 -9 677.80 -59.0 -57.2 -57.8 69 -99 SPO 1997 10 16 04 36 48 4.1 -9 677.80 -59.0 -57.2 -57.8 69 -99 SPO 1997 10 16 04 37 48 4.0 -9 677.80 -59.0 -57.2 -57.8 68 -99 SPO 1997 10 16 04 38 50 3.8 -9 677.80 -59.0 -57.2 -57.8 67 -99 SPO 1997 10 16 04 39 51 3.7 -9 677.70 -59.2 -57.3 -58.0 69 -99 SPO 1997 10 16 04 40 51 3.8 -9 677.80 -59.3 -57.3 -58.2 68 -99 SPO 1997 10 16 04 41 51 3.8 -9 677.70 -59.4 -57.3 -58.3 69 -99 SPO 1997 10 16 04 42 49 3.6 -9 677.70 -59.6 -57.4 -58.4 70 -99 SPO 1997 10 16 04 43 48 3.5 -9 677.80 -59.7 -57.5 -58.4 70 -99 SPO 1997 10 16 04 44 46 3.4 -9 677.80 -59.7 -57.5 -58.4 69 -99 SPO 1997 10 16 04 45 43 3.4 -9 677.80 -59.7 -57.6 -58.5 68 -99 SPO 1997 10 16 04 46 43 3.4 -9 677.80 -59.7 -57.7 -58.6 67 -99 SPO 1997 10 16 04 47 44 3.5 -9 677.80 -59.7 -57.7 -58.6 67 -99 SPO 1997 10 16 04 48 45 3.5 -9 677.80 -59.8 -57.8 -58.6 68 -99 SPO 1997 10 16 04 49 47 3.5 -9 677.80 -59.8 -57.8 -58.7 67 -99 SPO 1997 10 16 04 50 49 3.5 -9 677.80 -59.8 -57.8 -58.8 66 -99 SPO 1997 10 16 04 51 51 3.5 -9 677.80 -59.8 -57.8 -58.8 65 -99 SPO 1997 10 16 04 52 53 3.3 -9 677.80 -59.8 -57.8 -58.8 64 -99 SPO 1997 10 16 04 53 55 3.3 -9 677.80 -59.8 -57.8 -58.8 64 -99 SPO 1997 10 16 04 54 55 3.1 -9 677.80 -59.8 -57.9 -58.8 64 -99 SPO 1997 10 16 04 55 56 2.9 -9 677.80 -59.8 -58.0 -58.7 64 -99 SPO 1997 10 16 04 56 56 2.9 -9 677.80 -59.7 -58.0 -58.7 64 -99 SPO 1997 10 16 04 57 57 2.8 -9 677.80 -59.7 -58.1 -58.7 65 -99 SPO 1997 10 16 04 58 56 2.6 -9 677.80 -59.7 -58.2 -58.6 65 -99 SPO 1997 10 16 04 59 55 2.5 -9 677.90 -59.8 -58.2 -58.7 66 -99 SPO 1997 10 16 05 00 52 2.6 -9 677.90 -59.8 -58.2 -58.7 66 0 SPO 1997 10 16 05 01 50 2.5 -9 677.90 -59.8 -58.3 -58.6 66 -99 SPO 1997 10 16 05 02 48 2.6 -9 677.90 -59.8 -58.3 -58.7 65 -99 SPO 1997 10 16 05 03 44 2.5 -9 677.90 -59.8 -58.3 -58.7 64 -99 SPO 1997 10 16 05 04 40 2.5 -9 677.90 -59.9 -58.4 -58.7 64 -99 SPO 1997 10 16 05 05 38 2.6 -9 677.90 -59.8 -58.4 -58.7 64 -99 SPO 1997 10 16 05 06 39 2.6 -9 677.90 -59.8 -58.3 -58.7 64 -99 SPO 1997 10 16 05 07 39 2.5 -9 677.90 -59.8 -58.3 -58.6 64 -99 SPO 1997 10 16 05 08 40 2.6 -9 677.90 -59.8 -58.3 -58.6 64 -99 SPO 1997 10 16 05 09 45 2.8 -9 677.90 -59.8 -58.2 -58.7 64 -99 SPO 1997 10 16 05 10 47 2.8 -9 677.80 -59.7 -58.2 -58.7 64 -99 SPO 1997 10 16 05 11 48 2.9 -9 677.80 -59.7 -58.1 -58.7 64 -99 SPO 1997 10 16 05 12 48 2.9 -9 677.80 -59.7 -58.1 -58.7 64 -99 SPO 1997 10 16 05 13 48 2.8 -9 677.90 -59.7 -58.1 -58.8 64 -99 SPO 1997 10 16 05 14 49 2.8 -9 677.90 -59.7 -58.1 -58.7 64 -99 SPO 1997 10 16 05 15 52 2.8 -9 677.80 -59.7 -58.0 -58.7 64 -99 SPO 1997 10 16 05 16 56 2.7 -9 677.80 -59.7 -58.0 -58.6 63 -99 SPO 1997 10 16 05 17 58 2.5 -9 677.90 -59.7 -58.0 -58.6 63 -99 SPO 1997 10 16 05 18 58 2.5 -9 677.90 -59.8 -58.0 -58.6 63 -99 SPO 1997 10 16 05 19 59 2.4 -9 677.90 -59.8 -58.0 -58.5 63 -99 SPO 1997 10 16 05 20 60 2.5 -9 677.90 -59.8 -58.0 -58.5 63 -99 SPO 1997 10 16 05 21 59 2.5 -9 677.90 -59.8 -58.1 -58.5 63 -99 SPO 1997 10 16 05 22 60 2.6 -9 677.90 -59.9 -58.1 -58.6 64 -99 SPO 1997 10 16 05 23 59 2.6 -9 677.90 -59.9 -58.1 -58.6 64 -99 SPO 1997 10 16 05 24 57 2.7 -9 677.90 -59.9 -58.1 -58.5 64 -99 SPO 1997 10 16 05 25 57 2.8 -9 677.90 -60.0 -58.1 -58.5 64 -99 SPO 1997 10 16 05 26 57 2.7 -9 677.90 -60.0 -58.1 -58.5 64 -99 SPO 1997 10 16 05 27 56 2.6 -9 677.90 -60.0 -58.2 -58.5 64 -99 SPO 1997 10 16 05 28 53 2.6 -9 677.90 -60.0 -58.1 -58.6 64 -99 SPO 1997 10 16 05 29 50 2.6 -9 677.90 -60.0 -58.1 -58.6 64 -99 SPO 1997 10 16 05 30 49 2.6 -9 677.90 -60.0 -58.1 -58.6 64 -99 SPO 1997 10 16 05 31 48 2.6 -9 677.90 -60.0 -58.2 -58.6 64 -99 SPO 1997 10 16 05 32 50 2.5 -9 677.90 -60.0 -58.2 -58.6 65 -99 SPO 1997 10 16 05 33 50 2.6 -9 677.90 -59.9 -58.2 -58.5 64 -99 SPO 1997 10 16 05 34 49 2.7 -9 677.90 -59.9 -58.2 -58.6 65 -99 SPO 1997 10 16 05 35 49 2.8 -9 677.80 -59.9 -58.2 -58.6 65 -99 SPO 1997 10 16 05 36 47 2.8 -9 677.80 -59.9 -58.1 -58.5 66 -99 SPO 1997 10 16 05 37 45 2.8 -9 677.90 -59.9 -58.1 -58.4 66 -99 SPO 1997 10 16 05 38 45 2.8 -9 677.90 -59.8 -58.1 -58.4 66 -99 SPO 1997 10 16 05 39 46 2.8 -9 677.90 -59.8 -58.0 -58.4 67 -99 SPO 1997 10 16 05 40 47 3.0 -9 677.80 -59.8 -58.0 -58.3 67 -99 SPO 1997 10 16 05 41 47 3.0 -9 677.90 -59.8 -58.0 -58.4 68 -99 SPO 1997 10 16 05 42 46 3.0 -9 677.90 -59.8 -58.0 -58.3 67 -99 SPO 1997 10 16 05 43 47 3.1 -9 677.90 -59.7 -57.9 -58.3 66 -99 SPO 1997 10 16 05 44 48 3.1 -9 677.90 -59.6 -57.9 -58.2 64 -99 SPO 1997 10 16 05 45 51 3.2 -9 677.90 -59.6 -57.8 -58.2 64 -99 SPO 1997 10 16 05 46 51 3.3 -9 677.80 -59.5 -57.8 -58.2 64 -99 SPO 1997 10 16 05 47 52 3.3 -9 677.80 -59.5 -57.7 -58.2 65 -99 SPO 1997 10 16 05 48 53 3.4 -9 677.80 -59.5 -57.7 -58.2 65 -99 SPO 1997 10 16 05 49 54 3.4 -9 677.80 -59.5 -57.7 -58.2 66 -99 SPO 1997 10 16 05 50 54 3.5 -9 677.80 -59.5 -57.7 -58.2 66 -99 SPO 1997 10 16 05 51 54 3.6 -9 677.80 -59.5 -57.7 -58.2 66 -99 SPO 1997 10 16 05 52 54 3.6 -9 677.80 -59.5 -57.7 -58.3 66 -99 SPO 1997 10 16 05 53 54 3.7 -9 677.80 -59.6 -57.7 -58.3 67 -99 SPO 1997 10 16 05 54 56 3.8 -9 677.80 -59.6 -57.7 -58.4 68 -99 SPO 1997 10 16 05 55 58 3.9 -9 677.80 -59.7 -57.8 -58.4 69 -99 SPO 1997 10 16 05 56 58 3.9 -9 677.80 -59.8 -57.8 -58.5 69 -99 SPO 1997 10 16 05 57 60 3.9 -9 677.80 -59.8 -57.8 -58.5 67 -99 SPO 1997 10 16 05 58 60 4.0 -9 677.80 -59.8 -57.8 -58.6 66 -99 SPO 1997 10 16 05 59 59 4.1 -9 677.80 -59.8 -57.8 -58.6 66 -99 SPO 1997 10 16 06 00 60 4.1 -9 677.80 -59.8 -57.7 -58.6 66 0 SPO 1997 10 16 06 01 60 4.1 -9 677.80 -59.9 -57.7 -58.7 66 -99 SPO 1997 10 16 06 02 61 4.2 -9 677.80 -59.9 -57.8 -58.8 66 -99 SPO 1997 10 16 06 03 59 4.2 -9 677.80 -59.9 -57.7 -58.7 66 -99 SPO 1997 10 16 06 04 58 4.2 -9 677.80 -59.9 -57.7 -58.8 66 -99 SPO 1997 10 16 06 05 58 4.2 -9 677.80 -59.9 -57.8 -58.9 65 -99 SPO 1997 10 16 06 06 58 4.1 -9 677.80 -60.0 -57.8 -58.9 65 -99 SPO 1997 10 16 06 07 59 3.9 -9 677.80 -59.9 -57.8 -58.9 64 -99 SPO 1997 10 16 06 08 58 3.8 -9 677.80 -60.0 -58.0 -58.9 64 -99 SPO 1997 10 16 06 09 60 3.8 -9 677.80 -60.0 -58.0 -59.0 63 -99 SPO 1997 10 16 06 10 61 3.7 -9 677.80 -60.0 -58.0 -59.0 63 -99 SPO 1997 10 16 06 11 63 3.6 -9 677.80 -60.0 -58.1 -59.0 62 -99 SPO 1997 10 16 06 12 64 3.6 -9 677.80 -60.0 -58.2 -59.0 63 -99 SPO 1997 10 16 06 13 64 3.7 -9 677.80 -60.0 -58.1 -58.8 64 -99 SPO 1997 10 16 06 14 65 3.6 -9 677.80 -59.9 -58.0 -58.8 63 -99 SPO 1997 10 16 06 15 64 3.6 -9 677.80 -59.9 -58.1 -58.7 63 -99 SPO 1997 10 16 06 16 62 3.6 -9 677.90 -59.9 -58.1 -58.7 64 -99 SPO 1997 10 16 06 17 62 3.8 -9 677.90 -59.9 -58.0 -58.7 64 -99 SPO 1997 10 16 06 18 63 3.8 -9 677.80 -59.9 -58.0 -58.7 65 -99 SPO 1997 10 16 06 19 63 3.8 -9 677.80 -59.8 -58.1 -58.7 64 -99 SPO 1997 10 16 06 20 62 3.7 -9 677.80 -59.8 -58.0 -58.7 64 -99 SPO 1997 10 16 06 21 61 3.7 -9 677.90 -59.9 -58.0 -58.7 65 -99 SPO 1997 10 16 06 22 60 3.7 -9 677.90 -59.8 -58.0 -58.6 64 -99 SPO 1997 10 16 06 23 60 3.8 -9 677.80 -59.8 -57.9 -58.6 64 -99 SPO 1997 10 16 06 24 59 3.9 -9 677.80 -59.8 -57.9 -58.6 63 -99 SPO 1997 10 16 06 25 59 3.9 -9 677.80 -59.7 -57.9 -58.6 63 -99 SPO 1997 10 16 06 26 58 3.8 -9 677.80 -59.7 -57.8 -58.5 63 -99 SPO 1997 10 16 06 27 56 3.7 -9 677.80 -59.7 -57.9 -58.5 64 -99 SPO 1997 10 16 06 28 56 3.8 -9 677.80 -59.7 -57.9 -58.4 64 -99 SPO 1997 10 16 06 29 54 3.8 -9 677.80 -59.7 -57.8 -58.4 64 -99 SPO 1997 10 16 06 30 53 3.9 -9 677.80 -59.6 -57.8 -58.4 64 -99 SPO 1997 10 16 06 31 52 3.8 -9 677.80 -59.6 -57.8 -58.5 64 -99 SPO 1997 10 16 06 32 52 3.9 -9 677.80 -59.6 -57.9 -58.5 64 -99 SPO 1997 10 16 06 33 52 4.0 -9 677.80 -59.6 -57.8 -58.6 64 -99 SPO 1997 10 16 06 34 52 4.1 -9 677.80 -59.6 -57.8 -58.6 64 -99 SPO 1997 10 16 06 35 51 4.2 -9 677.80 -59.6 -57.8 -58.7 64 -99 SPO 1997 10 16 06 36 52 4.2 -9 677.80 -59.7 -57.8 -58.7 64 -99 SPO 1997 10 16 06 37 53 4.2 -9 677.80 -59.7 -57.7 -58.8 64 -99 SPO 1997 10 16 06 38 53 4.2 -9 677.80 -59.6 -57.6 -58.7 64 -99 SPO 1997 10 16 06 39 52 4.1 -9 677.80 -59.6 -57.6 -58.7 64 -99 SPO 1997 10 16 06 40 51 4.1 -9 677.80 -59.6 -57.6 -58.6 64 -99 SPO 1997 10 16 06 41 50 4.1 -9 677.80 -59.6 -57.7 -58.6 64 -99 SPO 1997 10 16 06 42 51 4.1 -9 677.80 -59.6 -57.7 -58.6 64 -99 SPO 1997 10 16 06 43 49 4.2 -9 677.80 -59.6 -57.7 -58.6 64 -99 SPO 1997 10 16 06 44 48 4.2 -9 677.70 -59.6 -57.7 -58.5 64 -99 SPO 1997 10 16 06 45 47 4.3 -9 677.70 -59.6 -57.6 -58.5 64 -99 SPO 1997 10 16 06 46 47 4.4 -9 677.70 -59.6 -57.6 -58.6 64 -99 SPO 1997 10 16 06 47 47 4.4 -9 677.70 -59.6 -57.5 -58.7 64 -99 SPO 1997 10 16 06 48 46 4.4 -9 677.70 -59.6 -57.4 -58.6 64 -99 SPO 1997 10 16 06 49 45 4.5 -9 677.70 -59.5 -57.4 -58.5 63 -99 SPO 1997 10 16 06 50 44 4.4 -9 677.70 -59.4 -57.4 -58.5 63 -99 SPO 1997 10 16 06 51 44 4.4 -9 677.60 -59.4 -57.3 -58.6 64 -99 SPO 1997 10 16 06 52 44 4.4 -9 677.70 -59.4 -57.3 -58.5 64 -99 SPO 1997 10 16 06 53 45 4.4 -9 677.70 -59.4 -57.2 -58.4 65 -99 SPO 1997 10 16 06 54 46 4.5 -9 677.70 -59.3 -57.2 -58.4 65 -99 SPO 1997 10 16 06 55 45 4.4 -9 677.70 -59.3 -57.2 -58.3 65 -99 SPO 1997 10 16 06 56 44 4.5 -9 677.70 -59.3 -57.2 -58.3 65 -99 SPO 1997 10 16 06 57 45 4.4 -9 677.70 -59.2 -57.3 -58.2 64 -99 SPO 1997 10 16 06 58 45 4.3 -9 677.70 -59.2 -57.3 -58.2 64 -99 SPO 1997 10 16 06 59 45 4.3 -9 677.70 -59.2 -57.3 -58.2 64 -99 SPO 1997 10 16 07 00 48 4.1 -9 677.70 -59.2 -57.4 -58.1 64 0 SPO 1997 10 16 07 01 49 4.0 -9 677.80 -59.2 -57.4 -58.1 65 -99 SPO 1997 10 16 07 02 50 4.0 -9 677.80 -59.2 -57.4 -58.1 65 -99 SPO 1997 10 16 07 03 51 4.0 -9 677.80 -59.2 -57.5 -58.1 65 -99 SPO 1997 10 16 07 04 52 3.9 -9 677.80 -59.3 -57.6 -58.2 66 -99 SPO 1997 10 16 07 05 54 4.0 -9 677.70 -59.3 -57.6 -58.2 66 -99 SPO 1997 10 16 07 06 55 3.9 -9 677.70 -59.3 -57.6 -58.2 66 -99 SPO 1997 10 16 07 07 55 3.7 -9 677.70 -59.4 -57.6 -58.2 66 -99 SPO 1997 10 16 07 08 56 3.8 -9 677.70 -59.4 -57.8 -58.3 65 -99 SPO 1997 10 16 07 09 57 3.8 -9 677.70 -59.4 -57.8 -58.2 65 -99 SPO 1997 10 16 07 10 57 3.7 -9 677.70 -59.4 -57.7 -58.2 65 -99 SPO 1997 10 16 07 11 58 3.7 -9 677.70 -59.4 -57.8 -58.2 64 -99 SPO 1997 10 16 07 12 59 3.7 -9 677.70 -59.5 -57.8 -58.3 64 -99 SPO 1997 10 16 07 13 58 3.7 -9 677.70 -59.6 -58.0 -58.4 65 -99 SPO 1997 10 16 07 14 56 3.7 -9 677.70 -59.7 -58.0 -58.5 66 -99 SPO 1997 10 16 07 15 57 3.6 -9 677.70 -59.7 -58.1 -58.5 66 -99 SPO 1997 10 16 07 16 57 3.7 -9 677.70 -59.7 -58.1 -58.5 66 -99 SPO 1997 10 16 07 17 58 3.7 -9 677.70 -59.7 -58.0 -58.4 66 -99 SPO 1997 10 16 07 18 58 3.8 -9 677.70 -59.7 -57.9 -58.5 64 -99 SPO 1997 10 16 07 19 59 3.8 -9 677.70 -59.7 -57.9 -58.4 64 -99 SPO 1997 10 16 07 20 58 3.6 -9 677.70 -59.7 -58.0 -58.4 64 -99 SPO 1997 10 16 07 21 57 3.6 -9 677.80 -59.7 -58.0 -58.4 64 -99 SPO 1997 10 16 07 22 57 3.6 -9 677.80 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 07 23 56 3.7 -9 677.70 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 07 24 55 3.7 -9 677.70 -59.7 -58.0 -58.3 63 -99 SPO 1997 10 16 07 25 55 3.7 -9 677.70 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 07 26 54 3.6 -9 677.70 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 07 27 55 3.6 -9 677.80 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 07 28 54 3.5 -9 677.80 -59.7 -58.1 -58.2 64 -99 SPO 1997 10 16 07 29 54 3.4 -9 677.80 -59.7 -58.1 -58.2 64 -99 SPO 1997 10 16 07 30 54 3.4 -9 677.80 -59.7 -58.1 -58.2 65 -99 SPO 1997 10 16 07 31 55 3.3 -9 677.80 -59.7 -58.1 -58.2 65 -99 SPO 1997 10 16 07 32 54 3.3 -9 677.80 -59.7 -58.1 -58.1 66 -99 SPO 1997 10 16 07 33 53 3.2 -9 677.70 -59.6 -58.2 -58.1 64 -99 SPO 1997 10 16 07 34 52 3.2 -9 677.80 -59.6 -58.2 -58.0 64 -99 SPO 1997 10 16 07 35 51 3.1 -9 677.80 -59.7 -58.3 -58.0 64 -99 SPO 1997 10 16 07 36 51 3.1 -9 677.80 -59.6 -58.3 -58.0 64 -99 SPO 1997 10 16 07 37 52 3.0 -9 677.80 -59.6 -58.3 -58.0 64 -99 SPO 1997 10 16 07 38 53 3.1 -9 677.70 -59.7 -58.3 -58.0 65 -99 SPO 1997 10 16 07 39 52 3.0 -9 677.80 -59.7 -58.3 -58.0 65 -99 SPO 1997 10 16 07 40 53 3.0 -9 677.80 -59.7 -58.3 -58.0 66 -99 SPO 1997 10 16 07 41 55 3.0 -9 677.80 -59.7 -58.3 -57.9 66 -99 SPO 1997 10 16 07 42 55 3.0 -9 677.80 -59.7 -58.3 -57.9 66 -99 SPO 1997 10 16 07 43 55 3.0 -9 677.80 -59.7 -58.3 -57.9 66 -99 SPO 1997 10 16 07 44 54 3.0 -9 677.80 -59.8 -58.3 -57.9 66 -99 SPO 1997 10 16 07 45 54 3.1 -9 677.80 -59.8 -58.3 -58.0 65 -99 SPO 1997 10 16 07 46 54 3.1 -9 677.80 -59.8 -58.4 -58.0 65 -99 SPO 1997 10 16 07 47 54 3.1 -9 677.80 -59.8 -58.3 -58.0 65 -99 SPO 1997 10 16 07 48 56 3.2 -9 677.80 -59.8 -58.3 -58.0 64 -99 SPO 1997 10 16 07 49 58 3.3 -9 677.80 -59.8 -58.3 -58.1 65 -99 SPO 1997 10 16 07 50 58 3.4 -9 677.80 -59.8 -58.2 -58.1 65 -99 SPO 1997 10 16 07 51 59 3.3 -9 677.80 -59.9 -58.2 -58.1 67 -99 SPO 1997 10 16 07 52 61 3.3 -9 677.80 -59.9 -58.2 -58.1 66 -99 SPO 1997 10 16 07 53 61 3.4 -9 677.80 -59.8 -58.2 -58.2 65 -99 SPO 1997 10 16 07 54 61 3.4 -9 677.80 -59.9 -58.3 -58.1 66 -99 SPO 1997 10 16 07 55 61 3.5 -9 677.80 -59.8 -58.3 -58.2 65 -99 SPO 1997 10 16 07 56 61 3.6 -9 677.80 -59.8 -58.3 -58.2 65 -99 SPO 1997 10 16 07 57 60 3.7 -9 677.80 -59.8 -58.2 -58.2 66 -99 SPO 1997 10 16 07 58 59 3.8 -9 677.80 -59.8 -58.2 -58.3 66 -99 SPO 1997 10 16 07 59 57 3.8 -9 677.80 -59.8 -58.2 -58.3 65 -99 SPO 1997 10 16 08 00 56 3.7 -9 677.80 -59.8 -58.2 -58.3 65 0 SPO 1997 10 16 08 01 55 3.6 -9 677.80 -59.8 -58.2 -58.3 64 -99 SPO 1997 10 16 08 02 55 3.7 -9 677.80 -59.8 -58.2 -58.3 64 -99 SPO 1997 10 16 08 03 55 3.5 -9 677.80 -59.8 -58.2 -58.3 65 -99 SPO 1997 10 16 08 04 55 3.6 -9 677.70 -59.8 -58.2 -58.3 65 -99 SPO 1997 10 16 08 05 55 3.5 -9 677.70 -59.8 -58.2 -58.3 66 -99 SPO 1997 10 16 08 06 53 3.5 -9 677.70 -59.8 -58.2 -58.2 65 -99 SPO 1997 10 16 08 07 53 3.4 -9 677.70 -59.8 -58.2 -58.2 65 -99 SPO 1997 10 16 08 08 52 3.4 -9 677.70 -59.8 -58.2 -58.2 66 -99 SPO 1997 10 16 08 09 52 3.6 -9 677.70 -59.8 -58.2 -58.2 66 -99 SPO 1997 10 16 08 10 52 3.7 -9 677.70 -59.8 -58.0 -58.2 66 -99 SPO 1997 10 16 08 11 50 3.7 -9 677.70 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 08 12 50 3.6 -9 677.70 -59.7 -58.0 -58.3 64 -99 SPO 1997 10 16 08 13 50 3.7 -9 677.70 -59.6 -58.0 -58.3 64 -99 SPO 1997 10 16 08 14 50 4.0 -9 677.60 -59.6 -58.0 -58.3 64 -99 SPO 1997 10 16 08 15 50 3.9 -9 677.60 -59.6 -57.9 -58.3 65 -99 SPO 1997 10 16 08 16 50 3.9 -9 677.60 -59.7 -57.8 -58.3 66 -99 SPO 1997 10 16 08 17 50 3.8 -9 677.60 -59.7 -57.8 -58.3 66 -99 SPO 1997 10 16 08 18 48 4.0 -9 677.60 -59.8 -57.8 -58.4 67 -99 SPO 1997 10 16 08 19 47 4.1 -9 677.60 -59.8 -57.8 -58.4 66 -99 SPO 1997 10 16 08 20 50 3.9 -9 677.60 -59.6 -57.8 -58.4 65 -99 SPO 1997 10 16 08 21 51 3.9 -9 677.60 -59.8 -57.8 -58.5 67 -99 SPO 1997 10 16 08 22 53 3.9 -9 677.60 -59.8 -57.8 -58.5 67 -99 SPO 1997 10 16 08 23 55 3.8 -9 677.60 -59.8 -57.8 -58.4 66 -99 SPO 1997 10 16 08 24 54 3.9 -9 677.60 -59.8 -57.7 -58.4 66 -99 SPO 1997 10 16 08 25 55 3.9 -9 677.60 -59.8 -57.7 -58.4 65 -99 SPO 1997 10 16 08 26 55 4.1 -9 677.60 -59.8 -57.7 -58.4 65 -99 SPO 1997 10 16 08 27 55 4.2 -9 677.60 -59.8 -57.7 -58.4 65 -99 SPO 1997 10 16 08 28 54 4.2 -9 677.60 -59.8 -57.7 -58.4 65 -99 SPO 1997 10 16 08 29 55 4.4 -9 677.60 -59.8 -57.6 -58.4 65 -99 SPO 1997 10 16 08 30 57 4.1 -9 677.60 -59.8 -57.5 -58.4 65 -99 SPO 1997 10 16 08 31 58 4.1 -9 677.60 -59.8 -57.5 -58.5 65 -99 SPO 1997 10 16 08 32 57 4.2 -9 677.60 -59.8 -57.6 -58.5 65 -99 SPO 1997 10 16 08 33 57 4.2 -9 677.60 -59.8 -57.5 -58.5 65 -99 SPO 1997 10 16 08 34 55 4.0 -9 677.60 -59.8 -57.4 -58.5 64 -99 SPO 1997 10 16 08 35 54 4.1 -9 677.60 -59.8 -57.4 -58.5 64 -99 SPO 1997 10 16 08 36 55 3.9 -9 677.60 -59.8 -57.4 -58.5 63 -99 SPO 1997 10 16 08 37 56 3.9 -9 677.60 -59.8 -57.4 -58.5 63 -99 SPO 1997 10 16 08 38 57 4.0 -9 677.60 -59.8 -57.5 -58.5 64 -99 SPO 1997 10 16 08 39 56 3.8 -9 677.60 -59.8 -57.4 -58.4 64 -99 SPO 1997 10 16 08 40 56 3.7 -9 677.60 -59.9 -57.4 -58.4 65 -99 SPO 1997 10 16 08 41 56 3.8 -9 677.60 -59.9 -57.4 -58.4 65 -99 SPO 1997 10 16 08 42 56 3.8 -9 677.60 -59.9 -57.4 -58.4 65 -99 SPO 1997 10 16 08 43 57 3.9 -9 677.60 -59.9 -57.3 -58.5 66 -99 SPO 1997 10 16 08 44 56 3.9 -9 677.60 -59.9 -57.3 -58.5 66 -99 SPO 1997 10 16 08 45 56 3.9 -9 677.60 -59.9 -57.4 -58.5 65 -99 SPO 1997 10 16 08 46 57 4.0 -9 677.60 -59.9 -57.3 -58.5 64 -99 SPO 1997 10 16 08 47 58 3.9 -9 677.60 -59.9 -57.2 -58.5 64 -99 SPO 1997 10 16 08 48 59 4.0 -9 677.60 -60.0 -57.2 -58.6 64 -99 SPO 1997 10 16 08 49 59 4.0 -9 677.60 -60.0 -57.2 -58.6 64 -99 SPO 1997 10 16 08 50 59 4.0 -9 677.60 -60.0 -57.1 -58.6 64 -99 SPO 1997 10 16 08 51 60 4.1 -9 677.60 -60.0 -57.1 -58.6 64 -99 SPO 1997 10 16 08 52 60 4.1 -9 677.60 -60.0 -57.0 -58.6 64 -99 SPO 1997 10 16 08 53 61 4.1 -9 677.60 -60.0 -57.1 -58.6 64 -99 SPO 1997 10 16 08 54 62 4.2 -9 677.60 -60.0 -57.1 -58.6 64 -99 SPO 1997 10 16 08 55 61 4.0 -9 677.60 -59.9 -57.3 -58.7 64 -99 SPO 1997 10 16 08 56 60 4.1 -9 677.60 -60.0 -57.2 -58.7 65 -99 SPO 1997 10 16 08 57 60 4.2 -9 677.60 -60.0 -57.2 -58.7 65 -99 SPO 1997 10 16 08 58 60 4.1 -9 677.60 -60.0 -57.2 -58.7 65 -99 SPO 1997 10 16 08 59 60 4.1 -9 677.60 -60.0 -57.2 -58.7 64 -99 SPO 1997 10 16 09 00 60 4.2 -9 677.60 -60.0 -57.1 -58.7 64 0 SPO 1997 10 16 09 01 60 4.3 -9 677.60 -60.0 -57.1 -58.7 64 -99 SPO 1997 10 16 09 02 60 4.3 -9 677.60 -59.9 -57.0 -58.7 63 -99 SPO 1997 10 16 09 03 60 4.3 -9 677.60 -59.9 -57.0 -58.7 63 -99 SPO 1997 10 16 09 04 60 4.3 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 05 61 4.4 -9 677.60 -59.9 -56.9 -58.7 64 -99 SPO 1997 10 16 09 06 61 4.3 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 07 60 4.4 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 08 58 4.3 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 09 57 4.3 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 10 55 4.4 -9 677.60 -59.9 -57.0 -58.7 63 -99 SPO 1997 10 16 09 11 54 4.5 -9 677.60 -59.9 -57.0 -58.7 63 -99 SPO 1997 10 16 09 12 54 4.5 -9 677.60 -59.9 -57.0 -58.8 63 -99 SPO 1997 10 16 09 13 54 4.4 -9 677.60 -59.9 -57.1 -58.7 63 -99 SPO 1997 10 16 09 14 54 4.6 -9 677.60 -59.9 -57.0 -58.7 63 -99 SPO 1997 10 16 09 15 53 4.6 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 16 53 4.5 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 17 53 4.3 -9 677.60 -59.9 -57.0 -58.7 64 -99 SPO 1997 10 16 09 18 53 4.4 -9 677.60 -59.9 -57.1 -58.7 64 -99 SPO 1997 10 16 09 19 52 4.2 -9 677.60 -59.9 -57.0 -58.6 64 -99 SPO 1997 10 16 09 20 53 4.3 -9 677.60 -59.9 -57.0 -58.6 64 -99 SPO 1997 10 16 09 21 53 4.1 -9 677.60 -59.8 -57.0 -58.5 64 -99 SPO 1997 10 16 09 22 56 4.0 -9 677.60 -59.8 -57.0 -58.5 64 -99 SPO 1997 10 16 09 23 57 4.0 -9 677.60 -59.8 -56.9 -58.5 64 -99 SPO 1997 10 16 09 24 57 4.0 -9 677.60 -59.8 -56.9 -58.5 64 -99 SPO 1997 10 16 09 25 57 4.1 -9 677.60 -59.8 -56.9 -58.5 64 -99 SPO 1997 10 16 09 26 57 4.1 -9 677.60 -59.8 -56.9 -58.5 64 -99 SPO 1997 10 16 09 27 56 4.2 -9 677.60 -59.9 -56.9 -58.5 64 -99 SPO 1997 10 16 09 28 56 4.3 -9 677.60 -59.9 -57.0 -58.5 65 -99 SPO 1997 10 16 09 29 56 4.3 -9 677.60 -59.8 -57.0 -58.5 64 -99 SPO 1997 10 16 09 30 57 4.2 -9 677.60 -59.9 -57.0 -58.5 66 -99 SPO 1997 10 16 09 31 57 4.2 -9 677.60 -59.9 -57.1 -58.5 66 -99 SPO 1997 10 16 09 32 56 4.2 -9 677.60 -59.9 -57.1 -58.5 65 -99 SPO 1997 10 16 09 33 55 4.2 -9 677.60 -60.0 -57.1 -58.5 67 -99 SPO 1997 10 16 09 34 54 4.2 -9 677.60 -60.0 -57.1 -58.6 67 -99 SPO 1997 10 16 09 35 53 4.2 -9 677.60 -60.0 -57.1 -58.6 66 -99 SPO 1997 10 16 09 36 53 4.2 -9 677.60 -60.0 -57.1 -58.6 66 -99 SPO 1997 10 16 09 37 53 4.1 -9 677.60 -60.0 -57.2 -58.6 65 -99 SPO 1997 10 16 09 38 55 4.0 -9 677.60 -60.0 -57.2 -58.5 65 -99 SPO 1997 10 16 09 39 56 4.0 -9 677.60 -59.9 -57.2 -58.5 64 -99 SPO 1997 10 16 09 40 56 4.0 -9 677.60 -59.9 -57.2 -58.4 65 -99 SPO 1997 10 16 09 41 56 3.9 -9 677.60 -59.9 -57.2 -58.4 65 -99 SPO 1997 10 16 09 42 57 3.9 -9 677.60 -59.9 -57.2 -58.5 65 -99 SPO 1997 10 16 09 43 57 3.8 -9 677.60 -59.9 -57.3 -58.4 65 -99 SPO 1997 10 16 09 44 59 3.8 -9 677.60 -59.8 -57.3 -58.4 64 -99 SPO 1997 10 16 09 45 59 3.8 -9 677.60 -59.9 -57.4 -58.4 65 -99 SPO 1997 10 16 09 46 60 3.8 -9 677.60 -59.9 -57.4 -58.4 65 -99 SPO 1997 10 16 09 47 60 3.8 -9 677.60 -59.9 -57.4 -58.4 64 -99 SPO 1997 10 16 09 48 60 3.9 -9 677.50 -59.9 -57.4 -58.4 64 -99 SPO 1997 10 16 09 49 60 3.9 -9 677.50 -59.9 -57.5 -58.5 64 -99 SPO 1997 10 16 09 50 60 4.0 -9 677.50 -59.9 -57.4 -58.5 64 -99 SPO 1997 10 16 09 51 60 4.1 -9 677.50 -59.9 -57.4 -58.5 64 -99 SPO 1997 10 16 09 52 59 4.1 -9 677.50 -59.9 -57.4 -58.5 64 -99 SPO 1997 10 16 09 53 60 4.0 -9 677.50 -59.9 -57.3 -58.5 64 -99 SPO 1997 10 16 09 54 60 4.0 -9 677.50 -59.9 -57.4 -58.5 64 -99 SPO 1997 10 16 09 55 60 4.0 -9 677.50 -59.9 -57.4 -58.5 64 -99 SPO 1997 10 16 09 56 60 4.0 -9 677.60 -59.9 -57.3 -58.5 64 -99 SPO 1997 10 16 09 57 59 4.0 -9 677.60 -59.9 -57.3 -58.5 64 -99 SPO 1997 10 16 09 58 59 4.0 -9 677.60 -60.0 -57.2 -58.5 65 -99 SPO 1997 10 16 09 59 57 4.0 -9 677.60 -60.0 -57.2 -58.6 64 -99 SPO 1997 10 16 10 00 56 4.0 -9 677.60 -60.0 -57.2 -58.6 64 0 SPO 1997 10 16 10 01 55 4.1 -9 677.60 -60.0 -57.2 -58.6 63 -99 SPO 1997 10 16 10 02 54 4.0 -9 677.60 -60.0 -57.2 -58.7 63 -99 SPO 1997 10 16 10 03 54 4.2 -9 677.50 -60.0 -57.2 -58.7 63 -99 SPO 1997 10 16 10 04 55 4.2 -9 677.50 -60.1 -57.1 -58.7 64 -99 SPO 1997 10 16 10 05 55 4.2 -9 677.50 -60.1 -57.1 -58.7 64 -99 SPO 1997 10 16 10 06 55 4.2 -9 677.50 -60.1 -57.1 -58.7 64 -99 SPO 1997 10 16 10 07 56 4.1 -9 677.50 -60.1 -57.1 -58.7 64 -99 SPO 1997 10 16 10 08 58 4.0 -9 677.50 -60.2 -57.1 -58.8 65 -99 SPO 1997 10 16 10 09 59 4.0 -9 677.50 -60.2 -57.1 -58.7 64 -99 SPO 1997 10 16 10 10 61 3.8 -9 677.60 -60.2 -57.1 -58.7 64 -99 SPO 1997 10 16 10 11 63 3.8 -9 677.60 -60.3 -57.1 -58.6 64 -99 SPO 1997 10 16 10 12 64 3.8 -9 677.60 -60.3 -57.0 -58.6 63 -99 SPO 1997 10 16 10 13 64 3.7 -9 677.60 -60.4 -57.0 -58.6 63 -99 SPO 1997 10 16 10 14 63 3.9 -9 677.60 -60.4 -57.0 -58.6 63 -99 SPO 1997 10 16 10 15 63 3.9 -9 677.60 -60.5 -57.0 -58.6 63 -99 SPO 1997 10 16 10 16 62 3.8 -9 677.60 -60.5 -57.0 -58.7 63 -99 SPO 1997 10 16 10 17 60 4.0 -9 677.60 -60.5 -57.0 -58.8 62 -99 SPO 1997 10 16 10 18 59 4.0 -9 677.60 -60.6 -57.1 -58.9 63 -99 SPO 1997 10 16 10 19 58 4.0 -9 677.60 -60.6 -57.2 -59.0 63 -99 SPO 1997 10 16 10 20 58 4.0 -9 677.60 -60.6 -57.2 -59.1 63 -99 SPO 1997 10 16 10 21 58 4.1 -9 677.60 -60.6 -57.2 -59.0 63 -99 SPO 1997 10 16 10 22 60 4.0 -9 677.60 -60.5 -57.2 -59.0 62 -99 SPO 1997 10 16 10 23 61 4.0 -9 677.60 -60.5 -57.1 -58.9 63 -99 SPO 1997 10 16 10 24 62 4.1 -9 677.60 -60.5 -57.2 -58.9 63 -99 SPO 1997 10 16 10 25 64 4.0 -9 677.60 -60.5 -57.2 -58.9 62 -99 SPO 1997 10 16 10 26 62 4.1 -9 677.60 -60.5 -57.2 -59.0 62 -99 SPO 1997 10 16 10 27 62 4.1 -9 677.60 -60.5 -57.2 -59.0 62 -99 SPO 1997 10 16 10 28 62 4.1 -9 677.60 -60.6 -57.2 -59.0 63 -99 SPO 1997 10 16 10 29 61 4.1 -9 677.60 -60.6 -57.1 -59.1 63 -99 SPO 1997 10 16 10 30 59 4.1 -9 677.60 -60.6 -57.2 -59.1 63 -99 SPO 1997 10 16 10 31 58 4.0 -9 677.60 -60.6 -57.2 -59.0 63 -99 SPO 1997 10 16 10 32 60 4.2 -9 677.60 -60.6 -57.2 -59.1 63 -99 SPO 1997 10 16 10 33 59 4.0 -9 677.60 -60.5 -57.2 -59.1 63 -99 SPO 1997 10 16 10 34 58 4.1 -9 677.60 -60.5 -57.1 -59.1 63 -99 SPO 1997 10 16 10 35 57 4.2 -9 677.50 -60.5 -57.1 -59.1 63 -99 SPO 1997 10 16 10 36 56 4.2 -9 677.50 -60.5 -57.1 -59.1 62 -99 SPO 1997 10 16 10 37 56 4.2 -9 677.50 -60.4 -57.1 -59.0 62 -99 SPO 1997 10 16 10 38 57 4.3 -9 677.50 -60.4 -57.1 -59.0 62 -99 SPO 1997 10 16 10 39 59 4.3 -9 677.50 -60.4 -57.0 -59.0 61 -99 SPO 1997 10 16 10 40 60 4.2 -9 677.50 -60.4 -57.0 -59.1 62 -99 SPO 1997 10 16 10 41 61 4.1 -9 677.50 -60.4 -57.1 -59.1 63 -99 SPO 1997 10 16 10 42 61 4.3 -9 677.50 -60.4 -57.0 -59.1 63 -99 SPO 1997 10 16 10 43 61 4.2 -9 677.50 -60.4 -57.0 -59.1 63 -99 SPO 1997 10 16 10 44 61 4.1 -9 677.50 -60.4 -57.0 -59.2 63 -99 SPO 1997 10 16 10 45 60 4.2 -9 677.50 -60.4 -57.0 -59.1 63 -99 SPO 1997 10 16 10 46 62 4.2 -9 677.50 -60.4 -57.0 -59.1 63 -99 SPO 1997 10 16 10 47 61 4.3 -9 677.50 -60.4 -57.0 -59.2 63 -99 SPO 1997 10 16 10 48 61 4.4 -9 677.50 -60.4 -57.0 -59.2 63 -99 SPO 1997 10 16 10 49 63 4.3 -9 677.50 -60.4 -57.0 -59.2 63 -99 SPO 1997 10 16 10 50 64 4.5 -9 677.50 -60.3 -57.0 -59.1 63 -99 SPO 1997 10 16 10 51 65 4.4 -9 677.50 -60.3 -57.0 -59.1 62 -99 SPO 1997 10 16 10 52 62 4.8 -9 677.50 -60.4 -57.1 -59.1 63 -99 SPO 1997 10 16 10 53 60 4.7 -9 677.50 -60.3 -57.0 -59.1 63 -99 SPO 1997 10 16 10 54 59 4.7 -9 677.50 -60.3 -57.0 -59.1 63 -99 SPO 1997 10 16 10 55 56 4.7 -9 677.50 -60.3 -57.1 -59.1 63 -99 SPO 1997 10 16 10 56 57 4.7 -9 677.50 -60.2 -57.1 -59.0 64 -99 SPO 1997 10 16 10 57 59 4.8 -9 677.50 -60.2 -57.0 -59.0 64 -99 SPO 1997 10 16 10 58 59 4.6 -9 677.50 -60.2 -57.0 -59.0 64 -99 SPO 1997 10 16 10 59 61 4.6 -9 677.50 -60.1 -57.1 -59.0 64 -99 SPO 1997 10 16 11 00 60 4.4 -9 677.50 -60.1 -57.1 -59.0 64 0 SPO 1997 10 16 11 01 58 4.5 -9 677.50 -60.1 -57.1 -59.0 64 -99 SPO 1997 10 16 11 02 58 4.4 -9 677.50 -60.1 -57.2 -58.9 64 -99 SPO 1997 10 16 11 03 59 4.2 -9 677.50 -60.1 -57.2 -58.9 63 -99 SPO 1997 10 16 11 04 58 4.6 -9 677.50 -60.1 -57.1 -58.9 63 -99 SPO 1997 10 16 11 05 57 4.5 -9 677.50 -60.1 -57.2 -58.9 64 -99 SPO 1997 10 16 11 06 58 4.5 -9 677.50 -60.1 -57.2 -58.9 64 -99 SPO 1997 10 16 11 07 59 4.5 -9 677.50 -60.0 -57.1 -59.0 64 -99 SPO 1997 10 16 11 08 59 4.5 -9 677.50 -60.1 -57.1 -59.0 65 -99 SPO 1997 10 16 11 09 59 4.5 -9 677.50 -60.1 -57.1 -59.0 64 -99 SPO 1997 10 16 11 10 59 4.3 -9 677.50 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 11 59 4.4 -9 677.50 -60.0 -57.3 -59.0 64 -99 SPO 1997 10 16 11 12 59 4.3 -9 677.50 -60.1 -57.2 -59.0 65 -99 SPO 1997 10 16 11 13 58 4.5 -9 677.50 -60.1 -57.3 -59.0 65 -99 SPO 1997 10 16 11 14 58 4.5 -9 677.50 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 15 57 4.5 -9 677.50 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 16 58 4.7 -9 677.50 -60.1 -57.0 -59.0 64 -99 SPO 1997 10 16 11 17 57 4.6 -9 677.50 -60.1 -57.0 -59.0 64 -99 SPO 1997 10 16 11 18 59 4.6 -9 677.50 -60.0 -56.8 -59.0 64 -99 SPO 1997 10 16 11 19 58 4.4 -9 677.50 -60.0 -57.0 -59.0 64 -99 SPO 1997 10 16 11 20 60 4.7 -9 677.50 -60.0 -57.0 -59.0 64 -99 SPO 1997 10 16 11 21 60 4.3 -9 677.50 -60.0 -57.0 -59.0 65 -99 SPO 1997 10 16 11 22 61 4.2 -9 677.50 -60.1 -57.0 -59.0 66 -99 SPO 1997 10 16 11 23 61 4.2 -9 677.50 -60.1 -57.1 -59.0 65 -99 SPO 1997 10 16 11 24 60 4.2 -9 677.50 -60.1 -57.1 -59.0 65 -99 SPO 1997 10 16 11 25 60 4.2 -9 677.40 -60.1 -57.1 -59.0 64 -99 SPO 1997 10 16 11 26 61 4.2 -9 677.50 -60.1 -57.0 -59.0 64 -99 SPO 1997 10 16 11 27 60 4.2 -9 677.50 -60.1 -57.1 -59.0 64 -99 SPO 1997 10 16 11 28 60 4.2 -9 677.40 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 29 60 4.1 -9 677.40 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 30 60 4.3 -9 677.50 -60.1 -57.2 -59.0 64 -99 SPO 1997 10 16 11 31 59 4.4 -9 677.40 -60.0 -57.2 -59.0 64 -99 SPO 1997 10 16 11 32 61 4.4 -9 677.40 -60.0 -57.2 -58.9 64 -99 SPO 1997 10 16 11 33 61 4.3 -9 677.40 -60.0 -57.4 -58.9 65 -99 SPO 1997 10 16 11 34 63 4.6 -9 677.40 -60.0 -57.2 -58.9 65 -99 SPO 1997 10 16 11 35 62 4.4 -9 677.40 -60.0 -57.2 -59.0 66 -99 SPO 1997 10 16 11 36 62 4.4 -9 677.40 -60.0 -57.3 -59.0 66 -99 SPO 1997 10 16 11 37 63 4.3 -9 677.40 -60.0 -57.3 -59.0 65 -99 SPO 1997 10 16 11 38 63 4.2 -9 677.40 -60.0 -57.3 -59.0 64 -99 SPO 1997 10 16 11 39 62 4.2 -9 677.40 -60.0 -57.3 -59.0 64 -99 SPO 1997 10 16 11 40 63 4.1 -9 677.40 -60.1 -57.3 -59.0 64 -99 SPO 1997 10 16 11 41 64 4.0 -9 677.40 -60.0 -57.3 -59.1 63 -99 SPO 1997 10 16 11 42 65 4.0 -9 677.40 -60.1 -57.4 -59.0 64 -99 SPO 1997 10 16 11 43 66 4.0 -9 677.40 -60.1 -57.5 -59.1 64 -99 SPO 1997 10 16 11 44 66 4.2 -9 677.30 -60.2 -57.5 -59.1 65 -99 SPO 1997 10 16 11 45 66 4.3 -9 677.30 -60.1 -57.5 -59.2 64 -99 SPO 1997 10 16 11 46 66 4.1 -9 677.30 -60.2 -57.6 -59.2 64 -99 SPO 1997 10 16 11 47 67 4.1 -9 677.30 -60.2 -57.6 -59.2 64 -99 SPO 1997 10 16 11 48 67 4.2 -9 677.30 -60.2 -57.6 -59.1 64 -99 SPO 1997 10 16 11 49 66 4.1 -9 677.30 -60.2 -57.6 -59.1 64 -99 SPO 1997 10 16 11 50 65 3.9 -9 677.30 -60.2 -57.6 -59.1 64 -99 SPO 1997 10 16 11 51 66 4.1 -9 677.30 -60.2 -57.6 -59.1 64 -99 SPO 1997 10 16 11 52 65 4.2 -9 677.30 -60.2 -57.4 -59.2 64 -99 SPO 1997 10 16 11 53 65 4.1 -9 677.30 -60.3 -57.4 -59.1 63 -99 SPO 1997 10 16 11 54 63 4.0 -9 677.30 -60.2 -57.3 -59.1 64 -99 SPO 1997 10 16 11 55 64 4.0 -9 677.30 -60.2 -57.4 -59.1 64 -99 SPO 1997 10 16 11 56 64 3.8 -9 677.30 -60.2 -57.5 -59.1 64 -99 SPO 1997 10 16 11 57 65 3.7 -9 677.30 -60.2 -57.6 -59.0 64 -99 SPO 1997 10 16 11 58 64 3.8 -9 677.30 -60.2 -57.8 -59.0 64 -99 SPO 1997 10 16 11 59 64 4.0 -9 677.30 -60.2 -57.7 -59.1 64 -99 SPO 1997 10 16 12 00 65 4.1 -9 677.30 -60.2 -57.6 -59.1 64 0 SPO 1997 10 16 12 01 62 3.9 -9 677.30 -60.2 -57.5 -59.1 64 -99 SPO 1997 10 16 12 02 61 3.6 -9 677.30 -60.2 -57.8 -59.0 64 -99 SPO 1997 10 16 12 03 65 4.0 -9 677.30 -60.2 -57.6 -59.0 64 -99 SPO 1997 10 16 12 04 64 3.7 -9 677.30 -60.1 -57.6 -59.0 63 -99 SPO 1997 10 16 12 05 66 3.9 -9 677.30 -60.1 -57.6 -59.0 63 -99 SPO 1997 10 16 12 06 65 3.8 -9 677.30 -60.1 -57.4 -58.9 64 -99 SPO 1997 10 16 12 07 66 3.9 -9 677.30 -60.0 -57.4 -58.9 64 -99 SPO 1997 10 16 12 08 66 3.9 -9 677.30 -60.0 -57.4 -58.9 64 -99 SPO 1997 10 16 12 09 65 4.0 -9 677.30 -60.0 -57.3 -58.9 64 -99 SPO 1997 10 16 12 10 64 3.9 -9 677.30 -60.0 -57.4 -58.8 64 -99 SPO 1997 10 16 12 11 63 4.1 -9 677.30 -59.9 -57.5 -58.8 64 -99 SPO 1997 10 16 12 12 66 3.5 -9 677.30 -59.8 -57.6 -58.7 64 -99 SPO 1997 10 16 12 13 69 3.5 -9 677.30 -59.9 -57.6 -58.7 65 -99 SPO 1997 10 16 12 14 69 3.5 -9 677.30 -59.9 -57.6 -58.6 65 -99 SPO 1997 10 16 12 15 69 3.5 -9 677.30 -59.9 -57.6 -58.6 64 -99 SPO 1997 10 16 12 16 69 3.7 -9 677.30 -59.9 -57.6 -58.6 64 -99 SPO 1997 10 16 12 17 68 3.8 -9 677.30 -59.9 -57.4 -58.6 64 -99 SPO 1997 10 16 12 18 67 3.6 -9 677.30 -59.9 -57.5 -58.7 64 -99 SPO 1997 10 16 12 19 69 3.6 -9 677.30 -59.9 -57.5 -58.7 64 -99 SPO 1997 10 16 12 20 69 3.5 -9 677.30 -60.0 -57.7 -58.8 65 -99 SPO 1997 10 16 12 21 68 3.8 -9 677.30 -60.0 -57.5 -58.8 65 -99 SPO 1997 10 16 12 22 66 3.8 -9 677.20 -60.1 -57.6 -58.9 67 -99 SPO 1997 10 16 12 23 67 3.9 -9 677.20 -60.1 -57.4 -58.9 66 -99 SPO 1997 10 16 12 24 65 3.8 -9 677.20 -60.1 -57.5 -59.0 67 -99 SPO 1997 10 16 12 25 66 3.9 -9 677.20 -60.1 -57.4 -59.0 67 -99 SPO 1997 10 16 12 26 65 3.9 -9 677.20 -60.2 -57.4 -59.0 68 -99 SPO 1997 10 16 12 27 64 3.9 -9 677.20 -60.2 -57.4 -59.0 67 -99 SPO 1997 10 16 12 28 64 4.1 -9 677.20 -60.2 -57.2 -59.0 66 -99 SPO 1997 10 16 12 29 64 4.3 -9 677.20 -60.2 -57.2 -59.1 66 -99 SPO 1997 10 16 12 30 63 4.1 -9 677.20 -60.2 -57.2 -59.1 66 -99 SPO 1997 10 16 12 31 63 4.4 -9 677.20 -60.1 -57.2 -59.1 65 -99 SPO 1997 10 16 12 32 65 4.1 -9 677.10 -60.1 -57.2 -59.1 66 -99 SPO 1997 10 16 12 33 65 4.1 -9 677.20 -60.1 -57.0 -59.0 66 -99 SPO 1997 10 16 12 34 65 3.9 -9 677.10 -60.2 -57.0 -59.0 67 -99 SPO 1997 10 16 12 35 64 4.4 -9 677.20 -60.2 -56.9 -59.1 68 -99 SPO 1997 10 16 12 36 65 4.0 -9 677.20 -60.0 -57.0 -59.0 66 -99 SPO 1997 10 16 12 37 67 4.1 -9 677.20 -59.9 -57.0 -59.0 65 -99 SPO 1997 10 16 12 38 67 4.1 -9 677.20 -60.0 -56.9 -59.0 66 -99 SPO 1997 10 16 12 39 66 4.0 -9 677.20 -60.2 -57.2 -59.1 67 -99 SPO 1997 10 16 12 40 68 4.2 -9 677.20 -60.2 -57.1 -59.1 66 -99 SPO 1997 10 16 12 41 68 4.1 -9 677.20 -60.3 -57.2 -59.2 66 -99 SPO 1997 10 16 12 42 70 4.3 -9 677.20 -60.2 -57.1 -59.1 64 -99 SPO 1997 10 16 12 43 68 4.0 -9 677.20 -60.3 -57.2 -59.1 64 -99 SPO 1997 10 16 12 44 69 4.0 -9 677.20 -60.4 -57.2 -59.1 65 -99 SPO 1997 10 16 12 45 69 4.3 -9 677.20 -60.4 -57.3 -59.2 66 -99 SPO 1997 10 16 12 46 68 4.5 -9 677.20 -60.4 -57.2 -59.2 66 -99 SPO 1997 10 16 12 47 67 4.6 -9 677.20 -60.4 -57.1 -59.3 65 -99 SPO 1997 10 16 12 48 66 4.7 -9 677.20 -60.4 -57.1 -59.3 65 -99 SPO 1997 10 16 12 49 66 4.7 -9 677.10 -60.3 -57.1 -59.4 65 -99 SPO 1997 10 16 12 50 65 4.5 -9 677.20 -60.4 -57.1 -59.4 66 -99 SPO 1997 10 16 12 51 66 4.6 -9 677.10 -60.4 -57.1 -59.4 65 -99 SPO 1997 10 16 12 52 66 4.5 -9 677.20 -60.3 -57.0 -59.4 64 -99 SPO 1997 10 16 12 53 67 4.5 -9 677.10 -60.2 -57.0 -59.3 64 -99 SPO 1997 10 16 12 54 66 4.3 -9 677.20 -60.2 -57.2 -59.3 63 -99 SPO 1997 10 16 12 55 68 4.6 -9 677.20 -60.2 -57.1 -59.3 64 -99 SPO 1997 10 16 12 56 66 4.4 -9 677.10 -60.2 -57.2 -59.2 64 -99 SPO 1997 10 16 12 57 66 4.7 -9 677.10 -60.2 -57.0 -59.3 64 -99 SPO 1997 10 16 12 58 66 4.8 -9 677.10 -60.2 -57.0 -59.3 64 -99 SPO 1997 10 16 12 59 66 4.9 -9 677.10 -60.2 -57.0 -59.3 64 -99 SPO 1997 10 16 13 00 66 4.8 -9 677.10 -60.1 -57.0 -59.3 64 0 SPO 1997 10 16 13 01 65 4.7 -9 677.10 -60.2 -57.2 -59.3 65 -99 SPO 1997 10 16 13 02 66 4.9 -9 677.10 -60.2 -57.2 -59.4 65 -99 SPO 1997 10 16 13 03 66 4.8 -9 677.10 -60.1 -57.2 -59.3 65 -99 SPO 1997 10 16 13 04 66 4.9 -9 677.10 -60.1 -57.2 -59.3 64 -99 SPO 1997 10 16 13 05 65 5.0 -9 677.10 -60.1 -57.2 -59.3 64 -99 SPO 1997 10 16 13 06 65 5.1 -9 677.10 -60.0 -57.1 -59.3 64 -99 SPO 1997 10 16 13 07 64 5.1 -9 677.10 -59.9 -57.0 -59.2 63 -99 SPO 1997 10 16 13 08 64 4.9 -9 677.10 -59.9 -57.1 -59.2 63 -99 SPO 1997 10 16 13 09 64 5.0 -9 677.10 -59.9 -57.1 -59.2 64 -99 SPO 1997 10 16 13 10 63 4.9 -9 677.10 -60.0 -57.1 -59.3 65 -99 SPO 1997 10 16 13 11 63 5.0 -9 677.10 -60.0 -57.1 -59.3 65 -99 SPO 1997 10 16 13 12 63 4.9 -9 677.10 -60.0 -57.2 -59.3 64 -99 SPO 1997 10 16 13 13 63 5.1 -9 677.10 -60.0 -57.1 -59.3 64 -99 SPO 1997 10 16 13 14 62 5.1 -9 677.10 -59.9 -57.0 -59.2 64 -99 SPO 1997 10 16 13 15 61 5.1 -9 677.10 -59.9 -57.0 -59.2 64 -99 SPO 1997 10 16 13 16 60 5.0 -9 677.10 -59.9 -56.9 -59.2 64 -99 SPO 1997 10 16 13 17 61 5.1 -9 677.10 -59.9 -56.8 -59.2 63 -99 SPO 1997 10 16 13 18 59 5.0 -9 677.10 -59.9 -56.8 -59.2 63 -99 SPO 1997 10 16 13 19 58 5.0 -9 677.10 -59.9 -56.9 -59.2 63 -99 SPO 1997 10 16 13 20 58 4.9 -9 677.10 -59.8 -57.0 -59.2 62 -99 SPO 1997 10 16 13 21 58 5.3 -9 677.10 -59.8 -56.8 -59.2 62 -99 SPO 1997 10 16 13 22 58 5.4 -9 677.00 -59.8 -56.8 -59.2 63 -99 SPO 1997 10 16 13 23 57 5.4 -9 677.00 -59.8 -56.6 -59.1 63 -99 SPO 1997 10 16 13 24 57 5.5 -9 677.00 -59.7 -56.6 -59.1 62 -99 SPO 1997 10 16 13 25 58 5.5 -9 677.00 -59.7 -56.5 -59.1 63 -99 SPO 1997 10 16 13 26 59 5.6 -9 677.00 -59.7 -56.5 -59.1 64 -99 SPO 1997 10 16 13 27 58 5.6 -9 677.00 -59.6 -56.4 -59.0 63 -99 SPO 1997 10 16 13 28 57 5.4 -9 677.00 -59.6 -56.4 -59.0 64 -99 SPO 1997 10 16 13 29 56 5.5 -9 677.00 -59.6 -56.4 -59.0 64 -99 SPO 1997 10 16 13 30 56 5.5 -9 677.00 -59.5 -56.4 -58.9 63 -99 SPO 1997 10 16 13 31 55 5.4 -9 677.00 -59.5 -56.5 -58.9 63 -99 SPO 1997 10 16 13 32 54 5.4 -9 677.00 -59.5 -56.5 -58.9 63 -99 SPO 1997 10 16 13 33 54 5.5 -9 677.00 -59.4 -56.5 -58.8 62 -99 SPO 1997 10 16 13 34 53 5.6 -9 676.90 -59.4 -56.4 -58.8 63 -99 SPO 1997 10 16 13 35 52 5.6 -9 676.90 -59.4 -56.4 -58.8 64 -99 SPO 1997 10 16 13 36 51 5.6 -9 676.90 -59.4 -56.3 -58.7 65 -99 SPO 1997 10 16 13 37 51 5.7 -9 676.90 -59.3 -56.3 -58.7 65 -99 SPO 1997 10 16 13 38 52 5.7 -9 676.90 -59.3 -56.3 -58.7 65 -99 SPO 1997 10 16 13 39 52 5.8 -9 676.90 -59.2 -56.2 -58.6 65 -99 SPO 1997 10 16 13 40 53 5.8 -9 676.90 -59.2 -56.2 -58.6 65 -99 SPO 1997 10 16 13 41 54 5.8 -9 676.90 -59.2 -56.1 -58.6 67 -99 SPO 1997 10 16 13 42 54 5.8 -9 676.90 -59.1 -56.1 -58.5 66 -99 SPO 1997 10 16 13 43 55 5.7 -9 676.90 -59.1 -56.1 -58.5 67 -99 SPO 1997 10 16 13 44 56 5.6 -9 677.00 -59.1 -56.1 -58.4 67 -99 SPO 1997 10 16 13 45 57 5.6 -9 677.00 -59.1 -56.1 -58.4 68 -99 SPO 1997 10 16 13 46 57 5.4 -9 677.00 -59.0 -56.2 -58.4 68 -99 SPO 1997 10 16 13 47 60 5.5 -9 677.00 -59.0 -56.2 -58.4 68 -99 SPO 1997 10 16 13 48 61 5.5 -9 677.00 -59.0 -56.2 -58.4 69 -99 SPO 1997 10 16 13 49 62 5.3 -9 677.00 -59.0 -56.3 -58.4 69 -99 SPO 1997 10 16 13 50 62 5.2 -9 677.00 -59.1 -56.5 -58.4 70 -99 SPO 1997 10 16 13 51 63 5.1 -9 677.00 -59.1 -56.6 -58.4 69 -99 SPO 1997 10 16 13 52 63 5.2 -9 677.00 -59.1 -56.6 -58.4 68 -99 SPO 1997 10 16 13 53 64 5.4 -9 677.00 -59.2 -56.6 -58.4 67 -99 SPO 1997 10 16 13 54 63 5.4 -9 677.00 -59.2 -56.7 -58.5 67 -99 SPO 1997 10 16 13 55 64 5.5 -9 677.00 -59.2 -56.6 -58.5 66 -99 SPO 1997 10 16 13 56 64 5.2 -9 677.00 -59.2 -56.8 -58.5 66 -99 SPO 1997 10 16 13 57 65 5.2 -9 677.00 -59.3 -56.8 -58.5 67 -99 SPO 1997 10 16 13 58 64 5.0 -9 677.00 -59.3 -56.9 -58.5 67 -99 SPO 1997 10 16 13 59 63 5.0 -9 677.00 -59.3 -57.0 -58.5 67 -99 SPO 1997 10 16 14 00 63 5.0 -9 677.00 -59.3 -57.0 -58.5 67 0 SPO 1997 10 16 14 01 62 4.9 -9 677.00 -59.3 -56.9 -58.5 67 -99 SPO 1997 10 16 14 02 62 4.8 -9 677.00 -59.3 -56.8 -58.5 67 -99 SPO 1997 10 16 14 03 63 5.0 -9 676.90 -59.4 -56.9 -58.5 67 -99 SPO 1997 10 16 14 04 63 4.8 -9 676.90 -59.4 -57.0 -58.5 66 -99 SPO 1997 10 16 14 05 64 5.0 -9 676.90 -59.4 -57.0 -58.6 65 -99 SPO 1997 10 16 14 06 64 5.1 -9 676.90 -59.5 -56.9 -58.6 66 -99 SPO 1997 10 16 14 07 64 5.2 -9 676.90 -59.5 -56.8 -58.7 65 -99 SPO 1997 10 16 14 08 64 5.0 -9 676.90 -59.6 -56.8 -58.8 65 -99 SPO 1997 10 16 14 09 66 5.2 -9 676.90 -59.6 -56.8 -58.8 65 -99 SPO 1997 10 16 14 10 65 5.0 -9 676.90 -59.7 -56.9 -58.8 66 -99 SPO 1997 10 16 14 11 65 5.2 -9 676.90 -59.7 -56.9 -58.8 64 -99 SPO 1997 10 16 14 12 65 5.2 -9 676.90 -59.7 -57.0 -58.9 64 -99 SPO 1997 10 16 14 13 64 4.9 -9 676.90 -59.7 -56.9 -58.9 65 -99 SPO 1997 10 16 14 14 65 5.2 -9 676.90 -59.8 -57.0 -58.9 66 -99 SPO 1997 10 16 14 15 65 5.3 -9 676.90 -59.8 -56.8 -58.9 65 -99 SPO 1997 10 16 14 16 65 5.2 -9 676.90 -59.7 -56.9 -58.9 64 -99 SPO 1997 10 16 14 17 64 5.0 -9 676.90 -59.6 -57.0 -58.8 63 -99 SPO 1997 10 16 14 18 64 5.0 -9 676.90 -59.6 -57.0 -58.8 63 -99 SPO 1997 10 16 14 19 63 4.8 -9 676.90 -59.6 -56.9 -58.8 63 -99 SPO 1997 10 16 14 20 63 4.9 -9 676.90 -59.7 -57.0 -58.8 64 -99 SPO 1997 10 16 14 21 62 4.9 -9 676.90 -59.7 -57.0 -58.8 64 -99 SPO 1997 10 16 14 22 63 5.1 -9 676.90 -59.6 -56.9 -58.8 63 -99 SPO 1997 10 16 14 23 62 4.9 -9 676.90 -59.6 -56.8 -58.8 64 -99 SPO 1997 10 16 14 24 63 4.8 -9 676.90 -59.6 -56.8 -58.7 64 -99 SPO 1997 10 16 14 25 62 4.6 -9 676.90 -59.5 -56.9 -58.7 63 -99 SPO 1997 10 16 14 26 64 4.6 -9 676.90 -59.6 -57.0 -58.7 64 -99 SPO 1997 10 16 14 27 65 4.6 -9 676.90 -59.5 -57.0 -58.6 63 -99 SPO 1997 10 16 14 28 66 4.6 -9 676.90 -59.5 -57.0 -58.6 63 -99 SPO 1997 10 16 14 29 66 4.6 -9 676.90 -59.5 -57.1 -58.6 62 -99 SPO 1997 10 16 14 30 66 4.6 -9 676.90 -59.5 -57.1 -58.6 61 -99 SPO 1997 10 16 14 31 65 4.6 -9 676.90 -59.5 -57.1 -58.6 62 -99 SPO 1997 10 16 14 32 65 4.6 -9 676.90 -59.5 -57.0 -58.6 62 -99 SPO 1997 10 16 14 33 64 4.3 -9 676.90 -59.5 -57.1 -58.5 62 -99 SPO 1997 10 16 14 34 65 4.5 -9 676.90 -59.5 -57.1 -58.6 62 -99 SPO 1997 10 16 14 35 64 4.3 -9 676.90 -59.5 -57.2 -58.6 62 -99 SPO 1997 10 16 14 36 64 4.4 -9 676.90 -59.5 -57.2 -58.6 63 -99 SPO 1997 10 16 14 37 63 4.2 -9 676.90 -59.6 -57.2 -58.6 64 -99 SPO 1997 10 16 14 38 63 4.2 -9 676.90 -59.6 -57.2 -58.5 64 -99 SPO 1997 10 16 14 39 62 4.2 -9 676.90 -59.5 -57.2 -58.6 63 -99 SPO 1997 10 16 14 40 61 4.1 -9 676.90 -59.5 -57.2 -58.5 62 -99 SPO 1997 10 16 14 41 61 4.0 -9 676.90 -59.5 -57.2 -58.5 61 -99 SPO 1997 10 16 14 42 60 4.1 -9 676.90 -59.5 -57.3 -58.5 61 -99 SPO 1997 10 16 14 43 60 4.2 -9 676.90 -59.5 -57.2 -58.5 61 -99 SPO 1997 10 16 14 44 60 4.2 -9 676.90 -59.5 -57.2 -58.5 61 -99 SPO 1997 10 16 14 45 60 4.3 -9 676.90 -59.5 -57.2 -58.5 62 -99 SPO 1997 10 16 14 46 60 4.4 -9 676.90 -59.4 -57.2 -58.5 61 -99 SPO 1997 10 16 14 47 60 4.4 -9 676.90 -59.5 -57.2 -58.5 61 -99 SPO 1997 10 16 14 48 59 4.4 -9 676.90 -59.5 -57.2 -58.6 62 -99 SPO 1997 10 16 14 49 59 4.5 -9 676.90 -59.5 -57.3 -58.6 62 -99 SPO 1997 10 16 14 50 59 4.6 -9 676.80 -59.5 -57.3 -58.6 62 -99 SPO 1997 10 16 14 51 59 4.5 -9 676.80 -59.6 -57.3 -58.7 63 -99 SPO 1997 10 16 14 52 59 4.7 -9 676.80 -59.6 -57.2 -58.7 62 -99 SPO 1997 10 16 14 53 59 4.7 -9 676.80 -59.6 -57.2 -58.7 62 -99 SPO 1997 10 16 14 54 59 4.8 -9 676.80 -59.6 -57.2 -58.7 61 -99 SPO 1997 10 16 14 55 59 4.8 -9 676.80 -59.6 -57.2 -58.8 61 -99 SPO 1997 10 16 14 56 59 4.8 -9 676.80 -59.6 -57.1 -58.8 61 -99 SPO 1997 10 16 14 57 59 4.9 -9 676.80 -59.7 -57.2 -58.9 63 -99 SPO 1997 10 16 14 58 59 4.9 -9 676.80 -59.6 -57.1 -58.9 62 -99 SPO 1997 10 16 14 59 58 4.8 -9 676.80 -59.7 -57.0 -59.0 63 -99 SPO 1997 10 16 15 00 57 4.8 -9 676.80 -59.7 -57.0 -59.0 63 0 SPO 1997 10 16 15 01 56 4.9 -9 676.80 -59.7 -57.0 -59.0 63 -99 SPO 1997 10 16 15 02 56 5.0 -9 676.80 -59.6 -57.0 -59.0 62 -99 SPO 1997 10 16 15 03 55 5.0 -9 676.80 -59.5 -56.9 -58.9 61 -99 SPO 1997 10 16 15 04 54 5.1 -9 676.80 -59.4 -56.9 -58.8 60 -99 SPO 1997 10 16 15 05 53 4.9 -9 676.80 -59.4 -56.9 -58.8 60 -99 SPO 1997 10 16 15 06 53 4.8 -9 676.80 -59.4 -57.0 -58.8 60 -99 SPO 1997 10 16 15 07 53 4.9 -9 676.70 -59.4 -56.9 -58.8 61 -99 SPO 1997 10 16 15 08 52 4.7 -9 676.70 -59.4 -57.0 -58.8 61 -99 SPO 1997 10 16 15 09 52 4.5 -9 676.70 -59.3 -57.0 -58.7 61 -99 SPO 1997 10 16 15 10 52 4.8 -9 676.70 -59.3 -57.0 -58.7 61 -99 SPO 1997 10 16 15 11 52 4.8 -9 676.70 -59.4 -57.1 -58.8 62 -99 SPO 1997 10 16 15 12 51 4.8 -9 676.70 -59.4 -57.0 -58.8 62 -99 SPO 1997 10 16 15 13 52 4.9 -9 676.70 -59.4 -56.9 -58.7 62 -99 SPO 1997 10 16 15 14 52 4.8 -9 676.70 -59.3 -56.9 -58.7 62 -99 SPO 1997 10 16 15 15 52 4.6 -9 676.70 -59.3 -56.9 -58.7 61 -99 SPO 1997 10 16 15 16 52 4.7 -9 676.70 -59.2 -56.9 -58.6 61 -99 SPO 1997 10 16 15 17 53 4.8 -9 676.70 -59.2 -56.9 -58.6 61 -99 SPO 1997 10 16 15 18 52 4.8 -9 676.70 -59.2 -56.9 -58.5 61 -99 SPO 1997 10 16 15 19 52 4.8 -9 676.70 -59.2 -56.9 -58.5 61 -99 SPO 1997 10 16 15 20 51 4.9 -9 676.70 -59.2 -56.8 -58.5 61 -99 SPO 1997 10 16 15 21 51 5.0 -9 676.70 -59.1 -56.8 -58.5 61 -99 SPO 1997 10 16 15 22 51 5.0 -9 676.70 -59.1 -56.7 -58.5 61 -99 SPO 1997 10 16 15 23 51 5.1 -9 676.60 -59.1 -56.6 -58.4 62 -99 SPO 1997 10 16 15 24 52 5.0 -9 676.70 -59.1 -56.7 -58.4 62 -99 SPO 1997 10 16 15 25 52 5.0 -9 676.70 -59.0 -56.7 -58.4 61 -99 SPO 1997 10 16 15 26 53 4.9 -9 676.70 -59.0 -56.7 -58.3 61 -99 SPO 1997 10 16 15 27 53 5.0 -9 676.70 -59.0 -56.8 -58.3 61 -99 SPO 1997 10 16 15 28 54 4.8 -9 676.70 -59.0 -56.8 -58.3 61 -99 SPO 1997 10 16 15 29 54 4.7 -9 676.70 -59.0 -56.8 -58.2 61 -99 SPO 1997 10 16 15 30 55 4.8 -9 676.70 -58.9 -56.8 -58.2 60 -99 SPO 1997 10 16 15 31 54 4.8 -9 676.70 -58.9 -56.7 -58.2 60 -99 SPO 1997 10 16 15 32 54 4.7 -9 676.70 -58.9 -56.8 -58.1 60 -99 SPO 1997 10 16 15 33 54 4.7 -9 676.70 -58.9 -56.8 -58.1 61 -99 SPO 1997 10 16 15 34 53 4.7 -9 676.70 -58.8 -56.7 -58.0 61 -99 SPO 1997 10 16 15 35 54 4.8 -9 676.70 -58.8 -56.7 -58.0 61 -99 SPO 1997 10 16 15 36 54 5.0 -9 676.70 -58.8 -56.8 -58.0 61 -99 SPO 1997 10 16 15 37 53 5.1 -9 676.70 -58.8 -56.8 -58.0 62 -99 SPO 1997 10 16 15 38 53 5.1 -9 676.70 -58.7 -56.8 -58.0 61 -99 SPO 1997 10 16 15 39 51 5.2 -9 676.70 -58.7 -56.8 -58.0 61 -99 SPO 1997 10 16 15 40 51 5.2 -9 676.70 -58.7 -56.6 -57.9 61 -99 SPO 1997 10 16 15 41 51 5.3 -9 676.70 -58.7 -56.6 -57.9 61 -99 SPO 1997 10 16 15 42 50 5.4 -9 676.70 -58.7 -56.6 -57.9 61 -99 SPO 1997 10 16 15 43 50 5.5 -9 676.70 -58.6 -56.5 -57.9 61 -99 SPO 1997 10 16 15 44 50 5.5 -9 676.70 -58.6 -56.4 -57.9 61 -99 SPO 1997 10 16 15 45 50 5.4 -9 676.70 -58.6 -56.5 -57.9 62 -99 SPO 1997 10 16 15 46 50 5.5 -9 676.60 -58.6 -56.6 -57.9 62 -99 SPO 1997 10 16 15 47 49 5.6 -9 676.60 -58.6 -56.6 -57.9 62 -99 SPO 1997 10 16 15 48 51 5.5 -9 676.60 -58.5 -56.6 -57.8 62 -99 SPO 1997 10 16 15 49 51 5.7 -9 676.60 -58.5 -56.5 -57.9 62 -99 SPO 1997 10 16 15 50 50 5.8 -9 676.60 -58.4 -56.4 -57.8 61 -99 SPO 1997 10 16 15 51 51 5.7 -9 676.60 -58.4 -56.3 -57.8 61 -99 SPO 1997 10 16 15 52 51 5.7 -9 676.60 -58.5 -56.4 -57.8 62 -99 SPO 1997 10 16 15 53 51 5.5 -9 676.60 -58.4 -56.4 -57.8 61 -99 SPO 1997 10 16 15 54 50 5.6 -9 676.60 -58.4 -56.4 -57.8 61 -99 SPO 1997 10 16 15 55 50 5.7 -9 676.60 -58.4 -56.3 -57.7 62 -99 SPO 1997 10 16 15 56 50 5.7 -9 676.60 -58.4 -56.3 -57.7 62 -99 SPO 1997 10 16 15 57 50 5.8 -9 676.60 -58.4 -56.2 -57.7 62 -99 SPO 1997 10 16 15 58 50 5.8 -9 676.60 -58.3 -56.1 -57.7 -99 -99 SPO 1997 10 16 15 59 49 5.6 -9 676.60 -58.3 -56.0 -57.7 -99 -99 SPO 1997 10 16 16 00 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 0 SPO 1997 10 16 16 01 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 16 16 02 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 16 16 03 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 16 16 04 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 16 16 05 47 5.8 -9 676.60 -58.2 -56.3 -57.6 -99 -99 SPO 1997 10 16 16 06 47 5.7 -9 676.60 -58.2 -56.3 -57.6 -99 -99 SPO 1997 10 16 16 07 46 5.6 -9 676.60 -58.2 -56.4 -57.6 62 -99 SPO 1997 10 16 16 08 46 5.5 -9 676.60 -58.2 -56.5 -57.6 62 -99 SPO 1997 10 16 16 09 46 5.4 -9 676.60 -58.3 -56.6 -57.6 63 -99 SPO 1997 10 16 16 10 45 5.6 -9 676.60 -58.3 -56.6 -57.6 63 -99 SPO 1997 10 16 16 11 45 5.7 -9 676.60 -58.1 -56.6 -57.5 62 -99 SPO 1997 10 16 16 12 44 5.8 -9 676.60 -58.0 -56.6 -57.5 62 -99 SPO 1997 10 16 16 13 45 6.0 -9 676.60 -58.0 -56.5 -57.4 62 -99 SPO 1997 10 16 16 14 45 6.1 -9 676.60 -58.0 -56.4 -57.4 63 -99 SPO 1997 10 16 16 15 45 6.2 -9 676.60 -57.9 -56.3 -57.4 64 -99 SPO 1997 10 16 16 16 45 6.1 -9 676.60 -57.9 -56.3 -57.4 64 -99 SPO 1997 10 16 16 17 45 5.9 -9 676.60 -57.9 -56.2 -57.4 64 -99 SPO 1997 10 16 16 18 47 5.7 -9 676.60 -57.9 -56.2 -57.3 64 -99 SPO 1997 10 16 16 19 48 5.7 -9 676.60 -58.0 -56.1 -57.4 63 -99 SPO 1997 10 16 16 20 48 5.7 -9 676.60 -58.0 -56.2 -57.4 63 -99 SPO 1997 10 16 16 21 48 5.5 -9 676.60 -58.0 -56.2 -57.4 63 -99 SPO 1997 10 16 16 22 47 5.5 -9 676.60 -58.0 -56.4 -57.4 63 -99 SPO 1997 10 16 16 23 47 5.4 -9 676.60 -58.0 -56.4 -57.4 63 -99 SPO 1997 10 16 16 24 45 5.6 -9 676.60 -58.1 -56.4 -57.5 63 -99 SPO 1997 10 16 16 25 44 5.5 -9 676.60 -58.0 -56.4 -57.5 62 -99 SPO 1997 10 16 16 26 45 5.3 -9 676.60 -58.0 -56.5 -57.5 63 -99 SPO 1997 10 16 16 27 45 5.4 -9 676.60 -58.1 -56.5 -57.5 63 -99 SPO 1997 10 16 16 28 45 5.5 -9 676.60 -58.1 -56.5 -57.6 63 -99 SPO 1997 10 16 16 29 46 5.3 -9 676.60 -58.1 -56.6 -57.5 62 -99 SPO 1997 10 16 16 30 47 5.3 -9 676.60 -58.1 -56.4 -57.5 62 -99 SPO 1997 10 16 16 31 47 5.3 -9 676.60 -58.1 -56.4 -57.5 62 -99 SPO 1997 10 16 16 32 47 5.3 -9 676.60 -58.1 -56.4 -57.5 62 -99 SPO 1997 10 16 16 33 46 5.4 -9 676.60 -58.2 -56.4 -57.5 63 -99 SPO 1997 10 16 16 34 46 5.5 -9 676.60 -58.2 -56.4 -57.6 64 -99 SPO 1997 10 16 16 35 46 5.3 -9 676.60 -58.1 -56.4 -57.5 63 -99 SPO 1997 10 16 16 36 46 5.3 -9 676.60 -58.1 -56.4 -57.6 63 -99 SPO 1997 10 16 16 37 47 5.2 -9 676.60 -58.2 -56.4 -57.6 64 -99 SPO 1997 10 16 16 38 47 5.3 -9 676.60 -58.2 -56.3 -57.6 64 -99 SPO 1997 10 16 16 39 47 5.2 -9 676.60 -58.2 -56.3 -57.6 63 -99 SPO 1997 10 16 16 40 46 5.3 -9 676.60 -58.2 -56.3 -57.6 62 -99 SPO 1997 10 16 16 41 47 5.2 -9 676.60 -58.2 -56.3 -57.6 62 -99 SPO 1997 10 16 16 42 47 5.2 -9 676.60 -58.2 -56.4 -57.6 62 -99 SPO 1997 10 16 16 43 48 5.1 -9 676.60 -58.1 -56.4 -57.6 62 -99 SPO 1997 10 16 16 44 49 5.2 -9 676.60 -58.2 -56.5 -57.6 62 -99 SPO 1997 10 16 16 45 49 5.1 -9 676.60 -58.2 -56.5 -57.6 63 -99 SPO 1997 10 16 16 46 49 5.2 -9 676.60 -58.3 -56.6 -57.6 64 -99 SPO 1997 10 16 16 47 50 5.2 -9 676.60 -58.3 -56.5 -57.7 64 -99 SPO 1997 10 16 16 48 51 5.2 -9 676.60 -58.3 -56.6 -57.7 64 -99 SPO 1997 10 16 16 49 51 5.2 -9 676.60 -58.4 -56.6 -57.8 65 -99 SPO 1997 10 16 16 50 52 5.1 -9 676.60 -58.4 -56.5 -57.8 64 -99 SPO 1997 10 16 16 51 51 5.2 -9 676.60 -58.5 -56.6 -57.8 64 -99 SPO 1997 10 16 16 52 52 5.0 -9 676.60 -58.5 -56.6 -57.8 63 -99 SPO 1997 10 16 16 53 52 4.9 -9 676.60 -58.5 -56.6 -57.8 62 -99 SPO 1997 10 16 16 54 53 4.9 -9 676.60 -58.5 -56.7 -57.8 62 -99 SPO 1997 10 16 16 55 54 4.9 -9 676.60 -58.6 -56.7 -57.9 62 -99 SPO 1997 10 16 16 56 54 4.8 -9 676.60 -58.6 -56.7 -57.9 62 -99 SPO 1997 10 16 16 57 55 4.7 -9 676.60 -58.6 -56.7 -57.9 62 -99 SPO 1997 10 16 16 58 56 4.7 -9 676.60 -58.7 -56.8 -58.0 63 -99 SPO 1997 10 16 16 59 57 4.7 -9 676.60 -58.7 -56.8 -58.0 63 -99 SPO 1997 10 16 17 00 57 4.6 -9 676.50 -58.8 -56.8 -58.0 64 0 SPO 1997 10 16 17 01 57 4.7 -9 676.60 -58.8 -56.9 -58.0 64 -99 SPO 1997 10 16 17 02 58 4.6 -9 676.50 -58.8 -56.8 -58.0 64 -99 SPO 1997 10 16 17 03 57 4.7 -9 676.50 -58.9 -56.8 -58.0 64 -99 SPO 1997 10 16 17 04 56 4.7 -9 676.50 -58.9 -56.8 -58.1 63 -99 SPO 1997 10 16 17 05 56 4.8 -9 676.50 -58.9 -56.8 -58.1 63 -99 SPO 1997 10 16 17 06 56 4.8 -9 676.50 -58.9 -56.7 -58.1 62 -99 SPO 1997 10 16 17 07 56 4.8 -9 676.50 -58.9 -56.7 -58.2 62 -99 SPO 1997 10 16 17 08 57 4.8 -9 676.50 -58.9 -56.6 -58.2 62 -99 SPO 1997 10 16 17 09 57 4.9 -9 676.50 -58.9 -56.6 -58.2 62 -99 SPO 1997 10 16 17 10 58 4.9 -9 676.50 -59.0 -56.6 -58.2 63 -99 SPO 1997 10 16 17 11 59 4.9 -9 676.60 -59.0 -56.6 -58.2 63 -99 SPO 1997 10 16 17 12 60 5.1 -9 676.60 -59.0 -56.4 -58.2 63 -99 SPO 1997 10 16 17 13 60 5.0 -9 676.60 -59.0 -56.5 -58.2 63 -99 SPO 1997 10 16 17 14 60 4.9 -9 676.60 -59.0 -56.7 -58.3 62 -99 SPO 1997 10 16 17 15 60 4.8 -9 676.60 -59.0 -56.8 -58.3 61 -99 SPO 1997 10 16 17 16 59 4.9 -9 676.50 -59.1 -56.7 -58.4 61 -99 SPO 1997 10 16 17 17 60 4.9 -9 676.60 -59.1 -56.8 -58.4 61 -99 SPO 1997 10 16 17 18 60 4.8 -9 676.60 -59.1 -56.8 -58.4 61 -99 SPO 1997 10 16 17 19 60 4.8 -9 676.60 -59.2 -56.8 -58.4 62 -99 SPO 1997 10 16 17 20 60 4.8 -9 676.60 -59.2 -56.9 -58.5 62 -99 SPO 1997 10 16 17 21 59 4.9 -9 676.50 -59.2 -56.9 -58.5 62 -99 SPO 1997 10 16 17 22 60 4.8 -9 676.50 -59.2 -57.0 -58.5 62 -99 SPO 1997 10 16 17 23 60 4.8 -9 676.60 -59.2 -56.9 -58.5 62 -99 SPO 1997 10 16 17 24 60 4.9 -9 676.60 -59.2 -56.8 -58.5 62 -99 SPO 1997 10 16 17 25 60 4.8 -9 676.60 -59.2 -56.8 -58.5 61 -99 SPO 1997 10 16 17 26 59 4.9 -9 676.60 -59.2 -56.6 -58.5 61 -99 SPO 1997 10 16 17 27 59 4.8 -9 676.60 -59.2 -56.6 -58.5 61 -99 SPO 1997 10 16 17 28 57 4.8 -9 676.60 -59.3 -56.6 -58.6 61 -99 SPO 1997 10 16 17 29 58 4.8 -9 676.60 -59.2 -56.7 -58.5 61 -99 SPO 1997 10 16 17 30 58 4.8 -9 676.60 -59.2 -56.7 -58.5 61 -99 SPO 1997 10 16 17 31 57 4.7 -9 676.60 -59.1 -56.7 -58.5 61 -99 SPO 1997 10 16 17 32 57 4.8 -9 676.60 -59.1 -56.8 -58.4 61 -99 SPO 1997 10 16 17 33 57 4.6 -9 676.60 -59.2 -56.8 -58.4 61 -99 SPO 1997 10 16 17 34 58 4.5 -9 676.60 -59.1 -56.8 -58.4 61 -99 SPO 1997 10 16 17 35 59 4.5 -9 676.60 -59.1 -56.9 -58.4 61 -99 SPO 1997 10 16 17 36 60 4.5 -9 676.60 -59.1 -56.9 -58.4 61 -99 SPO 1997 10 16 17 37 61 4.3 -9 676.60 -59.1 -56.9 -58.3 61 -99 SPO 1997 10 16 17 38 61 4.3 -9 676.60 -59.1 -57.0 -58.3 62 -99 SPO 1997 10 16 17 39 60 4.2 -9 676.60 -59.1 -57.0 -58.3 62 -99 SPO 1997 10 16 17 40 60 4.3 -9 676.60 -59.1 -56.9 -58.3 62 -99 SPO 1997 10 16 17 41 59 4.3 -9 676.50 -59.1 -56.9 -58.2 62 -99 SPO 1997 10 16 17 42 59 4.4 -9 676.50 -59.1 -56.8 -58.2 62 -99 SPO 1997 10 16 17 43 58 4.4 -9 676.50 -59.1 -56.8 -58.2 62 -99 SPO 1997 10 16 17 44 57 4.4 -9 676.50 -59.1 -56.8 -58.2 63 -99 SPO 1997 10 16 17 45 56 4.6 -9 676.50 -59.0 -56.8 -58.2 62 -99 SPO 1997 10 16 17 46 56 4.5 -9 676.50 -59.0 -56.6 -58.2 63 -99 SPO 1997 10 16 17 47 56 4.4 -9 676.50 -59.1 -56.8 -58.2 65 -99 SPO 1997 10 16 17 48 56 4.4 -9 676.50 -59.1 -56.8 -58.2 65 -99 SPO 1997 10 16 17 49 56 4.5 -9 676.50 -59.1 -56.8 -58.2 65 -99 SPO 1997 10 16 17 50 57 4.6 -9 676.50 -59.1 -56.7 -58.2 64 -99 SPO 1997 10 16 17 51 57 4.5 -9 676.50 -59.1 -56.6 -58.2 63 -99 SPO 1997 10 16 17 52 58 4.8 -9 676.50 -59.0 -56.6 -58.2 62 -99 SPO 1997 10 16 17 53 58 4.8 -9 676.50 -58.9 -56.4 -58.1 61 -99 SPO 1997 10 16 17 54 57 5.1 -9 676.50 -58.9 -56.3 -58.1 62 -99 SPO 1997 10 16 17 55 57 4.8 -9 676.50 -59.0 -56.3 -58.2 63 -99 SPO 1997 10 16 17 56 57 5.1 -9 676.50 -59.0 -56.2 -58.2 63 -99 SPO 1997 10 16 17 57 57 5.3 -9 676.50 -59.0 -55.8 -58.2 63 -99 SPO 1997 10 16 17 58 55 4.9 -9 676.50 -58.9 -56.0 -58.1 62 -99 SPO 1997 10 16 17 59 57 5.1 -9 676.50 -59.0 -56.1 -58.1 63 -99 SPO 1997 10 16 18 00 56 5.2 -9 676.50 -58.9 -56.3 -58.1 63 0 SPO 1997 10 16 18 01 55 5.0 -9 676.50 -58.8 -56.2 -58.1 62 -99 SPO 1997 10 16 18 02 55 5.1 -9 676.40 -58.8 -56.3 -58.0 62 -99 SPO 1997 10 16 18 03 56 5.3 -9 676.50 -58.8 -56.2 -58.0 62 -99 SPO 1997 10 16 18 04 56 5.2 -9 676.50 -58.7 -56.2 -57.9 61 -99 SPO 1997 10 16 18 05 55 5.0 -9 676.50 -58.7 -56.3 -57.9 62 -99 SPO 1997 10 16 18 06 54 5.2 -9 676.40 -58.6 -56.3 -57.9 62 -99 SPO 1997 10 16 18 07 54 5.1 -9 676.40 -58.6 -56.2 -57.8 63 -99 SPO 1997 10 16 18 08 55 5.0 -9 676.40 -58.5 -56.2 -57.8 62 -99 SPO 1997 10 16 18 09 56 5.1 -9 676.50 -58.6 -56.2 -57.8 63 -99 SPO 1997 10 16 18 10 55 5.0 -9 676.40 -58.6 -56.3 -57.8 63 -99 SPO 1997 10 16 18 11 54 5.0 -9 676.40 -58.6 -56.4 -57.8 64 -99 SPO 1997 10 16 18 12 55 5.1 -9 676.40 -58.5 -56.4 -57.8 63 -99 SPO 1997 10 16 18 13 55 5.1 -9 676.40 -58.5 -56.4 -57.7 63 -99 SPO 1997 10 16 18 14 56 5.0 -9 676.40 -58.5 -56.4 -57.7 63 -99 SPO 1997 10 16 18 15 57 4.9 -9 676.40 -58.6 -56.6 -57.8 63 -99 SPO 1997 10 16 18 16 58 4.8 -9 676.40 -58.7 -56.6 -57.8 64 -99 SPO 1997 10 16 18 17 58 4.8 -9 676.40 -58.7 -56.8 -57.8 64 -99 SPO 1997 10 16 18 18 58 4.8 -9 676.40 -58.7 -56.8 -57.8 64 -99 SPO 1997 10 16 18 19 58 4.7 -9 676.40 -58.7 -57.0 -57.8 64 -99 SPO 1997 10 16 18 20 57 4.6 -9 676.40 -58.7 -57.1 -57.8 64 -99 SPO 1997 10 16 18 21 56 4.5 -9 676.30 -58.8 -57.1 -57.9 65 -99 SPO 1997 10 16 18 22 56 4.5 -9 676.40 -58.8 -57.1 -57.9 65 -99 SPO 1997 10 16 18 23 56 4.3 -9 676.30 -58.8 -57.1 -57.8 65 -99 SPO 1997 10 16 18 24 55 4.2 -9 676.40 -58.8 -57.0 -57.8 65 -99 SPO 1997 10 16 18 25 54 4.4 -9 676.40 -58.8 -57.0 -57.8 65 -99 SPO 1997 10 16 18 26 53 4.5 -9 676.40 -58.8 -56.9 -57.8 65 -99 SPO 1997 10 16 18 27 53 4.5 -9 676.40 -58.7 -56.9 -57.8 64 -99 SPO 1997 10 16 18 28 52 4.6 -9 676.40 -58.7 -56.7 -57.7 64 -99 SPO 1997 10 16 18 29 52 4.5 -9 676.30 -58.6 -56.7 -57.7 64 -99 SPO 1997 10 16 18 30 51 4.5 -9 676.30 -58.5 -56.6 -57.6 64 -99 SPO 1997 10 16 18 31 51 4.4 -9 676.30 -58.5 -56.6 -57.6 65 -99 SPO 1997 10 16 18 32 51 4.4 -9 676.30 -58.5 -56.7 -57.5 64 -99 SPO 1997 10 16 18 33 50 4.5 -9 676.30 -58.5 -56.7 -57.5 65 -99 SPO 1997 10 16 18 34 50 4.5 -9 676.30 -58.4 -56.6 -57.5 64 -99 SPO 1997 10 16 18 35 50 4.6 -9 676.30 -58.4 -56.6 -57.5 65 -99 SPO 1997 10 16 18 36 49 4.8 -9 676.30 -58.3 -56.4 -57.4 64 -99 SPO 1997 10 16 18 37 49 4.9 -9 676.30 -58.3 -56.2 -57.4 64 -99 SPO 1997 10 16 18 38 50 5.0 -9 676.30 -58.2 -56.1 -57.4 63 -99 SPO 1997 10 16 18 39 50 4.9 -9 676.30 -58.2 -56.2 -57.3 64 -99 SPO 1997 10 16 18 40 50 4.7 -9 676.30 -58.1 -56.2 -57.3 64 -99 SPO 1997 10 16 18 41 49 4.6 -9 676.40 -58.1 -56.2 -57.2 66 -99 SPO 1997 10 16 18 42 49 4.6 -9 676.40 -58.1 -56.3 -57.2 66 -99 SPO 1997 10 16 18 43 49 4.6 -9 676.40 -58.1 -56.2 -57.2 67 -99 SPO 1997 10 16 18 44 49 4.7 -9 676.30 -58.1 -56.2 -57.2 68 -99 SPO 1997 10 16 18 45 50 4.8 -9 676.30 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 16 18 46 49 4.9 -9 676.30 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 16 18 47 48 4.7 -9 676.30 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 16 18 48 48 4.9 -9 676.40 -57.9 -56.2 -57.1 67 -99 SPO 1997 10 16 18 49 47 4.7 -9 676.40 -57.9 -56.2 -57.0 67 -99 SPO 1997 10 16 18 50 48 4.8 -9 676.40 -57.9 -56.3 -57.0 67 -99 SPO 1997 10 16 18 51 47 5.0 -9 676.40 -57.8 -56.3 -57.0 66 -99 SPO 1997 10 16 18 52 48 5.0 -9 676.40 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 16 18 53 47 4.9 -9 676.40 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 16 18 54 48 4.9 -9 676.40 -57.8 -56.2 -57.0 68 -99 SPO 1997 10 16 18 55 47 5.0 -9 676.40 -57.8 -56.2 -57.0 68 -99 SPO 1997 10 16 18 56 47 5.0 -9 676.40 -57.9 -56.2 -57.0 69 -99 SPO 1997 10 16 18 57 49 5.0 -9 676.40 -57.9 -56.1 -57.0 69 -99 SPO 1997 10 16 18 58 49 5.1 -9 676.40 -57.8 -56.1 -57.1 67 -99 SPO 1997 10 16 18 59 50 5.1 -9 676.40 -57.8 -56.0 -57.1 68 -99 SPO 1997 10 16 19 00 50 5.0 -9 676.40 -57.9 -56.0 -57.1 68 0 SPO 1997 10 16 19 01 50 5.0 -9 676.40 -57.9 -56.0 -57.1 67 -99 SPO 1997 10 16 19 02 51 4.9 -9 676.40 -57.9 -56.1 -57.1 67 -99 SPO 1997 10 16 19 03 52 5.0 -9 676.40 -57.8 -56.1 -57.1 66 -99 SPO 1997 10 16 19 04 51 4.8 -9 676.40 -57.8 -56.1 -57.0 66 -99 SPO 1997 10 16 19 05 50 4.7 -9 676.40 -57.8 -56.1 -57.0 67 -99 SPO 1997 10 16 19 06 49 4.8 -9 676.40 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 16 19 07 50 5.0 -9 676.40 -57.7 -56.2 -57.0 67 -99 SPO 1997 10 16 19 08 48 5.0 -9 676.40 -57.6 -56.2 -56.9 67 -99 SPO 1997 10 16 19 09 49 4.9 -9 676.40 -57.6 -56.2 -56.9 67 -99 SPO 1997 10 16 19 10 49 4.9 -9 676.40 -57.6 -56.2 -56.9 67 -99 SPO 1997 10 16 19 11 50 4.9 -9 676.40 -57.6 -56.1 -56.9 67 -99 SPO 1997 10 16 19 12 50 4.9 -9 676.40 -57.6 -56.1 -56.9 67 -99 SPO 1997 10 16 19 13 49 4.8 -9 676.40 -57.6 -56.1 -56.9 66 -99 SPO 1997 10 16 19 14 49 4.8 -9 676.40 -57.6 -56.0 -56.9 66 -99 SPO 1997 10 16 19 15 51 4.6 -9 676.40 -57.6 -56.1 -56.9 66 -99 SPO 1997 10 16 19 16 51 4.5 -9 676.40 -57.6 -56.2 -56.9 66 -99 SPO 1997 10 16 19 17 50 4.2 -9 676.40 -57.7 -56.5 -56.9 67 -99 SPO 1997 10 16 19 18 52 4.3 -9 676.40 -57.6 -56.5 -56.9 66 -99 SPO 1997 10 16 19 19 52 4.2 -9 676.40 -57.7 -56.6 -56.9 67 -99 SPO 1997 10 16 19 20 53 4.1 -9 676.40 -57.8 -56.6 -57.0 67 -99 SPO 1997 10 16 19 21 52 4.0 -9 676.40 -57.9 -56.6 -57.0 68 -99 SPO 1997 10 16 19 22 51 4.0 -9 676.40 -57.8 -56.7 -57.0 67 -99 SPO 1997 10 16 19 23 51 4.0 -9 676.40 -57.8 -56.6 -57.0 67 -99 SPO 1997 10 16 19 24 51 4.0 -9 676.40 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 16 19 25 53 4.0 -9 676.40 -57.8 -56.7 -57.1 66 -99 SPO 1997 10 16 19 26 53 3.8 -9 676.40 -57.8 -56.7 -57.1 66 -99 SPO 1997 10 16 19 27 55 3.8 -9 676.40 -57.8 -56.7 -57.0 65 -99 SPO 1997 10 16 19 28 56 3.7 -9 676.40 -57.8 -56.7 -57.0 66 -99 SPO 1997 10 16 19 29 58 3.6 -9 676.40 -57.8 -56.7 -57.0 66 -99 SPO 1997 10 16 19 30 60 3.5 -9 676.40 -57.8 -56.8 -57.0 67 -99 SPO 1997 10 16 19 31 59 3.5 -9 676.40 -57.8 -56.7 -56.9 67 -99 SPO 1997 10 16 19 32 57 3.7 -9 676.40 -57.8 -56.7 -56.9 67 -99 SPO 1997 10 16 19 33 58 3.6 -9 676.40 -57.8 -56.6 -57.0 67 -99 SPO 1997 10 16 19 34 56 3.8 -9 676.40 -57.8 -56.7 -57.0 67 -99 SPO 1997 10 16 19 35 55 4.0 -9 676.40 -57.8 -56.5 -57.0 67 -99 SPO 1997 10 16 19 36 55 4.0 -9 676.40 -57.8 -56.4 -57.0 66 -99 SPO 1997 10 16 19 37 54 3.9 -9 676.40 -57.7 -56.3 -57.0 65 -99 SPO 1997 10 16 19 38 55 3.8 -9 676.40 -57.7 -56.3 -57.0 64 -99 SPO 1997 10 16 19 39 56 3.8 -9 676.40 -57.7 -56.3 -57.0 64 -99 SPO 1997 10 16 19 40 56 3.9 -9 676.40 -57.7 -56.2 -57.0 65 -99 SPO 1997 10 16 19 41 55 3.9 -9 676.40 -57.7 -56.2 -56.9 65 -99 SPO 1997 10 16 19 42 55 4.0 -9 676.40 -57.6 -56.3 -56.9 65 -99 SPO 1997 10 16 19 43 56 3.9 -9 676.40 -57.6 -56.3 -56.9 66 -99 SPO 1997 10 16 19 44 56 3.9 -9 676.40 -57.6 -56.4 -56.8 67 -99 SPO 1997 10 16 19 45 56 3.8 -9 676.40 -57.6 -56.4 -56.8 67 -99 SPO 1997 10 16 19 46 56 3.8 -9 676.40 -57.5 -56.5 -56.8 66 -99 SPO 1997 10 16 19 47 55 4.0 -9 676.30 -57.5 -56.4 -56.7 66 -99 SPO 1997 10 16 19 48 56 4.0 -9 676.30 -57.5 -56.4 -56.8 66 -99 SPO 1997 10 16 19 49 55 4.0 -9 676.30 -57.5 -56.4 -56.7 66 -99 SPO 1997 10 16 19 50 55 4.1 -9 676.30 -57.4 -56.3 -56.7 65 -99 SPO 1997 10 16 19 51 55 4.0 -9 676.30 -57.4 -56.4 -56.7 65 -99 SPO 1997 10 16 19 52 56 3.9 -9 676.30 -57.3 -56.4 -56.7 65 -99 SPO 1997 10 16 19 53 56 3.9 -9 676.30 -57.4 -56.4 -56.7 66 -99 SPO 1997 10 16 19 54 57 3.8 -9 676.40 -57.4 -56.4 -56.6 67 -99 SPO 1997 10 16 19 55 58 3.8 -9 676.40 -57.3 -56.4 -56.6 66 -99 SPO 1997 10 16 19 56 57 3.8 -9 676.40 -57.3 -56.5 -56.6 66 -99 SPO 1997 10 16 19 57 57 3.9 -9 676.40 -57.3 -56.4 -56.6 65 -99 SPO 1997 10 16 19 58 58 3.9 -9 676.40 -57.3 -56.4 -56.6 66 -99 SPO 1997 10 16 19 59 59 4.0 -9 676.40 -57.3 -56.4 -56.6 66 -99 SPO 1997 10 16 20 00 58 4.0 -9 676.40 -57.2 -56.4 -56.6 65 0 SPO 1997 10 16 20 01 58 4.1 -9 676.40 -57.2 -56.4 -56.6 65 -99 SPO 1997 10 16 20 02 58 4.0 -9 676.40 -57.2 -56.4 -56.5 65 -99 SPO 1997 10 16 20 03 57 3.9 -9 676.40 -57.2 -56.4 -56.5 65 -99 SPO 1997 10 16 20 04 57 4.1 -9 676.40 -57.2 -56.4 -56.5 66 -99 SPO 1997 10 16 20 05 58 4.0 -9 676.40 -57.2 -56.3 -56.4 67 -99 SPO 1997 10 16 20 06 57 4.1 -9 676.40 -57.1 -56.3 -56.4 67 -99 SPO 1997 10 16 20 07 57 4.1 -9 676.40 -57.1 -56.2 -56.4 67 -99 SPO 1997 10 16 20 08 57 4.0 -9 676.30 -57.1 -56.2 -56.4 68 -99 SPO 1997 10 16 20 09 58 3.9 -9 676.30 -57.1 -56.2 -56.4 68 -99 SPO 1997 10 16 20 10 58 4.0 -9 676.30 -57.1 -56.2 -56.4 68 -99 SPO 1997 10 16 20 11 59 4.1 -9 676.30 -57.1 -56.1 -56.4 68 -99 SPO 1997 10 16 20 12 57 4.0 -9 676.30 -57.1 -56.1 -56.4 67 -99 SPO 1997 10 16 20 13 56 4.0 -9 676.30 -57.1 -56.1 -56.4 66 -99 SPO 1997 10 16 20 14 56 4.0 -9 676.30 -57.1 -56.0 -56.3 66 -99 SPO 1997 10 16 20 15 54 4.2 -9 676.30 -57.0 -55.9 -56.3 65 -99 SPO 1997 10 16 20 16 54 4.1 -9 676.30 -57.0 -55.8 -56.3 66 -99 SPO 1997 10 16 20 17 54 4.0 -9 676.30 -56.9 -55.8 -56.2 66 -99 SPO 1997 10 16 20 18 55 3.9 -9 676.30 -56.9 -55.8 -56.2 67 -99 SPO 1997 10 16 20 19 56 3.8 -9 676.20 -56.9 -55.9 -56.1 67 -99 SPO 1997 10 16 20 20 57 4.0 -9 676.20 -56.9 -55.8 -56.1 68 -99 SPO 1997 10 16 20 21 57 4.0 -9 676.20 -56.8 -55.8 -56.1 67 -99 SPO 1997 10 16 20 22 56 4.0 -9 676.20 -56.8 -55.8 -56.1 68 -99 SPO 1997 10 16 20 23 56 3.9 -9 676.20 -56.8 -55.8 -56.1 68 -99 SPO 1997 10 16 20 24 56 3.9 -9 676.20 -56.8 -55.8 -56.1 67 -99 SPO 1997 10 16 20 25 55 4.1 -9 676.20 -56.8 -55.6 -56.1 67 -99 SPO 1997 10 16 20 26 55 4.2 -9 676.20 -56.7 -55.5 -56.0 66 -99 SPO 1997 10 16 20 27 54 4.2 -9 676.20 -56.6 -55.4 -56.0 65 -99 SPO 1997 10 16 20 28 54 4.2 -9 676.20 -56.6 -55.4 -56.0 66 -99 SPO 1997 10 16 20 29 56 4.1 -9 676.20 -56.5 -55.5 -55.9 66 -99 SPO 1997 10 16 20 30 56 4.2 -9 676.20 -56.5 -55.5 -55.9 67 -99 SPO 1997 10 16 20 31 57 4.2 -9 676.20 -56.5 -55.5 -55.9 67 -99 SPO 1997 10 16 20 32 57 4.2 -9 676.20 -56.6 -55.5 -55.9 68 -99 SPO 1997 10 16 20 33 58 4.2 -9 676.20 -56.6 -55.6 -55.9 68 -99 SPO 1997 10 16 20 34 60 4.0 -9 676.20 -56.6 -55.6 -56.0 69 -99 SPO 1997 10 16 20 35 61 3.9 -9 676.20 -56.6 -55.7 -56.0 68 -99 SPO 1997 10 16 20 36 61 3.9 -9 676.20 -56.6 -55.7 -56.0 68 -99 SPO 1997 10 16 20 37 61 3.8 -9 676.20 -56.6 -55.7 -56.0 68 -99 SPO 1997 10 16 20 38 62 3.9 -9 676.20 -56.7 -55.7 -56.0 68 -99 SPO 1997 10 16 20 39 62 4.0 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 40 62 4.0 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 41 62 4.0 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 42 62 4.2 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 43 61 4.0 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 44 62 4.1 -9 676.20 -56.7 -55.5 -56.0 68 -99 SPO 1997 10 16 20 45 64 4.0 -9 676.20 -56.7 -55.6 -56.0 68 -99 SPO 1997 10 16 20 46 65 4.0 -9 676.20 -56.8 -55.7 -56.0 69 -99 SPO 1997 10 16 20 47 65 4.0 -9 676.20 -56.8 -55.7 -56.1 68 -99 SPO 1997 10 16 20 48 66 4.1 -9 676.20 -56.8 -55.8 -56.1 68 -99 SPO 1997 10 16 20 49 65 4.1 -9 676.20 -56.8 -55.8 -56.1 68 -99 SPO 1997 10 16 20 50 65 4.1 -9 676.20 -56.8 -55.8 -56.2 68 -99 SPO 1997 10 16 20 51 65 4.1 -9 676.20 -56.8 -55.7 -56.2 68 -99 SPO 1997 10 16 20 52 66 4.1 -9 676.20 -56.9 -55.6 -56.2 68 -99 SPO 1997 10 16 20 53 67 4.1 -9 676.20 -56.9 -55.7 -56.2 68 -99 SPO 1997 10 16 20 54 67 4.1 -9 676.20 -56.9 -55.7 -56.2 68 -99 SPO 1997 10 16 20 55 68 4.0 -9 676.20 -56.9 -55.7 -56.2 68 -99 SPO 1997 10 16 20 56 69 3.9 -9 676.20 -57.0 -55.7 -56.2 68 -99 SPO 1997 10 16 20 57 70 4.0 -9 676.20 -57.0 -55.8 -56.2 68 -99 SPO 1997 10 16 20 58 72 3.9 -9 676.20 -57.1 -55.8 -56.3 69 -99 SPO 1997 10 16 20 59 72 4.0 -9 676.20 -57.1 -55.8 -56.3 69 -99 SPO 1997 10 16 21 00 71 4.2 -9 676.20 -57.2 -55.8 -56.4 69 0 SPO 1997 10 16 21 01 70 4.3 -9 676.20 -57.2 -55.8 -56.4 68 -99 SPO 1997 10 16 21 02 68 4.4 -9 676.20 -57.2 -55.7 -56.5 68 -99 SPO 1997 10 16 21 03 67 4.5 -9 676.20 -57.2 -55.7 -56.5 67 -99 SPO 1997 10 16 21 04 67 4.5 -9 676.20 -57.2 -55.7 -56.6 66 -99 SPO 1997 10 16 21 05 66 4.4 -9 676.20 -57.2 -55.7 -56.6 65 -99 SPO 1997 10 16 21 06 66 4.5 -9 676.20 -57.2 -55.7 -56.6 65 -99 SPO 1997 10 16 21 07 66 4.4 -9 676.20 -57.2 -55.7 -56.6 66 -99 SPO 1997 10 16 21 08 67 4.6 -9 676.10 -57.2 -55.7 -56.6 66 -99 SPO 1997 10 16 21 09 66 4.5 -9 676.10 -57.2 -55.7 -56.6 67 -99 SPO 1997 10 16 21 10 66 4.4 -9 676.10 -57.3 -55.7 -56.6 67 -99 SPO 1997 10 16 21 11 67 4.5 -9 676.10 -57.2 -55.7 -56.6 67 -99 SPO 1997 10 16 21 12 67 4.5 -9 676.10 -57.2 -55.7 -56.6 67 -99 SPO 1997 10 16 21 13 68 4.3 -9 676.10 -57.2 -55.7 -56.6 66 -99 SPO 1997 10 16 21 14 70 4.1 -9 676.10 -57.2 -55.7 -56.6 66 -99 SPO 1997 10 16 21 15 72 3.9 -9 676.20 -57.3 -55.8 -56.6 67 -99 SPO 1997 10 16 21 16 75 3.7 -9 676.20 -57.4 -55.8 -56.5 67 -99 SPO 1997 10 16 21 17 75 3.6 -9 676.20 -57.4 -55.8 -56.6 66 -99 SPO 1997 10 16 21 18 75 3.5 -9 676.20 -57.5 -55.8 -56.6 67 -99 SPO 1997 10 16 21 19 73 3.5 -9 676.20 -57.5 -55.9 -56.6 67 -99 SPO 1997 10 16 21 20 73 3.7 -9 676.20 -57.5 -55.9 -56.6 67 -99 SPO 1997 10 16 21 21 72 4.2 -9 676.10 -57.6 -55.8 -56.7 67 -99 SPO 1997 10 16 21 22 72 4.2 -9 676.10 -57.6 -55.8 -56.7 67 -99 SPO 1997 10 16 21 23 69 4.4 -9 676.10 -57.6 -55.8 -56.8 67 -99 SPO 1997 10 16 21 24 68 4.4 -9 676.10 -57.6 -55.7 -56.8 67 -99 SPO 1997 10 16 21 25 67 4.4 -9 676.10 -57.5 -55.7 -56.8 67 -99 SPO 1997 10 16 21 26 66 4.4 -9 676.10 -57.5 -55.8 -56.8 66 -99 SPO 1997 10 16 21 27 66 4.3 -9 676.10 -57.5 -55.8 -56.8 66 -99 SPO 1997 10 16 21 28 66 4.5 -9 676.10 -57.5 -55.7 -56.9 66 -99 SPO 1997 10 16 21 29 65 4.6 -9 676.10 -57.5 -55.6 -56.9 66 -99 SPO 1997 10 16 21 30 65 4.5 -9 676.10 -57.4 -55.5 -56.9 65 -99 SPO 1997 10 16 21 31 65 4.5 -9 676.10 -57.4 -55.6 -56.9 66 -99 SPO 1997 10 16 21 32 64 4.4 -9 676.10 -57.4 -55.7 -56.9 67 -99 SPO 1997 10 16 21 33 64 4.3 -9 676.10 -57.3 -55.6 -56.8 66 -99 SPO 1997 10 16 21 34 66 4.1 -9 676.10 -57.3 -55.7 -56.8 67 -99 SPO 1997 10 16 21 35 69 4.2 -9 676.10 -57.3 -55.6 -56.8 67 -99 SPO 1997 10 16 21 36 69 4.3 -9 676.10 -57.3 -55.5 -56.8 67 -99 SPO 1997 10 16 21 37 68 4.0 -9 676.10 -57.3 -55.6 -56.8 67 -99 SPO 1997 10 16 21 38 65 4.1 -9 676.10 -57.3 -55.6 -56.7 67 -99 SPO 1997 10 16 21 39 65 4.3 -9 676.10 -57.2 -55.5 -56.7 66 -99 SPO 1997 10 16 21 40 64 4.2 -9 676.10 -57.3 -55.6 -56.7 67 -99 SPO 1997 10 16 21 41 62 4.3 -9 676.10 -57.3 -55.4 -56.7 67 -99 SPO 1997 10 16 21 42 64 4.6 -9 676.10 -57.2 -55.4 -56.7 68 -99 SPO 1997 10 16 21 43 65 4.5 -9 676.10 -57.2 -55.4 -56.6 68 -99 SPO 1997 10 16 21 44 63 4.1 -9 676.10 -57.2 -55.4 -56.6 69 -99 SPO 1997 10 16 21 45 66 4.2 -9 676.10 -57.1 -55.3 -56.6 68 -99 SPO 1997 10 16 21 46 66 4.0 -9 676.10 -57.2 -55.4 -56.6 69 -99 SPO 1997 10 16 21 47 67 4.1 -9 676.10 -57.1 -55.4 -56.5 68 -99 SPO 1997 10 16 21 48 67 4.0 -9 676.10 -57.2 -55.4 -56.5 69 -99 SPO 1997 10 16 21 49 70 4.1 -9 676.20 -57.1 -55.4 -56.5 69 -99 SPO 1997 10 16 21 50 67 3.8 -9 676.20 -57.1 -55.4 -56.5 68 -99 SPO 1997 10 16 21 51 69 3.9 -9 676.20 -57.1 -55.4 -56.5 68 -99 SPO 1997 10 16 21 52 70 3.7 -9 676.20 -57.1 -55.4 -56.5 68 -99 SPO 1997 10 16 21 53 68 3.9 -9 676.20 -57.0 -55.4 -56.5 66 -99 SPO 1997 10 16 21 54 70 4.1 -9 676.20 -57.1 -55.5 -56.6 67 -99 SPO 1997 10 16 21 55 69 4.2 -9 676.10 -57.2 -55.4 -56.6 68 -99 SPO 1997 10 16 21 56 69 4.3 -9 676.10 -57.2 -55.4 -56.6 68 -99 SPO 1997 10 16 21 57 67 4.2 -9 676.10 -57.2 -55.5 -56.6 68 -99 SPO 1997 10 16 21 58 68 4.4 -9 676.10 -57.2 -55.4 -56.6 68 -99 SPO 1997 10 16 21 59 65 4.4 -9 676.10 -57.3 -55.4 -56.6 69 -99 SPO 1997 10 16 22 00 66 4.6 -9 676.10 -57.3 -55.4 -56.6 69 0 SPO 1997 10 16 22 01 63 4.8 -9 676.10 -57.3 -55.3 -56.6 69 -99 SPO 1997 10 16 22 02 62 4.8 -9 676.10 -57.2 -55.3 -56.5 68 -99 SPO 1997 10 16 22 03 62 4.9 -9 676.10 -57.1 -55.2 -56.4 68 -99 SPO 1997 10 16 22 04 60 5.0 -9 676.00 -57.2 -55.1 -56.4 68 -99 SPO 1997 10 16 22 05 61 5.2 -9 676.00 -57.1 -55.0 -56.4 68 -99 SPO 1997 10 16 22 06 60 5.1 -9 676.00 -57.1 -54.9 -56.3 68 -99 SPO 1997 10 16 22 07 59 5.2 -9 676.00 -57.1 -54.9 -56.3 68 -99 SPO 1997 10 16 22 08 59 5.3 -9 676.00 -57.0 -54.8 -56.2 68 -99 SPO 1997 10 16 22 09 59 5.4 -9 676.00 -57.0 -54.8 -56.2 68 -99 SPO 1997 10 16 22 10 58 5.6 -9 676.00 -56.9 -54.8 -56.1 67 -99 SPO 1997 10 16 22 11 58 5.5 -9 676.00 -56.9 -54.8 -56.1 67 -99 SPO 1997 10 16 22 12 58 5.6 -9 676.00 -56.8 -54.7 -56.1 67 -99 SPO 1997 10 16 22 13 58 5.6 -9 676.00 -56.8 -54.8 -56.1 68 -99 SPO 1997 10 16 22 14 58 5.6 -9 676.00 -56.8 -54.7 -56.1 67 -99 SPO 1997 10 16 22 15 58 5.5 -9 676.00 -56.9 -54.7 -56.0 68 -99 SPO 1997 10 16 22 16 58 5.5 -9 676.00 -56.9 -54.6 -56.0 68 -99 SPO 1997 10 16 22 17 58 5.4 -9 676.00 -56.8 -54.5 -56.0 67 -99 SPO 1997 10 16 22 18 58 5.3 -9 676.00 -56.8 -54.6 -56.0 67 -99 SPO 1997 10 16 22 19 58 5.3 -9 676.00 -56.8 -54.6 -56.0 67 -99 SPO 1997 10 16 22 20 59 5.3 -9 676.00 -56.8 -54.6 -56.0 68 -99 SPO 1997 10 16 22 21 58 5.4 -9 676.00 -56.8 -54.6 -56.0 68 -99 SPO 1997 10 16 22 22 59 5.4 -9 676.00 -56.9 -54.6 -56.0 68 -99 SPO 1997 10 16 22 23 59 5.3 -9 676.00 -56.9 -54.6 -56.0 69 -99 SPO 1997 10 16 22 24 58 5.4 -9 676.00 -56.8 -54.5 -55.9 68 -99 SPO 1997 10 16 22 25 58 5.5 -9 676.00 -56.9 -54.5 -56.0 69 -99 SPO 1997 10 16 22 26 58 5.3 -9 676.00 -56.8 -54.6 -55.9 68 -99 SPO 1997 10 16 22 27 58 5.3 -9 676.00 -56.8 -54.6 -55.9 68 -99 SPO 1997 10 16 22 28 57 5.4 -9 676.00 -56.8 -54.7 -55.9 67 -99 SPO 1997 10 16 22 29 57 5.4 -9 676.00 -56.8 -54.6 -55.9 67 -99 SPO 1997 10 16 22 30 57 5.6 -9 676.00 -56.8 -54.6 -55.9 67 -99 SPO 1997 10 16 22 31 57 5.5 -9 676.00 -56.8 -54.6 -55.9 68 -99 SPO 1997 10 16 22 32 56 5.5 -9 676.00 -56.8 -54.6 -56.0 68 -99 SPO 1997 10 16 22 33 56 5.6 -9 676.00 -56.8 -54.6 -56.2 68 -99 SPO 1997 10 16 22 34 56 5.7 -9 676.00 -56.8 -54.5 -56.3 68 -99 SPO 1997 10 16 22 35 56 5.8 -9 676.00 -56.8 -54.4 -56.3 68 -99 SPO 1997 10 16 22 36 55 5.7 -9 676.00 -56.8 -54.4 -56.3 69 -99 SPO 1997 10 16 22 37 55 5.9 -9 676.00 -56.8 -54.4 -56.3 69 -99 SPO 1997 10 16 22 38 55 5.8 -9 676.00 -56.8 -54.4 -56.2 68 -99 SPO 1997 10 16 22 39 55 5.8 -9 675.80 -56.8 -54.4 -56.1 68 -99 SPO 1997 10 16 22 40 54 5.5 -9 675.80 -56.8 -54.4 -56.0 68 -99 SPO 1997 10 16 22 41 54 5.7 -9 675.80 -56.8 -54.4 -56.0 68 -99 SPO 1997 10 16 22 42 54 5.7 -9 675.80 -56.8 -54.4 -56.0 68 -99 SPO 1997 10 16 22 43 54 5.6 -9 675.80 -56.8 -54.4 -56.0 68 -99 SPO 1997 10 16 22 44 54 5.5 -9 675.80 -56.8 -54.4 -55.9 68 -99 SPO 1997 10 16 22 45 55 5.6 -9 675.80 -56.8 -54.3 -55.9 68 -99 SPO 1997 10 16 22 46 56 5.8 -9 675.80 -56.8 -54.2 -56.0 68 -99 SPO 1997 10 16 22 47 56 5.5 -9 675.90 -56.7 -54.1 -55.9 68 -99 SPO 1997 10 16 22 48 56 5.6 -9 675.90 -56.8 -54.3 -55.9 68 -99 SPO 1997 10 16 22 49 56 5.6 -9 675.90 -56.8 -54.3 -55.9 68 -99 SPO 1997 10 16 22 50 56 5.6 -9 675.90 -56.8 -54.4 -55.9 68 -99 SPO 1997 10 16 22 51 57 5.5 -9 675.90 -56.8 -54.3 -56.0 68 -99 SPO 1997 10 16 22 52 57 5.8 -9 675.90 -56.8 -54.2 -56.0 68 -99 SPO 1997 10 16 22 53 58 5.6 -9 675.80 -56.8 -54.2 -56.0 68 -99 SPO 1997 10 16 22 54 56 5.7 -9 675.80 -56.8 -54.1 -56.2 67 -99 SPO 1997 10 16 22 55 57 5.8 -9 675.80 -56.8 -54.0 -56.3 67 -99 SPO 1997 10 16 22 56 57 6.2 -9 675.80 -56.7 -54.0 -56.3 66 -99 SPO 1997 10 16 22 57 58 6.1 -9 675.80 -56.6 -53.9 -56.3 65 -99 SPO 1997 10 16 22 58 59 5.9 -9 675.80 -56.6 -54.0 -56.3 66 -99 SPO 1997 10 16 22 59 59 5.9 -9 675.80 -56.6 -54.1 -56.3 67 -99 SPO 1997 10 16 23 00 59 5.7 -9 675.80 -56.6 -54.3 -56.3 67 0 SPO 1997 10 16 23 01 60 5.8 -9 675.80 -56.6 -54.3 -56.2 67 -99 SPO 1997 10 16 23 02 60 5.6 -9 675.80 -56.6 -54.5 -56.2 66 -99 SPO 1997 10 16 23 03 61 5.8 -9 675.80 -56.6 -54.4 -56.0 66 -99 SPO 1997 10 16 23 04 61 5.7 -9 675.80 -56.6 -54.5 -56.0 66 -99 SPO 1997 10 16 23 05 60 5.6 -9 675.70 -56.6 -54.5 -56.0 65 -99 SPO 1997 10 16 23 06 61 5.7 -9 675.70 -56.7 -54.4 -56.0 66 -99 SPO 1997 10 16 23 07 60 5.5 -9 675.70 -56.7 -54.5 -56.0 66 -99 SPO 1997 10 16 23 08 60 5.5 -9 675.70 -56.8 -54.7 -56.0 67 -99 SPO 1997 10 16 23 09 60 5.4 -9 675.70 -56.7 -54.8 -56.1 67 -99 SPO 1997 10 16 23 10 59 5.3 -9 675.70 -56.8 -54.7 -56.1 68 -99 SPO 1997 10 16 23 11 60 5.4 -9 675.80 -56.8 -54.7 -56.2 68 -99 SPO 1997 10 16 23 12 61 5.3 -9 675.80 -56.8 -54.7 -56.2 68 -99 SPO 1997 10 16 23 13 61 5.6 -9 675.70 -56.8 -54.7 -56.4 67 -99 SPO 1997 10 16 23 14 60 5.7 -9 675.80 -56.8 -54.7 -56.5 67 -99 SPO 1997 10 16 23 15 61 5.8 -9 675.70 -56.8 -54.7 -56.5 66 -99 SPO 1997 10 16 23 16 61 5.6 -9 675.70 -56.7 -54.7 -56.5 64 -99 SPO 1997 10 16 23 17 60 5.5 -9 675.70 -56.8 -54.8 -56.4 65 -99 SPO 1997 10 16 23 18 61 5.7 -9 675.70 -56.8 -54.8 -56.3 66 -99 SPO 1997 10 16 23 19 61 5.8 -9 675.70 -56.8 -54.6 -56.2 66 -99 SPO 1997 10 16 23 20 60 5.7 -9 675.70 -56.7 -54.7 -56.1 66 -99 SPO 1997 10 16 23 21 60 5.8 -9 675.70 -56.8 -54.8 -56.1 67 -99 SPO 1997 10 16 23 22 59 5.9 -9 675.70 -56.7 -54.8 -56.1 66 -99 SPO 1997 10 16 23 23 59 6.0 -9 675.70 -56.6 -54.7 -56.0 66 -99 SPO 1997 10 16 23 24 61 6.1 -9 675.70 -56.5 -54.5 -56.0 66 -99 SPO 1997 10 16 23 25 60 5.9 -9 675.70 -56.6 -54.6 -56.1 67 -99 SPO 1997 10 16 23 26 58 5.7 -9 675.70 -56.7 -54.7 -56.1 67 -99 SPO 1997 10 16 23 27 57 5.4 -9 675.70 -56.7 -54.8 -56.1 66 -99 SPO 1997 10 16 23 28 58 5.5 -9 675.70 -56.8 -54.8 -56.1 66 -99 SPO 1997 10 16 23 29 59 5.3 -9 675.70 -56.7 -54.8 -56.0 65 -99 SPO 1997 10 16 23 30 60 5.0 -9 675.70 -56.8 -54.8 -56.1 66 -99 SPO 1997 10 16 23 31 57 4.5 -9 675.70 -56.9 -55.0 -56.2 67 -99 SPO 1997 10 16 23 32 60 4.6 -9 675.70 -56.9 -55.0 -56.4 67 -99 SPO 1997 10 16 23 33 60 4.7 -9 675.70 -56.9 -55.0 -56.4 67 -99 SPO 1997 10 16 23 34 62 4.9 -9 675.70 -56.9 -55.0 -56.3 67 -99 SPO 1997 10 16 23 35 64 5.0 -9 675.70 -56.9 -54.8 -56.2 67 -99 SPO 1997 10 16 23 36 61 4.7 -9 675.70 -56.9 -54.9 -56.2 67 -99 SPO 1997 10 16 23 37 60 4.5 -9 675.70 -57.0 -55.2 -56.2 67 -99 SPO 1997 10 16 23 38 59 4.7 -9 675.70 -57.0 -55.3 -56.2 66 -99 SPO 1997 10 16 23 39 59 4.6 -9 675.70 -57.0 -55.1 -56.2 65 -99 SPO 1997 10 16 23 40 60 4.5 -9 675.70 -56.9 -55.3 -56.1 64 -99 SPO 1997 10 16 23 41 61 4.8 -9 675.70 -56.9 -55.3 -56.1 64 -99 SPO 1997 10 16 23 42 59 4.8 -9 675.70 -56.9 -55.2 -56.2 64 -99 SPO 1997 10 16 23 43 60 4.9 -9 675.70 -56.9 -55.1 -56.2 64 -99 SPO 1997 10 16 23 44 58 4.7 -9 675.70 -57.0 -55.1 -56.3 66 -99 SPO 1997 10 16 23 45 61 4.8 -9 675.70 -57.0 -55.2 -56.4 65 -99 SPO 1997 10 16 23 46 62 4.9 -9 675.70 -57.0 -55.0 -56.3 65 -99 SPO 1997 10 16 23 47 61 4.3 -9 675.70 -57.0 -55.1 -56.2 66 -99 SPO 1997 10 16 23 48 63 4.5 -9 675.70 -57.1 -55.3 -56.2 68 -99 SPO 1997 10 16 23 49 62 4.4 -9 675.70 -57.1 -55.1 -56.2 68 -99 SPO 1997 10 16 23 50 62 4.5 -9 675.70 -57.2 -55.3 -56.3 67 -99 SPO 1997 10 16 23 51 61 4.4 -9 675.70 -57.3 -55.2 -56.3 67 -99 SPO 1997 10 16 23 52 59 4.6 -9 675.70 -57.3 -55.1 -56.3 66 -99 SPO 1997 10 16 23 53 60 5.0 -9 675.70 -57.3 -55.0 -56.3 66 -99 SPO 1997 10 16 23 54 60 5.0 -9 675.70 -57.3 -54.7 -56.3 66 -99 SPO 1997 10 16 23 55 64 4.6 -9 675.60 -57.2 -54.8 -56.2 65 -99 SPO 1997 10 16 23 56 61 4.6 -9 675.60 -57.3 -55.0 -56.3 67 -99 SPO 1997 10 16 23 57 62 4.5 -9 675.70 -57.4 -54.8 -56.3 -99 -99 SPO 1997 10 16 23 58 61 4.5 -9 675.70 -57.5 -55.2 -56.4 -99 -99 SPO 1997 10 16 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 17 00 00 64 4.4 -9 675.70 -57.6 -55.0 -56.5 -99 0 SPO 1997 10 17 00 01 61 4.3 -9 675.70 -57.6 -55.2 -56.5 -99 -99 SPO 1997 10 17 00 02 64 4.3 -9 675.70 -57.7 -55.2 -56.5 -99 -99 SPO 1997 10 17 00 03 63 4.1 -9 675.70 -57.7 -55.3 -56.5 67 -99 SPO 1997 10 17 00 04 65 4.1 -9 675.70 -57.8 -55.3 -56.5 68 -99 SPO 1997 10 17 00 05 66 4.3 -9 675.80 -57.8 -55.0 -56.5 68 -99 SPO 1997 10 17 00 06 62 4.0 -9 675.80 -57.8 -55.3 -56.5 67 -99 SPO 1997 10 17 00 07 64 4.2 -9 675.70 -57.9 -55.1 -56.5 67 -99 SPO 1997 10 17 00 08 64 4.0 -9 675.70 -58.0 -55.2 -56.5 68 -99 SPO 1997 10 17 00 09 62 3.8 -9 675.70 -58.0 -55.3 -56.5 68 -99 SPO 1997 10 17 00 10 64 4.1 -9 675.70 -58.0 -55.3 -56.5 68 -99 SPO 1997 10 17 00 11 64 4.1 -9 675.70 -58.0 -55.2 -56.5 68 -99 SPO 1997 10 17 00 12 62 4.1 -9 675.70 -58.0 -55.3 -56.5 68 -99 SPO 1997 10 17 00 13 61 4.1 -9 675.70 -58.1 -55.3 -56.5 70 -99 SPO 1997 10 17 00 14 61 4.1 -9 675.70 -58.0 -55.3 -56.6 69 -99 SPO 1997 10 17 00 15 62 4.4 -9 675.70 -57.9 -55.0 -56.7 67 -99 SPO 1997 10 17 00 16 62 4.3 -9 675.70 -57.8 -55.0 -56.6 67 -99 SPO 1997 10 17 00 17 62 4.1 -9 675.70 -57.7 -55.0 -56.4 67 -99 SPO 1997 10 17 00 18 59 4.2 -9 675.70 -57.7 -55.1 -56.5 67 -99 SPO 1997 10 17 00 19 59 4.2 -9 675.70 -57.7 -55.2 -56.6 67 -99 SPO 1997 10 17 00 20 59 4.2 -9 675.70 -57.6 -55.1 -56.7 67 -99 SPO 1997 10 17 00 21 58 4.2 -9 675.70 -57.5 -55.0 -56.8 67 -99 SPO 1997 10 17 00 22 58 4.7 -9 675.70 -57.5 -54.9 -56.7 67 -99 SPO 1997 10 17 00 23 58 4.7 -9 675.70 -57.3 -54.6 -56.5 66 -99 SPO 1997 10 17 00 24 59 4.8 -9 675.70 -57.3 -54.7 -56.3 67 -99 SPO 1997 10 17 00 25 60 5.0 -9 675.70 -57.4 -54.6 -56.3 68 -99 SPO 1997 10 17 00 26 59 4.7 -9 675.70 -57.4 -54.6 -56.3 69 -99 SPO 1997 10 17 00 27 61 4.5 -9 675.70 -57.4 -54.7 -56.3 68 -99 SPO 1997 10 17 00 28 61 4.4 -9 675.70 -57.4 -55.0 -56.3 68 -99 SPO 1997 10 17 00 29 63 4.5 -9 675.70 -57.4 -55.0 -56.3 67 -99 SPO 1997 10 17 00 30 65 4.4 -9 675.70 -57.5 -55.0 -56.3 67 -99 SPO 1997 10 17 00 31 66 4.3 -9 675.70 -57.5 -55.3 -56.4 67 -99 SPO 1997 10 17 00 32 66 4.3 -9 675.80 -57.6 -55.3 -56.4 68 -99 SPO 1997 10 17 00 33 65 4.2 -9 675.70 -57.6 -55.2 -56.5 68 -99 SPO 1997 10 17 00 34 65 4.2 -9 675.80 -57.7 -55.2 -56.6 68 -99 SPO 1997 10 17 00 35 66 4.0 -9 675.80 -57.8 -55.2 -56.6 69 -99 SPO 1997 10 17 00 36 67 4.1 -9 675.80 -57.8 -55.2 -56.9 69 -99 SPO 1997 10 17 00 37 68 4.2 -9 675.80 -57.8 -55.1 -57.0 69 -99 SPO 1997 10 17 00 38 67 4.2 -9 675.80 -57.7 -55.0 -57.0 68 -99 SPO 1997 10 17 00 39 69 4.2 -9 675.70 -57.7 -55.0 -56.8 67 -99 SPO 1997 10 17 00 40 69 4.4 -9 675.80 -57.7 -55.0 -56.8 67 -99 SPO 1997 10 17 00 41 68 4.4 -9 675.70 -57.7 -55.2 -57.0 67 -99 SPO 1997 10 17 00 42 68 4.5 -9 675.70 -57.8 -55.2 -57.2 67 -99 SPO 1997 10 17 00 43 69 4.4 -9 675.70 -57.8 -55.2 -57.3 67 -99 SPO 1997 10 17 00 44 69 4.5 -9 675.70 -57.9 -55.1 -57.3 67 -99 SPO 1997 10 17 00 45 69 4.4 -9 675.70 -57.9 -55.2 -57.2 67 -99 SPO 1997 10 17 00 46 71 4.7 -9 675.70 -57.9 -55.1 -57.0 67 -99 SPO 1997 10 17 00 47 72 4.9 -9 675.70 -57.9 -55.1 -56.9 67 -99 SPO 1997 10 17 00 48 71 4.8 -9 675.70 -57.9 -55.2 -56.9 67 -99 SPO 1997 10 17 00 49 70 4.9 -9 675.70 -57.9 -55.2 -56.9 68 -99 SPO 1997 10 17 00 50 70 4.9 -9 675.70 -57.8 -55.2 -56.8 67 -99 SPO 1997 10 17 00 51 69 5.0 -9 675.60 -57.8 -55.0 -56.8 67 -99 SPO 1997 10 17 00 52 69 5.3 -9 675.60 -57.7 -55.0 -56.8 67 -99 SPO 1997 10 17 00 53 69 5.1 -9 675.60 -57.7 -54.9 -56.8 67 -99 SPO 1997 10 17 00 54 69 5.2 -9 675.60 -57.7 -54.7 -56.8 67 -99 SPO 1997 10 17 00 55 69 5.3 -9 675.60 -57.6 -54.7 -56.7 65 -99 SPO 1997 10 17 00 56 71 5.2 -9 675.70 -57.6 -54.7 -56.7 65 -99 SPO 1997 10 17 00 57 72 5.0 -9 675.70 -57.6 -54.8 -56.7 65 -99 SPO 1997 10 17 00 58 74 5.1 -9 675.70 -57.6 -54.8 -56.6 66 -99 SPO 1997 10 17 00 59 73 5.4 -9 675.70 -57.6 -54.9 -56.6 66 -99 SPO 1997 10 17 01 00 72 5.2 -9 675.70 -57.6 -55.0 -56.6 67 0 SPO 1997 10 17 01 01 73 5.2 -9 675.70 -57.4 -55.0 -56.5 65 -99 SPO 1997 10 17 01 02 73 5.3 -9 675.70 -57.4 -55.0 -56.4 66 -99 SPO 1997 10 17 01 03 73 5.3 -9 675.70 -57.3 -55.1 -56.4 66 -99 SPO 1997 10 17 01 04 71 5.3 -9 675.70 -57.3 -55.2 -56.5 67 -99 SPO 1997 10 17 01 05 70 5.2 -9 675.60 -57.4 -55.2 -56.6 67 -99 SPO 1997 10 17 01 06 69 5.1 -9 675.70 -57.4 -55.3 -56.6 67 -99 SPO 1997 10 17 01 07 69 5.0 -9 675.70 -57.6 -55.3 -56.8 67 -99 SPO 1997 10 17 01 08 69 4.9 -9 675.60 -57.7 -55.2 -56.9 67 -99 SPO 1997 10 17 01 09 68 4.9 -9 675.70 -57.8 -55.3 -56.9 67 -99 SPO 1997 10 17 01 10 69 5.0 -9 675.60 -57.8 -55.4 -56.9 66 -99 SPO 1997 10 17 01 11 69 5.2 -9 675.60 -57.8 -55.1 -56.9 66 -99 SPO 1997 10 17 01 12 70 5.5 -9 675.60 -57.8 -55.0 -56.9 65 -99 SPO 1997 10 17 01 13 68 4.9 -9 675.60 -57.8 -55.3 -56.9 65 -99 SPO 1997 10 17 01 14 67 4.7 -9 675.60 -58.0 -55.6 -56.9 66 -99 SPO 1997 10 17 01 15 68 5.2 -9 675.60 -58.0 -55.4 -57.0 66 -99 SPO 1997 10 17 01 16 65 4.8 -9 675.60 -58.0 -55.5 -57.0 66 -99 SPO 1997 10 17 01 17 68 4.7 -9 675.60 -58.0 -55.5 -57.0 66 -99 SPO 1997 10 17 01 18 66 4.7 -9 675.60 -58.1 -55.5 -57.0 66 -99 SPO 1997 10 17 01 19 65 4.9 -9 675.60 -58.1 -55.4 -57.0 66 -99 SPO 1997 10 17 01 20 66 5.2 -9 675.60 -58.1 -55.3 -57.1 64 -99 SPO 1997 10 17 01 21 63 4.9 -9 675.60 -58.0 -55.4 -57.0 63 -99 SPO 1997 10 17 01 22 65 4.9 -9 675.60 -58.0 -55.3 -57.0 65 -99 SPO 1997 10 17 01 23 65 4.9 -9 675.50 -58.0 -55.3 -57.0 65 -99 SPO 1997 10 17 01 24 68 5.2 -9 675.50 -57.9 -55.3 -56.9 65 -99 SPO 1997 10 17 01 25 67 4.9 -9 675.50 -57.8 -55.3 -56.8 64 -99 SPO 1997 10 17 01 26 69 5.0 -9 675.50 -57.8 -55.2 -56.8 65 -99 SPO 1997 10 17 01 27 67 4.4 -9 675.50 -57.8 -55.4 -56.7 66 -99 SPO 1997 10 17 01 28 68 4.4 -9 675.50 -57.8 -55.4 -56.8 65 -99 SPO 1997 10 17 01 29 67 4.2 -9 675.50 -57.9 -55.5 -56.8 66 -99 SPO 1997 10 17 01 30 67 4.4 -9 675.50 -57.9 -55.6 -56.8 66 -99 SPO 1997 10 17 01 31 68 4.4 -9 675.50 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 32 69 4.3 -9 675.50 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 33 68 4.3 -9 675.50 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 34 68 4.3 -9 675.50 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 35 69 4.3 -9 675.60 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 36 70 4.1 -9 675.50 -58.0 -55.5 -56.8 66 -99 SPO 1997 10 17 01 37 70 4.1 -9 675.60 -58.0 -55.6 -56.8 66 -99 SPO 1997 10 17 01 38 70 4.0 -9 675.60 -58.0 -55.6 -56.8 67 -99 SPO 1997 10 17 01 39 71 4.0 -9 675.60 -58.0 -55.6 -56.7 66 -99 SPO 1997 10 17 01 40 71 4.0 -9 675.60 -58.0 -55.6 -56.7 66 -99 SPO 1997 10 17 01 41 70 4.1 -9 675.50 -58.0 -55.7 -56.7 66 -99 SPO 1997 10 17 01 42 70 4.2 -9 675.60 -58.0 -55.7 -56.7 66 -99 SPO 1997 10 17 01 43 72 4.3 -9 675.60 -58.0 -55.5 -56.6 66 -99 SPO 1997 10 17 01 44 73 4.5 -9 675.60 -58.0 -55.5 -56.6 66 -99 SPO 1997 10 17 01 45 73 4.2 -9 675.50 -58.0 -55.4 -56.6 65 -99 SPO 1997 10 17 01 46 74 4.0 -9 675.50 -58.0 -55.7 -56.6 65 -99 SPO 1997 10 17 01 47 73 4.0 -9 675.50 -58.1 -55.8 -56.6 66 -99 SPO 1997 10 17 01 48 71 4.0 -9 675.50 -58.1 -55.7 -56.6 66 -99 SPO 1997 10 17 01 49 71 4.1 -9 675.50 -58.1 -55.8 -56.6 67 -99 SPO 1997 10 17 01 50 70 4.0 -9 675.50 -58.1 -55.7 -56.6 67 -99 SPO 1997 10 17 01 51 72 4.1 -9 675.50 -58.0 -55.7 -56.6 66 -99 SPO 1997 10 17 01 52 72 4.0 -9 675.50 -58.0 -55.6 -56.5 66 -99 SPO 1997 10 17 01 53 74 4.1 -9 675.50 -58.1 -55.8 -56.6 67 -99 SPO 1997 10 17 01 54 74 3.8 -9 675.50 -58.1 -55.7 -56.5 67 -99 SPO 1997 10 17 01 55 74 3.6 -9 675.50 -58.1 -55.9 -56.6 66 -99 SPO 1997 10 17 01 56 74 3.7 -9 675.50 -58.2 -55.9 -56.5 66 -99 SPO 1997 10 17 01 57 73 3.6 -9 675.50 -58.1 -55.8 -56.5 66 -99 SPO 1997 10 17 01 58 73 3.5 -9 675.50 -58.1 -55.8 -56.4 66 -99 SPO 1997 10 17 01 59 74 3.5 -9 675.50 -58.1 -55.8 -56.3 66 -99 SPO 1997 10 17 02 00 75 3.6 -9 675.50 -58.1 -55.6 -56.2 66 0 SPO 1997 10 17 02 01 75 3.5 -9 675.50 -58.0 -55.5 -56.2 65 -99 SPO 1997 10 17 02 02 77 3.3 -9 675.50 -58.0 -55.6 -56.2 66 -99 SPO 1997 10 17 02 03 78 3.2 -9 675.50 -58.0 -55.8 -56.1 66 -99 SPO 1997 10 17 02 04 82 3.0 -9 675.50 -58.1 -56.0 -56.0 67 -99 SPO 1997 10 17 02 05 85 3.1 -9 675.50 -58.1 -56.0 -56.0 67 -99 SPO 1997 10 17 02 06 89 3.0 -9 675.60 -58.2 -56.0 -56.2 68 -99 SPO 1997 10 17 02 07 92 2.9 -9 675.60 -58.4 -56.1 -56.8 70 -99 SPO 1997 10 17 02 08 92 3.2 -9 675.60 -58.5 -56.2 -57.1 71 -99 SPO 1997 10 17 02 09 91 3.2 -9 675.60 -58.4 -56.1 -57.0 68 -99 SPO 1997 10 17 02 10 89 3.3 -9 675.60 -58.3 -56.1 -56.8 67 -99 SPO 1997 10 17 02 11 92 3.2 -9 675.60 -58.2 -56.0 -56.7 66 -99 SPO 1997 10 17 02 12 93 3.2 -9 675.50 -58.2 -56.0 -56.6 66 -99 SPO 1997 10 17 02 13 94 3.3 -9 675.50 -58.2 -56.0 -56.6 67 -99 SPO 1997 10 17 02 14 91 3.3 -9 675.50 -58.2 -56.1 -56.6 67 -99 SPO 1997 10 17 02 15 91 3.7 -9 675.50 -58.2 -56.0 -56.4 67 -99 SPO 1997 10 17 02 16 86 3.9 -9 675.50 -58.1 -56.0 -56.4 66 -99 SPO 1997 10 17 02 17 83 3.9 -9 675.50 -58.1 -56.0 -56.3 66 -99 SPO 1997 10 17 02 18 81 4.0 -9 675.50 -58.0 -56.1 -56.2 66 -99 SPO 1997 10 17 02 19 80 4.0 -9 675.50 -57.9 -56.1 -56.2 67 -99 SPO 1997 10 17 02 20 77 4.1 -9 675.50 -57.9 -56.2 -56.2 67 -99 SPO 1997 10 17 02 21 79 4.2 -9 675.50 -57.9 -56.0 -56.2 67 -99 SPO 1997 10 17 02 22 76 4.1 -9 675.40 -58.0 -56.2 -56.3 68 -99 SPO 1997 10 17 02 23 76 4.0 -9 675.40 -58.0 -56.2 -56.3 68 -99 SPO 1997 10 17 02 24 76 4.0 -9 675.40 -58.0 -56.2 -56.3 68 -99 SPO 1997 10 17 02 25 74 4.2 -9 675.40 -58.0 -56.2 -56.4 67 -99 SPO 1997 10 17 02 26 71 4.2 -9 675.40 -58.0 -56.1 -56.4 68 -99 SPO 1997 10 17 02 27 72 4.4 -9 675.40 -58.0 -56.0 -56.5 68 -99 SPO 1997 10 17 02 28 71 4.3 -9 675.40 -58.0 -56.0 -56.6 68 -99 SPO 1997 10 17 02 29 70 4.3 -9 675.40 -57.9 -55.9 -56.6 68 -99 SPO 1997 10 17 02 30 71 4.5 -9 675.40 -57.9 -55.9 -56.6 69 -99 SPO 1997 10 17 02 31 69 4.3 -9 675.30 -57.8 -55.9 -56.6 68 -99 SPO 1997 10 17 02 32 70 4.6 -9 675.30 -57.8 -55.8 -56.6 69 -99 SPO 1997 10 17 02 33 69 4.5 -9 675.30 -57.8 -55.6 -56.6 68 -99 SPO 1997 10 17 02 34 69 4.7 -9 675.30 -57.8 -55.6 -56.6 68 -99 SPO 1997 10 17 02 35 69 4.8 -9 675.30 -57.9 -55.7 -56.7 68 -99 SPO 1997 10 17 02 36 67 4.7 -9 675.30 -57.9 -55.6 -56.8 68 -99 SPO 1997 10 17 02 37 67 4.9 -9 675.30 -57.9 -55.6 -56.8 68 -99 SPO 1997 10 17 02 38 67 4.8 -9 675.20 -58.0 -55.6 -56.9 68 -99 SPO 1997 10 17 02 39 67 5.2 -9 675.20 -58.0 -55.6 -57.0 68 -99 SPO 1997 10 17 02 40 64 5.0 -9 675.20 -58.0 -55.6 -57.0 69 -99 SPO 1997 10 17 02 41 64 5.0 -9 675.20 -58.0 -55.4 -57.0 69 -99 SPO 1997 10 17 02 42 65 5.0 -9 675.20 -57.9 -55.3 -56.9 68 -99 SPO 1997 10 17 02 43 64 5.2 -9 675.20 -57.8 -55.3 -56.9 67 -99 SPO 1997 10 17 02 44 65 5.0 -9 675.20 -57.8 -55.4 -56.9 68 -99 SPO 1997 10 17 02 45 65 5.1 -9 675.20 -57.6 -55.4 -56.8 67 -99 SPO 1997 10 17 02 46 65 5.2 -9 675.20 -57.6 -55.4 -56.8 67 -99 SPO 1997 10 17 02 47 67 5.2 -9 675.20 -57.6 -55.4 -56.7 67 -99 SPO 1997 10 17 02 48 69 5.0 -9 675.20 -57.5 -55.4 -56.7 66 -99 SPO 1997 10 17 02 49 69 4.9 -9 675.20 -57.5 -55.5 -56.7 66 -99 SPO 1997 10 17 02 50 70 4.8 -9 675.20 -57.5 -55.5 -56.7 66 -99 SPO 1997 10 17 02 51 72 4.8 -9 675.20 -57.6 -55.6 -56.7 67 -99 SPO 1997 10 17 02 52 73 4.9 -9 675.20 -57.6 -55.7 -56.7 67 -99 SPO 1997 10 17 02 53 73 4.7 -9 675.20 -57.6 -55.7 -56.6 67 -99 SPO 1997 10 17 02 54 74 4.6 -9 675.20 -57.6 -55.7 -56.5 67 -99 SPO 1997 10 17 02 55 74 4.5 -9 675.20 -57.7 -55.7 -56.4 68 -99 SPO 1997 10 17 02 56 75 4.5 -9 675.20 -57.7 -55.8 -56.4 68 -99 SPO 1997 10 17 02 57 76 4.4 -9 675.20 -57.8 -55.8 -56.4 68 -99 SPO 1997 10 17 02 58 75 4.5 -9 675.20 -57.8 -55.8 -56.4 67 -99 SPO 1997 10 17 02 59 77 4.6 -9 675.20 -57.8 -55.8 -56.3 67 -99 SPO 1997 10 17 03 00 78 4.7 -9 675.20 -57.7 -55.6 -56.3 66 0 SPO 1997 10 17 03 01 78 4.7 -9 675.20 -57.7 -55.6 -56.3 66 -99 SPO 1997 10 17 03 02 80 4.8 -9 675.20 -57.7 -55.6 -56.3 66 -99 SPO 1997 10 17 03 03 81 4.8 -9 675.20 -57.6 -55.6 -56.2 66 -99 SPO 1997 10 17 03 04 81 4.7 -9 675.20 -57.6 -55.7 -56.2 66 -99 SPO 1997 10 17 03 05 80 4.7 -9 675.20 -57.6 -55.8 -56.2 66 -99 SPO 1997 10 17 03 06 78 4.2 -9 675.20 -57.6 -56.0 -56.2 66 -99 SPO 1997 10 17 03 07 78 4.1 -9 675.20 -57.7 -56.1 -56.2 67 -99 SPO 1997 10 17 03 08 78 4.0 -9 675.20 -57.8 -56.2 -56.2 67 -99 SPO 1997 10 17 03 09 76 4.1 -9 675.20 -57.9 -56.1 -56.3 68 -99 SPO 1997 10 17 03 10 75 4.4 -9 675.20 -57.9 -55.9 -56.4 67 -99 SPO 1997 10 17 03 11 73 4.4 -9 675.20 -58.0 -55.8 -56.6 68 -99 SPO 1997 10 17 03 12 74 4.6 -9 675.20 -58.0 -55.7 -56.6 66 -99 SPO 1997 10 17 03 13 72 4.6 -9 675.20 -57.9 -55.8 -56.6 66 -99 SPO 1997 10 17 03 14 71 4.8 -9 675.10 -57.8 -55.7 -56.7 65 -99 SPO 1997 10 17 03 15 71 4.9 -9 675.10 -57.7 -55.6 -56.6 66 -99 SPO 1997 10 17 03 16 69 4.9 -9 675.10 -57.6 -55.6 -56.6 65 -99 SPO 1997 10 17 03 17 70 5.1 -9 675.10 -57.6 -55.5 -56.6 66 -99 SPO 1997 10 17 03 18 69 5.5 -9 675.10 -57.4 -55.4 -56.5 65 -99 SPO 1997 10 17 03 19 68 5.2 -9 675.10 -57.3 -55.3 -56.4 65 -99 SPO 1997 10 17 03 20 70 5.2 -9 675.10 -57.2 -55.3 -56.3 65 -99 SPO 1997 10 17 03 21 70 5.2 -9 675.10 -57.2 -55.4 -56.3 66 -99 SPO 1997 10 17 03 22 71 5.3 -9 675.10 -57.1 -55.4 -56.3 65 -99 SPO 1997 10 17 03 23 71 5.2 -9 675.10 -57.1 -55.4 -56.3 65 -99 SPO 1997 10 17 03 24 68 5.0 -9 675.10 -57.2 -55.5 -56.3 66 -99 SPO 1997 10 17 03 25 69 5.2 -9 675.10 -57.2 -55.5 -56.4 66 -99 SPO 1997 10 17 03 26 69 5.4 -9 675.10 -57.2 -55.5 -56.4 66 -99 SPO 1997 10 17 03 27 67 5.4 -9 675.10 -57.2 -55.5 -56.5 67 -99 SPO 1997 10 17 03 28 67 5.6 -9 675.10 -57.3 -55.4 -56.6 68 -99 SPO 1997 10 17 03 29 67 5.7 -9 675.10 -57.2 -55.4 -56.6 67 -99 SPO 1997 10 17 03 30 66 5.5 -9 675.00 -57.2 -55.4 -56.5 67 -99 SPO 1997 10 17 03 31 67 5.6 -9 675.00 -57.2 -55.3 -56.5 67 -99 SPO 1997 10 17 03 32 65 5.4 -9 675.00 -57.2 -55.4 -56.5 68 -99 SPO 1997 10 17 03 33 67 5.5 -9 675.00 -57.2 -55.3 -56.5 68 -99 SPO 1997 10 17 03 34 67 5.6 -9 675.00 -57.2 -55.3 -56.5 67 -99 SPO 1997 10 17 03 35 67 5.3 -9 675.00 -57.1 -55.2 -56.5 65 -99 SPO 1997 10 17 03 36 69 5.2 -9 675.00 -57.1 -55.3 -56.4 65 -99 SPO 1997 10 17 03 37 69 4.9 -9 675.00 -57.1 -55.4 -56.4 64 -99 SPO 1997 10 17 03 38 68 4.5 -9 675.10 -57.2 -55.6 -56.4 65 -99 SPO 1997 10 17 03 39 67 4.3 -9 675.10 -57.2 -55.8 -56.3 65 -99 SPO 1997 10 17 03 40 67 4.2 -9 675.10 -57.3 -56.0 -56.3 66 -99 SPO 1997 10 17 03 41 66 4.3 -9 675.00 -57.3 -55.9 -56.4 66 -99 SPO 1997 10 17 03 42 64 4.3 -9 675.00 -57.3 -56.0 -56.4 66 -99 SPO 1997 10 17 03 43 63 4.4 -9 675.00 -57.3 -55.9 -56.4 66 -99 SPO 1997 10 17 03 44 64 4.5 -9 675.00 -57.3 -55.8 -56.3 66 -99 SPO 1997 10 17 03 45 63 4.5 -9 675.00 -57.3 -55.8 -56.3 66 -99 SPO 1997 10 17 03 46 64 4.6 -9 675.00 -57.2 -55.7 -56.3 65 -99 SPO 1997 10 17 03 47 64 4.7 -9 675.00 -57.2 -55.6 -56.3 65 -99 SPO 1997 10 17 03 48 64 4.8 -9 675.00 -57.2 -55.4 -56.3 65 -99 SPO 1997 10 17 03 49 64 5.0 -9 675.00 -57.3 -55.4 -56.4 67 -99 SPO 1997 10 17 03 50 63 5.0 -9 675.00 -57.3 -55.2 -56.4 67 -99 SPO 1997 10 17 03 51 63 4.7 -9 675.00 -57.3 -55.2 -56.4 67 -99 SPO 1997 10 17 03 52 63 4.7 -9 675.00 -57.3 -55.3 -56.3 67 -99 SPO 1997 10 17 03 53 63 4.5 -9 675.00 -57.3 -55.4 -56.3 67 -99 SPO 1997 10 17 03 54 64 4.4 -9 675.00 -57.3 -55.4 -56.3 67 -99 SPO 1997 10 17 03 55 65 4.6 -9 675.00 -57.3 -55.4 -56.3 67 -99 SPO 1997 10 17 03 56 65 4.6 -9 675.00 -57.2 -55.4 -56.3 67 -99 SPO 1997 10 17 03 57 65 4.7 -9 675.00 -57.2 -55.4 -56.3 68 -99 SPO 1997 10 17 03 58 65 4.7 -9 675.00 -57.1 -55.3 -56.2 67 -99 SPO 1997 10 17 03 59 64 4.8 -9 675.00 -57.1 -55.3 -56.2 66 -99 SPO 1997 10 17 04 00 64 5.0 -9 675.00 -57.0 -55.0 -56.2 65 0 SPO 1997 10 17 04 01 63 5.0 -9 675.00 -56.9 -54.8 -56.1 64 -99 SPO 1997 10 17 04 02 65 5.1 -9 674.90 -56.9 -54.8 -56.1 65 -99 SPO 1997 10 17 04 03 65 5.0 -9 674.90 -56.8 -54.7 -56.0 65 -99 SPO 1997 10 17 04 04 64 4.9 -9 674.90 -56.8 -54.7 -56.0 65 -99 SPO 1997 10 17 04 05 64 4.8 -9 675.00 -56.9 -54.8 -56.0 67 -99 SPO 1997 10 17 04 06 65 4.6 -9 675.00 -56.9 -54.8 -56.0 68 -99 SPO 1997 10 17 04 07 64 4.4 -9 675.00 -57.0 -55.0 -56.0 68 -99 SPO 1997 10 17 04 08 64 4.5 -9 675.00 -57.0 -55.1 -56.0 68 -99 SPO 1997 10 17 04 09 65 4.5 -9 675.00 -57.0 -55.0 -56.0 68 -99 SPO 1997 10 17 04 10 66 4.7 -9 674.90 -57.0 -55.0 -56.0 68 -99 SPO 1997 10 17 04 11 67 5.0 -9 674.90 -56.9 -54.9 -56.0 67 -99 SPO 1997 10 17 04 12 68 5.0 -9 674.90 -57.0 -54.8 -56.1 68 -99 SPO 1997 10 17 04 13 69 4.7 -9 674.90 -57.0 -54.8 -56.1 68 -99 SPO 1997 10 17 04 14 70 4.7 -9 675.00 -57.1 -54.9 -56.1 68 -99 SPO 1997 10 17 04 15 71 4.6 -9 674.90 -57.1 -54.9 -56.2 67 -99 SPO 1997 10 17 04 16 73 4.6 -9 675.00 -57.2 -54.9 -56.2 68 -99 SPO 1997 10 17 04 17 74 4.5 -9 675.00 -57.2 -55.0 -56.2 68 -99 SPO 1997 10 17 04 18 75 4.5 -9 675.00 -57.3 -55.1 -56.2 67 -99 SPO 1997 10 17 04 19 77 4.5 -9 674.90 -57.4 -55.1 -56.2 68 -99 SPO 1997 10 17 04 20 78 4.4 -9 675.00 -57.4 -55.1 -56.2 67 -99 SPO 1997 10 17 04 21 80 4.5 -9 674.90 -57.5 -55.2 -56.2 68 -99 SPO 1997 10 17 04 22 80 4.4 -9 675.00 -57.5 -55.2 -56.2 67 -99 SPO 1997 10 17 04 23 81 4.5 -9 675.00 -57.5 -55.1 -56.2 67 -99 SPO 1997 10 17 04 24 83 4.4 -9 674.90 -57.5 -55.1 -56.2 67 -99 SPO 1997 10 17 04 25 83 4.6 -9 675.00 -57.6 -55.2 -56.2 67 -99 SPO 1997 10 17 04 26 85 4.7 -9 675.00 -57.5 -55.2 -56.3 65 -99 SPO 1997 10 17 04 27 84 4.5 -9 675.00 -57.5 -55.2 -56.2 65 -99 SPO 1997 10 17 04 28 84 4.3 -9 675.00 -57.5 -55.3 -56.2 65 -99 SPO 1997 10 17 04 29 83 4.4 -9 675.00 -57.5 -55.3 -56.2 66 -99 SPO 1997 10 17 04 30 83 4.3 -9 675.00 -57.4 -55.3 -56.1 65 -99 SPO 1997 10 17 04 31 82 4.2 -9 675.00 -57.4 -55.3 -56.1 66 -99 SPO 1997 10 17 04 32 81 3.9 -9 674.90 -57.5 -55.3 -56.1 67 -99 SPO 1997 10 17 04 33 81 3.9 -9 674.90 -57.4 -55.3 -56.1 66 -99 SPO 1997 10 17 04 34 80 4.0 -9 675.00 -57.4 -55.4 -56.1 67 -99 SPO 1997 10 17 04 35 79 3.9 -9 674.90 -57.4 -55.4 -56.1 67 -99 SPO 1997 10 17 04 36 79 4.1 -9 674.90 -57.4 -55.3 -56.2 67 -99 SPO 1997 10 17 04 37 80 4.2 -9 675.00 -57.4 -55.2 -56.1 67 -99 SPO 1997 10 17 04 38 80 4.2 -9 674.90 -57.3 -55.1 -56.0 66 -99 SPO 1997 10 17 04 39 77 4.2 -9 675.00 -57.3 -55.1 -56.1 66 -99 SPO 1997 10 17 04 40 77 4.1 -9 674.90 -57.3 -55.2 -56.2 65 -99 SPO 1997 10 17 04 41 76 4.2 -9 674.90 -57.3 -55.2 -56.2 65 -99 SPO 1997 10 17 04 42 76 4.3 -9 674.90 -57.4 -55.2 -56.2 67 -99 SPO 1997 10 17 04 43 75 4.3 -9 674.90 -57.4 -55.2 -56.3 67 -99 SPO 1997 10 17 04 44 77 4.3 -9 674.90 -57.4 -55.2 -56.3 67 -99 SPO 1997 10 17 04 45 76 4.5 -9 674.90 -57.4 -55.2 -56.3 67 -99 SPO 1997 10 17 04 46 76 4.3 -9 674.90 -57.5 -55.2 -56.4 67 -99 SPO 1997 10 17 04 47 77 4.7 -9 674.90 -57.5 -55.2 -56.4 67 -99 SPO 1997 10 17 04 48 76 4.7 -9 674.90 -57.5 -55.2 -56.4 67 -99 SPO 1997 10 17 04 49 76 4.8 -9 674.80 -57.4 -55.0 -56.5 67 -99 SPO 1997 10 17 04 50 76 4.8 -9 674.80 -57.5 -54.9 -56.5 67 -99 SPO 1997 10 17 04 51 74 4.5 -9 674.80 -57.5 -55.0 -56.6 67 -99 SPO 1997 10 17 04 52 74 4.7 -9 674.80 -57.5 -55.0 -56.6 67 -99 SPO 1997 10 17 04 53 74 4.7 -9 674.80 -57.6 -55.0 -56.7 67 -99 SPO 1997 10 17 04 54 71 4.7 -9 674.80 -57.6 -54.9 -56.8 67 -99 SPO 1997 10 17 04 55 71 4.5 -9 674.80 -57.6 -55.0 -56.8 67 -99 SPO 1997 10 17 04 56 72 4.8 -9 674.80 -57.7 -55.0 -56.8 67 -99 SPO 1997 10 17 04 57 71 4.8 -9 674.80 -57.7 -54.8 -56.8 67 -99 SPO 1997 10 17 04 58 74 5.1 -9 674.80 -57.7 -54.9 -56.8 67 -99 SPO 1997 10 17 04 59 72 4.7 -9 674.80 -57.7 -54.9 -56.9 67 -99 SPO 1997 10 17 05 00 73 4.5 -9 674.80 -57.7 -54.8 -56.9 67 0 SPO 1997 10 17 05 01 76 4.7 -9 674.80 -57.8 -55.0 -56.9 68 -99 SPO 1997 10 17 05 02 74 4.5 -9 674.80 -57.8 -55.0 -56.9 67 -99 SPO 1997 10 17 05 03 76 4.4 -9 674.80 -57.9 -55.1 -56.9 67 -99 SPO 1997 10 17 05 04 76 4.3 -9 674.80 -57.9 -55.2 -56.9 67 -99 SPO 1997 10 17 05 05 78 4.5 -9 674.80 -57.9 -55.2 -56.9 66 -99 SPO 1997 10 17 05 06 78 4.4 -9 674.80 -57.9 -55.1 -56.9 65 -99 SPO 1997 10 17 05 07 79 4.3 -9 674.80 -57.9 -55.2 -56.9 65 -99 SPO 1997 10 17 05 08 80 4.3 -9 674.80 -57.9 -55.2 -56.9 65 -99 SPO 1997 10 17 05 09 81 4.2 -9 674.80 -58.0 -55.2 -56.9 66 -99 SPO 1997 10 17 05 10 81 4.1 -9 674.80 -58.0 -55.2 -56.9 66 -99 SPO 1997 10 17 05 11 82 4.2 -9 674.80 -58.0 -55.1 -56.9 66 -99 SPO 1997 10 17 05 12 82 4.3 -9 674.80 -58.0 -55.1 -56.9 66 -99 SPO 1997 10 17 05 13 82 4.4 -9 674.80 -58.0 -55.1 -56.9 66 -99 SPO 1997 10 17 05 14 81 4.3 -9 674.80 -58.0 -55.2 -56.9 66 -99 SPO 1997 10 17 05 15 82 4.2 -9 674.80 -58.0 -55.2 -57.0 66 -99 SPO 1997 10 17 05 16 82 4.2 -9 674.80 -58.1 -55.3 -57.0 67 -99 SPO 1997 10 17 05 17 83 4.2 -9 674.80 -58.2 -55.3 -57.0 67 -99 SPO 1997 10 17 05 18 82 4.3 -9 674.70 -58.2 -55.3 -57.0 65 -99 SPO 1997 10 17 05 19 82 4.4 -9 674.70 -58.2 -55.3 -57.1 64 -99 SPO 1997 10 17 05 20 81 4.5 -9 674.70 -58.1 -55.3 -57.1 63 -99 SPO 1997 10 17 05 21 81 4.7 -9 674.70 -58.1 -55.4 -57.1 64 -99 SPO 1997 10 17 05 22 81 4.5 -9 674.70 -58.1 -55.4 -57.1 64 -99 SPO 1997 10 17 05 23 79 4.4 -9 674.70 -58.1 -55.5 -57.2 66 -99 SPO 1997 10 17 05 24 79 4.4 -9 674.70 -58.1 -55.4 -57.2 66 -99 SPO 1997 10 17 05 25 79 4.5 -9 674.70 -58.2 -55.4 -57.2 66 -99 SPO 1997 10 17 05 26 78 4.4 -9 674.70 -58.2 -55.5 -57.2 65 -99 SPO 1997 10 17 05 27 78 4.4 -9 674.70 -58.3 -55.5 -57.3 65 -99 SPO 1997 10 17 05 28 79 4.3 -9 674.70 -58.2 -55.5 -57.3 64 -99 SPO 1997 10 17 05 29 79 4.3 -9 674.70 -58.2 -55.6 -57.2 63 -99 SPO 1997 10 17 05 30 80 4.2 -9 674.70 -58.2 -55.6 -57.2 63 -99 SPO 1997 10 17 05 31 81 4.2 -9 674.70 -58.1 -55.7 -57.2 62 -99 SPO 1997 10 17 05 32 83 4.1 -9 674.80 -58.0 -55.7 -57.1 62 -99 SPO 1997 10 17 05 33 85 4.1 -9 674.80 -58.0 -55.7 -57.1 62 -99 SPO 1997 10 17 05 34 87 4.0 -9 674.80 -57.9 -55.7 -57.0 62 -99 SPO 1997 10 17 05 35 88 4.0 -9 674.80 -57.9 -55.7 -57.0 64 -99 SPO 1997 10 17 05 36 88 4.0 -9 674.80 -57.8 -55.8 -57.0 64 -99 SPO 1997 10 17 05 37 88 4.0 -9 674.80 -57.8 -55.7 -57.0 65 -99 SPO 1997 10 17 05 38 86 4.1 -9 674.80 -57.7 -55.7 -56.9 64 -99 SPO 1997 10 17 05 39 85 4.2 -9 674.80 -57.7 -55.6 -56.8 65 -99 SPO 1997 10 17 05 40 83 4.4 -9 674.80 -57.6 -55.5 -56.9 64 -99 SPO 1997 10 17 05 41 80 4.6 -9 674.80 -57.6 -55.4 -56.8 65 -99 SPO 1997 10 17 05 42 79 4.6 -9 674.80 -57.5 -55.4 -56.8 63 -99 SPO 1997 10 17 05 43 78 4.6 -9 674.80 -57.5 -55.4 -56.8 63 -99 SPO 1997 10 17 05 44 78 4.8 -9 674.80 -57.5 -55.3 -56.8 63 -99 SPO 1997 10 17 05 45 77 4.9 -9 674.80 -57.5 -55.2 -56.8 63 -99 SPO 1997 10 17 05 46 77 4.8 -9 674.80 -57.4 -55.1 -56.8 63 -99 SPO 1997 10 17 05 47 78 4.9 -9 674.80 -57.4 -55.0 -56.8 63 -99 SPO 1997 10 17 05 48 78 4.9 -9 674.80 -57.4 -55.0 -56.8 64 -99 SPO 1997 10 17 05 49 78 4.7 -9 674.80 -57.4 -54.9 -56.8 65 -99 SPO 1997 10 17 05 50 79 4.6 -9 674.80 -57.4 -54.9 -56.8 65 -99 SPO 1997 10 17 05 51 79 4.7 -9 674.80 -57.5 -54.8 -56.8 66 -99 SPO 1997 10 17 05 52 78 4.7 -9 674.80 -57.5 -54.8 -56.8 66 -99 SPO 1997 10 17 05 53 77 4.8 -9 674.80 -57.5 -54.7 -56.8 66 -99 SPO 1997 10 17 05 54 76 5.0 -9 674.70 -57.4 -54.6 -56.8 65 -99 SPO 1997 10 17 05 55 75 5.2 -9 674.70 -57.4 -54.6 -56.8 65 -99 SPO 1997 10 17 05 56 74 5.2 -9 674.70 -57.4 -54.6 -56.8 64 -99 SPO 1997 10 17 05 57 73 5.3 -9 674.70 -57.3 -54.5 -56.8 63 -99 SPO 1997 10 17 05 58 72 5.3 -9 674.70 -57.3 -54.4 -56.8 63 -99 SPO 1997 10 17 05 59 72 5.4 -9 674.70 -57.2 -54.4 -56.8 63 -99 SPO 1997 10 17 06 00 71 5.5 -9 674.70 -57.1 -54.4 -56.7 63 0 SPO 1997 10 17 06 01 70 5.4 -9 674.70 -57.0 -54.3 -56.7 63 -99 SPO 1997 10 17 06 02 69 5.5 -9 674.70 -57.0 -54.3 -56.7 63 -99 SPO 1997 10 17 06 03 67 5.5 -9 674.60 -57.0 -54.2 -56.6 65 -99 SPO 1997 10 17 06 04 66 5.6 -9 674.60 -57.0 -54.2 -56.6 65 -99 SPO 1997 10 17 06 05 66 5.7 -9 674.60 -56.9 -54.2 -56.6 65 -99 SPO 1997 10 17 06 06 64 5.6 -9 674.60 -56.8 -54.1 -56.5 65 -99 SPO 1997 10 17 06 07 64 5.5 -9 674.60 -56.8 -54.1 -56.4 64 -99 SPO 1997 10 17 06 08 63 5.6 -9 674.60 -56.7 -54.0 -56.4 64 -99 SPO 1997 10 17 06 09 64 5.7 -9 674.60 -56.6 -54.0 -56.3 63 -99 SPO 1997 10 17 06 10 63 5.9 -9 674.60 -56.5 -53.9 -56.3 62 -99 SPO 1997 10 17 06 11 63 6.0 -9 674.60 -56.4 -53.9 -56.2 63 -99 SPO 1997 10 17 06 12 62 6.0 -9 674.60 -56.4 -53.9 -56.1 64 -99 SPO 1997 10 17 06 13 62 6.0 -9 674.60 -56.3 -53.8 -56.0 64 -99 SPO 1997 10 17 06 14 61 6.2 -9 674.60 -56.2 -53.8 -56.0 64 -99 SPO 1997 10 17 06 15 60 6.4 -9 674.60 -56.1 -53.7 -55.8 64 -99 SPO 1997 10 17 06 16 59 6.6 -9 674.60 -56.0 -53.6 -55.8 63 -99 SPO 1997 10 17 06 17 59 6.8 -9 674.50 -55.9 -53.5 -55.7 64 -99 SPO 1997 10 17 06 18 58 6.9 -9 674.50 -55.8 -53.4 -55.6 64 -99 SPO 1997 10 17 06 19 57 7.0 -9 674.50 -55.8 -53.3 -55.6 65 -99 SPO 1997 10 17 06 20 57 7.0 -9 674.50 -55.8 -53.3 -55.5 65 -99 SPO 1997 10 17 06 21 56 7.1 -9 674.50 -55.7 -53.2 -55.4 65 -99 SPO 1997 10 17 06 22 55 7.3 -9 674.50 -55.6 -53.1 -55.2 65 -99 SPO 1997 10 17 06 23 54 7.3 -9 674.50 -55.4 -53.0 -55.2 65 -99 SPO 1997 10 17 06 24 53 7.3 -9 674.50 -55.4 -52.9 -55.1 65 -99 SPO 1997 10 17 06 25 53 7.4 -9 674.50 -55.3 -52.8 -55.0 66 -99 SPO 1997 10 17 06 26 53 7.4 -9 674.50 -55.2 -52.8 -55.0 66 -99 SPO 1997 10 17 06 27 54 7.2 -9 674.50 -55.2 -52.8 -54.9 67 -99 SPO 1997 10 17 06 28 55 6.9 -9 674.50 -55.2 -52.9 -54.9 67 -99 SPO 1997 10 17 06 29 57 6.9 -9 674.50 -55.2 -53.1 -54.9 68 -99 SPO 1997 10 17 06 30 59 6.8 -9 674.50 -55.2 -53.2 -54.9 68 -99 SPO 1997 10 17 06 31 61 6.6 -9 674.60 -55.2 -53.4 -54.9 67 -99 SPO 1997 10 17 06 32 64 6.1 -9 674.60 -55.3 -53.7 -55.0 68 -99 SPO 1997 10 17 06 33 66 5.8 -9 674.60 -55.4 -53.9 -55.0 68 -99 SPO 1997 10 17 06 34 67 5.7 -9 674.60 -55.4 -54.2 -55.0 67 -99 SPO 1997 10 17 06 35 68 5.7 -9 674.60 -55.6 -54.2 -55.1 69 -99 SPO 1997 10 17 06 36 68 5.6 -9 674.60 -55.7 -54.3 -55.1 69 -99 SPO 1997 10 17 06 37 66 5.7 -9 674.60 -55.7 -54.3 -55.2 69 -99 SPO 1997 10 17 06 38 66 5.8 -9 674.50 -55.8 -54.2 -55.2 70 -99 SPO 1997 10 17 06 39 64 5.9 -9 674.50 -55.8 -54.2 -55.2 69 -99 SPO 1997 10 17 06 40 64 6.1 -9 674.50 -55.7 -54.0 -55.2 68 -99 SPO 1997 10 17 06 41 63 6.4 -9 674.50 -55.6 -53.9 -55.2 67 -99 SPO 1997 10 17 06 42 63 6.3 -9 674.50 -55.6 -53.8 -55.2 67 -99 SPO 1997 10 17 06 43 63 6.3 -9 674.50 -55.6 -53.8 -55.2 66 -99 SPO 1997 10 17 06 44 63 6.2 -9 674.50 -55.6 -53.7 -55.1 66 -99 SPO 1997 10 17 06 45 62 6.3 -9 674.50 -55.6 -53.6 -55.1 65 -99 SPO 1997 10 17 06 46 63 6.4 -9 674.50 -55.5 -53.6 -55.1 65 -99 SPO 1997 10 17 06 47 63 6.4 -9 674.50 -55.4 -53.6 -55.0 64 -99 SPO 1997 10 17 06 48 63 6.5 -9 674.50 -55.4 -53.6 -55.0 64 -99 SPO 1997 10 17 06 49 63 6.3 -9 674.50 -55.4 -53.6 -55.0 65 -99 SPO 1997 10 17 06 50 65 6.1 -9 674.50 -55.5 -53.7 -55.1 66 -99 SPO 1997 10 17 06 51 67 6.0 -9 674.50 -55.6 -53.8 -55.1 67 -99 SPO 1997 10 17 06 52 67 6.0 -9 674.50 -55.7 -53.8 -55.1 68 -99 SPO 1997 10 17 06 53 68 5.9 -9 674.50 -55.6 -53.8 -55.2 67 -99 SPO 1997 10 17 06 54 68 6.0 -9 674.50 -55.8 -53.8 -55.2 69 -99 SPO 1997 10 17 06 55 69 5.8 -9 674.50 -55.8 -53.8 -55.2 67 -99 SPO 1997 10 17 06 56 69 6.0 -9 674.50 -55.9 -53.8 -55.3 68 -99 SPO 1997 10 17 06 57 71 5.9 -9 674.50 -55.9 -53.8 -55.3 67 -99 SPO 1997 10 17 06 58 73 5.8 -9 674.50 -55.9 -53.9 -55.3 66 -99 SPO 1997 10 17 06 59 73 5.9 -9 674.50 -56.0 -53.9 -55.4 67 -99 SPO 1997 10 17 07 00 73 5.8 -9 674.50 -56.1 -53.9 -55.4 68 0 SPO 1997 10 17 07 01 72 5.8 -9 674.50 -56.1 -54.0 -55.4 67 -99 SPO 1997 10 17 07 02 73 5.7 -9 674.50 -56.2 -54.0 -55.6 67 -99 SPO 1997 10 17 07 03 73 5.5 -9 674.50 -56.4 -54.0 -55.6 69 -99 SPO 1997 10 17 07 04 73 5.2 -9 674.40 -56.6 -54.1 -55.7 68 -99 SPO 1997 10 17 07 05 73 5.0 -9 674.40 -56.8 -54.2 -55.8 68 -99 SPO 1997 10 17 07 06 74 5.0 -9 674.40 -57.0 -54.2 -55.9 69 -99 SPO 1997 10 17 07 07 74 5.0 -9 674.40 -57.2 -54.2 -56.0 69 -99 SPO 1997 10 17 07 08 74 5.1 -9 674.40 -57.4 -54.2 -56.1 68 -99 SPO 1997 10 17 07 09 72 5.6 -9 674.40 -57.5 -54.2 -56.2 67 -99 SPO 1997 10 17 07 10 74 5.7 -9 674.40 -57.4 -54.2 -56.2 65 -99 SPO 1997 10 17 07 11 75 5.8 -9 674.40 -57.4 -54.2 -56.2 64 -99 SPO 1997 10 17 07 12 75 5.8 -9 674.40 -57.3 -54.3 -56.2 63 -99 SPO 1997 10 17 07 13 75 5.8 -9 674.40 -57.3 -54.3 -56.1 63 -99 SPO 1997 10 17 07 14 75 5.7 -9 674.40 -57.2 -54.3 -56.2 63 -99 SPO 1997 10 17 07 15 76 5.6 -9 674.40 -57.4 -54.4 -56.2 65 -99 SPO 1997 10 17 07 16 76 5.5 -9 674.40 -57.4 -54.4 -56.2 65 -99 SPO 1997 10 17 07 17 76 5.6 -9 674.40 -57.6 -54.4 -56.3 67 -99 SPO 1997 10 17 07 18 75 5.5 -9 674.40 -57.7 -54.3 -56.4 67 -99 SPO 1997 10 17 07 19 74 5.5 -9 674.40 -57.7 -54.3 -56.4 66 -99 SPO 1997 10 17 07 20 74 5.6 -9 674.40 -57.7 -54.4 -56.4 65 -99 SPO 1997 10 17 07 21 75 5.7 -9 674.40 -57.8 -54.3 -56.4 64 -99 SPO 1997 10 17 07 22 74 5.7 -9 674.40 -57.7 -54.3 -56.4 63 -99 SPO 1997 10 17 07 23 74 5.5 -9 674.40 -57.7 -54.4 -56.4 63 -99 SPO 1997 10 17 07 24 74 5.4 -9 674.40 -57.8 -54.4 -56.4 64 -99 SPO 1997 10 17 07 25 73 5.4 -9 674.40 -57.8 -54.4 -56.5 64 -99 SPO 1997 10 17 07 26 72 5.5 -9 674.40 -57.9 -54.4 -56.5 65 -99 SPO 1997 10 17 07 27 71 5.7 -9 674.40 -57.9 -54.4 -56.6 64 -99 SPO 1997 10 17 07 28 70 5.7 -9 674.40 -58.0 -54.4 -56.6 65 -99 SPO 1997 10 17 07 29 69 5.6 -9 674.40 -58.0 -54.4 -56.7 65 -99 SPO 1997 10 17 07 30 69 5.7 -9 674.40 -58.0 -54.3 -56.8 63 -99 SPO 1997 10 17 07 31 69 5.8 -9 674.40 -58.0 -54.3 -56.9 63 -99 SPO 1997 10 17 07 32 69 5.8 -9 674.40 -58.0 -54.3 -56.9 63 -99 SPO 1997 10 17 07 33 68 5.8 -9 674.40 -57.8 -54.3 -56.9 62 -99 SPO 1997 10 17 07 34 69 5.7 -9 674.40 -57.8 -54.3 -56.8 62 -99 SPO 1997 10 17 07 35 70 5.7 -9 674.30 -57.7 -54.3 -56.7 61 -99 SPO 1997 10 17 07 36 70 5.6 -9 674.40 -57.6 -54.3 -56.7 62 -99 SPO 1997 10 17 07 37 70 5.5 -9 674.40 -57.6 -54.3 -56.6 62 -99 SPO 1997 10 17 07 38 73 5.3 -9 674.40 -57.6 -54.4 -56.4 63 -99 SPO 1997 10 17 07 39 75 5.1 -9 674.40 -57.6 -54.6 -56.3 63 -99 SPO 1997 10 17 07 40 77 4.8 -9 674.40 -57.7 -54.6 -56.3 65 -99 SPO 1997 10 17 07 41 78 4.6 -9 674.40 -57.8 -54.7 -56.4 66 -99 SPO 1997 10 17 07 42 80 4.5 -9 674.40 -58.0 -54.7 -56.4 67 -99 SPO 1997 10 17 07 43 81 4.5 -9 674.40 -58.0 -54.7 -56.4 66 -99 SPO 1997 10 17 07 44 83 4.4 -9 674.40 -58.2 -54.8 -56.4 67 -99 SPO 1997 10 17 07 45 86 4.3 -9 674.40 -58.2 -54.8 -56.4 66 -99 SPO 1997 10 17 07 46 89 4.2 -9 674.40 -58.3 -54.8 -56.4 66 -99 SPO 1997 10 17 07 47 90 4.2 -9 674.40 -58.4 -54.8 -56.5 66 -99 SPO 1997 10 17 07 48 91 4.5 -9 674.40 -58.4 -54.8 -56.6 65 -99 SPO 1997 10 17 07 49 91 4.7 -9 674.40 -58.4 -54.9 -56.6 64 -99 SPO 1997 10 17 07 50 91 4.8 -9 674.40 -58.4 -54.9 -56.6 64 -99 SPO 1997 10 17 07 51 93 4.6 -9 674.40 -58.3 -54.9 -56.6 64 -99 SPO 1997 10 17 07 52 96 4.3 -9 674.40 -58.3 -55.0 -56.6 65 -99 SPO 1997 10 17 07 53 98 4.4 -9 674.40 -58.4 -55.0 -56.6 65 -99 SPO 1997 10 17 07 54 98 4.5 -9 674.40 -58.4 -55.0 -56.7 65 -99 SPO 1997 10 17 07 55 97 4.5 -9 674.40 -58.3 -55.0 -56.7 64 -99 SPO 1997 10 17 07 56 94 4.7 -9 674.40 -58.2 -55.0 -56.6 64 -99 SPO 1997 10 17 07 57 92 4.7 -9 674.40 -58.1 -54.9 -56.5 63 -99 SPO 1997 10 17 07 58 90 4.8 -9 674.40 -58.0 -54.8 -56.4 63 -99 SPO 1997 10 17 07 59 88 4.7 -9 674.40 -58.0 -54.8 -56.4 63 -99 SPO 1997 10 17 08 00 87 4.7 -9 674.40 -57.9 -54.9 -56.3 64 0 SPO 1997 10 17 08 01 88 4.7 -9 674.40 -57.9 -54.7 -56.3 64 -99 SPO 1997 10 17 08 02 90 4.3 -9 674.40 -57.9 -54.8 -56.2 65 -99 SPO 1997 10 17 08 03 92 4.0 -9 674.40 -57.9 -55.0 -56.2 66 -99 SPO 1997 10 17 08 04 92 4.0 -9 674.40 -58.0 -55.0 -56.2 66 -99 SPO 1997 10 17 08 05 90 4.0 -9 674.40 -58.1 -55.1 -56.1 67 -99 SPO 1997 10 17 08 06 91 4.0 -9 674.40 -58.1 -55.1 -56.1 66 -99 SPO 1997 10 17 08 07 90 4.0 -9 674.30 -58.1 -55.1 -56.1 66 -99 SPO 1997 10 17 08 08 91 4.2 -9 674.30 -58.0 -55.1 -56.1 66 -99 SPO 1997 10 17 08 09 91 4.2 -9 674.30 -58.0 -55.1 -56.1 66 -99 SPO 1997 10 17 08 10 92 4.3 -9 674.30 -57.9 -55.1 -56.0 66 -99 SPO 1997 10 17 08 11 92 4.4 -9 674.30 -57.9 -55.0 -56.0 66 -99 SPO 1997 10 17 08 12 91 4.4 -9 674.30 -57.9 -55.0 -56.0 66 -99 SPO 1997 10 17 08 13 90 4.5 -9 674.30 -57.9 -55.1 -56.0 66 -99 SPO 1997 10 17 08 14 87 4.6 -9 674.30 -57.8 -55.2 -56.1 64 -99 SPO 1997 10 17 08 15 86 4.5 -9 674.30 -57.8 -55.2 -56.0 65 -99 SPO 1997 10 17 08 16 86 4.5 -9 674.30 -57.7 -55.2 -56.0 65 -99 SPO 1997 10 17 08 17 86 4.5 -9 674.30 -57.8 -55.2 -56.0 66 -99 SPO 1997 10 17 08 18 87 4.4 -9 674.30 -57.8 -55.2 -56.0 67 -99 SPO 1997 10 17 08 19 87 4.5 -9 674.20 -57.8 -55.2 -56.0 67 -99 SPO 1997 10 17 08 20 86 4.5 -9 674.20 -57.8 -55.2 -56.0 67 -99 SPO 1997 10 17 08 21 85 4.4 -9 674.20 -57.9 -55.2 -56.0 67 -99 SPO 1997 10 17 08 22 85 4.4 -9 674.20 -57.9 -55.1 -56.1 67 -99 SPO 1997 10 17 08 23 84 4.3 -9 674.20 -58.0 -55.0 -56.1 67 -99 SPO 1997 10 17 08 24 83 4.4 -9 674.20 -58.0 -54.9 -56.1 67 -99 SPO 1997 10 17 08 25 82 4.5 -9 674.20 -58.1 -54.8 -56.1 67 -99 SPO 1997 10 17 08 26 81 4.8 -9 674.20 -58.1 -54.7 -56.2 66 -99 SPO 1997 10 17 08 27 80 4.9 -9 674.20 -58.1 -54.6 -56.2 66 -99 SPO 1997 10 17 08 28 79 5.2 -9 674.10 -58.1 -54.6 -56.3 66 -99 SPO 1997 10 17 08 29 78 5.3 -9 674.10 -58.0 -54.5 -56.3 65 -99 SPO 1997 10 17 08 30 78 5.3 -9 674.10 -57.9 -54.5 -56.3 65 -99 SPO 1997 10 17 08 31 78 5.2 -9 674.10 -57.9 -54.6 -56.3 66 -99 SPO 1997 10 17 08 32 77 5.1 -9 674.10 -57.8 -54.6 -56.3 65 -99 SPO 1997 10 17 08 33 78 4.9 -9 674.10 -57.8 -54.6 -56.3 67 -99 SPO 1997 10 17 08 34 79 4.6 -9 674.10 -57.8 -54.6 -56.2 67 -99 SPO 1997 10 17 08 35 79 4.4 -9 674.10 -57.9 -54.7 -56.2 67 -99 SPO 1997 10 17 08 36 80 4.1 -9 674.10 -58.0 -54.8 -56.2 68 -99 SPO 1997 10 17 08 37 80 4.0 -9 674.10 -58.0 -54.8 -56.1 67 -99 SPO 1997 10 17 08 38 80 3.9 -9 674.10 -58.0 -54.8 -56.1 66 -99 SPO 1997 10 17 08 39 79 3.8 -9 674.10 -58.0 -54.9 -56.1 66 -99 SPO 1997 10 17 08 40 78 3.5 -9 674.10 -58.1 -54.8 -56.2 66 -99 SPO 1997 10 17 08 41 77 3.5 -9 674.10 -58.2 -54.8 -56.2 67 -99 SPO 1997 10 17 08 42 75 3.4 -9 674.10 -58.3 -54.8 -56.3 68 -99 SPO 1997 10 17 08 43 73 3.5 -9 674.10 -58.3 -54.7 -56.3 69 -99 SPO 1997 10 17 08 44 73 3.6 -9 674.10 -58.3 -54.6 -56.4 68 -99 SPO 1997 10 17 08 45 73 3.8 -9 674.10 -58.3 -54.5 -56.4 69 -99 SPO 1997 10 17 08 46 72 3.9 -9 674.10 -58.3 -54.5 -56.5 69 -99 SPO 1997 10 17 08 47 72 4.0 -9 674.10 -58.2 -54.5 -56.5 67 -99 SPO 1997 10 17 08 48 72 4.1 -9 674.10 -58.2 -54.5 -56.5 67 -99 SPO 1997 10 17 08 49 73 4.2 -9 674.10 -58.0 -54.5 -56.5 66 -99 SPO 1997 10 17 08 50 74 4.3 -9 674.10 -58.0 -54.6 -56.4 66 -99 SPO 1997 10 17 08 51 74 4.4 -9 674.10 -57.9 -54.6 -56.4 67 -99 SPO 1997 10 17 08 52 75 4.5 -9 674.00 -57.8 -54.6 -56.3 66 -99 SPO 1997 10 17 08 53 76 4.8 -9 674.00 -57.8 -54.6 -56.4 66 -99 SPO 1997 10 17 08 54 76 5.0 -9 674.00 -57.7 -54.6 -56.3 65 -99 SPO 1997 10 17 08 55 75 5.0 -9 674.00 -57.7 -54.6 -56.4 66 -99 SPO 1997 10 17 08 56 75 5.2 -9 674.00 -57.6 -54.5 -56.3 65 -99 SPO 1997 10 17 08 57 76 5.1 -9 674.00 -57.6 -54.4 -56.3 67 -99 SPO 1997 10 17 08 58 79 5.0 -9 674.00 -57.6 -54.4 -56.3 67 -99 SPO 1997 10 17 08 59 80 5.0 -9 674.00 -57.7 -54.4 -56.3 67 -99 SPO 1997 10 17 09 00 83 4.8 -9 674.00 -57.8 -54.3 -56.4 68 0 SPO 1997 10 17 09 01 84 4.7 -9 674.00 -57.8 -54.4 -56.4 67 -99 SPO 1997 10 17 09 02 86 4.8 -9 674.00 -57.8 -54.5 -56.4 67 -99 SPO 1997 10 17 09 03 85 4.9 -9 674.00 -57.9 -54.5 -56.5 67 -99 SPO 1997 10 17 09 04 82 4.8 -9 674.00 -57.9 -54.4 -56.5 66 -99 SPO 1997 10 17 09 05 84 4.8 -9 674.00 -57.9 -54.5 -56.4 65 -99 SPO 1997 10 17 09 06 85 4.8 -9 674.00 -58.0 -54.4 -56.5 66 -99 SPO 1997 10 17 09 07 82 4.7 -9 674.00 -58.1 -54.5 -56.5 66 -99 SPO 1997 10 17 09 08 83 4.6 -9 674.00 -58.0 -54.6 -56.5 66 -99 SPO 1997 10 17 09 09 84 4.7 -9 674.00 -58.2 -54.6 -56.5 67 -99 SPO 1997 10 17 09 10 86 4.7 -9 674.00 -58.2 -54.6 -56.6 67 -99 SPO 1997 10 17 09 11 86 4.7 -9 674.00 -58.3 -54.6 -56.6 68 -99 SPO 1997 10 17 09 12 85 4.7 -9 674.00 -58.3 -54.7 -56.6 67 -99 SPO 1997 10 17 09 13 84 5.0 -9 674.00 -58.3 -54.6 -56.5 67 -99 SPO 1997 10 17 09 14 82 5.1 -9 674.00 -58.3 -54.5 -56.6 66 -99 SPO 1997 10 17 09 15 81 5.1 -9 674.00 -58.3 -54.5 -56.7 66 -99 SPO 1997 10 17 09 16 81 5.1 -9 674.00 -58.3 -54.5 -56.7 65 -99 SPO 1997 10 17 09 17 80 5.2 -9 673.90 -58.3 -54.4 -56.7 65 -99 SPO 1997 10 17 09 18 80 5.3 -9 673.90 -58.3 -54.4 -56.8 65 -99 SPO 1997 10 17 09 19 80 5.4 -9 673.90 -58.2 -54.4 -56.8 64 -99 SPO 1997 10 17 09 20 78 5.5 -9 673.90 -58.2 -54.3 -56.8 64 -99 SPO 1997 10 17 09 21 77 5.5 -9 673.90 -58.2 -54.2 -56.9 64 -99 SPO 1997 10 17 09 22 77 5.6 -9 673.90 -58.1 -54.2 -56.9 64 -99 SPO 1997 10 17 09 23 77 5.6 -9 673.90 -58.1 -54.2 -56.9 64 -99 SPO 1997 10 17 09 24 78 5.5 -9 673.90 -58.1 -54.3 -56.8 66 -99 SPO 1997 10 17 09 25 80 5.5 -9 673.90 -58.1 -54.2 -56.8 66 -99 SPO 1997 10 17 09 26 82 5.4 -9 673.80 -58.1 -54.2 -56.8 66 -99 SPO 1997 10 17 09 27 83 5.3 -9 673.90 -58.2 -54.2 -56.7 66 -99 SPO 1997 10 17 09 28 84 5.2 -9 673.90 -58.1 -54.3 -56.7 66 -99 SPO 1997 10 17 09 29 84 5.2 -9 673.90 -58.1 -54.2 -56.6 64 -99 SPO 1997 10 17 09 30 84 5.1 -9 673.90 -58.1 -54.2 -56.6 64 -99 SPO 1997 10 17 09 31 84 5.0 -9 673.90 -58.1 -54.3 -56.6 64 -99 SPO 1997 10 17 09 32 82 5.1 -9 673.90 -58.1 -54.3 -56.6 64 -99 SPO 1997 10 17 09 33 81 5.0 -9 673.90 -58.1 -54.3 -56.6 66 -99 SPO 1997 10 17 09 34 80 4.9 -9 673.90 -58.0 -54.4 -56.5 65 -99 SPO 1997 10 17 09 35 80 4.8 -9 673.90 -58.0 -54.4 -56.5 66 -99 SPO 1997 10 17 09 36 78 4.6 -9 673.90 -58.0 -54.4 -56.5 66 -99 SPO 1997 10 17 09 37 77 4.5 -9 673.90 -57.9 -54.4 -56.5 66 -99 SPO 1997 10 17 09 38 77 4.5 -9 673.90 -57.8 -54.5 -56.4 65 -99 SPO 1997 10 17 09 39 78 4.5 -9 673.90 -57.7 -54.5 -56.4 66 -99 SPO 1997 10 17 09 40 77 4.4 -9 673.90 -57.7 -54.6 -56.3 67 -99 SPO 1997 10 17 09 41 80 4.5 -9 673.90 -57.7 -54.6 -56.3 67 -99 SPO 1997 10 17 09 42 80 4.6 -9 673.90 -57.8 -54.5 -56.2 67 -99 SPO 1997 10 17 09 43 80 4.6 -9 673.90 -57.8 -54.5 -56.2 67 -99 SPO 1997 10 17 09 44 80 4.6 -9 673.90 -57.8 -54.5 -56.1 67 -99 SPO 1997 10 17 09 45 81 4.7 -9 673.90 -57.8 -54.4 -56.1 67 -99 SPO 1997 10 17 09 46 82 4.9 -9 673.80 -57.9 -54.4 -56.1 68 -99 SPO 1997 10 17 09 47 83 4.9 -9 673.80 -57.8 -54.3 -56.1 67 -99 SPO 1997 10 17 09 48 83 4.7 -9 673.80 -57.8 -54.3 -56.1 67 -99 SPO 1997 10 17 09 49 83 4.7 -9 673.80 -57.8 -54.3 -56.0 67 -99 SPO 1997 10 17 09 50 84 4.9 -9 673.80 -57.8 -54.3 -56.0 67 -99 SPO 1997 10 17 09 51 83 4.9 -9 673.80 -57.9 -54.3 -56.1 68 -99 SPO 1997 10 17 09 52 84 4.9 -9 673.80 -57.8 -54.3 -56.1 67 -99 SPO 1997 10 17 09 53 84 4.9 -9 673.80 -57.8 -54.3 -56.2 67 -99 SPO 1997 10 17 09 54 84 5.1 -9 673.80 -57.8 -54.4 -56.2 67 -99 SPO 1997 10 17 09 55 83 5.1 -9 673.80 -57.8 -54.3 -56.2 67 -99 SPO 1997 10 17 09 56 83 5.4 -9 673.70 -57.9 -54.3 -56.3 67 -99 SPO 1997 10 17 09 57 82 5.2 -9 673.70 -57.9 -54.3 -56.4 67 -99 SPO 1997 10 17 09 58 81 5.4 -9 673.70 -57.9 -54.4 -56.5 67 -99 SPO 1997 10 17 09 59 81 5.3 -9 673.70 -57.9 -54.3 -56.5 67 -99 SPO 1997 10 17 10 00 81 5.0 -9 673.70 -57.9 -54.4 -56.5 67 0 SPO 1997 10 17 10 01 83 5.0 -9 673.70 -58.0 -54.6 -56.5 68 -99 SPO 1997 10 17 10 02 85 5.2 -9 673.70 -58.0 -54.5 -56.5 68 -99 SPO 1997 10 17 10 03 85 5.2 -9 673.70 -58.0 -54.5 -56.6 67 -99 SPO 1997 10 17 10 04 84 5.2 -9 673.70 -58.0 -54.5 -56.6 67 -99 SPO 1997 10 17 10 05 84 5.2 -9 673.70 -58.1 -54.4 -56.7 67 -99 SPO 1997 10 17 10 06 84 5.4 -9 673.70 -58.1 -54.4 -56.7 66 -99 SPO 1997 10 17 10 07 83 5.3 -9 673.70 -58.1 -54.4 -56.7 66 -99 SPO 1997 10 17 10 08 83 5.3 -9 673.70 -58.1 -54.4 -56.7 66 -99 SPO 1997 10 17 10 09 83 5.4 -9 673.70 -58.1 -54.3 -56.8 66 -99 SPO 1997 10 17 10 10 83 5.3 -9 673.70 -58.1 -54.3 -56.8 64 -99 SPO 1997 10 17 10 11 83 5.7 -9 673.70 -58.1 -54.3 -56.8 66 -99 SPO 1997 10 17 10 12 83 5.8 -9 673.70 -58.0 -54.0 -56.8 65 -99 SPO 1997 10 17 10 13 82 5.5 -9 673.70 -58.0 -54.2 -56.7 65 -99 SPO 1997 10 17 10 14 84 5.6 -9 673.70 -57.9 -54.2 -56.7 65 -99 SPO 1997 10 17 10 15 83 5.4 -9 673.70 -57.8 -54.2 -56.6 65 -99 SPO 1997 10 17 10 16 86 5.4 -9 673.70 -57.8 -54.2 -56.6 66 -99 SPO 1997 10 17 10 17 88 5.4 -9 673.70 -57.8 -54.2 -56.6 66 -99 SPO 1997 10 17 10 18 90 5.4 -9 673.70 -57.9 -54.3 -56.6 67 -99 SPO 1997 10 17 10 19 91 5.1 -9 673.70 -58.0 -54.4 -56.6 66 -99 SPO 1997 10 17 10 20 92 5.1 -9 673.80 -58.0 -54.6 -56.6 66 -99 SPO 1997 10 17 10 21 93 5.2 -9 673.80 -57.9 -54.7 -56.6 65 -99 SPO 1997 10 17 10 22 92 5.1 -9 673.80 -57.8 -54.7 -56.6 64 -99 SPO 1997 10 17 10 23 91 5.0 -9 673.80 -57.8 -54.7 -56.6 65 -99 SPO 1997 10 17 10 24 89 5.0 -9 673.80 -57.8 -54.6 -56.5 66 -99 SPO 1997 10 17 10 25 89 4.7 -9 673.80 -57.7 -54.7 -56.5 65 -99 SPO 1997 10 17 10 26 89 4.5 -9 673.80 -57.7 -54.8 -56.4 66 -99 SPO 1997 10 17 10 27 89 4.4 -9 673.80 -57.7 -55.0 -56.4 66 -99 SPO 1997 10 17 10 28 89 4.3 -9 673.70 -57.7 -55.1 -56.3 66 -99 SPO 1997 10 17 10 29 88 4.0 -9 673.80 -57.7 -55.2 -56.2 66 -99 SPO 1997 10 17 10 30 88 3.8 -9 673.80 -57.7 -55.3 -56.1 66 -99 SPO 1997 10 17 10 31 86 3.7 -9 673.80 -57.7 -55.5 -56.0 66 -99 SPO 1997 10 17 10 32 84 3.3 -9 673.70 -57.7 -55.4 -56.0 66 -99 SPO 1997 10 17 10 33 80 2.8 -9 673.70 -57.8 -55.4 -55.8 67 -99 SPO 1997 10 17 10 34 77 2.4 -9 673.80 -57.8 -55.5 -55.8 67 -99 SPO 1997 10 17 10 35 75 1.9 -9 673.80 -57.8 -55.7 -55.6 68 -99 SPO 1997 10 17 10 36 74 1.5 -9 673.80 -57.8 -55.8 -55.4 69 -99 SPO 1997 10 17 10 37 67 1.0 -9 673.80 -57.7 -56.1 -55.2 69 -99 SPO 1997 10 17 10 38 70 1.4 -9 673.80 -57.6 -56.4 -54.8 70 -99 SPO 1997 10 17 10 39 68 1.2 -9 673.80 -57.6 -56.5 -54.4 71 -99 SPO 1997 10 17 10 40 73 1.3 -9 673.80 -57.5 -56.5 -54.4 71 -99 SPO 1997 10 17 10 41 77 1.7 -9 673.80 -57.5 -56.6 -54.2 72 -99 SPO 1997 10 17 10 42 78 1.5 -9 673.80 -57.5 -56.6 -54.1 73 -99 SPO 1997 10 17 10 43 77 2.0 -9 673.80 -57.4 -56.6 -54.2 73 -99 SPO 1997 10 17 10 44 76 2.1 -9 673.80 -57.4 -56.5 -54.3 73 -99 SPO 1997 10 17 10 45 76 2.2 -9 673.80 -57.4 -56.5 -54.4 73 -99 SPO 1997 10 17 10 46 78 2.2 -9 673.80 -57.4 -56.4 -54.5 72 -99 SPO 1997 10 17 10 47 77 2.4 -9 673.70 -57.4 -56.4 -54.6 71 -99 SPO 1997 10 17 10 48 73 2.5 -9 673.70 -57.4 -56.3 -54.8 70 -99 SPO 1997 10 17 10 49 68 2.4 -9 673.70 -57.5 -56.2 -55.0 71 -99 SPO 1997 10 17 10 50 64 2.5 -9 673.70 -57.5 -56.2 -55.2 71 -99 SPO 1997 10 17 10 51 62 2.6 -9 673.70 -57.5 -56.2 -55.2 72 -99 SPO 1997 10 17 10 52 66 2.2 -9 673.70 -57.5 -56.2 -55.2 73 -99 SPO 1997 10 17 10 53 66 2.4 -9 673.70 -57.6 -56.3 -55.3 74 -99 SPO 1997 10 17 10 54 66 2.2 -9 673.70 -57.6 -56.3 -55.2 73 -99 SPO 1997 10 17 10 55 65 2.0 -9 673.70 -57.7 -56.3 -55.2 74 -99 SPO 1997 10 17 10 56 68 2.1 -9 673.70 -57.6 -56.4 -55.0 73 -99 SPO 1997 10 17 10 57 67 1.4 -9 673.80 -57.6 -56.5 -54.9 73 -99 SPO 1997 10 17 10 58 68 1.5 -9 673.80 -57.7 -56.6 -54.7 74 -99 SPO 1997 10 17 10 59 65 1.3 -9 673.80 -57.6 -56.7 -54.4 73 -99 SPO 1997 10 17 11 00 64 1.0 -9 673.80 -57.6 -56.8 -54.3 73 0 SPO 1997 10 17 11 01 60 1.3 -9 673.80 -57.6 -56.8 -53.9 73 -99 SPO 1997 10 17 11 02 70 1.3 -9 673.70 -57.4 -56.8 -53.7 72 -99 SPO 1997 10 17 11 03 61 1.3 -9 673.70 -57.5 -56.8 -54.0 73 -99 SPO 1997 10 17 11 04 71 1.6 -9 673.70 -57.5 -56.8 -54.0 74 -99 SPO 1997 10 17 11 05 70 1.8 -9 673.70 -57.5 -56.8 -54.2 74 -99 SPO 1997 10 17 11 06 76 1.8 -9 673.70 -57.5 -56.7 -54.4 74 -99 SPO 1997 10 17 11 07 72 2.1 -9 673.70 -57.5 -56.6 -54.6 74 -99 SPO 1997 10 17 11 08 81 2.4 -9 673.70 -57.5 -56.4 -54.8 73 -99 SPO 1997 10 17 11 09 79 2.8 -9 673.60 -57.6 -56.3 -54.9 74 -99 SPO 1997 10 17 11 10 81 2.7 -9 673.60 -57.6 -56.2 -55.0 73 -99 SPO 1997 10 17 11 11 81 2.9 -9 673.60 -57.7 -56.0 -55.2 74 -99 SPO 1997 10 17 11 12 80 2.9 -9 673.60 -57.7 -55.9 -55.3 73 -99 SPO 1997 10 17 11 13 79 2.9 -9 673.60 -57.8 -55.9 -55.4 73 -99 SPO 1997 10 17 11 14 81 2.9 -9 673.60 -57.8 -55.9 -55.4 72 -99 SPO 1997 10 17 11 15 82 3.0 -9 673.60 -57.8 -55.8 -55.4 70 -99 SPO 1997 10 17 11 16 83 3.0 -9 673.60 -57.8 -55.8 -55.5 69 -99 SPO 1997 10 17 11 17 80 2.9 -9 673.60 -57.9 -55.7 -55.6 69 -99 SPO 1997 10 17 11 18 80 2.8 -9 673.60 -58.0 -55.8 -55.6 70 -99 SPO 1997 10 17 11 19 80 2.6 -9 673.60 -58.1 -55.8 -55.7 70 -99 SPO 1997 10 17 11 20 82 2.5 -9 673.60 -58.1 -55.9 -55.8 70 -99 SPO 1997 10 17 11 21 79 2.5 -9 673.60 -58.2 -55.9 -55.8 71 -99 SPO 1997 10 17 11 22 80 2.2 -9 673.60 -58.2 -56.1 -55.8 70 -99 SPO 1997 10 17 11 23 82 2.1 -9 673.60 -58.3 -56.2 -55.7 71 -99 SPO 1997 10 17 11 24 79 2.0 -9 673.60 -58.2 -56.2 -55.6 69 -99 SPO 1997 10 17 11 25 78 1.9 -9 673.60 -58.2 -56.3 -55.6 69 -99 SPO 1997 10 17 11 26 78 1.9 -9 673.60 -58.2 -56.3 -55.6 69 -99 SPO 1997 10 17 11 27 79 2.3 -9 673.60 -58.2 -56.1 -55.6 70 -99 SPO 1997 10 17 11 28 80 2.6 -9 673.60 -58.0 -55.9 -55.7 68 -99 SPO 1997 10 17 11 29 80 2.6 -9 673.60 -58.0 -55.8 -55.8 68 -99 SPO 1997 10 17 11 30 81 2.6 -9 673.60 -57.9 -55.8 -55.9 67 -99 SPO 1997 10 17 11 31 82 2.4 -9 673.60 -57.8 -55.9 -56.0 67 -99 SPO 1997 10 17 11 32 83 2.5 -9 673.60 -57.8 -56.1 -56.0 67 -99 SPO 1997 10 17 11 33 86 2.4 -9 673.60 -57.9 -56.2 -56.0 68 -99 SPO 1997 10 17 11 34 85 2.7 -9 673.60 -58.0 -56.2 -56.0 69 -99 SPO 1997 10 17 11 35 81 2.6 -9 673.60 -58.0 -56.0 -56.1 69 -99 SPO 1997 10 17 11 36 80 2.5 -9 673.60 -58.0 -55.8 -56.2 69 -99 SPO 1997 10 17 11 37 78 2.9 -9 673.60 -58.0 -55.6 -56.3 68 -99 SPO 1997 10 17 11 38 80 3.0 -9 673.60 -58.0 -55.6 -56.4 68 -99 SPO 1997 10 17 11 39 82 2.9 -9 673.60 -58.1 -55.5 -56.4 69 -99 SPO 1997 10 17 11 40 82 2.8 -9 673.60 -58.1 -55.6 -56.4 68 -99 SPO 1997 10 17 11 41 87 2.6 -9 673.60 -58.1 -55.7 -56.4 68 -99 SPO 1997 10 17 11 42 88 2.5 -9 673.60 -58.1 -55.7 -56.4 68 -99 SPO 1997 10 17 11 43 87 2.7 -9 673.60 -58.2 -55.6 -56.4 68 -99 SPO 1997 10 17 11 44 85 2.6 -9 673.60 -58.1 -55.6 -56.4 66 -99 SPO 1997 10 17 11 45 83 2.7 -9 673.60 -58.1 -55.5 -56.3 66 -99 SPO 1997 10 17 11 46 82 2.7 -9 673.60 -58.1 -55.6 -56.4 66 -99 SPO 1997 10 17 11 47 81 2.9 -9 673.60 -58.1 -55.5 -56.5 66 -99 SPO 1997 10 17 11 48 80 2.8 -9 673.60 -58.1 -55.5 -56.6 66 -99 SPO 1997 10 17 11 49 79 2.6 -9 673.60 -58.2 -55.6 -56.6 67 -99 SPO 1997 10 17 11 50 80 2.7 -9 673.60 -58.2 -55.7 -56.6 67 -99 SPO 1997 10 17 11 51 80 2.7 -9 673.60 -58.2 -55.8 -56.7 68 -99 SPO 1997 10 17 11 52 80 2.8 -9 673.60 -58.2 -55.8 -56.8 68 -99 SPO 1997 10 17 11 53 80 2.7 -9 673.50 -58.3 -55.8 -56.8 69 -99 SPO 1997 10 17 11 54 80 2.6 -9 673.50 -58.3 -55.8 -56.9 68 -99 SPO 1997 10 17 11 55 80 2.9 -9 673.60 -58.3 -55.6 -56.9 68 -99 SPO 1997 10 17 11 56 80 2.7 -9 673.60 -58.4 -55.6 -56.9 69 -99 SPO 1997 10 17 11 57 76 2.4 -9 673.60 -58.4 -55.6 -57.0 68 -99 SPO 1997 10 17 11 58 79 2.6 -9 673.60 -58.4 -55.6 -57.0 68 -99 SPO 1997 10 17 11 59 77 2.5 -9 673.50 -58.4 -55.6 -57.0 68 -99 SPO 1997 10 17 12 00 75 2.4 -9 673.50 -58.4 -55.5 -56.9 66 0 SPO 1997 10 17 12 01 75 2.5 -9 673.50 -58.4 -55.5 -57.0 66 -99 SPO 1997 10 17 12 02 71 2.1 -9 673.50 -58.4 -55.5 -56.9 66 -99 SPO 1997 10 17 12 03 75 2.4 -9 673.50 -58.4 -55.6 -56.9 66 -99 SPO 1997 10 17 12 04 73 2.5 -9 673.50 -58.3 -55.5 -56.9 66 -99 SPO 1997 10 17 12 05 71 2.9 -9 673.50 -58.3 -55.5 -56.9 66 -99 SPO 1997 10 17 12 06 74 2.9 -9 673.50 -58.2 -55.6 -57.0 66 -99 SPO 1997 10 17 12 07 73 3.0 -9 673.40 -58.2 -55.5 -57.0 66 -99 SPO 1997 10 17 12 08 69 2.8 -9 673.40 -58.2 -55.5 -57.0 67 -99 SPO 1997 10 17 12 09 71 2.7 -9 673.40 -58.2 -55.7 -57.0 67 -99 SPO 1997 10 17 12 10 70 3.0 -9 673.40 -58.1 -55.8 -57.0 66 -99 SPO 1997 10 17 12 11 67 2.6 -9 673.40 -58.0 -55.8 -56.9 66 -99 SPO 1997 10 17 12 12 70 2.8 -9 673.40 -58.0 -55.8 -56.9 66 -99 SPO 1997 10 17 12 13 70 2.7 -9 673.40 -58.0 -55.8 -56.8 66 -99 SPO 1997 10 17 12 14 68 2.6 -9 673.40 -58.0 -55.8 -56.8 67 -99 SPO 1997 10 17 12 15 68 2.7 -9 673.40 -58.0 -55.8 -56.7 68 -99 SPO 1997 10 17 12 16 70 2.8 -9 673.40 -57.9 -55.7 -56.7 68 -99 SPO 1997 10 17 12 17 72 2.9 -9 673.40 -57.9 -55.7 -56.6 68 -99 SPO 1997 10 17 12 18 72 2.6 -9 673.30 -57.9 -55.6 -56.6 69 -99 SPO 1997 10 17 12 19 72 2.8 -9 673.30 -57.9 -55.6 -56.5 70 -99 SPO 1997 10 17 12 20 71 2.6 -9 673.30 -58.0 -55.6 -56.5 71 -99 SPO 1997 10 17 12 21 74 2.3 -9 673.30 -58.0 -55.8 -56.5 71 -99 SPO 1997 10 17 12 22 70 2.1 -9 673.30 -58.0 -55.8 -56.4 71 -99 SPO 1997 10 17 12 23 70 2.1 -9 673.30 -58.0 -55.9 -56.4 72 -99 SPO 1997 10 17 12 24 69 1.9 -9 673.30 -58.0 -56.0 -56.4 72 -99 SPO 1997 10 17 12 25 64 1.8 -9 673.30 -58.0 -56.0 -56.4 71 -99 SPO 1997 10 17 12 26 65 1.7 -9 673.30 -58.0 -55.9 -56.3 71 -99 SPO 1997 10 17 12 27 65 1.9 -9 673.30 -57.9 -55.8 -56.3 70 -99 SPO 1997 10 17 12 28 66 2.0 -9 673.30 -57.9 -55.7 -56.2 71 -99 SPO 1997 10 17 12 29 67 2.4 -9 673.30 -57.8 -55.6 -56.2 71 -99 SPO 1997 10 17 12 30 66 2.5 -9 673.30 -57.8 -55.6 -56.2 72 -99 SPO 1997 10 17 12 31 65 2.4 -9 673.30 -57.7 -55.6 -56.2 72 -99 SPO 1997 10 17 12 32 60 2.1 -9 673.30 -57.7 -55.8 -56.2 72 -99 SPO 1997 10 17 12 33 60 1.9 -9 673.30 -57.6 -56.0 -56.1 71 -99 SPO 1997 10 17 12 34 56 1.9 -9 673.30 -57.6 -56.0 -56.2 72 -99 SPO 1997 10 17 12 35 61 2.1 -9 673.30 -57.6 -55.9 -56.0 73 -99 SPO 1997 10 17 12 36 64 2.1 -9 673.30 -57.5 -55.8 -56.0 72 -99 SPO 1997 10 17 12 37 65 2.5 -9 673.30 -57.5 -55.7 -56.0 72 -99 SPO 1997 10 17 12 38 63 2.5 -9 673.30 -57.5 -55.6 -56.0 72 -99 SPO 1997 10 17 12 39 63 2.6 -9 673.30 -57.4 -55.6 -56.2 71 -99 SPO 1997 10 17 12 40 64 2.8 -9 673.30 -57.4 -55.5 -56.2 71 -99 SPO 1997 10 17 12 41 64 3.1 -9 673.30 -57.4 -55.4 -56.2 70 -99 SPO 1997 10 17 12 42 63 3.1 -9 673.20 -57.3 -55.3 -56.2 69 -99 SPO 1997 10 17 12 43 63 3.2 -9 673.20 -57.4 -55.3 -56.3 71 -99 SPO 1997 10 17 12 44 64 3.4 -9 673.30 -57.4 -55.2 -56.3 71 -99 SPO 1997 10 17 12 45 66 3.3 -9 673.30 -57.4 -55.1 -56.4 70 -99 SPO 1997 10 17 12 46 65 3.4 -9 673.20 -57.4 -55.1 -56.4 71 -99 SPO 1997 10 17 12 47 65 3.1 -9 673.20 -57.4 -55.1 -56.3 71 -99 SPO 1997 10 17 12 48 63 2.8 -9 673.30 -57.4 -55.1 -56.3 70 -99 SPO 1997 10 17 12 49 63 3.0 -9 673.20 -57.3 -55.2 -56.2 69 -99 SPO 1997 10 17 12 50 64 2.6 -9 673.30 -57.3 -55.2 -56.2 70 -99 SPO 1997 10 17 12 51 66 2.6 -9 673.30 -57.2 -55.3 -56.1 69 -99 SPO 1997 10 17 12 52 66 2.4 -9 673.30 -57.1 -55.4 -56.0 68 -99 SPO 1997 10 17 12 53 65 2.2 -9 673.30 -57.1 -55.5 -55.9 69 -99 SPO 1997 10 17 12 54 62 2.1 -9 673.30 -57.1 -55.6 -55.8 69 -99 SPO 1997 10 17 12 55 57 1.7 -9 673.30 -57.0 -55.7 -55.7 69 -99 SPO 1997 10 17 12 56 58 1.8 -9 673.30 -56.9 -55.7 -55.6 69 -99 SPO 1997 10 17 12 57 60 2.0 -9 673.30 -56.9 -55.7 -55.5 71 -99 SPO 1997 10 17 12 58 62 2.3 -9 673.30 -56.8 -55.7 -55.5 70 -99 SPO 1997 10 17 12 59 63 2.4 -9 673.20 -56.7 -55.6 -55.5 70 -99 SPO 1997 10 17 13 00 64 2.5 -9 673.20 -56.6 -55.5 -55.5 70 0 SPO 1997 10 17 13 01 63 2.6 -9 673.20 -56.6 -55.4 -55.5 71 -99 SPO 1997 10 17 13 02 65 2.9 -9 673.20 -56.6 -55.3 -55.5 72 -99 SPO 1997 10 17 13 03 65 3.0 -9 673.20 -56.6 -55.3 -55.5 72 -99 SPO 1997 10 17 13 04 65 3.3 -9 673.20 -56.6 -55.3 -55.6 72 -99 SPO 1997 10 17 13 05 63 3.3 -9 673.20 -56.6 -55.3 -55.6 72 -99 SPO 1997 10 17 13 06 63 3.1 -9 673.20 -56.6 -55.3 -55.7 71 -99 SPO 1997 10 17 13 07 64 3.1 -9 673.20 -56.7 -55.3 -55.6 71 -99 SPO 1997 10 17 13 08 65 3.0 -9 673.20 -56.8 -55.4 -55.6 72 -99 SPO 1997 10 17 13 09 63 2.9 -9 673.20 -56.9 -55.5 -55.7 71 -99 SPO 1997 10 17 13 10 65 2.8 -9 673.20 -56.9 -55.7 -55.7 71 -99 SPO 1997 10 17 13 11 67 2.7 -9 673.20 -57.0 -55.8 -55.7 72 -99 SPO 1997 10 17 13 12 66 2.7 -9 673.20 -57.0 -56.0 -55.7 72 -99 SPO 1997 10 17 13 13 66 2.7 -9 673.20 -57.1 -56.0 -55.8 73 -99 SPO 1997 10 17 13 14 65 2.7 -9 673.20 -57.2 -56.0 -55.8 73 -99 SPO 1997 10 17 13 15 65 2.5 -9 673.20 -57.2 -56.0 -55.8 72 -99 SPO 1997 10 17 13 16 64 2.7 -9 673.20 -57.3 -56.0 -55.9 73 -99 SPO 1997 10 17 13 17 61 2.5 -9 673.10 -57.4 -56.0 -55.9 74 -99 SPO 1997 10 17 13 18 61 2.5 -9 673.20 -57.4 -56.0 -55.9 73 -99 SPO 1997 10 17 13 19 60 2.6 -9 673.20 -57.4 -56.0 -55.9 72 -99 SPO 1997 10 17 13 20 62 2.5 -9 673.20 -57.4 -56.1 -55.9 70 -99 SPO 1997 10 17 13 21 63 2.5 -9 673.20 -57.4 -56.0 -55.9 69 -99 SPO 1997 10 17 13 22 64 2.4 -9 673.20 -57.4 -56.0 -55.9 69 -99 SPO 1997 10 17 13 23 65 2.6 -9 673.20 -57.4 -56.0 -55.9 69 -99 SPO 1997 10 17 13 24 63 2.5 -9 673.20 -57.4 -56.0 -55.9 68 -99 SPO 1997 10 17 13 25 62 2.6 -9 673.20 -57.5 -56.0 -55.9 69 -99 SPO 1997 10 17 13 26 63 2.5 -9 673.20 -57.5 -55.9 -55.9 69 -99 SPO 1997 10 17 13 27 65 2.8 -9 673.20 -57.4 -55.9 -55.9 68 -99 SPO 1997 10 17 13 28 64 2.8 -9 673.20 -57.4 -55.8 -55.9 68 -99 SPO 1997 10 17 13 29 66 3.1 -9 673.20 -57.3 -55.7 -55.9 68 -99 SPO 1997 10 17 13 30 66 3.0 -9 673.10 -57.3 -55.6 -55.9 68 -99 SPO 1997 10 17 13 31 66 3.2 -9 673.10 -57.3 -55.6 -55.9 68 -99 SPO 1997 10 17 13 32 67 3.2 -9 673.10 -57.3 -55.5 -55.9 69 -99 SPO 1997 10 17 13 33 69 3.3 -9 673.20 -57.2 -55.5 -55.9 68 -99 SPO 1997 10 17 13 34 70 3.4 -9 673.20 -57.2 -55.5 -55.8 68 -99 SPO 1997 10 17 13 35 72 3.3 -9 673.20 -57.2 -55.5 -55.8 68 -99 SPO 1997 10 17 13 36 72 3.3 -9 673.20 -57.2 -55.4 -55.9 68 -99 SPO 1997 10 17 13 37 73 3.4 -9 673.20 -57.2 -55.4 -55.9 69 -99 SPO 1997 10 17 13 38 73 3.4 -9 673.20 -57.2 -55.4 -55.9 69 -99 SPO 1997 10 17 13 39 72 3.5 -9 673.20 -57.2 -55.4 -55.9 70 -99 SPO 1997 10 17 13 40 71 3.4 -9 673.20 -57.3 -55.4 -55.9 71 -99 SPO 1997 10 17 13 41 72 3.6 -9 673.20 -57.3 -55.3 -55.9 71 -99 SPO 1997 10 17 13 42 72 3.5 -9 673.20 -57.3 -55.3 -55.9 71 -99 SPO 1997 10 17 13 43 71 3.6 -9 673.20 -57.3 -55.3 -55.9 71 -99 SPO 1997 10 17 13 44 70 3.7 -9 673.10 -57.3 -55.3 -56.0 72 -99 SPO 1997 10 17 13 45 69 3.7 -9 673.10 -57.4 -55.2 -56.0 72 -99 SPO 1997 10 17 13 46 69 3.7 -9 673.10 -57.4 -55.1 -56.0 72 -99 SPO 1997 10 17 13 47 70 3.9 -9 673.10 -57.4 -55.0 -56.0 72 -99 SPO 1997 10 17 13 48 69 3.9 -9 673.10 -57.3 -55.0 -56.0 70 -99 SPO 1997 10 17 13 49 70 4.0 -9 673.10 -57.3 -54.9 -56.0 69 -99 SPO 1997 10 17 13 50 71 3.9 -9 673.10 -57.3 -54.9 -56.1 69 -99 SPO 1997 10 17 13 51 70 3.9 -9 673.10 -57.3 -55.0 -56.1 69 -99 SPO 1997 10 17 13 52 70 3.9 -9 673.10 -57.3 -55.0 -56.1 69 -99 SPO 1997 10 17 13 53 70 3.9 -9 673.10 -57.3 -54.9 -56.1 69 -99 SPO 1997 10 17 13 54 69 3.8 -9 673.10 -57.4 -54.9 -56.1 70 -99 SPO 1997 10 17 13 55 70 3.7 -9 673.10 -57.4 -55.0 -56.1 70 -99 SPO 1997 10 17 13 56 69 3.7 -9 673.10 -57.4 -55.0 -56.1 70 -99 SPO 1997 10 17 13 57 69 3.7 -9 673.10 -57.5 -55.1 -56.1 70 -99 SPO 1997 10 17 13 58 69 3.5 -9 673.10 -57.5 -55.2 -56.1 69 -99 SPO 1997 10 17 13 59 70 3.4 -9 673.10 -57.5 -55.2 -56.0 69 -99 SPO 1997 10 17 14 00 70 3.3 -9 673.10 -57.6 -55.3 -56.0 70 0 SPO 1997 10 17 14 01 71 3.1 -9 673.00 -57.6 -55.4 -56.0 68 -99 SPO 1997 10 17 14 02 72 3.1 -9 673.00 -57.7 -55.4 -56.0 69 -99 SPO 1997 10 17 14 03 71 3.1 -9 673.10 -57.7 -55.5 -55.9 68 -99 SPO 1997 10 17 14 04 72 3.0 -9 673.00 -57.7 -55.5 -55.9 67 -99 SPO 1997 10 17 14 05 71 3.0 -9 673.00 -57.8 -55.5 -55.9 68 -99 SPO 1997 10 17 14 06 70 3.0 -9 673.10 -57.8 -55.6 -55.9 68 -99 SPO 1997 10 17 14 07 69 3.1 -9 673.00 -57.8 -55.6 -55.9 68 -99 SPO 1997 10 17 14 08 69 3.1 -9 673.10 -57.8 -55.5 -55.9 68 -99 SPO 1997 10 17 14 09 68 3.1 -9 673.10 -57.8 -55.4 -55.9 67 -99 SPO 1997 10 17 14 10 69 3.1 -9 673.10 -57.9 -55.4 -55.9 68 -99 SPO 1997 10 17 14 11 70 3.1 -9 673.00 -57.8 -55.4 -55.9 67 -99 SPO 1997 10 17 14 12 71 3.0 -9 673.10 -57.8 -55.4 -55.9 67 -99 SPO 1997 10 17 14 13 71 2.9 -9 673.10 -57.8 -55.5 -55.8 67 -99 SPO 1997 10 17 14 14 72 3.0 -9 673.10 -57.8 -55.5 -55.6 67 -99 SPO 1997 10 17 14 15 73 2.9 -9 673.10 -57.8 -55.6 -55.5 67 -99 SPO 1997 10 17 14 16 74 2.9 -9 673.10 -57.7 -55.6 -55.5 65 -99 SPO 1997 10 17 14 17 73 2.9 -9 673.10 -57.7 -55.5 -55.5 64 -99 SPO 1997 10 17 14 18 71 3.0 -9 673.10 -57.7 -55.5 -55.6 64 -99 SPO 1997 10 17 14 19 72 3.1 -9 673.10 -57.7 -55.4 -55.6 64 -99 SPO 1997 10 17 14 20 72 3.0 -9 673.10 -57.7 -55.4 -55.7 65 -99 SPO 1997 10 17 14 21 72 3.1 -9 673.10 -57.7 -55.4 -55.7 66 -99 SPO 1997 10 17 14 22 73 3.2 -9 673.00 -57.7 -55.5 -55.8 66 -99 SPO 1997 10 17 14 23 73 3.2 -9 673.00 -57.7 -55.5 -55.8 66 -99 SPO 1997 10 17 14 24 73 3.2 -9 673.10 -57.6 -55.5 -55.7 65 -99 SPO 1997 10 17 14 25 75 3.1 -9 673.10 -57.6 -55.5 -55.7 64 -99 SPO 1997 10 17 14 26 75 3.2 -9 673.10 -57.6 -55.5 -55.6 65 -99 SPO 1997 10 17 14 27 77 3.2 -9 673.10 -57.5 -55.5 -55.5 64 -99 SPO 1997 10 17 14 28 78 3.3 -9 673.10 -57.4 -55.5 -55.4 64 -99 SPO 1997 10 17 14 29 78 3.3 -9 673.10 -57.4 -55.4 -55.4 65 -99 SPO 1997 10 17 14 30 77 3.3 -9 673.10 -57.4 -55.3 -55.4 65 -99 SPO 1997 10 17 14 31 77 3.3 -9 673.10 -57.4 -55.3 -55.4 64 -99 SPO 1997 10 17 14 32 78 3.3 -9 673.10 -57.4 -55.3 -55.4 64 -99 SPO 1997 10 17 14 33 78 3.4 -9 673.10 -57.4 -55.3 -55.4 64 -99 SPO 1997 10 17 14 34 79 3.3 -9 673.00 -57.4 -55.3 -55.4 64 -99 SPO 1997 10 17 14 35 78 3.5 -9 673.00 -57.5 -55.3 -55.4 65 -99 SPO 1997 10 17 14 36 76 3.4 -9 673.00 -57.5 -55.2 -55.5 65 -99 SPO 1997 10 17 14 37 77 3.5 -9 673.00 -57.5 -55.2 -55.6 65 -99 SPO 1997 10 17 14 38 78 3.5 -9 673.00 -57.5 -55.1 -55.5 65 -99 SPO 1997 10 17 14 39 80 3.4 -9 673.00 -57.5 -55.1 -55.6 65 -99 SPO 1997 10 17 14 40 81 3.6 -9 673.00 -57.6 -55.1 -55.6 66 -99 SPO 1997 10 17 14 41 80 3.5 -9 673.00 -57.5 -55.0 -55.6 64 -99 SPO 1997 10 17 14 42 80 3.6 -9 673.00 -57.5 -54.9 -55.6 64 -99 SPO 1997 10 17 14 43 81 3.7 -9 673.00 -57.5 -54.9 -55.6 64 -99 SPO 1997 10 17 14 44 82 3.7 -9 673.00 -57.5 -54.8 -55.6 64 -99 SPO 1997 10 17 14 45 81 3.7 -9 673.00 -57.5 -54.9 -55.7 63 -99 SPO 1997 10 17 14 46 82 3.7 -9 673.00 -57.6 -54.9 -55.7 64 -99 SPO 1997 10 17 14 47 81 3.8 -9 673.00 -57.6 -54.9 -55.7 63 -99 SPO 1997 10 17 14 48 82 3.7 -9 673.00 -57.7 -54.9 -55.8 64 -99 SPO 1997 10 17 14 49 81 3.7 -9 673.00 -57.7 -55.0 -55.8 64 -99 SPO 1997 10 17 14 50 83 3.6 -9 673.00 -57.8 -55.0 -55.8 65 -99 SPO 1997 10 17 14 51 84 3.6 -9 673.00 -57.8 -55.0 -55.9 65 -99 SPO 1997 10 17 14 52 83 3.6 -9 673.00 -57.8 -55.0 -55.8 64 -99 SPO 1997 10 17 14 53 82 3.6 -9 673.00 -57.8 -54.9 -55.9 64 -99 SPO 1997 10 17 14 54 82 3.6 -9 673.00 -57.7 -54.9 -55.8 63 -99 SPO 1997 10 17 14 55 82 3.6 -9 673.00 -57.7 -54.9 -55.8 64 -99 SPO 1997 10 17 14 56 84 3.6 -9 673.00 -57.7 -54.9 -55.8 64 -99 SPO 1997 10 17 14 57 84 3.7 -9 673.00 -57.6 -54.8 -55.8 63 -99 SPO 1997 10 17 14 58 84 3.6 -9 673.00 -57.6 -54.8 -55.7 63 -99 SPO 1997 10 17 14 59 84 3.7 -9 673.00 -57.5 -54.8 -55.7 62 -99 SPO 1997 10 17 15 00 84 3.7 -9 673.00 -57.4 -54.7 -55.6 61 0 SPO 1997 10 17 15 01 84 3.6 -9 673.00 -57.4 -54.8 -55.6 62 -99 SPO 1997 10 17 15 02 84 3.6 -9 673.00 -57.3 -54.8 -55.6 61 -99 SPO 1997 10 17 15 03 84 3.5 -9 673.00 -57.4 -54.9 -55.6 62 -99 SPO 1997 10 17 15 04 83 3.7 -9 673.00 -57.3 -54.9 -55.6 63 -99 SPO 1997 10 17 15 05 83 3.6 -9 673.00 -57.2 -54.9 -55.6 62 -99 SPO 1997 10 17 15 06 82 3.6 -9 673.00 -57.2 -54.9 -55.5 63 -99 SPO 1997 10 17 15 07 81 3.7 -9 673.00 -57.1 -54.9 -55.5 63 -99 SPO 1997 10 17 15 08 79 3.7 -9 673.00 -57.0 -54.9 -55.5 62 -99 SPO 1997 10 17 15 09 79 3.7 -9 672.90 -57.0 -54.9 -55.5 63 -99 SPO 1997 10 17 15 10 78 3.8 -9 672.90 -57.1 -54.8 -55.5 64 -99 SPO 1997 10 17 15 11 78 3.8 -9 672.90 -57.1 -54.8 -55.4 64 -99 SPO 1997 10 17 15 12 79 3.8 -9 672.90 -57.1 -54.8 -55.4 63 -99 SPO 1997 10 17 15 13 79 3.9 -9 672.90 -57.1 -54.8 -55.4 63 -99 SPO 1997 10 17 15 14 80 3.9 -9 672.90 -57.1 -54.8 -55.4 63 -99 SPO 1997 10 17 15 15 78 3.8 -9 672.90 -57.1 -54.8 -55.4 63 -99 SPO 1997 10 17 15 16 77 3.8 -9 672.90 -57.1 -54.8 -55.4 63 -99 SPO 1997 10 17 15 17 77 3.9 -9 672.90 -57.1 -54.8 -55.4 64 -99 SPO 1997 10 17 15 18 76 4.0 -9 672.90 -57.1 -54.8 -55.4 64 -99 SPO 1997 10 17 15 19 76 4.0 -9 672.90 -57.1 -54.8 -55.4 65 -99 SPO 1997 10 17 15 20 76 4.1 -9 672.80 -57.1 -54.7 -55.5 65 -99 SPO 1997 10 17 15 21 76 4.1 -9 672.80 -57.1 -54.7 -55.5 65 -99 SPO 1997 10 17 15 22 76 4.2 -9 672.80 -57.1 -54.7 -55.5 65 -99 SPO 1997 10 17 15 23 75 4.2 -9 672.80 -57.1 -54.7 -55.6 65 -99 SPO 1997 10 17 15 24 73 4.3 -9 672.80 -57.1 -54.8 -55.6 65 -99 SPO 1997 10 17 15 25 73 4.2 -9 672.80 -57.1 -54.8 -55.7 65 -99 SPO 1997 10 17 15 26 73 4.2 -9 672.80 -57.1 -54.8 -55.7 64 -99 SPO 1997 10 17 15 27 74 4.3 -9 672.80 -57.1 -54.8 -55.8 64 -99 SPO 1997 10 17 15 28 73 4.4 -9 672.70 -57.1 -54.7 -55.8 63 -99 SPO 1997 10 17 15 29 72 4.5 -9 672.70 -57.1 -54.7 -55.9 63 -99 SPO 1997 10 17 15 30 72 4.6 -9 672.70 -57.1 -54.6 -55.9 63 -99 SPO 1997 10 17 15 31 72 4.7 -9 672.70 -57.0 -54.4 -55.9 62 -99 SPO 1997 10 17 15 32 72 4.7 -9 672.70 -57.1 -54.2 -56.0 63 -99 SPO 1997 10 17 15 33 72 4.7 -9 672.70 -57.1 -54.2 -56.0 63 -99 SPO 1997 10 17 15 34 73 4.7 -9 672.70 -57.1 -54.2 -56.0 63 -99 SPO 1997 10 17 15 35 74 4.6 -9 672.70 -57.2 -54.2 -56.0 64 -99 SPO 1997 10 17 15 36 75 4.6 -9 672.70 -57.3 -54.2 -55.9 66 -99 SPO 1997 10 17 15 37 76 4.6 -9 672.70 -57.3 -54.2 -55.9 66 -99 SPO 1997 10 17 15 38 76 4.5 -9 672.80 -57.4 -54.2 -55.9 66 -99 SPO 1997 10 17 15 39 77 4.5 -9 672.70 -57.4 -54.2 -55.9 65 -99 SPO 1997 10 17 15 40 78 4.5 -9 672.80 -57.4 -54.3 -55.9 63 -99 SPO 1997 10 17 15 41 79 4.5 -9 672.70 -57.5 -54.4 -55.9 63 -99 SPO 1997 10 17 15 42 79 4.4 -9 672.80 -57.5 -54.4 -55.8 63 -99 SPO 1997 10 17 15 43 79 4.3 -9 672.80 -57.5 -54.5 -55.8 63 -99 SPO 1997 10 17 15 44 80 4.3 -9 672.80 -57.6 -54.5 -55.8 63 -99 SPO 1997 10 17 15 45 81 4.2 -9 672.80 -57.6 -54.5 -55.9 64 -99 SPO 1997 10 17 15 46 81 4.2 -9 672.80 -57.7 -54.6 -55.9 64 -99 SPO 1997 10 17 15 47 82 4.1 -9 672.80 -57.7 -54.5 -55.9 64 -99 SPO 1997 10 17 15 48 82 4.2 -9 672.80 -57.8 -54.5 -55.9 64 -99 SPO 1997 10 17 15 49 82 4.1 -9 672.80 -57.8 -54.5 -56.0 64 -99 SPO 1997 10 17 15 50 82 4.0 -9 672.80 -57.8 -54.6 -56.0 64 -99 SPO 1997 10 17 15 51 81 4.0 -9 672.80 -57.9 -54.6 -56.0 64 -99 SPO 1997 10 17 15 52 80 4.0 -9 672.70 -57.9 -54.6 -56.0 62 -99 SPO 1997 10 17 15 53 79 4.1 -9 672.80 -58.0 -54.6 -56.0 62 -99 SPO 1997 10 17 15 54 79 4.2 -9 672.70 -58.0 -54.6 -56.1 62 -99 SPO 1997 10 17 15 55 79 4.1 -9 672.70 -58.0 -54.6 -56.1 62 -99 SPO 1997 10 17 15 56 80 4.0 -9 672.70 -58.0 -54.5 -56.2 62 -99 SPO 1997 10 17 15 57 80 4.0 -9 672.80 -58.1 -54.5 -56.2 63 -99 SPO 1997 10 17 15 58 81 4.0 -9 672.80 -58.1 -54.6 -56.1 63 -99 SPO 1997 10 17 15 59 82 3.9 -9 672.80 -58.2 -54.7 -56.1 64 -99 SPO 1997 10 17 16 00 82 3.8 -9 672.80 -58.2 -54.6 -56.2 63 0 SPO 1997 10 17 16 01 81 3.8 -9 672.80 -58.3 -54.7 -56.2 63 -99 SPO 1997 10 17 16 02 80 3.9 -9 672.80 -58.4 -54.7 -56.3 64 -99 SPO 1997 10 17 16 03 80 3.9 -9 672.80 -58.4 -54.6 -56.3 63 -99 SPO 1997 10 17 16 04 81 3.8 -9 672.80 -58.5 -54.7 -56.4 63 -99 SPO 1997 10 17 16 05 80 3.8 -9 672.80 -58.6 -54.7 -56.5 63 -99 SPO 1997 10 17 16 06 80 3.8 -9 672.80 -58.6 -54.8 -56.6 62 -99 SPO 1997 10 17 16 07 81 3.8 -9 672.80 -58.5 -54.8 -56.6 61 -99 SPO 1997 10 17 16 08 81 3.8 -9 672.80 -58.5 -54.8 -56.6 61 -99 SPO 1997 10 17 16 09 81 3.9 -9 672.80 -58.5 -54.8 -56.6 62 -99 SPO 1997 10 17 16 10 81 4.0 -9 672.80 -58.4 -54.8 -56.5 61 -99 SPO 1997 10 17 16 11 81 4.1 -9 672.80 -58.3 -54.8 -56.5 61 -99 SPO 1997 10 17 16 12 82 4.0 -9 672.80 -58.2 -54.8 -56.4 61 -99 SPO 1997 10 17 16 13 83 4.0 -9 672.80 -58.2 -54.7 -56.5 62 -99 SPO 1997 10 17 16 14 83 4.0 -9 672.80 -58.2 -54.7 -56.5 62 -99 SPO 1997 10 17 16 15 82 4.2 -9 672.80 -58.2 -54.7 -56.4 63 -99 SPO 1997 10 17 16 16 82 4.2 -9 672.80 -58.1 -54.7 -56.2 63 -99 SPO 1997 10 17 16 17 82 4.2 -9 672.80 -58.1 -54.7 -56.1 63 -99 SPO 1997 10 17 16 18 82 4.1 -9 672.70 -58.1 -54.8 -56.1 62 -99 SPO 1997 10 17 16 19 81 4.0 -9 672.70 -58.1 -54.7 -56.1 62 -99 SPO 1997 10 17 16 20 81 4.0 -9 672.70 -58.1 -54.8 -56.1 62 -99 SPO 1997 10 17 16 21 81 4.0 -9 672.70 -58.2 -54.8 -56.2 62 -99 SPO 1997 10 17 16 22 80 4.0 -9 672.70 -58.2 -54.8 -56.2 62 -99 SPO 1997 10 17 16 23 78 4.1 -9 672.70 -58.2 -54.8 -56.2 63 -99 SPO 1997 10 17 16 24 77 4.1 -9 672.70 -58.2 -54.8 -56.2 64 -99 SPO 1997 10 17 16 25 76 4.2 -9 672.70 -58.2 -54.7 -56.2 64 -99 SPO 1997 10 17 16 26 75 4.2 -9 672.60 -58.2 -54.7 -56.2 64 -99 SPO 1997 10 17 16 27 74 4.3 -9 672.60 -58.2 -54.7 -56.4 64 -99 SPO 1997 10 17 16 28 73 4.4 -9 672.60 -58.2 -54.6 -56.5 64 -99 SPO 1997 10 17 16 29 72 4.4 -9 672.60 -58.3 -54.7 -56.6 65 -99 SPO 1997 10 17 16 30 73 4.3 -9 672.60 -58.4 -54.7 -56.6 65 -99 SPO 1997 10 17 16 31 73 4.3 -9 672.60 -58.4 -54.6 -56.6 64 -99 SPO 1997 10 17 16 32 74 4.3 -9 672.60 -58.4 -54.6 -56.6 64 -99 SPO 1997 10 17 16 33 75 4.2 -9 672.60 -58.4 -54.5 -56.6 62 -99 SPO 1997 10 17 16 34 75 4.2 -9 672.60 -58.4 -54.6 -56.6 62 -99 SPO 1997 10 17 16 35 77 4.2 -9 672.60 -58.4 -54.6 -56.5 62 -99 SPO 1997 10 17 16 36 77 4.2 -9 672.60 -58.5 -54.6 -56.5 63 -99 SPO 1997 10 17 16 37 78 4.3 -9 672.60 -58.5 -54.6 -56.5 63 -99 SPO 1997 10 17 16 38 79 4.3 -9 672.60 -58.5 -54.7 -56.6 63 -99 SPO 1997 10 17 16 39 79 4.3 -9 672.60 -58.6 -54.8 -56.6 64 -99 SPO 1997 10 17 16 40 79 4.3 -9 672.60 -58.6 -54.9 -56.6 64 -99 SPO 1997 10 17 16 41 78 4.3 -9 672.60 -58.6 -54.9 -56.6 64 -99 SPO 1997 10 17 16 42 79 4.3 -9 672.60 -58.6 -54.9 -56.7 64 -99 SPO 1997 10 17 16 43 78 4.4 -9 672.60 -58.6 -54.9 -56.7 64 -99 SPO 1997 10 17 16 44 78 4.5 -9 672.60 -58.6 -54.8 -56.7 64 -99 SPO 1997 10 17 16 45 78 4.5 -9 672.60 -58.6 -54.8 -56.7 63 -99 SPO 1997 10 17 16 46 78 4.5 -9 672.60 -58.5 -54.8 -56.7 62 -99 SPO 1997 10 17 16 47 77 4.5 -9 672.60 -58.6 -54.8 -56.7 63 -99 SPO 1997 10 17 16 48 77 4.6 -9 672.60 -58.5 -54.7 -56.7 63 -99 SPO 1997 10 17 16 49 76 4.6 -9 672.60 -58.5 -54.7 -56.8 63 -99 SPO 1997 10 17 16 50 76 4.7 -9 672.60 -58.5 -54.6 -56.8 63 -99 SPO 1997 10 17 16 51 76 4.7 -9 672.60 -58.5 -54.6 -56.8 63 -99 SPO 1997 10 17 16 52 75 4.7 -9 672.60 -58.5 -54.6 -56.9 64 -99 SPO 1997 10 17 16 53 75 4.8 -9 672.60 -58.5 -54.5 -56.9 64 -99 SPO 1997 10 17 16 54 75 4.9 -9 672.60 -58.5 -54.5 -56.9 65 -99 SPO 1997 10 17 16 55 74 5.0 -9 672.60 -58.4 -54.3 -56.9 64 -99 SPO 1997 10 17 16 56 75 5.1 -9 672.70 -58.4 -54.2 -57.0 64 -99 SPO 1997 10 17 16 57 75 5.1 -9 672.70 -58.3 -54.2 -56.9 62 -99 SPO 1997 10 17 16 58 76 5.0 -9 672.70 -58.3 -54.2 -56.9 62 -99 SPO 1997 10 17 16 59 77 4.8 -9 672.70 -58.3 -54.2 -56.8 63 -99 SPO 1997 10 17 17 00 78 4.6 -9 672.70 -58.4 -54.3 -56.7 64 0 SPO 1997 10 17 17 01 78 4.4 -9 672.70 -58.4 -54.4 -56.7 64 -99 SPO 1997 10 17 17 02 79 4.3 -9 672.70 -58.5 -54.5 -56.7 66 -99 SPO 1997 10 17 17 03 80 4.4 -9 672.70 -58.6 -54.5 -56.7 66 -99 SPO 1997 10 17 17 04 79 4.4 -9 672.70 -58.7 -54.4 -56.8 66 -99 SPO 1997 10 17 17 05 79 4.4 -9 672.70 -58.7 -54.4 -56.8 66 -99 SPO 1997 10 17 17 06 78 4.3 -9 672.70 -58.8 -54.4 -56.9 66 -99 SPO 1997 10 17 17 07 77 4.3 -9 672.60 -58.7 -54.4 -56.8 65 -99 SPO 1997 10 17 17 08 76 4.3 -9 672.60 -58.7 -54.3 -56.9 65 -99 SPO 1997 10 17 17 09 75 4.3 -9 672.60 -58.7 -54.3 -57.0 65 -99 SPO 1997 10 17 17 10 74 4.5 -9 672.60 -58.7 -54.3 -57.1 65 -99 SPO 1997 10 17 17 11 74 4.7 -9 672.60 -58.6 -54.2 -57.1 64 -99 SPO 1997 10 17 17 12 72 4.5 -9 672.70 -58.5 -54.1 -57.1 63 -99 SPO 1997 10 17 17 13 72 4.4 -9 672.70 -58.6 -54.2 -57.1 64 -99 SPO 1997 10 17 17 14 73 4.5 -9 672.70 -58.5 -54.2 -57.1 64 -99 SPO 1997 10 17 17 15 75 4.6 -9 672.70 -58.4 -54.2 -56.9 64 -99 SPO 1997 10 17 17 16 74 4.3 -9 672.70 -58.4 -54.2 -56.8 64 -99 SPO 1997 10 17 17 17 74 4.0 -9 672.70 -58.5 -54.4 -56.8 65 -99 SPO 1997 10 17 17 18 74 3.8 -9 672.80 -58.6 -54.6 -56.7 65 -99 SPO 1997 10 17 17 19 78 3.9 -9 672.80 -58.6 -54.7 -56.6 64 -99 SPO 1997 10 17 17 20 77 3.6 -9 672.70 -58.7 -54.7 -56.5 65 -99 SPO 1997 10 17 17 21 77 3.5 -9 672.80 -58.8 -54.8 -56.4 65 -99 SPO 1997 10 17 17 22 79 3.7 -9 672.80 -58.9 -54.8 -56.4 65 -99 SPO 1997 10 17 17 23 82 3.8 -9 672.80 -59.0 -54.6 -56.8 65 -99 SPO 1997 10 17 17 24 79 3.6 -9 672.70 -59.2 -54.6 -57.4 67 -99 SPO 1997 10 17 17 25 79 3.6 -9 672.70 -59.4 -54.6 -57.6 68 -99 SPO 1997 10 17 17 26 82 3.6 -9 672.70 -59.4 -54.6 -57.6 67 -99 SPO 1997 10 17 17 27 83 3.6 -9 672.70 -59.1 -54.6 -57.4 65 -99 SPO 1997 10 17 17 28 85 3.7 -9 672.70 -59.1 -54.7 -57.3 65 -99 SPO 1997 10 17 17 29 85 3.6 -9 672.70 -59.0 -54.7 -57.4 64 -99 SPO 1997 10 17 17 30 87 3.6 -9 672.70 -59.2 -54.8 -57.5 65 -99 SPO 1997 10 17 17 31 88 3.5 -9 672.70 -59.3 -54.8 -57.8 66 -99 SPO 1997 10 17 17 32 91 3.5 -9 672.70 -59.4 -55.0 -58.1 67 -99 SPO 1997 10 17 17 33 93 3.5 -9 672.70 -59.4 -55.0 -58.1 66 -99 SPO 1997 10 17 17 34 92 3.4 -9 672.70 -59.2 -55.1 -58.0 64 -99 SPO 1997 10 17 17 35 94 3.4 -9 672.70 -59.1 -55.4 -57.9 64 -99 SPO 1997 10 17 17 36 94 3.5 -9 672.70 -59.2 -55.5 -57.9 65 -99 SPO 1997 10 17 17 37 94 3.7 -9 672.60 -59.0 -55.3 -57.8 64 -99 SPO 1997 10 17 17 38 94 3.8 -9 672.60 -59.0 -55.3 -57.8 65 -99 SPO 1997 10 17 17 39 95 3.7 -9 672.60 -58.9 -55.1 -57.8 65 -99 SPO 1997 10 17 17 40 94 3.6 -9 672.60 -58.9 -55.3 -57.7 65 -99 SPO 1997 10 17 17 41 97 3.6 -9 672.70 -58.7 -55.3 -57.6 63 -99 SPO 1997 10 17 17 42 101 3.8 -9 672.60 -58.6 -55.1 -57.6 63 -99 SPO 1997 10 17 17 43 102 3.7 -9 672.60 -58.5 -55.0 -57.6 63 -99 SPO 1997 10 17 17 44 103 3.7 -9 672.60 -58.5 -55.0 -57.5 63 -99 SPO 1997 10 17 17 45 104 3.7 -9 672.60 -58.6 -55.1 -57.6 65 -99 SPO 1997 10 17 17 46 105 3.6 -9 672.60 -58.5 -55.2 -57.6 65 -99 SPO 1997 10 17 17 47 103 3.6 -9 672.60 -58.6 -55.3 -57.6 66 -99 SPO 1997 10 17 17 48 102 3.6 -9 672.60 -58.5 -55.3 -57.5 66 -99 SPO 1997 10 17 17 49 100 3.4 -9 672.60 -58.4 -55.4 -57.4 65 -99 SPO 1997 10 17 17 50 98 3.5 -9 672.60 -58.4 -55.3 -57.2 65 -99 SPO 1997 10 17 17 51 97 3.6 -9 672.60 -58.4 -55.3 -57.2 65 -99 SPO 1997 10 17 17 52 94 3.6 -9 672.60 -58.3 -55.2 -57.0 64 -99 SPO 1997 10 17 17 53 94 3.7 -9 672.60 -58.4 -55.2 -56.9 65 -99 SPO 1997 10 17 17 54 90 3.5 -9 672.60 -58.4 -55.2 -56.8 66 -99 SPO 1997 10 17 17 55 91 3.8 -9 672.60 -58.4 -55.2 -56.7 66 -99 SPO 1997 10 17 17 56 89 3.8 -9 672.60 -58.4 -55.1 -56.7 66 -99 SPO 1997 10 17 17 57 87 4.0 -9 672.60 -58.4 -55.1 -56.7 66 -99 SPO 1997 10 17 17 58 85 4.0 -9 672.60 -58.6 -55.1 -56.7 67 -99 SPO 1997 10 17 17 59 84 4.0 -9 672.60 -58.6 -55.2 -56.8 67 -99 SPO 1997 10 17 18 00 82 4.1 -9 672.60 -58.6 -55.1 -56.8 67 0 SPO 1997 10 17 18 01 82 4.1 -9 672.60 -58.6 -55.0 -56.8 66 -99 SPO 1997 10 17 18 02 83 4.2 -9 672.60 -58.6 -55.0 -56.9 66 -99 SPO 1997 10 17 18 03 85 4.2 -9 672.60 -58.6 -55.0 -56.9 66 -99 SPO 1997 10 17 18 04 85 4.1 -9 672.60 -58.5 -54.8 -56.8 64 -99 SPO 1997 10 17 18 05 87 4.0 -9 672.60 -58.5 -54.9 -56.8 65 -99 SPO 1997 10 17 18 06 89 4.0 -9 672.60 -58.5 -54.9 -56.9 65 -99 SPO 1997 10 17 18 07 90 4.0 -9 672.60 -58.4 -54.9 -57.0 64 -99 SPO 1997 10 17 18 08 88 4.0 -9 672.60 -58.5 -54.9 -56.9 65 -99 SPO 1997 10 17 18 09 87 4.1 -9 672.60 -58.4 -54.8 -56.8 64 -99 SPO 1997 10 17 18 10 87 4.3 -9 672.60 -58.4 -54.6 -56.8 64 -99 SPO 1997 10 17 18 11 85 4.4 -9 672.60 -58.4 -54.6 -56.8 65 -99 SPO 1997 10 17 18 12 84 4.5 -9 672.60 -58.3 -54.5 -56.8 65 -99 SPO 1997 10 17 18 13 84 4.6 -9 672.60 -58.3 -54.5 -56.8 66 -99 SPO 1997 10 17 18 14 83 4.7 -9 672.60 -58.3 -54.5 -56.8 66 -99 SPO 1997 10 17 18 15 83 4.7 -9 672.60 -58.3 -54.5 -56.8 65 -99 SPO 1997 10 17 18 16 84 4.7 -9 672.60 -58.4 -54.5 -56.8 66 -99 SPO 1997 10 17 18 17 85 4.6 -9 672.60 -58.3 -54.5 -56.8 64 -99 SPO 1997 10 17 18 18 85 4.6 -9 672.60 -58.3 -54.5 -56.8 64 -99 SPO 1997 10 17 18 19 84 4.5 -9 672.60 -58.3 -54.5 -56.8 65 -99 SPO 1997 10 17 18 20 82 4.5 -9 672.60 -58.3 -54.5 -56.8 65 -99 SPO 1997 10 17 18 21 81 4.6 -9 672.60 -58.3 -54.5 -56.8 66 -99 SPO 1997 10 17 18 22 80 4.8 -9 672.60 -58.3 -54.5 -56.8 67 -99 SPO 1997 10 17 18 23 78 4.9 -9 672.60 -58.2 -54.5 -56.8 66 -99 SPO 1997 10 17 18 24 78 4.9 -9 672.60 -58.2 -54.5 -56.8 66 -99 SPO 1997 10 17 18 25 77 5.0 -9 672.60 -58.3 -54.5 -56.8 67 -99 SPO 1997 10 17 18 26 77 5.2 -9 672.60 -58.3 -54.4 -56.8 67 -99 SPO 1997 10 17 18 27 76 5.2 -9 672.60 -58.3 -54.4 -56.8 67 -99 SPO 1997 10 17 18 28 75 5.3 -9 672.60 -58.3 -54.4 -56.9 65 -99 SPO 1997 10 17 18 29 74 5.2 -9 672.60 -58.3 -54.5 -57.0 64 -99 SPO 1997 10 17 18 30 74 5.4 -9 672.60 -58.3 -54.4 -57.0 64 -99 SPO 1997 10 17 18 31 73 5.5 -9 672.60 -58.2 -54.4 -57.1 64 -99 SPO 1997 10 17 18 32 73 5.6 -9 672.60 -58.3 -54.3 -57.1 67 -99 SPO 1997 10 17 18 33 73 5.6 -9 672.60 -58.3 -54.3 -57.1 67 -99 SPO 1997 10 17 18 34 73 5.5 -9 672.60 -58.4 -54.3 -57.2 68 -99 SPO 1997 10 17 18 35 75 5.5 -9 672.60 -58.4 -54.2 -57.2 68 -99 SPO 1997 10 17 18 36 76 5.5 -9 672.60 -58.4 -54.2 -57.2 68 -99 SPO 1997 10 17 18 37 76 5.5 -9 672.60 -58.4 -54.2 -57.2 68 -99 SPO 1997 10 17 18 38 76 5.5 -9 672.60 -58.4 -54.2 -57.2 68 -99 SPO 1997 10 17 18 39 76 5.6 -9 672.60 -58.4 -54.2 -57.2 66 -99 SPO 1997 10 17 18 40 75 5.6 -9 672.60 -58.4 -54.1 -57.2 66 -99 SPO 1997 10 17 18 41 74 5.6 -9 672.60 -58.4 -54.1 -57.2 66 -99 SPO 1997 10 17 18 42 73 5.5 -9 672.60 -58.3 -54.1 -57.2 64 -99 SPO 1997 10 17 18 43 74 5.5 -9 672.60 -58.3 -54.1 -57.2 65 -99 SPO 1997 10 17 18 44 74 5.3 -9 672.60 -58.4 -54.1 -57.2 66 -99 SPO 1997 10 17 18 45 75 5.4 -9 672.60 -58.4 -54.2 -57.2 66 -99 SPO 1997 10 17 18 46 76 5.3 -9 672.60 -58.4 -54.2 -57.2 66 -99 SPO 1997 10 17 18 47 76 5.3 -9 672.60 -58.4 -54.2 -57.2 66 -99 SPO 1997 10 17 18 48 75 5.4 -9 672.60 -58.4 -54.3 -57.2 66 -99 SPO 1997 10 17 18 49 75 5.4 -9 672.60 -58.5 -54.3 -57.2 67 -99 SPO 1997 10 17 18 50 75 5.5 -9 672.60 -58.5 -54.3 -57.3 69 -99 SPO 1997 10 17 18 51 75 5.5 -9 672.60 -58.6 -54.3 -57.3 67 -99 SPO 1997 10 17 18 52 74 5.5 -9 672.60 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 53 75 5.5 -9 672.60 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 54 75 5.4 -9 672.50 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 55 74 5.4 -9 672.60 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 56 74 5.4 -9 672.60 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 57 75 5.4 -9 672.60 -58.6 -54.3 -57.4 66 -99 SPO 1997 10 17 18 58 75 5.3 -9 672.60 -58.7 -54.3 -57.4 66 -99 SPO 1997 10 17 18 59 74 5.2 -9 672.60 -58.7 -54.3 -57.4 66 -99 SPO 1997 10 17 19 00 76 5.1 -9 672.60 -58.8 -54.4 -57.5 67 0 SPO 1997 10 17 19 01 77 5.1 -9 672.60 -58.7 -54.5 -57.4 66 -99 SPO 1997 10 17 19 02 77 5.0 -9 672.60 -58.8 -54.6 -57.4 67 -99 SPO 1997 10 17 19 03 78 5.0 -9 672.60 -58.9 -54.7 -57.4 67 -99 SPO 1997 10 17 19 04 78 5.0 -9 672.60 -58.9 -54.7 -57.4 66 -99 SPO 1997 10 17 19 05 78 4.9 -9 672.60 -58.9 -54.7 -57.4 65 -99 SPO 1997 10 17 19 06 77 4.9 -9 672.60 -58.9 -54.7 -57.4 65 -99 SPO 1997 10 17 19 07 76 5.0 -9 672.60 -58.9 -54.8 -57.4 65 -99 SPO 1997 10 17 19 08 75 5.0 -9 672.60 -58.9 -54.8 -57.5 65 -99 SPO 1997 10 17 19 09 74 5.1 -9 672.60 -58.9 -54.8 -57.5 66 -99 SPO 1997 10 17 19 10 73 5.1 -9 672.60 -58.9 -54.7 -57.5 66 -99 SPO 1997 10 17 19 11 73 5.1 -9 672.50 -58.9 -54.8 -57.6 66 -99 SPO 1997 10 17 19 12 72 5.0 -9 672.60 -58.9 -54.8 -57.6 66 -99 SPO 1997 10 17 19 13 73 5.0 -9 672.60 -58.9 -54.8 -57.6 66 -99 SPO 1997 10 17 19 14 73 4.9 -9 672.60 -58.9 -54.8 -57.5 66 -99 SPO 1997 10 17 19 15 76 4.8 -9 672.60 -58.9 -54.8 -57.4 66 -99 SPO 1997 10 17 19 16 79 4.6 -9 672.60 -58.9 -55.0 -57.3 65 -99 SPO 1997 10 17 19 17 81 4.4 -9 672.60 -59.0 -55.1 -57.3 65 -99 SPO 1997 10 17 19 18 81 4.4 -9 672.60 -59.2 -55.2 -57.3 66 -99 SPO 1997 10 17 19 19 81 4.5 -9 672.60 -59.2 -55.2 -57.4 66 -99 SPO 1997 10 17 19 20 80 4.5 -9 672.60 -59.2 -55.0 -57.5 66 -99 SPO 1997 10 17 19 21 80 4.5 -9 672.60 -59.2 -55.0 -57.5 66 -99 SPO 1997 10 17 19 22 82 4.5 -9 672.60 -59.2 -55.0 -57.5 65 -99 SPO 1997 10 17 19 23 83 4.5 -9 672.60 -59.2 -55.0 -57.5 65 -99 SPO 1997 10 17 19 24 83 4.5 -9 672.60 -59.3 -55.0 -57.5 65 -99 SPO 1997 10 17 19 25 83 4.5 -9 672.60 -59.2 -55.1 -57.4 65 -99 SPO 1997 10 17 19 26 83 4.6 -9 672.60 -59.2 -55.2 -57.4 65 -99 SPO 1997 10 17 19 27 83 4.6 -9 672.60 -59.2 -55.2 -57.4 65 -99 SPO 1997 10 17 19 28 83 4.6 -9 672.60 -59.2 -55.2 -57.3 64 -99 SPO 1997 10 17 19 29 83 4.7 -9 672.60 -59.1 -55.2 -57.3 63 -99 SPO 1997 10 17 19 30 82 4.8 -9 672.60 -59.0 -55.2 -57.3 62 -99 SPO 1997 10 17 19 31 82 4.8 -9 672.60 -58.9 -55.1 -57.2 61 -99 SPO 1997 10 17 19 32 83 4.8 -9 672.60 -58.8 -55.1 -57.2 61 -99 SPO 1997 10 17 19 33 83 4.8 -9 672.60 -58.8 -55.1 -57.2 62 -99 SPO 1997 10 17 19 34 83 4.8 -9 672.60 -58.7 -55.0 -57.2 63 -99 SPO 1997 10 17 19 35 83 4.7 -9 672.60 -58.6 -55.1 -57.1 63 -99 SPO 1997 10 17 19 36 84 4.8 -9 672.60 -58.7 -55.0 -57.1 65 -99 SPO 1997 10 17 19 37 83 4.8 -9 672.60 -58.7 -54.9 -57.1 65 -99 SPO 1997 10 17 19 38 82 4.8 -9 672.60 -58.6 -54.9 -57.0 64 -99 SPO 1997 10 17 19 39 84 4.7 -9 672.70 -58.6 -54.8 -57.0 65 -99 SPO 1997 10 17 19 40 85 4.8 -9 672.60 -58.5 -54.8 -56.9 64 -99 SPO 1997 10 17 19 41 84 4.6 -9 672.70 -58.5 -54.8 -56.9 63 -99 SPO 1997 10 17 19 42 83 4.6 -9 672.70 -58.4 -54.7 -56.8 62 -99 SPO 1997 10 17 19 43 83 4.6 -9 672.70 -58.4 -54.7 -56.8 62 -99 SPO 1997 10 17 19 44 82 4.5 -9 672.70 -58.4 -54.6 -56.8 63 -99 SPO 1997 10 17 19 45 82 4.5 -9 672.70 -58.4 -54.6 -56.7 64 -99 SPO 1997 10 17 19 46 84 4.4 -9 672.70 -58.4 -54.7 -56.7 64 -99 SPO 1997 10 17 19 47 85 4.3 -9 672.70 -58.5 -54.8 -56.8 65 -99 SPO 1997 10 17 19 48 84 4.3 -9 672.70 -58.6 -55.0 -56.8 66 -99 SPO 1997 10 17 19 49 83 4.3 -9 672.70 -58.7 -55.0 -56.8 67 -99 SPO 1997 10 17 19 50 83 4.3 -9 672.70 -58.8 -55.0 -56.9 68 -99 SPO 1997 10 17 19 51 81 4.3 -9 672.70 -58.8 -54.9 -56.9 68 -99 SPO 1997 10 17 19 52 80 4.3 -9 672.80 -58.8 -54.9 -56.9 67 -99 SPO 1997 10 17 19 53 80 4.3 -9 672.80 -58.7 -55.0 -56.9 65 -99 SPO 1997 10 17 19 54 80 4.2 -9 672.70 -58.7 -55.0 -56.9 65 -99 SPO 1997 10 17 19 55 79 4.2 -9 672.70 -58.8 -55.0 -56.9 65 -99 SPO 1997 10 17 19 56 80 4.2 -9 672.70 -58.8 -55.1 -56.9 65 -99 SPO 1997 10 17 19 57 80 4.2 -9 672.70 -58.8 -55.1 -56.9 65 -99 SPO 1997 10 17 19 58 79 4.2 -9 672.70 -58.9 -55.0 -56.9 67 -99 SPO 1997 10 17 19 59 79 4.3 -9 672.70 -58.8 -55.1 -56.9 66 -99 SPO 1997 10 17 20 00 79 4.3 -9 672.80 -58.8 -55.2 -56.9 66 0 SPO 1997 10 17 20 01 78 4.3 -9 672.70 -58.8 -55.3 -56.9 67 -99 SPO 1997 10 17 20 02 77 4.4 -9 672.70 -58.8 -55.4 -56.9 67 -99 SPO 1997 10 17 20 03 78 4.6 -9 672.70 -58.8 -55.4 -57.0 68 -99 SPO 1997 10 17 20 04 77 4.7 -9 672.70 -58.8 -55.2 -56.9 69 -99 SPO 1997 10 17 20 05 75 4.7 -9 672.70 -58.8 -55.0 -57.0 69 -99 SPO 1997 10 17 20 06 75 4.8 -9 672.70 -58.7 -54.9 -57.1 68 -99 SPO 1997 10 17 20 07 73 4.7 -9 672.70 -58.6 -54.8 -57.1 67 -99 SPO 1997 10 17 20 08 74 4.7 -9 672.70 -58.6 -54.7 -57.2 68 -99 SPO 1997 10 17 20 09 75 4.6 -9 672.70 -58.5 -54.6 -57.1 67 -99 SPO 1997 10 17 20 10 76 4.5 -9 672.70 -58.5 -54.6 -57.0 69 -99 SPO 1997 10 17 20 11 76 4.5 -9 672.70 -58.5 -54.9 -56.8 70 -99 SPO 1997 10 17 20 12 78 4.5 -9 672.70 -58.5 -55.0 -56.8 71 -99 SPO 1997 10 17 20 13 78 4.6 -9 672.70 -58.5 -55.2 -56.8 71 -99 SPO 1997 10 17 20 14 77 4.6 -9 672.70 -58.5 -55.2 -56.8 71 -99 SPO 1997 10 17 20 15 77 4.8 -9 672.70 -58.5 -55.0 -56.8 71 -99 SPO 1997 10 17 20 16 75 4.8 -9 672.70 -58.5 -54.8 -57.0 72 -99 SPO 1997 10 17 20 17 74 4.8 -9 672.70 -58.5 -54.8 -57.1 72 -99 SPO 1997 10 17 20 18 75 4.9 -9 672.70 -58.4 -54.7 -57.1 71 -99 SPO 1997 10 17 20 19 74 4.9 -9 672.70 -58.4 -54.8 -57.1 70 -99 SPO 1997 10 17 20 20 74 4.9 -9 672.70 -58.4 -54.8 -57.1 70 -99 SPO 1997 10 17 20 21 74 4.9 -9 672.70 -58.4 -54.9 -57.2 70 -99 SPO 1997 10 17 20 22 73 4.8 -9 672.70 -58.4 -54.9 -57.2 70 -99 SPO 1997 10 17 20 23 73 4.8 -9 672.70 -58.4 -54.9 -57.2 70 -99 SPO 1997 10 17 20 24 74 4.8 -9 672.80 -58.5 -55.0 -57.1 72 -99 SPO 1997 10 17 20 25 74 4.7 -9 672.80 -58.5 -55.0 -57.1 72 -99 SPO 1997 10 17 20 26 75 4.7 -9 672.80 -58.5 -55.0 -57.1 72 -99 SPO 1997 10 17 20 27 77 4.9 -9 672.80 -58.5 -55.2 -57.1 72 -99 SPO 1997 10 17 20 28 76 4.8 -9 672.80 -58.6 -55.2 -57.1 73 -99 SPO 1997 10 17 20 29 75 4.8 -9 672.80 -58.6 -55.3 -57.2 73 -99 SPO 1997 10 17 20 30 74 4.9 -9 672.80 -58.6 -55.2 -57.3 72 -99 SPO 1997 10 17 20 31 74 4.8 -9 672.80 -58.5 -55.0 -57.3 71 -99 SPO 1997 10 17 20 32 75 4.8 -9 672.80 -58.5 -54.8 -57.3 71 -99 SPO 1997 10 17 20 33 76 4.8 -9 672.80 -58.5 -54.7 -57.2 70 -99 SPO 1997 10 17 20 34 75 4.7 -9 672.80 -58.4 -54.6 -57.2 69 -99 SPO 1997 10 17 20 35 75 4.7 -9 672.80 -58.4 -54.6 -57.2 69 -99 SPO 1997 10 17 20 36 75 4.6 -9 672.70 -58.5 -54.3 -57.2 70 -99 SPO 1997 10 17 20 37 72 4.4 -9 672.70 -58.5 -54.3 -57.3 70 -99 SPO 1997 10 17 20 38 71 4.4 -9 672.70 -58.5 -54.4 -57.4 71 -99 SPO 1997 10 17 20 39 71 4.5 -9 672.70 -58.5 -54.4 -57.4 71 -99 SPO 1997 10 17 20 40 71 4.6 -9 672.70 -58.5 -54.3 -57.4 71 -99 SPO 1997 10 17 20 41 72 4.7 -9 672.70 -58.5 -54.3 -57.4 72 -99 SPO 1997 10 17 20 42 71 4.7 -9 672.70 -58.6 -54.2 -57.4 72 -99 SPO 1997 10 17 20 43 73 4.6 -9 672.70 -58.6 -54.2 -57.4 72 -99 SPO 1997 10 17 20 44 73 4.5 -9 672.70 -58.6 -54.4 -57.4 71 -99 SPO 1997 10 17 20 45 74 4.9 -9 672.70 -58.6 -54.4 -57.4 70 -99 SPO 1997 10 17 20 46 74 5.0 -9 672.60 -58.6 -54.4 -57.4 70 -99 SPO 1997 10 17 20 47 74 5.1 -9 672.60 -58.6 -54.3 -57.5 70 -99 SPO 1997 10 17 20 48 74 5.1 -9 672.60 -58.6 -54.3 -57.5 70 -99 SPO 1997 10 17 20 49 73 5.0 -9 672.60 -58.6 -54.3 -57.5 70 -99 SPO 1997 10 17 20 50 75 4.9 -9 672.70 -58.6 -54.3 -57.5 71 -99 SPO 1997 10 17 20 51 75 4.9 -9 672.70 -58.6 -54.4 -57.4 71 -99 SPO 1997 10 17 20 52 75 4.9 -9 672.70 -58.6 -54.4 -57.4 71 -99 SPO 1997 10 17 20 53 74 4.9 -9 672.70 -58.6 -54.4 -57.5 70 -99 SPO 1997 10 17 20 54 73 4.9 -9 672.70 -58.6 -54.5 -57.6 70 -99 SPO 1997 10 17 20 55 72 5.1 -9 672.60 -58.7 -54.5 -57.7 69 -99 SPO 1997 10 17 20 56 71 5.1 -9 672.60 -58.7 -54.5 -57.8 68 -99 SPO 1997 10 17 20 57 71 5.1 -9 672.70 -58.7 -54.5 -57.8 67 -99 SPO 1997 10 17 20 58 71 5.0 -9 672.80 -58.7 -54.5 -57.8 67 -99 SPO 1997 10 17 20 59 71 5.1 -9 672.80 -58.8 -54.6 -57.8 68 -99 SPO 1997 10 17 21 00 71 5.1 -9 672.80 -58.7 -54.5 -57.8 67 0 SPO 1997 10 17 21 01 69 5.0 -9 672.80 -58.8 -54.5 -57.9 69 -99 SPO 1997 10 17 21 02 68 5.1 -9 672.80 -58.8 -54.4 -57.9 69 -99 SPO 1997 10 17 21 03 66 5.1 -9 672.80 -58.8 -54.4 -57.9 69 -99 SPO 1997 10 17 21 04 65 5.3 -9 672.80 -58.7 -54.4 -57.8 68 -99 SPO 1997 10 17 21 05 65 5.4 -9 672.70 -58.6 -54.3 -57.8 67 -99 SPO 1997 10 17 21 06 64 5.4 -9 672.70 -58.6 -54.2 -57.8 68 -99 SPO 1997 10 17 21 07 63 5.4 -9 672.70 -58.6 -54.2 -57.8 67 -99 SPO 1997 10 17 21 08 63 5.5 -9 672.70 -58.6 -54.1 -57.8 67 -99 SPO 1997 10 17 21 09 63 5.5 -9 672.70 -58.5 -54.0 -57.8 66 -99 SPO 1997 10 17 21 10 62 5.6 -9 672.70 -58.5 -53.9 -57.8 66 -99 SPO 1997 10 17 21 11 62 5.6 -9 672.70 -58.5 -53.7 -57.8 66 -99 SPO 1997 10 17 21 12 62 5.7 -9 672.70 -58.5 -53.6 -57.8 67 -99 SPO 1997 10 17 21 13 61 5.8 -9 672.70 -58.5 -53.4 -57.8 69 -99 SPO 1997 10 17 21 14 60 5.8 -9 672.70 -58.5 -53.4 -57.8 70 -99 SPO 1997 10 17 21 15 61 5.9 -9 672.70 -58.5 -53.3 -57.8 70 -99 SPO 1997 10 17 21 16 60 6.0 -9 672.60 -58.5 -53.1 -57.8 70 -99 SPO 1997 10 17 21 17 59 6.0 -9 672.60 -58.5 -53.2 -57.8 70 -99 SPO 1997 10 17 21 18 58 6.2 -9 672.60 -58.5 -53.1 -57.8 69 -99 SPO 1997 10 17 21 19 58 6.2 -9 672.60 -58.4 -53.0 -57.8 66 -99 SPO 1997 10 17 21 20 58 6.1 -9 672.60 -58.4 -53.0 -57.8 66 -99 SPO 1997 10 17 21 21 58 6.1 -9 672.60 -58.4 -53.0 -57.8 66 -99 SPO 1997 10 17 21 22 58 6.2 -9 672.60 -58.4 -53.0 -57.8 66 -99 SPO 1997 10 17 21 23 58 6.2 -9 672.70 -58.4 -53.0 -57.8 66 -99 SPO 1997 10 17 21 24 59 6.3 -9 672.70 -58.4 -53.0 -57.9 68 -99 SPO 1997 10 17 21 25 60 6.2 -9 672.70 -58.4 -53.0 -57.9 69 -99 SPO 1997 10 17 21 26 61 6.1 -9 672.70 -58.4 -53.0 -57.9 69 -99 SPO 1997 10 17 21 27 63 6.1 -9 672.70 -58.4 -53.0 -57.9 69 -99 SPO 1997 10 17 21 28 64 6.0 -9 672.70 -58.4 -53.0 -57.9 69 -99 SPO 1997 10 17 21 29 63 5.9 -9 672.70 -58.4 -53.2 -57.9 70 -99 SPO 1997 10 17 21 30 63 5.9 -9 672.70 -58.4 -53.2 -57.9 70 -99 SPO 1997 10 17 21 31 62 5.8 -9 672.70 -58.4 -53.3 -57.9 70 -99 SPO 1997 10 17 21 32 62 5.9 -9 672.70 -58.4 -53.3 -58.0 70 -99 SPO 1997 10 17 21 33 61 5.9 -9 672.70 -58.4 -53.4 -58.0 69 -99 SPO 1997 10 17 21 34 60 6.1 -9 672.70 -58.4 -53.2 -58.0 69 -99 SPO 1997 10 17 21 35 60 6.1 -9 672.70 -58.4 -53.2 -58.0 69 -99 SPO 1997 10 17 21 36 59 6.1 -9 672.70 -58.4 -53.1 -58.0 69 -99 SPO 1997 10 17 21 37 58 6.2 -9 672.70 -58.3 -53.1 -57.9 68 -99 SPO 1997 10 17 21 38 57 6.2 -9 672.70 -58.3 -53.1 -57.9 68 -99 SPO 1997 10 17 21 39 56 6.4 -9 672.60 -58.3 -53.0 -57.9 68 -99 SPO 1997 10 17 21 40 56 6.5 -9 672.60 -58.2 -52.9 -57.9 68 -99 SPO 1997 10 17 21 41 55 6.5 -9 672.60 -58.2 -52.9 -57.8 68 -99 SPO 1997 10 17 21 42 54 6.5 -9 672.60 -58.1 -52.8 -57.8 67 -99 SPO 1997 10 17 21 43 55 6.6 -9 672.60 -58.1 -52.8 -57.7 66 -99 SPO 1997 10 17 21 44 54 6.5 -9 672.60 -58.1 -52.9 -57.7 66 -99 SPO 1997 10 17 21 45 54 6.3 -9 672.60 -58.0 -52.9 -57.6 66 -99 SPO 1997 10 17 21 46 55 6.1 -9 672.60 -58.0 -53.0 -57.7 66 -99 SPO 1997 10 17 21 47 55 5.8 -9 672.60 -58.0 -53.1 -57.6 67 -99 SPO 1997 10 17 21 48 56 5.7 -9 672.60 -58.0 -53.1 -57.6 68 -99 SPO 1997 10 17 21 49 56 5.6 -9 672.70 -58.0 -53.2 -57.6 68 -99 SPO 1997 10 17 21 50 55 5.6 -9 672.60 -58.1 -53.2 -57.7 70 -99 SPO 1997 10 17 21 51 54 5.7 -9 672.60 -58.1 -53.2 -57.7 70 -99 SPO 1997 10 17 21 52 54 5.7 -9 672.60 -58.1 -53.1 -57.7 70 -99 SPO 1997 10 17 21 53 54 5.8 -9 672.60 -58.0 -53.0 -57.7 69 -99 SPO 1997 10 17 21 54 54 5.9 -9 672.60 -58.0 -53.0 -57.7 69 -99 SPO 1997 10 17 21 55 54 5.8 -9 672.60 -58.0 -53.0 -57.7 68 -99 SPO 1997 10 17 21 56 56 5.7 -9 672.60 -58.0 -53.0 -57.6 68 -99 SPO 1997 10 17 21 57 57 5.5 -9 672.70 -58.0 -53.1 -57.6 68 -99 SPO 1997 10 17 21 58 59 5.3 -9 672.70 -58.0 -53.2 -57.5 67 -99 SPO 1997 10 17 21 59 59 5.1 -9 672.70 -58.0 -53.2 -57.5 67 -99 SPO 1997 10 17 22 00 60 5.2 -9 672.70 -58.1 -53.3 -57.5 69 0 SPO 1997 10 17 22 01 60 5.3 -9 672.70 -58.2 -53.3 -57.5 70 -99 SPO 1997 10 17 22 02 60 5.2 -9 672.70 -58.2 -53.4 -57.5 70 -99 SPO 1997 10 17 22 03 60 5.2 -9 672.70 -58.2 -53.4 -57.5 70 -99 SPO 1997 10 17 22 04 61 5.1 -9 672.70 -58.2 -53.3 -57.5 71 -99 SPO 1997 10 17 22 05 60 4.8 -9 672.70 -58.4 -53.5 -57.5 72 -99 SPO 1997 10 17 22 06 63 5.3 -9 672.70 -58.3 -53.6 -57.4 70 -99 SPO 1997 10 17 22 07 63 5.2 -9 672.70 -58.3 -53.5 -57.4 69 -99 SPO 1997 10 17 22 08 64 5.2 -9 672.70 -58.4 -53.6 -57.4 69 -99 SPO 1997 10 17 22 09 64 5.1 -9 672.70 -58.4 -53.6 -57.4 69 -99 SPO 1997 10 17 22 10 63 4.9 -9 672.70 -58.4 -53.6 -57.4 69 -99 SPO 1997 10 17 22 11 64 5.1 -9 672.70 -58.4 -53.6 -57.4 69 -99 SPO 1997 10 17 22 12 64 5.0 -9 672.70 -58.4 -53.5 -57.4 70 -99 SPO 1997 10 17 22 13 65 4.9 -9 672.70 -58.4 -53.6 -57.4 70 -99 SPO 1997 10 17 22 14 66 4.8 -9 672.70 -58.5 -53.7 -57.4 71 -99 SPO 1997 10 17 22 15 68 5.2 -9 672.70 -58.4 -53.7 -57.4 69 -99 SPO 1997 10 17 22 16 68 5.3 -9 672.70 -58.4 -53.4 -57.3 69 -99 SPO 1997 10 17 22 17 69 5.3 -9 672.70 -58.5 -53.6 -57.3 69 -99 SPO 1997 10 17 22 18 67 5.0 -9 672.70 -58.5 -53.7 -57.4 69 -99 SPO 1997 10 17 22 19 67 5.3 -9 672.70 -58.6 -53.8 -57.4 68 -99 SPO 1997 10 17 22 20 67 5.4 -9 672.70 -58.6 -53.8 -57.4 67 -99 SPO 1997 10 17 22 21 67 5.5 -9 672.70 -58.6 -53.8 -57.4 67 -99 SPO 1997 10 17 22 22 66 5.5 -9 672.70 -58.6 -53.7 -57.4 67 -99 SPO 1997 10 17 22 23 65 5.2 -9 672.70 -58.6 -53.9 -57.5 68 -99 SPO 1997 10 17 22 24 66 5.2 -9 672.70 -58.6 -54.0 -57.5 70 -99 SPO 1997 10 17 22 25 67 5.4 -9 672.70 -58.6 -53.9 -57.4 70 -99 SPO 1997 10 17 22 26 68 5.3 -9 672.70 -58.6 -53.8 -57.4 70 -99 SPO 1997 10 17 22 27 69 5.2 -9 672.70 -58.5 -53.9 -57.4 69 -99 SPO 1997 10 17 22 28 70 5.0 -9 672.80 -58.5 -54.0 -57.4 70 -99 SPO 1997 10 17 22 29 70 5.1 -9 672.70 -58.6 -54.0 -57.4 70 -99 SPO 1997 10 17 22 30 70 5.4 -9 672.80 -58.6 -53.9 -57.5 70 -99 SPO 1997 10 17 22 31 70 5.3 -9 672.80 -58.6 -53.9 -57.7 68 -99 SPO 1997 10 17 22 32 70 5.5 -9 672.80 -58.6 -53.8 -57.8 68 -99 SPO 1997 10 17 22 33 69 5.1 -9 672.80 -58.6 -53.8 -57.8 67 -99 SPO 1997 10 17 22 34 68 5.5 -9 672.80 -58.6 -53.9 -57.8 68 -99 SPO 1997 10 17 22 35 68 5.2 -9 672.80 -58.5 -53.8 -57.8 69 -99 SPO 1997 10 17 22 36 69 5.0 -9 672.80 -58.6 -53.9 -57.8 70 -99 SPO 1997 10 17 22 37 69 5.0 -9 672.80 -58.6 -53.9 -57.8 70 -99 SPO 1997 10 17 22 38 70 5.1 -9 672.80 -58.5 -53.9 -57.6 69 -99 SPO 1997 10 17 22 39 70 5.3 -9 672.80 -58.5 -53.9 -57.5 69 -99 SPO 1997 10 17 22 40 69 5.3 -9 672.80 -58.5 -53.8 -57.5 70 -99 SPO 1997 10 17 22 41 67 5.3 -9 672.80 -58.6 -53.8 -57.4 71 -99 SPO 1997 10 17 22 42 67 5.4 -9 672.80 -58.6 -53.9 -57.5 71 -99 SPO 1997 10 17 22 43 66 5.5 -9 672.80 -58.6 -53.9 -57.5 70 -99 SPO 1997 10 17 22 44 66 5.4 -9 672.80 -58.6 -53.9 -57.5 68 -99 SPO 1997 10 17 22 45 68 5.2 -9 672.90 -58.5 -53.9 -57.5 66 -99 SPO 1997 10 17 22 46 69 5.0 -9 672.90 -58.5 -54.0 -57.4 66 -99 SPO 1997 10 17 22 47 69 4.8 -9 672.90 -58.5 -54.1 -57.4 67 -99 SPO 1997 10 17 22 48 71 4.7 -9 672.90 -58.5 -54.1 -57.3 67 -99 SPO 1997 10 17 22 49 71 4.7 -9 672.90 -58.5 -54.2 -57.3 67 -99 SPO 1997 10 17 22 50 70 4.9 -9 672.90 -58.6 -54.3 -57.4 70 -99 SPO 1997 10 17 22 51 69 5.2 -9 672.90 -58.6 -54.2 -57.5 70 -99 SPO 1997 10 17 22 52 68 5.4 -9 672.90 -58.6 -54.0 -57.6 70 -99 SPO 1997 10 17 22 53 67 5.5 -9 672.90 -58.5 -53.9 -57.8 70 -99 SPO 1997 10 17 22 54 67 5.5 -9 672.80 -58.5 -53.9 -57.9 70 -99 SPO 1997 10 17 22 55 67 5.4 -9 672.80 -58.5 -53.9 -57.9 70 -99 SPO 1997 10 17 22 56 66 5.4 -9 672.80 -58.4 -53.9 -57.9 69 -99 SPO 1997 10 17 22 57 66 5.5 -9 672.80 -58.4 -53.9 -57.9 69 -99 SPO 1997 10 17 22 58 65 5.5 -9 672.80 -58.4 -53.8 -57.9 68 -99 SPO 1997 10 17 22 59 66 5.7 -9 672.80 -58.4 -53.8 -57.9 68 -99 SPO 1997 10 17 23 00 66 5.9 -9 672.80 -58.4 -53.7 -57.8 68 0 SPO 1997 10 17 23 01 65 5.9 -9 672.80 -58.4 -53.6 -57.7 68 -99 SPO 1997 10 17 23 02 66 6.0 -9 672.80 -58.4 -53.4 -57.6 68 -99 SPO 1997 10 17 23 03 65 6.0 -9 672.80 -58.3 -53.4 -57.5 68 -99 SPO 1997 10 17 23 04 65 5.8 -9 672.90 -58.3 -53.3 -57.5 68 -99 SPO 1997 10 17 23 05 64 5.6 -9 672.90 -58.3 -53.4 -57.4 68 -99 SPO 1997 10 17 23 06 64 5.5 -9 672.90 -58.3 -53.5 -57.4 69 -99 SPO 1997 10 17 23 07 64 5.5 -9 672.90 -58.2 -53.6 -57.4 67 -99 SPO 1997 10 17 23 08 63 5.6 -9 672.90 -58.2 -53.6 -57.4 66 -99 SPO 1997 10 17 23 09 63 5.7 -9 672.90 -58.2 -53.5 -57.4 66 -99 SPO 1997 10 17 23 10 63 5.8 -9 672.90 -58.2 -53.5 -57.4 66 -99 SPO 1997 10 17 23 11 63 5.8 -9 672.90 -58.2 -53.5 -57.4 67 -99 SPO 1997 10 17 23 12 63 5.6 -9 672.80 -58.3 -53.5 -57.4 69 -99 SPO 1997 10 17 23 13 63 5.6 -9 672.90 -58.3 -53.5 -57.5 70 -99 SPO 1997 10 17 23 14 64 5.5 -9 672.90 -58.2 -53.6 -57.7 70 -99 SPO 1997 10 17 23 15 64 5.6 -9 672.90 -58.2 -53.6 -57.8 70 -99 SPO 1997 10 17 23 16 64 5.5 -9 672.90 -58.2 -53.6 -57.9 70 -99 SPO 1997 10 17 23 17 63 5.5 -9 672.90 -58.2 -53.7 -57.9 70 -99 SPO 1997 10 17 23 18 64 5.6 -9 672.90 -58.2 -53.7 -57.8 70 -99 SPO 1997 10 17 23 19 65 5.6 -9 672.90 -58.2 -53.8 -57.6 70 -99 SPO 1997 10 17 23 20 65 5.6 -9 672.90 -58.2 -53.8 -57.4 70 -99 SPO 1997 10 17 23 21 65 5.5 -9 672.90 -58.2 -53.9 -57.4 69 -99 SPO 1997 10 17 23 22 66 5.4 -9 672.90 -58.2 -54.0 -57.3 68 -99 SPO 1997 10 17 23 23 66 5.4 -9 672.90 -58.2 -54.0 -57.3 66 -99 SPO 1997 10 17 23 24 66 5.3 -9 672.90 -58.2 -54.1 -57.3 66 -99 SPO 1997 10 17 23 25 66 5.4 -9 672.90 -58.2 -54.1 -57.3 67 -99 SPO 1997 10 17 23 26 66 5.4 -9 672.90 -58.2 -54.1 -57.3 67 -99 SPO 1997 10 17 23 27 66 5.3 -9 672.90 -58.3 -54.1 -57.3 69 -99 SPO 1997 10 17 23 28 65 5.3 -9 672.90 -58.3 -54.1 -57.3 69 -99 SPO 1997 10 17 23 29 65 5.4 -9 672.90 -58.3 -54.0 -57.3 70 -99 SPO 1997 10 17 23 30 65 5.3 -9 672.90 -58.4 -54.0 -57.4 71 -99 SPO 1997 10 17 23 31 65 5.4 -9 672.90 -58.3 -54.0 -57.6 70 -99 SPO 1997 10 17 23 32 64 5.3 -9 672.90 -58.4 -54.0 -57.8 70 -99 SPO 1997 10 17 23 33 64 5.3 -9 672.90 -58.4 -54.1 -57.9 70 -99 SPO 1997 10 17 23 34 63 5.3 -9 672.90 -58.4 -54.0 -57.7 69 -99 SPO 1997 10 17 23 35 64 5.2 -9 672.90 -58.4 -54.0 -57.6 69 -99 SPO 1997 10 17 23 36 65 5.2 -9 673.00 -58.5 -54.0 -57.5 69 -99 SPO 1997 10 17 23 37 66 5.1 -9 673.00 -58.5 -54.0 -57.5 69 -99 SPO 1997 10 17 23 38 67 5.1 -9 672.90 -58.4 -54.1 -57.5 68 -99 SPO 1997 10 17 23 39 68 5.0 -9 672.90 -58.5 -54.2 -57.5 69 -99 SPO 1997 10 17 23 40 68 4.9 -9 673.00 -58.5 -54.3 -57.5 69 -99 SPO 1997 10 17 23 41 68 5.0 -9 673.00 -58.6 -54.3 -57.5 70 -99 SPO 1997 10 17 23 42 68 5.0 -9 672.90 -58.6 -54.3 -57.5 68 -99 SPO 1997 10 17 23 43 67 5.0 -9 672.90 -58.7 -54.4 -57.6 69 -99 SPO 1997 10 17 23 44 67 5.0 -9 673.00 -58.7 -54.4 -57.8 68 -99 SPO 1997 10 17 23 45 66 5.0 -9 673.00 -58.7 -54.3 -57.8 68 -99 SPO 1997 10 17 23 46 66 5.1 -9 673.00 -58.7 -54.3 -57.6 67 -99 SPO 1997 10 17 23 47 65 5.1 -9 673.00 -58.7 -54.2 -57.6 67 -99 SPO 1997 10 17 23 48 64 5.2 -9 673.00 -58.7 -54.2 -57.6 66 -99 SPO 1997 10 17 23 49 64 5.4 -9 673.00 -58.7 -54.2 -57.6 66 -99 SPO 1997 10 17 23 50 64 5.5 -9 672.90 -58.7 -54.2 -57.6 67 -99 SPO 1997 10 17 23 51 64 5.3 -9 673.00 -58.8 -54.1 -57.6 69 -99 SPO 1997 10 17 23 52 64 5.3 -9 673.00 -58.7 -54.0 -57.6 68 -99 SPO 1997 10 17 23 53 64 5.3 -9 672.90 -58.7 -54.0 -57.5 68 -99 SPO 1997 10 17 23 54 65 5.3 -9 673.00 -58.7 -54.0 -57.5 68 -99 SPO 1997 10 17 23 55 66 5.4 -9 673.00 -58.7 -54.0 -57.5 68 -99 SPO 1997 10 17 23 56 67 5.4 -9 673.00 -58.7 -54.0 -57.5 68 -99 SPO 1997 10 17 23 57 67 5.2 -9 673.00 -58.7 -54.0 -57.5 69 -99 SPO 1997 10 17 23 58 67 5.2 -9 673.00 -58.7 -54.1 -57.5 -99 -99 SPO 1997 10 17 23 59 67 5.3 -9 673.00 -58.7 -54.1 -57.5 -99 -99 SPO 1997 10 18 00 00 66 5.3 -9 673.10 -58.7 -54.1 -57.5 -99 0 SPO 1997 10 18 00 01 65 5.3 -9 673.00 -58.8 -54.0 -57.5 -99 -99 SPO 1997 10 18 00 02 64 5.3 -9 672.90 -58.8 -54.0 -57.5 -99 -99 SPO 1997 10 18 00 03 64 5.2 -9 672.90 -58.8 -54.0 -57.5 69 -99 SPO 1997 10 18 00 04 63 5.0 -9 672.90 -58.7 -54.0 -57.5 68 -99 SPO 1997 10 18 00 05 63 4.9 -9 672.90 -58.7 -54.0 -57.4 68 -99 SPO 1997 10 18 00 06 63 4.9 -9 672.90 -58.7 -54.0 -57.4 69 -99 SPO 1997 10 18 00 07 63 4.9 -9 672.90 -58.6 -53.9 -57.4 68 -99 SPO 1997 10 18 00 08 63 4.9 -9 673.00 -58.6 -53.9 -57.4 68 -99 SPO 1997 10 18 00 09 62 5.0 -9 673.00 -58.6 -53.9 -57.4 68 -99 SPO 1997 10 18 00 10 63 5.2 -9 672.90 -58.6 -53.8 -57.4 67 -99 SPO 1997 10 18 00 11 63 5.2 -9 672.90 -58.6 -53.8 -57.4 66 -99 SPO 1997 10 18 00 12 64 5.1 -9 672.90 -58.6 -53.8 -57.4 66 -99 SPO 1997 10 18 00 13 64 5.0 -9 673.00 -58.6 -53.8 -57.4 67 -99 SPO 1997 10 18 00 14 64 4.7 -9 673.00 -58.6 -54.0 -57.5 68 -99 SPO 1997 10 18 00 15 66 4.5 -9 673.00 -58.6 -54.1 -57.6 68 -99 SPO 1997 10 18 00 16 66 4.4 -9 673.00 -58.6 -54.2 -57.4 70 -99 SPO 1997 10 18 00 17 67 4.4 -9 673.00 -58.6 -54.2 -57.3 70 -99 SPO 1997 10 18 00 18 67 4.5 -9 673.00 -58.7 -54.3 -57.4 71 -99 SPO 1997 10 18 00 19 68 4.6 -9 673.00 -58.7 -54.3 -57.4 71 -99 SPO 1997 10 18 00 20 68 4.5 -9 673.00 -58.7 -54.3 -57.6 71 -99 SPO 1997 10 18 00 21 68 4.3 -9 673.00 -58.8 -54.4 -57.8 72 -99 SPO 1997 10 18 00 22 68 4.3 -9 673.10 -58.8 -54.5 -57.9 72 -99 SPO 1997 10 18 00 23 68 4.3 -9 673.10 -58.8 -54.5 -57.9 69 -99 SPO 1997 10 18 00 24 69 4.3 -9 673.10 -58.8 -54.5 -57.8 69 -99 SPO 1997 10 18 00 25 69 4.3 -9 673.10 -58.7 -54.5 -57.6 67 -99 SPO 1997 10 18 00 26 70 4.4 -9 673.00 -58.8 -54.5 -57.4 68 -99 SPO 1997 10 18 00 27 69 4.3 -9 673.10 -58.7 -54.5 -57.2 67 -99 SPO 1997 10 18 00 28 68 4.4 -9 673.10 -58.7 -54.5 -57.2 67 -99 SPO 1997 10 18 00 29 68 4.5 -9 673.10 -58.7 -54.5 -57.2 67 -99 SPO 1997 10 18 00 30 69 4.5 -9 673.00 -58.7 -54.6 -57.3 68 -99 SPO 1997 10 18 00 31 68 4.5 -9 673.00 -58.7 -54.5 -57.3 68 -99 SPO 1997 10 18 00 32 68 4.5 -9 673.00 -58.7 -54.5 -57.3 68 -99 SPO 1997 10 18 00 33 67 4.6 -9 673.00 -58.7 -54.4 -57.3 68 -99 SPO 1997 10 18 00 34 67 4.6 -9 673.00 -58.7 -54.4 -57.4 68 -99 SPO 1997 10 18 00 35 67 4.8 -9 673.00 -58.7 -54.4 -57.6 68 -99 SPO 1997 10 18 00 36 67 4.8 -9 673.00 -58.6 -54.4 -57.8 66 -99 SPO 1997 10 18 00 37 68 4.7 -9 673.00 -58.6 -54.3 -58.0 66 -99 SPO 1997 10 18 00 38 69 4.8 -9 673.00 -58.7 -54.3 -58.0 66 -99 SPO 1997 10 18 00 39 69 5.0 -9 673.00 -58.6 -54.3 -57.8 66 -99 SPO 1997 10 18 00 40 69 5.1 -9 673.00 -58.6 -54.4 -57.9 66 -99 SPO 1997 10 18 00 41 67 5.2 -9 673.00 -58.7 -54.4 -58.1 67 -99 SPO 1997 10 18 00 42 66 5.3 -9 673.00 -58.7 -54.4 -58.2 68 -99 SPO 1997 10 18 00 43 66 5.2 -9 673.00 -58.6 -54.2 -58.2 67 -99 SPO 1997 10 18 00 44 67 5.2 -9 673.00 -58.6 -54.2 -58.2 67 -99 SPO 1997 10 18 00 45 69 5.1 -9 673.00 -58.6 -54.1 -58.0 66 -99 SPO 1997 10 18 00 46 70 5.1 -9 672.90 -58.5 -54.2 -57.8 66 -99 SPO 1997 10 18 00 47 71 5.1 -9 673.00 -58.6 -54.3 -57.6 66 -99 SPO 1997 10 18 00 48 69 5.0 -9 673.00 -58.6 -54.4 -57.6 66 -99 SPO 1997 10 18 00 49 67 5.0 -9 673.00 -58.6 -54.4 -57.5 66 -99 SPO 1997 10 18 00 50 65 5.2 -9 673.00 -58.6 -54.4 -57.6 66 -99 SPO 1997 10 18 00 51 65 5.4 -9 672.90 -58.6 -54.2 -57.6 66 -99 SPO 1997 10 18 00 52 65 5.5 -9 672.90 -58.6 -54.2 -57.6 66 -99 SPO 1997 10 18 00 53 65 5.5 -9 672.90 -58.6 -54.2 -57.7 67 -99 SPO 1997 10 18 00 54 65 5.4 -9 673.00 -58.6 -54.1 -57.6 67 -99 SPO 1997 10 18 00 55 65 5.3 -9 673.00 -58.5 -54.1 -57.6 66 -99 SPO 1997 10 18 00 56 66 5.2 -9 673.00 -58.6 -54.2 -57.5 67 -99 SPO 1997 10 18 00 57 66 5.2 -9 673.00 -58.5 -54.1 -57.5 66 -99 SPO 1997 10 18 00 58 65 5.2 -9 673.00 -58.5 -54.1 -57.5 66 -99 SPO 1997 10 18 00 59 63 5.1 -9 672.90 -58.5 -54.1 -57.4 67 -99 SPO 1997 10 18 01 00 62 5.2 -9 672.90 -58.4 -54.2 -57.4 66 0 SPO 1997 10 18 01 01 62 5.3 -9 672.90 -58.4 -54.2 -57.4 66 -99 SPO 1997 10 18 01 02 62 5.4 -9 672.90 -58.4 -54.2 -57.4 65 -99 SPO 1997 10 18 01 03 62 5.3 -9 672.90 -58.4 -54.2 -57.4 65 -99 SPO 1997 10 18 01 04 61 5.2 -9 672.90 -58.4 -54.3 -57.4 66 -99 SPO 1997 10 18 01 05 62 5.1 -9 672.90 -58.5 -54.3 -57.4 66 -99 SPO 1997 10 18 01 06 62 5.1 -9 672.90 -58.5 -54.3 -57.4 67 -99 SPO 1997 10 18 01 07 62 5.3 -9 672.90 -58.5 -54.3 -57.4 67 -99 SPO 1997 10 18 01 08 61 5.4 -9 672.90 -58.5 -54.2 -57.5 67 -99 SPO 1997 10 18 01 09 59 5.4 -9 672.90 -58.5 -54.2 -57.5 66 -99 SPO 1997 10 18 01 10 59 5.5 -9 672.90 -58.5 -54.1 -57.5 66 -99 SPO 1997 10 18 01 11 58 5.7 -9 672.90 -58.5 -54.0 -57.5 67 -99 SPO 1997 10 18 01 12 57 5.8 -9 672.90 -58.5 -53.8 -57.6 66 -99 SPO 1997 10 18 01 13 56 5.8 -9 672.90 -58.5 -53.7 -57.6 66 -99 SPO 1997 10 18 01 14 56 5.8 -9 672.90 -58.5 -53.6 -57.6 66 -99 SPO 1997 10 18 01 15 55 6.0 -9 672.80 -58.5 -53.4 -57.6 66 -99 SPO 1997 10 18 01 16 55 6.2 -9 672.80 -58.4 -53.1 -57.5 65 -99 SPO 1997 10 18 01 17 54 6.0 -9 672.80 -58.4 -53.2 -57.5 66 -99 SPO 1997 10 18 01 18 54 5.8 -9 672.80 -58.5 -53.4 -57.6 66 -99 SPO 1997 10 18 01 19 53 5.8 -9 672.80 -58.5 -53.3 -57.5 67 -99 SPO 1997 10 18 01 20 53 5.7 -9 672.90 -58.5 -53.2 -57.6 67 -99 SPO 1997 10 18 01 21 54 5.7 -9 672.90 -58.5 -53.2 -57.6 67 -99 SPO 1997 10 18 01 22 54 5.5 -9 672.90 -58.5 -53.3 -57.6 67 -99 SPO 1997 10 18 01 23 54 5.3 -9 672.90 -58.5 -53.4 -57.5 67 -99 SPO 1997 10 18 01 24 56 5.3 -9 672.90 -58.5 -53.6 -57.5 67 -99 SPO 1997 10 18 01 25 57 5.2 -9 672.90 -58.5 -53.8 -57.6 66 -99 SPO 1997 10 18 01 26 57 5.2 -9 672.90 -58.6 -53.6 -57.5 67 -99 SPO 1997 10 18 01 27 57 5.1 -9 672.90 -58.6 -53.8 -57.6 66 -99 SPO 1997 10 18 01 28 56 5.1 -9 672.90 -58.6 -53.8 -57.6 66 -99 SPO 1997 10 18 01 29 56 5.3 -9 672.90 -58.7 -53.8 -57.6 67 -99 SPO 1997 10 18 01 30 56 5.5 -9 672.90 -58.7 -53.7 -57.7 66 -99 SPO 1997 10 18 01 31 56 5.3 -9 672.90 -58.7 -53.5 -57.7 66 -99 SPO 1997 10 18 01 32 55 5.5 -9 672.90 -58.7 -53.6 -57.7 66 -99 SPO 1997 10 18 01 33 56 5.6 -9 672.90 -58.8 -53.5 -57.7 67 -99 SPO 1997 10 18 01 34 55 5.9 -9 672.90 -58.8 -53.4 -57.8 68 -99 SPO 1997 10 18 01 35 53 5.8 -9 672.90 -58.7 -53.3 -57.8 67 -99 SPO 1997 10 18 01 36 52 5.8 -9 672.90 -58.8 -53.6 -57.8 68 -99 SPO 1997 10 18 01 37 52 5.9 -9 672.90 -58.8 -53.6 -57.8 67 -99 SPO 1997 10 18 01 38 53 5.8 -9 672.90 -58.7 -53.5 -57.8 66 -99 SPO 1997 10 18 01 39 51 5.8 -9 672.90 -58.7 -53.6 -57.8 65 -99 SPO 1997 10 18 01 40 52 5.8 -9 672.90 -58.7 -53.7 -57.8 65 -99 SPO 1997 10 18 01 41 53 5.6 -9 672.90 -58.7 -53.7 -57.8 65 -99 SPO 1997 10 18 01 42 53 5.5 -9 672.90 -58.8 -53.9 -57.8 66 -99 SPO 1997 10 18 01 43 52 5.3 -9 672.90 -58.7 -54.1 -57.8 65 -99 SPO 1997 10 18 01 44 51 5.2 -9 672.90 -58.7 -54.2 -57.7 66 -99 SPO 1997 10 18 01 45 52 5.3 -9 672.90 -58.7 -54.2 -57.7 66 -99 SPO 1997 10 18 01 46 51 5.2 -9 672.90 -58.6 -54.1 -57.7 66 -99 SPO 1997 10 18 01 47 50 5.3 -9 672.90 -58.6 -54.2 -57.7 66 -99 SPO 1997 10 18 01 48 50 5.5 -9 672.90 -58.6 -54.0 -57.6 66 -99 SPO 1997 10 18 01 49 51 5.5 -9 672.90 -58.6 -53.8 -57.6 66 -99 SPO 1997 10 18 01 50 50 5.5 -9 672.90 -58.6 -53.7 -57.7 66 -99 SPO 1997 10 18 01 51 49 5.5 -9 672.90 -58.6 -53.6 -57.7 66 -99 SPO 1997 10 18 01 52 49 5.6 -9 672.90 -58.6 -53.5 -57.7 66 -99 SPO 1997 10 18 01 53 50 5.6 -9 672.90 -58.5 -53.4 -57.7 66 -99 SPO 1997 10 18 01 54 52 5.4 -9 672.90 -58.5 -53.4 -57.7 66 -99 SPO 1997 10 18 01 55 52 5.2 -9 672.90 -58.6 -53.6 -57.6 67 -99 SPO 1997 10 18 01 56 52 4.8 -9 673.00 -58.6 -53.9 -57.6 67 -99 SPO 1997 10 18 01 57 55 4.7 -9 673.00 -58.6 -54.2 -57.6 67 -99 SPO 1997 10 18 01 58 55 4.7 -9 673.00 -58.6 -54.4 -57.6 67 -99 SPO 1997 10 18 01 59 55 4.5 -9 673.00 -58.7 -54.6 -57.5 69 -99 SPO 1997 10 18 02 00 56 4.5 -9 673.00 -58.7 -54.7 -57.5 68 0 SPO 1997 10 18 02 01 55 4.5 -9 673.00 -58.6 -54.6 -57.5 66 -99 SPO 1997 10 18 02 02 54 4.5 -9 673.00 -58.7 -54.6 -57.5 67 -99 SPO 1997 10 18 02 03 54 4.7 -9 673.00 -58.7 -54.6 -57.5 67 -99 SPO 1997 10 18 02 04 54 4.8 -9 672.90 -58.7 -54.5 -57.6 66 -99 SPO 1997 10 18 02 05 54 4.7 -9 673.00 -58.8 -54.6 -57.6 68 -99 SPO 1997 10 18 02 06 54 4.5 -9 673.00 -58.8 -54.8 -57.6 68 -99 SPO 1997 10 18 02 07 55 4.5 -9 673.00 -58.8 -55.0 -57.6 68 -99 SPO 1997 10 18 02 08 56 4.7 -9 672.90 -58.8 -54.9 -57.7 68 -99 SPO 1997 10 18 02 09 54 4.7 -9 673.00 -58.9 -54.9 -57.7 69 -99 SPO 1997 10 18 02 10 53 4.7 -9 673.00 -59.0 -54.8 -57.7 69 -99 SPO 1997 10 18 02 11 53 4.7 -9 672.90 -59.0 -54.6 -57.7 69 -99 SPO 1997 10 18 02 12 54 5.0 -9 672.90 -58.9 -54.6 -57.7 67 -99 SPO 1997 10 18 02 13 57 4.8 -9 672.90 -59.0 -54.4 -57.8 68 -99 SPO 1997 10 18 02 14 58 4.5 -9 673.00 -59.0 -54.6 -57.8 68 -99 SPO 1997 10 18 02 15 62 4.1 -9 673.00 -59.1 -54.8 -57.6 68 -99 SPO 1997 10 18 02 16 64 4.0 -9 673.00 -59.2 -55.1 -57.4 69 -99 SPO 1997 10 18 02 17 64 4.1 -9 673.00 -59.2 -55.1 -57.3 69 -99 SPO 1997 10 18 02 18 62 4.4 -9 673.00 -59.2 -55.0 -57.3 68 -99 SPO 1997 10 18 02 19 61 4.7 -9 673.00 -59.2 -54.8 -57.5 68 -99 SPO 1997 10 18 02 20 59 5.0 -9 673.00 -59.2 -54.6 -57.7 67 -99 SPO 1997 10 18 02 21 57 5.1 -9 672.90 -59.2 -54.5 -57.9 68 -99 SPO 1997 10 18 02 22 57 5.1 -9 672.90 -59.2 -54.4 -58.0 68 -99 SPO 1997 10 18 02 23 56 5.1 -9 672.90 -59.3 -54.4 -58.0 69 -99 SPO 1997 10 18 02 24 56 5.1 -9 672.90 -59.3 -54.6 -58.0 68 -99 SPO 1997 10 18 02 25 56 5.2 -9 672.90 -59.3 -54.4 -58.0 68 -99 SPO 1997 10 18 02 26 56 5.3 -9 672.90 -59.2 -54.3 -58.0 67 -99 SPO 1997 10 18 02 27 56 5.5 -9 672.90 -59.2 -54.2 -58.0 67 -99 SPO 1997 10 18 02 28 55 5.5 -9 672.90 -59.2 -54.0 -58.0 67 -99 SPO 1997 10 18 02 29 55 5.4 -9 672.90 -59.2 -54.0 -58.0 68 -99 SPO 1997 10 18 02 30 57 5.2 -9 672.90 -59.2 -54.1 -58.0 68 -99 SPO 1997 10 18 02 31 58 5.0 -9 672.90 -59.2 -54.2 -58.0 68 -99 SPO 1997 10 18 02 32 59 4.8 -9 672.90 -59.2 -54.4 -58.0 68 -99 SPO 1997 10 18 02 33 59 4.9 -9 672.90 -59.2 -54.4 -58.0 68 -99 SPO 1997 10 18 02 34 57 5.0 -9 672.90 -59.2 -54.3 -58.0 67 -99 SPO 1997 10 18 02 35 55 5.0 -9 672.90 -59.2 -54.3 -58.0 67 -99 SPO 1997 10 18 02 36 54 4.8 -9 672.90 -59.2 -54.3 -58.0 67 -99 SPO 1997 10 18 02 37 53 4.8 -9 672.90 -59.3 -54.2 -58.0 68 -99 SPO 1997 10 18 02 38 54 4.9 -9 672.90 -59.2 -54.1 -58.0 67 -99 SPO 1997 10 18 02 39 53 4.8 -9 672.90 -59.3 -54.0 -58.1 68 -99 SPO 1997 10 18 02 40 53 4.5 -9 672.90 -59.3 -54.2 -58.1 68 -99 SPO 1997 10 18 02 41 53 4.2 -9 672.90 -59.4 -54.4 -58.1 69 -99 SPO 1997 10 18 02 42 53 3.7 -9 673.00 -59.4 -54.8 -58.0 69 -99 SPO 1997 10 18 02 43 52 3.3 -9 673.00 -59.4 -55.2 -57.8 69 -99 SPO 1997 10 18 02 44 52 3.2 -9 673.00 -59.5 -55.4 -57.7 70 -99 SPO 1997 10 18 02 45 53 3.5 -9 673.00 -59.4 -55.4 -57.7 69 -99 SPO 1997 10 18 02 46 51 3.5 -9 673.00 -59.4 -55.2 -57.8 69 -99 SPO 1997 10 18 02 47 49 3.5 -9 673.00 -59.4 -55.2 -57.7 69 -99 SPO 1997 10 18 02 48 49 3.5 -9 673.00 -59.5 -55.4 -57.6 69 -99 SPO 1997 10 18 02 49 50 3.5 -9 673.00 -59.5 -55.5 -57.6 68 -99 SPO 1997 10 18 02 50 50 3.2 -9 672.90 -59.5 -55.7 -57.6 67 -99 SPO 1997 10 18 02 51 52 3.4 -9 672.90 -59.6 -55.9 -57.6 68 -99 SPO 1997 10 18 02 52 48 3.0 -9 673.00 -59.6 -56.0 -57.5 69 -99 SPO 1997 10 18 02 53 45 3.0 -9 673.00 -59.6 -56.1 -57.4 69 -99 SPO 1997 10 18 02 54 49 3.5 -9 673.00 -59.5 -56.0 -57.4 68 -99 SPO 1997 10 18 02 55 49 3.8 -9 673.00 -59.4 -55.6 -57.6 68 -99 SPO 1997 10 18 02 56 48 3.7 -9 673.00 -59.4 -55.4 -57.6 69 -99 SPO 1997 10 18 02 57 49 3.7 -9 673.00 -59.4 -55.3 -57.6 70 -99 SPO 1997 10 18 02 58 52 4.0 -9 673.00 -59.5 -55.3 -57.7 70 -99 SPO 1997 10 18 02 59 52 4.2 -9 673.00 -59.5 -55.1 -57.8 70 -99 SPO 1997 10 18 03 00 52 4.1 -9 673.00 -59.6 -54.9 -57.8 70 0 SPO 1997 10 18 03 01 51 4.0 -9 673.00 -59.6 -54.9 -57.7 69 -99 SPO 1997 10 18 03 02 51 4.2 -9 673.00 -59.6 -55.0 -57.7 69 -99 SPO 1997 10 18 03 03 52 4.1 -9 672.90 -59.6 -54.9 -57.8 68 -99 SPO 1997 10 18 03 04 54 4.0 -9 672.90 -59.6 -54.9 -57.8 67 -99 SPO 1997 10 18 03 05 58 3.7 -9 673.00 -59.6 -54.9 -57.7 67 -99 SPO 1997 10 18 03 06 59 3.6 -9 673.00 -59.6 -55.1 -57.5 67 -99 SPO 1997 10 18 03 07 58 3.6 -9 673.00 -59.6 -55.2 -57.4 67 -99 SPO 1997 10 18 03 08 55 3.6 -9 673.00 -59.6 -55.2 -57.4 68 -99 SPO 1997 10 18 03 09 54 3.7 -9 673.00 -59.5 -55.2 -57.5 67 -99 SPO 1997 10 18 03 10 52 4.0 -9 673.00 -59.6 -55.0 -57.6 69 -99 SPO 1997 10 18 03 11 53 4.0 -9 673.00 -59.6 -55.0 -57.7 69 -99 SPO 1997 10 18 03 12 52 4.0 -9 672.90 -59.6 -55.0 -57.8 69 -99 SPO 1997 10 18 03 13 50 3.9 -9 673.00 -59.7 -55.0 -57.8 68 -99 SPO 1997 10 18 03 14 51 3.8 -9 673.00 -59.7 -55.0 -57.8 68 -99 SPO 1997 10 18 03 15 54 3.6 -9 673.00 -59.7 -55.2 -57.7 67 -99 SPO 1997 10 18 03 16 58 3.4 -9 673.00 -59.6 -55.3 -57.6 66 -99 SPO 1997 10 18 03 17 58 3.1 -9 673.10 -59.6 -55.5 -57.4 66 -99 SPO 1997 10 18 03 18 57 3.1 -9 673.10 -59.6 -55.8 -57.1 67 -99 SPO 1997 10 18 03 19 57 3.2 -9 673.10 -59.6 -55.8 -57.0 68 -99 SPO 1997 10 18 03 20 58 3.4 -9 673.10 -59.6 -55.8 -57.0 68 -99 SPO 1997 10 18 03 21 58 3.3 -9 673.10 -59.6 -55.9 -57.0 69 -99 SPO 1997 10 18 03 22 61 3.2 -9 673.20 -59.6 -56.0 -57.0 69 -99 SPO 1997 10 18 03 23 65 3.0 -9 673.20 -59.6 -56.2 -57.0 69 -99 SPO 1997 10 18 03 24 69 2.9 -9 673.20 -59.6 -56.2 -56.9 69 -99 SPO 1997 10 18 03 25 72 2.8 -9 673.20 -59.7 -56.2 -57.0 69 -99 SPO 1997 10 18 03 26 70 3.2 -9 673.20 -59.7 -56.2 -57.1 68 -99 SPO 1997 10 18 03 27 70 3.4 -9 673.20 -59.8 -56.1 -57.1 68 -99 SPO 1997 10 18 03 28 72 3.1 -9 673.20 -59.8 -56.3 -57.1 67 -99 SPO 1997 10 18 03 29 72 3.0 -9 673.30 -59.8 -56.2 -57.3 67 -99 SPO 1997 10 18 03 30 74 3.0 -9 673.30 -59.8 -56.2 -57.3 68 -99 SPO 1997 10 18 03 31 74 3.3 -9 673.30 -59.7 -56.3 -57.3 67 -99 SPO 1997 10 18 03 32 74 3.2 -9 673.30 -59.8 -56.2 -57.4 69 -99 SPO 1997 10 18 03 33 74 3.4 -9 673.30 -59.8 -56.3 -57.3 69 -99 SPO 1997 10 18 03 34 73 3.5 -9 673.30 -59.7 -56.2 -57.2 68 -99 SPO 1997 10 18 03 35 69 3.3 -9 673.30 -59.8 -56.2 -57.2 69 -99 SPO 1997 10 18 03 36 71 3.2 -9 673.30 -59.7 -56.2 -57.1 67 -99 SPO 1997 10 18 03 37 73 3.4 -9 673.30 -59.7 -56.4 -57.2 68 -99 SPO 1997 10 18 03 38 75 3.6 -9 673.30 -59.8 -56.5 -57.2 69 -99 SPO 1997 10 18 03 39 74 3.7 -9 673.30 -59.8 -56.4 -57.4 68 -99 SPO 1997 10 18 03 40 74 3.6 -9 673.30 -59.8 -56.4 -57.4 68 -99 SPO 1997 10 18 03 41 73 3.7 -9 673.30 -59.8 -56.5 -57.4 68 -99 SPO 1997 10 18 03 42 70 3.7 -9 673.30 -59.8 -56.4 -57.3 68 -99 SPO 1997 10 18 03 43 68 3.5 -9 673.30 -59.8 -56.3 -57.3 68 -99 SPO 1997 10 18 03 44 74 3.5 -9 673.30 -59.8 -56.4 -57.3 69 -99 SPO 1997 10 18 03 45 76 3.4 -9 673.30 -59.8 -56.6 -57.3 69 -99 SPO 1997 10 18 03 46 79 3.5 -9 673.30 -59.9 -56.6 -57.3 69 -99 SPO 1997 10 18 03 47 79 3.2 -9 673.30 -60.0 -56.7 -57.4 69 -99 SPO 1997 10 18 03 48 78 3.4 -9 673.30 -60.2 -56.6 -57.5 70 -99 SPO 1997 10 18 03 49 75 3.5 -9 673.30 -60.2 -56.5 -57.5 70 -99 SPO 1997 10 18 03 50 73 3.5 -9 673.30 -60.2 -56.5 -57.5 69 -99 SPO 1997 10 18 03 51 71 3.6 -9 673.30 -60.1 -56.5 -57.6 68 -99 SPO 1997 10 18 03 52 74 3.5 -9 673.30 -60.0 -56.5 -57.6 66 -99 SPO 1997 10 18 03 53 75 3.4 -9 673.30 -60.0 -56.5 -57.6 66 -99 SPO 1997 10 18 03 54 76 3.4 -9 673.30 -60.0 -56.7 -57.5 66 -99 SPO 1997 10 18 03 55 74 3.6 -9 673.30 -59.8 -56.6 -57.5 64 -99 SPO 1997 10 18 03 56 72 3.7 -9 673.30 -59.8 -56.4 -57.5 65 -99 SPO 1997 10 18 03 57 71 3.8 -9 673.30 -59.7 -56.3 -57.4 66 -99 SPO 1997 10 18 03 58 70 3.6 -9 673.30 -59.7 -56.2 -57.5 66 -99 SPO 1997 10 18 03 59 71 3.7 -9 673.30 -59.7 -56.4 -57.5 67 -99 SPO 1997 10 18 04 00 73 3.9 -9 673.30 -59.6 -56.2 -57.5 67 0 SPO 1997 10 18 04 01 74 3.6 -9 673.40 -59.6 -56.1 -57.4 68 -99 SPO 1997 10 18 04 02 70 3.5 -9 673.40 -59.6 -56.2 -57.2 68 -99 SPO 1997 10 18 04 03 70 3.6 -9 673.40 -59.4 -56.0 -57.2 67 -99 SPO 1997 10 18 04 04 73 3.5 -9 673.40 -59.3 -56.0 -57.1 65 -99 SPO 1997 10 18 04 05 74 3.1 -9 673.40 -59.2 -56.1 -57.0 65 -99 SPO 1997 10 18 04 06 74 3.4 -9 673.40 -59.1 -56.3 -56.9 65 -99 SPO 1997 10 18 04 07 75 3.6 -9 673.40 -59.0 -56.4 -56.9 64 -99 SPO 1997 10 18 04 08 73 3.5 -9 673.40 -59.1 -56.3 -57.0 65 -99 SPO 1997 10 18 04 09 71 3.3 -9 673.40 -59.1 -56.4 -56.9 66 -99 SPO 1997 10 18 04 10 68 3.3 -9 673.40 -59.1 -56.4 -57.0 68 -99 SPO 1997 10 18 04 11 70 3.4 -9 673.40 -59.1 -56.4 -57.0 68 -99 SPO 1997 10 18 04 12 70 3.8 -9 673.30 -59.1 -56.4 -57.0 69 -99 SPO 1997 10 18 04 13 69 4.0 -9 673.30 -59.2 -56.2 -57.2 71 -99 SPO 1997 10 18 04 14 67 4.0 -9 673.30 -59.2 -56.0 -57.4 71 -99 SPO 1997 10 18 04 15 67 3.9 -9 673.30 -59.2 -56.0 -57.5 70 -99 SPO 1997 10 18 04 16 66 4.0 -9 673.30 -59.2 -56.1 -57.6 70 -99 SPO 1997 10 18 04 17 65 4.1 -9 673.30 -59.2 -56.0 -57.6 70 -99 SPO 1997 10 18 04 18 64 4.2 -9 673.30 -59.2 -55.9 -57.7 70 -99 SPO 1997 10 18 04 19 60 4.3 -9 673.30 -59.2 -55.9 -57.7 69 -99 SPO 1997 10 18 04 20 60 4.3 -9 673.30 -59.3 -55.9 -57.8 69 -99 SPO 1997 10 18 04 21 60 3.9 -9 673.30 -59.3 -55.9 -57.8 69 -99 SPO 1997 10 18 04 22 59 3.6 -9 673.30 -59.4 -56.0 -57.7 69 -99 SPO 1997 10 18 04 23 57 3.7 -9 673.40 -59.4 -56.0 -57.6 69 -99 SPO 1997 10 18 04 24 58 3.9 -9 673.30 -59.4 -56.1 -57.6 69 -99 SPO 1997 10 18 04 25 58 4.0 -9 673.30 -59.4 -56.1 -57.8 69 -99 SPO 1997 10 18 04 26 57 4.0 -9 673.30 -59.5 -56.1 -57.8 70 -99 SPO 1997 10 18 04 27 57 4.3 -9 673.30 -59.4 -55.8 -57.9 69 -99 SPO 1997 10 18 04 28 57 4.5 -9 673.30 -59.4 -55.8 -58.0 69 -99 SPO 1997 10 18 04 29 55 4.4 -9 673.30 -59.4 -55.7 -58.0 69 -99 SPO 1997 10 18 04 30 57 4.5 -9 673.30 -59.3 -55.6 -58.0 68 -99 SPO 1997 10 18 04 31 57 4.3 -9 673.30 -59.3 -55.6 -58.1 68 -99 SPO 1997 10 18 04 32 56 4.0 -9 673.40 -59.3 -55.7 -58.0 67 -99 SPO 1997 10 18 04 33 60 4.1 -9 673.40 -59.3 -55.9 -58.0 68 -99 SPO 1997 10 18 04 34 59 3.6 -9 673.40 -59.3 -56.0 -58.0 68 -99 SPO 1997 10 18 04 35 59 3.7 -9 673.40 -59.3 -56.0 -57.9 68 -99 SPO 1997 10 18 04 36 60 3.7 -9 673.40 -59.3 -55.8 -57.9 68 -99 SPO 1997 10 18 04 37 60 3.6 -9 673.40 -59.4 -56.0 -57.9 70 -99 SPO 1997 10 18 04 38 62 3.9 -9 673.40 -59.3 -55.8 -57.9 68 -99 SPO 1997 10 18 04 39 63 3.8 -9 673.40 -59.3 -55.8 -57.9 68 -99 SPO 1997 10 18 04 40 60 3.6 -9 673.50 -59.4 -56.0 -57.9 70 -99 SPO 1997 10 18 04 41 60 3.3 -9 673.50 -59.4 -56.0 -57.9 70 -99 SPO 1997 10 18 04 42 61 3.6 -9 673.50 -59.4 -56.0 -57.9 69 -99 SPO 1997 10 18 04 43 61 3.7 -9 673.40 -59.3 -56.0 -58.0 68 -99 SPO 1997 10 18 04 44 59 3.6 -9 673.50 -59.4 -55.9 -58.0 69 -99 SPO 1997 10 18 04 45 59 3.6 -9 673.50 -59.4 -55.9 -58.0 68 -99 SPO 1997 10 18 04 46 61 3.9 -9 673.40 -59.3 -55.8 -58.0 67 -99 SPO 1997 10 18 04 47 61 4.1 -9 673.40 -59.3 -55.6 -58.1 68 -99 SPO 1997 10 18 04 48 57 3.9 -9 673.40 -59.4 -55.6 -58.2 69 -99 SPO 1997 10 18 04 49 55 3.8 -9 673.50 -59.4 -55.5 -58.2 69 -99 SPO 1997 10 18 04 50 56 4.1 -9 673.40 -59.4 -55.5 -58.2 70 -99 SPO 1997 10 18 04 51 57 4.2 -9 673.40 -59.3 -55.3 -58.3 69 -99 SPO 1997 10 18 04 52 54 3.8 -9 673.50 -59.3 -55.4 -58.2 70 -99 SPO 1997 10 18 04 53 56 4.0 -9 673.40 -59.3 -55.6 -58.2 70 -99 SPO 1997 10 18 04 54 55 3.8 -9 673.40 -59.3 -55.5 -58.3 69 -99 SPO 1997 10 18 04 55 56 4.0 -9 673.40 -59.4 -55.6 -58.3 69 -99 SPO 1997 10 18 04 56 58 4.2 -9 673.40 -59.3 -55.5 -58.3 68 -99 SPO 1997 10 18 04 57 58 4.2 -9 673.40 -59.4 -55.4 -58.4 69 -99 SPO 1997 10 18 04 58 59 4.3 -9 673.40 -59.4 -55.4 -58.4 68 -99 SPO 1997 10 18 04 59 60 4.3 -9 673.40 -59.4 -55.3 -58.4 68 -99 SPO 1997 10 18 05 00 59 4.2 -9 673.40 -59.4 -55.4 -58.4 69 0 SPO 1997 10 18 05 01 60 4.0 -9 673.40 -59.4 -55.5 -58.4 69 -99 SPO 1997 10 18 05 02 61 4.1 -9 673.40 -59.4 -55.5 -58.4 69 -99 SPO 1997 10 18 05 03 61 4.0 -9 673.40 -59.4 -55.5 -58.4 69 -99 SPO 1997 10 18 05 04 61 4.0 -9 673.30 -59.4 -55.5 -58.4 69 -99 SPO 1997 10 18 05 05 59 3.5 -9 673.40 -59.4 -55.6 -58.4 69 -99 SPO 1997 10 18 05 06 62 3.7 -9 673.40 -59.4 -55.6 -58.4 68 -99 SPO 1997 10 18 05 07 61 3.6 -9 673.40 -59.4 -55.6 -58.4 68 -99 SPO 1997 10 18 05 08 59 3.4 -9 673.40 -59.4 -55.7 -58.3 67 -99 SPO 1997 10 18 05 09 63 3.5 -9 673.40 -59.4 -55.9 -58.3 66 -99 SPO 1997 10 18 05 10 64 3.6 -9 673.40 -59.4 -55.8 -58.3 65 -99 SPO 1997 10 18 05 11 67 3.7 -9 673.40 -59.4 -55.7 -58.2 65 -99 SPO 1997 10 18 05 12 68 3.2 -9 673.40 -59.4 -55.8 -58.1 67 -99 SPO 1997 10 18 05 13 72 2.9 -9 673.50 -59.4 -56.2 -57.8 67 -99 SPO 1997 10 18 05 14 78 3.0 -9 673.50 -59.5 -56.2 -57.8 68 -99 SPO 1997 10 18 05 15 76 2.8 -9 673.50 -59.5 -56.4 -57.8 68 -99 SPO 1997 10 18 05 16 73 2.7 -9 673.50 -59.6 -56.6 -57.7 69 -99 SPO 1997 10 18 05 17 70 3.0 -9 673.50 -59.7 -56.6 -57.6 70 -99 SPO 1997 10 18 05 18 69 3.0 -9 673.40 -59.7 -56.5 -57.8 70 -99 SPO 1997 10 18 05 19 67 3.0 -9 673.50 -59.7 -56.4 -57.9 70 -99 SPO 1997 10 18 05 20 68 3.1 -9 673.50 -59.7 -56.4 -58.0 69 -99 SPO 1997 10 18 05 21 66 3.0 -9 673.40 -59.8 -56.4 -58.2 70 -99 SPO 1997 10 18 05 22 61 2.8 -9 673.50 -59.8 -56.5 -58.2 69 -99 SPO 1997 10 18 05 23 62 3.2 -9 673.40 -59.9 -56.3 -58.3 69 -99 SPO 1997 10 18 05 24 58 3.2 -9 673.40 -59.9 -56.1 -58.4 69 -99 SPO 1997 10 18 05 25 56 3.3 -9 673.40 -59.8 -56.1 -58.4 68 -99 SPO 1997 10 18 05 26 55 3.3 -9 673.40 -59.8 -56.0 -58.4 68 -99 SPO 1997 10 18 05 27 54 3.2 -9 673.50 -59.8 -55.8 -58.3 69 -99 SPO 1997 10 18 05 28 55 3.5 -9 673.50 -59.8 -55.9 -58.3 70 -99 SPO 1997 10 18 05 29 54 3.7 -9 673.50 -59.8 -55.8 -58.4 70 -99 SPO 1997 10 18 05 30 55 4.1 -9 673.50 -59.7 -55.6 -58.4 70 -99 SPO 1997 10 18 05 31 55 4.2 -9 673.50 -59.7 -55.4 -58.4 70 -99 SPO 1997 10 18 05 32 56 4.3 -9 673.40 -59.7 -55.3 -58.4 70 -99 SPO 1997 10 18 05 33 54 4.2 -9 673.50 -59.7 -55.2 -58.4 70 -99 SPO 1997 10 18 05 34 54 3.8 -9 673.60 -59.6 -55.3 -58.4 69 -99 SPO 1997 10 18 05 35 56 3.6 -9 673.60 -59.6 -55.6 -58.3 69 -99 SPO 1997 10 18 05 36 55 3.3 -9 673.60 -59.6 -55.7 -58.2 69 -99 SPO 1997 10 18 05 37 53 3.0 -9 673.60 -59.6 -55.8 -58.2 69 -99 SPO 1997 10 18 05 38 51 2.8 -9 673.60 -59.6 -56.1 -58.0 69 -99 SPO 1997 10 18 05 39 47 2.9 -9 673.70 -59.6 -56.3 -58.0 69 -99 SPO 1997 10 18 05 40 47 3.2 -9 673.70 -59.6 -56.3 -58.0 69 -99 SPO 1997 10 18 05 41 47 3.1 -9 673.70 -59.5 -56.3 -58.0 69 -99 SPO 1997 10 18 05 42 47 3.1 -9 673.70 -59.4 -56.3 -58.0 69 -99 SPO 1997 10 18 05 43 44 2.9 -9 673.70 -59.4 -56.4 -57.9 69 -99 SPO 1997 10 18 05 44 42 3.0 -9 673.70 -59.4 -56.8 -58.0 70 -99 SPO 1997 10 18 05 45 42 3.1 -9 673.70 -59.4 -56.8 -58.0 70 -99 SPO 1997 10 18 05 46 45 3.4 -9 673.70 -59.3 -56.7 -57.9 70 -99 SPO 1997 10 18 05 47 45 3.1 -9 673.70 -59.3 -56.8 -57.9 70 -99 SPO 1997 10 18 05 48 45 2.8 -9 673.70 -59.3 -56.9 -57.8 70 -99 SPO 1997 10 18 05 49 47 2.9 -9 673.70 -59.4 -56.8 -57.7 71 -99 SPO 1997 10 18 05 50 45 2.7 -9 673.70 -59.3 -56.8 -57.7 70 -99 SPO 1997 10 18 05 51 47 3.2 -9 673.80 -59.3 -56.7 -57.7 70 -99 SPO 1997 10 18 05 52 47 3.0 -9 673.80 -59.2 -56.2 -57.8 69 -99 SPO 1997 10 18 05 53 47 2.9 -9 673.80 -59.3 -56.4 -57.7 70 -99 SPO 1997 10 18 05 54 50 3.2 -9 673.70 -59.2 -56.4 -57.7 69 -99 SPO 1997 10 18 05 55 49 3.0 -9 673.80 -59.2 -56.4 -57.6 69 -99 SPO 1997 10 18 05 56 51 2.9 -9 673.70 -59.2 -56.4 -57.6 70 -99 SPO 1997 10 18 05 57 51 3.3 -9 673.70 -59.2 -56.4 -57.6 70 -99 SPO 1997 10 18 05 58 49 3.4 -9 673.70 -59.2 -56.3 -57.6 71 -99 SPO 1997 10 18 05 59 49 3.5 -9 673.70 -59.2 -56.2 -57.7 70 -99 SPO 1997 10 18 06 00 46 3.3 -9 673.70 -59.2 -56.2 -57.7 69 0 SPO 1997 10 18 06 01 44 3.2 -9 673.80 -59.2 -56.3 -57.6 70 -99 SPO 1997 10 18 06 02 47 3.5 -9 673.70 -59.3 -56.4 -57.7 71 -99 SPO 1997 10 18 06 03 48 3.4 -9 673.80 -59.2 -56.3 -57.7 69 -99 SPO 1997 10 18 06 04 45 3.2 -9 673.80 -59.3 -56.3 -57.7 69 -99 SPO 1997 10 18 06 05 45 3.4 -9 673.80 -59.4 -56.3 -57.7 69 -99 SPO 1997 10 18 06 06 41 3.4 -9 673.80 -59.3 -56.2 -57.7 68 -99 SPO 1997 10 18 06 07 41 3.2 -9 673.80 -59.3 -56.4 -57.6 68 -99 SPO 1997 10 18 06 08 43 3.3 -9 673.80 -59.2 -56.4 -57.6 68 -99 SPO 1997 10 18 06 09 43 3.4 -9 673.80 -59.2 -56.4 -57.6 68 -99 SPO 1997 10 18 06 10 42 3.4 -9 673.80 -59.2 -56.4 -57.6 69 -99 SPO 1997 10 18 06 11 44 3.6 -9 673.80 -59.2 -56.4 -57.6 69 -99 SPO 1997 10 18 06 12 47 3.9 -9 673.70 -59.2 -56.1 -57.7 70 -99 SPO 1997 10 18 06 13 44 4.0 -9 673.70 -59.2 -56.0 -57.8 70 -99 SPO 1997 10 18 06 14 41 3.9 -9 673.80 -59.2 -56.1 -57.8 70 -99 SPO 1997 10 18 06 15 43 4.0 -9 673.70 -59.2 -56.0 -57.7 70 -99 SPO 1997 10 18 06 16 42 3.9 -9 673.80 -59.1 -56.0 -57.7 68 -99 SPO 1997 10 18 06 17 43 3.8 -9 673.80 -59.1 -56.1 -57.6 67 -99 SPO 1997 10 18 06 18 47 3.9 -9 673.80 -59.0 -56.1 -57.6 66 -99 SPO 1997 10 18 06 19 46 3.9 -9 673.70 -58.9 -56.2 -57.6 66 -99 SPO 1997 10 18 06 20 44 3.9 -9 673.80 -59.0 -56.2 -57.7 67 -99 SPO 1997 10 18 06 21 45 4.0 -9 673.80 -59.1 -56.2 -57.7 68 -99 SPO 1997 10 18 06 22 46 3.9 -9 673.70 -59.2 -56.2 -57.7 70 -99 SPO 1997 10 18 06 23 44 3.6 -9 673.80 -59.2 -56.2 -57.7 70 -99 SPO 1997 10 18 06 24 44 3.5 -9 673.80 -59.2 -56.3 -57.6 70 -99 SPO 1997 10 18 06 25 44 3.9 -9 673.80 -59.2 -56.3 -57.6 69 -99 SPO 1997 10 18 06 26 45 3.8 -9 673.80 -59.0 -56.2 -57.6 67 -99 SPO 1997 10 18 06 27 43 3.8 -9 673.80 -59.0 -56.1 -57.7 67 -99 SPO 1997 10 18 06 28 43 4.0 -9 673.80 -59.1 -56.1 -57.6 68 -99 SPO 1997 10 18 06 29 43 4.0 -9 673.70 -59.0 -56.1 -57.6 67 -99 SPO 1997 10 18 06 30 42 4.1 -9 673.70 -58.9 -56.1 -57.6 66 -99 SPO 1997 10 18 06 31 42 4.1 -9 673.70 -58.8 -56.0 -57.5 65 -99 SPO 1997 10 18 06 32 42 4.2 -9 673.70 -58.8 -56.0 -57.5 66 -99 SPO 1997 10 18 06 33 44 4.0 -9 673.80 -58.8 -55.9 -57.5 67 -99 SPO 1997 10 18 06 34 41 3.8 -9 673.80 -58.8 -56.0 -57.5 67 -99 SPO 1997 10 18 06 35 42 3.8 -9 673.80 -58.7 -56.2 -57.4 66 -99 SPO 1997 10 18 06 36 44 4.0 -9 673.80 -58.6 -56.1 -57.4 67 -99 SPO 1997 10 18 06 37 41 4.1 -9 673.80 -58.7 -56.0 -57.4 68 -99 SPO 1997 10 18 06 38 41 3.9 -9 673.80 -58.7 -55.9 -57.4 68 -99 SPO 1997 10 18 06 39 43 4.2 -9 673.80 -58.7 -55.9 -57.4 69 -99 SPO 1997 10 18 06 40 43 4.2 -9 673.80 -58.7 -55.8 -57.4 69 -99 SPO 1997 10 18 06 41 42 4.2 -9 673.80 -58.7 -55.8 -57.4 69 -99 SPO 1997 10 18 06 42 44 4.3 -9 673.80 -58.7 -56.0 -57.4 68 -99 SPO 1997 10 18 06 43 44 4.2 -9 673.80 -58.6 -55.9 -57.4 67 -99 SPO 1997 10 18 06 44 40 4.1 -9 673.80 -58.6 -55.9 -57.4 67 -99 SPO 1997 10 18 06 45 43 4.4 -9 673.80 -58.6 -55.8 -57.4 67 -99 SPO 1997 10 18 06 46 44 4.2 -9 673.80 -58.6 -55.8 -57.4 67 -99 SPO 1997 10 18 06 47 46 3.9 -9 673.80 -58.6 -55.9 -57.3 67 -99 SPO 1997 10 18 06 48 45 3.7 -9 673.90 -58.7 -56.0 -57.3 68 -99 SPO 1997 10 18 06 49 47 3.6 -9 673.90 -58.7 -56.1 -57.3 68 -99 SPO 1997 10 18 06 50 47 3.4 -9 673.90 -58.7 -56.2 -57.2 67 -99 SPO 1997 10 18 06 51 47 3.4 -9 673.90 -58.7 -56.3 -57.2 67 -99 SPO 1997 10 18 06 52 48 3.4 -9 673.90 -58.8 -56.3 -57.2 68 -99 SPO 1997 10 18 06 53 48 3.1 -9 673.90 -58.9 -56.5 -57.2 69 -99 SPO 1997 10 18 06 54 48 3.1 -9 673.90 -59.0 -56.6 -57.1 69 -99 SPO 1997 10 18 06 55 49 3.3 -9 673.90 -59.0 -56.6 -57.2 69 -99 SPO 1997 10 18 06 56 47 3.3 -9 673.90 -59.1 -56.6 -57.3 69 -99 SPO 1997 10 18 06 57 45 3.3 -9 673.90 -59.2 -56.6 -57.3 70 -99 SPO 1997 10 18 06 58 46 3.2 -9 673.90 -59.3 -56.6 -57.3 70 -99 SPO 1997 10 18 06 59 48 3.3 -9 673.90 -59.3 -56.6 -57.3 70 -99 SPO 1997 10 18 07 00 47 3.3 -9 673.90 -59.3 -56.5 -57.4 70 0 SPO 1997 10 18 07 01 46 3.3 -9 673.90 -59.4 -56.6 -57.4 70 -99 SPO 1997 10 18 07 02 47 3.4 -9 673.90 -59.4 -56.6 -57.4 70 -99 SPO 1997 10 18 07 03 45 3.2 -9 673.90 -59.4 -56.6 -57.4 70 -99 SPO 1997 10 18 07 04 43 3.1 -9 673.90 -59.4 -56.6 -57.3 70 -99 SPO 1997 10 18 07 05 44 3.0 -9 673.90 -59.4 -56.7 -57.2 70 -99 SPO 1997 10 18 07 06 46 3.3 -9 673.90 -59.3 -56.7 -57.2 69 -99 SPO 1997 10 18 07 07 48 3.3 -9 673.90 -59.3 -56.7 -57.2 68 -99 SPO 1997 10 18 07 08 45 3.1 -9 673.90 -59.4 -56.7 -57.3 69 -99 SPO 1997 10 18 07 09 48 3.3 -9 673.90 -59.4 -56.7 -57.3 67 -99 SPO 1997 10 18 07 10 48 3.3 -9 673.90 -59.5 -56.8 -57.3 68 -99 SPO 1997 10 18 07 11 48 3.3 -9 673.90 -59.6 -56.8 -57.3 69 -99 SPO 1997 10 18 07 12 46 3.1 -9 673.90 -59.7 -57.0 -57.4 70 -99 SPO 1997 10 18 07 13 49 3.0 -9 673.90 -59.8 -57.0 -57.2 70 -99 SPO 1997 10 18 07 14 50 3.0 -9 673.90 -59.8 -57.1 -57.1 69 -99 SPO 1997 10 18 07 15 51 3.0 -9 673.90 -59.8 -57.0 -57.0 69 -99 SPO 1997 10 18 07 16 50 2.9 -9 673.90 -60.0 -57.0 -57.0 70 -99 SPO 1997 10 18 07 17 48 2.8 -9 674.00 -60.2 -57.1 -56.8 71 -99 SPO 1997 10 18 07 18 47 2.6 -9 674.00 -60.4 -57.2 -56.6 72 -99 SPO 1997 10 18 07 19 50 2.6 -9 673.90 -60.4 -57.2 -56.6 70 -99 SPO 1997 10 18 07 20 52 2.7 -9 673.90 -60.3 -57.2 -56.8 69 -99 SPO 1997 10 18 07 21 51 2.7 -9 674.00 -60.4 -57.2 -56.8 69 -99 SPO 1997 10 18 07 22 52 2.6 -9 674.00 -60.4 -57.3 -56.8 69 -99 SPO 1997 10 18 07 23 54 2.4 -9 674.00 -60.4 -57.3 -56.8 68 -99 SPO 1997 10 18 07 24 56 2.3 -9 674.00 -60.5 -57.2 -56.8 68 -99 SPO 1997 10 18 07 25 56 2.5 -9 674.00 -60.6 -57.2 -56.9 67 -99 SPO 1997 10 18 07 26 54 2.6 -9 674.00 -60.6 -57.3 -56.8 67 -99 SPO 1997 10 18 07 27 50 2.6 -9 674.00 -60.6 -57.3 -56.8 66 -99 SPO 1997 10 18 07 28 49 2.6 -9 674.00 -60.7 -57.4 -56.7 67 -99 SPO 1997 10 18 07 29 50 2.7 -9 674.00 -60.6 -57.4 -56.8 67 -99 SPO 1997 10 18 07 30 55 2.6 -9 674.00 -60.6 -57.3 -56.8 67 -99 SPO 1997 10 18 07 31 58 2.7 -9 674.00 -60.5 -57.3 -56.8 67 -99 SPO 1997 10 18 07 32 59 2.7 -9 674.00 -60.6 -57.3 -56.8 68 -99 SPO 1997 10 18 07 33 59 2.9 -9 674.00 -60.6 -57.2 -57.0 68 -99 SPO 1997 10 18 07 34 59 2.8 -9 674.00 -60.6 -57.2 -57.1 68 -99 SPO 1997 10 18 07 35 59 2.7 -9 674.00 -60.6 -57.2 -57.0 68 -99 SPO 1997 10 18 07 36 57 2.9 -9 674.00 -60.6 -57.2 -57.0 68 -99 SPO 1997 10 18 07 37 54 2.8 -9 674.00 -60.6 -57.3 -57.0 67 -99 SPO 1997 10 18 07 38 56 2.8 -9 674.00 -60.5 -57.2 -56.9 66 -99 SPO 1997 10 18 07 39 56 3.1 -9 674.00 -60.5 -57.2 -57.2 66 -99 SPO 1997 10 18 07 40 55 3.3 -9 674.00 -60.3 -57.1 -57.4 64 -99 SPO 1997 10 18 07 41 56 3.3 -9 674.00 -60.0 -57.1 -57.6 64 -99 SPO 1997 10 18 07 42 58 3.6 -9 674.00 -59.8 -57.0 -57.7 64 -99 SPO 1997 10 18 07 43 58 3.7 -9 674.00 -59.8 -56.8 -57.8 64 -99 SPO 1997 10 18 07 44 57 3.8 -9 674.00 -59.8 -56.6 -57.8 65 -99 SPO 1997 10 18 07 45 54 3.7 -9 674.00 -59.8 -56.5 -57.9 65 -99 SPO 1997 10 18 07 46 52 3.9 -9 674.00 -59.8 -56.6 -58.0 66 -99 SPO 1997 10 18 07 47 50 4.0 -9 674.00 -59.8 -56.6 -58.0 67 -99 SPO 1997 10 18 07 48 50 4.2 -9 674.00 -59.7 -56.6 -58.1 67 -99 SPO 1997 10 18 07 49 49 4.0 -9 674.00 -59.7 -56.6 -58.1 67 -99 SPO 1997 10 18 07 50 47 4.0 -9 674.00 -59.6 -56.5 -58.0 67 -99 SPO 1997 10 18 07 51 46 4.0 -9 674.10 -59.6 -56.5 -58.0 67 -99 SPO 1997 10 18 07 52 44 4.1 -9 674.00 -59.6 -56.6 -58.0 68 -99 SPO 1997 10 18 07 53 43 3.9 -9 674.00 -59.5 -56.6 -58.0 67 -99 SPO 1997 10 18 07 54 44 3.8 -9 674.10 -59.4 -56.5 -57.9 66 -99 SPO 1997 10 18 07 55 45 3.8 -9 674.10 -59.3 -56.5 -57.9 66 -99 SPO 1997 10 18 07 56 44 3.9 -9 674.10 -59.4 -56.5 -57.9 68 -99 SPO 1997 10 18 07 57 42 4.1 -9 674.10 -59.4 -56.5 -58.0 69 -99 SPO 1997 10 18 07 58 41 4.0 -9 674.10 -59.4 -56.6 -58.0 69 -99 SPO 1997 10 18 07 59 39 3.9 -9 674.10 -59.4 -56.5 -57.9 69 -99 SPO 1997 10 18 08 00 40 4.0 -9 674.10 -59.3 -56.6 -57.9 68 0 SPO 1997 10 18 08 01 38 3.8 -9 674.20 -59.3 -56.6 -57.9 68 -99 SPO 1997 10 18 08 02 37 3.7 -9 674.20 -59.3 -56.7 -57.9 68 -99 SPO 1997 10 18 08 03 37 3.6 -9 674.20 -59.2 -56.6 -57.8 67 -99 SPO 1997 10 18 08 04 38 3.6 -9 674.20 -59.2 -56.7 -57.7 67 -99 SPO 1997 10 18 08 05 40 3.4 -9 674.20 -59.2 -56.7 -57.7 68 -99 SPO 1997 10 18 08 06 43 3.3 -9 674.20 -59.2 -56.8 -57.7 68 -99 SPO 1997 10 18 08 07 46 3.4 -9 674.20 -59.2 -56.7 -57.7 68 -99 SPO 1997 10 18 08 08 46 3.2 -9 674.20 -59.2 -56.8 -57.7 68 -99 SPO 1997 10 18 08 09 42 3.2 -9 674.20 -59.4 -57.0 -57.6 70 -99 SPO 1997 10 18 08 10 45 3.4 -9 674.20 -59.3 -57.1 -57.7 70 -99 SPO 1997 10 18 08 11 45 3.5 -9 674.20 -59.3 -56.9 -57.8 70 -99 SPO 1997 10 18 08 12 44 3.7 -9 674.20 -59.4 -56.8 -57.8 70 -99 SPO 1997 10 18 08 13 44 3.8 -9 674.10 -59.4 -56.8 -57.9 70 -99 SPO 1997 10 18 08 14 43 3.9 -9 674.10 -59.4 -56.8 -58.0 70 -99 SPO 1997 10 18 08 15 41 4.0 -9 674.10 -59.4 -56.8 -58.0 70 -99 SPO 1997 10 18 08 16 42 4.2 -9 674.10 -59.4 -56.8 -58.0 70 -99 SPO 1997 10 18 08 17 42 4.4 -9 674.10 -59.4 -56.7 -58.1 69 -99 SPO 1997 10 18 08 18 42 4.4 -9 674.10 -59.4 -56.6 -58.1 68 -99 SPO 1997 10 18 08 19 42 4.4 -9 674.10 -59.4 -56.6 -58.1 67 -99 SPO 1997 10 18 08 20 43 4.3 -9 674.10 -59.4 -56.5 -58.1 67 -99 SPO 1997 10 18 08 21 43 4.2 -9 674.10 -59.4 -56.5 -58.0 67 -99 SPO 1997 10 18 08 22 41 4.0 -9 674.20 -59.4 -56.6 -58.0 67 -99 SPO 1997 10 18 08 23 40 4.0 -9 674.20 -59.3 -56.7 -57.9 66 -99 SPO 1997 10 18 08 24 39 3.9 -9 674.20 -59.3 -56.8 -57.9 67 -99 SPO 1997 10 18 08 25 39 3.9 -9 674.20 -59.3 -56.8 -57.9 67 -99 SPO 1997 10 18 08 26 40 3.9 -9 674.20 -59.3 -56.8 -57.9 67 -99 SPO 1997 10 18 08 27 41 3.7 -9 674.20 -59.3 -56.8 -57.8 68 -99 SPO 1997 10 18 08 28 43 3.7 -9 674.20 -59.3 -56.8 -57.8 68 -99 SPO 1997 10 18 08 29 45 3.8 -9 674.20 -59.3 -56.7 -57.8 68 -99 SPO 1997 10 18 08 30 44 3.6 -9 674.20 -59.3 -56.7 -57.8 68 -99 SPO 1997 10 18 08 31 46 3.6 -9 674.20 -59.4 -56.8 -57.8 68 -99 SPO 1997 10 18 08 32 47 3.8 -9 674.20 -59.3 -56.8 -57.8 67 -99 SPO 1997 10 18 08 33 46 3.8 -9 674.20 -59.3 -56.7 -57.9 67 -99 SPO 1997 10 18 08 34 44 3.6 -9 674.20 -59.4 -56.8 -57.9 68 -99 SPO 1997 10 18 08 35 42 3.6 -9 674.20 -59.5 -56.8 -57.8 70 -99 SPO 1997 10 18 08 36 43 3.8 -9 674.20 -59.4 -56.7 -57.8 68 -99 SPO 1997 10 18 08 37 41 3.8 -9 674.20 -59.4 -56.7 -57.8 68 -99 SPO 1997 10 18 08 38 43 3.9 -9 674.20 -59.4 -56.6 -57.9 68 -99 SPO 1997 10 18 08 39 42 3.8 -9 674.20 -59.4 -56.6 -57.9 68 -99 SPO 1997 10 18 08 40 41 3.8 -9 674.20 -59.4 -56.6 -57.8 68 -99 SPO 1997 10 18 08 41 40 3.9 -9 674.20 -59.4 -56.6 -57.8 68 -99 SPO 1997 10 18 08 42 40 3.9 -9 674.20 -59.4 -56.6 -57.8 67 -99 SPO 1997 10 18 08 43 40 4.1 -9 674.20 -59.4 -56.5 -57.8 67 -99 SPO 1997 10 18 08 44 41 3.8 -9 674.20 -59.4 -56.6 -57.8 67 -99 SPO 1997 10 18 08 45 42 3.9 -9 674.20 -59.4 -56.6 -57.8 67 -99 SPO 1997 10 18 08 46 41 3.9 -9 674.20 -59.4 -56.6 -57.8 68 -99 SPO 1997 10 18 08 47 39 3.7 -9 674.20 -59.4 -56.7 -57.7 68 -99 SPO 1997 10 18 08 48 41 3.5 -9 674.20 -59.3 -56.8 -57.6 68 -99 SPO 1997 10 18 08 49 42 3.6 -9 674.30 -59.3 -56.8 -57.6 69 -99 SPO 1997 10 18 08 50 41 3.6 -9 674.30 -59.3 -56.7 -57.7 69 -99 SPO 1997 10 18 08 51 43 3.4 -9 674.30 -59.3 -56.8 -57.6 69 -99 SPO 1997 10 18 08 52 44 3.4 -9 674.30 -59.2 -56.8 -57.6 69 -99 SPO 1997 10 18 08 53 45 3.3 -9 674.30 -59.2 -56.9 -57.5 69 -99 SPO 1997 10 18 08 54 46 3.4 -9 674.30 -59.2 -56.9 -57.5 68 -99 SPO 1997 10 18 08 55 48 3.5 -9 674.30 -59.3 -56.9 -57.6 69 -99 SPO 1997 10 18 08 56 48 3.5 -9 674.30 -59.3 -56.9 -57.7 68 -99 SPO 1997 10 18 08 57 46 3.4 -9 674.30 -59.4 -56.8 -57.7 68 -99 SPO 1997 10 18 08 58 43 3.4 -9 674.30 -59.5 -57.0 -57.7 69 -99 SPO 1997 10 18 08 59 42 3.4 -9 674.30 -59.6 -57.1 -57.8 70 -99 SPO 1997 10 18 09 00 43 3.5 -9 674.30 -59.6 -57.1 -57.8 70 0 SPO 1997 10 18 09 01 45 3.3 -9 674.30 -59.7 -57.1 -57.8 70 -99 SPO 1997 10 18 09 02 46 3.4 -9 674.30 -59.7 -57.1 -57.8 70 -99 SPO 1997 10 18 09 03 44 3.4 -9 674.30 -59.7 -57.1 -57.8 70 -99 SPO 1997 10 18 09 04 42 3.5 -9 674.30 -59.8 -57.1 -57.8 70 -99 SPO 1997 10 18 09 05 41 3.4 -9 674.30 -59.8 -57.0 -57.9 70 -99 SPO 1997 10 18 09 06 42 3.9 -9 674.20 -59.8 -57.0 -58.0 70 -99 SPO 1997 10 18 09 07 41 3.9 -9 674.20 -59.8 -56.9 -58.1 69 -99 SPO 1997 10 18 09 08 42 3.9 -9 674.20 -59.9 -56.9 -58.1 69 -99 SPO 1997 10 18 09 09 42 3.8 -9 674.20 -60.0 -56.9 -58.1 69 -99 SPO 1997 10 18 09 10 45 3.8 -9 674.20 -60.0 -57.0 -58.1 69 -99 SPO 1997 10 18 09 11 45 3.6 -9 674.20 -60.0 -56.9 -58.0 68 -99 SPO 1997 10 18 09 12 45 3.4 -9 674.30 -60.0 -57.0 -58.0 69 -99 SPO 1997 10 18 09 13 46 3.5 -9 674.30 -60.1 -57.0 -58.0 69 -99 SPO 1997 10 18 09 14 42 3.5 -9 674.30 -60.1 -57.2 -58.0 69 -99 SPO 1997 10 18 09 15 42 3.3 -9 674.30 -60.1 -57.2 -58.0 69 -99 SPO 1997 10 18 09 16 42 3.2 -9 674.30 -60.0 -57.2 -57.8 68 -99 SPO 1997 10 18 09 17 43 3.2 -9 674.30 -59.9 -57.3 -57.8 68 -99 SPO 1997 10 18 09 18 45 3.1 -9 674.30 -60.0 -57.3 -57.7 69 -99 SPO 1997 10 18 09 19 46 3.1 -9 674.30 -60.0 -57.3 -57.7 69 -99 SPO 1997 10 18 09 20 46 3.0 -9 674.30 -60.0 -57.4 -57.7 67 -99 SPO 1997 10 18 09 21 46 2.8 -9 674.30 -60.1 -57.4 -57.5 67 -99 SPO 1997 10 18 09 22 48 3.0 -9 674.30 -60.1 -57.3 -57.2 66 -99 SPO 1997 10 18 09 23 47 3.2 -9 674.30 -60.1 -57.2 -57.2 65 -99 SPO 1997 10 18 09 24 46 3.0 -9 674.30 -60.1 -57.3 -57.3 66 -99 SPO 1997 10 18 09 25 43 3.0 -9 674.30 -60.2 -57.3 -57.3 68 -99 SPO 1997 10 18 09 26 44 2.9 -9 674.30 -60.3 -57.2 -57.3 69 -99 SPO 1997 10 18 09 27 44 2.8 -9 674.30 -60.2 -57.2 -57.2 68 -99 SPO 1997 10 18 09 28 41 2.7 -9 674.40 -60.3 -57.3 -57.0 69 -99 SPO 1997 10 18 09 29 41 2.6 -9 674.30 -60.3 -57.3 -57.0 69 -99 SPO 1997 10 18 09 30 42 2.7 -9 674.30 -60.3 -57.4 -57.0 69 -99 SPO 1997 10 18 09 31 43 2.9 -9 674.30 -60.3 -57.4 -57.2 69 -99 SPO 1997 10 18 09 32 44 2.9 -9 674.30 -60.2 -57.4 -57.4 67 -99 SPO 1997 10 18 09 33 47 3.0 -9 674.30 -60.1 -57.4 -57.5 66 -99 SPO 1997 10 18 09 34 46 3.0 -9 674.30 -60.1 -57.4 -57.6 66 -99 SPO 1997 10 18 09 35 45 3.0 -9 674.30 -60.2 -57.4 -57.6 67 -99 SPO 1997 10 18 09 36 43 2.7 -9 674.40 -60.2 -57.4 -57.4 66 -99 SPO 1997 10 18 09 37 44 2.5 -9 674.40 -60.3 -57.4 -57.0 67 -99 SPO 1997 10 18 09 38 42 2.4 -9 674.40 -60.4 -57.3 -56.7 68 -99 SPO 1997 10 18 09 39 40 2.5 -9 674.40 -60.4 -57.2 -56.5 68 -99 SPO 1997 10 18 09 40 37 2.7 -9 674.40 -60.4 -57.2 -56.6 68 -99 SPO 1997 10 18 09 41 34 2.7 -9 674.40 -60.4 -57.2 -56.8 68 -99 SPO 1997 10 18 09 42 32 2.7 -9 674.50 -60.5 -57.1 -57.0 68 -99 SPO 1997 10 18 09 43 31 2.7 -9 674.50 -60.5 -57.0 -57.0 68 -99 SPO 1997 10 18 09 44 36 2.9 -9 674.40 -60.3 -56.9 -57.0 68 -99 SPO 1997 10 18 09 45 39 3.2 -9 674.40 -60.2 -56.8 -57.1 68 -99 SPO 1997 10 18 09 46 37 3.2 -9 674.40 -60.2 -56.8 -57.2 68 -99 SPO 1997 10 18 09 47 37 3.5 -9 674.40 -60.1 -56.8 -57.3 68 -99 SPO 1997 10 18 09 48 39 3.4 -9 674.40 -60.1 -56.7 -57.4 68 -99 SPO 1997 10 18 09 49 41 3.5 -9 674.40 -60.0 -56.7 -57.5 67 -99 SPO 1997 10 18 09 50 41 3.3 -9 674.40 -60.0 -56.8 -57.5 67 -99 SPO 1997 10 18 09 51 43 3.4 -9 674.40 -59.9 -56.8 -57.6 66 -99 SPO 1997 10 18 09 52 41 3.2 -9 674.40 -60.0 -56.9 -57.6 68 -99 SPO 1997 10 18 09 53 43 3.1 -9 674.40 -60.0 -57.0 -57.4 68 -99 SPO 1997 10 18 09 54 44 3.2 -9 674.40 -59.8 -57.0 -57.4 67 -99 SPO 1997 10 18 09 55 46 3.6 -9 674.40 -59.5 -56.9 -57.4 66 -99 SPO 1997 10 18 09 56 46 3.7 -9 674.40 -59.4 -56.7 -57.5 65 -99 SPO 1997 10 18 09 57 43 3.6 -9 674.40 -59.4 -56.7 -57.6 66 -99 SPO 1997 10 18 09 58 41 3.5 -9 674.50 -59.6 -56.7 -57.6 69 -99 SPO 1997 10 18 09 59 42 3.7 -9 674.50 -59.6 -56.6 -57.7 69 -99 SPO 1997 10 18 10 00 43 3.6 -9 674.50 -59.7 -56.6 -57.7 70 0 SPO 1997 10 18 10 01 45 3.5 -9 674.50 -59.7 -56.7 -57.7 69 -99 SPO 1997 10 18 10 02 47 3.5 -9 674.50 -59.8 -56.8 -57.6 69 -99 SPO 1997 10 18 10 03 49 3.6 -9 674.50 -59.8 -56.9 -57.7 68 -99 SPO 1997 10 18 10 04 50 3.6 -9 674.50 -59.9 -56.9 -57.8 68 -99 SPO 1997 10 18 10 05 48 3.5 -9 674.50 -60.0 -56.9 -57.9 69 -99 SPO 1997 10 18 10 06 45 3.5 -9 674.50 -60.2 -57.0 -57.9 69 -99 SPO 1997 10 18 10 07 44 3.5 -9 674.50 -60.3 -56.9 -57.9 70 -99 SPO 1997 10 18 10 08 44 3.5 -9 674.50 -60.3 -56.9 -57.9 69 -99 SPO 1997 10 18 10 09 41 3.3 -9 674.50 -60.3 -56.9 -57.8 69 -99 SPO 1997 10 18 10 10 38 3.3 -9 674.50 -60.1 -57.0 -57.6 68 -99 SPO 1997 10 18 10 11 40 3.4 -9 674.50 -59.9 -57.1 -57.6 67 -99 SPO 1997 10 18 10 12 40 3.4 -9 674.50 -59.7 -57.1 -57.6 66 -99 SPO 1997 10 18 10 13 38 3.5 -9 674.50 -59.6 -57.0 -57.6 67 -99 SPO 1997 10 18 10 14 38 3.7 -9 674.50 -59.5 -57.1 -57.5 67 -99 SPO 1997 10 18 10 15 37 3.7 -9 674.50 -59.4 -57.0 -57.5 67 -99 SPO 1997 10 18 10 16 37 3.8 -9 674.50 -59.3 -56.9 -57.5 66 -99 SPO 1997 10 18 10 17 40 3.7 -9 674.50 -59.2 -56.8 -57.4 66 -99 SPO 1997 10 18 10 18 43 3.7 -9 674.50 -59.2 -56.7 -57.4 67 -99 SPO 1997 10 18 10 19 42 3.5 -9 674.50 -59.2 -56.8 -57.4 67 -99 SPO 1997 10 18 10 20 42 3.6 -9 674.50 -59.2 -56.8 -57.3 67 -99 SPO 1997 10 18 10 21 42 3.7 -9 674.50 -59.1 -56.8 -57.3 67 -99 SPO 1997 10 18 10 22 40 3.7 -9 674.50 -59.1 -56.8 -57.4 68 -99 SPO 1997 10 18 10 23 39 3.7 -9 674.50 -59.0 -56.8 -57.3 67 -99 SPO 1997 10 18 10 24 39 3.7 -9 674.50 -59.0 -56.8 -57.2 69 -99 SPO 1997 10 18 10 25 39 3.7 -9 674.60 -58.9 -56.8 -57.2 68 -99 SPO 1997 10 18 10 26 41 3.6 -9 674.60 -58.9 -56.8 -57.2 69 -99 SPO 1997 10 18 10 27 42 3.6 -9 674.60 -59.0 -56.8 -57.3 70 -99 SPO 1997 10 18 10 28 40 3.5 -9 674.60 -59.1 -56.8 -57.3 71 -99 SPO 1997 10 18 10 29 39 3.5 -9 674.60 -59.1 -56.9 -57.3 70 -99 SPO 1997 10 18 10 30 41 3.5 -9 674.60 -59.1 -56.9 -57.3 69 -99 SPO 1997 10 18 10 31 40 3.6 -9 674.60 -59.0 -57.0 -57.3 68 -99 SPO 1997 10 18 10 32 43 3.7 -9 674.60 -58.9 -57.0 -57.3 68 -99 SPO 1997 10 18 10 33 44 3.8 -9 674.60 -59.0 -57.0 -57.3 69 -99 SPO 1997 10 18 10 34 45 3.7 -9 674.60 -59.1 -56.9 -57.4 70 -99 SPO 1997 10 18 10 35 46 3.6 -9 674.60 -59.2 -56.9 -57.4 71 -99 SPO 1997 10 18 10 36 46 3.4 -9 674.60 -59.2 -56.9 -57.4 71 -99 SPO 1997 10 18 10 37 44 3.2 -9 674.60 -59.3 -57.0 -57.3 71 -99 SPO 1997 10 18 10 38 45 3.3 -9 674.60 -59.2 -57.1 -57.3 71 -99 SPO 1997 10 18 10 39 45 3.2 -9 674.60 -59.2 -57.1 -57.3 71 -99 SPO 1997 10 18 10 40 45 3.3 -9 674.60 -59.2 -57.1 -57.3 71 -99 SPO 1997 10 18 10 41 45 3.3 -9 674.60 -59.3 -57.0 -57.3 71 -99 SPO 1997 10 18 10 42 46 3.2 -9 674.60 -59.3 -57.0 -57.3 71 -99 SPO 1997 10 18 10 43 46 3.1 -9 674.60 -59.4 -57.1 -57.2 70 -99 SPO 1997 10 18 10 44 48 3.3 -9 674.60 -59.4 -57.1 -57.3 70 -99 SPO 1997 10 18 10 45 48 3.3 -9 674.60 -59.4 -57.2 -57.3 69 -99 SPO 1997 10 18 10 46 45 3.4 -9 674.60 -59.9 -57.2 -57.3 73 -99 SPO 1997 10 18 10 47 44 3.4 -9 674.60 -60.4 -57.1 -57.4 76 -99 SPO 1997 10 18 10 48 44 3.5 -9 674.60 -60.2 -57.1 -57.5 72 -99 SPO 1997 10 18 10 49 43 3.6 -9 674.60 -59.8 -57.1 -57.6 67 -99 SPO 1997 10 18 10 50 42 3.7 -9 674.60 -59.6 -57.1 -57.6 67 -99 SPO 1997 10 18 10 51 43 3.7 -9 674.60 -59.5 -57.1 -57.7 68 -99 SPO 1997 10 18 10 52 45 3.7 -9 674.60 -59.5 -57.1 -57.8 69 -99 SPO 1997 10 18 10 53 43 3.8 -9 674.60 -59.5 -57.1 -57.8 69 -99 SPO 1997 10 18 10 54 42 3.8 -9 674.60 -59.5 -57.1 -57.8 69 -99 SPO 1997 10 18 10 55 41 3.8 -9 674.60 -59.5 -57.0 -57.7 69 -99 SPO 1997 10 18 10 56 40 3.9 -9 674.60 -59.4 -57.0 -57.6 67 -99 SPO 1997 10 18 10 57 40 3.9 -9 674.60 -59.4 -57.0 -57.7 67 -99 SPO 1997 10 18 10 58 40 4.0 -9 674.60 -59.3 -57.1 -57.6 66 -99 SPO 1997 10 18 10 59 41 4.0 -9 674.60 -59.2 -57.0 -57.6 66 -99 SPO 1997 10 18 11 00 41 4.0 -9 674.60 -59.2 -56.9 -57.6 67 0 SPO 1997 10 18 11 01 42 3.9 -9 674.60 -59.2 -56.9 -57.6 67 -99 SPO 1997 10 18 11 02 43 3.9 -9 674.60 -59.2 -57.0 -57.6 68 -99 SPO 1997 10 18 11 03 43 3.8 -9 674.60 -59.2 -57.0 -57.6 69 -99 SPO 1997 10 18 11 04 43 3.7 -9 674.60 -59.2 -57.0 -57.6 69 -99 SPO 1997 10 18 11 05 45 3.7 -9 674.60 -59.2 -57.0 -57.6 70 -99 SPO 1997 10 18 11 06 46 3.7 -9 674.60 -59.2 -57.0 -57.7 70 -99 SPO 1997 10 18 11 07 46 3.6 -9 674.60 -59.3 -57.0 -57.7 71 -99 SPO 1997 10 18 11 08 46 3.6 -9 674.60 -59.3 -57.0 -57.6 70 -99 SPO 1997 10 18 11 09 48 3.6 -9 674.60 -59.3 -57.0 -57.6 68 -99 SPO 1997 10 18 11 10 50 3.6 -9 674.60 -59.3 -57.1 -57.6 68 -99 SPO 1997 10 18 11 11 49 3.7 -9 674.60 -59.3 -57.1 -57.7 68 -99 SPO 1997 10 18 11 12 48 3.8 -9 674.60 -59.4 -57.1 -57.7 68 -99 SPO 1997 10 18 11 13 46 3.7 -9 674.60 -59.4 -57.1 -57.8 69 -99 SPO 1997 10 18 11 14 45 3.5 -9 674.60 -59.5 -57.2 -57.8 70 -99 SPO 1997 10 18 11 15 44 3.4 -9 674.60 -59.5 -57.2 -57.7 70 -99 SPO 1997 10 18 11 16 44 3.4 -9 674.60 -59.4 -57.2 -57.7 70 -99 SPO 1997 10 18 11 17 43 3.4 -9 674.60 -59.4 -57.1 -57.7 70 -99 SPO 1997 10 18 11 18 44 3.5 -9 674.60 -59.4 -57.1 -57.6 70 -99 SPO 1997 10 18 11 19 45 3.3 -9 674.60 -59.4 -57.1 -57.7 70 -99 SPO 1997 10 18 11 20 44 3.4 -9 674.60 -59.4 -57.1 -57.7 70 -99 SPO 1997 10 18 11 21 43 3.4 -9 674.60 -59.4 -57.1 -57.7 70 -99 SPO 1997 10 18 11 22 43 3.2 -9 674.60 -59.4 -57.2 -57.7 69 -99 SPO 1997 10 18 11 23 44 3.3 -9 674.60 -59.2 -57.2 -57.6 67 -99 SPO 1997 10 18 11 24 45 3.4 -9 674.60 -59.2 -57.2 -57.7 67 -99 SPO 1997 10 18 11 25 47 3.5 -9 674.60 -59.3 -57.1 -57.7 69 -99 SPO 1997 10 18 11 26 46 3.4 -9 674.60 -59.4 -57.0 -57.7 70 -99 SPO 1997 10 18 11 27 44 3.3 -9 674.60 -59.4 -57.0 -57.7 70 -99 SPO 1997 10 18 11 28 43 3.2 -9 674.70 -59.4 -57.1 -57.6 69 -99 SPO 1997 10 18 11 29 42 3.1 -9 674.70 -59.4 -57.2 -57.6 69 -99 SPO 1997 10 18 11 30 43 3.0 -9 674.70 -59.4 -57.2 -57.6 69 -99 SPO 1997 10 18 11 31 42 3.1 -9 674.70 -59.4 -57.1 -57.6 69 -99 SPO 1997 10 18 11 32 40 3.3 -9 674.60 -59.4 -57.0 -57.7 70 -99 SPO 1997 10 18 11 33 38 3.4 -9 674.60 -59.5 -57.0 -57.7 71 -99 SPO 1997 10 18 11 34 39 3.4 -9 674.60 -59.5 -57.0 -57.7 71 -99 SPO 1997 10 18 11 35 37 3.4 -9 674.60 -59.5 -56.9 -57.7 70 -99 SPO 1997 10 18 11 36 38 3.6 -9 674.60 -59.5 -56.8 -57.8 70 -99 SPO 1997 10 18 11 37 38 3.7 -9 674.60 -59.5 -56.8 -57.8 70 -99 SPO 1997 10 18 11 38 40 3.7 -9 674.50 -59.4 -56.7 -57.8 70 -99 SPO 1997 10 18 11 39 39 3.8 -9 674.50 -59.4 -56.8 -57.8 70 -99 SPO 1997 10 18 11 40 40 3.9 -9 674.50 -59.4 -56.8 -57.8 70 -99 SPO 1997 10 18 11 41 41 3.9 -9 674.50 -59.4 -56.6 -57.9 70 -99 SPO 1997 10 18 11 42 41 4.0 -9 674.50 -59.3 -56.6 -57.9 68 -99 SPO 1997 10 18 11 43 40 4.2 -9 674.50 -59.3 -56.5 -57.9 69 -99 SPO 1997 10 18 11 44 38 4.3 -9 674.50 -59.3 -56.5 -57.9 69 -99 SPO 1997 10 18 11 45 37 4.2 -9 674.50 -59.3 -56.4 -57.9 69 -99 SPO 1997 10 18 11 46 35 4.3 -9 674.50 -59.2 -56.5 -57.9 68 -99 SPO 1997 10 18 11 47 34 4.2 -9 674.50 -59.2 -56.6 -57.8 68 -99 SPO 1997 10 18 11 48 34 4.3 -9 674.50 -59.1 -56.6 -57.8 67 -99 SPO 1997 10 18 11 49 35 4.5 -9 674.50 -59.0 -56.5 -57.8 66 -99 SPO 1997 10 18 11 50 36 4.5 -9 674.50 -59.0 -56.4 -57.9 66 -99 SPO 1997 10 18 11 51 36 4.5 -9 674.50 -59.0 -56.4 -58.0 67 -99 SPO 1997 10 18 11 52 36 4.5 -9 674.50 -59.1 -56.5 -58.0 68 -99 SPO 1997 10 18 11 53 34 4.4 -9 674.50 -59.1 -56.5 -58.1 68 -99 SPO 1997 10 18 11 54 32 4.3 -9 674.50 -59.1 -56.6 -58.1 68 -99 SPO 1997 10 18 11 55 31 4.2 -9 674.60 -59.1 -56.6 -58.1 68 -99 SPO 1997 10 18 11 56 31 4.4 -9 674.60 -59.1 -56.5 -58.0 68 -99 SPO 1997 10 18 11 57 31 4.4 -9 674.60 -59.0 -56.5 -58.0 68 -99 SPO 1997 10 18 11 58 30 4.4 -9 674.60 -59.0 -56.4 -58.0 68 -99 SPO 1997 10 18 11 59 30 4.3 -9 674.60 -58.9 -56.3 -57.8 67 -99 SPO 1997 10 18 12 00 31 4.4 -9 674.60 -58.8 -56.4 -57.8 66 0 SPO 1997 10 18 12 01 30 4.3 -9 674.60 -58.8 -56.4 -57.7 66 -99 SPO 1997 10 18 12 02 30 4.3 -9 674.70 -58.8 -56.4 -57.7 66 -99 SPO 1997 10 18 12 03 30 4.2 -9 674.70 -58.8 -56.4 -57.7 67 -99 SPO 1997 10 18 12 04 30 4.3 -9 674.70 -58.6 -56.3 -57.6 66 -99 SPO 1997 10 18 12 05 31 4.4 -9 674.70 -58.5 -56.3 -57.6 66 -99 SPO 1997 10 18 12 06 32 4.3 -9 674.70 -58.6 -56.4 -57.6 67 -99 SPO 1997 10 18 12 07 31 4.3 -9 674.70 -58.6 -56.4 -57.6 68 -99 SPO 1997 10 18 12 08 30 4.5 -9 674.70 -58.6 -56.4 -57.6 68 -99 SPO 1997 10 18 12 09 30 4.5 -9 674.70 -58.6 -56.3 -57.6 68 -99 SPO 1997 10 18 12 10 29 4.5 -9 674.70 -58.5 -56.3 -57.6 69 -99 SPO 1997 10 18 12 11 29 4.7 -9 674.70 -58.5 -56.4 -57.7 70 -99 SPO 1997 10 18 12 12 27 5.0 -9 674.70 -58.5 -56.3 -57.7 70 -99 SPO 1997 10 18 12 13 27 5.1 -9 674.70 -58.5 -56.4 -57.7 70 -99 SPO 1997 10 18 12 14 27 5.0 -9 674.70 -58.5 -56.3 -57.7 69 -99 SPO 1997 10 18 12 15 28 5.2 -9 674.70 -58.4 -56.3 -57.7 69 -99 SPO 1997 10 18 12 16 27 5.2 -9 674.70 -58.4 -56.3 -57.7 69 -99 SPO 1997 10 18 12 17 27 5.2 -9 674.70 -58.4 -56.3 -57.7 70 -99 SPO 1997 10 18 12 18 28 5.2 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 19 29 5.0 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 20 30 5.0 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 21 31 4.9 -9 674.70 -58.4 -56.1 -57.7 70 -99 SPO 1997 10 18 12 22 32 5.0 -9 674.70 -58.4 -56.1 -57.7 70 -99 SPO 1997 10 18 12 23 31 4.9 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 24 31 4.7 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 25 31 4.7 -9 674.70 -58.4 -56.2 -57.7 70 -99 SPO 1997 10 18 12 26 31 4.8 -9 674.70 -58.4 -56.3 -57.7 69 -99 SPO 1997 10 18 12 27 29 4.7 -9 674.70 -58.4 -56.3 -57.7 68 -99 SPO 1997 10 18 12 28 29 4.7 -9 674.70 -58.4 -56.4 -57.7 68 -99 SPO 1997 10 18 12 29 28 4.5 -9 674.70 -58.3 -56.4 -57.7 67 -99 SPO 1997 10 18 12 30 29 4.4 -9 674.70 -58.3 -56.4 -57.7 69 -99 SPO 1997 10 18 12 31 30 4.3 -9 674.70 -58.3 -56.4 -57.6 69 -99 SPO 1997 10 18 12 32 32 4.4 -9 674.70 -58.3 -56.4 -57.6 69 -99 SPO 1997 10 18 12 33 32 4.3 -9 674.70 -58.3 -56.4 -57.6 70 -99 SPO 1997 10 18 12 34 32 4.4 -9 674.70 -58.3 -56.4 -57.6 70 -99 SPO 1997 10 18 12 35 32 4.4 -9 674.80 -58.4 -56.4 -57.6 71 -99 SPO 1997 10 18 12 36 32 4.3 -9 674.80 -58.4 -56.4 -57.6 71 -99 SPO 1997 10 18 12 37 34 4.4 -9 674.80 -58.4 -56.4 -57.6 70 -99 SPO 1997 10 18 12 38 35 4.2 -9 674.80 -58.3 -56.4 -57.6 69 -99 SPO 1997 10 18 12 39 34 4.0 -9 674.80 -58.3 -56.5 -57.5 68 -99 SPO 1997 10 18 12 40 36 3.8 -9 674.90 -58.3 -56.5 -57.4 68 -99 SPO 1997 10 18 12 41 36 3.9 -9 674.80 -58.2 -56.5 -57.4 68 -99 SPO 1997 10 18 12 42 35 3.9 -9 674.80 -58.2 -56.6 -57.4 69 -99 SPO 1997 10 18 12 43 36 4.0 -9 674.80 -58.2 -56.6 -57.4 70 -99 SPO 1997 10 18 12 44 38 3.9 -9 674.80 -58.2 -56.6 -57.4 70 -99 SPO 1997 10 18 12 45 40 4.2 -9 674.80 -58.2 -56.4 -57.4 70 -99 SPO 1997 10 18 12 46 39 4.0 -9 674.80 -58.2 -56.4 -57.4 70 -99 SPO 1997 10 18 12 47 39 3.9 -9 674.80 -58.2 -56.5 -57.3 71 -99 SPO 1997 10 18 12 48 37 4.0 -9 674.80 -58.2 -56.6 -57.3 71 -99 SPO 1997 10 18 12 49 38 4.0 -9 674.80 -58.2 -56.6 -57.3 71 -99 SPO 1997 10 18 12 50 38 4.0 -9 674.80 -58.2 -56.6 -57.3 70 -99 SPO 1997 10 18 12 51 37 3.9 -9 674.90 -58.2 -56.6 -57.3 70 -99 SPO 1997 10 18 12 52 36 3.8 -9 674.90 -58.2 -56.7 -57.3 69 -99 SPO 1997 10 18 12 53 36 3.9 -9 674.90 -58.1 -56.7 -57.2 69 -99 SPO 1997 10 18 12 54 36 3.9 -9 674.90 -58.1 -56.6 -57.2 69 -99 SPO 1997 10 18 12 55 36 4.0 -9 675.00 -58.1 -56.6 -57.2 70 -99 SPO 1997 10 18 12 56 36 3.7 -9 675.00 -58.0 -56.6 -57.2 70 -99 SPO 1997 10 18 12 57 36 3.6 -9 675.00 -58.0 -56.6 -57.1 70 -99 SPO 1997 10 18 12 58 37 3.6 -9 675.00 -58.0 -56.6 -57.0 71 -99 SPO 1997 10 18 12 59 38 3.8 -9 675.00 -58.0 -56.6 -57.0 71 -99 SPO 1997 10 18 13 00 36 3.9 -9 675.00 -57.9 -56.5 -57.0 71 0 SPO 1997 10 18 13 01 36 3.9 -9 675.00 -57.8 -56.5 -57.0 69 -99 SPO 1997 10 18 13 02 37 4.0 -9 675.00 -57.7 -56.5 -56.9 69 -99 SPO 1997 10 18 13 03 38 4.0 -9 675.00 -57.8 -56.5 -56.9 70 -99 SPO 1997 10 18 13 04 37 4.0 -9 674.90 -57.8 -56.5 -57.0 69 -99 SPO 1997 10 18 13 05 36 4.0 -9 675.00 -57.8 -56.5 -57.0 69 -99 SPO 1997 10 18 13 06 35 4.0 -9 675.00 -57.8 -56.6 -57.0 69 -99 SPO 1997 10 18 13 07 33 4.0 -9 675.00 -57.8 -56.6 -57.0 70 -99 SPO 1997 10 18 13 08 32 4.1 -9 675.00 -57.8 -56.6 -56.9 70 -99 SPO 1997 10 18 13 09 33 4.2 -9 675.00 -57.7 -56.6 -56.9 70 -99 SPO 1997 10 18 13 10 36 4.2 -9 675.00 -57.7 -56.7 -56.9 71 -99 SPO 1997 10 18 13 11 38 4.1 -9 675.00 -57.7 -56.6 -56.9 71 -99 SPO 1997 10 18 13 12 39 4.1 -9 675.00 -57.6 -56.6 -56.9 70 -99 SPO 1997 10 18 13 13 36 4.2 -9 675.00 -57.6 -56.6 -56.8 70 -99 SPO 1997 10 18 13 14 37 4.3 -9 675.00 -57.4 -56.6 -56.8 68 -99 SPO 1997 10 18 13 15 38 4.1 -9 675.00 -57.4 -56.6 -56.7 68 -99 SPO 1997 10 18 13 16 36 4.0 -9 675.00 -57.4 -56.6 -56.8 67 -99 SPO 1997 10 18 13 17 36 4.0 -9 675.00 -57.5 -56.6 -56.8 68 -99 SPO 1997 10 18 13 18 35 4.0 -9 675.00 -57.6 -56.6 -56.9 69 -99 SPO 1997 10 18 13 19 35 4.1 -9 675.00 -57.6 -56.6 -56.9 69 -99 SPO 1997 10 18 13 20 34 4.2 -9 675.00 -57.5 -56.5 -56.9 69 -99 SPO 1997 10 18 13 21 35 4.3 -9 675.00 -57.4 -56.5 -56.8 68 -99 SPO 1997 10 18 13 22 37 4.1 -9 675.00 -57.3 -56.6 -56.7 67 -99 SPO 1997 10 18 13 23 37 4.2 -9 675.00 -57.4 -56.6 -56.7 68 -99 SPO 1997 10 18 13 24 36 4.1 -9 675.00 -57.4 -56.7 -56.8 68 -99 SPO 1997 10 18 13 25 35 4.1 -9 675.00 -57.6 -56.8 -56.9 69 -99 SPO 1997 10 18 13 26 35 4.1 -9 675.00 -57.6 -56.8 -57.0 68 -99 SPO 1997 10 18 13 27 35 3.9 -9 675.00 -57.7 -56.8 -57.0 68 -99 SPO 1997 10 18 13 28 36 3.9 -9 675.00 -57.7 -56.8 -57.0 67 -99 SPO 1997 10 18 13 29 37 3.9 -9 675.00 -57.8 -56.9 -57.1 67 -99 SPO 1997 10 18 13 30 36 4.0 -9 675.00 -57.8 -56.8 -57.1 67 -99 SPO 1997 10 18 13 31 34 4.0 -9 675.00 -57.8 -56.8 -57.1 67 -99 SPO 1997 10 18 13 32 33 4.0 -9 675.00 -57.8 -56.7 -57.1 67 -99 SPO 1997 10 18 13 33 32 3.8 -9 675.00 -57.8 -56.7 -57.1 67 -99 SPO 1997 10 18 13 34 33 3.7 -9 675.00 -57.7 -56.7 -57.1 66 -99 SPO 1997 10 18 13 35 33 3.7 -9 675.00 -57.8 -56.6 -57.1 67 -99 SPO 1997 10 18 13 36 34 3.6 -9 675.00 -57.8 -56.5 -57.1 67 -99 SPO 1997 10 18 13 37 35 3.6 -9 675.00 -57.8 -56.6 -57.0 68 -99 SPO 1997 10 18 13 38 36 3.7 -9 675.00 -57.8 -56.6 -57.0 67 -99 SPO 1997 10 18 13 39 35 3.7 -9 675.00 -57.8 -56.5 -57.1 67 -99 SPO 1997 10 18 13 40 34 3.8 -9 675.00 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 18 13 41 34 3.8 -9 675.10 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 18 13 42 33 3.7 -9 675.10 -58.0 -56.5 -57.2 66 -99 SPO 1997 10 18 13 43 32 3.8 -9 675.10 -58.0 -56.6 -57.2 66 -99 SPO 1997 10 18 13 44 33 3.8 -9 675.10 -57.9 -56.7 -57.2 66 -99 SPO 1997 10 18 13 45 34 3.8 -9 675.10 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 18 13 46 34 3.8 -9 675.10 -58.0 -56.6 -57.1 67 -99 SPO 1997 10 18 13 47 32 3.8 -9 675.10 -57.9 -56.6 -57.1 67 -99 SPO 1997 10 18 13 48 32 3.9 -9 675.10 -57.9 -56.5 -57.1 67 -99 SPO 1997 10 18 13 49 33 3.8 -9 675.20 -57.9 -56.5 -57.0 67 -99 SPO 1997 10 18 13 50 35 3.6 -9 675.20 -57.8 -56.6 -57.0 66 -99 SPO 1997 10 18 13 51 36 3.7 -9 675.20 -58.0 -56.6 -57.1 67 -99 SPO 1997 10 18 13 52 34 3.9 -9 675.20 -58.0 -56.6 -57.2 67 -99 SPO 1997 10 18 13 53 33 3.9 -9 675.20 -58.1 -56.6 -57.2 67 -99 SPO 1997 10 18 13 54 32 3.9 -9 675.20 -58.1 -56.6 -57.3 66 -99 SPO 1997 10 18 13 55 32 4.0 -9 675.20 -58.2 -56.6 -57.3 66 -99 SPO 1997 10 18 13 56 33 4.1 -9 675.20 -58.2 -56.5 -57.3 66 -99 SPO 1997 10 18 13 57 32 4.2 -9 675.20 -58.1 -56.5 -57.3 66 -99 SPO 1997 10 18 13 58 31 4.2 -9 675.10 -58.0 -56.5 -57.2 65 -99 SPO 1997 10 18 13 59 29 4.2 -9 675.20 -58.0 -56.5 -57.2 66 -99 SPO 1997 10 18 14 00 29 4.2 -9 675.20 -57.9 -56.4 -57.2 65 0 SPO 1997 10 18 14 01 28 4.2 -9 675.20 -57.9 -56.4 -57.2 65 -99 SPO 1997 10 18 14 02 27 4.2 -9 675.20 -57.9 -56.5 -57.2 65 -99 SPO 1997 10 18 14 03 27 4.2 -9 675.20 -57.9 -56.5 -57.2 65 -99 SPO 1997 10 18 14 04 28 4.2 -9 675.20 -57.9 -56.4 -57.2 64 -99 SPO 1997 10 18 14 05 28 4.3 -9 675.20 -57.9 -56.4 -57.2 64 -99 SPO 1997 10 18 14 06 28 4.3 -9 675.20 -58.0 -56.4 -57.2 63 -99 SPO 1997 10 18 14 07 28 4.3 -9 675.20 -57.9 -56.4 -57.2 64 -99 SPO 1997 10 18 14 08 28 4.5 -9 675.10 -57.9 -56.5 -57.2 64 -99 SPO 1997 10 18 14 09 28 4.4 -9 675.10 -57.9 -56.5 -57.2 65 -99 SPO 1997 10 18 14 10 29 4.4 -9 675.20 -57.8 -56.5 -57.2 64 -99 SPO 1997 10 18 14 11 30 4.5 -9 675.10 -57.9 -56.5 -57.2 66 -99 SPO 1997 10 18 14 12 31 4.5 -9 675.10 -57.9 -56.4 -57.2 66 -99 SPO 1997 10 18 14 13 31 4.5 -9 675.10 -57.9 -56.4 -57.2 66 -99 SPO 1997 10 18 14 14 31 4.4 -9 675.20 -57.9 -56.4 -57.2 66 -99 SPO 1997 10 18 14 15 29 4.5 -9 675.20 -57.9 -56.4 -57.2 65 -99 SPO 1997 10 18 14 16 26 4.4 -9 675.20 -57.9 -56.4 -57.2 64 -99 SPO 1997 10 18 14 17 26 4.4 -9 675.20 -57.8 -56.4 -57.2 62 -99 SPO 1997 10 18 14 18 25 4.6 -9 675.20 -57.8 -56.4 -57.1 62 -99 SPO 1997 10 18 14 19 25 4.8 -9 675.10 -57.8 -56.4 -57.1 63 -99 SPO 1997 10 18 14 20 24 4.6 -9 675.10 -57.8 -56.4 -57.1 63 -99 SPO 1997 10 18 14 21 24 4.6 -9 675.10 -57.7 -56.4 -57.1 64 -99 SPO 1997 10 18 14 22 26 4.5 -9 675.20 -57.8 -56.4 -57.0 65 -99 SPO 1997 10 18 14 23 26 4.5 -9 675.10 -57.7 -56.3 -57.0 65 -99 SPO 1997 10 18 14 24 27 4.6 -9 675.10 -57.7 -56.3 -57.0 65 -99 SPO 1997 10 18 14 25 27 4.5 -9 675.20 -57.7 -56.3 -57.0 65 -99 SPO 1997 10 18 14 26 28 4.4 -9 675.20 -57.8 -56.3 -57.0 67 -99 SPO 1997 10 18 14 27 28 4.4 -9 675.20 -57.8 -56.2 -57.1 66 -99 SPO 1997 10 18 14 28 27 4.4 -9 675.20 -57.8 -56.2 -57.0 65 -99 SPO 1997 10 18 14 29 27 4.5 -9 675.20 -57.8 -56.2 -57.0 64 -99 SPO 1997 10 18 14 30 27 4.5 -9 675.20 -57.8 -56.2 -57.0 64 -99 SPO 1997 10 18 14 31 27 4.4 -9 675.20 -57.8 -56.2 -57.0 64 -99 SPO 1997 10 18 14 32 27 4.3 -9 675.20 -57.7 -56.1 -56.9 63 -99 SPO 1997 10 18 14 33 27 4.2 -9 675.20 -57.7 -56.1 -56.9 64 -99 SPO 1997 10 18 14 34 27 4.2 -9 675.20 -57.6 -56.1 -56.8 63 -99 SPO 1997 10 18 14 35 28 4.2 -9 675.20 -57.6 -56.1 -56.8 63 -99 SPO 1997 10 18 14 36 27 4.2 -9 675.20 -57.7 -56.2 -56.8 65 -99 SPO 1997 10 18 14 37 27 4.3 -9 675.20 -57.7 -56.3 -56.8 66 -99 SPO 1997 10 18 14 38 27 4.4 -9 675.20 -57.7 -56.3 -56.8 66 -99 SPO 1997 10 18 14 39 27 4.5 -9 675.20 -57.7 -56.3 -56.8 65 -99 SPO 1997 10 18 14 40 28 4.4 -9 675.20 -57.7 -56.3 -56.8 64 -99 SPO 1997 10 18 14 41 30 4.4 -9 675.20 -57.7 -56.3 -56.8 64 -99 SPO 1997 10 18 14 42 31 4.4 -9 675.20 -57.7 -56.2 -56.8 64 -99 SPO 1997 10 18 14 43 31 4.3 -9 675.20 -57.8 -56.2 -56.8 65 -99 SPO 1997 10 18 14 44 30 4.2 -9 675.20 -57.8 -56.2 -56.8 66 -99 SPO 1997 10 18 14 45 30 4.2 -9 675.20 -57.7 -56.3 -56.8 65 -99 SPO 1997 10 18 14 46 30 4.3 -9 675.20 -57.7 -56.3 -56.8 65 -99 SPO 1997 10 18 14 47 28 4.3 -9 675.20 -57.8 -56.3 -56.8 66 -99 SPO 1997 10 18 14 48 27 4.3 -9 675.20 -57.7 -56.2 -56.8 66 -99 SPO 1997 10 18 14 49 26 4.5 -9 675.20 -57.7 -56.2 -56.8 65 -99 SPO 1997 10 18 14 50 27 4.5 -9 675.20 -57.6 -56.1 -56.8 64 -99 SPO 1997 10 18 14 51 29 4.5 -9 675.20 -57.6 -56.0 -56.7 63 -99 SPO 1997 10 18 14 52 29 4.4 -9 675.20 -57.6 -56.1 -56.7 63 -99 SPO 1997 10 18 14 53 29 4.3 -9 675.20 -57.6 -56.1 -56.7 63 -99 SPO 1997 10 18 14 54 30 4.3 -9 675.20 -57.7 -56.2 -56.8 63 -99 SPO 1997 10 18 14 55 30 4.3 -9 675.20 -57.8 -56.2 -56.8 64 -99 SPO 1997 10 18 14 56 31 4.2 -9 675.20 -57.8 -56.2 -56.8 65 -99 SPO 1997 10 18 14 57 31 4.2 -9 675.20 -57.8 -56.2 -56.8 65 -99 SPO 1997 10 18 14 58 30 4.3 -9 675.20 -57.8 -56.2 -56.8 65 -99 SPO 1997 10 18 14 59 29 4.5 -9 675.20 -57.8 -56.1 -56.8 65 -99 SPO 1997 10 18 15 00 30 4.3 -9 675.20 -57.7 -56.0 -56.8 64 0 SPO 1997 10 18 15 01 29 4.4 -9 675.20 -57.7 -56.1 -56.8 65 -99 SPO 1997 10 18 15 02 29 4.2 -9 675.20 -57.7 -56.1 -56.8 65 -99 SPO 1997 10 18 15 03 29 4.1 -9 675.30 -57.7 -56.2 -56.8 64 -99 SPO 1997 10 18 15 04 30 4.4 -9 675.30 -57.7 -56.2 -56.8 64 -99 SPO 1997 10 18 15 05 29 4.2 -9 675.30 -57.6 -56.2 -56.8 63 -99 SPO 1997 10 18 15 06 29 4.4 -9 675.30 -57.6 -56.1 -56.8 63 -99 SPO 1997 10 18 15 07 29 4.2 -9 675.20 -57.6 -56.2 -56.8 63 -99 SPO 1997 10 18 15 08 30 4.5 -9 675.20 -57.6 -56.2 -56.8 63 -99 SPO 1997 10 18 15 09 30 4.3 -9 675.20 -57.5 -56.2 -56.7 63 -99 SPO 1997 10 18 15 10 30 4.4 -9 675.20 -57.6 -56.3 -56.8 65 -99 SPO 1997 10 18 15 11 29 4.5 -9 675.20 -57.6 -56.4 -56.8 65 -99 SPO 1997 10 18 15 12 28 4.5 -9 675.20 -57.7 -56.4 -56.9 66 -99 SPO 1997 10 18 15 13 28 4.5 -9 675.20 -57.7 -56.4 -56.9 66 -99 SPO 1997 10 18 15 14 29 4.6 -9 675.20 -57.6 -56.3 -56.9 65 -99 SPO 1997 10 18 15 15 28 4.6 -9 675.20 -57.6 -56.3 -56.9 64 -99 SPO 1997 10 18 15 16 28 4.6 -9 675.20 -57.7 -56.3 -57.0 65 -99 SPO 1997 10 18 15 17 27 4.7 -9 675.20 -57.7 -56.2 -57.0 64 -99 SPO 1997 10 18 15 18 27 4.9 -9 675.20 -57.7 -56.2 -57.0 64 -99 SPO 1997 10 18 15 19 26 5.1 -9 675.20 -57.6 -56.2 -57.0 63 -99 SPO 1997 10 18 15 20 26 5.0 -9 675.20 -57.6 -56.1 -57.0 63 -99 SPO 1997 10 18 15 21 26 5.2 -9 675.20 -57.5 -56.0 -56.9 63 -99 SPO 1997 10 18 15 22 25 5.3 -9 675.20 -57.5 -55.9 -56.9 63 -99 SPO 1997 10 18 15 23 24 5.4 -9 675.20 -57.4 -55.8 -56.9 63 -99 SPO 1997 10 18 15 24 24 5.5 -9 675.20 -57.3 -55.8 -56.8 63 -99 SPO 1997 10 18 15 25 23 5.5 -9 675.20 -57.3 -55.8 -56.8 63 -99 SPO 1997 10 18 15 26 23 5.5 -9 675.20 -57.3 -55.7 -56.8 63 -99 SPO 1997 10 18 15 27 23 5.4 -9 675.20 -57.2 -55.6 -56.7 63 -99 SPO 1997 10 18 15 28 23 5.3 -9 675.20 -57.2 -55.6 -56.7 63 -99 SPO 1997 10 18 15 29 22 5.1 -9 675.20 -57.2 -55.7 -56.7 63 -99 SPO 1997 10 18 15 30 22 5.3 -9 675.20 -57.3 -55.7 -56.7 63 -99 SPO 1997 10 18 15 31 22 5.2 -9 675.20 -57.2 -55.7 -56.7 63 -99 SPO 1997 10 18 15 32 22 5.2 -9 675.20 -57.2 -55.7 -56.6 63 -99 SPO 1997 10 18 15 33 23 5.2 -9 675.30 -57.2 -55.7 -56.6 63 -99 SPO 1997 10 18 15 34 23 5.1 -9 675.30 -57.2 -55.7 -56.6 63 -99 SPO 1997 10 18 15 35 23 5.1 -9 675.30 -57.2 -55.7 -56.6 63 -99 SPO 1997 10 18 15 36 23 5.2 -9 675.30 -57.2 -55.7 -56.6 64 -99 SPO 1997 10 18 15 37 23 4.8 -9 675.30 -57.2 -55.8 -56.6 64 -99 SPO 1997 10 18 15 38 24 4.7 -9 675.30 -57.1 -55.9 -56.5 63 -99 SPO 1997 10 18 15 39 26 4.6 -9 675.30 -57.1 -55.9 -56.5 63 -99 SPO 1997 10 18 15 40 27 4.4 -9 675.30 -57.1 -55.9 -56.4 63 -99 SPO 1997 10 18 15 41 26 4.4 -9 675.30 -57.1 -55.9 -56.4 62 -99 SPO 1997 10 18 15 42 27 4.4 -9 675.30 -57.1 -55.9 -56.4 63 -99 SPO 1997 10 18 15 43 28 4.3 -9 675.30 -57.1 -55.9 -56.4 63 -99 SPO 1997 10 18 15 44 29 4.2 -9 675.40 -57.2 -56.0 -56.4 64 -99 SPO 1997 10 18 15 45 29 4.3 -9 675.40 -57.1 -56.0 -56.3 64 -99 SPO 1997 10 18 15 46 29 4.1 -9 675.40 -57.1 -56.0 -56.3 64 -99 SPO 1997 10 18 15 47 29 4.2 -9 675.40 -57.2 -56.0 -56.3 66 -99 SPO 1997 10 18 15 48 30 4.3 -9 675.40 -57.1 -56.0 -56.3 65 -99 SPO 1997 10 18 15 49 31 4.5 -9 675.30 -57.2 -56.0 -56.4 66 -99 SPO 1997 10 18 15 50 30 4.4 -9 675.30 -57.2 -56.0 -56.4 66 -99 SPO 1997 10 18 15 51 30 4.3 -9 675.30 -57.2 -56.0 -56.5 65 -99 SPO 1997 10 18 15 52 29 4.4 -9 675.30 -57.2 -55.9 -56.5 65 -99 SPO 1997 10 18 15 53 28 4.5 -9 675.30 -57.2 -55.9 -56.4 63 -99 SPO 1997 10 18 15 54 28 4.5 -9 675.30 -57.2 -55.8 -56.5 63 -99 SPO 1997 10 18 15 55 28 4.6 -9 675.30 -57.2 -55.8 -56.4 63 -99 SPO 1997 10 18 15 56 28 4.7 -9 675.30 -57.1 -55.8 -56.4 63 -99 SPO 1997 10 18 15 57 28 4.8 -9 675.30 -57.1 -55.7 -56.4 63 -99 SPO 1997 10 18 15 58 27 4.7 -9 675.30 -57.0 -55.6 -56.4 63 -99 SPO 1997 10 18 15 59 28 4.7 -9 675.30 -57.1 -55.6 -56.4 64 -99 SPO 1997 10 18 16 00 28 4.8 -9 675.30 -57.1 -55.7 -56.4 64 0 SPO 1997 10 18 16 01 29 4.7 -9 675.40 -57.1 -55.8 -56.4 64 -99 SPO 1997 10 18 16 02 30 4.6 -9 675.40 -57.1 -55.9 -56.4 64 -99 SPO 1997 10 18 16 03 31 4.5 -9 675.40 -57.1 -56.0 -56.4 64 -99 SPO 1997 10 18 16 04 31 4.4 -9 675.40 -57.2 -56.0 -56.5 64 -99 SPO 1997 10 18 16 05 33 4.2 -9 675.40 -57.1 -56.0 -56.4 63 -99 SPO 1997 10 18 16 06 34 4.0 -9 675.40 -57.2 -56.1 -56.4 63 -99 SPO 1997 10 18 16 07 36 3.9 -9 675.50 -57.2 -56.1 -56.4 63 -99 SPO 1997 10 18 16 08 40 3.6 -9 675.50 -57.2 -56.2 -56.4 64 -99 SPO 1997 10 18 16 09 40 3.7 -9 675.50 -57.3 -56.2 -56.4 65 -99 SPO 1997 10 18 16 10 38 3.8 -9 675.50 -57.2 -56.2 -56.4 64 -99 SPO 1997 10 18 16 11 37 4.0 -9 675.50 -57.2 -56.1 -56.3 64 -99 SPO 1997 10 18 16 12 34 4.1 -9 675.40 -57.2 -56.1 -56.4 64 -99 SPO 1997 10 18 16 13 32 4.3 -9 675.40 -57.2 -56.0 -56.4 64 -99 SPO 1997 10 18 16 14 29 4.5 -9 675.40 -57.2 -56.0 -56.4 64 -99 SPO 1997 10 18 16 15 29 4.6 -9 675.40 -57.2 -56.0 -56.5 64 -99 SPO 1997 10 18 16 16 27 4.8 -9 675.40 -57.1 -55.9 -56.5 63 -99 SPO 1997 10 18 16 17 28 4.9 -9 675.40 -57.0 -55.8 -56.4 63 -99 SPO 1997 10 18 16 18 27 4.8 -9 675.40 -57.0 -55.9 -56.4 63 -99 SPO 1997 10 18 16 19 27 4.9 -9 675.40 -57.0 -55.9 -56.5 63 -99 SPO 1997 10 18 16 20 28 4.8 -9 675.40 -57.1 -55.9 -56.5 63 -99 SPO 1997 10 18 16 21 29 4.8 -9 675.40 -57.1 -55.8 -56.5 64 -99 SPO 1997 10 18 16 22 29 4.8 -9 675.40 -57.0 -55.8 -56.5 63 -99 SPO 1997 10 18 16 23 29 4.8 -9 675.50 -57.0 -55.7 -56.5 63 -99 SPO 1997 10 18 16 24 29 4.7 -9 675.50 -57.0 -55.8 -56.5 64 -99 SPO 1997 10 18 16 25 29 4.7 -9 675.50 -57.0 -55.6 -56.4 64 -99 SPO 1997 10 18 16 26 29 4.8 -9 675.50 -57.0 -55.7 -56.4 64 -99 SPO 1997 10 18 16 27 30 4.7 -9 675.50 -56.9 -55.7 -56.4 63 -99 SPO 1997 10 18 16 28 29 4.8 -9 675.50 -56.9 -55.7 -56.4 63 -99 SPO 1997 10 18 16 29 31 4.8 -9 675.50 -56.9 -55.6 -56.4 63 -99 SPO 1997 10 18 16 30 31 4.9 -9 675.50 -56.9 -55.6 -56.4 63 -99 SPO 1997 10 18 16 31 30 4.7 -9 675.50 -56.9 -55.6 -56.4 63 -99 SPO 1997 10 18 16 32 30 4.7 -9 675.50 -56.9 -55.6 -56.4 63 -99 SPO 1997 10 18 16 33 29 4.6 -9 675.50 -56.9 -55.7 -56.4 63 -99 SPO 1997 10 18 16 34 31 4.5 -9 675.50 -56.9 -55.7 -56.4 63 -99 SPO 1997 10 18 16 35 32 4.6 -9 675.50 -56.9 -55.7 -56.3 64 -99 SPO 1997 10 18 16 36 33 4.3 -9 675.50 -56.9 -55.8 -56.3 64 -99 SPO 1997 10 18 16 37 34 4.2 -9 675.50 -56.9 -55.8 -56.3 64 -99 SPO 1997 10 18 16 38 37 4.1 -9 675.50 -56.9 -55.7 -56.3 64 -99 SPO 1997 10 18 16 39 39 4.1 -9 675.50 -56.9 -55.6 -56.2 64 -99 SPO 1997 10 18 16 40 39 4.0 -9 675.50 -56.9 -55.6 -56.2 64 -99 SPO 1997 10 18 16 41 38 4.1 -9 675.50 -56.9 -55.6 -56.2 64 -99 SPO 1997 10 18 16 42 37 4.0 -9 675.50 -56.9 -55.7 -56.2 64 -99 SPO 1997 10 18 16 43 36 4.2 -9 675.50 -56.9 -55.8 -56.2 64 -99 SPO 1997 10 18 16 44 39 4.2 -9 675.50 -56.8 -55.8 -56.2 64 -99 SPO 1997 10 18 16 45 40 4.0 -9 675.60 -56.9 -55.8 -56.2 64 -99 SPO 1997 10 18 16 46 40 3.8 -9 675.60 -57.0 -55.8 -56.2 65 -99 SPO 1997 10 18 16 47 41 3.8 -9 675.60 -57.0 -55.9 -56.2 65 -99 SPO 1997 10 18 16 48 40 3.8 -9 675.60 -57.2 -55.9 -56.3 67 -99 SPO 1997 10 18 16 49 39 3.9 -9 675.60 -57.1 -55.9 -56.3 66 -99 SPO 1997 10 18 16 50 38 3.9 -9 675.60 -57.0 -55.9 -56.2 64 -99 SPO 1997 10 18 16 51 37 4.0 -9 675.60 -57.0 -55.9 -56.2 64 -99 SPO 1997 10 18 16 52 38 4.3 -9 675.60 -56.9 -55.8 -56.1 63 -99 SPO 1997 10 18 16 53 37 4.4 -9 675.60 -56.9 -55.8 -56.1 63 -99 SPO 1997 10 18 16 54 36 4.4 -9 675.50 -56.9 -55.8 -56.2 63 -99 SPO 1997 10 18 16 55 34 4.6 -9 675.50 -56.9 -55.7 -56.2 63 -99 SPO 1997 10 18 16 56 33 4.8 -9 675.50 -56.9 -55.7 -56.2 64 -99 SPO 1997 10 18 16 57 31 4.9 -9 675.50 -56.8 -55.6 -56.2 64 -99 SPO 1997 10 18 16 58 29 4.9 -9 675.50 -56.7 -55.5 -56.1 64 -99 SPO 1997 10 18 16 59 28 5.1 -9 675.50 -56.6 -55.5 -56.0 64 -99 SPO 1997 10 18 17 00 27 5.2 -9 675.50 -56.6 -55.4 -56.0 65 0 SPO 1997 10 18 17 01 26 5.3 -9 675.60 -56.5 -55.4 -56.0 65 -99 SPO 1997 10 18 17 02 25 5.4 -9 675.60 -56.5 -55.4 -56.0 65 -99 SPO 1997 10 18 17 03 25 5.5 -9 675.60 -56.5 -55.5 -56.0 65 -99 SPO 1997 10 18 17 04 24 5.4 -9 675.60 -56.6 -55.5 -56.1 66 -99 SPO 1997 10 18 17 05 24 5.4 -9 675.60 -56.6 -55.5 -56.1 66 -99 SPO 1997 10 18 17 06 25 5.3 -9 675.60 -56.6 -55.4 -56.1 66 -99 SPO 1997 10 18 17 07 26 5.2 -9 675.60 -56.6 -55.4 -56.1 66 -99 SPO 1997 10 18 17 08 27 5.1 -9 675.60 -56.6 -55.4 -56.2 66 -99 SPO 1997 10 18 17 09 28 5.0 -9 675.60 -56.7 -55.5 -56.3 67 -99 SPO 1997 10 18 17 10 29 5.0 -9 675.60 -56.8 -55.5 -56.3 67 -99 SPO 1997 10 18 17 11 28 5.0 -9 675.60 -56.8 -55.5 -56.4 67 -99 SPO 1997 10 18 17 12 28 4.9 -9 675.60 -56.8 -55.5 -56.4 66 -99 SPO 1997 10 18 17 13 29 4.9 -9 675.70 -56.8 -55.6 -56.4 66 -99 SPO 1997 10 18 17 14 29 4.7 -9 675.70 -56.8 -55.5 -56.3 65 -99 SPO 1997 10 18 17 15 30 4.7 -9 675.70 -56.7 -55.5 -56.3 64 -99 SPO 1997 10 18 17 16 31 4.8 -9 675.70 -56.6 -55.5 -56.2 63 -99 SPO 1997 10 18 17 17 30 4.7 -9 675.70 -56.6 -55.5 -56.2 63 -99 SPO 1997 10 18 17 18 30 4.7 -9 675.70 -56.5 -55.5 -56.1 62 -99 SPO 1997 10 18 17 19 30 4.7 -9 675.70 -56.5 -55.6 -56.1 63 -99 SPO 1997 10 18 17 20 29 4.8 -9 675.70 -56.5 -55.7 -56.1 64 -99 SPO 1997 10 18 17 21 29 4.9 -9 675.70 -56.5 -55.7 -56.2 64 -99 SPO 1997 10 18 17 22 28 4.8 -9 675.70 -56.6 -55.7 -56.2 65 -99 SPO 1997 10 18 17 23 27 4.7 -9 675.70 -56.5 -55.8 -56.2 64 -99 SPO 1997 10 18 17 24 27 4.8 -9 675.70 -56.5 -55.8 -56.2 65 -99 SPO 1997 10 18 17 25 27 4.7 -9 675.70 -56.5 -55.9 -56.2 65 -99 SPO 1997 10 18 17 26 28 4.6 -9 675.70 -56.5 -55.9 -56.2 64 -99 SPO 1997 10 18 17 27 28 4.4 -9 675.70 -56.5 -55.9 -56.2 64 -99 SPO 1997 10 18 17 28 29 4.5 -9 675.70 -56.5 -55.8 -56.2 64 -99 SPO 1997 10 18 17 29 29 4.6 -9 675.70 -56.4 -55.8 -56.1 64 -99 SPO 1997 10 18 17 30 29 4.7 -9 675.70 -56.4 -55.8 -56.0 64 -99 SPO 1997 10 18 17 31 30 4.6 -9 675.70 -56.3 -55.8 -56.0 64 -99 SPO 1997 10 18 17 32 30 4.6 -9 675.70 -56.3 -55.8 -55.9 64 -99 SPO 1997 10 18 17 33 31 4.4 -9 675.70 -56.3 -55.7 -55.9 64 -99 SPO 1997 10 18 17 34 31 4.6 -9 675.70 -56.2 -55.8 -55.8 64 -99 SPO 1997 10 18 17 35 30 4.5 -9 675.70 -56.2 -55.9 -55.8 65 -99 SPO 1997 10 18 17 36 31 4.2 -9 675.70 -56.2 -55.9 -55.8 67 -99 SPO 1997 10 18 17 37 31 4.2 -9 675.70 -56.2 -55.9 -55.9 66 -99 SPO 1997 10 18 17 38 30 4.0 -9 675.70 -56.2 -55.9 -55.8 66 -99 SPO 1997 10 18 17 39 31 4.4 -9 675.70 -56.2 -55.8 -55.8 65 -99 SPO 1997 10 18 17 40 31 4.2 -9 675.70 -56.2 -55.8 -55.8 65 -99 SPO 1997 10 18 17 41 32 4.2 -9 675.70 -56.2 -55.8 -55.8 65 -99 SPO 1997 10 18 17 42 32 4.1 -9 675.70 -56.1 -55.8 -55.7 64 -99 SPO 1997 10 18 17 43 32 4.2 -9 675.70 -56.2 -55.8 -55.7 65 -99 SPO 1997 10 18 17 44 34 4.1 -9 675.70 -56.2 -55.8 -55.7 66 -99 SPO 1997 10 18 17 45 35 4.0 -9 675.70 -56.2 -55.8 -55.8 66 -99 SPO 1997 10 18 17 46 35 4.2 -9 675.70 -56.2 -55.8 -55.8 66 -99 SPO 1997 10 18 17 47 34 4.2 -9 675.70 -56.2 -55.8 -55.8 66 -99 SPO 1997 10 18 17 48 33 4.1 -9 675.70 -56.3 -55.8 -55.8 67 -99 SPO 1997 10 18 17 49 32 4.3 -9 675.70 -56.3 -55.9 -55.9 66 -99 SPO 1997 10 18 17 50 32 4.3 -9 675.70 -56.3 -55.8 -55.9 65 -99 SPO 1997 10 18 17 51 30 4.4 -9 675.70 -56.2 -55.9 -55.9 64 -99 SPO 1997 10 18 17 52 29 4.4 -9 675.70 -56.2 -55.9 -55.9 64 -99 SPO 1997 10 18 17 53 31 4.4 -9 675.70 -56.3 -55.8 -56.0 65 -99 SPO 1997 10 18 17 54 31 4.7 -9 675.70 -56.2 -55.8 -55.9 65 -99 SPO 1997 10 18 17 55 33 4.6 -9 675.70 -56.2 -55.8 -55.9 65 -99 SPO 1997 10 18 17 56 32 4.8 -9 675.70 -56.2 -55.8 -56.0 65 -99 SPO 1997 10 18 17 57 32 4.8 -9 675.70 -56.2 -55.7 -56.0 64 -99 SPO 1997 10 18 17 58 31 4.8 -9 675.70 -56.2 -55.6 -55.9 65 -99 SPO 1997 10 18 17 59 30 4.8 -9 675.70 -56.2 -55.6 -56.0 65 -99 SPO 1997 10 18 18 00 30 4.9 -9 675.70 -56.3 -55.6 -56.0 65 0 SPO 1997 10 18 18 01 30 4.8 -9 675.80 -56.3 -55.5 -56.0 65 -99 SPO 1997 10 18 18 02 31 4.8 -9 675.80 -56.3 -55.5 -56.0 65 -99 SPO 1997 10 18 18 03 31 4.7 -9 675.80 -56.3 -55.5 -56.0 64 -99 SPO 1997 10 18 18 04 31 4.7 -9 675.80 -56.2 -55.5 -56.0 64 -99 SPO 1997 10 18 18 05 32 4.5 -9 675.80 -56.2 -55.5 -55.9 63 -99 SPO 1997 10 18 18 06 32 4.6 -9 675.80 -56.1 -55.6 -55.8 63 -99 SPO 1997 10 18 18 07 31 4.6 -9 675.80 -56.0 -55.5 -55.8 63 -99 SPO 1997 10 18 18 08 31 4.5 -9 675.80 -56.0 -55.5 -55.7 64 -99 SPO 1997 10 18 18 09 31 4.5 -9 675.80 -56.0 -55.5 -55.7 64 -99 SPO 1997 10 18 18 10 30 4.6 -9 675.80 -56.0 -55.5 -55.6 65 -99 SPO 1997 10 18 18 11 31 4.5 -9 675.80 -56.0 -55.5 -55.6 65 -99 SPO 1997 10 18 18 12 31 4.4 -9 675.80 -56.0 -55.5 -55.6 65 -99 SPO 1997 10 18 18 13 30 4.4 -9 675.80 -55.9 -55.4 -55.6 65 -99 SPO 1997 10 18 18 14 29 4.3 -9 675.80 -55.9 -55.4 -55.6 65 -99 SPO 1997 10 18 18 15 31 4.4 -9 675.80 -55.9 -55.3 -55.5 65 -99 SPO 1997 10 18 18 16 31 4.5 -9 675.80 -55.9 -55.3 -55.5 65 -99 SPO 1997 10 18 18 17 31 4.3 -9 675.80 -55.9 -55.2 -55.4 65 -99 SPO 1997 10 18 18 18 32 4.3 -9 675.80 -55.9 -55.2 -55.4 65 -99 SPO 1997 10 18 18 19 34 4.2 -9 675.80 -55.9 -55.2 -55.4 66 -99 SPO 1997 10 18 18 20 34 4.2 -9 675.80 -55.8 -55.2 -55.4 65 -99 SPO 1997 10 18 18 21 34 4.2 -9 675.80 -55.8 -55.2 -55.3 65 -99 SPO 1997 10 18 18 22 34 4.3 -9 675.80 -55.8 -55.2 -55.4 65 -99 SPO 1997 10 18 18 23 33 4.4 -9 675.80 -55.9 -55.2 -55.4 67 -99 SPO 1997 10 18 18 24 32 4.6 -9 675.80 -55.9 -55.2 -55.4 66 -99 SPO 1997 10 18 18 25 32 4.6 -9 675.80 -56.0 -55.2 -55.5 67 -99 SPO 1997 10 18 18 26 31 4.8 -9 675.80 -56.0 -55.2 -55.5 66 -99 SPO 1997 10 18 18 27 30 4.8 -9 675.80 -56.0 -55.2 -55.5 66 -99 SPO 1997 10 18 18 28 30 4.8 -9 675.80 -56.0 -55.2 -55.5 66 -99 SPO 1997 10 18 18 29 30 4.8 -9 675.80 -55.9 -55.2 -55.6 65 -99 SPO 1997 10 18 18 30 30 4.8 -9 675.80 -56.0 -55.2 -55.6 66 -99 SPO 1997 10 18 18 31 30 4.8 -9 675.80 -56.0 -55.2 -55.6 66 -99 SPO 1997 10 18 18 32 31 4.7 -9 675.80 -56.0 -55.1 -55.6 65 -99 SPO 1997 10 18 18 33 31 4.7 -9 675.80 -56.0 -55.1 -55.6 65 -99 SPO 1997 10 18 18 34 32 4.5 -9 675.80 -56.0 -55.0 -55.6 65 -99 SPO 1997 10 18 18 35 33 4.5 -9 675.80 -56.0 -55.0 -55.6 65 -99 SPO 1997 10 18 18 36 36 4.2 -9 675.80 -56.0 -55.1 -55.5 65 -99 SPO 1997 10 18 18 37 37 4.2 -9 675.80 -56.0 -55.1 -55.5 65 -99 SPO 1997 10 18 18 38 39 4.0 -9 675.80 -56.1 -55.0 -55.5 65 -99 SPO 1997 10 18 18 39 43 4.1 -9 675.80 -56.1 -55.1 -55.6 65 -99 SPO 1997 10 18 18 40 45 4.0 -9 675.90 -56.1 -55.2 -55.6 66 -99 SPO 1997 10 18 18 41 46 3.9 -9 675.90 -56.1 -55.3 -55.6 66 -99 SPO 1997 10 18 18 42 47 3.7 -9 675.90 -56.2 -55.3 -55.6 67 -99 SPO 1997 10 18 18 43 46 3.8 -9 675.90 -56.3 -55.4 -55.7 68 -99 SPO 1997 10 18 18 44 45 3.7 -9 675.90 -56.2 -55.3 -55.7 67 -99 SPO 1997 10 18 18 45 42 3.7 -9 675.80 -56.2 -55.3 -55.6 67 -99 SPO 1997 10 18 18 46 44 3.8 -9 675.80 -56.1 -55.3 -55.6 66 -99 SPO 1997 10 18 18 47 46 3.8 -9 675.80 -56.2 -55.3 -55.6 68 -99 SPO 1997 10 18 18 48 45 3.8 -9 675.80 -56.2 -55.3 -55.6 68 -99 SPO 1997 10 18 18 49 45 3.8 -9 675.80 -56.2 -55.2 -55.5 68 -99 SPO 1997 10 18 18 50 44 3.9 -9 675.90 -56.1 -55.2 -55.4 66 -99 SPO 1997 10 18 18 51 45 3.8 -9 675.90 -56.1 -55.2 -55.4 66 -99 SPO 1997 10 18 18 52 43 3.7 -9 675.90 -56.1 -55.1 -55.4 67 -99 SPO 1997 10 18 18 53 45 3.9 -9 675.90 -56.0 -55.1 -55.3 66 -99 SPO 1997 10 18 18 54 46 3.8 -9 675.90 -56.0 -55.1 -55.3 66 -99 SPO 1997 10 18 18 55 46 3.8 -9 675.90 -56.0 -55.2 -55.2 67 -99 SPO 1997 10 18 18 56 43 3.9 -9 675.90 -56.0 -55.2 -55.3 67 -99 SPO 1997 10 18 18 57 41 4.1 -9 675.90 -55.9 -55.2 -55.3 67 -99 SPO 1997 10 18 18 58 41 4.3 -9 675.90 -55.9 -55.1 -55.3 67 -99 SPO 1997 10 18 18 59 39 4.3 -9 675.90 -56.0 -55.0 -55.3 69 -99 SPO 1997 10 18 19 00 37 4.4 -9 675.90 -56.0 -55.1 -55.3 68 0 SPO 1997 10 18 19 01 36 4.4 -9 675.90 -56.0 -55.1 -55.3 68 -99 SPO 1997 10 18 19 02 35 4.5 -9 675.90 -55.9 -55.0 -55.3 66 -99 SPO 1997 10 18 19 03 34 4.5 -9 675.90 -55.9 -54.8 -55.3 66 -99 SPO 1997 10 18 19 04 33 4.7 -9 675.90 -55.9 -54.8 -55.3 66 -99 SPO 1997 10 18 19 05 33 4.7 -9 675.90 -55.9 -54.8 -55.3 66 -99 SPO 1997 10 18 19 06 33 4.7 -9 675.90 -55.9 -54.8 -55.3 66 -99 SPO 1997 10 18 19 07 33 4.7 -9 675.90 -55.9 -54.9 -55.3 67 -99 SPO 1997 10 18 19 08 30 4.8 -9 675.90 -55.8 -54.9 -55.3 66 -99 SPO 1997 10 18 19 09 29 4.7 -9 675.90 -55.8 -54.9 -55.3 66 -99 SPO 1997 10 18 19 10 29 4.8 -9 675.90 -55.8 -54.9 -55.3 65 -99 SPO 1997 10 18 19 11 28 5.0 -9 675.90 -55.8 -55.0 -55.3 65 -99 SPO 1997 10 18 19 12 29 5.0 -9 675.90 -55.8 -55.0 -55.3 65 -99 SPO 1997 10 18 19 13 29 5.1 -9 675.90 -55.9 -55.0 -55.4 66 -99 SPO 1997 10 18 19 14 27 5.1 -9 675.90 -55.9 -55.1 -55.4 66 -99 SPO 1997 10 18 19 15 26 5.0 -9 675.90 -55.9 -55.1 -55.4 65 -99 SPO 1997 10 18 19 16 26 5.2 -9 675.90 -56.0 -55.0 -55.4 66 -99 SPO 1997 10 18 19 17 25 5.0 -9 675.90 -56.0 -55.0 -55.4 67 -99 SPO 1997 10 18 19 18 25 5.2 -9 675.90 -56.0 -54.9 -55.4 67 -99 SPO 1997 10 18 19 19 24 5.3 -9 675.90 -55.8 -54.9 -55.4 65 -99 SPO 1997 10 18 19 20 23 5.2 -9 675.90 -55.8 -54.9 -55.4 65 -99 SPO 1997 10 18 19 21 22 5.2 -9 675.90 -55.9 -54.9 -55.4 66 -99 SPO 1997 10 18 19 22 21 5.2 -9 675.90 -55.8 -54.9 -55.4 65 -99 SPO 1997 10 18 19 23 23 5.3 -9 675.90 -55.8 -54.9 -55.4 65 -99 SPO 1997 10 18 19 24 23 5.2 -9 675.80 -55.8 -54.8 -55.3 65 -99 SPO 1997 10 18 19 25 25 5.1 -9 675.80 -55.7 -54.9 -55.3 64 -99 SPO 1997 10 18 19 26 25 5.2 -9 675.80 -55.7 -55.0 -55.3 64 -99 SPO 1997 10 18 19 27 24 5.1 -9 675.80 -55.7 -55.0 -55.3 64 -99 SPO 1997 10 18 19 28 25 5.0 -9 675.80 -55.8 -55.1 -55.3 65 -99 SPO 1997 10 18 19 29 25 5.1 -9 675.80 -55.8 -55.1 -55.3 65 -99 SPO 1997 10 18 19 30 24 5.3 -9 675.80 -55.7 -55.1 -55.3 65 -99 SPO 1997 10 18 19 31 25 5.3 -9 675.80 -55.8 -55.1 -55.3 66 -99 SPO 1997 10 18 19 32 26 5.1 -9 675.80 -55.8 -55.0 -55.3 66 -99 SPO 1997 10 18 19 33 27 5.0 -9 675.90 -55.8 -55.0 -55.2 66 -99 SPO 1997 10 18 19 34 25 5.0 -9 675.90 -55.7 -55.0 -55.2 65 -99 SPO 1997 10 18 19 35 26 5.1 -9 675.90 -55.7 -55.0 -55.2 65 -99 SPO 1997 10 18 19 36 27 5.0 -9 675.90 -55.6 -55.0 -55.1 65 -99 SPO 1997 10 18 19 37 28 4.9 -9 675.90 -55.6 -55.1 -55.1 65 -99 SPO 1997 10 18 19 38 29 4.9 -9 675.90 -55.7 -55.1 -55.2 65 -99 SPO 1997 10 18 19 39 28 4.9 -9 675.90 -55.7 -55.2 -55.2 65 -99 SPO 1997 10 18 19 40 28 4.8 -9 675.90 -55.7 -55.2 -55.2 66 -99 SPO 1997 10 18 19 41 27 4.6 -9 675.90 -55.7 -55.2 -55.2 66 -99 SPO 1997 10 18 19 42 27 4.7 -9 676.00 -55.7 -55.2 -55.2 66 -99 SPO 1997 10 18 19 43 27 4.7 -9 676.00 -55.7 -55.2 -55.2 66 -99 SPO 1997 10 18 19 44 27 4.5 -9 676.00 -55.7 -55.2 -55.2 66 -99 SPO 1997 10 18 19 45 27 4.8 -9 676.00 -55.7 -55.3 -55.2 66 -99 SPO 1997 10 18 19 46 27 4.6 -9 676.00 -55.7 -55.3 -55.2 67 -99 SPO 1997 10 18 19 47 27 4.7 -9 676.00 -55.7 -55.3 -55.2 66 -99 SPO 1997 10 18 19 48 25 4.8 -9 676.00 -55.7 -55.3 -55.2 66 -99 SPO 1997 10 18 19 49 26 4.8 -9 676.00 -55.7 -55.3 -55.2 66 -99 SPO 1997 10 18 19 50 24 4.7 -9 676.00 -55.7 -55.3 -55.3 66 -99 SPO 1997 10 18 19 51 22 4.9 -9 676.00 -55.7 -55.2 -55.3 66 -99 SPO 1997 10 18 19 52 22 5.0 -9 676.00 -55.7 -55.2 -55.3 66 -99 SPO 1997 10 18 19 53 23 4.9 -9 676.00 -55.6 -55.2 -55.2 65 -99 SPO 1997 10 18 19 54 22 5.0 -9 676.00 -55.6 -55.2 -55.3 66 -99 SPO 1997 10 18 19 55 23 4.8 -9 676.00 -55.7 -55.2 -55.4 66 -99 SPO 1997 10 18 19 56 21 5.2 -9 676.00 -55.7 -55.2 -55.4 66 -99 SPO 1997 10 18 19 57 21 5.3 -9 676.00 -55.8 -55.2 -55.4 67 -99 SPO 1997 10 18 19 58 19 5.2 -9 676.00 -55.8 -55.1 -55.4 67 -99 SPO 1997 10 18 19 59 18 5.3 -9 676.00 -55.8 -55.1 -55.5 65 -99 SPO 1997 10 18 20 00 18 5.3 -9 676.00 -55.8 -55.2 -55.4 65 0 SPO 1997 10 18 20 01 17 5.4 -9 676.00 -55.8 -55.2 -55.4 65 -99 SPO 1997 10 18 20 02 16 5.4 -9 676.00 -55.7 -55.2 -55.4 64 -99 SPO 1997 10 18 20 03 16 5.6 -9 676.00 -55.7 -55.2 -55.4 65 -99 SPO 1997 10 18 20 04 16 5.6 -9 676.00 -55.8 -55.1 -55.5 66 -99 SPO 1997 10 18 20 05 15 5.6 -9 676.00 -55.7 -55.1 -55.4 65 -99 SPO 1997 10 18 20 06 15 5.8 -9 676.00 -55.7 -55.1 -55.4 66 -99 SPO 1997 10 18 20 07 15 5.6 -9 676.00 -55.7 -55.1 -55.4 67 -99 SPO 1997 10 18 20 08 14 5.8 -9 676.00 -55.7 -55.0 -55.4 68 -99 SPO 1997 10 18 20 09 14 6.0 -9 676.00 -55.6 -55.0 -55.4 67 -99 SPO 1997 10 18 20 10 14 5.9 -9 676.00 -55.6 -55.0 -55.4 67 -99 SPO 1997 10 18 20 11 14 5.8 -9 676.00 -55.7 -55.0 -55.4 68 -99 SPO 1997 10 18 20 12 13 5.9 -9 676.00 -55.6 -55.0 -55.4 66 -99 SPO 1997 10 18 20 13 13 6.0 -9 676.00 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 14 14 6.0 -9 676.00 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 15 14 5.9 -9 676.00 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 16 14 6.0 -9 676.00 -55.6 -55.0 -55.3 65 -99 SPO 1997 10 18 20 17 14 5.9 -9 676.00 -55.5 -55.0 -55.3 65 -99 SPO 1997 10 18 20 18 14 5.9 -9 676.00 -55.5 -55.2 -55.4 65 -99 SPO 1997 10 18 20 19 13 6.0 -9 676.00 -55.6 -55.2 -55.4 66 -99 SPO 1997 10 18 20 20 13 6.2 -9 676.00 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 21 12 6.0 -9 676.00 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 22 13 6.0 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 23 13 6.0 -9 675.90 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 24 14 6.0 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 25 14 6.1 -9 676.00 -55.5 -55.0 -55.4 65 -99 SPO 1997 10 18 20 26 13 6.1 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 27 12 6.2 -9 676.00 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 28 13 6.4 -9 675.90 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 29 13 6.4 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 30 12 6.4 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 31 11 6.3 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 32 11 6.5 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 33 12 6.3 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 34 11 6.3 -9 675.90 -55.6 -55.1 -55.4 66 -99 SPO 1997 10 18 20 35 12 6.2 -9 675.90 -55.6 -55.0 -55.4 66 -99 SPO 1997 10 18 20 36 13 6.1 -9 675.90 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 37 13 6.2 -9 676.00 -55.6 -55.0 -55.4 65 -99 SPO 1997 10 18 20 38 13 6.0 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 39 13 6.1 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 40 13 6.2 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 41 13 6.1 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 42 14 6.1 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 43 15 6.0 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 44 16 6.0 -9 676.00 -55.6 -55.1 -55.5 65 -99 SPO 1997 10 18 20 45 17 5.9 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 46 18 5.6 -9 676.00 -55.6 -55.1 -55.4 65 -99 SPO 1997 10 18 20 47 18 5.6 -9 676.00 -55.6 -55.1 -55.4 64 -99 SPO 1997 10 18 20 48 19 5.5 -9 676.00 -55.5 -55.2 -55.4 63 -99 SPO 1997 10 18 20 49 19 5.4 -9 676.00 -55.5 -55.2 -55.4 63 -99 SPO 1997 10 18 20 50 19 5.3 -9 676.00 -55.5 -55.2 -55.4 64 -99 SPO 1997 10 18 20 51 22 5.3 -9 676.00 -55.6 -55.2 -55.4 65 -99 SPO 1997 10 18 20 52 23 5.4 -9 676.10 -55.5 -55.3 -55.4 65 -99 SPO 1997 10 18 20 53 25 5.1 -9 676.10 -55.5 -55.3 -55.4 65 -99 SPO 1997 10 18 20 54 27 5.1 -9 676.10 -55.5 -55.3 -55.3 65 -99 SPO 1997 10 18 20 55 28 4.9 -9 676.10 -55.6 -55.3 -55.3 66 -99 SPO 1997 10 18 20 56 29 4.9 -9 676.10 -55.5 -55.3 -55.4 65 -99 SPO 1997 10 18 20 57 29 4.9 -9 676.10 -55.5 -55.3 -55.3 65 -99 SPO 1997 10 18 20 58 30 4.7 -9 676.10 -55.5 -55.3 -55.3 65 -99 SPO 1997 10 18 20 59 30 4.5 -9 676.10 -55.5 -55.4 -55.3 65 -99 SPO 1997 10 18 21 00 31 4.5 -9 676.10 -55.5 -55.3 -55.3 64 0 SPO 1997 10 18 21 01 31 4.6 -9 676.10 -55.5 -55.2 -55.2 64 -99 SPO 1997 10 18 21 02 33 4.4 -9 676.10 -55.5 -55.3 -55.2 63 -99 SPO 1997 10 18 21 03 33 4.5 -9 676.20 -55.5 -55.3 -55.2 63 -99 SPO 1997 10 18 21 04 31 4.5 -9 676.20 -55.5 -55.3 -55.2 65 -99 SPO 1997 10 18 21 05 33 4.3 -9 676.10 -55.4 -55.3 -55.2 64 -99 SPO 1997 10 18 21 06 32 4.5 -9 676.10 -55.5 -55.3 -55.2 65 -99 SPO 1997 10 18 21 07 33 4.7 -9 676.10 -55.4 -55.3 -55.2 65 -99 SPO 1997 10 18 21 08 33 4.8 -9 676.10 -55.4 -55.3 -55.2 65 -99 SPO 1997 10 18 21 09 33 4.9 -9 676.10 -55.4 -55.3 -55.2 65 -99 SPO 1997 10 18 21 10 34 5.0 -9 676.10 -55.5 -55.3 -55.2 66 -99 SPO 1997 10 18 21 11 34 5.0 -9 676.10 -55.4 -55.3 -55.2 65 -99 SPO 1997 10 18 21 12 34 4.9 -9 676.10 -55.4 -55.2 -55.2 65 -99 SPO 1997 10 18 21 13 32 5.0 -9 676.10 -55.5 -55.2 -55.2 65 -99 SPO 1997 10 18 21 14 30 5.1 -9 676.10 -55.4 -55.2 -55.2 65 -99 SPO 1997 10 18 21 15 30 5.0 -9 676.10 -55.4 -55.2 -55.2 65 -99 SPO 1997 10 18 21 16 29 5.0 -9 676.10 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 17 29 5.0 -9 676.10 -55.5 -55.1 -55.2 66 -99 SPO 1997 10 18 21 18 28 5.0 -9 676.10 -55.5 -55.1 -55.2 66 -99 SPO 1997 10 18 21 19 29 5.0 -9 676.10 -55.5 -55.1 -55.2 66 -99 SPO 1997 10 18 21 20 28 5.1 -9 676.10 -55.5 -55.1 -55.3 66 -99 SPO 1997 10 18 21 21 27 5.2 -9 676.10 -55.5 -55.1 -55.3 66 -99 SPO 1997 10 18 21 22 27 5.1 -9 676.10 -55.5 -55.1 -55.3 65 -99 SPO 1997 10 18 21 23 27 5.1 -9 676.10 -55.5 -55.1 -55.2 65 -99 SPO 1997 10 18 21 24 27 5.2 -9 676.10 -55.5 -55.1 -55.3 65 -99 SPO 1997 10 18 21 25 27 5.0 -9 676.20 -55.5 -55.1 -55.2 65 -99 SPO 1997 10 18 21 26 26 5.1 -9 676.20 -55.4 -55.0 -55.2 64 -99 SPO 1997 10 18 21 27 27 5.1 -9 676.20 -55.3 -55.0 -55.2 63 -99 SPO 1997 10 18 21 28 27 5.0 -9 676.20 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 29 27 5.0 -9 676.20 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 30 28 5.0 -9 676.20 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 31 28 4.9 -9 676.20 -55.4 -55.1 -55.2 66 -99 SPO 1997 10 18 21 32 29 5.1 -9 676.20 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 33 29 5.2 -9 676.20 -55.4 -55.1 -55.2 65 -99 SPO 1997 10 18 21 34 29 5.1 -9 676.20 -55.4 -55.2 -55.2 65 -99 SPO 1997 10 18 21 35 29 5.1 -9 676.20 -55.4 -55.2 -55.2 65 -99 SPO 1997 10 18 21 36 28 5.0 -9 676.20 -55.4 -55.2 -55.2 64 -99 SPO 1997 10 18 21 37 27 5.0 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 38 28 4.8 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 39 27 5.1 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 40 27 5.0 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 41 28 5.0 -9 676.20 -55.6 -55.2 -55.3 66 -99 SPO 1997 10 18 21 42 28 4.8 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 43 29 5.0 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 44 28 5.0 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 45 28 4.9 -9 676.20 -55.5 -55.2 -55.3 64 -99 SPO 1997 10 18 21 46 28 4.8 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 21 47 28 4.7 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 21 48 29 4.7 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 21 49 28 4.7 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 21 50 28 4.7 -9 676.20 -55.6 -55.2 -55.3 64 -99 SPO 1997 10 18 21 51 27 4.8 -9 676.20 -55.5 -55.2 -55.3 64 -99 SPO 1997 10 18 21 52 26 4.8 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 53 27 4.8 -9 676.20 -55.5 -55.2 -55.3 65 -99 SPO 1997 10 18 21 54 28 4.8 -9 676.20 -55.6 -55.2 -55.4 65 -99 SPO 1997 10 18 21 55 28 4.8 -9 676.20 -55.6 -55.3 -55.4 65 -99 SPO 1997 10 18 21 56 28 4.9 -9 676.20 -55.6 -55.3 -55.4 65 -99 SPO 1997 10 18 21 57 30 4.9 -9 676.20 -55.6 -55.3 -55.4 65 -99 SPO 1997 10 18 21 58 30 4.8 -9 676.20 -55.6 -55.2 -55.4 65 -99 SPO 1997 10 18 21 59 29 4.9 -9 676.20 -55.6 -55.2 -55.4 64 -99 SPO 1997 10 18 22 00 29 4.7 -9 676.20 -55.6 -55.2 -55.3 64 0 SPO 1997 10 18 22 01 28 4.7 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 22 02 28 4.8 -9 676.20 -55.5 -55.2 -55.3 63 -99 SPO 1997 10 18 22 03 28 5.0 -9 676.20 -55.4 -55.2 -55.2 62 -99 SPO 1997 10 18 22 04 28 4.7 -9 676.20 -55.5 -55.2 -55.2 64 -99 SPO 1997 10 18 22 05 28 4.8 -9 676.20 -55.5 -55.2 -55.2 65 -99 SPO 1997 10 18 22 06 29 4.9 -9 676.20 -55.4 -55.2 -55.2 64 -99 SPO 1997 10 18 22 07 28 4.7 -9 676.20 -55.5 -55.3 -55.2 65 -99 SPO 1997 10 18 22 08 28 4.4 -9 676.20 -55.5 -55.3 -55.2 65 -99 SPO 1997 10 18 22 09 28 4.5 -9 676.20 -55.6 -55.3 -55.2 65 -99 SPO 1997 10 18 22 10 25 4.9 -9 676.20 -55.5 -55.3 -55.2 64 -99 SPO 1997 10 18 22 11 23 4.9 -9 676.20 -55.5 -55.3 -55.2 64 -99 SPO 1997 10 18 22 12 22 5.0 -9 676.20 -55.6 -55.2 -55.2 65 -99 SPO 1997 10 18 22 13 20 5.1 -9 676.20 -55.5 -55.2 -55.2 64 -99 SPO 1997 10 18 22 14 18 5.3 -9 676.20 -55.5 -55.1 -55.2 65 -99 SPO 1997 10 18 22 15 16 5.6 -9 676.20 -55.5 -55.0 -55.2 65 -99 SPO 1997 10 18 22 16 15 5.7 -9 676.20 -55.5 -55.0 -55.2 65 -99 SPO 1997 10 18 22 17 15 5.9 -9 676.20 -55.4 -54.9 -55.2 65 -99 SPO 1997 10 18 22 18 14 6.0 -9 676.20 -55.4 -54.9 -55.2 65 -99 SPO 1997 10 18 22 19 14 6.1 -9 676.20 -55.4 -54.8 -55.2 64 -99 SPO 1997 10 18 22 20 14 6.2 -9 676.20 -55.5 -54.8 -55.2 64 -99 SPO 1997 10 18 22 21 14 6.2 -9 676.10 -55.5 -54.9 -55.2 64 -99 SPO 1997 10 18 22 22 13 6.3 -9 676.10 -55.5 -54.8 -55.3 64 -99 SPO 1997 10 18 22 23 13 6.5 -9 676.10 -55.6 -54.8 -55.3 65 -99 SPO 1997 10 18 22 24 14 6.2 -9 676.10 -55.6 -54.7 -55.3 65 -99 SPO 1997 10 18 22 25 14 6.5 -9 676.10 -55.6 -54.7 -55.3 65 -99 SPO 1997 10 18 22 26 13 6.6 -9 676.10 -55.6 -54.7 -55.3 65 -99 SPO 1997 10 18 22 27 12 6.5 -9 676.10 -55.6 -54.6 -55.3 65 -99 SPO 1997 10 18 22 28 12 6.5 -9 676.10 -55.5 -54.6 -55.3 65 -99 SPO 1997 10 18 22 29 13 6.5 -9 676.10 -55.6 -54.5 -55.4 65 -99 SPO 1997 10 18 22 30 12 6.6 -9 676.10 -55.6 -54.5 -55.4 65 -99 SPO 1997 10 18 22 31 13 6.5 -9 676.10 -55.6 -54.5 -55.4 65 -99 SPO 1997 10 18 22 32 12 6.6 -9 676.10 -55.5 -54.5 -55.4 64 -99 SPO 1997 10 18 22 33 12 6.7 -9 676.10 -55.6 -54.6 -55.4 64 -99 SPO 1997 10 18 22 34 12 6.6 -9 676.10 -55.5 -54.6 -55.4 63 -99 SPO 1997 10 18 22 35 11 6.7 -9 676.10 -55.5 -54.5 -55.4 63 -99 SPO 1997 10 18 22 36 11 6.8 -9 676.10 -55.5 -54.5 -55.4 64 -99 SPO 1997 10 18 22 37 11 6.7 -9 676.10 -55.5 -54.5 -55.4 64 -99 SPO 1997 10 18 22 38 12 6.7 -9 676.10 -55.6 -54.6 -55.4 65 -99 SPO 1997 10 18 22 39 12 6.7 -9 676.10 -55.6 -54.6 -55.4 65 -99 SPO 1997 10 18 22 40 12 6.9 -9 676.10 -55.6 -54.5 -55.4 65 -99 SPO 1997 10 18 22 41 12 6.7 -9 676.10 -55.6 -54.5 -55.4 65 -99 SPO 1997 10 18 22 42 12 6.7 -9 676.10 -55.6 -54.4 -55.4 65 -99 SPO 1997 10 18 22 43 12 6.8 -9 676.10 -55.5 -54.4 -55.4 64 -99 SPO 1997 10 18 22 44 12 6.8 -9 676.10 -55.5 -54.4 -55.3 64 -99 SPO 1997 10 18 22 45 12 6.8 -9 676.10 -55.5 -54.3 -55.3 63 -99 SPO 1997 10 18 22 46 12 6.9 -9 676.10 -55.5 -54.3 -55.3 63 -99 SPO 1997 10 18 22 47 12 7.0 -9 676.00 -55.4 -54.3 -55.3 62 -99 SPO 1997 10 18 22 48 12 7.1 -9 676.00 -55.4 -54.3 -55.3 63 -99 SPO 1997 10 18 22 49 11 7.1 -9 676.00 -55.4 -54.1 -55.3 64 -99 SPO 1997 10 18 22 50 12 7.3 -9 676.00 -55.4 -54.1 -55.3 64 -99 SPO 1997 10 18 22 51 11 7.2 -9 676.00 -55.4 -54.1 -55.3 64 -99 SPO 1997 10 18 22 52 11 7.2 -9 676.00 -55.4 -54.1 -55.3 65 -99 SPO 1997 10 18 22 53 10 7.3 -9 676.00 -55.4 -54.1 -55.4 65 -99 SPO 1997 10 18 22 54 10 7.5 -9 676.00 -55.4 -54.1 -55.4 65 -99 SPO 1997 10 18 22 55 10 7.4 -9 676.00 -55.4 -54.0 -55.3 65 -99 SPO 1997 10 18 22 56 11 7.6 -9 676.00 -55.4 -53.9 -55.3 64 -99 SPO 1997 10 18 22 57 10 7.4 -9 676.00 -55.3 -53.9 -55.3 63 -99 SPO 1997 10 18 22 58 10 7.4 -9 676.00 -55.3 -53.9 -55.3 64 -99 SPO 1997 10 18 22 59 10 7.4 -9 676.00 -55.4 -53.9 -55.3 65 -99 SPO 1997 10 18 23 00 10 7.4 -9 676.00 -55.3 -54.0 -55.3 65 0 SPO 1997 10 18 23 01 9 7.2 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 02 9 7.3 -9 676.00 -55.3 -54.1 -55.2 65 -99 SPO 1997 10 18 23 03 10 7.4 -9 676.00 -55.3 -54.1 -55.2 65 -99 SPO 1997 10 18 23 04 9 7.6 -9 676.00 -55.3 -54.1 -55.2 66 -99 SPO 1997 10 18 23 05 9 7.7 -9 676.00 -55.3 -54.0 -55.2 66 -99 SPO 1997 10 18 23 06 9 7.6 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 07 8 7.9 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 08 8 7.9 -9 676.00 -55.3 -53.9 -55.2 65 -99 SPO 1997 10 18 23 09 8 7.8 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 10 8 7.9 -9 676.00 -55.4 -54.0 -55.2 65 -99 SPO 1997 10 18 23 11 8 7.9 -9 676.00 -55.4 -53.9 -55.2 65 -99 SPO 1997 10 18 23 12 8 7.9 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 13 8 7.9 -9 676.00 -55.3 -54.0 -55.2 65 -99 SPO 1997 10 18 23 14 8 7.8 -9 676.00 -55.3 -54.0 -55.3 65 -99 SPO 1997 10 18 23 15 8 7.7 -9 676.00 -55.3 -54.1 -55.3 65 -99 SPO 1997 10 18 23 16 8 7.8 -9 676.00 -55.3 -54.0 -55.3 65 -99 SPO 1997 10 18 23 17 7 7.6 -9 676.00 -55.3 -54.0 -55.3 65 -99 SPO 1997 10 18 23 18 7 7.7 -9 676.00 -55.3 -54.0 -55.3 65 -99 SPO 1997 10 18 23 19 7 7.6 -9 676.10 -55.4 -54.0 -55.3 65 -99 SPO 1997 10 18 23 20 7 7.7 -9 676.00 -55.4 -54.0 -55.3 65 -99 SPO 1997 10 18 23 21 7 7.8 -9 676.00 -55.4 -54.1 -55.3 65 -99 SPO 1997 10 18 23 22 6 7.9 -9 676.00 -55.4 -54.1 -55.3 65 -99 SPO 1997 10 18 23 23 6 7.8 -9 676.00 -55.4 -54.2 -55.3 65 -99 SPO 1997 10 18 23 24 6 7.8 -9 676.00 -55.4 -54.2 -55.3 65 -99 SPO 1997 10 18 23 25 6 7.9 -9 676.00 -55.4 -54.2 -55.3 65 -99 SPO 1997 10 18 23 26 7 8.0 -9 676.00 -55.4 -54.3 -55.3 65 -99 SPO 1997 10 18 23 27 7 7.7 -9 676.00 -55.4 -54.3 -55.3 65 -99 SPO 1997 10 18 23 28 6 7.8 -9 676.00 -55.5 -54.3 -55.3 66 -99 SPO 1997 10 18 23 29 6 7.8 -9 676.00 -55.4 -54.2 -55.3 65 -99 SPO 1997 10 18 23 30 6 7.9 -9 676.00 -55.4 -54.2 -55.4 65 -99 SPO 1997 10 18 23 31 7 7.8 -9 676.10 -55.4 -54.1 -55.4 65 -99 SPO 1997 10 18 23 32 6 7.6 -9 676.10 -55.4 -54.2 -55.4 64 -99 SPO 1997 10 18 23 33 6 7.3 -9 676.10 -55.4 -54.2 -55.4 64 -99 SPO 1997 10 18 23 34 7 7.2 -9 676.10 -55.4 -54.3 -55.4 64 -99 SPO 1997 10 18 23 35 7 7.0 -9 676.10 -55.4 -54.4 -55.3 63 -99 SPO 1997 10 18 23 36 8 6.9 -9 676.10 -55.4 -54.4 -55.3 64 -99 SPO 1997 10 18 23 37 8 6.8 -9 676.20 -55.4 -54.4 -55.2 64 -99 SPO 1997 10 18 23 38 10 6.7 -9 676.20 -55.4 -54.4 -55.2 65 -99 SPO 1997 10 18 23 39 10 6.4 -9 676.20 -55.4 -54.5 -55.2 65 -99 SPO 1997 10 18 23 40 11 6.5 -9 676.20 -55.4 -54.5 -55.2 65 -99 SPO 1997 10 18 23 41 12 6.3 -9 676.20 -55.4 -54.5 -55.1 65 -99 SPO 1997 10 18 23 42 14 5.7 -9 676.20 -55.4 -54.6 -55.1 65 -99 SPO 1997 10 18 23 43 17 5.8 -9 676.20 -55.4 -54.6 -55.1 64 -99 SPO 1997 10 18 23 44 20 5.2 -9 676.20 -55.5 -54.7 -55.1 65 -99 SPO 1997 10 18 23 45 23 4.8 -9 676.20 -55.4 -54.8 -55.1 64 -99 SPO 1997 10 18 23 46 25 4.7 -9 676.20 -55.4 -54.9 -55.0 64 -99 SPO 1997 10 18 23 47 29 4.3 -9 676.20 -55.5 -55.0 -55.0 65 -99 SPO 1997 10 18 23 48 32 4.0 -9 676.20 -55.4 -55.0 -54.9 65 -99 SPO 1997 10 18 23 49 36 3.6 -9 676.20 -55.4 -55.0 -54.9 65 -99 SPO 1997 10 18 23 50 39 3.4 -9 676.20 -55.5 -55.0 -54.9 66 -99 SPO 1997 10 18 23 51 39 3.7 -9 676.20 -55.5 -55.1 -54.9 66 -99 SPO 1997 10 18 23 52 39 3.6 -9 676.20 -55.4 -55.1 -54.8 65 -99 SPO 1997 10 18 23 53 38 3.6 -9 676.20 -55.5 -55.1 -54.8 66 -99 SPO 1997 10 18 23 54 38 3.6 -9 676.20 -55.4 -55.1 -54.8 65 -99 SPO 1997 10 18 23 55 37 3.6 -9 676.20 -55.5 -55.1 -54.8 66 -99 SPO 1997 10 18 23 56 38 3.5 -9 676.20 -55.5 -55.1 -54.8 65 -99 SPO 1997 10 18 23 57 36 3.4 -9 676.20 -55.5 -55.1 -54.8 65 -99 SPO 1997 10 18 23 58 34 3.6 -9 676.20 -55.5 -55.1 -54.7 -99 -99 SPO 1997 10 18 23 59 32 3.8 -9 676.20 -55.5 -55.1 -54.8 -99 -99 SPO 1997 10 19 00 00 -999 -99.9 -9 676.30 -55.4 -55.0 -54.7 -99 0 SPO 1997 10 19 00 01 -999 -99.9 -9 676.30 -55.4 -55.0 -54.7 -99 -99 SPO 1997 10 19 00 02 -999 -99.9 -9 676.20 -55.4 -55.0 -54.7 -99 -99 SPO 1997 10 19 00 03 -999 -99.9 -9 676.20 -55.4 -54.9 -54.8 65 -99 SPO 1997 10 19 00 04 -999 -99.9 -9 676.20 -55.4 -54.9 -54.8 65 -99 SPO 1997 10 19 00 05 -999 -99.9 -9 676.10 -55.4 -54.8 -54.8 66 -99 SPO 1997 10 19 00 06 -999 -99.9 -9 676.10 -55.4 -54.8 -54.8 66 -99 SPO 1997 10 19 00 07 -999 -99.9 -9 676.10 -55.4 -54.7 -54.9 65 -99 SPO 1997 10 19 00 08 -999 -99.9 -9 676.10 -55.3 -54.7 -54.9 65 -99 SPO 1997 10 19 00 09 -999 -99.9 -9 676.10 -55.3 -54.6 -54.9 65 -99 SPO 1997 10 19 00 10 -999 -99.9 -9 676.00 -55.3 -54.5 -54.9 65 -99 SPO 1997 10 19 00 11 -999 -99.9 -9 676.00 -55.3 -54.5 -54.9 65 -99 SPO 1997 10 19 00 12 -999 -99.9 -9 676.00 -55.3 -54.4 -54.9 66 -99 SPO 1997 10 19 00 13 -999 -99.9 -9 676.00 -55.3 -54.3 -55.0 66 -99 SPO 1997 10 19 00 14 -999 -99.9 -9 676.00 -55.3 -54.2 -55.0 66 -99 SPO 1997 10 19 00 15 -999 -99.9 -9 676.00 -55.3 -54.2 -55.0 67 -99 SPO 1997 10 19 00 16 -999 -99.9 -9 676.00 -55.3 -54.0 -55.0 67 -99 SPO 1997 10 19 00 17 -999 -99.9 -9 675.90 -55.3 -53.9 -55.0 66 -99 SPO 1997 10 19 00 18 -999 -99.9 -9 675.90 -55.2 -54.0 -55.0 66 -99 SPO 1997 10 19 00 19 -999 -99.9 -9 675.90 -55.2 -53.9 -55.0 65 -99 SPO 1997 10 19 00 20 -999 -99.9 -9 675.90 -55.2 -53.9 -55.0 65 -99 SPO 1997 10 19 00 21 -999 -99.9 -9 675.90 -55.1 -53.9 -55.0 64 -99 SPO 1997 10 19 00 22 -999 -99.9 -9 675.90 -55.1 -53.8 -55.0 63 -99 SPO 1997 10 19 00 23 -999 -99.9 -9 675.90 -55.1 -53.8 -55.0 64 -99 SPO 1997 10 19 00 24 -999 -99.9 -9 676.00 -55.0 -53.9 -55.0 64 -99 SPO 1997 10 19 00 25 -999 -99.9 -9 676.00 -55.1 -53.9 -55.0 65 -99 SPO 1997 10 19 00 26 -999 -99.9 -9 676.00 -55.1 -53.9 -55.0 66 -99 SPO 1997 10 19 00 27 -999 -99.9 -9 675.90 -55.0 -53.9 -54.9 65 -99 SPO 1997 10 19 00 28 -999 -99.9 -9 675.90 -55.0 -53.9 -54.9 66 -99 SPO 1997 10 19 00 29 -999 -99.9 -9 675.90 -55.0 -53.9 -54.8 66 -99 SPO 1997 10 19 00 30 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 66 -99 SPO 1997 10 19 00 31 -999 -99.9 -9 675.90 -54.9 -53.9 -54.8 65 -99 SPO 1997 10 19 00 32 -999 -99.9 -9 676.00 -54.9 -53.9 -54.8 64 -99 SPO 1997 10 19 00 33 -999 -99.9 -9 676.00 -54.9 -53.9 -54.8 64 -99 SPO 1997 10 19 00 34 -999 -99.9 -9 675.90 -54.9 -53.9 -54.7 64 -99 SPO 1997 10 19 00 35 -999 -99.9 -9 675.90 -54.9 -53.9 -54.8 65 -99 SPO 1997 10 19 00 36 -999 -99.9 -9 675.90 -54.9 -53.9 -54.9 65 -99 SPO 1997 10 19 00 37 -999 -99.9 -9 675.90 -54.9 -53.9 -54.8 66 -99 SPO 1997 10 19 00 38 -999 -99.9 -9 675.90 -54.8 -54.0 -54.8 65 -99 SPO 1997 10 19 00 39 -999 -99.9 -9 675.90 -54.8 -54.0 -54.8 65 -99 SPO 1997 10 19 00 40 -999 -99.9 -9 675.90 -54.8 -54.0 -54.8 65 -99 SPO 1997 10 19 00 41 -999 -99.9 -9 675.90 -54.9 -54.1 -54.8 66 -99 SPO 1997 10 19 00 42 -999 -99.9 -9 675.90 -54.9 -54.0 -54.9 66 -99 SPO 1997 10 19 00 43 -999 -99.9 -9 675.90 -54.9 -54.0 -54.9 65 -99 SPO 1997 10 19 00 44 -999 -99.9 -9 675.90 -54.9 -54.0 -54.8 65 -99 SPO 1997 10 19 00 45 -999 -99.9 -9 675.90 -54.8 -53.9 -54.8 64 -99 SPO 1997 10 19 00 46 -999 -99.9 -9 676.00 -55.0 -54.2 -54.8 66 -99 SPO 1997 10 19 00 47 -999 -99.9 -9 675.90 -54.9 -54.1 -54.8 66 -99 SPO 1997 10 19 00 48 -999 -99.9 -9 675.90 -54.9 -54.0 -54.8 66 -99 SPO 1997 10 19 00 49 -999 -99.9 -9 675.90 -54.9 -54.0 -54.8 66 -99 SPO 1997 10 19 00 50 -999 -99.9 -9 675.90 -54.9 -53.9 -54.8 66 -99 SPO 1997 10 19 00 51 -999 -99.9 -9 675.90 -54.9 -53.8 -54.7 66 -99 SPO 1997 10 19 00 52 -999 -99.9 -9 675.90 -54.8 -53.8 -54.7 66 -99 SPO 1997 10 19 00 53 -999 -99.9 -9 675.90 -54.8 -54.0 -54.7 66 -99 SPO 1997 10 19 00 54 -999 -99.9 -9 675.90 -54.8 -53.6 -54.7 66 -99 SPO 1997 10 19 00 55 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 65 -99 SPO 1997 10 19 00 56 -999 -99.9 -9 676.00 -54.9 -54.1 -54.7 65 -99 SPO 1997 10 19 00 57 -999 -99.9 -9 676.00 -54.9 -54.2 -54.8 65 -99 SPO 1997 10 19 00 58 -999 -99.9 -9 676.00 -55.0 -54.2 -54.7 66 -99 SPO 1997 10 19 00 59 -999 -99.9 -9 676.00 -55.0 -54.3 -54.8 66 -99 SPO 1997 10 19 01 00 -999 -99.9 -9 676.00 -55.0 -54.2 -54.8 66 0 SPO 1997 10 19 01 01 -999 -99.9 -9 676.00 -55.0 -54.4 -54.8 66 -99 SPO 1997 10 19 01 02 -999 -99.9 -9 676.00 -55.0 -54.2 -54.8 66 -99 SPO 1997 10 19 01 03 -999 -99.9 -9 676.00 -55.0 -54.1 -54.8 66 -99 SPO 1997 10 19 01 04 -999 -99.9 -9 676.00 -55.0 -54.1 -54.8 66 -99 SPO 1997 10 19 01 05 -999 -99.9 -9 676.00 -55.0 -54.1 -54.8 66 -99 SPO 1997 10 19 01 06 -999 -99.9 -9 675.90 -55.1 -54.0 -54.8 66 -99 SPO 1997 10 19 01 07 -999 -99.9 -9 676.00 -55.0 -54.1 -54.8 66 -99 SPO 1997 10 19 01 08 -999 -99.9 -9 676.00 -55.0 -54.0 -54.8 65 -99 SPO 1997 10 19 01 09 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 64 -99 SPO 1997 10 19 01 10 -999 -99.9 -9 676.00 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 19 01 11 -999 -99.9 -9 676.00 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 19 01 12 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 64 -99 SPO 1997 10 19 01 13 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 65 -99 SPO 1997 10 19 01 14 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 65 -99 SPO 1997 10 19 01 15 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 66 -99 SPO 1997 10 19 01 16 -999 -99.9 -9 676.00 -55.1 -53.9 -54.9 66 -99 SPO 1997 10 19 01 17 -999 -99.9 -9 676.00 -55.1 -53.9 -54.8 66 -99 SPO 1997 10 19 01 18 -999 -99.9 -9 676.00 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 19 01 19 -999 -99.9 -9 676.00 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 19 01 20 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 64 -99 SPO 1997 10 19 01 21 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 64 -99 SPO 1997 10 19 01 22 -999 -99.9 -9 676.00 -55.0 -53.8 -54.8 64 -99 SPO 1997 10 19 01 23 -999 -99.9 -9 676.00 -55.0 -53.9 -54.8 64 -99 SPO 1997 10 19 01 24 -999 -99.9 -9 676.00 -55.0 -53.8 -54.9 65 -99 SPO 1997 10 19 01 25 -999 -99.9 -9 676.00 -55.0 -53.8 -54.9 65 -99 SPO 1997 10 19 01 26 -999 -99.9 -9 676.00 -55.0 -53.8 -54.9 65 -99 SPO 1997 10 19 01 27 -999 -99.9 -9 676.00 -55.1 -53.8 -54.9 66 -99 SPO 1997 10 19 01 28 -999 -99.9 -9 676.00 -55.1 -53.9 -54.9 66 -99 SPO 1997 10 19 01 29 -999 -99.9 -9 676.00 -55.1 -53.9 -54.9 65 -99 SPO 1997 10 19 01 30 -999 -99.9 -9 676.00 -55.1 -54.0 -54.9 64 -99 SPO 1997 10 19 01 31 -999 -99.9 -9 676.00 -55.1 -54.0 -55.0 63 -99 SPO 1997 10 19 01 32 -999 -99.9 -9 676.00 -55.2 -54.0 -55.0 64 -99 SPO 1997 10 19 01 33 -999 -99.9 -9 676.00 -55.2 -54.0 -55.0 64 -99 SPO 1997 10 19 01 34 -999 -99.9 -9 676.00 -55.2 -53.9 -55.0 64 -99 SPO 1997 10 19 01 35 -999 -99.9 -9 676.00 -55.2 -53.9 -54.9 64 -99 SPO 1997 10 19 01 36 -999 -99.9 -9 676.10 -55.2 -53.8 -54.9 64 -99 SPO 1997 10 19 01 37 -999 -99.9 -9 676.10 -55.2 -53.8 -55.0 65 -99 SPO 1997 10 19 01 38 -999 -99.9 -9 676.10 -55.2 -53.8 -55.0 65 -99 SPO 1997 10 19 01 39 -999 -99.9 -9 676.10 -55.2 -53.8 -55.0 65 -99 SPO 1997 10 19 01 40 -999 -99.9 -9 676.10 -55.2 -53.8 -55.0 65 -99 SPO 1997 10 19 01 41 -999 -99.9 -9 676.10 -55.2 -53.8 -55.0 65 -99 SPO 1997 10 19 01 42 -999 -99.9 -9 676.10 -55.2 -53.8 -54.9 65 -99 SPO 1997 10 19 01 43 -999 -99.9 -9 676.10 -55.2 -53.9 -54.9 65 -99 SPO 1997 10 19 01 44 -999 -99.9 -9 676.10 -55.2 -54.0 -54.9 65 -99 SPO 1997 10 19 01 45 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 65 -99 SPO 1997 10 19 01 46 -999 -99.9 -9 676.00 -55.3 -54.1 -55.0 65 -99 SPO 1997 10 19 01 47 -999 -99.9 -9 676.10 -55.3 -54.1 -55.0 65 -99 SPO 1997 10 19 01 48 -999 -99.9 -9 676.10 -55.3 -54.1 -55.0 66 -99 SPO 1997 10 19 01 49 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 66 -99 SPO 1997 10 19 01 50 -999 -99.9 -9 676.10 -55.4 -53.9 -55.0 67 -99 SPO 1997 10 19 01 51 -999 -99.9 -9 676.10 -55.4 -53.9 -55.0 67 -99 SPO 1997 10 19 01 52 -999 -99.9 -9 676.10 -55.3 -53.9 -55.0 66 -99 SPO 1997 10 19 01 53 -999 -99.9 -9 676.10 -55.3 -53.9 -55.0 65 -99 SPO 1997 10 19 01 54 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 65 -99 SPO 1997 10 19 01 55 -999 -99.9 -9 676.10 -55.4 -54.0 -55.0 65 -99 SPO 1997 10 19 01 56 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 64 -99 SPO 1997 10 19 01 57 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 63 -99 SPO 1997 10 19 01 58 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 64 -99 SPO 1997 10 19 01 59 -999 -99.9 -9 676.10 -55.3 -54.0 -55.0 65 -99 SPO 1997 10 19 02 00 -999 -99.9 -9 676.10 -55.3 -54.1 -55.0 65 0 SPO 1997 10 19 02 01 -999 -99.9 -9 676.10 -55.3 -54.2 -55.0 65 -99 SPO 1997 10 19 02 02 -999 -99.9 -9 676.10 -55.3 -54.2 -55.0 65 -99 SPO 1997 10 19 02 03 -999 -99.9 -9 676.10 -55.3 -54.3 -54.9 65 -99 SPO 1997 10 19 02 04 -999 -99.9 -9 676.20 -55.3 -54.4 -54.9 65 -99 SPO 1997 10 19 02 05 -999 -99.9 -9 676.20 -55.3 -54.4 -54.9 65 -99 SPO 1997 10 19 02 06 -999 -99.9 -9 676.20 -55.2 -54.4 -54.8 65 -99 SPO 1997 10 19 02 07 -999 -99.9 -9 676.20 -55.2 -54.5 -54.8 65 -99 SPO 1997 10 19 02 08 -999 -99.9 -9 676.20 -55.2 -54.5 -54.8 65 -99 SPO 1997 10 19 02 09 -999 -99.9 -9 676.20 -55.2 -54.5 -54.8 65 -99 SPO 1997 10 19 02 10 -999 -99.9 -9 676.20 -55.2 -54.6 -54.7 65 -99 SPO 1997 10 19 02 11 -999 -99.9 -9 676.20 -55.2 -54.6 -54.7 66 -99 SPO 1997 10 19 02 12 -999 -99.9 -9 676.20 -55.2 -54.6 -54.7 66 -99 SPO 1997 10 19 02 13 -999 -99.9 -9 676.20 -55.2 -54.6 -54.7 66 -99 SPO 1997 10 19 02 14 -999 -99.9 -9 676.20 -55.1 -54.6 -54.6 65 -99 SPO 1997 10 19 02 15 -999 -99.9 -9 676.20 -55.2 -54.6 -54.6 66 -99 SPO 1997 10 19 02 16 -999 -99.9 -9 676.20 -55.2 -54.6 -54.6 66 -99 SPO 1997 10 19 02 17 -999 -99.9 -9 676.20 -55.1 -54.6 -54.5 66 -99 SPO 1997 10 19 02 18 -999 -99.9 -9 676.20 -55.1 -54.6 -54.5 66 -99 SPO 1997 10 19 02 19 -999 -99.9 -9 676.20 -55.1 -54.5 -54.5 65 -99 SPO 1997 10 19 02 20 -999 -99.9 -9 676.20 -55.1 -54.5 -54.5 65 -99 SPO 1997 10 19 02 21 -999 -99.9 -9 676.20 -55.1 -54.5 -54.5 65 -99 SPO 1997 10 19 02 22 -999 -99.9 -9 676.20 -55.1 -54.4 -54.4 66 -99 SPO 1997 10 19 02 23 -999 -99.9 -9 676.20 -55.1 -54.4 -54.4 66 -99 SPO 1997 10 19 02 24 -999 -99.9 -9 676.20 -55.0 -54.4 -54.5 66 -99 SPO 1997 10 19 02 25 -999 -99.9 -9 676.20 -55.1 -54.4 -54.5 66 -99 SPO 1997 10 19 02 26 -999 -99.9 -9 676.20 -55.1 -54.3 -54.5 67 -99 SPO 1997 10 19 02 27 -999 -99.9 -9 676.20 -55.1 -54.3 -54.6 67 -99 SPO 1997 10 19 02 28 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 66 -99 SPO 1997 10 19 02 29 -999 -99.9 -9 676.20 -55.1 -54.3 -54.6 66 -99 SPO 1997 10 19 02 30 -999 -99.9 -9 676.20 -55.0 -54.2 -54.6 66 -99 SPO 1997 10 19 02 31 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 66 -99 SPO 1997 10 19 02 32 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 66 -99 SPO 1997 10 19 02 33 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 65 -99 SPO 1997 10 19 02 34 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 65 -99 SPO 1997 10 19 02 35 -999 -99.9 -9 676.20 -55.1 -54.1 -54.6 66 -99 SPO 1997 10 19 02 36 -999 -99.9 -9 676.20 -55.1 -54.0 -54.6 66 -99 SPO 1997 10 19 02 37 -999 -99.9 -9 676.20 -55.1 -54.0 -54.6 66 -99 SPO 1997 10 19 02 38 -999 -99.9 -9 676.20 -55.1 -54.0 -54.6 66 -99 SPO 1997 10 19 02 39 -999 -99.9 -9 676.20 -55.0 -53.9 -54.6 66 -99 SPO 1997 10 19 02 40 -999 -99.9 -9 676.20 -55.1 -54.0 -54.6 66 -99 SPO 1997 10 19 02 41 -999 -99.9 -9 676.20 -55.1 -54.0 -54.7 66 -99 SPO 1997 10 19 02 42 -999 -99.9 -9 676.20 -55.1 -54.0 -54.7 66 -99 SPO 1997 10 19 02 43 -999 -99.9 -9 676.20 -55.0 -54.0 -54.6 65 -99 SPO 1997 10 19 02 44 -999 -99.9 -9 676.20 -55.0 -54.1 -54.6 64 -99 SPO 1997 10 19 02 45 -999 -99.9 -9 676.20 -55.0 -54.1 -54.6 64 -99 SPO 1997 10 19 02 46 -999 -99.9 -9 676.20 -55.0 -54.2 -54.6 65 -99 SPO 1997 10 19 02 47 -999 -99.9 -9 676.20 -55.1 -54.2 -54.6 66 -99 SPO 1997 10 19 02 48 -999 -99.9 -9 676.20 -55.1 -54.2 -54.7 66 -99 SPO 1997 10 19 02 49 -999 -99.9 -9 676.20 -55.1 -54.1 -54.7 66 -99 SPO 1997 10 19 02 50 -999 -99.9 -9 676.20 -55.2 -54.2 -54.7 67 -99 SPO 1997 10 19 02 51 -999 -99.9 -9 676.20 -55.1 -54.1 -54.7 66 -99 SPO 1997 10 19 02 52 -999 -99.9 -9 676.10 -55.1 -54.1 -54.7 66 -99 SPO 1997 10 19 02 53 -999 -99.9 -9 676.10 -55.1 -54.1 -54.7 66 -99 SPO 1997 10 19 02 54 -999 -99.9 -9 676.10 -55.1 -54.2 -54.7 65 -99 SPO 1997 10 19 02 55 -999 -99.9 -9 676.10 -55.1 -54.2 -54.8 65 -99 SPO 1997 10 19 02 56 -999 -99.9 -9 676.10 -55.2 -54.2 -54.8 65 -99 SPO 1997 10 19 02 57 -999 -99.9 -9 676.10 -55.2 -54.3 -54.9 64 -99 SPO 1997 10 19 02 58 -999 -99.9 -9 676.10 -55.3 -54.4 -55.0 65 -99 SPO 1997 10 19 02 59 -999 -99.9 -9 676.20 -55.3 -54.4 -55.0 64 -99 SPO 1997 10 19 03 00 -999 -99.9 -9 676.20 -55.3 -54.5 -55.0 64 0 SPO 1997 10 19 03 01 -999 -99.9 -9 676.20 -55.4 -54.5 -55.0 65 -99 SPO 1997 10 19 03 02 -999 -99.9 -9 676.20 -55.4 -54.5 -55.0 65 -99 SPO 1997 10 19 03 03 -999 -99.9 -9 676.20 -55.5 -54.5 -55.0 66 -99 SPO 1997 10 19 03 04 -999 -99.9 -9 676.20 -55.5 -54.5 -55.0 66 -99 SPO 1997 10 19 03 05 -999 -99.9 -9 676.20 -55.4 -54.5 -55.0 65 -99 SPO 1997 10 19 03 06 -999 -99.9 -9 676.20 -55.4 -54.5 -55.0 64 -99 SPO 1997 10 19 03 07 -999 -99.9 -9 676.20 -55.5 -54.6 -55.0 65 -99 SPO 1997 10 19 03 08 -999 -99.9 -9 676.20 -55.5 -54.6 -54.9 64 -99 SPO 1997 10 19 03 09 -999 -99.9 -9 676.20 -55.5 -54.6 -54.9 64 -99 SPO 1997 10 19 03 10 -999 -99.9 -9 676.20 -55.5 -54.6 -54.9 65 -99 SPO 1997 10 19 03 11 -999 -99.9 -9 676.20 -55.4 -54.4 -54.8 64 -99 SPO 1997 10 19 03 12 -999 -99.9 -9 676.20 -55.4 -54.4 -54.8 65 -99 SPO 1997 10 19 03 13 -999 -99.9 -9 676.20 -55.4 -54.4 -54.7 65 -99 SPO 1997 10 19 03 14 -999 -99.9 -9 676.20 -55.3 -54.4 -54.7 64 -99 SPO 1997 10 19 03 15 -999 -99.9 -9 676.20 -55.3 -54.4 -54.7 65 -99 SPO 1997 10 19 03 16 -999 -99.9 -9 676.20 -55.3 -54.5 -54.7 65 -99 SPO 1997 10 19 03 17 -999 -99.9 -9 676.20 -55.3 -54.6 -54.7 65 -99 SPO 1997 10 19 03 18 -999 -99.9 -9 676.20 -55.3 -54.6 -54.6 65 -99 SPO 1997 10 19 03 19 -999 -99.9 -9 676.20 -55.3 -54.6 -54.6 65 -99 SPO 1997 10 19 03 20 -999 -99.9 -9 676.20 -55.3 -54.5 -54.6 65 -99 SPO 1997 10 19 03 21 -999 -99.9 -9 676.20 -55.3 -54.5 -54.6 65 -99 SPO 1997 10 19 03 22 -999 -99.9 -9 676.20 -55.3 -54.4 -54.6 65 -99 SPO 1997 10 19 03 23 -999 -99.9 -9 676.20 -55.3 -54.4 -54.6 66 -99 SPO 1997 10 19 03 24 -999 -99.9 -9 676.20 -55.2 -54.4 -54.6 66 -99 SPO 1997 10 19 03 25 -999 -99.9 -9 676.10 -55.2 -54.3 -54.6 66 -99 SPO 1997 10 19 03 26 -999 -99.9 -9 676.10 -55.1 -54.3 -54.6 66 -99 SPO 1997 10 19 03 27 -999 -99.9 -9 676.10 -55.1 -54.3 -54.6 66 -99 SPO 1997 10 19 03 28 -999 -99.9 -9 676.10 -55.1 -54.3 -54.6 66 -99 SPO 1997 10 19 03 29 -999 -99.9 -9 676.10 -55.2 -54.3 -54.6 66 -99 SPO 1997 10 19 03 30 -999 -99.9 -9 676.10 -55.2 -54.3 -54.6 66 -99 SPO 1997 10 19 03 31 -999 -99.9 -9 676.10 -55.1 -54.4 -54.6 63 -99 SPO 1997 10 19 03 32 -999 -99.9 -9 676.10 -55.1 -54.4 -54.5 63 -99 SPO 1997 10 19 03 33 -999 -99.9 -9 676.20 -55.2 -54.5 -54.5 65 -99 SPO 1997 10 19 03 34 -999 -99.9 -9 676.20 -55.2 -54.5 -54.5 66 -99 SPO 1997 10 19 03 35 -999 -99.9 -9 676.20 -55.2 -54.6 -54.5 66 -99 SPO 1997 10 19 03 36 -999 -99.9 -9 676.20 -55.2 -54.6 -54.4 67 -99 SPO 1997 10 19 03 37 -999 -99.9 -9 676.20 -55.2 -54.6 -54.4 67 -99 SPO 1997 10 19 03 38 -999 -99.9 -9 676.20 -55.2 -54.7 -54.4 67 -99 SPO 1997 10 19 03 39 -999 -99.9 -9 676.20 -55.3 -54.7 -54.4 68 -99 SPO 1997 10 19 03 40 -999 -99.9 -9 676.20 -55.3 -54.7 -54.4 67 -99 SPO 1997 10 19 03 41 -999 -99.9 -9 676.20 -55.2 -54.7 -54.4 66 -99 SPO 1997 10 19 03 42 -999 -99.9 -9 676.20 -55.2 -54.7 -54.3 66 -99 SPO 1997 10 19 03 43 -999 -99.9 -9 676.20 -55.2 -54.7 -54.3 66 -99 SPO 1997 10 19 03 44 -999 -99.9 -9 676.20 -55.2 -54.7 -54.3 66 -99 SPO 1997 10 19 03 45 -999 -99.9 -9 676.20 -55.2 -54.7 -54.3 66 -99 SPO 1997 10 19 03 46 -999 -99.9 -9 676.20 -55.1 -54.6 -54.3 66 -99 SPO 1997 10 19 03 47 -999 -99.9 -9 676.20 -55.1 -54.5 -54.4 66 -99 SPO 1997 10 19 03 48 -999 -99.9 -9 676.20 -55.0 -54.2 -54.4 65 -99 SPO 1997 10 19 03 49 -999 -99.9 -9 676.20 -55.0 -54.0 -54.4 66 -99 SPO 1997 10 19 03 50 -999 -99.9 -9 676.10 -55.0 -53.7 -54.5 66 -99 SPO 1997 10 19 03 51 -999 -99.9 -9 676.00 -55.0 -53.5 -54.5 66 -99 SPO 1997 10 19 03 52 -999 -99.9 -9 676.00 -54.9 -53.3 -54.5 65 -99 SPO 1997 10 19 03 53 -999 -99.9 -9 676.00 -54.9 -53.2 -54.6 65 -99 SPO 1997 10 19 03 54 -999 -99.9 -9 675.90 -54.9 -53.2 -54.6 65 -99 SPO 1997 10 19 03 55 -999 -99.9 -9 675.90 -54.9 -53.2 -54.6 64 -99 SPO 1997 10 19 03 56 -999 -99.9 -9 675.90 -54.9 -53.1 -54.6 64 -99 SPO 1997 10 19 03 57 -999 -99.9 -9 675.90 -54.9 -53.1 -54.6 64 -99 SPO 1997 10 19 03 58 -999 -99.9 -9 675.90 -54.8 -53.1 -54.6 64 -99 SPO 1997 10 19 03 59 -999 -99.9 -9 675.90 -54.8 -53.1 -54.6 65 -99 SPO 1997 10 19 04 00 -999 -99.9 -9 675.90 -54.8 -53.1 -54.6 66 0 SPO 1997 10 19 04 01 -999 -99.9 -9 675.90 -54.8 -53.1 -54.6 66 -99 SPO 1997 10 19 04 02 -999 -99.9 -9 675.90 -54.8 -53.1 -54.7 66 -99 SPO 1997 10 19 04 03 -999 -99.9 -9 676.00 -54.8 -53.0 -54.7 65 -99 SPO 1997 10 19 04 04 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 66 -99 SPO 1997 10 19 04 05 -999 -99.9 -9 676.00 -54.9 -53.0 -54.7 66 -99 SPO 1997 10 19 04 06 -999 -99.9 -9 676.00 -54.9 -53.0 -54.6 65 -99 SPO 1997 10 19 04 07 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 65 -99 SPO 1997 10 19 04 08 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 65 -99 SPO 1997 10 19 04 09 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 65 -99 SPO 1997 10 19 04 10 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 65 -99 SPO 1997 10 19 04 11 -999 -99.9 -9 676.00 -54.9 -53.1 -54.6 65 -99 SPO 1997 10 19 04 12 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 66 -99 SPO 1997 10 19 04 13 -999 -99.9 -9 676.00 -54.8 -53.1 -54.7 65 -99 SPO 1997 10 19 04 14 -999 -99.9 -9 676.00 -54.9 -53.1 -54.7 66 -99 SPO 1997 10 19 04 15 -999 -99.9 -9 676.00 -54.8 -53.1 -54.6 65 -99 SPO 1997 10 19 04 16 -999 -99.9 -9 676.00 -54.9 -53.1 -54.6 65 -99 SPO 1997 10 19 04 17 -999 -99.9 -9 676.00 -54.8 -53.1 -54.6 64 -99 SPO 1997 10 19 04 18 -999 -99.9 -9 676.00 -54.8 -53.2 -54.6 64 -99 SPO 1997 10 19 04 19 -999 -99.9 -9 676.00 -54.8 -53.3 -54.6 63 -99 SPO 1997 10 19 04 20 -999 -99.9 -9 676.10 -54.8 -53.3 -54.6 64 -99 SPO 1997 10 19 04 21 -999 -99.9 -9 676.10 -54.9 -53.3 -54.6 65 -99 SPO 1997 10 19 04 22 -999 -99.9 -9 676.10 -54.9 -53.3 -54.6 66 -99 SPO 1997 10 19 04 23 -999 -99.9 -9 676.10 -54.9 -53.3 -54.6 66 -99 SPO 1997 10 19 04 24 -999 -99.9 -9 676.10 -54.8 -53.3 -54.6 66 -99 SPO 1997 10 19 04 25 -999 -99.9 -9 676.00 -54.8 -53.3 -54.6 66 -99 SPO 1997 10 19 04 26 -999 -99.9 -9 676.00 -54.8 -53.3 -54.6 66 -99 SPO 1997 10 19 04 27 -999 -99.9 -9 676.00 -54.8 -53.3 -54.6 66 -99 SPO 1997 10 19 04 28 -999 -99.9 -9 676.10 -54.9 -53.3 -54.7 67 -99 SPO 1997 10 19 04 29 -999 -99.9 -9 676.10 -54.8 -53.3 -54.7 66 -99 SPO 1997 10 19 04 30 -999 -99.9 -9 676.10 -54.8 -53.3 -54.7 66 -99 SPO 1997 10 19 04 31 -999 -99.9 -9 676.10 -54.8 -53.3 -54.7 65 -99 SPO 1997 10 19 04 32 -999 -99.9 -9 676.10 -54.8 -53.4 -54.7 64 -99 SPO 1997 10 19 04 33 -999 -99.9 -9 676.10 -54.9 -53.4 -54.7 65 -99 SPO 1997 10 19 04 34 -999 -99.9 -9 676.10 -54.9 -53.4 -54.7 65 -99 SPO 1997 10 19 04 35 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 65 -99 SPO 1997 10 19 04 36 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 04 37 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 04 38 -999 -99.9 -9 676.20 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 04 39 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 04 40 -999 -99.9 -9 676.20 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 04 41 -999 -99.9 -9 676.20 -55.0 -53.5 -54.8 65 -99 SPO 1997 10 19 04 42 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 64 -99 SPO 1997 10 19 04 43 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 64 -99 SPO 1997 10 19 04 44 -999 -99.9 -9 676.10 -55.0 -53.5 -54.8 64 -99 SPO 1997 10 19 04 45 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 64 -99 SPO 1997 10 19 04 46 -999 -99.9 -9 676.10 -54.9 -53.6 -54.8 64 -99 SPO 1997 10 19 04 47 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 65 -99 SPO 1997 10 19 04 48 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 65 -99 SPO 1997 10 19 04 49 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 65 -99 SPO 1997 10 19 04 50 -999 -99.9 -9 676.10 -54.9 -53.5 -54.8 65 -99 SPO 1997 10 19 04 51 -999 -99.9 -9 676.10 -54.8 -53.5 -54.8 65 -99 SPO 1997 10 19 04 52 -999 -99.9 -9 676.00 -54.8 -53.5 -54.8 64 -99 SPO 1997 10 19 04 53 -999 -99.9 -9 676.00 -54.8 -53.6 -54.8 64 -99 SPO 1997 10 19 04 54 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 63 -99 SPO 1997 10 19 04 55 -999 -99.9 -9 676.00 -54.8 -53.5 -54.8 63 -99 SPO 1997 10 19 04 56 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 64 -99 SPO 1997 10 19 04 57 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 65 -99 SPO 1997 10 19 04 58 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 66 -99 SPO 1997 10 19 04 59 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 66 -99 SPO 1997 10 19 05 00 -999 -99.9 -9 676.00 -54.7 -53.6 -54.7 65 0 SPO 1997 10 19 05 01 -999 -99.9 -9 676.00 -54.7 -53.6 -54.7 65 -99 SPO 1997 10 19 05 02 -999 -99.9 -9 676.00 -54.7 -53.7 -54.7 66 -99 SPO 1997 10 19 05 03 -999 -99.9 -9 676.00 -54.7 -53.7 -54.7 65 -99 SPO 1997 10 19 05 04 -999 -99.9 -9 676.00 -54.7 -53.7 -54.7 65 -99 SPO 1997 10 19 05 05 -999 -99.9 -9 676.00 -54.8 -53.7 -54.7 65 -99 SPO 1997 10 19 05 06 -999 -99.9 -9 676.00 -54.8 -53.7 -54.8 65 -99 SPO 1997 10 19 05 07 -999 -99.9 -9 676.00 -54.8 -53.7 -54.8 64 -99 SPO 1997 10 19 05 08 -999 -99.9 -9 676.00 -54.8 -53.7 -54.8 64 -99 SPO 1997 10 19 05 09 -999 -99.9 -9 676.00 -54.8 -53.6 -54.8 64 -99 SPO 1997 10 19 05 10 -999 -99.9 -9 676.00 -54.7 -53.6 -54.8 64 -99 SPO 1997 10 19 05 11 -999 -99.9 -9 676.00 -54.7 -53.5 -54.7 65 -99 SPO 1997 10 19 05 12 -999 -99.9 -9 676.00 -54.7 -53.5 -54.7 65 -99 SPO 1997 10 19 05 13 -999 -99.9 -9 676.00 -54.7 -53.5 -54.7 65 -99 SPO 1997 10 19 05 14 -999 -99.9 -9 676.00 -54.7 -53.6 -54.7 65 -99 SPO 1997 10 19 05 15 -999 -99.9 -9 676.00 -54.7 -53.6 -54.7 65 -99 SPO 1997 10 19 05 16 -999 -99.9 -9 676.00 -54.6 -53.6 -54.7 64 -99 SPO 1997 10 19 05 17 -999 -99.9 -9 676.00 -54.5 -53.7 -54.6 63 -99 SPO 1997 10 19 05 18 -999 -99.9 -9 676.00 -54.6 -53.7 -54.6 64 -99 SPO 1997 10 19 05 19 -999 -99.9 -9 676.00 -54.6 -53.7 -54.6 64 -99 SPO 1997 10 19 05 20 -999 -99.9 -9 676.00 -54.6 -53.8 -54.6 64 -99 SPO 1997 10 19 05 21 -999 -99.9 -9 676.00 -54.6 -53.9 -54.6 65 -99 SPO 1997 10 19 05 22 -999 -99.9 -9 676.00 -54.6 -53.9 -54.7 65 -99 SPO 1997 10 19 05 23 -999 -99.9 -9 676.00 -54.7 -54.0 -54.7 66 -99 SPO 1997 10 19 05 24 -999 -99.9 -9 676.00 -54.7 -54.0 -54.8 65 -99 SPO 1997 10 19 05 25 -999 -99.9 -9 676.00 -54.8 -54.0 -54.8 66 -99 SPO 1997 10 19 05 26 -999 -99.9 -9 676.00 -54.8 -54.0 -54.8 66 -99 SPO 1997 10 19 05 27 -999 -99.9 -9 676.00 -54.8 -54.0 -54.8 66 -99 SPO 1997 10 19 05 28 -999 -99.9 -9 676.00 -54.8 -54.0 -54.8 65 -99 SPO 1997 10 19 05 29 -999 -99.9 -9 676.00 -54.8 -53.9 -54.8 65 -99 SPO 1997 10 19 05 30 -999 -99.9 -9 676.00 -54.8 -53.9 -54.8 64 -99 SPO 1997 10 19 05 31 -999 -99.9 -9 676.00 -54.8 -53.9 -54.9 63 -99 SPO 1997 10 19 05 32 -999 -99.9 -9 676.00 -54.9 -54.0 -54.9 65 -99 SPO 1997 10 19 05 33 -999 -99.9 -9 676.00 -54.9 -54.0 -54.9 65 -99 SPO 1997 10 19 05 34 -999 -99.9 -9 676.00 -54.8 -54.0 -54.9 64 -99 SPO 1997 10 19 05 35 -999 -99.9 -9 676.00 -54.8 -54.0 -54.9 64 -99 SPO 1997 10 19 05 36 -999 -99.9 -9 676.00 -54.8 -54.0 -54.9 65 -99 SPO 1997 10 19 05 37 -999 -99.9 -9 676.00 -54.9 -54.0 -54.9 66 -99 SPO 1997 10 19 05 38 -999 -99.9 -9 676.00 -54.9 -54.0 -54.9 66 -99 SPO 1997 10 19 05 39 -999 -99.9 -9 676.00 -54.9 -54.0 -54.9 65 -99 SPO 1997 10 19 05 40 -999 -99.9 -9 676.00 -54.9 -53.9 -54.9 64 -99 SPO 1997 10 19 05 41 -999 -99.9 -9 676.00 -54.9 -53.9 -54.9 63 -99 SPO 1997 10 19 05 42 -999 -99.9 -9 676.00 -54.9 -53.9 -54.9 63 -99 SPO 1997 10 19 05 43 -999 -99.9 -9 676.00 -54.9 -53.9 -54.9 63 -99 SPO 1997 10 19 05 44 -999 -99.9 -9 676.00 -55.0 -53.9 -54.9 64 -99 SPO 1997 10 19 05 45 -999 -99.9 -9 676.00 -54.9 -53.8 -54.9 64 -99 SPO 1997 10 19 05 46 -999 -99.9 -9 676.10 -54.9 -53.8 -54.9 65 -99 SPO 1997 10 19 05 47 -999 -99.9 -9 676.10 -54.9 -53.8 -54.9 65 -99 SPO 1997 10 19 05 48 -999 -99.9 -9 676.10 -54.9 -53.8 -54.9 65 -99 SPO 1997 10 19 05 49 -999 -99.9 -9 676.10 -54.9 -53.8 -54.8 65 -99 SPO 1997 10 19 05 50 -999 -99.9 -9 676.10 -54.9 -53.8 -54.8 65 -99 SPO 1997 10 19 05 51 -999 -99.9 -9 676.10 -54.8 -53.9 -54.8 64 -99 SPO 1997 10 19 05 52 -999 -99.9 -9 676.10 -54.8 -53.8 -54.8 64 -99 SPO 1997 10 19 05 53 -999 -99.9 -9 676.00 -54.9 -53.9 -54.8 65 -99 SPO 1997 10 19 05 54 -999 -99.9 -9 676.00 -54.9 -53.9 -54.8 65 -99 SPO 1997 10 19 05 55 -999 -99.9 -9 676.10 -54.9 -53.9 -54.9 64 -99 SPO 1997 10 19 05 56 -999 -99.9 -9 676.10 -54.9 -53.9 -54.8 64 -99 SPO 1997 10 19 05 57 -999 -99.9 -9 676.10 -54.9 -54.0 -54.8 65 -99 SPO 1997 10 19 05 58 -999 -99.9 -9 676.10 -54.9 -53.9 -54.8 65 -99 SPO 1997 10 19 05 59 -999 -99.9 -9 676.10 -54.9 -53.9 -54.8 64 -99 SPO 1997 10 19 06 00 -999 -99.9 -9 676.10 -54.9 -53.9 -54.9 64 0 SPO 1997 10 19 06 01 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 66 -99 SPO 1997 10 19 06 02 -999 -99.9 -9 676.10 -54.9 -53.8 -54.8 65 -99 SPO 1997 10 19 06 03 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 66 -99 SPO 1997 10 19 06 04 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 65 -99 SPO 1997 10 19 06 05 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 64 -99 SPO 1997 10 19 06 06 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 64 -99 SPO 1997 10 19 06 07 -999 -99.9 -9 676.10 -55.0 -53.8 -54.9 64 -99 SPO 1997 10 19 06 08 -999 -99.9 -9 676.00 -55.0 -53.8 -54.9 64 -99 SPO 1997 10 19 06 09 -999 -99.9 -9 676.00 -55.0 -53.8 -54.9 64 -99 SPO 1997 10 19 06 10 -999 -99.9 -9 676.00 -55.1 -53.7 -55.0 66 -99 SPO 1997 10 19 06 11 -999 -99.9 -9 676.00 -55.1 -53.7 -54.9 66 -99 SPO 1997 10 19 06 12 -999 -99.9 -9 676.00 -55.0 -53.7 -54.9 65 -99 SPO 1997 10 19 06 13 -999 -99.9 -9 676.00 -55.0 -53.6 -54.9 65 -99 SPO 1997 10 19 06 14 -999 -99.9 -9 676.00 -55.0 -53.6 -54.9 65 -99 SPO 1997 10 19 06 15 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 64 -99 SPO 1997 10 19 06 16 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 63 -99 SPO 1997 10 19 06 17 -999 -99.9 -9 676.00 -54.9 -53.7 -54.8 63 -99 SPO 1997 10 19 06 18 -999 -99.9 -9 676.10 -54.8 -53.6 -54.8 62 -99 SPO 1997 10 19 06 19 -999 -99.9 -9 676.10 -54.8 -53.6 -54.8 62 -99 SPO 1997 10 19 06 20 -999 -99.9 -9 676.10 -54.8 -53.6 -54.8 63 -99 SPO 1997 10 19 06 21 -999 -99.9 -9 676.00 -54.8 -53.6 -54.7 64 -99 SPO 1997 10 19 06 22 -999 -99.9 -9 676.10 -54.9 -53.7 -54.8 65 -99 SPO 1997 10 19 06 23 -999 -99.9 -9 676.10 -54.9 -53.7 -54.8 66 -99 SPO 1997 10 19 06 24 -999 -99.9 -9 676.10 -54.9 -53.7 -54.8 66 -99 SPO 1997 10 19 06 25 -999 -99.9 -9 676.10 -55.0 -53.6 -54.8 66 -99 SPO 1997 10 19 06 26 -999 -99.9 -9 676.10 -54.9 -53.6 -54.8 66 -99 SPO 1997 10 19 06 27 -999 -99.9 -9 676.10 -54.9 -53.6 -54.8 66 -99 SPO 1997 10 19 06 28 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 65 -99 SPO 1997 10 19 06 29 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 65 -99 SPO 1997 10 19 06 30 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 65 -99 SPO 1997 10 19 06 31 -999 -99.9 -9 676.00 -54.9 -53.6 -54.8 64 -99 SPO 1997 10 19 06 32 -999 -99.9 -9 676.00 -55.0 -53.6 -54.9 65 -99 SPO 1997 10 19 06 33 -999 -99.9 -9 676.00 -55.0 -53.6 -54.8 65 -99 SPO 1997 10 19 06 34 -999 -99.9 -9 676.00 -55.0 -53.6 -54.9 66 -99 SPO 1997 10 19 06 35 -999 -99.9 -9 676.00 -55.0 -53.6 -54.9 66 -99 SPO 1997 10 19 06 36 -999 -99.9 -9 676.00 -55.0 -53.5 -54.9 66 -99 SPO 1997 10 19 06 37 -999 -99.9 -9 676.00 -55.0 -53.5 -54.9 66 -99 SPO 1997 10 19 06 38 -999 -99.9 -9 676.00 -55.0 -53.5 -54.9 66 -99 SPO 1997 10 19 06 39 -999 -99.9 -9 676.00 -55.0 -53.5 -54.8 66 -99 SPO 1997 10 19 06 40 -999 -99.9 -9 676.00 -55.0 -53.4 -54.8 66 -99 SPO 1997 10 19 06 41 -999 -99.9 -9 676.00 -55.0 -53.5 -54.9 65 -99 SPO 1997 10 19 06 42 -999 -99.9 -9 676.00 -54.9 -53.4 -54.8 64 -99 SPO 1997 10 19 06 43 -999 -99.9 -9 676.00 -54.9 -53.5 -54.8 63 -99 SPO 1997 10 19 06 44 -999 -99.9 -9 676.00 -54.9 -53.5 -54.8 64 -99 SPO 1997 10 19 06 45 -999 -99.9 -9 676.00 -54.9 -53.4 -54.8 64 -99 SPO 1997 10 19 06 46 -999 -99.9 -9 676.00 -54.8 -53.4 -54.7 64 -99 SPO 1997 10 19 06 47 -999 -99.9 -9 676.00 -54.8 -53.4 -54.7 64 -99 SPO 1997 10 19 06 48 -999 -99.9 -9 676.00 -54.8 -53.4 -54.7 65 -99 SPO 1997 10 19 06 49 -999 -99.9 -9 676.00 -54.7 -53.3 -54.7 64 -99 SPO 1997 10 19 06 50 -999 -99.9 -9 676.00 -54.7 -53.3 -54.7 64 -99 SPO 1997 10 19 06 51 -999 -99.9 -9 676.00 -54.7 -53.2 -54.6 64 -99 SPO 1997 10 19 06 52 -999 -99.9 -9 676.00 -54.7 -53.3 -54.6 64 -99 SPO 1997 10 19 06 53 -999 -99.9 -9 676.00 -54.7 -53.3 -54.6 64 -99 SPO 1997 10 19 06 54 -999 -99.9 -9 676.00 -54.6 -53.3 -54.6 63 -99 SPO 1997 10 19 06 55 -999 -99.9 -9 676.00 -54.7 -53.3 -54.6 65 -99 SPO 1997 10 19 06 56 -999 -99.9 -9 676.00 -54.7 -53.4 -54.6 65 -99 SPO 1997 10 19 06 57 -999 -99.9 -9 676.00 -54.6 -53.4 -54.6 65 -99 SPO 1997 10 19 06 58 -999 -99.9 -9 676.00 -54.6 -53.3 -54.6 65 -99 SPO 1997 10 19 06 59 -999 -99.9 -9 676.00 -54.6 -53.3 -54.6 65 -99 SPO 1997 10 19 07 00 -999 -99.9 -9 676.00 -54.7 -53.4 -54.6 66 0 SPO 1997 10 19 07 01 -999 -99.9 -9 675.90 -54.7 -53.3 -54.6 66 -99 SPO 1997 10 19 07 02 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 65 -99 SPO 1997 10 19 07 03 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 64 -99 SPO 1997 10 19 07 04 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 64 -99 SPO 1997 10 19 07 05 -999 -99.9 -9 675.90 -54.6 -53.3 -54.6 63 -99 SPO 1997 10 19 07 06 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 63 -99 SPO 1997 10 19 07 07 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 63 -99 SPO 1997 10 19 07 08 -999 -99.9 -9 675.90 -54.7 -53.4 -54.6 65 -99 SPO 1997 10 19 07 09 -999 -99.9 -9 675.90 -54.7 -53.5 -54.6 65 -99 SPO 1997 10 19 07 10 -999 -99.9 -9 675.90 -54.7 -53.5 -54.6 66 -99 SPO 1997 10 19 07 11 -999 -99.9 -9 675.90 -54.8 -53.5 -54.7 66 -99 SPO 1997 10 19 07 12 -999 -99.9 -9 675.90 -54.8 -53.5 -54.6 66 -99 SPO 1997 10 19 07 13 -999 -99.9 -9 675.90 -54.7 -53.5 -54.6 66 -99 SPO 1997 10 19 07 14 -999 -99.9 -9 675.90 -54.7 -53.5 -54.6 65 -99 SPO 1997 10 19 07 15 -999 -99.9 -9 676.00 -54.6 -53.5 -54.6 64 -99 SPO 1997 10 19 07 16 -999 -99.9 -9 676.00 -54.6 -53.5 -54.6 64 -99 SPO 1997 10 19 07 17 -999 -99.9 -9 675.90 -54.6 -53.5 -54.6 64 -99 SPO 1997 10 19 07 18 -999 -99.9 -9 675.90 -54.6 -53.4 -54.5 64 -99 SPO 1997 10 19 07 19 -999 -99.9 -9 675.90 -54.5 -53.4 -54.6 63 -99 SPO 1997 10 19 07 20 -999 -99.9 -9 675.90 -54.6 -53.4 -54.6 64 -99 SPO 1997 10 19 07 21 -999 -99.9 -9 675.90 -54.6 -53.4 -54.5 65 -99 SPO 1997 10 19 07 22 -999 -99.9 -9 675.90 -54.5 -53.3 -54.5 64 -99 SPO 1997 10 19 07 23 -999 -99.9 -9 675.90 -54.5 -53.3 -54.5 64 -99 SPO 1997 10 19 07 24 -999 -99.9 -9 675.90 -54.5 -53.3 -54.4 65 -99 SPO 1997 10 19 07 25 -999 -99.9 -9 675.90 -54.6 -53.2 -54.5 66 -99 SPO 1997 10 19 07 26 -999 -99.9 -9 675.90 -54.5 -53.2 -54.4 65 -99 SPO 1997 10 19 07 27 -999 -99.9 -9 675.90 -54.5 -53.3 -54.4 64 -99 SPO 1997 10 19 07 28 -999 -99.9 -9 675.90 -54.5 -53.2 -54.4 64 -99 SPO 1997 10 19 07 29 -999 -99.9 -9 675.90 -54.5 -53.2 -54.4 64 -99 SPO 1997 10 19 07 30 -999 -99.9 -9 675.90 -54.5 -53.2 -54.4 64 -99 SPO 1997 10 19 07 31 -999 -99.9 -9 675.90 -54.5 -53.2 -54.3 65 -99 SPO 1997 10 19 07 32 -999 -99.9 -9 675.90 -54.5 -53.2 -54.3 66 -99 SPO 1997 10 19 07 33 -999 -99.9 -9 675.90 -54.5 -53.2 -54.3 67 -99 SPO 1997 10 19 07 34 -999 -99.9 -9 676.00 -54.4 -53.1 -54.3 67 -99 SPO 1997 10 19 07 35 -999 -99.9 -9 675.90 -54.4 -53.1 -54.3 67 -99 SPO 1997 10 19 07 36 -999 -99.9 -9 675.90 -54.4 -53.1 -54.3 67 -99 SPO 1997 10 19 07 37 -999 -99.9 -9 675.90 -54.4 -53.0 -54.3 67 -99 SPO 1997 10 19 07 38 -999 -99.9 -9 675.90 -54.4 -53.1 -54.2 67 -99 SPO 1997 10 19 07 39 -999 -99.9 -9 675.90 -54.4 -53.1 -54.2 67 -99 SPO 1997 10 19 07 40 -999 -99.9 -9 675.90 -54.4 -53.1 -54.2 67 -99 SPO 1997 10 19 07 41 -999 -99.9 -9 675.90 -54.4 -53.1 -54.2 67 -99 SPO 1997 10 19 07 42 -999 -99.9 -9 675.90 -54.4 -53.1 -54.3 67 -99 SPO 1997 10 19 07 43 -999 -99.9 -9 675.90 -54.5 -53.1 -54.3 67 -99 SPO 1997 10 19 07 44 -999 -99.9 -9 675.90 -54.5 -53.1 -54.3 67 -99 SPO 1997 10 19 07 45 -999 -99.9 -9 675.90 -54.5 -53.0 -54.3 67 -99 SPO 1997 10 19 07 46 -999 -99.9 -9 675.90 -54.5 -53.0 -54.3 68 -99 SPO 1997 10 19 07 47 -999 -99.9 -9 675.90 -54.5 -53.0 -54.3 67 -99 SPO 1997 10 19 07 48 -999 -99.9 -9 675.90 -54.5 -52.9 -54.3 67 -99 SPO 1997 10 19 07 49 -999 -99.9 -9 675.90 -54.5 -52.9 -54.3 67 -99 SPO 1997 10 19 07 50 -999 -99.9 -9 675.90 -54.4 -52.8 -54.2 67 -99 SPO 1997 10 19 07 51 -999 -99.9 -9 675.90 -54.5 -52.8 -54.3 66 -99 SPO 1997 10 19 07 52 -999 -99.9 -9 675.90 -54.5 -52.8 -54.3 65 -99 SPO 1997 10 19 07 53 -999 -99.9 -9 675.90 -54.5 -52.7 -54.3 65 -99 SPO 1997 10 19 07 54 -999 -99.9 -9 675.90 -54.5 -52.7 -54.3 64 -99 SPO 1997 10 19 07 55 -999 -99.9 -9 675.90 -54.5 -52.7 -54.3 65 -99 SPO 1997 10 19 07 56 -999 -99.9 -9 675.80 -54.5 -52.7 -54.3 66 -99 SPO 1997 10 19 07 57 -999 -99.9 -9 675.80 -54.5 -52.7 -54.3 67 -99 SPO 1997 10 19 07 58 -999 -99.9 -9 675.80 -54.5 -52.7 -54.2 67 -99 SPO 1997 10 19 07 59 -999 -99.9 -9 675.80 -54.4 -52.6 -54.2 67 -99 SPO 1997 10 19 08 00 -999 -99.9 -9 675.80 -54.5 -52.6 -54.3 68 0 SPO 1997 10 19 08 01 -999 -99.9 -9 675.80 -54.5 -52.5 -54.3 69 -99 SPO 1997 10 19 08 02 -999 -99.9 -9 675.80 -54.4 -52.4 -54.2 68 -99 SPO 1997 10 19 08 03 -999 -99.9 -9 675.80 -54.4 -52.4 -54.2 67 -99 SPO 1997 10 19 08 04 -999 -99.9 -9 675.80 -54.4 -52.3 -54.2 67 -99 SPO 1997 10 19 08 05 -999 -99.9 -9 675.80 -54.4 -52.3 -54.2 67 -99 SPO 1997 10 19 08 06 -999 -99.9 -9 675.80 -54.3 -52.3 -54.1 67 -99 SPO 1997 10 19 08 07 -999 -99.9 -9 675.80 -54.3 -52.4 -54.1 67 -99 SPO 1997 10 19 08 08 -999 -99.9 -9 675.80 -54.3 -52.4 -54.1 67 -99 SPO 1997 10 19 08 09 -999 -99.9 -9 675.80 -54.3 -52.3 -54.2 67 -99 SPO 1997 10 19 08 10 -999 -99.9 -9 675.80 -54.3 -52.4 -54.1 67 -99 SPO 1997 10 19 08 11 -999 -99.9 -9 675.80 -54.3 -52.4 -54.2 67 -99 SPO 1997 10 19 08 12 -999 -99.9 -9 675.80 -54.3 -52.4 -54.2 67 -99 SPO 1997 10 19 08 13 -999 -99.9 -9 675.80 -54.4 -52.5 -54.2 68 -99 SPO 1997 10 19 08 14 -999 -99.9 -9 675.80 -54.4 -52.6 -54.2 68 -99 SPO 1997 10 19 08 15 -999 -99.9 -9 675.80 -54.4 -52.5 -54.2 67 -99 SPO 1997 10 19 08 16 -999 -99.9 -9 675.80 -54.4 -52.5 -54.2 67 -99 SPO 1997 10 19 08 17 -999 -99.9 -9 675.80 -54.4 -52.4 -54.2 67 -99 SPO 1997 10 19 08 18 -999 -99.9 -9 675.80 -54.4 -52.4 -54.2 67 -99 SPO 1997 10 19 08 19 -999 -99.9 -9 675.80 -54.4 -52.5 -54.2 67 -99 SPO 1997 10 19 08 20 -999 -99.9 -9 675.80 -54.4 -52.6 -54.2 67 -99 SPO 1997 10 19 08 21 -999 -99.9 -9 675.80 -54.3 -52.6 -54.1 67 -99 SPO 1997 10 19 08 22 -999 -99.9 -9 675.80 -54.3 -52.7 -54.1 67 -99 SPO 1997 10 19 08 23 -999 -99.9 -9 675.80 -54.3 -52.7 -54.1 67 -99 SPO 1997 10 19 08 24 -999 -99.9 -9 675.90 -54.4 -52.8 -54.2 67 -99 SPO 1997 10 19 08 25 -999 -99.9 -9 675.90 -54.4 -52.8 -54.2 67 -99 SPO 1997 10 19 08 26 -999 -99.9 -9 675.90 -54.4 -52.9 -54.2 67 -99 SPO 1997 10 19 08 27 -999 -99.9 -9 675.90 -54.5 -53.0 -54.2 67 -99 SPO 1997 10 19 08 28 -999 -99.9 -9 675.90 -54.4 -52.9 -54.2 67 -99 SPO 1997 10 19 08 29 -999 -99.9 -9 675.90 -54.4 -52.9 -54.1 66 -99 SPO 1997 10 19 08 30 -999 -99.9 -9 675.90 -54.4 -52.8 -54.2 66 -99 SPO 1997 10 19 08 31 -999 -99.9 -9 675.90 -54.4 -52.7 -54.2 67 -99 SPO 1997 10 19 08 32 -999 -99.9 -9 675.90 -54.4 -52.8 -54.1 67 -99 SPO 1997 10 19 08 33 -999 -99.9 -9 675.90 -54.4 -53.0 -54.1 67 -99 SPO 1997 10 19 08 34 -999 -99.9 -9 675.90 -54.4 -53.0 -54.1 67 -99 SPO 1997 10 19 08 35 -999 -99.9 -9 675.90 -54.5 -53.0 -54.1 68 -99 SPO 1997 10 19 08 36 -999 -99.9 -9 675.90 -54.5 -53.1 -54.2 68 -99 SPO 1997 10 19 08 37 -999 -99.9 -9 675.90 -54.5 -53.2 -54.2 68 -99 SPO 1997 10 19 08 38 -999 -99.9 -9 676.00 -54.4 -53.2 -54.2 67 -99 SPO 1997 10 19 08 39 -999 -99.9 -9 676.00 -54.4 -53.3 -54.2 67 -99 SPO 1997 10 19 08 40 -999 -99.9 -9 676.00 -54.4 -53.3 -54.1 64 -99 SPO 1997 10 19 08 41 -999 -99.9 -9 676.00 -54.4 -53.4 -54.1 64 -99 SPO 1997 10 19 08 42 -999 -99.9 -9 676.00 -54.5 -53.4 -54.1 65 -99 SPO 1997 10 19 08 43 -999 -99.9 -9 676.00 -54.6 -53.5 -54.2 66 -99 SPO 1997 10 19 08 44 -999 -99.9 -9 676.00 -54.6 -53.6 -54.2 66 -99 SPO 1997 10 19 08 45 -999 -99.9 -9 676.00 -54.6 -53.6 -54.2 66 -99 SPO 1997 10 19 08 46 -999 -99.9 -9 676.00 -54.6 -53.6 -54.2 67 -99 SPO 1997 10 19 08 47 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 67 -99 SPO 1997 10 19 08 48 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 67 -99 SPO 1997 10 19 08 49 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 67 -99 SPO 1997 10 19 08 50 -999 -99.9 -9 676.10 -54.7 -53.6 -54.2 68 -99 SPO 1997 10 19 08 51 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 67 -99 SPO 1997 10 19 08 52 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 66 -99 SPO 1997 10 19 08 53 -999 -99.9 -9 676.10 -54.6 -53.6 -54.2 65 -99 SPO 1997 10 19 08 54 -999 -99.9 -9 676.10 -54.6 -53.7 -54.2 65 -99 SPO 1997 10 19 08 55 -999 -99.9 -9 676.10 -54.6 -53.7 -54.2 66 -99 SPO 1997 10 19 08 56 -999 -99.9 -9 676.10 -54.6 -53.8 -54.1 66 -99 SPO 1997 10 19 08 57 -999 -99.9 -9 676.10 -54.6 -53.8 -54.0 66 -99 SPO 1997 10 19 08 58 -999 -99.9 -9 676.10 -54.6 -53.9 -54.0 67 -99 SPO 1997 10 19 08 59 -999 -99.9 -9 676.10 -54.7 -54.1 -54.0 68 -99 SPO 1997 10 19 09 00 -999 -99.9 -9 676.10 -54.7 -54.2 -54.1 68 0 SPO 1997 10 19 09 01 -999 -99.9 -9 676.10 -54.8 -54.3 -54.0 69 -99 SPO 1997 10 19 09 02 -999 -99.9 -9 676.10 -54.8 -54.4 -54.1 67 -99 SPO 1997 10 19 09 03 -999 -99.9 -9 676.10 -54.8 -54.4 -54.0 67 -99 SPO 1997 10 19 09 04 -999 -99.9 -9 676.10 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 05 -999 -99.9 -9 676.10 -54.8 -54.3 -54.0 66 -99 SPO 1997 10 19 09 06 -999 -99.9 -9 676.10 -54.8 -54.3 -54.0 66 -99 SPO 1997 10 19 09 07 -999 -99.9 -9 676.10 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 08 -999 -99.9 -9 676.10 -54.8 -54.2 -53.9 66 -99 SPO 1997 10 19 09 09 -999 -99.9 -9 676.10 -54.7 -54.2 -53.9 66 -99 SPO 1997 10 19 09 10 -999 -99.9 -9 676.10 -54.7 -54.2 -53.9 66 -99 SPO 1997 10 19 09 11 -999 -99.9 -9 676.10 -54.7 -54.3 -53.9 66 -99 SPO 1997 10 19 09 12 -999 -99.9 -9 676.10 -54.7 -54.3 -53.9 66 -99 SPO 1997 10 19 09 13 -999 -99.9 -9 676.10 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 14 -999 -99.9 -9 676.10 -54.8 -54.3 -54.0 66 -99 SPO 1997 10 19 09 15 -999 -99.9 -9 676.00 -54.8 -54.3 -54.0 66 -99 SPO 1997 10 19 09 16 -999 -99.9 -9 676.00 -54.8 -54.3 -54.0 66 -99 SPO 1997 10 19 09 17 -999 -99.9 -9 676.00 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 18 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 19 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 65 -99 SPO 1997 10 19 09 20 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 21 -999 -99.9 -9 676.00 -54.9 -54.4 -53.9 66 -99 SPO 1997 10 19 09 22 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 23 -999 -99.9 -9 676.00 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 24 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 25 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 26 -999 -99.9 -9 676.00 -54.7 -54.4 -53.9 66 -99 SPO 1997 10 19 09 27 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 28 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 29 -999 -99.9 -9 676.00 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 30 -999 -99.9 -9 676.00 -54.9 -54.3 -53.9 66 -99 SPO 1997 10 19 09 31 -999 -99.9 -9 675.90 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 32 -999 -99.9 -9 675.90 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 33 -999 -99.9 -9 675.90 -54.8 -54.5 -54.0 66 -99 SPO 1997 10 19 09 34 -999 -99.9 -9 675.90 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 35 -999 -99.9 -9 675.90 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 36 -999 -99.9 -9 675.90 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 37 -999 -99.9 -9 675.90 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 38 -999 -99.9 -9 675.90 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 39 -999 -99.9 -9 675.90 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 40 -999 -99.9 -9 675.90 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 41 -999 -99.9 -9 675.90 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 42 -999 -99.9 -9 675.90 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 43 -999 -99.9 -9 675.90 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 44 -999 -99.9 -9 675.90 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 45 -999 -99.9 -9 675.90 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 46 -999 -99.9 -9 675.80 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 47 -999 -99.9 -9 675.80 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 48 -999 -99.9 -9 675.80 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 49 -999 -99.9 -9 675.80 -54.8 -54.4 -54.0 66 -99 SPO 1997 10 19 09 50 -999 -99.9 -9 675.80 -54.9 -54.4 -54.0 67 -99 SPO 1997 10 19 09 51 -999 -99.9 -9 675.80 -54.9 -54.4 -54.0 67 -99 SPO 1997 10 19 09 52 -999 -99.9 -9 675.80 -54.9 -54.4 -54.0 66 -99 SPO 1997 10 19 09 53 -999 -99.9 -9 675.80 -54.8 -54.4 -53.9 66 -99 SPO 1997 10 19 09 54 -999 -99.9 -9 675.80 -54.8 -54.3 -53.9 66 -99 SPO 1997 10 19 09 55 -999 -99.9 -9 675.80 -54.8 -54.2 -53.9 65 -99 SPO 1997 10 19 09 56 -999 -99.9 -9 675.80 -54.7 -54.2 -53.9 65 -99 SPO 1997 10 19 09 57 -999 -99.9 -9 675.80 -54.7 -54.1 -53.9 66 -99 SPO 1997 10 19 09 58 -999 -99.9 -9 675.80 -54.7 -54.0 -53.9 66 -99 SPO 1997 10 19 09 59 -999 -99.9 -9 675.80 -54.7 -54.0 -54.0 66 -99 SPO 1997 10 19 10 00 -999 -99.9 -9 675.80 -54.7 -53.9 -54.0 66 0 SPO 1997 10 19 10 01 -999 -99.9 -9 675.80 -54.6 -53.9 -54.0 65 -99 SPO 1997 10 19 10 02 -999 -99.9 -9 675.80 -54.7 -53.8 -54.0 66 -99 SPO 1997 10 19 10 03 -999 -99.9 -9 675.80 -54.7 -53.8 -54.0 66 -99 SPO 1997 10 19 10 04 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 65 -99 SPO 1997 10 19 10 05 -999 -99.9 -9 675.80 -54.6 -53.7 -54.1 64 -99 SPO 1997 10 19 10 06 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 64 -99 SPO 1997 10 19 10 07 -999 -99.9 -9 675.80 -54.7 -53.7 -54.1 65 -99 SPO 1997 10 19 10 08 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 64 -99 SPO 1997 10 19 10 09 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 66 -99 SPO 1997 10 19 10 10 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 66 -99 SPO 1997 10 19 10 11 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 66 -99 SPO 1997 10 19 10 12 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 66 -99 SPO 1997 10 19 10 13 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 66 -99 SPO 1997 10 19 10 14 -999 -99.9 -9 675.80 -54.6 -53.7 -54.0 67 -99 SPO 1997 10 19 10 15 -999 -99.9 -9 675.80 -54.6 -53.6 -54.0 68 -99 SPO 1997 10 19 10 16 -999 -99.9 -9 675.80 -54.6 -53.6 -54.0 67 -99 SPO 1997 10 19 10 17 -999 -99.9 -9 675.80 -54.5 -53.5 -54.0 66 -99 SPO 1997 10 19 10 18 -999 -99.9 -9 675.80 -54.5 -53.5 -54.0 66 -99 SPO 1997 10 19 10 19 -999 -99.9 -9 675.80 -54.5 -53.6 -54.0 66 -99 SPO 1997 10 19 10 20 -999 -99.9 -9 675.80 -54.4 -53.6 -53.9 66 -99 SPO 1997 10 19 10 21 -999 -99.9 -9 675.80 -54.4 -53.6 -53.9 67 -99 SPO 1997 10 19 10 22 -999 -99.9 -9 675.80 -54.4 -53.6 -53.9 67 -99 SPO 1997 10 19 10 23 -999 -99.9 -9 675.80 -54.4 -53.7 -53.9 67 -99 SPO 1997 10 19 10 24 -999 -99.9 -9 675.80 -54.5 -53.8 -53.9 68 -99 SPO 1997 10 19 10 25 -999 -99.9 -9 675.80 -54.5 -53.9 -53.9 68 -99 SPO 1997 10 19 10 26 -999 -99.9 -9 675.80 -54.5 -53.9 -53.9 68 -99 SPO 1997 10 19 10 27 -999 -99.9 -9 675.80 -54.5 -54.0 -53.8 69 -99 SPO 1997 10 19 10 28 -999 -99.9 -9 675.80 -54.5 -54.0 -53.8 69 -99 SPO 1997 10 19 10 29 -999 -99.9 -9 675.80 -54.5 -54.0 -53.8 69 -99 SPO 1997 10 19 10 30 -999 -99.9 -9 675.80 -54.4 -54.0 -53.8 67 -99 SPO 1997 10 19 10 31 -999 -99.9 -9 675.80 -54.4 -54.0 -53.8 67 -99 SPO 1997 10 19 10 32 -999 -99.9 -9 675.80 -54.4 -54.0 -53.8 67 -99 SPO 1997 10 19 10 33 -999 -99.9 -9 675.80 -54.4 -54.0 -53.7 67 -99 SPO 1997 10 19 10 34 -999 -99.9 -9 675.80 -54.4 -54.0 -53.7 67 -99 SPO 1997 10 19 10 35 -999 -99.9 -9 675.80 -54.4 -54.0 -53.7 67 -99 SPO 1997 10 19 10 36 -999 -99.9 -9 675.80 -54.4 -54.0 -53.7 68 -99 SPO 1997 10 19 10 37 -999 -99.9 -9 675.80 -54.4 -54.0 -53.7 68 -99 SPO 1997 10 19 10 38 -999 -99.9 -9 675.80 -54.3 -54.0 -53.7 67 -99 SPO 1997 10 19 10 39 -999 -99.9 -9 675.80 -54.3 -54.0 -53.7 67 -99 SPO 1997 10 19 10 40 -999 -99.9 -9 675.80 -54.3 -53.9 -53.7 67 -99 SPO 1997 10 19 10 41 -999 -99.9 -9 675.80 -54.3 -54.0 -53.6 67 -99 SPO 1997 10 19 10 42 -999 -99.9 -9 675.80 -54.2 -54.0 -53.6 67 -99 SPO 1997 10 19 10 43 -999 -99.9 -9 675.80 -54.2 -54.0 -53.6 67 -99 SPO 1997 10 19 10 44 -999 -99.9 -9 675.80 -54.2 -54.0 -53.6 67 -99 SPO 1997 10 19 10 45 -999 -99.9 -9 675.80 -54.2 -54.0 -53.5 67 -99 SPO 1997 10 19 10 46 -999 -99.9 -9 675.80 -54.2 -54.0 -53.5 67 -99 SPO 1997 10 19 10 47 -999 -99.9 -9 675.80 -54.2 -53.9 -53.5 68 -99 SPO 1997 10 19 10 48 -999 -99.9 -9 675.80 -54.2 -53.9 -53.4 68 -99 SPO 1997 10 19 10 49 -999 -99.9 -9 675.80 -54.1 -53.9 -53.4 67 -99 SPO 1997 10 19 10 50 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 69 -99 SPO 1997 10 19 10 51 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 69 -99 SPO 1997 10 19 10 52 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 69 -99 SPO 1997 10 19 10 53 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 69 -99 SPO 1997 10 19 10 54 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 68 -99 SPO 1997 10 19 10 55 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 68 -99 SPO 1997 10 19 10 56 -999 -99.9 -9 675.90 -54.1 -53.9 -53.4 67 -99 SPO 1997 10 19 10 57 -999 -99.9 -9 675.90 -54.1 -53.9 -53.4 67 -99 SPO 1997 10 19 10 58 -999 -99.9 -9 675.90 -54.1 -53.9 -53.4 67 -99 SPO 1997 10 19 10 59 -999 -99.9 -9 675.90 -54.1 -53.9 -53.4 67 -99 SPO 1997 10 19 11 00 -999 -99.9 -9 675.90 -54.2 -53.9 -53.4 68 0 SPO 1997 10 19 11 01 -999 -99.9 -9 675.90 -54.1 -54.0 -53.5 67 -99 SPO 1997 10 19 11 02 -999 -99.9 -9 675.90 -54.2 -54.0 -53.4 69 -99 SPO 1997 10 19 11 03 -999 -99.9 -9 675.90 -54.2 -53.9 -53.5 69 -99 SPO 1997 10 19 11 04 -999 -99.9 -9 675.90 -54.2 -53.9 -53.5 69 -99 SPO 1997 10 19 11 05 -999 -99.9 -9 675.90 -54.1 -53.9 -53.5 67 -99 SPO 1997 10 19 11 06 -999 -99.9 -9 675.90 -54.1 -53.8 -53.4 67 -99 SPO 1997 10 19 11 07 -999 -99.9 -9 675.90 -54.1 -53.8 -53.4 67 -99 SPO 1997 10 19 11 08 -999 -99.9 -9 675.80 -54.1 -53.8 -53.4 67 -99 SPO 1997 10 19 11 09 -999 -99.9 -9 675.80 -54.1 -53.8 -53.5 66 -99 SPO 1997 10 19 11 10 -999 -99.9 -9 675.80 -54.0 -53.8 -53.5 65 -99 SPO 1997 10 19 11 11 -999 -99.9 -9 675.80 -54.0 -53.8 -53.5 66 -99 SPO 1997 10 19 11 12 -999 -99.9 -9 675.80 -54.0 -53.7 -53.5 66 -99 SPO 1997 10 19 11 13 -999 -99.9 -9 675.80 -54.0 -53.8 -53.5 67 -99 SPO 1997 10 19 11 14 -999 -99.9 -9 675.80 -54.0 -53.8 -53.6 67 -99 SPO 1997 10 19 11 15 -999 -99.9 -9 675.80 -54.0 -53.7 -53.6 67 -99 SPO 1997 10 19 11 16 -999 -99.9 -9 675.80 -54.0 -53.7 -53.6 67 -99 SPO 1997 10 19 11 17 -999 -99.9 -9 675.80 -54.0 -53.7 -53.6 66 -99 SPO 1997 10 19 11 18 -999 -99.9 -9 675.80 -54.0 -53.7 -53.6 66 -99 SPO 1997 10 19 11 19 -999 -99.9 -9 675.80 -54.0 -53.8 -53.6 66 -99 SPO 1997 10 19 11 20 -999 -99.9 -9 675.80 -54.0 -53.8 -53.6 66 -99 SPO 1997 10 19 11 21 -999 -99.9 -9 675.80 -54.0 -53.8 -53.6 66 -99 SPO 1997 10 19 11 22 -999 -99.9 -9 675.80 -54.0 -53.8 -53.7 66 -99 SPO 1997 10 19 11 23 -999 -99.9 -9 675.80 -54.1 -53.8 -53.7 67 -99 SPO 1997 10 19 11 24 -999 -99.9 -9 675.80 -54.1 -53.8 -53.8 67 -99 SPO 1997 10 19 11 25 -999 -99.9 -9 675.80 -54.1 -53.8 -53.7 67 -99 SPO 1997 10 19 11 26 -999 -99.9 -9 675.80 -54.1 -53.7 -53.7 67 -99 SPO 1997 10 19 11 27 -999 -99.9 -9 675.80 -54.1 -53.7 -53.8 67 -99 SPO 1997 10 19 11 28 -999 -99.9 -9 675.80 -54.1 -53.7 -53.7 67 -99 SPO 1997 10 19 11 29 -999 -99.9 -9 675.80 -54.1 -53.7 -53.7 67 -99 SPO 1997 10 19 11 30 -999 -99.9 -9 675.80 -54.0 -53.6 -53.7 65 -99 SPO 1997 10 19 11 31 -999 -99.9 -9 675.80 -54.1 -53.7 -53.7 66 -99 SPO 1997 10 19 11 32 -999 -99.9 -9 675.80 -54.1 -53.7 -53.8 66 -99 SPO 1997 10 19 11 33 -999 -99.9 -9 675.70 -54.1 -53.6 -53.8 65 -99 SPO 1997 10 19 11 34 -999 -99.9 -9 675.70 -54.1 -53.6 -53.8 65 -99 SPO 1997 10 19 11 35 -999 -99.9 -9 675.70 -54.2 -53.7 -53.8 66 -99 SPO 1997 10 19 11 36 -999 -99.9 -9 675.70 -54.2 -53.7 -53.8 67 -99 SPO 1997 10 19 11 37 -999 -99.9 -9 675.70 -54.2 -53.8 -53.8 67 -99 SPO 1997 10 19 11 38 -999 -99.9 -9 675.70 -54.2 -53.8 -53.8 67 -99 SPO 1997 10 19 11 39 -999 -99.9 -9 675.70 -54.2 -53.8 -53.8 67 -99 SPO 1997 10 19 11 40 -999 -99.9 -9 675.70 -54.2 -53.8 -53.8 67 -99 SPO 1997 10 19 11 41 -999 -99.9 -9 675.70 -54.2 -53.9 -53.8 67 -99 SPO 1997 10 19 11 42 -999 -99.9 -9 675.70 -54.3 -53.9 -53.9 67 -99 SPO 1997 10 19 11 43 -999 -99.9 -9 675.70 -54.3 -53.9 -53.9 67 -99 SPO 1997 10 19 11 44 -999 -99.9 -9 675.70 -54.4 -53.8 -53.9 67 -99 SPO 1997 10 19 11 45 -999 -99.9 -9 675.70 -54.4 -53.9 -53.9 67 -99 SPO 1997 10 19 11 46 -999 -99.9 -9 675.70 -54.4 -53.9 -54.0 67 -99 SPO 1997 10 19 11 47 -999 -99.9 -9 675.70 -54.4 -53.8 -54.0 67 -99 SPO 1997 10 19 11 48 -999 -99.9 -9 675.70 -54.4 -53.8 -54.0 67 -99 SPO 1997 10 19 11 49 -999 -99.9 -9 675.70 -54.3 -53.8 -54.0 66 -99 SPO 1997 10 19 11 50 -999 -99.9 -9 675.70 -54.2 -53.8 -54.0 65 -99 SPO 1997 10 19 11 51 -999 -99.9 -9 675.70 -54.2 -53.7 -54.0 66 -99 SPO 1997 10 19 11 52 -999 -99.9 -9 675.70 -54.3 -53.8 -54.0 67 -99 SPO 1997 10 19 11 53 -999 -99.9 -9 675.70 -54.3 -53.8 -54.0 67 -99 SPO 1997 10 19 11 54 -999 -99.9 -9 675.70 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 19 11 55 -999 -99.9 -9 675.70 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 19 11 56 -999 -99.9 -9 675.60 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 19 11 57 -999 -99.9 -9 675.60 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 19 11 58 -999 -99.9 -9 675.60 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 19 11 59 -999 -99.9 -9 675.60 -54.1 -53.6 -53.8 65 -99 SPO 1997 10 19 12 00 -999 -99.9 -9 675.60 -54.2 -53.6 -53.8 67 0 SPO 1997 10 19 12 01 -999 -99.9 -9 675.60 -54.2 -53.6 -53.8 67 -99 SPO 1997 10 19 12 02 -999 -99.9 -9 675.60 -54.2 -53.5 -53.8 67 -99 SPO 1997 10 19 12 03 -999 -99.9 -9 675.60 -54.1 -53.5 -53.8 67 -99 SPO 1997 10 19 12 04 -999 -99.9 -9 675.60 -54.1 -53.5 -53.8 67 -99 SPO 1997 10 19 12 05 -999 -99.9 -9 675.60 -54.2 -53.5 -53.8 67 -99 SPO 1997 10 19 12 06 -999 -99.9 -9 675.60 -54.1 -53.5 -53.8 67 -99 SPO 1997 10 19 12 07 -999 -99.9 -9 675.60 -54.0 -53.4 -53.7 66 -99 SPO 1997 10 19 12 08 -999 -99.9 -9 675.60 -54.1 -53.5 -53.7 66 -99 SPO 1997 10 19 12 09 -999 -99.9 -9 675.60 -54.1 -53.5 -53.7 66 -99 SPO 1997 10 19 12 10 -999 -99.9 -9 675.60 -54.1 -53.5 -53.7 66 -99 SPO 1997 10 19 12 11 -999 -99.9 -9 675.60 -54.1 -53.5 -53.8 66 -99 SPO 1997 10 19 12 12 -999 -99.9 -9 675.60 -54.1 -53.6 -53.7 67 -99 SPO 1997 10 19 12 13 -999 -99.9 -9 675.60 -54.1 -53.6 -53.7 67 -99 SPO 1997 10 19 12 14 -999 -99.9 -9 675.60 -54.1 -53.6 -53.8 67 -99 SPO 1997 10 19 12 15 -999 -99.9 -9 675.60 -54.1 -53.6 -53.8 67 -99 SPO 1997 10 19 12 16 -999 -99.9 -9 675.60 -54.1 -53.5 -53.8 67 -99 SPO 1997 10 19 12 17 -999 -99.9 -9 675.50 -54.1 -53.5 -53.8 67 -99 SPO 1997 10 19 12 18 -999 -99.9 -9 675.50 -54.2 -53.5 -53.8 68 -99 SPO 1997 10 19 12 19 -999 -99.9 -9 675.50 -54.1 -53.4 -53.8 67 -99 SPO 1997 10 19 12 20 -999 -99.9 -9 675.50 -54.1 -53.4 -53.8 67 -99 SPO 1997 10 19 12 21 -999 -99.9 -9 675.50 -54.0 -53.4 -53.7 66 -99 SPO 1997 10 19 12 22 -999 -99.9 -9 675.50 -54.1 -53.4 -53.7 67 -99 SPO 1997 10 19 12 23 -999 -99.9 -9 675.50 -54.0 -53.4 -53.7 66 -99 SPO 1997 10 19 12 24 -999 -99.9 -9 675.50 -54.0 -53.4 -53.7 67 -99 SPO 1997 10 19 12 25 -999 -99.9 -9 675.50 -54.0 -53.4 -53.6 67 -99 SPO 1997 10 19 12 26 -999 -99.9 -9 675.50 -54.0 -53.5 -53.6 67 -99 SPO 1997 10 19 12 27 -999 -99.9 -9 675.50 -54.0 -53.5 -53.6 68 -99 SPO 1997 10 19 12 28 -999 -99.9 -9 675.50 -54.0 -53.6 -53.7 68 -99 SPO 1997 10 19 12 29 -999 -99.9 -9 675.50 -54.0 -53.6 -53.7 68 -99 SPO 1997 10 19 12 30 -999 -99.9 -9 675.50 -54.0 -53.6 -53.6 68 -99 SPO 1997 10 19 12 31 -999 -99.9 -9 675.50 -54.0 -53.6 -53.6 68 -99 SPO 1997 10 19 12 32 -999 -99.9 -9 675.50 -54.0 -53.5 -53.6 68 -99 SPO 1997 10 19 12 33 -999 -99.9 -9 675.60 -53.9 -53.5 -53.6 67 -99 SPO 1997 10 19 12 34 -999 -99.9 -9 675.60 -53.9 -53.5 -53.6 67 -99 SPO 1997 10 19 12 35 -999 -99.9 -9 675.50 -53.9 -53.4 -53.6 67 -99 SPO 1997 10 19 12 36 -999 -99.9 -9 675.50 -53.9 -53.4 -53.6 67 -99 SPO 1997 10 19 12 37 -999 -99.9 -9 675.50 -53.9 -53.3 -53.6 67 -99 SPO 1997 10 19 12 38 -999 -99.9 -9 675.50 -53.8 -53.3 -53.5 67 -99 SPO 1997 10 19 12 39 -999 -99.9 -9 675.50 -53.8 -53.2 -53.5 67 -99 SPO 1997 10 19 12 40 -999 -99.9 -9 675.50 -53.8 -53.3 -53.5 67 -99 SPO 1997 10 19 12 41 -999 -99.9 -9 675.50 -53.8 -53.2 -53.5 68 -99 SPO 1997 10 19 12 42 -999 -99.9 -9 675.50 -53.8 -53.2 -53.5 68 -99 SPO 1997 10 19 12 43 -999 -99.9 -9 675.50 -53.8 -53.3 -53.6 67 -99 SPO 1997 10 19 12 44 -999 -99.9 -9 675.50 -53.8 -53.4 -53.6 67 -99 SPO 1997 10 19 12 45 -999 -99.9 -9 675.50 -53.8 -53.4 -53.6 67 -99 SPO 1997 10 19 12 46 -999 -99.9 -9 675.50 -53.9 -53.4 -53.6 68 -99 SPO 1997 10 19 12 47 -999 -99.9 -9 675.50 -53.9 -53.5 -53.7 67 -99 SPO 1997 10 19 12 48 -999 -99.9 -9 675.50 -53.9 -53.5 -53.7 67 -99 SPO 1997 10 19 12 49 -999 -99.9 -9 675.50 -53.9 -53.4 -53.7 67 -99 SPO 1997 10 19 12 50 -999 -99.9 -9 675.60 -53.9 -53.4 -53.7 67 -99 SPO 1997 10 19 12 51 -999 -99.9 -9 675.60 -54.0 -53.4 -53.7 68 -99 SPO 1997 10 19 12 52 -999 -99.9 -9 675.60 -54.0 -53.5 -53.8 68 -99 SPO 1997 10 19 12 53 -999 -99.9 -9 675.50 -54.1 -53.5 -53.8 68 -99 SPO 1997 10 19 12 54 -999 -99.9 -9 675.50 -54.1 -53.6 -53.8 68 -99 SPO 1997 10 19 12 55 -999 -99.9 -9 675.50 -54.2 -53.6 -53.8 68 -99 SPO 1997 10 19 12 56 -999 -99.9 -9 675.50 -54.2 -53.6 -53.9 67 -99 SPO 1997 10 19 12 57 -999 -99.9 -9 675.50 -54.1 -53.5 -53.9 67 -99 SPO 1997 10 19 12 58 -999 -99.9 -9 675.50 -54.1 -53.5 -53.9 66 -99 SPO 1997 10 19 12 59 -999 -99.9 -9 675.50 -54.0 -53.5 -53.8 64 -99 SPO 1997 10 19 13 00 -999 -99.9 -9 675.50 -54.1 -53.6 -53.8 65 0 SPO 1997 10 19 13 01 -999 -99.9 -9 675.50 -54.1 -53.6 -53.9 66 -99 SPO 1997 10 19 13 02 -999 -99.9 -9 675.50 -54.1 -53.5 -53.9 66 -99 SPO 1997 10 19 13 03 -999 -99.9 -9 675.50 -54.1 -53.4 -53.9 66 -99 SPO 1997 10 19 13 04 -999 -99.9 -9 675.50 -54.1 -53.5 -53.9 66 -99 SPO 1997 10 19 13 05 -999 -99.9 -9 675.50 -54.1 -53.4 -53.9 66 -99 SPO 1997 10 19 13 06 -999 -99.9 -9 675.50 -54.1 -53.4 -53.9 67 -99 SPO 1997 10 19 13 07 -999 -99.9 -9 675.50 -54.0 -53.3 -53.8 66 -99 SPO 1997 10 19 13 08 -999 -99.9 -9 675.50 -54.0 -53.2 -53.8 66 -99 SPO 1997 10 19 13 09 -999 -99.9 -9 675.50 -53.8 -53.1 -53.6 64 -99 SPO 1997 10 19 13 10 -999 -99.9 -9 675.40 -53.8 -53.1 -53.6 64 -99 SPO 1997 10 19 13 11 -999 -99.9 -9 675.40 -53.8 -53.2 -53.6 64 -99 SPO 1997 10 19 13 12 -999 -99.9 -9 675.40 -53.9 -53.3 -53.7 66 -99 SPO 1997 10 19 13 13 -999 -99.9 -9 675.40 -54.0 -53.3 -53.7 67 -99 SPO 1997 10 19 13 14 -999 -99.9 -9 675.40 -53.9 -53.3 -53.7 66 -99 SPO 1997 10 19 13 15 -999 -99.9 -9 675.40 -53.9 -53.2 -53.6 66 -99 SPO 1997 10 19 13 16 -999 -99.9 -9 675.40 -53.8 -53.2 -53.6 65 -99 SPO 1997 10 19 13 17 -999 -99.9 -9 675.50 -53.8 -53.2 -53.6 65 -99 SPO 1997 10 19 13 18 -999 -99.9 -9 675.50 -53.8 -53.3 -53.5 65 -99 SPO 1997 10 19 13 19 -999 -99.9 -9 675.50 -53.8 -53.3 -53.5 65 -99 SPO 1997 10 19 13 20 -999 -99.9 -9 675.50 -53.7 -53.2 -53.5 64 -99 SPO 1997 10 19 13 21 -999 -99.9 -9 675.50 -53.7 -53.2 -53.5 64 -99 SPO 1997 10 19 13 22 -999 -99.9 -9 675.50 -53.7 -53.2 -53.4 64 -99 SPO 1997 10 19 13 23 -999 -99.9 -9 675.50 -53.6 -53.1 -53.4 64 -99 SPO 1997 10 19 13 24 -999 -99.9 -9 675.50 -53.6 -53.1 -53.4 64 -99 SPO 1997 10 19 13 25 -999 -99.9 -9 675.50 -53.6 -53.1 -53.4 65 -99 SPO 1997 10 19 13 26 -999 -99.9 -9 675.50 -53.6 -53.1 -53.4 65 -99 SPO 1997 10 19 13 27 -999 -99.9 -9 675.50 -53.7 -53.1 -53.4 67 -99 SPO 1997 10 19 13 28 -999 -99.9 -9 675.50 -53.7 -53.2 -53.4 67 -99 SPO 1997 10 19 13 29 -999 -99.9 -9 675.50 -53.7 -53.0 -53.4 67 -99 SPO 1997 10 19 13 30 -999 -99.9 -9 675.50 -53.8 -53.1 -53.4 67 -99 SPO 1997 10 19 13 31 -999 -99.9 -9 675.50 -53.8 -53.1 -53.4 67 -99 SPO 1997 10 19 13 32 -999 -99.9 -9 675.50 -53.8 -53.2 -53.4 67 -99 SPO 1997 10 19 13 33 -999 -99.9 -9 675.50 -53.7 -53.2 -53.3 65 -99 SPO 1997 10 19 13 34 -999 -99.9 -9 675.50 -53.7 -53.3 -53.3 65 -99 SPO 1997 10 19 13 35 -999 -99.9 -9 675.50 -53.7 -53.2 -53.3 66 -99 SPO 1997 10 19 13 36 -999 -99.9 -9 675.50 -53.7 -53.2 -53.3 66 -99 SPO 1997 10 19 13 37 -999 -99.9 -9 675.40 -53.7 -53.2 -53.3 67 -99 SPO 1997 10 19 13 38 -999 -99.9 -9 675.40 -53.7 -53.1 -53.2 67 -99 SPO 1997 10 19 13 39 -999 -99.9 -9 675.50 -53.7 -53.1 -53.2 67 -99 SPO 1997 10 19 13 40 -999 -99.9 -9 675.50 -53.6 -53.1 -53.2 66 -99 SPO 1997 10 19 13 41 -999 -99.9 -9 675.50 -53.6 -53.0 -53.1 67 -99 SPO 1997 10 19 13 42 -999 -99.9 -9 675.50 -53.5 -52.9 -53.1 67 -99 SPO 1997 10 19 13 43 -999 -99.9 -9 675.40 -53.5 -52.9 -53.1 68 -99 SPO 1997 10 19 13 44 -999 -99.9 -9 675.40 -53.4 -52.9 -53.0 67 -99 SPO 1997 10 19 13 45 -999 -99.9 -9 675.40 -53.4 -52.9 -53.0 67 -99 SPO 1997 10 19 13 46 -999 -99.9 -9 675.50 -53.4 -52.8 -53.0 67 -99 SPO 1997 10 19 13 47 -999 -99.9 -9 675.40 -53.5 -52.8 -53.1 68 -99 SPO 1997 10 19 13 48 -999 -99.9 -9 675.40 -53.5 -52.9 -53.1 67 -99 SPO 1997 10 19 13 49 -999 -99.9 -9 675.40 -53.6 -53.0 -53.1 68 -99 SPO 1997 10 19 13 50 -999 -99.9 -9 675.40 -53.6 -53.1 -53.1 68 -99 SPO 1997 10 19 13 51 -999 -99.9 -9 675.50 -53.7 -53.1 -53.2 67 -99 SPO 1997 10 19 13 52 -999 -99.9 -9 675.50 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 19 13 53 -999 -99.9 -9 675.50 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 19 13 54 -999 -99.9 -9 675.50 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 19 13 55 -999 -99.9 -9 675.50 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 19 13 56 -999 -99.9 -9 675.50 -53.7 -53.1 -53.1 67 -99 SPO 1997 10 19 13 57 -999 -99.9 -9 675.50 -53.7 -53.1 -53.1 67 -99 SPO 1997 10 19 13 58 -999 -99.9 -9 675.50 -53.6 -53.1 -53.0 66 -99 SPO 1997 10 19 13 59 -999 -99.9 -9 675.50 -53.6 -53.1 -53.0 65 -99 SPO 1997 10 19 14 00 -999 -99.9 -9 675.50 -53.6 -53.0 -53.1 65 0 SPO 1997 10 19 14 01 -999 -99.9 -9 675.50 -53.7 -53.0 -53.1 66 -99 SPO 1997 10 19 14 02 -999 -99.9 -9 675.50 -53.7 -52.9 -53.1 66 -99 SPO 1997 10 19 14 03 -999 -99.9 -9 675.50 -53.6 -52.9 -53.0 66 -99 SPO 1997 10 19 14 04 -999 -99.9 -9 675.50 -53.6 -52.9 -53.0 66 -99 SPO 1997 10 19 14 05 -999 -99.9 -9 675.50 -53.6 -52.8 -53.0 66 -99 SPO 1997 10 19 14 06 -999 -99.9 -9 675.50 -53.6 -52.8 -53.0 66 -99 SPO 1997 10 19 14 07 -999 -99.9 -9 675.50 -53.4 -52.8 -52.8 65 -99 SPO 1997 10 19 14 08 -999 -99.9 -9 675.50 -53.4 -52.9 -52.9 65 -99 SPO 1997 10 19 14 09 -999 -99.9 -9 675.50 -53.5 -53.0 -53.0 66 -99 SPO 1997 10 19 14 10 -999 -99.9 -9 675.50 -53.6 -53.1 -53.1 66 -99 SPO 1997 10 19 14 11 -999 -99.9 -9 675.50 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 19 14 12 -999 -99.9 -9 675.50 -53.8 -53.3 -53.2 67 -99 SPO 1997 10 19 14 13 -999 -99.9 -9 675.50 -53.8 -53.3 -53.2 66 -99 SPO 1997 10 19 14 14 -999 -99.9 -9 675.50 -53.8 -53.3 -53.2 66 -99 SPO 1997 10 19 14 15 -999 -99.9 -9 675.50 -53.8 -53.3 -53.3 66 -99 SPO 1997 10 19 14 16 -999 -99.9 -9 675.50 -53.9 -53.3 -53.3 67 -99 SPO 1997 10 19 14 17 -999 -99.9 -9 675.50 -53.8 -53.2 -53.3 65 -99 SPO 1997 10 19 14 18 -999 -99.9 -9 675.50 -53.8 -53.1 -53.3 65 -99 SPO 1997 10 19 14 19 -999 -99.9 -9 675.50 -53.7 -53.1 -53.3 64 -99 SPO 1997 10 19 14 20 -999 -99.9 -9 675.50 -53.7 -53.1 -53.2 64 -99 SPO 1997 10 19 14 21 -999 -99.9 -9 675.40 -53.8 -52.9 -53.2 65 -99 SPO 1997 10 19 14 22 -999 -99.9 -9 675.40 -53.8 -52.9 -53.3 65 -99 SPO 1997 10 19 14 23 -999 -99.9 -9 675.40 -53.8 -52.9 -53.3 64 -99 SPO 1997 10 19 14 24 -999 -99.9 -9 675.40 -53.7 -52.9 -53.3 64 -99 SPO 1997 10 19 14 25 -999 -99.9 -9 675.40 -53.8 -52.9 -53.3 64 -99 SPO 1997 10 19 14 26 -999 -99.9 -9 675.40 -53.8 -52.9 -53.3 64 -99 SPO 1997 10 19 14 27 -999 -99.9 -9 675.40 -53.8 -52.9 -53.3 64 -99 SPO 1997 10 19 14 28 -999 -99.9 -9 675.40 -53.8 -53.0 -53.3 64 -99 SPO 1997 10 19 14 29 -999 -99.9 -9 675.40 -53.8 -53.1 -53.4 64 -99 SPO 1997 10 19 14 30 -999 -99.9 -9 675.40 -53.9 -53.2 -53.4 65 -99 SPO 1997 10 19 14 31 -999 -99.9 -9 675.40 -53.9 -53.2 -53.4 65 -99 SPO 1997 10 19 14 32 -999 -99.9 -9 675.40 -53.9 -53.2 -53.4 65 -99 SPO 1997 10 19 14 33 -999 -99.9 -9 675.40 -54.0 -53.2 -53.4 66 -99 SPO 1997 10 19 14 34 -999 -99.9 -9 675.40 -54.0 -53.2 -53.5 65 -99 SPO 1997 10 19 14 35 -999 -99.9 -9 675.40 -53.9 -53.2 -53.5 63 -99 SPO 1997 10 19 14 36 -999 -99.9 -9 675.40 -53.9 -53.2 -53.5 63 -99 SPO 1997 10 19 14 37 -999 -99.9 -9 675.30 -54.0 -53.2 -53.5 64 -99 SPO 1997 10 19 14 38 -999 -99.9 -9 675.30 -54.0 -53.2 -53.6 64 -99 SPO 1997 10 19 14 39 -999 -99.9 -9 675.30 -53.9 -53.2 -53.5 63 -99 SPO 1997 10 19 14 40 -999 -99.9 -9 675.30 -53.9 -53.2 -53.6 64 -99 SPO 1997 10 19 14 41 -999 -99.9 -9 675.30 -54.0 -53.2 -53.6 65 -99 SPO 1997 10 19 14 42 -999 -99.9 -9 675.30 -54.0 -53.2 -53.6 65 -99 SPO 1997 10 19 14 43 -999 -99.9 -9 675.30 -54.0 -53.3 -53.7 64 -99 SPO 1997 10 19 14 44 -999 -99.9 -9 675.30 -54.0 -53.3 -53.7 64 -99 SPO 1997 10 19 14 45 -999 -99.9 -9 675.30 -54.0 -53.3 -53.7 64 -99 SPO 1997 10 19 14 46 -999 -99.9 -9 675.30 -54.1 -53.3 -53.7 65 -99 SPO 1997 10 19 14 47 -999 -99.9 -9 675.30 -54.1 -53.3 -53.7 65 -99 SPO 1997 10 19 14 48 -999 -99.9 -9 675.30 -54.0 -53.3 -53.7 63 -99 SPO 1997 10 19 14 49 -999 -99.9 -9 675.30 -54.1 -53.3 -53.7 64 -99 SPO 1997 10 19 14 50 -999 -99.9 -9 675.30 -54.1 -53.3 -53.7 63 -99 SPO 1997 10 19 14 51 -999 -99.9 -9 675.20 -54.2 -53.2 -53.7 65 -99 SPO 1997 10 19 14 52 -999 -99.9 -9 675.30 -54.2 -53.2 -53.7 65 -99 SPO 1997 10 19 14 53 -999 -99.9 -9 675.20 -54.1 -53.2 -53.7 64 -99 SPO 1997 10 19 14 54 -999 -99.9 -9 675.20 -54.1 -53.2 -53.7 64 -99 SPO 1997 10 19 14 55 -999 -99.9 -9 675.20 -54.0 -53.0 -53.6 64 -99 SPO 1997 10 19 14 56 -999 -99.9 -9 675.20 -54.0 -53.0 -53.6 64 -99 SPO 1997 10 19 14 57 -999 -99.9 -9 675.10 -54.0 -53.0 -53.6 64 -99 SPO 1997 10 19 14 58 -999 -99.9 -9 675.10 -54.0 -53.0 -53.5 64 -99 SPO 1997 10 19 14 59 -999 -99.9 -9 675.10 -53.9 -53.0 -53.5 63 -99 SPO 1997 10 19 15 00 -999 -99.9 -9 675.10 -53.9 -53.0 -53.5 63 0 SPO 1997 10 19 15 01 -999 -99.9 -9 675.10 -53.9 -52.9 -53.5 63 -99 SPO 1997 10 19 15 02 -999 -99.9 -9 675.10 -53.9 -52.9 -53.5 63 -99 SPO 1997 10 19 15 03 -999 -99.9 -9 675.10 -53.9 -53.0 -53.5 63 -99 SPO 1997 10 19 15 04 -999 -99.9 -9 675.10 -53.9 -53.1 -53.5 64 -99 SPO 1997 10 19 15 05 -999 -99.9 -9 675.10 -54.0 -53.0 -53.5 65 -99 SPO 1997 10 19 15 06 -999 -99.9 -9 675.10 -54.0 -53.0 -53.5 65 -99 SPO 1997 10 19 15 07 -999 -99.9 -9 675.10 -54.0 -53.0 -53.5 64 -99 SPO 1997 10 19 15 08 -999 -99.9 -9 675.10 -54.0 -53.0 -53.6 64 -99 SPO 1997 10 19 15 09 -999 -99.9 -9 675.10 -54.1 -53.1 -53.6 65 -99 SPO 1997 10 19 15 10 -999 -99.9 -9 675.10 -54.2 -53.2 -53.6 66 -99 SPO 1997 10 19 15 11 -999 -99.9 -9 675.10 -54.2 -53.1 -53.7 65 -99 SPO 1997 10 19 15 12 -999 -99.9 -9 675.10 -54.2 -53.1 -53.7 65 -99 SPO 1997 10 19 15 13 -999 -99.9 -9 675.10 -54.3 -53.1 -53.7 63 -99 SPO 1997 10 19 15 14 -999 -99.9 -9 675.00 -54.3 -53.0 -53.7 63 -99 SPO 1997 10 19 15 15 -999 -99.9 -9 675.00 -54.3 -53.0 -53.8 63 -99 SPO 1997 10 19 15 16 -999 -99.9 -9 675.00 -54.3 -53.0 -53.8 63 -99 SPO 1997 10 19 15 17 -999 -99.9 -9 675.00 -54.2 -53.0 -53.8 63 -99 SPO 1997 10 19 15 18 -999 -99.9 -9 675.00 -54.2 -53.1 -53.7 63 -99 SPO 1997 10 19 15 19 -999 -99.9 -9 675.00 -54.3 -53.1 -53.8 63 -99 SPO 1997 10 19 15 20 -999 -99.9 -9 675.00 -54.4 -53.2 -53.9 64 -99 SPO 1997 10 19 15 21 -999 -99.9 -9 675.00 -54.5 -53.4 -54.0 65 -99 SPO 1997 10 19 15 22 -999 -99.9 -9 675.10 -54.6 -53.3 -54.1 65 -99 SPO 1997 10 19 15 23 -999 -99.9 -9 675.10 -54.6 -53.3 -54.1 64 -99 SPO 1997 10 19 15 24 -999 -99.9 -9 675.00 -54.7 -53.3 -54.2 63 -99 SPO 1997 10 19 15 25 -999 -99.9 -9 675.10 -54.6 -53.3 -54.2 62 -99 SPO 1997 10 19 15 26 -999 -99.9 -9 675.10 -54.6 -53.2 -54.2 62 -99 SPO 1997 10 19 15 27 -999 -99.9 -9 675.00 -54.6 -53.3 -54.2 62 -99 SPO 1997 10 19 15 28 -999 -99.9 -9 675.00 -54.7 -53.3 -54.2 62 -99 SPO 1997 10 19 15 29 -999 -99.9 -9 675.00 -54.7 -53.3 -54.2 62 -99 SPO 1997 10 19 15 30 -999 -99.9 -9 675.00 -54.6 -53.3 -54.1 63 -99 SPO 1997 10 19 15 31 -999 -99.9 -9 675.00 -54.6 -53.3 -54.1 63 -99 SPO 1997 10 19 15 32 -999 -99.9 -9 675.00 -54.4 -53.2 -54.0 62 -99 SPO 1997 10 19 15 33 -999 -99.9 -9 675.00 -54.5 -53.3 -54.0 63 -99 SPO 1997 10 19 15 34 -999 -99.9 -9 675.00 -54.5 -53.4 -54.0 63 -99 SPO 1997 10 19 15 35 -999 -99.9 -9 675.00 -54.5 -53.4 -54.1 63 -99 SPO 1997 10 19 15 36 -999 -99.9 -9 674.90 -54.5 -53.2 -54.1 63 -99 SPO 1997 10 19 15 37 -999 -99.9 -9 674.90 -54.6 -53.2 -54.1 63 -99 SPO 1997 10 19 15 38 -999 -99.9 -9 674.90 -54.5 -53.3 -54.0 62 -99 SPO 1997 10 19 15 39 -999 -99.9 -9 674.90 -54.4 -53.2 -54.0 62 -99 SPO 1997 10 19 15 40 -999 -99.9 -9 674.90 -54.4 -53.1 -53.9 63 -99 SPO 1997 10 19 15 41 -999 -99.9 -9 674.90 -54.4 -53.1 -53.9 63 -99 SPO 1997 10 19 15 42 -999 -99.9 -9 674.90 -54.3 -53.0 -53.9 63 -99 SPO 1997 10 19 15 43 -999 -99.9 -9 674.90 -54.3 -53.0 -53.9 63 -99 SPO 1997 10 19 15 44 -999 -99.9 -9 674.90 -54.3 -53.0 -53.9 65 -99 SPO 1997 10 19 15 45 -999 -99.9 -9 674.90 -54.3 -53.0 -53.8 65 -99 SPO 1997 10 19 15 46 -999 -99.9 -9 674.90 -54.3 -53.0 -53.8 65 -99 SPO 1997 10 19 15 47 -999 -99.9 -9 674.80 -54.2 -52.8 -53.8 64 -99 SPO 1997 10 19 15 48 -999 -99.9 -9 674.90 -54.2 -52.7 -53.7 63 -99 SPO 1997 10 19 15 49 -999 -99.9 -9 674.90 -54.1 -52.7 -53.6 62 -99 SPO 1997 10 19 15 50 -999 -99.9 -9 674.90 -54.0 -52.7 -53.6 63 -99 SPO 1997 10 19 15 51 -999 -99.9 -9 674.90 -54.0 -52.8 -53.6 63 -99 SPO 1997 10 19 15 52 -999 -99.9 -9 674.90 -54.1 -53.0 -53.6 63 -99 SPO 1997 10 19 15 53 -999 -99.9 -9 674.90 -54.2 -53.0 -53.6 65 -99 SPO 1997 10 19 15 54 -999 -99.9 -9 674.90 -54.3 -53.1 -53.6 66 -99 SPO 1997 10 19 15 55 -999 -99.9 -9 674.80 -54.4 -53.1 -53.7 67 -99 SPO 1997 10 19 15 56 -999 -99.9 -9 674.90 -54.4 -53.1 -53.8 66 -99 SPO 1997 10 19 15 57 -999 -99.9 -9 674.80 -54.6 -53.1 -53.8 66 -99 SPO 1997 10 19 15 58 -999 -99.9 -9 674.80 -54.5 -53.1 -53.8 64 -99 SPO 1997 10 19 15 59 -999 -99.9 -9 674.80 -54.5 -53.0 -53.7 64 -99 SPO 1997 10 19 16 00 -999 -99.9 -9 674.80 -54.4 -52.9 -53.7 63 0 SPO 1997 10 19 16 01 -999 -99.9 -9 674.80 -54.2 -52.8 -53.6 61 -99 SPO 1997 10 19 16 02 -999 -99.9 -9 674.80 -54.2 -52.8 -53.5 61 -99 SPO 1997 10 19 16 03 -999 -99.9 -9 674.80 -54.2 -52.8 -53.4 62 -99 SPO 1997 10 19 16 04 -999 -99.9 -9 674.90 -54.1 -52.8 -53.4 61 -99 SPO 1997 10 19 16 05 -999 -99.9 -9 674.80 -54.1 -52.7 -53.3 62 -99 SPO 1997 10 19 16 06 -999 -99.9 -9 674.90 -54.2 -52.8 -53.3 63 -99 SPO 1997 10 19 16 07 -999 -99.9 -9 674.80 -54.1 -52.8 -53.3 63 -99 SPO 1997 10 19 16 08 -999 -99.9 -9 674.90 -54.1 -52.8 -53.3 63 -99 SPO 1997 10 19 16 09 -999 -99.9 -9 674.80 -54.1 -52.8 -53.3 63 -99 SPO 1997 10 19 16 10 -999 -99.9 -9 674.80 -54.2 -52.8 -53.3 64 -99 SPO 1997 10 19 16 11 -999 -99.9 -9 674.80 -54.2 -52.8 -53.2 64 -99 SPO 1997 10 19 16 12 -999 -99.9 -9 674.80 -54.3 -52.8 -53.3 65 -99 SPO 1997 10 19 16 13 -999 -99.9 -9 674.80 -54.3 -52.8 -53.3 65 -99 SPO 1997 10 19 16 14 -999 -99.9 -9 674.80 -54.4 -52.8 -53.3 64 -99 SPO 1997 10 19 16 15 -999 -99.9 -9 674.80 -54.4 -52.9 -53.3 63 -99 SPO 1997 10 19 16 16 -999 -99.9 -9 674.80 -54.4 -52.9 -53.4 63 -99 SPO 1997 10 19 16 17 -999 -99.9 -9 674.80 -54.5 -52.9 -53.4 63 -99 SPO 1997 10 19 16 18 -999 -99.9 -9 674.80 -54.6 -52.8 -53.5 64 -99 SPO 1997 10 19 16 19 -999 -99.9 -9 674.80 -54.6 -52.8 -53.5 63 -99 SPO 1997 10 19 16 20 -999 -99.9 -9 674.80 -54.7 -52.8 -53.6 64 -99 SPO 1997 10 19 16 21 -999 -99.9 -9 674.80 -54.8 -52.8 -53.6 65 -99 SPO 1997 10 19 16 22 -999 -99.9 -9 674.80 -54.6 -52.7 -53.5 63 -99 SPO 1997 10 19 16 23 -999 -99.9 -9 674.80 -54.4 -52.8 -53.4 63 -99 SPO 1997 10 19 16 24 -999 -99.9 -9 674.80 -54.4 -52.8 -53.4 63 -99 SPO 1997 10 19 16 25 -999 -99.9 -9 674.80 -54.4 -52.8 -53.5 63 -99 SPO 1997 10 19 16 26 -999 -99.9 -9 674.70 -54.5 -52.9 -53.5 63 -99 SPO 1997 10 19 16 27 -999 -99.9 -9 674.70 -54.6 -52.9 -53.6 63 -99 SPO 1997 10 19 16 28 -999 -99.9 -9 674.70 -54.7 -52.9 -53.6 63 -99 SPO 1997 10 19 16 29 -999 -99.9 -9 674.70 -54.7 -53.0 -53.6 63 -99 SPO 1997 10 19 16 30 -999 -99.9 -9 674.70 -54.7 -53.0 -53.6 63 -99 SPO 1997 10 19 16 31 -999 -99.9 -9 674.70 -54.7 -53.0 -53.6 63 -99 SPO 1997 10 19 16 32 -999 -99.9 -9 674.70 -54.8 -53.1 -53.6 65 -99 SPO 1997 10 19 16 33 -999 -99.9 -9 674.70 -54.8 -53.1 -53.6 65 -99 SPO 1997 10 19 16 34 -999 -99.9 -9 674.70 -54.8 -53.1 -53.6 65 -99 SPO 1997 10 19 16 35 -999 -99.9 -9 674.70 -54.8 -53.1 -53.6 65 -99 SPO 1997 10 19 16 36 -999 -99.9 -9 674.70 -54.7 -53.0 -53.6 64 -99 SPO 1997 10 19 16 37 -999 -99.9 -9 674.80 -54.6 -53.0 -53.6 63 -99 SPO 1997 10 19 16 38 -999 -99.9 -9 674.70 -54.6 -53.1 -53.6 63 -99 SPO 1997 10 19 16 39 -999 -99.9 -9 674.80 -54.6 -53.0 -53.6 63 -99 SPO 1997 10 19 16 40 -999 -99.9 -9 674.80 -54.6 -53.0 -53.5 63 -99 SPO 1997 10 19 16 41 -999 -99.9 -9 674.70 -54.6 -52.9 -53.6 63 -99 SPO 1997 10 19 16 42 -999 -99.9 -9 674.70 -54.5 -52.8 -53.6 63 -99 SPO 1997 10 19 16 43 -999 -99.9 -9 674.80 -54.5 -52.8 -53.5 63 -99 SPO 1997 10 19 16 44 -999 -99.9 -9 674.80 -54.5 -52.8 -53.5 63 -99 SPO 1997 10 19 16 45 -999 -99.9 -9 674.70 -54.5 -52.9 -53.5 63 -99 SPO 1997 10 19 16 46 -999 -99.9 -9 674.70 -54.5 -52.8 -53.5 63 -99 SPO 1997 10 19 16 47 -999 -99.9 -9 674.70 -54.5 -52.8 -53.5 64 -99 SPO 1997 10 19 16 48 -999 -99.9 -9 674.70 -54.4 -52.8 -53.5 64 -99 SPO 1997 10 19 16 49 -999 -99.9 -9 674.80 -54.5 -52.9 -53.6 65 -99 SPO 1997 10 19 16 50 -999 -99.9 -9 674.80 -54.5 -52.9 -53.6 65 -99 SPO 1997 10 19 16 51 -999 -99.9 -9 674.80 -54.6 -52.9 -53.6 67 -99 SPO 1997 10 19 16 52 -999 -99.9 -9 674.70 -54.6 -53.0 -53.6 66 -99 SPO 1997 10 19 16 53 -999 -99.9 -9 674.70 -54.5 -53.0 -53.6 65 -99 SPO 1997 10 19 16 54 -999 -99.9 -9 674.70 -54.6 -53.1 -53.6 65 -99 SPO 1997 10 19 16 55 -999 -99.9 -9 674.80 -54.6 -53.1 -53.6 65 -99 SPO 1997 10 19 16 56 -999 -99.9 -9 674.80 -54.7 -53.1 -53.7 65 -99 SPO 1997 10 19 16 57 -999 -99.9 -9 674.80 -54.7 -53.2 -53.7 65 -99 SPO 1997 10 19 16 58 -999 -99.9 -9 674.80 -54.8 -53.2 -53.7 66 -99 SPO 1997 10 19 16 59 -999 -99.9 -9 674.80 -54.8 -53.0 -53.7 66 -99 SPO 1997 10 19 17 00 -999 -99.9 -9 674.70 -54.8 -53.0 -53.7 65 0 SPO 1997 10 19 17 01 -999 -99.9 -9 674.70 -54.6 -53.0 -53.6 63 -99 SPO 1997 10 19 17 02 -999 -99.9 -9 674.80 -54.6 -53.1 -53.6 63 -99 SPO 1997 10 19 17 03 -999 -99.9 -9 674.80 -54.6 -53.1 -53.6 63 -99 SPO 1997 10 19 17 04 -999 -99.9 -9 674.80 -54.6 -53.0 -53.6 64 -99 SPO 1997 10 19 17 05 -999 -99.9 -9 674.80 -54.6 -53.0 -53.6 64 -99 SPO 1997 10 19 17 06 -999 -99.9 -9 674.70 -54.7 -53.0 -53.7 64 -99 SPO 1997 10 19 17 07 -999 -99.9 -9 674.70 -54.8 -53.0 -53.7 64 -99 SPO 1997 10 19 17 08 -999 -99.9 -9 674.70 -54.9 -53.1 -53.8 65 -99 SPO 1997 10 19 17 09 -999 -99.9 -9 674.70 -54.9 -53.1 -53.8 65 -99 SPO 1997 10 19 17 10 -999 -99.9 -9 674.70 -55.0 -53.2 -53.8 66 -99 SPO 1997 10 19 17 11 -999 -99.9 -9 674.70 -55.0 -53.2 -53.9 66 -99 SPO 1997 10 19 17 12 -999 -99.9 -9 674.80 -55.0 -53.2 -53.8 65 -99 SPO 1997 10 19 17 13 -999 -99.9 -9 674.70 -55.1 -53.2 -53.9 66 -99 SPO 1997 10 19 17 14 -999 -99.9 -9 674.70 -55.1 -53.2 -53.9 66 -99 SPO 1997 10 19 17 15 -999 -99.9 -9 674.70 -55.1 -53.3 -53.9 66 -99 SPO 1997 10 19 17 16 -999 -99.9 -9 674.70 -55.2 -53.3 -54.0 66 -99 SPO 1997 10 19 17 17 -999 -99.9 -9 674.70 -55.2 -53.2 -54.0 66 -99 SPO 1997 10 19 17 18 -999 -99.9 -9 674.70 -55.1 -53.2 -54.0 65 -99 SPO 1997 10 19 17 19 -999 -99.9 -9 674.70 -55.2 -53.3 -54.0 66 -99 SPO 1997 10 19 17 20 -999 -99.9 -9 674.70 -55.3 -53.3 -54.0 65 -99 SPO 1997 10 19 17 21 -999 -99.9 -9 674.70 -55.4 -53.2 -54.1 65 -99 SPO 1997 10 19 17 22 -999 -99.9 -9 674.70 -55.3 -53.0 -54.1 64 -99 SPO 1997 10 19 17 23 -999 -99.9 -9 674.70 -55.2 -53.1 -54.1 64 -99 SPO 1997 10 19 17 24 -999 -99.9 -9 674.70 -55.3 -53.3 -54.2 64 -99 SPO 1997 10 19 17 25 -999 -99.9 -9 674.70 -55.3 -53.3 -54.2 64 -99 SPO 1997 10 19 17 26 -999 -99.9 -9 674.60 -55.2 -53.3 -54.2 64 -99 SPO 1997 10 19 17 27 -999 -99.9 -9 674.60 -55.2 -53.1 -54.1 64 -99 SPO 1997 10 19 17 28 -999 -99.9 -9 674.70 -55.2 -53.0 -54.1 65 -99 SPO 1997 10 19 17 29 -999 -99.9 -9 674.70 -55.2 -53.2 -54.2 66 -99 SPO 1997 10 19 17 30 -999 -99.9 -9 674.70 -55.2 -53.3 -54.2 66 -99 SPO 1997 10 19 17 31 -999 -99.9 -9 674.60 -55.3 -53.3 -54.2 66 -99 SPO 1997 10 19 17 32 -999 -99.9 -9 674.60 -55.3 -53.2 -54.2 66 -99 SPO 1997 10 19 17 33 -999 -99.9 -9 674.70 -55.3 -53.2 -54.3 65 -99 SPO 1997 10 19 17 34 -999 -99.9 -9 674.60 -55.4 -53.2 -54.3 66 -99 SPO 1997 10 19 17 35 -999 -99.9 -9 674.60 -55.4 -53.0 -54.3 66 -99 SPO 1997 10 19 17 36 -999 -99.9 -9 674.60 -55.3 -53.0 -54.3 66 -99 SPO 1997 10 19 17 37 -999 -99.9 -9 674.60 -55.3 -52.8 -54.2 66 -99 SPO 1997 10 19 17 38 -999 -99.9 -9 674.60 -55.2 -52.8 -54.2 66 -99 SPO 1997 10 19 17 39 -999 -99.9 -9 674.60 -55.1 -53.0 -54.1 66 -99 SPO 1997 10 19 17 40 -999 -99.9 -9 674.60 -55.0 -53.0 -54.1 65 -99 SPO 1997 10 19 17 41 -999 -99.9 -9 674.60 -55.1 -53.0 -54.1 66 -99 SPO 1997 10 19 17 42 -999 -99.9 -9 674.60 -55.1 -53.0 -54.1 66 -99 SPO 1997 10 19 17 43 -999 -99.9 -9 674.60 -55.2 -53.1 -54.2 67 -99 SPO 1997 10 19 17 44 -999 -99.9 -9 674.60 -55.2 -53.1 -54.2 66 -99 SPO 1997 10 19 17 45 -999 -99.9 -9 674.60 -55.1 -53.1 -54.1 66 -99 SPO 1997 10 19 17 46 -999 -99.9 -9 674.60 -55.1 -53.2 -54.1 66 -99 SPO 1997 10 19 17 47 -999 -99.9 -9 674.60 -55.1 -53.1 -54.1 66 -99 SPO 1997 10 19 17 48 -999 -99.9 -9 674.60 -55.0 -53.1 -54.0 65 -99 SPO 1997 10 19 17 49 -999 -99.9 -9 674.60 -55.0 -53.2 -54.0 66 -99 SPO 1997 10 19 17 50 -999 -99.9 -9 674.60 -55.0 -53.2 -54.0 66 -99 SPO 1997 10 19 17 51 -999 -99.9 -9 674.60 -55.0 -53.1 -54.0 66 -99 SPO 1997 10 19 17 52 -999 -99.9 -9 674.60 -55.0 -53.1 -54.0 67 -99 SPO 1997 10 19 17 53 -999 -99.9 -9 674.60 -55.0 -53.1 -54.0 67 -99 SPO 1997 10 19 17 54 -999 -99.9 -9 674.60 -55.0 -53.1 -54.0 67 -99 SPO 1997 10 19 17 55 -999 -99.9 -9 674.60 -55.0 -53.0 -54.0 66 -99 SPO 1997 10 19 17 56 -999 -99.9 -9 674.60 -54.9 -53.0 -54.0 65 -99 SPO 1997 10 19 17 57 -999 -99.9 -9 674.60 -54.9 -53.0 -54.0 65 -99 SPO 1997 10 19 17 58 -999 -99.9 -9 674.60 -54.8 -52.9 -54.0 63 -99 SPO 1997 10 19 17 59 -999 -99.9 -9 674.60 -54.8 -52.9 -54.0 63 -99 SPO 1997 10 19 18 00 -999 -99.9 -9 674.60 -54.9 -52.9 -54.0 64 0 SPO 1997 10 19 18 01 -999 -99.9 -9 674.50 -54.9 -52.9 -54.0 64 -99 SPO 1997 10 19 18 02 -999 -99.9 -9 674.60 -54.9 -52.9 -54.0 65 -99 SPO 1997 10 19 18 03 -999 -99.9 -9 674.50 -54.9 -52.9 -54.1 65 -99 SPO 1997 10 19 18 04 -999 -99.9 -9 674.50 -54.8 -53.0 -54.1 65 -99 SPO 1997 10 19 18 05 -999 -99.9 -9 674.50 -54.8 -52.9 -54.1 65 -99 SPO 1997 10 19 18 06 -999 -99.9 -9 674.50 -54.8 -52.8 -54.0 66 -99 SPO 1997 10 19 18 07 -999 -99.9 -9 674.50 -54.8 -52.8 -54.1 66 -99 SPO 1997 10 19 18 08 -999 -99.9 -9 674.50 -54.8 -52.8 -54.1 65 -99 SPO 1997 10 19 18 09 -999 -99.9 -9 674.50 -54.8 -52.8 -54.1 65 -99 SPO 1997 10 19 18 10 -999 -99.9 -9 674.50 -54.8 -52.8 -54.1 65 -99 SPO 1997 10 19 18 11 -999 -99.9 -9 674.50 -54.7 -52.8 -54.0 64 -99 SPO 1997 10 19 18 12 -999 -99.9 -9 674.50 -54.7 -52.8 -54.0 64 -99 SPO 1997 10 19 18 13 -999 -99.9 -9 674.50 -54.6 -52.7 -54.0 64 -99 SPO 1997 10 19 18 14 -999 -99.9 -9 674.60 -54.6 -52.7 -53.9 64 -99 SPO 1997 10 19 18 15 -999 -99.9 -9 674.60 -54.6 -52.7 -53.9 65 -99 SPO 1997 10 19 18 16 -999 -99.9 -9 674.50 -54.6 -52.7 -53.9 66 -99 SPO 1997 10 19 18 17 -999 -99.9 -9 674.50 -54.5 -52.7 -53.9 65 -99 SPO 1997 10 19 18 18 -999 -99.9 -9 674.50 -54.5 -52.6 -53.9 65 -99 SPO 1997 10 19 18 19 -999 -99.9 -9 674.50 -54.5 -52.6 -53.8 65 -99 SPO 1997 10 19 18 20 -999 -99.9 -9 674.60 -54.5 -52.7 -53.8 65 -99 SPO 1997 10 19 18 21 -999 -99.9 -9 674.60 -54.5 -52.8 -53.8 65 -99 SPO 1997 10 19 18 22 -999 -99.9 -9 674.50 -54.4 -52.8 -53.8 64 -99 SPO 1997 10 19 18 23 -999 -99.9 -9 674.50 -54.4 -52.8 -53.8 64 -99 SPO 1997 10 19 18 24 -999 -99.9 -9 674.50 -54.4 -52.7 -53.7 64 -99 SPO 1997 10 19 18 25 -999 -99.9 -9 674.50 -54.4 -52.7 -53.7 66 -99 SPO 1997 10 19 18 26 -999 -99.9 -9 674.50 -54.3 -52.7 -53.7 66 -99 SPO 1997 10 19 18 27 -999 -99.9 -9 674.50 -54.3 -52.6 -53.7 66 -99 SPO 1997 10 19 18 28 -999 -99.9 -9 674.50 -54.3 -52.6 -53.7 67 -99 SPO 1997 10 19 18 29 -999 -99.9 -9 674.50 -54.3 -52.5 -53.6 67 -99 SPO 1997 10 19 18 30 -999 -99.9 -9 674.50 -54.2 -52.4 -53.6 66 -99 SPO 1997 10 19 18 31 -999 -99.9 -9 674.40 -54.2 -52.5 -53.6 67 -99 SPO 1997 10 19 18 32 -999 -99.9 -9 674.40 -54.1 -52.5 -53.5 66 -99 SPO 1997 10 19 18 33 -999 -99.9 -9 674.40 -54.1 -52.5 -53.5 66 -99 SPO 1997 10 19 18 34 -999 -99.9 -9 674.40 -54.1 -52.5 -53.5 66 -99 SPO 1997 10 19 18 35 -999 -99.9 -9 674.40 -54.1 -52.5 -53.5 66 -99 SPO 1997 10 19 18 36 -999 -99.9 -9 674.40 -54.0 -52.5 -53.5 66 -99 SPO 1997 10 19 18 37 -999 -99.9 -9 674.40 -54.0 -52.5 -53.5 66 -99 SPO 1997 10 19 18 38 -999 -99.9 -9 674.40 -54.0 -52.5 -53.5 66 -99 SPO 1997 10 19 18 39 -999 -99.9 -9 674.40 -54.1 -52.6 -53.4 67 -99 SPO 1997 10 19 18 40 -999 -99.9 -9 674.40 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 41 -999 -99.9 -9 674.40 -54.1 -52.7 -53.5 68 -99 SPO 1997 10 19 18 42 -999 -99.9 -9 674.40 -54.1 -52.7 -53.5 68 -99 SPO 1997 10 19 18 43 -999 -99.9 -9 674.40 -54.1 -52.8 -53.5 68 -99 SPO 1997 10 19 18 44 -999 -99.9 -9 674.40 -54.1 -52.8 -53.5 68 -99 SPO 1997 10 19 18 45 -999 -99.9 -9 674.40 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 46 -999 -99.9 -9 674.30 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 47 -999 -99.9 -9 674.30 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 48 -999 -99.9 -9 674.30 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 49 -999 -99.9 -9 674.30 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 50 -999 -99.9 -9 674.40 -54.1 -52.7 -53.5 67 -99 SPO 1997 10 19 18 51 -999 -99.9 -9 674.30 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 52 -999 -99.9 -9 674.30 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 53 -999 -99.9 -9 674.40 -54.0 -52.6 -53.5 67 -99 SPO 1997 10 19 18 54 -999 -99.9 -9 674.40 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 55 -999 -99.9 -9 674.40 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 56 -999 -99.9 -9 674.40 -54.0 -52.6 -53.4 67 -99 SPO 1997 10 19 18 57 -999 -99.9 -9 674.40 -54.0 -52.7 -53.4 67 -99 SPO 1997 10 19 18 58 -999 -99.9 -9 674.40 -54.0 -52.8 -53.4 67 -99 SPO 1997 10 19 18 59 -999 -99.9 -9 674.40 -54.0 -52.8 -53.4 66 -99 SPO 1997 10 19 19 00 -999 -99.9 -9 674.40 -54.0 -52.8 -53.4 66 0 SPO 1997 10 19 19 01 -999 -99.9 -9 674.40 -54.0 -52.9 -53.4 66 -99 SPO 1997 10 19 19 02 -999 -99.9 -9 674.40 -54.1 -52.9 -53.4 67 -99 SPO 1997 10 19 19 03 -999 -99.9 -9 674.40 -54.0 -52.9 -53.4 67 -99 SPO 1997 10 19 19 04 -999 -99.9 -9 674.40 -54.1 -52.9 -53.4 67 -99 SPO 1997 10 19 19 05 -999 -99.9 -9 674.40 -54.0 -52.9 -53.3 66 -99 SPO 1997 10 19 19 06 -999 -99.9 -9 674.40 -54.0 -52.8 -53.3 67 -99 SPO 1997 10 19 19 07 -999 -99.9 -9 674.40 -54.1 -52.8 -53.3 67 -99 SPO 1997 10 19 19 08 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 67 -99 SPO 1997 10 19 19 09 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 66 -99 SPO 1997 10 19 19 10 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 66 -99 SPO 1997 10 19 19 11 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 66 -99 SPO 1997 10 19 19 12 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 66 -99 SPO 1997 10 19 19 13 -999 -99.9 -9 674.40 -54.0 -52.8 -53.2 65 -99 SPO 1997 10 19 19 14 -999 -99.9 -9 674.40 -54.0 -52.9 -53.2 65 -99 SPO 1997 10 19 19 15 -999 -99.9 -9 674.40 -54.1 -53.0 -53.2 66 -99 SPO 1997 10 19 19 16 -999 -99.9 -9 674.40 -54.3 -53.0 -53.3 67 -99 SPO 1997 10 19 19 17 -999 -99.9 -9 674.40 -54.3 -53.0 -53.3 67 -99 SPO 1997 10 19 19 18 -999 -99.9 -9 674.40 -54.4 -53.1 -53.3 68 -99 SPO 1997 10 19 19 19 -999 -99.9 -9 674.40 -54.4 -53.2 -53.4 68 -99 SPO 1997 10 19 19 20 -999 -99.9 -9 674.40 -54.6 -53.3 -53.4 69 -99 SPO 1997 10 19 19 21 -999 -99.9 -9 674.40 -55.2 -53.2 -53.6 72 -99 SPO 1997 10 19 19 22 -999 -99.9 -9 674.40 -55.9 -53.2 -53.8 73 -99 SPO 1997 10 19 19 23 -999 -99.9 -9 674.30 -55.5 -53.2 -53.9 66 -99 SPO 1997 10 19 19 24 -999 -99.9 -9 674.30 -54.8 -53.1 -53.7 60 -99 SPO 1997 10 19 19 25 -999 -99.9 -9 674.30 -54.7 -53.1 -53.7 60 -99 SPO 1997 10 19 19 26 -999 -99.9 -9 674.30 -54.7 -53.1 -53.7 62 -99 SPO 1997 10 19 19 27 -999 -99.9 -9 674.20 -54.6 -53.0 -53.6 63 -99 SPO 1997 10 19 19 28 -999 -99.9 -9 674.20 -54.5 -53.0 -53.6 63 -99 SPO 1997 10 19 19 29 -999 -99.9 -9 674.20 -54.4 -53.0 -53.6 63 -99 SPO 1997 10 19 19 30 -999 -99.9 -9 674.20 -54.3 -53.0 -53.6 63 -99 SPO 1997 10 19 19 31 -999 -99.9 -9 674.20 -54.3 -53.0 -53.5 63 -99 SPO 1997 10 19 19 32 -999 -99.9 -9 674.10 -54.2 -53.0 -53.5 64 -99 SPO 1997 10 19 19 33 -999 -99.9 -9 674.10 -54.2 -53.0 -53.5 65 -99 SPO 1997 10 19 19 34 -999 -99.9 -9 674.10 -54.2 -53.1 -53.4 65 -99 SPO 1997 10 19 19 35 -999 -99.9 -9 674.10 -54.3 -53.1 -53.5 67 -99 SPO 1997 10 19 19 36 -999 -99.9 -9 674.10 -54.3 -53.0 -53.5 67 -99 SPO 1997 10 19 19 37 -999 -99.9 -9 674.10 -54.3 -53.0 -53.5 66 -99 SPO 1997 10 19 19 38 -999 -99.9 -9 674.10 -54.4 -53.0 -53.5 67 -99 SPO 1997 10 19 19 39 -999 -99.9 -9 674.10 -54.3 -53.0 -53.5 66 -99 SPO 1997 10 19 19 40 -999 -99.9 -9 674.10 -54.3 -53.0 -53.5 66 -99 SPO 1997 10 19 19 41 -999 -99.9 -9 674.10 -54.3 -53.0 -53.5 67 -99 SPO 1997 10 19 19 42 -999 -99.9 -9 674.10 -54.3 -53.0 -53.4 67 -99 SPO 1997 10 19 19 43 -999 -99.9 -9 674.10 -54.3 -53.0 -53.4 67 -99 SPO 1997 10 19 19 44 -999 -99.9 -9 674.10 -54.3 -53.0 -53.4 67 -99 SPO 1997 10 19 19 45 -999 -99.9 -9 674.10 -54.3 -53.1 -53.4 67 -99 SPO 1997 10 19 19 46 -999 -99.9 -9 674.10 -54.3 -53.1 -53.4 67 -99 SPO 1997 10 19 19 47 -999 -99.9 -9 674.10 -54.4 -53.1 -53.4 67 -99 SPO 1997 10 19 19 48 -999 -99.9 -9 674.10 -54.4 -53.1 -53.5 67 -99 SPO 1997 10 19 19 49 -999 -99.9 -9 674.10 -54.4 -53.2 -53.5 66 -99 SPO 1997 10 19 19 50 -999 -99.9 -9 674.10 -54.4 -53.1 -53.5 64 -99 SPO 1997 10 19 19 51 -999 -99.9 -9 674.10 -54.4 -53.2 -53.5 66 -99 SPO 1997 10 19 19 52 -999 -99.9 -9 674.10 -54.4 -53.2 -53.5 66 -99 SPO 1997 10 19 19 53 -999 -99.9 -9 674.10 -54.4 -53.2 -53.5 66 -99 SPO 1997 10 19 19 54 -999 -99.9 -9 674.10 -54.6 -53.3 -53.6 67 -99 SPO 1997 10 19 19 55 -999 -99.9 -9 674.10 -54.7 -53.4 -53.6 68 -99 SPO 1997 10 19 19 56 -999 -99.9 -9 674.10 -54.9 -53.5 -53.7 68 -99 SPO 1997 10 19 19 57 -999 -99.9 -9 674.10 -55.0 -53.4 -53.8 69 -99 SPO 1997 10 19 19 58 -999 -99.9 -9 674.10 -55.0 -53.4 -53.8 67 -99 SPO 1997 10 19 19 59 -999 -99.9 -9 674.10 -55.0 -53.4 -53.8 66 -99 SPO 1997 10 19 20 00 -999 -99.9 -9 674.10 -54.8 -53.3 -53.8 65 0 SPO 1997 10 19 20 01 -999 -99.9 -9 674.10 -54.7 -53.2 -53.7 64 -99 SPO 1997 10 19 20 02 -999 -99.9 -9 674.10 -54.6 -53.2 -53.7 63 -99 SPO 1997 10 19 20 03 -999 -99.9 -9 674.10 -54.6 -53.1 -53.7 64 -99 SPO 1997 10 19 20 04 -999 -99.9 -9 674.10 -54.6 -53.1 -53.7 65 -99 SPO 1997 10 19 20 05 -999 -99.9 -9 674.10 -54.7 -53.0 -53.7 66 -99 SPO 1997 10 19 20 06 -999 -99.9 -9 674.10 -54.6 -53.1 -53.7 66 -99 SPO 1997 10 19 20 07 -999 -99.9 -9 674.10 -54.6 -53.1 -53.7 66 -99 SPO 1997 10 19 20 08 -999 -99.9 -9 674.10 -54.5 -53.1 -53.7 66 -99 SPO 1997 10 19 20 09 -999 -99.9 -9 674.10 -54.5 -53.1 -53.6 66 -99 SPO 1997 10 19 20 10 -999 -99.9 -9 674.10 -54.6 -53.1 -53.7 66 -99 SPO 1997 10 19 20 11 -999 -99.9 -9 674.10 -54.6 -53.2 -53.7 66 -99 SPO 1997 10 19 20 12 -999 -99.9 -9 674.10 -54.7 -53.2 -53.7 66 -99 SPO 1997 10 19 20 13 -999 -99.9 -9 674.10 -54.8 -53.3 -53.7 66 -99 SPO 1997 10 19 20 14 -999 -99.9 -9 674.10 -55.0 -53.4 -53.6 67 -99 SPO 1997 10 19 20 15 -999 -99.9 -9 674.10 -55.2 -53.4 -53.6 68 -99 SPO 1997 10 19 20 16 -999 -99.9 -9 674.10 -55.4 -53.4 -53.6 69 -99 SPO 1997 10 19 20 17 -999 -99.9 -9 674.10 -55.8 -53.4 -53.6 70 -99 SPO 1997 10 19 20 18 -999 -99.9 -9 674.10 -55.9 -53.4 -53.8 69 -99 SPO 1997 10 19 20 19 -999 -99.9 -9 674.10 -55.9 -53.3 -53.9 69 -99 SPO 1997 10 19 20 20 -999 -99.9 -9 674.10 -56.0 -53.4 -54.0 69 -99 SPO 1997 10 19 20 21 -999 -99.9 -9 674.10 -56.1 -53.4 -54.1 69 -99 SPO 1997 10 19 20 22 -999 -99.9 -9 674.10 -56.1 -53.4 -54.2 68 -99 SPO 1997 10 19 20 23 -999 -99.9 -9 674.10 -56.1 -53.4 -54.2 68 -99 SPO 1997 10 19 20 24 -999 -99.9 -9 674.10 -56.2 -53.3 -54.2 68 -99 SPO 1997 10 19 20 25 -999 -99.9 -9 674.10 -56.2 -53.3 -54.2 67 -99 SPO 1997 10 19 20 26 -999 -99.9 -9 674.10 -56.4 -53.4 -54.3 68 -99 SPO 1997 10 19 20 27 -999 -99.9 -9 674.10 -56.4 -53.4 -54.3 67 -99 SPO 1997 10 19 20 28 -999 -99.9 -9 674.10 -56.4 -53.6 -54.4 65 -99 SPO 1997 10 19 20 29 -999 -99.9 -9 674.10 -56.4 -53.8 -54.5 65 -99 SPO 1997 10 19 20 30 -999 -99.9 -9 674.10 -56.3 -54.0 -54.5 -99 -99 SPO 1997 10 19 20 31 -999 -99.9 -9 674.10 -56.2 -53.9 -54.6 -99 -99 SPO 1997 10 19 20 32 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 19 20 33 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 19 20 34 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 19 20 35 57 -99.9 -9 674.00 -56.1 -53.3 -54.7 -99 -99 SPO 1997 10 19 20 36 56 -99.9 -9 674.00 -56.1 -53.3 -54.8 -99 -99 SPO 1997 10 19 20 37 57 -99.9 -9 674.00 -56.0 -53.3 -54.8 67 -99 SPO 1997 10 19 20 38 58 -99.9 -9 674.00 -55.9 -53.3 -54.8 66 -99 SPO 1997 10 19 20 39 61 -99.9 -9 674.00 -55.9 -53.3 -54.7 66 -99 SPO 1997 10 19 20 40 65 -99.9 -9 674.00 -55.9 -53.3 -54.6 67 -99 SPO 1997 10 19 20 41 68 -99.9 -9 674.00 -56.0 -53.4 -54.4 67 -99 SPO 1997 10 19 20 42 72 -99.9 -9 674.00 -56.2 -53.5 -54.4 69 -99 SPO 1997 10 19 20 43 72 -99.9 -9 674.00 -56.2 -53.6 -54.5 68 -99 SPO 1997 10 19 20 44 71 -99.9 -9 674.00 -56.2 -53.6 -54.5 68 -99 SPO 1997 10 19 20 45 69 -99.9 -9 674.00 -56.2 -53.7 -54.5 69 -99 SPO 1997 10 19 20 46 70 3.1 -9 674.00 -56.2 -53.6 -54.5 69 -99 SPO 1997 10 19 20 47 74 2.8 -9 674.00 -56.3 -53.6 -54.5 69 -99 SPO 1997 10 19 20 48 76 2.6 -9 674.00 -56.5 -53.7 -54.6 69 -99 SPO 1997 10 19 20 49 78 2.7 -9 674.00 -56.6 -53.9 -54.7 70 -99 SPO 1997 10 19 20 50 77 3.0 -9 674.00 -56.6 -54.1 -54.8 69 -99 SPO 1997 10 19 20 51 73 3.1 -9 673.90 -56.7 -54.0 -54.9 69 -99 SPO 1997 10 19 20 52 70 3.2 -9 673.90 -56.7 -53.9 -54.9 69 -99 SPO 1997 10 19 20 53 68 3.3 -9 673.90 -56.7 -53.7 -55.0 68 -99 SPO 1997 10 19 20 54 68 3.3 -9 674.00 -56.7 -53.6 -55.1 67 -99 SPO 1997 10 19 20 55 66 3.3 -9 673.90 -56.8 -53.6 -55.1 67 -99 SPO 1997 10 19 20 56 66 3.3 -9 673.80 -56.8 -53.6 -55.1 67 -99 SPO 1997 10 19 20 57 67 3.3 -9 673.80 -56.8 -53.6 -55.2 68 -99 SPO 1997 10 19 20 58 64 3.5 -9 673.80 -56.8 -53.6 -55.2 68 -99 SPO 1997 10 19 20 59 63 3.5 -9 673.80 -56.8 -53.6 -55.3 68 -99 SPO 1997 10 19 21 00 62 3.5 -9 673.80 -56.8 -53.7 -55.3 68 0 SPO 1997 10 19 21 01 63 3.4 -9 673.90 -56.8 -53.6 -55.3 68 -99 SPO 1997 10 19 21 02 65 3.3 -9 673.90 -56.8 -53.6 -55.3 68 -99 SPO 1997 10 19 21 03 65 3.3 -9 673.90 -56.8 -53.4 -55.2 68 -99 SPO 1997 10 19 21 04 65 3.4 -9 673.90 -56.8 -53.3 -55.2 68 -99 SPO 1997 10 19 21 05 63 3.5 -9 673.90 -56.7 -53.3 -55.2 67 -99 SPO 1997 10 19 21 06 63 3.5 -9 673.90 -56.7 -53.3 -55.2 66 -99 SPO 1997 10 19 21 07 62 3.5 -9 673.90 -56.7 -53.4 -55.3 66 -99 SPO 1997 10 19 21 08 62 3.5 -9 673.80 -56.7 -53.4 -55.4 66 -99 SPO 1997 10 19 21 09 63 3.4 -9 673.80 -56.8 -53.4 -55.4 66 -99 SPO 1997 10 19 21 10 63 3.4 -9 673.80 -56.8 -53.5 -55.4 67 -99 SPO 1997 10 19 21 11 63 3.4 -9 673.80 -56.8 -53.6 -55.5 67 -99 SPO 1997 10 19 21 12 63 3.5 -9 673.80 -56.8 -53.5 -55.5 67 -99 SPO 1997 10 19 21 13 61 3.7 -9 673.80 -56.7 -53.3 -55.6 66 -99 SPO 1997 10 19 21 14 61 3.8 -9 673.80 -56.7 -53.3 -55.6 66 -99 SPO 1997 10 19 21 15 61 3.9 -9 673.90 -56.7 -53.2 -55.6 66 -99 SPO 1997 10 19 21 16 63 3.9 -9 673.90 -56.6 -53.2 -55.5 65 -99 SPO 1997 10 19 21 17 64 3.8 -9 673.90 -56.6 -53.3 -55.5 65 -99 SPO 1997 10 19 21 18 65 3.7 -9 673.90 -56.6 -53.3 -55.4 66 -99 SPO 1997 10 19 21 19 65 3.7 -9 673.90 -56.6 -53.3 -55.4 66 -99 SPO 1997 10 19 21 20 65 3.6 -9 673.90 -56.5 -53.3 -55.4 65 -99 SPO 1997 10 19 21 21 66 3.7 -9 673.90 -56.5 -53.3 -55.4 65 -99 SPO 1997 10 19 21 22 65 3.7 -9 673.90 -56.5 -53.3 -55.4 65 -99 SPO 1997 10 19 21 23 65 3.9 -9 673.90 -56.5 -53.3 -55.4 65 -99 SPO 1997 10 19 21 24 65 3.9 -9 673.90 -56.6 -53.3 -55.4 66 -99 SPO 1997 10 19 21 25 65 4.0 -9 673.90 -56.6 -53.2 -55.5 66 -99 SPO 1997 10 19 21 26 64 4.1 -9 673.80 -56.6 -53.1 -55.5 66 -99 SPO 1997 10 19 21 27 64 4.2 -9 673.80 -56.5 -53.2 -55.5 66 -99 SPO 1997 10 19 21 28 63 4.2 -9 673.80 -56.5 -53.2 -55.6 66 -99 SPO 1997 10 19 21 29 64 4.2 -9 673.80 -56.5 -53.2 -55.6 66 -99 SPO 1997 10 19 21 30 63 4.4 -9 673.80 -56.4 -53.2 -55.7 65 -99 SPO 1997 10 19 21 31 61 4.5 -9 673.80 -56.5 -53.1 -55.8 66 -99 SPO 1997 10 19 21 32 59 4.6 -9 673.80 -56.4 -53.0 -55.8 65 -99 SPO 1997 10 19 21 33 59 4.6 -9 673.80 -56.5 -53.0 -55.9 65 -99 SPO 1997 10 19 21 34 58 4.6 -9 673.80 -56.5 -53.0 -55.9 65 -99 SPO 1997 10 19 21 35 57 4.5 -9 673.80 -56.5 -52.9 -55.9 65 -99 SPO 1997 10 19 21 36 57 4.5 -9 673.80 -56.5 -52.9 -55.9 65 -99 SPO 1997 10 19 21 37 55 4.7 -9 673.70 -56.4 -52.9 -55.9 65 -99 SPO 1997 10 19 21 38 54 4.9 -9 673.70 -56.4 -52.8 -55.9 65 -99 SPO 1997 10 19 21 39 53 4.9 -9 673.70 -56.4 -52.7 -55.9 65 -99 SPO 1997 10 19 21 40 52 4.9 -9 673.70 -56.4 -52.7 -55.9 66 -99 SPO 1997 10 19 21 41 52 4.9 -9 673.70 -56.3 -52.6 -55.8 65 -99 SPO 1997 10 19 21 42 54 4.8 -9 673.70 -56.3 -52.5 -55.8 65 -99 SPO 1997 10 19 21 43 56 4.7 -9 673.70 -56.2 -52.5 -55.7 64 -99 SPO 1997 10 19 21 44 59 4.5 -9 673.70 -56.3 -52.6 -55.7 65 -99 SPO 1997 10 19 21 45 62 4.3 -9 673.70 -56.4 -52.6 -55.7 66 -99 SPO 1997 10 19 21 46 64 4.3 -9 673.70 -56.4 -52.7 -55.7 65 -99 SPO 1997 10 19 21 47 64 4.4 -9 673.70 -56.4 -52.8 -55.7 65 -99 SPO 1997 10 19 21 48 63 4.3 -9 673.70 -56.4 -52.9 -55.8 65 -99 SPO 1997 10 19 21 49 62 4.5 -9 673.70 -56.4 -52.9 -55.8 65 -99 SPO 1997 10 19 21 50 60 4.5 -9 673.70 -56.4 -52.9 -55.8 66 -99 SPO 1997 10 19 21 51 59 4.5 -9 673.70 -56.4 -52.9 -55.9 66 -99 SPO 1997 10 19 21 52 59 4.6 -9 673.70 -56.4 -52.9 -55.8 67 -99 SPO 1997 10 19 21 53 60 4.5 -9 673.70 -56.4 -52.9 -55.9 67 -99 SPO 1997 10 19 21 54 61 4.5 -9 673.70 -56.4 -52.9 -55.9 67 -99 SPO 1997 10 19 21 55 60 4.5 -9 673.70 -56.4 -52.8 -55.9 67 -99 SPO 1997 10 19 21 56 59 4.5 -9 673.70 -56.4 -52.9 -55.9 66 -99 SPO 1997 10 19 21 57 59 4.4 -9 673.70 -56.4 -52.8 -55.9 65 -99 SPO 1997 10 19 21 58 59 4.4 -9 673.70 -56.4 -52.9 -55.8 65 -99 SPO 1997 10 19 21 59 58 4.4 -9 673.70 -56.4 -53.0 -55.8 65 -99 SPO 1997 10 19 22 00 59 4.4 -9 673.70 -56.4 -52.9 -55.8 65 0 SPO 1997 10 19 22 01 58 4.4 -9 673.70 -56.4 -52.9 -55.8 65 -99 SPO 1997 10 19 22 02 57 4.5 -9 673.70 -56.4 -52.9 -55.8 65 -99 SPO 1997 10 19 22 03 57 4.5 -9 673.70 -56.4 -52.9 -55.7 65 -99 SPO 1997 10 19 22 04 57 4.5 -9 673.70 -56.4 -53.0 -55.7 66 -99 SPO 1997 10 19 22 05 57 4.5 -9 673.70 -56.4 -53.0 -55.6 66 -99 SPO 1997 10 19 22 06 57 4.5 -9 673.60 -56.4 -52.9 -55.6 67 -99 SPO 1997 10 19 22 07 57 4.5 -9 673.60 -56.4 -52.9 -55.6 67 -99 SPO 1997 10 19 22 08 58 4.4 -9 673.60 -56.4 -52.8 -55.6 67 -99 SPO 1997 10 19 22 09 58 4.4 -9 673.60 -56.4 -52.9 -55.6 67 -99 SPO 1997 10 19 22 10 58 4.2 -9 673.60 -56.4 -52.8 -55.5 66 -99 SPO 1997 10 19 22 11 59 4.1 -9 673.70 -56.5 -52.9 -55.5 67 -99 SPO 1997 10 19 22 12 59 4.0 -9 673.70 -56.5 -53.0 -55.5 66 -99 SPO 1997 10 19 22 13 59 4.0 -9 673.70 -56.5 -53.0 -55.4 66 -99 SPO 1997 10 19 22 14 59 4.1 -9 673.70 -56.5 -53.1 -55.4 66 -99 SPO 1997 10 19 22 15 59 4.2 -9 673.70 -56.5 -53.2 -55.4 66 -99 SPO 1997 10 19 22 16 58 4.3 -9 673.60 -56.5 -53.1 -55.4 66 -99 SPO 1997 10 19 22 17 57 4.3 -9 673.60 -56.5 -53.2 -55.4 66 -99 SPO 1997 10 19 22 18 58 4.3 -9 673.60 -56.5 -53.2 -55.4 66 -99 SPO 1997 10 19 22 19 59 4.2 -9 673.60 -56.5 -53.3 -55.4 66 -99 SPO 1997 10 19 22 20 59 4.1 -9 673.60 -56.5 -53.2 -55.4 67 -99 SPO 1997 10 19 22 21 60 4.0 -9 673.60 -56.6 -53.2 -55.4 68 -99 SPO 1997 10 19 22 22 62 3.8 -9 673.60 -56.6 -53.2 -55.3 67 -99 SPO 1997 10 19 22 23 62 4.0 -9 673.60 -56.6 -53.3 -55.3 67 -99 SPO 1997 10 19 22 24 63 3.9 -9 673.70 -56.7 -53.2 -55.2 66 -99 SPO 1997 10 19 22 25 64 3.9 -9 673.70 -56.7 -53.2 -55.2 66 -99 SPO 1997 10 19 22 26 64 4.0 -9 673.70 -56.7 -53.2 -55.2 67 -99 SPO 1997 10 19 22 27 64 4.0 -9 673.60 -56.7 -53.1 -55.3 67 -99 SPO 1997 10 19 22 28 65 4.0 -9 673.60 -56.8 -53.1 -55.4 68 -99 SPO 1997 10 19 22 29 66 3.9 -9 673.60 -56.8 -53.0 -55.6 67 -99 SPO 1997 10 19 22 30 68 4.0 -9 673.60 -56.8 -52.9 -55.7 67 -99 SPO 1997 10 19 22 31 66 4.2 -9 673.60 -56.9 -52.8 -55.8 68 -99 SPO 1997 10 19 22 32 65 4.5 -9 673.60 -56.9 -52.7 -55.9 68 -99 SPO 1997 10 19 22 33 65 4.5 -9 673.60 -56.9 -52.6 -55.9 68 -99 SPO 1997 10 19 22 34 65 4.3 -9 673.60 -56.9 -52.8 -56.0 68 -99 SPO 1997 10 19 22 35 64 4.4 -9 673.60 -56.9 -53.0 -56.0 67 -99 SPO 1997 10 19 22 36 64 4.3 -9 673.70 -56.8 -52.9 -55.9 66 -99 SPO 1997 10 19 22 37 63 4.2 -9 673.60 -56.8 -53.0 -55.9 66 -99 SPO 1997 10 19 22 38 64 4.3 -9 673.60 -56.8 -52.8 -55.9 66 -99 SPO 1997 10 19 22 39 63 4.3 -9 673.60 -56.8 -52.9 -55.9 66 -99 SPO 1997 10 19 22 40 61 4.3 -9 673.60 -56.7 -53.0 -55.9 66 -99 SPO 1997 10 19 22 41 62 4.4 -9 673.50 -56.6 -52.8 -55.9 66 -99 SPO 1997 10 19 22 42 60 4.4 -9 673.50 -56.7 -53.0 -55.9 68 -99 SPO 1997 10 19 22 43 63 4.3 -9 673.50 -56.7 -52.9 -55.9 68 -99 SPO 1997 10 19 22 44 60 4.4 -9 673.50 -56.8 -53.0 -55.9 68 -99 SPO 1997 10 19 22 45 61 4.4 -9 673.50 -56.7 -53.0 -55.7 68 -99 SPO 1997 10 19 22 46 61 4.4 -9 673.50 -56.8 -53.0 -55.7 69 -99 SPO 1997 10 19 22 47 63 4.5 -9 673.50 -56.8 -52.7 -55.7 68 -99 SPO 1997 10 19 22 48 62 4.3 -9 673.50 -56.7 -52.8 -55.6 68 -99 SPO 1997 10 19 22 49 63 4.5 -9 673.50 -56.6 -52.6 -55.6 66 -99 SPO 1997 10 19 22 50 62 4.4 -9 673.50 -56.6 -52.6 -55.7 66 -99 SPO 1997 10 19 22 51 64 4.4 -9 673.50 -56.6 -52.6 -55.8 65 -99 SPO 1997 10 19 22 52 66 4.4 -9 673.50 -56.6 -52.6 -55.8 65 -99 SPO 1997 10 19 22 53 67 4.1 -9 673.50 -56.7 -52.7 -55.9 67 -99 SPO 1997 10 19 22 54 69 4.1 -9 673.50 -56.8 -52.8 -55.8 68 -99 SPO 1997 10 19 22 55 70 4.0 -9 673.50 -56.8 -52.6 -55.8 68 -99 SPO 1997 10 19 22 56 70 3.8 -9 673.50 -56.9 -53.0 -55.8 68 -99 SPO 1997 10 19 22 57 70 4.0 -9 673.50 -56.9 -52.8 -55.8 68 -99 SPO 1997 10 19 22 58 68 3.9 -9 673.50 -56.9 -53.4 -55.8 68 -99 SPO 1997 10 19 22 59 71 3.9 -9 673.50 -57.0 -53.0 -55.6 68 -99 SPO 1997 10 19 23 00 72 3.9 -9 673.50 -57.0 -52.9 -55.5 68 0 SPO 1997 10 19 23 01 73 3.8 -9 673.50 -57.0 -53.1 -55.4 67 -99 SPO 1997 10 19 23 02 73 3.7 -9 673.60 -57.1 -53.2 -55.4 66 -99 SPO 1997 10 19 23 03 72 3.9 -9 673.60 -57.2 -53.1 -55.5 67 -99 SPO 1997 10 19 23 04 70 4.0 -9 673.60 -57.2 -53.3 -55.5 65 -99 SPO 1997 10 19 23 05 69 4.0 -9 673.50 -57.2 -53.4 -55.6 66 -99 SPO 1997 10 19 23 06 68 4.2 -9 673.50 -57.2 -53.1 -55.6 67 -99 SPO 1997 10 19 23 07 67 4.2 -9 673.50 -57.3 -53.0 -55.7 67 -99 SPO 1997 10 19 23 08 65 4.3 -9 673.50 -57.3 -53.0 -55.8 67 -99 SPO 1997 10 19 23 09 65 4.4 -9 673.50 -57.3 -52.9 -55.8 67 -99 SPO 1997 10 19 23 10 65 4.3 -9 673.50 -57.3 -52.7 -55.9 67 -99 SPO 1997 10 19 23 11 65 4.4 -9 673.50 -57.3 -52.6 -55.9 67 -99 SPO 1997 10 19 23 12 65 4.2 -9 673.40 -57.3 -52.7 -56.0 67 -99 SPO 1997 10 19 23 13 65 4.3 -9 673.40 -57.2 -52.6 -55.9 66 -99 SPO 1997 10 19 23 14 63 4.3 -9 673.40 -57.2 -52.6 -56.0 66 -99 SPO 1997 10 19 23 15 63 4.5 -9 673.40 -57.1 -52.4 -56.0 65 -99 SPO 1997 10 19 23 16 62 4.4 -9 673.40 -57.0 -52.4 -56.0 64 -99 SPO 1997 10 19 23 17 62 4.5 -9 673.40 -57.0 -52.4 -56.1 64 -99 SPO 1997 10 19 23 18 64 4.6 -9 673.40 -56.8 -52.0 -56.1 64 -99 SPO 1997 10 19 23 19 65 4.3 -9 673.40 -56.8 -52.1 -56.1 65 -99 SPO 1997 10 19 23 20 67 4.3 -9 673.40 -56.8 -52.4 -56.1 66 -99 SPO 1997 10 19 23 21 68 4.3 -9 673.40 -56.8 -52.4 -56.0 67 -99 SPO 1997 10 19 23 22 69 4.2 -9 673.40 -56.8 -52.4 -55.8 67 -99 SPO 1997 10 19 23 23 70 4.2 -9 673.40 -56.9 -52.6 -55.7 68 -99 SPO 1997 10 19 23 24 71 4.2 -9 673.40 -57.0 -52.6 -55.6 68 -99 SPO 1997 10 19 23 25 72 4.2 -9 673.40 -57.0 -52.5 -55.6 68 -99 SPO 1997 10 19 23 26 72 4.2 -9 673.40 -57.0 -52.4 -55.6 68 -99 SPO 1997 10 19 23 27 71 4.1 -9 673.40 -57.1 -52.6 -55.6 68 -99 SPO 1997 10 19 23 28 70 4.2 -9 673.30 -57.1 -52.4 -55.5 66 -99 SPO 1997 10 19 23 29 70 4.2 -9 673.40 -57.2 -52.4 -55.6 67 -99 SPO 1997 10 19 23 30 70 4.3 -9 673.40 -57.2 -52.6 -55.6 66 -99 SPO 1997 10 19 23 31 70 4.3 -9 673.40 -57.3 -52.6 -55.8 67 -99 SPO 1997 10 19 23 32 70 4.3 -9 673.40 -57.4 -53.0 -56.0 67 -99 SPO 1997 10 19 23 33 71 4.3 -9 673.30 -57.5 -52.9 -56.2 69 -99 SPO 1997 10 19 23 34 69 4.3 -9 673.30 -57.5 -53.0 -56.2 69 -99 SPO 1997 10 19 23 35 69 4.5 -9 673.30 -57.5 -53.1 -56.0 68 -99 SPO 1997 10 19 23 36 68 4.5 -9 673.30 -57.4 -52.9 -56.0 67 -99 SPO 1997 10 19 23 37 65 4.5 -9 673.30 -57.4 -53.0 -56.0 67 -99 SPO 1997 10 19 23 38 64 4.6 -9 673.30 -57.4 -52.9 -56.1 67 -99 SPO 1997 10 19 23 39 64 4.6 -9 673.30 -57.4 -52.5 -56.0 67 -99 SPO 1997 10 19 23 40 63 4.6 -9 673.30 -57.4 -52.5 -56.0 67 -99 SPO 1997 10 19 23 41 63 4.8 -9 673.30 -57.2 -52.4 -55.8 66 -99 SPO 1997 10 19 23 42 64 4.5 -9 673.30 -57.0 -52.6 -55.7 64 -99 SPO 1997 10 19 23 43 66 4.7 -9 673.30 -56.9 -52.6 -55.6 64 -99 SPO 1997 10 19 23 44 66 4.6 -9 673.20 -57.1 -52.5 -55.7 67 -99 SPO 1997 10 19 23 45 66 4.7 -9 673.20 -57.2 -52.4 -55.9 67 -99 SPO 1997 10 19 23 46 67 4.7 -9 673.20 -57.1 -52.2 -55.8 66 -99 SPO 1997 10 19 23 47 65 4.6 -9 673.20 -57.2 -52.6 -55.8 68 -99 SPO 1997 10 19 23 48 65 4.5 -9 673.20 -57.1 -52.7 -55.8 68 -99 SPO 1997 10 19 23 49 65 4.5 -9 673.20 -57.2 -52.9 -55.8 68 -99 SPO 1997 10 19 23 50 66 4.5 -9 673.20 -57.2 -53.0 -55.8 68 -99 SPO 1997 10 19 23 51 66 4.5 -9 673.20 -57.3 -53.0 -55.9 69 -99 SPO 1997 10 19 23 52 66 4.6 -9 673.20 -57.2 -53.0 -55.9 68 -99 SPO 1997 10 19 23 53 66 4.6 -9 673.20 -57.1 -52.8 -55.9 67 -99 SPO 1997 10 19 23 54 68 4.6 -9 673.20 -57.1 -52.8 -55.8 67 -99 SPO 1997 10 19 23 55 67 4.7 -9 673.20 -57.1 -52.5 -55.8 67 -99 SPO 1997 10 19 23 56 67 4.7 -9 673.20 -57.1 -52.2 -55.7 66 -99 SPO 1997 10 19 23 57 66 4.7 -9 673.20 -57.2 -52.6 -55.7 67 -99 SPO 1997 10 19 23 58 66 4.4 -9 673.20 -57.1 -52.8 -55.7 -99 -99 SPO 1997 10 19 23 59 69 4.5 -9 673.20 -57.1 -52.6 -55.7 -99 -99 SPO 1997 10 20 00 00 71 4.0 -9 673.20 -57.1 -52.8 -55.6 -99 0 SPO 1997 10 20 00 01 71 4.4 -9 673.20 -57.2 -52.7 -55.7 -99 -99 SPO 1997 10 20 00 02 69 4.6 -9 673.20 -57.2 -52.7 -55.7 -99 -99 SPO 1997 10 20 00 03 67 4.8 -9 673.20 -57.2 -52.6 -55.8 68 -99 SPO 1997 10 20 00 04 67 4.7 -9 673.10 -57.2 -52.5 -55.8 67 -99 SPO 1997 10 20 00 05 67 4.8 -9 673.10 -57.1 -52.7 -55.8 66 -99 SPO 1997 10 20 00 06 66 4.9 -9 673.10 -57.1 -52.7 -55.9 66 -99 SPO 1997 10 20 00 07 68 4.7 -9 673.10 -57.1 -52.8 -55.8 67 -99 SPO 1997 10 20 00 08 68 4.8 -9 673.10 -57.1 -53.0 -55.8 67 -99 SPO 1997 10 20 00 09 68 4.9 -9 673.10 -57.1 -52.8 -55.8 66 -99 SPO 1997 10 20 00 10 67 5.0 -9 673.10 -57.1 -52.9 -55.9 66 -99 SPO 1997 10 20 00 11 68 5.1 -9 673.10 -57.0 -52.5 -55.8 65 -99 SPO 1997 10 20 00 12 68 5.0 -9 673.10 -57.0 -52.6 -55.8 64 -99 SPO 1997 10 20 00 13 69 4.9 -9 673.10 -57.0 -52.8 -55.8 65 -99 SPO 1997 10 20 00 14 70 4.8 -9 673.10 -57.1 -53.1 -55.8 66 -99 SPO 1997 10 20 00 15 71 4.7 -9 673.10 -57.1 -53.1 -55.8 67 -99 SPO 1997 10 20 00 16 70 4.8 -9 673.10 -57.1 -53.0 -55.7 67 -99 SPO 1997 10 20 00 17 70 4.8 -9 673.10 -57.1 -52.8 -55.6 68 -99 SPO 1997 10 20 00 18 72 4.6 -9 673.10 -57.0 -52.6 -55.6 67 -99 SPO 1997 10 20 00 19 73 4.4 -9 673.10 -57.1 -53.0 -55.6 68 -99 SPO 1997 10 20 00 20 74 4.3 -9 673.10 -57.1 -53.1 -55.5 68 -99 SPO 1997 10 20 00 21 74 4.4 -9 673.10 -57.1 -53.2 -55.5 68 -99 SPO 1997 10 20 00 22 74 4.6 -9 673.10 -57.2 -53.2 -55.6 68 -99 SPO 1997 10 20 00 23 74 4.5 -9 673.10 -57.2 -53.2 -55.7 68 -99 SPO 1997 10 20 00 24 74 4.4 -9 673.10 -57.2 -53.2 -55.8 68 -99 SPO 1997 10 20 00 25 74 4.3 -9 673.10 -57.2 -53.4 -55.9 67 -99 SPO 1997 10 20 00 26 74 4.1 -9 673.10 -57.3 -53.4 -56.0 67 -99 SPO 1997 10 20 00 27 75 4.2 -9 673.10 -57.4 -53.4 -56.1 68 -99 SPO 1997 10 20 00 28 75 4.1 -9 673.10 -57.4 -53.4 -56.0 68 -99 SPO 1997 10 20 00 29 74 4.1 -9 673.10 -57.4 -53.5 -55.9 68 -99 SPO 1997 10 20 00 30 74 4.1 -9 673.10 -57.5 -53.6 -55.8 68 -99 SPO 1997 10 20 00 31 73 4.3 -9 673.10 -57.5 -53.5 -55.8 68 -99 SPO 1997 10 20 00 32 72 4.6 -9 673.10 -57.5 -53.5 -55.9 68 -99 SPO 1997 10 20 00 33 73 4.7 -9 673.10 -57.4 -53.4 -55.9 67 -99 SPO 1997 10 20 00 34 73 4.7 -9 673.10 -57.4 -53.3 -55.9 67 -99 SPO 1997 10 20 00 35 73 4.6 -9 673.00 -57.3 -53.3 -56.0 66 -99 SPO 1997 10 20 00 36 73 4.5 -9 673.00 -57.3 -53.3 -56.2 67 -99 SPO 1997 10 20 00 37 73 4.5 -9 673.00 -57.3 -53.3 -56.3 67 -99 SPO 1997 10 20 00 38 72 4.6 -9 673.00 -57.3 -53.2 -56.4 67 -99 SPO 1997 10 20 00 39 73 4.6 -9 673.10 -57.3 -53.2 -56.4 66 -99 SPO 1997 10 20 00 40 73 4.6 -9 673.10 -57.3 -53.2 -56.3 66 -99 SPO 1997 10 20 00 41 74 4.5 -9 673.10 -57.3 -53.3 -56.4 67 -99 SPO 1997 10 20 00 42 75 4.5 -9 673.10 -57.4 -53.3 -56.4 68 -99 SPO 1997 10 20 00 43 76 4.3 -9 673.10 -57.4 -53.4 -56.5 68 -99 SPO 1997 10 20 00 44 77 4.4 -9 673.10 -57.5 -53.4 -56.5 69 -99 SPO 1997 10 20 00 45 78 4.4 -9 673.10 -57.6 -53.4 -56.5 70 -99 SPO 1997 10 20 00 46 78 4.4 -9 673.00 -57.6 -53.3 -56.3 69 -99 SPO 1997 10 20 00 47 77 4.4 -9 673.00 -57.6 -53.3 -56.2 68 -99 SPO 1997 10 20 00 48 75 4.5 -9 673.00 -57.7 -53.3 -56.2 69 -99 SPO 1997 10 20 00 49 73 4.6 -9 673.00 -57.7 -53.2 -56.2 68 -99 SPO 1997 10 20 00 50 72 4.7 -9 673.00 -57.7 -53.1 -56.1 67 -99 SPO 1997 10 20 00 51 71 4.8 -9 673.00 -57.6 -53.1 -56.1 65 -99 SPO 1997 10 20 00 52 72 4.6 -9 673.00 -57.6 -53.1 -56.0 65 -99 SPO 1997 10 20 00 53 73 4.5 -9 673.00 -57.6 -53.1 -55.9 66 -99 SPO 1997 10 20 00 54 73 4.6 -9 673.00 -57.6 -53.2 -55.9 67 -99 SPO 1997 10 20 00 55 73 4.7 -9 673.00 -57.5 -53.2 -55.8 67 -99 SPO 1997 10 20 00 56 72 4.7 -9 672.90 -57.4 -53.1 -55.8 66 -99 SPO 1997 10 20 00 57 72 4.7 -9 672.90 -57.4 -53.0 -55.8 66 -99 SPO 1997 10 20 00 58 72 4.6 -9 672.90 -57.3 -53.0 -55.8 66 -99 SPO 1997 10 20 00 59 72 4.7 -9 672.90 -57.3 -53.0 -55.8 67 -99 SPO 1997 10 20 01 00 73 4.6 -9 672.90 -57.2 -53.0 -55.6 67 0 SPO 1997 10 20 01 01 75 4.6 -9 672.90 -57.3 -53.0 -55.5 67 -99 SPO 1997 10 20 01 02 75 4.5 -9 672.90 -57.2 -53.0 -55.5 68 -99 SPO 1997 10 20 01 03 75 4.5 -9 672.90 -57.3 -53.0 -55.5 68 -99 SPO 1997 10 20 01 04 75 4.4 -9 672.90 -57.2 -53.0 -55.5 67 -99 SPO 1997 10 20 01 05 75 4.4 -9 672.90 -57.2 -53.1 -55.4 66 -99 SPO 1997 10 20 01 06 75 4.5 -9 672.90 -57.2 -53.0 -55.4 66 -99 SPO 1997 10 20 01 07 74 4.5 -9 672.90 -57.3 -53.0 -55.5 67 -99 SPO 1997 10 20 01 08 73 4.6 -9 672.90 -57.3 -52.8 -55.5 67 -99 SPO 1997 10 20 01 09 73 4.6 -9 672.80 -57.3 -52.8 -55.5 67 -99 SPO 1997 10 20 01 10 73 4.6 -9 672.90 -57.3 -52.6 -55.5 68 -99 SPO 1997 10 20 01 11 73 4.6 -9 672.80 -57.4 -52.7 -55.5 68 -99 SPO 1997 10 20 01 12 73 4.6 -9 672.80 -57.4 -52.8 -55.5 68 -99 SPO 1997 10 20 01 13 74 4.5 -9 672.80 -57.4 -52.8 -55.5 67 -99 SPO 1997 10 20 01 14 73 4.3 -9 672.80 -57.4 -52.9 -55.5 67 -99 SPO 1997 10 20 01 15 72 4.4 -9 672.80 -57.6 -52.9 -55.5 68 -99 SPO 1997 10 20 01 16 72 4.4 -9 672.80 -57.6 -53.0 -55.6 67 -99 SPO 1997 10 20 01 17 72 4.5 -9 672.80 -57.5 -53.0 -55.6 67 -99 SPO 1997 10 20 01 18 71 4.4 -9 672.80 -57.6 -53.0 -55.6 67 -99 SPO 1997 10 20 01 19 70 4.3 -9 672.80 -57.7 -52.9 -55.6 67 -99 SPO 1997 10 20 01 20 70 4.4 -9 672.80 -57.8 -52.8 -55.6 68 -99 SPO 1997 10 20 01 21 71 4.3 -9 672.80 -57.7 -52.9 -55.6 67 -99 SPO 1997 10 20 01 22 70 4.3 -9 672.80 -57.7 -52.9 -55.6 67 -99 SPO 1997 10 20 01 23 70 4.2 -9 672.80 -57.6 -52.8 -55.5 67 -99 SPO 1997 10 20 01 24 69 4.1 -9 672.80 -57.6 -52.8 -55.5 67 -99 SPO 1997 10 20 01 25 69 4.3 -9 672.70 -57.4 -52.8 -55.6 65 -99 SPO 1997 10 20 01 26 68 4.4 -9 672.70 -57.4 -52.9 -55.6 66 -99 SPO 1997 10 20 01 27 69 4.3 -9 672.70 -57.3 -52.8 -55.6 65 -99 SPO 1997 10 20 01 28 69 4.4 -9 672.70 -57.2 -52.7 -55.6 65 -99 SPO 1997 10 20 01 29 70 4.2 -9 672.70 -57.2 -52.7 -55.6 65 -99 SPO 1997 10 20 01 30 69 4.3 -9 672.70 -57.2 -52.7 -55.5 65 -99 SPO 1997 10 20 01 31 70 4.2 -9 672.70 -57.2 -52.7 -55.5 66 -99 SPO 1997 10 20 01 32 72 4.3 -9 672.80 -57.2 -52.7 -55.4 66 -99 SPO 1997 10 20 01 33 74 4.2 -9 672.80 -57.1 -52.8 -55.4 65 -99 SPO 1997 10 20 01 34 74 4.2 -9 672.80 -57.2 -52.9 -55.3 67 -99 SPO 1997 10 20 01 35 74 4.2 -9 672.80 -57.2 -52.9 -55.3 67 -99 SPO 1997 10 20 01 36 75 4.4 -9 672.80 -57.2 -52.9 -55.3 67 -99 SPO 1997 10 20 01 37 74 4.3 -9 672.80 -57.2 -52.8 -55.3 68 -99 SPO 1997 10 20 01 38 73 4.3 -9 672.70 -57.2 -52.8 -55.3 68 -99 SPO 1997 10 20 01 39 73 4.4 -9 672.70 -57.1 -52.8 -55.3 68 -99 SPO 1997 10 20 01 40 72 4.6 -9 672.70 -57.1 -52.7 -55.3 68 -99 SPO 1997 10 20 01 41 71 4.5 -9 672.70 -57.1 -52.7 -55.4 68 -99 SPO 1997 10 20 01 42 71 4.7 -9 672.70 -56.9 -52.6 -55.5 67 -99 SPO 1997 10 20 01 43 72 4.8 -9 672.70 -56.9 -52.5 -55.5 68 -99 SPO 1997 10 20 01 44 71 4.8 -9 672.70 -56.8 -52.6 -55.6 67 -99 SPO 1997 10 20 01 45 69 4.9 -9 672.70 -56.8 -52.6 -55.6 68 -99 SPO 1997 10 20 01 46 69 4.8 -9 672.70 -56.6 -52.6 -55.5 66 -99 SPO 1997 10 20 01 47 68 4.9 -9 672.70 -56.6 -52.5 -55.5 67 -99 SPO 1997 10 20 01 48 70 4.7 -9 672.60 -56.6 -52.6 -55.5 67 -99 SPO 1997 10 20 01 49 71 4.6 -9 672.60 -56.5 -52.6 -55.4 66 -99 SPO 1997 10 20 01 50 71 4.7 -9 672.60 -56.5 -52.6 -55.3 66 -99 SPO 1997 10 20 01 51 71 4.7 -9 672.60 -56.4 -52.6 -55.2 67 -99 SPO 1997 10 20 01 52 72 4.7 -9 672.60 -56.4 -52.6 -55.2 67 -99 SPO 1997 10 20 01 53 73 4.7 -9 672.60 -56.4 -52.6 -55.2 68 -99 SPO 1997 10 20 01 54 73 4.8 -9 672.60 -56.5 -52.6 -55.2 69 -99 SPO 1997 10 20 01 55 71 5.0 -9 672.60 -56.5 -52.5 -55.2 69 -99 SPO 1997 10 20 01 56 70 4.9 -9 672.60 -56.5 -52.4 -55.3 69 -99 SPO 1997 10 20 01 57 71 5.0 -9 672.50 -56.4 -52.4 -55.3 69 -99 SPO 1997 10 20 01 58 70 4.9 -9 672.50 -56.3 -52.4 -55.3 68 -99 SPO 1997 10 20 01 59 70 4.9 -9 672.50 -56.4 -52.4 -55.3 69 -99 SPO 1997 10 20 02 00 70 4.8 -9 672.50 -56.3 -52.3 -55.3 68 0 SPO 1997 10 20 02 01 71 4.7 -9 672.50 -56.3 -52.4 -55.2 67 -99 SPO 1997 10 20 02 02 71 4.7 -9 672.50 -56.4 -52.4 -55.2 67 -99 SPO 1997 10 20 02 03 69 4.7 -9 672.50 -56.4 -52.4 -55.2 67 -99 SPO 1997 10 20 02 04 70 4.6 -9 672.50 -56.4 -52.3 -55.2 67 -99 SPO 1997 10 20 02 05 72 4.6 -9 672.50 -56.4 -52.3 -55.2 67 -99 SPO 1997 10 20 02 06 73 4.5 -9 672.50 -56.4 -52.3 -55.1 67 -99 SPO 1997 10 20 02 07 73 4.6 -9 672.50 -56.4 -52.3 -55.0 67 -99 SPO 1997 10 20 02 08 73 4.5 -9 672.50 -56.5 -52.4 -55.0 68 -99 SPO 1997 10 20 02 09 73 4.6 -9 672.40 -56.5 -52.5 -55.0 68 -99 SPO 1997 10 20 02 10 74 4.6 -9 672.40 -56.5 -52.4 -55.0 68 -99 SPO 1997 10 20 02 11 76 4.5 -9 672.40 -56.5 -52.5 -54.9 68 -99 SPO 1997 10 20 02 12 76 4.6 -9 672.40 -56.6 -52.6 -54.9 68 -99 SPO 1997 10 20 02 13 76 4.7 -9 672.40 -56.6 -52.6 -54.9 68 -99 SPO 1997 10 20 02 14 76 4.7 -9 672.40 -56.7 -52.5 -54.9 68 -99 SPO 1997 10 20 02 15 77 4.6 -9 672.40 -56.7 -52.5 -54.9 68 -99 SPO 1997 10 20 02 16 78 4.6 -9 672.40 -56.7 -52.5 -54.9 68 -99 SPO 1997 10 20 02 17 77 4.6 -9 672.40 -56.8 -52.4 -54.9 68 -99 SPO 1997 10 20 02 18 76 4.6 -9 672.40 -56.8 -52.4 -54.9 68 -99 SPO 1997 10 20 02 19 76 4.6 -9 672.40 -56.7 -52.4 -55.0 68 -99 SPO 1997 10 20 02 20 76 4.6 -9 672.40 -56.7 -52.4 -55.0 68 -99 SPO 1997 10 20 02 21 76 4.6 -9 672.40 -56.7 -52.5 -55.0 68 -99 SPO 1997 10 20 02 22 76 4.6 -9 672.40 -56.7 -52.6 -55.0 68 -99 SPO 1997 10 20 02 23 76 4.6 -9 672.40 -56.8 -52.6 -55.0 68 -99 SPO 1997 10 20 02 24 76 4.6 -9 672.50 -56.8 -52.6 -55.0 68 -99 SPO 1997 10 20 02 25 76 4.6 -9 672.50 -56.8 -52.6 -55.0 68 -99 SPO 1997 10 20 02 26 77 4.5 -9 672.50 -56.9 -52.6 -54.9 68 -99 SPO 1997 10 20 02 27 78 4.4 -9 672.50 -56.9 -52.6 -54.9 68 -99 SPO 1997 10 20 02 28 76 4.4 -9 672.50 -57.0 -52.7 -54.9 68 -99 SPO 1997 10 20 02 29 75 4.4 -9 672.50 -57.0 -52.6 -54.9 68 -99 SPO 1997 10 20 02 30 74 4.3 -9 672.50 -57.0 -52.6 -54.9 68 -99 SPO 1997 10 20 02 31 73 4.3 -9 672.50 -57.1 -52.6 -54.9 68 -99 SPO 1997 10 20 02 32 73 4.5 -9 672.50 -57.1 -52.6 -55.0 68 -99 SPO 1997 10 20 02 33 73 4.4 -9 672.50 -57.0 -52.6 -55.0 68 -99 SPO 1997 10 20 02 34 73 4.3 -9 672.50 -57.0 -52.6 -55.0 68 -99 SPO 1997 10 20 02 35 75 4.2 -9 672.50 -57.0 -52.6 -54.9 68 -99 SPO 1997 10 20 02 36 75 4.2 -9 672.50 -57.0 -52.6 -54.8 68 -99 SPO 1997 10 20 02 37 75 4.3 -9 672.50 -57.0 -52.5 -54.8 68 -99 SPO 1997 10 20 02 38 77 4.2 -9 672.50 -57.0 -52.6 -54.8 68 -99 SPO 1997 10 20 02 39 78 4.1 -9 672.50 -57.1 -52.6 -54.8 68 -99 SPO 1997 10 20 02 40 77 4.1 -9 672.50 -57.2 -52.7 -54.8 68 -99 SPO 1997 10 20 02 41 75 4.4 -9 672.50 -57.3 -52.6 -54.9 67 -99 SPO 1997 10 20 02 42 74 4.5 -9 672.50 -57.3 -52.6 -54.9 67 -99 SPO 1997 10 20 02 43 76 4.5 -9 672.40 -57.1 -52.4 -54.9 67 -99 SPO 1997 10 20 02 44 75 4.3 -9 672.40 -57.0 -52.4 -54.8 67 -99 SPO 1997 10 20 02 45 75 4.3 -9 672.40 -57.1 -52.4 -54.8 68 -99 SPO 1997 10 20 02 46 74 4.2 -9 672.40 -57.2 -52.3 -54.8 69 -99 SPO 1997 10 20 02 47 75 4.3 -9 672.40 -57.2 -52.4 -54.9 69 -99 SPO 1997 10 20 02 48 74 4.2 -9 672.40 -57.2 -52.4 -54.8 68 -99 SPO 1997 10 20 02 49 74 4.2 -9 672.40 -57.0 -52.3 -54.9 67 -99 SPO 1997 10 20 02 50 75 4.0 -9 672.40 -57.0 -52.3 -54.8 68 -99 SPO 1997 10 20 02 51 76 4.2 -9 672.40 -57.3 -52.4 -54.8 70 -99 SPO 1997 10 20 02 52 76 4.4 -9 672.40 -57.3 -52.2 -54.8 69 -99 SPO 1997 10 20 02 53 75 4.4 -9 672.40 -57.3 -52.2 -54.9 68 -99 SPO 1997 10 20 02 54 75 4.5 -9 672.40 -57.4 -52.1 -54.9 68 -99 SPO 1997 10 20 02 55 76 4.4 -9 672.40 -57.3 -52.0 -55.0 67 -99 SPO 1997 10 20 02 56 76 4.6 -9 672.40 -57.3 -51.8 -55.0 67 -99 SPO 1997 10 20 02 57 76 4.4 -9 672.40 -57.0 -51.2 -55.0 65 -99 SPO 1997 10 20 02 58 76 4.3 -9 672.40 -57.3 -51.8 -54.9 68 -99 SPO 1997 10 20 02 59 76 4.3 -9 672.30 -57.3 -52.0 -54.9 69 -99 SPO 1997 10 20 03 00 74 4.4 -9 672.30 -57.2 -52.1 -54.9 68 0 SPO 1997 10 20 03 01 73 4.1 -9 672.30 -57.2 -52.1 -54.9 68 -99 SPO 1997 10 20 03 02 74 4.1 -9 672.30 -57.3 -52.2 -54.8 68 -99 SPO 1997 10 20 03 03 75 4.2 -9 672.30 -57.3 -52.1 -54.8 68 -99 SPO 1997 10 20 03 04 75 4.2 -9 672.30 -57.3 -52.1 -54.8 67 -99 SPO 1997 10 20 03 05 76 4.2 -9 672.30 -57.3 -52.1 -54.8 67 -99 SPO 1997 10 20 03 06 77 4.3 -9 672.30 -57.3 -52.1 -54.9 67 -99 SPO 1997 10 20 03 07 77 4.3 -9 672.30 -57.3 -52.1 -54.9 66 -99 SPO 1997 10 20 03 08 78 4.2 -9 672.30 -57.4 -52.1 -55.0 67 -99 SPO 1997 10 20 03 09 78 4.2 -9 672.30 -57.5 -52.1 -55.0 67 -99 SPO 1997 10 20 03 10 79 4.2 -9 672.30 -57.5 -52.1 -55.0 67 -99 SPO 1997 10 20 03 11 79 4.2 -9 672.30 -57.5 -52.0 -55.1 67 -99 SPO 1997 10 20 03 12 79 4.2 -9 672.30 -57.4 -52.0 -55.1 67 -99 SPO 1997 10 20 03 13 78 4.1 -9 672.20 -57.3 -52.0 -55.1 66 -99 SPO 1997 10 20 03 14 79 4.1 -9 672.20 -57.3 -52.0 -55.1 66 -99 SPO 1997 10 20 03 15 80 4.0 -9 672.20 -57.4 -52.1 -55.0 67 -99 SPO 1997 10 20 03 16 80 4.1 -9 672.20 -57.3 -52.1 -55.0 67 -99 SPO 1997 10 20 03 17 81 3.9 -9 672.20 -57.4 -52.1 -55.0 68 -99 SPO 1997 10 20 03 18 83 3.9 -9 672.20 -57.5 -52.1 -55.2 68 -99 SPO 1997 10 20 03 19 82 3.8 -9 672.20 -57.6 -52.2 -55.4 68 -99 SPO 1997 10 20 03 20 80 3.9 -9 672.20 -57.8 -52.1 -55.6 69 -99 SPO 1997 10 20 03 21 79 3.9 -9 672.20 -57.8 -52.1 -55.6 68 -99 SPO 1997 10 20 03 22 77 3.9 -9 672.20 -57.8 -52.0 -55.4 67 -99 SPO 1997 10 20 03 23 75 4.1 -9 672.20 -57.8 -52.0 -55.3 67 -99 SPO 1997 10 20 03 24 74 4.2 -9 672.20 -57.7 -52.0 -55.3 67 -99 SPO 1997 10 20 03 25 73 4.2 -9 672.20 -57.6 -52.0 -55.4 67 -99 SPO 1997 10 20 03 26 74 4.1 -9 672.20 -57.6 -52.0 -55.4 67 -99 SPO 1997 10 20 03 27 75 4.0 -9 672.20 -57.6 -51.9 -55.3 67 -99 SPO 1997 10 20 03 28 76 3.9 -9 672.20 -57.6 -52.0 -55.4 67 -99 SPO 1997 10 20 03 29 76 4.0 -9 672.20 -57.6 -52.0 -55.4 67 -99 SPO 1997 10 20 03 30 78 3.9 -9 672.20 -57.8 -52.0 -55.5 68 -99 SPO 1997 10 20 03 31 77 3.9 -9 672.20 -57.8 -52.0 -55.6 67 -99 SPO 1997 10 20 03 32 77 3.9 -9 672.20 -57.8 -52.0 -55.7 67 -99 SPO 1997 10 20 03 33 76 4.0 -9 672.20 -57.9 -52.0 -55.7 68 -99 SPO 1997 10 20 03 34 75 4.0 -9 672.20 -58.0 -51.9 -55.7 68 -99 SPO 1997 10 20 03 35 74 4.1 -9 672.20 -58.0 -51.8 -55.7 67 -99 SPO 1997 10 20 03 36 74 4.1 -9 672.20 -58.0 -51.8 -55.6 67 -99 SPO 1997 10 20 03 37 73 4.1 -9 672.10 -58.0 -51.8 -55.6 67 -99 SPO 1997 10 20 03 38 73 4.0 -9 672.10 -57.9 -51.7 -55.6 67 -99 SPO 1997 10 20 03 39 74 3.9 -9 672.10 -58.0 -51.8 -55.6 69 -99 SPO 1997 10 20 03 40 75 4.0 -9 672.10 -57.9 -51.8 -55.7 68 -99 SPO 1997 10 20 03 41 77 3.8 -9 672.10 -57.9 -51.8 -55.7 68 -99 SPO 1997 10 20 03 42 76 3.9 -9 672.10 -57.9 -51.8 -55.8 68 -99 SPO 1997 10 20 03 43 77 3.9 -9 672.10 -57.8 -51.7 -55.7 67 -99 SPO 1997 10 20 03 44 78 3.8 -9 672.10 -57.8 -51.7 -55.8 67 -99 SPO 1997 10 20 03 45 78 3.9 -9 672.10 -57.9 -51.7 -55.9 67 -99 SPO 1997 10 20 03 46 79 3.8 -9 672.10 -57.9 -51.7 -56.0 67 -99 SPO 1997 10 20 03 47 78 3.8 -9 672.00 -58.0 -51.6 -56.1 66 -99 SPO 1997 10 20 03 48 77 4.0 -9 672.00 -57.9 -51.6 -56.0 66 -99 SPO 1997 10 20 03 49 76 4.1 -9 672.00 -57.9 -51.7 -55.9 66 -99 SPO 1997 10 20 03 50 77 4.1 -9 672.00 -57.8 -51.6 -55.8 66 -99 SPO 1997 10 20 03 51 78 4.0 -9 672.00 -57.8 -51.6 -55.8 67 -99 SPO 1997 10 20 03 52 78 3.9 -9 672.00 -57.9 -51.6 -55.8 67 -99 SPO 1997 10 20 03 53 80 3.7 -9 672.00 -58.0 -51.7 -56.0 68 -99 SPO 1997 10 20 03 54 82 3.7 -9 672.00 -58.0 -51.7 -56.2 68 -99 SPO 1997 10 20 03 55 82 3.7 -9 672.00 -57.9 -51.6 -56.2 67 -99 SPO 1997 10 20 03 56 80 3.8 -9 672.00 -57.9 -51.6 -56.1 67 -99 SPO 1997 10 20 03 57 80 3.8 -9 672.00 -57.9 -51.6 -56.0 68 -99 SPO 1997 10 20 03 58 80 3.8 -9 672.00 -57.9 -51.5 -55.9 67 -99 SPO 1997 10 20 03 59 80 3.8 -9 672.00 -58.0 -51.5 -56.0 68 -99 SPO 1997 10 20 04 00 79 3.8 -9 671.90 -58.0 -51.4 -56.0 68 0 SPO 1997 10 20 04 01 79 3.8 -9 671.90 -58.0 -51.4 -55.9 67 -99 SPO 1997 10 20 04 02 78 3.8 -9 671.90 -58.0 -51.4 -55.9 66 -99 SPO 1997 10 20 04 03 77 3.8 -9 671.90 -58.0 -51.2 -55.8 66 -99 SPO 1997 10 20 04 04 77 3.9 -9 671.90 -57.9 -51.1 -55.7 67 -99 SPO 1997 10 20 04 05 79 3.9 -9 671.90 -57.9 -51.2 -55.8 67 -99 SPO 1997 10 20 04 06 81 3.8 -9 671.90 -58.0 -51.2 -56.1 68 -99 SPO 1997 10 20 04 07 81 3.8 -9 671.90 -58.0 -51.2 -56.2 68 -99 SPO 1997 10 20 04 08 80 3.9 -9 671.90 -57.8 -51.1 -56.0 67 -99 SPO 1997 10 20 04 09 81 3.9 -9 671.90 -57.9 -51.1 -55.9 68 -99 SPO 1997 10 20 04 10 81 3.9 -9 671.90 -57.9 -51.1 -56.0 68 -99 SPO 1997 10 20 04 11 79 3.9 -9 671.90 -57.8 -51.1 -55.9 67 -99 SPO 1997 10 20 04 12 81 3.8 -9 671.90 -57.8 -51.1 -55.8 67 -99 SPO 1997 10 20 04 13 81 3.8 -9 671.90 -57.7 -51.2 -55.8 67 -99 SPO 1997 10 20 04 14 81 3.9 -9 671.90 -57.7 -51.0 -55.7 67 -99 SPO 1997 10 20 04 15 83 3.8 -9 671.90 -57.8 -51.1 -55.8 68 -99 SPO 1997 10 20 04 16 86 3.6 -9 671.90 -57.8 -51.2 -55.9 68 -99 SPO 1997 10 20 04 17 86 3.6 -9 671.90 -57.8 -51.2 -56.2 68 -99 SPO 1997 10 20 04 18 86 3.7 -9 671.90 -57.8 -51.1 -56.2 68 -99 SPO 1997 10 20 04 19 85 3.7 -9 671.90 -57.7 -51.0 -56.2 68 -99 SPO 1997 10 20 04 20 84 3.7 -9 671.90 -57.8 -51.0 -56.2 69 -99 SPO 1997 10 20 04 21 84 3.6 -9 671.90 -57.8 -51.0 -56.2 68 -99 SPO 1997 10 20 04 22 85 3.6 -9 671.90 -57.8 -51.0 -56.2 68 -99 SPO 1997 10 20 04 23 85 3.7 -9 671.90 -57.8 -51.1 -56.2 68 -99 SPO 1997 10 20 04 24 84 3.7 -9 671.90 -57.7 -51.1 -56.1 67 -99 SPO 1997 10 20 04 25 84 3.7 -9 671.90 -57.7 -51.1 -56.0 67 -99 SPO 1997 10 20 04 26 83 3.8 -9 671.90 -57.7 -51.2 -56.0 67 -99 SPO 1997 10 20 04 27 82 3.9 -9 671.90 -57.7 -51.1 -55.8 67 -99 SPO 1997 10 20 04 28 81 4.0 -9 671.90 -57.6 -51.1 -55.6 67 -99 SPO 1997 10 20 04 29 80 4.1 -9 671.90 -57.6 -51.0 -55.5 67 -99 SPO 1997 10 20 04 30 81 4.1 -9 671.90 -57.6 -51.0 -55.5 67 -99 SPO 1997 10 20 04 31 83 4.0 -9 671.90 -57.6 -51.0 -55.6 68 -99 SPO 1997 10 20 04 32 84 4.1 -9 671.90 -57.6 -51.0 -55.8 68 -99 SPO 1997 10 20 04 33 85 4.1 -9 671.90 -57.6 -51.0 -56.0 69 -99 SPO 1997 10 20 04 34 87 4.1 -9 671.90 -57.6 -51.0 -56.0 69 -99 SPO 1997 10 20 04 35 89 4.1 -9 671.90 -57.6 -51.0 -56.1 69 -99 SPO 1997 10 20 04 36 91 4.0 -9 671.90 -57.5 -51.0 -56.2 69 -99 SPO 1997 10 20 04 37 92 3.9 -9 671.90 -57.5 -51.0 -56.3 69 -99 SPO 1997 10 20 04 38 93 3.9 -9 671.90 -57.5 -51.1 -56.3 68 -99 SPO 1997 10 20 04 39 92 3.9 -9 671.80 -57.5 -51.1 -56.3 68 -99 SPO 1997 10 20 04 40 92 3.8 -9 671.80 -57.5 -51.1 -56.2 68 -99 SPO 1997 10 20 04 41 93 3.7 -9 671.80 -57.5 -51.1 -56.2 68 -99 SPO 1997 10 20 04 42 94 3.7 -9 671.80 -57.5 -51.2 -56.4 68 -99 SPO 1997 10 20 04 43 93 3.7 -9 671.80 -57.5 -51.1 -56.4 69 -99 SPO 1997 10 20 04 44 91 3.7 -9 671.80 -57.5 -51.1 -56.3 69 -99 SPO 1997 10 20 04 45 90 3.6 -9 671.80 -57.4 -51.1 -56.3 69 -99 SPO 1997 10 20 04 46 89 3.6 -9 671.80 -57.5 -51.0 -56.2 70 -99 SPO 1997 10 20 04 47 89 3.7 -9 671.80 -57.4 -51.0 -56.1 69 -99 SPO 1997 10 20 04 48 89 3.6 -9 671.80 -57.4 -51.0 -56.1 69 -99 SPO 1997 10 20 04 49 89 3.6 -9 671.80 -57.4 -51.0 -56.2 69 -99 SPO 1997 10 20 04 50 88 3.7 -9 671.80 -57.5 -50.9 -56.2 70 -99 SPO 1997 10 20 04 51 85 3.9 -9 671.80 -57.5 -50.8 -56.1 69 -99 SPO 1997 10 20 04 52 84 3.9 -9 671.80 -57.5 -50.8 -56.0 69 -99 SPO 1997 10 20 04 53 83 3.9 -9 671.80 -57.4 -50.6 -55.8 68 -99 SPO 1997 10 20 04 54 83 3.9 -9 671.80 -57.4 -50.6 -55.8 68 -99 SPO 1997 10 20 04 55 83 4.0 -9 671.80 -57.4 -50.5 -55.8 67 -99 SPO 1997 10 20 04 56 83 4.0 -9 671.80 -57.4 -50.5 -55.8 68 -99 SPO 1997 10 20 04 57 83 4.1 -9 671.70 -57.3 -50.5 -55.8 67 -99 SPO 1997 10 20 04 58 82 4.2 -9 671.70 -57.3 -50.5 -55.8 68 -99 SPO 1997 10 20 04 59 82 4.2 -9 671.70 -57.4 -50.4 -55.8 69 -99 SPO 1997 10 20 05 00 82 4.2 -9 671.70 -57.4 -50.3 -55.8 69 0 SPO 1997 10 20 05 01 83 4.1 -9 671.70 -57.4 -50.2 -55.9 69 -99 SPO 1997 10 20 05 02 85 4.0 -9 671.70 -57.3 -50.2 -55.9 68 -99 SPO 1997 10 20 05 03 86 4.0 -9 671.70 -57.3 -50.2 -56.0 69 -99 SPO 1997 10 20 05 04 87 4.0 -9 671.70 -57.4 -50.2 -56.2 69 -99 SPO 1997 10 20 05 05 89 4.0 -9 671.70 -57.4 -50.2 -56.3 69 -99 SPO 1997 10 20 05 06 90 3.9 -9 671.70 -57.4 -50.3 -56.5 69 -99 SPO 1997 10 20 05 07 91 3.8 -9 671.70 -57.5 -50.4 -56.6 70 -99 SPO 1997 10 20 05 08 92 3.7 -9 671.70 -57.5 -50.5 -56.7 69 -99 SPO 1997 10 20 05 09 93 3.7 -9 671.70 -57.5 -50.7 -56.7 69 -99 SPO 1997 10 20 05 10 93 3.6 -9 671.70 -57.5 -50.7 -56.7 69 -99 SPO 1997 10 20 05 11 91 3.6 -9 671.70 -57.5 -50.7 -56.7 69 -99 SPO 1997 10 20 05 12 88 3.8 -9 671.60 -57.5 -50.6 -56.5 69 -99 SPO 1997 10 20 05 13 85 3.7 -9 671.60 -57.4 -50.6 -56.2 68 -99 SPO 1997 10 20 05 14 84 3.6 -9 671.60 -57.4 -50.6 -56.0 68 -99 SPO 1997 10 20 05 15 83 3.6 -9 671.60 -57.5 -50.6 -56.0 69 -99 SPO 1997 10 20 05 16 84 3.6 -9 671.60 -57.5 -50.6 -56.0 69 -99 SPO 1997 10 20 05 17 84 3.6 -9 671.60 -57.5 -50.5 -56.0 69 -99 SPO 1997 10 20 05 18 85 3.6 -9 671.60 -57.6 -50.5 -56.1 70 -99 SPO 1997 10 20 05 19 86 3.5 -9 671.60 -57.6 -50.5 -56.2 69 -99 SPO 1997 10 20 05 20 88 3.4 -9 671.60 -57.6 -50.5 -56.3 68 -99 SPO 1997 10 20 05 21 90 3.4 -9 671.60 -57.6 -50.5 -56.5 67 -99 SPO 1997 10 20 05 22 92 3.2 -9 671.60 -57.6 -50.5 -56.6 67 -99 SPO 1997 10 20 05 23 94 3.2 -9 671.60 -57.6 -50.6 -56.7 68 -99 SPO 1997 10 20 05 24 93 3.3 -9 671.60 -57.7 -50.5 -56.8 69 -99 SPO 1997 10 20 05 25 92 3.4 -9 671.60 -57.6 -50.4 -56.7 69 -99 SPO 1997 10 20 05 26 92 3.4 -9 671.60 -57.6 -50.2 -56.5 69 -99 SPO 1997 10 20 05 27 92 3.4 -9 671.60 -57.6 -50.1 -56.6 70 -99 SPO 1997 10 20 05 28 93 3.4 -9 671.60 -57.7 -50.0 -56.6 71 -99 SPO 1997 10 20 05 29 94 3.4 -9 671.60 -57.7 -50.0 -56.7 70 -99 SPO 1997 10 20 05 30 95 3.4 -9 671.60 -57.7 -50.0 -56.7 69 -99 SPO 1997 10 20 05 31 94 3.4 -9 671.60 -57.7 -49.9 -56.7 69 -99 SPO 1997 10 20 05 32 94 3.4 -9 671.60 -57.8 -49.9 -56.7 69 -99 SPO 1997 10 20 05 33 93 3.5 -9 671.60 -57.8 -49.9 -56.8 68 -99 SPO 1997 10 20 05 34 92 3.4 -9 671.60 -57.8 -49.9 -56.7 68 -99 SPO 1997 10 20 05 35 92 3.4 -9 671.60 -57.8 -49.8 -56.6 68 -99 SPO 1997 10 20 05 36 91 3.4 -9 671.60 -57.8 -49.8 -56.6 67 -99 SPO 1997 10 20 05 37 91 3.4 -9 671.60 -57.9 -49.8 -56.6 68 -99 SPO 1997 10 20 05 38 91 3.4 -9 671.60 -57.9 -49.8 -56.6 68 -99 SPO 1997 10 20 05 39 92 3.4 -9 671.60 -57.9 -49.8 -56.6 68 -99 SPO 1997 10 20 05 40 94 3.3 -9 671.60 -57.9 -49.8 -56.8 69 -99 SPO 1997 10 20 05 41 96 3.3 -9 671.60 -57.9 -49.8 -56.9 70 -99 SPO 1997 10 20 05 42 97 3.3 -9 671.60 -57.9 -49.9 -57.0 70 -99 SPO 1997 10 20 05 43 97 3.3 -9 671.60 -57.8 -49.8 -56.9 70 -99 SPO 1997 10 20 05 44 97 3.3 -9 671.60 -57.8 -49.9 -56.9 70 -99 SPO 1997 10 20 05 45 97 3.3 -9 671.60 -57.9 -49.9 -56.9 70 -99 SPO 1997 10 20 05 46 98 3.3 -9 671.60 -57.8 -49.9 -56.9 68 -99 SPO 1997 10 20 05 47 99 3.3 -9 671.60 -57.7 -49.8 -56.8 67 -99 SPO 1997 10 20 05 48 100 3.3 -9 671.60 -57.7 -49.8 -56.8 67 -99 SPO 1997 10 20 05 49 98 3.3 -9 671.60 -57.7 -49.8 -56.8 67 -99 SPO 1997 10 20 05 50 95 3.3 -9 671.60 -57.7 -49.8 -56.7 67 -99 SPO 1997 10 20 05 51 90 3.4 -9 671.50 -57.7 -49.6 -56.4 67 -99 SPO 1997 10 20 05 52 87 3.5 -9 671.50 -57.6 -49.4 -56.1 67 -99 SPO 1997 10 20 05 53 87 3.4 -9 671.50 -57.6 -49.2 -55.9 67 -99 SPO 1997 10 20 05 54 87 3.5 -9 671.50 -57.6 -49.1 -55.8 67 -99 SPO 1997 10 20 05 55 88 3.6 -9 671.50 -57.6 -49.0 -55.8 68 -99 SPO 1997 10 20 05 56 89 3.5 -9 671.50 -57.6 -49.0 -55.8 68 -99 SPO 1997 10 20 05 57 92 3.5 -9 671.50 -57.6 -49.1 -55.9 68 -99 SPO 1997 10 20 05 58 93 3.5 -9 671.50 -57.6 -49.1 -56.0 68 -99 SPO 1997 10 20 05 59 94 3.5 -9 671.50 -57.5 -49.2 -56.2 68 -99 SPO 1997 10 20 06 00 94 3.5 -9 671.50 -57.5 -49.3 -56.2 67 0 SPO 1997 10 20 06 01 93 3.6 -9 671.50 -57.5 -49.2 -56.2 67 -99 SPO 1997 10 20 06 02 94 3.5 -9 671.50 -57.5 -49.2 -56.0 67 -99 SPO 1997 10 20 06 03 96 3.5 -9 671.50 -57.5 -49.2 -56.1 67 -99 SPO 1997 10 20 06 04 98 3.5 -9 671.50 -57.5 -49.1 -56.2 67 -99 SPO 1997 10 20 06 05 98 3.6 -9 671.50 -57.5 -49.1 -56.2 68 -99 SPO 1997 10 20 06 06 98 3.6 -9 671.50 -57.5 -49.0 -56.2 68 -99 SPO 1997 10 20 06 07 97 3.6 -9 671.50 -57.6 -49.1 -56.2 69 -99 SPO 1997 10 20 06 08 96 3.6 -9 671.50 -57.6 -49.2 -56.2 70 -99 SPO 1997 10 20 06 09 95 3.6 -9 671.50 -57.7 -49.2 -56.2 71 -99 SPO 1997 10 20 06 10 95 3.6 -9 671.50 -57.8 -49.1 -56.2 71 -99 SPO 1997 10 20 06 11 96 3.5 -9 671.50 -57.8 -49.1 -56.2 70 -99 SPO 1997 10 20 06 12 97 3.4 -9 671.50 -57.8 -49.0 -56.2 70 -99 SPO 1997 10 20 06 13 99 3.4 -9 671.50 -57.8 -49.0 -56.2 70 -99 SPO 1997 10 20 06 14 102 3.4 -9 671.50 -57.8 -49.0 -56.4 70 -99 SPO 1997 10 20 06 15 104 3.4 -9 671.50 -57.8 -49.0 -56.5 70 -99 SPO 1997 10 20 06 16 105 3.5 -9 671.40 -57.7 -49.0 -56.5 68 -99 SPO 1997 10 20 06 17 104 3.5 -9 671.40 -57.6 -49.0 -56.5 68 -99 SPO 1997 10 20 06 18 101 3.5 -9 671.40 -57.5 -48.9 -56.3 67 -99 SPO 1997 10 20 06 19 99 3.5 -9 671.40 -57.5 -48.7 -56.2 68 -99 SPO 1997 10 20 06 20 98 3.5 -9 671.40 -57.5 -48.5 -56.0 69 -99 SPO 1997 10 20 06 21 98 3.5 -9 671.40 -57.5 -48.5 -56.0 69 -99 SPO 1997 10 20 06 22 100 3.4 -9 671.40 -57.5 -48.5 -56.1 69 -99 SPO 1997 10 20 06 23 100 3.4 -9 671.40 -57.5 -48.6 -56.1 69 -99 SPO 1997 10 20 06 24 100 3.4 -9 671.40 -57.5 -48.7 -56.1 69 -99 SPO 1997 10 20 06 25 99 3.5 -9 671.40 -57.5 -48.7 -56.0 69 -99 SPO 1997 10 20 06 26 98 3.5 -9 671.40 -57.5 -48.6 -56.0 69 -99 SPO 1997 10 20 06 27 97 3.6 -9 671.30 -57.4 -48.6 -55.8 68 -99 SPO 1997 10 20 06 28 98 3.6 -9 671.30 -57.4 -48.5 -55.7 68 -99 SPO 1997 10 20 06 29 98 3.6 -9 671.30 -57.4 -48.4 -55.8 68 -99 SPO 1997 10 20 06 30 99 3.7 -9 671.30 -57.4 -48.4 -55.8 68 -99 SPO 1997 10 20 06 31 100 3.6 -9 671.30 -57.4 -48.5 -55.9 68 -99 SPO 1997 10 20 06 32 99 3.6 -9 671.30 -57.4 -48.5 -55.9 69 -99 SPO 1997 10 20 06 33 99 3.6 -9 671.30 -57.4 -48.6 -55.8 69 -99 SPO 1997 10 20 06 34 99 3.6 -9 671.30 -57.4 -48.6 -55.8 70 -99 SPO 1997 10 20 06 35 98 3.7 -9 671.30 -57.3 -48.7 -55.7 70 -99 SPO 1997 10 20 06 36 96 3.6 -9 671.30 -57.3 -48.7 -55.6 70 -99 SPO 1997 10 20 06 37 93 3.7 -9 671.30 -57.3 -48.7 -55.4 70 -99 SPO 1997 10 20 06 38 91 3.7 -9 671.20 -57.3 -48.6 -55.2 70 -99 SPO 1997 10 20 06 39 90 3.6 -9 671.20 -57.3 -48.7 -55.1 69 -99 SPO 1997 10 20 06 40 91 3.6 -9 671.20 -57.3 -48.7 -55.1 69 -99 SPO 1997 10 20 06 41 92 3.6 -9 671.20 -57.3 -48.8 -55.1 68 -99 SPO 1997 10 20 06 42 93 3.5 -9 671.20 -57.3 -48.8 -55.1 67 -99 SPO 1997 10 20 06 43 92 3.5 -9 671.20 -57.3 -48.8 -55.2 67 -99 SPO 1997 10 20 06 44 91 3.6 -9 671.20 -57.3 -48.8 -55.1 68 -99 SPO 1997 10 20 06 45 90 3.7 -9 671.20 -57.3 -48.7 -55.1 69 -99 SPO 1997 10 20 06 46 87 3.6 -9 671.10 -57.3 -48.6 -55.1 69 -99 SPO 1997 10 20 06 47 86 3.6 -9 671.10 -57.2 -48.6 -55.0 69 -99 SPO 1997 10 20 06 48 85 3.5 -9 671.10 -57.1 -48.4 -54.9 68 -99 SPO 1997 10 20 06 49 84 3.6 -9 671.10 -57.1 -48.3 -54.8 69 -99 SPO 1997 10 20 06 50 84 3.6 -9 671.10 -57.1 -48.1 -54.7 69 -99 SPO 1997 10 20 06 51 83 3.4 -9 671.10 -57.1 -48.0 -54.7 69 -99 SPO 1997 10 20 06 52 83 3.5 -9 671.10 -57.1 -48.0 -54.6 69 -99 SPO 1997 10 20 06 53 82 3.6 -9 671.10 -57.2 -48.0 -54.6 70 -99 SPO 1997 10 20 06 54 82 3.5 -9 671.10 -57.2 -47.9 -54.7 69 -99 SPO 1997 10 20 06 55 82 3.6 -9 671.10 -57.1 -47.8 -54.6 68 -99 SPO 1997 10 20 06 56 82 3.6 -9 671.10 -57.1 -47.7 -54.6 68 -99 SPO 1997 10 20 06 57 84 3.6 -9 671.10 -57.1 -47.7 -54.6 68 -99 SPO 1997 10 20 06 58 86 3.5 -9 671.10 -57.2 -47.8 -54.7 68 -99 SPO 1997 10 20 06 59 88 3.4 -9 671.10 -57.2 -48.0 -54.6 68 -99 SPO 1997 10 20 07 00 90 3.4 -9 671.10 -57.2 -48.2 -54.7 68 0 SPO 1997 10 20 07 01 92 3.5 -9 671.10 -57.2 -48.4 -54.8 68 -99 SPO 1997 10 20 07 02 92 3.5 -9 671.10 -57.2 -48.6 -54.9 69 -99 SPO 1997 10 20 07 03 92 3.5 -9 671.10 -57.3 -48.6 -55.0 70 -99 SPO 1997 10 20 07 04 90 3.5 -9 671.10 -57.2 -48.6 -54.8 69 -99 SPO 1997 10 20 07 05 90 3.5 -9 671.10 -57.2 -48.6 -54.7 70 -99 SPO 1997 10 20 07 06 90 3.5 -9 671.10 -57.1 -48.5 -54.6 69 -99 SPO 1997 10 20 07 07 90 3.5 -9 671.10 -57.1 -48.4 -54.6 69 -99 SPO 1997 10 20 07 08 92 3.5 -9 671.10 -57.1 -48.4 -54.6 69 -99 SPO 1997 10 20 07 09 93 3.5 -9 671.10 -57.2 -48.4 -54.7 70 -99 SPO 1997 10 20 07 10 94 3.5 -9 671.10 -57.2 -48.4 -54.8 69 -99 SPO 1997 10 20 07 11 96 3.5 -9 671.10 -57.3 -48.4 -55.0 69 -99 SPO 1997 10 20 07 12 98 3.5 -9 671.10 -57.4 -48.4 -55.4 70 -99 SPO 1997 10 20 07 13 99 3.5 -9 671.10 -57.5 -48.6 -55.7 71 -99 SPO 1997 10 20 07 14 99 3.4 -9 671.10 -57.5 -48.7 -55.9 71 -99 SPO 1997 10 20 07 15 98 3.4 -9 671.10 -57.4 -48.7 -55.8 70 -99 SPO 1997 10 20 07 16 97 3.5 -9 671.10 -57.4 -48.6 -55.6 70 -99 SPO 1997 10 20 07 17 96 3.5 -9 671.00 -57.4 -48.4 -55.4 70 -99 SPO 1997 10 20 07 18 95 3.5 -9 671.00 -57.3 -48.2 -55.2 69 -99 SPO 1997 10 20 07 19 95 3.4 -9 671.00 -57.3 -48.1 -55.0 69 -99 SPO 1997 10 20 07 20 95 3.4 -9 671.00 -57.3 -48.1 -54.9 68 -99 SPO 1997 10 20 07 21 97 3.4 -9 671.00 -57.3 -47.9 -54.9 69 -99 SPO 1997 10 20 07 22 98 3.5 -9 671.00 -57.2 -47.7 -54.8 68 -99 SPO 1997 10 20 07 23 98 3.5 -9 671.00 -57.2 -47.7 -54.8 68 -99 SPO 1997 10 20 07 24 98 3.6 -9 671.00 -57.2 -47.7 -54.8 68 -99 SPO 1997 10 20 07 25 98 3.6 -9 671.00 -57.2 -47.6 -54.8 68 -99 SPO 1997 10 20 07 26 98 3.6 -9 671.00 -57.1 -47.6 -54.8 68 -99 SPO 1997 10 20 07 27 98 3.6 -9 671.00 -57.1 -47.6 -54.8 68 -99 SPO 1997 10 20 07 28 98 3.6 -9 671.00 -57.1 -47.7 -54.8 69 -99 SPO 1997 10 20 07 29 97 3.6 -9 671.00 -57.1 -47.7 -54.8 69 -99 SPO 1997 10 20 07 30 96 3.6 -9 671.00 -57.1 -47.7 -54.8 69 -99 SPO 1997 10 20 07 31 95 3.6 -9 671.00 -57.1 -47.6 -54.8 69 -99 SPO 1997 10 20 07 32 95 3.7 -9 671.00 -57.1 -47.4 -54.8 70 -99 SPO 1997 10 20 07 33 93 3.7 -9 671.00 -57.1 -47.4 -54.8 70 -99 SPO 1997 10 20 07 34 92 3.7 -9 670.90 -57.0 -47.2 -54.8 69 -99 SPO 1997 10 20 07 35 92 3.7 -9 670.90 -57.0 -47.2 -54.7 70 -99 SPO 1997 10 20 07 36 91 3.7 -9 670.90 -57.0 -47.1 -54.7 70 -99 SPO 1997 10 20 07 37 92 3.7 -9 670.90 -57.0 -47.2 -54.7 69 -99 SPO 1997 10 20 07 38 93 3.6 -9 670.90 -57.0 -47.4 -54.7 68 -99 SPO 1997 10 20 07 39 93 3.7 -9 670.90 -57.0 -47.6 -54.8 68 -99 SPO 1997 10 20 07 40 94 3.7 -9 670.90 -57.0 -47.7 -54.8 68 -99 SPO 1997 10 20 07 41 95 3.7 -9 670.90 -57.0 -47.8 -54.8 69 -99 SPO 1997 10 20 07 42 96 3.6 -9 670.90 -57.1 -47.9 -54.8 71 -99 SPO 1997 10 20 07 43 97 3.5 -9 670.90 -57.1 -48.0 -54.8 71 -99 SPO 1997 10 20 07 44 99 3.5 -9 670.90 -57.1 -48.3 -54.8 71 -99 SPO 1997 10 20 07 45 101 3.5 -9 670.90 -57.1 -48.4 -54.8 71 -99 SPO 1997 10 20 07 46 102 3.5 -9 670.90 -57.1 -48.5 -54.9 70 -99 SPO 1997 10 20 07 47 102 3.5 -9 670.90 -57.1 -48.4 -54.9 70 -99 SPO 1997 10 20 07 48 102 3.5 -9 670.90 -57.1 -48.2 -54.9 71 -99 SPO 1997 10 20 07 49 102 3.5 -9 670.90 -57.1 -47.8 -54.9 71 -99 SPO 1997 10 20 07 50 103 3.5 -9 670.90 -57.1 -47.6 -54.9 70 -99 SPO 1997 10 20 07 51 103 3.5 -9 670.90 -57.1 -47.4 -55.0 69 -99 SPO 1997 10 20 07 52 103 3.5 -9 670.90 -57.1 -47.2 -55.0 69 -99 SPO 1997 10 20 07 53 101 3.5 -9 670.80 -57.1 -47.3 -55.0 68 -99 SPO 1997 10 20 07 54 100 3.5 -9 670.80 -57.1 -47.1 -54.9 69 -99 SPO 1997 10 20 07 55 100 3.6 -9 670.80 -57.0 -47.1 -54.8 68 -99 SPO 1997 10 20 07 56 100 3.5 -9 670.80 -57.0 -47.2 -54.7 69 -99 SPO 1997 10 20 07 57 102 3.6 -9 670.80 -57.0 -47.2 -54.7 69 -99 SPO 1997 10 20 07 58 104 3.6 -9 670.80 -56.9 -47.2 -54.8 69 -99 SPO 1997 10 20 07 59 104 3.7 -9 670.80 -57.0 -47.5 -55.0 70 -99 SPO 1997 10 20 08 00 104 3.7 -9 670.80 -57.0 -47.6 -54.9 70 0 SPO 1997 10 20 08 01 105 3.7 -9 670.80 -57.0 -47.6 -55.0 70 -99 SPO 1997 10 20 08 02 107 3.7 -9 670.80 -57.0 -47.9 -55.1 70 -99 SPO 1997 10 20 08 03 109 3.7 -9 670.80 -57.0 -48.2 -55.2 70 -99 SPO 1997 10 20 08 04 109 3.8 -9 670.80 -57.0 -48.5 -55.4 69 -99 SPO 1997 10 20 08 05 108 3.8 -9 670.80 -57.0 -48.5 -55.4 69 -99 SPO 1997 10 20 08 06 108 3.8 -9 670.80 -57.0 -48.2 -55.4 68 -99 SPO 1997 10 20 08 07 108 3.7 -9 670.80 -57.0 -48.0 -55.4 68 -99 SPO 1997 10 20 08 08 108 3.6 -9 670.80 -56.9 -47.9 -55.4 68 -99 SPO 1997 10 20 08 09 107 3.5 -9 670.80 -56.9 -47.8 -55.4 69 -99 SPO 1997 10 20 08 10 106 3.5 -9 670.80 -56.9 -47.8 -55.3 69 -99 SPO 1997 10 20 08 11 105 3.4 -9 670.80 -56.9 -47.6 -55.2 69 -99 SPO 1997 10 20 08 12 106 3.4 -9 670.80 -56.9 -47.6 -55.2 70 -99 SPO 1997 10 20 08 13 108 3.3 -9 670.80 -56.9 -47.8 -55.4 70 -99 SPO 1997 10 20 08 14 111 3.3 -9 670.80 -57.0 -48.0 -55.6 71 -99 SPO 1997 10 20 08 15 112 3.3 -9 670.80 -57.1 -48.2 -55.8 71 -99 SPO 1997 10 20 08 16 111 3.4 -9 670.80 -57.1 -48.3 -55.8 72 -99 SPO 1997 10 20 08 17 110 3.5 -9 670.80 -57.1 -48.1 -55.9 71 -99 SPO 1997 10 20 08 18 109 3.5 -9 670.80 -57.2 -47.8 -55.9 72 -99 SPO 1997 10 20 08 19 109 3.5 -9 670.80 -57.2 -47.6 -55.9 71 -99 SPO 1997 10 20 08 20 108 3.5 -9 670.80 -57.2 -47.4 -55.9 70 -99 SPO 1997 10 20 08 21 109 3.6 -9 670.80 -57.1 -47.4 -55.8 69 -99 SPO 1997 10 20 08 22 111 3.6 -9 670.80 -57.1 -47.6 -55.9 69 -99 SPO 1997 10 20 08 23 113 3.6 -9 670.80 -57.1 -47.9 -55.9 69 -99 SPO 1997 10 20 08 24 114 3.6 -9 670.80 -57.1 -48.0 -55.9 69 -99 SPO 1997 10 20 08 25 115 3.6 -9 670.80 -57.1 -48.0 -55.9 70 -99 SPO 1997 10 20 08 26 116 3.6 -9 670.80 -57.1 -47.8 -55.9 70 -99 SPO 1997 10 20 08 27 117 3.7 -9 670.80 -57.1 -47.8 -55.9 71 -99 SPO 1997 10 20 08 28 117 3.8 -9 670.80 -57.1 -47.6 -55.9 71 -99 SPO 1997 10 20 08 29 117 3.8 -9 670.80 -57.1 -47.7 -56.0 71 -99 SPO 1997 10 20 08 30 118 3.9 -9 670.80 -57.1 -48.0 -56.0 71 -99 SPO 1997 10 20 08 31 118 3.9 -9 670.70 -57.2 -48.2 -56.1 71 -99 SPO 1997 10 20 08 32 115 3.8 -9 670.70 -57.2 -48.2 -56.1 71 -99 SPO 1997 10 20 08 33 114 3.8 -9 670.70 -57.2 -48.0 -56.1 70 -99 SPO 1997 10 20 08 34 113 3.9 -9 670.70 -57.2 -47.7 -56.1 70 -99 SPO 1997 10 20 08 35 112 3.9 -9 670.70 -57.2 -47.3 -56.1 71 -99 SPO 1997 10 20 08 36 111 3.9 -9 670.60 -57.2 -47.3 -56.1 71 -99 SPO 1997 10 20 08 37 109 4.0 -9 670.60 -57.2 -47.2 -56.1 71 -99 SPO 1997 10 20 08 38 107 3.9 -9 670.60 -57.2 -47.2 -56.0 71 -99 SPO 1997 10 20 08 39 105 4.0 -9 670.60 -57.2 -47.2 -56.0 72 -99 SPO 1997 10 20 08 40 103 4.0 -9 670.60 -57.2 -46.9 -55.8 72 -99 SPO 1997 10 20 08 41 102 4.0 -9 670.60 -57.1 -46.8 -55.8 71 -99 SPO 1997 10 20 08 42 102 4.1 -9 670.60 -57.1 -46.7 -55.8 71 -99 SPO 1997 10 20 08 43 101 4.1 -9 670.60 -57.1 -46.3 -55.8 70 -99 SPO 1997 10 20 08 44 101 4.2 -9 670.50 -57.1 -46.2 -55.7 69 -99 SPO 1997 10 20 08 45 100 4.1 -9 670.50 -57.1 -46.3 -55.7 69 -99 SPO 1997 10 20 08 46 100 4.1 -9 670.50 -57.1 -46.4 -55.7 69 -99 SPO 1997 10 20 08 47 99 4.2 -9 670.50 -57.1 -46.4 -55.7 69 -99 SPO 1997 10 20 08 48 98 4.2 -9 670.50 -57.1 -46.4 -55.6 70 -99 SPO 1997 10 20 08 49 96 4.2 -9 670.50 -57.0 -46.2 -55.4 70 -99 SPO 1997 10 20 08 50 95 4.2 -9 670.50 -57.0 -46.2 -55.3 70 -99 SPO 1997 10 20 08 51 95 4.2 -9 670.50 -57.0 -46.2 -55.2 70 -99 SPO 1997 10 20 08 52 95 4.1 -9 670.50 -57.0 -46.0 -55.2 70 -99 SPO 1997 10 20 08 53 96 4.1 -9 670.50 -57.0 -46.0 -55.3 70 -99 SPO 1997 10 20 08 54 97 4.1 -9 670.50 -56.9 -46.2 -55.4 70 -99 SPO 1997 10 20 08 55 98 4.1 -9 670.50 -57.0 -46.2 -55.5 71 -99 SPO 1997 10 20 08 56 99 4.1 -9 670.50 -57.0 -46.4 -55.6 70 -99 SPO 1997 10 20 08 57 99 4.1 -9 670.50 -57.0 -46.6 -55.6 70 -99 SPO 1997 10 20 08 58 98 4.1 -9 670.50 -57.0 -46.8 -55.6 70 -99 SPO 1997 10 20 08 59 98 4.1 -9 670.50 -57.0 -47.0 -55.5 70 -99 SPO 1997 10 20 09 00 98 4.1 -9 670.50 -56.9 -47.2 -55.5 69 0 SPO 1997 10 20 09 01 99 4.0 -9 670.50 -56.9 -47.4 -55.5 70 -99 SPO 1997 10 20 09 02 100 3.8 -9 670.40 -57.0 -47.5 -55.5 71 -99 SPO 1997 10 20 09 03 101 3.9 -9 670.40 -57.0 -47.6 -55.6 71 -99 SPO 1997 10 20 09 04 103 3.9 -9 670.50 -57.0 -47.8 -55.7 71 -99 SPO 1997 10 20 09 05 105 3.9 -9 670.50 -57.1 -47.9 -55.9 73 -99 SPO 1997 10 20 09 06 106 3.9 -9 670.50 -57.1 -48.1 -56.0 73 -99 SPO 1997 10 20 09 07 105 4.0 -9 670.50 -57.1 -48.2 -56.0 72 -99 SPO 1997 10 20 09 08 104 4.0 -9 670.40 -57.0 -48.1 -55.9 70 -99 SPO 1997 10 20 09 09 104 4.0 -9 670.40 -57.0 -48.1 -55.8 70 -99 SPO 1997 10 20 09 10 103 4.0 -9 670.40 -57.0 -48.1 -55.8 69 -99 SPO 1997 10 20 09 11 102 4.1 -9 670.40 -57.0 -48.0 -55.7 69 -99 SPO 1997 10 20 09 12 102 4.1 -9 670.40 -57.0 -48.0 -55.7 70 -99 SPO 1997 10 20 09 13 102 4.1 -9 670.40 -57.0 -48.0 -55.7 70 -99 SPO 1997 10 20 09 14 100 4.1 -9 670.40 -57.1 -47.8 -55.6 71 -99 SPO 1997 10 20 09 15 100 4.1 -9 670.40 -57.0 -47.7 -55.5 71 -99 SPO 1997 10 20 09 16 99 4.0 -9 670.40 -57.0 -47.5 -55.4 71 -99 SPO 1997 10 20 09 17 99 4.0 -9 670.40 -57.0 -47.3 -55.3 71 -99 SPO 1997 10 20 09 18 98 4.0 -9 670.40 -56.9 -47.1 -55.2 70 -99 SPO 1997 10 20 09 19 98 4.0 -9 670.40 -56.9 -46.9 -55.2 70 -99 SPO 1997 10 20 09 20 98 4.0 -9 670.40 -56.9 -46.6 -55.2 70 -99 SPO 1997 10 20 09 21 97 4.0 -9 670.30 -56.9 -46.6 -55.2 70 -99 SPO 1997 10 20 09 22 98 4.0 -9 670.30 -56.9 -46.4 -55.1 69 -99 SPO 1997 10 20 09 23 100 4.0 -9 670.30 -56.9 -46.2 -55.2 69 -99 SPO 1997 10 20 09 24 102 4.0 -9 670.30 -56.9 -46.4 -55.4 70 -99 SPO 1997 10 20 09 25 102 3.9 -9 670.30 -56.9 -46.6 -55.5 71 -99 SPO 1997 10 20 09 26 101 4.0 -9 670.30 -57.0 -46.4 -55.6 71 -99 SPO 1997 10 20 09 27 98 4.1 -9 670.30 -57.0 -45.8 -55.4 71 -99 SPO 1997 10 20 09 28 95 4.1 -9 670.30 -57.0 -45.3 -55.3 71 -99 SPO 1997 10 20 09 29 94 4.1 -9 670.20 -56.9 -45.1 -55.2 71 -99 SPO 1997 10 20 09 30 94 4.2 -9 670.20 -57.0 -45.3 -55.2 72 -99 SPO 1997 10 20 09 31 95 4.1 -9 670.20 -57.0 -45.5 -55.2 72 -99 SPO 1997 10 20 09 32 96 4.1 -9 670.20 -57.0 -45.3 -55.3 72 -99 SPO 1997 10 20 09 33 97 4.1 -9 670.20 -57.1 -45.5 -55.4 72 -99 SPO 1997 10 20 09 34 98 4.1 -9 670.20 -57.1 -45.6 -55.4 71 -99 SPO 1997 10 20 09 35 99 4.0 -9 670.20 -57.1 -45.8 -55.5 71 -99 SPO 1997 10 20 09 36 101 4.1 -9 670.20 -57.1 -46.0 -55.6 70 -99 SPO 1997 10 20 09 37 101 4.1 -9 670.20 -57.1 -46.1 -55.7 70 -99 SPO 1997 10 20 09 38 99 4.1 -9 670.20 -57.2 -45.8 -55.7 72 -99 SPO 1997 10 20 09 39 99 4.1 -9 670.20 -57.2 -45.6 -55.6 72 -99 SPO 1997 10 20 09 40 99 4.1 -9 670.20 -57.2 -45.6 -55.5 72 -99 SPO 1997 10 20 09 41 100 4.2 -9 670.30 -57.2 -45.8 -55.6 72 -99 SPO 1997 10 20 09 42 101 4.1 -9 670.30 -57.2 -46.2 -55.7 71 -99 SPO 1997 10 20 09 43 103 4.1 -9 670.30 -57.2 -46.6 -55.8 71 -99 SPO 1997 10 20 09 44 102 4.1 -9 670.30 -57.2 -46.9 -55.9 71 -99 SPO 1997 10 20 09 45 101 4.1 -9 670.30 -57.2 -46.8 -55.8 70 -99 SPO 1997 10 20 09 46 101 4.1 -9 670.30 -57.1 -46.4 -55.7 69 -99 SPO 1997 10 20 09 47 102 4.1 -9 670.30 -57.1 -46.0 -55.7 69 -99 SPO 1997 10 20 09 48 104 4.1 -9 670.30 -57.1 -45.9 -55.8 69 -99 SPO 1997 10 20 09 49 107 4.0 -9 670.30 -57.2 -46.1 -55.9 70 -99 SPO 1997 10 20 09 50 109 4.0 -9 670.30 -57.2 -46.3 -56.0 71 -99 SPO 1997 10 20 09 51 111 4.1 -9 670.30 -57.1 -46.6 -56.1 70 -99 SPO 1997 10 20 09 52 112 4.1 -9 670.30 -57.1 -46.8 -56.0 71 -99 SPO 1997 10 20 09 53 112 4.1 -9 670.30 -57.1 -47.0 -56.0 71 -99 SPO 1997 10 20 09 54 112 4.0 -9 670.30 -57.1 -47.2 -56.0 71 -99 SPO 1997 10 20 09 55 113 4.0 -9 670.30 -57.2 -47.3 -56.1 73 -99 SPO 1997 10 20 09 56 115 3.9 -9 670.30 -57.2 -47.4 -56.2 74 -99 SPO 1997 10 20 09 57 115 3.9 -9 670.30 -57.1 -47.4 -56.2 72 -99 SPO 1997 10 20 09 58 119 4.0 -9 670.30 -57.1 -47.5 -56.1 72 -99 SPO 1997 10 20 09 59 123 4.1 -9 670.30 -57.0 -47.8 -56.1 70 -99 SPO 1997 10 20 10 00 124 4.3 -9 670.30 -57.0 -48.2 -56.0 69 0 SPO 1997 10 20 10 01 122 4.3 -9 670.30 -57.0 -48.5 -56.0 70 -99 SPO 1997 10 20 10 02 120 4.3 -9 670.30 -57.0 -48.5 -56.1 71 -99 SPO 1997 10 20 10 03 118 4.2 -9 670.30 -57.2 -48.3 -56.2 73 -99 SPO 1997 10 20 10 04 115 4.2 -9 670.30 -57.2 -48.0 -56.3 72 -99 SPO 1997 10 20 10 05 113 4.3 -9 670.30 -57.2 -47.8 -56.3 72 -99 SPO 1997 10 20 10 06 113 4.3 -9 670.30 -57.2 -47.6 -56.2 72 -99 SPO 1997 10 20 10 07 114 4.3 -9 670.20 -57.1 -47.6 -56.2 71 -99 SPO 1997 10 20 10 08 113 4.3 -9 670.20 -57.1 -47.7 -56.2 71 -99 SPO 1997 10 20 10 09 114 4.3 -9 670.20 -57.1 -47.8 -56.2 71 -99 SPO 1997 10 20 10 10 114 4.3 -9 670.20 -57.2 -48.0 -56.3 72 -99 SPO 1997 10 20 10 11 113 4.4 -9 670.20 -57.2 -47.8 -56.3 72 -99 SPO 1997 10 20 10 12 113 4.4 -9 670.20 -57.3 -47.6 -56.4 72 -99 SPO 1997 10 20 10 13 115 4.3 -9 670.20 -57.4 -47.7 -56.4 72 -99 SPO 1997 10 20 10 14 116 4.4 -9 670.20 -57.5 -47.8 -56.5 72 -99 SPO 1997 10 20 10 15 118 4.2 -9 670.20 -57.6 -47.9 -56.6 73 -99 SPO 1997 10 20 10 16 114 4.3 -9 670.20 -57.7 -47.8 -56.8 73 -99 SPO 1997 10 20 10 17 112 4.4 -9 670.20 -57.8 -47.5 -56.8 74 -99 SPO 1997 10 20 10 18 112 4.4 -9 670.10 -57.8 -47.3 -56.8 73 -99 SPO 1997 10 20 10 19 111 4.4 -9 670.10 -57.8 -47.2 -56.8 72 -99 SPO 1997 10 20 10 20 112 4.4 -9 670.20 -57.8 -47.2 -56.9 72 -99 SPO 1997 10 20 10 21 113 4.3 -9 670.20 -57.8 -47.4 -56.9 70 -99 SPO 1997 10 20 10 22 113 4.3 -9 670.10 -57.8 -47.4 -56.9 69 -99 SPO 1997 10 20 10 23 112 4.3 -9 670.10 -57.8 -47.2 -56.9 69 -99 SPO 1997 10 20 10 24 111 4.2 -9 670.10 -57.8 -46.9 -56.9 68 -99 SPO 1997 10 20 10 25 111 4.2 -9 670.10 -57.8 -46.7 -56.9 68 -99 SPO 1997 10 20 10 26 110 4.1 -9 670.10 -57.8 -46.6 -56.9 68 -99 SPO 1997 10 20 10 27 109 4.1 -9 670.10 -57.8 -46.5 -56.9 68 -99 SPO 1997 10 20 10 28 110 4.1 -9 670.10 -57.8 -46.7 -56.9 68 -99 SPO 1997 10 20 10 29 109 4.1 -9 670.00 -57.8 -46.8 -56.9 69 -99 SPO 1997 10 20 10 30 107 4.1 -9 670.00 -57.9 -46.6 -56.9 70 -99 SPO 1997 10 20 10 31 106 4.2 -9 670.00 -57.9 -46.3 -56.9 71 -99 SPO 1997 10 20 10 32 105 4.1 -9 670.00 -57.9 -46.0 -56.9 70 -99 SPO 1997 10 20 10 33 104 4.1 -9 670.00 -57.9 -45.8 -56.9 70 -99 SPO 1997 10 20 10 34 105 4.0 -9 670.00 -57.9 -45.8 -56.9 70 -99 SPO 1997 10 20 10 35 106 4.0 -9 670.00 -57.9 -46.0 -57.0 70 -99 SPO 1997 10 20 10 36 109 3.9 -9 670.00 -57.9 -46.6 -57.1 70 -99 SPO 1997 10 20 10 37 110 3.9 -9 670.00 -58.0 -47.1 -57.1 71 -99 SPO 1997 10 20 10 38 107 3.9 -9 670.00 -58.0 -47.2 -57.2 70 -99 SPO 1997 10 20 10 39 106 3.8 -9 670.00 -58.0 -47.1 -57.1 69 -99 SPO 1997 10 20 10 40 106 3.8 -9 670.00 -58.0 -47.0 -57.1 69 -99 SPO 1997 10 20 10 41 104 3.8 -9 670.00 -58.0 -47.0 -57.1 69 -99 SPO 1997 10 20 10 42 104 3.8 -9 670.00 -58.0 -46.9 -57.1 69 -99 SPO 1997 10 20 10 43 106 3.7 -9 670.00 -58.0 -47.0 -57.1 69 -99 SPO 1997 10 20 10 44 108 3.7 -9 670.00 -58.0 -47.0 -57.1 69 -99 SPO 1997 10 20 10 45 108 3.8 -9 670.00 -58.0 -46.9 -57.1 69 -99 SPO 1997 10 20 10 46 109 3.7 -9 670.00 -57.9 -46.8 -57.0 68 -99 SPO 1997 10 20 10 47 107 3.7 -9 670.00 -57.8 -46.9 -57.0 68 -99 SPO 1997 10 20 10 48 105 3.7 -9 670.00 -57.8 -46.8 -56.9 68 -99 SPO 1997 10 20 10 49 103 3.7 -9 670.00 -57.8 -46.6 -56.9 68 -99 SPO 1997 10 20 10 50 102 3.7 -9 670.00 -57.7 -46.4 -56.8 67 -99 SPO 1997 10 20 10 51 102 3.7 -9 669.90 -57.6 -46.2 -56.7 66 -99 SPO 1997 10 20 10 52 102 3.7 -9 669.90 -57.6 -45.8 -56.6 67 -99 SPO 1997 10 20 10 53 102 3.7 -9 669.90 -57.5 -45.7 -56.6 67 -99 SPO 1997 10 20 10 54 103 3.7 -9 669.90 -57.5 -45.6 -56.5 67 -99 SPO 1997 10 20 10 55 103 3.7 -9 669.90 -57.5 -45.4 -56.5 68 -99 SPO 1997 10 20 10 56 103 3.6 -9 669.90 -57.5 -45.2 -56.5 69 -99 SPO 1997 10 20 10 57 104 3.6 -9 669.90 -57.4 -45.1 -56.5 68 -99 SPO 1997 10 20 10 58 103 3.5 -9 669.90 -57.4 -44.9 -56.4 69 -99 SPO 1997 10 20 10 59 102 3.5 -9 669.90 -57.3 -44.6 -56.4 68 -99 SPO 1997 10 20 11 00 101 3.5 -9 669.90 -57.3 -44.5 -56.3 69 0 SPO 1997 10 20 11 01 102 3.4 -9 669.90 -57.3 -44.6 -56.3 69 -99 SPO 1997 10 20 11 02 104 3.4 -9 669.90 -57.4 -45.1 -56.4 70 -99 SPO 1997 10 20 11 03 106 3.4 -9 669.90 -57.4 -45.4 -56.4 70 -99 SPO 1997 10 20 11 04 108 3.4 -9 669.90 -57.5 -45.6 -56.4 70 -99 SPO 1997 10 20 11 05 108 3.5 -9 669.90 -57.4 -45.6 -56.5 69 -99 SPO 1997 10 20 11 06 105 3.6 -9 669.80 -57.4 -45.2 -56.4 70 -99 SPO 1997 10 20 11 07 102 3.6 -9 669.80 -57.3 -44.9 -56.4 69 -99 SPO 1997 10 20 11 08 100 3.6 -9 669.80 -57.2 -44.7 -56.3 69 -99 SPO 1997 10 20 11 09 101 3.5 -9 669.80 -57.2 -44.8 -56.2 70 -99 SPO 1997 10 20 11 10 103 3.4 -9 669.80 -57.2 -45.0 -56.2 70 -99 SPO 1997 10 20 11 11 104 3.4 -9 669.80 -57.2 -45.4 -56.3 70 -99 SPO 1997 10 20 11 12 104 3.5 -9 669.80 -57.3 -45.2 -56.3 71 -99 SPO 1997 10 20 11 13 103 3.4 -9 669.80 -57.3 -44.9 -56.2 71 -99 SPO 1997 10 20 11 14 103 3.4 -9 669.80 -57.3 -44.8 -56.2 71 -99 SPO 1997 10 20 11 15 102 3.3 -9 669.80 -57.2 -44.6 -56.2 70 -99 SPO 1997 10 20 11 16 101 3.2 -9 669.80 -57.2 -44.8 -56.2 70 -99 SPO 1997 10 20 11 17 98 3.4 -9 669.70 -57.2 -44.4 -56.3 70 -99 SPO 1997 10 20 11 18 97 3.4 -9 669.70 -57.3 -44.1 -56.3 71 -99 SPO 1997 10 20 11 19 96 3.4 -9 669.70 -57.3 -43.9 -56.3 71 -99 SPO 1997 10 20 11 20 96 3.4 -9 669.70 -57.3 -43.9 -56.3 71 -99 SPO 1997 10 20 11 21 96 3.3 -9 669.70 -57.3 -43.8 -56.4 71 -99 SPO 1997 10 20 11 22 97 3.2 -9 669.70 -57.4 -44.0 -56.4 72 -99 SPO 1997 10 20 11 23 97 3.2 -9 669.70 -57.4 -44.1 -56.3 72 -99 SPO 1997 10 20 11 24 93 3.4 -9 669.60 -57.3 -43.9 -56.3 71 -99 SPO 1997 10 20 11 25 90 3.7 -9 669.60 -57.2 -43.6 -56.1 71 -99 SPO 1997 10 20 11 26 89 3.7 -9 669.60 -57.2 -43.7 -55.9 71 -99 SPO 1997 10 20 11 27 88 3.7 -9 669.60 -57.2 -43.7 -55.9 71 -99 SPO 1997 10 20 11 28 87 3.8 -9 669.60 -57.1 -43.8 -55.8 69 -99 SPO 1997 10 20 11 29 84 4.0 -9 669.50 -57.1 -43.9 -55.6 69 -99 SPO 1997 10 20 11 30 82 4.2 -9 669.50 -57.0 -44.0 -55.4 68 -99 SPO 1997 10 20 11 31 82 4.3 -9 669.50 -57.0 -44.0 -55.1 68 -99 SPO 1997 10 20 11 32 81 4.2 -9 669.50 -56.9 -44.1 -55.0 69 -99 SPO 1997 10 20 11 33 82 4.0 -9 669.50 -56.9 -44.1 -54.9 69 -99 SPO 1997 10 20 11 34 84 3.9 -9 669.50 -56.9 -44.1 -54.9 70 -99 SPO 1997 10 20 11 35 85 3.9 -9 669.50 -57.0 -44.2 -55.0 71 -99 SPO 1997 10 20 11 36 85 3.9 -9 669.50 -57.0 -44.3 -55.1 72 -99 SPO 1997 10 20 11 37 85 3.9 -9 669.50 -57.0 -44.3 -55.0 71 -99 SPO 1997 10 20 11 38 85 3.9 -9 669.50 -57.1 -44.2 -55.0 72 -99 SPO 1997 10 20 11 39 86 3.8 -9 669.50 -57.1 -44.2 -55.0 72 -99 SPO 1997 10 20 11 40 88 3.8 -9 669.40 -57.1 -44.4 -55.0 71 -99 SPO 1997 10 20 11 41 88 3.8 -9 669.50 -57.1 -44.3 -55.1 71 -99 SPO 1997 10 20 11 42 90 3.8 -9 669.40 -57.1 -44.2 -55.1 71 -99 SPO 1997 10 20 11 43 91 3.8 -9 669.50 -57.1 -44.0 -55.1 70 -99 SPO 1997 10 20 11 44 92 3.7 -9 669.50 -57.0 -44.0 -55.1 68 -99 SPO 1997 10 20 11 45 92 3.7 -9 669.50 -57.0 -44.1 -55.1 68 -99 SPO 1997 10 20 11 46 92 3.7 -9 669.40 -57.0 -44.2 -55.1 68 -99 SPO 1997 10 20 11 47 90 3.7 -9 669.40 -57.0 -44.2 -55.0 69 -99 SPO 1997 10 20 11 48 89 3.7 -9 669.40 -57.0 -44.1 -55.0 70 -99 SPO 1997 10 20 11 49 89 3.8 -9 669.40 -57.0 -43.9 -55.0 71 -99 SPO 1997 10 20 11 50 88 3.8 -9 669.40 -57.1 -43.6 -55.1 71 -99 SPO 1997 10 20 11 51 88 3.9 -9 669.40 -57.1 -43.6 -55.1 71 -99 SPO 1997 10 20 11 52 88 3.8 -9 669.40 -57.1 -43.4 -55.1 71 -99 SPO 1997 10 20 11 53 88 3.7 -9 669.40 -57.0 -43.3 -55.1 71 -99 SPO 1997 10 20 11 54 90 3.7 -9 669.40 -57.0 -43.3 -55.1 71 -99 SPO 1997 10 20 11 55 90 3.8 -9 669.30 -57.0 -43.4 -55.1 71 -99 SPO 1997 10 20 11 56 91 3.8 -9 669.40 -56.9 -43.5 -55.1 69 -99 SPO 1997 10 20 11 57 93 3.7 -9 669.40 -56.9 -43.6 -55.2 68 -99 SPO 1997 10 20 11 58 94 3.6 -9 669.40 -56.8 -43.8 -55.2 68 -99 SPO 1997 10 20 11 59 95 3.6 -9 669.40 -56.8 -44.0 -55.3 68 -99 SPO 1997 10 20 12 00 96 3.5 -9 669.40 -56.7 -44.0 -55.3 68 0 SPO 1997 10 20 12 01 96 3.6 -9 669.40 -56.7 -44.2 -55.3 68 -99 SPO 1997 10 20 12 02 96 3.6 -9 669.30 -56.7 -44.2 -55.3 69 -99 SPO 1997 10 20 12 03 96 3.6 -9 669.30 -56.6 -44.0 -55.2 69 -99 SPO 1997 10 20 12 04 96 3.5 -9 669.30 -56.6 -43.6 -55.2 70 -99 SPO 1997 10 20 12 05 98 3.5 -9 669.30 -56.6 -43.4 -55.3 70 -99 SPO 1997 10 20 12 06 99 3.6 -9 669.30 -56.6 -43.4 -55.4 70 -99 SPO 1997 10 20 12 07 99 3.5 -9 669.30 -56.6 -43.5 -55.4 70 -99 SPO 1997 10 20 12 08 99 3.6 -9 669.30 -56.6 -43.7 -55.4 71 -99 SPO 1997 10 20 12 09 99 3.6 -9 669.30 -56.6 -43.9 -55.2 71 -99 SPO 1997 10 20 12 10 99 3.5 -9 669.30 -56.6 -44.0 -55.2 71 -99 SPO 1997 10 20 12 11 99 3.5 -9 669.30 -56.6 -44.1 -55.2 71 -99 SPO 1997 10 20 12 12 98 3.5 -9 669.30 -56.6 -44.1 -55.2 71 -99 SPO 1997 10 20 12 13 98 3.4 -9 669.30 -56.5 -44.2 -55.2 70 -99 SPO 1997 10 20 12 14 100 3.4 -9 669.30 -56.5 -44.6 -55.2 70 -99 SPO 1997 10 20 12 15 101 3.4 -9 669.30 -56.4 -45.0 -55.4 70 -99 SPO 1997 10 20 12 16 103 3.4 -9 669.30 -56.4 -45.2 -55.4 71 -99 SPO 1997 10 20 12 17 104 3.3 -9 669.30 -56.4 -45.6 -55.5 71 -99 SPO 1997 10 20 12 18 104 3.3 -9 669.30 -56.4 -45.8 -55.5 72 -99 SPO 1997 10 20 12 19 105 3.4 -9 669.30 -56.4 -45.8 -55.5 72 -99 SPO 1997 10 20 12 20 106 3.4 -9 669.30 -56.3 -46.0 -55.5 71 -99 SPO 1997 10 20 12 21 108 3.4 -9 669.30 -56.3 -46.2 -55.5 71 -99 SPO 1997 10 20 12 22 109 3.3 -9 669.30 -56.3 -46.5 -55.5 72 -99 SPO 1997 10 20 12 23 108 3.5 -9 669.20 -56.3 -46.4 -55.5 72 -99 SPO 1997 10 20 12 24 107 3.5 -9 669.30 -56.2 -46.0 -55.4 71 -99 SPO 1997 10 20 12 25 111 3.5 -9 669.30 -56.2 -46.2 -55.5 71 -99 SPO 1997 10 20 12 26 113 3.5 -9 669.30 -56.2 -47.0 -55.5 71 -99 SPO 1997 10 20 12 27 113 3.5 -9 669.30 -56.1 -47.2 -55.4 70 -99 SPO 1997 10 20 12 28 110 3.5 -9 669.20 -56.0 -46.8 -55.2 70 -99 SPO 1997 10 20 12 29 108 3.4 -9 669.20 -55.8 -46.2 -55.1 70 -99 SPO 1997 10 20 12 30 108 3.3 -9 669.20 -55.8 -46.1 -55.0 71 -99 SPO 1997 10 20 12 31 109 3.3 -9 669.20 -55.8 -46.2 -55.0 72 -99 SPO 1997 10 20 12 32 112 3.3 -9 669.20 -55.8 -46.8 -55.1 72 -99 SPO 1997 10 20 12 33 113 3.4 -9 669.20 -55.7 -47.2 -55.0 72 -99 SPO 1997 10 20 12 34 111 3.4 -9 669.20 -55.6 -47.0 -55.0 71 -99 SPO 1997 10 20 12 35 111 3.4 -9 669.20 -55.7 -46.5 -55.0 73 -99 SPO 1997 10 20 12 36 115 3.4 -9 669.20 -55.7 -46.4 -55.0 73 -99 SPO 1997 10 20 12 37 120 3.4 -9 669.20 -55.6 -47.3 -55.0 71 -99 SPO 1997 10 20 12 38 118 3.2 -9 669.20 -55.4 -47.7 -54.8 70 -99 SPO 1997 10 20 12 39 116 3.2 -9 669.20 -55.5 -47.2 -54.9 71 -99 SPO 1997 10 20 12 40 118 3.3 -9 669.20 -55.6 -47.2 -54.9 72 -99 SPO 1997 10 20 12 41 118 3.3 -9 669.20 -55.5 -47.8 -54.9 72 -99 SPO 1997 10 20 12 42 114 3.3 -9 669.20 -55.6 -47.8 -54.9 73 -99 SPO 1997 10 20 12 43 117 3.3 -9 669.20 -55.6 -47.6 -54.9 73 -99 SPO 1997 10 20 12 44 119 3.4 -9 669.20 -55.5 -48.4 -54.9 72 -99 SPO 1997 10 20 12 45 118 3.5 -9 669.20 -55.4 -48.6 -54.9 72 -99 SPO 1997 10 20 12 46 119 3.5 -9 669.20 -55.2 -48.8 -54.8 71 -99 SPO 1997 10 20 12 47 116 3.5 -9 669.20 -55.3 -48.8 -54.8 73 -99 SPO 1997 10 20 12 48 113 3.6 -9 669.20 -55.6 -47.7 -55.0 77 -99 SPO 1997 10 20 12 49 113 3.4 -9 669.20 -55.7 -47.6 -55.0 75 -99 SPO 1997 10 20 12 50 114 3.3 -9 669.20 -55.7 -48.5 -55.0 75 -99 SPO 1997 10 20 12 51 110 3.4 -9 669.20 -55.7 -47.8 -55.0 73 -99 SPO 1997 10 20 12 52 105 3.5 -9 669.10 -55.8 -46.7 -55.0 73 -99 SPO 1997 10 20 12 53 106 3.4 -9 669.20 -55.7 -46.1 -54.9 71 -99 SPO 1997 10 20 12 54 110 3.4 -9 669.20 -55.8 -46.2 -55.0 71 -99 SPO 1997 10 20 12 55 111 3.5 -9 669.10 -55.7 -46.4 -55.1 71 -99 SPO 1997 10 20 12 56 113 3.6 -9 669.20 -55.8 -46.6 -55.2 72 -99 SPO 1997 10 20 12 57 114 3.6 -9 669.20 -55.8 -47.1 -55.2 72 -99 SPO 1997 10 20 12 58 117 3.6 -9 669.20 -55.9 -47.8 -55.2 73 -99 SPO 1997 10 20 12 59 114 3.5 -9 669.10 -55.8 -48.8 -55.2 72 -99 SPO 1997 10 20 13 00 112 3.5 -9 669.10 -55.9 -48.1 -55.3 72 0 SPO 1997 10 20 13 01 111 3.5 -9 669.10 -55.9 -47.6 -55.3 71 -99 SPO 1997 10 20 13 02 111 3.4 -9 669.10 -55.8 -47.4 -55.2 70 -99 SPO 1997 10 20 13 03 110 3.5 -9 669.10 -55.9 -47.4 -55.2 71 -99 SPO 1997 10 20 13 04 107 3.6 -9 669.10 -55.9 -46.9 -55.2 69 -99 SPO 1997 10 20 13 05 105 3.7 -9 669.00 -55.8 -46.3 -55.1 68 -99 SPO 1997 10 20 13 06 103 3.7 -9 669.00 -55.8 -45.8 -55.0 68 -99 SPO 1997 10 20 13 07 101 3.7 -9 669.00 -55.7 -45.5 -54.8 68 -99 SPO 1997 10 20 13 08 100 3.7 -9 669.00 -55.8 -45.2 -54.7 69 -99 SPO 1997 10 20 13 09 101 3.7 -9 669.00 -55.8 -45.1 -54.7 69 -99 SPO 1997 10 20 13 10 101 3.7 -9 669.00 -55.8 -45.1 -54.8 70 -99 SPO 1997 10 20 13 11 103 3.7 -9 669.00 -55.7 -45.1 -54.8 69 -99 SPO 1997 10 20 13 12 106 3.6 -9 669.00 -55.7 -45.6 -54.9 70 -99 SPO 1997 10 20 13 13 109 3.5 -9 669.00 -55.7 -46.7 -55.0 70 -99 SPO 1997 10 20 13 14 108 3.5 -9 669.00 -55.8 -47.6 -55.1 70 -99 SPO 1997 10 20 13 15 110 3.5 -9 669.00 -55.8 -48.2 -55.1 70 -99 SPO 1997 10 20 13 16 115 3.3 -9 669.00 -55.6 -49.5 -55.1 68 -99 SPO 1997 10 20 13 17 118 3.3 -9 669.00 -55.4 -50.7 -54.9 66 -99 SPO 1997 10 20 13 18 118 3.3 -9 669.00 -55.6 -51.2 -55.0 68 -99 SPO 1997 10 20 13 19 119 3.3 -9 669.00 -55.7 -51.2 -55.2 69 -99 SPO 1997 10 20 13 20 119 3.4 -9 669.00 -55.6 -51.4 -55.1 68 -99 SPO 1997 10 20 13 21 118 3.4 -9 669.00 -55.6 -51.5 -55.1 69 -99 SPO 1997 10 20 13 22 116 3.3 -9 669.00 -55.6 -51.5 -55.1 69 -99 SPO 1997 10 20 13 23 115 3.3 -9 669.00 -55.6 -51.6 -55.1 70 -99 SPO 1997 10 20 13 24 110 3.4 -9 669.00 -55.8 -51.4 -55.2 70 -99 SPO 1997 10 20 13 25 106 3.5 -9 669.00 -55.8 -51.1 -55.2 70 -99 SPO 1997 10 20 13 26 102 3.5 -9 669.00 -55.8 -50.7 -55.1 69 -99 SPO 1997 10 20 13 27 99 3.6 -9 669.00 -55.7 -50.2 -55.0 68 -99 SPO 1997 10 20 13 28 99 3.7 -9 668.90 -55.7 -49.4 -54.8 68 -99 SPO 1997 10 20 13 29 99 3.7 -9 668.90 -55.7 -48.8 -54.8 68 -99 SPO 1997 10 20 13 30 100 3.7 -9 668.90 -55.6 -48.6 -54.8 67 -99 SPO 1997 10 20 13 31 100 3.7 -9 668.90 -55.6 -48.4 -54.8 67 -99 SPO 1997 10 20 13 32 100 3.8 -9 668.90 -55.6 -48.2 -54.7 67 -99 SPO 1997 10 20 13 33 99 3.9 -9 668.90 -55.5 -48.1 -54.7 66 -99 SPO 1997 10 20 13 34 101 3.9 -9 668.90 -55.5 -48.0 -54.7 67 -99 SPO 1997 10 20 13 35 104 3.9 -9 668.90 -55.5 -47.8 -54.8 68 -99 SPO 1997 10 20 13 36 108 3.9 -9 668.90 -55.6 -47.9 -55.0 69 -99 SPO 1997 10 20 13 37 115 3.7 -9 669.00 -55.4 -48.8 -54.9 67 -99 SPO 1997 10 20 13 38 121 3.7 -9 669.00 -55.0 -50.3 -54.5 65 -99 SPO 1997 10 20 13 39 117 3.7 -9 669.00 -54.8 -50.9 -54.4 64 -99 SPO 1997 10 20 13 40 111 3.8 -9 668.90 -55.0 -50.8 -54.6 67 -99 SPO 1997 10 20 13 41 110 3.8 -9 668.90 -55.5 -50.5 -55.0 71 -99 SPO 1997 10 20 13 42 109 3.8 -9 668.90 -55.7 -50.5 -55.1 72 -99 SPO 1997 10 20 13 43 108 3.8 -9 668.90 -55.8 -50.6 -55.2 71 -99 SPO 1997 10 20 13 44 108 3.8 -9 668.90 -55.9 -50.6 -55.2 70 -99 SPO 1997 10 20 13 45 105 3.8 -9 668.90 -55.9 -50.4 -55.3 68 -99 SPO 1997 10 20 13 46 106 3.8 -9 668.90 -55.9 -50.3 -55.3 68 -99 SPO 1997 10 20 13 47 106 3.8 -9 668.90 -56.0 -50.5 -55.3 68 -99 SPO 1997 10 20 13 48 106 3.8 -9 668.90 -55.9 -50.4 -55.3 67 -99 SPO 1997 10 20 13 49 108 3.8 -9 668.90 -55.9 -50.0 -55.2 67 -99 SPO 1997 10 20 13 50 111 3.8 -9 668.90 -55.9 -50.2 -55.2 67 -99 SPO 1997 10 20 13 51 118 3.6 -9 668.90 -55.5 -50.4 -55.0 65 -99 SPO 1997 10 20 13 52 118 3.7 -9 668.90 -54.9 -50.8 -54.4 62 -99 SPO 1997 10 20 13 53 111 3.7 -9 668.90 -54.8 -50.5 -54.4 62 -99 SPO 1997 10 20 13 54 106 3.7 -9 668.80 -55.4 -49.9 -54.8 69 -99 SPO 1997 10 20 13 55 105 3.6 -9 668.80 -55.7 -49.8 -55.0 71 -99 SPO 1997 10 20 13 56 107 3.6 -9 668.80 -55.7 -50.1 -55.0 70 -99 SPO 1997 10 20 13 57 108 3.6 -9 668.80 -55.6 -50.4 -55.0 67 -99 SPO 1997 10 20 13 58 108 3.5 -9 668.80 -55.7 -50.4 -55.0 67 -99 SPO 1997 10 20 13 59 108 3.5 -9 668.80 -55.6 -49.9 -55.0 66 -99 SPO 1997 10 20 14 00 109 3.6 -9 668.80 -55.6 -49.2 -55.0 66 0 SPO 1997 10 20 14 01 109 3.5 -9 668.80 -55.5 -49.0 -54.9 65 -99 SPO 1997 10 20 14 02 109 3.4 -9 668.80 -55.6 -49.4 -54.9 67 -99 SPO 1997 10 20 14 03 109 3.5 -9 668.80 -55.5 -49.8 -54.9 66 -99 SPO 1997 10 20 14 04 108 3.5 -9 668.70 -55.5 -49.7 -54.9 66 -99 SPO 1997 10 20 14 05 110 3.5 -9 668.70 -55.5 -49.4 -54.9 66 -99 SPO 1997 10 20 14 06 112 3.5 -9 668.70 -55.5 -49.6 -54.9 66 -99 SPO 1997 10 20 14 07 113 3.5 -9 668.70 -55.5 -50.0 -54.9 67 -99 SPO 1997 10 20 14 08 113 3.5 -9 668.70 -55.5 -50.3 -54.9 67 -99 SPO 1997 10 20 14 09 110 3.6 -9 668.70 -55.6 -50.3 -55.0 67 -99 SPO 1997 10 20 14 10 108 3.6 -9 668.70 -55.7 -50.1 -55.0 68 -99 SPO 1997 10 20 14 11 109 3.6 -9 668.70 -55.7 -49.7 -55.0 66 -99 SPO 1997 10 20 14 12 111 3.6 -9 668.70 -55.8 -49.5 -55.1 67 -99 SPO 1997 10 20 14 13 113 3.5 -9 668.70 -55.7 -49.8 -55.1 65 -99 SPO 1997 10 20 14 14 112 3.5 -9 668.70 -55.7 -50.2 -55.1 66 -99 SPO 1997 10 20 14 15 109 3.5 -9 668.70 -55.8 -50.2 -55.1 67 -99 SPO 1997 10 20 14 16 108 3.5 -9 668.70 -55.8 -50.1 -55.1 67 -99 SPO 1997 10 20 14 17 108 3.5 -9 668.70 -55.8 -50.1 -55.2 66 -99 SPO 1997 10 20 14 18 106 3.5 -9 668.60 -55.8 -50.1 -55.2 66 -99 SPO 1997 10 20 14 19 104 3.5 -9 668.60 -55.8 -49.9 -55.2 66 -99 SPO 1997 10 20 14 20 102 3.5 -9 668.60 -55.7 -49.5 -55.1 65 -99 SPO 1997 10 20 14 21 99 3.6 -9 668.60 -55.7 -48.9 -55.0 65 -99 SPO 1997 10 20 14 22 98 3.7 -9 668.60 -55.6 -48.2 -54.9 65 -99 SPO 1997 10 20 14 23 96 3.7 -9 668.60 -55.5 -47.8 -54.8 63 -99 SPO 1997 10 20 14 24 95 3.8 -9 668.60 -55.5 -47.6 -54.7 63 -99 SPO 1997 10 20 14 25 94 3.8 -9 668.60 -55.5 -47.5 -54.6 62 -99 SPO 1997 10 20 14 26 92 3.8 -9 668.60 -55.5 -47.3 -54.6 62 -99 SPO 1997 10 20 14 27 92 3.8 -9 668.60 -55.5 -47.2 -54.5 63 -99 SPO 1997 10 20 14 28 93 3.9 -9 668.60 -55.5 -47.3 -54.5 64 -99 SPO 1997 10 20 14 29 94 3.9 -9 668.60 -55.5 -47.3 -54.6 65 -99 SPO 1997 10 20 14 30 95 3.8 -9 668.60 -55.5 -47.4 -54.6 65 -99 SPO 1997 10 20 14 31 96 3.8 -9 668.60 -55.6 -47.6 -54.8 66 -99 SPO 1997 10 20 14 32 96 3.8 -9 668.60 -55.6 -47.7 -54.8 66 -99 SPO 1997 10 20 14 33 96 3.9 -9 668.60 -55.6 -47.9 -54.8 66 -99 SPO 1997 10 20 14 34 95 4.0 -9 668.50 -55.6 -47.7 -54.8 65 -99 SPO 1997 10 20 14 35 95 4.0 -9 668.50 -55.6 -47.6 -54.8 65 -99 SPO 1997 10 20 14 36 95 3.9 -9 668.50 -55.5 -47.6 -54.8 65 -99 SPO 1997 10 20 14 37 96 3.8 -9 668.50 -55.5 -47.5 -54.8 65 -99 SPO 1997 10 20 14 38 96 3.8 -9 668.50 -55.5 -47.6 -54.8 65 -99 SPO 1997 10 20 14 39 97 3.8 -9 668.50 -55.5 -47.9 -54.8 65 -99 SPO 1997 10 20 14 40 98 3.6 -9 668.50 -55.4 -48.6 -54.8 64 -99 SPO 1997 10 20 14 41 99 3.5 -9 668.50 -55.4 -49.2 -54.7 65 -99 SPO 1997 10 20 14 42 101 3.4 -9 668.50 -55.3 -49.6 -54.7 64 -99 SPO 1997 10 20 14 43 105 3.4 -9 668.50 -55.1 -49.8 -54.6 63 -99 SPO 1997 10 20 14 44 106 3.4 -9 668.50 -54.8 -50.2 -54.3 62 -99 SPO 1997 10 20 14 45 103 3.4 -9 668.50 -54.7 -50.2 -54.3 62 -99 SPO 1997 10 20 14 46 99 3.4 -9 668.50 -55.0 -50.2 -54.4 66 -99 SPO 1997 10 20 14 47 98 3.5 -9 668.50 -55.4 -50.2 -54.6 69 -99 SPO 1997 10 20 14 48 101 3.4 -9 668.50 -55.5 -50.2 -54.8 69 -99 SPO 1997 10 20 14 49 104 3.1 -9 668.50 -55.4 -50.2 -54.8 67 -99 SPO 1997 10 20 14 50 104 3.2 -9 668.50 -55.1 -50.4 -54.5 64 -99 SPO 1997 10 20 14 51 102 3.3 -9 668.40 -55.4 -50.2 -54.7 67 -99 SPO 1997 10 20 14 52 102 3.3 -9 668.40 -55.6 -50.1 -54.8 67 -99 SPO 1997 10 20 14 53 101 3.3 -9 668.40 -55.7 -49.8 -54.8 67 -99 SPO 1997 10 20 14 54 100 3.4 -9 668.40 -55.6 -49.3 -54.8 65 -99 SPO 1997 10 20 14 55 99 3.4 -9 668.40 -55.5 -48.7 -54.7 65 -99 SPO 1997 10 20 14 56 100 3.3 -9 668.40 -55.6 -48.4 -54.6 65 -99 SPO 1997 10 20 14 57 100 3.3 -9 668.40 -55.6 -48.6 -54.7 65 -99 SPO 1997 10 20 14 58 100 3.3 -9 668.30 -55.6 -48.7 -54.7 65 -99 SPO 1997 10 20 14 59 102 3.4 -9 668.30 -55.6 -48.6 -54.7 65 -99 SPO 1997 10 20 15 00 102 3.3 -9 668.30 -55.7 -48.7 -54.9 66 0 SPO 1997 10 20 15 01 103 3.3 -9 668.30 -55.8 -48.8 -54.9 66 -99 SPO 1997 10 20 15 02 105 3.3 -9 668.30 -55.8 -49.0 -55.0 65 -99 SPO 1997 10 20 15 03 104 3.3 -9 668.30 -55.9 -48.8 -55.0 65 -99 SPO 1997 10 20 15 04 104 3.3 -9 668.30 -55.8 -48.5 -55.0 64 -99 SPO 1997 10 20 15 05 104 3.3 -9 668.30 -55.8 -48.5 -55.0 64 -99 SPO 1997 10 20 15 06 103 3.4 -9 668.30 -55.8 -48.7 -55.0 64 -99 SPO 1997 10 20 15 07 102 3.4 -9 668.30 -55.8 -48.4 -55.0 65 -99 SPO 1997 10 20 15 08 101 3.5 -9 668.30 -55.8 -48.0 -54.9 65 -99 SPO 1997 10 20 15 09 100 3.5 -9 668.30 -55.8 -47.6 -54.9 65 -99 SPO 1997 10 20 15 10 100 3.6 -9 668.30 -55.7 -47.2 -54.8 65 -99 SPO 1997 10 20 15 11 99 3.6 -9 668.30 -55.7 -46.8 -54.7 65 -99 SPO 1997 10 20 15 12 102 3.6 -9 668.30 -55.7 -46.5 -54.8 66 -99 SPO 1997 10 20 15 13 104 3.5 -9 668.30 -55.7 -46.6 -54.9 66 -99 SPO 1997 10 20 15 14 103 3.6 -9 668.30 -55.6 -46.7 -54.9 65 -99 SPO 1997 10 20 15 15 103 3.5 -9 668.20 -55.6 -46.8 -54.9 65 -99 SPO 1997 10 20 15 16 101 3.5 -9 668.20 -55.7 -46.9 -54.9 66 -99 SPO 1997 10 20 15 17 99 3.6 -9 668.20 -55.7 -46.8 -54.9 65 -99 SPO 1997 10 20 15 18 98 3.8 -9 668.20 -55.7 -46.6 -54.8 65 -99 SPO 1997 10 20 15 19 99 3.8 -9 668.20 -55.7 -46.3 -54.8 65 -99 SPO 1997 10 20 15 20 100 3.8 -9 668.20 -55.8 -46.2 -55.0 65 -99 SPO 1997 10 20 15 21 101 3.8 -9 668.20 -55.8 -46.0 -55.1 65 -99 SPO 1997 10 20 15 22 103 3.8 -9 668.20 -55.8 -46.0 -55.1 65 -99 SPO 1997 10 20 15 23 103 3.8 -9 668.20 -55.8 -46.3 -55.1 65 -99 SPO 1997 10 20 15 24 104 3.8 -9 668.20 -55.9 -46.8 -55.2 66 -99 SPO 1997 10 20 15 25 105 3.8 -9 668.20 -56.0 -47.2 -55.2 68 -99 SPO 1997 10 20 15 26 104 3.8 -9 668.20 -56.0 -47.5 -55.3 68 -99 SPO 1997 10 20 15 27 102 3.9 -9 668.20 -56.1 -47.8 -55.4 69 -99 SPO 1997 10 20 15 28 101 3.9 -9 668.20 -56.2 -47.7 -55.4 69 -99 SPO 1997 10 20 15 29 104 3.8 -9 668.20 -56.2 -47.6 -55.4 68 -99 SPO 1997 10 20 15 30 104 3.9 -9 668.20 -56.2 -47.7 -55.5 67 -99 SPO 1997 10 20 15 31 102 3.9 -9 668.10 -56.2 -47.6 -55.5 65 -99 SPO 1997 10 20 15 32 99 3.9 -9 668.10 -56.2 -47.4 -55.4 65 -99 SPO 1997 10 20 15 33 99 3.9 -9 668.10 -56.2 -46.9 -55.3 65 -99 SPO 1997 10 20 15 34 98 4.0 -9 668.10 -56.2 -46.5 -55.2 65 -99 SPO 1997 10 20 15 35 97 4.0 -9 668.10 -56.1 -46.0 -55.0 64 -99 SPO 1997 10 20 15 36 96 3.9 -9 668.00 -56.0 -45.8 -54.9 64 -99 SPO 1997 10 20 15 37 96 3.9 -9 668.00 -55.9 -45.9 -54.8 64 -99 SPO 1997 10 20 15 38 97 3.8 -9 668.00 -55.8 -46.1 -54.7 64 -99 SPO 1997 10 20 15 39 98 3.8 -9 668.00 -55.7 -46.2 -54.7 63 -99 SPO 1997 10 20 15 40 99 3.7 -9 668.00 -55.6 -46.1 -54.6 63 -99 SPO 1997 10 20 15 41 99 3.7 -9 668.00 -55.6 -46.2 -54.6 63 -99 SPO 1997 10 20 15 42 99 3.6 -9 668.00 -55.6 -46.4 -54.6 64 -99 SPO 1997 10 20 15 43 101 3.5 -9 668.00 -55.6 -46.4 -54.6 64 -99 SPO 1997 10 20 15 44 104 3.5 -9 668.00 -55.6 -46.8 -54.7 65 -99 SPO 1997 10 20 15 45 107 3.5 -9 668.00 -55.7 -47.6 -54.9 65 -99 SPO 1997 10 20 15 46 108 3.5 -9 668.00 -55.7 -48.7 -55.0 65 -99 SPO 1997 10 20 15 47 108 3.5 -9 668.00 -55.7 -49.0 -55.0 66 -99 SPO 1997 10 20 15 48 107 3.6 -9 668.00 -55.7 -48.8 -54.9 66 -99 SPO 1997 10 20 15 49 107 3.6 -9 668.00 -55.7 -48.6 -54.9 66 -99 SPO 1997 10 20 15 50 107 3.6 -9 667.90 -55.7 -48.8 -55.0 66 -99 SPO 1997 10 20 15 51 106 3.7 -9 667.90 -55.7 -48.9 -54.9 66 -99 SPO 1997 10 20 15 52 106 3.6 -9 667.90 -55.7 -48.6 -54.9 66 -99 SPO 1997 10 20 15 53 106 3.5 -9 667.90 -55.7 -48.2 -54.9 66 -99 SPO 1997 10 20 15 54 106 3.5 -9 667.90 -55.8 -47.8 -54.9 66 -99 SPO 1997 10 20 15 55 105 3.5 -9 667.90 -55.8 -47.6 -55.0 66 -99 SPO 1997 10 20 15 56 104 3.5 -9 667.90 -55.8 -47.5 -55.0 65 -99 SPO 1997 10 20 15 57 105 3.5 -9 667.90 -55.8 -47.4 -54.9 65 -99 SPO 1997 10 20 15 58 108 3.6 -9 667.90 -55.8 -47.6 -55.0 65 -99 SPO 1997 10 20 15 59 109 3.6 -9 667.90 -55.7 -48.4 -55.0 64 -99 SPO 1997 10 20 16 00 106 3.6 -9 667.90 -55.8 -48.7 -55.0 65 0 SPO 1997 10 20 16 01 105 3.6 -9 667.90 -55.7 -48.7 -55.0 65 -99 SPO 1997 10 20 16 02 104 3.6 -9 667.90 -55.6 -48.8 -54.9 65 -99 SPO 1997 10 20 16 03 105 3.5 -9 667.90 -55.7 -48.8 -54.9 66 -99 SPO 1997 10 20 16 04 104 3.6 -9 667.90 -55.7 -48.5 -54.9 67 -99 SPO 1997 10 20 16 05 106 3.6 -9 667.90 -55.7 -48.5 -54.9 67 -99 SPO 1997 10 20 16 06 106 3.6 -9 667.90 -55.6 -49.0 -54.9 66 -99 SPO 1997 10 20 16 07 107 3.6 -9 667.90 -55.7 -49.3 -54.9 67 -99 SPO 1997 10 20 16 08 106 3.6 -9 667.90 -55.6 -49.3 -54.9 65 -99 SPO 1997 10 20 16 09 106 3.7 -9 667.90 -55.5 -49.5 -54.8 65 -99 SPO 1997 10 20 16 10 103 3.8 -9 667.90 -55.4 -49.3 -54.7 65 -99 SPO 1997 10 20 16 11 101 3.8 -9 667.90 -55.3 -48.5 -54.6 64 -99 SPO 1997 10 20 16 12 100 3.8 -9 667.80 -55.3 -47.6 -54.5 65 -99 SPO 1997 10 20 16 13 100 3.8 -9 667.80 -55.3 -47.3 -54.5 65 -99 SPO 1997 10 20 16 14 101 3.8 -9 667.80 -55.3 -47.2 -54.5 65 -99 SPO 1997 10 20 16 15 102 3.8 -9 667.80 -55.2 -47.2 -54.4 66 -99 SPO 1997 10 20 16 16 103 3.8 -9 667.80 -55.2 -47.2 -54.4 66 -99 SPO 1997 10 20 16 17 103 3.9 -9 667.80 -55.2 -47.2 -54.4 66 -99 SPO 1997 10 20 16 18 106 4.0 -9 667.80 -55.2 -47.6 -54.5 66 -99 SPO 1997 10 20 16 19 108 4.1 -9 667.80 -55.2 -48.6 -54.6 66 -99 SPO 1997 10 20 16 20 111 4.2 -9 667.90 -55.2 -49.5 -54.6 66 -99 SPO 1997 10 20 16 21 114 4.3 -9 667.90 -55.2 -50.2 -54.6 66 -99 SPO 1997 10 20 16 22 120 4.4 -9 667.90 -55.2 -50.6 -54.6 66 -99 SPO 1997 10 20 16 23 124 4.5 -9 667.90 -54.9 -51.0 -54.4 64 -99 SPO 1997 10 20 16 24 122 4.5 -9 667.90 -54.8 -51.2 -54.3 64 -99 SPO 1997 10 20 16 25 126 4.5 -9 667.90 -54.8 -51.4 -54.4 66 -99 SPO 1997 10 20 16 26 127 4.6 -9 667.90 -54.7 -51.5 -54.3 66 -99 SPO 1997 10 20 16 27 126 4.7 -9 667.90 -54.7 -51.6 -54.4 68 -99 SPO 1997 10 20 16 28 129 4.7 -9 667.90 -54.8 -51.6 -54.4 70 -99 SPO 1997 10 20 16 29 128 4.7 -9 667.90 -54.8 -51.7 -54.4 70 -99 SPO 1997 10 20 16 30 126 4.7 -9 667.90 -54.9 -51.7 -54.6 71 -99 SPO 1997 10 20 16 31 122 4.6 -9 667.80 -55.0 -51.6 -54.7 71 -99 SPO 1997 10 20 16 32 125 4.7 -9 667.80 -55.2 -51.5 -54.8 71 -99 SPO 1997 10 20 16 33 129 4.8 -9 667.80 -55.2 -51.6 -54.8 69 -99 SPO 1997 10 20 16 34 127 4.8 -9 667.80 -55.2 -51.6 -54.8 68 -99 SPO 1997 10 20 16 35 124 4.8 -9 667.80 -55.3 -51.5 -54.9 67 -99 SPO 1997 10 20 16 36 127 4.9 -9 667.80 -55.3 -51.5 -54.9 66 -99 SPO 1997 10 20 16 37 126 5.0 -9 667.80 -55.3 -51.7 -54.9 66 -99 SPO 1997 10 20 16 38 125 5.0 -9 667.80 -55.3 -51.8 -55.0 67 -99 SPO 1997 10 20 16 39 121 5.0 -9 667.70 -55.4 -51.8 -55.0 68 -99 SPO 1997 10 20 16 40 117 5.0 -9 667.70 -55.5 -51.6 -55.1 68 -99 SPO 1997 10 20 16 41 115 5.0 -9 667.70 -55.5 -51.5 -55.1 68 -99 SPO 1997 10 20 16 42 113 5.0 -9 667.60 -55.5 -51.4 -55.1 68 -99 SPO 1997 10 20 16 43 111 4.9 -9 667.60 -55.5 -51.3 -55.1 68 -99 SPO 1997 10 20 16 44 111 5.0 -9 667.60 -55.5 -51.2 -55.1 67 -99 SPO 1997 10 20 16 45 109 5.0 -9 667.60 -55.5 -51.0 -55.1 66 -99 SPO 1997 10 20 16 46 107 5.0 -9 667.60 -55.4 -50.7 -55.1 65 -99 SPO 1997 10 20 16 47 107 4.9 -9 667.60 -55.5 -50.6 -55.2 65 -99 SPO 1997 10 20 16 48 109 4.9 -9 667.60 -55.6 -50.8 -55.2 66 -99 SPO 1997 10 20 16 49 109 4.8 -9 667.60 -55.6 -51.0 -55.3 66 -99 SPO 1997 10 20 16 50 107 4.8 -9 667.60 -55.6 -51.0 -55.3 66 -99 SPO 1997 10 20 16 51 108 4.8 -9 667.60 -55.7 -50.8 -55.3 67 -99 SPO 1997 10 20 16 52 108 4.7 -9 667.60 -55.7 -51.0 -55.4 67 -99 SPO 1997 10 20 16 53 107 4.8 -9 667.60 -55.7 -50.8 -55.4 66 -99 SPO 1997 10 20 16 54 105 4.7 -9 667.60 -55.6 -50.4 -55.4 65 -99 SPO 1997 10 20 16 55 103 4.7 -9 667.50 -55.6 -49.8 -55.3 65 -99 SPO 1997 10 20 16 56 101 4.6 -9 667.50 -55.6 -49.1 -55.3 65 -99 SPO 1997 10 20 16 57 99 4.7 -9 667.50 -55.7 -48.6 -55.2 65 -99 SPO 1997 10 20 16 58 98 4.7 -9 667.50 -55.7 -48.3 -55.2 65 -99 SPO 1997 10 20 16 59 96 4.6 -9 667.50 -55.6 -48.2 -55.2 64 -99 SPO 1997 10 20 17 00 95 4.6 -9 667.50 -55.6 -48.1 -55.1 64 0 SPO 1997 10 20 17 01 94 4.7 -9 667.50 -55.6 -47.9 -55.1 64 -99 SPO 1997 10 20 17 02 95 4.7 -9 667.50 -55.6 -47.8 -55.0 65 -99 SPO 1997 10 20 17 03 95 4.7 -9 667.50 -55.4 -47.7 -55.0 64 -99 SPO 1997 10 20 17 04 97 4.7 -9 667.50 -55.4 -47.8 -55.0 64 -99 SPO 1997 10 20 17 05 98 4.6 -9 667.50 -55.4 -48.0 -55.0 65 -99 SPO 1997 10 20 17 06 100 4.7 -9 667.50 -55.5 -48.1 -55.1 65 -99 SPO 1997 10 20 17 07 102 4.7 -9 667.50 -55.4 -48.3 -55.1 65 -99 SPO 1997 10 20 17 08 105 4.7 -9 667.50 -55.5 -48.5 -55.2 66 -99 SPO 1997 10 20 17 09 108 4.6 -9 667.50 -55.6 -48.8 -55.3 66 -99 SPO 1997 10 20 17 10 109 4.7 -9 667.50 -55.6 -49.0 -55.4 65 -99 SPO 1997 10 20 17 11 111 4.6 -9 667.50 -55.6 -49.3 -55.3 65 -99 SPO 1997 10 20 17 12 110 4.5 -9 667.50 -55.6 -49.3 -55.4 65 -99 SPO 1997 10 20 17 13 111 4.5 -9 667.50 -55.5 -49.3 -55.2 64 -99 SPO 1997 10 20 17 14 111 4.5 -9 667.50 -55.5 -49.4 -55.3 65 -99 SPO 1997 10 20 17 15 110 4.5 -9 667.50 -55.5 -49.3 -55.2 65 -99 SPO 1997 10 20 17 16 110 4.5 -9 667.50 -55.5 -49.3 -55.2 65 -99 SPO 1997 10 20 17 17 109 4.5 -9 667.50 -55.5 -49.2 -55.2 65 -99 SPO 1997 10 20 17 18 110 4.5 -9 667.40 -55.4 -49.2 -55.2 65 -99 SPO 1997 10 20 17 19 110 4.5 -9 667.40 -55.4 -49.1 -55.2 65 -99 SPO 1997 10 20 17 20 109 4.5 -9 667.40 -55.4 -48.9 -55.2 65 -99 SPO 1997 10 20 17 21 109 4.5 -9 667.40 -55.4 -48.6 -55.2 65 -99 SPO 1997 10 20 17 22 109 4.5 -9 667.40 -55.5 -48.7 -55.2 66 -99 SPO 1997 10 20 17 23 109 4.5 -9 667.40 -55.5 -48.6 -55.3 65 -99 SPO 1997 10 20 17 24 109 4.5 -9 667.40 -55.6 -48.6 -55.3 66 -99 SPO 1997 10 20 17 25 109 4.4 -9 667.40 -55.7 -48.5 -55.4 66 -99 SPO 1997 10 20 17 26 108 4.4 -9 667.40 -55.7 -48.5 -55.5 66 -99 SPO 1997 10 20 17 27 106 4.5 -9 667.40 -55.7 -48.5 -55.4 66 -99 SPO 1997 10 20 17 28 104 4.5 -9 667.30 -55.7 -48.2 -55.4 66 -99 SPO 1997 10 20 17 29 102 4.5 -9 667.30 -55.6 -47.8 -55.3 65 -99 SPO 1997 10 20 17 30 101 4.5 -9 667.30 -55.7 -47.6 -55.4 66 -99 SPO 1997 10 20 17 31 101 4.5 -9 667.30 -55.7 -47.5 -55.4 67 -99 SPO 1997 10 20 17 32 100 4.5 -9 667.30 -55.7 -47.5 -55.4 67 -99 SPO 1997 10 20 17 33 99 4.5 -9 667.30 -55.7 -47.4 -55.3 66 -99 SPO 1997 10 20 17 34 98 4.5 -9 667.30 -55.6 -47.4 -55.2 65 -99 SPO 1997 10 20 17 35 96 4.5 -9 667.30 -55.6 -47.4 -55.2 65 -99 SPO 1997 10 20 17 36 95 4.3 -9 667.30 -55.6 -47.4 -55.1 65 -99 SPO 1997 10 20 17 37 95 4.2 -9 667.30 -55.5 -47.6 -55.1 65 -99 SPO 1997 10 20 17 38 96 4.0 -9 667.30 -55.5 -47.6 -55.1 65 -99 SPO 1997 10 20 17 39 97 3.9 -9 667.30 -55.5 -47.7 -55.1 65 -99 SPO 1997 10 20 17 40 96 3.9 -9 667.30 -55.5 -47.7 -55.1 66 -99 SPO 1997 10 20 17 41 96 3.9 -9 667.30 -55.5 -48.0 -55.1 66 -99 SPO 1997 10 20 17 42 94 3.9 -9 667.30 -55.4 -47.9 -55.0 65 -99 SPO 1997 10 20 17 43 93 3.8 -9 667.30 -55.4 -47.7 -54.9 65 -99 SPO 1997 10 20 17 44 92 3.7 -9 667.20 -55.3 -47.6 -54.9 65 -99 SPO 1997 10 20 17 45 91 3.7 -9 667.20 -55.4 -47.6 -54.9 66 -99 SPO 1997 10 20 17 46 89 3.7 -9 667.20 -55.4 -47.5 -54.8 65 -99 SPO 1997 10 20 17 47 88 3.7 -9 667.20 -55.4 -47.4 -54.8 65 -99 SPO 1997 10 20 17 48 87 3.8 -9 667.20 -55.3 -47.2 -54.7 65 -99 SPO 1997 10 20 17 49 87 3.9 -9 667.20 -55.2 -47.2 -54.6 64 -99 SPO 1997 10 20 17 50 87 3.8 -9 667.20 -55.2 -47.2 -54.6 65 -99 SPO 1997 10 20 17 51 88 3.8 -9 667.20 -55.1 -47.3 -54.6 65 -99 SPO 1997 10 20 17 52 90 3.7 -9 667.20 -55.0 -47.2 -54.6 64 -99 SPO 1997 10 20 17 53 91 3.7 -9 667.20 -55.0 -47.4 -54.6 65 -99 SPO 1997 10 20 17 54 93 3.7 -9 667.20 -55.0 -47.4 -54.6 66 -99 SPO 1997 10 20 17 55 93 3.7 -9 667.20 -54.9 -47.6 -54.5 65 -99 SPO 1997 10 20 17 56 95 3.6 -9 667.20 -54.9 -47.6 -54.5 66 -99 SPO 1997 10 20 17 57 95 3.7 -9 667.20 -54.9 -47.6 -54.4 66 -99 SPO 1997 10 20 17 58 94 3.7 -9 667.20 -54.8 -47.6 -54.3 64 -99 SPO 1997 10 20 17 59 93 3.6 -9 667.10 -54.6 -47.5 -54.2 63 -99 SPO 1997 10 20 18 00 93 3.5 -9 667.10 -54.8 -47.6 -54.3 65 0 SPO 1997 10 20 18 01 95 3.4 -9 667.10 -54.8 -47.7 -54.3 65 -99 SPO 1997 10 20 18 02 96 3.4 -9 667.10 -54.8 -47.8 -54.2 66 -99 SPO 1997 10 20 18 03 97 3.3 -9 667.10 -54.9 -48.0 -54.3 67 -99 SPO 1997 10 20 18 04 98 3.2 -9 667.10 -54.9 -48.2 -54.4 67 -99 SPO 1997 10 20 18 05 99 3.2 -9 667.10 -55.0 -48.4 -54.4 68 -99 SPO 1997 10 20 18 06 101 3.1 -9 667.10 -55.0 -48.8 -54.5 67 -99 SPO 1997 10 20 18 07 101 3.2 -9 667.10 -55.0 -49.3 -54.5 67 -99 SPO 1997 10 20 18 08 101 3.1 -9 667.10 -55.0 -49.4 -54.4 67 -99 SPO 1997 10 20 18 09 102 3.2 -9 667.10 -54.9 -49.3 -54.4 66 -99 SPO 1997 10 20 18 10 102 3.1 -9 667.10 -55.0 -49.2 -54.4 67 -99 SPO 1997 10 20 18 11 103 3.0 -9 667.10 -55.0 -49.2 -54.5 66 -99 SPO 1997 10 20 18 12 102 3.0 -9 667.10 -55.1 -49.2 -54.5 67 -99 SPO 1997 10 20 18 13 100 3.0 -9 667.10 -55.0 -48.9 -54.5 66 -99 SPO 1997 10 20 18 14 99 3.0 -9 667.00 -55.0 -48.7 -54.4 65 -99 SPO 1997 10 20 18 15 97 3.1 -9 667.00 -55.0 -48.5 -54.4 66 -99 SPO 1997 10 20 18 16 96 3.1 -9 667.00 -55.1 -48.2 -54.4 66 -99 SPO 1997 10 20 18 17 95 3.1 -9 667.00 -55.1 -47.9 -54.3 66 -99 SPO 1997 10 20 18 18 96 3.1 -9 667.00 -55.1 -47.8 -54.3 66 -99 SPO 1997 10 20 18 19 99 3.1 -9 667.00 -55.2 -48.0 -54.5 67 -99 SPO 1997 10 20 18 20 101 3.1 -9 667.00 -55.2 -48.8 -54.6 67 -99 SPO 1997 10 20 18 21 102 3.1 -9 667.00 -55.3 -49.4 -54.6 68 -99 SPO 1997 10 20 18 22 103 3.0 -9 667.00 -55.3 -49.9 -54.6 68 -99 SPO 1997 10 20 18 23 105 3.0 -9 667.00 -55.2 -50.2 -54.6 66 -99 SPO 1997 10 20 18 24 105 3.0 -9 667.00 -55.0 -50.4 -54.4 65 -99 SPO 1997 10 20 18 25 106 3.0 -9 667.00 -54.8 -50.4 -54.3 63 -99 SPO 1997 10 20 18 26 107 3.0 -9 667.00 -54.8 -50.2 -54.3 64 -99 SPO 1997 10 20 18 27 107 3.0 -9 667.00 -54.7 -49.9 -54.2 64 -99 SPO 1997 10 20 18 28 110 2.9 -9 667.00 -54.4 -50.0 -54.0 63 -99 SPO 1997 10 20 18 29 112 2.9 -9 667.00 -54.1 -50.3 -53.7 62 -99 SPO 1997 10 20 18 30 114 2.8 -9 667.00 -53.9 -50.5 -53.6 63 -99 SPO 1997 10 20 18 31 119 2.8 -9 667.00 -54.0 -50.6 -53.6 65 -99 SPO 1997 10 20 18 32 133 2.6 -9 667.00 -54.2 -51.0 -53.8 67 -99 SPO 1997 10 20 18 33 143 2.3 -9 667.00 -54.6 -51.3 -54.0 71 -99 SPO 1997 10 20 18 34 130 2.5 -9 667.00 -54.5 -51.4 -54.0 69 -99 SPO 1997 10 20 18 35 130 2.5 -9 667.00 -54.2 -51.3 -53.8 66 -99 SPO 1997 10 20 18 36 132 2.6 -9 667.00 -54.3 -51.3 -53.8 67 -99 SPO 1997 10 20 18 37 133 2.6 -9 667.00 -54.2 -51.4 -53.7 66 -99 SPO 1997 10 20 18 38 133 2.6 -9 666.90 -54.1 -51.4 -53.6 65 -99 SPO 1997 10 20 18 39 127 2.5 -9 667.00 -54.0 -51.3 -53.6 65 -99 SPO 1997 10 20 18 40 121 2.5 -9 666.90 -54.0 -51.1 -53.6 66 -99 SPO 1997 10 20 18 41 124 2.5 -9 666.90 -54.1 -51.0 -53.8 67 -99 SPO 1997 10 20 18 42 126 2.5 -9 666.90 -54.0 -51.1 -53.7 67 -99 SPO 1997 10 20 18 43 124 2.6 -9 666.90 -54.0 -51.1 -53.6 68 -99 SPO 1997 10 20 18 44 118 2.7 -9 666.90 -54.4 -51.0 -53.9 72 -99 SPO 1997 10 20 18 45 120 2.9 -9 666.90 -54.7 -51.0 -54.2 72 -99 SPO 1997 10 20 18 46 123 2.9 -9 666.90 -54.6 -51.0 -54.2 71 -99 SPO 1997 10 20 18 47 119 2.8 -9 666.90 -54.4 -51.1 -54.0 68 -99 SPO 1997 10 20 18 48 111 2.8 -9 666.90 -54.8 -51.0 -54.2 71 -99 SPO 1997 10 20 18 49 115 2.8 -9 666.80 -55.0 -51.0 -54.4 71 -99 SPO 1997 10 20 18 50 119 2.9 -9 666.80 -54.8 -51.2 -54.3 66 -99 SPO 1997 10 20 18 51 120 2.9 -9 666.90 -54.4 -51.3 -54.1 64 -99 SPO 1997 10 20 18 52 125 3.0 -9 666.80 -54.1 -51.3 -53.8 64 -99 SPO 1997 10 20 18 53 125 3.0 -9 666.90 -53.8 -51.3 -53.5 64 -99 SPO 1997 10 20 18 54 125 2.9 -9 666.80 -53.8 -51.3 -53.4 64 -99 SPO 1997 10 20 18 55 124 2.9 -9 666.80 -53.8 -51.2 -53.4 65 -99 SPO 1997 10 20 18 56 121 2.9 -9 666.80 -54.0 -51.1 -53.6 68 -99 SPO 1997 10 20 18 57 118 2.9 -9 666.80 -54.2 -51.1 -53.8 70 -99 SPO 1997 10 20 18 58 116 2.8 -9 666.80 -54.3 -51.0 -53.9 71 -99 SPO 1997 10 20 18 59 117 2.7 -9 666.80 -54.4 -50.8 -54.0 71 -99 SPO 1997 10 20 19 00 116 2.7 -9 666.80 -54.3 -50.9 -53.9 70 0 SPO 1997 10 20 19 01 115 2.7 -9 666.80 -54.4 -50.9 -54.0 70 -99 SPO 1997 10 20 19 02 113 2.9 -9 666.80 -54.6 -50.8 -54.2 71 -99 SPO 1997 10 20 19 03 111 3.0 -9 666.80 -54.8 -50.7 -54.2 71 -99 SPO 1997 10 20 19 04 111 3.1 -9 666.80 -54.8 -50.5 -54.2 69 -99 SPO 1997 10 20 19 05 110 3.0 -9 666.70 -54.7 -50.6 -54.2 68 -99 SPO 1997 10 20 19 06 109 2.9 -9 666.70 -54.7 -50.6 -54.1 69 -99 SPO 1997 10 20 19 07 108 2.9 -9 666.70 -54.7 -50.6 -54.1 69 -99 SPO 1997 10 20 19 08 108 2.9 -9 666.70 -54.7 -50.7 -54.1 68 -99 SPO 1997 10 20 19 09 106 2.9 -9 666.70 -54.7 -50.6 -54.1 68 -99 SPO 1997 10 20 19 10 101 2.8 -9 666.70 -54.8 -50.4 -54.2 69 -99 SPO 1997 10 20 19 11 98 2.9 -9 666.60 -55.0 -50.0 -54.3 69 -99 SPO 1997 10 20 19 12 96 2.9 -9 666.60 -55.1 -49.2 -54.3 69 -99 SPO 1997 10 20 19 13 96 2.9 -9 666.60 -55.1 -48.6 -54.3 68 -99 SPO 1997 10 20 19 14 96 2.9 -9 666.60 -55.1 -48.5 -54.3 66 -99 SPO 1997 10 20 19 15 96 3.0 -9 666.60 -55.1 -48.6 -54.3 66 -99 SPO 1997 10 20 19 16 95 3.1 -9 666.60 -55.1 -48.5 -54.3 66 -99 SPO 1997 10 20 19 17 94 3.1 -9 666.60 -55.0 -48.4 -54.3 65 -99 SPO 1997 10 20 19 18 94 3.1 -9 666.60 -55.1 -48.4 -54.2 66 -99 SPO 1997 10 20 19 19 95 3.1 -9 666.60 -55.1 -48.6 -54.3 66 -99 SPO 1997 10 20 19 20 96 3.1 -9 666.60 -55.1 -48.7 -54.3 66 -99 SPO 1997 10 20 19 21 98 3.0 -9 666.60 -55.1 -48.9 -54.3 66 -99 SPO 1997 10 20 19 22 99 2.9 -9 666.60 -55.1 -49.0 -54.3 66 -99 SPO 1997 10 20 19 23 100 2.9 -9 666.60 -55.0 -49.2 -54.3 66 -99 SPO 1997 10 20 19 24 101 2.9 -9 666.60 -55.0 -49.6 -54.2 66 -99 SPO 1997 10 20 19 25 104 2.8 -9 666.60 -54.9 -50.0 -54.2 65 -99 SPO 1997 10 20 19 26 108 2.6 -9 666.60 -54.4 -50.4 -53.9 61 -99 SPO 1997 10 20 19 27 109 2.6 -9 666.60 -53.9 -50.6 -53.4 59 -99 SPO 1997 10 20 19 28 110 2.6 -9 666.60 -54.0 -50.8 -53.4 61 -99 SPO 1997 10 20 19 29 108 2.7 -9 666.60 -53.8 -50.8 -53.3 61 -99 SPO 1997 10 20 19 30 108 2.7 -9 666.60 -53.7 -50.8 -53.2 62 -99 SPO 1997 10 20 19 31 107 2.7 -9 666.50 -53.7 -50.9 -53.3 64 -99 SPO 1997 10 20 19 32 106 2.8 -9 666.50 -53.8 -50.9 -53.3 65 -99 SPO 1997 10 20 19 33 104 3.0 -9 666.50 -53.9 -50.9 -53.4 67 -99 SPO 1997 10 20 19 34 103 3.0 -9 666.50 -53.9 -50.9 -53.5 67 -99 SPO 1997 10 20 19 35 103 3.1 -9 666.50 -54.0 -50.8 -53.5 68 -99 SPO 1997 10 20 19 36 104 3.1 -9 666.50 -54.0 -50.8 -53.6 68 -99 SPO 1997 10 20 19 37 104 3.1 -9 666.50 -53.8 -50.8 -53.4 67 -99 SPO 1997 10 20 19 38 105 3.2 -9 666.50 -53.7 -50.8 -53.2 67 -99 SPO 1997 10 20 19 39 106 3.1 -9 666.50 -53.6 -50.8 -53.1 66 -99 SPO 1997 10 20 19 40 106 3.1 -9 666.50 -53.5 -50.8 -53.0 66 -99 SPO 1997 10 20 19 41 105 3.1 -9 666.50 -53.6 -50.8 -53.2 68 -99 SPO 1997 10 20 19 42 102 3.2 -9 666.50 -53.8 -50.5 -53.2 68 -99 SPO 1997 10 20 19 43 98 3.3 -9 666.50 -54.0 -50.3 -53.2 70 -99 SPO 1997 10 20 19 44 97 3.4 -9 666.50 -54.2 -50.0 -53.1 70 -99 SPO 1997 10 20 19 45 96 3.3 -9 666.50 -54.3 -49.8 -53.1 70 -99 SPO 1997 10 20 19 46 96 3.4 -9 666.50 -54.4 -49.7 -53.0 70 -99 SPO 1997 10 20 19 47 94 3.5 -9 666.50 -54.5 -49.8 -53.0 70 -99 SPO 1997 10 20 19 48 94 3.5 -9 666.50 -54.5 -49.7 -52.9 69 -99 SPO 1997 10 20 19 49 95 3.5 -9 666.40 -54.7 -49.7 -53.0 69 -99 SPO 1997 10 20 19 50 97 3.6 -9 666.50 -54.9 -49.8 -53.1 71 -99 SPO 1997 10 20 19 51 98 3.6 -9 666.50 -54.8 -50.1 -53.2 67 -99 SPO 1997 10 20 19 52 101 3.5 -9 666.50 -54.6 -50.2 -53.4 65 -99 SPO 1997 10 20 19 53 105 3.4 -9 666.50 -54.4 -50.4 -53.5 63 -99 SPO 1997 10 20 19 54 107 3.5 -9 666.50 -54.3 -50.6 -53.6 63 -99 SPO 1997 10 20 19 55 107 3.6 -9 666.50 -54.2 -50.7 -53.6 63 -99 SPO 1997 10 20 19 56 106 3.7 -9 666.50 -54.3 -50.6 -53.6 65 -99 SPO 1997 10 20 19 57 103 3.8 -9 666.40 -54.2 -50.2 -53.3 65 -99 SPO 1997 10 20 19 58 102 3.8 -9 666.40 -54.1 -49.8 -53.2 66 -99 SPO 1997 10 20 19 59 102 3.8 -9 666.40 -54.2 -49.6 -53.1 67 -99 SPO 1997 10 20 20 00 101 3.9 -9 666.40 -54.2 -49.4 -53.0 68 0 SPO 1997 10 20 20 01 101 3.9 -9 666.40 -54.2 -49.2 -53.1 68 -99 SPO 1997 10 20 20 02 101 3.9 -9 666.40 -54.4 -49.1 -53.1 70 -99 SPO 1997 10 20 20 03 101 3.9 -9 666.40 -54.5 -49.1 -53.2 71 -99 SPO 1997 10 20 20 04 100 3.9 -9 666.40 -54.6 -49.0 -53.3 71 -99 SPO 1997 10 20 20 05 100 3.9 -9 666.40 -54.6 -48.9 -53.4 70 -99 SPO 1997 10 20 20 06 101 3.8 -9 666.40 -54.7 -49.0 -53.6 70 -99 SPO 1997 10 20 20 07 101 3.8 -9 666.40 -54.8 -49.0 -53.7 70 -99 SPO 1997 10 20 20 08 101 3.9 -9 666.40 -54.8 -49.1 -53.8 69 -99 SPO 1997 10 20 20 09 102 3.9 -9 666.40 -54.9 -49.1 -54.0 68 -99 SPO 1997 10 20 20 10 103 3.8 -9 666.40 -54.8 -49.1 -54.0 67 -99 SPO 1997 10 20 20 11 104 3.9 -9 666.40 -54.8 -49.1 -54.0 67 -99 SPO 1997 10 20 20 12 107 3.9 -9 666.40 -54.8 -49.1 -54.0 67 -99 SPO 1997 10 20 20 13 109 3.9 -9 666.40 -54.9 -49.2 -54.1 68 -99 SPO 1997 10 20 20 14 111 3.8 -9 666.40 -54.9 -49.6 -54.2 68 -99 SPO 1997 10 20 20 15 111 3.7 -9 666.40 -54.9 -49.9 -54.2 68 -99 SPO 1997 10 20 20 16 113 3.6 -9 666.40 -54.9 -50.2 -54.2 68 -99 SPO 1997 10 20 20 17 114 3.5 -9 666.40 -54.8 -50.5 -54.2 69 -99 SPO 1997 10 20 20 18 112 3.5 -9 666.40 -54.8 -50.7 -54.2 67 -99 SPO 1997 10 20 20 19 109 3.5 -9 666.40 -54.9 -50.6 -54.2 68 -99 SPO 1997 10 20 20 20 109 3.5 -9 666.40 -55.0 -50.4 -54.2 68 -99 SPO 1997 10 20 20 21 110 3.5 -9 666.40 -55.0 -50.4 -54.2 67 -99 SPO 1997 10 20 20 22 108 3.5 -9 666.40 -55.0 -50.5 -54.2 67 -99 SPO 1997 10 20 20 23 104 3.5 -9 666.40 -55.1 -50.1 -54.1 67 -99 SPO 1997 10 20 20 24 105 3.5 -9 666.40 -55.1 -49.9 -54.0 67 -99 SPO 1997 10 20 20 25 107 3.5 -9 666.40 -55.1 -50.1 -54.2 67 -99 SPO 1997 10 20 20 26 106 3.5 -9 666.30 -55.1 -50.3 -54.2 67 -99 SPO 1997 10 20 20 27 105 3.4 -9 666.30 -55.0 -50.3 -54.1 66 -99 SPO 1997 10 20 20 28 107 3.4 -9 666.30 -55.0 -50.4 -54.2 66 -99 SPO 1997 10 20 20 29 108 3.4 -9 666.30 -55.0 -50.5 -54.2 66 -99 SPO 1997 10 20 20 30 107 3.5 -9 666.30 -55.0 -50.5 -54.2 66 -99 SPO 1997 10 20 20 31 107 3.4 -9 666.30 -55.1 -50.4 -54.3 66 -99 SPO 1997 10 20 20 32 107 3.4 -9 666.30 -55.2 -50.6 -54.4 67 -99 SPO 1997 10 20 20 33 104 3.4 -9 666.30 -55.2 -50.7 -54.3 66 -99 SPO 1997 10 20 20 34 100 3.5 -9 666.30 -55.2 -50.6 -54.2 66 -99 SPO 1997 10 20 20 35 98 3.5 -9 666.30 -55.2 -50.2 -54.1 66 -99 SPO 1997 10 20 20 36 98 3.5 -9 666.30 -55.3 -50.3 -54.1 67 -99 SPO 1997 10 20 20 37 98 3.5 -9 666.20 -55.4 -50.3 -54.1 68 -99 SPO 1997 10 20 20 38 98 3.4 -9 666.30 -55.4 -50.4 -54.2 67 -99 SPO 1997 10 20 20 39 97 3.5 -9 666.20 -55.4 -50.5 -54.2 67 -99 SPO 1997 10 20 20 40 96 3.7 -9 666.20 -55.3 -50.2 -54.2 66 -99 SPO 1997 10 20 20 41 95 3.9 -9 666.20 -55.2 -49.9 -54.0 66 -99 SPO 1997 10 20 20 42 97 3.8 -9 666.20 -55.2 -49.6 -54.0 66 -99 SPO 1997 10 20 20 43 100 3.6 -9 666.30 -55.3 -49.8 -54.2 67 -99 SPO 1997 10 20 20 44 105 3.7 -9 666.20 -55.4 -50.0 -54.6 67 -99 SPO 1997 10 20 20 45 108 3.8 -9 666.30 -55.3 -50.3 -54.7 65 -99 SPO 1997 10 20 20 46 109 3.9 -9 666.20 -55.2 -50.4 -54.6 65 -99 SPO 1997 10 20 20 47 108 3.9 -9 666.30 -55.2 -50.5 -54.6 64 -99 SPO 1997 10 20 20 48 107 3.7 -9 666.10 -55.3 -50.5 -54.6 65 -99 SPO 1997 10 20 20 49 108 3.6 -9 666.10 -55.3 -50.6 -54.6 65 -99 SPO 1997 10 20 20 50 108 3.6 -9 666.10 -55.3 -50.7 -54.6 65 -99 SPO 1997 10 20 20 51 108 3.6 -9 666.10 -55.2 -50.7 -54.6 65 -99 SPO 1997 10 20 20 52 107 3.6 -9 666.10 -55.2 -50.7 -54.6 66 -99 SPO 1997 10 20 20 53 107 3.6 -9 666.10 -55.3 -50.7 -54.6 66 -99 SPO 1997 10 20 20 54 107 3.7 -9 666.10 -55.3 -50.6 -54.6 66 -99 SPO 1997 10 20 20 55 107 3.7 -9 666.10 -55.3 -50.8 -54.6 67 -99 SPO 1997 10 20 20 56 107 3.6 -9 666.10 -55.3 -50.9 -54.6 67 -99 SPO 1997 10 20 20 57 107 3.6 -9 666.10 -55.3 -51.0 -54.6 66 -99 SPO 1997 10 20 20 58 106 3.6 -9 666.00 -55.2 -50.8 -54.6 66 -99 SPO 1997 10 20 20 59 105 3.7 -9 666.00 -55.2 -50.6 -54.6 66 -99 SPO 1997 10 20 21 00 103 3.8 -9 666.00 -55.3 -50.4 -54.6 65 0 SPO 1997 10 20 21 01 100 3.9 -9 666.00 -55.3 -49.8 -54.5 66 -99 SPO 1997 10 20 21 02 100 3.9 -9 666.00 -55.3 -49.2 -54.4 66 -99 SPO 1997 10 20 21 03 102 3.8 -9 666.00 -55.3 -49.2 -54.4 66 -99 SPO 1997 10 20 21 04 107 3.8 -9 666.00 -55.3 -49.8 -54.6 66 -99 SPO 1997 10 20 21 05 110 3.8 -9 666.00 -55.3 -50.5 -54.8 66 -99 SPO 1997 10 20 21 06 109 3.8 -9 666.00 -55.3 -50.8 -54.8 66 -99 SPO 1997 10 20 21 07 104 3.8 -9 666.10 -55.1 -50.8 -54.6 66 -99 SPO 1997 10 20 21 08 100 3.7 -9 666.10 -55.0 -50.6 -54.4 66 -99 SPO 1997 10 20 21 09 99 3.6 -9 666.10 -55.0 -50.2 -54.3 66 -99 SPO 1997 10 20 21 10 99 3.6 -9 666.10 -55.1 -49.8 -54.3 66 -99 SPO 1997 10 20 21 11 99 3.7 -9 666.10 -55.2 -49.6 -54.4 66 -99 SPO 1997 10 20 21 12 97 3.8 -9 666.10 -55.2 -49.8 -54.4 66 -99 SPO 1997 10 20 21 13 96 3.9 -9 666.00 -55.2 -49.6 -54.4 66 -99 SPO 1997 10 20 21 14 94 4.0 -9 666.00 -55.2 -49.2 -54.3 66 -99 SPO 1997 10 20 21 15 94 4.0 -9 666.00 -55.1 -48.8 -54.3 66 -99 SPO 1997 10 20 21 16 93 4.1 -9 666.00 -55.1 -48.4 -54.2 66 -99 SPO 1997 10 20 21 17 94 4.1 -9 666.00 -55.0 -48.4 -54.2 66 -99 SPO 1997 10 20 21 18 93 4.2 -9 666.00 -55.0 -48.4 -54.2 66 -99 SPO 1997 10 20 21 19 93 4.2 -9 666.00 -54.8 -48.3 -54.1 66 -99 SPO 1997 10 20 21 20 93 4.2 -9 666.00 -54.8 -48.2 -54.0 66 -99 SPO 1997 10 20 21 21 93 4.2 -9 666.00 -54.6 -48.0 -54.0 65 -99 SPO 1997 10 20 21 22 93 4.3 -9 666.00 -54.6 -48.0 -53.9 65 -99 SPO 1997 10 20 21 23 92 4.3 -9 666.00 -54.6 -47.9 -53.9 66 -99 SPO 1997 10 20 21 24 92 4.4 -9 665.90 -54.5 -47.9 -53.9 64 -99 SPO 1997 10 20 21 25 92 4.4 -9 665.90 -54.5 -47.8 -53.8 65 -99 SPO 1997 10 20 21 26 92 4.4 -9 665.90 -54.4 -47.8 -53.8 66 -99 SPO 1997 10 20 21 27 92 4.4 -9 665.90 -54.4 -47.8 -53.7 67 -99 SPO 1997 10 20 21 28 92 4.4 -9 665.90 -54.3 -47.8 -53.7 67 -99 SPO 1997 10 20 21 29 91 4.4 -9 665.90 -54.3 -47.8 -53.7 67 -99 SPO 1997 10 20 21 30 91 4.5 -9 665.90 -54.2 -47.8 -53.6 67 -99 SPO 1997 10 20 21 31 91 4.5 -9 665.90 -54.2 -47.8 -53.6 67 -99 SPO 1997 10 20 21 32 91 4.5 -9 665.90 -54.1 -47.8 -53.6 67 -99 SPO 1997 10 20 21 33 91 4.4 -9 665.90 -54.1 -47.8 -53.5 67 -99 SPO 1997 10 20 21 34 91 4.4 -9 665.90 -54.1 -47.9 -53.5 67 -99 SPO 1997 10 20 21 35 89 4.5 -9 665.90 -54.1 -47.9 -53.5 67 -99 SPO 1997 10 20 21 36 88 4.6 -9 665.90 -54.1 -48.0 -53.5 67 -99 SPO 1997 10 20 21 37 88 4.7 -9 665.90 -54.0 -47.9 -53.4 67 -99 SPO 1997 10 20 21 38 88 4.7 -9 665.80 -53.9 -47.8 -53.4 66 -99 SPO 1997 10 20 21 39 88 4.8 -9 665.80 -54.0 -47.8 -53.4 67 -99 SPO 1997 10 20 21 40 88 4.8 -9 665.90 -53.9 -47.9 -53.4 67 -99 SPO 1997 10 20 21 41 88 4.8 -9 665.90 -53.9 -48.0 -53.3 67 -99 SPO 1997 10 20 21 42 88 4.9 -9 665.80 -53.9 -48.0 -53.3 68 -99 SPO 1997 10 20 21 43 88 5.0 -9 665.80 -53.9 -48.0 -53.3 68 -99 SPO 1997 10 20 21 44 88 5.1 -9 665.80 -53.8 -48.0 -53.3 67 -99 SPO 1997 10 20 21 45 89 5.1 -9 665.80 -53.8 -48.0 -53.2 67 -99 SPO 1997 10 20 21 46 89 5.2 -9 665.80 -53.7 -48.0 -53.2 67 -99 SPO 1997 10 20 21 47 90 5.2 -9 665.90 -53.7 -47.9 -53.2 67 -99 SPO 1997 10 20 21 48 89 5.2 -9 665.90 -53.6 -47.9 -53.2 67 -99 SPO 1997 10 20 21 49 89 5.2 -9 665.90 -53.6 -47.9 -53.1 66 -99 SPO 1997 10 20 21 50 88 5.2 -9 665.80 -53.6 -47.9 -53.1 67 -99 SPO 1997 10 20 21 51 87 5.2 -9 665.80 -53.6 -47.9 -53.1 67 -99 SPO 1997 10 20 21 52 87 5.2 -9 665.80 -53.6 -47.8 -53.1 67 -99 SPO 1997 10 20 21 53 88 5.1 -9 665.80 -53.6 -47.8 -53.1 67 -99 SPO 1997 10 20 21 54 88 5.0 -9 665.80 -53.6 -48.0 -53.1 67 -99 SPO 1997 10 20 21 55 89 5.0 -9 665.80 -53.7 -48.1 -53.1 67 -99 SPO 1997 10 20 21 56 90 4.9 -9 665.90 -53.7 -48.4 -53.2 67 -99 SPO 1997 10 20 21 57 92 4.8 -9 665.90 -53.8 -48.6 -53.2 69 -99 SPO 1997 10 20 21 58 94 4.8 -9 665.90 -53.9 -48.9 -53.2 70 -99 SPO 1997 10 20 21 59 94 4.8 -9 665.90 -53.9 -49.2 -53.3 69 -99 SPO 1997 10 20 22 00 94 4.8 -9 665.90 -54.0 -49.3 -53.3 69 0 SPO 1997 10 20 22 01 94 4.8 -9 665.90 -54.0 -49.3 -53.4 68 -99 SPO 1997 10 20 22 02 93 4.8 -9 665.80 -54.0 -49.3 -53.4 67 -99 SPO 1997 10 20 22 03 93 4.8 -9 665.80 -54.0 -49.3 -53.4 67 -99 SPO 1997 10 20 22 04 93 4.9 -9 665.80 -54.0 -49.2 -53.3 67 -99 SPO 1997 10 20 22 05 93 4.8 -9 665.80 -54.0 -49.1 -53.3 67 -99 SPO 1997 10 20 22 06 93 4.8 -9 665.80 -54.0 -49.2 -53.3 67 -99 SPO 1997 10 20 22 07 95 4.7 -9 665.80 -54.0 -49.4 -53.2 67 -99 SPO 1997 10 20 22 08 96 4.6 -9 665.80 -54.0 -49.5 -53.2 67 -99 SPO 1997 10 20 22 09 97 4.5 -9 665.80 -54.0 -49.5 -53.2 67 -99 SPO 1997 10 20 22 10 97 4.4 -9 665.80 -54.0 -49.6 -53.2 68 -99 SPO 1997 10 20 22 11 97 4.4 -9 665.80 -53.9 -49.6 -53.2 67 -99 SPO 1997 10 20 22 12 96 4.3 -9 665.80 -53.9 -49.6 -53.1 67 -99 SPO 1997 10 20 22 13 95 4.2 -9 665.80 -53.9 -49.6 -53.0 67 -99 SPO 1997 10 20 22 14 95 4.1 -9 665.70 -53.9 -49.6 -53.0 67 -99 SPO 1997 10 20 22 15 95 4.1 -9 665.70 -54.0 -49.6 -53.1 67 -99 SPO 1997 10 20 22 16 96 4.1 -9 665.70 -54.0 -49.5 -53.1 67 -99 SPO 1997 10 20 22 17 98 4.0 -9 665.70 -54.1 -49.6 -53.1 68 -99 SPO 1997 10 20 22 18 100 3.9 -9 665.70 -54.1 -49.6 -53.2 68 -99 SPO 1997 10 20 22 19 102 3.9 -9 665.70 -54.2 -49.6 -53.4 69 -99 SPO 1997 10 20 22 20 104 3.8 -9 665.70 -54.2 -49.6 -53.4 69 -99 SPO 1997 10 20 22 21 104 3.8 -9 665.70 -54.2 -49.6 -53.5 69 -99 SPO 1997 10 20 22 22 105 3.9 -9 665.70 -54.2 -49.7 -53.4 69 -99 SPO 1997 10 20 22 23 106 3.9 -9 665.70 -54.1 -49.7 -53.4 69 -99 SPO 1997 10 20 22 24 106 3.8 -9 665.70 -54.0 -49.8 -53.4 68 -99 SPO 1997 10 20 22 25 105 3.8 -9 665.70 -54.0 -49.8 -53.4 68 -99 SPO 1997 10 20 22 26 103 3.7 -9 665.70 -54.0 -49.6 -53.3 67 -99 SPO 1997 10 20 22 27 105 3.7 -9 665.70 -53.9 -49.5 -53.2 67 -99 SPO 1997 10 20 22 28 107 3.6 -9 665.70 -53.8 -49.6 -53.3 65 -99 SPO 1997 10 20 22 29 109 3.6 -9 665.70 -53.9 -49.7 -53.4 66 -99 SPO 1997 10 20 22 30 108 3.5 -9 665.70 -54.0 -49.8 -53.4 67 -99 SPO 1997 10 20 22 31 108 3.5 -9 665.70 -54.0 -49.9 -53.4 67 -99 SPO 1997 10 20 22 32 108 3.6 -9 665.70 -54.0 -49.9 -53.4 68 -99 SPO 1997 10 20 22 33 110 3.5 -9 665.70 -53.9 -49.9 -53.4 67 -99 SPO 1997 10 20 22 34 112 3.5 -9 665.70 -53.9 -50.0 -53.4 67 -99 SPO 1997 10 20 22 35 113 3.5 -9 665.70 -53.9 -50.1 -53.4 67 -99 SPO 1997 10 20 22 36 114 3.5 -9 665.70 -54.0 -50.0 -53.5 68 -99 SPO 1997 10 20 22 37 117 3.7 -9 665.70 -54.0 -50.0 -53.5 69 -99 SPO 1997 10 20 22 38 116 3.7 -9 665.70 -53.9 -50.2 -53.4 68 -99 SPO 1997 10 20 22 39 114 3.7 -9 665.70 -53.8 -50.2 -53.4 67 -99 SPO 1997 10 20 22 40 114 3.7 -9 665.70 -53.8 -50.2 -53.3 67 -99 SPO 1997 10 20 22 41 114 3.8 -9 665.70 -53.7 -50.3 -53.3 67 -99 SPO 1997 10 20 22 42 113 3.7 -9 665.70 -53.7 -50.3 -53.2 67 -99 SPO 1997 10 20 22 43 113 3.8 -9 665.60 -53.6 -50.3 -53.2 67 -99 SPO 1997 10 20 22 44 116 3.8 -9 665.50 -53.6 -50.4 -53.2 68 -99 SPO 1997 10 20 22 45 118 3.9 -9 665.50 -53.6 -50.6 -53.2 68 -99 SPO 1997 10 20 22 46 117 3.9 -9 665.50 -53.6 -50.6 -53.2 68 -99 SPO 1997 10 20 22 47 116 3.9 -9 665.50 -53.6 -50.8 -53.2 68 -99 SPO 1997 10 20 22 48 116 4.0 -9 665.50 -53.7 -50.8 -53.2 69 -99 SPO 1997 10 20 22 49 116 4.0 -9 665.50 -53.7 -50.8 -53.2 69 -99 SPO 1997 10 20 22 50 117 4.0 -9 665.50 -53.7 -50.8 -53.2 68 -99 SPO 1997 10 20 22 51 120 4.0 -9 665.60 -53.7 -50.8 -53.2 68 -99 SPO 1997 10 20 22 52 122 4.0 -9 665.60 -53.7 -51.0 -53.2 68 -99 SPO 1997 10 20 22 53 122 4.0 -9 665.60 -53.6 -51.0 -53.2 68 -99 SPO 1997 10 20 22 54 121 4.0 -9 665.50 -53.7 -51.0 -53.3 68 -99 SPO 1997 10 20 22 55 121 4.1 -9 665.50 -53.7 -51.0 -53.3 69 -99 SPO 1997 10 20 22 56 121 4.1 -9 665.50 -53.7 -51.1 -53.3 69 -99 SPO 1997 10 20 22 57 122 4.1 -9 665.50 -53.7 -51.2 -53.2 69 -99 SPO 1997 10 20 22 58 122 4.2 -9 665.50 -53.7 -51.2 -53.2 69 -99 SPO 1997 10 20 22 59 120 4.1 -9 665.50 -53.7 -51.2 -53.1 70 -99 SPO 1997 10 20 23 00 118 4.1 -9 665.50 -53.6 -51.2 -53.1 68 0 SPO 1997 10 20 23 01 118 4.0 -9 665.50 -53.6 -51.2 -53.1 68 -99 SPO 1997 10 20 23 02 115 4.1 -9 665.50 -53.6 -51.1 -53.0 68 -99 SPO 1997 10 20 23 03 114 4.1 -9 665.50 -53.5 -51.1 -53.0 68 -99 SPO 1997 10 20 23 04 113 4.2 -9 665.50 -53.5 -51.0 -52.9 68 -99 SPO 1997 10 20 23 05 114 4.3 -9 665.60 -53.5 -51.1 -52.9 68 -99 SPO 1997 10 20 23 06 113 4.3 -9 665.60 -53.5 -51.1 -52.9 68 -99 SPO 1997 10 20 23 07 112 4.3 -9 665.60 -53.5 -51.0 -52.9 68 -99 SPO 1997 10 20 23 08 113 4.3 -9 665.60 -53.4 -51.0 -52.8 67 -99 SPO 1997 10 20 23 09 113 4.1 -9 665.60 -53.4 -50.9 -52.8 67 -99 SPO 1997 10 20 23 10 114 4.0 -9 665.60 -53.4 -50.8 -52.7 68 -99 SPO 1997 10 20 23 11 114 4.0 -9 665.60 -53.4 -50.8 -52.7 68 -99 SPO 1997 10 20 23 12 116 3.8 -9 665.60 -53.4 -50.8 -52.7 68 -99 SPO 1997 10 20 23 13 114 3.8 -9 665.60 -53.4 -50.7 -52.7 68 -99 SPO 1997 10 20 23 14 113 3.8 -9 665.50 -53.5 -50.6 -52.7 69 -99 SPO 1997 10 20 23 15 113 3.7 -9 665.50 -53.6 -50.7 -52.7 70 -99 SPO 1997 10 20 23 16 112 3.7 -9 665.50 -53.6 -50.7 -52.8 70 -99 SPO 1997 10 20 23 17 110 3.7 -9 665.50 -53.7 -50.7 -52.9 70 -99 SPO 1997 10 20 23 18 108 3.7 -9 665.50 -53.7 -50.6 -52.9 69 -99 SPO 1997 10 20 23 19 107 3.8 -9 665.50 -53.7 -50.6 -52.9 69 -99 SPO 1997 10 20 23 20 107 3.8 -9 665.50 -53.8 -50.5 -53.0 69 -99 SPO 1997 10 20 23 21 106 3.8 -9 665.50 -53.9 -50.5 -53.1 69 -99 SPO 1997 10 20 23 22 105 3.8 -9 665.40 -53.9 -50.6 -53.1 69 -99 SPO 1997 10 20 23 23 103 4.0 -9 665.40 -53.8 -50.5 -53.0 68 -99 SPO 1997 10 20 23 24 101 4.0 -9 665.40 -53.8 -50.4 -52.8 68 -99 SPO 1997 10 20 23 25 100 3.9 -9 665.40 -53.9 -50.5 -52.7 69 -99 SPO 1997 10 20 23 26 101 3.9 -9 665.40 -53.8 -50.4 -52.6 67 -99 SPO 1997 10 20 23 27 101 4.0 -9 665.40 -53.8 -50.4 -52.7 68 -99 SPO 1997 10 20 23 28 102 3.9 -9 665.40 -53.8 -50.5 -52.7 68 -99 SPO 1997 10 20 23 29 103 3.8 -9 665.40 -53.8 -50.5 -52.8 68 -99 SPO 1997 10 20 23 30 103 3.9 -9 665.40 -53.8 -50.5 -52.7 68 -99 SPO 1997 10 20 23 31 100 3.9 -9 665.40 -53.7 -50.5 -52.7 67 -99 SPO 1997 10 20 23 32 99 3.9 -9 665.40 -53.7 -50.4 -52.6 67 -99 SPO 1997 10 20 23 33 98 4.0 -9 665.40 -53.6 -50.4 -52.6 67 -99 SPO 1997 10 20 23 34 96 4.0 -9 665.40 -53.5 -50.4 -52.5 67 -99 SPO 1997 10 20 23 35 96 4.1 -9 665.40 -53.5 -50.4 -52.4 68 -99 SPO 1997 10 20 23 36 96 4.2 -9 665.40 -53.5 -50.4 -52.2 68 -99 SPO 1997 10 20 23 37 94 4.2 -9 665.40 -53.5 -50.3 -52.2 68 -99 SPO 1997 10 20 23 38 93 4.2 -9 665.30 -53.5 -50.3 -52.1 69 -99 SPO 1997 10 20 23 39 93 4.3 -9 665.30 -53.5 -50.3 -52.1 69 -99 SPO 1997 10 20 23 40 93 4.4 -9 665.30 -53.5 -50.3 -52.1 70 -99 SPO 1997 10 20 23 41 93 4.4 -9 665.30 -53.4 -50.2 -52.0 69 -99 SPO 1997 10 20 23 42 92 4.6 -9 665.30 -53.4 -50.2 -52.0 69 -99 SPO 1997 10 20 23 43 92 4.7 -9 665.30 -53.4 -50.1 -52.1 70 -99 SPO 1997 10 20 23 44 92 4.7 -9 665.30 -53.4 -50.1 -52.1 70 -99 SPO 1997 10 20 23 45 92 4.8 -9 665.30 -53.4 -50.0 -52.2 70 -99 SPO 1997 10 20 23 46 93 4.8 -9 665.30 -53.4 -50.0 -52.2 70 -99 SPO 1997 10 20 23 47 94 4.8 -9 665.30 -53.3 -50.0 -52.1 68 -99 SPO 1997 10 20 23 48 93 4.8 -9 665.30 -53.3 -50.0 -52.1 68 -99 SPO 1997 10 20 23 49 94 4.8 -9 665.20 -53.2 -50.0 -52.1 68 -99 SPO 1997 10 20 23 50 96 4.7 -9 665.20 -53.3 -50.0 -52.1 68 -99 SPO 1997 10 20 23 51 97 4.7 -9 665.20 -53.3 -50.0 -52.1 69 -99 SPO 1997 10 20 23 52 98 4.5 -9 665.20 -53.3 -50.0 -52.1 69 -99 SPO 1997 10 20 23 53 98 4.5 -9 665.20 -53.4 -50.0 -52.1 70 -99 SPO 1997 10 20 23 54 98 4.4 -9 665.20 -53.4 -50.1 -52.1 70 -99 SPO 1997 10 20 23 55 98 4.4 -9 665.20 -53.4 -50.1 -52.1 70 -99 SPO 1997 10 20 23 56 99 4.3 -9 665.20 -53.4 -50.2 -52.1 69 -99 SPO 1997 10 20 23 57 101 4.3 -9 665.20 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 20 23 58 103 4.2 -9 665.20 -53.6 -50.4 -52.2 -99 -99 SPO 1997 10 20 23 59 104 4.2 -9 665.20 -53.7 -50.4 -52.4 -99 -99 SPO 1997 10 21 00 00 103 4.1 -9 665.30 -53.8 -50.5 -52.6 -99 0 SPO 1997 10 21 00 01 103 4.0 -9 665.30 -53.8 -50.6 -52.6 -99 -99 SPO 1997 10 21 00 02 103 4.0 -9 665.20 -53.9 -50.6 -52.7 -99 -99 SPO 1997 10 21 00 03 102 3.9 -9 665.20 -54.0 -50.5 -52.8 70 -99 SPO 1997 10 21 00 04 101 3.9 -9 665.10 -54.0 -50.5 -52.7 70 -99 SPO 1997 10 21 00 05 99 3.9 -9 665.10 -53.9 -50.4 -52.6 69 -99 SPO 1997 10 21 00 06 98 4.0 -9 665.10 -53.8 -50.3 -52.6 68 -99 SPO 1997 10 21 00 07 98 4.0 -9 665.10 -53.8 -50.2 -52.5 68 -99 SPO 1997 10 21 00 08 99 4.0 -9 665.10 -53.7 -50.2 -52.5 67 -99 SPO 1997 10 21 00 09 99 4.0 -9 665.10 -53.7 -50.2 -52.5 67 -99 SPO 1997 10 21 00 10 99 4.1 -9 665.10 -53.6 -50.3 -52.5 67 -99 SPO 1997 10 21 00 11 99 4.2 -9 665.10 -53.6 -50.3 -52.5 68 -99 SPO 1997 10 21 00 12 98 4.2 -9 665.10 -53.6 -50.3 -52.5 68 -99 SPO 1997 10 21 00 13 98 4.2 -9 665.10 -53.6 -50.3 -52.4 68 -99 SPO 1997 10 21 00 14 98 4.2 -9 665.10 -53.5 -50.3 -52.4 67 -99 SPO 1997 10 21 00 15 98 4.3 -9 665.00 -53.5 -50.2 -52.3 67 -99 SPO 1997 10 21 00 16 98 4.3 -9 665.00 -53.5 -50.2 -52.3 68 -99 SPO 1997 10 21 00 17 99 4.3 -9 665.00 -53.5 -50.2 -52.2 68 -99 SPO 1997 10 21 00 18 99 4.2 -9 665.00 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 21 00 19 99 4.2 -9 665.00 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 21 00 20 99 4.2 -9 665.00 -53.5 -50.3 -52.2 70 -99 SPO 1997 10 21 00 21 98 4.1 -9 665.00 -53.5 -50.3 -52.2 70 -99 SPO 1997 10 21 00 22 98 4.0 -9 665.00 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 21 00 23 97 4.0 -9 665.00 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 21 00 24 97 4.0 -9 665.00 -53.5 -50.2 -52.2 70 -99 SPO 1997 10 21 00 25 97 4.0 -9 665.00 -53.5 -50.2 -52.2 71 -99 SPO 1997 10 21 00 26 98 4.0 -9 665.00 -53.5 -50.1 -52.4 71 -99 SPO 1997 10 21 00 27 98 4.0 -9 665.00 -53.5 -50.2 -52.6 70 -99 SPO 1997 10 21 00 28 97 4.0 -9 665.00 -53.5 -50.3 -52.6 70 -99 SPO 1997 10 21 00 29 97 4.0 -9 665.00 -53.4 -50.3 -52.4 69 -99 SPO 1997 10 21 00 30 97 4.0 -9 665.00 -53.4 -50.3 -52.3 69 -99 SPO 1997 10 21 00 31 98 4.0 -9 665.00 -53.4 -50.3 -52.2 69 -99 SPO 1997 10 21 00 32 98 4.0 -9 665.00 -53.4 -50.3 -52.1 69 -99 SPO 1997 10 21 00 33 98 4.0 -9 664.90 -53.4 -50.4 -52.0 69 -99 SPO 1997 10 21 00 34 97 4.0 -9 664.90 -53.4 -50.5 -52.1 69 -99 SPO 1997 10 21 00 35 97 3.9 -9 664.90 -53.4 -50.5 -52.2 69 -99 SPO 1997 10 21 00 36 97 3.9 -9 664.90 -53.5 -50.6 -52.5 70 -99 SPO 1997 10 21 00 37 97 3.9 -9 664.90 -53.5 -50.6 -52.6 70 -99 SPO 1997 10 21 00 38 97 3.8 -9 664.90 -53.6 -50.7 -52.7 71 -99 SPO 1997 10 21 00 39 97 3.9 -9 664.90 -53.4 -50.6 -52.6 69 -99 SPO 1997 10 21 00 40 96 3.9 -9 664.90 -53.4 -50.6 -52.5 69 -99 SPO 1997 10 21 00 41 95 3.9 -9 664.90 -53.4 -50.7 -52.5 69 -99 SPO 1997 10 21 00 42 95 3.9 -9 664.90 -53.6 -50.7 -52.7 71 -99 SPO 1997 10 21 00 43 95 4.0 -9 664.90 -53.6 -50.8 -52.7 69 -99 SPO 1997 10 21 00 44 95 4.0 -9 664.90 -53.6 -50.8 -52.8 69 -99 SPO 1997 10 21 00 45 95 4.0 -9 664.80 -53.6 -50.8 -52.7 69 -99 SPO 1997 10 21 00 46 95 4.1 -9 664.80 -53.5 -50.9 -52.5 68 -99 SPO 1997 10 21 00 47 95 4.2 -9 664.80 -53.6 -51.0 -52.4 69 -99 SPO 1997 10 21 00 48 96 4.2 -9 664.80 -53.6 -51.0 -52.5 69 -99 SPO 1997 10 21 00 49 95 4.1 -9 664.80 -53.7 -51.0 -52.5 70 -99 SPO 1997 10 21 00 50 95 4.2 -9 664.80 -53.7 -51.0 -52.4 70 -99 SPO 1997 10 21 00 51 93 4.2 -9 664.80 -53.8 -51.0 -52.4 71 -99 SPO 1997 10 21 00 52 92 4.3 -9 664.80 -53.9 -51.0 -52.4 72 -99 SPO 1997 10 21 00 53 92 4.3 -9 664.80 -53.9 -51.0 -52.4 70 -99 SPO 1997 10 21 00 54 92 4.4 -9 664.80 -54.0 -50.9 -52.4 70 -99 SPO 1997 10 21 00 55 92 4.4 -9 664.80 -54.1 -50.8 -52.4 71 -99 SPO 1997 10 21 00 56 91 4.4 -9 664.80 -54.1 -50.8 -52.4 69 -99 SPO 1997 10 21 00 57 90 4.5 -9 664.80 -54.1 -50.7 -52.5 69 -99 SPO 1997 10 21 00 58 88 4.6 -9 664.80 -54.2 -50.6 -52.6 70 -99 SPO 1997 10 21 00 59 88 4.6 -9 664.70 -54.2 -50.5 -52.6 70 -99 SPO 1997 10 21 01 00 88 4.6 -9 664.70 -54.1 -50.4 -52.6 69 0 SPO 1997 10 21 01 01 88 4.5 -9 664.70 -54.0 -50.3 -52.5 68 -99 SPO 1997 10 21 01 02 89 4.5 -9 664.70 -54.0 -50.3 -52.5 68 -99 SPO 1997 10 21 01 03 91 4.5 -9 664.70 -54.0 -50.4 -52.5 68 -99 SPO 1997 10 21 01 04 92 4.6 -9 664.70 -54.0 -50.4 -52.5 70 -99 SPO 1997 10 21 01 05 93 4.7 -9 664.70 -54.0 -50.6 -52.5 70 -99 SPO 1997 10 21 01 06 93 4.7 -9 664.70 -54.0 -50.6 -52.6 68 -99 SPO 1997 10 21 01 07 92 4.8 -9 664.60 -54.0 -50.6 -52.6 68 -99 SPO 1997 10 21 01 08 91 4.9 -9 664.60 -54.1 -50.4 -52.6 69 -99 SPO 1997 10 21 01 09 90 5.0 -9 664.60 -54.1 -50.3 -52.7 69 -99 SPO 1997 10 21 01 10 89 5.0 -9 664.60 -54.1 -50.3 -52.7 69 -99 SPO 1997 10 21 01 11 90 5.0 -9 664.60 -54.3 -50.3 -52.8 71 -99 SPO 1997 10 21 01 12 90 5.0 -9 664.60 -54.3 -50.3 -52.8 69 -99 SPO 1997 10 21 01 13 92 4.8 -9 664.60 -54.4 -50.4 -52.8 72 -99 SPO 1997 10 21 01 14 94 4.8 -9 664.60 -54.5 -50.6 -52.9 71 -99 SPO 1997 10 21 01 15 96 4.7 -9 664.60 -54.6 -50.8 -53.0 71 -99 SPO 1997 10 21 01 16 98 4.6 -9 664.60 -54.7 -50.9 -53.3 71 -99 SPO 1997 10 21 01 17 101 4.6 -9 664.60 -54.8 -51.0 -53.6 72 -99 SPO 1997 10 21 01 18 103 4.6 -9 664.60 -54.9 -51.0 -53.8 71 -99 SPO 1997 10 21 01 19 103 4.6 -9 664.60 -55.0 -51.0 -54.0 71 -99 SPO 1997 10 21 01 20 101 4.7 -9 664.60 -55.0 -51.1 -54.0 71 -99 SPO 1997 10 21 01 21 98 4.7 -9 664.60 -55.0 -51.0 -53.8 70 -99 SPO 1997 10 21 01 22 97 4.8 -9 664.60 -55.0 -50.8 -53.5 70 -99 SPO 1997 10 21 01 23 98 4.7 -9 664.60 -54.8 -50.7 -53.4 66 -99 SPO 1997 10 21 01 24 99 4.7 -9 664.60 -54.7 -50.7 -53.3 66 -99 SPO 1997 10 21 01 25 100 4.7 -9 664.60 -54.8 -50.7 -53.4 66 -99 SPO 1997 10 21 01 26 100 4.7 -9 664.60 -54.8 -50.6 -53.5 66 -99 SPO 1997 10 21 01 27 100 4.7 -9 664.60 -54.7 -50.5 -53.4 66 -99 SPO 1997 10 21 01 28 100 4.7 -9 664.60 -54.8 -50.4 -53.4 68 -99 SPO 1997 10 21 01 29 100 4.7 -9 664.60 -54.8 -50.4 -53.4 68 -99 SPO 1997 10 21 01 30 100 4.8 -9 664.50 -54.7 -50.3 -53.4 68 -99 SPO 1997 10 21 01 31 99 4.9 -9 664.50 -54.7 -50.4 -53.4 68 -99 SPO 1997 10 21 01 32 98 5.1 -9 664.50 -54.6 -50.2 -53.3 69 -99 SPO 1997 10 21 01 33 96 5.1 -9 664.50 -54.5 -50.0 -53.1 68 -99 SPO 1997 10 21 01 34 95 5.2 -9 664.50 -54.4 -49.8 -53.0 69 -99 SPO 1997 10 21 01 35 95 5.2 -9 664.50 -54.4 -49.7 -53.0 69 -99 SPO 1997 10 21 01 36 94 5.1 -9 664.50 -54.3 -49.9 -53.0 68 -99 SPO 1997 10 21 01 37 92 5.2 -9 664.50 -54.3 -50.2 -52.9 68 -99 SPO 1997 10 21 01 38 91 5.2 -9 664.40 -54.3 -50.3 -52.9 68 -99 SPO 1997 10 21 01 39 90 5.3 -9 664.40 -54.2 -50.3 -52.9 67 -99 SPO 1997 10 21 01 40 88 5.4 -9 664.40 -54.2 -50.2 -52.9 68 -99 SPO 1997 10 21 01 41 89 5.4 -9 664.40 -54.2 -50.2 -52.9 68 -99 SPO 1997 10 21 01 42 89 5.3 -9 664.40 -54.2 -50.3 -52.9 70 -99 SPO 1997 10 21 01 43 88 5.4 -9 664.40 -54.1 -50.4 -52.9 69 -99 SPO 1997 10 21 01 44 87 5.5 -9 664.40 -54.1 -50.4 -52.8 69 -99 SPO 1997 10 21 01 45 88 5.4 -9 664.40 -54.0 -50.5 -52.8 68 -99 SPO 1997 10 21 01 46 90 5.3 -9 664.40 -54.0 -50.6 -52.8 68 -99 SPO 1997 10 21 01 47 91 5.2 -9 664.40 -54.0 -50.8 -52.8 70 -99 SPO 1997 10 21 01 48 92 5.1 -9 664.40 -54.1 -50.9 -52.8 71 -99 SPO 1997 10 21 01 49 90 5.1 -9 664.40 -54.2 -50.9 -52.8 72 -99 SPO 1997 10 21 01 50 90 5.1 -9 664.40 -54.2 -50.8 -52.8 70 -99 SPO 1997 10 21 01 51 90 5.1 -9 664.40 -54.3 -50.8 -52.9 71 -99 SPO 1997 10 21 01 52 90 5.1 -9 664.40 -54.4 -50.8 -52.9 72 -99 SPO 1997 10 21 01 53 92 5.0 -9 664.40 -54.4 -50.9 -53.0 70 -99 SPO 1997 10 21 01 54 93 4.9 -9 664.40 -54.6 -50.8 -53.0 71 -99 SPO 1997 10 21 01 55 93 4.9 -9 664.40 -54.6 -50.8 -53.1 71 -99 SPO 1997 10 21 01 56 92 5.0 -9 664.40 -54.6 -50.8 -53.2 71 -99 SPO 1997 10 21 01 57 92 5.0 -9 664.40 -54.7 -50.7 -53.1 71 -99 SPO 1997 10 21 01 58 91 5.0 -9 664.40 -54.6 -50.6 -53.1 71 -99 SPO 1997 10 21 01 59 90 5.1 -9 664.40 -54.6 -50.4 -53.1 71 -99 SPO 1997 10 21 02 00 88 5.1 -9 664.40 -54.5 -50.4 -53.2 70 0 SPO 1997 10 21 02 01 87 5.2 -9 664.40 -54.4 -50.3 -53.2 69 -99 SPO 1997 10 21 02 02 87 5.2 -9 664.40 -54.4 -50.2 -53.2 69 -99 SPO 1997 10 21 02 03 87 5.2 -9 664.40 -54.4 -50.2 -53.2 67 -99 SPO 1997 10 21 02 04 86 5.2 -9 664.40 -54.4 -50.2 -53.2 67 -99 SPO 1997 10 21 02 05 86 5.2 -9 664.40 -54.3 -50.2 -53.2 67 -99 SPO 1997 10 21 02 06 85 5.3 -9 664.30 -54.3 -50.2 -53.2 68 -99 SPO 1997 10 21 02 07 84 5.3 -9 664.30 -54.3 -50.1 -53.2 68 -99 SPO 1997 10 21 02 08 84 5.3 -9 664.40 -54.2 -50.2 -53.2 67 -99 SPO 1997 10 21 02 09 83 5.2 -9 664.30 -54.2 -50.2 -53.2 68 -99 SPO 1997 10 21 02 10 85 5.2 -9 664.30 -54.2 -50.2 -53.1 70 -99 SPO 1997 10 21 02 11 86 5.2 -9 664.30 -54.2 -50.2 -53.0 70 -99 SPO 1997 10 21 02 12 88 5.1 -9 664.40 -54.2 -50.2 -52.9 68 -99 SPO 1997 10 21 02 13 89 4.9 -9 664.40 -54.2 -50.4 -52.8 68 -99 SPO 1997 10 21 02 14 91 4.8 -9 664.40 -54.4 -50.6 -52.8 70 -99 SPO 1997 10 21 02 15 92 4.7 -9 664.40 -54.4 -50.7 -52.8 70 -99 SPO 1997 10 21 02 16 95 4.7 -9 664.40 -54.6 -50.9 -52.8 71 -99 SPO 1997 10 21 02 17 96 4.7 -9 664.40 -54.6 -51.0 -52.9 71 -99 SPO 1997 10 21 02 18 96 4.6 -9 664.40 -54.7 -51.0 -53.0 70 -99 SPO 1997 10 21 02 19 96 4.6 -9 664.40 -54.8 -51.0 -53.0 71 -99 SPO 1997 10 21 02 20 96 4.6 -9 664.40 -54.9 -51.1 -53.0 70 -99 SPO 1997 10 21 02 21 97 4.6 -9 664.40 -55.0 -51.1 -53.2 71 -99 SPO 1997 10 21 02 22 96 4.7 -9 664.40 -55.1 -51.2 -53.2 71 -99 SPO 1997 10 21 02 23 94 4.8 -9 664.30 -55.1 -51.2 -53.2 71 -99 SPO 1997 10 21 02 24 94 4.9 -9 664.30 -55.2 -51.2 -53.2 71 -99 SPO 1997 10 21 02 25 94 4.9 -9 664.30 -55.2 -51.2 -53.2 71 -99 SPO 1997 10 21 02 26 95 4.9 -9 664.30 -55.2 -51.1 -53.3 71 -99 SPO 1997 10 21 02 27 94 4.9 -9 664.30 -55.2 -51.0 -53.3 70 -99 SPO 1997 10 21 02 28 95 4.8 -9 664.30 -55.1 -50.9 -53.2 71 -99 SPO 1997 10 21 02 29 95 4.8 -9 664.30 -55.0 -50.8 -53.2 68 -99 SPO 1997 10 21 02 30 95 4.8 -9 664.30 -55.0 -50.7 -53.2 68 -99 SPO 1997 10 21 02 31 95 4.7 -9 664.30 -55.0 -50.6 -53.1 68 -99 SPO 1997 10 21 02 32 96 4.6 -9 664.30 -54.9 -50.6 -53.1 67 -99 SPO 1997 10 21 02 33 97 4.6 -9 664.30 -54.9 -50.7 -53.0 67 -99 SPO 1997 10 21 02 34 98 4.5 -9 664.30 -54.9 -50.8 -53.1 69 -99 SPO 1997 10 21 02 35 98 4.5 -9 664.30 -54.9 -50.7 -53.1 69 -99 SPO 1997 10 21 02 36 98 4.5 -9 664.30 -54.9 -50.8 -53.1 69 -99 SPO 1997 10 21 02 37 97 4.5 -9 664.30 -54.9 -50.9 -53.1 69 -99 SPO 1997 10 21 02 38 98 4.6 -9 664.30 -55.0 -51.0 -53.1 70 -99 SPO 1997 10 21 02 39 98 4.6 -9 664.30 -55.0 -51.0 -53.1 70 -99 SPO 1997 10 21 02 40 97 4.7 -9 664.30 -55.0 -51.0 -53.1 70 -99 SPO 1997 10 21 02 41 98 4.7 -9 664.30 -55.0 -50.9 -53.1 70 -99 SPO 1997 10 21 02 42 98 4.7 -9 664.30 -54.8 -50.8 -53.0 69 -99 SPO 1997 10 21 02 43 98 4.7 -9 664.30 -54.8 -50.9 -53.0 69 -99 SPO 1997 10 21 02 44 99 4.7 -9 664.30 -54.8 -50.8 -53.0 69 -99 SPO 1997 10 21 02 45 99 4.6 -9 664.30 -54.7 -50.8 -53.0 68 -99 SPO 1997 10 21 02 46 99 4.6 -9 664.30 -54.7 -50.9 -53.1 68 -99 SPO 1997 10 21 02 47 99 4.6 -9 664.40 -54.6 -50.9 -53.0 69 -99 SPO 1997 10 21 02 48 99 4.7 -9 664.40 -54.6 -50.9 -52.9 69 -99 SPO 1997 10 21 02 49 98 4.7 -9 664.40 -54.5 -50.8 -52.8 68 -99 SPO 1997 10 21 02 50 97 4.8 -9 664.40 -54.5 -50.7 -52.8 70 -99 SPO 1997 10 21 02 51 96 4.9 -9 664.40 -54.4 -50.5 -52.8 69 -99 SPO 1997 10 21 02 52 95 4.9 -9 664.30 -54.3 -50.2 -52.8 68 -99 SPO 1997 10 21 02 53 97 4.9 -9 664.30 -54.3 -50.1 -52.8 69 -99 SPO 1997 10 21 02 54 98 4.8 -9 664.30 -54.3 -50.2 -52.7 69 -99 SPO 1997 10 21 02 55 100 4.8 -9 664.30 -54.4 -50.4 -52.7 70 -99 SPO 1997 10 21 02 56 103 4.7 -9 664.30 -54.4 -50.6 -52.8 70 -99 SPO 1997 10 21 02 57 106 4.7 -9 664.30 -54.4 -50.7 -52.9 69 -99 SPO 1997 10 21 02 58 106 4.7 -9 664.30 -54.4 -50.7 -53.0 69 -99 SPO 1997 10 21 02 59 106 4.7 -9 664.30 -54.3 -50.7 -52.8 68 -99 SPO 1997 10 21 03 00 106 4.7 -9 664.30 -54.3 -50.6 -52.8 68 0 SPO 1997 10 21 03 01 107 4.7 -9 664.30 -54.2 -50.7 -52.8 67 -99 SPO 1997 10 21 03 02 106 4.7 -9 664.30 -54.2 -50.8 -52.7 68 -99 SPO 1997 10 21 03 03 105 4.6 -9 664.30 -54.2 -50.7 -52.7 70 -99 SPO 1997 10 21 03 04 106 4.6 -9 664.30 -54.3 -50.6 -52.8 71 -99 SPO 1997 10 21 03 05 107 4.6 -9 664.30 -54.4 -50.7 -52.9 72 -99 SPO 1997 10 21 03 06 107 4.6 -9 664.30 -54.6 -50.8 -53.1 73 -99 SPO 1997 10 21 03 07 106 4.7 -9 664.30 -54.7 -50.9 -53.3 72 -99 SPO 1997 10 21 03 08 102 4.7 -9 664.30 -54.7 -50.9 -53.2 71 -99 SPO 1997 10 21 03 09 99 4.8 -9 664.30 -54.7 -50.9 -53.1 71 -99 SPO 1997 10 21 03 10 98 4.9 -9 664.30 -54.6 -50.8 -53.0 69 -99 SPO 1997 10 21 03 11 99 4.8 -9 664.30 -54.7 -50.9 -53.0 70 -99 SPO 1997 10 21 03 12 100 4.8 -9 664.30 -54.7 -51.0 -53.0 68 -99 SPO 1997 10 21 03 13 100 5.0 -9 664.30 -54.7 -51.1 -53.1 68 -99 SPO 1997 10 21 03 14 99 5.2 -9 664.30 -54.7 -51.1 -53.1 68 -99 SPO 1997 10 21 03 15 97 5.4 -9 664.30 -54.5 -51.1 -53.0 68 -99 SPO 1997 10 21 03 16 96 5.4 -9 664.30 -54.3 -51.0 -52.9 67 -99 SPO 1997 10 21 03 17 98 5.4 -9 664.30 -54.2 -51.0 -52.8 67 -99 SPO 1997 10 21 03 18 99 5.2 -9 664.30 -54.2 -51.1 -52.8 67 -99 SPO 1997 10 21 03 19 100 5.2 -9 664.30 -54.3 -51.2 -52.9 69 -99 SPO 1997 10 21 03 20 99 5.2 -9 664.20 -54.4 -51.2 -52.9 70 -99 SPO 1997 10 21 03 21 98 5.3 -9 664.20 -54.4 -51.2 -52.9 70 -99 SPO 1997 10 21 03 22 98 5.4 -9 664.20 -54.4 -51.1 -52.9 69 -99 SPO 1997 10 21 03 23 98 5.4 -9 664.20 -54.3 -51.1 -52.8 68 -99 SPO 1997 10 21 03 24 98 5.3 -9 664.20 -54.3 -51.1 -52.9 68 -99 SPO 1997 10 21 03 25 97 5.4 -9 664.20 -54.3 -51.0 -52.9 68 -99 SPO 1997 10 21 03 26 96 5.5 -9 664.20 -54.3 -51.0 -52.9 68 -99 SPO 1997 10 21 03 27 95 5.4 -9 664.20 -54.3 -51.0 -52.9 68 -99 SPO 1997 10 21 03 28 94 5.3 -9 664.20 -54.3 -51.0 -52.9 68 -99 SPO 1997 10 21 03 29 94 5.2 -9 664.20 -54.4 -51.0 -52.9 70 -99 SPO 1997 10 21 03 30 94 5.1 -9 664.20 -54.4 -51.1 -52.8 70 -99 SPO 1997 10 21 03 31 95 5.0 -9 664.20 -54.4 -51.2 -52.8 69 -99 SPO 1997 10 21 03 32 95 4.8 -9 664.20 -54.5 -51.4 -52.8 71 -99 SPO 1997 10 21 03 33 95 4.9 -9 664.20 -54.6 -51.4 -52.9 71 -99 SPO 1997 10 21 03 34 94 4.9 -9 664.20 -54.6 -51.4 -52.9 71 -99 SPO 1997 10 21 03 35 93 4.9 -9 664.20 -54.6 -51.3 -52.9 71 -99 SPO 1997 10 21 03 36 92 4.8 -9 664.10 -54.7 -51.2 -52.9 71 -99 SPO 1997 10 21 03 37 91 4.9 -9 664.10 -54.7 -51.2 -52.9 70 -99 SPO 1997 10 21 03 38 90 4.9 -9 664.10 -54.8 -51.2 -52.9 71 -99 SPO 1997 10 21 03 39 90 4.9 -9 664.10 -54.8 -51.2 -52.9 71 -99 SPO 1997 10 21 03 40 89 5.0 -9 664.10 -54.7 -51.1 -52.9 70 -99 SPO 1997 10 21 03 41 88 5.0 -9 664.10 -54.7 -51.1 -53.0 70 -99 SPO 1997 10 21 03 42 89 5.0 -9 664.10 -54.6 -51.1 -53.0 69 -99 SPO 1997 10 21 03 43 89 5.0 -9 664.10 -54.6 -51.0 -53.0 69 -99 SPO 1997 10 21 03 44 89 5.0 -9 664.10 -54.5 -51.0 -53.0 68 -99 SPO 1997 10 21 03 45 90 5.0 -9 664.00 -54.5 -51.0 -52.9 70 -99 SPO 1997 10 21 03 46 91 4.8 -9 664.00 -54.6 -51.0 -52.9 71 -99 SPO 1997 10 21 03 47 91 4.7 -9 664.00 -54.6 -51.1 -52.9 71 -99 SPO 1997 10 21 03 48 92 4.7 -9 664.10 -54.6 -51.1 -52.9 71 -99 SPO 1997 10 21 03 49 93 4.7 -9 664.10 -54.7 -51.2 -52.9 71 -99 SPO 1997 10 21 03 50 94 4.8 -9 664.00 -54.8 -51.2 -53.0 72 -99 SPO 1997 10 21 03 51 93 4.7 -9 664.00 -54.8 -51.2 -53.0 71 -99 SPO 1997 10 21 03 52 92 4.8 -9 664.00 -54.9 -51.2 -53.1 71 -99 SPO 1997 10 21 03 53 91 4.9 -9 664.00 -55.0 -51.1 -53.1 71 -99 SPO 1997 10 21 03 54 90 5.0 -9 664.00 -55.0 -51.0 -53.2 70 -99 SPO 1997 10 21 03 55 89 5.2 -9 664.00 -55.0 -50.9 -53.2 70 -99 SPO 1997 10 21 03 56 90 5.2 -9 664.00 -54.9 -50.9 -53.2 69 -99 SPO 1997 10 21 03 57 91 5.2 -9 664.00 -54.7 -50.8 -53.1 68 -99 SPO 1997 10 21 03 58 92 5.1 -9 664.00 -54.6 -50.8 -53.1 69 -99 SPO 1997 10 21 03 59 94 5.1 -9 664.00 -54.6 -50.8 -53.1 69 -99 SPO 1997 10 21 04 00 95 5.1 -9 664.00 -54.7 -50.9 -53.0 70 0 SPO 1997 10 21 04 01 97 5.1 -9 664.00 -54.7 -51.0 -53.0 70 -99 SPO 1997 10 21 04 02 99 5.0 -9 664.00 -54.6 -51.0 -53.2 69 -99 SPO 1997 10 21 04 03 101 4.7 -9 664.10 -54.7 -51.1 -53.4 70 -99 SPO 1997 10 21 04 04 103 4.5 -9 664.10 -54.8 -51.1 -53.7 69 -99 SPO 1997 10 21 04 05 105 4.6 -9 664.10 -54.9 -51.2 -53.9 69 -99 SPO 1997 10 21 04 06 108 4.6 -9 664.10 -54.8 -51.2 -53.9 68 -99 SPO 1997 10 21 04 07 110 4.6 -9 664.10 -54.9 -51.2 -53.9 70 -99 SPO 1997 10 21 04 08 110 4.7 -9 664.10 -54.9 -51.2 -54.0 70 -99 SPO 1997 10 21 04 09 109 4.6 -9 664.10 -54.8 -51.1 -53.8 69 -99 SPO 1997 10 21 04 10 107 4.7 -9 664.10 -54.6 -51.1 -53.6 67 -99 SPO 1997 10 21 04 11 107 4.8 -9 664.10 -54.6 -51.2 -53.5 69 -99 SPO 1997 10 21 04 12 107 4.6 -9 664.10 -54.6 -51.2 -53.5 69 -99 SPO 1997 10 21 04 13 105 4.7 -9 664.00 -54.5 -51.2 -53.4 68 -99 SPO 1997 10 21 04 14 103 4.7 -9 664.00 -54.5 -51.1 -53.2 70 -99 SPO 1997 10 21 04 15 102 4.8 -9 664.00 -54.4 -51.1 -53.0 69 -99 SPO 1997 10 21 04 16 103 4.9 -9 664.00 -54.3 -51.1 -52.9 68 -99 SPO 1997 10 21 04 17 105 4.9 -9 664.00 -54.2 -51.1 -52.8 67 -99 SPO 1997 10 21 04 18 106 4.8 -9 664.00 -54.2 -51.2 -52.9 67 -99 SPO 1997 10 21 04 19 105 4.9 -9 664.00 -54.4 -51.3 -53.0 69 -99 SPO 1997 10 21 04 20 104 5.0 -9 664.00 -54.4 -51.3 -53.0 69 -99 SPO 1997 10 21 04 21 104 5.0 -9 664.00 -54.3 -51.3 -53.0 69 -99 SPO 1997 10 21 04 22 104 5.0 -9 663.90 -54.3 -51.3 -53.0 69 -99 SPO 1997 10 21 04 23 104 5.0 -9 663.90 -54.4 -51.3 -53.1 70 -99 SPO 1997 10 21 04 24 104 5.2 -9 663.90 -54.4 -51.3 -53.1 72 -99 SPO 1997 10 21 04 25 102 5.2 -9 663.90 -54.4 -51.3 -53.0 72 -99 SPO 1997 10 21 04 26 101 5.3 -9 663.90 -54.2 -51.2 -52.9 70 -99 SPO 1997 10 21 04 27 102 5.3 -9 663.90 -54.1 -51.3 -52.9 69 -99 SPO 1997 10 21 04 28 103 5.2 -9 663.90 -54.1 -51.3 -52.9 69 -99 SPO 1997 10 21 04 29 103 5.2 -9 663.90 -54.1 -51.3 -52.9 69 -99 SPO 1997 10 21 04 30 102 5.3 -9 663.90 -54.1 -51.3 -52.9 69 -99 SPO 1997 10 21 04 31 102 5.3 -9 663.90 -54.1 -51.2 -52.9 69 -99 SPO 1997 10 21 04 32 102 5.3 -9 663.90 -54.1 -51.2 -52.9 69 -99 SPO 1997 10 21 04 33 101 5.3 -9 663.90 -54.1 -51.2 -52.9 69 -99 SPO 1997 10 21 04 34 100 5.3 -9 663.90 -54.0 -51.2 -52.9 68 -99 SPO 1997 10 21 04 35 99 5.3 -9 663.90 -54.0 -51.2 -52.9 68 -99 SPO 1997 10 21 04 36 98 5.4 -9 663.90 -54.1 -51.1 -52.9 69 -99 SPO 1997 10 21 04 37 96 5.4 -9 663.90 -54.1 -51.1 -52.9 69 -99 SPO 1997 10 21 04 38 94 5.5 -9 663.90 -54.1 -51.1 -52.9 69 -99 SPO 1997 10 21 04 39 94 5.5 -9 663.90 -54.1 -51.1 -52.9 69 -99 SPO 1997 10 21 04 40 95 5.4 -9 663.90 -54.2 -51.1 -53.0 70 -99 SPO 1997 10 21 04 41 95 5.4 -9 663.90 -54.2 -51.0 -53.0 70 -99 SPO 1997 10 21 04 42 95 5.4 -9 663.90 -54.1 -51.0 -53.0 69 -99 SPO 1997 10 21 04 43 93 5.5 -9 663.90 -54.1 -51.0 -53.0 69 -99 SPO 1997 10 21 04 44 94 5.7 -9 663.90 -54.0 -51.0 -52.9 68 -99 SPO 1997 10 21 04 45 94 5.8 -9 663.90 -53.9 -51.0 -52.9 67 -99 SPO 1997 10 21 04 46 94 5.9 -9 663.90 -53.8 -50.9 -52.8 67 -99 SPO 1997 10 21 04 47 94 5.9 -9 663.90 -53.7 -50.8 -52.8 67 -99 SPO 1997 10 21 04 48 94 5.9 -9 663.90 -53.7 -50.8 -52.8 68 -99 SPO 1997 10 21 04 49 95 6.0 -9 663.90 -53.7 -50.8 -52.8 70 -99 SPO 1997 10 21 04 50 94 6.2 -9 663.90 -53.8 -50.8 -52.9 71 -99 SPO 1997 10 21 04 51 94 6.3 -9 663.90 -53.8 -50.8 -52.9 71 -99 SPO 1997 10 21 04 52 93 6.2 -9 663.90 -53.7 -50.8 -52.9 70 -99 SPO 1997 10 21 04 53 93 6.3 -9 663.90 -53.7 -50.8 -52.9 70 -99 SPO 1997 10 21 04 54 92 6.3 -9 663.90 -53.7 -50.9 -52.9 70 -99 SPO 1997 10 21 04 55 92 6.1 -9 663.90 -53.6 -50.9 -52.9 69 -99 SPO 1997 10 21 04 56 93 5.9 -9 663.90 -53.6 -50.9 -52.9 69 -99 SPO 1997 10 21 04 57 94 5.9 -9 663.90 -53.6 -50.9 -52.9 69 -99 SPO 1997 10 21 04 58 94 5.9 -9 663.90 -53.7 -51.0 -52.9 70 -99 SPO 1997 10 21 04 59 95 5.9 -9 663.90 -53.7 -51.0 -52.9 68 -99 SPO 1997 10 21 05 00 94 6.0 -9 663.80 -53.6 -51.0 -52.9 68 0 SPO 1997 10 21 05 01 94 6.0 -9 663.80 -53.6 -51.1 -52.9 69 -99 SPO 1997 10 21 05 02 94 5.9 -9 663.80 -53.5 -51.0 -52.9 68 -99 SPO 1997 10 21 05 03 95 6.0 -9 663.80 -53.5 -51.1 -52.8 68 -99 SPO 1997 10 21 05 04 96 5.9 -9 663.80 -53.6 -51.1 -52.8 69 -99 SPO 1997 10 21 05 05 96 5.9 -9 663.80 -53.6 -51.1 -52.9 69 -99 SPO 1997 10 21 05 06 97 5.9 -9 663.80 -53.6 -51.1 -52.9 69 -99 SPO 1997 10 21 05 07 98 5.9 -9 663.80 -53.6 -51.2 -52.9 69 -99 SPO 1997 10 21 05 08 98 5.8 -9 663.80 -53.6 -51.2 -52.9 69 -99 SPO 1997 10 21 05 09 99 5.8 -9 663.80 -53.7 -51.2 -52.9 68 -99 SPO 1997 10 21 05 10 98 5.7 -9 663.80 -53.7 -51.3 -52.9 68 -99 SPO 1997 10 21 05 11 99 5.5 -9 663.80 -53.7 -51.4 -53.0 67 -99 SPO 1997 10 21 05 12 99 5.4 -9 663.80 -53.8 -51.4 -53.0 68 -99 SPO 1997 10 21 05 13 99 5.3 -9 663.80 -53.9 -51.4 -53.1 69 -99 SPO 1997 10 21 05 14 100 5.1 -9 663.80 -53.9 -51.5 -53.1 69 -99 SPO 1997 10 21 05 15 100 5.0 -9 663.90 -53.9 -51.5 -53.1 69 -99 SPO 1997 10 21 05 16 101 4.9 -9 663.90 -53.8 -51.5 -53.1 68 -99 SPO 1997 10 21 05 17 101 5.0 -9 663.90 -53.9 -51.4 -53.1 69 -99 SPO 1997 10 21 05 18 101 5.0 -9 663.80 -53.9 -51.4 -53.1 69 -99 SPO 1997 10 21 05 19 100 5.1 -9 663.80 -53.8 -51.5 -53.0 68 -99 SPO 1997 10 21 05 20 99 5.1 -9 663.80 -53.8 -51.4 -53.0 68 -99 SPO 1997 10 21 05 21 99 5.0 -9 663.80 -53.8 -51.4 -52.9 68 -99 SPO 1997 10 21 05 22 101 5.0 -9 663.90 -53.9 -51.4 -53.0 69 -99 SPO 1997 10 21 05 23 102 5.0 -9 663.90 -53.9 -51.5 -53.1 69 -99 SPO 1997 10 21 05 24 104 5.1 -9 663.90 -53.9 -51.5 -53.1 67 -99 SPO 1997 10 21 05 25 105 5.3 -9 663.90 -53.9 -51.5 -53.2 67 -99 SPO 1997 10 21 05 26 105 5.4 -9 663.90 -54.0 -51.5 -53.2 68 -99 SPO 1997 10 21 05 27 105 5.4 -9 663.90 -54.0 -51.5 -53.2 68 -99 SPO 1997 10 21 05 28 104 5.4 -9 663.90 -54.0 -51.5 -53.2 68 -99 SPO 1997 10 21 05 29 103 5.4 -9 663.90 -54.0 -51.5 -53.2 68 -99 SPO 1997 10 21 05 30 101 5.4 -9 663.90 -54.0 -51.5 -53.1 68 -99 SPO 1997 10 21 05 31 101 5.3 -9 663.90 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 32 102 5.2 -9 663.90 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 33 101 5.3 -9 663.90 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 34 100 5.3 -9 663.90 -53.9 -51.5 -53.0 67 -99 SPO 1997 10 21 05 35 100 5.3 -9 663.90 -53.9 -51.5 -53.0 67 -99 SPO 1997 10 21 05 36 100 5.3 -9 663.90 -53.9 -51.5 -53.0 67 -99 SPO 1997 10 21 05 37 100 5.3 -9 663.90 -53.8 -51.5 -52.9 67 -99 SPO 1997 10 21 05 38 101 5.1 -9 663.90 -53.9 -51.5 -52.9 67 -99 SPO 1997 10 21 05 39 101 5.0 -9 663.90 -53.9 -51.5 -52.9 67 -99 SPO 1997 10 21 05 40 102 5.0 -9 663.90 -53.9 -51.5 -52.9 67 -99 SPO 1997 10 21 05 41 101 5.0 -9 663.90 -53.9 -51.5 -52.9 67 -99 SPO 1997 10 21 05 42 101 5.0 -9 663.90 -53.9 -51.4 -52.9 67 -99 SPO 1997 10 21 05 43 101 5.0 -9 663.90 -53.9 -51.4 -52.9 67 -99 SPO 1997 10 21 05 44 100 5.0 -9 663.90 -54.0 -51.4 -53.0 68 -99 SPO 1997 10 21 05 45 99 5.1 -9 663.90 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 46 99 5.1 -9 663.80 -54.1 -51.5 -53.0 69 -99 SPO 1997 10 21 05 47 98 5.0 -9 663.80 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 48 98 5.0 -9 663.90 -54.0 -51.5 -53.0 68 -99 SPO 1997 10 21 05 49 100 4.8 -9 663.90 -54.1 -51.5 -53.0 69 -99 SPO 1997 10 21 05 50 103 4.7 -9 663.90 -54.1 -51.5 -53.0 69 -99 SPO 1997 10 21 05 51 104 4.8 -9 663.90 -54.2 -51.5 -53.1 70 -99 SPO 1997 10 21 05 52 105 4.8 -9 663.90 -54.2 -51.4 -53.2 68 -99 SPO 1997 10 21 05 53 104 4.9 -9 663.90 -54.3 -51.4 -53.2 68 -99 SPO 1997 10 21 05 54 103 4.9 -9 663.90 -54.3 -51.4 -53.2 68 -99 SPO 1997 10 21 05 55 102 5.0 -9 663.90 -54.3 -51.3 -53.2 68 -99 SPO 1997 10 21 05 56 101 5.0 -9 663.90 -54.3 -51.3 -53.1 68 -99 SPO 1997 10 21 05 57 101 5.0 -9 663.90 -54.2 -51.3 -53.1 67 -99 SPO 1997 10 21 05 58 99 5.0 -9 663.90 -54.2 -51.3 -53.0 67 -99 SPO 1997 10 21 05 59 97 5.0 -9 663.90 -54.1 -51.2 -53.0 67 -99 SPO 1997 10 21 06 00 95 5.1 -9 663.90 -54.1 -51.2 -52.9 67 0 SPO 1997 10 21 06 01 94 5.1 -9 663.80 -54.1 -51.2 -52.9 67 -99 SPO 1997 10 21 06 02 93 5.2 -9 663.80 -54.0 -51.2 -52.9 67 -99 SPO 1997 10 21 06 03 90 5.1 -9 663.80 -54.0 -51.2 -52.9 67 -99 SPO 1997 10 21 06 04 89 5.2 -9 663.70 -54.0 -51.1 -52.8 67 -99 SPO 1997 10 21 06 05 91 5.2 -9 663.70 -53.9 -51.1 -52.7 66 -99 SPO 1997 10 21 06 06 91 5.1 -9 663.70 -53.9 -51.0 -52.7 66 -99 SPO 1997 10 21 06 07 92 5.2 -9 663.80 -53.8 -51.0 -52.7 65 -99 SPO 1997 10 21 06 08 93 5.1 -9 663.80 -53.9 -51.0 -52.7 66 -99 SPO 1997 10 21 06 09 92 5.1 -9 663.70 -54.0 -51.0 -52.7 67 -99 SPO 1997 10 21 06 10 92 5.2 -9 663.70 -54.0 -51.0 -52.8 68 -99 SPO 1997 10 21 06 11 93 5.1 -9 663.70 -54.0 -51.0 -52.8 68 -99 SPO 1997 10 21 06 12 95 5.2 -9 663.70 -54.1 -51.0 -52.8 69 -99 SPO 1997 10 21 06 13 96 5.2 -9 663.70 -54.2 -51.0 -52.8 68 -99 SPO 1997 10 21 06 14 97 5.1 -9 663.70 -54.2 -50.9 -52.9 68 -99 SPO 1997 10 21 06 15 99 5.0 -9 663.70 -54.2 -51.0 -52.9 68 -99 SPO 1997 10 21 06 16 99 4.9 -9 663.70 -54.2 -51.0 -52.9 67 -99 SPO 1997 10 21 06 17 100 4.9 -9 663.70 -54.2 -51.0 -52.9 67 -99 SPO 1997 10 21 06 18 101 4.8 -9 663.70 -54.2 -51.0 -52.8 67 -99 SPO 1997 10 21 06 19 99 4.8 -9 663.70 -54.2 -51.0 -52.8 66 -99 SPO 1997 10 21 06 20 97 4.8 -9 663.70 -54.2 -51.1 -52.8 66 -99 SPO 1997 10 21 06 21 97 4.7 -9 663.70 -54.3 -51.0 -52.8 67 -99 SPO 1997 10 21 06 22 98 4.8 -9 663.70 -54.4 -51.1 -52.8 67 -99 SPO 1997 10 21 06 23 100 4.8 -9 663.70 -54.5 -51.1 -52.9 68 -99 SPO 1997 10 21 06 24 100 4.8 -9 663.70 -54.6 -51.1 -53.0 69 -99 SPO 1997 10 21 06 25 99 4.9 -9 663.70 -54.6 -51.1 -53.0 69 -99 SPO 1997 10 21 06 26 97 4.9 -9 663.70 -54.5 -51.1 -52.9 68 -99 SPO 1997 10 21 06 27 96 4.9 -9 663.70 -54.6 -51.1 -52.9 69 -99 SPO 1997 10 21 06 28 94 5.1 -9 663.60 -54.5 -51.0 -53.0 68 -99 SPO 1997 10 21 06 29 92 5.3 -9 663.60 -54.4 -51.0 -53.0 67 -99 SPO 1997 10 21 06 30 90 5.3 -9 663.60 -54.4 -51.0 -52.9 67 -99 SPO 1997 10 21 06 31 90 5.3 -9 663.60 -54.4 -51.0 -52.9 67 -99 SPO 1997 10 21 06 32 90 5.3 -9 663.60 -54.4 -51.0 -53.0 67 -99 SPO 1997 10 21 06 33 91 5.3 -9 663.60 -54.3 -51.0 -52.9 67 -99 SPO 1997 10 21 06 34 92 5.2 -9 663.60 -54.2 -51.0 -52.8 66 -99 SPO 1997 10 21 06 35 93 5.2 -9 663.60 -54.1 -51.1 -52.8 65 -99 SPO 1997 10 21 06 36 94 5.3 -9 663.60 -54.0 -51.2 -52.7 64 -99 SPO 1997 10 21 06 37 95 5.2 -9 663.60 -54.1 -51.2 -52.7 67 -99 SPO 1997 10 21 06 38 96 5.3 -9 663.60 -54.1 -51.3 -52.7 67 -99 SPO 1997 10 21 06 39 96 5.4 -9 663.60 -54.1 -51.4 -52.7 67 -99 SPO 1997 10 21 06 40 96 5.4 -9 663.60 -54.1 -51.4 -52.7 67 -99 SPO 1997 10 21 06 41 95 5.4 -9 663.60 -54.1 -51.4 -52.7 67 -99 SPO 1997 10 21 06 42 95 5.4 -9 663.60 -54.0 -51.4 -52.7 67 -99 SPO 1997 10 21 06 43 95 5.5 -9 663.60 -54.0 -51.4 -52.7 68 -99 SPO 1997 10 21 06 44 95 5.4 -9 663.60 -54.0 -51.4 -52.7 68 -99 SPO 1997 10 21 06 45 96 5.4 -9 663.60 -54.0 -51.3 -52.7 68 -99 SPO 1997 10 21 06 46 95 5.4 -9 663.60 -54.1 -51.3 -52.7 69 -99 SPO 1997 10 21 06 47 95 5.4 -9 663.60 -54.1 -51.4 -52.7 67 -99 SPO 1997 10 21 06 48 96 5.4 -9 663.60 -54.1 -51.4 -52.7 67 -99 SPO 1997 10 21 06 49 98 5.3 -9 663.60 -54.2 -51.5 -52.7 67 -99 SPO 1997 10 21 06 50 102 5.3 -9 663.60 -54.2 -51.4 -52.8 67 -99 SPO 1997 10 21 06 51 104 5.4 -9 663.60 -54.2 -51.4 -52.9 68 -99 SPO 1997 10 21 06 52 103 5.5 -9 663.60 -54.2 -51.4 -52.9 68 -99 SPO 1997 10 21 06 53 103 5.5 -9 663.60 -54.2 -51.4 -53.0 67 -99 SPO 1997 10 21 06 54 105 5.4 -9 663.60 -54.2 -51.4 -53.1 67 -99 SPO 1997 10 21 06 55 107 5.5 -9 663.60 -54.2 -51.4 -53.2 67 -99 SPO 1997 10 21 06 56 107 5.6 -9 663.60 -54.3 -51.5 -53.3 68 -99 SPO 1997 10 21 06 57 107 5.7 -9 663.60 -54.3 -51.5 -53.2 68 -99 SPO 1997 10 21 06 58 107 5.6 -9 663.60 -54.2 -51.5 -53.1 67 -99 SPO 1997 10 21 06 59 106 5.6 -9 663.60 -54.0 -51.4 -53.0 66 -99 SPO 1997 10 21 07 00 107 5.6 -9 663.60 -54.0 -51.4 -52.9 66 0 SPO 1997 10 21 07 01 110 5.5 -9 663.60 -54.0 -51.5 -53.0 66 -99 SPO 1997 10 21 07 02 111 5.4 -9 663.60 -54.0 -51.5 -53.1 66 -99 SPO 1997 10 21 07 03 111 5.4 -9 663.60 -54.2 -51.5 -53.2 67 -99 SPO 1997 10 21 07 04 109 5.3 -9 663.60 -54.2 -51.5 -53.3 67 -99 SPO 1997 10 21 07 05 107 5.3 -9 663.60 -54.2 -51.5 -53.2 67 -99 SPO 1997 10 21 07 06 107 5.1 -9 663.50 -54.2 -51.6 -53.2 67 -99 SPO 1997 10 21 07 07 109 5.0 -9 663.50 -54.4 -51.6 -53.3 69 -99 SPO 1997 10 21 07 08 108 5.1 -9 663.50 -54.4 -51.6 -53.4 69 -99 SPO 1997 10 21 07 09 106 5.1 -9 663.50 -54.4 -51.6 -53.4 69 -99 SPO 1997 10 21 07 10 107 5.1 -9 663.50 -54.4 -51.6 -53.4 67 -99 SPO 1997 10 21 07 11 112 5.0 -9 663.60 -54.5 -51.6 -53.6 68 -99 SPO 1997 10 21 07 12 116 5.1 -9 663.60 -54.6 -51.6 -53.8 69 -99 SPO 1997 10 21 07 13 117 5.1 -9 663.60 -54.7 -51.7 -53.9 68 -99 SPO 1997 10 21 07 14 115 5.2 -9 663.60 -54.8 -51.8 -53.9 68 -99 SPO 1997 10 21 07 15 112 5.3 -9 663.60 -54.6 -51.8 -53.8 66 -99 SPO 1997 10 21 07 16 108 5.3 -9 663.60 -54.5 -51.7 -53.6 66 -99 SPO 1997 10 21 07 17 105 5.2 -9 663.50 -54.4 -51.6 -53.4 65 -99 SPO 1997 10 21 07 18 104 5.2 -9 663.50 -54.4 -51.5 -53.2 66 -99 SPO 1997 10 21 07 19 104 5.2 -9 663.60 -54.3 -51.5 -53.1 67 -99 SPO 1997 10 21 07 20 104 5.3 -9 663.60 -54.3 -51.5 -53.1 67 -99 SPO 1997 10 21 07 21 102 5.4 -9 663.50 -54.3 -51.5 -53.1 67 -99 SPO 1997 10 21 07 22 100 5.5 -9 663.50 -54.4 -51.5 -53.0 69 -99 SPO 1997 10 21 07 23 95 5.6 -9 663.50 -54.4 -51.5 -52.9 69 -99 SPO 1997 10 21 07 24 92 5.7 -9 663.50 -54.4 -51.4 -52.9 69 -99 SPO 1997 10 21 07 25 91 5.7 -9 663.50 -54.3 -51.4 -52.9 68 -99 SPO 1997 10 21 07 26 91 5.7 -9 663.50 -54.2 -51.4 -52.8 67 -99 SPO 1997 10 21 07 27 93 5.7 -9 663.50 -54.0 -51.5 -52.7 66 -99 SPO 1997 10 21 07 28 94 5.7 -9 663.50 -54.0 -51.5 -52.7 66 -99 SPO 1997 10 21 07 29 94 5.8 -9 663.50 -54.0 -51.5 -52.7 66 -99 SPO 1997 10 21 07 30 94 5.6 -9 663.50 -54.0 -51.6 -52.7 66 -99 SPO 1997 10 21 07 31 93 5.6 -9 663.50 -54.1 -51.6 -52.7 67 -99 SPO 1997 10 21 07 32 93 5.7 -9 663.50 -54.1 -51.6 -52.7 67 -99 SPO 1997 10 21 07 33 93 5.9 -9 663.50 -54.1 -51.6 -52.7 67 -99 SPO 1997 10 21 07 34 92 6.1 -9 663.50 -54.1 -51.6 -52.8 67 -99 SPO 1997 10 21 07 35 91 6.1 -9 663.50 -54.1 -51.6 -52.8 67 -99 SPO 1997 10 21 07 36 91 6.1 -9 663.50 -54.1 -51.5 -52.8 67 -99 SPO 1997 10 21 07 37 91 6.0 -9 663.50 -54.0 -51.6 -52.8 67 -99 SPO 1997 10 21 07 38 93 5.9 -9 663.50 -54.0 -51.6 -52.8 67 -99 SPO 1997 10 21 07 39 94 5.8 -9 663.50 -54.1 -51.6 -52.8 67 -99 SPO 1997 10 21 07 40 96 5.8 -9 663.50 -54.1 -51.6 -52.8 67 -99 SPO 1997 10 21 07 41 96 6.0 -9 663.40 -54.1 -51.7 -52.8 67 -99 SPO 1997 10 21 07 42 96 6.0 -9 663.40 -54.1 -51.7 -52.8 67 -99 SPO 1997 10 21 07 43 95 6.1 -9 663.40 -54.2 -51.7 -52.9 67 -99 SPO 1997 10 21 07 44 95 6.0 -9 663.40 -54.1 -51.6 -52.9 67 -99 SPO 1997 10 21 07 45 95 6.1 -9 663.40 -54.1 -51.7 -52.9 67 -99 SPO 1997 10 21 07 46 95 6.1 -9 663.40 -54.0 -51.7 -52.9 67 -99 SPO 1997 10 21 07 47 94 5.9 -9 663.40 -54.0 -51.6 -52.9 67 -99 SPO 1997 10 21 07 48 93 6.0 -9 663.40 -54.2 -51.7 -52.9 68 -99 SPO 1997 10 21 07 49 92 6.1 -9 663.40 -54.2 -51.7 -52.9 68 -99 SPO 1997 10 21 07 50 90 6.2 -9 663.40 -54.2 -51.6 -52.9 68 -99 SPO 1997 10 21 07 51 89 6.2 -9 663.40 -54.1 -51.6 -52.9 67 -99 SPO 1997 10 21 07 52 90 6.2 -9 663.40 -54.1 -51.6 -52.9 67 -99 SPO 1997 10 21 07 53 90 6.2 -9 663.40 -54.1 -51.6 -52.9 67 -99 SPO 1997 10 21 07 54 90 6.2 -9 663.40 -54.1 -51.7 -53.0 67 -99 SPO 1997 10 21 07 55 91 6.2 -9 663.50 -54.2 -51.7 -53.0 67 -99 SPO 1997 10 21 07 56 90 6.1 -9 663.50 -54.2 -51.8 -53.0 67 -99 SPO 1997 10 21 07 57 92 6.1 -9 663.50 -54.3 -51.8 -53.0 68 -99 SPO 1997 10 21 07 58 94 6.1 -9 663.40 -54.4 -51.9 -53.1 69 -99 SPO 1997 10 21 07 59 94 6.1 -9 663.40 -54.4 -51.9 -53.1 69 -99 SPO 1997 10 21 08 00 93 6.0 -9 663.40 -54.4 -52.0 -53.1 69 0 SPO 1997 10 21 08 01 94 6.0 -9 663.40 -54.4 -52.0 -53.2 67 -99 SPO 1997 10 21 08 02 93 6.0 -9 663.40 -54.4 -52.0 -53.2 67 -99 SPO 1997 10 21 08 03 94 5.9 -9 663.40 -54.4 -52.0 -53.2 67 -99 SPO 1997 10 21 08 04 96 5.9 -9 663.40 -54.5 -52.1 -53.2 66 -99 SPO 1997 10 21 08 05 96 6.0 -9 663.40 -54.5 -52.2 -53.2 66 -99 SPO 1997 10 21 08 06 95 6.1 -9 663.30 -54.6 -52.2 -53.3 66 -99 SPO 1997 10 21 08 07 93 6.2 -9 663.30 -54.6 -52.2 -53.3 65 -99 SPO 1997 10 21 08 08 90 6.2 -9 663.30 -54.7 -52.2 -53.4 66 -99 SPO 1997 10 21 08 09 88 6.2 -9 663.30 -54.6 -52.1 -53.3 65 -99 SPO 1997 10 21 08 10 87 6.3 -9 663.30 -54.6 -52.0 -53.3 66 -99 SPO 1997 10 21 08 11 88 6.2 -9 663.30 -54.6 -51.9 -53.4 66 -99 SPO 1997 10 21 08 12 90 6.2 -9 663.30 -54.6 -51.8 -53.4 66 -99 SPO 1997 10 21 08 13 92 6.1 -9 663.30 -54.7 -51.8 -53.4 67 -99 SPO 1997 10 21 08 14 94 6.0 -9 663.30 -54.7 -51.9 -53.4 67 -99 SPO 1997 10 21 08 15 93 5.8 -9 663.30 -54.8 -52.0 -53.4 66 -99 SPO 1997 10 21 08 16 92 5.8 -9 663.30 -54.8 -52.1 -53.4 66 -99 SPO 1997 10 21 08 17 93 5.5 -9 663.30 -54.8 -52.2 -53.4 66 -99 SPO 1997 10 21 08 18 95 5.5 -9 663.30 -54.8 -52.2 -53.4 66 -99 SPO 1997 10 21 08 19 98 5.6 -9 663.40 -54.8 -52.3 -53.5 65 -99 SPO 1997 10 21 08 20 101 5.6 -9 663.40 -54.8 -52.4 -53.6 65 -99 SPO 1997 10 21 08 21 100 5.7 -9 663.40 -54.9 -52.5 -53.7 65 -99 SPO 1997 10 21 08 22 97 6.0 -9 663.40 -54.9 -52.4 -53.6 65 -99 SPO 1997 10 21 08 23 94 6.0 -9 663.30 -54.8 -52.3 -53.6 64 -99 SPO 1997 10 21 08 24 92 5.9 -9 663.30 -54.8 -52.2 -53.5 65 -99 SPO 1997 10 21 08 25 92 5.9 -9 663.30 -54.8 -52.1 -53.5 65 -99 SPO 1997 10 21 08 26 94 5.9 -9 663.40 -54.7 -52.0 -53.4 64 -99 SPO 1997 10 21 08 27 95 5.8 -9 663.40 -54.8 -52.1 -53.5 66 -99 SPO 1997 10 21 08 28 96 5.7 -9 663.40 -54.8 -52.1 -53.5 66 -99 SPO 1997 10 21 08 29 96 5.6 -9 663.40 -54.8 -52.0 -53.5 66 -99 SPO 1997 10 21 08 30 98 5.5 -9 663.40 -54.8 -52.0 -53.5 66 -99 SPO 1997 10 21 08 31 102 5.4 -9 663.40 -54.8 -52.0 -53.6 66 -99 SPO 1997 10 21 08 32 109 5.3 -9 663.40 -55.0 -52.3 -54.0 66 -99 SPO 1997 10 21 08 33 113 5.6 -9 663.40 -55.0 -52.5 -54.2 66 -99 SPO 1997 10 21 08 34 113 5.8 -9 663.40 -55.1 -52.5 -54.4 66 -99 SPO 1997 10 21 08 35 110 6.0 -9 663.40 -55.1 -52.5 -54.4 66 -99 SPO 1997 10 21 08 36 109 6.0 -9 663.40 -54.9 -52.4 -54.2 66 -99 SPO 1997 10 21 08 37 111 5.9 -9 663.40 -54.8 -52.4 -54.1 65 -99 SPO 1997 10 21 08 38 115 5.8 -9 663.40 -54.8 -52.5 -54.2 65 -99 SPO 1997 10 21 08 39 116 5.8 -9 663.40 -54.9 -52.6 -54.2 66 -99 SPO 1997 10 21 08 40 113 5.7 -9 663.40 -54.9 -52.6 -54.3 66 -99 SPO 1997 10 21 08 41 109 5.6 -9 663.40 -54.9 -52.6 -54.2 67 -99 SPO 1997 10 21 08 42 107 5.7 -9 663.40 -54.8 -52.6 -54.0 66 -99 SPO 1997 10 21 08 43 111 5.7 -9 663.40 -54.8 -52.6 -54.0 66 -99 SPO 1997 10 21 08 44 116 5.6 -9 663.40 -54.8 -52.6 -54.1 66 -99 SPO 1997 10 21 08 45 118 5.8 -9 663.40 -54.9 -52.7 -54.3 67 -99 SPO 1997 10 21 08 46 118 6.0 -9 663.50 -55.0 -52.7 -54.3 68 -99 SPO 1997 10 21 08 47 118 6.0 -9 663.50 -55.0 -52.7 -54.3 68 -99 SPO 1997 10 21 08 48 118 6.0 -9 663.50 -54.9 -52.7 -54.2 67 -99 SPO 1997 10 21 08 49 117 6.0 -9 663.50 -54.9 -52.6 -54.2 67 -99 SPO 1997 10 21 08 50 116 6.0 -9 663.50 -54.8 -52.6 -54.2 66 -99 SPO 1997 10 21 08 51 118 5.9 -9 663.50 -54.7 -52.6 -54.2 66 -99 SPO 1997 10 21 08 52 119 5.9 -9 663.50 -54.8 -52.5 -54.2 66 -99 SPO 1997 10 21 08 53 119 5.5 -9 663.50 -54.9 -52.6 -54.2 67 -99 SPO 1997 10 21 08 54 122 4.6 -9 663.50 -55.2 -52.6 -54.4 70 -99 SPO 1997 10 21 08 55 114 5.6 -9 663.50 -55.3 -52.6 -54.6 69 -99 SPO 1997 10 21 08 56 110 5.8 -9 663.50 -55.1 -52.5 -54.3 66 -99 SPO 1997 10 21 08 57 110 5.8 -9 663.50 -55.0 -52.4 -54.2 66 -99 SPO 1997 10 21 08 58 114 5.3 -9 663.50 -55.0 -52.4 -54.2 66 -99 SPO 1997 10 21 08 59 117 5.4 -9 663.50 -55.3 -52.6 -54.4 68 -99 SPO 1997 10 21 09 00 114 5.4 -9 663.50 -55.5 -52.6 -54.7 68 0 SPO 1997 10 21 09 01 108 5.6 -9 663.40 -55.7 -52.6 -54.7 70 -99 SPO 1997 10 21 09 02 103 5.9 -9 663.40 -55.8 -52.6 -54.6 69 -99 SPO 1997 10 21 09 03 103 5.9 -9 663.40 -55.7 -52.5 -54.4 67 -99 SPO 1997 10 21 09 04 104 6.0 -9 663.40 -55.6 -52.5 -54.3 66 -99 SPO 1997 10 21 09 05 105 6.0 -9 663.40 -55.5 -52.5 -54.4 65 -99 SPO 1997 10 21 09 06 104 6.1 -9 663.40 -55.4 -52.5 -54.3 65 -99 SPO 1997 10 21 09 07 101 6.2 -9 663.30 -55.3 -52.5 -54.2 64 -99 SPO 1997 10 21 09 08 98 6.2 -9 663.30 -55.2 -52.4 -54.0 64 -99 SPO 1997 10 21 09 09 99 6.2 -9 663.30 -55.2 -52.3 -53.9 64 -99 SPO 1997 10 21 09 10 102 6.1 -9 663.40 -55.1 -52.3 -54.0 63 -99 SPO 1997 10 21 09 11 103 6.2 -9 663.40 -55.2 -52.4 -54.1 66 -99 SPO 1997 10 21 09 12 102 6.2 -9 663.40 -55.1 -52.4 -54.1 66 -99 SPO 1997 10 21 09 13 101 6.1 -9 663.40 -55.2 -52.5 -54.1 67 -99 SPO 1997 10 21 09 14 100 6.2 -9 663.40 -55.2 -52.5 -54.0 68 -99 SPO 1997 10 21 09 15 98 6.3 -9 663.30 -55.1 -52.4 -53.9 67 -99 SPO 1997 10 21 09 16 98 6.2 -9 663.30 -55.0 -52.4 -53.8 66 -99 SPO 1997 10 21 09 17 99 6.1 -9 663.40 -55.0 -52.4 -53.8 68 -99 SPO 1997 10 21 09 18 101 6.0 -9 663.40 -54.9 -52.4 -53.8 67 -99 SPO 1997 10 21 09 19 104 6.0 -9 663.40 -54.9 -52.4 -53.8 67 -99 SPO 1997 10 21 09 20 106 6.1 -9 663.40 -54.9 -52.5 -54.0 67 -99 SPO 1997 10 21 09 21 106 6.2 -9 663.40 -55.0 -52.5 -54.2 66 -99 SPO 1997 10 21 09 22 104 6.3 -9 663.40 -54.9 -52.4 -54.0 65 -99 SPO 1997 10 21 09 23 105 6.2 -9 663.40 -54.8 -52.4 -53.8 64 -99 SPO 1997 10 21 09 24 107 6.2 -9 663.40 -54.8 -52.5 -53.8 66 -99 SPO 1997 10 21 09 25 110 5.6 -9 663.50 -54.9 -52.6 -54.1 67 -99 SPO 1997 10 21 09 26 111 4.8 -9 663.40 -55.4 -52.7 -54.6 71 -99 SPO 1997 10 21 09 27 104 5.6 -9 663.40 -55.6 -52.7 -54.6 70 -99 SPO 1997 10 21 09 28 106 5.6 -9 663.40 -55.4 -52.7 -54.3 69 -99 SPO 1997 10 21 09 29 110 5.4 -9 663.50 -55.6 -52.8 -54.6 69 -99 SPO 1997 10 21 09 30 113 5.3 -9 663.50 -55.8 -52.9 -54.9 69 -99 SPO 1997 10 21 09 31 110 5.1 -9 663.40 -55.6 -52.9 -54.7 66 -99 SPO 1997 10 21 09 32 104 5.1 -9 663.40 -55.6 -52.8 -54.4 65 -99 SPO 1997 10 21 09 33 102 5.2 -9 663.40 -55.5 -52.7 -54.2 65 -99 SPO 1997 10 21 09 34 103 5.2 -9 663.40 -55.6 -52.7 -54.2 66 -99 SPO 1997 10 21 09 35 102 5.3 -9 663.40 -55.6 -52.7 -54.2 66 -99 SPO 1997 10 21 09 36 101 5.1 -9 663.40 -55.6 -52.8 -54.0 66 -99 SPO 1997 10 21 09 37 100 5.0 -9 663.40 -55.5 -52.8 -54.0 66 -99 SPO 1997 10 21 09 38 100 4.9 -9 663.40 -55.4 -52.8 -54.0 65 -99 SPO 1997 10 21 09 39 100 4.9 -9 663.40 -55.3 -52.9 -53.9 65 -99 SPO 1997 10 21 09 40 97 4.7 -9 663.40 -55.4 -52.9 -53.9 65 -99 SPO 1997 10 21 09 41 96 5.0 -9 663.40 -55.3 -52.9 -53.8 66 -99 SPO 1997 10 21 09 42 94 5.4 -9 663.40 -55.0 -52.9 -53.7 64 -99 SPO 1997 10 21 09 43 94 5.4 -9 663.40 -54.9 -52.9 -53.6 65 -99 SPO 1997 10 21 09 44 96 5.5 -9 663.40 -54.9 -52.9 -53.6 66 -99 SPO 1997 10 21 09 45 97 5.5 -9 663.40 -54.9 -52.9 -53.7 67 -99 SPO 1997 10 21 09 46 96 5.2 -9 663.40 -55.0 -53.0 -53.7 66 -99 SPO 1997 10 21 09 47 95 5.2 -9 663.40 -55.1 -53.1 -53.7 67 -99 SPO 1997 10 21 09 48 96 5.0 -9 663.40 -55.1 -53.2 -53.7 67 -99 SPO 1997 10 21 09 49 98 4.9 -9 663.40 -55.1 -53.2 -53.7 67 -99 SPO 1997 10 21 09 50 101 4.6 -9 663.40 -55.2 -53.4 -53.8 68 -99 SPO 1997 10 21 09 51 101 4.7 -9 663.40 -55.4 -53.4 -54.0 69 -99 SPO 1997 10 21 09 52 101 4.7 -9 663.50 -55.5 -53.5 -54.0 70 -99 SPO 1997 10 21 09 53 102 4.7 -9 663.50 -55.6 -53.5 -54.2 70 -99 SPO 1997 10 21 09 54 102 4.8 -9 663.50 -55.6 -53.5 -54.2 69 -99 SPO 1997 10 21 09 55 103 5.0 -9 663.50 -55.6 -53.5 -54.3 67 -99 SPO 1997 10 21 09 56 101 5.0 -9 663.50 -55.6 -53.5 -54.2 67 -99 SPO 1997 10 21 09 57 98 5.0 -9 663.50 -55.6 -53.5 -54.2 66 -99 SPO 1997 10 21 09 58 97 4.9 -9 663.50 -55.7 -53.6 -54.1 67 -99 SPO 1997 10 21 09 59 101 4.8 -9 663.50 -55.7 -53.5 -54.1 67 -99 SPO 1997 10 21 10 00 104 4.8 -9 663.50 -55.6 -53.6 -54.2 65 0 SPO 1997 10 21 10 01 102 4.6 -9 663.50 -55.7 -53.7 -54.2 65 -99 SPO 1997 10 21 10 02 98 4.4 -9 663.50 -55.7 -53.7 -54.2 65 -99 SPO 1997 10 21 10 03 99 4.5 -9 663.50 -55.7 -53.6 -54.1 65 -99 SPO 1997 10 21 10 04 103 4.5 -9 663.50 -55.8 -53.6 -54.2 65 -99 SPO 1997 10 21 10 05 105 4.4 -9 663.50 -55.9 -53.7 -54.4 65 -99 SPO 1997 10 21 10 06 103 4.5 -9 663.50 -55.9 -53.7 -54.5 65 -99 SPO 1997 10 21 10 07 98 4.6 -9 663.50 -56.0 -53.8 -54.4 68 -99 SPO 1997 10 21 10 08 95 4.7 -9 663.50 -56.1 -53.8 -54.3 69 -99 SPO 1997 10 21 10 09 95 4.7 -9 663.50 -56.1 -53.8 -54.4 69 -99 SPO 1997 10 21 10 10 97 4.6 -9 663.50 -56.1 -53.8 -54.4 69 -99 SPO 1997 10 21 10 11 99 4.6 -9 663.50 -56.2 -53.8 -54.6 68 -99 SPO 1997 10 21 10 12 103 4.6 -9 663.50 -56.2 -53.7 -55.0 67 -99 SPO 1997 10 21 10 13 104 4.9 -9 663.50 -56.4 -53.7 -55.3 69 -99 SPO 1997 10 21 10 14 103 4.8 -9 663.50 -56.4 -53.7 -55.5 67 -99 SPO 1997 10 21 10 15 101 4.7 -9 663.50 -56.5 -53.8 -55.5 66 -99 SPO 1997 10 21 10 16 100 4.9 -9 663.50 -56.6 -53.8 -55.5 67 -99 SPO 1997 10 21 10 17 100 5.2 -9 663.50 -56.7 -53.8 -55.6 68 -99 SPO 1997 10 21 10 18 99 5.3 -9 663.40 -56.7 -53.7 -55.6 67 -99 SPO 1997 10 21 10 19 99 5.3 -9 663.50 -56.7 -53.7 -55.6 67 -99 SPO 1997 10 21 10 20 100 5.3 -9 663.50 -56.7 -53.7 -55.6 67 -99 SPO 1997 10 21 10 21 99 5.3 -9 663.50 -56.8 -53.7 -55.6 68 -99 SPO 1997 10 21 10 22 98 5.6 -9 663.40 -56.6 -53.7 -55.4 64 -99 SPO 1997 10 21 10 23 97 5.8 -9 663.40 -56.4 -53.6 -55.2 63 -99 SPO 1997 10 21 10 24 98 5.6 -9 663.40 -56.4 -53.7 -55.1 64 -99 SPO 1997 10 21 10 25 102 5.4 -9 663.50 -56.4 -53.8 -55.3 64 -99 SPO 1997 10 21 10 26 106 5.0 -9 663.50 -56.6 -54.0 -55.7 66 -99 SPO 1997 10 21 10 27 105 5.3 -9 663.50 -56.8 -54.1 -56.0 68 -99 SPO 1997 10 21 10 28 103 5.3 -9 663.50 -56.6 -54.1 -55.8 66 -99 SPO 1997 10 21 10 29 102 5.4 -9 663.50 -56.6 -54.0 -55.6 67 -99 SPO 1997 10 21 10 30 101 5.4 -9 663.50 -56.5 -53.8 -55.5 65 -99 SPO 1997 10 21 10 31 100 5.3 -9 663.50 -56.5 -53.8 -55.4 65 -99 SPO 1997 10 21 10 32 99 5.4 -9 663.40 -56.4 -53.7 -55.3 64 -99 SPO 1997 10 21 10 33 100 5.5 -9 663.40 -56.3 -53.7 -55.2 66 -99 SPO 1997 10 21 10 34 101 5.5 -9 663.40 -56.4 -53.6 -55.3 67 -99 SPO 1997 10 21 10 35 101 5.3 -9 663.40 -56.4 -53.6 -55.5 69 -99 SPO 1997 10 21 10 36 102 5.3 -9 663.40 -56.6 -53.7 -55.7 68 -99 SPO 1997 10 21 10 37 101 5.2 -9 663.40 -56.6 -53.7 -55.8 67 -99 SPO 1997 10 21 10 38 100 5.2 -9 663.40 -56.6 -53.7 -55.6 67 -99 SPO 1997 10 21 10 39 100 5.3 -9 663.40 -56.6 -53.7 -55.6 66 -99 SPO 1997 10 21 10 40 101 5.4 -9 663.40 -56.6 -53.7 -55.6 66 -99 SPO 1997 10 21 10 41 101 5.3 -9 663.40 -56.6 -53.7 -55.7 66 -99 SPO 1997 10 21 10 42 101 5.7 -9 663.40 -56.6 -53.8 -55.7 66 -99 SPO 1997 10 21 10 43 101 5.7 -9 663.40 -56.6 -53.8 -55.7 66 -99 SPO 1997 10 21 10 44 101 5.8 -9 663.40 -56.5 -53.9 -55.6 65 -99 SPO 1997 10 21 10 45 101 5.9 -9 663.40 -56.5 -53.8 -55.5 65 -99 SPO 1997 10 21 10 46 98 6.0 -9 663.40 -56.4 -53.8 -55.4 64 -99 SPO 1997 10 21 10 47 97 6.4 -9 663.40 -56.3 -53.8 -55.2 64 -99 SPO 1997 10 21 10 48 94 6.4 -9 663.40 -56.2 -53.6 -55.2 65 -99 SPO 1997 10 21 10 49 92 6.4 -9 663.40 -56.2 -53.6 -55.1 65 -99 SPO 1997 10 21 10 50 93 6.5 -9 663.40 -56.2 -53.5 -55.1 65 -99 SPO 1997 10 21 10 51 95 6.5 -9 663.40 -56.1 -53.5 -55.1 64 -99 SPO 1997 10 21 10 52 95 6.5 -9 663.40 -56.1 -53.6 -55.1 66 -99 SPO 1997 10 21 10 53 94 6.6 -9 663.40 -56.0 -53.6 -55.0 68 -99 SPO 1997 10 21 10 54 93 6.7 -9 663.40 -55.8 -53.5 -55.0 66 -99 SPO 1997 10 21 10 55 92 6.6 -9 663.40 -55.8 -53.5 -54.9 66 -99 SPO 1997 10 21 10 56 92 6.6 -9 663.30 -55.6 -53.5 -54.8 66 -99 SPO 1997 10 21 10 57 94 6.5 -9 663.40 -55.6 -53.6 -54.8 66 -99 SPO 1997 10 21 10 58 96 6.5 -9 663.40 -55.6 -53.6 -54.8 66 -99 SPO 1997 10 21 10 59 97 6.4 -9 663.40 -55.6 -53.7 -54.8 66 -99 SPO 1997 10 21 11 00 98 6.3 -9 663.40 -55.7 -53.7 -54.8 67 0 SPO 1997 10 21 11 01 99 6.3 -9 663.40 -55.6 -53.8 -54.8 66 -99 SPO 1997 10 21 11 02 100 6.3 -9 663.40 -55.7 -53.9 -54.8 67 -99 SPO 1997 10 21 11 03 100 6.4 -9 663.40 -55.7 -53.9 -54.9 67 -99 SPO 1997 10 21 11 04 100 6.4 -9 663.40 -55.7 -53.9 -54.9 65 -99 SPO 1997 10 21 11 05 100 6.4 -9 663.40 -55.7 -53.9 -54.9 65 -99 SPO 1997 10 21 11 06 100 6.4 -9 663.40 -55.7 -53.9 -54.9 65 -99 SPO 1997 10 21 11 07 99 6.3 -9 663.40 -55.8 -53.9 -54.9 68 -99 SPO 1997 10 21 11 08 98 6.2 -9 663.40 -55.8 -54.0 -54.9 68 -99 SPO 1997 10 21 11 09 97 6.2 -9 663.40 -55.9 -54.0 -54.9 69 -99 SPO 1997 10 21 11 10 96 6.2 -9 663.40 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 21 11 11 96 6.2 -9 663.50 -55.9 -54.0 -54.9 67 -99 SPO 1997 10 21 11 12 96 6.2 -9 663.50 -56.0 -54.0 -55.0 69 -99 SPO 1997 10 21 11 13 95 6.3 -9 663.50 -56.0 -54.0 -55.0 69 -99 SPO 1997 10 21 11 14 94 6.3 -9 663.40 -56.0 -54.0 -55.0 68 -99 SPO 1997 10 21 11 15 92 6.2 -9 663.40 -55.9 -54.0 -55.0 67 -99 SPO 1997 10 21 11 16 90 6.3 -9 663.40 -55.8 -53.9 -54.9 66 -99 SPO 1997 10 21 11 17 89 6.3 -9 663.40 -55.7 -53.9 -54.8 63 -99 SPO 1997 10 21 11 18 87 6.4 -9 663.40 -55.6 -53.9 -54.8 65 -99 SPO 1997 10 21 11 19 86 6.4 -9 663.40 -55.5 -53.9 -54.7 64 -99 SPO 1997 10 21 11 20 87 6.4 -9 663.40 -55.4 -53.9 -54.6 63 -99 SPO 1997 10 21 11 21 87 6.4 -9 663.40 -55.4 -53.9 -54.6 65 -99 SPO 1997 10 21 11 22 87 6.3 -9 663.40 -55.4 -53.9 -54.6 65 -99 SPO 1997 10 21 11 23 87 6.4 -9 663.40 -55.4 -53.9 -54.6 67 -99 SPO 1997 10 21 11 24 88 6.3 -9 663.40 -55.5 -53.9 -54.6 68 -99 SPO 1997 10 21 11 25 90 6.1 -9 663.40 -55.4 -53.9 -54.6 67 -99 SPO 1997 10 21 11 26 91 6.1 -9 663.40 -55.5 -53.9 -54.7 68 -99 SPO 1997 10 21 11 27 93 5.9 -9 663.40 -55.5 -53.9 -54.7 68 -99 SPO 1997 10 21 11 28 94 6.0 -9 663.40 -55.5 -53.9 -54.7 68 -99 SPO 1997 10 21 11 29 94 6.1 -9 663.40 -55.6 -54.0 -54.7 67 -99 SPO 1997 10 21 11 30 93 6.0 -9 663.40 -55.6 -54.0 -54.7 66 -99 SPO 1997 10 21 11 31 91 6.1 -9 663.40 -55.6 -53.9 -54.7 66 -99 SPO 1997 10 21 11 32 88 6.2 -9 663.40 -55.6 -53.9 -54.8 66 -99 SPO 1997 10 21 11 33 87 6.4 -9 663.40 -55.6 -53.9 -54.8 66 -99 SPO 1997 10 21 11 34 86 6.3 -9 663.40 -55.6 -53.8 -54.8 66 -99 SPO 1997 10 21 11 35 87 6.3 -9 663.40 -55.6 -53.9 -54.8 66 -99 SPO 1997 10 21 11 36 89 6.2 -9 663.40 -55.6 -53.9 -54.8 66 -99 SPO 1997 10 21 11 37 90 6.2 -9 663.40 -55.6 -53.9 -54.8 66 -99 SPO 1997 10 21 11 38 92 6.1 -9 663.40 -55.7 -54.0 -54.8 68 -99 SPO 1997 10 21 11 39 92 6.3 -9 663.40 -55.7 -54.0 -54.8 70 -99 SPO 1997 10 21 11 40 93 6.2 -9 663.40 -55.7 -54.0 -54.8 68 -99 SPO 1997 10 21 11 41 94 6.3 -9 663.40 -55.7 -54.0 -54.8 67 -99 SPO 1997 10 21 11 42 94 6.4 -9 663.40 -55.7 -54.0 -54.9 67 -99 SPO 1997 10 21 11 43 94 6.3 -9 663.40 -55.7 -54.0 -54.8 67 -99 SPO 1997 10 21 11 44 97 6.3 -9 663.40 -55.7 -54.0 -54.9 67 -99 SPO 1997 10 21 11 45 98 6.2 -9 663.40 -55.7 -54.0 -54.9 67 -99 SPO 1997 10 21 11 46 97 6.3 -9 663.40 -55.7 -54.1 -54.9 65 -99 SPO 1997 10 21 11 47 95 6.4 -9 663.40 -55.7 -54.1 -54.9 65 -99 SPO 1997 10 21 11 48 93 6.4 -9 663.40 -55.7 -54.1 -54.9 65 -99 SPO 1997 10 21 11 49 92 6.6 -9 663.30 -55.7 -54.1 -54.9 67 -99 SPO 1997 10 21 11 50 93 6.6 -9 663.30 -55.6 -54.1 -54.9 66 -99 SPO 1997 10 21 11 51 93 6.4 -9 663.30 -55.6 -54.1 -54.9 66 -99 SPO 1997 10 21 11 52 92 6.2 -9 663.30 -55.6 -54.1 -54.9 66 -99 SPO 1997 10 21 11 53 91 6.1 -9 663.40 -55.7 -54.1 -54.9 67 -99 SPO 1997 10 21 11 54 89 5.8 -9 663.40 -55.6 -54.2 -54.9 66 -99 SPO 1997 10 21 11 55 91 6.0 -9 663.40 -55.6 -54.2 -54.8 66 -99 SPO 1997 10 21 11 56 93 6.0 -9 663.40 -55.7 -54.2 -54.9 65 -99 SPO 1997 10 21 11 57 91 5.8 -9 663.40 -55.7 -54.3 -54.9 65 -99 SPO 1997 10 21 11 58 92 5.7 -9 663.40 -55.7 -54.3 -54.8 65 -99 SPO 1997 10 21 11 59 92 5.6 -9 663.40 -55.7 -54.3 -54.9 67 -99 SPO 1997 10 21 12 00 92 5.2 -9 663.40 -55.7 -54.3 -54.9 67 0 SPO 1997 10 21 12 01 93 5.3 -9 663.40 -55.7 -54.3 -54.9 67 -99 SPO 1997 10 21 12 02 93 5.3 -9 663.40 -55.8 -54.3 -54.9 68 -99 SPO 1997 10 21 12 03 93 5.3 -9 663.40 -55.8 -54.3 -54.9 68 -99 SPO 1997 10 21 12 04 92 5.1 -9 663.40 -55.9 -54.3 -54.9 69 -99 SPO 1997 10 21 12 05 93 5.0 -9 663.40 -55.9 -54.3 -54.9 69 -99 SPO 1997 10 21 12 06 92 5.0 -9 663.40 -55.9 -54.3 -54.9 69 -99 SPO 1997 10 21 12 07 94 4.9 -9 663.40 -55.9 -54.3 -54.9 67 -99 SPO 1997 10 21 12 08 96 4.9 -9 663.40 -56.0 -54.3 -55.0 65 -99 SPO 1997 10 21 12 09 99 4.8 -9 663.40 -56.0 -54.4 -55.0 65 -99 SPO 1997 10 21 12 10 99 4.8 -9 663.50 -56.0 -54.4 -55.0 65 -99 SPO 1997 10 21 12 11 99 4.8 -9 663.50 -56.0 -54.4 -55.0 68 -99 SPO 1997 10 21 12 12 98 5.2 -9 663.40 -56.0 -54.4 -55.0 68 -99 SPO 1997 10 21 12 13 95 5.2 -9 663.40 -56.0 -54.3 -55.0 68 -99 SPO 1997 10 21 12 14 91 5.2 -9 663.40 -56.0 -54.3 -55.0 66 -99 SPO 1997 10 21 12 15 91 5.2 -9 663.40 -56.0 -54.4 -55.0 65 -99 SPO 1997 10 21 12 16 91 5.2 -9 663.40 -56.0 -54.4 -55.0 65 -99 SPO 1997 10 21 12 17 90 5.0 -9 663.40 -56.0 -54.4 -55.1 66 -99 SPO 1997 10 21 12 18 89 4.7 -9 663.40 -56.1 -54.4 -55.1 67 -99 SPO 1997 10 21 12 19 88 4.9 -9 663.40 -56.1 -54.5 -55.1 67 -99 SPO 1997 10 21 12 20 87 4.9 -9 663.40 -56.1 -54.5 -55.1 67 -99 SPO 1997 10 21 12 21 88 5.0 -9 663.40 -56.1 -54.5 -55.1 66 -99 SPO 1997 10 21 12 22 87 5.0 -9 663.40 -56.1 -54.4 -55.1 66 -99 SPO 1997 10 21 12 23 87 5.1 -9 663.40 -56.1 -54.4 -55.2 66 -99 SPO 1997 10 21 12 24 87 5.2 -9 663.40 -56.1 -54.4 -55.2 66 -99 SPO 1997 10 21 12 25 87 5.0 -9 663.40 -56.2 -54.4 -55.2 69 -99 SPO 1997 10 21 12 26 88 5.0 -9 663.40 -56.2 -54.4 -55.2 69 -99 SPO 1997 10 21 12 27 89 5.2 -9 663.40 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 28 89 5.3 -9 663.40 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 29 89 5.0 -9 663.40 -56.3 -54.3 -55.3 68 -99 SPO 1997 10 21 12 30 90 5.0 -9 663.40 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 31 90 5.0 -9 663.40 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 32 91 5.2 -9 663.40 -56.3 -54.3 -55.4 66 -99 SPO 1997 10 21 12 33 93 5.1 -9 663.40 -56.3 -54.3 -55.3 66 -99 SPO 1997 10 21 12 34 96 5.1 -9 663.40 -56.3 -54.4 -55.3 66 -99 SPO 1997 10 21 12 35 95 5.0 -9 663.50 -56.3 -54.4 -55.4 66 -99 SPO 1997 10 21 12 36 92 4.7 -9 663.50 -56.3 -54.5 -55.4 66 -99 SPO 1997 10 21 12 37 90 4.6 -9 663.50 -56.4 -54.5 -55.4 67 -99 SPO 1997 10 21 12 38 90 4.8 -9 663.50 -56.4 -54.5 -55.4 69 -99 SPO 1997 10 21 12 39 89 4.8 -9 663.40 -56.3 -54.4 -55.4 68 -99 SPO 1997 10 21 12 40 88 4.9 -9 663.40 -56.4 -54.4 -55.4 69 -99 SPO 1997 10 21 12 41 88 4.9 -9 663.40 -56.3 -54.4 -55.4 68 -99 SPO 1997 10 21 12 42 88 4.6 -9 663.40 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 43 90 4.5 -9 663.50 -56.3 -54.4 -55.3 68 -99 SPO 1997 10 21 12 44 91 4.5 -9 663.50 -56.4 -54.4 -55.3 69 -99 SPO 1997 10 21 12 45 91 4.2 -9 663.50 -56.4 -54.4 -55.3 69 -99 SPO 1997 10 21 12 46 91 3.9 -9 663.50 -56.4 -54.5 -55.2 69 -99 SPO 1997 10 21 12 47 92 3.9 -9 663.50 -56.4 -54.5 -55.2 67 -99 SPO 1997 10 21 12 48 91 4.0 -9 663.50 -56.4 -54.6 -55.2 67 -99 SPO 1997 10 21 12 49 89 4.1 -9 663.50 -56.4 -54.6 -55.2 67 -99 SPO 1997 10 21 12 50 90 4.0 -9 663.50 -56.4 -54.6 -55.2 67 -99 SPO 1997 10 21 12 51 92 3.9 -9 663.50 -56.4 -54.6 -55.2 67 -99 SPO 1997 10 21 12 52 94 3.9 -9 663.50 -56.5 -54.6 -55.2 68 -99 SPO 1997 10 21 12 53 96 3.7 -9 663.50 -56.5 -54.6 -55.2 68 -99 SPO 1997 10 21 12 54 97 3.7 -9 663.50 -56.6 -54.6 -55.2 68 -99 SPO 1997 10 21 12 55 98 3.8 -9 663.50 -56.7 -54.6 -55.2 69 -99 SPO 1997 10 21 12 56 96 3.8 -9 663.50 -56.7 -54.6 -55.2 69 -99 SPO 1997 10 21 12 57 92 4.0 -9 663.50 -56.7 -54.6 -55.2 71 -99 SPO 1997 10 21 12 58 88 4.2 -9 663.50 -56.7 -54.6 -55.3 71 -99 SPO 1997 10 21 12 59 85 4.3 -9 663.50 -56.7 -54.6 -55.5 71 -99 SPO 1997 10 21 13 00 83 4.3 -9 663.40 -56.7 -54.6 -55.6 69 0 SPO 1997 10 21 13 01 83 4.4 -9 663.50 -56.7 -54.5 -55.7 68 -99 SPO 1997 10 21 13 02 84 4.4 -9 663.50 -56.6 -54.5 -55.6 66 -99 SPO 1997 10 21 13 03 86 4.5 -9 663.50 -56.6 -54.5 -55.5 66 -99 SPO 1997 10 21 13 04 89 4.5 -9 663.50 -56.6 -54.4 -55.4 68 -99 SPO 1997 10 21 13 05 90 4.5 -9 663.50 -56.6 -54.4 -55.4 68 -99 SPO 1997 10 21 13 06 93 4.4 -9 663.40 -56.6 -54.4 -55.4 68 -99 SPO 1997 10 21 13 07 93 4.4 -9 663.40 -56.6 -54.4 -55.4 68 -99 SPO 1997 10 21 13 08 94 4.5 -9 663.40 -56.5 -54.4 -55.3 68 -99 SPO 1997 10 21 13 09 96 4.7 -9 663.40 -56.5 -54.4 -55.3 68 -99 SPO 1997 10 21 13 10 96 4.8 -9 663.40 -56.5 -54.3 -55.4 69 -99 SPO 1997 10 21 13 11 97 4.9 -9 663.40 -56.5 -54.4 -55.4 69 -99 SPO 1997 10 21 13 12 99 5.1 -9 663.40 -56.4 -54.4 -55.4 69 -99 SPO 1997 10 21 13 13 99 5.1 -9 663.40 -56.3 -54.3 -55.4 66 -99 SPO 1997 10 21 13 14 98 5.2 -9 663.40 -56.3 -54.2 -55.4 66 -99 SPO 1997 10 21 13 15 92 5.5 -9 663.40 -56.2 -54.2 -55.4 64 -99 SPO 1997 10 21 13 16 90 5.4 -9 663.30 -56.2 -54.2 -55.3 65 -99 SPO 1997 10 21 13 17 89 5.4 -9 663.30 -56.1 -54.2 -55.3 66 -99 SPO 1997 10 21 13 18 89 5.5 -9 663.30 -56.1 -54.2 -55.3 66 -99 SPO 1997 10 21 13 19 90 5.3 -9 663.30 -56.1 -54.2 -55.3 66 -99 SPO 1997 10 21 13 20 89 5.0 -9 663.30 -56.0 -54.2 -55.2 66 -99 SPO 1997 10 21 13 21 93 4.6 -9 663.30 -56.0 -54.3 -55.2 66 -99 SPO 1997 10 21 13 22 97 4.4 -9 663.30 -56.0 -54.3 -55.1 68 -99 SPO 1997 10 21 13 23 99 4.5 -9 663.40 -56.0 -54.4 -55.1 68 -99 SPO 1997 10 21 13 24 101 4.5 -9 663.40 -56.0 -54.4 -55.2 68 -99 SPO 1997 10 21 13 25 102 4.5 -9 663.40 -56.0 -54.4 -55.2 68 -99 SPO 1997 10 21 13 26 101 4.7 -9 663.40 -56.0 -54.4 -55.2 68 -99 SPO 1997 10 21 13 27 101 4.7 -9 663.40 -55.9 -54.4 -55.1 67 -99 SPO 1997 10 21 13 28 102 4.5 -9 663.30 -55.9 -54.5 -55.1 67 -99 SPO 1997 10 21 13 29 105 4.5 -9 663.30 -56.0 -54.6 -55.1 68 -99 SPO 1997 10 21 13 30 107 4.7 -9 663.40 -56.1 -54.6 -55.2 69 -99 SPO 1997 10 21 13 31 109 4.5 -9 663.40 -56.1 -54.6 -55.4 70 -99 SPO 1997 10 21 13 32 110 4.5 -9 663.40 -56.1 -54.7 -55.4 70 -99 SPO 1997 10 21 13 33 110 4.6 -9 663.40 -56.2 -54.7 -55.5 71 -99 SPO 1997 10 21 13 34 108 4.5 -9 663.40 -56.2 -54.7 -55.4 69 -99 SPO 1997 10 21 13 35 107 4.4 -9 663.40 -56.2 -54.8 -55.4 68 -99 SPO 1997 10 21 13 36 105 4.5 -9 663.30 -56.2 -54.8 -55.3 68 -99 SPO 1997 10 21 13 37 104 4.7 -9 663.30 -56.2 -54.9 -55.3 68 -99 SPO 1997 10 21 13 38 101 4.8 -9 663.30 -56.2 -54.9 -55.2 68 -99 SPO 1997 10 21 13 39 100 4.7 -9 663.30 -56.2 -54.9 -55.2 69 -99 SPO 1997 10 21 13 40 100 4.8 -9 663.30 -56.1 -55.0 -55.2 66 -99 SPO 1997 10 21 13 41 101 4.9 -9 663.30 -56.0 -55.0 -55.1 65 -99 SPO 1997 10 21 13 42 102 4.9 -9 663.30 -56.0 -55.0 -55.1 64 -99 SPO 1997 10 21 13 43 102 4.9 -9 663.30 -56.0 -55.0 -55.2 65 -99 SPO 1997 10 21 13 44 101 4.9 -9 663.30 -56.0 -55.0 -55.2 66 -99 SPO 1997 10 21 13 45 101 4.8 -9 663.30 -56.0 -55.0 -55.2 68 -99 SPO 1997 10 21 13 46 100 5.1 -9 663.30 -56.0 -55.1 -55.2 68 -99 SPO 1997 10 21 13 47 99 5.1 -9 663.30 -56.0 -55.1 -55.2 68 -99 SPO 1997 10 21 13 48 97 5.2 -9 663.30 -56.0 -55.0 -55.2 68 -99 SPO 1997 10 21 13 49 97 5.1 -9 663.30 -56.0 -55.0 -55.2 68 -99 SPO 1997 10 21 13 50 96 5.2 -9 663.30 -56.0 -55.0 -55.2 68 -99 SPO 1997 10 21 13 51 95 5.2 -9 663.30 -56.0 -55.0 -55.2 68 -99 SPO 1997 10 21 13 52 94 5.2 -9 663.30 -56.0 -55.1 -55.2 68 -99 SPO 1997 10 21 13 53 94 4.8 -9 663.30 -56.0 -55.1 -55.2 68 -99 SPO 1997 10 21 13 54 95 4.6 -9 663.40 -56.0 -55.1 -55.2 68 -99 SPO 1997 10 21 13 55 98 4.3 -9 663.40 -56.0 -55.2 -55.1 66 -99 SPO 1997 10 21 13 56 103 4.3 -9 663.40 -56.1 -55.2 -55.1 66 -99 SPO 1997 10 21 13 57 104 4.1 -9 663.50 -56.0 -55.3 -55.2 65 -99 SPO 1997 10 21 13 58 103 3.9 -9 663.50 -56.0 -55.3 -55.1 65 -99 SPO 1997 10 21 13 59 102 3.7 -9 663.50 -56.1 -55.4 -55.1 64 -99 SPO 1997 10 21 14 00 99 3.9 -9 663.50 -56.1 -55.4 -55.0 64 0 SPO 1997 10 21 14 01 100 3.8 -9 663.50 -56.1 -55.4 -55.0 64 -99 SPO 1997 10 21 14 02 99 3.7 -9 663.50 -56.2 -55.4 -55.0 65 -99 SPO 1997 10 21 14 03 102 3.9 -9 663.50 -56.1 -55.4 -55.0 64 -99 SPO 1997 10 21 14 04 103 3.9 -9 663.50 -56.1 -55.4 -55.0 64 -99 SPO 1997 10 21 14 05 99 3.9 -9 663.50 -56.1 -55.4 -55.1 66 -99 SPO 1997 10 21 14 06 97 4.2 -9 663.50 -56.2 -55.3 -55.1 65 -99 SPO 1997 10 21 14 07 93 4.4 -9 663.50 -56.2 -55.3 -55.1 65 -99 SPO 1997 10 21 14 08 91 4.5 -9 663.40 -56.2 -55.4 -55.1 64 -99 SPO 1997 10 21 14 09 93 4.6 -9 663.40 -56.2 -55.3 -55.2 64 -99 SPO 1997 10 21 14 10 96 4.5 -9 663.40 -56.2 -55.4 -55.2 64 -99 SPO 1997 10 21 14 11 100 4.6 -9 663.40 -56.3 -55.4 -55.2 66 -99 SPO 1997 10 21 14 12 101 4.7 -9 663.40 -56.2 -55.4 -55.2 64 -99 SPO 1997 10 21 14 13 98 4.5 -9 663.40 -56.2 -55.4 -55.2 64 -99 SPO 1997 10 21 14 14 95 4.6 -9 663.40 -56.2 -55.4 -55.3 63 -99 SPO 1997 10 21 14 15 93 4.7 -9 663.40 -56.3 -55.4 -55.2 64 -99 SPO 1997 10 21 14 16 92 4.7 -9 663.40 -56.2 -55.5 -55.3 64 -99 SPO 1997 10 21 14 17 90 4.4 -9 663.40 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 21 14 18 90 4.3 -9 663.40 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 21 14 19 89 4.4 -9 663.40 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 21 14 20 90 4.4 -9 663.40 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 21 14 21 91 4.0 -9 663.50 -56.3 -55.5 -55.3 62 -99 SPO 1997 10 21 14 22 94 4.2 -9 663.50 -56.3 -55.5 -55.2 62 -99 SPO 1997 10 21 14 23 98 4.5 -9 663.50 -56.3 -55.5 -55.3 62 -99 SPO 1997 10 21 14 24 100 4.3 -9 663.50 -56.2 -55.4 -55.3 61 -99 SPO 1997 10 21 14 25 98 4.2 -9 663.50 -56.3 -55.4 -55.3 64 -99 SPO 1997 10 21 14 26 96 4.2 -9 663.50 -56.2 -55.3 -55.2 63 -99 SPO 1997 10 21 14 27 94 4.1 -9 663.50 -56.3 -55.3 -55.2 64 -99 SPO 1997 10 21 14 28 98 4.4 -9 663.50 -56.3 -55.3 -55.3 64 -99 SPO 1997 10 21 14 29 96 4.5 -9 663.50 -56.3 -55.3 -55.3 64 -99 SPO 1997 10 21 14 30 93 4.2 -9 663.50 -56.2 -55.3 -55.2 63 -99 SPO 1997 10 21 14 31 92 4.0 -9 663.50 -56.2 -55.4 -55.2 63 -99 SPO 1997 10 21 14 32 95 3.8 -9 663.50 -56.2 -55.4 -55.1 63 -99 SPO 1997 10 21 14 33 97 4.0 -9 663.50 -56.2 -55.4 -55.1 63 -99 SPO 1997 10 21 14 34 98 4.0 -9 663.50 -56.2 -55.4 -55.1 63 -99 SPO 1997 10 21 14 35 96 4.1 -9 663.50 -56.3 -55.4 -55.2 64 -99 SPO 1997 10 21 14 36 93 4.0 -9 663.50 -56.3 -55.5 -55.2 62 -99 SPO 1997 10 21 14 37 93 4.1 -9 663.50 -56.3 -55.5 -55.2 64 -99 SPO 1997 10 21 14 38 95 4.3 -9 663.40 -56.3 -55.5 -55.2 64 -99 SPO 1997 10 21 14 39 94 4.0 -9 663.40 -56.3 -55.5 -55.2 64 -99 SPO 1997 10 21 14 40 97 4.0 -9 663.50 -56.3 -55.6 -55.2 64 -99 SPO 1997 10 21 14 41 100 3.6 -9 663.50 -56.4 -55.6 -55.2 65 -99 SPO 1997 10 21 14 42 104 3.9 -9 663.50 -56.4 -55.6 -55.2 65 -99 SPO 1997 10 21 14 43 108 3.9 -9 663.50 -56.3 -55.6 -55.4 64 -99 SPO 1997 10 21 14 44 110 4.0 -9 663.50 -56.3 -55.6 -55.5 64 -99 SPO 1997 10 21 14 45 113 3.9 -9 663.50 -56.3 -55.5 -55.6 64 -99 SPO 1997 10 21 14 46 114 4.2 -9 663.50 -56.4 -55.5 -55.7 64 -99 SPO 1997 10 21 14 47 113 3.9 -9 663.50 -56.3 -55.5 -55.6 64 -99 SPO 1997 10 21 14 48 113 4.1 -9 663.50 -56.3 -55.5 -55.6 62 -99 SPO 1997 10 21 14 49 113 4.0 -9 663.50 -56.4 -55.4 -55.6 63 -99 SPO 1997 10 21 14 50 113 4.2 -9 663.50 -56.4 -55.4 -55.6 64 -99 SPO 1997 10 21 14 51 111 4.3 -9 663.50 -56.4 -55.4 -55.6 64 -99 SPO 1997 10 21 14 52 108 4.5 -9 663.50 -56.3 -55.4 -55.5 64 -99 SPO 1997 10 21 14 53 106 4.5 -9 663.50 -56.3 -55.4 -55.4 64 -99 SPO 1997 10 21 14 54 106 4.6 -9 663.50 -56.3 -55.4 -55.4 64 -99 SPO 1997 10 21 14 55 106 4.5 -9 663.50 -56.3 -55.4 -55.4 64 -99 SPO 1997 10 21 14 56 106 4.5 -9 663.50 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 14 57 109 4.3 -9 663.50 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 14 58 110 4.6 -9 663.50 -56.2 -55.5 -55.5 63 -99 SPO 1997 10 21 14 59 110 4.2 -9 663.60 -56.2 -55.6 -55.5 61 -99 SPO 1997 10 21 15 00 108 4.4 -9 663.60 -56.3 -55.6 -55.5 62 0 SPO 1997 10 21 15 01 108 4.3 -9 663.60 -56.3 -55.6 -55.5 64 -99 SPO 1997 10 21 15 02 108 4.4 -9 663.50 -56.3 -55.6 -55.5 64 -99 SPO 1997 10 21 15 03 108 4.8 -9 663.50 -56.3 -55.6 -55.5 64 -99 SPO 1997 10 21 15 04 105 4.5 -9 663.50 -56.3 -55.5 -55.5 64 -99 SPO 1997 10 21 15 05 103 4.4 -9 663.50 -56.4 -55.6 -55.5 64 -99 SPO 1997 10 21 15 06 102 4.3 -9 663.50 -56.3 -55.6 -55.4 64 -99 SPO 1997 10 21 15 07 101 4.7 -9 663.50 -56.4 -55.6 -55.4 65 -99 SPO 1997 10 21 15 08 102 4.8 -9 663.50 -56.4 -55.6 -55.5 64 -99 SPO 1997 10 21 15 09 99 4.7 -9 663.50 -56.4 -55.6 -55.5 64 -99 SPO 1997 10 21 15 10 98 4.6 -9 663.50 -56.4 -55.6 -55.5 64 -99 SPO 1997 10 21 15 11 100 4.7 -9 663.50 -56.4 -55.6 -55.5 64 -99 SPO 1997 10 21 15 12 102 5.1 -9 663.50 -56.4 -55.6 -55.5 63 -99 SPO 1997 10 21 15 13 102 4.7 -9 663.50 -56.4 -55.6 -55.5 63 -99 SPO 1997 10 21 15 14 102 4.6 -9 663.50 -56.4 -55.7 -55.6 63 -99 SPO 1997 10 21 15 15 99 4.8 -9 663.50 -56.4 -55.7 -55.5 61 -99 SPO 1997 10 21 15 16 96 4.6 -9 663.50 -56.4 -55.7 -55.5 61 -99 SPO 1997 10 21 15 17 93 4.6 -9 663.50 -56.4 -55.6 -55.5 63 -99 SPO 1997 10 21 15 18 93 4.5 -9 663.50 -56.4 -55.6 -55.5 63 -99 SPO 1997 10 21 15 19 93 4.2 -9 663.50 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 21 15 20 94 4.2 -9 663.60 -56.4 -55.7 -55.4 64 -99 SPO 1997 10 21 15 21 95 4.1 -9 663.60 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 21 15 22 98 4.2 -9 663.60 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 21 15 23 101 4.2 -9 663.60 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 21 15 24 100 4.1 -9 663.60 -56.3 -55.6 -55.4 64 -99 SPO 1997 10 21 15 25 98 4.3 -9 663.60 -56.4 -55.6 -55.3 64 -99 SPO 1997 10 21 15 26 96 4.5 -9 663.60 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 21 15 27 95 4.8 -9 663.60 -56.2 -55.5 -55.4 63 -99 SPO 1997 10 21 15 28 95 4.9 -9 663.60 -56.2 -55.4 -55.4 63 -99 SPO 1997 10 21 15 29 95 5.0 -9 663.60 -56.3 -55.4 -55.4 64 -99 SPO 1997 10 21 15 30 97 4.6 -9 663.60 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 31 99 4.8 -9 663.60 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 32 98 4.8 -9 663.60 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 33 95 4.8 -9 663.60 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 34 96 5.0 -9 663.50 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 35 95 4.9 -9 663.50 -56.2 -55.5 -55.4 63 -99 SPO 1997 10 21 15 36 93 4.9 -9 663.50 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 37 95 4.7 -9 663.60 -56.3 -55.5 -55.4 64 -99 SPO 1997 10 21 15 38 98 4.8 -9 663.60 -56.2 -55.5 -55.4 64 -99 SPO 1997 10 21 15 39 102 5.0 -9 663.60 -56.2 -55.5 -55.4 63 -99 SPO 1997 10 21 15 40 105 5.1 -9 663.60 -56.2 -55.4 -55.5 63 -99 SPO 1997 10 21 15 41 107 5.0 -9 663.60 -56.2 -55.4 -55.6 63 -99 SPO 1997 10 21 15 42 106 5.2 -9 663.60 -56.3 -55.4 -55.6 64 -99 SPO 1997 10 21 15 43 105 5.2 -9 663.60 -56.2 -55.4 -55.6 63 -99 SPO 1997 10 21 15 44 103 5.1 -9 663.60 -56.2 -55.4 -55.6 63 -99 SPO 1997 10 21 15 45 104 5.2 -9 663.50 -56.2 -55.4 -55.5 64 -99 SPO 1997 10 21 15 46 101 5.2 -9 663.50 -56.3 -55.4 -55.5 64 -99 SPO 1997 10 21 15 47 99 5.5 -9 663.50 -56.3 -55.4 -55.5 64 -99 SPO 1997 10 21 15 48 97 5.9 -9 663.40 -56.3 -55.4 -55.5 64 -99 SPO 1997 10 21 15 49 95 5.9 -9 663.40 -56.2 -55.4 -55.5 64 -99 SPO 1997 10 21 15 50 95 6.1 -9 663.40 -56.2 -55.4 -55.5 65 -99 SPO 1997 10 21 15 51 95 6.1 -9 663.40 -56.2 -55.4 -55.6 64 -99 SPO 1997 10 21 15 52 96 6.5 -9 663.40 -56.2 -55.3 -55.6 64 -99 SPO 1997 10 21 15 53 96 6.8 -9 663.30 -56.2 -55.3 -55.5 65 -99 SPO 1997 10 21 15 54 97 6.3 -9 663.40 -56.1 -55.3 -55.6 67 -99 SPO 1997 10 21 15 55 99 6.4 -9 663.40 -56.2 -55.3 -55.6 69 -99 SPO 1997 10 21 15 56 101 6.0 -9 663.40 -56.1 -55.3 -55.6 67 -99 SPO 1997 10 21 15 57 103 6.1 -9 663.40 -56.2 -55.4 -55.6 68 -99 SPO 1997 10 21 15 58 102 6.1 -9 663.40 -56.2 -55.3 -55.6 68 -99 SPO 1997 10 21 15 59 101 6.4 -9 663.40 -56.2 -55.3 -55.6 67 -99 SPO 1997 10 21 16 00 102 6.4 -9 663.40 -56.1 -55.3 -55.6 66 0 SPO 1997 10 21 16 01 104 6.4 -9 663.40 -56.1 -55.3 -55.6 66 -99 SPO 1997 10 21 16 02 105 6.3 -9 663.40 -56.1 -55.3 -55.6 66 -99 SPO 1997 10 21 16 03 104 6.4 -9 663.40 -56.1 -55.3 -55.6 64 -99 SPO 1997 10 21 16 04 103 6.4 -9 663.40 -56.2 -55.3 -55.6 64 -99 SPO 1997 10 21 16 05 101 6.7 -9 663.40 -56.2 -55.4 -55.6 64 -99 SPO 1997 10 21 16 06 99 6.5 -9 663.30 -56.2 -55.4 -55.6 65 -99 SPO 1997 10 21 16 07 99 6.5 -9 663.30 -56.2 -55.4 -55.6 65 -99 SPO 1997 10 21 16 08 99 6.7 -9 663.30 -56.1 -55.4 -55.6 64 -99 SPO 1997 10 21 16 09 102 6.5 -9 663.30 -56.1 -55.3 -55.6 64 -99 SPO 1997 10 21 16 10 104 6.5 -9 663.30 -56.1 -55.4 -55.6 64 -99 SPO 1997 10 21 16 11 107 6.7 -9 663.40 -56.1 -55.4 -55.7 64 -99 SPO 1997 10 21 16 12 106 6.9 -9 663.40 -56.1 -55.4 -55.7 64 -99 SPO 1997 10 21 16 13 104 6.9 -9 663.40 -56.1 -55.4 -55.7 64 -99 SPO 1997 10 21 16 14 101 6.6 -9 663.30 -56.2 -55.4 -55.7 -99 -99 SPO 1997 10 21 16 15 102 6.6 -9 663.30 -56.1 -55.4 -55.7 -99 -99 SPO 1997 10 21 16 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 21 16 17 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 21 16 18 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 21 16 19 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 21 16 20 107 6.5 -9 663.40 -56.2 -55.5 -55.8 -99 -99 SPO 1997 10 21 16 21 104 6.5 -9 663.40 -56.2 -55.5 -55.8 -99 -99 SPO 1997 10 21 16 22 101 6.5 -9 663.40 -56.2 -55.5 -55.7 63 -99 SPO 1997 10 21 16 23 100 6.5 -9 663.40 -56.2 -55.5 -55.7 63 -99 SPO 1997 10 21 16 24 103 6.4 -9 663.40 -56.2 -55.6 -55.7 63 -99 SPO 1997 10 21 16 25 106 6.1 -9 663.40 -56.2 -55.6 -55.8 63 -99 SPO 1997 10 21 16 26 108 6.2 -9 663.40 -56.3 -55.6 -55.8 64 -99 SPO 1997 10 21 16 27 106 6.3 -9 663.50 -56.2 -55.7 -55.8 63 -99 SPO 1997 10 21 16 28 105 6.1 -9 663.40 -56.2 -55.7 -55.8 63 -99 SPO 1997 10 21 16 29 102 6.5 -9 663.40 -56.3 -55.7 -55.8 62 -99 SPO 1997 10 21 16 30 100 6.5 -9 663.40 -56.3 -55.6 -55.8 62 -99 SPO 1997 10 21 16 31 101 6.4 -9 663.40 -56.3 -55.6 -55.8 62 -99 SPO 1997 10 21 16 32 103 5.9 -9 663.50 -56.3 -55.6 -55.8 62 -99 SPO 1997 10 21 16 33 108 5.8 -9 663.50 -56.3 -55.6 -55.8 62 -99 SPO 1997 10 21 16 34 112 5.5 -9 663.50 -56.4 -55.7 -55.9 63 -99 SPO 1997 10 21 16 35 113 5.2 -9 663.50 -56.4 -55.7 -56.0 63 -99 SPO 1997 10 21 16 36 110 5.1 -9 663.50 -56.4 -55.8 -56.0 63 -99 SPO 1997 10 21 16 37 106 5.2 -9 663.50 -56.4 -55.8 -56.0 61 -99 SPO 1997 10 21 16 38 101 5.5 -9 663.40 -56.5 -55.7 -55.9 61 -99 SPO 1997 10 21 16 39 101 5.5 -9 663.40 -56.5 -55.7 -55.8 61 -99 SPO 1997 10 21 16 40 103 5.8 -9 663.40 -56.4 -55.8 -55.8 61 -99 SPO 1997 10 21 16 41 108 5.6 -9 663.50 -56.4 -55.8 -55.8 61 -99 SPO 1997 10 21 16 42 113 5.9 -9 663.50 -56.3 -55.8 -55.9 60 -99 SPO 1997 10 21 16 43 112 5.6 -9 663.50 -56.3 -55.8 -56.0 60 -99 SPO 1997 10 21 16 44 107 5.9 -9 663.50 -56.3 -55.8 -55.9 60 -99 SPO 1997 10 21 16 45 101 6.0 -9 663.40 -56.3 -55.7 -55.8 60 -99 SPO 1997 10 21 16 46 99 6.1 -9 663.40 -56.3 -55.7 -55.7 62 -99 SPO 1997 10 21 16 47 100 6.0 -9 663.40 -56.3 -55.6 -55.7 62 -99 SPO 1997 10 21 16 48 105 6.2 -9 663.40 -56.3 -55.6 -55.8 62 -99 SPO 1997 10 21 16 49 108 5.8 -9 663.40 -56.3 -55.6 -55.8 64 -99 SPO 1997 10 21 16 50 105 6.1 -9 663.40 -56.3 -55.6 -55.8 64 -99 SPO 1997 10 21 16 51 102 5.9 -9 663.40 -56.4 -55.6 -55.8 64 -99 SPO 1997 10 21 16 52 98 6.0 -9 663.30 -56.4 -55.6 -55.8 63 -99 SPO 1997 10 21 16 53 98 6.2 -9 663.30 -56.4 -55.6 -55.8 64 -99 SPO 1997 10 21 16 54 101 5.8 -9 663.40 -56.4 -55.6 -55.8 63 -99 SPO 1997 10 21 16 55 105 5.9 -9 663.40 -56.4 -55.7 -55.8 63 -99 SPO 1997 10 21 16 56 105 5.8 -9 663.40 -56.4 -55.8 -55.9 61 -99 SPO 1997 10 21 16 57 104 5.8 -9 663.40 -56.4 -55.8 -55.9 61 -99 SPO 1997 10 21 16 58 101 5.8 -9 663.40 -56.4 -55.8 -55.8 63 -99 SPO 1997 10 21 16 59 100 5.5 -9 663.40 -56.4 -55.8 -55.8 63 -99 SPO 1997 10 21 17 00 101 5.7 -9 663.40 -56.4 -55.8 -55.8 63 0 SPO 1997 10 21 17 01 102 5.3 -9 663.40 -56.5 -55.9 -55.8 64 -99 SPO 1997 10 21 17 02 102 5.1 -9 663.40 -56.5 -55.9 -55.8 64 -99 SPO 1997 10 21 17 03 102 5.2 -9 663.40 -56.5 -55.9 -55.8 64 -99 SPO 1997 10 21 17 04 100 5.2 -9 663.40 -56.6 -56.0 -55.8 63 -99 SPO 1997 10 21 17 05 100 5.1 -9 663.40 -56.6 -56.0 -55.9 63 -99 SPO 1997 10 21 17 06 100 5.4 -9 663.40 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 17 07 98 5.2 -9 663.40 -56.6 -55.9 -55.8 62 -99 SPO 1997 10 21 17 08 97 5.1 -9 663.50 -56.5 -56.0 -55.8 61 -99 SPO 1997 10 21 17 09 99 5.4 -9 663.50 -56.5 -55.9 -55.8 61 -99 SPO 1997 10 21 17 10 99 5.2 -9 663.50 -56.5 -55.9 -55.8 61 -99 SPO 1997 10 21 17 11 101 5.2 -9 663.50 -56.6 -55.9 -55.9 62 -99 SPO 1997 10 21 17 12 104 4.9 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 17 13 102 4.7 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 17 14 100 4.7 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 17 15 101 5.1 -9 663.50 -56.6 -56.1 -55.8 62 -99 SPO 1997 10 21 17 16 101 5.0 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 17 17 103 5.0 -9 663.50 -56.7 -56.0 -55.9 63 -99 SPO 1997 10 21 17 18 103 5.0 -9 663.50 -56.7 -56.0 -55.9 63 -99 SPO 1997 10 21 17 19 102 5.0 -9 663.50 -56.7 -56.0 -55.9 63 -99 SPO 1997 10 21 17 20 102 5.3 -9 663.50 -56.7 -56.0 -56.0 63 -99 SPO 1997 10 21 17 21 102 5.2 -9 663.50 -56.7 -56.0 -55.9 63 -99 SPO 1997 10 21 17 22 98 5.0 -9 663.50 -56.7 -55.9 -55.9 64 -99 SPO 1997 10 21 17 23 97 4.7 -9 663.50 -56.7 -56.0 -55.9 64 -99 SPO 1997 10 21 17 24 99 4.8 -9 663.50 -56.7 -56.0 -55.9 63 -99 SPO 1997 10 21 17 25 100 4.8 -9 663.50 -56.7 -55.9 -55.9 63 -99 SPO 1997 10 21 17 26 99 5.2 -9 663.50 -56.7 -55.9 -55.9 63 -99 SPO 1997 10 21 17 27 96 5.3 -9 663.50 -56.6 -55.9 -55.8 62 -99 SPO 1997 10 21 17 28 92 5.3 -9 663.50 -56.6 -55.8 -55.8 62 -99 SPO 1997 10 21 17 29 89 5.4 -9 663.50 -56.6 -55.9 -55.8 64 -99 SPO 1997 10 21 17 30 88 5.7 -9 663.40 -56.5 -55.9 -55.8 62 -99 SPO 1997 10 21 17 31 90 5.7 -9 663.50 -56.5 -55.8 -55.8 62 -99 SPO 1997 10 21 17 32 92 5.5 -9 663.50 -56.5 -55.9 -55.8 64 -99 SPO 1997 10 21 17 33 94 5.5 -9 663.50 -56.5 -55.8 -55.8 64 -99 SPO 1997 10 21 17 34 96 5.4 -9 663.50 -56.4 -55.9 -55.8 64 -99 SPO 1997 10 21 17 35 94 6.0 -9 663.50 -56.4 -55.8 -55.8 64 -99 SPO 1997 10 21 17 36 94 6.0 -9 663.50 -56.4 -55.8 -55.8 65 -99 SPO 1997 10 21 17 37 94 6.2 -9 663.40 -56.4 -55.7 -55.8 65 -99 SPO 1997 10 21 17 38 93 6.0 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 39 93 5.8 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 40 94 6.0 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 41 96 5.8 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 42 99 5.9 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 43 99 5.9 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 44 99 5.9 -9 663.50 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 45 98 5.9 -9 663.40 -56.4 -55.8 -55.8 63 -99 SPO 1997 10 21 17 46 97 6.0 -9 663.40 -56.4 -55.8 -55.8 63 -99 SPO 1997 10 21 17 47 96 6.1 -9 663.40 -56.4 -55.8 -55.8 64 -99 SPO 1997 10 21 17 48 96 6.0 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 49 99 6.3 -9 663.40 -56.5 -55.7 -55.8 65 -99 SPO 1997 10 21 17 50 98 6.0 -9 663.40 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 17 51 98 6.1 -9 663.40 -56.4 -55.7 -55.8 65 -99 SPO 1997 10 21 17 52 99 6.2 -9 663.40 -56.4 -55.8 -55.8 67 -99 SPO 1997 10 21 17 53 99 6.3 -9 663.40 -56.5 -55.7 -55.9 66 -99 SPO 1997 10 21 17 54 98 6.2 -9 663.40 -56.5 -55.7 -55.9 65 -99 SPO 1997 10 21 17 55 98 6.3 -9 663.40 -56.4 -55.7 -55.9 63 -99 SPO 1997 10 21 17 56 99 6.4 -9 663.40 -56.4 -55.7 -55.8 63 -99 SPO 1997 10 21 17 57 97 6.2 -9 663.40 -56.4 -55.7 -55.8 63 -99 SPO 1997 10 21 17 58 98 6.1 -9 663.40 -56.4 -55.7 -55.8 63 -99 SPO 1997 10 21 17 59 99 6.3 -9 663.40 -56.4 -55.7 -55.8 63 -99 SPO 1997 10 21 18 00 100 6.3 -9 663.40 -56.4 -55.7 -55.8 63 0 SPO 1997 10 21 18 01 100 6.4 -9 663.50 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 21 18 02 99 6.4 -9 663.50 -56.4 -55.8 -55.8 64 -99 SPO 1997 10 21 18 03 97 6.4 -9 663.40 -56.4 -55.8 -55.8 64 -99 SPO 1997 10 21 18 04 97 6.0 -9 663.50 -56.4 -55.8 -55.8 64 -99 SPO 1997 10 21 18 05 97 6.0 -9 663.50 -56.4 -55.8 -55.9 64 -99 SPO 1997 10 21 18 06 99 6.3 -9 663.50 -56.5 -55.8 -55.9 64 -99 SPO 1997 10 21 18 07 98 6.0 -9 663.50 -56.5 -55.8 -55.9 64 -99 SPO 1997 10 21 18 08 97 6.0 -9 663.50 -56.5 -55.9 -55.9 64 -99 SPO 1997 10 21 18 09 99 5.9 -9 663.50 -56.5 -55.8 -55.9 64 -99 SPO 1997 10 21 18 10 98 5.9 -9 663.50 -56.5 -55.9 -55.9 61 -99 SPO 1997 10 21 18 11 97 5.7 -9 663.50 -56.5 -55.9 -55.9 62 -99 SPO 1997 10 21 18 12 96 5.3 -9 663.50 -56.5 -55.9 -55.9 64 -99 SPO 1997 10 21 18 13 94 5.8 -9 663.50 -56.5 -55.9 -55.9 64 -99 SPO 1997 10 21 18 14 91 5.7 -9 663.50 -56.5 -56.0 -55.9 62 -99 SPO 1997 10 21 18 15 90 5.6 -9 663.40 -56.6 -55.9 -55.9 62 -99 SPO 1997 10 21 18 16 91 5.7 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 18 17 94 5.3 -9 663.50 -56.6 -56.0 -55.9 62 -99 SPO 1997 10 21 18 18 97 5.3 -9 663.50 -56.6 -56.1 -55.9 62 -99 SPO 1997 10 21 18 19 97 5.3 -9 663.50 -56.6 -56.1 -56.0 62 -99 SPO 1997 10 21 18 20 98 5.2 -9 663.50 -56.7 -56.1 -56.0 61 -99 SPO 1997 10 21 18 21 98 5.1 -9 663.50 -56.8 -56.1 -56.0 62 -99 SPO 1997 10 21 18 22 99 5.3 -9 663.50 -56.7 -56.2 -56.0 61 -99 SPO 1997 10 21 18 23 99 5.5 -9 663.60 -56.7 -56.2 -56.0 63 -99 SPO 1997 10 21 18 24 100 5.2 -9 663.60 -56.7 -56.1 -56.0 63 -99 SPO 1997 10 21 18 25 100 5.1 -9 663.60 -56.7 -56.1 -56.0 63 -99 SPO 1997 10 21 18 26 101 4.9 -9 663.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 21 18 27 102 4.9 -9 663.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 21 18 28 103 4.8 -9 663.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 21 18 29 103 4.8 -9 663.60 -56.8 -56.2 -56.0 64 -99 SPO 1997 10 21 18 30 103 4.9 -9 663.60 -56.8 -56.1 -56.0 62 -99 SPO 1997 10 21 18 31 102 5.1 -9 663.60 -56.8 -56.1 -56.0 60 -99 SPO 1997 10 21 18 32 101 5.2 -9 663.60 -56.7 -56.1 -56.0 60 -99 SPO 1997 10 21 18 33 99 5.3 -9 663.60 -56.8 -56.1 -56.0 60 -99 SPO 1997 10 21 18 34 98 5.2 -9 663.50 -56.8 -56.1 -56.0 60 -99 SPO 1997 10 21 18 35 98 5.2 -9 663.50 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 21 18 36 98 5.2 -9 663.50 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 21 18 37 98 5.5 -9 663.50 -56.9 -56.2 -56.1 64 -99 SPO 1997 10 21 18 38 98 5.5 -9 663.50 -56.9 -56.2 -56.1 64 -99 SPO 1997 10 21 18 39 98 5.5 -9 663.50 -56.9 -56.2 -56.1 64 -99 SPO 1997 10 21 18 40 98 5.5 -9 663.50 -56.9 -56.2 -56.1 65 -99 SPO 1997 10 21 18 41 97 5.5 -9 663.50 -56.9 -56.1 -56.1 65 -99 SPO 1997 10 21 18 42 97 5.7 -9 663.50 -56.9 -56.1 -56.1 64 -99 SPO 1997 10 21 18 43 98 5.6 -9 663.50 -56.9 -56.1 -56.1 64 -99 SPO 1997 10 21 18 44 98 5.5 -9 663.50 -56.9 -56.1 -56.2 64 -99 SPO 1997 10 21 18 45 98 5.5 -9 663.50 -56.9 -56.1 -56.2 64 -99 SPO 1997 10 21 18 46 99 5.6 -9 663.50 -56.9 -56.1 -56.2 64 -99 SPO 1997 10 21 18 47 100 5.4 -9 663.50 -56.9 -56.2 -56.1 64 -99 SPO 1997 10 21 18 48 100 5.4 -9 663.50 -56.9 -56.2 -56.1 63 -99 SPO 1997 10 21 18 49 101 5.5 -9 663.50 -56.9 -56.2 -56.2 63 -99 SPO 1997 10 21 18 50 102 5.7 -9 663.50 -56.9 -56.2 -56.2 64 -99 SPO 1997 10 21 18 51 99 5.4 -9 663.50 -56.9 -56.2 -56.2 64 -99 SPO 1997 10 21 18 52 97 5.7 -9 663.50 -56.9 -56.3 -56.2 65 -99 SPO 1997 10 21 18 53 97 5.8 -9 663.50 -56.9 -56.3 -56.2 65 -99 SPO 1997 10 21 18 54 96 5.8 -9 663.50 -56.9 -56.2 -56.2 64 -99 SPO 1997 10 21 18 55 96 5.9 -9 663.50 -56.9 -56.3 -56.2 64 -99 SPO 1997 10 21 18 56 97 5.8 -9 663.50 -56.9 -56.3 -56.2 64 -99 SPO 1997 10 21 18 57 99 5.8 -9 663.50 -56.9 -56.2 -56.2 64 -99 SPO 1997 10 21 18 58 102 5.7 -9 663.50 -56.9 -56.2 -56.2 64 -99 SPO 1997 10 21 18 59 103 5.5 -9 663.60 -57.0 -56.2 -56.2 65 -99 SPO 1997 10 21 19 00 104 5.6 -9 663.60 -57.0 -56.3 -56.3 65 0 SPO 1997 10 21 19 01 105 5.4 -9 663.60 -57.0 -56.3 -56.3 65 -99 SPO 1997 10 21 19 02 106 5.5 -9 663.60 -57.0 -56.3 -56.3 65 -99 SPO 1997 10 21 19 03 107 5.5 -9 663.60 -57.0 -56.3 -56.4 65 -99 SPO 1997 10 21 19 04 106 5.5 -9 663.60 -57.0 -56.3 -56.3 63 -99 SPO 1997 10 21 19 05 107 5.2 -9 663.60 -57.0 -56.4 -56.3 63 -99 SPO 1997 10 21 19 06 108 5.2 -9 663.60 -57.1 -56.4 -56.4 63 -99 SPO 1997 10 21 19 07 108 5.4 -9 663.60 -57.1 -56.5 -56.4 63 -99 SPO 1997 10 21 19 08 108 5.5 -9 663.60 -57.1 -56.5 -56.4 63 -99 SPO 1997 10 21 19 09 108 5.7 -9 663.60 -57.1 -56.5 -56.5 64 -99 SPO 1997 10 21 19 10 107 5.5 -9 663.60 -57.1 -56.4 -56.5 64 -99 SPO 1997 10 21 19 11 107 5.4 -9 663.60 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 19 12 107 5.7 -9 663.60 -57.1 -56.4 -56.4 63 -99 SPO 1997 10 21 19 13 106 5.9 -9 663.60 -57.0 -56.4 -56.4 62 -99 SPO 1997 10 21 19 14 105 6.0 -9 663.70 -57.1 -56.3 -56.4 64 -99 SPO 1997 10 21 19 15 105 6.1 -9 663.60 -57.1 -56.3 -56.4 64 -99 SPO 1997 10 21 19 16 105 6.2 -9 663.60 -57.0 -56.2 -56.4 62 -99 SPO 1997 10 21 19 17 104 6.2 -9 663.60 -57.0 -56.2 -56.4 62 -99 SPO 1997 10 21 19 18 103 6.1 -9 663.70 -57.0 -56.2 -56.3 62 -99 SPO 1997 10 21 19 19 105 5.9 -9 663.70 -56.9 -56.2 -56.3 61 -99 SPO 1997 10 21 19 20 106 5.8 -9 663.70 -56.9 -56.3 -56.3 61 -99 SPO 1997 10 21 19 21 105 5.8 -9 663.60 -57.0 -56.3 -56.3 62 -99 SPO 1997 10 21 19 22 104 5.8 -9 663.70 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 19 23 104 5.8 -9 663.60 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 19 24 104 5.7 -9 663.60 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 19 25 103 5.8 -9 663.60 -57.1 -56.4 -56.4 66 -99 SPO 1997 10 21 19 26 104 5.7 -9 663.70 -57.1 -56.4 -56.4 66 -99 SPO 1997 10 21 19 27 103 5.8 -9 663.60 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 19 28 102 5.7 -9 663.60 -57.0 -56.3 -56.3 62 -99 SPO 1997 10 21 19 29 101 5.6 -9 663.70 -57.0 -56.3 -56.3 62 -99 SPO 1997 10 21 19 30 100 5.6 -9 663.70 -57.0 -56.3 -56.2 62 -99 SPO 1997 10 21 19 31 97 5.9 -9 663.70 -57.0 -56.3 -56.2 63 -99 SPO 1997 10 21 19 32 98 5.9 -9 663.70 -56.9 -56.3 -56.2 63 -99 SPO 1997 10 21 19 33 97 5.7 -9 663.70 -56.9 -56.3 -56.2 64 -99 SPO 1997 10 21 19 34 98 5.6 -9 663.70 -57.0 -56.3 -56.2 65 -99 SPO 1997 10 21 19 35 99 5.6 -9 663.70 -57.0 -56.3 -56.2 65 -99 SPO 1997 10 21 19 36 98 5.7 -9 663.70 -56.9 -56.3 -56.1 64 -99 SPO 1997 10 21 19 37 97 5.3 -9 663.70 -56.9 -56.3 -56.1 64 -99 SPO 1997 10 21 19 38 95 5.6 -9 663.70 -56.9 -56.3 -56.1 63 -99 SPO 1997 10 21 19 39 94 5.7 -9 663.70 -56.9 -56.3 -56.1 63 -99 SPO 1997 10 21 19 40 92 6.2 -9 663.60 -56.8 -56.3 -56.1 64 -99 SPO 1997 10 21 19 41 90 6.3 -9 663.70 -56.8 -56.3 -56.0 64 -99 SPO 1997 10 21 19 42 90 6.4 -9 663.60 -56.7 -56.3 -56.0 64 -99 SPO 1997 10 21 19 43 90 6.5 -9 663.60 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 44 90 6.6 -9 663.70 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 45 92 6.5 -9 663.70 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 46 93 6.4 -9 663.60 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 47 92 6.5 -9 663.60 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 48 93 6.2 -9 663.60 -56.7 -56.2 -56.0 65 -99 SPO 1997 10 21 19 49 94 6.2 -9 663.70 -56.7 -56.2 -56.0 67 -99 SPO 1997 10 21 19 50 94 6.3 -9 663.70 -56.6 -56.2 -56.0 66 -99 SPO 1997 10 21 19 51 95 6.2 -9 663.70 -56.6 -56.1 -55.9 66 -99 SPO 1997 10 21 19 52 95 6.0 -9 663.70 -56.6 -56.1 -55.9 66 -99 SPO 1997 10 21 19 53 96 6.3 -9 663.70 -56.6 -56.1 -55.9 64 -99 SPO 1997 10 21 19 54 95 5.7 -9 663.70 -56.6 -56.2 -55.9 64 -99 SPO 1997 10 21 19 55 96 5.9 -9 663.70 -56.6 -56.2 -55.9 63 -99 SPO 1997 10 21 19 56 96 5.6 -9 663.70 -56.7 -56.2 -55.9 64 -99 SPO 1997 10 21 19 57 95 5.5 -9 663.70 -56.6 -56.3 -55.9 64 -99 SPO 1997 10 21 19 58 95 5.7 -9 663.70 -56.7 -56.3 -55.9 65 -99 SPO 1997 10 21 19 59 97 5.4 -9 663.70 -56.6 -56.3 -55.9 66 -99 SPO 1997 10 21 20 00 98 5.3 -9 663.70 -56.7 -56.3 -55.9 67 0 SPO 1997 10 21 20 01 98 5.3 -9 663.70 -56.8 -56.3 -55.9 68 -99 SPO 1997 10 21 20 02 96 5.5 -9 663.70 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 03 97 5.5 -9 663.70 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 04 97 5.6 -9 663.70 -56.8 -56.3 -55.9 64 -99 SPO 1997 10 21 20 05 97 5.4 -9 663.70 -56.8 -56.3 -55.9 64 -99 SPO 1997 10 21 20 06 98 5.6 -9 663.70 -56.8 -56.3 -55.9 64 -99 SPO 1997 10 21 20 07 100 5.5 -9 663.70 -56.7 -56.3 -55.9 63 -99 SPO 1997 10 21 20 08 100 5.7 -9 663.70 -56.8 -56.3 -55.9 64 -99 SPO 1997 10 21 20 09 101 5.7 -9 663.70 -56.7 -56.2 -55.9 63 -99 SPO 1997 10 21 20 10 100 5.3 -9 663.70 -56.7 -56.2 -55.9 64 -99 SPO 1997 10 21 20 11 98 5.6 -9 663.70 -56.8 -56.2 -55.9 64 -99 SPO 1997 10 21 20 12 96 5.7 -9 663.70 -56.7 -56.2 -55.9 63 -99 SPO 1997 10 21 20 13 96 5.9 -9 663.70 -56.7 -56.3 -55.9 64 -99 SPO 1997 10 21 20 14 95 5.8 -9 663.70 -56.7 -56.3 -55.9 65 -99 SPO 1997 10 21 20 15 95 5.7 -9 663.70 -56.7 -56.3 -55.9 65 -99 SPO 1997 10 21 20 16 94 5.6 -9 663.70 -56.8 -56.3 -56.0 66 -99 SPO 1997 10 21 20 17 96 5.5 -9 663.70 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 18 96 5.3 -9 663.80 -56.7 -56.3 -55.9 65 -99 SPO 1997 10 21 20 19 95 5.2 -9 663.70 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 20 95 5.2 -9 663.80 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 21 95 5.3 -9 663.80 -56.8 -56.3 -55.9 66 -99 SPO 1997 10 21 20 22 96 4.9 -9 663.90 -56.8 -56.3 -55.9 -99 -99 SPO 1997 10 21 20 23 97 4.9 -9 663.90 -56.8 -56.3 -55.9 -99 -99 SPO 1997 10 21 20 24 97 4.9 -9 663.90 -56.8 -56.3 -55.9 -99 -99 SPO 1997 10 21 20 25 97 4.7 -9 663.90 -56.7 -56.3 -55.9 -99 -99 SPO 1997 10 21 20 26 -999 -99.9 -9 663.90 -56.8 -56.3 -55.9 -99 -99 SPO 1997 10 21 20 27 100 4.7 -9 663.90 -56.7 -56.1 -55.9 -99 -99 SPO 1997 10 21 20 28 -999 -99.9 -9 663.90 -56.6 -56.2 -56.0 -99 -99 SPO 1997 10 21 20 29 102 4.9 -9 663.90 -56.8 -56.3 -56.0 -99 -99 SPO 1997 10 21 20 30 101 5.0 -9 663.90 -56.8 -56.4 -56.0 68 -99 SPO 1997 10 21 20 31 103 4.9 -9 663.90 -56.9 -56.4 -56.1 69 -99 SPO 1997 10 21 20 32 105 5.0 -9 663.90 -56.9 -56.4 -56.1 68 -99 SPO 1997 10 21 20 33 105 4.8 -9 663.90 -56.9 -56.5 -56.2 68 -99 SPO 1997 10 21 20 34 107 4.9 -9 663.90 -57.0 -56.4 -56.2 69 -99 SPO 1997 10 21 20 35 105 4.7 -9 663.90 -57.0 -56.4 -56.2 69 -99 SPO 1997 10 21 20 36 106 5.0 -9 663.90 -56.9 -56.4 -56.2 68 -99 SPO 1997 10 21 20 37 106 5.0 -9 663.90 -57.0 -56.4 -56.2 69 -99 SPO 1997 10 21 20 38 105 5.0 -9 663.90 -57.0 -56.4 -56.2 69 -99 SPO 1997 10 21 20 39 105 5.1 -9 663.90 -56.9 -56.4 -56.2 68 -99 SPO 1997 10 21 20 40 105 5.3 -9 663.90 -56.9 -56.4 -56.2 68 -99 SPO 1997 10 21 20 41 104 5.1 -9 663.90 -57.0 -56.4 -56.2 68 -99 SPO 1997 10 21 20 42 103 4.8 -9 663.90 -57.0 -56.4 -56.2 68 -99 SPO 1997 10 21 20 43 102 5.2 -9 663.80 -56.9 -56.4 -56.2 67 -99 SPO 1997 10 21 20 44 100 5.2 -9 663.80 -56.9 -56.4 -56.2 67 -99 SPO 1997 10 21 20 45 98 5.4 -9 663.80 -56.9 -56.4 -56.2 67 -99 SPO 1997 10 21 20 46 97 5.2 -9 663.80 -56.8 -56.4 -56.1 66 -99 SPO 1997 10 21 20 47 97 5.3 -9 663.80 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 20 48 96 5.4 -9 663.80 -56.8 -56.5 -56.2 66 -99 SPO 1997 10 21 20 49 97 5.3 -9 663.80 -56.8 -56.5 -56.2 66 -99 SPO 1997 10 21 20 50 97 5.4 -9 663.80 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 20 51 97 5.3 -9 663.80 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 20 52 97 5.3 -9 663.80 -56.9 -56.4 -56.2 67 -99 SPO 1997 10 21 20 53 98 5.4 -9 663.80 -56.8 -56.4 -56.2 66 -99 SPO 1997 10 21 20 54 98 5.2 -9 663.80 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 20 55 97 5.2 -9 663.90 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 20 56 96 5.2 -9 663.90 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 20 57 95 5.6 -9 663.90 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 20 58 96 5.2 -9 663.90 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 20 59 96 5.2 -9 663.90 -56.8 -56.4 -56.2 64 -99 SPO 1997 10 21 21 00 96 5.5 -9 663.90 -56.8 -56.4 -56.2 64 0 SPO 1997 10 21 21 01 95 5.4 -9 663.90 -56.8 -56.4 -56.2 66 -99 SPO 1997 10 21 21 02 92 5.1 -9 663.90 -56.9 -56.4 -56.2 67 -99 SPO 1997 10 21 21 03 90 5.0 -9 663.90 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 21 04 89 5.1 -9 663.90 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 21 05 86 5.0 -9 663.90 -56.9 -56.5 -56.2 67 -99 SPO 1997 10 21 21 06 85 5.0 -9 664.00 -56.9 -56.5 -56.2 65 -99 SPO 1997 10 21 21 07 85 4.9 -9 664.00 -56.9 -56.5 -56.3 64 -99 SPO 1997 10 21 21 08 86 5.0 -9 664.00 -56.9 -56.5 -56.3 64 -99 SPO 1997 10 21 21 09 86 4.8 -9 664.00 -56.9 -56.5 -56.3 64 -99 SPO 1997 10 21 21 10 88 4.8 -9 664.00 -57.0 -56.5 -56.3 65 -99 SPO 1997 10 21 21 11 88 4.7 -9 664.00 -57.0 -56.5 -56.3 65 -99 SPO 1997 10 21 21 12 89 4.8 -9 664.00 -56.9 -56.5 -56.2 64 -99 SPO 1997 10 21 21 13 90 4.3 -9 664.00 -57.0 -56.5 -56.3 66 -99 SPO 1997 10 21 21 14 90 4.5 -9 664.00 -57.0 -56.5 -56.2 65 -99 SPO 1997 10 21 21 15 89 4.3 -9 664.10 -57.0 -56.5 -56.2 65 -99 SPO 1997 10 21 21 16 90 4.3 -9 664.10 -57.0 -56.5 -56.2 65 -99 SPO 1997 10 21 21 17 91 4.5 -9 664.10 -57.1 -56.5 -56.2 64 -99 SPO 1997 10 21 21 18 92 4.4 -9 664.10 -57.1 -56.5 -56.2 64 -99 SPO 1997 10 21 21 19 91 4.4 -9 664.00 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 21 21 20 92 4.5 -9 664.00 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 21 21 21 91 4.4 -9 664.00 -57.2 -56.5 -56.3 65 -99 SPO 1997 10 21 21 22 89 4.7 -9 664.00 -57.2 -56.5 -56.3 65 -99 SPO 1997 10 21 21 23 90 4.6 -9 664.00 -57.2 -56.5 -56.4 65 -99 SPO 1997 10 21 21 24 92 5.0 -9 664.00 -57.2 -56.4 -56.4 65 -99 SPO 1997 10 21 21 25 92 4.9 -9 664.00 -57.1 -56.4 -56.4 64 -99 SPO 1997 10 21 21 26 89 4.9 -9 663.90 -57.2 -56.4 -56.5 65 -99 SPO 1997 10 21 21 27 88 5.0 -9 663.90 -57.2 -56.4 -56.5 65 -99 SPO 1997 10 21 21 28 88 5.2 -9 663.90 -57.2 -56.4 -56.5 65 -99 SPO 1997 10 21 21 29 89 5.2 -9 664.00 -57.0 -56.4 -56.6 63 -99 SPO 1997 10 21 21 30 90 5.1 -9 663.90 -57.1 -56.4 -56.6 64 -99 SPO 1997 10 21 21 31 90 5.1 -9 664.00 -57.1 -56.4 -56.6 64 -99 SPO 1997 10 21 21 32 91 5.3 -9 663.90 -57.1 -56.4 -56.6 64 -99 SPO 1997 10 21 21 33 91 5.4 -9 663.90 -57.1 -56.4 -56.6 64 -99 SPO 1997 10 21 21 34 91 5.3 -9 663.90 -57.2 -56.5 -56.6 65 -99 SPO 1997 10 21 21 35 90 5.5 -9 663.90 -57.2 -56.5 -56.6 67 -99 SPO 1997 10 21 21 36 91 5.6 -9 663.80 -57.2 -56.5 -56.6 67 -99 SPO 1997 10 21 21 37 92 5.7 -9 663.80 -57.2 -56.5 -56.6 67 -99 SPO 1997 10 21 21 38 92 5.6 -9 663.80 -57.2 -56.5 -56.7 67 -99 SPO 1997 10 21 21 39 92 5.6 -9 663.80 -57.2 -56.5 -56.7 67 -99 SPO 1997 10 21 21 40 93 5.5 -9 663.80 -57.2 -56.5 -56.7 67 -99 SPO 1997 10 21 21 41 94 5.6 -9 663.80 -57.2 -56.5 -56.7 67 -99 SPO 1997 10 21 21 42 95 5.6 -9 663.80 -57.3 -56.5 -56.7 67 -99 SPO 1997 10 21 21 43 94 5.5 -9 663.90 -57.3 -56.5 -56.7 66 -99 SPO 1997 10 21 21 44 94 5.5 -9 663.90 -57.3 -56.5 -56.7 66 -99 SPO 1997 10 21 21 45 93 5.5 -9 664.00 -57.3 -56.5 -56.8 67 -99 SPO 1997 10 21 21 46 92 5.5 -9 664.00 -57.2 -56.5 -56.8 67 -99 SPO 1997 10 21 21 47 92 5.5 -9 664.00 -57.2 -56.5 -56.8 68 -99 SPO 1997 10 21 21 48 93 5.6 -9 664.00 -57.2 -56.5 -56.8 68 -99 SPO 1997 10 21 21 49 95 5.5 -9 664.00 -57.2 -56.5 -56.7 68 -99 SPO 1997 10 21 21 50 96 5.5 -9 664.00 -57.2 -56.5 -56.7 68 -99 SPO 1997 10 21 21 51 97 5.3 -9 664.00 -57.2 -56.6 -56.8 69 -99 SPO 1997 10 21 21 52 97 5.2 -9 664.00 -57.3 -56.6 -56.8 70 -99 SPO 1997 10 21 21 53 96 5.1 -9 664.10 -57.3 -56.6 -56.8 68 -99 SPO 1997 10 21 21 54 96 5.0 -9 664.10 -57.4 -56.6 -56.8 68 -99 SPO 1997 10 21 21 55 96 4.9 -9 664.10 -57.4 -56.6 -56.8 68 -99 SPO 1997 10 21 21 56 95 4.8 -9 664.10 -57.4 -56.5 -56.7 67 -99 SPO 1997 10 21 21 57 97 4.8 -9 664.10 -57.4 -56.5 -56.7 67 -99 SPO 1997 10 21 21 58 98 4.7 -9 664.10 -57.4 -56.5 -56.7 64 -99 SPO 1997 10 21 21 59 97 4.7 -9 664.10 -57.4 -56.5 -56.7 64 -99 SPO 1997 10 21 22 00 97 4.7 -9 664.10 -57.4 -56.5 -56.6 64 0 SPO 1997 10 21 22 01 98 4.9 -9 664.10 -57.4 -56.5 -56.6 64 -99 SPO 1997 10 21 22 02 97 5.0 -9 664.10 -57.4 -56.5 -56.6 64 -99 SPO 1997 10 21 22 03 98 5.0 -9 664.10 -57.4 -56.5 -56.6 64 -99 SPO 1997 10 21 22 04 98 5.1 -9 664.10 -57.4 -56.5 -56.5 64 -99 SPO 1997 10 21 22 05 97 5.4 -9 664.10 -57.4 -56.5 -56.5 63 -99 SPO 1997 10 21 22 06 97 5.3 -9 664.10 -57.4 -56.5 -56.5 63 -99 SPO 1997 10 21 22 07 99 5.5 -9 664.10 -57.4 -56.6 -56.5 63 -99 SPO 1997 10 21 22 08 100 5.5 -9 664.10 -57.3 -56.6 -56.5 62 -99 SPO 1997 10 21 22 09 101 5.5 -9 664.10 -57.4 -56.6 -56.5 63 -99 SPO 1997 10 21 22 10 102 5.6 -9 664.10 -57.4 -56.6 -56.5 64 -99 SPO 1997 10 21 22 11 102 5.6 -9 664.10 -57.4 -56.6 -56.6 64 -99 SPO 1997 10 21 22 12 103 5.7 -9 664.10 -57.4 -56.6 -56.6 64 -99 SPO 1997 10 21 22 13 102 5.6 -9 664.10 -57.5 -56.6 -56.6 65 -99 SPO 1997 10 21 22 14 101 5.6 -9 664.10 -57.5 -56.6 -56.6 65 -99 SPO 1997 10 21 22 15 101 5.8 -9 664.10 -57.5 -56.5 -56.6 65 -99 SPO 1997 10 21 22 16 101 5.9 -9 664.10 -57.5 -56.5 -56.6 65 -99 SPO 1997 10 21 22 17 101 5.8 -9 664.10 -57.5 -56.5 -56.6 65 -99 SPO 1997 10 21 22 18 101 5.8 -9 664.10 -57.5 -56.5 -56.6 65 -99 SPO 1997 10 21 22 19 101 5.8 -9 664.10 -57.5 -56.5 -56.6 63 -99 SPO 1997 10 21 22 20 101 5.8 -9 664.10 -57.5 -56.5 -56.7 63 -99 SPO 1997 10 21 22 21 100 5.9 -9 664.10 -57.5 -56.6 -56.7 63 -99 SPO 1997 10 21 22 22 100 5.9 -9 664.00 -57.6 -56.6 -56.8 64 -99 SPO 1997 10 21 22 23 100 6.0 -9 664.00 -57.6 -56.6 -56.9 64 -99 SPO 1997 10 21 22 24 99 6.2 -9 664.00 -57.6 -56.6 -56.9 66 -99 SPO 1997 10 21 22 25 98 6.1 -9 664.00 -57.6 -56.6 -57.0 66 -99 SPO 1997 10 21 22 26 98 6.1 -9 664.00 -57.6 -56.6 -57.0 66 -99 SPO 1997 10 21 22 27 98 5.9 -9 664.00 -57.6 -56.5 -57.0 66 -99 SPO 1997 10 21 22 28 97 5.8 -9 664.00 -57.6 -56.5 -57.0 66 -99 SPO 1997 10 21 22 29 98 5.9 -9 664.00 -57.6 -56.5 -57.0 66 -99 SPO 1997 10 21 22 30 98 5.8 -9 664.00 -57.6 -56.5 -57.0 66 -99 SPO 1997 10 21 22 31 97 5.9 -9 664.10 -57.6 -56.5 -57.0 66 -99 SPO 1997 10 21 22 32 99 6.0 -9 664.00 -57.5 -56.4 -57.0 65 -99 SPO 1997 10 21 22 33 98 6.0 -9 664.00 -57.5 -56.5 -57.0 65 -99 SPO 1997 10 21 22 34 97 5.6 -9 664.00 -57.5 -56.5 -57.0 65 -99 SPO 1997 10 21 22 35 97 5.7 -9 664.00 -57.5 -56.5 -57.0 65 -99 SPO 1997 10 21 22 36 97 5.8 -9 664.00 -57.5 -56.5 -57.0 65 -99 SPO 1997 10 21 22 37 97 5.7 -9 664.00 -57.5 -56.5 -57.0 65 -99 SPO 1997 10 21 22 38 97 5.9 -9 664.00 -57.6 -56.5 -57.1 66 -99 SPO 1997 10 21 22 39 97 5.7 -9 664.00 -57.6 -56.5 -57.1 67 -99 SPO 1997 10 21 22 40 96 5.7 -9 664.00 -57.6 -56.5 -57.1 67 -99 SPO 1997 10 21 22 41 96 5.7 -9 664.00 -57.6 -56.5 -57.1 67 -99 SPO 1997 10 21 22 42 96 5.5 -9 664.00 -57.6 -56.5 -57.1 67 -99 SPO 1997 10 21 22 43 96 5.6 -9 664.00 -57.6 -56.4 -57.1 66 -99 SPO 1997 10 21 22 44 96 5.5 -9 664.10 -57.6 -56.4 -57.1 66 -99 SPO 1997 10 21 22 45 96 5.5 -9 664.10 -57.6 -56.4 -57.0 66 -99 SPO 1997 10 21 22 46 98 5.4 -9 664.10 -57.5 -56.4 -57.0 65 -99 SPO 1997 10 21 22 47 97 5.4 -9 664.10 -57.5 -56.4 -57.0 65 -99 SPO 1997 10 21 22 48 97 5.3 -9 664.10 -57.5 -56.4 -57.0 65 -99 SPO 1997 10 21 22 49 96 5.2 -9 664.10 -57.4 -56.4 -56.9 64 -99 SPO 1997 10 21 22 50 96 5.0 -9 664.10 -57.3 -56.3 -56.8 64 -99 SPO 1997 10 21 22 51 96 5.0 -9 664.10 -57.3 -56.3 -56.8 64 -99 SPO 1997 10 21 22 52 95 5.2 -9 664.20 -57.2 -56.3 -56.7 63 -99 SPO 1997 10 21 22 53 93 5.1 -9 664.20 -57.2 -56.4 -56.6 63 -99 SPO 1997 10 21 22 54 92 4.9 -9 664.20 -57.2 -56.4 -56.4 65 -99 SPO 1997 10 21 22 55 91 4.8 -9 664.20 -57.2 -56.5 -56.4 65 -99 SPO 1997 10 21 22 56 90 5.1 -9 664.20 -57.2 -56.5 -56.3 65 -99 SPO 1997 10 21 22 57 92 4.9 -9 664.20 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 21 22 58 92 5.1 -9 664.20 -57.1 -56.4 -56.3 64 -99 SPO 1997 10 21 22 59 91 5.0 -9 664.20 -57.1 -56.4 -56.3 66 -99 SPO 1997 10 21 23 00 91 5.0 -9 664.30 -57.1 -56.4 -56.2 66 0 SPO 1997 10 21 23 01 92 5.1 -9 664.30 -57.1 -56.4 -56.2 67 -99 SPO 1997 10 21 23 02 94 5.2 -9 664.30 -57.0 -56.5 -56.2 66 -99 SPO 1997 10 21 23 03 94 4.9 -9 664.40 -57.1 -56.5 -56.2 67 -99 SPO 1997 10 21 23 04 95 5.1 -9 664.30 -57.1 -56.5 -56.2 67 -99 SPO 1997 10 21 23 05 95 4.9 -9 664.40 -57.2 -56.5 -56.2 68 -99 SPO 1997 10 21 23 06 95 5.2 -9 664.40 -57.1 -56.5 -56.2 67 -99 SPO 1997 10 21 23 07 93 5.2 -9 664.40 -57.1 -56.4 -56.2 66 -99 SPO 1997 10 21 23 08 93 5.0 -9 664.40 -57.1 -56.4 -56.2 66 -99 SPO 1997 10 21 23 09 93 5.2 -9 664.40 -57.1 -56.5 -56.2 66 -99 SPO 1997 10 21 23 10 95 5.1 -9 664.40 -57.1 -56.5 -56.2 66 -99 SPO 1997 10 21 23 11 95 5.3 -9 664.40 -57.2 -56.5 -56.2 67 -99 SPO 1997 10 21 23 12 97 5.6 -9 664.40 -57.2 -56.5 -56.3 67 -99 SPO 1997 10 21 23 13 98 5.5 -9 664.40 -57.2 -56.4 -56.3 67 -99 SPO 1997 10 21 23 14 97 5.3 -9 664.40 -57.2 -56.5 -56.3 67 -99 SPO 1997 10 21 23 15 98 5.3 -9 664.40 -57.2 -56.5 -56.3 67 -99 SPO 1997 10 21 23 16 98 5.3 -9 664.40 -57.2 -56.4 -56.4 67 -99 SPO 1997 10 21 23 17 98 5.3 -9 664.40 -57.2 -56.4 -56.6 67 -99 SPO 1997 10 21 23 18 97 5.5 -9 664.40 -57.2 -56.4 -56.7 67 -99 SPO 1997 10 21 23 19 97 5.6 -9 664.40 -57.2 -56.3 -56.7 67 -99 SPO 1997 10 21 23 20 97 5.8 -9 664.40 -57.2 -56.3 -56.7 67 -99 SPO 1997 10 21 23 21 97 5.7 -9 664.40 -57.2 -56.3 -56.6 65 -99 SPO 1997 10 21 23 22 98 5.8 -9 664.40 -57.2 -56.3 -56.5 65 -99 SPO 1997 10 21 23 23 98 5.8 -9 664.40 -57.3 -56.3 -56.4 66 -99 SPO 1997 10 21 23 24 97 5.9 -9 664.40 -57.3 -56.3 -56.4 67 -99 SPO 1997 10 21 23 25 97 5.8 -9 664.40 -57.3 -56.4 -56.3 66 -99 SPO 1997 10 21 23 26 97 5.7 -9 664.40 -57.3 -56.4 -56.3 66 -99 SPO 1997 10 21 23 27 98 5.9 -9 664.50 -57.3 -56.4 -56.4 67 -99 SPO 1997 10 21 23 28 100 6.1 -9 664.50 -57.3 -56.4 -56.6 67 -99 SPO 1997 10 21 23 29 101 6.2 -9 664.50 -57.2 -56.4 -56.7 67 -99 SPO 1997 10 21 23 30 102 6.4 -9 664.40 -57.3 -56.4 -56.7 67 -99 SPO 1997 10 21 23 31 103 6.3 -9 664.40 -57.3 -56.4 -56.7 66 -99 SPO 1997 10 21 23 32 103 6.4 -9 664.40 -57.2 -56.4 -56.6 65 -99 SPO 1997 10 21 23 33 104 6.5 -9 664.40 -57.3 -56.4 -56.6 66 -99 SPO 1997 10 21 23 34 104 6.2 -9 664.40 -57.3 -56.4 -56.5 66 -99 SPO 1997 10 21 23 35 105 6.2 -9 664.50 -57.3 -56.5 -56.5 66 -99 SPO 1997 10 21 23 36 105 6.2 -9 664.50 -57.3 -56.5 -56.5 66 -99 SPO 1997 10 21 23 37 104 6.2 -9 664.50 -57.3 -56.5 -56.5 66 -99 SPO 1997 10 21 23 38 104 6.0 -9 664.50 -57.3 -56.5 -56.5 67 -99 SPO 1997 10 21 23 39 103 5.7 -9 664.50 -57.3 -56.5 -56.4 67 -99 SPO 1997 10 21 23 40 102 5.9 -9 664.50 -57.3 -56.6 -56.5 66 -99 SPO 1997 10 21 23 41 102 5.8 -9 664.50 -57.3 -56.5 -56.5 66 -99 SPO 1997 10 21 23 42 102 6.0 -9 664.50 -57.3 -56.5 -56.6 66 -99 SPO 1997 10 21 23 43 102 6.1 -9 664.50 -57.3 -56.5 -56.5 66 -99 SPO 1997 10 21 23 44 102 6.0 -9 664.50 -57.3 -56.5 -56.4 66 -99 SPO 1997 10 21 23 45 103 5.9 -9 664.50 -57.3 -56.5 -56.4 66 -99 SPO 1997 10 21 23 46 102 5.7 -9 664.50 -57.3 -56.5 -56.4 66 -99 SPO 1997 10 21 23 47 102 5.6 -9 664.50 -57.4 -56.5 -56.4 67 -99 SPO 1997 10 21 23 48 101 5.8 -9 664.50 -57.4 -56.4 -56.4 67 -99 SPO 1997 10 21 23 49 101 5.7 -9 664.50 -57.3 -56.4 -56.4 66 -99 SPO 1997 10 21 23 50 102 5.8 -9 664.50 -57.3 -56.4 -56.4 66 -99 SPO 1997 10 21 23 51 101 5.8 -9 664.50 -57.3 -56.4 -56.4 66 -99 SPO 1997 10 21 23 52 102 5.8 -9 664.50 -57.3 -56.4 -56.4 66 -99 SPO 1997 10 21 23 53 102 5.9 -9 664.50 -57.3 -56.3 -56.4 66 -99 SPO 1997 10 21 23 54 103 5.9 -9 664.50 -57.3 -56.3 -56.4 66 -99 SPO 1997 10 21 23 55 103 5.9 -9 664.50 -57.3 -56.3 -56.4 66 -99 SPO 1997 10 21 23 56 103 6.0 -9 664.50 -57.3 -56.3 -56.4 64 -99 SPO 1997 10 21 23 57 103 6.1 -9 664.50 -57.2 -56.3 -56.4 63 -99 SPO 1997 10 21 23 58 103 6.1 -9 664.50 -57.2 -56.3 -56.4 -99 -99 SPO 1997 10 21 23 59 102 6.0 -9 664.50 -57.3 -56.3 -56.4 -99 -99 SPO 1997 10 22 00 00 101 5.9 -9 664.50 -57.3 -56.3 -56.4 -99 0 SPO 1997 10 22 00 01 101 5.9 -9 664.50 -57.2 -56.3 -56.4 -99 -99 SPO 1997 10 22 00 02 101 6.0 -9 664.50 -57.3 -56.3 -56.4 -99 -99 SPO 1997 10 22 00 03 100 5.8 -9 664.50 -57.3 -56.3 -56.4 65 -99 SPO 1997 10 22 00 04 100 5.9 -9 664.50 -57.3 -56.2 -56.4 66 -99 SPO 1997 10 22 00 05 100 5.9 -9 664.60 -57.3 -56.2 -56.3 65 -99 SPO 1997 10 22 00 06 100 6.1 -9 664.60 -57.3 -56.2 -56.3 66 -99 SPO 1997 10 22 00 07 100 6.2 -9 664.60 -57.3 -56.1 -56.4 66 -99 SPO 1997 10 22 00 08 100 6.2 -9 664.60 -57.2 -56.1 -56.3 65 -99 SPO 1997 10 22 00 09 101 6.2 -9 664.50 -57.2 -56.1 -56.4 64 -99 SPO 1997 10 22 00 10 101 6.2 -9 664.50 -57.2 -56.1 -56.4 64 -99 SPO 1997 10 22 00 11 101 6.2 -9 664.50 -57.2 -56.1 -56.4 64 -99 SPO 1997 10 22 00 12 100 6.1 -9 664.50 -57.2 -56.1 -56.4 64 -99 SPO 1997 10 22 00 13 99 5.9 -9 664.60 -57.2 -56.1 -56.3 64 -99 SPO 1997 10 22 00 14 99 5.7 -9 664.60 -57.2 -56.2 -56.3 65 -99 SPO 1997 10 22 00 15 100 5.8 -9 664.60 -57.3 -56.2 -56.3 66 -99 SPO 1997 10 22 00 16 101 5.8 -9 664.60 -57.3 -56.2 -56.3 66 -99 SPO 1997 10 22 00 17 103 5.9 -9 664.60 -57.3 -56.2 -56.3 66 -99 SPO 1997 10 22 00 18 103 6.2 -9 664.60 -57.2 -56.2 -56.4 65 -99 SPO 1997 10 22 00 19 104 6.3 -9 664.60 -57.2 -56.2 -56.4 65 -99 SPO 1997 10 22 00 20 104 6.4 -9 664.60 -57.3 -56.2 -56.5 66 -99 SPO 1997 10 22 00 21 104 6.5 -9 664.60 -57.2 -56.2 -56.5 64 -99 SPO 1997 10 22 00 22 105 6.7 -9 664.60 -57.2 -56.2 -56.5 64 -99 SPO 1997 10 22 00 23 105 6.7 -9 664.60 -57.2 -56.2 -56.5 65 -99 SPO 1997 10 22 00 24 106 6.6 -9 664.60 -57.2 -56.3 -56.6 65 -99 SPO 1997 10 22 00 25 106 6.6 -9 664.60 -57.2 -56.3 -56.8 65 -99 SPO 1997 10 22 00 26 107 6.6 -9 664.60 -57.2 -56.3 -56.8 65 -99 SPO 1997 10 22 00 27 109 6.6 -9 664.60 -57.2 -56.4 -56.9 65 -99 SPO 1997 10 22 00 28 110 6.7 -9 664.60 -57.2 -56.4 -56.9 64 -99 SPO 1997 10 22 00 29 110 6.7 -9 664.60 -57.2 -56.5 -56.9 64 -99 SPO 1997 10 22 00 30 110 6.6 -9 664.60 -57.2 -56.5 -56.9 65 -99 SPO 1997 10 22 00 31 110 6.8 -9 664.60 -57.2 -56.6 -56.9 65 -99 SPO 1997 10 22 00 32 110 6.9 -9 664.60 -57.2 -56.6 -57.0 64 -99 SPO 1997 10 22 00 33 110 7.1 -9 664.60 -57.2 -56.6 -57.1 63 -99 SPO 1997 10 22 00 34 110 7.1 -9 664.60 -57.2 -56.6 -57.1 63 -99 SPO 1997 10 22 00 35 111 7.1 -9 664.60 -57.2 -56.5 -57.1 63 -99 SPO 1997 10 22 00 36 111 7.1 -9 664.60 -57.2 -56.5 -57.1 63 -99 SPO 1997 10 22 00 37 110 7.2 -9 664.60 -57.2 -56.5 -57.0 64 -99 SPO 1997 10 22 00 38 109 7.1 -9 664.60 -57.2 -56.5 -57.1 64 -99 SPO 1997 10 22 00 39 108 7.1 -9 664.60 -57.2 -56.5 -57.1 64 -99 SPO 1997 10 22 00 40 108 7.1 -9 664.60 -57.2 -56.5 -57.1 64 -99 SPO 1997 10 22 00 41 107 7.0 -9 664.60 -57.2 -56.5 -57.1 64 -99 SPO 1997 10 22 00 42 107 6.7 -9 664.60 -57.2 -56.5 -57.0 64 -99 SPO 1997 10 22 00 43 106 6.7 -9 664.60 -57.2 -56.5 -56.9 63 -99 SPO 1997 10 22 00 44 106 6.5 -9 664.60 -57.2 -56.5 -56.8 63 -99 SPO 1997 10 22 00 45 105 6.3 -9 664.60 -57.2 -56.5 -56.7 63 -99 SPO 1997 10 22 00 46 105 6.3 -9 664.60 -57.2 -56.6 -56.7 63 -99 SPO 1997 10 22 00 47 104 6.1 -9 664.60 -57.3 -56.6 -56.7 63 -99 SPO 1997 10 22 00 48 104 6.1 -9 664.60 -57.3 -56.5 -56.7 63 -99 SPO 1997 10 22 00 49 104 6.1 -9 664.60 -57.3 -56.5 -56.7 64 -99 SPO 1997 10 22 00 50 104 6.0 -9 664.60 -57.3 -56.5 -56.6 64 -99 SPO 1997 10 22 00 51 103 5.7 -9 664.60 -57.3 -56.5 -56.6 65 -99 SPO 1997 10 22 00 52 103 5.6 -9 664.60 -57.4 -56.4 -56.6 65 -99 SPO 1997 10 22 00 53 103 5.6 -9 664.60 -57.4 -56.4 -56.6 65 -99 SPO 1997 10 22 00 54 102 5.5 -9 664.60 -57.4 -56.3 -56.5 65 -99 SPO 1997 10 22 00 55 100 5.6 -9 664.60 -57.3 -56.3 -56.4 64 -99 SPO 1997 10 22 00 56 100 5.6 -9 664.60 -57.3 -56.3 -56.4 63 -99 SPO 1997 10 22 00 57 100 5.6 -9 664.60 -57.3 -56.2 -56.4 63 -99 SPO 1997 10 22 00 58 100 5.6 -9 664.60 -57.3 -56.2 -56.4 63 -99 SPO 1997 10 22 00 59 102 5.8 -9 664.60 -57.2 -56.2 -56.4 62 -99 SPO 1997 10 22 01 00 102 5.7 -9 664.60 -57.2 -56.2 -56.4 62 0 SPO 1997 10 22 01 01 103 5.7 -9 664.60 -57.2 -56.2 -56.4 62 -99 SPO 1997 10 22 01 02 101 5.9 -9 664.60 -57.2 -56.2 -56.4 62 -99 SPO 1997 10 22 01 03 99 5.9 -9 664.60 -57.1 -56.2 -56.3 62 -99 SPO 1997 10 22 01 04 99 6.0 -9 664.50 -57.1 -56.1 -56.3 62 -99 SPO 1997 10 22 01 05 98 6.0 -9 664.50 -57.0 -56.1 -56.2 61 -99 SPO 1997 10 22 01 06 99 6.0 -9 664.50 -57.0 -56.1 -56.2 62 -99 SPO 1997 10 22 01 07 98 5.6 -9 664.60 -56.9 -56.1 -56.2 61 -99 SPO 1997 10 22 01 08 98 5.8 -9 664.60 -56.9 -56.1 -56.1 63 -99 SPO 1997 10 22 01 09 99 5.6 -9 664.60 -56.9 -56.1 -56.1 63 -99 SPO 1997 10 22 01 10 99 5.5 -9 664.60 -56.9 -56.1 -56.1 63 -99 SPO 1997 10 22 01 11 97 5.6 -9 664.60 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 12 97 5.6 -9 664.60 -56.9 -56.2 -56.0 -99 -99 SPO 1997 10 22 01 13 96 5.6 -9 664.60 -56.9 -56.2 -56.0 -99 -99 SPO 1997 10 22 01 14 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 22 01 15 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 22 01 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 22 01 17 -999 -99.9 -9 664.60 -56.9 -56.3 -56.0 -99 -99 SPO 1997 10 22 01 18 97 5.6 -9 664.60 -56.9 -56.3 -56.0 -99 -99 SPO 1997 10 22 01 19 99 5.7 -9 664.60 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 01 20 98 5.9 -9 664.60 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 01 21 97 5.7 -9 664.60 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 01 22 97 6.0 -9 664.60 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 23 95 5.9 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 24 95 5.9 -9 664.60 -56.9 -56.1 -56.0 65 -99 SPO 1997 10 22 01 25 93 5.8 -9 664.60 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 01 26 92 5.7 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 27 92 5.9 -9 664.60 -56.9 -56.1 -56.0 65 -99 SPO 1997 10 22 01 28 93 6.1 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 29 93 5.9 -9 664.60 -56.8 -56.1 -56.0 65 -99 SPO 1997 10 22 01 30 92 6.1 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 31 91 5.9 -9 664.60 -56.8 -56.2 -56.0 64 -99 SPO 1997 10 22 01 32 89 5.9 -9 664.60 -56.8 -56.2 -56.0 65 -99 SPO 1997 10 22 01 33 91 6.0 -9 664.60 -56.8 -56.2 -56.0 65 -99 SPO 1997 10 22 01 34 92 6.2 -9 664.60 -56.8 -56.2 -56.0 65 -99 SPO 1997 10 22 01 35 92 6.2 -9 664.60 -56.8 -56.2 -56.0 65 -99 SPO 1997 10 22 01 36 92 6.3 -9 664.60 -56.8 -56.2 -56.0 64 -99 SPO 1997 10 22 01 37 93 6.4 -9 664.60 -56.8 -56.2 -56.0 64 -99 SPO 1997 10 22 01 38 94 6.3 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 39 95 6.3 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 40 95 6.2 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 41 97 6.3 -9 664.60 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 42 96 6.1 -9 664.60 -56.7 -56.1 -56.0 63 -99 SPO 1997 10 22 01 43 96 6.1 -9 664.70 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 44 96 6.1 -9 664.70 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 45 96 6.0 -9 664.70 -56.8 -56.1 -56.0 64 -99 SPO 1997 10 22 01 46 97 6.1 -9 664.70 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 47 96 5.8 -9 664.70 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 48 96 5.8 -9 664.70 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 49 96 5.7 -9 664.70 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 50 96 5.7 -9 664.70 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 51 96 5.8 -9 664.70 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 52 96 5.8 -9 664.80 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 01 53 95 5.7 -9 664.80 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 54 96 5.9 -9 664.70 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 55 96 5.6 -9 664.80 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 01 56 97 5.6 -9 664.80 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 01 57 98 5.4 -9 664.80 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 01 58 98 5.6 -9 664.80 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 01 59 99 5.4 -9 664.80 -56.8 -56.1 -55.9 63 -99 SPO 1997 10 22 02 00 99 5.7 -9 664.80 -56.8 -56.1 -55.9 63 0 SPO 1997 10 22 02 01 98 5.7 -9 664.80 -56.9 -56.1 -55.9 63 -99 SPO 1997 10 22 02 02 97 5.6 -9 664.80 -56.8 -56.1 -55.9 62 -99 SPO 1997 10 22 02 03 96 5.7 -9 664.80 -56.9 -56.2 -55.9 63 -99 SPO 1997 10 22 02 04 95 5.9 -9 664.80 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 02 05 94 5.8 -9 664.80 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 02 06 94 5.8 -9 664.70 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 02 07 94 6.0 -9 664.70 -56.9 -56.1 -56.0 64 -99 SPO 1997 10 22 02 08 94 6.0 -9 664.60 -56.9 -56.1 -56.0 65 -99 SPO 1997 10 22 02 09 93 6.1 -9 664.60 -56.9 -56.0 -56.0 65 -99 SPO 1997 10 22 02 10 93 6.1 -9 664.60 -56.9 -55.9 -56.0 65 -99 SPO 1997 10 22 02 11 92 6.0 -9 664.60 -56.9 -55.9 -56.0 64 -99 SPO 1997 10 22 02 12 93 6.0 -9 664.60 -56.9 -55.9 -56.0 64 -99 SPO 1997 10 22 02 13 93 6.1 -9 664.60 -56.9 -55.9 -56.0 63 -99 SPO 1997 10 22 02 14 94 6.0 -9 664.60 -56.9 -55.9 -55.9 63 -99 SPO 1997 10 22 02 15 94 6.0 -9 664.60 -56.9 -55.9 -55.9 63 -99 SPO 1997 10 22 02 16 94 6.0 -9 664.60 -56.9 -55.9 -56.0 63 -99 SPO 1997 10 22 02 17 94 6.1 -9 664.70 -56.9 -55.9 -55.9 64 -99 SPO 1997 10 22 02 18 93 6.1 -9 664.70 -56.8 -55.9 -55.9 64 -99 SPO 1997 10 22 02 19 92 6.1 -9 664.70 -56.8 -55.9 -55.9 64 -99 SPO 1997 10 22 02 20 92 6.1 -9 664.70 -56.8 -55.8 -55.9 65 -99 SPO 1997 10 22 02 21 92 6.1 -9 664.70 -56.8 -55.8 -55.9 65 -99 SPO 1997 10 22 02 22 93 6.0 -9 664.70 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 23 94 6.0 -9 664.70 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 24 94 5.8 -9 664.70 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 25 94 5.8 -9 664.70 -56.9 -55.8 -55.9 63 -99 SPO 1997 10 22 02 26 94 5.8 -9 664.70 -56.9 -55.8 -55.9 63 -99 SPO 1997 10 22 02 27 93 5.9 -9 664.70 -56.9 -55.8 -55.9 63 -99 SPO 1997 10 22 02 28 93 6.0 -9 664.70 -56.9 -55.8 -55.9 63 -99 SPO 1997 10 22 02 29 93 6.0 -9 664.70 -57.0 -55.8 -55.9 65 -99 SPO 1997 10 22 02 30 92 5.9 -9 664.70 -56.9 -55.8 -55.9 64 -99 SPO 1997 10 22 02 31 92 5.9 -9 664.80 -56.9 -55.8 -55.9 64 -99 SPO 1997 10 22 02 32 92 6.0 -9 664.80 -56.9 -55.8 -55.9 64 -99 SPO 1997 10 22 02 33 92 5.9 -9 664.90 -56.9 -55.9 -55.9 64 -99 SPO 1997 10 22 02 34 92 5.9 -9 664.90 -56.9 -55.9 -55.9 64 -99 SPO 1997 10 22 02 35 92 6.0 -9 664.90 -56.9 -55.9 -55.9 64 -99 SPO 1997 10 22 02 36 92 5.9 -9 664.80 -56.9 -55.8 -55.9 64 -99 SPO 1997 10 22 02 37 92 6.0 -9 664.80 -56.9 -55.8 -55.9 64 -99 SPO 1997 10 22 02 38 92 6.0 -9 664.80 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 39 92 6.0 -9 664.80 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 40 92 6.0 -9 664.80 -56.8 -55.7 -55.9 64 -99 SPO 1997 10 22 02 41 92 6.1 -9 664.80 -56.8 -55.7 -55.8 64 -99 SPO 1997 10 22 02 42 92 6.2 -9 664.90 -56.8 -55.7 -55.8 64 -99 SPO 1997 10 22 02 43 93 6.1 -9 664.90 -56.8 -55.7 -55.8 64 -99 SPO 1997 10 22 02 44 94 6.0 -9 664.90 -56.8 -55.7 -55.8 65 -99 SPO 1997 10 22 02 45 94 6.1 -9 664.90 -56.8 -55.7 -55.8 65 -99 SPO 1997 10 22 02 46 95 6.2 -9 664.90 -56.8 -55.7 -55.8 64 -99 SPO 1997 10 22 02 47 96 6.2 -9 664.90 -56.8 -55.7 -55.8 64 -99 SPO 1997 10 22 02 48 97 6.1 -9 664.90 -56.8 -55.8 -55.8 64 -99 SPO 1997 10 22 02 49 98 5.9 -9 665.00 -56.8 -55.8 -55.8 64 -99 SPO 1997 10 22 02 50 99 6.0 -9 665.00 -56.8 -55.8 -55.8 64 -99 SPO 1997 10 22 02 51 100 6.1 -9 665.00 -56.8 -55.8 -55.8 64 -99 SPO 1997 10 22 02 52 100 5.8 -9 665.00 -56.7 -55.9 -55.8 64 -99 SPO 1997 10 22 02 53 101 5.9 -9 665.00 -56.8 -55.9 -55.9 64 -99 SPO 1997 10 22 02 54 100 5.9 -9 665.00 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 55 99 6.0 -9 665.00 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 56 100 6.2 -9 665.00 -56.8 -55.8 -55.9 64 -99 SPO 1997 10 22 02 57 100 6.4 -9 665.00 -56.8 -55.7 -55.9 64 -99 SPO 1997 10 22 02 58 100 6.5 -9 665.00 -56.8 -55.7 -55.9 64 -99 SPO 1997 10 22 02 59 100 6.6 -9 665.00 -56.8 -55.7 -55.9 64 -99 SPO 1997 10 22 03 00 101 6.7 -9 665.00 -56.8 -55.7 -55.9 64 0 SPO 1997 10 22 03 01 101 6.8 -9 665.00 -56.7 -55.6 -56.0 63 -99 SPO 1997 10 22 03 02 102 6.8 -9 665.00 -56.7 -55.6 -56.0 63 -99 SPO 1997 10 22 03 03 102 7.1 -9 665.00 -56.7 -55.7 -56.0 64 -99 SPO 1997 10 22 03 04 103 6.8 -9 665.00 -56.7 -55.6 -56.0 64 -99 SPO 1997 10 22 03 05 103 6.9 -9 665.00 -56.7 -55.6 -56.0 64 -99 SPO 1997 10 22 03 06 103 6.9 -9 665.00 -56.6 -55.7 -56.0 64 -99 SPO 1997 10 22 03 07 103 7.0 -9 665.00 -56.6 -55.7 -56.0 64 -99 SPO 1997 10 22 03 08 104 7.1 -9 665.00 -56.6 -55.6 -56.0 64 -99 SPO 1997 10 22 03 09 105 7.2 -9 665.00 -56.6 -55.6 -56.0 65 -99 SPO 1997 10 22 03 10 105 7.1 -9 665.00 -56.7 -55.6 -56.1 66 -99 SPO 1997 10 22 03 11 106 7.0 -9 665.10 -56.7 -55.6 -56.1 66 -99 SPO 1997 10 22 03 12 106 7.0 -9 665.10 -56.8 -55.6 -56.2 66 -99 SPO 1997 10 22 03 13 106 6.9 -9 665.10 -56.8 -55.6 -56.2 65 -99 SPO 1997 10 22 03 14 106 7.0 -9 665.10 -56.8 -55.6 -56.2 65 -99 SPO 1997 10 22 03 15 106 7.2 -9 665.10 -56.8 -55.6 -56.2 64 -99 SPO 1997 10 22 03 16 105 7.2 -9 665.10 -56.8 -55.6 -56.2 64 -99 SPO 1997 10 22 03 17 103 7.1 -9 665.10 -56.8 -55.6 -56.1 64 -99 SPO 1997 10 22 03 18 103 7.1 -9 665.10 -56.8 -55.7 -56.1 64 -99 SPO 1997 10 22 03 19 103 7.1 -9 665.10 -56.8 -55.7 -56.1 64 -99 SPO 1997 10 22 03 20 102 6.9 -9 665.10 -56.7 -55.7 -56.0 64 -99 SPO 1997 10 22 03 21 101 6.7 -9 665.20 -56.8 -55.7 -56.0 64 -99 SPO 1997 10 22 03 22 101 6.9 -9 665.20 -56.7 -55.7 -56.0 63 -99 SPO 1997 10 22 03 23 102 6.8 -9 665.20 -56.7 -55.7 -56.0 63 -99 SPO 1997 10 22 03 24 102 6.7 -9 665.20 -56.7 -55.7 -56.0 62 -99 SPO 1997 10 22 03 25 102 6.6 -9 665.20 -56.7 -55.6 -56.0 62 -99 SPO 1997 10 22 03 26 102 6.7 -9 665.20 -56.7 -55.6 -55.9 63 -99 SPO 1997 10 22 03 27 102 6.8 -9 665.20 -56.7 -55.7 -55.9 64 -99 SPO 1997 10 22 03 28 102 6.7 -9 665.20 -56.6 -55.7 -55.9 63 -99 SPO 1997 10 22 03 29 101 7.0 -9 665.20 -56.6 -55.6 -55.9 64 -99 SPO 1997 10 22 03 30 101 7.0 -9 665.20 -56.6 -55.6 -55.9 64 -99 SPO 1997 10 22 03 31 102 7.2 -9 665.20 -56.5 -55.5 -55.8 64 -99 SPO 1997 10 22 03 32 102 7.3 -9 665.20 -56.5 -55.5 -55.8 64 -99 SPO 1997 10 22 03 33 102 7.2 -9 665.20 -56.5 -55.6 -55.8 64 -99 SPO 1997 10 22 03 34 102 7.1 -9 665.20 -56.5 -55.6 -55.8 65 -99 SPO 1997 10 22 03 35 102 7.1 -9 665.20 -56.5 -55.6 -55.8 65 -99 SPO 1997 10 22 03 36 102 7.2 -9 665.20 -56.5 -55.5 -55.8 65 -99 SPO 1997 10 22 03 37 101 7.2 -9 665.20 -56.5 -55.5 -55.8 64 -99 SPO 1997 10 22 03 38 101 6.9 -9 665.20 -56.5 -55.5 -55.8 64 -99 SPO 1997 10 22 03 39 102 6.9 -9 665.20 -56.5 -55.6 -55.8 65 -99 SPO 1997 10 22 03 40 102 6.8 -9 665.20 -56.5 -55.5 -55.8 65 -99 SPO 1997 10 22 03 41 103 6.9 -9 665.20 -56.5 -55.5 -55.8 64 -99 SPO 1997 10 22 03 42 104 6.9 -9 665.30 -56.5 -55.5 -55.9 64 -99 SPO 1997 10 22 03 43 106 7.0 -9 665.30 -56.5 -55.5 -55.9 64 -99 SPO 1997 10 22 03 44 107 7.2 -9 665.30 -56.5 -55.5 -55.9 64 -99 SPO 1997 10 22 03 45 108 7.3 -9 665.30 -56.5 -55.4 -56.0 64 -99 SPO 1997 10 22 03 46 108 7.2 -9 665.30 -56.4 -55.5 -56.0 63 -99 SPO 1997 10 22 03 47 107 7.5 -9 665.30 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 03 48 107 7.4 -9 665.30 -56.4 -55.5 -56.0 65 -99 SPO 1997 10 22 03 49 106 7.1 -9 665.30 -56.4 -55.5 -55.9 65 -99 SPO 1997 10 22 03 50 105 7.0 -9 665.30 -56.5 -55.5 -55.8 66 -99 SPO 1997 10 22 03 51 105 6.7 -9 665.30 -56.4 -55.5 -55.8 65 -99 SPO 1997 10 22 03 52 105 6.7 -9 665.30 -56.5 -55.5 -55.8 66 -99 SPO 1997 10 22 03 53 105 6.7 -9 665.30 -56.5 -55.5 -55.8 65 -99 SPO 1997 10 22 03 54 104 6.2 -9 665.30 -56.4 -55.5 -55.7 64 -99 SPO 1997 10 22 03 55 104 6.0 -9 665.30 -56.5 -55.5 -55.7 64 -99 SPO 1997 10 22 03 56 102 5.7 -9 665.30 -56.5 -55.6 -55.7 64 -99 SPO 1997 10 22 03 57 102 5.8 -9 665.40 -56.5 -55.6 -55.6 64 -99 SPO 1997 10 22 03 58 102 6.0 -9 665.40 -56.5 -55.6 -55.6 64 -99 SPO 1997 10 22 03 59 101 5.8 -9 665.40 -56.4 -55.6 -55.6 62 -99 SPO 1997 10 22 04 00 102 5.7 -9 665.40 -56.5 -55.6 -55.6 62 0 SPO 1997 10 22 04 01 101 5.7 -9 665.40 -56.5 -55.7 -55.6 62 -99 SPO 1997 10 22 04 02 101 5.6 -9 665.40 -56.5 -55.7 -55.6 63 -99 SPO 1997 10 22 04 03 101 5.5 -9 665.40 -56.5 -55.8 -55.6 63 -99 SPO 1997 10 22 04 04 101 5.6 -9 665.40 -56.6 -55.7 -55.6 64 -99 SPO 1997 10 22 04 05 102 5.7 -9 665.40 -56.6 -55.7 -55.6 64 -99 SPO 1997 10 22 04 06 102 5.6 -9 665.40 -56.5 -55.7 -55.6 64 -99 SPO 1997 10 22 04 07 104 5.4 -9 665.50 -56.5 -55.8 -55.6 64 -99 SPO 1997 10 22 04 08 106 5.7 -9 665.50 -56.5 -55.8 -55.7 64 -99 SPO 1997 10 22 04 09 109 5.8 -9 665.50 -56.5 -55.7 -55.8 63 -99 SPO 1997 10 22 04 10 110 5.9 -9 665.50 -56.5 -55.6 -55.8 62 -99 SPO 1997 10 22 04 11 110 5.9 -9 665.50 -56.5 -55.6 -55.8 62 -99 SPO 1997 10 22 04 12 111 6.0 -9 665.50 -56.5 -55.6 -55.8 62 -99 SPO 1997 10 22 04 13 110 6.2 -9 665.50 -56.4 -55.6 -55.8 61 -99 SPO 1997 10 22 04 14 110 6.2 -9 665.50 -56.4 -55.6 -55.8 61 -99 SPO 1997 10 22 04 15 110 6.3 -9 665.50 -56.4 -55.6 -55.8 62 -99 SPO 1997 10 22 04 16 110 6.3 -9 665.50 -56.4 -55.6 -55.8 63 -99 SPO 1997 10 22 04 17 111 6.3 -9 665.50 -56.4 -55.6 -55.8 64 -99 SPO 1997 10 22 04 18 111 6.3 -9 665.50 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 22 04 19 111 6.3 -9 665.50 -56.4 -55.7 -55.8 64 -99 SPO 1997 10 22 04 20 112 6.1 -9 665.50 -56.3 -55.7 -55.8 64 -99 SPO 1997 10 22 04 21 110 6.0 -9 665.50 -56.3 -55.7 -55.7 64 -99 SPO 1997 10 22 04 22 109 6.1 -9 665.60 -56.3 -55.7 -55.7 64 -99 SPO 1997 10 22 04 23 109 6.3 -9 665.60 -56.3 -55.6 -55.6 63 -99 SPO 1997 10 22 04 24 109 6.2 -9 665.60 -56.2 -55.6 -55.6 62 -99 SPO 1997 10 22 04 25 109 6.1 -9 665.60 -56.2 -55.6 -55.6 62 -99 SPO 1997 10 22 04 26 109 5.8 -9 665.60 -56.2 -55.6 -55.6 62 -99 SPO 1997 10 22 04 27 109 6.0 -9 665.70 -56.2 -55.7 -55.6 63 -99 SPO 1997 10 22 04 28 110 5.8 -9 665.70 -56.2 -55.7 -55.6 64 -99 SPO 1997 10 22 04 29 112 5.8 -9 665.70 -56.2 -55.6 -55.7 63 -99 SPO 1997 10 22 04 30 114 5.7 -9 665.70 -56.3 -55.7 -55.8 64 -99 SPO 1997 10 22 04 31 114 5.6 -9 665.70 -56.3 -55.7 -55.8 64 -99 SPO 1997 10 22 04 32 115 5.4 -9 665.70 -56.3 -55.7 -55.8 64 -99 SPO 1997 10 22 04 33 115 5.4 -9 665.70 -56.3 -55.7 -55.9 64 -99 SPO 1997 10 22 04 34 115 5.3 -9 665.80 -56.3 -55.7 -55.9 64 -99 SPO 1997 10 22 04 35 115 5.5 -9 665.80 -56.4 -55.7 -55.9 64 -99 SPO 1997 10 22 04 36 115 5.5 -9 665.80 -56.4 -55.7 -55.9 64 -99 SPO 1997 10 22 04 37 115 5.5 -9 665.80 -56.4 -55.6 -56.0 64 -99 SPO 1997 10 22 04 38 115 5.3 -9 665.80 -56.4 -55.6 -56.0 64 -99 SPO 1997 10 22 04 39 112 5.5 -9 665.80 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 04 40 111 5.7 -9 665.70 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 04 41 111 5.6 -9 665.70 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 04 42 111 5.8 -9 665.80 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 04 43 111 5.7 -9 665.80 -56.4 -55.5 -56.0 64 -99 SPO 1997 10 22 04 44 110 5.8 -9 665.80 -56.4 -55.5 -56.0 64 -99 SPO 1997 10 22 04 45 110 5.5 -9 665.80 -56.4 -55.5 -56.0 63 -99 SPO 1997 10 22 04 46 111 5.6 -9 665.80 -56.5 -55.6 -56.0 64 -99 SPO 1997 10 22 04 47 109 6.0 -9 665.80 -56.5 -55.6 -56.1 63 -99 SPO 1997 10 22 04 48 109 5.9 -9 665.80 -56.5 -55.5 -56.0 63 -99 SPO 1997 10 22 04 49 107 5.9 -9 665.80 -56.4 -55.5 -56.0 62 -99 SPO 1997 10 22 04 50 105 6.0 -9 665.80 -56.4 -55.5 -55.9 62 -99 SPO 1997 10 22 04 51 104 5.9 -9 665.80 -56.4 -55.4 -55.8 63 -99 SPO 1997 10 22 04 52 103 6.0 -9 665.80 -56.3 -55.4 -55.8 63 -99 SPO 1997 10 22 04 53 104 6.0 -9 665.80 -56.3 -55.3 -55.8 63 -99 SPO 1997 10 22 04 54 104 6.1 -9 665.80 -56.3 -55.3 -55.9 64 -99 SPO 1997 10 22 04 55 105 6.1 -9 665.80 -56.3 -55.2 -55.9 64 -99 SPO 1997 10 22 04 56 104 6.3 -9 665.80 -56.3 -55.2 -55.8 64 -99 SPO 1997 10 22 04 57 104 6.2 -9 665.80 -56.2 -55.2 -55.8 64 -99 SPO 1997 10 22 04 58 103 6.6 -9 665.80 -56.2 -55.1 -55.8 64 -99 SPO 1997 10 22 04 59 103 6.4 -9 665.80 -56.2 -55.2 -55.8 63 -99 SPO 1997 10 22 05 00 103 6.5 -9 665.80 -56.1 -55.2 -55.8 63 0 SPO 1997 10 22 05 01 103 6.4 -9 665.80 -56.1 -55.2 -55.8 63 -99 SPO 1997 10 22 05 02 104 6.3 -9 665.90 -56.2 -55.3 -55.8 64 -99 SPO 1997 10 22 05 03 104 6.3 -9 665.90 -56.2 -55.3 -55.8 64 -99 SPO 1997 10 22 05 04 105 6.2 -9 665.90 -56.3 -55.2 -55.8 65 -99 SPO 1997 10 22 05 05 106 6.0 -9 665.90 -56.3 -55.3 -55.9 65 -99 SPO 1997 10 22 05 06 107 5.8 -9 665.90 -56.4 -55.3 -55.9 66 -99 SPO 1997 10 22 05 07 108 5.7 -9 666.00 -56.4 -55.3 -56.0 66 -99 SPO 1997 10 22 05 08 110 5.4 -9 666.00 -56.5 -55.4 -56.0 66 -99 SPO 1997 10 22 05 09 114 5.1 -9 666.00 -56.6 -55.4 -56.2 67 -99 SPO 1997 10 22 05 10 116 4.9 -9 666.10 -56.7 -55.5 -56.3 67 -99 SPO 1997 10 22 05 11 118 4.7 -9 666.10 -56.8 -55.6 -56.4 66 -99 SPO 1997 10 22 05 12 117 5.0 -9 666.10 -56.9 -55.6 -56.5 65 -99 SPO 1997 10 22 05 13 118 5.2 -9 666.10 -56.9 -55.6 -56.6 64 -99 SPO 1997 10 22 05 14 119 5.3 -9 666.10 -56.9 -55.6 -56.6 63 -99 SPO 1997 10 22 05 15 121 5.2 -9 666.10 -56.9 -55.6 -56.6 63 -99 SPO 1997 10 22 05 16 121 5.2 -9 666.20 -56.9 -55.7 -56.6 63 -99 SPO 1997 10 22 05 17 122 5.2 -9 666.20 -56.9 -55.8 -56.6 63 -99 SPO 1997 10 22 05 18 122 5.5 -9 666.20 -56.8 -55.7 -56.6 63 -99 SPO 1997 10 22 05 19 120 5.6 -9 666.20 -56.8 -55.6 -56.6 63 -99 SPO 1997 10 22 05 20 118 5.6 -9 666.20 -56.8 -55.6 -56.6 63 -99 SPO 1997 10 22 05 21 118 5.7 -9 666.20 -56.8 -55.6 -56.6 63 -99 SPO 1997 10 22 05 22 118 5.8 -9 666.20 -56.8 -55.5 -56.5 64 -99 SPO 1997 10 22 05 23 117 5.8 -9 666.20 -56.8 -55.5 -56.5 64 -99 SPO 1997 10 22 05 24 117 5.9 -9 666.20 -56.7 -55.5 -56.5 63 -99 SPO 1997 10 22 05 25 117 5.7 -9 666.20 -56.8 -55.4 -56.5 64 -99 SPO 1997 10 22 05 26 117 5.7 -9 666.20 -56.7 -55.4 -56.5 63 -99 SPO 1997 10 22 05 27 116 5.8 -9 666.20 -56.7 -55.5 -56.5 63 -99 SPO 1997 10 22 05 28 116 5.7 -9 666.20 -56.7 -55.5 -56.5 63 -99 SPO 1997 10 22 05 29 115 5.7 -9 666.20 -56.7 -55.5 -56.5 63 -99 SPO 1997 10 22 05 30 114 5.7 -9 666.20 -56.8 -55.5 -56.5 64 -99 SPO 1997 10 22 05 31 113 5.7 -9 666.20 -56.8 -55.5 -56.5 64 -99 SPO 1997 10 22 05 32 114 5.7 -9 666.20 -56.7 -55.6 -56.4 64 -99 SPO 1997 10 22 05 33 113 5.8 -9 666.20 -56.8 -55.6 -56.4 64 -99 SPO 1997 10 22 05 34 113 5.8 -9 666.30 -56.8 -55.5 -56.4 64 -99 SPO 1997 10 22 05 35 114 5.9 -9 666.30 -56.7 -55.5 -56.4 63 -99 SPO 1997 10 22 05 36 113 6.0 -9 666.30 -56.7 -55.5 -56.4 63 -99 SPO 1997 10 22 05 37 113 6.0 -9 666.30 -56.7 -55.5 -56.4 63 -99 SPO 1997 10 22 05 38 113 6.0 -9 666.30 -56.7 -55.5 -56.4 62 -99 SPO 1997 10 22 05 39 111 6.2 -9 666.30 -56.6 -55.5 -56.3 62 -99 SPO 1997 10 22 05 40 111 6.2 -9 666.30 -56.6 -55.4 -56.3 63 -99 SPO 1997 10 22 05 41 111 6.2 -9 666.30 -56.6 -55.4 -56.2 64 -99 SPO 1997 10 22 05 42 110 6.2 -9 666.30 -56.6 -55.4 -56.2 64 -99 SPO 1997 10 22 05 43 109 6.2 -9 666.30 -56.6 -55.4 -56.2 64 -99 SPO 1997 10 22 05 44 108 6.1 -9 666.30 -56.5 -55.4 -56.1 64 -99 SPO 1997 10 22 05 45 108 6.1 -9 666.30 -56.4 -55.4 -56.0 63 -99 SPO 1997 10 22 05 46 108 6.1 -9 666.30 -56.4 -55.4 -56.0 63 -99 SPO 1997 10 22 05 47 108 6.0 -9 666.30 -56.4 -55.4 -56.0 63 -99 SPO 1997 10 22 05 48 108 6.0 -9 666.30 -56.4 -55.4 -56.0 63 -99 SPO 1997 10 22 05 49 108 5.9 -9 666.30 -56.4 -55.5 -56.0 62 -99 SPO 1997 10 22 05 50 108 5.8 -9 666.30 -56.4 -55.5 -56.0 62 -99 SPO 1997 10 22 05 51 108 6.0 -9 666.30 -56.4 -55.5 -56.0 63 -99 SPO 1997 10 22 05 52 109 5.9 -9 666.30 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 05 53 108 5.8 -9 666.30 -56.4 -55.6 -56.0 64 -99 SPO 1997 10 22 05 54 108 5.9 -9 666.30 -56.4 -55.6 -55.9 64 -99 SPO 1997 10 22 05 55 108 5.9 -9 666.40 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 05 56 107 6.0 -9 666.40 -56.4 -55.5 -55.9 64 -99 SPO 1997 10 22 05 57 107 6.0 -9 666.40 -56.4 -55.5 -55.8 64 -99 SPO 1997 10 22 05 58 107 5.9 -9 666.40 -56.4 -55.5 -55.8 64 -99 SPO 1997 10 22 05 59 106 5.8 -9 666.40 -56.4 -55.5 -55.8 64 -99 SPO 1997 10 22 06 00 106 5.8 -9 666.40 -56.4 -55.4 -55.8 64 0 SPO 1997 10 22 06 01 104 5.9 -9 666.40 -56.3 -55.4 -55.8 62 -99 SPO 1997 10 22 06 02 105 6.0 -9 666.40 -56.4 -55.4 -55.7 63 -99 SPO 1997 10 22 06 03 104 5.8 -9 666.40 -56.3 -55.4 -55.7 62 -99 SPO 1997 10 22 06 04 104 5.9 -9 666.40 -56.3 -55.4 -55.7 63 -99 SPO 1997 10 22 06 05 104 6.0 -9 666.40 -56.3 -55.4 -55.6 63 -99 SPO 1997 10 22 06 06 104 6.0 -9 666.40 -56.4 -55.4 -55.6 64 -99 SPO 1997 10 22 06 07 102 6.2 -9 666.40 -56.3 -55.4 -55.6 64 -99 SPO 1997 10 22 06 08 100 6.0 -9 666.40 -56.3 -55.3 -55.6 64 -99 SPO 1997 10 22 06 09 101 6.2 -9 666.40 -56.3 -55.3 -55.5 64 -99 SPO 1997 10 22 06 10 99 6.1 -9 666.40 -56.2 -55.3 -55.5 64 -99 SPO 1997 10 22 06 11 98 6.2 -9 666.40 -56.2 -55.2 -55.5 64 -99 SPO 1997 10 22 06 12 99 6.1 -9 666.40 -56.2 -55.2 -55.5 64 -99 SPO 1997 10 22 06 13 100 6.1 -9 666.40 -56.2 -55.2 -55.5 64 -99 SPO 1997 10 22 06 14 99 6.0 -9 666.40 -56.2 -55.3 -55.5 63 -99 SPO 1997 10 22 06 15 99 6.0 -9 666.40 -56.3 -55.3 -55.5 63 -99 SPO 1997 10 22 06 16 97 6.2 -9 666.40 -56.3 -55.3 -55.5 63 -99 SPO 1997 10 22 06 17 95 6.2 -9 666.40 -56.3 -55.3 -55.5 64 -99 SPO 1997 10 22 06 18 95 6.1 -9 666.40 -56.3 -55.3 -55.5 64 -99 SPO 1997 10 22 06 19 95 6.1 -9 666.40 -56.2 -55.3 -55.5 64 -99 SPO 1997 10 22 06 20 95 6.2 -9 666.40 -56.2 -55.3 -55.5 64 -99 SPO 1997 10 22 06 21 95 6.2 -9 666.40 -56.2 -55.2 -55.4 64 -99 SPO 1997 10 22 06 22 95 6.2 -9 666.40 -56.2 -55.2 -55.4 64 -99 SPO 1997 10 22 06 23 94 6.4 -9 666.40 -56.2 -55.2 -55.4 64 -99 SPO 1997 10 22 06 24 94 6.4 -9 666.40 -56.1 -55.2 -55.4 63 -99 SPO 1997 10 22 06 25 93 6.3 -9 666.40 -56.1 -55.2 -55.4 63 -99 SPO 1997 10 22 06 26 92 6.3 -9 666.40 -56.1 -55.2 -55.3 63 -99 SPO 1997 10 22 06 27 93 6.3 -9 666.50 -56.0 -55.1 -55.3 62 -99 SPO 1997 10 22 06 28 94 6.2 -9 666.50 -56.0 -55.1 -55.3 63 -99 SPO 1997 10 22 06 29 95 6.1 -9 666.50 -56.1 -55.1 -55.3 64 -99 SPO 1997 10 22 06 30 96 5.8 -9 666.50 -56.1 -55.2 -55.3 64 -99 SPO 1997 10 22 06 31 98 5.8 -9 666.50 -56.1 -55.2 -55.3 64 -99 SPO 1997 10 22 06 32 101 5.4 -9 666.60 -56.1 -55.3 -55.3 64 -99 SPO 1997 10 22 06 33 102 5.4 -9 666.60 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 06 34 104 5.1 -9 666.60 -56.2 -55.4 -55.4 64 -99 SPO 1997 10 22 06 35 106 5.0 -9 666.70 -56.3 -55.4 -55.4 65 -99 SPO 1997 10 22 06 36 107 5.0 -9 666.70 -56.3 -55.5 -55.5 64 -99 SPO 1997 10 22 06 37 108 5.0 -9 666.70 -56.4 -55.5 -55.5 64 -99 SPO 1997 10 22 06 38 109 4.9 -9 666.70 -56.4 -55.5 -55.6 64 -99 SPO 1997 10 22 06 39 110 4.9 -9 666.70 -56.4 -55.5 -55.6 63 -99 SPO 1997 10 22 06 40 112 4.8 -9 666.80 -56.4 -55.5 -55.6 62 -99 SPO 1997 10 22 06 41 113 4.8 -9 666.80 -56.4 -55.5 -55.7 62 -99 SPO 1997 10 22 06 42 114 4.8 -9 666.80 -56.4 -55.5 -55.8 62 -99 SPO 1997 10 22 06 43 115 4.8 -9 666.80 -56.4 -55.5 -55.8 62 -99 SPO 1997 10 22 06 44 116 4.7 -9 666.80 -56.4 -55.6 -55.8 62 -99 SPO 1997 10 22 06 45 116 4.7 -9 666.80 -56.4 -55.5 -55.8 62 -99 SPO 1997 10 22 06 46 113 4.8 -9 666.80 -56.5 -55.5 -55.8 63 -99 SPO 1997 10 22 06 47 112 4.9 -9 666.80 -56.5 -55.5 -55.7 63 -99 SPO 1997 10 22 06 48 110 4.9 -9 666.80 -56.5 -55.6 -55.6 63 -99 SPO 1997 10 22 06 49 110 4.9 -9 666.80 -56.5 -55.6 -55.6 63 -99 SPO 1997 10 22 06 50 109 4.8 -9 666.80 -56.5 -55.6 -55.6 62 -99 SPO 1997 10 22 06 51 110 4.8 -9 666.80 -56.5 -55.7 -55.6 62 -99 SPO 1997 10 22 06 52 111 4.9 -9 666.80 -56.5 -55.7 -55.7 62 -99 SPO 1997 10 22 06 53 112 4.7 -9 666.80 -56.5 -55.8 -55.8 62 -99 SPO 1997 10 22 06 54 112 4.7 -9 666.80 -56.6 -55.8 -55.8 63 -99 SPO 1997 10 22 06 55 110 4.7 -9 666.80 -56.6 -55.8 -55.7 63 -99 SPO 1997 10 22 06 56 110 4.9 -9 666.80 -56.7 -55.7 -55.8 64 -99 SPO 1997 10 22 06 57 109 4.8 -9 666.90 -56.6 -55.7 -55.7 63 -99 SPO 1997 10 22 06 58 110 5.0 -9 666.90 -56.6 -55.7 -55.7 64 -99 SPO 1997 10 22 06 59 109 4.9 -9 666.90 -56.6 -55.7 -55.7 64 -99 SPO 1997 10 22 07 00 109 4.9 -9 666.90 -56.6 -55.7 -55.7 64 0 SPO 1997 10 22 07 01 107 4.9 -9 666.90 -56.6 -55.7 -55.6 64 -99 SPO 1997 10 22 07 02 105 5.0 -9 666.90 -56.6 -55.7 -55.6 64 -99 SPO 1997 10 22 07 03 103 5.2 -9 666.90 -56.6 -55.7 -55.5 63 -99 SPO 1997 10 22 07 04 102 5.3 -9 666.90 -56.6 -55.7 -55.5 63 -99 SPO 1997 10 22 07 05 100 5.4 -9 666.90 -56.6 -55.6 -55.4 63 -99 SPO 1997 10 22 07 06 101 5.5 -9 666.90 -56.5 -55.6 -55.4 62 -99 SPO 1997 10 22 07 07 99 5.5 -9 666.90 -56.4 -55.6 -55.4 62 -99 SPO 1997 10 22 07 08 98 5.4 -9 666.90 -56.4 -55.6 -55.4 63 -99 SPO 1997 10 22 07 09 98 5.6 -9 666.90 -56.4 -55.6 -55.4 63 -99 SPO 1997 10 22 07 10 98 5.4 -9 666.90 -56.4 -55.5 -55.3 64 -99 SPO 1997 10 22 07 11 98 5.6 -9 666.90 -56.4 -55.5 -55.3 64 -99 SPO 1997 10 22 07 12 99 5.1 -9 666.90 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 22 07 13 103 5.3 -9 667.00 -56.4 -55.5 -55.3 65 -99 SPO 1997 10 22 07 14 106 5.2 -9 667.00 -56.3 -55.5 -55.3 64 -99 SPO 1997 10 22 07 15 108 5.1 -9 667.00 -56.3 -55.5 -55.4 63 -99 SPO 1997 10 22 07 16 109 5.3 -9 667.00 -56.3 -55.5 -55.5 63 -99 SPO 1997 10 22 07 17 108 5.4 -9 667.00 -56.3 -55.4 -55.5 63 -99 SPO 1997 10 22 07 18 107 5.3 -9 667.00 -56.3 -55.4 -55.5 63 -99 SPO 1997 10 22 07 19 107 5.5 -9 667.00 -56.3 -55.4 -55.4 63 -99 SPO 1997 10 22 07 20 109 5.3 -9 667.10 -56.4 -55.5 -55.4 64 -99 SPO 1997 10 22 07 21 110 5.3 -9 667.10 -56.4 -55.5 -55.6 64 -99 SPO 1997 10 22 07 22 111 5.2 -9 667.10 -56.4 -55.5 -55.6 64 -99 SPO 1997 10 22 07 23 112 5.2 -9 667.10 -56.4 -55.6 -55.6 64 -99 SPO 1997 10 22 07 24 112 5.2 -9 667.10 -56.4 -55.5 -55.6 64 -99 SPO 1997 10 22 07 25 115 4.9 -9 667.10 -56.4 -55.5 -55.7 64 -99 SPO 1997 10 22 07 26 117 4.9 -9 667.20 -56.4 -55.6 -55.7 64 -99 SPO 1997 10 22 07 27 116 5.1 -9 667.20 -56.4 -55.6 -55.7 63 -99 SPO 1997 10 22 07 28 115 5.2 -9 667.20 -56.3 -55.5 -55.7 62 -99 SPO 1997 10 22 07 29 111 5.5 -9 667.20 -56.3 -55.4 -55.6 62 -99 SPO 1997 10 22 07 30 110 5.5 -9 667.10 -56.2 -55.4 -55.4 61 -99 SPO 1997 10 22 07 31 110 5.5 -9 667.10 -56.2 -55.4 -55.4 63 -99 SPO 1997 10 22 07 32 110 5.6 -9 667.10 -56.2 -55.4 -55.4 64 -99 SPO 1997 10 22 07 33 109 5.6 -9 667.10 -56.1 -55.4 -55.4 63 -99 SPO 1997 10 22 07 34 108 5.8 -9 667.10 -56.2 -55.4 -55.4 64 -99 SPO 1997 10 22 07 35 108 5.6 -9 667.10 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 07 36 108 5.7 -9 667.10 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 07 37 107 5.9 -9 667.10 -56.2 -55.4 -55.4 64 -99 SPO 1997 10 22 07 38 106 5.9 -9 667.10 -56.2 -55.4 -55.4 64 -99 SPO 1997 10 22 07 39 104 5.7 -9 667.10 -56.3 -55.4 -55.3 64 -99 SPO 1997 10 22 07 40 103 5.9 -9 667.10 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 07 41 101 5.9 -9 667.10 -56.3 -55.4 -55.3 64 -99 SPO 1997 10 22 07 42 100 5.8 -9 667.10 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 07 43 98 6.0 -9 667.10 -56.3 -55.4 -55.2 64 -99 SPO 1997 10 22 07 44 96 6.1 -9 667.10 -56.2 -55.4 -55.3 64 -99 SPO 1997 10 22 07 45 96 6.0 -9 667.10 -56.2 -55.3 -55.3 64 -99 SPO 1997 10 22 07 46 97 5.7 -9 667.10 -56.3 -55.3 -55.3 65 -99 SPO 1997 10 22 07 47 99 5.8 -9 667.10 -56.3 -55.3 -55.3 65 -99 SPO 1997 10 22 07 48 101 5.7 -9 667.10 -56.3 -55.3 -55.3 65 -99 SPO 1997 10 22 07 49 102 5.7 -9 667.10 -56.3 -55.3 -55.3 64 -99 SPO 1997 10 22 07 50 102 5.8 -9 667.10 -56.3 -55.3 -55.4 64 -99 SPO 1997 10 22 07 51 100 5.6 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 07 52 99 5.7 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 07 53 97 5.9 -9 667.10 -56.3 -55.4 -55.3 63 -99 SPO 1997 10 22 07 54 97 5.9 -9 667.10 -56.3 -55.4 -55.3 63 -99 SPO 1997 10 22 07 55 96 5.8 -9 667.10 -56.3 -55.4 -55.3 63 -99 SPO 1997 10 22 07 56 96 5.8 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 07 57 96 5.8 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 07 58 96 5.8 -9 667.10 -56.4 -55.4 -55.4 64 -99 SPO 1997 10 22 07 59 96 5.7 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 08 00 97 5.7 -9 667.10 -56.4 -55.4 -55.3 64 0 SPO 1997 10 22 08 01 98 5.7 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 08 02 96 5.7 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 08 03 94 5.6 -9 667.10 -56.4 -55.4 -55.3 64 -99 SPO 1997 10 22 08 04 95 5.7 -9 667.10 -56.3 -55.4 -55.3 63 -99 SPO 1997 10 22 08 05 95 5.7 -9 667.10 -56.3 -55.5 -55.3 62 -99 SPO 1997 10 22 08 06 93 5.8 -9 667.10 -56.3 -55.5 -55.3 62 -99 SPO 1997 10 22 08 07 94 5.7 -9 667.10 -56.3 -55.5 -55.3 62 -99 SPO 1997 10 22 08 08 93 5.6 -9 667.20 -56.2 -55.6 -55.3 62 -99 SPO 1997 10 22 08 09 93 5.7 -9 667.20 -56.2 -55.6 -55.3 64 -99 SPO 1997 10 22 08 10 93 5.6 -9 667.20 -56.3 -55.6 -55.3 64 -99 SPO 1997 10 22 08 11 92 5.7 -9 667.20 -56.3 -55.6 -55.3 64 -99 SPO 1997 10 22 08 12 91 5.7 -9 667.20 -56.2 -55.6 -55.3 64 -99 SPO 1997 10 22 08 13 91 5.4 -9 667.20 -56.2 -55.6 -55.3 64 -99 SPO 1997 10 22 08 14 92 5.6 -9 667.20 -56.2 -55.7 -55.3 64 -99 SPO 1997 10 22 08 15 93 5.4 -9 667.20 -56.3 -55.6 -55.3 64 -99 SPO 1997 10 22 08 16 93 5.6 -9 667.30 -56.3 -55.6 -55.3 64 -99 SPO 1997 10 22 08 17 94 5.4 -9 667.30 -56.3 -55.6 -55.3 64 -99 SPO 1997 10 22 08 18 95 5.3 -9 667.30 -56.3 -55.6 -55.2 64 -99 SPO 1997 10 22 08 19 97 5.2 -9 667.30 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 20 98 5.3 -9 667.30 -56.3 -55.7 -55.3 63 -99 SPO 1997 10 22 08 21 99 5.3 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 22 99 5.3 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 23 99 5.3 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 24 99 5.3 -9 667.40 -56.4 -55.8 -55.3 64 -99 SPO 1997 10 22 08 25 97 5.4 -9 667.40 -56.4 -55.8 -55.3 64 -99 SPO 1997 10 22 08 26 97 5.4 -9 667.40 -56.4 -55.8 -55.3 64 -99 SPO 1997 10 22 08 27 97 5.4 -9 667.40 -56.4 -55.8 -55.3 64 -99 SPO 1997 10 22 08 28 98 5.3 -9 667.40 -56.4 -55.8 -55.3 64 -99 SPO 1997 10 22 08 29 100 5.2 -9 667.40 -56.4 -55.8 -55.3 63 -99 SPO 1997 10 22 08 30 101 5.2 -9 667.50 -56.4 -55.8 -55.3 62 -99 SPO 1997 10 22 08 31 100 5.3 -9 667.50 -56.4 -55.7 -55.3 62 -99 SPO 1997 10 22 08 32 99 5.3 -9 667.40 -56.4 -55.7 -55.3 62 -99 SPO 1997 10 22 08 33 96 5.4 -9 667.40 -56.4 -55.7 -55.3 63 -99 SPO 1997 10 22 08 34 95 5.5 -9 667.40 -56.4 -55.7 -55.3 63 -99 SPO 1997 10 22 08 35 94 5.5 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 36 94 5.5 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 37 93 5.5 -9 667.40 -56.4 -55.6 -55.3 64 -99 SPO 1997 10 22 08 38 91 5.5 -9 667.40 -56.4 -55.6 -55.3 64 -99 SPO 1997 10 22 08 39 91 5.6 -9 667.40 -56.4 -55.6 -55.3 64 -99 SPO 1997 10 22 08 40 89 5.5 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 41 90 5.4 -9 667.40 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 08 42 86 5.7 -9 667.40 -56.4 -55.7 -55.4 64 -99 SPO 1997 10 22 08 43 85 5.7 -9 667.50 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 44 85 5.7 -9 667.40 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 45 83 5.5 -9 667.40 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 46 83 5.4 -9 667.50 -56.3 -55.6 -55.4 64 -99 SPO 1997 10 22 08 47 83 5.4 -9 667.50 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 48 83 5.3 -9 667.50 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 49 85 5.2 -9 667.50 -56.4 -55.6 -55.4 64 -99 SPO 1997 10 22 08 50 84 5.2 -9 667.50 -56.4 -55.6 -55.3 64 -99 SPO 1997 10 22 08 51 83 5.2 -9 667.50 -56.4 -55.6 -55.3 63 -99 SPO 1997 10 22 08 52 83 5.2 -9 667.50 -56.4 -55.6 -55.3 63 -99 SPO 1997 10 22 08 53 82 5.1 -9 667.50 -56.4 -55.6 -55.4 63 -99 SPO 1997 10 22 08 54 83 4.9 -9 667.60 -56.4 -55.6 -55.3 62 -99 SPO 1997 10 22 08 55 84 4.9 -9 667.60 -56.4 -55.6 -55.3 62 -99 SPO 1997 10 22 08 56 87 5.0 -9 667.60 -56.4 -55.7 -55.3 62 -99 SPO 1997 10 22 08 57 89 4.7 -9 667.60 -56.4 -55.7 -55.3 62 -99 SPO 1997 10 22 08 58 90 4.9 -9 667.60 -56.4 -55.7 -55.2 63 -99 SPO 1997 10 22 08 59 89 5.0 -9 667.70 -56.4 -55.7 -55.2 63 -99 SPO 1997 10 22 09 00 88 4.9 -9 667.70 -56.4 -55.7 -55.3 63 0 SPO 1997 10 22 09 01 88 5.1 -9 667.70 -56.4 -55.7 -55.2 63 -99 SPO 1997 10 22 09 02 87 4.9 -9 667.70 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 09 03 87 4.8 -9 667.70 -56.4 -55.7 -55.3 64 -99 SPO 1997 10 22 09 04 88 4.4 -9 667.70 -56.4 -55.7 -55.2 64 -99 SPO 1997 10 22 09 05 90 4.5 -9 667.80 -56.5 -55.7 -55.2 63 -99 SPO 1997 10 22 09 06 91 4.2 -9 667.80 -56.5 -55.7 -55.2 62 -99 SPO 1997 10 22 09 07 91 4.2 -9 667.80 -56.5 -55.8 -55.1 61 -99 SPO 1997 10 22 09 08 88 4.3 -9 667.80 -56.5 -55.7 -55.1 61 -99 SPO 1997 10 22 09 09 87 4.3 -9 667.80 -56.5 -55.7 -55.1 61 -99 SPO 1997 10 22 09 10 87 4.3 -9 667.90 -56.4 -55.7 -55.1 61 -99 SPO 1997 10 22 09 11 88 4.1 -9 667.90 -56.5 -55.7 -55.1 62 -99 SPO 1997 10 22 09 12 88 4.2 -9 667.90 -56.5 -55.7 -55.1 63 -99 SPO 1997 10 22 09 13 90 4.4 -9 667.90 -56.5 -55.7 -55.1 63 -99 SPO 1997 10 22 09 14 90 4.4 -9 667.90 -56.5 -55.7 -55.1 63 -99 SPO 1997 10 22 09 15 91 4.4 -9 667.90 -56.6 -55.7 -55.1 64 -99 SPO 1997 10 22 09 16 94 4.4 -9 668.00 -56.6 -55.7 -55.1 64 -99 SPO 1997 10 22 09 17 96 4.2 -9 668.00 -56.6 -55.7 -55.1 64 -99 SPO 1997 10 22 09 18 96 4.3 -9 668.00 -56.6 -55.7 -55.2 64 -99 SPO 1997 10 22 09 19 95 4.5 -9 668.00 -56.6 -55.7 -55.2 63 -99 SPO 1997 10 22 09 20 92 4.6 -9 668.00 -56.7 -55.6 -55.2 64 -99 SPO 1997 10 22 09 21 90 4.8 -9 668.00 -56.7 -55.6 -55.2 64 -99 SPO 1997 10 22 09 22 91 4.8 -9 668.00 -56.7 -55.6 -55.2 64 -99 SPO 1997 10 22 09 23 90 5.0 -9 667.90 -56.7 -55.6 -55.3 64 -99 SPO 1997 10 22 09 24 89 4.9 -9 667.90 -56.6 -55.6 -55.3 64 -99 SPO 1997 10 22 09 25 88 5.0 -9 667.90 -56.6 -55.6 -55.3 64 -99 SPO 1997 10 22 09 26 89 5.1 -9 667.90 -56.6 -55.6 -55.3 64 -99 SPO 1997 10 22 09 27 89 5.3 -9 667.90 -56.6 -55.6 -55.3 64 -99 SPO 1997 10 22 09 28 90 5.0 -9 667.90 -56.5 -55.6 -55.3 64 -99 SPO 1997 10 22 09 29 91 5.1 -9 668.00 -56.6 -55.7 -55.3 65 -99 SPO 1997 10 22 09 30 92 5.1 -9 668.00 -56.6 -55.7 -55.4 65 -99 SPO 1997 10 22 09 31 91 5.2 -9 668.00 -56.6 -55.7 -55.4 64 -99 SPO 1997 10 22 09 32 90 5.1 -9 668.00 -56.6 -55.8 -55.4 64 -99 SPO 1997 10 22 09 33 91 5.0 -9 668.00 -56.5 -55.8 -55.4 63 -99 SPO 1997 10 22 09 34 91 4.8 -9 668.00 -56.6 -55.8 -55.4 64 -99 SPO 1997 10 22 09 35 93 4.7 -9 668.10 -56.6 -55.8 -55.4 64 -99 SPO 1997 10 22 09 36 95 4.3 -9 668.10 -56.6 -55.8 -55.3 64 -99 SPO 1997 10 22 09 37 96 4.0 -9 668.10 -56.6 -55.9 -55.3 64 -99 SPO 1997 10 22 09 38 95 3.9 -9 668.20 -56.6 -55.9 -55.2 64 -99 SPO 1997 10 22 09 39 94 3.9 -9 668.20 -56.7 -56.0 -55.2 64 -99 SPO 1997 10 22 09 40 91 4.1 -9 668.10 -56.6 -56.0 -55.2 63 -99 SPO 1997 10 22 09 41 88 4.0 -9 668.10 -56.6 -56.0 -55.2 63 -99 SPO 1997 10 22 09 42 87 4.0 -9 668.10 -56.6 -56.0 -55.2 63 -99 SPO 1997 10 22 09 43 87 4.0 -9 668.20 -56.6 -55.9 -55.2 62 -99 SPO 1997 10 22 09 44 86 3.9 -9 668.20 -56.7 -56.0 -55.2 63 -99 SPO 1997 10 22 09 45 88 4.0 -9 668.20 -56.7 -56.0 -55.2 63 -99 SPO 1997 10 22 09 46 89 4.0 -9 668.20 -56.7 -56.0 -55.2 63 -99 SPO 1997 10 22 09 47 90 4.0 -9 668.20 -56.7 -56.0 -55.2 63 -99 SPO 1997 10 22 09 48 88 4.0 -9 668.30 -56.8 -56.0 -55.2 64 -99 SPO 1997 10 22 09 49 88 4.2 -9 668.30 -56.8 -56.0 -55.2 64 -99 SPO 1997 10 22 09 50 89 4.1 -9 668.30 -56.8 -56.0 -55.2 64 -99 SPO 1997 10 22 09 51 90 4.1 -9 668.30 -56.8 -56.0 -55.3 64 -99 SPO 1997 10 22 09 52 94 3.9 -9 668.30 -56.8 -56.0 -55.3 64 -99 SPO 1997 10 22 09 53 98 3.8 -9 668.40 -56.9 -56.0 -55.3 64 -99 SPO 1997 10 22 09 54 102 3.9 -9 668.40 -56.9 -56.0 -55.4 64 -99 SPO 1997 10 22 09 55 104 3.9 -9 668.40 -56.9 -56.0 -55.5 64 -99 SPO 1997 10 22 09 56 104 3.9 -9 668.40 -56.9 -56.0 -55.6 63 -99 SPO 1997 10 22 09 57 104 4.0 -9 668.40 -56.9 -56.0 -55.5 63 -99 SPO 1997 10 22 09 58 105 4.0 -9 668.40 -56.9 -55.9 -55.6 62 -99 SPO 1997 10 22 09 59 108 4.0 -9 668.50 -56.9 -55.9 -55.6 62 -99 SPO 1997 10 22 10 00 109 4.2 -9 668.50 -56.9 -55.9 -55.8 63 0 SPO 1997 10 22 10 01 109 4.2 -9 668.50 -56.9 -55.9 -55.8 63 -99 SPO 1997 10 22 10 02 109 4.3 -9 668.50 -56.9 -55.9 -55.8 63 -99 SPO 1997 10 22 10 03 110 4.0 -9 668.50 -57.0 -55.9 -55.9 64 -99 SPO 1997 10 22 10 04 113 3.9 -9 668.50 -57.0 -56.0 -56.0 64 -99 SPO 1997 10 22 10 05 116 3.8 -9 668.50 -57.0 -56.0 -56.1 64 -99 SPO 1997 10 22 10 06 118 3.8 -9 668.60 -57.1 -56.0 -56.2 65 -99 SPO 1997 10 22 10 07 119 3.9 -9 668.60 -57.1 -56.0 -56.2 65 -99 SPO 1997 10 22 10 08 118 4.0 -9 668.60 -57.2 -56.0 -56.3 65 -99 SPO 1997 10 22 10 09 116 4.1 -9 668.60 -57.2 -56.0 -56.3 64 -99 SPO 1997 10 22 10 10 113 4.3 -9 668.60 -57.2 -56.0 -56.3 63 -99 SPO 1997 10 22 10 11 107 4.6 -9 668.50 -57.2 -56.0 -56.1 63 -99 SPO 1997 10 22 10 12 103 4.9 -9 668.50 -57.2 -56.0 -55.9 63 -99 SPO 1997 10 22 10 13 99 5.1 -9 668.50 -57.2 -56.0 -55.8 64 -99 SPO 1997 10 22 10 14 97 5.0 -9 668.50 -57.2 -56.0 -55.8 65 -99 SPO 1997 10 22 10 15 99 4.9 -9 668.50 -57.2 -56.0 -55.8 65 -99 SPO 1997 10 22 10 16 102 4.6 -9 668.50 -57.1 -56.0 -55.8 64 -99 SPO 1997 10 22 10 17 104 4.6 -9 668.60 -57.0 -56.0 -55.8 64 -99 SPO 1997 10 22 10 18 103 4.7 -9 668.60 -57.0 -56.0 -55.9 64 -99 SPO 1997 10 22 10 19 100 5.0 -9 668.60 -57.0 -56.0 -55.8 64 -99 SPO 1997 10 22 10 20 97 5.0 -9 668.60 -57.0 -56.0 -55.8 63 -99 SPO 1997 10 22 10 21 94 5.1 -9 668.60 -57.0 -56.1 -55.8 63 -99 SPO 1997 10 22 10 22 94 4.8 -9 668.60 -57.0 -56.1 -55.8 63 -99 SPO 1997 10 22 10 23 94 4.9 -9 668.60 -57.0 -56.1 -55.8 63 -99 SPO 1997 10 22 10 24 96 4.7 -9 668.60 -57.0 -56.1 -55.8 64 -99 SPO 1997 10 22 10 25 97 4.5 -9 668.70 -57.0 -56.2 -55.8 64 -99 SPO 1997 10 22 10 26 99 4.4 -9 668.70 -57.0 -56.2 -55.7 64 -99 SPO 1997 10 22 10 27 100 4.4 -9 668.70 -57.0 -56.2 -55.8 64 -99 SPO 1997 10 22 10 28 99 4.3 -9 668.70 -57.0 -56.2 -55.8 64 -99 SPO 1997 10 22 10 29 98 4.4 -9 668.70 -57.0 -56.2 -55.7 65 -99 SPO 1997 10 22 10 30 97 4.6 -9 668.70 -57.0 -56.2 -55.7 65 -99 SPO 1997 10 22 10 31 95 4.7 -9 668.70 -57.0 -56.2 -55.8 65 -99 SPO 1997 10 22 10 32 96 4.8 -9 668.80 -57.0 -56.2 -55.8 65 -99 SPO 1997 10 22 10 33 97 4.7 -9 668.80 -56.9 -56.2 -55.8 64 -99 SPO 1997 10 22 10 34 100 4.5 -9 668.80 -57.0 -56.2 -55.8 65 -99 SPO 1997 10 22 10 35 103 4.7 -9 668.80 -57.0 -56.2 -55.8 65 -99 SPO 1997 10 22 10 36 103 4.5 -9 668.80 -57.0 -56.2 -55.8 64 -99 SPO 1997 10 22 10 37 104 4.6 -9 668.80 -56.9 -56.2 -55.9 63 -99 SPO 1997 10 22 10 38 104 4.6 -9 668.80 -57.0 -56.2 -55.9 64 -99 SPO 1997 10 22 10 39 103 4.9 -9 668.80 -57.0 -56.3 -55.9 64 -99 SPO 1997 10 22 10 40 101 5.1 -9 668.80 -57.0 -56.3 -55.9 65 -99 SPO 1997 10 22 10 41 99 5.2 -9 668.80 -56.9 -56.3 -55.9 64 -99 SPO 1997 10 22 10 42 96 5.4 -9 668.80 -57.0 -56.3 -55.9 66 -99 SPO 1997 10 22 10 43 94 5.5 -9 668.70 -57.0 -56.3 -55.9 66 -99 SPO 1997 10 22 10 44 92 5.6 -9 668.70 -56.9 -56.2 -56.0 66 -99 SPO 1997 10 22 10 45 91 5.8 -9 668.70 -56.9 -56.2 -56.0 67 -99 SPO 1997 10 22 10 46 92 5.9 -9 668.70 -56.9 -56.2 -56.0 67 -99 SPO 1997 10 22 10 47 93 6.1 -9 668.70 -56.9 -56.2 -56.0 66 -99 SPO 1997 10 22 10 48 95 5.8 -9 668.70 -56.9 -56.2 -56.0 66 -99 SPO 1997 10 22 10 49 98 5.9 -9 668.70 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 10 50 98 6.0 -9 668.70 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 10 51 98 6.2 -9 668.70 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 52 96 6.2 -9 668.70 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 53 95 6.2 -9 668.70 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 54 95 6.1 -9 668.70 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 55 97 6.3 -9 668.70 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 56 98 6.2 -9 668.80 -56.9 -56.2 -56.1 66 -99 SPO 1997 10 22 10 57 100 6.0 -9 668.80 -56.8 -56.3 -56.1 65 -99 SPO 1997 10 22 10 58 99 5.9 -9 668.80 -56.8 -56.3 -56.1 65 -99 SPO 1997 10 22 10 59 96 5.8 -9 668.80 -56.8 -56.3 -56.1 64 -99 SPO 1997 10 22 11 00 97 5.7 -9 668.80 -56.8 -56.3 -56.1 64 0 SPO 1997 10 22 11 01 98 5.5 -9 668.80 -56.8 -56.3 -56.1 64 -99 SPO 1997 10 22 11 02 98 5.3 -9 668.90 -56.8 -56.3 -56.0 64 -99 SPO 1997 10 22 11 03 97 5.2 -9 668.90 -56.9 -56.3 -56.0 64 -99 SPO 1997 10 22 11 04 97 5.5 -9 668.90 -56.9 -56.3 -56.0 64 -99 SPO 1997 10 22 11 05 96 5.7 -9 668.90 -56.8 -56.3 -56.0 64 -99 SPO 1997 10 22 11 06 96 5.6 -9 668.90 -56.8 -56.3 -56.0 64 -99 SPO 1997 10 22 11 07 96 5.6 -9 668.90 -56.8 -56.2 -56.1 64 -99 SPO 1997 10 22 11 08 98 5.5 -9 668.90 -56.9 -56.2 -56.1 65 -99 SPO 1997 10 22 11 09 99 5.6 -9 668.90 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 11 10 98 5.5 -9 668.90 -56.9 -56.2 -56.0 65 -99 SPO 1997 10 22 11 11 99 5.6 -9 668.90 -56.9 -56.2 -56.0 64 -99 SPO 1997 10 22 11 12 100 5.4 -9 668.90 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 11 13 101 5.3 -9 669.00 -56.9 -56.3 -56.0 63 -99 SPO 1997 10 22 11 14 102 5.1 -9 669.00 -56.9 -56.3 -56.0 63 -99 SPO 1997 10 22 11 15 103 5.1 -9 669.00 -56.9 -56.3 -56.1 63 -99 SPO 1997 10 22 11 16 102 5.1 -9 669.00 -56.9 -56.3 -56.0 63 -99 SPO 1997 10 22 11 17 100 4.8 -9 669.00 -56.9 -56.3 -56.0 63 -99 SPO 1997 10 22 11 18 101 4.9 -9 669.10 -56.9 -56.3 -56.0 63 -99 SPO 1997 10 22 11 19 102 4.6 -9 669.10 -57.0 -56.3 -56.0 63 -99 SPO 1997 10 22 11 20 104 4.7 -9 669.10 -57.0 -56.3 -56.0 63 -99 SPO 1997 10 22 11 21 105 4.6 -9 669.10 -57.0 -56.3 -56.1 63 -99 SPO 1997 10 22 11 22 105 5.0 -9 669.10 -57.0 -56.3 -56.1 63 -99 SPO 1997 10 22 11 23 103 4.9 -9 669.10 -57.0 -56.3 -56.1 63 -99 SPO 1997 10 22 11 24 99 5.0 -9 669.10 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 11 25 96 5.4 -9 669.10 -56.9 -56.2 -56.0 63 -99 SPO 1997 10 22 11 26 95 5.5 -9 669.10 -57.0 -56.2 -56.0 63 -99 SPO 1997 10 22 11 27 92 5.4 -9 669.10 -57.0 -56.2 -56.0 63 -99 SPO 1997 10 22 11 28 91 5.4 -9 669.10 -56.9 -56.2 -56.1 63 -99 SPO 1997 10 22 11 29 90 5.5 -9 669.10 -56.9 -56.2 -56.1 63 -99 SPO 1997 10 22 11 30 90 5.4 -9 669.10 -57.0 -56.2 -56.1 63 -99 SPO 1997 10 22 11 31 89 5.3 -9 669.10 -57.0 -56.3 -56.1 64 -99 SPO 1997 10 22 11 32 89 5.2 -9 669.10 -57.0 -56.4 -56.1 64 -99 SPO 1997 10 22 11 33 89 5.1 -9 669.10 -57.0 -56.4 -56.1 64 -99 SPO 1997 10 22 11 34 90 5.1 -9 669.10 -57.1 -56.4 -56.1 65 -99 SPO 1997 10 22 11 35 88 5.1 -9 669.10 -57.0 -56.4 -56.1 64 -99 SPO 1997 10 22 11 36 88 5.1 -9 669.10 -57.0 -56.4 -56.1 63 -99 SPO 1997 10 22 11 37 88 5.0 -9 669.10 -57.0 -56.4 -56.1 63 -99 SPO 1997 10 22 11 38 90 4.9 -9 669.20 -57.0 -56.5 -56.1 63 -99 SPO 1997 10 22 11 39 91 4.6 -9 669.20 -57.1 -56.5 -56.1 63 -99 SPO 1997 10 22 11 40 93 4.2 -9 669.20 -57.1 -56.5 -56.1 63 -99 SPO 1997 10 22 11 41 93 4.2 -9 669.30 -57.1 -56.5 -56.0 63 -99 SPO 1997 10 22 11 42 92 4.4 -9 669.30 -57.1 -56.5 -56.0 63 -99 SPO 1997 10 22 11 43 92 4.5 -9 669.30 -57.1 -56.5 -56.0 63 -99 SPO 1997 10 22 11 44 91 4.3 -9 669.30 -57.1 -56.5 -56.0 63 -99 SPO 1997 10 22 11 45 90 4.3 -9 669.30 -57.0 -56.5 -56.0 63 -99 SPO 1997 10 22 11 46 91 4.6 -9 669.30 -57.0 -56.5 -56.0 63 -99 SPO 1997 10 22 11 47 89 4.6 -9 669.30 -57.0 -56.5 -56.0 63 -99 SPO 1997 10 22 11 48 88 4.8 -9 669.30 -57.1 -56.5 -56.1 64 -99 SPO 1997 10 22 11 49 88 5.0 -9 669.30 -57.0 -56.5 -56.1 63 -99 SPO 1997 10 22 11 50 88 5.0 -9 669.30 -57.0 -56.4 -56.2 63 -99 SPO 1997 10 22 11 51 89 5.1 -9 669.30 -57.0 -56.5 -56.2 63 -99 SPO 1997 10 22 11 52 91 5.0 -9 669.30 -57.0 -56.5 -56.2 63 -99 SPO 1997 10 22 11 53 92 5.1 -9 669.40 -57.0 -56.4 -56.2 63 -99 SPO 1997 10 22 11 54 93 5.0 -9 669.40 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 11 55 94 4.8 -9 669.40 -57.1 -56.4 -56.2 65 -99 SPO 1997 10 22 11 56 96 4.9 -9 669.50 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 11 57 97 4.9 -9 669.50 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 11 58 96 4.8 -9 669.50 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 11 59 97 4.5 -9 669.50 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 12 00 98 4.3 -9 669.60 -57.1 -56.4 -56.2 64 0 SPO 1997 10 22 12 01 102 4.2 -9 669.60 -57.1 -56.4 -56.2 64 -99 SPO 1997 10 22 12 02 106 4.2 -9 669.60 -57.1 -56.4 -56.2 63 -99 SPO 1997 10 22 12 03 108 4.2 -9 669.70 -57.1 -56.5 -56.3 63 -99 SPO 1997 10 22 12 04 108 4.2 -9 669.70 -57.1 -56.5 -56.3 63 -99 SPO 1997 10 22 12 05 108 4.3 -9 669.70 -57.1 -56.5 -56.3 63 -99 SPO 1997 10 22 12 06 106 4.4 -9 669.70 -57.2 -56.4 -56.3 63 -99 SPO 1997 10 22 12 07 103 4.5 -9 669.70 -57.2 -56.5 -56.2 63 -99 SPO 1997 10 22 12 08 101 4.3 -9 669.70 -57.2 -56.5 -56.2 64 -99 SPO 1997 10 22 12 09 102 4.7 -9 669.70 -57.1 -56.5 -56.2 64 -99 SPO 1997 10 22 12 10 105 4.4 -9 669.70 -57.1 -56.5 -56.2 64 -99 SPO 1997 10 22 12 11 105 4.4 -9 669.70 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 22 12 12 105 4.5 -9 669.80 -57.1 -56.5 -56.2 64 -99 SPO 1997 10 22 12 13 103 4.4 -9 669.80 -57.1 -56.5 -56.2 65 -99 SPO 1997 10 22 12 14 104 4.3 -9 669.80 -57.1 -56.5 -56.2 66 -99 SPO 1997 10 22 12 15 107 4.4 -9 669.80 -57.2 -56.5 -56.3 66 -99 SPO 1997 10 22 12 16 105 4.7 -9 669.80 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 22 12 17 102 4.7 -9 669.80 -57.2 -56.5 -56.3 65 -99 SPO 1997 10 22 12 18 103 4.3 -9 669.90 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 22 12 19 108 4.5 -9 669.90 -57.1 -56.5 -56.3 64 -99 SPO 1997 10 22 12 20 111 4.3 -9 669.90 -57.1 -56.5 -56.4 64 -99 SPO 1997 10 22 12 21 111 4.3 -9 669.90 -57.2 -56.6 -56.5 65 -99 SPO 1997 10 22 12 22 112 4.4 -9 669.90 -57.1 -56.6 -56.5 64 -99 SPO 1997 10 22 12 23 114 4.3 -9 670.00 -57.2 -56.6 -56.6 65 -99 SPO 1997 10 22 12 24 117 4.3 -9 670.00 -57.2 -56.6 -56.7 65 -99 SPO 1997 10 22 12 25 119 4.3 -9 670.00 -57.3 -56.6 -56.8 66 -99 SPO 1997 10 22 12 26 119 4.3 -9 670.00 -57.3 -56.6 -56.8 66 -99 SPO 1997 10 22 12 27 119 4.5 -9 670.00 -57.2 -56.7 -56.8 65 -99 SPO 1997 10 22 12 28 119 4.3 -9 670.10 -57.2 -56.7 -56.8 64 -99 SPO 1997 10 22 12 29 119 4.5 -9 670.10 -57.2 -56.6 -56.8 64 -99 SPO 1997 10 22 12 30 120 4.5 -9 670.10 -57.2 -56.6 -56.8 64 -99 SPO 1997 10 22 12 31 121 4.5 -9 670.20 -57.3 -56.6 -56.8 65 -99 SPO 1997 10 22 12 32 124 4.3 -9 670.20 -57.3 -56.7 -56.9 66 -99 SPO 1997 10 22 12 33 127 4.4 -9 670.20 -57.3 -56.7 -56.9 66 -99 SPO 1997 10 22 12 34 129 4.6 -9 670.20 -57.4 -56.7 -57.0 67 -99 SPO 1997 10 22 12 35 128 4.5 -9 670.20 -57.4 -56.7 -57.0 67 -99 SPO 1997 10 22 12 36 128 4.5 -9 670.20 -57.5 -56.8 -57.1 67 -99 SPO 1997 10 22 12 37 127 4.3 -9 670.20 -57.6 -56.9 -57.2 67 -99 SPO 1997 10 22 12 38 127 4.3 -9 670.20 -57.6 -56.9 -57.2 67 -99 SPO 1997 10 22 12 39 126 4.5 -9 670.20 -57.6 -56.9 -57.2 67 -99 SPO 1997 10 22 12 40 122 4.7 -9 670.20 -57.6 -56.9 -57.3 66 -99 SPO 1997 10 22 12 41 113 4.8 -9 670.10 -57.6 -56.7 -57.2 65 -99 SPO 1997 10 22 12 42 107 4.8 -9 670.10 -57.5 -56.6 -56.9 64 -99 SPO 1997 10 22 12 43 106 4.7 -9 670.10 -57.5 -56.6 -56.8 63 -99 SPO 1997 10 22 12 44 108 4.5 -9 670.20 -57.5 -56.6 -56.7 64 -99 SPO 1997 10 22 12 45 109 4.5 -9 670.20 -57.5 -56.7 -56.8 64 -99 SPO 1997 10 22 12 46 107 4.5 -9 670.20 -57.5 -56.7 -56.8 65 -99 SPO 1997 10 22 12 47 106 4.5 -9 670.20 -57.4 -56.8 -56.7 65 -99 SPO 1997 10 22 12 48 106 4.6 -9 670.20 -57.4 -56.8 -56.7 65 -99 SPO 1997 10 22 12 49 104 4.6 -9 670.10 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 50 105 4.7 -9 670.20 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 51 104 4.5 -9 670.10 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 52 103 4.6 -9 670.10 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 53 103 4.6 -9 670.10 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 54 103 4.5 -9 670.20 -57.5 -56.8 -56.7 66 -99 SPO 1997 10 22 12 55 106 4.5 -9 670.20 -57.5 -56.8 -56.8 65 -99 SPO 1997 10 22 12 56 110 4.6 -9 670.20 -57.5 -56.8 -56.8 65 -99 SPO 1997 10 22 12 57 112 4.5 -9 670.20 -57.5 -56.8 -56.9 64 -99 SPO 1997 10 22 12 58 113 4.5 -9 670.30 -57.5 -56.8 -57.0 64 -99 SPO 1997 10 22 12 59 113 4.6 -9 670.30 -57.5 -56.8 -57.0 65 -99 SPO 1997 10 22 13 00 111 4.5 -9 670.30 -57.5 -56.8 -56.9 65 0 SPO 1997 10 22 13 01 111 4.5 -9 670.30 -57.5 -56.8 -56.9 65 -99 SPO 1997 10 22 13 02 109 4.5 -9 670.30 -57.4 -56.8 -56.9 64 -99 SPO 1997 10 22 13 03 107 4.7 -9 670.30 -57.4 -56.8 -56.8 64 -99 SPO 1997 10 22 13 04 105 4.7 -9 670.30 -57.4 -56.9 -56.8 65 -99 SPO 1997 10 22 13 05 104 4.7 -9 670.30 -57.4 -56.9 -56.7 65 -99 SPO 1997 10 22 13 06 102 4.7 -9 670.30 -57.4 -56.9 -56.7 65 -99 SPO 1997 10 22 13 07 100 4.5 -9 670.30 -57.4 -56.9 -56.7 65 -99 SPO 1997 10 22 13 08 99 5.1 -9 670.30 -57.4 -56.8 -56.7 65 -99 SPO 1997 10 22 13 09 98 4.9 -9 670.30 -57.4 -56.8 -56.7 65 -99 SPO 1997 10 22 13 10 99 5.0 -9 670.30 -57.3 -56.8 -56.7 65 -99 SPO 1997 10 22 13 11 98 5.0 -9 670.20 -57.3 -56.8 -56.6 65 -99 SPO 1997 10 22 13 12 98 5.0 -9 670.20 -57.3 -56.8 -56.7 66 -99 SPO 1997 10 22 13 13 97 5.2 -9 670.20 -57.3 -56.8 -56.7 66 -99 SPO 1997 10 22 13 14 96 5.1 -9 670.20 -57.3 -56.8 -56.7 66 -99 SPO 1997 10 22 13 15 94 5.3 -9 670.20 -57.3 -56.8 -56.7 66 -99 SPO 1997 10 22 13 16 92 5.4 -9 670.20 -57.3 -56.8 -56.7 67 -99 SPO 1997 10 22 13 17 91 5.4 -9 670.20 -57.2 -56.8 -56.7 66 -99 SPO 1997 10 22 13 18 90 5.5 -9 670.20 -57.3 -56.8 -56.7 67 -99 SPO 1997 10 22 13 19 90 5.3 -9 670.20 -57.2 -56.8 -56.7 65 -99 SPO 1997 10 22 13 20 90 5.0 -9 670.30 -57.3 -56.8 -56.7 66 -99 SPO 1997 10 22 13 21 95 5.0 -9 670.30 -57.2 -56.8 -56.7 64 -99 SPO 1997 10 22 13 22 98 4.7 -9 670.40 -57.2 -56.8 -56.6 64 -99 SPO 1997 10 22 13 23 98 4.6 -9 670.40 -57.3 -56.9 -56.6 64 -99 SPO 1997 10 22 13 24 95 4.6 -9 670.40 -57.3 -56.9 -56.6 64 -99 SPO 1997 10 22 13 25 93 4.9 -9 670.40 -57.3 -56.9 -56.6 64 -99 SPO 1997 10 22 13 26 92 5.0 -9 670.40 -57.3 -56.9 -56.6 64 -99 SPO 1997 10 22 13 27 94 5.1 -9 670.40 -57.2 -56.8 -56.6 64 -99 SPO 1997 10 22 13 28 95 4.9 -9 670.40 -57.3 -56.8 -56.6 65 -99 SPO 1997 10 22 13 29 97 5.0 -9 670.40 -57.3 -56.8 -56.6 66 -99 SPO 1997 10 22 13 30 99 5.2 -9 670.40 -57.3 -56.8 -56.6 66 -99 SPO 1997 10 22 13 31 98 4.9 -9 670.40 -57.3 -56.8 -56.6 66 -99 SPO 1997 10 22 13 32 99 5.2 -9 670.40 -57.3 -56.8 -56.6 66 -99 SPO 1997 10 22 13 33 99 5.2 -9 670.40 -57.3 -56.8 -56.6 65 -99 SPO 1997 10 22 13 34 100 5.2 -9 670.40 -57.3 -56.8 -56.6 64 -99 SPO 1997 10 22 13 35 98 5.3 -9 670.40 -57.3 -56.7 -56.6 64 -99 SPO 1997 10 22 13 36 98 5.2 -9 670.40 -57.2 -56.7 -56.6 63 -99 SPO 1997 10 22 13 37 98 5.5 -9 670.40 -57.3 -56.7 -56.6 64 -99 SPO 1997 10 22 13 38 98 5.4 -9 670.40 -57.2 -56.7 -56.6 63 -99 SPO 1997 10 22 13 39 99 5.6 -9 670.40 -57.3 -56.7 -56.6 65 -99 SPO 1997 10 22 13 40 98 5.5 -9 670.40 -57.3 -56.8 -56.7 64 -99 SPO 1997 10 22 13 41 97 5.7 -9 670.40 -57.3 -56.8 -56.7 65 -99 SPO 1997 10 22 13 42 98 5.8 -9 670.40 -57.3 -56.8 -56.7 64 -99 SPO 1997 10 22 13 43 99 5.7 -9 670.40 -57.3 -56.8 -56.7 64 -99 SPO 1997 10 22 13 44 99 5.7 -9 670.40 -57.4 -56.8 -56.7 65 -99 SPO 1997 10 22 13 45 98 5.8 -9 670.40 -57.3 -56.8 -56.8 63 -99 SPO 1997 10 22 13 46 96 5.9 -9 670.40 -57.3 -56.8 -56.8 63 -99 SPO 1997 10 22 13 47 94 5.9 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 48 95 6.0 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 49 96 6.0 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 50 97 5.7 -9 670.40 -57.4 -56.8 -56.8 64 -99 SPO 1997 10 22 13 51 96 5.9 -9 670.40 -57.3 -56.8 -56.8 63 -99 SPO 1997 10 22 13 52 95 5.8 -9 670.40 -57.4 -56.8 -56.8 64 -99 SPO 1997 10 22 13 53 93 5.9 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 54 92 6.0 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 55 93 6.0 -9 670.40 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 56 95 5.8 -9 670.50 -57.3 -56.7 -56.8 63 -99 SPO 1997 10 22 13 57 96 5.9 -9 670.50 -57.4 -56.7 -56.8 63 -99 SPO 1997 10 22 13 58 95 5.8 -9 670.50 -57.3 -56.7 -56.8 62 -99 SPO 1997 10 22 13 59 94 6.0 -9 670.50 -57.4 -56.8 -56.8 63 -99 SPO 1997 10 22 14 00 93 6.0 -9 670.50 -57.4 -56.8 -56.8 63 0 SPO 1997 10 22 14 01 90 6.1 -9 670.50 -57.4 -56.7 -56.8 63 -99 SPO 1997 10 22 14 02 89 6.0 -9 670.50 -57.4 -56.7 -56.8 63 -99 SPO 1997 10 22 14 03 89 5.8 -9 670.50 -57.4 -56.7 -56.8 63 -99 SPO 1997 10 22 14 04 90 5.8 -9 670.60 -57.4 -56.8 -56.8 63 -99 SPO 1997 10 22 14 05 89 5.8 -9 670.60 -57.4 -56.8 -56.8 63 -99 SPO 1997 10 22 14 06 87 5.8 -9 670.50 -57.4 -56.8 -56.8 63 -99 SPO 1997 10 22 14 07 85 5.8 -9 670.50 -57.4 -56.7 -56.9 63 -99 SPO 1997 10 22 14 08 85 6.0 -9 670.50 -57.4 -56.7 -56.9 63 -99 SPO 1997 10 22 14 09 85 6.0 -9 670.50 -57.4 -56.7 -56.9 63 -99 SPO 1997 10 22 14 10 83 6.0 -9 670.50 -57.4 -56.7 -56.9 63 -99 SPO 1997 10 22 14 11 83 5.9 -9 670.50 -57.4 -56.7 -56.9 63 -99 SPO 1997 10 22 14 12 84 5.9 -9 670.50 -57.4 -56.7 -56.9 62 -99 SPO 1997 10 22 14 13 85 6.0 -9 670.50 -57.4 -56.7 -56.9 62 -99 SPO 1997 10 22 14 14 83 5.8 -9 670.50 -57.4 -56.7 -56.9 62 -99 SPO 1997 10 22 14 15 83 5.8 -9 670.50 -57.4 -56.7 -56.9 62 -99 SPO 1997 10 22 14 16 83 5.9 -9 670.50 -57.4 -56.7 -56.9 62 -99 SPO 1997 10 22 14 17 85 5.7 -9 670.50 -57.4 -56.8 -56.9 62 -99 SPO 1997 10 22 14 18 85 5.7 -9 670.50 -57.4 -56.8 -56.9 62 -99 SPO 1997 10 22 14 19 85 5.7 -9 670.50 -57.4 -56.8 -56.8 62 -99 SPO 1997 10 22 14 20 85 5.5 -9 670.50 -57.4 -56.8 -56.8 62 -99 SPO 1997 10 22 14 21 85 5.5 -9 670.60 -57.4 -56.8 -56.8 62 -99 SPO 1997 10 22 14 22 86 5.6 -9 670.60 -57.4 -56.8 -56.8 61 -99 SPO 1997 10 22 14 23 87 5.5 -9 670.60 -57.4 -56.8 -56.8 61 -99 SPO 1997 10 22 14 24 87 5.5 -9 670.60 -57.4 -56.8 -56.8 60 -99 SPO 1997 10 22 14 25 87 5.6 -9 670.60 -57.4 -56.8 -56.8 60 -99 SPO 1997 10 22 14 26 85 5.8 -9 670.60 -57.3 -56.8 -56.8 60 -99 SPO 1997 10 22 14 27 85 5.8 -9 670.60 -57.4 -56.8 -56.9 61 -99 SPO 1997 10 22 14 28 86 5.9 -9 670.60 -57.4 -56.8 -56.9 61 -99 SPO 1997 10 22 14 29 85 5.9 -9 670.60 -57.4 -56.8 -56.9 61 -99 SPO 1997 10 22 14 30 84 6.0 -9 670.60 -57.4 -56.8 -56.9 61 -99 SPO 1997 10 22 14 31 84 5.9 -9 670.60 -57.4 -56.7 -56.9 61 -99 SPO 1997 10 22 14 32 85 5.8 -9 670.60 -57.4 -56.7 -56.9 61 -99 SPO 1997 10 22 14 33 86 5.7 -9 670.60 -57.4 -56.7 -56.9 60 -99 SPO 1997 10 22 14 34 86 5.5 -9 670.60 -57.4 -56.8 -56.9 59 -99 SPO 1997 10 22 14 35 88 5.2 -9 670.70 -57.5 -56.8 -56.8 59 -99 SPO 1997 10 22 14 36 88 5.2 -9 670.70 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 37 89 5.3 -9 670.70 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 38 87 5.2 -9 670.60 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 39 85 5.4 -9 670.60 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 40 84 5.6 -9 670.60 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 41 82 5.5 -9 670.60 -57.5 -56.9 -56.9 59 -99 SPO 1997 10 22 14 42 80 5.5 -9 670.60 -57.5 -56.8 -56.9 59 -99 SPO 1997 10 22 14 43 80 5.5 -9 670.60 -57.4 -56.8 -56.9 60 -99 SPO 1997 10 22 14 44 80 5.1 -9 670.70 -57.4 -56.8 -57.0 60 -99 SPO 1997 10 22 14 45 82 5.1 -9 670.70 -57.5 -56.8 -56.9 62 -99 SPO 1997 10 22 14 46 83 5.0 -9 670.70 -57.4 -56.8 -56.9 61 -99 SPO 1997 10 22 14 47 86 4.9 -9 670.70 -57.5 -56.8 -56.8 61 -99 SPO 1997 10 22 14 48 88 4.7 -9 670.70 -57.4 -56.9 -56.8 59 -99 SPO 1997 10 22 14 49 88 4.9 -9 670.80 -57.4 -56.9 -56.8 58 -99 SPO 1997 10 22 14 50 89 4.8 -9 670.80 -57.5 -56.9 -56.8 59 -99 SPO 1997 10 22 14 51 88 4.8 -9 670.80 -57.5 -56.9 -56.8 58 -99 SPO 1997 10 22 14 52 87 4.8 -9 670.80 -57.5 -56.9 -56.8 59 -99 SPO 1997 10 22 14 53 88 4.7 -9 670.80 -57.5 -57.0 -56.8 59 -99 SPO 1997 10 22 14 54 89 4.7 -9 670.80 -57.5 -57.0 -56.8 59 -99 SPO 1997 10 22 14 55 89 4.6 -9 670.80 -57.6 -57.0 -56.8 60 -99 SPO 1997 10 22 14 56 87 4.7 -9 670.80 -57.6 -57.0 -56.8 60 -99 SPO 1997 10 22 14 57 86 4.8 -9 670.80 -57.6 -56.9 -56.8 60 -99 SPO 1997 10 22 14 58 86 4.8 -9 670.80 -57.6 -56.9 -56.8 59 -99 SPO 1997 10 22 14 59 86 4.9 -9 670.80 -57.6 -56.9 -56.8 60 -99 SPO 1997 10 22 15 00 87 4.7 -9 670.80 -57.6 -56.9 -56.8 60 0 SPO 1997 10 22 15 01 89 4.9 -9 670.80 -57.6 -56.8 -56.8 59 -99 SPO 1997 10 22 15 02 91 4.9 -9 670.80 -57.6 -56.8 -56.8 59 -99 SPO 1997 10 22 15 03 90 5.0 -9 670.80 -57.6 -56.8 -56.8 59 -99 SPO 1997 10 22 15 04 88 5.1 -9 670.80 -57.6 -56.8 -56.9 59 -99 SPO 1997 10 22 15 05 87 5.1 -9 670.80 -57.6 -56.8 -56.9 59 -99 SPO 1997 10 22 15 06 88 5.2 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 07 89 5.2 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 08 89 5.0 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 09 89 5.2 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 10 89 5.1 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 11 88 5.1 -9 670.80 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 12 87 5.1 -9 670.90 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 13 87 5.2 -9 670.90 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 14 87 5.3 -9 670.90 -57.6 -56.8 -56.9 59 -99 SPO 1997 10 22 15 15 88 5.3 -9 670.90 -57.6 -56.8 -56.9 59 -99 SPO 1997 10 22 15 16 88 5.3 -9 670.90 -57.6 -56.7 -56.9 59 -99 SPO 1997 10 22 15 17 90 5.3 -9 670.90 -57.6 -56.7 -56.9 59 -99 SPO 1997 10 22 15 18 91 5.3 -9 670.90 -57.6 -56.7 -56.9 60 -99 SPO 1997 10 22 15 19 92 5.2 -9 670.90 -57.6 -56.7 -56.9 60 -99 SPO 1997 10 22 15 20 93 5.2 -9 671.00 -57.6 -56.8 -56.9 60 -99 SPO 1997 10 22 15 21 95 5.3 -9 671.00 -57.7 -56.8 -56.9 61 -99 SPO 1997 10 22 15 22 95 5.2 -9 671.00 -57.7 -56.8 -56.9 61 -99 SPO 1997 10 22 15 23 96 5.3 -9 671.00 -57.7 -56.7 -57.0 60 -99 SPO 1997 10 22 15 24 96 5.2 -9 671.00 -57.7 -56.7 -56.9 60 -99 SPO 1997 10 22 15 25 96 5.3 -9 671.10 -57.7 -56.8 -57.0 60 -99 SPO 1997 10 22 15 26 95 5.3 -9 671.10 -57.7 -56.8 -57.0 60 -99 SPO 1997 10 22 15 27 95 5.3 -9 671.10 -57.7 -56.8 -57.0 60 -99 SPO 1997 10 22 15 28 94 5.3 -9 671.10 -57.7 -56.8 -57.0 59 -99 SPO 1997 10 22 15 29 94 5.3 -9 671.10 -57.6 -56.8 -57.0 59 -99 SPO 1997 10 22 15 30 93 5.3 -9 671.00 -57.7 -56.7 -57.0 60 -99 SPO 1997 10 22 15 31 92 5.3 -9 671.00 -57.7 -56.7 -57.0 60 -99 SPO 1997 10 22 15 32 92 5.4 -9 671.00 -57.7 -56.7 -57.0 61 -99 SPO 1997 10 22 15 33 92 5.3 -9 671.10 -57.7 -56.7 -57.0 61 -99 SPO 1997 10 22 15 34 94 5.2 -9 671.10 -57.7 -56.8 -57.0 61 -99 SPO 1997 10 22 15 35 97 5.1 -9 671.10 -57.7 -56.8 -57.0 60 -99 SPO 1997 10 22 15 36 100 5.1 -9 671.10 -57.8 -56.8 -57.0 61 -99 SPO 1997 10 22 15 37 102 5.0 -9 671.20 -57.8 -56.8 -57.1 61 -99 SPO 1997 10 22 15 38 104 5.0 -9 671.20 -57.7 -56.9 -57.1 59 -99 SPO 1997 10 22 15 39 105 5.1 -9 671.20 -57.7 -56.8 -57.2 59 -99 SPO 1997 10 22 15 40 105 5.0 -9 671.20 -57.8 -56.8 -57.2 59 -99 SPO 1997 10 22 15 41 105 5.0 -9 671.20 -57.8 -56.8 -57.2 59 -99 SPO 1997 10 22 15 42 105 4.9 -9 671.20 -57.8 -56.9 -57.2 59 -99 SPO 1997 10 22 15 43 105 4.9 -9 671.30 -57.8 -56.9 -57.2 59 -99 SPO 1997 10 22 15 44 106 4.8 -9 671.30 -57.8 -56.9 -57.1 60 -99 SPO 1997 10 22 15 45 107 4.8 -9 671.30 -57.8 -56.8 -57.2 60 -99 SPO 1997 10 22 15 46 108 4.8 -9 671.30 -57.8 -56.8 -57.2 60 -99 SPO 1997 10 22 15 47 108 4.8 -9 671.30 -57.8 -56.8 -57.2 60 -99 SPO 1997 10 22 15 48 108 4.9 -9 671.40 -57.8 -56.8 -57.2 60 -99 SPO 1997 10 22 15 49 109 4.9 -9 671.40 -57.8 -56.7 -57.2 60 -99 SPO 1997 10 22 15 50 107 4.8 -9 671.40 -57.7 -56.7 -57.2 59 -99 SPO 1997 10 22 15 51 107 4.9 -9 671.40 -57.7 -56.7 -57.1 59 -99 SPO 1997 10 22 15 52 107 4.8 -9 671.40 -57.8 -56.7 -57.1 59 -99 SPO 1997 10 22 15 53 108 4.8 -9 671.40 -57.8 -56.7 -57.1 59 -99 SPO 1997 10 22 15 54 110 4.7 -9 671.50 -57.8 -56.7 -57.2 60 -99 SPO 1997 10 22 15 55 112 4.8 -9 671.50 -57.8 -56.7 -57.2 60 -99 SPO 1997 10 22 15 56 113 4.8 -9 671.50 -57.8 -56.7 -57.3 60 -99 SPO 1997 10 22 15 57 114 4.9 -9 671.50 -57.8 -56.8 -57.3 60 -99 SPO 1997 10 22 15 58 113 4.9 -9 671.50 -57.8 -56.8 -57.4 60 -99 SPO 1997 10 22 15 59 113 4.9 -9 671.50 -57.8 -56.7 -57.3 61 -99 SPO 1997 10 22 16 00 112 4.9 -9 671.50 -57.8 -56.7 -57.3 61 0 SPO 1997 10 22 16 01 112 5.0 -9 671.50 -57.8 -56.7 -57.3 61 -99 SPO 1997 10 22 16 02 112 5.0 -9 671.50 -57.9 -56.8 -57.3 61 -99 SPO 1997 10 22 16 03 113 5.1 -9 671.50 -57.9 -56.8 -57.4 60 -99 SPO 1997 10 22 16 04 113 5.2 -9 671.60 -57.9 -56.7 -57.4 60 -99 SPO 1997 10 22 16 05 111 5.2 -9 671.60 -57.9 -56.7 -57.4 59 -99 SPO 1997 10 22 16 06 111 5.2 -9 671.60 -57.9 -56.7 -57.3 59 -99 SPO 1997 10 22 16 07 109 5.3 -9 671.60 -57.8 -56.6 -57.3 59 -99 SPO 1997 10 22 16 08 110 5.2 -9 671.60 -57.8 -56.6 -57.2 59 -99 SPO 1997 10 22 16 09 110 5.1 -9 671.60 -57.8 -56.6 -57.3 60 -99 SPO 1997 10 22 16 10 112 5.1 -9 671.60 -57.8 -56.6 -57.3 61 -99 SPO 1997 10 22 16 11 112 5.0 -9 671.60 -57.8 -56.6 -57.3 61 -99 SPO 1997 10 22 16 12 112 5.1 -9 671.60 -57.9 -56.7 -57.4 61 -99 SPO 1997 10 22 16 13 111 5.2 -9 671.60 -57.9 -56.7 -57.4 60 -99 SPO 1997 10 22 16 14 113 5.0 -9 671.60 -58.0 -56.8 -57.4 61 -99 SPO 1997 10 22 16 15 119 5.0 -9 671.70 -58.0 -56.8 -57.6 60 -99 SPO 1997 10 22 16 16 122 5.0 -9 671.70 -58.0 -56.9 -57.6 59 -99 SPO 1997 10 22 16 17 121 5.1 -9 671.70 -58.1 -57.0 -57.7 60 -99 SPO 1997 10 22 16 18 116 5.1 -9 671.70 -58.1 -57.0 -57.7 59 -99 SPO 1997 10 22 16 19 112 5.3 -9 671.70 -58.0 -56.9 -57.6 59 -99 SPO 1997 10 22 16 20 111 5.1 -9 671.70 -58.0 -56.8 -57.5 59 -99 SPO 1997 10 22 16 21 113 5.2 -9 671.70 -58.0 -56.8 -57.5 60 -99 SPO 1997 10 22 16 22 118 5.1 -9 671.70 -58.0 -56.8 -57.6 60 -99 SPO 1997 10 22 16 23 120 5.0 -9 671.80 -58.0 -56.8 -57.6 60 -99 SPO 1997 10 22 16 24 122 5.1 -9 671.80 -58.1 -56.9 -57.7 61 -99 SPO 1997 10 22 16 25 122 5.0 -9 671.80 -58.1 -56.9 -57.7 60 -99 SPO 1997 10 22 16 26 122 5.0 -9 671.80 -58.1 -56.9 -57.8 60 -99 SPO 1997 10 22 16 27 125 5.1 -9 671.80 -58.2 -57.0 -57.8 60 -99 SPO 1997 10 22 16 28 127 5.0 -9 671.80 -58.2 -57.0 -57.8 59 -99 SPO 1997 10 22 16 29 127 5.1 -9 671.90 -58.3 -57.0 -57.9 60 -99 SPO 1997 10 22 16 30 124 5.1 -9 671.80 -58.3 -57.1 -57.9 59 -99 SPO 1997 10 22 16 31 123 5.2 -9 671.80 -58.3 -57.0 -57.9 60 -99 SPO 1997 10 22 16 32 122 5.2 -9 671.80 -58.3 -57.0 -57.9 60 -99 SPO 1997 10 22 16 33 121 5.1 -9 671.80 -58.3 -57.0 -57.9 61 -99 SPO 1997 10 22 16 34 121 5.1 -9 671.80 -58.2 -56.9 -57.8 60 -99 SPO 1997 10 22 16 35 120 5.1 -9 671.80 -58.2 -56.9 -57.8 60 -99 SPO 1997 10 22 16 36 120 5.0 -9 671.80 -58.2 -56.9 -57.8 61 -99 SPO 1997 10 22 16 37 118 5.2 -9 671.80 -58.1 -56.8 -57.8 60 -99 SPO 1997 10 22 16 38 115 5.2 -9 671.80 -58.1 -56.8 -57.6 61 -99 SPO 1997 10 22 16 39 112 5.2 -9 671.80 -58.1 -56.8 -57.6 60 -99 SPO 1997 10 22 16 40 111 5.3 -9 671.80 -58.1 -56.8 -57.5 60 -99 SPO 1997 10 22 16 41 113 5.2 -9 671.80 -58.1 -56.8 -57.5 60 -99 SPO 1997 10 22 16 42 114 5.0 -9 671.90 -58.0 -56.8 -57.5 59 -99 SPO 1997 10 22 16 43 116 4.8 -9 671.90 -58.1 -56.8 -57.6 61 -99 SPO 1997 10 22 16 44 115 4.9 -9 671.80 -58.1 -56.9 -57.6 61 -99 SPO 1997 10 22 16 45 111 5.0 -9 671.80 -58.1 -56.9 -57.6 61 -99 SPO 1997 10 22 16 46 107 5.1 -9 671.80 -58.2 -56.9 -57.5 62 -99 SPO 1997 10 22 16 47 107 5.2 -9 671.80 -58.2 -56.9 -57.4 62 -99 SPO 1997 10 22 16 48 110 5.0 -9 671.80 -58.2 -56.9 -57.5 62 -99 SPO 1997 10 22 16 49 115 4.7 -9 671.90 -58.3 -56.9 -57.6 62 -99 SPO 1997 10 22 16 50 120 4.5 -9 671.90 -58.3 -57.0 -57.8 62 -99 SPO 1997 10 22 16 51 122 4.4 -9 672.00 -58.3 -57.0 -57.9 62 -99 SPO 1997 10 22 16 52 120 4.5 -9 672.00 -58.4 -57.0 -57.9 61 -99 SPO 1997 10 22 16 53 115 4.7 -9 672.00 -58.4 -57.0 -57.8 60 -99 SPO 1997 10 22 16 54 113 4.8 -9 672.00 -58.3 -56.9 -57.7 60 -99 SPO 1997 10 22 16 55 112 4.9 -9 672.00 -58.3 -56.8 -57.6 60 -99 SPO 1997 10 22 16 56 113 4.8 -9 672.00 -58.2 -56.8 -57.6 61 -99 SPO 1997 10 22 16 57 113 4.7 -9 672.00 -58.2 -56.8 -57.6 61 -99 SPO 1997 10 22 16 58 113 4.7 -9 672.00 -58.2 -56.9 -57.6 61 -99 SPO 1997 10 22 16 59 113 4.7 -9 672.10 -58.2 -56.9 -57.6 61 -99 SPO 1997 10 22 17 00 113 4.6 -9 672.10 -58.2 -56.8 -57.5 61 0 SPO 1997 10 22 17 01 116 4.4 -9 672.10 -58.2 -56.8 -57.6 61 -99 SPO 1997 10 22 17 02 117 4.5 -9 672.10 -58.2 -56.9 -57.6 61 -99 SPO 1997 10 22 17 03 115 4.6 -9 672.10 -58.2 -57.0 -57.6 61 -99 SPO 1997 10 22 17 04 115 4.8 -9 672.10 -58.2 -57.0 -57.6 61 -99 SPO 1997 10 22 17 05 115 4.8 -9 672.10 -58.2 -57.0 -57.6 60 -99 SPO 1997 10 22 17 06 113 5.0 -9 672.10 -58.2 -56.9 -57.6 60 -99 SPO 1997 10 22 17 07 111 5.0 -9 672.10 -58.2 -56.9 -57.5 61 -99 SPO 1997 10 22 17 08 109 5.1 -9 672.10 -58.2 -56.9 -57.4 61 -99 SPO 1997 10 22 17 09 109 5.1 -9 672.10 -58.2 -56.8 -57.4 62 -99 SPO 1997 10 22 17 10 110 5.0 -9 672.10 -58.1 -56.8 -57.3 62 -99 SPO 1997 10 22 17 11 112 4.8 -9 672.10 -58.1 -56.8 -57.4 62 -99 SPO 1997 10 22 17 12 117 4.7 -9 672.20 -58.1 -56.9 -57.5 62 -99 SPO 1997 10 22 17 13 121 4.8 -9 672.20 -58.1 -56.9 -57.6 62 -99 SPO 1997 10 22 17 14 120 4.9 -9 672.20 -58.1 -57.0 -57.7 62 -99 SPO 1997 10 22 17 15 119 4.8 -9 672.20 -58.1 -57.0 -57.6 62 -99 SPO 1997 10 22 17 16 121 4.9 -9 672.30 -58.1 -57.0 -57.6 61 -99 SPO 1997 10 22 17 17 124 4.8 -9 672.30 -58.2 -57.0 -57.7 62 -99 SPO 1997 10 22 17 18 132 4.7 -9 672.40 -58.2 -57.1 -57.7 61 -99 SPO 1997 10 22 17 19 138 4.7 -9 672.40 -58.1 -57.2 -57.7 61 -99 SPO 1997 10 22 17 20 133 5.0 -9 672.40 -58.2 -57.3 -57.7 62 -99 SPO 1997 10 22 17 21 131 4.6 -9 672.30 -58.4 -57.3 -58.0 64 -99 SPO 1997 10 22 17 22 129 4.7 -9 672.40 -58.6 -57.3 -58.1 65 -99 SPO 1997 10 22 17 23 130 4.7 -9 672.40 -58.6 -57.2 -58.1 64 -99 SPO 1997 10 22 17 24 129 5.0 -9 672.40 -58.6 -57.2 -58.1 64 -99 SPO 1997 10 22 17 25 126 5.0 -9 672.40 -58.6 -57.2 -58.1 63 -99 SPO 1997 10 22 17 26 121 5.0 -9 672.40 -58.5 -57.2 -58.0 63 -99 SPO 1997 10 22 17 27 120 5.0 -9 672.40 -58.5 -57.1 -58.0 62 -99 SPO 1997 10 22 17 28 122 4.9 -9 672.40 -58.5 -57.0 -58.0 62 -99 SPO 1997 10 22 17 29 123 4.8 -9 672.40 -58.5 -57.1 -58.0 62 -99 SPO 1997 10 22 17 30 120 4.9 -9 672.40 -58.4 -57.2 -58.0 62 -99 SPO 1997 10 22 17 31 116 5.0 -9 672.40 -58.4 -57.1 -57.9 62 -99 SPO 1997 10 22 17 32 113 5.2 -9 672.40 -58.4 -57.1 -57.8 62 -99 SPO 1997 10 22 17 33 114 5.1 -9 672.40 -58.3 -57.0 -57.7 62 -99 SPO 1997 10 22 17 34 117 5.0 -9 672.40 -58.3 -57.1 -57.8 62 -99 SPO 1997 10 22 17 35 117 5.0 -9 672.40 -58.3 -57.2 -57.8 62 -99 SPO 1997 10 22 17 36 116 5.2 -9 672.40 -58.3 -57.3 -57.8 62 -99 SPO 1997 10 22 17 37 113 5.4 -9 672.40 -58.3 -57.3 -57.7 63 -99 SPO 1997 10 22 17 38 111 5.4 -9 672.30 -58.2 -57.2 -57.6 62 -99 SPO 1997 10 22 17 39 110 5.3 -9 672.30 -58.2 -57.1 -57.6 63 -99 SPO 1997 10 22 17 40 111 5.1 -9 672.30 -58.1 -57.1 -57.5 62 -99 SPO 1997 10 22 17 41 113 5.2 -9 672.30 -58.1 -57.1 -57.6 62 -99 SPO 1997 10 22 17 42 113 4.9 -9 672.30 -58.1 -57.1 -57.6 62 -99 SPO 1997 10 22 17 43 111 5.0 -9 672.30 -58.1 -57.1 -57.5 62 -99 SPO 1997 10 22 17 44 109 4.8 -9 672.40 -58.1 -57.1 -57.4 63 -99 SPO 1997 10 22 17 45 109 4.7 -9 672.40 -58.0 -57.1 -57.4 62 -99 SPO 1997 10 22 17 46 109 4.7 -9 672.40 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 17 47 111 4.5 -9 672.40 -58.0 -57.1 -57.3 63 -99 SPO 1997 10 22 17 48 115 4.3 -9 672.40 -58.0 -57.1 -57.4 63 -99 SPO 1997 10 22 17 49 117 4.5 -9 672.40 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 17 50 118 4.6 -9 672.40 -58.0 -57.2 -57.5 63 -99 SPO 1997 10 22 17 51 119 4.8 -9 672.50 -58.0 -57.2 -57.6 63 -99 SPO 1997 10 22 17 52 117 4.7 -9 672.40 -58.0 -57.2 -57.6 63 -99 SPO 1997 10 22 17 53 114 4.8 -9 672.40 -58.0 -57.2 -57.5 62 -99 SPO 1997 10 22 17 54 110 4.9 -9 672.40 -58.0 -57.1 -57.4 62 -99 SPO 1997 10 22 17 55 108 5.1 -9 672.40 -58.0 -57.0 -57.3 62 -99 SPO 1997 10 22 17 56 107 5.0 -9 672.40 -58.0 -56.8 -57.3 62 -99 SPO 1997 10 22 17 57 109 4.8 -9 672.50 -58.0 -56.8 -57.3 62 -99 SPO 1997 10 22 17 58 114 4.7 -9 672.50 -58.0 -56.9 -57.4 62 -99 SPO 1997 10 22 17 59 114 4.6 -9 672.50 -58.0 -56.9 -57.4 62 -99 SPO 1997 10 22 18 00 114 4.6 -9 672.60 -57.9 -57.0 -57.4 62 0 SPO 1997 10 22 18 01 113 4.5 -9 672.60 -57.9 -57.0 -57.3 62 -99 SPO 1997 10 22 18 02 114 4.5 -9 672.60 -57.9 -57.0 -57.4 64 -99 SPO 1997 10 22 18 03 116 4.3 -9 672.60 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 18 04 118 4.4 -9 672.70 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 18 05 116 4.5 -9 672.60 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 18 06 114 4.5 -9 672.60 -57.9 -57.2 -57.4 61 -99 SPO 1997 10 22 18 07 111 4.5 -9 672.60 -58.0 -57.2 -57.3 61 -99 SPO 1997 10 22 18 08 109 4.5 -9 672.60 -58.0 -57.2 -57.2 61 -99 SPO 1997 10 22 18 09 107 4.6 -9 672.60 -58.0 -57.2 -57.2 61 -99 SPO 1997 10 22 18 10 107 4.8 -9 672.60 -58.0 -57.1 -57.2 62 -99 SPO 1997 10 22 18 11 108 4.9 -9 672.60 -57.9 -57.1 -57.2 61 -99 SPO 1997 10 22 18 12 108 4.8 -9 672.60 -57.9 -57.1 -57.2 61 -99 SPO 1997 10 22 18 13 107 4.8 -9 672.60 -57.9 -57.1 -57.2 62 -99 SPO 1997 10 22 18 14 104 4.8 -9 672.60 -57.9 -57.1 -57.2 62 -99 SPO 1997 10 22 18 15 102 5.0 -9 672.60 -57.9 -57.1 -57.1 62 -99 SPO 1997 10 22 18 16 103 5.0 -9 672.60 -57.9 -57.0 -57.1 62 -99 SPO 1997 10 22 18 17 107 4.7 -9 672.60 -57.9 -57.0 -57.1 62 -99 SPO 1997 10 22 18 18 111 4.7 -9 672.60 -57.9 -57.0 -57.2 62 -99 SPO 1997 10 22 18 19 115 4.6 -9 672.70 -57.9 -57.1 -57.3 62 -99 SPO 1997 10 22 18 20 117 4.5 -9 672.70 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 18 21 112 4.9 -9 672.70 -57.9 -57.1 -57.4 62 -99 SPO 1997 10 22 18 22 109 4.8 -9 672.70 -57.9 -57.0 -57.3 62 -99 SPO 1997 10 22 18 23 108 4.7 -9 672.70 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 18 24 108 4.7 -9 672.70 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 18 25 108 4.7 -9 672.70 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 18 26 108 4.6 -9 672.70 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 18 27 110 4.6 -9 672.70 -58.0 -57.2 -57.3 62 -99 SPO 1997 10 22 18 28 111 4.6 -9 672.70 -58.0 -57.1 -57.3 62 -99 SPO 1997 10 22 18 29 111 4.3 -9 672.70 -57.9 -57.2 -57.3 61 -99 SPO 1997 10 22 18 30 112 4.4 -9 672.80 -57.9 -57.1 -57.3 61 -99 SPO 1997 10 22 18 31 112 4.2 -9 672.80 -57.9 -57.2 -57.2 62 -99 SPO 1997 10 22 18 32 111 4.4 -9 672.80 -57.9 -57.3 -57.3 62 -99 SPO 1997 10 22 18 33 110 4.3 -9 672.80 -57.9 -57.2 -57.2 62 -99 SPO 1997 10 22 18 34 109 4.2 -9 672.80 -58.0 -57.2 -57.2 63 -99 SPO 1997 10 22 18 35 109 4.4 -9 672.80 -57.9 -57.2 -57.2 62 -99 SPO 1997 10 22 18 36 107 4.4 -9 672.80 -57.9 -57.1 -57.1 64 -99 SPO 1997 10 22 18 37 107 4.4 -9 672.80 -57.9 -57.2 -57.1 64 -99 SPO 1997 10 22 18 38 108 4.4 -9 672.80 -57.9 -57.2 -57.1 62 -99 SPO 1997 10 22 18 39 109 4.3 -9 672.80 -57.8 -57.2 -57.1 63 -99 SPO 1997 10 22 18 40 109 4.2 -9 672.90 -57.8 -57.2 -57.1 64 -99 SPO 1997 10 22 18 41 110 4.2 -9 672.90 -57.9 -57.3 -57.1 65 -99 SPO 1997 10 22 18 42 108 4.0 -9 672.90 -57.9 -57.4 -57.1 64 -99 SPO 1997 10 22 18 43 107 4.2 -9 672.90 -58.0 -57.3 -57.1 65 -99 SPO 1997 10 22 18 44 105 4.2 -9 672.90 -58.0 -57.3 -57.1 65 -99 SPO 1997 10 22 18 45 107 4.4 -9 672.90 -57.9 -57.3 -57.1 64 -99 SPO 1997 10 22 18 46 108 4.2 -9 672.90 -58.0 -57.3 -57.1 65 -99 SPO 1997 10 22 18 47 110 4.3 -9 672.90 -58.0 -57.2 -57.2 66 -99 SPO 1997 10 22 18 48 110 4.3 -9 672.90 -58.0 -57.2 -57.2 66 -99 SPO 1997 10 22 18 49 109 4.5 -9 672.90 -58.0 -57.2 -57.2 66 -99 SPO 1997 10 22 18 50 107 4.4 -9 672.90 -57.9 -57.2 -57.1 65 -99 SPO 1997 10 22 18 51 109 4.4 -9 673.00 -57.9 -57.1 -57.1 65 -99 SPO 1997 10 22 18 52 113 4.3 -9 673.00 -57.9 -57.1 -57.2 66 -99 SPO 1997 10 22 18 53 118 4.2 -9 673.00 -57.9 -57.2 -57.3 65 -99 SPO 1997 10 22 18 54 119 4.3 -9 673.10 -57.9 -57.2 -57.4 64 -99 SPO 1997 10 22 18 55 115 4.2 -9 673.10 -57.9 -57.2 -57.4 64 -99 SPO 1997 10 22 18 56 114 4.4 -9 673.10 -57.9 -57.2 -57.4 64 -99 SPO 1997 10 22 18 57 116 4.4 -9 673.10 -58.0 -57.2 -57.4 63 -99 SPO 1997 10 22 18 58 120 4.5 -9 673.20 -58.0 -57.2 -57.5 65 -99 SPO 1997 10 22 18 59 121 4.6 -9 673.20 -58.0 -57.3 -57.5 65 -99 SPO 1997 10 22 19 00 122 4.5 -9 673.20 -58.0 -57.3 -57.5 65 0 SPO 1997 10 22 19 01 123 4.6 -9 673.20 -58.1 -57.2 -57.5 66 -99 SPO 1997 10 22 19 02 125 4.6 -9 673.20 -58.0 -57.2 -57.5 65 -99 SPO 1997 10 22 19 03 128 4.5 -9 673.20 -58.1 -57.3 -57.6 64 -99 SPO 1997 10 22 19 04 130 4.6 -9 673.20 -58.1 -57.3 -57.6 64 -99 SPO 1997 10 22 19 05 127 4.7 -9 673.30 -58.1 -57.3 -57.6 63 -99 SPO 1997 10 22 19 06 127 4.4 -9 673.30 -58.2 -57.3 -57.6 63 -99 SPO 1997 10 22 19 07 125 4.3 -9 673.30 -58.2 -57.4 -57.7 62 -99 SPO 1997 10 22 19 08 125 4.4 -9 673.30 -58.2 -57.4 -57.7 62 -99 SPO 1997 10 22 19 09 127 4.2 -9 673.30 -58.3 -57.4 -57.8 62 -99 SPO 1997 10 22 19 10 127 4.2 -9 673.30 -58.3 -57.4 -57.8 62 -99 SPO 1997 10 22 19 11 125 4.3 -9 673.30 -58.3 -57.4 -57.8 62 -99 SPO 1997 10 22 19 12 122 4.4 -9 673.30 -58.3 -57.4 -57.8 62 -99 SPO 1997 10 22 19 13 120 4.5 -9 673.30 -58.3 -57.4 -57.7 62 -99 SPO 1997 10 22 19 14 119 4.3 -9 673.30 -58.3 -57.4 -57.7 62 -99 SPO 1997 10 22 19 15 119 4.5 -9 673.30 -58.2 -57.3 -57.7 61 -99 SPO 1997 10 22 19 16 120 4.2 -9 673.30 -58.2 -57.3 -57.6 62 -99 SPO 1997 10 22 19 17 116 4.2 -9 673.30 -58.1 -57.3 -57.5 61 -99 SPO 1997 10 22 19 18 112 4.2 -9 673.30 -58.2 -57.2 -57.4 61 -99 SPO 1997 10 22 19 19 109 4.2 -9 673.30 -58.1 -57.3 -57.3 60 -99 SPO 1997 10 22 19 20 107 4.0 -9 673.30 -58.1 -57.3 -57.2 60 -99 SPO 1997 10 22 19 21 106 4.1 -9 673.30 -58.1 -57.3 -57.1 61 -99 SPO 1997 10 22 19 22 104 4.3 -9 673.30 -58.1 -57.3 -57.1 61 -99 SPO 1997 10 22 19 23 104 4.5 -9 673.30 -58.1 -57.2 -57.1 62 -99 SPO 1997 10 22 19 24 102 4.7 -9 673.30 -58.0 -57.2 -57.1 61 -99 SPO 1997 10 22 19 25 100 5.1 -9 673.30 -58.0 -57.2 -57.0 61 -99 SPO 1997 10 22 19 26 98 4.8 -9 673.20 -57.9 -57.1 -57.0 61 -99 SPO 1997 10 22 19 27 98 4.9 -9 673.20 -58.0 -57.2 -57.0 62 -99 SPO 1997 10 22 19 28 99 4.9 -9 673.20 -58.0 -57.2 -57.0 62 -99 SPO 1997 10 22 19 29 100 5.0 -9 673.30 -58.0 -57.2 -57.0 62 -99 SPO 1997 10 22 19 30 99 4.8 -9 673.30 -58.0 -57.3 -57.1 62 -99 SPO 1997 10 22 19 31 99 4.8 -9 673.30 -58.1 -57.3 -57.1 62 -99 SPO 1997 10 22 19 32 100 4.6 -9 673.30 -58.1 -57.3 -57.1 62 -99 SPO 1997 10 22 19 33 101 4.4 -9 673.40 -58.1 -57.3 -57.0 62 -99 SPO 1997 10 22 19 34 104 4.4 -9 673.40 -58.0 -57.3 -57.0 62 -99 SPO 1997 10 22 19 35 107 4.3 -9 673.50 -58.0 -57.3 -57.0 62 -99 SPO 1997 10 22 19 36 110 4.2 -9 673.50 -58.0 -57.3 -57.1 62 -99 SPO 1997 10 22 19 37 114 3.9 -9 673.50 -58.0 -57.4 -57.2 62 -99 SPO 1997 10 22 19 38 116 4.0 -9 673.50 -58.0 -57.4 -57.3 62 -99 SPO 1997 10 22 19 39 118 3.9 -9 673.60 -58.1 -57.4 -57.4 62 -99 SPO 1997 10 22 19 40 118 4.0 -9 673.60 -58.2 -57.4 -57.5 63 -99 SPO 1997 10 22 19 41 115 4.0 -9 673.50 -58.1 -57.4 -57.4 62 -99 SPO 1997 10 22 19 42 107 4.3 -9 673.50 -58.1 -57.4 -57.2 62 -99 SPO 1997 10 22 19 43 101 4.4 -9 673.40 -58.1 -57.3 -57.0 62 -99 SPO 1997 10 22 19 44 98 4.4 -9 673.40 -58.1 -57.2 -57.0 62 -99 SPO 1997 10 22 19 45 99 4.6 -9 673.40 -58.0 -57.2 -56.9 61 -99 SPO 1997 10 22 19 46 101 4.5 -9 673.50 -58.1 -57.3 -57.0 62 -99 SPO 1997 10 22 19 47 105 4.4 -9 673.50 -58.1 -57.3 -57.0 62 -99 SPO 1997 10 22 19 48 105 4.4 -9 673.50 -58.0 -57.4 -57.0 62 -99 SPO 1997 10 22 19 49 104 4.2 -9 673.50 -58.0 -57.4 -57.0 62 -99 SPO 1997 10 22 19 50 101 4.4 -9 673.50 -58.0 -57.4 -57.0 62 -99 SPO 1997 10 22 19 51 99 4.5 -9 673.50 -58.1 -57.4 -57.0 63 -99 SPO 1997 10 22 19 52 99 4.5 -9 673.50 -58.1 -57.4 -57.0 64 -99 SPO 1997 10 22 19 53 100 4.5 -9 673.60 -58.1 -57.4 -56.9 64 -99 SPO 1997 10 22 19 54 100 4.4 -9 673.60 -58.1 -57.4 -57.0 66 -99 SPO 1997 10 22 19 55 101 4.4 -9 673.60 -58.0 -57.4 -56.9 65 -99 SPO 1997 10 22 19 56 103 4.1 -9 673.60 -58.0 -57.4 -56.9 65 -99 SPO 1997 10 22 19 57 106 4.0 -9 673.60 -58.0 -57.4 -57.0 65 -99 SPO 1997 10 22 19 58 109 3.9 -9 673.70 -58.0 -57.4 -57.0 65 -99 SPO 1997 10 22 19 59 108 4.0 -9 673.70 -58.0 -57.4 -57.1 66 -99 SPO 1997 10 22 20 00 107 4.1 -9 673.70 -58.0 -57.5 -57.1 66 0 SPO 1997 10 22 20 01 107 4.1 -9 673.70 -58.0 -57.4 -57.0 66 -99 SPO 1997 10 22 20 02 105 4.4 -9 673.70 -58.0 -57.4 -57.0 66 -99 SPO 1997 10 22 20 03 103 4.5 -9 673.60 -58.0 -57.3 -56.9 66 -99 SPO 1997 10 22 20 04 102 4.5 -9 673.50 -58.0 -57.4 -56.9 66 -99 SPO 1997 10 22 20 05 104 4.4 -9 673.60 -58.0 -57.4 -56.9 67 -99 SPO 1997 10 22 20 06 108 4.4 -9 673.60 -58.0 -57.4 -57.0 66 -99 SPO 1997 10 22 20 07 108 4.5 -9 673.60 -58.1 -57.4 -57.2 67 -99 SPO 1997 10 22 20 08 105 4.7 -9 673.60 -58.1 -57.4 -57.1 66 -99 SPO 1997 10 22 20 09 102 4.7 -9 673.60 -58.0 -57.3 -57.0 66 -99 SPO 1997 10 22 20 10 101 4.5 -9 673.60 -58.1 -57.3 -57.0 67 -99 SPO 1997 10 22 20 11 103 4.5 -9 673.60 -58.1 -57.3 -57.0 67 -99 SPO 1997 10 22 20 12 104 4.4 -9 673.60 -58.1 -57.3 -57.0 67 -99 SPO 1997 10 22 20 13 105 4.4 -9 673.60 -58.1 -57.2 -57.1 67 -99 SPO 1997 10 22 20 14 106 4.6 -9 673.60 -58.1 -57.2 -57.1 67 -99 SPO 1997 10 22 20 15 106 4.6 -9 673.60 -58.1 -57.2 -57.1 67 -99 SPO 1997 10 22 20 16 106 4.7 -9 673.60 -58.1 -57.2 -57.1 67 -99 SPO 1997 10 22 20 17 104 4.8 -9 673.60 -58.0 -57.1 -57.1 66 -99 SPO 1997 10 22 20 18 101 4.9 -9 673.60 -57.9 -57.0 -57.0 66 -99 SPO 1997 10 22 20 19 98 5.2 -9 673.50 -57.8 -57.0 -56.9 64 -99 SPO 1997 10 22 20 20 96 4.9 -9 673.50 -57.8 -57.1 -56.9 65 -99 SPO 1997 10 22 20 21 97 4.8 -9 673.60 -57.9 -57.0 -56.9 67 -99 SPO 1997 10 22 20 22 100 4.8 -9 673.60 -57.8 -57.1 -56.9 67 -99 SPO 1997 10 22 20 23 99 4.8 -9 673.60 -57.9 -57.1 -56.9 67 -99 SPO 1997 10 22 20 24 100 4.6 -9 673.60 -57.9 -57.1 -56.9 67 -99 SPO 1997 10 22 20 25 99 4.6 -9 673.60 -58.0 -57.1 -56.9 68 -99 SPO 1997 10 22 20 26 101 4.6 -9 673.60 -58.0 -57.1 -57.0 67 -99 SPO 1997 10 22 20 27 101 4.6 -9 673.60 -58.0 -57.1 -57.0 67 -99 SPO 1997 10 22 20 28 100 4.6 -9 673.70 -58.0 -57.1 -57.0 67 -99 SPO 1997 10 22 20 29 100 4.7 -9 673.70 -58.0 -57.2 -57.0 67 -99 SPO 1997 10 22 20 30 100 4.7 -9 673.70 -58.0 -57.2 -57.0 67 -99 SPO 1997 10 22 20 31 103 4.8 -9 673.70 -58.0 -57.1 -57.1 66 -99 SPO 1997 10 22 20 32 103 4.7 -9 673.70 -58.0 -57.1 -57.1 66 -99 SPO 1997 10 22 20 33 107 4.7 -9 673.80 -58.0 -57.1 -57.1 66 -99 SPO 1997 10 22 20 34 108 4.8 -9 673.80 -58.0 -57.1 -57.2 65 -99 SPO 1997 10 22 20 35 110 4.5 -9 673.80 -58.0 -57.1 -57.3 65 -99 SPO 1997 10 22 20 36 112 4.5 -9 673.90 -58.1 -57.1 -57.3 66 -99 SPO 1997 10 22 20 37 115 4.3 -9 673.90 -58.1 -57.2 -57.5 66 -99 SPO 1997 10 22 20 38 118 4.2 -9 673.90 -58.1 -57.3 -57.6 66 -99 SPO 1997 10 22 20 39 116 4.2 -9 673.90 -58.1 -57.3 -57.6 66 -99 SPO 1997 10 22 20 40 113 4.2 -9 673.90 -58.2 -57.3 -57.5 67 -99 SPO 1997 10 22 20 41 113 4.2 -9 674.00 -58.2 -57.3 -57.5 67 -99 SPO 1997 10 22 20 42 113 4.1 -9 674.00 -58.2 -57.3 -57.5 66 -99 SPO 1997 10 22 20 43 113 4.2 -9 674.00 -58.2 -57.4 -57.5 66 -99 SPO 1997 10 22 20 44 114 4.0 -9 674.00 -58.2 -57.3 -57.5 65 -99 SPO 1997 10 22 20 45 111 4.2 -9 674.00 -58.2 -57.3 -57.5 65 -99 SPO 1997 10 22 20 46 106 4.2 -9 673.90 -58.2 -57.2 -57.4 64 -99 SPO 1997 10 22 20 47 103 4.3 -9 673.90 -58.2 -57.2 -57.3 64 -99 SPO 1997 10 22 20 48 101 5.0 -9 673.90 -58.2 -57.1 -57.2 66 -99 SPO 1997 10 22 20 49 99 4.8 -9 673.90 -58.0 -57.0 -57.2 65 -99 SPO 1997 10 22 20 50 101 5.0 -9 673.90 -58.0 -57.0 -57.2 66 -99 SPO 1997 10 22 20 51 101 5.0 -9 673.80 -58.0 -57.1 -57.2 66 -99 SPO 1997 10 22 20 52 101 5.1 -9 673.80 -58.1 -57.1 -57.3 66 -99 SPO 1997 10 22 20 53 100 5.1 -9 673.80 -58.2 -57.2 -57.4 68 -99 SPO 1997 10 22 20 54 100 5.1 -9 673.80 -58.2 -57.2 -57.4 67 -99 SPO 1997 10 22 20 55 100 5.2 -9 673.80 -58.2 -57.2 -57.4 66 -99 SPO 1997 10 22 20 56 100 5.0 -9 673.90 -58.2 -57.2 -57.4 65 -99 SPO 1997 10 22 20 57 99 4.9 -9 673.90 -58.2 -57.2 -57.4 65 -99 SPO 1997 10 22 20 58 101 4.7 -9 673.90 -58.2 -57.1 -57.4 65 -99 SPO 1997 10 22 20 59 103 4.5 -9 673.90 -58.2 -57.1 -57.4 65 -99 SPO 1997 10 22 21 00 104 4.4 -9 674.00 -58.2 -57.1 -57.5 66 0 SPO 1997 10 22 21 01 107 4.4 -9 674.00 -58.2 -57.1 -57.5 65 -99 SPO 1997 10 22 21 02 110 4.2 -9 674.00 -58.2 -57.2 -57.6 66 -99 SPO 1997 10 22 21 03 113 4.3 -9 674.00 -58.3 -57.2 -57.8 66 -99 SPO 1997 10 22 21 04 116 4.3 -9 674.10 -58.3 -57.3 -57.8 66 -99 SPO 1997 10 22 21 05 117 4.5 -9 674.10 -58.3 -57.3 -57.9 66 -99 SPO 1997 10 22 21 06 117 4.6 -9 674.10 -58.3 -57.3 -57.9 65 -99 SPO 1997 10 22 21 07 114 4.7 -9 674.00 -58.3 -57.2 -57.8 64 -99 SPO 1997 10 22 21 08 108 4.9 -9 674.00 -58.3 -57.2 -57.8 64 -99 SPO 1997 10 22 21 09 104 5.2 -9 674.00 -58.3 -57.1 -57.6 64 -99 SPO 1997 10 22 21 10 101 5.2 -9 674.00 -58.3 -57.1 -57.6 64 -99 SPO 1997 10 22 21 11 101 5.3 -9 674.00 -58.2 -57.0 -57.5 63 -99 SPO 1997 10 22 21 12 102 5.2 -9 674.00 -58.3 -57.0 -57.5 65 -99 SPO 1997 10 22 21 13 103 5.2 -9 674.00 -58.3 -57.0 -57.5 65 -99 SPO 1997 10 22 21 14 104 5.2 -9 674.00 -58.2 -57.1 -57.6 64 -99 SPO 1997 10 22 21 15 104 5.1 -9 674.00 -58.2 -57.1 -57.6 65 -99 SPO 1997 10 22 21 16 104 5.0 -9 674.00 -58.2 -57.1 -57.5 65 -99 SPO 1997 10 22 21 17 103 5.0 -9 674.00 -58.2 -57.1 -57.5 65 -99 SPO 1997 10 22 21 18 100 5.0 -9 674.00 -58.2 -57.1 -57.5 64 -99 SPO 1997 10 22 21 19 99 5.0 -9 673.90 -58.2 -57.1 -57.4 64 -99 SPO 1997 10 22 21 20 97 4.9 -9 673.90 -58.2 -57.0 -57.4 64 -99 SPO 1997 10 22 21 21 96 4.8 -9 673.90 -58.2 -57.0 -57.4 64 -99 SPO 1997 10 22 21 22 97 4.8 -9 673.90 -58.1 -57.0 -57.4 63 -99 SPO 1997 10 22 21 23 98 4.8 -9 674.00 -58.1 -57.0 -57.4 63 -99 SPO 1997 10 22 21 24 100 4.7 -9 674.00 -58.1 -57.0 -57.4 64 -99 SPO 1997 10 22 21 25 99 4.6 -9 674.00 -58.1 -57.1 -57.5 66 -99 SPO 1997 10 22 21 26 98 4.6 -9 674.00 -58.1 -57.1 -57.5 66 -99 SPO 1997 10 22 21 27 96 4.8 -9 674.00 -58.1 -57.0 -57.5 66 -99 SPO 1997 10 22 21 28 95 4.8 -9 674.00 -58.1 -57.0 -57.5 64 -99 SPO 1997 10 22 21 29 96 5.0 -9 674.00 -58.1 -57.0 -57.5 66 -99 SPO 1997 10 22 21 30 97 4.9 -9 673.90 -58.1 -56.9 -57.5 66 -99 SPO 1997 10 22 21 31 99 5.0 -9 673.90 -58.0 -56.9 -57.5 65 -99 SPO 1997 10 22 21 32 99 4.9 -9 673.90 -58.0 -56.9 -57.4 65 -99 SPO 1997 10 22 21 33 98 5.0 -9 673.90 -58.0 -56.9 -57.4 63 -99 SPO 1997 10 22 21 34 97 5.0 -9 673.90 -58.0 -56.9 -57.4 63 -99 SPO 1997 10 22 21 35 96 5.1 -9 674.00 -57.9 -56.8 -57.4 64 -99 SPO 1997 10 22 21 36 95 5.0 -9 674.00 -57.9 -56.8 -57.3 64 -99 SPO 1997 10 22 21 37 94 4.8 -9 674.00 -57.8 -56.7 -57.3 64 -99 SPO 1997 10 22 21 38 94 4.9 -9 674.00 -57.8 -56.7 -57.2 64 -99 SPO 1997 10 22 21 39 92 4.9 -9 674.00 -57.8 -56.6 -57.2 65 -99 SPO 1997 10 22 21 40 90 5.0 -9 674.00 -57.8 -56.6 -57.2 66 -99 SPO 1997 10 22 21 41 90 5.1 -9 674.00 -57.8 -56.6 -57.2 67 -99 SPO 1997 10 22 21 42 88 5.1 -9 674.00 -57.7 -56.5 -57.2 67 -99 SPO 1997 10 22 21 43 89 5.2 -9 674.00 -57.7 -56.5 -57.2 67 -99 SPO 1997 10 22 21 44 90 5.1 -9 674.00 -57.7 -56.4 -57.2 67 -99 SPO 1997 10 22 21 45 93 5.0 -9 674.10 -57.7 -56.5 -57.2 67 -99 SPO 1997 10 22 21 46 95 5.0 -9 674.10 -57.7 -56.5 -57.2 66 -99 SPO 1997 10 22 21 47 96 4.9 -9 674.10 -57.8 -56.5 -57.2 67 -99 SPO 1997 10 22 21 48 97 4.9 -9 674.10 -57.7 -56.5 -57.2 66 -99 SPO 1997 10 22 21 49 98 4.8 -9 674.10 -57.7 -56.5 -57.2 66 -99 SPO 1997 10 22 21 50 98 4.8 -9 674.10 -57.8 -56.5 -57.2 67 -99 SPO 1997 10 22 21 51 96 4.9 -9 674.10 -57.7 -56.6 -57.2 66 -99 SPO 1997 10 22 21 52 95 4.9 -9 674.10 -57.7 -56.5 -57.2 66 -99 SPO 1997 10 22 21 53 93 4.9 -9 674.10 -57.7 -56.5 -57.2 66 -99 SPO 1997 10 22 21 54 91 5.0 -9 674.00 -57.7 -56.4 -57.2 66 -99 SPO 1997 10 22 21 55 90 5.0 -9 674.00 -57.8 -56.4 -57.1 67 -99 SPO 1997 10 22 21 56 87 5.0 -9 674.00 -57.8 -56.4 -57.1 67 -99 SPO 1997 10 22 21 57 87 5.1 -9 674.00 -57.8 -56.4 -57.1 67 -99 SPO 1997 10 22 21 58 87 5.1 -9 674.00 -57.7 -56.3 -57.1 66 -99 SPO 1997 10 22 21 59 88 5.1 -9 674.00 -57.8 -56.3 -57.1 67 -99 SPO 1997 10 22 22 00 89 5.1 -9 674.00 -57.8 -56.3 -57.1 67 0 SPO 1997 10 22 22 01 91 5.1 -9 674.00 -57.8 -56.3 -57.1 67 -99 SPO 1997 10 22 22 02 91 5.3 -9 674.00 -57.8 -56.3 -57.0 67 -99 SPO 1997 10 22 22 03 90 5.3 -9 674.00 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 22 22 04 89 5.4 -9 674.00 -57.8 -56.2 -57.0 67 -99 SPO 1997 10 22 22 05 89 5.4 -9 674.00 -57.8 -56.1 -56.9 67 -99 SPO 1997 10 22 22 06 89 5.3 -9 674.10 -57.8 -56.2 -56.9 67 -99 SPO 1997 10 22 22 07 89 5.2 -9 674.10 -57.8 -56.2 -56.9 67 -99 SPO 1997 10 22 22 08 90 5.0 -9 674.10 -57.8 -56.2 -56.8 67 -99 SPO 1997 10 22 22 09 90 5.0 -9 674.10 -57.8 -56.1 -56.8 67 -99 SPO 1997 10 22 22 10 90 4.8 -9 674.20 -57.8 -56.1 -56.8 66 -99 SPO 1997 10 22 22 11 90 4.8 -9 674.20 -57.8 -56.1 -56.7 65 -99 SPO 1997 10 22 22 12 93 4.7 -9 674.20 -57.8 -56.1 -56.7 66 -99 SPO 1997 10 22 22 13 96 4.5 -9 674.20 -57.8 -56.2 -56.7 66 -99 SPO 1997 10 22 22 14 100 4.5 -9 674.30 -57.9 -56.2 -56.8 67 -99 SPO 1997 10 22 22 15 103 4.4 -9 674.30 -57.9 -56.3 -57.0 66 -99 SPO 1997 10 22 22 16 103 4.4 -9 674.30 -58.0 -56.3 -57.0 67 -99 SPO 1997 10 22 22 17 101 4.5 -9 674.30 -58.0 -56.3 -57.0 67 -99 SPO 1997 10 22 22 18 99 4.6 -9 674.30 -57.9 -56.3 -56.8 67 -99 SPO 1997 10 22 22 19 98 4.7 -9 674.30 -57.9 -56.2 -56.8 67 -99 SPO 1997 10 22 22 20 98 4.8 -9 674.20 -57.8 -56.1 -56.8 66 -99 SPO 1997 10 22 22 21 97 5.0 -9 674.30 -57.8 -56.1 -56.8 65 -99 SPO 1997 10 22 22 22 98 5.1 -9 674.30 -57.7 -56.1 -56.9 64 -99 SPO 1997 10 22 22 23 98 5.2 -9 674.30 -57.7 -56.1 -57.0 64 -99 SPO 1997 10 22 22 24 98 5.2 -9 674.30 -57.6 -55.9 -56.9 63 -99 SPO 1997 10 22 22 25 97 5.2 -9 674.30 -57.6 -55.9 -56.9 63 -99 SPO 1997 10 22 22 26 99 5.0 -9 674.30 -57.6 -55.9 -56.9 64 -99 SPO 1997 10 22 22 27 101 4.8 -9 674.30 -57.6 -56.0 -56.9 65 -99 SPO 1997 10 22 22 28 100 4.9 -9 674.30 -57.7 -56.1 -57.0 67 -99 SPO 1997 10 22 22 29 97 5.0 -9 674.30 -57.8 -56.1 -57.0 67 -99 SPO 1997 10 22 22 30 94 5.1 -9 674.30 -57.7 -56.0 -56.9 67 -99 SPO 1997 10 22 22 31 93 5.2 -9 674.30 -57.7 -56.0 -56.9 67 -99 SPO 1997 10 22 22 32 93 5.1 -9 674.30 -57.6 -56.0 -56.9 67 -99 SPO 1997 10 22 22 33 92 4.9 -9 674.30 -57.6 -56.0 -56.9 67 -99 SPO 1997 10 22 22 34 92 4.8 -9 674.40 -57.6 -56.1 -56.9 67 -99 SPO 1997 10 22 22 35 94 4.8 -9 674.40 -57.6 -56.1 -56.9 66 -99 SPO 1997 10 22 22 36 95 4.7 -9 674.40 -57.7 -56.1 -57.0 67 -99 SPO 1997 10 22 22 37 96 4.7 -9 674.40 -57.7 -56.0 -57.0 67 -99 SPO 1997 10 22 22 38 94 4.9 -9 674.40 -57.7 -56.0 -57.1 67 -99 SPO 1997 10 22 22 39 90 5.2 -9 674.40 -57.8 -55.9 -57.1 67 -99 SPO 1997 10 22 22 40 87 5.2 -9 674.30 -57.7 -55.8 -57.1 67 -99 SPO 1997 10 22 22 41 85 5.3 -9 674.30 -57.7 -55.8 -57.1 67 -99 SPO 1997 10 22 22 42 84 5.3 -9 674.30 -57.7 -55.7 -57.1 67 -99 SPO 1997 10 22 22 43 82 5.3 -9 674.30 -57.6 -55.7 -57.1 67 -99 SPO 1997 10 22 22 44 83 5.2 -9 674.40 -57.6 -55.7 -57.1 67 -99 SPO 1997 10 22 22 45 83 5.1 -9 674.40 -57.6 -55.7 -57.0 67 -99 SPO 1997 10 22 22 46 84 5.1 -9 674.40 -57.6 -55.7 -57.0 67 -99 SPO 1997 10 22 22 47 86 5.0 -9 674.40 -57.6 -55.7 -57.0 66 -99 SPO 1997 10 22 22 48 88 5.1 -9 674.40 -57.6 -55.6 -57.0 65 -99 SPO 1997 10 22 22 49 88 5.2 -9 674.40 -57.6 -55.5 -57.0 65 -99 SPO 1997 10 22 22 50 89 5.2 -9 674.40 -57.6 -55.5 -57.0 66 -99 SPO 1997 10 22 22 51 90 5.1 -9 674.40 -57.6 -55.5 -56.9 67 -99 SPO 1997 10 22 22 52 91 5.0 -9 674.40 -57.6 -55.5 -56.7 67 -99 SPO 1997 10 22 22 53 91 5.0 -9 674.40 -57.6 -55.5 -56.6 67 -99 SPO 1997 10 22 22 54 91 5.0 -9 674.40 -57.5 -55.5 -56.5 67 -99 SPO 1997 10 22 22 55 89 5.0 -9 674.40 -57.6 -55.4 -56.5 68 -99 SPO 1997 10 22 22 56 88 5.1 -9 674.40 -57.6 -55.5 -56.5 68 -99 SPO 1997 10 22 22 57 88 5.2 -9 674.40 -57.6 -55.5 -56.5 67 -99 SPO 1997 10 22 22 58 88 5.2 -9 674.40 -57.6 -55.5 -56.5 67 -99 SPO 1997 10 22 22 59 91 5.2 -9 674.40 -57.7 -55.6 -56.6 67 -99 SPO 1997 10 22 23 00 92 5.2 -9 674.60 -57.7 -55.6 -56.6 67 0 SPO 1997 10 22 23 01 93 5.3 -9 674.50 -57.7 -55.6 -56.6 67 -99 SPO 1997 10 22 23 02 92 5.3 -9 674.40 -57.7 -55.7 -56.6 67 -99 SPO 1997 10 22 23 03 91 5.5 -9 674.40 -57.7 -55.7 -56.6 67 -99 SPO 1997 10 22 23 04 91 5.5 -9 674.40 -57.7 -55.7 -56.7 67 -99 SPO 1997 10 22 23 05 90 5.5 -9 674.40 -57.7 -55.6 -56.6 67 -99 SPO 1997 10 22 23 06 91 5.3 -9 674.40 -57.7 -55.6 -56.6 68 -99 SPO 1997 10 22 23 07 94 5.0 -9 674.40 -57.7 -55.6 -56.6 68 -99 SPO 1997 10 22 23 08 97 4.8 -9 674.40 -57.6 -55.7 -56.5 67 -99 SPO 1997 10 22 23 09 99 4.7 -9 674.50 -57.5 -55.7 -56.5 67 -99 SPO 1997 10 22 23 10 100 4.7 -9 674.50 -57.5 -55.8 -56.5 66 -99 SPO 1997 10 22 23 11 100 4.8 -9 674.50 -57.4 -55.8 -56.4 65 -99 SPO 1997 10 22 23 12 98 4.9 -9 674.50 -57.4 -55.8 -56.4 65 -99 SPO 1997 10 22 23 13 98 5.0 -9 674.50 -57.5 -55.8 -56.4 66 -99 SPO 1997 10 22 23 14 100 4.9 -9 674.50 -57.5 -55.8 -56.4 65 -99 SPO 1997 10 22 23 15 103 4.8 -9 674.50 -57.6 -55.8 -56.6 67 -99 SPO 1997 10 22 23 16 106 4.6 -9 674.60 -57.7 -55.9 -56.9 67 -99 SPO 1997 10 22 23 17 107 4.5 -9 674.60 -57.9 -55.9 -57.2 68 -99 SPO 1997 10 22 23 18 103 4.5 -9 674.60 -58.0 -55.9 -57.3 69 -99 SPO 1997 10 22 23 19 101 4.4 -9 674.60 -57.9 -56.0 -57.2 67 -99 SPO 1997 10 22 23 20 103 4.4 -9 674.70 -57.9 -56.0 -57.2 67 -99 SPO 1997 10 22 23 21 109 4.2 -9 674.70 -57.8 -56.1 -57.2 67 -99 SPO 1997 10 22 23 22 116 4.1 -9 674.70 -57.8 -56.0 -57.2 67 -99 SPO 1997 10 22 23 23 118 4.2 -9 674.80 -57.9 -56.0 -57.2 67 -99 SPO 1997 10 22 23 24 115 4.2 -9 674.80 -57.9 -56.0 -57.2 67 -99 SPO 1997 10 22 23 25 106 4.4 -9 674.70 -57.8 -56.1 -57.0 67 -99 SPO 1997 10 22 23 26 100 4.7 -9 674.70 -57.8 -56.0 -56.7 66 -99 SPO 1997 10 22 23 27 97 4.7 -9 674.70 -57.8 -55.9 -56.6 67 -99 SPO 1997 10 22 23 28 97 4.5 -9 674.70 -57.8 -55.9 -56.8 67 -99 SPO 1997 10 22 23 29 96 4.5 -9 674.70 -57.9 -55.9 -56.9 67 -99 SPO 1997 10 22 23 30 95 4.5 -9 674.70 -57.8 -56.0 -56.9 67 -99 SPO 1997 10 22 23 31 92 4.5 -9 674.70 -57.9 -56.0 -56.8 67 -99 SPO 1997 10 22 23 32 89 4.6 -9 674.60 -57.9 -56.1 -56.7 67 -99 SPO 1997 10 22 23 33 85 4.9 -9 674.60 -57.9 -56.1 -56.7 67 -99 SPO 1997 10 22 23 34 83 5.1 -9 674.60 -57.8 -56.0 -56.7 67 -99 SPO 1997 10 22 23 35 81 5.3 -9 674.50 -57.8 -55.9 -56.7 67 -99 SPO 1997 10 22 23 36 80 5.4 -9 674.60 -57.8 -55.9 -56.7 67 -99 SPO 1997 10 22 23 37 81 5.2 -9 674.60 -57.7 -55.9 -56.7 66 -99 SPO 1997 10 22 23 38 86 4.9 -9 674.60 -57.7 -56.0 -56.6 66 -99 SPO 1997 10 22 23 39 91 4.7 -9 674.70 -57.8 -56.1 -56.5 67 -99 SPO 1997 10 22 23 40 95 4.5 -9 674.70 -57.8 -56.2 -56.6 66 -99 SPO 1997 10 22 23 41 96 4.4 -9 674.70 -57.8 -56.2 -56.7 67 -99 SPO 1997 10 22 23 42 94 4.5 -9 674.70 -57.8 -56.3 -56.8 66 -99 SPO 1997 10 22 23 43 92 4.5 -9 674.70 -57.8 -56.3 -56.6 66 -99 SPO 1997 10 22 23 44 93 4.5 -9 674.70 -57.9 -56.3 -56.6 67 -99 SPO 1997 10 22 23 45 92 4.3 -9 674.70 -57.9 -56.3 -56.6 67 -99 SPO 1997 10 22 23 46 92 4.2 -9 674.80 -58.0 -56.3 -56.5 67 -99 SPO 1997 10 22 23 47 93 4.2 -9 674.80 -58.0 -56.3 -56.5 66 -99 SPO 1997 10 22 23 48 92 4.1 -9 674.80 -58.1 -56.3 -56.6 66 -99 SPO 1997 10 22 23 49 93 4.2 -9 674.80 -58.1 -56.2 -56.6 66 -99 SPO 1997 10 22 23 50 93 4.4 -9 674.80 -58.1 -56.2 -56.6 66 -99 SPO 1997 10 22 23 51 95 4.4 -9 674.80 -58.1 -56.1 -56.7 64 -99 SPO 1997 10 22 23 52 98 4.3 -9 674.80 -58.2 -56.2 -56.9 65 -99 SPO 1997 10 22 23 53 106 4.2 -9 674.90 -58.2 -56.2 -57.2 64 -99 SPO 1997 10 22 23 54 112 4.1 -9 674.90 -58.3 -56.3 -57.5 66 -99 SPO 1997 10 22 23 55 116 4.2 -9 674.90 -58.4 -56.3 -57.6 66 -99 SPO 1997 10 22 23 56 117 4.1 -9 675.00 -58.4 -56.2 -57.7 66 -99 SPO 1997 10 22 23 57 123 4.0 -9 675.00 -58.4 -56.2 -57.6 66 -99 SPO 1997 10 22 23 58 126 4.2 -9 675.00 -58.2 -56.3 -57.4 -99 -99 SPO 1997 10 22 23 59 130 4.2 -9 675.00 -58.0 -56.3 -57.3 -99 -99 SPO 1997 10 23 00 00 127 4.3 -9 675.00 -58.0 -56.3 -57.3 -99 0 SPO 1997 10 23 00 01 123 4.5 -9 675.00 -58.2 -56.3 -57.4 -99 -99 SPO 1997 10 23 00 02 119 4.7 -9 675.00 -58.1 -56.2 -57.5 -99 -99 SPO 1997 10 23 00 03 119 4.7 -9 675.00 -58.0 -56.2 -57.4 63 -99 SPO 1997 10 23 00 04 120 4.7 -9 675.00 -58.0 -56.2 -57.5 62 -99 SPO 1997 10 23 00 05 121 4.8 -9 675.10 -58.1 -56.2 -57.5 63 -99 SPO 1997 10 23 00 06 121 4.9 -9 675.10 -58.2 -56.3 -57.5 64 -99 SPO 1997 10 23 00 07 118 4.8 -9 675.00 -58.2 -56.3 -57.6 61 -99 SPO 1997 10 23 00 08 112 4.9 -9 675.00 -58.3 -56.3 -57.6 57 -99 SPO 1997 10 23 00 09 108 5.0 -9 675.00 -58.3 -56.3 -57.4 62 -99 SPO 1997 10 23 00 10 107 5.1 -9 675.00 -58.3 -56.3 -57.3 64 -99 SPO 1997 10 23 00 11 110 5.1 -9 675.00 -58.3 -56.4 -57.4 66 -99 SPO 1997 10 23 00 12 115 5.0 -9 675.00 -58.3 -56.3 -57.5 66 -99 SPO 1997 10 23 00 13 117 5.1 -9 675.00 -58.4 -56.3 -57.7 66 -99 SPO 1997 10 23 00 14 115 5.2 -9 675.00 -58.4 -56.4 -57.7 66 -99 SPO 1997 10 23 00 15 109 5.4 -9 675.00 -58.4 -56.4 -57.6 66 -99 SPO 1997 10 23 00 16 103 5.5 -9 674.90 -58.4 -56.3 -57.4 64 -99 SPO 1997 10 23 00 17 100 5.5 -9 674.90 -58.3 -56.2 -57.2 63 -99 SPO 1997 10 23 00 18 99 5.4 -9 674.90 -58.3 -56.1 -57.2 63 -99 SPO 1997 10 23 00 19 98 5.2 -9 674.90 -58.2 -56.1 -57.1 63 -99 SPO 1997 10 23 00 20 98 5.1 -9 674.90 -58.2 -56.2 -57.1 64 -99 SPO 1997 10 23 00 21 97 5.1 -9 674.90 -58.2 -56.2 -57.1 64 -99 SPO 1997 10 23 00 22 95 5.2 -9 674.90 -58.2 -56.1 -57.1 65 -99 SPO 1997 10 23 00 23 93 5.3 -9 674.90 -58.2 -56.0 -57.1 65 -99 SPO 1997 10 23 00 24 92 5.3 -9 674.90 -58.2 -56.0 -57.1 65 -99 SPO 1997 10 23 00 25 91 5.2 -9 674.90 -58.2 -56.0 -57.2 65 -99 SPO 1997 10 23 00 26 93 5.1 -9 674.90 -58.2 -56.0 -57.2 65 -99 SPO 1997 10 23 00 27 95 5.0 -9 675.00 -58.2 -56.1 -57.4 65 -99 SPO 1997 10 23 00 28 97 5.0 -9 675.00 -58.2 -56.2 -57.5 64 -99 SPO 1997 10 23 00 29 99 4.9 -9 675.00 -58.2 -56.3 -57.5 64 -99 SPO 1997 10 23 00 30 99 5.0 -9 675.00 -58.1 -56.4 -57.5 63 -99 SPO 1997 10 23 00 31 100 4.9 -9 675.00 -58.1 -56.4 -57.5 63 -99 SPO 1997 10 23 00 32 102 5.0 -9 675.00 -58.2 -56.4 -57.6 64 -99 SPO 1997 10 23 00 33 102 5.1 -9 675.00 -58.2 -56.4 -57.7 65 -99 SPO 1997 10 23 00 34 101 4.9 -9 675.00 -58.2 -56.4 -57.7 64 -99 SPO 1997 10 23 00 35 101 5.0 -9 675.00 -58.2 -56.4 -57.7 64 -99 SPO 1997 10 23 00 36 100 5.0 -9 675.00 -58.2 -56.4 -57.6 63 -99 SPO 1997 10 23 00 37 100 4.9 -9 675.00 -58.2 -56.4 -57.6 63 -99 SPO 1997 10 23 00 38 101 4.9 -9 675.00 -58.1 -56.4 -57.6 63 -99 SPO 1997 10 23 00 39 101 4.9 -9 675.10 -58.1 -56.4 -57.7 64 -99 SPO 1997 10 23 00 40 101 5.0 -9 675.00 -58.2 -56.5 -57.8 64 -99 SPO 1997 10 23 00 41 100 4.9 -9 675.00 -58.2 -56.6 -57.8 64 -99 SPO 1997 10 23 00 42 98 5.0 -9 675.00 -58.2 -56.5 -57.6 64 -99 SPO 1997 10 23 00 43 100 4.8 -9 675.10 -58.2 -56.5 -57.4 64 -99 SPO 1997 10 23 00 44 103 4.6 -9 675.10 -58.2 -56.5 -57.4 64 -99 SPO 1997 10 23 00 45 106 4.4 -9 675.10 -58.2 -56.6 -57.3 64 -99 SPO 1997 10 23 00 46 104 4.4 -9 675.10 -58.2 -56.6 -57.4 64 -99 SPO 1997 10 23 00 47 99 4.2 -9 675.10 -58.2 -56.6 -57.2 64 -99 SPO 1997 10 23 00 48 94 4.2 -9 675.10 -58.2 -56.5 -57.1 64 -99 SPO 1997 10 23 00 49 92 4.3 -9 675.10 -58.2 -56.4 -57.0 65 -99 SPO 1997 10 23 00 50 93 4.3 -9 675.10 -58.2 -56.2 -57.0 65 -99 SPO 1997 10 23 00 51 94 4.4 -9 675.10 -58.2 -56.2 -57.0 65 -99 SPO 1997 10 23 00 52 93 4.5 -9 675.10 -58.2 -56.2 -57.0 64 -99 SPO 1997 10 23 00 53 91 4.7 -9 675.10 -58.2 -56.2 -57.0 64 -99 SPO 1997 10 23 00 54 87 4.8 -9 675.10 -58.2 -56.0 -57.0 64 -99 SPO 1997 10 23 00 55 86 4.8 -9 675.00 -58.3 -55.9 -57.1 65 -99 SPO 1997 10 23 00 56 85 4.9 -9 675.00 -58.3 -55.8 -57.1 64 -99 SPO 1997 10 23 00 57 86 5.0 -9 675.00 -58.3 -55.7 -57.1 64 -99 SPO 1997 10 23 00 58 85 5.0 -9 675.00 -58.2 -55.7 -57.1 64 -99 SPO 1997 10 23 00 59 86 5.1 -9 675.00 -58.2 -55.6 -57.0 65 -99 SPO 1997 10 23 01 00 87 5.0 -9 675.00 -58.2 -55.5 -57.0 66 0 SPO 1997 10 23 01 01 87 4.8 -9 675.10 -58.2 -55.5 -57.0 65 -99 SPO 1997 10 23 01 02 87 4.8 -9 675.10 -58.2 -55.6 -56.9 65 -99 SPO 1997 10 23 01 03 88 4.7 -9 675.10 -58.2 -55.6 -56.9 65 -99 SPO 1997 10 23 01 04 89 4.6 -9 675.10 -58.2 -55.7 -56.9 65 -99 SPO 1997 10 23 01 05 90 4.5 -9 675.10 -58.2 -55.7 -56.9 65 -99 SPO 1997 10 23 01 06 91 4.3 -9 675.10 -58.2 -55.8 -56.9 64 -99 SPO 1997 10 23 01 07 91 4.4 -9 675.10 -58.3 -55.9 -56.8 65 -99 SPO 1997 10 23 01 08 90 4.7 -9 675.10 -58.2 -56.0 -56.9 62 -99 SPO 1997 10 23 01 09 89 4.9 -9 675.10 -58.2 -55.9 -56.9 62 -99 SPO 1997 10 23 01 10 88 4.9 -9 675.10 -58.2 -55.9 -56.9 63 -99 SPO 1997 10 23 01 11 87 4.9 -9 675.10 -58.2 -55.9 -56.9 64 -99 SPO 1997 10 23 01 12 85 4.9 -9 675.10 -58.2 -55.9 -56.9 64 -99 SPO 1997 10 23 01 13 83 4.8 -9 675.10 -58.2 -55.8 -56.9 64 -99 SPO 1997 10 23 01 14 82 4.7 -9 675.10 -58.2 -55.8 -57.0 63 -99 SPO 1997 10 23 01 15 82 4.6 -9 675.10 -58.2 -55.8 -57.0 63 -99 SPO 1997 10 23 01 16 84 4.6 -9 675.10 -58.1 -55.7 -56.9 63 -99 SPO 1997 10 23 01 17 84 4.6 -9 675.10 -58.1 -55.6 -56.8 64 -99 SPO 1997 10 23 01 18 83 4.6 -9 675.10 -58.0 -55.7 -56.7 63 -99 SPO 1997 10 23 01 19 84 4.6 -9 675.10 -58.0 -55.7 -56.7 65 -99 SPO 1997 10 23 01 20 84 4.6 -9 675.10 -58.0 -55.6 -56.6 65 -99 SPO 1997 10 23 01 21 85 4.6 -9 675.10 -58.0 -55.6 -56.6 65 -99 SPO 1997 10 23 01 22 86 4.7 -9 675.20 -58.0 -55.5 -56.6 63 -99 SPO 1997 10 23 01 23 87 4.8 -9 675.20 -58.0 -55.5 -56.7 63 -99 SPO 1997 10 23 01 24 87 4.9 -9 675.10 -58.0 -55.6 -56.7 63 -99 SPO 1997 10 23 01 25 85 5.0 -9 675.10 -58.1 -55.6 -56.8 64 -99 SPO 1997 10 23 01 26 84 4.9 -9 675.10 -58.1 -55.7 -56.7 64 -99 SPO 1997 10 23 01 27 82 4.8 -9 675.10 -58.1 -55.7 -56.7 64 -99 SPO 1997 10 23 01 28 82 5.0 -9 675.10 -58.0 -55.7 -56.7 65 -99 SPO 1997 10 23 01 29 81 4.9 -9 675.10 -58.0 -55.6 -56.7 65 -99 SPO 1997 10 23 01 30 81 4.9 -9 675.10 -58.0 -55.6 -56.7 65 -99 SPO 1997 10 23 01 31 82 4.9 -9 675.20 -57.9 -55.6 -56.7 64 -99 SPO 1997 10 23 01 32 83 5.0 -9 675.20 -57.9 -55.6 -56.6 65 -99 SPO 1997 10 23 01 33 85 5.1 -9 675.20 -57.8 -55.5 -56.6 64 -99 SPO 1997 10 23 01 34 86 5.2 -9 675.20 -57.8 -55.4 -56.6 64 -99 SPO 1997 10 23 01 35 86 5.2 -9 675.20 -57.8 -55.4 -56.6 64 -99 SPO 1997 10 23 01 36 86 5.2 -9 675.20 -57.8 -55.3 -56.6 65 -99 SPO 1997 10 23 01 37 86 5.2 -9 675.20 -57.8 -55.3 -56.6 65 -99 SPO 1997 10 23 01 38 87 5.2 -9 675.20 -57.8 -55.3 -56.6 66 -99 SPO 1997 10 23 01 39 88 5.1 -9 675.30 -57.7 -55.4 -56.6 65 -99 SPO 1997 10 23 01 40 90 4.9 -9 675.30 -57.8 -55.5 -56.6 66 -99 SPO 1997 10 23 01 41 93 4.8 -9 675.30 -57.8 -55.6 -56.5 66 -99 SPO 1997 10 23 01 42 93 4.6 -9 675.40 -57.8 -55.7 -56.5 67 -99 SPO 1997 10 23 01 43 91 4.6 -9 675.40 -57.8 -55.8 -56.5 67 -99 SPO 1997 10 23 01 44 89 4.7 -9 675.40 -57.9 -55.8 -56.5 67 -99 SPO 1997 10 23 01 45 88 4.9 -9 675.30 -57.9 -55.7 -56.6 67 -99 SPO 1997 10 23 01 46 88 5.1 -9 675.30 -57.8 -55.6 -56.6 67 -99 SPO 1997 10 23 01 47 88 5.1 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 48 89 5.1 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 49 91 5.1 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 50 91 5.0 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 51 91 5.0 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 52 89 5.0 -9 675.30 -57.8 -55.6 -56.6 66 -99 SPO 1997 10 23 01 53 88 4.9 -9 675.30 -57.8 -55.6 -56.5 66 -99 SPO 1997 10 23 01 54 87 4.8 -9 675.30 -57.8 -55.6 -56.5 66 -99 SPO 1997 10 23 01 55 87 4.7 -9 675.30 -57.8 -55.7 -56.4 66 -99 SPO 1997 10 23 01 56 88 4.5 -9 675.30 -57.8 -55.8 -56.4 66 -99 SPO 1997 10 23 01 57 89 4.3 -9 675.30 -57.9 -56.0 -56.4 67 -99 SPO 1997 10 23 01 58 89 4.4 -9 675.40 -57.9 -56.1 -56.4 67 -99 SPO 1997 10 23 01 59 87 4.4 -9 675.40 -57.9 -56.1 -56.4 66 -99 SPO 1997 10 23 02 00 86 4.5 -9 675.30 -57.9 -56.1 -56.4 66 0 SPO 1997 10 23 02 01 85 4.4 -9 675.30 -58.0 -56.1 -56.4 66 -99 SPO 1997 10 23 02 02 86 4.4 -9 675.40 -58.0 -56.1 -56.4 66 -99 SPO 1997 10 23 02 03 88 4.3 -9 675.40 -58.0 -56.1 -56.4 65 -99 SPO 1997 10 23 02 04 89 4.2 -9 675.40 -58.0 -56.1 -56.4 63 -99 SPO 1997 10 23 02 05 90 4.2 -9 675.40 -58.1 -56.2 -56.4 63 -99 SPO 1997 10 23 02 06 90 4.2 -9 675.40 -58.1 -56.2 -56.4 63 -99 SPO 1997 10 23 02 07 89 4.2 -9 675.40 -58.1 -56.2 -56.4 63 -99 SPO 1997 10 23 02 08 89 4.2 -9 675.40 -58.1 -56.1 -56.4 62 -99 SPO 1997 10 23 02 09 89 4.2 -9 675.30 -58.1 -56.1 -56.4 62 -99 SPO 1997 10 23 02 10 89 4.2 -9 675.30 -58.2 -56.1 -56.4 63 -99 SPO 1997 10 23 02 11 91 4.3 -9 675.40 -58.2 -56.1 -56.5 63 -99 SPO 1997 10 23 02 12 92 4.3 -9 675.40 -58.2 -56.2 -56.6 63 -99 SPO 1997 10 23 02 13 91 4.3 -9 675.40 -58.2 -56.2 -56.6 62 -99 SPO 1997 10 23 02 14 90 4.3 -9 675.30 -58.2 -56.2 -56.6 62 -99 SPO 1997 10 23 02 15 87 4.3 -9 675.30 -58.3 -56.1 -56.5 63 -99 SPO 1997 10 23 02 16 86 4.3 -9 675.30 -58.3 -56.1 -56.5 63 -99 SPO 1997 10 23 02 17 86 4.4 -9 675.30 -58.3 -56.1 -56.6 63 -99 SPO 1997 10 23 02 18 85 4.5 -9 675.30 -58.2 -56.1 -56.6 62 -99 SPO 1997 10 23 02 19 83 4.5 -9 675.30 -58.3 -56.0 -56.6 64 -99 SPO 1997 10 23 02 20 80 4.7 -9 675.20 -58.2 -56.0 -56.6 63 -99 SPO 1997 10 23 02 21 78 4.9 -9 675.20 -58.2 -55.9 -56.7 64 -99 SPO 1997 10 23 02 22 77 5.1 -9 675.20 -58.2 -55.8 -56.8 64 -99 SPO 1997 10 23 02 23 75 5.1 -9 675.20 -58.1 -55.7 -57.0 64 -99 SPO 1997 10 23 02 24 73 5.1 -9 675.20 -58.0 -55.7 -57.0 63 -99 SPO 1997 10 23 02 25 73 5.0 -9 675.10 -58.0 -55.7 -57.0 63 -99 SPO 1997 10 23 02 26 73 4.9 -9 675.20 -58.0 -55.7 -57.0 62 -99 SPO 1997 10 23 02 27 73 4.8 -9 675.20 -57.9 -55.7 -56.9 61 -99 SPO 1997 10 23 02 28 73 4.8 -9 675.20 -57.9 -55.7 -56.9 61 -99 SPO 1997 10 23 02 29 73 4.8 -9 675.20 -57.9 -55.7 -56.8 62 -99 SPO 1997 10 23 02 30 74 4.9 -9 675.20 -57.9 -55.6 -56.8 64 -99 SPO 1997 10 23 02 31 73 4.8 -9 675.30 -58.0 -55.6 -56.8 65 -99 SPO 1997 10 23 02 32 72 4.6 -9 675.30 -58.0 -55.6 -56.8 65 -99 SPO 1997 10 23 02 33 73 4.7 -9 675.40 -58.0 -55.6 -56.8 66 -99 SPO 1997 10 23 02 34 75 4.7 -9 675.40 -58.0 -55.6 -56.7 66 -99 SPO 1997 10 23 02 35 77 4.7 -9 675.40 -58.0 -55.6 -56.6 66 -99 SPO 1997 10 23 02 36 78 4.4 -9 675.40 -58.0 -55.6 -56.5 66 -99 SPO 1997 10 23 02 37 79 4.3 -9 675.30 -58.0 -55.6 -56.4 66 -99 SPO 1997 10 23 02 38 82 4.1 -9 675.40 -58.0 -55.6 -56.3 65 -99 SPO 1997 10 23 02 39 85 4.1 -9 675.40 -57.9 -55.7 -56.3 64 -99 SPO 1997 10 23 02 40 87 4.2 -9 675.40 -57.9 -55.7 -56.3 62 -99 SPO 1997 10 23 02 41 87 4.2 -9 675.40 -58.0 -55.7 -56.4 63 -99 SPO 1997 10 23 02 42 87 4.3 -9 675.40 -58.0 -55.7 -56.4 62 -99 SPO 1997 10 23 02 43 86 4.3 -9 675.40 -58.0 -55.7 -56.4 62 -99 SPO 1997 10 23 02 44 84 4.5 -9 675.40 -58.1 -55.8 -56.4 64 -99 SPO 1997 10 23 02 45 83 4.7 -9 675.40 -58.2 -55.8 -56.5 65 -99 SPO 1997 10 23 02 46 83 4.8 -9 675.40 -58.2 -55.6 -56.6 65 -99 SPO 1997 10 23 02 47 83 4.9 -9 675.40 -58.2 -55.6 -56.6 65 -99 SPO 1997 10 23 02 48 83 4.9 -9 675.40 -58.2 -55.5 -56.7 64 -99 SPO 1997 10 23 02 49 84 4.9 -9 675.50 -58.2 -55.5 -56.7 64 -99 SPO 1997 10 23 02 50 84 4.8 -9 675.50 -58.2 -55.5 -56.7 64 -99 SPO 1997 10 23 02 51 84 4.8 -9 675.50 -58.2 -55.5 -56.7 63 -99 SPO 1997 10 23 02 52 85 4.8 -9 675.50 -58.2 -55.5 -56.7 63 -99 SPO 1997 10 23 02 53 86 4.8 -9 675.50 -58.3 -55.5 -56.7 64 -99 SPO 1997 10 23 02 54 87 4.6 -9 675.50 -58.3 -55.5 -56.7 65 -99 SPO 1997 10 23 02 55 88 4.6 -9 675.50 -58.2 -55.5 -56.7 65 -99 SPO 1997 10 23 02 56 90 4.6 -9 675.50 -58.2 -55.6 -56.7 66 -99 SPO 1997 10 23 02 57 91 4.4 -9 675.50 -58.2 -55.6 -56.8 66 -99 SPO 1997 10 23 02 58 91 4.2 -9 675.50 -58.2 -55.6 -56.8 66 -99 SPO 1997 10 23 02 59 92 4.1 -9 675.50 -58.2 -55.7 -56.8 65 -99 SPO 1997 10 23 03 00 92 4.1 -9 675.50 -58.3 -55.8 -56.9 66 0 SPO 1997 10 23 03 01 92 4.1 -9 675.50 -58.3 -55.8 -56.8 65 -99 SPO 1997 10 23 03 02 91 4.0 -9 675.50 -58.2 -55.8 -56.6 65 -99 SPO 1997 10 23 03 03 88 3.8 -9 675.50 -58.2 -55.8 -56.4 64 -99 SPO 1997 10 23 03 04 87 3.7 -9 675.60 -58.2 -55.8 -56.3 65 -99 SPO 1997 10 23 03 05 86 3.6 -9 675.60 -58.2 -55.8 -56.2 65 -99 SPO 1997 10 23 03 06 87 3.5 -9 675.60 -58.2 -55.8 -56.1 65 -99 SPO 1997 10 23 03 07 90 3.3 -9 675.60 -58.1 -55.8 -56.0 64 -99 SPO 1997 10 23 03 08 93 3.2 -9 675.70 -58.2 -55.8 -56.0 66 -99 SPO 1997 10 23 03 09 96 3.3 -9 675.70 -58.1 -55.9 -56.2 66 -99 SPO 1997 10 23 03 10 94 3.6 -9 675.70 -58.1 -55.9 -56.4 66 -99 SPO 1997 10 23 03 11 92 3.7 -9 675.70 -58.1 -55.8 -56.4 66 -99 SPO 1997 10 23 03 12 89 3.8 -9 675.70 -58.2 -55.7 -56.2 66 -99 SPO 1997 10 23 03 13 89 3.7 -9 675.80 -58.2 -55.7 -56.1 65 -99 SPO 1997 10 23 03 14 91 3.7 -9 675.80 -58.3 -55.8 -56.1 67 -99 SPO 1997 10 23 03 15 93 3.7 -9 675.80 -58.3 -55.8 -56.4 68 -99 SPO 1997 10 23 03 16 95 3.7 -9 675.80 -58.2 -55.8 -56.7 67 -99 SPO 1997 10 23 03 17 95 3.9 -9 675.80 -58.2 -55.8 -56.8 66 -99 SPO 1997 10 23 03 18 93 4.1 -9 675.80 -58.1 -55.8 -56.7 66 -99 SPO 1997 10 23 03 19 91 4.2 -9 675.80 -58.1 -55.7 -56.6 66 -99 SPO 1997 10 23 03 20 90 4.4 -9 675.80 -58.1 -55.6 -56.4 66 -99 SPO 1997 10 23 03 21 91 4.5 -9 675.80 -58.0 -55.6 -56.3 66 -99 SPO 1997 10 23 03 22 93 4.5 -9 675.80 -58.0 -55.6 -56.3 66 -99 SPO 1997 10 23 03 23 92 4.6 -9 675.80 -58.0 -55.5 -56.4 66 -99 SPO 1997 10 23 03 24 91 4.8 -9 675.70 -58.0 -55.5 -56.4 66 -99 SPO 1997 10 23 03 25 92 4.7 -9 675.70 -57.9 -55.5 -56.4 67 -99 SPO 1997 10 23 03 26 95 4.7 -9 675.70 -58.0 -55.6 -56.4 -99 -99 SPO 1997 10 23 03 27 100 4.5 -9 675.80 -57.9 -55.6 -56.6 -99 -99 SPO 1997 10 23 03 28 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 29 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 30 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 31 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 32 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 33 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 34 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 35 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 36 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 37 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 23 03 38 -999 -99.9 -9 675.80 -57.9 -55.9 -56.7 -99 -99 SPO 1997 10 23 03 39 102 4.0 -9 675.80 -57.9 -55.9 -56.6 -99 -99 SPO 1997 10 23 03 40 101 4.0 -9 675.80 -57.8 -55.9 -56.4 66 -99 SPO 1997 10 23 03 41 101 4.1 -9 675.80 -57.9 -56.0 -56.4 67 -99 SPO 1997 10 23 03 42 99 4.1 -9 675.80 -57.8 -56.0 -56.4 65 -99 SPO 1997 10 23 03 43 99 4.2 -9 675.80 -57.8 -56.0 -56.3 65 -99 SPO 1997 10 23 03 44 99 4.2 -9 675.80 -57.8 -56.0 -56.3 64 -99 SPO 1997 10 23 03 45 99 4.3 -9 675.70 -57.8 -56.1 -56.3 64 -99 SPO 1997 10 23 03 46 98 4.3 -9 675.70 -57.8 -56.1 -56.3 65 -99 SPO 1997 10 23 03 47 97 4.3 -9 675.70 -57.9 -56.1 -56.3 67 -99 SPO 1997 10 23 03 48 97 4.3 -9 675.70 -57.9 -56.0 -56.3 67 -99 SPO 1997 10 23 03 49 98 4.3 -9 675.80 -57.9 -56.0 -56.4 67 -99 SPO 1997 10 23 03 50 100 4.2 -9 675.80 -57.9 -56.0 -56.4 68 -99 SPO 1997 10 23 03 51 102 4.2 -9 675.80 -57.9 -56.0 -56.6 68 -99 SPO 1997 10 23 03 52 101 4.4 -9 675.80 -57.9 -56.0 -56.7 67 -99 SPO 1997 10 23 03 53 99 4.5 -9 675.80 -58.0 -56.0 -56.6 68 -99 SPO 1997 10 23 03 54 96 4.8 -9 675.80 -57.9 -55.9 -56.5 67 -99 SPO 1997 10 23 03 55 92 5.0 -9 675.80 -58.0 -55.8 -56.5 66 -99 SPO 1997 10 23 03 56 90 5.1 -9 675.70 -57.9 -55.6 -56.5 66 -99 SPO 1997 10 23 03 57 89 5.2 -9 675.70 -57.9 -55.4 -56.5 66 -99 SPO 1997 10 23 03 58 88 5.2 -9 675.70 -57.8 -55.4 -56.4 65 -99 SPO 1997 10 23 03 59 89 5.1 -9 675.70 -57.8 -55.4 -56.4 66 -99 SPO 1997 10 23 04 00 90 4.8 -9 675.80 -57.8 -55.4 -56.3 66 0 SPO 1997 10 23 04 01 91 4.6 -9 675.80 -57.7 -55.5 -56.3 65 -99 SPO 1997 10 23 04 02 91 4.4 -9 675.80 -57.7 -55.6 -56.2 66 -99 SPO 1997 10 23 04 03 91 4.2 -9 675.80 -57.7 -55.7 -56.2 67 -99 SPO 1997 10 23 04 04 88 4.3 -9 675.80 -57.8 -55.8 -56.2 67 -99 SPO 1997 10 23 04 05 87 4.5 -9 675.80 -57.8 -55.8 -56.2 67 -99 SPO 1997 10 23 04 06 87 4.7 -9 675.80 -57.8 -55.7 -56.3 67 -99 SPO 1997 10 23 04 07 86 4.8 -9 675.80 -57.8 -55.7 -56.3 67 -99 SPO 1997 10 23 04 08 86 4.7 -9 675.80 -57.8 -55.6 -56.3 67 -99 SPO 1997 10 23 04 09 86 4.5 -9 675.80 -57.8 -55.5 -56.3 67 -99 SPO 1997 10 23 04 10 85 4.5 -9 675.80 -57.7 -55.6 -56.3 66 -99 SPO 1997 10 23 04 11 86 4.5 -9 675.80 -57.7 -55.6 -56.3 66 -99 SPO 1997 10 23 04 12 88 4.4 -9 675.80 -57.8 -55.6 -56.2 67 -99 SPO 1997 10 23 04 13 91 4.4 -9 675.80 -57.8 -55.6 -56.2 67 -99 SPO 1997 10 23 04 14 92 4.2 -9 675.80 -57.7 -55.6 -56.2 66 -99 SPO 1997 10 23 04 15 94 4.2 -9 675.80 -57.8 -55.7 -56.3 67 -99 SPO 1997 10 23 04 16 94 4.2 -9 675.80 -57.8 -55.8 -56.3 66 -99 SPO 1997 10 23 04 17 94 4.3 -9 675.80 -57.9 -55.9 -56.3 67 -99 SPO 1997 10 23 04 18 94 4.2 -9 675.80 -58.0 -55.9 -56.3 67 -99 SPO 1997 10 23 04 19 94 4.2 -9 675.80 -58.0 -55.8 -56.4 67 -99 SPO 1997 10 23 04 20 93 4.3 -9 675.80 -58.0 -55.8 -56.4 66 -99 SPO 1997 10 23 04 21 93 4.4 -9 675.80 -58.1 -55.8 -56.5 66 -99 SPO 1997 10 23 04 22 93 4.5 -9 675.80 -58.1 -55.8 -56.5 66 -99 SPO 1997 10 23 04 23 91 4.6 -9 675.80 -58.2 -55.8 -56.6 65 -99 SPO 1997 10 23 04 24 89 4.8 -9 675.70 -58.2 -55.7 -56.6 65 -99 SPO 1997 10 23 04 25 88 4.9 -9 675.70 -58.2 -55.7 -56.6 65 -99 SPO 1997 10 23 04 26 88 4.9 -9 675.70 -58.2 -55.6 -56.7 65 -99 SPO 1997 10 23 04 27 88 4.8 -9 675.70 -58.1 -55.6 -56.7 64 -99 SPO 1997 10 23 04 28 88 4.8 -9 675.70 -58.1 -55.7 -56.7 64 -99 SPO 1997 10 23 04 29 88 4.6 -9 675.70 -58.2 -55.7 -56.7 66 -99 SPO 1997 10 23 04 30 87 4.7 -9 675.70 -58.1 -55.8 -56.7 66 -99 SPO 1997 10 23 04 31 86 4.8 -9 675.70 -58.1 -55.8 -56.8 66 -99 SPO 1997 10 23 04 32 83 5.0 -9 675.70 -58.1 -55.8 -56.8 66 -99 SPO 1997 10 23 04 33 82 5.0 -9 675.70 -58.1 -55.7 -56.9 66 -99 SPO 1997 10 23 04 34 81 5.0 -9 675.70 -58.1 -55.6 -57.0 64 -99 SPO 1997 10 23 04 35 82 5.0 -9 675.70 -58.1 -55.5 -57.0 64 -99 SPO 1997 10 23 04 36 82 5.0 -9 675.70 -58.1 -55.5 -57.0 63 -99 SPO 1997 10 23 04 37 81 4.9 -9 675.70 -58.0 -55.4 -57.0 62 -99 SPO 1997 10 23 04 38 80 4.6 -9 675.70 -58.0 -55.4 -57.0 63 -99 SPO 1997 10 23 04 39 77 4.3 -9 675.80 -58.0 -55.4 -57.0 63 -99 SPO 1997 10 23 04 40 76 3.9 -9 675.80 -58.0 -55.5 -57.0 65 -99 SPO 1997 10 23 04 41 76 3.2 -9 675.80 -58.0 -55.6 -57.0 65 -99 SPO 1997 10 23 04 42 77 2.5 -9 675.80 -58.1 -55.8 -56.8 66 -99 SPO 1997 10 23 04 43 84 1.9 -9 675.90 -58.1 -56.0 -56.3 66 -99 SPO 1997 10 23 04 44 93 1.4 -9 676.00 -57.9 -56.2 -56.0 66 -99 SPO 1997 10 23 04 45 99 1.2 -9 676.00 -57.7 -56.4 -55.6 65 -99 SPO 1997 10 23 04 46 92 1.1 -9 676.00 -57.7 -56.5 -55.4 67 -99 SPO 1997 10 23 04 47 91 1.4 -9 676.10 -57.8 -56.5 -55.2 68 -99 SPO 1997 10 23 04 48 93 1.7 -9 676.10 -57.8 -56.5 -55.1 70 -99 SPO 1997 10 23 04 49 102 1.8 -9 676.10 -57.8 -56.5 -55.4 70 -99 SPO 1997 10 23 04 50 107 1.9 -9 676.10 -57.8 -56.5 -56.0 69 -99 SPO 1997 10 23 04 51 103 2.4 -9 676.10 -57.8 -56.4 -56.4 69 -99 SPO 1997 10 23 04 52 96 2.8 -9 676.00 -57.9 -56.3 -56.5 70 -99 SPO 1997 10 23 04 53 91 3.2 -9 676.00 -57.9 -56.1 -56.2 70 -99 SPO 1997 10 23 04 54 89 3.5 -9 676.00 -58.0 -55.9 -56.0 70 -99 SPO 1997 10 23 04 55 90 3.5 -9 676.00 -58.0 -55.8 -56.0 70 -99 SPO 1997 10 23 04 56 91 3.5 -9 676.00 -58.0 -55.7 -56.2 69 -99 SPO 1997 10 23 04 57 93 3.6 -9 676.00 -58.1 -55.8 -56.2 69 -99 SPO 1997 10 23 04 58 91 3.7 -9 676.00 -58.1 -55.9 -56.3 69 -99 SPO 1997 10 23 04 59 86 3.9 -9 676.00 -58.2 -55.9 -56.3 69 -99 SPO 1997 10 23 05 00 83 4.2 -9 676.00 -58.1 -55.8 -56.4 67 0 SPO 1997 10 23 05 01 81 4.3 -9 676.00 -58.1 -55.6 -56.4 66 -99 SPO 1997 10 23 05 02 80 4.4 -9 676.00 -58.1 -55.4 -56.5 66 -99 SPO 1997 10 23 05 03 80 4.3 -9 676.00 -58.1 -55.3 -56.6 66 -99 SPO 1997 10 23 05 04 81 4.2 -9 676.00 -58.1 -55.3 -56.6 66 -99 SPO 1997 10 23 05 05 81 4.1 -9 676.00 -58.1 -55.3 -56.6 66 -99 SPO 1997 10 23 05 06 81 4.2 -9 676.00 -58.1 -55.3 -56.5 66 -99 SPO 1997 10 23 05 07 80 4.2 -9 676.00 -58.1 -55.2 -56.6 66 -99 SPO 1997 10 23 05 08 79 4.2 -9 676.00 -58.1 -55.2 -56.8 66 -99 SPO 1997 10 23 05 09 78 4.2 -9 676.00 -58.1 -55.2 -56.9 67 -99 SPO 1997 10 23 05 10 79 4.1 -9 676.00 -58.1 -55.0 -56.9 66 -99 SPO 1997 10 23 05 11 81 4.0 -9 676.10 -58.1 -55.0 -56.9 66 -99 SPO 1997 10 23 05 12 83 3.9 -9 676.10 -58.1 -55.0 -56.7 66 -99 SPO 1997 10 23 05 13 84 4.0 -9 676.10 -58.1 -55.0 -56.6 64 -99 SPO 1997 10 23 05 14 82 4.0 -9 676.10 -58.1 -54.9 -56.5 64 -99 SPO 1997 10 23 05 15 80 4.2 -9 676.00 -58.1 -54.9 -56.6 66 -99 SPO 1997 10 23 05 16 77 4.2 -9 676.00 -58.1 -54.8 -56.8 64 -99 SPO 1997 10 23 05 17 75 4.0 -9 676.00 -58.1 -54.8 -57.0 64 -99 SPO 1997 10 23 05 18 73 3.9 -9 676.00 -58.2 -54.8 -57.1 64 -99 SPO 1997 10 23 05 19 73 3.6 -9 676.00 -58.2 -55.0 -57.0 64 -99 SPO 1997 10 23 05 20 75 3.5 -9 676.00 -58.1 -55.1 -57.0 63 -99 SPO 1997 10 23 05 21 75 3.4 -9 676.00 -58.1 -55.1 -56.8 64 -99 SPO 1997 10 23 05 22 74 3.3 -9 676.00 -58.2 -55.2 -56.8 66 -99 SPO 1997 10 23 05 23 72 3.3 -9 676.00 -58.2 -55.2 -56.8 66 -99 SPO 1997 10 23 05 24 69 3.5 -9 676.00 -58.2 -55.1 -57.0 66 -99 SPO 1997 10 23 05 25 67 3.7 -9 676.00 -58.2 -55.0 -57.1 66 -99 SPO 1997 10 23 05 26 65 3.9 -9 675.90 -58.2 -54.8 -57.2 66 -99 SPO 1997 10 23 05 27 65 3.8 -9 675.90 -58.2 -54.8 -57.2 66 -99 SPO 1997 10 23 05 28 64 3.8 -9 676.00 -58.2 -54.7 -57.2 66 -99 SPO 1997 10 23 05 29 64 3.8 -9 675.90 -58.2 -54.6 -57.2 66 -99 SPO 1997 10 23 05 30 64 3.9 -9 676.00 -58.2 -54.6 -57.2 66 -99 SPO 1997 10 23 05 31 63 3.9 -9 675.90 -58.1 -54.4 -57.2 66 -99 SPO 1997 10 23 05 32 63 4.2 -9 675.90 -58.1 -54.3 -57.2 66 -99 SPO 1997 10 23 05 33 62 4.3 -9 675.90 -58.0 -54.2 -57.3 63 -99 SPO 1997 10 23 05 34 61 4.4 -9 675.90 -58.0 -54.1 -57.2 63 -99 SPO 1997 10 23 05 35 61 4.3 -9 675.90 -57.9 -54.1 -57.2 64 -99 SPO 1997 10 23 05 36 63 4.3 -9 675.90 -57.8 -54.1 -57.1 63 -99 SPO 1997 10 23 05 37 62 4.1 -9 676.00 -57.8 -54.1 -57.0 65 -99 SPO 1997 10 23 05 38 63 3.9 -9 676.00 -57.8 -54.2 -57.0 66 -99 SPO 1997 10 23 05 39 63 4.0 -9 676.00 -57.7 -54.2 -56.9 65 -99 SPO 1997 10 23 05 40 63 4.2 -9 676.00 -57.7 -54.3 -56.9 65 -99 SPO 1997 10 23 05 41 61 4.2 -9 676.00 -57.6 -54.3 -56.9 65 -99 SPO 1997 10 23 05 42 61 4.3 -9 676.00 -57.6 -54.4 -56.9 65 -99 SPO 1997 10 23 05 43 60 4.5 -9 676.00 -57.5 -54.4 -56.8 65 -99 SPO 1997 10 23 05 44 60 4.8 -9 675.90 -57.4 -54.3 -56.8 64 -99 SPO 1997 10 23 05 45 61 4.8 -9 675.90 -57.3 -54.3 -56.7 63 -99 SPO 1997 10 23 05 46 62 4.7 -9 676.00 -57.2 -54.3 -56.7 63 -99 SPO 1997 10 23 05 47 63 4.6 -9 676.00 -57.2 -54.2 -56.6 63 -99 SPO 1997 10 23 05 48 63 4.4 -9 676.00 -57.2 -54.3 -56.6 64 -99 SPO 1997 10 23 05 49 64 4.4 -9 676.00 -57.2 -54.4 -56.6 65 -99 SPO 1997 10 23 05 50 65 4.3 -9 676.10 -57.2 -54.4 -56.6 66 -99 SPO 1997 10 23 05 51 67 4.1 -9 676.10 -57.2 -54.4 -56.6 66 -99 SPO 1997 10 23 05 52 68 4.0 -9 676.10 -57.2 -54.4 -56.6 66 -99 SPO 1997 10 23 05 53 70 3.9 -9 676.10 -57.3 -54.4 -56.5 67 -99 SPO 1997 10 23 05 54 71 3.6 -9 676.10 -57.3 -54.5 -56.5 66 -99 SPO 1997 10 23 05 55 72 3.4 -9 676.10 -57.4 -54.6 -56.4 67 -99 SPO 1997 10 23 05 56 73 3.3 -9 676.20 -57.4 -54.9 -56.4 67 -99 SPO 1997 10 23 05 57 76 3.3 -9 676.20 -57.5 -55.1 -56.2 67 -99 SPO 1997 10 23 05 58 81 3.2 -9 676.20 -57.6 -55.4 -56.0 67 -99 SPO 1997 10 23 05 59 85 3.1 -9 676.20 -57.6 -55.6 -56.0 66 -99 SPO 1997 10 23 06 00 88 3.0 -9 676.20 -57.8 -55.8 -56.1 67 0 SPO 1997 10 23 06 01 90 2.8 -9 676.10 -57.8 -56.0 -56.2 66 -99 SPO 1997 10 23 06 02 92 2.7 -9 676.10 -58.0 -56.1 -56.4 66 -99 SPO 1997 10 23 06 03 92 2.7 -9 676.10 -58.1 -56.0 -56.6 67 -99 SPO 1997 10 23 06 04 89 2.8 -9 676.10 -58.2 -56.0 -56.7 67 -99 SPO 1997 10 23 06 05 86 3.0 -9 676.10 -58.2 -55.9 -56.6 66 -99 SPO 1997 10 23 06 06 83 3.2 -9 676.10 -58.4 -55.8 -56.4 66 -99 SPO 1997 10 23 06 07 82 3.2 -9 676.10 -58.4 -55.7 -56.2 66 -99 SPO 1997 10 23 06 08 81 3.2 -9 676.10 -58.5 -55.6 -56.1 66 -99 SPO 1997 10 23 06 09 82 3.0 -9 676.10 -58.6 -55.5 -56.1 66 -99 SPO 1997 10 23 06 10 86 2.8 -9 676.10 -58.6 -55.6 -56.2 65 -99 SPO 1997 10 23 06 11 89 2.9 -9 676.10 -58.6 -55.7 -56.6 65 -99 SPO 1997 10 23 06 12 90 3.0 -9 676.10 -58.6 -55.7 -56.9 64 -99 SPO 1997 10 23 06 13 90 3.2 -9 676.10 -58.6 -55.7 -57.0 64 -99 SPO 1997 10 23 06 14 89 3.4 -9 676.10 -58.6 -55.7 -56.9 64 -99 SPO 1997 10 23 06 15 89 3.4 -9 676.10 -58.6 -55.6 -56.8 64 -99 SPO 1997 10 23 06 16 91 3.4 -9 676.10 -58.6 -55.6 -56.8 64 -99 SPO 1997 10 23 06 17 94 3.2 -9 676.20 -58.5 -55.6 -56.9 63 -99 SPO 1997 10 23 06 18 97 3.1 -9 676.20 -58.5 -55.6 -57.1 64 -99 SPO 1997 10 23 06 19 99 3.1 -9 676.20 -58.4 -55.6 -57.0 64 -99 SPO 1997 10 23 06 20 97 3.2 -9 676.20 -58.2 -55.6 -56.9 63 -99 SPO 1997 10 23 06 21 92 3.3 -9 676.20 -58.0 -55.4 -56.8 62 -99 SPO 1997 10 23 06 22 88 3.4 -9 676.20 -58.0 -55.2 -56.4 65 -99 SPO 1997 10 23 06 23 83 3.7 -9 676.20 -57.9 -54.9 -56.0 65 -99 SPO 1997 10 23 06 24 79 3.9 -9 676.10 -57.9 -54.7 -55.8 66 -99 SPO 1997 10 23 06 25 77 4.0 -9 676.10 -58.0 -54.6 -55.8 66 -99 SPO 1997 10 23 06 26 75 4.0 -9 676.10 -58.0 -54.5 -56.0 66 -99 SPO 1997 10 23 06 27 75 4.0 -9 676.10 -57.9 -54.5 -56.0 66 -99 SPO 1997 10 23 06 28 76 3.9 -9 676.10 -58.0 -54.6 -56.0 66 -99 SPO 1997 10 23 06 29 78 3.8 -9 676.10 -58.0 -54.6 -55.8 66 -99 SPO 1997 10 23 06 30 79 3.8 -9 676.10 -57.9 -54.7 -55.7 66 -99 SPO 1997 10 23 06 31 79 3.9 -9 676.10 -57.9 -54.7 -55.7 66 -99 SPO 1997 10 23 06 32 78 4.0 -9 676.20 -57.9 -54.5 -55.7 67 -99 SPO 1997 10 23 06 33 78 4.0 -9 676.20 -57.9 -54.4 -55.7 67 -99 SPO 1997 10 23 06 34 79 4.0 -9 676.20 -57.9 -54.3 -55.6 67 -99 SPO 1997 10 23 06 35 81 3.8 -9 676.20 -57.9 -54.3 -55.5 67 -99 SPO 1997 10 23 06 36 86 3.6 -9 676.30 -57.9 -54.4 -55.6 67 -99 SPO 1997 10 23 06 37 93 3.4 -9 676.30 -57.8 -54.4 -56.0 67 -99 SPO 1997 10 23 06 38 101 3.1 -9 676.30 -57.8 -54.6 -56.5 66 -99 SPO 1997 10 23 06 39 105 3.1 -9 676.30 -57.7 -54.7 -56.6 65 -99 SPO 1997 10 23 06 40 103 3.2 -9 676.30 -57.6 -54.7 -56.5 65 -99 SPO 1997 10 23 06 41 101 3.3 -9 676.30 -57.7 -54.7 -56.7 66 -99 SPO 1997 10 23 06 42 103 3.3 -9 676.30 -58.0 -54.7 -56.8 67 -99 SPO 1997 10 23 06 43 105 3.4 -9 676.30 -58.0 -54.8 -56.9 66 -99 SPO 1997 10 23 06 44 103 3.5 -9 676.30 -58.1 -54.8 -57.0 67 -99 SPO 1997 10 23 06 45 98 3.7 -9 676.30 -58.0 -54.8 -57.0 66 -99 SPO 1997 10 23 06 46 93 4.0 -9 676.30 -58.0 -54.6 -56.8 66 -99 SPO 1997 10 23 06 47 91 4.1 -9 676.20 -58.0 -54.5 -56.4 66 -99 SPO 1997 10 23 06 48 92 4.0 -9 676.20 -58.0 -54.4 -56.2 66 -99 SPO 1997 10 23 06 49 95 4.0 -9 676.20 -58.0 -54.5 -56.4 66 -99 SPO 1997 10 23 06 50 98 3.9 -9 676.20 -58.1 -54.6 -56.7 66 -99 SPO 1997 10 23 06 51 99 3.8 -9 676.20 -58.2 -54.7 -56.8 67 -99 SPO 1997 10 23 06 52 95 3.9 -9 676.20 -58.2 -54.8 -56.6 66 -99 SPO 1997 10 23 06 53 90 3.9 -9 676.20 -58.1 -54.7 -56.3 66 -99 SPO 1997 10 23 06 54 86 4.0 -9 676.20 -58.1 -54.5 -56.1 66 -99 SPO 1997 10 23 06 55 83 4.1 -9 676.20 -58.0 -54.5 -56.0 65 -99 SPO 1997 10 23 06 56 82 4.1 -9 676.20 -57.9 -54.5 -56.0 64 -99 SPO 1997 10 23 06 57 83 4.0 -9 676.20 -57.8 -54.5 -55.9 63 -99 SPO 1997 10 23 06 58 84 3.9 -9 676.20 -57.8 -54.6 -55.9 64 -99 SPO 1997 10 23 06 59 85 3.8 -9 676.20 -57.8 -54.6 -55.8 65 -99 SPO 1997 10 23 07 00 86 3.6 -9 676.30 -57.8 -54.7 -55.7 66 0 SPO 1997 10 23 07 01 86 3.7 -9 676.30 -57.8 -54.9 -55.6 67 -99 SPO 1997 10 23 07 02 85 3.7 -9 676.30 -57.8 -55.0 -55.6 67 -99 SPO 1997 10 23 07 03 84 3.8 -9 676.30 -57.7 -54.9 -55.6 66 -99 SPO 1997 10 23 07 04 84 3.8 -9 676.30 -57.8 -54.8 -55.6 67 -99 SPO 1997 10 23 07 05 85 3.9 -9 676.30 -57.8 -54.6 -55.6 67 -99 SPO 1997 10 23 07 06 86 3.9 -9 676.30 -57.8 -54.4 -55.6 67 -99 SPO 1997 10 23 07 07 87 3.9 -9 676.30 -57.8 -54.4 -55.6 67 -99 SPO 1997 10 23 07 08 86 3.9 -9 676.30 -57.8 -54.4 -55.6 67 -99 SPO 1997 10 23 07 09 85 3.8 -9 676.30 -57.8 -54.4 -55.6 66 -99 SPO 1997 10 23 07 10 83 4.1 -9 676.30 -57.7 -54.3 -55.6 65 -99 SPO 1997 10 23 07 11 82 4.2 -9 676.30 -57.7 -54.2 -55.6 65 -99 SPO 1997 10 23 07 12 81 4.4 -9 676.30 -57.7 -54.2 -55.8 66 -99 SPO 1997 10 23 07 13 80 4.4 -9 676.30 -57.7 -54.0 -56.0 66 -99 SPO 1997 10 23 07 14 79 4.5 -9 676.30 -57.7 -53.9 -56.1 66 -99 SPO 1997 10 23 07 15 80 4.4 -9 676.30 -57.7 -53.8 -56.1 66 -99 SPO 1997 10 23 07 16 82 4.3 -9 676.30 -57.7 -54.0 -56.0 66 -99 SPO 1997 10 23 07 17 84 4.3 -9 676.30 -57.8 -54.2 -55.8 67 -99 SPO 1997 10 23 07 18 85 4.1 -9 676.30 -57.8 -54.5 -55.8 67 -99 SPO 1997 10 23 07 19 85 3.9 -9 676.30 -57.8 -54.8 -55.8 67 -99 SPO 1997 10 23 07 20 86 3.7 -9 676.30 -57.8 -55.0 -55.7 67 -99 SPO 1997 10 23 07 21 87 3.6 -9 676.40 -57.9 -55.2 -55.6 67 -99 SPO 1997 10 23 07 22 86 3.5 -9 676.40 -57.9 -55.3 -55.6 67 -99 SPO 1997 10 23 07 23 85 3.5 -9 676.40 -57.9 -55.2 -55.5 66 -99 SPO 1997 10 23 07 24 83 3.6 -9 676.40 -57.9 -55.0 -55.4 66 -99 SPO 1997 10 23 07 25 82 3.6 -9 676.40 -57.9 -55.0 -55.4 66 -99 SPO 1997 10 23 07 26 81 3.6 -9 676.40 -57.9 -55.0 -55.3 66 -99 SPO 1997 10 23 07 27 79 3.6 -9 676.40 -57.9 -54.9 -55.4 67 -99 SPO 1997 10 23 07 28 78 3.6 -9 676.40 -57.9 -54.9 -55.5 67 -99 SPO 1997 10 23 07 29 78 3.4 -9 676.40 -57.8 -54.8 -55.4 67 -99 SPO 1997 10 23 07 30 79 3.2 -9 676.50 -57.8 -54.8 -55.2 67 -99 SPO 1997 10 23 07 31 82 3.0 -9 676.50 -57.9 -54.8 -54.9 67 -99 SPO 1997 10 23 07 32 82 2.9 -9 676.50 -57.8 -55.0 -54.8 67 -99 SPO 1997 10 23 07 33 80 2.9 -9 676.50 -57.8 -55.0 -54.7 67 -99 SPO 1997 10 23 07 34 78 3.0 -9 676.50 -57.8 -55.0 -54.6 67 -99 SPO 1997 10 23 07 35 76 3.1 -9 676.50 -57.8 -54.8 -54.5 67 -99 SPO 1997 10 23 07 36 76 3.2 -9 676.50 -57.8 -54.7 -54.5 67 -99 SPO 1997 10 23 07 37 76 3.1 -9 676.50 -57.8 -54.7 -54.5 68 -99 SPO 1997 10 23 07 38 77 3.0 -9 676.50 -57.8 -54.8 -54.4 68 -99 SPO 1997 10 23 07 39 78 3.0 -9 676.60 -57.8 -54.9 -54.4 67 -99 SPO 1997 10 23 07 40 81 3.0 -9 676.60 -57.8 -54.9 -54.4 67 -99 SPO 1997 10 23 07 41 85 2.9 -9 676.60 -57.8 -55.0 -54.7 67 -99 SPO 1997 10 23 07 42 90 2.7 -9 676.60 -57.8 -55.0 -55.3 67 -99 SPO 1997 10 23 07 43 94 2.5 -9 676.70 -57.7 -55.0 -55.7 67 -99 SPO 1997 10 23 07 44 95 2.5 -9 676.70 -57.6 -55.0 -55.9 67 -99 SPO 1997 10 23 07 45 93 2.8 -9 676.70 -57.5 -54.9 -55.9 66 -99 SPO 1997 10 23 07 46 89 3.0 -9 676.70 -57.4 -54.7 -55.7 66 -99 SPO 1997 10 23 07 47 87 3.1 -9 676.60 -57.4 -54.5 -55.3 66 -99 SPO 1997 10 23 07 48 86 3.1 -9 676.60 -57.6 -54.3 -55.3 67 -99 SPO 1997 10 23 07 49 86 3.1 -9 676.60 -57.8 -54.3 -55.2 68 -99 SPO 1997 10 23 07 50 85 3.3 -9 676.60 -57.6 -54.4 -55.1 67 -99 SPO 1997 10 23 07 51 82 3.4 -9 676.60 -57.6 -54.2 -55.0 67 -99 SPO 1997 10 23 07 52 80 3.4 -9 676.60 -57.7 -54.1 -55.0 67 -99 SPO 1997 10 23 07 53 80 3.4 -9 676.60 -57.9 -54.1 -55.1 67 -99 SPO 1997 10 23 07 54 82 3.3 -9 676.60 -58.0 -54.2 -55.1 67 -99 SPO 1997 10 23 07 55 87 3.1 -9 676.70 -58.0 -54.3 -55.5 66 -99 SPO 1997 10 23 07 56 94 2.9 -9 676.70 -58.0 -54.5 -56.0 66 -99 SPO 1997 10 23 07 57 101 2.7 -9 676.80 -57.7 -54.7 -56.2 64 -99 SPO 1997 10 23 07 58 106 2.6 -9 676.80 -57.4 -54.8 -56.0 63 -99 SPO 1997 10 23 07 59 105 2.6 -9 676.80 -57.2 -54.9 -55.9 63 -99 SPO 1997 10 23 08 00 102 2.6 -9 676.80 -57.0 -54.9 -55.8 63 0 SPO 1997 10 23 08 01 99 2.7 -9 676.80 -57.0 -54.8 -55.8 65 -99 SPO 1997 10 23 08 02 98 2.8 -9 676.80 -56.9 -54.6 -55.7 64 -99 SPO 1997 10 23 08 03 98 2.7 -9 676.80 -56.9 -54.6 -55.7 66 -99 SPO 1997 10 23 08 04 96 2.7 -9 676.80 -56.9 -54.6 -55.6 66 -99 SPO 1997 10 23 08 05 95 2.7 -9 676.80 -56.9 -54.7 -55.6 67 -99 SPO 1997 10 23 08 06 97 2.7 -9 676.80 -57.0 -54.7 -55.6 67 -99 SPO 1997 10 23 08 07 98 2.7 -9 676.80 -57.2 -54.7 -55.7 68 -99 SPO 1997 10 23 08 08 96 2.7 -9 676.80 -57.5 -54.6 -55.8 68 -99 SPO 1997 10 23 08 09 93 2.8 -9 676.80 -57.5 -54.5 -55.8 67 -99 SPO 1997 10 23 08 10 89 3.0 -9 676.80 -57.5 -54.4 -55.4 66 -99 SPO 1997 10 23 08 11 88 3.1 -9 676.80 -57.6 -54.2 -55.2 66 -99 SPO 1997 10 23 08 12 88 3.1 -9 676.70 -57.8 -54.2 -55.2 67 -99 SPO 1997 10 23 08 13 90 3.0 -9 676.70 -57.9 -54.4 -55.4 68 -99 SPO 1997 10 23 08 14 91 2.9 -9 676.70 -58.0 -54.6 -55.6 68 -99 SPO 1997 10 23 08 15 91 2.7 -9 676.70 -58.0 -54.6 -55.6 68 -99 SPO 1997 10 23 08 16 92 2.7 -9 676.70 -57.9 -54.7 -55.5 67 -99 SPO 1997 10 23 08 17 94 2.8 -9 676.70 -57.9 -54.8 -55.5 67 -99 SPO 1997 10 23 08 18 99 2.7 -9 676.80 -58.0 -55.0 -55.9 68 -99 SPO 1997 10 23 08 19 102 2.8 -9 676.80 -58.0 -55.1 -56.3 68 -99 SPO 1997 10 23 08 20 100 2.8 -9 676.80 -58.0 -55.2 -56.4 67 -99 SPO 1997 10 23 08 21 97 3.0 -9 676.80 -58.0 -55.1 -56.4 66 -99 SPO 1997 10 23 08 22 94 3.1 -9 676.80 -57.9 -55.0 -56.1 66 -99 SPO 1997 10 23 08 23 93 3.1 -9 676.80 -57.9 -55.0 -55.8 66 -99 SPO 1997 10 23 08 24 92 3.2 -9 676.80 -57.9 -55.0 -55.8 66 -99 SPO 1997 10 23 08 25 91 3.3 -9 676.80 -58.0 -54.9 -55.7 66 -99 SPO 1997 10 23 08 26 92 3.3 -9 676.80 -58.0 -54.8 -55.7 66 -99 SPO 1997 10 23 08 27 94 3.2 -9 676.80 -57.9 -54.8 -55.8 66 -99 SPO 1997 10 23 08 28 95 3.2 -9 676.80 -57.9 -54.8 -55.9 66 -99 SPO 1997 10 23 08 29 92 3.3 -9 676.80 -57.9 -54.7 -55.8 66 -99 SPO 1997 10 23 08 30 90 3.4 -9 676.80 -58.0 -54.7 -55.6 66 -99 SPO 1997 10 23 08 31 89 3.5 -9 676.80 -58.0 -54.6 -55.5 66 -99 SPO 1997 10 23 08 32 87 3.5 -9 676.80 -58.0 -54.4 -55.5 66 -99 SPO 1997 10 23 08 33 87 3.4 -9 676.80 -58.0 -54.4 -55.5 66 -99 SPO 1997 10 23 08 34 88 3.4 -9 676.80 -58.0 -54.3 -55.4 66 -99 SPO 1997 10 23 08 35 89 3.4 -9 676.80 -57.9 -54.3 -55.4 65 -99 SPO 1997 10 23 08 36 90 3.5 -9 676.80 -57.9 -54.2 -55.4 65 -99 SPO 1997 10 23 08 37 91 3.5 -9 676.80 -57.8 -54.0 -55.5 64 -99 SPO 1997 10 23 08 38 90 3.4 -9 676.80 -57.9 -54.0 -55.5 66 -99 SPO 1997 10 23 08 39 87 3.5 -9 676.80 -57.8 -53.8 -55.4 65 -99 SPO 1997 10 23 08 40 84 3.6 -9 676.80 -57.9 -53.6 -55.4 67 -99 SPO 1997 10 23 08 41 80 3.8 -9 676.80 -57.9 -53.5 -55.4 67 -99 SPO 1997 10 23 08 42 81 3.8 -9 676.80 -57.8 -53.4 -55.5 67 -99 SPO 1997 10 23 08 43 81 3.8 -9 676.80 -57.8 -53.5 -55.5 67 -99 SPO 1997 10 23 08 44 81 4.0 -9 676.70 -57.8 -53.4 -55.6 67 -99 SPO 1997 10 23 08 45 79 4.2 -9 676.70 -57.7 -53.1 -55.6 66 -99 SPO 1997 10 23 08 46 77 4.3 -9 676.70 -57.7 -53.0 -55.8 66 -99 SPO 1997 10 23 08 47 76 4.4 -9 676.70 -57.7 -53.0 -56.0 66 -99 SPO 1997 10 23 08 48 75 4.4 -9 676.70 -57.8 -53.0 -56.2 67 -99 SPO 1997 10 23 08 49 75 4.4 -9 676.70 -57.8 -53.2 -56.3 67 -99 SPO 1997 10 23 08 50 77 4.6 -9 676.70 -57.8 -53.2 -56.2 67 -99 SPO 1997 10 23 08 51 78 4.5 -9 676.70 -57.7 -53.1 -56.0 65 -99 SPO 1997 10 23 08 52 79 4.4 -9 676.70 -57.8 -53.2 -56.0 67 -99 SPO 1997 10 23 08 53 80 4.3 -9 676.70 -57.8 -53.3 -55.9 67 -99 SPO 1997 10 23 08 54 84 4.3 -9 676.80 -57.8 -53.3 -55.8 67 -99 SPO 1997 10 23 08 55 89 4.2 -9 676.80 -57.8 -53.4 -55.8 67 -99 SPO 1997 10 23 08 56 95 4.0 -9 676.80 -57.9 -53.8 -56.2 67 -99 SPO 1997 10 23 08 57 100 3.9 -9 676.90 -58.0 -54.2 -56.7 66 -99 SPO 1997 10 23 08 58 99 3.9 -9 676.80 -58.1 -54.5 -57.0 67 -99 SPO 1997 10 23 08 59 94 4.1 -9 676.80 -58.2 -54.3 -56.8 67 -99 SPO 1997 10 23 09 00 91 4.3 -9 676.80 -58.2 -54.0 -56.5 66 0 SPO 1997 10 23 09 01 89 4.3 -9 676.80 -58.2 -53.8 -56.3 65 -99 SPO 1997 10 23 09 02 89 4.2 -9 676.80 -58.1 -53.7 -56.2 64 -99 SPO 1997 10 23 09 03 89 4.0 -9 676.80 -58.1 -53.7 -56.2 64 -99 SPO 1997 10 23 09 04 90 4.0 -9 676.80 -58.1 -53.8 -56.1 64 -99 SPO 1997 10 23 09 05 88 4.0 -9 676.80 -58.1 -53.9 -56.1 63 -99 SPO 1997 10 23 09 06 87 4.1 -9 676.80 -58.1 -54.0 -56.1 63 -99 SPO 1997 10 23 09 07 85 4.1 -9 676.80 -58.0 -54.0 -56.1 63 -99 SPO 1997 10 23 09 08 84 4.2 -9 676.80 -58.1 -54.1 -56.0 66 -99 SPO 1997 10 23 09 09 85 4.1 -9 676.80 -58.0 -54.0 -56.0 65 -99 SPO 1997 10 23 09 10 85 4.1 -9 676.80 -58.0 -54.0 -56.0 66 -99 SPO 1997 10 23 09 11 83 4.2 -9 676.80 -58.0 -53.9 -56.0 66 -99 SPO 1997 10 23 09 12 80 4.4 -9 676.80 -58.0 -53.7 -56.1 66 -99 SPO 1997 10 23 09 13 78 4.6 -9 676.80 -57.9 -53.5 -56.3 66 -99 SPO 1997 10 23 09 14 78 4.6 -9 676.80 -57.9 -53.4 -56.4 66 -99 SPO 1997 10 23 09 15 79 4.6 -9 676.80 -57.9 -53.4 -56.3 67 -99 SPO 1997 10 23 09 16 78 4.5 -9 676.80 -57.9 -53.5 -56.2 67 -99 SPO 1997 10 23 09 17 78 4.6 -9 676.80 -57.8 -53.5 -56.2 66 -99 SPO 1997 10 23 09 18 77 4.7 -9 676.80 -57.8 -53.5 -56.2 66 -99 SPO 1997 10 23 09 19 76 4.8 -9 676.80 -57.8 -53.5 -56.3 66 -99 SPO 1997 10 23 09 20 74 4.9 -9 676.80 -57.7 -53.4 -56.4 65 -99 SPO 1997 10 23 09 21 72 5.1 -9 676.70 -57.7 -53.3 -56.5 66 -99 SPO 1997 10 23 09 22 71 5.2 -9 676.80 -57.6 -53.2 -56.6 65 -99 SPO 1997 10 23 09 23 70 5.3 -9 676.70 -57.7 -53.3 -56.6 66 -99 SPO 1997 10 23 09 24 70 5.4 -9 676.70 -57.7 -53.3 -56.7 67 -99 SPO 1997 10 23 09 25 71 5.3 -9 676.70 -57.6 -53.3 -56.7 66 -99 SPO 1997 10 23 09 26 72 5.2 -9 676.70 -57.6 -53.3 -56.6 66 -99 SPO 1997 10 23 09 27 72 5.2 -9 676.70 -57.6 -53.3 -56.5 66 -99 SPO 1997 10 23 09 28 73 5.2 -9 676.70 -57.6 -53.3 -56.5 65 -99 SPO 1997 10 23 09 29 73 5.2 -9 676.70 -57.6 -53.3 -56.5 65 -99 SPO 1997 10 23 09 30 72 5.2 -9 676.70 -57.6 -53.3 -56.6 64 -99 SPO 1997 10 23 09 31 73 5.2 -9 676.70 -57.6 -53.3 -56.6 64 -99 SPO 1997 10 23 09 32 75 5.1 -9 676.70 -57.6 -53.4 -56.5 65 -99 SPO 1997 10 23 09 33 77 4.9 -9 676.80 -57.6 -53.6 -56.4 65 -99 SPO 1997 10 23 09 34 79 4.8 -9 676.80 -57.7 -53.8 -56.2 65 -99 SPO 1997 10 23 09 35 81 4.8 -9 676.80 -57.7 -53.8 -56.2 65 -99 SPO 1997 10 23 09 36 81 4.7 -9 676.80 -57.7 -53.9 -56.1 65 -99 SPO 1997 10 23 09 37 83 4.6 -9 676.80 -57.7 -54.0 -56.1 65 -99 SPO 1997 10 23 09 38 83 4.6 -9 676.80 -57.8 -54.1 -56.2 66 -99 SPO 1997 10 23 09 39 83 4.4 -9 676.90 -57.8 -54.1 -56.2 66 -99 SPO 1997 10 23 09 40 82 4.5 -9 676.90 -57.8 -54.1 -56.1 65 -99 SPO 1997 10 23 09 41 82 4.8 -9 676.80 -57.8 -54.0 -56.2 66 -99 SPO 1997 10 23 09 42 81 5.0 -9 676.80 -57.9 -54.0 -56.2 67 -99 SPO 1997 10 23 09 43 81 5.2 -9 676.80 -57.9 -54.0 -56.4 67 -99 SPO 1997 10 23 09 44 80 5.2 -9 676.80 -57.9 -54.0 -56.4 67 -99 SPO 1997 10 23 09 45 79 5.2 -9 676.80 -57.9 -54.0 -56.5 66 -99 SPO 1997 10 23 09 46 80 5.1 -9 676.80 -57.9 -54.0 -56.4 66 -99 SPO 1997 10 23 09 47 81 5.1 -9 676.80 -57.9 -54.0 -56.4 65 -99 SPO 1997 10 23 09 48 83 5.0 -9 676.80 -57.8 -54.0 -56.3 64 -99 SPO 1997 10 23 09 49 83 5.1 -9 676.80 -57.8 -53.9 -56.3 64 -99 SPO 1997 10 23 09 50 85 4.8 -9 676.80 -57.8 -53.9 -56.3 65 -99 SPO 1997 10 23 09 51 88 4.6 -9 676.90 -57.9 -54.0 -56.3 66 -99 SPO 1997 10 23 09 52 92 4.5 -9 676.90 -57.9 -54.0 -56.3 66 -99 SPO 1997 10 23 09 53 95 4.5 -9 676.90 -58.0 -54.1 -56.4 66 -99 SPO 1997 10 23 09 54 95 4.5 -9 676.90 -58.0 -54.1 -56.5 66 -99 SPO 1997 10 23 09 55 97 4.4 -9 676.90 -58.2 -54.1 -56.6 67 -99 SPO 1997 10 23 09 56 104 4.2 -9 676.90 -58.2 -54.2 -56.9 66 -99 SPO 1997 10 23 09 57 112 4.2 -9 676.90 -58.4 -54.6 -57.4 66 -99 SPO 1997 10 23 09 58 113 4.1 -9 676.90 -58.5 -55.0 -57.6 66 -99 SPO 1997 10 23 09 59 112 4.0 -9 676.90 -58.6 -55.0 -57.6 66 -99 SPO 1997 10 23 10 00 114 3.8 -9 676.90 -58.6 -55.2 -57.7 65 0 SPO 1997 10 23 10 01 119 3.8 -9 676.90 -58.7 -55.3 -57.7 65 -99 SPO 1997 10 23 10 02 119 3.7 -9 676.90 -58.7 -55.4 -57.7 64 -99 SPO 1997 10 23 10 03 114 3.8 -9 676.90 -58.7 -55.4 -57.7 64 -99 SPO 1997 10 23 10 04 112 3.9 -9 676.90 -58.8 -55.2 -57.7 64 -99 SPO 1997 10 23 10 05 114 3.8 -9 676.90 -58.6 -55.1 -57.6 62 -99 SPO 1997 10 23 10 06 111 3.9 -9 676.90 -58.5 -55.1 -57.6 62 -99 SPO 1997 10 23 10 07 106 3.9 -9 676.90 -58.4 -55.0 -57.4 62 -99 SPO 1997 10 23 10 08 105 4.0 -9 676.90 -58.4 -54.8 -57.3 62 -99 SPO 1997 10 23 10 09 109 3.9 -9 676.90 -58.3 -54.8 -57.4 62 -99 SPO 1997 10 23 10 10 113 3.8 -9 676.90 -58.4 -55.0 -57.4 64 -99 SPO 1997 10 23 10 11 108 3.9 -9 676.90 -58.4 -55.0 -57.4 64 -99 SPO 1997 10 23 10 12 104 4.1 -9 676.90 -58.3 -54.9 -57.3 64 -99 SPO 1997 10 23 10 13 101 4.2 -9 676.90 -58.3 -54.8 -57.2 64 -99 SPO 1997 10 23 10 14 97 4.3 -9 676.80 -58.3 -54.8 -56.9 63 -99 SPO 1997 10 23 10 15 93 4.5 -9 676.80 -58.3 -54.7 -56.7 63 -99 SPO 1997 10 23 10 16 91 4.5 -9 676.80 -58.2 -54.6 -56.6 63 -99 SPO 1997 10 23 10 17 90 4.5 -9 676.80 -58.1 -54.6 -56.5 63 -99 SPO 1997 10 23 10 18 90 4.5 -9 676.80 -58.0 -54.5 -56.4 63 -99 SPO 1997 10 23 10 19 90 4.5 -9 676.80 -58.0 -54.4 -56.3 65 -99 SPO 1997 10 23 10 20 88 4.5 -9 676.80 -57.9 -54.3 -56.3 65 -99 SPO 1997 10 23 10 21 86 4.5 -9 676.90 -57.9 -54.2 -56.2 66 -99 SPO 1997 10 23 10 22 85 4.6 -9 676.90 -57.9 -54.1 -56.2 66 -99 SPO 1997 10 23 10 23 84 4.7 -9 676.90 -57.9 -54.0 -56.2 67 -99 SPO 1997 10 23 10 24 84 4.7 -9 676.90 -57.9 -53.8 -56.3 67 -99 SPO 1997 10 23 10 25 82 4.8 -9 676.90 -57.8 -53.7 -56.3 67 -99 SPO 1997 10 23 10 26 82 4.7 -9 676.90 -57.8 -53.6 -56.3 67 -99 SPO 1997 10 23 10 27 81 4.7 -9 676.90 -57.8 -53.6 -56.3 67 -99 SPO 1997 10 23 10 28 81 4.6 -9 676.90 -57.8 -53.6 -56.3 67 -99 SPO 1997 10 23 10 29 81 4.6 -9 676.90 -57.8 -53.6 -56.3 67 -99 SPO 1997 10 23 10 30 81 4.6 -9 676.90 -57.8 -53.7 -56.3 67 -99 SPO 1997 10 23 10 31 81 4.5 -9 676.90 -57.8 -53.7 -56.3 67 -99 SPO 1997 10 23 10 32 80 4.6 -9 676.90 -57.8 -53.7 -56.3 67 -99 SPO 1997 10 23 10 33 81 4.5 -9 676.90 -57.8 -53.6 -56.3 67 -99 SPO 1997 10 23 10 34 82 4.6 -9 676.90 -57.8 -53.7 -56.2 67 -99 SPO 1997 10 23 10 35 81 4.6 -9 676.90 -57.8 -53.7 -56.2 67 -99 SPO 1997 10 23 10 36 80 4.6 -9 676.90 -57.8 -53.8 -56.3 67 -99 SPO 1997 10 23 10 37 80 4.7 -9 676.90 -57.8 -53.8 -56.3 67 -99 SPO 1997 10 23 10 38 80 4.7 -9 676.90 -57.8 -53.8 -56.3 67 -99 SPO 1997 10 23 10 39 81 4.6 -9 676.90 -57.8 -53.8 -56.3 67 -99 SPO 1997 10 23 10 40 83 4.6 -9 676.90 -57.8 -53.8 -56.3 66 -99 SPO 1997 10 23 10 41 82 4.6 -9 676.90 -57.8 -53.8 -56.2 66 -99 SPO 1997 10 23 10 42 81 4.6 -9 676.90 -57.8 -53.8 -56.3 65 -99 SPO 1997 10 23 10 43 82 4.6 -9 676.90 -57.9 -53.8 -56.3 66 -99 SPO 1997 10 23 10 44 84 4.5 -9 677.00 -57.9 -53.8 -56.2 66 -99 SPO 1997 10 23 10 45 84 4.4 -9 677.00 -57.9 -53.8 -56.2 66 -99 SPO 1997 10 23 10 46 85 4.4 -9 677.00 -57.9 -53.8 -56.2 65 -99 SPO 1997 10 23 10 47 87 4.4 -9 677.00 -57.9 -53.8 -56.3 65 -99 SPO 1997 10 23 10 48 88 4.3 -9 677.00 -58.0 -53.8 -56.3 66 -99 SPO 1997 10 23 10 49 90 4.1 -9 677.00 -58.0 -54.0 -56.3 66 -99 SPO 1997 10 23 10 50 92 4.0 -9 677.00 -58.1 -54.1 -56.3 66 -99 SPO 1997 10 23 10 51 95 3.9 -9 677.00 -58.1 -54.3 -56.4 66 -99 SPO 1997 10 23 10 52 95 3.9 -9 677.00 -58.1 -54.3 -56.4 66 -99 SPO 1997 10 23 10 53 92 3.9 -9 677.00 -58.2 -54.3 -56.4 65 -99 SPO 1997 10 23 10 54 92 3.8 -9 677.00 -58.2 -54.2 -56.4 65 -99 SPO 1997 10 23 10 55 96 3.6 -9 677.00 -58.2 -54.3 -56.4 65 -99 SPO 1997 10 23 10 56 102 3.5 -9 677.10 -58.2 -54.5 -56.6 65 -99 SPO 1997 10 23 10 57 104 3.5 -9 677.10 -58.3 -54.5 -56.8 66 -99 SPO 1997 10 23 10 58 100 3.6 -9 677.10 -58.3 -54.4 -56.8 66 -99 SPO 1997 10 23 10 59 97 3.8 -9 677.00 -58.3 -54.3 -56.6 65 -99 SPO 1997 10 23 11 00 95 3.8 -9 677.00 -58.3 -54.2 -56.5 65 0 SPO 1997 10 23 11 01 94 3.8 -9 677.00 -58.3 -54.1 -56.5 66 -99 SPO 1997 10 23 11 02 92 3.9 -9 677.00 -58.3 -54.0 -56.5 66 -99 SPO 1997 10 23 11 03 90 3.9 -9 677.00 -58.3 -53.8 -56.5 66 -99 SPO 1997 10 23 11 04 91 4.0 -9 677.00 -58.3 -53.7 -56.4 66 -99 SPO 1997 10 23 11 05 94 3.9 -9 677.00 -58.3 -53.7 -56.4 66 -99 SPO 1997 10 23 11 06 95 4.1 -9 677.00 -58.3 -53.7 -56.4 66 -99 SPO 1997 10 23 11 07 92 4.3 -9 677.00 -58.3 -53.7 -56.6 65 -99 SPO 1997 10 23 11 08 87 4.5 -9 677.00 -58.3 -53.5 -56.6 65 -99 SPO 1997 10 23 11 09 84 4.6 -9 676.90 -58.3 -53.3 -56.7 65 -99 SPO 1997 10 23 11 10 83 4.6 -9 676.90 -58.2 -53.1 -56.7 65 -99 SPO 1997 10 23 11 11 84 4.6 -9 676.90 -58.2 -53.0 -56.7 65 -99 SPO 1997 10 23 11 12 84 4.5 -9 676.90 -58.1 -53.0 -56.6 66 -99 SPO 1997 10 23 11 13 84 4.4 -9 676.90 -58.1 -52.9 -56.6 66 -99 SPO 1997 10 23 11 14 85 4.3 -9 676.90 -58.1 -52.9 -56.5 66 -99 SPO 1997 10 23 11 15 86 4.2 -9 677.00 -58.1 -53.0 -56.4 66 -99 SPO 1997 10 23 11 16 87 4.1 -9 677.00 -58.2 -53.0 -56.4 67 -99 SPO 1997 10 23 11 17 87 4.0 -9 677.00 -58.2 -53.1 -56.4 66 -99 SPO 1997 10 23 11 18 86 3.9 -9 677.00 -58.2 -53.2 -56.3 66 -99 SPO 1997 10 23 11 19 86 3.8 -9 677.00 -58.3 -53.2 -56.3 67 -99 SPO 1997 10 23 11 20 85 3.7 -9 677.00 -58.2 -53.2 -56.2 65 -99 SPO 1997 10 23 11 21 84 3.8 -9 677.00 -58.3 -53.2 -56.2 66 -99 SPO 1997 10 23 11 22 84 3.7 -9 677.00 -58.2 -53.1 -56.2 65 -99 SPO 1997 10 23 11 23 85 3.6 -9 677.00 -58.2 -53.0 -56.1 65 -99 SPO 1997 10 23 11 24 86 3.5 -9 677.00 -58.3 -53.0 -56.1 67 -99 SPO 1997 10 23 11 25 87 3.4 -9 677.10 -58.3 -53.1 -56.1 67 -99 SPO 1997 10 23 11 26 87 3.4 -9 677.10 -58.3 -53.1 -56.1 67 -99 SPO 1997 10 23 11 27 89 3.3 -9 677.10 -58.3 -53.1 -56.1 67 -99 SPO 1997 10 23 11 28 93 3.1 -9 677.10 -58.4 -53.2 -56.3 68 -99 SPO 1997 10 23 11 29 97 3.1 -9 677.10 -58.4 -53.3 -56.8 68 -99 SPO 1997 10 23 11 30 98 3.1 -9 677.10 -58.4 -53.4 -57.0 66 -99 SPO 1997 10 23 11 31 93 3.3 -9 677.10 -58.3 -53.3 -56.8 65 -99 SPO 1997 10 23 11 32 89 3.6 -9 677.10 -58.3 -53.0 -56.5 65 -99 SPO 1997 10 23 11 33 86 3.8 -9 677.00 -58.3 -52.8 -56.4 66 -99 SPO 1997 10 23 11 34 82 4.1 -9 677.00 -58.3 -52.6 -56.3 65 -99 SPO 1997 10 23 11 35 80 4.2 -9 677.00 -58.4 -52.4 -56.4 66 -99 SPO 1997 10 23 11 36 79 4.4 -9 677.00 -58.2 -52.3 -56.5 65 -99 SPO 1997 10 23 11 37 80 4.4 -9 677.10 -58.2 -52.2 -56.5 66 -99 SPO 1997 10 23 11 38 83 4.3 -9 677.10 -58.1 -52.2 -56.4 66 -99 SPO 1997 10 23 11 39 84 4.1 -9 677.10 -58.1 -52.2 -56.3 66 -99 SPO 1997 10 23 11 40 86 4.0 -9 677.10 -58.1 -52.4 -56.3 67 -99 SPO 1997 10 23 11 41 86 3.9 -9 677.10 -58.1 -52.5 -56.2 66 -99 SPO 1997 10 23 11 42 86 3.8 -9 677.10 -58.1 -52.6 -56.2 66 -99 SPO 1997 10 23 11 43 87 3.7 -9 677.20 -58.1 -52.7 -56.2 67 -99 SPO 1997 10 23 11 44 89 3.7 -9 677.20 -58.2 -52.8 -56.2 68 -99 SPO 1997 10 23 11 45 94 3.4 -9 677.20 -58.2 -52.9 -56.3 68 -99 SPO 1997 10 23 11 46 105 3.1 -9 677.30 -58.2 -53.2 -56.8 69 -99 SPO 1997 10 23 11 47 113 3.1 -9 677.30 -58.0 -53.6 -57.0 67 -99 SPO 1997 10 23 11 48 115 3.0 -9 677.30 -57.8 -53.9 -57.0 66 -99 SPO 1997 10 23 11 49 113 3.0 -9 677.30 -57.8 -53.9 -57.0 67 -99 SPO 1997 10 23 11 50 113 2.9 -9 677.30 -58.1 -53.9 -57.2 69 -99 SPO 1997 10 23 11 51 114 2.9 -9 677.30 -58.2 -54.0 -57.3 68 -99 SPO 1997 10 23 11 52 118 2.9 -9 677.40 -58.1 -54.0 -57.2 67 -99 SPO 1997 10 23 11 53 122 3.0 -9 677.40 -57.6 -54.0 -56.8 63 -99 SPO 1997 10 23 11 54 122 3.0 -9 677.40 -57.2 -54.1 -56.5 61 -99 SPO 1997 10 23 11 55 120 3.1 -9 677.50 -57.2 -54.1 -56.5 63 -99 SPO 1997 10 23 11 56 117 3.2 -9 677.50 -57.8 -54.2 -57.0 69 -99 SPO 1997 10 23 11 57 120 3.0 -9 677.50 -58.1 -54.2 -57.2 72 -99 SPO 1997 10 23 11 58 121 3.0 -9 677.50 -58.0 -54.3 -57.1 70 -99 SPO 1997 10 23 11 59 122 3.0 -9 677.50 -57.7 -54.2 -56.9 67 -99 SPO 1997 10 23 12 00 122 3.0 -9 677.50 -57.4 -54.1 -56.7 65 0 SPO 1997 10 23 12 01 118 2.9 -9 677.50 -57.2 -53.9 -56.5 65 -99 SPO 1997 10 23 12 02 113 2.9 -9 677.50 -57.6 -53.8 -56.9 68 -99 SPO 1997 10 23 12 03 113 2.9 -9 677.50 -58.0 -53.6 -57.2 71 -99 SPO 1997 10 23 12 04 113 3.1 -9 677.50 -58.2 -53.5 -57.4 70 -99 SPO 1997 10 23 12 05 111 3.1 -9 677.50 -58.3 -53.4 -57.4 69 -99 SPO 1997 10 23 12 06 107 3.1 -9 677.50 -58.3 -53.4 -57.4 68 -99 SPO 1997 10 23 12 07 104 3.1 -9 677.50 -58.4 -53.3 -57.4 68 -99 SPO 1997 10 23 12 08 101 3.1 -9 677.40 -58.4 -53.2 -57.4 68 -99 SPO 1997 10 23 12 09 99 3.2 -9 677.40 -58.4 -53.2 -57.4 68 -99 SPO 1997 10 23 12 10 99 3.2 -9 677.40 -58.4 -53.2 -57.3 68 -99 SPO 1997 10 23 12 11 102 3.2 -9 677.40 -58.4 -53.0 -57.4 68 -99 SPO 1997 10 23 12 12 104 3.2 -9 677.50 -58.4 -53.0 -57.5 68 -99 SPO 1997 10 23 12 13 103 3.3 -9 677.50 -58.3 -53.0 -57.4 67 -99 SPO 1997 10 23 12 14 103 3.3 -9 677.50 -58.2 -53.0 -57.4 66 -99 SPO 1997 10 23 12 15 103 3.2 -9 677.50 -58.4 -53.0 -57.5 66 -99 SPO 1997 10 23 12 16 104 3.2 -9 677.50 -58.4 -53.1 -57.6 66 -99 SPO 1997 10 23 12 17 102 3.2 -9 677.50 -58.4 -53.2 -57.6 65 -99 SPO 1997 10 23 12 18 96 3.3 -9 677.40 -58.4 -53.1 -57.4 65 -99 SPO 1997 10 23 12 19 93 3.3 -9 677.40 -58.4 -52.8 -57.2 65 -99 SPO 1997 10 23 12 20 91 3.3 -9 677.40 -58.4 -52.6 -57.1 65 -99 SPO 1997 10 23 12 21 90 3.2 -9 677.40 -58.4 -52.5 -57.0 66 -99 SPO 1997 10 23 12 22 90 3.2 -9 677.40 -58.5 -52.4 -56.9 67 -99 SPO 1997 10 23 12 23 90 3.2 -9 677.40 -58.3 -52.4 -56.8 67 -99 SPO 1997 10 23 12 24 90 3.2 -9 677.40 -58.2 -52.3 -56.7 66 -99 SPO 1997 10 23 12 25 87 3.3 -9 677.40 -58.2 -52.2 -56.6 68 -99 SPO 1997 10 23 12 26 85 3.3 -9 677.40 -58.3 -52.0 -56.6 69 -99 SPO 1997 10 23 12 27 84 3.5 -9 677.40 -58.2 -52.0 -56.6 68 -99 SPO 1997 10 23 12 28 85 3.5 -9 677.40 -58.2 -52.0 -56.6 68 -99 SPO 1997 10 23 12 29 85 3.4 -9 677.40 -58.2 -52.1 -56.6 68 -99 SPO 1997 10 23 12 30 85 3.3 -9 677.40 -58.1 -52.0 -56.6 68 -99 SPO 1997 10 23 12 31 85 3.2 -9 677.40 -58.2 -52.0 -56.6 68 -99 SPO 1997 10 23 12 32 84 3.3 -9 677.40 -58.2 -52.1 -56.5 68 -99 SPO 1997 10 23 12 33 83 3.4 -9 677.40 -58.2 -52.1 -56.5 68 -99 SPO 1997 10 23 12 34 80 3.5 -9 677.40 -58.2 -52.0 -56.5 68 -99 SPO 1997 10 23 12 35 79 3.6 -9 677.40 -58.2 -51.9 -56.5 68 -99 SPO 1997 10 23 12 36 78 3.7 -9 677.40 -58.2 -51.9 -56.5 68 -99 SPO 1997 10 23 12 37 78 3.8 -9 677.30 -58.2 -51.8 -56.5 68 -99 SPO 1997 10 23 12 38 77 3.7 -9 677.30 -58.1 -51.6 -56.5 67 -99 SPO 1997 10 23 12 39 77 3.7 -9 677.30 -58.0 -51.4 -56.4 67 -99 SPO 1997 10 23 12 40 77 3.7 -9 677.30 -58.0 -51.2 -56.4 68 -99 SPO 1997 10 23 12 41 79 3.7 -9 677.30 -58.0 -51.2 -56.3 68 -99 SPO 1997 10 23 12 42 82 3.5 -9 677.30 -58.0 -51.3 -56.3 69 -99 SPO 1997 10 23 12 43 87 3.3 -9 677.40 -58.0 -51.5 -56.4 69 -99 SPO 1997 10 23 12 44 89 3.3 -9 677.30 -58.0 -51.7 -56.7 69 -99 SPO 1997 10 23 12 45 89 3.4 -9 677.40 -58.0 -51.8 -56.8 68 -99 SPO 1997 10 23 12 46 89 3.5 -9 677.40 -58.1 -52.1 -56.8 69 -99 SPO 1997 10 23 12 47 88 3.6 -9 677.40 -58.2 -52.2 -56.8 68 -99 SPO 1997 10 23 12 48 91 3.5 -9 677.40 -58.2 -52.3 -56.9 68 -99 SPO 1997 10 23 12 49 93 3.5 -9 677.30 -58.3 -52.4 -57.2 68 -99 SPO 1997 10 23 12 50 91 3.5 -9 677.40 -58.4 -52.6 -57.2 69 -99 SPO 1997 10 23 12 51 92 3.4 -9 677.40 -58.4 -52.6 -57.1 69 -99 SPO 1997 10 23 12 52 96 3.2 -9 677.40 -58.4 -52.8 -57.2 69 -99 SPO 1997 10 23 12 53 98 3.1 -9 677.40 -58.3 -52.9 -57.4 68 -99 SPO 1997 10 23 12 54 98 3.2 -9 677.40 -58.3 -53.0 -57.5 68 -99 SPO 1997 10 23 12 55 99 3.3 -9 677.40 -58.3 -52.9 -57.4 68 -99 SPO 1997 10 23 12 56 102 3.3 -9 677.40 -58.4 -52.9 -57.4 69 -99 SPO 1997 10 23 12 57 105 3.3 -9 677.40 -58.4 -53.1 -57.6 69 -99 SPO 1997 10 23 12 58 106 3.2 -9 677.40 -58.4 -53.3 -57.7 68 -99 SPO 1997 10 23 12 59 106 3.0 -9 677.40 -58.6 -53.7 -57.8 70 -99 SPO 1997 10 23 13 00 103 3.0 -9 677.40 -58.7 -54.0 -57.9 68 0 SPO 1997 10 23 13 01 100 3.1 -9 677.40 -58.7 -53.7 -57.8 66 -99 SPO 1997 10 23 13 02 102 3.0 -9 677.40 -58.6 -53.6 -57.6 66 -99 SPO 1997 10 23 13 03 103 3.0 -9 677.40 -58.6 -53.6 -57.7 66 -99 SPO 1997 10 23 13 04 105 2.9 -9 677.40 -58.6 -53.6 -57.6 66 -99 SPO 1997 10 23 13 05 110 2.8 -9 677.40 -58.6 -53.8 -57.7 66 -99 SPO 1997 10 23 13 06 114 2.9 -9 677.40 -58.5 -54.0 -57.7 66 -99 SPO 1997 10 23 13 07 111 3.0 -9 677.40 -58.6 -54.0 -57.8 67 -99 SPO 1997 10 23 13 08 106 2.9 -9 677.40 -58.7 -53.7 -57.9 68 -99 SPO 1997 10 23 13 09 107 3.1 -9 677.40 -58.8 -53.6 -57.9 69 -99 SPO 1997 10 23 13 10 106 3.1 -9 677.40 -58.8 -53.4 -57.8 69 -99 SPO 1997 10 23 13 11 102 3.1 -9 677.40 -58.8 -53.2 -57.6 68 -99 SPO 1997 10 23 13 12 97 3.2 -9 677.40 -58.7 -52.9 -57.4 66 -99 SPO 1997 10 23 13 13 94 3.2 -9 677.30 -58.7 -52.8 -57.2 65 -99 SPO 1997 10 23 13 14 94 3.1 -9 677.40 -58.6 -52.7 -57.1 65 -99 SPO 1997 10 23 13 15 94 3.1 -9 677.30 -58.6 -52.6 -57.1 65 -99 SPO 1997 10 23 13 16 95 3.2 -9 677.40 -58.6 -52.6 -57.0 65 -99 SPO 1997 10 23 13 17 94 3.3 -9 677.40 -58.6 -52.5 -57.0 66 -99 SPO 1997 10 23 13 18 92 3.5 -9 677.40 -58.6 -52.5 -57.0 66 -99 SPO 1997 10 23 13 19 90 3.5 -9 677.30 -58.6 -52.5 -57.0 66 -99 SPO 1997 10 23 13 20 88 3.6 -9 677.30 -58.6 -52.5 -57.0 66 -99 SPO 1997 10 23 13 21 87 3.5 -9 677.30 -58.5 -52.4 -56.9 66 -99 SPO 1997 10 23 13 22 89 3.5 -9 677.30 -58.5 -52.4 -56.9 66 -99 SPO 1997 10 23 13 23 87 3.5 -9 677.40 -58.5 -52.4 -56.8 66 -99 SPO 1997 10 23 13 24 86 3.5 -9 677.30 -58.5 -52.2 -56.8 66 -99 SPO 1997 10 23 13 25 83 3.6 -9 677.30 -58.5 -52.0 -56.7 67 -99 SPO 1997 10 23 13 26 80 3.8 -9 677.30 -58.5 -51.8 -56.7 66 -99 SPO 1997 10 23 13 27 77 3.9 -9 677.30 -58.5 -51.6 -56.9 66 -99 SPO 1997 10 23 13 28 74 4.2 -9 677.30 -58.5 -51.4 -57.2 67 -99 SPO 1997 10 23 13 29 73 4.3 -9 677.20 -58.5 -51.3 -57.3 67 -99 SPO 1997 10 23 13 30 73 4.4 -9 677.20 -58.4 -51.2 -57.3 66 -99 SPO 1997 10 23 13 31 73 4.7 -9 677.20 -58.4 -51.0 -57.3 66 -99 SPO 1997 10 23 13 32 72 4.8 -9 677.20 -58.4 -50.8 -57.3 66 -99 SPO 1997 10 23 13 33 71 4.9 -9 677.20 -58.3 -50.6 -57.2 66 -99 SPO 1997 10 23 13 34 70 4.9 -9 677.20 -58.2 -50.4 -57.2 66 -99 SPO 1997 10 23 13 35 69 5.0 -9 677.20 -58.0 -50.2 -57.1 65 -99 SPO 1997 10 23 13 36 68 5.0 -9 677.20 -58.0 -50.0 -57.1 66 -99 SPO 1997 10 23 13 37 69 5.0 -9 677.20 -58.0 -50.0 -57.1 67 -99 SPO 1997 10 23 13 38 68 5.1 -9 677.10 -57.9 -49.9 -57.1 67 -99 SPO 1997 10 23 13 39 66 5.1 -9 677.10 -57.9 -49.7 -57.1 67 -99 SPO 1997 10 23 13 40 66 5.3 -9 677.10 -57.8 -49.6 -57.0 67 -99 SPO 1997 10 23 13 41 66 5.4 -9 677.10 -57.8 -49.6 -57.0 67 -99 SPO 1997 10 23 13 42 65 5.4 -9 677.10 -57.8 -49.5 -57.0 67 -99 SPO 1997 10 23 13 43 65 5.4 -9 677.10 -57.7 -49.4 -57.0 66 -99 SPO 1997 10 23 13 44 64 5.4 -9 677.10 -57.7 -49.5 -56.9 66 -99 SPO 1997 10 23 13 45 64 5.4 -9 677.10 -57.6 -49.6 -56.9 66 -99 SPO 1997 10 23 13 46 64 5.3 -9 677.10 -57.6 -49.7 -56.8 67 -99 SPO 1997 10 23 13 47 64 5.1 -9 677.10 -57.6 -49.7 -56.8 67 -99 SPO 1997 10 23 13 48 64 5.1 -9 677.20 -57.6 -49.7 -56.8 67 -99 SPO 1997 10 23 13 49 65 5.1 -9 677.20 -57.6 -49.8 -56.7 67 -99 SPO 1997 10 23 13 50 64 5.2 -9 677.20 -57.5 -49.8 -56.7 67 -99 SPO 1997 10 23 13 51 65 5.1 -9 677.20 -57.5 -49.8 -56.7 67 -99 SPO 1997 10 23 13 52 65 5.2 -9 677.20 -57.5 -49.9 -56.7 67 -99 SPO 1997 10 23 13 53 63 5.2 -9 677.10 -57.5 -50.0 -56.7 66 -99 SPO 1997 10 23 13 54 62 5.3 -9 677.10 -57.5 -49.9 -56.7 66 -99 SPO 1997 10 23 13 55 62 5.3 -9 677.10 -57.5 -49.8 -56.7 66 -99 SPO 1997 10 23 13 56 63 5.2 -9 677.10 -57.4 -49.6 -56.7 65 -99 SPO 1997 10 23 13 57 63 5.3 -9 677.10 -57.4 -49.7 -56.7 65 -99 SPO 1997 10 23 13 58 63 5.3 -9 677.10 -57.5 -49.8 -56.6 67 -99 SPO 1997 10 23 13 59 64 5.3 -9 677.10 -57.4 -49.8 -56.6 67 -99 SPO 1997 10 23 14 00 64 5.3 -9 677.10 -57.4 -49.8 -56.6 67 0 SPO 1997 10 23 14 01 64 5.3 -9 677.10 -57.3 -49.9 -56.6 66 -99 SPO 1997 10 23 14 02 64 5.2 -9 677.10 -57.3 -50.0 -56.5 66 -99 SPO 1997 10 23 14 03 63 5.2 -9 677.20 -57.3 -49.9 -56.5 67 -99 SPO 1997 10 23 14 04 63 5.2 -9 677.10 -57.3 -49.8 -56.5 66 -99 SPO 1997 10 23 14 05 64 5.0 -9 677.20 -57.3 -49.8 -56.4 66 -99 SPO 1997 10 23 14 06 65 4.8 -9 677.20 -57.3 -50.0 -56.4 66 -99 SPO 1997 10 23 14 07 67 4.6 -9 677.20 -57.3 -50.2 -56.2 66 -99 SPO 1997 10 23 14 08 68 4.3 -9 677.30 -57.3 -50.4 -56.0 64 -99 SPO 1997 10 23 14 09 70 4.1 -9 677.30 -57.4 -50.5 -55.9 65 -99 SPO 1997 10 23 14 10 74 3.8 -9 677.30 -57.4 -50.6 -55.8 65 -99 SPO 1997 10 23 14 11 76 3.7 -9 677.30 -57.5 -50.8 -55.9 65 -99 SPO 1997 10 23 14 12 75 3.9 -9 677.30 -57.6 -50.9 -56.0 66 -99 SPO 1997 10 23 14 13 74 3.9 -9 677.30 -57.6 -50.8 -55.9 66 -99 SPO 1997 10 23 14 14 73 3.9 -9 677.30 -57.7 -50.9 -55.9 66 -99 SPO 1997 10 23 14 15 74 3.8 -9 677.30 -57.8 -51.0 -55.9 66 -99 SPO 1997 10 23 14 16 74 3.8 -9 677.30 -57.8 -51.0 -55.9 65 -99 SPO 1997 10 23 14 17 73 4.0 -9 677.30 -57.8 -50.8 -55.9 64 -99 SPO 1997 10 23 14 18 73 4.0 -9 677.40 -57.8 -50.7 -55.9 64 -99 SPO 1997 10 23 14 19 73 4.1 -9 677.30 -57.9 -50.5 -56.0 65 -99 SPO 1997 10 23 14 20 72 4.2 -9 677.30 -57.9 -50.3 -56.0 64 -99 SPO 1997 10 23 14 21 73 4.1 -9 677.30 -57.9 -50.3 -56.1 62 -99 SPO 1997 10 23 14 22 73 4.0 -9 677.40 -57.9 -50.4 -56.1 62 -99 SPO 1997 10 23 14 23 72 4.0 -9 677.40 -57.8 -50.4 -56.1 62 -99 SPO 1997 10 23 14 24 72 4.0 -9 677.30 -57.8 -50.4 -56.2 62 -99 SPO 1997 10 23 14 25 73 4.0 -9 677.30 -57.7 -50.3 -56.2 63 -99 SPO 1997 10 23 14 26 75 3.9 -9 677.30 -57.7 -50.3 -56.1 63 -99 SPO 1997 10 23 14 27 75 4.0 -9 677.30 -57.7 -50.4 -56.1 63 -99 SPO 1997 10 23 14 28 73 4.1 -9 677.30 -57.7 -50.4 -56.2 63 -99 SPO 1997 10 23 14 29 72 4.1 -9 677.30 -57.7 -50.3 -56.3 63 -99 SPO 1997 10 23 14 30 73 4.1 -9 677.30 -57.7 -50.4 -56.4 64 -99 SPO 1997 10 23 14 31 75 4.0 -9 677.20 -57.7 -50.4 -56.4 64 -99 SPO 1997 10 23 14 32 75 4.0 -9 677.30 -57.7 -50.6 -56.3 64 -99 SPO 1997 10 23 14 33 75 3.9 -9 677.30 -57.7 -50.6 -56.2 65 -99 SPO 1997 10 23 14 34 76 3.6 -9 677.30 -57.7 -50.7 -56.1 64 -99 SPO 1997 10 23 14 35 79 3.4 -9 677.30 -57.7 -50.8 -56.0 63 -99 SPO 1997 10 23 14 36 84 3.2 -9 677.30 -57.7 -50.9 -55.9 63 -99 SPO 1997 10 23 14 37 85 3.3 -9 677.30 -57.8 -51.0 -56.0 63 -99 SPO 1997 10 23 14 38 81 3.5 -9 677.30 -57.9 -50.8 -56.1 64 -99 SPO 1997 10 23 14 39 78 3.6 -9 677.30 -58.1 -50.6 -56.2 66 -99 SPO 1997 10 23 14 40 78 3.7 -9 677.30 -58.2 -50.3 -56.3 66 -99 SPO 1997 10 23 14 41 81 3.6 -9 677.30 -58.4 -50.2 -56.4 66 -99 SPO 1997 10 23 14 42 82 3.6 -9 677.30 -58.4 -50.3 -56.5 66 -99 SPO 1997 10 23 14 43 83 3.6 -9 677.20 -58.5 -50.4 -56.6 65 -99 SPO 1997 10 23 14 44 82 3.7 -9 677.20 -58.6 -50.3 -56.7 66 -99 SPO 1997 10 23 14 45 82 3.7 -9 677.20 -58.6 -50.2 -56.8 65 -99 SPO 1997 10 23 14 46 84 3.5 -9 677.30 -58.7 -50.2 -56.8 65 -99 SPO 1997 10 23 14 47 88 3.4 -9 677.30 -58.7 -50.4 -56.7 63 -99 SPO 1997 10 23 14 48 87 3.5 -9 677.30 -58.6 -50.5 -56.8 62 -99 SPO 1997 10 23 14 49 86 3.4 -9 677.30 -58.6 -50.4 -56.8 62 -99 SPO 1997 10 23 14 50 89 3.4 -9 677.30 -58.6 -50.4 -56.8 62 -99 SPO 1997 10 23 14 51 99 3.2 -9 677.30 -58.6 -50.6 -57.2 61 -99 SPO 1997 10 23 14 52 123 3.0 -9 677.40 -58.5 -51.8 -57.4 60 -99 SPO 1997 10 23 14 53 135 2.6 -9 677.40 -58.4 -53.2 -57.5 59 -99 SPO 1997 10 23 14 54 129 2.9 -9 677.40 -58.5 -53.7 -57.6 60 -99 SPO 1997 10 23 14 55 122 3.2 -9 677.40 -58.4 -53.5 -57.6 60 -99 SPO 1997 10 23 14 56 123 3.2 -9 677.40 -58.7 -53.3 -57.8 62 -99 SPO 1997 10 23 14 57 133 3.2 -9 677.40 -58.6 -53.5 -57.8 62 -99 SPO 1997 10 23 14 58 133 3.0 -9 677.50 -58.3 -53.4 -57.6 60 -99 SPO 1997 10 23 14 59 146 2.8 -9 677.50 -58.0 -53.4 -57.3 59 -99 SPO 1997 10 23 15 00 147 2.7 -9 677.60 -58.2 -53.8 -57.5 61 0 SPO 1997 10 23 15 01 139 2.6 -9 677.50 -58.2 -53.8 -57.4 61 -99 SPO 1997 10 23 15 02 140 3.1 -9 677.50 -57.6 -53.9 -57.0 57 -99 SPO 1997 10 23 15 03 139 3.0 -9 677.50 -57.3 -53.8 -56.7 56 -99 SPO 1997 10 23 15 04 139 2.7 -9 677.50 -57.3 -53.8 -56.6 57 -99 SPO 1997 10 23 15 05 137 2.8 -9 677.60 -57.2 -53.6 -56.6 59 -99 SPO 1997 10 23 15 06 142 2.5 -9 677.60 -57.3 -53.4 -56.6 60 -99 SPO 1997 10 23 15 07 141 2.7 -9 677.60 -57.5 -53.6 -56.8 62 -99 SPO 1997 10 23 15 08 138 2.8 -9 677.60 -57.4 -53.6 -56.6 60 -99 SPO 1997 10 23 15 09 133 2.9 -9 677.60 -57.4 -53.6 -56.6 61 -99 SPO 1997 10 23 15 10 130 3.1 -9 677.60 -57.6 -53.5 -56.8 63 -99 SPO 1997 10 23 15 11 129 3.1 -9 677.60 -57.8 -53.4 -57.2 65 -99 SPO 1997 10 23 15 12 125 3.2 -9 677.60 -57.8 -53.3 -57.1 64 -99 SPO 1997 10 23 15 13 121 3.3 -9 677.60 -58.0 -53.2 -57.2 66 -99 SPO 1997 10 23 15 14 121 3.5 -9 677.60 -58.3 -53.2 -57.5 67 -99 SPO 1997 10 23 15 15 124 3.5 -9 677.60 -58.2 -53.1 -57.5 65 -99 SPO 1997 10 23 15 16 121 3.6 -9 677.60 -58.2 -53.1 -57.4 65 -99 SPO 1997 10 23 15 17 122 3.7 -9 677.60 -58.5 -53.0 -57.6 66 -99 SPO 1997 10 23 15 18 119 3.7 -9 677.60 -58.6 -52.9 -57.7 66 -99 SPO 1997 10 23 15 19 117 3.7 -9 677.60 -58.7 -52.8 -57.8 65 -99 SPO 1997 10 23 15 20 114 3.8 -9 677.60 -58.7 -52.7 -57.8 63 -99 SPO 1997 10 23 15 21 111 3.8 -9 677.60 -58.7 -52.6 -57.9 62 -99 SPO 1997 10 23 15 22 106 3.8 -9 677.60 -58.7 -52.4 -57.8 62 -99 SPO 1997 10 23 15 23 100 3.7 -9 677.50 -58.7 -52.2 -57.6 62 -99 SPO 1997 10 23 15 24 107 3.7 -9 677.60 -58.7 -52.2 -57.6 62 -99 SPO 1997 10 23 15 25 110 3.9 -9 677.60 -58.7 -52.2 -57.8 62 -99 SPO 1997 10 23 15 26 108 4.1 -9 677.50 -58.8 -52.3 -57.9 63 -99 SPO 1997 10 23 15 27 108 4.2 -9 677.50 -58.8 -52.3 -57.9 63 -99 SPO 1997 10 23 15 28 109 4.1 -9 677.50 -58.8 -52.4 -57.8 63 -99 SPO 1997 10 23 15 29 111 3.9 -9 677.50 -58.9 -52.5 -57.8 64 -99 SPO 1997 10 23 15 30 112 3.7 -9 677.50 -58.9 -52.6 -57.8 63 -99 SPO 1997 10 23 15 31 116 3.5 -9 677.60 -58.9 -52.6 -57.9 61 -99 SPO 1997 10 23 15 32 123 3.5 -9 677.60 -59.0 -52.7 -58.0 62 -99 SPO 1997 10 23 15 33 125 3.5 -9 677.60 -59.0 -52.8 -58.0 61 -99 SPO 1997 10 23 15 34 126 3.5 -9 677.70 -59.0 -52.7 -58.0 62 -99 SPO 1997 10 23 15 35 133 3.7 -9 677.70 -58.7 -52.7 -57.9 60 -99 SPO 1997 10 23 15 36 132 3.8 -9 677.70 -58.4 -52.6 -57.6 59 -99 SPO 1997 10 23 15 37 134 4.0 -9 677.70 -58.3 -52.5 -57.6 59 -99 SPO 1997 10 23 15 38 131 4.0 -9 677.70 -58.3 -52.4 -57.7 60 -99 SPO 1997 10 23 15 39 127 4.0 -9 677.70 -58.6 -52.4 -57.9 63 -99 SPO 1997 10 23 15 40 122 4.0 -9 677.60 -58.8 -52.3 -58.0 65 -99 SPO 1997 10 23 15 41 121 4.0 -9 677.60 -58.8 -52.2 -58.0 64 -99 SPO 1997 10 23 15 42 121 4.0 -9 677.60 -58.9 -52.1 -58.0 64 -99 SPO 1997 10 23 15 43 120 4.0 -9 677.60 -58.8 -52.0 -58.0 61 -99 SPO 1997 10 23 15 44 119 4.0 -9 677.60 -58.8 -52.0 -58.0 61 -99 SPO 1997 10 23 15 45 121 4.1 -9 677.60 -58.8 -51.9 -58.0 61 -99 SPO 1997 10 23 15 46 120 4.0 -9 677.60 -58.8 -51.9 -58.0 61 -99 SPO 1997 10 23 15 47 120 4.0 -9 677.60 -58.8 -51.8 -57.9 61 -99 SPO 1997 10 23 15 48 119 4.0 -9 677.60 -58.8 -51.8 -57.9 61 -99 SPO 1997 10 23 15 49 115 4.0 -9 677.60 -58.8 -51.7 -57.8 62 -99 SPO 1997 10 23 15 50 113 4.0 -9 677.60 -58.8 -51.7 -57.6 62 -99 SPO 1997 10 23 15 51 113 3.9 -9 677.60 -58.8 -51.6 -57.6 62 -99 SPO 1997 10 23 15 52 114 3.7 -9 677.60 -58.8 -51.6 -57.6 62 -99 SPO 1997 10 23 15 53 110 3.7 -9 677.60 -58.8 -51.6 -57.6 63 -99 SPO 1997 10 23 15 54 105 3.8 -9 677.60 -58.8 -51.5 -57.4 62 -99 SPO 1997 10 23 15 55 102 3.8 -9 677.60 -58.8 -51.5 -57.2 62 -99 SPO 1997 10 23 15 56 102 3.7 -9 677.60 -58.8 -51.4 -57.1 62 -99 SPO 1997 10 23 15 57 101 3.6 -9 677.60 -58.8 -51.4 -57.0 61 -99 SPO 1997 10 23 15 58 99 3.6 -9 677.50 -58.8 -51.4 -57.0 61 -99 SPO 1997 10 23 15 59 96 3.7 -9 677.50 -58.8 -51.3 -57.0 61 -99 SPO 1997 10 23 16 00 92 3.8 -9 677.50 -58.8 -51.2 -57.0 62 0 SPO 1997 10 23 16 01 90 3.8 -9 677.50 -58.7 -51.2 -57.0 61 -99 SPO 1997 10 23 16 02 85 4.0 -9 677.50 -58.7 -51.2 -57.1 61 -99 SPO 1997 10 23 16 03 80 4.3 -9 677.40 -58.6 -51.0 -57.2 62 -99 SPO 1997 10 23 16 04 78 4.4 -9 677.40 -58.5 -50.6 -57.3 62 -99 SPO 1997 10 23 16 05 76 4.5 -9 677.40 -58.4 -50.2 -57.3 61 -99 SPO 1997 10 23 16 06 74 4.5 -9 677.40 -58.4 -50.0 -57.3 62 -99 SPO 1997 10 23 16 07 73 4.5 -9 677.30 -58.2 -49.8 -57.2 61 -99 SPO 1997 10 23 16 08 73 4.5 -9 677.30 -58.2 -49.6 -57.2 62 -99 SPO 1997 10 23 16 09 72 4.4 -9 677.30 -58.1 -49.4 -57.2 61 -99 SPO 1997 10 23 16 10 74 4.6 -9 677.30 -58.2 -49.3 -57.1 62 -99 SPO 1997 10 23 16 11 72 4.6 -9 677.30 -58.2 -49.2 -57.1 62 -99 SPO 1997 10 23 16 12 75 4.7 -9 677.30 -58.1 -49.1 -57.1 62 -99 SPO 1997 10 23 16 13 78 4.7 -9 677.30 -58.0 -49.2 -57.0 62 -99 SPO 1997 10 23 16 14 79 4.7 -9 677.30 -58.0 -49.2 -57.0 62 -99 SPO 1997 10 23 16 15 80 4.6 -9 677.30 -57.9 -49.2 -56.8 64 -99 SPO 1997 10 23 16 16 80 4.6 -9 677.30 -57.9 -49.4 -56.7 64 -99 SPO 1997 10 23 16 17 82 4.6 -9 677.30 -57.9 -49.4 -56.6 64 -99 SPO 1997 10 23 16 18 81 4.5 -9 677.30 -57.8 -49.4 -56.6 63 -99 SPO 1997 10 23 16 19 82 4.4 -9 677.30 -57.8 -49.5 -56.5 62 -99 SPO 1997 10 23 16 20 84 4.3 -9 677.30 -57.8 -49.8 -56.4 62 -99 SPO 1997 10 23 16 21 87 4.2 -9 677.40 -57.9 -49.9 -56.4 64 -99 SPO 1997 10 23 16 22 89 4.0 -9 677.40 -57.9 -50.0 -56.4 62 -99 SPO 1997 10 23 16 23 90 3.9 -9 677.40 -57.9 -50.0 -56.5 64 -99 SPO 1997 10 23 16 24 90 3.9 -9 677.40 -58.0 -50.1 -56.5 63 -99 SPO 1997 10 23 16 25 90 3.8 -9 677.40 -58.0 -50.2 -56.6 63 -99 SPO 1997 10 23 16 26 92 3.7 -9 677.40 -58.2 -50.3 -56.8 65 -99 SPO 1997 10 23 16 27 93 3.6 -9 677.40 -58.2 -50.4 -57.0 65 -99 SPO 1997 10 23 16 28 93 3.6 -9 677.40 -58.3 -50.4 -57.1 65 -99 SPO 1997 10 23 16 29 92 3.6 -9 677.40 -58.3 -50.4 -57.1 65 -99 SPO 1997 10 23 16 30 92 3.5 -9 677.40 -58.4 -50.3 -57.0 65 -99 SPO 1997 10 23 16 31 93 3.4 -9 677.40 -58.4 -50.3 -57.0 65 -99 SPO 1997 10 23 16 32 95 3.3 -9 677.40 -58.4 -50.5 -57.2 65 -99 SPO 1997 10 23 16 33 96 3.3 -9 677.40 -58.4 -50.6 -57.3 64 -99 SPO 1997 10 23 16 34 97 3.1 -9 677.50 -58.4 -50.8 -57.3 64 -99 SPO 1997 10 23 16 35 102 3.2 -9 677.50 -58.5 -51.0 -57.4 64 -99 SPO 1997 10 23 16 36 106 3.1 -9 677.50 -58.4 -51.2 -57.4 62 -99 SPO 1997 10 23 16 37 110 3.3 -9 677.50 -58.4 -51.2 -57.4 62 -99 SPO 1997 10 23 16 38 108 3.3 -9 677.50 -58.4 -51.1 -57.5 62 -99 SPO 1997 10 23 16 39 111 3.2 -9 677.50 -58.5 -51.0 -57.6 62 -99 SPO 1997 10 23 16 40 112 3.2 -9 677.50 -58.5 -50.8 -57.6 62 -99 SPO 1997 10 23 16 41 113 3.1 -9 677.50 -58.6 -50.6 -57.6 62 -99 SPO 1997 10 23 16 42 116 3.0 -9 677.50 -58.6 -50.5 -57.6 62 -99 SPO 1997 10 23 16 43 119 3.0 -9 677.50 -58.6 -50.4 -57.5 62 -99 SPO 1997 10 23 16 44 123 3.0 -9 677.60 -58.6 -50.4 -57.6 62 -99 SPO 1997 10 23 16 45 127 3.2 -9 677.60 -58.6 -50.6 -57.6 62 -99 SPO 1997 10 23 16 46 128 3.2 -9 677.60 -58.7 -50.7 -57.8 64 -99 SPO 1997 10 23 16 47 124 3.2 -9 677.60 -58.8 -50.7 -57.8 65 -99 SPO 1997 10 23 16 48 122 3.2 -9 677.60 -58.8 -50.6 -57.8 64 -99 SPO 1997 10 23 16 49 119 3.3 -9 677.60 -58.8 -50.4 -57.8 63 -99 SPO 1997 10 23 16 50 115 3.3 -9 677.60 -58.7 -50.4 -57.7 62 -99 SPO 1997 10 23 16 51 115 3.3 -9 677.60 -58.7 -50.4 -57.7 61 -99 SPO 1997 10 23 16 52 112 3.4 -9 677.60 -58.7 -50.4 -57.6 61 -99 SPO 1997 10 23 16 53 107 3.6 -9 677.60 -58.7 -50.3 -57.6 62 -99 SPO 1997 10 23 16 54 106 3.5 -9 677.60 -58.7 -50.0 -57.4 62 -99 SPO 1997 10 23 16 55 109 3.5 -9 677.60 -58.6 -49.9 -57.4 62 -99 SPO 1997 10 23 16 56 117 3.3 -9 677.70 -58.6 -50.1 -57.6 62 -99 SPO 1997 10 23 16 57 121 3.5 -9 677.70 -58.4 -50.4 -57.6 62 -99 SPO 1997 10 23 16 58 119 3.4 -9 677.70 -57.8 -50.7 -57.1 59 -99 SPO 1997 10 23 16 59 114 3.5 -9 677.70 -57.8 -50.8 -57.0 61 -99 SPO 1997 10 23 17 00 109 3.6 -9 677.60 -58.2 -50.6 -57.3 65 0 SPO 1997 10 23 17 01 109 3.6 -9 677.60 -58.4 -50.5 -57.5 66 -99 SPO 1997 10 23 17 02 109 3.6 -9 677.60 -58.4 -50.4 -57.5 65 -99 SPO 1997 10 23 17 03 110 3.5 -9 677.70 -58.3 -50.3 -57.4 64 -99 SPO 1997 10 23 17 04 113 3.4 -9 677.70 -58.2 -50.1 -57.3 62 -99 SPO 1997 10 23 17 05 114 3.3 -9 677.70 -57.8 -50.0 -57.0 60 -99 SPO 1997 10 23 17 06 113 3.1 -9 677.70 -57.7 -49.6 -56.9 63 -99 SPO 1997 10 23 17 07 113 3.0 -9 677.70 -57.7 -49.6 -56.9 63 -99 SPO 1997 10 23 17 08 112 3.0 -9 677.70 -57.7 -49.6 -57.0 64 -99 SPO 1997 10 23 17 09 110 3.1 -9 677.60 -58.0 -49.5 -57.2 67 -99 SPO 1997 10 23 17 10 108 3.2 -9 677.60 -58.1 -49.5 -57.3 68 -99 SPO 1997 10 23 17 11 110 3.0 -9 677.60 -58.2 -49.4 -57.4 68 -99 SPO 1997 10 23 17 12 113 3.0 -9 677.60 -58.2 -49.3 -57.4 68 -99 SPO 1997 10 23 17 13 112 3.0 -9 677.60 -58.1 -49.3 -57.3 67 -99 SPO 1997 10 23 17 14 109 3.1 -9 677.60 -58.1 -49.2 -57.3 66 -99 SPO 1997 10 23 17 15 109 3.1 -9 677.60 -58.2 -49.1 -57.4 66 -99 SPO 1997 10 23 17 16 110 3.1 -9 677.60 -58.1 -49.1 -57.4 66 -99 SPO 1997 10 23 17 17 111 3.2 -9 677.60 -58.0 -49.1 -57.3 63 -99 SPO 1997 10 23 17 18 111 3.2 -9 677.60 -58.0 -49.0 -57.2 63 -99 SPO 1997 10 23 17 19 110 3.4 -9 677.60 -57.9 -48.8 -57.2 64 -99 SPO 1997 10 23 17 20 106 3.4 -9 677.50 -57.8 -48.6 -57.2 64 -99 SPO 1997 10 23 17 21 107 3.5 -9 677.50 -57.8 -48.5 -57.1 65 -99 SPO 1997 10 23 17 22 111 3.5 -9 677.60 -57.8 -48.4 -57.1 66 -99 SPO 1997 10 23 17 23 117 3.5 -9 677.60 -57.7 -48.6 -57.1 66 -99 SPO 1997 10 23 17 24 120 3.6 -9 677.70 -57.8 -48.8 -57.1 67 -99 SPO 1997 10 23 17 25 121 3.5 -9 677.70 -57.8 -49.1 -57.2 67 -99 SPO 1997 10 23 17 26 122 3.5 -9 677.70 -57.8 -49.1 -57.2 67 -99 SPO 1997 10 23 17 27 125 3.5 -9 677.70 -57.8 -49.2 -57.2 67 -99 SPO 1997 10 23 17 28 128 3.6 -9 677.70 -57.7 -49.4 -57.2 65 -99 SPO 1997 10 23 17 29 126 3.8 -9 677.70 -57.7 -49.7 -57.2 65 -99 SPO 1997 10 23 17 30 127 3.9 -9 677.70 -57.9 -49.6 -57.4 66 -99 SPO 1997 10 23 17 31 130 4.1 -9 677.70 -58.0 -49.6 -57.4 66 -99 SPO 1997 10 23 17 32 128 4.1 -9 677.70 -57.9 -49.8 -57.4 67 -99 SPO 1997 10 23 17 33 125 4.0 -9 677.70 -58.0 -49.8 -57.4 67 -99 SPO 1997 10 23 17 34 124 4.0 -9 677.70 -58.0 -49.7 -57.5 67 -99 SPO 1997 10 23 17 35 126 3.9 -9 677.70 -58.0 -49.6 -57.5 67 -99 SPO 1997 10 23 17 36 121 4.0 -9 677.70 -58.0 -49.6 -57.4 67 -99 SPO 1997 10 23 17 37 122 3.9 -9 677.70 -58.0 -49.3 -57.4 67 -99 SPO 1997 10 23 17 38 121 4.0 -9 677.70 -58.0 -49.4 -57.4 66 -99 SPO 1997 10 23 17 39 127 3.9 -9 677.70 -58.0 -49.4 -57.4 66 -99 SPO 1997 10 23 17 40 129 3.9 -9 677.70 -57.9 -49.8 -57.3 65 -99 SPO 1997 10 23 17 41 132 3.9 -9 677.70 -57.8 -50.1 -57.3 64 -99 SPO 1997 10 23 17 42 136 3.7 -9 677.80 -57.6 -50.4 -57.0 63 -99 SPO 1997 10 23 17 43 135 3.7 -9 677.80 -57.2 -50.3 -56.6 60 -99 SPO 1997 10 23 17 44 136 3.5 -9 677.80 -57.1 -50.0 -56.6 62 -99 SPO 1997 10 23 17 45 139 3.1 -9 677.80 -57.2 -50.2 -56.6 64 -99 SPO 1997 10 23 17 46 137 3.2 -9 677.80 -57.2 -50.2 -56.6 64 -99 SPO 1997 10 23 17 47 139 3.4 -9 677.80 -57.1 -50.3 -56.6 64 -99 SPO 1997 10 23 17 48 137 3.7 -9 677.80 -57.2 -50.3 -56.6 65 -99 SPO 1997 10 23 17 49 140 3.4 -9 677.80 -57.1 -50.3 -56.5 65 -99 SPO 1997 10 23 17 50 140 3.4 -9 677.80 -57.1 -50.5 -56.6 65 -99 SPO 1997 10 23 17 51 137 3.8 -9 677.80 -57.1 -50.4 -56.5 66 -99 SPO 1997 10 23 17 52 136 3.9 -9 677.80 -57.3 -50.0 -56.6 67 -99 SPO 1997 10 23 17 53 137 3.9 -9 677.80 -57.2 -49.8 -56.6 65 -99 SPO 1997 10 23 17 54 131 4.0 -9 677.80 -57.2 -49.8 -56.6 65 -99 SPO 1997 10 23 17 55 130 4.1 -9 677.80 -57.6 -49.8 -57.0 68 -99 SPO 1997 10 23 17 56 124 4.0 -9 677.80 -57.8 -49.7 -57.2 70 -99 SPO 1997 10 23 17 57 118 4.0 -9 677.80 -57.9 -49.6 -57.2 69 -99 SPO 1997 10 23 17 58 118 3.9 -9 677.80 -57.9 -49.5 -57.3 69 -99 SPO 1997 10 23 17 59 118 3.8 -9 677.80 -57.9 -49.5 -57.2 68 -99 SPO 1997 10 23 18 00 117 3.8 -9 677.80 -57.9 -49.6 -57.2 67 0 SPO 1997 10 23 18 01 117 3.8 -9 677.80 -57.8 -49.6 -57.2 67 -99 SPO 1997 10 23 18 02 117 3.9 -9 677.80 -57.8 -49.6 -57.2 66 -99 SPO 1997 10 23 18 03 117 3.9 -9 677.80 -57.8 -49.8 -57.2 65 -99 SPO 1997 10 23 18 04 120 3.9 -9 677.80 -57.8 -49.9 -57.2 65 -99 SPO 1997 10 23 18 05 122 3.9 -9 677.80 -57.8 -50.1 -57.2 64 -99 SPO 1997 10 23 18 06 124 3.8 -9 677.80 -57.8 -50.2 -57.2 64 -99 SPO 1997 10 23 18 07 124 3.9 -9 677.80 -57.8 -50.3 -57.2 63 -99 SPO 1997 10 23 18 08 124 4.0 -9 677.80 -57.8 -50.4 -57.2 64 -99 SPO 1997 10 23 18 09 127 3.9 -9 677.80 -57.8 -50.5 -57.2 65 -99 SPO 1997 10 23 18 10 134 3.8 -9 677.80 -57.7 -50.9 -57.1 64 -99 SPO 1997 10 23 18 11 136 3.8 -9 677.80 -57.5 -51.4 -56.9 63 -99 SPO 1997 10 23 18 12 134 3.8 -9 677.80 -57.5 -51.6 -56.8 64 -99 SPO 1997 10 23 18 13 132 3.9 -9 677.80 -57.7 -51.4 -57.1 67 -99 SPO 1997 10 23 18 14 137 3.8 -9 677.80 -57.8 -51.4 -57.3 67 -99 SPO 1997 10 23 18 15 142 3.6 -9 677.80 -57.7 -51.8 -57.2 66 -99 SPO 1997 10 23 18 16 153 3.6 -9 677.80 -57.6 -53.0 -57.1 64 -99 SPO 1997 10 23 18 17 147 3.5 -9 677.80 -57.8 -53.4 -57.2 65 -99 SPO 1997 10 23 18 18 143 3.1 -9 677.80 -57.6 -52.9 -57.1 63 -99 SPO 1997 10 23 18 19 139 3.3 -9 677.80 -57.6 -52.4 -57.0 62 -99 SPO 1997 10 23 18 20 136 3.7 -9 677.80 -57.7 -51.7 -57.2 63 -99 SPO 1997 10 23 18 21 135 3.6 -9 677.80 -57.8 -51.2 -57.4 64 -99 SPO 1997 10 23 18 22 130 3.5 -9 677.70 -58.0 -50.8 -57.5 65 -99 SPO 1997 10 23 18 23 129 3.5 -9 677.70 -58.1 -50.6 -57.6 66 -99 SPO 1997 10 23 18 24 126 3.5 -9 677.70 -58.1 -50.7 -57.6 64 -99 SPO 1997 10 23 18 25 123 3.5 -9 677.70 -58.1 -50.6 -57.6 64 -99 SPO 1997 10 23 18 26 123 3.4 -9 677.60 -58.0 -50.6 -57.6 63 -99 SPO 1997 10 23 18 27 123 3.4 -9 677.60 -58.0 -50.5 -57.5 63 -99 SPO 1997 10 23 18 28 120 3.4 -9 677.60 -57.8 -50.4 -57.4 63 -99 SPO 1997 10 23 18 29 123 3.3 -9 677.70 -57.8 -50.2 -57.4 62 -99 SPO 1997 10 23 18 30 124 3.3 -9 677.70 -57.6 -50.2 -57.3 62 -99 SPO 1997 10 23 18 31 117 3.3 -9 677.60 -57.6 -50.1 -57.2 62 -99 SPO 1997 10 23 18 32 111 3.4 -9 677.60 -57.5 -49.9 -57.0 62 -99 SPO 1997 10 23 18 33 112 3.3 -9 677.60 -57.4 -49.8 -56.9 62 -99 SPO 1997 10 23 18 34 111 3.4 -9 677.60 -57.3 -49.8 -56.8 63 -99 SPO 1997 10 23 18 35 106 3.4 -9 677.60 -57.3 -49.8 -56.6 63 -99 SPO 1997 10 23 18 36 106 3.3 -9 677.60 -57.3 -49.7 -56.4 64 -99 SPO 1997 10 23 18 37 107 3.1 -9 677.60 -57.2 -49.7 -56.4 65 -99 SPO 1997 10 23 18 38 110 3.0 -9 677.60 -57.2 -49.7 -56.3 65 -99 SPO 1997 10 23 18 39 114 3.0 -9 677.60 -57.1 -49.6 -56.4 64 -99 SPO 1997 10 23 18 40 120 3.0 -9 677.60 -57.1 -49.6 -56.4 65 -99 SPO 1997 10 23 18 41 123 3.0 -9 677.60 -57.1 -49.7 -56.5 65 -99 SPO 1997 10 23 18 42 116 3.1 -9 677.60 -57.1 -49.8 -56.5 66 -99 SPO 1997 10 23 18 43 109 3.1 -9 677.50 -57.0 -49.7 -56.3 65 -99 SPO 1997 10 23 18 44 112 3.0 -9 677.60 -57.0 -49.6 -56.1 66 -99 SPO 1997 10 23 18 45 114 3.1 -9 677.60 -57.0 -49.6 -56.2 67 -99 SPO 1997 10 23 18 46 109 3.0 -9 677.50 -57.0 -49.6 -56.2 67 -99 SPO 1997 10 23 18 47 106 3.0 -9 677.50 -57.0 -49.6 -56.0 68 -99 SPO 1997 10 23 18 48 107 3.0 -9 677.50 -57.1 -49.7 -56.0 68 -99 SPO 1997 10 23 18 49 106 3.0 -9 677.50 -57.0 -49.9 -56.1 68 -99 SPO 1997 10 23 18 50 103 3.0 -9 677.50 -57.1 -50.0 -56.0 68 -99 SPO 1997 10 23 18 51 102 3.0 -9 677.50 -57.1 -49.9 -56.0 68 -99 SPO 1997 10 23 18 52 103 3.0 -9 677.50 -57.1 -50.2 -56.0 67 -99 SPO 1997 10 23 18 53 101 3.0 -9 677.40 -57.2 -50.9 -56.0 68 -99 SPO 1997 10 23 18 54 100 3.0 -9 677.40 -57.2 -51.1 -55.9 68 -99 SPO 1997 10 23 18 55 102 3.0 -9 677.40 -57.2 -51.6 -55.9 68 -99 SPO 1997 10 23 18 56 103 3.1 -9 677.40 -57.2 -52.4 -56.0 68 -99 SPO 1997 10 23 18 57 100 3.0 -9 677.40 -57.2 -52.7 -55.9 67 -99 SPO 1997 10 23 18 58 99 2.9 -9 677.30 -57.2 -52.6 -55.8 67 -99 SPO 1997 10 23 18 59 99 2.9 -9 677.30 -57.2 -52.4 -55.8 67 -99 SPO 1997 10 23 19 00 95 2.9 -9 677.40 -57.2 -52.0 -55.8 68 0 SPO 1997 10 23 19 01 94 2.9 -9 677.40 -57.2 -51.5 -55.8 67 -99 SPO 1997 10 23 19 02 92 3.0 -9 677.30 -57.2 -51.2 -55.7 67 -99 SPO 1997 10 23 19 03 91 2.9 -9 677.30 -57.2 -51.0 -55.7 67 -99 SPO 1997 10 23 19 04 91 2.9 -9 677.30 -57.3 -50.8 -55.6 67 -99 SPO 1997 10 23 19 05 92 2.8 -9 677.30 -57.3 -50.6 -55.7 67 -99 SPO 1997 10 23 19 06 92 2.8 -9 677.30 -57.3 -50.6 -55.7 67 -99 SPO 1997 10 23 19 07 94 2.7 -9 677.30 -57.3 -50.4 -55.8 66 -99 SPO 1997 10 23 19 08 102 2.5 -9 677.40 -57.3 -50.6 -56.0 66 -99 SPO 1997 10 23 19 09 106 2.5 -9 677.40 -57.3 -50.9 -56.2 64 -99 SPO 1997 10 23 19 10 102 2.5 -9 677.40 -57.3 -51.0 -56.3 64 -99 SPO 1997 10 23 19 11 93 2.8 -9 677.30 -57.3 -50.9 -56.2 64 -99 SPO 1997 10 23 19 12 86 3.0 -9 677.30 -57.3 -50.3 -55.9 65 -99 SPO 1997 10 23 19 13 84 3.1 -9 677.30 -57.4 -49.9 -55.7 66 -99 SPO 1997 10 23 19 14 87 2.9 -9 677.30 -57.4 -50.2 -55.6 66 -99 SPO 1997 10 23 19 15 89 2.6 -9 677.30 -57.4 -50.6 -55.7 66 -99 SPO 1997 10 23 19 16 85 2.7 -9 677.30 -57.4 -50.8 -55.6 65 -99 SPO 1997 10 23 19 17 80 2.9 -9 677.30 -57.4 -50.6 -55.6 66 -99 SPO 1997 10 23 19 18 76 3.0 -9 677.30 -57.4 -49.5 -55.5 66 -99 SPO 1997 10 23 19 19 77 3.0 -9 677.20 -57.3 -48.8 -55.5 66 -99 SPO 1997 10 23 19 20 77 3.1 -9 677.20 -57.3 -48.4 -55.5 66 -99 SPO 1997 10 23 19 21 78 3.2 -9 677.20 -57.3 -48.2 -55.5 66 -99 SPO 1997 10 23 19 22 80 3.0 -9 677.30 -57.4 -48.4 -55.5 65 -99 SPO 1997 10 23 19 23 83 2.9 -9 677.30 -57.4 -48.6 -55.5 65 -99 SPO 1997 10 23 19 24 84 2.8 -9 677.30 -57.3 -49.2 -55.5 63 -99 SPO 1997 10 23 19 25 86 2.7 -9 677.30 -57.4 -49.9 -55.6 64 -99 SPO 1997 10 23 19 26 89 2.7 -9 677.30 -57.4 -50.2 -55.9 64 -99 SPO 1997 10 23 19 27 90 2.9 -9 677.30 -57.4 -50.4 -56.0 64 -99 SPO 1997 10 23 19 28 87 3.1 -9 677.30 -57.3 -50.4 -55.9 63 -99 SPO 1997 10 23 19 29 86 3.1 -9 677.30 -57.4 -50.3 -55.8 65 -99 SPO 1997 10 23 19 30 89 3.0 -9 677.30 -57.4 -50.2 -55.8 66 -99 SPO 1997 10 23 19 31 90 2.9 -9 677.30 -57.3 -50.3 -55.8 65 -99 SPO 1997 10 23 19 32 87 3.0 -9 677.40 -57.3 -50.4 -55.8 65 -99 SPO 1997 10 23 19 33 86 3.0 -9 677.40 -57.2 -50.2 -55.6 64 -99 SPO 1997 10 23 19 34 86 3.1 -9 677.40 -57.3 -49.9 -55.5 65 -99 SPO 1997 10 23 19 35 84 3.4 -9 677.30 -57.3 -49.6 -55.5 65 -99 SPO 1997 10 23 19 36 83 3.5 -9 677.30 -57.3 -48.8 -55.5 65 -99 SPO 1997 10 23 19 37 82 3.5 -9 677.30 -57.3 -48.0 -55.4 65 -99 SPO 1997 10 23 19 38 80 3.5 -9 677.30 -57.3 -47.6 -55.4 66 -99 SPO 1997 10 23 19 39 81 3.3 -9 677.40 -57.2 -47.4 -55.3 65 -99 SPO 1997 10 23 19 40 85 3.0 -9 677.40 -57.2 -47.2 -55.2 66 -99 SPO 1997 10 23 19 41 86 3.0 -9 677.40 -57.1 -47.2 -55.0 65 -99 SPO 1997 10 23 19 42 84 3.2 -9 677.40 -57.1 -47.2 -55.0 66 -99 SPO 1997 10 23 19 43 84 3.2 -9 677.40 -57.1 -47.1 -55.0 66 -99 SPO 1997 10 23 19 44 85 3.1 -9 677.40 -57.1 -47.0 -54.9 66 -99 SPO 1997 10 23 19 45 85 3.2 -9 677.40 -57.1 -47.0 -54.9 66 -99 SPO 1997 10 23 19 46 87 3.0 -9 677.40 -57.0 -47.0 -54.8 65 -99 SPO 1997 10 23 19 47 93 3.0 -9 677.50 -57.0 -47.0 -54.9 64 -99 SPO 1997 10 23 19 48 95 3.0 -9 677.50 -57.0 -47.2 -55.1 64 -99 SPO 1997 10 23 19 49 95 3.1 -9 677.50 -56.9 -47.2 -55.2 63 -99 SPO 1997 10 23 19 50 95 3.1 -9 677.40 -57.0 -47.2 -55.2 64 -99 SPO 1997 10 23 19 51 96 3.0 -9 677.40 -57.1 -47.2 -55.2 66 -99 SPO 1997 10 23 19 52 99 3.0 -9 677.40 -57.1 -47.2 -55.4 66 -99 SPO 1997 10 23 19 53 100 2.9 -9 677.40 -57.0 -47.3 -55.6 66 -99 SPO 1997 10 23 19 54 99 2.9 -9 677.40 -57.0 -47.3 -55.6 67 -99 SPO 1997 10 23 19 55 98 2.9 -9 677.40 -57.0 -47.3 -55.5 67 -99 SPO 1997 10 23 19 56 98 2.9 -9 677.40 -57.1 -47.3 -55.5 68 -99 SPO 1997 10 23 19 57 99 2.8 -9 677.40 -57.2 -47.4 -55.6 68 -99 SPO 1997 10 23 19 58 101 2.9 -9 677.40 -57.2 -47.4 -55.7 68 -99 SPO 1997 10 23 19 59 101 2.9 -9 677.40 -57.2 -47.6 -55.8 68 -99 SPO 1997 10 23 20 00 100 2.9 -9 677.30 -57.2 -47.7 -55.7 68 0 SPO 1997 10 23 20 01 102 2.8 -9 677.30 -57.3 -47.7 -55.8 69 -99 SPO 1997 10 23 20 02 105 2.8 -9 677.30 -57.2 -47.8 -56.0 68 -99 SPO 1997 10 23 20 03 105 2.9 -9 677.30 -57.3 -48.2 -56.1 67 -99 SPO 1997 10 23 20 04 101 2.9 -9 677.30 -57.3 -48.4 -56.1 67 -99 SPO 1997 10 23 20 05 103 2.9 -9 677.30 -57.4 -48.4 -56.1 67 -99 SPO 1997 10 23 20 06 111 2.8 -9 677.30 -57.4 -49.0 -56.4 67 -99 SPO 1997 10 23 20 07 118 2.7 -9 677.40 -57.4 -50.0 -56.4 67 -99 SPO 1997 10 23 20 08 120 2.7 -9 677.40 -57.0 -50.6 -56.2 65 -99 SPO 1997 10 23 20 09 114 2.7 -9 677.40 -56.8 -50.6 -56.0 64 -99 SPO 1997 10 23 20 10 106 2.8 -9 677.40 -57.1 -49.8 -56.2 68 -99 SPO 1997 10 23 20 11 104 2.8 -9 677.40 -57.5 -49.0 -56.6 71 -99 SPO 1997 10 23 20 12 108 2.7 -9 677.40 -57.6 -48.7 -56.7 70 -99 SPO 1997 10 23 20 13 113 2.6 -9 677.40 -57.6 -48.7 -56.7 68 -99 SPO 1997 10 23 20 14 115 2.7 -9 677.30 -57.4 -48.6 -56.5 66 -99 SPO 1997 10 23 20 15 118 2.8 -9 677.30 -57.3 -48.8 -56.4 65 -99 SPO 1997 10 23 20 16 120 2.8 -9 677.30 -57.2 -48.9 -56.3 64 -99 SPO 1997 10 23 20 17 117 2.8 -9 677.30 -57.2 -48.6 -56.3 64 -99 SPO 1997 10 23 20 18 110 2.9 -9 677.30 -57.4 -48.1 -56.6 67 -99 SPO 1997 10 23 20 19 107 2.9 -9 677.30 -57.6 -47.8 -56.9 68 -99 SPO 1997 10 23 20 20 109 2.9 -9 677.20 -57.7 -47.6 -56.9 68 -99 SPO 1997 10 23 20 21 109 2.9 -9 677.20 -57.7 -47.4 -56.9 67 -99 SPO 1997 10 23 20 22 107 2.9 -9 677.20 -57.7 -47.2 -56.9 67 -99 SPO 1997 10 23 20 23 107 2.8 -9 677.20 -57.7 -47.0 -56.9 66 -99 SPO 1997 10 23 20 24 111 2.7 -9 677.30 -57.7 -47.0 -56.9 66 -99 SPO 1997 10 23 20 25 114 2.5 -9 677.30 -57.8 -47.2 -57.0 67 -99 SPO 1997 10 23 20 26 112 2.6 -9 677.30 -57.8 -47.3 -57.0 67 -99 SPO 1997 10 23 20 27 109 2.6 -9 677.30 -57.7 -47.2 -57.0 64 -99 SPO 1997 10 23 20 28 108 2.7 -9 677.30 -57.7 -47.1 -57.0 64 -99 SPO 1997 10 23 20 29 111 2.6 -9 677.30 -57.8 -47.0 -57.1 65 -99 SPO 1997 10 23 20 30 116 2.6 -9 677.30 -57.8 -47.1 -57.1 65 -99 SPO 1997 10 23 20 31 125 2.6 -9 677.30 -57.5 -47.3 -57.0 63 -99 SPO 1997 10 23 20 32 131 2.7 -9 677.30 -56.8 -47.7 -56.4 60 -99 SPO 1997 10 23 20 33 130 2.8 -9 677.30 -56.6 -48.4 -56.1 60 -99 SPO 1997 10 23 20 34 123 2.8 -9 677.30 -56.4 -48.5 -56.0 60 -99 SPO 1997 10 23 20 35 120 2.9 -9 677.30 -56.4 -48.0 -56.0 62 -99 SPO 1997 10 23 20 36 115 2.9 -9 677.20 -56.6 -47.8 -56.2 65 -99 SPO 1997 10 23 20 37 108 2.9 -9 677.20 -57.3 -47.6 -56.8 71 -99 SPO 1997 10 23 20 38 101 2.9 -9 677.30 -57.6 -47.3 -57.1 71 -99 SPO 1997 10 23 20 39 98 3.0 -9 677.20 -57.7 -47.1 -57.1 69 -99 SPO 1997 10 23 20 40 91 3.1 -9 677.20 -57.7 -46.9 -57.0 66 -99 SPO 1997 10 23 20 41 87 3.3 -9 677.20 -57.6 -46.8 -56.8 64 -99 SPO 1997 10 23 20 42 84 3.4 -9 677.20 -57.6 -46.6 -56.6 64 -99 SPO 1997 10 23 20 43 82 3.4 -9 677.10 -57.6 -46.5 -56.6 65 -99 SPO 1997 10 23 20 44 81 3.3 -9 677.10 -57.5 -46.4 -56.6 64 -99 SPO 1997 10 23 20 45 80 3.1 -9 677.10 -57.5 -46.4 -56.5 65 -99 SPO 1997 10 23 20 46 80 2.9 -9 677.10 -57.4 -46.6 -56.4 65 -99 SPO 1997 10 23 20 47 82 2.9 -9 677.20 -57.4 -46.6 -56.4 65 -99 SPO 1997 10 23 20 48 83 2.8 -9 677.20 -57.4 -46.6 -56.4 65 -99 SPO 1997 10 23 20 49 80 3.0 -9 677.10 -57.3 -46.6 -56.4 64 -99 SPO 1997 10 23 20 50 78 3.2 -9 677.10 -57.3 -46.4 -56.4 64 -99 SPO 1997 10 23 20 51 82 3.0 -9 677.10 -57.2 -46.3 -56.3 63 -99 SPO 1997 10 23 20 52 85 3.0 -9 677.10 -57.2 -46.3 -56.4 63 -99 SPO 1997 10 23 20 53 83 3.2 -9 677.10 -57.2 -46.3 -56.5 63 -99 SPO 1997 10 23 20 54 81 3.3 -9 677.00 -57.1 -46.2 -56.4 63 -99 SPO 1997 10 23 20 55 80 3.3 -9 677.00 -57.1 -46.2 -56.3 63 -99 SPO 1997 10 23 20 56 78 3.5 -9 677.00 -57.1 -46.2 -56.2 63 -99 SPO 1997 10 23 20 57 76 3.7 -9 676.90 -57.0 -46.1 -56.2 63 -99 SPO 1997 10 23 20 58 75 3.7 -9 676.90 -56.9 -46.0 -56.2 63 -99 SPO 1997 10 23 20 59 76 3.7 -9 676.90 -56.8 -46.1 -56.1 64 -99 SPO 1997 10 23 21 00 76 3.9 -9 676.90 -56.8 -46.1 -56.0 65 0 SPO 1997 10 23 21 01 74 4.1 -9 676.90 -56.7 -46.1 -56.0 65 -99 SPO 1997 10 23 21 02 72 4.0 -9 676.80 -56.6 -46.1 -56.0 65 -99 SPO 1997 10 23 21 03 74 3.9 -9 676.80 -56.5 -46.1 -55.9 64 -99 SPO 1997 10 23 21 04 77 3.8 -9 676.90 -56.4 -46.1 -55.8 64 -99 SPO 1997 10 23 21 05 79 3.5 -9 676.90 -56.4 -46.2 -55.8 64 -99 SPO 1997 10 23 21 06 82 3.3 -9 676.90 -56.4 -46.3 -55.7 64 -99 SPO 1997 10 23 21 07 82 3.2 -9 676.90 -56.3 -46.4 -55.6 64 -99 SPO 1997 10 23 21 08 82 3.2 -9 676.90 -56.3 -46.4 -55.6 64 -99 SPO 1997 10 23 21 09 83 3.1 -9 676.90 -56.3 -46.4 -55.6 64 -99 SPO 1997 10 23 21 10 87 3.0 -9 676.90 -56.3 -46.5 -55.7 64 -99 SPO 1997 10 23 21 11 92 2.9 -9 677.00 -56.3 -46.7 -55.8 65 -99 SPO 1997 10 23 21 12 93 2.9 -9 677.00 -56.4 -47.2 -56.0 66 -99 SPO 1997 10 23 21 13 94 2.9 -9 676.90 -56.4 -47.6 -56.0 66 -99 SPO 1997 10 23 21 14 96 2.8 -9 676.90 -56.5 -47.8 -56.1 68 -99 SPO 1997 10 23 21 15 99 2.9 -9 676.90 -56.6 -48.0 -56.2 68 -99 SPO 1997 10 23 21 16 104 2.7 -9 677.00 -56.4 -48.0 -56.1 65 -99 SPO 1997 10 23 21 17 109 2.6 -9 677.00 -56.2 -48.2 -56.0 63 -99 SPO 1997 10 23 21 18 120 2.6 -9 677.00 -56.1 -48.4 -55.8 63 -99 SPO 1997 10 23 21 19 126 2.6 -9 677.00 -56.0 -49.0 -55.7 62 -99 SPO 1997 10 23 21 20 120 2.6 -9 677.00 -56.0 -49.3 -55.7 63 -99 SPO 1997 10 23 21 21 117 2.5 -9 677.00 -55.9 -49.2 -55.6 63 -99 SPO 1997 10 23 21 22 115 2.5 -9 677.00 -56.1 -49.0 -55.9 65 -99 SPO 1997 10 23 21 23 119 2.6 -9 677.00 -56.0 -49.0 -55.8 65 -99 SPO 1997 10 23 21 24 121 2.6 -9 677.00 -55.9 -49.0 -55.6 65 -99 SPO 1997 10 23 21 25 115 2.6 -9 677.00 -56.0 -48.9 -55.7 65 -99 SPO 1997 10 23 21 26 113 2.5 -9 677.00 -56.4 -48.6 -56.0 69 -99 SPO 1997 10 23 21 27 114 2.5 -9 677.00 -56.7 -48.2 -56.3 69 -99 SPO 1997 10 23 21 28 125 2.5 -9 677.00 -56.6 -48.2 -56.2 67 -99 SPO 1997 10 23 21 29 129 2.5 -9 677.00 -56.2 -48.5 -55.9 64 -99 SPO 1997 10 23 21 30 135 2.4 -9 677.00 -56.2 -48.6 -55.8 64 -99 SPO 1997 10 23 21 31 140 2.3 -9 677.00 -56.2 -48.9 -55.8 64 -99 SPO 1997 10 23 21 32 135 2.6 -9 677.00 -56.1 -48.9 -55.8 63 -99 SPO 1997 10 23 21 33 133 2.6 -9 677.00 -56.1 -48.7 -55.8 63 -99 SPO 1997 10 23 21 34 125 2.5 -9 677.00 -56.3 -48.2 -55.9 64 -99 SPO 1997 10 23 21 35 125 2.5 -9 677.00 -56.8 -47.9 -56.4 68 -99 SPO 1997 10 23 21 36 127 2.5 -9 677.00 -57.0 -47.9 -56.6 69 -99 SPO 1997 10 23 21 37 131 2.6 -9 677.00 -56.8 -48.2 -56.4 66 -99 SPO 1997 10 23 21 38 126 2.5 -9 677.00 -56.8 -48.5 -56.4 65 -99 SPO 1997 10 23 21 39 119 2.5 -9 676.90 -57.2 -48.5 -56.7 68 -99 SPO 1997 10 23 21 40 113 2.6 -9 676.90 -57.3 -48.4 -56.8 67 -99 SPO 1997 10 23 21 41 112 2.6 -9 676.90 -57.4 -48.4 -56.8 67 -99 SPO 1997 10 23 21 42 113 2.5 -9 676.90 -57.4 -48.3 -56.8 65 -99 SPO 1997 10 23 21 43 114 2.4 -9 676.90 -57.4 -48.3 -56.9 64 -99 SPO 1997 10 23 21 44 111 2.5 -9 676.90 -57.4 -48.1 -56.9 64 -99 SPO 1997 10 23 21 45 106 2.5 -9 676.90 -57.5 -47.9 -56.9 64 -99 SPO 1997 10 23 21 46 104 2.6 -9 676.90 -57.5 -47.8 -56.9 64 -99 SPO 1997 10 23 21 47 105 2.6 -9 676.90 -57.6 -47.8 -57.0 65 -99 SPO 1997 10 23 21 48 101 2.6 -9 676.80 -57.6 -47.6 -57.0 64 -99 SPO 1997 10 23 21 49 99 2.7 -9 676.80 -57.6 -47.3 -56.9 63 -99 SPO 1997 10 23 21 50 100 2.7 -9 676.80 -57.6 -47.4 -56.9 63 -99 SPO 1997 10 23 21 51 106 2.7 -9 676.80 -57.7 -47.7 -57.0 63 -99 SPO 1997 10 23 21 52 109 2.8 -9 676.80 -57.7 -47.9 -57.2 63 -99 SPO 1997 10 23 21 53 108 2.8 -9 676.80 -57.7 -48.0 -57.3 63 -99 SPO 1997 10 23 21 54 111 2.8 -9 676.80 -57.7 -48.0 -57.3 63 -99 SPO 1997 10 23 21 55 131 3.0 -9 676.80 -57.6 -48.4 -57.2 60 -99 SPO 1997 10 23 21 56 124 3.0 -9 676.80 -57.1 -49.0 -56.9 58 -99 SPO 1997 10 23 21 57 117 3.0 -9 676.80 -57.3 -48.4 -57.0 60 -99 SPO 1997 10 23 21 58 106 3.1 -9 676.80 -57.6 -48.1 -57.3 63 -99 SPO 1997 10 23 21 59 100 3.0 -9 676.80 -57.7 -47.9 -57.4 63 -99 SPO 1997 10 23 22 00 99 3.0 -9 676.70 -57.7 -47.6 -57.3 63 0 SPO 1997 10 23 22 01 106 2.9 -9 676.70 -57.7 -47.7 -57.3 63 -99 SPO 1997 10 23 22 02 115 2.8 -9 676.70 -57.6 -48.0 -57.3 62 -99 SPO 1997 10 23 22 03 114 2.6 -9 676.80 -57.0 -48.2 -56.9 58 -99 SPO 1997 10 23 22 04 113 2.6 -9 676.80 -56.6 -48.1 -56.4 58 -99 SPO 1997 10 23 22 05 109 2.6 -9 676.80 -56.5 -48.0 -56.4 59 -99 SPO 1997 10 23 22 06 108 2.6 -9 676.80 -56.8 -47.8 -56.6 62 -99 SPO 1997 10 23 22 07 110 2.6 -9 676.80 -56.9 -47.7 -56.8 63 -99 SPO 1997 10 23 22 08 117 2.5 -9 676.80 -56.6 -47.8 -56.5 60 -99 SPO 1997 10 23 22 09 111 2.5 -9 676.80 -56.4 -47.8 -56.2 60 -99 SPO 1997 10 23 22 10 110 2.5 -9 676.80 -56.4 -47.6 -56.4 61 -99 SPO 1997 10 23 22 11 117 2.4 -9 676.80 -56.2 -47.6 -56.1 61 -99 SPO 1997 10 23 22 12 131 2.5 -9 676.80 -56.6 -48.2 -56.2 64 -99 SPO 1997 10 23 22 13 114 2.4 -9 676.80 -56.4 -48.5 -56.2 61 -99 SPO 1997 10 23 22 14 115 2.5 -9 676.70 -56.2 -48.2 -56.0 61 -99 SPO 1997 10 23 22 15 115 2.5 -9 676.70 -56.2 -48.4 -56.0 61 -99 SPO 1997 10 23 22 16 113 2.6 -9 676.70 -56.4 -48.3 -56.2 64 -99 SPO 1997 10 23 22 17 116 2.6 -9 676.70 -56.4 -48.5 -56.2 64 -99 SPO 1997 10 23 22 18 100 2.5 -9 676.70 -56.8 -48.2 -56.4 68 -99 SPO 1997 10 23 22 19 98 2.5 -9 676.70 -57.2 -47.7 -56.8 69 -99 SPO 1997 10 23 22 20 94 2.5 -9 676.60 -57.2 -47.5 -56.8 67 -99 SPO 1997 10 23 22 21 84 2.7 -9 676.60 -57.3 -47.2 -56.8 66 -99 SPO 1997 10 23 22 22 80 3.0 -9 676.50 -57.2 -46.8 -56.6 64 -99 SPO 1997 10 23 22 23 79 3.1 -9 676.50 -57.2 -46.6 -56.5 64 -99 SPO 1997 10 23 22 24 78 3.2 -9 676.50 -57.2 -46.6 -56.4 64 -99 SPO 1997 10 23 22 25 76 3.3 -9 676.50 -57.2 -46.4 -56.4 64 -99 SPO 1997 10 23 22 26 75 3.4 -9 676.50 -57.1 -46.3 -56.4 64 -99 SPO 1997 10 23 22 27 76 3.4 -9 676.50 -57.1 -46.2 -56.4 64 -99 SPO 1997 10 23 22 28 77 3.2 -9 676.50 -57.1 -46.1 -56.3 63 -99 SPO 1997 10 23 22 29 78 3.1 -9 676.50 -57.1 -46.1 -56.3 64 -99 SPO 1997 10 23 22 30 79 3.2 -9 676.50 -57.1 -46.1 -56.4 64 -99 SPO 1997 10 23 22 31 77 3.4 -9 676.50 -57.0 -46.1 -56.4 63 -99 SPO 1997 10 23 22 32 74 3.6 -9 676.40 -57.0 -46.0 -56.3 63 -99 SPO 1997 10 23 22 33 71 3.7 -9 676.40 -57.0 -46.0 -56.3 63 -99 SPO 1997 10 23 22 34 69 3.9 -9 676.40 -57.0 -46.0 -56.4 63 -99 SPO 1997 10 23 22 35 68 4.2 -9 676.30 -57.0 -46.0 -56.4 63 -99 SPO 1997 10 23 22 36 66 4.4 -9 676.20 -56.9 -45.9 -56.4 63 -99 SPO 1997 10 23 22 37 64 4.6 -9 676.20 -56.8 -45.8 -56.4 62 -99 SPO 1997 10 23 22 38 64 4.6 -9 676.20 -56.8 -45.7 -56.4 63 -99 SPO 1997 10 23 22 39 64 4.3 -9 676.20 -56.7 -45.7 -56.4 63 -99 SPO 1997 10 23 22 40 66 4.0 -9 676.30 -56.7 -45.8 -56.3 63 -99 SPO 1997 10 23 22 41 67 3.7 -9 676.30 -56.7 -45.8 -56.2 63 -99 SPO 1997 10 23 22 42 68 3.7 -9 676.30 -56.6 -45.8 -56.1 62 -99 SPO 1997 10 23 22 43 68 3.9 -9 676.20 -56.6 -45.8 -56.0 62 -99 SPO 1997 10 23 22 44 66 4.1 -9 676.10 -56.6 -45.8 -56.0 62 -99 SPO 1997 10 23 22 45 65 4.2 -9 676.10 -56.6 -45.8 -56.0 62 -99 SPO 1997 10 23 22 46 66 4.2 -9 676.10 -56.5 -45.7 -56.0 62 -99 SPO 1997 10 23 22 47 67 4.2 -9 676.10 -56.4 -45.6 -56.0 62 -99 SPO 1997 10 23 22 48 68 4.0 -9 676.20 -56.4 -45.6 -55.9 62 -99 SPO 1997 10 23 22 49 70 3.9 -9 676.20 -56.2 -45.6 -55.8 62 -99 SPO 1997 10 23 22 50 71 3.8 -9 676.20 -56.2 -45.6 -55.7 63 -99 SPO 1997 10 23 22 51 74 3.6 -9 676.20 -56.2 -45.5 -55.6 63 -99 SPO 1997 10 23 22 52 76 3.4 -9 676.20 -56.2 -45.4 -55.6 64 -99 SPO 1997 10 23 22 53 77 3.3 -9 676.20 -56.1 -45.4 -55.5 63 -99 SPO 1997 10 23 22 54 78 3.2 -9 676.20 -56.0 -45.5 -55.4 63 -99 SPO 1997 10 23 22 55 78 3.3 -9 676.20 -56.0 -45.4 -55.4 64 -99 SPO 1997 10 23 22 56 77 3.3 -9 676.20 -56.0 -45.4 -55.3 64 -99 SPO 1997 10 23 22 57 78 3.3 -9 676.20 -55.9 -45.4 -55.3 63 -99 SPO 1997 10 23 22 58 76 3.3 -9 676.20 -55.8 -45.4 -55.2 62 -99 SPO 1997 10 23 22 59 74 3.3 -9 676.20 -55.8 -45.4 -55.2 62 -99 SPO 1997 10 23 23 00 75 3.3 -9 676.20 -55.7 -45.3 -55.1 62 0 SPO 1997 10 23 23 01 78 3.2 -9 676.30 -55.7 -45.3 -55.0 63 -99 SPO 1997 10 23 23 02 83 3.0 -9 676.40 -55.8 -45.3 -55.0 65 -99 SPO 1997 10 23 23 03 86 3.0 -9 676.40 -55.8 -45.3 -55.1 65 -99 SPO 1997 10 23 23 04 86 3.1 -9 676.40 -55.7 -45.4 -55.0 65 -99 SPO 1997 10 23 23 05 86 3.4 -9 676.40 -55.8 -45.3 -55.0 65 -99 SPO 1997 10 23 23 06 84 3.4 -9 676.40 -55.8 -45.2 -55.0 65 -99 SPO 1997 10 23 23 07 82 3.5 -9 676.40 -55.9 -45.1 -55.0 66 -99 SPO 1997 10 23 23 08 82 3.5 -9 676.40 -55.9 -45.1 -55.0 66 -99 SPO 1997 10 23 23 09 80 3.5 -9 676.40 -55.9 -45.1 -55.0 66 -99 SPO 1997 10 23 23 10 79 3.5 -9 676.40 -55.8 -45.0 -55.0 65 -99 SPO 1997 10 23 23 11 82 3.3 -9 676.40 -55.7 -45.0 -54.9 64 -99 SPO 1997 10 23 23 12 84 3.2 -9 676.40 -55.7 -45.0 -54.8 64 -99 SPO 1997 10 23 23 13 88 3.0 -9 676.40 -55.6 -45.0 -54.8 63 -99 SPO 1997 10 23 23 14 90 2.9 -9 676.40 -55.5 -45.0 -54.8 63 -99 SPO 1997 10 23 23 15 90 2.9 -9 676.50 -55.4 -45.0 -54.8 62 -99 SPO 1997 10 23 23 16 90 2.9 -9 676.50 -55.3 -45.1 -54.7 62 -99 SPO 1997 10 23 23 17 90 3.1 -9 676.50 -55.3 -45.1 -54.7 63 -99 SPO 1997 10 23 23 18 91 3.1 -9 676.50 -55.4 -45.2 -54.7 65 -99 SPO 1997 10 23 23 19 92 3.0 -9 676.40 -55.4 -45.2 -54.8 65 -99 SPO 1997 10 23 23 20 96 3.1 -9 676.40 -55.5 -45.3 -54.9 66 -99 SPO 1997 10 23 23 21 100 3.0 -9 676.50 -55.5 -45.4 -55.0 65 -99 SPO 1997 10 23 23 22 106 2.9 -9 676.50 -55.6 -45.4 -55.1 66 -99 SPO 1997 10 23 23 23 109 2.9 -9 676.50 -55.6 -45.6 -55.2 66 -99 SPO 1997 10 23 23 24 110 2.9 -9 676.60 -55.5 -45.9 -55.2 65 -99 SPO 1997 10 23 23 25 114 2.9 -9 676.60 -55.5 -46.2 -55.1 65 -99 SPO 1997 10 23 23 26 125 2.9 -9 676.70 -55.2 -46.6 -55.0 63 -99 SPO 1997 10 23 23 27 135 2.8 -9 676.70 -55.0 -47.0 -54.7 62 -99 SPO 1997 10 23 23 28 138 2.4 -9 676.70 -55.1 -47.5 -54.8 63 -99 SPO 1997 10 23 23 29 138 2.3 -9 676.70 -55.2 -47.8 -54.9 64 -99 SPO 1997 10 23 23 30 138 2.5 -9 676.70 -55.0 -48.0 -54.8 62 -99 SPO 1997 10 23 23 31 130 3.0 -9 676.70 -54.8 -48.0 -54.5 61 -99 SPO 1997 10 23 23 32 127 3.0 -9 676.60 -54.7 -47.6 -54.5 62 -99 SPO 1997 10 23 23 33 132 3.1 -9 676.70 -54.9 -47.5 -54.6 64 -99 SPO 1997 10 23 23 34 140 3.0 -9 676.70 -54.6 -48.0 -54.4 63 -99 SPO 1997 10 23 23 35 141 3.0 -9 676.70 -54.3 -48.5 -54.2 61 -99 SPO 1997 10 23 23 36 140 3.2 -9 676.70 -54.3 -48.4 -54.1 62 -99 SPO 1997 10 23 23 37 145 2.8 -9 676.70 -54.3 -49.0 -54.1 63 -99 SPO 1997 10 23 23 38 151 2.7 -9 676.70 -54.3 -49.1 -54.1 63 -99 SPO 1997 10 23 23 39 161 3.7 -9 676.70 -54.6 -49.0 -54.4 66 -99 SPO 1997 10 23 23 40 171 3.9 -9 676.70 -54.9 -49.5 -54.7 67 -99 SPO 1997 10 23 23 41 171 3.9 -9 676.70 -55.0 -50.6 -54.8 67 -99 SPO 1997 10 23 23 42 169 3.6 -9 676.70 -55.0 -50.8 -54.8 66 -99 SPO 1997 10 23 23 43 171 3.7 -9 676.80 -55.0 -51.4 -54.7 66 -99 SPO 1997 10 23 23 44 170 3.7 -9 676.80 -54.9 -52.2 -54.7 66 -99 SPO 1997 10 23 23 45 167 3.5 -9 676.80 -54.8 -52.5 -54.6 65 -99 SPO 1997 10 23 23 46 166 3.6 -9 676.80 -54.7 -52.5 -54.6 64 -99 SPO 1997 10 23 23 47 163 3.5 -9 676.80 -54.6 -52.4 -54.5 64 -99 SPO 1997 10 23 23 48 162 3.5 -9 676.70 -54.6 -52.2 -54.4 64 -99 SPO 1997 10 23 23 49 161 3.6 -9 676.70 -54.4 -52.1 -54.2 63 -99 SPO 1997 10 23 23 50 164 3.6 -9 676.70 -54.4 -51.9 -54.2 63 -99 SPO 1997 10 23 23 51 169 4.0 -9 676.80 -54.4 -52.2 -54.2 63 -99 SPO 1997 10 23 23 52 166 3.8 -9 676.80 -54.3 -52.6 -54.2 63 -99 SPO 1997 10 23 23 53 160 3.4 -9 676.70 -54.3 -52.1 -54.1 63 -99 SPO 1997 10 23 23 54 149 3.5 -9 676.70 -54.2 -51.1 -54.0 64 -99 SPO 1997 10 23 23 55 149 3.6 -9 676.70 -54.0 -50.4 -53.8 63 -99 SPO 1997 10 23 23 56 156 3.6 -9 676.70 -54.0 -50.4 -53.8 64 -99 SPO 1997 10 23 23 57 159 3.6 -9 676.70 -54.1 -50.5 -54.0 66 -99 SPO 1997 10 23 23 58 158 3.3 -9 676.60 -54.2 -51.0 -54.0 -99 -99 SPO 1997 10 23 23 59 150 3.4 -9 676.60 -54.1 -50.8 -54.0 -99 -99 SPO 1997 10 24 00 00 150 3.3 -9 676.60 -54.0 -50.4 -53.8 -99 0 SPO 1997 10 24 00 01 148 3.0 -9 676.60 -54.0 -50.1 -53.8 -99 -99 SPO 1997 10 24 00 02 146 2.9 -9 676.50 -54.0 -50.1 -53.8 -99 -99 SPO 1997 10 24 00 03 138 2.9 -9 676.50 -54.0 -49.8 -53.8 64 -99 SPO 1997 10 24 00 04 134 3.1 -9 676.50 -54.2 -49.4 -54.0 66 -99 SPO 1997 10 24 00 05 137 3.1 -9 676.50 -54.2 -49.6 -54.0 65 -99 SPO 1997 10 24 00 06 136 3.0 -9 676.40 -54.2 -50.2 -54.0 65 -99 SPO 1997 10 24 00 07 132 2.9 -9 676.40 -54.2 -50.3 -54.0 66 -99 SPO 1997 10 24 00 08 126 2.9 -9 676.40 -54.2 -50.2 -54.0 66 -99 SPO 1997 10 24 00 09 123 3.0 -9 676.30 -54.2 -49.9 -53.9 67 -99 SPO 1997 10 24 00 10 122 2.8 -9 676.30 -54.2 -49.7 -53.9 67 -99 SPO 1997 10 24 00 11 121 2.7 -9 676.40 -54.2 -49.8 -53.8 67 -99 SPO 1997 10 24 00 12 122 2.7 -9 676.40 -54.2 -49.9 -53.8 67 -99 SPO 1997 10 24 00 13 121 2.6 -9 676.40 -54.2 -50.0 -53.8 66 -99 SPO 1997 10 24 00 14 117 2.6 -9 676.30 -54.2 -50.0 -53.8 66 -99 SPO 1997 10 24 00 15 118 2.7 -9 676.30 -54.2 -49.8 -53.8 65 -99 SPO 1997 10 24 00 16 119 2.8 -9 676.30 -54.2 -49.8 -53.8 65 -99 SPO 1997 10 24 00 17 117 2.8 -9 676.30 -54.2 -49.8 -53.9 64 -99 SPO 1997 10 24 00 18 115 2.8 -9 676.30 -54.2 -49.7 -53.8 64 -99 SPO 1997 10 24 00 19 117 2.7 -9 676.30 -54.2 -49.5 -53.8 65 -99 SPO 1997 10 24 00 20 120 2.7 -9 676.30 -54.2 -49.4 -53.9 65 -99 SPO 1997 10 24 00 21 123 2.8 -9 676.30 -54.2 -49.3 -54.0 66 -99 SPO 1997 10 24 00 22 124 2.8 -9 676.30 -54.2 -49.2 -54.0 66 -99 SPO 1997 10 24 00 23 121 2.8 -9 676.20 -54.2 -49.1 -54.0 66 -99 SPO 1997 10 24 00 24 116 2.8 -9 676.20 -54.2 -49.0 -54.0 66 -99 SPO 1997 10 24 00 25 112 3.0 -9 676.20 -54.2 -48.8 -53.8 66 -99 SPO 1997 10 24 00 26 111 3.0 -9 676.20 -54.2 -48.7 -53.8 66 -99 SPO 1997 10 24 00 27 111 3.1 -9 676.20 -54.2 -48.6 -53.8 66 -99 SPO 1997 10 24 00 28 110 2.9 -9 676.10 -54.2 -48.5 -53.8 65 -99 SPO 1997 10 24 00 29 108 2.9 -9 676.10 -54.2 -48.4 -53.7 65 -99 SPO 1997 10 24 00 30 106 3.0 -9 676.10 -54.2 -48.4 -53.7 65 -99 SPO 1997 10 24 00 31 104 3.1 -9 676.10 -54.0 -48.3 -53.7 63 -99 SPO 1997 10 24 00 32 101 3.2 -9 676.10 -54.0 -48.4 -53.6 63 -99 SPO 1997 10 24 00 33 98 3.2 -9 676.00 -54.0 -48.4 -53.6 63 -99 SPO 1997 10 24 00 34 96 3.2 -9 676.00 -54.0 -48.3 -53.6 64 -99 SPO 1997 10 24 00 35 96 3.1 -9 676.00 -54.0 -48.4 -53.6 64 -99 SPO 1997 10 24 00 36 95 3.0 -9 676.00 -54.0 -48.4 -53.5 65 -99 SPO 1997 10 24 00 37 92 2.9 -9 676.00 -54.0 -48.4 -53.5 66 -99 SPO 1997 10 24 00 38 92 3.0 -9 676.00 -54.0 -48.4 -53.5 66 -99 SPO 1997 10 24 00 39 92 2.9 -9 676.00 -54.0 -48.4 -53.4 66 -99 SPO 1997 10 24 00 40 93 2.8 -9 676.00 -54.0 -48.4 -53.4 66 -99 SPO 1997 10 24 00 41 92 2.8 -9 675.90 -53.9 -48.4 -53.4 65 -99 SPO 1997 10 24 00 42 89 3.0 -9 675.90 -53.9 -48.4 -53.4 65 -99 SPO 1997 10 24 00 43 87 3.1 -9 675.90 -53.9 -48.4 -53.4 66 -99 SPO 1997 10 24 00 44 88 3.1 -9 675.90 -53.7 -48.2 -53.3 65 -99 SPO 1997 10 24 00 45 89 3.1 -9 675.90 -53.7 -48.2 -53.3 65 -99 SPO 1997 10 24 00 46 91 3.1 -9 675.90 -53.7 -48.2 -53.3 66 -99 SPO 1997 10 24 00 47 88 3.0 -9 675.80 -53.7 -48.1 -53.3 66 -99 SPO 1997 10 24 00 48 88 2.9 -9 675.80 -53.7 -48.0 -53.2 66 -99 SPO 1997 10 24 00 49 88 2.9 -9 675.80 -53.5 -48.0 -53.1 65 -99 SPO 1997 10 24 00 50 86 3.2 -9 675.80 -53.5 -47.9 -53.1 65 -99 SPO 1997 10 24 00 51 83 3.4 -9 675.80 -53.5 -47.8 -53.1 66 -99 SPO 1997 10 24 00 52 80 3.5 -9 675.70 -53.5 -47.4 -53.2 66 -99 SPO 1997 10 24 00 53 78 3.7 -9 675.70 -53.4 -46.2 -53.1 65 -99 SPO 1997 10 24 00 54 76 3.9 -9 675.70 -53.4 -45.4 -53.1 65 -99 SPO 1997 10 24 00 55 76 4.1 -9 675.60 -53.2 -45.0 -53.1 64 -99 SPO 1997 10 24 00 56 75 4.1 -9 675.60 -53.2 -44.8 -53.0 64 -99 SPO 1997 10 24 00 57 75 4.0 -9 675.60 -53.2 -44.8 -53.0 65 -99 SPO 1997 10 24 00 58 76 3.8 -9 675.60 -53.0 -44.9 -52.9 64 -99 SPO 1997 10 24 00 59 80 3.4 -9 675.60 -53.0 -45.8 -52.8 65 -99 SPO 1997 10 24 01 00 84 3.2 -9 675.60 -53.0 -46.9 -52.6 65 0 SPO 1997 10 24 01 01 87 3.2 -9 675.70 -52.9 -47.4 -52.5 65 -99 SPO 1997 10 24 01 02 88 3.2 -9 675.70 -52.9 -47.6 -52.5 65 -99 SPO 1997 10 24 01 03 86 3.3 -9 675.70 -52.7 -47.7 -52.4 65 -99 SPO 1997 10 24 01 04 84 3.4 -9 675.60 -52.7 -47.8 -52.4 65 -99 SPO 1997 10 24 01 05 83 3.4 -9 675.60 -52.7 -47.8 -52.4 65 -99 SPO 1997 10 24 01 06 82 3.5 -9 675.60 -52.7 -48.0 -52.4 65 -99 SPO 1997 10 24 01 07 82 3.4 -9 675.60 -52.7 -48.2 -52.4 65 -99 SPO 1997 10 24 01 08 82 3.3 -9 675.60 -52.7 -48.3 -52.3 65 -99 SPO 1997 10 24 01 09 83 3.4 -9 675.60 -52.7 -48.3 -52.3 65 -99 SPO 1997 10 24 01 10 83 3.3 -9 675.60 -52.7 -48.4 -52.2 66 -99 SPO 1997 10 24 01 11 83 3.4 -9 675.60 -52.5 -48.3 -52.2 65 -99 SPO 1997 10 24 01 12 84 3.4 -9 675.60 -52.5 -48.3 -52.2 65 -99 SPO 1997 10 24 01 13 86 3.3 -9 675.60 -52.5 -48.1 -52.1 65 -99 SPO 1997 10 24 01 14 89 3.1 -9 675.60 -52.5 -48.0 -52.1 65 -99 SPO 1997 10 24 01 15 93 2.9 -9 675.60 -52.5 -47.9 -52.0 66 -99 SPO 1997 10 24 01 16 98 2.8 -9 675.70 -52.5 -47.8 -52.0 66 -99 SPO 1997 10 24 01 17 100 2.9 -9 675.70 -52.5 -47.8 -52.1 66 -99 SPO 1997 10 24 01 18 101 3.0 -9 675.70 -52.5 -47.7 -52.2 66 -99 SPO 1997 10 24 01 19 101 2.9 -9 675.70 -52.5 -47.6 -52.2 65 -99 SPO 1997 10 24 01 20 101 3.0 -9 675.70 -52.5 -47.5 -52.1 65 -99 SPO 1997 10 24 01 21 101 3.0 -9 675.70 -52.5 -47.4 -52.1 64 -99 SPO 1997 10 24 01 22 101 3.0 -9 675.60 -52.5 -47.2 -52.1 64 -99 SPO 1997 10 24 01 23 101 3.0 -9 675.60 -52.5 -46.8 -52.1 65 -99 SPO 1997 10 24 01 24 99 3.0 -9 675.60 -52.5 -46.4 -52.0 65 -99 SPO 1997 10 24 01 25 100 3.1 -9 675.60 -52.5 -46.0 -52.0 65 -99 SPO 1997 10 24 01 26 101 3.1 -9 675.60 -52.5 -45.8 -52.0 65 -99 SPO 1997 10 24 01 27 107 2.9 -9 675.60 -52.5 -45.8 -52.1 65 -99 SPO 1997 10 24 01 28 112 2.7 -9 675.60 -52.7 -46.2 -52.2 66 -99 SPO 1997 10 24 01 29 113 2.8 -9 675.60 -52.7 -46.4 -52.3 66 -99 SPO 1997 10 24 01 30 113 2.9 -9 675.60 -52.7 -46.6 -52.3 66 -99 SPO 1997 10 24 01 31 115 2.8 -9 675.60 -52.7 -46.5 -52.3 67 -99 SPO 1997 10 24 01 32 117 2.9 -9 675.60 -52.7 -46.6 -52.3 66 -99 SPO 1997 10 24 01 33 118 2.9 -9 675.60 -52.7 -46.7 -52.3 66 -99 SPO 1997 10 24 01 34 117 2.9 -9 675.60 -52.7 -46.8 -52.4 65 -99 SPO 1997 10 24 01 35 120 2.8 -9 675.60 -52.7 -46.9 -52.4 65 -99 SPO 1997 10 24 01 36 125 2.8 -9 675.60 -52.7 -47.4 -52.4 65 -99 SPO 1997 10 24 01 37 124 2.9 -9 675.60 -52.7 -48.0 -52.4 65 -99 SPO 1997 10 24 01 38 121 2.9 -9 675.60 -52.7 -48.2 -52.4 65 -99 SPO 1997 10 24 01 39 116 2.8 -9 675.60 -52.7 -48.2 -52.4 66 -99 SPO 1997 10 24 01 40 115 2.7 -9 675.60 -52.7 -48.2 -52.3 66 -99 SPO 1997 10 24 01 41 113 2.7 -9 675.60 -52.7 -48.1 -52.2 66 -99 SPO 1997 10 24 01 42 112 2.6 -9 675.50 -52.7 -48.0 -52.2 66 -99 SPO 1997 10 24 01 43 113 2.4 -9 675.50 -52.7 -47.8 -52.2 66 -99 SPO 1997 10 24 01 44 119 2.2 -9 675.50 -52.7 -48.0 -52.0 66 -99 SPO 1997 10 24 01 45 133 2.0 -9 675.60 -52.4 -49.2 -51.9 64 -99 SPO 1997 10 24 01 46 141 1.7 -9 675.60 -52.2 -50.3 -51.7 62 -99 SPO 1997 10 24 01 47 129 1.7 -9 675.60 -52.2 -50.7 -51.6 62 -99 SPO 1997 10 24 01 48 120 1.9 -9 675.50 -999.9 -50.5 -51.5 -99 -99 SPO 1997 10 24 01 49 112 2.0 -9 675.50 -999.9 -50.4 -51.4 -99 -99 SPO 1997 10 24 01 50 109 2.1 -9 675.50 -52.2 -50.3 -51.4 65 -99 SPO 1997 10 24 01 51 107 2.2 -9 675.50 -52.2 -49.9 -51.5 65 -99 SPO 1997 10 24 01 52 107 2.2 -9 675.50 -52.2 -49.2 -51.6 65 -99 SPO 1997 10 24 01 53 110 2.3 -9 675.50 -52.2 -48.8 -51.6 65 -99 SPO 1997 10 24 01 54 109 2.3 -9 675.50 -52.2 -48.6 -51.6 65 -99 SPO 1997 10 24 01 55 111 2.3 -9 675.50 -52.2 -48.4 -51.6 65 -99 SPO 1997 10 24 01 56 113 2.3 -9 675.50 -52.2 -48.9 -51.6 65 -99 SPO 1997 10 24 01 57 114 2.3 -9 675.50 -52.4 -49.6 -51.6 67 -99 SPO 1997 10 24 01 58 113 2.4 -9 675.50 -52.4 -49.5 -51.7 67 -99 SPO 1997 10 24 01 59 109 2.5 -9 675.50 -52.4 -48.8 -51.7 67 -99 SPO 1997 10 24 02 00 107 2.6 -9 675.40 -52.4 -48.2 -51.7 67 0 SPO 1997 10 24 02 01 106 2.7 -9 675.40 -52.4 -48.0 -51.7 67 -99 SPO 1997 10 24 02 02 103 2.8 -9 675.40 -52.4 -48.1 -51.6 66 -99 SPO 1997 10 24 02 03 102 2.9 -9 675.40 -999.9 -48.2 -51.6 -99 -99 SPO 1997 10 24 02 04 102 2.9 -9 675.40 -999.9 -48.3 -51.6 -99 -99 SPO 1997 10 24 02 05 107 2.8 -9 675.40 -999.9 -48.6 -51.7 -99 -99 SPO 1997 10 24 02 06 115 2.7 -9 675.40 -999.9 -48.9 -51.8 -99 -99 SPO 1997 10 24 02 07 122 2.8 -9 675.50 -999.9 -49.7 -51.6 -99 -99 SPO 1997 10 24 02 08 120 2.9 -9 675.50 -999.9 -50.1 -51.4 -99 -99 SPO 1997 10 24 02 09 114 3.1 -9 675.40 -999.9 -50.1 -51.6 -99 -99 SPO 1997 10 24 02 10 109 3.3 -9 675.40 -52.2 -50.0 -51.8 67 -99 SPO 1997 10 24 02 11 106 3.3 -9 675.40 -52.4 -49.9 -51.8 68 -99 SPO 1997 10 24 02 12 105 3.3 -9 675.40 -52.4 -50.1 -51.7 67 -99 SPO 1997 10 24 02 13 104 3.3 -9 675.30 -52.4 -49.9 -51.6 67 -99 SPO 1997 10 24 02 14 104 3.3 -9 675.30 -52.4 -49.6 -51.6 67 -99 SPO 1997 10 24 02 15 104 3.3 -9 675.30 -52.4 -49.7 -51.6 66 -99 SPO 1997 10 24 02 16 103 3.4 -9 675.30 -52.4 -50.0 -51.6 65 -99 SPO 1997 10 24 02 17 102 3.4 -9 675.30 -52.4 -50.2 -51.6 66 -99 SPO 1997 10 24 02 18 100 3.4 -9 675.30 -52.4 -50.3 -51.6 67 -99 SPO 1997 10 24 02 19 98 3.4 -9 675.20 -52.2 -50.2 -51.5 65 -99 SPO 1997 10 24 02 20 96 3.4 -9 675.20 -52.2 -50.2 -51.4 66 -99 SPO 1997 10 24 02 21 95 3.4 -9 675.30 -52.2 -50.2 -51.3 66 -99 SPO 1997 10 24 02 22 94 3.5 -9 675.30 -52.2 -50.2 -51.2 66 -99 SPO 1997 10 24 02 23 92 3.6 -9 675.30 -52.2 -50.3 -51.2 66 -99 SPO 1997 10 24 02 24 91 3.6 -9 675.20 -52.2 -50.4 -51.1 66 -99 SPO 1997 10 24 02 25 90 3.7 -9 675.20 -52.2 -50.4 -51.1 67 -99 SPO 1997 10 24 02 26 89 3.7 -9 675.20 -52.2 -50.4 -51.0 67 -99 SPO 1997 10 24 02 27 89 3.6 -9 675.20 -52.2 -50.2 -51.0 67 -99 SPO 1997 10 24 02 28 88 3.7 -9 675.20 -52.2 -49.7 -51.0 67 -99 SPO 1997 10 24 02 29 86 3.9 -9 675.10 -52.2 -48.6 -51.0 66 -99 SPO 1997 10 24 02 30 84 4.1 -9 675.10 -52.2 -47.8 -51.0 66 -99 SPO 1997 10 24 02 31 81 4.2 -9 675.10 -52.2 -47.3 -51.1 66 -99 SPO 1997 10 24 02 32 79 4.3 -9 675.10 -52.2 -47.0 -51.2 66 -99 SPO 1997 10 24 02 33 78 4.5 -9 675.00 -52.2 -46.9 -51.2 66 -99 SPO 1997 10 24 02 34 77 4.5 -9 675.00 -52.0 -46.8 -51.2 66 -99 SPO 1997 10 24 02 35 76 4.6 -9 675.00 -52.0 -46.6 -51.3 66 -99 SPO 1997 10 24 02 36 76 4.7 -9 675.00 -52.0 -46.6 -51.3 66 -99 SPO 1997 10 24 02 37 78 4.6 -9 675.00 -52.0 -46.4 -51.3 66 -99 SPO 1997 10 24 02 38 80 4.4 -9 675.00 -52.0 -46.4 -51.2 66 -99 SPO 1997 10 24 02 39 81 4.3 -9 675.00 -52.0 -46.4 -51.1 66 -99 SPO 1997 10 24 02 40 82 4.4 -9 675.00 -52.0 -46.4 -51.1 66 -99 SPO 1997 10 24 02 41 82 4.3 -9 675.00 -52.0 -46.6 -51.1 66 -99 SPO 1997 10 24 02 42 81 4.3 -9 675.00 -52.0 -47.0 -51.1 66 -99 SPO 1997 10 24 02 43 81 4.3 -9 675.00 -52.0 -47.2 -51.2 65 -99 SPO 1997 10 24 02 44 82 4.1 -9 675.00 -52.2 -47.5 -51.2 66 -99 SPO 1997 10 24 02 45 84 3.9 -9 675.00 -52.2 -47.6 -51.2 65 -99 SPO 1997 10 24 02 46 86 3.7 -9 675.00 -52.2 -47.7 -51.1 65 -99 SPO 1997 10 24 02 47 90 3.5 -9 675.00 -52.2 -48.6 -51.1 65 -99 SPO 1997 10 24 02 48 93 3.4 -9 675.00 -52.2 -49.7 -51.1 65 -99 SPO 1997 10 24 02 49 95 3.4 -9 675.00 -52.4 -50.4 -51.1 67 -99 SPO 1997 10 24 02 50 95 3.5 -9 675.00 -52.4 -50.6 -51.2 66 -99 SPO 1997 10 24 02 51 93 3.6 -9 675.00 -52.5 -50.4 -51.2 67 -99 SPO 1997 10 24 02 52 93 3.7 -9 675.00 -52.5 -49.6 -51.2 66 -99 SPO 1997 10 24 02 53 90 3.8 -9 674.90 -52.5 -48.9 -51.3 66 -99 SPO 1997 10 24 02 54 88 3.8 -9 674.90 -52.5 -48.6 -51.3 66 -99 SPO 1997 10 24 02 55 86 3.9 -9 674.90 -52.7 -48.2 -51.4 67 -99 SPO 1997 10 24 02 56 86 3.9 -9 674.90 -52.7 -48.2 -51.4 66 -99 SPO 1997 10 24 02 57 86 3.8 -9 674.90 -52.7 -48.2 -51.4 66 -99 SPO 1997 10 24 02 58 87 3.8 -9 674.90 -52.7 -48.0 -51.4 66 -99 SPO 1997 10 24 02 59 88 3.7 -9 674.90 -52.7 -48.0 -51.4 66 -99 SPO 1997 10 24 03 00 89 3.6 -9 674.90 -52.7 -47.9 -51.4 66 0 SPO 1997 10 24 03 01 89 3.5 -9 674.90 -52.7 -47.9 -51.4 66 -99 SPO 1997 10 24 03 02 89 3.5 -9 674.90 -52.7 -47.9 -51.3 66 -99 SPO 1997 10 24 03 03 88 3.4 -9 674.90 -52.7 -47.9 -51.3 65 -99 SPO 1997 10 24 03 04 87 3.4 -9 674.80 -52.7 -47.8 -51.3 65 -99 SPO 1997 10 24 03 05 87 3.4 -9 674.80 -52.7 -47.9 -51.3 65 -99 SPO 1997 10 24 03 06 87 3.4 -9 674.80 -52.7 -47.8 -51.4 65 -99 SPO 1997 10 24 03 07 87 3.4 -9 674.80 -52.7 -47.8 -51.4 65 -99 SPO 1997 10 24 03 08 88 3.4 -9 674.80 -52.9 -47.7 -51.4 67 -99 SPO 1997 10 24 03 09 89 3.4 -9 674.80 -52.9 -47.7 -51.4 66 -99 SPO 1997 10 24 03 10 90 3.4 -9 674.80 -53.0 -47.7 -51.5 66 -99 SPO 1997 10 24 03 11 90 3.4 -9 674.70 -53.0 -47.7 -51.5 65 -99 SPO 1997 10 24 03 12 90 3.4 -9 674.70 -53.0 -47.8 -51.6 64 -99 SPO 1997 10 24 03 13 90 3.4 -9 674.80 -53.0 -47.8 -51.6 64 -99 SPO 1997 10 24 03 14 92 3.3 -9 674.80 -53.0 -48.1 -51.6 64 -99 SPO 1997 10 24 03 15 94 3.3 -9 674.70 -53.0 -48.6 -51.6 65 -99 SPO 1997 10 24 03 16 98 3.3 -9 674.70 -53.0 -49.4 -51.7 65 -99 SPO 1997 10 24 03 17 99 3.3 -9 674.70 -53.2 -50.0 -51.8 66 -99 SPO 1997 10 24 03 18 98 3.4 -9 674.70 -53.2 -50.2 -51.9 66 -99 SPO 1997 10 24 03 19 96 3.5 -9 674.70 -53.2 -50.0 -51.9 66 -99 SPO 1997 10 24 03 20 94 3.5 -9 674.70 -53.2 -49.8 -51.8 65 -99 SPO 1997 10 24 03 21 93 3.4 -9 674.70 -53.2 -49.8 -51.8 65 -99 SPO 1997 10 24 03 22 94 3.3 -9 674.70 -53.2 -49.9 -51.8 65 -99 SPO 1997 10 24 03 23 95 3.3 -9 674.70 -53.2 -50.1 -51.8 64 -99 SPO 1997 10 24 03 24 95 3.3 -9 674.70 -53.4 -50.2 -51.9 66 -99 SPO 1997 10 24 03 25 94 3.3 -9 674.70 -53.4 -50.0 -51.9 65 -99 SPO 1997 10 24 03 26 92 3.3 -9 674.70 -53.2 -49.8 -51.8 64 -99 SPO 1997 10 24 03 27 91 3.3 -9 674.70 -53.2 -49.4 -51.8 64 -99 SPO 1997 10 24 03 28 90 3.5 -9 674.70 -53.2 -49.2 -51.8 64 -99 SPO 1997 10 24 03 29 90 3.6 -9 674.60 -53.2 -49.1 -51.8 64 -99 SPO 1997 10 24 03 30 90 3.6 -9 674.60 -53.2 -49.2 -51.8 64 -99 SPO 1997 10 24 03 31 90 3.6 -9 674.60 -53.2 -49.0 -51.9 64 -99 SPO 1997 10 24 03 32 88 3.7 -9 674.50 -53.2 -49.0 -51.9 65 -99 SPO 1997 10 24 03 33 85 3.8 -9 674.50 -53.2 -48.7 -51.9 64 -99 SPO 1997 10 24 03 34 85 3.8 -9 674.50 -53.2 -48.5 -51.8 64 -99 SPO 1997 10 24 03 35 86 3.7 -9 674.50 -53.2 -48.5 -51.8 64 -99 SPO 1997 10 24 03 36 87 3.6 -9 674.40 -53.2 -48.7 -51.8 64 -99 SPO 1997 10 24 03 37 88 3.5 -9 674.40 -53.2 -49.2 -51.8 64 -99 SPO 1997 10 24 03 38 88 3.6 -9 674.40 -53.2 -49.4 -51.8 64 -99 SPO 1997 10 24 03 39 86 3.7 -9 674.40 -53.2 -49.6 -51.9 64 -99 SPO 1997 10 24 03 40 84 3.8 -9 674.40 -53.2 -49.6 -51.8 64 -99 SPO 1997 10 24 03 41 82 3.8 -9 674.40 -53.2 -49.6 -51.8 64 -99 SPO 1997 10 24 03 42 83 3.8 -9 674.40 -53.2 -49.8 -51.7 65 -99 SPO 1997 10 24 03 43 85 3.6 -9 674.40 -53.2 -50.0 -51.7 65 -99 SPO 1997 10 24 03 44 89 3.5 -9 674.40 -53.2 -50.0 -51.8 65 -99 SPO 1997 10 24 03 45 92 3.4 -9 674.50 -53.2 -50.0 -52.0 65 -99 SPO 1997 10 24 03 46 95 3.4 -9 674.50 -53.2 -50.2 -52.2 65 -99 SPO 1997 10 24 03 47 96 3.4 -9 674.50 -53.2 -50.2 -52.4 66 -99 SPO 1997 10 24 03 48 93 3.5 -9 674.40 -53.2 -49.8 -52.3 66 -99 SPO 1997 10 24 03 49 90 3.5 -9 674.40 -53.2 -49.4 -52.1 66 -99 SPO 1997 10 24 03 50 90 3.5 -9 674.40 -53.2 -49.2 -51.9 66 -99 SPO 1997 10 24 03 51 90 3.4 -9 674.40 -53.0 -49.1 -51.8 64 -99 SPO 1997 10 24 03 52 91 3.2 -9 674.50 -53.0 -49.1 -51.8 64 -99 SPO 1997 10 24 03 53 94 3.1 -9 674.50 -53.0 -49.2 -51.9 64 -99 SPO 1997 10 24 03 54 98 2.9 -9 674.50 -53.0 -49.4 -52.1 64 -99 SPO 1997 10 24 03 55 105 2.8 -9 674.50 -53.0 -50.0 -52.2 64 -99 SPO 1997 10 24 03 56 113 2.7 -9 674.60 -53.0 -50.4 -52.2 65 -99 SPO 1997 10 24 03 57 121 2.7 -9 674.60 -52.7 -50.4 -52.0 64 -99 SPO 1997 10 24 03 58 128 2.7 -9 674.60 -52.5 -50.5 -51.9 64 -99 SPO 1997 10 24 03 59 131 2.6 -9 674.50 -52.5 -50.6 -51.8 65 -99 SPO 1997 10 24 04 00 131 2.6 -9 674.50 -52.5 -50.5 -51.9 66 0 SPO 1997 10 24 04 01 133 2.6 -9 674.50 -52.7 -50.2 -52.0 68 -99 SPO 1997 10 24 04 02 126 2.7 -9 674.40 -53.0 -50.0 -52.2 70 -99 SPO 1997 10 24 04 03 122 2.8 -9 674.40 -53.2 -49.8 -52.2 70 -99 SPO 1997 10 24 04 04 115 2.7 -9 674.40 -53.2 -49.6 -52.3 69 -99 SPO 1997 10 24 04 05 114 2.7 -9 674.40 -53.2 -49.4 -52.3 68 -99 SPO 1997 10 24 04 06 123 2.7 -9 674.40 -53.4 -49.4 -52.4 68 -99 SPO 1997 10 24 04 07 125 2.8 -9 674.40 -53.5 -49.6 -52.5 68 -99 SPO 1997 10 24 04 08 127 2.9 -9 674.40 -53.4 -49.8 -52.4 66 -99 SPO 1997 10 24 04 09 127 3.0 -9 674.40 -53.2 -50.0 -52.4 65 -99 SPO 1997 10 24 04 10 119 3.0 -9 674.40 -53.2 -50.0 -52.5 65 -99 SPO 1997 10 24 04 11 116 3.1 -9 674.40 -53.4 -49.7 -52.6 67 -99 SPO 1997 10 24 04 12 113 3.1 -9 674.40 -53.5 -49.5 -52.6 67 -99 SPO 1997 10 24 04 13 113 3.2 -9 674.40 -53.4 -49.5 -52.6 66 -99 SPO 1997 10 24 04 14 113 3.2 -9 674.40 -53.4 -49.8 -52.5 66 -99 SPO 1997 10 24 04 15 111 3.3 -9 674.40 -53.4 -50.0 -52.5 66 -99 SPO 1997 10 24 04 16 107 3.3 -9 674.30 -53.4 -49.9 -52.4 66 -99 SPO 1997 10 24 04 17 104 3.4 -9 674.30 -53.2 -49.6 -52.2 65 -99 SPO 1997 10 24 04 18 100 3.4 -9 674.30 -53.2 -49.4 -52.0 65 -99 SPO 1997 10 24 04 19 98 3.5 -9 674.30 -53.2 -49.2 -51.9 65 -99 SPO 1997 10 24 04 20 99 3.6 -9 674.30 -53.2 -49.0 -51.8 65 -99 SPO 1997 10 24 04 21 98 3.6 -9 674.30 -53.2 -48.9 -51.8 65 -99 SPO 1997 10 24 04 22 98 3.7 -9 674.20 -53.2 -48.8 -51.9 65 -99 SPO 1997 10 24 04 23 98 3.7 -9 674.20 -53.2 -48.8 -52.0 65 -99 SPO 1997 10 24 04 24 98 3.7 -9 674.20 -53.2 -48.8 -52.0 66 -99 SPO 1997 10 24 04 25 97 3.8 -9 674.20 -53.2 -48.9 -52.0 66 -99 SPO 1997 10 24 04 26 96 4.0 -9 674.20 -53.2 -49.0 -52.0 66 -99 SPO 1997 10 24 04 27 95 4.0 -9 674.20 -53.0 -49.2 -51.9 65 -99 SPO 1997 10 24 04 28 93 4.0 -9 674.20 -53.0 -49.1 -51.9 65 -99 SPO 1997 10 24 04 29 93 4.0 -9 674.20 -53.0 -49.0 -51.8 65 -99 SPO 1997 10 24 04 30 93 4.0 -9 674.20 -53.0 -48.8 -51.8 65 -99 SPO 1997 10 24 04 31 92 4.0 -9 674.20 -53.0 -48.9 -51.8 67 -99 SPO 1997 10 24 04 32 93 4.0 -9 674.20 -53.0 -49.1 -51.8 67 -99 SPO 1997 10 24 04 33 93 3.9 -9 674.20 -53.0 -49.3 -51.8 66 -99 SPO 1997 10 24 04 34 92 3.9 -9 674.20 -53.0 -49.5 -51.8 66 -99 SPO 1997 10 24 04 35 91 3.8 -9 674.20 -53.0 -49.5 -51.8 65 -99 SPO 1997 10 24 04 36 90 3.8 -9 674.10 -53.0 -49.5 -51.8 66 -99 SPO 1997 10 24 04 37 90 3.7 -9 674.10 -53.0 -49.5 -51.7 66 -99 SPO 1997 10 24 04 38 91 3.7 -9 674.10 -53.2 -49.6 -51.8 68 -99 SPO 1997 10 24 04 39 90 3.9 -9 674.10 -53.2 -49.8 -51.8 68 -99 SPO 1997 10 24 04 40 88 3.9 -9 674.10 -53.2 -50.0 -51.8 68 -99 SPO 1997 10 24 04 41 87 3.9 -9 674.10 -53.2 -50.0 -51.8 68 -99 SPO 1997 10 24 04 42 88 3.9 -9 674.10 -53.2 -50.1 -51.9 68 -99 SPO 1997 10 24 04 43 86 4.0 -9 674.00 -53.2 -50.1 -51.9 68 -99 SPO 1997 10 24 04 44 84 4.1 -9 674.00 -53.2 -50.0 -51.9 68 -99 SPO 1997 10 24 04 45 83 4.3 -9 674.00 -53.2 -49.8 -52.0 68 -99 SPO 1997 10 24 04 46 82 4.5 -9 674.00 -53.2 -49.6 -52.0 68 -99 SPO 1997 10 24 04 47 80 4.8 -9 673.90 -53.2 -49.4 -52.2 67 -99 SPO 1997 10 24 04 48 78 5.0 -9 673.90 -53.2 -49.0 -52.3 66 -99 SPO 1997 10 24 04 49 76 5.1 -9 673.90 -53.2 -48.4 -52.4 66 -99 SPO 1997 10 24 04 50 75 5.3 -9 673.90 -53.0 -47.6 -52.5 64 -99 SPO 1997 10 24 04 51 75 5.3 -9 673.90 -53.0 -47.0 -52.5 65 -99 SPO 1997 10 24 04 52 74 5.4 -9 673.90 -53.0 -46.9 -52.5 65 -99 SPO 1997 10 24 04 53 74 5.5 -9 673.90 -53.0 -47.3 -52.5 66 -99 SPO 1997 10 24 04 54 75 5.5 -9 673.90 -53.0 -46.8 -52.4 66 -99 SPO 1997 10 24 04 55 74 5.5 -9 673.90 -52.9 -46.3 -52.4 65 -99 SPO 1997 10 24 04 56 74 5.5 -9 673.80 -52.9 -45.8 -52.4 65 -99 SPO 1997 10 24 04 57 73 5.6 -9 673.90 -52.9 -45.4 -52.5 66 -99 SPO 1997 10 24 04 58 73 5.6 -9 673.80 -53.0 -45.2 -52.5 67 -99 SPO 1997 10 24 04 59 72 5.7 -9 673.80 -52.9 -45.4 -52.5 66 -99 SPO 1997 10 24 05 00 72 5.8 -9 673.80 -52.9 -45.4 -52.5 66 0 SPO 1997 10 24 05 01 71 5.8 -9 673.80 -52.9 -45.0 -52.5 66 -99 SPO 1997 10 24 05 02 71 5.9 -9 673.80 -52.9 -44.6 -52.5 65 -99 SPO 1997 10 24 05 03 70 6.0 -9 673.80 -52.7 -44.4 -52.5 64 -99 SPO 1997 10 24 05 04 69 6.0 -9 673.70 -52.7 -44.2 -52.5 64 -99 SPO 1997 10 24 05 05 69 6.0 -9 673.70 -52.9 -44.3 -52.5 65 -99 SPO 1997 10 24 05 06 69 5.8 -9 673.70 -52.7 -44.4 -52.5 65 -99 SPO 1997 10 24 05 07 69 5.8 -9 673.70 -52.7 -44.5 -52.5 65 -99 SPO 1997 10 24 05 08 68 5.7 -9 673.70 -52.7 -44.4 -52.6 65 -99 SPO 1997 10 24 05 09 68 5.7 -9 673.70 -52.7 -44.5 -52.5 65 -99 SPO 1997 10 24 05 10 67 5.6 -9 673.70 -52.9 -44.8 -52.6 65 -99 SPO 1997 10 24 05 11 66 5.7 -9 673.70 -52.9 -45.5 -52.6 66 -99 SPO 1997 10 24 05 12 67 5.8 -9 673.70 -52.9 -46.4 -52.6 65 -99 SPO 1997 10 24 05 13 66 5.9 -9 673.70 -52.9 -46.6 -52.6 66 -99 SPO 1997 10 24 05 14 66 5.8 -9 673.70 -52.9 -46.3 -52.6 65 -99 SPO 1997 10 24 05 15 66 5.8 -9 673.70 -52.9 -46.0 -52.6 65 -99 SPO 1997 10 24 05 16 66 5.6 -9 673.70 -52.9 -45.8 -52.6 65 -99 SPO 1997 10 24 05 17 65 5.3 -9 673.70 -52.9 -46.1 -52.6 65 -99 SPO 1997 10 24 05 18 65 5.2 -9 673.70 -53.0 -46.6 -52.6 65 -99 SPO 1997 10 24 05 19 65 5.1 -9 673.70 -53.0 -47.2 -52.6 65 -99 SPO 1997 10 24 05 20 66 4.9 -9 673.70 -53.0 -47.6 -52.6 65 -99 SPO 1997 10 24 05 21 68 4.9 -9 673.70 -52.9 -48.0 -52.6 65 -99 SPO 1997 10 24 05 22 70 4.5 -9 673.80 -52.9 -48.4 -52.5 64 -99 SPO 1997 10 24 05 23 71 4.3 -9 673.70 -52.9 -48.8 -52.4 64 -99 SPO 1997 10 24 05 24 72 4.3 -9 673.70 -52.9 -48.9 -52.4 65 -99 SPO 1997 10 24 05 25 72 4.2 -9 673.80 -52.9 -49.0 -52.3 65 -99 SPO 1997 10 24 05 26 72 4.2 -9 673.80 -52.9 -49.1 -52.4 65 -99 SPO 1997 10 24 05 27 72 4.3 -9 673.80 -52.9 -49.2 -52.4 65 -99 SPO 1997 10 24 05 28 71 4.3 -9 673.80 -53.0 -49.2 -52.4 65 -99 SPO 1997 10 24 05 29 70 4.4 -9 673.80 -53.0 -49.2 -52.4 64 -99 SPO 1997 10 24 05 30 71 4.4 -9 673.80 -53.0 -49.3 -52.4 64 -99 SPO 1997 10 24 05 31 71 4.3 -9 673.80 -53.0 -49.4 -52.4 64 -99 SPO 1997 10 24 05 32 72 4.3 -9 673.80 -53.0 -49.3 -52.4 64 -99 SPO 1997 10 24 05 33 73 4.2 -9 673.80 -53.0 -49.4 -52.2 64 -99 SPO 1997 10 24 05 34 74 3.9 -9 673.80 -53.0 -49.4 -52.2 64 -99 SPO 1997 10 24 05 35 76 3.8 -9 673.90 -53.0 -49.5 -52.0 64 -99 SPO 1997 10 24 05 36 77 3.7 -9 673.90 -53.0 -49.6 -52.0 65 -99 SPO 1997 10 24 05 37 78 3.7 -9 673.90 -53.0 -49.7 -51.9 65 -99 SPO 1997 10 24 05 38 80 3.7 -9 673.90 -53.0 -49.7 -51.9 64 -99 SPO 1997 10 24 05 39 81 3.7 -9 673.90 -53.0 -49.7 -51.9 64 -99 SPO 1997 10 24 05 40 82 3.7 -9 673.90 -53.0 -49.6 -51.9 64 -99 SPO 1997 10 24 05 41 84 3.7 -9 673.90 -53.0 -49.8 -51.9 65 -99 SPO 1997 10 24 05 42 85 3.7 -9 673.90 -53.2 -49.9 -51.9 66 -99 SPO 1997 10 24 05 43 86 3.6 -9 673.90 -53.2 -50.0 -52.0 65 -99 SPO 1997 10 24 05 44 87 3.5 -9 673.90 -53.2 -50.0 -52.0 65 -99 SPO 1997 10 24 05 45 87 3.5 -9 673.90 -53.2 -50.1 -52.0 65 -99 SPO 1997 10 24 05 46 88 3.5 -9 673.90 -53.4 -50.1 -52.1 67 -99 SPO 1997 10 24 05 47 88 3.5 -9 674.00 -53.4 -50.2 -52.1 67 -99 SPO 1997 10 24 05 48 88 3.4 -9 673.90 -53.4 -50.2 -52.2 67 -99 SPO 1997 10 24 05 49 88 3.4 -9 673.90 -53.5 -50.2 -52.3 67 -99 SPO 1997 10 24 05 50 87 3.5 -9 673.90 -53.5 -50.1 -52.4 66 -99 SPO 1997 10 24 05 51 87 3.6 -9 673.90 -53.7 -50.1 -52.4 67 -99 SPO 1997 10 24 05 52 87 3.6 -9 673.90 -53.7 -50.1 -52.4 67 -99 SPO 1997 10 24 05 53 88 3.6 -9 673.90 -53.7 -50.2 -52.4 66 -99 SPO 1997 10 24 05 54 88 3.6 -9 673.90 -53.7 -50.2 -52.5 66 -99 SPO 1997 10 24 05 55 88 3.6 -9 673.90 -53.7 -50.1 -52.5 66 -99 SPO 1997 10 24 05 56 87 3.8 -9 673.90 -53.7 -49.9 -52.5 66 -99 SPO 1997 10 24 05 57 86 3.8 -9 673.90 -53.5 -49.8 -52.4 64 -99 SPO 1997 10 24 05 58 86 4.0 -9 673.90 -53.5 -49.7 -52.2 64 -99 SPO 1997 10 24 05 59 85 4.1 -9 673.90 -53.5 -49.6 -52.2 64 -99 SPO 1997 10 24 06 00 85 4.2 -9 673.90 -53.5 -49.5 -52.1 64 0 SPO 1997 10 24 06 01 85 4.2 -9 673.90 -53.5 -49.4 -52.1 64 -99 SPO 1997 10 24 06 02 85 4.2 -9 673.90 -53.5 -49.4 -52.0 64 -99 SPO 1997 10 24 06 03 85 4.3 -9 673.80 -53.5 -49.4 -52.0 65 -99 SPO 1997 10 24 06 04 85 4.2 -9 673.80 -53.5 -49.4 -52.0 65 -99 SPO 1997 10 24 06 05 85 4.3 -9 673.80 -53.5 -49.4 -52.0 65 -99 SPO 1997 10 24 06 06 85 4.3 -9 673.80 -53.5 -49.2 -51.9 65 -99 SPO 1997 10 24 06 07 85 4.2 -9 673.80 -53.4 -49.1 -51.9 65 -99 SPO 1997 10 24 06 08 86 4.2 -9 673.80 -53.4 -49.1 -51.8 65 -99 SPO 1997 10 24 06 09 87 4.1 -9 673.80 -53.2 -49.1 -51.8 64 -99 SPO 1997 10 24 06 10 88 4.0 -9 673.80 -53.2 -49.0 -51.7 65 -99 SPO 1997 10 24 06 11 92 3.8 -9 673.90 -53.2 -49.0 -51.8 65 -99 SPO 1997 10 24 06 12 98 3.4 -9 673.90 -53.2 -49.3 -52.1 65 -99 SPO 1997 10 24 06 13 109 2.8 -9 673.90 -53.2 -49.6 -52.2 65 -99 SPO 1997 10 24 06 14 120 2.5 -9 673.90 -53.0 -50.0 -52.1 64 -99 SPO 1997 10 24 06 15 111 2.8 -9 673.90 -53.0 -50.3 -52.0 64 -99 SPO 1997 10 24 06 16 100 3.4 -9 673.80 -53.0 -50.3 -52.1 64 -99 SPO 1997 10 24 06 17 92 3.8 -9 673.80 -53.2 -50.2 -52.0 66 -99 SPO 1997 10 24 06 18 87 4.1 -9 673.80 -53.2 -49.9 -51.8 67 -99 SPO 1997 10 24 06 19 84 4.4 -9 673.70 -53.2 -49.6 -51.7 67 -99 SPO 1997 10 24 06 20 81 4.6 -9 673.70 -53.2 -49.4 -51.7 67 -99 SPO 1997 10 24 06 21 80 4.7 -9 673.70 -53.2 -49.2 -51.7 67 -99 SPO 1997 10 24 06 22 79 4.8 -9 673.70 -53.0 -49.0 -51.8 66 -99 SPO 1997 10 24 06 23 78 4.9 -9 673.70 -53.0 -48.8 -51.9 66 -99 SPO 1997 10 24 06 24 77 5.0 -9 673.70 -53.0 -48.6 -51.9 67 -99 SPO 1997 10 24 06 25 76 5.1 -9 673.70 -52.7 -48.6 -51.9 66 -99 SPO 1997 10 24 06 26 75 5.2 -9 673.70 -52.7 -48.4 -51.9 66 -99 SPO 1997 10 24 06 27 75 5.2 -9 673.70 -52.7 -48.3 -51.9 66 -99 SPO 1997 10 24 06 28 75 5.2 -9 673.70 -52.7 -48.2 -51.8 66 -99 SPO 1997 10 24 06 29 74 5.2 -9 673.70 -52.7 -48.1 -51.8 66 -99 SPO 1997 10 24 06 30 75 5.2 -9 673.70 -52.5 -48.1 -51.8 65 -99 SPO 1997 10 24 06 31 76 5.2 -9 673.70 -52.5 -48.1 -51.8 65 -99 SPO 1997 10 24 06 32 76 5.1 -9 673.70 -52.5 -48.0 -51.8 66 -99 SPO 1997 10 24 06 33 77 5.0 -9 673.70 -52.5 -48.0 -51.6 65 -99 SPO 1997 10 24 06 34 78 4.8 -9 673.70 -52.5 -48.0 -51.6 65 -99 SPO 1997 10 24 06 35 80 4.8 -9 673.70 -52.5 -48.1 -51.5 66 -99 SPO 1997 10 24 06 36 80 4.9 -9 673.70 -52.5 -48.1 -51.5 66 -99 SPO 1997 10 24 06 37 80 5.0 -9 673.70 -52.5 -48.1 -51.5 67 -99 SPO 1997 10 24 06 38 80 5.0 -9 673.70 -52.5 -48.1 -51.5 67 -99 SPO 1997 10 24 06 39 82 5.1 -9 673.70 -52.7 -48.1 -51.5 69 -99 SPO 1997 10 24 06 40 84 5.0 -9 673.70 -52.7 -48.2 -51.4 68 -99 SPO 1997 10 24 06 41 84 4.9 -9 673.70 -52.7 -48.2 -51.4 68 -99 SPO 1997 10 24 06 42 85 4.8 -9 673.80 -52.7 -48.3 -51.3 68 -99 SPO 1997 10 24 06 43 86 4.8 -9 673.80 -52.7 -48.3 -51.3 67 -99 SPO 1997 10 24 06 44 86 4.7 -9 673.80 -52.7 -48.3 -51.3 66 -99 SPO 1997 10 24 06 45 87 4.7 -9 673.80 -52.7 -48.3 -51.2 65 -99 SPO 1997 10 24 06 46 87 4.7 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 47 86 4.8 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 48 86 4.8 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 49 84 4.9 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 50 83 4.9 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 51 84 4.8 -9 673.80 -52.7 -48.3 -51.2 66 -99 SPO 1997 10 24 06 52 84 4.8 -9 673.80 -52.7 -48.4 -51.1 66 -99 SPO 1997 10 24 06 53 84 4.6 -9 673.80 -52.7 -48.4 -51.0 66 -99 SPO 1997 10 24 06 54 86 4.4 -9 673.80 -52.7 -48.5 -51.0 67 -99 SPO 1997 10 24 06 55 89 4.1 -9 673.80 -52.7 -48.7 -50.9 67 -99 SPO 1997 10 24 06 56 91 3.8 -9 673.80 -52.7 -49.0 -51.0 67 -99 SPO 1997 10 24 06 57 94 3.6 -9 673.80 -52.7 -49.2 -51.4 66 -99 SPO 1997 10 24 06 58 96 3.5 -9 673.80 -52.7 -49.4 -51.6 66 -99 SPO 1997 10 24 06 59 97 3.3 -9 673.90 -52.9 -49.6 -51.8 67 -99 SPO 1997 10 24 07 00 98 3.2 -9 673.80 -53.0 -49.7 -51.9 67 0 SPO 1997 10 24 07 01 96 3.6 -9 673.80 -53.0 -49.7 -51.9 67 -99 SPO 1997 10 24 07 02 93 3.8 -9 673.80 -53.0 -49.6 -51.7 67 -99 SPO 1997 10 24 07 03 94 3.7 -9 673.80 -53.0 -49.5 -51.5 67 -99 SPO 1997 10 24 07 04 104 2.8 -9 673.90 -53.0 -49.6 -51.6 68 -99 SPO 1997 10 24 07 05 141 1.7 -9 673.90 -52.9 -50.0 -51.6 67 -99 SPO 1997 10 24 07 06 134 1.8 -9 673.90 -53.2 -50.6 -51.9 68 -99 SPO 1997 10 24 07 07 101 2.9 -9 673.80 -53.0 -50.4 -51.7 66 -99 SPO 1997 10 24 07 08 91 3.6 -9 673.80 -52.9 -49.7 -51.3 66 -99 SPO 1997 10 24 07 09 87 4.0 -9 673.80 -52.7 -49.3 -51.0 65 -99 SPO 1997 10 24 07 10 85 4.2 -9 673.80 -53.0 -49.1 -50.9 68 -99 SPO 1997 10 24 07 11 84 4.2 -9 673.80 -53.0 -49.1 -50.9 68 -99 SPO 1997 10 24 07 12 82 4.4 -9 673.70 -53.0 -49.1 -50.9 68 -99 SPO 1997 10 24 07 13 81 4.3 -9 673.70 -53.0 -49.1 -50.9 67 -99 SPO 1997 10 24 07 14 81 4.4 -9 673.70 -52.7 -49.0 -50.8 65 -99 SPO 1997 10 24 07 15 81 4.5 -9 673.70 -52.7 -49.0 -50.8 65 -99 SPO 1997 10 24 07 16 81 4.7 -9 673.70 -52.7 -49.0 -50.8 65 -99 SPO 1997 10 24 07 17 80 4.7 -9 673.70 -52.9 -49.0 -50.9 68 -99 SPO 1997 10 24 07 18 81 4.8 -9 673.70 -52.9 -49.0 -51.0 69 -99 SPO 1997 10 24 07 19 80 4.9 -9 673.70 -53.0 -49.0 -51.0 69 -99 SPO 1997 10 24 07 20 79 4.9 -9 673.70 -53.0 -48.8 -51.0 69 -99 SPO 1997 10 24 07 21 78 5.0 -9 673.70 -52.9 -48.6 -51.0 68 -99 SPO 1997 10 24 07 22 77 4.9 -9 673.70 -52.9 -48.6 -51.0 68 -99 SPO 1997 10 24 07 23 78 4.7 -9 673.70 -52.9 -48.5 -51.0 68 -99 SPO 1997 10 24 07 24 80 4.5 -9 673.70 -52.7 -48.6 -50.8 66 -99 SPO 1997 10 24 07 25 81 4.2 -9 673.70 -52.7 -48.9 -50.7 67 -99 SPO 1997 10 24 07 26 86 3.6 -9 673.70 -52.7 -49.2 -50.6 67 -99 SPO 1997 10 24 07 27 92 3.2 -9 673.70 -52.7 -49.5 -50.8 67 -99 SPO 1997 10 24 07 28 95 3.1 -9 673.70 -52.7 -49.8 -51.2 67 -99 SPO 1997 10 24 07 29 97 3.1 -9 673.70 -52.7 -50.0 -51.4 67 -99 SPO 1997 10 24 07 30 97 3.2 -9 673.70 -52.5 -50.0 -51.5 65 -99 SPO 1997 10 24 07 31 95 3.4 -9 673.70 -52.5 -50.0 -51.5 65 -99 SPO 1997 10 24 07 32 94 3.5 -9 673.70 -52.5 -50.0 -51.3 66 -99 SPO 1997 10 24 07 33 97 3.5 -9 673.70 -52.5 -50.1 -51.3 67 -99 SPO 1997 10 24 07 34 98 3.6 -9 673.70 -52.5 -50.2 -51.4 68 -99 SPO 1997 10 24 07 35 99 3.7 -9 673.70 -52.5 -50.3 -51.4 69 -99 SPO 1997 10 24 07 36 100 3.7 -9 673.70 -52.5 -50.3 -51.4 69 -99 SPO 1997 10 24 07 37 99 3.8 -9 673.70 -52.4 -50.4 -51.4 69 -99 SPO 1997 10 24 07 38 104 3.5 -9 673.70 -52.4 -50.4 -51.4 69 -99 SPO 1997 10 24 07 39 113 3.2 -9 673.80 -52.4 -50.5 -51.3 69 -99 SPO 1997 10 24 07 40 118 3.1 -9 673.80 -52.2 -50.6 -51.2 69 -99 SPO 1997 10 24 07 41 120 3.1 -9 673.80 -52.2 -50.7 -51.2 69 -99 SPO 1997 10 24 07 42 123 3.1 -9 673.80 -52.0 -50.8 -50.9 67 -99 SPO 1997 10 24 07 43 127 3.0 -9 673.80 -51.7 -50.9 -50.8 66 -99 SPO 1997 10 24 07 44 122 3.1 -9 673.80 -51.7 -50.9 -50.7 66 -99 SPO 1997 10 24 07 45 115 3.1 -9 673.80 -51.7 -50.8 -50.8 66 -99 SPO 1997 10 24 07 46 114 3.2 -9 673.80 -51.9 -50.8 -50.9 68 -99 SPO 1997 10 24 07 47 121 3.0 -9 673.90 -51.9 -50.8 -50.9 69 -99 SPO 1997 10 24 07 48 129 3.1 -9 673.90 -51.7 -50.8 -50.8 67 -99 SPO 1997 10 24 07 49 137 3.1 -9 673.90 -51.5 -50.9 -50.5 67 -99 SPO 1997 10 24 07 50 137 2.7 -9 673.90 -51.4 -50.9 -50.3 67 -99 SPO 1997 10 24 07 51 131 3.0 -9 673.90 -51.4 -50.9 -50.2 67 -99 SPO 1997 10 24 07 52 124 3.1 -9 673.90 -51.4 -50.9 -50.4 68 -99 SPO 1997 10 24 07 53 125 3.1 -9 673.90 -51.7 -50.9 -50.6 71 -99 SPO 1997 10 24 07 54 134 3.1 -9 673.90 -51.5 -50.9 -50.5 70 -99 SPO 1997 10 24 07 55 138 2.9 -9 673.90 -51.4 -50.9 -50.2 69 -99 SPO 1997 10 24 07 56 135 3.1 -9 673.90 -51.4 -51.0 -50.1 70 -99 SPO 1997 10 24 07 57 127 3.4 -9 673.90 -51.5 -51.0 -50.2 70 -99 SPO 1997 10 24 07 58 121 3.6 -9 673.90 -51.7 -50.9 -50.6 72 -99 SPO 1997 10 24 07 59 116 3.7 -9 673.80 -52.0 -50.8 -50.8 74 -99 SPO 1997 10 24 08 00 115 3.7 -9 673.80 -52.0 -50.8 -50.9 73 0 SPO 1997 10 24 08 01 119 3.7 -9 673.80 -52.0 -50.8 -51.0 71 -99 SPO 1997 10 24 08 02 124 3.7 -9 673.90 -52.0 -50.8 -50.9 71 -99 SPO 1997 10 24 08 03 127 3.6 -9 673.80 -52.0 -50.8 -50.9 71 -99 SPO 1997 10 24 08 04 124 3.9 -9 673.80 -52.0 -50.7 -51.0 70 -99 SPO 1997 10 24 08 05 119 4.1 -9 673.80 -52.0 -50.6 -51.1 69 -99 SPO 1997 10 24 08 06 118 4.2 -9 673.80 -52.0 -50.6 -51.2 69 -99 SPO 1997 10 24 08 07 117 4.1 -9 673.80 -52.0 -50.6 -51.2 69 -99 SPO 1997 10 24 08 08 114 4.2 -9 673.80 -51.9 -50.5 -51.1 69 -99 SPO 1997 10 24 08 09 115 4.2 -9 673.80 -51.9 -50.5 -51.1 68 -99 SPO 1997 10 24 08 10 116 4.1 -9 673.80 -51.7 -50.4 -51.0 67 -99 SPO 1997 10 24 08 11 116 4.1 -9 673.80 -51.7 -50.4 -51.0 67 -99 SPO 1997 10 24 08 12 113 4.0 -9 673.80 -51.9 -50.5 -51.1 69 -99 SPO 1997 10 24 08 13 109 4.0 -9 673.80 -52.0 -50.5 -51.1 69 -99 SPO 1997 10 24 08 14 103 4.1 -9 673.70 -51.7 -50.4 -50.8 66 -99 SPO 1997 10 24 08 15 108 3.9 -9 673.80 -51.7 -50.3 -50.6 66 -99 SPO 1997 10 24 08 16 124 3.7 -9 673.80 -51.5 -50.4 -50.7 65 -99 SPO 1997 10 24 08 17 125 4.2 -9 673.70 -51.7 -50.6 -50.8 67 -99 SPO 1997 10 24 08 18 113 4.3 -9 673.70 -51.7 -50.4 -50.9 69 -99 SPO 1997 10 24 08 19 103 4.5 -9 673.70 -51.5 -50.0 -50.6 68 -99 SPO 1997 10 24 08 20 116 4.4 -9 673.70 -51.5 -49.9 -50.5 68 -99 SPO 1997 10 24 08 21 111 4.4 -9 673.70 -51.7 -50.1 -50.8 70 -99 SPO 1997 10 24 08 22 109 4.4 -9 673.70 -51.7 -50.0 -50.7 70 -99 SPO 1997 10 24 08 23 120 3.9 -9 673.80 -51.7 -50.0 -50.8 70 -99 SPO 1997 10 24 08 24 130 3.9 -9 673.80 -51.7 -50.3 -50.9 70 -99 SPO 1997 10 24 08 25 124 4.0 -9 673.80 -51.7 -50.5 -51.0 69 -99 SPO 1997 10 24 08 26 109 4.2 -9 673.70 -51.7 -50.2 -51.0 67 -99 SPO 1997 10 24 08 27 118 4.0 -9 673.80 -51.7 -50.1 -50.9 66 -99 SPO 1997 10 24 08 28 128 3.8 -9 673.80 -51.9 -50.2 -51.1 68 -99 SPO 1997 10 24 08 29 124 4.3 -9 673.70 -52.0 -50.4 -51.2 69 -99 SPO 1997 10 24 08 30 116 4.4 -9 673.80 -52.0 -50.2 -51.2 68 -99 SPO 1997 10 24 08 31 126 4.3 -9 673.80 -51.9 -50.1 -51.2 67 -99 SPO 1997 10 24 08 32 131 4.3 -9 673.80 -52.0 -50.3 -51.2 68 -99 SPO 1997 10 24 08 33 126 4.6 -9 673.80 -52.0 -50.4 -51.3 68 -99 SPO 1997 10 24 08 34 122 4.5 -9 673.80 -52.0 -50.2 -51.3 68 -99 SPO 1997 10 24 08 35 124 4.4 -9 673.80 -52.0 -50.2 -51.3 68 -99 SPO 1997 10 24 08 36 121 4.5 -9 673.80 -52.0 -50.2 -51.3 67 -99 SPO 1997 10 24 08 37 124 4.4 -9 673.80 -52.0 -50.2 -51.3 67 -99 SPO 1997 10 24 08 38 130 4.4 -9 673.80 -51.9 -50.2 -51.2 66 -99 SPO 1997 10 24 08 39 131 4.5 -9 673.80 -51.9 -50.2 -51.1 67 -99 SPO 1997 10 24 08 40 127 4.8 -9 673.80 -51.7 -50.1 -51.1 66 -99 SPO 1997 10 24 08 41 123 5.0 -9 673.80 -51.7 -50.0 -51.2 66 -99 SPO 1997 10 24 08 42 120 5.1 -9 673.80 -51.7 -49.9 -51.1 66 -99 SPO 1997 10 24 08 43 119 5.1 -9 673.80 -51.7 -49.8 -51.0 66 -99 SPO 1997 10 24 08 44 123 4.9 -9 673.80 -51.7 -49.8 -51.0 66 -99 SPO 1997 10 24 08 45 126 4.7 -9 673.80 -51.7 -49.8 -51.0 66 -99 SPO 1997 10 24 08 46 128 4.7 -9 673.80 -51.7 -49.8 -51.0 67 -99 SPO 1997 10 24 08 47 128 4.6 -9 673.80 -51.7 -49.8 -51.0 69 -99 SPO 1997 10 24 08 48 125 4.7 -9 673.80 -51.7 -49.8 -51.1 69 -99 SPO 1997 10 24 08 49 120 5.0 -9 673.80 -51.7 -49.7 -51.0 69 -99 SPO 1997 10 24 08 50 115 5.1 -9 673.80 -51.5 -49.5 -51.0 67 -99 SPO 1997 10 24 08 51 113 5.1 -9 673.70 -51.5 -49.4 -50.8 67 -99 SPO 1997 10 24 08 52 113 5.1 -9 673.70 -51.5 -49.4 -50.7 68 -99 SPO 1997 10 24 08 53 112 5.1 -9 673.70 -51.4 -49.4 -50.6 68 -99 SPO 1997 10 24 08 54 111 5.0 -9 673.70 -51.4 -49.4 -50.5 68 -99 SPO 1997 10 24 08 55 108 5.0 -9 673.70 -51.4 -49.4 -50.4 68 -99 SPO 1997 10 24 08 56 107 4.9 -9 673.70 -51.4 -49.4 -50.3 68 -99 SPO 1997 10 24 08 57 105 5.0 -9 673.70 -51.2 -49.4 -50.2 66 -99 SPO 1997 10 24 08 58 103 5.1 -9 673.70 -51.2 -49.4 -50.1 68 -99 SPO 1997 10 24 08 59 100 5.2 -9 673.70 -51.2 -49.4 -50.0 68 -99 SPO 1997 10 24 09 00 99 5.3 -9 673.70 -51.2 -49.4 -50.0 68 0 SPO 1997 10 24 09 01 100 5.4 -9 673.70 -51.2 -49.5 -50.0 69 -99 SPO 1997 10 24 09 02 99 5.4 -9 673.60 -51.2 -49.4 -50.0 70 -99 SPO 1997 10 24 09 03 98 5.5 -9 673.60 -51.2 -49.4 -49.9 70 -99 SPO 1997 10 24 09 04 98 5.6 -9 673.60 -51.2 -49.5 -50.0 71 -99 SPO 1997 10 24 09 05 97 5.5 -9 673.60 -51.2 -49.5 -49.9 71 -99 SPO 1997 10 24 09 06 97 5.5 -9 673.60 -51.2 -49.5 -50.0 71 -99 SPO 1997 10 24 09 07 96 5.4 -9 673.60 -51.2 -49.6 -50.0 71 -99 SPO 1997 10 24 09 08 95 5.4 -9 673.60 -51.0 -49.6 -50.0 68 -99 SPO 1997 10 24 09 09 93 5.3 -9 673.60 -51.0 -49.6 -50.0 67 -99 SPO 1997 10 24 09 10 92 5.3 -9 673.60 -51.2 -49.6 -50.0 69 -99 SPO 1997 10 24 09 11 91 5.3 -9 673.60 -51.0 -49.6 -50.0 67 -99 SPO 1997 10 24 09 12 90 5.3 -9 673.60 -51.2 -49.5 -50.0 68 -99 SPO 1997 10 24 09 13 90 5.3 -9 673.60 -51.2 -49.6 -50.0 69 -99 SPO 1997 10 24 09 14 90 5.3 -9 673.60 -51.2 -49.6 -50.0 71 -99 SPO 1997 10 24 09 15 90 5.3 -9 673.60 -51.2 -49.6 -50.0 70 -99 SPO 1997 10 24 09 16 90 5.2 -9 673.60 -51.2 -49.7 -50.0 70 -99 SPO 1997 10 24 09 17 90 5.2 -9 673.60 -51.2 -49.7 -50.0 70 -99 SPO 1997 10 24 09 18 90 5.1 -9 673.60 -51.2 -49.7 -50.1 69 -99 SPO 1997 10 24 09 19 92 5.0 -9 673.60 -51.2 -49.8 -50.1 69 -99 SPO 1997 10 24 09 20 91 5.1 -9 673.60 -51.4 -49.8 -50.1 70 -99 SPO 1997 10 24 09 21 89 5.0 -9 673.50 -51.4 -49.9 -50.1 70 -99 SPO 1997 10 24 09 22 88 5.2 -9 673.50 -51.4 -49.9 -50.2 69 -99 SPO 1997 10 24 09 23 86 5.3 -9 673.50 -51.5 -49.8 -50.2 69 -99 SPO 1997 10 24 09 24 85 5.5 -9 673.50 -51.5 -49.6 -50.2 69 -99 SPO 1997 10 24 09 25 85 5.6 -9 673.50 -51.4 -49.5 -50.3 68 -99 SPO 1997 10 24 09 26 85 5.6 -9 673.50 -51.4 -49.6 -50.3 68 -99 SPO 1997 10 24 09 27 84 5.5 -9 673.50 -51.5 -49.7 -50.4 69 -99 SPO 1997 10 24 09 28 83 5.5 -9 673.50 -51.5 -49.7 -50.4 69 -99 SPO 1997 10 24 09 29 83 5.5 -9 673.40 -51.5 -49.7 -50.4 69 -99 SPO 1997 10 24 09 30 82 5.5 -9 673.40 -51.5 -49.8 -50.4 69 -99 SPO 1997 10 24 09 31 80 5.6 -9 673.40 -51.5 -49.8 -50.5 68 -99 SPO 1997 10 24 09 32 79 5.7 -9 673.40 -51.5 -49.7 -50.6 68 -99 SPO 1997 10 24 09 33 77 5.8 -9 673.40 -51.5 -49.6 -50.7 68 -99 SPO 1997 10 24 09 34 76 5.7 -9 673.40 -51.5 -49.5 -50.8 67 -99 SPO 1997 10 24 09 35 76 5.6 -9 673.40 -51.5 -49.4 -50.8 67 -99 SPO 1997 10 24 09 36 75 5.7 -9 673.40 -51.7 -49.4 -50.9 66 -99 SPO 1997 10 24 09 37 76 5.6 -9 673.40 -51.7 -49.3 -50.9 66 -99 SPO 1997 10 24 09 38 76 5.5 -9 673.40 -51.7 -49.3 -50.9 66 -99 SPO 1997 10 24 09 39 76 5.4 -9 673.30 -51.7 -49.3 -50.9 66 -99 SPO 1997 10 24 09 40 75 5.6 -9 673.40 -51.7 -49.4 -51.0 66 -99 SPO 1997 10 24 09 41 75 5.5 -9 673.30 -51.7 -49.3 -51.0 67 -99 SPO 1997 10 24 09 42 74 5.6 -9 673.30 -51.7 -49.2 -51.0 66 -99 SPO 1997 10 24 09 43 74 5.7 -9 673.30 -51.7 -49.2 -51.1 66 -99 SPO 1997 10 24 09 44 74 5.6 -9 673.30 -51.7 -49.2 -51.1 66 -99 SPO 1997 10 24 09 45 73 5.7 -9 673.30 -51.7 -49.3 -51.0 66 -99 SPO 1997 10 24 09 46 72 5.8 -9 673.30 -51.7 -49.3 -51.1 66 -99 SPO 1997 10 24 09 47 71 5.8 -9 673.30 -51.7 -49.3 -51.1 66 -99 SPO 1997 10 24 09 48 71 5.8 -9 673.30 -51.7 -49.3 -51.1 66 -99 SPO 1997 10 24 09 49 71 5.8 -9 673.30 -51.7 -49.2 -51.1 66 -99 SPO 1997 10 24 09 50 70 6.0 -9 673.20 -51.7 -49.2 -51.1 66 -99 SPO 1997 10 24 09 51 69 6.0 -9 673.20 -51.7 -49.2 -51.2 66 -99 SPO 1997 10 24 09 52 68 6.1 -9 673.20 -51.7 -49.2 -51.2 66 -99 SPO 1997 10 24 09 53 68 6.2 -9 673.20 -51.7 -49.1 -51.2 66 -99 SPO 1997 10 24 09 54 68 6.3 -9 673.20 -51.7 -49.1 -51.2 66 -99 SPO 1997 10 24 09 55 67 6.3 -9 673.10 -51.7 -49.1 -51.3 66 -99 SPO 1997 10 24 09 56 67 6.5 -9 673.10 -51.7 -49.1 -51.3 66 -99 SPO 1997 10 24 09 57 66 6.5 -9 673.10 -51.7 -49.1 -51.3 66 -99 SPO 1997 10 24 09 58 66 6.4 -9 673.10 -51.7 -49.0 -51.3 66 -99 SPO 1997 10 24 09 59 66 6.5 -9 673.10 -51.7 -48.9 -51.2 66 -99 SPO 1997 10 24 10 00 66 6.4 -9 673.10 -51.7 -48.8 -51.2 66 0 SPO 1997 10 24 10 01 66 6.0 -9 673.20 -51.7 -48.9 -51.2 66 -99 SPO 1997 10 24 10 02 66 6.0 -9 673.10 -51.7 -48.9 -51.2 65 -99 SPO 1997 10 24 10 03 66 6.0 -9 673.10 -51.7 -48.9 -51.2 65 -99 SPO 1997 10 24 10 04 66 6.0 -9 673.10 -51.7 -48.9 -51.3 65 -99 SPO 1997 10 24 10 05 66 6.0 -9 673.10 -51.7 -48.9 -51.3 65 -99 SPO 1997 10 24 10 06 67 6.1 -9 673.10 -51.7 -48.9 -51.3 65 -99 SPO 1997 10 24 10 07 66 6.2 -9 673.10 -51.7 -48.8 -51.3 65 -99 SPO 1997 10 24 10 08 67 6.2 -9 673.10 -51.7 -48.8 -51.4 66 -99 SPO 1997 10 24 10 09 67 6.3 -9 673.10 -51.9 -48.7 -51.4 66 -99 SPO 1997 10 24 10 10 67 6.3 -9 673.10 -51.9 -48.5 -51.4 66 -99 SPO 1997 10 24 10 11 67 6.2 -9 673.10 -51.9 -48.4 -51.4 66 -99 SPO 1997 10 24 10 12 66 6.2 -9 673.10 -52.0 -48.5 -51.4 66 -99 SPO 1997 10 24 10 13 66 6.3 -9 673.00 -52.0 -48.6 -51.5 66 -99 SPO 1997 10 24 10 14 66 6.3 -9 673.00 -52.0 -48.7 -51.5 66 -99 SPO 1997 10 24 10 15 66 6.2 -9 673.00 -52.0 -48.7 -51.5 66 -99 SPO 1997 10 24 10 16 66 6.3 -9 673.00 -52.0 -48.6 -51.6 65 -99 SPO 1997 10 24 10 17 67 6.3 -9 673.00 -52.0 -48.6 -51.6 64 -99 SPO 1997 10 24 10 18 66 6.4 -9 673.00 -52.2 -48.5 -51.6 65 -99 SPO 1997 10 24 10 19 66 6.4 -9 672.90 -52.2 -48.5 -51.7 65 -99 SPO 1997 10 24 10 20 66 6.5 -9 672.90 -52.2 -48.4 -51.7 65 -99 SPO 1997 10 24 10 21 66 6.5 -9 672.90 -52.2 -48.3 -51.7 65 -99 SPO 1997 10 24 10 22 66 6.3 -9 672.90 -52.2 -48.2 -51.7 65 -99 SPO 1997 10 24 10 23 66 6.4 -9 672.90 -52.2 -48.3 -51.7 65 -99 SPO 1997 10 24 10 24 67 6.4 -9 672.90 -52.2 -48.4 -51.7 65 -99 SPO 1997 10 24 10 25 67 6.4 -9 672.90 -52.2 -48.3 -51.7 65 -99 SPO 1997 10 24 10 26 67 6.5 -9 672.90 -52.2 -48.3 -51.8 65 -99 SPO 1997 10 24 10 27 67 6.5 -9 672.90 -52.2 -48.3 -51.8 65 -99 SPO 1997 10 24 10 28 67 6.4 -9 672.90 -52.2 -48.3 -51.7 65 -99 SPO 1997 10 24 10 29 67 6.4 -9 672.90 -52.2 -48.3 -51.7 64 -99 SPO 1997 10 24 10 30 67 6.4 -9 672.90 -52.2 -48.3 -51.8 63 -99 SPO 1997 10 24 10 31 68 6.3 -9 672.90 -52.2 -48.3 -51.8 63 -99 SPO 1997 10 24 10 32 68 6.2 -9 672.90 -52.2 -48.4 -51.8 63 -99 SPO 1997 10 24 10 33 68 6.5 -9 672.90 -52.2 -48.5 -51.8 64 -99 SPO 1997 10 24 10 34 68 6.4 -9 672.90 -52.2 -48.4 -51.8 64 -99 SPO 1997 10 24 10 35 68 6.4 -9 672.90 -52.2 -48.4 -51.8 64 -99 SPO 1997 10 24 10 36 68 6.6 -9 672.90 -52.2 -48.4 -51.8 65 -99 SPO 1997 10 24 10 37 68 6.7 -9 672.90 -52.2 -48.3 -51.8 64 -99 SPO 1997 10 24 10 38 69 6.8 -9 672.90 -52.2 -48.3 -51.9 64 -99 SPO 1997 10 24 10 39 69 6.9 -9 672.90 -52.2 -48.4 -51.9 64 -99 SPO 1997 10 24 10 40 69 6.9 -9 672.90 -52.2 -48.4 -51.9 64 -99 SPO 1997 10 24 10 41 69 6.9 -9 672.90 -52.4 -48.4 -51.9 65 -99 SPO 1997 10 24 10 42 70 6.8 -9 672.90 -52.4 -48.5 -51.9 65 -99 SPO 1997 10 24 10 43 70 6.8 -9 672.90 -52.2 -48.5 -51.9 64 -99 SPO 1997 10 24 10 44 70 6.9 -9 672.90 -52.2 -48.4 -51.9 64 -99 SPO 1997 10 24 10 45 71 6.7 -9 672.90 -52.2 -48.3 -51.9 64 -99 SPO 1997 10 24 10 46 70 6.7 -9 672.90 -52.2 -48.4 -51.9 64 -99 SPO 1997 10 24 10 47 70 6.5 -9 672.90 -52.2 -48.5 -51.9 64 -99 SPO 1997 10 24 10 48 70 6.3 -9 672.90 -52.2 -48.6 -51.9 64 -99 SPO 1997 10 24 10 49 71 6.2 -9 672.90 -52.2 -48.7 -51.9 64 -99 SPO 1997 10 24 10 50 70 6.6 -9 672.90 -52.2 -48.7 -51.9 64 -99 SPO 1997 10 24 10 51 70 6.5 -9 672.90 -52.2 -48.7 -51.9 64 -99 SPO 1997 10 24 10 52 70 6.4 -9 672.90 -52.2 -48.7 -51.9 64 -99 SPO 1997 10 24 10 53 70 6.5 -9 672.90 -52.4 -48.6 -51.9 66 -99 SPO 1997 10 24 10 54 70 6.3 -9 672.90 -52.4 -48.7 -52.0 65 -99 SPO 1997 10 24 10 55 70 6.3 -9 672.90 -52.4 -48.7 -52.0 65 -99 SPO 1997 10 24 10 56 69 6.4 -9 672.90 -52.4 -48.7 -52.0 65 -99 SPO 1997 10 24 10 57 68 6.6 -9 672.80 -52.5 -48.7 -52.0 65 -99 SPO 1997 10 24 10 58 68 6.8 -9 672.80 -52.5 -48.6 -52.1 65 -99 SPO 1997 10 24 10 59 68 7.0 -9 672.80 -52.5 -48.4 -52.1 65 -99 SPO 1997 10 24 11 00 68 6.9 -9 672.80 -52.5 -48.3 -52.2 65 0 SPO 1997 10 24 11 01 68 6.8 -9 672.80 -52.5 -48.3 -52.2 65 -99 SPO 1997 10 24 11 02 68 6.8 -9 672.80 -52.5 -48.4 -52.2 65 -99 SPO 1997 10 24 11 03 69 6.7 -9 672.80 -52.5 -48.4 -52.2 64 -99 SPO 1997 10 24 11 04 69 6.7 -9 672.80 -52.5 -48.4 -52.2 65 -99 SPO 1997 10 24 11 05 70 6.7 -9 672.80 -52.5 -48.3 -52.2 65 -99 SPO 1997 10 24 11 06 70 6.6 -9 672.80 -52.5 -48.3 -52.2 65 -99 SPO 1997 10 24 11 07 70 6.6 -9 672.80 -52.7 -48.4 -52.3 65 -99 SPO 1997 10 24 11 08 70 6.5 -9 672.80 -52.7 -48.5 -52.3 65 -99 SPO 1997 10 24 11 09 70 6.5 -9 672.80 -52.7 -48.7 -52.4 64 -99 SPO 1997 10 24 11 10 71 6.5 -9 672.80 -52.7 -48.9 -52.4 65 -99 SPO 1997 10 24 11 11 71 6.4 -9 672.80 -52.7 -49.0 -52.3 65 -99 SPO 1997 10 24 11 12 70 6.4 -9 672.80 -52.5 -49.2 -52.3 64 -99 SPO 1997 10 24 11 13 70 6.6 -9 672.80 -52.7 -49.2 -52.3 65 -99 SPO 1997 10 24 11 14 71 6.8 -9 672.80 -52.7 -49.3 -52.4 65 -99 SPO 1997 10 24 11 15 71 7.1 -9 672.80 -52.7 -49.2 -52.4 65 -99 SPO 1997 10 24 11 16 71 7.0 -9 672.80 -52.7 -49.1 -52.4 65 -99 SPO 1997 10 24 11 17 72 7.2 -9 672.80 -52.7 -49.1 -52.5 65 -99 SPO 1997 10 24 11 18 72 7.1 -9 672.80 -52.7 -49.2 -52.5 65 -99 SPO 1997 10 24 11 19 73 6.8 -9 672.80 -52.9 -49.2 -52.6 66 -99 SPO 1997 10 24 11 20 74 6.7 -9 672.80 -52.9 -49.2 -52.6 65 -99 SPO 1997 10 24 11 21 75 6.7 -9 672.80 -53.0 -49.2 -52.7 65 -99 SPO 1997 10 24 11 22 75 6.5 -9 672.80 -53.0 -49.3 -52.7 65 -99 SPO 1997 10 24 11 23 76 6.3 -9 672.80 -53.0 -49.5 -52.7 64 -99 SPO 1997 10 24 11 24 77 6.3 -9 672.80 -53.2 -49.6 -52.8 66 -99 SPO 1997 10 24 11 25 78 6.2 -9 672.80 -53.2 -49.7 -52.8 65 -99 SPO 1997 10 24 11 26 77 6.2 -9 672.80 -53.2 -49.8 -52.9 65 -99 SPO 1997 10 24 11 27 78 6.1 -9 672.80 -53.4 -49.8 -52.9 67 -99 SPO 1997 10 24 11 28 78 6.1 -9 672.80 -53.4 -49.9 -52.9 66 -99 SPO 1997 10 24 11 29 78 6.0 -9 672.80 -53.4 -50.0 -52.9 65 -99 SPO 1997 10 24 11 30 78 5.8 -9 672.80 -53.5 -50.2 -52.9 66 -99 SPO 1997 10 24 11 31 78 5.7 -9 672.80 -53.5 -50.4 -52.9 66 -99 SPO 1997 10 24 11 32 79 5.5 -9 672.80 -53.5 -50.6 -52.9 66 -99 SPO 1997 10 24 11 33 79 5.4 -9 672.80 -53.5 -50.7 -52.8 65 -99 SPO 1997 10 24 11 34 79 5.3 -9 672.80 -53.5 -50.8 -52.8 64 -99 SPO 1997 10 24 11 35 80 5.3 -9 672.80 -53.5 -50.9 -52.8 64 -99 SPO 1997 10 24 11 36 81 5.2 -9 672.80 -53.5 -51.0 -52.8 64 -99 SPO 1997 10 24 11 37 82 5.1 -9 672.80 -53.5 -51.1 -52.7 64 -99 SPO 1997 10 24 11 38 82 5.0 -9 672.80 -53.5 -51.1 -52.7 64 -99 SPO 1997 10 24 11 39 83 5.0 -9 672.80 -53.5 -51.2 -52.7 64 -99 SPO 1997 10 24 11 40 84 4.9 -9 672.80 -53.5 -51.2 -52.7 63 -99 SPO 1997 10 24 11 41 85 4.8 -9 672.90 -53.5 -51.3 -52.7 63 -99 SPO 1997 10 24 11 42 86 4.8 -9 672.90 -53.7 -51.4 -52.7 64 -99 SPO 1997 10 24 11 43 87 4.7 -9 672.90 -53.7 -51.5 -52.7 64 -99 SPO 1997 10 24 11 44 87 4.7 -9 672.90 -53.7 -51.5 -52.7 64 -99 SPO 1997 10 24 11 45 88 4.7 -9 672.90 -53.7 -51.5 -52.8 64 -99 SPO 1997 10 24 11 46 87 4.7 -9 672.90 -53.7 -51.5 -52.8 64 -99 SPO 1997 10 24 11 47 88 4.7 -9 672.90 -53.7 -51.5 -52.7 64 -99 SPO 1997 10 24 11 48 88 4.5 -9 672.90 -53.7 -51.5 -52.7 64 -99 SPO 1997 10 24 11 49 89 4.4 -9 672.90 -53.7 -51.5 -52.7 64 -99 SPO 1997 10 24 11 50 90 4.4 -9 673.00 -53.7 -51.4 -52.7 64 -99 SPO 1997 10 24 11 51 92 4.5 -9 673.00 -53.7 -51.4 -52.8 64 -99 SPO 1997 10 24 11 52 93 4.4 -9 673.00 -53.7 -51.5 -52.8 64 -99 SPO 1997 10 24 11 53 94 4.3 -9 673.00 -53.7 -51.5 -52.8 64 -99 SPO 1997 10 24 11 54 96 4.2 -9 673.00 -53.7 -51.5 -52.8 64 -99 SPO 1997 10 24 11 55 97 4.1 -9 673.00 -53.9 -51.5 -52.9 66 -99 SPO 1997 10 24 11 56 97 4.1 -9 673.00 -53.9 -51.5 -53.0 65 -99 SPO 1997 10 24 11 57 98 4.1 -9 673.00 -54.0 -51.4 -53.0 67 -99 SPO 1997 10 24 11 58 96 4.2 -9 673.00 -54.0 -51.5 -53.1 67 -99 SPO 1997 10 24 11 59 96 4.3 -9 673.00 -54.0 -51.5 -53.0 67 -99 SPO 1997 10 24 12 00 94 4.3 -9 672.90 -54.0 -51.4 -53.0 67 0 SPO 1997 10 24 12 01 93 4.5 -9 672.90 -54.0 -51.4 -52.9 66 -99 SPO 1997 10 24 12 02 91 4.6 -9 672.90 -53.9 -51.2 -52.9 65 -99 SPO 1997 10 24 12 03 88 4.7 -9 672.90 -53.9 -51.2 -52.8 65 -99 SPO 1997 10 24 12 04 87 4.8 -9 672.90 -53.9 -51.1 -52.8 65 -99 SPO 1997 10 24 12 05 86 5.0 -9 672.90 -53.9 -51.1 -52.9 66 -99 SPO 1997 10 24 12 06 84 5.0 -9 672.90 -53.9 -51.0 -52.9 67 -99 SPO 1997 10 24 12 07 83 5.1 -9 672.80 -53.7 -50.7 -52.9 65 -99 SPO 1997 10 24 12 08 83 5.3 -9 672.80 -53.7 -50.7 -52.9 66 -99 SPO 1997 10 24 12 09 83 5.3 -9 672.80 -53.7 -50.7 -52.9 66 -99 SPO 1997 10 24 12 10 82 5.2 -9 672.80 -53.7 -50.7 -52.9 66 -99 SPO 1997 10 24 12 11 82 5.2 -9 672.80 -53.9 -50.8 -52.9 68 -99 SPO 1997 10 24 12 12 81 5.3 -9 672.80 -53.9 -50.8 -53.0 68 -99 SPO 1997 10 24 12 13 80 5.4 -9 672.80 -54.0 -50.7 -53.0 69 -99 SPO 1997 10 24 12 14 78 5.7 -9 672.80 -54.0 -50.6 -53.1 68 -99 SPO 1997 10 24 12 15 77 6.1 -9 672.80 -54.0 -50.4 -53.2 68 -99 SPO 1997 10 24 12 16 77 6.3 -9 672.70 -54.0 -50.2 -53.2 67 -99 SPO 1997 10 24 12 17 77 6.4 -9 672.70 -53.9 -50.1 -53.3 66 -99 SPO 1997 10 24 12 18 77 6.4 -9 672.80 -53.7 -50.0 -53.2 64 -99 SPO 1997 10 24 12 19 76 6.6 -9 672.70 -53.7 -49.9 -53.2 64 -99 SPO 1997 10 24 12 20 75 6.6 -9 672.70 -53.7 -49.8 -53.2 66 -99 SPO 1997 10 24 12 21 75 6.7 -9 672.70 -53.7 -49.8 -53.2 66 -99 SPO 1997 10 24 12 22 74 6.8 -9 672.70 -53.7 -49.8 -53.2 67 -99 SPO 1997 10 24 12 23 74 6.8 -9 672.70 -53.5 -49.6 -53.2 66 -99 SPO 1997 10 24 12 24 73 6.7 -9 672.70 -53.5 -49.6 -53.2 67 -99 SPO 1997 10 24 12 25 72 6.4 -9 672.70 -53.5 -49.7 -53.2 66 -99 SPO 1997 10 24 12 26 72 6.2 -9 672.70 -53.5 -49.8 -53.3 66 -99 SPO 1997 10 24 12 27 72 6.1 -9 672.70 -53.7 -49.9 -53.3 67 -99 SPO 1997 10 24 12 28 71 6.1 -9 672.70 -53.5 -50.0 -53.3 65 -99 SPO 1997 10 24 12 29 72 6.3 -9 672.70 -53.5 -50.0 -53.2 64 -99 SPO 1997 10 24 12 30 72 6.7 -9 672.70 -53.2 -50.0 -53.0 63 -99 SPO 1997 10 24 12 31 71 6.8 -9 672.70 -53.0 -49.9 -52.9 61 -99 SPO 1997 10 24 12 32 71 6.9 -9 672.70 -53.0 -49.9 -52.8 62 -99 SPO 1997 10 24 12 33 71 6.9 -9 672.70 -53.0 -49.9 -52.8 64 -99 SPO 1997 10 24 12 34 72 6.5 -9 672.70 -53.0 -50.1 -52.8 65 -99 SPO 1997 10 24 12 35 71 6.4 -9 672.70 -53.0 -50.2 -52.8 66 -99 SPO 1997 10 24 12 36 71 6.3 -9 672.70 -53.2 -50.3 -52.9 68 -99 SPO 1997 10 24 12 37 71 6.2 -9 672.70 -53.2 -50.3 -52.9 68 -99 SPO 1997 10 24 12 38 71 6.1 -9 672.70 -53.0 -50.3 -52.9 66 -99 SPO 1997 10 24 12 39 71 6.3 -9 672.70 -53.0 -50.3 -52.8 66 -99 SPO 1997 10 24 12 40 71 6.2 -9 672.80 -53.0 -50.3 -52.8 65 -99 SPO 1997 10 24 12 41 71 6.1 -9 672.70 -53.0 -50.4 -52.8 65 -99 SPO 1997 10 24 12 42 71 6.2 -9 672.70 -53.0 -50.5 -52.8 66 -99 SPO 1997 10 24 12 43 70 6.2 -9 672.70 -53.0 -50.5 -52.8 66 -99 SPO 1997 10 24 12 44 70 6.4 -9 672.70 -53.0 -50.5 -52.8 65 -99 SPO 1997 10 24 12 45 69 6.4 -9 672.70 -53.0 -50.5 -52.8 66 -99 SPO 1997 10 24 12 46 68 6.3 -9 672.70 -53.0 -50.6 -52.8 66 -99 SPO 1997 10 24 12 47 69 5.8 -9 672.70 -53.0 -50.8 -52.8 66 -99 SPO 1997 10 24 12 48 69 5.6 -9 672.70 -53.0 -51.0 -52.9 66 -99 SPO 1997 10 24 12 49 70 5.5 -9 672.70 -53.2 -51.0 -52.9 67 -99 SPO 1997 10 24 12 50 72 5.5 -9 672.70 -53.2 -51.1 -52.9 66 -99 SPO 1997 10 24 12 51 72 5.3 -9 672.70 -53.2 -51.2 -52.9 66 -99 SPO 1997 10 24 12 52 71 5.2 -9 672.70 -53.2 -51.4 -52.9 65 -99 SPO 1997 10 24 12 53 73 5.1 -9 672.70 -53.2 -51.4 -52.9 65 -99 SPO 1997 10 24 12 54 75 5.0 -9 672.70 -53.2 -51.6 -52.9 66 -99 SPO 1997 10 24 12 55 78 4.9 -9 672.70 -53.2 -51.6 -52.8 65 -99 SPO 1997 10 24 12 56 80 4.6 -9 672.80 -53.4 -51.8 -52.7 67 -99 SPO 1997 10 24 12 57 85 4.3 -9 672.80 -53.4 -51.8 -52.6 65 -99 SPO 1997 10 24 12 58 92 4.1 -9 672.80 -53.4 -51.9 -52.6 64 -99 SPO 1997 10 24 12 59 101 3.7 -9 672.90 -53.4 -52.1 -52.8 64 -99 SPO 1997 10 24 13 00 115 3.4 -9 672.90 -53.5 -52.2 -53.0 64 0 SPO 1997 10 24 13 01 127 3.4 -9 672.90 -53.5 -52.4 -53.1 65 -99 SPO 1997 10 24 13 02 127 3.4 -9 672.90 -53.5 -52.5 -53.1 65 -99 SPO 1997 10 24 13 03 118 3.4 -9 672.90 -53.5 -52.4 -53.0 65 -99 SPO 1997 10 24 13 04 123 3.0 -9 673.00 -53.5 -52.3 -53.0 65 -99 SPO 1997 10 24 13 05 138 2.7 -9 673.00 -53.5 -52.6 -53.0 64 -99 SPO 1997 10 24 13 06 144 2.7 -9 673.00 -53.4 -52.9 -52.9 64 -99 SPO 1997 10 24 13 07 137 3.2 -9 673.00 -53.0 -52.9 -52.7 61 -99 SPO 1997 10 24 13 08 133 3.5 -9 673.00 -52.9 -52.6 -52.5 61 -99 SPO 1997 10 24 13 09 122 3.6 -9 672.90 -52.5 -52.4 -52.3 60 -99 SPO 1997 10 24 13 10 112 3.8 -9 672.90 -52.5 -52.2 -52.2 62 -99 SPO 1997 10 24 13 11 108 4.0 -9 672.90 -52.5 -51.9 -52.1 63 -99 SPO 1997 10 24 13 12 106 3.9 -9 672.90 -52.4 -51.6 -51.8 63 -99 SPO 1997 10 24 13 13 105 4.3 -9 672.90 -52.4 -51.4 -51.8 64 -99 SPO 1997 10 24 13 14 105 4.3 -9 672.90 -52.4 -51.3 -51.8 65 -99 SPO 1997 10 24 13 15 110 4.5 -9 672.90 -52.4 -51.2 -51.7 65 -99 SPO 1997 10 24 13 16 113 4.4 -9 672.90 -52.2 -51.0 -51.8 65 -99 SPO 1997 10 24 13 17 114 4.8 -9 672.90 -52.2 -50.9 -51.7 65 -99 SPO 1997 10 24 13 18 110 5.1 -9 672.90 -52.0 -50.8 -51.6 66 -99 SPO 1997 10 24 13 19 104 5.5 -9 672.80 -51.9 -50.7 -51.4 66 -99 SPO 1997 10 24 13 20 102 5.7 -9 672.80 -51.9 -50.5 -51.3 67 -99 SPO 1997 10 24 13 21 105 5.5 -9 672.80 -51.9 -50.3 -51.4 68 -99 SPO 1997 10 24 13 22 111 5.2 -9 672.90 -52.0 -50.2 -51.5 69 -99 SPO 1997 10 24 13 23 120 5.5 -9 672.90 -52.2 -50.4 -51.8 70 -99 SPO 1997 10 24 13 24 127 5.5 -9 672.90 -52.4 -50.4 -52.1 71 -99 SPO 1997 10 24 13 25 127 5.4 -9 672.90 -52.5 -50.5 -52.2 70 -99 SPO 1997 10 24 13 26 119 5.3 -9 672.90 -52.5 -50.5 -52.2 69 -99 SPO 1997 10 24 13 27 112 5.1 -9 672.90 -52.4 -50.3 -52.1 67 -99 SPO 1997 10 24 13 28 119 5.0 -9 672.90 -52.4 -50.1 -52.1 67 -99 SPO 1997 10 24 13 29 132 5.0 -9 672.90 -52.5 -50.2 -52.2 68 -99 SPO 1997 10 24 13 30 136 5.2 -9 672.90 -52.7 -50.6 -52.4 69 -99 SPO 1997 10 24 13 31 126 5.4 -9 672.90 -52.7 -50.6 -52.5 68 -99 SPO 1997 10 24 13 32 120 5.3 -9 672.90 -53.0 -50.5 -52.6 69 -99 SPO 1997 10 24 13 33 118 5.2 -9 672.90 -53.0 -50.4 -52.6 68 -99 SPO 1997 10 24 13 34 116 5.2 -9 672.90 -53.0 -50.4 -52.6 68 -99 SPO 1997 10 24 13 35 114 5.2 -9 672.90 -52.9 -50.5 -52.5 66 -99 SPO 1997 10 24 13 36 114 5.3 -9 672.80 -52.7 -50.5 -52.4 65 -99 SPO 1997 10 24 13 37 114 5.0 -9 672.80 -52.7 -50.6 -52.3 65 -99 SPO 1997 10 24 13 38 115 4.9 -9 672.80 -52.7 -50.7 -52.3 65 -99 SPO 1997 10 24 13 39 116 4.9 -9 672.90 -52.7 -50.7 -52.3 65 -99 SPO 1997 10 24 13 40 119 4.8 -9 672.90 -52.7 -50.8 -52.2 65 -99 SPO 1997 10 24 13 41 120 4.7 -9 672.90 -52.7 -50.8 -52.2 65 -99 SPO 1997 10 24 13 42 121 4.5 -9 672.90 -52.7 -50.9 -52.3 65 -99 SPO 1997 10 24 13 43 122 4.4 -9 672.80 -52.7 -51.0 -52.3 65 -99 SPO 1997 10 24 13 44 121 4.3 -9 672.80 -52.9 -51.2 -52.4 67 -99 SPO 1997 10 24 13 45 120 4.3 -9 672.80 -52.9 -51.2 -52.4 66 -99 SPO 1997 10 24 13 46 119 4.4 -9 672.80 -53.0 -51.2 -52.6 67 -99 SPO 1997 10 24 13 47 117 4.4 -9 672.80 -53.2 -51.2 -52.7 68 -99 SPO 1997 10 24 13 48 114 4.5 -9 672.80 -53.2 -51.2 -52.7 67 -99 SPO 1997 10 24 13 49 113 4.6 -9 672.80 -53.2 -51.0 -52.7 66 -99 SPO 1997 10 24 13 50 114 4.6 -9 672.80 -53.2 -51.0 -52.7 66 -99 SPO 1997 10 24 13 51 118 4.7 -9 672.80 -53.2 -51.0 -52.7 65 -99 SPO 1997 10 24 13 52 114 5.2 -9 672.80 -53.2 -50.8 -52.8 65 -99 SPO 1997 10 24 13 53 110 5.5 -9 672.80 -53.2 -50.7 -52.7 65 -99 SPO 1997 10 24 13 54 108 5.5 -9 672.80 -53.0 -50.5 -52.5 64 -99 SPO 1997 10 24 13 55 110 5.4 -9 672.80 -53.0 -50.6 -52.4 63 -99 SPO 1997 10 24 13 56 114 5.1 -9 672.80 -53.0 -50.6 -52.5 63 -99 SPO 1997 10 24 13 57 115 5.0 -9 672.80 -53.2 -50.7 -52.6 65 -99 SPO 1997 10 24 13 58 115 4.8 -9 672.80 -53.2 -50.7 -52.6 65 -99 SPO 1997 10 24 13 59 117 4.7 -9 672.80 -53.0 -50.7 -52.6 64 -99 SPO 1997 10 24 14 00 119 4.6 -9 672.80 -53.2 -50.6 -52.6 66 0 SPO 1997 10 24 14 01 120 4.6 -9 672.90 -53.2 -50.6 -52.6 66 -99 SPO 1997 10 24 14 02 122 4.6 -9 672.90 -53.2 -50.6 -52.6 65 -99 SPO 1997 10 24 14 03 122 4.7 -9 672.90 -53.2 -50.7 -52.6 66 -99 SPO 1997 10 24 14 04 122 4.8 -9 672.90 -53.2 -50.6 -52.6 65 -99 SPO 1997 10 24 14 05 121 4.9 -9 672.90 -53.0 -50.6 -52.5 64 -99 SPO 1997 10 24 14 06 118 5.1 -9 672.90 -53.0 -50.5 -52.4 63 -99 SPO 1997 10 24 14 07 116 5.2 -9 672.80 -52.9 -50.4 -52.3 62 -99 SPO 1997 10 24 14 08 114 5.3 -9 672.80 -52.7 -50.3 -52.2 62 -99 SPO 1997 10 24 14 09 114 5.3 -9 672.80 -52.5 -50.2 -52.1 61 -99 SPO 1997 10 24 14 10 113 5.4 -9 672.80 -52.5 -50.0 -52.0 62 -99 SPO 1997 10 24 14 11 113 5.3 -9 672.80 -52.5 -49.9 -51.8 62 -99 SPO 1997 10 24 14 12 112 5.3 -9 672.80 -52.5 -49.8 -51.7 63 -99 SPO 1997 10 24 14 13 112 5.3 -9 672.80 -52.4 -49.8 -51.6 62 -99 SPO 1997 10 24 14 14 111 5.2 -9 672.70 -52.2 -49.8 -51.5 62 -99 SPO 1997 10 24 14 15 113 5.1 -9 672.70 -52.2 -49.9 -51.5 62 -99 SPO 1997 10 24 14 16 112 5.2 -9 672.70 -52.2 -49.9 -51.5 64 -99 SPO 1997 10 24 14 17 112 5.3 -9 672.70 -52.2 -50.0 -51.5 64 -99 SPO 1997 10 24 14 18 113 5.2 -9 672.70 -52.2 -50.1 -51.6 64 -99 SPO 1997 10 24 14 19 115 5.2 -9 672.70 -52.2 -50.2 -51.7 64 -99 SPO 1997 10 24 14 20 119 5.3 -9 672.70 -52.2 -50.3 -51.8 64 -99 SPO 1997 10 24 14 21 119 5.3 -9 672.70 -52.4 -50.4 -52.0 65 -99 SPO 1997 10 24 14 22 114 5.3 -9 672.60 -52.5 -50.4 -51.9 65 -99 SPO 1997 10 24 14 23 110 5.5 -9 672.60 -52.5 -50.4 -51.8 65 -99 SPO 1997 10 24 14 24 106 5.9 -9 672.60 -52.5 -50.3 -51.7 65 -99 SPO 1997 10 24 14 25 105 6.0 -9 672.60 -52.4 -50.2 -51.6 64 -99 SPO 1997 10 24 14 26 104 6.0 -9 672.60 -52.2 -50.1 -51.5 63 -99 SPO 1997 10 24 14 27 104 6.0 -9 672.60 -52.2 -50.1 -51.6 63 -99 SPO 1997 10 24 14 28 104 6.0 -9 672.60 -52.4 -50.0 -51.6 65 -99 SPO 1997 10 24 14 29 106 5.9 -9 672.60 -52.4 -49.9 -51.7 65 -99 SPO 1997 10 24 14 30 109 5.7 -9 672.60 -52.4 -49.9 -51.8 65 -99 SPO 1997 10 24 14 31 113 5.2 -9 672.60 -52.5 -50.1 -52.0 65 -99 SPO 1997 10 24 14 32 114 5.1 -9 672.60 -52.5 -50.4 -52.2 65 -99 SPO 1997 10 24 14 33 112 5.3 -9 672.60 -52.7 -50.6 -52.3 65 -99 SPO 1997 10 24 14 34 111 5.3 -9 672.60 -52.9 -50.8 -52.3 66 -99 SPO 1997 10 24 14 35 110 5.4 -9 672.50 -52.9 -50.8 -52.3 65 -99 SPO 1997 10 24 14 36 110 5.6 -9 672.50 -52.9 -50.8 -52.4 65 -99 SPO 1997 10 24 14 37 111 5.7 -9 672.50 -52.9 -50.8 -52.4 64 -99 SPO 1997 10 24 14 38 113 5.7 -9 672.50 -52.9 -50.8 -52.4 64 -99 SPO 1997 10 24 14 39 115 5.6 -9 672.50 -53.0 -50.9 -52.6 64 -99 SPO 1997 10 24 14 40 117 5.8 -9 672.50 -53.0 -51.0 -52.7 64 -99 SPO 1997 10 24 14 41 117 5.9 -9 672.50 -53.0 -50.9 -52.6 64 -99 SPO 1997 10 24 14 42 117 5.8 -9 672.50 -53.0 -50.9 -52.6 64 -99 SPO 1997 10 24 14 43 115 5.8 -9 672.50 -53.0 -50.8 -52.6 64 -99 SPO 1997 10 24 14 44 113 5.8 -9 672.50 -53.0 -50.8 -52.6 64 -99 SPO 1997 10 24 14 45 112 5.9 -9 672.50 -52.9 -50.8 -52.5 63 -99 SPO 1997 10 24 14 46 111 5.9 -9 672.50 -52.9 -50.7 -52.4 63 -99 SPO 1997 10 24 14 47 108 6.0 -9 672.50 -53.0 -50.5 -52.4 64 -99 SPO 1997 10 24 14 48 107 6.0 -9 672.50 -52.9 -50.6 -52.3 62 -99 SPO 1997 10 24 14 49 105 6.0 -9 672.50 -52.9 -50.6 -52.3 62 -99 SPO 1997 10 24 14 50 106 5.6 -9 672.50 -52.9 -50.6 -52.3 62 -99 SPO 1997 10 24 14 51 110 5.4 -9 672.50 -53.0 -50.8 -52.4 64 -99 SPO 1997 10 24 14 52 113 5.2 -9 672.50 -53.2 -50.9 -52.6 64 -99 SPO 1997 10 24 14 53 114 5.2 -9 672.50 -53.2 -51.0 -52.7 64 -99 SPO 1997 10 24 14 54 115 5.2 -9 672.60 -53.2 -51.1 -52.8 64 -99 SPO 1997 10 24 14 55 118 5.3 -9 672.60 -53.0 -51.1 -52.7 62 -99 SPO 1997 10 24 14 56 117 5.6 -9 672.60 -53.0 -51.1 -52.7 62 -99 SPO 1997 10 24 14 57 116 5.6 -9 672.60 -53.0 -51.0 -52.7 62 -99 SPO 1997 10 24 14 58 118 5.4 -9 672.60 -53.0 -51.2 -52.7 62 -99 SPO 1997 10 24 14 59 119 5.6 -9 672.60 -53.0 -51.2 -52.7 62 -99 SPO 1997 10 24 15 00 118 5.7 -9 672.60 -53.0 -51.2 -52.7 62 0 SPO 1997 10 24 15 01 118 5.6 -9 672.60 -53.0 -51.2 -52.7 61 -99 SPO 1997 10 24 15 02 115 5.5 -9 672.60 -53.0 -51.2 -52.7 61 -99 SPO 1997 10 24 15 03 114 5.2 -9 672.50 -53.2 -51.1 -52.8 63 -99 SPO 1997 10 24 15 04 113 5.1 -9 672.50 -53.2 -51.2 -52.8 62 -99 SPO 1997 10 24 15 05 111 5.3 -9 672.50 -53.4 -51.0 -52.8 64 -99 SPO 1997 10 24 15 06 111 5.2 -9 672.50 -53.2 -51.0 -52.7 62 -99 SPO 1997 10 24 15 07 111 5.3 -9 672.50 -53.0 -51.0 -52.5 61 -99 SPO 1997 10 24 15 08 112 5.1 -9 672.50 -52.9 -51.0 -52.5 61 -99 SPO 1997 10 24 15 09 114 5.1 -9 672.50 -53.0 -51.0 -52.6 61 -99 SPO 1997 10 24 15 10 113 5.2 -9 672.50 -53.0 -51.0 -52.6 62 -99 SPO 1997 10 24 15 11 113 5.2 -9 672.50 -53.0 -51.0 -52.6 63 -99 SPO 1997 10 24 15 12 112 5.1 -9 672.50 -53.0 -51.0 -52.6 63 -99 SPO 1997 10 24 15 13 111 5.1 -9 672.50 -53.0 -51.0 -52.6 63 -99 SPO 1997 10 24 15 14 110 5.1 -9 672.50 -53.0 -51.0 -52.6 62 -99 SPO 1997 10 24 15 15 110 5.1 -9 672.50 -53.0 -51.1 -52.6 62 -99 SPO 1997 10 24 15 16 110 5.0 -9 672.60 -53.0 -51.2 -52.5 61 -99 SPO 1997 10 24 15 17 110 5.0 -9 672.50 -53.2 -51.3 -52.6 62 -99 SPO 1997 10 24 15 18 109 4.8 -9 672.50 -53.2 -51.3 -52.6 62 -99 SPO 1997 10 24 15 19 109 4.9 -9 672.50 -53.2 -51.3 -52.6 62 -99 SPO 1997 10 24 15 20 107 4.8 -9 672.50 -53.2 -51.2 -52.6 63 -99 SPO 1997 10 24 15 21 107 4.9 -9 672.50 -53.2 -51.2 -52.5 62 -99 SPO 1997 10 24 15 22 108 4.9 -9 672.50 -53.2 -51.1 -52.5 63 -99 SPO 1997 10 24 15 23 108 5.0 -9 672.50 -53.2 -51.1 -52.6 63 -99 SPO 1997 10 24 15 24 108 4.9 -9 672.50 -53.2 -51.1 -52.6 63 -99 SPO 1997 10 24 15 25 108 4.9 -9 672.50 -53.2 -51.1 -52.7 63 -99 SPO 1997 10 24 15 26 108 4.8 -9 672.50 -53.2 -51.2 -52.6 62 -99 SPO 1997 10 24 15 27 107 4.8 -9 672.50 -53.2 -51.1 -52.7 62 -99 SPO 1997 10 24 15 28 106 4.7 -9 672.50 -53.2 -51.1 -52.7 61 -99 SPO 1997 10 24 15 29 105 4.8 -9 672.50 -53.4 -51.0 -52.7 63 -99 SPO 1997 10 24 15 30 104 4.9 -9 672.50 -53.4 -51.0 -52.7 62 -99 SPO 1997 10 24 15 31 103 5.0 -9 672.50 -53.4 -51.0 -52.6 63 -99 SPO 1997 10 24 15 32 102 5.3 -9 672.50 -53.2 -50.8 -52.6 62 -99 SPO 1997 10 24 15 33 102 5.5 -9 672.50 -53.2 -50.8 -52.4 62 -99 SPO 1997 10 24 15 34 101 5.7 -9 672.50 -53.0 -50.7 -52.3 61 -99 SPO 1997 10 24 15 35 100 5.9 -9 672.50 -53.0 -50.6 -52.2 61 -99 SPO 1997 10 24 15 36 99 5.9 -9 672.50 -52.9 -50.6 -52.1 61 -99 SPO 1997 10 24 15 37 97 6.1 -9 672.50 -52.7 -50.6 -52.1 62 -99 SPO 1997 10 24 15 38 97 6.1 -9 672.50 -52.7 -50.6 -52.0 62 -99 SPO 1997 10 24 15 39 96 6.2 -9 672.50 -52.7 -50.7 -52.0 63 -99 SPO 1997 10 24 15 40 96 6.4 -9 672.50 -52.7 -50.7 -52.0 63 -99 SPO 1997 10 24 15 41 97 6.4 -9 672.40 -52.7 -50.6 -52.1 64 -99 SPO 1997 10 24 15 42 99 6.5 -9 672.40 -52.7 -50.6 -52.1 64 -99 SPO 1997 10 24 15 43 100 6.7 -9 672.40 -52.7 -50.5 -52.1 64 -99 SPO 1997 10 24 15 44 101 6.6 -9 672.40 -52.7 -50.4 -52.1 65 -99 SPO 1997 10 24 15 45 100 6.6 -9 672.40 -52.7 -50.4 -52.1 65 -99 SPO 1997 10 24 15 46 100 6.7 -9 672.30 -52.7 -50.3 -52.2 65 -99 SPO 1997 10 24 15 47 100 6.7 -9 672.30 -52.7 -50.3 -52.2 65 -99 SPO 1997 10 24 15 48 100 6.7 -9 672.30 -52.9 -50.4 -52.3 66 -99 SPO 1997 10 24 15 49 100 6.7 -9 672.30 -53.0 -50.5 -52.4 66 -99 SPO 1997 10 24 15 50 100 6.6 -9 672.20 -53.0 -50.6 -52.4 65 -99 SPO 1997 10 24 15 51 100 6.7 -9 672.20 -53.0 -50.6 -52.4 65 -99 SPO 1997 10 24 15 52 100 6.6 -9 672.20 -53.0 -50.7 -52.4 65 -99 SPO 1997 10 24 15 53 100 6.5 -9 672.20 -53.0 -50.7 -52.4 64 -99 SPO 1997 10 24 15 54 100 6.5 -9 672.20 -53.0 -50.7 -52.4 63 -99 SPO 1997 10 24 15 55 101 6.5 -9 672.20 -53.0 -50.7 -52.4 63 -99 SPO 1997 10 24 15 56 100 6.3 -9 672.20 -52.7 -50.8 -52.3 61 -99 SPO 1997 10 24 15 57 100 6.1 -9 672.20 -52.9 -50.8 -52.3 63 -99 SPO 1997 10 24 15 58 100 6.0 -9 672.20 -52.9 -50.9 -52.3 63 -99 SPO 1997 10 24 15 59 100 5.8 -9 672.20 -53.0 -51.0 -52.3 64 -99 SPO 1997 10 24 16 00 101 5.8 -9 672.20 -53.0 -51.0 -52.3 64 0 SPO 1997 10 24 16 01 101 5.6 -9 672.20 -53.0 -51.1 -52.3 64 -99 SPO 1997 10 24 16 02 100 5.5 -9 672.30 -53.0 -51.2 -52.3 64 -99 SPO 1997 10 24 16 03 99 5.4 -9 672.30 -53.0 -51.2 -52.3 64 -99 SPO 1997 10 24 16 04 99 5.3 -9 672.30 -53.0 -51.3 -52.3 64 -99 SPO 1997 10 24 16 05 98 5.3 -9 672.30 -53.0 -51.3 -52.3 62 -99 SPO 1997 10 24 16 06 98 5.4 -9 672.30 -53.0 -51.3 -52.3 62 -99 SPO 1997 10 24 16 07 98 5.2 -9 672.30 -53.0 -51.4 -52.3 61 -99 SPO 1997 10 24 16 08 97 5.2 -9 672.20 -53.0 -51.4 -52.3 61 -99 SPO 1997 10 24 16 09 96 5.2 -9 672.20 -53.0 -51.4 -52.3 61 -99 SPO 1997 10 24 16 10 96 5.2 -9 672.20 -53.0 -51.4 -52.2 61 -99 SPO 1997 10 24 16 11 98 5.2 -9 672.20 -53.0 -51.4 -52.2 61 -99 SPO 1997 10 24 16 12 97 5.3 -9 672.20 -53.0 -51.5 -52.2 61 -99 SPO 1997 10 24 16 13 97 5.2 -9 672.20 -53.0 -51.5 -52.2 61 -99 SPO 1997 10 24 16 14 97 5.4 -9 672.20 -53.0 -51.6 -52.2 62 -99 SPO 1997 10 24 16 15 96 5.4 -9 672.20 -53.0 -51.5 -52.2 62 -99 SPO 1997 10 24 16 16 97 5.2 -9 672.20 -53.0 -51.6 -52.2 62 -99 SPO 1997 10 24 16 17 98 5.2 -9 672.20 -52.9 -51.6 -52.1 62 -99 SPO 1997 10 24 16 18 98 4.9 -9 672.20 -52.9 -51.6 -52.1 62 -99 SPO 1997 10 24 16 19 99 4.8 -9 672.10 -53.0 -51.6 -52.2 62 -99 SPO 1997 10 24 16 20 97 4.8 -9 672.10 -53.0 -51.7 -52.2 62 -99 SPO 1997 10 24 16 21 97 4.8 -9 672.10 -52.9 -51.7 -52.1 61 -99 SPO 1997 10 24 16 22 96 4.8 -9 672.10 -52.9 -51.7 -52.1 61 -99 SPO 1997 10 24 16 23 96 4.9 -9 672.10 -52.7 -51.7 -52.1 61 -99 SPO 1997 10 24 16 24 96 4.7 -9 672.10 -52.7 -51.6 -52.0 62 -99 SPO 1997 10 24 16 25 100 4.4 -9 672.10 -52.7 -51.7 -52.0 62 -99 SPO 1997 10 24 16 26 105 4.0 -9 672.20 -52.7 -51.8 -52.0 62 -99 SPO 1997 10 24 16 27 112 3.4 -9 672.20 -52.7 -51.9 -52.1 62 -99 SPO 1997 10 24 16 28 115 3.4 -9 672.20 -52.9 -52.0 -52.3 64 -99 SPO 1997 10 24 16 29 118 3.3 -9 672.20 -52.9 -52.1 -52.4 63 -99 SPO 1997 10 24 16 30 121 3.3 -9 672.20 -52.9 -52.1 -52.4 62 -99 SPO 1997 10 24 16 31 121 3.6 -9 672.20 -52.9 -52.1 -52.4 62 -99 SPO 1997 10 24 16 32 123 3.9 -9 672.20 -52.9 -52.1 -52.4 62 -99 SPO 1997 10 24 16 33 124 3.6 -9 672.20 -53.0 -52.2 -52.5 63 -99 SPO 1997 10 24 16 34 126 3.4 -9 672.20 -53.0 -52.2 -52.4 63 -99 SPO 1997 10 24 16 35 126 3.5 -9 672.20 -53.0 -52.2 -52.4 62 -99 SPO 1997 10 24 16 36 126 3.4 -9 672.20 -53.0 -52.2 -52.4 62 -99 SPO 1997 10 24 16 37 124 3.6 -9 672.20 -53.0 -52.2 -52.5 62 -99 SPO 1997 10 24 16 38 123 3.5 -9 672.20 -53.2 -52.3 -52.6 64 -99 SPO 1997 10 24 16 39 122 3.7 -9 672.20 -53.2 -52.2 -52.6 63 -99 SPO 1997 10 24 16 40 120 3.6 -9 672.20 -53.2 -52.3 -52.6 63 -99 SPO 1997 10 24 16 41 119 3.7 -9 672.20 -53.2 -52.3 -52.7 63 -99 SPO 1997 10 24 16 42 116 3.9 -9 672.20 -53.2 -52.3 -52.6 62 -99 SPO 1997 10 24 16 43 113 3.9 -9 672.20 -53.2 -52.2 -52.5 62 -99 SPO 1997 10 24 16 44 113 3.9 -9 672.10 -53.2 -52.3 -52.5 63 -99 SPO 1997 10 24 16 45 111 4.0 -9 672.10 -53.2 -52.3 -52.4 63 -99 SPO 1997 10 24 16 46 111 4.1 -9 672.10 -53.4 -52.3 -52.4 64 -99 SPO 1997 10 24 16 47 109 4.3 -9 672.10 -53.4 -52.3 -52.4 64 -99 SPO 1997 10 24 16 48 109 4.2 -9 672.10 -53.4 -52.3 -52.4 64 -99 SPO 1997 10 24 16 49 109 4.1 -9 672.10 -53.4 -52.3 -52.4 63 -99 SPO 1997 10 24 16 50 110 4.2 -9 672.10 -53.2 -52.4 -52.4 62 -99 SPO 1997 10 24 16 51 110 4.4 -9 672.10 -53.2 -52.4 -52.4 62 -99 SPO 1997 10 24 16 52 111 4.4 -9 672.10 -53.2 -52.4 -52.5 63 -99 SPO 1997 10 24 16 53 111 4.6 -9 672.10 -53.4 -52.3 -52.5 64 -99 SPO 1997 10 24 16 54 111 4.5 -9 672.10 -53.2 -52.3 -52.5 63 -99 SPO 1997 10 24 16 55 112 4.4 -9 672.10 -53.4 -52.2 -52.6 64 -99 SPO 1997 10 24 16 56 113 4.4 -9 672.00 -53.4 -52.3 -52.7 64 -99 SPO 1997 10 24 16 57 114 4.4 -9 672.00 -53.4 -52.3 -52.7 64 -99 SPO 1997 10 24 16 58 113 4.0 -9 672.00 -53.4 -52.2 -52.8 64 -99 SPO 1997 10 24 16 59 115 3.8 -9 672.00 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 17 00 114 3.8 -9 672.00 -53.5 -52.4 -52.8 64 0 SPO 1997 10 24 17 01 115 4.0 -9 672.00 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 17 02 117 3.7 -9 671.90 -53.5 -52.4 -52.8 63 -99 SPO 1997 10 24 17 03 117 3.6 -9 671.90 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 17 04 117 3.7 -9 671.90 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 17 05 118 3.6 -9 671.90 -53.5 -52.5 -52.9 64 -99 SPO 1997 10 24 17 06 117 3.5 -9 671.90 -53.5 -52.5 -52.9 64 -99 SPO 1997 10 24 17 07 118 3.4 -9 671.90 -53.5 -52.4 -53.0 64 -99 SPO 1997 10 24 17 08 115 3.1 -9 671.90 -53.7 -52.4 -53.0 65 -99 SPO 1997 10 24 17 09 114 2.9 -9 671.90 -53.7 -52.5 -52.9 65 -99 SPO 1997 10 24 17 10 116 2.6 -9 671.90 -53.5 -52.6 -52.8 63 -99 SPO 1997 10 24 17 11 104 2.8 -9 671.80 -53.5 -52.6 -52.8 63 -99 SPO 1997 10 24 17 12 106 3.0 -9 671.80 -53.7 -52.5 -52.8 64 -99 SPO 1997 10 24 17 13 107 3.4 -9 671.80 -53.5 -52.4 -52.7 63 -99 SPO 1997 10 24 17 14 104 3.5 -9 671.80 -53.2 -52.2 -52.4 61 -99 SPO 1997 10 24 17 15 102 4.1 -9 671.80 -53.0 -52.1 -52.2 61 -99 SPO 1997 10 24 17 16 102 4.1 -9 671.80 -52.7 -52.0 -52.0 60 -99 SPO 1997 10 24 17 17 104 4.5 -9 671.80 -52.7 -52.0 -51.9 62 -99 SPO 1997 10 24 17 18 104 4.0 -9 671.80 -52.7 -52.0 -52.0 62 -99 SPO 1997 10 24 17 19 103 4.7 -9 671.80 -52.7 -51.8 -51.9 63 -99 SPO 1997 10 24 17 20 106 4.3 -9 671.80 -52.7 -51.8 -51.9 65 -99 SPO 1997 10 24 17 21 108 4.1 -9 671.80 -52.7 -51.8 -52.0 65 -99 SPO 1997 10 24 17 22 108 4.2 -9 671.80 -52.9 -51.8 -52.1 67 -99 SPO 1997 10 24 17 23 109 4.2 -9 671.80 -52.9 -51.8 -52.1 67 -99 SPO 1997 10 24 17 24 107 4.5 -9 671.80 -52.9 -51.8 -52.1 66 -99 SPO 1997 10 24 17 25 108 5.0 -9 671.80 -52.7 -51.7 -52.1 65 -99 SPO 1997 10 24 17 26 106 5.0 -9 671.80 -52.7 -51.7 -52.1 64 -99 SPO 1997 10 24 17 27 105 5.1 -9 671.80 -52.7 -51.7 -52.0 65 -99 SPO 1997 10 24 17 28 104 5.1 -9 671.70 -52.7 -51.6 -51.9 64 -99 SPO 1997 10 24 17 29 102 5.3 -9 671.70 -52.5 -51.6 -51.8 63 -99 SPO 1997 10 24 17 30 101 5.4 -9 671.70 -52.5 -51.6 -51.8 65 -99 SPO 1997 10 24 17 31 98 5.5 -9 671.70 -52.5 -51.6 -51.8 65 -99 SPO 1997 10 24 17 32 99 5.5 -9 671.70 -52.5 -51.5 -51.7 66 -99 SPO 1997 10 24 17 33 99 5.6 -9 671.70 -52.5 -51.5 -51.7 66 -99 SPO 1997 10 24 17 34 101 5.4 -9 671.70 -52.4 -51.5 -51.7 66 -99 SPO 1997 10 24 17 35 103 5.0 -9 671.70 -52.5 -51.6 -51.7 67 -99 SPO 1997 10 24 17 36 104 5.1 -9 671.70 -52.5 -51.6 -51.8 67 -99 SPO 1997 10 24 17 37 105 5.2 -9 671.80 -52.5 -51.6 -51.8 67 -99 SPO 1997 10 24 17 38 104 4.7 -9 671.80 -52.5 -51.6 -51.7 66 -99 SPO 1997 10 24 17 39 104 4.6 -9 671.80 -52.5 -51.6 -51.7 66 -99 SPO 1997 10 24 17 40 105 4.7 -9 671.80 -52.5 -51.6 -51.7 66 -99 SPO 1997 10 24 17 41 106 4.7 -9 671.80 -52.5 -51.6 -51.8 65 -99 SPO 1997 10 24 17 42 110 4.5 -9 671.80 -52.5 -51.7 -51.8 65 -99 SPO 1997 10 24 17 43 112 4.3 -9 671.80 -52.5 -51.7 -51.9 64 -99 SPO 1997 10 24 17 44 114 4.1 -9 671.80 -52.7 -51.8 -52.0 65 -99 SPO 1997 10 24 17 45 115 4.2 -9 671.80 -52.7 -51.9 -52.1 65 -99 SPO 1997 10 24 17 46 118 4.2 -9 671.80 -52.7 -51.9 -52.2 66 -99 SPO 1997 10 24 17 47 119 4.2 -9 671.80 -52.7 -51.9 -52.2 65 -99 SPO 1997 10 24 17 48 119 4.6 -9 671.80 -52.7 -51.9 -52.3 65 -99 SPO 1997 10 24 17 49 119 4.9 -9 671.80 -52.7 -51.9 -52.4 65 -99 SPO 1997 10 24 17 50 118 5.3 -9 671.80 -52.7 -51.8 -52.4 65 -99 SPO 1997 10 24 17 51 115 5.7 -9 671.80 -52.5 -51.7 -52.1 64 -99 SPO 1997 10 24 17 52 114 5.8 -9 671.80 -52.4 -51.6 -52.0 64 -99 SPO 1997 10 24 17 53 113 5.4 -9 671.80 -52.2 -51.5 -52.0 62 -99 SPO 1997 10 24 17 54 112 5.2 -9 671.80 -52.4 -51.5 -52.1 64 -99 SPO 1997 10 24 17 55 112 5.2 -9 671.80 -52.5 -51.5 -52.1 64 -99 SPO 1997 10 24 17 56 112 4.9 -9 671.80 -52.5 -51.6 -52.1 64 -99 SPO 1997 10 24 17 57 113 4.6 -9 671.90 -52.5 -51.6 -52.1 64 -99 SPO 1997 10 24 17 58 113 4.4 -9 671.90 -52.7 -51.6 -52.2 65 -99 SPO 1997 10 24 17 59 112 4.6 -9 671.80 -52.7 -51.7 -52.2 65 -99 SPO 1997 10 24 18 00 108 4.5 -9 671.80 -52.9 -51.7 -52.2 66 0 SPO 1997 10 24 18 01 106 4.7 -9 671.80 -52.7 -51.7 -52.0 64 -99 SPO 1997 10 24 18 02 101 4.6 -9 671.80 -52.7 -51.8 -51.9 63 -99 SPO 1997 10 24 18 03 99 4.8 -9 671.80 -52.9 -51.8 -51.9 65 -99 SPO 1997 10 24 18 04 99 4.9 -9 671.80 -52.7 -51.9 -51.9 63 -99 SPO 1997 10 24 18 05 99 5.0 -9 671.80 -52.7 -51.9 -51.9 62 -99 SPO 1997 10 24 18 06 99 4.8 -9 671.80 -52.9 -52.0 -52.0 64 -99 SPO 1997 10 24 18 07 99 5.2 -9 671.80 -53.0 -52.0 -52.0 64 -99 SPO 1997 10 24 18 08 99 5.6 -9 671.80 -53.0 -51.9 -52.1 64 -99 SPO 1997 10 24 18 09 101 6.0 -9 671.80 -53.0 -51.9 -52.2 64 -99 SPO 1997 10 24 18 10 102 6.2 -9 671.80 -52.9 -51.9 -52.1 65 -99 SPO 1997 10 24 18 11 103 6.3 -9 671.80 -52.9 -51.8 -52.2 65 -99 SPO 1997 10 24 18 12 103 6.4 -9 671.70 -52.9 -51.8 -52.2 65 -99 SPO 1997 10 24 18 13 102 6.3 -9 671.70 -53.0 -51.8 -52.3 66 -99 SPO 1997 10 24 18 14 101 6.4 -9 671.70 -53.0 -51.8 -52.3 66 -99 SPO 1997 10 24 18 15 101 6.5 -9 671.70 -52.9 -51.8 -52.3 65 -99 SPO 1997 10 24 18 16 101 6.3 -9 671.70 -53.0 -51.8 -52.3 65 -99 SPO 1997 10 24 18 17 100 6.5 -9 671.70 -53.0 -51.8 -52.3 65 -99 SPO 1997 10 24 18 18 100 6.4 -9 671.70 -52.9 -51.8 -52.3 65 -99 SPO 1997 10 24 18 19 100 6.5 -9 671.70 -52.9 -51.8 -52.3 64 -99 SPO 1997 10 24 18 20 100 6.6 -9 671.60 -52.9 -51.7 -52.3 63 -99 SPO 1997 10 24 18 21 99 6.5 -9 671.60 -52.9 -51.7 -52.3 63 -99 SPO 1997 10 24 18 22 99 6.4 -9 671.70 -52.9 -51.8 -52.3 63 -99 SPO 1997 10 24 18 23 99 6.3 -9 671.60 -53.0 -51.8 -52.3 64 -99 SPO 1997 10 24 18 24 100 6.1 -9 671.60 -53.0 -51.8 -52.4 65 -99 SPO 1997 10 24 18 25 100 6.2 -9 671.70 -53.0 -51.9 -52.4 65 -99 SPO 1997 10 24 18 26 99 6.1 -9 671.60 -53.0 -51.9 -52.4 65 -99 SPO 1997 10 24 18 27 99 6.1 -9 671.70 -53.0 -51.9 -52.4 65 -99 SPO 1997 10 24 18 28 98 5.7 -9 671.60 -53.0 -51.9 -52.4 65 -99 SPO 1997 10 24 18 29 97 5.6 -9 671.60 -53.0 -51.9 -52.4 64 -99 SPO 1997 10 24 18 30 95 5.6 -9 671.60 -53.0 -51.9 -52.4 64 -99 SPO 1997 10 24 18 31 94 5.7 -9 671.60 -53.0 -51.9 -52.4 64 -99 SPO 1997 10 24 18 32 95 5.8 -9 671.60 -53.0 -51.9 -52.4 64 -99 SPO 1997 10 24 18 33 95 5.8 -9 671.60 -53.2 -51.9 -52.5 64 -99 SPO 1997 10 24 18 34 94 5.9 -9 671.60 -53.2 -51.9 -52.5 64 -99 SPO 1997 10 24 18 35 95 6.1 -9 671.60 -53.2 -51.9 -52.5 64 -99 SPO 1997 10 24 18 36 96 6.2 -9 671.50 -53.2 -51.9 -52.6 64 -99 SPO 1997 10 24 18 37 97 6.2 -9 671.50 -53.2 -51.9 -52.5 64 -99 SPO 1997 10 24 18 38 99 6.3 -9 671.50 -53.0 -52.0 -52.5 62 -99 SPO 1997 10 24 18 39 98 6.5 -9 671.50 -53.0 -52.0 -52.5 62 -99 SPO 1997 10 24 18 40 99 6.5 -9 671.50 -53.0 -52.0 -52.5 63 -99 SPO 1997 10 24 18 41 100 6.5 -9 671.50 -53.2 -52.0 -52.6 64 -99 SPO 1997 10 24 18 42 100 6.5 -9 671.50 -53.0 -52.0 -52.5 62 -99 SPO 1997 10 24 18 43 98 6.3 -9 671.50 -53.0 -52.0 -52.5 62 -99 SPO 1997 10 24 18 44 97 6.0 -9 671.50 -53.0 -52.1 -52.5 62 -99 SPO 1997 10 24 18 45 96 5.7 -9 671.50 -53.2 -52.2 -52.6 64 -99 SPO 1997 10 24 18 46 96 5.8 -9 671.50 -53.2 -52.2 -52.6 64 -99 SPO 1997 10 24 18 47 97 5.8 -9 671.50 -53.4 -52.2 -52.6 65 -99 SPO 1997 10 24 18 48 94 5.5 -9 671.50 -53.2 -52.2 -52.6 64 -99 SPO 1997 10 24 18 49 90 5.3 -9 671.50 -53.4 -52.3 -52.6 65 -99 SPO 1997 10 24 18 50 90 5.0 -9 671.50 -53.4 -52.4 -52.7 65 -99 SPO 1997 10 24 18 51 90 5.1 -9 671.50 -53.4 -52.4 -52.7 64 -99 SPO 1997 10 24 18 52 93 5.4 -9 671.50 -53.4 -52.4 -52.7 64 -99 SPO 1997 10 24 18 53 94 5.7 -9 671.50 -53.4 -52.4 -52.7 64 -99 SPO 1997 10 24 18 54 94 5.9 -9 671.50 -53.4 -52.4 -52.7 64 -99 SPO 1997 10 24 18 55 95 5.9 -9 671.50 -53.4 -52.3 -52.7 64 -99 SPO 1997 10 24 18 56 94 6.0 -9 671.50 -53.4 -52.3 -52.8 64 -99 SPO 1997 10 24 18 57 94 6.0 -9 671.50 -53.5 -52.3 -52.8 64 -99 SPO 1997 10 24 18 58 94 5.8 -9 671.50 -53.4 -52.4 -52.7 63 -99 SPO 1997 10 24 18 59 94 5.8 -9 671.50 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 19 00 94 5.7 -9 671.50 -53.5 -52.5 -52.8 64 0 SPO 1997 10 24 19 01 93 5.3 -9 671.50 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 19 02 93 5.3 -9 671.50 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 19 03 93 5.4 -9 671.50 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 19 04 93 5.1 -9 671.50 -53.5 -52.5 -52.8 64 -99 SPO 1997 10 24 19 05 95 5.2 -9 671.50 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 19 06 96 5.2 -9 671.50 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 19 07 98 5.3 -9 671.50 -53.5 -52.4 -52.8 64 -99 SPO 1997 10 24 19 08 99 5.0 -9 671.50 -53.5 -52.3 -52.8 63 -99 SPO 1997 10 24 19 09 100 5.1 -9 671.60 -53.5 -52.3 -52.8 63 -99 SPO 1997 10 24 19 10 101 5.0 -9 671.60 -53.5 -52.3 -52.8 63 -99 SPO 1997 10 24 19 11 103 4.8 -9 671.60 -53.5 -52.3 -52.8 62 -99 SPO 1997 10 24 19 12 104 4.8 -9 671.60 -53.5 -52.3 -52.8 62 -99 SPO 1997 10 24 19 13 105 4.5 -9 671.60 -53.5 -52.3 -52.8 62 -99 SPO 1997 10 24 19 14 107 4.5 -9 671.60 -53.5 -52.3 -52.9 62 -99 SPO 1997 10 24 19 15 107 4.5 -9 671.60 -53.7 -52.3 -52.9 64 -99 SPO 1997 10 24 19 16 108 4.5 -9 671.60 -53.7 -52.3 -53.0 64 -99 SPO 1997 10 24 19 17 108 4.3 -9 671.60 -53.5 -52.3 -53.0 62 -99 SPO 1997 10 24 19 18 109 4.5 -9 671.60 -53.5 -52.3 -52.9 62 -99 SPO 1997 10 24 19 19 109 4.4 -9 671.60 -53.5 -52.2 -52.8 62 -99 SPO 1997 10 24 19 20 108 4.4 -9 671.60 -53.5 -52.2 -52.8 62 -99 SPO 1997 10 24 19 21 109 4.8 -9 671.60 -53.5 -52.1 -52.8 62 -99 SPO 1997 10 24 19 22 108 4.9 -9 671.60 -53.5 -52.0 -52.7 63 -99 SPO 1997 10 24 19 23 110 4.8 -9 671.60 -53.5 -52.0 -52.7 63 -99 SPO 1997 10 24 19 24 111 4.8 -9 671.60 -53.5 -52.1 -52.7 63 -99 SPO 1997 10 24 19 25 112 4.8 -9 671.60 -53.5 -52.0 -52.8 63 -99 SPO 1997 10 24 19 26 111 4.8 -9 671.60 -53.5 -52.0 -52.8 64 -99 SPO 1997 10 24 19 27 112 4.8 -9 671.60 -53.5 -52.0 -52.8 64 -99 SPO 1997 10 24 19 28 112 5.3 -9 671.60 -53.4 -52.0 -52.8 63 -99 SPO 1997 10 24 19 29 112 5.1 -9 671.60 -53.4 -52.0 -52.8 64 -99 SPO 1997 10 24 19 30 113 5.2 -9 671.60 -53.4 -52.0 -52.8 64 -99 SPO 1997 10 24 19 31 113 5.1 -9 671.60 -53.4 -52.0 -52.8 64 -99 SPO 1997 10 24 19 32 114 5.2 -9 671.50 -53.4 -52.0 -52.8 64 -99 SPO 1997 10 24 19 33 111 5.1 -9 671.50 -53.4 -52.0 -52.8 64 -99 SPO 1997 10 24 19 34 111 5.1 -9 671.50 -53.4 -52.0 -52.6 64 -99 SPO 1997 10 24 19 35 112 5.0 -9 671.50 -53.4 -52.0 -52.6 64 -99 SPO 1997 10 24 19 36 113 5.0 -9 671.50 -53.2 -52.0 -52.6 62 -99 SPO 1997 10 24 19 37 115 4.9 -9 671.50 -53.4 -52.0 -52.6 64 -99 SPO 1997 10 24 19 38 117 4.9 -9 671.50 -53.5 -52.0 -52.8 64 -99 SPO 1997 10 24 19 39 119 4.8 -9 671.50 -53.5 -52.0 -53.0 65 -99 SPO 1997 10 24 19 40 122 4.6 -9 671.50 -53.7 -52.1 -53.1 66 -99 SPO 1997 10 24 19 41 120 4.7 -9 671.50 -53.9 -52.2 -53.2 67 -99 SPO 1997 10 24 19 42 118 4.8 -9 671.50 -53.9 -52.2 -53.2 66 -99 SPO 1997 10 24 19 43 117 4.8 -9 671.50 -53.7 -52.2 -53.1 64 -99 SPO 1997 10 24 19 44 114 5.1 -9 671.50 -53.5 -52.1 -52.9 62 -99 SPO 1997 10 24 19 45 112 5.1 -9 671.50 -53.4 -52.1 -52.7 61 -99 SPO 1997 10 24 19 46 111 5.0 -9 671.50 -53.4 -52.1 -52.6 62 -99 SPO 1997 10 24 19 47 110 5.0 -9 671.50 -53.4 -52.1 -52.6 62 -99 SPO 1997 10 24 19 48 111 5.1 -9 671.40 -53.5 -52.0 -52.6 63 -99 SPO 1997 10 24 19 49 112 5.0 -9 671.40 -53.5 -52.0 -52.7 64 -99 SPO 1997 10 24 19 50 111 5.0 -9 671.40 -53.5 -52.1 -52.7 64 -99 SPO 1997 10 24 19 51 109 4.9 -9 671.40 -53.4 -52.1 -52.6 63 -99 SPO 1997 10 24 19 52 108 4.8 -9 671.40 -53.2 -52.2 -52.5 63 -99 SPO 1997 10 24 19 53 110 4.7 -9 671.40 -53.2 -52.2 -52.5 64 -99 SPO 1997 10 24 19 54 110 4.8 -9 671.40 -53.2 -52.3 -52.5 65 -99 SPO 1997 10 24 19 55 111 4.9 -9 671.40 -53.4 -52.2 -52.6 67 -99 SPO 1997 10 24 19 56 110 4.8 -9 671.40 -53.4 -52.2 -52.7 67 -99 SPO 1997 10 24 19 57 110 4.8 -9 671.30 -53.4 -52.2 -52.7 67 -99 SPO 1997 10 24 19 58 112 5.0 -9 671.30 -53.5 -52.2 -52.8 67 -99 SPO 1997 10 24 19 59 112 5.2 -9 671.30 -53.5 -52.2 -52.9 67 -99 SPO 1997 10 24 20 00 111 4.9 -9 671.30 -53.5 -52.1 -52.8 66 0 SPO 1997 10 24 20 01 109 4.9 -9 671.30 -53.4 -52.2 -52.7 65 -99 SPO 1997 10 24 20 02 110 5.2 -9 671.20 -53.4 -52.2 -52.7 66 -99 SPO 1997 10 24 20 03 111 5.4 -9 671.20 -53.2 -52.2 -52.7 64 -99 SPO 1997 10 24 20 04 109 5.5 -9 671.20 -53.2 -52.2 -52.7 64 -99 SPO 1997 10 24 20 05 109 5.2 -9 671.20 -53.2 -52.2 -52.6 65 -99 SPO 1997 10 24 20 06 107 5.2 -9 671.20 -53.2 -52.2 -52.5 65 -99 SPO 1997 10 24 20 07 104 5.0 -9 671.20 -53.2 -52.2 -52.4 66 -99 SPO 1997 10 24 20 08 100 5.1 -9 671.20 -53.2 -52.2 -52.4 66 -99 SPO 1997 10 24 20 09 103 5.3 -9 671.20 -53.2 -52.2 -52.4 67 -99 SPO 1997 10 24 20 10 101 5.4 -9 671.20 -53.2 -52.2 -52.5 67 -99 SPO 1997 10 24 20 11 100 5.6 -9 671.20 -53.4 -52.2 -52.5 68 -99 SPO 1997 10 24 20 12 101 5.6 -9 671.20 -53.4 -52.3 -52.6 68 -99 SPO 1997 10 24 20 13 101 5.5 -9 671.10 -53.5 -52.2 -52.6 68 -99 SPO 1997 10 24 20 14 98 5.6 -9 671.20 -53.5 -52.2 -52.6 68 -99 SPO 1997 10 24 20 15 99 5.8 -9 671.20 -53.5 -52.3 -52.7 68 -99 SPO 1997 10 24 20 16 100 6.0 -9 671.10 -53.5 -52.2 -52.7 68 -99 SPO 1997 10 24 20 17 103 6.4 -9 671.10 -53.5 -52.1 -52.8 68 -99 SPO 1997 10 24 20 18 103 6.4 -9 671.00 -53.5 -52.0 -52.8 68 -99 SPO 1997 10 24 20 19 99 6.0 -9 671.10 -53.4 -52.0 -52.8 68 -99 SPO 1997 10 24 20 20 96 5.8 -9 671.10 -53.4 -52.0 -52.6 68 -99 SPO 1997 10 24 20 21 97 6.0 -9 671.10 -53.4 -52.0 -52.6 68 -99 SPO 1997 10 24 20 22 100 6.1 -9 671.10 -53.2 -52.0 -52.5 67 -99 SPO 1997 10 24 20 23 99 6.0 -9 671.10 -53.2 -52.0 -52.5 67 -99 SPO 1997 10 24 20 24 100 6.0 -9 671.10 -53.2 -52.0 -52.6 67 -99 SPO 1997 10 24 20 25 100 5.8 -9 671.10 -53.2 -52.0 -52.6 67 -99 SPO 1997 10 24 20 26 100 5.9 -9 671.10 -53.4 -52.0 -52.7 67 -99 SPO 1997 10 24 20 27 102 6.1 -9 671.10 -53.4 -51.9 -52.7 67 -99 SPO 1997 10 24 20 28 103 6.3 -9 671.10 -53.2 -51.9 -52.6 66 -99 SPO 1997 10 24 20 29 103 6.6 -9 671.00 -53.2 -52.0 -52.6 67 -99 SPO 1997 10 24 20 30 101 6.7 -9 670.80 -53.0 -52.0 -52.5 66 -99 SPO 1997 10 24 20 31 101 6.7 -9 670.90 -53.0 -51.9 -52.5 67 -99 SPO 1997 10 24 20 32 100 6.7 -9 670.90 -53.0 -51.9 -52.4 68 -99 SPO 1997 10 24 20 33 102 6.6 -9 670.90 -53.0 -51.9 -52.5 68 -99 SPO 1997 10 24 20 34 103 6.7 -9 670.90 -53.0 -51.9 -52.5 68 -99 SPO 1997 10 24 20 35 104 7.1 -9 670.90 -53.0 -52.0 -52.5 68 -99 SPO 1997 10 24 20 36 105 7.2 -9 670.90 -53.0 -52.0 -52.6 68 -99 SPO 1997 10 24 20 37 105 7.3 -9 670.80 -53.2 -52.0 -52.7 68 -99 SPO 1997 10 24 20 38 106 7.4 -9 670.80 -53.2 -52.0 -52.7 68 -99 SPO 1997 10 24 20 39 106 7.2 -9 670.80 -53.2 -51.9 -52.7 67 -99 SPO 1997 10 24 20 40 106 6.9 -9 670.80 -53.2 -51.9 -52.7 67 -99 SPO 1997 10 24 20 41 107 6.8 -9 670.80 -53.2 -52.0 -52.8 67 -99 SPO 1997 10 24 20 42 107 6.8 -9 670.80 -53.4 -52.0 -52.9 68 -99 SPO 1997 10 24 20 43 108 6.6 -9 670.80 -53.4 -52.1 -52.9 68 -99 SPO 1997 10 24 20 44 107 6.7 -9 670.80 -53.4 -52.1 -52.9 67 -99 SPO 1997 10 24 20 45 107 6.7 -9 670.80 -53.5 -52.2 -52.9 68 -99 SPO 1997 10 24 20 46 107 6.5 -9 670.80 -53.5 -52.2 -52.9 67 -99 SPO 1997 10 24 20 47 107 6.2 -9 670.80 -53.5 -52.3 -53.0 67 -99 SPO 1997 10 24 20 48 107 6.1 -9 670.80 -53.5 -52.4 -53.1 67 -99 SPO 1997 10 24 20 49 107 6.2 -9 670.80 -53.7 -52.4 -53.1 67 -99 SPO 1997 10 24 20 50 106 6.0 -9 670.80 -53.7 -52.4 -53.1 67 -99 SPO 1997 10 24 20 51 105 6.1 -9 670.80 -53.7 -52.4 -53.2 66 -99 SPO 1997 10 24 20 52 102 6.0 -9 670.80 -53.7 -52.3 -53.2 65 -99 SPO 1997 10 24 20 53 101 5.7 -9 670.80 -53.7 -52.3 -53.1 65 -99 SPO 1997 10 24 20 54 100 5.6 -9 670.80 -53.7 -52.4 -53.1 65 -99 SPO 1997 10 24 20 55 99 5.2 -9 670.90 -53.7 -52.4 -53.1 64 -99 SPO 1997 10 24 20 56 99 5.2 -9 670.90 -53.7 -52.5 -53.1 64 -99 SPO 1997 10 24 20 57 98 5.2 -9 671.00 -53.9 -52.5 -53.1 66 -99 SPO 1997 10 24 20 58 100 5.1 -9 671.00 -53.7 -52.5 -53.1 64 -99 SPO 1997 10 24 20 59 101 5.1 -9 671.00 -53.7 -52.5 -53.1 64 -99 SPO 1997 10 24 21 00 103 5.3 -9 671.00 -53.7 -52.5 -53.1 64 0 SPO 1997 10 24 21 01 102 5.2 -9 671.00 -53.7 -52.5 -53.1 64 -99 SPO 1997 10 24 21 02 105 5.4 -9 671.00 -53.7 -52.4 -53.1 64 -99 SPO 1997 10 24 21 03 106 5.7 -9 671.00 -53.7 -52.4 -53.2 64 -99 SPO 1997 10 24 21 04 107 5.8 -9 671.00 -53.7 -52.4 -53.2 64 -99 SPO 1997 10 24 21 05 107 6.1 -9 671.00 -53.5 -52.4 -53.2 62 -99 SPO 1997 10 24 21 06 107 6.2 -9 671.00 -53.5 -52.3 -53.1 62 -99 SPO 1997 10 24 21 07 106 6.2 -9 671.00 -53.5 -52.3 -53.1 63 -99 SPO 1997 10 24 21 08 105 6.3 -9 671.00 -53.5 -52.3 -53.0 64 -99 SPO 1997 10 24 21 09 103 6.4 -9 671.00 -53.4 -52.4 -52.9 64 -99 SPO 1997 10 24 21 10 102 6.5 -9 670.90 -53.2 -52.4 -52.8 63 -99 SPO 1997 10 24 21 11 102 6.6 -9 670.90 -53.2 -52.4 -52.8 64 -99 SPO 1997 10 24 21 12 102 6.6 -9 670.90 -53.2 -52.4 -52.8 65 -99 SPO 1997 10 24 21 13 103 6.8 -9 670.90 -53.2 -52.4 -52.8 65 -99 SPO 1997 10 24 21 14 102 7.0 -9 670.80 -53.2 -52.4 -52.8 65 -99 SPO 1997 10 24 21 15 103 7.2 -9 670.80 -53.2 -52.4 -52.9 64 -99 SPO 1997 10 24 21 16 103 7.4 -9 670.80 -53.2 -52.4 -52.8 64 -99 SPO 1997 10 24 21 17 103 7.1 -9 670.80 -53.2 -52.4 -52.8 64 -99 SPO 1997 10 24 21 18 102 7.1 -9 670.80 -53.2 -52.5 -52.8 64 -99 SPO 1997 10 24 21 19 102 6.8 -9 670.80 -53.2 -52.6 -52.8 65 -99 SPO 1997 10 24 21 20 100 6.9 -9 670.80 -53.2 -52.7 -52.9 65 -99 SPO 1997 10 24 21 21 99 6.8 -9 670.80 -53.2 -52.7 -52.9 65 -99 SPO 1997 10 24 21 22 99 6.8 -9 670.70 -53.2 -52.7 -52.9 66 -99 SPO 1997 10 24 21 23 99 7.0 -9 670.70 -53.4 -52.7 -53.0 68 -99 SPO 1997 10 24 21 24 98 7.1 -9 670.70 -53.4 -52.6 -53.0 67 -99 SPO 1997 10 24 21 25 98 7.0 -9 670.70 -53.4 -52.6 -53.1 67 -99 SPO 1997 10 24 21 26 97 7.0 -9 670.70 -53.4 -52.6 -53.1 66 -99 SPO 1997 10 24 21 27 97 7.0 -9 670.60 -53.4 -52.5 -53.1 65 -99 SPO 1997 10 24 21 28 96 6.9 -9 670.60 -53.4 -52.5 -53.1 65 -99 SPO 1997 10 24 21 29 96 7.0 -9 670.60 -53.5 -52.6 -53.2 66 -99 SPO 1997 10 24 21 30 97 7.0 -9 670.60 -53.5 -52.6 -53.2 65 -99 SPO 1997 10 24 21 31 97 7.0 -9 670.60 -53.5 -52.6 -53.2 66 -99 SPO 1997 10 24 21 32 97 7.2 -9 670.60 -53.5 -52.5 -53.2 66 -99 SPO 1997 10 24 21 33 97 7.1 -9 670.60 -53.5 -52.6 -53.2 66 -99 SPO 1997 10 24 21 34 98 7.1 -9 670.60 -53.5 -52.5 -53.2 66 -99 SPO 1997 10 24 21 35 98 7.3 -9 670.60 -53.5 -52.5 -53.2 66 -99 SPO 1997 10 24 21 36 97 7.4 -9 670.60 -53.5 -52.6 -53.2 66 -99 SPO 1997 10 24 21 37 97 7.3 -9 670.60 -53.5 -52.6 -53.3 66 -99 SPO 1997 10 24 21 38 99 7.3 -9 670.60 -53.5 -52.6 -53.2 65 -99 SPO 1997 10 24 21 39 99 7.5 -9 670.50 -53.5 -52.6 -53.2 65 -99 SPO 1997 10 24 21 40 99 7.3 -9 670.60 -53.5 -52.6 -53.3 64 -99 SPO 1997 10 24 21 41 100 6.9 -9 670.60 -53.5 -52.6 -53.3 64 -99 SPO 1997 10 24 21 42 101 6.7 -9 670.60 -53.5 -52.7 -53.3 64 -99 SPO 1997 10 24 21 43 100 6.7 -9 670.60 -53.7 -52.7 -53.3 66 -99 SPO 1997 10 24 21 44 101 6.7 -9 670.60 -53.7 -52.7 -53.3 65 -99 SPO 1997 10 24 21 45 102 6.4 -9 670.60 -53.7 -52.7 -53.3 65 -99 SPO 1997 10 24 21 46 102 6.5 -9 670.60 -53.7 -52.7 -53.3 66 -99 SPO 1997 10 24 21 47 102 6.4 -9 670.60 -53.7 -52.7 -53.3 66 -99 SPO 1997 10 24 21 48 102 6.6 -9 670.60 -53.7 -52.7 -53.3 65 -99 SPO 1997 10 24 21 49 102 6.5 -9 670.60 -53.7 -52.7 -53.3 66 -99 SPO 1997 10 24 21 50 103 6.5 -9 670.60 -53.5 -52.7 -53.3 64 -99 SPO 1997 10 24 21 51 103 6.5 -9 670.60 -53.5 -52.8 -53.3 63 -99 SPO 1997 10 24 21 52 104 6.5 -9 670.60 -53.5 -52.8 -53.3 63 -99 SPO 1997 10 24 21 53 105 6.2 -9 670.60 -53.5 -52.9 -53.3 64 -99 SPO 1997 10 24 21 54 103 5.9 -9 670.60 -53.5 -53.0 -53.2 64 -99 SPO 1997 10 24 21 55 101 5.9 -9 670.60 -53.5 -53.1 -53.2 64 -99 SPO 1997 10 24 21 56 100 5.7 -9 670.60 -53.5 -53.1 -53.2 64 -99 SPO 1997 10 24 21 57 100 5.7 -9 670.60 -53.5 -53.1 -53.2 64 -99 SPO 1997 10 24 21 58 97 5.9 -9 670.60 -53.5 -53.1 -53.2 64 -99 SPO 1997 10 24 21 59 97 6.2 -9 670.60 -53.5 -53.1 -53.1 64 -99 SPO 1997 10 24 22 00 97 6.6 -9 670.60 -53.5 -53.1 -53.1 64 0 SPO 1997 10 24 22 01 97 6.8 -9 670.50 -53.5 -53.0 -53.1 65 -99 SPO 1997 10 24 22 02 97 7.0 -9 670.50 -53.5 -53.0 -53.1 65 -99 SPO 1997 10 24 22 03 97 7.2 -9 670.40 -53.5 -53.0 -53.2 64 -99 SPO 1997 10 24 22 04 97 7.4 -9 670.40 -53.5 -52.9 -53.1 64 -99 SPO 1997 10 24 22 05 97 7.5 -9 670.40 -53.5 -53.0 -53.1 64 -99 SPO 1997 10 24 22 06 96 7.6 -9 670.40 -53.5 -52.9 -53.1 64 -99 SPO 1997 10 24 22 07 96 7.7 -9 670.40 -53.5 -52.9 -53.1 65 -99 SPO 1997 10 24 22 08 96 7.5 -9 670.40 -53.5 -52.9 -53.1 66 -99 SPO 1997 10 24 22 09 96 7.7 -9 670.40 -53.5 -53.0 -53.1 66 -99 SPO 1997 10 24 22 10 95 7.3 -9 670.40 -53.5 -53.0 -53.1 66 -99 SPO 1997 10 24 22 11 96 7.3 -9 670.40 -53.7 -53.0 -53.1 68 -99 SPO 1997 10 24 22 12 96 7.1 -9 670.40 -53.7 -53.0 -53.2 67 -99 SPO 1997 10 24 22 13 96 7.2 -9 670.40 -53.7 -53.0 -53.2 67 -99 SPO 1997 10 24 22 14 96 7.0 -9 670.40 -53.7 -53.0 -53.2 67 -99 SPO 1997 10 24 22 15 97 7.0 -9 670.30 -53.7 -53.0 -53.2 67 -99 SPO 1997 10 24 22 16 97 7.0 -9 670.40 -53.7 -53.0 -53.2 66 -99 SPO 1997 10 24 22 17 97 6.9 -9 670.40 -53.7 -53.0 -53.2 64 -99 SPO 1997 10 24 22 18 98 6.7 -9 670.30 -53.7 -53.0 -53.2 64 -99 SPO 1997 10 24 22 19 98 6.5 -9 670.30 -53.7 -53.0 -53.3 64 -99 SPO 1997 10 24 22 20 99 6.7 -9 670.30 -53.7 -53.0 -53.3 64 -99 SPO 1997 10 24 22 21 99 6.6 -9 670.30 -53.7 -53.1 -53.3 64 -99 SPO 1997 10 24 22 22 99 6.5 -9 670.30 -53.7 -53.1 -53.4 64 -99 SPO 1997 10 24 22 23 99 6.5 -9 670.30 -53.7 -53.1 -53.3 64 -99 SPO 1997 10 24 22 24 99 6.2 -9 670.30 -53.7 -53.1 -53.3 64 -99 SPO 1997 10 24 22 25 99 6.2 -9 670.30 -53.7 -53.2 -53.3 64 -99 SPO 1997 10 24 22 26 99 6.4 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 27 99 6.0 -9 670.30 -53.5 -53.2 -53.1 63 -99 SPO 1997 10 24 22 28 100 6.2 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 29 101 6.1 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 30 101 6.1 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 31 101 5.9 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 32 102 5.6 -9 670.30 -53.7 -53.2 -53.2 64 -99 SPO 1997 10 24 22 33 101 5.6 -9 670.30 -53.7 -53.2 -53.3 64 -99 SPO 1997 10 24 22 34 101 5.5 -9 670.30 -53.7 -53.2 -53.3 64 -99 SPO 1997 10 24 22 35 102 5.6 -9 670.30 -53.9 -53.2 -53.4 66 -99 SPO 1997 10 24 22 36 102 5.6 -9 670.30 -53.9 -53.2 -53.4 66 -99 SPO 1997 10 24 22 37 102 5.6 -9 670.30 -53.7 -53.2 -53.4 64 -99 SPO 1997 10 24 22 38 102 5.5 -9 670.30 -53.9 -53.2 -53.5 66 -99 SPO 1997 10 24 22 39 104 5.5 -9 670.30 -53.7 -53.1 -53.4 64 -99 SPO 1997 10 24 22 40 104 5.6 -9 670.20 -53.7 -53.1 -53.4 64 -99 SPO 1997 10 24 22 41 104 5.8 -9 670.20 -53.7 -53.1 -53.4 64 -99 SPO 1997 10 24 22 42 106 5.8 -9 670.20 -53.7 -53.2 -53.5 64 -99 SPO 1997 10 24 22 43 108 5.2 -9 670.20 -53.7 -53.2 -53.5 64 -99 SPO 1997 10 24 22 44 109 5.2 -9 670.30 -53.7 -53.2 -53.5 64 -99 SPO 1997 10 24 22 45 111 5.1 -9 670.30 -53.9 -53.2 -53.6 66 -99 SPO 1997 10 24 22 46 113 5.0 -9 670.30 -53.9 -53.3 -53.6 66 -99 SPO 1997 10 24 22 47 113 5.3 -9 670.20 -54.0 -53.3 -53.7 67 -99 SPO 1997 10 24 22 48 111 5.3 -9 670.20 -53.9 -53.2 -53.6 66 -99 SPO 1997 10 24 22 49 110 5.2 -9 670.20 -54.0 -53.2 -53.6 67 -99 SPO 1997 10 24 22 50 110 5.3 -9 670.30 -53.9 -53.2 -53.5 66 -99 SPO 1997 10 24 22 51 109 5.7 -9 670.20 -53.9 -53.2 -53.4 66 -99 SPO 1997 10 24 22 52 109 6.0 -9 670.20 -53.9 -53.2 -53.4 66 -99 SPO 1997 10 24 22 53 108 6.0 -9 670.10 -54.0 -53.1 -53.4 66 -99 SPO 1997 10 24 22 54 107 6.2 -9 670.10 -53.9 -53.1 -53.4 65 -99 SPO 1997 10 24 22 55 105 6.5 -9 670.10 -53.9 -53.1 -53.4 65 -99 SPO 1997 10 24 22 56 106 6.5 -9 670.10 -53.7 -53.1 -53.3 64 -99 SPO 1997 10 24 22 57 104 6.4 -9 670.10 -53.7 -53.1 -53.3 -99 -99 SPO 1997 10 24 22 58 103 6.4 -9 670.10 -53.7 -53.2 -53.2 -99 -99 SPO 1997 10 24 22 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 24 23 00 95 5.8 -9 670.10 -53.7 -53.3 -53.1 -99 0 SPO 1997 10 24 23 01 94 5.8 -9 670.20 -53.7 -53.3 -53.1 -99 -99 SPO 1997 10 24 23 02 93 6.5 -9 670.30 -53.7 -53.3 -53.0 67 -99 SPO 1997 10 24 23 03 90 5.8 -9 670.30 -53.5 -53.3 -53.0 66 -99 SPO 1997 10 24 23 04 89 6.1 -9 670.30 -53.7 -53.3 -53.1 67 -99 SPO 1997 10 24 23 05 91 6.5 -9 670.30 -53.7 -53.3 -53.1 67 -99 SPO 1997 10 24 23 06 93 6.6 -9 670.20 -53.7 -53.3 -53.1 67 -99 SPO 1997 10 24 23 07 94 6.8 -9 670.20 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 24 23 08 95 7.0 -9 670.20 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 24 23 09 97 7.1 -9 670.20 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 24 23 10 99 6.9 -9 670.20 -53.7 -53.2 -53.2 67 -99 SPO 1997 10 24 23 11 100 7.0 -9 670.20 -53.7 -53.3 -53.2 67 -99 SPO 1997 10 24 23 12 100 7.0 -9 670.20 -53.7 -53.3 -53.2 67 -99 SPO 1997 10 24 23 13 101 7.2 -9 670.20 -53.7 -53.3 -53.2 67 -99 SPO 1997 10 24 23 14 102 7.3 -9 670.10 -53.7 -53.3 -53.2 67 -99 SPO 1997 10 24 23 15 102 7.2 -9 670.10 -53.9 -53.4 -53.3 68 -99 SPO 1997 10 24 23 16 103 7.4 -9 670.10 -53.9 -53.4 -53.3 68 -99 SPO 1997 10 24 23 17 103 7.2 -9 670.10 -54.0 -53.3 -53.3 68 -99 SPO 1997 10 24 23 18 104 7.4 -9 670.10 -54.0 -53.3 -53.4 67 -99 SPO 1997 10 24 23 19 106 7.5 -9 670.10 -54.0 -53.3 -53.5 67 -99 SPO 1997 10 24 23 20 107 7.7 -9 670.10 -54.0 -53.3 -53.6 67 -99 SPO 1997 10 24 23 21 108 7.5 -9 670.10 -54.0 -53.3 -53.6 67 -99 SPO 1997 10 24 23 22 108 7.4 -9 670.10 -54.0 -53.3 -53.7 67 -99 SPO 1997 10 24 23 23 108 7.6 -9 670.10 -54.0 -53.3 -53.8 67 -99 SPO 1997 10 24 23 24 109 7.3 -9 670.10 -54.0 -53.3 -53.7 67 -99 SPO 1997 10 24 23 25 108 7.5 -9 670.10 -54.0 -53.3 -53.7 67 -99 SPO 1997 10 24 23 26 108 7.7 -9 670.10 -53.9 -53.3 -53.6 67 -99 SPO 1997 10 24 23 27 107 7.6 -9 670.10 -53.9 -53.2 -53.5 67 -99 SPO 1997 10 24 23 28 107 7.8 -9 670.10 -53.7 -53.3 -53.6 66 -99 SPO 1997 10 24 23 29 106 7.8 -9 670.00 -53.7 -53.3 -53.6 66 -99 SPO 1997 10 24 23 30 106 7.6 -9 670.10 -53.7 -53.3 -53.6 64 -99 SPO 1997 10 24 23 31 106 7.4 -9 670.10 -53.9 -53.4 -53.6 66 -99 SPO 1997 10 24 23 32 105 7.9 -9 670.00 -53.9 -53.4 -53.5 66 -99 SPO 1997 10 24 23 33 105 7.7 -9 670.10 -53.7 -53.4 -53.5 64 -99 SPO 1997 10 24 23 34 105 7.8 -9 670.00 -53.9 -53.4 -53.5 66 -99 SPO 1997 10 24 23 35 106 7.6 -9 670.00 -53.9 -53.4 -53.5 66 -99 SPO 1997 10 24 23 36 106 7.9 -9 670.00 -53.9 -53.4 -53.6 66 -99 SPO 1997 10 24 23 37 105 7.9 -9 670.00 -53.7 -53.3 -53.5 64 -99 SPO 1997 10 24 23 38 106 7.8 -9 670.00 -53.7 -53.3 -53.5 64 -99 SPO 1997 10 24 23 39 106 7.8 -9 670.00 -53.7 -53.4 -53.5 65 -99 SPO 1997 10 24 23 40 106 7.6 -9 670.00 -53.7 -53.3 -53.5 65 -99 SPO 1997 10 24 23 41 107 7.3 -9 670.00 -53.7 -53.4 -53.5 65 -99 SPO 1997 10 24 23 42 107 7.6 -9 670.00 -53.9 -53.4 -53.6 66 -99 SPO 1997 10 24 23 43 107 7.6 -9 670.00 -53.9 -53.4 -53.6 66 -99 SPO 1997 10 24 23 44 106 7.3 -9 670.00 -53.9 -53.4 -53.5 65 -99 SPO 1997 10 24 23 45 105 7.1 -9 670.00 -53.7 -53.5 -53.5 64 -99 SPO 1997 10 24 23 46 105 7.2 -9 670.00 -53.7 -53.5 -53.5 63 -99 SPO 1997 10 24 23 47 104 7.1 -9 670.00 -54.0 -53.6 -53.5 66 -99 SPO 1997 10 24 23 48 104 7.3 -9 670.00 -53.9 -53.6 -53.5 65 -99 SPO 1997 10 24 23 49 104 7.5 -9 670.00 -53.9 -53.6 -53.5 65 -99 SPO 1997 10 24 23 50 105 7.3 -9 670.00 -54.0 -53.6 -53.6 67 -99 SPO 1997 10 24 23 51 106 7.4 -9 670.00 -54.0 -53.6 -53.6 67 -99 SPO 1997 10 24 23 52 107 7.8 -9 670.00 -54.0 -53.6 -53.7 67 -99 SPO 1997 10 24 23 53 108 7.8 -9 669.90 -54.0 -53.6 -53.7 66 -99 SPO 1997 10 24 23 54 109 7.8 -9 669.90 -54.0 -53.7 -53.7 65 -99 SPO 1997 10 24 23 55 108 7.8 -9 669.90 -54.2 -53.7 -53.8 67 -99 SPO 1997 10 24 23 56 109 7.7 -9 669.90 -54.2 -53.7 -53.8 65 -99 SPO 1997 10 24 23 57 108 7.9 -9 669.80 -54.2 -53.7 -53.8 65 -99 SPO 1997 10 24 23 58 107 7.9 -9 669.80 -54.2 -53.7 -53.8 -99 -99 SPO 1997 10 24 23 59 108 7.9 -9 669.80 -54.2 -53.7 -53.8 -99 -99 SPO 1997 10 25 00 00 108 7.8 -9 669.80 -54.2 -53.7 -53.9 -99 0 SPO 1997 10 25 00 01 108 7.8 -9 669.80 -54.2 -53.7 -53.9 -99 -99 SPO 1997 10 25 00 02 107 7.7 -9 669.70 -54.2 -53.7 -53.9 -99 -99 SPO 1997 10 25 00 03 107 7.8 -9 669.70 -54.2 -53.7 -53.9 66 -99 SPO 1997 10 25 00 04 103 7.8 -9 669.70 -54.4 -53.9 -53.9 66 -99 SPO 1997 10 25 00 05 105 7.8 -9 669.70 -54.4 -53.9 -53.9 66 -99 SPO 1997 10 25 00 06 104 7.5 -9 669.70 -54.4 -53.9 -53.9 65 -99 SPO 1997 10 25 00 07 103 7.4 -9 669.70 -54.4 -53.9 -53.9 63 -99 SPO 1997 10 25 00 08 103 7.3 -9 669.70 -54.4 -53.9 -53.7 63 -99 SPO 1997 10 25 00 09 102 7.0 -9 669.70 -54.4 -53.9 -53.9 63 -99 SPO 1997 10 25 00 10 102 6.9 -9 669.70 -54.4 -53.9 -53.9 63 -99 SPO 1997 10 25 00 11 104 6.9 -9 669.70 -54.4 -53.9 -53.9 63 -99 SPO 1997 10 25 00 12 105 7.0 -9 669.70 -54.5 -53.9 -53.9 64 -99 SPO 1997 10 25 00 13 105 7.1 -9 669.70 -54.5 -54.0 -53.9 64 -99 SPO 1997 10 25 00 14 103 7.0 -9 669.70 -54.5 -54.0 -53.9 64 -99 SPO 1997 10 25 00 15 102 7.0 -9 669.70 -54.5 -54.0 -53.9 64 -99 SPO 1997 10 25 00 16 105 7.3 -9 669.60 -54.5 -54.0 -54.0 64 -99 SPO 1997 10 25 00 17 105 7.2 -9 669.60 -54.5 -54.0 -54.0 64 -99 SPO 1997 10 25 00 18 105 7.0 -9 669.60 -54.5 -54.0 -54.0 63 -99 SPO 1997 10 25 00 19 105 7.3 -9 669.60 -54.5 -53.9 -54.0 62 -99 SPO 1997 10 25 00 20 104 7.3 -9 669.60 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 00 21 105 7.3 -9 669.60 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 00 22 104 7.3 -9 669.60 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 00 23 104 7.2 -9 669.60 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 00 24 105 7.2 -9 669.60 -54.5 -54.0 -54.0 63 -99 SPO 1997 10 25 00 25 106 7.4 -9 669.60 -54.5 -54.0 -54.0 63 -99 SPO 1997 10 25 00 26 107 7.2 -9 669.60 -54.5 -54.0 -54.0 63 -99 SPO 1997 10 25 00 27 107 7.3 -9 669.60 -54.5 -54.0 -54.0 64 -99 SPO 1997 10 25 00 28 106 7.0 -9 669.60 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 29 107 6.9 -9 669.60 -54.5 -54.0 -54.2 63 -99 SPO 1997 10 25 00 30 107 7.1 -9 669.60 -54.5 -54.0 -54.2 62 -99 SPO 1997 10 25 00 31 105 7.1 -9 669.60 -54.4 -54.0 -54.2 61 -99 SPO 1997 10 25 00 32 106 7.3 -9 669.60 -54.4 -54.0 -54.2 61 -99 SPO 1997 10 25 00 33 107 7.4 -9 669.50 -54.4 -54.0 -54.2 61 -99 SPO 1997 10 25 00 34 107 7.1 -9 669.50 -54.5 -54.2 -54.4 62 -99 SPO 1997 10 25 00 35 104 6.9 -9 669.60 -54.5 -54.2 -54.4 62 -99 SPO 1997 10 25 00 36 106 7.3 -9 669.50 -54.5 -54.2 -54.2 62 -99 SPO 1997 10 25 00 37 107 7.0 -9 669.50 -54.5 -54.2 -54.4 62 -99 SPO 1997 10 25 00 38 104 6.8 -9 669.60 -54.5 -54.2 -54.4 62 -99 SPO 1997 10 25 00 39 107 7.1 -9 669.50 -54.5 -54.2 -54.4 63 -99 SPO 1997 10 25 00 40 108 7.3 -9 669.50 -54.5 -54.2 -54.5 64 -99 SPO 1997 10 25 00 41 106 7.2 -9 669.50 -54.5 -54.2 -54.5 64 -99 SPO 1997 10 25 00 42 106 7.3 -9 669.50 -54.5 -54.2 -54.4 63 -99 SPO 1997 10 25 00 43 106 7.3 -9 669.40 -54.5 -54.2 -54.4 63 -99 SPO 1997 10 25 00 44 105 7.2 -9 669.40 -54.5 -54.0 -54.2 63 -99 SPO 1997 10 25 00 45 105 7.2 -9 669.40 -54.7 -54.0 -54.2 63 -99 SPO 1997 10 25 00 46 106 7.3 -9 669.40 -54.5 -54.0 -54.2 62 -99 SPO 1997 10 25 00 47 106 7.2 -9 669.40 -54.5 -54.0 -54.2 62 -99 SPO 1997 10 25 00 48 106 7.6 -9 669.40 -54.5 -54.0 -54.2 62 -99 SPO 1997 10 25 00 49 108 7.3 -9 669.30 -54.4 -54.0 -54.2 62 -99 SPO 1997 10 25 00 50 107 7.2 -9 669.30 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 51 106 7.1 -9 669.40 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 52 107 7.1 -9 669.40 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 53 107 7.1 -9 669.40 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 54 107 6.9 -9 669.40 -54.5 -54.0 -54.2 64 -99 SPO 1997 10 25 00 55 107 6.6 -9 669.40 -54.5 -54.0 -54.2 63 -99 SPO 1997 10 25 00 56 107 6.6 -9 669.40 -54.7 -54.0 -54.2 64 -99 SPO 1997 10 25 00 57 107 6.5 -9 669.40 -54.7 -54.0 -54.2 63 -99 SPO 1997 10 25 00 58 107 6.5 -9 669.40 -54.7 -54.0 -54.2 63 -99 SPO 1997 10 25 00 59 106 6.3 -9 669.40 -54.7 -54.0 -54.2 63 -99 SPO 1997 10 25 01 00 106 6.0 -9 669.40 -54.7 -54.0 -54.2 63 0 SPO 1997 10 25 01 01 104 5.9 -9 669.50 -54.7 -54.0 -54.0 63 -99 SPO 1997 10 25 01 02 100 5.5 -9 669.50 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 01 03 100 5.6 -9 669.60 -54.5 -54.0 -54.0 62 -99 SPO 1997 10 25 01 04 102 5.5 -9 669.50 -54.5 -54.0 -53.9 62 -99 SPO 1997 10 25 01 05 100 5.4 -9 669.50 -54.5 -54.0 -53.9 62 -99 SPO 1997 10 25 01 06 100 5.5 -9 669.50 -54.5 -54.0 -53.7 62 -99 SPO 1997 10 25 01 07 99 5.5 -9 669.50 -54.5 -53.9 -53.7 62 -99 SPO 1997 10 25 01 08 96 5.7 -9 669.60 -54.5 -53.9 -53.7 62 -99 SPO 1997 10 25 01 09 92 5.5 -9 669.60 -54.4 -53.9 -53.7 61 -99 SPO 1997 10 25 01 10 92 5.7 -9 669.60 -54.4 -53.9 -53.7 62 -99 SPO 1997 10 25 01 11 93 5.5 -9 669.60 -54.2 -53.9 -53.5 60 -99 SPO 1997 10 25 01 12 90 6.1 -9 669.50 -54.2 -53.7 -53.5 62 -99 SPO 1997 10 25 01 13 88 5.9 -9 669.60 -54.2 -53.7 -53.5 62 -99 SPO 1997 10 25 01 14 89 6.0 -9 669.60 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 15 90 6.0 -9 669.50 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 16 90 5.9 -9 669.50 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 17 90 6.0 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 18 90 6.2 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 19 90 6.1 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 20 92 6.1 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 21 95 6.0 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 22 96 6.0 -9 669.50 -54.2 -53.7 -53.5 64 -99 SPO 1997 10 25 01 23 98 6.2 -9 669.50 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 24 96 6.4 -9 669.50 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 25 96 6.6 -9 669.50 -54.2 -53.7 -53.5 63 -99 SPO 1997 10 25 01 26 99 6.6 -9 669.40 -54.2 -53.9 -53.5 64 -99 SPO 1997 10 25 01 27 97 6.7 -9 669.50 -54.2 -53.7 -53.5 66 -99 SPO 1997 10 25 01 28 99 6.9 -9 669.40 -54.2 -53.7 -53.5 66 -99 SPO 1997 10 25 01 29 97 6.9 -9 669.50 -54.2 -53.7 -53.5 66 -99 SPO 1997 10 25 01 30 100 6.8 -9 669.50 -54.2 -53.7 -53.7 66 -99 SPO 1997 10 25 01 31 101 6.9 -9 669.40 -54.2 -53.7 -53.7 66 -99 SPO 1997 10 25 01 32 99 6.9 -9 669.50 -54.2 -53.7 -53.7 66 -99 SPO 1997 10 25 01 33 101 6.9 -9 669.50 -54.2 -53.9 -53.7 64 -99 SPO 1997 10 25 01 34 102 6.8 -9 669.40 -54.4 -53.9 -53.7 65 -99 SPO 1997 10 25 01 35 102 6.9 -9 669.40 -54.2 -53.9 -53.7 63 -99 SPO 1997 10 25 01 36 102 6.8 -9 669.40 -54.2 -53.9 -53.7 63 -99 SPO 1997 10 25 01 37 103 6.7 -9 669.40 -54.4 -53.9 -53.7 65 -99 SPO 1997 10 25 01 38 105 7.1 -9 669.40 -54.4 -53.9 -53.9 65 -99 SPO 1997 10 25 01 39 105 7.3 -9 669.40 -54.2 -53.9 -53.9 62 -99 SPO 1997 10 25 01 40 104 7.1 -9 669.40 -54.4 -54.0 -53.9 65 -99 SPO 1997 10 25 01 41 105 7.2 -9 669.30 -54.4 -54.0 -53.9 63 -99 SPO 1997 10 25 01 42 106 7.3 -9 669.30 -54.4 -54.0 -53.9 65 -99 SPO 1997 10 25 01 43 106 6.9 -9 669.30 -54.4 -54.0 -53.9 65 -99 SPO 1997 10 25 01 44 105 6.8 -9 669.40 -54.4 -54.0 -53.9 63 -99 SPO 1997 10 25 01 45 107 6.5 -9 669.40 -54.5 -54.0 -54.0 64 -99 SPO 1997 10 25 01 46 104 6.0 -9 669.40 -54.5 -54.0 -54.0 63 -99 SPO 1997 10 25 01 47 101 5.3 -9 669.50 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 48 105 5.4 -9 669.50 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 49 107 5.1 -9 669.50 -54.5 -54.2 -53.9 62 -99 SPO 1997 10 25 01 50 99 4.5 -9 669.60 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 51 104 4.5 -9 669.60 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 52 104 4.7 -9 669.50 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 53 106 5.1 -9 669.50 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 54 106 5.2 -9 669.50 -54.5 -54.2 -53.7 62 -99 SPO 1997 10 25 01 55 102 5.2 -9 669.50 -54.5 -54.4 -53.7 62 -99 SPO 1997 10 25 01 56 104 5.0 -9 669.50 -54.5 -54.4 -53.7 62 -99 SPO 1997 10 25 01 57 104 5.2 -9 669.50 -54.7 -54.5 -53.9 63 -99 SPO 1997 10 25 01 58 105 5.2 -9 669.40 -54.7 -54.5 -53.9 63 -99 SPO 1997 10 25 01 59 107 5.5 -9 669.40 -54.7 -54.5 -54.0 63 -99 SPO 1997 10 25 02 00 106 5.7 -9 669.40 -54.7 -54.5 -54.0 63 0 SPO 1997 10 25 02 01 106 5.6 -9 669.40 -54.9 -54.5 -54.0 65 -99 SPO 1997 10 25 02 02 106 5.0 -9 669.40 -54.9 -54.5 -54.0 65 -99 SPO 1997 10 25 02 03 107 5.0 -9 669.40 -54.9 -54.5 -54.0 65 -99 SPO 1997 10 25 02 04 107 5.0 -9 669.40 -54.9 -54.5 -54.2 65 -99 SPO 1997 10 25 02 05 108 4.5 -9 669.40 -54.9 -54.7 -54.0 63 -99 SPO 1997 10 25 02 06 111 4.8 -9 669.40 -55.0 -54.7 -54.2 64 -99 SPO 1997 10 25 02 07 113 4.6 -9 669.40 -55.0 -54.7 -54.4 64 -99 SPO 1997 10 25 02 08 111 4.5 -9 669.40 -55.0 -54.7 -54.2 64 -99 SPO 1997 10 25 02 09 114 4.3 -9 669.40 -55.0 -54.7 -54.2 64 -99 SPO 1997 10 25 02 10 114 4.2 -9 669.40 -55.0 -54.7 -54.4 62 -99 SPO 1997 10 25 02 11 109 3.9 -9 669.50 -55.0 -54.7 -54.2 62 -99 SPO 1997 10 25 02 12 112 4.0 -9 669.40 -55.0 -54.9 -54.2 62 -99 SPO 1997 10 25 02 13 110 4.2 -9 669.40 -55.0 -54.9 -54.2 62 -99 SPO 1997 10 25 02 14 106 3.8 -9 669.50 -55.2 -54.9 -54.2 63 -99 SPO 1997 10 25 02 15 110 4.2 -9 669.40 -55.2 -55.0 -54.2 63 -99 SPO 1997 10 25 02 16 112 4.4 -9 669.40 -55.2 -54.9 -54.4 64 -99 SPO 1997 10 25 02 17 114 4.8 -9 669.30 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 02 18 114 4.7 -9 669.30 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 02 19 116 4.5 -9 669.30 -55.2 -54.9 -54.5 66 -99 SPO 1997 10 25 02 20 116 4.4 -9 669.40 -55.2 -54.9 -54.5 66 -99 SPO 1997 10 25 02 21 113 4.2 -9 669.40 -55.2 -54.9 -54.5 66 -99 SPO 1997 10 25 02 22 116 4.1 -9 669.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 02 23 115 3.9 -9 669.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 02 24 111 3.8 -9 669.40 -55.2 -54.9 -54.4 63 -99 SPO 1997 10 25 02 25 115 4.3 -9 669.40 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 02 26 113 4.3 -9 669.30 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 02 27 114 4.4 -9 669.30 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 02 28 111 4.4 -9 669.30 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 02 29 108 4.3 -9 669.30 -55.4 -55.0 -54.4 65 -99 SPO 1997 10 25 02 30 110 4.4 -9 669.30 -55.4 -55.0 -54.4 65 -99 SPO 1997 10 25 02 31 105 4.2 -9 669.30 -55.5 -55.0 -54.4 65 -99 SPO 1997 10 25 02 32 104 4.0 -9 669.30 -55.5 -55.0 -54.2 65 -99 SPO 1997 10 25 02 33 105 4.0 -9 669.30 -55.5 -55.0 -54.2 65 -99 SPO 1997 10 25 02 34 106 4.0 -9 669.20 -55.4 -55.0 -54.2 65 -99 SPO 1997 10 25 02 35 101 3.9 -9 669.20 -55.4 -55.0 -54.0 65 -99 SPO 1997 10 25 02 36 101 4.0 -9 669.30 -55.4 -55.0 -54.0 63 -99 SPO 1997 10 25 02 37 106 4.5 -9 669.20 -55.4 -55.0 -54.2 63 -99 SPO 1997 10 25 02 38 108 4.8 -9 669.10 -55.4 -55.0 -54.4 63 -99 SPO 1997 10 25 02 39 110 5.1 -9 669.10 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 02 40 108 5.0 -9 669.10 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 02 41 106 4.9 -9 669.10 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 42 106 4.8 -9 669.10 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 43 105 4.9 -9 669.10 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 44 104 4.9 -9 669.10 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 45 104 5.2 -9 669.00 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 46 103 5.2 -9 669.00 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 02 47 102 5.2 -9 669.00 -55.5 -55.2 -54.5 65 -99 SPO 1997 10 25 02 48 102 5.3 -9 669.00 -55.5 -55.2 -54.5 65 -99 SPO 1997 10 25 02 49 101 5.3 -9 669.00 -55.5 -55.2 -54.5 65 -99 SPO 1997 10 25 02 50 99 5.2 -9 669.00 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 02 51 99 5.3 -9 668.90 -55.7 -55.0 -54.5 65 -99 SPO 1997 10 25 02 52 99 5.5 -9 668.90 -55.7 -55.0 -54.5 65 -99 SPO 1997 10 25 02 53 94 5.2 -9 668.90 -55.7 -55.0 -54.7 65 -99 SPO 1997 10 25 02 54 90 5.2 -9 668.90 -55.7 -55.0 -54.5 65 -99 SPO 1997 10 25 02 55 91 5.2 -9 668.90 -55.5 -55.0 -54.7 64 -99 SPO 1997 10 25 02 56 93 5.3 -9 668.90 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 02 57 93 5.2 -9 668.90 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 02 58 90 4.8 -9 668.90 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 02 59 91 4.6 -9 668.90 -55.7 -55.0 -54.5 65 -99 SPO 1997 10 25 03 00 92 4.2 -9 668.90 -55.7 -55.0 -54.5 64 0 SPO 1997 10 25 03 01 90 4.1 -9 668.90 -55.7 -55.0 -54.4 64 -99 SPO 1997 10 25 03 02 89 3.7 -9 668.90 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 03 85 3.4 -9 668.90 -55.7 -55.2 -54.4 63 -99 SPO 1997 10 25 03 04 85 3.8 -9 668.90 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 05 88 3.9 -9 668.90 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 06 90 4.2 -9 668.80 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 07 92 4.2 -9 668.80 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 08 91 4.2 -9 668.80 -55.5 -55.2 -54.4 62 -99 SPO 1997 10 25 03 09 89 4.1 -9 668.80 -55.5 -55.2 -54.4 64 -99 SPO 1997 10 25 03 10 89 4.0 -9 668.80 -55.5 -55.2 -54.4 64 -99 SPO 1997 10 25 03 11 91 4.3 -9 668.80 -55.5 -55.2 -54.4 64 -99 SPO 1997 10 25 03 12 90 4.1 -9 668.80 -55.5 -55.2 -54.2 62 -99 SPO 1997 10 25 03 13 90 4.5 -9 668.80 -55.5 -55.2 -54.2 62 -99 SPO 1997 10 25 03 14 88 4.6 -9 668.80 -55.5 -55.0 -54.2 62 -99 SPO 1997 10 25 03 15 92 4.5 -9 668.80 -55.5 -55.2 -54.2 62 -99 SPO 1997 10 25 03 16 92 4.6 -9 668.80 -55.5 -55.2 -54.2 64 -99 SPO 1997 10 25 03 17 88 4.8 -9 668.80 -55.4 -55.2 -54.2 63 -99 SPO 1997 10 25 03 18 89 4.6 -9 668.80 -55.4 -55.2 -54.2 65 -99 SPO 1997 10 25 03 19 84 4.4 -9 668.80 -55.4 -55.2 -54.2 65 -99 SPO 1997 10 25 03 20 83 4.6 -9 668.80 -55.4 -55.2 -54.4 65 -99 SPO 1997 10 25 03 21 82 4.2 -9 668.80 -55.2 -55.2 -54.4 64 -99 SPO 1997 10 25 03 22 83 4.4 -9 668.80 -55.2 -55.2 -54.4 64 -99 SPO 1997 10 25 03 23 80 3.9 -9 668.80 -55.2 -55.2 -54.4 66 -99 SPO 1997 10 25 03 24 78 4.4 -9 668.80 -55.2 -55.2 -54.5 66 -99 SPO 1997 10 25 03 25 87 4.2 -9 668.80 -55.2 -55.2 -54.4 66 -99 SPO 1997 10 25 03 26 83 4.2 -9 668.80 -55.2 -55.2 -54.2 64 -99 SPO 1997 10 25 03 27 78 4.0 -9 668.80 -55.2 -55.2 -54.4 63 -99 SPO 1997 10 25 03 28 81 4.2 -9 668.80 -55.2 -55.2 -54.4 63 -99 SPO 1997 10 25 03 29 83 4.6 -9 668.80 -55.4 -55.2 -54.4 65 -99 SPO 1997 10 25 03 30 87 4.8 -9 668.70 -55.2 -55.2 -54.4 63 -99 SPO 1997 10 25 03 31 84 5.1 -9 668.70 -55.2 -55.2 -54.4 63 -99 SPO 1997 10 25 03 32 81 4.9 -9 668.70 -55.2 -55.2 -54.4 63 -99 SPO 1997 10 25 03 33 80 5.1 -9 668.70 -55.4 -55.2 -54.5 65 -99 SPO 1997 10 25 03 34 79 4.6 -9 668.70 -55.2 -55.2 -54.5 63 -99 SPO 1997 10 25 03 35 78 4.6 -9 668.70 -55.2 -55.2 -54.5 64 -99 SPO 1997 10 25 03 36 72 4.3 -9 668.70 -55.2 -55.2 -54.5 64 -99 SPO 1997 10 25 03 37 67 4.2 -9 668.70 -55.2 -55.2 -54.7 64 -99 SPO 1997 10 25 03 38 61 4.0 -9 668.80 -55.2 -55.2 -54.5 63 -99 SPO 1997 10 25 03 39 67 4.0 -9 668.80 -55.4 -55.2 -54.5 65 -99 SPO 1997 10 25 03 40 74 4.6 -9 668.70 -55.2 -55.2 -54.7 63 -99 SPO 1997 10 25 03 41 73 4.9 -9 668.70 -55.2 -55.2 -54.7 63 -99 SPO 1997 10 25 03 42 78 5.0 -9 668.60 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 03 43 76 5.4 -9 668.60 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 03 44 72 5.2 -9 668.60 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 03 45 76 5.6 -9 668.60 -55.0 -55.0 -54.7 62 -99 SPO 1997 10 25 03 46 74 5.6 -9 668.60 -55.0 -54.9 -54.7 64 -99 SPO 1997 10 25 03 47 75 5.7 -9 668.60 -55.0 -55.0 -54.7 64 -99 SPO 1997 10 25 03 48 78 5.9 -9 668.60 -55.0 -54.9 -54.5 64 -99 SPO 1997 10 25 03 49 78 5.9 -9 668.50 -55.0 -54.9 -54.5 64 -99 SPO 1997 10 25 03 50 81 5.8 -9 668.50 -55.0 -54.9 -54.5 64 -99 SPO 1997 10 25 03 51 78 5.8 -9 668.50 -55.0 -54.9 -54.5 64 -99 SPO 1997 10 25 03 52 76 5.7 -9 668.50 -55.0 -54.9 -54.5 64 -99 SPO 1997 10 25 03 53 80 5.7 -9 668.50 -55.0 -55.0 -54.7 62 -99 SPO 1997 10 25 03 54 74 5.8 -9 668.50 -55.0 -55.0 -54.7 62 -99 SPO 1997 10 25 03 55 74 5.4 -9 668.50 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 03 56 74 5.4 -9 668.50 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 03 57 72 5.3 -9 668.50 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 03 58 71 5.5 -9 668.50 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 03 59 77 5.3 -9 668.40 -55.2 -55.0 -54.7 64 -99 SPO 1997 10 25 04 00 73 5.2 -9 668.50 -55.2 -55.0 -54.7 63 0 SPO 1997 10 25 04 01 71 5.0 -9 668.50 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 02 68 4.9 -9 668.50 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 03 69 4.9 -9 668.50 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 04 69 5.4 -9 668.50 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 05 73 5.1 -9 668.50 -55.4 -55.0 -54.7 63 -99 SPO 1997 10 25 04 06 73 5.5 -9 668.40 -55.4 -55.0 -54.7 63 -99 SPO 1997 10 25 04 07 74 5.6 -9 668.40 -55.4 -55.0 -54.7 62 -99 SPO 1997 10 25 04 08 75 5.5 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 09 74 5.2 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 10 73 5.3 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 11 75 5.3 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 12 75 5.3 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 13 76 5.4 -9 668.40 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 14 76 5.4 -9 668.40 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 15 79 5.5 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 16 79 5.2 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 17 77 5.2 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 18 80 5.2 -9 668.40 -55.2 -55.0 -54.7 62 -99 SPO 1997 10 25 04 19 81 5.2 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 20 82 5.1 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 21 81 4.8 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 22 81 5.0 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 23 81 4.6 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 24 79 4.4 -9 668.50 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 25 77 3.9 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 26 76 3.9 -9 668.50 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 27 76 3.8 -9 668.50 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 28 76 3.7 -9 668.50 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 29 72 3.8 -9 668.50 -55.4 -55.0 -54.5 62 -99 SPO 1997 10 25 04 30 75 3.9 -9 668.50 -55.2 -55.0 -54.5 59 -99 SPO 1997 10 25 04 31 78 4.1 -9 668.50 -55.2 -55.0 -54.5 59 -99 SPO 1997 10 25 04 32 76 4.0 -9 668.50 -55.2 -55.0 -54.5 59 -99 SPO 1997 10 25 04 33 77 4.2 -9 668.40 -55.2 -55.0 -54.5 60 -99 SPO 1997 10 25 04 34 79 4.4 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 35 81 4.5 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 36 83 5.0 -9 668.40 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 37 82 4.8 -9 668.40 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 04 38 84 5.0 -9 668.40 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 39 83 5.0 -9 668.30 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 40 83 5.0 -9 668.30 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 41 83 4.9 -9 668.30 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 42 78 4.6 -9 668.40 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 43 78 4.3 -9 668.40 -55.2 -55.0 -54.7 63 -99 SPO 1997 10 25 04 44 77 4.1 -9 668.40 -55.4 -55.0 -54.7 63 -99 SPO 1997 10 25 04 45 75 3.8 -9 668.40 -55.4 -55.0 -54.7 63 -99 SPO 1997 10 25 04 46 77 3.8 -9 668.40 -55.4 -55.0 -54.7 63 -99 SPO 1997 10 25 04 47 80 3.7 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 48 79 3.7 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 04 49 77 3.4 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 50 80 3.5 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 51 84 3.8 -9 668.40 -55.4 -55.0 -54.4 63 -99 SPO 1997 10 25 04 52 81 3.8 -9 668.40 -55.4 -55.0 -54.4 65 -99 SPO 1997 10 25 04 53 81 3.9 -9 668.40 -55.4 -55.0 -54.4 65 -99 SPO 1997 10 25 04 54 83 4.0 -9 668.40 -55.5 -55.0 -54.5 65 -99 SPO 1997 10 25 04 55 83 4.2 -9 668.40 -55.4 -55.0 -54.5 65 -99 SPO 1997 10 25 04 56 84 4.4 -9 668.40 -55.4 -55.0 -54.5 63 -99 SPO 1997 10 25 04 57 85 4.5 -9 668.40 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 04 58 83 4.3 -9 668.40 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 04 59 80 4.2 -9 668.40 -55.5 -55.0 -54.5 64 -99 SPO 1997 10 25 05 00 81 4.2 -9 668.40 -55.5 -55.0 -54.7 64 0 SPO 1997 10 25 05 01 84 4.5 -9 668.40 -55.5 -54.9 -54.5 64 -99 SPO 1997 10 25 05 02 82 4.5 -9 668.40 -55.5 -54.9 -54.5 64 -99 SPO 1997 10 25 05 03 81 4.5 -9 668.40 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 04 82 4.7 -9 668.40 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 05 84 4.8 -9 668.40 -55.5 -54.9 -54.7 65 -99 SPO 1997 10 25 05 06 85 5.1 -9 668.40 -55.5 -54.9 -54.7 65 -99 SPO 1997 10 25 05 07 85 5.2 -9 668.40 -55.5 -54.9 -54.7 65 -99 SPO 1997 10 25 05 08 87 5.3 -9 668.40 -55.5 -54.9 -54.7 65 -99 SPO 1997 10 25 05 09 87 5.0 -9 668.40 -55.5 -54.7 -54.7 65 -99 SPO 1997 10 25 05 10 87 4.7 -9 668.40 -55.5 -54.7 -54.7 64 -99 SPO 1997 10 25 05 11 88 4.4 -9 668.40 -55.5 -54.7 -54.7 64 -99 SPO 1997 10 25 05 12 89 4.3 -9 668.40 -55.5 -54.7 -54.5 62 -99 SPO 1997 10 25 05 13 89 4.2 -9 668.40 -55.5 -54.7 -54.5 62 -99 SPO 1997 10 25 05 14 91 4.1 -9 668.40 -55.5 -54.7 -54.5 64 -99 SPO 1997 10 25 05 15 90 4.0 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 16 90 3.8 -9 668.50 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 17 92 4.1 -9 668.50 -55.4 -54.7 -54.5 63 -99 SPO 1997 10 25 05 18 92 4.3 -9 668.40 -55.4 -54.7 -54.5 63 -99 SPO 1997 10 25 05 19 92 4.2 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 20 92 4.4 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 21 92 4.4 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 22 92 4.5 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 23 93 4.7 -9 668.40 -55.4 -54.9 -54.5 63 -99 SPO 1997 10 25 05 24 94 4.9 -9 668.40 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 25 93 4.9 -9 668.40 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 26 94 5.0 -9 668.40 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 27 92 4.8 -9 668.30 -55.5 -54.9 -54.7 64 -99 SPO 1997 10 25 05 28 91 4.8 -9 668.40 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 29 91 4.9 -9 668.40 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 30 90 4.8 -9 668.30 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 31 91 5.0 -9 668.30 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 32 91 5.2 -9 668.30 -55.5 -54.9 -54.7 65 -99 SPO 1997 10 25 05 33 89 4.9 -9 668.30 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 34 89 5.0 -9 668.30 -55.4 -54.9 -54.7 65 -99 SPO 1997 10 25 05 35 88 4.6 -9 668.30 -55.2 -54.9 -54.7 63 -99 SPO 1997 10 25 05 36 87 4.5 -9 668.30 -55.2 -54.9 -54.5 63 -99 SPO 1997 10 25 05 37 88 4.5 -9 668.30 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 05 38 89 4.5 -9 668.30 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 05 39 88 4.4 -9 668.30 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 05 40 86 4.3 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 05 41 86 4.4 -9 668.40 -55.2 -55.0 -54.5 62 -99 SPO 1997 10 25 05 42 86 4.6 -9 668.40 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 05 43 87 4.5 -9 668.40 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 05 44 86 4.4 -9 668.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 05 45 86 4.6 -9 668.40 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 05 46 88 4.8 -9 668.40 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 05 47 88 4.8 -9 668.40 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 05 48 88 4.6 -9 668.40 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 05 49 90 4.6 -9 668.40 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 05 50 92 4.8 -9 668.40 -55.2 -54.9 -54.5 63 -99 SPO 1997 10 25 05 51 90 4.9 -9 668.40 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 05 52 89 4.8 -9 668.40 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 05 53 87 4.2 -9 668.40 -55.2 -54.9 -54.5 63 -99 SPO 1997 10 25 05 54 85 4.3 -9 668.40 -55.2 -54.9 -54.5 63 -99 SPO 1997 10 25 05 55 87 4.3 -9 668.40 -55.2 -55.0 -54.5 63 -99 SPO 1997 10 25 05 56 86 4.7 -9 668.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 05 57 87 5.0 -9 668.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 05 58 85 4.8 -9 668.40 -55.2 -55.0 -54.5 64 -99 SPO 1997 10 25 05 59 83 4.8 -9 668.40 -55.2 -54.9 -54.5 64 -99 SPO 1997 10 25 06 00 82 5.1 -9 668.40 -55.2 -54.9 -54.5 64 0 SPO 1997 10 25 06 01 82 5.4 -9 668.40 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 02 84 5.7 -9 668.40 -55.2 -54.7 -54.5 66 -99 SPO 1997 10 25 06 03 83 5.7 -9 668.30 -55.2 -54.7 -54.5 66 -99 SPO 1997 10 25 06 04 82 5.8 -9 668.30 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 05 82 5.7 -9 668.30 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 06 06 83 5.8 -9 668.30 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 06 07 83 6.0 -9 668.30 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 08 84 5.8 -9 668.30 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 09 84 5.8 -9 668.30 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 10 85 5.8 -9 668.30 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 11 84 5.7 -9 668.30 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 06 12 83 5.7 -9 668.30 -55.0 -54.7 -54.5 62 -99 SPO 1997 10 25 06 13 83 5.4 -9 668.30 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 14 84 5.7 -9 668.30 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 15 84 5.6 -9 668.30 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 16 83 5.4 -9 668.30 -55.2 -54.7 -54.5 64 -99 SPO 1997 10 25 06 17 81 5.2 -9 668.30 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 06 18 81 5.2 -9 668.40 -55.2 -54.7 -54.5 63 -99 SPO 1997 10 25 06 19 81 5.1 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 20 82 5.1 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 21 81 5.1 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 22 81 5.0 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 23 82 5.2 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 24 82 5.1 -9 668.40 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 25 83 5.2 -9 668.30 -55.2 -54.7 -54.4 63 -99 SPO 1997 10 25 06 26 84 4.8 -9 668.30 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 06 27 83 5.0 -9 668.30 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 06 28 82 5.0 -9 668.30 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 06 29 81 5.3 -9 668.30 -55.2 -54.7 -54.4 62 -99 SPO 1997 10 25 06 30 81 5.3 -9 668.30 -55.2 -54.7 -54.4 62 -99 SPO 1997 10 25 06 31 83 5.4 -9 668.30 -55.2 -54.7 -54.4 62 -99 SPO 1997 10 25 06 32 84 5.9 -9 668.20 -55.2 -54.5 -54.4 62 -99 SPO 1997 10 25 06 33 83 6.1 -9 668.20 -55.2 -54.5 -54.4 62 -99 SPO 1997 10 25 06 34 82 5.8 -9 668.20 -55.2 -54.5 -54.4 63 -99 SPO 1997 10 25 06 35 82 5.9 -9 668.20 -55.2 -54.5 -54.4 63 -99 SPO 1997 10 25 06 36 82 5.8 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 37 83 5.9 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 38 82 5.7 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 39 81 5.8 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 40 80 5.7 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 41 80 5.6 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 42 80 5.6 -9 668.20 -55.0 -54.5 -54.4 62 -99 SPO 1997 10 25 06 43 81 5.6 -9 668.20 -55.0 -54.5 -54.4 60 -99 SPO 1997 10 25 06 44 79 5.8 -9 668.20 -55.0 -54.5 -54.5 60 -99 SPO 1997 10 25 06 45 79 5.8 -9 668.20 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 46 79 6.1 -9 668.10 -55.2 -54.5 -54.5 62 -99 SPO 1997 10 25 06 47 78 6.1 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 48 78 6.4 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 49 78 6.3 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 06 50 79 6.4 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 51 79 6.4 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 52 78 6.3 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 53 79 6.3 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 54 79 6.2 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 55 79 6.1 -9 668.10 -55.0 -54.4 -54.5 62 -99 SPO 1997 10 25 06 56 78 5.9 -9 668.10 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 06 57 78 6.0 -9 668.20 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 06 58 79 6.0 -9 668.10 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 06 59 79 6.0 -9 668.10 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 07 00 79 6.1 -9 668.10 -55.2 -54.5 -54.5 63 0 SPO 1997 10 25 07 01 78 6.2 -9 668.10 -55.0 -54.5 -54.5 62 -99 SPO 1997 10 25 07 02 80 6.3 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 03 80 6.3 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 04 81 6.4 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 05 82 6.5 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 06 83 6.2 -9 668.10 -55.2 -54.4 -54.5 63 -99 SPO 1997 10 25 07 07 83 6.2 -9 668.10 -55.2 -54.4 -54.5 63 -99 SPO 1997 10 25 07 08 84 6.2 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 09 85 5.9 -9 668.10 -55.2 -54.5 -54.5 63 -99 SPO 1997 10 25 07 10 86 5.9 -9 668.10 -55.2 -54.5 -54.5 62 -99 SPO 1997 10 25 07 11 86 5.5 -9 668.10 -55.2 -54.5 -54.5 62 -99 SPO 1997 10 25 07 12 88 5.6 -9 668.10 -55.2 -54.5 -54.5 62 -99 SPO 1997 10 25 07 13 89 5.6 -9 668.10 -55.2 -54.5 -54.5 62 -99 SPO 1997 10 25 07 14 89 5.6 -9 668.20 -55.4 -54.7 -54.5 63 -99 SPO 1997 10 25 07 15 89 5.4 -9 668.10 -55.4 -54.5 -54.4 63 -99 SPO 1997 10 25 07 16 89 5.2 -9 668.20 -55.4 -54.7 -54.4 63 -99 SPO 1997 10 25 07 17 88 5.2 -9 668.20 -55.4 -54.7 -54.4 63 -99 SPO 1997 10 25 07 18 89 5.2 -9 668.20 -55.2 -54.7 -54.4 62 -99 SPO 1997 10 25 07 19 88 5.1 -9 668.20 -55.4 -54.7 -54.2 63 -99 SPO 1997 10 25 07 20 87 5.0 -9 668.20 -55.4 -54.7 -54.2 63 -99 SPO 1997 10 25 07 21 85 5.0 -9 668.20 -55.4 -54.7 -54.2 63 -99 SPO 1997 10 25 07 22 84 5.1 -9 668.20 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 07 23 83 5.0 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 07 24 82 5.0 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 07 25 82 4.8 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 07 26 82 4.9 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 07 27 81 5.0 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 07 28 80 5.0 -9 668.20 -55.0 -54.5 -54.2 62 -99 SPO 1997 10 25 07 29 80 5.0 -9 668.20 -55.0 -54.5 -54.2 62 -99 SPO 1997 10 25 07 30 79 4.9 -9 668.20 -55.0 -54.5 -54.2 62 -99 SPO 1997 10 25 07 31 79 4.8 -9 668.20 -55.0 -54.5 -54.2 62 -99 SPO 1997 10 25 07 32 81 4.7 -9 668.20 -55.0 -54.5 -54.2 62 -99 SPO 1997 10 25 07 33 80 4.7 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 34 81 4.6 -9 668.20 -55.0 -54.7 -54.0 62 -99 SPO 1997 10 25 07 35 81 4.6 -9 668.20 -55.0 -54.7 -54.0 62 -99 SPO 1997 10 25 07 36 82 4.6 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 37 82 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 38 84 4.7 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 39 84 4.9 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 40 84 4.9 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 41 84 4.7 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 42 86 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 43 85 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 44 85 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 45 85 5.0 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 46 84 5.0 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 07 47 83 4.9 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 48 84 4.9 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 49 85 4.9 -9 668.20 -55.0 -54.5 -54.0 62 -99 SPO 1997 10 25 07 50 83 4.7 -9 668.20 -55.2 -54.7 -54.0 63 -99 SPO 1997 10 25 07 51 84 4.9 -9 668.20 -55.2 -54.7 -54.0 63 -99 SPO 1997 10 25 07 52 85 4.8 -9 668.10 -55.2 -54.7 -54.0 63 -99 SPO 1997 10 25 07 53 84 4.9 -9 668.10 -55.2 -54.7 -54.2 63 -99 SPO 1997 10 25 07 54 84 5.1 -9 668.10 -55.2 -54.7 -54.2 63 -99 SPO 1997 10 25 07 55 84 5.2 -9 668.10 -55.4 -54.7 -54.2 65 -99 SPO 1997 10 25 07 56 82 5.1 -9 668.10 -55.2 -54.7 -54.2 63 -99 SPO 1997 10 25 07 57 83 5.0 -9 668.10 -55.2 -54.7 -54.2 63 -99 SPO 1997 10 25 07 58 83 5.1 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 07 59 81 4.9 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 00 83 5.0 -9 668.20 -55.2 -54.7 -54.2 63 0 SPO 1997 10 25 08 01 83 5.0 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 02 83 5.0 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 03 84 5.1 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 04 84 5.2 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 05 84 5.0 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 06 85 5.2 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 07 85 5.2 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 08 84 5.0 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 09 86 5.0 -9 668.10 -55.2 -54.7 -54.2 62 -99 SPO 1997 10 25 08 10 87 5.0 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 11 86 4.7 -9 668.10 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 12 87 4.5 -9 668.10 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 13 87 4.5 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 14 88 4.3 -9 668.20 -55.2 -54.5 -54.0 62 -99 SPO 1997 10 25 08 15 87 4.4 -9 668.20 -55.2 -54.7 -53.9 62 -99 SPO 1997 10 25 08 16 88 4.3 -9 668.20 -55.2 -54.7 -53.9 62 -99 SPO 1997 10 25 08 17 88 4.2 -9 668.20 -55.2 -54.5 -53.9 62 -99 SPO 1997 10 25 08 18 90 4.5 -9 668.20 -55.2 -54.5 -53.9 62 -99 SPO 1997 10 25 08 19 90 4.5 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 20 90 4.5 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 21 89 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 22 89 4.8 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 23 89 5.1 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 24 90 5.2 -9 668.20 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 25 88 5.3 -9 668.10 -55.2 -54.5 -54.0 63 -99 SPO 1997 10 25 08 26 88 5.5 -9 668.10 -55.2 -54.5 -54.2 64 -99 SPO 1997 10 25 08 27 87 5.4 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 28 87 5.3 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 29 87 5.4 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 30 87 5.5 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 31 86 5.4 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 32 87 5.4 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 33 86 5.3 -9 668.10 -55.2 -54.4 -54.2 63 -99 SPO 1997 10 25 08 34 85 5.1 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 35 87 5.1 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 36 87 5.2 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 37 86 5.0 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 38 86 5.0 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 39 86 5.1 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 40 84 5.2 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 41 84 5.2 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 42 84 5.4 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 43 84 5.5 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 44 85 5.5 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 45 85 5.7 -9 668.10 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 46 86 5.5 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 47 87 5.6 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 48 87 5.5 -9 668.10 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 49 88 5.3 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 50 88 5.2 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 51 88 5.1 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 52 89 5.1 -9 668.20 -55.2 -54.5 -54.2 63 -99 SPO 1997 10 25 08 53 90 5.3 -9 668.20 -55.2 -54.4 -54.2 63 -99 SPO 1997 10 25 08 54 91 5.4 -9 668.20 -55.2 -54.4 -54.2 63 -99 SPO 1997 10 25 08 55 91 5.3 -9 668.20 -55.2 -54.4 -54.2 62 -99 SPO 1997 10 25 08 56 92 5.4 -9 668.20 -55.2 -54.4 -54.2 62 -99 SPO 1997 10 25 08 57 92 5.4 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 58 92 5.4 -9 668.20 -55.2 -54.5 -54.2 62 -99 SPO 1997 10 25 08 59 90 5.5 -9 668.10 -55.4 -54.5 -54.2 63 -99 SPO 1997 10 25 09 00 89 5.5 -9 668.10 -55.4 -54.5 -54.2 63 0 SPO 1997 10 25 09 01 89 5.6 -9 668.10 -55.4 -54.5 -54.4 63 -99 SPO 1997 10 25 09 02 87 5.6 -9 668.10 -55.4 -54.5 -54.4 63 -99 SPO 1997 10 25 09 03 85 5.7 -9 668.10 -55.5 -54.5 -54.4 64 -99 SPO 1997 10 25 09 04 85 5.7 -9 668.10 -55.5 -54.5 -54.5 64 -99 SPO 1997 10 25 09 05 84 5.7 -9 668.10 -55.5 -54.4 -54.5 64 -99 SPO 1997 10 25 09 06 84 5.7 -9 668.10 -55.4 -54.4 -54.5 63 -99 SPO 1997 10 25 09 07 84 5.9 -9 668.10 -55.4 -54.2 -54.5 63 -99 SPO 1997 10 25 09 08 84 6.0 -9 668.10 -55.2 -54.2 -54.5 62 -99 SPO 1997 10 25 09 09 84 5.8 -9 668.10 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 10 83 5.7 -9 668.10 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 11 83 5.7 -9 668.10 -55.2 -54.2 -54.5 62 -99 SPO 1997 10 25 09 12 84 5.8 -9 668.10 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 13 84 5.8 -9 668.10 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 14 85 5.8 -9 668.10 -55.2 -54.2 -54.4 63 -99 SPO 1997 10 25 09 15 85 5.7 -9 668.10 -55.2 -54.2 -54.4 63 -99 SPO 1997 10 25 09 16 86 5.7 -9 668.10 -55.2 -54.4 -54.4 63 -99 SPO 1997 10 25 09 17 86 5.5 -9 668.10 -55.2 -54.4 -54.4 63 -99 SPO 1997 10 25 09 18 87 5.4 -9 668.10 -55.2 -54.4 -54.4 63 -99 SPO 1997 10 25 09 19 88 5.3 -9 668.10 -55.2 -54.5 -54.4 62 -99 SPO 1997 10 25 09 20 88 5.3 -9 668.20 -55.4 -54.5 -54.4 63 -99 SPO 1997 10 25 09 21 88 5.0 -9 668.20 -55.4 -54.5 -54.2 63 -99 SPO 1997 10 25 09 22 87 5.1 -9 668.20 -55.4 -54.5 -54.4 63 -99 SPO 1997 10 25 09 23 87 5.2 -9 668.20 -55.4 -54.4 -54.4 63 -99 SPO 1997 10 25 09 24 87 4.9 -9 668.20 -55.4 -54.4 -54.4 63 -99 SPO 1997 10 25 09 25 86 5.2 -9 668.20 -55.4 -54.4 -54.4 63 -99 SPO 1997 10 25 09 26 86 5.2 -9 668.20 -55.4 -54.2 -54.4 63 -99 SPO 1997 10 25 09 27 86 5.4 -9 668.20 -55.4 -54.2 -54.4 63 -99 SPO 1997 10 25 09 28 86 5.3 -9 668.20 -55.4 -54.2 -54.4 63 -99 SPO 1997 10 25 09 29 86 5.5 -9 668.20 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 30 87 5.4 -9 668.20 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 09 31 87 5.5 -9 668.20 -55.2 -54.2 -54.2 62 -99 SPO 1997 10 25 09 32 87 5.4 -9 668.20 -55.2 -54.2 -54.2 62 -99 SPO 1997 10 25 09 33 87 5.4 -9 668.20 -55.2 -54.2 -54.2 62 -99 SPO 1997 10 25 09 34 87 5.3 -9 668.20 -55.2 -54.2 -54.2 62 -99 SPO 1997 10 25 09 35 87 5.3 -9 668.20 -55.2 -54.2 -54.2 63 -99 SPO 1997 10 25 09 36 87 5.2 -9 668.20 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 09 37 86 5.2 -9 668.30 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 09 38 87 5.0 -9 668.30 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 09 39 87 5.0 -9 668.30 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 09 40 88 5.1 -9 668.30 -55.4 -54.2 -54.2 63 -99 SPO 1997 10 25 09 41 87 5.0 -9 668.30 -55.4 -54.2 -54.2 63 -99 SPO 1997 10 25 09 42 86 4.9 -9 668.30 -55.4 -54.2 -54.2 63 -99 SPO 1997 10 25 09 43 87 4.9 -9 668.30 -55.4 -54.2 -54.2 63 -99 SPO 1997 10 25 09 44 87 4.9 -9 668.30 -55.4 -54.2 -54.2 63 -99 SPO 1997 10 25 09 45 88 4.8 -9 668.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 09 46 89 4.7 -9 668.30 -55.5 -54.2 -54.2 62 -99 SPO 1997 10 25 09 47 88 4.6 -9 668.30 -55.4 -54.2 -54.2 62 -99 SPO 1997 10 25 09 48 89 4.8 -9 668.30 -55.5 -54.2 -54.2 62 -99 SPO 1997 10 25 09 49 89 4.8 -9 668.30 -55.5 -54.2 -54.2 62 -99 SPO 1997 10 25 09 50 90 4.8 -9 668.30 -55.5 -54.2 -54.2 62 -99 SPO 1997 10 25 09 51 91 4.8 -9 668.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 09 52 91 4.8 -9 668.30 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 09 53 91 4.7 -9 668.40 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 09 54 91 4.6 -9 668.40 -55.5 -54.2 -54.4 62 -99 SPO 1997 10 25 09 55 91 4.6 -9 668.40 -55.7 -54.2 -54.4 64 -99 SPO 1997 10 25 09 56 91 4.5 -9 668.40 -55.7 -54.2 -54.4 63 -99 SPO 1997 10 25 09 57 91 4.6 -9 668.40 -55.5 -54.0 -54.2 62 -99 SPO 1997 10 25 09 58 91 4.7 -9 668.40 -55.7 -54.0 -54.4 61 -99 SPO 1997 10 25 09 59 92 4.8 -9 668.30 -55.7 -54.0 -54.4 61 -99 SPO 1997 10 25 10 00 92 4.9 -9 668.30 -55.7 -54.0 -54.4 61 0 SPO 1997 10 25 10 01 91 4.7 -9 668.40 -55.7 -53.9 -54.4 61 -99 SPO 1997 10 25 10 02 91 4.7 -9 668.40 -55.7 -53.9 -54.2 63 -99 SPO 1997 10 25 10 03 91 4.8 -9 668.40 -55.5 -53.7 -54.2 62 -99 SPO 1997 10 25 10 04 91 5.0 -9 668.30 -55.5 -53.7 -54.2 62 -99 SPO 1997 10 25 10 05 92 5.1 -9 668.30 -55.5 -53.7 -54.2 62 -99 SPO 1997 10 25 10 06 91 5.2 -9 668.30 -55.5 -53.9 -54.2 62 -99 SPO 1997 10 25 10 07 92 5.2 -9 668.30 -55.5 -53.9 -54.2 62 -99 SPO 1997 10 25 10 08 92 5.3 -9 668.30 -55.5 -53.9 -54.2 64 -99 SPO 1997 10 25 10 09 92 5.3 -9 668.30 -55.5 -54.0 -54.2 64 -99 SPO 1997 10 25 10 10 92 5.4 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 11 91 5.4 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 12 90 5.5 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 13 89 5.4 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 14 89 5.5 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 15 89 5.4 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 16 88 5.3 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 17 88 5.2 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 18 89 5.2 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 19 90 5.2 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 20 91 5.0 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 21 92 5.0 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 22 93 4.9 -9 668.30 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 23 94 4.6 -9 668.40 -55.5 -54.0 -54.4 64 -99 SPO 1997 10 25 10 24 95 4.5 -9 668.40 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 10 25 96 4.4 -9 668.40 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 10 26 96 4.4 -9 668.40 -55.5 -54.2 -54.4 62 -99 SPO 1997 10 25 10 27 96 4.4 -9 668.40 -55.5 -54.2 -54.4 62 -99 SPO 1997 10 25 10 28 95 4.5 -9 668.40 -55.7 -54.2 -54.4 64 -99 SPO 1997 10 25 10 29 95 4.7 -9 668.40 -55.5 -54.2 -54.4 62 -99 SPO 1997 10 25 10 30 93 4.8 -9 668.30 -55.7 -54.4 -54.4 64 -99 SPO 1997 10 25 10 31 92 4.9 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 32 91 4.9 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 33 90 4.9 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 34 90 4.9 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 35 90 4.9 -9 668.30 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 10 36 90 5.0 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 37 90 5.2 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 38 91 5.1 -9 668.30 -55.7 -54.2 -54.7 63 -99 SPO 1997 10 25 10 39 90 5.1 -9 668.30 -55.7 -54.2 -54.5 63 -99 SPO 1997 10 25 10 40 90 4.9 -9 668.30 -55.7 -54.2 -54.5 63 -99 SPO 1997 10 25 10 41 90 4.8 -9 668.30 -55.7 -54.2 -54.5 63 -99 SPO 1997 10 25 10 42 91 4.7 -9 668.30 -55.7 -54.2 -54.5 63 -99 SPO 1997 10 25 10 43 91 4.8 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 44 91 4.8 -9 668.30 -55.7 -54.2 -54.5 64 -99 SPO 1997 10 25 10 45 91 4.8 -9 668.30 -55.5 -54.0 -54.5 64 -99 SPO 1997 10 25 10 46 90 4.9 -9 668.30 -55.5 -54.0 -54.5 64 -99 SPO 1997 10 25 10 47 89 4.8 -9 668.30 -55.5 -54.2 -54.5 64 -99 SPO 1997 10 25 10 48 88 4.8 -9 668.30 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 10 49 88 4.8 -9 668.30 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 10 50 88 5.0 -9 668.30 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 10 51 88 5.0 -9 668.30 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 10 52 87 5.2 -9 668.30 -55.5 -54.0 -54.5 64 -99 SPO 1997 10 25 10 53 86 5.2 -9 668.30 -55.5 -54.0 -54.5 64 -99 SPO 1997 10 25 10 54 85 5.4 -9 668.30 -55.5 -54.0 -54.5 64 -99 SPO 1997 10 25 10 55 85 5.4 -9 668.30 -55.5 -54.0 -54.5 65 -99 SPO 1997 10 25 10 56 85 5.5 -9 668.30 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 10 57 85 5.5 -9 668.30 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 10 58 85 5.5 -9 668.30 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 10 59 84 5.5 -9 668.30 -55.4 -53.9 -54.4 65 -99 SPO 1997 10 25 11 00 84 5.3 -9 668.30 -55.2 -54.0 -54.4 64 0 SPO 1997 10 25 11 01 83 5.2 -9 668.30 -55.2 -54.0 -54.5 64 -99 SPO 1997 10 25 11 02 84 5.2 -9 668.30 -55.2 -54.0 -54.4 64 -99 SPO 1997 10 25 11 03 84 5.2 -9 668.30 -55.2 -54.0 -54.4 64 -99 SPO 1997 10 25 11 04 85 5.2 -9 668.30 -55.2 -54.0 -54.4 64 -99 SPO 1997 10 25 11 05 85 5.0 -9 668.30 -55.2 -54.0 -54.4 63 -99 SPO 1997 10 25 11 06 86 5.0 -9 668.30 -55.2 -54.0 -54.4 63 -99 SPO 1997 10 25 11 07 87 4.9 -9 668.30 -55.2 -54.0 -54.4 63 -99 SPO 1997 10 25 11 08 88 4.9 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 09 88 4.8 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 10 88 4.7 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 11 89 4.7 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 12 89 4.5 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 13 90 4.5 -9 668.30 -55.2 -54.0 -54.2 63 -99 SPO 1997 10 25 11 14 89 4.5 -9 668.30 -55.2 -54.0 -54.2 64 -99 SPO 1997 10 25 11 15 90 4.5 -9 668.30 -55.2 -54.0 -54.0 64 -99 SPO 1997 10 25 11 16 90 4.4 -9 668.30 -55.2 -54.0 -54.0 64 -99 SPO 1997 10 25 11 17 90 4.4 -9 668.40 -55.2 -54.0 -54.0 64 -99 SPO 1997 10 25 11 18 90 4.4 -9 668.40 -55.2 -54.0 -54.0 64 -99 SPO 1997 10 25 11 19 90 4.5 -9 668.40 -55.2 -54.0 -54.0 63 -99 SPO 1997 10 25 11 20 91 4.6 -9 668.40 -55.2 -54.0 -54.0 64 -99 SPO 1997 10 25 11 21 92 4.6 -9 668.40 -55.2 -54.0 -54.2 64 -99 SPO 1997 10 25 11 22 94 4.8 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 23 94 4.9 -9 668.40 -55.2 -53.9 -54.2 66 -99 SPO 1997 10 25 11 24 94 5.0 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 25 93 5.1 -9 668.40 -55.2 -53.7 -54.2 64 -99 SPO 1997 10 25 11 26 94 5.2 -9 668.40 -55.2 -53.9 -54.2 63 -99 SPO 1997 10 25 11 27 94 5.2 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 28 94 5.2 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 29 95 5.3 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 30 96 5.2 -9 668.40 -55.2 -53.9 -54.2 63 -99 SPO 1997 10 25 11 31 96 5.1 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 32 97 5.0 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 33 97 5.0 -9 668.40 -55.2 -53.9 -54.2 63 -99 SPO 1997 10 25 11 34 97 5.0 -9 668.40 -55.2 -53.9 -54.2 64 -99 SPO 1997 10 25 11 35 97 5.1 -9 668.40 -55.2 -53.7 -54.2 66 -99 SPO 1997 10 25 11 36 96 5.0 -9 668.40 -55.0 -53.7 -54.2 64 -99 SPO 1997 10 25 11 37 95 4.9 -9 668.40 -55.0 -53.7 -54.0 64 -99 SPO 1997 10 25 11 38 95 4.9 -9 668.50 -55.0 -53.7 -54.2 66 -99 SPO 1997 10 25 11 39 94 5.1 -9 668.50 -55.0 -53.7 -54.0 66 -99 SPO 1997 10 25 11 40 94 5.0 -9 668.50 -55.0 -53.7 -54.2 66 -99 SPO 1997 10 25 11 41 93 5.0 -9 668.50 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 25 11 42 93 5.0 -9 668.50 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 25 11 43 94 4.9 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 11 44 95 4.8 -9 668.50 -55.2 -54.0 -54.2 66 -99 SPO 1997 10 25 11 45 96 4.7 -9 668.50 -55.2 -54.0 -54.2 66 -99 SPO 1997 10 25 11 46 96 4.4 -9 668.60 -55.2 -54.0 -54.2 64 -99 SPO 1997 10 25 11 47 97 4.4 -9 668.60 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 48 96 4.5 -9 668.60 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 49 97 4.5 -9 668.60 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 50 98 4.4 -9 668.60 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 51 98 4.4 -9 668.60 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 52 99 4.3 -9 668.60 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 11 53 100 4.4 -9 668.60 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 11 54 98 4.4 -9 668.60 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 11 55 98 4.4 -9 668.50 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 11 56 97 4.5 -9 668.50 -55.2 -54.2 -54.2 64 -99 SPO 1997 10 25 11 57 95 4.5 -9 668.50 -55.4 -54.2 -54.2 65 -99 SPO 1997 10 25 11 58 95 4.7 -9 668.50 -55.4 -54.2 -54.4 65 -99 SPO 1997 10 25 11 59 94 4.8 -9 668.50 -55.4 -54.2 -54.4 65 -99 SPO 1997 10 25 12 00 93 4.9 -9 668.50 -55.5 -54.0 -54.4 65 0 SPO 1997 10 25 12 01 92 4.8 -9 668.50 -55.5 -54.0 -54.5 65 -99 SPO 1997 10 25 12 02 92 5.0 -9 668.50 -55.5 -54.0 -54.5 65 -99 SPO 1997 10 25 12 03 92 5.2 -9 668.50 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 12 04 91 5.2 -9 668.50 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 12 05 90 5.3 -9 668.50 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 12 06 92 5.4 -9 668.50 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 12 07 90 5.3 -9 668.50 -55.4 -53.9 -54.5 65 -99 SPO 1997 10 25 12 08 90 5.3 -9 668.50 -55.4 -54.0 -54.5 65 -99 SPO 1997 10 25 12 09 90 5.4 -9 668.50 -55.2 -54.0 -54.5 64 -99 SPO 1997 10 25 12 10 89 5.3 -9 668.50 -55.2 -54.0 -54.5 64 -99 SPO 1997 10 25 12 11 90 5.2 -9 668.50 -55.2 -54.0 -54.4 64 -99 SPO 1997 10 25 12 12 89 5.1 -9 668.50 -55.2 -54.0 -54.4 64 -99 SPO 1997 10 25 12 13 90 5.2 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 14 90 5.1 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 15 90 5.1 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 16 89 5.1 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 17 88 5.1 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 18 87 4.9 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 19 87 5.0 -9 668.50 -55.2 -54.0 -54.4 67 -99 SPO 1997 10 25 12 20 87 5.0 -9 668.50 -55.2 -54.0 -54.4 66 -99 SPO 1997 10 25 12 21 86 5.0 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 22 86 4.9 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 23 87 5.1 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 24 87 5.2 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 25 84 5.3 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 26 85 5.2 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 27 85 5.3 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 28 85 5.2 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 29 84 5.2 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 30 83 5.1 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 31 84 5.4 -9 668.50 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 12 32 83 5.3 -9 668.50 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 12 33 84 5.4 -9 668.50 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 12 34 84 5.4 -9 668.50 -55.2 -54.0 -54.5 67 -99 SPO 1997 10 25 12 35 83 5.4 -9 668.50 -55.0 -54.0 -54.5 66 -99 SPO 1997 10 25 12 36 82 5.3 -9 668.50 -55.0 -54.0 -54.4 66 -99 SPO 1997 10 25 12 37 82 5.1 -9 668.50 -55.0 -53.9 -54.5 66 -99 SPO 1997 10 25 12 38 82 5.3 -9 668.50 -55.0 -53.9 -54.4 66 -99 SPO 1997 10 25 12 39 83 5.2 -9 668.50 -55.0 -54.0 -54.4 64 -99 SPO 1997 10 25 12 40 82 5.3 -9 668.50 -54.9 -54.0 -54.4 63 -99 SPO 1997 10 25 12 41 82 5.2 -9 668.50 -54.9 -54.0 -54.4 63 -99 SPO 1997 10 25 12 42 82 5.2 -9 668.50 -54.9 -54.0 -54.4 63 -99 SPO 1997 10 25 12 43 82 5.2 -9 668.50 -54.9 -54.0 -54.4 65 -99 SPO 1997 10 25 12 44 82 5.2 -9 668.50 -54.9 -53.9 -54.4 65 -99 SPO 1997 10 25 12 45 82 4.9 -9 668.50 -54.9 -54.0 -54.2 65 -99 SPO 1997 10 25 12 46 83 5.0 -9 668.50 -54.9 -54.0 -54.2 65 -99 SPO 1997 10 25 12 47 84 4.9 -9 668.50 -54.9 -54.0 -54.2 65 -99 SPO 1997 10 25 12 48 84 5.0 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 49 84 4.9 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 50 84 5.0 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 51 83 4.9 -9 668.50 -55.0 -54.0 -54.2 64 -99 SPO 1997 10 25 12 52 83 4.9 -9 668.60 -55.0 -54.0 -54.2 64 -99 SPO 1997 10 25 12 53 82 4.8 -9 668.50 -55.0 -54.0 -54.2 64 -99 SPO 1997 10 25 12 54 84 4.8 -9 668.50 -55.0 -54.0 -54.2 64 -99 SPO 1997 10 25 12 55 83 4.9 -9 668.50 -54.9 -54.0 -54.2 63 -99 SPO 1997 10 25 12 56 82 4.7 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 57 82 4.8 -9 668.60 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 58 82 4.8 -9 668.60 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 12 59 82 4.8 -9 668.60 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 00 81 4.8 -9 668.60 -55.0 -54.0 -54.2 66 0 SPO 1997 10 25 13 01 83 4.9 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 02 83 5.0 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 03 83 4.9 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 04 83 4.9 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 05 82 4.8 -9 668.50 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 25 13 06 80 4.8 -9 668.60 -55.0 -54.0 -54.4 64 -99 SPO 1997 10 25 13 07 79 4.8 -9 668.60 -55.0 -54.0 -54.4 64 -99 SPO 1997 10 25 13 08 76 4.8 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 09 76 4.9 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 10 75 5.0 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 11 74 5.0 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 12 74 5.2 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 13 74 5.2 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 14 74 5.1 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 15 74 5.1 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 16 75 5.2 -9 668.60 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 17 76 5.1 -9 668.60 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 13 18 76 5.2 -9 668.60 -55.2 -54.0 -54.5 66 -99 SPO 1997 10 25 13 19 76 5.0 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 13 20 76 5.1 -9 668.50 -55.0 -54.0 -54.5 64 -99 SPO 1997 10 25 13 21 76 5.1 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 13 22 75 5.2 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 13 23 75 5.2 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 13 24 75 5.3 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 13 25 74 5.3 -9 668.50 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 13 26 74 5.4 -9 668.50 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 13 27 74 5.3 -9 668.50 -55.2 -54.0 -54.7 66 -99 SPO 1997 10 25 13 28 73 5.4 -9 668.50 -55.2 -54.0 -54.7 64 -99 SPO 1997 10 25 13 29 73 5.4 -9 668.50 -55.2 -54.0 -54.7 64 -99 SPO 1997 10 25 13 30 72 5.4 -9 668.50 -55.2 -54.0 -54.7 64 -99 SPO 1997 10 25 13 31 72 5.4 -9 668.50 -55.2 -54.0 -54.7 64 -99 SPO 1997 10 25 13 32 71 5.5 -9 668.50 -55.2 -54.0 -54.9 63 -99 SPO 1997 10 25 13 33 70 5.6 -9 668.50 -55.2 -54.0 -54.9 63 -99 SPO 1997 10 25 13 34 69 5.7 -9 668.50 -55.2 -54.0 -54.9 63 -99 SPO 1997 10 25 13 35 69 5.9 -9 668.50 -55.2 -54.0 -54.9 63 -99 SPO 1997 10 25 13 36 69 6.2 -9 668.40 -55.2 -54.0 -54.7 63 -99 SPO 1997 10 25 13 37 69 6.4 -9 668.40 -55.2 -53.9 -54.7 63 -99 SPO 1997 10 25 13 38 69 6.6 -9 668.40 -55.0 -53.7 -54.7 62 -99 SPO 1997 10 25 13 39 70 6.6 -9 668.40 -55.0 -53.7 -54.7 62 -99 SPO 1997 10 25 13 40 69 6.7 -9 668.40 -55.0 -53.7 -54.7 64 -99 SPO 1997 10 25 13 41 69 6.4 -9 668.40 -55.0 -53.7 -54.7 64 -99 SPO 1997 10 25 13 42 69 6.3 -9 668.40 -55.0 -53.7 -54.7 64 -99 SPO 1997 10 25 13 43 70 6.3 -9 668.50 -55.0 -53.7 -54.7 66 -99 SPO 1997 10 25 13 44 70 6.3 -9 668.50 -55.0 -53.7 -54.7 64 -99 SPO 1997 10 25 13 45 70 6.0 -9 668.50 -55.0 -53.7 -54.7 64 -99 SPO 1997 10 25 13 46 71 6.0 -9 668.50 -55.0 -53.9 -54.7 64 -99 SPO 1997 10 25 13 47 71 6.0 -9 668.50 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 13 48 71 5.9 -9 668.50 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 13 49 71 5.8 -9 668.50 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 13 50 70 5.9 -9 668.50 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 51 70 5.9 -9 668.50 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 52 71 5.9 -9 668.50 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 53 72 6.1 -9 668.50 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 54 73 6.0 -9 668.50 -54.9 -54.0 -54.5 63 -99 SPO 1997 10 25 13 55 73 6.1 -9 668.50 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 56 74 5.9 -9 668.40 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 57 75 6.0 -9 668.40 -55.0 -54.0 -54.7 64 -99 SPO 1997 10 25 13 58 76 5.8 -9 668.40 -55.0 -54.2 -54.7 64 -99 SPO 1997 10 25 13 59 76 5.7 -9 668.40 -55.0 -54.2 -54.7 64 -99 SPO 1997 10 25 14 00 75 5.5 -9 668.40 -55.0 -54.2 -54.7 62 0 SPO 1997 10 25 14 01 76 5.6 -9 668.40 -55.2 -54.2 -54.7 63 -99 SPO 1997 10 25 14 02 76 5.8 -9 668.40 -55.2 -54.2 -54.7 63 -99 SPO 1997 10 25 14 03 76 5.8 -9 668.40 -55.0 -54.0 -54.7 62 -99 SPO 1997 10 25 14 04 77 5.8 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 05 79 6.0 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 06 78 5.8 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 07 77 5.7 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 08 77 5.7 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 09 77 5.7 -9 668.40 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 10 78 5.8 -9 668.40 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 11 77 5.6 -9 668.40 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 12 77 5.7 -9 668.40 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 13 77 5.5 -9 668.40 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 14 77 5.7 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 15 78 6.0 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 16 79 6.0 -9 668.40 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 17 80 6.0 -9 668.40 -54.9 -54.0 -54.4 61 -99 SPO 1997 10 25 14 18 79 5.8 -9 668.40 -54.9 -54.0 -54.5 62 -99 SPO 1997 10 25 14 19 78 5.8 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 20 77 5.7 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 21 77 5.9 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 22 76 6.1 -9 668.40 -54.7 -54.0 -54.5 62 -99 SPO 1997 10 25 14 23 76 6.2 -9 668.40 -54.7 -54.0 -54.5 62 -99 SPO 1997 10 25 14 24 75 6.3 -9 668.50 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 25 76 6.5 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 26 76 6.6 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 27 77 6.6 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 28 78 6.7 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 29 77 6.8 -9 668.40 -54.7 -54.0 -54.5 60 -99 SPO 1997 10 25 14 30 77 6.8 -9 668.40 -54.7 -53.9 -54.5 62 -99 SPO 1997 10 25 14 31 78 6.8 -9 668.40 -54.9 -53.9 -54.5 63 -99 SPO 1997 10 25 14 32 80 6.8 -9 668.40 -54.7 -53.9 -54.5 62 -99 SPO 1997 10 25 14 33 81 6.9 -9 668.40 -54.9 -53.9 -54.5 63 -99 SPO 1997 10 25 14 34 80 6.6 -9 668.40 -54.9 -53.9 -54.5 63 -99 SPO 1997 10 25 14 35 79 6.4 -9 668.40 -54.7 -53.9 -54.5 62 -99 SPO 1997 10 25 14 36 79 6.4 -9 668.40 -54.9 -54.0 -54.5 63 -99 SPO 1997 10 25 14 37 79 6.0 -9 668.50 -54.9 -54.0 -54.5 63 -99 SPO 1997 10 25 14 38 80 6.0 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 39 80 5.9 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 40 81 5.7 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 41 81 5.8 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 42 82 5.3 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 43 83 5.5 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 44 84 5.4 -9 668.50 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 45 84 5.4 -9 668.60 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 46 83 5.6 -9 668.60 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 47 84 5.6 -9 668.50 -55.0 -54.2 -54.5 62 -99 SPO 1997 10 25 14 48 85 5.5 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 49 86 5.8 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 14 50 87 5.9 -9 668.50 -55.0 -54.0 -54.4 62 -99 SPO 1997 10 25 14 51 86 6.0 -9 668.50 -55.0 -53.9 -54.5 60 -99 SPO 1997 10 25 14 52 84 6.0 -9 668.50 -55.0 -53.9 -54.5 60 -99 SPO 1997 10 25 14 53 82 6.0 -9 668.50 -55.0 -53.9 -54.4 60 -99 SPO 1997 10 25 14 54 82 6.1 -9 668.50 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 14 55 82 6.1 -9 668.50 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 14 56 83 6.2 -9 668.40 -54.9 -53.7 -54.4 59 -99 SPO 1997 10 25 14 57 83 6.3 -9 668.40 -54.9 -53.7 -54.4 61 -99 SPO 1997 10 25 14 58 83 6.2 -9 668.40 -54.9 -53.7 -54.5 61 -99 SPO 1997 10 25 14 59 82 6.2 -9 668.40 -54.9 -53.7 -54.5 61 -99 SPO 1997 10 25 15 00 83 6.1 -9 668.50 -55.0 -53.5 -54.5 62 0 SPO 1997 10 25 15 01 83 6.0 -9 668.50 -54.9 -53.5 -54.5 62 -99 SPO 1997 10 25 15 02 85 6.0 -9 668.40 -55.0 -53.5 -54.5 62 -99 SPO 1997 10 25 15 03 86 6.0 -9 668.40 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 04 86 6.3 -9 668.40 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 05 85 6.2 -9 668.40 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 06 85 6.2 -9 668.40 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 07 85 6.1 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 08 84 5.9 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 09 84 5.8 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 15 10 85 5.7 -9 668.50 -55.2 -54.0 -54.5 63 -99 SPO 1997 10 25 15 11 85 5.9 -9 668.50 -55.0 -54.0 -54.5 62 -99 SPO 1997 10 25 15 12 86 5.9 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 13 86 5.9 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 14 85 5.8 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 15 84 5.6 -9 668.50 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 16 84 5.5 -9 668.60 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 17 84 5.5 -9 668.60 -55.0 -53.9 -54.5 60 -99 SPO 1997 10 25 15 18 84 5.4 -9 668.60 -55.0 -53.9 -54.5 60 -99 SPO 1997 10 25 15 19 84 5.1 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 15 20 84 5.0 -9 668.60 -55.0 -53.9 -54.4 60 -99 SPO 1997 10 25 15 21 84 4.7 -9 668.70 -55.0 -54.0 -54.4 60 -99 SPO 1997 10 25 15 22 85 4.7 -9 668.60 -55.0 -54.0 -54.4 62 -99 SPO 1997 10 25 15 23 85 4.5 -9 668.70 -55.0 -54.2 -54.4 62 -99 SPO 1997 10 25 15 24 85 4.5 -9 668.70 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 15 25 87 4.7 -9 668.70 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 15 26 87 4.9 -9 668.70 -55.2 -54.2 -54.4 62 -99 SPO 1997 10 25 15 27 88 5.0 -9 668.60 -55.2 -54.0 -54.5 62 -99 SPO 1997 10 25 15 28 88 5.1 -9 668.60 -55.2 -54.0 -54.5 62 -99 SPO 1997 10 25 15 29 88 5.3 -9 668.60 -55.2 -54.0 -54.5 60 -99 SPO 1997 10 25 15 30 87 5.3 -9 668.60 -55.4 -53.9 -54.5 61 -99 SPO 1997 10 25 15 31 85 5.1 -9 668.60 -55.4 -53.9 -54.5 61 -99 SPO 1997 10 25 15 32 84 5.1 -9 668.60 -55.4 -53.9 -54.5 61 -99 SPO 1997 10 25 15 33 82 4.8 -9 668.60 -55.4 -54.0 -54.5 61 -99 SPO 1997 10 25 15 34 81 4.8 -9 668.70 -55.4 -54.0 -54.5 61 -99 SPO 1997 10 25 15 35 81 5.0 -9 668.60 -55.2 -53.9 -54.5 59 -99 SPO 1997 10 25 15 36 81 5.1 -9 668.60 -55.2 -53.9 -54.5 60 -99 SPO 1997 10 25 15 37 81 5.2 -9 668.60 -55.2 -53.7 -54.5 60 -99 SPO 1997 10 25 15 38 81 5.3 -9 668.60 -55.2 -53.7 -54.5 62 -99 SPO 1997 10 25 15 39 81 5.4 -9 668.60 -55.2 -53.9 -54.5 62 -99 SPO 1997 10 25 15 40 82 5.4 -9 668.60 -55.2 -53.9 -54.5 62 -99 SPO 1997 10 25 15 41 82 5.5 -9 668.60 -55.2 -53.9 -54.5 62 -99 SPO 1997 10 25 15 42 83 5.5 -9 668.60 -55.2 -53.7 -54.5 62 -99 SPO 1997 10 25 15 43 83 5.5 -9 668.60 -55.2 -53.7 -54.5 62 -99 SPO 1997 10 25 15 44 82 5.5 -9 668.60 -55.2 -53.7 -54.5 63 -99 SPO 1997 10 25 15 45 82 5.5 -9 668.60 -55.2 -53.9 -54.5 63 -99 SPO 1997 10 25 15 46 82 5.6 -9 668.60 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 47 82 5.5 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 48 82 5.4 -9 668.60 -55.0 -53.7 -54.4 62 -99 SPO 1997 10 25 15 49 81 5.5 -9 668.60 -55.0 -53.9 -54.4 62 -99 SPO 1997 10 25 15 50 81 5.6 -9 668.60 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 51 81 5.7 -9 668.60 -55.0 -53.9 -54.5 62 -99 SPO 1997 10 25 15 52 82 5.7 -9 668.60 -55.0 -53.9 -54.4 62 -99 SPO 1997 10 25 15 53 82 5.8 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 54 81 5.7 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 15 55 80 5.7 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 15 56 80 5.7 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 15 57 81 5.7 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 15 58 80 5.7 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 15 59 80 5.7 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 16 00 79 5.6 -9 668.60 -55.0 -53.7 -54.5 62 0 SPO 1997 10 25 16 01 80 5.6 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 16 02 80 5.6 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 16 03 81 5.7 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 16 04 82 5.7 -9 668.60 -55.0 -53.7 -54.5 62 -99 SPO 1997 10 25 16 05 82 5.6 -9 668.60 -55.0 -53.5 -54.5 62 -99 SPO 1997 10 25 16 06 82 5.7 -9 668.60 -55.0 -53.5 -54.5 62 -99 SPO 1997 10 25 16 07 81 5.6 -9 668.60 -55.0 -53.5 -54.5 62 -99 SPO 1997 10 25 16 08 81 5.5 -9 668.60 -55.0 -53.5 -54.5 60 -99 SPO 1997 10 25 16 09 81 5.4 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 16 10 82 5.4 -9 668.60 -55.0 -53.7 -54.5 60 -99 SPO 1997 10 25 16 11 82 5.3 -9 668.60 -55.0 -53.5 -54.5 60 -99 SPO 1997 10 25 16 12 82 5.2 -9 668.60 -55.0 -53.5 -54.5 60 -99 SPO 1997 10 25 16 13 82 5.3 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 14 81 5.3 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 15 80 5.2 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 16 80 5.2 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 17 80 5.2 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 18 80 5.2 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 19 80 5.2 -9 668.70 -55.2 -53.5 -54.5 60 -99 SPO 1997 10 25 16 20 81 5.3 -9 668.70 -55.2 -53.5 -54.5 60 -99 SPO 1997 10 25 16 21 82 5.3 -9 668.60 -55.2 -53.5 -54.5 60 -99 SPO 1997 10 25 16 22 83 5.2 -9 668.60 -55.2 -53.5 -54.4 60 -99 SPO 1997 10 25 16 23 83 5.2 -9 668.60 -55.2 -53.5 -54.4 60 -99 SPO 1997 10 25 16 24 84 5.2 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 25 84 5.2 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 26 85 5.3 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 27 85 5.4 -9 668.70 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 28 86 5.4 -9 668.70 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 29 85 5.4 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 30 85 5.4 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 31 85 5.3 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 32 84 5.3 -9 668.60 -55.2 -53.7 -54.4 62 -99 SPO 1997 10 25 16 33 84 5.2 -9 668.60 -55.2 -53.7 -54.4 62 -99 SPO 1997 10 25 16 34 85 5.3 -9 668.60 -55.2 -53.7 -54.4 62 -99 SPO 1997 10 25 16 35 85 5.2 -9 668.60 -55.2 -53.7 -54.4 62 -99 SPO 1997 10 25 16 36 86 5.1 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 37 85 5.1 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 38 85 5.1 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 39 84 5.1 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 40 84 5.1 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 41 84 5.1 -9 668.60 -55.4 -53.7 -54.5 63 -99 SPO 1997 10 25 16 42 84 4.9 -9 668.60 -55.2 -53.5 -54.4 62 -99 SPO 1997 10 25 16 43 85 4.9 -9 668.60 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 16 44 85 5.0 -9 668.60 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 16 45 83 4.9 -9 668.60 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 16 46 83 4.9 -9 668.60 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 16 47 82 5.0 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 48 83 5.0 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 49 82 5.1 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 50 82 5.1 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 51 82 5.2 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 52 81 5.2 -9 668.60 -55.5 -53.5 -54.5 64 -99 SPO 1997 10 25 16 53 80 5.2 -9 668.60 -55.5 -53.5 -54.5 64 -99 SPO 1997 10 25 16 54 80 5.2 -9 668.60 -55.4 -53.5 -54.5 62 -99 SPO 1997 10 25 16 55 80 5.2 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 56 80 5.1 -9 668.60 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 16 57 80 5.1 -9 668.60 -55.4 -53.4 -54.5 63 -99 SPO 1997 10 25 16 58 80 5.2 -9 668.60 -55.4 -53.4 -54.5 63 -99 SPO 1997 10 25 16 59 80 5.2 -9 668.60 -55.4 -53.2 -54.5 63 -99 SPO 1997 10 25 17 00 80 5.2 -9 668.60 -55.4 -53.2 -54.5 62 0 SPO 1997 10 25 17 01 80 5.2 -9 668.60 -55.4 -53.2 -54.5 62 -99 SPO 1997 10 25 17 02 79 5.3 -9 668.60 -55.4 -53.2 -54.5 62 -99 SPO 1997 10 25 17 03 79 5.3 -9 668.60 -55.2 -53.0 -54.5 62 -99 SPO 1997 10 25 17 04 79 5.3 -9 668.60 -55.2 -53.0 -54.5 62 -99 SPO 1997 10 25 17 05 79 5.3 -9 668.60 -55.2 -53.2 -54.5 63 -99 SPO 1997 10 25 17 06 79 5.3 -9 668.60 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 07 80 5.3 -9 668.60 -55.0 -53.2 -54.4 62 -99 SPO 1997 10 25 17 08 80 5.1 -9 668.60 -55.0 -53.2 -54.4 62 -99 SPO 1997 10 25 17 09 81 5.0 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 10 80 5.0 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 11 81 5.0 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 12 81 5.2 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 13 82 5.2 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 14 81 5.3 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 15 81 5.3 -9 668.60 -55.0 -53.2 -54.2 62 -99 SPO 1997 10 25 17 16 82 5.3 -9 668.60 -55.0 -53.4 -54.2 62 -99 SPO 1997 10 25 17 17 81 5.2 -9 668.60 -55.0 -53.4 -54.2 62 -99 SPO 1997 10 25 17 18 80 5.0 -9 668.60 -55.0 -53.4 -54.2 62 -99 SPO 1997 10 25 17 19 80 4.9 -9 668.60 -55.0 -53.5 -54.2 64 -99 SPO 1997 10 25 17 20 80 4.7 -9 668.60 -55.0 -53.5 -54.2 62 -99 SPO 1997 10 25 17 21 80 4.7 -9 668.60 -55.2 -53.5 -54.4 64 -99 SPO 1997 10 25 17 22 80 4.7 -9 668.70 -55.2 -53.5 -54.2 63 -99 SPO 1997 10 25 17 23 79 4.6 -9 668.70 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 17 24 79 4.5 -9 668.70 -55.2 -53.7 -54.4 63 -99 SPO 1997 10 25 17 25 79 4.5 -9 668.70 -55.2 -53.7 -54.4 63 -99 SPO 1997 10 25 17 26 80 4.6 -9 668.70 -55.2 -53.7 -54.4 63 -99 SPO 1997 10 25 17 27 79 4.5 -9 668.70 -55.4 -53.7 -54.4 65 -99 SPO 1997 10 25 17 28 80 4.6 -9 668.70 -55.2 -53.5 -54.2 63 -99 SPO 1997 10 25 17 29 79 4.6 -9 668.70 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 17 30 79 4.6 -9 668.70 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 17 31 79 4.6 -9 668.80 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 17 32 78 4.6 -9 668.80 -55.4 -53.5 -54.4 65 -99 SPO 1997 10 25 17 33 78 4.6 -9 668.80 -55.4 -53.4 -54.4 65 -99 SPO 1997 10 25 17 34 78 4.8 -9 668.80 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 35 79 4.9 -9 668.80 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 36 79 5.0 -9 668.80 -55.2 -53.2 -54.4 64 -99 SPO 1997 10 25 17 37 80 5.0 -9 668.80 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 38 80 5.0 -9 668.80 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 39 81 5.0 -9 668.80 -55.2 -53.2 -54.4 63 -99 SPO 1997 10 25 17 40 80 5.0 -9 668.80 -55.2 -53.4 -54.4 63 -99 SPO 1997 10 25 17 41 81 4.9 -9 668.80 -55.4 -53.5 -54.4 65 -99 SPO 1997 10 25 17 42 81 5.0 -9 668.80 -55.2 -53.5 -54.4 63 -99 SPO 1997 10 25 17 43 81 5.0 -9 668.80 -55.4 -53.5 -54.4 65 -99 SPO 1997 10 25 17 44 82 5.0 -9 668.80 -55.5 -53.5 -54.5 65 -99 SPO 1997 10 25 17 45 83 5.0 -9 668.80 -55.5 -53.5 -54.5 65 -99 SPO 1997 10 25 17 46 83 5.0 -9 668.80 -55.4 -53.5 -54.5 65 -99 SPO 1997 10 25 17 47 83 5.0 -9 668.80 -55.5 -53.5 -54.5 65 -99 SPO 1997 10 25 17 48 82 4.9 -9 668.80 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 17 49 82 4.9 -9 668.80 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 17 50 82 5.0 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 17 51 82 5.0 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 17 52 82 5.0 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 17 53 83 5.1 -9 668.80 -55.5 -53.7 -54.5 62 -99 SPO 1997 10 25 17 54 83 5.1 -9 668.80 -55.5 -53.5 -54.5 62 -99 SPO 1997 10 25 17 55 83 5.2 -9 668.80 -55.5 -53.5 -54.5 62 -99 SPO 1997 10 25 17 56 83 5.2 -9 668.80 -55.5 -53.5 -54.5 64 -99 SPO 1997 10 25 17 57 83 5.2 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 17 58 82 5.3 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 17 59 82 5.4 -9 668.80 -55.5 -53.7 -54.5 64 -99 SPO 1997 10 25 18 00 81 5.4 -9 668.80 -55.4 -53.5 -54.7 63 0 SPO 1997 10 25 18 01 81 5.5 -9 668.80 -55.5 -53.5 -54.5 64 -99 SPO 1997 10 25 18 02 80 5.4 -9 668.80 -55.4 -53.5 -54.5 63 -99 SPO 1997 10 25 18 03 80 5.4 -9 668.80 -55.4 -53.5 -54.7 63 -99 SPO 1997 10 25 18 04 80 5.5 -9 668.80 -55.2 -53.5 -54.5 62 -99 SPO 1997 10 25 18 05 80 5.4 -9 668.80 -55.2 -53.4 -54.5 62 -99 SPO 1997 10 25 18 06 80 5.4 -9 668.80 -55.2 -53.4 -54.5 62 -99 SPO 1997 10 25 18 07 80 5.5 -9 668.80 -55.2 -53.2 -54.5 63 -99 SPO 1997 10 25 18 08 79 5.4 -9 668.80 -55.0 -53.4 -54.5 62 -99 SPO 1997 10 25 18 09 79 5.4 -9 668.80 -55.0 -53.4 -54.5 62 -99 SPO 1997 10 25 18 10 78 5.3 -9 668.80 -55.0 -53.4 -54.5 62 -99 SPO 1997 10 25 18 11 78 5.2 -9 668.80 -55.0 -53.5 -54.5 62 -99 SPO 1997 10 25 18 12 79 5.3 -9 668.80 -55.0 -53.5 -54.5 64 -99 SPO 1997 10 25 18 13 79 5.2 -9 668.80 -55.0 -53.5 -54.4 64 -99 SPO 1997 10 25 18 14 80 5.2 -9 668.80 -55.0 -53.5 -54.4 64 -99 SPO 1997 10 25 18 15 81 5.3 -9 668.80 -55.0 -53.5 -54.4 64 -99 SPO 1997 10 25 18 16 81 5.2 -9 668.80 -55.0 -53.5 -54.4 64 -99 SPO 1997 10 25 18 17 81 5.2 -9 668.80 -55.0 -53.7 -54.4 62 -99 SPO 1997 10 25 18 18 80 5.0 -9 668.80 -55.0 -53.7 -54.4 62 -99 SPO 1997 10 25 18 19 79 5.0 -9 668.80 -55.2 -53.7 -54.4 64 -99 SPO 1997 10 25 18 20 79 4.8 -9 668.90 -55.2 -53.7 -54.4 64 -99 SPO 1997 10 25 18 21 79 4.7 -9 668.90 -55.0 -53.7 -54.4 62 -99 SPO 1997 10 25 18 22 79 4.6 -9 668.90 -55.0 -53.7 -54.4 62 -99 SPO 1997 10 25 18 23 79 4.6 -9 668.90 -55.0 -53.7 -54.2 62 -99 SPO 1997 10 25 18 24 80 4.5 -9 668.90 -55.0 -53.7 -54.2 62 -99 SPO 1997 10 25 18 25 80 4.4 -9 668.90 -55.0 -53.7 -54.2 62 -99 SPO 1997 10 25 18 26 81 4.4 -9 668.90 -55.0 -53.7 -54.2 62 -99 SPO 1997 10 25 18 27 82 4.4 -9 669.00 -55.0 -53.7 -54.2 62 -99 SPO 1997 10 25 18 28 82 4.5 -9 668.90 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 29 82 4.4 -9 668.90 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 30 84 4.4 -9 669.00 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 31 85 4.4 -9 668.90 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 32 85 4.4 -9 668.90 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 33 86 4.3 -9 669.00 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 18 34 86 4.3 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 35 86 4.5 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 36 86 4.4 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 37 86 4.3 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 38 87 4.3 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 39 87 4.3 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 40 86 4.3 -9 669.00 -55.2 -53.7 -54.0 66 -99 SPO 1997 10 25 18 41 84 4.3 -9 669.00 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 18 42 85 4.4 -9 669.00 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 18 43 86 4.4 -9 669.00 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 25 18 44 88 4.6 -9 669.00 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 45 89 4.4 -9 669.00 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 46 90 4.4 -9 669.00 -55.0 -53.7 -54.0 62 -99 SPO 1997 10 25 18 47 91 4.3 -9 669.00 -55.0 -53.7 -54.0 64 -99 SPO 1997 10 25 18 48 91 4.1 -9 669.00 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 49 91 4.1 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 50 91 4.1 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 51 92 4.0 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 52 91 3.9 -9 669.10 -55.0 -53.9 -53.7 64 -99 SPO 1997 10 25 18 53 92 4.0 -9 669.10 -55.0 -53.9 -53.7 64 -99 SPO 1997 10 25 18 54 93 4.0 -9 669.10 -55.0 -53.9 -53.7 64 -99 SPO 1997 10 25 18 55 93 4.2 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 56 94 4.3 -9 669.10 -55.2 -53.7 -53.9 66 -99 SPO 1997 10 25 18 57 94 4.3 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 58 94 4.5 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 18 59 95 4.5 -9 669.10 -55.0 -53.7 -53.9 64 -99 SPO 1997 10 25 19 00 94 4.5 -9 669.10 -55.0 -53.7 -53.9 66 0 SPO 1997 10 25 19 01 93 4.3 -9 669.10 -55.0 -53.7 -53.9 66 -99 SPO 1997 10 25 19 02 92 4.1 -9 669.20 -55.0 -53.7 -53.7 66 -99 SPO 1997 10 25 19 03 92 4.0 -9 669.20 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 04 92 4.0 -9 669.20 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 05 93 4.2 -9 669.20 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 06 93 4.3 -9 669.20 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 07 92 4.4 -9 669.10 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 08 91 4.4 -9 669.10 -55.0 -53.7 -53.7 64 -99 SPO 1997 10 25 19 09 90 4.4 -9 669.10 -55.0 -53.7 -53.9 62 -99 SPO 1997 10 25 19 10 90 4.3 -9 669.10 -55.2 -53.7 -53.9 64 -99 SPO 1997 10 25 19 11 89 4.3 -9 669.10 -55.2 -53.7 -53.9 64 -99 SPO 1997 10 25 19 12 89 4.4 -9 669.10 -55.2 -53.7 -53.9 64 -99 SPO 1997 10 25 19 13 89 4.4 -9 669.10 -55.2 -53.9 -53.9 64 -99 SPO 1997 10 25 19 14 89 4.4 -9 669.10 -55.2 -53.7 -53.9 64 -99 SPO 1997 10 25 19 15 88 4.4 -9 669.10 -55.2 -53.7 -53.9 64 -99 SPO 1997 10 25 19 16 89 4.5 -9 669.20 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 19 17 90 4.5 -9 669.20 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 19 18 90 4.4 -9 669.20 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 25 19 19 90 4.4 -9 669.20 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 25 19 20 91 4.4 -9 669.20 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 25 19 21 90 4.4 -9 669.20 -55.2 -53.9 -54.0 62 -99 SPO 1997 10 25 19 22 90 4.4 -9 669.20 -55.2 -53.9 -54.0 62 -99 SPO 1997 10 25 19 23 90 4.3 -9 669.20 -55.2 -53.9 -54.0 62 -99 SPO 1997 10 25 19 24 90 4.4 -9 669.20 -55.2 -53.9 -54.0 62 -99 SPO 1997 10 25 19 25 89 4.5 -9 669.20 -55.2 -53.9 -54.0 63 -99 SPO 1997 10 25 19 26 90 4.5 -9 669.20 -55.4 -54.0 -54.0 65 -99 SPO 1997 10 25 19 27 90 4.6 -9 669.20 -55.4 -54.0 -54.0 65 -99 SPO 1997 10 25 19 28 91 4.8 -9 669.20 -55.4 -54.0 -54.2 65 -99 SPO 1997 10 25 19 29 92 4.8 -9 669.20 -55.5 -54.0 -54.2 65 -99 SPO 1997 10 25 19 30 93 4.9 -9 669.20 -55.5 -54.0 -54.2 65 -99 SPO 1997 10 25 19 31 93 4.8 -9 669.20 -55.5 -54.0 -54.2 65 -99 SPO 1997 10 25 19 32 92 4.7 -9 669.20 -55.5 -54.0 -54.2 65 -99 SPO 1997 10 25 19 33 92 4.6 -9 669.20 -55.5 -54.0 -54.2 65 -99 SPO 1997 10 25 19 34 93 4.4 -9 669.30 -55.5 -54.2 -54.2 65 -99 SPO 1997 10 25 19 35 93 4.5 -9 669.30 -55.5 -54.2 -54.2 65 -99 SPO 1997 10 25 19 36 93 4.4 -9 669.30 -55.5 -54.0 -54.2 64 -99 SPO 1997 10 25 19 37 93 4.4 -9 669.30 -55.5 -54.0 -54.2 64 -99 SPO 1997 10 25 19 38 95 4.2 -9 669.30 -55.5 -54.0 -54.2 64 -99 SPO 1997 10 25 19 39 94 4.3 -9 669.30 -55.5 -54.0 -54.2 64 -99 SPO 1997 10 25 19 40 95 4.3 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 41 95 4.3 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 42 94 4.4 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 43 93 4.4 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 44 93 4.3 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 45 93 4.3 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 46 93 4.4 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 47 94 4.4 -9 669.30 -55.5 -54.2 -54.2 64 -99 SPO 1997 10 25 19 48 95 4.3 -9 669.30 -55.5 -54.2 -54.4 64 -99 SPO 1997 10 25 19 49 96 4.2 -9 669.30 -55.7 -54.2 -54.4 64 -99 SPO 1997 10 25 19 50 97 4.0 -9 669.30 -55.7 -54.2 -54.4 64 -99 SPO 1997 10 25 19 51 97 4.0 -9 669.40 -55.7 -54.2 -54.2 63 -99 SPO 1997 10 25 19 52 98 4.1 -9 669.30 -55.5 -54.2 -54.4 62 -99 SPO 1997 10 25 19 53 98 4.2 -9 669.30 -55.7 -54.2 -54.4 65 -99 SPO 1997 10 25 19 54 98 4.4 -9 669.30 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 19 55 98 4.5 -9 669.40 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 19 56 98 4.5 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 19 57 97 4.5 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 19 58 96 4.4 -9 669.40 -55.7 -54.0 -54.5 67 -99 SPO 1997 10 25 19 59 96 4.5 -9 669.40 -55.7 -54.0 -54.4 67 -99 SPO 1997 10 25 20 00 97 4.6 -9 669.40 -55.7 -54.0 -54.5 67 0 SPO 1997 10 25 20 01 97 4.5 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 02 97 4.5 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 03 98 4.4 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 04 98 4.5 -9 669.40 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 05 99 4.4 -9 669.40 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 20 06 99 4.4 -9 669.40 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 07 99 4.4 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 08 100 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 09 99 4.4 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 10 99 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 11 99 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 12 99 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 13 99 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 14 98 4.3 -9 669.40 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 15 97 4.3 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 16 96 4.2 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 17 96 4.2 -9 669.50 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 20 18 95 4.2 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 19 95 4.2 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 20 95 4.1 -9 669.50 -55.7 -54.2 -54.5 67 -99 SPO 1997 10 25 20 21 94 4.1 -9 669.50 -55.7 -54.2 -54.4 65 -99 SPO 1997 10 25 20 22 94 4.0 -9 669.60 -55.9 -54.2 -54.4 67 -99 SPO 1997 10 25 20 23 94 4.0 -9 669.60 -55.9 -54.2 -54.4 69 -99 SPO 1997 10 25 20 24 94 4.0 -9 669.60 -55.7 -54.2 -54.4 65 -99 SPO 1997 10 25 20 25 94 4.0 -9 669.60 -55.7 -54.2 -54.4 65 -99 SPO 1997 10 25 20 26 94 4.1 -9 669.60 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 20 27 94 4.0 -9 669.60 -55.7 -54.2 -54.5 65 -99 SPO 1997 10 25 20 28 95 4.0 -9 669.60 -55.9 -54.2 -54.5 67 -99 SPO 1997 10 25 20 29 96 4.0 -9 669.60 -55.9 -54.2 -54.5 65 -99 SPO 1997 10 25 20 30 96 3.9 -9 669.60 -56.0 -54.2 -54.5 66 -99 SPO 1997 10 25 20 31 96 3.8 -9 669.60 -55.9 -54.0 -54.5 65 -99 SPO 1997 10 25 20 32 96 3.8 -9 669.60 -55.9 -54.0 -54.5 67 -99 SPO 1997 10 25 20 33 96 3.9 -9 669.60 -56.0 -54.0 -54.7 68 -99 SPO 1997 10 25 20 34 98 3.9 -9 669.60 -56.0 -54.0 -54.7 68 -99 SPO 1997 10 25 20 35 98 4.0 -9 669.60 -56.0 -54.0 -54.7 68 -99 SPO 1997 10 25 20 36 99 4.1 -9 669.60 -56.0 -54.0 -54.9 68 -99 SPO 1997 10 25 20 37 99 4.2 -9 669.60 -56.0 -54.0 -54.9 68 -99 SPO 1997 10 25 20 38 99 4.2 -9 669.60 -56.0 -54.0 -54.9 68 -99 SPO 1997 10 25 20 39 99 4.1 -9 669.60 -56.0 -54.0 -54.9 68 -99 SPO 1997 10 25 20 40 98 4.1 -9 669.60 -56.0 -54.0 -54.9 65 -99 SPO 1997 10 25 20 41 97 4.2 -9 669.60 -56.0 -54.0 -54.9 65 -99 SPO 1997 10 25 20 42 96 4.2 -9 669.60 -56.0 -54.0 -54.7 65 -99 SPO 1997 10 25 20 43 96 4.2 -9 669.60 -56.0 -54.0 -54.7 65 -99 SPO 1997 10 25 20 44 97 4.3 -9 669.60 -56.0 -54.0 -54.7 65 -99 SPO 1997 10 25 20 45 97 4.3 -9 669.60 -55.9 -54.0 -54.9 65 -99 SPO 1997 10 25 20 46 96 4.3 -9 669.60 -56.0 -54.0 -54.9 66 -99 SPO 1997 10 25 20 47 95 4.1 -9 669.60 -55.9 -54.0 -54.7 65 -99 SPO 1997 10 25 20 48 95 4.2 -9 669.60 -55.9 -54.0 -54.7 65 -99 SPO 1997 10 25 20 49 96 4.2 -9 669.60 -55.9 -54.0 -54.7 65 -99 SPO 1997 10 25 20 50 95 4.3 -9 669.60 -55.9 -54.0 -54.7 67 -99 SPO 1997 10 25 20 51 95 4.3 -9 669.60 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 52 94 4.3 -9 669.60 -55.7 -54.0 -54.5 65 -99 SPO 1997 10 25 20 53 94 4.4 -9 669.60 -55.7 -54.0 -54.5 67 -99 SPO 1997 10 25 20 54 93 4.5 -9 669.50 -55.7 -54.0 -54.5 67 -99 SPO 1997 10 25 20 55 92 4.7 -9 669.60 -55.7 -53.9 -54.5 65 -99 SPO 1997 10 25 20 56 90 4.8 -9 669.60 -55.7 -53.7 -54.7 65 -99 SPO 1997 10 25 20 57 90 4.9 -9 669.60 -55.7 -53.7 -54.7 65 -99 SPO 1997 10 25 20 58 90 4.9 -9 669.60 -55.7 -53.9 -54.7 67 -99 SPO 1997 10 25 20 59 90 5.0 -9 669.60 -55.7 -53.9 -54.7 67 -99 SPO 1997 10 25 21 00 90 5.0 -9 669.60 -55.5 -53.9 -54.7 65 0 SPO 1997 10 25 21 01 89 5.0 -9 669.60 -55.7 -53.7 -54.7 67 -99 SPO 1997 10 25 21 02 89 5.0 -9 669.60 -55.7 -53.7 -54.5 67 -99 SPO 1997 10 25 21 03 89 4.9 -9 669.60 -55.7 -53.7 -54.5 67 -99 SPO 1997 10 25 21 04 89 4.9 -9 669.60 -55.7 -53.7 -54.5 68 -99 SPO 1997 10 25 21 05 89 5.0 -9 669.60 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 21 06 89 5.0 -9 669.60 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 21 07 89 4.9 -9 669.60 -55.7 -53.7 -54.7 67 -99 SPO 1997 10 25 21 08 88 4.9 -9 669.60 -55.7 -53.7 -54.7 65 -99 SPO 1997 10 25 21 09 88 5.0 -9 669.60 -55.7 -53.7 -54.7 65 -99 SPO 1997 10 25 21 10 88 5.0 -9 669.60 -55.7 -53.7 -54.7 65 -99 SPO 1997 10 25 21 11 89 5.0 -9 669.60 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 21 12 89 5.0 -9 669.70 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 21 13 90 5.0 -9 669.60 -55.5 -53.7 -54.5 66 -99 SPO 1997 10 25 21 14 90 4.8 -9 669.60 -55.5 -53.7 -54.5 66 -99 SPO 1997 10 25 21 15 90 4.7 -9 669.60 -55.5 -53.7 -54.5 66 -99 SPO 1997 10 25 21 16 90 4.6 -9 669.70 -55.5 -53.7 -54.5 66 -99 SPO 1997 10 25 21 17 90 4.6 -9 669.70 -55.5 -53.9 -54.5 66 -99 SPO 1997 10 25 21 18 90 4.6 -9 669.70 -55.5 -53.7 -54.5 65 -99 SPO 1997 10 25 21 19 90 4.6 -9 669.70 -55.5 -53.9 -54.5 -99 -99 SPO 1997 10 25 21 20 89 4.7 -9 669.70 -55.5 -53.9 -54.5 -99 -99 SPO 1997 10 25 21 21 -999 -99.9 -9 669.70 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 22 -999 -99.9 -9 669.70 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 23 -999 -99.9 -9 669.70 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 24 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 25 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 26 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 27 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 28 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 29 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 30 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 31 -999 -99.9 -9 669.80 -999.9 -999.9 -54.5 -99 -99 SPO 1997 10 25 21 32 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 33 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 34 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 35 -999 -99.9 -9 669.80 -53.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 36 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 37 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 38 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 39 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 40 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 41 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 42 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 43 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 44 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 45 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 46 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 47 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 48 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 49 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 50 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 51 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 52 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 53 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 54 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 55 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 56 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 57 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 58 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 21 59 -999 -99.9 -9 669.80 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 00 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 0 SPO 1997 10 25 22 01 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 02 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 03 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 04 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 05 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 06 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 07 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 08 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 09 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 10 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 11 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 12 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 13 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 14 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 15 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 16 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 17 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 18 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 19 -999 -99.9 -9 669.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 20 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 21 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 22 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 23 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 24 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 25 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 26 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 27 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 28 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 29 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 30 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 31 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 32 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 33 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 34 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 35 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 36 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 37 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 38 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 39 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 40 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 41 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 42 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 43 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 44 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 45 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 46 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 47 -999 -99.9 -9 670.00 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 48 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 49 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 50 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 51 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 52 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 53 -999 -99.9 -9 670.10 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 54 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 55 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 56 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 57 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 58 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 22 59 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 00 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 0 SPO 1997 10 25 23 01 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 02 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 03 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 04 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 05 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 06 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 07 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 08 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 09 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 10 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 11 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 12 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 13 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 14 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 15 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 16 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 17 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 18 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 19 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 20 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 21 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 22 -999 -99.9 -9 670.20 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 23 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 24 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 25 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 26 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 27 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 28 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 29 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 30 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 31 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 32 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 33 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 34 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 35 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 36 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 37 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 40 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 41 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 42 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 43 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 44 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 45 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 46 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 47 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 48 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 49 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 50 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 51 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 52 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 53 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 54 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 55 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 56 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 57 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 58 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 25 23 59 -999 -99.9 -9 670.30 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 26 00 00 88 5.1 -9 670.40 -55.2 -999.9 -54.4 -99 0 SPO 1997 10 26 00 01 88 5.1 -9 670.40 -55.2 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 02 89 5.1 -9 670.40 -55.4 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 03 90 5.1 -9 670.40 -55.4 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 04 89 5.2 -9 670.40 -55.4 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 05 89 5.0 -9 670.40 -55.4 -53.7 -54.3 -99 -99 SPO 1997 10 26 00 06 88 5.0 -9 670.40 -55.4 -53.7 -54.2 -99 -99 SPO 1997 10 26 00 07 88 5.0 -9 670.40 -55.4 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 08 89 4.9 -9 670.40 -55.4 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 09 89 4.9 -9 670.40 -55.4 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 10 90 4.8 -9 670.40 -999.9 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 11 -999 -99.9 -9 670.40 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 26 00 12 90 4.7 -9 670.40 -999.9 -999.9 -54.2 -99 -99 SPO 1997 10 26 00 13 89 4.7 -9 670.40 -999.9 -999.9 -54.2 -99 -99 SPO 1997 10 26 00 14 88 4.8 -9 670.40 -55.5 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 15 88 4.8 -9 670.40 -55.5 -53.5 -54.2 -99 -99 SPO 1997 10 26 00 16 88 4.8 -9 670.40 -55.5 -53.7 -54.2 -99 -99 SPO 1997 10 26 00 17 89 4.9 -9 670.40 -55.5 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 18 90 4.9 -9 670.40 -55.5 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 19 90 4.8 -9 670.40 -55.5 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 20 90 4.9 -9 670.40 -55.5 -53.5 -54.3 -99 -99 SPO 1997 10 26 00 21 90 4.9 -9 670.40 -55.5 -53.5 -54.4 -99 -99 SPO 1997 10 26 00 22 91 4.9 -9 670.40 -55.7 -53.5 -54.4 -99 -99 SPO 1997 10 26 00 23 91 4.8 -9 670.40 -55.7 -53.5 -54.4 -99 -99 SPO 1997 10 26 00 24 91 4.7 -9 670.40 -55.7 -53.7 -54.4 -99 -99 SPO 1997 10 26 00 25 92 4.7 -9 670.40 -55.7 -53.7 -54.4 -99 -99 SPO 1997 10 26 00 26 92 4.7 -9 670.40 -55.7 -53.7 -54.4 -99 -99 SPO 1997 10 26 00 27 92 4.7 -9 670.40 -55.7 -53.9 -54.5 -99 -99 SPO 1997 10 26 00 28 93 4.7 -9 670.40 -55.7 -53.9 -54.5 -99 -99 SPO 1997 10 26 00 29 94 4.7 -9 670.40 -55.7 -54.0 -54.6 -99 -99 SPO 1997 10 26 00 30 93 4.7 -9 670.40 -55.7 -54.0 -54.6 -99 -99 SPO 1997 10 26 00 31 92 4.7 -9 670.40 -55.7 -54.0 -54.7 -99 -99 SPO 1997 10 26 00 32 91 4.6 -9 670.40 -55.9 -54.0 -54.8 -99 -99 SPO 1997 10 26 00 33 92 4.5 -9 670.40 -55.9 -54.0 -54.9 -99 -99 SPO 1997 10 26 00 34 92 4.5 -9 670.40 -55.9 -54.0 -55.0 -99 -99 SPO 1997 10 26 00 35 91 4.5 -9 670.40 -56.0 -54.2 -55.1 -99 -99 SPO 1997 10 26 00 36 92 4.4 -9 670.40 -55.9 -54.2 -55.1 -99 -99 SPO 1997 10 26 00 37 91 4.4 -9 670.40 -55.9 -54.2 -55.1 -99 -99 SPO 1997 10 26 00 38 90 4.3 -9 670.40 -56.0 -54.2 -55.2 61 -99 SPO 1997 10 26 00 39 90 4.3 -9 670.40 -56.0 -54.2 -55.2 60 -99 SPO 1997 10 26 00 40 90 4.3 -9 670.40 -56.0 -54.2 -55.3 60 -99 SPO 1997 10 26 00 41 89 4.3 -9 670.40 -56.0 -54.2 -55.3 60 -99 SPO 1997 10 26 00 42 89 4.4 -9 670.40 -56.0 -54.2 -55.3 60 -99 SPO 1997 10 26 00 43 89 4.5 -9 670.40 -56.0 -54.2 -55.2 61 -99 SPO 1997 10 26 00 44 88 4.5 -9 670.40 -56.0 -54.0 -55.1 61 -99 SPO 1997 10 26 00 45 87 4.5 -9 670.40 -56.0 -54.0 -55.0 61 -99 SPO 1997 10 26 00 46 87 4.6 -9 670.40 -56.0 -54.0 -55.0 61 -99 SPO 1997 10 26 00 47 86 4.6 -9 670.40 -56.0 -54.2 -55.0 62 -99 SPO 1997 10 26 00 48 86 4.8 -9 670.40 -56.0 -54.0 -55.0 62 -99 SPO 1997 10 26 00 49 85 4.8 -9 670.40 -56.0 -54.0 -55.1 62 -99 SPO 1997 10 26 00 50 83 5.0 -9 670.40 -56.0 -54.0 -55.2 62 -99 SPO 1997 10 26 00 51 82 5.0 -9 670.40 -56.0 -53.9 -55.2 62 -99 SPO 1997 10 26 00 52 81 5.2 -9 670.40 -56.0 -53.9 -55.3 61 -99 SPO 1997 10 26 00 53 81 5.4 -9 670.40 -56.0 -53.7 -55.3 61 -99 SPO 1997 10 26 00 54 81 5.5 -9 670.40 -56.0 -53.7 -55.3 61 -99 SPO 1997 10 26 00 55 80 5.6 -9 670.40 -56.0 -53.5 -55.3 61 -99 SPO 1997 10 26 00 56 79 5.7 -9 670.40 -56.0 -53.5 -55.3 61 -99 SPO 1997 10 26 00 57 79 5.8 -9 670.40 -55.9 -53.4 -55.4 61 -99 SPO 1997 10 26 00 58 80 5.9 -9 670.40 -55.9 -53.2 -55.3 61 -99 SPO 1997 10 26 00 59 79 6.0 -9 670.30 -55.9 -53.2 -55.3 63 -99 SPO 1997 10 26 01 00 80 6.0 -9 670.30 -55.9 -53.2 -55.3 63 0 SPO 1997 10 26 01 01 80 6.0 -9 670.30 -55.9 -53.2 -55.3 63 -99 SPO 1997 10 26 01 02 79 6.1 -9 670.30 -55.9 -53.4 -55.3 63 -99 SPO 1997 10 26 01 03 79 6.1 -9 670.30 -55.9 -53.4 -55.3 63 -99 SPO 1997 10 26 01 04 79 6.1 -9 670.30 -55.7 -53.4 -55.3 61 -99 SPO 1997 10 26 01 05 80 6.2 -9 670.30 -55.7 -53.2 -55.3 61 -99 SPO 1997 10 26 01 06 80 6.2 -9 670.30 -55.7 -53.2 -55.2 61 -99 SPO 1997 10 26 01 07 80 6.0 -9 670.30 -55.7 -53.2 -55.2 61 -99 SPO 1997 10 26 01 08 80 6.0 -9 670.30 -55.7 -53.2 -55.2 61 -99 SPO 1997 10 26 01 09 80 6.0 -9 670.30 -55.7 -53.2 -55.2 61 -99 SPO 1997 10 26 01 10 81 5.8 -9 670.30 -55.7 -53.4 -55.1 63 -99 SPO 1997 10 26 01 11 82 5.7 -9 670.30 -55.7 -53.4 -55.1 63 -99 SPO 1997 10 26 01 12 83 5.6 -9 670.30 -55.7 -53.4 -55.0 63 -99 SPO 1997 10 26 01 13 84 5.4 -9 670.30 -55.7 -53.2 -55.0 63 -99 SPO 1997 10 26 01 14 84 5.3 -9 670.30 -55.7 -53.2 -55.0 63 -99 SPO 1997 10 26 01 15 84 5.2 -9 670.30 -55.7 -53.2 -54.9 63 -99 SPO 1997 10 26 01 16 84 5.2 -9 670.30 -55.9 -53.2 -54.9 65 -99 SPO 1997 10 26 01 17 85 5.1 -9 670.30 -55.9 -53.2 -54.9 63 -99 SPO 1997 10 26 01 18 85 5.2 -9 670.40 -55.9 -53.2 -54.9 63 -99 SPO 1997 10 26 01 19 85 5.0 -9 670.40 -55.9 -53.2 -54.8 61 -99 SPO 1997 10 26 01 20 85 5.1 -9 670.40 -55.9 -53.4 -54.8 61 -99 SPO 1997 10 26 01 21 86 4.9 -9 670.40 -55.9 -53.4 -54.8 61 -99 SPO 1997 10 26 01 22 87 4.8 -9 670.40 -55.9 -53.5 -54.7 63 -99 SPO 1997 10 26 01 23 88 4.8 -9 670.40 -55.7 -53.5 -54.7 61 -99 SPO 1997 10 26 01 24 89 4.7 -9 670.40 -55.9 -53.5 -54.7 65 -99 SPO 1997 10 26 01 25 90 4.7 -9 670.40 -55.9 -53.5 -54.7 65 -99 SPO 1997 10 26 01 26 91 4.7 -9 670.40 -55.9 -53.5 -54.7 65 -99 SPO 1997 10 26 01 27 91 4.6 -9 670.40 -55.9 -53.5 -54.6 65 -99 SPO 1997 10 26 01 28 93 4.6 -9 670.50 -55.7 -53.5 -54.6 63 -99 SPO 1997 10 26 01 29 94 4.6 -9 670.50 -55.7 -53.5 -54.6 63 -99 SPO 1997 10 26 01 30 95 4.6 -9 670.50 -55.7 -53.5 -54.5 63 -99 SPO 1997 10 26 01 31 95 4.6 -9 670.40 -55.7 -53.5 -54.5 63 -99 SPO 1997 10 26 01 32 95 4.5 -9 670.50 -55.7 -53.5 -54.5 63 -99 SPO 1997 10 26 01 33 95 4.5 -9 670.50 -55.7 -53.5 -54.5 63 -99 SPO 1997 10 26 01 34 95 4.5 -9 670.50 -55.7 -53.5 -54.4 63 -99 SPO 1997 10 26 01 35 94 4.5 -9 670.50 -55.5 -53.5 -54.4 62 -99 SPO 1997 10 26 01 36 93 4.4 -9 670.60 -55.5 -53.5 -54.3 64 -99 SPO 1997 10 26 01 37 94 4.3 -9 670.60 -55.5 -53.5 -54.2 64 -99 SPO 1997 10 26 01 38 93 4.2 -9 670.60 -55.5 -53.5 -54.2 64 -99 SPO 1997 10 26 01 39 93 4.3 -9 670.60 -55.5 -53.5 -54.1 65 -99 SPO 1997 10 26 01 40 94 4.1 -9 670.60 -55.4 -53.7 -54.1 65 -99 SPO 1997 10 26 01 41 94 4.0 -9 670.60 -55.4 -53.7 -54.0 65 -99 SPO 1997 10 26 01 42 95 4.0 -9 670.70 -55.4 -53.7 -54.0 65 -99 SPO 1997 10 26 01 43 96 4.1 -9 670.60 -55.2 -53.5 -53.9 64 -99 SPO 1997 10 26 01 44 95 4.2 -9 670.60 -55.2 -53.5 -53.9 64 -99 SPO 1997 10 26 01 45 93 4.5 -9 670.60 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 01 46 92 4.3 -9 670.70 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 01 47 93 4.3 -9 670.70 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 26 01 48 92 4.5 -9 670.60 -55.4 -53.5 -54.0 65 -99 SPO 1997 10 26 01 49 92 4.5 -9 670.60 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 01 50 93 4.6 -9 670.60 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 01 51 93 4.7 -9 670.60 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 01 52 93 4.7 -9 670.60 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 01 53 92 4.7 -9 670.60 -55.2 -53.5 -54.0 62 -99 SPO 1997 10 26 01 54 92 4.6 -9 670.60 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 01 55 91 4.4 -9 670.60 -55.2 -53.5 -53.9 63 -99 SPO 1997 10 26 01 56 90 4.4 -9 670.70 -55.2 -53.5 -53.9 63 -99 SPO 1997 10 26 01 57 91 4.3 -9 670.70 -55.2 -53.5 -53.9 63 -99 SPO 1997 10 26 01 58 93 4.4 -9 670.70 -55.2 -53.7 -53.9 63 -99 SPO 1997 10 26 01 59 93 4.4 -9 670.70 -55.2 -53.7 -53.9 63 -99 SPO 1997 10 26 02 00 94 4.3 -9 670.70 -55.2 -53.7 -53.9 63 0 SPO 1997 10 26 02 01 94 4.3 -9 670.70 -55.4 -53.7 -53.9 65 -99 SPO 1997 10 26 02 02 95 4.4 -9 670.80 -55.4 -53.7 -53.9 65 -99 SPO 1997 10 26 02 03 96 4.5 -9 670.80 -55.4 -53.7 -54.0 65 -99 SPO 1997 10 26 02 04 96 4.6 -9 670.80 -55.4 -53.7 -54.0 65 -99 SPO 1997 10 26 02 05 95 4.6 -9 670.80 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 26 02 06 94 4.5 -9 670.80 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 26 02 07 95 4.5 -9 670.80 -55.2 -53.7 -54.0 63 -99 SPO 1997 10 26 02 08 95 4.6 -9 670.80 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 02 09 96 4.6 -9 670.80 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 02 10 96 4.7 -9 670.80 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 02 11 95 4.6 -9 670.80 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 02 12 96 4.6 -9 670.80 -55.2 -53.5 -54.0 63 -99 SPO 1997 10 26 02 13 96 4.6 -9 670.80 -55.2 -53.7 -54.0 64 -99 SPO 1997 10 26 02 14 97 4.5 -9 670.80 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 15 98 4.5 -9 670.80 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 16 98 4.6 -9 670.80 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 17 97 4.6 -9 670.80 -55.2 -53.5 -53.9 64 -99 SPO 1997 10 26 02 18 97 4.7 -9 670.80 -55.2 -53.5 -53.9 66 -99 SPO 1997 10 26 02 19 97 4.8 -9 670.80 -55.2 -53.5 -53.9 66 -99 SPO 1997 10 26 02 20 97 4.8 -9 670.80 -55.2 -53.5 -53.9 66 -99 SPO 1997 10 26 02 21 97 4.8 -9 670.80 -55.2 -53.4 -53.9 66 -99 SPO 1997 10 26 02 22 96 4.9 -9 670.80 -55.2 -53.4 -53.9 66 -99 SPO 1997 10 26 02 23 98 4.8 -9 670.80 -55.2 -53.2 -54.0 66 -99 SPO 1997 10 26 02 24 98 5.0 -9 670.80 -55.2 -53.2 -54.0 66 -99 SPO 1997 10 26 02 25 99 5.1 -9 670.80 -55.2 -53.2 -54.0 64 -99 SPO 1997 10 26 02 26 97 5.0 -9 670.80 -55.2 -53.4 -54.0 64 -99 SPO 1997 10 26 02 27 97 5.0 -9 670.80 -55.2 -53.2 -54.0 64 -99 SPO 1997 10 26 02 28 97 5.2 -9 670.80 -55.2 -53.2 -54.0 63 -99 SPO 1997 10 26 02 29 97 5.2 -9 670.80 -55.2 -53.2 -54.0 64 -99 SPO 1997 10 26 02 30 97 5.2 -9 670.80 -55.2 -53.2 -54.0 66 -99 SPO 1997 10 26 02 31 97 5.2 -9 670.80 -55.2 -53.2 -54.0 66 -99 SPO 1997 10 26 02 32 96 5.1 -9 670.80 -55.2 -53.2 -53.9 66 -99 SPO 1997 10 26 02 33 96 5.1 -9 670.80 -55.2 -53.2 -53.9 66 -99 SPO 1997 10 26 02 34 97 5.1 -9 670.80 -55.2 -53.4 -53.9 66 -99 SPO 1997 10 26 02 35 97 5.0 -9 670.80 -55.0 -53.4 -54.0 64 -99 SPO 1997 10 26 02 36 97 5.0 -9 670.80 -55.2 -53.5 -54.0 66 -99 SPO 1997 10 26 02 37 96 4.9 -9 670.80 -55.2 -53.4 -54.0 66 -99 SPO 1997 10 26 02 38 97 5.0 -9 670.80 -55.2 -53.4 -54.0 66 -99 SPO 1997 10 26 02 39 95 4.9 -9 670.80 -55.2 -53.5 -54.0 66 -99 SPO 1997 10 26 02 40 94 5.0 -9 670.80 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 41 94 5.1 -9 670.70 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 42 94 5.1 -9 670.70 -55.2 -53.5 -54.0 64 -99 SPO 1997 10 26 02 43 94 5.0 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 44 92 5.2 -9 670.70 -55.2 -53.5 -54.0 66 -99 SPO 1997 10 26 02 45 91 5.1 -9 670.70 -55.2 -53.5 -54.0 66 -99 SPO 1997 10 26 02 46 91 5.2 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 47 90 5.1 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 48 91 5.2 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 49 91 5.3 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 50 90 5.3 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 51 90 5.3 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 52 89 5.3 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 53 89 5.4 -9 670.70 -55.0 -53.5 -54.0 64 -99 SPO 1997 10 26 02 54 90 5.4 -9 670.70 -55.0 -53.4 -54.0 64 -99 SPO 1997 10 26 02 55 89 5.6 -9 670.70 -55.0 -53.4 -54.0 64 -99 SPO 1997 10 26 02 56 89 5.5 -9 670.70 -54.9 -53.5 -54.0 65 -99 SPO 1997 10 26 02 57 89 5.4 -9 670.70 -54.9 -53.5 -54.0 65 -99 SPO 1997 10 26 02 58 88 5.4 -9 670.70 -54.9 -53.5 -53.9 65 -99 SPO 1997 10 26 02 59 88 5.3 -9 670.70 -54.9 -53.5 -53.9 65 -99 SPO 1997 10 26 03 00 88 5.2 -9 670.70 -54.9 -53.7 -53.9 65 0 SPO 1997 10 26 03 01 88 5.2 -9 670.70 -54.9 -53.7 -53.9 65 -99 SPO 1997 10 26 03 02 88 5.1 -9 670.70 -54.9 -53.7 -53.9 65 -99 SPO 1997 10 26 03 03 89 5.0 -9 670.70 -54.9 -53.7 -53.8 65 -99 SPO 1997 10 26 03 04 90 5.0 -9 670.70 -55.0 -53.9 -53.8 64 -99 SPO 1997 10 26 03 05 90 4.9 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 06 91 4.8 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 07 92 4.8 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 08 91 4.9 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 09 91 4.8 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 10 92 4.9 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 11 91 4.8 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 12 91 4.8 -9 670.70 -54.9 -54.0 -53.8 63 -99 SPO 1997 10 26 03 13 91 4.8 -9 670.70 -54.9 -54.0 -53.8 63 -99 SPO 1997 10 26 03 14 91 4.8 -9 670.70 -54.9 -54.0 -53.8 63 -99 SPO 1997 10 26 03 15 91 4.8 -9 670.70 -54.9 -54.0 -53.8 63 -99 SPO 1997 10 26 03 16 90 4.5 -9 670.70 -55.0 -54.0 -53.8 64 -99 SPO 1997 10 26 03 17 90 4.6 -9 670.70 -55.0 -54.0 -53.7 64 -99 SPO 1997 10 26 03 18 89 4.6 -9 670.70 -54.9 -54.0 -53.7 63 -99 SPO 1997 10 26 03 19 89 4.5 -9 670.70 -55.0 -54.0 -53.7 64 -99 SPO 1997 10 26 03 20 88 4.4 -9 670.70 -54.9 -54.0 -53.7 63 -99 SPO 1997 10 26 03 21 88 4.9 -9 670.70 -54.7 -54.0 -53.6 62 -99 SPO 1997 10 26 03 22 87 4.5 -9 670.70 -54.7 -53.9 -53.6 63 -99 SPO 1997 10 26 03 23 86 4.4 -9 670.70 -54.7 -53.9 -53.6 63 -99 SPO 1997 10 26 03 24 86 4.3 -9 670.70 -54.7 -53.9 -53.5 64 -99 SPO 1997 10 26 03 25 85 4.3 -9 670.70 -54.5 -53.9 -53.5 64 -99 SPO 1997 10 26 03 26 87 4.4 -9 670.70 -54.7 -53.9 -53.5 66 -99 SPO 1997 10 26 03 27 88 4.5 -9 670.70 -54.5 -53.9 -53.5 64 -99 SPO 1997 10 26 03 28 86 4.5 -9 670.70 -54.5 -53.9 -53.5 64 -99 SPO 1997 10 26 03 29 86 4.2 -9 670.70 -54.5 -53.9 -53.5 64 -99 SPO 1997 10 26 03 30 85 4.6 -9 670.70 -54.5 -53.9 -53.5 63 -99 SPO 1997 10 26 03 31 86 4.8 -9 670.70 -54.5 -53.9 -53.5 63 -99 SPO 1997 10 26 03 32 86 4.7 -9 670.70 -54.5 -54.0 -53.5 64 -99 SPO 1997 10 26 03 33 85 4.6 -9 670.70 -54.5 -54.0 -53.5 64 -99 SPO 1997 10 26 03 34 84 4.6 -9 670.70 -54.5 -54.0 -53.6 64 -99 SPO 1997 10 26 03 35 83 4.7 -9 670.70 -54.5 -54.0 -53.6 64 -99 SPO 1997 10 26 03 36 82 4.8 -9 670.70 -54.5 -54.0 -53.7 64 -99 SPO 1997 10 26 03 37 82 4.8 -9 670.70 -54.7 -54.0 -53.7 66 -99 SPO 1997 10 26 03 38 82 4.7 -9 670.80 -54.7 -54.0 -53.8 66 -99 SPO 1997 10 26 03 39 84 4.6 -9 670.80 -54.7 -54.0 -53.8 66 -99 SPO 1997 10 26 03 40 83 4.9 -9 670.70 -54.7 -54.0 -53.7 66 -99 SPO 1997 10 26 03 41 84 4.9 -9 670.70 -54.7 -54.0 -53.7 66 -99 SPO 1997 10 26 03 42 84 4.6 -9 670.70 -54.5 -54.0 -53.7 63 -99 SPO 1997 10 26 03 43 84 4.8 -9 670.70 -54.5 -54.0 -53.7 63 -99 SPO 1997 10 26 03 44 84 4.7 -9 670.70 -54.5 -54.0 -53.6 62 -99 SPO 1997 10 26 03 45 84 4.6 -9 670.70 -54.7 -54.0 -53.6 63 -99 SPO 1997 10 26 03 46 83 4.4 -9 670.80 -54.5 -54.0 -53.6 62 -99 SPO 1997 10 26 03 47 83 4.2 -9 670.80 -54.5 -54.0 -53.6 62 -99 SPO 1997 10 26 03 48 83 4.2 -9 670.80 -54.5 -54.0 -53.5 62 -99 SPO 1997 10 26 03 49 83 4.1 -9 670.80 -54.5 -54.0 -53.5 63 -99 SPO 1997 10 26 03 50 84 3.6 -9 670.80 -54.5 -54.0 -53.4 64 -99 SPO 1997 10 26 03 51 85 3.2 -9 670.80 -54.5 -54.0 -53.3 64 -99 SPO 1997 10 26 03 52 85 3.2 -9 670.80 -54.5 -54.0 -53.2 64 -99 SPO 1997 10 26 03 53 82 2.9 -9 670.90 -54.5 -54.2 -53.1 64 -99 SPO 1997 10 26 03 54 82 2.6 -9 670.90 -54.5 -54.2 -53.0 64 -99 SPO 1997 10 26 03 55 82 2.5 -9 671.00 -54.5 -54.2 -53.0 64 -99 SPO 1997 10 26 03 56 85 2.3 -9 671.00 -54.7 -54.2 -52.7 64 -99 SPO 1997 10 26 03 57 85 2.3 -9 671.00 -54.7 -54.2 -52.5 64 -99 SPO 1997 10 26 03 58 88 2.7 -9 671.00 -54.7 -54.2 -52.5 64 -99 SPO 1997 10 26 03 59 86 2.5 -9 671.00 -54.5 -54.0 -52.5 63 -99 SPO 1997 10 26 04 00 90 2.6 -9 671.00 -54.5 -54.0 -52.5 64 0 SPO 1997 10 26 04 01 89 2.7 -9 671.00 -54.5 -54.0 -52.5 64 -99 SPO 1997 10 26 04 02 90 2.4 -9 671.00 -54.5 -54.0 -52.4 66 -99 SPO 1997 10 26 04 03 94 2.4 -9 671.10 -54.5 -54.0 -52.3 66 -99 SPO 1997 10 26 04 04 93 2.6 -9 671.10 -54.5 -54.0 -52.3 66 -99 SPO 1997 10 26 04 05 95 2.5 -9 671.10 -54.5 -54.0 -52.3 66 -99 SPO 1997 10 26 04 06 95 2.5 -9 671.10 -54.5 -54.0 -52.3 66 -99 SPO 1997 10 26 04 07 93 2.8 -9 671.10 -54.5 -54.0 -52.2 68 -99 SPO 1997 10 26 04 08 90 2.7 -9 671.10 -54.5 -54.0 -52.2 68 -99 SPO 1997 10 26 04 09 89 2.9 -9 671.10 -54.5 -54.0 -52.2 66 -99 SPO 1997 10 26 04 10 90 3.0 -9 671.10 -54.5 -54.0 -52.4 66 -99 SPO 1997 10 26 04 11 90 3.3 -9 671.10 -54.5 -53.9 -52.5 66 -99 SPO 1997 10 26 04 12 90 2.9 -9 671.10 -54.5 -53.9 -52.5 66 -99 SPO 1997 10 26 04 13 89 3.0 -9 671.10 -54.5 -53.9 -52.5 64 -99 SPO 1997 10 26 04 14 85 3.1 -9 671.10 -54.5 -53.9 -52.5 66 -99 SPO 1997 10 26 04 15 86 3.4 -9 671.10 -54.5 -53.9 -52.6 66 -99 SPO 1997 10 26 04 16 87 3.3 -9 671.10 -54.5 -53.9 -52.6 66 -99 SPO 1997 10 26 04 17 88 3.5 -9 671.10 -54.5 -53.7 -52.7 66 -99 SPO 1997 10 26 04 18 88 3.6 -9 671.10 -54.5 -53.7 -52.7 66 -99 SPO 1997 10 26 04 19 87 3.6 -9 671.10 -54.5 -53.7 -52.8 66 -99 SPO 1997 10 26 04 20 87 3.7 -9 671.10 -54.5 -53.7 -52.9 66 -99 SPO 1997 10 26 04 21 87 3.6 -9 671.10 -54.7 -53.7 -52.9 67 -99 SPO 1997 10 26 04 22 87 3.7 -9 671.20 -54.7 -53.9 -52.9 67 -99 SPO 1997 10 26 04 23 87 3.6 -9 671.20 -54.7 -53.9 -52.9 66 -99 SPO 1997 10 26 04 24 87 3.7 -9 671.20 -54.7 -54.0 -52.9 66 -99 SPO 1997 10 26 04 25 88 3.6 -9 671.20 -54.7 -53.9 -53.0 66 -99 SPO 1997 10 26 04 26 89 3.6 -9 671.20 -54.7 -53.9 -53.0 66 -99 SPO 1997 10 26 04 27 89 3.6 -9 671.20 -54.7 -54.0 -53.0 64 -99 SPO 1997 10 26 04 28 88 3.5 -9 671.20 -54.7 -54.0 -53.1 64 -99 SPO 1997 10 26 04 29 90 3.6 -9 671.20 -54.7 -54.0 -53.0 64 -99 SPO 1997 10 26 04 30 93 3.5 -9 671.20 -54.7 -54.0 -53.1 64 -99 SPO 1997 10 26 04 31 94 3.6 -9 671.20 -54.7 -54.0 -53.1 64 -99 SPO 1997 10 26 04 32 95 3.4 -9 671.20 -54.7 -53.9 -53.1 64 -99 SPO 1997 10 26 04 33 95 3.4 -9 671.20 -54.9 -53.9 -53.1 66 -99 SPO 1997 10 26 04 34 98 3.5 -9 671.20 -54.9 -53.9 -53.2 66 -99 SPO 1997 10 26 04 35 101 3.4 -9 671.30 -54.7 -53.9 -53.2 64 -99 SPO 1997 10 26 04 36 103 3.5 -9 671.20 -54.9 -53.9 -53.4 66 -99 SPO 1997 10 26 04 37 104 3.5 -9 671.30 -54.9 -53.9 -53.5 65 -99 SPO 1997 10 26 04 38 103 3.4 -9 671.30 -55.0 -53.9 -53.5 66 -99 SPO 1997 10 26 04 39 103 3.6 -9 671.30 -55.0 -53.9 -53.5 66 -99 SPO 1997 10 26 04 40 100 3.5 -9 671.30 -55.0 -53.9 -53.5 66 -99 SPO 1997 10 26 04 41 99 3.5 -9 671.30 -55.0 -53.9 -53.4 66 -99 SPO 1997 10 26 04 42 100 3.6 -9 671.30 -55.0 -53.9 -53.4 66 -99 SPO 1997 10 26 04 43 102 3.9 -9 671.30 -55.0 -53.9 -53.5 64 -99 SPO 1997 10 26 04 44 101 3.8 -9 671.30 -55.0 -53.9 -53.6 66 -99 SPO 1997 10 26 04 45 99 4.1 -9 671.30 -54.9 -53.7 -53.6 65 -99 SPO 1997 10 26 04 46 97 4.0 -9 671.30 -54.7 -53.7 -53.6 63 -99 SPO 1997 10 26 04 47 95 4.2 -9 671.30 -54.9 -53.5 -53.6 65 -99 SPO 1997 10 26 04 48 95 4.3 -9 671.30 -54.7 -53.5 -53.6 64 -99 SPO 1997 10 26 04 49 94 4.4 -9 671.30 -54.7 -53.5 -53.6 64 -99 SPO 1997 10 26 04 50 95 4.4 -9 671.30 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 04 51 95 4.7 -9 671.30 -54.4 -53.5 -53.4 63 -99 SPO 1997 10 26 04 52 94 4.6 -9 671.30 -54.4 -53.4 -53.5 65 -99 SPO 1997 10 26 04 53 93 4.6 -9 671.30 -54.5 -53.4 -53.5 66 -99 SPO 1997 10 26 04 54 95 4.4 -9 671.30 -54.5 -53.5 -53.6 66 -99 SPO 1997 10 26 04 55 96 4.4 -9 671.30 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 04 56 94 4.6 -9 671.30 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 04 57 94 4.6 -9 671.30 -54.7 -53.5 -53.7 66 -99 SPO 1997 10 26 04 58 96 4.5 -9 671.30 -54.5 -53.5 -53.7 64 -99 SPO 1997 10 26 04 59 98 4.5 -9 671.30 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 05 00 100 4.4 -9 671.30 -54.5 -53.5 -53.7 64 0 SPO 1997 10 26 05 01 105 4.1 -9 671.40 -54.5 -53.5 -53.7 64 -99 SPO 1997 10 26 05 02 108 4.0 -9 671.40 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 05 03 109 3.6 -9 671.40 -54.7 -53.7 -54.0 66 -99 SPO 1997 10 26 05 04 110 3.6 -9 671.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 05 05 110 3.7 -9 671.40 -54.7 -53.7 -54.2 64 -99 SPO 1997 10 26 05 06 109 3.9 -9 671.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 05 07 108 3.9 -9 671.40 -54.7 -53.7 -54.0 64 -99 SPO 1997 10 26 05 08 107 3.8 -9 671.40 -54.7 -53.7 -53.9 64 -99 SPO 1997 10 26 05 09 109 3.8 -9 671.40 -54.7 -53.5 -53.9 63 -99 SPO 1997 10 26 05 10 108 3.8 -9 671.50 -54.7 -53.5 -53.9 63 -99 SPO 1997 10 26 05 11 109 3.9 -9 671.50 -54.5 -53.5 -53.9 62 -99 SPO 1997 10 26 05 12 109 4.1 -9 671.50 -54.5 -53.5 -54.0 62 -99 SPO 1997 10 26 05 13 105 3.9 -9 671.50 -54.5 -53.7 -53.9 62 -99 SPO 1997 10 26 05 14 104 3.9 -9 671.50 -54.5 -53.7 -53.8 64 -99 SPO 1997 10 26 05 15 104 4.0 -9 671.50 -54.5 -53.7 -53.7 64 -99 SPO 1997 10 26 05 16 102 4.0 -9 671.50 -54.5 -53.7 -53.7 64 -99 SPO 1997 10 26 05 17 100 4.1 -9 671.50 -54.5 -53.7 -53.7 64 -99 SPO 1997 10 26 05 18 100 4.0 -9 671.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 05 19 100 4.1 -9 671.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 05 20 100 4.1 -9 671.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 05 21 99 4.0 -9 671.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 05 22 100 4.0 -9 671.50 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 05 23 101 4.0 -9 671.50 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 05 24 100 4.1 -9 671.50 -54.7 -53.7 -53.7 64 -99 SPO 1997 10 26 05 25 99 4.1 -9 671.50 -54.7 -53.7 -53.7 63 -99 SPO 1997 10 26 05 26 99 4.3 -9 671.50 -54.7 -53.7 -53.7 64 -99 SPO 1997 10 26 05 27 99 4.3 -9 671.50 -54.7 -53.5 -53.7 63 -99 SPO 1997 10 26 05 28 101 4.3 -9 671.50 -54.7 -53.5 -53.8 63 -99 SPO 1997 10 26 05 29 100 4.4 -9 671.50 -54.7 -53.5 -53.8 63 -99 SPO 1997 10 26 05 30 100 4.3 -9 671.50 -54.7 -53.7 -53.7 64 -99 SPO 1997 10 26 05 31 101 4.2 -9 671.50 -54.7 -53.7 -53.8 64 -99 SPO 1997 10 26 05 32 99 4.4 -9 671.50 -54.7 -53.7 -53.8 64 -99 SPO 1997 10 26 05 33 99 4.3 -9 671.50 -54.9 -53.7 -53.8 66 -99 SPO 1997 10 26 05 34 97 4.4 -9 671.50 -54.9 -53.7 -53.8 65 -99 SPO 1997 10 26 05 35 96 4.5 -9 671.50 -54.7 -53.7 -53.8 63 -99 SPO 1997 10 26 05 36 95 4.6 -9 671.50 -54.7 -53.5 -53.8 63 -99 SPO 1997 10 26 05 37 94 4.6 -9 671.50 -54.7 -53.5 -53.8 63 -99 SPO 1997 10 26 05 38 94 4.6 -9 671.50 -54.7 -53.4 -53.8 63 -99 SPO 1997 10 26 05 39 94 4.6 -9 671.50 -54.7 -53.4 -53.8 63 -99 SPO 1997 10 26 05 40 95 4.7 -9 671.50 -54.7 -53.4 -53.8 63 -99 SPO 1997 10 26 05 41 94 4.9 -9 671.50 -54.7 -53.4 -53.8 64 -99 SPO 1997 10 26 05 42 93 4.8 -9 671.50 -54.7 -53.2 -53.8 66 -99 SPO 1997 10 26 05 43 93 4.8 -9 671.50 -54.7 -53.2 -53.8 66 -99 SPO 1997 10 26 05 44 94 4.7 -9 671.50 -54.7 -53.4 -53.7 66 -99 SPO 1997 10 26 05 45 94 4.8 -9 671.50 -54.5 -53.2 -53.7 64 -99 SPO 1997 10 26 05 46 95 4.6 -9 671.50 -54.5 -53.2 -53.7 64 -99 SPO 1997 10 26 05 47 96 4.7 -9 671.50 -54.7 -53.2 -53.7 66 -99 SPO 1997 10 26 05 48 96 4.7 -9 671.50 -54.7 -53.2 -53.7 66 -99 SPO 1997 10 26 05 49 96 4.6 -9 671.60 -54.7 -53.4 -53.7 64 -99 SPO 1997 10 26 05 50 96 4.4 -9 671.60 -54.7 -53.4 -53.7 64 -99 SPO 1997 10 26 05 51 95 4.3 -9 671.60 -54.7 -53.5 -53.6 63 -99 SPO 1997 10 26 05 52 95 4.3 -9 671.60 -54.5 -53.5 -53.6 62 -99 SPO 1997 10 26 05 53 94 4.1 -9 671.60 -54.5 -53.5 -53.6 62 -99 SPO 1997 10 26 05 54 95 4.2 -9 671.70 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 05 55 97 4.1 -9 671.70 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 05 56 97 4.0 -9 671.60 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 05 57 97 4.0 -9 671.70 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 05 58 98 4.1 -9 671.70 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 05 59 97 4.2 -9 671.70 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 06 00 96 4.2 -9 671.70 -54.5 -53.5 -53.5 64 0 SPO 1997 10 26 06 01 96 4.2 -9 671.70 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 02 95 4.2 -9 671.70 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 03 93 4.4 -9 671.70 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 04 93 4.4 -9 671.70 -54.5 -53.5 -53.5 63 -99 SPO 1997 10 26 06 05 91 4.5 -9 671.70 -54.5 -53.5 -53.4 63 -99 SPO 1997 10 26 06 06 91 4.5 -9 671.70 -54.5 -53.5 -53.4 63 -99 SPO 1997 10 26 06 07 91 4.7 -9 671.70 -54.5 -53.5 -53.5 63 -99 SPO 1997 10 26 06 08 91 4.9 -9 671.70 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 09 89 4.8 -9 671.80 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 10 90 4.9 -9 671.80 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 11 90 5.0 -9 671.80 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 12 91 5.0 -9 671.80 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 13 92 5.1 -9 671.80 -54.5 -53.5 -53.5 64 -99 SPO 1997 10 26 06 14 92 4.8 -9 671.80 -54.5 -53.4 -53.5 64 -99 SPO 1997 10 26 06 15 92 4.9 -9 671.80 -54.5 -53.4 -53.5 64 -99 SPO 1997 10 26 06 16 91 4.9 -9 671.80 -54.5 -53.4 -53.5 64 -99 SPO 1997 10 26 06 17 92 4.9 -9 671.80 -54.5 -53.4 -53.4 64 -99 SPO 1997 10 26 06 18 92 5.0 -9 671.80 -54.5 -53.4 -53.4 64 -99 SPO 1997 10 26 06 19 91 5.0 -9 671.80 -54.5 -53.4 -53.4 63 -99 SPO 1997 10 26 06 20 92 5.0 -9 671.80 -54.5 -53.4 -53.4 63 -99 SPO 1997 10 26 06 21 93 4.8 -9 671.80 -54.5 -53.4 -53.4 62 -99 SPO 1997 10 26 06 22 92 4.7 -9 671.80 -54.5 -53.4 -53.3 63 -99 SPO 1997 10 26 06 23 93 4.7 -9 671.80 -54.5 -53.5 -53.3 63 -99 SPO 1997 10 26 06 24 93 4.8 -9 671.80 -54.5 -53.5 -53.4 63 -99 SPO 1997 10 26 06 25 91 4.7 -9 671.80 -54.5 -53.4 -53.4 63 -99 SPO 1997 10 26 06 26 92 4.7 -9 671.80 -54.5 -53.4 -53.3 63 -99 SPO 1997 10 26 06 27 93 4.8 -9 671.80 -54.5 -53.4 -53.3 63 -99 SPO 1997 10 26 06 28 93 4.8 -9 671.80 -54.5 -53.4 -53.4 63 -99 SPO 1997 10 26 06 29 93 4.8 -9 671.80 -54.5 -53.4 -53.4 63 -99 SPO 1997 10 26 06 30 92 4.8 -9 671.80 -54.5 -53.4 -53.4 64 -99 SPO 1997 10 26 06 31 92 4.7 -9 671.80 -54.5 -53.2 -53.4 63 -99 SPO 1997 10 26 06 32 91 4.7 -9 671.80 -54.5 -53.2 -53.4 63 -99 SPO 1997 10 26 06 33 90 4.7 -9 671.80 -54.5 -53.2 -53.4 62 -99 SPO 1997 10 26 06 34 89 4.8 -9 671.80 -54.5 -53.2 -53.4 62 -99 SPO 1997 10 26 06 35 89 4.7 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 36 89 4.7 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 37 89 4.7 -9 671.80 -54.7 -53.2 -53.4 64 -99 SPO 1997 10 26 06 38 89 4.7 -9 671.80 -54.7 -53.0 -53.4 63 -99 SPO 1997 10 26 06 39 90 4.8 -9 671.80 -54.7 -53.0 -53.4 63 -99 SPO 1997 10 26 06 40 89 4.8 -9 671.80 -54.7 -53.0 -53.4 63 -99 SPO 1997 10 26 06 41 88 4.8 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 42 91 4.8 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 43 92 4.8 -9 671.80 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 06 44 93 4.9 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 45 93 4.8 -9 671.80 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 46 93 4.8 -9 671.80 -54.7 -53.2 -53.4 62 -99 SPO 1997 10 26 06 47 95 4.7 -9 671.80 -54.7 -53.2 -53.4 62 -99 SPO 1997 10 26 06 48 96 4.6 -9 671.80 -54.7 -53.2 -53.4 62 -99 SPO 1997 10 26 06 49 96 4.6 -9 671.80 -54.7 -53.2 -53.4 62 -99 SPO 1997 10 26 06 50 96 4.7 -9 671.90 -54.7 -53.2 -53.4 62 -99 SPO 1997 10 26 06 51 96 4.6 -9 671.90 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 06 52 96 4.6 -9 671.90 -54.7 -53.0 -53.3 63 -99 SPO 1997 10 26 06 53 96 4.5 -9 671.90 -54.7 -53.2 -53.3 63 -99 SPO 1997 10 26 06 54 96 4.4 -9 671.90 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 06 55 97 4.3 -9 671.90 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 06 56 98 4.2 -9 671.90 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 06 57 99 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 06 58 99 4.0 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 06 59 99 4.0 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 00 98 4.1 -9 672.00 -54.7 -53.4 -53.1 63 0 SPO 1997 10 26 07 01 98 4.2 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 02 98 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 03 97 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 04 97 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 05 98 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 06 97 4.1 -9 672.00 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 07 96 4.1 -9 672.10 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 08 96 4.0 -9 672.10 -54.7 -53.4 -53.1 63 -99 SPO 1997 10 26 07 09 96 4.0 -9 672.10 -54.9 -53.2 -53.1 65 -99 SPO 1997 10 26 07 10 96 4.0 -9 672.10 -54.9 -53.2 -53.0 65 -99 SPO 1997 10 26 07 11 96 4.0 -9 672.10 -54.9 -53.2 -53.0 65 -99 SPO 1997 10 26 07 12 96 4.1 -9 672.10 -54.9 -53.2 -53.1 65 -99 SPO 1997 10 26 07 13 94 4.1 -9 672.10 -54.9 -53.2 -53.1 65 -99 SPO 1997 10 26 07 14 95 4.0 -9 672.10 -54.9 -53.2 -53.1 63 -99 SPO 1997 10 26 07 15 95 4.0 -9 672.10 -55.0 -53.4 -53.1 64 -99 SPO 1997 10 26 07 16 93 4.1 -9 672.10 -55.0 -53.2 -53.2 64 -99 SPO 1997 10 26 07 17 92 4.2 -9 672.10 -55.0 -53.2 -53.2 64 -99 SPO 1997 10 26 07 18 92 4.2 -9 672.10 -55.0 -53.2 -53.2 64 -99 SPO 1997 10 26 07 19 91 4.1 -9 672.10 -55.0 -53.2 -53.2 64 -99 SPO 1997 10 26 07 20 93 4.0 -9 672.10 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 21 94 4.0 -9 672.10 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 22 95 4.0 -9 672.10 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 23 93 3.9 -9 672.20 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 24 92 4.0 -9 672.20 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 25 92 4.1 -9 672.20 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 26 92 4.3 -9 672.20 -55.0 -53.2 -53.2 66 -99 SPO 1997 10 26 07 27 90 4.3 -9 672.10 -55.0 -53.0 -53.2 66 -99 SPO 1997 10 26 07 28 88 4.5 -9 672.20 -54.9 -53.0 -53.2 63 -99 SPO 1997 10 26 07 29 87 4.5 -9 672.20 -54.7 -52.9 -53.2 62 -99 SPO 1997 10 26 07 30 86 4.4 -9 672.20 -54.7 -52.7 -53.1 62 -99 SPO 1997 10 26 07 31 85 4.5 -9 672.20 -54.7 -52.7 -53.1 62 -99 SPO 1997 10 26 07 32 86 4.5 -9 672.20 -54.7 -52.7 -53.1 62 -99 SPO 1997 10 26 07 33 85 4.5 -9 672.20 -54.7 -52.9 -53.1 62 -99 SPO 1997 10 26 07 34 85 4.5 -9 672.20 -54.7 -53.0 -53.1 63 -99 SPO 1997 10 26 07 35 83 4.6 -9 672.20 -54.7 -52.9 -53.1 63 -99 SPO 1997 10 26 07 36 84 4.5 -9 672.20 -54.5 -53.0 -53.1 62 -99 SPO 1997 10 26 07 37 85 4.5 -9 672.20 -54.7 -53.0 -53.2 64 -99 SPO 1997 10 26 07 38 85 4.6 -9 672.20 -54.5 -53.0 -53.1 63 -99 SPO 1997 10 26 07 39 86 4.6 -9 672.20 -54.7 -53.0 -53.2 66 -99 SPO 1997 10 26 07 40 87 4.8 -9 672.20 -54.7 -53.0 -53.2 66 -99 SPO 1997 10 26 07 41 87 4.8 -9 672.20 -54.5 -53.0 -53.2 63 -99 SPO 1997 10 26 07 42 87 4.8 -9 672.20 -54.5 -53.0 -53.2 63 -99 SPO 1997 10 26 07 43 86 4.8 -9 672.20 -54.7 -53.0 -53.3 64 -99 SPO 1997 10 26 07 44 88 4.8 -9 672.20 -54.7 -53.0 -53.3 63 -99 SPO 1997 10 26 07 45 88 4.8 -9 672.10 -54.5 -53.0 -53.3 62 -99 SPO 1997 10 26 07 46 87 4.8 -9 672.20 -54.5 -53.0 -53.2 62 -99 SPO 1997 10 26 07 47 87 4.8 -9 672.20 -54.5 -53.0 -53.2 63 -99 SPO 1997 10 26 07 48 87 4.7 -9 672.20 -54.7 -53.0 -53.2 64 -99 SPO 1997 10 26 07 49 87 4.7 -9 672.20 -54.5 -53.0 -53.2 63 -99 SPO 1997 10 26 07 50 88 4.7 -9 672.10 -54.5 -53.0 -53.3 64 -99 SPO 1997 10 26 07 51 88 4.8 -9 672.10 -54.7 -53.0 -53.3 64 -99 SPO 1997 10 26 07 52 87 4.7 -9 672.20 -54.7 -53.0 -53.3 64 -99 SPO 1997 10 26 07 53 87 4.8 -9 672.20 -54.7 -53.2 -53.3 64 -99 SPO 1997 10 26 07 54 87 4.8 -9 672.20 -54.7 -53.2 -53.3 64 -99 SPO 1997 10 26 07 55 86 4.9 -9 672.20 -54.9 -53.0 -53.3 65 -99 SPO 1997 10 26 07 56 85 4.9 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 07 57 86 4.8 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 07 58 85 4.8 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 07 59 85 5.0 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 00 85 5.0 -9 672.20 -54.7 -53.0 -53.4 63 0 SPO 1997 10 26 08 01 86 5.0 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 02 87 4.9 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 03 86 5.0 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 04 85 5.0 -9 672.20 -54.9 -53.2 -53.5 65 -99 SPO 1997 10 26 08 05 84 5.0 -9 672.20 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 06 84 5.0 -9 672.20 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 07 85 5.0 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 08 83 4.9 -9 672.20 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 09 82 4.8 -9 672.20 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 10 82 4.9 -9 672.20 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 11 81 4.7 -9 672.30 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 12 81 4.6 -9 672.30 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 13 81 4.6 -9 672.30 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 14 81 4.5 -9 672.30 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 15 83 4.5 -9 672.30 -54.5 -53.2 -53.3 62 -99 SPO 1997 10 26 08 16 83 4.4 -9 672.30 -54.7 -53.2 -53.2 64 -99 SPO 1997 10 26 08 17 83 4.3 -9 672.30 -54.5 -53.2 -53.2 63 -99 SPO 1997 10 26 08 18 82 4.3 -9 672.30 -54.7 -53.2 -53.2 64 -99 SPO 1997 10 26 08 19 83 4.3 -9 672.30 -54.5 -53.2 -53.3 63 -99 SPO 1997 10 26 08 20 84 4.4 -9 672.30 -54.7 -53.2 -53.3 66 -99 SPO 1997 10 26 08 21 84 4.4 -9 672.30 -54.7 -53.2 -53.2 66 -99 SPO 1997 10 26 08 22 84 4.5 -9 672.30 -54.7 -53.2 -53.2 66 -99 SPO 1997 10 26 08 23 82 4.4 -9 672.30 -54.7 -53.2 -53.3 64 -99 SPO 1997 10 26 08 24 80 4.5 -9 672.30 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 25 80 4.5 -9 672.40 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 26 80 4.5 -9 672.40 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 27 81 4.6 -9 672.40 -54.7 -53.2 -53.5 63 -99 SPO 1997 10 26 08 28 81 4.6 -9 672.40 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 29 82 4.5 -9 672.40 -54.7 -53.2 -53.4 63 -99 SPO 1997 10 26 08 30 83 4.5 -9 672.40 -54.7 -53.2 -53.3 64 -99 SPO 1997 10 26 08 31 84 4.4 -9 672.40 -54.7 -53.2 -53.2 64 -99 SPO 1997 10 26 08 32 85 4.3 -9 672.40 -54.7 -53.2 -53.2 64 -99 SPO 1997 10 26 08 33 86 4.4 -9 672.40 -54.7 -53.2 -53.2 64 -99 SPO 1997 10 26 08 34 86 4.4 -9 672.40 -54.9 -53.2 -53.2 66 -99 SPO 1997 10 26 08 35 87 4.3 -9 672.40 -54.9 -53.0 -53.2 65 -99 SPO 1997 10 26 08 36 86 4.4 -9 672.40 -54.7 -53.0 -53.3 63 -99 SPO 1997 10 26 08 37 87 4.4 -9 672.40 -54.7 -53.2 -53.3 63 -99 SPO 1997 10 26 08 38 88 4.5 -9 672.40 -54.7 -53.2 -53.3 63 -99 SPO 1997 10 26 08 39 88 4.4 -9 672.40 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 08 40 88 4.4 -9 672.40 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 08 41 87 4.5 -9 672.40 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 08 42 88 4.4 -9 672.40 -54.7 -53.2 -53.2 63 -99 SPO 1997 10 26 08 43 88 4.3 -9 672.40 -54.9 -53.2 -53.2 65 -99 SPO 1997 10 26 08 44 90 4.1 -9 672.40 -54.9 -53.2 -53.2 65 -99 SPO 1997 10 26 08 45 91 4.0 -9 672.40 -54.9 -53.2 -53.2 63 -99 SPO 1997 10 26 08 46 91 4.0 -9 672.40 -55.0 -53.4 -53.2 64 -99 SPO 1997 10 26 08 47 90 4.1 -9 672.50 -55.0 -53.5 -53.2 64 -99 SPO 1997 10 26 08 48 90 4.2 -9 672.40 -55.0 -53.5 -53.3 64 -99 SPO 1997 10 26 08 49 89 4.3 -9 672.40 -55.0 -53.4 -53.3 64 -99 SPO 1997 10 26 08 50 88 4.4 -9 672.40 -55.0 -53.4 -53.3 64 -99 SPO 1997 10 26 08 51 87 4.4 -9 672.40 -55.0 -53.4 -53.3 62 -99 SPO 1997 10 26 08 52 86 4.5 -9 672.40 -55.0 -53.4 -53.4 62 -99 SPO 1997 10 26 08 53 86 4.5 -9 672.40 -55.0 -53.4 -53.4 62 -99 SPO 1997 10 26 08 54 87 4.5 -9 672.40 -55.0 -53.4 -53.4 62 -99 SPO 1997 10 26 08 55 88 4.7 -9 672.40 -55.0 -53.4 -53.4 64 -99 SPO 1997 10 26 08 56 88 4.6 -9 672.40 -55.0 -53.4 -53.4 64 -99 SPO 1997 10 26 08 57 88 4.5 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 08 58 88 4.5 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 08 59 87 4.6 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 09 00 87 4.5 -9 672.40 -55.0 -53.2 -53.4 64 0 SPO 1997 10 26 09 01 88 4.5 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 09 02 90 4.3 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 09 03 91 4.2 -9 672.40 -55.0 -53.2 -53.4 64 -99 SPO 1997 10 26 09 04 92 4.0 -9 672.40 -55.0 -53.4 -53.3 64 -99 SPO 1997 10 26 09 05 92 3.9 -9 672.40 -55.0 -53.4 -53.3 62 -99 SPO 1997 10 26 09 06 93 3.9 -9 672.40 -55.0 -53.4 -53.3 62 -99 SPO 1997 10 26 09 07 93 3.9 -9 672.40 -55.0 -53.4 -53.3 62 -99 SPO 1997 10 26 09 08 95 3.9 -9 672.50 -55.0 -53.4 -53.3 64 -99 SPO 1997 10 26 09 09 94 3.9 -9 672.50 -55.0 -53.2 -53.3 64 -99 SPO 1997 10 26 09 10 93 3.6 -9 672.50 -55.0 -53.2 -53.3 64 -99 SPO 1997 10 26 09 11 92 3.7 -9 672.50 -55.0 -53.4 -53.2 64 -99 SPO 1997 10 26 09 12 92 3.7 -9 672.50 -54.9 -53.4 -53.1 65 -99 SPO 1997 10 26 09 13 93 3.7 -9 672.50 -54.9 -53.4 -53.0 65 -99 SPO 1997 10 26 09 14 91 3.6 -9 672.50 -54.7 -53.4 -53.0 63 -99 SPO 1997 10 26 09 15 91 3.7 -9 672.50 -54.7 -53.4 -52.9 64 -99 SPO 1997 10 26 09 16 90 3.6 -9 672.60 -54.5 -53.4 -52.9 64 -99 SPO 1997 10 26 09 17 89 3.7 -9 672.60 -54.7 -53.4 -52.8 66 -99 SPO 1997 10 26 09 18 89 3.9 -9 672.60 -54.7 -53.4 -52.9 66 -99 SPO 1997 10 26 09 19 91 4.0 -9 672.60 -54.5 -53.4 -52.9 64 -99 SPO 1997 10 26 09 20 90 3.8 -9 672.50 -54.5 -53.4 -52.9 64 -99 SPO 1997 10 26 09 21 87 4.0 -9 672.60 -54.5 -53.4 -52.9 64 -99 SPO 1997 10 26 09 22 86 3.8 -9 672.60 -54.5 -53.4 -52.9 64 -99 SPO 1997 10 26 09 23 86 4.0 -9 672.60 -54.5 -53.4 -52.8 64 -99 SPO 1997 10 26 09 24 87 4.0 -9 672.60 -54.5 -53.4 -52.8 66 -99 SPO 1997 10 26 09 25 89 3.9 -9 672.60 -54.5 -53.5 -52.8 66 -99 SPO 1997 10 26 09 26 91 4.0 -9 672.60 -54.5 -53.5 -52.8 66 -99 SPO 1997 10 26 09 27 91 3.9 -9 672.50 -54.5 -53.4 -52.9 66 -99 SPO 1997 10 26 09 28 89 3.8 -9 672.50 -54.5 -53.5 -52.8 66 -99 SPO 1997 10 26 09 29 92 3.7 -9 672.50 -54.5 -53.5 -52.8 66 -99 SPO 1997 10 26 09 30 91 3.7 -9 672.50 -54.5 -53.5 -52.9 66 -99 SPO 1997 10 26 09 31 91 3.8 -9 672.50 -54.5 -53.5 -52.9 66 -99 SPO 1997 10 26 09 32 91 3.8 -9 672.50 -54.7 -53.5 -52.9 66 -99 SPO 1997 10 26 09 33 91 3.9 -9 672.50 -54.7 -53.5 -53.0 64 -99 SPO 1997 10 26 09 34 90 4.0 -9 672.50 -54.7 -53.5 -53.0 64 -99 SPO 1997 10 26 09 35 92 4.1 -9 672.50 -54.7 -53.5 -53.0 64 -99 SPO 1997 10 26 09 36 93 4.0 -9 672.50 -54.7 -53.4 -53.1 64 -99 SPO 1997 10 26 09 37 93 4.3 -9 672.50 -54.9 -53.4 -53.2 66 -99 SPO 1997 10 26 09 38 94 4.4 -9 672.50 -54.7 -53.4 -53.2 64 -99 SPO 1997 10 26 09 39 95 4.4 -9 672.50 -54.7 -53.4 -53.3 63 -99 SPO 1997 10 26 09 40 97 4.3 -9 672.50 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 09 41 99 4.1 -9 672.50 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 09 42 101 4.2 -9 672.50 -54.7 -53.7 -53.2 63 -99 SPO 1997 10 26 09 43 102 4.2 -9 672.40 -54.7 -53.7 -53.4 63 -99 SPO 1997 10 26 09 44 102 4.1 -9 672.40 -55.0 -53.7 -53.4 66 -99 SPO 1997 10 26 09 45 100 3.9 -9 672.40 -55.0 -53.7 -53.4 66 -99 SPO 1997 10 26 09 46 99 4.0 -9 672.50 -55.0 -53.7 -53.4 64 -99 SPO 1997 10 26 09 47 99 4.0 -9 672.40 -54.9 -53.7 -53.4 63 -99 SPO 1997 10 26 09 48 98 4.0 -9 672.40 -55.0 -53.7 -53.4 64 -99 SPO 1997 10 26 09 49 97 4.1 -9 672.40 -55.0 -53.7 -53.4 64 -99 SPO 1997 10 26 09 50 97 4.1 -9 672.50 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 51 96 4.2 -9 672.50 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 52 96 4.2 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 53 95 4.1 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 54 94 4.1 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 55 94 4.2 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 56 94 4.2 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 57 94 4.2 -9 672.40 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 58 95 4.1 -9 672.50 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 09 59 95 4.1 -9 672.50 -55.0 -53.5 -53.4 64 -99 SPO 1997 10 26 10 00 96 4.0 -9 672.50 -54.9 -53.7 -53.4 63 0 SPO 1997 10 26 10 01 97 3.9 -9 672.50 -54.9 -53.7 -53.3 63 -99 SPO 1997 10 26 10 02 96 3.7 -9 672.50 -54.9 -53.7 -53.3 63 -99 SPO 1997 10 26 10 03 95 3.6 -9 672.50 -54.9 -53.7 -53.2 63 -99 SPO 1997 10 26 10 04 93 3.6 -9 672.50 -55.0 -53.5 -53.2 64 -99 SPO 1997 10 26 10 05 92 3.5 -9 672.50 -54.9 -53.5 -53.1 65 -99 SPO 1997 10 26 10 06 93 3.5 -9 672.50 -54.9 -53.5 -53.1 65 -99 SPO 1997 10 26 10 07 94 3.7 -9 672.50 -54.9 -53.5 -53.1 65 -99 SPO 1997 10 26 10 08 94 3.9 -9 672.60 -54.9 -53.5 -53.1 65 -99 SPO 1997 10 26 10 09 93 3.9 -9 672.60 -54.9 -53.5 -53.2 65 -99 SPO 1997 10 26 10 10 93 3.9 -9 672.60 -54.9 -53.5 -53.2 65 -99 SPO 1997 10 26 10 11 93 4.0 -9 672.60 -54.7 -53.5 -53.2 64 -99 SPO 1997 10 26 10 12 93 4.0 -9 672.60 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 10 13 94 4.0 -9 672.60 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 10 14 93 4.1 -9 672.60 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 10 15 94 4.0 -9 672.60 -54.7 -53.5 -53.2 63 -99 SPO 1997 10 26 10 16 93 3.8 -9 672.60 -54.7 -53.5 -53.2 64 -99 SPO 1997 10 26 10 17 91 3.7 -9 672.60 -54.7 -53.5 -53.1 64 -99 SPO 1997 10 26 10 18 92 3.7 -9 672.60 -54.7 -53.5 -53.0 64 -99 SPO 1997 10 26 10 19 94 3.8 -9 672.60 -54.7 -53.7 -53.1 64 -99 SPO 1997 10 26 10 20 94 3.8 -9 672.60 -54.7 -53.7 -53.1 64 -99 SPO 1997 10 26 10 21 94 3.7 -9 672.70 -54.7 -53.7 -53.1 66 -99 SPO 1997 10 26 10 22 93 3.8 -9 672.70 -54.7 -53.7 -53.1 66 -99 SPO 1997 10 26 10 23 92 3.8 -9 672.70 -54.7 -53.7 -53.1 66 -99 SPO 1997 10 26 10 24 91 3.8 -9 672.70 -54.7 -53.7 -53.1 66 -99 SPO 1997 10 26 10 25 92 3.8 -9 672.70 -54.7 -53.7 -53.2 66 -99 SPO 1997 10 26 10 26 93 3.8 -9 672.70 -54.7 -53.7 -53.2 66 -99 SPO 1997 10 26 10 27 93 3.8 -9 672.70 -54.7 -53.7 -53.2 64 -99 SPO 1997 10 26 10 28 93 3.6 -9 672.70 -54.7 -53.7 -53.2 63 -99 SPO 1997 10 26 10 29 90 3.6 -9 672.70 -54.7 -53.7 -53.1 63 -99 SPO 1997 10 26 10 30 89 3.5 -9 672.70 -54.9 -53.7 -53.1 65 -99 SPO 1997 10 26 10 31 88 3.5 -9 672.70 -54.9 -53.7 -53.1 65 -99 SPO 1997 10 26 10 32 87 3.4 -9 672.80 -54.9 -53.7 -53.0 66 -99 SPO 1997 10 26 10 33 88 3.3 -9 672.80 -54.9 -53.7 -53.0 67 -99 SPO 1997 10 26 10 34 90 3.3 -9 672.80 -54.9 -53.7 -53.0 67 -99 SPO 1997 10 26 10 35 90 3.3 -9 672.80 -54.9 -53.7 -53.0 67 -99 SPO 1997 10 26 10 36 91 3.4 -9 672.80 -54.9 -53.7 -53.0 66 -99 SPO 1997 10 26 10 37 92 3.2 -9 672.80 -54.9 -53.7 -52.9 66 -99 SPO 1997 10 26 10 38 91 3.2 -9 672.80 -54.9 -53.7 -52.8 67 -99 SPO 1997 10 26 10 39 91 3.1 -9 672.80 -54.9 -53.7 -52.8 67 -99 SPO 1997 10 26 10 40 93 3.1 -9 672.80 -54.7 -53.7 -52.8 64 -99 SPO 1997 10 26 10 41 95 3.0 -9 672.80 -54.7 -53.7 -52.8 64 -99 SPO 1997 10 26 10 42 96 3.2 -9 672.80 -54.7 -53.7 -52.8 64 -99 SPO 1997 10 26 10 43 96 3.1 -9 672.80 -54.7 -53.7 -52.9 64 -99 SPO 1997 10 26 10 44 95 3.1 -9 672.90 -54.7 -53.7 -52.8 63 -99 SPO 1997 10 26 10 45 96 3.2 -9 672.90 -54.7 -53.7 -52.8 63 -99 SPO 1997 10 26 10 46 98 3.1 -9 672.90 -54.7 -53.7 -52.8 64 -99 SPO 1997 10 26 10 47 100 3.1 -9 672.90 -54.9 -53.7 -52.9 66 -99 SPO 1997 10 26 10 48 100 3.2 -9 672.90 -54.9 -53.7 -52.9 66 -99 SPO 1997 10 26 10 49 98 3.1 -9 672.90 -54.9 -53.7 -52.9 66 -99 SPO 1997 10 26 10 50 96 2.9 -9 672.90 -54.9 -53.7 -52.8 67 -99 SPO 1997 10 26 10 51 98 2.9 -9 672.90 -54.7 -53.7 -52.7 66 -99 SPO 1997 10 26 10 52 98 3.0 -9 672.90 -54.7 -53.9 -52.7 66 -99 SPO 1997 10 26 10 53 98 2.9 -9 672.90 -54.7 -53.9 -52.7 66 -99 SPO 1997 10 26 10 54 99 3.0 -9 672.90 -54.9 -53.9 -52.7 67 -99 SPO 1997 10 26 10 55 99 3.1 -9 672.90 -54.9 -53.9 -52.7 67 -99 SPO 1997 10 26 10 56 99 3.1 -9 672.90 -54.9 -53.9 -52.8 67 -99 SPO 1997 10 26 10 57 99 3.2 -9 672.90 -54.9 -53.9 -52.8 67 -99 SPO 1997 10 26 10 58 99 3.3 -9 672.90 -54.9 -53.9 -53.0 67 -99 SPO 1997 10 26 10 59 99 3.4 -9 672.90 -54.9 -53.7 -53.0 65 -99 SPO 1997 10 26 11 00 99 3.3 -9 672.90 -54.9 -53.7 -53.0 65 0 SPO 1997 10 26 11 01 99 3.3 -9 672.90 -55.0 -53.7 -53.0 66 -99 SPO 1997 10 26 11 02 103 3.5 -9 672.90 -54.9 -53.7 -53.0 65 -99 SPO 1997 10 26 11 03 105 3.5 -9 672.90 -54.9 -53.9 -53.3 65 -99 SPO 1997 10 26 11 04 106 3.5 -9 672.90 -54.9 -53.9 -53.5 65 -99 SPO 1997 10 26 11 05 106 3.4 -9 672.90 -55.0 -54.0 -53.6 66 -99 SPO 1997 10 26 11 06 105 3.5 -9 672.90 -55.0 -53.9 -53.6 68 -99 SPO 1997 10 26 11 07 105 3.8 -9 672.90 -55.0 -53.9 -53.6 68 -99 SPO 1997 10 26 11 08 104 4.0 -9 672.90 -55.0 -53.7 -53.7 68 -99 SPO 1997 10 26 11 09 103 4.2 -9 672.90 -55.0 -53.7 -53.8 68 -99 SPO 1997 10 26 11 10 103 4.4 -9 672.90 -55.0 -53.7 -53.8 68 -99 SPO 1997 10 26 11 11 103 4.6 -9 672.90 -55.0 -53.7 -53.7 68 -99 SPO 1997 10 26 11 12 102 4.6 -9 672.90 -54.9 -53.7 -53.7 66 -99 SPO 1997 10 26 11 13 101 4.6 -9 672.90 -54.9 -53.7 -53.6 66 -99 SPO 1997 10 26 11 14 101 4.6 -9 672.90 -54.9 -53.7 -53.6 66 -99 SPO 1997 10 26 11 15 102 4.4 -9 672.90 -54.9 -53.7 -53.6 65 -99 SPO 1997 10 26 11 16 101 4.4 -9 672.90 -54.9 -53.7 -53.6 65 -99 SPO 1997 10 26 11 17 101 4.3 -9 672.90 -54.9 -53.7 -53.6 66 -99 SPO 1997 10 26 11 18 102 4.3 -9 672.90 -54.9 -53.9 -53.6 66 -99 SPO 1997 10 26 11 19 103 4.3 -9 672.90 -54.9 -53.9 -53.7 66 -99 SPO 1997 10 26 11 20 104 4.3 -9 672.90 -54.9 -53.9 -53.8 66 -99 SPO 1997 10 26 11 21 104 4.2 -9 672.90 -54.9 -54.0 -53.8 66 -99 SPO 1997 10 26 11 22 104 4.2 -9 672.90 -54.9 -54.0 -53.8 66 -99 SPO 1997 10 26 11 23 106 4.3 -9 672.90 -54.9 -54.0 -53.9 66 -99 SPO 1997 10 26 11 24 107 4.3 -9 672.90 -55.0 -54.0 -54.0 66 -99 SPO 1997 10 26 11 25 107 4.2 -9 672.90 -55.0 -54.0 -54.0 66 -99 SPO 1997 10 26 11 26 108 4.2 -9 673.00 -55.0 -54.2 -54.1 66 -99 SPO 1997 10 26 11 27 109 4.2 -9 673.00 -55.0 -54.2 -54.1 66 -99 SPO 1997 10 26 11 28 109 4.3 -9 673.00 -55.0 -54.2 -54.2 64 -99 SPO 1997 10 26 11 29 108 4.4 -9 673.00 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 26 11 30 107 4.3 -9 673.00 -55.0 -54.0 -54.1 66 -99 SPO 1997 10 26 11 31 108 3.9 -9 673.00 -55.0 -54.2 -54.1 66 -99 SPO 1997 10 26 11 32 111 4.0 -9 673.10 -55.0 -54.2 -54.2 66 -99 SPO 1997 10 26 11 33 112 4.0 -9 673.10 -55.0 -54.2 -54.2 66 -99 SPO 1997 10 26 11 34 112 3.8 -9 673.10 -55.0 -54.2 -54.3 66 -99 SPO 1997 10 26 11 35 110 3.8 -9 673.10 -55.2 -54.2 -54.3 67 -99 SPO 1997 10 26 11 36 108 3.8 -9 673.10 -55.2 -54.0 -54.2 67 -99 SPO 1997 10 26 11 37 107 3.7 -9 673.10 -55.0 -54.2 -54.1 66 -99 SPO 1997 10 26 11 38 105 3.6 -9 673.10 -55.0 -54.2 -54.0 66 -99 SPO 1997 10 26 11 39 105 3.6 -9 673.10 -55.0 -54.0 -53.9 66 -99 SPO 1997 10 26 11 40 105 3.9 -9 673.10 -55.0 -54.2 -53.8 66 -99 SPO 1997 10 26 11 41 106 3.8 -9 673.10 -55.0 -54.2 -53.9 66 -99 SPO 1997 10 26 11 42 105 4.0 -9 673.10 -54.9 -54.2 -53.8 65 -99 SPO 1997 10 26 11 43 105 4.1 -9 673.10 -55.0 -54.2 -53.8 66 -99 SPO 1997 10 26 11 44 103 4.2 -9 673.10 -55.0 -54.0 -53.9 66 -99 SPO 1997 10 26 11 45 101 4.2 -9 673.10 -55.0 -54.0 -53.8 66 -99 SPO 1997 10 26 11 46 100 4.3 -9 673.10 -55.0 -53.9 -53.8 66 -99 SPO 1997 10 26 11 47 100 4.3 -9 673.10 -55.0 -53.9 -53.8 66 -99 SPO 1997 10 26 11 48 101 4.1 -9 673.10 -54.9 -53.9 -53.8 65 -99 SPO 1997 10 26 11 49 102 3.9 -9 673.10 -54.9 -54.0 -53.7 66 -99 SPO 1997 10 26 11 50 103 3.8 -9 673.10 -54.9 -54.0 -53.7 66 -99 SPO 1997 10 26 11 51 104 3.7 -9 673.20 -54.9 -54.0 -53.8 66 -99 SPO 1997 10 26 11 52 106 3.9 -9 673.20 -55.0 -54.0 -53.9 66 -99 SPO 1997 10 26 11 53 107 4.0 -9 673.20 -55.0 -54.0 -54.0 66 -99 SPO 1997 10 26 11 54 108 4.1 -9 673.20 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 26 11 55 107 4.3 -9 673.20 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 26 11 56 107 4.4 -9 673.20 -55.0 -53.9 -54.1 66 -99 SPO 1997 10 26 11 57 108 4.5 -9 673.20 -55.0 -53.9 -54.1 64 -99 SPO 1997 10 26 11 58 108 4.6 -9 673.20 -55.0 -53.9 -54.1 64 -99 SPO 1997 10 26 11 59 107 4.7 -9 673.20 -55.0 -53.9 -54.1 66 -99 SPO 1997 10 26 12 00 107 4.6 -9 673.20 -55.0 -53.9 -54.1 66 0 SPO 1997 10 26 12 01 107 4.6 -9 673.20 -55.0 -53.9 -54.1 66 -99 SPO 1997 10 26 12 02 110 4.5 -9 673.20 -55.0 -53.9 -54.1 66 -99 SPO 1997 10 26 12 03 110 4.4 -9 673.20 -55.0 -53.7 -54.2 66 -99 SPO 1997 10 26 12 04 109 4.3 -9 673.20 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 26 12 05 111 4.2 -9 673.30 -55.0 -53.7 -54.2 66 -99 SPO 1997 10 26 12 06 111 4.2 -9 673.30 -55.0 -53.9 -54.3 66 -99 SPO 1997 10 26 12 07 111 4.2 -9 673.30 -55.0 -54.0 -54.3 66 -99 SPO 1997 10 26 12 08 108 4.3 -9 673.30 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 26 12 09 107 4.3 -9 673.30 -55.0 -54.0 -54.1 66 -99 SPO 1997 10 26 12 10 105 4.4 -9 673.30 -55.0 -54.0 -54.1 64 -99 SPO 1997 10 26 12 11 104 4.4 -9 673.30 -54.9 -54.0 -54.0 63 -99 SPO 1997 10 26 12 12 104 4.5 -9 673.30 -54.9 -54.0 -53.9 65 -99 SPO 1997 10 26 12 13 104 4.4 -9 673.30 -55.0 -54.0 -54.0 66 -99 SPO 1997 10 26 12 14 102 4.5 -9 673.30 -55.0 -54.0 -54.0 66 -99 SPO 1997 10 26 12 15 102 4.6 -9 673.30 -55.0 -54.0 -54.0 68 -99 SPO 1997 10 26 12 16 103 4.7 -9 673.30 -55.0 -54.0 -54.0 68 -99 SPO 1997 10 26 12 17 103 4.8 -9 673.30 -55.0 -54.0 -54.1 68 -99 SPO 1997 10 26 12 18 105 4.8 -9 673.30 -55.0 -54.0 -54.1 66 -99 SPO 1997 10 26 12 19 103 4.7 -9 673.30 -55.0 -54.0 -54.1 66 -99 SPO 1997 10 26 12 20 104 4.6 -9 673.30 -55.0 -54.0 -54.2 68 -99 SPO 1997 10 26 12 21 104 4.7 -9 673.30 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 26 12 22 104 4.8 -9 673.40 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 26 12 23 105 4.7 -9 673.40 -55.0 -54.0 -54.2 66 -99 SPO 1997 10 26 12 24 104 4.8 -9 673.40 -55.0 -53.9 -54.2 66 -99 SPO 1997 10 26 12 25 104 5.0 -9 673.40 -55.0 -53.9 -54.2 64 -99 SPO 1997 10 26 12 26 103 5.0 -9 673.40 -54.9 -53.9 -54.1 65 -99 SPO 1997 10 26 12 27 102 5.1 -9 673.40 -54.9 -53.9 -54.1 65 -99 SPO 1997 10 26 12 28 101 5.2 -9 673.40 -55.0 -53.9 -54.1 66 -99 SPO 1997 10 26 12 29 100 5.1 -9 673.40 -54.9 -53.9 -54.2 66 -99 SPO 1997 10 26 12 30 100 5.5 -9 673.30 -54.9 -53.9 -54.1 67 -99 SPO 1997 10 26 12 31 100 5.2 -9 673.30 -54.7 -53.9 -54.1 66 -99 SPO 1997 10 26 12 32 100 5.4 -9 673.30 -54.7 -53.9 -54.1 66 -99 SPO 1997 10 26 12 33 99 5.4 -9 673.30 -54.9 -53.9 -54.1 67 -99 SPO 1997 10 26 12 34 99 5.4 -9 673.30 -54.7 -53.7 -54.1 66 -99 SPO 1997 10 26 12 35 99 5.2 -9 673.30 -54.7 -53.7 -54.1 66 -99 SPO 1997 10 26 12 36 100 5.2 -9 673.40 -54.7 -53.7 -54.1 66 -99 SPO 1997 10 26 12 37 103 5.1 -9 673.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 38 105 5.0 -9 673.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 39 105 4.9 -9 673.40 -54.9 -53.7 -54.2 66 -99 SPO 1997 10 26 12 40 106 5.0 -9 673.40 -54.9 -53.7 -54.2 66 -99 SPO 1997 10 26 12 41 106 5.0 -9 673.40 -54.7 -53.7 -54.2 64 -99 SPO 1997 10 26 12 42 105 5.0 -9 673.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 43 104 4.9 -9 673.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 44 103 5.0 -9 673.40 -54.9 -53.7 -54.1 66 -99 SPO 1997 10 26 12 45 103 4.8 -9 673.50 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 46 104 5.0 -9 673.40 -54.7 -53.7 -54.1 64 -99 SPO 1997 10 26 12 47 105 5.0 -9 673.40 -54.7 -53.7 -54.1 66 -99 SPO 1997 10 26 12 48 104 5.1 -9 673.40 -54.7 -53.7 -54.1 66 -99 SPO 1997 10 26 12 49 103 5.1 -9 673.40 -54.7 -53.5 -54.0 64 -99 SPO 1997 10 26 12 50 104 5.3 -9 673.40 -54.7 -53.5 -54.0 64 -99 SPO 1997 10 26 12 51 104 5.1 -9 673.40 -54.7 -53.5 -54.0 64 -99 SPO 1997 10 26 12 52 104 5.0 -9 673.40 -54.7 -53.5 -54.0 66 -99 SPO 1997 10 26 12 53 102 4.9 -9 673.50 -54.7 -53.7 -54.0 66 -99 SPO 1997 10 26 12 54 102 4.7 -9 673.50 -54.7 -53.7 -54.0 66 -99 SPO 1997 10 26 12 55 101 4.6 -9 673.50 -54.7 -53.7 -53.9 66 -99 SPO 1997 10 26 12 56 99 4.5 -9 673.50 -54.7 -53.7 -53.9 66 -99 SPO 1997 10 26 12 57 98 4.3 -9 673.60 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 12 58 97 4.2 -9 673.60 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 12 59 98 4.2 -9 673.60 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 13 00 96 3.9 -9 673.60 -54.7 -53.7 -53.8 66 0 SPO 1997 10 26 13 01 95 4.0 -9 673.60 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 13 02 93 4.0 -9 673.60 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 13 03 92 3.8 -9 673.60 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 13 04 94 4.0 -9 673.60 -54.7 -53.7 -53.6 66 -99 SPO 1997 10 26 13 05 96 4.1 -9 673.50 -54.7 -53.7 -53.7 66 -99 SPO 1997 10 26 13 06 97 4.1 -9 673.50 -54.7 -53.7 -53.6 66 -99 SPO 1997 10 26 13 07 97 3.8 -9 673.50 -54.7 -53.7 -53.6 66 -99 SPO 1997 10 26 13 08 97 3.8 -9 673.50 -54.7 -53.7 -53.6 66 -99 SPO 1997 10 26 13 09 96 3.9 -9 673.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 13 10 98 4.1 -9 673.50 -54.5 -53.7 -53.6 64 -99 SPO 1997 10 26 13 11 98 4.0 -9 673.50 -54.7 -53.7 -53.6 66 -99 SPO 1997 10 26 13 12 97 3.8 -9 673.50 -54.7 -53.9 -53.6 66 -99 SPO 1997 10 26 13 13 95 3.8 -9 673.50 -54.7 -53.9 -53.6 66 -99 SPO 1997 10 26 13 14 96 3.6 -9 673.50 -54.7 -53.9 -53.5 67 -99 SPO 1997 10 26 13 15 98 3.5 -9 673.50 -54.5 -53.9 -53.5 66 -99 SPO 1997 10 26 13 16 97 3.3 -9 673.50 -54.5 -53.9 -53.4 64 -99 SPO 1997 10 26 13 17 99 2.9 -9 673.50 -54.5 -54.0 -53.4 64 -99 SPO 1997 10 26 13 18 103 3.3 -9 673.50 -54.5 -54.0 -53.3 64 -99 SPO 1997 10 26 13 19 105 3.1 -9 673.50 -54.5 -54.0 -53.4 64 -99 SPO 1997 10 26 13 20 103 3.2 -9 673.50 -54.5 -54.0 -53.5 64 -99 SPO 1997 10 26 13 21 103 3.2 -9 673.50 -54.5 -53.9 -53.5 64 -99 SPO 1997 10 26 13 22 100 3.2 -9 673.50 -54.7 -53.9 -53.4 66 -99 SPO 1997 10 26 13 23 99 3.2 -9 673.50 -54.7 -53.9 -53.4 66 -99 SPO 1997 10 26 13 24 100 3.1 -9 673.50 -54.7 -53.7 -53.3 66 -99 SPO 1997 10 26 13 25 102 3.2 -9 673.50 -54.7 -53.7 -53.3 66 -99 SPO 1997 10 26 13 26 102 3.3 -9 673.50 -54.7 -53.7 -53.3 66 -99 SPO 1997 10 26 13 27 103 3.2 -9 673.50 -54.7 -53.7 -53.4 66 -99 SPO 1997 10 26 13 28 105 3.3 -9 673.50 -54.7 -53.7 -53.4 66 -99 SPO 1997 10 26 13 29 104 3.2 -9 673.50 -54.7 -53.9 -53.5 66 -99 SPO 1997 10 26 13 30 106 3.1 -9 673.50 -54.7 -53.9 -53.5 66 -99 SPO 1997 10 26 13 31 106 3.2 -9 673.50 -54.7 -53.9 -53.5 66 -99 SPO 1997 10 26 13 32 106 3.3 -9 673.60 -54.7 -53.9 -53.5 64 -99 SPO 1997 10 26 13 33 105 3.4 -9 673.60 -54.7 -54.0 -53.6 64 -99 SPO 1997 10 26 13 34 105 3.5 -9 673.60 -54.9 -54.0 -53.6 66 -99 SPO 1997 10 26 13 35 105 3.4 -9 673.60 -54.9 -53.9 -53.6 67 -99 SPO 1997 10 26 13 36 106 3.5 -9 673.60 -54.9 -53.9 -53.6 67 -99 SPO 1997 10 26 13 37 104 3.5 -9 673.60 -55.0 -54.0 -53.6 68 -99 SPO 1997 10 26 13 38 102 3.5 -9 673.60 -54.9 -54.0 -53.5 67 -99 SPO 1997 10 26 13 39 100 3.7 -9 673.60 -54.9 -54.0 -53.5 66 -99 SPO 1997 10 26 13 40 100 3.8 -9 673.60 -54.9 -53.9 -53.5 66 -99 SPO 1997 10 26 13 41 99 3.8 -9 673.60 -54.9 -53.9 -53.5 66 -99 SPO 1997 10 26 13 42 100 4.0 -9 673.60 -54.9 -53.9 -53.5 66 -99 SPO 1997 10 26 13 43 101 4.0 -9 673.50 -54.9 -53.9 -53.5 66 -99 SPO 1997 10 26 13 44 103 4.1 -9 673.50 -54.9 -53.9 -53.6 67 -99 SPO 1997 10 26 13 45 101 4.3 -9 673.50 -54.9 -53.9 -53.7 67 -99 SPO 1997 10 26 13 46 102 4.4 -9 673.50 -54.9 -53.9 -53.7 66 -99 SPO 1997 10 26 13 47 103 4.6 -9 673.50 -55.0 -53.9 -53.7 66 -99 SPO 1997 10 26 13 48 102 4.5 -9 673.50 -54.9 -53.9 -53.8 65 -99 SPO 1997 10 26 13 49 102 4.6 -9 673.50 -54.9 -53.9 -53.8 65 -99 SPO 1997 10 26 13 50 103 4.6 -9 673.50 -54.7 -53.9 -53.8 63 -99 SPO 1997 10 26 13 51 102 4.6 -9 673.50 -54.7 -53.9 -53.8 63 -99 SPO 1997 10 26 13 52 101 4.5 -9 673.50 -54.7 -53.9 -53.8 63 -99 SPO 1997 10 26 13 53 102 4.6 -9 673.50 -54.7 -53.9 -53.8 63 -99 SPO 1997 10 26 13 54 103 4.5 -9 673.50 -54.7 -53.9 -53.8 63 -99 SPO 1997 10 26 13 55 103 4.6 -9 673.50 -54.7 -54.0 -53.8 63 -99 SPO 1997 10 26 13 56 102 4.6 -9 673.50 -54.7 -54.0 -53.8 63 -99 SPO 1997 10 26 13 57 100 4.7 -9 673.50 -54.7 -54.0 -53.8 63 -99 SPO 1997 10 26 13 58 99 4.7 -9 673.50 -54.7 -54.0 -53.8 64 -99 SPO 1997 10 26 13 59 100 4.7 -9 673.50 -54.9 -54.0 -53.9 65 -99 SPO 1997 10 26 14 00 102 4.7 -9 673.50 -54.7 -54.0 -53.9 63 0 SPO 1997 10 26 14 01 102 4.6 -9 673.50 -54.9 -54.0 -53.9 65 -99 SPO 1997 10 26 14 02 100 4.6 -9 673.50 -54.9 -54.0 -53.9 65 -99 SPO 1997 10 26 14 03 99 4.8 -9 673.50 -54.9 -53.9 -53.9 63 -99 SPO 1997 10 26 14 04 98 5.0 -9 673.50 -54.9 -53.7 -53.9 63 -99 SPO 1997 10 26 14 05 98 5.2 -9 673.50 -54.7 -53.7 -53.9 62 -99 SPO 1997 10 26 14 06 99 5.2 -9 673.50 -54.7 -53.7 -53.9 63 -99 SPO 1997 10 26 14 07 99 5.1 -9 673.50 -54.7 -53.7 -53.9 63 -99 SPO 1997 10 26 14 08 98 5.1 -9 673.50 -54.7 -53.7 -53.9 63 -99 SPO 1997 10 26 14 09 99 5.2 -9 673.50 -54.7 -53.7 -53.9 63 -99 SPO 1997 10 26 14 10 98 5.2 -9 673.60 -54.7 -53.5 -53.9 63 -99 SPO 1997 10 26 14 11 99 5.2 -9 673.60 -54.7 -53.5 -53.9 63 -99 SPO 1997 10 26 14 12 101 5.2 -9 673.60 -54.5 -53.5 -53.8 62 -99 SPO 1997 10 26 14 13 101 5.2 -9 673.60 -54.5 -53.5 -53.8 62 -99 SPO 1997 10 26 14 14 102 5.2 -9 673.60 -54.5 -53.5 -53.8 63 -99 SPO 1997 10 26 14 15 103 5.4 -9 673.60 -54.5 -53.5 -53.8 63 -99 SPO 1997 10 26 14 16 105 5.4 -9 673.60 -54.4 -53.5 -53.8 61 -99 SPO 1997 10 26 14 17 105 5.4 -9 673.60 -54.4 -53.5 -53.8 61 -99 SPO 1997 10 26 14 18 106 5.4 -9 673.60 -54.4 -53.5 -53.8 61 -99 SPO 1997 10 26 14 19 105 5.3 -9 673.60 -54.4 -53.5 -53.8 63 -99 SPO 1997 10 26 14 20 106 5.3 -9 673.60 -54.4 -53.5 -53.8 63 -99 SPO 1997 10 26 14 21 106 5.3 -9 673.60 -54.4 -53.5 -53.7 63 -99 SPO 1997 10 26 14 22 107 5.3 -9 673.60 -54.4 -53.5 -53.8 65 -99 SPO 1997 10 26 14 23 107 5.3 -9 673.60 -54.4 -53.5 -53.8 65 -99 SPO 1997 10 26 14 24 107 5.4 -9 673.60 -54.4 -53.5 -53.7 65 -99 SPO 1997 10 26 14 25 108 5.4 -9 673.60 -54.4 -53.5 -53.7 65 -99 SPO 1997 10 26 14 26 106 5.3 -9 673.60 -54.4 -53.5 -53.7 65 -99 SPO 1997 10 26 14 27 105 5.2 -9 673.60 -54.2 -53.4 -53.7 62 -99 SPO 1997 10 26 14 28 105 5.2 -9 673.60 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 14 29 104 5.3 -9 673.60 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 14 30 104 5.1 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 31 104 5.1 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 32 102 5.0 -9 673.70 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 33 102 5.1 -9 673.70 -54.2 -53.5 -53.5 63 -99 SPO 1997 10 26 14 34 101 5.1 -9 673.70 -54.2 -53.5 -53.5 63 -99 SPO 1997 10 26 14 35 102 5.0 -9 673.70 -54.2 -53.5 -53.5 63 -99 SPO 1997 10 26 14 36 102 5.2 -9 673.70 -54.2 -53.4 -53.5 63 -99 SPO 1997 10 26 14 37 101 5.2 -9 673.70 -54.2 -53.4 -53.5 63 -99 SPO 1997 10 26 14 38 101 5.2 -9 673.60 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 39 102 5.3 -9 673.60 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 40 100 5.2 -9 673.60 -54.2 -53.5 -53.5 63 -99 SPO 1997 10 26 14 41 99 5.2 -9 673.60 -54.2 -53.5 -53.5 63 -99 SPO 1997 10 26 14 42 99 5.3 -9 673.60 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 43 99 5.3 -9 673.70 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 44 98 5.3 -9 673.70 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 45 99 5.3 -9 673.70 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 14 46 99 5.3 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 47 99 5.3 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 48 99 5.3 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 49 99 5.3 -9 673.70 -54.2 -53.5 -53.6 63 -99 SPO 1997 10 26 14 50 100 5.2 -9 673.70 -54.2 -53.5 -53.6 63 -99 SPO 1997 10 26 14 51 101 5.2 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 52 103 5.1 -9 673.70 -54.2 -53.5 -53.6 62 -99 SPO 1997 10 26 14 53 104 5.1 -9 673.70 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 14 54 104 5.0 -9 673.70 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 14 55 106 4.7 -9 673.70 -54.2 -53.4 -53.5 62 -99 SPO 1997 10 26 14 56 107 4.9 -9 673.70 -54.2 -53.4 -53.6 60 -99 SPO 1997 10 26 14 57 107 4.7 -9 673.70 -54.2 -53.5 -53.6 60 -99 SPO 1997 10 26 14 58 107 4.7 -9 673.70 -54.2 -53.5 -53.6 60 -99 SPO 1997 10 26 14 59 104 4.8 -9 673.70 -54.2 -53.5 -53.5 62 -99 SPO 1997 10 26 15 00 101 4.5 -9 673.80 -54.2 -53.5 -53.5 62 0 SPO 1997 10 26 15 01 99 4.4 -9 673.80 -54.2 -53.5 -53.4 62 -99 SPO 1997 10 26 15 02 98 4.6 -9 673.70 -54.2 -53.5 -53.4 62 -99 SPO 1997 10 26 15 03 99 4.4 -9 673.70 -54.2 -53.5 -53.4 62 -99 SPO 1997 10 26 15 04 101 4.5 -9 673.70 -54.2 -53.5 -53.4 62 -99 SPO 1997 10 26 15 05 103 4.6 -9 673.70 -54.2 -53.7 -53.4 62 -99 SPO 1997 10 26 15 06 103 4.5 -9 673.70 -54.2 -53.7 -53.5 62 -99 SPO 1997 10 26 15 07 103 4.5 -9 673.70 -54.4 -53.7 -53.5 63 -99 SPO 1997 10 26 15 08 100 4.3 -9 673.70 -54.4 -53.7 -53.5 63 -99 SPO 1997 10 26 15 09 99 4.5 -9 673.70 -54.4 -53.7 -53.5 62 -99 SPO 1997 10 26 15 10 96 4.7 -9 673.70 -54.4 -53.7 -53.5 62 -99 SPO 1997 10 26 15 11 94 4.6 -9 673.70 -54.5 -53.7 -53.5 63 -99 SPO 1997 10 26 15 12 93 4.7 -9 673.70 -54.5 -53.7 -53.5 63 -99 SPO 1997 10 26 15 13 92 4.8 -9 673.70 -54.5 -53.7 -53.6 63 -99 SPO 1997 10 26 15 14 91 4.8 -9 673.70 -54.4 -53.7 -53.6 62 -99 SPO 1997 10 26 15 15 92 4.7 -9 673.70 -54.5 -53.7 -53.6 62 -99 SPO 1997 10 26 15 16 93 4.6 -9 673.70 -54.5 -53.7 -53.6 62 -99 SPO 1997 10 26 15 17 93 4.6 -9 673.70 -54.5 -53.7 -53.6 62 -99 SPO 1997 10 26 15 18 94 4.5 -9 673.70 -54.5 -53.7 -53.6 63 -99 SPO 1997 10 26 15 19 96 4.4 -9 673.70 -54.5 -53.7 -53.5 63 -99 SPO 1997 10 26 15 20 98 4.3 -9 673.70 -54.5 -53.7 -53.5 63 -99 SPO 1997 10 26 15 21 101 4.2 -9 673.70 -54.5 -53.7 -53.6 62 -99 SPO 1997 10 26 15 22 103 4.3 -9 673.70 -54.5 -53.9 -53.7 62 -99 SPO 1997 10 26 15 23 102 4.1 -9 673.70 -54.5 -53.9 -53.7 62 -99 SPO 1997 10 26 15 24 101 4.0 -9 673.70 -54.5 -53.9 -53.6 60 -99 SPO 1997 10 26 15 25 99 4.0 -9 673.70 -54.5 -53.9 -53.6 60 -99 SPO 1997 10 26 15 26 99 4.0 -9 673.70 -54.7 -53.9 -53.5 62 -99 SPO 1997 10 26 15 27 98 4.0 -9 673.70 -54.7 -53.9 -53.5 62 -99 SPO 1997 10 26 15 28 97 3.9 -9 673.70 -54.7 -53.7 -53.5 62 -99 SPO 1997 10 26 15 29 96 3.9 -9 673.70 -54.7 -53.7 -53.5 62 -99 SPO 1997 10 26 15 30 94 4.0 -9 673.70 -54.7 -53.7 -53.5 62 -99 SPO 1997 10 26 15 31 92 4.1 -9 673.70 -54.7 -53.5 -53.5 62 -99 SPO 1997 10 26 15 32 91 4.2 -9 673.70 -54.5 -53.5 -53.5 60 -99 SPO 1997 10 26 15 33 92 4.2 -9 673.70 -54.5 -53.5 -53.5 60 -99 SPO 1997 10 26 15 34 92 4.3 -9 673.70 -54.5 -53.7 -53.5 60 -99 SPO 1997 10 26 15 35 94 4.4 -9 673.70 -54.5 -53.7 -53.5 60 -99 SPO 1997 10 26 15 36 93 4.5 -9 673.70 -54.5 -53.5 -53.5 60 -99 SPO 1997 10 26 15 37 91 4.5 -9 673.70 -54.5 -53.5 -53.5 60 -99 SPO 1997 10 26 15 38 90 4.6 -9 673.70 -54.5 -53.5 -53.5 60 -99 SPO 1997 10 26 15 39 87 4.8 -9 673.70 -54.5 -53.5 -53.5 62 -99 SPO 1997 10 26 15 40 86 4.9 -9 673.60 -54.5 -53.5 -53.5 63 -99 SPO 1997 10 26 15 41 86 5.0 -9 673.60 -54.5 -53.5 -53.6 63 -99 SPO 1997 10 26 15 42 87 5.0 -9 673.60 -54.4 -53.5 -53.5 63 -99 SPO 1997 10 26 15 43 88 5.0 -9 673.60 -54.4 -53.5 -53.5 63 -99 SPO 1997 10 26 15 44 88 4.9 -9 673.60 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 15 45 88 5.0 -9 673.60 -54.5 -53.5 -53.6 64 -99 SPO 1997 10 26 15 46 88 4.9 -9 673.60 -54.5 -53.4 -53.6 64 -99 SPO 1997 10 26 15 47 89 4.9 -9 673.60 -54.5 -53.4 -53.6 64 -99 SPO 1997 10 26 15 48 89 4.8 -9 673.60 -54.5 -53.4 -53.6 64 -99 SPO 1997 10 26 15 49 89 4.9 -9 673.60 -54.5 -53.4 -53.6 62 -99 SPO 1997 10 26 15 50 87 4.9 -9 673.60 -54.5 -53.4 -53.5 62 -99 SPO 1997 10 26 15 51 86 4.9 -9 673.60 -54.5 -53.4 -53.6 62 -99 SPO 1997 10 26 15 52 84 4.9 -9 673.60 -54.4 -53.4 -53.6 61 -99 SPO 1997 10 26 15 53 84 4.8 -9 673.60 -54.4 -53.4 -53.6 61 -99 SPO 1997 10 26 15 54 85 4.8 -9 673.60 -54.4 -53.4 -53.6 61 -99 SPO 1997 10 26 15 55 85 4.8 -9 673.60 -54.4 -53.4 -53.6 62 -99 SPO 1997 10 26 15 56 83 4.8 -9 673.60 -54.2 -53.4 -53.6 60 -99 SPO 1997 10 26 15 57 81 4.7 -9 673.70 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 15 58 82 4.5 -9 673.70 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 15 59 84 4.5 -9 673.70 -54.2 -53.4 -53.6 62 -99 SPO 1997 10 26 16 00 85 4.5 -9 673.70 -54.2 -53.4 -53.5 62 0 SPO 1997 10 26 16 01 85 4.3 -9 673.70 -54.2 -53.4 -53.4 62 -99 SPO 1997 10 26 16 02 84 4.3 -9 673.70 -54.2 -53.2 -53.4 62 -99 SPO 1997 10 26 16 03 84 4.2 -9 673.70 -54.2 -53.2 -53.4 62 -99 SPO 1997 10 26 16 04 82 4.2 -9 673.70 -54.2 -53.2 -53.4 62 -99 SPO 1997 10 26 16 05 81 4.1 -9 673.70 -54.2 -53.2 -53.4 62 -99 SPO 1997 10 26 16 06 83 4.2 -9 673.70 -54.2 -53.2 -53.4 62 -99 SPO 1997 10 26 16 07 84 4.1 -9 673.80 -54.2 -53.2 -53.3 62 -99 SPO 1997 10 26 16 08 81 3.9 -9 673.80 -54.2 -53.2 -53.3 63 -99 SPO 1997 10 26 16 09 81 4.0 -9 673.80 -54.2 -53.2 -53.3 62 -99 SPO 1997 10 26 16 10 83 4.1 -9 673.80 -54.2 -53.2 -53.2 63 -99 SPO 1997 10 26 16 11 85 4.2 -9 673.80 -54.2 -53.2 -53.2 63 -99 SPO 1997 10 26 16 12 86 4.3 -9 673.80 -54.2 -53.2 -53.2 63 -99 SPO 1997 10 26 16 13 85 4.3 -9 673.80 -54.2 -53.2 -53.2 63 -99 SPO 1997 10 26 16 14 82 4.4 -9 673.80 -54.2 -53.2 -53.2 62 -99 SPO 1997 10 26 16 15 81 4.5 -9 673.80 -54.2 -53.2 -53.3 62 -99 SPO 1997 10 26 16 16 80 4.4 -9 673.80 -54.2 -53.2 -53.3 62 -99 SPO 1997 10 26 16 17 81 4.5 -9 673.80 -54.2 -53.0 -53.3 62 -99 SPO 1997 10 26 16 18 82 4.5 -9 673.80 -54.2 -53.0 -53.3 62 -99 SPO 1997 10 26 16 19 81 4.6 -9 673.80 -54.2 -53.0 -53.3 62 -99 SPO 1997 10 26 16 20 80 4.7 -9 673.80 -54.2 -53.0 -53.3 62 -99 SPO 1997 10 26 16 21 79 4.7 -9 673.80 -54.2 -53.0 -53.4 62 -99 SPO 1997 10 26 16 22 79 4.8 -9 673.80 -54.2 -53.0 -53.4 62 -99 SPO 1997 10 26 16 23 79 4.9 -9 673.80 -54.2 -53.0 -53.4 62 -99 SPO 1997 10 26 16 24 81 4.9 -9 673.70 -54.0 -52.9 -53.3 60 -99 SPO 1997 10 26 16 25 82 5.0 -9 673.70 -54.0 -52.9 -53.2 62 -99 SPO 1997 10 26 16 26 82 5.0 -9 673.70 -54.0 -52.9 -53.2 63 -99 SPO 1997 10 26 16 27 79 5.1 -9 673.70 -54.0 -52.9 -53.3 63 -99 SPO 1997 10 26 16 28 77 5.1 -9 673.70 -54.0 -52.9 -53.4 63 -99 SPO 1997 10 26 16 29 76 5.0 -9 673.80 -54.0 -53.0 -53.4 63 -99 SPO 1997 10 26 16 30 76 4.8 -9 673.80 -54.0 -53.0 -53.4 63 -99 SPO 1997 10 26 16 31 75 4.9 -9 673.80 -54.0 -53.0 -53.4 62 -99 SPO 1997 10 26 16 32 74 4.8 -9 673.80 -54.0 -53.0 -53.4 62 -99 SPO 1997 10 26 16 33 75 4.7 -9 673.80 -54.0 -53.0 -53.4 62 -99 SPO 1997 10 26 16 34 77 4.7 -9 673.80 -54.0 -52.9 -53.3 62 -99 SPO 1997 10 26 16 35 79 4.4 -9 673.80 -54.0 -52.9 -53.3 63 -99 SPO 1997 10 26 16 36 80 4.2 -9 673.90 -54.0 -52.9 -53.2 63 -99 SPO 1997 10 26 16 37 85 4.1 -9 673.90 -54.0 -52.9 -53.0 64 -99 SPO 1997 10 26 16 38 86 3.9 -9 673.90 -54.0 -53.0 -52.9 64 -99 SPO 1997 10 26 16 39 87 3.7 -9 673.90 -53.9 -53.0 -52.8 63 -99 SPO 1997 10 26 16 40 90 3.8 -9 673.90 -53.9 -53.0 -52.8 63 -99 SPO 1997 10 26 16 41 92 3.7 -9 673.90 -53.9 -53.0 -52.8 63 -99 SPO 1997 10 26 16 42 94 3.7 -9 673.90 -53.9 -53.0 -52.8 62 -99 SPO 1997 10 26 16 43 95 3.7 -9 673.90 -53.9 -53.0 -52.8 62 -99 SPO 1997 10 26 16 44 96 4.1 -9 673.90 -53.9 -53.0 -52.8 62 -99 SPO 1997 10 26 16 45 97 3.9 -9 673.90 -53.9 -53.0 -52.8 62 -99 SPO 1997 10 26 16 46 97 3.9 -9 673.90 -53.9 -53.0 -52.7 63 -99 SPO 1997 10 26 16 47 96 4.0 -9 673.90 -53.9 -53.0 -52.7 63 -99 SPO 1997 10 26 16 48 95 4.1 -9 673.90 -53.9 -53.0 -52.7 63 -99 SPO 1997 10 26 16 49 93 4.0 -9 673.90 -53.9 -53.0 -52.7 65 -99 SPO 1997 10 26 16 50 92 3.9 -9 673.90 -53.9 -53.0 -52.7 65 -99 SPO 1997 10 26 16 51 90 3.8 -9 674.00 -54.0 -53.0 -52.6 66 -99 SPO 1997 10 26 16 52 88 3.7 -9 674.00 -54.0 -53.0 -52.7 66 -99 SPO 1997 10 26 16 53 86 3.6 -9 674.00 -54.0 -53.0 -52.6 66 -99 SPO 1997 10 26 16 54 87 3.6 -9 674.00 -54.0 -53.0 -52.6 66 -99 SPO 1997 10 26 16 55 88 3.6 -9 674.00 -54.0 -53.0 -52.6 66 -99 SPO 1997 10 26 16 56 88 3.7 -9 674.00 -54.0 -53.0 -52.6 64 -99 SPO 1997 10 26 16 57 89 3.8 -9 674.00 -54.0 -53.0 -52.6 64 -99 SPO 1997 10 26 16 58 90 4.0 -9 674.00 -54.0 -53.0 -52.6 64 -99 SPO 1997 10 26 16 59 90 4.0 -9 674.00 -54.0 -53.0 -52.7 64 -99 SPO 1997 10 26 17 00 90 4.1 -9 674.00 -54.0 -53.0 -52.7 64 0 SPO 1997 10 26 17 01 90 4.0 -9 674.00 -54.2 -53.0 -52.7 66 -99 SPO 1997 10 26 17 02 91 4.1 -9 674.00 -54.2 -53.0 -52.8 66 -99 SPO 1997 10 26 17 03 92 4.2 -9 674.00 -54.0 -53.0 -52.7 64 -99 SPO 1997 10 26 17 04 94 4.3 -9 674.00 -54.2 -53.0 -52.8 66 -99 SPO 1997 10 26 17 05 95 4.3 -9 674.00 -54.2 -53.0 -52.8 64 -99 SPO 1997 10 26 17 06 94 4.5 -9 674.00 -54.0 -53.0 -52.8 64 -99 SPO 1997 10 26 17 07 94 4.7 -9 674.00 -54.0 -53.0 -52.9 64 -99 SPO 1997 10 26 17 08 93 4.7 -9 674.00 -54.0 -53.2 -52.9 64 -99 SPO 1997 10 26 17 09 93 4.8 -9 674.00 -54.0 -53.2 -52.9 64 -99 SPO 1997 10 26 17 10 91 4.9 -9 674.00 -54.0 -53.2 -53.0 64 -99 SPO 1997 10 26 17 11 89 4.9 -9 674.00 -54.0 -53.2 -53.0 64 -99 SPO 1997 10 26 17 12 90 4.9 -9 674.00 -54.0 -53.2 -53.0 64 -99 SPO 1997 10 26 17 13 90 4.8 -9 673.90 -54.2 -53.2 -53.0 66 -99 SPO 1997 10 26 17 14 91 4.9 -9 673.90 -54.2 -53.2 -53.1 66 -99 SPO 1997 10 26 17 15 93 4.9 -9 673.90 -54.2 -53.2 -53.1 66 -99 SPO 1997 10 26 17 16 94 4.9 -9 673.90 -54.2 -53.2 -53.1 66 -99 SPO 1997 10 26 17 17 96 4.8 -9 673.90 -54.2 -53.2 -53.2 66 -99 SPO 1997 10 26 17 18 97 4.8 -9 673.90 -54.2 -53.2 -53.2 66 -99 SPO 1997 10 26 17 19 96 4.9 -9 673.90 -54.2 -53.2 -53.2 66 -99 SPO 1997 10 26 17 20 94 4.9 -9 673.90 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 26 17 21 94 4.9 -9 673.90 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 26 17 22 94 4.8 -9 673.90 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 26 17 23 96 4.7 -9 673.90 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 26 17 24 96 4.7 -9 673.90 -54.4 -53.2 -53.3 65 -99 SPO 1997 10 26 17 25 94 4.6 -9 673.90 -54.4 -53.2 -53.3 63 -99 SPO 1997 10 26 17 26 92 4.5 -9 673.90 -54.4 -53.2 -53.3 63 -99 SPO 1997 10 26 17 27 90 4.6 -9 673.90 -54.4 -53.2 -53.3 63 -99 SPO 1997 10 26 17 28 89 4.6 -9 673.90 -54.4 -53.2 -53.3 63 -99 SPO 1997 10 26 17 29 88 4.6 -9 673.90 -54.4 -53.2 -53.3 65 -99 SPO 1997 10 26 17 30 86 4.5 -9 673.90 -54.4 -53.2 -53.3 65 -99 SPO 1997 10 26 17 31 83 4.5 -9 673.90 -54.2 -53.2 -53.4 63 -99 SPO 1997 10 26 17 32 83 4.3 -9 673.90 -54.2 -53.0 -53.4 64 -99 SPO 1997 10 26 17 33 85 4.3 -9 673.90 -54.2 -53.0 -53.3 66 -99 SPO 1997 10 26 17 34 85 4.2 -9 673.90 -54.2 -53.2 -53.2 66 -99 SPO 1997 10 26 17 35 86 4.1 -9 673.90 -54.2 -53.2 -53.2 66 -99 SPO 1997 10 26 17 36 87 4.2 -9 674.00 -54.2 -53.2 -53.1 66 -99 SPO 1997 10 26 17 37 88 4.1 -9 674.00 -54.2 -53.0 -53.1 66 -99 SPO 1997 10 26 17 38 87 4.2 -9 674.00 -54.0 -53.0 -53.0 64 -99 SPO 1997 10 26 17 39 85 4.2 -9 674.00 -54.2 -53.0 -53.0 66 -99 SPO 1997 10 26 17 40 84 4.1 -9 674.00 -54.0 -53.0 -53.0 64 -99 SPO 1997 10 26 17 41 84 4.3 -9 674.00 -54.0 -52.9 -53.0 64 -99 SPO 1997 10 26 17 42 86 4.1 -9 674.00 -54.0 -53.0 -53.0 64 -99 SPO 1997 10 26 17 43 88 3.9 -9 674.00 -54.0 -53.0 -52.9 66 -99 SPO 1997 10 26 17 44 90 3.8 -9 674.00 -54.0 -53.0 -52.8 66 -99 SPO 1997 10 26 17 45 94 3.5 -9 674.00 -54.0 -53.0 -52.8 66 -99 SPO 1997 10 26 17 46 98 3.3 -9 674.10 -54.0 -53.0 -52.8 66 -99 SPO 1997 10 26 17 47 98 3.2 -9 674.10 -54.0 -53.2 -52.9 66 -99 SPO 1997 10 26 17 48 95 3.0 -9 674.10 -54.0 -53.2 -52.9 66 -99 SPO 1997 10 26 17 49 92 2.9 -9 674.10 -54.0 -53.2 -52.7 64 -99 SPO 1997 10 26 17 50 91 2.8 -9 674.10 -54.0 -53.2 -52.5 64 -99 SPO 1997 10 26 17 51 92 2.7 -9 674.10 -54.0 -53.2 -52.5 64 -99 SPO 1997 10 26 17 52 95 2.7 -9 674.10 -54.0 -53.2 -52.5 63 -99 SPO 1997 10 26 17 53 97 2.5 -9 674.10 -54.0 -53.2 -52.5 63 -99 SPO 1997 10 26 17 54 98 2.5 -9 674.20 -54.0 -53.2 -52.6 64 -99 SPO 1997 10 26 17 55 97 2.6 -9 674.20 -54.0 -53.2 -52.4 64 -99 SPO 1997 10 26 17 56 95 2.8 -9 674.20 -54.2 -53.2 -52.4 66 -99 SPO 1997 10 26 17 57 93 3.0 -9 674.20 -54.0 -53.0 -52.3 64 -99 SPO 1997 10 26 17 58 94 3.3 -9 674.20 -54.2 -53.0 -52.3 66 -99 SPO 1997 10 26 17 59 95 3.4 -9 674.10 -54.2 -53.0 -52.4 66 -99 SPO 1997 10 26 18 00 96 3.5 -9 674.10 -54.2 -53.0 -52.4 66 0 SPO 1997 10 26 18 01 95 3.7 -9 674.10 -54.2 -53.0 -52.5 66 -99 SPO 1997 10 26 18 02 94 3.9 -9 674.10 -54.2 -53.0 -52.6 66 -99 SPO 1997 10 26 18 03 93 4.1 -9 674.10 -54.2 -53.0 -52.7 64 -99 SPO 1997 10 26 18 04 91 4.2 -9 674.10 -54.2 -53.0 -52.8 63 -99 SPO 1997 10 26 18 05 91 4.3 -9 674.10 -54.4 -53.0 -52.8 65 -99 SPO 1997 10 26 18 06 90 4.3 -9 674.10 -54.2 -53.0 -52.8 63 -99 SPO 1997 10 26 18 07 92 4.2 -9 674.10 -54.4 -53.0 -52.8 66 -99 SPO 1997 10 26 18 08 95 4.0 -9 674.10 -54.4 -53.0 -52.8 66 -99 SPO 1997 10 26 18 09 97 3.9 -9 674.10 -54.4 -53.0 -52.8 66 -99 SPO 1997 10 26 18 10 100 3.8 -9 674.10 -54.4 -53.0 -52.9 65 -99 SPO 1997 10 26 18 11 100 3.6 -9 674.10 -54.4 -53.0 -53.0 65 -99 SPO 1997 10 26 18 12 100 3.7 -9 674.20 -54.2 -53.0 -53.0 63 -99 SPO 1997 10 26 18 13 100 3.6 -9 674.20 -54.4 -53.0 -53.0 65 -99 SPO 1997 10 26 18 14 99 3.6 -9 674.20 -54.4 -53.0 -53.0 65 -99 SPO 1997 10 26 18 15 99 3.6 -9 674.10 -54.2 -53.0 -53.0 64 -99 SPO 1997 10 26 18 16 98 3.6 -9 674.10 -54.4 -53.0 -52.9 66 -99 SPO 1997 10 26 18 17 96 3.5 -9 674.10 -54.4 -53.0 -52.8 65 -99 SPO 1997 10 26 18 18 93 3.5 -9 674.10 -54.2 -53.0 -52.7 63 -99 SPO 1997 10 26 18 19 89 3.6 -9 674.10 -54.4 -53.0 -52.7 63 -99 SPO 1997 10 26 18 20 87 3.7 -9 674.10 -54.4 -53.0 -52.7 65 -99 SPO 1997 10 26 18 21 87 3.8 -9 674.10 -54.4 -53.2 -52.7 65 -99 SPO 1997 10 26 18 22 85 3.9 -9 674.10 -54.4 -53.0 -52.8 66 -99 SPO 1997 10 26 18 23 85 3.9 -9 674.10 -54.4 -53.0 -52.8 66 -99 SPO 1997 10 26 18 24 84 3.9 -9 674.10 -54.5 -53.0 -52.8 66 -99 SPO 1997 10 26 18 25 83 3.9 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 26 84 3.9 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 27 86 3.9 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 28 85 3.9 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 29 85 3.9 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 30 85 3.8 -9 674.10 -54.5 -53.0 -52.9 66 -99 SPO 1997 10 26 18 31 85 3.5 -9 674.10 -54.5 -53.0 -52.8 64 -99 SPO 1997 10 26 18 32 85 3.3 -9 674.10 -54.5 -53.0 -52.8 64 -99 SPO 1997 10 26 18 33 85 3.0 -9 674.10 -54.5 -53.0 -52.6 63 -99 SPO 1997 10 26 18 34 85 2.9 -9 674.10 -54.5 -53.0 -52.6 64 -99 SPO 1997 10 26 18 35 83 2.8 -9 674.10 -54.5 -53.0 -52.5 64 -99 SPO 1997 10 26 18 36 83 2.7 -9 674.10 -54.4 -53.0 -52.4 65 -99 SPO 1997 10 26 18 37 80 2.4 -9 674.10 -54.4 -53.0 -52.3 65 -99 SPO 1997 10 26 18 38 80 2.4 -9 674.20 -54.4 -53.0 -52.3 66 -99 SPO 1997 10 26 18 39 81 2.5 -9 674.20 -54.4 -53.0 -52.3 66 -99 SPO 1997 10 26 18 40 81 2.5 -9 674.20 -54.4 -53.0 -52.2 67 -99 SPO 1997 10 26 18 41 84 2.5 -9 674.20 -54.4 -53.0 -52.1 67 -99 SPO 1997 10 26 18 42 92 2.4 -9 674.20 -54.2 -53.2 -52.0 66 -99 SPO 1997 10 26 18 43 96 2.4 -9 674.20 -54.4 -53.2 -52.3 67 -99 SPO 1997 10 26 18 44 99 2.4 -9 674.20 -54.2 -53.2 -52.6 66 -99 SPO 1997 10 26 18 45 103 2.5 -9 674.20 -54.4 -53.2 -52.8 67 -99 SPO 1997 10 26 18 46 103 2.6 -9 674.20 -54.4 -53.2 -53.0 65 -99 SPO 1997 10 26 18 47 101 2.6 -9 674.20 -54.4 -53.2 -53.0 65 -99 SPO 1997 10 26 18 48 101 2.7 -9 674.20 -54.4 -53.2 -52.9 65 -99 SPO 1997 10 26 18 49 101 3.0 -9 674.20 -54.5 -53.2 -52.9 66 -99 SPO 1997 10 26 18 50 101 3.0 -9 674.20 -54.4 -53.2 -52.9 65 -99 SPO 1997 10 26 18 51 101 3.1 -9 674.20 -54.5 -53.2 -52.9 66 -99 SPO 1997 10 26 18 52 101 3.2 -9 674.20 -54.5 -53.0 -53.0 66 -99 SPO 1997 10 26 18 53 104 3.0 -9 674.20 -54.5 -53.0 -53.1 66 -99 SPO 1997 10 26 18 54 105 2.8 -9 674.20 -54.7 -53.0 -53.3 67 -99 SPO 1997 10 26 18 55 104 2.9 -9 674.20 -54.7 -53.0 -53.3 66 -99 SPO 1997 10 26 18 56 101 3.0 -9 674.20 -54.7 -53.0 -53.3 66 -99 SPO 1997 10 26 18 57 97 3.2 -9 674.20 -54.7 -53.0 -53.1 66 -99 SPO 1997 10 26 18 58 95 3.5 -9 674.20 -54.7 -53.0 -52.8 66 -99 SPO 1997 10 26 18 59 94 3.8 -9 674.10 -54.9 -52.9 -52.8 66 -99 SPO 1997 10 26 19 00 93 3.9 -9 674.10 -54.7 -52.9 -52.8 63 0 SPO 1997 10 26 19 01 89 4.0 -9 674.10 -54.9 -52.9 -52.9 65 -99 SPO 1997 10 26 19 02 88 4.2 -9 674.10 -54.9 -52.7 -52.9 65 -99 SPO 1997 10 26 19 03 89 4.2 -9 674.10 -54.9 -52.7 -52.9 65 -99 SPO 1997 10 26 19 04 91 4.1 -9 674.10 -54.7 -52.7 -52.9 63 -99 SPO 1997 10 26 19 05 93 4.0 -9 674.10 -54.7 -52.7 -52.9 63 -99 SPO 1997 10 26 19 06 95 3.9 -9 674.10 -54.7 -52.7 -52.9 64 -99 SPO 1997 10 26 19 07 94 3.8 -9 674.10 -54.7 -52.7 -52.8 66 -99 SPO 1997 10 26 19 08 93 3.7 -9 674.20 -54.7 -52.7 -52.8 66 -99 SPO 1997 10 26 19 09 93 3.5 -9 674.20 -54.7 -52.7 -52.7 66 -99 SPO 1997 10 26 19 10 94 3.2 -9 674.20 -54.7 -52.7 -52.6 66 -99 SPO 1997 10 26 19 11 99 3.0 -9 674.20 -54.7 -52.7 -52.7 66 -99 SPO 1997 10 26 19 12 106 2.8 -9 674.20 -54.7 -52.7 -53.0 66 -99 SPO 1997 10 26 19 13 107 2.6 -9 674.30 -54.7 -52.9 -53.3 66 -99 SPO 1997 10 26 19 14 106 2.8 -9 674.30 -54.7 -52.7 -53.3 66 -99 SPO 1997 10 26 19 15 105 2.7 -9 674.30 -54.7 -52.7 -53.2 64 -99 SPO 1997 10 26 19 16 104 2.8 -9 674.30 -54.5 -52.7 -53.2 63 -99 SPO 1997 10 26 19 17 107 2.7 -9 674.30 -54.5 -52.9 -53.2 64 -99 SPO 1997 10 26 19 18 111 2.9 -9 674.30 -54.5 -52.9 -53.3 64 -99 SPO 1997 10 26 19 19 114 2.9 -9 674.30 -54.5 -53.0 -53.4 64 -99 SPO 1997 10 26 19 20 116 2.9 -9 674.30 -54.5 -53.0 -53.4 64 -99 SPO 1997 10 26 19 21 115 3.0 -9 674.30 -54.5 -53.0 -53.5 64 -99 SPO 1997 10 26 19 22 111 3.3 -9 674.30 -54.7 -53.0 -53.5 66 -99 SPO 1997 10 26 19 23 110 3.4 -9 674.30 -54.7 -53.0 -53.5 66 -99 SPO 1997 10 26 19 24 111 3.4 -9 674.30 -54.7 -53.0 -53.6 66 -99 SPO 1997 10 26 19 25 113 3.4 -9 674.30 -54.9 -53.0 -53.6 67 -99 SPO 1997 10 26 19 26 116 3.4 -9 674.30 -54.9 -53.0 -53.7 66 -99 SPO 1997 10 26 19 27 117 3.5 -9 674.30 -54.9 -53.0 -53.7 65 -99 SPO 1997 10 26 19 28 117 3.5 -9 674.30 -54.7 -53.0 -53.7 63 -99 SPO 1997 10 26 19 29 116 3.7 -9 674.30 -54.7 -53.0 -53.7 63 -99 SPO 1997 10 26 19 30 115 4.0 -9 674.30 -54.7 -53.0 -53.7 63 -99 SPO 1997 10 26 19 31 113 4.2 -9 674.30 -54.7 -53.0 -53.7 63 -99 SPO 1997 10 26 19 32 113 4.3 -9 674.30 -54.7 -53.0 -53.6 63 -99 SPO 1997 10 26 19 33 112 4.5 -9 674.20 -54.7 -53.0 -53.6 63 -99 SPO 1997 10 26 19 34 110 4.6 -9 674.20 -54.7 -52.9 -53.4 64 -99 SPO 1997 10 26 19 35 107 4.8 -9 674.20 -54.7 -52.7 -53.3 64 -99 SPO 1997 10 26 19 36 106 4.9 -9 674.20 -54.5 -52.7 -53.3 64 -99 SPO 1997 10 26 19 37 106 5.0 -9 674.20 -54.5 -52.7 -53.3 64 -99 SPO 1997 10 26 19 38 108 5.1 -9 674.20 -54.5 -52.7 -53.3 64 -99 SPO 1997 10 26 19 39 107 5.1 -9 674.20 -54.5 -52.7 -53.3 64 -99 SPO 1997 10 26 19 40 107 5.1 -9 674.20 -54.5 -52.7 -53.4 64 -99 SPO 1997 10 26 19 41 107 5.1 -9 674.20 -54.5 -52.7 -53.4 64 -99 SPO 1997 10 26 19 42 106 5.0 -9 674.20 -54.5 -52.7 -53.4 64 -99 SPO 1997 10 26 19 43 107 5.0 -9 674.20 -54.5 -52.7 -53.4 64 -99 SPO 1997 10 26 19 44 109 5.0 -9 674.20 -54.5 -52.7 -53.6 64 -99 SPO 1997 10 26 19 45 110 5.1 -9 674.20 -54.7 -53.0 -53.7 66 -99 SPO 1997 10 26 19 46 111 5.1 -9 674.20 -54.7 -53.0 -53.8 64 -99 SPO 1997 10 26 19 47 110 4.9 -9 674.20 -54.7 -53.0 -53.8 64 -99 SPO 1997 10 26 19 48 109 4.8 -9 674.20 -54.7 -53.0 -53.8 64 -99 SPO 1997 10 26 19 49 107 4.6 -9 674.20 -54.7 -53.0 -53.8 64 -99 SPO 1997 10 26 19 50 110 4.7 -9 674.30 -54.9 -53.0 -53.8 66 -99 SPO 1997 10 26 19 51 114 4.7 -9 674.30 -54.9 -53.2 -54.0 66 -99 SPO 1997 10 26 19 52 113 4.6 -9 674.30 -54.9 -53.2 -54.1 66 -99 SPO 1997 10 26 19 53 114 4.9 -9 674.30 -54.9 -53.2 -54.2 65 -99 SPO 1997 10 26 19 54 114 4.8 -9 674.30 -55.0 -53.0 -54.2 66 -99 SPO 1997 10 26 19 55 115 4.8 -9 674.30 -55.0 -53.0 -54.2 66 -99 SPO 1997 10 26 19 56 116 4.5 -9 674.30 -54.9 -53.2 -54.3 63 -99 SPO 1997 10 26 19 57 115 4.4 -9 674.30 -54.9 -53.4 -54.3 63 -99 SPO 1997 10 26 19 58 118 4.7 -9 674.40 -55.0 -53.5 -54.3 66 -99 SPO 1997 10 26 19 59 118 5.0 -9 674.40 -55.0 -53.4 -54.4 66 -99 SPO 1997 10 26 20 00 120 5.1 -9 674.40 -54.9 -53.2 -54.4 65 0 SPO 1997 10 26 20 01 121 5.1 -9 674.40 -54.9 -53.0 -54.4 65 -99 SPO 1997 10 26 20 02 122 5.2 -9 674.40 -54.9 -53.0 -54.4 65 -99 SPO 1997 10 26 20 03 123 5.1 -9 674.40 -54.7 -52.9 -54.4 64 -99 SPO 1997 10 26 20 04 124 4.7 -9 674.40 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 05 126 5.6 -9 674.40 -54.9 -53.0 -54.4 67 -99 SPO 1997 10 26 20 06 123 5.2 -9 674.40 -54.9 -53.0 -54.4 67 -99 SPO 1997 10 26 20 07 125 5.2 -9 674.40 -54.9 -53.2 -54.4 67 -99 SPO 1997 10 26 20 08 126 5.2 -9 674.40 -54.9 -53.2 -54.5 66 -99 SPO 1997 10 26 20 09 126 5.2 -9 674.40 -54.9 -53.2 -54.5 66 -99 SPO 1997 10 26 20 10 125 5.0 -9 674.40 -54.9 -53.2 -54.5 66 -99 SPO 1997 10 26 20 11 124 5.1 -9 674.40 -54.9 -53.4 -54.5 66 -99 SPO 1997 10 26 20 12 123 5.5 -9 674.40 -54.7 -53.2 -54.4 64 -99 SPO 1997 10 26 20 13 123 5.2 -9 674.40 -54.7 -53.0 -54.4 66 -99 SPO 1997 10 26 20 14 126 5.2 -9 674.40 -54.7 -53.0 -54.4 66 -99 SPO 1997 10 26 20 15 127 5.1 -9 674.50 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 16 127 4.8 -9 674.50 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 17 125 4.8 -9 674.50 -54.7 -53.4 -54.4 66 -99 SPO 1997 10 26 20 18 124 5.1 -9 674.50 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 19 123 5.1 -9 674.50 -54.7 -53.0 -54.3 64 -99 SPO 1997 10 26 20 20 124 5.3 -9 674.50 -54.7 -53.0 -54.3 64 -99 SPO 1997 10 26 20 21 126 5.3 -9 674.50 -54.7 -52.7 -54.4 64 -99 SPO 1997 10 26 20 22 126 5.1 -9 674.50 -54.7 -52.7 -54.4 64 -99 SPO 1997 10 26 20 23 126 5.1 -9 674.50 -54.9 -52.9 -54.4 66 -99 SPO 1997 10 26 20 24 125 5.0 -9 674.50 -54.9 -52.9 -54.4 67 -99 SPO 1997 10 26 20 25 125 5.0 -9 674.60 -54.7 -53.0 -54.4 66 -99 SPO 1997 10 26 20 26 124 4.9 -9 674.60 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 27 122 4.9 -9 674.60 -54.7 -53.2 -54.4 66 -99 SPO 1997 10 26 20 28 122 5.2 -9 674.60 -54.9 -53.0 -54.4 67 -99 SPO 1997 10 26 20 29 123 5.2 -9 674.60 -54.7 -52.7 -54.4 66 -99 SPO 1997 10 26 20 30 124 5.1 -9 674.60 -54.7 -52.9 -54.4 66 -99 SPO 1997 10 26 20 31 125 5.1 -9 674.60 -54.9 -53.0 -54.5 67 -99 SPO 1997 10 26 20 32 125 5.2 -9 674.60 -54.7 -52.9 -54.5 64 -99 SPO 1997 10 26 20 33 124 5.2 -9 674.60 -54.7 -53.0 -54.4 64 -99 SPO 1997 10 26 20 34 122 4.9 -9 674.60 -54.7 -52.9 -54.4 63 -99 SPO 1997 10 26 20 35 122 4.9 -9 674.60 -54.7 -52.7 -54.4 64 -99 SPO 1997 10 26 20 36 123 4.7 -9 674.70 -54.7 -53.0 -54.3 64 -99 SPO 1997 10 26 20 37 123 4.6 -9 674.60 -54.7 -53.2 -54.3 66 -99 SPO 1997 10 26 20 38 123 4.6 -9 674.50 -54.7 -53.2 -54.3 66 -99 SPO 1997 10 26 20 39 122 4.9 -9 674.50 -54.7 -52.9 -54.3 67 -99 SPO 1997 10 26 20 40 122 4.9 -9 674.50 -54.7 -52.7 -54.4 67 -99 SPO 1997 10 26 20 41 121 5.0 -9 674.50 -54.7 -52.9 -54.4 66 -99 SPO 1997 10 26 20 42 120 5.1 -9 674.50 -54.7 -53.0 -54.4 66 -99 SPO 1997 10 26 20 43 119 5.1 -9 674.50 -54.7 -53.0 -54.3 66 -99 SPO 1997 10 26 20 44 119 5.4 -9 674.40 -54.7 -53.0 -54.3 66 -99 SPO 1997 10 26 20 45 119 5.4 -9 674.40 -54.7 -53.0 -54.3 66 -99 SPO 1997 10 26 20 46 118 5.4 -9 674.40 -54.7 -53.0 -54.2 66 -99 SPO 1997 10 26 20 47 116 5.4 -9 674.40 -54.7 -52.9 -54.2 66 -99 SPO 1997 10 26 20 48 113 5.4 -9 674.40 -54.7 -52.7 -54.2 66 -99 SPO 1997 10 26 20 49 112 5.3 -9 674.50 -54.7 -52.7 -54.1 66 -99 SPO 1997 10 26 20 50 114 5.0 -9 674.40 -54.7 -52.7 -54.1 67 -99 SPO 1997 10 26 20 51 113 5.1 -9 674.40 -54.7 -53.0 -54.1 67 -99 SPO 1997 10 26 20 52 110 5.1 -9 674.40 -54.5 -53.0 -54.1 64 -99 SPO 1997 10 26 20 53 108 5.1 -9 674.40 -54.5 -53.2 -53.9 64 -99 SPO 1997 10 26 20 54 105 4.9 -9 674.40 -54.5 -53.2 -53.9 66 -99 SPO 1997 10 26 20 55 103 5.0 -9 674.40 -54.5 -53.0 -53.8 66 -99 SPO 1997 10 26 20 56 105 5.0 -9 674.40 -54.5 -53.2 -53.8 66 -99 SPO 1997 10 26 20 57 108 5.0 -9 674.30 -54.5 -53.2 -53.9 66 -99 SPO 1997 10 26 20 58 109 5.1 -9 674.30 -54.5 -53.4 -53.9 64 -99 SPO 1997 10 26 20 59 107 5.2 -9 674.30 -54.5 -53.5 -53.9 64 -99 SPO 1997 10 26 21 00 104 5.1 -9 674.30 -54.5 -53.4 -53.9 66 0 SPO 1997 10 26 21 01 104 5.2 -9 674.30 -54.7 -53.2 -53.9 67 -99 SPO 1997 10 26 21 02 105 5.3 -9 674.30 -54.7 -53.2 -53.9 67 -99 SPO 1997 10 26 21 03 106 5.3 -9 674.30 -54.7 -53.4 -54.0 67 -99 SPO 1997 10 26 21 04 103 5.0 -9 674.30 -54.7 -53.4 -53.9 67 -99 SPO 1997 10 26 21 05 101 4.8 -9 674.30 -54.7 -53.5 -53.9 67 -99 SPO 1997 10 26 21 06 99 4.7 -9 674.30 -54.7 -53.5 -53.9 67 -99 SPO 1997 10 26 21 07 98 4.6 -9 674.30 -54.7 -53.5 -53.9 66 -99 SPO 1997 10 26 21 08 98 4.7 -9 674.40 -54.7 -53.5 -53.9 66 -99 SPO 1997 10 26 21 09 98 4.7 -9 674.40 -54.7 -53.5 -53.9 66 -99 SPO 1997 10 26 21 10 96 4.7 -9 674.40 -54.7 -53.7 -53.9 64 -99 SPO 1997 10 26 21 11 95 4.8 -9 674.40 -54.7 -53.7 -53.9 64 -99 SPO 1997 10 26 21 12 94 4.7 -9 674.40 -54.7 -53.7 -53.9 64 -99 SPO 1997 10 26 21 13 93 4.5 -9 674.40 -54.7 -53.7 -53.9 66 -99 SPO 1997 10 26 21 14 92 4.4 -9 674.40 -54.7 -53.7 -53.9 66 -99 SPO 1997 10 26 21 15 94 4.4 -9 674.50 -54.7 -53.7 -53.9 66 -99 SPO 1997 10 26 21 16 95 4.4 -9 674.50 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 21 17 95 4.4 -9 674.50 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 21 18 96 4.4 -9 674.50 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 21 19 95 4.6 -9 674.50 -54.7 -53.7 -53.8 66 -99 SPO 1997 10 26 21 20 92 4.7 -9 674.50 -54.7 -53.5 -53.8 66 -99 SPO 1997 10 26 21 21 91 4.6 -9 674.60 -54.5 -53.5 -53.8 64 -99 SPO 1997 10 26 21 22 93 4.6 -9 674.60 -54.5 -53.5 -53.7 64 -99 SPO 1997 10 26 21 23 94 4.6 -9 674.60 -54.5 -53.4 -53.7 64 -99 SPO 1997 10 26 21 24 95 4.7 -9 674.60 -54.5 -53.4 -53.7 64 -99 SPO 1997 10 26 21 25 94 4.6 -9 674.50 -54.5 -53.2 -53.7 66 -99 SPO 1997 10 26 21 26 95 4.7 -9 674.50 -54.5 -53.2 -53.7 66 -99 SPO 1997 10 26 21 27 96 4.7 -9 674.50 -54.5 -53.2 -53.7 66 -99 SPO 1997 10 26 21 28 98 4.7 -9 674.50 -54.4 -53.2 -53.7 66 -99 SPO 1997 10 26 21 29 97 4.7 -9 674.50 -54.4 -53.2 -53.7 67 -99 SPO 1997 10 26 21 30 97 4.6 -9 674.50 -54.4 -53.2 -53.7 67 -99 SPO 1997 10 26 21 31 97 4.5 -9 674.50 -54.4 -53.0 -53.7 67 -99 SPO 1997 10 26 21 32 99 4.6 -9 674.50 -54.4 -53.0 -53.7 67 -99 SPO 1997 10 26 21 33 100 4.6 -9 674.50 -54.4 -53.0 -53.7 67 -99 SPO 1997 10 26 21 34 100 4.8 -9 674.50 -54.4 -53.0 -53.7 67 -99 SPO 1997 10 26 21 35 100 4.9 -9 674.50 -54.4 -53.0 -53.7 66 -99 SPO 1997 10 26 21 36 100 5.1 -9 674.50 -54.4 -52.9 -53.7 66 -99 SPO 1997 10 26 21 37 99 5.3 -9 674.50 -54.4 -52.9 -53.7 66 -99 SPO 1997 10 26 21 38 99 5.3 -9 674.40 -54.2 -52.9 -53.7 64 -99 SPO 1997 10 26 21 39 98 5.3 -9 674.40 -54.2 -52.9 -53.7 66 -99 SPO 1997 10 26 21 40 96 5.5 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 41 96 5.6 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 42 95 5.6 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 43 93 5.7 -9 674.40 -54.2 -52.7 -53.7 67 -99 SPO 1997 10 26 21 44 92 5.7 -9 674.40 -54.2 -52.7 -53.7 67 -99 SPO 1997 10 26 21 45 92 5.8 -9 674.40 -54.2 -52.7 -53.7 67 -99 SPO 1997 10 26 21 46 93 5.8 -9 674.40 -54.2 -52.7 -53.7 67 -99 SPO 1997 10 26 21 47 91 5.7 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 48 90 5.7 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 49 89 5.5 -9 674.40 -54.2 -52.7 -53.7 66 -99 SPO 1997 10 26 21 50 88 5.5 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 51 89 5.5 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 52 89 5.5 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 53 89 5.3 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 54 88 5.4 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 55 87 5.5 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 56 88 5.4 -9 674.40 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 26 21 57 88 5.3 -9 674.40 -54.2 -52.5 -53.8 67 -99 SPO 1997 10 26 21 58 86 5.2 -9 674.40 -54.2 -52.5 -53.7 66 -99 SPO 1997 10 26 21 59 87 5.2 -9 674.40 -54.2 -52.5 -53.7 66 -99 SPO 1997 10 26 22 00 86 4.9 -9 674.40 -54.2 -52.7 -53.6 66 0 SPO 1997 10 26 22 01 85 5.3 -9 674.40 -54.0 -52.7 -53.6 64 -99 SPO 1997 10 26 22 02 84 5.2 -9 674.40 -54.0 -52.7 -53.6 64 -99 SPO 1997 10 26 22 03 84 5.4 -9 674.40 -54.0 -52.7 -53.5 66 -99 SPO 1997 10 26 22 04 84 5.4 -9 674.40 -54.0 -52.7 -53.5 66 -99 SPO 1997 10 26 22 05 84 5.4 -9 674.40 -54.0 -52.5 -53.5 67 -99 SPO 1997 10 26 22 06 85 5.4 -9 674.40 -54.0 -52.5 -53.4 67 -99 SPO 1997 10 26 22 07 84 5.4 -9 674.40 -54.0 -52.7 -53.4 68 -99 SPO 1997 10 26 22 08 84 5.3 -9 674.40 -54.0 -52.7 -53.4 68 -99 SPO 1997 10 26 22 09 83 5.5 -9 674.30 -54.0 -52.7 -53.4 68 -99 SPO 1997 10 26 22 10 82 5.4 -9 674.40 -54.0 -52.5 -53.4 68 -99 SPO 1997 10 26 22 11 83 5.5 -9 674.30 -54.0 -52.5 -53.3 67 -99 SPO 1997 10 26 22 12 83 5.5 -9 674.30 -54.0 -52.5 -53.3 67 -99 SPO 1997 10 26 22 13 82 5.4 -9 674.30 -54.0 -52.5 -53.3 67 -99 SPO 1997 10 26 22 14 82 5.3 -9 674.40 -54.0 -52.5 -53.3 66 -99 SPO 1997 10 26 22 15 81 5.2 -9 674.40 -53.9 -52.5 -53.3 66 -99 SPO 1997 10 26 22 16 80 5.1 -9 674.40 -53.9 -52.7 -53.3 65 -99 SPO 1997 10 26 22 17 80 5.0 -9 674.40 -53.9 -52.7 -53.3 66 -99 SPO 1997 10 26 22 18 80 4.9 -9 674.40 -53.9 -52.7 -53.3 66 -99 SPO 1997 10 26 22 19 78 4.6 -9 674.40 -53.9 -52.7 -53.3 66 -99 SPO 1997 10 26 22 20 77 4.5 -9 674.40 -53.9 -52.9 -53.3 66 -99 SPO 1997 10 26 22 21 77 4.4 -9 674.40 -54.0 -52.9 -53.3 67 -99 SPO 1997 10 26 22 22 78 4.3 -9 674.50 -54.0 -52.9 -53.3 68 -99 SPO 1997 10 26 22 23 80 4.2 -9 674.50 -53.9 -52.9 -53.2 66 -99 SPO 1997 10 26 22 24 81 4.0 -9 674.50 -53.9 -52.9 -53.1 65 -99 SPO 1997 10 26 22 25 80 3.8 -9 674.50 -53.9 -53.0 -53.0 65 -99 SPO 1997 10 26 22 26 77 3.7 -9 674.50 -54.0 -53.0 -53.0 66 -99 SPO 1997 10 26 22 27 77 3.3 -9 674.50 -53.9 -53.0 -52.9 65 -99 SPO 1997 10 26 22 28 80 3.0 -9 674.50 -53.9 -53.2 -52.8 65 -99 SPO 1997 10 26 22 29 82 2.9 -9 674.50 -53.9 -53.2 -52.7 65 -99 SPO 1997 10 26 22 30 85 2.9 -9 674.50 -54.0 -53.2 -52.5 67 -99 SPO 1997 10 26 22 31 85 2.8 -9 674.50 -54.0 -53.2 -52.4 67 -99 SPO 1997 10 26 22 32 86 2.7 -9 674.50 -54.0 -53.2 -52.4 67 -99 SPO 1997 10 26 22 33 91 2.6 -9 674.60 -54.0 -53.2 -52.4 67 -99 SPO 1997 10 26 22 34 90 2.6 -9 674.60 -54.0 -53.4 -52.4 67 -99 SPO 1997 10 26 22 35 89 2.7 -9 674.60 -54.0 -53.4 -52.4 67 -99 SPO 1997 10 26 22 36 89 3.0 -9 674.60 -54.0 -53.4 -52.5 68 -99 SPO 1997 10 26 22 37 89 3.2 -9 674.60 -54.0 -53.4 -52.6 67 -99 SPO 1997 10 26 22 38 91 3.3 -9 674.50 -54.2 -53.4 -52.8 68 -99 SPO 1997 10 26 22 39 93 3.2 -9 674.50 -54.2 -53.4 -52.9 67 -99 SPO 1997 10 26 22 40 92 3.2 -9 674.50 -54.2 -53.2 -53.0 67 -99 SPO 1997 10 26 22 41 92 3.3 -9 674.50 -54.2 -53.2 -53.0 67 -99 SPO 1997 10 26 22 42 92 3.3 -9 674.50 -54.2 -53.2 -53.1 67 -99 SPO 1997 10 26 22 43 93 3.3 -9 674.50 -54.2 -53.2 -53.1 67 -99 SPO 1997 10 26 22 44 94 3.3 -9 674.50 -54.2 -53.2 -53.1 67 -99 SPO 1997 10 26 22 45 95 3.4 -9 674.50 -54.4 -53.2 -53.1 69 -99 SPO 1997 10 26 22 46 96 3.4 -9 674.50 -54.4 -53.2 -53.2 69 -99 SPO 1997 10 26 22 47 97 3.4 -9 674.50 -54.4 -53.2 -53.2 69 -99 SPO 1997 10 26 22 48 97 3.3 -9 674.50 -54.5 -53.2 -53.2 70 -99 SPO 1997 10 26 22 49 99 3.3 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 22 50 99 3.3 -9 674.50 -54.4 -53.2 -53.2 67 -99 SPO 1997 10 26 22 51 98 3.6 -9 674.50 -54.4 -53.2 -53.1 67 -99 SPO 1997 10 26 22 52 96 3.8 -9 674.50 -54.4 -53.2 -53.0 67 -99 SPO 1997 10 26 22 53 95 3.8 -9 674.50 -54.4 -53.2 -53.0 66 -99 SPO 1997 10 26 22 54 94 3.8 -9 674.50 -54.4 -53.2 -53.0 66 -99 SPO 1997 10 26 22 55 94 3.9 -9 674.50 -54.4 -53.2 -53.0 67 -99 SPO 1997 10 26 22 56 94 4.0 -9 674.50 -54.5 -53.2 -53.1 68 -99 SPO 1997 10 26 22 57 92 4.1 -9 674.50 -54.5 -53.2 -53.1 68 -99 SPO 1997 10 26 22 58 92 4.1 -9 674.50 -54.5 -53.2 -53.1 68 -99 SPO 1997 10 26 22 59 91 4.1 -9 674.50 -54.5 -53.2 -53.1 68 -99 SPO 1997 10 26 23 00 92 4.2 -9 674.50 -54.5 -53.2 -53.1 68 0 SPO 1997 10 26 23 01 93 4.2 -9 674.40 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 02 92 4.3 -9 674.40 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 03 92 4.3 -9 674.40 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 04 91 4.3 -9 674.40 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 05 90 4.2 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 06 90 4.2 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 07 91 4.2 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 08 91 4.1 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 09 90 4.1 -9 674.50 -54.5 -53.2 -53.2 66 -99 SPO 1997 10 26 23 10 90 4.1 -9 674.50 -54.5 -53.2 -53.2 66 -99 SPO 1997 10 26 23 11 90 4.1 -9 674.50 -54.5 -53.2 -53.2 66 -99 SPO 1997 10 26 23 12 90 4.0 -9 674.50 -54.5 -53.2 -53.2 66 -99 SPO 1997 10 26 23 13 90 4.0 -9 674.50 -54.5 -53.2 -53.1 66 -99 SPO 1997 10 26 23 14 90 4.0 -9 674.50 -54.5 -53.4 -53.1 66 -99 SPO 1997 10 26 23 15 89 4.2 -9 674.50 -54.5 -53.4 -53.1 66 -99 SPO 1997 10 26 23 16 88 4.4 -9 674.50 -54.5 -53.4 -53.1 66 -99 SPO 1997 10 26 23 17 87 4.5 -9 674.60 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 18 87 4.6 -9 674.50 -54.5 -53.2 -53.2 68 -99 SPO 1997 10 26 23 19 86 4.7 -9 674.50 -54.5 -53.2 -53.3 68 -99 SPO 1997 10 26 23 20 86 4.8 -9 674.50 -54.5 -53.2 -53.3 68 -99 SPO 1997 10 26 23 21 86 4.8 -9 674.50 -54.5 -53.2 -53.4 68 -99 SPO 1997 10 26 23 22 85 5.0 -9 674.50 -54.5 -53.0 -53.4 68 -99 SPO 1997 10 26 23 23 85 5.0 -9 674.50 -54.5 -53.0 -53.5 66 -99 SPO 1997 10 26 23 24 85 5.0 -9 674.50 -54.5 -53.0 -53.6 66 -99 SPO 1997 10 26 23 25 86 5.1 -9 674.50 -54.4 -53.0 -53.7 66 -99 SPO 1997 10 26 23 26 87 5.1 -9 674.50 -54.4 -52.9 -53.7 66 -99 SPO 1997 10 26 23 27 88 5.1 -9 674.50 -54.4 -52.9 -53.7 66 -99 SPO 1997 10 26 23 28 87 5.1 -9 674.50 -54.4 -52.9 -53.8 66 -99 SPO 1997 10 26 23 29 86 5.0 -9 674.50 -54.4 -52.9 -53.7 65 -99 SPO 1997 10 26 23 30 85 5.0 -9 674.50 -54.4 -52.9 -53.7 65 -99 SPO 1997 10 26 23 31 85 4.7 -9 674.50 -54.4 -53.0 -53.7 66 -99 SPO 1997 10 26 23 32 84 4.5 -9 674.50 -54.4 -53.0 -53.6 66 -99 SPO 1997 10 26 23 33 84 4.5 -9 674.60 -54.4 -52.9 -53.5 66 -99 SPO 1997 10 26 23 34 84 4.5 -9 674.60 -54.4 -52.9 -53.5 66 -99 SPO 1997 10 26 23 35 84 4.3 -9 674.60 -54.4 -52.9 -53.5 65 -99 SPO 1997 10 26 23 36 85 4.1 -9 674.60 -54.4 -52.9 -53.5 63 -99 SPO 1997 10 26 23 37 85 3.9 -9 674.70 -54.4 -53.0 -53.4 63 -99 SPO 1997 10 26 23 38 85 3.8 -9 674.70 -54.4 -52.9 -53.3 63 -99 SPO 1997 10 26 23 39 85 3.8 -9 674.70 -54.4 -52.9 -53.2 63 -99 SPO 1997 10 26 23 40 84 3.8 -9 674.70 -54.4 -52.9 -53.2 63 -99 SPO 1997 10 26 23 41 84 3.7 -9 674.60 -54.4 -52.7 -53.2 65 -99 SPO 1997 10 26 23 42 84 3.9 -9 674.60 -54.4 -52.7 -53.2 65 -99 SPO 1997 10 26 23 43 82 4.0 -9 674.60 -54.4 -52.7 -53.2 65 -99 SPO 1997 10 26 23 44 82 4.1 -9 674.60 -54.4 -52.7 -53.1 65 -99 SPO 1997 10 26 23 45 81 4.3 -9 674.60 -54.5 -52.7 -53.1 66 -99 SPO 1997 10 26 23 46 81 4.5 -9 674.60 -54.4 -52.5 -53.1 66 -99 SPO 1997 10 26 23 47 82 4.7 -9 674.60 -54.4 -52.5 -53.1 66 -99 SPO 1997 10 26 23 48 82 4.7 -9 674.60 -54.4 -52.5 -53.2 65 -99 SPO 1997 10 26 23 49 82 4.7 -9 674.60 -54.4 -52.5 -53.2 65 -99 SPO 1997 10 26 23 50 83 4.7 -9 674.60 -54.4 -52.5 -53.2 65 -99 SPO 1997 10 26 23 51 85 4.6 -9 674.50 -54.4 -52.5 -53.2 65 -99 SPO 1997 10 26 23 52 87 4.4 -9 674.50 -54.4 -52.5 -53.2 66 -99 SPO 1997 10 26 23 53 88 4.4 -9 674.50 -54.4 -52.5 -53.1 66 -99 SPO 1997 10 26 23 54 89 4.4 -9 674.50 -54.4 -52.5 -53.1 66 -99 SPO 1997 10 26 23 55 90 4.4 -9 674.50 -54.2 -52.5 -53.1 64 -99 SPO 1997 10 26 23 56 91 4.4 -9 674.60 -54.2 -52.5 -53.0 66 -99 SPO 1997 10 26 23 57 91 4.5 -9 674.60 -54.2 -52.5 -53.1 66 -99 SPO 1997 10 26 23 58 92 4.6 -9 674.60 -54.2 -52.5 -53.1 -99 -99 SPO 1997 10 26 23 59 91 4.7 -9 674.60 -54.2 -52.5 -53.1 -99 -99 SPO 1997 10 27 00 00 92 4.7 -9 674.60 -54.3 -52.5 -53.1 -99 0 SPO 1997 10 27 00 01 91 4.8 -9 674.50 -54.2 -52.5 -53.1 -99 -99 SPO 1997 10 27 00 02 91 4.7 -9 674.50 -54.2 -52.4 -53.0 -99 -99 SPO 1997 10 27 00 03 91 4.7 -9 674.50 -54.2 -52.4 -53.0 66 -99 SPO 1997 10 27 00 04 91 4.6 -9 674.60 -54.2 -52.4 -53.0 65 -99 SPO 1997 10 27 00 05 93 4.5 -9 674.60 -54.2 -52.4 -53.0 65 -99 SPO 1997 10 27 00 06 94 4.3 -9 674.60 -54.3 -52.4 -53.1 65 -99 SPO 1997 10 27 00 07 96 4.1 -9 674.60 -54.3 -52.5 -53.2 65 -99 SPO 1997 10 27 00 08 97 4.0 -9 674.60 -54.4 -52.5 -53.2 67 -99 SPO 1997 10 27 00 09 95 4.0 -9 674.60 -54.4 -52.5 -53.3 67 -99 SPO 1997 10 27 00 10 93 4.1 -9 674.60 -54.5 -52.5 -53.2 67 -99 SPO 1997 10 27 00 11 93 4.2 -9 674.60 -54.5 -52.5 -53.1 67 -99 SPO 1997 10 27 00 12 92 4.2 -9 674.60 -54.4 -52.4 -53.0 67 -99 SPO 1997 10 27 00 13 92 4.2 -9 674.60 -54.4 -52.4 -52.9 67 -99 SPO 1997 10 27 00 14 93 4.3 -9 674.60 -54.4 -52.4 -52.9 67 -99 SPO 1997 10 27 00 15 93 4.4 -9 674.60 -54.4 -52.5 -52.9 67 -99 SPO 1997 10 27 00 16 94 4.4 -9 674.60 -54.4 -52.5 -53.0 67 -99 SPO 1997 10 27 00 17 95 4.4 -9 674.60 -54.4 -52.5 -53.0 67 -99 SPO 1997 10 27 00 18 96 4.5 -9 674.60 -54.4 -52.5 -53.0 67 -99 SPO 1997 10 27 00 19 96 4.5 -9 674.60 -54.4 -52.5 -53.1 67 -99 SPO 1997 10 27 00 20 95 4.6 -9 674.60 -54.4 -52.5 -53.1 67 -99 SPO 1997 10 27 00 21 95 4.6 -9 674.50 -54.4 -52.5 -53.1 67 -99 SPO 1997 10 27 00 22 94 4.7 -9 674.50 -54.4 -52.5 -53.1 67 -99 SPO 1997 10 27 00 23 94 4.9 -9 674.60 -54.3 -52.5 -53.1 67 -99 SPO 1997 10 27 00 24 93 5.1 -9 674.60 -54.3 -52.5 -53.1 67 -99 SPO 1997 10 27 00 25 94 5.2 -9 674.60 -54.3 -52.5 -53.2 67 -99 SPO 1997 10 27 00 26 94 5.3 -9 674.60 -54.2 -52.5 -53.2 67 -99 SPO 1997 10 27 00 27 94 5.3 -9 674.60 -54.2 -52.6 -53.2 67 -99 SPO 1997 10 27 00 28 94 5.3 -9 674.60 -54.1 -52.6 -53.2 66 -99 SPO 1997 10 27 00 29 94 5.3 -9 674.60 -54.2 -52.6 -53.2 67 -99 SPO 1997 10 27 00 30 94 5.1 -9 674.60 -54.2 -52.6 -53.2 67 -99 SPO 1997 10 27 00 31 93 5.1 -9 674.60 -54.2 -52.6 -53.2 67 -99 SPO 1997 10 27 00 32 92 5.0 -9 674.60 -54.2 -52.6 -53.3 67 -99 SPO 1997 10 27 00 33 91 5.0 -9 674.60 -54.2 -52.6 -53.4 66 -99 SPO 1997 10 27 00 34 91 5.0 -9 674.60 -54.2 -52.6 -53.5 66 -99 SPO 1997 10 27 00 35 91 5.1 -9 674.60 -54.2 -52.6 -53.5 66 -99 SPO 1997 10 27 00 36 91 5.0 -9 674.60 -54.2 -52.6 -53.6 66 -99 SPO 1997 10 27 00 37 90 5.0 -9 674.60 -54.2 -52.5 -53.6 66 -99 SPO 1997 10 27 00 38 89 5.0 -9 674.60 -54.2 -52.5 -53.6 67 -99 SPO 1997 10 27 00 39 88 5.0 -9 674.60 -54.2 -52.5 -53.7 67 -99 SPO 1997 10 27 00 40 88 5.1 -9 674.60 -54.2 -52.5 -53.6 67 -99 SPO 1997 10 27 00 41 87 5.1 -9 674.50 -54.1 -52.4 -53.6 66 -99 SPO 1997 10 27 00 42 87 5.3 -9 674.50 -54.1 -52.4 -53.6 67 -99 SPO 1997 10 27 00 43 87 5.5 -9 674.50 -54.0 -52.4 -53.5 65 -99 SPO 1997 10 27 00 44 87 5.7 -9 674.50 -54.0 -52.3 -53.4 65 -99 SPO 1997 10 27 00 45 87 5.8 -9 674.50 -53.9 -52.4 -53.4 65 -99 SPO 1997 10 27 00 46 86 5.9 -9 674.50 -53.9 -52.4 -53.4 65 -99 SPO 1997 10 27 00 47 87 5.9 -9 674.50 -53.9 -52.4 -53.3 65 -99 SPO 1997 10 27 00 48 87 5.9 -9 674.40 -53.9 -52.4 -53.3 65 -99 SPO 1997 10 27 00 49 86 5.8 -9 674.40 -53.9 -52.3 -53.3 65 -99 SPO 1997 10 27 00 50 86 5.8 -9 674.40 -53.9 -52.2 -53.2 66 -99 SPO 1997 10 27 00 51 86 5.6 -9 674.40 -53.9 -52.2 -53.2 66 -99 SPO 1997 10 27 00 52 86 5.6 -9 674.40 -53.9 -52.2 -53.1 66 -99 SPO 1997 10 27 00 53 85 5.4 -9 674.50 -53.9 -52.2 -53.1 66 -99 SPO 1997 10 27 00 54 86 5.3 -9 674.50 -53.9 -52.2 -53.1 66 -99 SPO 1997 10 27 00 55 85 5.1 -9 674.50 -53.9 -52.2 -53.0 66 -99 SPO 1997 10 27 00 56 84 4.9 -9 674.50 -53.9 -52.2 -53.0 66 -99 SPO 1997 10 27 00 57 84 4.7 -9 674.50 -53.9 -52.2 -53.0 66 -99 SPO 1997 10 27 00 58 85 4.7 -9 674.50 -53.9 -52.2 -52.9 65 -99 SPO 1997 10 27 00 59 86 4.8 -9 674.50 -53.9 -52.2 -52.9 65 -99 SPO 1997 10 27 01 00 86 4.7 -9 674.50 -53.9 -52.1 -52.8 64 0 SPO 1997 10 27 01 01 86 4.8 -9 674.50 -53.9 -52.1 -52.8 64 -99 SPO 1997 10 27 01 02 86 4.7 -9 674.50 -53.9 -52.1 -52.8 64 -99 SPO 1997 10 27 01 03 86 4.8 -9 674.50 -53.9 -52.2 -52.8 65 -99 SPO 1997 10 27 01 04 88 4.8 -9 674.50 -53.9 -52.2 -52.8 66 -99 SPO 1997 10 27 01 05 90 4.7 -9 674.50 -53.9 -52.2 -52.8 66 -99 SPO 1997 10 27 01 06 92 4.7 -9 674.50 -54.0 -52.2 -52.8 67 -99 SPO 1997 10 27 01 07 92 4.6 -9 674.50 -54.0 -52.2 -52.8 67 -99 SPO 1997 10 27 01 08 91 4.7 -9 674.50 -54.0 -52.2 -52.8 66 -99 SPO 1997 10 27 01 09 90 4.6 -9 674.60 -54.0 -52.2 -52.8 66 -99 SPO 1997 10 27 01 10 89 4.6 -9 674.60 -54.0 -52.2 -52.8 66 -99 SPO 1997 10 27 01 11 89 4.7 -9 674.60 -54.0 -52.2 -52.8 66 -99 SPO 1997 10 27 01 12 89 4.8 -9 674.60 -54.1 -52.2 -52.8 67 -99 SPO 1997 10 27 01 13 88 4.8 -9 674.60 -54.2 -52.2 -52.9 67 -99 SPO 1997 10 27 01 14 88 4.8 -9 674.60 -54.2 -52.2 -52.9 66 -99 SPO 1997 10 27 01 15 88 4.7 -9 674.60 -54.2 -52.1 -52.8 66 -99 SPO 1997 10 27 01 16 87 4.8 -9 674.60 -54.2 -52.1 -52.9 66 -99 SPO 1997 10 27 01 17 87 4.8 -9 674.60 -54.2 -52.0 -52.9 66 -99 SPO 1997 10 27 01 18 87 4.8 -9 674.60 -54.2 -52.0 -52.9 66 -99 SPO 1997 10 27 01 19 88 5.0 -9 674.50 -54.2 -52.0 -52.9 66 -99 SPO 1997 10 27 01 20 89 5.1 -9 674.50 -54.2 -52.0 -52.9 66 -99 SPO 1997 10 27 01 21 90 5.2 -9 674.50 -54.1 -52.0 -53.0 65 -99 SPO 1997 10 27 01 22 89 5.3 -9 674.50 -54.1 -52.0 -53.0 66 -99 SPO 1997 10 27 01 23 89 5.3 -9 674.50 -54.0 -52.0 -53.0 65 -99 SPO 1997 10 27 01 24 90 5.4 -9 674.50 -54.0 -52.0 -53.0 65 -99 SPO 1997 10 27 01 25 91 5.4 -9 674.50 -54.0 -52.0 -53.0 66 -99 SPO 1997 10 27 01 26 91 5.5 -9 674.50 -54.0 -52.0 -53.0 65 -99 SPO 1997 10 27 01 27 92 5.6 -9 674.40 -53.9 -51.9 -53.0 64 -99 SPO 1997 10 27 01 28 93 5.7 -9 674.40 -53.9 -51.9 -53.0 64 -99 SPO 1997 10 27 01 29 92 5.7 -9 674.40 -53.9 -51.9 -53.0 64 -99 SPO 1997 10 27 01 30 91 5.7 -9 674.40 -53.9 -51.9 -53.0 64 -99 SPO 1997 10 27 01 31 91 5.7 -9 674.40 -53.8 -52.0 -53.0 64 -99 SPO 1997 10 27 01 32 91 5.5 -9 674.40 -53.9 -52.0 -52.9 65 -99 SPO 1997 10 27 01 33 93 5.3 -9 674.40 -53.9 -52.0 -52.9 66 -99 SPO 1997 10 27 01 34 95 5.2 -9 674.40 -53.8 -52.1 -52.9 65 -99 SPO 1997 10 27 01 35 96 5.0 -9 674.40 -53.9 -52.2 -52.9 65 -99 SPO 1997 10 27 01 36 96 4.9 -9 674.40 -53.9 -52.2 -52.9 65 -99 SPO 1997 10 27 01 37 95 4.9 -9 674.40 -54.0 -52.3 -52.8 65 -99 SPO 1997 10 27 01 38 94 4.8 -9 674.40 -53.9 -52.4 -52.8 65 -99 SPO 1997 10 27 01 39 95 4.8 -9 674.40 -53.9 -52.4 -52.8 65 -99 SPO 1997 10 27 01 40 97 4.8 -9 674.40 -54.0 -52.4 -52.8 65 -99 SPO 1997 10 27 01 41 99 4.7 -9 674.40 -54.0 -52.4 -52.9 65 -99 SPO 1997 10 27 01 42 100 4.7 -9 674.40 -54.0 -52.4 -52.9 65 -99 SPO 1997 10 27 01 43 99 4.6 -9 674.40 -54.0 -52.4 -52.9 65 -99 SPO 1997 10 27 01 44 100 4.5 -9 674.40 -54.0 -52.4 -52.9 65 -99 SPO 1997 10 27 01 45 99 4.6 -9 674.40 -54.1 -52.4 -53.0 66 -99 SPO 1997 10 27 01 46 101 4.6 -9 674.40 -54.1 -52.5 -53.0 66 -99 SPO 1997 10 27 01 47 100 4.5 -9 674.40 -54.1 -52.4 -53.1 65 -99 SPO 1997 10 27 01 48 100 4.5 -9 674.40 -54.1 -52.5 -53.0 65 -99 SPO 1997 10 27 01 49 101 4.5 -9 674.40 -54.2 -52.5 -53.0 66 -99 SPO 1997 10 27 01 50 100 4.5 -9 674.40 -54.2 -52.5 -53.0 66 -99 SPO 1997 10 27 01 51 99 4.4 -9 674.40 -54.2 -52.6 -53.0 66 -99 SPO 1997 10 27 01 52 99 4.4 -9 674.40 -54.2 -52.6 -52.9 66 -99 SPO 1997 10 27 01 53 99 4.3 -9 674.40 -54.3 -52.7 -52.9 67 -99 SPO 1997 10 27 01 54 99 4.3 -9 674.40 -54.3 -52.7 -52.9 66 -99 SPO 1997 10 27 01 55 99 4.4 -9 674.40 -54.3 -52.7 -53.0 65 -99 SPO 1997 10 27 01 56 98 4.4 -9 674.40 -54.3 -52.7 -52.9 65 -99 SPO 1997 10 27 01 57 97 4.4 -9 674.50 -54.3 -52.7 -52.9 65 -99 SPO 1997 10 27 01 58 96 4.2 -9 674.50 -54.3 -52.7 -52.9 65 -99 SPO 1997 10 27 01 59 95 4.1 -9 674.60 -54.3 -52.7 -52.9 66 -99 SPO 1997 10 27 02 00 96 3.9 -9 674.60 -54.3 -52.8 -52.9 66 0 SPO 1997 10 27 02 01 97 4.1 -9 674.50 -54.3 -52.8 -52.8 66 -99 SPO 1997 10 27 02 02 97 4.2 -9 674.50 -54.3 -52.7 -52.9 66 -99 SPO 1997 10 27 02 03 98 4.3 -9 674.50 -54.4 -52.7 -53.0 67 -99 SPO 1997 10 27 02 04 98 4.3 -9 674.50 -54.4 -52.6 -53.0 67 -99 SPO 1997 10 27 02 05 97 4.3 -9 674.50 -54.4 -52.5 -53.0 67 -99 SPO 1997 10 27 02 06 95 4.3 -9 674.50 -54.4 -52.4 -53.0 67 -99 SPO 1997 10 27 02 07 94 4.3 -9 674.50 -54.4 -52.4 -53.0 66 -99 SPO 1997 10 27 02 08 94 4.4 -9 674.50 -54.5 -52.3 -53.0 66 -99 SPO 1997 10 27 02 09 93 4.6 -9 674.50 -54.5 -52.4 -53.0 65 -99 SPO 1997 10 27 02 10 93 4.8 -9 674.50 -54.5 -52.3 -53.1 64 -99 SPO 1997 10 27 02 11 91 4.8 -9 674.50 -54.4 -52.3 -53.1 63 -99 SPO 1997 10 27 02 12 89 4.7 -9 674.50 -54.5 -52.2 -53.1 65 -99 SPO 1997 10 27 02 13 88 4.6 -9 674.50 -54.4 -52.2 -53.1 64 -99 SPO 1997 10 27 02 14 89 4.6 -9 674.50 -54.4 -52.1 -53.1 66 -99 SPO 1997 10 27 02 15 89 4.7 -9 674.40 -54.4 -52.1 -53.0 66 -99 SPO 1997 10 27 02 16 88 4.9 -9 674.40 -54.4 -52.1 -53.0 66 -99 SPO 1997 10 27 02 17 86 4.9 -9 674.40 -54.3 -52.1 -53.1 65 -99 SPO 1997 10 27 02 18 85 4.9 -9 674.40 -54.3 -52.1 -53.2 66 -99 SPO 1997 10 27 02 19 84 4.8 -9 674.40 -54.3 -52.1 -53.2 66 -99 SPO 1997 10 27 02 20 85 4.7 -9 674.40 -54.3 -52.1 -53.2 66 -99 SPO 1997 10 27 02 21 83 4.7 -9 674.40 -54.2 -52.1 -53.2 65 -99 SPO 1997 10 27 02 22 81 4.6 -9 674.40 -54.2 -52.1 -53.3 65 -99 SPO 1997 10 27 02 23 82 4.6 -9 674.40 -54.2 -52.2 -53.3 65 -99 SPO 1997 10 27 02 24 83 4.6 -9 674.40 -54.3 -52.1 -53.3 66 -99 SPO 1997 10 27 02 25 85 4.7 -9 674.40 -54.3 -52.1 -53.2 66 -99 SPO 1997 10 27 02 26 84 4.6 -9 674.40 -54.3 -52.1 -53.1 66 -99 SPO 1997 10 27 02 27 83 4.6 -9 674.40 -54.3 -52.0 -53.1 66 -99 SPO 1997 10 27 02 28 85 4.8 -9 674.40 -54.4 -52.0 -53.1 67 -99 SPO 1997 10 27 02 29 85 4.7 -9 674.40 -54.4 -52.2 -53.1 67 -99 SPO 1997 10 27 02 30 87 4.7 -9 674.40 -54.4 -52.2 -53.0 67 -99 SPO 1997 10 27 02 31 88 4.7 -9 674.40 -54.4 -52.3 -53.0 67 -99 SPO 1997 10 27 02 32 89 4.6 -9 674.40 -54.4 -52.3 -53.0 66 -99 SPO 1997 10 27 02 33 89 4.5 -9 674.40 -54.4 -52.3 -52.9 66 -99 SPO 1997 10 27 02 34 91 4.4 -9 674.40 -54.4 -52.3 -52.9 66 -99 SPO 1997 10 27 02 35 92 4.5 -9 674.30 -54.4 -52.3 -52.9 64 -99 SPO 1997 10 27 02 36 93 4.6 -9 674.30 -54.4 -52.3 -52.9 64 -99 SPO 1997 10 27 02 37 93 4.5 -9 674.30 -54.4 -52.3 -52.9 63 -99 SPO 1997 10 27 02 38 94 4.3 -9 674.30 -54.4 -52.3 -52.9 63 -99 SPO 1997 10 27 02 39 95 4.2 -9 674.30 -54.4 -52.2 -52.8 63 -99 SPO 1997 10 27 02 40 96 4.0 -9 674.30 -54.4 -52.2 -52.8 64 -99 SPO 1997 10 27 02 41 95 3.8 -9 674.40 -54.4 -52.2 -52.7 64 -99 SPO 1997 10 27 02 42 95 3.8 -9 674.40 -54.4 -52.3 -52.6 66 -99 SPO 1997 10 27 02 43 96 3.9 -9 674.30 -54.4 -52.3 -52.6 66 -99 SPO 1997 10 27 02 44 96 4.1 -9 674.30 -54.4 -52.2 -52.7 66 -99 SPO 1997 10 27 02 45 96 4.0 -9 674.30 -54.4 -52.1 -52.7 66 -99 SPO 1997 10 27 02 46 95 4.0 -9 674.30 -54.4 -52.1 -52.7 66 -99 SPO 1997 10 27 02 47 94 4.0 -9 674.30 -54.4 -52.1 -52.7 66 -99 SPO 1997 10 27 02 48 93 3.9 -9 674.30 -54.4 -52.2 -52.6 64 -99 SPO 1997 10 27 02 49 92 3.8 -9 674.30 -54.5 -52.2 -52.6 65 -99 SPO 1997 10 27 02 50 93 3.8 -9 674.30 -54.5 -52.3 -52.6 65 -99 SPO 1997 10 27 02 51 93 3.8 -9 674.40 -54.5 -52.3 -52.6 65 -99 SPO 1997 10 27 02 52 93 3.7 -9 674.40 -54.5 -52.4 -52.6 66 -99 SPO 1997 10 27 02 53 93 3.7 -9 674.40 -54.5 -52.3 -52.5 66 -99 SPO 1997 10 27 02 54 92 3.7 -9 674.40 -54.5 -52.3 -52.4 66 -99 SPO 1997 10 27 02 55 91 3.7 -9 674.40 -54.4 -52.3 -52.4 66 -99 SPO 1997 10 27 02 56 90 3.6 -9 674.40 -54.4 -52.3 -52.4 66 -99 SPO 1997 10 27 02 57 88 3.7 -9 674.40 -54.4 -52.4 -52.4 67 -99 SPO 1997 10 27 02 58 88 3.7 -9 674.40 -54.4 -52.4 -52.4 67 -99 SPO 1997 10 27 02 59 88 3.7 -9 674.40 -54.5 -52.3 -52.4 67 -99 SPO 1997 10 27 03 00 87 3.8 -9 674.40 -54.5 -52.4 -52.4 67 0 SPO 1997 10 27 03 01 87 3.8 -9 674.40 -54.4 -52.4 -52.4 67 -99 SPO 1997 10 27 03 02 87 4.0 -9 674.40 -54.4 -52.3 -52.4 66 -99 SPO 1997 10 27 03 03 85 4.2 -9 674.40 -54.4 -52.3 -52.4 64 -99 SPO 1997 10 27 03 04 85 4.4 -9 674.40 -54.4 -52.2 -52.6 64 -99 SPO 1997 10 27 03 05 86 4.4 -9 674.30 -54.4 -52.1 -52.6 64 -99 SPO 1997 10 27 03 06 87 4.5 -9 674.30 -54.5 -52.1 -52.7 66 -99 SPO 1997 10 27 03 07 86 4.6 -9 674.30 -54.4 -52.2 -52.7 66 -99 SPO 1997 10 27 03 08 87 4.8 -9 674.30 -54.4 -52.2 -52.8 66 -99 SPO 1997 10 27 03 09 87 4.9 -9 674.30 -54.4 -52.2 -52.8 67 -99 SPO 1997 10 27 03 10 88 5.0 -9 674.30 -54.4 -52.2 -52.9 67 -99 SPO 1997 10 27 03 11 89 5.1 -9 674.30 -54.4 -52.1 -52.9 67 -99 SPO 1997 10 27 03 12 89 5.1 -9 674.30 -54.3 -52.1 -53.0 66 -99 SPO 1997 10 27 03 13 90 5.0 -9 674.30 -54.3 -52.1 -53.0 66 -99 SPO 1997 10 27 03 14 90 4.6 -9 674.40 -54.3 -52.2 -52.9 67 -99 SPO 1997 10 27 03 15 91 4.3 -9 674.40 -54.3 -52.3 -52.8 66 -99 SPO 1997 10 27 03 16 91 4.2 -9 674.40 -54.4 -52.4 -52.8 66 -99 SPO 1997 10 27 03 17 93 4.2 -9 674.40 -54.3 -52.4 -52.8 65 -99 SPO 1997 10 27 03 18 93 4.4 -9 674.40 -54.3 -52.4 -52.8 65 -99 SPO 1997 10 27 03 19 94 4.5 -9 674.40 -54.3 -52.3 -52.8 63 -99 SPO 1997 10 27 03 20 95 4.5 -9 674.40 -54.3 -52.3 -52.8 65 -99 SPO 1997 10 27 03 21 95 4.4 -9 674.40 -54.3 -52.3 -52.8 65 -99 SPO 1997 10 27 03 22 97 4.5 -9 674.40 -54.3 -52.4 -52.8 66 -99 SPO 1997 10 27 03 23 98 4.5 -9 674.40 -54.3 -52.4 -52.9 66 -99 SPO 1997 10 27 03 24 97 4.5 -9 674.40 -54.3 -52.3 -52.9 66 -99 SPO 1997 10 27 03 25 96 4.4 -9 674.30 -54.3 -52.3 -52.9 66 -99 SPO 1997 10 27 03 26 95 4.4 -9 674.30 -54.3 -52.3 -52.8 66 -99 SPO 1997 10 27 03 27 94 4.4 -9 674.30 -54.3 -52.3 -52.8 65 -99 SPO 1997 10 27 03 28 93 4.5 -9 674.30 -54.3 -52.3 -52.8 65 -99 SPO 1997 10 27 03 29 93 4.5 -9 674.30 -54.2 -52.2 -52.8 63 -99 SPO 1997 10 27 03 30 94 4.4 -9 674.30 -54.2 -52.1 -52.8 63 -99 SPO 1997 10 27 03 31 94 4.3 -9 674.30 -54.2 -52.1 -52.8 63 -99 SPO 1997 10 27 03 32 95 4.3 -9 674.30 -54.2 -52.0 -52.7 64 -99 SPO 1997 10 27 03 33 95 4.5 -9 674.30 -54.2 -52.0 -52.7 65 -99 SPO 1997 10 27 03 34 96 4.6 -9 674.30 -54.1 -51.9 -52.8 65 -99 SPO 1997 10 27 03 35 96 4.7 -9 674.30 -54.1 -51.9 -52.8 66 -99 SPO 1997 10 27 03 36 96 4.7 -9 674.30 -54.1 -51.9 -52.8 66 -99 SPO 1997 10 27 03 37 97 4.6 -9 674.30 -54.0 -51.9 -52.8 65 -99 SPO 1997 10 27 03 38 98 4.7 -9 674.30 -54.0 -51.9 -52.8 66 -99 SPO 1997 10 27 03 39 99 4.7 -9 674.30 -54.0 -51.8 -52.8 66 -99 SPO 1997 10 27 03 40 100 4.8 -9 674.30 -54.0 -51.8 -52.9 66 -99 SPO 1997 10 27 03 41 99 4.7 -9 674.30 -54.0 -51.7 -52.9 66 -99 SPO 1997 10 27 03 42 99 4.6 -9 674.30 -53.9 -51.8 -52.9 65 -99 SPO 1997 10 27 03 43 100 4.5 -9 674.30 -54.0 -51.9 -52.9 65 -99 SPO 1997 10 27 03 44 100 4.5 -9 674.30 -53.9 -51.8 -52.8 64 -99 SPO 1997 10 27 03 45 99 4.7 -9 674.30 -53.9 -51.8 -52.8 64 -99 SPO 1997 10 27 03 46 98 4.8 -9 674.30 -53.9 -51.8 -52.7 65 -99 SPO 1997 10 27 03 47 96 5.0 -9 674.30 -53.9 -51.8 -52.6 66 -99 SPO 1997 10 27 03 48 96 5.0 -9 674.30 -53.8 -51.8 -52.6 65 -99 SPO 1997 10 27 03 49 95 5.2 -9 674.30 -53.8 -51.7 -52.6 66 -99 SPO 1997 10 27 03 50 95 5.3 -9 674.30 -53.8 -51.7 -52.7 66 -99 SPO 1997 10 27 03 51 95 5.4 -9 674.30 -53.9 -51.7 -52.7 67 -99 SPO 1997 10 27 03 52 95 5.3 -9 674.30 -53.9 -51.6 -52.7 67 -99 SPO 1997 10 27 03 53 95 5.2 -9 674.30 -53.9 -51.7 -52.7 66 -99 SPO 1997 10 27 03 54 96 5.2 -9 674.30 -53.9 -51.8 -52.7 66 -99 SPO 1997 10 27 03 55 96 4.9 -9 674.30 -53.9 -51.9 -52.7 66 -99 SPO 1997 10 27 03 56 95 4.5 -9 674.30 -54.0 -52.0 -52.6 67 -99 SPO 1997 10 27 03 57 94 4.0 -9 674.30 -54.0 -52.0 -52.5 66 -99 SPO 1997 10 27 03 58 93 3.3 -9 674.30 -54.0 -52.2 -52.3 66 -99 SPO 1997 10 27 03 59 91 2.8 -9 674.30 -54.0 -52.2 -52.1 66 -99 SPO 1997 10 27 04 00 90 2.3 -9 674.40 -54.0 -52.4 -51.8 67 0 SPO 1997 10 27 04 01 91 1.8 -9 674.40 -54.0 -52.5 -51.6 67 -99 SPO 1997 10 27 04 02 95 2.2 -9 674.40 -54.0 -52.6 -51.2 68 -99 SPO 1997 10 27 04 03 92 2.2 -9 674.40 -53.9 -52.5 -51.1 68 -99 SPO 1997 10 27 04 04 87 2.5 -9 674.40 -53.9 -52.5 -51.2 68 -99 SPO 1997 10 27 04 05 86 2.8 -9 674.40 -53.9 -52.5 -51.4 69 -99 SPO 1997 10 27 04 06 88 3.0 -9 674.40 -53.9 -52.4 -51.5 69 -99 SPO 1997 10 27 04 07 89 3.0 -9 674.30 -53.9 -52.4 -51.5 69 -99 SPO 1997 10 27 04 08 89 3.1 -9 674.30 -53.9 -52.4 -51.6 68 -99 SPO 1997 10 27 04 09 89 3.0 -9 674.30 -54.0 -52.3 -51.6 69 -99 SPO 1997 10 27 04 10 89 3.1 -9 674.30 -54.0 -52.3 -51.6 68 -99 SPO 1997 10 27 04 11 90 3.3 -9 674.30 -54.0 -52.3 -51.6 68 -99 SPO 1997 10 27 04 12 90 3.5 -9 674.30 -54.0 -52.3 -51.7 67 -99 SPO 1997 10 27 04 13 91 3.6 -9 674.30 -54.0 -52.3 -51.8 67 -99 SPO 1997 10 27 04 14 92 3.7 -9 674.30 -54.1 -52.2 -51.8 67 -99 SPO 1997 10 27 04 15 93 3.7 -9 674.30 -54.1 -52.2 -51.9 67 -99 SPO 1997 10 27 04 16 94 3.7 -9 674.30 -54.1 -52.2 -52.0 67 -99 SPO 1997 10 27 04 17 93 3.5 -9 674.30 -54.1 -52.3 -52.0 67 -99 SPO 1997 10 27 04 18 92 3.3 -9 674.30 -54.2 -52.4 -52.0 67 -99 SPO 1997 10 27 04 19 90 3.3 -9 674.30 -54.2 -52.5 -51.9 67 -99 SPO 1997 10 27 04 20 90 3.3 -9 674.30 -54.2 -52.5 -51.9 67 -99 SPO 1997 10 27 04 21 90 3.2 -9 674.30 -54.2 -52.6 -51.9 67 -99 SPO 1997 10 27 04 22 89 3.2 -9 674.30 -54.2 -52.6 -51.9 67 -99 SPO 1997 10 27 04 23 87 3.3 -9 674.30 -54.2 -52.5 -51.9 67 -99 SPO 1997 10 27 04 24 87 3.5 -9 674.30 -54.2 -52.4 -52.0 67 -99 SPO 1997 10 27 04 25 88 3.6 -9 674.30 -54.3 -52.2 -52.0 67 -99 SPO 1997 10 27 04 26 89 3.9 -9 674.30 -54.3 -52.2 -52.1 67 -99 SPO 1997 10 27 04 27 89 4.3 -9 674.20 -54.3 -52.1 -52.2 67 -99 SPO 1997 10 27 04 28 89 4.7 -9 674.20 -54.3 -52.0 -52.4 66 -99 SPO 1997 10 27 04 29 90 5.1 -9 674.20 -54.2 -52.0 -52.6 64 -99 SPO 1997 10 27 04 30 91 5.2 -9 674.20 -54.2 -51.8 -52.7 64 -99 SPO 1997 10 27 04 31 91 5.2 -9 674.20 -54.2 -51.7 -52.8 65 -99 SPO 1997 10 27 04 32 91 5.1 -9 674.20 -54.3 -51.7 -52.8 66 -99 SPO 1997 10 27 04 33 90 5.0 -9 674.20 -54.3 -51.7 -52.8 66 -99 SPO 1997 10 27 04 34 88 4.7 -9 674.20 -54.3 -51.8 -52.8 67 -99 SPO 1997 10 27 04 35 87 4.4 -9 674.20 -54.2 -51.8 -52.8 66 -99 SPO 1997 10 27 04 36 84 4.2 -9 674.20 -54.2 -51.9 -52.8 66 -99 SPO 1997 10 27 04 37 84 4.1 -9 674.20 -54.1 -52.0 -53.0 66 -99 SPO 1997 10 27 04 38 86 4.3 -9 674.20 -54.0 -51.9 -53.1 65 -99 SPO 1997 10 27 04 39 87 4.4 -9 674.20 -54.0 -51.8 -53.1 66 -99 SPO 1997 10 27 04 40 87 4.5 -9 674.20 -53.9 -51.7 -53.1 65 -99 SPO 1997 10 27 04 41 87 4.8 -9 674.20 -53.9 -51.7 -53.0 66 -99 SPO 1997 10 27 04 42 86 4.8 -9 674.20 -53.8 -51.6 -53.0 64 -99 SPO 1997 10 27 04 43 86 4.8 -9 674.20 -53.9 -51.6 -53.0 65 -99 SPO 1997 10 27 04 44 85 4.6 -9 674.20 -53.8 -51.6 -53.0 64 -99 SPO 1997 10 27 04 45 85 4.6 -9 674.20 -53.9 -51.6 -53.0 64 -99 SPO 1997 10 27 04 46 84 4.5 -9 674.20 -53.9 -51.7 -53.1 64 -99 SPO 1997 10 27 04 47 84 4.5 -9 674.20 -54.0 -51.8 -53.1 65 -99 SPO 1997 10 27 04 48 85 4.6 -9 674.20 -54.0 -51.9 -53.1 65 -99 SPO 1997 10 27 04 49 85 4.8 -9 674.20 -54.0 -51.8 -53.0 65 -99 SPO 1997 10 27 04 50 84 4.9 -9 674.20 -54.0 -51.8 -53.0 66 -99 SPO 1997 10 27 04 51 83 4.9 -9 674.20 -54.0 -51.8 -53.2 65 -99 SPO 1997 10 27 04 52 81 4.9 -9 674.20 -54.1 -51.8 -53.3 67 -99 SPO 1997 10 27 04 53 80 5.0 -9 674.10 -54.0 -51.8 -53.3 66 -99 SPO 1997 10 27 04 54 81 5.2 -9 674.10 -54.0 -51.8 -53.4 65 -99 SPO 1997 10 27 04 55 80 5.2 -9 674.10 -53.9 -51.7 -53.3 64 -99 SPO 1997 10 27 04 56 78 5.2 -9 674.10 -53.9 -51.7 -53.4 65 -99 SPO 1997 10 27 04 57 78 5.4 -9 674.10 -53.9 -51.6 -53.4 64 -99 SPO 1997 10 27 04 58 79 5.5 -9 674.10 -53.9 -51.6 -53.4 64 -99 SPO 1997 10 27 04 59 79 5.6 -9 674.10 -53.9 -51.6 -53.4 64 -99 SPO 1997 10 27 05 00 77 5.6 -9 674.10 -53.8 -51.6 -53.4 64 0 SPO 1997 10 27 05 01 77 5.6 -9 674.00 -53.8 -51.6 -53.4 64 -99 SPO 1997 10 27 05 02 76 5.7 -9 674.00 -53.8 -51.6 -53.5 64 -99 SPO 1997 10 27 05 03 75 5.9 -9 674.00 -53.8 -51.6 -53.5 64 -99 SPO 1997 10 27 05 04 74 5.8 -9 674.00 -53.8 -51.6 -53.4 64 -99 SPO 1997 10 27 05 05 74 6.0 -9 674.00 -53.7 -51.6 -53.4 64 -99 SPO 1997 10 27 05 06 73 6.1 -9 674.00 -53.7 -51.6 -53.4 64 -99 SPO 1997 10 27 05 07 74 6.0 -9 674.00 -53.7 -51.5 -53.4 64 -99 SPO 1997 10 27 05 08 73 5.9 -9 674.00 -53.6 -51.5 -53.4 64 -99 SPO 1997 10 27 05 09 74 5.8 -9 674.00 -53.6 -51.4 -53.4 64 -99 SPO 1997 10 27 05 10 74 5.8 -9 674.00 -53.6 -51.5 -53.3 64 -99 SPO 1997 10 27 05 11 74 5.8 -9 674.00 -53.5 -51.5 -53.3 63 -99 SPO 1997 10 27 05 12 73 5.8 -9 674.00 -53.5 -51.4 -53.3 63 -99 SPO 1997 10 27 05 13 73 5.8 -9 674.00 -53.4 -51.5 -53.2 63 -99 SPO 1997 10 27 05 14 72 5.7 -9 674.00 -53.4 -51.5 -53.2 64 -99 SPO 1997 10 27 05 15 72 5.6 -9 674.00 -53.4 -51.6 -53.2 64 -99 SPO 1997 10 27 05 16 71 5.7 -9 674.10 -53.4 -51.6 -53.2 64 -99 SPO 1997 10 27 05 17 71 5.8 -9 674.10 -53.4 -51.6 -53.2 64 -99 SPO 1997 10 27 05 18 71 5.6 -9 674.10 -53.4 -51.7 -53.2 65 -99 SPO 1997 10 27 05 19 71 5.5 -9 674.10 -53.3 -51.8 -53.1 64 -99 SPO 1997 10 27 05 20 71 5.6 -9 674.10 -53.3 -51.8 -53.1 64 -99 SPO 1997 10 27 05 21 70 5.4 -9 674.10 -53.3 -51.8 -53.0 64 -99 SPO 1997 10 27 05 22 68 5.3 -9 674.10 -53.3 -51.8 -53.0 64 -99 SPO 1997 10 27 05 23 68 5.4 -9 674.10 -53.2 -51.9 -53.0 64 -99 SPO 1997 10 27 05 24 68 5.3 -9 674.10 -53.1 -51.9 -52.9 63 -99 SPO 1997 10 27 05 25 69 5.5 -9 674.10 -53.1 -51.9 -52.9 63 -99 SPO 1997 10 27 05 26 69 5.5 -9 674.10 -53.2 -51.9 -52.9 64 -99 SPO 1997 10 27 05 27 69 5.4 -9 674.10 -53.2 -51.9 -52.9 64 -99 SPO 1997 10 27 05 28 70 5.5 -9 674.10 -53.2 -51.9 -52.9 64 -99 SPO 1997 10 27 05 29 71 5.5 -9 674.10 -53.1 -51.8 -52.9 64 -99 SPO 1997 10 27 05 30 71 5.4 -9 674.10 -53.1 -51.8 -52.9 64 -99 SPO 1997 10 27 05 31 71 5.3 -9 674.10 -53.1 -51.8 -52.9 64 -99 SPO 1997 10 27 05 32 71 5.2 -9 674.10 -53.2 -51.9 -52.9 64 -99 SPO 1997 10 27 05 33 70 5.2 -9 674.10 -53.2 -51.9 -52.9 64 -99 SPO 1997 10 27 05 34 70 5.0 -9 674.10 -53.2 -51.8 -52.9 64 -99 SPO 1997 10 27 05 35 70 4.7 -9 674.10 -53.2 -51.8 -52.8 64 -99 SPO 1997 10 27 05 36 71 4.6 -9 674.10 -53.3 -51.9 -52.8 64 -99 SPO 1997 10 27 05 37 70 4.8 -9 674.10 -53.3 -51.9 -52.8 64 -99 SPO 1997 10 27 05 38 69 4.7 -9 674.10 -53.3 -51.9 -52.8 63 -99 SPO 1997 10 27 05 39 70 4.6 -9 674.10 -53.3 -51.9 -52.8 63 -99 SPO 1997 10 27 05 40 71 4.5 -9 674.10 -53.3 -52.0 -52.8 63 -99 SPO 1997 10 27 05 41 71 4.3 -9 674.10 -53.3 -52.0 -52.8 63 -99 SPO 1997 10 27 05 42 72 4.3 -9 674.10 -53.3 -52.1 -52.8 63 -99 SPO 1997 10 27 05 43 73 4.5 -9 674.10 -53.3 -52.1 -52.8 63 -99 SPO 1997 10 27 05 44 74 4.6 -9 674.10 -53.3 -52.1 -52.8 64 -99 SPO 1997 10 27 05 45 74 4.7 -9 674.10 -53.3 -52.0 -52.7 64 -99 SPO 1997 10 27 05 46 75 4.6 -9 674.10 -53.3 -52.1 -52.7 64 -99 SPO 1997 10 27 05 47 76 4.6 -9 674.10 -53.3 -52.1 -52.7 64 -99 SPO 1997 10 27 05 48 79 4.6 -9 674.10 -53.4 -52.1 -52.7 65 -99 SPO 1997 10 27 05 49 82 4.6 -9 674.10 -53.4 -52.2 -52.6 65 -99 SPO 1997 10 27 05 50 82 4.4 -9 674.10 -53.4 -52.2 -52.5 64 -99 SPO 1997 10 27 05 51 81 4.4 -9 674.10 -53.5 -52.2 -52.5 65 -99 SPO 1997 10 27 05 52 82 4.3 -9 674.10 -53.5 -52.2 -52.5 64 -99 SPO 1997 10 27 05 53 82 4.4 -9 674.10 -53.5 -52.2 -52.5 64 -99 SPO 1997 10 27 05 54 85 4.5 -9 674.10 -53.6 -52.2 -52.4 64 -99 SPO 1997 10 27 05 55 87 4.3 -9 674.10 -53.6 -52.2 -52.4 64 -99 SPO 1997 10 27 05 56 89 4.2 -9 674.10 -53.7 -52.3 -52.3 64 -99 SPO 1997 10 27 05 57 89 4.3 -9 674.10 -53.7 -52.3 -52.3 64 -99 SPO 1997 10 27 05 58 88 4.3 -9 674.10 -53.7 -52.3 -52.3 64 -99 SPO 1997 10 27 05 59 88 4.3 -9 674.10 -53.7 -52.2 -52.3 64 -99 SPO 1997 10 27 06 00 89 4.2 -9 674.10 -53.8 -52.2 -52.3 65 0 SPO 1997 10 27 06 01 91 4.1 -9 674.10 -53.8 -52.2 -52.3 65 -99 SPO 1997 10 27 06 02 93 4.0 -9 674.10 -53.8 -52.3 -52.3 64 -99 SPO 1997 10 27 06 03 93 4.1 -9 674.10 -53.8 -52.3 -52.3 64 -99 SPO 1997 10 27 06 04 92 4.3 -9 674.10 -53.8 -52.3 -52.3 64 -99 SPO 1997 10 27 06 05 91 4.2 -9 674.10 -53.7 -52.3 -52.3 64 -99 SPO 1997 10 27 06 06 89 4.0 -9 674.10 -53.7 -52.3 -52.2 63 -99 SPO 1997 10 27 06 07 88 3.9 -9 674.10 -53.7 -52.3 -52.2 63 -99 SPO 1997 10 27 06 08 88 3.8 -9 674.10 -53.8 -52.3 -52.1 64 -99 SPO 1997 10 27 06 09 88 3.8 -9 674.10 -53.8 -52.2 -52.1 63 -99 SPO 1997 10 27 06 10 87 3.7 -9 674.20 -53.8 -52.2 -52.1 64 -99 SPO 1997 10 27 06 11 85 3.5 -9 674.20 -53.8 -52.2 -52.1 64 -99 SPO 1997 10 27 06 12 84 3.4 -9 674.20 -53.8 -52.3 -52.1 64 -99 SPO 1997 10 27 06 13 84 3.4 -9 674.20 -53.8 -52.3 -52.1 64 -99 SPO 1997 10 27 06 14 83 3.5 -9 674.20 -53.8 -52.3 -52.1 64 -99 SPO 1997 10 27 06 15 82 3.7 -9 674.20 -53.9 -52.3 -52.2 64 -99 SPO 1997 10 27 06 16 81 3.8 -9 674.10 -53.9 -52.2 -52.2 64 -99 SPO 1997 10 27 06 17 80 3.9 -9 674.20 -53.9 -52.1 -52.4 63 -99 SPO 1997 10 27 06 18 81 4.0 -9 674.20 -54.0 -52.1 -52.6 65 -99 SPO 1997 10 27 06 19 81 4.3 -9 674.10 -54.0 -52.1 -52.6 66 -99 SPO 1997 10 27 06 20 80 4.3 -9 674.10 -54.0 -52.0 -52.7 67 -99 SPO 1997 10 27 06 21 80 4.3 -9 674.10 -53.9 -52.0 -52.7 67 -99 SPO 1997 10 27 06 22 79 4.3 -9 674.10 -53.9 -52.0 -52.7 66 -99 SPO 1997 10 27 06 23 79 4.3 -9 674.10 -53.9 -52.0 -52.7 65 -99 SPO 1997 10 27 06 24 80 4.3 -9 674.20 -53.9 -52.0 -52.6 65 -99 SPO 1997 10 27 06 25 80 4.4 -9 674.20 -53.9 -51.9 -52.6 64 -99 SPO 1997 10 27 06 26 80 4.5 -9 674.20 -53.9 -51.8 -52.6 64 -99 SPO 1997 10 27 06 27 81 4.4 -9 674.20 -53.9 -51.7 -52.6 65 -99 SPO 1997 10 27 06 28 82 4.3 -9 674.20 -53.9 -51.7 -52.5 65 -99 SPO 1997 10 27 06 29 84 4.3 -9 674.20 -53.9 -51.7 -52.4 65 -99 SPO 1997 10 27 06 30 85 4.4 -9 674.20 -53.9 -51.8 -52.4 65 -99 SPO 1997 10 27 06 31 86 4.3 -9 674.20 -54.0 -51.8 -52.3 66 -99 SPO 1997 10 27 06 32 86 4.4 -9 674.20 -54.0 -51.9 -52.3 65 -99 SPO 1997 10 27 06 33 85 4.3 -9 674.20 -54.0 -51.9 -52.3 65 -99 SPO 1997 10 27 06 34 85 4.2 -9 674.20 -54.0 -52.0 -52.3 66 -99 SPO 1997 10 27 06 35 84 4.2 -9 674.20 -54.0 -52.0 -52.3 66 -99 SPO 1997 10 27 06 36 85 4.3 -9 674.20 -54.0 -52.0 -52.3 66 -99 SPO 1997 10 27 06 37 85 4.3 -9 674.20 -53.9 -52.1 -52.3 64 -99 SPO 1997 10 27 06 38 83 4.3 -9 674.10 -53.9 -52.1 -52.4 64 -99 SPO 1997 10 27 06 39 83 4.2 -9 674.10 -54.0 -52.1 -52.4 65 -99 SPO 1997 10 27 06 40 82 4.3 -9 674.20 -54.0 -52.2 -52.5 64 -99 SPO 1997 10 27 06 41 81 4.3 -9 674.20 -54.0 -52.1 -52.6 64 -99 SPO 1997 10 27 06 42 81 4.2 -9 674.20 -54.0 -52.2 -52.6 65 -99 SPO 1997 10 27 06 43 82 4.0 -9 674.20 -54.1 -52.2 -52.6 66 -99 SPO 1997 10 27 06 44 84 3.7 -9 674.20 -54.1 -52.2 -52.5 66 -99 SPO 1997 10 27 06 45 86 3.4 -9 674.20 -54.2 -52.3 -52.3 67 -99 SPO 1997 10 27 06 46 88 3.2 -9 674.20 -54.2 -52.4 -52.0 67 -99 SPO 1997 10 27 06 47 91 2.9 -9 674.20 -54.2 -52.5 -51.8 66 -99 SPO 1997 10 27 06 48 92 2.6 -9 674.20 -54.3 -52.6 -51.6 67 -99 SPO 1997 10 27 06 49 91 2.5 -9 674.20 -54.3 -52.7 -51.5 67 -99 SPO 1997 10 27 06 50 90 2.6 -9 674.20 -54.3 -52.8 -51.4 67 -99 SPO 1997 10 27 06 51 92 2.4 -9 674.20 -54.3 -52.8 -51.3 67 -99 SPO 1997 10 27 06 52 90 2.2 -9 674.20 -54.3 -52.9 -51.0 67 -99 SPO 1997 10 27 06 53 88 2.0 -9 674.30 -54.2 -52.9 -51.1 66 -99 SPO 1997 10 27 06 54 85 1.9 -9 674.30 -54.3 -53.0 -51.0 67 -99 SPO 1997 10 27 06 55 83 1.8 -9 674.30 -54.4 -53.0 -50.9 68 -99 SPO 1997 10 27 06 56 83 1.9 -9 674.30 -54.3 -53.1 -50.8 67 -99 SPO 1997 10 27 06 57 85 1.6 -9 674.30 -54.2 -53.1 -50.4 68 -99 SPO 1997 10 27 06 58 83 1.2 -9 674.30 -54.2 -53.1 -50.0 69 -99 SPO 1997 10 27 06 59 83 1.0 -9 674.30 -54.1 -53.0 -49.4 70 -99 SPO 1997 10 27 07 00 90 0.5 -9 674.30 -54.0 -53.1 -48.8 71 0 SPO 1997 10 27 07 01 89 0.6 -9 674.30 -54.1 -53.2 -48.5 72 -99 SPO 1997 10 27 07 02 77 0.7 -9 674.30 -54.1 -53.2 -48.2 73 -99 SPO 1997 10 27 07 03 75 0.9 -9 674.30 -54.0 -53.2 -47.8 74 -99 SPO 1997 10 27 07 04 77 1.0 -9 674.30 -54.0 -53.2 -47.8 77 -99 SPO 1997 10 27 07 05 76 1.3 -9 674.30 -54.1 -53.2 -48.5 78 -99 SPO 1997 10 27 07 06 78 1.4 -9 674.30 -54.2 -53.1 -49.2 78 -99 SPO 1997 10 27 07 07 75 1.5 -9 674.30 -54.2 -53.2 -49.6 76 -99 SPO 1997 10 27 07 08 80 1.4 -9 674.30 -54.2 -53.2 -49.3 75 -99 SPO 1997 10 27 07 09 88 1.4 -9 674.30 -54.1 -53.3 -48.8 73 -99 SPO 1997 10 27 07 10 91 1.3 -9 674.30 -54.1 -53.3 -48.4 73 -99 SPO 1997 10 27 07 11 99 1.1 -9 674.30 -54.0 -53.3 -48.5 72 -99 SPO 1997 10 27 07 12 101 1.1 -9 674.30 -53.7 -53.3 -49.2 70 -99 SPO 1997 10 27 07 13 104 1.0 -9 674.30 -53.4 -53.4 -49.4 67 -99 SPO 1997 10 27 07 14 105 1.0 -9 674.30 -53.3 -53.4 -49.3 66 -99 SPO 1997 10 27 07 15 100 1.0 -9 674.30 -53.4 -53.5 -49.5 66 -99 SPO 1997 10 27 07 16 94 0.9 -9 674.30 -53.4 -53.5 -49.4 65 -99 SPO 1997 10 27 07 17 86 1.0 -9 674.30 -53.8 -53.5 -48.8 69 -99 SPO 1997 10 27 07 18 85 1.3 -9 674.30 -54.0 -53.5 -47.9 72 -99 SPO 1997 10 27 07 19 89 1.7 -9 674.30 -54.0 -53.5 -47.7 72 -99 SPO 1997 10 27 07 20 88 2.1 -9 674.30 -54.0 -53.4 -48.1 72 -99 SPO 1997 10 27 07 21 83 2.1 -9 674.30 -54.0 -53.3 -48.6 70 -99 SPO 1997 10 27 07 22 82 2.2 -9 674.30 -54.0 -53.3 -48.8 68 -99 SPO 1997 10 27 07 23 84 2.2 -9 674.30 -54.0 -53.2 -49.0 67 -99 SPO 1997 10 27 07 24 86 2.2 -9 674.30 -54.0 -53.2 -49.2 65 -99 SPO 1997 10 27 07 25 87 2.1 -9 674.30 -54.0 -53.2 -49.4 64 -99 SPO 1997 10 27 07 26 87 2.1 -9 674.30 -54.1 -53.3 -49.4 65 -99 SPO 1997 10 27 07 27 86 2.0 -9 674.30 -54.1 -53.3 -49.3 65 -99 SPO 1997 10 27 07 28 85 2.0 -9 674.30 -54.2 -53.2 -49.2 67 -99 SPO 1997 10 27 07 29 87 2.2 -9 674.30 -54.2 -53.2 -49.2 67 -99 SPO 1997 10 27 07 30 88 2.4 -9 674.20 -54.1 -53.2 -49.6 67 -99 SPO 1997 10 27 07 31 87 2.6 -9 674.20 -54.1 -53.1 -49.9 67 -99 SPO 1997 10 27 07 32 86 2.4 -9 674.20 -54.1 -53.0 -50.0 67 -99 SPO 1997 10 27 07 33 86 2.4 -9 674.20 -54.1 -53.0 -50.1 66 -99 SPO 1997 10 27 07 34 87 2.4 -9 674.20 -54.1 -53.0 -50.1 66 -99 SPO 1997 10 27 07 35 88 2.3 -9 674.20 -54.1 -53.0 -50.1 66 -99 SPO 1997 10 27 07 36 90 2.2 -9 674.20 -54.1 -52.9 -50.1 65 -99 SPO 1997 10 27 07 37 87 2.3 -9 674.20 -54.1 -52.9 -50.0 65 -99 SPO 1997 10 27 07 38 86 2.3 -9 674.20 -54.0 -52.9 -50.1 64 -99 SPO 1997 10 27 07 39 86 2.5 -9 674.20 -54.0 -52.9 -50.1 65 -99 SPO 1997 10 27 07 40 87 2.9 -9 674.20 -54.0 -52.9 -50.3 65 -99 SPO 1997 10 27 07 41 88 3.1 -9 674.20 -54.0 -52.8 -50.6 65 -99 SPO 1997 10 27 07 42 90 3.2 -9 674.20 -54.0 -52.8 -50.8 66 -99 SPO 1997 10 27 07 43 90 3.2 -9 674.10 -54.0 -52.8 -51.0 65 -99 SPO 1997 10 27 07 44 92 3.3 -9 674.10 -54.2 -52.8 -51.2 66 -99 SPO 1997 10 27 07 45 92 3.4 -9 674.10 -54.3 -52.8 -51.3 66 -99 SPO 1997 10 27 07 46 91 3.4 -9 674.10 -54.4 -52.8 -51.4 64 -99 SPO 1997 10 27 07 47 89 3.4 -9 674.10 -54.5 -52.8 -51.4 65 -99 SPO 1997 10 27 07 48 87 3.4 -9 674.10 -54.6 -52.8 -51.4 65 -99 SPO 1997 10 27 07 49 86 3.3 -9 674.10 -54.6 -52.8 -51.5 66 -99 SPO 1997 10 27 07 50 85 3.3 -9 674.10 -54.6 -52.8 -51.6 66 -99 SPO 1997 10 27 07 51 84 3.2 -9 674.10 -54.5 -52.8 -51.6 65 -99 SPO 1997 10 27 07 52 83 3.3 -9 674.10 -54.4 -52.8 -51.7 66 -99 SPO 1997 10 27 07 53 83 3.4 -9 674.10 -54.4 -52.7 -51.8 67 -99 SPO 1997 10 27 07 54 80 3.2 -9 674.10 -54.4 -52.7 -51.9 67 -99 SPO 1997 10 27 07 55 78 3.2 -9 674.10 -54.4 -52.7 -52.0 67 -99 SPO 1997 10 27 07 56 78 3.4 -9 674.10 -54.3 -52.7 -52.1 67 -99 SPO 1997 10 27 07 57 77 3.4 -9 674.10 -54.3 -52.6 -52.2 67 -99 SPO 1997 10 27 07 58 76 3.4 -9 674.10 -54.4 -52.6 -52.4 67 -99 SPO 1997 10 27 07 59 77 3.4 -9 674.10 -54.3 -52.6 -52.4 67 -99 SPO 1997 10 27 08 00 78 3.7 -9 674.10 -54.3 -52.5 -52.5 67 0 SPO 1997 10 27 08 01 77 3.9 -9 674.00 -54.2 -52.6 -52.6 66 -99 SPO 1997 10 27 08 02 78 4.2 -9 674.00 -54.2 -52.6 -52.7 66 -99 SPO 1997 10 27 08 03 81 4.3 -9 674.00 -54.2 -52.6 -52.6 65 -99 SPO 1997 10 27 08 04 80 4.5 -9 674.00 -54.0 -52.6 -52.6 63 -99 SPO 1997 10 27 08 05 79 4.5 -9 674.00 -54.0 -52.5 -52.6 63 -99 SPO 1997 10 27 08 06 77 4.7 -9 674.00 -54.0 -52.5 -52.8 65 -99 SPO 1997 10 27 08 07 77 4.9 -9 674.00 -54.0 -52.4 -52.9 65 -99 SPO 1997 10 27 08 08 78 5.1 -9 674.00 -54.0 -52.4 -53.0 65 -99 SPO 1997 10 27 08 09 78 5.1 -9 674.00 -54.1 -52.3 -53.0 66 -99 SPO 1997 10 27 08 10 78 5.0 -9 674.00 -54.2 -52.2 -53.1 67 -99 SPO 1997 10 27 08 11 78 5.0 -9 673.90 -54.2 -52.2 -53.1 66 -99 SPO 1997 10 27 08 12 77 5.0 -9 674.00 -54.2 -52.1 -53.2 66 -99 SPO 1997 10 27 08 13 77 5.3 -9 674.00 -54.2 -52.1 -53.2 65 -99 SPO 1997 10 27 08 14 77 5.4 -9 674.00 -54.2 -52.0 -53.3 65 -99 SPO 1997 10 27 08 15 76 5.4 -9 674.00 -54.1 -52.0 -53.3 64 -99 SPO 1997 10 27 08 16 74 5.3 -9 674.00 -54.1 -52.0 -53.3 64 -99 SPO 1997 10 27 08 17 74 5.1 -9 674.00 -54.1 -52.0 -53.3 63 -99 SPO 1997 10 27 08 18 71 4.5 -9 674.00 -54.1 -52.0 -53.2 62 -99 SPO 1997 10 27 08 19 65 3.7 -9 674.00 -54.3 -52.1 -53.1 63 -99 SPO 1997 10 27 08 20 54 3.0 -9 674.00 -54.4 -52.3 -53.1 64 -99 SPO 1997 10 27 08 21 45 2.6 -9 674.00 -54.2 -52.6 -53.2 63 -99 SPO 1997 10 27 08 22 46 2.8 -9 674.00 -54.2 -52.8 -53.2 64 -99 SPO 1997 10 27 08 23 53 3.0 -9 674.00 -54.2 -52.9 -53.1 65 -99 SPO 1997 10 27 08 24 59 3.3 -9 674.00 -54.2 -52.8 -53.0 67 -99 SPO 1997 10 27 08 25 61 3.5 -9 674.00 -54.1 -52.7 -52.9 67 -99 SPO 1997 10 27 08 26 61 3.3 -9 674.00 -54.1 -52.6 -52.9 67 -99 SPO 1997 10 27 08 27 59 3.2 -9 674.00 -54.1 -52.6 -52.8 67 -99 SPO 1997 10 27 08 28 59 3.1 -9 674.00 -54.2 -52.7 -52.8 68 -99 SPO 1997 10 27 08 29 62 3.0 -9 674.00 -54.2 -52.7 -52.7 68 -99 SPO 1997 10 27 08 30 64 2.8 -9 674.00 -54.2 -52.8 -52.6 68 -99 SPO 1997 10 27 08 31 67 2.9 -9 674.00 -54.1 -52.8 -52.6 66 -99 SPO 1997 10 27 08 32 68 3.0 -9 674.00 -54.1 -52.7 -52.7 66 -99 SPO 1997 10 27 08 33 69 2.9 -9 674.00 -54.1 -52.8 -52.7 65 -99 SPO 1997 10 27 08 34 73 3.0 -9 674.00 -54.0 -52.7 -52.7 64 -99 SPO 1997 10 27 08 35 75 3.1 -9 674.00 -54.0 -52.7 -52.6 65 -99 SPO 1997 10 27 08 36 78 3.0 -9 673.90 -54.1 -52.7 -52.4 66 -99 SPO 1997 10 27 08 37 80 3.2 -9 673.90 -54.1 -52.7 -52.2 67 -99 SPO 1997 10 27 08 38 83 3.4 -9 673.90 -54.1 -52.6 -52.2 66 -99 SPO 1997 10 27 08 39 85 3.5 -9 673.90 -54.1 -52.6 -52.2 66 -99 SPO 1997 10 27 08 40 87 3.3 -9 673.80 -54.1 -52.6 -52.2 65 -99 SPO 1997 10 27 08 41 86 3.1 -9 673.90 -54.2 -52.7 -52.2 65 -99 SPO 1997 10 27 08 42 85 2.5 -9 673.90 -54.2 -52.8 -52.0 65 -99 SPO 1997 10 27 08 43 88 1.9 -9 673.90 -54.2 -53.0 -51.6 65 -99 SPO 1997 10 27 08 44 92 1.4 -9 674.00 -54.2 -53.1 -51.3 66 -99 SPO 1997 10 27 08 45 97 1.4 -9 674.00 -54.0 -53.2 -51.3 66 -99 SPO 1997 10 27 08 46 104 1.3 -9 674.00 -53.6 -53.2 -51.4 64 -99 SPO 1997 10 27 08 47 101 1.3 -9 674.00 -53.6 -53.2 -51.7 64 -99 SPO 1997 10 27 08 48 101 1.5 -9 674.00 -53.6 -53.2 -51.8 64 -99 SPO 1997 10 27 08 49 98 1.5 -9 674.00 -53.7 -53.2 -51.7 65 -99 SPO 1997 10 27 08 50 88 1.4 -9 674.00 -53.8 -53.2 -51.3 67 -99 SPO 1997 10 27 08 51 82 1.5 -9 674.00 -53.8 -53.2 -50.7 67 -99 SPO 1997 10 27 08 52 74 1.4 -9 674.00 -53.9 -53.2 -50.2 69 -99 SPO 1997 10 27 08 53 70 1.7 -9 674.00 -53.8 -53.2 -50.5 69 -99 SPO 1997 10 27 08 54 75 1.8 -9 674.00 -53.9 -53.1 -50.7 70 -99 SPO 1997 10 27 08 55 81 1.9 -9 674.00 -53.8 -53.1 -50.6 69 -99 SPO 1997 10 27 08 56 81 2.0 -9 674.00 -53.8 -53.1 -50.4 69 -99 SPO 1997 10 27 08 57 79 1.8 -9 674.00 -53.8 -53.1 -50.5 69 -99 SPO 1997 10 27 08 58 78 1.8 -9 674.00 -53.9 -53.1 -50.6 70 -99 SPO 1997 10 27 08 59 80 1.9 -9 674.00 -53.8 -53.1 -50.4 68 -99 SPO 1997 10 27 09 00 75 2.1 -9 674.00 -53.8 -53.1 -50.4 68 0 SPO 1997 10 27 09 01 70 2.0 -9 674.00 -53.8 -53.1 -50.9 69 -99 SPO 1997 10 27 09 02 71 2.3 -9 674.00 -53.8 -53.1 -51.2 68 -99 SPO 1997 10 27 09 03 75 2.4 -9 674.00 -53.7 -53.1 -51.3 67 -99 SPO 1997 10 27 09 04 76 2.4 -9 674.00 -53.7 -53.1 -51.3 67 -99 SPO 1997 10 27 09 05 76 2.3 -9 674.00 -53.8 -53.1 -51.2 67 -99 SPO 1997 10 27 09 06 76 2.3 -9 674.00 -53.8 -53.1 -51.4 67 -99 SPO 1997 10 27 09 07 79 2.7 -9 674.00 -53.8 -53.1 -51.5 67 -99 SPO 1997 10 27 09 08 82 2.8 -9 674.00 -53.8 -53.0 -51.5 67 -99 SPO 1997 10 27 09 09 80 2.9 -9 674.00 -53.7 -53.0 -51.5 66 -99 SPO 1997 10 27 09 10 82 2.9 -9 674.00 -53.8 -53.0 -51.5 67 -99 SPO 1997 10 27 09 11 85 2.9 -9 674.00 -53.9 -52.9 -51.5 67 -99 SPO 1997 10 27 09 12 87 2.9 -9 674.00 -53.9 -53.0 -51.5 67 -99 SPO 1997 10 27 09 13 85 2.9 -9 674.00 -53.8 -53.0 -51.6 66 -99 SPO 1997 10 27 09 14 83 3.1 -9 674.00 -53.9 -53.0 -51.6 67 -99 SPO 1997 10 27 09 15 82 3.1 -9 674.00 -53.9 -53.0 -51.7 67 -99 SPO 1997 10 27 09 16 85 3.2 -9 674.00 -54.0 -53.0 -51.8 67 -99 SPO 1997 10 27 09 17 86 3.3 -9 673.90 -54.0 -52.9 -51.9 67 -99 SPO 1997 10 27 09 18 84 3.4 -9 673.90 -54.0 -52.9 -52.0 67 -99 SPO 1997 10 27 09 19 84 3.5 -9 673.90 -54.1 -52.8 -52.2 67 -99 SPO 1997 10 27 09 20 83 3.7 -9 673.80 -54.2 -52.8 -52.4 67 -99 SPO 1997 10 27 09 21 82 3.8 -9 673.80 -54.2 -52.8 -52.6 65 -99 SPO 1997 10 27 09 22 82 3.8 -9 673.80 -54.2 -52.7 -52.8 65 -99 SPO 1997 10 27 09 23 81 3.9 -9 673.80 -54.3 -52.6 -53.0 65 -99 SPO 1997 10 27 09 24 80 3.8 -9 673.80 -54.4 -52.6 -53.1 64 -99 SPO 1997 10 27 09 25 79 3.9 -9 673.80 -54.4 -52.6 -53.1 64 -99 SPO 1997 10 27 09 26 79 3.8 -9 673.80 -54.4 -52.6 -53.2 64 -99 SPO 1997 10 27 09 27 77 3.8 -9 673.80 -54.5 -52.6 -53.2 64 -99 SPO 1997 10 27 09 28 75 3.8 -9 673.80 -54.5 -52.7 -53.3 65 -99 SPO 1997 10 27 09 29 75 3.8 -9 673.80 -54.5 -52.7 -53.3 64 -99 SPO 1997 10 27 09 30 75 3.8 -9 673.80 -54.5 -52.7 -53.4 64 -99 SPO 1997 10 27 09 31 76 3.9 -9 673.80 -54.5 -52.6 -53.4 63 -99 SPO 1997 10 27 09 32 79 3.9 -9 673.70 -54.6 -52.6 -53.4 64 -99 SPO 1997 10 27 09 33 79 4.0 -9 673.70 -54.6 -52.5 -53.3 64 -99 SPO 1997 10 27 09 34 79 3.9 -9 673.70 -54.7 -52.5 -53.3 65 -99 SPO 1997 10 27 09 35 79 3.9 -9 673.80 -54.7 -52.4 -53.3 64 -99 SPO 1997 10 27 09 36 80 3.9 -9 673.80 -54.7 -52.4 -53.3 63 -99 SPO 1997 10 27 09 37 81 3.9 -9 673.70 -54.7 -52.4 -53.3 62 -99 SPO 1997 10 27 09 38 80 3.9 -9 673.70 -54.8 -52.4 -53.2 63 -99 SPO 1997 10 27 09 39 80 3.8 -9 673.70 -54.8 -52.5 -53.2 64 -99 SPO 1997 10 27 09 40 80 3.8 -9 673.70 -54.8 -52.6 -53.2 63 -99 SPO 1997 10 27 09 41 81 3.8 -9 673.70 -54.8 -52.6 -53.1 64 -99 SPO 1997 10 27 09 42 81 3.9 -9 673.70 -54.8 -52.6 -53.1 63 -99 SPO 1997 10 27 09 43 81 3.9 -9 673.70 -54.9 -52.6 -53.2 64 -99 SPO 1997 10 27 09 44 81 3.9 -9 673.70 -54.9 -52.6 -53.2 64 -99 SPO 1997 10 27 09 45 81 3.9 -9 673.70 -54.9 -52.6 -53.3 63 -99 SPO 1997 10 27 09 46 81 3.9 -9 673.70 -54.9 -52.7 -53.3 63 -99 SPO 1997 10 27 09 47 81 3.8 -9 673.70 -54.9 -52.8 -53.3 63 -99 SPO 1997 10 27 09 48 80 3.5 -9 673.70 -54.9 -52.8 -53.2 63 -99 SPO 1997 10 27 09 49 80 3.1 -9 673.70 -54.9 -52.8 -53.2 63 -99 SPO 1997 10 27 09 50 82 2.9 -9 673.70 -54.9 -52.7 -53.0 63 -99 SPO 1997 10 27 09 51 83 2.8 -9 673.70 -54.9 -52.7 -52.8 63 -99 SPO 1997 10 27 09 52 83 2.8 -9 673.70 -55.0 -52.6 -52.7 64 -99 SPO 1997 10 27 09 53 82 2.8 -9 673.70 -54.9 -52.6 -52.7 63 -99 SPO 1997 10 27 09 54 82 2.9 -9 673.70 -55.0 -52.5 -52.7 64 -99 SPO 1997 10 27 09 55 81 3.1 -9 673.70 -55.0 -52.4 -52.8 65 -99 SPO 1997 10 27 09 56 80 3.3 -9 673.70 -55.0 -52.4 -53.0 65 -99 SPO 1997 10 27 09 57 79 3.5 -9 673.70 -55.0 -52.2 -53.2 65 -99 SPO 1997 10 27 09 58 78 3.8 -9 673.70 -55.0 -52.1 -53.4 66 -99 SPO 1997 10 27 09 59 78 4.0 -9 673.70 -55.0 -52.0 -53.6 66 -99 SPO 1997 10 27 10 00 79 4.2 -9 673.60 -55.0 -52.0 -53.7 66 0 SPO 1997 10 27 10 01 79 4.2 -9 673.60 -55.0 -52.0 -53.8 65 -99 SPO 1997 10 27 10 02 79 4.2 -9 673.60 -55.1 -52.0 -53.8 66 -99 SPO 1997 10 27 10 03 81 4.2 -9 673.60 -55.1 -52.1 -53.8 65 -99 SPO 1997 10 27 10 04 81 4.2 -9 673.60 -55.1 -52.1 -53.8 64 -99 SPO 1997 10 27 10 05 81 4.1 -9 673.50 -55.1 -52.2 -53.7 63 -99 SPO 1997 10 27 10 06 80 4.2 -9 673.50 -55.1 -52.2 -53.7 62 -99 SPO 1997 10 27 10 07 80 4.2 -9 673.50 -55.1 -52.2 -53.8 62 -99 SPO 1997 10 27 10 08 81 4.3 -9 673.50 -55.1 -52.2 -53.7 63 -99 SPO 1997 10 27 10 09 82 4.3 -9 673.50 -55.2 -52.2 -53.7 65 -99 SPO 1997 10 27 10 10 84 4.4 -9 673.50 -55.2 -52.2 -53.6 65 -99 SPO 1997 10 27 10 11 84 4.4 -9 673.50 -55.2 -52.2 -53.6 65 -99 SPO 1997 10 27 10 12 85 4.5 -9 673.50 -55.2 -52.1 -53.7 65 -99 SPO 1997 10 27 10 13 85 4.5 -9 673.50 -55.1 -52.1 -53.7 64 -99 SPO 1997 10 27 10 14 84 4.4 -9 673.50 -55.1 -52.1 -53.7 64 -99 SPO 1997 10 27 10 15 84 4.4 -9 673.50 -55.1 -52.0 -53.7 65 -99 SPO 1997 10 27 10 16 83 4.3 -9 673.50 -55.0 -52.1 -53.8 64 -99 SPO 1997 10 27 10 17 82 4.3 -9 673.60 -55.0 -52.1 -53.8 64 -99 SPO 1997 10 27 10 18 83 4.2 -9 673.60 -55.0 -52.1 -53.8 64 -99 SPO 1997 10 27 10 19 83 4.1 -9 673.60 -55.0 -52.1 -53.7 64 -99 SPO 1997 10 27 10 20 84 4.0 -9 673.60 -54.9 -52.1 -53.7 63 -99 SPO 1997 10 27 10 21 84 4.0 -9 673.60 -54.9 -52.1 -53.7 63 -99 SPO 1997 10 27 10 22 85 3.9 -9 673.60 -54.9 -52.1 -53.6 63 -99 SPO 1997 10 27 10 23 86 3.9 -9 673.60 -54.9 -52.1 -53.5 64 -99 SPO 1997 10 27 10 24 86 3.8 -9 673.60 -54.9 -52.2 -53.4 64 -99 SPO 1997 10 27 10 25 87 3.8 -9 673.60 -55.0 -52.3 -53.4 65 -99 SPO 1997 10 27 10 26 85 3.8 -9 673.60 -54.9 -52.4 -53.4 64 -99 SPO 1997 10 27 10 27 83 4.0 -9 673.60 -54.9 -52.4 -53.5 64 -99 SPO 1997 10 27 10 28 81 4.0 -9 673.60 -54.9 -52.5 -53.6 64 -99 SPO 1997 10 27 10 29 80 3.9 -9 673.60 -54.9 -52.5 -53.8 65 -99 SPO 1997 10 27 10 30 79 3.9 -9 673.60 -54.9 -52.5 -53.9 65 -99 SPO 1997 10 27 10 31 77 3.8 -9 673.60 -55.0 -52.4 -53.9 66 -99 SPO 1997 10 27 10 32 78 3.9 -9 673.60 -55.0 -52.4 -54.0 66 -99 SPO 1997 10 27 10 33 77 4.1 -9 673.60 -54.9 -52.4 -54.0 65 -99 SPO 1997 10 27 10 34 75 4.2 -9 673.60 -54.9 -52.3 -54.0 65 -99 SPO 1997 10 27 10 35 73 4.4 -9 673.60 -54.9 -52.2 -54.0 65 -99 SPO 1997 10 27 10 36 72 4.6 -9 673.60 -54.9 -52.2 -54.0 65 -99 SPO 1997 10 27 10 37 72 4.7 -9 673.50 -54.8 -52.1 -54.0 64 -99 SPO 1997 10 27 10 38 73 4.8 -9 673.50 -54.8 -52.0 -54.0 65 -99 SPO 1997 10 27 10 39 73 5.1 -9 673.50 -54.7 -51.9 -54.0 64 -99 SPO 1997 10 27 10 40 73 5.2 -9 673.50 -54.7 -51.8 -54.0 64 -99 SPO 1997 10 27 10 41 73 5.4 -9 673.50 -54.6 -51.8 -54.0 64 -99 SPO 1997 10 27 10 42 72 5.6 -9 673.50 -54.6 -51.8 -54.0 64 -99 SPO 1997 10 27 10 43 72 5.7 -9 673.50 -54.6 -51.8 -54.1 65 -99 SPO 1997 10 27 10 44 72 5.8 -9 673.50 -54.6 -51.7 -54.1 64 -99 SPO 1997 10 27 10 45 72 5.6 -9 673.40 -54.6 -51.6 -54.1 64 -99 SPO 1997 10 27 10 46 72 5.6 -9 673.50 -54.6 -51.6 -54.1 64 -99 SPO 1997 10 27 10 47 72 5.7 -9 673.50 -54.7 -51.6 -54.2 64 -99 SPO 1997 10 27 10 48 71 5.8 -9 673.50 -54.7 -51.6 -54.2 63 -99 SPO 1997 10 27 10 49 72 5.8 -9 673.50 -54.7 -51.7 -54.2 62 -99 SPO 1997 10 27 10 50 72 5.7 -9 673.50 -54.7 -51.7 -54.3 62 -99 SPO 1997 10 27 10 51 72 5.6 -9 673.50 -54.8 -51.7 -54.3 63 -99 SPO 1997 10 27 10 52 73 5.3 -9 673.50 -54.8 -51.7 -54.3 63 -99 SPO 1997 10 27 10 53 73 5.1 -9 673.50 -54.8 -51.7 -54.3 63 -99 SPO 1997 10 27 10 54 75 5.0 -9 673.50 -54.9 -51.7 -54.3 64 -99 SPO 1997 10 27 10 55 76 4.6 -9 673.50 -54.9 -51.8 -54.3 64 -99 SPO 1997 10 27 10 56 75 4.3 -9 673.50 -55.0 -51.9 -54.3 64 -99 SPO 1997 10 27 10 57 75 4.0 -9 673.60 -55.0 -52.0 -54.3 64 -99 SPO 1997 10 27 10 58 77 3.6 -9 673.60 -55.0 -52.1 -54.2 64 -99 SPO 1997 10 27 10 59 75 3.1 -9 673.60 -55.1 -52.2 -54.1 65 -99 SPO 1997 10 27 11 00 74 2.7 -9 673.70 -55.1 -52.4 -54.0 65 0 SPO 1997 10 27 11 01 73 2.6 -9 673.70 -55.1 -52.5 -53.8 65 -99 SPO 1997 10 27 11 02 73 2.4 -9 673.70 -55.2 -52.6 -53.8 65 -99 SPO 1997 10 27 11 03 75 2.5 -9 673.70 -55.1 -52.6 -53.8 64 -99 SPO 1997 10 27 11 04 75 2.4 -9 673.70 -55.1 -52.6 -53.8 64 -99 SPO 1997 10 27 11 05 75 2.4 -9 673.70 -55.1 -52.7 -53.7 65 -99 SPO 1997 10 27 11 06 80 2.4 -9 673.70 -55.1 -52.7 -53.6 65 -99 SPO 1997 10 27 11 07 79 2.7 -9 673.70 -55.1 -52.7 -53.5 65 -99 SPO 1997 10 27 11 08 81 2.3 -9 673.70 -55.1 -52.7 -53.3 65 -99 SPO 1997 10 27 11 09 81 2.5 -9 673.70 -55.2 -52.8 -53.1 66 -99 SPO 1997 10 27 11 10 84 2.4 -9 673.70 -55.2 -52.8 -52.9 65 -99 SPO 1997 10 27 11 11 89 2.0 -9 673.80 -55.1 -53.0 -52.8 64 -99 SPO 1997 10 27 11 12 90 1.7 -9 673.80 -55.2 -53.1 -52.6 66 -99 SPO 1997 10 27 11 13 92 1.5 -9 673.80 -55.2 -53.1 -52.8 66 -99 SPO 1997 10 27 11 14 104 1.1 -9 673.80 -55.0 -53.1 -53.1 64 -99 SPO 1997 10 27 11 15 119 1.0 -9 673.80 -54.6 -53.2 -53.0 62 -99 SPO 1997 10 27 11 16 128 1.0 -9 673.90 -54.7 -53.3 -53.0 63 -99 SPO 1997 10 27 11 17 131 1.1 -9 673.90 -54.7 -53.3 -53.2 63 -99 SPO 1997 10 27 11 18 133 1.2 -9 673.90 -54.6 -53.2 -53.2 63 -99 SPO 1997 10 27 11 19 130 1.3 -9 673.90 -54.5 -53.1 -53.2 62 -99 SPO 1997 10 27 11 20 130 1.1 -9 673.90 -54.3 -53.1 -53.0 60 -99 SPO 1997 10 27 11 21 123 1.0 -9 673.90 -54.4 -53.0 -53.0 62 -99 SPO 1997 10 27 11 22 118 1.3 -9 673.90 -54.3 -52.9 -52.9 62 -99 SPO 1997 10 27 11 23 118 1.5 -9 673.90 -54.6 -52.9 -53.1 64 -99 SPO 1997 10 27 11 24 120 1.6 -9 673.90 -54.7 -52.8 -53.2 65 -99 SPO 1997 10 27 11 25 127 1.7 -9 673.90 -54.5 -52.8 -53.0 63 -99 SPO 1997 10 27 11 26 132 1.5 -9 673.90 -54.5 -52.7 -53.1 63 -99 SPO 1997 10 27 11 27 144 1.4 -9 673.90 -54.7 -52.8 -53.3 65 -99 SPO 1997 10 27 11 28 154 1.3 -9 674.00 -54.8 -52.9 -53.4 65 -99 SPO 1997 10 27 11 29 162 1.6 -9 674.00 -54.9 -53.0 -53.5 65 -99 SPO 1997 10 27 11 30 167 1.8 -9 674.00 -54.9 -53.0 -53.4 65 -99 SPO 1997 10 27 11 31 159 1.7 -9 674.00 -54.9 -53.0 -53.4 64 -99 SPO 1997 10 27 11 32 149 1.5 -9 674.00 -55.1 -52.9 -53.4 65 -99 SPO 1997 10 27 11 33 138 1.4 -9 674.00 -55.0 -53.0 -53.5 63 -99 SPO 1997 10 27 11 34 135 1.5 -9 674.00 -54.8 -52.8 -53.3 62 -99 SPO 1997 10 27 11 35 139 1.5 -9 674.00 -54.8 -52.8 -53.2 61 -99 SPO 1997 10 27 11 36 147 1.6 -9 674.00 -54.8 -53.0 -53.3 61 -99 SPO 1997 10 27 11 37 141 1.7 -9 674.00 -54.8 -53.0 -53.4 61 -99 SPO 1997 10 27 11 38 140 1.6 -9 674.00 -54.7 -53.1 -53.3 60 -99 SPO 1997 10 27 11 39 135 2.0 -9 674.00 -54.5 -53.0 -53.2 60 -99 SPO 1997 10 27 11 40 130 2.3 -9 674.00 -54.2 -52.9 -53.0 60 -99 SPO 1997 10 27 11 41 123 2.4 -9 673.90 -54.1 -52.8 -53.1 61 -99 SPO 1997 10 27 11 42 128 2.6 -9 673.90 -54.5 -52.8 -53.5 66 -99 SPO 1997 10 27 11 43 128 2.8 -9 673.90 -54.7 -52.6 -53.7 68 -99 SPO 1997 10 27 11 44 127 2.8 -9 673.90 -54.6 -52.6 -53.7 67 -99 SPO 1997 10 27 11 45 128 2.9 -9 673.80 -54.5 -52.6 -53.7 66 -99 SPO 1997 10 27 11 46 123 3.0 -9 673.90 -54.6 -52.6 -53.8 67 -99 SPO 1997 10 27 11 47 118 3.1 -9 673.80 -54.9 -52.5 -54.0 68 -99 SPO 1997 10 27 11 48 113 3.4 -9 673.80 -55.1 -52.5 -54.1 70 -99 SPO 1997 10 27 11 49 110 3.6 -9 673.80 -55.2 -52.4 -54.1 69 -99 SPO 1997 10 27 11 50 107 3.7 -9 673.70 -55.2 -52.4 -54.0 67 -99 SPO 1997 10 27 11 51 103 3.9 -9 673.70 -55.2 -52.4 -53.8 66 -99 SPO 1997 10 27 11 52 101 4.0 -9 673.70 -55.2 -52.4 -53.7 66 -99 SPO 1997 10 27 11 53 100 4.1 -9 673.70 -55.2 -52.3 -53.6 64 -99 SPO 1997 10 27 11 54 99 4.3 -9 673.70 -55.2 -52.3 -53.6 63 -99 SPO 1997 10 27 11 55 98 4.3 -9 673.70 -55.2 -52.3 -53.7 63 -99 SPO 1997 10 27 11 56 98 4.3 -9 673.70 -55.2 -52.4 -53.7 64 -99 SPO 1997 10 27 11 57 96 4.2 -9 673.70 -55.3 -52.4 -53.7 65 -99 SPO 1997 10 27 11 58 97 4.1 -9 673.70 -55.2 -52.4 -53.7 64 -99 SPO 1997 10 27 11 59 95 4.0 -9 673.70 -55.2 -52.4 -53.7 64 -99 SPO 1997 10 27 12 00 95 4.0 -9 673.70 -55.3 -52.4 -53.7 65 0 SPO 1997 10 27 12 01 95 4.1 -9 673.60 -55.2 -52.4 -53.7 63 -99 SPO 1997 10 27 12 02 96 4.0 -9 673.70 -55.3 -52.4 -53.7 64 -99 SPO 1997 10 27 12 03 99 3.8 -9 673.60 -55.3 -52.4 -53.7 65 -99 SPO 1997 10 27 12 04 101 3.5 -9 673.70 -55.4 -52.4 -53.7 65 -99 SPO 1997 10 27 12 05 102 3.6 -9 673.70 -55.4 -52.6 -53.7 65 -99 SPO 1997 10 27 12 06 101 4.0 -9 673.60 -55.4 -52.6 -53.8 65 -99 SPO 1997 10 27 12 07 99 4.2 -9 673.60 -55.4 -52.6 -53.8 64 -99 SPO 1997 10 27 12 08 97 4.2 -9 673.60 -55.4 -52.7 -53.8 64 -99 SPO 1997 10 27 12 09 96 4.3 -9 673.60 -55.4 -52.7 -53.8 64 -99 SPO 1997 10 27 12 10 95 4.3 -9 673.60 -55.3 -52.6 -53.9 63 -99 SPO 1997 10 27 12 11 93 4.4 -9 673.60 -55.3 -52.5 -53.9 64 -99 SPO 1997 10 27 12 12 91 4.6 -9 673.60 -55.3 -52.5 -53.9 65 -99 SPO 1997 10 27 12 13 90 4.4 -9 673.60 -55.3 -52.4 -53.9 65 -99 SPO 1997 10 27 12 14 91 4.4 -9 673.60 -55.3 -52.4 -53.9 66 -99 SPO 1997 10 27 12 15 89 3.8 -9 673.60 -55.3 -52.5 -53.9 66 -99 SPO 1997 10 27 12 16 90 3.9 -9 673.60 -55.3 -52.5 -53.8 66 -99 SPO 1997 10 27 12 17 89 3.7 -9 673.60 -55.4 -52.5 -53.8 66 -99 SPO 1997 10 27 12 18 89 3.6 -9 673.60 -55.4 -52.5 -53.7 66 -99 SPO 1997 10 27 12 19 88 3.6 -9 673.60 -55.4 -52.5 -53.7 66 -99 SPO 1997 10 27 12 20 88 3.7 -9 673.60 -55.5 -52.4 -53.6 66 -99 SPO 1997 10 27 12 21 87 3.6 -9 673.60 -55.5 -52.4 -53.6 65 -99 SPO 1997 10 27 12 22 86 3.7 -9 673.70 -55.5 -52.4 -53.6 65 -99 SPO 1997 10 27 12 23 86 3.8 -9 673.70 -55.5 -52.4 -53.6 65 -99 SPO 1997 10 27 12 24 84 3.8 -9 673.60 -55.5 -52.4 -53.7 65 -99 SPO 1997 10 27 12 25 84 3.9 -9 673.60 -55.5 -52.4 -53.7 65 -99 SPO 1997 10 27 12 26 83 4.0 -9 673.60 -55.5 -52.4 -53.8 66 -99 SPO 1997 10 27 12 27 82 4.1 -9 673.60 -55.5 -52.5 -53.8 66 -99 SPO 1997 10 27 12 28 79 4.3 -9 673.60 -55.5 -52.5 -54.0 66 -99 SPO 1997 10 27 12 29 78 4.3 -9 673.60 -55.5 -52.5 -54.2 67 -99 SPO 1997 10 27 12 30 79 4.5 -9 673.60 -55.4 -52.5 -54.3 66 -99 SPO 1997 10 27 12 31 79 4.4 -9 673.50 -55.4 -52.5 -54.3 67 -99 SPO 1997 10 27 12 32 78 4.2 -9 673.50 -55.4 -52.5 -54.3 67 -99 SPO 1997 10 27 12 33 78 4.1 -9 673.50 -55.4 -52.5 -54.3 67 -99 SPO 1997 10 27 12 34 78 4.0 -9 673.50 -55.4 -52.6 -54.3 67 -99 SPO 1997 10 27 12 35 78 4.1 -9 673.50 -55.4 -52.6 -54.3 67 -99 SPO 1997 10 27 12 36 78 4.1 -9 673.50 -55.4 -52.6 -54.4 67 -99 SPO 1997 10 27 12 37 79 3.9 -9 673.50 -55.5 -52.5 -54.3 67 -99 SPO 1997 10 27 12 38 80 3.9 -9 673.50 -55.5 -52.5 -54.2 66 -99 SPO 1997 10 27 12 39 80 3.9 -9 673.50 -55.4 -52.5 -54.2 65 -99 SPO 1997 10 27 12 40 80 4.0 -9 673.50 -55.4 -52.5 -54.2 65 -99 SPO 1997 10 27 12 41 79 4.2 -9 673.40 -55.4 -52.5 -54.2 65 -99 SPO 1997 10 27 12 42 79 4.5 -9 673.40 -55.4 -52.4 -54.3 65 -99 SPO 1997 10 27 12 43 78 4.6 -9 673.40 -55.4 -52.4 -54.4 66 -99 SPO 1997 10 27 12 44 77 4.7 -9 673.40 -55.4 -52.4 -54.5 66 -99 SPO 1997 10 27 12 45 77 4.8 -9 673.40 -55.4 -52.4 -54.6 65 -99 SPO 1997 10 27 12 46 76 4.9 -9 673.40 -55.4 -52.4 -54.6 65 -99 SPO 1997 10 27 12 47 75 4.8 -9 673.40 -55.4 -52.4 -54.6 65 -99 SPO 1997 10 27 12 48 74 4.8 -9 673.40 -55.4 -52.4 -54.6 65 -99 SPO 1997 10 27 12 49 74 4.8 -9 673.40 -55.3 -52.3 -54.5 64 -99 SPO 1997 10 27 12 50 73 4.7 -9 673.40 -55.2 -52.3 -54.5 63 -99 SPO 1997 10 27 12 51 74 4.6 -9 673.40 -55.2 -52.4 -54.4 63 -99 SPO 1997 10 27 12 52 74 4.5 -9 673.40 -55.2 -52.4 -54.4 64 -99 SPO 1997 10 27 12 53 74 4.4 -9 673.40 -55.2 -52.4 -54.3 64 -99 SPO 1997 10 27 12 54 74 4.2 -9 673.40 -55.2 -52.5 -54.3 64 -99 SPO 1997 10 27 12 55 75 4.1 -9 673.40 -55.2 -52.5 -54.2 65 -99 SPO 1997 10 27 12 56 74 4.0 -9 673.40 -55.1 -52.5 -54.1 65 -99 SPO 1997 10 27 12 57 74 3.9 -9 673.40 -55.1 -52.5 -54.1 65 -99 SPO 1997 10 27 12 58 74 4.0 -9 673.40 -55.1 -52.5 -54.1 66 -99 SPO 1997 10 27 12 59 75 4.1 -9 673.40 -55.2 -52.5 -54.1 67 -99 SPO 1997 10 27 13 00 74 4.3 -9 673.40 -55.1 -52.5 -54.2 66 0 SPO 1997 10 27 13 01 74 4.5 -9 673.30 -55.1 -52.5 -54.2 66 -99 SPO 1997 10 27 13 02 74 4.7 -9 673.30 -55.1 -52.4 -54.3 67 -99 SPO 1997 10 27 13 03 74 4.8 -9 673.30 -55.1 -52.4 -54.3 66 -99 SPO 1997 10 27 13 04 74 4.9 -9 673.30 -55.2 -52.4 -54.4 67 -99 SPO 1997 10 27 13 05 73 5.0 -9 673.30 -55.1 -52.4 -54.4 66 -99 SPO 1997 10 27 13 06 72 5.2 -9 673.30 -55.1 -52.4 -54.4 66 -99 SPO 1997 10 27 13 07 73 5.2 -9 673.30 -55.1 -52.3 -54.5 65 -99 SPO 1997 10 27 13 08 73 5.3 -9 673.30 -55.1 -52.3 -54.5 65 -99 SPO 1997 10 27 13 09 73 5.3 -9 673.30 -55.0 -52.3 -54.5 63 -99 SPO 1997 10 27 13 10 72 5.2 -9 673.30 -55.0 -52.3 -54.5 63 -99 SPO 1997 10 27 13 11 72 5.2 -9 673.30 -55.0 -52.3 -54.5 64 -99 SPO 1997 10 27 13 12 72 5.4 -9 673.30 -55.0 -52.3 -54.5 64 -99 SPO 1997 10 27 13 13 71 5.4 -9 673.30 -55.0 -52.3 -54.5 63 -99 SPO 1997 10 27 13 14 72 5.5 -9 673.30 -55.0 -52.3 -54.5 63 -99 SPO 1997 10 27 13 15 73 5.5 -9 673.30 -55.0 -52.3 -54.5 64 -99 SPO 1997 10 27 13 16 73 5.4 -9 673.30 -55.0 -52.3 -54.5 64 -99 SPO 1997 10 27 13 17 72 5.4 -9 673.30 -55.0 -52.2 -54.6 65 -99 SPO 1997 10 27 13 18 72 5.3 -9 673.30 -55.0 -52.2 -54.6 65 -99 SPO 1997 10 27 13 19 72 5.3 -9 673.30 -55.1 -52.2 -54.6 66 -99 SPO 1997 10 27 13 20 72 5.4 -9 673.30 -55.1 -52.2 -54.6 65 -99 SPO 1997 10 27 13 21 72 5.4 -9 673.30 -55.1 -52.2 -54.6 65 -99 SPO 1997 10 27 13 22 71 5.4 -9 673.30 -55.1 -52.2 -54.6 64 -99 SPO 1997 10 27 13 23 71 5.4 -9 673.30 -55.1 -52.2 -54.6 63 -99 SPO 1997 10 27 13 24 71 5.6 -9 673.30 -55.1 -52.1 -54.6 62 -99 SPO 1997 10 27 13 25 72 5.6 -9 673.30 -55.1 -52.1 -54.6 63 -99 SPO 1997 10 27 13 26 72 5.7 -9 673.30 -55.1 -52.1 -54.6 63 -99 SPO 1997 10 27 13 27 72 5.6 -9 673.30 -55.1 -52.1 -54.6 64 -99 SPO 1997 10 27 13 28 72 5.5 -9 673.30 -55.1 -52.1 -54.6 64 -99 SPO 1997 10 27 13 29 73 5.5 -9 673.30 -55.0 -52.1 -54.6 63 -99 SPO 1997 10 27 13 30 73 5.4 -9 673.30 -55.1 -52.1 -54.6 64 -99 SPO 1997 10 27 13 31 72 5.3 -9 673.30 -55.1 -52.2 -54.6 64 -99 SPO 1997 10 27 13 32 72 5.1 -9 673.30 -55.1 -52.2 -54.6 64 -99 SPO 1997 10 27 13 33 72 5.1 -9 673.30 -55.1 -52.3 -54.6 64 -99 SPO 1997 10 27 13 34 71 5.0 -9 673.30 -55.1 -52.4 -54.6 63 -99 SPO 1997 10 27 13 35 71 5.0 -9 673.30 -55.1 -52.5 -54.6 62 -99 SPO 1997 10 27 13 36 71 5.0 -9 673.30 -55.1 -52.6 -54.6 61 -99 SPO 1997 10 27 13 37 71 4.9 -9 673.30 -55.1 -52.6 -54.6 61 -99 SPO 1997 10 27 13 38 71 4.8 -9 673.30 -55.2 -52.7 -54.6 62 -99 SPO 1997 10 27 13 39 70 4.8 -9 673.30 -55.2 -52.7 -54.6 63 -99 SPO 1997 10 27 13 40 70 4.7 -9 673.30 -55.2 -52.8 -54.6 64 -99 SPO 1997 10 27 13 41 71 4.8 -9 673.30 -55.2 -52.8 -54.6 64 -99 SPO 1997 10 27 13 42 71 4.8 -9 673.30 -55.2 -52.8 -54.6 65 -99 SPO 1997 10 27 13 43 72 5.0 -9 673.20 -55.2 -52.7 -54.6 65 -99 SPO 1997 10 27 13 44 72 5.2 -9 673.20 -55.2 -52.6 -54.6 65 -99 SPO 1997 10 27 13 45 72 5.3 -9 673.20 -55.2 -52.7 -54.6 64 -99 SPO 1997 10 27 13 46 71 5.4 -9 673.20 -55.2 -52.7 -54.7 65 -99 SPO 1997 10 27 13 47 71 5.5 -9 673.20 -55.2 -52.6 -54.7 65 -99 SPO 1997 10 27 13 48 71 5.4 -9 673.20 -55.1 -52.5 -54.6 63 -99 SPO 1997 10 27 13 49 71 5.3 -9 673.20 -55.1 -52.5 -54.6 63 -99 SPO 1997 10 27 13 50 70 5.1 -9 673.20 -55.1 -52.5 -54.6 63 -99 SPO 1997 10 27 13 51 69 5.0 -9 673.20 -55.1 -52.6 -54.6 63 -99 SPO 1997 10 27 13 52 69 4.9 -9 673.20 -55.1 -52.6 -54.5 62 -99 SPO 1997 10 27 13 53 70 4.7 -9 673.20 -55.0 -52.6 -54.5 62 -99 SPO 1997 10 27 13 54 69 4.7 -9 673.20 -55.0 -52.7 -54.5 62 -99 SPO 1997 10 27 13 55 68 4.6 -9 673.20 -55.0 -52.8 -54.4 62 -99 SPO 1997 10 27 13 56 67 4.7 -9 673.20 -55.0 -52.9 -54.4 62 -99 SPO 1997 10 27 13 57 68 4.7 -9 673.20 -54.9 -52.9 -54.4 62 -99 SPO 1997 10 27 13 58 68 4.7 -9 673.20 -55.0 -52.9 -54.4 62 -99 SPO 1997 10 27 13 59 68 4.8 -9 673.20 -55.0 -52.9 -54.3 63 -99 SPO 1997 10 27 14 00 69 4.9 -9 673.20 -55.0 -52.9 -54.4 64 0 SPO 1997 10 27 14 01 70 5.0 -9 673.10 -55.0 -52.9 -54.4 64 -99 SPO 1997 10 27 14 02 70 5.1 -9 673.10 -55.0 -52.9 -54.4 64 -99 SPO 1997 10 27 14 03 70 4.9 -9 673.10 -54.9 -52.9 -54.4 63 -99 SPO 1997 10 27 14 04 69 4.9 -9 673.10 -55.0 -53.1 -54.4 63 -99 SPO 1997 10 27 14 05 70 5.1 -9 673.10 -55.0 -53.2 -54.4 62 -99 SPO 1997 10 27 14 06 71 5.2 -9 673.10 -55.0 -53.2 -54.4 62 -99 SPO 1997 10 27 14 07 72 5.2 -9 673.00 -55.0 -53.0 -54.5 62 -99 SPO 1997 10 27 14 08 73 5.4 -9 673.00 -55.0 -52.8 -54.5 62 -99 SPO 1997 10 27 14 09 73 5.3 -9 673.00 -55.0 -52.6 -54.5 62 -99 SPO 1997 10 27 14 10 72 5.3 -9 673.00 -55.0 -52.4 -54.5 63 -99 SPO 1997 10 27 14 11 73 5.2 -9 673.00 -54.9 -52.4 -54.5 62 -99 SPO 1997 10 27 14 12 74 5.1 -9 673.00 -54.9 -52.4 -54.5 62 -99 SPO 1997 10 27 14 13 73 5.1 -9 673.00 -54.9 -52.6 -54.5 62 -99 SPO 1997 10 27 14 14 73 5.2 -9 673.00 -54.9 -52.6 -54.5 62 -99 SPO 1997 10 27 14 15 73 5.0 -9 673.00 -55.0 -52.6 -54.5 62 -99 SPO 1997 10 27 14 16 74 4.7 -9 673.00 -55.0 -52.7 -54.5 62 -99 SPO 1997 10 27 14 17 73 4.5 -9 673.10 -55.0 -52.8 -54.4 61 -99 SPO 1997 10 27 14 18 73 4.5 -9 673.10 -55.0 -52.9 -54.5 60 -99 SPO 1997 10 27 14 19 72 4.4 -9 673.10 -55.0 -53.0 -54.5 59 -99 SPO 1997 10 27 14 20 72 4.4 -9 673.10 -55.1 -53.0 -54.4 60 -99 SPO 1997 10 27 14 21 71 4.5 -9 673.10 -55.0 -53.0 -54.5 60 -99 SPO 1997 10 27 14 22 70 4.7 -9 673.10 -55.0 -53.0 -54.5 61 -99 SPO 1997 10 27 14 23 70 4.7 -9 673.10 -55.0 -53.0 -54.5 62 -99 SPO 1997 10 27 14 24 70 4.8 -9 673.10 -55.0 -53.0 -54.5 61 -99 SPO 1997 10 27 14 25 70 4.8 -9 673.10 -55.0 -53.1 -54.5 62 -99 SPO 1997 10 27 14 26 72 4.7 -9 673.10 -55.0 -53.1 -54.4 62 -99 SPO 1997 10 27 14 27 72 4.7 -9 673.10 -54.9 -53.1 -54.4 62 -99 SPO 1997 10 27 14 28 73 4.7 -9 673.10 -54.9 -53.2 -54.4 61 -99 SPO 1997 10 27 14 29 73 4.6 -9 673.10 -54.9 -53.2 -54.4 61 -99 SPO 1997 10 27 14 30 73 4.5 -9 673.10 -54.9 -53.4 -54.4 62 -99 SPO 1997 10 27 14 31 73 4.5 -9 673.10 -55.0 -53.4 -54.4 61 -99 SPO 1997 10 27 14 32 72 4.3 -9 673.10 -54.9 -53.4 -54.4 60 -99 SPO 1997 10 27 14 33 72 4.5 -9 673.10 -55.0 -53.4 -54.4 61 -99 SPO 1997 10 27 14 34 72 4.7 -9 673.10 -55.0 -53.4 -54.4 60 -99 SPO 1997 10 27 14 35 71 4.6 -9 673.10 -55.0 -53.4 -54.4 61 -99 SPO 1997 10 27 14 36 71 4.6 -9 673.10 -55.0 -53.4 -54.4 61 -99 SPO 1997 10 27 14 37 71 4.6 -9 673.10 -55.0 -53.4 -54.4 61 -99 SPO 1997 10 27 14 38 71 4.8 -9 673.00 -55.0 -53.4 -54.5 61 -99 SPO 1997 10 27 14 39 70 4.9 -9 673.00 -55.0 -53.3 -54.5 61 -99 SPO 1997 10 27 14 40 70 4.9 -9 673.10 -55.1 -53.3 -54.6 62 -99 SPO 1997 10 27 14 41 70 4.8 -9 673.10 -55.2 -53.2 -54.6 62 -99 SPO 1997 10 27 14 42 70 4.7 -9 673.10 -55.2 -53.1 -54.6 62 -99 SPO 1997 10 27 14 43 70 4.6 -9 673.10 -55.2 -53.1 -54.6 62 -99 SPO 1997 10 27 14 44 72 4.5 -9 673.10 -55.2 -53.1 -54.6 62 -99 SPO 1997 10 27 14 45 72 4.3 -9 673.00 -55.2 -53.1 -54.6 61 -99 SPO 1997 10 27 14 46 72 4.1 -9 673.00 -55.3 -53.1 -54.6 61 -99 SPO 1997 10 27 14 47 72 4.0 -9 673.10 -55.3 -53.1 -54.6 61 -99 SPO 1997 10 27 14 48 72 4.1 -9 673.10 -55.3 -53.1 -54.6 60 -99 SPO 1997 10 27 14 49 72 3.9 -9 673.00 -55.3 -53.1 -54.6 61 -99 SPO 1997 10 27 14 50 71 3.7 -9 673.10 -55.3 -53.2 -54.6 62 -99 SPO 1997 10 27 14 51 71 3.8 -9 673.10 -55.3 -53.2 -54.6 62 -99 SPO 1997 10 27 14 52 72 3.6 -9 673.00 -55.4 -53.2 -54.6 62 -99 SPO 1997 10 27 14 53 72 3.8 -9 673.10 -55.4 -53.3 -54.6 62 -99 SPO 1997 10 27 14 54 72 3.9 -9 673.10 -55.4 -53.3 -54.6 62 -99 SPO 1997 10 27 14 55 72 3.9 -9 673.10 -55.4 -53.3 -54.7 62 -99 SPO 1997 10 27 14 56 74 4.0 -9 673.10 -55.4 -53.3 -54.7 62 -99 SPO 1997 10 27 14 57 73 3.9 -9 673.10 -55.4 -53.2 -54.7 62 -99 SPO 1997 10 27 14 58 74 3.8 -9 673.10 -55.5 -53.2 -54.6 62 -99 SPO 1997 10 27 14 59 76 3.8 -9 673.10 -55.4 -53.2 -54.6 61 -99 SPO 1997 10 27 15 00 76 3.7 -9 673.10 -55.5 -53.2 -54.6 61 0 SPO 1997 10 27 15 01 78 3.7 -9 673.10 -55.5 -53.2 -54.6 61 -99 SPO 1997 10 27 15 02 78 3.6 -9 673.10 -55.5 -53.3 -54.5 61 -99 SPO 1997 10 27 15 03 78 3.6 -9 673.10 -55.5 -53.2 -54.5 61 -99 SPO 1997 10 27 15 04 78 3.8 -9 673.10 -55.5 -53.1 -54.5 62 -99 SPO 1997 10 27 15 05 79 3.9 -9 673.10 -55.6 -53.1 -54.6 62 -99 SPO 1997 10 27 15 06 77 4.1 -9 673.10 -55.6 -53.1 -54.6 62 -99 SPO 1997 10 27 15 07 76 4.1 -9 673.10 -55.6 -53.1 -54.7 62 -99 SPO 1997 10 27 15 08 75 4.1 -9 673.10 -55.5 -53.0 -54.7 62 -99 SPO 1997 10 27 15 09 74 4.1 -9 673.10 -55.5 -53.0 -54.8 62 -99 SPO 1997 10 27 15 10 74 4.1 -9 673.10 -55.5 -53.0 -54.8 62 -99 SPO 1997 10 27 15 11 74 4.2 -9 673.10 -55.6 -52.9 -54.8 62 -99 SPO 1997 10 27 15 12 73 4.2 -9 673.10 -55.6 -52.9 -54.8 62 -99 SPO 1997 10 27 15 13 73 4.2 -9 673.10 -55.6 -52.9 -54.8 62 -99 SPO 1997 10 27 15 14 76 4.2 -9 673.10 -55.6 -52.9 -54.8 62 -99 SPO 1997 10 27 15 15 78 4.2 -9 673.10 -55.6 -52.9 -54.8 61 -99 SPO 1997 10 27 15 16 79 4.2 -9 673.10 -55.6 -52.9 -54.7 61 -99 SPO 1997 10 27 15 17 81 4.3 -9 673.10 -55.6 -52.9 -54.7 62 -99 SPO 1997 10 27 15 18 82 4.4 -9 673.10 -55.6 -52.9 -54.6 62 -99 SPO 1997 10 27 15 19 83 4.5 -9 673.10 -55.6 -52.9 -54.6 62 -99 SPO 1997 10 27 15 20 82 4.6 -9 673.10 -55.7 -53.0 -54.6 62 -99 SPO 1997 10 27 15 21 83 4.7 -9 673.10 -55.7 -53.0 -54.6 62 -99 SPO 1997 10 27 15 22 83 4.7 -9 673.00 -55.6 -53.0 -54.6 62 -99 SPO 1997 10 27 15 23 84 4.6 -9 673.00 -55.6 -53.0 -54.6 62 -99 SPO 1997 10 27 15 24 83 4.6 -9 673.00 -55.6 -53.0 -54.6 62 -99 SPO 1997 10 27 15 25 84 4.5 -9 673.00 -55.6 -52.9 -54.6 62 -99 SPO 1997 10 27 15 26 84 4.4 -9 673.00 -55.6 -52.9 -54.6 62 -99 SPO 1997 10 27 15 27 85 4.5 -9 673.00 -55.6 -53.0 -54.6 62 -99 SPO 1997 10 27 15 28 87 4.5 -9 673.00 -55.6 -53.1 -54.5 62 -99 SPO 1997 10 27 15 29 87 4.2 -9 673.00 -55.6 -53.2 -54.4 61 -99 SPO 1997 10 27 15 30 87 4.0 -9 673.10 -55.6 -53.2 -54.4 61 -99 SPO 1997 10 27 15 31 88 3.9 -9 673.10 -55.6 -53.2 -54.3 62 -99 SPO 1997 10 27 15 32 89 3.8 -9 673.10 -55.5 -53.2 -54.2 61 -99 SPO 1997 10 27 15 33 88 3.8 -9 673.10 -55.5 -53.3 -54.2 61 -99 SPO 1997 10 27 15 34 87 3.8 -9 673.10 -55.5 -53.4 -54.2 61 -99 SPO 1997 10 27 15 35 85 3.8 -9 673.10 -55.5 -53.4 -54.1 61 -99 SPO 1997 10 27 15 36 84 4.0 -9 673.10 -55.5 -53.4 -54.2 62 -99 SPO 1997 10 27 15 37 83 4.1 -9 673.00 -55.4 -53.4 -54.3 62 -99 SPO 1997 10 27 15 38 83 4.2 -9 673.00 -55.5 -53.4 -54.4 62 -99 SPO 1997 10 27 15 39 82 4.4 -9 673.00 -55.5 -53.3 -54.4 63 -99 SPO 1997 10 27 15 40 82 4.5 -9 673.00 -55.4 -53.2 -54.4 62 -99 SPO 1997 10 27 15 41 82 4.4 -9 673.00 -55.5 -53.2 -54.4 62 -99 SPO 1997 10 27 15 42 82 4.4 -9 673.00 -55.5 -53.2 -54.5 62 -99 SPO 1997 10 27 15 43 82 4.2 -9 673.00 -55.5 -53.2 -54.4 62 -99 SPO 1997 10 27 15 44 82 4.1 -9 673.00 -55.4 -53.2 -54.4 61 -99 SPO 1997 10 27 15 45 82 4.0 -9 673.00 -55.4 -53.2 -54.3 62 -99 SPO 1997 10 27 15 46 82 4.0 -9 673.00 -55.4 -53.2 -54.3 62 -99 SPO 1997 10 27 15 47 83 4.0 -9 673.00 -55.4 -53.2 -54.3 62 -99 SPO 1997 10 27 15 48 83 4.1 -9 673.00 -55.4 -53.3 -54.3 62 -99 SPO 1997 10 27 15 49 84 4.2 -9 673.00 -55.4 -53.3 -54.3 62 -99 SPO 1997 10 27 15 50 85 4.3 -9 673.00 -55.4 -53.3 -54.3 62 -99 SPO 1997 10 27 15 51 84 4.3 -9 673.00 -55.4 -53.3 -54.3 62 -99 SPO 1997 10 27 15 52 83 4.5 -9 673.00 -55.5 -53.4 -54.4 63 -99 SPO 1997 10 27 15 53 83 4.7 -9 673.00 -55.4 -53.4 -54.4 62 -99 SPO 1997 10 27 15 54 82 4.8 -9 672.90 -55.4 -53.4 -54.5 62 -99 SPO 1997 10 27 15 55 82 4.9 -9 672.90 -55.4 -53.3 -54.5 62 -99 SPO 1997 10 27 15 56 81 5.0 -9 672.90 -55.4 -53.3 -54.5 62 -99 SPO 1997 10 27 15 57 81 5.1 -9 672.90 -55.4 -53.3 -54.5 62 -99 SPO 1997 10 27 15 58 81 5.0 -9 672.90 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 15 59 81 5.0 -9 672.90 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 16 00 80 5.0 -9 672.90 -55.4 -53.2 -54.5 63 0 SPO 1997 10 27 16 01 80 5.1 -9 672.90 -55.4 -53.1 -54.5 63 -99 SPO 1997 10 27 16 02 80 5.1 -9 673.00 -55.4 -53.1 -54.5 62 -99 SPO 1997 10 27 16 03 81 5.1 -9 673.00 -55.3 -53.1 -54.5 62 -99 SPO 1997 10 27 16 04 81 5.1 -9 672.90 -55.3 -53.0 -54.5 62 -99 SPO 1997 10 27 16 05 81 5.2 -9 672.90 -55.2 -53.0 -54.5 62 -99 SPO 1997 10 27 16 06 81 5.3 -9 672.90 -55.3 -53.0 -54.5 62 -99 SPO 1997 10 27 16 07 81 5.2 -9 672.90 -55.3 -53.1 -54.5 62 -99 SPO 1997 10 27 16 08 81 5.2 -9 672.90 -55.3 -53.1 -54.5 62 -99 SPO 1997 10 27 16 09 81 5.1 -9 672.90 -55.3 -53.0 -54.5 62 -99 SPO 1997 10 27 16 10 81 5.1 -9 672.90 -55.3 -53.0 -54.5 62 -99 SPO 1997 10 27 16 11 81 5.0 -9 672.90 -55.3 -53.0 -54.5 62 -99 SPO 1997 10 27 16 12 81 5.0 -9 672.90 -55.2 -53.0 -54.5 61 -99 SPO 1997 10 27 16 13 80 5.0 -9 672.90 -55.2 -53.1 -54.5 61 -99 SPO 1997 10 27 16 14 80 5.1 -9 672.90 -55.2 -53.1 -54.5 61 -99 SPO 1997 10 27 16 15 80 5.2 -9 672.90 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 16 16 80 5.2 -9 672.90 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 16 17 81 5.3 -9 672.80 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 16 18 82 5.4 -9 672.80 -55.3 -53.2 -54.5 62 -99 SPO 1997 10 27 16 19 83 5.5 -9 672.80 -55.3 -53.1 -54.5 62 -99 SPO 1997 10 27 16 20 82 5.6 -9 672.80 -55.3 -53.1 -54.5 62 -99 SPO 1997 10 27 16 21 82 5.7 -9 672.80 -55.2 -53.1 -54.6 61 -99 SPO 1997 10 27 16 22 82 5.7 -9 672.80 -55.2 -53.0 -54.6 61 -99 SPO 1997 10 27 16 23 82 5.8 -9 672.70 -55.2 -53.0 -54.6 61 -99 SPO 1997 10 27 16 24 81 5.8 -9 672.70 -55.2 -53.0 -54.6 61 -99 SPO 1997 10 27 16 25 81 5.8 -9 672.70 -55.2 -53.0 -54.6 61 -99 SPO 1997 10 27 16 26 80 5.8 -9 672.80 -55.1 -53.0 -54.6 61 -99 SPO 1997 10 27 16 27 80 5.8 -9 672.80 -55.1 -53.0 -54.6 62 -99 SPO 1997 10 27 16 28 80 5.7 -9 672.80 -55.1 -53.0 -54.6 62 -99 SPO 1997 10 27 16 29 80 5.6 -9 672.80 -55.1 -53.0 -54.5 62 -99 SPO 1997 10 27 16 30 80 5.6 -9 672.80 -55.1 -53.0 -54.5 62 -99 SPO 1997 10 27 16 31 81 5.4 -9 672.80 -55.0 -53.1 -54.5 62 -99 SPO 1997 10 27 16 32 82 5.2 -9 672.80 -55.0 -53.2 -54.4 62 -99 SPO 1997 10 27 16 33 83 5.1 -9 672.80 -55.1 -53.4 -54.4 63 -99 SPO 1997 10 27 16 34 82 4.9 -9 672.80 -55.1 -53.4 -54.4 62 -99 SPO 1997 10 27 16 35 83 4.8 -9 672.80 -55.1 -53.4 -54.4 62 -99 SPO 1997 10 27 16 36 84 4.6 -9 672.90 -55.1 -53.5 -54.3 62 -99 SPO 1997 10 27 16 37 84 4.5 -9 672.90 -55.1 -53.6 -54.3 62 -99 SPO 1997 10 27 16 38 84 4.4 -9 672.90 -55.1 -53.6 -54.3 61 -99 SPO 1997 10 27 16 39 84 4.4 -9 672.90 -55.1 -53.6 -54.2 62 -99 SPO 1997 10 27 16 40 85 4.3 -9 672.90 -55.1 -53.5 -54.2 62 -99 SPO 1997 10 27 16 41 85 4.3 -9 672.90 -55.1 -53.6 -54.2 62 -99 SPO 1997 10 27 16 42 86 4.3 -9 672.90 -55.1 -53.6 -54.1 63 -99 SPO 1997 10 27 16 43 87 4.3 -9 672.90 -55.1 -53.7 -54.1 63 -99 SPO 1997 10 27 16 44 86 4.3 -9 672.90 -55.2 -53.7 -54.1 64 -99 SPO 1997 10 27 16 45 85 4.4 -9 672.90 -55.2 -53.7 -54.1 63 -99 SPO 1997 10 27 16 46 85 4.4 -9 672.90 -55.2 -53.7 -54.1 62 -99 SPO 1997 10 27 16 47 86 4.5 -9 672.90 -55.2 -53.6 -54.1 62 -99 SPO 1997 10 27 16 48 87 4.5 -9 672.80 -55.2 -53.7 -54.1 61 -99 SPO 1997 10 27 16 49 86 4.6 -9 672.80 -55.3 -53.7 -54.2 62 -99 SPO 1997 10 27 16 50 87 4.6 -9 672.80 -55.3 -53.6 -54.2 62 -99 SPO 1997 10 27 16 51 86 4.5 -9 672.80 -55.3 -53.6 -54.1 62 -99 SPO 1997 10 27 16 52 85 4.4 -9 672.80 -55.2 -53.6 -54.1 61 -99 SPO 1997 10 27 16 53 84 4.4 -9 672.80 -55.2 -53.5 -54.1 62 -99 SPO 1997 10 27 16 54 85 4.4 -9 672.80 -55.2 -53.5 -54.1 62 -99 SPO 1997 10 27 16 55 86 4.3 -9 672.80 -55.2 -53.5 -54.0 62 -99 SPO 1997 10 27 16 56 87 4.2 -9 672.80 -55.2 -53.5 -54.0 62 -99 SPO 1997 10 27 16 57 86 4.1 -9 672.80 -55.2 -53.6 -54.0 62 -99 SPO 1997 10 27 16 58 85 4.0 -9 672.80 -55.2 -53.6 -53.9 62 -99 SPO 1997 10 27 16 59 84 4.1 -9 672.80 -55.2 -53.6 -53.9 62 -99 SPO 1997 10 27 17 00 83 4.2 -9 672.80 -55.1 -53.6 -53.9 62 0 SPO 1997 10 27 17 01 82 4.2 -9 672.80 -55.1 -53.5 -53.9 62 -99 SPO 1997 10 27 17 02 81 4.3 -9 672.80 -55.2 -53.4 -54.0 62 -99 SPO 1997 10 27 17 03 81 4.4 -9 672.80 -55.2 -53.4 -54.0 62 -99 SPO 1997 10 27 17 04 81 4.3 -9 672.80 -55.2 -53.4 -54.0 62 -99 SPO 1997 10 27 17 05 81 4.3 -9 672.80 -55.2 -53.4 -54.0 62 -99 SPO 1997 10 27 17 06 81 4.2 -9 672.90 -55.2 -53.4 -54.0 62 -99 SPO 1997 10 27 17 07 82 4.3 -9 672.90 -55.1 -53.4 -54.0 62 -99 SPO 1997 10 27 17 08 82 4.3 -9 672.90 -55.1 -53.5 -53.9 62 -99 SPO 1997 10 27 17 09 82 4.4 -9 672.90 -55.1 -53.5 -53.9 63 -99 SPO 1997 10 27 17 10 82 4.4 -9 672.90 -55.1 -53.5 -53.9 63 -99 SPO 1997 10 27 17 11 82 4.4 -9 672.90 -55.1 -53.4 -53.9 64 -99 SPO 1997 10 27 17 12 83 4.4 -9 672.80 -55.1 -53.4 -53.9 65 -99 SPO 1997 10 27 17 13 83 4.3 -9 672.80 -55.1 -53.4 -53.9 65 -99 SPO 1997 10 27 17 14 82 4.2 -9 672.80 -55.1 -53.4 -53.9 65 -99 SPO 1997 10 27 17 15 82 4.2 -9 672.80 -55.1 -53.3 -53.9 64 -99 SPO 1997 10 27 17 16 83 4.1 -9 672.80 -55.1 -53.3 -53.9 63 -99 SPO 1997 10 27 17 17 81 4.2 -9 672.80 -55.1 -53.3 -53.9 63 -99 SPO 1997 10 27 17 18 81 4.2 -9 672.80 -55.1 -53.3 -53.9 63 -99 SPO 1997 10 27 17 19 82 4.4 -9 672.80 -55.1 -53.3 -53.9 63 -99 SPO 1997 10 27 17 20 83 4.5 -9 672.80 -55.1 -53.1 -53.9 63 -99 SPO 1997 10 27 17 21 82 4.5 -9 672.80 -55.1 -53.1 -53.9 64 -99 SPO 1997 10 27 17 22 84 4.5 -9 672.80 -55.1 -53.1 -54.0 64 -99 SPO 1997 10 27 17 23 85 4.5 -9 672.80 -55.1 -53.1 -54.0 64 -99 SPO 1997 10 27 17 24 85 4.6 -9 672.80 -55.2 -53.2 -54.0 65 -99 SPO 1997 10 27 17 25 84 4.7 -9 672.80 -55.2 -53.2 -54.0 65 -99 SPO 1997 10 27 17 26 83 4.8 -9 672.80 -55.1 -53.1 -54.1 64 -99 SPO 1997 10 27 17 27 82 5.0 -9 672.80 -55.2 -53.0 -54.1 65 -99 SPO 1997 10 27 17 28 81 5.1 -9 672.80 -55.1 -53.0 -54.2 64 -99 SPO 1997 10 27 17 29 80 5.2 -9 672.70 -55.1 -53.0 -54.2 64 -99 SPO 1997 10 27 17 30 80 5.2 -9 672.70 -55.1 -53.0 -54.2 64 -99 SPO 1997 10 27 17 31 80 5.2 -9 672.70 -55.0 -52.9 -54.2 64 -99 SPO 1997 10 27 17 32 80 5.2 -9 672.70 -55.0 -53.0 -54.3 65 -99 SPO 1997 10 27 17 33 81 5.2 -9 672.70 -55.0 -53.0 -54.3 65 -99 SPO 1997 10 27 17 34 81 5.1 -9 672.70 -55.1 -53.0 -54.3 66 -99 SPO 1997 10 27 17 35 81 5.1 -9 672.70 -55.1 -53.1 -54.3 66 -99 SPO 1997 10 27 17 36 82 5.0 -9 672.70 -55.1 -53.0 -54.2 66 -99 SPO 1997 10 27 17 37 82 5.0 -9 672.70 -55.0 -53.0 -54.2 65 -99 SPO 1997 10 27 17 38 83 4.9 -9 672.70 -55.1 -53.0 -54.2 66 -99 SPO 1997 10 27 17 39 84 4.8 -9 672.70 -55.1 -53.0 -54.1 65 -99 SPO 1997 10 27 17 40 83 4.8 -9 672.70 -55.1 -53.0 -54.2 65 -99 SPO 1997 10 27 17 41 82 4.9 -9 672.70 -55.1 -52.9 -54.2 64 -99 SPO 1997 10 27 17 42 82 4.8 -9 672.70 -55.1 -52.9 -54.1 63 -99 SPO 1997 10 27 17 43 80 4.7 -9 672.70 -55.1 -53.0 -54.2 64 -99 SPO 1997 10 27 17 44 79 4.6 -9 672.70 -55.1 -53.0 -54.2 64 -99 SPO 1997 10 27 17 45 79 4.5 -9 672.70 -55.1 -52.9 -54.2 65 -99 SPO 1997 10 27 17 46 78 4.5 -9 672.70 -55.2 -52.9 -54.2 65 -99 SPO 1997 10 27 17 47 79 4.4 -9 672.70 -55.2 -52.9 -54.3 65 -99 SPO 1997 10 27 17 48 79 4.3 -9 672.70 -55.2 -53.0 -54.2 65 -99 SPO 1997 10 27 17 49 79 4.2 -9 672.70 -55.2 -53.0 -54.2 65 -99 SPO 1997 10 27 17 50 78 4.1 -9 672.70 -55.2 -53.0 -54.2 65 -99 SPO 1997 10 27 17 51 78 4.0 -9 672.70 -55.3 -53.0 -54.2 65 -99 SPO 1997 10 27 17 52 78 3.9 -9 672.70 -55.2 -53.1 -54.1 64 -99 SPO 1997 10 27 17 53 79 3.9 -9 672.70 -55.2 -53.1 -54.1 64 -99 SPO 1997 10 27 17 54 79 3.9 -9 672.70 -55.2 -53.1 -54.0 63 -99 SPO 1997 10 27 17 55 79 3.8 -9 672.60 -55.2 -53.1 -54.0 63 -99 SPO 1997 10 27 17 56 79 3.9 -9 672.60 -55.2 -53.1 -54.1 63 -99 SPO 1997 10 27 17 57 80 4.0 -9 672.60 -55.3 -53.1 -54.0 64 -99 SPO 1997 10 27 17 58 80 4.2 -9 672.60 -55.3 -53.0 -54.1 64 -99 SPO 1997 10 27 17 59 80 4.3 -9 672.60 -55.3 -53.0 -54.1 64 -99 SPO 1997 10 27 18 00 80 4.6 -9 672.60 -55.3 -53.0 -54.1 64 0 SPO 1997 10 27 18 01 80 4.5 -9 672.60 -55.3 -53.0 -54.2 64 -99 SPO 1997 10 27 18 02 79 4.3 -9 672.60 -55.4 -53.0 -54.2 65 -99 SPO 1997 10 27 18 03 78 4.4 -9 672.60 -55.4 -53.0 -54.2 65 -99 SPO 1997 10 27 18 04 78 4.2 -9 672.60 -55.4 -52.9 -54.2 64 -99 SPO 1997 10 27 18 05 79 4.1 -9 672.60 -55.3 -52.9 -54.2 63 -99 SPO 1997 10 27 18 06 80 3.8 -9 672.60 -55.3 -52.9 -54.1 62 -99 SPO 1997 10 27 18 07 82 3.5 -9 672.60 -55.3 -53.0 -54.0 62 -99 SPO 1997 10 27 18 08 84 3.2 -9 672.60 -55.4 -53.2 -53.8 62 -99 SPO 1997 10 27 18 09 85 3.2 -9 672.60 -55.4 -53.2 -53.6 62 -99 SPO 1997 10 27 18 10 87 3.0 -9 672.60 -55.3 -53.3 -53.6 62 -99 SPO 1997 10 27 18 11 87 2.8 -9 672.60 -55.3 -53.4 -53.4 62 -99 SPO 1997 10 27 18 12 88 2.7 -9 672.60 -55.3 -53.4 -53.4 63 -99 SPO 1997 10 27 18 13 88 2.8 -9 672.60 -55.3 -53.4 -53.4 63 -99 SPO 1997 10 27 18 14 87 2.9 -9 672.60 -55.4 -53.4 -53.3 65 -99 SPO 1997 10 27 18 15 84 2.8 -9 672.60 -55.4 -53.4 -53.3 65 -99 SPO 1997 10 27 18 16 85 2.9 -9 672.60 -55.4 -53.4 -53.3 65 -99 SPO 1997 10 27 18 17 83 2.8 -9 672.70 -55.4 -53.5 -53.4 65 -99 SPO 1997 10 27 18 18 82 2.9 -9 672.70 -55.4 -53.5 -53.4 65 -99 SPO 1997 10 27 18 19 81 3.0 -9 672.70 -55.4 -53.5 -53.5 65 -99 SPO 1997 10 27 18 20 83 3.2 -9 672.70 -55.4 -53.5 -53.5 65 -99 SPO 1997 10 27 18 21 83 3.0 -9 672.60 -55.5 -53.5 -53.4 65 -99 SPO 1997 10 27 18 22 84 3.0 -9 672.60 -55.5 -53.4 -53.4 65 -99 SPO 1997 10 27 18 23 86 2.9 -9 672.70 -55.5 -53.6 -53.3 64 -99 SPO 1997 10 27 18 24 87 2.9 -9 672.70 -55.5 -53.6 -53.3 65 -99 SPO 1997 10 27 18 25 88 2.9 -9 672.70 -55.4 -53.6 -53.3 64 -99 SPO 1997 10 27 18 26 88 3.2 -9 672.60 -55.5 -53.6 -53.3 65 -99 SPO 1997 10 27 18 27 89 3.4 -9 672.60 -55.5 -53.4 -53.4 65 -99 SPO 1997 10 27 18 28 87 3.8 -9 672.60 -55.4 -53.2 -53.6 64 -99 SPO 1997 10 27 18 29 86 4.0 -9 672.60 -55.5 -53.1 -53.7 65 -99 SPO 1997 10 27 18 30 84 4.3 -9 672.60 -55.6 -53.0 -53.8 66 -99 SPO 1997 10 27 18 31 82 4.5 -9 672.60 -55.6 -52.8 -54.0 66 -99 SPO 1997 10 27 18 32 81 4.8 -9 672.50 -55.6 -52.7 -54.2 66 -99 SPO 1997 10 27 18 33 80 4.9 -9 672.50 -55.6 -52.6 -54.4 65 -99 SPO 1997 10 27 18 34 79 5.1 -9 672.50 -55.6 -52.5 -54.4 65 -99 SPO 1997 10 27 18 35 79 5.2 -9 672.50 -55.6 -52.4 -54.5 65 -99 SPO 1997 10 27 18 36 79 5.2 -9 672.50 -55.6 -52.3 -54.6 64 -99 SPO 1997 10 27 18 37 79 5.4 -9 672.50 -55.6 -52.2 -54.6 64 -99 SPO 1997 10 27 18 38 80 5.5 -9 672.50 -55.5 -52.2 -54.6 64 -99 SPO 1997 10 27 18 39 79 5.5 -9 672.50 -55.5 -52.2 -54.6 65 -99 SPO 1997 10 27 18 40 78 5.4 -9 672.50 -55.5 -52.2 -54.6 65 -99 SPO 1997 10 27 18 41 79 5.4 -9 672.50 -55.5 -52.2 -54.6 65 -99 SPO 1997 10 27 18 42 78 5.3 -9 672.50 -55.5 -52.1 -54.7 65 -99 SPO 1997 10 27 18 43 76 5.3 -9 672.50 -55.5 -52.1 -54.8 65 -99 SPO 1997 10 27 18 44 74 5.3 -9 672.50 -55.5 -52.1 -54.8 65 -99 SPO 1997 10 27 18 45 74 5.4 -9 672.50 -55.5 -52.1 -54.8 65 -99 SPO 1997 10 27 18 46 74 5.3 -9 672.50 -55.5 -52.0 -54.9 64 -99 SPO 1997 10 27 18 47 73 5.4 -9 672.50 -55.4 -52.0 -54.9 62 -99 SPO 1997 10 27 18 48 72 5.5 -9 672.50 -55.4 -52.0 -54.9 62 -99 SPO 1997 10 27 18 49 72 5.5 -9 672.50 -55.4 -52.0 -54.9 62 -99 SPO 1997 10 27 18 50 72 5.5 -9 672.50 -55.5 -52.0 -55.0 63 -99 SPO 1997 10 27 18 51 70 5.6 -9 672.50 -55.5 -51.9 -55.0 63 -99 SPO 1997 10 27 18 52 71 5.5 -9 672.50 -55.6 -51.9 -55.0 64 -99 SPO 1997 10 27 18 53 70 5.6 -9 672.50 -55.6 -51.9 -55.0 64 -99 SPO 1997 10 27 18 54 71 5.5 -9 672.50 -55.6 -51.9 -55.1 64 -99 SPO 1997 10 27 18 55 72 5.4 -9 672.50 -55.6 -51.9 -55.1 63 -99 SPO 1997 10 27 18 56 71 5.4 -9 672.50 -55.6 -51.9 -55.1 62 -99 SPO 1997 10 27 18 57 71 5.3 -9 672.50 -55.6 -51.9 -55.1 63 -99 SPO 1997 10 27 18 58 70 5.3 -9 672.50 -55.6 -51.9 -55.0 63 -99 SPO 1997 10 27 18 59 69 5.3 -9 672.50 -55.6 -51.9 -55.1 62 -99 SPO 1997 10 27 19 00 70 5.2 -9 672.50 -55.7 -52.0 -55.1 63 0 SPO 1997 10 27 19 01 72 5.1 -9 672.50 -55.7 -52.0 -55.1 63 -99 SPO 1997 10 27 19 02 72 5.2 -9 672.50 -55.7 -52.0 -55.1 62 -99 SPO 1997 10 27 19 03 71 5.3 -9 672.40 -55.7 -52.1 -55.2 62 -99 SPO 1997 10 27 19 04 70 5.5 -9 672.40 -55.7 -52.1 -55.2 63 -99 SPO 1997 10 27 19 05 69 5.7 -9 672.40 -55.7 -52.0 -55.2 63 -99 SPO 1997 10 27 19 06 68 5.7 -9 672.40 -55.7 -52.0 -55.2 63 -99 SPO 1997 10 27 19 07 69 5.7 -9 672.40 -55.7 -52.0 -55.2 63 -99 SPO 1997 10 27 19 08 69 5.6 -9 672.40 -55.7 -52.1 -55.2 64 -99 SPO 1997 10 27 19 09 69 5.5 -9 672.40 -55.7 -52.1 -55.2 64 -99 SPO 1997 10 27 19 10 69 5.6 -9 672.40 -55.7 -52.2 -55.2 64 -99 SPO 1997 10 27 19 11 70 5.5 -9 672.40 -55.7 -52.2 -55.2 63 -99 SPO 1997 10 27 19 12 70 5.3 -9 672.40 -55.8 -52.2 -55.3 64 -99 SPO 1997 10 27 19 13 69 5.2 -9 672.40 -55.8 -52.2 -55.2 62 -99 SPO 1997 10 27 19 14 70 5.0 -9 672.40 -55.8 -52.3 -55.2 61 -99 SPO 1997 10 27 19 15 70 4.8 -9 672.40 -55.8 -52.4 -55.2 61 -99 SPO 1997 10 27 19 16 72 4.7 -9 672.40 -55.7 -52.4 -55.2 61 -99 SPO 1997 10 27 19 17 72 4.7 -9 672.40 -55.8 -52.4 -55.1 63 -99 SPO 1997 10 27 19 18 72 4.5 -9 672.40 -55.8 -52.5 -55.1 64 -99 SPO 1997 10 27 19 19 72 4.4 -9 672.40 -55.8 -52.5 -55.0 64 -99 SPO 1997 10 27 19 20 73 4.1 -9 672.40 -55.8 -52.5 -55.0 65 -99 SPO 1997 10 27 19 21 74 4.1 -9 672.50 -55.8 -52.6 -55.0 65 -99 SPO 1997 10 27 19 22 75 4.1 -9 672.50 -55.7 -52.6 -55.0 64 -99 SPO 1997 10 27 19 23 74 4.0 -9 672.50 -55.7 -52.6 -54.9 64 -99 SPO 1997 10 27 19 24 72 4.1 -9 672.50 -55.7 -52.6 -54.9 64 -99 SPO 1997 10 27 19 25 70 4.2 -9 672.50 -55.8 -52.6 -55.0 64 -99 SPO 1997 10 27 19 26 69 4.3 -9 672.50 -55.8 -52.5 -55.0 64 -99 SPO 1997 10 27 19 27 69 4.3 -9 672.50 -55.8 -52.6 -55.0 64 -99 SPO 1997 10 27 19 28 69 4.2 -9 672.50 -55.8 -52.6 -55.0 64 -99 SPO 1997 10 27 19 29 69 4.0 -9 672.50 -55.8 -52.6 -55.0 65 -99 SPO 1997 10 27 19 30 72 4.0 -9 672.50 -55.8 -52.7 -55.0 65 -99 SPO 1997 10 27 19 31 70 4.2 -9 672.50 -55.8 -52.8 -55.0 64 -99 SPO 1997 10 27 19 32 70 4.1 -9 672.50 -55.8 -52.8 -55.0 64 -99 SPO 1997 10 27 19 33 68 4.3 -9 672.50 -55.8 -52.8 -55.0 64 -99 SPO 1997 10 27 19 34 68 4.3 -9 672.50 -55.9 -52.7 -55.1 65 -99 SPO 1997 10 27 19 35 68 4.4 -9 672.50 -55.9 -52.6 -55.1 65 -99 SPO 1997 10 27 19 36 67 4.4 -9 672.50 -55.9 -52.6 -55.1 64 -99 SPO 1997 10 27 19 37 67 4.4 -9 672.50 -56.0 -52.4 -55.1 65 -99 SPO 1997 10 27 19 38 68 4.3 -9 672.50 -55.9 -52.4 -55.1 64 -99 SPO 1997 10 27 19 39 68 4.2 -9 672.50 -55.9 -52.4 -55.0 63 -99 SPO 1997 10 27 19 40 71 4.1 -9 672.50 -55.9 -52.4 -55.0 63 -99 SPO 1997 10 27 19 41 73 3.9 -9 672.50 -56.0 -52.4 -54.9 63 -99 SPO 1997 10 27 19 42 75 3.8 -9 672.40 -56.0 -52.5 -54.8 63 -99 SPO 1997 10 27 19 43 74 3.8 -9 672.40 -56.1 -52.6 -54.8 64 -99 SPO 1997 10 27 19 44 73 3.9 -9 672.40 -56.1 -52.6 -54.9 64 -99 SPO 1997 10 27 19 45 72 4.0 -9 672.40 -56.2 -52.7 -55.0 64 -99 SPO 1997 10 27 19 46 72 4.1 -9 672.40 -56.2 -52.7 -55.0 64 -99 SPO 1997 10 27 19 47 73 4.0 -9 672.40 -56.2 -52.7 -55.0 64 -99 SPO 1997 10 27 19 48 73 3.9 -9 672.40 -56.2 -52.7 -55.0 64 -99 SPO 1997 10 27 19 49 72 3.9 -9 672.40 -56.2 -52.7 -55.0 64 -99 SPO 1997 10 27 19 50 73 3.9 -9 672.40 -56.2 -52.7 -55.0 63 -99 SPO 1997 10 27 19 51 74 3.9 -9 672.40 -56.2 -52.7 -54.9 63 -99 SPO 1997 10 27 19 52 76 3.8 -9 672.40 -56.2 -52.7 -55.0 63 -99 SPO 1997 10 27 19 53 75 4.1 -9 672.40 -56.3 -52.7 -55.0 64 -99 SPO 1997 10 27 19 54 74 4.2 -9 672.40 -56.3 -52.7 -55.1 64 -99 SPO 1997 10 27 19 55 74 4.3 -9 672.40 -56.3 -52.7 -55.1 64 -99 SPO 1997 10 27 19 56 73 4.3 -9 672.40 -56.3 -52.6 -55.1 64 -99 SPO 1997 10 27 19 57 74 4.2 -9 672.40 -56.3 -52.6 -55.1 64 -99 SPO 1997 10 27 19 58 73 4.2 -9 672.40 -56.3 -52.6 -55.1 64 -99 SPO 1997 10 27 19 59 74 4.0 -9 672.40 -56.2 -52.6 -55.0 64 -99 SPO 1997 10 27 20 00 74 4.1 -9 672.40 -56.2 -52.6 -55.0 64 0 SPO 1997 10 27 20 01 75 4.2 -9 672.40 -56.2 -52.6 -55.1 65 -99 SPO 1997 10 27 20 02 74 4.5 -9 672.40 -56.2 -52.6 -55.1 65 -99 SPO 1997 10 27 20 03 72 4.5 -9 672.40 -56.2 -52.5 -55.2 65 -99 SPO 1997 10 27 20 04 70 4.4 -9 672.40 -56.3 -52.5 -55.3 65 -99 SPO 1997 10 27 20 05 71 4.5 -9 672.40 -56.3 -52.5 -55.4 65 -99 SPO 1997 10 27 20 06 70 4.4 -9 672.40 -56.3 -52.5 -55.4 65 -99 SPO 1997 10 27 20 07 69 4.5 -9 672.40 -56.4 -52.5 -55.4 66 -99 SPO 1997 10 27 20 08 68 4.5 -9 672.40 -56.3 -52.5 -55.4 65 -99 SPO 1997 10 27 20 09 67 4.5 -9 672.40 -56.3 -52.6 -55.4 66 -99 SPO 1997 10 27 20 10 67 4.5 -9 672.30 -56.3 -52.6 -55.5 66 -99 SPO 1997 10 27 20 11 66 4.7 -9 672.40 -56.3 -52.6 -55.5 67 -99 SPO 1997 10 27 20 12 66 4.8 -9 672.30 -56.3 -52.6 -55.5 67 -99 SPO 1997 10 27 20 13 65 4.7 -9 672.30 -56.2 -52.4 -55.5 66 -99 SPO 1997 10 27 20 14 65 4.6 -9 672.30 -56.1 -52.5 -55.4 65 -99 SPO 1997 10 27 20 15 65 4.6 -9 672.40 -56.1 -52.4 -55.4 65 -99 SPO 1997 10 27 20 16 67 4.5 -9 672.40 -56.1 -52.4 -55.4 65 -99 SPO 1997 10 27 20 17 68 4.4 -9 672.40 -56.2 -52.4 -55.4 66 -99 SPO 1997 10 27 20 18 68 4.4 -9 672.40 -56.2 -52.4 -55.4 65 -99 SPO 1997 10 27 20 19 69 4.5 -9 672.40 -56.2 -52.4 -55.3 64 -99 SPO 1997 10 27 20 20 69 4.5 -9 672.40 -56.2 -52.4 -55.2 64 -99 SPO 1997 10 27 20 21 70 4.7 -9 672.40 -56.2 -52.3 -55.2 64 -99 SPO 1997 10 27 20 22 70 4.6 -9 672.40 -56.2 -52.3 -55.2 65 -99 SPO 1997 10 27 20 23 70 4.4 -9 672.40 -56.2 -52.3 -55.2 65 -99 SPO 1997 10 27 20 24 69 4.3 -9 672.40 -56.2 -52.4 -55.3 66 -99 SPO 1997 10 27 20 25 71 5.0 -9 672.50 -56.2 -52.3 -55.2 66 -99 SPO 1997 10 27 20 26 71 4.4 -9 672.40 -56.1 -52.2 -55.0 65 -99 SPO 1997 10 27 20 27 72 4.5 -9 672.40 -56.2 -52.3 -55.0 65 -99 SPO 1997 10 27 20 28 72 4.3 -9 672.40 -56.1 -52.4 -55.0 65 -99 SPO 1997 10 27 20 29 72 4.7 -9 672.40 -56.1 -52.3 -54.9 66 -99 SPO 1997 10 27 20 30 72 4.6 -9 672.50 -56.0 -51.9 -54.8 65 -99 SPO 1997 10 27 20 31 67 3.5 -9 672.40 -56.1 -52.2 -55.0 65 -99 SPO 1997 10 27 20 32 72 4.4 -9 672.40 -56.0 -52.4 -55.0 65 -99 SPO 1997 10 27 20 33 73 4.8 -9 672.40 -56.0 -52.0 -54.8 65 -99 SPO 1997 10 27 20 34 71 4.4 -9 672.40 -55.9 -52.2 -54.8 65 -99 SPO 1997 10 27 20 35 74 4.0 -9 672.40 -56.0 -52.2 -54.8 65 -99 SPO 1997 10 27 20 36 75 4.1 -9 672.40 -56.1 -52.2 -54.7 67 -99 SPO 1997 10 27 20 37 74 4.3 -9 672.40 -56.0 -52.0 -54.7 66 -99 SPO 1997 10 27 20 38 76 4.1 -9 672.40 -56.0 -52.1 -54.6 66 -99 SPO 1997 10 27 20 39 76 4.5 -9 672.40 -56.0 -52.0 -54.6 66 -99 SPO 1997 10 27 20 40 75 4.1 -9 672.30 -56.2 -52.1 -54.6 68 -99 SPO 1997 10 27 20 41 77 3.9 -9 672.40 -56.2 -52.2 -54.7 67 -99 SPO 1997 10 27 20 42 76 3.8 -9 672.40 -56.3 -52.4 -54.9 68 -99 SPO 1997 10 27 20 43 73 4.0 -9 672.30 -56.2 -52.4 -54.9 67 -99 SPO 1997 10 27 20 44 72 4.3 -9 672.40 -56.2 -52.4 -54.9 66 -99 SPO 1997 10 27 20 45 70 4.6 -9 672.40 -56.2 -52.2 -54.9 66 -99 SPO 1997 10 27 20 46 68 4.4 -9 672.30 -56.1 -52.2 -55.0 66 -99 SPO 1997 10 27 20 47 67 4.4 -9 672.40 -56.1 -52.3 -55.2 66 -99 SPO 1997 10 27 20 48 68 4.7 -9 672.40 -56.0 -52.2 -55.1 66 -99 SPO 1997 10 27 20 49 68 5.1 -9 672.30 -55.9 -52.2 -55.0 65 -99 SPO 1997 10 27 20 50 69 4.9 -9 672.30 -55.9 -52.0 -54.9 66 -99 SPO 1997 10 27 20 51 69 4.2 -9 672.30 -55.9 -52.2 -55.0 66 -99 SPO 1997 10 27 20 52 72 4.3 -9 672.30 -55.8 -52.4 -55.0 65 -99 SPO 1997 10 27 20 53 72 4.1 -9 672.40 -55.8 -52.3 -54.8 66 -99 SPO 1997 10 27 20 54 71 3.6 -9 672.40 -55.8 -52.4 -54.7 66 -99 SPO 1997 10 27 20 55 71 3.5 -9 672.40 -55.8 -52.5 -54.6 67 -99 SPO 1997 10 27 20 56 74 3.7 -9 672.40 -55.7 -52.4 -54.4 66 -99 SPO 1997 10 27 20 57 70 3.0 -9 672.40 -55.8 -52.5 -54.2 66 -99 SPO 1997 10 27 20 58 73 3.2 -9 672.40 -55.8 -52.6 -54.2 65 -99 SPO 1997 10 27 20 59 73 3.7 -9 672.40 -55.7 -52.5 -54.0 65 -99 SPO 1997 10 27 21 00 71 3.4 -9 672.40 -55.7 -52.5 -54.0 65 0 SPO 1997 10 27 21 01 73 3.4 -9 672.40 -55.7 -52.6 -54.2 65 -99 SPO 1997 10 27 21 02 70 3.3 -9 672.40 -55.6 -52.5 -54.2 65 -99 SPO 1997 10 27 21 03 72 3.5 -9 672.40 -55.8 -52.6 -54.4 66 -99 SPO 1997 10 27 21 04 71 3.7 -9 672.40 -55.8 -52.6 -54.4 67 -99 SPO 1997 10 27 21 05 71 4.1 -9 672.40 -55.9 -52.6 -54.6 68 -99 SPO 1997 10 27 21 06 70 4.2 -9 672.30 -56.0 -52.6 -54.7 69 -99 SPO 1997 10 27 21 07 70 4.4 -9 672.40 -56.0 -52.5 -54.7 68 -99 SPO 1997 10 27 21 08 69 4.1 -9 672.30 -56.0 -52.4 -54.8 68 -99 SPO 1997 10 27 21 09 69 4.1 -9 672.40 -56.0 -52.4 -54.8 67 -99 SPO 1997 10 27 21 10 69 3.8 -9 672.40 -56.0 -52.3 -54.8 67 -99 SPO 1997 10 27 21 11 70 3.7 -9 672.30 -56.0 -52.4 -54.7 65 -99 SPO 1997 10 27 21 12 70 3.5 -9 672.40 -56.0 -52.4 -54.6 65 -99 SPO 1997 10 27 21 13 71 3.5 -9 672.30 -56.1 -52.4 -54.5 66 -99 SPO 1997 10 27 21 14 69 3.3 -9 672.40 -56.1 -52.5 -54.5 66 -99 SPO 1997 10 27 21 15 66 3.5 -9 672.40 -56.1 -52.5 -54.6 66 -99 SPO 1997 10 27 21 16 67 3.4 -9 672.30 -56.1 -52.5 -54.8 66 -99 SPO 1997 10 27 21 17 67 3.8 -9 672.30 -56.2 -52.5 -54.8 67 -99 SPO 1997 10 27 21 18 66 4.0 -9 672.30 -56.2 -52.4 -54.9 67 -99 SPO 1997 10 27 21 19 65 4.1 -9 672.20 -56.2 -52.4 -55.0 67 -99 SPO 1997 10 27 21 20 62 3.9 -9 672.20 -56.2 -52.4 -55.1 67 -99 SPO 1997 10 27 21 21 62 4.0 -9 672.30 -56.3 -52.5 -55.2 67 -99 SPO 1997 10 27 21 22 64 4.4 -9 672.20 -56.2 -52.5 -55.2 66 -99 SPO 1997 10 27 21 23 66 4.6 -9 672.20 -56.2 -52.5 -55.2 65 -99 SPO 1997 10 27 21 24 66 4.7 -9 672.20 -56.2 -52.5 -55.2 65 -99 SPO 1997 10 27 21 25 64 4.6 -9 672.20 -56.2 -52.4 -55.3 64 -99 SPO 1997 10 27 21 26 64 4.7 -9 672.20 -56.2 -52.4 -55.3 64 -99 SPO 1997 10 27 21 27 65 4.7 -9 672.20 -56.1 -52.4 -55.3 64 -99 SPO 1997 10 27 21 28 65 4.7 -9 672.20 -56.0 -52.4 -55.2 65 -99 SPO 1997 10 27 21 29 67 4.9 -9 672.20 -55.9 -52.4 -55.2 65 -99 SPO 1997 10 27 21 30 68 5.1 -9 672.20 -55.8 -52.4 -55.2 65 -99 SPO 1997 10 27 21 31 68 5.2 -9 672.20 -55.7 -52.3 -55.1 65 -99 SPO 1997 10 27 21 32 68 5.3 -9 672.20 -55.7 -52.2 -55.2 66 -99 SPO 1997 10 27 21 33 69 5.4 -9 672.20 -55.7 -52.2 -55.2 66 -99 SPO 1997 10 27 21 34 69 5.6 -9 672.20 -55.6 -52.0 -55.2 65 -99 SPO 1997 10 27 21 35 68 5.5 -9 672.20 -55.5 -52.0 -55.1 65 -99 SPO 1997 10 27 21 36 68 5.6 -9 672.20 -55.5 -52.0 -55.1 65 -99 SPO 1997 10 27 21 37 68 5.7 -9 672.20 -55.4 -52.0 -55.1 64 -99 SPO 1997 10 27 21 38 68 5.5 -9 672.20 -55.4 -52.0 -55.1 64 -99 SPO 1997 10 27 21 39 67 5.4 -9 672.20 -55.4 -52.0 -55.0 64 -99 SPO 1997 10 27 21 40 66 5.3 -9 672.20 -55.4 -52.0 -55.0 64 -99 SPO 1997 10 27 21 41 65 5.2 -9 672.20 -55.4 -52.0 -55.0 65 -99 SPO 1997 10 27 21 42 66 5.2 -9 672.20 -55.5 -52.1 -55.1 65 -99 SPO 1997 10 27 21 43 65 5.2 -9 672.20 -55.5 -52.1 -55.0 65 -99 SPO 1997 10 27 21 44 66 5.2 -9 672.20 -55.5 -52.1 -55.0 66 -99 SPO 1997 10 27 21 45 64 5.1 -9 672.20 -55.5 -52.1 -55.0 66 -99 SPO 1997 10 27 21 46 64 5.1 -9 672.20 -55.5 -52.0 -55.0 66 -99 SPO 1997 10 27 21 47 65 5.0 -9 672.20 -55.5 -52.1 -55.1 66 -99 SPO 1997 10 27 21 48 65 5.0 -9 672.20 -55.5 -52.2 -55.0 65 -99 SPO 1997 10 27 21 49 65 5.0 -9 672.20 -55.4 -52.1 -55.0 64 -99 SPO 1997 10 27 21 50 64 4.8 -9 672.20 -55.4 -52.1 -55.0 64 -99 SPO 1997 10 27 21 51 64 4.8 -9 672.20 -55.4 -52.1 -55.0 65 -99 SPO 1997 10 27 21 52 64 4.8 -9 672.20 -55.4 -52.0 -55.0 65 -99 SPO 1997 10 27 21 53 64 4.9 -9 672.20 -55.4 -52.2 -55.0 65 -99 SPO 1997 10 27 21 54 65 5.0 -9 672.20 -55.3 -52.1 -55.0 65 -99 SPO 1997 10 27 21 55 66 5.0 -9 672.20 -55.4 -52.1 -55.0 66 -99 SPO 1997 10 27 21 56 66 5.0 -9 672.20 -55.3 -52.0 -55.0 65 -99 SPO 1997 10 27 21 57 63 4.4 -9 672.20 -55.4 -52.0 -55.0 66 -99 SPO 1997 10 27 21 58 60 4.3 -9 672.20 -55.4 -52.2 -55.0 67 -99 SPO 1997 10 27 21 59 60 4.1 -9 672.20 -55.4 -52.2 -54.9 67 -99 SPO 1997 10 27 22 00 60 3.8 -9 672.20 -55.4 -52.4 -54.9 67 0 SPO 1997 10 27 22 01 60 4.0 -9 672.20 -55.4 -52.4 -54.8 67 -99 SPO 1997 10 27 22 02 60 3.6 -9 672.30 -55.4 -52.4 -54.8 66 -99 SPO 1997 10 27 22 03 58 3.2 -9 672.30 -55.4 -52.5 -54.7 66 -99 SPO 1997 10 27 22 04 61 3.2 -9 672.30 -55.4 -52.7 -54.6 66 -99 SPO 1997 10 27 22 05 62 3.4 -9 672.30 -55.4 -52.7 -54.5 66 -99 SPO 1997 10 27 22 06 63 3.1 -9 672.20 -55.3 -52.8 -54.4 66 -99 SPO 1997 10 27 22 07 63 3.0 -9 672.20 -55.3 -52.9 -54.3 67 -99 SPO 1997 10 27 22 08 62 2.6 -9 672.20 -55.3 -53.0 -54.3 68 -99 SPO 1997 10 27 22 09 61 2.5 -9 672.20 -55.4 -53.2 -54.3 69 -99 SPO 1997 10 27 22 10 64 2.5 -9 672.20 -55.4 -53.4 -54.1 69 -99 SPO 1997 10 27 22 11 66 2.3 -9 672.20 -55.3 -53.4 -53.8 69 -99 SPO 1997 10 27 22 12 70 2.3 -9 672.20 -55.4 -53.4 -53.4 70 -99 SPO 1997 10 27 22 13 69 2.2 -9 672.20 -55.4 -53.5 -53.1 70 -99 SPO 1997 10 27 22 14 67 2.2 -9 672.20 -55.3 -53.6 -53.0 69 -99 SPO 1997 10 27 22 15 65 2.2 -9 672.20 -55.2 -53.6 -53.1 68 -99 SPO 1997 10 27 22 16 62 2.2 -9 672.20 -55.3 -53.7 -53.2 69 -99 SPO 1997 10 27 22 17 59 2.2 -9 672.30 -55.3 -53.7 -53.5 69 -99 SPO 1997 10 27 22 18 61 2.4 -9 672.30 -55.3 -53.6 -53.7 69 -99 SPO 1997 10 27 22 19 63 2.6 -9 672.30 -55.3 -53.6 -53.8 69 -99 SPO 1997 10 27 22 20 64 2.6 -9 672.20 -55.2 -53.4 -53.7 69 -99 SPO 1997 10 27 22 21 65 2.7 -9 672.20 -55.2 -53.4 -53.7 69 -99 SPO 1997 10 27 22 22 67 2.8 -9 672.20 -55.4 -53.3 -53.6 70 -99 SPO 1997 10 27 22 23 66 2.9 -9 672.20 -55.4 -53.3 -53.5 70 -99 SPO 1997 10 27 22 24 66 2.9 -9 672.20 -55.6 -53.3 -53.4 70 -99 SPO 1997 10 27 22 25 65 2.9 -9 672.20 -55.7 -53.3 -53.4 70 -99 SPO 1997 10 27 22 26 66 3.0 -9 672.20 -55.8 -53.3 -53.5 70 -99 SPO 1997 10 27 22 27 67 3.1 -9 672.30 -55.9 -53.4 -53.6 69 -99 SPO 1997 10 27 22 28 66 3.1 -9 672.20 -56.0 -53.2 -53.7 69 -99 SPO 1997 10 27 22 29 65 3.0 -9 672.20 -55.8 -53.2 -53.8 68 -99 SPO 1997 10 27 22 30 64 3.1 -9 672.20 -55.8 -53.1 -54.0 68 -99 SPO 1997 10 27 22 31 63 3.2 -9 672.20 -55.8 -53.1 -54.1 67 -99 SPO 1997 10 27 22 32 63 3.3 -9 672.30 -55.6 -53.0 -54.3 65 -99 SPO 1997 10 27 22 33 63 3.5 -9 672.30 -55.5 -52.8 -54.3 65 -99 SPO 1997 10 27 22 34 60 3.4 -9 672.30 -55.5 -52.8 -54.3 66 -99 SPO 1997 10 27 22 35 59 3.5 -9 672.30 -55.5 -52.9 -54.4 66 -99 SPO 1997 10 27 22 36 60 3.5 -9 672.20 -55.6 -52.8 -54.4 68 -99 SPO 1997 10 27 22 37 61 3.5 -9 672.20 -55.5 -52.9 -54.5 68 -99 SPO 1997 10 27 22 38 60 3.4 -9 672.20 -55.5 -52.9 -54.5 69 -99 SPO 1997 10 27 22 39 65 3.6 -9 672.20 -55.5 -53.0 -54.6 69 -99 SPO 1997 10 27 22 40 61 3.2 -9 672.20 -55.4 -53.0 -54.6 67 -99 SPO 1997 10 27 22 41 60 3.0 -9 672.30 -55.5 -53.0 -54.6 69 -99 SPO 1997 10 27 22 42 60 2.8 -9 672.30 -55.6 -53.0 -54.7 70 -99 SPO 1997 10 27 22 43 58 2.8 -9 672.30 -55.7 -53.1 -54.7 70 -99 SPO 1997 10 27 22 44 61 3.1 -9 672.30 -55.6 -53.1 -54.7 69 -99 SPO 1997 10 27 22 45 64 3.1 -9 672.30 -55.6 -53.0 -54.7 69 -99 SPO 1997 10 27 22 46 61 3.1 -9 672.30 -55.7 -53.0 -54.7 70 -99 SPO 1997 10 27 22 47 62 3.6 -9 672.30 -55.7 -53.0 -54.7 69 -99 SPO 1997 10 27 22 48 65 3.9 -9 672.20 -55.6 -52.8 -54.7 68 -99 SPO 1997 10 27 22 49 65 3.9 -9 672.20 -55.6 -52.8 -54.7 67 -99 SPO 1997 10 27 22 50 64 3.9 -9 672.20 -55.6 -52.8 -54.7 67 -99 SPO 1997 10 27 22 51 63 3.8 -9 672.20 -55.6 -52.8 -54.7 67 -99 SPO 1997 10 27 22 52 62 3.9 -9 672.20 -55.6 -52.8 -54.8 67 -99 SPO 1997 10 27 22 53 59 3.9 -9 672.20 -55.6 -52.8 -54.7 67 -99 SPO 1997 10 27 22 54 59 4.0 -9 672.20 -55.5 -52.9 -54.7 66 -99 SPO 1997 10 27 22 55 57 4.0 -9 672.20 -55.4 -52.9 -54.7 66 -99 SPO 1997 10 27 22 56 56 4.2 -9 672.20 -55.4 -52.9 -54.6 66 -99 SPO 1997 10 27 22 57 57 4.3 -9 672.20 -55.3 -52.7 -54.6 66 -99 SPO 1997 10 27 22 58 55 4.5 -9 672.20 -55.3 -52.6 -54.6 67 -99 SPO 1997 10 27 22 59 54 4.4 -9 672.20 -55.2 -52.3 -54.6 66 -99 SPO 1997 10 27 23 00 55 4.5 -9 672.20 -55.2 -52.3 -54.5 66 0 SPO 1997 10 27 23 01 55 4.7 -9 672.20 -55.1 -52.2 -54.5 66 -99 SPO 1997 10 27 23 02 57 4.7 -9 672.20 -55.1 -52.2 -54.4 66 -99 SPO 1997 10 27 23 03 58 4.9 -9 672.20 -55.0 -51.9 -54.4 65 -99 SPO 1997 10 27 23 04 57 4.8 -9 672.20 -55.0 -51.8 -54.4 66 -99 SPO 1997 10 27 23 05 58 5.0 -9 672.20 -54.9 -51.8 -54.4 65 -99 SPO 1997 10 27 23 06 59 5.0 -9 672.20 -54.9 -51.7 -54.4 66 -99 SPO 1997 10 27 23 07 57 5.0 -9 672.20 -54.9 -51.5 -54.3 66 -99 SPO 1997 10 27 23 08 58 5.1 -9 672.20 -54.8 -51.5 -54.3 66 -99 SPO 1997 10 27 23 09 57 5.1 -9 672.20 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 27 23 10 57 5.2 -9 672.20 -54.8 -51.2 -54.3 67 -99 SPO 1997 10 27 23 11 58 5.2 -9 672.20 -54.7 -51.0 -54.2 66 -99 SPO 1997 10 27 23 12 57 5.1 -9 672.20 -54.7 -51.1 -54.2 66 -99 SPO 1997 10 27 23 13 54 4.7 -9 672.20 -54.8 -51.4 -54.2 66 -99 SPO 1997 10 27 23 14 54 4.6 -9 672.20 -54.8 -51.7 -54.2 66 -99 SPO 1997 10 27 23 15 55 4.8 -9 672.20 -54.8 -51.8 -54.2 66 -99 SPO 1997 10 27 23 16 56 4.7 -9 672.20 -54.8 -51.8 -54.2 66 -99 SPO 1997 10 27 23 17 56 4.8 -9 672.20 -54.8 -51.7 -54.2 66 -99 SPO 1997 10 27 23 18 56 4.7 -9 672.20 -54.8 -51.8 -54.2 66 -99 SPO 1997 10 27 23 19 59 4.9 -9 672.20 -54.8 -51.8 -54.2 66 -99 SPO 1997 10 27 23 20 58 4.8 -9 672.10 -54.8 -51.7 -54.2 66 -99 SPO 1997 10 27 23 21 60 5.0 -9 672.10 -54.8 -51.6 -54.3 66 -99 SPO 1997 10 27 23 22 60 4.9 -9 672.10 -54.8 -51.7 -54.3 66 -99 SPO 1997 10 27 23 23 59 4.9 -9 672.10 -54.9 -51.8 -54.4 67 -99 SPO 1997 10 27 23 24 59 4.7 -9 672.10 -54.9 -51.8 -54.4 67 -99 SPO 1997 10 27 23 25 59 5.0 -9 672.10 -54.8 -51.9 -54.4 66 -99 SPO 1997 10 27 23 26 58 5.2 -9 672.10 -54.8 -52.0 -54.4 66 -99 SPO 1997 10 27 23 27 59 5.0 -9 672.10 -54.7 -52.0 -54.4 66 -99 SPO 1997 10 27 23 28 58 5.0 -9 672.10 -54.6 -52.1 -54.4 64 -99 SPO 1997 10 27 23 29 59 4.8 -9 672.10 -54.6 -52.2 -54.4 64 -99 SPO 1997 10 27 23 30 61 4.8 -9 672.10 -54.7 -52.2 -54.5 65 -99 SPO 1997 10 27 23 31 62 4.8 -9 672.10 -54.8 -52.2 -54.5 66 -99 SPO 1997 10 27 23 32 61 4.6 -9 672.10 -54.9 -52.3 -54.6 66 -99 SPO 1997 10 27 23 33 60 4.5 -9 672.10 -54.9 -52.4 -54.6 66 -99 SPO 1997 10 27 23 34 58 4.3 -9 672.10 -54.9 -52.4 -54.5 66 -99 SPO 1997 10 27 23 35 58 4.2 -9 672.20 -55.0 -52.5 -54.5 67 -99 SPO 1997 10 27 23 36 57 4.3 -9 672.20 -54.9 -52.5 -54.5 66 -99 SPO 1997 10 27 23 37 57 4.2 -9 672.20 -54.9 -52.6 -54.4 66 -99 SPO 1997 10 27 23 38 56 4.0 -9 672.20 -54.9 -52.6 -54.4 66 -99 SPO 1997 10 27 23 39 54 4.0 -9 672.20 -54.9 -52.6 -54.4 66 -99 SPO 1997 10 27 23 40 56 4.0 -9 672.20 -54.9 -52.6 -54.4 66 -99 SPO 1997 10 27 23 41 57 3.9 -9 672.20 -55.0 -52.7 -54.4 66 -99 SPO 1997 10 27 23 42 57 3.9 -9 672.20 -55.0 -52.6 -54.4 66 -99 SPO 1997 10 27 23 43 57 3.9 -9 672.20 -55.0 -52.6 -54.4 66 -99 SPO 1997 10 27 23 44 57 3.9 -9 672.20 -55.0 -52.7 -54.4 66 -99 SPO 1997 10 27 23 45 58 3.8 -9 672.20 -55.0 -52.6 -54.4 66 -99 SPO 1997 10 27 23 46 57 3.8 -9 672.20 -55.1 -52.7 -54.4 67 -99 SPO 1997 10 27 23 47 57 3.8 -9 672.20 -55.1 -52.7 -54.4 67 -99 SPO 1997 10 27 23 48 54 3.6 -9 672.20 -55.1 -52.8 -54.4 67 -99 SPO 1997 10 27 23 49 52 3.6 -9 672.20 -55.1 -52.8 -54.3 67 -99 SPO 1997 10 27 23 50 50 3.4 -9 672.20 -55.1 -53.0 -54.2 67 -99 SPO 1997 10 27 23 51 52 3.6 -9 672.20 -55.0 -53.1 -54.2 66 -99 SPO 1997 10 27 23 52 51 3.4 -9 672.20 -55.0 -53.0 -54.2 66 -99 SPO 1997 10 27 23 53 52 3.5 -9 672.20 -55.0 -53.0 -54.1 66 -99 SPO 1997 10 27 23 54 49 3.8 -9 672.20 -54.9 -52.9 -54.1 66 -99 SPO 1997 10 27 23 55 50 3.6 -9 672.30 -54.8 -52.8 -54.0 65 -99 SPO 1997 10 27 23 56 51 4.0 -9 672.30 -54.8 -52.8 -54.0 66 -99 SPO 1997 10 27 23 57 53 4.0 -9 672.20 -54.8 -52.6 -54.0 66 -99 SPO 1997 10 27 23 58 51 3.9 -9 672.20 -54.9 -52.7 -54.1 -99 -99 SPO 1997 10 27 23 59 52 4.4 -9 672.20 -54.9 -52.7 -54.1 -99 -99 SPO 1997 10 28 00 00 55 4.8 -9 672.20 -54.7 -52.3 -54.0 -99 0 SPO 1997 10 28 00 01 56 4.7 -9 672.20 -54.7 -52.1 -54.1 -99 -99 SPO 1997 10 28 00 02 55 4.5 -9 672.20 -54.7 -52.0 -54.1 -99 -99 SPO 1997 10 28 00 03 54 4.0 -9 672.20 -54.9 -52.2 -54.2 68 -99 SPO 1997 10 28 00 04 55 4.1 -9 672.20 -54.9 -52.4 -54.2 67 -99 SPO 1997 10 28 00 05 57 4.1 -9 672.20 -54.9 -52.5 -54.2 66 -99 SPO 1997 10 28 00 06 59 4.1 -9 672.20 -54.9 -52.4 -54.2 66 -99 SPO 1997 10 28 00 07 58 3.8 -9 672.20 -55.0 -52.5 -54.2 66 -99 SPO 1997 10 28 00 08 58 3.8 -9 672.20 -55.0 -52.6 -54.2 66 -99 SPO 1997 10 28 00 09 60 3.8 -9 672.20 -55.0 -52.8 -54.2 66 -99 SPO 1997 10 28 00 10 61 3.7 -9 672.20 -55.0 -52.8 -54.2 66 -99 SPO 1997 10 28 00 11 62 3.9 -9 672.20 -55.0 -52.8 -54.2 66 -99 SPO 1997 10 28 00 12 61 3.8 -9 672.20 -55.2 -52.7 -54.2 67 -99 SPO 1997 10 28 00 13 61 3.7 -9 672.20 -55.2 -52.8 -54.2 67 -99 SPO 1997 10 28 00 14 61 3.6 -9 672.20 -55.2 -52.8 -54.2 67 -99 SPO 1997 10 28 00 15 62 3.8 -9 672.20 -55.2 -52.8 -54.2 67 -99 SPO 1997 10 28 00 16 61 3.9 -9 672.20 -55.2 -52.7 -54.2 67 -99 SPO 1997 10 28 00 17 62 3.8 -9 672.20 -55.2 -52.6 -54.2 67 -99 SPO 1997 10 28 00 18 61 3.8 -9 672.20 -55.2 -52.7 -54.3 67 -99 SPO 1997 10 28 00 19 62 3.6 -9 672.20 -55.2 -52.9 -54.3 67 -99 SPO 1997 10 28 00 20 63 3.8 -9 672.20 -55.2 -53.0 -54.4 66 -99 SPO 1997 10 28 00 21 63 3.9 -9 672.20 -55.2 -53.0 -54.4 66 -99 SPO 1997 10 28 00 22 62 4.0 -9 672.20 -55.2 -52.9 -54.4 66 -99 SPO 1997 10 28 00 23 61 3.8 -9 672.20 -55.2 -53.0 -54.4 65 -99 SPO 1997 10 28 00 24 61 4.1 -9 672.20 -55.2 -53.0 -54.4 65 -99 SPO 1997 10 28 00 25 60 3.9 -9 672.20 -55.2 -52.8 -54.4 65 -99 SPO 1997 10 28 00 26 60 4.1 -9 672.20 -55.2 -53.0 -54.5 65 -99 SPO 1997 10 28 00 27 60 4.2 -9 672.20 -55.2 -53.0 -54.5 65 -99 SPO 1997 10 28 00 28 60 4.3 -9 672.20 -55.2 -52.9 -54.6 66 -99 SPO 1997 10 28 00 29 61 4.1 -9 672.20 -55.2 -52.9 -54.6 66 -99 SPO 1997 10 28 00 30 61 4.1 -9 672.20 -55.2 -52.8 -54.5 66 -99 SPO 1997 10 28 00 31 61 4.2 -9 672.20 -55.2 -52.8 -54.6 66 -99 SPO 1997 10 28 00 32 61 4.2 -9 672.20 -55.2 -52.7 -54.6 66 -99 SPO 1997 10 28 00 33 59 4.0 -9 672.20 -55.2 -52.7 -54.6 66 -99 SPO 1997 10 28 00 34 60 4.1 -9 672.20 -55.2 -52.6 -54.7 66 -99 SPO 1997 10 28 00 35 59 4.4 -9 672.20 -55.2 -52.5 -54.7 66 -99 SPO 1997 10 28 00 36 57 4.0 -9 672.20 -55.2 -52.4 -54.7 66 -99 SPO 1997 10 28 00 37 59 4.2 -9 672.20 -55.2 -52.5 -54.7 65 -99 SPO 1997 10 28 00 38 60 3.9 -9 672.20 -55.2 -52.4 -54.7 65 -99 SPO 1997 10 28 00 39 59 4.7 -9 672.20 -55.2 -52.2 -54.7 66 -99 SPO 1997 10 28 00 40 59 4.3 -9 672.20 -55.0 -52.0 -54.7 64 -99 SPO 1997 10 28 00 41 58 4.5 -9 672.20 -55.0 -52.0 -54.8 64 -99 SPO 1997 10 28 00 42 59 4.1 -9 672.20 -55.2 -52.1 -54.8 66 -99 SPO 1997 10 28 00 43 58 4.4 -9 672.20 -55.2 -52.0 -54.8 66 -99 SPO 1997 10 28 00 44 58 4.5 -9 672.20 -55.2 -51.9 -54.7 66 -99 SPO 1997 10 28 00 45 59 4.3 -9 672.20 -55.0 -51.9 -54.7 64 -99 SPO 1997 10 28 00 46 60 4.3 -9 672.20 -55.0 -52.0 -54.6 65 -99 SPO 1997 10 28 00 47 61 4.2 -9 672.20 -55.0 -52.0 -54.6 65 -99 SPO 1997 10 28 00 48 62 4.3 -9 672.20 -55.2 -52.2 -54.6 67 -99 SPO 1997 10 28 00 49 62 4.5 -9 672.20 -55.0 -52.0 -54.5 66 -99 SPO 1997 10 28 00 50 63 4.2 -9 672.20 -55.0 -52.1 -54.5 66 -99 SPO 1997 10 28 00 51 63 4.6 -9 672.20 -55.0 -52.0 -54.5 66 -99 SPO 1997 10 28 00 52 64 4.6 -9 672.20 -55.0 -51.9 -54.5 66 -99 SPO 1997 10 28 00 53 64 4.4 -9 672.10 -55.0 -51.9 -54.5 66 -99 SPO 1997 10 28 00 54 64 4.5 -9 672.10 -55.0 -51.9 -54.5 66 -99 SPO 1997 10 28 00 55 64 4.4 -9 672.10 -55.0 -51.9 -54.5 66 -99 SPO 1997 10 28 00 56 63 4.5 -9 672.10 -55.0 -51.8 -54.5 66 -99 SPO 1997 10 28 00 57 63 4.3 -9 672.10 -55.0 -51.8 -54.4 66 -99 SPO 1997 10 28 00 58 64 4.3 -9 672.10 -55.0 -51.8 -54.5 66 -99 SPO 1997 10 28 00 59 63 4.2 -9 672.10 -55.0 -51.8 -54.4 66 -99 SPO 1997 10 28 01 00 65 4.0 -9 672.10 -55.0 -51.7 -54.4 66 0 SPO 1997 10 28 01 01 67 3.8 -9 672.10 -55.0 -51.8 -54.3 66 -99 SPO 1997 10 28 01 02 68 3.6 -9 672.10 -55.0 -52.0 -54.3 66 -99 SPO 1997 10 28 01 03 69 3.7 -9 672.10 -55.2 -52.0 -54.2 66 -99 SPO 1997 10 28 01 04 70 3.6 -9 672.10 -55.0 -52.0 -54.0 63 -99 SPO 1997 10 28 01 05 72 3.3 -9 672.10 -55.2 -52.2 -54.0 65 -99 SPO 1997 10 28 01 06 72 3.6 -9 672.10 -55.2 -52.3 -53.9 64 -99 SPO 1997 10 28 01 07 73 3.7 -9 672.10 -55.2 -52.3 -53.9 64 -99 SPO 1997 10 28 01 08 73 3.8 -9 672.10 -55.2 -52.4 -53.9 65 -99 SPO 1997 10 28 01 09 73 3.8 -9 672.10 -55.2 -52.4 -54.0 66 -99 SPO 1997 10 28 01 10 73 3.8 -9 672.10 -55.4 -52.5 -54.1 67 -99 SPO 1997 10 28 01 11 74 3.8 -9 672.10 -55.4 -52.4 -54.1 67 -99 SPO 1997 10 28 01 12 74 3.8 -9 672.10 -55.4 -52.4 -54.1 67 -99 SPO 1997 10 28 01 13 72 3.9 -9 672.10 -55.5 -52.4 -54.2 67 -99 SPO 1997 10 28 01 14 71 3.9 -9 672.10 -55.5 -52.5 -54.4 67 -99 SPO 1997 10 28 01 15 70 4.2 -9 672.10 -55.4 -52.5 -54.4 66 -99 SPO 1997 10 28 01 16 69 4.2 -9 672.10 -55.2 -52.3 -54.5 65 -99 SPO 1997 10 28 01 17 68 4.2 -9 672.10 -55.2 -52.3 -54.5 65 -99 SPO 1997 10 28 01 18 67 4.3 -9 672.10 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 28 01 19 67 4.4 -9 672.10 -55.2 -52.1 -54.5 65 -99 SPO 1997 10 28 01 20 67 4.2 -9 672.10 -55.2 -52.0 -54.5 65 -99 SPO 1997 10 28 01 21 69 4.2 -9 672.10 -55.2 -52.0 -54.4 65 -99 SPO 1997 10 28 01 22 70 4.1 -9 672.10 -55.2 -52.2 -54.4 65 -99 SPO 1997 10 28 01 23 71 4.0 -9 672.10 -55.2 -52.3 -54.3 65 -99 SPO 1997 10 28 01 24 71 4.0 -9 672.10 -55.2 -52.3 -54.2 65 -99 SPO 1997 10 28 01 25 72 4.0 -9 672.10 -55.2 -52.3 -54.2 65 -99 SPO 1997 10 28 01 26 72 4.0 -9 672.10 -55.2 -52.4 -54.2 65 -99 SPO 1997 10 28 01 27 72 4.0 -9 672.10 -55.2 -52.4 -54.2 66 -99 SPO 1997 10 28 01 28 72 4.1 -9 672.00 -55.2 -52.5 -54.3 66 -99 SPO 1997 10 28 01 29 71 4.2 -9 672.00 -55.2 -52.4 -54.3 66 -99 SPO 1997 10 28 01 30 70 4.3 -9 672.00 -55.2 -52.4 -54.4 66 -99 SPO 1997 10 28 01 31 70 4.3 -9 672.00 -55.2 -52.4 -54.4 66 -99 SPO 1997 10 28 01 32 70 4.2 -9 672.00 -55.2 -52.4 -54.4 66 -99 SPO 1997 10 28 01 33 70 4.2 -9 672.00 -55.2 -52.4 -54.4 66 -99 SPO 1997 10 28 01 34 72 4.3 -9 672.00 -55.2 -52.4 -54.5 66 -99 SPO 1997 10 28 01 35 73 4.3 -9 672.00 -55.2 -52.4 -54.5 65 -99 SPO 1997 10 28 01 36 72 4.2 -9 672.00 -55.2 -52.4 -54.4 64 -99 SPO 1997 10 28 01 37 72 4.3 -9 672.00 -55.2 -52.3 -54.4 64 -99 SPO 1997 10 28 01 38 72 4.3 -9 672.00 -55.2 -52.2 -54.4 64 -99 SPO 1997 10 28 01 39 71 4.3 -9 672.00 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 28 01 40 71 4.2 -9 672.00 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 28 01 41 69 4.2 -9 672.00 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 28 01 42 69 4.3 -9 672.00 -55.2 -52.2 -54.6 65 -99 SPO 1997 10 28 01 43 68 4.5 -9 672.00 -55.4 -52.2 -54.7 66 -99 SPO 1997 10 28 01 44 68 4.4 -9 671.90 -55.4 -52.1 -54.7 65 -99 SPO 1997 10 28 01 45 68 4.3 -9 671.90 -55.4 -52.2 -54.7 65 -99 SPO 1997 10 28 01 46 68 4.4 -9 671.90 -55.4 -52.0 -54.7 65 -99 SPO 1997 10 28 01 47 70 4.5 -9 671.90 -55.4 -52.0 -54.7 65 -99 SPO 1997 10 28 01 48 69 4.4 -9 671.90 -55.4 -52.0 -54.6 65 -99 SPO 1997 10 28 01 49 69 4.4 -9 671.90 -55.4 -52.1 -54.6 65 -99 SPO 1997 10 28 01 50 67 4.4 -9 671.90 -55.4 -52.1 -54.7 65 -99 SPO 1997 10 28 01 51 66 4.4 -9 671.90 -55.2 -52.1 -54.7 63 -99 SPO 1997 10 28 01 52 65 4.4 -9 671.90 -55.4 -52.0 -54.8 65 -99 SPO 1997 10 28 01 53 64 4.5 -9 671.80 -55.5 -52.0 -54.9 65 -99 SPO 1997 10 28 01 54 63 4.5 -9 671.80 -55.5 -52.0 -54.9 65 -99 SPO 1997 10 28 01 55 62 4.6 -9 671.80 -55.5 -51.8 -54.9 65 -99 SPO 1997 10 28 01 56 62 4.7 -9 671.80 -55.5 -51.8 -54.9 65 -99 SPO 1997 10 28 01 57 61 4.7 -9 671.80 -55.4 -51.6 -54.8 65 -99 SPO 1997 10 28 01 58 61 4.8 -9 671.80 -55.2 -51.5 -54.7 64 -99 SPO 1997 10 28 01 59 62 4.9 -9 671.80 -55.2 -51.4 -54.7 65 -99 SPO 1997 10 28 02 00 61 4.9 -9 671.80 -55.2 -51.4 -54.6 66 0 SPO 1997 10 28 02 01 62 4.8 -9 671.80 -55.2 -51.4 -54.6 66 -99 SPO 1997 10 28 02 02 62 4.8 -9 671.80 -55.0 -51.4 -54.5 64 -99 SPO 1997 10 28 02 03 63 4.9 -9 671.80 -55.0 -51.4 -54.4 64 -99 SPO 1997 10 28 02 04 64 4.9 -9 671.80 -54.9 -51.4 -54.4 63 -99 SPO 1997 10 28 02 05 64 4.6 -9 671.80 -54.9 -51.4 -54.3 64 -99 SPO 1997 10 28 02 06 64 4.5 -9 671.80 -54.7 -51.5 -54.3 63 -99 SPO 1997 10 28 02 07 63 4.7 -9 671.80 -54.7 -51.6 -54.2 64 -99 SPO 1997 10 28 02 08 62 4.7 -9 671.80 -54.7 -51.5 -54.2 65 -99 SPO 1997 10 28 02 09 62 4.7 -9 671.80 -54.7 -51.5 -54.2 65 -99 SPO 1997 10 28 02 10 61 4.9 -9 671.70 -54.7 -51.4 -54.2 65 -99 SPO 1997 10 28 02 11 61 5.0 -9 671.70 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 02 12 61 5.1 -9 671.70 -54.5 -51.2 -54.1 65 -99 SPO 1997 10 28 02 13 61 5.0 -9 671.70 -54.5 -51.0 -54.1 65 -99 SPO 1997 10 28 02 14 62 5.0 -9 671.60 -54.5 -50.8 -54.0 65 -99 SPO 1997 10 28 02 15 61 5.0 -9 671.60 -54.5 -50.8 -54.0 65 -99 SPO 1997 10 28 02 16 60 4.9 -9 671.60 -54.5 -50.9 -54.0 65 -99 SPO 1997 10 28 02 17 61 5.0 -9 671.60 -54.5 -50.9 -54.0 65 -99 SPO 1997 10 28 02 18 61 5.1 -9 671.60 -54.5 -51.1 -54.0 65 -99 SPO 1997 10 28 02 19 61 5.0 -9 671.60 -54.5 -51.1 -54.0 65 -99 SPO 1997 10 28 02 20 61 4.9 -9 671.60 -54.5 -51.2 -54.0 66 -99 SPO 1997 10 28 02 21 61 5.0 -9 671.60 -54.5 -51.0 -54.1 66 -99 SPO 1997 10 28 02 22 60 5.1 -9 671.60 -54.5 -50.9 -54.1 66 -99 SPO 1997 10 28 02 23 60 5.0 -9 671.70 -54.5 -50.7 -54.1 66 -99 SPO 1997 10 28 02 24 59 5.0 -9 671.70 -54.5 -50.7 -54.0 66 -99 SPO 1997 10 28 02 25 59 5.1 -9 671.70 -54.5 -50.6 -54.0 66 -99 SPO 1997 10 28 02 26 60 5.1 -9 671.60 -54.5 -50.3 -54.0 66 -99 SPO 1997 10 28 02 27 60 5.0 -9 671.70 -54.5 -50.1 -54.0 66 -99 SPO 1997 10 28 02 28 60 4.9 -9 671.70 -54.5 -50.4 -53.9 65 -99 SPO 1997 10 28 02 29 61 5.0 -9 671.70 -54.5 -50.3 -53.9 65 -99 SPO 1997 10 28 02 30 61 4.9 -9 671.70 -54.4 -50.2 -53.9 64 -99 SPO 1997 10 28 02 31 61 4.9 -9 671.60 -54.4 -50.1 -53.9 63 -99 SPO 1997 10 28 02 32 60 4.8 -9 671.60 -54.4 -50.0 -53.8 64 -99 SPO 1997 10 28 02 33 60 5.0 -9 671.60 -54.4 -50.3 -53.8 64 -99 SPO 1997 10 28 02 34 61 5.0 -9 671.60 -54.4 -50.1 -53.9 66 -99 SPO 1997 10 28 02 35 60 5.0 -9 671.60 -54.4 -50.0 -53.9 66 -99 SPO 1997 10 28 02 36 60 5.0 -9 671.60 -54.4 -50.2 -53.9 67 -99 SPO 1997 10 28 02 37 60 5.0 -9 671.60 -54.4 -50.4 -53.9 67 -99 SPO 1997 10 28 02 38 59 5.1 -9 671.60 -54.4 -50.2 -53.9 67 -99 SPO 1997 10 28 02 39 58 5.2 -9 671.60 -54.5 -49.9 -53.9 67 -99 SPO 1997 10 28 02 40 58 5.2 -9 671.60 -54.4 -49.6 -53.9 67 -99 SPO 1997 10 28 02 41 57 5.3 -9 671.60 -54.4 -49.2 -53.9 67 -99 SPO 1997 10 28 02 42 57 5.3 -9 671.60 -54.4 -48.9 -53.9 66 -99 SPO 1997 10 28 02 43 56 5.4 -9 671.60 -54.4 -48.4 -53.8 66 -99 SPO 1997 10 28 02 44 55 5.5 -9 671.60 -54.4 -48.0 -53.8 66 -99 SPO 1997 10 28 02 45 55 5.6 -9 671.60 -54.4 -47.7 -53.8 66 -99 SPO 1997 10 28 02 46 55 5.6 -9 671.60 -54.2 -47.6 -53.8 65 -99 SPO 1997 10 28 02 47 55 5.5 -9 671.60 -54.4 -47.8 -53.8 67 -99 SPO 1997 10 28 02 48 54 5.4 -9 671.60 -54.2 -48.4 -53.8 65 -99 SPO 1997 10 28 02 49 54 5.6 -9 671.60 -54.2 -48.8 -53.8 65 -99 SPO 1997 10 28 02 50 55 5.4 -9 671.60 -54.2 -49.0 -53.8 65 -99 SPO 1997 10 28 02 51 56 5.4 -9 671.60 -54.2 -49.0 -53.8 66 -99 SPO 1997 10 28 02 52 56 5.2 -9 671.60 -54.2 -49.0 -53.8 66 -99 SPO 1997 10 28 02 53 56 5.2 -9 671.60 -54.4 -49.3 -53.9 67 -99 SPO 1997 10 28 02 54 58 5.2 -9 671.60 -54.4 -49.5 -53.9 67 -99 SPO 1997 10 28 02 55 57 5.1 -9 671.50 -54.4 -49.6 -53.9 67 -99 SPO 1997 10 28 02 56 57 5.1 -9 671.50 -54.4 -49.8 -54.0 66 -99 SPO 1997 10 28 02 57 57 5.2 -9 671.50 -54.4 -49.7 -54.0 64 -99 SPO 1997 10 28 02 58 57 5.1 -9 671.50 -54.5 -49.8 -54.0 66 -99 SPO 1997 10 28 02 59 57 5.2 -9 671.50 -54.5 -49.8 -54.0 66 -99 SPO 1997 10 28 03 00 57 5.3 -9 671.50 -54.4 -49.4 -54.0 66 0 SPO 1997 10 28 03 01 58 5.4 -9 671.50 -54.5 -49.3 -54.0 66 -99 SPO 1997 10 28 03 02 58 5.4 -9 671.50 -54.4 -49.2 -54.0 66 -99 SPO 1997 10 28 03 03 58 5.6 -9 671.50 -54.4 -49.0 -53.9 66 -99 SPO 1997 10 28 03 04 57 5.5 -9 671.50 -54.4 -49.1 -53.9 64 -99 SPO 1997 10 28 03 05 57 5.4 -9 671.50 -54.2 -49.1 -53.9 63 -99 SPO 1997 10 28 03 06 57 5.2 -9 671.60 -54.4 -49.0 -53.9 66 -99 SPO 1997 10 28 03 07 58 5.3 -9 671.60 -54.4 -49.1 -53.9 66 -99 SPO 1997 10 28 03 08 58 5.3 -9 671.50 -54.4 -49.2 -53.9 66 -99 SPO 1997 10 28 03 09 57 5.4 -9 671.50 -54.2 -49.2 -53.8 64 -99 SPO 1997 10 28 03 10 58 5.4 -9 671.50 -54.2 -49.1 -53.8 64 -99 SPO 1997 10 28 03 11 58 5.4 -9 671.50 -54.2 -49.0 -53.8 65 -99 SPO 1997 10 28 03 12 59 5.4 -9 671.50 -54.2 -49.1 -53.8 66 -99 SPO 1997 10 28 03 13 60 5.2 -9 671.50 -54.2 -49.4 -53.8 66 -99 SPO 1997 10 28 03 14 58 4.9 -9 671.60 -54.2 -49.7 -53.8 66 -99 SPO 1997 10 28 03 15 57 4.7 -9 671.60 -54.4 -49.8 -53.8 67 -99 SPO 1997 10 28 03 16 60 4.8 -9 671.60 -54.4 -50.1 -53.8 67 -99 SPO 1997 10 28 03 17 61 4.8 -9 671.60 -54.4 -50.1 -53.8 67 -99 SPO 1997 10 28 03 18 63 4.9 -9 671.60 -54.4 -50.1 -53.8 67 -99 SPO 1997 10 28 03 19 62 4.8 -9 671.50 -54.4 -50.0 -53.8 67 -99 SPO 1997 10 28 03 20 61 5.1 -9 671.50 -54.2 -49.6 -53.8 64 -99 SPO 1997 10 28 03 21 61 5.4 -9 671.50 -54.2 -48.6 -53.8 64 -99 SPO 1997 10 28 03 22 61 5.2 -9 671.50 -54.2 -48.2 -53.8 65 -99 SPO 1997 10 28 03 23 62 5.1 -9 671.50 -54.2 -48.6 -53.8 65 -99 SPO 1997 10 28 03 24 62 5.0 -9 671.50 -54.4 -49.2 -53.8 67 -99 SPO 1997 10 28 03 25 63 5.0 -9 671.50 -54.4 -49.4 -53.9 67 -99 SPO 1997 10 28 03 26 63 5.0 -9 671.50 -54.5 -49.5 -54.0 68 -99 SPO 1997 10 28 03 27 65 5.0 -9 671.50 -54.5 -49.7 -54.0 67 -99 SPO 1997 10 28 03 28 66 5.0 -9 671.50 -54.5 -50.0 -53.9 67 -99 SPO 1997 10 28 03 29 67 4.8 -9 671.60 -54.5 -50.1 -54.0 67 -99 SPO 1997 10 28 03 30 68 4.9 -9 671.60 -54.5 -50.2 -54.0 67 -99 SPO 1997 10 28 03 31 68 4.9 -9 671.60 -54.5 -50.2 -54.0 66 -99 SPO 1997 10 28 03 32 68 4.9 -9 671.60 -54.5 -50.1 -54.0 65 -99 SPO 1997 10 28 03 33 69 4.9 -9 671.60 -54.7 -50.1 -54.1 66 -99 SPO 1997 10 28 03 34 68 4.8 -9 671.60 -54.5 -50.2 -54.1 63 -99 SPO 1997 10 28 03 35 68 4.7 -9 671.60 -54.7 -50.4 -54.2 66 -99 SPO 1997 10 28 03 36 69 4.6 -9 671.60 -54.7 -50.7 -54.2 65 -99 SPO 1997 10 28 03 37 68 4.8 -9 671.60 -54.7 -50.8 -54.2 65 -99 SPO 1997 10 28 03 38 69 4.7 -9 671.60 -54.9 -50.9 -54.3 66 -99 SPO 1997 10 28 03 39 68 4.8 -9 671.60 -54.9 -50.9 -54.3 66 -99 SPO 1997 10 28 03 40 69 5.0 -9 671.60 -54.9 -50.8 -54.3 66 -99 SPO 1997 10 28 03 41 70 5.1 -9 671.60 -54.9 -50.7 -54.3 66 -99 SPO 1997 10 28 03 42 69 5.1 -9 671.60 -54.7 -50.5 -54.3 64 -99 SPO 1997 10 28 03 43 69 5.1 -9 671.60 -54.7 -50.5 -54.3 64 -99 SPO 1997 10 28 03 44 69 5.0 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 45 70 5.1 -9 671.60 -54.7 -50.6 -54.2 64 -99 SPO 1997 10 28 03 46 69 5.0 -9 671.60 -54.7 -50.7 -54.2 63 -99 SPO 1997 10 28 03 47 69 5.0 -9 671.60 -54.7 -50.6 -54.2 63 -99 SPO 1997 10 28 03 48 68 5.2 -9 671.60 -54.9 -50.6 -54.3 66 -99 SPO 1997 10 28 03 49 67 5.2 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 50 66 5.3 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 51 65 5.2 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 52 66 5.2 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 53 66 5.4 -9 671.60 -54.7 -50.6 -54.3 64 -99 SPO 1997 10 28 03 54 65 5.5 -9 671.60 -54.7 -50.6 -54.2 65 -99 SPO 1997 10 28 03 55 66 5.5 -9 671.60 -54.7 -50.4 -54.2 65 -99 SPO 1997 10 28 03 56 67 5.3 -9 671.60 -54.7 -50.5 -54.2 65 -99 SPO 1997 10 28 03 57 67 5.4 -9 671.60 -54.5 -50.5 -54.2 64 -99 SPO 1997 10 28 03 58 68 5.4 -9 671.60 -54.5 -50.6 -54.1 64 -99 SPO 1997 10 28 03 59 68 5.4 -9 671.60 -54.5 -50.6 -54.1 64 -99 SPO 1997 10 28 04 00 68 5.3 -9 671.60 -54.5 -50.6 -54.1 64 0 SPO 1997 10 28 04 01 68 5.3 -9 671.50 -54.5 -50.6 -54.1 65 -99 SPO 1997 10 28 04 02 68 5.3 -9 671.50 -54.4 -50.6 -54.1 64 -99 SPO 1997 10 28 04 03 69 5.3 -9 671.50 -54.5 -50.5 -54.1 66 -99 SPO 1997 10 28 04 04 69 5.3 -9 671.50 -54.4 -50.4 -54.1 67 -99 SPO 1997 10 28 04 05 69 5.4 -9 671.50 -54.5 -50.5 -54.1 67 -99 SPO 1997 10 28 04 06 69 5.4 -9 671.50 -54.5 -50.4 -54.0 67 -99 SPO 1997 10 28 04 07 69 5.2 -9 671.50 -54.4 -50.4 -54.0 67 -99 SPO 1997 10 28 04 08 68 5.3 -9 671.50 -54.5 -50.6 -54.1 67 -99 SPO 1997 10 28 04 09 67 5.3 -9 671.50 -54.5 -50.6 -54.1 67 -99 SPO 1997 10 28 04 10 67 5.3 -9 671.50 -54.5 -50.6 -54.1 66 -99 SPO 1997 10 28 04 11 68 5.2 -9 671.50 -54.5 -50.8 -54.1 66 -99 SPO 1997 10 28 04 12 68 5.2 -9 671.50 -54.5 -50.8 -54.1 66 -99 SPO 1997 10 28 04 13 69 5.3 -9 671.50 -54.4 -50.8 -54.1 66 -99 SPO 1997 10 28 04 14 68 5.4 -9 671.50 -54.4 -50.7 -54.1 66 -99 SPO 1997 10 28 04 15 67 5.4 -9 671.50 -54.5 -50.6 -54.1 67 -99 SPO 1997 10 28 04 16 66 5.4 -9 671.50 -54.5 -50.4 -54.1 67 -99 SPO 1997 10 28 04 17 65 5.4 -9 671.50 -54.5 -50.0 -54.2 67 -99 SPO 1997 10 28 04 18 65 5.4 -9 671.50 -54.5 -49.8 -54.2 67 -99 SPO 1997 10 28 04 19 65 5.3 -9 671.50 -54.5 -49.9 -54.1 66 -99 SPO 1997 10 28 04 20 66 5.3 -9 671.50 -54.5 -50.0 -54.2 66 -99 SPO 1997 10 28 04 21 66 5.3 -9 671.50 -54.5 -50.0 -54.1 66 -99 SPO 1997 10 28 04 22 66 5.3 -9 671.50 -54.5 -50.0 -54.1 66 -99 SPO 1997 10 28 04 23 67 5.2 -9 671.50 -54.4 -50.1 -54.1 67 -99 SPO 1997 10 28 04 24 68 5.2 -9 671.50 -54.4 -50.1 -54.0 67 -99 SPO 1997 10 28 04 25 67 5.1 -9 671.50 -54.4 -50.2 -54.1 66 -99 SPO 1997 10 28 04 26 67 5.0 -9 671.40 -54.4 -50.2 -54.1 64 -99 SPO 1997 10 28 04 27 65 5.0 -9 671.40 -54.5 -50.3 -54.2 65 -99 SPO 1997 10 28 04 28 65 5.2 -9 671.40 -54.5 -50.3 -54.2 65 -99 SPO 1997 10 28 04 29 65 5.2 -9 671.40 -54.5 -50.3 -54.2 65 -99 SPO 1997 10 28 04 30 66 5.2 -9 671.40 -54.5 -50.3 -54.2 65 -99 SPO 1997 10 28 04 31 66 5.3 -9 671.40 -54.5 -50.4 -54.2 65 -99 SPO 1997 10 28 04 32 65 5.5 -9 671.40 -54.5 -50.3 -54.1 66 -99 SPO 1997 10 28 04 33 65 5.5 -9 671.40 -54.5 -50.2 -54.2 66 -99 SPO 1997 10 28 04 34 65 5.5 -9 671.40 -54.5 -50.1 -54.2 67 -99 SPO 1997 10 28 04 35 65 5.6 -9 671.50 -54.5 -49.8 -54.1 67 -99 SPO 1997 10 28 04 36 65 5.7 -9 671.50 -54.4 -49.6 -54.1 67 -99 SPO 1997 10 28 04 37 67 5.7 -9 671.50 -54.4 -49.8 -54.1 67 -99 SPO 1997 10 28 04 38 68 5.6 -9 671.50 -54.4 -50.1 -54.1 66 -99 SPO 1997 10 28 04 39 70 5.6 -9 671.50 -54.4 -50.3 -54.1 66 -99 SPO 1997 10 28 04 40 69 5.8 -9 671.50 -54.4 -50.2 -54.1 64 -99 SPO 1997 10 28 04 41 68 5.8 -9 671.50 -54.4 -50.2 -54.1 64 -99 SPO 1997 10 28 04 42 67 5.8 -9 671.50 -54.2 -50.2 -54.1 64 -99 SPO 1997 10 28 04 43 66 5.9 -9 671.50 -54.2 -50.2 -54.1 65 -99 SPO 1997 10 28 04 44 66 5.9 -9 671.50 -54.2 -50.1 -54.1 66 -99 SPO 1997 10 28 04 45 66 6.0 -9 671.50 -54.2 -49.9 -54.1 67 -99 SPO 1997 10 28 04 46 66 6.0 -9 671.50 -54.2 -50.0 -54.1 67 -99 SPO 1997 10 28 04 47 66 5.9 -9 671.50 -54.4 -50.0 -54.1 68 -99 SPO 1997 10 28 04 48 67 5.9 -9 671.50 -54.2 -50.2 -54.1 67 -99 SPO 1997 10 28 04 49 68 5.8 -9 671.50 -54.2 -50.4 -54.1 67 -99 SPO 1997 10 28 04 50 67 5.8 -9 671.50 -54.2 -50.5 -54.1 67 -99 SPO 1997 10 28 04 51 66 5.6 -9 671.50 -54.4 -50.6 -54.1 67 -99 SPO 1997 10 28 04 52 66 5.7 -9 671.50 -54.2 -50.7 -54.1 65 -99 SPO 1997 10 28 04 53 67 5.8 -9 671.50 -54.2 -50.6 -54.1 64 -99 SPO 1997 10 28 04 54 67 6.0 -9 671.50 -54.2 -50.4 -54.0 64 -99 SPO 1997 10 28 04 55 67 6.0 -9 671.50 -54.2 -50.3 -54.0 64 -99 SPO 1997 10 28 04 56 67 6.0 -9 671.50 -54.2 -50.3 -54.0 65 -99 SPO 1997 10 28 04 57 67 5.9 -9 671.50 -54.0 -50.3 -53.9 64 -99 SPO 1997 10 28 04 58 68 5.8 -9 671.50 -54.0 -50.3 -53.9 65 -99 SPO 1997 10 28 04 59 68 5.7 -9 671.50 -54.0 -50.3 -53.9 65 -99 SPO 1997 10 28 05 00 68 5.6 -9 671.50 -54.0 -50.3 -53.9 66 0 SPO 1997 10 28 05 01 67 5.6 -9 671.50 -54.0 -50.3 -53.8 66 -99 SPO 1997 10 28 05 02 66 5.6 -9 671.50 -54.0 -50.2 -53.8 66 -99 SPO 1997 10 28 05 03 66 5.5 -9 671.50 -54.0 -50.2 -53.8 66 -99 SPO 1997 10 28 05 04 66 5.3 -9 671.50 -54.0 -50.2 -53.8 66 -99 SPO 1997 10 28 05 05 66 5.1 -9 671.50 -54.0 -50.3 -53.8 65 -99 SPO 1997 10 28 05 06 67 5.1 -9 671.50 -54.0 -50.3 -53.8 65 -99 SPO 1997 10 28 05 07 67 5.2 -9 671.50 -54.0 -50.2 -53.8 65 -99 SPO 1997 10 28 05 08 67 5.2 -9 671.50 -54.0 -50.2 -53.8 65 -99 SPO 1997 10 28 05 09 67 5.1 -9 671.50 -54.0 -50.3 -53.9 65 -99 SPO 1997 10 28 05 10 67 5.0 -9 671.50 -54.2 -50.2 -53.9 67 -99 SPO 1997 10 28 05 11 66 4.9 -9 671.50 -54.2 -50.3 -53.9 67 -99 SPO 1997 10 28 05 12 67 5.0 -9 671.50 -54.2 -50.2 -53.9 67 -99 SPO 1997 10 28 05 13 68 5.1 -9 671.50 -54.2 -50.1 -53.8 67 -99 SPO 1997 10 28 05 14 68 5.1 -9 671.50 -54.2 -50.0 -53.8 67 -99 SPO 1997 10 28 05 15 67 5.2 -9 671.50 -54.2 -49.8 -53.8 67 -99 SPO 1997 10 28 05 16 66 5.3 -9 671.50 -54.2 -49.5 -53.8 67 -99 SPO 1997 10 28 05 17 67 5.3 -9 671.50 -54.0 -49.2 -53.8 65 -99 SPO 1997 10 28 05 18 67 5.3 -9 671.50 -54.2 -49.2 -53.8 67 -99 SPO 1997 10 28 05 19 68 5.3 -9 671.40 -54.2 -49.1 -53.8 67 -99 SPO 1997 10 28 05 20 68 5.4 -9 671.40 -54.2 -49.0 -53.8 67 -99 SPO 1997 10 28 05 21 67 5.4 -9 671.40 -54.2 -49.0 -53.8 67 -99 SPO 1997 10 28 05 22 69 5.2 -9 671.40 -54.2 -49.0 -53.8 66 -99 SPO 1997 10 28 05 23 70 5.1 -9 671.40 -54.2 -49.3 -53.8 66 -99 SPO 1997 10 28 05 24 70 5.1 -9 671.40 -54.2 -49.6 -53.8 67 -99 SPO 1997 10 28 05 25 71 5.2 -9 671.40 -54.2 -49.9 -53.8 67 -99 SPO 1997 10 28 05 26 70 5.2 -9 671.40 -54.2 -50.1 -53.8 67 -99 SPO 1997 10 28 05 27 71 5.2 -9 671.40 -54.0 -50.0 -53.8 66 -99 SPO 1997 10 28 05 28 71 5.1 -9 671.40 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 05 29 71 5.0 -9 671.40 -54.2 -50.1 -53.7 67 -99 SPO 1997 10 28 05 30 71 5.1 -9 671.40 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 05 31 70 5.1 -9 671.40 -54.2 -49.9 -53.7 67 -99 SPO 1997 10 28 05 32 69 5.2 -9 671.40 -54.2 -49.8 -53.7 67 -99 SPO 1997 10 28 05 33 69 5.2 -9 671.40 -54.2 -49.7 -53.8 67 -99 SPO 1997 10 28 05 34 70 5.2 -9 671.40 -54.2 -49.8 -53.8 66 -99 SPO 1997 10 28 05 35 69 5.2 -9 671.40 -54.2 -50.0 -53.8 66 -99 SPO 1997 10 28 05 36 69 5.1 -9 671.40 -54.2 -49.8 -53.8 65 -99 SPO 1997 10 28 05 37 70 5.0 -9 671.40 -54.2 -49.7 -53.8 65 -99 SPO 1997 10 28 05 38 71 5.1 -9 671.40 -54.2 -49.6 -53.8 65 -99 SPO 1997 10 28 05 39 71 5.2 -9 671.40 -54.2 -49.6 -53.7 66 -99 SPO 1997 10 28 05 40 73 5.2 -9 671.40 -54.2 -49.8 -53.7 66 -99 SPO 1997 10 28 05 41 74 5.2 -9 671.40 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 05 42 74 5.2 -9 671.40 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 05 43 75 5.2 -9 671.40 -54.2 -50.1 -53.7 67 -99 SPO 1997 10 28 05 44 75 5.3 -9 671.40 -54.2 -50.2 -53.6 67 -99 SPO 1997 10 28 05 45 77 5.3 -9 671.40 -54.2 -50.4 -53.6 67 -99 SPO 1997 10 28 05 46 78 5.3 -9 671.40 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 47 77 5.3 -9 671.40 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 48 77 5.3 -9 671.30 -54.2 -50.3 -53.5 67 -99 SPO 1997 10 28 05 49 78 5.3 -9 671.30 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 50 77 5.3 -9 671.30 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 51 77 5.3 -9 671.30 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 52 76 5.3 -9 671.30 -54.2 -50.4 -53.5 67 -99 SPO 1997 10 28 05 53 76 5.3 -9 671.30 -54.2 -50.4 -53.6 67 -99 SPO 1997 10 28 05 54 75 5.4 -9 671.30 -54.4 -50.3 -53.7 69 -99 SPO 1997 10 28 05 55 76 5.4 -9 671.30 -54.4 -50.3 -53.7 69 -99 SPO 1997 10 28 05 56 76 5.4 -9 671.30 -54.4 -50.4 -53.7 68 -99 SPO 1997 10 28 05 57 76 5.4 -9 671.30 -54.4 -50.5 -53.7 68 -99 SPO 1997 10 28 05 58 76 5.4 -9 671.30 -54.4 -50.6 -53.7 68 -99 SPO 1997 10 28 05 59 76 5.5 -9 671.30 -54.4 -50.6 -53.7 68 -99 SPO 1997 10 28 06 00 75 5.5 -9 671.30 -54.4 -50.6 -53.8 67 0 SPO 1997 10 28 06 01 76 5.4 -9 671.30 -54.4 -50.5 -53.8 67 -99 SPO 1997 10 28 06 02 76 5.4 -9 671.30 -54.4 -50.5 -53.7 67 -99 SPO 1997 10 28 06 03 77 5.3 -9 671.30 -54.5 -50.5 -53.7 66 -99 SPO 1997 10 28 06 04 77 5.3 -9 671.30 -54.5 -50.4 -53.7 66 -99 SPO 1997 10 28 06 05 78 5.3 -9 671.30 -54.5 -50.5 -53.7 65 -99 SPO 1997 10 28 06 06 79 5.4 -9 671.30 -54.5 -50.4 -53.7 65 -99 SPO 1997 10 28 06 07 78 5.3 -9 671.30 -54.5 -50.4 -53.7 65 -99 SPO 1997 10 28 06 08 79 5.2 -9 671.30 -54.5 -50.4 -53.6 65 -99 SPO 1997 10 28 06 09 79 5.2 -9 671.30 -54.5 -50.5 -53.6 66 -99 SPO 1997 10 28 06 10 78 5.2 -9 671.30 -54.5 -50.6 -53.6 66 -99 SPO 1997 10 28 06 11 78 5.2 -9 671.30 -54.5 -50.5 -53.6 67 -99 SPO 1997 10 28 06 12 78 5.2 -9 671.30 -54.5 -50.5 -53.7 66 -99 SPO 1997 10 28 06 13 79 5.4 -9 671.30 -54.5 -50.6 -53.7 66 -99 SPO 1997 10 28 06 14 79 5.5 -9 671.30 -54.5 -50.6 -53.7 66 -99 SPO 1997 10 28 06 15 78 5.6 -9 671.30 -54.5 -50.6 -53.8 66 -99 SPO 1997 10 28 06 16 77 5.5 -9 671.30 -54.5 -50.4 -53.8 66 -99 SPO 1997 10 28 06 17 76 5.6 -9 671.30 -54.4 -50.4 -53.8 66 -99 SPO 1997 10 28 06 18 76 5.6 -9 671.30 -54.4 -50.4 -53.8 66 -99 SPO 1997 10 28 06 19 76 5.6 -9 671.30 -54.4 -50.4 -53.8 66 -99 SPO 1997 10 28 06 20 76 5.6 -9 671.30 -54.4 -50.4 -53.8 66 -99 SPO 1997 10 28 06 21 76 5.5 -9 671.30 -54.4 -50.3 -53.8 67 -99 SPO 1997 10 28 06 22 75 5.5 -9 671.30 -54.4 -50.4 -53.8 67 -99 SPO 1997 10 28 06 23 75 5.5 -9 671.30 -54.4 -50.4 -53.8 67 -99 SPO 1997 10 28 06 24 74 5.4 -9 671.30 -54.4 -50.5 -53.7 67 -99 SPO 1997 10 28 06 25 75 5.2 -9 671.30 -54.2 -50.5 -53.8 66 -99 SPO 1997 10 28 06 26 74 5.1 -9 671.30 -54.4 -50.6 -53.8 67 -99 SPO 1997 10 28 06 27 74 4.8 -9 671.30 -54.4 -50.8 -53.8 67 -99 SPO 1997 10 28 06 28 73 4.7 -9 671.30 -54.4 -50.9 -53.8 67 -99 SPO 1997 10 28 06 29 73 4.7 -9 671.30 -54.4 -51.0 -53.8 68 -99 SPO 1997 10 28 06 30 73 5.0 -9 671.30 -54.2 -51.0 -53.7 67 -99 SPO 1997 10 28 06 31 74 5.2 -9 671.30 -54.2 -50.9 -53.7 67 -99 SPO 1997 10 28 06 32 75 5.3 -9 671.30 -54.2 -50.8 -53.6 67 -99 SPO 1997 10 28 06 33 75 5.2 -9 671.30 -54.2 -50.8 -53.6 67 -99 SPO 1997 10 28 06 34 75 5.2 -9 671.30 -54.2 -50.8 -53.6 67 -99 SPO 1997 10 28 06 35 75 4.9 -9 671.30 -54.2 -50.8 -53.6 67 -99 SPO 1997 10 28 06 36 75 4.6 -9 671.30 -54.2 -50.8 -53.7 67 -99 SPO 1997 10 28 06 37 75 4.4 -9 671.30 -54.2 -50.9 -53.7 67 -99 SPO 1997 10 28 06 38 74 4.3 -9 671.30 -54.2 -51.0 -53.7 67 -99 SPO 1997 10 28 06 39 74 4.1 -9 671.30 -54.4 -51.0 -53.7 69 -99 SPO 1997 10 28 06 40 73 4.0 -9 671.30 -54.4 -51.0 -53.7 69 -99 SPO 1997 10 28 06 41 74 3.8 -9 671.30 -54.5 -51.1 -53.7 69 -99 SPO 1997 10 28 06 42 74 3.7 -9 671.30 -54.4 -51.2 -53.6 68 -99 SPO 1997 10 28 06 43 75 3.7 -9 671.30 -54.5 -51.3 -53.6 67 -99 SPO 1997 10 28 06 44 75 3.8 -9 671.30 -54.5 -51.4 -53.6 67 -99 SPO 1997 10 28 06 45 75 3.6 -9 671.30 -54.5 -51.4 -53.5 67 -99 SPO 1997 10 28 06 46 77 3.4 -9 671.30 -54.5 -51.5 -53.4 67 -99 SPO 1997 10 28 06 47 76 3.2 -9 671.30 -54.5 -51.5 -53.2 66 -99 SPO 1997 10 28 06 48 75 3.1 -9 671.30 -54.5 -51.5 -53.2 66 -99 SPO 1997 10 28 06 49 74 3.1 -9 671.30 -54.5 -51.5 -53.3 66 -99 SPO 1997 10 28 06 50 73 3.0 -9 671.30 -54.7 -51.5 -53.3 69 -99 SPO 1997 10 28 06 51 74 2.9 -9 671.30 -54.7 -51.5 -53.3 69 -99 SPO 1997 10 28 06 52 73 2.8 -9 671.20 -54.7 -51.5 -53.3 69 -99 SPO 1997 10 28 06 53 73 2.8 -9 671.20 -54.7 -51.5 -53.3 69 -99 SPO 1997 10 28 06 54 74 2.9 -9 671.20 -54.7 -51.4 -53.2 69 -99 SPO 1997 10 28 06 55 73 3.0 -9 671.20 -54.7 -51.4 -53.2 69 -99 SPO 1997 10 28 06 56 72 3.3 -9 671.20 -54.5 -51.4 -53.3 67 -99 SPO 1997 10 28 06 57 72 3.3 -9 671.20 -54.5 -51.3 -53.3 68 -99 SPO 1997 10 28 06 58 70 3.4 -9 671.20 -54.5 -51.3 -53.4 68 -99 SPO 1997 10 28 06 59 71 3.4 -9 671.20 -54.5 -51.3 -53.4 69 -99 SPO 1997 10 28 07 00 69 3.6 -9 671.20 -54.4 -51.2 -53.5 68 0 SPO 1997 10 28 07 01 71 3.9 -9 671.20 -54.4 -51.1 -53.5 68 -99 SPO 1997 10 28 07 02 72 4.1 -9 671.20 -54.2 -50.9 -53.4 67 -99 SPO 1997 10 28 07 03 74 4.5 -9 671.20 -54.2 -50.7 -53.4 67 -99 SPO 1997 10 28 07 04 75 4.7 -9 671.20 -54.2 -50.6 -53.3 67 -99 SPO 1997 10 28 07 05 75 4.9 -9 671.20 -54.2 -50.5 -53.3 67 -99 SPO 1997 10 28 07 06 76 4.8 -9 671.20 -54.2 -50.5 -53.4 67 -99 SPO 1997 10 28 07 07 77 4.8 -9 671.20 -54.2 -50.5 -53.4 68 -99 SPO 1997 10 28 07 08 77 4.9 -9 671.20 -54.4 -50.5 -53.4 69 -99 SPO 1997 10 28 07 09 78 4.9 -9 671.20 -54.4 -50.5 -53.4 68 -99 SPO 1997 10 28 07 10 79 4.8 -9 671.20 -54.4 -50.5 -53.3 68 -99 SPO 1997 10 28 07 11 80 4.7 -9 671.20 -54.5 -50.6 -53.3 69 -99 SPO 1997 10 28 07 12 80 4.7 -9 671.20 -54.5 -50.6 -53.2 68 -99 SPO 1997 10 28 07 13 81 4.7 -9 671.20 -54.5 -50.7 -53.2 68 -99 SPO 1997 10 28 07 14 82 4.7 -9 671.20 -54.5 -50.8 -53.2 68 -99 SPO 1997 10 28 07 15 82 4.9 -9 671.20 -54.5 -50.9 -53.3 67 -99 SPO 1997 10 28 07 16 82 4.9 -9 671.20 -54.7 -50.9 -53.4 69 -99 SPO 1997 10 28 07 17 82 4.7 -9 671.20 -54.7 -50.9 -53.4 66 -99 SPO 1997 10 28 07 18 81 4.6 -9 671.20 -54.7 -50.9 -53.5 66 -99 SPO 1997 10 28 07 19 81 4.6 -9 671.20 -54.9 -51.0 -53.6 66 -99 SPO 1997 10 28 07 20 81 4.7 -9 671.20 -54.9 -51.0 -53.7 66 -99 SPO 1997 10 28 07 21 81 4.7 -9 671.20 -54.9 -51.0 -53.7 66 -99 SPO 1997 10 28 07 22 80 4.9 -9 671.20 -54.9 -51.0 -53.6 66 -99 SPO 1997 10 28 07 23 79 4.9 -9 671.20 -54.7 -50.9 -53.7 65 -99 SPO 1997 10 28 07 24 78 4.8 -9 671.20 -54.7 -50.8 -53.8 65 -99 SPO 1997 10 28 07 25 78 4.8 -9 671.20 -54.7 -50.8 -53.7 66 -99 SPO 1997 10 28 07 26 78 4.9 -9 671.20 -54.7 -50.8 -53.8 66 -99 SPO 1997 10 28 07 27 78 5.0 -9 671.20 -54.7 -50.8 -53.8 66 -99 SPO 1997 10 28 07 28 78 5.1 -9 671.20 -54.7 -50.8 -53.8 68 -99 SPO 1997 10 28 07 29 79 5.1 -9 671.20 -54.5 -50.8 -53.8 66 -99 SPO 1997 10 28 07 30 78 5.3 -9 671.20 -54.5 -50.8 -53.8 67 -99 SPO 1997 10 28 07 31 77 5.3 -9 671.20 -54.5 -50.8 -53.9 67 -99 SPO 1997 10 28 07 32 78 5.3 -9 671.20 -54.5 -50.7 -53.8 66 -99 SPO 1997 10 28 07 33 78 5.3 -9 671.20 -54.5 -50.6 -53.8 66 -99 SPO 1997 10 28 07 34 78 5.3 -9 671.20 -54.4 -50.5 -53.8 66 -99 SPO 1997 10 28 07 35 77 5.3 -9 671.20 -54.4 -50.4 -53.7 67 -99 SPO 1997 10 28 07 36 75 5.3 -9 671.20 -54.4 -50.3 -53.7 67 -99 SPO 1997 10 28 07 37 75 5.3 -9 671.20 -54.2 -50.3 -53.8 66 -99 SPO 1997 10 28 07 38 74 5.3 -9 671.20 -54.2 -50.3 -53.8 66 -99 SPO 1997 10 28 07 39 73 5.2 -9 671.20 -54.2 -50.2 -53.8 67 -99 SPO 1997 10 28 07 40 73 5.3 -9 671.20 -54.2 -50.2 -53.7 67 -99 SPO 1997 10 28 07 41 73 5.4 -9 671.20 -54.0 -50.2 -53.7 66 -99 SPO 1997 10 28 07 42 74 5.3 -9 671.20 -54.0 -50.2 -53.6 67 -99 SPO 1997 10 28 07 43 75 5.2 -9 671.20 -54.0 -50.3 -53.6 67 -99 SPO 1997 10 28 07 44 75 5.2 -9 671.20 -54.0 -50.4 -53.6 67 -99 SPO 1997 10 28 07 45 75 5.1 -9 671.20 -54.0 -50.4 -53.6 67 -99 SPO 1997 10 28 07 46 75 5.0 -9 671.20 -54.0 -50.4 -53.6 67 -99 SPO 1997 10 28 07 47 75 5.0 -9 671.20 -54.0 -50.4 -53.5 67 -99 SPO 1997 10 28 07 48 75 5.0 -9 671.20 -54.0 -50.4 -53.5 67 -99 SPO 1997 10 28 07 49 74 5.1 -9 671.20 -54.0 -50.3 -53.5 67 -99 SPO 1997 10 28 07 50 73 5.2 -9 671.20 -54.0 -50.2 -53.6 68 -99 SPO 1997 10 28 07 51 73 5.2 -9 671.20 -54.0 -50.2 -53.5 68 -99 SPO 1997 10 28 07 52 73 5.2 -9 671.20 -54.0 -50.1 -53.5 68 -99 SPO 1997 10 28 07 53 72 5.1 -9 671.20 -53.9 -50.1 -53.4 68 -99 SPO 1997 10 28 07 54 72 5.2 -9 671.20 -53.9 -50.2 -53.4 68 -99 SPO 1997 10 28 07 55 72 5.2 -9 671.20 -53.9 -50.2 -53.3 68 -99 SPO 1997 10 28 07 56 73 5.3 -9 671.20 -53.7 -50.1 -53.3 67 -99 SPO 1997 10 28 07 57 73 5.3 -9 671.20 -53.7 -50.1 -53.3 67 -99 SPO 1997 10 28 07 58 73 5.3 -9 671.20 -54.0 -50.2 -53.4 70 -99 SPO 1997 10 28 07 59 73 5.3 -9 671.20 -54.0 -50.2 -53.4 68 -99 SPO 1997 10 28 08 00 74 5.4 -9 671.20 -54.0 -50.2 -53.5 67 0 SPO 1997 10 28 08 01 74 5.4 -9 671.20 -54.2 -50.3 -53.5 68 -99 SPO 1997 10 28 08 02 74 5.4 -9 671.10 -54.2 -50.3 -53.5 68 -99 SPO 1997 10 28 08 03 75 5.5 -9 671.10 -54.2 -50.3 -53.5 68 -99 SPO 1997 10 28 08 04 75 5.5 -9 671.10 -54.2 -50.3 -53.5 68 -99 SPO 1997 10 28 08 05 76 5.5 -9 671.10 -54.2 -50.2 -53.5 68 -99 SPO 1997 10 28 08 06 76 5.5 -9 671.10 -54.2 -50.2 -53.6 68 -99 SPO 1997 10 28 08 07 76 5.5 -9 671.10 -54.2 -50.2 -53.6 68 -99 SPO 1997 10 28 08 08 76 5.5 -9 671.10 -54.2 -50.2 -53.6 67 -99 SPO 1997 10 28 08 09 76 5.4 -9 671.10 -54.2 -50.2 -53.6 67 -99 SPO 1997 10 28 08 10 76 5.4 -9 671.10 -54.2 -50.2 -53.6 67 -99 SPO 1997 10 28 08 11 79 5.4 -9 671.10 -54.2 -50.2 -53.6 67 -99 SPO 1997 10 28 08 12 79 5.3 -9 671.10 -54.4 -50.2 -53.6 68 -99 SPO 1997 10 28 08 13 77 5.3 -9 671.10 -54.5 -50.2 -53.7 68 -99 SPO 1997 10 28 08 14 78 5.3 -9 671.10 -54.4 -50.2 -53.7 67 -99 SPO 1997 10 28 08 15 78 5.3 -9 671.10 -54.4 -50.2 -53.7 66 -99 SPO 1997 10 28 08 16 77 5.3 -9 671.10 -54.4 -50.2 -53.6 64 -99 SPO 1997 10 28 08 17 77 5.5 -9 671.10 -54.2 -50.2 -53.6 65 -99 SPO 1997 10 28 08 18 76 5.6 -9 671.10 -54.4 -50.2 -53.7 67 -99 SPO 1997 10 28 08 19 76 5.6 -9 671.10 -54.4 -50.2 -53.7 67 -99 SPO 1997 10 28 08 20 76 5.4 -9 671.10 -54.2 -50.2 -53.6 65 -99 SPO 1997 10 28 08 21 76 5.4 -9 671.00 -54.4 -50.1 -53.6 67 -99 SPO 1997 10 28 08 22 76 5.4 -9 671.00 -54.4 -50.1 -53.7 67 -99 SPO 1997 10 28 08 23 75 5.5 -9 671.00 -54.4 -50.0 -53.7 67 -99 SPO 1997 10 28 08 24 76 5.6 -9 671.00 -54.4 -50.0 -53.7 67 -99 SPO 1997 10 28 08 25 77 5.6 -9 671.00 -54.2 -49.9 -53.6 66 -99 SPO 1997 10 28 08 26 76 5.5 -9 671.00 -54.2 -50.0 -53.6 66 -99 SPO 1997 10 28 08 27 76 5.5 -9 671.00 -54.0 -50.0 -53.5 65 -99 SPO 1997 10 28 08 28 77 5.6 -9 671.00 -54.2 -50.0 -53.5 67 -99 SPO 1997 10 28 08 29 77 5.6 -9 671.00 -54.2 -50.0 -53.6 67 -99 SPO 1997 10 28 08 30 76 5.7 -9 671.00 -54.2 -50.0 -53.6 67 -99 SPO 1997 10 28 08 31 77 5.7 -9 671.00 -54.2 -49.9 -53.6 67 -99 SPO 1997 10 28 08 32 78 5.6 -9 671.00 -54.2 -49.9 -53.6 67 -99 SPO 1997 10 28 08 33 78 5.7 -9 671.00 -54.0 -50.0 -53.5 65 -99 SPO 1997 10 28 08 34 78 5.5 -9 671.00 -54.0 -50.0 -53.5 66 -99 SPO 1997 10 28 08 35 78 5.4 -9 671.00 -54.2 -50.2 -53.5 67 -99 SPO 1997 10 28 08 36 78 5.4 -9 670.90 -54.2 -50.2 -53.5 67 -99 SPO 1997 10 28 08 37 78 5.4 -9 670.90 -54.2 -50.3 -53.5 67 -99 SPO 1997 10 28 08 38 78 5.3 -9 670.90 -54.2 -50.3 -53.5 67 -99 SPO 1997 10 28 08 39 77 5.5 -9 670.90 -54.2 -50.3 -53.5 65 -99 SPO 1997 10 28 08 40 77 5.5 -9 670.90 -54.2 -50.3 -53.5 65 -99 SPO 1997 10 28 08 41 77 5.4 -9 670.90 -54.0 -50.2 -53.4 63 -99 SPO 1997 10 28 08 42 77 5.3 -9 670.90 -54.0 -50.2 -53.4 63 -99 SPO 1997 10 28 08 43 77 5.2 -9 670.90 -54.2 -50.2 -53.4 66 -99 SPO 1997 10 28 08 44 77 5.1 -9 670.90 -54.4 -50.2 -53.5 67 -99 SPO 1997 10 28 08 45 77 5.0 -9 670.90 -54.4 -50.2 -53.6 67 -99 SPO 1997 10 28 08 46 77 5.1 -9 670.90 -54.5 -50.2 -53.6 68 -99 SPO 1997 10 28 08 47 77 5.2 -9 670.90 -54.5 -50.2 -53.6 68 -99 SPO 1997 10 28 08 48 77 5.2 -9 670.90 -54.5 -50.2 -53.6 67 -99 SPO 1997 10 28 08 49 77 5.2 -9 670.90 -54.5 -50.2 -53.6 67 -99 SPO 1997 10 28 08 50 78 5.1 -9 670.90 -54.5 -50.2 -53.6 67 -99 SPO 1997 10 28 08 51 78 5.2 -9 670.90 -54.4 -50.2 -53.5 67 -99 SPO 1997 10 28 08 52 78 5.2 -9 670.80 -54.5 -50.2 -53.4 66 -99 SPO 1997 10 28 08 53 77 5.2 -9 670.80 -54.5 -50.3 -53.5 65 -99 SPO 1997 10 28 08 54 76 5.3 -9 670.80 -54.5 -50.3 -53.5 65 -99 SPO 1997 10 28 08 55 76 5.3 -9 670.80 -54.5 -50.2 -53.6 65 -99 SPO 1997 10 28 08 56 76 5.3 -9 670.80 -54.7 -50.1 -53.7 66 -99 SPO 1997 10 28 08 57 76 5.3 -9 670.80 -54.7 -50.0 -53.8 66 -99 SPO 1997 10 28 08 58 75 5.4 -9 670.80 -54.7 -50.0 -53.8 66 -99 SPO 1997 10 28 08 59 75 5.5 -9 670.80 -54.5 -50.0 -53.8 65 -99 SPO 1997 10 28 09 00 75 5.6 -9 670.80 -54.5 -50.0 -53.8 65 0 SPO 1997 10 28 09 01 75 5.6 -9 670.80 -54.4 -50.0 -53.8 66 -99 SPO 1997 10 28 09 02 75 5.6 -9 670.80 -54.4 -50.0 -53.8 67 -99 SPO 1997 10 28 09 03 74 5.6 -9 670.80 -54.2 -50.0 -53.7 65 -99 SPO 1997 10 28 09 04 74 5.6 -9 670.80 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 09 05 73 5.5 -9 670.80 -54.2 -50.0 -53.7 67 -99 SPO 1997 10 28 09 06 74 5.5 -9 670.80 -54.2 -50.1 -53.6 67 -99 SPO 1997 10 28 09 07 73 5.6 -9 670.80 -54.0 -50.1 -53.6 65 -99 SPO 1997 10 28 09 08 73 5.6 -9 670.80 -54.0 -50.1 -53.5 66 -99 SPO 1997 10 28 09 09 73 5.7 -9 670.80 -54.0 -50.1 -53.5 66 -99 SPO 1997 10 28 09 10 72 5.7 -9 670.80 -54.0 -50.2 -53.5 66 -99 SPO 1997 10 28 09 11 72 5.7 -9 670.80 -53.9 -50.2 -53.4 66 -99 SPO 1997 10 28 09 12 72 5.5 -9 670.80 -53.9 -50.2 -53.4 67 -99 SPO 1997 10 28 09 13 71 5.4 -9 670.80 -53.9 -50.3 -53.4 67 -99 SPO 1997 10 28 09 14 71 5.4 -9 670.80 -53.9 -50.3 -53.4 68 -99 SPO 1997 10 28 09 15 72 5.4 -9 670.80 -53.9 -50.2 -53.4 69 -99 SPO 1997 10 28 09 16 72 5.2 -9 670.80 -53.9 -50.2 -53.4 68 -99 SPO 1997 10 28 09 17 71 5.1 -9 670.80 -53.9 -50.2 -53.4 69 -99 SPO 1997 10 28 09 18 72 5.1 -9 670.80 -53.9 -50.3 -53.4 69 -99 SPO 1997 10 28 09 19 74 5.1 -9 670.80 -54.0 -50.2 -53.4 70 -99 SPO 1997 10 28 09 20 75 5.1 -9 670.80 -54.0 -50.3 -53.4 69 -99 SPO 1997 10 28 09 21 76 5.2 -9 670.80 -54.0 -50.3 -53.4 69 -99 SPO 1997 10 28 09 22 76 5.4 -9 670.80 -54.0 -50.3 -53.4 68 -99 SPO 1997 10 28 09 23 76 5.6 -9 670.80 -54.0 -50.3 -53.5 67 -99 SPO 1997 10 28 09 24 77 5.6 -9 670.80 -54.0 -50.3 -53.5 67 -99 SPO 1997 10 28 09 25 77 5.6 -9 670.80 -54.0 -50.3 -53.5 68 -99 SPO 1997 10 28 09 26 77 5.7 -9 670.80 -54.0 -50.3 -53.5 68 -99 SPO 1997 10 28 09 27 77 5.7 -9 670.80 -54.0 -50.3 -53.6 68 -99 SPO 1997 10 28 09 28 76 5.6 -9 670.80 -54.0 -50.3 -53.6 68 -99 SPO 1997 10 28 09 29 77 5.7 -9 670.80 -54.0 -50.3 -53.6 67 -99 SPO 1997 10 28 09 30 78 5.6 -9 670.80 -54.0 -50.3 -53.6 67 -99 SPO 1997 10 28 09 31 78 5.5 -9 670.80 -54.0 -50.4 -53.5 67 -99 SPO 1997 10 28 09 32 78 5.4 -9 670.80 -54.0 -50.6 -53.6 67 -99 SPO 1997 10 28 09 33 78 5.4 -9 670.80 -54.2 -50.6 -53.6 68 -99 SPO 1997 10 28 09 34 77 5.5 -9 670.80 -54.2 -50.7 -53.7 67 -99 SPO 1997 10 28 09 35 77 5.6 -9 670.80 -54.2 -50.6 -53.7 67 -99 SPO 1997 10 28 09 36 78 5.7 -9 670.80 -54.2 -50.4 -53.7 67 -99 SPO 1997 10 28 09 37 78 5.8 -9 670.80 -54.2 -50.5 -53.6 67 -99 SPO 1997 10 28 09 38 79 5.8 -9 670.80 -54.2 -50.5 -53.6 67 -99 SPO 1997 10 28 09 39 79 5.7 -9 670.80 -54.0 -50.5 -53.6 67 -99 SPO 1997 10 28 09 40 80 5.6 -9 670.80 -54.0 -50.6 -53.6 66 -99 SPO 1997 10 28 09 41 80 5.6 -9 670.80 -54.2 -50.7 -53.7 67 -99 SPO 1997 10 28 09 42 80 5.7 -9 670.80 -54.2 -50.6 -53.7 67 -99 SPO 1997 10 28 09 43 81 5.8 -9 670.80 -54.2 -50.6 -53.7 67 -99 SPO 1997 10 28 09 44 81 5.7 -9 670.80 -54.2 -50.6 -53.7 67 -99 SPO 1997 10 28 09 45 80 5.8 -9 670.80 -54.4 -50.7 -53.7 68 -99 SPO 1997 10 28 09 46 80 5.6 -9 670.80 -54.4 -50.7 -53.8 68 -99 SPO 1997 10 28 09 47 80 5.6 -9 670.80 -54.2 -50.6 -53.8 66 -99 SPO 1997 10 28 09 48 79 5.5 -9 670.80 -54.4 -50.6 -53.8 67 -99 SPO 1997 10 28 09 49 78 5.5 -9 670.80 -54.2 -50.7 -53.8 65 -99 SPO 1997 10 28 09 50 79 5.5 -9 670.80 -54.2 -50.8 -53.8 65 -99 SPO 1997 10 28 09 51 78 5.5 -9 670.80 -54.4 -50.8 -53.8 67 -99 SPO 1997 10 28 09 52 78 5.5 -9 670.80 -54.4 -50.8 -53.8 67 -99 SPO 1997 10 28 09 53 78 5.5 -9 670.80 -54.5 -50.8 -53.8 67 -99 SPO 1997 10 28 09 54 78 5.5 -9 670.80 -54.5 -50.8 -53.9 67 -99 SPO 1997 10 28 09 55 79 5.5 -9 670.80 -54.5 -50.8 -53.8 67 -99 SPO 1997 10 28 09 56 79 5.4 -9 670.70 -54.5 -50.8 -53.9 67 -99 SPO 1997 10 28 09 57 79 5.4 -9 670.70 -54.5 -50.8 -53.9 66 -99 SPO 1997 10 28 09 58 79 5.5 -9 670.70 -54.5 -50.8 -53.9 66 -99 SPO 1997 10 28 09 59 80 5.5 -9 670.70 -54.5 -50.8 -53.8 66 -99 SPO 1997 10 28 10 00 79 5.3 -9 670.70 -54.5 -50.9 -53.8 66 0 SPO 1997 10 28 10 01 80 5.2 -9 670.70 -54.5 -50.9 -53.8 65 -99 SPO 1997 10 28 10 02 80 5.1 -9 670.70 -54.7 -51.0 -53.8 66 -99 SPO 1997 10 28 10 03 80 5.2 -9 670.70 -54.7 -51.0 -53.8 65 -99 SPO 1997 10 28 10 04 79 5.1 -9 670.70 -54.7 -51.1 -53.8 65 -99 SPO 1997 10 28 10 05 79 5.1 -9 670.70 -54.7 -51.0 -53.8 64 -99 SPO 1997 10 28 10 06 78 5.0 -9 670.70 -54.7 -51.0 -53.8 65 -99 SPO 1997 10 28 10 07 77 5.0 -9 670.70 -54.7 -50.9 -53.9 65 -99 SPO 1997 10 28 10 08 77 4.9 -9 670.70 -54.7 -50.7 -53.9 65 -99 SPO 1997 10 28 10 09 77 4.9 -9 670.70 -54.7 -50.7 -53.9 66 -99 SPO 1997 10 28 10 10 76 4.8 -9 670.70 -54.7 -50.7 -53.9 66 -99 SPO 1997 10 28 10 11 76 4.6 -9 670.70 -54.7 -50.9 -53.9 66 -99 SPO 1997 10 28 10 12 75 4.6 -9 670.70 -54.7 -51.0 -53.9 66 -99 SPO 1997 10 28 10 13 75 4.6 -9 670.70 -54.5 -51.0 -53.8 65 -99 SPO 1997 10 28 10 14 76 4.7 -9 670.70 -54.5 -50.9 -53.8 66 -99 SPO 1997 10 28 10 15 76 4.8 -9 670.70 -54.5 -50.8 -53.8 66 -99 SPO 1997 10 28 10 16 76 4.8 -9 670.70 -54.5 -50.7 -53.7 66 -99 SPO 1997 10 28 10 17 76 4.8 -9 670.70 -54.5 -50.7 -53.8 66 -99 SPO 1997 10 28 10 18 77 5.0 -9 670.70 -54.5 -50.7 -53.8 66 -99 SPO 1997 10 28 10 19 77 5.0 -9 670.70 -54.5 -50.7 -53.7 66 -99 SPO 1997 10 28 10 20 78 5.0 -9 670.70 -54.5 -50.8 -53.6 67 -99 SPO 1997 10 28 10 21 78 4.8 -9 670.70 -54.5 -50.8 -53.6 67 -99 SPO 1997 10 28 10 22 78 4.8 -9 670.70 -54.5 -50.9 -53.6 66 -99 SPO 1997 10 28 10 23 79 5.0 -9 670.70 -54.5 -50.8 -53.6 66 -99 SPO 1997 10 28 10 24 78 5.2 -9 670.70 -54.5 -50.7 -53.7 66 -99 SPO 1997 10 28 10 25 79 5.2 -9 670.70 -54.5 -50.7 -53.7 66 -99 SPO 1997 10 28 10 26 79 5.2 -9 670.70 -54.5 -50.7 -53.8 66 -99 SPO 1997 10 28 10 27 79 5.2 -9 670.70 -54.5 -50.8 -53.7 66 -99 SPO 1997 10 28 10 28 79 5.3 -9 670.70 -54.5 -50.9 -53.8 67 -99 SPO 1997 10 28 10 29 79 5.2 -9 670.70 -54.5 -51.0 -53.8 67 -99 SPO 1997 10 28 10 30 80 5.2 -9 670.70 -54.5 -51.0 -53.8 66 -99 SPO 1997 10 28 10 31 80 5.1 -9 670.70 -54.5 -51.0 -53.8 66 -99 SPO 1997 10 28 10 32 80 5.0 -9 670.70 -54.5 -51.2 -53.8 65 -99 SPO 1997 10 28 10 33 80 4.9 -9 670.80 -54.5 -51.2 -53.8 65 -99 SPO 1997 10 28 10 34 79 4.7 -9 670.80 -54.7 -51.3 -53.8 66 -99 SPO 1997 10 28 10 35 80 4.6 -9 670.80 -54.7 -51.3 -53.8 68 -99 SPO 1997 10 28 10 36 81 4.5 -9 670.80 -54.7 -51.4 -53.8 68 -99 SPO 1997 10 28 10 37 82 4.4 -9 670.80 -54.7 -51.5 -53.7 68 -99 SPO 1997 10 28 10 38 83 4.2 -9 670.80 -54.7 -51.5 -53.6 68 -99 SPO 1997 10 28 10 39 84 4.0 -9 670.80 -54.7 -51.5 -53.6 66 -99 SPO 1997 10 28 10 40 83 3.9 -9 670.80 -54.9 -51.6 -53.5 68 -99 SPO 1997 10 28 10 41 82 3.7 -9 670.80 -55.0 -51.6 -53.5 68 -99 SPO 1997 10 28 10 42 80 3.6 -9 670.80 -55.0 -51.7 -53.6 68 -99 SPO 1997 10 28 10 43 81 3.7 -9 670.80 -55.0 -51.7 -53.6 68 -99 SPO 1997 10 28 10 44 82 3.9 -9 670.80 -55.0 -51.7 -53.5 67 -99 SPO 1997 10 28 10 45 82 4.0 -9 670.80 -55.0 -51.6 -53.3 66 -99 SPO 1997 10 28 10 46 81 3.9 -9 670.80 -55.0 -51.5 -53.3 66 -99 SPO 1997 10 28 10 47 80 3.9 -9 670.80 -55.0 -51.5 -53.4 66 -99 SPO 1997 10 28 10 48 79 3.8 -9 670.80 -55.0 -51.5 -53.5 65 -99 SPO 1997 10 28 10 49 79 3.9 -9 670.80 -55.0 -51.5 -53.6 66 -99 SPO 1997 10 28 10 50 78 3.9 -9 670.80 -55.2 -51.5 -53.5 67 -99 SPO 1997 10 28 10 51 78 4.0 -9 670.80 -55.2 -51.4 -53.4 67 -99 SPO 1997 10 28 10 52 78 4.0 -9 670.80 -55.2 -51.4 -53.4 66 -99 SPO 1997 10 28 10 53 78 3.9 -9 670.70 -55.2 -51.4 -53.5 67 -99 SPO 1997 10 28 10 54 77 4.0 -9 670.70 -55.2 -51.3 -53.6 67 -99 SPO 1997 10 28 10 55 78 4.2 -9 670.70 -55.2 -51.2 -53.6 67 -99 SPO 1997 10 28 10 56 78 4.3 -9 670.70 -55.0 -51.2 -53.6 66 -99 SPO 1997 10 28 10 57 78 4.2 -9 670.70 -55.2 -51.1 -53.7 68 -99 SPO 1997 10 28 10 58 78 4.2 -9 670.70 -55.2 -51.1 -53.8 68 -99 SPO 1997 10 28 10 59 78 4.2 -9 670.70 -55.2 -51.1 -53.8 68 -99 SPO 1997 10 28 11 00 79 4.4 -9 670.70 -55.2 -51.1 -53.8 68 0 SPO 1997 10 28 11 01 78 4.6 -9 670.70 -55.2 -51.1 -53.8 67 -99 SPO 1997 10 28 11 02 78 4.7 -9 670.70 -55.2 -51.0 -53.9 66 -99 SPO 1997 10 28 11 03 76 4.7 -9 670.70 -55.2 -51.0 -54.0 66 -99 SPO 1997 10 28 11 04 77 4.7 -9 670.70 -55.2 -50.9 -54.1 66 -99 SPO 1997 10 28 11 05 77 4.9 -9 670.70 -55.2 -50.9 -54.0 66 -99 SPO 1997 10 28 11 06 77 4.8 -9 670.70 -55.2 -50.9 -54.0 66 -99 SPO 1997 10 28 11 07 76 4.8 -9 670.70 -55.2 -50.9 -54.0 66 -99 SPO 1997 10 28 11 08 76 5.0 -9 670.70 -55.2 -50.8 -54.1 66 -99 SPO 1997 10 28 11 09 74 5.1 -9 670.70 -55.2 -50.8 -54.0 66 -99 SPO 1997 10 28 11 10 76 4.8 -9 670.70 -55.0 -50.8 -54.0 65 -99 SPO 1997 10 28 11 11 76 5.1 -9 670.70 -54.9 -50.8 -54.0 65 -99 SPO 1997 10 28 11 12 75 5.2 -9 670.70 -54.7 -50.8 -53.8 64 -99 SPO 1997 10 28 11 13 76 5.2 -9 670.70 -54.7 -50.8 -53.8 65 -99 SPO 1997 10 28 11 14 77 5.2 -9 670.70 -54.7 -50.8 -53.8 65 -99 SPO 1997 10 28 11 15 78 5.2 -9 670.70 -54.7 -50.8 -53.7 66 -99 SPO 1997 10 28 11 16 79 5.1 -9 670.70 -54.7 -51.0 -53.7 66 -99 SPO 1997 10 28 11 17 78 5.2 -9 670.70 -54.7 -51.0 -53.8 66 -99 SPO 1997 10 28 11 18 78 5.2 -9 670.70 -54.7 -51.0 -53.8 66 -99 SPO 1997 10 28 11 19 78 5.3 -9 670.70 -54.7 -51.2 -53.8 66 -99 SPO 1997 10 28 11 20 79 5.4 -9 670.70 -54.7 -51.2 -53.9 66 -99 SPO 1997 10 28 11 21 76 5.4 -9 670.70 -54.7 -51.2 -54.0 68 -99 SPO 1997 10 28 11 22 78 5.6 -9 670.70 -54.7 -51.2 -54.0 68 -99 SPO 1997 10 28 11 23 77 5.6 -9 670.60 -54.7 -51.3 -54.1 68 -99 SPO 1997 10 28 11 24 76 5.6 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 25 77 5.7 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 26 76 5.5 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 27 76 5.5 -9 670.70 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 28 76 5.7 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 29 76 5.6 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 30 74 5.6 -9 670.60 -54.5 -51.2 -54.1 67 -99 SPO 1997 10 28 11 31 73 5.5 -9 670.60 -54.4 -51.1 -54.0 66 -99 SPO 1997 10 28 11 32 73 5.5 -9 670.60 -54.4 -51.1 -54.0 66 -99 SPO 1997 10 28 11 33 73 5.5 -9 670.60 -54.4 -51.0 -54.0 66 -99 SPO 1997 10 28 11 34 73 5.5 -9 670.60 -54.4 -51.0 -54.0 66 -99 SPO 1997 10 28 11 35 72 5.2 -9 670.60 -54.5 -51.0 -54.0 67 -99 SPO 1997 10 28 11 36 73 5.2 -9 670.60 -54.5 -51.0 -54.0 67 -99 SPO 1997 10 28 11 37 74 5.2 -9 670.60 -54.5 -51.1 -54.0 67 -99 SPO 1997 10 28 11 38 73 5.3 -9 670.60 -54.5 -51.1 -54.0 67 -99 SPO 1997 10 28 11 39 73 5.2 -9 670.60 -54.5 -51.2 -54.0 67 -99 SPO 1997 10 28 11 40 74 5.2 -9 670.60 -54.5 -51.1 -54.0 67 -99 SPO 1997 10 28 11 41 74 5.1 -9 670.60 -54.5 -51.2 -54.0 67 -99 SPO 1997 10 28 11 42 75 5.2 -9 670.60 -54.5 -51.2 -54.0 67 -99 SPO 1997 10 28 11 43 76 5.2 -9 670.60 -54.5 -51.2 -54.0 67 -99 SPO 1997 10 28 11 44 77 5.0 -9 670.60 -54.5 -51.3 -54.0 67 -99 SPO 1997 10 28 11 45 78 5.0 -9 670.60 -54.5 -51.3 -54.0 66 -99 SPO 1997 10 28 11 46 78 5.1 -9 670.60 -54.5 -51.3 -54.0 65 -99 SPO 1997 10 28 11 47 79 5.3 -9 670.60 -54.5 -51.3 -54.0 65 -99 SPO 1997 10 28 11 48 79 5.6 -9 670.60 -54.7 -51.3 -54.0 66 -99 SPO 1997 10 28 11 49 78 5.6 -9 670.60 -54.7 -51.3 -54.0 66 -99 SPO 1997 10 28 11 50 77 5.7 -9 670.60 -54.5 -51.2 -54.1 64 -99 SPO 1997 10 28 11 51 78 5.7 -9 670.60 -54.5 -51.2 -54.1 64 -99 SPO 1997 10 28 11 52 78 5.9 -9 670.60 -54.5 -51.2 -54.1 64 -99 SPO 1997 10 28 11 53 78 5.7 -9 670.50 -54.5 -51.2 -54.1 64 -99 SPO 1997 10 28 11 54 78 5.7 -9 670.60 -54.7 -51.3 -54.1 65 -99 SPO 1997 10 28 11 55 77 5.7 -9 670.60 -54.7 -51.3 -54.1 65 -99 SPO 1997 10 28 11 56 77 5.8 -9 670.50 -54.7 -51.4 -54.1 65 -99 SPO 1997 10 28 11 57 77 5.9 -9 670.50 -54.5 -51.4 -54.1 64 -99 SPO 1997 10 28 11 58 77 5.8 -9 670.50 -54.5 -51.4 -54.1 64 -99 SPO 1997 10 28 11 59 76 5.8 -9 670.50 -54.5 -51.4 -54.1 65 -99 SPO 1997 10 28 12 00 76 5.8 -9 670.50 -54.5 -51.5 -54.1 64 0 SPO 1997 10 28 12 01 77 5.6 -9 670.50 -54.5 -51.5 -54.1 64 -99 SPO 1997 10 28 12 02 76 5.3 -9 670.60 -54.5 -51.5 -54.1 63 -99 SPO 1997 10 28 12 03 76 5.4 -9 670.50 -54.5 -51.4 -54.1 63 -99 SPO 1997 10 28 12 04 76 5.5 -9 670.50 -54.5 -51.4 -54.0 64 -99 SPO 1997 10 28 12 05 76 5.5 -9 670.50 -54.5 -51.4 -54.0 64 -99 SPO 1997 10 28 12 06 76 5.5 -9 670.50 -54.4 -51.4 -53.9 63 -99 SPO 1997 10 28 12 07 76 5.6 -9 670.50 -54.4 -51.4 -53.9 64 -99 SPO 1997 10 28 12 08 75 5.5 -9 670.50 -54.4 -51.4 -53.9 67 -99 SPO 1997 10 28 12 09 75 5.6 -9 670.50 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 10 75 5.5 -9 670.40 -54.4 -51.4 -53.9 67 -99 SPO 1997 10 28 12 11 74 5.5 -9 670.50 -54.4 -51.4 -53.9 67 -99 SPO 1997 10 28 12 12 73 5.4 -9 670.50 -54.2 -51.4 -53.9 67 -99 SPO 1997 10 28 12 13 73 5.4 -9 670.50 -54.2 -51.4 -53.8 67 -99 SPO 1997 10 28 12 14 73 5.5 -9 670.50 -54.2 -51.4 -53.8 67 -99 SPO 1997 10 28 12 15 74 5.6 -9 670.40 -54.2 -51.4 -53.8 66 -99 SPO 1997 10 28 12 16 74 5.3 -9 670.40 -54.2 -51.4 -53.8 65 -99 SPO 1997 10 28 12 17 74 5.3 -9 670.40 -54.2 -51.4 -53.8 65 -99 SPO 1997 10 28 12 18 74 5.4 -9 670.50 -54.2 -51.5 -53.8 65 -99 SPO 1997 10 28 12 19 74 5.2 -9 670.50 -54.2 -51.5 -53.8 65 -99 SPO 1997 10 28 12 20 75 5.1 -9 670.40 -54.2 -51.5 -53.8 65 -99 SPO 1997 10 28 12 21 75 5.2 -9 670.40 -54.4 -51.5 -53.8 67 -99 SPO 1997 10 28 12 22 74 5.1 -9 670.50 -54.2 -51.4 -53.8 66 -99 SPO 1997 10 28 12 23 72 4.8 -9 670.50 -54.2 -51.5 -53.9 66 -99 SPO 1997 10 28 12 24 73 4.8 -9 670.40 -54.4 -51.5 -53.9 68 -99 SPO 1997 10 28 12 25 72 4.8 -9 670.40 -54.4 -51.5 -53.9 68 -99 SPO 1997 10 28 12 26 72 4.9 -9 670.40 -54.4 -51.5 -53.9 68 -99 SPO 1997 10 28 12 27 72 4.9 -9 670.40 -54.4 -51.4 -53.9 68 -99 SPO 1997 10 28 12 28 72 5.1 -9 670.40 -54.4 -51.5 -53.9 68 -99 SPO 1997 10 28 12 29 73 5.3 -9 670.40 -54.4 -51.5 -53.8 67 -99 SPO 1997 10 28 12 30 73 5.3 -9 670.40 -54.4 -51.4 -53.8 67 -99 SPO 1997 10 28 12 31 73 5.4 -9 670.40 -54.4 -51.4 -53.8 67 -99 SPO 1997 10 28 12 32 73 5.5 -9 670.40 -54.2 -51.4 -53.8 65 -99 SPO 1997 10 28 12 33 73 5.4 -9 670.40 -54.2 -51.4 -53.8 66 -99 SPO 1997 10 28 12 34 72 5.3 -9 670.40 -54.2 -51.4 -53.9 66 -99 SPO 1997 10 28 12 35 72 5.3 -9 670.40 -54.2 -51.3 -53.8 66 -99 SPO 1997 10 28 12 36 72 5.4 -9 670.40 -54.2 -51.3 -53.8 67 -99 SPO 1997 10 28 12 37 73 5.6 -9 670.40 -54.2 -51.2 -53.8 67 -99 SPO 1997 10 28 12 38 73 5.6 -9 670.40 -54.2 -51.2 -53.8 67 -99 SPO 1997 10 28 12 39 73 5.5 -9 670.40 -54.2 -51.2 -53.9 67 -99 SPO 1997 10 28 12 40 73 5.5 -9 670.40 -54.2 -51.3 -53.9 66 -99 SPO 1997 10 28 12 41 73 5.6 -9 670.40 -54.2 -51.4 -53.9 66 -99 SPO 1997 10 28 12 42 72 5.8 -9 670.40 -54.2 -51.4 -53.9 66 -99 SPO 1997 10 28 12 43 73 6.0 -9 670.40 -54.2 -51.3 -54.0 66 -99 SPO 1997 10 28 12 44 73 5.9 -9 670.40 -54.4 -51.3 -54.0 67 -99 SPO 1997 10 28 12 45 74 5.8 -9 670.40 -54.4 -51.3 -54.0 67 -99 SPO 1997 10 28 12 46 74 5.8 -9 670.40 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 47 74 5.7 -9 670.40 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 48 74 5.8 -9 670.40 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 49 74 5.8 -9 670.40 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 50 75 5.9 -9 670.40 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 51 74 5.9 -9 670.30 -54.4 -51.5 -54.0 67 -99 SPO 1997 10 28 12 52 75 6.0 -9 670.30 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 53 74 5.9 -9 670.30 -54.4 -51.4 -54.0 67 -99 SPO 1997 10 28 12 54 73 5.8 -9 670.40 -54.4 -51.3 -54.0 67 -99 SPO 1997 10 28 12 55 73 5.7 -9 670.40 -54.4 -51.3 -54.0 67 -99 SPO 1997 10 28 12 56 73 5.6 -9 670.40 -54.2 -51.2 -54.0 65 -99 SPO 1997 10 28 12 57 73 5.5 -9 670.40 -54.2 -51.2 -54.0 65 -99 SPO 1997 10 28 12 58 73 5.6 -9 670.40 -54.4 -51.2 -54.0 67 -99 SPO 1997 10 28 12 59 74 5.7 -9 670.40 -54.4 -51.2 -54.0 66 -99 SPO 1997 10 28 13 00 74 5.7 -9 670.40 -54.4 -51.2 -54.0 66 0 SPO 1997 10 28 13 01 74 5.7 -9 670.40 -54.4 -51.3 -54.0 64 -99 SPO 1997 10 28 13 02 74 5.7 -9 670.40 -54.4 -51.3 -54.0 64 -99 SPO 1997 10 28 13 03 74 5.7 -9 670.40 -54.4 -51.4 -54.0 66 -99 SPO 1997 10 28 13 04 73 5.8 -9 670.40 -54.4 -51.4 -54.0 66 -99 SPO 1997 10 28 13 05 74 5.8 -9 670.40 -54.2 -51.4 -54.0 65 -99 SPO 1997 10 28 13 06 75 5.9 -9 670.40 -54.4 -51.5 -54.0 67 -99 SPO 1997 10 28 13 07 75 5.8 -9 670.40 -54.4 -51.6 -54.0 67 -99 SPO 1997 10 28 13 08 75 5.8 -9 670.40 -54.4 -51.7 -54.0 67 -99 SPO 1997 10 28 13 09 75 5.8 -9 670.40 -54.4 -51.8 -54.1 67 -99 SPO 1997 10 28 13 10 74 5.7 -9 670.40 -54.5 -51.8 -54.1 67 -99 SPO 1997 10 28 13 11 73 5.6 -9 670.40 -54.5 -51.8 -54.1 66 -99 SPO 1997 10 28 13 12 73 5.5 -9 670.40 -54.5 -51.7 -54.2 65 -99 SPO 1997 10 28 13 13 72 5.5 -9 670.40 -54.5 -51.7 -54.2 64 -99 SPO 1997 10 28 13 14 71 5.3 -9 670.40 -54.5 -51.8 -54.2 64 -99 SPO 1997 10 28 13 15 69 5.3 -9 670.40 -54.5 -51.8 -54.2 64 -99 SPO 1997 10 28 13 16 69 5.3 -9 670.40 -54.5 -51.8 -54.2 65 -99 SPO 1997 10 28 13 17 69 5.3 -9 670.40 -54.5 -51.8 -54.1 65 -99 SPO 1997 10 28 13 18 69 5.3 -9 670.40 -54.5 -51.8 -54.1 65 -99 SPO 1997 10 28 13 19 68 5.3 -9 670.40 -54.5 -51.7 -54.1 65 -99 SPO 1997 10 28 13 20 68 5.3 -9 670.40 -54.5 -51.7 -54.1 65 -99 SPO 1997 10 28 13 21 68 5.2 -9 670.40 -54.5 -51.7 -54.1 65 -99 SPO 1997 10 28 13 22 68 5.2 -9 670.40 -54.5 -51.6 -54.1 66 -99 SPO 1997 10 28 13 23 67 5.3 -9 670.40 -54.5 -51.6 -54.1 66 -99 SPO 1997 10 28 13 24 67 5.3 -9 670.40 -54.5 -51.5 -54.1 66 -99 SPO 1997 10 28 13 25 66 5.3 -9 670.40 -54.5 -51.4 -54.1 66 -99 SPO 1997 10 28 13 26 65 5.2 -9 670.40 -54.5 -51.4 -54.1 66 -99 SPO 1997 10 28 13 27 64 5.2 -9 670.40 -54.5 -51.4 -54.1 65 -99 SPO 1997 10 28 13 28 64 5.1 -9 670.40 -54.5 -51.4 -54.1 66 -99 SPO 1997 10 28 13 29 64 5.2 -9 670.40 -54.5 -51.4 -54.1 65 -99 SPO 1997 10 28 13 30 64 5.3 -9 670.40 -54.5 -51.3 -54.1 65 -99 SPO 1997 10 28 13 31 64 5.2 -9 670.40 -54.5 -51.3 -54.2 66 -99 SPO 1997 10 28 13 32 63 5.0 -9 670.40 -54.5 -51.3 -54.2 66 -99 SPO 1997 10 28 13 33 64 5.0 -9 670.40 -54.7 -51.3 -54.2 68 -99 SPO 1997 10 28 13 34 64 5.0 -9 670.40 -54.7 -51.3 -54.2 68 -99 SPO 1997 10 28 13 35 64 5.0 -9 670.40 -54.7 -51.3 -54.3 66 -99 SPO 1997 10 28 13 36 64 4.9 -9 670.40 -54.7 -51.3 -54.3 66 -99 SPO 1997 10 28 13 37 65 4.8 -9 670.40 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 13 38 65 4.7 -9 670.40 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 13 39 65 4.6 -9 670.40 -54.7 -51.4 -54.3 65 -99 SPO 1997 10 28 13 40 66 4.6 -9 670.40 -54.7 -51.4 -54.2 65 -99 SPO 1997 10 28 13 41 65 4.7 -9 670.40 -54.7 -51.4 -54.2 64 -99 SPO 1997 10 28 13 42 65 4.5 -9 670.40 -54.7 -51.4 -54.2 63 -99 SPO 1997 10 28 13 43 64 4.5 -9 670.40 -54.7 -51.4 -54.3 63 -99 SPO 1997 10 28 13 44 63 4.5 -9 670.40 -54.7 -51.4 -54.3 63 -99 SPO 1997 10 28 13 45 64 4.5 -9 670.40 -54.9 -51.4 -54.3 65 -99 SPO 1997 10 28 13 46 64 4.6 -9 670.40 -54.9 -51.5 -54.3 65 -99 SPO 1997 10 28 13 47 65 4.5 -9 670.40 -54.9 -51.5 -54.3 66 -99 SPO 1997 10 28 13 48 66 4.4 -9 670.40 -55.0 -51.6 -54.3 66 -99 SPO 1997 10 28 13 49 66 4.4 -9 670.40 -55.0 -51.6 -54.3 66 -99 SPO 1997 10 28 13 50 66 4.5 -9 670.40 -55.0 -51.7 -54.3 66 -99 SPO 1997 10 28 13 51 66 4.5 -9 670.40 -55.0 -51.7 -54.3 64 -99 SPO 1997 10 28 13 52 67 4.4 -9 670.40 -55.0 -51.7 -54.2 64 -99 SPO 1997 10 28 13 53 68 4.3 -9 670.40 -55.0 -51.7 -54.2 64 -99 SPO 1997 10 28 13 54 69 4.2 -9 670.40 -55.2 -51.8 -54.3 65 -99 SPO 1997 10 28 13 55 70 4.2 -9 670.40 -55.2 -51.8 -54.2 64 -99 SPO 1997 10 28 13 56 69 4.3 -9 670.40 -55.2 -51.8 -54.3 64 -99 SPO 1997 10 28 13 57 68 4.4 -9 670.40 -55.2 -51.8 -54.3 63 -99 SPO 1997 10 28 13 58 68 4.4 -9 670.40 -55.2 -51.8 -54.3 63 -99 SPO 1997 10 28 13 59 67 4.5 -9 670.40 -55.2 -51.7 -54.3 64 -99 SPO 1997 10 28 14 00 68 4.5 -9 670.40 -55.2 -51.7 -54.4 64 0 SPO 1997 10 28 14 01 69 4.6 -9 670.40 -55.4 -51.6 -54.4 65 -99 SPO 1997 10 28 14 02 71 4.5 -9 670.30 -55.4 -51.6 -54.4 65 -99 SPO 1997 10 28 14 03 74 4.5 -9 670.30 -55.5 -51.7 -54.4 65 -99 SPO 1997 10 28 14 04 75 4.4 -9 670.30 -55.5 -51.7 -54.4 65 -99 SPO 1997 10 28 14 05 74 4.3 -9 670.30 -55.5 -51.8 -54.3 65 -99 SPO 1997 10 28 14 06 75 4.3 -9 670.30 -55.5 -51.8 -54.3 64 -99 SPO 1997 10 28 14 07 76 4.2 -9 670.30 -55.5 -51.9 -54.2 63 -99 SPO 1997 10 28 14 08 76 4.2 -9 670.30 -55.5 -52.0 -54.2 62 -99 SPO 1997 10 28 14 09 76 4.3 -9 670.30 -55.5 -52.0 -54.2 62 -99 SPO 1997 10 28 14 10 77 4.3 -9 670.30 -55.5 -52.1 -54.2 62 -99 SPO 1997 10 28 14 11 77 4.3 -9 670.30 -55.5 -52.2 -54.2 62 -99 SPO 1997 10 28 14 12 78 4.4 -9 670.30 -55.5 -52.2 -54.3 62 -99 SPO 1997 10 28 14 13 79 4.5 -9 670.30 -55.5 -52.2 -54.3 62 -99 SPO 1997 10 28 14 14 80 4.6 -9 670.20 -55.5 -52.2 -54.4 63 -99 SPO 1997 10 28 14 15 78 4.7 -9 670.20 -55.5 -52.3 -54.4 63 -99 SPO 1997 10 28 14 16 78 4.7 -9 670.20 -55.5 -52.2 -54.5 64 -99 SPO 1997 10 28 14 17 77 4.9 -9 670.20 -55.5 -52.1 -54.6 64 -99 SPO 1997 10 28 14 18 77 5.0 -9 670.20 -55.5 -52.0 -54.6 64 -99 SPO 1997 10 28 14 19 78 5.2 -9 670.10 -55.5 -51.9 -54.7 64 -99 SPO 1997 10 28 14 20 79 5.3 -9 670.10 -55.4 -51.9 -54.7 63 -99 SPO 1997 10 28 14 21 78 5.3 -9 670.10 -55.5 -51.8 -54.7 64 -99 SPO 1997 10 28 14 22 77 5.3 -9 670.10 -55.5 -51.8 -54.7 65 -99 SPO 1997 10 28 14 23 75 5.3 -9 670.10 -55.4 -51.8 -54.8 64 -99 SPO 1997 10 28 14 24 76 5.2 -9 670.10 -55.4 -51.8 -54.7 63 -99 SPO 1997 10 28 14 25 76 5.2 -9 670.10 -55.4 -51.7 -54.7 62 -99 SPO 1997 10 28 14 26 75 5.2 -9 670.10 -55.2 -51.8 -54.7 61 -99 SPO 1997 10 28 14 27 74 5.2 -9 670.10 -55.2 -51.8 -54.8 61 -99 SPO 1997 10 28 14 28 74 5.2 -9 670.10 -55.2 -51.8 -54.8 61 -99 SPO 1997 10 28 14 29 74 5.4 -9 670.10 -55.4 -51.8 -54.8 63 -99 SPO 1997 10 28 14 30 73 5.5 -9 670.10 -55.4 -51.8 -54.9 63 -99 SPO 1997 10 28 14 31 74 5.4 -9 670.10 -55.2 -51.8 -54.8 62 -99 SPO 1997 10 28 14 32 74 5.3 -9 670.10 -55.4 -51.8 -54.8 64 -99 SPO 1997 10 28 14 33 74 5.2 -9 670.10 -55.4 -51.8 -54.9 65 -99 SPO 1997 10 28 14 34 72 5.2 -9 670.10 -55.5 -51.9 -54.9 65 -99 SPO 1997 10 28 14 35 72 5.2 -9 670.10 -55.4 -51.9 -54.9 64 -99 SPO 1997 10 28 14 36 72 5.3 -9 670.00 -55.4 -51.9 -54.9 64 -99 SPO 1997 10 28 14 37 71 5.4 -9 670.00 -55.2 -51.9 -54.9 62 -99 SPO 1997 10 28 14 38 72 5.5 -9 670.00 -55.2 -51.9 -54.8 62 -99 SPO 1997 10 28 14 39 72 5.5 -9 670.00 -55.2 -51.9 -54.8 62 -99 SPO 1997 10 28 14 40 73 5.6 -9 670.00 -55.2 -51.9 -54.7 62 -99 SPO 1997 10 28 14 41 73 5.5 -9 670.00 -55.0 -52.0 -54.7 61 -99 SPO 1997 10 28 14 42 74 5.4 -9 670.00 -55.0 -52.0 -54.7 62 -99 SPO 1997 10 28 14 43 74 5.4 -9 670.00 -55.0 -52.0 -54.6 62 -99 SPO 1997 10 28 14 44 74 5.3 -9 670.00 -55.0 -52.0 -54.7 62 -99 SPO 1997 10 28 14 45 75 5.2 -9 670.00 -55.0 -52.1 -54.6 62 -99 SPO 1997 10 28 14 46 73 5.0 -9 670.00 -55.0 -52.1 -54.6 63 -99 SPO 1997 10 28 14 47 74 5.0 -9 670.00 -55.0 -52.1 -54.6 63 -99 SPO 1997 10 28 14 48 74 4.8 -9 670.00 -55.0 -52.2 -54.6 62 -99 SPO 1997 10 28 14 49 74 4.7 -9 670.00 -55.0 -52.2 -54.5 62 -99 SPO 1997 10 28 14 50 74 4.3 -9 670.10 -55.0 -52.2 -54.5 62 -99 SPO 1997 10 28 14 51 74 4.1 -9 670.10 -55.0 -52.3 -54.4 62 -99 SPO 1997 10 28 14 52 74 3.6 -9 670.10 -55.0 -52.4 -54.4 62 -99 SPO 1997 10 28 14 53 74 3.6 -9 670.10 -55.0 -52.5 -54.3 62 -99 SPO 1997 10 28 14 54 74 3.6 -9 670.10 -55.0 -52.5 -54.2 62 -99 SPO 1997 10 28 14 55 76 3.4 -9 670.00 -55.0 -52.6 -54.1 62 -99 SPO 1997 10 28 14 56 74 3.2 -9 670.00 -55.0 -52.7 -54.1 63 -99 SPO 1997 10 28 14 57 76 3.3 -9 670.00 -55.0 -52.8 -54.0 63 -99 SPO 1997 10 28 14 58 77 3.5 -9 670.00 -55.0 -52.7 -54.0 63 -99 SPO 1997 10 28 14 59 78 3.7 -9 670.00 -55.0 -52.6 -54.0 64 -99 SPO 1997 10 28 15 00 79 3.8 -9 670.00 -55.0 -52.6 -54.0 64 0 SPO 1997 10 28 15 01 79 3.8 -9 670.00 -55.0 -52.5 -53.9 64 -99 SPO 1997 10 28 15 02 80 3.8 -9 670.00 -55.0 -52.5 -54.0 64 -99 SPO 1997 10 28 15 03 81 3.7 -9 670.00 -55.0 -52.6 -53.9 64 -99 SPO 1997 10 28 15 04 82 3.8 -9 670.00 -55.0 -52.5 -53.9 64 -99 SPO 1997 10 28 15 05 83 4.0 -9 670.00 -55.0 -52.5 -53.8 63 -99 SPO 1997 10 28 15 06 84 4.0 -9 670.00 -55.0 -52.5 -53.8 62 -99 SPO 1997 10 28 15 07 82 4.2 -9 670.00 -55.0 -52.4 -53.9 62 -99 SPO 1997 10 28 15 08 81 4.1 -9 670.00 -55.0 -52.4 -54.0 62 -99 SPO 1997 10 28 15 09 80 4.5 -9 670.00 -55.0 -52.3 -54.0 62 -99 SPO 1997 10 28 15 10 80 4.7 -9 670.00 -55.0 -52.3 -54.1 62 -99 SPO 1997 10 28 15 11 80 4.7 -9 670.00 -55.0 -52.3 -54.1 62 -99 SPO 1997 10 28 15 12 80 4.6 -9 670.00 -55.0 -52.3 -54.1 63 -99 SPO 1997 10 28 15 13 81 4.3 -9 670.00 -55.0 -52.3 -54.0 64 -99 SPO 1997 10 28 15 14 82 4.4 -9 670.00 -55.0 -52.3 -54.0 64 -99 SPO 1997 10 28 15 15 82 4.2 -9 670.00 -55.0 -52.3 -53.9 64 -99 SPO 1997 10 28 15 16 82 4.1 -9 670.00 -55.0 -52.3 -53.9 64 -99 SPO 1997 10 28 15 17 82 4.0 -9 670.00 -55.0 -52.3 -53.9 63 -99 SPO 1997 10 28 15 18 82 4.0 -9 670.00 -55.0 -52.4 -53.9 63 -99 SPO 1997 10 28 15 19 82 4.0 -9 670.00 -55.0 -52.4 -53.9 63 -99 SPO 1997 10 28 15 20 82 4.1 -9 670.00 -55.0 -52.5 -53.9 63 -99 SPO 1997 10 28 15 21 83 4.2 -9 669.90 -55.0 -52.5 -53.9 62 -99 SPO 1997 10 28 15 22 84 4.2 -9 669.90 -55.0 -52.5 -53.9 62 -99 SPO 1997 10 28 15 23 85 4.2 -9 669.90 -55.0 -52.4 -53.9 62 -99 SPO 1997 10 28 15 24 85 4.3 -9 669.90 -55.0 -52.5 -53.9 62 -99 SPO 1997 10 28 15 25 85 4.3 -9 669.90 -55.0 -52.5 -53.9 62 -99 SPO 1997 10 28 15 26 85 4.3 -9 669.90 -55.0 -52.5 -53.8 62 -99 SPO 1997 10 28 15 27 86 4.1 -9 669.90 -55.0 -52.6 -53.8 62 -99 SPO 1997 10 28 15 28 85 4.0 -9 670.00 -55.0 -52.6 -53.8 62 -99 SPO 1997 10 28 15 29 86 4.0 -9 670.00 -55.0 -52.8 -53.8 63 -99 SPO 1997 10 28 15 30 86 4.0 -9 670.00 -55.0 -52.8 -53.8 63 -99 SPO 1997 10 28 15 31 85 3.9 -9 670.00 -55.0 -52.9 -53.8 63 -99 SPO 1997 10 28 15 32 84 4.0 -9 670.00 -55.0 -52.9 -53.8 63 -99 SPO 1997 10 28 15 33 81 4.2 -9 670.00 -55.0 -52.8 -53.9 63 -99 SPO 1997 10 28 15 34 81 4.4 -9 670.00 -55.0 -52.8 -54.0 63 -99 SPO 1997 10 28 15 35 80 4.3 -9 670.00 -55.0 -52.7 -54.1 63 -99 SPO 1997 10 28 15 36 80 4.2 -9 670.00 -55.0 -52.7 -54.1 62 -99 SPO 1997 10 28 15 37 81 4.2 -9 670.00 -55.0 -52.7 -54.1 62 -99 SPO 1997 10 28 15 38 82 4.2 -9 670.00 -55.0 -52.7 -54.0 62 -99 SPO 1997 10 28 15 39 83 4.1 -9 670.00 -55.0 -52.7 -54.0 62 -99 SPO 1997 10 28 15 40 83 4.1 -9 670.00 -55.0 -52.7 -53.9 62 -99 SPO 1997 10 28 15 41 82 4.1 -9 670.00 -55.2 -52.7 -54.0 63 -99 SPO 1997 10 28 15 42 83 4.3 -9 670.00 -55.2 -52.7 -54.1 63 -99 SPO 1997 10 28 15 43 83 4.5 -9 670.00 -55.2 -52.6 -54.1 63 -99 SPO 1997 10 28 15 44 82 4.5 -9 670.00 -55.2 -52.6 -54.1 63 -99 SPO 1997 10 28 15 45 81 4.4 -9 670.00 -55.2 -52.6 -54.2 63 -99 SPO 1997 10 28 15 46 81 4.2 -9 670.00 -55.2 -52.6 -54.2 63 -99 SPO 1997 10 28 15 47 80 4.0 -9 670.00 -55.2 -52.6 -54.2 63 -99 SPO 1997 10 28 15 48 80 3.8 -9 670.00 -55.2 -52.7 -54.2 63 -99 SPO 1997 10 28 15 49 79 3.8 -9 670.00 -55.2 -52.8 -54.2 63 -99 SPO 1997 10 28 15 50 78 4.0 -9 670.00 -55.4 -52.8 -54.2 64 -99 SPO 1997 10 28 15 51 78 4.2 -9 670.00 -55.4 -52.8 -54.3 63 -99 SPO 1997 10 28 15 52 78 4.3 -9 670.00 -55.4 -52.7 -54.3 63 -99 SPO 1997 10 28 15 53 79 4.3 -9 670.00 -55.4 -52.7 -54.3 62 -99 SPO 1997 10 28 15 54 80 4.4 -9 670.00 -55.5 -52.7 -54.2 63 -99 SPO 1997 10 28 15 55 80 4.5 -9 670.00 -55.5 -52.7 -54.2 64 -99 SPO 1997 10 28 15 56 80 4.7 -9 670.00 -55.5 -52.7 -54.3 64 -99 SPO 1997 10 28 15 57 79 4.8 -9 670.00 -55.5 -52.7 -54.4 64 -99 SPO 1997 10 28 15 58 78 4.8 -9 669.90 -55.5 -52.6 -54.4 64 -99 SPO 1997 10 28 15 59 77 4.9 -9 669.90 -55.5 -52.6 -54.5 63 -99 SPO 1997 10 28 16 00 76 5.0 -9 669.90 -55.5 -52.6 -54.6 63 0 SPO 1997 10 28 16 01 76 5.0 -9 669.90 -55.5 -52.5 -54.6 63 -99 SPO 1997 10 28 16 02 77 5.0 -9 669.90 -55.5 -52.4 -54.5 63 -99 SPO 1997 10 28 16 03 78 5.0 -9 669.90 -55.4 -52.4 -54.5 62 -99 SPO 1997 10 28 16 04 78 5.0 -9 669.90 -55.2 -52.3 -54.5 61 -99 SPO 1997 10 28 16 05 78 5.1 -9 669.90 -55.2 -52.3 -54.5 61 -99 SPO 1997 10 28 16 06 78 5.3 -9 669.90 -55.2 -52.2 -54.4 61 -99 SPO 1997 10 28 16 07 78 5.5 -9 669.80 -55.2 -52.2 -54.4 61 -99 SPO 1997 10 28 16 08 77 5.6 -9 669.80 -55.2 -52.2 -54.4 62 -99 SPO 1997 10 28 16 09 76 5.6 -9 669.80 -55.0 -52.2 -54.4 61 -99 SPO 1997 10 28 16 10 76 5.7 -9 669.80 -55.0 -52.1 -54.4 62 -99 SPO 1997 10 28 16 11 76 5.7 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 12 75 5.5 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 13 76 5.4 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 14 76 5.3 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 15 76 5.3 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 16 77 5.2 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 17 77 5.3 -9 669.80 -55.0 -52.0 -54.4 63 -99 SPO 1997 10 28 16 18 76 5.3 -9 669.80 -55.0 -52.0 -54.4 62 -99 SPO 1997 10 28 16 19 76 5.2 -9 669.80 -55.0 -52.0 -54.4 62 -99 SPO 1997 10 28 16 20 76 5.2 -9 669.80 -55.0 -52.0 -54.4 62 -99 SPO 1997 10 28 16 21 77 5.1 -9 669.80 -55.0 -52.0 -54.4 62 -99 SPO 1997 10 28 16 22 78 5.1 -9 669.80 -55.2 -52.0 -54.4 64 -99 SPO 1997 10 28 16 23 78 5.0 -9 669.80 -55.2 -52.0 -54.4 63 -99 SPO 1997 10 28 16 24 77 5.0 -9 669.80 -55.2 -52.1 -54.4 63 -99 SPO 1997 10 28 16 25 76 5.2 -9 669.80 -55.2 -52.0 -54.5 62 -99 SPO 1997 10 28 16 26 77 5.3 -9 669.70 -55.2 -52.0 -54.5 62 -99 SPO 1997 10 28 16 27 76 5.4 -9 669.80 -55.2 -52.0 -54.5 62 -99 SPO 1997 10 28 16 28 76 5.3 -9 669.80 -55.2 -52.0 -54.5 62 -99 SPO 1997 10 28 16 29 76 5.4 -9 669.80 -55.2 -52.0 -54.5 62 -99 SPO 1997 10 28 16 30 75 5.4 -9 669.80 -55.2 -52.0 -54.6 62 -99 SPO 1997 10 28 16 31 75 5.3 -9 669.80 -55.2 -52.0 -54.6 62 -99 SPO 1997 10 28 16 32 76 5.3 -9 669.80 -55.2 -52.0 -54.6 62 -99 SPO 1997 10 28 16 33 76 5.3 -9 669.80 -55.2 -52.1 -54.6 62 -99 SPO 1997 10 28 16 34 76 5.2 -9 669.80 -55.2 -52.1 -54.6 62 -99 SPO 1997 10 28 16 35 76 5.1 -9 669.80 -55.2 -52.2 -54.6 62 -99 SPO 1997 10 28 16 36 76 5.0 -9 669.80 -55.2 -52.2 -54.6 62 -99 SPO 1997 10 28 16 37 75 5.0 -9 669.80 -55.2 -52.2 -54.6 62 -99 SPO 1997 10 28 16 38 75 5.1 -9 669.80 -55.2 -52.2 -54.6 62 -99 SPO 1997 10 28 16 39 74 5.0 -9 669.80 -55.2 -52.2 -54.6 62 -99 SPO 1997 10 28 16 40 74 5.1 -9 669.80 -55.2 -52.2 -54.7 62 -99 SPO 1997 10 28 16 41 73 5.1 -9 669.80 -55.4 -52.2 -54.7 63 -99 SPO 1997 10 28 16 42 72 5.1 -9 669.80 -55.4 -52.2 -54.8 63 -99 SPO 1997 10 28 16 43 72 5.0 -9 669.80 -55.4 -52.2 -54.8 63 -99 SPO 1997 10 28 16 44 71 4.8 -9 669.80 -55.4 -52.2 -54.8 62 -99 SPO 1997 10 28 16 45 69 4.8 -9 669.80 -55.4 -52.3 -54.8 62 -99 SPO 1997 10 28 16 46 67 5.0 -9 669.80 -55.2 -52.3 -54.8 60 -99 SPO 1997 10 28 16 47 68 5.0 -9 669.80 -55.4 -52.3 -54.7 62 -99 SPO 1997 10 28 16 48 68 4.9 -9 669.80 -55.4 -52.3 -54.8 62 -99 SPO 1997 10 28 16 49 68 4.8 -9 669.80 -55.5 -52.3 -54.8 63 -99 SPO 1997 10 28 16 50 69 5.0 -9 669.80 -55.5 -52.3 -54.8 63 -99 SPO 1997 10 28 16 51 69 5.1 -9 669.80 -55.5 -52.3 -54.8 63 -99 SPO 1997 10 28 16 52 68 4.8 -9 669.80 -55.5 -52.3 -54.7 63 -99 SPO 1997 10 28 16 53 69 4.7 -9 669.80 -55.5 -52.4 -54.7 63 -99 SPO 1997 10 28 16 54 69 4.9 -9 669.80 -55.5 -52.4 -54.7 63 -99 SPO 1997 10 28 16 55 69 4.9 -9 669.70 -55.4 -52.3 -54.8 62 -99 SPO 1997 10 28 16 56 69 4.9 -9 669.80 -55.5 -52.2 -54.8 63 -99 SPO 1997 10 28 16 57 69 4.9 -9 669.80 -55.5 -52.2 -54.8 62 -99 SPO 1997 10 28 16 58 69 4.8 -9 669.70 -55.5 -52.2 -54.7 62 -99 SPO 1997 10 28 16 59 69 4.8 -9 669.80 -55.5 -52.2 -54.8 62 -99 SPO 1997 10 28 17 00 68 4.9 -9 669.80 -55.5 -52.1 -54.8 62 0 SPO 1997 10 28 17 01 68 4.8 -9 669.80 -55.5 -52.1 -54.7 62 -99 SPO 1997 10 28 17 02 68 4.8 -9 669.80 -55.5 -52.0 -54.7 62 -99 SPO 1997 10 28 17 03 67 4.8 -9 669.80 -55.5 -52.0 -54.7 62 -99 SPO 1997 10 28 17 04 67 5.0 -9 669.80 -55.4 -52.0 -54.6 62 -99 SPO 1997 10 28 17 05 66 5.0 -9 669.70 -55.4 -51.8 -54.6 62 -99 SPO 1997 10 28 17 06 65 5.1 -9 669.70 -55.4 -51.6 -54.6 63 -99 SPO 1997 10 28 17 07 64 5.1 -9 669.70 -55.4 -51.5 -54.7 64 -99 SPO 1997 10 28 17 08 65 5.2 -9 669.70 -55.4 -51.4 -54.7 64 -99 SPO 1997 10 28 17 09 65 5.1 -9 669.70 -55.4 -51.4 -54.7 65 -99 SPO 1997 10 28 17 10 64 5.0 -9 669.70 -55.4 -51.4 -54.7 65 -99 SPO 1997 10 28 17 11 65 5.0 -9 669.70 -55.4 -51.4 -54.7 65 -99 SPO 1997 10 28 17 12 65 5.2 -9 669.70 -55.4 -51.4 -54.7 64 -99 SPO 1997 10 28 17 13 65 5.2 -9 669.70 -55.2 -51.4 -54.7 62 -99 SPO 1997 10 28 17 14 64 5.0 -9 669.70 -55.2 -51.4 -54.7 63 -99 SPO 1997 10 28 17 15 65 5.1 -9 669.70 -55.2 -51.4 -54.7 64 -99 SPO 1997 10 28 17 16 65 5.2 -9 669.70 -55.2 -51.5 -54.7 63 -99 SPO 1997 10 28 17 17 65 5.3 -9 669.70 -55.2 -51.5 -54.7 64 -99 SPO 1997 10 28 17 18 64 5.5 -9 669.70 -55.2 -51.4 -54.7 64 -99 SPO 1997 10 28 17 19 64 5.5 -9 669.70 -55.0 -51.4 -54.6 62 -99 SPO 1997 10 28 17 20 64 5.3 -9 669.70 -55.0 -51.4 -54.6 62 -99 SPO 1997 10 28 17 21 63 5.2 -9 669.70 -55.2 -51.4 -54.6 65 -99 SPO 1997 10 28 17 22 62 5.2 -9 669.80 -55.0 -51.4 -54.6 64 -99 SPO 1997 10 28 17 23 61 5.2 -9 669.80 -55.0 -51.5 -54.5 64 -99 SPO 1997 10 28 17 24 61 5.3 -9 669.80 -55.0 -51.5 -54.5 64 -99 SPO 1997 10 28 17 25 62 5.4 -9 669.80 -55.0 -51.4 -54.4 64 -99 SPO 1997 10 28 17 26 62 5.4 -9 669.70 -54.9 -51.4 -54.4 63 -99 SPO 1997 10 28 17 27 62 5.4 -9 669.70 -54.7 -51.4 -54.4 62 -99 SPO 1997 10 28 17 28 62 5.4 -9 669.70 -54.7 -51.4 -54.3 63 -99 SPO 1997 10 28 17 29 62 5.3 -9 669.70 -54.7 -51.4 -54.3 65 -99 SPO 1997 10 28 17 30 62 5.2 -9 669.70 -54.7 -51.4 -54.2 65 -99 SPO 1997 10 28 17 31 61 5.2 -9 669.70 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 17 32 60 5.2 -9 669.70 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 17 33 60 5.2 -9 669.70 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 17 34 60 5.1 -9 669.70 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 17 35 60 5.2 -9 669.70 -54.5 -51.4 -54.2 65 -99 SPO 1997 10 28 17 36 61 5.3 -9 669.70 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 17 37 60 5.3 -9 669.70 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 17 38 59 5.3 -9 669.70 -54.7 -51.3 -54.2 65 -99 SPO 1997 10 28 17 39 58 5.3 -9 669.70 -54.7 -51.3 -54.2 65 -99 SPO 1997 10 28 17 40 57 5.4 -9 669.70 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 17 41 57 5.5 -9 669.70 -54.7 -51.3 -54.2 66 -99 SPO 1997 10 28 17 42 57 5.5 -9 669.70 -54.5 -51.3 -54.2 65 -99 SPO 1997 10 28 17 43 57 5.3 -9 669.70 -54.5 -51.2 -54.1 65 -99 SPO 1997 10 28 17 44 57 5.2 -9 669.70 -54.5 -51.2 -54.1 66 -99 SPO 1997 10 28 17 45 58 5.3 -9 669.70 -54.5 -51.2 -54.1 66 -99 SPO 1997 10 28 17 46 58 5.2 -9 669.70 -54.5 -51.3 -54.1 66 -99 SPO 1997 10 28 17 47 59 5.2 -9 669.70 -54.5 -51.3 -54.1 66 -99 SPO 1997 10 28 17 48 59 5.2 -9 669.70 -54.5 -51.4 -54.1 66 -99 SPO 1997 10 28 17 49 58 5.3 -9 669.70 -54.5 -51.3 -54.1 65 -99 SPO 1997 10 28 17 50 59 5.2 -9 669.70 -54.5 -51.3 -54.0 65 -99 SPO 1997 10 28 17 51 59 5.2 -9 669.70 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 17 52 59 5.1 -9 669.70 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 17 53 59 5.1 -9 669.70 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 17 54 59 5.1 -9 669.70 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 17 55 59 5.2 -9 669.70 -54.5 -51.2 -54.1 64 -99 SPO 1997 10 28 17 56 59 5.1 -9 669.70 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 17 57 58 5.1 -9 669.70 -54.5 -51.4 -54.1 64 -99 SPO 1997 10 28 17 58 58 5.0 -9 669.70 -54.5 -51.4 -54.1 64 -99 SPO 1997 10 28 17 59 58 4.9 -9 669.70 -54.7 -51.4 -54.1 66 -99 SPO 1997 10 28 18 00 58 5.0 -9 669.70 -54.7 -51.4 -54.1 66 0 SPO 1997 10 28 18 01 58 4.9 -9 669.70 -54.5 -51.5 -54.1 65 -99 SPO 1997 10 28 18 02 58 4.9 -9 669.70 -54.5 -51.4 -54.1 64 -99 SPO 1997 10 28 18 03 59 4.9 -9 669.70 -54.5 -51.4 -54.1 63 -99 SPO 1997 10 28 18 04 60 5.0 -9 669.70 -54.5 -51.5 -54.1 63 -99 SPO 1997 10 28 18 05 61 5.0 -9 669.70 -54.5 -51.5 -54.0 63 -99 SPO 1997 10 28 18 06 60 5.1 -9 669.70 -54.5 -51.4 -54.0 63 -99 SPO 1997 10 28 18 07 59 5.0 -9 669.70 -54.5 -51.4 -54.0 63 -99 SPO 1997 10 28 18 08 59 5.1 -9 669.70 -54.5 -51.5 -54.0 63 -99 SPO 1997 10 28 18 09 60 5.2 -9 669.70 -54.5 -51.4 -54.0 64 -99 SPO 1997 10 28 18 10 61 5.5 -9 669.70 -54.5 -51.4 -54.0 64 -99 SPO 1997 10 28 18 11 62 5.6 -9 669.70 -54.4 -51.3 -54.0 64 -99 SPO 1997 10 28 18 12 62 5.5 -9 669.60 -54.5 -51.4 -54.0 65 -99 SPO 1997 10 28 18 13 63 5.4 -9 669.60 -54.4 -51.5 -53.9 64 -99 SPO 1997 10 28 18 14 63 5.5 -9 669.70 -54.5 -51.4 -54.0 65 -99 SPO 1997 10 28 18 15 63 5.6 -9 669.70 -54.5 -51.5 -54.1 65 -99 SPO 1997 10 28 18 16 62 5.3 -9 669.60 -54.5 -51.5 -54.1 64 -99 SPO 1997 10 28 18 17 63 5.4 -9 669.70 -54.7 -51.5 -54.1 65 -99 SPO 1997 10 28 18 18 62 5.5 -9 669.60 -54.5 -51.5 -54.1 63 -99 SPO 1997 10 28 18 19 63 5.5 -9 669.60 -54.5 -51.3 -54.1 63 -99 SPO 1997 10 28 18 20 64 5.6 -9 669.60 -54.5 -51.3 -54.1 64 -99 SPO 1997 10 28 18 21 63 5.3 -9 669.60 -54.7 -51.6 -54.1 66 -99 SPO 1997 10 28 18 22 64 5.6 -9 669.70 -54.5 -51.4 -54.1 65 -99 SPO 1997 10 28 18 23 64 5.5 -9 669.60 -54.5 -51.4 -54.1 65 -99 SPO 1997 10 28 18 24 64 5.3 -9 669.60 -54.5 -51.5 -54.1 65 -99 SPO 1997 10 28 18 25 65 5.4 -9 669.60 -54.5 -51.5 -54.1 65 -99 SPO 1997 10 28 18 26 65 5.3 -9 669.60 -54.5 -51.5 -54.1 65 -99 SPO 1997 10 28 18 27 64 5.2 -9 669.60 -54.5 -51.7 -54.2 64 -99 SPO 1997 10 28 18 28 66 5.6 -9 669.60 -54.5 -51.4 -54.2 64 -99 SPO 1997 10 28 18 29 65 5.4 -9 669.60 -54.5 -51.5 -54.2 63 -99 SPO 1997 10 28 18 30 67 5.7 -9 669.60 -54.7 -51.5 -54.2 65 -99 SPO 1997 10 28 18 31 65 5.5 -9 669.60 -54.7 -51.5 -54.2 65 -99 SPO 1997 10 28 18 32 64 5.3 -9 669.60 -54.7 -51.6 -54.2 65 -99 SPO 1997 10 28 18 33 64 5.4 -9 669.60 -54.7 -51.7 -54.2 65 -99 SPO 1997 10 28 18 34 64 5.5 -9 669.60 -54.7 -51.5 -54.2 65 -99 SPO 1997 10 28 18 35 63 5.5 -9 669.60 -54.7 -51.4 -54.2 66 -99 SPO 1997 10 28 18 36 62 5.1 -9 669.60 -54.7 -51.2 -54.2 66 -99 SPO 1997 10 28 18 37 63 4.9 -9 669.60 -54.7 -51.6 -54.2 66 -99 SPO 1997 10 28 18 38 65 5.3 -9 669.60 -54.7 -51.8 -54.2 66 -99 SPO 1997 10 28 18 39 65 5.2 -9 669.60 -54.7 -51.7 -54.2 65 -99 SPO 1997 10 28 18 40 66 5.2 -9 669.60 -54.7 -51.8 -54.2 65 -99 SPO 1997 10 28 18 41 67 5.2 -9 669.60 -54.7 -51.7 -54.2 64 -99 SPO 1997 10 28 18 42 67 5.2 -9 669.60 -54.7 -51.8 -54.2 64 -99 SPO 1997 10 28 18 43 68 5.3 -9 669.60 -54.7 -51.7 -54.2 64 -99 SPO 1997 10 28 18 44 68 5.1 -9 669.60 -54.7 -51.8 -54.3 64 -99 SPO 1997 10 28 18 45 69 5.3 -9 669.60 -54.7 -51.9 -54.3 64 -99 SPO 1997 10 28 18 46 69 5.2 -9 669.60 -54.7 -51.8 -54.3 64 -99 SPO 1997 10 28 18 47 70 5.2 -9 669.60 -54.9 -51.8 -54.4 66 -99 SPO 1997 10 28 18 48 69 5.4 -9 669.60 -54.9 -51.9 -54.4 65 -99 SPO 1997 10 28 18 49 66 4.9 -9 669.50 -54.9 -51.8 -54.4 65 -99 SPO 1997 10 28 18 50 68 5.5 -9 669.60 -54.9 -51.6 -54.4 64 -99 SPO 1997 10 28 18 51 65 5.2 -9 669.50 -54.9 -51.6 -54.3 64 -99 SPO 1997 10 28 18 52 66 5.3 -9 669.50 -54.9 -51.1 -54.3 64 -99 SPO 1997 10 28 18 53 65 4.9 -9 669.50 -55.0 -51.5 -54.4 65 -99 SPO 1997 10 28 18 54 67 5.5 -9 669.50 -54.9 -51.4 -54.3 63 -99 SPO 1997 10 28 18 55 66 5.1 -9 669.50 -54.9 -51.6 -54.4 63 -99 SPO 1997 10 28 18 56 69 5.5 -9 669.50 -54.9 -51.5 -54.4 63 -99 SPO 1997 10 28 18 57 66 4.8 -9 669.50 -54.9 -51.8 -54.4 63 -99 SPO 1997 10 28 18 58 69 5.2 -9 669.50 -54.9 -51.8 -54.3 63 -99 SPO 1997 10 28 18 59 69 5.1 -9 669.60 -55.0 -52.0 -54.4 65 -99 SPO 1997 10 28 19 00 69 5.1 -9 669.60 -54.9 -51.7 -54.3 64 0 SPO 1997 10 28 19 01 67 4.8 -9 669.60 -54.9 -52.0 -54.3 64 -99 SPO 1997 10 28 19 02 70 5.6 -9 669.60 -54.9 -52.0 -54.3 64 -99 SPO 1997 10 28 19 03 67 5.2 -9 669.50 -54.9 -51.8 -54.4 65 -99 SPO 1997 10 28 19 04 70 5.6 -9 669.50 -54.9 -52.0 -54.4 65 -99 SPO 1997 10 28 19 05 68 5.2 -9 669.50 -54.9 -51.9 -54.4 65 -99 SPO 1997 10 28 19 06 70 5.6 -9 669.50 -55.0 -52.0 -54.4 65 -99 SPO 1997 10 28 19 07 68 5.2 -9 669.50 -55.0 -52.0 -54.4 64 -99 SPO 1997 10 28 19 08 70 5.6 -9 669.50 -55.0 -52.0 -54.4 64 -99 SPO 1997 10 28 19 09 68 5.5 -9 669.50 -55.0 -52.1 -54.4 64 -99 SPO 1997 10 28 19 10 69 5.7 -9 669.50 -55.0 -52.0 -54.5 64 -99 SPO 1997 10 28 19 11 67 5.3 -9 669.50 -55.0 -52.0 -54.5 64 -99 SPO 1997 10 28 19 12 66 5.2 -9 669.50 -55.0 -52.2 -54.5 64 -99 SPO 1997 10 28 19 13 65 5.1 -9 669.50 -55.0 -52.1 -54.5 64 -99 SPO 1997 10 28 19 14 65 5.2 -9 669.50 -55.0 -52.2 -54.5 64 -99 SPO 1997 10 28 19 15 67 5.5 -9 669.50 -55.0 -52.1 -54.5 63 -99 SPO 1997 10 28 19 16 63 5.0 -9 669.50 -55.0 -52.1 -54.5 63 -99 SPO 1997 10 28 19 17 66 5.7 -9 669.50 -55.0 -52.1 -54.5 63 -99 SPO 1997 10 28 19 18 65 5.5 -9 669.50 -55.0 -51.9 -54.5 63 -99 SPO 1997 10 28 19 19 65 5.6 -9 669.50 -55.0 -51.8 -54.5 62 -99 SPO 1997 10 28 19 20 63 5.3 -9 669.50 -55.0 -51.9 -54.5 62 -99 SPO 1997 10 28 19 21 64 5.6 -9 669.50 -55.0 -51.9 -54.5 62 -99 SPO 1997 10 28 19 22 64 5.5 -9 669.50 -55.0 -52.0 -54.5 62 -99 SPO 1997 10 28 19 23 65 5.6 -9 669.50 -55.0 -51.9 -54.5 63 -99 SPO 1997 10 28 19 24 64 5.6 -9 669.50 -55.0 -51.9 -54.6 64 -99 SPO 1997 10 28 19 25 64 5.5 -9 669.50 -55.0 -51.9 -54.6 64 -99 SPO 1997 10 28 19 26 64 5.5 -9 669.50 -55.0 -51.9 -54.6 64 -99 SPO 1997 10 28 19 27 63 5.3 -9 669.50 -55.0 -51.9 -54.5 64 -99 SPO 1997 10 28 19 28 63 5.3 -9 669.50 -55.0 -52.0 -54.5 64 -99 SPO 1997 10 28 19 29 62 5.4 -9 669.50 -55.0 -52.0 -54.6 64 -99 SPO 1997 10 28 19 30 63 5.4 -9 669.50 -55.0 -51.9 -54.6 64 -99 SPO 1997 10 28 19 31 63 5.4 -9 669.50 -55.0 -51.8 -54.6 64 -99 SPO 1997 10 28 19 32 62 5.3 -9 669.50 -55.0 -51.9 -54.6 63 -99 SPO 1997 10 28 19 33 61 5.3 -9 669.50 -55.2 -51.8 -54.6 65 -99 SPO 1997 10 28 19 34 60 5.3 -9 669.50 -55.2 -51.8 -54.6 65 -99 SPO 1997 10 28 19 35 60 4.7 -9 669.50 -55.2 -51.8 -54.6 65 -99 SPO 1997 10 28 19 36 59 4.7 -9 669.50 -55.2 -51.9 -54.6 64 -99 SPO 1997 10 28 19 37 59 4.8 -9 669.50 -55.2 -51.8 -54.6 64 -99 SPO 1997 10 28 19 38 59 4.8 -9 669.50 -55.2 -51.8 -54.6 64 -99 SPO 1997 10 28 19 39 59 4.8 -9 669.50 -55.2 -51.8 -54.6 65 -99 SPO 1997 10 28 19 40 59 4.9 -9 669.50 -55.2 -51.8 -54.7 65 -99 SPO 1997 10 28 19 41 59 4.8 -9 669.50 -55.2 -51.8 -54.6 65 -99 SPO 1997 10 28 19 42 60 4.7 -9 669.50 -55.2 -51.9 -54.6 64 -99 SPO 1997 10 28 19 43 62 4.9 -9 669.50 -55.2 -51.8 -54.6 64 -99 SPO 1997 10 28 19 44 62 5.2 -9 669.50 -55.2 -51.6 -54.6 63 -99 SPO 1997 10 28 19 45 60 4.5 -9 669.50 -55.2 -51.7 -54.6 63 -99 SPO 1997 10 28 19 46 61 4.4 -9 669.50 -55.2 -52.0 -54.6 64 -99 SPO 1997 10 28 19 47 63 4.5 -9 669.50 -55.2 -52.0 -54.6 64 -99 SPO 1997 10 28 19 48 62 4.3 -9 669.50 -55.4 -52.0 -54.6 65 -99 SPO 1997 10 28 19 49 64 4.4 -9 669.60 -55.4 -52.0 -54.6 65 -99 SPO 1997 10 28 19 50 63 4.1 -9 669.60 -55.4 -51.9 -54.6 65 -99 SPO 1997 10 28 19 51 62 4.0 -9 669.60 -55.4 -52.1 -54.6 65 -99 SPO 1997 10 28 19 52 65 4.2 -9 669.60 -55.2 -52.0 -54.6 64 -99 SPO 1997 10 28 19 53 64 4.0 -9 669.60 -55.2 -51.8 -54.5 64 -99 SPO 1997 10 28 19 54 63 3.7 -9 669.60 -55.2 -52.0 -54.5 64 -99 SPO 1997 10 28 19 55 64 3.7 -9 669.60 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 28 19 56 65 3.5 -9 669.60 -55.2 -52.3 -54.4 64 -99 SPO 1997 10 28 19 57 66 3.2 -9 669.60 -55.2 -52.6 -54.4 64 -99 SPO 1997 10 28 19 58 69 3.6 -9 669.60 -55.2 -52.6 -54.4 64 -99 SPO 1997 10 28 19 59 66 3.6 -9 669.60 -55.2 -52.5 -54.4 64 -99 SPO 1997 10 28 20 00 68 3.5 -9 669.60 -55.4 -52.5 -54.4 65 0 SPO 1997 10 28 20 01 68 3.5 -9 669.60 -55.4 -52.5 -54.4 65 -99 SPO 1997 10 28 20 02 63 2.8 -9 669.60 -55.5 -52.8 -54.4 66 -99 SPO 1997 10 28 20 03 70 3.9 -9 669.60 -55.5 -53.0 -54.4 66 -99 SPO 1997 10 28 20 04 69 3.9 -9 669.60 -55.5 -52.7 -54.3 66 -99 SPO 1997 10 28 20 05 66 3.5 -9 669.60 -55.5 -52.7 -54.5 66 -99 SPO 1997 10 28 20 06 70 3.8 -9 669.60 -55.5 -52.7 -54.6 66 -99 SPO 1997 10 28 20 07 70 4.1 -9 669.60 -55.7 -52.6 -54.6 68 -99 SPO 1997 10 28 20 08 71 4.3 -9 669.60 -55.5 -52.4 -54.5 66 -99 SPO 1997 10 28 20 09 70 4.3 -9 669.60 -55.5 -52.4 -54.6 66 -99 SPO 1997 10 28 20 10 70 4.4 -9 669.60 -55.5 -52.4 -54.6 66 -99 SPO 1997 10 28 20 11 70 4.3 -9 669.60 -55.5 -52.4 -54.7 66 -99 SPO 1997 10 28 20 12 69 4.4 -9 669.60 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 13 69 4.6 -9 669.60 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 14 69 4.9 -9 669.60 -55.5 -52.3 -54.8 65 -99 SPO 1997 10 28 20 15 69 4.9 -9 669.60 -55.5 -52.2 -54.8 65 -99 SPO 1997 10 28 20 16 69 5.0 -9 669.60 -55.5 -52.1 -54.8 65 -99 SPO 1997 10 28 20 17 69 4.9 -9 669.60 -55.5 -52.1 -54.8 66 -99 SPO 1997 10 28 20 18 69 4.8 -9 669.60 -55.5 -52.2 -54.8 66 -99 SPO 1997 10 28 20 19 70 5.0 -9 669.50 -55.5 -52.2 -54.8 66 -99 SPO 1997 10 28 20 20 69 4.9 -9 669.50 -55.5 -52.2 -54.8 65 -99 SPO 1997 10 28 20 21 68 5.0 -9 669.50 -55.5 -52.3 -54.8 65 -99 SPO 1997 10 28 20 22 68 5.1 -9 669.50 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 23 68 5.1 -9 669.50 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 24 69 5.2 -9 669.50 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 25 69 5.1 -9 669.50 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 26 70 5.1 -9 669.50 -55.5 -52.4 -54.9 65 -99 SPO 1997 10 28 20 27 70 5.1 -9 669.50 -55.5 -52.4 -54.8 65 -99 SPO 1997 10 28 20 28 70 5.1 -9 669.50 -55.5 -52.4 -54.8 66 -99 SPO 1997 10 28 20 29 69 5.0 -9 669.50 -55.4 -52.4 -54.8 65 -99 SPO 1997 10 28 20 30 69 4.9 -9 669.50 -55.4 -52.3 -54.7 65 -99 SPO 1997 10 28 20 31 70 5.0 -9 669.50 -55.2 -52.3 -54.7 65 -99 SPO 1997 10 28 20 32 70 4.9 -9 669.50 -55.2 -52.3 -54.7 65 -99 SPO 1997 10 28 20 33 70 4.8 -9 669.50 -55.2 -52.3 -54.7 65 -99 SPO 1997 10 28 20 34 70 4.9 -9 669.50 -55.2 -52.4 -54.7 66 -99 SPO 1997 10 28 20 35 70 4.9 -9 669.50 -55.2 -52.3 -54.7 66 -99 SPO 1997 10 28 20 36 70 4.8 -9 669.50 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 28 20 37 71 4.9 -9 669.50 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 28 20 38 71 4.9 -9 669.50 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 28 20 39 71 4.9 -9 669.50 -55.2 -52.4 -54.6 65 -99 SPO 1997 10 28 20 40 71 4.8 -9 669.50 -55.2 -52.4 -54.6 66 -99 SPO 1997 10 28 20 41 71 4.7 -9 669.50 -55.2 -52.4 -54.6 66 -99 SPO 1997 10 28 20 42 71 4.6 -9 669.50 -55.2 -52.5 -54.6 66 -99 SPO 1997 10 28 20 43 72 4.5 -9 669.50 -55.2 -52.5 -54.6 66 -99 SPO 1997 10 28 20 44 72 4.5 -9 669.50 -55.2 -52.5 -54.6 66 -99 SPO 1997 10 28 20 45 71 4.4 -9 669.50 -55.2 -52.5 -54.6 66 -99 SPO 1997 10 28 20 46 71 4.5 -9 669.50 -55.2 -52.5 -54.6 66 -99 SPO 1997 10 28 20 47 70 4.3 -9 669.50 -55.4 -52.6 -54.6 67 -99 SPO 1997 10 28 20 48 71 4.5 -9 669.50 -55.2 -52.6 -54.6 66 -99 SPO 1997 10 28 20 49 71 4.5 -9 669.50 -55.2 -52.5 -54.6 65 -99 SPO 1997 10 28 20 50 71 4.4 -9 669.50 -55.2 -52.4 -54.6 65 -99 SPO 1997 10 28 20 51 71 4.4 -9 669.50 -55.2 -52.4 -54.6 65 -99 SPO 1997 10 28 20 52 71 4.5 -9 669.50 -55.2 -52.4 -54.6 64 -99 SPO 1997 10 28 20 53 71 4.4 -9 669.50 -55.4 -52.4 -54.6 66 -99 SPO 1997 10 28 20 54 72 4.5 -9 669.50 -55.2 -52.4 -54.6 65 -99 SPO 1997 10 28 20 55 73 4.4 -9 669.50 -55.2 -52.4 -54.6 65 -99 SPO 1997 10 28 20 56 71 4.5 -9 669.50 -55.4 -52.4 -54.6 66 -99 SPO 1997 10 28 20 57 71 4.5 -9 669.50 -55.4 -52.4 -54.6 66 -99 SPO 1997 10 28 20 58 69 4.4 -9 669.40 -55.4 -52.4 -54.6 66 -99 SPO 1997 10 28 20 59 69 4.5 -9 669.40 -55.4 -52.4 -54.6 66 -99 SPO 1997 10 28 21 00 67 4.5 -9 669.40 -55.4 -52.4 -54.7 67 0 SPO 1997 10 28 21 01 67 4.4 -9 669.40 -55.4 -52.4 -54.7 66 -99 SPO 1997 10 28 21 02 67 4.5 -9 669.40 -55.4 -52.4 -54.7 65 -99 SPO 1997 10 28 21 03 67 4.5 -9 669.40 -55.4 -52.4 -54.7 65 -99 SPO 1997 10 28 21 04 67 4.5 -9 669.40 -55.4 -52.3 -54.7 65 -99 SPO 1997 10 28 21 05 67 4.6 -9 669.40 -55.4 -52.2 -54.7 65 -99 SPO 1997 10 28 21 06 67 4.6 -9 669.40 -55.4 -52.2 -54.7 65 -99 SPO 1997 10 28 21 07 67 4.6 -9 669.40 -55.2 -52.2 -54.7 63 -99 SPO 1997 10 28 21 08 67 4.6 -9 669.40 -55.2 -52.2 -54.7 63 -99 SPO 1997 10 28 21 09 66 4.6 -9 669.40 -55.4 -52.1 -54.7 65 -99 SPO 1997 10 28 21 10 65 4.7 -9 669.40 -55.4 -52.1 -54.7 65 -99 SPO 1997 10 28 21 11 64 4.8 -9 669.40 -55.2 -52.1 -54.7 64 -99 SPO 1997 10 28 21 12 64 4.9 -9 669.40 -55.2 -52.0 -54.7 65 -99 SPO 1997 10 28 21 13 63 5.0 -9 669.40 -55.2 -52.0 -54.7 65 -99 SPO 1997 10 28 21 14 63 5.0 -9 669.40 -55.2 -52.0 -54.7 64 -99 SPO 1997 10 28 21 15 61 5.2 -9 669.40 -55.2 -52.0 -54.7 64 -99 SPO 1997 10 28 21 16 61 5.2 -9 669.40 -55.2 -52.0 -54.6 64 -99 SPO 1997 10 28 21 17 61 5.1 -9 669.40 -55.2 -52.0 -54.6 64 -99 SPO 1997 10 28 21 18 60 5.2 -9 669.40 -55.2 -52.0 -54.6 65 -99 SPO 1997 10 28 21 19 -999 -99.9 -9 669.40 -55.0 -52.0 -54.5 66 -99 SPO 1997 10 28 21 20 59 5.1 -9 669.30 -55.0 -52.1 -54.5 66 -99 SPO 1997 10 28 21 21 59 5.0 -9 669.30 -55.0 -52.1 -54.5 66 -99 SPO 1997 10 28 21 22 59 5.0 -9 669.30 -55.0 -52.0 -54.5 66 -99 SPO 1997 10 28 21 23 59 5.2 -9 669.30 -55.0 -52.0 -54.4 67 -99 SPO 1997 10 28 21 24 61 5.3 -9 669.40 -54.9 -51.8 -54.5 66 -99 SPO 1997 10 28 21 25 60 5.2 -9 669.30 -54.9 -51.6 -54.5 66 -99 SPO 1997 10 28 21 26 58 5.0 -9 669.30 -54.9 -51.6 -54.5 66 -99 SPO 1997 10 28 21 27 58 5.1 -9 669.40 -54.9 -51.5 -54.5 66 -99 SPO 1997 10 28 21 28 58 5.1 -9 669.30 -54.7 -51.5 -54.4 64 -99 SPO 1997 10 28 21 29 58 5.0 -9 669.30 -54.7 -51.5 -54.5 64 -99 SPO 1997 10 28 21 30 58 5.1 -9 669.30 -54.7 -51.6 -54.5 65 -99 SPO 1997 10 28 21 31 58 5.1 -9 669.30 -54.7 -51.5 -54.5 65 -99 SPO 1997 10 28 21 32 59 5.2 -9 669.30 -54.7 -51.5 -54.5 65 -99 SPO 1997 10 28 21 33 60 5.2 -9 669.30 -54.9 -51.5 -54.5 66 -99 SPO 1997 10 28 21 34 60 5.2 -9 669.30 -54.9 -51.6 -54.5 66 -99 SPO 1997 10 28 21 35 61 5.3 -9 669.30 -54.9 -51.8 -54.5 66 -99 SPO 1997 10 28 21 36 60 5.2 -9 669.30 -55.0 -51.8 -54.5 67 -99 SPO 1997 10 28 21 37 60 5.2 -9 669.30 -55.0 -51.9 -54.6 67 -99 SPO 1997 10 28 21 38 60 5.2 -9 669.30 -55.0 -51.9 -54.6 67 -99 SPO 1997 10 28 21 39 59 5.3 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 40 60 5.3 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 41 59 5.2 -9 669.30 -55.0 -52.0 -54.6 66 -99 SPO 1997 10 28 21 42 59 5.1 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 43 59 5.0 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 44 59 4.9 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 45 60 5.1 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 46 60 5.1 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 47 61 5.0 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 48 61 5.1 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 49 61 5.0 -9 669.30 -55.0 -51.9 -54.6 66 -99 SPO 1997 10 28 21 50 61 4.9 -9 669.30 -54.5 -52.0 -54.6 63 -99 SPO 1997 10 28 21 51 62 5.0 -9 669.30 -54.5 -52.0 -54.6 63 -99 SPO 1997 10 28 21 52 62 4.9 -9 669.30 -54.6 -52.0 -54.5 63 -99 SPO 1997 10 28 21 53 62 5.0 -9 669.30 -54.6 -52.0 -54.6 63 -99 SPO 1997 10 28 21 54 62 4.8 -9 669.30 -55.0 -52.0 -54.6 66 -99 SPO 1997 10 28 21 55 63 5.0 -9 669.30 -55.0 -52.0 -54.6 66 -99 SPO 1997 10 28 21 56 64 5.0 -9 669.30 -55.0 -51.8 -54.6 66 -99 SPO 1997 10 28 21 57 63 4.9 -9 669.30 -55.0 -51.8 -54.6 67 -99 SPO 1997 10 28 21 58 64 5.0 -9 669.30 -55.0 -51.8 -54.6 67 -99 SPO 1997 10 28 21 59 64 5.0 -9 669.30 -55.0 -51.9 -54.6 67 -99 SPO 1997 10 28 22 00 65 5.2 -9 669.30 -55.0 -51.6 -54.6 67 0 SPO 1997 10 28 22 01 63 4.9 -9 669.30 -55.0 -51.6 -54.6 67 -99 SPO 1997 10 28 22 02 64 5.0 -9 669.30 -55.0 -51.6 -54.6 67 -99 SPO 1997 10 28 22 03 62 4.7 -9 669.30 -55.0 -51.6 -54.5 66 -99 SPO 1997 10 28 22 04 61 4.6 -9 669.30 -55.0 -51.5 -54.5 66 -99 SPO 1997 10 28 22 05 62 4.9 -9 669.30 -55.0 -51.6 -54.5 65 -99 SPO 1997 10 28 22 06 61 4.8 -9 669.30 -55.0 -51.4 -54.4 65 -99 SPO 1997 10 28 22 07 61 4.7 -9 669.30 -55.0 -51.6 -54.4 66 -99 SPO 1997 10 28 22 08 62 4.7 -9 669.30 -55.0 -51.6 -54.4 66 -99 SPO 1997 10 28 22 09 63 4.8 -9 669.30 -55.0 -51.6 -54.4 66 -99 SPO 1997 10 28 22 10 65 4.9 -9 669.40 -55.0 -51.4 -54.4 66 -99 SPO 1997 10 28 22 11 65 4.7 -9 669.30 -55.0 -51.5 -54.4 66 -99 SPO 1997 10 28 22 12 65 4.9 -9 669.30 -55.0 -51.6 -54.5 66 -99 SPO 1997 10 28 22 13 66 4.8 -9 669.30 -55.0 -51.5 -54.5 66 -99 SPO 1997 10 28 22 14 67 4.9 -9 669.30 -55.2 -51.4 -54.5 67 -99 SPO 1997 10 28 22 15 68 4.8 -9 669.30 -55.2 -51.4 -54.5 66 -99 SPO 1997 10 28 22 16 68 4.8 -9 669.30 -55.2 -51.5 -54.6 66 -99 SPO 1997 10 28 22 17 68 4.7 -9 669.30 -55.2 -51.6 -54.6 65 -99 SPO 1997 10 28 22 18 69 4.6 -9 669.30 -55.4 -51.7 -54.6 66 -99 SPO 1997 10 28 22 19 71 4.8 -9 669.30 -55.4 -51.6 -54.7 66 -99 SPO 1997 10 28 22 20 70 4.7 -9 669.30 -55.5 -51.7 -54.7 67 -99 SPO 1997 10 28 22 21 70 4.8 -9 669.30 -55.5 -51.7 -54.7 67 -99 SPO 1997 10 28 22 22 70 4.6 -9 669.30 -55.5 -51.8 -54.7 67 -99 SPO 1997 10 28 22 23 70 4.6 -9 669.30 -55.5 -51.9 -54.7 67 -99 SPO 1997 10 28 22 24 71 4.5 -9 669.30 -55.5 -52.1 -54.7 67 -99 SPO 1997 10 28 22 25 73 4.7 -9 669.30 -55.5 -52.1 -54.6 66 -99 SPO 1997 10 28 22 26 74 4.7 -9 669.30 -55.5 -52.1 -54.6 66 -99 SPO 1997 10 28 22 27 74 4.5 -9 669.30 -55.5 -52.1 -54.6 66 -99 SPO 1997 10 28 22 28 74 4.3 -9 669.30 -55.7 -52.2 -54.6 67 -99 SPO 1997 10 28 22 29 74 4.1 -9 669.30 -55.7 -52.3 -54.6 66 -99 SPO 1997 10 28 22 30 73 4.0 -9 669.30 -55.7 -52.4 -54.7 66 -99 SPO 1997 10 28 22 31 72 4.1 -9 669.30 -55.7 -52.4 -54.8 65 -99 SPO 1997 10 28 22 32 73 4.1 -9 669.30 -55.7 -52.4 -54.8 65 -99 SPO 1997 10 28 22 33 74 4.1 -9 669.30 -55.7 -52.4 -54.8 66 -99 SPO 1997 10 28 22 34 74 4.0 -9 669.30 -55.7 -52.4 -54.8 65 -99 SPO 1997 10 28 22 35 74 4.0 -9 669.30 -55.7 -52.4 -54.8 66 -99 SPO 1997 10 28 22 36 77 4.0 -9 669.40 -55.7 -52.4 -54.8 66 -99 SPO 1997 10 28 22 37 77 3.9 -9 669.30 -55.7 -52.6 -54.8 66 -99 SPO 1997 10 28 22 38 79 3.9 -9 669.30 -55.7 -52.7 -54.8 66 -99 SPO 1997 10 28 22 39 78 4.1 -9 669.30 -55.7 -52.6 -54.8 66 -99 SPO 1997 10 28 22 40 78 4.4 -9 669.30 -55.7 -52.6 -54.8 66 -99 SPO 1997 10 28 22 41 78 4.2 -9 669.30 -55.7 -52.5 -54.8 66 -99 SPO 1997 10 28 22 42 78 3.9 -9 669.30 -55.7 -52.7 -54.8 66 -99 SPO 1997 10 28 22 43 77 3.7 -9 669.30 -55.7 -52.7 -54.8 65 -99 SPO 1997 10 28 22 44 76 3.4 -9 669.30 -56.0 -52.8 -54.8 67 -99 SPO 1997 10 28 22 45 76 3.6 -9 669.30 -55.9 -52.8 -54.8 66 -99 SPO 1997 10 28 22 46 75 3.7 -9 669.30 -56.0 -52.7 -54.9 68 -99 SPO 1997 10 28 22 47 75 3.7 -9 669.30 -55.9 -52.7 -54.9 67 -99 SPO 1997 10 28 22 48 75 3.2 -9 669.30 -55.7 -52.8 -55.0 65 -99 SPO 1997 10 28 22 49 75 3.4 -9 669.30 -55.7 -52.9 -55.0 65 -99 SPO 1997 10 28 22 50 75 3.2 -9 669.30 -55.7 -53.0 -54.9 65 -99 SPO 1997 10 28 22 51 76 3.2 -9 669.30 -55.7 -53.0 -54.8 65 -99 SPO 1997 10 28 22 52 77 3.8 -9 669.40 -55.7 -53.0 -54.6 66 -99 SPO 1997 10 28 22 53 77 4.0 -9 669.30 -55.5 -52.8 -54.4 65 -99 SPO 1997 10 28 22 54 78 3.9 -9 669.30 -55.7 -52.8 -54.5 67 -99 SPO 1997 10 28 22 55 78 3.9 -9 669.40 -55.7 -52.9 -54.5 67 -99 SPO 1997 10 28 22 56 77 4.0 -9 669.30 -55.7 -52.9 -54.6 66 -99 SPO 1997 10 28 22 57 77 4.2 -9 669.40 -55.7 -52.9 -54.6 66 -99 SPO 1997 10 28 22 58 76 4.3 -9 669.40 -55.7 -52.9 -54.7 66 -99 SPO 1997 10 28 22 59 75 4.5 -9 669.40 -55.7 -52.9 -54.8 66 -99 SPO 1997 10 28 23 00 75 4.8 -9 669.40 -55.7 -52.6 -54.9 66 0 SPO 1997 10 28 23 01 74 4.8 -9 669.40 -55.7 -52.6 -54.9 67 -99 SPO 1997 10 28 23 02 74 4.7 -9 669.40 -55.5 -52.6 -54.9 65 -99 SPO 1997 10 28 23 03 74 4.6 -9 669.40 -55.5 -52.6 -54.9 65 -99 SPO 1997 10 28 23 04 73 4.5 -9 669.40 -55.5 -52.5 -54.8 66 -99 SPO 1997 10 28 23 05 74 4.5 -9 669.40 -55.5 -52.4 -54.8 66 -99 SPO 1997 10 28 23 06 74 4.5 -9 669.40 -55.5 -52.4 -54.8 66 -99 SPO 1997 10 28 23 07 74 4.5 -9 669.40 -55.5 -52.4 -54.8 66 -99 SPO 1997 10 28 23 08 74 4.5 -9 669.40 -55.5 -52.3 -54.8 66 -99 SPO 1997 10 28 23 09 76 4.5 -9 669.40 -55.5 -52.3 -54.7 66 -99 SPO 1997 10 28 23 10 76 4.4 -9 669.40 -55.5 -52.5 -54.7 65 -99 SPO 1997 10 28 23 11 77 4.3 -9 669.40 -55.7 -52.5 -54.7 66 -99 SPO 1997 10 28 23 12 77 4.2 -9 669.40 -55.7 -52.6 -54.7 65 -99 SPO 1997 10 28 23 13 77 4.2 -9 669.40 -55.7 -52.5 -54.7 65 -99 SPO 1997 10 28 23 14 77 4.2 -9 669.40 -55.7 -52.5 -54.6 65 -99 SPO 1997 10 28 23 15 77 4.2 -9 669.40 -55.7 -52.5 -54.6 65 -99 SPO 1997 10 28 23 16 77 4.2 -9 669.40 -55.7 -52.5 -54.6 65 -99 SPO 1997 10 28 23 17 77 4.2 -9 669.40 -55.7 -52.5 -54.6 65 -99 SPO 1997 10 28 23 18 76 4.3 -9 669.40 -55.7 -52.5 -54.6 66 -99 SPO 1997 10 28 23 19 76 4.3 -9 669.40 -55.7 -52.5 -54.6 66 -99 SPO 1997 10 28 23 20 76 4.4 -9 669.40 -55.5 -52.5 -54.7 65 -99 SPO 1997 10 28 23 21 76 4.4 -9 669.30 -55.5 -52.4 -54.7 66 -99 SPO 1997 10 28 23 22 76 4.3 -9 669.30 -55.5 -52.4 -54.7 67 -99 SPO 1997 10 28 23 23 75 4.4 -9 669.30 -55.5 -52.4 -54.7 67 -99 SPO 1997 10 28 23 24 74 4.5 -9 669.30 -55.4 -52.3 -54.7 65 -99 SPO 1997 10 28 23 25 73 4.5 -9 669.30 -55.2 -52.3 -54.7 64 -99 SPO 1997 10 28 23 26 72 4.5 -9 669.30 -55.2 -52.3 -54.7 65 -99 SPO 1997 10 28 23 27 72 4.6 -9 669.30 -55.0 -52.3 -54.7 63 -99 SPO 1997 10 28 23 28 70 4.6 -9 669.30 -55.0 -52.3 -54.7 64 -99 SPO 1997 10 28 23 29 70 4.7 -9 669.30 -55.0 -52.2 -54.6 65 -99 SPO 1997 10 28 23 30 68 4.6 -9 669.30 -55.0 -52.2 -54.6 65 -99 SPO 1997 10 28 23 31 67 4.7 -9 669.30 -55.0 -52.2 -54.6 66 -99 SPO 1997 10 28 23 32 66 4.7 -9 669.30 -55.0 -52.2 -54.6 66 -99 SPO 1997 10 28 23 33 64 4.8 -9 669.30 -54.9 -52.0 -54.6 65 -99 SPO 1997 10 28 23 34 63 4.8 -9 669.30 -54.9 -52.0 -54.6 65 -99 SPO 1997 10 28 23 35 64 4.7 -9 669.30 -54.9 -51.9 -54.6 65 -99 SPO 1997 10 28 23 36 63 4.7 -9 669.30 -54.9 -51.9 -54.6 65 -99 SPO 1997 10 28 23 37 64 4.7 -9 669.30 -54.9 -51.8 -54.6 65 -99 SPO 1997 10 28 23 38 64 4.6 -9 669.30 -55.0 -51.8 -54.6 66 -99 SPO 1997 10 28 23 39 64 4.7 -9 669.30 -55.0 -51.8 -54.6 66 -99 SPO 1997 10 28 23 40 64 4.7 -9 669.30 -55.0 -51.8 -54.6 65 -99 SPO 1997 10 28 23 41 64 4.8 -9 669.30 -55.0 -51.7 -54.6 66 -99 SPO 1997 10 28 23 42 64 4.8 -9 669.30 -55.0 -51.6 -54.6 66 -99 SPO 1997 10 28 23 43 64 4.8 -9 669.30 -55.0 -51.6 -54.6 66 -99 SPO 1997 10 28 23 44 64 4.9 -9 669.30 -55.0 -51.5 -54.6 66 -99 SPO 1997 10 28 23 45 64 4.9 -9 669.30 -55.0 -51.5 -54.6 66 -99 SPO 1997 10 28 23 46 63 5.0 -9 669.30 -55.0 -51.2 -54.6 66 -99 SPO 1997 10 28 23 47 63 5.0 -9 669.30 -54.9 -51.5 -54.6 65 -99 SPO 1997 10 28 23 48 63 5.0 -9 669.30 -55.0 -51.7 -54.6 66 -99 SPO 1997 10 28 23 49 63 5.0 -9 669.30 -55.0 -51.6 -54.6 66 -99 SPO 1997 10 28 23 50 62 5.0 -9 669.30 -55.0 -51.5 -54.6 65 -99 SPO 1997 10 28 23 51 63 5.0 -9 669.30 -54.9 -51.6 -54.6 63 -99 SPO 1997 10 28 23 52 63 5.0 -9 669.30 -54.9 -51.6 -54.5 63 -99 SPO 1997 10 28 23 53 63 5.0 -9 669.30 -55.0 -51.6 -54.5 65 -99 SPO 1997 10 28 23 54 62 5.0 -9 669.30 -55.0 -51.7 -54.5 65 -99 SPO 1997 10 28 23 55 62 5.0 -9 669.30 -55.0 -51.8 -54.5 66 -99 SPO 1997 10 28 23 56 62 5.0 -9 669.30 -55.0 -51.7 -54.5 66 -99 SPO 1997 10 28 23 57 63 5.0 -9 669.30 -54.9 -51.7 -54.5 65 -99 SPO 1997 10 28 23 58 62 4.9 -9 669.30 -55.0 -51.7 -54.5 -99 -99 SPO 1997 10 28 23 59 62 5.0 -9 669.20 -55.0 -51.8 -54.5 -99 -99 SPO 1997 10 29 00 00 60 4.7 -9 669.30 -55.0 -51.9 -54.5 -99 0 SPO 1997 10 29 00 01 62 4.9 -9 669.20 -55.0 -51.9 -54.6 -99 -99 SPO 1997 10 29 00 02 63 5.0 -9 669.20 -55.0 -51.8 -54.6 -99 -99 SPO 1997 10 29 00 03 63 5.1 -9 669.20 -55.0 -51.8 -54.6 66 -99 SPO 1997 10 29 00 04 63 5.1 -9 669.20 -55.0 -51.8 -54.6 65 -99 SPO 1997 10 29 00 05 63 5.1 -9 669.20 -55.0 -51.8 -54.6 65 -99 SPO 1997 10 29 00 06 62 5.1 -9 669.20 -55.1 -51.8 -54.6 65 -99 SPO 1997 10 29 00 07 62 5.0 -9 669.20 -55.1 -51.7 -54.6 65 -99 SPO 1997 10 29 00 08 62 5.0 -9 669.20 -55.1 -51.7 -54.6 65 -99 SPO 1997 10 29 00 09 62 5.0 -9 669.20 -55.1 -51.7 -54.6 65 -99 SPO 1997 10 29 00 10 61 5.0 -9 669.20 -55.1 -51.6 -54.6 65 -99 SPO 1997 10 29 00 11 62 5.0 -9 669.20 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 12 62 5.0 -9 669.20 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 13 62 5.1 -9 669.20 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 14 62 5.0 -9 669.10 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 15 62 5.0 -9 669.10 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 16 62 5.0 -9 669.10 -55.2 -51.6 -54.6 66 -99 SPO 1997 10 29 00 17 63 5.0 -9 669.10 -55.2 -51.7 -54.6 66 -99 SPO 1997 10 29 00 18 63 5.0 -9 669.10 -55.2 -51.7 -54.6 65 -99 SPO 1997 10 29 00 19 62 5.0 -9 669.10 -55.2 -51.7 -54.6 65 -99 SPO 1997 10 29 00 20 62 5.0 -9 669.10 -55.2 -51.7 -54.6 65 -99 SPO 1997 10 29 00 21 62 5.0 -9 669.10 -55.2 -51.7 -54.6 65 -99 SPO 1997 10 29 00 22 62 5.0 -9 669.00 -55.1 -51.7 -54.6 65 -99 SPO 1997 10 29 00 23 63 5.0 -9 669.00 -55.1 -51.7 -54.6 65 -99 SPO 1997 10 29 00 24 64 5.1 -9 669.00 -55.1 -51.8 -54.6 65 -99 SPO 1997 10 29 00 25 65 5.2 -9 669.00 -55.1 -51.8 -54.7 65 -99 SPO 1997 10 29 00 26 64 5.2 -9 669.00 -55.2 -51.8 -54.7 66 -99 SPO 1997 10 29 00 27 65 5.2 -9 669.00 -55.1 -51.8 -54.7 65 -99 SPO 1997 10 29 00 28 65 5.1 -9 669.00 -55.1 -51.9 -54.8 65 -99 SPO 1997 10 29 00 29 65 4.9 -9 669.00 -55.2 -51.9 -54.8 65 -99 SPO 1997 10 29 00 30 65 4.8 -9 669.00 -55.2 -52.0 -54.8 64 -99 SPO 1997 10 29 00 31 65 4.8 -9 669.10 -55.2 -52.2 -54.9 64 -99 SPO 1997 10 29 00 32 66 4.9 -9 669.00 -55.2 -52.4 -55.0 63 -99 SPO 1997 10 29 00 33 65 4.9 -9 669.00 -55.2 -52.4 -55.0 64 -99 SPO 1997 10 29 00 34 66 4.8 -9 669.00 -55.3 -52.7 -55.0 65 -99 SPO 1997 10 29 00 35 66 4.9 -9 669.00 -55.3 -52.8 -55.1 65 -99 SPO 1997 10 29 00 36 66 5.0 -9 669.00 -55.4 -52.7 -55.1 65 -99 SPO 1997 10 29 00 37 66 4.9 -9 668.90 -55.4 -52.6 -55.2 65 -99 SPO 1997 10 29 00 38 65 4.9 -9 668.90 -55.4 -52.6 -55.2 65 -99 SPO 1997 10 29 00 39 66 4.9 -9 668.90 -55.4 -52.5 -55.2 65 -99 SPO 1997 10 29 00 40 66 4.9 -9 668.90 -55.4 -52.5 -55.2 64 -99 SPO 1997 10 29 00 41 65 5.0 -9 668.90 -55.4 -52.4 -55.2 64 -99 SPO 1997 10 29 00 42 64 4.9 -9 668.90 -55.4 -52.4 -55.2 64 -99 SPO 1997 10 29 00 43 63 4.7 -9 669.00 -55.4 -52.2 -55.1 63 -99 SPO 1997 10 29 00 44 62 4.6 -9 669.00 -55.4 -52.4 -55.1 62 -99 SPO 1997 10 29 00 45 61 4.5 -9 669.00 -55.4 -52.6 -55.1 62 -99 SPO 1997 10 29 00 46 61 4.5 -9 669.00 -55.3 -52.6 -55.0 62 -99 SPO 1997 10 29 00 47 62 4.5 -9 669.00 -55.4 -52.7 -55.0 64 -99 SPO 1997 10 29 00 48 63 4.5 -9 669.00 -55.3 -52.6 -55.0 63 -99 SPO 1997 10 29 00 49 64 4.5 -9 669.00 -55.4 -52.5 -55.0 65 -99 SPO 1997 10 29 00 50 63 4.5 -9 669.00 -55.4 -52.5 -55.0 65 -99 SPO 1997 10 29 00 51 63 4.6 -9 669.00 -55.4 -52.4 -55.0 65 -99 SPO 1997 10 29 00 52 62 4.7 -9 669.00 -55.4 -52.3 -54.9 65 -99 SPO 1997 10 29 00 53 62 4.8 -9 669.00 -55.3 -52.1 -54.9 65 -99 SPO 1997 10 29 00 54 62 4.7 -9 669.00 -55.3 -52.2 -54.9 65 -99 SPO 1997 10 29 00 55 62 4.7 -9 669.00 -55.3 -52.2 -54.8 65 -99 SPO 1997 10 29 00 56 62 4.6 -9 669.00 -55.3 -52.1 -54.8 65 -99 SPO 1997 10 29 00 57 63 4.7 -9 669.00 -55.2 -52.1 -54.8 63 -99 SPO 1997 10 29 00 58 63 4.7 -9 669.00 -55.2 -52.2 -54.8 63 -99 SPO 1997 10 29 00 59 64 4.7 -9 669.00 -55.2 -52.2 -54.8 62 -99 SPO 1997 10 29 01 00 65 4.8 -9 669.00 -55.2 -52.2 -54.8 63 0 SPO 1997 10 29 01 01 65 5.0 -9 669.00 -55.2 -52.2 -54.8 64 -99 SPO 1997 10 29 01 02 64 5.1 -9 669.00 -55.2 -52.0 -54.8 64 -99 SPO 1997 10 29 01 03 62 5.1 -9 669.00 -55.2 -52.0 -54.8 64 -99 SPO 1997 10 29 01 04 62 5.0 -9 669.00 -55.1 -52.1 -54.7 63 -99 SPO 1997 10 29 01 05 62 5.1 -9 669.00 -55.1 -52.0 -54.7 64 -99 SPO 1997 10 29 01 06 62 5.2 -9 669.00 -55.1 -51.8 -54.7 64 -99 SPO 1997 10 29 01 07 62 5.3 -9 669.00 -55.1 -51.7 -54.7 65 -99 SPO 1997 10 29 01 08 61 5.4 -9 669.00 -55.1 -51.6 -54.6 65 -99 SPO 1997 10 29 01 09 62 5.5 -9 669.00 -55.0 -51.5 -54.6 64 -99 SPO 1997 10 29 01 10 61 5.4 -9 669.00 -55.0 -51.5 -54.6 64 -99 SPO 1997 10 29 01 11 61 5.4 -9 669.00 -55.0 -51.5 -54.6 64 -99 SPO 1997 10 29 01 12 61 5.4 -9 669.00 -55.0 -51.4 -54.6 63 -99 SPO 1997 10 29 01 13 61 5.5 -9 669.00 -55.0 -51.5 -54.6 64 -99 SPO 1997 10 29 01 14 62 5.5 -9 669.00 -55.0 -51.5 -54.6 64 -99 SPO 1997 10 29 01 15 61 5.5 -9 668.90 -55.0 -51.5 -54.6 65 -99 SPO 1997 10 29 01 16 61 5.6 -9 668.90 -54.8 -51.4 -54.6 64 -99 SPO 1997 10 29 01 17 61 5.6 -9 668.90 -54.8 -51.3 -54.6 64 -99 SPO 1997 10 29 01 18 60 5.6 -9 668.90 -54.8 -51.2 -54.6 65 -99 SPO 1997 10 29 01 19 60 5.6 -9 668.90 -54.9 -51.2 -54.6 66 -99 SPO 1997 10 29 01 20 60 5.7 -9 668.90 -54.9 -51.2 -54.6 66 -99 SPO 1997 10 29 01 21 59 5.8 -9 668.90 -54.8 -51.2 -54.5 65 -99 SPO 1997 10 29 01 22 59 5.7 -9 668.90 -54.9 -51.2 -54.5 65 -99 SPO 1997 10 29 01 23 60 5.7 -9 668.90 -54.9 -51.2 -54.5 65 -99 SPO 1997 10 29 01 24 60 5.7 -9 668.90 -54.9 -51.2 -54.5 64 -99 SPO 1997 10 29 01 25 61 5.6 -9 668.90 -54.9 -51.3 -54.5 64 -99 SPO 1997 10 29 01 26 62 5.6 -9 668.90 -54.9 -51.4 -54.6 64 -99 SPO 1997 10 29 01 27 63 5.6 -9 668.90 -54.9 -51.4 -54.6 65 -99 SPO 1997 10 29 01 28 64 5.5 -9 668.90 -54.9 -51.4 -54.6 64 -99 SPO 1997 10 29 01 29 63 5.5 -9 668.90 -54.9 -51.4 -54.6 64 -99 SPO 1997 10 29 01 30 63 5.6 -9 668.90 -55.0 -51.4 -54.6 65 -99 SPO 1997 10 29 01 31 63 5.6 -9 668.90 -55.0 -51.4 -54.6 65 -99 SPO 1997 10 29 01 32 63 5.6 -9 668.90 -55.0 -51.4 -54.6 65 -99 SPO 1997 10 29 01 33 62 5.5 -9 668.90 -54.9 -51.4 -54.6 65 -99 SPO 1997 10 29 01 34 62 5.6 -9 668.90 -54.9 -51.3 -54.6 65 -99 SPO 1997 10 29 01 35 61 5.6 -9 668.90 -54.9 -51.2 -54.6 64 -99 SPO 1997 10 29 01 36 61 5.6 -9 668.90 -54.9 -51.2 -54.6 63 -99 SPO 1997 10 29 01 37 60 5.6 -9 668.90 -54.9 -51.1 -54.6 63 -99 SPO 1997 10 29 01 38 59 5.7 -9 668.90 -54.8 -51.1 -54.6 62 -99 SPO 1997 10 29 01 39 58 5.8 -9 668.80 -54.8 -51.0 -54.5 62 -99 SPO 1997 10 29 01 40 57 5.8 -9 668.80 -54.8 -51.0 -54.5 63 -99 SPO 1997 10 29 01 41 57 5.9 -9 668.80 -54.8 -51.0 -54.5 64 -99 SPO 1997 10 29 01 42 56 5.8 -9 668.80 -54.8 -51.0 -54.5 64 -99 SPO 1997 10 29 01 43 56 5.8 -9 668.80 -54.8 -51.0 -54.4 65 -99 SPO 1997 10 29 01 44 57 5.8 -9 668.80 -54.8 -50.9 -54.5 65 -99 SPO 1997 10 29 01 45 57 5.7 -9 668.80 -54.8 -50.8 -54.4 65 -99 SPO 1997 10 29 01 46 57 5.7 -9 668.80 -54.8 -50.8 -54.4 65 -99 SPO 1997 10 29 01 47 58 5.6 -9 668.80 -54.8 -50.8 -54.4 65 -99 SPO 1997 10 29 01 48 57 5.6 -9 668.80 -54.8 -50.8 -54.5 64 -99 SPO 1997 10 29 01 49 57 5.5 -9 668.80 -54.8 -50.8 -54.5 64 -99 SPO 1997 10 29 01 50 58 5.5 -9 668.80 -54.8 -50.8 -54.5 63 -99 SPO 1997 10 29 01 51 57 5.5 -9 668.80 -54.8 -50.6 -54.5 63 -99 SPO 1997 10 29 01 52 57 5.5 -9 668.80 -54.8 -50.6 -54.5 63 -99 SPO 1997 10 29 01 53 56 5.5 -9 668.80 -54.8 -50.5 -54.4 64 -99 SPO 1997 10 29 01 54 56 5.5 -9 668.80 -54.8 -50.4 -54.4 64 -99 SPO 1997 10 29 01 55 55 5.5 -9 668.80 -54.8 -50.5 -54.4 64 -99 SPO 1997 10 29 01 56 56 5.6 -9 668.80 -54.8 -50.5 -54.4 65 -99 SPO 1997 10 29 01 57 56 5.5 -9 668.80 -54.8 -50.5 -54.4 64 -99 SPO 1997 10 29 01 58 57 5.5 -9 668.80 -54.8 -50.4 -54.4 65 -99 SPO 1997 10 29 01 59 57 5.4 -9 668.80 -54.8 -50.6 -54.4 65 -99 SPO 1997 10 29 02 00 57 5.4 -9 668.80 -54.8 -50.6 -54.4 64 0 SPO 1997 10 29 02 01 57 5.4 -9 668.80 -54.8 -50.6 -54.4 64 -99 SPO 1997 10 29 02 02 58 5.4 -9 668.80 -54.8 -50.7 -54.4 63 -99 SPO 1997 10 29 02 03 59 5.4 -9 668.80 -54.9 -50.6 -54.4 64 -99 SPO 1997 10 29 02 04 59 5.3 -9 668.70 -54.9 -50.6 -54.5 64 -99 SPO 1997 10 29 02 05 59 5.2 -9 668.70 -54.9 -50.5 -54.5 64 -99 SPO 1997 10 29 02 06 59 5.2 -9 668.70 -54.9 -50.6 -54.5 64 -99 SPO 1997 10 29 02 07 59 5.2 -9 668.70 -54.9 -50.6 -54.5 64 -99 SPO 1997 10 29 02 08 59 5.2 -9 668.70 -54.9 -50.4 -54.5 65 -99 SPO 1997 10 29 02 09 58 5.3 -9 668.70 -54.9 -50.0 -54.5 65 -99 SPO 1997 10 29 02 10 57 5.3 -9 668.70 -54.9 -49.8 -54.5 65 -99 SPO 1997 10 29 02 11 57 5.2 -9 668.70 -54.8 -49.5 -54.4 64 -99 SPO 1997 10 29 02 12 57 5.3 -9 668.70 -54.8 -49.5 -54.4 64 -99 SPO 1997 10 29 02 13 57 5.4 -9 668.70 -54.8 -49.6 -54.4 64 -99 SPO 1997 10 29 02 14 59 5.3 -9 668.70 -54.9 -49.6 -54.4 65 -99 SPO 1997 10 29 02 15 62 5.3 -9 668.70 -54.8 -50.0 -54.4 63 -99 SPO 1997 10 29 02 16 63 5.3 -9 668.70 -54.9 -50.3 -54.4 64 -99 SPO 1997 10 29 02 17 63 5.3 -9 668.70 -54.8 -50.6 -54.4 63 -99 SPO 1997 10 29 02 18 65 5.2 -9 668.70 -54.8 -50.8 -54.4 64 -99 SPO 1997 10 29 02 19 65 5.2 -9 668.70 -54.9 -51.0 -54.4 65 -99 SPO 1997 10 29 02 20 64 5.2 -9 668.70 -54.9 -51.0 -54.5 65 -99 SPO 1997 10 29 02 21 64 5.2 -9 668.70 -54.9 -51.0 -54.5 66 -99 SPO 1997 10 29 02 22 64 5.2 -9 668.70 -54.8 -51.0 -54.5 64 -99 SPO 1997 10 29 02 23 64 5.2 -9 668.70 -54.8 -51.0 -54.5 64 -99 SPO 1997 10 29 02 24 64 5.2 -9 668.70 -54.8 -51.1 -54.5 64 -99 SPO 1997 10 29 02 25 64 5.3 -9 668.70 -54.9 -51.2 -54.5 65 -99 SPO 1997 10 29 02 26 64 5.1 -9 668.70 -54.9 -51.3 -54.5 63 -99 SPO 1997 10 29 02 27 64 5.3 -9 668.70 -54.9 -51.5 -54.5 63 -99 SPO 1997 10 29 02 28 64 5.2 -9 668.70 -54.9 -51.6 -54.5 63 -99 SPO 1997 10 29 02 29 63 5.2 -9 668.70 -54.9 -51.6 -54.5 64 -99 SPO 1997 10 29 02 30 63 5.2 -9 668.70 -54.9 -51.6 -54.5 64 -99 SPO 1997 10 29 02 31 63 5.1 -9 668.70 -54.9 -51.5 -54.5 65 -99 SPO 1997 10 29 02 32 63 5.1 -9 668.70 -54.9 -51.5 -54.5 65 -99 SPO 1997 10 29 02 33 63 5.1 -9 668.70 -54.9 -51.4 -54.5 65 -99 SPO 1997 10 29 02 34 62 5.1 -9 668.70 -54.9 -51.3 -54.5 65 -99 SPO 1997 10 29 02 35 62 5.1 -9 668.70 -54.9 -51.4 -54.5 65 -99 SPO 1997 10 29 02 36 62 5.1 -9 668.70 -54.9 -51.4 -54.4 64 -99 SPO 1997 10 29 02 37 62 5.0 -9 668.60 -54.9 -51.4 -54.5 64 -99 SPO 1997 10 29 02 38 62 5.0 -9 668.60 -54.9 -51.4 -54.5 63 -99 SPO 1997 10 29 02 39 61 5.0 -9 668.60 -54.9 -51.4 -54.5 63 -99 SPO 1997 10 29 02 40 61 5.0 -9 668.60 -54.9 -51.4 -54.5 63 -99 SPO 1997 10 29 02 41 62 5.2 -9 668.60 -54.9 -51.4 -54.5 63 -99 SPO 1997 10 29 02 42 61 5.2 -9 668.60 -54.9 -51.5 -54.4 63 -99 SPO 1997 10 29 02 43 61 5.2 -9 668.60 -54.8 -51.5 -54.4 63 -99 SPO 1997 10 29 02 44 61 5.2 -9 668.60 -54.8 -51.5 -54.4 64 -99 SPO 1997 10 29 02 45 62 5.2 -9 668.60 -54.8 -51.5 -54.4 64 -99 SPO 1997 10 29 02 46 62 5.2 -9 668.60 -54.8 -51.4 -54.4 64 -99 SPO 1997 10 29 02 47 63 5.2 -9 668.60 -54.8 -51.5 -54.4 64 -99 SPO 1997 10 29 02 48 63 5.1 -9 668.60 -54.9 -51.6 -54.4 65 -99 SPO 1997 10 29 02 49 63 5.0 -9 668.60 -54.9 -51.5 -54.4 65 -99 SPO 1997 10 29 02 50 63 5.0 -9 668.60 -54.9 -51.6 -54.4 65 -99 SPO 1997 10 29 02 51 64 5.1 -9 668.60 -54.9 -51.7 -54.4 64 -99 SPO 1997 10 29 02 52 64 5.2 -9 668.60 -54.8 -51.7 -54.4 63 -99 SPO 1997 10 29 02 53 63 5.1 -9 668.60 -54.8 -51.6 -54.4 63 -99 SPO 1997 10 29 02 54 63 5.0 -9 668.60 -54.9 -51.6 -54.4 64 -99 SPO 1997 10 29 02 55 63 5.0 -9 668.60 -54.8 -51.6 -54.4 63 -99 SPO 1997 10 29 02 56 63 5.0 -9 668.60 -54.8 -51.6 -54.4 63 -99 SPO 1997 10 29 02 57 63 4.9 -9 668.60 -54.8 -51.7 -54.4 64 -99 SPO 1997 10 29 02 58 63 5.0 -9 668.60 -54.8 -51.7 -54.4 64 -99 SPO 1997 10 29 02 59 64 4.8 -9 668.60 -54.8 -51.7 -54.4 63 -99 SPO 1997 10 29 03 00 64 4.9 -9 668.60 -54.8 -51.7 -54.4 63 0 SPO 1997 10 29 03 01 65 4.8 -9 668.60 -54.9 -51.7 -54.4 64 -99 SPO 1997 10 29 03 02 65 4.8 -9 668.60 -54.9 -51.7 -54.4 64 -99 SPO 1997 10 29 03 03 65 4.7 -9 668.60 -54.9 -51.7 -54.4 64 -99 SPO 1997 10 29 03 04 65 4.8 -9 668.60 -54.9 -51.7 -54.4 63 -99 SPO 1997 10 29 03 05 66 4.8 -9 668.60 -54.9 -51.5 -54.4 63 -99 SPO 1997 10 29 03 06 65 4.5 -9 668.60 -54.9 -51.7 -54.4 63 -99 SPO 1997 10 29 03 07 65 4.4 -9 668.60 -54.9 -51.8 -54.4 63 -99 SPO 1997 10 29 03 08 65 4.4 -9 668.60 -54.9 -51.9 -54.3 64 -99 SPO 1997 10 29 03 09 65 4.1 -9 668.60 -55.0 -52.1 -54.4 65 -99 SPO 1997 10 29 03 10 65 4.1 -9 668.60 -55.0 -52.2 -54.4 66 -99 SPO 1997 10 29 03 11 65 4.0 -9 668.60 -55.0 -52.2 -54.4 66 -99 SPO 1997 10 29 03 12 66 4.1 -9 668.60 -55.0 -52.1 -54.4 66 -99 SPO 1997 10 29 03 13 66 4.1 -9 668.50 -55.0 -52.0 -54.4 66 -99 SPO 1997 10 29 03 14 65 4.2 -9 668.50 -55.0 -52.0 -54.4 65 -99 SPO 1997 10 29 03 15 64 4.2 -9 668.50 -55.0 -52.0 -54.4 64 -99 SPO 1997 10 29 03 16 64 4.1 -9 668.50 -55.0 -51.9 -54.4 64 -99 SPO 1997 10 29 03 17 63 4.0 -9 668.40 -55.1 -52.1 -54.4 64 -99 SPO 1997 10 29 03 18 62 4.0 -9 668.50 -55.1 -52.0 -54.4 64 -99 SPO 1997 10 29 03 19 62 4.0 -9 668.50 -55.1 -51.9 -54.3 65 -99 SPO 1997 10 29 03 20 62 4.0 -9 668.50 -55.0 -51.9 -54.3 64 -99 SPO 1997 10 29 03 21 64 4.1 -9 668.50 -55.0 -51.8 -54.3 64 -99 SPO 1997 10 29 03 22 63 4.2 -9 668.60 -55.0 -51.6 -54.3 64 -99 SPO 1997 10 29 03 23 63 4.2 -9 668.60 -55.0 -51.6 -54.3 65 -99 SPO 1997 10 29 03 24 65 4.1 -9 668.60 -54.9 -51.7 -54.3 64 -99 SPO 1997 10 29 03 25 65 4.1 -9 668.60 -55.0 -51.6 -54.2 66 -99 SPO 1997 10 29 03 26 68 4.1 -9 668.60 -55.0 -51.5 -54.2 65 -99 SPO 1997 10 29 03 27 69 4.1 -9 668.60 -54.9 -51.6 -54.2 64 -99 SPO 1997 10 29 03 28 70 4.2 -9 668.60 -55.0 -51.8 -54.2 64 -99 SPO 1997 10 29 03 29 71 4.1 -9 668.60 -55.0 -52.0 -54.2 64 -99 SPO 1997 10 29 03 30 72 4.0 -9 668.60 -55.1 -52.1 -54.2 64 -99 SPO 1997 10 29 03 31 73 4.0 -9 668.60 -55.1 -52.4 -54.2 63 -99 SPO 1997 10 29 03 32 73 4.1 -9 668.60 -55.1 -52.4 -54.2 64 -99 SPO 1997 10 29 03 33 73 4.2 -9 668.60 -55.2 -52.4 -54.2 66 -99 SPO 1997 10 29 03 34 72 4.3 -9 668.60 -55.3 -52.4 -54.2 66 -99 SPO 1997 10 29 03 35 74 4.3 -9 668.60 -55.2 -52.4 -54.3 66 -99 SPO 1997 10 29 03 36 75 4.4 -9 668.60 -55.3 -52.5 -54.2 66 -99 SPO 1997 10 29 03 37 75 4.3 -9 668.60 -55.3 -52.5 -54.3 66 -99 SPO 1997 10 29 03 38 75 4.5 -9 668.60 -55.3 -52.4 -54.3 66 -99 SPO 1997 10 29 03 39 74 4.6 -9 668.60 -55.3 -52.3 -54.4 66 -99 SPO 1997 10 29 03 40 73 4.7 -9 668.60 -55.3 -52.3 -54.4 65 -99 SPO 1997 10 29 03 41 72 4.6 -9 668.60 -55.2 -52.3 -54.4 65 -99 SPO 1997 10 29 03 42 71 4.7 -9 668.60 -55.1 -52.3 -54.5 64 -99 SPO 1997 10 29 03 43 70 4.8 -9 668.60 -55.1 -52.2 -54.5 63 -99 SPO 1997 10 29 03 44 70 4.9 -9 668.60 -55.1 -52.0 -54.5 63 -99 SPO 1997 10 29 03 45 70 4.8 -9 668.60 -55.0 -51.8 -54.5 62 -99 SPO 1997 10 29 03 46 71 4.8 -9 668.60 -55.0 -51.8 -54.5 62 -99 SPO 1997 10 29 03 47 71 4.5 -9 668.60 -55.1 -51.9 -54.5 63 -99 SPO 1997 10 29 03 48 72 4.6 -9 668.60 -55.2 -51.9 -54.5 64 -99 SPO 1997 10 29 03 49 71 4.5 -9 668.60 -55.2 -51.9 -54.5 65 -99 SPO 1997 10 29 03 50 72 4.5 -9 668.60 -55.2 -52.0 -54.5 65 -99 SPO 1997 10 29 03 51 72 4.7 -9 668.60 -55.2 -52.1 -54.5 65 -99 SPO 1997 10 29 03 52 73 4.7 -9 668.60 -55.2 -52.1 -54.5 65 -99 SPO 1997 10 29 03 53 73 4.6 -9 668.60 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 29 03 54 74 4.5 -9 668.60 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 29 03 55 73 4.5 -9 668.60 -55.2 -52.2 -54.5 65 -99 SPO 1997 10 29 03 56 73 4.6 -9 668.60 -55.3 -52.1 -54.5 65 -99 SPO 1997 10 29 03 57 73 4.8 -9 668.60 -55.3 -52.0 -54.6 65 -99 SPO 1997 10 29 03 58 73 4.7 -9 668.60 -55.2 -52.1 -54.5 64 -99 SPO 1997 10 29 03 59 72 4.5 -9 668.60 -55.2 -52.1 -54.6 64 -99 SPO 1997 10 29 04 00 72 4.5 -9 668.60 -55.2 -52.2 -54.6 64 0 SPO 1997 10 29 04 01 72 4.5 -9 668.60 -55.2 -52.2 -54.6 65 -99 SPO 1997 10 29 04 02 72 4.3 -9 668.60 -55.2 -52.2 -54.6 65 -99 SPO 1997 10 29 04 03 72 4.4 -9 668.60 -55.2 -52.3 -54.6 65 -99 SPO 1997 10 29 04 04 71 4.4 -9 668.60 -55.2 -52.1 -54.6 65 -99 SPO 1997 10 29 04 05 70 4.4 -9 668.60 -55.1 -52.1 -54.5 64 -99 SPO 1997 10 29 04 06 70 4.4 -9 668.50 -55.2 -51.8 -54.5 66 -99 SPO 1997 10 29 04 07 70 4.3 -9 668.50 -55.1 -51.7 -54.5 65 -99 SPO 1997 10 29 04 08 69 4.2 -9 668.50 -55.1 -51.7 -54.4 65 -99 SPO 1997 10 29 04 09 70 4.1 -9 668.50 -55.1 -51.7 -54.4 65 -99 SPO 1997 10 29 04 10 70 4.2 -9 668.50 -55.0 -51.8 -54.4 64 -99 SPO 1997 10 29 04 11 70 4.2 -9 668.50 -55.1 -51.8 -54.4 65 -99 SPO 1997 10 29 04 12 70 4.3 -9 668.50 -55.1 -51.7 -54.4 65 -99 SPO 1997 10 29 04 13 71 4.1 -9 668.50 -55.1 -51.8 -54.4 65 -99 SPO 1997 10 29 04 14 72 4.1 -9 668.50 -55.1 -51.9 -54.3 65 -99 SPO 1997 10 29 04 15 73 4.1 -9 668.50 -55.0 -51.9 -54.3 65 -99 SPO 1997 10 29 04 16 74 4.1 -9 668.50 -55.0 -51.9 -54.3 66 -99 SPO 1997 10 29 04 17 74 4.1 -9 668.50 -55.0 -52.0 -54.3 66 -99 SPO 1997 10 29 04 18 74 4.2 -9 668.50 -55.0 -52.0 -54.2 66 -99 SPO 1997 10 29 04 19 74 4.2 -9 668.50 -55.0 -52.0 -54.3 66 -99 SPO 1997 10 29 04 20 74 4.3 -9 668.50 -55.0 -52.0 -54.3 66 -99 SPO 1997 10 29 04 21 74 4.4 -9 668.50 -55.1 -52.0 -54.3 66 -99 SPO 1997 10 29 04 22 74 4.2 -9 668.50 -55.0 -52.0 -54.3 66 -99 SPO 1997 10 29 04 23 73 4.4 -9 668.50 -55.1 -52.0 -54.3 66 -99 SPO 1997 10 29 04 24 73 4.4 -9 668.50 -55.1 -52.1 -54.3 66 -99 SPO 1997 10 29 04 25 72 4.5 -9 668.50 -55.0 -52.0 -54.3 65 -99 SPO 1997 10 29 04 26 70 4.3 -9 668.50 -55.0 -52.1 -54.4 64 -99 SPO 1997 10 29 04 27 71 4.3 -9 668.40 -54.9 -52.2 -54.3 63 -99 SPO 1997 10 29 04 28 71 4.4 -9 668.40 -54.8 -52.3 -54.3 62 -99 SPO 1997 10 29 04 29 70 4.4 -9 668.40 -54.7 -52.1 -54.2 62 -99 SPO 1997 10 29 04 30 70 4.3 -9 668.40 -54.7 -52.1 -54.2 63 -99 SPO 1997 10 29 04 31 70 4.3 -9 668.40 -54.8 -51.9 -54.2 65 -99 SPO 1997 10 29 04 32 71 4.3 -9 668.40 -54.9 -51.8 -54.3 66 -99 SPO 1997 10 29 04 33 71 4.3 -9 668.40 -54.9 -51.9 -54.3 66 -99 SPO 1997 10 29 04 34 70 4.3 -9 668.40 -54.9 -51.7 -54.3 66 -99 SPO 1997 10 29 04 35 69 4.4 -9 668.40 -54.8 -51.5 -54.4 66 -99 SPO 1997 10 29 04 36 68 4.5 -9 668.40 -54.9 -51.3 -54.4 66 -99 SPO 1997 10 29 04 37 67 4.5 -9 668.40 -54.9 -51.3 -54.4 66 -99 SPO 1997 10 29 04 38 67 4.3 -9 668.40 -54.8 -51.2 -54.3 65 -99 SPO 1997 10 29 04 39 67 4.3 -9 668.40 -54.8 -51.3 -54.3 65 -99 SPO 1997 10 29 04 40 67 4.3 -9 668.40 -54.9 -51.3 -54.3 66 -99 SPO 1997 10 29 04 41 68 4.3 -9 668.40 -54.9 -51.3 -54.3 65 -99 SPO 1997 10 29 04 42 68 4.6 -9 668.40 -54.8 -51.2 -54.3 64 -99 SPO 1997 10 29 04 43 68 4.2 -9 668.40 -54.8 -51.3 -54.3 65 -99 SPO 1997 10 29 04 44 69 4.3 -9 668.40 -54.8 -51.6 -54.3 65 -99 SPO 1997 10 29 04 45 70 4.3 -9 668.40 -54.8 -51.5 -54.2 66 -99 SPO 1997 10 29 04 46 71 4.3 -9 668.40 -54.8 -51.8 -54.2 66 -99 SPO 1997 10 29 04 47 72 4.4 -9 668.40 -54.8 -52.0 -54.2 66 -99 SPO 1997 10 29 04 48 71 4.6 -9 668.40 -54.9 -52.1 -54.3 66 -99 SPO 1997 10 29 04 49 70 4.6 -9 668.40 -54.9 -52.1 -54.3 66 -99 SPO 1997 10 29 04 50 69 4.6 -9 668.40 -54.8 -52.0 -54.3 66 -99 SPO 1997 10 29 04 51 69 4.5 -9 668.40 -54.8 -52.0 -54.3 66 -99 SPO 1997 10 29 04 52 70 4.4 -9 668.40 -54.7 -52.0 -54.3 65 -99 SPO 1997 10 29 04 53 69 4.3 -9 668.40 -54.8 -52.1 -54.3 66 -99 SPO 1997 10 29 04 54 70 4.0 -9 668.40 -54.7 -52.3 -54.2 64 -99 SPO 1997 10 29 04 55 71 4.0 -9 668.40 -54.7 -52.4 -54.2 64 -99 SPO 1997 10 29 04 56 71 3.9 -9 668.40 -54.8 -52.4 -54.2 65 -99 SPO 1997 10 29 04 57 70 3.9 -9 668.40 -54.8 -52.4 -54.2 64 -99 SPO 1997 10 29 04 58 71 3.9 -9 668.40 -54.9 -52.4 -54.2 66 -99 SPO 1997 10 29 04 59 71 3.8 -9 668.40 -54.9 -52.4 -54.2 66 -99 SPO 1997 10 29 05 00 71 3.7 -9 668.40 -54.9 -52.4 -54.2 66 0 SPO 1997 10 29 05 01 71 3.6 -9 668.40 -54.9 -52.4 -54.1 66 -99 SPO 1997 10 29 05 02 71 3.5 -9 668.40 -54.9 -52.4 -54.1 66 -99 SPO 1997 10 29 05 03 72 3.5 -9 668.40 -54.9 -52.4 -54.0 66 -99 SPO 1997 10 29 05 04 72 3.5 -9 668.40 -55.0 -52.5 -54.0 67 -99 SPO 1997 10 29 05 05 73 3.6 -9 668.40 -55.0 -52.5 -53.9 66 -99 SPO 1997 10 29 05 06 73 3.6 -9 668.40 -55.0 -52.5 -53.8 66 -99 SPO 1997 10 29 05 07 73 3.6 -9 668.40 -55.0 -52.5 -53.8 67 -99 SPO 1997 10 29 05 08 73 3.7 -9 668.40 -54.9 -52.4 -53.9 66 -99 SPO 1997 10 29 05 09 73 3.7 -9 668.40 -54.9 -52.4 -53.9 66 -99 SPO 1997 10 29 05 10 73 3.7 -9 668.40 -55.0 -52.4 -54.0 66 -99 SPO 1997 10 29 05 11 73 3.8 -9 668.40 -54.9 -52.5 -54.0 65 -99 SPO 1997 10 29 05 12 73 3.7 -9 668.40 -54.9 -52.5 -54.1 65 -99 SPO 1997 10 29 05 13 73 3.8 -9 668.40 -55.0 -52.5 -54.0 66 -99 SPO 1997 10 29 05 14 74 3.6 -9 668.40 -55.1 -52.5 -54.0 66 -99 SPO 1997 10 29 05 15 74 3.6 -9 668.40 -55.1 -52.4 -53.9 66 -99 SPO 1997 10 29 05 16 75 3.3 -9 668.40 -55.1 -52.5 -53.9 66 -99 SPO 1997 10 29 05 17 76 3.3 -9 668.40 -55.2 -52.5 -53.8 66 -99 SPO 1997 10 29 05 18 76 3.4 -9 668.40 -55.2 -52.5 -53.7 66 -99 SPO 1997 10 29 05 19 76 3.4 -9 668.40 -55.2 -52.5 -53.7 66 -99 SPO 1997 10 29 05 20 77 3.4 -9 668.30 -55.2 -52.4 -53.8 66 -99 SPO 1997 10 29 05 21 76 3.5 -9 668.30 -55.3 -52.4 -53.8 66 -99 SPO 1997 10 29 05 22 75 3.4 -9 668.30 -55.3 -52.4 -53.8 66 -99 SPO 1997 10 29 05 23 75 3.6 -9 668.30 -55.3 -52.3 -53.9 66 -99 SPO 1997 10 29 05 24 74 3.6 -9 668.30 -55.4 -52.4 -54.0 67 -99 SPO 1997 10 29 05 25 74 3.9 -9 668.30 -55.4 -52.3 -54.1 65 -99 SPO 1997 10 29 05 26 74 4.0 -9 668.30 -55.4 -52.2 -54.2 65 -99 SPO 1997 10 29 05 27 73 4.0 -9 668.30 -55.4 -52.1 -54.2 64 -99 SPO 1997 10 29 05 28 73 3.9 -9 668.30 -55.4 -51.9 -54.2 64 -99 SPO 1997 10 29 05 29 72 3.9 -9 668.30 -55.3 -51.8 -54.2 64 -99 SPO 1997 10 29 05 30 71 3.9 -9 668.30 -55.3 -51.7 -54.3 64 -99 SPO 1997 10 29 05 31 70 3.8 -9 668.30 -55.3 -51.6 -54.3 65 -99 SPO 1997 10 29 05 32 70 3.8 -9 668.30 -55.3 -51.6 -54.3 65 -99 SPO 1997 10 29 05 33 70 3.8 -9 668.30 -55.3 -51.6 -54.3 65 -99 SPO 1997 10 29 05 34 69 3.8 -9 668.30 -55.3 -51.4 -54.3 65 -99 SPO 1997 10 29 05 35 67 3.9 -9 668.30 -55.3 -51.3 -54.3 65 -99 SPO 1997 10 29 05 36 66 3.9 -9 668.30 -55.3 -51.2 -54.3 65 -99 SPO 1997 10 29 05 37 65 3.9 -9 668.30 -55.3 -51.2 -54.3 65 -99 SPO 1997 10 29 05 38 64 3.8 -9 668.30 -55.3 -51.1 -54.3 65 -99 SPO 1997 10 29 05 39 64 3.8 -9 668.30 -55.3 -51.1 -54.3 65 -99 SPO 1997 10 29 05 40 64 3.8 -9 668.20 -55.2 -51.0 -54.2 65 -99 SPO 1997 10 29 05 41 65 3.8 -9 668.20 -55.3 -51.0 -54.2 65 -99 SPO 1997 10 29 05 42 67 3.8 -9 668.20 -55.2 -51.0 -54.2 65 -99 SPO 1997 10 29 05 43 68 3.8 -9 668.20 -55.2 -51.2 -54.1 65 -99 SPO 1997 10 29 05 44 70 3.8 -9 668.20 -55.3 -51.3 -54.1 65 -99 SPO 1997 10 29 05 45 71 3.8 -9 668.20 -55.3 -51.3 -54.0 65 -99 SPO 1997 10 29 05 46 71 3.9 -9 668.20 -55.4 -51.3 -54.0 65 -99 SPO 1997 10 29 05 47 70 4.0 -9 668.20 -55.4 -51.2 -54.0 65 -99 SPO 1997 10 29 05 48 69 4.1 -9 668.20 -55.4 -51.2 -54.1 65 -99 SPO 1997 10 29 05 49 69 4.2 -9 668.20 -55.4 -51.2 -54.1 65 -99 SPO 1997 10 29 05 50 70 4.2 -9 668.20 -55.3 -51.2 -54.2 65 -99 SPO 1997 10 29 05 51 71 4.3 -9 668.20 -55.4 -51.3 -54.1 65 -99 SPO 1997 10 29 05 52 71 4.3 -9 668.20 -55.4 -51.3 -54.1 65 -99 SPO 1997 10 29 05 53 70 4.4 -9 668.20 -55.4 -51.2 -54.2 65 -99 SPO 1997 10 29 05 54 69 4.4 -9 668.20 -55.4 -51.2 -54.2 65 -99 SPO 1997 10 29 05 55 68 4.3 -9 668.20 -55.4 -51.0 -54.2 66 -99 SPO 1997 10 29 05 56 68 4.3 -9 668.20 -55.3 -50.9 -54.2 65 -99 SPO 1997 10 29 05 57 67 4.3 -9 668.20 -55.4 -50.7 -54.3 65 -99 SPO 1997 10 29 05 58 66 4.3 -9 668.20 -55.3 -50.8 -54.4 64 -99 SPO 1997 10 29 05 59 66 4.3 -9 668.20 -55.3 -50.9 -54.4 64 -99 SPO 1997 10 29 06 00 65 4.4 -9 668.10 -55.3 -50.8 -54.4 64 0 SPO 1997 10 29 06 01 66 4.5 -9 668.10 -55.3 -50.6 -54.4 64 -99 SPO 1997 10 29 06 02 66 4.5 -9 668.10 -55.3 -50.5 -54.4 64 -99 SPO 1997 10 29 06 03 67 4.5 -9 668.10 -55.3 -50.6 -54.4 65 -99 SPO 1997 10 29 06 04 68 4.5 -9 668.10 -55.3 -50.6 -54.4 65 -99 SPO 1997 10 29 06 05 69 4.5 -9 668.10 -55.2 -50.6 -54.4 64 -99 SPO 1997 10 29 06 06 69 4.6 -9 668.10 -55.2 -50.6 -54.4 64 -99 SPO 1997 10 29 06 07 68 4.5 -9 668.10 -55.2 -50.6 -54.4 64 -99 SPO 1997 10 29 06 08 68 4.6 -9 668.10 -55.1 -50.6 -54.3 64 -99 SPO 1997 10 29 06 09 67 4.6 -9 668.10 -55.2 -50.6 -54.3 66 -99 SPO 1997 10 29 06 10 66 4.6 -9 668.10 -55.1 -50.7 -54.3 65 -99 SPO 1997 10 29 06 11 66 4.7 -9 668.10 -55.1 -50.6 -54.4 65 -99 SPO 1997 10 29 06 12 66 4.7 -9 668.10 -55.1 -50.6 -54.4 65 -99 SPO 1997 10 29 06 13 66 4.8 -9 668.10 -55.1 -50.6 -54.4 64 -99 SPO 1997 10 29 06 14 68 4.8 -9 668.10 -55.1 -50.6 -54.4 63 -99 SPO 1997 10 29 06 15 69 4.8 -9 668.10 -55.1 -50.9 -54.4 63 -99 SPO 1997 10 29 06 16 71 4.7 -9 668.10 -55.2 -51.0 -54.4 65 -99 SPO 1997 10 29 06 17 72 4.7 -9 668.10 -55.2 -51.0 -54.4 65 -99 SPO 1997 10 29 06 18 74 4.7 -9 668.10 -55.2 -51.1 -54.4 65 -99 SPO 1997 10 29 06 19 75 4.8 -9 668.10 -55.2 -51.2 -54.3 64 -99 SPO 1997 10 29 06 20 75 4.7 -9 668.10 -55.1 -51.4 -54.3 63 -99 SPO 1997 10 29 06 21 76 4.8 -9 668.10 -55.1 -51.6 -54.3 64 -99 SPO 1997 10 29 06 22 75 4.8 -9 668.10 -55.2 -51.8 -54.3 65 -99 SPO 1997 10 29 06 23 75 4.9 -9 668.10 -55.1 -51.8 -54.4 64 -99 SPO 1997 10 29 06 24 75 4.8 -9 668.10 -55.1 -51.7 -54.3 64 -99 SPO 1997 10 29 06 25 75 4.8 -9 668.10 -55.1 -51.7 -54.3 64 -99 SPO 1997 10 29 06 26 75 4.8 -9 668.10 -55.0 -51.8 -54.3 63 -99 SPO 1997 10 29 06 27 75 4.7 -9 668.10 -55.1 -52.0 -54.2 65 -99 SPO 1997 10 29 06 28 75 4.6 -9 668.10 -55.1 -52.0 -54.2 65 -99 SPO 1997 10 29 06 29 75 4.6 -9 668.20 -55.1 -52.1 -54.2 64 -99 SPO 1997 10 29 06 30 75 4.5 -9 668.20 -55.1 -52.1 -54.2 65 -99 SPO 1997 10 29 06 31 75 4.5 -9 668.20 -55.1 -52.0 -54.2 65 -99 SPO 1997 10 29 06 32 76 4.5 -9 668.20 -55.1 -52.0 -54.2 65 -99 SPO 1997 10 29 06 33 76 4.5 -9 668.20 -55.0 -52.0 -54.2 64 -99 SPO 1997 10 29 06 34 77 4.4 -9 668.20 -55.1 -52.0 -54.2 66 -99 SPO 1997 10 29 06 35 78 4.3 -9 668.20 -55.1 -52.0 -54.2 66 -99 SPO 1997 10 29 06 36 79 4.3 -9 668.20 -55.2 -52.1 -54.1 66 -99 SPO 1997 10 29 06 37 78 4.4 -9 668.20 -55.2 -52.1 -54.1 66 -99 SPO 1997 10 29 06 38 76 4.4 -9 668.20 -55.1 -52.0 -54.2 65 -99 SPO 1997 10 29 06 39 75 4.4 -9 668.20 -55.0 -51.9 -54.2 64 -99 SPO 1997 10 29 06 40 74 4.6 -9 668.20 -55.0 -51.8 -54.2 64 -99 SPO 1997 10 29 06 41 73 4.8 -9 668.20 -55.0 -51.8 -54.2 64 -99 SPO 1997 10 29 06 42 73 4.9 -9 668.20 -55.0 -51.7 -54.2 64 -99 SPO 1997 10 29 06 43 73 4.9 -9 668.20 -54.9 -51.7 -54.2 62 -99 SPO 1997 10 29 06 44 74 5.0 -9 668.20 -54.9 -51.7 -54.2 62 -99 SPO 1997 10 29 06 45 74 5.1 -9 668.20 -54.9 -51.7 -54.2 63 -99 SPO 1997 10 29 06 46 73 5.1 -9 668.20 -54.9 -51.7 -54.2 64 -99 SPO 1997 10 29 06 47 73 5.1 -9 668.20 -54.9 -51.7 -54.2 64 -99 SPO 1997 10 29 06 48 73 5.1 -9 668.20 -54.9 -51.6 -54.2 65 -99 SPO 1997 10 29 06 49 72 5.1 -9 668.20 -54.9 -51.6 -54.2 65 -99 SPO 1997 10 29 06 50 71 5.1 -9 668.20 -54.8 -51.6 -54.2 64 -99 SPO 1997 10 29 06 51 71 5.0 -9 668.20 -54.8 -51.5 -54.2 65 -99 SPO 1997 10 29 06 52 70 5.0 -9 668.20 -54.8 -51.5 -54.2 65 -99 SPO 1997 10 29 06 53 70 5.0 -9 668.20 -54.8 -51.4 -54.2 65 -99 SPO 1997 10 29 06 54 69 4.9 -9 668.20 -54.8 -51.4 -54.2 65 -99 SPO 1997 10 29 06 55 69 4.9 -9 668.20 -54.9 -51.4 -54.2 66 -99 SPO 1997 10 29 06 56 70 4.8 -9 668.20 -54.9 -51.5 -54.2 66 -99 SPO 1997 10 29 06 57 70 4.8 -9 668.20 -54.8 -51.5 -54.2 65 -99 SPO 1997 10 29 06 58 70 4.8 -9 668.20 -54.8 -51.4 -54.2 64 -99 SPO 1997 10 29 06 59 69 4.8 -9 668.20 -54.9 -51.4 -54.2 65 -99 SPO 1997 10 29 07 00 69 4.9 -9 668.20 -54.9 -51.5 -54.2 64 0 SPO 1997 10 29 07 01 69 4.8 -9 668.20 -54.9 -51.4 -54.2 64 -99 SPO 1997 10 29 07 02 68 4.7 -9 668.20 -54.9 -51.4 -54.2 64 -99 SPO 1997 10 29 07 03 67 4.6 -9 668.20 -54.9 -51.5 -54.2 65 -99 SPO 1997 10 29 07 04 67 4.6 -9 668.20 -55.0 -51.4 -54.2 66 -99 SPO 1997 10 29 07 05 67 4.6 -9 668.20 -55.0 -51.3 -54.2 66 -99 SPO 1997 10 29 07 06 66 4.6 -9 668.20 -55.0 -51.2 -54.2 66 -99 SPO 1997 10 29 07 07 66 4.7 -9 668.20 -55.0 -51.1 -54.2 66 -99 SPO 1997 10 29 07 08 66 4.8 -9 668.10 -55.0 -51.0 -54.2 66 -99 SPO 1997 10 29 07 09 66 4.8 -9 668.10 -55.0 -51.0 -54.2 66 -99 SPO 1997 10 29 07 10 66 4.9 -9 668.10 -54.9 -50.9 -54.2 65 -99 SPO 1997 10 29 07 11 66 4.9 -9 668.10 -54.9 -50.9 -54.2 65 -99 SPO 1997 10 29 07 12 66 4.9 -9 668.10 -54.9 -50.8 -54.2 65 -99 SPO 1997 10 29 07 13 65 4.9 -9 668.10 -54.9 -50.7 -54.1 65 -99 SPO 1997 10 29 07 14 65 4.9 -9 668.10 -54.9 -50.6 -54.1 65 -99 SPO 1997 10 29 07 15 65 4.8 -9 668.10 -54.8 -50.5 -54.1 64 -99 SPO 1997 10 29 07 16 64 4.8 -9 668.10 -54.8 -50.4 -54.0 65 -99 SPO 1997 10 29 07 17 64 4.8 -9 668.10 -54.7 -50.4 -54.0 65 -99 SPO 1997 10 29 07 18 64 4.8 -9 668.10 -54.7 -50.4 -54.0 65 -99 SPO 1997 10 29 07 19 64 4.9 -9 668.10 -54.7 -50.4 -54.0 66 -99 SPO 1997 10 29 07 20 63 4.8 -9 668.10 -54.6 -50.4 -54.0 64 -99 SPO 1997 10 29 07 21 62 4.9 -9 668.10 -54.6 -50.4 -53.9 65 -99 SPO 1997 10 29 07 22 61 4.8 -9 668.10 -54.6 -50.4 -53.9 66 -99 SPO 1997 10 29 07 23 61 4.9 -9 668.10 -54.6 -50.4 -53.9 66 -99 SPO 1997 10 29 07 24 60 5.0 -9 668.10 -54.6 -50.3 -53.9 66 -99 SPO 1997 10 29 07 25 60 4.9 -9 668.10 -54.6 -50.3 -53.9 66 -99 SPO 1997 10 29 07 26 61 5.0 -9 668.10 -54.6 -50.3 -53.9 66 -99 SPO 1997 10 29 07 27 61 5.0 -9 668.10 -54.6 -50.2 -53.9 65 -99 SPO 1997 10 29 07 28 61 5.2 -9 668.10 -54.6 -50.0 -54.0 65 -99 SPO 1997 10 29 07 29 62 5.2 -9 668.10 -54.6 -49.9 -53.9 64 -99 SPO 1997 10 29 07 30 63 5.2 -9 668.10 -54.6 -49.9 -53.9 65 -99 SPO 1997 10 29 07 31 63 5.2 -9 668.10 -54.6 -49.9 -53.9 65 -99 SPO 1997 10 29 07 32 63 5.2 -9 668.10 -54.6 -50.0 -53.9 66 -99 SPO 1997 10 29 07 33 64 5.2 -9 668.10 -54.6 -50.0 -53.9 66 -99 SPO 1997 10 29 07 34 63 5.2 -9 668.10 -54.6 -50.1 -53.9 66 -99 SPO 1997 10 29 07 35 63 5.1 -9 668.10 -54.6 -50.2 -53.9 66 -99 SPO 1997 10 29 07 36 63 5.1 -9 668.10 -54.5 -50.2 -53.9 65 -99 SPO 1997 10 29 07 37 64 5.0 -9 668.10 -54.5 -50.3 -53.9 66 -99 SPO 1997 10 29 07 38 64 5.0 -9 668.00 -54.5 -50.2 -53.9 66 -99 SPO 1997 10 29 07 39 64 5.0 -9 668.00 -54.5 -50.2 -53.9 66 -99 SPO 1997 10 29 07 40 65 5.1 -9 668.00 -54.5 -50.3 -53.9 65 -99 SPO 1997 10 29 07 41 64 5.0 -9 668.00 -54.5 -50.4 -53.9 65 -99 SPO 1997 10 29 07 42 64 5.0 -9 668.00 -54.5 -50.3 -53.9 65 -99 SPO 1997 10 29 07 43 63 5.1 -9 668.00 -54.6 -50.3 -54.0 66 -99 SPO 1997 10 29 07 44 63 5.1 -9 668.00 -54.6 -50.3 -53.9 66 -99 SPO 1997 10 29 07 45 64 5.1 -9 668.00 -54.6 -50.3 -53.9 65 -99 SPO 1997 10 29 07 46 64 5.1 -9 668.00 -54.5 -50.3 -53.9 64 -99 SPO 1997 10 29 07 47 65 5.1 -9 668.00 -54.5 -50.2 -53.9 65 -99 SPO 1997 10 29 07 48 65 5.1 -9 668.00 -54.5 -50.1 -53.9 65 -99 SPO 1997 10 29 07 49 66 5.1 -9 668.00 -54.5 -50.1 -53.9 65 -99 SPO 1997 10 29 07 50 66 5.0 -9 668.00 -54.5 -50.2 -53.9 65 -99 SPO 1997 10 29 07 51 66 4.9 -9 668.00 -54.5 -50.3 -54.0 65 -99 SPO 1997 10 29 07 52 65 5.0 -9 668.00 -54.6 -50.3 -54.0 66 -99 SPO 1997 10 29 07 53 64 5.0 -9 668.00 -54.6 -50.2 -54.0 66 -99 SPO 1997 10 29 07 54 64 5.0 -9 668.00 -54.6 -50.1 -54.0 65 -99 SPO 1997 10 29 07 55 65 5.0 -9 668.00 -54.6 -50.1 -54.0 64 -99 SPO 1997 10 29 07 56 66 4.9 -9 668.00 -54.6 -50.2 -54.0 64 -99 SPO 1997 10 29 07 57 67 5.0 -9 668.00 -54.6 -50.3 -54.1 64 -99 SPO 1997 10 29 07 58 68 5.0 -9 668.00 -54.6 -50.4 -54.1 64 -99 SPO 1997 10 29 07 59 69 5.0 -9 668.00 -54.6 -50.6 -54.1 65 -99 SPO 1997 10 29 08 00 69 4.9 -9 668.00 -54.7 -50.6 -54.1 66 0 SPO 1997 10 29 08 01 69 4.8 -9 668.00 -54.7 -50.7 -54.1 66 -99 SPO 1997 10 29 08 02 69 4.8 -9 668.00 -54.7 -50.8 -54.1 66 -99 SPO 1997 10 29 08 03 69 4.7 -9 668.00 -54.7 -50.8 -54.1 66 -99 SPO 1997 10 29 08 04 69 4.6 -9 668.00 -54.7 -50.9 -54.1 66 -99 SPO 1997 10 29 08 05 69 4.7 -9 668.00 -54.7 -51.0 -54.1 65 -99 SPO 1997 10 29 08 06 69 4.6 -9 668.00 -54.7 -50.9 -54.1 65 -99 SPO 1997 10 29 08 07 70 4.6 -9 668.00 -54.7 -50.8 -54.1 64 -99 SPO 1997 10 29 08 08 70 4.6 -9 668.00 -54.7 -50.9 -54.1 64 -99 SPO 1997 10 29 08 09 69 4.6 -9 668.00 -54.7 -50.8 -54.1 63 -99 SPO 1997 10 29 08 10 69 4.5 -9 668.00 -54.7 -50.8 -54.1 63 -99 SPO 1997 10 29 08 11 68 4.5 -9 668.00 -54.7 -50.8 -54.1 63 -99 SPO 1997 10 29 08 12 67 4.4 -9 668.00 -54.7 -50.7 -54.1 64 -99 SPO 1997 10 29 08 13 68 4.5 -9 668.00 -54.7 -50.7 -54.1 65 -99 SPO 1997 10 29 08 14 67 4.4 -9 668.00 -54.7 -50.6 -54.1 65 -99 SPO 1997 10 29 08 15 67 4.4 -9 668.00 -54.7 -50.6 -54.1 64 -99 SPO 1997 10 29 08 16 67 4.4 -9 668.00 -54.7 -50.7 -54.1 64 -99 SPO 1997 10 29 08 17 67 4.6 -9 668.00 -54.7 -50.8 -54.1 64 -99 SPO 1997 10 29 08 18 67 4.5 -9 668.00 -54.8 -50.8 -54.1 65 -99 SPO 1997 10 29 08 19 68 4.5 -9 668.00 -54.8 -50.7 -54.1 65 -99 SPO 1997 10 29 08 20 67 4.6 -9 668.00 -54.7 -50.7 -54.1 64 -99 SPO 1997 10 29 08 21 67 4.6 -9 668.00 -54.7 -50.7 -54.1 64 -99 SPO 1997 10 29 08 22 67 4.6 -9 668.00 -54.8 -50.6 -54.1 65 -99 SPO 1997 10 29 08 23 67 4.6 -9 668.00 -54.7 -50.7 -54.1 64 -99 SPO 1997 10 29 08 24 67 4.6 -9 668.00 -54.7 -50.8 -54.1 64 -99 SPO 1997 10 29 08 25 67 4.6 -9 667.90 -54.7 -50.8 -54.1 65 -99 SPO 1997 10 29 08 26 67 4.5 -9 667.90 -54.7 -50.7 -54.0 65 -99 SPO 1997 10 29 08 27 67 4.5 -9 667.90 -54.7 -50.7 -54.0 66 -99 SPO 1997 10 29 08 28 67 4.5 -9 667.90 -54.7 -50.7 -54.0 66 -99 SPO 1997 10 29 08 29 67 4.5 -9 667.90 -54.8 -50.6 -54.0 66 -99 SPO 1997 10 29 08 30 67 4.4 -9 667.90 -54.7 -50.5 -54.0 66 -99 SPO 1997 10 29 08 31 68 4.3 -9 667.90 -54.7 -50.4 -54.0 65 -99 SPO 1997 10 29 08 32 69 4.3 -9 667.90 -54.7 -50.4 -53.9 66 -99 SPO 1997 10 29 08 33 70 4.3 -9 667.90 -54.7 -50.3 -53.9 65 -99 SPO 1997 10 29 08 34 71 4.2 -9 667.90 -54.8 -50.4 -53.8 66 -99 SPO 1997 10 29 08 35 72 4.2 -9 667.90 -54.8 -50.5 -53.7 66 -99 SPO 1997 10 29 08 36 73 4.1 -9 667.90 -54.8 -50.5 -53.6 65 -99 SPO 1997 10 29 08 37 75 4.2 -9 667.90 -54.9 -50.5 -53.5 66 -99 SPO 1997 10 29 08 38 76 4.2 -9 667.90 -55.0 -50.6 -53.4 66 -99 SPO 1997 10 29 08 39 77 4.3 -9 667.90 -55.0 -50.6 -53.4 66 -99 SPO 1997 10 29 08 40 77 4.4 -9 667.90 -55.1 -50.5 -53.4 66 -99 SPO 1997 10 29 08 41 78 4.4 -9 667.90 -55.1 -50.5 -53.5 66 -99 SPO 1997 10 29 08 42 79 4.5 -9 667.90 -55.2 -50.6 -53.5 66 -99 SPO 1997 10 29 08 43 79 4.5 -9 667.90 -55.2 -50.8 -53.6 66 -99 SPO 1997 10 29 08 44 80 4.5 -9 667.90 -55.4 -51.0 -53.6 67 -99 SPO 1997 10 29 08 45 81 4.6 -9 667.90 -55.4 -51.0 -53.7 66 -99 SPO 1997 10 29 08 46 81 4.6 -9 667.90 -55.4 -51.0 -53.7 66 -99 SPO 1997 10 29 08 47 82 4.5 -9 667.90 -55.6 -51.0 -53.8 67 -99 SPO 1997 10 29 08 48 83 4.5 -9 667.90 -55.7 -51.1 -54.0 66 -99 SPO 1997 10 29 08 49 83 4.4 -9 667.90 -55.8 -51.1 -54.0 65 -99 SPO 1997 10 29 08 50 84 4.3 -9 667.90 -55.9 -51.2 -54.1 65 -99 SPO 1997 10 29 08 51 84 4.3 -9 667.90 -55.9 -51.3 -54.1 64 -99 SPO 1997 10 29 08 52 84 4.4 -9 667.90 -56.0 -51.2 -54.2 64 -99 SPO 1997 10 29 08 53 85 4.4 -9 667.90 -56.0 -51.1 -54.2 63 -99 SPO 1997 10 29 08 54 86 4.3 -9 667.80 -55.9 -51.2 -54.3 63 -99 SPO 1997 10 29 08 55 87 4.3 -9 667.80 -55.9 -51.5 -54.3 64 -99 SPO 1997 10 29 08 56 87 4.2 -9 667.80 -55.9 -51.7 -54.3 64 -99 SPO 1997 10 29 08 57 87 4.1 -9 667.80 -56.0 -51.7 -54.3 65 -99 SPO 1997 10 29 08 58 86 4.0 -9 667.80 -56.1 -51.6 -54.3 65 -99 SPO 1997 10 29 08 59 85 4.1 -9 667.80 -56.2 -51.5 -54.4 65 -99 SPO 1997 10 29 09 00 85 4.0 -9 667.80 -56.2 -51.4 -54.4 65 0 SPO 1997 10 29 09 01 85 4.0 -9 667.80 -56.2 -51.5 -54.3 64 -99 SPO 1997 10 29 09 02 85 4.0 -9 667.80 -56.2 -51.6 -54.3 64 -99 SPO 1997 10 29 09 03 86 4.1 -9 667.80 -56.2 -51.6 -54.3 64 -99 SPO 1997 10 29 09 04 86 4.2 -9 667.80 -56.2 -51.6 -54.3 64 -99 SPO 1997 10 29 09 05 86 4.1 -9 667.80 -56.2 -51.6 -54.4 63 -99 SPO 1997 10 29 09 06 87 4.1 -9 667.80 -56.2 -51.5 -54.4 64 -99 SPO 1997 10 29 09 07 88 4.1 -9 667.80 -56.3 -51.5 -54.5 64 -99 SPO 1997 10 29 09 08 87 4.1 -9 667.80 -56.3 -51.4 -54.5 64 -99 SPO 1997 10 29 09 09 88 4.1 -9 667.80 -56.3 -51.4 -54.5 64 -99 SPO 1997 10 29 09 10 87 4.1 -9 667.80 -56.3 -51.4 -54.6 64 -99 SPO 1997 10 29 09 11 88 4.1 -9 667.80 -56.3 -51.4 -54.6 64 -99 SPO 1997 10 29 09 12 88 4.1 -9 667.80 -56.3 -51.3 -54.5 64 -99 SPO 1997 10 29 09 13 87 4.1 -9 667.80 -56.3 -51.5 -54.5 64 -99 SPO 1997 10 29 09 14 87 4.2 -9 667.80 -56.3 -51.5 -54.5 64 -99 SPO 1997 10 29 09 15 87 4.3 -9 667.80 -56.2 -51.5 -54.4 64 -99 SPO 1997 10 29 09 16 87 4.4 -9 667.80 -56.2 -51.4 -54.5 64 -99 SPO 1997 10 29 09 17 87 4.4 -9 667.80 -56.2 -51.3 -54.4 65 -99 SPO 1997 10 29 09 18 86 4.5 -9 667.70 -56.1 -51.3 -54.4 64 -99 SPO 1997 10 29 09 19 86 4.5 -9 667.70 -56.0 -51.3 -54.4 64 -99 SPO 1997 10 29 09 20 87 4.6 -9 667.70 -56.0 -51.3 -54.4 65 -99 SPO 1997 10 29 09 21 88 4.7 -9 667.70 -55.9 -51.4 -54.4 64 -99 SPO 1997 10 29 09 22 88 4.7 -9 667.70 -55.9 -51.4 -54.4 65 -99 SPO 1997 10 29 09 23 88 4.8 -9 667.70 -55.9 -51.4 -54.5 65 -99 SPO 1997 10 29 09 24 87 4.8 -9 667.70 -55.9 -51.4 -54.5 65 -99 SPO 1997 10 29 09 25 86 4.8 -9 667.70 -55.8 -51.4 -54.5 65 -99 SPO 1997 10 29 09 26 86 4.7 -9 667.70 -55.8 -51.3 -54.4 65 -99 SPO 1997 10 29 09 27 86 4.7 -9 667.70 -55.7 -51.2 -54.4 65 -99 SPO 1997 10 29 09 28 86 4.7 -9 667.70 -55.7 -51.2 -54.5 65 -99 SPO 1997 10 29 09 29 86 4.8 -9 667.70 -55.6 -51.2 -54.4 65 -99 SPO 1997 10 29 09 30 85 4.8 -9 667.60 -55.6 -51.1 -54.4 65 -99 SPO 1997 10 29 09 31 85 4.8 -9 667.60 -55.5 -51.1 -54.4 64 -99 SPO 1997 10 29 09 32 85 4.8 -9 667.60 -55.5 -51.0 -54.3 64 -99 SPO 1997 10 29 09 33 84 4.7 -9 667.60 -55.4 -51.0 -54.3 64 -99 SPO 1997 10 29 09 34 84 4.7 -9 667.60 -55.4 -50.9 -54.3 64 -99 SPO 1997 10 29 09 35 83 4.7 -9 667.60 -55.4 -50.8 -54.3 65 -99 SPO 1997 10 29 09 36 83 4.7 -9 667.60 -55.4 -50.8 -54.3 65 -99 SPO 1997 10 29 09 37 82 4.8 -9 667.60 -55.3 -50.8 -54.3 65 -99 SPO 1997 10 29 09 38 80 4.8 -9 667.60 -55.3 -50.7 -54.3 66 -99 SPO 1997 10 29 09 39 79 4.9 -9 667.60 -55.2 -50.7 -54.3 66 -99 SPO 1997 10 29 09 40 78 5.0 -9 667.60 -55.2 -50.6 -54.3 66 -99 SPO 1997 10 29 09 41 77 5.0 -9 667.60 -55.2 -50.6 -54.4 66 -99 SPO 1997 10 29 09 42 76 5.0 -9 667.60 -55.2 -50.4 -54.4 66 -99 SPO 1997 10 29 09 43 75 5.0 -9 667.60 -55.2 -50.3 -54.4 66 -99 SPO 1997 10 29 09 44 75 4.9 -9 667.60 -55.2 -50.1 -54.4 66 -99 SPO 1997 10 29 09 45 75 4.9 -9 667.60 -55.2 -50.0 -54.4 66 -99 SPO 1997 10 29 09 46 74 4.8 -9 667.60 -55.2 -49.8 -54.3 66 -99 SPO 1997 10 29 09 47 73 4.9 -9 667.60 -55.2 -49.8 -54.4 66 -99 SPO 1997 10 29 09 48 73 4.9 -9 667.60 -55.2 -49.7 -54.4 66 -99 SPO 1997 10 29 09 49 73 5.0 -9 667.60 -55.2 -49.7 -54.4 66 -99 SPO 1997 10 29 09 50 73 5.1 -9 667.60 -55.2 -49.7 -54.5 66 -99 SPO 1997 10 29 09 51 75 5.1 -9 667.60 -55.3 -49.8 -54.5 65 -99 SPO 1997 10 29 09 52 76 5.2 -9 667.60 -55.2 -49.9 -54.5 65 -99 SPO 1997 10 29 09 53 77 5.2 -9 667.60 -55.3 -49.8 -54.5 65 -99 SPO 1997 10 29 09 54 77 5.3 -9 667.60 -55.2 -49.8 -54.5 65 -99 SPO 1997 10 29 09 55 77 5.3 -9 667.60 -55.2 -50.0 -54.5 65 -99 SPO 1997 10 29 09 56 77 5.3 -9 667.60 -55.2 -50.1 -54.4 65 -99 SPO 1997 10 29 09 57 77 5.3 -9 667.60 -55.1 -50.1 -54.4 65 -99 SPO 1997 10 29 09 58 77 5.3 -9 667.60 -55.1 -50.0 -54.4 64 -99 SPO 1997 10 29 09 59 76 5.4 -9 667.60 -55.2 -49.9 -54.4 65 -99 SPO 1997 10 29 10 00 77 5.3 -9 667.50 -55.1 -50.0 -54.4 65 0 SPO 1997 10 29 10 01 77 5.2 -9 667.60 -55.1 -49.9 -54.4 65 -99 SPO 1997 10 29 10 02 77 5.0 -9 667.60 -55.1 -50.0 -54.4 65 -99 SPO 1997 10 29 10 03 78 4.8 -9 667.60 -55.1 -50.2 -54.4 65 -99 SPO 1997 10 29 10 04 79 4.7 -9 667.60 -55.2 -50.3 -54.4 66 -99 SPO 1997 10 29 10 05 80 4.7 -9 667.60 -55.2 -50.4 -54.4 66 -99 SPO 1997 10 29 10 06 83 4.6 -9 667.60 -55.2 -50.5 -54.3 65 -99 SPO 1997 10 29 10 07 84 4.6 -9 667.60 -55.3 -50.6 -54.3 65 -99 SPO 1997 10 29 10 08 84 4.6 -9 667.60 -55.3 -50.6 -54.3 65 -99 SPO 1997 10 29 10 09 83 4.5 -9 667.60 -55.3 -50.6 -54.3 65 -99 SPO 1997 10 29 10 10 83 4.5 -9 667.60 -55.3 -50.6 -54.3 65 -99 SPO 1997 10 29 10 11 83 4.5 -9 667.60 -55.3 -50.7 -54.3 65 -99 SPO 1997 10 29 10 12 83 4.6 -9 667.60 -55.3 -50.7 -54.3 65 -99 SPO 1997 10 29 10 13 83 4.5 -9 667.60 -55.4 -50.8 -54.3 65 -99 SPO 1997 10 29 10 14 85 4.4 -9 667.60 -55.3 -51.0 -54.3 65 -99 SPO 1997 10 29 10 15 86 4.3 -9 667.60 -55.3 -51.1 -54.2 64 -99 SPO 1997 10 29 10 16 86 4.4 -9 667.60 -55.3 -51.2 -54.2 64 -99 SPO 1997 10 29 10 17 85 4.4 -9 667.60 -55.4 -51.2 -54.2 65 -99 SPO 1997 10 29 10 18 85 4.5 -9 667.60 -55.3 -51.4 -54.2 65 -99 SPO 1997 10 29 10 19 86 4.5 -9 667.60 -55.4 -51.6 -54.1 65 -99 SPO 1997 10 29 10 20 87 4.4 -9 667.60 -55.4 -51.8 -54.1 66 -99 SPO 1997 10 29 10 21 86 4.3 -9 667.60 -55.3 -51.9 -54.1 65 -99 SPO 1997 10 29 10 22 84 4.1 -9 667.60 -55.2 -51.8 -54.1 66 -99 SPO 1997 10 29 10 23 85 4.1 -9 667.60 -55.3 -51.8 -54.1 66 -99 SPO 1997 10 29 10 24 88 4.0 -9 667.60 -55.4 -52.0 -54.0 66 -99 SPO 1997 10 29 10 25 89 4.1 -9 667.60 -55.4 -52.0 -53.9 66 -99 SPO 1997 10 29 10 26 88 4.2 -9 667.60 -55.4 -52.1 -53.9 65 -99 SPO 1997 10 29 10 27 87 4.2 -9 667.60 -55.4 -51.9 -53.9 65 -99 SPO 1997 10 29 10 28 86 4.1 -9 667.60 -55.3 -51.8 -53.9 65 -99 SPO 1997 10 29 10 29 87 4.1 -9 667.60 -55.4 -51.8 -53.9 65 -99 SPO 1997 10 29 10 30 88 4.0 -9 667.60 -55.4 -51.7 -53.9 65 -99 SPO 1997 10 29 10 31 88 4.0 -9 667.60 -55.4 -51.7 -53.8 65 -99 SPO 1997 10 29 10 32 88 4.0 -9 667.60 -55.4 -51.6 -53.8 66 -99 SPO 1997 10 29 10 33 87 4.0 -9 667.60 -55.5 -51.6 -53.8 67 -99 SPO 1997 10 29 10 34 87 4.1 -9 667.60 -55.5 -51.7 -53.8 67 -99 SPO 1997 10 29 10 35 88 4.1 -9 667.60 -55.5 -51.8 -53.8 68 -99 SPO 1997 10 29 10 36 88 4.2 -9 667.60 -55.5 -51.9 -53.8 68 -99 SPO 1997 10 29 10 37 88 4.1 -9 667.60 -55.5 -51.8 -53.9 67 -99 SPO 1997 10 29 10 38 88 4.0 -9 667.60 -55.5 -51.7 -53.8 67 -99 SPO 1997 10 29 10 39 87 4.0 -9 667.60 -55.5 -51.4 -53.9 67 -99 SPO 1997 10 29 10 40 87 4.0 -9 667.50 -55.4 -51.5 -53.9 66 -99 SPO 1997 10 29 10 41 87 4.0 -9 667.50 -55.4 -51.4 -53.8 65 -99 SPO 1997 10 29 10 42 87 4.0 -9 667.50 -55.3 -51.4 -53.9 65 -99 SPO 1997 10 29 10 43 87 4.0 -9 667.50 -55.4 -51.5 -53.8 65 -99 SPO 1997 10 29 10 44 86 4.0 -9 667.50 -55.4 -51.3 -53.8 65 -99 SPO 1997 10 29 10 45 86 4.1 -9 667.50 -55.4 -51.2 -53.9 66 -99 SPO 1997 10 29 10 46 85 4.1 -9 667.50 -55.4 -51.1 -53.9 65 -99 SPO 1997 10 29 10 47 84 4.1 -9 667.50 -55.4 -50.9 -53.9 66 -99 SPO 1997 10 29 10 48 83 4.2 -9 667.50 -55.4 -50.6 -53.9 66 -99 SPO 1997 10 29 10 49 82 4.2 -9 667.50 -55.4 -50.3 -53.9 67 -99 SPO 1997 10 29 10 50 81 4.2 -9 667.50 -55.4 -50.0 -54.0 67 -99 SPO 1997 10 29 10 51 79 4.3 -9 667.50 -55.3 -49.8 -54.1 66 -99 SPO 1997 10 29 10 52 77 4.4 -9 667.50 -55.3 -49.7 -54.2 66 -99 SPO 1997 10 29 10 53 77 4.5 -9 667.50 -55.3 -49.6 -54.3 66 -99 SPO 1997 10 29 10 54 76 4.5 -9 667.50 -55.2 -49.6 -54.3 66 -99 SPO 1997 10 29 10 55 76 4.6 -9 667.50 -55.2 -49.6 -54.4 66 -99 SPO 1997 10 29 10 56 76 4.7 -9 667.50 -55.1 -49.6 -54.3 65 -99 SPO 1997 10 29 10 57 75 4.8 -9 667.50 -55.1 -49.7 -54.3 65 -99 SPO 1997 10 29 10 58 74 5.0 -9 667.50 -55.1 -49.8 -54.3 66 -99 SPO 1997 10 29 10 59 74 5.1 -9 667.50 -55.1 -49.8 -54.4 66 -99 SPO 1997 10 29 11 00 74 5.0 -9 667.50 -55.0 -49.8 -54.4 66 0 SPO 1997 10 29 11 01 74 5.1 -9 667.50 -55.1 -49.9 -54.4 66 -99 SPO 1997 10 29 11 02 74 5.1 -9 667.50 -55.0 -49.8 -54.4 66 -99 SPO 1997 10 29 11 03 74 5.3 -9 667.50 -55.0 -49.7 -54.4 66 -99 SPO 1997 10 29 11 04 74 5.2 -9 667.50 -54.9 -49.6 -54.3 66 -99 SPO 1997 10 29 11 05 73 5.3 -9 667.50 -54.9 -49.5 -54.3 66 -99 SPO 1997 10 29 11 06 74 5.3 -9 667.50 -54.9 -49.6 -54.3 66 -99 SPO 1997 10 29 11 07 74 5.3 -9 667.50 -54.8 -49.6 -54.4 66 -99 SPO 1997 10 29 11 08 75 5.3 -9 667.50 -54.9 -49.6 -54.3 66 -99 SPO 1997 10 29 11 09 75 5.3 -9 667.50 -54.9 -49.8 -54.3 66 -99 SPO 1997 10 29 11 10 76 5.4 -9 667.50 -54.9 -49.9 -54.4 66 -99 SPO 1997 10 29 11 11 76 5.3 -9 667.50 -54.9 -50.0 -54.4 66 -99 SPO 1997 10 29 11 12 76 5.3 -9 667.50 -54.9 -50.1 -54.4 65 -99 SPO 1997 10 29 11 13 76 5.2 -9 667.50 -54.9 -50.2 -54.3 65 -99 SPO 1997 10 29 11 14 76 5.2 -9 667.50 -54.9 -50.2 -54.3 65 -99 SPO 1997 10 29 11 15 76 5.0 -9 667.50 -54.9 -50.3 -54.2 66 -99 SPO 1997 10 29 11 16 77 5.0 -9 667.50 -54.9 -50.4 -54.3 66 -99 SPO 1997 10 29 11 17 78 4.9 -9 667.50 -55.0 -50.5 -54.2 66 -99 SPO 1997 10 29 11 18 78 4.9 -9 667.50 -55.1 -50.6 -54.3 67 -99 SPO 1997 10 29 11 19 78 4.8 -9 667.50 -55.1 -50.7 -54.3 66 -99 SPO 1997 10 29 11 20 78 4.8 -9 667.50 -55.2 -50.6 -54.4 67 -99 SPO 1997 10 29 11 21 78 4.9 -9 667.50 -55.2 -50.6 -54.4 66 -99 SPO 1997 10 29 11 22 78 4.9 -9 667.50 -55.2 -50.7 -54.4 66 -99 SPO 1997 10 29 11 23 77 5.0 -9 667.50 -55.2 -50.6 -54.4 66 -99 SPO 1997 10 29 11 24 77 4.9 -9 667.50 -55.2 -50.6 -54.5 66 -99 SPO 1997 10 29 11 25 77 4.8 -9 667.50 -55.2 -50.7 -54.5 66 -99 SPO 1997 10 29 11 26 77 4.8 -9 667.50 -55.2 -50.7 -54.5 66 -99 SPO 1997 10 29 11 27 76 4.9 -9 667.50 -55.1 -50.7 -54.5 64 -99 SPO 1997 10 29 11 28 76 4.8 -9 667.50 -55.1 -50.6 -54.4 64 -99 SPO 1997 10 29 11 29 76 4.8 -9 667.50 -55.0 -50.7 -54.4 64 -99 SPO 1997 10 29 11 30 77 4.8 -9 667.50 -55.0 -50.6 -54.3 65 -99 SPO 1997 10 29 11 31 78 4.7 -9 667.50 -55.0 -50.5 -54.4 65 -99 SPO 1997 10 29 11 32 78 4.7 -9 667.50 -55.0 -50.6 -54.3 66 -99 SPO 1997 10 29 11 33 79 4.7 -9 667.50 -55.0 -50.6 -54.3 66 -99 SPO 1997 10 29 11 34 79 4.7 -9 667.50 -55.0 -50.6 -54.3 66 -99 SPO 1997 10 29 11 35 79 4.8 -9 667.50 -55.0 -50.7 -54.2 66 -99 SPO 1997 10 29 11 36 80 4.8 -9 667.50 -55.0 -50.8 -54.2 67 -99 SPO 1997 10 29 11 37 80 4.8 -9 667.50 -55.0 -50.8 -54.2 67 -99 SPO 1997 10 29 11 38 79 4.9 -9 667.40 -55.0 -50.8 -54.2 67 -99 SPO 1997 10 29 11 39 78 4.9 -9 667.40 -55.0 -50.7 -54.2 66 -99 SPO 1997 10 29 11 40 78 4.9 -9 667.40 -55.0 -50.6 -54.2 66 -99 SPO 1997 10 29 11 41 78 4.8 -9 667.40 -55.0 -50.6 -54.2 66 -99 SPO 1997 10 29 11 42 78 4.8 -9 667.40 -55.0 -50.6 -54.2 66 -99 SPO 1997 10 29 11 43 79 4.7 -9 667.40 -55.0 -50.6 -54.2 66 -99 SPO 1997 10 29 11 44 80 4.7 -9 667.40 -55.1 -50.6 -54.1 66 -99 SPO 1997 10 29 11 45 80 4.7 -9 667.40 -55.1 -50.5 -54.2 67 -99 SPO 1997 10 29 11 46 81 4.7 -9 667.40 -55.1 -50.5 -54.1 67 -99 SPO 1997 10 29 11 47 81 4.7 -9 667.40 -55.1 -50.5 -54.1 67 -99 SPO 1997 10 29 11 48 81 4.6 -9 667.40 -55.1 -50.5 -54.1 67 -99 SPO 1997 10 29 11 49 81 4.6 -9 667.40 -55.0 -50.4 -54.1 66 -99 SPO 1997 10 29 11 50 81 4.6 -9 667.40 -55.0 -50.4 -54.1 66 -99 SPO 1997 10 29 11 51 80 4.7 -9 667.40 -55.0 -50.4 -54.1 66 -99 SPO 1997 10 29 11 52 79 4.8 -9 667.30 -55.0 -50.2 -54.1 66 -99 SPO 1997 10 29 11 53 79 4.7 -9 667.30 -55.0 -49.8 -54.1 66 -99 SPO 1997 10 29 11 54 79 4.7 -9 667.30 -55.0 -49.5 -54.1 66 -99 SPO 1997 10 29 11 55 79 4.6 -9 667.30 -55.0 -49.2 -54.1 66 -99 SPO 1997 10 29 11 56 78 4.6 -9 667.30 -55.0 -48.9 -54.1 66 -99 SPO 1997 10 29 11 57 77 4.6 -9 667.30 -55.1 -48.9 -54.1 66 -99 SPO 1997 10 29 11 58 77 4.5 -9 667.30 -55.0 -48.9 -54.0 66 -99 SPO 1997 10 29 11 59 76 4.5 -9 667.30 -55.1 -48.8 -54.0 66 -99 SPO 1997 10 29 12 00 76 4.5 -9 667.30 -55.1 -49.0 -54.0 66 0 SPO 1997 10 29 12 01 77 4.5 -9 667.30 -55.1 -49.4 -53.9 66 -99 SPO 1997 10 29 12 02 77 4.4 -9 667.30 -55.1 -49.8 -53.9 66 -99 SPO 1997 10 29 12 03 79 4.2 -9 667.30 -55.2 -50.2 -53.9 67 -99 SPO 1997 10 29 12 04 80 4.0 -9 667.40 -55.2 -50.6 -53.8 67 -99 SPO 1997 10 29 12 05 81 4.0 -9 667.40 -55.2 -50.7 -53.8 66 -99 SPO 1997 10 29 12 06 82 4.0 -9 667.40 -55.3 -50.8 -53.8 67 -99 SPO 1997 10 29 12 07 83 4.0 -9 667.40 -55.3 -50.9 -53.8 67 -99 SPO 1997 10 29 12 08 84 4.0 -9 667.30 -55.2 -50.9 -53.8 66 -99 SPO 1997 10 29 12 09 84 3.9 -9 667.40 -55.2 -50.9 -53.8 66 -99 SPO 1997 10 29 12 10 84 3.9 -9 667.30 -55.2 -51.0 -53.7 66 -99 SPO 1997 10 29 12 11 85 3.8 -9 667.30 -55.2 -51.0 -53.7 66 -99 SPO 1997 10 29 12 12 87 3.7 -9 667.30 -55.2 -50.9 -53.7 66 -99 SPO 1997 10 29 12 13 88 3.8 -9 667.40 -55.2 -50.9 -53.7 66 -99 SPO 1997 10 29 12 14 88 3.9 -9 667.30 -55.2 -50.9 -53.7 66 -99 SPO 1997 10 29 12 15 88 3.9 -9 667.30 -55.2 -50.9 -53.8 66 -99 SPO 1997 10 29 12 16 86 4.0 -9 667.30 -55.2 -50.8 -53.8 67 -99 SPO 1997 10 29 12 17 85 4.1 -9 667.30 -55.2 -50.7 -53.8 67 -99 SPO 1997 10 29 12 18 85 4.1 -9 667.30 -55.2 -50.6 -53.8 67 -99 SPO 1997 10 29 12 19 84 4.1 -9 667.30 -55.2 -50.7 -53.8 66 -99 SPO 1997 10 29 12 20 83 4.2 -9 667.30 -55.3 -50.7 -53.8 67 -99 SPO 1997 10 29 12 21 82 4.2 -9 667.30 -55.2 -50.7 -53.8 66 -99 SPO 1997 10 29 12 22 81 4.3 -9 667.30 -55.2 -50.6 -53.8 67 -99 SPO 1997 10 29 12 23 82 4.2 -9 667.30 -55.0 -50.5 -53.7 66 -99 SPO 1997 10 29 12 24 82 4.2 -9 667.30 -55.0 -50.4 -53.7 67 -99 SPO 1997 10 29 12 25 84 4.2 -9 667.30 -55.0 -50.3 -53.7 67 -99 SPO 1997 10 29 12 26 84 4.3 -9 667.30 -55.0 -50.2 -53.7 67 -99 SPO 1997 10 29 12 27 84 4.3 -9 667.30 -55.1 -50.1 -53.8 67 -99 SPO 1997 10 29 12 28 84 4.3 -9 667.30 -55.0 -50.0 -53.8 66 -99 SPO 1997 10 29 12 29 85 4.3 -9 667.30 -55.0 -50.0 -53.8 66 -99 SPO 1997 10 29 12 30 85 4.3 -9 667.30 -55.1 -50.0 -53.8 68 -99 SPO 1997 10 29 12 31 85 4.3 -9 667.30 -55.1 -50.1 -53.8 67 -99 SPO 1997 10 29 12 32 84 4.3 -9 667.30 -55.1 -50.2 -53.8 67 -99 SPO 1997 10 29 12 33 83 4.3 -9 667.30 -55.2 -50.2 -53.9 68 -99 SPO 1997 10 29 12 34 83 4.3 -9 667.30 -55.1 -50.3 -53.9 68 -99 SPO 1997 10 29 12 35 84 4.2 -9 667.30 -55.1 -50.3 -53.8 68 -99 SPO 1997 10 29 12 36 85 4.1 -9 667.30 -55.1 -50.3 -53.8 68 -99 SPO 1997 10 29 12 37 84 4.1 -9 667.30 -55.1 -50.3 -53.8 68 -99 SPO 1997 10 29 12 38 85 4.1 -9 667.30 -55.2 -50.4 -53.8 69 -99 SPO 1997 10 29 12 39 85 4.0 -9 667.30 -55.2 -50.4 -53.9 69 -99 SPO 1997 10 29 12 40 87 3.9 -9 667.30 -55.2 -50.3 -53.8 68 -99 SPO 1997 10 29 12 41 88 3.7 -9 667.30 -55.2 -50.4 -53.8 67 -99 SPO 1997 10 29 12 42 88 3.7 -9 667.30 -55.2 -50.4 -53.8 66 -99 SPO 1997 10 29 12 43 89 3.7 -9 667.30 -55.2 -50.4 -53.8 66 -99 SPO 1997 10 29 12 44 90 3.7 -9 667.30 -55.3 -50.4 -53.9 66 -99 SPO 1997 10 29 12 45 91 3.7 -9 667.30 -55.3 -50.6 -53.9 66 -99 SPO 1997 10 29 12 46 92 3.7 -9 667.30 -55.4 -50.8 -54.0 68 -99 SPO 1997 10 29 12 47 92 3.8 -9 667.30 -55.5 -50.8 -54.0 69 -99 SPO 1997 10 29 12 48 91 3.8 -9 667.30 -55.5 -50.8 -54.1 69 -99 SPO 1997 10 29 12 49 91 3.7 -9 667.30 -55.5 -50.7 -54.1 69 -99 SPO 1997 10 29 12 50 92 3.6 -9 667.30 -55.5 -50.7 -54.1 69 -99 SPO 1997 10 29 12 51 92 3.6 -9 667.30 -55.5 -50.8 -54.1 69 -99 SPO 1997 10 29 12 52 92 3.6 -9 667.30 -55.5 -50.8 -54.1 69 -99 SPO 1997 10 29 12 53 91 3.6 -9 667.30 -55.5 -50.7 -54.1 69 -99 SPO 1997 10 29 12 54 91 3.6 -9 667.30 -55.5 -50.7 -54.1 68 -99 SPO 1997 10 29 12 55 91 3.6 -9 667.30 -55.5 -50.6 -54.1 66 -99 SPO 1997 10 29 12 56 92 3.5 -9 667.30 -55.5 -50.7 -54.1 66 -99 SPO 1997 10 29 12 57 92 3.5 -9 667.30 -55.6 -50.6 -54.2 67 -99 SPO 1997 10 29 12 58 91 3.5 -9 667.30 -55.6 -50.5 -54.1 67 -99 SPO 1997 10 29 12 59 92 3.4 -9 667.30 -55.5 -50.5 -54.1 66 -99 SPO 1997 10 29 13 00 93 3.4 -9 667.30 -55.5 -50.5 -54.0 67 0 SPO 1997 10 29 13 01 93 3.4 -9 667.30 -55.5 -50.6 -54.0 67 -99 SPO 1997 10 29 13 02 92 3.4 -9 667.20 -55.5 -50.5 -54.0 67 -99 SPO 1997 10 29 13 03 91 3.5 -9 667.20 -55.5 -50.4 -54.0 67 -99 SPO 1997 10 29 13 04 91 3.5 -9 667.20 -55.5 -50.3 -54.0 67 -99 SPO 1997 10 29 13 05 90 3.5 -9 667.20 -55.6 -50.2 -54.0 68 -99 SPO 1997 10 29 13 06 90 3.5 -9 667.20 -55.5 -50.2 -54.0 66 -99 SPO 1997 10 29 13 07 90 3.5 -9 667.20 -55.6 -50.2 -54.0 66 -99 SPO 1997 10 29 13 08 90 3.5 -9 667.20 -55.6 -50.3 -54.0 66 -99 SPO 1997 10 29 13 09 90 3.5 -9 667.20 -55.6 -50.4 -54.0 66 -99 SPO 1997 10 29 13 10 89 3.5 -9 667.20 -55.6 -50.4 -54.1 66 -99 SPO 1997 10 29 13 11 89 3.5 -9 667.20 -55.7 -50.4 -54.0 68 -99 SPO 1997 10 29 13 12 89 3.4 -9 667.10 -55.7 -50.2 -54.0 68 -99 SPO 1997 10 29 13 13 88 3.4 -9 667.10 -55.7 -50.2 -54.0 68 -99 SPO 1997 10 29 13 14 87 3.5 -9 667.10 -55.7 -50.1 -53.9 68 -99 SPO 1997 10 29 13 15 88 3.5 -9 667.10 -55.7 -50.0 -53.9 68 -99 SPO 1997 10 29 13 16 88 3.5 -9 667.10 -55.7 -50.0 -53.9 68 -99 SPO 1997 10 29 13 17 86 3.5 -9 667.10 -55.7 -50.0 -53.9 68 -99 SPO 1997 10 29 13 18 84 3.5 -9 667.10 -55.6 -49.9 -53.9 67 -99 SPO 1997 10 29 13 19 84 3.5 -9 667.10 -55.6 -49.8 -53.8 68 -99 SPO 1997 10 29 13 20 84 3.5 -9 667.10 -55.5 -49.8 -53.8 67 -99 SPO 1997 10 29 13 21 83 3.5 -9 667.10 -55.5 -49.9 -53.8 67 -99 SPO 1997 10 29 13 22 82 3.5 -9 667.10 -55.6 -49.7 -53.8 68 -99 SPO 1997 10 29 13 23 81 3.6 -9 667.10 -55.6 -49.6 -53.8 68 -99 SPO 1997 10 29 13 24 81 3.5 -9 667.10 -55.6 -49.6 -53.7 67 -99 SPO 1997 10 29 13 25 81 3.6 -9 667.10 -55.7 -49.6 -53.7 67 -99 SPO 1997 10 29 13 26 80 3.6 -9 667.10 -55.7 -49.5 -53.8 67 -99 SPO 1997 10 29 13 27 80 3.6 -9 667.10 -55.7 -49.6 -53.8 66 -99 SPO 1997 10 29 13 28 80 3.6 -9 667.10 -55.7 -49.6 -53.8 66 -99 SPO 1997 10 29 13 29 80 3.7 -9 667.10 -55.7 -49.6 -53.8 66 -99 SPO 1997 10 29 13 30 79 3.7 -9 667.10 -55.7 -49.6 -53.8 66 -99 SPO 1997 10 29 13 31 79 3.6 -9 667.10 -55.7 -49.6 -53.7 67 -99 SPO 1997 10 29 13 32 79 3.7 -9 667.10 -55.7 -49.6 -53.7 67 -99 SPO 1997 10 29 13 33 80 3.7 -9 667.10 -55.7 -49.7 -53.7 68 -99 SPO 1997 10 29 13 34 80 3.7 -9 667.10 -55.7 -49.8 -53.7 68 -99 SPO 1997 10 29 13 35 79 3.7 -9 667.10 -55.7 -49.9 -53.7 68 -99 SPO 1997 10 29 13 36 81 3.8 -9 667.00 -55.8 -49.8 -53.8 69 -99 SPO 1997 10 29 13 37 83 3.7 -9 667.00 -55.8 -49.8 -53.8 69 -99 SPO 1997 10 29 13 38 82 3.8 -9 667.00 -55.7 -49.8 -53.9 68 -99 SPO 1997 10 29 13 39 83 3.8 -9 667.00 -55.7 -49.7 -53.9 68 -99 SPO 1997 10 29 13 40 82 3.9 -9 667.00 -55.7 -49.6 -53.9 69 -99 SPO 1997 10 29 13 41 81 3.9 -9 667.00 -55.7 -49.6 -54.0 68 -99 SPO 1997 10 29 13 42 80 3.9 -9 667.00 -55.7 -49.5 -54.2 68 -99 SPO 1997 10 29 13 43 80 4.0 -9 667.00 -55.8 -49.4 -54.3 68 -99 SPO 1997 10 29 13 44 81 3.9 -9 667.00 -55.7 -49.4 -54.4 66 -99 SPO 1997 10 29 13 45 80 3.9 -9 667.00 -55.7 -49.3 -54.4 67 -99 SPO 1997 10 29 13 46 80 3.9 -9 667.00 -55.6 -49.5 -54.4 67 -99 SPO 1997 10 29 13 47 80 4.0 -9 667.00 -55.7 -49.4 -54.4 68 -99 SPO 1997 10 29 13 48 81 4.2 -9 667.00 -55.8 -49.3 -54.4 69 -99 SPO 1997 10 29 13 49 80 4.3 -9 666.90 -55.8 -49.2 -54.5 69 -99 SPO 1997 10 29 13 50 81 4.4 -9 667.00 -55.8 -49.0 -54.6 68 -99 SPO 1997 10 29 13 51 81 4.6 -9 666.90 -55.8 -48.9 -54.6 68 -99 SPO 1997 10 29 13 52 82 4.8 -9 666.90 -55.7 -48.8 -54.7 67 -99 SPO 1997 10 29 13 53 82 5.0 -9 666.90 -55.6 -48.7 -54.6 66 -99 SPO 1997 10 29 13 54 82 5.2 -9 666.90 -55.6 -48.7 -54.6 66 -99 SPO 1997 10 29 13 55 83 5.3 -9 666.90 -55.5 -48.7 -54.6 66 -99 SPO 1997 10 29 13 56 83 5.4 -9 666.90 -55.5 -48.6 -54.6 66 -99 SPO 1997 10 29 13 57 83 5.3 -9 666.90 -55.5 -48.6 -54.6 67 -99 SPO 1997 10 29 13 58 83 5.3 -9 666.90 -55.5 -48.6 -54.6 66 -99 SPO 1997 10 29 13 59 84 5.2 -9 666.90 -55.5 -48.6 -54.6 66 -99 SPO 1997 10 29 14 00 85 5.1 -9 666.90 -55.5 -48.7 -54.6 65 0 SPO 1997 10 29 14 01 85 5.0 -9 666.90 -55.5 -48.7 -54.7 65 -99 SPO 1997 10 29 14 02 85 4.9 -9 666.90 -55.6 -48.7 -54.7 66 -99 SPO 1997 10 29 14 03 85 4.8 -9 666.90 -55.6 -48.8 -54.7 66 -99 SPO 1997 10 29 14 04 86 4.7 -9 666.90 -55.7 -48.9 -54.7 66 -99 SPO 1997 10 29 14 05 86 4.5 -9 666.90 -55.7 -48.9 -54.8 66 -99 SPO 1997 10 29 14 06 86 4.5 -9 666.90 -55.7 -49.0 -54.8 66 -99 SPO 1997 10 29 14 07 86 4.4 -9 666.90 -55.7 -49.1 -54.8 66 -99 SPO 1997 10 29 14 08 86 4.3 -9 666.90 -55.8 -49.2 -54.8 67 -99 SPO 1997 10 29 14 09 87 4.3 -9 666.90 -55.8 -49.4 -54.8 66 -99 SPO 1997 10 29 14 10 87 4.3 -9 666.90 -55.8 -49.4 -54.8 66 -99 SPO 1997 10 29 14 11 88 4.2 -9 666.90 -55.7 -49.4 -54.8 65 -99 SPO 1997 10 29 14 12 88 4.1 -9 666.90 -55.8 -49.6 -54.8 65 -99 SPO 1997 10 29 14 13 88 4.2 -9 666.90 -55.8 -49.6 -54.7 64 -99 SPO 1997 10 29 14 14 89 4.2 -9 666.90 -55.8 -49.5 -54.7 63 -99 SPO 1997 10 29 14 15 88 4.1 -9 666.90 -55.9 -49.5 -54.7 64 -99 SPO 1997 10 29 14 16 88 4.1 -9 666.90 -55.9 -49.6 -54.7 63 -99 SPO 1997 10 29 14 17 88 4.1 -9 666.90 -55.9 -49.6 -54.7 64 -99 SPO 1997 10 29 14 18 89 4.2 -9 666.90 -55.9 -49.6 -54.7 64 -99 SPO 1997 10 29 14 19 89 4.2 -9 666.90 -56.0 -49.7 -54.6 65 -99 SPO 1997 10 29 14 20 88 4.1 -9 666.90 -56.0 -49.8 -54.7 65 -99 SPO 1997 10 29 14 21 89 4.0 -9 666.90 -56.0 -50.0 -54.7 65 -99 SPO 1997 10 29 14 22 89 4.1 -9 666.90 -56.0 -50.0 -54.7 65 -99 SPO 1997 10 29 14 23 89 4.0 -9 666.90 -56.0 -50.1 -54.7 64 -99 SPO 1997 10 29 14 24 88 3.9 -9 666.90 -56.0 -50.1 -54.7 64 -99 SPO 1997 10 29 14 25 88 3.9 -9 666.80 -56.0 -50.1 -54.7 64 -99 SPO 1997 10 29 14 26 88 4.0 -9 666.90 -56.0 -50.1 -54.8 65 -99 SPO 1997 10 29 14 27 89 4.1 -9 666.80 -55.9 -50.0 -54.8 64 -99 SPO 1997 10 29 14 28 90 4.2 -9 666.90 -55.9 -49.9 -54.8 63 -99 SPO 1997 10 29 14 29 91 4.2 -9 666.80 -56.0 -49.9 -54.8 64 -99 SPO 1997 10 29 14 30 91 4.2 -9 666.80 -56.0 -49.9 -54.8 64 -99 SPO 1997 10 29 14 31 92 4.2 -9 666.80 -56.0 -49.9 -54.8 63 -99 SPO 1997 10 29 14 32 93 4.2 -9 666.80 -56.0 -49.9 -54.8 64 -99 SPO 1997 10 29 14 33 93 4.3 -9 666.80 -55.9 -49.9 -54.8 63 -99 SPO 1997 10 29 14 34 93 4.3 -9 666.80 -55.9 -49.8 -54.8 64 -99 SPO 1997 10 29 14 35 92 4.4 -9 666.80 -55.9 -49.9 -54.8 64 -99 SPO 1997 10 29 14 36 92 4.4 -9 666.80 -55.9 -50.0 -54.8 64 -99 SPO 1997 10 29 14 37 92 4.5 -9 666.80 -55.9 -49.9 -54.8 64 -99 SPO 1997 10 29 14 38 92 4.5 -9 666.80 -56.0 -50.0 -54.8 65 -99 SPO 1997 10 29 14 39 92 4.5 -9 666.80 -56.0 -50.0 -54.8 65 -99 SPO 1997 10 29 14 40 93 4.5 -9 666.80 -56.0 -50.0 -54.8 65 -99 SPO 1997 10 29 14 41 93 4.5 -9 666.80 -55.9 -50.1 -54.8 65 -99 SPO 1997 10 29 14 42 93 4.5 -9 666.80 -55.9 -50.1 -54.8 65 -99 SPO 1997 10 29 14 43 93 4.5 -9 666.80 -55.9 -50.2 -54.7 65 -99 SPO 1997 10 29 14 44 93 4.5 -9 666.80 -55.8 -50.2 -54.7 63 -99 SPO 1997 10 29 14 45 93 4.4 -9 666.80 -55.8 -50.2 -54.7 63 -99 SPO 1997 10 29 14 46 93 4.4 -9 666.80 -55.7 -50.2 -54.7 62 -99 SPO 1997 10 29 14 47 93 4.4 -9 666.80 -55.7 -50.2 -54.6 63 -99 SPO 1997 10 29 14 48 93 4.3 -9 666.80 -55.7 -50.4 -54.6 65 -99 SPO 1997 10 29 14 49 94 4.2 -9 666.80 -55.7 -50.5 -54.6 65 -99 SPO 1997 10 29 14 50 94 4.2 -9 666.80 -55.8 -50.7 -54.6 65 -99 SPO 1997 10 29 14 51 94 4.2 -9 666.80 -55.9 -50.8 -54.6 65 -99 SPO 1997 10 29 14 52 94 4.2 -9 666.80 -55.9 -50.9 -54.6 65 -99 SPO 1997 10 29 14 53 94 4.2 -9 666.80 -55.9 -50.8 -54.6 65 -99 SPO 1997 10 29 14 54 96 4.3 -9 666.80 -55.9 -50.8 -54.6 65 -99 SPO 1997 10 29 14 55 96 4.3 -9 666.80 -55.8 -50.8 -54.6 64 -99 SPO 1997 10 29 14 56 96 4.4 -9 666.80 -55.8 -51.0 -54.6 64 -99 SPO 1997 10 29 14 57 96 4.4 -9 666.80 -55.9 -51.3 -54.6 65 -99 SPO 1997 10 29 14 58 96 4.4 -9 666.80 -55.9 -51.3 -54.6 63 -99 SPO 1997 10 29 14 59 96 4.4 -9 666.80 -55.9 -51.0 -54.6 63 -99 SPO 1997 10 29 15 00 96 4.3 -9 666.80 -55.9 -50.8 -54.6 63 0 SPO 1997 10 29 15 01 95 4.4 -9 666.80 -55.9 -50.6 -54.6 63 -99 SPO 1997 10 29 15 02 94 4.5 -9 666.80 -55.9 -50.4 -54.6 63 -99 SPO 1997 10 29 15 03 93 4.5 -9 666.80 -55.9 -50.3 -54.6 63 -99 SPO 1997 10 29 15 04 93 4.5 -9 666.80 -55.9 -50.2 -54.7 64 -99 SPO 1997 10 29 15 05 94 4.5 -9 666.80 -55.9 -50.2 -54.7 64 -99 SPO 1997 10 29 15 06 93 4.4 -9 666.80 -55.9 -50.1 -54.7 64 -99 SPO 1997 10 29 15 07 94 4.5 -9 666.80 -55.9 -50.2 -54.7 64 -99 SPO 1997 10 29 15 08 94 4.5 -9 666.80 -55.9 -50.2 -54.7 64 -99 SPO 1997 10 29 15 09 94 4.5 -9 666.80 -55.9 -50.3 -54.7 64 -99 SPO 1997 10 29 15 10 95 4.6 -9 666.80 -55.9 -50.3 -54.6 64 -99 SPO 1997 10 29 15 11 96 4.6 -9 666.80 -55.9 -50.2 -54.6 64 -99 SPO 1997 10 29 15 12 97 4.6 -9 666.80 -55.9 -50.4 -54.6 64 -99 SPO 1997 10 29 15 13 98 4.6 -9 666.80 -55.9 -50.4 -54.6 63 -99 SPO 1997 10 29 15 14 98 4.6 -9 666.80 -55.8 -50.4 -54.6 62 -99 SPO 1997 10 29 15 15 99 4.6 -9 666.80 -55.8 -50.3 -54.6 62 -99 SPO 1997 10 29 15 16 99 4.6 -9 666.80 -55.8 -50.3 -54.6 63 -99 SPO 1997 10 29 15 17 99 4.6 -9 666.80 -55.8 -50.2 -54.6 64 -99 SPO 1997 10 29 15 18 99 4.6 -9 666.80 -55.8 -50.2 -54.6 64 -99 SPO 1997 10 29 15 19 99 4.5 -9 666.70 -55.8 -50.3 -54.6 64 -99 SPO 1997 10 29 15 20 99 4.5 -9 666.80 -55.8 -50.3 -54.6 65 -99 SPO 1997 10 29 15 21 99 4.5 -9 666.70 -55.7 -50.4 -54.5 64 -99 SPO 1997 10 29 15 22 99 4.4 -9 666.70 -55.7 -50.4 -54.5 64 -99 SPO 1997 10 29 15 23 98 4.5 -9 666.70 -55.7 -50.4 -54.5 64 -99 SPO 1997 10 29 15 24 97 4.5 -9 666.70 -55.7 -50.3 -54.6 64 -99 SPO 1997 10 29 15 25 97 4.4 -9 666.70 -55.7 -50.2 -54.6 64 -99 SPO 1997 10 29 15 26 96 4.5 -9 666.60 -55.7 -50.3 -54.6 65 -99 SPO 1997 10 29 15 27 96 4.4 -9 666.60 -55.7 -50.3 -54.5 65 -99 SPO 1997 10 29 15 28 96 4.4 -9 666.60 -55.8 -50.3 -54.5 64 -99 SPO 1997 10 29 15 29 96 4.4 -9 666.60 -55.8 -50.2 -54.6 64 -99 SPO 1997 10 29 15 30 96 4.4 -9 666.60 -55.8 -50.2 -54.6 63 -99 SPO 1997 10 29 15 31 96 4.4 -9 666.60 -55.8 -50.1 -54.6 64 -99 SPO 1997 10 29 15 32 96 4.3 -9 666.60 -55.8 -50.0 -54.5 64 -99 SPO 1997 10 29 15 33 96 4.3 -9 666.60 -55.7 -50.0 -54.5 64 -99 SPO 1997 10 29 15 34 96 4.3 -9 666.60 -55.7 -50.1 -54.5 65 -99 SPO 1997 10 29 15 35 97 4.2 -9 666.60 -55.6 -50.1 -54.4 64 -99 SPO 1997 10 29 15 36 97 4.1 -9 666.60 -55.6 -50.0 -54.4 64 -99 SPO 1997 10 29 15 37 98 4.0 -9 666.60 -55.6 -50.0 -54.4 64 -99 SPO 1997 10 29 15 38 98 4.0 -9 666.60 -55.6 -50.0 -54.4 65 -99 SPO 1997 10 29 15 39 98 4.0 -9 666.60 -55.6 -49.9 -54.3 65 -99 SPO 1997 10 29 15 40 97 3.9 -9 666.60 -55.6 -49.8 -54.4 64 -99 SPO 1997 10 29 15 41 97 3.9 -9 666.60 -55.6 -49.8 -54.3 64 -99 SPO 1997 10 29 15 42 96 4.0 -9 666.60 -55.6 -49.7 -54.3 63 -99 SPO 1997 10 29 15 43 96 3.9 -9 666.60 -55.6 -49.6 -54.3 62 -99 SPO 1997 10 29 15 44 96 3.9 -9 666.60 -55.7 -49.6 -54.3 65 -99 SPO 1997 10 29 15 45 97 3.9 -9 666.60 -55.7 -49.5 -54.3 65 -99 SPO 1997 10 29 15 46 97 3.9 -9 666.60 -55.6 -49.5 -54.3 65 -99 SPO 1997 10 29 15 47 98 3.8 -9 666.60 -55.7 -49.4 -54.3 65 -99 SPO 1997 10 29 15 48 98 3.8 -9 666.60 -55.8 -49.4 -54.3 66 -99 SPO 1997 10 29 15 49 99 3.7 -9 666.50 -55.7 -49.5 -54.3 65 -99 SPO 1997 10 29 15 50 99 3.6 -9 666.60 -55.7 -49.4 -54.3 65 -99 SPO 1997 10 29 15 51 100 3.6 -9 666.60 -55.7 -49.4 -54.3 65 -99 SPO 1997 10 29 15 52 100 3.6 -9 666.60 -55.6 -49.4 -54.3 65 -99 SPO 1997 10 29 15 53 102 3.6 -9 666.60 -55.7 -49.4 -54.4 65 -99 SPO 1997 10 29 15 54 104 3.6 -9 666.60 -55.7 -49.6 -54.4 65 -99 SPO 1997 10 29 15 55 104 3.6 -9 666.60 -55.7 -49.6 -54.5 64 -99 SPO 1997 10 29 15 56 105 3.7 -9 666.60 -55.7 -49.6 -54.5 63 -99 SPO 1997 10 29 15 57 105 3.6 -9 666.50 -55.8 -49.6 -54.5 64 -99 SPO 1997 10 29 15 58 105 3.7 -9 666.60 -55.7 -49.6 -54.5 63 -99 SPO 1997 10 29 15 59 104 3.7 -9 666.50 -55.8 -49.5 -54.5 65 -99 SPO 1997 10 29 16 00 103 3.8 -9 666.50 -55.8 -49.4 -54.5 65 0 SPO 1997 10 29 16 01 103 3.8 -9 666.50 -55.7 -49.3 -54.4 64 -99 SPO 1997 10 29 16 02 103 3.8 -9 666.50 -55.7 -49.3 -54.5 64 -99 SPO 1997 10 29 16 03 104 3.8 -9 666.50 -55.7 -49.4 -54.5 64 -99 SPO 1997 10 29 16 04 103 3.9 -9 666.50 -55.7 -49.4 -54.4 64 -99 SPO 1997 10 29 16 05 102 4.0 -9 666.50 -55.7 -49.4 -54.4 64 -99 SPO 1997 10 29 16 06 103 4.0 -9 666.50 -55.7 -49.4 -54.4 64 -99 SPO 1997 10 29 16 07 102 4.0 -9 666.50 -55.8 -49.4 -54.4 65 -99 SPO 1997 10 29 16 08 102 4.0 -9 666.50 -55.8 -49.3 -54.4 64 -99 SPO 1997 10 29 16 09 102 4.0 -9 666.50 -55.7 -49.2 -54.4 63 -99 SPO 1997 10 29 16 10 102 4.0 -9 666.50 -55.7 -49.2 -54.4 62 -99 SPO 1997 10 29 16 11 103 3.9 -9 666.50 -55.6 -49.2 -54.3 62 -99 SPO 1997 10 29 16 12 103 3.9 -9 666.50 -55.6 -49.2 -54.3 62 -99 SPO 1997 10 29 16 13 103 3.9 -9 666.50 -55.7 -49.3 -54.3 63 -99 SPO 1997 10 29 16 14 103 3.9 -9 666.50 -55.7 -49.3 -54.4 64 -99 SPO 1997 10 29 16 15 102 3.8 -9 666.40 -55.7 -49.3 -54.4 64 -99 SPO 1997 10 29 16 16 102 3.8 -9 666.40 -55.8 -49.2 -54.4 64 -99 SPO 1997 10 29 16 17 100 3.8 -9 666.40 -55.8 -49.2 -54.4 64 -99 SPO 1997 10 29 16 18 99 3.9 -9 666.40 -55.7 -49.2 -54.3 63 -99 SPO 1997 10 29 16 19 98 3.9 -9 666.40 -55.8 -49.2 -54.3 64 -99 SPO 1997 10 29 16 20 97 3.9 -9 666.40 -55.7 -49.0 -54.3 63 -99 SPO 1997 10 29 16 21 97 3.9 -9 666.40 -55.7 -49.0 -54.3 62 -99 SPO 1997 10 29 16 22 96 3.8 -9 666.40 -55.7 -49.0 -54.3 62 -99 SPO 1997 10 29 16 23 96 3.8 -9 666.40 -55.7 -49.0 -54.2 62 -99 SPO 1997 10 29 16 24 96 3.8 -9 666.40 -55.7 -49.1 -54.2 62 -99 SPO 1997 10 29 16 25 96 3.6 -9 666.40 -55.8 -49.2 -54.2 63 -99 SPO 1997 10 29 16 26 96 3.4 -9 666.40 -55.8 -49.3 -54.2 63 -99 SPO 1997 10 29 16 27 95 3.1 -9 666.40 -55.8 -49.5 -54.1 64 -99 SPO 1997 10 29 16 28 94 2.6 -9 666.40 -55.9 -49.8 -53.9 65 -99 SPO 1997 10 29 16 29 93 1.8 -9 666.40 -55.8 -50.5 -53.6 65 -99 SPO 1997 10 29 16 30 94 1.7 -9 666.40 -55.8 -51.2 -53.3 65 -99 SPO 1997 10 29 16 31 95 2.1 -9 666.40 -55.7 -50.9 -53.1 65 -99 SPO 1997 10 29 16 32 94 2.3 -9 666.40 -55.6 -50.3 -52.9 65 -99 SPO 1997 10 29 16 33 94 1.5 -9 666.40 -55.6 -50.7 -52.7 66 -99 SPO 1997 10 29 16 34 98 0.6 -9 666.50 -55.6 -52.6 -52.4 67 -99 SPO 1997 10 29 16 35 92 0.5 -9 666.50 -55.5 -53.7 -52.4 69 -99 SPO 1997 10 29 16 36 94 0.8 -9 666.50 -55.3 -53.8 -52.0 70 -99 SPO 1997 10 29 16 37 97 1.2 -9 666.50 -55.3 -53.6 -51.4 70 -99 SPO 1997 10 29 16 38 96 1.2 -9 666.50 -55.4 -53.4 -51.2 70 -99 SPO 1997 10 29 16 39 100 0.6 -9 666.50 -55.2 -53.8 -50.8 68 -99 SPO 1997 10 29 16 40 87 0.3 -9 666.50 -55.2 -54.1 -50.2 69 -99 SPO 1997 10 29 16 41 84 0.6 -9 666.40 -55.3 -54.2 -50.0 70 -99 SPO 1997 10 29 16 42 87 1.2 -9 666.40 -55.3 -54.0 -50.3 71 -99 SPO 1997 10 29 16 43 89 1.5 -9 666.40 -55.3 -53.4 -51.0 71 -99 SPO 1997 10 29 16 44 89 1.6 -9 666.40 -55.4 -53.0 -51.4 71 -99 SPO 1997 10 29 16 45 86 1.3 -9 666.40 -55.5 -53.2 -51.8 70 -99 SPO 1997 10 29 16 46 84 1.1 -9 666.40 -55.5 -53.7 -52.0 70 -99 SPO 1997 10 29 16 47 79 0.9 -9 666.40 -55.4 -54.0 -51.8 69 -99 SPO 1997 10 29 16 48 84 1.2 -9 666.40 -55.4 -54.0 -51.9 69 -99 SPO 1997 10 29 16 49 90 1.6 -9 666.40 -55.5 -53.5 -52.0 70 -99 SPO 1997 10 29 16 50 94 1.8 -9 666.40 -55.4 -52.7 -51.6 69 -99 SPO 1997 10 29 16 51 94 1.7 -9 666.40 -55.5 -52.7 -51.4 69 -99 SPO 1997 10 29 16 52 95 1.5 -9 666.40 -55.6 -53.2 -51.0 70 -99 SPO 1997 10 29 16 53 95 1.3 -9 666.40 -55.4 -53.7 -50.6 68 -99 SPO 1997 10 29 16 54 95 1.4 -9 666.40 -55.4 -53.8 -50.5 69 -99 SPO 1997 10 29 16 55 95 1.7 -9 666.40 -55.5 -53.6 -50.4 70 -99 SPO 1997 10 29 16 56 96 1.9 -9 666.40 -55.6 -53.3 -50.3 71 -99 SPO 1997 10 29 16 57 99 2.0 -9 666.40 -55.5 -52.2 -50.2 70 -99 SPO 1997 10 29 16 58 100 2.1 -9 666.40 -55.4 -51.2 -50.3 67 -99 SPO 1997 10 29 16 59 100 2.2 -9 666.40 -55.4 -50.7 -50.6 65 -99 SPO 1997 10 29 17 00 101 2.2 -9 666.40 -55.4 -50.8 -50.9 65 0 SPO 1997 10 29 17 01 101 2.2 -9 666.40 -55.4 -51.6 -51.0 65 -99 SPO 1997 10 29 17 02 102 2.1 -9 666.40 -55.6 -52.5 -51.0 66 -99 SPO 1997 10 29 17 03 101 2.1 -9 666.40 -55.7 -53.0 -50.9 66 -99 SPO 1997 10 29 17 04 100 2.2 -9 666.40 -55.9 -52.9 -50.8 68 -99 SPO 1997 10 29 17 05 98 2.3 -9 666.40 -56.0 -52.8 -50.8 69 -99 SPO 1997 10 29 17 06 98 2.4 -9 666.40 -56.0 -51.6 -50.9 69 -99 SPO 1997 10 29 17 07 97 2.6 -9 666.40 -56.0 -50.7 -51.2 69 -99 SPO 1997 10 29 17 08 97 2.7 -9 666.40 -56.0 -50.3 -51.6 69 -99 SPO 1997 10 29 17 09 96 2.8 -9 666.40 -56.1 -50.1 -52.0 69 -99 SPO 1997 10 29 17 10 96 2.9 -9 666.40 -56.0 -49.9 -52.2 68 -99 SPO 1997 10 29 17 11 97 2.9 -9 666.40 -56.0 -49.8 -52.4 67 -99 SPO 1997 10 29 17 12 97 2.9 -9 666.40 -56.0 -49.8 -52.6 66 -99 SPO 1997 10 29 17 13 97 2.9 -9 666.40 -56.0 -49.8 -52.6 66 -99 SPO 1997 10 29 17 14 96 2.9 -9 666.40 -55.9 -49.8 -52.7 65 -99 SPO 1997 10 29 17 15 95 2.9 -9 666.40 -55.9 -49.8 -52.8 65 -99 SPO 1997 10 29 17 16 94 2.9 -9 666.40 -55.9 -49.8 -52.8 65 -99 SPO 1997 10 29 17 17 93 3.0 -9 666.40 -55.9 -49.8 -52.9 64 -99 SPO 1997 10 29 17 18 93 3.0 -9 666.30 -55.9 -49.9 -53.0 64 -99 SPO 1997 10 29 17 19 93 3.0 -9 666.40 -55.9 -49.9 -53.0 64 -99 SPO 1997 10 29 17 20 92 3.1 -9 666.30 -55.9 -49.9 -53.1 65 -99 SPO 1997 10 29 17 21 90 3.1 -9 666.40 -55.8 -49.8 -53.1 65 -99 SPO 1997 10 29 17 22 89 3.2 -9 666.30 -55.9 -49.8 -53.2 65 -99 SPO 1997 10 29 17 23 88 3.2 -9 666.40 -55.9 -49.7 -53.3 66 -99 SPO 1997 10 29 17 24 87 3.2 -9 666.40 -55.9 -49.8 -53.4 66 -99 SPO 1997 10 29 17 25 87 3.2 -9 666.40 -56.0 -49.9 -53.5 66 -99 SPO 1997 10 29 17 26 87 3.2 -9 666.40 -55.9 -49.9 -53.5 65 -99 SPO 1997 10 29 17 27 87 3.1 -9 666.40 -55.9 -49.9 -53.5 65 -99 SPO 1997 10 29 17 28 85 3.1 -9 666.40 -55.9 -50.0 -53.5 66 -99 SPO 1997 10 29 17 29 84 3.0 -9 666.40 -55.8 -50.1 -53.6 66 -99 SPO 1997 10 29 17 30 83 3.0 -9 666.40 -56.0 -50.1 -53.6 68 -99 SPO 1997 10 29 17 31 82 3.0 -9 666.40 -56.0 -50.1 -53.8 68 -99 SPO 1997 10 29 17 32 82 3.1 -9 666.40 -56.0 -50.2 -54.0 68 -99 SPO 1997 10 29 17 33 83 3.3 -9 666.40 -56.0 -50.2 -54.1 67 -99 SPO 1997 10 29 17 34 84 3.5 -9 666.40 -56.0 -50.2 -54.1 67 -99 SPO 1997 10 29 17 35 85 3.7 -9 666.40 -56.0 -50.4 -54.1 66 -99 SPO 1997 10 29 17 36 83 3.8 -9 666.40 -55.9 -50.4 -54.2 66 -99 SPO 1997 10 29 17 37 81 3.7 -9 666.40 -55.8 -50.4 -54.3 66 -99 SPO 1997 10 29 17 38 80 3.6 -9 666.40 -55.8 -50.4 -54.4 66 -99 SPO 1997 10 29 17 39 79 3.6 -9 666.40 -55.8 -50.5 -54.4 67 -99 SPO 1997 10 29 17 40 77 3.5 -9 666.40 -55.8 -50.5 -54.5 67 -99 SPO 1997 10 29 17 41 77 3.6 -9 666.40 -55.9 -50.6 -54.5 69 -99 SPO 1997 10 29 17 42 76 3.5 -9 666.40 -55.9 -50.6 -54.5 69 -99 SPO 1997 10 29 17 43 76 3.5 -9 666.40 -55.9 -50.8 -54.6 68 -99 SPO 1997 10 29 17 44 77 3.5 -9 666.40 -56.0 -50.9 -54.6 69 -99 SPO 1997 10 29 17 45 77 3.6 -9 666.40 -56.0 -50.9 -54.5 68 -99 SPO 1997 10 29 17 46 77 3.5 -9 666.40 -55.9 -51.0 -54.5 67 -99 SPO 1997 10 29 17 47 76 3.5 -9 666.40 -55.9 -51.0 -54.5 66 -99 SPO 1997 10 29 17 48 74 3.5 -9 666.40 -55.9 -51.0 -54.5 66 -99 SPO 1997 10 29 17 49 74 3.4 -9 666.40 -56.0 -51.2 -54.6 67 -99 SPO 1997 10 29 17 50 74 3.4 -9 666.40 -56.0 -51.0 -54.6 67 -99 SPO 1997 10 29 17 51 75 3.4 -9 666.40 -56.0 -50.8 -54.6 67 -99 SPO 1997 10 29 17 52 75 3.3 -9 666.40 -56.0 -50.7 -54.6 68 -99 SPO 1997 10 29 17 53 76 3.3 -9 666.40 -56.0 -50.6 -54.7 68 -99 SPO 1997 10 29 17 54 77 3.3 -9 666.40 -56.1 -50.6 -54.7 69 -99 SPO 1997 10 29 17 55 79 3.3 -9 666.40 -56.1 -50.6 -54.8 69 -99 SPO 1997 10 29 17 56 80 3.3 -9 666.40 -56.0 -50.6 -54.7 68 -99 SPO 1997 10 29 17 57 80 3.2 -9 666.40 -56.1 -50.6 -54.7 69 -99 SPO 1997 10 29 17 58 80 3.2 -9 666.40 -56.1 -50.6 -54.6 68 -99 SPO 1997 10 29 17 59 80 3.2 -9 666.40 -56.1 -50.6 -54.6 67 -99 SPO 1997 10 29 18 00 81 3.1 -9 666.40 -56.1 -50.7 -54.5 67 0 SPO 1997 10 29 18 01 82 3.0 -9 666.40 -56.1 -50.8 -54.4 66 -99 SPO 1997 10 29 18 02 84 3.0 -9 666.40 -56.1 -50.8 -54.2 65 -99 SPO 1997 10 29 18 03 86 3.0 -9 666.40 -56.1 -50.9 -54.1 65 -99 SPO 1997 10 29 18 04 89 2.9 -9 666.40 -56.1 -51.0 -53.8 65 -99 SPO 1997 10 29 18 05 91 2.9 -9 666.40 -56.1 -51.0 -53.7 65 -99 SPO 1997 10 29 18 06 91 2.8 -9 666.40 -56.1 -51.1 -53.6 65 -99 SPO 1997 10 29 18 07 91 2.8 -9 666.40 -56.1 -51.1 -53.6 65 -99 SPO 1997 10 29 18 08 92 2.8 -9 666.40 -56.1 -51.2 -53.6 66 -99 SPO 1997 10 29 18 09 94 2.8 -9 666.50 -56.1 -51.1 -53.6 66 -99 SPO 1997 10 29 18 10 96 2.8 -9 666.50 -56.0 -51.1 -53.7 65 -99 SPO 1997 10 29 18 11 95 2.8 -9 666.50 -56.1 -51.2 -53.9 66 -99 SPO 1997 10 29 18 12 93 2.6 -9 666.50 -56.1 -51.3 -54.1 66 -99 SPO 1997 10 29 18 13 93 2.6 -9 666.50 -56.1 -51.3 -54.2 67 -99 SPO 1997 10 29 18 14 93 2.6 -9 666.50 -56.0 -51.3 -54.2 66 -99 SPO 1997 10 29 18 15 93 2.5 -9 666.50 -56.0 -51.3 -54.2 66 -99 SPO 1997 10 29 18 16 94 2.6 -9 666.50 -56.0 -51.3 -54.2 65 -99 SPO 1997 10 29 18 17 96 2.5 -9 666.50 -56.0 -51.4 -54.2 65 -99 SPO 1997 10 29 18 18 97 2.5 -9 666.50 -56.0 -51.4 -54.1 65 -99 SPO 1997 10 29 18 19 98 2.4 -9 666.50 -56.1 -51.3 -54.0 66 -99 SPO 1997 10 29 18 20 98 2.4 -9 666.50 -56.0 -51.3 -54.2 66 -99 SPO 1997 10 29 18 21 97 2.3 -9 666.50 -56.0 -51.2 -54.2 67 -99 SPO 1997 10 29 18 22 93 2.4 -9 666.50 -56.0 -51.2 -54.3 67 -99 SPO 1997 10 29 18 23 93 2.4 -9 666.40 -56.0 -51.2 -54.3 67 -99 SPO 1997 10 29 18 24 92 2.5 -9 666.40 -56.0 -51.4 -54.3 68 -99 SPO 1997 10 29 18 25 93 2.5 -9 666.40 -56.1 -51.4 -54.4 69 -99 SPO 1997 10 29 18 26 95 2.3 -9 666.40 -56.2 -51.4 -54.4 69 -99 SPO 1997 10 29 18 27 96 2.2 -9 666.40 -56.2 -51.5 -54.4 69 -99 SPO 1997 10 29 18 28 97 2.2 -9 666.40 -56.2 -51.6 -54.3 69 -99 SPO 1997 10 29 18 29 96 2.2 -9 666.40 -56.3 -51.6 -54.3 69 -99 SPO 1997 10 29 18 30 96 2.2 -9 666.40 -56.2 -51.6 -54.4 68 -99 SPO 1997 10 29 18 31 98 2.3 -9 666.40 -56.2 -51.6 -54.4 67 -99 SPO 1997 10 29 18 32 98 2.2 -9 666.40 -56.2 -51.6 -54.3 66 -99 SPO 1997 10 29 18 33 98 2.2 -9 666.40 -56.2 -51.6 -54.2 65 -99 SPO 1997 10 29 18 34 99 2.2 -9 666.40 -56.3 -51.7 -54.2 66 -99 SPO 1997 10 29 18 35 100 2.2 -9 666.40 -56.4 -51.9 -54.0 67 -99 SPO 1997 10 29 18 36 101 2.2 -9 666.40 -56.4 -52.0 -53.8 67 -99 SPO 1997 10 29 18 37 103 2.1 -9 666.40 -56.5 -52.2 -53.6 68 -99 SPO 1997 10 29 18 38 103 2.1 -9 666.40 -56.5 -52.2 -53.4 67 -99 SPO 1997 10 29 18 39 103 2.1 -9 666.40 -56.5 -52.1 -53.3 67 -99 SPO 1997 10 29 18 40 104 2.1 -9 666.40 -56.5 -52.0 -53.3 67 -99 SPO 1997 10 29 18 41 106 2.1 -9 666.40 -56.5 -52.1 -53.3 67 -99 SPO 1997 10 29 18 42 108 2.1 -9 666.40 -56.6 -52.3 -53.3 68 -99 SPO 1997 10 29 18 43 111 2.0 -9 666.40 -56.6 -52.4 -53.3 68 -99 SPO 1997 10 29 18 44 114 1.9 -9 666.40 -56.6 -52.4 -53.4 68 -99 SPO 1997 10 29 18 45 121 1.9 -9 666.40 -56.6 -52.6 -53.6 67 -99 SPO 1997 10 29 18 46 116 2.0 -9 666.40 -56.6 -52.8 -53.7 67 -99 SPO 1997 10 29 18 47 114 2.0 -9 666.40 -56.7 -52.9 -53.8 66 -99 SPO 1997 10 29 18 48 115 1.9 -9 666.40 -56.8 -53.1 -54.0 66 -99 SPO 1997 10 29 18 49 118 2.0 -9 666.40 -56.8 -53.1 -54.2 65 -99 SPO 1997 10 29 18 50 119 2.0 -9 666.40 -56.7 -53.1 -54.2 65 -99 SPO 1997 10 29 18 51 117 2.0 -9 666.40 -56.6 -53.1 -54.0 65 -99 SPO 1997 10 29 18 52 112 2.1 -9 666.40 -56.8 -52.9 -53.8 67 -99 SPO 1997 10 29 18 53 110 2.2 -9 666.40 -56.8 -52.6 -53.7 68 -99 SPO 1997 10 29 18 54 109 2.2 -9 666.40 -56.8 -52.5 -53.6 67 -99 SPO 1997 10 29 18 55 109 2.2 -9 666.40 -56.8 -52.6 -53.6 67 -99 SPO 1997 10 29 18 56 108 2.3 -9 666.40 -56.8 -52.8 -53.5 67 -99 SPO 1997 10 29 18 57 107 2.2 -9 666.40 -56.8 -53.0 -53.5 67 -99 SPO 1997 10 29 18 58 107 2.2 -9 666.40 -56.8 -53.2 -53.5 67 -99 SPO 1997 10 29 18 59 106 2.2 -9 666.40 -56.8 -53.3 -53.6 67 -99 SPO 1997 10 29 19 00 105 2.2 -9 666.40 -56.8 -53.4 -53.6 67 0 SPO 1997 10 29 19 01 105 2.2 -9 666.40 -56.7 -53.3 -53.6 66 -99 SPO 1997 10 29 19 02 106 2.2 -9 666.40 -56.7 -53.3 -53.6 66 -99 SPO 1997 10 29 19 03 106 2.3 -9 666.40 -56.7 -53.3 -53.6 65 -99 SPO 1997 10 29 19 04 105 2.3 -9 666.40 -56.7 -53.2 -53.6 65 -99 SPO 1997 10 29 19 05 105 2.4 -9 666.40 -56.7 -53.2 -53.5 66 -99 SPO 1997 10 29 19 06 103 2.5 -9 666.40 -56.7 -53.0 -53.4 67 -99 SPO 1997 10 29 19 07 102 2.6 -9 666.40 -56.7 -52.8 -53.3 67 -99 SPO 1997 10 29 19 08 102 2.7 -9 666.40 -56.7 -52.5 -53.3 67 -99 SPO 1997 10 29 19 09 102 2.7 -9 666.40 -56.8 -52.3 -53.4 68 -99 SPO 1997 10 29 19 10 103 2.7 -9 666.40 -56.8 -52.2 -53.6 68 -99 SPO 1997 10 29 19 11 105 2.6 -9 666.40 -56.8 -52.1 -53.8 68 -99 SPO 1997 10 29 19 12 105 2.6 -9 666.40 -56.6 -52.1 -53.9 66 -99 SPO 1997 10 29 19 13 106 2.6 -9 666.40 -56.5 -52.1 -53.8 66 -99 SPO 1997 10 29 19 14 108 2.6 -9 666.40 -56.4 -52.1 -53.9 65 -99 SPO 1997 10 29 19 15 108 2.5 -9 666.40 -56.3 -52.1 -53.9 66 -99 SPO 1997 10 29 19 16 109 2.5 -9 666.40 -56.2 -52.2 -53.9 65 -99 SPO 1997 10 29 19 17 109 2.4 -9 666.40 -56.2 -52.2 -53.9 66 -99 SPO 1997 10 29 19 18 108 2.3 -9 666.40 -56.3 -52.5 -53.8 67 -99 SPO 1997 10 29 19 19 107 2.2 -9 666.40 -56.3 -52.6 -53.6 67 -99 SPO 1997 10 29 19 20 107 2.2 -9 666.40 -56.2 -52.3 -53.4 67 -99 SPO 1997 10 29 19 21 107 2.2 -9 666.40 -56.2 -52.2 -53.4 67 -99 SPO 1997 10 29 19 22 107 2.1 -9 666.30 -56.2 -52.2 -53.3 68 -99 SPO 1997 10 29 19 23 107 2.1 -9 666.30 -56.3 -52.5 -53.2 69 -99 SPO 1997 10 29 19 24 107 2.1 -9 666.40 -56.2 -52.7 -53.1 68 -99 SPO 1997 10 29 19 25 109 2.1 -9 666.40 -56.2 -52.8 -53.2 69 -99 SPO 1997 10 29 19 26 110 2.1 -9 666.40 -56.2 -52.8 -53.2 69 -99 SPO 1997 10 29 19 27 111 2.0 -9 666.40 -56.1 -53.1 -53.2 69 -99 SPO 1997 10 29 19 28 112 2.0 -9 666.40 -56.0 -53.4 -53.4 69 -99 SPO 1997 10 29 19 29 112 1.9 -9 666.40 -55.8 -53.6 -53.4 68 -99 SPO 1997 10 29 19 30 113 1.9 -9 666.40 -55.6 -53.7 -53.4 67 -99 SPO 1997 10 29 19 31 115 1.8 -9 666.40 -55.5 -53.8 -53.4 68 -99 SPO 1997 10 29 19 32 116 1.9 -9 666.40 -55.5 -53.9 -53.4 68 -99 SPO 1997 10 29 19 33 117 1.9 -9 666.40 -55.6 -53.9 -53.4 67 -99 SPO 1997 10 29 19 34 118 1.8 -9 666.40 -55.6 -53.9 -53.4 66 -99 SPO 1997 10 29 19 35 118 1.6 -9 666.40 -55.6 -53.8 -53.2 65 -99 SPO 1997 10 29 19 36 119 1.6 -9 666.40 -55.6 -53.8 -53.1 65 -99 SPO 1997 10 29 19 37 120 1.8 -9 666.40 -55.6 -53.7 -53.2 65 -99 SPO 1997 10 29 19 38 121 1.9 -9 666.40 -55.6 -53.5 -53.4 65 -99 SPO 1997 10 29 19 39 121 1.9 -9 666.40 -55.6 -53.2 -53.3 65 -99 SPO 1997 10 29 19 40 122 1.8 -9 666.40 -55.5 -53.0 -53.3 65 -99 SPO 1997 10 29 19 41 123 1.8 -9 666.40 -55.5 -52.9 -53.3 65 -99 SPO 1997 10 29 19 42 124 2.0 -9 666.40 -55.6 -52.8 -53.4 66 -99 SPO 1997 10 29 19 43 125 2.1 -9 666.40 -55.6 -52.6 -53.5 65 -99 SPO 1997 10 29 19 44 125 2.1 -9 666.40 -55.5 -52.4 -53.5 65 -99 SPO 1997 10 29 19 45 123 2.0 -9 666.40 -55.5 -52.4 -53.5 65 -99 SPO 1997 10 29 19 46 121 2.0 -9 666.40 -55.6 -52.4 -53.5 65 -99 SPO 1997 10 29 19 47 121 2.0 -9 666.40 -55.4 -52.3 -53.5 65 -99 SPO 1997 10 29 19 48 121 2.0 -9 666.40 -55.4 -52.4 -53.5 65 -99 SPO 1997 10 29 19 49 121 2.1 -9 666.40 -55.3 -52.6 -53.5 65 -99 SPO 1997 10 29 19 50 120 2.1 -9 666.40 -55.4 -52.4 -53.6 66 -99 SPO 1997 10 29 19 51 120 2.1 -9 666.40 -55.3 -52.6 -53.6 66 -99 SPO 1997 10 29 19 52 119 2.0 -9 666.40 -55.2 -52.6 -53.6 66 -99 SPO 1997 10 29 19 53 119 1.9 -9 666.40 -55.2 -52.6 -53.5 66 -99 SPO 1997 10 29 19 54 119 1.9 -9 666.40 -55.4 -52.4 -53.5 68 -99 SPO 1997 10 29 19 55 118 1.9 -9 666.40 -55.5 -52.3 -53.5 68 -99 SPO 1997 10 29 19 56 116 1.8 -9 666.40 -55.4 -52.2 -53.5 67 -99 SPO 1997 10 29 19 57 116 1.7 -9 666.30 -55.5 -52.1 -53.5 67 -99 SPO 1997 10 29 19 58 114 1.7 -9 666.30 -55.4 -52.0 -53.5 66 -99 SPO 1997 10 29 19 59 112 1.8 -9 666.30 -55.4 -52.0 -53.4 66 -99 SPO 1997 10 29 20 00 110 1.8 -9 666.30 -55.5 -51.9 -53.4 68 0 SPO 1997 10 29 20 01 110 1.8 -9 666.30 -55.5 -52.1 -53.4 68 -99 SPO 1997 10 29 20 02 109 1.8 -9 666.30 -55.6 -52.2 -53.4 70 -99 SPO 1997 10 29 20 03 109 1.8 -9 666.30 -55.6 -52.2 -53.4 70 -99 SPO 1997 10 29 20 04 109 1.8 -9 666.30 -55.5 -52.2 -53.5 69 -99 SPO 1997 10 29 20 05 110 1.8 -9 666.30 -55.5 -52.4 -53.4 69 -99 SPO 1997 10 29 20 06 111 1.8 -9 666.30 -55.5 -52.6 -53.4 69 -99 SPO 1997 10 29 20 07 112 1.8 -9 666.30 -55.5 -52.7 -53.4 68 -99 SPO 1997 10 29 20 08 113 1.7 -9 666.30 -55.5 -52.8 -53.4 68 -99 SPO 1997 10 29 20 09 114 1.6 -9 666.30 -55.5 -53.0 -53.2 68 -99 SPO 1997 10 29 20 10 118 1.6 -9 666.30 -55.5 -53.1 -53.2 68 -99 SPO 1997 10 29 20 11 116 1.6 -9 666.30 -55.5 -53.1 -53.2 68 -99 SPO 1997 10 29 20 12 117 1.6 -9 666.30 -55.5 -52.9 -53.2 68 -99 SPO 1997 10 29 20 13 116 1.6 -9 666.30 -55.6 -52.9 -53.3 70 -99 SPO 1997 10 29 20 14 115 1.7 -9 666.30 -55.6 -52.8 -53.2 70 -99 SPO 1997 10 29 20 15 115 1.7 -9 666.30 -55.4 -52.8 -53.3 68 -99 SPO 1997 10 29 20 16 115 1.8 -9 666.30 -55.4 -52.7 -53.3 69 -99 SPO 1997 10 29 20 17 114 1.8 -9 666.30 -55.3 -52.8 -53.3 69 -99 SPO 1997 10 29 20 18 114 1.8 -9 666.30 -55.3 -53.0 -53.4 70 -99 SPO 1997 10 29 20 19 112 1.9 -9 666.30 -55.3 -53.1 -53.3 70 -99 SPO 1997 10 29 20 20 110 2.0 -9 666.30 -55.2 -52.8 -53.2 70 -99 SPO 1997 10 29 20 21 107 2.0 -9 666.30 -55.2 -52.6 -53.2 71 -99 SPO 1997 10 29 20 22 105 2.0 -9 666.30 -55.2 -52.7 -53.2 71 -99 SPO 1997 10 29 20 23 103 2.1 -9 666.30 -55.3 -52.6 -53.2 70 -99 SPO 1997 10 29 20 24 101 2.1 -9 666.20 -55.6 -52.2 -53.1 72 -99 SPO 1997 10 29 20 25 101 2.2 -9 666.20 -56.0 -52.0 -53.2 74 -99 SPO 1997 10 29 20 26 99 2.2 -9 666.20 -56.3 -51.9 -53.2 75 -99 SPO 1997 10 29 20 27 99 2.2 -9 666.20 -56.4 -51.9 -53.2 74 -99 SPO 1997 10 29 20 28 99 2.3 -9 666.30 -56.5 -51.8 -53.2 73 -99 SPO 1997 10 29 20 29 99 2.4 -9 666.20 -56.6 -51.8 -53.2 73 -99 SPO 1997 10 29 20 30 98 2.4 -9 666.20 -56.6 -51.7 -53.1 73 -99 SPO 1997 10 29 20 31 99 2.3 -9 666.20 -56.6 -51.8 -53.1 72 -99 SPO 1997 10 29 20 32 99 2.3 -9 666.20 -56.5 -51.8 -53.1 70 -99 SPO 1997 10 29 20 33 98 2.3 -9 666.20 -56.5 -51.8 -53.1 70 -99 SPO 1997 10 29 20 34 98 2.4 -9 666.20 -56.5 -51.7 -53.2 71 -99 SPO 1997 10 29 20 35 98 2.3 -9 666.20 -56.6 -51.6 -53.2 71 -99 SPO 1997 10 29 20 36 98 2.3 -9 666.20 -56.6 -51.6 -53.2 71 -99 SPO 1997 10 29 20 37 99 2.3 -9 666.20 -56.6 -51.5 -53.3 70 -99 SPO 1997 10 29 20 38 98 2.3 -9 666.20 -56.5 -51.4 -53.4 69 -99 SPO 1997 10 29 20 39 96 2.4 -9 666.20 -56.5 -51.5 -53.4 69 -99 SPO 1997 10 29 20 40 94 2.5 -9 666.20 -56.6 -51.4 -53.3 69 -99 SPO 1997 10 29 20 41 93 2.5 -9 666.20 -56.4 -51.3 -53.4 69 -99 SPO 1997 10 29 20 42 93 2.5 -9 666.20 -56.4 -51.3 -53.5 69 -99 SPO 1997 10 29 20 43 91 2.5 -9 666.20 -56.4 -51.4 -53.5 69 -99 SPO 1997 10 29 20 44 91 2.5 -9 666.30 -56.4 -51.4 -53.5 69 -99 SPO 1997 10 29 20 45 92 2.4 -9 666.30 -56.4 -51.4 -53.5 70 -99 SPO 1997 10 29 20 46 92 2.4 -9 666.30 -56.3 -51.4 -53.5 69 -99 SPO 1997 10 29 20 47 91 2.4 -9 666.30 -56.3 -51.4 -53.5 70 -99 SPO 1997 10 29 20 48 91 2.4 -9 666.30 -56.2 -51.4 -53.4 69 -99 SPO 1997 10 29 20 49 91 2.3 -9 666.30 -56.3 -51.4 -53.3 70 -99 SPO 1997 10 29 20 50 91 2.3 -9 666.30 -56.3 -51.4 -53.2 71 -99 SPO 1997 10 29 20 51 92 2.3 -9 666.30 -56.2 -51.4 -53.2 70 -99 SPO 1997 10 29 20 52 91 2.3 -9 666.30 -56.0 -51.4 -53.1 69 -99 SPO 1997 10 29 20 53 90 2.2 -9 666.30 -56.0 -51.4 -53.0 69 -99 SPO 1997 10 29 20 54 89 2.2 -9 666.30 -56.0 -51.4 -53.0 69 -99 SPO 1997 10 29 20 55 87 2.3 -9 666.30 -55.7 -51.4 -52.9 67 -99 SPO 1997 10 29 20 56 84 2.3 -9 666.30 -55.6 -51.4 -53.1 67 -99 SPO 1997 10 29 20 57 82 2.3 -9 666.20 -55.4 -51.2 -53.3 67 -99 SPO 1997 10 29 20 58 80 2.4 -9 666.20 -55.2 -51.2 -53.5 67 -99 SPO 1997 10 29 20 59 79 2.5 -9 666.20 -55.2 -51.2 -53.6 69 -99 SPO 1997 10 29 21 00 79 2.6 -9 666.20 -55.5 -51.2 -53.7 72 0 SPO 1997 10 29 21 01 79 2.5 -9 666.20 -55.6 -51.1 -53.8 72 -99 SPO 1997 10 29 21 02 80 2.6 -9 666.20 -55.5 -51.1 -53.7 71 -99 SPO 1997 10 29 21 03 82 2.7 -9 666.20 -55.5 -51.1 -53.8 70 -99 SPO 1997 10 29 21 04 82 2.8 -9 666.20 -55.4 -51.1 -53.8 70 -99 SPO 1997 10 29 21 05 81 2.8 -9 666.20 -55.6 -51.1 -53.9 70 -99 SPO 1997 10 29 21 06 83 2.9 -9 666.20 -55.7 -51.1 -54.0 71 -99 SPO 1997 10 29 21 07 84 3.0 -9 666.20 -55.7 -51.2 -54.0 70 -99 SPO 1997 10 29 21 08 85 3.0 -9 666.20 -55.8 -51.2 -54.1 70 -99 SPO 1997 10 29 21 09 85 3.0 -9 666.20 -55.9 -51.2 -54.2 70 -99 SPO 1997 10 29 21 10 85 3.1 -9 666.20 -55.9 -51.2 -54.2 70 -99 SPO 1997 10 29 21 11 85 3.3 -9 666.20 -56.0 -51.2 -54.4 71 -99 SPO 1997 10 29 21 12 84 3.3 -9 666.20 -56.0 -51.2 -54.5 70 -99 SPO 1997 10 29 21 13 84 3.5 -9 666.10 -56.0 -51.2 -54.6 70 -99 SPO 1997 10 29 21 14 85 3.6 -9 666.10 -56.0 -51.2 -54.6 70 -99 SPO 1997 10 29 21 15 84 3.6 -9 666.10 -55.9 -51.2 -54.6 69 -99 SPO 1997 10 29 21 16 84 3.7 -9 666.10 -55.9 -51.2 -54.7 69 -99 SPO 1997 10 29 21 17 85 3.7 -9 666.10 -55.9 -51.2 -54.7 69 -99 SPO 1997 10 29 21 18 85 3.9 -9 666.10 -56.0 -51.2 -54.8 70 -99 SPO 1997 10 29 21 19 85 3.9 -9 666.10 -56.0 -51.2 -54.8 70 -99 SPO 1997 10 29 21 20 85 3.9 -9 666.10 -56.0 -51.2 -54.8 69 -99 SPO 1997 10 29 21 21 86 3.9 -9 666.10 -56.1 -51.2 -54.8 69 -99 SPO 1997 10 29 21 22 86 4.0 -9 666.10 -56.1 -51.2 -54.8 69 -99 SPO 1997 10 29 21 23 87 3.9 -9 666.10 -56.1 -51.2 -54.8 69 -99 SPO 1997 10 29 21 24 87 4.0 -9 666.10 -56.1 -51.2 -54.9 69 -99 SPO 1997 10 29 21 25 88 4.0 -9 666.10 -56.1 -51.2 -54.9 69 -99 SPO 1997 10 29 21 26 88 4.0 -9 666.10 -56.1 -51.2 -55.0 69 -99 SPO 1997 10 29 21 27 88 4.0 -9 666.10 -56.1 -51.2 -55.0 69 -99 SPO 1997 10 29 21 28 88 4.1 -9 666.10 -56.1 -51.2 -55.0 69 -99 SPO 1997 10 29 21 29 88 4.1 -9 666.10 -56.1 -51.2 -55.1 69 -99 SPO 1997 10 29 21 30 88 4.0 -9 666.10 -56.2 -51.2 -55.1 71 -99 SPO 1997 10 29 21 31 90 4.0 -9 666.00 -56.2 -51.2 -55.1 71 -99 SPO 1997 10 29 21 32 90 4.0 -9 666.00 -56.3 -51.2 -55.1 72 -99 SPO 1997 10 29 21 33 90 4.0 -9 666.00 -56.3 -51.2 -55.1 71 -99 SPO 1997 10 29 21 34 90 3.9 -9 666.00 -56.2 -51.2 -55.0 70 -99 SPO 1997 10 29 21 35 92 3.9 -9 666.00 -56.2 -51.2 -55.0 69 -99 SPO 1997 10 29 21 36 92 3.8 -9 666.00 -56.2 -51.2 -54.9 69 -99 SPO 1997 10 29 21 37 93 3.8 -9 666.00 -56.2 -51.2 -54.8 69 -99 SPO 1997 10 29 21 38 93 3.8 -9 666.00 -56.3 -51.3 -54.8 69 -99 SPO 1997 10 29 21 39 94 3.7 -9 666.00 -56.3 -51.4 -54.8 69 -99 SPO 1997 10 29 21 40 95 3.7 -9 666.00 -56.3 -51.5 -54.8 69 -99 SPO 1997 10 29 21 41 96 3.7 -9 666.00 -56.4 -51.4 -54.8 70 -99 SPO 1997 10 29 21 42 96 3.7 -9 666.00 -56.4 -51.4 -54.8 70 -99 SPO 1997 10 29 21 43 97 3.8 -9 666.00 -56.4 -51.5 -54.8 70 -99 SPO 1997 10 29 21 44 97 3.8 -9 666.00 -56.4 -51.6 -54.8 70 -99 SPO 1997 10 29 21 45 97 3.9 -9 666.00 -56.4 -51.6 -54.8 70 -99 SPO 1997 10 29 21 46 97 3.9 -9 666.00 -56.4 -51.6 -54.9 70 -99 SPO 1997 10 29 21 47 97 3.9 -9 666.00 -56.4 -51.6 -54.9 69 -99 SPO 1997 10 29 21 48 98 3.9 -9 666.00 -56.4 -51.5 -55.0 69 -99 SPO 1997 10 29 21 49 99 3.9 -9 666.00 -56.3 -51.6 -55.0 68 -99 SPO 1997 10 29 21 50 100 3.9 -9 666.00 -56.3 -51.6 -55.0 68 -99 SPO 1997 10 29 21 51 101 3.9 -9 666.00 -56.3 -51.6 -55.0 69 -99 SPO 1997 10 29 21 52 102 4.0 -9 666.00 -56.3 -51.5 -55.0 69 -99 SPO 1997 10 29 21 53 103 4.0 -9 666.00 -56.3 -51.5 -55.0 69 -99 SPO 1997 10 29 21 54 105 3.9 -9 665.90 -56.3 -51.5 -55.0 70 -99 SPO 1997 10 29 21 55 106 3.9 -9 665.90 -56.3 -51.6 -55.0 71 -99 SPO 1997 10 29 21 56 108 3.9 -9 665.90 -56.3 -51.5 -55.0 71 -99 SPO 1997 10 29 21 57 109 3.8 -9 665.90 -56.3 -51.5 -55.0 71 -99 SPO 1997 10 29 21 58 109 3.8 -9 665.90 -56.3 -51.6 -55.0 71 -99 SPO 1997 10 29 21 59 109 3.8 -9 665.90 -56.3 -51.6 -55.0 71 -99 SPO 1997 10 29 22 00 109 3.8 -9 665.90 -56.3 -51.5 -55.0 71 0 SPO 1997 10 29 22 01 110 3.8 -9 665.90 -56.3 -51.5 -54.9 70 -99 SPO 1997 10 29 22 02 111 3.8 -9 665.90 -56.4 -51.5 -54.9 70 -99 SPO 1997 10 29 22 03 112 3.7 -9 665.90 -56.4 -51.6 -54.9 69 -99 SPO 1997 10 29 22 04 113 3.7 -9 665.90 -56.4 -51.7 -54.9 69 -99 SPO 1997 10 29 22 05 114 3.6 -9 665.90 -56.4 -51.8 -55.0 69 -99 SPO 1997 10 29 22 06 116 3.6 -9 665.90 -56.5 -52.1 -55.1 70 -99 SPO 1997 10 29 22 07 116 3.7 -9 665.90 -56.5 -52.4 -55.2 70 -99 SPO 1997 10 29 22 08 115 3.6 -9 665.90 -56.6 -52.8 -55.2 70 -99 SPO 1997 10 29 22 09 113 3.7 -9 665.90 -56.6 -52.8 -55.2 69 -99 SPO 1997 10 29 22 10 113 3.7 -9 665.90 -56.6 -52.8 -55.1 69 -99 SPO 1997 10 29 22 11 114 3.6 -9 665.90 -56.6 -52.9 -55.2 69 -99 SPO 1997 10 29 22 12 114 3.5 -9 665.90 -56.6 -53.0 -55.3 69 -99 SPO 1997 10 29 22 13 115 3.5 -9 665.90 -56.6 -53.3 -55.4 69 -99 SPO 1997 10 29 22 14 114 3.5 -9 665.90 -56.7 -53.5 -55.4 69 -99 SPO 1997 10 29 22 15 113 3.6 -9 665.90 -56.7 -53.5 -55.4 68 -99 SPO 1997 10 29 22 16 112 3.5 -9 665.90 -56.7 -53.5 -55.3 68 -99 SPO 1997 10 29 22 17 111 3.6 -9 665.90 -56.8 -53.5 -55.4 69 -99 SPO 1997 10 29 22 18 109 3.5 -9 665.90 -56.8 -53.0 -55.4 70 -99 SPO 1997 10 29 22 19 107 3.5 -9 665.80 -56.9 -52.5 -55.4 70 -99 SPO 1997 10 29 22 20 106 3.5 -9 665.80 -57.0 -52.2 -55.4 71 -99 SPO 1997 10 29 22 21 103 3.6 -9 665.80 -57.0 -52.0 -55.3 70 -99 SPO 1997 10 29 22 22 101 3.6 -9 665.80 -56.9 -51.9 -55.2 68 -99 SPO 1997 10 29 22 23 101 3.6 -9 665.80 -56.9 -51.9 -55.2 69 -99 SPO 1997 10 29 22 24 100 3.7 -9 665.80 -56.9 -51.8 -55.1 69 -99 SPO 1997 10 29 22 25 100 3.7 -9 665.80 -56.8 -51.8 -55.1 69 -99 SPO 1997 10 29 22 26 99 3.7 -9 665.80 -56.8 -51.8 -55.1 70 -99 SPO 1997 10 29 22 27 99 3.7 -9 665.80 -56.7 -51.7 -55.1 68 -99 SPO 1997 10 29 22 28 99 3.6 -9 665.80 -56.7 -51.7 -55.1 68 -99 SPO 1997 10 29 22 29 98 3.5 -9 665.80 -56.6 -51.7 -55.0 68 -99 SPO 1997 10 29 22 30 97 3.4 -9 665.80 -56.6 -51.6 -55.0 68 -99 SPO 1997 10 29 22 31 98 3.3 -9 665.80 -56.6 -51.6 -55.0 68 -99 SPO 1997 10 29 22 32 98 3.3 -9 665.80 -56.6 -51.6 -55.0 69 -99 SPO 1997 10 29 22 33 98 3.3 -9 665.80 -56.6 -51.6 -55.1 70 -99 SPO 1997 10 29 22 34 98 3.3 -9 665.80 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 35 98 3.4 -9 665.80 -56.5 -51.6 -55.1 70 -99 SPO 1997 10 29 22 36 97 3.4 -9 665.80 -56.5 -51.6 -55.0 70 -99 SPO 1997 10 29 22 37 96 3.4 -9 665.80 -56.5 -51.6 -55.0 71 -99 SPO 1997 10 29 22 38 94 3.4 -9 665.80 -56.5 -51.6 -55.0 71 -99 SPO 1997 10 29 22 39 94 3.4 -9 665.80 -56.5 -51.5 -55.1 71 -99 SPO 1997 10 29 22 40 92 3.4 -9 665.80 -56.5 -51.5 -55.1 70 -99 SPO 1997 10 29 22 41 91 3.4 -9 665.90 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 42 90 3.5 -9 665.90 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 43 89 3.5 -9 665.90 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 44 89 3.4 -9 665.90 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 45 90 3.4 -9 665.90 -56.5 -51.6 -55.1 69 -99 SPO 1997 10 29 22 46 90 3.3 -9 666.00 -56.5 -51.7 -55.0 69 -99 SPO 1997 10 29 22 47 89 3.2 -9 666.00 -56.5 -51.8 -54.9 69 -99 SPO 1997 10 29 22 48 89 3.1 -9 666.00 -56.5 -52.0 -54.8 70 -99 SPO 1997 10 29 22 49 88 3.0 -9 666.00 -56.5 -52.2 -54.8 70 -99 SPO 1997 10 29 22 50 89 3.0 -9 666.00 -56.5 -51.9 -54.7 70 -99 SPO 1997 10 29 22 51 89 2.9 -9 666.00 -56.6 -52.0 -54.6 71 -99 SPO 1997 10 29 22 52 89 2.9 -9 666.00 -56.6 -52.4 -54.5 71 -99 SPO 1997 10 29 22 53 89 2.9 -9 666.00 -56.6 -52.4 -54.5 71 -99 SPO 1997 10 29 22 54 87 3.0 -9 665.90 -56.5 -51.8 -54.8 70 -99 SPO 1997 10 29 22 55 85 3.0 -9 665.90 -56.4 -51.5 -55.1 69 -99 SPO 1997 10 29 22 56 82 3.0 -9 665.90 -56.4 -51.3 -55.3 69 -99 SPO 1997 10 29 22 57 81 3.1 -9 665.90 -56.4 -51.2 -55.4 69 -99 SPO 1997 10 29 22 58 81 3.2 -9 665.90 -56.4 -51.2 -55.4 69 -99 SPO 1997 10 29 22 59 82 3.2 -9 665.90 -56.4 -51.1 -55.4 69 -99 SPO 1997 10 29 23 00 83 3.2 -9 665.90 -56.5 -51.1 -55.4 71 0 SPO 1997 10 29 23 01 84 3.3 -9 665.90 -56.4 -51.0 -55.4 70 -99 SPO 1997 10 29 23 02 83 3.3 -9 665.90 -56.3 -51.0 -55.3 69 -99 SPO 1997 10 29 23 03 82 3.4 -9 665.90 -56.3 -51.0 -55.3 70 -99 SPO 1997 10 29 23 04 81 3.4 -9 665.90 -56.2 -50.9 -55.3 69 -99 SPO 1997 10 29 23 05 80 3.5 -9 665.90 -56.2 -50.9 -55.3 70 -99 SPO 1997 10 29 23 06 79 3.7 -9 665.80 -56.2 -50.8 -55.3 70 -99 SPO 1997 10 29 23 07 79 3.8 -9 665.80 -56.2 -50.7 -55.3 70 -99 SPO 1997 10 29 23 08 79 3.7 -9 665.80 -56.2 -50.8 -55.3 70 -99 SPO 1997 10 29 23 09 79 3.7 -9 665.80 -56.2 -50.8 -55.3 71 -99 SPO 1997 10 29 23 10 80 3.7 -9 665.80 -56.1 -50.8 -55.3 70 -99 SPO 1997 10 29 23 11 80 3.6 -9 665.80 -56.1 -50.9 -55.2 69 -99 SPO 1997 10 29 23 12 81 3.6 -9 665.80 -56.1 -50.9 -55.2 69 -99 SPO 1997 10 29 23 13 82 3.6 -9 665.80 -56.1 -50.9 -55.2 69 -99 SPO 1997 10 29 23 14 83 3.5 -9 665.80 -56.2 -50.9 -55.1 69 -99 SPO 1997 10 29 23 15 83 3.5 -9 665.80 -56.2 -50.9 -55.1 69 -99 SPO 1997 10 29 23 16 83 3.4 -9 665.80 -56.2 -50.9 -55.1 69 -99 SPO 1997 10 29 23 17 84 3.2 -9 665.80 -56.2 -50.9 -55.0 69 -99 SPO 1997 10 29 23 18 86 3.1 -9 665.80 -56.2 -51.0 -54.9 69 -99 SPO 1997 10 29 23 19 88 2.9 -9 665.80 -56.2 -51.0 -54.6 69 -99 SPO 1997 10 29 23 20 89 2.8 -9 665.80 -56.3 -51.0 -54.3 69 -99 SPO 1997 10 29 23 21 91 2.8 -9 665.80 -56.3 -51.1 -54.1 69 -99 SPO 1997 10 29 23 22 90 2.9 -9 665.80 -56.3 -51.1 -54.1 70 -99 SPO 1997 10 29 23 23 88 3.0 -9 665.80 -56.3 -51.1 -54.1 71 -99 SPO 1997 10 29 23 24 88 3.1 -9 665.80 -56.4 -51.0 -54.2 72 -99 SPO 1997 10 29 23 25 88 3.1 -9 665.80 -56.4 -51.0 -54.5 72 -99 SPO 1997 10 29 23 26 89 3.1 -9 665.80 -56.4 -51.1 -54.6 72 -99 SPO 1997 10 29 23 27 89 3.1 -9 665.80 -56.5 -51.2 -54.7 72 -99 SPO 1997 10 29 23 28 92 3.1 -9 665.80 -56.5 -51.2 -54.7 71 -99 SPO 1997 10 29 23 29 93 3.1 -9 665.80 -56.5 -51.4 -54.7 69 -99 SPO 1997 10 29 23 30 94 3.2 -9 665.80 -56.6 -51.4 -54.7 69 -99 SPO 1997 10 29 23 31 94 3.2 -9 665.80 -56.5 -51.4 -54.8 69 -99 SPO 1997 10 29 23 32 94 3.2 -9 665.80 -56.5 -51.4 -54.8 69 -99 SPO 1997 10 29 23 33 94 3.3 -9 665.80 -56.5 -51.4 -54.9 69 -99 SPO 1997 10 29 23 34 94 3.3 -9 665.80 -56.6 -51.4 -54.9 69 -99 SPO 1997 10 29 23 35 93 3.4 -9 665.80 -56.6 -51.4 -54.8 69 -99 SPO 1997 10 29 23 36 92 3.4 -9 665.80 -56.6 -51.3 -54.9 69 -99 SPO 1997 10 29 23 37 91 3.4 -9 665.80 -56.6 -51.3 -54.9 69 -99 SPO 1997 10 29 23 38 91 3.4 -9 665.70 -56.5 -51.2 -54.9 69 -99 SPO 1997 10 29 23 39 91 3.4 -9 665.70 -56.6 -51.2 -54.8 69 -99 SPO 1997 10 29 23 40 91 3.4 -9 665.70 -56.5 -51.2 -54.8 69 -99 SPO 1997 10 29 23 41 93 3.4 -9 665.70 -56.6 -51.3 -54.8 70 -99 SPO 1997 10 29 23 42 94 3.3 -9 665.70 -56.6 -51.3 -54.7 70 -99 SPO 1997 10 29 23 43 95 3.3 -9 665.70 -56.6 -51.3 -54.7 69 -99 SPO 1997 10 29 23 44 96 3.1 -9 665.70 -56.6 -51.4 -54.6 68 -99 SPO 1997 10 29 23 45 98 3.0 -9 665.70 -56.6 -51.6 -54.6 68 -99 SPO 1997 10 29 23 46 100 2.9 -9 665.70 -56.6 -51.8 -54.8 68 -99 SPO 1997 10 29 23 47 101 2.9 -9 665.70 -56.6 -52.1 -54.9 68 -99 SPO 1997 10 29 23 48 100 2.9 -9 665.70 -56.6 -52.4 -55.0 68 -99 SPO 1997 10 29 23 49 100 3.0 -9 665.70 -56.6 -52.4 -54.9 68 -99 SPO 1997 10 29 23 50 99 3.1 -9 665.70 -56.7 -52.0 -54.9 68 -99 SPO 1997 10 29 23 51 98 3.1 -9 665.70 -56.7 -51.8 -54.8 68 -99 SPO 1997 10 29 23 52 98 3.0 -9 665.70 -56.8 -52.0 -54.7 69 -99 SPO 1997 10 29 23 53 98 3.0 -9 665.70 -56.8 -52.0 -54.7 69 -99 SPO 1997 10 29 23 54 99 2.9 -9 665.70 -56.9 -52.0 -54.8 70 -99 SPO 1997 10 29 23 55 101 3.0 -9 665.70 -57.0 -52.2 -55.0 70 -99 SPO 1997 10 29 23 56 103 3.1 -9 665.70 -57.0 -52.4 -55.2 70 -99 SPO 1997 10 29 23 57 103 3.2 -9 665.70 -57.1 -52.4 -55.4 70 -99 SPO 1997 10 29 23 58 104 3.2 -9 665.70 -57.1 -52.3 -55.5 -99 -99 SPO 1997 10 29 23 59 104 3.2 -9 665.70 -57.1 -52.2 -55.5 -99 -99 SPO 1997 10 30 00 00 105 3.1 -9 665.70 -57.1 -52.2 -55.4 -99 0 SPO 1997 10 30 00 01 104 3.1 -9 665.70 -57.1 -52.2 -55.4 -99 -99 SPO 1997 10 30 00 02 103 3.1 -9 665.70 -57.1 -52.1 -55.2 -99 -99 SPO 1997 10 30 00 03 101 3.2 -9 665.70 -57.1 -51.7 -55.1 67 -99 SPO 1997 10 30 00 04 99 3.3 -9 665.70 -57.0 -51.2 -55.0 67 -99 SPO 1997 10 30 00 05 98 3.4 -9 665.60 -57.0 -50.9 -54.9 67 -99 SPO 1997 10 30 00 06 97 3.4 -9 665.60 -56.9 -50.8 -54.9 67 -99 SPO 1997 10 30 00 07 96 3.4 -9 665.60 -57.0 -50.8 -54.9 68 -99 SPO 1997 10 30 00 08 97 3.2 -9 665.60 -57.0 -50.8 -54.8 68 -99 SPO 1997 10 30 00 09 98 3.1 -9 665.60 -57.0 -51.0 -54.8 69 -99 SPO 1997 10 30 00 10 100 3.0 -9 665.60 -56.9 -51.2 -54.8 68 -99 SPO 1997 10 30 00 11 100 2.9 -9 665.60 -57.0 -51.4 -54.7 70 -99 SPO 1997 10 30 00 12 98 3.1 -9 665.60 -56.9 -51.4 -54.6 69 -99 SPO 1997 10 30 00 13 95 3.2 -9 665.60 -56.9 -51.2 -54.5 69 -99 SPO 1997 10 30 00 14 93 3.3 -9 665.60 -57.0 -50.9 -54.5 71 -99 SPO 1997 10 30 00 15 92 4.2 -9 665.30 -55.8 -50.1 -54.5 69 -99 SPO 1997 10 30 00 16 -999 -99.9 -9 665.30 -56.9 -50.1 -54.5 78 -99 SPO 1997 10 30 00 17 93 4.2 -9 665.30 -55.8 -50.1 -54.4 69 -99 SPO 1997 10 30 00 18 93 4.2 -9 665.30 -55.8 -50.2 -54.4 69 -99 SPO 1997 10 30 00 19 93 4.4 -9 665.30 -55.7 -50.2 -54.4 67 -99 SPO 1997 10 30 00 20 92 4.4 -9 665.30 -55.6 -50.2 -54.4 66 -99 SPO 1997 10 30 00 21 92 4.4 -9 665.30 -55.6 -50.1 -54.4 66 -99 SPO 1997 10 30 00 22 94 4.3 -9 665.30 -55.6 -50.2 -54.4 67 -99 SPO 1997 10 30 00 23 96 4.2 -9 665.20 -55.6 -50.3 -54.3 68 -99 SPO 1997 10 30 00 24 96 4.2 -9 665.30 -55.6 -50.3 -54.3 69 -99 SPO 1997 10 30 00 25 97 4.2 -9 665.30 -55.6 -50.3 -54.3 69 -99 SPO 1997 10 30 00 26 97 4.1 -9 665.30 -55.6 -50.2 -54.3 69 -99 SPO 1997 10 30 00 27 99 4.0 -9 665.30 -55.6 -50.4 -54.3 69 -99 SPO 1997 10 30 00 28 101 3.9 -9 665.30 -55.6 -50.6 -54.3 70 -99 SPO 1997 10 30 00 29 103 3.8 -9 665.30 -55.6 -51.2 -54.4 69 -99 SPO 1997 10 30 00 30 105 3.6 -9 665.30 -55.7 -51.7 -54.6 70 -99 SPO 1997 10 30 00 31 105 3.6 -9 665.30 -55.8 -52.1 -54.8 70 -99 SPO 1997 10 30 00 32 103 3.5 -9 665.30 -55.8 -52.0 -54.6 70 -99 SPO 1997 10 30 00 33 104 3.5 -9 665.30 -55.8 -51.7 -54.5 70 -99 SPO 1997 10 30 00 34 107 3.3 -9 665.30 -55.8 -52.0 -54.6 69 -99 SPO 1997 10 30 00 35 111 3.3 -9 665.30 -55.8 -52.6 -54.9 69 -99 SPO 1997 10 30 00 36 112 3.2 -9 665.30 -55.9 -53.0 -55.0 69 -99 SPO 1997 10 30 00 37 112 3.3 -9 665.30 -55.9 -53.0 -55.1 69 -99 SPO 1997 10 30 00 38 111 3.3 -9 665.30 -56.0 -53.0 -55.1 70 -99 SPO 1997 10 30 00 39 111 3.2 -9 665.30 -56.0 -52.9 -55.2 69 -99 SPO 1997 10 30 00 40 111 3.2 -9 665.30 -56.1 -52.8 -55.2 69 -99 SPO 1997 10 30 00 41 110 3.3 -9 665.30 -56.2 -52.8 -55.2 70 -99 SPO 1997 10 30 00 42 108 3.3 -9 665.30 -56.3 -52.5 -55.0 70 -99 SPO 1997 10 30 00 43 108 3.3 -9 665.30 -56.3 -52.4 -54.9 69 -99 SPO 1997 10 30 00 44 110 3.2 -9 665.30 -56.4 -52.5 -55.0 70 -99 SPO 1997 10 30 00 45 110 3.2 -9 665.30 -56.4 -52.6 -55.0 69 -99 SPO 1997 10 30 00 46 107 3.3 -9 665.30 -56.3 -52.6 -54.9 68 -99 SPO 1997 10 30 00 47 106 3.4 -9 665.30 -56.4 -52.4 -54.7 68 -99 SPO 1997 10 30 00 48 106 3.4 -9 665.30 -56.4 -52.4 -54.7 68 -99 SPO 1997 10 30 00 49 108 3.4 -9 665.30 -56.4 -52.5 -54.9 68 -99 SPO 1997 10 30 00 50 108 3.4 -9 665.30 -56.4 -52.6 -55.0 67 -99 SPO 1997 10 30 00 51 106 3.4 -9 665.30 -56.4 -52.2 -55.0 67 -99 SPO 1997 10 30 00 52 104 3.5 -9 665.30 -56.5 -51.9 -54.8 69 -99 SPO 1997 10 30 00 53 105 3.6 -9 665.30 -56.4 -51.6 -54.7 68 -99 SPO 1997 10 30 00 54 106 3.6 -9 665.30 -56.4 -51.5 -54.7 68 -99 SPO 1997 10 30 00 55 106 3.7 -9 665.30 -56.4 -51.5 -54.8 69 -99 SPO 1997 10 30 00 56 104 3.8 -9 665.30 -56.4 -51.5 -54.8 69 -99 SPO 1997 10 30 00 57 103 3.8 -9 665.30 -56.3 -51.4 -54.7 68 -99 SPO 1997 10 30 00 58 103 3.8 -9 665.40 -56.2 -51.4 -54.7 68 -99 SPO 1997 10 30 00 59 104 3.8 -9 665.40 -56.2 -51.6 -54.7 69 -99 SPO 1997 10 30 01 00 104 3.9 -9 665.30 -56.2 -51.6 -54.7 69 0 SPO 1997 10 30 01 01 101 3.9 -9 665.30 -56.0 -51.5 -54.6 67 -99 SPO 1997 10 30 01 02 100 4.0 -9 665.30 -55.9 -51.2 -54.4 66 -99 SPO 1997 10 30 01 03 100 3.9 -9 665.30 -55.8 -51.0 -54.4 66 -99 SPO 1997 10 30 01 04 101 3.9 -9 665.30 -55.8 -51.2 -54.3 66 -99 SPO 1997 10 30 01 05 101 3.8 -9 665.30 -55.7 -51.3 -54.3 66 -99 SPO 1997 10 30 01 06 100 3.9 -9 665.30 -55.7 -51.2 -54.3 68 -99 SPO 1997 10 30 01 07 99 3.9 -9 665.30 -55.7 -51.2 -54.2 68 -99 SPO 1997 10 30 01 08 100 3.8 -9 665.30 -55.7 -51.1 -54.2 69 -99 SPO 1997 10 30 01 09 100 3.7 -9 665.30 -55.8 -51.1 -54.2 70 -99 SPO 1997 10 30 01 10 102 3.7 -9 665.30 -55.8 -51.2 -54.2 70 -99 SPO 1997 10 30 01 11 104 3.6 -9 665.30 -55.8 -51.4 -54.3 70 -99 SPO 1997 10 30 01 12 107 3.5 -9 665.30 -55.9 -52.2 -54.6 71 -99 SPO 1997 10 30 01 13 108 3.4 -9 665.30 -56.0 -52.9 -54.8 -99 -99 SPO 1997 10 30 01 14 107 3.5 -9 665.30 -55.9 -53.2 -54.9 -99 -99 SPO 1997 10 30 01 15 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 17 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 18 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 19 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 20 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 21 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 22 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 23 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 24 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 25 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 26 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 27 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 28 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 29 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 30 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 31 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 32 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 33 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 34 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 35 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 36 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 37 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 40 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 41 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 42 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 43 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 44 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 45 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 46 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 47 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 48 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 49 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 50 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 51 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 52 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 53 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 54 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 55 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 56 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 57 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 58 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 01 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 00 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 0 SPO 1997 10 30 02 01 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 02 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 03 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 04 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 05 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 06 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 07 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 08 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 09 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 10 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 11 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 12 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 13 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 14 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 30 02 15 106 3.5 -9 665.30 -56.0 -53.2 -54.9 -99 -99 SPO 1997 10 30 02 16 105 3.6 -9 665.30 -56.1 -53.3 -54.9 -99 -99 SPO 1997 10 30 02 17 102 3.6 -9 665.30 -56.1 -53.3 -54.8 69 -99 SPO 1997 10 30 02 18 100 3.6 -9 665.30 -56.2 -53.2 -54.6 69 -99 SPO 1997 10 30 02 19 102 3.7 -9 665.30 -56.2 -53.1 -54.5 69 -99 SPO 1997 10 30 02 20 105 3.7 -9 665.30 -56.3 -53.1 -54.6 69 -99 SPO 1997 10 30 02 21 104 3.7 -9 665.30 -56.2 -53.0 -54.6 68 -99 SPO 1997 10 30 02 22 102 3.7 -9 665.30 -56.2 -52.5 -54.5 68 -99 SPO 1997 10 30 02 23 102 3.7 -9 665.30 -56.2 -52.3 -54.4 68 -99 SPO 1997 10 30 02 24 101 3.6 -9 665.30 -56.1 -52.3 -54.3 67 -99 SPO 1997 10 30 02 25 100 3.6 -9 665.30 -56.0 -52.0 -54.2 67 -99 SPO 1997 10 30 02 26 99 3.8 -9 665.30 -56.0 -51.7 -54.2 67 -99 SPO 1997 10 30 02 27 99 3.8 -9 665.30 -56.1 -51.6 -54.2 69 -99 SPO 1997 10 30 02 28 99 3.8 -9 665.30 -56.0 -51.5 -54.2 69 -99 SPO 1997 10 30 02 29 100 3.8 -9 665.30 -56.0 -51.4 -54.2 69 -99 SPO 1997 10 30 02 30 102 3.8 -9 665.30 -56.0 -51.6 -54.2 69 -99 SPO 1997 10 30 02 31 104 3.8 -9 665.30 -56.0 -51.7 -54.2 69 -99 SPO 1997 10 30 02 32 104 3.8 -9 665.30 -55.9 -51.8 -54.2 68 -99 SPO 1997 10 30 02 33 103 3.9 -9 665.30 -55.8 -51.6 -54.2 67 -99 SPO 1997 10 30 02 34 103 3.9 -9 665.30 -55.8 -51.6 -54.2 67 -99 SPO 1997 10 30 02 35 102 3.9 -9 665.30 -55.8 -51.6 -54.1 68 -99 SPO 1997 10 30 02 36 101 3.8 -9 665.20 -55.8 -51.7 -54.1 69 -99 SPO 1997 10 30 02 37 101 3.8 -9 665.20 -55.8 -51.8 -54.0 70 -99 SPO 1997 10 30 02 38 100 3.8 -9 665.20 -55.8 -51.7 -54.0 70 -99 SPO 1997 10 30 02 39 99 3.9 -9 665.20 -55.7 -51.6 -54.1 70 -99 SPO 1997 10 30 02 40 97 4.0 -9 665.20 -55.8 -51.4 -54.1 70 -99 SPO 1997 10 30 02 41 96 4.1 -9 665.20 -55.8 -51.1 -54.2 70 -99 SPO 1997 10 30 02 42 95 4.2 -9 665.20 -55.8 -51.0 -54.2 70 -99 SPO 1997 10 30 02 43 94 4.2 -9 665.10 -55.7 -50.8 -54.2 68 -99 SPO 1997 10 30 02 44 95 4.1 -9 665.10 -55.8 -50.8 -54.2 68 -99 SPO 1997 10 30 02 45 95 4.1 -9 665.10 -55.7 -50.8 -54.2 67 -99 SPO 1997 10 30 02 46 95 4.1 -9 665.10 -55.8 -50.7 -54.2 68 -99 SPO 1997 10 30 02 47 95 4.1 -9 665.10 -55.8 -50.7 -54.2 68 -99 SPO 1997 10 30 02 48 95 4.0 -9 665.10 -55.8 -50.8 -54.2 69 -99 SPO 1997 10 30 02 49 96 3.9 -9 665.10 -55.8 -51.1 -54.2 70 -99 SPO 1997 10 30 02 50 97 3.9 -9 665.10 -55.8 -51.5 -54.1 70 -99 SPO 1997 10 30 02 51 99 3.8 -9 665.10 -55.8 -52.1 -54.1 70 -99 SPO 1997 10 30 02 52 100 3.8 -9 665.10 -55.7 -52.6 -54.2 70 -99 SPO 1997 10 30 02 53 99 3.8 -9 665.10 -55.8 -52.6 -54.2 70 -99 SPO 1997 10 30 02 54 99 3.8 -9 665.10 -55.8 -52.3 -54.1 70 -99 SPO 1997 10 30 02 55 99 3.8 -9 665.10 -55.8 -52.3 -54.1 70 -99 SPO 1997 10 30 02 56 99 3.7 -9 665.10 -55.8 -52.4 -54.2 69 -99 SPO 1997 10 30 02 57 99 3.7 -9 665.10 -55.7 -52.3 -54.2 68 -99 SPO 1997 10 30 02 58 99 3.7 -9 665.10 -55.8 -52.5 -54.1 68 -99 SPO 1997 10 30 02 59 99 3.7 -9 665.10 -55.8 -52.8 -54.1 67 -99 SPO 1997 10 30 03 00 98 3.7 -9 665.10 -55.9 -52.9 -54.2 68 0 SPO 1997 10 30 03 01 97 3.7 -9 665.10 -55.9 -52.9 -54.2 68 -99 SPO 1997 10 30 03 02 95 3.8 -9 665.00 -56.0 -52.6 -54.2 69 -99 SPO 1997 10 30 03 03 92 3.9 -9 665.00 -56.0 -52.1 -54.2 69 -99 SPO 1997 10 30 03 04 92 4.0 -9 665.00 -56.0 -51.8 -54.2 69 -99 SPO 1997 10 30 03 05 91 4.0 -9 665.00 -56.0 -51.5 -54.2 69 -99 SPO 1997 10 30 03 06 91 4.0 -9 665.00 -55.9 -51.4 -54.2 68 -99 SPO 1997 10 30 03 07 90 4.0 -9 665.00 -55.9 -51.2 -54.2 68 -99 SPO 1997 10 30 03 08 90 4.0 -9 665.00 -55.9 -51.1 -54.2 68 -99 SPO 1997 10 30 03 09 89 4.0 -9 665.00 -55.8 -51.0 -54.2 67 -99 SPO 1997 10 30 03 10 90 4.0 -9 665.00 -55.7 -50.9 -54.2 66 -99 SPO 1997 10 30 03 11 92 3.9 -9 665.00 -55.7 -50.9 -54.2 66 -99 SPO 1997 10 30 03 12 93 3.7 -9 665.00 -55.7 -51.2 -54.1 66 -99 SPO 1997 10 30 03 13 94 3.6 -9 665.00 -55.7 -51.6 -54.0 66 -99 SPO 1997 10 30 03 14 94 3.6 -9 665.00 -55.7 -51.9 -53.9 67 -99 SPO 1997 10 30 03 15 93 3.7 -9 665.00 -55.7 -51.8 -53.9 67 -99 SPO 1997 10 30 03 16 91 3.8 -9 665.00 -55.7 -51.6 -53.9 68 -99 SPO 1997 10 30 03 17 90 3.8 -9 665.00 -55.7 -51.4 -54.0 68 -99 SPO 1997 10 30 03 18 89 3.8 -9 665.00 -55.7 -51.5 -54.0 68 -99 SPO 1997 10 30 03 19 89 3.7 -9 665.00 -55.7 -51.6 -54.0 68 -99 SPO 1997 10 30 03 20 89 3.6 -9 665.00 -55.8 -51.6 -54.0 69 -99 SPO 1997 10 30 03 21 88 3.6 -9 665.00 -55.8 -51.7 -54.0 68 -99 SPO 1997 10 30 03 22 88 3.7 -9 665.00 -55.8 -51.6 -54.0 68 -99 SPO 1997 10 30 03 23 88 3.6 -9 665.00 -55.8 -51.8 -54.0 68 -99 SPO 1997 10 30 03 24 90 3.5 -9 665.00 -55.8 -52.2 -54.0 68 -99 SPO 1997 10 30 03 25 92 3.4 -9 665.00 -55.8 -52.6 -53.8 67 -99 SPO 1997 10 30 03 26 92 3.3 -9 665.00 -55.8 -52.8 -53.8 67 -99 SPO 1997 10 30 03 27 89 3.3 -9 665.00 -55.8 -52.8 -53.9 68 -99 SPO 1997 10 30 03 28 86 3.2 -9 665.00 -55.8 -52.7 -54.2 68 -99 SPO 1997 10 30 03 29 84 3.2 -9 665.00 -55.8 -52.7 -54.5 68 -99 SPO 1997 10 30 03 30 83 3.0 -9 665.00 -55.9 -52.8 -54.7 69 -99 SPO 1997 10 30 03 31 82 2.8 -9 665.00 -56.0 -53.0 -54.6 70 -99 SPO 1997 10 30 03 32 83 2.7 -9 665.00 -56.0 -53.2 -54.6 70 -99 SPO 1997 10 30 03 33 84 2.6 -9 665.00 -56.0 -53.4 -54.5 71 -99 SPO 1997 10 30 03 34 86 2.8 -9 664.90 -55.8 -53.3 -54.5 70 -99 SPO 1997 10 30 03 35 87 2.9 -9 664.90 -55.8 -53.1 -54.4 70 -99 SPO 1997 10 30 03 36 87 3.0 -9 664.90 -55.8 -52.8 -54.3 70 -99 SPO 1997 10 30 03 37 86 3.0 -9 664.90 -55.8 -52.6 -54.4 70 -99 SPO 1997 10 30 03 38 85 3.0 -9 664.90 -55.9 -52.4 -54.5 70 -99 SPO 1997 10 30 03 39 85 2.9 -9 664.90 -55.9 -52.6 -54.6 69 -99 SPO 1997 10 30 03 40 87 2.9 -9 664.90 -56.0 -52.9 -54.6 70 -99 SPO 1997 10 30 03 41 88 2.9 -9 664.90 -56.0 -53.0 -54.4 70 -99 SPO 1997 10 30 03 42 87 3.0 -9 664.90 -56.1 -52.9 -54.3 71 -99 SPO 1997 10 30 03 43 87 3.0 -9 664.90 -56.1 -52.7 -54.3 71 -99 SPO 1997 10 30 03 44 89 2.9 -9 664.90 -56.0 -52.3 -54.1 70 -99 SPO 1997 10 30 03 45 91 2.9 -9 664.90 -56.0 -52.4 -53.6 69 -99 SPO 1997 10 30 03 46 95 2.8 -9 664.90 -56.1 -52.6 -53.4 69 -99 SPO 1997 10 30 03 47 97 2.8 -9 664.90 -56.1 -52.6 -53.2 69 -99 SPO 1997 10 30 03 48 99 2.9 -9 664.90 -56.1 -52.6 -53.2 69 -99 SPO 1997 10 30 03 49 99 2.9 -9 664.90 -56.1 -52.5 -53.3 69 -99 SPO 1997 10 30 03 50 100 2.9 -9 664.90 -56.2 -52.2 -53.4 70 -99 SPO 1997 10 30 03 51 99 3.1 -9 664.90 -56.2 -52.0 -53.6 69 -99 SPO 1997 10 30 03 52 97 3.2 -9 664.90 -56.3 -52.0 -53.6 69 -99 SPO 1997 10 30 03 53 95 3.3 -9 664.80 -56.3 -51.8 -53.8 69 -99 SPO 1997 10 30 03 54 94 3.4 -9 664.80 -56.3 -51.7 -53.9 68 -99 SPO 1997 10 30 03 55 95 3.4 -9 664.80 -56.4 -51.7 -54.0 68 -99 SPO 1997 10 30 03 56 96 3.5 -9 664.80 -56.4 -51.7 -54.0 67 -99 SPO 1997 10 30 03 57 95 3.5 -9 664.80 -56.3 -51.7 -54.1 66 -99 SPO 1997 10 30 03 58 94 3.5 -9 664.80 -56.4 -51.8 -54.2 67 -99 SPO 1997 10 30 03 59 93 3.6 -9 664.80 -56.4 -51.8 -54.3 68 -99 SPO 1997 10 30 04 00 91 3.6 -9 664.80 -56.4 -51.8 -54.4 68 0 SPO 1997 10 30 04 01 89 3.6 -9 664.80 -56.3 -51.8 -54.4 67 -99 SPO 1997 10 30 04 02 88 3.6 -9 664.70 -56.4 -51.7 -54.5 68 -99 SPO 1997 10 30 04 03 87 3.6 -9 664.70 -56.4 -51.7 -54.6 68 -99 SPO 1997 10 30 04 04 87 3.6 -9 664.70 -56.4 -51.8 -54.7 69 -99 SPO 1997 10 30 04 05 88 3.5 -9 664.70 -56.3 -51.8 -54.6 68 -99 SPO 1997 10 30 04 06 88 3.4 -9 664.70 -56.3 -51.9 -54.6 68 -99 SPO 1997 10 30 04 07 88 3.4 -9 664.80 -56.3 -51.9 -54.5 68 -99 SPO 1997 10 30 04 08 89 3.3 -9 664.80 -56.3 -51.9 -54.4 67 -99 SPO 1997 10 30 04 09 89 3.3 -9 664.80 -56.3 -51.9 -54.3 67 -99 SPO 1997 10 30 04 10 88 3.3 -9 664.80 -56.3 -51.9 -54.3 67 -99 SPO 1997 10 30 04 11 89 3.4 -9 664.80 -56.3 -51.9 -54.4 66 -99 SPO 1997 10 30 04 12 89 3.4 -9 664.80 -56.3 -52.0 -54.4 66 -99 SPO 1997 10 30 04 13 90 3.5 -9 664.80 -56.3 -52.1 -54.4 67 -99 SPO 1997 10 30 04 14 91 3.4 -9 664.80 -56.3 -52.3 -54.4 67 -99 SPO 1997 10 30 04 15 92 3.3 -9 664.80 -56.3 -52.5 -54.3 67 -99 SPO 1997 10 30 04 16 93 3.3 -9 664.80 -56.3 -52.7 -54.3 67 -99 SPO 1997 10 30 04 17 94 3.2 -9 664.80 -56.4 -52.9 -54.3 68 -99 SPO 1997 10 30 04 18 94 3.2 -9 664.80 -56.3 -53.0 -54.3 67 -99 SPO 1997 10 30 04 19 93 3.2 -9 664.80 -56.3 -53.0 -54.3 68 -99 SPO 1997 10 30 04 20 92 3.3 -9 664.80 -56.3 -53.0 -54.3 68 -99 SPO 1997 10 30 04 21 90 3.4 -9 664.80 -56.3 -52.8 -54.3 68 -99 SPO 1997 10 30 04 22 88 3.5 -9 664.70 -56.3 -52.4 -54.4 69 -99 SPO 1997 10 30 04 23 87 3.5 -9 664.70 -56.3 -52.1 -54.5 69 -99 SPO 1997 10 30 04 24 88 3.5 -9 664.80 -56.3 -52.0 -54.4 68 -99 SPO 1997 10 30 04 25 91 3.4 -9 664.80 -56.4 -52.0 -54.4 69 -99 SPO 1997 10 30 04 26 94 3.5 -9 664.80 -56.4 -52.2 -54.4 68 -99 SPO 1997 10 30 04 27 96 3.4 -9 664.80 -56.4 -52.6 -54.6 67 -99 SPO 1997 10 30 04 28 96 3.4 -9 664.80 -56.4 -52.9 -54.7 66 -99 SPO 1997 10 30 04 29 96 3.4 -9 664.80 -56.4 -53.0 -54.7 66 -99 SPO 1997 10 30 04 30 97 3.3 -9 664.80 -56.4 -53.0 -54.7 66 -99 SPO 1997 10 30 04 31 97 3.2 -9 664.80 -56.4 -53.0 -54.7 66 -99 SPO 1997 10 30 04 32 97 3.2 -9 664.80 -56.4 -52.8 -54.6 67 -99 SPO 1997 10 30 04 33 98 3.2 -9 664.80 -56.3 -52.4 -54.6 66 -99 SPO 1997 10 30 04 34 97 3.2 -9 664.80 -56.3 -52.2 -54.6 67 -99 SPO 1997 10 30 04 35 97 3.2 -9 664.80 -56.3 -52.2 -54.5 67 -99 SPO 1997 10 30 04 36 97 3.2 -9 664.80 -56.4 -52.2 -54.5 68 -99 SPO 1997 10 30 04 37 96 3.2 -9 664.80 -56.3 -52.3 -54.6 68 -99 SPO 1997 10 30 04 38 95 3.2 -9 664.80 -56.4 -52.3 -54.5 69 -99 SPO 1997 10 30 04 39 94 3.2 -9 664.80 -56.4 -52.3 -54.5 69 -99 SPO 1997 10 30 04 40 93 3.3 -9 664.80 -56.4 -52.2 -54.5 67 -99 SPO 1997 10 30 04 41 92 3.3 -9 664.80 -56.4 -52.1 -54.6 67 -99 SPO 1997 10 30 04 42 90 3.4 -9 664.80 -56.4 -52.1 -54.6 67 -99 SPO 1997 10 30 04 43 88 3.5 -9 664.70 -56.4 -51.9 -54.5 67 -99 SPO 1997 10 30 04 44 88 3.5 -9 664.70 -56.4 -51.7 -54.5 68 -99 SPO 1997 10 30 04 45 88 3.4 -9 664.70 -56.4 -51.6 -54.6 68 -99 SPO 1997 10 30 04 46 90 3.4 -9 664.70 -56.4 -51.5 -54.7 68 -99 SPO 1997 10 30 04 47 92 3.3 -9 664.70 -56.4 -51.5 -54.6 68 -99 SPO 1997 10 30 04 48 95 3.2 -9 664.70 -56.4 -51.6 -54.6 68 -99 SPO 1997 10 30 04 49 97 3.1 -9 664.70 -56.3 -51.8 -54.4 67 -99 SPO 1997 10 30 04 50 101 3.0 -9 664.70 -56.3 -52.0 -54.4 67 -99 SPO 1997 10 30 04 51 104 2.9 -9 664.70 -56.3 -52.0 -54.5 67 -99 SPO 1997 10 30 04 52 109 2.7 -9 664.80 -56.3 -52.2 -54.8 67 -99 SPO 1997 10 30 04 53 114 2.5 -9 664.80 -56.4 -52.3 -55.1 68 -99 SPO 1997 10 30 04 54 117 2.5 -9 664.80 -56.3 -52.4 -55.2 67 -99 SPO 1997 10 30 04 55 118 2.4 -9 664.80 -56.1 -52.4 -55.0 65 -99 SPO 1997 10 30 04 56 116 2.3 -9 664.80 -55.9 -52.5 -54.9 65 -99 SPO 1997 10 30 04 57 119 2.1 -9 664.80 -55.8 -52.4 -54.8 64 -99 SPO 1997 10 30 04 58 121 2.1 -9 664.80 -55.7 -52.6 -54.7 64 -99 SPO 1997 10 30 04 59 123 2.1 -9 664.80 -55.6 -52.6 -54.6 64 -99 SPO 1997 10 30 05 00 122 2.2 -9 664.80 -55.7 -52.6 -54.6 65 0 SPO 1997 10 30 05 01 117 2.2 -9 664.80 -55.8 -52.4 -54.6 67 -99 SPO 1997 10 30 05 02 115 2.2 -9 664.80 -55.9 -52.4 -54.5 68 -99 SPO 1997 10 30 05 03 120 2.0 -9 664.80 -55.8 -52.4 -54.4 67 -99 SPO 1997 10 30 05 04 131 1.7 -9 664.80 -55.6 -52.4 -54.2 66 -99 SPO 1997 10 30 05 05 136 1.5 -9 664.80 -55.6 -52.6 -53.8 66 -99 SPO 1997 10 30 05 06 133 1.6 -9 664.80 -55.7 -52.6 -53.6 67 -99 SPO 1997 10 30 05 07 123 1.8 -9 664.80 -55.8 -52.5 -53.5 68 -99 SPO 1997 10 30 05 08 113 1.9 -9 664.80 -55.6 -52.5 -53.4 67 -99 SPO 1997 10 30 05 09 107 1.9 -9 664.80 -55.6 -52.3 -53.1 69 -99 SPO 1997 10 30 05 10 103 1.9 -9 664.80 -55.9 -52.3 -52.6 72 -99 SPO 1997 10 30 05 11 101 1.9 -9 664.80 -56.0 -52.2 -52.4 73 -99 SPO 1997 10 30 05 12 105 1.9 -9 664.80 -56.2 -52.3 -52.2 74 -99 SPO 1997 10 30 05 13 112 2.0 -9 664.80 -56.1 -52.6 -52.6 73 -99 SPO 1997 10 30 05 14 115 2.0 -9 664.80 -56.0 -52.8 -53.3 72 -99 SPO 1997 10 30 05 15 110 2.2 -9 664.80 -56.0 -52.7 -53.3 71 -99 SPO 1997 10 30 05 16 102 2.2 -9 664.80 -56.0 -52.5 -52.9 70 -99 SPO 1997 10 30 05 17 97 2.3 -9 664.80 -56.1 -52.3 -52.6 70 -99 SPO 1997 10 30 05 18 95 2.4 -9 664.80 -56.1 -52.2 -52.5 70 -99 SPO 1997 10 30 05 19 94 2.4 -9 664.80 -56.1 -52.1 -52.6 70 -99 SPO 1997 10 30 05 20 94 2.4 -9 664.80 -56.0 -52.1 -52.8 69 -99 SPO 1997 10 30 05 21 95 2.4 -9 664.80 -56.0 -52.1 -52.8 69 -99 SPO 1997 10 30 05 22 95 2.5 -9 664.80 -56.0 -52.1 -52.8 69 -99 SPO 1997 10 30 05 23 92 2.5 -9 664.80 -56.1 -52.1 -52.9 69 -99 SPO 1997 10 30 05 24 89 2.4 -9 664.80 -56.0 -52.1 -53.2 69 -99 SPO 1997 10 30 05 25 87 2.5 -9 664.80 -56.0 -52.1 -53.6 68 -99 SPO 1997 10 30 05 26 87 2.5 -9 664.80 -56.0 -52.1 -53.8 68 -99 SPO 1997 10 30 05 27 87 2.6 -9 664.80 -56.1 -52.2 -53.8 69 -99 SPO 1997 10 30 05 28 89 2.7 -9 664.80 -56.1 -52.2 -53.6 69 -99 SPO 1997 10 30 05 29 89 2.7 -9 664.80 -56.1 -52.2 -53.5 69 -99 SPO 1997 10 30 05 30 88 2.7 -9 664.80 -56.2 -52.3 -53.6 69 -99 SPO 1997 10 30 05 31 90 2.7 -9 664.80 -56.3 -52.3 -53.6 69 -99 SPO 1997 10 30 05 32 90 2.6 -9 664.80 -56.4 -52.3 -53.5 69 -99 SPO 1997 10 30 05 33 92 2.6 -9 664.80 -56.4 -52.4 -53.5 69 -99 SPO 1997 10 30 05 34 93 2.6 -9 664.80 -56.3 -52.4 -53.5 68 -99 SPO 1997 10 30 05 35 95 2.6 -9 664.80 -56.2 -52.4 -53.5 67 -99 SPO 1997 10 30 05 36 96 2.6 -9 664.80 -56.1 -52.4 -53.5 65 -99 SPO 1997 10 30 05 37 96 2.6 -9 664.80 -56.2 -52.4 -53.5 66 -99 SPO 1997 10 30 05 38 98 2.5 -9 664.80 -56.2 -52.5 -53.4 65 -99 SPO 1997 10 30 05 39 101 2.5 -9 664.80 -56.2 -52.6 -53.4 65 -99 SPO 1997 10 30 05 40 105 2.5 -9 664.80 -56.3 -52.7 -53.8 67 -99 SPO 1997 10 30 05 41 105 2.6 -9 664.80 -56.2 -52.8 -54.0 67 -99 SPO 1997 10 30 05 42 107 2.6 -9 664.80 -56.2 -52.8 -54.2 67 -99 SPO 1997 10 30 05 43 109 2.6 -9 664.80 -56.2 -52.8 -54.6 67 -99 SPO 1997 10 30 05 44 112 2.5 -9 664.90 -56.2 -52.9 -54.8 67 -99 SPO 1997 10 30 05 45 112 2.5 -9 664.90 -56.0 -52.9 -54.9 65 -99 SPO 1997 10 30 05 46 117 2.4 -9 664.90 -55.9 -52.9 -54.8 65 -99 SPO 1997 10 30 05 47 121 2.5 -9 664.90 -55.6 -53.0 -54.6 64 -99 SPO 1997 10 30 05 48 113 2.5 -9 664.80 -55.6 -53.0 -54.5 64 -99 SPO 1997 10 30 05 49 104 2.8 -9 664.80 -56.1 -53.0 -55.0 69 -99 SPO 1997 10 30 05 50 104 2.8 -9 664.80 -56.5 -52.8 -55.1 71 -99 SPO 1997 10 30 05 51 107 2.9 -9 664.80 -56.6 -52.8 -55.2 70 -99 SPO 1997 10 30 05 52 108 2.9 -9 664.80 -56.7 -52.8 -55.3 69 -99 SPO 1997 10 30 05 53 106 2.9 -9 664.80 -56.7 -52.8 -55.3 68 -99 SPO 1997 10 30 05 54 104 3.0 -9 664.80 -56.6 -52.7 -55.2 67 -99 SPO 1997 10 30 05 55 106 2.9 -9 664.80 -56.6 -52.7 -55.1 67 -99 SPO 1997 10 30 05 56 111 3.0 -9 664.80 -56.5 -52.8 -55.2 65 -99 SPO 1997 10 30 05 57 110 3.1 -9 664.80 -56.6 -52.8 -55.3 66 -99 SPO 1997 10 30 05 58 106 3.2 -9 664.80 -56.6 -52.7 -55.2 66 -99 SPO 1997 10 30 05 59 107 3.1 -9 664.80 -56.6 -52.8 -55.0 66 -99 SPO 1997 10 30 06 00 108 3.0 -9 664.80 -56.6 -52.8 -55.0 66 0 SPO 1997 10 30 06 01 106 3.0 -9 664.80 -56.5 -52.8 -54.8 65 -99 SPO 1997 10 30 06 02 106 2.9 -9 664.80 -56.4 -52.7 -54.5 65 -99 SPO 1997 10 30 06 03 108 2.8 -9 664.80 -56.4 -52.6 -54.5 65 -99 SPO 1997 10 30 06 04 109 2.7 -9 664.80 -56.3 -52.7 -54.5 65 -99 SPO 1997 10 30 06 05 110 2.7 -9 664.80 -56.3 -52.7 -54.4 66 -99 SPO 1997 10 30 06 06 112 2.7 -9 664.80 -56.3 -52.8 -54.6 66 -99 SPO 1997 10 30 06 07 109 2.9 -9 664.70 -56.3 -52.8 -54.6 66 -99 SPO 1997 10 30 06 08 106 3.1 -9 664.70 -56.3 -52.9 -54.4 67 -99 SPO 1997 10 30 06 09 108 3.1 -9 664.70 -56.3 -52.8 -54.2 66 -99 SPO 1997 10 30 06 10 114 3.0 -9 664.80 -56.3 -52.9 -54.4 66 -99 SPO 1997 10 30 06 11 118 3.0 -9 664.80 -56.4 -53.1 -54.8 67 -99 SPO 1997 10 30 06 12 112 3.3 -9 664.80 -56.3 -53.1 -54.9 66 -99 SPO 1997 10 30 06 13 112 3.2 -9 664.80 -56.4 -53.1 -54.8 68 -99 SPO 1997 10 30 06 14 118 3.1 -9 664.80 -56.4 -53.1 -54.9 68 -99 SPO 1997 10 30 06 15 111 3.2 -9 664.70 -56.3 -53.1 -55.0 67 -99 SPO 1997 10 30 06 16 105 3.4 -9 664.70 -56.4 -52.9 -54.7 69 -99 SPO 1997 10 30 06 17 101 3.4 -9 664.70 -56.3 -52.8 -54.2 68 -99 SPO 1997 10 30 06 18 102 3.4 -9 664.70 -56.3 -52.8 -54.0 68 -99 SPO 1997 10 30 06 19 104 3.4 -9 664.70 -56.3 -53.0 -53.9 68 -99 SPO 1997 10 30 06 20 101 3.5 -9 664.60 -56.2 -52.8 -53.9 67 -99 SPO 1997 10 30 06 21 100 3.6 -9 664.60 -56.2 -52.5 -53.9 67 -99 SPO 1997 10 30 06 22 101 3.6 -9 664.60 -56.2 -52.3 -53.9 67 -99 SPO 1997 10 30 06 23 102 3.7 -9 664.60 -56.2 -52.1 -54.0 67 -99 SPO 1997 10 30 06 24 101 3.8 -9 664.60 -56.2 -52.0 -54.0 67 -99 SPO 1997 10 30 06 25 99 3.9 -9 664.60 -56.2 -51.9 -54.0 67 -99 SPO 1997 10 30 06 26 98 4.0 -9 664.60 -56.2 -51.8 -54.1 66 -99 SPO 1997 10 30 06 27 98 3.9 -9 664.60 -56.1 -51.8 -54.0 65 -99 SPO 1997 10 30 06 28 98 3.9 -9 664.60 -56.1 -51.8 -54.1 65 -99 SPO 1997 10 30 06 29 99 4.0 -9 664.60 -56.1 -51.8 -54.1 66 -99 SPO 1997 10 30 06 30 99 4.0 -9 664.60 -56.1 -51.8 -54.1 66 -99 SPO 1997 10 30 06 31 99 4.0 -9 664.60 -56.1 -51.9 -54.1 66 -99 SPO 1997 10 30 06 32 99 3.9 -9 664.60 -56.1 -51.9 -54.1 66 -99 SPO 1997 10 30 06 33 99 3.9 -9 664.60 -56.1 -51.9 -54.1 66 -99 SPO 1997 10 30 06 34 99 3.9 -9 664.60 -56.1 -51.8 -54.1 66 -99 SPO 1997 10 30 06 35 96 3.9 -9 664.60 -56.0 -51.7 -54.1 65 -99 SPO 1997 10 30 06 36 95 3.8 -9 664.60 -56.0 -51.7 -54.1 66 -99 SPO 1997 10 30 06 37 96 3.8 -9 664.60 -56.0 -51.8 -54.1 66 -99 SPO 1997 10 30 06 38 97 3.8 -9 664.60 -56.0 -51.8 -54.1 66 -99 SPO 1997 10 30 06 39 99 3.8 -9 664.60 -56.0 -51.9 -54.0 66 -99 SPO 1997 10 30 06 40 102 3.9 -9 664.60 -56.0 -52.0 -54.1 65 -99 SPO 1997 10 30 06 41 103 3.9 -9 664.60 -56.0 -52.2 -54.2 65 -99 SPO 1997 10 30 06 42 101 3.9 -9 664.60 -56.0 -52.0 -54.1 65 -99 SPO 1997 10 30 06 43 99 4.0 -9 664.60 -56.0 -51.8 -54.2 65 -99 SPO 1997 10 30 06 44 98 4.0 -9 664.60 -56.0 -51.7 -54.2 65 -99 SPO 1997 10 30 06 45 98 4.1 -9 664.60 -56.0 -51.7 -54.2 65 -99 SPO 1997 10 30 06 46 97 4.2 -9 664.60 -55.9 -51.6 -54.2 65 -99 SPO 1997 10 30 06 47 94 4.3 -9 664.50 -55.9 -51.6 -54.3 65 -99 SPO 1997 10 30 06 48 92 4.2 -9 664.50 -55.8 -51.6 -54.4 65 -99 SPO 1997 10 30 06 49 91 4.2 -9 664.50 -55.8 -51.5 -54.6 65 -99 SPO 1997 10 30 06 50 91 4.1 -9 664.50 -55.8 -51.6 -54.6 65 -99 SPO 1997 10 30 06 51 91 4.0 -9 664.50 -55.8 -51.5 -54.6 66 -99 SPO 1997 10 30 06 52 91 4.0 -9 664.50 -55.8 -51.5 -54.5 67 -99 SPO 1997 10 30 06 53 92 3.9 -9 664.50 -55.8 -51.5 -54.5 67 -99 SPO 1997 10 30 06 54 93 3.8 -9 664.50 -55.8 -51.5 -54.4 68 -99 SPO 1997 10 30 06 55 94 3.8 -9 664.50 -55.8 -51.6 -54.3 67 -99 SPO 1997 10 30 06 56 94 3.8 -9 664.50 -55.7 -51.6 -54.3 65 -99 SPO 1997 10 30 06 57 96 3.7 -9 664.50 -55.8 -51.7 -54.2 66 -99 SPO 1997 10 30 06 58 98 3.7 -9 664.50 -55.8 -51.8 -54.1 66 -99 SPO 1997 10 30 06 59 100 3.6 -9 664.50 -55.8 -52.2 -54.0 66 -99 SPO 1997 10 30 07 00 103 3.6 -9 664.50 -55.8 -52.6 -53.9 66 0 SPO 1997 10 30 07 01 104 3.6 -9 664.50 -55.9 -52.8 -53.9 67 -99 SPO 1997 10 30 07 02 104 3.5 -9 664.50 -55.9 -53.0 -53.9 67 -99 SPO 1997 10 30 07 03 104 3.4 -9 664.50 -55.9 -53.0 -53.8 67 -99 SPO 1997 10 30 07 04 104 3.3 -9 664.60 -56.0 -53.1 -53.8 67 -99 SPO 1997 10 30 07 05 105 3.1 -9 664.60 -56.0 -53.2 -53.7 66 -99 SPO 1997 10 30 07 06 107 2.9 -9 664.60 -56.0 -53.4 -53.7 67 -99 SPO 1997 10 30 07 07 107 3.0 -9 664.60 -56.0 -53.5 -53.8 67 -99 SPO 1997 10 30 07 08 104 2.9 -9 664.60 -56.0 -53.4 -53.8 67 -99 SPO 1997 10 30 07 09 101 2.9 -9 664.60 -56.1 -53.4 -53.5 67 -99 SPO 1997 10 30 07 10 98 3.0 -9 664.60 -56.2 -53.3 -53.4 69 -99 SPO 1997 10 30 07 11 97 3.1 -9 664.60 -56.2 -53.3 -53.3 68 -99 SPO 1997 10 30 07 12 95 3.1 -9 664.60 -56.2 -53.2 -53.3 68 -99 SPO 1997 10 30 07 13 94 3.1 -9 664.60 -56.2 -53.3 -53.3 68 -99 SPO 1997 10 30 07 14 93 3.1 -9 664.60 -56.2 -53.4 -53.3 68 -99 SPO 1997 10 30 07 15 93 3.1 -9 664.60 -56.2 -53.4 -53.3 68 -99 SPO 1997 10 30 07 16 94 3.1 -9 664.60 -56.3 -53.5 -53.2 69 -99 SPO 1997 10 30 07 17 94 3.1 -9 664.60 -56.3 -53.6 -53.1 69 -99 SPO 1997 10 30 07 18 94 3.1 -9 664.60 -56.3 -53.6 -53.0 69 -99 SPO 1997 10 30 07 19 93 3.1 -9 664.60 -56.3 -53.6 -53.0 69 -99 SPO 1997 10 30 07 20 92 3.0 -9 664.60 -56.3 -53.7 -52.9 69 -99 SPO 1997 10 30 07 21 91 3.1 -9 664.60 -56.3 -53.6 -52.9 69 -99 SPO 1997 10 30 07 22 90 3.1 -9 664.60 -56.3 -53.6 -52.9 69 -99 SPO 1997 10 30 07 23 90 3.1 -9 664.60 -56.3 -53.5 -52.9 69 -99 SPO 1997 10 30 07 24 89 3.3 -9 664.60 -56.2 -53.5 -52.9 67 -99 SPO 1997 10 30 07 25 87 3.4 -9 664.60 -56.2 -53.4 -53.3 67 -99 SPO 1997 10 30 07 26 85 3.4 -9 664.60 -56.2 -53.3 -53.9 67 -99 SPO 1997 10 30 07 27 84 3.6 -9 664.50 -56.2 -53.1 -54.2 68 -99 SPO 1997 10 30 07 28 82 3.6 -9 664.50 -56.1 -52.9 -54.4 67 -99 SPO 1997 10 30 07 29 79 3.8 -9 664.50 -56.1 -52.8 -54.7 66 -99 SPO 1997 10 30 07 30 78 3.8 -9 664.50 -56.2 -52.8 -54.8 67 -99 SPO 1997 10 30 07 31 77 3.9 -9 664.50 -56.1 -52.6 -54.8 66 -99 SPO 1997 10 30 07 32 77 3.8 -9 664.50 -56.0 -52.5 -54.8 65 -99 SPO 1997 10 30 07 33 75 3.8 -9 664.50 -56.0 -52.5 -54.8 66 -99 SPO 1997 10 30 07 34 75 3.9 -9 664.50 -56.0 -52.5 -54.8 67 -99 SPO 1997 10 30 07 35 75 3.9 -9 664.50 -55.8 -52.6 -54.8 65 -99 SPO 1997 10 30 07 36 75 3.9 -9 664.50 -55.9 -52.7 -54.8 67 -99 SPO 1997 10 30 07 37 77 3.9 -9 664.50 -55.8 -52.8 -54.8 67 -99 SPO 1997 10 30 07 38 79 3.8 -9 664.50 -55.8 -52.9 -54.7 67 -99 SPO 1997 10 30 07 39 80 3.6 -9 664.50 -55.9 -53.0 -54.6 68 -99 SPO 1997 10 30 07 40 81 3.6 -9 664.50 -55.9 -53.2 -54.3 68 -99 SPO 1997 10 30 07 41 81 3.6 -9 664.50 -55.9 -53.2 -54.2 67 -99 SPO 1997 10 30 07 42 81 3.5 -9 664.50 -55.9 -53.2 -54.2 67 -99 SPO 1997 10 30 07 43 81 3.5 -9 664.50 -55.9 -53.2 -54.0 67 -99 SPO 1997 10 30 07 44 80 3.5 -9 664.50 -55.9 -53.2 -54.0 68 -99 SPO 1997 10 30 07 45 78 3.5 -9 664.50 -55.9 -53.2 -54.2 67 -99 SPO 1997 10 30 07 46 78 3.5 -9 664.50 -55.8 -53.2 -54.2 66 -99 SPO 1997 10 30 07 47 77 3.5 -9 664.50 -55.8 -53.3 -54.2 65 -99 SPO 1997 10 30 07 48 77 3.5 -9 664.50 -55.8 -53.3 -54.2 65 -99 SPO 1997 10 30 07 49 77 3.5 -9 664.50 -55.9 -53.3 -54.2 66 -99 SPO 1997 10 30 07 50 79 3.4 -9 664.50 -55.9 -53.3 -53.9 67 -99 SPO 1997 10 30 07 51 80 3.5 -9 664.50 -55.9 -53.4 -53.6 67 -99 SPO 1997 10 30 07 52 80 3.6 -9 664.40 -55.9 -53.4 -53.6 67 -99 SPO 1997 10 30 07 53 80 3.7 -9 664.40 -55.9 -53.4 -53.7 67 -99 SPO 1997 10 30 07 54 79 3.7 -9 664.40 -55.9 -53.3 -53.8 67 -99 SPO 1997 10 30 07 55 79 3.5 -9 664.40 -55.9 -53.4 -53.8 67 -99 SPO 1997 10 30 07 56 78 3.5 -9 664.40 -55.8 -53.4 -53.8 66 -99 SPO 1997 10 30 07 57 77 3.5 -9 664.40 -55.8 -53.4 -53.9 66 -99 SPO 1997 10 30 07 58 75 3.5 -9 664.40 -55.9 -53.3 -54.1 67 -99 SPO 1997 10 30 07 59 74 3.5 -9 664.40 -55.9 -53.2 -54.4 67 -99 SPO 1997 10 30 08 00 75 3.5 -9 664.40 -55.9 -53.2 -54.4 67 0 SPO 1997 10 30 08 01 75 3.5 -9 664.40 -55.9 -53.2 -54.4 67 -99 SPO 1997 10 30 08 02 74 3.6 -9 664.40 -56.0 -53.0 -54.4 67 -99 SPO 1997 10 30 08 03 74 3.6 -9 664.30 -56.0 -53.0 -54.6 67 -99 SPO 1997 10 30 08 04 74 3.6 -9 664.30 -56.0 -53.0 -54.6 67 -99 SPO 1997 10 30 08 05 75 3.6 -9 664.30 -56.1 -53.1 -54.6 67 -99 SPO 1997 10 30 08 06 75 3.5 -9 664.40 -56.1 -53.1 -54.6 67 -99 SPO 1997 10 30 08 07 75 3.5 -9 664.30 -56.1 -53.1 -54.5 67 -99 SPO 1997 10 30 08 08 74 3.4 -9 664.30 -56.1 -53.1 -54.6 67 -99 SPO 1997 10 30 08 09 73 3.4 -9 664.30 -56.0 -53.1 -54.7 67 -99 SPO 1997 10 30 08 10 73 3.5 -9 664.30 -56.1 -53.0 -54.8 68 -99 SPO 1997 10 30 08 11 72 3.5 -9 664.30 -56.1 -52.8 -54.9 68 -99 SPO 1997 10 30 08 12 72 3.5 -9 664.30 -56.1 -52.7 -54.9 68 -99 SPO 1997 10 30 08 13 73 3.5 -9 664.30 -56.2 -52.6 -54.9 69 -99 SPO 1997 10 30 08 14 73 3.3 -9 664.40 -56.2 -52.7 -54.9 69 -99 SPO 1997 10 30 08 15 75 3.1 -9 664.40 -56.1 -52.8 -54.8 67 -99 SPO 1997 10 30 08 16 77 3.0 -9 664.40 -56.1 -52.9 -54.6 67 -99 SPO 1997 10 30 08 17 78 3.0 -9 664.40 -56.1 -53.0 -54.2 66 -99 SPO 1997 10 30 08 18 78 3.0 -9 664.40 -56.2 -53.0 -53.8 65 -99 SPO 1997 10 30 08 19 77 3.0 -9 664.40 -56.1 -53.0 -53.9 64 -99 SPO 1997 10 30 08 20 78 3.1 -9 664.40 -56.1 -53.0 -54.1 66 -99 SPO 1997 10 30 08 21 79 3.1 -9 664.40 -56.1 -52.9 -54.2 67 -99 SPO 1997 10 30 08 22 82 2.9 -9 664.40 -56.1 -52.9 -53.8 68 -99 SPO 1997 10 30 08 23 85 2.7 -9 664.40 -56.2 -53.0 -53.4 69 -99 SPO 1997 10 30 08 24 88 2.7 -9 664.40 -56.2 -53.2 -53.6 69 -99 SPO 1997 10 30 08 25 81 3.0 -9 664.30 -56.2 -53.2 -53.5 69 -99 SPO 1997 10 30 08 26 76 3.3 -9 664.30 -56.2 -53.0 -53.9 69 -99 SPO 1997 10 30 08 27 74 3.4 -9 664.30 -56.3 -52.8 -54.6 69 -99 SPO 1997 10 30 08 28 75 3.3 -9 664.30 -56.4 -52.8 -54.7 69 -99 SPO 1997 10 30 08 29 75 3.2 -9 664.30 -56.4 -52.9 -54.5 69 -99 SPO 1997 10 30 08 30 76 3.3 -9 664.30 -56.4 -52.8 -54.4 69 -99 SPO 1997 10 30 08 31 76 3.5 -9 664.30 -56.3 -52.8 -54.6 68 -99 SPO 1997 10 30 08 32 76 3.6 -9 664.30 -56.2 -52.7 -54.7 67 -99 SPO 1997 10 30 08 33 77 3.7 -9 664.30 -56.3 -52.7 -54.8 68 -99 SPO 1997 10 30 08 34 78 3.8 -9 664.30 -56.2 -52.7 -54.8 67 -99 SPO 1997 10 30 08 35 80 3.8 -9 664.30 -56.1 -52.7 -54.8 66 -99 SPO 1997 10 30 08 36 81 3.6 -9 664.30 -56.1 -52.8 -54.7 66 -99 SPO 1997 10 30 08 37 83 3.4 -9 664.30 -56.0 -52.8 -54.4 65 -99 SPO 1997 10 30 08 38 87 3.1 -9 664.30 -56.1 -53.0 -53.9 66 -99 SPO 1997 10 30 08 39 89 3.0 -9 664.30 -56.1 -53.0 -53.4 66 -99 SPO 1997 10 30 08 40 90 3.1 -9 664.30 -56.1 -53.0 -53.2 66 -99 SPO 1997 10 30 08 41 90 3.2 -9 664.30 -56.0 -53.0 -53.2 66 -99 SPO 1997 10 30 08 42 89 3.2 -9 664.30 -56.0 -52.9 -53.2 67 -99 SPO 1997 10 30 08 43 87 3.3 -9 664.30 -56.0 -52.9 -53.4 67 -99 SPO 1997 10 30 08 44 85 3.4 -9 664.30 -56.0 -52.8 -53.6 65 -99 SPO 1997 10 30 08 45 85 3.4 -9 664.30 -56.1 -52.8 -53.9 65 -99 SPO 1997 10 30 08 46 87 3.3 -9 664.30 -56.2 -52.8 -53.8 67 -99 SPO 1997 10 30 08 47 88 3.2 -9 664.30 -56.3 -52.8 -53.6 68 -99 SPO 1997 10 30 08 48 87 3.3 -9 664.20 -56.4 -52.8 -53.5 67 -99 SPO 1997 10 30 08 49 83 3.5 -9 664.20 -56.4 -52.8 -53.7 67 -99 SPO 1997 10 30 08 50 80 3.6 -9 664.20 -56.5 -52.7 -54.3 67 -99 SPO 1997 10 30 08 51 79 3.7 -9 664.20 -56.5 -52.6 -54.8 67 -99 SPO 1997 10 30 08 52 80 3.6 -9 664.20 -56.6 -52.6 -54.9 68 -99 SPO 1997 10 30 08 53 83 3.5 -9 664.30 -56.6 -52.6 -54.8 67 -99 SPO 1997 10 30 08 54 86 3.3 -9 664.30 -56.6 -52.7 -54.4 66 -99 SPO 1997 10 30 08 55 92 3.0 -9 664.30 -56.6 -52.8 -54.0 66 -99 SPO 1997 10 30 08 56 96 2.9 -9 664.30 -56.7 -52.9 -54.3 67 -99 SPO 1997 10 30 08 57 97 2.9 -9 664.30 -56.7 -52.9 -54.6 66 -99 SPO 1997 10 30 08 58 96 2.9 -9 664.30 -56.6 -52.9 -54.6 65 -99 SPO 1997 10 30 08 59 97 2.9 -9 664.30 -56.7 -52.9 -54.5 66 -99 SPO 1997 10 30 09 00 98 2.8 -9 664.30 -56.8 -52.9 -54.6 67 0 SPO 1997 10 30 09 01 99 2.7 -9 664.30 -56.8 -53.0 -54.8 66 -99 SPO 1997 10 30 09 02 101 2.7 -9 664.30 -56.6 -53.0 -55.0 64 -99 SPO 1997 10 30 09 03 102 2.7 -9 664.30 -56.5 -53.1 -55.0 64 -99 SPO 1997 10 30 09 04 101 2.9 -9 664.30 -56.4 -53.1 -54.9 64 -99 SPO 1997 10 30 09 05 98 3.0 -9 664.30 -56.4 -53.0 -54.9 64 -99 SPO 1997 10 30 09 06 97 3.0 -9 664.30 -56.4 -53.0 -54.7 64 -99 SPO 1997 10 30 09 07 100 3.0 -9 664.30 -56.5 -53.1 -54.8 64 -99 SPO 1997 10 30 09 08 104 3.0 -9 664.30 -56.4 -53.2 -55.0 64 -99 SPO 1997 10 30 09 09 108 2.9 -9 664.30 -56.3 -53.3 -55.2 63 -99 SPO 1997 10 30 09 10 108 3.0 -9 664.30 -56.2 -53.2 -55.1 62 -99 SPO 1997 10 30 09 11 107 3.0 -9 664.30 -56.2 -53.2 -55.1 64 -99 SPO 1997 10 30 09 12 107 3.0 -9 664.30 -56.1 -53.3 -55.1 64 -99 SPO 1997 10 30 09 13 114 2.9 -9 664.30 -55.7 -53.4 -54.8 62 -99 SPO 1997 10 30 09 14 121 2.8 -9 664.30 -55.4 -53.6 -54.5 62 -99 SPO 1997 10 30 09 15 123 2.8 -9 664.30 -55.4 -53.7 -54.5 64 -99 SPO 1997 10 30 09 16 118 2.9 -9 664.30 -55.3 -53.6 -54.6 65 -99 SPO 1997 10 30 09 17 115 3.0 -9 664.30 -55.9 -53.6 -55.0 69 -99 SPO 1997 10 30 09 18 113 3.1 -9 664.30 -56.3 -53.5 -55.3 72 -99 SPO 1997 10 30 09 19 110 3.2 -9 664.20 -56.4 -53.5 -55.4 70 -99 SPO 1997 10 30 09 20 108 3.2 -9 664.20 -56.6 -53.4 -55.4 70 -99 SPO 1997 10 30 09 21 106 3.1 -9 664.20 -56.7 -53.4 -55.3 69 -99 SPO 1997 10 30 09 22 105 3.0 -9 664.20 -56.8 -53.3 -55.3 68 -99 SPO 1997 10 30 09 23 102 3.0 -9 664.20 -56.8 -53.3 -55.1 67 -99 SPO 1997 10 30 09 24 98 2.9 -9 664.20 -56.8 -53.2 -54.7 66 -99 SPO 1997 10 30 09 25 97 2.9 -9 664.20 -56.8 -53.1 -54.4 67 -99 SPO 1997 10 30 09 26 99 2.8 -9 664.20 -56.7 -53.1 -54.2 66 -99 SPO 1997 10 30 09 27 106 2.6 -9 664.20 -56.7 -53.3 -54.4 66 -99 SPO 1997 10 30 09 28 112 2.6 -9 664.20 -56.7 -53.5 -54.9 66 -99 SPO 1997 10 30 09 29 112 2.5 -9 664.20 -56.6 -53.6 -55.1 65 -99 SPO 1997 10 30 09 30 108 2.5 -9 664.20 -56.5 -53.5 -55.2 64 -99 SPO 1997 10 30 09 31 110 2.4 -9 664.20 -56.5 -53.4 -55.1 64 -99 SPO 1997 10 30 09 32 115 2.3 -9 664.20 -56.1 -53.4 -54.9 62 -99 SPO 1997 10 30 09 33 118 2.3 -9 664.30 -55.5 -53.6 -54.6 60 -99 SPO 1997 10 30 09 34 120 2.3 -9 664.30 -55.2 -53.6 -54.3 61 -99 SPO 1997 10 30 09 35 116 2.3 -9 664.30 -55.2 -53.5 -54.3 62 -99 SPO 1997 10 30 09 36 116 2.2 -9 664.30 -55.3 -53.5 -54.3 65 -99 SPO 1997 10 30 09 37 117 2.3 -9 664.30 -55.6 -53.6 -54.4 67 -99 SPO 1997 10 30 09 38 115 2.2 -9 664.30 -55.7 -53.6 -54.4 66 -99 SPO 1997 10 30 09 39 111 2.4 -9 664.20 -55.6 -53.6 -54.4 65 -99 SPO 1997 10 30 09 40 109 2.4 -9 664.20 -55.6 -53.5 -54.4 65 -99 SPO 1997 10 30 09 41 107 2.4 -9 664.20 -55.6 -53.5 -54.5 65 -99 SPO 1997 10 30 09 42 104 2.5 -9 664.20 -55.8 -53.5 -54.6 66 -99 SPO 1997 10 30 09 43 100 2.5 -9 664.20 -56.1 -53.4 -54.7 69 -99 SPO 1997 10 30 09 44 99 2.5 -9 664.20 -56.4 -53.2 -54.6 69 -99 SPO 1997 10 30 09 45 100 2.4 -9 664.20 -56.4 -53.2 -54.6 69 -99 SPO 1997 10 30 09 46 103 2.5 -9 664.20 -56.4 -53.1 -54.7 67 -99 SPO 1997 10 30 09 47 103 2.5 -9 664.10 -56.3 -53.1 -54.7 66 -99 SPO 1997 10 30 09 48 104 2.5 -9 664.10 -56.2 -53.1 -54.7 65 -99 SPO 1997 10 30 09 49 104 2.5 -9 664.10 -56.1 -53.1 -54.6 65 -99 SPO 1997 10 30 09 50 103 2.6 -9 664.10 -56.3 -53.0 -54.8 67 -99 SPO 1997 10 30 09 51 105 2.5 -9 664.10 -56.4 -53.0 -54.9 67 -99 SPO 1997 10 30 09 52 109 2.5 -9 664.10 -56.3 -53.1 -55.0 65 -99 SPO 1997 10 30 09 53 109 2.5 -9 664.10 -56.0 -53.1 -54.8 63 -99 SPO 1997 10 30 09 54 105 2.4 -9 664.00 -55.9 -53.1 -54.7 64 -99 SPO 1997 10 30 09 55 104 2.5 -9 664.00 -56.2 -53.1 -54.8 68 -99 SPO 1997 10 30 09 56 110 2.5 -9 664.10 -56.2 -53.1 -54.9 68 -99 SPO 1997 10 30 09 57 116 2.7 -9 664.10 -56.1 -53.2 -54.8 68 -99 SPO 1997 10 30 09 58 113 2.9 -9 664.10 -55.8 -53.2 -54.8 65 -99 SPO 1997 10 30 09 59 107 3.0 -9 664.10 -56.0 -53.0 -54.8 68 -99 SPO 1997 10 30 10 00 105 3.1 -9 664.10 -56.4 -52.8 -55.0 71 0 SPO 1997 10 30 10 01 106 3.1 -9 664.10 -56.5 -52.9 -55.2 70 -99 SPO 1997 10 30 10 02 106 3.1 -9 664.10 -56.5 -52.9 -55.4 69 -99 SPO 1997 10 30 10 03 102 3.3 -9 664.10 -56.5 -52.8 -55.2 68 -99 SPO 1997 10 30 10 04 102 3.3 -9 664.10 -56.4 -52.7 -55.0 66 -99 SPO 1997 10 30 10 05 102 3.3 -9 664.10 -56.4 -52.6 -55.0 66 -99 SPO 1997 10 30 10 06 103 3.2 -9 664.10 -56.6 -52.6 -55.3 67 -99 SPO 1997 10 30 10 07 103 3.3 -9 664.10 -56.7 -52.6 -55.5 66 -99 SPO 1997 10 30 10 08 102 3.4 -9 664.10 -56.7 -52.4 -55.4 65 -99 SPO 1997 10 30 10 09 105 3.3 -9 664.10 -56.7 -52.3 -55.4 65 -99 SPO 1997 10 30 10 10 111 3.2 -9 664.10 -56.7 -52.4 -55.6 65 -99 SPO 1997 10 30 10 11 114 3.2 -9 664.10 -56.6 -52.5 -55.7 64 -99 SPO 1997 10 30 10 12 113 3.2 -9 664.10 -56.5 -52.4 -55.6 64 -99 SPO 1997 10 30 10 13 109 3.3 -9 664.00 -56.5 -52.3 -55.6 65 -99 SPO 1997 10 30 10 14 106 3.3 -9 664.00 -56.4 -52.2 -55.4 64 -99 SPO 1997 10 30 10 15 106 3.3 -9 664.00 -56.4 -52.2 -55.4 64 -99 SPO 1997 10 30 10 16 105 3.3 -9 664.00 -56.4 -52.2 -55.4 65 -99 SPO 1997 10 30 10 17 105 3.2 -9 664.00 -56.5 -52.2 -55.5 66 -99 SPO 1997 10 30 10 18 102 3.3 -9 664.00 -56.4 -52.2 -55.4 65 -99 SPO 1997 10 30 10 19 101 3.2 -9 664.00 -56.4 -52.2 -55.3 65 -99 SPO 1997 10 30 10 20 101 3.2 -9 664.00 -56.4 -52.2 -55.2 65 -99 SPO 1997 10 30 10 21 101 3.3 -9 664.00 -56.5 -52.2 -55.3 66 -99 SPO 1997 10 30 10 22 98 3.4 -9 664.00 -56.4 -52.2 -55.1 65 -99 SPO 1997 10 30 10 23 96 3.4 -9 664.00 -56.3 -52.2 -54.8 64 -99 SPO 1997 10 30 10 24 97 3.4 -9 664.00 -56.4 -52.2 -54.7 66 -99 SPO 1997 10 30 10 25 98 3.3 -9 664.00 -56.4 -52.2 -54.7 67 -99 SPO 1997 10 30 10 26 100 3.2 -9 664.00 -56.4 -52.2 -54.8 67 -99 SPO 1997 10 30 10 27 100 3.2 -9 664.00 -56.4 -52.3 -54.9 67 -99 SPO 1997 10 30 10 28 99 3.2 -9 664.00 -56.4 -52.3 -54.8 67 -99 SPO 1997 10 30 10 29 95 3.4 -9 664.00 -56.4 -52.2 -54.6 67 -99 SPO 1997 10 30 10 30 93 3.4 -9 664.00 -56.4 -52.2 -54.5 67 -99 SPO 1997 10 30 10 31 93 3.3 -9 663.90 -56.3 -52.2 -54.4 66 -99 SPO 1997 10 30 10 32 94 3.2 -9 663.90 -56.3 -52.2 -54.2 66 -99 SPO 1997 10 30 10 33 93 3.1 -9 663.90 -56.3 -52.2 -54.1 66 -99 SPO 1997 10 30 10 34 93 2.9 -9 664.00 -56.3 -52.2 -54.0 66 -99 SPO 1997 10 30 10 35 94 2.8 -9 664.00 -56.3 -52.3 -53.8 66 -99 SPO 1997 10 30 10 36 95 2.7 -9 664.00 -56.3 -52.4 -53.8 66 -99 SPO 1997 10 30 10 37 96 2.7 -9 664.00 -56.2 -52.5 -53.6 66 -99 SPO 1997 10 30 10 38 97 2.5 -9 664.00 -56.3 -52.6 -53.5 68 -99 SPO 1997 10 30 10 39 103 2.4 -9 664.00 -56.3 -53.0 -53.6 68 -99 SPO 1997 10 30 10 40 105 2.4 -9 664.00 -56.2 -53.4 -54.0 68 -99 SPO 1997 10 30 10 41 101 2.5 -9 664.00 -56.2 -53.4 -54.1 69 -99 SPO 1997 10 30 10 42 98 2.6 -9 664.00 -56.2 -53.1 -54.0 69 -99 SPO 1997 10 30 10 43 96 2.6 -9 664.00 -56.2 -52.9 -53.8 69 -99 SPO 1997 10 30 10 44 95 2.6 -9 664.00 -56.2 -52.8 -53.4 69 -99 SPO 1997 10 30 10 45 95 2.5 -9 664.00 -56.2 -52.7 -53.2 69 -99 SPO 1997 10 30 10 46 98 2.4 -9 664.00 -56.2 -52.8 -53.3 69 -99 SPO 1997 10 30 10 47 102 2.3 -9 664.00 -56.1 -53.0 -53.6 69 -99 SPO 1997 10 30 10 48 102 2.3 -9 664.00 -56.1 -53.2 -53.9 69 -99 SPO 1997 10 30 10 49 99 2.3 -9 664.00 -56.0 -53.2 -53.8 68 -99 SPO 1997 10 30 10 50 97 2.3 -9 664.00 -56.0 -52.9 -53.3 68 -99 SPO 1997 10 30 10 51 97 2.3 -9 664.00 -56.1 -52.7 -53.0 68 -99 SPO 1997 10 30 10 52 99 2.2 -9 664.00 -56.1 -52.8 -53.2 68 -99 SPO 1997 10 30 10 53 100 1.9 -9 664.00 -56.1 -53.0 -53.4 68 -99 SPO 1997 10 30 10 54 100 1.9 -9 664.00 -56.0 -53.3 -53.6 67 -99 SPO 1997 10 30 10 55 97 2.0 -9 663.90 -56.0 -53.2 -53.4 67 -99 SPO 1997 10 30 10 56 93 2.2 -9 663.90 -56.0 -53.0 -52.8 69 -99 SPO 1997 10 30 10 57 91 2.2 -9 663.90 -56.1 -52.8 -52.4 69 -99 SPO 1997 10 30 10 58 92 2.1 -9 663.90 -56.2 -52.7 -52.3 70 -99 SPO 1997 10 30 10 59 97 2.0 -9 664.00 -56.2 -52.8 -52.7 69 -99 SPO 1997 10 30 11 00 103 2.0 -9 664.00 -56.2 -53.0 -53.6 69 0 SPO 1997 10 30 11 01 105 2.0 -9 664.00 -56.1 -53.3 -54.1 68 -99 SPO 1997 10 30 11 02 104 2.0 -9 664.00 -56.1 -53.3 -54.2 68 -99 SPO 1997 10 30 11 03 102 1.9 -9 664.00 -56.2 -53.2 -54.2 68 -99 SPO 1997 10 30 11 04 104 1.9 -9 664.00 -56.2 -53.3 -54.2 68 -99 SPO 1997 10 30 11 05 115 1.8 -9 664.00 -56.0 -53.4 -54.3 66 -99 SPO 1997 10 30 11 06 118 1.8 -9 664.00 -55.8 -53.5 -54.1 65 -99 SPO 1997 10 30 11 07 112 1.8 -9 663.90 -56.0 -53.2 -54.2 67 -99 SPO 1997 10 30 11 08 105 1.9 -9 663.90 -56.1 -52.8 -54.2 69 -99 SPO 1997 10 30 11 09 101 2.0 -9 663.90 -56.2 -52.4 -54.0 69 -99 SPO 1997 10 30 11 10 98 2.1 -9 663.90 -56.1 -52.2 -53.5 67 -99 SPO 1997 10 30 11 11 95 2.0 -9 663.90 -56.0 -52.1 -53.1 65 -99 SPO 1997 10 30 11 12 93 1.9 -9 663.90 -56.0 -52.1 -52.8 65 -99 SPO 1997 10 30 11 13 92 2.0 -9 663.90 -55.9 -52.1 -52.6 65 -99 SPO 1997 10 30 11 14 90 2.3 -9 663.90 -55.8 -52.0 -52.6 65 -99 SPO 1997 10 30 11 15 90 2.4 -9 663.90 -55.7 -51.9 -52.7 65 -99 SPO 1997 10 30 11 16 90 2.3 -9 663.90 -55.6 -51.9 -52.8 65 -99 SPO 1997 10 30 11 17 91 2.3 -9 663.90 -55.6 -51.9 -52.8 66 -99 SPO 1997 10 30 11 18 92 2.3 -9 663.90 -55.6 -51.9 -52.7 66 -99 SPO 1997 10 30 11 19 93 2.4 -9 663.90 -55.6 -51.9 -52.8 66 -99 SPO 1997 10 30 11 20 93 2.5 -9 663.90 -55.6 -51.9 -52.8 67 -99 SPO 1997 10 30 11 21 93 2.5 -9 663.90 -55.6 -51.8 -52.8 67 -99 SPO 1997 10 30 11 22 94 2.4 -9 663.90 -55.6 -51.8 -52.8 68 -99 SPO 1997 10 30 11 23 94 2.4 -9 663.90 -55.6 -51.8 -52.8 68 -99 SPO 1997 10 30 11 24 91 2.4 -9 663.90 -55.6 -51.8 -52.9 68 -99 SPO 1997 10 30 11 25 88 2.5 -9 663.90 -55.7 -51.8 -52.9 69 -99 SPO 1997 10 30 11 26 87 2.6 -9 663.90 -55.7 -51.8 -52.9 69 -99 SPO 1997 10 30 11 27 88 2.7 -9 663.90 -55.8 -51.8 -52.9 68 -99 SPO 1997 10 30 11 28 89 2.8 -9 663.90 -56.0 -51.9 -53.0 69 -99 SPO 1997 10 30 11 29 89 2.8 -9 663.90 -56.2 -52.0 -53.2 69 -99 SPO 1997 10 30 11 30 88 3.0 -9 663.90 -56.3 -52.0 -53.3 69 -99 SPO 1997 10 30 11 31 85 3.1 -9 663.90 -56.4 -52.0 -53.5 69 -99 SPO 1997 10 30 11 32 84 3.2 -9 663.90 -56.4 -52.0 -54.0 68 -99 SPO 1997 10 30 11 33 85 3.2 -9 663.90 -56.5 -52.0 -54.1 68 -99 SPO 1997 10 30 11 34 88 3.1 -9 663.90 -56.6 -52.0 -54.0 68 -99 SPO 1997 10 30 11 35 91 3.0 -9 663.90 -56.6 -52.1 -53.8 68 -99 SPO 1997 10 30 11 36 93 3.0 -9 663.90 -56.6 -52.1 -53.8 68 -99 SPO 1997 10 30 11 37 93 3.1 -9 663.90 -56.5 -52.1 -53.7 67 -99 SPO 1997 10 30 11 38 93 3.1 -9 663.90 -56.4 -52.1 -53.8 65 -99 SPO 1997 10 30 11 39 93 3.1 -9 663.90 -56.5 -52.2 -53.9 66 -99 SPO 1997 10 30 11 40 91 3.1 -9 663.90 -56.6 -52.2 -53.9 67 -99 SPO 1997 10 30 11 41 90 3.0 -9 663.90 -56.6 -52.2 -53.9 67 -99 SPO 1997 10 30 11 42 91 2.9 -9 663.90 -56.6 -52.2 -53.9 67 -99 SPO 1997 10 30 11 43 90 2.9 -9 663.90 -56.6 -52.2 -53.8 67 -99 SPO 1997 10 30 11 44 88 3.0 -9 663.90 -56.5 -52.2 -53.8 66 -99 SPO 1997 10 30 11 45 87 3.1 -9 663.90 -56.5 -52.1 -53.7 65 -99 SPO 1997 10 30 11 46 86 3.2 -9 663.90 -56.6 -52.1 -53.8 66 -99 SPO 1997 10 30 11 47 85 3.3 -9 663.90 -56.5 -52.0 -53.8 65 -99 SPO 1997 10 30 11 48 85 3.4 -9 663.90 -56.4 -52.0 -53.8 65 -99 SPO 1997 10 30 11 49 84 3.5 -9 663.90 -56.4 -52.0 -53.9 65 -99 SPO 1997 10 30 11 50 83 3.7 -9 663.90 -56.4 -52.0 -54.0 66 -99 SPO 1997 10 30 11 51 81 3.9 -9 663.80 -56.4 -52.0 -54.4 67 -99 SPO 1997 10 30 11 52 79 3.9 -9 663.80 -56.4 -51.9 -54.7 67 -99 SPO 1997 10 30 11 53 79 4.0 -9 663.80 -56.4 -51.9 -54.9 67 -99 SPO 1997 10 30 11 54 78 4.0 -9 663.80 -56.4 -51.9 -54.9 67 -99 SPO 1997 10 30 11 55 78 4.0 -9 663.80 -56.3 -51.9 -54.9 66 -99 SPO 1997 10 30 11 56 79 3.9 -9 663.80 -56.3 -52.0 -54.8 67 -99 SPO 1997 10 30 11 57 82 3.8 -9 663.80 -56.2 -52.0 -54.4 66 -99 SPO 1997 10 30 11 58 85 3.6 -9 663.80 -56.2 -52.1 -54.1 66 -99 SPO 1997 10 30 11 59 87 3.4 -9 663.80 -56.2 -52.2 -54.0 66 -99 SPO 1997 10 30 12 00 88 3.4 -9 663.80 -56.2 -52.2 -54.0 67 0 SPO 1997 10 30 12 01 88 3.4 -9 663.80 -56.2 -52.2 -54.0 67 -99 SPO 1997 10 30 12 02 88 3.5 -9 663.80 -56.2 -52.2 -54.0 67 -99 SPO 1997 10 30 12 03 88 3.5 -9 663.80 -56.2 -52.2 -54.0 66 -99 SPO 1997 10 30 12 04 88 3.5 -9 663.80 -56.3 -52.2 -53.9 67 -99 SPO 1997 10 30 12 05 89 3.4 -9 663.80 -56.4 -52.2 -54.0 67 -99 SPO 1997 10 30 12 06 89 3.4 -9 663.80 -56.4 -52.2 -54.0 67 -99 SPO 1997 10 30 12 07 90 3.4 -9 663.80 -56.4 -52.2 -54.1 67 -99 SPO 1997 10 30 12 08 90 3.5 -9 663.80 -56.3 -52.2 -54.1 66 -99 SPO 1997 10 30 12 09 91 3.5 -9 663.80 -56.3 -52.2 -54.1 66 -99 SPO 1997 10 30 12 10 93 3.5 -9 663.80 -56.4 -52.2 -54.3 67 -99 SPO 1997 10 30 12 11 92 3.6 -9 663.80 -56.5 -52.2 -54.3 68 -99 SPO 1997 10 30 12 12 91 3.7 -9 663.80 -56.5 -52.2 -54.3 68 -99 SPO 1997 10 30 12 13 90 3.8 -9 663.80 -56.5 -52.1 -54.4 68 -99 SPO 1997 10 30 12 14 89 3.8 -9 663.80 -56.6 -52.1 -54.5 68 -99 SPO 1997 10 30 12 15 91 3.8 -9 663.80 -56.6 -52.1 -54.6 68 -99 SPO 1997 10 30 12 16 92 3.8 -9 663.80 -56.6 -52.0 -54.6 67 -99 SPO 1997 10 30 12 17 93 3.8 -9 663.80 -56.6 -52.0 -54.7 67 -99 SPO 1997 10 30 12 18 94 3.7 -9 663.80 -56.6 -52.0 -54.7 67 -99 SPO 1997 10 30 12 19 93 3.7 -9 663.80 -56.6 -52.0 -54.6 67 -99 SPO 1997 10 30 12 20 92 3.6 -9 663.80 -56.6 -52.0 -54.6 66 -99 SPO 1997 10 30 12 21 94 3.6 -9 663.80 -56.6 -52.0 -54.6 66 -99 SPO 1997 10 30 12 22 99 3.4 -9 663.80 -56.6 -52.0 -54.6 66 -99 SPO 1997 10 30 12 23 103 3.2 -9 663.80 -56.6 -52.1 -54.6 67 -99 SPO 1997 10 30 12 24 105 3.2 -9 663.80 -56.5 -52.1 -54.8 67 -99 SPO 1997 10 30 12 25 105 3.2 -9 663.80 -56.6 -52.1 -54.8 68 -99 SPO 1997 10 30 12 26 107 3.1 -9 663.80 -56.5 -52.1 -54.7 67 -99 SPO 1997 10 30 12 27 109 3.0 -9 663.80 -56.5 -52.1 -54.7 68 -99 SPO 1997 10 30 12 28 111 3.0 -9 663.80 -56.6 -52.1 -55.0 68 -99 SPO 1997 10 30 12 29 111 2.9 -9 663.80 -56.6 -52.0 -55.0 68 -99 SPO 1997 10 30 12 30 112 2.8 -9 663.80 -56.8 -52.0 -55.2 68 -99 SPO 1997 10 30 12 31 112 2.8 -9 663.80 -56.9 -52.0 -55.3 69 -99 SPO 1997 10 30 12 32 109 2.8 -9 663.80 -56.9 -52.0 -55.1 68 -99 SPO 1997 10 30 12 33 111 2.8 -9 663.80 -57.0 -52.0 -55.0 68 -99 SPO 1997 10 30 12 34 114 2.7 -9 663.80 -57.2 -52.0 -55.2 70 -99 SPO 1997 10 30 12 35 111 2.7 -9 663.90 -57.2 -52.2 -55.2 68 -99 SPO 1997 10 30 12 36 107 2.8 -9 663.90 -57.2 -52.2 -55.1 68 -99 SPO 1997 10 30 12 37 106 2.9 -9 663.90 -57.2 -52.1 -54.9 68 -99 SPO 1997 10 30 12 38 105 2.9 -9 663.90 -57.0 -52.0 -54.8 66 -99 SPO 1997 10 30 12 39 103 3.0 -9 663.80 -56.8 -51.9 -54.6 64 -99 SPO 1997 10 30 12 40 100 2.9 -9 663.80 -56.6 -51.9 -54.4 64 -99 SPO 1997 10 30 12 41 97 3.1 -9 663.80 -56.7 -51.9 -54.4 66 -99 SPO 1997 10 30 12 42 96 3.1 -9 663.80 -56.7 -51.8 -54.4 68 -99 SPO 1997 10 30 12 43 99 3.1 -9 663.80 -56.7 -51.8 -54.4 68 -99 SPO 1997 10 30 12 44 102 3.0 -9 663.80 -56.8 -51.8 -54.4 68 -99 SPO 1997 10 30 12 45 102 3.0 -9 663.80 -56.8 -51.9 -54.5 68 -99 SPO 1997 10 30 12 46 101 3.0 -9 663.80 -56.8 -51.9 -54.5 68 -99 SPO 1997 10 30 12 47 102 2.9 -9 663.80 -56.8 -51.9 -54.5 68 -99 SPO 1997 10 30 12 48 102 2.9 -9 663.80 -56.8 -51.9 -54.5 68 -99 SPO 1997 10 30 12 49 101 3.0 -9 663.80 -56.8 -51.9 -54.4 68 -99 SPO 1997 10 30 12 50 98 3.0 -9 663.80 -56.7 -51.9 -54.4 67 -99 SPO 1997 10 30 12 51 94 3.2 -9 663.70 -56.7 -51.9 -54.3 67 -99 SPO 1997 10 30 12 52 91 3.3 -9 663.70 -56.6 -51.8 -54.3 66 -99 SPO 1997 10 30 12 53 89 3.4 -9 663.70 -56.6 -51.8 -54.4 66 -99 SPO 1997 10 30 12 54 89 3.4 -9 663.70 -56.4 -51.8 -54.4 64 -99 SPO 1997 10 30 12 55 89 3.4 -9 663.70 -56.4 -51.9 -54.4 65 -99 SPO 1997 10 30 12 56 91 3.4 -9 663.70 -56.4 -51.9 -54.4 66 -99 SPO 1997 10 30 12 57 95 3.3 -9 663.70 -56.4 -51.9 -54.3 67 -99 SPO 1997 10 30 12 58 98 3.4 -9 663.70 -56.4 -51.9 -54.4 68 -99 SPO 1997 10 30 12 59 96 3.5 -9 663.70 -56.4 -51.9 -54.4 68 -99 SPO 1997 10 30 13 00 95 3.7 -9 663.70 -56.4 -51.9 -54.4 69 0 SPO 1997 10 30 13 01 97 3.5 -9 663.70 -56.4 -51.9 -54.4 69 -99 SPO 1997 10 30 13 02 102 3.4 -9 663.70 -56.3 -51.9 -54.6 68 -99 SPO 1997 10 30 13 03 101 3.4 -9 663.70 -56.3 -52.0 -54.8 68 -99 SPO 1997 10 30 13 04 96 3.6 -9 663.70 -56.2 -52.0 -54.6 67 -99 SPO 1997 10 30 13 05 93 3.7 -9 663.70 -56.2 -51.9 -54.4 68 -99 SPO 1997 10 30 13 06 91 3.6 -9 663.70 -56.2 -51.9 -54.4 68 -99 SPO 1997 10 30 13 07 89 3.5 -9 663.60 -56.2 -51.9 -54.4 68 -99 SPO 1997 10 30 13 08 87 3.6 -9 663.60 -56.2 -51.9 -54.4 67 -99 SPO 1997 10 30 13 09 86 3.6 -9 663.60 -56.2 -51.9 -54.5 67 -99 SPO 1997 10 30 13 10 87 3.5 -9 663.60 -56.3 -51.9 -54.5 68 -99 SPO 1997 10 30 13 11 87 3.4 -9 663.60 -56.4 -51.9 -54.5 69 -99 SPO 1997 10 30 13 12 84 3.4 -9 663.60 -56.5 -51.9 -54.6 69 -99 SPO 1997 10 30 13 13 81 3.5 -9 663.60 -56.5 -51.9 -54.8 69 -99 SPO 1997 10 30 13 14 80 3.6 -9 663.60 -56.5 -51.9 -55.1 69 -99 SPO 1997 10 30 13 15 78 3.7 -9 663.60 -56.5 -51.9 -55.3 68 -99 SPO 1997 10 30 13 16 76 3.8 -9 663.60 -56.5 -51.9 -55.4 68 -99 SPO 1997 10 30 13 17 75 3.8 -9 663.50 -56.4 -51.9 -55.4 68 -99 SPO 1997 10 30 13 18 74 3.9 -9 663.50 -56.4 -51.9 -55.4 68 -99 SPO 1997 10 30 13 19 73 3.9 -9 663.50 -56.4 -51.9 -55.4 69 -99 SPO 1997 10 30 13 20 74 3.8 -9 663.50 -56.3 -51.9 -55.4 68 -99 SPO 1997 10 30 13 21 73 3.8 -9 663.50 -56.3 -52.0 -55.4 68 -99 SPO 1997 10 30 13 22 73 3.8 -9 663.50 -56.4 -52.0 -55.4 69 -99 SPO 1997 10 30 13 23 73 3.8 -9 663.50 -56.3 -52.0 -55.4 68 -99 SPO 1997 10 30 13 24 73 4.0 -9 663.50 -56.3 -52.0 -55.3 68 -99 SPO 1997 10 30 13 25 73 4.0 -9 663.50 -56.2 -52.0 -55.3 66 -99 SPO 1997 10 30 13 26 72 4.1 -9 663.50 -56.2 -52.0 -55.3 67 -99 SPO 1997 10 30 13 27 71 4.2 -9 663.50 -56.3 -52.0 -55.3 68 -99 SPO 1997 10 30 13 28 70 4.3 -9 663.50 -56.3 -52.0 -55.3 69 -99 SPO 1997 10 30 13 29 70 4.2 -9 663.50 -56.3 -52.0 -55.3 69 -99 SPO 1997 10 30 13 30 71 4.2 -9 663.50 -56.2 -52.0 -55.2 69 -99 SPO 1997 10 30 13 31 72 4.0 -9 663.50 -56.1 -52.0 -55.2 68 -99 SPO 1997 10 30 13 32 73 4.1 -9 663.50 -56.1 -52.0 -55.1 68 -99 SPO 1997 10 30 13 33 74 4.1 -9 663.40 -56.2 -52.0 -55.0 69 -99 SPO 1997 10 30 13 34 73 4.2 -9 663.40 -56.2 -51.9 -55.0 69 -99 SPO 1997 10 30 13 35 72 4.3 -9 663.40 -56.2 -51.9 -55.1 69 -99 SPO 1997 10 30 13 36 71 4.3 -9 663.40 -56.2 -51.9 -55.2 69 -99 SPO 1997 10 30 13 37 70 4.3 -9 663.40 -56.2 -51.9 -55.2 69 -99 SPO 1997 10 30 13 38 72 4.3 -9 663.40 -56.2 -51.9 -55.2 69 -99 SPO 1997 10 30 13 39 72 4.5 -9 663.40 -56.2 -51.9 -55.2 68 -99 SPO 1997 10 30 13 40 72 4.5 -9 663.40 -56.2 -51.9 -55.2 67 -99 SPO 1997 10 30 13 41 71 4.6 -9 663.40 -56.1 -51.9 -55.3 66 -99 SPO 1997 10 30 13 42 70 4.6 -9 663.40 -56.1 -51.9 -55.2 66 -99 SPO 1997 10 30 13 43 70 4.7 -9 663.40 -56.0 -51.9 -55.2 66 -99 SPO 1997 10 30 13 44 69 4.8 -9 663.40 -56.0 -51.8 -55.2 67 -99 SPO 1997 10 30 13 45 70 4.7 -9 663.40 -55.9 -51.8 -55.2 66 -99 SPO 1997 10 30 13 46 71 4.7 -9 663.40 -55.9 -51.8 -55.1 66 -99 SPO 1997 10 30 13 47 70 4.8 -9 663.40 -55.9 -51.8 -55.2 65 -99 SPO 1997 10 30 13 48 68 4.8 -9 663.40 -55.9 -51.8 -55.2 65 -99 SPO 1997 10 30 13 49 67 4.9 -9 663.40 -55.8 -51.8 -55.1 65 -99 SPO 1997 10 30 13 50 66 4.9 -9 663.40 -55.8 -51.9 -55.1 65 -99 SPO 1997 10 30 13 51 67 4.9 -9 663.40 -55.8 -51.9 -55.0 65 -99 SPO 1997 10 30 13 52 68 4.9 -9 663.40 -55.8 -51.9 -55.1 66 -99 SPO 1997 10 30 13 53 67 4.9 -9 663.40 -55.8 -51.9 -55.0 66 -99 SPO 1997 10 30 13 54 68 4.8 -9 663.40 -55.7 -51.9 -55.0 65 -99 SPO 1997 10 30 13 55 70 4.7 -9 663.50 -55.7 -51.9 -55.0 65 -99 SPO 1997 10 30 13 56 71 4.5 -9 663.50 -55.7 -52.0 -54.9 65 -99 SPO 1997 10 30 13 57 72 4.5 -9 663.50 -55.8 -52.0 -54.9 65 -99 SPO 1997 10 30 13 58 72 4.4 -9 663.50 -55.8 -52.0 -54.9 65 -99 SPO 1997 10 30 13 59 73 4.5 -9 663.50 -55.8 -52.2 -54.9 65 -99 SPO 1997 10 30 14 00 74 4.5 -9 663.50 -55.8 -52.2 -54.8 65 0 SPO 1997 10 30 14 01 74 4.7 -9 663.50 -55.8 -52.2 -54.8 65 -99 SPO 1997 10 30 14 02 73 4.7 -9 663.50 -55.9 -52.1 -54.9 66 -99 SPO 1997 10 30 14 03 72 4.6 -9 663.40 -55.9 -52.0 -55.0 66 -99 SPO 1997 10 30 14 04 71 4.6 -9 663.40 -55.9 -52.1 -55.0 66 -99 SPO 1997 10 30 14 05 71 4.6 -9 663.40 -55.9 -52.0 -55.0 66 -99 SPO 1997 10 30 14 06 71 4.5 -9 663.50 -55.9 -52.0 -55.0 66 -99 SPO 1997 10 30 14 07 73 4.3 -9 663.50 -55.9 -51.9 -55.0 66 -99 SPO 1997 10 30 14 08 75 4.1 -9 663.50 -55.9 -51.9 -54.8 65 -99 SPO 1997 10 30 14 09 77 3.9 -9 663.50 -55.9 -52.0 -54.6 65 -99 SPO 1997 10 30 14 10 79 3.8 -9 663.50 -56.0 -52.1 -54.4 65 -99 SPO 1997 10 30 14 11 78 3.8 -9 663.50 -56.0 -52.2 -54.4 64 -99 SPO 1997 10 30 14 12 76 3.8 -9 663.50 -56.1 -52.2 -54.5 64 -99 SPO 1997 10 30 14 13 75 3.8 -9 663.50 -56.1 -52.2 -54.8 63 -99 SPO 1997 10 30 14 14 76 3.8 -9 663.50 -56.1 -52.2 -54.9 64 -99 SPO 1997 10 30 14 15 77 3.7 -9 663.50 -56.2 -52.2 -54.8 64 -99 SPO 1997 10 30 14 16 79 3.6 -9 663.50 -56.2 -52.3 -54.8 64 -99 SPO 1997 10 30 14 17 80 3.6 -9 663.50 -56.2 -52.3 -54.8 64 -99 SPO 1997 10 30 14 18 82 3.4 -9 663.50 -56.2 -52.3 -54.6 64 -99 SPO 1997 10 30 14 19 85 3.3 -9 663.50 -56.2 -52.4 -54.4 64 -99 SPO 1997 10 30 14 20 88 3.1 -9 663.50 -56.4 -52.5 -54.3 66 -99 SPO 1997 10 30 14 21 92 3.0 -9 663.50 -56.4 -52.6 -54.4 65 -99 SPO 1997 10 30 14 22 94 2.9 -9 663.50 -56.6 -52.6 -54.8 66 -99 SPO 1997 10 30 14 23 94 2.8 -9 663.50 -56.6 -52.5 -55.0 65 -99 SPO 1997 10 30 14 24 95 2.8 -9 663.50 -56.7 -52.5 -55.1 66 -99 SPO 1997 10 30 14 25 94 2.8 -9 663.50 -56.7 -52.4 -55.0 65 -99 SPO 1997 10 30 14 26 95 2.8 -9 663.50 -56.6 -52.4 -54.7 64 -99 SPO 1997 10 30 14 27 104 2.5 -9 663.50 -56.6 -52.5 -54.8 64 -99 SPO 1997 10 30 14 28 114 2.4 -9 663.50 -56.5 -52.6 -55.2 63 -99 SPO 1997 10 30 14 29 110 2.5 -9 663.50 -56.3 -52.8 -55.2 61 -99 SPO 1997 10 30 14 30 100 2.6 -9 663.50 -56.4 -52.7 -55.3 63 -99 SPO 1997 10 30 14 31 96 2.6 -9 663.50 -56.8 -52.6 -55.3 67 -99 SPO 1997 10 30 14 32 96 2.5 -9 663.50 -57.0 -52.6 -55.2 67 -99 SPO 1997 10 30 14 33 96 2.5 -9 663.50 -57.0 -52.5 -55.2 65 -99 SPO 1997 10 30 14 34 94 2.6 -9 663.50 -57.0 -52.5 -54.8 65 -99 SPO 1997 10 30 14 35 92 2.6 -9 663.50 -57.0 -52.4 -54.4 64 -99 SPO 1997 10 30 14 36 93 2.7 -9 663.50 -57.0 -52.4 -54.3 63 -99 SPO 1997 10 30 14 37 98 2.5 -9 663.50 -57.1 -52.4 -54.3 64 -99 SPO 1997 10 30 14 38 100 2.3 -9 663.50 -57.1 -52.5 -54.6 63 -99 SPO 1997 10 30 14 39 99 2.3 -9 663.50 -57.1 -52.5 -54.7 64 -99 SPO 1997 10 30 14 40 100 2.3 -9 663.50 -57.0 -52.6 -54.6 63 -99 SPO 1997 10 30 14 41 103 2.2 -9 663.50 -57.0 -52.6 -54.8 63 -99 SPO 1997 10 30 14 42 103 2.2 -9 663.50 -57.0 -52.7 -54.7 63 -99 SPO 1997 10 30 14 43 105 2.1 -9 663.50 -57.1 -52.8 -54.8 64 -99 SPO 1997 10 30 14 44 109 2.0 -9 663.50 -57.0 -52.8 -55.0 63 -99 SPO 1997 10 30 14 45 112 1.9 -9 663.50 -57.0 -52.9 -55.0 63 -99 SPO 1997 10 30 14 46 111 1.9 -9 663.50 -56.8 -52.9 -54.8 62 -99 SPO 1997 10 30 14 47 111 1.9 -9 663.50 -56.8 -52.7 -54.8 62 -99 SPO 1997 10 30 14 48 108 1.9 -9 663.50 -56.8 -52.6 -54.8 63 -99 SPO 1997 10 30 14 49 103 2.0 -9 663.50 -56.9 -52.5 -54.9 63 -99 SPO 1997 10 30 14 50 97 2.2 -9 663.50 -56.8 -52.5 -54.4 63 -99 SPO 1997 10 30 14 51 96 2.2 -9 663.50 -57.0 -52.4 -54.2 64 -99 SPO 1997 10 30 14 52 96 2.2 -9 663.50 -57.0 -52.3 -54.0 64 -99 SPO 1997 10 30 14 53 99 2.2 -9 663.50 -56.9 -52.3 -54.1 63 -99 SPO 1997 10 30 14 54 101 2.2 -9 663.50 -56.8 -52.4 -54.4 62 -99 SPO 1997 10 30 14 55 100 2.3 -9 663.50 -56.6 -52.5 -54.3 61 -99 SPO 1997 10 30 14 56 95 2.3 -9 663.50 -56.6 -52.4 -54.0 62 -99 SPO 1997 10 30 14 57 93 2.3 -9 663.50 -56.8 -52.4 -53.9 64 -99 SPO 1997 10 30 14 58 95 2.3 -9 663.50 -56.9 -52.4 -54.0 65 -99 SPO 1997 10 30 14 59 96 2.2 -9 663.50 -56.8 -52.4 -54.0 64 -99 SPO 1997 10 30 15 00 93 2.3 -9 663.40 -56.8 -52.3 -53.8 64 0 SPO 1997 10 30 15 01 89 2.4 -9 663.40 -56.8 -52.2 -53.6 64 -99 SPO 1997 10 30 15 02 87 2.4 -9 663.40 -56.8 -52.1 -53.5 62 -99 SPO 1997 10 30 15 03 85 2.4 -9 663.40 -56.6 -52.1 -53.5 60 -99 SPO 1997 10 30 15 04 84 2.4 -9 663.40 -56.7 -52.1 -53.5 61 -99 SPO 1997 10 30 15 05 84 2.6 -9 663.40 -56.6 -52.1 -53.5 62 -99 SPO 1997 10 30 15 06 83 2.7 -9 663.30 -56.8 -52.0 -53.5 64 -99 SPO 1997 10 30 15 07 82 2.7 -9 663.30 -56.8 -52.0 -53.6 65 -99 SPO 1997 10 30 15 08 81 2.7 -9 663.30 -56.6 -51.9 -53.8 64 -99 SPO 1997 10 30 15 09 80 2.8 -9 663.30 -56.6 -51.9 -54.1 64 -99 SPO 1997 10 30 15 10 80 2.9 -9 663.30 -56.6 -51.9 -54.2 64 -99 SPO 1997 10 30 15 11 79 3.0 -9 663.30 -56.6 -51.9 -54.4 65 -99 SPO 1997 10 30 15 12 82 2.9 -9 663.30 -56.7 -51.9 -54.2 66 -99 SPO 1997 10 30 15 13 84 2.7 -9 663.30 -56.7 -51.9 -54.0 65 -99 SPO 1997 10 30 15 14 84 2.7 -9 663.30 -56.8 -52.0 -53.8 65 -99 SPO 1997 10 30 15 15 82 2.7 -9 663.30 -56.8 -52.0 -53.8 65 -99 SPO 1997 10 30 15 16 83 2.6 -9 663.30 -56.8 -52.0 -53.6 65 -99 SPO 1997 10 30 15 17 86 2.5 -9 663.30 -56.8 -52.0 -53.5 65 -99 SPO 1997 10 30 15 18 85 2.5 -9 663.30 -56.8 -52.0 -53.4 65 -99 SPO 1997 10 30 15 19 82 2.6 -9 663.30 -56.8 -52.0 -53.4 65 -99 SPO 1997 10 30 15 20 79 2.7 -9 663.30 -56.8 -52.0 -53.5 64 -99 SPO 1997 10 30 15 21 78 2.8 -9 663.30 -56.8 -51.9 -53.7 64 -99 SPO 1997 10 30 15 22 79 2.7 -9 663.20 -56.8 -52.0 -53.6 64 -99 SPO 1997 10 30 15 23 79 2.7 -9 663.20 -56.8 -52.0 -53.5 64 -99 SPO 1997 10 30 15 24 79 2.7 -9 663.20 -56.8 -52.1 -53.5 64 -99 SPO 1997 10 30 15 25 76 2.8 -9 663.20 -56.8 -52.0 -53.8 65 -99 SPO 1997 10 30 15 26 75 2.9 -9 663.20 -56.8 -52.0 -54.2 65 -99 SPO 1997 10 30 15 27 74 2.9 -9 663.20 -56.6 -52.0 -54.4 64 -99 SPO 1997 10 30 15 28 71 3.0 -9 663.20 -56.5 -52.0 -54.6 64 -99 SPO 1997 10 30 15 29 71 3.1 -9 663.20 -56.5 -52.0 -54.8 65 -99 SPO 1997 10 30 15 30 72 3.1 -9 663.20 -56.4 -51.9 -54.8 64 -99 SPO 1997 10 30 15 31 73 3.1 -9 663.20 -56.3 -52.0 -54.8 64 -99 SPO 1997 10 30 15 32 74 3.0 -9 663.20 -56.3 -52.0 -54.7 64 -99 SPO 1997 10 30 15 33 74 3.0 -9 663.20 -56.3 -52.2 -54.7 65 -99 SPO 1997 10 30 15 34 74 3.1 -9 663.20 -56.3 -52.2 -54.7 65 -99 SPO 1997 10 30 15 35 73 3.1 -9 663.20 -56.2 -52.2 -54.7 65 -99 SPO 1997 10 30 15 36 72 3.1 -9 663.20 -56.2 -52.2 -54.7 65 -99 SPO 1997 10 30 15 37 72 3.1 -9 663.20 -56.2 -52.2 -54.8 65 -99 SPO 1997 10 30 15 38 72 3.1 -9 663.20 -56.2 -52.1 -54.8 64 -99 SPO 1997 10 30 15 39 73 3.0 -9 663.20 -56.2 -52.2 -54.7 64 -99 SPO 1997 10 30 15 40 74 3.0 -9 663.20 -56.2 -52.2 -54.6 64 -99 SPO 1997 10 30 15 41 76 3.0 -9 663.20 -56.2 -52.2 -54.4 64 -99 SPO 1997 10 30 15 42 76 2.9 -9 663.20 -56.1 -52.2 -54.2 64 -99 SPO 1997 10 30 15 43 76 2.8 -9 663.20 -56.1 -52.3 -53.9 64 -99 SPO 1997 10 30 15 44 79 2.7 -9 663.20 -56.2 -52.3 -53.6 65 -99 SPO 1997 10 30 15 45 82 2.6 -9 663.20 -56.1 -52.3 -53.6 64 -99 SPO 1997 10 30 15 46 85 2.5 -9 663.20 -56.1 -52.4 -53.8 64 -99 SPO 1997 10 30 15 47 87 2.4 -9 663.20 -56.2 -52.5 -54.2 65 -99 SPO 1997 10 30 15 48 86 2.3 -9 663.20 -56.1 -52.6 -54.3 65 -99 SPO 1997 10 30 15 49 85 2.4 -9 663.20 -56.1 -52.5 -54.2 65 -99 SPO 1997 10 30 15 50 84 2.4 -9 663.20 -56.1 -52.5 -54.2 66 -99 SPO 1997 10 30 15 51 82 2.5 -9 663.20 -56.1 -52.4 -53.9 66 -99 SPO 1997 10 30 15 52 79 2.6 -9 663.10 -56.2 -52.4 -53.6 67 -99 SPO 1997 10 30 15 53 77 2.7 -9 663.10 -56.2 -52.3 -53.4 66 -99 SPO 1997 10 30 15 54 78 2.8 -9 663.10 -56.2 -52.3 -53.4 65 -99 SPO 1997 10 30 15 55 77 2.7 -9 663.10 -56.3 -52.3 -53.4 64 -99 SPO 1997 10 30 15 56 76 2.6 -9 663.10 -56.4 -52.3 -53.4 64 -99 SPO 1997 10 30 15 57 79 2.6 -9 663.10 -56.4 -52.3 -53.4 64 -99 SPO 1997 10 30 15 58 79 2.6 -9 663.10 -56.4 -52.3 -53.4 64 -99 SPO 1997 10 30 15 59 79 2.6 -9 663.10 -56.4 -52.4 -53.4 64 -99 SPO 1997 10 30 16 00 78 2.7 -9 663.10 -56.4 -52.2 -53.4 65 0 SPO 1997 10 30 16 01 76 2.8 -9 663.10 -56.3 -52.2 -53.4 64 -99 SPO 1997 10 30 16 02 74 2.9 -9 663.10 -56.4 -52.2 -53.6 65 -99 SPO 1997 10 30 16 03 75 2.9 -9 663.10 -56.4 -52.2 -54.0 65 -99 SPO 1997 10 30 16 04 75 2.9 -9 663.10 -56.4 -52.2 -54.2 65 -99 SPO 1997 10 30 16 05 76 2.8 -9 663.10 -56.4 -52.2 -54.2 65 -99 SPO 1997 10 30 16 06 77 2.8 -9 663.10 -56.4 -52.2 -54.0 64 -99 SPO 1997 10 30 16 07 76 2.8 -9 663.10 -56.4 -52.3 -53.8 64 -99 SPO 1997 10 30 16 08 77 2.7 -9 663.10 -56.4 -52.3 -53.6 64 -99 SPO 1997 10 30 16 09 80 2.7 -9 663.10 -56.3 -52.4 -53.5 64 -99 SPO 1997 10 30 16 10 85 2.6 -9 663.10 -56.3 -52.5 -53.6 64 -99 SPO 1997 10 30 16 11 88 2.5 -9 663.10 -56.2 -52.6 -53.8 63 -99 SPO 1997 10 30 16 12 88 2.6 -9 663.10 -56.2 -52.8 -54.1 63 -99 SPO 1997 10 30 16 13 88 2.7 -9 663.10 -56.2 -52.7 -54.0 63 -99 SPO 1997 10 30 16 14 85 2.7 -9 663.10 -56.2 -52.6 -53.7 64 -99 SPO 1997 10 30 16 15 84 2.8 -9 663.10 -56.2 -52.6 -53.6 64 -99 SPO 1997 10 30 16 16 84 2.8 -9 663.00 -56.2 -52.7 -53.5 64 -99 SPO 1997 10 30 16 17 82 2.9 -9 663.00 -56.2 -52.6 -53.7 64 -99 SPO 1997 10 30 16 18 80 3.0 -9 663.00 -56.1 -52.6 -54.0 64 -99 SPO 1997 10 30 16 19 80 3.0 -9 663.00 -56.2 -52.6 -54.2 64 -99 SPO 1997 10 30 16 20 81 3.1 -9 663.00 -56.2 -52.6 -54.3 65 -99 SPO 1997 10 30 16 21 81 3.1 -9 663.00 -56.2 -52.7 -54.3 65 -99 SPO 1997 10 30 16 22 82 3.0 -9 663.00 -56.2 -52.6 -54.3 64 -99 SPO 1997 10 30 16 23 84 3.1 -9 663.00 -56.2 -52.6 -54.2 65 -99 SPO 1997 10 30 16 24 84 3.1 -9 663.00 -56.2 -52.6 -54.0 64 -99 SPO 1997 10 30 16 25 83 3.0 -9 663.00 -56.3 -52.7 -54.0 65 -99 SPO 1997 10 30 16 26 83 3.0 -9 663.00 -56.3 -52.7 -54.0 64 -99 SPO 1997 10 30 16 27 84 3.1 -9 663.00 -56.3 -52.7 -54.0 64 -99 SPO 1997 10 30 16 28 83 3.1 -9 663.00 -56.3 -52.8 -54.0 64 -99 SPO 1997 10 30 16 29 83 3.1 -9 663.00 -56.3 -52.7 -54.0 64 -99 SPO 1997 10 30 16 30 83 3.1 -9 663.00 -56.4 -52.7 -54.0 64 -99 SPO 1997 10 30 16 31 83 3.1 -9 663.00 -56.4 -52.8 -53.9 64 -99 SPO 1997 10 30 16 32 84 3.0 -9 663.00 -56.4 -52.8 -53.8 64 -99 SPO 1997 10 30 16 33 85 3.0 -9 663.00 -56.4 -53.0 -53.7 64 -99 SPO 1997 10 30 16 34 88 3.0 -9 663.00 -56.4 -53.0 -53.7 64 -99 SPO 1997 10 30 16 35 88 3.0 -9 663.00 -56.4 -53.2 -53.8 64 -99 SPO 1997 10 30 16 36 88 3.0 -9 663.00 -56.4 -53.2 -54.0 64 -99 SPO 1997 10 30 16 37 89 2.9 -9 663.00 -56.4 -53.1 -54.2 64 -99 SPO 1997 10 30 16 38 91 2.9 -9 663.00 -56.3 -53.2 -54.3 63 -99 SPO 1997 10 30 16 39 89 2.9 -9 663.00 -56.4 -53.2 -54.6 64 -99 SPO 1997 10 30 16 40 87 2.8 -9 663.10 -56.5 -53.1 -54.5 64 -99 SPO 1997 10 30 16 41 86 2.9 -9 663.00 -56.4 -53.1 -54.6 64 -99 SPO 1997 10 30 16 42 86 3.0 -9 663.00 -56.4 -53.1 -54.5 64 -99 SPO 1997 10 30 16 43 86 2.9 -9 663.00 -56.4 -53.1 -54.4 63 -99 SPO 1997 10 30 16 44 86 2.9 -9 663.10 -56.3 -53.1 -54.4 62 -99 SPO 1997 10 30 16 45 86 2.9 -9 663.00 -56.3 -53.1 -54.3 62 -99 SPO 1997 10 30 16 46 85 3.0 -9 663.00 -56.3 -53.1 -54.3 63 -99 SPO 1997 10 30 16 47 84 3.0 -9 663.00 -56.3 -53.0 -54.2 62 -99 SPO 1997 10 30 16 48 82 3.1 -9 663.00 -56.4 -53.0 -54.0 63 -99 SPO 1997 10 30 16 49 82 3.1 -9 663.00 -56.4 -53.0 -53.8 63 -99 SPO 1997 10 30 16 50 83 3.1 -9 663.00 -56.4 -53.1 -53.8 63 -99 SPO 1997 10 30 16 51 82 3.0 -9 663.00 -56.4 -53.1 -53.9 63 -99 SPO 1997 10 30 16 52 82 3.0 -9 663.00 -56.4 -53.1 -53.9 64 -99 SPO 1997 10 30 16 53 84 3.0 -9 663.00 -56.3 -53.0 -53.8 63 -99 SPO 1997 10 30 16 54 83 3.0 -9 663.00 -56.4 -53.0 -53.8 64 -99 SPO 1997 10 30 16 55 82 3.0 -9 663.00 -56.4 -53.1 -53.9 64 -99 SPO 1997 10 30 16 56 82 3.2 -9 662.90 -56.4 -53.1 -53.8 64 -99 SPO 1997 10 30 16 57 81 3.2 -9 662.90 -56.4 -53.1 -53.7 64 -99 SPO 1997 10 30 16 58 81 3.2 -9 662.90 -56.4 -53.1 -53.7 64 -99 SPO 1997 10 30 16 59 81 3.2 -9 662.90 -56.4 -53.1 -53.6 64 -99 SPO 1997 10 30 17 00 81 3.3 -9 662.90 -56.4 -53.1 -53.7 63 0 SPO 1997 10 30 17 01 80 3.4 -9 662.90 -56.4 -53.1 -53.7 64 -99 SPO 1997 10 30 17 02 80 3.4 -9 662.90 -56.4 -53.1 -53.7 64 -99 SPO 1997 10 30 17 03 79 3.3 -9 662.90 -56.5 -53.1 -53.8 64 -99 SPO 1997 10 30 17 04 79 3.3 -9 662.90 -56.5 -53.1 -53.8 64 -99 SPO 1997 10 30 17 05 81 3.2 -9 662.90 -56.5 -53.1 -53.8 64 -99 SPO 1997 10 30 17 06 82 3.2 -9 662.90 -56.5 -53.1 -53.7 64 -99 SPO 1997 10 30 17 07 83 3.1 -9 662.90 -56.5 -53.1 -53.7 65 -99 SPO 1997 10 30 17 08 86 3.1 -9 662.90 -56.5 -53.1 -53.8 65 -99 SPO 1997 10 30 17 09 88 3.0 -9 662.90 -56.5 -53.1 -54.1 66 -99 SPO 1997 10 30 17 10 88 2.9 -9 662.90 -56.5 -53.2 -54.4 66 -99 SPO 1997 10 30 17 11 87 3.0 -9 662.90 -56.5 -53.2 -54.5 67 -99 SPO 1997 10 30 17 12 86 2.9 -9 662.90 -56.5 -53.2 -54.5 67 -99 SPO 1997 10 30 17 13 83 3.0 -9 662.90 -56.5 -53.2 -54.2 66 -99 SPO 1997 10 30 17 14 81 3.0 -9 662.90 -56.4 -53.1 -53.9 64 -99 SPO 1997 10 30 17 15 80 3.0 -9 662.90 -56.4 -53.0 -53.7 64 -99 SPO 1997 10 30 17 16 78 3.0 -9 662.90 -56.4 -53.0 -53.6 64 -99 SPO 1997 10 30 17 17 76 3.1 -9 662.90 -56.4 -53.0 -53.6 64 -99 SPO 1997 10 30 17 18 75 3.1 -9 662.90 -56.4 -53.1 -53.6 65 -99 SPO 1997 10 30 17 19 75 3.2 -9 662.90 -56.3 -53.1 -53.8 64 -99 SPO 1997 10 30 17 20 75 3.2 -9 662.90 -56.4 -53.1 -54.0 66 -99 SPO 1997 10 30 17 21 77 3.1 -9 662.90 -56.4 -53.0 -53.9 66 -99 SPO 1997 10 30 17 22 77 3.1 -9 662.90 -56.4 -53.0 -53.8 67 -99 SPO 1997 10 30 17 23 78 3.1 -9 662.90 -56.4 -53.0 -53.7 67 -99 SPO 1997 10 30 17 24 79 3.1 -9 662.90 -56.3 -53.0 -53.7 66 -99 SPO 1997 10 30 17 25 79 3.2 -9 662.90 -56.3 -53.0 -53.7 67 -99 SPO 1997 10 30 17 26 78 3.2 -9 662.90 -56.3 -53.0 -53.7 67 -99 SPO 1997 10 30 17 27 77 3.2 -9 662.90 -56.4 -53.0 -53.7 67 -99 SPO 1997 10 30 17 28 79 3.2 -9 662.90 -56.4 -53.0 -53.8 67 -99 SPO 1997 10 30 17 29 81 3.1 -9 662.90 -56.4 -53.0 -53.7 67 -99 SPO 1997 10 30 17 30 83 3.0 -9 662.90 -56.4 -53.0 -53.8 66 -99 SPO 1997 10 30 17 31 84 3.0 -9 662.90 -56.4 -53.0 -54.0 66 -99 SPO 1997 10 30 17 32 84 3.0 -9 662.90 -56.4 -52.9 -54.1 66 -99 SPO 1997 10 30 17 33 83 3.0 -9 662.90 -56.4 -52.9 -54.0 67 -99 SPO 1997 10 30 17 34 84 3.0 -9 662.90 -56.4 -52.8 -54.0 67 -99 SPO 1997 10 30 17 35 83 3.1 -9 662.90 -56.3 -52.8 -54.0 66 -99 SPO 1997 10 30 17 36 81 3.1 -9 662.90 -56.3 -52.8 -53.9 66 -99 SPO 1997 10 30 17 37 78 3.1 -9 662.90 -56.3 -52.8 -53.8 66 -99 SPO 1997 10 30 17 38 76 3.1 -9 662.90 -56.3 -52.8 -53.7 66 -99 SPO 1997 10 30 17 39 74 3.2 -9 662.90 -56.3 -52.9 -53.7 66 -99 SPO 1997 10 30 17 40 72 3.4 -9 662.90 -56.3 -52.9 -53.9 67 -99 SPO 1997 10 30 17 41 71 3.4 -9 662.90 -56.3 -52.9 -54.2 67 -99 SPO 1997 10 30 17 42 70 3.4 -9 662.90 -56.3 -52.9 -54.3 67 -99 SPO 1997 10 30 17 43 70 3.5 -9 662.90 -56.3 -52.8 -54.4 67 -99 SPO 1997 10 30 17 44 70 3.5 -9 662.90 -56.4 -52.8 -54.5 67 -99 SPO 1997 10 30 17 45 69 3.5 -9 662.90 -56.3 -52.8 -54.6 66 -99 SPO 1997 10 30 17 46 68 3.5 -9 662.90 -56.4 -52.8 -54.6 66 -99 SPO 1997 10 30 17 47 68 3.5 -9 662.90 -56.4 -52.8 -54.7 66 -99 SPO 1997 10 30 17 48 67 3.6 -9 662.90 -56.5 -52.8 -54.8 68 -99 SPO 1997 10 30 17 49 66 3.6 -9 662.90 -56.5 -52.8 -54.9 68 -99 SPO 1997 10 30 17 50 64 3.5 -9 662.90 -56.5 -52.8 -54.9 68 -99 SPO 1997 10 30 17 51 64 3.4 -9 662.90 -56.5 -52.7 -54.8 69 -99 SPO 1997 10 30 17 52 63 3.4 -9 662.90 -56.4 -52.7 -54.8 68 -99 SPO 1997 10 30 17 53 62 3.2 -9 662.90 -56.4 -52.7 -54.7 69 -99 SPO 1997 10 30 17 54 63 3.2 -9 662.90 -56.3 -52.7 -54.7 68 -99 SPO 1997 10 30 17 55 64 3.2 -9 662.90 -56.2 -52.7 -54.6 68 -99 SPO 1997 10 30 17 56 66 3.3 -9 662.90 -56.1 -52.7 -54.6 68 -99 SPO 1997 10 30 17 57 67 3.2 -9 662.90 -56.0 -52.7 -54.6 66 -99 SPO 1997 10 30 17 58 70 3.3 -9 662.90 -56.0 -52.7 -54.4 66 -99 SPO 1997 10 30 17 59 71 3.4 -9 662.90 -56.0 -52.8 -54.4 66 -99 SPO 1997 10 30 18 00 72 3.4 -9 662.90 -55.9 -52.8 -54.3 65 0 SPO 1997 10 30 18 01 73 3.5 -9 662.90 -56.0 -52.8 -54.4 67 -99 SPO 1997 10 30 18 02 72 3.6 -9 662.90 -56.0 -52.8 -54.5 67 -99 SPO 1997 10 30 18 03 72 3.6 -9 662.90 -56.1 -52.9 -54.6 68 -99 SPO 1997 10 30 18 04 73 3.5 -9 662.90 -56.1 -52.8 -54.5 68 -99 SPO 1997 10 30 18 05 73 3.5 -9 662.90 -56.1 -52.9 -54.5 68 -99 SPO 1997 10 30 18 06 72 3.5 -9 662.90 -56.0 -52.9 -54.6 67 -99 SPO 1997 10 30 18 07 71 3.6 -9 662.90 -56.0 -52.9 -54.6 66 -99 SPO 1997 10 30 18 08 71 3.7 -9 662.90 -56.0 -52.8 -54.7 66 -99 SPO 1997 10 30 18 09 71 3.8 -9 662.90 -56.0 -52.8 -54.7 66 -99 SPO 1997 10 30 18 10 72 3.8 -9 662.90 -56.0 -52.8 -54.7 66 -99 SPO 1997 10 30 18 11 72 3.7 -9 662.90 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 12 73 3.8 -9 662.90 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 13 73 3.7 -9 662.80 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 14 74 3.7 -9 662.80 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 15 73 3.6 -9 662.90 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 16 73 3.6 -9 662.90 -56.0 -52.8 -54.7 65 -99 SPO 1997 10 30 18 17 74 3.4 -9 662.90 -56.0 -52.9 -54.7 65 -99 SPO 1997 10 30 18 18 75 3.4 -9 662.90 -56.0 -52.9 -54.5 66 -99 SPO 1997 10 30 18 19 76 3.4 -9 662.90 -55.9 -52.9 -54.3 66 -99 SPO 1997 10 30 18 20 75 3.4 -9 662.90 -55.9 -53.0 -54.2 66 -99 SPO 1997 10 30 18 21 73 3.4 -9 662.90 -56.0 -53.0 -54.4 67 -99 SPO 1997 10 30 18 22 73 3.5 -9 662.90 -56.0 -52.9 -54.5 67 -99 SPO 1997 10 30 18 23 72 3.6 -9 662.90 -56.0 -52.9 -54.6 67 -99 SPO 1997 10 30 18 24 71 3.7 -9 662.90 -56.1 -52.9 -54.8 68 -99 SPO 1997 10 30 18 25 70 3.8 -9 662.90 -56.1 -52.9 -54.8 68 -99 SPO 1997 10 30 18 26 69 3.8 -9 662.90 -56.0 -52.9 -54.9 67 -99 SPO 1997 10 30 18 27 70 3.8 -9 662.90 -56.0 -52.9 -54.8 67 -99 SPO 1997 10 30 18 28 69 3.7 -9 662.90 -56.0 -52.9 -54.8 66 -99 SPO 1997 10 30 18 29 70 3.6 -9 662.90 -56.0 -52.9 -54.7 66 -99 SPO 1997 10 30 18 30 73 3.6 -9 662.80 -56.0 -53.0 -54.6 66 -99 SPO 1997 10 30 18 31 72 3.5 -9 662.80 -56.0 -53.0 -54.4 66 -99 SPO 1997 10 30 18 32 73 3.5 -9 662.80 -56.0 -53.0 -54.4 67 -99 SPO 1997 10 30 18 33 73 3.4 -9 662.80 -55.9 -53.0 -54.3 66 -99 SPO 1997 10 30 18 34 75 3.5 -9 662.80 -55.9 -53.0 -54.2 66 -99 SPO 1997 10 30 18 35 74 3.5 -9 662.80 -55.9 -53.0 -54.2 66 -99 SPO 1997 10 30 18 36 74 3.5 -9 662.80 -55.9 -53.0 -54.2 66 -99 SPO 1997 10 30 18 37 74 3.6 -9 662.80 -55.9 -53.0 -54.3 66 -99 SPO 1997 10 30 18 38 75 3.7 -9 662.80 -55.9 -53.1 -54.2 67 -99 SPO 1997 10 30 18 39 75 3.6 -9 662.80 -55.9 -53.2 -54.3 67 -99 SPO 1997 10 30 18 40 75 3.6 -9 662.80 -55.8 -53.2 -54.4 66 -99 SPO 1997 10 30 18 41 75 3.6 -9 662.80 -55.9 -53.2 -54.4 67 -99 SPO 1997 10 30 18 42 74 3.7 -9 662.80 -55.9 -53.2 -54.4 66 -99 SPO 1997 10 30 18 43 75 3.6 -9 662.80 -55.9 -53.1 -54.4 66 -99 SPO 1997 10 30 18 44 75 3.5 -9 662.80 -55.9 -53.1 -54.3 67 -99 SPO 1997 10 30 18 45 75 3.5 -9 662.80 -55.9 -53.1 -54.2 67 -99 SPO 1997 10 30 18 46 75 3.5 -9 662.80 -55.8 -53.1 -54.2 66 -99 SPO 1997 10 30 18 47 74 3.5 -9 662.80 -55.7 -53.2 -54.2 65 -99 SPO 1997 10 30 18 48 73 3.5 -9 662.80 -55.7 -53.3 -54.4 66 -99 SPO 1997 10 30 18 49 73 3.6 -9 662.80 -55.8 -53.3 -54.4 67 -99 SPO 1997 10 30 18 50 72 3.6 -9 662.80 -55.8 -53.3 -54.5 67 -99 SPO 1997 10 30 18 51 71 3.6 -9 662.80 -55.8 -53.3 -54.6 67 -99 SPO 1997 10 30 18 52 70 3.6 -9 662.80 -55.8 -53.2 -54.6 67 -99 SPO 1997 10 30 18 53 70 3.6 -9 662.80 -55.8 -53.2 -54.7 68 -99 SPO 1997 10 30 18 54 70 3.5 -9 662.80 -55.8 -53.2 -54.7 68 -99 SPO 1997 10 30 18 55 72 3.4 -9 662.80 -55.7 -53.3 -54.6 66 -99 SPO 1997 10 30 18 56 75 3.2 -9 662.80 -55.7 -53.3 -54.5 65 -99 SPO 1997 10 30 18 57 78 3.0 -9 662.80 -55.7 -53.3 -54.3 65 -99 SPO 1997 10 30 18 58 81 2.9 -9 662.80 -55.7 -53.3 -54.0 65 -99 SPO 1997 10 30 18 59 82 2.9 -9 662.80 -55.8 -53.4 -53.8 65 -99 SPO 1997 10 30 19 00 82 2.9 -9 662.80 -55.8 -53.4 -53.8 66 0 SPO 1997 10 30 19 01 81 3.0 -9 662.80 -55.9 -53.4 -54.0 66 -99 SPO 1997 10 30 19 02 81 2.9 -9 662.80 -56.0 -53.4 -54.0 67 -99 SPO 1997 10 30 19 03 82 2.9 -9 662.80 -56.0 -53.4 -54.1 67 -99 SPO 1997 10 30 19 04 84 2.8 -9 662.80 -56.0 -53.4 -54.0 67 -99 SPO 1997 10 30 19 05 86 2.8 -9 662.80 -56.0 -53.4 -53.9 67 -99 SPO 1997 10 30 19 06 86 2.6 -9 662.80 -56.0 -53.3 -53.8 67 -99 SPO 1997 10 30 19 07 86 2.6 -9 662.80 -56.1 -53.4 -53.8 67 -99 SPO 1997 10 30 19 08 84 2.6 -9 662.80 -56.1 -53.4 -53.8 66 -99 SPO 1997 10 30 19 09 83 2.6 -9 662.80 -56.2 -53.4 -53.7 66 -99 SPO 1997 10 30 19 10 82 2.6 -9 662.80 -56.3 -53.3 -53.8 66 -99 SPO 1997 10 30 19 11 81 2.7 -9 662.70 -56.3 -53.3 -53.8 65 -99 SPO 1997 10 30 19 12 80 2.8 -9 662.70 -56.4 -53.3 -53.9 65 -99 SPO 1997 10 30 19 13 79 2.8 -9 662.70 -56.4 -53.3 -54.0 66 -99 SPO 1997 10 30 19 14 78 2.9 -9 662.70 -56.4 -53.3 -54.2 66 -99 SPO 1997 10 30 19 15 76 2.9 -9 662.70 -56.4 -53.3 -54.4 66 -99 SPO 1997 10 30 19 16 76 3.0 -9 662.70 -56.4 -53.2 -54.6 66 -99 SPO 1997 10 30 19 17 77 3.0 -9 662.70 -56.4 -53.2 -54.6 65 -99 SPO 1997 10 30 19 18 78 3.0 -9 662.70 -56.4 -53.3 -54.6 65 -99 SPO 1997 10 30 19 19 77 2.9 -9 662.70 -56.4 -53.4 -54.4 65 -99 SPO 1997 10 30 19 20 79 2.8 -9 662.70 -56.5 -53.4 -54.4 66 -99 SPO 1997 10 30 19 21 81 2.7 -9 662.70 -56.5 -53.4 -54.3 65 -99 SPO 1997 10 30 19 22 80 2.7 -9 662.70 -56.5 -53.4 -54.2 65 -99 SPO 1997 10 30 19 23 80 2.7 -9 662.70 -56.5 -53.4 -54.2 65 -99 SPO 1997 10 30 19 24 80 2.7 -9 662.70 -56.5 -53.4 -54.2 64 -99 SPO 1997 10 30 19 25 79 2.8 -9 662.70 -56.6 -53.4 -54.2 65 -99 SPO 1997 10 30 19 26 78 2.8 -9 662.70 -56.6 -53.4 -54.4 65 -99 SPO 1997 10 30 19 27 78 2.9 -9 662.70 -56.6 -53.4 -54.6 64 -99 SPO 1997 10 30 19 28 77 2.9 -9 662.70 -56.6 -53.4 -54.7 65 -99 SPO 1997 10 30 19 29 76 3.1 -9 662.70 -56.5 -53.5 -54.7 64 -99 SPO 1997 10 30 19 30 74 3.2 -9 662.70 -56.6 -53.5 -55.0 65 -99 SPO 1997 10 30 19 31 73 3.2 -9 662.70 -56.6 -53.4 -55.1 65 -99 SPO 1997 10 30 19 32 74 3.2 -9 662.70 -56.5 -53.4 -55.1 64 -99 SPO 1997 10 30 19 33 76 3.1 -9 662.70 -56.4 -53.4 -54.9 64 -99 SPO 1997 10 30 19 34 77 3.0 -9 662.70 -56.4 -53.4 -54.6 64 -99 SPO 1997 10 30 19 35 79 3.1 -9 662.70 -56.4 -53.4 -54.3 65 -99 SPO 1997 10 30 19 36 80 3.1 -9 662.70 -56.4 -53.3 -54.2 65 -99 SPO 1997 10 30 19 37 81 3.1 -9 662.70 -56.4 -53.2 -54.2 65 -99 SPO 1997 10 30 19 38 83 3.1 -9 662.70 -56.3 -53.1 -54.2 64 -99 SPO 1997 10 30 19 39 84 3.0 -9 662.70 -56.3 -53.1 -54.1 64 -99 SPO 1997 10 30 19 40 85 3.0 -9 662.70 -56.3 -53.2 -54.0 64 -99 SPO 1997 10 30 19 41 86 3.0 -9 662.70 -56.3 -53.2 -54.0 64 -99 SPO 1997 10 30 19 42 86 3.1 -9 662.70 -56.2 -53.2 -54.0 63 -99 SPO 1997 10 30 19 43 86 3.2 -9 662.70 -56.2 -53.2 -54.0 64 -99 SPO 1997 10 30 19 44 85 3.2 -9 662.70 -56.2 -53.2 -54.1 64 -99 SPO 1997 10 30 19 45 85 3.2 -9 662.70 -56.1 -53.2 -54.1 64 -99 SPO 1997 10 30 19 46 84 3.2 -9 662.70 -56.1 -53.2 -54.2 64 -99 SPO 1997 10 30 19 47 82 3.4 -9 662.70 -56.1 -53.2 -54.2 65 -99 SPO 1997 10 30 19 48 80 3.4 -9 662.60 -56.1 -53.1 -54.3 66 -99 SPO 1997 10 30 19 49 79 3.6 -9 662.60 -56.2 -53.0 -54.4 67 -99 SPO 1997 10 30 19 50 76 3.6 -9 662.60 -56.2 -52.9 -54.6 67 -99 SPO 1997 10 30 19 51 75 3.6 -9 662.60 -56.2 -52.9 -54.7 68 -99 SPO 1997 10 30 19 52 74 3.6 -9 662.60 -56.1 -52.9 -54.8 67 -99 SPO 1997 10 30 19 53 74 3.6 -9 662.60 -56.0 -52.9 -54.7 66 -99 SPO 1997 10 30 19 54 75 3.6 -9 662.60 -56.0 -52.8 -54.6 66 -99 SPO 1997 10 30 19 55 76 3.5 -9 662.60 -56.0 -52.8 -54.5 66 -99 SPO 1997 10 30 19 56 77 3.5 -9 662.60 -56.0 -52.8 -54.3 66 -99 SPO 1997 10 30 19 57 77 3.5 -9 662.60 -55.9 -52.8 -54.2 66 -99 SPO 1997 10 30 19 58 77 3.5 -9 662.60 -55.9 -52.8 -54.0 66 -99 SPO 1997 10 30 19 59 76 3.6 -9 662.60 -55.9 -52.7 -54.1 66 -99 SPO 1997 10 30 20 00 74 3.6 -9 662.60 -55.9 -52.6 -54.1 67 0 SPO 1997 10 30 20 01 72 3.6 -9 662.60 -55.8 -52.6 -54.3 67 -99 SPO 1997 10 30 20 02 72 3.6 -9 662.60 -55.8 -52.7 -54.4 68 -99 SPO 1997 10 30 20 03 72 3.7 -9 662.60 -55.8 -52.4 -54.4 69 -99 SPO 1997 10 30 20 04 71 3.6 -9 662.50 -55.8 -52.2 -54.4 69 -99 SPO 1997 10 30 20 05 70 3.7 -9 662.50 -55.8 -52.0 -54.4 69 -99 SPO 1997 10 30 20 06 70 3.7 -9 662.50 -55.8 -52.0 -54.6 70 -99 SPO 1997 10 30 20 07 69 3.8 -9 662.50 -55.9 -52.0 -54.6 69 -99 SPO 1997 10 30 20 08 70 3.8 -9 662.50 -55.8 -52.0 -54.6 69 -99 SPO 1997 10 30 20 09 70 3.7 -9 662.50 -55.7 -51.9 -54.6 66 -99 SPO 1997 10 30 20 10 70 3.6 -9 662.50 -55.8 -52.1 -54.6 67 -99 SPO 1997 10 30 20 11 72 3.7 -9 662.50 -55.8 -52.0 -54.6 67 -99 SPO 1997 10 30 20 12 74 3.7 -9 662.40 -55.8 -51.8 -54.4 67 -99 SPO 1997 10 30 20 13 76 3.6 -9 662.40 -55.8 -51.6 -54.2 68 -99 SPO 1997 10 30 20 14 77 3.5 -9 662.40 -55.8 -51.5 -54.1 68 -99 SPO 1997 10 30 20 15 76 3.6 -9 662.40 -55.8 -51.8 -54.0 68 -99 SPO 1997 10 30 20 16 76 3.6 -9 662.40 -55.8 -51.9 -54.2 68 -99 SPO 1997 10 30 20 17 76 3.6 -9 662.40 -55.8 -51.8 -54.2 68 -99 SPO 1997 10 30 20 18 76 3.7 -9 662.40 -55.9 -51.7 -54.2 69 -99 SPO 1997 10 30 20 19 76 3.7 -9 662.40 -55.9 -51.7 -54.2 69 -99 SPO 1997 10 30 20 20 75 3.7 -9 662.40 -56.0 -51.9 -54.3 69 -99 SPO 1997 10 30 20 21 76 3.6 -9 662.40 -56.0 -52.2 -54.3 69 -99 SPO 1997 10 30 20 22 77 3.5 -9 662.40 -56.0 -52.4 -54.2 69 -99 SPO 1997 10 30 20 23 77 3.6 -9 662.40 -56.0 -52.8 -54.2 69 -99 SPO 1997 10 30 20 24 78 3.6 -9 662.50 -56.2 -52.9 -54.1 69 -99 SPO 1997 10 30 20 25 78 3.6 -9 662.40 -56.2 -52.9 -54.2 69 -99 SPO 1997 10 30 20 26 78 3.6 -9 662.40 -56.2 -53.0 -54.2 69 -99 SPO 1997 10 30 20 27 77 3.8 -9 662.40 -56.2 -53.1 -54.4 69 -99 SPO 1997 10 30 20 28 76 3.8 -9 662.40 -56.3 -53.0 -54.5 69 -99 SPO 1997 10 30 20 29 75 3.8 -9 662.40 -56.3 -53.0 -54.6 69 -99 SPO 1997 10 30 20 30 75 3.8 -9 662.40 -56.3 -53.0 -54.7 69 -99 SPO 1997 10 30 20 31 75 3.8 -9 662.40 -56.4 -53.0 -54.8 69 -99 SPO 1997 10 30 20 32 74 3.9 -9 662.40 -56.4 -53.0 -54.8 69 -99 SPO 1997 10 30 20 33 74 3.9 -9 662.40 -56.4 -53.0 -54.9 69 -99 SPO 1997 10 30 20 34 75 3.9 -9 662.40 -56.4 -52.8 -54.9 68 -99 SPO 1997 10 30 20 35 75 3.9 -9 662.50 -56.5 -52.9 -55.0 69 -99 SPO 1997 10 30 20 36 75 3.8 -9 662.50 -56.5 -52.9 -55.0 68 -99 SPO 1997 10 30 20 37 75 3.8 -9 662.50 -56.5 -52.9 -55.0 67 -99 SPO 1997 10 30 20 38 75 3.7 -9 662.50 -56.4 -53.0 -54.9 65 -99 SPO 1997 10 30 20 39 75 3.5 -9 662.50 -56.4 -53.0 -54.8 65 -99 SPO 1997 10 30 20 40 76 3.5 -9 662.50 -56.5 -53.2 -54.8 66 -99 SPO 1997 10 30 20 41 77 3.4 -9 662.50 -56.5 -53.2 -54.6 68 -99 SPO 1997 10 30 20 42 77 3.5 -9 662.50 -56.5 -53.2 -54.6 68 -99 SPO 1997 10 30 20 43 76 3.6 -9 662.50 -56.5 -53.2 -54.6 68 -99 SPO 1997 10 30 20 44 75 3.6 -9 662.50 -56.5 -53.3 -54.8 68 -99 SPO 1997 10 30 20 45 72 3.6 -9 662.50 -56.5 -53.2 -55.0 68 -99 SPO 1997 10 30 20 46 72 3.9 -9 662.50 -56.5 -53.1 -55.1 68 -99 SPO 1997 10 30 20 47 71 3.9 -9 662.50 -56.5 -52.9 -55.2 68 -99 SPO 1997 10 30 20 48 71 4.0 -9 662.50 -56.5 -52.9 -55.2 68 -99 SPO 1997 10 30 20 49 71 4.0 -9 662.50 -56.5 -52.9 -55.2 68 -99 SPO 1997 10 30 20 50 71 4.0 -9 662.50 -56.5 -52.9 -55.2 67 -99 SPO 1997 10 30 20 51 72 3.9 -9 662.50 -56.5 -53.0 -55.2 67 -99 SPO 1997 10 30 20 52 73 3.9 -9 662.50 -56.5 -53.0 -55.0 67 -99 SPO 1997 10 30 20 53 73 4.0 -9 662.50 -56.4 -53.0 -55.0 66 -99 SPO 1997 10 30 20 54 72 4.0 -9 662.50 -56.4 -53.0 -55.0 67 -99 SPO 1997 10 30 20 55 71 4.1 -9 662.40 -56.4 -53.0 -55.1 68 -99 SPO 1997 10 30 20 56 71 4.1 -9 662.40 -56.4 -53.0 -55.2 69 -99 SPO 1997 10 30 20 57 72 4.0 -9 662.40 -56.3 -53.0 -55.2 68 -99 SPO 1997 10 30 20 58 73 4.0 -9 662.40 -56.3 -53.1 -55.0 68 -99 SPO 1997 10 30 20 59 73 3.9 -9 662.50 -56.3 -53.2 -54.9 69 -99 SPO 1997 10 30 21 00 74 3.8 -9 662.50 -56.3 -53.2 -54.8 69 0 SPO 1997 10 30 21 01 74 3.7 -9 662.50 -56.3 -53.2 -54.7 69 -99 SPO 1997 10 30 21 02 75 3.7 -9 662.50 -56.2 -53.2 -54.6 69 -99 SPO 1997 10 30 21 03 75 3.7 -9 662.50 -56.3 -53.2 -54.6 69 -99 SPO 1997 10 30 21 04 76 3.7 -9 662.40 -56.3 -53.2 -54.5 69 -99 SPO 1997 10 30 21 05 77 3.7 -9 662.40 -56.3 -53.2 -54.5 69 -99 SPO 1997 10 30 21 06 77 3.7 -9 662.40 -56.4 -53.2 -54.4 69 -99 SPO 1997 10 30 21 07 77 3.6 -9 662.40 -56.4 -53.3 -54.4 69 -99 SPO 1997 10 30 21 08 78 3.6 -9 662.40 -56.4 -53.4 -54.4 68 -99 SPO 1997 10 30 21 09 79 3.5 -9 662.40 -56.5 -53.4 -54.4 69 -99 SPO 1997 10 30 21 10 79 3.5 -9 662.40 -56.5 -53.4 -54.3 69 -99 SPO 1997 10 30 21 11 80 3.5 -9 662.40 -56.5 -53.4 -54.3 68 -99 SPO 1997 10 30 21 12 81 3.5 -9 662.40 -56.5 -53.4 -54.3 68 -99 SPO 1997 10 30 21 13 82 3.4 -9 662.40 -56.6 -53.4 -54.2 68 -99 SPO 1997 10 30 21 14 81 3.4 -9 662.40 -56.7 -53.5 -54.2 69 -99 SPO 1997 10 30 21 15 80 3.5 -9 662.40 -56.7 -53.4 -54.3 69 -99 SPO 1997 10 30 21 16 79 3.5 -9 662.40 -56.7 -53.3 -54.4 68 -99 SPO 1997 10 30 21 17 80 3.5 -9 662.40 -56.7 -53.3 -54.4 68 -99 SPO 1997 10 30 21 18 81 3.5 -9 662.40 -56.7 -53.2 -54.4 68 -99 SPO 1997 10 30 21 19 82 3.5 -9 662.40 -56.7 -53.3 -54.4 67 -99 SPO 1997 10 30 21 20 83 3.5 -9 662.40 -56.7 -53.4 -54.4 67 -99 SPO 1997 10 30 21 21 84 3.4 -9 662.40 -56.6 -53.4 -54.4 66 -99 SPO 1997 10 30 21 22 86 3.4 -9 662.40 -56.7 -53.5 -54.4 68 -99 SPO 1997 10 30 21 23 87 3.5 -9 662.40 -56.6 -53.5 -54.4 67 -99 SPO 1997 10 30 21 24 88 3.4 -9 662.40 -56.6 -53.5 -54.5 68 -99 SPO 1997 10 30 21 25 88 3.4 -9 662.40 -56.7 -53.5 -54.5 68 -99 SPO 1997 10 30 21 26 88 3.4 -9 662.40 -56.7 -53.6 -54.6 68 -99 SPO 1997 10 30 21 27 88 3.4 -9 662.40 -56.7 -53.6 -54.6 68 -99 SPO 1997 10 30 21 28 87 3.4 -9 662.30 -56.7 -53.5 -54.6 68 -99 SPO 1997 10 30 21 29 85 3.4 -9 662.30 -56.8 -53.5 -54.6 69 -99 SPO 1997 10 30 21 30 85 3.4 -9 662.30 -56.7 -53.5 -54.6 69 -99 SPO 1997 10 30 21 31 84 3.4 -9 662.30 -56.7 -53.5 -54.7 68 -99 SPO 1997 10 30 21 32 85 3.4 -9 662.30 -56.7 -53.4 -54.8 68 -99 SPO 1997 10 30 21 33 86 3.4 -9 662.30 -56.8 -53.5 -54.8 68 -99 SPO 1997 10 30 21 34 87 3.5 -9 662.30 -56.8 -53.5 -54.8 68 -99 SPO 1997 10 30 21 35 86 3.5 -9 662.30 -56.8 -53.5 -54.8 67 -99 SPO 1997 10 30 21 36 84 3.6 -9 662.30 -56.9 -53.5 -54.9 68 -99 SPO 1997 10 30 21 37 82 3.5 -9 662.30 -56.9 -53.6 -55.0 68 -99 SPO 1997 10 30 21 38 82 3.4 -9 662.30 -56.9 -53.6 -54.9 68 -99 SPO 1997 10 30 21 39 82 3.5 -9 662.30 -56.9 -53.7 -54.9 69 -99 SPO 1997 10 30 21 40 80 3.4 -9 662.30 -56.9 -53.6 -54.9 69 -99 SPO 1997 10 30 21 41 82 3.2 -9 662.30 -56.9 -53.6 -54.8 69 -99 SPO 1997 10 30 21 42 85 3.1 -9 662.30 -56.9 -53.7 -54.8 69 -99 SPO 1997 10 30 21 43 88 2.9 -9 662.30 -56.9 -53.8 -54.7 69 -99 SPO 1997 10 30 21 44 88 2.9 -9 662.30 -57.0 -53.8 -54.6 70 -99 SPO 1997 10 30 21 45 88 2.7 -9 662.30 -57.1 -53.9 -54.5 71 -99 SPO 1997 10 30 21 46 87 2.6 -9 662.30 -57.2 -53.9 -54.2 71 -99 SPO 1997 10 30 21 47 85 2.7 -9 662.30 -57.2 -54.0 -54.5 72 -99 SPO 1997 10 30 21 48 83 2.8 -9 662.30 -57.2 -54.0 -55.0 72 -99 SPO 1997 10 30 21 49 81 2.8 -9 662.30 -57.1 -53.9 -55.2 72 -99 SPO 1997 10 30 21 50 80 2.9 -9 662.30 -57.0 -53.8 -55.2 71 -99 SPO 1997 10 30 21 51 80 3.0 -9 662.30 -56.9 -53.7 -55.0 71 -99 SPO 1997 10 30 21 52 80 3.1 -9 662.30 -56.9 -53.7 -54.9 71 -99 SPO 1997 10 30 21 53 80 3.1 -9 662.30 -57.0 -53.7 -54.8 71 -99 SPO 1997 10 30 21 54 80 3.1 -9 662.30 -57.0 -53.8 -54.9 70 -99 SPO 1997 10 30 21 55 81 3.0 -9 662.30 -57.0 -53.8 -55.0 70 -99 SPO 1997 10 30 21 56 81 2.9 -9 662.30 -57.1 -54.0 -55.0 70 -99 SPO 1997 10 30 21 57 82 2.7 -9 662.30 -57.2 -54.0 -55.0 71 -99 SPO 1997 10 30 21 58 82 2.4 -9 662.30 -57.2 -54.1 -54.9 71 -99 SPO 1997 10 30 21 59 81 2.3 -9 662.30 -57.2 -54.2 -54.9 71 -99 SPO 1997 10 30 22 00 80 2.5 -9 662.30 -57.1 -54.2 -55.0 70 0 SPO 1997 10 30 22 01 80 2.5 -9 662.30 -57.1 -54.2 -55.0 69 -99 SPO 1997 10 30 22 02 80 2.5 -9 662.30 -57.2 -54.2 -55.0 70 -99 SPO 1997 10 30 22 03 79 2.6 -9 662.30 -57.2 -54.1 -54.8 70 -99 SPO 1997 10 30 22 04 80 2.7 -9 662.30 -57.1 -54.0 -54.6 69 -99 SPO 1997 10 30 22 05 80 2.6 -9 662.30 -57.1 -54.0 -54.4 70 -99 SPO 1997 10 30 22 06 80 2.4 -9 662.30 -57.1 -54.1 -54.1 70 -99 SPO 1997 10 30 22 07 81 2.3 -9 662.30 -57.2 -54.1 -53.8 72 -99 SPO 1997 10 30 22 08 80 2.4 -9 662.30 -57.1 -54.1 -53.6 71 -99 SPO 1997 10 30 22 09 79 2.5 -9 662.30 -57.1 -54.1 -53.7 71 -99 SPO 1997 10 30 22 10 77 2.4 -9 662.30 -57.1 -54.1 -53.8 72 -99 SPO 1997 10 30 22 11 77 2.5 -9 662.30 -57.0 -54.0 -53.6 72 -99 SPO 1997 10 30 22 12 77 2.7 -9 662.30 -56.9 -54.0 -53.6 70 -99 SPO 1997 10 30 22 13 77 2.9 -9 662.30 -56.8 -53.8 -53.7 69 -99 SPO 1997 10 30 22 14 77 3.0 -9 662.30 -56.8 -53.7 -53.8 69 -99 SPO 1997 10 30 22 15 75 3.1 -9 662.30 -56.8 -53.5 -54.0 69 -99 SPO 1997 10 30 22 16 72 3.2 -9 662.30 -56.8 -53.6 -54.1 69 -99 SPO 1997 10 30 22 17 72 3.3 -9 662.30 -56.8 -53.6 -54.1 69 -99 SPO 1997 10 30 22 18 72 3.3 -9 662.30 -56.9 -53.6 -54.2 70 -99 SPO 1997 10 30 22 19 71 3.4 -9 662.30 -57.0 -53.6 -54.3 70 -99 SPO 1997 10 30 22 20 72 3.5 -9 662.30 -56.9 -53.4 -54.4 68 -99 SPO 1997 10 30 22 21 73 3.6 -9 662.30 -56.9 -53.3 -54.4 69 -99 SPO 1997 10 30 22 22 73 3.6 -9 662.30 -56.9 -53.3 -54.5 69 -99 SPO 1997 10 30 22 23 72 3.5 -9 662.30 -57.0 -53.4 -54.6 69 -99 SPO 1997 10 30 22 24 72 3.5 -9 662.30 -57.1 -53.4 -54.8 70 -99 SPO 1997 10 30 22 25 72 3.5 -9 662.30 -57.1 -53.5 -54.8 69 -99 SPO 1997 10 30 22 26 74 3.4 -9 662.30 -57.1 -53.4 -54.8 69 -99 SPO 1997 10 30 22 27 77 3.2 -9 662.30 -57.0 -53.4 -54.8 68 -99 SPO 1997 10 30 22 28 80 3.1 -9 662.30 -57.0 -53.5 -54.8 68 -99 SPO 1997 10 30 22 29 82 3.1 -9 662.30 -57.0 -53.6 -54.8 68 -99 SPO 1997 10 30 22 30 82 3.2 -9 662.30 -57.0 -53.6 -55.0 68 -99 SPO 1997 10 30 22 31 82 3.1 -9 662.30 -57.1 -53.6 -55.0 69 -99 SPO 1997 10 30 22 32 81 3.2 -9 662.30 -57.2 -53.6 -55.1 69 -99 SPO 1997 10 30 22 33 81 3.3 -9 662.30 -57.2 -53.6 -55.0 68 -99 SPO 1997 10 30 22 34 80 3.4 -9 662.30 -57.1 -53.6 -55.0 67 -99 SPO 1997 10 30 22 35 80 3.4 -9 662.30 -57.0 -53.6 -55.0 66 -99 SPO 1997 10 30 22 36 80 3.4 -9 662.30 -57.0 -53.7 -55.1 66 -99 SPO 1997 10 30 22 37 81 3.3 -9 662.30 -57.0 -53.7 -55.1 67 -99 SPO 1997 10 30 22 38 81 3.0 -9 662.30 -57.1 -53.7 -55.2 68 -99 SPO 1997 10 30 22 39 83 2.8 -9 662.20 -57.2 -53.9 -55.2 68 -99 SPO 1997 10 30 22 40 84 2.4 -9 662.20 -57.2 -54.0 -55.1 68 -99 SPO 1997 10 30 22 41 84 2.3 -9 662.30 -57.3 -54.2 -54.9 70 -99 SPO 1997 10 30 22 42 82 2.4 -9 662.30 -57.2 -54.2 -54.8 70 -99 SPO 1997 10 30 22 43 82 2.8 -9 662.30 -57.1 -54.2 -54.8 71 -99 SPO 1997 10 30 22 44 82 3.2 -9 662.30 -57.1 -54.1 -54.9 71 -99 SPO 1997 10 30 22 45 84 3.3 -9 662.20 -57.0 -54.0 -55.0 70 -99 SPO 1997 10 30 22 46 85 3.3 -9 662.20 -57.0 -53.9 -55.1 70 -99 SPO 1997 10 30 22 47 84 3.2 -9 662.20 -57.0 -54.0 -55.1 70 -99 SPO 1997 10 30 22 48 84 3.1 -9 662.20 -57.2 -54.0 -55.1 70 -99 SPO 1997 10 30 22 49 83 3.0 -9 662.20 -57.2 -54.1 -55.1 68 -99 SPO 1997 10 30 22 50 82 3.0 -9 662.20 -57.2 -54.1 -55.0 68 -99 SPO 1997 10 30 22 51 81 2.8 -9 662.20 -57.2 -54.1 -55.0 67 -99 SPO 1997 10 30 22 52 78 2.4 -9 662.20 -57.3 -54.2 -55.0 68 -99 SPO 1997 10 30 22 53 77 2.3 -9 662.20 -57.3 -54.3 -54.9 70 -99 SPO 1997 10 30 22 54 77 2.2 -9 662.20 -57.2 -54.3 -54.8 72 -99 SPO 1997 10 30 22 55 79 2.6 -9 662.20 -57.2 -54.3 -54.6 74 -99 SPO 1997 10 30 22 56 79 2.8 -9 662.20 -57.1 -54.2 -54.4 73 -99 SPO 1997 10 30 22 57 79 2.9 -9 662.20 -57.1 -54.2 -54.4 73 -99 SPO 1997 10 30 22 58 79 2.9 -9 662.20 -57.1 -54.2 -54.4 72 -99 SPO 1997 10 30 22 59 78 2.9 -9 662.30 -57.1 -54.2 -54.4 72 -99 SPO 1997 10 30 23 00 76 3.0 -9 662.30 -57.1 -54.2 -54.5 70 0 SPO 1997 10 30 23 01 75 2.7 -9 662.30 -57.2 -54.2 -54.8 70 -99 SPO 1997 10 30 23 02 74 2.5 -9 662.30 -57.3 -54.3 -55.2 71 -99 SPO 1997 10 30 23 03 73 2.6 -9 662.30 -57.3 -54.3 -55.4 71 -99 SPO 1997 10 30 23 04 74 2.5 -9 662.30 -57.4 -54.3 -55.3 72 -99 SPO 1997 10 30 23 05 74 2.5 -9 662.30 -57.3 -54.3 -55.3 71 -99 SPO 1997 10 30 23 06 73 2.6 -9 662.30 -57.3 -54.3 -55.4 71 -99 SPO 1997 10 30 23 07 72 2.7 -9 662.30 -57.3 -54.2 -55.4 70 -99 SPO 1997 10 30 23 08 70 2.7 -9 662.30 -57.2 -54.1 -55.4 69 -99 SPO 1997 10 30 23 09 69 2.8 -9 662.30 -57.2 -54.2 -55.4 69 -99 SPO 1997 10 30 23 10 69 2.6 -9 662.30 -57.2 -54.3 -55.4 70 -99 SPO 1997 10 30 23 11 70 2.6 -9 662.30 -57.2 -54.3 -55.3 71 -99 SPO 1997 10 30 23 12 70 2.7 -9 662.30 -57.2 -54.2 -55.2 71 -99 SPO 1997 10 30 23 13 69 2.8 -9 662.30 -57.2 -54.1 -55.3 72 -99 SPO 1997 10 30 23 14 69 3.0 -9 662.20 -57.0 -53.7 -55.2 70 -99 SPO 1997 10 30 23 15 71 3.0 -9 662.20 -57.0 -53.4 -55.0 70 -99 SPO 1997 10 30 23 16 71 2.8 -9 662.30 -57.0 -53.6 -54.8 70 -99 SPO 1997 10 30 23 17 72 2.2 -9 662.30 -57.1 -54.1 -54.8 71 -99 SPO 1997 10 30 23 18 72 1.9 -9 662.30 -57.2 -54.4 -54.8 72 -99 SPO 1997 10 30 23 19 63 1.4 -9 662.30 -57.1 -54.6 -54.8 71 -99 SPO 1997 10 30 23 20 65 1.8 -9 662.30 -57.0 -54.7 -54.8 71 -99 SPO 1997 10 30 23 21 66 2.0 -9 662.30 -57.0 -54.6 -55.0 72 -99 SPO 1997 10 30 23 22 61 1.8 -9 662.30 -57.0 -54.7 -55.1 73 -99 SPO 1997 10 30 23 23 56 1.7 -9 662.30 -57.0 -54.8 -55.1 73 -99 SPO 1997 10 30 23 24 62 1.9 -9 662.30 -57.0 -54.8 -55.1 73 -99 SPO 1997 10 30 23 25 65 2.3 -9 662.30 -56.9 -54.8 -55.2 73 -99 SPO 1997 10 30 23 26 65 2.3 -9 662.30 -56.9 -54.7 -55.2 72 -99 SPO 1997 10 30 23 27 64 2.2 -9 662.30 -56.8 -54.7 -55.3 71 -99 SPO 1997 10 30 23 28 59 2.0 -9 662.30 -56.8 -54.8 -55.2 71 -99 SPO 1997 10 30 23 29 59 2.0 -9 662.30 -56.8 -54.8 -55.2 71 -99 SPO 1997 10 30 23 30 62 2.3 -9 662.20 -56.6 -54.7 -55.2 70 -99 SPO 1997 10 30 23 31 64 2.6 -9 662.20 -56.4 -54.4 -55.2 69 -99 SPO 1997 10 30 23 32 64 2.6 -9 662.20 -56.4 -54.3 -55.3 70 -99 SPO 1997 10 30 23 33 55 2.1 -9 662.20 -56.6 -54.6 -55.3 72 -99 SPO 1997 10 30 23 34 50 1.9 -9 662.20 -56.7 -54.8 -55.3 73 -99 SPO 1997 10 30 23 35 49 2.0 -9 662.20 -56.7 -54.9 -55.3 72 -99 SPO 1997 10 30 23 36 53 2.2 -9 662.20 -56.6 -54.8 -55.2 71 -99 SPO 1997 10 30 23 37 54 2.2 -9 662.20 -56.6 -54.8 -55.2 71 -99 SPO 1997 10 30 23 38 59 2.4 -9 662.20 -56.5 -54.6 -55.2 70 -99 SPO 1997 10 30 23 39 59 2.5 -9 662.20 -56.4 -54.2 -55.2 69 -99 SPO 1997 10 30 23 40 58 2.6 -9 662.20 -56.5 -54.0 -55.2 70 -99 SPO 1997 10 30 23 41 57 2.7 -9 662.20 -56.5 -53.5 -55.3 70 -99 SPO 1997 10 30 23 42 54 2.7 -9 662.10 -56.5 -53.2 -55.3 69 -99 SPO 1997 10 30 23 43 49 2.5 -9 662.10 -56.6 -53.6 -55.3 69 -99 SPO 1997 10 30 23 44 50 2.8 -9 662.10 -56.6 -53.4 -55.3 68 -99 SPO 1997 10 30 23 45 52 3.0 -9 662.10 -56.6 -53.1 -55.3 68 -99 SPO 1997 10 30 23 46 52 3.0 -9 662.10 -56.5 -52.9 -55.3 67 -99 SPO 1997 10 30 23 47 53 3.0 -9 662.10 -56.6 -52.9 -55.4 68 -99 SPO 1997 10 30 23 48 54 3.1 -9 662.10 -56.6 -52.8 -55.4 68 -99 SPO 1997 10 30 23 49 55 3.1 -9 662.10 -56.5 -52.6 -55.4 69 -99 SPO 1997 10 30 23 50 55 3.0 -9 662.10 -56.6 -52.7 -55.5 69 -99 SPO 1997 10 30 23 51 56 3.1 -9 662.10 -56.6 -52.8 -55.5 69 -99 SPO 1997 10 30 23 52 58 3.1 -9 662.10 -56.5 -52.6 -55.4 69 -99 SPO 1997 10 30 23 53 59 3.0 -9 662.10 -56.4 -52.4 -55.4 67 -99 SPO 1997 10 30 23 54 59 2.9 -9 662.10 -56.5 -52.3 -55.3 68 -99 SPO 1997 10 30 23 55 61 2.9 -9 662.10 -56.4 -52.2 -55.2 67 -99 SPO 1997 10 30 23 56 63 2.8 -9 662.10 -56.4 -52.3 -55.1 67 -99 SPO 1997 10 30 23 57 64 2.7 -9 662.10 -56.5 -52.6 -54.9 68 -99 SPO 1997 10 30 23 58 64 2.7 -9 662.10 -56.5 -52.9 -54.8 -99 -99 SPO 1997 10 30 23 59 65 2.8 -9 662.10 -56.5 -52.8 -54.8 -99 -99 SPO 1997 10 31 00 00 66 2.9 -9 662.10 -56.5 -52.6 -54.8 -99 0 SPO 1997 10 31 00 01 66 2.7 -9 662.10 -56.5 -52.6 -54.8 -99 -99 SPO 1997 10 31 00 02 67 2.5 -9 662.10 -56.5 -52.9 -54.6 -99 -99 SPO 1997 10 31 00 03 69 2.5 -9 662.10 -56.5 -53.0 -54.4 65 -99 SPO 1997 10 31 00 04 70 2.5 -9 662.10 -56.5 -53.0 -54.2 65 -99 SPO 1997 10 31 00 05 70 2.5 -9 662.10 -56.5 -53.1 -54.2 65 -99 SPO 1997 10 31 00 06 70 2.5 -9 662.10 -56.5 -53.3 -54.2 66 -99 SPO 1997 10 31 00 07 69 2.6 -9 662.10 -56.5 -53.3 -54.4 67 -99 SPO 1997 10 31 00 08 69 2.5 -9 662.10 -56.4 -53.4 -54.6 67 -99 SPO 1997 10 31 00 09 68 2.5 -9 662.10 -56.5 -53.6 -54.6 68 -99 SPO 1997 10 31 00 10 68 2.4 -9 662.00 -56.7 -53.7 -54.6 70 -99 SPO 1997 10 31 00 11 67 2.5 -9 662.00 -56.7 -53.7 -54.8 70 -99 SPO 1997 10 31 00 12 68 2.5 -9 662.00 -56.9 -53.8 -54.9 71 -99 SPO 1997 10 31 00 13 68 2.4 -9 662.00 -56.9 -53.8 -54.8 71 -99 SPO 1997 10 31 00 14 68 2.3 -9 662.00 -57.0 -53.9 -54.7 71 -99 SPO 1997 10 31 00 15 69 2.3 -9 662.00 -57.0 -54.0 -54.7 71 -99 SPO 1997 10 31 00 16 69 2.5 -9 662.00 -57.0 -53.9 -54.8 70 -99 SPO 1997 10 31 00 17 71 2.7 -9 662.00 -57.0 -53.6 -54.7 70 -99 SPO 1997 10 31 00 18 69 2.7 -9 662.00 -57.0 -53.6 -54.8 69 -99 SPO 1997 10 31 00 19 70 2.6 -9 662.00 -57.0 -53.8 -55.0 68 -99 SPO 1997 10 31 00 20 71 2.6 -9 662.00 -57.0 -53.9 -55.0 68 -99 SPO 1997 10 31 00 21 72 2.4 -9 662.00 -57.0 -54.1 -54.9 69 -99 SPO 1997 10 31 00 22 73 2.3 -9 662.00 -56.5 -54.2 -54.7 66 -99 SPO 1997 10 31 00 23 72 2.3 -9 662.00 -999.9 -54.4 -54.8 -99 -99 SPO 1997 10 31 00 24 71 2.5 -9 662.00 -56.7 -54.4 -54.5 70 -99 SPO 1997 10 31 00 25 71 2.3 -9 662.00 -56.7 -54.2 -54.4 69 -99 SPO 1997 10 31 00 26 71 2.2 -9 662.00 -56.7 -54.4 -54.5 68 -99 SPO 1997 10 31 00 27 69 2.2 -9 662.00 -56.7 -54.4 -54.5 68 -99 SPO 1997 10 31 00 28 68 2.1 -9 662.00 -56.9 -54.4 -54.6 69 -99 SPO 1997 10 31 00 29 67 2.1 -9 662.00 -56.9 -54.4 -54.8 70 -99 SPO 1997 10 31 00 30 67 2.0 -9 662.00 -56.9 -54.6 -54.9 69 -99 SPO 1997 10 31 00 31 66 1.9 -9 662.00 -56.9 -54.5 -55.0 69 -99 SPO 1997 10 31 00 32 63 1.9 -9 662.00 -56.9 -54.4 -55.1 69 -99 SPO 1997 10 31 00 33 63 1.9 -9 662.00 -56.9 -54.6 -55.2 69 -99 SPO 1997 10 31 00 34 65 2.1 -9 662.00 -56.9 -54.4 -55.2 69 -99 SPO 1997 10 31 00 35 65 2.2 -9 662.00 -56.7 -54.2 -55.1 68 -99 SPO 1997 10 31 00 36 65 2.2 -9 662.00 -56.7 -54.2 -55.2 68 -99 SPO 1997 10 31 00 37 65 2.3 -9 661.90 -56.9 -54.2 -55.4 71 -99 SPO 1997 10 31 00 38 62 2.2 -9 661.90 -56.9 -54.3 -55.5 70 -99 SPO 1997 10 31 00 39 58 2.2 -9 661.90 -56.9 -54.4 -55.6 69 -99 SPO 1997 10 31 00 40 60 2.5 -9 661.90 -56.7 -54.2 -55.6 68 -99 SPO 1997 10 31 00 41 60 2.5 -9 661.90 -56.7 -53.9 -55.7 68 -99 SPO 1997 10 31 00 42 60 2.5 -9 661.90 -56.7 -53.9 -55.7 68 -99 SPO 1997 10 31 00 43 62 2.6 -9 661.90 -56.7 -53.8 -55.8 68 -99 SPO 1997 10 31 00 44 64 2.5 -9 662.00 -56.7 -53.8 -55.7 69 -99 SPO 1997 10 31 00 45 65 2.4 -9 661.90 -56.7 -53.8 -55.6 69 -99 SPO 1997 10 31 00 46 67 2.4 -9 661.90 -56.7 -53.7 -55.5 69 -99 SPO 1997 10 31 00 47 68 2.5 -9 661.90 -56.7 -53.7 -55.4 69 -99 SPO 1997 10 31 00 48 68 2.4 -9 661.90 -56.7 -53.7 -55.4 69 -99 SPO 1997 10 31 00 49 68 2.5 -9 661.90 -56.7 -53.7 -55.4 68 -99 SPO 1997 10 31 00 50 69 2.5 -9 661.90 -56.7 -53.7 -55.3 68 -99 SPO 1997 10 31 00 51 67 2.5 -9 661.90 -56.7 -53.7 -55.2 69 -99 SPO 1997 10 31 00 52 65 2.6 -9 661.90 -56.7 -53.7 -55.4 69 -99 SPO 1997 10 31 00 53 65 2.5 -9 661.90 -56.7 -53.7 -55.4 69 -99 SPO 1997 10 31 00 54 62 2.3 -9 661.90 -56.7 -53.8 -55.4 69 -99 SPO 1997 10 31 00 55 60 2.3 -9 661.90 -56.7 -53.9 -55.4 69 -99 SPO 1997 10 31 00 56 62 2.6 -9 661.90 -56.7 -53.8 -55.4 69 -99 SPO 1997 10 31 00 57 63 2.7 -9 661.90 -56.7 -53.7 -55.4 69 -99 SPO 1997 10 31 00 58 65 2.8 -9 661.90 -56.7 -53.6 -55.4 69 -99 SPO 1997 10 31 00 59 64 2.8 -9 661.90 -56.5 -53.6 -55.4 68 -99 SPO 1997 10 31 01 00 63 2.6 -9 661.90 -56.5 -53.6 -55.4 68 0 SPO 1997 10 31 01 01 62 2.5 -9 661.90 -56.7 -53.8 -55.4 69 -99 SPO 1997 10 31 01 02 63 2.6 -9 661.90 -56.7 -53.8 -55.4 69 -99 SPO 1997 10 31 01 03 63 2.4 -9 661.90 -56.7 -53.9 -55.4 69 -99 SPO 1997 10 31 01 04 63 2.2 -9 661.90 -56.7 -54.1 -55.3 69 -99 SPO 1997 10 31 01 05 64 2.3 -9 661.90 -56.7 -54.2 -55.2 69 -99 SPO 1997 10 31 01 06 66 2.6 -9 661.90 -56.7 -54.1 -55.2 69 -99 SPO 1997 10 31 01 07 65 2.7 -9 661.90 -56.7 -53.9 -55.2 69 -99 SPO 1997 10 31 01 08 62 2.2 -9 661.90 -56.7 -54.0 -55.2 69 -99 SPO 1997 10 31 01 09 61 2.0 -9 661.90 -56.7 -54.2 -55.1 70 -99 SPO 1997 10 31 01 10 66 2.2 -9 661.90 -56.7 -54.2 -55.1 70 -99 SPO 1997 10 31 01 11 69 2.5 -9 661.90 -56.5 -54.0 -54.9 68 -99 SPO 1997 10 31 01 12 69 2.6 -9 661.90 -56.5 -53.8 -54.8 68 -99 SPO 1997 10 31 01 13 68 2.7 -9 661.80 -56.5 -53.7 -54.8 69 -99 SPO 1997 10 31 01 14 69 2.7 -9 661.80 -56.5 -53.5 -54.8 69 -99 SPO 1997 10 31 01 15 69 2.8 -9 661.80 -56.5 -53.3 -54.7 69 -99 SPO 1997 10 31 01 16 69 2.7 -9 661.80 -56.7 -53.3 -54.6 71 -99 SPO 1997 10 31 01 17 70 2.8 -9 661.80 -56.7 -53.6 -54.6 70 -99 SPO 1997 10 31 01 18 70 2.6 -9 661.80 -56.7 -53.7 -54.6 69 -99 SPO 1997 10 31 01 19 70 2.5 -9 661.80 -56.7 -53.8 -54.5 69 -99 SPO 1997 10 31 01 20 71 2.4 -9 661.80 -56.7 -54.0 -54.4 69 -99 SPO 1997 10 31 01 21 71 2.5 -9 661.80 -56.5 -54.0 -54.3 68 -99 SPO 1997 10 31 01 22 74 2.5 -9 661.80 -56.5 -53.8 -54.3 67 -99 SPO 1997 10 31 01 23 73 2.5 -9 661.80 -56.5 -53.4 -54.4 67 -99 SPO 1997 10 31 01 24 71 2.6 -9 661.80 -56.7 -53.2 -54.6 68 -99 SPO 1997 10 31 01 25 73 2.6 -9 661.80 -56.7 -52.9 -54.7 68 -99 SPO 1997 10 31 01 26 72 2.6 -9 661.80 -56.7 -52.6 -54.8 68 -99 SPO 1997 10 31 01 27 73 2.6 -9 661.80 -56.7 -52.4 -54.8 68 -99 SPO 1997 10 31 01 28 72 2.5 -9 661.80 -56.7 -52.2 -55.0 68 -99 SPO 1997 10 31 01 29 72 2.8 -9 661.80 -56.7 -52.1 -55.0 68 -99 SPO 1997 10 31 01 30 74 2.7 -9 661.80 -56.9 -52.2 -55.1 69 -99 SPO 1997 10 31 01 31 74 2.7 -9 661.80 -57.0 -52.4 -55.2 69 -99 SPO 1997 10 31 01 32 73 2.9 -9 661.80 -57.0 -52.4 -55.4 69 -99 SPO 1997 10 31 01 33 72 2.9 -9 661.80 -57.0 -52.3 -55.4 68 -99 SPO 1997 10 31 01 34 70 3.2 -9 661.80 -57.0 -52.1 -55.3 67 -99 SPO 1997 10 31 01 35 69 3.1 -9 661.80 -57.2 -52.1 -55.3 68 -99 SPO 1997 10 31 01 36 68 3.2 -9 661.80 -57.2 -51.9 -55.3 68 -99 SPO 1997 10 31 01 37 66 3.2 -9 661.80 -57.2 -51.7 -55.3 67 -99 SPO 1997 10 31 01 38 66 3.2 -9 661.70 -57.2 -51.5 -55.2 66 -99 SPO 1997 10 31 01 39 63 3.4 -9 661.70 -57.2 -51.1 -55.3 66 -99 SPO 1997 10 31 01 40 63 3.3 -9 661.70 -57.2 -51.0 -55.3 66 -99 SPO 1997 10 31 01 41 62 3.4 -9 661.70 -57.2 -51.2 -55.3 67 -99 SPO 1997 10 31 01 42 62 3.4 -9 661.70 -57.0 -51.3 -55.3 65 -99 SPO 1997 10 31 01 43 62 3.4 -9 661.70 -57.0 -51.4 -55.3 65 -99 SPO 1997 10 31 01 44 65 3.3 -9 661.70 -57.0 -51.2 -55.3 66 -99 SPO 1997 10 31 01 45 64 3.5 -9 661.70 -57.0 -51.1 -55.3 67 -99 SPO 1997 10 31 01 46 61 3.6 -9 661.70 -57.2 -51.0 -55.4 68 -99 SPO 1997 10 31 01 47 59 3.6 -9 661.70 -57.2 -51.0 -55.5 68 -99 SPO 1997 10 31 01 48 59 3.6 -9 661.70 -57.2 -50.8 -55.6 68 -99 SPO 1997 10 31 01 49 59 3.6 -9 661.70 -57.0 -50.5 -55.6 68 -99 SPO 1997 10 31 01 50 60 3.6 -9 661.70 -57.0 -50.3 -55.6 68 -99 SPO 1997 10 31 01 51 60 3.5 -9 661.70 -56.9 -50.4 -55.5 67 -99 SPO 1997 10 31 01 52 60 3.5 -9 661.70 -56.7 -50.9 -55.5 66 -99 SPO 1997 10 31 01 53 63 3.5 -9 661.70 -56.7 -51.2 -55.4 67 -99 SPO 1997 10 31 01 54 64 3.4 -9 661.70 -56.9 -51.4 -55.3 68 -99 SPO 1997 10 31 01 55 64 3.4 -9 661.70 -56.9 -51.6 -55.3 67 -99 SPO 1997 10 31 01 56 63 3.4 -9 661.80 -56.9 -51.6 -55.3 67 -99 SPO 1997 10 31 01 57 63 3.4 -9 661.80 -56.9 -51.6 -55.3 67 -99 SPO 1997 10 31 01 58 61 3.4 -9 661.80 -56.9 -51.7 -55.3 67 -99 SPO 1997 10 31 01 59 63 3.2 -9 661.80 -57.0 -52.0 -55.3 68 -99 SPO 1997 10 31 02 00 64 3.2 -9 661.80 -56.9 -52.1 -55.2 67 0 SPO 1997 10 31 02 01 63 3.3 -9 661.80 -56.9 -52.0 -55.2 68 -99 SPO 1997 10 31 02 02 62 3.4 -9 661.80 -56.9 -51.6 -55.3 68 -99 SPO 1997 10 31 02 03 63 3.2 -9 661.70 -56.9 -51.5 -55.4 68 -99 SPO 1997 10 31 02 04 63 3.4 -9 661.70 -56.9 -51.4 -55.4 68 -99 SPO 1997 10 31 02 05 63 3.3 -9 661.70 -56.9 -51.1 -55.3 68 -99 SPO 1997 10 31 02 06 63 3.1 -9 661.70 -56.9 -51.2 -55.3 68 -99 SPO 1997 10 31 02 07 63 2.6 -9 661.70 -56.9 -52.0 -55.2 68 -99 SPO 1997 10 31 02 08 63 2.2 -9 661.70 -56.9 -53.3 -55.2 68 -99 SPO 1997 10 31 02 09 66 1.8 -9 661.70 -56.9 -54.1 -54.9 68 -99 SPO 1997 10 31 02 10 66 2.0 -9 661.70 -56.7 -54.3 -54.6 66 -99 SPO 1997 10 31 02 11 66 2.3 -9 661.70 -56.7 -54.0 -54.4 67 -99 SPO 1997 10 31 02 12 66 2.3 -9 661.70 -56.7 -53.9 -54.5 66 -99 SPO 1997 10 31 02 13 66 2.3 -9 661.70 -56.9 -54.1 -54.5 68 -99 SPO 1997 10 31 02 14 67 2.5 -9 661.60 -56.9 -54.0 -54.6 68 -99 SPO 1997 10 31 02 15 64 2.6 -9 661.60 -56.9 -53.8 -54.6 68 -99 SPO 1997 10 31 02 16 64 2.7 -9 661.60 -57.0 -53.8 -54.7 68 -99 SPO 1997 10 31 02 17 65 2.6 -9 661.60 -57.0 -53.6 -54.7 68 -99 SPO 1997 10 31 02 18 65 2.1 -9 661.60 -57.0 -53.8 -54.8 68 -99 SPO 1997 10 31 02 19 62 1.7 -9 661.60 -57.2 -54.3 -55.0 70 -99 SPO 1997 10 31 02 20 66 2.1 -9 661.60 -57.0 -54.4 -55.0 68 -99 SPO 1997 10 31 02 21 66 2.3 -9 661.60 -57.0 -54.4 -54.8 68 -99 SPO 1997 10 31 02 22 62 2.4 -9 661.60 -57.0 -54.4 -55.2 69 -99 SPO 1997 10 31 02 23 60 2.7 -9 661.60 -57.0 -54.3 -55.5 68 -99 SPO 1997 10 31 02 24 61 2.8 -9 661.60 -57.0 -54.1 -55.6 68 -99 SPO 1997 10 31 02 25 62 2.7 -9 661.60 -57.0 -54.1 -55.5 68 -99 SPO 1997 10 31 02 26 62 2.6 -9 661.60 -57.0 -54.2 -55.5 67 -99 SPO 1997 10 31 02 27 64 2.9 -9 661.60 -57.0 -54.0 -55.4 66 -99 SPO 1997 10 31 02 28 63 3.1 -9 661.60 -57.0 -53.7 -55.4 66 -99 SPO 1997 10 31 02 29 63 3.0 -9 661.60 -57.0 -53.6 -55.6 66 -99 SPO 1997 10 31 02 30 63 2.9 -9 661.60 -56.9 -53.7 -55.6 65 -99 SPO 1997 10 31 02 31 64 2.9 -9 661.60 -56.9 -53.8 -55.6 66 -99 SPO 1997 10 31 02 32 64 2.8 -9 661.60 -56.9 -53.7 -55.6 67 -99 SPO 1997 10 31 02 33 63 2.8 -9 661.70 -56.9 -53.8 -55.7 67 -99 SPO 1997 10 31 02 34 61 2.8 -9 661.70 -56.9 -53.9 -55.7 67 -99 SPO 1997 10 31 02 35 61 2.9 -9 661.70 -56.9 -53.8 -55.7 66 -99 SPO 1997 10 31 02 36 61 2.9 -9 661.70 -56.9 -53.6 -55.7 67 -99 SPO 1997 10 31 02 37 62 2.9 -9 661.70 -56.9 -53.2 -55.7 67 -99 SPO 1997 10 31 02 38 60 2.9 -9 661.70 -56.9 -53.1 -55.7 67 -99 SPO 1997 10 31 02 39 60 2.9 -9 661.70 -56.9 -53.3 -55.8 67 -99 SPO 1997 10 31 02 40 59 3.0 -9 661.70 -56.9 -53.4 -55.7 67 -99 SPO 1997 10 31 02 41 60 3.1 -9 661.70 -56.9 -53.4 -55.8 67 -99 SPO 1997 10 31 02 42 60 3.2 -9 661.70 -56.9 -53.3 -55.8 66 -99 SPO 1997 10 31 02 43 58 3.4 -9 661.70 -56.9 -53.0 -55.8 66 -99 SPO 1997 10 31 02 44 57 3.5 -9 661.70 -56.9 -52.6 -55.9 65 -99 SPO 1997 10 31 02 45 56 3.6 -9 661.60 -56.9 -52.4 -55.9 65 -99 SPO 1997 10 31 02 46 56 3.5 -9 661.60 -56.7 -52.4 -56.0 64 -99 SPO 1997 10 31 02 47 55 3.5 -9 661.60 -56.7 -52.6 -56.0 64 -99 SPO 1997 10 31 02 48 56 3.4 -9 661.70 -56.7 -52.6 -56.0 64 -99 SPO 1997 10 31 02 49 56 3.4 -9 661.60 -56.7 -52.6 -55.9 64 -99 SPO 1997 10 31 02 50 55 3.5 -9 661.60 -56.7 -52.2 -55.8 64 -99 SPO 1997 10 31 02 51 56 3.3 -9 661.60 -56.7 -52.0 -55.8 65 -99 SPO 1997 10 31 02 52 60 3.2 -9 661.70 -56.7 -51.9 -55.6 66 -99 SPO 1997 10 31 02 53 63 2.9 -9 661.70 -56.7 -51.9 -55.4 66 -99 SPO 1997 10 31 02 54 65 2.9 -9 661.70 -56.7 -52.0 -55.1 66 -99 SPO 1997 10 31 02 55 66 2.8 -9 661.70 -56.7 -52.1 -55.0 66 -99 SPO 1997 10 31 02 56 66 2.9 -9 661.70 -56.7 -51.9 -54.9 66 -99 SPO 1997 10 31 02 57 65 2.9 -9 661.70 -56.7 -51.8 -54.9 65 -99 SPO 1997 10 31 02 58 67 2.8 -9 661.70 -56.7 -52.1 -54.9 64 -99 SPO 1997 10 31 02 59 68 2.7 -9 661.70 -56.7 -52.1 -55.0 64 -99 SPO 1997 10 31 03 00 67 2.7 -9 661.70 -56.7 -52.3 -54.9 64 0 SPO 1997 10 31 03 01 66 2.7 -9 661.70 -56.7 -52.3 -54.9 64 -99 SPO 1997 10 31 03 02 64 2.9 -9 661.70 -56.7 -52.2 -54.9 64 -99 SPO 1997 10 31 03 03 62 2.9 -9 661.70 -56.7 -52.1 -54.9 64 -99 SPO 1997 10 31 03 04 62 3.0 -9 661.60 -56.7 -52.1 -55.0 64 -99 SPO 1997 10 31 03 05 63 2.9 -9 661.60 -56.7 -52.2 -55.0 65 -99 SPO 1997 10 31 03 06 64 2.9 -9 661.60 -56.7 -52.3 -55.0 66 -99 SPO 1997 10 31 03 07 67 2.9 -9 661.60 -56.7 -52.4 -55.0 66 -99 SPO 1997 10 31 03 08 65 3.0 -9 661.60 -56.7 -52.4 -54.9 66 -99 SPO 1997 10 31 03 09 62 3.0 -9 661.60 -56.9 -52.3 -54.9 67 -99 SPO 1997 10 31 03 10 61 3.0 -9 661.60 -56.9 -52.0 -54.9 67 -99 SPO 1997 10 31 03 11 62 3.0 -9 661.60 -56.9 -52.0 -55.0 66 -99 SPO 1997 10 31 03 12 63 3.0 -9 661.60 -56.9 -52.0 -55.0 65 -99 SPO 1997 10 31 03 13 65 3.0 -9 661.60 -56.9 -52.2 -54.9 65 -99 SPO 1997 10 31 03 14 66 2.9 -9 661.60 -56.9 -52.8 -54.9 65 -99 SPO 1997 10 31 03 15 66 2.9 -9 661.60 -56.9 -53.2 -54.9 66 -99 SPO 1997 10 31 03 16 64 2.9 -9 661.60 -56.9 -52.8 -54.9 66 -99 SPO 1997 10 31 03 17 61 3.0 -9 661.50 -57.0 -52.5 -54.9 67 -99 SPO 1997 10 31 03 18 59 3.0 -9 661.50 -56.9 -52.2 -55.0 67 -99 SPO 1997 10 31 03 19 58 3.0 -9 661.50 -56.9 -52.3 -55.3 67 -99 SPO 1997 10 31 03 20 58 3.0 -9 661.50 -56.9 -52.2 -55.4 67 -99 SPO 1997 10 31 03 21 59 3.0 -9 661.50 -56.9 -52.3 -55.4 67 -99 SPO 1997 10 31 03 22 57 3.0 -9 661.50 -56.9 -52.5 -55.5 67 -99 SPO 1997 10 31 03 23 58 3.0 -9 661.50 -56.7 -52.7 -55.4 66 -99 SPO 1997 10 31 03 24 58 2.9 -9 661.50 -56.7 -52.7 -55.4 66 -99 SPO 1997 10 31 03 25 57 2.9 -9 661.50 -56.7 -52.8 -55.3 66 -99 SPO 1997 10 31 03 26 57 2.9 -9 661.50 -56.7 -52.9 -55.2 66 -99 SPO 1997 10 31 03 27 56 3.0 -9 661.50 -56.7 -52.5 -55.2 66 -99 SPO 1997 10 31 03 28 56 3.0 -9 661.50 -56.7 -52.2 -55.3 66 -99 SPO 1997 10 31 03 29 56 3.0 -9 661.50 -56.7 -52.3 -55.4 66 -99 SPO 1997 10 31 03 30 57 2.9 -9 661.50 -56.7 -52.1 -55.3 66 -99 SPO 1997 10 31 03 31 57 2.8 -9 661.50 -56.7 -52.2 -55.1 67 -99 SPO 1997 10 31 03 32 58 2.8 -9 661.50 -56.7 -52.3 -55.0 67 -99 SPO 1997 10 31 03 33 56 2.9 -9 661.50 -56.7 -52.2 -55.1 67 -99 SPO 1997 10 31 03 34 54 3.0 -9 661.50 -56.7 -52.0 -55.2 67 -99 SPO 1997 10 31 03 35 54 3.1 -9 661.50 -56.7 -51.9 -55.4 67 -99 SPO 1997 10 31 03 36 54 3.1 -9 661.50 -56.7 -51.9 -55.4 67 -99 SPO 1997 10 31 03 37 54 3.2 -9 661.50 -56.7 -51.9 -55.4 67 -99 SPO 1997 10 31 03 38 53 3.2 -9 661.50 -56.7 -52.0 -55.4 67 -99 SPO 1997 10 31 03 39 54 3.3 -9 661.50 -56.7 -52.0 -55.5 67 -99 SPO 1997 10 31 03 40 52 3.3 -9 661.50 -56.7 -52.0 -55.6 68 -99 SPO 1997 10 31 03 41 52 3.4 -9 661.50 -56.7 -51.9 -55.6 67 -99 SPO 1997 10 31 03 42 52 3.3 -9 661.50 -56.7 -51.8 -55.6 67 -99 SPO 1997 10 31 03 43 51 3.3 -9 661.50 -56.7 -51.6 -55.6 66 -99 SPO 1997 10 31 03 44 51 3.4 -9 661.50 -56.7 -51.5 -55.6 66 -99 SPO 1997 10 31 03 45 52 3.3 -9 661.50 -56.7 -51.6 -55.5 66 -99 SPO 1997 10 31 03 46 53 3.4 -9 661.50 -56.7 -51.6 -55.5 67 -99 SPO 1997 10 31 03 47 52 3.4 -9 661.50 -56.7 -51.7 -55.5 68 -99 SPO 1997 10 31 03 48 52 3.5 -9 661.50 -56.7 -51.6 -55.6 68 -99 SPO 1997 10 31 03 49 51 3.5 -9 661.50 -56.7 -51.7 -55.6 68 -99 SPO 1997 10 31 03 50 50 3.6 -9 661.50 -56.7 -51.8 -55.7 68 -99 SPO 1997 10 31 03 51 51 3.5 -9 661.50 -56.7 -51.8 -55.6 68 -99 SPO 1997 10 31 03 52 51 3.5 -9 661.50 -56.7 -51.7 -55.6 68 -99 SPO 1997 10 31 03 53 51 3.5 -9 661.50 -56.7 -51.5 -55.6 68 -99 SPO 1997 10 31 03 54 50 3.7 -9 661.50 -56.5 -51.5 -55.6 66 -99 SPO 1997 10 31 03 55 49 3.7 -9 661.50 -56.5 -51.5 -55.7 66 -99 SPO 1997 10 31 03 56 48 3.7 -9 661.50 -56.5 -51.3 -55.7 66 -99 SPO 1997 10 31 03 57 48 3.7 -9 661.40 -56.5 -51.3 -55.7 65 -99 SPO 1997 10 31 03 58 49 3.6 -9 661.40 -56.5 -51.0 -55.7 64 -99 SPO 1997 10 31 03 59 51 3.5 -9 661.40 -56.5 -50.8 -55.6 64 -99 SPO 1997 10 31 04 00 54 3.3 -9 661.50 -56.5 -50.9 -55.6 64 0 SPO 1997 10 31 04 01 56 3.2 -9 661.50 -56.7 -51.0 -55.4 66 -99 SPO 1997 10 31 04 02 57 3.2 -9 661.50 -56.7 -51.1 -55.2 66 -99 SPO 1997 10 31 04 03 57 3.1 -9 661.40 -56.7 -51.0 -55.2 66 -99 SPO 1997 10 31 04 04 55 3.1 -9 661.40 -56.7 -51.0 -55.2 66 -99 SPO 1997 10 31 04 05 54 3.2 -9 661.40 -56.7 -51.1 -55.3 66 -99 SPO 1997 10 31 04 06 53 3.2 -9 661.40 -56.7 -50.9 -55.3 65 -99 SPO 1997 10 31 04 07 53 3.2 -9 661.40 -56.7 -50.7 -55.3 64 -99 SPO 1997 10 31 04 08 54 3.1 -9 661.40 -56.7 -50.8 -55.3 64 -99 SPO 1997 10 31 04 09 57 3.0 -9 661.40 -56.7 -50.8 -55.2 64 -99 SPO 1997 10 31 04 10 60 2.9 -9 661.40 -56.7 -50.8 -55.0 64 -99 SPO 1997 10 31 04 11 62 2.9 -9 661.40 -56.9 -51.2 -55.0 66 -99 SPO 1997 10 31 04 12 62 2.9 -9 661.40 -56.9 -51.6 -55.0 65 -99 SPO 1997 10 31 04 13 64 2.9 -9 661.40 -56.9 -51.7 -55.0 64 -99 SPO 1997 10 31 04 14 65 3.0 -9 661.40 -56.9 -51.8 -55.0 64 -99 SPO 1997 10 31 04 15 66 2.8 -9 661.40 -56.7 -51.8 -55.0 63 -99 SPO 1997 10 31 04 16 69 2.7 -9 661.40 -56.9 -52.0 -55.1 65 -99 SPO 1997 10 31 04 17 69 2.7 -9 661.50 -56.9 -52.0 -55.2 65 -99 SPO 1997 10 31 04 18 72 2.6 -9 661.50 -57.0 -52.2 -55.3 65 -99 SPO 1997 10 31 04 19 75 2.6 -9 661.50 -57.0 -52.0 -55.4 65 -99 SPO 1997 10 31 04 20 72 2.7 -9 661.50 -57.0 -52.2 -55.5 65 -99 SPO 1997 10 31 04 21 69 2.7 -9 661.40 -57.0 -51.9 -55.3 65 -99 SPO 1997 10 31 04 22 67 2.8 -9 661.40 -57.0 -51.7 -55.1 65 -99 SPO 1997 10 31 04 23 67 2.7 -9 661.40 -57.0 -52.0 -55.0 65 -99 SPO 1997 10 31 04 24 70 2.8 -9 661.40 -57.0 -51.9 -55.0 66 -99 SPO 1997 10 31 04 25 71 2.8 -9 661.40 -57.0 -51.7 -55.0 66 -99 SPO 1997 10 31 04 26 72 2.7 -9 661.40 -57.0 -51.8 -55.0 66 -99 SPO 1997 10 31 04 27 72 2.6 -9 661.40 -57.0 -52.0 -55.1 66 -99 SPO 1997 10 31 04 28 74 2.5 -9 661.50 -57.0 -52.3 -55.2 65 -99 SPO 1997 10 31 04 29 76 2.5 -9 661.50 -57.2 -52.6 -55.4 65 -99 SPO 1997 10 31 04 30 75 2.5 -9 661.50 -57.2 -52.7 -55.6 64 -99 SPO 1997 10 31 04 31 75 2.5 -9 661.50 -57.2 -52.6 -55.7 64 -99 SPO 1997 10 31 04 32 76 2.5 -9 661.50 -57.2 -52.5 -55.6 64 -99 SPO 1997 10 31 04 33 78 2.4 -9 661.50 -57.2 -52.6 -55.6 65 -99 SPO 1997 10 31 04 34 80 2.5 -9 661.50 -57.2 -52.8 -55.8 65 -99 SPO 1997 10 31 04 35 83 2.4 -9 661.50 -57.2 -52.8 -55.9 65 -99 SPO 1997 10 31 04 36 84 2.4 -9 661.50 -57.2 -52.8 -55.9 65 -99 SPO 1997 10 31 04 37 83 2.5 -9 661.50 -57.2 -53.0 -55.9 65 -99 SPO 1997 10 31 04 38 82 2.5 -9 661.50 -57.2 -52.8 -55.9 66 -99 SPO 1997 10 31 04 39 80 2.7 -9 661.50 -57.2 -52.7 -55.8 66 -99 SPO 1997 10 31 04 40 80 2.7 -9 661.50 -57.2 -52.7 -55.7 66 -99 SPO 1997 10 31 04 41 84 2.7 -9 661.50 -57.2 -52.8 -55.8 66 -99 SPO 1997 10 31 04 42 86 2.7 -9 661.50 -57.2 -53.0 -55.9 66 -99 SPO 1997 10 31 04 43 85 2.7 -9 661.50 -57.2 -53.0 -56.0 65 -99 SPO 1997 10 31 04 44 82 2.8 -9 661.50 -57.2 -53.2 -55.9 65 -99 SPO 1997 10 31 04 45 80 2.8 -9 661.50 -57.2 -53.3 -55.8 64 -99 SPO 1997 10 31 04 46 81 2.8 -9 661.50 -57.2 -53.2 -55.7 64 -99 SPO 1997 10 31 04 47 81 2.8 -9 661.50 -57.2 -53.3 -55.8 63 -99 SPO 1997 10 31 04 48 81 2.9 -9 661.50 -57.2 -53.6 -55.8 64 -99 SPO 1997 10 31 04 49 79 2.9 -9 661.50 -57.2 -53.7 -55.7 65 -99 SPO 1997 10 31 04 50 76 3.0 -9 661.50 -57.2 -53.5 -55.6 65 -99 SPO 1997 10 31 04 51 76 2.9 -9 661.50 -57.2 -53.8 -55.4 66 -99 SPO 1997 10 31 04 52 76 2.9 -9 661.50 -57.2 -53.8 -55.3 66 -99 SPO 1997 10 31 04 53 75 2.8 -9 661.50 -57.0 -53.7 -55.3 64 -99 SPO 1997 10 31 04 54 74 2.8 -9 661.50 -57.0 -53.6 -55.3 65 -99 SPO 1997 10 31 04 55 74 2.8 -9 661.50 -57.0 -53.3 -55.2 65 -99 SPO 1997 10 31 04 56 72 2.8 -9 661.50 -57.0 -53.1 -55.2 65 -99 SPO 1997 10 31 04 57 71 2.9 -9 661.50 -57.0 -53.0 -55.1 65 -99 SPO 1997 10 31 04 58 71 2.8 -9 661.50 -57.0 -53.2 -55.1 66 -99 SPO 1997 10 31 04 59 69 3.0 -9 661.50 -57.0 -53.0 -55.1 66 -99 SPO 1997 10 31 05 00 67 2.9 -9 661.40 -57.0 -53.0 -55.1 66 0 SPO 1997 10 31 05 01 66 3.0 -9 661.50 -57.0 -52.8 -55.2 65 -99 SPO 1997 10 31 05 02 65 3.0 -9 661.40 -57.0 -52.3 -55.2 65 -99 SPO 1997 10 31 05 03 63 3.0 -9 661.40 -57.0 -52.4 -55.1 65 -99 SPO 1997 10 31 05 04 63 3.0 -9 661.50 -57.0 -52.5 -55.0 66 -99 SPO 1997 10 31 05 05 63 2.9 -9 661.50 -57.0 -52.7 -55.0 67 -99 SPO 1997 10 31 05 06 62 3.0 -9 661.40 -57.0 -52.7 -54.9 67 -99 SPO 1997 10 31 05 07 61 3.0 -9 661.40 -57.0 -52.6 -54.9 67 -99 SPO 1997 10 31 05 08 61 3.0 -9 661.40 -57.0 -52.4 -54.9 68 -99 SPO 1997 10 31 05 09 61 2.9 -9 661.40 -57.0 -52.5 -54.9 68 -99 SPO 1997 10 31 05 10 63 2.8 -9 661.50 -56.9 -52.9 -54.8 67 -99 SPO 1997 10 31 05 11 64 2.7 -9 661.50 -56.9 -53.0 -54.6 68 -99 SPO 1997 10 31 05 12 64 2.7 -9 661.50 -56.9 -53.0 -54.6 68 -99 SPO 1997 10 31 05 13 65 2.8 -9 661.50 -56.9 -52.9 -54.6 68 -99 SPO 1997 10 31 05 14 65 2.8 -9 661.50 -56.9 -52.8 -54.6 68 -99 SPO 1997 10 31 05 15 63 2.8 -9 661.40 -56.9 -52.9 -54.6 68 -99 SPO 1997 10 31 05 16 61 2.9 -9 661.40 -56.7 -52.9 -54.6 66 -99 SPO 1997 10 31 05 17 59 2.9 -9 661.40 -56.9 -52.9 -54.7 68 -99 SPO 1997 10 31 05 18 59 3.0 -9 661.40 -56.9 -52.7 -54.9 68 -99 SPO 1997 10 31 05 19 58 3.0 -9 661.40 -56.9 -52.6 -55.0 68 -99 SPO 1997 10 31 05 20 58 3.0 -9 661.40 -56.7 -52.6 -55.0 66 -99 SPO 1997 10 31 05 21 59 3.1 -9 661.40 -56.7 -52.8 -55.1 66 -99 SPO 1997 10 31 05 22 58 3.2 -9 661.40 -56.7 -52.6 -55.0 66 -99 SPO 1997 10 31 05 23 56 3.3 -9 661.40 -56.7 -52.3 -55.0 67 -99 SPO 1997 10 31 05 24 55 3.3 -9 661.40 -56.7 -52.2 -55.2 68 -99 SPO 1997 10 31 05 25 54 3.4 -9 661.30 -56.7 -52.0 -55.3 68 -99 SPO 1997 10 31 05 26 53 3.4 -9 661.30 -56.5 -52.1 -55.3 67 -99 SPO 1997 10 31 05 27 52 3.4 -9 661.30 -56.5 -52.1 -55.4 67 -99 SPO 1997 10 31 05 28 51 3.5 -9 661.30 -56.5 -51.9 -55.4 68 -99 SPO 1997 10 31 05 29 49 3.6 -9 661.30 -56.5 -52.0 -55.4 68 -99 SPO 1997 10 31 05 30 47 3.7 -9 661.30 -56.5 -51.7 -55.5 68 -99 SPO 1997 10 31 05 31 45 3.9 -9 661.30 -56.4 -51.4 -55.5 68 -99 SPO 1997 10 31 05 32 44 4.0 -9 661.30 -56.4 -51.5 -55.6 68 -99 SPO 1997 10 31 05 33 41 4.0 -9 661.40 -56.2 -51.5 -55.6 66 -99 SPO 1997 10 31 05 34 44 4.1 -9 661.40 -56.2 -51.5 -55.6 66 -99 SPO 1997 10 31 05 35 43 3.9 -9 661.40 -56.2 -51.4 -55.6 65 -99 SPO 1997 10 31 05 36 43 4.0 -9 661.40 -56.2 -51.3 -55.5 65 -99 SPO 1997 10 31 05 37 42 4.1 -9 661.40 -56.2 -51.2 -55.5 65 -99 SPO 1997 10 31 05 38 42 4.2 -9 661.40 -56.2 -51.3 -55.5 65 -99 SPO 1997 10 31 05 39 39 4.1 -9 661.40 -56.0 -51.3 -55.5 65 -99 SPO 1997 10 31 05 40 40 3.9 -9 661.40 -56.0 -51.3 -55.4 65 -99 SPO 1997 10 31 05 41 44 3.9 -9 661.40 -56.0 -51.3 -55.4 65 -99 SPO 1997 10 31 05 42 46 3.8 -9 661.40 -56.0 -51.2 -55.4 65 -99 SPO 1997 10 31 05 43 47 3.7 -9 661.40 -56.0 -51.2 -55.3 65 -99 SPO 1997 10 31 05 44 47 3.6 -9 661.40 -56.0 -51.3 -55.3 65 -99 SPO 1997 10 31 05 45 49 3.3 -9 661.40 -56.2 -51.4 -55.2 66 -99 SPO 1997 10 31 05 46 51 3.2 -9 661.40 -56.2 -51.4 -55.1 66 -99 SPO 1997 10 31 05 47 52 3.2 -9 661.40 -56.2 -51.3 -55.0 66 -99 SPO 1997 10 31 05 48 50 3.2 -9 661.40 -56.2 -51.3 -55.0 67 -99 SPO 1997 10 31 05 49 49 3.4 -9 661.30 -56.2 -51.3 -55.1 67 -99 SPO 1997 10 31 05 50 49 3.4 -9 661.30 -56.2 -51.4 -55.2 66 -99 SPO 1997 10 31 05 51 51 3.5 -9 661.30 -56.2 -51.4 -55.3 66 -99 SPO 1997 10 31 05 52 51 3.4 -9 661.30 -56.2 -51.4 -55.3 65 -99 SPO 1997 10 31 05 53 52 3.3 -9 661.30 -56.2 -51.4 -55.2 65 -99 SPO 1997 10 31 05 54 53 3.2 -9 661.30 -56.4 -51.6 -55.2 67 -99 SPO 1997 10 31 05 55 54 3.4 -9 661.30 -56.4 -51.6 -55.1 67 -99 SPO 1997 10 31 05 56 53 3.3 -9 661.30 -56.4 -51.6 -55.1 67 -99 SPO 1997 10 31 05 57 53 3.4 -9 661.30 -56.4 -51.6 -55.1 67 -99 SPO 1997 10 31 05 58 54 3.4 -9 661.30 -56.4 -51.7 -55.1 66 -99 SPO 1997 10 31 05 59 55 3.2 -9 661.30 -56.4 -51.6 -55.0 66 -99 SPO 1997 10 31 06 00 58 3.1 -9 661.40 -56.4 -51.7 -54.9 66 0 SPO 1997 10 31 06 01 60 3.0 -9 661.40 -56.4 -52.1 -54.8 66 -99 SPO 1997 10 31 06 02 61 3.0 -9 661.40 -56.4 -52.4 -54.7 66 -99 SPO 1997 10 31 06 03 62 3.0 -9 661.40 -56.4 -52.6 -54.6 66 -99 SPO 1997 10 31 06 04 60 3.1 -9 661.40 -56.4 -52.8 -54.6 66 -99 SPO 1997 10 31 06 05 58 3.2 -9 661.40 -56.4 -52.7 -54.6 66 -99 SPO 1997 10 31 06 06 59 3.2 -9 661.40 -56.4 -52.6 -54.8 66 -99 SPO 1997 10 31 06 07 58 3.3 -9 661.40 -56.5 -52.6 -54.9 66 -99 SPO 1997 10 31 06 08 59 3.3 -9 661.40 -56.4 -52.4 -54.8 65 -99 SPO 1997 10 31 06 09 58 3.2 -9 661.40 -56.5 -52.4 -54.8 65 -99 SPO 1997 10 31 06 10 58 3.1 -9 661.40 -56.5 -52.6 -54.8 65 -99 SPO 1997 10 31 06 11 58 3.1 -9 661.40 -56.5 -52.8 -54.8 65 -99 SPO 1997 10 31 06 12 59 3.1 -9 661.40 -56.5 -52.5 -54.6 65 -99 SPO 1997 10 31 06 13 61 3.0 -9 661.40 -56.5 -52.2 -54.6 65 -99 SPO 1997 10 31 06 14 62 3.0 -9 661.40 -56.5 -52.3 -54.6 65 -99 SPO 1997 10 31 06 15 62 3.1 -9 661.40 -56.5 -52.4 -54.5 65 -99 SPO 1997 10 31 06 16 61 3.2 -9 661.30 -56.5 -52.2 -54.5 65 -99 SPO 1997 10 31 06 17 59 3.3 -9 661.30 -56.7 -52.6 -54.6 67 -99 SPO 1997 10 31 06 18 59 3.3 -9 661.30 -56.7 -52.7 -54.7 67 -99 SPO 1997 10 31 06 19 59 3.3 -9 661.30 -56.7 -52.6 -54.7 66 -99 SPO 1997 10 31 06 20 60 3.3 -9 661.40 -56.7 -52.5 -54.6 66 -99 SPO 1997 10 31 06 21 61 3.4 -9 661.40 -56.7 -52.6 -54.6 66 -99 SPO 1997 10 31 06 22 60 3.4 -9 661.40 -56.7 -52.7 -54.7 66 -99 SPO 1997 10 31 06 23 59 3.4 -9 661.40 -56.7 -52.6 -54.7 65 -99 SPO 1997 10 31 06 24 59 3.4 -9 661.40 -56.7 -52.6 -54.8 65 -99 SPO 1997 10 31 06 25 60 3.4 -9 661.40 -56.7 -52.6 -54.8 65 -99 SPO 1997 10 31 06 26 60 3.4 -9 661.40 -56.7 -52.7 -54.8 64 -99 SPO 1997 10 31 06 27 59 3.4 -9 661.40 -56.7 -52.6 -54.8 64 -99 SPO 1997 10 31 06 28 59 3.4 -9 661.40 -56.7 -52.6 -54.8 65 -99 SPO 1997 10 31 06 29 60 3.4 -9 661.40 -56.9 -52.8 -54.8 67 -99 SPO 1997 10 31 06 30 60 3.4 -9 661.40 -56.9 -52.7 -54.8 66 -99 SPO 1997 10 31 06 31 61 3.3 -9 661.40 -56.9 -52.5 -54.8 66 -99 SPO 1997 10 31 06 32 60 3.3 -9 661.40 -56.9 -52.7 -54.8 66 -99 SPO 1997 10 31 06 33 60 3.3 -9 661.40 -56.9 -52.8 -54.9 66 -99 SPO 1997 10 31 06 34 60 3.2 -9 661.40 -56.9 -52.9 -54.9 66 -99 SPO 1997 10 31 06 35 61 3.1 -9 661.40 -56.9 -53.0 -54.9 66 -99 SPO 1997 10 31 06 36 62 3.2 -9 661.40 -56.9 -53.0 -54.9 67 -99 SPO 1997 10 31 06 37 59 3.1 -9 661.40 -56.9 -52.9 -54.9 67 -99 SPO 1997 10 31 06 38 56 3.2 -9 661.40 -56.9 -52.6 -54.9 67 -99 SPO 1997 10 31 06 39 54 3.2 -9 661.40 -56.9 -52.6 -55.0 66 -99 SPO 1997 10 31 06 40 53 3.2 -9 661.40 -56.9 -52.6 -55.2 66 -99 SPO 1997 10 31 06 41 51 3.2 -9 661.40 -56.9 -52.7 -55.3 66 -99 SPO 1997 10 31 06 42 50 3.2 -9 661.40 -56.9 -52.6 -55.4 66 -99 SPO 1997 10 31 06 43 51 3.2 -9 661.40 -56.9 -52.6 -55.4 65 -99 SPO 1997 10 31 06 44 52 3.2 -9 661.40 -56.9 -52.4 -55.4 64 -99 SPO 1997 10 31 06 45 53 3.3 -9 661.40 -57.0 -52.4 -55.3 66 -99 SPO 1997 10 31 06 46 52 3.2 -9 661.40 -57.0 -52.3 -55.2 66 -99 SPO 1997 10 31 06 47 52 3.2 -9 661.40 -57.0 -52.2 -55.2 66 -99 SPO 1997 10 31 06 48 52 3.1 -9 661.40 -56.9 -52.3 -55.3 66 -99 SPO 1997 10 31 06 49 52 3.0 -9 661.40 -56.9 -52.3 -55.2 66 -99 SPO 1997 10 31 06 50 54 2.8 -9 661.40 -56.9 -52.5 -55.0 66 -99 SPO 1997 10 31 06 51 55 2.8 -9 661.40 -57.0 -52.6 -54.8 67 -99 SPO 1997 10 31 06 52 56 2.7 -9 661.40 -56.9 -52.4 -54.7 66 -99 SPO 1997 10 31 06 53 55 2.7 -9 661.40 -57.0 -52.2 -54.7 67 -99 SPO 1997 10 31 06 54 56 2.7 -9 661.40 -57.0 -52.2 -54.7 67 -99 SPO 1997 10 31 06 55 57 2.7 -9 661.40 -57.0 -52.3 -54.7 66 -99 SPO 1997 10 31 06 56 58 2.7 -9 661.40 -57.0 -52.4 -54.7 66 -99 SPO 1997 10 31 06 57 59 2.7 -9 661.40 -57.0 -52.5 -54.7 67 -99 SPO 1997 10 31 06 58 62 2.6 -9 661.40 -57.0 -52.6 -54.7 66 -99 SPO 1997 10 31 06 59 64 2.7 -9 661.40 -57.0 -52.8 -54.8 65 -99 SPO 1997 10 31 07 00 64 2.7 -9 661.40 -57.0 -52.8 -54.8 64 0 SPO 1997 10 31 07 01 65 2.7 -9 661.40 -57.0 -53.1 -54.8 63 -99 SPO 1997 10 31 07 02 66 2.7 -9 661.40 -57.0 -53.0 -54.8 63 -99 SPO 1997 10 31 07 03 67 2.7 -9 661.40 -57.0 -53.0 -54.9 63 -99 SPO 1997 10 31 07 04 68 2.6 -9 661.40 -57.2 -53.4 -54.9 64 -99 SPO 1997 10 31 07 05 69 2.7 -9 661.40 -57.2 -53.4 -55.0 65 -99 SPO 1997 10 31 07 06 66 2.8 -9 661.40 -57.0 -53.4 -55.0 63 -99 SPO 1997 10 31 07 07 67 2.7 -9 661.40 -57.0 -53.4 -55.0 63 -99 SPO 1997 10 31 07 08 68 2.6 -9 661.40 -57.2 -53.1 -55.0 65 -99 SPO 1997 10 31 07 09 68 2.6 -9 661.50 -57.2 -53.3 -55.1 65 -99 SPO 1997 10 31 07 10 67 2.7 -9 661.40 -57.2 -53.2 -55.0 65 -99 SPO 1997 10 31 07 11 66 2.8 -9 661.40 -57.0 -52.7 -55.0 63 -99 SPO 1997 10 31 07 12 66 2.7 -9 661.40 -57.0 -52.3 -54.8 64 -99 SPO 1997 10 31 07 13 66 2.8 -9 661.40 -57.0 -51.9 -54.8 64 -99 SPO 1997 10 31 07 14 65 2.7 -9 661.40 -57.0 -51.9 -54.8 63 -99 SPO 1997 10 31 07 15 64 2.7 -9 661.40 -57.0 -52.2 -54.8 63 -99 SPO 1997 10 31 07 16 63 2.7 -9 661.40 -57.0 -52.2 -54.7 64 -99 SPO 1997 10 31 07 17 62 2.8 -9 661.40 -57.0 -52.0 -54.6 64 -99 SPO 1997 10 31 07 18 61 2.6 -9 661.40 -57.0 -51.9 -54.6 64 -99 SPO 1997 10 31 07 19 62 2.6 -9 661.40 -57.0 -51.8 -54.6 63 -99 SPO 1997 10 31 07 20 61 2.7 -9 661.40 -57.0 -51.6 -54.5 64 -99 SPO 1997 10 31 07 21 60 2.9 -9 661.40 -57.0 -51.5 -54.6 65 -99 SPO 1997 10 31 07 22 59 3.0 -9 661.40 -57.0 -51.6 -54.6 65 -99 SPO 1997 10 31 07 23 58 3.0 -9 661.40 -57.0 -51.8 -54.7 65 -99 SPO 1997 10 31 07 24 58 2.9 -9 661.40 -57.2 -51.8 -54.7 67 -99 SPO 1997 10 31 07 25 59 2.9 -9 661.40 -57.2 -51.8 -54.8 67 -99 SPO 1997 10 31 07 26 58 2.9 -9 661.40 -57.2 -51.7 -54.8 67 -99 SPO 1997 10 31 07 27 59 2.8 -9 661.40 -57.0 -51.4 -54.8 66 -99 SPO 1997 10 31 07 28 59 2.9 -9 661.40 -57.0 -51.6 -54.8 66 -99 SPO 1997 10 31 07 29 59 2.8 -9 661.40 -57.0 -51.6 -54.6 66 -99 SPO 1997 10 31 07 30 57 2.9 -9 661.40 -57.0 -51.6 -54.6 66 -99 SPO 1997 10 31 07 31 58 3.3 -9 661.40 -57.0 -51.0 -54.7 66 -99 SPO 1997 10 31 07 32 59 3.0 -9 661.40 -57.0 -50.9 -54.8 67 -99 SPO 1997 10 31 07 33 60 2.8 -9 661.40 -57.0 -51.2 -54.8 66 -99 SPO 1997 10 31 07 34 61 2.9 -9 661.40 -57.0 -51.6 -54.7 65 -99 SPO 1997 10 31 07 35 59 3.0 -9 661.40 -57.2 -51.8 -54.8 67 -99 SPO 1997 10 31 07 36 60 2.9 -9 661.40 -57.0 -51.8 -54.7 64 -99 SPO 1997 10 31 07 37 63 2.8 -9 661.40 -57.0 -51.8 -54.7 64 -99 SPO 1997 10 31 07 38 61 2.8 -9 661.40 -57.0 -52.0 -54.6 65 -99 SPO 1997 10 31 07 39 63 2.9 -9 661.40 -57.0 -52.0 -54.6 66 -99 SPO 1997 10 31 07 40 59 3.5 -9 661.40 -56.9 -51.7 -54.6 65 -99 SPO 1997 10 31 07 41 50 3.5 -9 661.50 -56.5 -51.5 -54.7 62 -99 SPO 1997 10 31 07 42 61 2.9 -9 661.40 -56.7 -51.8 -54.7 65 -99 SPO 1997 10 31 07 43 60 2.8 -9 661.50 -56.7 -52.3 -54.8 66 -99 SPO 1997 10 31 07 44 62 2.7 -9 661.50 -56.9 -52.6 -54.7 68 -99 SPO 1997 10 31 07 45 63 2.9 -9 661.50 -56.7 -52.2 -54.5 67 -99 SPO 1997 10 31 07 46 62 3.0 -9 661.50 -56.9 -51.9 -54.5 68 -99 SPO 1997 10 31 07 47 62 3.1 -9 661.50 -56.9 -51.8 -54.5 68 -99 SPO 1997 10 31 07 48 61 2.9 -9 661.50 -57.0 -52.0 -54.6 68 -99 SPO 1997 10 31 07 49 61 2.9 -9 661.50 -57.0 -52.1 -54.6 68 -99 SPO 1997 10 31 07 50 59 3.0 -9 661.50 -57.0 -52.2 -54.6 67 -99 SPO 1997 10 31 07 51 59 3.0 -9 661.50 -57.0 -52.3 -54.6 67 -99 SPO 1997 10 31 07 52 59 2.9 -9 661.50 -57.0 -52.4 -54.6 67 -99 SPO 1997 10 31 07 53 59 2.9 -9 661.50 -57.0 -52.3 -54.6 66 -99 SPO 1997 10 31 07 54 57 3.1 -9 661.50 -57.0 -52.0 -54.8 66 -99 SPO 1997 10 31 07 55 56 3.0 -9 661.50 -57.0 -52.2 -55.0 66 -99 SPO 1997 10 31 07 56 54 3.1 -9 661.50 -57.0 -52.4 -55.0 67 -99 SPO 1997 10 31 07 57 53 3.1 -9 661.50 -57.0 -52.3 -55.0 67 -99 SPO 1997 10 31 07 58 52 3.1 -9 661.50 -57.0 -52.3 -55.0 68 -99 SPO 1997 10 31 07 59 52 3.1 -9 661.50 -57.0 -52.2 -55.0 68 -99 SPO 1997 10 31 08 00 51 3.1 -9 661.50 -57.0 -52.1 -55.0 68 0 SPO 1997 10 31 08 01 52 3.1 -9 661.50 -57.0 -52.1 -55.1 68 -99 SPO 1997 10 31 08 02 51 3.2 -9 661.50 -57.0 -52.2 -55.1 68 -99 SPO 1997 10 31 08 03 51 3.2 -9 661.50 -57.0 -52.0 -55.1 68 -99 SPO 1997 10 31 08 04 50 3.2 -9 661.50 -57.0 -52.0 -55.0 68 -99 SPO 1997 10 31 08 05 50 3.1 -9 661.50 -56.9 -51.9 -55.0 68 -99 SPO 1997 10 31 08 06 51 3.1 -9 661.50 -56.9 -51.7 -55.0 68 -99 SPO 1997 10 31 08 07 52 3.1 -9 661.50 -56.9 -51.6 -54.9 68 -99 SPO 1997 10 31 08 08 51 3.2 -9 661.50 -56.9 -51.6 -54.9 68 -99 SPO 1997 10 31 08 09 50 3.3 -9 661.50 -56.9 -51.6 -55.0 67 -99 SPO 1997 10 31 08 10 50 3.2 -9 661.50 -56.9 -51.6 -55.0 66 -99 SPO 1997 10 31 08 11 50 3.2 -9 661.50 -56.9 -51.7 -55.0 66 -99 SPO 1997 10 31 08 12 49 3.2 -9 661.50 -56.9 -51.6 -55.0 66 -99 SPO 1997 10 31 08 13 49 3.2 -9 661.50 -56.9 -51.6 -55.1 66 -99 SPO 1997 10 31 08 14 47 3.3 -9 661.50 -56.9 -51.6 -55.1 67 -99 SPO 1997 10 31 08 15 46 3.3 -9 661.50 -56.9 -51.6 -55.1 68 -99 SPO 1997 10 31 08 16 45 3.3 -9 661.50 -56.9 -51.6 -55.2 68 -99 SPO 1997 10 31 08 17 45 3.2 -9 661.50 -56.9 -51.6 -55.2 68 -99 SPO 1997 10 31 08 18 44 3.2 -9 661.50 -56.9 -51.7 -55.2 67 -99 SPO 1997 10 31 08 19 44 3.0 -9 661.50 -56.9 -51.7 -55.2 67 -99 SPO 1997 10 31 08 20 44 3.1 -9 661.50 -56.9 -51.5 -55.0 67 -99 SPO 1997 10 31 08 21 44 3.1 -9 661.50 -56.9 -51.6 -55.0 68 -99 SPO 1997 10 31 08 22 43 3.2 -9 661.50 -56.9 -51.5 -55.0 68 -99 SPO 1997 10 31 08 23 42 3.2 -9 661.50 -56.9 -51.5 -55.1 67 -99 SPO 1997 10 31 08 24 42 3.2 -9 661.50 -57.0 -51.5 -55.2 68 -99 SPO 1997 10 31 08 25 41 3.3 -9 661.50 -56.9 -51.7 -55.2 67 -99 SPO 1997 10 31 08 26 41 3.4 -9 661.50 -57.0 -51.8 -55.3 67 -99 SPO 1997 10 31 08 27 40 3.5 -9 661.50 -57.0 -51.8 -55.4 67 -99 SPO 1997 10 31 08 28 42 3.5 -9 661.50 -57.0 -51.7 -55.4 66 -99 SPO 1997 10 31 08 29 42 3.6 -9 661.50 -57.0 -51.8 -55.4 66 -99 SPO 1997 10 31 08 30 41 3.6 -9 661.50 -57.0 -51.8 -55.4 66 -99 SPO 1997 10 31 08 31 42 3.5 -9 661.50 -57.0 -51.8 -55.4 66 -99 SPO 1997 10 31 08 32 43 3.6 -9 661.50 -56.9 -51.8 -55.4 66 -99 SPO 1997 10 31 08 33 43 3.6 -9 661.50 -56.9 -51.7 -55.3 66 -99 SPO 1997 10 31 08 34 42 3.6 -9 661.50 -56.9 -51.7 -55.4 67 -99 SPO 1997 10 31 08 35 43 3.6 -9 661.50 -56.9 -51.8 -55.4 67 -99 SPO 1997 10 31 08 36 43 3.7 -9 661.40 -56.9 -51.8 -55.4 67 -99 SPO 1997 10 31 08 37 42 3.7 -9 661.50 -56.9 -51.8 -55.3 68 -99 SPO 1997 10 31 08 38 42 3.7 -9 661.40 -56.9 -51.8 -55.3 68 -99 SPO 1997 10 31 08 39 42 3.7 -9 661.40 -56.9 -51.8 -55.3 68 -99 SPO 1997 10 31 08 40 42 3.7 -9 661.40 -56.9 -51.8 -55.4 68 -99 SPO 1997 10 31 08 41 42 3.7 -9 661.40 -56.9 -51.8 -55.3 68 -99 SPO 1997 10 31 08 42 43 3.7 -9 661.50 -56.9 -51.8 -55.3 67 -99 SPO 1997 10 31 08 43 42 3.7 -9 661.50 -56.9 -51.9 -55.4 66 -99 SPO 1997 10 31 08 44 42 3.7 -9 661.50 -56.9 -51.9 -55.4 66 -99 SPO 1997 10 31 08 45 41 3.8 -9 661.50 -56.9 -51.9 -55.4 64 -99 SPO 1997 10 31 08 46 41 3.8 -9 661.40 -56.9 -51.8 -55.5 65 -99 SPO 1997 10 31 08 47 42 3.8 -9 661.40 -56.9 -51.8 -55.5 65 -99 SPO 1997 10 31 08 48 43 3.8 -9 661.40 -56.7 -51.8 -55.4 64 -99 SPO 1997 10 31 08 49 44 3.7 -9 661.40 -56.7 -51.8 -55.5 64 -99 SPO 1997 10 31 08 50 44 3.7 -9 661.40 -56.7 -51.8 -55.4 65 -99 SPO 1997 10 31 08 51 45 3.6 -9 661.40 -56.9 -51.8 -55.4 67 -99 SPO 1997 10 31 08 52 45 3.6 -9 661.40 -56.9 -51.8 -55.4 67 -99 SPO 1997 10 31 08 53 47 3.4 -9 661.40 -56.7 -51.8 -55.2 65 -99 SPO 1997 10 31 08 54 47 3.4 -9 661.40 -56.7 -52.0 -55.1 65 -99 SPO 1997 10 31 08 55 47 3.4 -9 661.40 -56.7 -52.1 -55.1 65 -99 SPO 1997 10 31 08 56 47 3.6 -9 661.40 -56.7 -52.2 -55.2 65 -99 SPO 1997 10 31 08 57 47 3.6 -9 661.40 -56.7 -52.2 -55.2 64 -99 SPO 1997 10 31 08 58 48 3.6 -9 661.40 -56.7 -52.1 -55.2 64 -99 SPO 1997 10 31 08 59 48 3.7 -9 661.40 -56.7 -52.0 -55.4 64 -99 SPO 1997 10 31 09 00 47 3.8 -9 661.40 -56.7 -51.9 -55.4 64 0 SPO 1997 10 31 09 01 47 3.8 -9 661.40 -56.7 -51.9 -55.4 65 -99 SPO 1997 10 31 09 02 47 3.7 -9 661.40 -56.7 -51.9 -55.4 65 -99 SPO 1997 10 31 09 03 47 3.7 -9 661.40 -56.7 -51.9 -55.4 66 -99 SPO 1997 10 31 09 04 47 3.7 -9 661.40 -56.7 -51.9 -55.4 66 -99 SPO 1997 10 31 09 05 46 3.8 -9 661.40 -56.7 -52.0 -55.6 66 -99 SPO 1997 10 31 09 06 44 3.9 -9 661.40 -56.7 -52.0 -55.6 66 -99 SPO 1997 10 31 09 07 43 3.8 -9 661.40 -56.7 -52.0 -55.6 66 -99 SPO 1997 10 31 09 08 43 3.8 -9 661.30 -56.7 -52.0 -55.6 66 -99 SPO 1997 10 31 09 09 42 3.8 -9 661.30 -56.7 -52.1 -55.6 66 -99 SPO 1997 10 31 09 10 41 3.8 -9 661.30 -56.7 -52.1 -55.6 66 -99 SPO 1997 10 31 09 11 40 3.8 -9 661.30 -56.7 -51.9 -55.7 66 -99 SPO 1997 10 31 09 12 40 3.8 -9 661.30 -56.7 -52.0 -55.6 65 -99 SPO 1997 10 31 09 13 40 3.8 -9 661.30 -56.5 -52.0 -55.6 64 -99 SPO 1997 10 31 09 14 40 3.8 -9 661.30 -56.5 -52.0 -55.6 64 -99 SPO 1997 10 31 09 15 39 3.8 -9 661.30 -56.5 -52.0 -55.6 64 -99 SPO 1997 10 31 09 16 39 3.8 -9 661.30 -56.5 -51.9 -55.6 64 -99 SPO 1997 10 31 09 17 38 3.8 -9 661.30 -56.5 -52.0 -55.7 64 -99 SPO 1997 10 31 09 18 37 3.9 -9 661.30 -56.5 -51.8 -55.7 65 -99 SPO 1997 10 31 09 19 37 3.9 -9 661.30 -56.5 -51.7 -55.7 65 -99 SPO 1997 10 31 09 20 37 3.9 -9 661.40 -56.5 -51.8 -55.6 65 -99 SPO 1997 10 31 09 21 37 3.9 -9 661.40 -56.5 -52.0 -55.6 65 -99 SPO 1997 10 31 09 22 37 3.8 -9 661.40 -56.5 -52.1 -55.6 65 -99 SPO 1997 10 31 09 23 36 3.8 -9 661.40 -56.5 -52.1 -55.6 64 -99 SPO 1997 10 31 09 24 35 3.9 -9 661.40 -56.5 -52.1 -55.6 64 -99 SPO 1997 10 31 09 25 35 3.8 -9 661.40 -56.5 -52.0 -55.6 64 -99 SPO 1997 10 31 09 26 35 3.9 -9 661.40 -56.5 -51.8 -55.6 64 -99 SPO 1997 10 31 09 27 35 3.9 -9 661.40 -56.5 -51.8 -55.6 64 -99 SPO 1997 10 31 09 28 35 3.9 -9 661.40 -56.5 -51.8 -55.6 64 -99 SPO 1997 10 31 09 29 34 3.9 -9 661.40 -56.5 -51.8 -55.5 64 -99 SPO 1997 10 31 09 30 34 3.9 -9 661.40 -56.4 -51.8 -55.5 64 -99 SPO 1997 10 31 09 31 34 3.8 -9 661.40 -56.2 -51.8 -55.4 64 -99 SPO 1997 10 31 09 32 34 3.8 -9 661.40 -56.4 -51.8 -55.4 65 -99 SPO 1997 10 31 09 33 34 3.7 -9 661.40 -56.4 -51.8 -55.3 66 -99 SPO 1997 10 31 09 34 35 3.7 -9 661.40 -56.2 -51.8 -55.3 65 -99 SPO 1997 10 31 09 35 34 3.7 -9 661.40 -56.2 -51.8 -55.2 65 -99 SPO 1997 10 31 09 36 35 3.7 -9 661.40 -56.0 -51.8 -55.2 65 -99 SPO 1997 10 31 09 37 35 3.7 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 38 36 3.5 -9 661.40 -56.0 -51.6 -55.1 65 -99 SPO 1997 10 31 09 39 37 3.5 -9 661.40 -56.0 -51.6 -55.1 65 -99 SPO 1997 10 31 09 40 37 3.6 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 41 37 3.6 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 42 37 3.8 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 43 37 3.9 -9 661.40 -56.0 -51.7 -55.1 65 -99 SPO 1997 10 31 09 44 37 3.9 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 45 37 3.9 -9 661.30 -56.0 -51.7 -55.1 65 -99 SPO 1997 10 31 09 46 37 3.9 -9 661.30 -56.0 -51.8 -55.2 65 -99 SPO 1997 10 31 09 47 37 4.0 -9 661.40 -56.0 -51.7 -55.2 65 -99 SPO 1997 10 31 09 48 37 3.9 -9 661.40 -56.0 -51.7 -55.1 65 -99 SPO 1997 10 31 09 49 37 3.8 -9 661.40 -56.0 -51.8 -55.1 65 -99 SPO 1997 10 31 09 50 37 3.8 -9 661.30 -55.9 -51.8 -55.0 66 -99 SPO 1997 10 31 09 51 37 3.9 -9 661.30 -55.9 -51.8 -55.0 66 -99 SPO 1997 10 31 09 52 36 4.0 -9 661.30 -55.9 -51.7 -55.0 66 -99 SPO 1997 10 31 09 53 37 3.8 -9 661.30 -55.9 -51.6 -55.0 67 -99 SPO 1997 10 31 09 54 37 3.9 -9 661.30 -55.9 -51.6 -55.0 66 -99 SPO 1997 10 31 09 55 36 3.9 -9 661.30 -55.9 -51.5 -55.0 66 -99 SPO 1997 10 31 09 56 36 3.9 -9 661.30 -55.9 -51.6 -55.0 65 -99 SPO 1997 10 31 09 57 36 3.9 -9 661.30 -55.9 -51.6 -55.0 65 -99 SPO 1997 10 31 09 58 36 3.9 -9 661.30 -55.7 -51.5 -54.9 63 -99 SPO 1997 10 31 09 59 36 3.7 -9 661.30 -55.7 -51.6 -54.9 63 -99 SPO 1997 10 31 10 00 37 3.7 -9 661.30 -55.7 -51.7 -54.9 64 0 SPO 1997 10 31 10 01 37 3.7 -9 661.30 -55.7 -51.6 -54.9 65 -99 SPO 1997 10 31 10 02 38 3.7 -9 661.30 -55.7 -51.5 -54.9 65 -99 SPO 1997 10 31 10 03 39 3.7 -9 661.30 -55.7 -51.6 -54.8 65 -99 SPO 1997 10 31 10 04 40 3.6 -9 661.30 -55.7 -51.7 -54.8 65 -99 SPO 1997 10 31 10 05 41 3.6 -9 661.30 -55.7 -51.8 -54.8 66 -99 SPO 1997 10 31 10 06 42 3.5 -9 661.30 -55.7 -51.9 -54.8 65 -99 SPO 1997 10 31 10 07 43 3.5 -9 661.40 -55.7 -51.8 -54.8 65 -99 SPO 1997 10 31 10 08 43 3.4 -9 661.40 -55.7 -52.1 -54.8 65 -99 SPO 1997 10 31 10 09 43 3.5 -9 661.40 -55.7 -52.1 -54.7 65 -99 SPO 1997 10 31 10 10 42 3.5 -9 661.40 -55.7 -52.2 -54.7 65 -99 SPO 1997 10 31 10 11 41 3.5 -9 661.30 -55.7 -52.2 -54.8 65 -99 SPO 1997 10 31 10 12 42 3.7 -9 661.30 -55.7 -52.1 -54.8 65 -99 SPO 1997 10 31 10 13 42 3.6 -9 661.30 -55.7 -52.0 -54.8 65 -99 SPO 1997 10 31 10 14 43 3.6 -9 661.30 -55.9 -52.2 -54.9 67 -99 SPO 1997 10 31 10 15 43 3.6 -9 661.40 -55.9 -52.4 -54.9 67 -99 SPO 1997 10 31 10 16 42 3.7 -9 661.40 -55.9 -52.5 -54.9 67 -99 SPO 1997 10 31 10 17 42 3.7 -9 661.30 -55.9 -52.2 -55.0 66 -99 SPO 1997 10 31 10 18 41 3.7 -9 661.30 -55.9 -52.1 -55.0 65 -99 SPO 1997 10 31 10 19 41 3.7 -9 661.30 -55.9 -52.1 -55.0 65 -99 SPO 1997 10 31 10 20 41 3.6 -9 661.30 -55.7 -52.1 -55.0 64 -99 SPO 1997 10 31 10 21 40 3.6 -9 661.30 -55.7 -52.4 -55.0 64 -99 SPO 1997 10 31 10 22 40 3.6 -9 661.30 -55.7 -52.4 -55.0 65 -99 SPO 1997 10 31 10 23 41 3.5 -9 661.30 -55.7 -52.4 -55.0 65 -99 SPO 1997 10 31 10 24 41 3.4 -9 661.30 -55.7 -52.6 -55.0 65 -99 SPO 1997 10 31 10 25 40 3.4 -9 661.30 -55.7 -52.7 -55.0 64 -99 SPO 1997 10 31 10 26 39 3.3 -9 661.30 -55.7 -52.7 -54.9 65 -99 SPO 1997 10 31 10 27 38 3.4 -9 661.30 -55.7 -52.5 -54.8 65 -99 SPO 1997 10 31 10 28 38 3.4 -9 661.30 -55.7 -52.3 -54.8 65 -99 SPO 1997 10 31 10 29 38 3.4 -9 661.30 -55.7 -52.3 -54.8 65 -99 SPO 1997 10 31 10 30 38 3.4 -9 661.30 -55.5 -52.3 -54.8 65 -99 SPO 1997 10 31 10 31 38 3.4 -9 661.30 -55.5 -52.3 -54.7 65 -99 SPO 1997 10 31 10 32 37 3.4 -9 661.30 -55.5 -52.3 -54.6 65 -99 SPO 1997 10 31 10 33 38 3.3 -9 661.30 -55.5 -52.2 -54.6 65 -99 SPO 1997 10 31 10 34 38 3.3 -9 661.30 -55.5 -52.2 -54.6 66 -99 SPO 1997 10 31 10 35 39 3.2 -9 661.30 -55.5 -52.3 -54.6 66 -99 SPO 1997 10 31 10 36 41 3.2 -9 661.30 -55.5 -52.4 -54.6 66 -99 SPO 1997 10 31 10 37 42 3.1 -9 661.30 -55.5 -52.4 -54.5 67 -99 SPO 1997 10 31 10 38 42 3.1 -9 661.30 -55.5 -52.4 -54.5 66 -99 SPO 1997 10 31 10 39 42 3.1 -9 661.30 -55.5 -52.4 -54.5 65 -99 SPO 1997 10 31 10 40 42 3.1 -9 661.30 -55.5 -52.4 -54.5 65 -99 SPO 1997 10 31 10 41 43 3.1 -9 661.40 -55.5 -52.5 -54.5 65 -99 SPO 1997 10 31 10 42 44 3.1 -9 661.40 -55.5 -52.6 -54.4 65 -99 SPO 1997 10 31 10 43 46 3.0 -9 661.40 -55.5 -52.7 -54.4 65 -99 SPO 1997 10 31 10 44 47 2.9 -9 661.40 -55.5 -53.0 -54.3 66 -99 SPO 1997 10 31 10 45 46 3.0 -9 661.40 -55.7 -53.1 -54.3 68 -99 SPO 1997 10 31 10 46 47 2.9 -9 661.40 -55.7 -53.2 -54.3 68 -99 SPO 1997 10 31 10 47 47 2.8 -9 661.40 -55.7 -53.3 -54.2 68 -99 SPO 1997 10 31 10 48 48 2.8 -9 661.40 -55.7 -53.4 -54.1 67 -99 SPO 1997 10 31 10 49 48 2.7 -9 661.50 -55.7 -53.5 -54.0 67 -99 SPO 1997 10 31 10 50 50 2.7 -9 661.50 -55.9 -53.5 -53.8 68 -99 SPO 1997 10 31 10 51 51 2.7 -9 661.50 -56.0 -53.4 -53.7 69 -99 SPO 1997 10 31 10 52 51 2.6 -9 661.50 -56.0 -53.6 -53.6 68 -99 SPO 1997 10 31 10 53 51 2.5 -9 661.50 -56.0 -53.7 -53.6 67 -99 SPO 1997 10 31 10 54 53 2.4 -9 661.50 -56.2 -53.7 -53.6 69 -99 SPO 1997 10 31 10 55 53 2.4 -9 661.50 -56.2 -53.8 -53.6 67 -99 SPO 1997 10 31 10 56 53 2.3 -9 661.50 -56.4 -54.0 -53.7 67 -99 SPO 1997 10 31 10 57 53 2.3 -9 661.50 -56.4 -54.0 -53.8 66 -99 SPO 1997 10 31 10 58 51 2.4 -9 661.50 -56.5 -54.0 -53.8 66 -99 SPO 1997 10 31 10 59 49 2.5 -9 661.50 -56.4 -53.9 -53.8 64 -99 SPO 1997 10 31 11 00 49 2.4 -9 661.50 -56.5 -53.9 -53.8 65 0 SPO 1997 10 31 11 01 49 2.3 -9 661.50 -56.5 -53.9 -53.9 65 -99 SPO 1997 10 31 11 02 49 2.3 -9 661.50 -56.5 -53.9 -53.9 65 -99 SPO 1997 10 31 11 03 49 2.2 -9 661.50 -56.5 -53.9 -53.9 65 -99 SPO 1997 10 31 11 04 49 2.2 -9 661.50 -56.5 -53.8 -53.9 65 -99 SPO 1997 10 31 11 05 49 2.2 -9 661.50 -56.5 -53.8 -53.9 65 -99 SPO 1997 10 31 11 06 49 2.2 -9 661.50 -56.5 -53.8 -53.9 65 -99 SPO 1997 10 31 11 07 49 2.2 -9 661.50 -56.5 -53.9 -54.0 65 -99 SPO 1997 10 31 11 08 48 2.3 -9 661.50 -56.5 -53.9 -54.1 65 -99 SPO 1997 10 31 11 09 47 2.2 -9 661.50 -56.7 -53.9 -54.1 67 -99 SPO 1997 10 31 11 10 47 2.2 -9 661.50 -56.7 -53.9 -54.2 66 -99 SPO 1997 10 31 11 11 48 2.3 -9 661.50 -56.7 -53.9 -54.2 66 -99 SPO 1997 10 31 11 12 48 2.3 -9 661.50 -56.7 -53.9 -54.3 66 -99 SPO 1997 10 31 11 13 49 2.2 -9 661.50 -56.7 -54.0 -54.3 65 -99 SPO 1997 10 31 11 14 51 2.2 -9 661.50 -56.7 -54.0 -54.3 64 -99 SPO 1997 10 31 11 15 52 2.1 -9 661.50 -56.9 -54.0 -54.4 64 -99 SPO 1997 10 31 11 16 54 2.1 -9 661.50 -56.9 -54.0 -54.5 63 -99 SPO 1997 10 31 11 17 54 2.2 -9 661.50 -56.9 -53.9 -54.6 64 -99 SPO 1997 10 31 11 18 52 2.4 -9 661.50 -56.9 -53.9 -54.6 64 -99 SPO 1997 10 31 11 19 51 2.5 -9 661.50 -56.9 -53.8 -54.7 65 -99 SPO 1997 10 31 11 20 50 2.6 -9 661.50 -57.0 -53.8 -54.7 66 -99 SPO 1997 10 31 11 21 49 2.6 -9 661.50 -56.9 -53.8 -54.8 65 -99 SPO 1997 10 31 11 22 51 2.5 -9 661.50 -56.9 -53.9 -54.8 66 -99 SPO 1997 10 31 11 23 50 2.5 -9 661.50 -56.9 -53.9 -54.7 66 -99 SPO 1997 10 31 11 24 51 2.4 -9 661.50 -56.9 -53.8 -54.7 66 -99 SPO 1997 10 31 11 25 51 2.4 -9 661.50 -56.9 -53.8 -54.6 66 -99 SPO 1997 10 31 11 26 51 2.4 -9 661.50 -56.7 -53.9 -54.6 64 -99 SPO 1997 10 31 11 27 52 2.4 -9 661.50 -56.7 -53.9 -54.6 65 -99 SPO 1997 10 31 11 28 51 2.5 -9 661.50 -56.7 -53.9 -54.6 65 -99 SPO 1997 10 31 11 29 50 2.5 -9 661.50 -56.7 -53.9 -54.7 66 -99 SPO 1997 10 31 11 30 49 2.5 -9 661.50 -56.7 -53.8 -54.7 66 -99 SPO 1997 10 31 11 31 48 2.4 -9 661.50 -56.7 -53.8 -54.6 66 -99 SPO 1997 10 31 11 32 47 2.4 -9 661.50 -56.7 -53.7 -54.6 66 -99 SPO 1997 10 31 11 33 45 2.5 -9 661.50 -56.7 -53.7 -54.7 66 -99 SPO 1997 10 31 11 34 43 2.5 -9 661.50 -56.7 -53.6 -54.8 66 -99 SPO 1997 10 31 11 35 42 2.5 -9 661.50 -56.7 -53.5 -54.9 66 -99 SPO 1997 10 31 11 36 44 2.6 -9 661.50 -56.7 -53.5 -54.9 67 -99 SPO 1997 10 31 11 37 44 2.7 -9 661.50 -56.7 -53.5 -54.9 67 -99 SPO 1997 10 31 11 38 45 2.7 -9 661.50 -56.7 -53.6 -55.0 68 -99 SPO 1997 10 31 11 39 44 2.8 -9 661.50 -56.7 -53.5 -55.0 68 -99 SPO 1997 10 31 11 40 44 2.9 -9 661.50 -56.7 -53.5 -55.1 68 -99 SPO 1997 10 31 11 41 45 2.9 -9 661.50 -56.7 -53.5 -55.1 68 -99 SPO 1997 10 31 11 42 45 3.0 -9 661.50 -56.7 -53.6 -55.1 68 -99 SPO 1997 10 31 11 43 46 3.0 -9 661.50 -56.7 -53.6 -55.1 68 -99 SPO 1997 10 31 11 44 46 3.0 -9 661.50 -56.7 -53.5 -55.1 68 -99 SPO 1997 10 31 11 45 45 3.0 -9 661.50 -56.5 -53.5 -55.2 67 -99 SPO 1997 10 31 11 46 44 3.1 -9 661.50 -56.5 -53.5 -55.2 66 -99 SPO 1997 10 31 11 47 44 3.1 -9 661.50 -56.5 -53.6 -55.2 66 -99 SPO 1997 10 31 11 48 43 3.1 -9 661.50 -56.5 -53.6 -55.1 66 -99 SPO 1997 10 31 11 49 42 3.1 -9 661.50 -56.5 -53.5 -55.1 67 -99 SPO 1997 10 31 11 50 41 3.0 -9 661.50 -56.5 -53.6 -55.1 66 -99 SPO 1997 10 31 11 51 41 3.1 -9 661.50 -56.5 -53.6 -55.2 66 -99 SPO 1997 10 31 11 52 41 3.1 -9 661.50 -56.5 -53.6 -55.2 66 -99 SPO 1997 10 31 11 53 42 3.1 -9 661.50 -56.5 -53.5 -55.2 66 -99 SPO 1997 10 31 11 54 42 3.1 -9 661.50 -56.5 -53.5 -55.2 66 -99 SPO 1997 10 31 11 55 43 3.1 -9 661.50 -56.5 -53.4 -55.2 67 -99 SPO 1997 10 31 11 56 43 3.1 -9 661.50 -56.5 -53.5 -55.2 68 -99 SPO 1997 10 31 11 57 43 3.1 -9 661.50 -56.5 -53.5 -55.2 68 -99 SPO 1997 10 31 11 58 42 3.1 -9 661.50 -56.5 -53.5 -55.2 68 -99 SPO 1997 10 31 11 59 42 3.2 -9 661.50 -56.5 -53.5 -55.3 68 -99 SPO 1997 10 31 12 00 41 3.3 -9 661.50 -56.5 -53.3 -55.3 68 0 SPO 1997 10 31 12 01 41 3.4 -9 661.50 -56.5 -53.2 -55.4 68 -99 SPO 1997 10 31 12 02 40 3.5 -9 661.50 -56.5 -53.1 -55.4 68 -99 SPO 1997 10 31 12 03 40 3.5 -9 661.50 -56.5 -52.9 -55.5 68 -99 SPO 1997 10 31 12 04 39 3.5 -9 661.50 -56.4 -52.9 -55.5 67 -99 SPO 1997 10 31 12 05 38 3.5 -9 661.50 -56.4 -52.9 -55.5 66 -99 SPO 1997 10 31 12 06 37 3.6 -9 661.50 -56.4 -53.0 -55.5 66 -99 SPO 1997 10 31 12 07 37 3.7 -9 661.50 -56.4 -53.0 -55.5 65 -99 SPO 1997 10 31 12 08 37 3.8 -9 661.50 -56.4 -53.0 -55.5 64 -99 SPO 1997 10 31 12 09 37 3.8 -9 661.50 -56.2 -52.9 -55.5 63 -99 SPO 1997 10 31 12 10 36 3.9 -9 661.50 -56.2 -52.8 -55.5 63 -99 SPO 1997 10 31 12 11 36 3.9 -9 661.50 -56.2 -52.8 -55.4 64 -99 SPO 1997 10 31 12 12 36 3.8 -9 661.50 -56.2 -52.8 -55.4 64 -99 SPO 1997 10 31 12 13 36 3.8 -9 661.50 -56.2 -52.8 -55.4 65 -99 SPO 1997 10 31 12 14 36 3.8 -9 661.50 -56.0 -52.9 -55.3 64 -99 SPO 1997 10 31 12 15 35 3.9 -9 661.50 -56.0 -52.9 -55.3 65 -99 SPO 1997 10 31 12 16 34 4.0 -9 661.50 -56.0 -52.9 -55.3 65 -99 SPO 1997 10 31 12 17 34 4.0 -9 661.50 -56.0 -53.0 -55.2 65 -99 SPO 1997 10 31 12 18 35 4.0 -9 661.50 -56.0 -53.1 -55.2 65 -99 SPO 1997 10 31 12 19 36 3.7 -9 661.50 -56.0 -53.0 -55.2 66 -99 SPO 1997 10 31 12 20 37 3.6 -9 661.50 -56.0 -53.1 -55.2 66 -99 SPO 1997 10 31 12 21 37 3.4 -9 661.50 -56.0 -53.2 -55.1 66 -99 SPO 1997 10 31 12 22 38 3.4 -9 661.50 -55.9 -53.1 -55.1 65 -99 SPO 1997 10 31 12 23 38 3.4 -9 661.50 -55.9 -53.2 -55.1 65 -99 SPO 1997 10 31 12 24 37 3.4 -9 661.50 -55.7 -53.2 -55.1 63 -99 SPO 1997 10 31 12 25 36 3.5 -9 661.50 -55.7 -53.2 -55.1 63 -99 SPO 1997 10 31 12 26 35 3.5 -9 661.50 -55.7 -53.2 -55.1 64 -99 SPO 1997 10 31 12 27 36 3.5 -9 661.50 -55.7 -53.2 -55.1 65 -99 SPO 1997 10 31 12 28 35 3.4 -9 661.50 -55.7 -53.2 -55.1 65 -99 SPO 1997 10 31 12 29 34 3.5 -9 661.50 -55.7 -53.2 -55.1 65 -99 SPO 1997 10 31 12 30 35 3.3 -9 661.50 -55.7 -53.1 -55.0 65 -99 SPO 1997 10 31 12 31 33 3.3 -9 661.50 -55.7 -53.1 -55.0 65 -99 SPO 1997 10 31 12 32 34 3.3 -9 661.50 -55.7 -53.1 -55.0 65 -99 SPO 1997 10 31 12 33 35 3.3 -9 661.50 -55.7 -53.0 -55.0 65 -99 SPO 1997 10 31 12 34 36 3.2 -9 661.50 -55.7 -53.0 -55.0 65 -99 SPO 1997 10 31 12 35 36 3.1 -9 661.50 -55.7 -53.0 -55.0 65 -99 SPO 1997 10 31 12 36 36 3.0 -9 661.50 -55.9 -53.1 -54.9 66 -99 SPO 1997 10 31 12 37 36 3.0 -9 661.50 -55.7 -53.1 -54.8 65 -99 SPO 1997 10 31 12 38 36 3.0 -9 661.50 -55.7 -53.1 -54.8 65 -99 SPO 1997 10 31 12 39 36 3.2 -9 661.50 -55.9 -53.1 -54.8 66 -99 SPO 1997 10 31 12 40 37 3.2 -9 661.50 -55.9 -53.2 -54.9 67 -99 SPO 1997 10 31 12 41 38 3.2 -9 661.50 -56.0 -53.2 -54.9 68 -99 SPO 1997 10 31 12 42 39 3.1 -9 661.50 -56.0 -53.2 -54.9 68 -99 SPO 1997 10 31 12 43 39 3.1 -9 661.50 -56.0 -53.2 -54.9 68 -99 SPO 1997 10 31 12 44 39 3.2 -9 661.50 -56.2 -53.2 -55.0 69 -99 SPO 1997 10 31 12 45 38 3.3 -9 661.50 -56.2 -53.2 -55.0 69 -99 SPO 1997 10 31 12 46 37 3.4 -9 661.50 -56.0 -53.0 -55.1 66 -99 SPO 1997 10 31 12 47 36 3.5 -9 661.50 -56.2 -53.0 -55.2 68 -99 SPO 1997 10 31 12 48 37 3.5 -9 661.50 -56.2 -53.1 -55.2 67 -99 SPO 1997 10 31 12 49 38 3.5 -9 661.50 -56.2 -53.0 -55.3 67 -99 SPO 1997 10 31 12 50 37 3.5 -9 661.50 -56.2 -53.0 -55.3 66 -99 SPO 1997 10 31 12 51 37 3.5 -9 661.50 -56.2 -53.0 -55.4 65 -99 SPO 1997 10 31 12 52 36 3.5 -9 661.50 -56.2 -53.1 -55.4 64 -99 SPO 1997 10 31 12 53 35 3.6 -9 661.50 -56.2 -53.1 -55.4 64 -99 SPO 1997 10 31 12 54 35 3.7 -9 661.50 -56.2 -53.0 -55.4 63 -99 SPO 1997 10 31 12 55 35 3.6 -9 661.50 -56.2 -53.0 -55.4 64 -99 SPO 1997 10 31 12 56 36 3.5 -9 661.50 -56.2 -53.0 -55.4 64 -99 SPO 1997 10 31 12 57 37 3.5 -9 661.50 -56.2 -53.0 -55.4 64 -99 SPO 1997 10 31 12 58 37 3.6 -9 661.50 -56.2 -52.9 -55.4 64 -99 SPO 1997 10 31 12 59 38 3.5 -9 661.50 -56.4 -52.9 -55.4 66 -99 SPO 1997 10 31 13 00 37 3.5 -9 661.50 -56.4 -52.8 -55.4 65 0 SPO 1997 10 31 13 01 37 3.7 -9 661.50 -56.4 -53.0 -55.4 65 -99 SPO 1997 10 31 13 02 37 3.5 -9 661.50 -56.5 -53.2 -55.4 66 -99 SPO 1997 10 31 13 03 39 3.4 -9 661.50 -56.5 -53.1 -55.4 65 -99 SPO 1997 10 31 13 04 39 3.3 -9 661.50 -56.5 -53.0 -55.4 66 -99 SPO 1997 10 31 13 05 39 3.4 -9 661.50 -56.5 -52.9 -55.4 66 -99 SPO 1997 10 31 13 06 38 3.3 -9 661.50 -56.5 -53.0 -55.4 65 -99 SPO 1997 10 31 13 07 39 3.3 -9 661.50 -56.5 -52.9 -55.4 64 -99 SPO 1997 10 31 13 08 38 3.3 -9 661.50 -56.5 -53.0 -55.4 64 -99 SPO 1997 10 31 13 09 38 3.3 -9 661.50 -56.5 -52.9 -55.4 64 -99 SPO 1997 10 31 13 10 38 3.2 -9 661.50 -56.5 -53.0 -55.4 64 -99 SPO 1997 10 31 13 11 37 3.3 -9 661.50 -56.5 -53.0 -55.4 64 -99 SPO 1997 10 31 13 12 37 3.3 -9 661.50 -56.5 -53.0 -55.4 64 -99 SPO 1997 10 31 13 13 36 3.3 -9 661.50 -56.5 -52.9 -55.3 64 -99 SPO 1997 10 31 13 14 37 3.3 -9 661.50 -56.4 -52.8 -55.3 64 -99 SPO 1997 10 31 13 15 37 3.3 -9 661.50 -56.4 -52.8 -55.3 65 -99 SPO 1997 10 31 13 16 37 3.4 -9 661.50 -56.4 -52.7 -55.3 65 -99 SPO 1997 10 31 13 17 37 3.5 -9 661.50 -56.2 -52.7 -55.3 64 -99 SPO 1997 10 31 13 18 37 3.6 -9 661.50 -56.2 -52.6 -55.4 64 -99 SPO 1997 10 31 13 19 37 3.6 -9 661.40 -56.2 -52.7 -55.4 64 -99 SPO 1997 10 31 13 20 37 3.6 -9 661.40 -56.2 -52.7 -55.3 65 -99 SPO 1997 10 31 13 21 37 3.6 -9 661.40 -56.2 -52.7 -55.3 65 -99 SPO 1997 10 31 13 22 38 3.5 -9 661.40 -56.2 -52.8 -55.2 66 -99 SPO 1997 10 31 13 23 39 3.4 -9 661.40 -56.2 -52.9 -55.1 66 -99 SPO 1997 10 31 13 24 40 3.4 -9 661.40 -56.2 -52.9 -55.1 65 -99 SPO 1997 10 31 13 25 40 3.4 -9 661.40 -56.2 -53.0 -55.1 65 -99 SPO 1997 10 31 13 26 39 3.4 -9 661.50 -56.2 -53.0 -55.1 65 -99 SPO 1997 10 31 13 27 38 3.4 -9 661.50 -56.2 -53.2 -55.1 65 -99 SPO 1997 10 31 13 28 38 3.5 -9 661.50 -56.2 -53.2 -55.1 66 -99 SPO 1997 10 31 13 29 38 3.5 -9 661.50 -56.0 -53.2 -55.1 65 -99 SPO 1997 10 31 13 30 38 3.5 -9 661.50 -56.0 -53.2 -55.1 65 -99 SPO 1997 10 31 13 31 37 3.4 -9 661.50 -56.0 -53.3 -55.0 65 -99 SPO 1997 10 31 13 32 36 3.4 -9 661.50 -55.9 -53.3 -55.0 65 -99 SPO 1997 10 31 13 33 36 3.5 -9 661.50 -55.7 -53.2 -54.9 65 -99 SPO 1997 10 31 13 34 35 3.5 -9 661.50 -55.7 -53.2 -54.8 65 -99 SPO 1997 10 31 13 35 35 3.4 -9 661.50 -55.5 -53.2 -54.8 65 -99 SPO 1997 10 31 13 36 35 3.4 -9 661.50 -55.5 -53.2 -54.8 65 -99 SPO 1997 10 31 13 37 35 3.4 -9 661.50 -55.5 -53.2 -54.7 65 -99 SPO 1997 10 31 13 38 34 3.4 -9 661.50 -55.5 -53.1 -54.6 66 -99 SPO 1997 10 31 13 39 34 3.4 -9 661.50 -55.5 -53.1 -54.6 65 -99 SPO 1997 10 31 13 40 34 3.2 -9 661.50 -55.4 -53.0 -54.6 65 -99 SPO 1997 10 31 13 41 34 3.1 -9 661.50 -55.2 -53.2 -54.6 63 -99 SPO 1997 10 31 13 42 35 3.0 -9 661.50 -55.4 -53.2 -54.6 65 -99 SPO 1997 10 31 13 43 35 3.0 -9 661.50 -55.4 -53.3 -54.5 65 -99 SPO 1997 10 31 13 44 36 3.0 -9 661.50 -55.4 -53.2 -54.5 65 -99 SPO 1997 10 31 13 45 36 3.0 -9 661.50 -55.4 -53.3 -54.4 66 -99 SPO 1997 10 31 13 46 36 3.0 -9 661.50 -55.4 -53.3 -54.4 66 -99 SPO 1997 10 31 13 47 35 3.1 -9 661.50 -55.4 -53.3 -54.4 67 -99 SPO 1997 10 31 13 48 35 3.1 -9 661.50 -55.4 -53.2 -54.4 67 -99 SPO 1997 10 31 13 49 36 3.0 -9 661.50 -55.4 -53.2 -54.4 67 -99 SPO 1997 10 31 13 50 36 2.9 -9 661.50 -55.4 -53.2 -54.4 66 -99 SPO 1997 10 31 13 51 37 2.8 -9 661.50 -55.5 -53.3 -54.3 67 -99 SPO 1997 10 31 13 52 38 2.8 -9 661.50 -55.5 -53.3 -54.2 66 -99 SPO 1997 10 31 13 53 38 2.9 -9 661.50 -55.5 -53.3 -54.2 66 -99 SPO 1997 10 31 13 54 38 3.0 -9 661.50 -55.5 -53.3 -54.3 66 -99 SPO 1997 10 31 13 55 37 3.0 -9 661.50 -55.7 -53.2 -54.3 67 -99 SPO 1997 10 31 13 56 37 3.0 -9 661.50 -55.7 -53.3 -54.4 66 -99 SPO 1997 10 31 13 57 37 3.0 -9 661.50 -55.9 -53.3 -54.4 67 -99 SPO 1997 10 31 13 58 39 2.9 -9 661.50 -56.2 -53.3 -54.4 68 -99 SPO 1997 10 31 13 59 39 3.0 -9 661.50 -56.4 -53.4 -54.4 68 -99 SPO 1997 10 31 14 00 40 3.0 -9 661.50 -56.4 -53.4 -54.4 67 0 SPO 1997 10 31 14 01 41 3.0 -9 661.50 -56.5 -53.4 -54.4 66 -99 SPO 1997 10 31 14 02 42 3.1 -9 661.50 -56.5 -53.5 -54.5 65 -99 SPO 1997 10 31 14 03 42 3.1 -9 661.50 -56.7 -53.5 -54.6 67 -99 SPO 1997 10 31 14 04 42 3.1 -9 661.50 -56.7 -53.4 -54.6 66 -99 SPO 1997 10 31 14 05 41 3.1 -9 661.50 -56.9 -53.4 -54.8 67 -99 SPO 1997 10 31 14 06 40 3.1 -9 661.50 -56.9 -53.4 -54.8 66 -99 SPO 1997 10 31 14 07 40 3.1 -9 661.50 -56.9 -53.3 -55.0 66 -99 SPO 1997 10 31 14 08 39 3.2 -9 661.50 -56.9 -53.3 -55.1 65 -99 SPO 1997 10 31 14 09 38 3.1 -9 661.50 -56.9 -53.3 -55.2 64 -99 SPO 1997 10 31 14 10 39 3.1 -9 661.50 -56.7 -53.3 -55.2 63 -99 SPO 1997 10 31 14 11 39 3.1 -9 661.50 -56.7 -53.3 -55.3 63 -99 SPO 1997 10 31 14 12 39 3.1 -9 661.50 -57.0 -53.4 -55.3 64 -99 SPO 1997 10 31 14 13 39 3.1 -9 661.50 -57.0 -53.4 -55.3 63 -99 SPO 1997 10 31 14 14 40 3.0 -9 661.50 -57.0 -53.4 -55.2 63 -99 SPO 1997 10 31 14 15 41 2.9 -9 661.50 -57.0 -53.4 -55.1 62 -99 SPO 1997 10 31 14 16 42 2.7 -9 661.50 -57.0 -53.4 -55.0 60 -99 SPO 1997 10 31 14 17 42 2.7 -9 661.50 -57.0 -53.4 -55.0 60 -99 SPO 1997 10 31 14 18 42 2.8 -9 661.50 -57.2 -53.4 -55.1 62 -99 SPO 1997 10 31 14 19 41 2.8 -9 661.50 -57.2 -53.4 -55.1 61 -99 SPO 1997 10 31 14 20 42 2.8 -9 661.50 -57.2 -53.4 -55.1 61 -99 SPO 1997 10 31 14 21 41 2.7 -9 661.50 -57.2 -53.4 -55.2 61 -99 SPO 1997 10 31 14 22 41 2.7 -9 661.50 -57.2 -53.5 -55.2 61 -99 SPO 1997 10 31 14 23 42 2.7 -9 661.50 -57.2 -53.6 -55.2 61 -99 SPO 1997 10 31 14 24 42 2.6 -9 661.50 -57.2 -53.5 -55.2 61 -99 SPO 1997 10 31 14 25 42 2.7 -9 661.50 -57.2 -53.5 -55.3 61 -99 SPO 1997 10 31 14 26 42 2.7 -9 661.50 -57.2 -53.5 -55.3 61 -99 SPO 1997 10 31 14 27 42 2.7 -9 661.50 -57.2 -53.5 -55.4 61 -99 SPO 1997 10 31 14 28 41 2.7 -9 661.50 -57.2 -53.6 -55.4 61 -99 SPO 1997 10 31 14 29 42 2.7 -9 661.50 -57.2 -53.6 -55.4 61 -99 SPO 1997 10 31 14 30 42 2.7 -9 661.50 -57.2 -53.6 -55.4 61 -99 SPO 1997 10 31 14 31 42 2.7 -9 661.50 -57.2 -53.5 -55.4 60 -99 SPO 1997 10 31 14 32 41 2.5 -9 661.50 -57.2 -53.6 -55.3 60 -99 SPO 1997 10 31 14 33 42 2.5 -9 661.50 -57.2 -53.6 -55.3 59 -99 SPO 1997 10 31 14 34 41 2.6 -9 661.60 -57.2 -53.6 -55.2 59 -99 SPO 1997 10 31 14 35 41 2.6 -9 661.60 -57.2 -53.5 -55.2 59 -99 SPO 1997 10 31 14 36 39 2.7 -9 661.50 -57.2 -53.5 -55.2 60 -99 SPO 1997 10 31 14 37 37 2.8 -9 661.60 -57.2 -53.5 -55.4 60 -99 SPO 1997 10 31 14 38 37 2.8 -9 661.60 -57.2 -53.4 -55.4 60 -99 SPO 1997 10 31 14 39 36 2.7 -9 661.50 -57.2 -53.5 -55.4 61 -99 SPO 1997 10 31 14 40 37 2.8 -9 661.50 -57.2 -53.4 -55.3 62 -99 SPO 1997 10 31 14 41 38 2.8 -9 661.50 -57.2 -53.4 -55.3 62 -99 SPO 1997 10 31 14 42 37 2.7 -9 661.50 -57.2 -53.4 -55.2 62 -99 SPO 1997 10 31 14 43 38 2.8 -9 661.60 -57.2 -53.5 -55.2 62 -99 SPO 1997 10 31 14 44 38 2.7 -9 661.60 -57.2 -53.5 -55.2 61 -99 SPO 1997 10 31 14 45 38 2.8 -9 661.60 -57.2 -53.5 -55.2 61 -99 SPO 1997 10 31 14 46 37 2.9 -9 661.60 -57.2 -53.5 -55.2 61 -99 SPO 1997 10 31 14 47 37 2.9 -9 661.60 -57.2 -53.5 -55.3 61 -99 SPO 1997 10 31 14 48 36 3.0 -9 661.60 -57.2 -53.5 -55.4 61 -99 SPO 1997 10 31 14 49 36 3.1 -9 661.50 -57.2 -53.4 -55.6 61 -99 SPO 1997 10 31 14 50 35 3.1 -9 661.50 -57.2 -53.3 -55.6 61 -99 SPO 1997 10 31 14 51 34 3.2 -9 661.50 -57.2 -53.2 -55.7 60 -99 SPO 1997 10 31 14 52 33 3.5 -9 661.50 -57.2 -53.2 -55.8 60 -99 SPO 1997 10 31 14 53 34 3.5 -9 661.50 -57.2 -53.1 -55.8 61 -99 SPO 1997 10 31 14 54 34 3.6 -9 661.50 -57.0 -53.0 -55.8 60 -99 SPO 1997 10 31 14 55 34 3.6 -9 661.50 -57.0 -53.0 -55.8 60 -99 SPO 1997 10 31 14 56 35 3.5 -9 661.50 -56.7 -53.0 -55.6 59 -99 SPO 1997 10 31 14 57 37 3.5 -9 661.50 -56.7 -53.0 -55.5 60 -99 SPO 1997 10 31 14 58 37 3.5 -9 661.50 -56.7 -53.0 -55.5 60 -99 SPO 1997 10 31 14 59 37 3.5 -9 661.50 -56.5 -53.0 -55.4 60 -99 SPO 1997 10 31 15 00 36 3.6 -9 661.50 -56.5 -53.0 -55.4 60 0 SPO 1997 10 31 15 01 35 3.6 -9 661.50 -56.5 -53.0 -55.4 61 -99 SPO 1997 10 31 15 02 35 3.6 -9 661.50 -56.2 -53.0 -55.4 60 -99 SPO 1997 10 31 15 03 34 3.7 -9 661.50 -56.2 -52.9 -55.2 61 -99 SPO 1997 10 31 15 04 34 3.6 -9 661.50 -56.0 -53.0 -55.1 61 -99 SPO 1997 10 31 15 05 33 3.6 -9 661.50 -55.7 -52.9 -54.9 60 -99 SPO 1997 10 31 15 06 33 3.6 -9 661.50 -55.4 -52.9 -54.8 59 -99 SPO 1997 10 31 15 07 33 3.5 -9 661.50 -55.2 -52.9 -54.6 58 -99 SPO 1997 10 31 15 08 32 3.4 -9 661.50 -55.2 -53.0 -54.6 59 -99 SPO 1997 10 31 15 09 31 3.4 -9 661.50 -55.2 -53.1 -54.5 60 -99 SPO 1997 10 31 15 10 31 3.5 -9 661.50 -55.0 -53.1 -54.4 59 -99 SPO 1997 10 31 15 11 31 3.5 -9 661.50 -55.0 -53.1 -54.4 61 -99 SPO 1997 10 31 15 12 32 3.6 -9 661.50 -55.0 -53.1 -54.4 62 -99 SPO 1997 10 31 15 13 32 3.7 -9 661.50 -55.0 -53.1 -54.3 63 -99 SPO 1997 10 31 15 14 32 3.6 -9 661.50 -54.9 -53.1 -54.3 63 -99 SPO 1997 10 31 15 15 32 3.8 -9 661.50 -54.9 -53.1 -54.3 64 -99 SPO 1997 10 31 15 16 32 3.7 -9 661.50 -54.9 -53.1 -54.3 64 -99 SPO 1997 10 31 15 17 32 3.7 -9 661.50 -54.9 -53.1 -54.3 64 -99 SPO 1997 10 31 15 18 32 3.7 -9 661.50 -54.9 -53.2 -54.3 65 -99 SPO 1997 10 31 15 19 32 3.7 -9 661.50 -54.9 -53.1 -54.3 65 -99 SPO 1997 10 31 15 20 31 3.8 -9 661.50 -54.9 -53.1 -54.3 65 -99 SPO 1997 10 31 15 21 32 3.7 -9 661.50 -54.9 -53.1 -54.3 64 -99 SPO 1997 10 31 15 22 32 3.8 -9 661.50 -54.9 -53.1 -54.4 63 -99 SPO 1997 10 31 15 23 32 3.9 -9 661.50 -54.7 -53.0 -54.3 61 -99 SPO 1997 10 31 15 24 32 3.9 -9 661.50 -54.7 -53.0 -54.3 61 -99 SPO 1997 10 31 15 25 32 3.7 -9 661.50 -54.7 -53.1 -54.3 61 -99 SPO 1997 10 31 15 26 31 3.7 -9 661.50 -54.7 -53.0 -54.2 61 -99 SPO 1997 10 31 15 27 32 3.6 -9 661.60 -54.7 -53.0 -54.2 62 -99 SPO 1997 10 31 15 28 32 3.7 -9 661.60 -54.7 -53.1 -54.2 62 -99 SPO 1997 10 31 15 29 32 3.7 -9 661.50 -54.7 -53.1 -54.2 62 -99 SPO 1997 10 31 15 30 31 3.7 -9 661.50 -54.7 -53.1 -54.2 63 -99 SPO 1997 10 31 15 31 31 3.8 -9 661.60 -54.7 -53.1 -54.1 64 -99 SPO 1997 10 31 15 32 31 3.8 -9 661.60 -54.5 -53.1 -54.1 63 -99 SPO 1997 10 31 15 33 30 4.0 -9 661.50 -54.5 -53.1 -54.1 63 -99 SPO 1997 10 31 15 34 30 4.0 -9 661.50 -54.5 -53.1 -54.0 63 -99 SPO 1997 10 31 15 35 30 3.9 -9 661.60 -54.5 -53.2 -54.0 63 -99 SPO 1997 10 31 15 36 31 3.9 -9 661.60 -54.5 -53.2 -54.0 63 -99 SPO 1997 10 31 15 37 31 3.8 -9 661.60 -54.4 -53.2 -54.0 63 -99 SPO 1997 10 31 15 38 32 3.8 -9 661.60 -54.4 -53.2 -54.0 62 -99 SPO 1997 10 31 15 39 32 3.8 -9 661.60 -54.4 -53.2 -54.0 61 -99 SPO 1997 10 31 15 40 32 3.9 -9 661.60 -54.4 -53.2 -54.0 62 -99 SPO 1997 10 31 15 41 32 4.0 -9 661.60 -54.4 -53.2 -54.0 62 -99 SPO 1997 10 31 15 42 32 3.9 -9 661.60 -54.4 -53.1 -53.9 63 -99 SPO 1997 10 31 15 43 32 4.0 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 44 32 4.0 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 45 32 4.0 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 46 31 4.2 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 47 31 4.2 -9 661.60 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 48 31 4.2 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 49 31 4.1 -9 661.60 -54.4 -53.1 -54.0 63 -99 SPO 1997 10 31 15 50 30 4.1 -9 661.60 -54.5 -53.1 -54.0 63 -99 SPO 1997 10 31 15 51 31 4.1 -9 661.60 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 52 30 4.1 -9 661.60 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 53 30 4.2 -9 661.50 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 54 30 4.2 -9 661.50 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 55 30 4.2 -9 661.50 -54.4 -52.9 -54.0 63 -99 SPO 1997 10 31 15 56 30 4.2 -9 661.50 -54.4 -52.9 -54.0 63 -99 SPO 1997 10 31 15 57 30 4.2 -9 661.50 -54.4 -53.0 -54.0 63 -99 SPO 1997 10 31 15 58 30 4.0 -9 661.50 -54.4 -52.9 -54.0 63 -99 SPO 1997 10 31 15 59 30 4.0 -9 661.50 -54.4 -52.9 -54.0 63 -99 SPO 1997 10 31 16 00 30 3.9 -9 661.50 -54.4 -52.8 -54.0 63 0 SPO 1997 10 31 16 01 31 3.8 -9 661.50 -54.4 -52.8 -54.0 63 -99 SPO 1997 10 31 16 02 32 3.8 -9 661.50 -54.4 -52.8 -54.0 63 -99 SPO 1997 10 31 16 03 32 3.8 -9 661.50 -54.4 -52.9 -54.0 62 -99 SPO 1997 10 31 16 04 33 3.8 -9 661.50 -54.4 -53.0 -54.0 62 -99 SPO 1997 10 31 16 05 33 3.8 -9 661.50 -54.4 -53.0 -54.0 61 -99 SPO 1997 10 31 16 06 33 3.7 -9 661.50 -54.4 -53.1 -54.0 61 -99 SPO 1997 10 31 16 07 34 3.6 -9 661.60 -54.4 -53.2 -53.9 61 -99 SPO 1997 10 31 16 08 36 3.4 -9 661.60 -54.4 -53.2 -53.9 62 -99 SPO 1997 10 31 16 09 37 3.3 -9 661.60 -54.5 -53.3 -53.9 63 -99 SPO 1997 10 31 16 10 38 3.3 -9 661.60 -54.5 -53.3 -53.9 63 -99 SPO 1997 10 31 16 11 37 3.3 -9 661.60 -54.5 -53.4 -53.9 63 -99 SPO 1997 10 31 16 12 37 3.3 -9 661.60 -54.5 -53.4 -54.0 63 -99 SPO 1997 10 31 16 13 37 3.4 -9 661.60 -54.5 -53.3 -54.0 63 -99 SPO 1997 10 31 16 14 37 3.4 -9 661.60 -54.5 -53.3 -54.0 63 -99 SPO 1997 10 31 16 15 38 3.4 -9 661.60 -54.5 -53.3 -54.0 62 -99 SPO 1997 10 31 16 16 37 3.5 -9 661.60 -54.5 -53.3 -54.0 62 -99 SPO 1997 10 31 16 17 37 3.4 -9 661.60 -54.5 -53.3 -54.0 61 -99 SPO 1997 10 31 16 18 37 3.5 -9 661.60 -54.5 -53.3 -54.0 61 -99 SPO 1997 10 31 16 19 37 3.5 -9 661.60 -54.5 -53.3 -54.0 60 -99 SPO 1997 10 31 16 20 37 3.6 -9 661.60 -54.5 -53.3 -54.0 60 -99 SPO 1997 10 31 16 21 37 3.7 -9 661.60 -54.5 -53.3 -54.0 60 -99 SPO 1997 10 31 16 22 38 3.6 -9 661.60 -54.5 -53.3 -54.0 61 -99 SPO 1997 10 31 16 23 37 3.5 -9 661.60 -54.5 -53.3 -54.0 61 -99 SPO 1997 10 31 16 24 37 3.5 -9 661.60 -54.5 -53.3 -54.0 60 -99 SPO 1997 10 31 16 25 37 3.5 -9 661.60 -54.5 -53.3 -54.0 61 -99 SPO 1997 10 31 16 26 36 3.6 -9 661.60 -54.5 -53.4 -54.0 61 -99 SPO 1997 10 31 16 27 36 3.7 -9 661.60 -54.5 -53.3 -53.9 61 -99 SPO 1997 10 31 16 28 35 3.8 -9 661.60 -54.5 -53.3 -53.9 62 -99 SPO 1997 10 31 16 29 34 3.7 -9 661.60 -54.5 -53.3 -53.9 61 -99 SPO 1997 10 31 16 30 33 3.8 -9 661.60 -54.4 -53.3 -53.9 60 -99 SPO 1997 10 31 16 31 32 3.7 -9 661.60 -54.4 -53.3 -53.9 61 -99 SPO 1997 10 31 16 32 31 3.6 -9 661.60 -54.2 -53.3 -53.8 60 -99 SPO 1997 10 31 16 33 30 3.7 -9 661.60 -54.2 -53.2 -53.8 60 -99 SPO 1997 10 31 16 34 30 3.9 -9 661.60 -54.2 -53.2 -53.8 61 -99 SPO 1997 10 31 16 35 31 3.9 -9 661.60 -54.2 -53.2 -53.8 62 -99 SPO 1997 10 31 16 36 31 4.1 -9 661.60 -54.2 -53.1 -53.8 62 -99 SPO 1997 10 31 16 37 31 4.0 -9 661.70 -54.2 -53.1 -53.7 62 -99 SPO 1997 10 31 16 38 31 3.9 -9 661.70 -54.2 -53.1 -53.7 62 -99 SPO 1997 10 31 16 39 31 3.9 -9 661.70 -54.0 -53.1 -53.7 60 -99 SPO 1997 10 31 16 40 30 3.9 -9 661.70 -54.0 -53.0 -53.7 61 -99 SPO 1997 10 31 16 41 30 3.8 -9 661.70 -54.0 -53.0 -53.6 63 -99 SPO 1997 10 31 16 42 29 3.8 -9 661.70 -54.0 -52.9 -53.6 61 -99 SPO 1997 10 31 16 43 29 3.9 -9 661.70 -54.0 -52.9 -53.6 61 -99 SPO 1997 10 31 16 44 29 4.0 -9 661.70 -54.0 -52.9 -53.6 61 -99 SPO 1997 10 31 16 45 28 4.0 -9 661.70 -54.0 -52.9 -53.6 61 -99 SPO 1997 10 31 16 46 28 3.9 -9 661.70 -54.0 -52.9 -53.6 61 -99 SPO 1997 10 31 16 47 27 3.8 -9 661.80 -54.0 -52.9 -53.6 63 -99 SPO 1997 10 31 16 48 27 3.8 -9 661.80 -54.0 -52.9 -53.6 63 -99 SPO 1997 10 31 16 49 27 3.8 -9 661.80 -54.0 -52.9 -53.5 63 -99 SPO 1997 10 31 16 50 27 3.8 -9 661.80 -54.0 -53.0 -53.5 63 -99 SPO 1997 10 31 16 51 27 3.7 -9 661.80 -53.9 -53.0 -53.5 63 -99 SPO 1997 10 31 16 52 27 3.6 -9 661.80 -53.9 -52.9 -53.5 63 -99 SPO 1997 10 31 16 53 27 3.6 -9 661.80 -53.9 -52.9 -53.5 63 -99 SPO 1997 10 31 16 54 28 3.6 -9 661.80 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 16 55 28 3.5 -9 661.80 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 16 56 28 3.6 -9 661.80 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 16 57 29 3.5 -9 661.80 -53.9 -52.8 -53.4 63 -99 SPO 1997 10 31 16 58 29 3.6 -9 661.80 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 16 59 30 3.7 -9 661.80 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 17 00 30 3.7 -9 661.80 -53.9 -53.0 -53.4 63 0 SPO 1997 10 31 17 01 30 3.7 -9 661.80 -53.9 -53.0 -53.4 63 -99 SPO 1997 10 31 17 02 29 3.6 -9 661.80 -53.9 -53.1 -53.4 63 -99 SPO 1997 10 31 17 03 29 3.6 -9 661.80 -53.9 -53.1 -53.4 64 -99 SPO 1997 10 31 17 04 29 3.7 -9 661.80 -53.9 -53.1 -53.4 64 -99 SPO 1997 10 31 17 05 30 3.6 -9 661.80 -53.9 -53.0 -53.4 64 -99 SPO 1997 10 31 17 06 30 3.6 -9 661.80 -54.0 -53.0 -53.5 66 -99 SPO 1997 10 31 17 07 31 3.7 -9 661.80 -54.0 -53.0 -53.5 66 -99 SPO 1997 10 31 17 08 32 3.6 -9 661.80 -53.9 -53.0 -53.4 64 -99 SPO 1997 10 31 17 09 32 3.6 -9 661.80 -53.9 -53.0 -53.5 64 -99 SPO 1997 10 31 17 10 32 3.7 -9 661.80 -54.0 -53.0 -53.5 64 -99 SPO 1997 10 31 17 11 32 3.5 -9 661.80 -54.0 -53.0 -53.5 64 -99 SPO 1997 10 31 17 12 33 3.5 -9 661.80 -54.0 -53.0 -53.4 64 -99 SPO 1997 10 31 17 13 34 3.5 -9 661.80 -54.0 -52.9 -53.4 64 -99 SPO 1997 10 31 17 14 33 3.4 -9 661.80 -54.0 -52.9 -53.4 64 -99 SPO 1997 10 31 17 15 33 3.4 -9 661.90 -53.9 -52.9 -53.4 63 -99 SPO 1997 10 31 17 16 33 3.3 -9 661.90 -53.9 -52.9 -53.4 64 -99 SPO 1997 10 31 17 17 33 3.4 -9 661.90 -53.9 -52.9 -53.4 64 -99 SPO 1997 10 31 17 18 34 3.5 -9 661.80 -53.9 -52.9 -53.4 64 -99 SPO 1997 10 31 17 19 34 3.6 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 20 34 3.8 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 21 34 3.8 -9 661.80 -54.0 -52.9 -53.4 66 -99 SPO 1997 10 31 17 22 34 3.8 -9 661.80 -54.0 -52.9 -53.4 66 -99 SPO 1997 10 31 17 23 34 3.8 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 24 34 3.8 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 25 33 3.9 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 26 34 3.9 -9 661.80 -54.0 -52.9 -53.4 65 -99 SPO 1997 10 31 17 27 33 3.9 -9 661.80 -54.0 -52.9 -53.5 65 -99 SPO 1997 10 31 17 28 32 3.9 -9 661.80 -54.0 -52.9 -53.4 66 -99 SPO 1997 10 31 17 29 32 3.8 -9 661.80 -53.9 -52.9 -53.4 65 -99 SPO 1997 10 31 17 30 32 3.8 -9 661.80 -53.9 -52.9 -53.4 66 -99 SPO 1997 10 31 17 31 32 3.8 -9 661.80 -53.9 -52.8 -53.4 66 -99 SPO 1997 10 31 17 32 31 3.8 -9 661.80 -54.0 -52.8 -53.4 67 -99 SPO 1997 10 31 17 33 32 3.6 -9 661.90 -53.9 -52.8 -53.3 66 -99 SPO 1997 10 31 17 34 32 3.5 -9 661.90 -53.9 -52.9 -53.3 66 -99 SPO 1997 10 31 17 35 30 3.5 -9 661.90 -53.9 -52.8 -53.3 66 -99 SPO 1997 10 31 17 36 30 3.4 -9 661.90 -53.9 -52.8 -53.2 65 -99 SPO 1997 10 31 17 37 29 3.3 -9 661.90 -53.9 -52.8 -53.2 65 -99 SPO 1997 10 31 17 38 30 3.2 -9 661.90 -53.7 -52.9 -53.2 64 -99 SPO 1997 10 31 17 39 29 3.0 -9 661.90 -53.7 -53.0 -53.1 64 -99 SPO 1997 10 31 17 40 29 2.9 -9 661.90 -53.9 -53.0 -53.1 66 -99 SPO 1997 10 31 17 41 29 2.9 -9 661.90 -53.9 -53.0 -53.2 66 -99 SPO 1997 10 31 17 42 29 2.8 -9 661.90 -54.0 -53.0 -53.2 67 -99 SPO 1997 10 31 17 43 31 2.8 -9 661.90 -54.0 -53.0 -53.1 67 -99 SPO 1997 10 31 17 44 29 2.7 -9 661.90 -54.0 -53.1 -53.1 66 -99 SPO 1997 10 31 17 45 29 2.6 -9 661.90 -54.0 -53.1 -53.1 66 -99 SPO 1997 10 31 17 46 31 2.6 -9 661.90 -54.0 -53.2 -53.1 66 -99 SPO 1997 10 31 17 47 29 2.6 -9 661.90 -53.9 -53.2 -53.1 66 -99 SPO 1997 10 31 17 48 32 2.7 -9 661.90 -54.0 -53.2 -53.1 66 -99 SPO 1997 10 31 17 49 34 2.6 -9 661.90 -54.0 -53.2 -53.2 65 -99 SPO 1997 10 31 17 50 35 2.5 -9 661.90 -54.2 -53.2 -53.2 67 -99 SPO 1997 10 31 17 51 35 2.6 -9 662.00 -54.2 -53.1 -53.2 65 -99 SPO 1997 10 31 17 52 34 2.6 -9 662.00 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 31 17 53 35 2.7 -9 662.00 -54.2 -53.2 -53.3 64 -99 SPO 1997 10 31 17 54 35 2.8 -9 662.00 -54.2 -53.2 -53.4 64 -99 SPO 1997 10 31 17 55 34 3.0 -9 662.00 -54.2 -53.1 -53.4 63 -99 SPO 1997 10 31 17 56 33 3.2 -9 662.00 -54.4 -53.2 -53.5 64 -99 SPO 1997 10 31 17 57 33 3.2 -9 661.90 -54.4 -53.2 -53.6 66 -99 SPO 1997 10 31 17 58 33 3.3 -9 661.90 -54.4 -53.2 -53.6 66 -99 SPO 1997 10 31 17 59 34 3.4 -9 661.90 -54.4 -53.2 -53.6 64 -99 SPO 1997 10 31 18 00 33 3.4 -9 661.90 -54.4 -53.2 -53.6 64 0 SPO 1997 10 31 18 01 33 3.5 -9 661.90 -54.5 -53.1 -53.7 65 -99 SPO 1997 10 31 18 02 33 3.6 -9 661.90 -54.5 -53.1 -53.8 64 -99 SPO 1997 10 31 18 03 33 3.7 -9 661.90 -54.5 -53.1 -53.8 63 -99 SPO 1997 10 31 18 04 34 3.8 -9 661.90 -54.5 -53.0 -53.8 63 -99 SPO 1997 10 31 18 05 34 3.8 -9 661.90 -54.5 -53.0 -53.9 63 -99 SPO 1997 10 31 18 06 34 3.8 -9 661.90 -54.5 -53.0 -53.9 63 -99 SPO 1997 10 31 18 07 33 3.8 -9 661.90 -54.5 -53.0 -53.9 63 -99 SPO 1997 10 31 18 08 34 3.7 -9 661.90 -54.5 -53.0 -53.8 63 -99 SPO 1997 10 31 18 09 34 3.7 -9 661.90 -54.5 -53.0 -53.8 63 -99 SPO 1997 10 31 18 10 34 3.6 -9 661.90 -54.4 -52.9 -53.8 63 -99 SPO 1997 10 31 18 11 35 3.6 -9 661.90 -54.4 -52.9 -53.7 63 -99 SPO 1997 10 31 18 12 36 3.4 -9 661.90 -54.4 -52.9 -53.7 64 -99 SPO 1997 10 31 18 13 36 3.4 -9 661.90 -54.2 -53.0 -53.7 62 -99 SPO 1997 10 31 18 14 37 3.5 -9 661.90 -54.4 -53.0 -53.7 63 -99 SPO 1997 10 31 18 15 36 3.5 -9 661.90 -54.2 -53.1 -53.7 63 -99 SPO 1997 10 31 18 16 37 3.5 -9 661.90 -54.2 -53.1 -53.7 63 -99 SPO 1997 10 31 18 17 39 3.4 -9 661.90 -54.2 -53.1 -53.6 62 -99 SPO 1997 10 31 18 18 39 3.2 -9 661.90 -54.2 -53.1 -53.6 62 -99 SPO 1997 10 31 18 19 40 3.1 -9 662.00 -54.2 -53.1 -53.6 63 -99 SPO 1997 10 31 18 20 41 3.0 -9 662.00 -54.2 -53.2 -53.6 63 -99 SPO 1997 10 31 18 21 42 3.0 -9 662.00 -54.2 -53.2 -53.5 64 -99 SPO 1997 10 31 18 22 43 3.0 -9 662.00 -54.2 -53.3 -53.5 64 -99 SPO 1997 10 31 18 23 44 3.0 -9 662.00 -54.2 -53.3 -53.4 65 -99 SPO 1997 10 31 18 24 44 3.0 -9 662.00 -54.2 -53.3 -53.5 65 -99 SPO 1997 10 31 18 25 44 3.0 -9 662.00 -54.2 -53.3 -53.5 65 -99 SPO 1997 10 31 18 26 45 3.0 -9 662.00 -54.2 -53.3 -53.5 64 -99 SPO 1997 10 31 18 27 45 3.0 -9 662.00 -54.4 -53.3 -53.5 66 -99 SPO 1997 10 31 18 28 46 2.9 -9 662.00 -54.4 -53.3 -53.5 66 -99 SPO 1997 10 31 18 29 46 3.0 -9 662.00 -54.5 -53.3 -53.4 66 -99 SPO 1997 10 31 18 30 47 3.0 -9 662.00 -54.5 -53.3 -53.4 65 -99 SPO 1997 10 31 18 31 46 2.8 -9 662.00 -55.0 -53.3 -53.4 67 -99 SPO 1997 10 31 18 32 46 2.6 -9 662.00 -55.5 -53.3 -53.4 68 -99 SPO 1997 10 31 18 33 47 2.5 -9 662.00 -55.7 -53.3 -53.4 68 -99 SPO 1997 10 31 18 34 48 2.4 -9 662.00 -55.9 -53.4 -53.6 68 -99 SPO 1997 10 31 18 35 46 2.5 -9 662.00 -55.9 -53.5 -53.7 66 -99 SPO 1997 10 31 18 36 46 2.6 -9 662.00 -56.0 -53.4 -53.8 66 -99 SPO 1997 10 31 18 37 44 2.6 -9 661.90 -56.0 -53.4 -54.0 65 -99 SPO 1997 10 31 18 38 44 2.8 -9 661.90 -56.2 -53.4 -54.1 66 -99 SPO 1997 10 31 18 39 43 2.8 -9 661.90 -56.2 -53.4 -54.2 65 -99 SPO 1997 10 31 18 40 43 2.8 -9 661.90 -56.2 -53.4 -54.4 65 -99 SPO 1997 10 31 18 41 42 2.8 -9 661.90 -56.2 -53.3 -54.4 64 -99 SPO 1997 10 31 18 42 44 2.9 -9 662.00 -56.2 -53.1 -54.3 64 -99 SPO 1997 10 31 18 43 43 2.7 -9 661.90 -56.4 -53.3 -54.4 65 -99 SPO 1997 10 31 18 44 43 2.9 -9 662.00 -56.4 -53.3 -54.5 64 -99 SPO 1997 10 31 18 45 42 2.9 -9 662.00 -56.4 -53.3 -54.6 64 -99 SPO 1997 10 31 18 46 42 2.9 -9 662.00 -56.4 -53.2 -54.6 63 -99 SPO 1997 10 31 18 47 43 2.9 -9 662.00 -56.4 -53.3 -54.6 63 -99 SPO 1997 10 31 18 48 43 2.9 -9 662.00 -56.4 -53.3 -54.6 63 -99 SPO 1997 10 31 18 49 45 2.9 -9 662.00 -56.4 -53.2 -54.5 63 -99 SPO 1997 10 31 18 50 47 2.9 -9 662.00 -56.4 -53.3 -54.6 63 -99 SPO 1997 10 31 18 51 47 3.0 -9 662.00 -56.4 -53.3 -54.6 63 -99 SPO 1997 10 31 18 52 47 3.0 -9 662.00 -56.5 -53.3 -54.7 64 -99 SPO 1997 10 31 18 53 46 3.1 -9 662.00 -56.5 -53.4 -54.7 63 -99 SPO 1997 10 31 18 54 49 3.1 -9 662.00 -56.4 -53.3 -54.7 63 -99 SPO 1997 10 31 18 55 48 3.2 -9 662.00 -56.4 -53.4 -54.8 64 -99 SPO 1997 10 31 18 56 46 3.1 -9 662.00 -56.2 -53.5 -54.8 62 -99 SPO 1997 10 31 18 57 47 3.4 -9 662.00 -56.0 -53.2 -54.8 61 -99 SPO 1997 10 31 18 58 51 3.0 -9 662.10 -56.0 -53.4 -54.8 61 -99 SPO 1997 10 31 18 59 54 3.1 -9 662.10 -56.0 -53.4 -54.8 61 -99 SPO 1997 10 31 19 00 54 3.1 -9 662.10 -56.0 -53.4 -54.8 61 0 SPO 1997 10 31 19 01 53 3.1 -9 662.10 -56.0 -53.5 -54.9 61 -99 SPO 1997 10 31 19 02 51 3.1 -9 662.10 -56.0 -53.5 -54.9 61 -99 SPO 1997 10 31 19 03 49 3.1 -9 662.10 -56.0 -53.4 -54.9 61 -99 SPO 1997 10 31 19 04 47 3.2 -9 662.10 -56.0 -53.4 -55.0 61 -99 SPO 1997 10 31 19 05 46 3.1 -9 662.00 -56.0 -53.4 -55.0 62 -99 SPO 1997 10 31 19 06 45 3.1 -9 662.10 -56.0 -53.2 -55.0 62 -99 SPO 1997 10 31 19 07 44 3.1 -9 662.10 -56.0 -53.3 -55.0 63 -99 SPO 1997 10 31 19 08 44 3.1 -9 662.10 -56.0 -53.2 -55.0 63 -99 SPO 1997 10 31 19 09 42 3.1 -9 662.10 -56.0 -53.2 -54.9 64 -99 SPO 1997 10 31 19 10 41 3.0 -9 662.10 -55.9 -53.2 -54.9 63 -99 SPO 1997 10 31 19 11 40 3.0 -9 662.10 -55.9 -53.2 -54.8 63 -99 SPO 1997 10 31 19 12 40 3.1 -9 662.10 -55.7 -53.2 -54.8 61 -99 SPO 1997 10 31 19 13 37 3.1 -9 662.10 -55.7 -53.2 -54.8 61 -99 SPO 1997 10 31 19 14 40 3.1 -9 662.10 -55.7 -53.2 -54.8 61 -99 SPO 1997 10 31 19 15 40 3.0 -9 662.10 -55.7 -53.4 -54.8 61 -99 SPO 1997 10 31 19 16 44 2.9 -9 662.10 -55.7 -53.3 -54.7 61 -99 SPO 1997 10 31 19 17 44 3.0 -9 662.10 -55.9 -53.1 -54.7 64 -99 SPO 1997 10 31 19 18 42 3.1 -9 662.10 -55.9 -53.2 -54.7 64 -99 SPO 1997 10 31 19 19 40 3.1 -9 662.10 -55.9 -53.3 -54.7 65 -99 SPO 1997 10 31 19 20 38 3.2 -9 662.10 -55.9 -53.2 -54.8 65 -99 SPO 1997 10 31 19 21 36 3.3 -9 662.10 -55.9 -53.2 -54.8 65 -99 SPO 1997 10 31 19 22 35 3.2 -9 662.10 -55.7 -53.1 -54.8 63 -99 SPO 1997 10 31 19 23 34 3.3 -9 662.10 -55.7 -53.1 -54.8 63 -99 SPO 1997 10 31 19 24 32 3.4 -9 662.10 -55.7 -53.0 -54.8 64 -99 SPO 1997 10 31 19 25 30 3.6 -9 662.10 -55.5 -53.1 -54.8 62 -99 SPO 1997 10 31 19 26 29 3.5 -9 662.10 -55.5 -53.2 -54.7 62 -99 SPO 1997 10 31 19 27 29 3.4 -9 662.10 -55.4 -53.3 -54.6 62 -99 SPO 1997 10 31 19 28 31 3.4 -9 662.10 -55.0 -53.2 -54.4 59 -99 SPO 1997 10 31 19 29 31 3.4 -9 662.10 -54.7 -53.1 -54.1 59 -99 SPO 1997 10 31 19 30 30 3.4 -9 662.10 -54.9 -53.1 -54.1 62 -99 SPO 1997 10 31 19 31 30 3.4 -9 662.10 -55.0 -53.0 -54.2 63 -99 SPO 1997 10 31 19 32 29 3.5 -9 662.10 -55.0 -53.0 -54.2 64 -99 SPO 1997 10 31 19 33 30 3.5 -9 662.10 -54.9 -53.0 -54.2 63 -99 SPO 1997 10 31 19 34 31 3.4 -9 662.10 -54.9 -53.0 -54.1 63 -99 SPO 1997 10 31 19 35 31 3.2 -9 662.10 -55.0 -53.0 -54.1 65 -99 SPO 1997 10 31 19 36 30 3.3 -9 662.10 -54.9 -52.9 -54.1 64 -99 SPO 1997 10 31 19 37 30 3.4 -9 662.10 -54.9 -52.9 -54.1 65 -99 SPO 1997 10 31 19 38 29 3.5 -9 662.10 -54.9 -52.9 -54.0 65 -99 SPO 1997 10 31 19 39 28 3.4 -9 662.10 -54.7 -52.9 -54.0 63 -99 SPO 1997 10 31 19 40 28 3.3 -9 662.10 -54.7 -53.0 -53.9 64 -99 SPO 1997 10 31 19 41 28 3.4 -9 662.10 -54.5 -52.9 -53.8 63 -99 SPO 1997 10 31 19 42 28 3.4 -9 662.10 -54.5 -53.0 -53.7 63 -99 SPO 1997 10 31 19 43 29 3.4 -9 662.10 -54.4 -53.0 -53.6 62 -99 SPO 1997 10 31 19 44 30 3.4 -9 662.10 -54.2 -53.0 -53.6 61 -99 SPO 1997 10 31 19 45 30 3.4 -9 662.10 -54.2 -53.0 -53.6 63 -99 SPO 1997 10 31 19 46 30 3.5 -9 662.10 -54.2 -53.0 -53.6 64 -99 SPO 1997 10 31 19 47 30 3.5 -9 662.10 -54.4 -53.1 -53.6 66 -99 SPO 1997 10 31 19 48 32 3.5 -9 662.10 -54.4 -53.0 -53.6 67 -99 SPO 1997 10 31 19 49 32 3.4 -9 662.10 -54.4 -53.0 -53.6 67 -99 SPO 1997 10 31 19 50 33 3.4 -9 662.10 -54.2 -53.0 -53.6 66 -99 SPO 1997 10 31 19 51 34 3.4 -9 662.10 -54.2 -53.0 -53.6 66 -99 SPO 1997 10 31 19 52 34 3.3 -9 662.10 -54.2 -53.0 -53.6 66 -99 SPO 1997 10 31 19 53 35 3.3 -9 662.10 -54.2 -53.0 -53.6 65 -99 SPO 1997 10 31 19 54 36 3.3 -9 662.10 -54.4 -53.0 -53.6 67 -99 SPO 1997 10 31 19 55 36 3.4 -9 662.10 -54.4 -53.1 -53.6 67 -99 SPO 1997 10 31 19 56 36 3.4 -9 662.10 -54.4 -53.2 -53.6 67 -99 SPO 1997 10 31 19 57 37 3.3 -9 662.10 -54.2 -53.2 -53.5 65 -99 SPO 1997 10 31 19 58 38 3.3 -9 662.10 -54.4 -53.2 -53.5 67 -99 SPO 1997 10 31 19 59 38 3.3 -9 662.10 -54.4 -53.2 -53.6 67 -99 SPO 1997 10 31 20 00 36 3.3 -9 662.10 -54.4 -53.2 -53.6 68 0 SPO 1997 10 31 20 01 37 3.4 -9 662.10 -54.4 -53.1 -53.6 68 -99 SPO 1997 10 31 20 02 36 3.5 -9 662.10 -54.4 -53.0 -53.6 68 -99 SPO 1997 10 31 20 03 36 3.6 -9 662.10 -54.4 -53.0 -53.7 68 -99 SPO 1997 10 31 20 04 35 3.7 -9 662.10 -54.4 -53.0 -53.7 68 -99 SPO 1997 10 31 20 05 35 3.7 -9 662.10 -54.4 -53.0 -53.7 68 -99 SPO 1997 10 31 20 06 35 3.8 -9 662.10 -54.4 -53.0 -53.7 68 -99 SPO 1997 10 31 20 07 34 4.0 -9 662.10 -54.4 -53.0 -53.7 68 -99 SPO 1997 10 31 20 08 33 4.0 -9 662.00 -54.4 -53.0 -53.7 67 -99 SPO 1997 10 31 20 09 33 4.0 -9 662.00 -54.4 -53.0 -53.6 67 -99 SPO 1997 10 31 20 10 32 4.1 -9 662.00 -54.2 -52.9 -53.7 66 -99 SPO 1997 10 31 20 11 32 4.2 -9 662.00 -54.2 -52.9 -53.6 66 -99 SPO 1997 10 31 20 12 31 4.1 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 13 30 4.2 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 14 30 4.3 -9 662.00 -54.2 -52.9 -53.7 67 -99 SPO 1997 10 31 20 15 29 4.4 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 16 29 4.4 -9 662.00 -54.2 -52.8 -53.6 67 -99 SPO 1997 10 31 20 17 29 4.3 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 18 27 4.6 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 19 27 4.7 -9 662.00 -54.2 -52.8 -53.7 67 -99 SPO 1997 10 31 20 20 28 4.7 -9 662.00 -54.2 -52.8 -53.6 67 -99 SPO 1997 10 31 20 21 28 4.8 -9 662.00 -54.0 -52.8 -53.6 66 -99 SPO 1997 10 31 20 22 27 4.6 -9 661.90 -54.2 -52.9 -53.7 67 -99 SPO 1997 10 31 20 23 28 4.9 -9 662.00 -54.2 -52.8 -53.8 67 -99 SPO 1997 10 31 20 24 27 5.0 -9 662.00 -54.2 -52.8 -53.8 67 -99 SPO 1997 10 31 20 25 26 5.0 -9 662.00 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 31 20 26 25 4.8 -9 662.00 -54.2 -52.7 -53.8 67 -99 SPO 1997 10 31 20 27 25 4.9 -9 662.00 -54.2 -52.7 -53.7 67 -99 SPO 1997 10 31 20 28 25 4.7 -9 662.00 -54.0 -52.7 -53.7 67 -99 SPO 1997 10 31 20 29 24 4.8 -9 662.00 -54.0 -52.6 -53.7 67 -99 SPO 1997 10 31 20 30 23 4.9 -9 662.00 -54.0 -52.6 -53.6 67 -99 SPO 1997 10 31 20 31 23 4.9 -9 662.00 -54.0 -52.5 -53.6 67 -99 SPO 1997 10 31 20 32 22 4.7 -9 662.00 -54.0 -52.5 -53.6 67 -99 SPO 1997 10 31 20 33 21 4.7 -9 662.00 -53.9 -52.6 -53.5 67 -99 SPO 1997 10 31 20 34 20 4.7 -9 662.00 -53.9 -52.6 -53.6 67 -99 SPO 1997 10 31 20 35 20 4.7 -9 662.00 -54.0 -52.5 -53.5 67 -99 SPO 1997 10 31 20 36 19 4.8 -9 662.00 -53.9 -52.4 -53.5 67 -99 SPO 1997 10 31 20 37 19 4.8 -9 662.10 -53.9 -52.4 -53.5 67 -99 SPO 1997 10 31 20 38 18 4.9 -9 662.10 -53.7 -52.4 -53.5 65 -99 SPO 1997 10 31 20 39 19 5.0 -9 662.10 -53.7 -52.3 -53.4 66 -99 SPO 1997 10 31 20 40 18 4.8 -9 662.10 -53.7 -52.3 -53.4 66 -99 SPO 1997 10 31 20 41 18 5.0 -9 662.10 -53.7 -52.3 -53.4 67 -99 SPO 1997 10 31 20 42 19 5.0 -9 662.10 -53.7 -52.2 -53.4 67 -99 SPO 1997 10 31 20 43 19 4.8 -9 662.10 -53.7 -52.2 -53.4 67 -99 SPO 1997 10 31 20 44 20 5.0 -9 662.10 -53.7 -52.0 -53.4 68 -99 SPO 1997 10 31 20 45 21 4.9 -9 662.10 -53.7 -52.0 -53.4 68 -99 SPO 1997 10 31 20 46 20 4.9 -9 662.10 -53.7 -52.0 -53.4 67 -99 SPO 1997 10 31 20 47 22 5.0 -9 662.10 -53.7 -52.0 -53.4 67 -99 SPO 1997 10 31 20 48 21 5.0 -9 662.10 -53.7 -52.2 -53.4 67 -99 SPO 1997 10 31 20 49 21 5.0 -9 662.10 -53.7 -52.2 -53.4 67 -99 SPO 1997 10 31 20 50 21 5.0 -9 662.10 -53.7 -52.2 -53.4 67 -99 SPO 1997 10 31 20 51 21 5.0 -9 662.10 -53.7 -52.2 -53.4 69 -99 SPO 1997 10 31 20 52 20 4.8 -9 662.10 -53.7 -52.4 -53.4 69 -99 SPO 1997 10 31 20 53 21 4.9 -9 662.10 -53.7 -52.5 -53.4 69 -99 SPO 1997 10 31 20 54 19 4.9 -9 662.10 -53.7 -52.6 -53.4 69 -99 SPO 1997 10 31 20 55 19 4.8 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 20 56 21 4.8 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 20 57 21 4.7 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 20 58 22 4.7 -9 662.10 -53.7 -52.4 -53.4 68 -99 SPO 1997 10 31 20 59 22 4.7 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 00 22 4.6 -9 662.10 -53.7 -52.4 -53.4 67 0 SPO 1997 10 31 21 01 22 4.6 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 02 21 4.7 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 03 21 4.6 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 04 21 4.9 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 05 22 4.8 -9 662.10 -53.7 -52.3 -53.4 67 -99 SPO 1997 10 31 21 06 22 4.7 -9 662.10 -53.7 -52.4 -53.4 67 -99 SPO 1997 10 31 21 07 21 4.7 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 21 08 21 4.6 -9 662.10 -53.7 -52.4 -53.4 68 -99 SPO 1997 10 31 21 09 21 4.7 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 21 10 19 4.6 -9 662.10 -53.7 -52.5 -53.3 68 -99 SPO 1997 10 31 21 11 19 4.8 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 12 18 5.0 -9 662.10 -53.7 -52.4 -53.4 67 -99 SPO 1997 10 31 21 13 16 4.8 -9 662.10 -53.7 -52.5 -53.4 67 -99 SPO 1997 10 31 21 14 17 4.9 -9 662.10 -53.7 -52.4 -53.3 67 -99 SPO 1997 10 31 21 15 17 5.0 -9 662.10 -53.7 -52.4 -53.4 67 -99 SPO 1997 10 31 21 16 17 5.0 -9 662.10 -53.7 -52.4 -53.4 67 -99 SPO 1997 10 31 21 17 18 5.0 -9 662.10 -53.7 -52.4 -53.4 68 -99 SPO 1997 10 31 21 18 18 5.0 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 21 19 18 5.2 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 21 20 18 5.2 -9 662.10 -53.7 -52.5 -53.4 68 -99 SPO 1997 10 31 21 21 17 5.0 -9 662.10 -53.7 -52.6 -53.4 68 -99 SPO 1997 10 31 21 22 16 5.0 -9 662.10 -53.7 -52.6 -53.4 67 -99 SPO 1997 10 31 21 23 17 5.0 -9 662.10 -53.7 -52.7 -53.4 67 -99 SPO 1997 10 31 21 24 17 5.0 -9 662.10 -53.7 -52.7 -53.4 67 -99 SPO 1997 10 31 21 25 17 5.2 -9 662.10 -53.7 -52.7 -53.4 66 -99 SPO 1997 10 31 21 26 17 5.3 -9 662.10 -53.7 -52.7 -53.5 66 -99 SPO 1997 10 31 21 27 16 5.2 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 28 16 5.2 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 29 17 5.2 -9 662.10 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 30 16 5.2 -9 662.10 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 31 15 5.1 -9 662.20 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 32 14 5.2 -9 662.20 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 33 15 5.2 -9 662.20 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 34 16 5.3 -9 662.20 -53.7 -52.6 -53.5 67 -99 SPO 1997 10 31 21 35 17 5.2 -9 662.20 -53.7 -52.6 -53.5 67 -99 SPO 1997 10 31 21 36 17 5.2 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 37 18 5.2 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 38 18 5.3 -9 662.20 -53.7 -52.6 -53.5 65 -99 SPO 1997 10 31 21 39 18 5.2 -9 662.20 -53.7 -52.6 -53.5 65 -99 SPO 1997 10 31 21 40 18 5.2 -9 662.20 -53.7 -52.6 -53.5 65 -99 SPO 1997 10 31 21 41 18 5.3 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 42 16 5.4 -9 662.10 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 43 16 5.2 -9 662.10 -53.7 -52.6 -53.5 67 -99 SPO 1997 10 31 21 44 16 5.4 -9 662.10 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 45 16 5.4 -9 662.10 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 46 17 5.3 -9 662.10 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 21 47 17 5.5 -9 662.20 -53.7 -52.6 -53.5 67 -99 SPO 1997 10 31 21 48 18 5.4 -9 662.20 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 49 19 5.3 -9 662.20 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 50 18 5.3 -9 662.20 -53.7 -52.6 -53.5 66 -99 SPO 1997 10 31 21 51 18 5.2 -9 662.20 -53.7 -52.6 -53.6 65 -99 SPO 1997 10 31 21 52 17 5.4 -9 662.20 -53.7 -52.5 -53.6 66 -99 SPO 1997 10 31 21 53 17 5.5 -9 662.20 -53.7 -52.6 -53.6 66 -99 SPO 1997 10 31 21 54 15 5.5 -9 662.20 -53.7 -52.6 -53.5 67 -99 SPO 1997 10 31 21 55 16 5.5 -9 662.20 -53.5 -52.6 -53.5 65 -99 SPO 1997 10 31 21 56 16 5.5 -9 662.10 -53.5 -52.6 -53.5 65 -99 SPO 1997 10 31 21 57 15 5.6 -9 662.20 -53.5 -52.6 -53.5 65 -99 SPO 1997 10 31 21 58 15 5.6 -9 662.20 -53.5 -52.7 -53.5 65 -99 SPO 1997 10 31 21 59 15 5.5 -9 662.20 -53.7 -52.7 -53.5 67 -99 SPO 1997 10 31 22 00 15 5.5 -9 662.20 -53.7 -52.7 -53.6 66 0 SPO 1997 10 31 22 01 14 5.5 -9 662.20 -53.7 -52.8 -53.5 66 -99 SPO 1997 10 31 22 02 14 5.5 -9 662.20 -53.7 -52.8 -53.5 66 -99 SPO 1997 10 31 22 03 14 5.4 -9 662.10 -53.7 -52.8 -53.5 66 -99 SPO 1997 10 31 22 04 14 5.2 -9 662.10 -53.5 -52.8 -53.5 64 -99 SPO 1997 10 31 22 05 13 5.3 -9 662.10 -53.5 -52.8 -53.5 64 -99 SPO 1997 10 31 22 06 13 5.2 -9 662.10 -53.5 -52.8 -53.4 64 -99 SPO 1997 10 31 22 07 14 5.2 -9 662.10 -53.5 -52.8 -53.4 65 -99 SPO 1997 10 31 22 08 14 5.1 -9 662.10 -53.5 -52.8 -53.4 65 -99 SPO 1997 10 31 22 09 16 5.2 -9 662.10 -53.5 -52.8 -53.4 66 -99 SPO 1997 10 31 22 10 16 5.0 -9 662.20 -53.5 -52.8 -53.4 66 -99 SPO 1997 10 31 22 11 16 4.7 -9 662.20 -53.5 -52.8 -53.4 66 -99 SPO 1997 10 31 22 12 16 4.8 -9 662.20 -53.5 -52.8 -53.4 66 -99 SPO 1997 10 31 22 13 16 4.6 -9 662.20 -53.5 -52.8 -53.3 65 -99 SPO 1997 10 31 22 14 16 4.5 -9 662.20 -53.5 -52.9 -53.3 65 -99 SPO 1997 10 31 22 15 16 4.5 -9 662.20 -53.5 -53.0 -53.3 65 -99 SPO 1997 10 31 22 16 17 4.5 -9 662.20 -53.4 -53.0 -53.2 64 -99 SPO 1997 10 31 22 17 16 4.5 -9 662.20 -53.4 -53.0 -53.2 65 -99 SPO 1997 10 31 22 18 15 4.4 -9 662.20 -53.4 -52.9 -53.3 65 -99 SPO 1997 10 31 22 19 15 4.4 -9 662.20 -53.4 -53.0 -53.3 66 -99 SPO 1997 10 31 22 20 16 4.5 -9 662.20 -53.4 -53.0 -53.2 67 -99 SPO 1997 10 31 22 21 17 4.7 -9 662.20 -53.4 -53.0 -53.2 67 -99 SPO 1997 10 31 22 22 17 4.9 -9 662.20 -53.4 -53.0 -53.2 67 -99 SPO 1997 10 31 22 23 17 4.8 -9 662.20 -53.4 -53.0 -53.2 67 -99 SPO 1997 10 31 22 24 15 5.0 -9 662.30 -53.4 -52.9 -53.2 67 -99 SPO 1997 10 31 22 25 14 4.9 -9 662.30 -53.2 -52.9 -53.2 65 -99 SPO 1997 10 31 22 26 15 4.8 -9 662.30 -53.2 -52.9 -53.1 64 -99 SPO 1997 10 31 22 27 15 4.9 -9 662.30 -53.2 -52.9 -53.1 64 -99 SPO 1997 10 31 22 28 15 4.8 -9 662.30 -53.2 -52.9 -53.2 64 -99 SPO 1997 10 31 22 29 15 4.7 -9 662.30 -53.2 -53.0 -53.1 64 -99 SPO 1997 10 31 22 30 15 4.8 -9 662.30 -53.2 -53.0 -53.1 64 -99 SPO 1997 10 31 22 31 15 4.9 -9 662.30 -53.2 -53.0 -53.1 64 -99 SPO 1997 10 31 22 32 16 5.0 -9 662.30 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 33 15 4.9 -9 662.30 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 34 14 5.0 -9 662.40 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 35 13 5.0 -9 662.40 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 36 13 5.1 -9 662.40 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 37 13 5.1 -9 662.40 -53.2 -53.0 -53.1 65 -99 SPO 1997 10 31 22 38 13 5.1 -9 662.40 -53.2 -53.0 -53.1 64 -99 SPO 1997 10 31 22 39 13 5.2 -9 662.40 -53.2 -52.9 -53.1 64 -99 SPO 1997 10 31 22 40 13 5.3 -9 662.40 -53.2 -52.9 -53.1 64 -99 SPO 1997 10 31 22 41 12 5.4 -9 662.40 -53.0 -52.9 -53.1 63 -99 SPO 1997 10 31 22 42 13 5.4 -9 662.40 -53.0 -52.9 -53.0 64 -99 SPO 1997 10 31 22 43 12 5.2 -9 662.40 -53.0 -52.9 -53.0 64 -99 SPO 1997 10 31 22 44 12 5.2 -9 662.40 -53.0 -52.9 -53.0 64 -99 SPO 1997 10 31 22 45 12 5.1 -9 662.40 -53.0 -52.9 -53.0 64 -99 SPO 1997 10 31 22 46 12 5.2 -9 662.40 -53.0 -53.0 -53.0 65 -99 SPO 1997 10 31 22 47 11 5.1 -9 662.40 -53.0 -53.0 -53.0 65 -99 SPO 1997 10 31 22 48 10 5.0 -9 662.40 -53.0 -53.0 -52.9 66 -99 SPO 1997 10 31 22 49 10 4.8 -9 662.50 -53.0 -52.9 -52.9 66 -99 SPO 1997 10 31 22 50 10 5.0 -9 662.40 -52.9 -52.9 -52.9 65 -99 SPO 1997 10 31 22 51 9 4.7 -9 662.40 -52.9 -52.9 -52.9 65 -99 SPO 1997 10 31 22 52 9 5.0 -9 662.40 -52.9 -52.9 -52.8 65 -99 SPO 1997 10 31 22 53 9 5.0 -9 662.40 -52.9 -52.9 -52.8 65 -99 SPO 1997 10 31 22 54 9 5.0 -9 662.40 -52.7 -52.9 -52.8 64 -99 SPO 1997 10 31 22 55 9 5.0 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 22 56 7 4.9 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 22 57 9 5.0 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 22 58 9 5.1 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 22 59 9 5.1 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 23 00 8 5.0 -9 662.40 -52.9 -52.9 -52.8 67 0 SPO 1997 10 31 23 01 7 4.9 -9 662.40 -52.7 -52.9 -52.8 65 -99 SPO 1997 10 31 23 02 6 4.9 -9 662.50 -52.7 -52.9 -52.7 65 -99 SPO 1997 10 31 23 03 7 4.7 -9 662.50 -52.9 -52.9 -52.8 66 -99 SPO 1997 10 31 23 04 8 4.9 -9 662.50 -52.9 -52.9 -52.8 66 -99 SPO 1997 10 31 23 05 7 4.8 -9 662.50 -52.9 -52.9 -52.8 65 -99 SPO 1997 10 31 23 06 7 5.0 -9 662.50 -52.9 -52.8 -52.8 65 -99 SPO 1997 10 31 23 07 7 5.1 -9 662.50 -52.7 -52.8 -52.8 65 -99 SPO 1997 10 31 23 08 8 4.9 -9 662.50 -52.7 -52.8 -52.7 65 -99 SPO 1997 10 31 23 09 8 4.8 -9 662.50 -52.7 -52.8 -52.7 65 -99 SPO 1997 10 31 23 10 7 4.7 -9 662.50 -52.9 -52.8 -52.8 66 -99 SPO 1997 10 31 23 11 7 4.5 -9 662.50 -52.9 -52.8 -52.8 66 -99 SPO 1997 10 31 23 12 7 4.8 -9 662.50 -52.9 -52.8 -52.7 66 -99 SPO 1997 10 31 23 13 8 4.8 -9 662.50 -52.9 -52.8 -52.8 66 -99 SPO 1997 10 31 23 14 9 4.8 -9 662.50 -52.9 -52.8 -52.8 66 -99 SPO 1997 10 31 23 15 8 4.8 -9 662.50 -52.9 -52.8 -52.8 65 -99 SPO 1997 10 31 23 16 9 4.7 -9 662.50 -52.9 -52.8 -52.8 65 -99 SPO 1997 10 31 23 17 10 4.8 -9 662.50 -52.9 -52.7 -52.8 65 -99 SPO 1997 10 31 23 18 10 4.6 -9 662.50 -52.9 -52.8 -52.8 65 -99 SPO 1997 10 31 23 19 10 4.4 -9 662.50 -52.9 -52.8 -52.8 65 -99 SPO 1997 10 31 23 20 10 4.4 -9 662.50 -52.7 -52.8 -52.8 65 -99 SPO 1997 10 31 23 21 9 4.0 -9 662.50 -52.9 -52.9 -52.8 66 -99 SPO 1997 10 31 23 22 8 4.2 -9 662.60 -52.9 -52.9 -52.8 66 -99 SPO 1997 10 31 23 23 7 4.1 -9 662.60 -52.9 -52.9 -52.8 66 -99 SPO 1997 10 31 23 24 9 4.1 -9 662.60 -52.9 -52.9 -52.8 67 -99 SPO 1997 10 31 23 25 8 4.0 -9 662.60 -53.0 -52.9 -52.8 67 -99 SPO 1997 10 31 23 26 7 4.1 -9 662.60 -53.0 -52.9 -52.8 67 -99 SPO 1997 10 31 23 27 8 3.9 -9 662.60 -53.0 -52.9 -52.8 67 -99 SPO 1997 10 31 23 28 7 4.0 -9 662.70 -53.0 -52.9 -52.8 67 -99 SPO 1997 10 31 23 29 6 3.9 -9 662.70 -53.0 -52.9 -52.8 66 -99 SPO 1997 10 31 23 30 7 4.0 -9 662.70 -53.0 -52.9 -52.8 65 -99 SPO 1997 10 31 23 31 8 3.9 -9 662.70 -53.0 -52.9 -52.8 65 -99 SPO 1997 10 31 23 32 9 4.0 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 33 9 3.9 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 34 9 3.9 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 35 10 3.9 -9 662.70 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 36 9 4.0 -9 662.70 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 37 8 4.1 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 38 8 4.1 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 39 8 4.0 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 40 8 4.1 -9 662.70 -53.0 -52.9 -52.9 65 -99 SPO 1997 10 31 23 41 8 4.2 -9 662.70 -53.0 -52.9 -52.9 -99 -99 SPO 1997 10 31 23 42 9 4.2 -9 662.70 -53.0 -52.9 -52.9 -99 -99 SPO 1997 10 31 23 43 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 31 23 44 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 31 23 45 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 10 31 23 46 13 4.2 -9 662.70 -53.0 -52.9 -52.9 -99 -99 SPO 1997 10 31 23 47 11 4.0 -9 662.80 -53.0 -52.9 -52.8 -99 -99 SPO 1997 10 31 23 48 12 4.0 -9 662.80 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 49 12 3.9 -9 662.80 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 50 12 4.0 -9 662.80 -53.0 -52.8 -52.8 64 -99 SPO 1997 10 31 23 51 11 4.2 -9 662.80 -53.0 -52.8 -52.8 64 -99 SPO 1997 10 31 23 52 11 4.2 -9 662.80 -53.0 -52.8 -52.9 64 -99 SPO 1997 10 31 23 53 11 4.2 -9 662.80 -53.0 -52.8 -52.9 64 -99 SPO 1997 10 31 23 54 13 4.2 -9 662.80 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 55 14 4.3 -9 662.80 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 56 13 4.3 -9 662.80 -53.0 -52.9 -52.9 64 -99 SPO 1997 10 31 23 57 13 4.2 -9 662.80 -53.0 -53.0 -52.9 64 -99 SPO 1997 10 31 23 58 13 4.2 -9 662.80 -53.0 -53.0 -52.9 -99 -99 SPO 1997 10 31 23 59 13 4.2 -9 662.80 -53.0 -53.0 -52.9 -99 -99