SPO 1997 04 01 00 00 30 7.8 -9 670.20 -58.2 -57.5 -58.2 -99 0 SPO 1997 04 01 00 01 29 7.8 -9 670.20 -58.2 -57.6 -58.2 -99 -99 SPO 1997 04 01 00 02 29 7.7 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 03 29 7.9 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 04 29 7.8 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 05 28 7.9 -9 670.20 -58.1 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 06 29 7.8 -9 670.20 -58.1 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 07 28 7.7 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 08 28 8.0 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 09 28 8.1 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 10 28 7.7 -9 670.10 -58.0 -57.6 -58.0 -99 -99 SPO 1997 04 01 00 11 28 7.7 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 12 28 7.6 -9 670.20 -58.0 -57.6 -58.1 -99 -99 SPO 1997 04 01 00 13 28 7.5 -9 670.20 -58.0 -57.6 -58.1 61 -99 SPO 1997 04 01 00 14 27 7.8 -9 670.20 -58.0 -57.5 -58.0 61 -99 SPO 1997 04 01 00 15 27 7.3 -9 670.30 -57.9 -57.5 -58.0 61 -99 SPO 1997 04 01 00 16 27 7.3 -9 670.30 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 17 28 7.2 -9 670.30 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 18 28 6.8 -9 670.40 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 19 29 6.9 -9 670.40 -57.9 -57.5 -57.9 62 -99 SPO 1997 04 01 00 20 29 6.9 -9 670.40 -57.9 -57.5 -58.0 61 -99 SPO 1997 04 01 00 21 30 7.0 -9 670.40 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 01 00 22 30 6.8 -9 670.40 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 01 00 23 30 6.7 -9 670.40 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 01 00 24 30 6.6 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 25 30 6.9 -9 670.40 -58.0 -57.7 -58.0 61 -99 SPO 1997 04 01 00 26 29 6.6 -9 670.40 -57.9 -57.7 -58.1 60 -99 SPO 1997 04 01 00 27 29 6.5 -9 670.40 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 01 00 28 31 6.4 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 29 30 6.5 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 30 29 6.5 -9 670.40 -57.9 -57.7 -58.0 60 -99 SPO 1997 04 01 00 31 30 6.3 -9 670.50 -57.9 -57.7 -58.0 60 -99 SPO 1997 04 01 00 32 31 6.2 -9 670.50 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 33 31 6.0 -9 670.50 -58.0 -57.7 -58.1 60 -99 SPO 1997 04 01 00 34 32 6.0 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 35 33 5.9 -9 670.60 -58.0 -57.7 -58.0 59 -99 SPO 1997 04 01 00 36 34 5.7 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 37 33 5.8 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 38 34 5.7 -9 670.60 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 39 34 5.5 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 40 34 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 41 33 5.6 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 42 33 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 43 34 6.0 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 44 33 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 45 34 5.8 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 46 34 5.8 -9 670.60 -58.0 -57.8 -58.2 59 -99 SPO 1997 04 01 00 47 34 5.8 -9 670.60 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 48 34 5.8 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 49 34 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 50 33 5.7 -9 670.60 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 51 32 6.1 -9 670.60 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 52 31 6.2 -9 670.50 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 53 31 6.1 -9 670.50 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 54 30 6.6 -9 670.50 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 55 30 6.6 -9 670.50 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 56 30 6.8 -9 670.40 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 57 31 6.6 -9 670.50 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 58 31 6.5 -9 670.50 -58.1 -57.8 -58.1 60 -99 SPO 1997 04 01 00 59 31 6.7 -9 670.50 -58.1 -57.8 -58.2 59 -99 SPO 1997 04 01 01 00 32 6.3 -9 670.50 -58.1 -57.8 -58.2 60 0 SPO 1997 04 01 01 01 33 6.1 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 02 33 6.3 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 03 33 6.4 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 04 33 6.5 -9 670.50 -58.2 -57.8 -58.2 62 -99 SPO 1997 04 01 01 05 33 6.5 -9 670.40 -58.2 -57.8 -58.3 62 -99 SPO 1997 04 01 01 06 31 6.6 -9 670.40 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 07 32 6.5 -9 670.40 -58.2 -57.8 -58.3 61 -99 SPO 1997 04 01 01 08 31 6.3 -9 670.50 -58.2 -57.8 -58.3 61 -99 SPO 1997 04 01 01 09 32 6.2 -9 670.50 -58.2 -57.8 -58.3 60 -99 SPO 1997 04 01 01 10 32 6.0 -9 670.60 -58.2 -57.9 -58.3 60 -99 SPO 1997 04 01 01 11 33 5.9 -9 670.50 -58.2 -57.9 -58.3 60 -99 SPO 1997 04 01 01 12 33 5.9 -9 670.50 -58.3 -58.0 -58.3 61 -99 SPO 1997 04 01 01 13 33 6.1 -9 670.50 -58.3 -58.0 -58.3 62 -99 SPO 1997 04 01 01 14 34 6.4 -9 670.50 -58.3 -57.9 -58.3 62 -99 SPO 1997 04 01 01 15 34 6.0 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 16 34 6.2 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 17 34 6.2 -9 670.50 -58.3 -58.0 -58.3 62 -99 SPO 1997 04 01 01 18 35 6.2 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 19 35 6.1 -9 670.50 -58.3 -57.9 -58.4 61 -99 SPO 1997 04 01 01 20 36 6.0 -9 670.50 -58.3 -57.9 -58.4 61 -99 SPO 1997 04 01 01 21 36 5.9 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 22 38 5.6 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 23 38 5.5 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 24 39 5.5 -9 670.70 -58.4 -58.0 -58.4 60 -99 SPO 1997 04 01 01 25 39 5.5 -9 670.70 -58.4 -58.0 -58.5 61 -99 SPO 1997 04 01 01 26 38 5.3 -9 670.70 -58.4 -58.1 -58.5 61 -99 SPO 1997 04 01 01 27 38 5.3 -9 670.70 -58.4 -58.1 -58.5 62 -99 SPO 1997 04 01 01 28 38 5.4 -9 670.70 -58.4 -58.1 -58.5 62 -99 SPO 1997 04 01 01 29 36 5.6 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 30 36 5.6 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 31 36 5.9 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 32 35 6.2 -9 670.60 -58.5 -58.0 -58.5 62 -99 SPO 1997 04 01 01 33 35 6.1 -9 670.50 -58.5 -58.1 -58.5 61 -99 SPO 1997 04 01 01 34 36 6.2 -9 670.50 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 35 35 6.2 -9 670.60 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 36 36 6.5 -9 670.60 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 37 36 6.3 -9 670.50 -58.5 -58.0 -58.6 61 -99 SPO 1997 04 01 01 38 37 6.0 -9 670.60 -58.5 -58.0 -58.6 61 -99 SPO 1997 04 01 01 39 39 5.8 -9 670.60 -58.6 -58.1 -58.7 61 -99 SPO 1997 04 01 01 40 40 5.5 -9 670.60 -58.6 -58.1 -58.7 60 -99 SPO 1997 04 01 01 41 39 5.6 -9 670.60 -58.7 -58.2 -58.8 60 -99 SPO 1997 04 01 01 42 38 5.5 -9 670.60 -58.7 -58.2 -58.8 61 -99 SPO 1997 04 01 01 43 38 5.9 -9 670.60 -58.7 -58.2 -58.8 60 -99 SPO 1997 04 01 01 44 39 5.7 -9 670.60 -58.8 -58.2 -58.8 61 -99 SPO 1997 04 01 01 45 40 6.0 -9 670.60 -58.8 -58.3 -58.9 61 -99 SPO 1997 04 01 01 46 40 6.0 -9 670.50 -58.9 -58.3 -58.9 61 -99 SPO 1997 04 01 01 47 40 6.0 -9 670.50 -58.9 -58.4 -59.0 61 -99 SPO 1997 04 01 01 48 39 5.9 -9 670.50 -59.0 -58.4 -59.1 62 -99 SPO 1997 04 01 01 49 40 5.8 -9 670.50 -59.0 -58.4 -59.1 61 -99 SPO 1997 04 01 01 50 41 5.7 -9 670.50 -59.0 -58.4 -59.1 61 -99 SPO 1997 04 01 01 51 41 5.7 -9 670.60 -59.1 -58.4 -59.2 61 -99 SPO 1997 04 01 01 52 42 5.8 -9 670.60 -59.2 -58.4 -59.2 61 -99 SPO 1997 04 01 01 53 42 5.6 -9 670.50 -59.2 -58.4 -59.3 59 -99 SPO 1997 04 01 01 54 44 5.5 -9 670.50 -59.2 -58.4 -59.3 59 -99 SPO 1997 04 01 01 55 45 5.6 -9 670.50 -59.3 -58.5 -59.4 59 -99 SPO 1997 04 01 01 56 46 5.8 -9 670.60 -59.4 -58.5 -59.4 59 -99 SPO 1997 04 01 01 57 45 5.6 -9 670.50 -59.4 -58.6 -59.5 58 -99 SPO 1997 04 01 01 58 47 5.6 -9 670.60 -59.4 -58.6 -59.5 59 -99 SPO 1997 04 01 01 59 48 5.4 -9 670.50 -59.6 -58.7 -59.6 60 -99 SPO 1997 04 01 02 00 47 5.5 -9 670.60 -59.6 -58.7 -59.7 60 0 SPO 1997 04 01 02 01 45 5.7 -9 670.60 -59.7 -58.7 -59.7 60 -99 SPO 1997 04 01 02 02 47 5.5 -9 670.60 -59.7 -58.7 -59.7 60 -99 SPO 1997 04 01 02 03 47 5.4 -9 670.60 -59.7 -58.7 -59.8 60 -99 SPO 1997 04 01 02 04 47 5.4 -9 670.60 -59.8 -58.8 -59.8 60 -99 SPO 1997 04 01 02 05 48 5.0 -9 670.60 -59.8 -58.8 -59.8 59 -99 SPO 1997 04 01 02 06 47 5.0 -9 670.60 -59.8 -58.8 -59.9 59 -99 SPO 1997 04 01 02 07 49 5.2 -9 670.60 -59.9 -58.8 -59.9 60 -99 SPO 1997 04 01 02 08 48 5.2 -9 670.60 -60.0 -58.8 -60.0 60 -99 SPO 1997 04 01 02 09 47 5.2 -9 670.60 -60.0 -58.8 -60.1 60 -99 SPO 1997 04 01 02 10 48 5.2 -9 670.60 -60.1 -58.8 -60.1 60 -99 SPO 1997 04 01 02 11 47 5.2 -9 670.60 -60.1 -58.9 -60.1 60 -99 SPO 1997 04 01 02 12 46 5.1 -9 670.60 -60.1 -58.9 -60.1 59 -99 SPO 1997 04 01 02 13 45 5.2 -9 670.60 -60.1 -59.0 -60.1 59 -99 SPO 1997 04 01 02 14 45 5.1 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 15 46 5.0 -9 670.60 -60.1 -59.0 -60.0 60 -99 SPO 1997 04 01 02 16 47 5.0 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 17 48 5.1 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 18 48 5.2 -9 670.50 -60.1 -59.0 -60.2 60 -99 SPO 1997 04 01 02 19 47 5.3 -9 670.60 -60.1 -59.0 -60.2 60 -99 SPO 1997 04 01 02 20 47 5.2 -9 670.50 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 21 45 5.3 -9 670.50 -60.2 -59.0 -60.3 60 -99 SPO 1997 04 01 02 22 46 5.1 -9 670.60 -60.2 -59.0 -60.3 60 -99 SPO 1997 04 01 02 23 45 5.1 -9 670.50 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 24 46 5.2 -9 670.60 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 25 47 5.2 -9 670.60 -60.2 -58.9 -60.2 60 -99 SPO 1997 04 01 02 26 49 5.1 -9 670.60 -60.2 -58.9 -60.3 60 -99 SPO 1997 04 01 02 27 51 5.0 -9 670.60 -60.2 -59.0 -60.3 59 -99 SPO 1997 04 01 02 28 52 5.0 -9 670.60 -60.2 -59.0 -60.4 59 -99 SPO 1997 04 01 02 29 53 4.7 -9 670.60 -60.3 -59.2 -60.4 59 -99 SPO 1997 04 01 02 30 52 5.0 -9 670.60 -60.3 -59.2 -60.4 59 -99 SPO 1997 04 01 02 31 52 5.0 -9 670.60 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 02 32 50 5.2 -9 670.60 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 02 33 48 5.4 -9 670.60 -60.4 -59.2 -60.4 61 -99 SPO 1997 04 01 02 34 47 5.7 -9 670.50 -60.4 -59.1 -60.4 61 -99 SPO 1997 04 01 02 35 47 5.8 -9 670.50 -60.3 -59.1 -60.4 61 -99 SPO 1997 04 01 02 36 48 5.9 -9 670.50 -60.3 -59.0 -60.3 61 -99 SPO 1997 04 01 02 37 49 5.7 -9 670.60 -60.3 -59.0 -60.4 61 -99 SPO 1997 04 01 02 38 51 5.4 -9 670.60 -60.4 -59.1 -60.5 60 -99 SPO 1997 04 01 02 39 53 5.1 -9 670.60 -60.5 -59.2 -60.6 59 -99 SPO 1997 04 01 02 40 55 5.0 -9 670.60 -60.5 -59.2 -60.6 59 -99 SPO 1997 04 01 02 41 58 4.7 -9 670.70 -60.6 -59.2 -60.6 59 -99 SPO 1997 04 01 02 42 60 4.5 -9 670.70 -60.6 -59.3 -60.7 59 -99 SPO 1997 04 01 02 43 61 4.5 -9 670.70 -60.7 -59.4 -60.7 59 -99 SPO 1997 04 01 02 44 60 4.7 -9 670.70 -60.7 -59.4 -60.8 59 -99 SPO 1997 04 01 02 45 58 4.9 -9 670.60 -60.8 -59.5 -60.8 59 -99 SPO 1997 04 01 02 46 56 5.2 -9 670.60 -60.8 -59.5 -60.9 59 -99 SPO 1997 04 01 02 47 56 5.3 -9 670.60 -60.9 -59.4 -60.9 60 -99 SPO 1997 04 01 02 48 56 5.1 -9 670.60 -61.0 -59.4 -61.0 61 -99 SPO 1997 04 01 02 49 58 5.1 -9 670.60 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 02 50 59 5.0 -9 670.70 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 02 51 61 4.7 -9 670.70 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 02 52 61 4.6 -9 670.70 -61.1 -59.4 -61.1 59 -99 SPO 1997 04 01 02 53 60 4.8 -9 670.70 -61.1 -59.5 -61.1 59 -99 SPO 1997 04 01 02 54 59 5.0 -9 670.70 -61.2 -59.5 -61.2 60 -99 SPO 1997 04 01 02 55 58 5.2 -9 670.60 -61.2 -59.4 -61.2 60 -99 SPO 1997 04 01 02 56 57 5.2 -9 670.60 -61.3 -59.4 -61.3 60 -99 SPO 1997 04 01 02 57 56 5.3 -9 670.60 -61.2 -59.5 -61.3 59 -99 SPO 1997 04 01 02 58 55 5.4 -9 670.60 -61.3 -59.5 -61.4 59 -99 SPO 1997 04 01 02 59 54 5.4 -9 670.60 -61.3 -59.5 -61.4 59 -99 SPO 1997 04 01 03 00 54 5.5 -9 670.60 -61.4 -59.5 -61.4 59 0 SPO 1997 04 01 03 01 54 5.4 -9 670.50 -61.4 -59.6 -61.4 59 -99 SPO 1997 04 01 03 02 55 5.7 -9 670.60 -61.4 -59.5 -61.5 58 -99 SPO 1997 04 01 03 03 53 5.6 -9 670.60 -61.5 -59.4 -61.5 59 -99 SPO 1997 04 01 03 04 52 5.4 -9 670.60 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 05 54 5.4 -9 670.60 -61.5 -59.5 -61.5 58 -99 SPO 1997 04 01 03 06 56 5.2 -9 670.60 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 07 56 5.0 -9 670.70 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 08 57 4.6 -9 670.70 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 09 57 4.5 -9 670.70 -61.5 -59.7 -61.5 59 -99 SPO 1997 04 01 03 10 60 4.6 -9 670.70 -61.5 -59.7 -61.5 60 -99 SPO 1997 04 01 03 11 58 4.6 -9 670.80 -61.5 -59.8 -61.6 59 -99 SPO 1997 04 01 03 12 59 4.7 -9 670.80 -61.5 -59.7 -61.6 59 -99 SPO 1997 04 01 03 13 58 4.8 -9 670.70 -61.5 -59.7 -61.6 58 -99 SPO 1997 04 01 03 14 56 5.0 -9 670.80 -61.6 -59.6 -61.6 58 -99 SPO 1997 04 01 03 15 55 5.1 -9 670.70 -61.6 -59.6 -61.6 58 -99 SPO 1997 04 01 03 16 52 5.2 -9 670.70 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 03 17 50 5.3 -9 670.70 -61.6 -59.6 -61.7 58 -99 SPO 1997 04 01 03 18 49 5.6 -9 670.70 -61.7 -59.6 -61.7 59 -99 SPO 1997 04 01 03 19 47 5.6 -9 670.60 -61.7 -59.5 -61.7 59 -99 SPO 1997 04 01 03 20 47 5.6 -9 670.60 -61.7 -59.4 -61.7 60 -99 SPO 1997 04 01 03 21 47 5.6 -9 670.70 -61.7 -59.4 -61.7 60 -99 SPO 1997 04 01 03 22 48 5.5 -9 670.70 -61.6 -59.4 -61.7 60 -99 SPO 1997 04 01 03 23 47 5.5 -9 670.70 -61.6 -59.5 -61.7 59 -99 SPO 1997 04 01 03 24 47 5.6 -9 670.70 -61.6 -59.4 -61.7 59 -99 SPO 1997 04 01 03 25 48 5.7 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 26 48 5.7 -9 670.60 -61.6 -59.3 -61.7 59 -99 SPO 1997 04 01 03 27 48 5.7 -9 670.60 -61.5 -59.3 -61.7 58 -99 SPO 1997 04 01 03 28 48 5.7 -9 670.60 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 29 48 5.7 -9 670.60 -61.6 -59.2 -61.7 58 -99 SPO 1997 04 01 03 30 48 5.6 -9 670.60 -61.6 -59.2 -61.7 59 -99 SPO 1997 04 01 03 31 48 5.6 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 32 47 5.8 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 33 48 5.6 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 34 47 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 35 47 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 36 46 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 37 46 5.6 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 38 45 5.7 -9 670.60 -61.5 -59.2 -61.6 59 -99 SPO 1997 04 01 03 39 44 5.8 -9 670.60 -61.5 -59.2 -61.5 59 -99 SPO 1997 04 01 03 40 44 5.9 -9 670.60 -61.4 -59.2 -61.5 58 -99 SPO 1997 04 01 03 41 43 6.1 -9 670.60 -61.4 -59.1 -61.5 59 -99 SPO 1997 04 01 03 42 44 6.2 -9 670.60 -61.4 -59.1 -61.5 60 -99 SPO 1997 04 01 03 43 45 6.2 -9 670.60 -61.3 -59.1 -61.4 59 -99 SPO 1997 04 01 03 44 45 5.9 -9 670.60 -61.3 -59.1 -61.4 59 -99 SPO 1997 04 01 03 45 46 5.8 -9 670.60 -61.3 -59.2 -61.4 59 -99 SPO 1997 04 01 03 46 47 5.6 -9 670.60 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 03 47 46 5.5 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 48 45 5.6 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 49 46 5.7 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 50 46 5.7 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 51 46 5.6 -9 670.60 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 03 52 47 5.6 -9 670.70 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 03 53 48 5.2 -9 670.70 -61.2 -59.5 -61.3 59 -99 SPO 1997 04 01 03 54 48 5.3 -9 670.70 -61.1 -59.5 -61.3 59 -99 SPO 1997 04 01 03 55 48 5.2 -9 670.80 -61.1 -59.5 -61.2 59 -99 SPO 1997 04 01 03 56 48 5.3 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 57 47 5.4 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 58 47 5.4 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 59 46 5.2 -9 670.80 -61.0 -59.5 -61.2 59 -99 SPO 1997 04 01 04 00 47 5.2 -9 670.80 -61.0 -59.4 -61.2 59 0 SPO 1997 04 01 04 01 48 5.1 -9 670.80 -61.0 -59.4 -61.2 59 -99 SPO 1997 04 01 04 02 48 5.0 -9 670.80 -61.0 -59.5 -61.2 59 -99 SPO 1997 04 01 04 03 49 5.0 -9 670.80 -61.0 -59.5 -61.1 59 -99 SPO 1997 04 01 04 04 48 5.4 -9 670.80 -61.0 -59.5 -61.2 60 -99 SPO 1997 04 01 04 05 46 5.6 -9 670.70 -61.0 -59.5 -61.2 60 -99 SPO 1997 04 01 04 06 45 5.9 -9 670.70 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 04 07 44 6.0 -9 670.60 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 04 08 43 6.2 -9 670.60 -60.9 -59.4 -61.0 59 -99 SPO 1997 04 01 04 09 43 6.3 -9 670.60 -60.9 -59.3 -61.0 59 -99 SPO 1997 04 01 04 10 43 6.4 -9 670.60 -60.9 -59.3 -61.0 59 -99 SPO 1997 04 01 04 11 43 6.5 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 12 43 6.5 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 13 42 6.6 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 14 42 6.7 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 15 41 6.7 -9 670.60 -60.8 -59.1 -60.9 59 -99 SPO 1997 04 01 04 16 40 6.8 -9 670.60 -60.8 -59.2 -60.9 60 -99 SPO 1997 04 01 04 17 39 7.0 -9 670.60 -60.8 -59.2 -60.8 60 -99 SPO 1997 04 01 04 18 39 7.1 -9 670.50 -60.7 -59.2 -60.8 61 -99 SPO 1997 04 01 04 19 40 6.9 -9 670.60 -60.7 -59.0 -60.8 61 -99 SPO 1997 04 01 04 20 39 7.0 -9 670.60 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 21 40 6.9 -9 670.60 -60.6 -59.0 -60.7 60 -99 SPO 1997 04 01 04 22 39 7.0 -9 670.60 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 23 39 7.0 -9 670.50 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 24 39 7.1 -9 670.50 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 25 39 7.1 -9 670.50 -60.5 -59.1 -60.6 59 -99 SPO 1997 04 01 04 26 40 7.3 -9 670.40 -60.5 -59.1 -60.6 60 -99 SPO 1997 04 01 04 27 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 28 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 29 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 30 41 7.3 -9 670.40 -60.4 -59.0 -60.5 60 -99 SPO 1997 04 01 04 31 41 7.1 -9 670.40 -60.4 -59.1 -60.5 60 -99 SPO 1997 04 01 04 32 41 7.3 -9 670.40 -60.4 -59.2 -60.5 60 -99 SPO 1997 04 01 04 33 41 7.1 -9 670.40 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 04 34 41 7.1 -9 670.50 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 04 35 41 7.0 -9 670.50 -60.3 -59.2 -60.4 60 -99 SPO 1997 04 01 04 36 41 7.1 -9 670.40 -60.3 -59.2 -60.4 60 -99 SPO 1997 04 01 04 37 41 6.9 -9 670.50 -60.3 -59.2 -60.4 61 -99 SPO 1997 04 01 04 38 43 6.9 -9 670.50 -60.3 -59.2 -60.3 62 -99 SPO 1997 04 01 04 39 43 6.7 -9 670.50 -60.2 -59.2 -60.3 61 -99 SPO 1997 04 01 04 40 42 6.3 -9 670.50 -60.2 -59.2 -60.3 61 -99 SPO 1997 04 01 04 41 43 6.2 -9 670.60 -60.2 -59.2 -60.3 62 -99 SPO 1997 04 01 04 42 42 5.9 -9 670.60 -60.1 -59.3 -60.3 61 -99 SPO 1997 04 01 04 43 43 5.6 -9 670.60 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 44 44 5.7 -9 670.60 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 45 45 5.6 -9 670.70 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 46 45 5.6 -9 670.70 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 47 45 5.9 -9 670.60 -60.0 -59.4 -60.1 60 -99 SPO 1997 04 01 04 48 44 6.2 -9 670.60 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 49 43 6.2 -9 670.60 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 50 42 6.6 -9 670.60 -60.0 -59.3 -60.0 61 -99 SPO 1997 04 01 04 51 41 6.5 -9 670.60 -59.9 -59.3 -60.0 61 -99 SPO 1997 04 01 04 52 39 6.8 -9 670.50 -59.9 -59.2 -60.0 61 -99 SPO 1997 04 01 04 53 38 7.0 -9 670.50 -59.9 -59.2 -59.9 61 -99 SPO 1997 04 01 04 54 38 6.9 -9 670.50 -59.8 -59.1 -59.8 60 -99 SPO 1997 04 01 04 55 37 7.1 -9 670.50 -59.8 -59.0 -59.8 60 -99 SPO 1997 04 01 04 56 35 7.1 -9 670.50 -59.7 -58.9 -59.7 60 -99 SPO 1997 04 01 04 57 37 6.7 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 04 58 38 6.8 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 04 59 38 6.7 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 05 00 37 7.1 -9 670.50 -59.6 -58.8 -59.7 61 0 SPO 1997 04 01 05 01 36 7.2 -9 670.50 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 02 37 7.1 -9 670.50 -59.4 -58.7 -59.5 61 -99 SPO 1997 04 01 05 03 35 7.1 -9 670.40 -59.4 -58.7 -59.5 61 -99 SPO 1997 04 01 05 04 36 7.3 -9 670.40 -59.4 -58.8 -59.4 62 -99 SPO 1997 04 01 05 05 34 7.3 -9 670.50 -59.4 -58.7 -59.4 62 -99 SPO 1997 04 01 05 06 35 7.5 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 07 35 7.0 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 08 33 6.9 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 09 32 7.2 -9 670.60 -59.3 -58.6 -59.3 61 -99 SPO 1997 04 01 05 10 32 7.0 -9 670.50 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 11 32 6.9 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 12 32 6.8 -9 670.60 -59.2 -58.6 -59.2 62 -99 SPO 1997 04 01 05 13 33 6.7 -9 670.60 -59.1 -58.6 -59.3 61 -99 SPO 1997 04 01 05 14 35 6.5 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 15 35 6.5 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 16 35 6.2 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 17 35 6.4 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 18 36 6.1 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 19 36 6.0 -9 670.60 -59.2 -58.8 -59.3 61 -99 SPO 1997 04 01 05 20 37 6.2 -9 670.70 -59.2 -58.8 -59.3 60 -99 SPO 1997 04 01 05 21 37 5.9 -9 670.70 -59.2 -58.8 -59.4 60 -99 SPO 1997 04 01 05 22 38 5.8 -9 670.70 -59.3 -58.8 -59.3 61 -99 SPO 1997 04 01 05 23 38 5.7 -9 670.70 -59.3 -58.8 -59.4 61 -99 SPO 1997 04 01 05 24 39 5.5 -9 670.70 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 25 39 5.7 -9 670.70 -59.2 -58.8 -59.4 61 -99 SPO 1997 04 01 05 26 39 5.8 -9 670.70 -59.2 -58.8 -59.4 62 -99 SPO 1997 04 01 05 27 37 6.1 -9 670.60 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 28 35 6.0 -9 670.60 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 29 35 6.4 -9 670.60 -59.3 -58.8 -59.3 61 -99 SPO 1997 04 01 05 30 36 6.2 -9 670.60 -59.2 -58.7 -59.3 61 -99 SPO 1997 04 01 05 31 36 6.1 -9 670.60 -59.2 -58.7 -59.3 60 -99 SPO 1997 04 01 05 32 35 6.2 -9 670.60 -59.2 -58.7 -59.3 59 -99 SPO 1997 04 01 05 33 40 5.5 -9 670.70 -59.2 -58.8 -59.3 60 -99 SPO 1997 04 01 05 34 40 5.4 -9 670.70 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 35 42 4.9 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 36 42 4.5 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 37 42 4.3 -9 670.80 -59.3 -59.0 -59.4 61 -99 SPO 1997 04 01 05 38 39 4.5 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 39 44 4.7 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 40 41 4.4 -9 670.80 -59.3 -59.0 -59.4 61 -99 SPO 1997 04 01 05 41 39 4.9 -9 670.80 -59.3 -59.0 -59.5 60 -99 SPO 1997 04 01 05 42 38 5.0 -9 670.80 -59.4 -59.0 -59.5 60 -99 SPO 1997 04 01 05 43 39 4.8 -9 670.80 -59.4 -59.0 -59.5 59 -99 SPO 1997 04 01 05 44 39 4.9 -9 670.80 -59.4 -59.0 -59.5 59 -99 SPO 1997 04 01 05 45 39 4.7 -9 670.80 -59.5 -59.0 -59.6 61 -99 SPO 1997 04 01 05 46 40 4.9 -9 670.80 -59.5 -59.0 -59.6 61 -99 SPO 1997 04 01 05 47 41 5.3 -9 670.80 -59.5 -58.9 -59.6 61 -99 SPO 1997 04 01 05 48 40 5.4 -9 670.80 -59.5 -58.9 -59.5 61 -99 SPO 1997 04 01 05 49 40 5.4 -9 670.80 -59.4 -58.8 -59.5 60 -99 SPO 1997 04 01 05 50 39 5.6 -9 670.70 -59.5 -58.8 -59.5 61 -99 SPO 1997 04 01 05 51 37 6.1 -9 670.80 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 52 37 6.0 -9 670.70 -59.4 -58.8 -59.4 59 -99 SPO 1997 04 01 05 53 36 6.1 -9 670.70 -59.4 -58.8 -59.4 59 -99 SPO 1997 04 01 05 54 37 6.3 -9 670.60 -59.4 -58.8 -59.6 59 -99 SPO 1997 04 01 05 55 36 6.4 -9 670.60 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 56 36 6.5 -9 670.60 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 57 36 6.4 -9 670.70 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 58 36 6.0 -9 670.70 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 59 39 5.5 -9 670.80 -59.5 -58.8 -59.6 61 -99 SPO 1997 04 01 06 00 42 5.0 -9 670.80 -59.5 -58.8 -59.6 61 0 SPO 1997 04 01 06 01 45 4.9 -9 670.80 -59.5 -58.8 -59.6 61 -99 SPO 1997 04 01 06 02 45 4.4 -9 670.90 -59.6 -58.8 -59.6 62 -99 SPO 1997 04 01 06 03 48 4.2 -9 670.90 -59.6 -58.8 -59.6 60 -99 SPO 1997 04 01 06 04 49 4.3 -9 670.90 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 06 05 46 4.4 -9 670.80 -59.6 -58.9 -59.7 59 -99 SPO 1997 04 01 06 06 45 5.1 -9 670.80 -59.7 -58.9 -59.7 59 -99 SPO 1997 04 01 06 07 44 5.3 -9 670.80 -59.7 -58.9 -59.8 59 -99 SPO 1997 04 01 06 08 43 5.5 -9 670.80 -59.8 -58.9 -59.8 60 -99 SPO 1997 04 01 06 09 41 5.8 -9 670.70 -59.8 -58.9 -59.9 60 -99 SPO 1997 04 01 06 10 40 5.9 -9 670.80 -59.8 -58.9 -59.9 60 -99 SPO 1997 04 01 06 11 39 5.8 -9 670.80 -59.9 -58.9 -60.0 61 -99 SPO 1997 04 01 06 12 40 5.6 -9 670.80 -59.9 -58.9 -60.0 61 -99 SPO 1997 04 01 06 13 42 5.2 -9 670.80 -59.9 -58.8 -60.0 61 -99 SPO 1997 04 01 06 14 46 4.8 -9 670.90 -59.9 -58.9 -60.0 60 -99 SPO 1997 04 01 06 15 51 4.3 -9 670.90 -60.0 -58.9 -60.0 60 -99 SPO 1997 04 01 06 16 54 3.9 -9 671.00 -60.0 -59.0 -60.0 60 -99 SPO 1997 04 01 06 17 59 3.5 -9 671.00 -60.0 -59.2 -60.0 60 -99 SPO 1997 04 01 06 18 61 3.6 -9 671.00 -60.2 -59.2 -60.2 60 -99 SPO 1997 04 01 06 19 60 3.5 -9 671.00 -60.3 -59.3 -60.4 60 -99 SPO 1997 04 01 06 20 54 4.2 -9 670.90 -60.5 -59.3 -60.5 59 -99 SPO 1997 04 01 06 21 49 4.4 -9 670.80 -60.6 -59.3 -60.5 59 -99 SPO 1997 04 01 06 22 47 4.7 -9 670.80 -60.6 -59.3 -60.6 59 -99 SPO 1997 04 01 06 23 46 4.8 -9 670.80 -60.7 -59.3 -60.7 59 -99 SPO 1997 04 01 06 24 48 4.8 -9 670.80 -60.8 -59.3 -60.8 60 -99 SPO 1997 04 01 06 25 49 4.8 -9 670.80 -60.9 -59.4 -60.9 60 -99 SPO 1997 04 01 06 26 50 4.7 -9 670.80 -60.9 -59.4 -60.9 59 -99 SPO 1997 04 01 06 27 50 4.6 -9 670.80 -61.0 -59.4 -60.9 59 -99 SPO 1997 04 01 06 28 53 4.4 -9 670.80 -61.0 -59.4 -60.9 59 -99 SPO 1997 04 01 06 29 53 4.5 -9 670.80 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 06 30 53 4.4 -9 670.90 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 06 31 53 4.4 -9 670.90 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 32 52 4.4 -9 671.00 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 33 50 4.6 -9 671.00 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 34 49 4.7 -9 671.00 -61.1 -59.4 -61.0 60 -99 SPO 1997 04 01 06 35 49 4.8 -9 670.90 -61.0 -59.3 -61.0 59 -99 SPO 1997 04 01 06 36 49 4.9 -9 670.90 -61.1 -59.3 -61.1 59 -99 SPO 1997 04 01 06 37 49 5.0 -9 670.90 -61.1 -59.4 -61.1 59 -99 SPO 1997 04 01 06 38 50 4.9 -9 670.90 -61.1 -59.4 -61.2 59 -99 SPO 1997 04 01 06 39 50 4.9 -9 670.90 -61.2 -59.4 -61.2 59 -99 SPO 1997 04 01 06 40 50 4.8 -9 671.00 -61.2 -59.5 -61.2 59 -99 SPO 1997 04 01 06 41 51 4.7 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 42 53 4.6 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 43 55 4.6 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 44 55 4.5 -9 671.00 -61.3 -59.6 -61.3 60 -99 SPO 1997 04 01 06 45 54 4.5 -9 671.00 -61.3 -59.5 -61.4 60 -99 SPO 1997 04 01 06 46 54 4.6 -9 671.00 -61.3 -59.5 -61.4 60 -99 SPO 1997 04 01 06 47 51 4.8 -9 671.00 -61.4 -59.4 -61.4 61 -99 SPO 1997 04 01 06 48 50 4.8 -9 671.00 -61.4 -59.4 -61.4 61 -99 SPO 1997 04 01 06 49 48 5.2 -9 670.90 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 06 50 47 5.3 -9 670.90 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 06 51 46 5.5 -9 670.80 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 06 52 47 5.6 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 53 45 5.8 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 54 42 5.9 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 55 44 5.5 -9 670.80 -61.2 -59.4 -61.2 59 -99 SPO 1997 04 01 06 56 44 5.7 -9 670.80 -61.2 -59.4 -61.2 60 -99 SPO 1997 04 01 06 57 45 5.6 -9 670.90 -61.2 -59.4 -61.3 60 -99 SPO 1997 04 01 06 58 45 5.6 -9 670.80 -61.2 -59.4 -61.3 60 -99 SPO 1997 04 01 06 59 44 5.5 -9 670.90 -61.2 -59.4 -61.4 60 -99 SPO 1997 04 01 07 00 44 5.8 -9 670.80 -61.2 -59.3 -61.4 59 0 SPO 1997 04 01 07 01 43 5.9 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 02 43 5.9 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 03 43 6.0 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 04 42 6.0 -9 670.80 -61.2 -59.3 -61.3 59 -99 SPO 1997 04 01 07 05 42 6.1 -9 670.80 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 06 43 6.1 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 07 43 6.2 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 08 43 6.1 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 09 44 6.0 -9 670.90 -61.1 -59.4 -61.2 60 -99 SPO 1997 04 01 07 10 44 6.0 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 11 44 6.0 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 12 44 5.9 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 13 43 6.1 -9 670.80 -61.1 -59.4 -61.1 61 -99 SPO 1997 04 01 07 14 43 6.0 -9 670.80 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 07 15 43 5.9 -9 670.80 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 07 16 44 5.8 -9 670.80 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 07 17 44 5.9 -9 670.80 -60.9 -59.4 -61.0 60 -99 SPO 1997 04 01 07 18 44 5.7 -9 670.80 -60.9 -59.4 -61.0 60 -99 SPO 1997 04 01 07 19 43 5.6 -9 670.80 -60.8 -59.4 -60.9 60 -99 SPO 1997 04 01 07 20 44 5.6 -9 670.90 -60.8 -59.4 -60.9 60 -99 SPO 1997 04 01 07 21 44 5.7 -9 670.90 -60.8 -59.3 -60.9 60 -99 SPO 1997 04 01 07 22 44 5.6 -9 670.90 -60.7 -59.3 -60.8 59 -99 SPO 1997 04 01 07 23 44 5.3 -9 670.90 -60.7 -59.4 -60.8 59 -99 SPO 1997 04 01 07 24 45 5.2 -9 671.00 -60.6 -59.4 -60.7 59 -99 SPO 1997 04 01 07 25 46 5.2 -9 671.00 -60.6 -59.5 -60.7 59 -99 SPO 1997 04 01 07 26 48 5.1 -9 671.00 -60.6 -59.5 -60.7 59 -99 SPO 1997 04 01 07 27 47 4.7 -9 671.00 -60.6 -59.5 -60.7 60 -99 SPO 1997 04 01 07 28 48 5.0 -9 671.00 -60.6 -59.5 -60.7 61 -99 SPO 1997 04 01 07 29 49 4.5 -9 671.00 -60.6 -59.5 -60.7 61 -99 SPO 1997 04 01 07 30 50 4.5 -9 671.10 -60.5 -59.5 -60.7 60 -99 SPO 1997 04 01 07 31 54 4.2 -9 671.10 -60.6 -59.6 -60.7 62 -99 SPO 1997 04 01 07 32 57 3.9 -9 671.10 -60.6 -59.6 -60.7 62 -99 SPO 1997 04 01 07 33 60 3.6 -9 671.10 -60.6 -59.6 -60.8 62 -99 SPO 1997 04 01 07 34 63 3.4 -9 671.10 -60.7 -59.7 -60.8 61 -99 SPO 1997 04 01 07 35 63 3.5 -9 671.10 -60.8 -59.8 -60.9 60 -99 SPO 1997 04 01 07 36 60 3.7 -9 671.10 -60.9 -59.8 -61.0 60 -99 SPO 1997 04 01 07 37 58 3.8 -9 671.10 -60.9 -59.8 -61.0 59 -99 SPO 1997 04 01 07 38 57 4.0 -9 671.10 -61.0 -59.8 -61.0 59 -99 SPO 1997 04 01 07 39 56 4.1 -9 671.10 -61.0 -59.8 -61.1 59 -99 SPO 1997 04 01 07 40 57 4.2 -9 671.20 -61.1 -59.9 -61.2 59 -99 SPO 1997 04 01 07 41 59 3.9 -9 671.20 -61.2 -59.9 -61.2 60 -99 SPO 1997 04 01 07 42 62 3.8 -9 671.20 -61.2 -60.0 -61.3 59 -99 SPO 1997 04 01 07 43 67 3.6 -9 671.30 -61.3 -60.0 -61.3 59 -99 SPO 1997 04 01 07 44 68 3.6 -9 671.30 -61.4 -60.0 -61.4 60 -99 SPO 1997 04 01 07 45 70 3.5 -9 671.40 -61.4 -60.1 -61.4 59 -99 SPO 1997 04 01 07 46 70 3.5 -9 671.30 -61.4 -60.0 -61.4 58 -99 SPO 1997 04 01 07 47 68 3.7 -9 671.30 -61.5 -60.0 -61.4 59 -99 SPO 1997 04 01 07 48 68 3.8 -9 671.30 -61.5 -60.1 -61.5 59 -99 SPO 1997 04 01 07 49 67 3.9 -9 671.30 -61.6 -60.1 -61.5 60 -99 SPO 1997 04 01 07 50 67 4.1 -9 671.30 -61.6 -60.1 -61.6 59 -99 SPO 1997 04 01 07 51 66 4.1 -9 671.30 -61.6 -60.1 -61.6 60 -99 SPO 1997 04 01 07 52 67 4.2 -9 671.30 -61.6 -60.0 -61.6 60 -99 SPO 1997 04 01 07 53 68 4.1 -9 671.30 -61.7 -60.0 -61.7 59 -99 SPO 1997 04 01 07 54 71 3.8 -9 671.30 -61.7 -60.0 -61.7 59 -99 SPO 1997 04 01 07 55 73 3.7 -9 671.40 -61.8 -60.1 -61.8 59 -99 SPO 1997 04 01 07 56 74 3.6 -9 671.40 -61.8 -60.2 -61.8 59 -99 SPO 1997 04 01 07 57 74 3.7 -9 671.40 -61.9 -60.2 -61.9 59 -99 SPO 1997 04 01 07 58 75 3.8 -9 671.30 -62.0 -60.3 -61.9 58 -99 SPO 1997 04 01 07 59 75 4.0 -9 671.30 -62.0 -60.3 -62.0 58 -99 SPO 1997 04 01 08 00 75 4.1 -9 671.30 -62.0 -60.3 -62.0 58 0 SPO 1997 04 01 08 01 73 4.1 -9 671.30 -62.1 -60.3 -62.0 59 -99 SPO 1997 04 01 08 02 74 4.0 -9 671.30 -62.1 -60.2 -62.0 59 -99 SPO 1997 04 01 08 03 73 4.0 -9 671.40 -62.0 -60.0 -62.0 59 -99 SPO 1997 04 01 08 04 73 4.0 -9 671.40 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 08 05 72 3.9 -9 671.40 -61.8 -59.9 -61.9 59 -99 SPO 1997 04 01 08 06 70 4.1 -9 671.40 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 07 68 4.4 -9 671.30 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 08 65 4.7 -9 671.30 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 09 63 4.8 -9 671.30 -61.8 -59.7 -61.9 58 -99 SPO 1997 04 01 08 10 62 4.8 -9 671.30 -61.8 -59.7 -61.9 58 -99 SPO 1997 04 01 08 11 62 4.8 -9 671.30 -61.8 -59.8 -61.9 58 -99 SPO 1997 04 01 08 12 63 4.7 -9 671.40 -61.8 -59.8 -61.9 58 -99 SPO 1997 04 01 08 13 64 4.6 -9 671.40 -61.8 -59.8 -61.8 59 -99 SPO 1997 04 01 08 14 64 4.7 -9 671.40 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 15 64 4.8 -9 671.40 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 16 64 5.0 -9 671.30 -61.7 -59.8 -61.8 60 -99 SPO 1997 04 01 08 17 62 5.2 -9 671.30 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 18 61 5.5 -9 671.30 -61.7 -59.8 -61.8 60 -99 SPO 1997 04 01 08 19 60 5.6 -9 671.30 -61.7 -59.7 -61.8 60 -99 SPO 1997 04 01 08 20 59 5.5 -9 671.30 -61.7 -59.7 -61.8 59 -99 SPO 1997 04 01 08 21 60 5.6 -9 671.30 -61.7 -59.7 -61.8 59 -99 SPO 1997 04 01 08 22 61 5.4 -9 671.30 -61.6 -59.7 -61.8 58 -99 SPO 1997 04 01 08 23 62 5.3 -9 671.30 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 08 24 62 5.3 -9 671.30 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 08 25 61 5.3 -9 671.30 -61.6 -59.7 -61.7 59 -99 SPO 1997 04 01 08 26 60 5.4 -9 671.30 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 08 27 57 5.6 -9 671.30 -61.6 -59.8 -61.7 60 -99 SPO 1997 04 01 08 28 55 5.8 -9 671.30 -61.6 -59.8 -61.7 60 -99 SPO 1997 04 01 08 29 54 6.0 -9 671.30 -61.6 -59.7 -61.7 60 -99 SPO 1997 04 01 08 30 53 6.1 -9 671.20 -61.6 -59.7 -61.7 61 -99 SPO 1997 04 01 08 31 53 6.0 -9 671.20 -61.6 -59.7 -61.7 61 -99 SPO 1997 04 01 08 32 53 5.8 -9 671.20 -61.6 -59.7 -61.7 60 -99 SPO 1997 04 01 08 33 53 5.9 -9 671.30 -61.6 -59.6 -61.7 60 -99 SPO 1997 04 01 08 34 52 6.0 -9 671.20 -61.6 -59.6 -61.7 60 -99 SPO 1997 04 01 08 35 51 6.1 -9 671.20 -61.5 -59.6 -61.7 59 -99 SPO 1997 04 01 08 36 50 6.4 -9 671.20 -61.6 -59.6 -61.6 60 -99 SPO 1997 04 01 08 37 49 6.6 -9 671.10 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 08 38 48 6.7 -9 671.20 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 08 39 47 6.6 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 40 47 6.5 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 41 49 6.4 -9 671.30 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 08 42 51 6.2 -9 671.30 -61.5 -59.5 -61.5 61 -99 SPO 1997 04 01 08 43 53 6.0 -9 671.30 -61.5 -59.5 -61.5 61 -99 SPO 1997 04 01 08 44 54 5.8 -9 671.30 -61.4 -59.6 -61.5 59 -99 SPO 1997 04 01 08 45 54 5.9 -9 671.30 -61.4 -59.6 -61.5 59 -99 SPO 1997 04 01 08 46 53 6.0 -9 671.20 -61.4 -59.6 -61.6 59 -99 SPO 1997 04 01 08 47 53 6.3 -9 671.30 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 08 48 51 6.4 -9 671.20 -61.5 -59.5 -61.6 61 -99 SPO 1997 04 01 08 49 49 6.6 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 50 47 7.0 -9 671.20 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 08 51 46 6.9 -9 671.20 -61.4 -59.3 -61.5 61 -99 SPO 1997 04 01 08 52 46 6.9 -9 671.20 -61.4 -59.2 -61.4 61 -99 SPO 1997 04 01 08 53 46 6.7 -9 671.30 -61.4 -59.2 -61.4 62 -99 SPO 1997 04 01 08 54 47 6.8 -9 671.30 -61.3 -59.2 -61.4 61 -99 SPO 1997 04 01 08 55 48 6.7 -9 671.30 -61.3 -59.2 -61.4 60 -99 SPO 1997 04 01 08 56 48 6.8 -9 671.20 -61.3 -59.3 -61.4 60 -99 SPO 1997 04 01 08 57 48 6.8 -9 671.20 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 08 58 48 6.7 -9 671.20 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 08 59 48 6.7 -9 671.30 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 09 00 48 6.5 -9 671.30 -61.4 -59.4 -61.5 61 0 SPO 1997 04 01 09 01 49 6.2 -9 671.30 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 09 02 50 6.0 -9 671.40 -61.4 -59.4 -61.6 61 -99 SPO 1997 04 01 09 03 51 6.0 -9 671.40 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 09 04 52 6.0 -9 671.40 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 09 05 53 6.0 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 06 52 6.1 -9 671.40 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 09 07 52 6.2 -9 671.40 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 09 08 51 6.4 -9 671.40 -61.4 -59.4 -61.5 58 -99 SPO 1997 04 01 09 09 51 6.4 -9 671.40 -61.4 -59.4 -61.5 58 -99 SPO 1997 04 01 09 10 50 6.5 -9 671.40 -61.5 -59.4 -61.6 59 -99 SPO 1997 04 01 09 11 51 6.5 -9 671.40 -61.4 -59.3 -61.5 59 -99 SPO 1997 04 01 09 12 51 6.5 -9 671.40 -61.4 -59.4 -61.5 60 -99 SPO 1997 04 01 09 13 52 6.4 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 14 52 6.4 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 15 52 6.3 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 16 53 6.2 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 17 52 6.1 -9 671.40 -61.5 -59.5 -61.6 61 -99 SPO 1997 04 01 09 18 52 6.1 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 19 52 6.0 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 20 53 6.0 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 21 55 5.8 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 22 56 5.9 -9 671.50 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 23 57 6.0 -9 671.40 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 24 58 5.9 -9 671.40 -61.4 -59.5 -61.5 59 -99 SPO 1997 04 01 09 25 58 6.0 -9 671.40 -61.4 -59.5 -61.6 59 -99 SPO 1997 04 01 09 26 59 5.9 -9 671.40 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 09 27 59 5.8 -9 671.40 -61.5 -59.6 -61.6 59 -99 SPO 1997 04 01 09 28 59 5.6 -9 671.50 -61.5 -59.7 -61.6 58 -99 SPO 1997 04 01 09 29 60 5.6 -9 671.50 -61.6 -59.7 -61.6 59 -99 SPO 1997 04 01 09 30 61 5.3 -9 671.50 -61.6 -59.8 -61.7 58 -99 SPO 1997 04 01 09 31 62 5.3 -9 671.50 -61.6 -59.9 -61.7 58 -99 SPO 1997 04 01 09 32 62 5.4 -9 671.50 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 33 61 5.5 -9 671.50 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 34 60 5.6 -9 671.40 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 35 59 5.8 -9 671.40 -61.6 -59.9 -61.7 60 -99 SPO 1997 04 01 09 36 58 5.9 -9 671.40 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 37 58 6.0 -9 671.40 -61.7 -59.8 -61.7 60 -99 SPO 1997 04 01 09 38 58 6.0 -9 671.40 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 39 58 5.9 -9 671.50 -61.6 -59.7 -61.7 59 -99 SPO 1997 04 01 09 40 58 5.6 -9 671.50 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 41 59 5.6 -9 671.50 -61.6 -59.8 -61.8 58 -99 SPO 1997 04 01 09 42 59 5.5 -9 671.50 -61.7 -59.8 -61.8 58 -99 SPO 1997 04 01 09 43 60 5.5 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 44 59 5.6 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 45 58 5.5 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 46 58 5.5 -9 671.50 -61.8 -59.9 -61.8 59 -99 SPO 1997 04 01 09 47 57 5.5 -9 671.50 -61.8 -60.0 -61.8 60 -99 SPO 1997 04 01 09 48 57 5.5 -9 671.50 -61.8 -60.0 -61.8 60 -99 SPO 1997 04 01 09 49 57 5.5 -9 671.50 -61.8 -60.0 -61.8 61 -99 SPO 1997 04 01 09 50 57 5.5 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 09 51 57 5.5 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 09 52 57 5.4 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 53 57 5.5 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 54 56 5.6 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 55 56 5.6 -9 671.50 -61.8 -60.1 -61.9 58 -99 SPO 1997 04 01 09 56 55 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 57 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 58 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 59 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 00 54 5.8 -9 671.50 -61.9 -60.1 -62.0 61 0 SPO 1997 04 01 10 01 55 5.7 -9 671.50 -61.9 -60.1 -62.0 61 -99 SPO 1997 04 01 10 02 55 5.8 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 03 57 5.7 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 04 58 5.7 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 05 58 5.7 -9 671.50 -61.9 -60.2 -62.0 59 -99 SPO 1997 04 01 10 06 58 5.6 -9 671.50 -62.0 -60.2 -62.0 60 -99 SPO 1997 04 01 10 07 58 5.6 -9 671.50 -62.0 -60.2 -62.1 60 -99 SPO 1997 04 01 10 08 57 5.6 -9 671.50 -61.9 -60.1 -62.1 59 -99 SPO 1997 04 01 10 09 55 5.8 -9 671.50 -61.9 -60.1 -62.0 59 -99 SPO 1997 04 01 10 10 54 6.1 -9 671.50 -62.0 -60.0 -62.0 61 -99 SPO 1997 04 01 10 11 53 6.1 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 12 53 6.1 -9 671.50 -62.0 -60.0 -62.0 61 -99 SPO 1997 04 01 10 13 53 6.1 -9 671.50 -61.9 -60.0 -62.0 59 -99 SPO 1997 04 01 10 14 53 6.0 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 15 54 5.9 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 16 56 5.8 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 17 56 5.8 -9 671.50 -62.0 -60.2 -62.0 59 -99 SPO 1997 04 01 10 18 57 5.8 -9 671.50 -62.0 -60.2 -62.0 59 -99 SPO 1997 04 01 10 19 56 5.7 -9 671.50 -62.0 -60.2 -62.0 60 -99 SPO 1997 04 01 10 20 55 5.8 -9 671.50 -61.9 -60.1 -62.0 60 -99 SPO 1997 04 01 10 21 54 5.8 -9 671.50 -62.0 -60.1 -62.0 61 -99 SPO 1997 04 01 10 22 53 6.1 -9 671.50 -62.0 -60.1 -62.0 61 -99 SPO 1997 04 01 10 23 53 6.3 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 24 54 6.5 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 25 54 6.6 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 26 54 6.8 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 27 53 6.9 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 28 53 6.9 -9 671.50 -61.8 -60.0 -61.9 58 -99 SPO 1997 04 01 10 29 52 6.9 -9 671.50 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 10 30 51 6.8 -9 671.50 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 10 31 51 6.8 -9 671.50 -61.9 -60.0 -61.9 60 -99 SPO 1997 04 01 10 32 52 6.7 -9 671.50 -61.8 -60.0 -61.9 60 -99 SPO 1997 04 01 10 33 53 6.5 -9 671.50 -61.8 -60.0 -61.9 61 -99 SPO 1997 04 01 10 34 54 6.5 -9 671.50 -61.8 -60.1 -61.9 61 -99 SPO 1997 04 01 10 35 55 6.4 -9 671.50 -61.8 -60.1 -61.9 61 -99 SPO 1997 04 01 10 36 55 6.3 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 10 37 55 6.2 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 10 38 54 6.2 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 39 53 6.3 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 40 53 6.2 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 41 52 6.1 -9 671.60 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 42 53 6.1 -9 671.60 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 43 53 5.8 -9 671.60 -61.7 -60.2 -61.8 58 -99 SPO 1997 04 01 10 44 55 5.6 -9 671.60 -61.8 -60.2 -61.8 60 -99 SPO 1997 04 01 10 45 56 5.5 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 46 56 5.4 -9 671.60 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 10 47 56 5.4 -9 671.60 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 48 54 5.4 -9 671.60 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 49 53 5.6 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 50 53 5.6 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 51 53 5.6 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 52 54 5.7 -9 671.70 -61.8 -60.2 -61.9 60 -99 SPO 1997 04 01 10 53 55 5.6 -9 671.70 -61.8 -60.2 -61.9 59 -99 SPO 1997 04 01 10 54 59 5.3 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 55 61 5.2 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 56 62 5.0 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 57 61 5.0 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 58 61 4.9 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 10 59 60 5.1 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 00 59 5.0 -9 671.70 -61.8 -60.4 -61.9 59 0 SPO 1997 04 01 11 01 59 4.9 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 02 59 4.9 -9 671.70 -61.8 -60.4 -61.9 58 -99 SPO 1997 04 01 11 03 60 5.0 -9 671.70 -61.8 -60.4 -61.9 58 -99 SPO 1997 04 01 11 04 61 5.0 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 05 61 5.0 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 11 06 61 5.0 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 11 07 60 5.1 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 11 08 59 5.2 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 11 09 58 5.1 -9 671.60 -61.8 -60.3 -61.9 61 -99 SPO 1997 04 01 11 10 57 5.0 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 11 11 57 4.8 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 11 12 58 4.7 -9 671.70 -61.8 -60.3 -61.8 60 -99 SPO 1997 04 01 11 13 60 4.7 -9 671.70 -61.8 -60.3 -61.8 59 -99 SPO 1997 04 01 11 14 60 4.7 -9 671.70 -61.7 -60.4 -61.8 58 -99 SPO 1997 04 01 11 15 61 4.6 -9 671.70 -61.8 -60.4 -61.8 59 -99 SPO 1997 04 01 11 16 61 4.8 -9 671.70 -61.8 -60.5 -61.8 60 -99 SPO 1997 04 01 11 17 60 4.7 -9 671.70 -61.8 -60.5 -61.8 60 -99 SPO 1997 04 01 11 18 60 4.8 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 19 60 4.6 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 20 60 4.5 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 21 59 4.6 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 22 58 4.5 -9 671.80 -61.8 -60.4 -61.8 61 -99 SPO 1997 04 01 11 23 58 4.3 -9 671.80 -61.7 -60.4 -61.8 59 -99 SPO 1997 04 01 11 24 59 4.3 -9 671.80 -61.7 -60.3 -61.8 59 -99 SPO 1997 04 01 11 25 57 4.3 -9 671.80 -61.6 -60.3 -61.7 59 -99 SPO 1997 04 01 11 26 58 4.4 -9 671.80 -61.6 -60.3 -61.7 59 -99 SPO 1997 04 01 11 27 57 4.5 -9 671.80 -61.6 -60.3 -61.7 60 -99 SPO 1997 04 01 11 28 57 4.7 -9 671.70 -61.6 -60.2 -61.7 61 -99 SPO 1997 04 01 11 29 56 4.7 -9 671.70 -61.5 -60.2 -61.6 61 -99 SPO 1997 04 01 11 30 56 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 31 56 4.9 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 32 57 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 33 56 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 34 56 4.8 -9 671.70 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 35 56 4.8 -9 671.80 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 36 56 4.8 -9 671.80 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 37 56 4.7 -9 671.80 -61.3 -60.2 -61.4 59 -99 SPO 1997 04 01 11 38 57 4.7 -9 671.80 -61.3 -60.2 -61.4 59 -99 SPO 1997 04 01 11 39 59 4.4 -9 671.80 -61.2 -60.2 -61.4 59 -99 SPO 1997 04 01 11 40 59 4.2 -9 671.80 -61.2 -60.2 -61.3 60 -99 SPO 1997 04 01 11 41 59 4.3 -9 671.80 -61.2 -60.2 -61.3 60 -99 SPO 1997 04 01 11 42 58 4.2 -9 671.80 -61.2 -60.3 -61.3 61 -99 SPO 1997 04 01 11 43 57 4.4 -9 671.80 -61.1 -60.3 -61.2 60 -99 SPO 1997 04 01 11 44 56 4.5 -9 671.80 -61.1 -60.2 -61.2 60 -99 SPO 1997 04 01 11 45 55 4.4 -9 671.80 -61.0 -60.2 -61.2 59 -99 SPO 1997 04 01 11 46 55 4.6 -9 671.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 11 47 55 4.6 -9 671.80 -61.0 -60.3 -61.1 61 -99 SPO 1997 04 01 11 48 56 4.7 -9 671.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 11 49 56 4.7 -9 671.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 11 50 55 4.7 -9 671.70 -60.8 -60.3 -60.9 60 -99 SPO 1997 04 01 11 51 54 4.6 -9 671.70 -60.8 -60.2 -60.9 61 -99 SPO 1997 04 01 11 52 53 4.6 -9 671.70 -60.8 -60.2 -60.9 62 -99 SPO 1997 04 01 11 53 52 4.9 -9 671.70 -60.7 -60.1 -60.8 61 -99 SPO 1997 04 01 11 54 52 4.9 -9 671.70 -60.6 -60.1 -60.8 61 -99 SPO 1997 04 01 11 55 51 4.8 -9 671.70 -60.6 -60.1 -60.7 62 -99 SPO 1997 04 01 11 56 51 5.0 -9 671.70 -60.5 -60.0 -60.6 61 -99 SPO 1997 04 01 11 57 49 5.1 -9 671.80 -60.5 -59.9 -60.6 61 -99 SPO 1997 04 01 11 58 50 5.3 -9 671.70 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 11 59 49 5.4 -9 671.70 -60.3 -59.9 -60.4 60 -99 SPO 1997 04 01 12 00 47 5.5 -9 671.70 -60.3 -59.9 -60.4 60 0 SPO 1997 04 01 12 01 46 5.5 -9 671.70 -60.2 -59.9 -60.3 60 -99 SPO 1997 04 01 12 02 45 5.8 -9 671.70 -60.2 -60.0 -60.3 60 -99 SPO 1997 04 01 12 03 46 5.8 -9 671.70 -60.2 -59.9 -60.3 62 -99 SPO 1997 04 01 12 04 44 5.8 -9 671.70 -60.2 -59.8 -60.3 62 -99 SPO 1997 04 01 12 05 44 5.6 -9 671.70 -60.1 -59.8 -60.2 62 -99 SPO 1997 04 01 12 06 44 5.7 -9 671.70 -60.1 -59.8 -60.2 63 -99 SPO 1997 04 01 12 07 44 5.8 -9 671.70 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 01 12 08 44 5.5 -9 671.80 -60.0 -59.7 -60.1 62 -99 SPO 1997 04 01 12 09 44 5.5 -9 671.80 -59.9 -59.7 -60.1 61 -99 SPO 1997 04 01 12 10 44 5.5 -9 671.80 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 01 12 11 45 5.7 -9 671.80 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 01 12 12 45 5.7 -9 671.80 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 01 12 13 45 5.6 -9 671.80 -59.8 -59.6 -60.0 60 -99 SPO 1997 04 01 12 14 44 5.9 -9 671.70 -59.8 -59.6 -59.9 61 -99 SPO 1997 04 01 12 15 45 5.8 -9 671.70 -59.8 -59.6 -59.9 61 -99 SPO 1997 04 01 12 16 44 5.8 -9 671.70 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 17 44 5.8 -9 671.80 -59.8 -59.7 -59.9 63 -99 SPO 1997 04 01 12 18 43 6.0 -9 671.80 -59.8 -59.6 -59.9 63 -99 SPO 1997 04 01 12 19 43 5.7 -9 671.80 -59.8 -59.6 -59.9 63 -99 SPO 1997 04 01 12 20 43 5.8 -9 671.80 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 21 43 5.8 -9 671.80 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 22 43 5.7 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 23 44 5.5 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 24 43 5.8 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 25 42 5.5 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 26 42 5.7 -9 671.80 -59.7 -59.5 -59.8 60 -99 SPO 1997 04 01 12 27 42 5.6 -9 671.80 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 12 28 41 5.5 -9 671.80 -59.7 -59.5 -59.8 62 -99 SPO 1997 04 01 12 29 42 5.6 -9 671.80 -59.7 -59.5 -59.8 62 -99 SPO 1997 04 01 12 30 42 5.6 -9 671.80 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 12 31 42 5.4 -9 671.80 -59.6 -59.5 -59.8 60 -99 SPO 1997 04 01 12 32 42 5.6 -9 671.80 -59.6 -59.5 -59.8 60 -99 SPO 1997 04 01 12 33 42 5.5 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 34 42 5.4 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 35 43 5.6 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 36 44 5.5 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 37 44 5.5 -9 671.80 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 38 45 5.6 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 39 45 5.6 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 40 43 5.5 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 41 43 5.4 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 42 43 5.5 -9 671.90 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 12 43 43 5.5 -9 671.90 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 12 44 43 5.5 -9 671.90 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 12 45 43 5.5 -9 671.90 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 12 46 43 5.2 -9 671.90 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 12 47 44 5.3 -9 671.90 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 48 43 5.1 -9 671.90 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 49 44 5.1 -9 672.00 -59.6 -59.6 -59.7 61 -99 SPO 1997 04 01 12 50 45 5.0 -9 672.00 -59.6 -59.6 -59.7 61 -99 SPO 1997 04 01 12 51 46 5.0 -9 672.00 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 52 44 5.1 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 53 44 5.2 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 54 42 5.4 -9 671.90 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 12 55 43 5.5 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 56 43 5.3 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 57 43 5.3 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 58 42 5.3 -9 671.90 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 12 59 42 5.3 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 13 00 43 5.3 -9 672.00 -59.5 -59.3 -59.6 62 0 SPO 1997 04 01 13 01 42 5.4 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 13 02 43 5.5 -9 672.00 -59.5 -59.3 -59.5 61 -99 SPO 1997 04 01 13 03 44 5.5 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 04 43 5.5 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 05 44 5.7 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 06 44 5.4 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 07 44 5.7 -9 671.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 01 13 08 45 5.5 -9 671.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 01 13 09 44 5.9 -9 671.90 -59.4 -59.2 -59.5 60 -99 SPO 1997 04 01 13 10 43 6.0 -9 671.90 -59.4 -59.2 -59.4 60 -99 SPO 1997 04 01 13 11 43 5.9 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 12 43 6.0 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 13 42 5.8 -9 671.90 -59.4 -59.2 -59.4 62 -99 SPO 1997 04 01 13 14 42 6.1 -9 671.90 -59.4 -59.2 -59.4 62 -99 SPO 1997 04 01 13 15 43 5.9 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 16 42 6.0 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 17 42 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 18 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 19 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 20 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 21 42 6.1 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 22 43 5.9 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 23 42 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 24 43 6.1 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 25 42 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 26 42 6.0 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 27 42 5.7 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 28 42 5.8 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 29 41 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 30 41 6.0 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 31 41 5.9 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 32 41 5.9 -9 671.90 -59.3 -59.1 -59.4 60 -99 SPO 1997 04 01 13 33 41 5.7 -9 671.90 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 34 41 5.8 -9 671.90 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 35 41 5.7 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 36 41 5.5 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 37 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 38 43 5.4 -9 672.00 -59.3 -59.3 -59.4 61 -99 SPO 1997 04 01 13 39 43 5.1 -9 672.00 -59.3 -59.3 -59.4 61 -99 SPO 1997 04 01 13 40 44 5.2 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 41 43 5.3 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 42 43 5.3 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 43 43 5.3 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 44 41 5.5 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 45 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 46 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 47 43 5.5 -9 672.00 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 48 43 5.5 -9 672.00 -59.4 -59.2 -59.5 61 -99 SPO 1997 04 01 13 49 43 5.3 -9 672.00 -59.4 -59.2 -59.5 61 -99 SPO 1997 04 01 13 50 43 5.4 -9 672.00 -59.4 -59.3 -59.5 62 -99 SPO 1997 04 01 13 51 43 5.3 -9 672.00 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 52 43 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 53 42 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 54 42 5.1 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 55 42 5.1 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 56 41 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 57 43 5.2 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 58 43 5.4 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 59 43 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 14 00 43 5.5 -9 672.00 -59.5 -59.3 -59.6 62 0 SPO 1997 04 01 14 01 43 5.6 -9 672.00 -59.5 -59.3 -59.6 62 -99 SPO 1997 04 01 14 02 43 5.6 -9 672.00 -59.5 -59.3 -59.6 62 -99 SPO 1997 04 01 14 03 42 5.7 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 14 04 42 5.5 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 14 05 43 5.4 -9 672.00 -59.5 -59.3 -59.6 60 -99 SPO 1997 04 01 14 06 42 5.1 -9 672.00 -59.5 -59.4 -59.6 60 -99 SPO 1997 04 01 14 07 42 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 08 42 5.2 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 09 43 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 10 43 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 11 44 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 12 44 5.2 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 13 45 5.2 -9 672.00 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 14 45 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 15 45 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 16 46 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 17 46 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 18 46 5.0 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 19 46 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 20 46 5.5 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 21 46 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 22 45 5.4 -9 672.00 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 23 44 5.4 -9 671.90 -59.7 -59.5 -59.7 61 -99 SPO 1997 04 01 14 24 44 5.4 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 25 43 5.5 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 26 44 5.5 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 27 44 5.5 -9 672.00 -59.7 -59.5 -59.8 60 -99 SPO 1997 04 01 14 28 44 5.4 -9 672.00 -59.7 -59.5 -59.7 60 -99 SPO 1997 04 01 14 29 44 5.2 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 30 44 5.2 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 31 43 5.1 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 32 43 5.0 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 33 44 4.9 -9 672.00 -59.7 -59.4 -59.7 61 -99 SPO 1997 04 01 14 34 43 4.8 -9 672.00 -59.7 -59.4 -59.7 61 -99 SPO 1997 04 01 14 35 43 4.9 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 36 42 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 37 41 4.8 -9 672.10 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 38 40 4.8 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 39 41 4.7 -9 672.10 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 40 41 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 41 41 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 42 41 4.6 -9 672.20 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 43 42 4.6 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 44 42 4.7 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 45 42 4.9 -9 672.20 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 14 46 42 4.7 -9 672.20 -59.6 -59.3 -59.6 62 -99 SPO 1997 04 01 14 47 42 4.6 -9 672.20 -59.6 -59.3 -59.6 62 -99 SPO 1997 04 01 14 48 43 4.6 -9 672.20 -59.6 -59.3 -59.7 62 -99 SPO 1997 04 01 14 49 43 4.9 -9 672.20 -59.6 -59.3 -59.7 62 -99 SPO 1997 04 01 14 50 44 4.9 -9 672.20 -59.6 -59.3 -59.6 61 -99 SPO 1997 04 01 14 51 45 4.7 -9 672.20 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 52 46 4.9 -9 672.20 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 53 46 5.1 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 54 46 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 55 47 5.1 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 56 46 5.3 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 57 46 5.2 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 58 46 5.2 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 59 44 5.5 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 00 45 5.4 -9 672.10 -59.6 -59.3 -59.7 61 0 SPO 1997 04 01 15 01 43 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 02 43 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 03 44 5.6 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 04 43 5.5 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 05 43 5.5 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 06 43 5.7 -9 672.10 -59.6 -59.2 -59.7 61 -99 SPO 1997 04 01 15 07 42 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 08 42 5.8 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 09 42 5.7 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 15 10 41 5.9 -9 672.10 -59.7 -59.3 -59.8 62 -99 SPO 1997 04 01 15 11 41 6.2 -9 672.00 -59.7 -59.3 -59.8 61 -99 SPO 1997 04 01 15 12 40 6.3 -9 672.00 -59.7 -59.3 -59.7 61 -99 SPO 1997 04 01 15 13 41 6.3 -9 672.00 -59.7 -59.3 -59.7 61 -99 SPO 1997 04 01 15 14 41 6.2 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 15 41 6.1 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 16 41 6.3 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 17 40 6.0 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 18 41 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 19 42 5.9 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 20 42 5.9 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 21 42 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 22 42 5.9 -9 672.10 -59.7 -59.2 -59.8 60 -99 SPO 1997 04 01 15 23 41 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 24 40 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 25 40 6.1 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 26 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 27 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 28 41 6.0 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 29 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 30 41 6.0 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 31 42 5.9 -9 672.10 -59.7 -59.3 -59.8 61 -99 SPO 1997 04 01 15 32 42 5.9 -9 672.10 -59.7 -59.4 -59.8 61 -99 SPO 1997 04 01 15 33 42 5.9 -9 672.10 -59.7 -59.4 -59.8 61 -99 SPO 1997 04 01 15 34 42 6.1 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 35 42 6.3 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 36 43 6.4 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 37 43 6.3 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 38 43 6.4 -9 672.00 -59.7 -59.3 -59.9 59 -99 SPO 1997 04 01 15 39 43 6.4 -9 672.00 -59.7 -59.4 -59.9 59 -99 SPO 1997 04 01 15 40 43 6.5 -9 672.00 -59.8 -59.4 -59.9 60 -99 SPO 1997 04 01 15 41 43 6.3 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 42 43 6.3 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 43 43 6.3 -9 672.10 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 44 43 6.2 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 45 42 6.2 -9 672.10 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 46 42 6.2 -9 672.10 -59.8 -59.5 -59.9 59 -99 SPO 1997 04 01 15 47 42 6.0 -9 672.10 -59.8 -59.5 -59.9 59 -99 SPO 1997 04 01 15 48 42 6.2 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 49 42 6.0 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 50 43 6.0 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 51 44 5.8 -9 672.20 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 52 44 5.7 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 53 45 5.8 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 54 45 5.5 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 55 45 5.3 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 56 45 5.2 -9 672.30 -60.0 -59.7 -60.0 60 -99 SPO 1997 04 01 15 57 45 5.3 -9 672.30 -60.0 -59.7 -60.1 60 -99 SPO 1997 04 01 15 58 44 5.3 -9 672.30 -60.0 -59.7 -60.1 60 -99 SPO 1997 04 01 15 59 46 5.2 -9 672.30 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 01 16 00 45 5.4 -9 672.30 -60.0 -59.8 -60.1 59 0 SPO 1997 04 01 16 01 45 5.3 -9 672.30 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 02 46 5.3 -9 672.20 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 03 46 5.3 -9 672.30 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 04 48 5.5 -9 672.30 -60.1 -59.8 -60.2 61 -99 SPO 1997 04 01 16 05 48 5.6 -9 672.20 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 06 48 5.7 -9 672.20 -60.2 -59.8 -60.3 61 -99 SPO 1997 04 01 16 07 47 5.7 -9 672.20 -60.2 -59.8 -60.3 60 -99 SPO 1997 04 01 16 08 47 5.5 -9 672.20 -60.2 -59.8 -60.3 60 -99 SPO 1997 04 01 16 09 46 5.7 -9 672.20 -60.3 -59.8 -60.4 60 -99 SPO 1997 04 01 16 10 46 5.7 -9 672.20 -60.3 -59.8 -60.4 60 -99 SPO 1997 04 01 16 11 46 5.9 -9 672.20 -60.3 -59.9 -60.4 59 -99 SPO 1997 04 01 16 12 45 6.0 -9 672.20 -60.3 -59.9 -60.4 59 -99 SPO 1997 04 01 16 13 46 6.0 -9 672.10 -60.4 -59.9 -60.4 60 -99 SPO 1997 04 01 16 14 45 6.0 -9 672.20 -60.4 -59.9 -60.4 60 -99 SPO 1997 04 01 16 15 45 6.0 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 16 45 5.8 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 17 45 5.9 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 18 46 5.8 -9 672.20 -60.4 -59.9 -60.6 60 -99 SPO 1997 04 01 16 19 46 5.8 -9 672.20 -60.5 -59.9 -60.6 61 -99 SPO 1997 04 01 16 20 45 5.8 -9 672.20 -60.5 -59.9 -60.6 60 -99 SPO 1997 04 01 16 21 46 5.6 -9 672.20 -60.5 -59.9 -60.6 59 -99 SPO 1997 04 01 16 22 47 5.6 -9 672.20 -60.6 -59.9 -60.6 60 -99 SPO 1997 04 01 16 23 47 5.4 -9 672.30 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 24 48 5.4 -9 672.30 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 25 49 5.3 -9 672.20 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 26 49 5.0 -9 672.30 -60.6 -60.0 -60.7 59 -99 SPO 1997 04 01 16 27 48 5.0 -9 672.30 -60.6 -60.0 -60.7 59 -99 SPO 1997 04 01 16 28 48 5.1 -9 672.30 -60.7 -60.0 -60.8 60 -99 SPO 1997 04 01 16 29 48 5.2 -9 672.30 -60.7 -60.0 -60.7 60 -99 SPO 1997 04 01 16 30 48 5.2 -9 672.30 -60.7 -60.0 -60.8 60 -99 SPO 1997 04 01 16 31 48 5.3 -9 672.30 -60.7 -60.0 -60.8 59 -99 SPO 1997 04 01 16 32 48 5.4 -9 672.30 -60.7 -60.0 -60.8 59 -99 SPO 1997 04 01 16 33 47 5.6 -9 672.30 -60.8 -60.0 -60.8 59 -99 SPO 1997 04 01 16 34 47 5.7 -9 672.20 -60.8 -60.0 -60.8 59 -99 SPO 1997 04 01 16 35 47 5.9 -9 672.20 -60.8 -60.0 -60.9 59 -99 SPO 1997 04 01 16 36 47 5.9 -9 672.20 -60.8 -60.0 -60.9 59 -99 SPO 1997 04 01 16 37 47 6.1 -9 672.20 -60.8 -59.9 -60.9 60 -99 SPO 1997 04 01 16 38 48 5.9 -9 672.20 -60.8 -59.9 -60.9 60 -99 SPO 1997 04 01 16 39 48 5.9 -9 672.30 -60.9 -59.9 -60.9 61 -99 SPO 1997 04 01 16 40 48 5.8 -9 672.30 -60.9 -59.9 -61.0 61 -99 SPO 1997 04 01 16 41 47 5.7 -9 672.30 -60.9 -59.9 -61.0 60 -99 SPO 1997 04 01 16 42 48 5.6 -9 672.30 -60.9 -60.0 -61.0 59 -99 SPO 1997 04 01 16 43 48 5.8 -9 672.20 -60.9 -60.0 -61.0 59 -99 SPO 1997 04 01 16 44 47 6.0 -9 672.20 -61.0 -60.0 -61.0 60 -99 SPO 1997 04 01 16 45 47 6.1 -9 672.20 -61.0 -60.0 -61.0 60 -99 SPO 1997 04 01 16 46 46 6.2 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 47 46 6.3 -9 672.20 -61.0 -60.0 -61.0 59 -99 SPO 1997 04 01 16 48 46 6.3 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 49 47 6.4 -9 672.20 -61.0 -60.0 -61.1 60 -99 SPO 1997 04 01 16 50 47 6.4 -9 672.20 -61.0 -60.0 -61.1 60 -99 SPO 1997 04 01 16 51 48 6.2 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 52 48 6.2 -9 672.20 -61.0 -60.1 -61.1 59 -99 SPO 1997 04 01 16 53 48 6.3 -9 672.20 -61.0 -60.1 -61.1 59 -99 SPO 1997 04 01 16 54 48 6.2 -9 672.20 -61.1 -60.1 -61.1 59 -99 SPO 1997 04 01 16 55 47 6.1 -9 672.20 -61.0 -60.1 -61.2 58 -99 SPO 1997 04 01 16 56 48 6.2 -9 672.20 -61.1 -60.1 -61.2 59 -99 SPO 1997 04 01 16 57 47 6.1 -9 672.20 -61.1 -60.2 -61.2 58 -99 SPO 1997 04 01 16 58 48 6.0 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 16 59 48 5.8 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 17 00 48 5.7 -9 672.20 -61.1 -60.3 -61.2 59 0 SPO 1997 04 01 17 01 48 5.7 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 17 02 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 03 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 04 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 05 48 5.6 -9 672.20 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 17 06 48 5.5 -9 672.30 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 07 49 5.6 -9 672.30 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 08 49 5.5 -9 672.20 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 09 49 5.6 -9 672.30 -61.3 -60.4 -61.4 59 -99 SPO 1997 04 01 17 10 49 5.7 -9 672.30 -61.2 -60.5 -61.4 59 -99 SPO 1997 04 01 17 11 49 5.8 -9 672.30 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 12 49 5.7 -9 672.30 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 13 49 5.6 -9 672.30 -61.4 -60.6 -61.4 -99 -99 SPO 1997 04 01 17 14 49 5.5 -9 672.30 -61.4 -60.6 -61.5 -99 -99 SPO 1997 04 01 17 15 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 17 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 18 -999 -99.9 -9 672.30 -61.5 -60.6 -61.6 -99 -99 SPO 1997 04 01 17 19 49 5.7 -9 672.30 -61.5 -60.6 -61.6 -99 -99 SPO 1997 04 01 17 20 48 5.8 -9 672.20 -61.5 -60.6 -61.6 59 -99 SPO 1997 04 01 17 21 47 5.9 -9 672.20 -61.5 -60.6 -61.6 58 -99 SPO 1997 04 01 17 22 46 6.1 -9 672.20 -61.5 -60.6 -61.6 58 -99 SPO 1997 04 01 17 23 45 6.4 -9 672.20 -61.6 -60.5 -61.6 60 -99 SPO 1997 04 01 17 24 44 6.5 -9 672.20 -61.6 -60.5 -61.6 60 -99 SPO 1997 04 01 17 25 43 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 26 42 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 27 43 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 28 42 6.5 -9 672.20 -61.5 -60.4 -61.5 59 -99 SPO 1997 04 01 17 29 42 6.4 -9 672.20 -61.5 -60.4 -61.5 59 -99 SPO 1997 04 01 17 30 42 6.6 -9 672.20 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 17 31 43 6.4 -9 672.20 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 17 32 44 6.3 -9 672.20 -61.4 -60.5 -61.4 59 -99 SPO 1997 04 01 17 33 45 6.4 -9 672.20 -61.4 -60.5 -61.4 59 -99 SPO 1997 04 01 17 34 45 6.5 -9 672.20 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 35 45 6.6 -9 672.20 -61.3 -60.5 -61.4 60 -99 SPO 1997 04 01 17 36 45 6.6 -9 672.20 -61.2 -60.5 -61.3 60 -99 SPO 1997 04 01 17 37 45 6.7 -9 672.10 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 17 38 45 6.7 -9 672.20 -61.2 -60.4 -61.2 61 -99 SPO 1997 04 01 17 39 44 6.7 -9 672.10 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 17 40 45 6.8 -9 672.10 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 17 41 45 6.8 -9 672.10 -61.1 -60.4 -61.1 60 -99 SPO 1997 04 01 17 42 44 6.9 -9 672.10 -61.1 -60.4 -61.1 60 -99 SPO 1997 04 01 17 43 44 6.9 -9 672.10 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 01 17 44 44 6.5 -9 672.20 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 01 17 45 44 6.5 -9 672.20 -61.0 -60.5 -61.0 59 -99 SPO 1997 04 01 17 46 44 6.1 -9 672.20 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 17 47 45 6.0 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 48 46 5.8 -9 672.30 -60.9 -60.6 -61.0 60 -99 SPO 1997 04 01 17 49 47 5.7 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 50 49 5.5 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 51 49 5.4 -9 672.40 -60.9 -60.5 -61.0 61 -99 SPO 1997 04 01 17 52 50 5.3 -9 672.40 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 53 50 5.0 -9 672.40 -60.8 -60.5 -61.0 60 -99 SPO 1997 04 01 17 54 49 5.4 -9 672.40 -60.8 -60.5 -61.0 59 -99 SPO 1997 04 01 17 55 48 5.1 -9 672.40 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 17 56 48 5.3 -9 672.40 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 17 57 48 5.4 -9 672.40 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 17 58 48 5.4 -9 672.40 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 17 59 47 5.4 -9 672.40 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 18 00 47 5.6 -9 672.50 -60.7 -60.5 -60.8 61 0 SPO 1997 04 01 18 01 47 5.5 -9 672.40 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 02 45 5.5 -9 672.50 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 03 46 5.6 -9 672.50 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 04 45 5.7 -9 672.50 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 01 18 05 45 5.6 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 06 45 5.8 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 07 45 5.9 -9 672.40 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 08 45 6.0 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 09 45 6.0 -9 672.50 -60.7 -60.4 -60.7 61 -99 SPO 1997 04 01 18 10 46 5.6 -9 672.50 -60.6 -60.3 -60.8 60 -99 SPO 1997 04 01 18 11 47 5.7 -9 672.50 -60.6 -60.3 -60.7 60 -99 SPO 1997 04 01 18 12 47 5.7 -9 672.60 -60.6 -60.3 -60.7 61 -99 SPO 1997 04 01 18 13 49 5.5 -9 672.60 -60.6 -60.3 -60.7 60 -99 SPO 1997 04 01 18 14 50 5.4 -9 672.60 -60.6 -60.4 -60.7 60 -99 SPO 1997 04 01 18 15 49 5.5 -9 672.60 -60.6 -60.4 -60.8 59 -99 SPO 1997 04 01 18 16 50 5.6 -9 672.60 -60.6 -60.4 -60.8 59 -99 SPO 1997 04 01 18 17 50 5.8 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 18 51 5.7 -9 672.60 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 19 50 5.6 -9 672.60 -60.7 -60.5 -60.8 59 -99 SPO 1997 04 01 18 20 51 5.5 -9 672.60 -60.7 -60.5 -60.8 59 -99 SPO 1997 04 01 18 21 51 5.3 -9 672.60 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 22 52 5.5 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 23 52 5.4 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 24 51 5.6 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 25 50 5.7 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 26 50 5.7 -9 672.60 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 18 27 49 5.6 -9 672.60 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 18 28 49 6.1 -9 672.60 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 18 29 48 6.0 -9 672.60 -60.8 -60.4 -60.8 59 -99 SPO 1997 04 01 18 30 48 5.7 -9 672.60 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 18 31 47 5.5 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 32 47 5.8 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 33 47 5.7 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 34 46 5.6 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 35 46 5.7 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 36 46 5.8 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 37 45 6.0 -9 672.60 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 38 45 6.0 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 39 46 5.9 -9 672.60 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 18 40 45 6.1 -9 672.60 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 18 41 45 6.1 -9 672.60 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 42 45 6.3 -9 672.60 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 43 44 6.2 -9 672.60 -60.9 -60.4 -61.0 60 -99 SPO 1997 04 01 18 44 44 6.1 -9 672.60 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 45 44 6.0 -9 672.60 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 46 43 5.8 -9 672.70 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 47 44 5.6 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 48 44 5.3 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 49 45 5.5 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 50 45 5.5 -9 672.70 -60.9 -60.5 -60.9 60 -99 SPO 1997 04 01 18 51 45 5.5 -9 672.70 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 52 46 5.5 -9 672.70 -60.9 -60.4 -60.9 59 -99 SPO 1997 04 01 18 53 45 5.5 -9 672.80 -60.9 -60.4 -60.9 59 -99 SPO 1997 04 01 18 54 45 5.5 -9 672.80 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 18 55 46 5.5 -9 672.80 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 56 46 5.5 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 57 46 5.6 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 58 47 5.8 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 59 47 6.0 -9 672.80 -60.9 -60.3 -60.9 61 -99 SPO 1997 04 01 19 00 46 6.2 -9 672.70 -60.9 -60.3 -60.9 61 0 SPO 1997 04 01 19 01 46 6.3 -9 672.70 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 19 02 47 6.3 -9 672.70 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 19 03 47 6.3 -9 672.70 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 04 46 6.1 -9 672.70 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 05 46 6.2 -9 672.80 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 06 47 6.0 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 07 47 5.8 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 08 48 5.8 -9 672.80 -60.9 -60.4 -61.0 61 -99 SPO 1997 04 01 19 09 48 5.7 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 10 49 5.8 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 11 50 5.8 -9 672.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 12 50 5.8 -9 672.80 -61.0 -60.3 -61.0 60 -99 SPO 1997 04 01 19 13 50 5.8 -9 672.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 14 51 5.6 -9 672.90 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 15 52 5.5 -9 672.90 -61.0 -60.2 -61.1 59 -99 SPO 1997 04 01 19 16 52 5.4 -9 672.90 -61.0 -60.3 -61.1 59 -99 SPO 1997 04 01 19 17 53 5.3 -9 672.90 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 18 53 5.4 -9 672.90 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 19 19 53 5.4 -9 672.90 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 19 20 53 5.4 -9 672.90 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 19 21 53 5.4 -9 672.90 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 19 22 53 5.4 -9 672.90 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 19 23 52 5.4 -9 672.90 -61.2 -60.3 -61.3 60 -99 SPO 1997 04 01 19 24 52 5.3 -9 672.90 -61.2 -60.3 -61.3 59 -99 SPO 1997 04 01 19 25 53 5.3 -9 672.80 -61.2 -60.3 -61.3 59 -99 SPO 1997 04 01 19 26 53 5.3 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 27 53 5.3 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 28 52 5.2 -9 672.90 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 29 51 5.1 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 30 50 5.1 -9 672.90 -61.4 -60.4 -61.4 59 -99 SPO 1997 04 01 19 31 50 5.1 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 32 50 5.0 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 33 50 5.0 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 34 50 4.7 -9 672.90 -61.4 -60.4 -61.5 59 -99 SPO 1997 04 01 19 35 51 4.5 -9 672.90 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 19 36 51 4.4 -9 672.90 -61.4 -60.5 -61.5 62 -99 SPO 1997 04 01 19 37 51 4.3 -9 672.90 -61.4 -60.5 -61.5 65 -99 SPO 1997 04 01 19 38 50 4.5 -9 672.90 -61.4 -60.5 -61.5 65 -99 SPO 1997 04 01 19 39 50 4.8 -9 672.90 -61.4 -60.4 -61.5 65 -99 SPO 1997 04 01 19 40 50 5.0 -9 672.90 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 41 49 5.1 -9 672.90 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 42 48 5.1 -9 672.90 -61.4 -60.3 -61.5 65 -99 SPO 1997 04 01 19 43 48 4.8 -9 672.90 -61.4 -60.3 -61.6 65 -99 SPO 1997 04 01 19 44 49 4.7 -9 673.00 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 45 50 4.6 -9 673.00 -61.4 -60.4 -61.6 63 -99 SPO 1997 04 01 19 46 51 4.7 -9 673.00 -61.5 -60.4 -61.6 63 -99 SPO 1997 04 01 19 47 51 4.9 -9 672.90 -61.5 -60.5 -61.6 63 -99 SPO 1997 04 01 19 48 51 5.2 -9 672.90 -61.5 -60.5 -61.6 62 -99 SPO 1997 04 01 19 49 50 5.4 -9 672.90 -61.5 -60.4 -61.6 62 -99 SPO 1997 04 01 19 50 49 5.6 -9 672.90 -61.5 -60.4 -61.6 62 -99 SPO 1997 04 01 19 51 49 5.5 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 52 49 5.5 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 53 49 5.4 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 54 51 5.5 -9 672.90 -61.6 -60.3 -61.6 62 -99 SPO 1997 04 01 19 55 51 5.4 -9 672.90 -61.6 -60.3 -61.7 63 -99 SPO 1997 04 01 19 56 51 5.5 -9 672.90 -61.6 -60.3 -61.7 62 -99 SPO 1997 04 01 19 57 51 5.7 -9 672.90 -61.5 -60.3 -61.7 62 -99 SPO 1997 04 01 19 58 51 5.8 -9 672.90 -61.6 -60.2 -61.7 62 -99 SPO 1997 04 01 19 59 50 5.7 -9 672.90 -61.6 -60.2 -61.7 62 -99 SPO 1997 04 01 20 00 50 5.7 -9 672.90 -61.6 -60.3 -61.7 61 0 SPO 1997 04 01 20 01 50 5.8 -9 672.90 -61.6 -60.3 -61.7 60 -99 SPO 1997 04 01 20 02 50 5.9 -9 672.90 -61.6 -60.3 -61.7 61 -99 SPO 1997 04 01 20 03 50 5.9 -9 672.80 -61.7 -60.3 -61.8 62 -99 SPO 1997 04 01 20 04 50 6.1 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 05 50 6.1 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 06 50 6.2 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 07 50 6.3 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 08 49 6.3 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 09 49 6.4 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 10 50 6.4 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 11 50 6.3 -9 672.80 -61.7 -60.4 -61.8 60 -99 SPO 1997 04 01 20 12 51 6.1 -9 672.80 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 20 13 52 5.9 -9 672.90 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 20 14 52 5.7 -9 672.80 -61.8 -60.5 -61.9 61 -99 SPO 1997 04 01 20 15 53 5.8 -9 672.90 -61.8 -60.5 -61.9 61 -99 SPO 1997 04 01 20 16 53 5.7 -9 672.90 -61.8 -60.6 -61.9 61 -99 SPO 1997 04 01 20 17 54 5.7 -9 672.80 -61.9 -60.6 -61.9 61 -99 SPO 1997 04 01 20 18 54 5.8 -9 672.80 -61.9 -60.6 -62.0 61 -99 SPO 1997 04 01 20 19 54 5.8 -9 672.80 -61.9 -60.7 -62.0 61 -99 SPO 1997 04 01 20 20 53 5.9 -9 672.80 -62.0 -60.7 -62.0 61 -99 SPO 1997 04 01 20 21 53 6.0 -9 672.80 -62.0 -60.6 -62.1 61 -99 SPO 1997 04 01 20 22 52 6.0 -9 672.80 -62.0 -60.6 -62.1 61 -99 SPO 1997 04 01 20 23 51 6.2 -9 672.80 -62.0 -60.6 -62.1 60 -99 SPO 1997 04 01 20 24 51 6.2 -9 672.70 -62.0 -60.6 -62.1 60 -99 SPO 1997 04 01 20 25 51 6.4 -9 672.70 -62.0 -60.5 -62.1 61 -99 SPO 1997 04 01 20 26 51 6.4 -9 672.70 -62.0 -60.5 -62.1 61 -99 SPO 1997 04 01 20 27 51 6.3 -9 672.70 -62.0 -60.5 -62.2 61 -99 SPO 1997 04 01 20 28 52 6.3 -9 672.70 -62.0 -60.5 -62.2 61 -99 SPO 1997 04 01 20 29 52 6.3 -9 672.70 -62.1 -60.5 -62.2 61 -99 SPO 1997 04 01 20 30 52 6.3 -9 672.70 -62.1 -60.5 -62.2 61 -99 SPO 1997 04 01 20 31 51 6.3 -9 672.70 -62.1 -60.6 -62.2 60 -99 SPO 1997 04 01 20 32 51 6.2 -9 672.70 -62.2 -60.6 -62.2 60 -99 SPO 1997 04 01 20 33 51 6.2 -9 672.70 -62.2 -60.6 -62.2 60 -99 SPO 1997 04 01 20 34 51 6.1 -9 672.70 -62.2 -60.6 -62.3 60 -99 SPO 1997 04 01 20 35 51 6.2 -9 672.70 -62.2 -60.6 -62.3 60 -99 SPO 1997 04 01 20 36 51 6.0 -9 672.70 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 37 51 5.9 -9 672.70 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 38 51 6.1 -9 672.70 -62.3 -60.7 -62.3 61 -99 SPO 1997 04 01 20 39 51 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 40 50 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 41 50 6.3 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 42 49 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 43 49 6.3 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 44 48 6.3 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 45 48 6.1 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 46 49 5.9 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 47 49 5.8 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 20 48 50 5.8 -9 672.70 -62.3 -60.8 -62.3 61 -99 SPO 1997 04 01 20 49 50 5.6 -9 672.70 -62.3 -60.9 -62.3 61 -99 SPO 1997 04 01 20 50 50 5.6 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 51 50 5.7 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 52 50 5.9 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 53 49 5.8 -9 672.70 -62.3 -60.9 -62.3 62 -99 SPO 1997 04 01 20 54 49 5.9 -9 672.70 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 20 55 48 5.9 -9 672.70 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 20 56 48 6.1 -9 672.70 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 20 57 48 6.0 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 20 58 47 5.9 -9 672.70 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 20 59 46 5.9 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 00 47 6.0 -9 672.80 -62.2 -60.8 -62.3 60 0 SPO 1997 04 01 21 01 46 5.7 -9 672.80 -62.1 -60.8 -62.2 59 -99 SPO 1997 04 01 21 02 46 5.8 -9 672.80 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 21 03 45 5.8 -9 672.80 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 21 04 46 5.7 -9 672.80 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 21 05 45 5.8 -9 672.80 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 06 46 5.8 -9 672.90 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 07 44 5.6 -9 672.90 -62.2 -60.8 -62.2 60 -99 SPO 1997 04 01 21 08 45 5.4 -9 672.90 -62.2 -60.8 -62.2 60 -99 SPO 1997 04 01 21 09 46 5.3 -9 672.90 -62.1 -60.8 -62.2 60 -99 SPO 1997 04 01 21 10 46 5.2 -9 672.90 -62.0 -60.8 -62.2 59 -99 SPO 1997 04 01 21 11 47 5.0 -9 673.00 -62.0 -60.8 -62.2 60 -99 SPO 1997 04 01 21 12 48 4.6 -9 673.00 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 13 49 4.6 -9 673.00 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 14 49 4.4 -9 673.10 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 15 49 4.3 -9 673.10 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 16 49 4.5 -9 673.10 -62.1 -60.9 -62.2 60 -99 SPO 1997 04 01 21 17 48 4.6 -9 673.10 -62.1 -61.0 -62.2 59 -99 SPO 1997 04 01 21 18 49 4.7 -9 673.10 -62.1 -61.0 -62.2 59 -99 SPO 1997 04 01 21 19 48 4.8 -9 673.10 -62.2 -61.0 -62.2 58 -99 SPO 1997 04 01 21 20 48 4.9 -9 673.10 -62.2 -61.0 -62.2 60 -99 SPO 1997 04 01 21 21 48 5.0 -9 673.10 -62.1 -60.9 -62.2 59 -99 SPO 1997 04 01 21 22 49 5.1 -9 673.10 -62.1 -60.9 -62.2 60 -99 SPO 1997 04 01 21 23 48 5.2 -9 673.10 -62.2 -60.8 -62.2 61 -99 SPO 1997 04 01 21 24 48 5.3 -9 673.10 -62.2 -60.8 -62.2 61 -99 SPO 1997 04 01 21 25 48 5.3 -9 673.10 -62.1 -60.8 -62.2 60 -99 SPO 1997 04 01 21 26 49 5.3 -9 673.10 -62.1 -60.8 -62.3 60 -99 SPO 1997 04 01 21 27 49 5.4 -9 673.10 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 28 50 5.5 -9 673.10 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 21 29 49 5.6 -9 673.10 -62.2 -60.8 -62.4 58 -99 SPO 1997 04 01 21 30 49 5.7 -9 673.10 -62.2 -60.7 -62.4 57 -99 SPO 1997 04 01 21 31 48 5.8 -9 673.10 -62.2 -60.8 -62.3 57 -99 SPO 1997 04 01 21 32 48 5.8 -9 673.00 -62.2 -60.8 -62.4 57 -99 SPO 1997 04 01 21 33 48 5.9 -9 673.00 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 34 47 6.0 -9 673.00 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 35 47 5.9 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 36 47 5.8 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 37 47 5.9 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 38 48 5.7 -9 673.10 -62.3 -60.7 -62.4 59 -99 SPO 1997 04 01 21 39 49 5.5 -9 673.10 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 40 50 5.3 -9 673.10 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 41 51 5.2 -9 673.10 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 42 52 4.9 -9 673.20 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 43 54 4.6 -9 673.20 -62.4 -60.8 -62.5 58 -99 SPO 1997 04 01 21 44 55 4.5 -9 673.20 -62.4 -60.9 -62.5 58 -99 SPO 1997 04 01 21 45 55 4.6 -9 673.20 -62.5 -60.9 -62.6 59 -99 SPO 1997 04 01 21 46 54 4.8 -9 673.20 -62.6 -60.9 -62.6 59 -99 SPO 1997 04 01 21 47 54 4.8 -9 673.20 -62.6 -61.0 -62.7 59 -99 SPO 1997 04 01 21 48 55 4.7 -9 673.20 -62.6 -61.0 -62.8 59 -99 SPO 1997 04 01 21 49 55 4.4 -9 673.20 -62.8 -61.1 -62.8 60 -99 SPO 1997 04 01 21 50 56 4.5 -9 673.20 -62.9 -61.1 -62.9 59 -99 SPO 1997 04 01 21 51 57 4.5 -9 673.30 -63.0 -61.1 -63.0 59 -99 SPO 1997 04 01 21 52 57 4.4 -9 673.30 -63.1 -61.1 -63.1 58 -99 SPO 1997 04 01 21 53 57 4.6 -9 673.30 -63.2 -61.1 -63.2 58 -99 SPO 1997 04 01 21 54 55 4.7 -9 673.30 -63.2 -61.0 -63.2 57 -99 SPO 1997 04 01 21 55 55 4.8 -9 673.30 -63.3 -61.0 -63.3 57 -99 SPO 1997 04 01 21 56 54 4.8 -9 673.20 -63.4 -61.0 -63.3 58 -99 SPO 1997 04 01 21 57 54 5.0 -9 673.20 -63.4 -61.0 -63.4 57 -99 SPO 1997 04 01 21 58 54 5.0 -9 673.30 -63.5 -61.0 -63.5 57 -99 SPO 1997 04 01 21 59 55 4.8 -9 673.30 -63.6 -61.0 -63.5 58 -99 SPO 1997 04 01 22 00 56 4.8 -9 673.30 -63.6 -61.0 -63.6 57 0 SPO 1997 04 01 22 01 56 4.7 -9 673.30 -63.7 -61.1 -63.7 56 -99 SPO 1997 04 01 22 02 56 4.7 -9 673.30 -63.8 -61.1 -63.7 57 -99 SPO 1997 04 01 22 03 57 4.6 -9 673.30 -63.8 -61.2 -63.8 56 -99 SPO 1997 04 01 22 04 57 4.7 -9 673.30 -63.9 -61.2 -63.8 56 -99 SPO 1997 04 01 22 05 57 4.9 -9 673.30 -64.0 -61.2 -63.9 57 -99 SPO 1997 04 01 22 06 57 4.9 -9 673.30 -64.0 -61.2 -63.9 56 -99 SPO 1997 04 01 22 07 57 4.9 -9 673.30 -64.0 -61.2 -64.0 56 -99 SPO 1997 04 01 22 08 58 5.0 -9 673.30 -64.0 -61.2 -64.0 56 -99 SPO 1997 04 01 22 09 58 5.0 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 10 57 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 11 57 5.3 -9 673.30 -64.1 -61.1 -64.0 57 -99 SPO 1997 04 01 22 12 56 5.3 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 13 56 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 14 57 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 15 58 5.1 -9 673.30 -63.9 -61.1 -63.9 54 -99 SPO 1997 04 01 22 16 59 5.0 -9 673.30 -63.9 -61.1 -63.9 54 -99 SPO 1997 04 01 22 17 60 5.0 -9 673.30 -63.9 -61.2 -64.0 55 -99 SPO 1997 04 01 22 18 60 4.9 -9 673.30 -63.9 -61.2 -64.0 56 -99 SPO 1997 04 01 22 19 58 5.0 -9 673.30 -63.9 -61.2 -64.0 56 -99 SPO 1997 04 01 22 20 56 5.1 -9 673.30 -64.0 -61.2 -64.0 57 -99 SPO 1997 04 01 22 21 55 5.3 -9 673.30 -64.0 -61.1 -64.0 58 -99 SPO 1997 04 01 22 22 56 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 23 57 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 24 57 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 25 58 5.2 -9 673.30 -64.0 -61.0 -64.1 57 -99 SPO 1997 04 01 22 26 57 5.3 -9 673.30 -64.1 -61.0 -64.1 58 -99 SPO 1997 04 01 22 27 56 5.6 -9 673.30 -64.1 -61.0 -64.2 57 -99 SPO 1997 04 01 22 28 55 5.8 -9 673.30 -64.1 -60.9 -64.2 56 -99 SPO 1997 04 01 22 29 54 6.0 -9 673.30 -64.1 -60.9 -64.2 56 -99 SPO 1997 04 01 22 30 53 6.2 -9 673.30 -64.1 -60.8 -64.2 56 -99 SPO 1997 04 01 22 31 53 6.2 -9 673.20 -64.1 -60.8 -64.1 57 -99 SPO 1997 04 01 22 32 53 6.3 -9 673.20 -64.1 -60.8 -64.1 58 -99 SPO 1997 04 01 22 33 53 6.4 -9 673.20 -64.1 -60.9 -64.1 58 -99 SPO 1997 04 01 22 34 53 6.5 -9 673.20 -64.1 -60.8 -64.1 58 -99 SPO 1997 04 01 22 35 53 6.5 -9 673.20 -64.0 -60.8 -64.1 58 -99 SPO 1997 04 01 22 36 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 37 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 38 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 39 53 6.3 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 40 53 6.3 -9 673.20 -64.0 -60.7 -64.1 57 -99 SPO 1997 04 01 22 41 53 6.3 -9 673.20 -63.9 -60.7 -64.1 57 -99 SPO 1997 04 01 22 42 53 6.4 -9 673.20 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 43 53 6.5 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 44 53 6.6 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 45 52 6.8 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 46 52 6.9 -9 673.20 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 47 51 7.0 -9 673.10 -64.0 -60.8 -64.1 59 -99 SPO 1997 04 01 22 48 49 7.2 -9 673.10 -64.0 -60.8 -64.1 59 -99 SPO 1997 04 01 22 49 49 7.2 -9 673.10 -64.0 -60.8 -64.1 58 -99 SPO 1997 04 01 22 50 48 7.2 -9 673.10 -64.0 -60.8 -64.0 58 -99 SPO 1997 04 01 22 51 49 7.1 -9 673.10 -64.0 -60.8 -64.0 58 -99 SPO 1997 04 01 22 52 49 7.0 -9 673.10 -63.9 -60.8 -64.0 57 -99 SPO 1997 04 01 22 53 48 6.9 -9 673.10 -63.9 -60.7 -64.0 58 -99 SPO 1997 04 01 22 54 48 6.9 -9 673.10 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 55 48 6.9 -9 673.10 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 56 47 7.0 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 57 47 7.0 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 58 47 7.1 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 59 47 7.1 -9 673.00 -64.1 -60.6 -64.1 58 -99 SPO 1997 04 01 23 00 47 7.2 -9 673.00 -64.0 -60.6 -64.1 57 0 SPO 1997 04 01 23 01 46 7.3 -9 673.00 -64.0 -60.7 -64.1 56 -99 SPO 1997 04 01 23 02 47 7.3 -9 673.00 -64.0 -60.7 -64.1 56 -99 SPO 1997 04 01 23 03 47 7.5 -9 673.00 -64.0 -60.7 -64.1 57 -99 SPO 1997 04 01 23 04 47 7.5 -9 673.00 -64.0 -60.7 -64.0 58 -99 SPO 1997 04 01 23 05 48 7.4 -9 673.00 -63.9 -60.7 -64.0 58 -99 SPO 1997 04 01 23 06 48 7.3 -9 673.00 -63.9 -60.7 -64.0 59 -99 SPO 1997 04 01 23 07 49 7.0 -9 673.00 -63.9 -60.7 -64.0 59 -99 SPO 1997 04 01 23 08 49 6.9 -9 673.10 -63.8 -60.8 -64.0 59 -99 SPO 1997 04 01 23 09 48 6.9 -9 673.10 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 10 49 6.9 -9 673.00 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 11 48 6.9 -9 673.10 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 12 48 6.7 -9 673.10 -63.8 -60.9 -63.9 59 -99 SPO 1997 04 01 23 13 48 6.6 -9 673.10 -63.7 -61.0 -63.8 58 -99 SPO 1997 04 01 23 14 47 6.4 -9 673.10 -63.7 -61.0 -63.8 57 -99 SPO 1997 04 01 23 15 47 6.2 -9 673.10 -63.7 -61.1 -63.8 57 -99 SPO 1997 04 01 23 16 47 6.0 -9 673.10 -63.7 -61.2 -63.8 58 -99 SPO 1997 04 01 23 17 48 5.8 -9 673.20 -63.6 -61.4 -63.8 58 -99 SPO 1997 04 01 23 18 48 5.7 -9 673.20 -63.6 -61.4 -63.7 59 -99 SPO 1997 04 01 23 19 49 5.8 -9 673.20 -63.6 -61.5 -63.7 59 -99 SPO 1997 04 01 23 20 49 5.7 -9 673.20 -63.6 -61.5 -63.7 60 -99 SPO 1997 04 01 23 21 49 5.4 -9 673.20 -63.6 -61.6 -63.7 60 -99 SPO 1997 04 01 23 22 50 5.3 -9 673.20 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 23 50 4.9 -9 673.20 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 24 52 4.8 -9 673.30 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 25 52 4.4 -9 673.30 -63.6 -61.7 -63.7 58 -99 SPO 1997 04 01 23 26 53 4.5 -9 673.30 -63.6 -61.7 -63.8 58 -99 SPO 1997 04 01 23 27 52 4.3 -9 673.30 -63.6 -61.7 -63.8 58 -99 SPO 1997 04 01 23 28 52 4.5 -9 673.30 -63.7 -61.7 -63.8 58 -99 SPO 1997 04 01 23 29 51 4.7 -9 673.30 -63.7 -61.6 -63.9 58 -99 SPO 1997 04 01 23 30 49 4.7 -9 673.30 -63.7 -61.6 -63.8 58 -99 SPO 1997 04 01 23 31 47 4.9 -9 673.30 -63.7 -61.7 -63.8 59 -99 SPO 1997 04 01 23 32 47 4.8 -9 673.30 -63.7 -61.6 -63.8 59 -99 SPO 1997 04 01 23 33 46 4.9 -9 673.30 -63.7 -61.6 -63.8 59 -99 SPO 1997 04 01 23 34 46 5.0 -9 673.30 -63.7 -61.6 -63.8 58 -99 SPO 1997 04 01 23 35 45 5.3 -9 673.30 -63.7 -61.6 -63.7 58 -99 SPO 1997 04 01 23 36 45 5.5 -9 673.30 -63.6 -61.5 -63.7 57 -99 SPO 1997 04 01 23 37 44 5.8 -9 673.20 -63.6 -61.5 -63.7 58 -99 SPO 1997 04 01 23 38 43 6.2 -9 673.20 -63.6 -61.4 -63.6 59 -99 SPO 1997 04 01 23 39 42 6.3 -9 673.20 -63.5 -61.3 -63.5 59 -99 SPO 1997 04 01 23 40 41 6.6 -9 673.20 -63.4 -61.3 -63.4 59 -99 SPO 1997 04 01 23 41 42 6.7 -9 673.20 -63.3 -61.2 -63.3 60 -99 SPO 1997 04 01 23 42 41 6.7 -9 673.10 -63.2 -61.2 -63.3 60 -99 SPO 1997 04 01 23 43 41 6.9 -9 673.10 -63.2 -61.1 -63.2 60 -99 SPO 1997 04 01 23 44 41 6.9 -9 673.10 -63.1 -61.1 -63.2 60 -99 SPO 1997 04 01 23 45 41 6.8 -9 673.10 -63.0 -61.1 -63.1 60 -99 SPO 1997 04 01 23 46 41 6.9 -9 673.20 -63.0 -61.1 -63.1 60 -99 SPO 1997 04 01 23 47 42 6.6 -9 673.20 -62.9 -61.1 -63.0 59 -99 SPO 1997 04 01 23 48 42 6.3 -9 673.20 -62.8 -61.1 -63.0 58 -99 SPO 1997 04 01 23 49 42 6.1 -9 673.30 -62.8 -61.2 -62.9 58 -99 SPO 1997 04 01 23 50 42 5.8 -9 673.30 -62.7 -61.2 -62.9 58 -99 SPO 1997 04 01 23 51 42 5.9 -9 673.30 -62.7 -61.2 -62.9 59 -99 SPO 1997 04 01 23 52 42 5.9 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 53 42 5.9 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 54 42 6.1 -9 673.30 -62.7 -61.2 -62.9 61 -99 SPO 1997 04 01 23 55 43 6.1 -9 673.30 -62.7 -61.2 -62.8 61 -99 SPO 1997 04 01 23 56 44 6.1 -9 673.30 -62.7 -61.2 -62.8 60 -99 SPO 1997 04 01 23 57 43 6.0 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 58 44 6.1 -9 673.30 -62.7 -61.2 -62.8 -99 -99 SPO 1997 04 01 23 59 44 6.0 -9 673.30 -62.7 -61.2 -62.8 -99 -99 SPO 1997 04 02 00 00 44 5.7 -9 673.30 -62.7 -61.3 -62.8 -99 0 SPO 1997 04 02 00 01 45 5.7 -9 673.40 -62.7 -61.3 -62.9 -99 -99 SPO 1997 04 02 00 02 45 5.3 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 03 46 5.0 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 04 46 4.8 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 05 46 4.5 -9 673.50 -62.7 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 06 47 4.5 -9 673.50 -62.8 -61.5 -62.9 -99 -99 SPO 1997 04 02 00 07 46 4.5 -9 673.50 -62.8 -61.5 -62.9 -99 -99 SPO 1997 04 02 00 08 46 4.7 -9 673.50 -62.8 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 09 45 4.8 -9 673.50 -62.8 -61.5 -63.0 -99 -99 SPO 1997 04 02 00 10 45 5.0 -9 673.40 -62.9 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 11 44 5.2 -9 673.40 -62.9 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 12 43 5.1 -9 673.40 -63.0 -61.4 -63.1 -99 -99 SPO 1997 04 02 00 13 42 5.1 -9 673.40 -63.0 -61.4 -63.1 58 -99 SPO 1997 04 02 00 14 42 5.2 -9 673.50 -63.0 -61.4 -63.1 58 -99 SPO 1997 04 02 00 15 42 5.1 -9 673.50 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 00 16 42 4.9 -9 673.50 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 00 17 43 4.8 -9 673.50 -63.0 -61.4 -63.2 59 -99 SPO 1997 04 02 00 18 43 4.5 -9 673.60 -63.1 -61.4 -63.2 60 -99 SPO 1997 04 02 00 19 43 4.3 -9 673.60 -63.1 -61.4 -63.2 60 -99 SPO 1997 04 02 00 20 44 4.1 -9 673.60 -63.2 -61.4 -63.2 60 -99 SPO 1997 04 02 00 21 45 4.1 -9 673.60 -63.2 -61.4 -63.3 59 -99 SPO 1997 04 02 00 22 46 4.0 -9 673.60 -63.2 -61.4 -63.3 58 -99 SPO 1997 04 02 00 23 46 4.0 -9 673.60 -63.3 -61.4 -63.4 58 -99 SPO 1997 04 02 00 24 46 4.0 -9 673.60 -63.3 -61.4 -63.4 57 -99 SPO 1997 04 02 00 25 46 4.0 -9 673.60 -63.4 -61.4 -63.5 58 -99 SPO 1997 04 02 00 26 46 4.0 -9 673.60 -63.5 -61.4 -63.5 58 -99 SPO 1997 04 02 00 27 46 3.9 -9 673.60 -63.6 -61.4 -63.6 58 -99 SPO 1997 04 02 00 28 45 4.1 -9 673.60 -63.8 -61.4 -63.8 59 -99 SPO 1997 04 02 00 29 45 4.1 -9 673.60 -64.0 -61.4 -63.9 59 -99 SPO 1997 04 02 00 30 44 4.3 -9 673.60 -64.2 -61.5 -64.0 59 -99 SPO 1997 04 02 00 31 45 4.4 -9 673.60 -64.4 -61.5 -64.2 59 -99 SPO 1997 04 02 00 32 45 4.5 -9 673.60 -64.6 -61.4 -64.4 65 -99 SPO 1997 04 02 00 33 45 4.7 -9 673.60 -64.8 -61.4 -64.5 57 -99 SPO 1997 04 02 00 34 44 4.8 -9 673.60 -64.9 -61.4 -64.6 56 -99 SPO 1997 04 02 00 35 45 4.8 -9 673.50 -65.0 -61.4 -64.7 55 -99 SPO 1997 04 02 00 36 45 4.9 -9 673.50 -65.0 -61.3 -64.7 55 -99 SPO 1997 04 02 00 37 45 5.0 -9 673.50 -65.1 -61.3 -64.8 55 -99 SPO 1997 04 02 00 38 45 5.1 -9 673.50 -65.2 -61.3 -64.9 56 -99 SPO 1997 04 02 00 39 45 5.1 -9 673.50 -65.2 -61.3 -64.9 55 -99 SPO 1997 04 02 00 40 46 5.2 -9 673.50 -65.2 -61.2 -65.0 56 -99 SPO 1997 04 02 00 41 46 5.2 -9 673.50 -65.2 -61.2 -64.9 56 -99 SPO 1997 04 02 00 42 47 5.0 -9 673.50 -65.2 -61.2 -65.0 55 -99 SPO 1997 04 02 00 43 47 5.1 -9 673.50 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 44 47 5.1 -9 673.50 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 45 47 5.3 -9 673.40 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 46 46 5.4 -9 673.40 -65.2 -61.3 -65.1 55 -99 SPO 1997 04 02 00 47 46 5.6 -9 673.40 -65.3 -61.2 -65.2 55 -99 SPO 1997 04 02 00 48 46 5.7 -9 673.40 -65.3 -61.2 -65.2 55 -99 SPO 1997 04 02 00 49 46 5.8 -9 673.30 -65.3 -61.2 -65.2 56 -99 SPO 1997 04 02 00 50 46 5.8 -9 673.30 -65.2 -61.2 -65.2 55 -99 SPO 1997 04 02 00 51 46 5.8 -9 673.30 -65.2 -61.1 -65.2 56 -99 SPO 1997 04 02 00 52 46 5.6 -9 673.30 -65.2 -61.1 -65.1 56 -99 SPO 1997 04 02 00 53 46 5.4 -9 673.40 -65.1 -61.2 -65.1 56 -99 SPO 1997 04 02 00 54 46 5.3 -9 673.40 -65.1 -61.2 -65.1 56 -99 SPO 1997 04 02 00 55 47 5.2 -9 673.40 -65.0 -61.2 -65.0 55 -99 SPO 1997 04 02 00 56 48 5.3 -9 673.40 -65.0 -61.2 -65.0 55 -99 SPO 1997 04 02 00 57 48 5.3 -9 673.30 -64.9 -61.2 -64.9 55 -99 SPO 1997 04 02 00 58 48 5.4 -9 673.30 -64.8 -61.2 -64.9 55 -99 SPO 1997 04 02 00 59 48 5.3 -9 673.30 -64.8 -61.3 -64.8 57 -99 SPO 1997 04 02 01 00 48 5.3 -9 673.30 -64.7 -61.3 -64.8 57 0 SPO 1997 04 02 01 01 48 5.2 -9 673.30 -64.7 -61.4 -64.8 58 -99 SPO 1997 04 02 01 02 48 5.3 -9 673.30 -64.6 -61.4 -64.7 58 -99 SPO 1997 04 02 01 03 47 5.5 -9 673.30 -64.6 -61.4 -64.7 59 -99 SPO 1997 04 02 01 04 46 5.7 -9 673.30 -64.5 -61.4 -64.6 59 -99 SPO 1997 04 02 01 05 46 5.6 -9 673.30 -64.4 -61.4 -64.6 59 -99 SPO 1997 04 02 01 06 46 5.7 -9 673.30 -64.4 -61.4 -64.5 59 -99 SPO 1997 04 02 01 07 46 5.5 -9 673.30 -64.3 -61.4 -64.5 58 -99 SPO 1997 04 02 01 08 47 5.3 -9 673.30 -64.3 -61.4 -64.4 58 -99 SPO 1997 04 02 01 09 47 5.2 -9 673.30 -64.2 -61.4 -64.4 58 -99 SPO 1997 04 02 01 10 47 5.3 -9 673.30 -64.2 -61.4 -64.4 59 -99 SPO 1997 04 02 01 11 47 5.5 -9 673.30 -64.2 -61.4 -64.4 59 -99 SPO 1997 04 02 01 12 46 5.7 -9 673.30 -64.2 -61.4 -64.3 59 -99 SPO 1997 04 02 01 13 46 5.6 -9 673.30 -64.2 -61.4 -64.3 59 -99 SPO 1997 04 02 01 14 45 5.7 -9 673.30 -64.1 -61.5 -64.3 59 -99 SPO 1997 04 02 01 15 45 5.8 -9 673.30 -64.1 -61.4 -64.2 59 -99 SPO 1997 04 02 01 16 44 5.9 -9 673.30 -64.1 -61.4 -64.2 60 -99 SPO 1997 04 02 01 17 43 6.3 -9 673.30 -64.0 -61.4 -64.1 59 -99 SPO 1997 04 02 01 18 42 6.6 -9 673.20 -63.9 -61.4 -64.0 59 -99 SPO 1997 04 02 01 19 41 6.9 -9 673.20 -63.8 -61.3 -63.9 58 -99 SPO 1997 04 02 01 20 41 7.0 -9 673.10 -63.8 -61.2 -63.8 59 -99 SPO 1997 04 02 01 21 41 7.1 -9 673.10 -63.7 -61.2 -63.8 58 -99 SPO 1997 04 02 01 22 40 7.2 -9 673.10 -63.6 -61.1 -63.7 59 -99 SPO 1997 04 02 01 23 39 7.1 -9 673.20 -63.6 -61.1 -63.7 60 -99 SPO 1997 04 02 01 24 40 6.9 -9 673.20 -63.5 -61.1 -63.6 60 -99 SPO 1997 04 02 01 25 40 6.8 -9 673.20 -63.4 -61.0 -63.6 60 -99 SPO 1997 04 02 01 26 39 6.8 -9 673.20 -63.4 -61.0 -63.5 60 -99 SPO 1997 04 02 01 27 40 6.7 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 28 39 6.7 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 29 40 6.7 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 30 40 6.5 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 31 40 6.3 -9 673.30 -63.2 -61.2 -63.4 59 -99 SPO 1997 04 02 01 32 40 6.2 -9 673.30 -63.2 -61.3 -63.4 59 -99 SPO 1997 04 02 01 33 42 6.1 -9 673.40 -63.2 -61.3 -63.4 59 -99 SPO 1997 04 02 01 34 43 5.9 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 35 44 5.8 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 36 44 5.8 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 37 45 5.9 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 38 44 5.8 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 39 44 5.9 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 40 44 5.8 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 41 43 6.0 -9 673.40 -63.3 -61.3 -63.5 59 -99 SPO 1997 04 02 01 42 43 5.9 -9 673.40 -63.3 -61.3 -63.5 59 -99 SPO 1997 04 02 01 43 42 6.0 -9 673.40 -63.4 -61.3 -63.5 60 -99 SPO 1997 04 02 01 44 42 6.0 -9 673.40 -63.4 -61.4 -63.5 59 -99 SPO 1997 04 02 01 45 42 6.2 -9 673.40 -63.4 -61.4 -63.5 59 -99 SPO 1997 04 02 01 46 41 6.4 -9 673.30 -63.4 -61.4 -63.5 60 -99 SPO 1997 04 02 01 47 41 6.5 -9 673.30 -63.4 -61.3 -63.4 60 -99 SPO 1997 04 02 01 48 41 6.4 -9 673.30 -63.4 -61.3 -63.4 60 -99 SPO 1997 04 02 01 49 42 6.6 -9 673.30 -63.4 -61.2 -63.4 60 -99 SPO 1997 04 02 01 50 42 6.6 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 51 42 6.4 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 52 43 6.3 -9 673.40 -63.3 -61.2 -63.4 59 -99 SPO 1997 04 02 01 53 43 6.2 -9 673.40 -63.3 -61.2 -63.5 58 -99 SPO 1997 04 02 01 54 43 6.2 -9 673.40 -63.4 -61.2 -63.5 59 -99 SPO 1997 04 02 01 55 43 6.3 -9 673.30 -63.4 -61.2 -63.5 58 -99 SPO 1997 04 02 01 56 43 6.6 -9 673.30 -63.3 -61.2 -63.4 57 -99 SPO 1997 04 02 01 57 42 6.6 -9 673.30 -63.3 -61.2 -63.5 58 -99 SPO 1997 04 02 01 58 41 6.6 -9 673.30 -63.4 -61.2 -63.4 59 -99 SPO 1997 04 02 01 59 41 6.7 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 00 42 6.8 -9 673.30 -63.4 -61.2 -63.5 60 0 SPO 1997 04 02 02 01 42 6.8 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 02 42 6.9 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 03 42 7.0 -9 673.30 -63.4 -61.1 -63.5 60 -99 SPO 1997 04 02 02 04 43 6.8 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 05 43 6.7 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 06 43 6.6 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 07 43 6.6 -9 673.30 -63.4 -61.0 -63.5 58 -99 SPO 1997 04 02 02 08 43 6.4 -9 673.30 -63.4 -61.0 -63.5 58 -99 SPO 1997 04 02 02 09 43 6.3 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 10 44 6.1 -9 673.40 -63.4 -61.1 -63.5 58 -99 SPO 1997 04 02 02 11 44 6.0 -9 673.40 -63.4 -61.1 -63.5 58 -99 SPO 1997 04 02 02 12 44 6.0 -9 673.40 -63.4 -61.2 -63.6 59 -99 SPO 1997 04 02 02 13 43 6.0 -9 673.40 -63.5 -61.2 -63.6 60 -99 SPO 1997 04 02 02 14 44 6.0 -9 673.30 -63.5 -61.2 -63.6 60 -99 SPO 1997 04 02 02 15 44 6.0 -9 673.30 -63.5 -61.2 -63.6 59 -99 SPO 1997 04 02 02 16 45 5.9 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 17 45 5.7 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 18 46 5.5 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 19 47 5.3 -9 673.40 -63.6 -61.4 -63.8 58 -99 SPO 1997 04 02 02 20 47 5.3 -9 673.40 -63.7 -61.4 -63.8 59 -99 SPO 1997 04 02 02 21 47 5.3 -9 673.40 -63.7 -61.4 -63.9 58 -99 SPO 1997 04 02 02 22 48 5.4 -9 673.40 -63.8 -61.4 -63.9 59 -99 SPO 1997 04 02 02 23 48 5.4 -9 673.40 -63.9 -61.4 -64.0 59 -99 SPO 1997 04 02 02 24 50 5.3 -9 673.40 -64.0 -61.5 -64.1 59 -99 SPO 1997 04 02 02 25 51 5.0 -9 673.50 -64.0 -61.6 -64.1 57 -99 SPO 1997 04 02 02 26 52 4.7 -9 673.50 -64.1 -61.6 -64.2 57 -99 SPO 1997 04 02 02 27 53 4.5 -9 673.60 -64.2 -61.8 -64.3 57 -99 SPO 1997 04 02 02 28 54 4.3 -9 673.60 -64.4 -61.8 -64.4 58 -99 SPO 1997 04 02 02 29 54 4.3 -9 673.60 -64.5 -61.9 -64.5 58 -99 SPO 1997 04 02 02 30 52 4.4 -9 673.60 -64.6 -61.9 -64.6 61 -99 SPO 1997 04 02 02 31 53 4.4 -9 673.60 -64.8 -61.9 -64.7 59 -99 SPO 1997 04 02 02 32 54 4.4 -9 673.60 -64.8 -62.0 -64.8 57 -99 SPO 1997 04 02 02 33 54 4.4 -9 673.60 -65.0 -62.0 -64.9 58 -99 SPO 1997 04 02 02 34 54 4.4 -9 673.60 -65.2 -61.9 -65.1 58 -99 SPO 1997 04 02 02 35 53 4.7 -9 673.60 -65.3 -61.9 -65.2 58 -99 SPO 1997 04 02 02 36 51 4.9 -9 673.60 -65.4 -61.9 -65.3 57 -99 SPO 1997 04 02 02 37 51 4.9 -9 673.60 -65.5 -61.8 -65.3 56 -99 SPO 1997 04 02 02 38 51 5.0 -9 673.60 -65.6 -61.8 -65.4 56 -99 SPO 1997 04 02 02 39 51 5.0 -9 673.50 -65.6 -61.8 -65.5 55 -99 SPO 1997 04 02 02 40 52 4.9 -9 673.50 -65.6 -61.8 -65.5 55 -99 SPO 1997 04 02 02 41 52 4.8 -9 673.50 -65.7 -61.9 -65.5 54 -99 SPO 1997 04 02 02 42 52 4.8 -9 673.60 -65.7 -61.9 -65.5 54 -99 SPO 1997 04 02 02 43 50 4.8 -9 673.60 -65.7 -61.9 -65.5 55 -99 SPO 1997 04 02 02 44 49 4.8 -9 673.50 -65.7 -61.9 -65.5 55 -99 SPO 1997 04 02 02 45 48 5.0 -9 673.50 -65.7 -61.8 -65.5 55 -99 SPO 1997 04 02 02 46 50 4.9 -9 673.50 -65.7 -61.9 -65.6 55 -99 SPO 1997 04 02 02 47 50 5.0 -9 673.50 -65.7 -61.8 -65.7 55 -99 SPO 1997 04 02 02 48 51 4.9 -9 673.50 -65.8 -61.9 -65.8 55 -99 SPO 1997 04 02 02 49 50 5.3 -9 673.50 -65.8 -61.8 -65.8 54 -99 SPO 1997 04 02 02 50 49 5.4 -9 673.50 -65.9 -61.8 -65.9 54 -99 SPO 1997 04 02 02 51 48 5.5 -9 673.40 -65.9 -61.7 -65.9 54 -99 SPO 1997 04 02 02 52 47 5.7 -9 673.40 -66.0 -61.6 -66.0 54 -99 SPO 1997 04 02 02 53 48 5.7 -9 673.40 -66.0 -61.6 -66.0 54 -99 SPO 1997 04 02 02 54 48 5.6 -9 673.40 -66.0 -61.6 -66.0 55 -99 SPO 1997 04 02 02 55 50 5.5 -9 673.50 -66.0 -61.6 -66.0 55 -99 SPO 1997 04 02 02 56 50 5.3 -9 673.50 -66.0 -61.7 -65.9 56 -99 SPO 1997 04 02 02 57 50 5.2 -9 673.50 -66.0 -61.8 -65.9 57 -99 SPO 1997 04 02 02 58 49 5.4 -9 673.50 -65.9 -61.7 -65.9 56 -99 SPO 1997 04 02 02 59 49 5.4 -9 673.50 -65.9 -61.7 -65.9 56 -99 SPO 1997 04 02 03 00 49 5.7 -9 673.50 -65.9 -61.7 -65.9 56 0 SPO 1997 04 02 03 01 48 5.5 -9 673.50 -65.9 -61.7 -65.9 55 -99 SPO 1997 04 02 03 02 49 5.4 -9 673.60 -65.9 -61.7 -65.9 55 -99 SPO 1997 04 02 03 03 49 5.2 -9 673.60 -65.8 -61.7 -65.9 55 -99 SPO 1997 04 02 03 04 50 5.1 -9 673.60 -65.8 -61.7 -65.9 55 -99 SPO 1997 04 02 03 05 50 5.0 -9 673.70 -65.8 -61.6 -65.9 56 -99 SPO 1997 04 02 03 06 49 5.0 -9 673.70 -65.8 -61.6 -65.9 57 -99 SPO 1997 04 02 03 07 48 5.3 -9 673.70 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 08 48 5.5 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 09 47 5.7 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 10 46 6.0 -9 673.60 -65.9 -61.5 -66.0 57 -99 SPO 1997 04 02 03 11 46 6.1 -9 673.60 -65.9 -61.5 -66.0 57 -99 SPO 1997 04 02 03 12 46 6.0 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 13 47 5.8 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 14 48 5.6 -9 673.60 -65.9 -61.7 -65.9 57 -99 SPO 1997 04 02 03 15 48 5.5 -9 673.60 -65.8 -61.7 -65.9 56 -99 SPO 1997 04 02 03 16 47 5.7 -9 673.60 -65.8 -61.7 -65.8 57 -99 SPO 1997 04 02 03 17 46 6.0 -9 673.60 -65.7 -61.6 -65.8 56 -99 SPO 1997 04 02 03 18 45 6.2 -9 673.60 -65.7 -61.6 -65.8 57 -99 SPO 1997 04 02 03 19 44 6.4 -9 673.50 -65.6 -61.5 -65.7 58 -99 SPO 1997 04 02 03 20 44 6.5 -9 673.50 -65.6 -61.5 -65.7 58 -99 SPO 1997 04 02 03 21 43 6.6 -9 673.50 -65.6 -61.5 -65.6 58 -99 SPO 1997 04 02 03 22 43 6.7 -9 673.50 -65.5 -61.4 -65.6 58 -99 SPO 1997 04 02 03 23 43 6.9 -9 673.40 -65.5 -61.4 -65.5 58 -99 SPO 1997 04 02 03 24 42 7.1 -9 673.40 -65.4 -61.3 -65.5 58 -99 SPO 1997 04 02 03 25 41 6.8 -9 673.40 -65.3 -61.3 -65.4 58 -99 SPO 1997 04 02 03 26 41 6.7 -9 673.50 -65.3 -61.4 -65.4 58 -99 SPO 1997 04 02 03 27 41 6.5 -9 673.50 -65.2 -61.4 -65.2 58 -99 SPO 1997 04 02 03 28 42 6.2 -9 673.50 -65.1 -61.4 -65.2 58 -99 SPO 1997 04 02 03 29 43 6.3 -9 673.50 -65.0 -61.4 -65.1 58 -99 SPO 1997 04 02 03 30 43 6.3 -9 673.50 -65.0 -61.3 -65.0 59 -99 SPO 1997 04 02 03 31 43 6.0 -9 673.60 -64.9 -61.4 -65.0 59 -99 SPO 1997 04 02 03 32 43 5.8 -9 673.60 -64.8 -61.4 -65.0 59 -99 SPO 1997 04 02 03 33 43 5.5 -9 673.60 -64.8 -61.6 -65.0 59 -99 SPO 1997 04 02 03 34 43 5.3 -9 673.70 -64.8 -61.7 -64.9 59 -99 SPO 1997 04 02 03 35 43 5.5 -9 673.70 -64.7 -61.8 -64.9 58 -99 SPO 1997 04 02 03 36 42 5.4 -9 673.70 -64.7 -61.8 -64.8 59 -99 SPO 1997 04 02 03 37 42 5.3 -9 673.70 -64.7 -61.8 -64.8 59 -99 SPO 1997 04 02 03 38 42 5.3 -9 673.70 -64.6 -61.8 -64.8 58 -99 SPO 1997 04 02 03 39 42 5.5 -9 673.70 -64.6 -61.8 -64.8 59 -99 SPO 1997 04 02 03 40 41 5.9 -9 673.60 -64.6 -61.9 -64.7 59 -99 SPO 1997 04 02 03 41 40 6.2 -9 673.60 -64.6 -61.9 -64.7 60 -99 SPO 1997 04 02 03 42 39 6.3 -9 673.60 -64.5 -61.9 -64.6 60 -99 SPO 1997 04 02 03 43 39 6.7 -9 673.60 -64.4 -61.8 -64.5 60 -99 SPO 1997 04 02 03 44 39 6.8 -9 673.60 -64.3 -61.7 -64.3 60 -99 SPO 1997 04 02 03 45 40 7.3 -9 673.50 -64.2 -61.6 -64.2 60 -99 SPO 1997 04 02 03 46 39 7.4 -9 673.40 -64.1 -61.5 -64.1 59 -99 SPO 1997 04 02 03 47 38 7.7 -9 673.40 -64.0 -61.4 -64.0 59 -99 SPO 1997 04 02 03 48 38 7.8 -9 673.40 -63.9 -61.4 -63.8 59 -99 SPO 1997 04 02 03 49 37 7.9 -9 673.40 -63.8 -61.3 -63.8 60 -99 SPO 1997 04 02 03 50 37 8.3 -9 673.30 -63.7 -61.2 -63.7 60 -99 SPO 1997 04 02 03 51 36 8.3 -9 673.30 -63.6 -61.2 -63.6 60 -99 SPO 1997 04 02 03 52 37 8.3 -9 673.30 -63.5 -61.1 -63.5 61 -99 SPO 1997 04 02 03 53 35 8.1 -9 673.30 -63.4 -61.2 -63.4 62 -99 SPO 1997 04 02 03 54 35 8.0 -9 673.30 -63.3 -61.2 -63.3 62 -99 SPO 1997 04 02 03 55 35 7.8 -9 673.30 -63.2 -61.2 -63.2 62 -99 SPO 1997 04 02 03 56 35 7.5 -9 673.40 -63.1 -61.3 -63.2 62 -99 SPO 1997 04 02 03 57 34 7.2 -9 673.40 -63.0 -61.3 -63.1 61 -99 SPO 1997 04 02 03 58 35 6.8 -9 673.50 -63.0 -61.4 -63.1 61 -99 SPO 1997 04 02 03 59 35 6.9 -9 673.50 -63.0 -61.4 -63.1 61 -99 SPO 1997 04 02 04 00 35 6.9 -9 673.50 -62.9 -61.4 -63.0 60 0 SPO 1997 04 02 04 01 34 7.2 -9 673.50 -62.9 -61.4 -63.0 60 -99 SPO 1997 04 02 04 02 34 7.1 -9 673.50 -62.8 -61.4 -63.0 60 -99 SPO 1997 04 02 04 03 33 7.2 -9 673.40 -62.8 -61.4 -62.9 61 -99 SPO 1997 04 02 04 04 33 7.0 -9 673.50 -62.7 -61.4 -62.8 61 -99 SPO 1997 04 02 04 05 33 6.8 -9 673.50 -62.7 -61.3 -62.8 62 -99 SPO 1997 04 02 04 06 32 6.3 -9 673.60 -62.7 -61.4 -62.8 62 -99 SPO 1997 04 02 04 07 33 6.7 -9 673.60 -62.7 -61.4 -62.8 64 -99 SPO 1997 04 02 04 08 33 6.4 -9 673.60 -62.6 -61.4 -62.8 63 -99 SPO 1997 04 02 04 09 33 6.5 -9 673.60 -62.6 -61.4 -62.8 63 -99 SPO 1997 04 02 04 10 33 6.5 -9 673.60 -62.6 -61.4 -62.7 64 -99 SPO 1997 04 02 04 11 33 6.4 -9 673.60 -62.6 -61.4 -62.7 64 -99 SPO 1997 04 02 04 12 33 6.6 -9 673.60 -62.6 -61.4 -62.6 63 -99 SPO 1997 04 02 04 13 33 6.6 -9 673.60 -62.6 -61.4 -62.6 64 -99 SPO 1997 04 02 04 14 34 6.8 -9 673.60 -62.5 -61.4 -62.6 63 -99 SPO 1997 04 02 04 15 33 6.8 -9 673.50 -62.5 -61.3 -62.6 63 -99 SPO 1997 04 02 04 16 34 6.7 -9 673.50 -62.5 -61.3 -62.6 64 -99 SPO 1997 04 02 04 17 33 7.0 -9 673.50 -62.5 -61.3 -62.7 64 -99 SPO 1997 04 02 04 18 34 6.8 -9 673.50 -62.5 -61.3 -62.6 64 -99 SPO 1997 04 02 04 19 35 6.4 -9 673.60 -62.5 -61.3 -62.6 63 -99 SPO 1997 04 02 04 20 35 6.1 -9 673.70 -62.5 -61.4 -62.6 63 -99 SPO 1997 04 02 04 21 36 5.8 -9 673.70 -62.5 -61.4 -62.7 61 -99 SPO 1997 04 02 04 22 36 5.6 -9 673.80 -62.5 -61.4 -62.7 60 -99 SPO 1997 04 02 04 23 37 5.8 -9 673.80 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 04 24 37 5.8 -9 673.80 -62.6 -61.6 -62.7 61 -99 SPO 1997 04 02 04 25 37 5.8 -9 673.80 -62.7 -61.6 -62.7 64 -99 SPO 1997 04 02 04 26 37 5.8 -9 673.80 -62.7 -61.6 -62.8 64 -99 SPO 1997 04 02 04 27 37 5.8 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 28 36 5.6 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 29 37 5.7 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 30 37 5.7 -9 673.80 -62.7 -61.7 -62.9 62 -99 SPO 1997 04 02 04 31 38 5.4 -9 673.80 -62.8 -61.7 -62.9 62 -99 SPO 1997 04 02 04 32 38 5.3 -9 673.80 -62.8 -61.7 -63.0 61 -99 SPO 1997 04 02 04 33 38 5.6 -9 673.80 -62.8 -61.7 -63.0 60 -99 SPO 1997 04 02 04 34 37 5.7 -9 673.80 -62.9 -61.6 -63.0 60 -99 SPO 1997 04 02 04 35 37 5.8 -9 673.80 -62.9 -61.6 -63.0 61 -99 SPO 1997 04 02 04 36 37 5.8 -9 673.80 -63.0 -61.6 -63.0 62 -99 SPO 1997 04 02 04 37 37 5.8 -9 673.80 -63.0 -61.6 -63.1 60 -99 SPO 1997 04 02 04 38 36 6.0 -9 673.80 -63.0 -61.6 -63.1 60 -99 SPO 1997 04 02 04 39 36 6.0 -9 673.80 -63.0 -61.6 -63.1 61 -99 SPO 1997 04 02 04 40 36 5.8 -9 673.80 -63.0 -61.6 -63.1 61 -99 SPO 1997 04 02 04 41 37 5.8 -9 673.80 -63.1 -61.6 -63.2 62 -99 SPO 1997 04 02 04 42 37 5.7 -9 673.80 -63.1 -61.6 -63.2 61 -99 SPO 1997 04 02 04 43 37 5.6 -9 673.80 -63.1 -61.6 -63.2 61 -99 SPO 1997 04 02 04 44 37 5.5 -9 673.80 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 04 45 38 5.6 -9 673.80 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 04 46 37 5.6 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 47 37 5.6 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 48 37 5.7 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 49 36 6.0 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 50 36 6.3 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 51 35 6.6 -9 673.70 -63.1 -61.4 -63.1 60 -99 SPO 1997 04 02 04 52 34 6.7 -9 673.70 -63.1 -61.4 -63.1 60 -99 SPO 1997 04 02 04 53 34 6.7 -9 673.70 -63.0 -61.4 -63.1 60 -99 SPO 1997 04 02 04 54 34 6.7 -9 673.70 -63.0 -61.4 -63.0 60 -99 SPO 1997 04 02 04 55 34 6.9 -9 673.70 -62.9 -61.3 -63.0 59 -99 SPO 1997 04 02 04 56 34 7.1 -9 673.70 -62.9 -61.3 -63.0 59 -99 SPO 1997 04 02 04 57 34 7.0 -9 673.70 -62.8 -61.3 -63.0 58 -99 SPO 1997 04 02 04 58 34 7.1 -9 673.70 -62.8 -61.3 -62.9 58 -99 SPO 1997 04 02 04 59 34 6.7 -9 673.70 -62.8 -61.3 -62.9 59 -99 SPO 1997 04 02 05 00 35 6.5 -9 673.80 -62.8 -61.3 -62.9 59 0 SPO 1997 04 02 05 01 35 6.2 -9 673.80 -62.8 -61.3 -62.9 59 -99 SPO 1997 04 02 05 02 35 6.4 -9 673.80 -62.8 -61.3 -62.9 60 -99 SPO 1997 04 02 05 03 35 6.5 -9 673.80 -62.8 -61.3 -62.9 60 -99 SPO 1997 04 02 05 04 35 6.5 -9 673.80 -62.8 -61.4 -62.9 60 -99 SPO 1997 04 02 05 05 36 6.6 -9 673.80 -62.8 -61.4 -62.9 60 -99 SPO 1997 04 02 05 06 35 6.6 -9 673.80 -62.8 -61.4 -63.0 60 -99 SPO 1997 04 02 05 07 36 6.4 -9 673.90 -62.8 -61.4 -63.0 59 -99 SPO 1997 04 02 05 08 36 6.4 -9 673.90 -62.8 -61.5 -63.0 58 -99 SPO 1997 04 02 05 09 36 6.3 -9 673.80 -62.8 -61.5 -63.0 57 -99 SPO 1997 04 02 05 10 37 6.6 -9 673.80 -62.9 -61.5 -63.0 58 -99 SPO 1997 04 02 05 11 37 6.7 -9 673.80 -62.9 -61.5 -63.0 58 -99 SPO 1997 04 02 05 12 37 6.7 -9 673.80 -62.9 -61.4 -63.1 58 -99 SPO 1997 04 02 05 13 37 6.6 -9 673.80 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 05 14 37 6.4 -9 673.80 -63.0 -61.5 -63.1 59 -99 SPO 1997 04 02 05 15 38 6.4 -9 673.80 -63.0 -61.5 -63.2 59 -99 SPO 1997 04 02 05 16 38 6.4 -9 673.70 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 05 17 38 6.5 -9 673.70 -63.1 -61.6 -63.3 59 -99 SPO 1997 04 02 05 18 38 6.7 -9 673.70 -63.2 -61.6 -63.3 60 -99 SPO 1997 04 02 05 19 38 6.6 -9 673.70 -63.2 -61.6 -63.3 59 -99 SPO 1997 04 02 05 20 38 6.5 -9 673.70 -63.2 -61.6 -63.4 58 -99 SPO 1997 04 02 05 21 37 6.4 -9 673.70 -63.3 -61.6 -63.4 58 -99 SPO 1997 04 02 05 22 37 6.3 -9 673.80 -63.3 -61.7 -63.4 58 -99 SPO 1997 04 02 05 23 37 6.2 -9 673.80 -63.3 -61.7 -63.3 59 -99 SPO 1997 04 02 05 24 37 6.2 -9 673.80 -63.3 -61.8 -63.3 59 -99 SPO 1997 04 02 05 25 36 6.0 -9 673.80 -63.3 -61.8 -63.4 59 -99 SPO 1997 04 02 05 26 37 6.2 -9 673.80 -63.3 -61.9 -63.4 60 -99 SPO 1997 04 02 05 27 37 6.3 -9 673.70 -63.2 -61.8 -63.3 58 -99 SPO 1997 04 02 05 28 37 6.5 -9 673.70 -63.2 -61.8 -63.3 58 -99 SPO 1997 04 02 05 29 36 6.3 -9 673.70 -63.2 -61.8 -63.3 59 -99 SPO 1997 04 02 05 30 35 6.4 -9 673.70 -63.2 -61.8 -63.2 60 -99 SPO 1997 04 02 05 31 36 6.6 -9 673.70 -63.2 -61.8 -63.2 59 -99 SPO 1997 04 02 05 32 35 6.8 -9 673.70 -63.1 -61.7 -63.2 58 -99 SPO 1997 04 02 05 33 35 6.7 -9 673.60 -63.1 -61.7 -63.1 57 -99 SPO 1997 04 02 05 34 35 6.9 -9 673.60 -63.1 -61.6 -63.1 57 -99 SPO 1997 04 02 05 35 35 7.0 -9 673.60 -63.0 -61.6 -63.1 57 -99 SPO 1997 04 02 05 36 34 7.0 -9 673.60 -63.0 -61.6 -63.0 57 -99 SPO 1997 04 02 05 37 34 6.9 -9 673.60 -62.9 -61.6 -62.9 57 -99 SPO 1997 04 02 05 38 35 6.8 -9 673.60 -62.8 -61.6 -62.9 57 -99 SPO 1997 04 02 05 39 37 6.9 -9 673.60 -62.8 -61.6 -63.0 59 -99 SPO 1997 04 02 05 40 37 6.3 -9 673.70 -62.9 -61.7 -63.0 60 -99 SPO 1997 04 02 05 41 36 6.3 -9 673.70 -62.8 -61.7 -63.0 60 -99 SPO 1997 04 02 05 42 35 6.3 -9 673.70 -62.8 -61.8 -62.9 60 -99 SPO 1997 04 02 05 43 36 6.4 -9 673.70 -62.8 -61.7 -62.9 59 -99 SPO 1997 04 02 05 44 35 6.6 -9 673.70 -62.7 -61.7 -62.8 58 -99 SPO 1997 04 02 05 45 35 6.9 -9 673.70 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 05 46 34 7.3 -9 673.60 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 05 47 35 7.2 -9 673.60 -62.7 -61.5 -62.8 58 -99 SPO 1997 04 02 05 48 35 7.0 -9 673.70 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 05 49 34 7.0 -9 673.70 -62.6 -61.5 -62.8 58 -99 SPO 1997 04 02 05 50 34 6.8 -9 673.70 -62.6 -61.5 -62.8 58 -99 SPO 1997 04 02 05 51 33 6.5 -9 673.70 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 05 52 33 6.8 -9 673.80 -62.6 -61.5 -62.7 59 -99 SPO 1997 04 02 05 53 32 6.5 -9 673.80 -62.6 -61.5 -62.6 60 -99 SPO 1997 04 02 05 54 34 6.6 -9 673.80 -62.6 -61.4 -62.6 61 -99 SPO 1997 04 02 05 55 34 6.8 -9 673.80 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 05 56 35 6.7 -9 673.80 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 05 57 35 6.4 -9 673.90 -62.5 -61.5 -62.7 59 -99 SPO 1997 04 02 05 58 35 6.4 -9 673.90 -62.5 -61.5 -62.7 59 -99 SPO 1997 04 02 05 59 36 6.3 -9 673.90 -62.6 -61.5 -62.7 60 -99 SPO 1997 04 02 06 00 35 6.5 -9 673.90 -62.6 -61.5 -62.7 60 0 SPO 1997 04 02 06 01 35 6.6 -9 673.80 -62.6 -61.5 -62.7 60 -99 SPO 1997 04 02 06 02 33 6.8 -9 673.80 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 06 03 33 7.1 -9 673.80 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 06 04 32 7.1 -9 673.70 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 06 05 32 7.2 -9 673.70 -62.6 -61.4 -62.6 61 -99 SPO 1997 04 02 06 06 33 7.5 -9 673.70 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 06 07 34 7.3 -9 673.70 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 06 08 34 6.9 -9 673.70 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 06 09 34 6.5 -9 673.80 -62.7 -61.5 -62.7 61 -99 SPO 1997 04 02 06 10 34 6.3 -9 673.80 -62.7 -61.6 -62.7 60 -99 SPO 1997 04 02 06 11 33 6.5 -9 673.80 -62.6 -61.6 -62.7 59 -99 SPO 1997 04 02 06 12 33 7.0 -9 673.70 -62.5 -61.6 -62.6 58 -99 SPO 1997 04 02 06 13 33 6.9 -9 673.70 -62.5 -61.7 -62.6 58 -99 SPO 1997 04 02 06 14 32 6.9 -9 673.70 -62.5 -61.6 -62.6 59 -99 SPO 1997 04 02 06 15 33 6.5 -9 673.80 -62.5 -61.6 -62.6 59 -99 SPO 1997 04 02 06 16 32 6.2 -9 673.80 -62.5 -61.6 -62.6 60 -99 SPO 1997 04 02 06 17 33 6.0 -9 673.90 -62.5 -61.6 -62.6 60 -99 SPO 1997 04 02 06 18 33 5.3 -9 674.00 -62.4 -61.6 -62.5 59 -99 SPO 1997 04 02 06 19 33 5.3 -9 674.00 -62.4 -61.7 -62.6 59 -99 SPO 1997 04 02 06 20 35 5.5 -9 674.00 -62.4 -61.7 -62.5 57 -99 SPO 1997 04 02 06 21 36 5.7 -9 674.00 -62.4 -61.7 -62.5 57 -99 SPO 1997 04 02 06 22 36 6.0 -9 674.00 -62.4 -61.7 -62.6 58 -99 SPO 1997 04 02 06 23 36 5.8 -9 674.00 -62.5 -61.7 -62.6 59 -99 SPO 1997 04 02 06 24 35 5.7 -9 674.00 -62.5 -61.7 -62.5 59 -99 SPO 1997 04 02 06 25 35 5.7 -9 674.00 -62.5 -61.7 -62.6 59 -99 SPO 1997 04 02 06 26 33 5.6 -9 674.00 -62.5 -61.6 -62.5 60 -99 SPO 1997 04 02 06 27 34 5.8 -9 674.00 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 28 35 6.0 -9 674.00 -62.3 -61.5 -62.5 61 -99 SPO 1997 04 02 06 29 34 5.9 -9 674.00 -62.4 -61.6 -62.5 61 -99 SPO 1997 04 02 06 30 34 5.6 -9 674.10 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 31 34 5.8 -9 674.10 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 32 34 5.4 -9 674.20 -62.4 -61.5 -62.5 59 -99 SPO 1997 04 02 06 33 35 5.4 -9 674.20 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 06 34 36 5.2 -9 674.20 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 06 35 36 5.3 -9 674.20 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 06 36 35 5.5 -9 674.20 -62.3 -61.5 -62.5 57 -99 SPO 1997 04 02 06 37 34 5.6 -9 674.20 -62.4 -61.5 -62.4 58 -99 SPO 1997 04 02 06 38 33 5.8 -9 674.20 -62.4 -61.5 -62.4 59 -99 SPO 1997 04 02 06 39 34 5.9 -9 674.20 -62.3 -61.4 -62.4 59 -99 SPO 1997 04 02 06 40 34 6.0 -9 674.20 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 41 34 6.2 -9 674.20 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 42 33 6.1 -9 674.10 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 43 33 6.1 -9 674.20 -62.2 -61.4 -62.3 61 -99 SPO 1997 04 02 06 44 33 6.0 -9 674.20 -62.2 -61.3 -62.3 61 -99 SPO 1997 04 02 06 45 33 5.9 -9 674.20 -62.2 -61.3 -62.3 61 -99 SPO 1997 04 02 06 46 34 5.6 -9 674.30 -62.2 -61.3 -62.3 60 -99 SPO 1997 04 02 06 47 33 5.4 -9 674.30 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 06 48 34 5.5 -9 674.30 -62.2 -61.3 -62.3 60 -99 SPO 1997 04 02 06 49 35 5.1 -9 674.30 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 06 50 34 5.4 -9 674.30 -62.2 -61.4 -62.3 61 -99 SPO 1997 04 02 06 51 34 5.3 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 52 34 5.3 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 53 35 5.0 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 54 36 4.8 -9 674.40 -62.1 -61.6 -62.2 61 -99 SPO 1997 04 02 06 55 38 4.9 -9 674.40 -62.1 -61.5 -62.2 61 -99 SPO 1997 04 02 06 56 38 4.8 -9 674.40 -62.1 -61.5 -62.2 61 -99 SPO 1997 04 02 06 57 39 4.9 -9 674.40 -62.2 -61.6 -62.2 61 -99 SPO 1997 04 02 06 58 41 5.0 -9 674.40 -62.1 -61.5 -62.2 60 -99 SPO 1997 04 02 06 59 40 5.1 -9 674.40 -62.1 -61.5 -62.2 60 -99 SPO 1997 04 02 07 00 39 5.3 -9 674.40 -62.1 -61.5 -62.2 59 0 SPO 1997 04 02 07 01 39 5.5 -9 674.40 -62.1 -61.4 -62.2 60 -99 SPO 1997 04 02 07 02 38 5.9 -9 674.30 -62.1 -61.4 -62.2 60 -99 SPO 1997 04 02 07 03 38 5.8 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 04 36 5.8 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 05 38 5.5 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 06 39 5.2 -9 674.40 -62.2 -61.5 -62.2 60 -99 SPO 1997 04 02 07 07 40 4.9 -9 674.50 -62.2 -61.5 -62.3 60 -99 SPO 1997 04 02 07 08 41 4.6 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 09 41 4.5 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 10 40 4.5 -9 674.60 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 11 40 4.8 -9 674.50 -62.3 -61.6 -62.3 61 -99 SPO 1997 04 02 07 12 40 5.0 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 13 40 5.2 -9 674.50 -62.2 -61.5 -62.3 60 -99 SPO 1997 04 02 07 14 40 5.5 -9 674.40 -62.2 -61.5 -62.4 60 -99 SPO 1997 04 02 07 15 39 5.7 -9 674.40 -62.3 -61.5 -62.4 61 -99 SPO 1997 04 02 07 16 38 5.7 -9 674.40 -62.3 -61.5 -62.4 59 -99 SPO 1997 04 02 07 17 39 5.6 -9 674.40 -62.4 -61.5 -62.5 59 -99 SPO 1997 04 02 07 18 39 5.5 -9 674.40 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 07 19 39 5.5 -9 674.40 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 20 40 5.3 -9 674.50 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 21 39 5.3 -9 674.50 -62.4 -61.5 -62.6 57 -99 SPO 1997 04 02 07 22 39 5.2 -9 674.50 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 23 39 4.9 -9 674.60 -62.6 -61.5 -62.6 57 -99 SPO 1997 04 02 07 24 39 4.7 -9 674.60 -62.6 -61.6 -62.6 57 -99 SPO 1997 04 02 07 25 40 4.5 -9 674.70 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 26 41 4.5 -9 674.70 -62.6 -61.7 -62.7 58 -99 SPO 1997 04 02 07 27 41 4.6 -9 674.70 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 28 40 4.8 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 29 39 5.3 -9 674.60 -62.7 -61.7 -62.8 58 -99 SPO 1997 04 02 07 30 38 5.5 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 31 37 5.6 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 32 36 5.8 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 33 36 5.9 -9 674.40 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 34 35 5.9 -9 674.50 -62.7 -61.5 -62.8 56 -99 SPO 1997 04 02 07 35 34 5.9 -9 674.40 -62.7 -61.5 -62.8 56 -99 SPO 1997 04 02 07 36 34 5.9 -9 674.40 -62.7 -61.5 -62.8 57 -99 SPO 1997 04 02 07 37 34 5.8 -9 674.50 -62.7 -61.5 -62.8 57 -99 SPO 1997 04 02 07 38 35 5.8 -9 674.50 -62.8 -61.5 -62.7 59 -99 SPO 1997 04 02 07 39 35 5.6 -9 674.50 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 07 40 37 5.3 -9 674.50 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 07 41 37 5.2 -9 674.60 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 07 42 37 5.0 -9 674.60 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 07 43 38 4.7 -9 674.60 -62.7 -61.6 -62.7 58 -99 SPO 1997 04 02 07 44 39 4.7 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 45 40 4.8 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 46 42 4.7 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 47 42 4.8 -9 674.70 -62.7 -61.6 -62.7 57 -99 SPO 1997 04 02 07 48 42 4.8 -9 674.60 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 07 49 40 5.1 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 50 39 5.1 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 51 38 4.9 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 52 37 5.0 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 53 36 5.1 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 54 35 5.2 -9 674.60 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 55 34 5.3 -9 674.60 -62.5 -61.6 -62.6 57 -99 SPO 1997 04 02 07 56 35 5.3 -9 674.60 -62.5 -61.5 -62.6 57 -99 SPO 1997 04 02 07 57 35 5.3 -9 674.60 -62.5 -61.5 -62.6 57 -99 SPO 1997 04 02 07 58 35 5.5 -9 674.60 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 59 35 5.4 -9 674.60 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 08 00 35 5.6 -9 674.60 -62.3 -61.5 -62.4 58 0 SPO 1997 04 02 08 01 35 5.6 -9 674.60 -62.3 -61.5 -62.4 61 -99 SPO 1997 04 02 08 02 35 5.6 -9 674.60 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 08 03 35 5.7 -9 674.60 -62.2 -61.4 -62.2 61 -99 SPO 1997 04 02 08 04 35 5.9 -9 674.60 -62.1 -61.4 -62.2 61 -99 SPO 1997 04 02 08 05 34 6.1 -9 674.60 -62.1 -61.4 -62.2 61 -99 SPO 1997 04 02 08 06 34 6.2 -9 674.60 -62.1 -61.4 -62.1 61 -99 SPO 1997 04 02 08 07 33 6.1 -9 674.60 -62.0 -61.4 -62.1 61 -99 SPO 1997 04 02 08 08 32 6.5 -9 674.60 -62.0 -61.4 -62.0 61 -99 SPO 1997 04 02 08 09 33 6.6 -9 674.50 -61.9 -61.4 -62.0 60 -99 SPO 1997 04 02 08 10 32 6.5 -9 674.50 -61.9 -61.3 -62.0 60 -99 SPO 1997 04 02 08 11 33 6.5 -9 674.50 -61.8 -61.3 -61.9 60 -99 SPO 1997 04 02 08 12 33 6.6 -9 674.50 -61.8 -61.3 -61.9 61 -99 SPO 1997 04 02 08 13 33 6.3 -9 674.60 -61.8 -61.3 -61.8 62 -99 SPO 1997 04 02 08 14 34 6.5 -9 674.50 -61.7 -61.3 -61.8 62 -99 SPO 1997 04 02 08 15 34 6.5 -9 674.50 -61.7 -61.3 -61.8 62 -99 SPO 1997 04 02 08 16 33 6.7 -9 674.60 -61.6 -61.2 -61.8 62 -99 SPO 1997 04 02 08 17 32 6.6 -9 674.60 -61.6 -61.2 -61.7 62 -99 SPO 1997 04 02 08 18 32 6.6 -9 674.60 -61.6 -61.2 -61.7 61 -99 SPO 1997 04 02 08 19 31 6.7 -9 674.50 -61.6 -61.2 -61.6 61 -99 SPO 1997 04 02 08 20 32 6.8 -9 674.50 -61.5 -61.2 -61.6 60 -99 SPO 1997 04 02 08 21 31 6.5 -9 674.60 -61.5 -61.3 -61.6 61 -99 SPO 1997 04 02 08 22 31 6.5 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 23 32 6.5 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 24 32 6.6 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 25 32 6.3 -9 674.60 -61.5 -61.1 -61.6 63 -99 SPO 1997 04 02 08 26 33 6.5 -9 674.60 -61.4 -61.1 -61.5 62 -99 SPO 1997 04 02 08 27 31 6.5 -9 674.60 -61.4 -61.0 -61.5 62 -99 SPO 1997 04 02 08 28 31 6.5 -9 674.70 -61.4 -61.0 -61.5 63 -99 SPO 1997 04 02 08 29 31 6.6 -9 674.60 -61.4 -61.0 -61.5 63 -99 SPO 1997 04 02 08 30 31 6.6 -9 674.60 -61.3 -61.0 -61.4 62 -99 SPO 1997 04 02 08 31 30 6.9 -9 674.60 -61.3 -60.9 -61.4 62 -99 SPO 1997 04 02 08 32 31 7.1 -9 674.60 -61.3 -60.8 -61.4 61 -99 SPO 1997 04 02 08 33 31 6.9 -9 674.60 -61.2 -60.8 -61.3 60 -99 SPO 1997 04 02 08 34 32 7.2 -9 674.60 -61.3 -60.8 -61.3 61 -99 SPO 1997 04 02 08 35 30 7.2 -9 674.60 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 08 36 31 7.3 -9 674.60 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 08 37 28 7.2 -9 674.60 -61.2 -60.7 -61.3 61 -99 SPO 1997 04 02 08 38 29 7.0 -9 674.60 -61.2 -60.8 -61.3 62 -99 SPO 1997 04 02 08 39 28 7.0 -9 674.60 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 40 28 7.0 -9 674.70 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 41 27 7.2 -9 674.70 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 42 26 7.0 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 43 26 7.1 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 44 26 7.2 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 45 26 6.9 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 46 26 6.9 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 47 25 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 48 24 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 49 23 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 50 23 6.8 -9 674.70 -61.2 -61.0 -61.3 61 -99 SPO 1997 04 02 08 51 23 6.8 -9 674.70 -61.3 -60.9 -61.3 62 -99 SPO 1997 04 02 08 52 22 6.9 -9 674.70 -61.3 -60.9 -61.3 62 -99 SPO 1997 04 02 08 53 22 6.8 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 54 22 6.4 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 55 22 6.5 -9 674.80 -61.3 -60.9 -61.3 61 -99 SPO 1997 04 02 08 56 23 6.6 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 57 23 6.6 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 58 23 6.7 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 59 22 6.7 -9 674.80 -61.3 -60.8 -61.4 61 -99 SPO 1997 04 02 09 00 23 6.4 -9 674.80 -61.2 -60.8 -61.3 61 0 SPO 1997 04 02 09 01 22 6.7 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 02 23 6.5 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 03 23 6.5 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 04 22 6.7 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 05 23 6.5 -9 674.90 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 09 06 22 6.6 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 07 22 6.6 -9 674.90 -61.2 -60.8 -61.2 61 -99 SPO 1997 04 02 09 08 23 6.7 -9 674.90 -61.2 -60.8 -61.2 62 -99 SPO 1997 04 02 09 09 24 6.7 -9 674.90 -61.1 -60.8 -61.2 61 -99 SPO 1997 04 02 09 10 23 6.6 -9 674.90 -61.1 -60.8 -61.2 60 -99 SPO 1997 04 02 09 11 24 6.6 -9 674.90 -61.1 -60.8 -61.2 61 -99 SPO 1997 04 02 09 12 24 6.5 -9 674.90 -61.1 -60.8 -61.2 62 -99 SPO 1997 04 02 09 13 24 6.4 -9 674.90 -61.0 -60.7 -61.1 61 -99 SPO 1997 04 02 09 14 25 6.3 -9 674.90 -61.0 -60.7 -61.1 62 -99 SPO 1997 04 02 09 15 24 6.7 -9 674.90 -61.0 -60.7 -61.1 62 -99 SPO 1997 04 02 09 16 25 6.5 -9 674.90 -61.0 -60.7 -61.0 62 -99 SPO 1997 04 02 09 17 25 6.3 -9 674.90 -61.0 -60.7 -61.0 61 -99 SPO 1997 04 02 09 18 25 6.2 -9 674.90 -60.9 -60.7 -61.0 60 -99 SPO 1997 04 02 09 19 24 6.2 -9 674.90 -60.9 -60.8 -61.0 60 -99 SPO 1997 04 02 09 20 23 6.2 -9 674.90 -60.9 -60.8 -61.0 59 -99 SPO 1997 04 02 09 21 24 6.2 -9 674.90 -60.9 -60.8 -61.0 59 -99 SPO 1997 04 02 09 22 24 6.2 -9 674.90 -60.9 -60.8 -61.0 60 -99 SPO 1997 04 02 09 23 24 6.1 -9 674.90 -60.8 -60.8 -60.9 61 -99 SPO 1997 04 02 09 24 25 6.1 -9 674.90 -60.8 -60.7 -60.9 62 -99 SPO 1997 04 02 09 25 25 5.9 -9 674.90 -60.8 -60.7 -60.9 62 -99 SPO 1997 04 02 09 26 24 6.4 -9 674.90 -60.8 -60.7 -60.8 63 -99 SPO 1997 04 02 09 27 25 6.2 -9 674.90 -60.7 -60.6 -60.8 62 -99 SPO 1997 04 02 09 28 25 6.4 -9 674.90 -60.7 -60.6 -60.7 62 -99 SPO 1997 04 02 09 29 26 6.3 -9 674.90 -60.6 -60.6 -60.7 62 -99 SPO 1997 04 02 09 30 26 6.4 -9 674.90 -60.6 -60.6 -60.7 62 -99 SPO 1997 04 02 09 31 26 6.2 -9 674.90 -60.6 -60.6 -60.7 61 -99 SPO 1997 04 02 09 32 27 6.3 -9 674.90 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 02 09 33 26 6.2 -9 674.90 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 02 09 34 26 6.3 -9 674.90 -60.6 -60.6 -60.6 61 -99 SPO 1997 04 02 09 35 25 6.2 -9 674.90 -60.5 -60.6 -60.6 61 -99 SPO 1997 04 02 09 36 25 6.3 -9 675.00 -60.5 -60.5 -60.6 62 -99 SPO 1997 04 02 09 37 25 6.5 -9 675.00 -60.5 -60.5 -60.5 63 -99 SPO 1997 04 02 09 38 25 6.2 -9 675.00 -60.5 -60.6 -60.5 63 -99 SPO 1997 04 02 09 39 25 5.9 -9 675.10 -60.5 -60.6 -60.5 63 -99 SPO 1997 04 02 09 40 24 5.7 -9 675.10 -60.4 -60.6 -60.5 63 -99 SPO 1997 04 02 09 41 25 5.7 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 42 26 5.7 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 43 26 5.9 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 44 26 5.8 -9 675.20 -60.4 -60.5 -60.4 62 -99 SPO 1997 04 02 09 45 25 5.9 -9 675.20 -60.3 -60.5 -60.4 61 -99 SPO 1997 04 02 09 46 25 5.8 -9 675.20 -60.3 -60.4 -60.4 61 -99 SPO 1997 04 02 09 47 24 5.7 -9 675.20 -60.3 -60.4 -60.4 60 -99 SPO 1997 04 02 09 48 22 6.0 -9 675.20 -60.3 -60.4 -60.4 61 -99 SPO 1997 04 02 09 49 24 5.6 -9 675.20 -60.2 -60.3 -60.3 61 -99 SPO 1997 04 02 09 50 23 5.7 -9 675.20 -60.2 -60.4 -60.3 62 -99 SPO 1997 04 02 09 51 23 5.7 -9 675.20 -60.2 -60.4 -60.3 63 -99 SPO 1997 04 02 09 52 24 5.9 -9 675.20 -60.2 -60.4 -60.3 63 -99 SPO 1997 04 02 09 53 24 5.8 -9 675.20 -60.2 -60.4 -60.2 62 -99 SPO 1997 04 02 09 54 23 5.8 -9 675.20 -60.2 -60.3 -60.2 61 -99 SPO 1997 04 02 09 55 21 5.7 -9 675.30 -60.1 -60.3 -60.2 60 -99 SPO 1997 04 02 09 56 20 5.7 -9 675.30 -60.1 -60.2 -60.2 60 -99 SPO 1997 04 02 09 57 21 5.7 -9 675.30 -60.0 -60.2 -60.1 60 -99 SPO 1997 04 02 09 58 19 6.2 -9 675.30 -60.0 -60.2 -60.1 60 -99 SPO 1997 04 02 09 59 19 5.9 -9 675.30 -60.0 -60.1 -60.1 61 -99 SPO 1997 04 02 10 00 19 5.7 -9 675.40 -60.0 -60.1 -60.1 61 0 SPO 1997 04 02 10 01 19 6.1 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 02 19 5.8 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 03 19 5.6 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 04 18 6.0 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 05 19 5.8 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 06 19 5.9 -9 675.30 -59.9 -60.1 -59.9 61 -99 SPO 1997 04 02 10 07 18 6.2 -9 675.30 -59.8 -60.1 -59.9 60 -99 SPO 1997 04 02 10 08 18 6.4 -9 675.40 -59.8 -60.1 -59.9 60 -99 SPO 1997 04 02 10 09 18 6.1 -9 675.40 -59.8 -60.0 -59.9 61 -99 SPO 1997 04 02 10 10 20 5.7 -9 675.40 -59.8 -60.0 -59.9 62 -99 SPO 1997 04 02 10 11 18 6.1 -9 675.40 -59.8 -60.0 -59.8 63 -99 SPO 1997 04 02 10 12 18 5.8 -9 675.40 -59.8 -60.0 -59.8 63 -99 SPO 1997 04 02 10 13 16 6.2 -9 675.30 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 14 17 6.2 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 15 18 6.3 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 16 18 6.1 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 17 20 6.3 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 18 21 6.1 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 19 21 6.0 -9 675.40 -59.7 -60.0 -59.8 60 -99 SPO 1997 04 02 10 20 22 6.1 -9 675.40 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 21 21 6.0 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 22 22 6.4 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 23 23 6.2 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 24 23 6.3 -9 675.40 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 25 23 6.3 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 26 24 6.4 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 27 24 6.1 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 28 23 6.3 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 29 24 5.9 -9 675.40 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 30 25 6.0 -9 675.40 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 31 26 5.9 -9 675.50 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 32 25 6.2 -9 675.50 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 33 24 6.0 -9 675.50 -59.7 -59.9 -59.7 60 -99 SPO 1997 04 02 10 34 25 6.2 -9 675.50 -59.6 -59.8 -59.7 60 -99 SPO 1997 04 02 10 35 23 6.5 -9 675.50 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 36 23 6.5 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 37 23 6.2 -9 675.40 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 38 24 5.8 -9 675.40 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 39 23 6.7 -9 675.50 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 40 22 5.9 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 41 23 6.1 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 42 24 6.5 -9 675.50 -59.6 -59.8 -59.7 60 -99 SPO 1997 04 02 10 43 22 6.4 -9 675.50 -59.6 -59.8 -59.6 60 -99 SPO 1997 04 02 10 44 23 6.1 -9 675.50 -59.5 -59.8 -59.6 59 -99 SPO 1997 04 02 10 45 22 6.3 -9 675.50 -59.5 -59.8 -59.6 60 -99 SPO 1997 04 02 10 46 22 6.0 -9 675.50 -59.5 -59.7 -59.6 61 -99 SPO 1997 04 02 10 47 20 6.7 -9 675.50 -59.5 -59.7 -59.6 61 -99 SPO 1997 04 02 10 48 22 5.9 -9 675.50 -59.5 -59.6 -59.5 61 -99 SPO 1997 04 02 10 49 22 6.1 -9 675.50 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 50 21 6.3 -9 675.50 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 51 23 6.2 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 52 22 6.1 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 53 20 6.1 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 54 20 6.2 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 55 19 6.5 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 56 20 6.5 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 57 19 6.0 -9 675.50 -59.4 -59.7 -59.5 61 -99 SPO 1997 04 02 10 58 20 6.4 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 59 20 6.0 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 11 00 20 5.6 -9 675.60 -59.4 -59.6 -59.5 61 0 SPO 1997 04 02 11 01 20 5.8 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 11 02 20 5.8 -9 675.60 -59.4 -59.6 -59.4 61 -99 SPO 1997 04 02 11 03 19 6.1 -9 675.60 -59.4 -59.6 -59.4 61 -99 SPO 1997 04 02 11 04 18 6.2 -9 675.60 -59.4 -59.5 -59.4 61 -99 SPO 1997 04 02 11 05 18 6.6 -9 675.60 -59.4 -59.5 -59.4 59 -99 SPO 1997 04 02 11 06 19 6.2 -9 675.60 -59.3 -59.6 -59.4 59 -99 SPO 1997 04 02 11 07 20 6.3 -9 675.60 -59.3 -59.6 -59.4 59 -99 SPO 1997 04 02 11 08 19 6.3 -9 675.60 -59.3 -59.6 -59.4 60 -99 SPO 1997 04 02 11 09 19 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 10 19 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 11 19 6.1 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 12 20 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 13 19 6.1 -9 675.60 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 14 20 6.3 -9 675.70 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 15 23 5.7 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 16 24 5.9 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 17 23 6.3 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 18 24 5.7 -9 675.70 -59.3 -59.4 -59.3 60 -99 SPO 1997 04 02 11 19 24 6.1 -9 675.80 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 20 25 6.0 -9 675.80 -59.3 -59.4 -59.3 61 -99 SPO 1997 04 02 11 21 24 6.1 -9 675.80 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 22 25 6.1 -9 675.80 -59.2 -59.5 -59.4 61 -99 SPO 1997 04 02 11 23 26 5.7 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 24 26 5.8 -9 675.80 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 25 25 5.9 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 26 24 5.8 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 27 24 5.9 -9 675.80 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 28 24 5.3 -9 675.80 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 29 24 5.6 -9 675.80 -59.2 -59.5 -59.4 59 -99 SPO 1997 04 02 11 30 25 5.7 -9 675.80 -59.3 -59.4 -59.4 60 -99 SPO 1997 04 02 11 31 24 5.9 -9 675.80 -59.3 -59.4 -59.4 60 -99 SPO 1997 04 02 11 32 24 5.6 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 33 26 5.6 -9 675.80 -59.3 -59.4 -59.3 61 -99 SPO 1997 04 02 11 34 26 5.4 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 35 24 5.4 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 36 23 5.7 -9 675.90 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 37 23 5.4 -9 675.90 -59.2 -59.5 -59.3 60 -99 SPO 1997 04 02 11 38 23 5.4 -9 675.90 -59.2 -59.5 -59.3 60 -99 SPO 1997 04 02 11 39 24 5.3 -9 675.90 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 40 23 5.2 -9 675.90 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 41 22 5.5 -9 676.00 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 42 23 5.3 -9 676.00 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 43 25 5.3 -9 676.00 -59.2 -59.5 -59.3 62 -99 SPO 1997 04 02 11 44 26 5.0 -9 676.10 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 02 11 45 25 5.2 -9 676.00 -59.2 -59.4 -59.3 62 -99 SPO 1997 04 02 11 46 26 5.3 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 47 27 4.9 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 48 27 5.6 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 49 25 5.3 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 50 26 5.0 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 51 27 5.2 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 52 26 5.5 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 53 26 5.1 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 54 24 5.3 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 55 23 5.3 -9 676.20 -59.1 -59.4 -59.1 62 -99 SPO 1997 04 02 11 56 23 5.1 -9 676.20 -59.1 -59.4 -59.2 62 -99 SPO 1997 04 02 11 57 24 5.0 -9 676.20 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 11 58 25 5.1 -9 676.20 -59.0 -59.3 -59.2 61 -99 SPO 1997 04 02 11 59 24 5.0 -9 676.20 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 00 25 5.1 -9 676.20 -59.0 -59.3 -59.1 61 0 SPO 1997 04 02 12 01 26 5.4 -9 676.30 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 02 27 5.1 -9 676.30 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 03 27 5.1 -9 676.20 -59.0 -59.2 -59.1 60 -99 SPO 1997 04 02 12 04 27 5.3 -9 676.30 -59.0 -59.2 -59.1 60 -99 SPO 1997 04 02 12 05 27 5.4 -9 676.30 -59.0 -59.2 -59.0 61 -99 SPO 1997 04 02 12 06 26 5.0 -9 676.30 -58.9 -59.2 -59.0 60 -99 SPO 1997 04 02 12 07 26 5.4 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 08 26 5.3 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 09 28 5.3 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 10 31 5.4 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 11 29 5.5 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 12 29 5.7 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 13 31 5.4 -9 676.40 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 14 31 5.7 -9 676.30 -58.9 -59.2 -59.0 62 -99 SPO 1997 04 02 12 15 29 5.7 -9 676.30 -58.9 -59.2 -59.0 62 -99 SPO 1997 04 02 12 16 28 5.9 -9 676.30 -58.9 -59.2 -59.0 63 -99 SPO 1997 04 02 12 17 27 5.5 -9 676.30 -58.9 -59.2 -59.0 63 -99 SPO 1997 04 02 12 18 26 5.8 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 19 25 5.7 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 20 25 6.2 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 21 24 5.5 -9 676.40 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 22 25 5.8 -9 676.40 -58.9 -59.1 -58.9 63 -99 SPO 1997 04 02 12 23 24 5.9 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 24 24 5.6 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 25 22 5.8 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 26 22 5.9 -9 676.30 -58.8 -59.2 -58.9 61 -99 SPO 1997 04 02 12 27 22 5.8 -9 676.40 -58.8 -59.2 -58.9 61 -99 SPO 1997 04 02 12 28 21 5.5 -9 676.40 -58.8 -59.1 -58.9 62 -99 SPO 1997 04 02 12 29 20 5.8 -9 676.30 -58.8 -59.1 -58.9 62 -99 SPO 1997 04 02 12 30 20 5.7 -9 676.30 -58.8 -59.1 -58.9 63 -99 SPO 1997 04 02 12 31 21 5.8 -9 676.30 -58.8 -59.1 -58.9 64 -99 SPO 1997 04 02 12 32 22 6.1 -9 676.30 -58.8 -59.1 -58.9 64 -99 SPO 1997 04 02 12 33 20 5.8 -9 676.30 -58.8 -59.1 -58.9 63 -99 SPO 1997 04 02 12 34 20 5.7 -9 676.30 -58.8 -59.1 -58.8 63 -99 SPO 1997 04 02 12 35 19 5.7 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 36 20 6.0 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 37 19 5.9 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 38 18 6.0 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 39 19 6.1 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 40 16 5.8 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 41 15 6.1 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 42 16 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 43 14 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 44 14 6.8 -9 676.30 -58.7 -59.1 -58.8 64 -99 SPO 1997 04 02 12 45 15 6.8 -9 676.30 -58.7 -59.1 -58.8 64 -99 SPO 1997 04 02 12 46 14 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 47 13 6.8 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 48 13 6.4 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 49 14 6.7 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 50 13 6.7 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 51 13 6.9 -9 676.30 -58.6 -59.0 -58.8 62 -99 SPO 1997 04 02 12 52 12 7.2 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 53 13 6.6 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 54 11 6.7 -9 676.40 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 55 13 7.1 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 56 13 6.8 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 57 14 7.0 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 12 58 14 6.2 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 12 59 14 6.7 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 13 00 14 6.6 -9 676.40 -58.7 -59.0 -58.8 61 0 SPO 1997 04 02 13 01 13 6.7 -9 676.40 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 02 13 6.9 -9 676.40 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 03 13 6.8 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 04 13 6.4 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 05 12 6.9 -9 676.40 -58.7 -59.1 -58.8 62 -99 SPO 1997 04 02 13 06 12 7.0 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 07 14 6.5 -9 676.50 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 13 08 15 6.9 -9 676.50 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 09 16 6.7 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 10 15 6.6 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 11 18 6.5 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 12 18 6.7 -9 676.50 -58.7 -58.9 -58.8 60 -99 SPO 1997 04 02 13 13 18 6.7 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 14 18 6.6 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 15 18 6.5 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 16 18 7.0 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 17 18 6.8 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 18 17 6.7 -9 676.50 -58.7 -59.0 -58.7 61 -99 SPO 1997 04 02 13 19 18 7.0 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 20 18 6.8 -9 676.50 -58.6 -59.0 -58.8 61 -99 SPO 1997 04 02 13 21 17 6.9 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 22 17 6.9 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 23 15 7.3 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 24 17 7.0 -9 676.50 -58.7 -58.9 -58.8 60 -99 SPO 1997 04 02 13 25 16 6.8 -9 676.50 -58.6 -58.9 -58.7 60 -99 SPO 1997 04 02 13 26 16 6.6 -9 676.50 -58.7 -58.9 -58.7 61 -99 SPO 1997 04 02 13 27 17 6.9 -9 676.60 -58.7 -58.9 -58.8 61 -99 SPO 1997 04 02 13 28 17 7.1 -9 676.60 -58.6 -58.9 -58.8 60 -99 SPO 1997 04 02 13 29 15 7.1 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 30 16 6.3 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 31 15 6.8 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 32 15 6.9 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 33 16 6.7 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 34 16 6.7 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 35 16 7.0 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 36 16 6.6 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 37 16 6.5 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 38 16 6.6 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 39 15 6.5 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 40 15 7.1 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 41 15 7.2 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 42 16 6.9 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 43 16 7.0 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 44 17 7.3 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 45 17 6.8 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 46 15 7.2 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 47 16 7.5 -9 676.60 -58.6 -59.0 -58.7 59 -99 SPO 1997 04 02 13 48 16 6.7 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 49 15 7.2 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 50 15 7.5 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 51 15 7.1 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 52 16 7.3 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 53 17 7.2 -9 676.70 -58.6 -58.9 -58.6 62 -99 SPO 1997 04 02 13 54 17 7.3 -9 676.70 -58.6 -58.8 -58.6 62 -99 SPO 1997 04 02 13 55 17 7.1 -9 676.70 -58.6 -58.8 -58.6 62 -99 SPO 1997 04 02 13 56 18 7.0 -9 676.70 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 13 57 17 7.1 -9 676.70 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 13 58 19 6.9 -9 676.70 -58.5 -58.8 -58.6 60 -99 SPO 1997 04 02 13 59 18 7.0 -9 676.70 -58.5 -58.8 -58.6 60 -99 SPO 1997 04 02 14 00 19 7.0 -9 676.80 -58.5 -58.8 -58.6 60 0 SPO 1997 04 02 14 01 18 7.2 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 02 19 7.1 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 03 18 6.8 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 04 19 6.7 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 05 18 7.2 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 06 18 7.1 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 07 17 7.0 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 08 17 7.0 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 09 16 7.1 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 10 17 7.0 -9 676.80 -58.5 -58.8 -58.5 60 -99 SPO 1997 04 02 14 11 16 7.0 -9 676.90 -58.5 -58.7 -58.5 61 -99 SPO 1997 04 02 14 12 16 6.1 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 13 16 6.6 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 14 16 6.3 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 15 16 6.4 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 16 16 6.9 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 17 17 6.2 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 18 18 6.6 -9 676.90 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 19 17 6.6 -9 676.90 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 20 17 6.2 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 21 16 6.6 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 22 17 5.9 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 23 17 5.9 -9 677.00 -58.4 -58.7 -58.4 61 -99 SPO 1997 04 02 14 24 18 5.6 -9 677.10 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 25 18 5.8 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 26 18 5.8 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 27 17 5.5 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 28 16 5.6 -9 677.20 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 29 16 5.4 -9 677.10 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 30 16 5.6 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 31 16 5.8 -9 677.20 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 32 16 5.8 -9 677.10 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 33 17 5.5 -9 677.20 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 34 16 5.8 -9 677.10 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 35 17 5.7 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 36 17 5.2 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 37 18 5.8 -9 677.20 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 38 18 5.4 -9 677.20 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 39 18 5.0 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 40 18 4.9 -9 677.30 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 14 41 18 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 42 17 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 43 16 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 44 18 4.8 -9 677.30 -58.2 -58.5 -58.4 59 -99 SPO 1997 04 02 14 45 17 5.0 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 46 16 4.9 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 47 17 5.1 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 48 15 5.0 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 49 15 5.0 -9 677.30 -58.3 -58.6 -58.3 61 -99 SPO 1997 04 02 14 50 17 5.1 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 51 18 5.1 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 52 18 5.1 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 53 16 5.3 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 54 17 5.0 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 55 16 4.6 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 56 17 4.2 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 57 17 4.6 -9 677.40 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 58 16 5.0 -9 677.40 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 59 17 4.7 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 00 19 4.5 -9 677.40 -58.3 -58.5 -58.4 62 0 SPO 1997 04 02 15 01 18 4.7 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 02 19 5.0 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 03 19 5.0 -9 677.40 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 15 04 19 5.0 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 05 19 5.3 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 06 18 5.3 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 07 17 5.0 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 08 18 4.9 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 09 19 5.1 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 15 10 19 4.9 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 15 11 20 4.9 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 12 21 4.9 -9 677.40 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 13 21 4.8 -9 677.40 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 14 23 5.0 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 15 24 5.0 -9 677.40 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 15 16 24 5.0 -9 677.40 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 17 25 4.9 -9 677.40 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 18 25 5.0 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 19 25 5.1 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 20 28 4.9 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 21 29 5.1 -9 677.40 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 22 28 5.0 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 23 29 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 24 31 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 25 31 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 26 30 5.0 -9 677.50 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 27 28 5.1 -9 677.50 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 28 27 4.9 -9 677.50 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 29 30 4.5 -9 677.60 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 30 31 5.0 -9 677.60 -58.2 -58.4 -58.3 59 -99 SPO 1997 04 02 15 31 27 5.1 -9 677.50 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 32 29 5.1 -9 677.50 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 33 30 4.7 -9 677.60 -58.2 -58.4 -58.3 61 -99 SPO 1997 04 02 15 34 30 5.0 -9 677.60 -58.2 -58.4 -58.3 61 -99 SPO 1997 04 02 15 35 31 4.9 -9 677.60 -58.1 -58.4 -58.3 60 -99 SPO 1997 04 02 15 36 32 4.8 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 37 31 4.8 -9 677.60 -58.1 -58.5 -58.2 60 -99 SPO 1997 04 02 15 38 31 5.0 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 39 30 5.0 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 40 30 5.0 -9 677.60 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 41 30 5.0 -9 677.60 -58.2 -58.5 -58.2 62 -99 SPO 1997 04 02 15 42 30 5.1 -9 677.60 -58.1 -58.5 -58.2 61 -99 SPO 1997 04 02 15 43 30 4.9 -9 677.60 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 44 32 4.5 -9 677.70 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 45 30 4.7 -9 677.70 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 46 31 4.5 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 47 32 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 48 33 4.5 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 49 33 4.5 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 50 33 4.5 -9 677.80 -58.1 -58.4 -58.2 60 -99 SPO 1997 04 02 15 51 34 4.4 -9 677.80 -58.1 -58.4 -58.2 59 -99 SPO 1997 04 02 15 52 32 4.4 -9 677.80 -58.1 -58.4 -58.2 59 -99 SPO 1997 04 02 15 53 30 4.0 -9 677.80 -58.1 -58.4 -58.2 60 -99 SPO 1997 04 02 15 54 30 4.4 -9 677.80 -58.1 -58.4 -58.1 61 -99 SPO 1997 04 02 15 55 34 4.3 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 56 36 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 57 34 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 58 33 4.6 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 59 32 5.1 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 00 32 5.0 -9 677.80 -58.1 -58.4 -58.2 62 0 SPO 1997 04 02 16 01 32 5.2 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 02 31 5.0 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 03 31 5.2 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 04 32 5.1 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 05 31 5.2 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 06 32 5.0 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 07 32 5.2 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 08 32 5.0 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 09 31 5.3 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 10 30 5.2 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 11 29 5.1 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 12 30 5.3 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 13 32 5.0 -9 678.00 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 14 31 4.9 -9 678.00 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 15 33 5.2 -9 678.00 -58.1 -58.3 -58.1 61 -99 SPO 1997 04 02 16 16 33 4.9 -9 678.00 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 17 33 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 18 34 5.0 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 19 34 5.0 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 20 34 4.6 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 21 33 4.7 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 22 33 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 23 33 5.1 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 24 32 5.2 -9 678.00 -58.0 -58.3 -58.1 60 -99 SPO 1997 04 02 16 25 33 5.0 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 26 34 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 27 34 5.2 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 28 32 5.4 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 29 31 5.2 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 30 32 5.1 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 31 34 4.7 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 32 35 4.8 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 33 35 5.0 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 34 35 4.9 -9 678.10 -58.0 -58.2 -58.1 61 -99 SPO 1997 04 02 16 35 35 4.7 -9 678.10 -58.0 -58.2 -58.0 61 -99 SPO 1997 04 02 16 36 34 4.9 -9 678.20 -58.0 -58.2 -58.0 60 -99 SPO 1997 04 02 16 37 35 4.7 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 38 36 4.8 -9 678.20 -57.9 -58.1 -58.0 59 -99 SPO 1997 04 02 16 39 35 4.5 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 40 36 4.5 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 41 36 4.6 -9 678.20 -57.9 -58.2 -58.0 60 -99 SPO 1997 04 02 16 42 34 5.0 -9 678.20 -57.9 -58.2 -58.0 61 -99 SPO 1997 04 02 16 43 32 5.0 -9 678.20 -57.9 -58.2 -58.0 61 -99 SPO 1997 04 02 16 44 31 4.9 -9 678.20 -57.9 -58.1 -58.0 62 -99 SPO 1997 04 02 16 45 32 4.9 -9 678.20 -57.9 -58.2 -58.0 62 -99 SPO 1997 04 02 16 46 34 4.9 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 47 34 4.7 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 48 35 4.7 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 49 34 4.9 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 50 34 4.4 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 51 34 4.4 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 52 34 4.4 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 53 32 4.8 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 54 33 4.7 -9 678.20 -57.8 -58.0 -57.9 61 -99 SPO 1997 04 02 16 55 32 4.3 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 56 33 4.9 -9 678.20 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 16 57 34 4.5 -9 678.20 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 16 58 34 4.5 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 59 34 4.5 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 00 34 4.2 -9 678.30 -57.8 -58.1 -57.9 60 0 SPO 1997 04 02 17 01 32 4.7 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 02 32 4.9 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 03 33 4.3 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 04 33 4.6 -9 678.30 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 17 05 34 4.8 -9 678.30 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 17 06 34 4.6 -9 678.30 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 17 07 34 4.4 -9 678.30 -57.8 -58.0 -57.9 63 -99 SPO 1997 04 02 17 08 36 4.2 -9 678.30 -57.8 -58.0 -57.9 62 -99 SPO 1997 04 02 17 09 37 4.4 -9 678.40 -57.8 -58.0 -57.9 62 -99 SPO 1997 04 02 17 10 37 4.5 -9 678.40 -57.8 -58.0 -57.8 61 -99 SPO 1997 04 02 17 11 36 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 12 37 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 13 36 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 14 37 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 15 37 4.5 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 16 37 4.6 -9 678.50 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 17 37 4.7 -9 678.40 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 18 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 19 37 4.5 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 20 34 4.8 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 21 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 22 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 23 35 4.5 -9 678.50 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 24 34 4.7 -9 678.50 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 25 34 4.5 -9 678.50 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 26 35 4.7 -9 678.50 -57.7 -57.9 -57.8 -99 -99 SPO 1997 04 02 17 27 36 4.7 -9 678.50 -57.7 -57.9 -57.8 -99 -99 SPO 1997 04 02 17 28 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 29 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 30 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 31 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 32 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 33 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 34 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 35 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 36 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 37 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 40 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 41 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 42 34 4.3 -9 678.60 -57.6 -57.8 -57.7 -99 -99 SPO 1997 04 02 17 43 32 4.6 -9 678.60 -57.6 -57.9 -57.7 -99 -99 SPO 1997 04 02 17 44 33 4.6 -9 678.60 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 45 32 4.7 -9 678.60 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 46 32 4.8 -9 678.60 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 47 32 4.5 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 48 33 4.6 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 49 33 4.9 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 50 33 4.5 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 51 34 4.9 -9 678.70 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 52 35 4.9 -9 678.70 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 53 35 4.5 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 54 37 4.6 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 55 36 4.8 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 56 36 4.7 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 57 35 4.9 -9 678.80 -57.6 -57.8 -57.7 62 -99 SPO 1997 04 02 17 58 36 5.1 -9 678.80 -57.6 -57.8 -57.7 60 -99 SPO 1997 04 02 17 59 35 5.0 -9 678.80 -57.6 -57.8 -57.7 59 -99 SPO 1997 04 02 18 00 34 5.2 -9 678.80 -57.6 -57.9 -57.7 60 0 SPO 1997 04 02 18 01 36 5.0 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 02 36 5.0 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 03 35 5.0 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 04 35 5.5 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 05 37 5.3 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 06 36 5.4 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 07 36 5.0 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 08 36 5.4 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 09 35 5.3 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 10 36 5.4 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 11 37 5.2 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 12 37 5.2 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 13 37 4.8 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 14 38 5.2 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 15 38 4.8 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 16 38 4.8 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 17 37 4.8 -9 678.90 -57.6 -58.0 -57.7 62 -99 SPO 1997 04 02 18 18 37 5.1 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 19 37 4.9 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 20 37 5.3 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 21 38 4.9 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 22 40 4.8 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 23 38 5.0 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 24 38 5.2 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 25 37 4.8 -9 679.00 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 26 37 5.0 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 27 37 4.5 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 28 37 4.8 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 29 36 4.7 -9 679.00 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 30 36 4.7 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 31 35 4.8 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 32 35 4.3 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 33 35 4.3 -9 679.10 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 34 36 4.5 -9 679.10 -57.5 -57.9 -57.6 62 -99 SPO 1997 04 02 18 35 37 4.4 -9 679.10 -57.5 -57.9 -57.6 62 -99 SPO 1997 04 02 18 36 33 4.8 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 37 35 4.3 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 38 36 4.4 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 39 35 4.2 -9 679.10 -57.5 -57.8 -57.5 63 -99 SPO 1997 04 02 18 40 36 4.5 -9 679.10 -57.5 -57.8 -57.5 63 -99 SPO 1997 04 02 18 41 34 4.6 -9 679.10 -57.4 -57.8 -57.5 62 -99 SPO 1997 04 02 18 42 36 4.5 -9 679.10 -57.4 -57.8 -57.5 63 -99 SPO 1997 04 02 18 43 35 4.5 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 44 33 4.4 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 45 35 4.3 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 46 33 4.7 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 47 32 4.5 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 48 32 4.3 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 49 32 4.3 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 50 34 4.5 -9 679.30 -57.4 -57.8 -57.4 63 -99 SPO 1997 04 02 18 51 35 4.5 -9 679.30 -57.3 -57.8 -57.5 62 -99 SPO 1997 04 02 18 52 35 4.2 -9 679.30 -57.3 -57.7 -57.4 63 -99 SPO 1997 04 02 18 53 36 4.3 -9 679.30 -57.3 -57.7 -57.4 62 -99 SPO 1997 04 02 18 54 36 4.3 -9 679.30 -57.3 -57.7 -57.4 62 -99 SPO 1997 04 02 18 55 36 4.3 -9 679.30 -57.3 -57.7 -57.4 61 -99 SPO 1997 04 02 18 56 35 4.5 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 57 34 4.6 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 58 35 4.4 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 59 36 4.5 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 19 00 36 4.1 -9 679.30 -57.3 -57.5 -57.4 62 0 SPO 1997 04 02 19 01 35 4.0 -9 679.30 -57.3 -57.5 -57.4 63 -99 SPO 1997 04 02 19 02 36 4.5 -9 679.30 -57.3 -57.5 -57.3 63 -99 SPO 1997 04 02 19 03 36 4.4 -9 679.30 -57.3 -57.5 -57.3 63 -99 SPO 1997 04 02 19 04 35 4.3 -9 679.40 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 19 05 36 4.0 -9 679.40 -57.2 -57.6 -57.3 62 -99 SPO 1997 04 02 19 06 37 4.1 -9 679.40 -57.2 -57.6 -57.3 62 -99 SPO 1997 04 02 19 07 37 4.5 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 08 36 4.3 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 09 38 3.9 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 10 37 4.1 -9 679.40 -57.2 -57.5 -57.3 61 -99 SPO 1997 04 02 19 11 37 4.4 -9 679.40 -57.2 -57.5 -57.3 61 -99 SPO 1997 04 02 19 12 37 4.5 -9 679.40 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 19 13 38 4.3 -9 679.40 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 14 36 4.5 -9 679.40 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 19 15 37 4.7 -9 679.40 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 16 38 4.4 -9 679.40 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 17 37 4.5 -9 679.40 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 18 38 4.4 -9 679.40 -57.1 -57.3 -57.2 62 -99 SPO 1997 04 02 19 19 38 4.5 -9 679.40 -57.1 -57.3 -57.2 61 -99 SPO 1997 04 02 19 20 38 4.6 -9 679.40 -57.1 -57.3 -57.2 61 -99 SPO 1997 04 02 19 21 38 4.3 -9 679.40 -57.1 -57.4 -57.2 61 -99 SPO 1997 04 02 19 22 38 4.3 -9 679.50 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 23 38 4.3 -9 679.50 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 24 36 4.5 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 25 36 4.7 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 26 37 4.5 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 27 38 4.7 -9 679.50 -57.0 -57.3 -57.2 63 -99 SPO 1997 04 02 19 28 38 4.6 -9 679.50 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 29 37 4.4 -9 679.50 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 30 37 4.7 -9 679.60 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 31 38 4.5 -9 679.60 -57.0 -57.3 -57.1 62 -99 SPO 1997 04 02 19 32 38 4.4 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 33 35 4.2 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 34 35 4.1 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 35 35 4.5 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 36 35 4.2 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 37 35 4.0 -9 679.60 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 38 35 4.3 -9 679.60 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 39 34 4.2 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 40 36 4.1 -9 679.70 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 41 35 4.1 -9 679.70 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 42 36 4.4 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 43 35 4.6 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 44 36 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 45 35 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 46 36 4.3 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 47 36 4.3 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 48 37 4.3 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 49 36 4.5 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 50 36 4.6 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 51 35 4.5 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 52 34 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 53 35 4.1 -9 679.70 -57.1 -57.4 -57.2 61 -99 SPO 1997 04 02 19 54 37 3.6 -9 679.70 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 19 55 38 4.2 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 19 56 39 4.0 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 57 38 4.1 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 58 37 4.4 -9 679.70 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 19 59 37 4.2 -9 679.80 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 20 00 37 4.0 -9 679.80 -57.2 -57.4 -57.2 63 0 SPO 1997 04 02 20 01 36 3.9 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 02 37 3.6 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 03 36 3.8 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 04 37 3.7 -9 679.80 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 20 05 38 4.1 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 06 38 4.0 -9 679.90 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 07 37 4.0 -9 679.80 -57.2 -57.4 -57.2 61 -99 SPO 1997 04 02 20 08 37 3.9 -9 679.80 -57.2 -57.4 -57.2 61 -99 SPO 1997 04 02 20 09 38 3.9 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 10 39 3.7 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 11 38 3.9 -9 679.80 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 20 12 39 3.9 -9 679.80 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 20 13 39 3.9 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 14 39 3.9 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 15 39 3.8 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 16 39 3.8 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 17 40 3.8 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 18 41 3.6 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 19 43 3.6 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 20 44 3.6 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 21 43 3.7 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 22 45 3.3 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 23 45 3.4 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 24 45 3.5 -9 680.00 -57.2 -57.2 -57.3 61 -99 SPO 1997 04 02 20 25 45 3.5 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 26 45 3.6 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 27 45 3.4 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 28 44 3.5 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 29 43 3.7 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 30 44 3.6 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 31 43 3.7 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 32 44 3.9 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 33 45 4.0 -9 680.00 -57.2 -57.2 -57.3 63 -99 SPO 1997 04 02 20 34 46 4.0 -9 680.00 -57.2 -57.2 -57.2 63 -99 SPO 1997 04 02 20 35 46 3.8 -9 680.00 -57.2 -57.1 -57.2 63 -99 SPO 1997 04 02 20 36 46 3.6 -9 680.00 -57.1 -57.1 -57.2 62 -99 SPO 1997 04 02 20 37 47 3.5 -9 680.10 -57.1 -57.0 -57.2 62 -99 SPO 1997 04 02 20 38 47 3.4 -9 680.10 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 02 20 39 46 3.5 -9 680.10 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 02 20 40 46 3.5 -9 680.10 -57.2 -57.0 -57.2 61 -99 SPO 1997 04 02 20 41 47 3.6 -9 680.10 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 02 20 42 49 3.5 -9 680.10 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 02 20 43 46 3.7 -9 680.10 -57.2 -57.1 -57.2 61 -99 SPO 1997 04 02 20 44 47 3.7 -9 680.10 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 45 48 3.7 -9 680.10 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 46 49 3.8 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 47 49 3.7 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 48 51 3.5 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 49 53 3.5 -9 680.10 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 02 20 50 54 3.5 -9 680.20 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 02 20 51 56 3.5 -9 680.20 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 52 55 3.6 -9 680.20 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 02 20 53 54 3.7 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 54 53 3.8 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 55 53 3.8 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 56 51 3.9 -9 680.10 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 02 20 57 51 4.0 -9 680.20 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 02 20 58 51 4.0 -9 680.20 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 02 20 59 51 4.1 -9 680.20 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 02 21 00 52 4.1 -9 680.20 -57.2 -57.1 -57.3 62 0 SPO 1997 04 02 21 01 52 3.6 -9 680.20 -57.3 -57.1 -57.3 63 -99 SPO 1997 04 02 21 02 52 3.7 -9 680.20 -57.3 -57.2 -57.3 63 -99 SPO 1997 04 02 21 03 54 4.0 -9 680.30 -57.3 -57.2 -57.3 63 -99 SPO 1997 04 02 21 04 52 3.8 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 05 52 3.8 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 06 54 4.0 -9 680.20 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 02 21 07 51 4.0 -9 680.20 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 02 21 08 53 4.1 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 09 50 4.2 -9 680.20 -57.4 -57.1 -57.4 63 -99 SPO 1997 04 02 21 10 52 4.0 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 11 48 3.9 -9 680.20 -57.4 -57.2 -57.4 63 -99 SPO 1997 04 02 21 12 50 3.7 -9 680.20 -57.4 -57.1 -57.4 63 -99 SPO 1997 04 02 21 13 51 3.9 -9 680.30 -57.4 -57.2 -57.4 62 -99 SPO 1997 04 02 21 14 50 4.0 -9 680.30 -57.4 -57.1 -57.4 61 -99 SPO 1997 04 02 21 15 50 3.8 -9 680.30 -57.4 -57.2 -57.4 61 -99 SPO 1997 04 02 21 16 53 3.8 -9 680.30 -57.4 -57.3 -57.4 61 -99 SPO 1997 04 02 21 17 54 3.5 -9 680.30 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 02 21 18 56 3.3 -9 680.30 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 02 21 19 57 3.5 -9 680.30 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 02 21 20 60 3.3 -9 680.40 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 02 21 21 58 3.4 -9 680.40 -57.6 -57.6 -57.6 63 -99 SPO 1997 04 02 21 22 59 3.5 -9 680.40 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 02 21 23 58 3.6 -9 680.40 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 02 21 24 58 3.6 -9 680.40 -57.7 -57.7 -57.7 61 -99 SPO 1997 04 02 21 25 56 3.6 -9 680.40 -57.7 -57.7 -57.7 61 -99 SPO 1997 04 02 21 26 57 3.6 -9 680.40 -57.7 -57.7 -57.7 60 -99 SPO 1997 04 02 21 27 57 3.8 -9 680.40 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 02 21 28 56 3.6 -9 680.40 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 02 21 29 56 3.4 -9 680.40 -57.8 -57.7 -57.8 59 -99 SPO 1997 04 02 21 30 54 3.3 -9 680.40 -57.8 -57.8 -57.8 59 -99 SPO 1997 04 02 21 31 53 3.3 -9 680.40 -57.8 -57.8 -57.8 59 -99 SPO 1997 04 02 21 32 55 3.5 -9 680.40 -57.8 -57.8 -57.9 59 -99 SPO 1997 04 02 21 33 55 3.5 -9 680.40 -57.8 -57.9 -57.9 60 -99 SPO 1997 04 02 21 34 56 3.5 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 35 59 3.2 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 36 59 3.0 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 37 58 2.9 -9 680.50 -57.9 -57.9 -57.9 61 -99 SPO 1997 04 02 21 38 57 3.1 -9 680.50 -57.9 -57.9 -57.9 61 -99 SPO 1997 04 02 21 39 56 3.1 -9 680.50 -57.9 -57.9 -57.9 60 -99 SPO 1997 04 02 21 40 54 3.2 -9 680.50 -57.9 -57.9 -58.0 60 -99 SPO 1997 04 02 21 41 56 3.3 -9 680.50 -57.9 -57.9 -58.0 59 -99 SPO 1997 04 02 21 42 56 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 43 57 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 44 57 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 45 57 3.4 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 46 57 3.5 -9 680.50 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 02 21 47 56 3.6 -9 680.50 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 02 21 48 56 3.8 -9 680.50 -58.1 -58.0 -58.1 61 -99 SPO 1997 04 02 21 49 56 3.9 -9 680.50 -58.1 -58.0 -58.1 61 -99 SPO 1997 04 02 21 50 54 4.0 -9 680.50 -58.1 -58.0 -58.2 61 -99 SPO 1997 04 02 21 51 54 4.0 -9 680.50 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 02 21 52 55 4.1 -9 680.50 -58.2 -58.0 -58.2 61 -99 SPO 1997 04 02 21 53 57 4.0 -9 680.60 -58.2 -58.1 -58.2 60 -99 SPO 1997 04 02 21 54 57 3.8 -9 680.60 -58.2 -58.1 -58.2 60 -99 SPO 1997 04 02 21 55 58 3.7 -9 680.60 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 02 21 56 57 3.9 -9 680.60 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 02 21 57 57 3.8 -9 680.60 -58.3 -58.1 -58.3 62 -99 SPO 1997 04 02 21 58 57 3.8 -9 680.60 -58.3 -58.1 -58.3 62 -99 SPO 1997 04 02 21 59 57 3.7 -9 680.60 -58.3 -58.1 -58.4 62 -99 SPO 1997 04 02 22 00 57 3.7 -9 680.60 -58.3 -58.1 -58.4 61 0 SPO 1997 04 02 22 01 58 3.6 -9 680.60 -58.3 -58.1 -58.4 61 -99 SPO 1997 04 02 22 02 57 3.7 -9 680.60 -58.4 -58.1 -58.4 61 -99 SPO 1997 04 02 22 03 58 3.8 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 04 57 3.8 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 05 59 3.7 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 06 60 3.6 -9 680.70 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 07 62 3.4 -9 680.70 -58.4 -58.3 -58.5 59 -99 SPO 1997 04 02 22 08 62 3.1 -9 680.70 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 09 62 3.1 -9 680.70 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 10 62 3.2 -9 680.70 -58.5 -58.3 -58.5 61 -99 SPO 1997 04 02 22 11 62 3.0 -9 680.80 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 12 64 3.0 -9 680.80 -58.5 -58.3 -58.6 60 -99 SPO 1997 04 02 22 13 65 3.2 -9 680.80 -58.5 -58.3 -58.6 60 -99 SPO 1997 04 02 22 14 66 3.1 -9 680.80 -58.6 -58.3 -58.6 61 -99 SPO 1997 04 02 22 15 66 3.2 -9 680.80 -58.6 -58.3 -58.6 60 -99 SPO 1997 04 02 22 16 63 3.5 -9 680.80 -58.6 -58.3 -58.6 59 -99 SPO 1997 04 02 22 17 62 3.6 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 18 62 3.8 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 19 60 3.8 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 20 60 3.8 -9 680.80 -58.6 -58.4 -58.6 59 -99 SPO 1997 04 02 22 21 60 3.9 -9 680.80 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 22 60 3.7 -9 680.80 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 02 22 23 59 3.6 -9 680.90 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 02 22 24 58 3.6 -9 680.90 -58.7 -58.4 -58.7 61 -99 SPO 1997 04 02 22 25 58 3.6 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 26 58 3.9 -9 680.90 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 27 56 3.9 -9 680.90 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 28 55 3.8 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 29 53 3.9 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 30 54 4.1 -9 680.90 -58.7 -58.4 -58.7 59 -99 SPO 1997 04 02 22 31 54 4.0 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 32 55 3.9 -9 680.90 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 33 55 4.0 -9 681.00 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 34 55 3.7 -9 681.00 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 35 57 3.7 -9 681.00 -58.7 -58.3 -58.7 59 -99 SPO 1997 04 02 22 36 57 3.6 -9 681.00 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 37 57 3.4 -9 681.00 -58.7 -58.4 -58.8 59 -99 SPO 1997 04 02 22 38 56 3.4 -9 681.00 -58.8 -58.4 -58.8 60 -99 SPO 1997 04 02 22 39 58 3.4 -9 681.00 -58.8 -58.3 -58.9 59 -99 SPO 1997 04 02 22 40 57 3.4 -9 681.10 -58.8 -58.3 -58.9 59 -99 SPO 1997 04 02 22 41 58 3.4 -9 681.00 -58.8 -58.3 -58.9 58 -99 SPO 1997 04 02 22 42 57 3.5 -9 681.00 -58.9 -58.3 -58.9 59 -99 SPO 1997 04 02 22 43 58 3.5 -9 681.00 -58.9 -58.3 -58.9 60 -99 SPO 1997 04 02 22 44 58 3.5 -9 681.00 -58.9 -58.3 -59.0 60 -99 SPO 1997 04 02 22 45 57 3.5 -9 681.00 -58.9 -58.4 -59.0 60 -99 SPO 1997 04 02 22 46 58 3.4 -9 681.00 -58.9 -58.4 -59.0 61 -99 SPO 1997 04 02 22 47 58 3.5 -9 681.00 -59.0 -58.4 -59.0 61 -99 SPO 1997 04 02 22 48 57 3.4 -9 681.00 -59.0 -58.4 -59.0 61 -99 SPO 1997 04 02 22 49 57 3.5 -9 681.00 -59.0 -58.5 -59.1 60 -99 SPO 1997 04 02 22 50 54 3.8 -9 681.00 -59.0 -58.5 -59.1 59 -99 SPO 1997 04 02 22 51 52 4.0 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 52 51 4.3 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 53 50 4.4 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 54 49 4.4 -9 681.00 -59.0 -58.4 -59.0 59 -99 SPO 1997 04 02 22 55 48 4.4 -9 681.00 -59.0 -58.3 -59.0 59 -99 SPO 1997 04 02 22 56 47 4.5 -9 681.00 -59.0 -58.2 -59.1 60 -99 SPO 1997 04 02 22 57 46 4.4 -9 681.00 -59.0 -58.1 -59.1 60 -99 SPO 1997 04 02 22 58 46 4.2 -9 681.00 -59.0 -58.1 -59.1 61 -99 SPO 1997 04 02 22 59 46 3.9 -9 681.00 -59.0 -58.1 -59.1 61 -99 SPO 1997 04 02 23 00 49 3.7 -9 681.10 -59.0 -58.2 -59.1 61 0 SPO 1997 04 02 23 01 53 3.4 -9 681.10 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 02 23 02 57 3.3 -9 681.20 -59.1 -58.2 -59.2 59 -99 SPO 1997 04 02 23 03 59 3.2 -9 681.20 -59.1 -58.3 -59.2 58 -99 SPO 1997 04 02 23 04 58 3.1 -9 681.20 -59.1 -58.4 -59.2 58 -99 SPO 1997 04 02 23 05 58 3.4 -9 681.20 -59.1 -58.4 -59.2 58 -99 SPO 1997 04 02 23 06 59 3.5 -9 681.10 -59.2 -58.4 -59.2 59 -99 SPO 1997 04 02 23 07 58 3.8 -9 681.10 -59.2 -58.3 -59.2 59 -99 SPO 1997 04 02 23 08 58 3.8 -9 681.10 -59.2 -58.3 -59.2 59 -99 SPO 1997 04 02 23 09 57 4.0 -9 681.10 -59.2 -58.3 -59.2 60 -99 SPO 1997 04 02 23 10 57 4.1 -9 681.10 -59.2 -58.3 -59.3 59 -99 SPO 1997 04 02 23 11 58 4.1 -9 681.10 -59.3 -58.3 -59.3 60 -99 SPO 1997 04 02 23 12 58 4.2 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 13 58 4.0 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 14 56 4.2 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 15 56 4.2 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 16 55 4.4 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 17 54 4.5 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 18 54 4.4 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 19 55 4.5 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 20 54 4.4 -9 681.10 -59.3 -58.1 -59.3 60 -99 SPO 1997 04 02 23 21 54 4.3 -9 681.10 -59.3 -58.1 -59.3 60 -99 SPO 1997 04 02 23 22 54 4.5 -9 681.20 -59.3 -58.1 -59.4 60 -99 SPO 1997 04 02 23 23 54 4.3 -9 681.20 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 24 55 4.2 -9 681.10 -59.3 -58.3 -59.3 60 -99 SPO 1997 04 02 23 25 55 4.3 -9 681.10 -59.3 -58.3 -59.4 60 -99 SPO 1997 04 02 23 26 56 4.4 -9 681.10 -59.3 -58.3 -59.4 59 -99 SPO 1997 04 02 23 27 57 4.4 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 28 58 4.5 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 29 57 4.3 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 30 57 4.2 -9 681.10 -59.4 -58.4 -59.5 60 -99 SPO 1997 04 02 23 31 57 4.4 -9 681.10 -59.4 -58.4 -59.5 60 -99 SPO 1997 04 02 23 32 57 4.4 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 33 56 4.5 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 34 57 4.6 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 35 57 4.5 -9 681.10 -59.4 -58.4 -59.4 60 -99 SPO 1997 04 02 23 36 58 4.7 -9 681.10 -59.4 -58.4 -59.4 59 -99 SPO 1997 04 02 23 37 59 4.5 -9 681.10 -59.4 -58.3 -59.4 58 -99 SPO 1997 04 02 23 38 61 4.4 -9 681.10 -59.4 -58.3 -59.5 58 -99 SPO 1997 04 02 23 39 62 4.5 -9 681.10 -59.4 -58.4 -59.5 58 -99 SPO 1997 04 02 23 40 63 4.5 -9 681.10 -59.4 -58.4 -59.5 59 -99 SPO 1997 04 02 23 41 64 4.7 -9 681.10 -59.5 -58.4 -59.5 60 -99 SPO 1997 04 02 23 42 63 4.7 -9 681.10 -59.5 -58.5 -59.6 61 -99 SPO 1997 04 02 23 43 63 4.8 -9 681.10 -59.5 -58.4 -59.6 60 -99 SPO 1997 04 02 23 44 62 5.1 -9 681.10 -59.5 -58.2 -59.6 60 -99 SPO 1997 04 02 23 45 61 5.1 -9 681.10 -59.5 -58.1 -59.6 60 -99 SPO 1997 04 02 23 46 61 5.0 -9 681.10 -59.5 -58.2 -59.6 59 -99 SPO 1997 04 02 23 47 62 5.1 -9 681.20 -59.5 -58.2 -59.6 58 -99 SPO 1997 04 02 23 48 61 4.7 -9 681.20 -59.5 -58.2 -59.6 58 -99 SPO 1997 04 02 23 49 61 4.7 -9 681.20 -59.5 -58.4 -59.6 58 -99 SPO 1997 04 02 23 50 62 4.8 -9 681.20 -59.5 -58.5 -59.6 57 -99 SPO 1997 04 02 23 51 61 4.7 -9 681.20 -59.6 -58.6 -59.6 57 -99 SPO 1997 04 02 23 52 61 4.5 -9 681.20 -59.6 -58.5 -59.6 57 -99 SPO 1997 04 02 23 53 62 4.5 -9 681.20 -59.6 -58.6 -59.6 58 -99 SPO 1997 04 02 23 54 60 4.3 -9 681.20 -59.6 -58.5 -59.6 58 -99 SPO 1997 04 02 23 55 60 4.3 -9 681.20 -59.6 -58.7 -59.6 58 -99 SPO 1997 04 02 23 56 60 4.5 -9 681.20 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 02 23 57 62 4.6 -9 681.20 -59.6 -58.6 -59.7 59 -99 SPO 1997 04 02 23 58 63 4.4 -9 681.20 -59.6 -58.6 -59.7 -99 -99 SPO 1997 04 02 23 59 65 4.2 -9 681.20 -59.6 -58.5 -59.7 -99 -99 SPO 1997 04 03 00 00 64 4.4 -9 681.20 -59.7 -58.6 -59.7 -99 0 SPO 1997 04 03 00 01 64 4.5 -9 681.30 -59.7 -58.6 -59.7 -99 -99 SPO 1997 04 03 00 02 65 4.6 -9 681.30 -59.7 -58.5 -59.8 -99 -99 SPO 1997 04 03 00 03 65 4.7 -9 681.30 -59.7 -58.5 -59.8 -99 -99 SPO 1997 04 03 00 04 65 4.7 -9 681.20 -59.7 -58.4 -59.8 -99 -99 SPO 1997 04 03 00 05 65 4.8 -9 681.30 -59.7 -58.4 -59.8 -99 -99 SPO 1997 04 03 00 06 65 4.8 -9 681.30 -59.8 -58.3 -59.8 -99 -99 SPO 1997 04 03 00 07 65 4.8 -9 681.30 -59.8 -58.3 -59.8 -99 -99 SPO 1997 04 03 00 08 65 4.8 -9 681.30 -59.8 -58.3 -59.9 -99 -99 SPO 1997 04 03 00 09 66 4.6 -9 681.30 -59.8 -58.3 -59.9 -99 -99 SPO 1997 04 03 00 10 67 4.5 -9 681.30 -59.9 -58.4 -60.0 -99 -99 SPO 1997 04 03 00 11 68 4.5 -9 681.30 -59.9 -58.4 -60.0 -99 -99 SPO 1997 04 03 00 12 69 4.5 -9 681.30 -60.0 -58.4 -60.1 -99 -99 SPO 1997 04 03 00 13 72 4.2 -9 681.30 -60.1 -58.5 -60.2 59 -99 SPO 1997 04 03 00 14 75 4.0 -9 681.30 -60.2 -58.5 -60.2 59 -99 SPO 1997 04 03 00 15 75 4.0 -9 681.40 -60.2 -58.5 -60.3 58 -99 SPO 1997 04 03 00 16 75 4.0 -9 681.40 -60.4 -58.5 -60.4 60 -99 SPO 1997 04 03 00 17 74 4.2 -9 681.40 -60.4 -58.4 -60.5 60 -99 SPO 1997 04 03 00 18 73 4.3 -9 681.40 -60.5 -58.3 -60.5 60 -99 SPO 1997 04 03 00 19 72 4.4 -9 681.40 -60.6 -58.2 -60.6 60 -99 SPO 1997 04 03 00 20 74 4.2 -9 681.40 -60.6 -58.1 -60.6 59 -99 SPO 1997 04 03 00 21 74 4.2 -9 681.40 -60.7 -58.1 -60.7 59 -99 SPO 1997 04 03 00 22 73 4.4 -9 681.40 -60.7 -58.1 -60.8 59 -99 SPO 1997 04 03 00 23 72 4.6 -9 681.40 -60.8 -58.0 -60.8 59 -99 SPO 1997 04 03 00 24 74 4.4 -9 681.40 -60.8 -58.0 -60.8 59 -99 SPO 1997 04 03 00 25 75 4.3 -9 681.40 -60.9 -58.0 -60.9 59 -99 SPO 1997 04 03 00 26 76 4.3 -9 681.40 -60.9 -58.0 -60.9 57 -99 SPO 1997 04 03 00 27 74 4.3 -9 681.40 -61.0 -58.0 -60.9 58 -99 SPO 1997 04 03 00 28 72 4.7 -9 681.30 -61.0 -58.0 -61.0 59 -99 SPO 1997 04 03 00 29 71 4.8 -9 681.30 -61.0 -58.0 -61.0 59 -99 SPO 1997 04 03 00 30 72 4.9 -9 681.30 -61.0 -57.9 -61.0 59 -99 SPO 1997 04 03 00 31 73 4.9 -9 681.40 -61.1 -57.8 -61.1 60 -99 SPO 1997 04 03 00 32 75 4.7 -9 681.40 -61.1 -57.9 -61.1 60 -99 SPO 1997 04 03 00 33 77 4.8 -9 681.40 -61.0 -57.9 -61.1 59 -99 SPO 1997 04 03 00 34 78 4.8 -9 681.40 -61.0 -58.0 -61.1 58 -99 SPO 1997 04 03 00 35 77 4.8 -9 681.40 -61.1 -58.0 -61.1 59 -99 SPO 1997 04 03 00 36 75 4.8 -9 681.40 -61.0 -58.0 -61.1 58 -99 SPO 1997 04 03 00 37 74 4.9 -9 681.40 -61.0 -58.0 -61.1 57 -99 SPO 1997 04 03 00 38 74 4.9 -9 681.40 -61.0 -57.9 -61.1 57 -99 SPO 1997 04 03 00 39 74 4.7 -9 681.40 -61.0 -57.9 -61.0 58 -99 SPO 1997 04 03 00 40 75 4.7 -9 681.40 -61.0 -57.9 -61.1 57 -99 SPO 1997 04 03 00 41 75 4.7 -9 681.40 -61.1 -58.0 -61.1 58 -99 SPO 1997 04 03 00 42 76 4.7 -9 681.40 -61.1 -57.9 -61.1 58 -99 SPO 1997 04 03 00 43 77 4.6 -9 681.40 -61.1 -58.0 -61.1 59 -99 SPO 1997 04 03 00 44 78 4.5 -9 681.40 -61.1 -58.0 -61.2 59 -99 SPO 1997 04 03 00 45 79 4.4 -9 681.40 -61.2 -58.0 -61.2 59 -99 SPO 1997 04 03 00 46 79 4.4 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 47 79 4.5 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 48 78 4.6 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 49 78 4.6 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 50 76 4.8 -9 681.40 -61.1 -58.0 -61.2 58 -99 SPO 1997 04 03 00 51 75 4.9 -9 681.40 -61.1 -57.9 -61.2 59 -99 SPO 1997 04 03 00 52 75 5.1 -9 681.40 -61.1 -57.8 -61.2 59 -99 SPO 1997 04 03 00 53 74 5.1 -9 681.40 -61.1 -57.7 -61.1 59 -99 SPO 1997 04 03 00 54 74 5.2 -9 681.40 -61.1 -57.7 -61.1 59 -99 SPO 1997 04 03 00 55 74 5.2 -9 681.40 -61.0 -57.6 -61.1 59 -99 SPO 1997 04 03 00 56 73 5.3 -9 681.40 -61.0 -57.6 -61.1 58 -99 SPO 1997 04 03 00 57 73 5.3 -9 681.40 -61.0 -57.6 -61.1 57 -99 SPO 1997 04 03 00 58 74 5.4 -9 681.40 -61.0 -57.7 -61.1 57 -99 SPO 1997 04 03 00 59 73 5.5 -9 681.40 -61.1 -57.7 -61.2 58 -99 SPO 1997 04 03 01 00 72 5.6 -9 681.40 -61.1 -57.8 -61.2 58 0 SPO 1997 04 03 01 01 72 5.6 -9 681.40 -61.1 -57.6 -61.2 58 -99 SPO 1997 04 03 01 02 71 5.6 -9 681.40 -61.1 -57.5 -61.2 59 -99 SPO 1997 04 03 01 03 71 5.7 -9 681.40 -61.1 -57.4 -61.2 59 -99 SPO 1997 04 03 01 04 71 5.7 -9 681.40 -61.1 -57.4 -61.2 60 -99 SPO 1997 04 03 01 05 70 5.7 -9 681.40 -61.1 -57.3 -61.1 60 -99 SPO 1997 04 03 01 06 69 5.5 -9 681.40 -61.1 -57.3 -61.1 61 -99 SPO 1997 04 03 01 07 70 5.5 -9 681.40 -61.0 -57.3 -61.2 60 -99 SPO 1997 04 03 01 08 71 5.4 -9 681.40 -61.0 -57.3 -61.1 60 -99 SPO 1997 04 03 01 09 72 5.4 -9 681.40 -61.1 -57.3 -61.1 60 -99 SPO 1997 04 03 01 10 73 5.4 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 11 75 5.3 -9 681.40 -61.0 -57.3 -61.2 58 -99 SPO 1997 04 03 01 12 76 5.3 -9 681.40 -61.1 -57.3 -61.2 58 -99 SPO 1997 04 03 01 13 76 5.3 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 14 76 5.3 -9 681.50 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 15 77 5.3 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 16 77 5.3 -9 681.40 -61.2 -57.3 -61.2 59 -99 SPO 1997 04 03 01 17 77 5.4 -9 681.50 -61.2 -57.3 -61.3 59 -99 SPO 1997 04 03 01 18 78 5.4 -9 681.50 -61.2 -57.4 -61.3 59 -99 SPO 1997 04 03 01 19 77 5.5 -9 681.50 -61.2 -57.5 -61.3 59 -99 SPO 1997 04 03 01 20 76 5.6 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 21 76 5.6 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 22 75 5.7 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 23 75 5.8 -9 681.50 -61.2 -57.5 -61.3 58 -99 SPO 1997 04 03 01 24 75 5.9 -9 681.50 -61.3 -57.6 -61.3 59 -99 SPO 1997 04 03 01 25 74 6.0 -9 681.40 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 26 74 6.1 -9 681.40 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 27 73 6.1 -9 681.40 -61.2 -57.4 -61.2 59 -99 SPO 1997 04 03 01 28 72 6.1 -9 681.40 -61.2 -57.4 -61.2 59 -99 SPO 1997 04 03 01 29 71 6.2 -9 681.40 -61.2 -57.4 -61.2 61 -99 SPO 1997 04 03 01 30 70 6.2 -9 681.40 -61.2 -57.1 -61.2 61 -99 SPO 1997 04 03 01 31 70 6.1 -9 681.40 -61.2 -56.9 -61.2 61 -99 SPO 1997 04 03 01 32 71 6.1 -9 681.40 -61.2 -56.9 -61.2 59 -99 SPO 1997 04 03 01 33 70 6.2 -9 681.40 -61.2 -57.0 -61.2 59 -99 SPO 1997 04 03 01 34 70 6.2 -9 681.40 -61.1 -56.9 -61.2 60 -99 SPO 1997 04 03 01 35 70 6.2 -9 681.50 -61.1 -56.7 -61.2 60 -99 SPO 1997 04 03 01 36 69 6.2 -9 681.40 -61.1 -56.6 -61.1 60 -99 SPO 1997 04 03 01 37 69 6.2 -9 681.50 -61.0 -56.4 -61.1 59 -99 SPO 1997 04 03 01 38 69 6.2 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 01 39 70 6.0 -9 681.50 -61.0 -56.5 -61.1 60 -99 SPO 1997 04 03 01 40 70 5.9 -9 681.50 -61.0 -56.7 -61.1 60 -99 SPO 1997 04 03 01 41 70 5.7 -9 681.50 -61.0 -56.8 -61.1 60 -99 SPO 1997 04 03 01 42 71 5.6 -9 681.50 -61.0 -57.0 -61.1 60 -99 SPO 1997 04 03 01 43 73 5.4 -9 681.50 -61.0 -57.0 -61.1 60 -99 SPO 1997 04 03 01 44 74 5.3 -9 681.50 -61.0 -57.2 -61.1 60 -99 SPO 1997 04 03 01 45 74 5.4 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 46 74 5.5 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 47 74 5.6 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 48 74 5.7 -9 681.50 -61.0 -57.3 -61.1 60 -99 SPO 1997 04 03 01 49 74 5.7 -9 681.50 -61.0 -57.2 -61.1 60 -99 SPO 1997 04 03 01 50 75 5.8 -9 681.50 -61.1 -57.2 -61.2 61 -99 SPO 1997 04 03 01 51 75 5.9 -9 681.50 -61.1 -57.2 -61.2 61 -99 SPO 1997 04 03 01 52 74 5.9 -9 681.50 -61.1 -57.1 -61.2 61 -99 SPO 1997 04 03 01 53 73 6.0 -9 681.50 -61.1 -57.0 -61.2 61 -99 SPO 1997 04 03 01 54 72 6.1 -9 681.50 -61.1 -56.8 -61.2 60 -99 SPO 1997 04 03 01 55 72 6.2 -9 681.50 -61.1 -56.8 -61.1 60 -99 SPO 1997 04 03 01 56 72 6.2 -9 681.50 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 01 57 71 6.1 -9 681.50 -61.0 -56.7 -61.1 58 -99 SPO 1997 04 03 01 58 71 6.0 -9 681.50 -61.0 -56.6 -61.1 57 -99 SPO 1997 04 03 01 59 71 6.0 -9 681.50 -61.0 -56.7 -61.1 58 -99 SPO 1997 04 03 02 00 71 5.9 -9 681.50 -61.0 -56.8 -61.1 59 0 SPO 1997 04 03 02 01 70 5.9 -9 681.50 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 02 70 5.8 -9 681.50 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 03 70 5.8 -9 681.50 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 04 70 5.8 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 05 70 5.9 -9 681.50 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 06 69 5.7 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 07 70 5.6 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 08 71 5.5 -9 681.60 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 09 72 5.4 -9 681.60 -61.0 -56.5 -61.1 60 -99 SPO 1997 04 03 02 10 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 11 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 12 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 13 71 5.3 -9 681.60 -61.0 -56.6 -61.1 59 -99 SPO 1997 04 03 02 14 71 5.3 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 15 70 5.3 -9 681.60 -61.1 -56.7 -61.1 60 -99 SPO 1997 04 03 02 16 71 5.3 -9 681.60 -61.1 -56.7 -61.1 61 -99 SPO 1997 04 03 02 17 73 5.2 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 18 73 5.2 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 19 73 5.3 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 20 73 5.3 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 21 74 5.3 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 22 74 5.2 -9 681.70 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 23 74 5.2 -9 681.70 -61.0 -56.7 -61.2 60 -99 SPO 1997 04 03 02 24 75 5.0 -9 681.70 -61.1 -56.8 -61.2 61 -99 SPO 1997 04 03 02 25 76 4.8 -9 681.70 -61.2 -56.8 -61.2 62 -99 SPO 1997 04 03 02 26 78 4.8 -9 681.70 -61.2 -56.9 -61.3 62 -99 SPO 1997 04 03 02 27 78 4.9 -9 681.70 -61.2 -56.9 -61.3 61 -99 SPO 1997 04 03 02 28 78 5.0 -9 681.70 -61.2 -56.9 -61.3 59 -99 SPO 1997 04 03 02 29 79 5.0 -9 681.70 -61.3 -56.8 -61.3 59 -99 SPO 1997 04 03 02 30 80 5.1 -9 681.70 -61.4 -56.8 -61.4 60 -99 SPO 1997 04 03 02 31 80 5.1 -9 681.70 -61.4 -56.8 -61.4 59 -99 SPO 1997 04 03 02 32 83 5.0 -9 681.70 -61.5 -56.7 -61.5 60 -99 SPO 1997 04 03 02 33 88 4.7 -9 681.70 -61.6 -56.8 -61.6 60 -99 SPO 1997 04 03 02 34 89 4.5 -9 681.70 -61.7 -56.9 -61.8 59 -99 SPO 1997 04 03 02 35 89 4.6 -9 681.70 -61.9 -57.0 -61.9 60 -99 SPO 1997 04 03 02 36 89 4.4 -9 681.70 -61.8 -56.9 -61.6 60 -99 SPO 1997 04 03 02 37 89 4.2 -9 681.70 -61.7 -56.8 -61.7 59 -99 SPO 1997 04 03 02 38 91 4.0 -9 681.80 -61.9 -56.9 -61.9 61 -99 SPO 1997 04 03 02 39 92 4.1 -9 681.80 -62.0 -57.0 -62.0 60 -99 SPO 1997 04 03 02 40 93 4.0 -9 681.80 -62.0 -56.9 -61.9 60 -99 SPO 1997 04 03 02 41 92 3.9 -9 681.80 -62.0 -56.9 -61.9 60 -99 SPO 1997 04 03 02 42 93 3.8 -9 681.80 -62.0 -56.9 -62.0 59 -99 SPO 1997 04 03 02 43 92 3.9 -9 681.80 -62.0 -56.8 -61.9 57 -99 SPO 1997 04 03 02 44 90 4.1 -9 681.80 -61.9 -56.9 -61.8 58 -99 SPO 1997 04 03 02 45 90 4.0 -9 681.80 -61.9 -56.8 -61.8 59 -99 SPO 1997 04 03 02 46 93 4.1 -9 681.80 -61.8 -56.8 -61.7 58 -99 SPO 1997 04 03 02 47 94 4.1 -9 681.80 -61.8 -56.7 -61.7 59 -99 SPO 1997 04 03 02 48 91 4.3 -9 681.80 -61.7 -56.7 -61.7 59 -99 SPO 1997 04 03 02 49 92 4.3 -9 681.80 -61.7 -56.7 -61.6 61 -99 SPO 1997 04 03 02 50 93 4.3 -9 681.80 -61.6 -56.7 -61.6 61 -99 SPO 1997 04 03 02 51 93 4.3 -9 681.80 -61.6 -56.7 -61.6 60 -99 SPO 1997 04 03 02 52 92 4.5 -9 681.80 -61.6 -56.6 -61.6 60 -99 SPO 1997 04 03 02 53 94 4.5 -9 681.80 -61.5 -56.7 -61.5 59 -99 SPO 1997 04 03 02 54 96 4.4 -9 681.80 -61.4 -56.7 -61.5 59 -99 SPO 1997 04 03 02 55 96 4.3 -9 681.80 -61.5 -56.8 -61.5 60 -99 SPO 1997 04 03 02 56 93 4.5 -9 681.80 -61.4 -56.6 -61.5 59 -99 SPO 1997 04 03 02 57 90 4.5 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 02 58 90 4.5 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 02 59 92 4.4 -9 681.80 -61.2 -56.4 -61.4 59 -99 SPO 1997 04 03 03 00 94 4.3 -9 681.80 -61.3 -56.6 -61.4 60 0 SPO 1997 04 03 03 01 92 4.4 -9 681.80 -61.3 -56.6 -61.4 62 -99 SPO 1997 04 03 03 02 89 4.6 -9 681.80 -61.3 -56.6 -61.4 60 -99 SPO 1997 04 03 03 03 88 4.7 -9 681.80 -61.3 -56.5 -61.4 59 -99 SPO 1997 04 03 03 04 87 4.8 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 03 05 86 4.7 -9 681.80 -61.2 -56.5 -61.4 59 -99 SPO 1997 04 03 03 06 86 4.6 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 03 07 87 4.4 -9 681.80 -61.3 -56.3 -61.4 59 -99 SPO 1997 04 03 03 08 87 4.3 -9 681.80 -61.3 -56.2 -61.4 59 -99 SPO 1997 04 03 03 09 87 4.5 -9 681.80 -61.3 -56.0 -61.4 59 -99 SPO 1997 04 03 03 10 87 4.5 -9 681.80 -61.4 -56.0 -61.4 60 -99 SPO 1997 04 03 03 11 88 4.5 -9 681.80 -61.3 -56.0 -61.4 60 -99 SPO 1997 04 03 03 12 88 4.5 -9 681.80 -61.3 -55.9 -61.4 60 -99 SPO 1997 04 03 03 13 89 4.3 -9 681.80 -61.4 -55.9 -61.5 60 -99 SPO 1997 04 03 03 14 89 4.3 -9 681.80 -61.4 -55.8 -61.5 60 -99 SPO 1997 04 03 03 15 89 4.3 -9 681.80 -61.5 -55.8 -61.5 60 -99 SPO 1997 04 03 03 16 88 4.4 -9 681.80 -61.5 -55.8 -61.5 60 -99 SPO 1997 04 03 03 17 87 4.5 -9 681.80 -61.5 -55.7 -61.5 60 -99 SPO 1997 04 03 03 18 87 4.5 -9 681.80 -61.4 -55.6 -61.4 59 -99 SPO 1997 04 03 03 19 87 4.6 -9 681.80 -61.4 -55.6 -61.4 59 -99 SPO 1997 04 03 03 20 87 4.5 -9 681.80 -61.4 -55.6 -61.5 59 -99 SPO 1997 04 03 03 21 88 4.3 -9 681.80 -61.4 -55.6 -61.5 59 -99 SPO 1997 04 03 03 22 89 4.0 -9 681.80 -61.5 -55.6 -61.6 60 -99 SPO 1997 04 03 03 23 91 4.0 -9 681.80 -61.6 -55.6 -61.7 61 -99 SPO 1997 04 03 03 24 91 4.1 -9 681.80 -61.7 -55.6 -61.8 62 -99 SPO 1997 04 03 03 25 91 4.1 -9 681.90 -61.7 -55.6 -61.8 61 -99 SPO 1997 04 03 03 26 91 4.0 -9 681.90 -61.8 -55.6 -61.8 60 -99 SPO 1997 04 03 03 27 92 3.9 -9 681.90 -61.8 -55.7 -61.8 59 -99 SPO 1997 04 03 03 28 91 3.8 -9 681.90 -61.8 -55.8 -61.8 58 -99 SPO 1997 04 03 03 29 91 3.8 -9 681.90 -61.9 -55.9 -61.9 59 -99 SPO 1997 04 03 03 30 90 3.8 -9 681.90 -61.9 -55.9 -61.9 59 -99 SPO 1997 04 03 03 31 90 3.8 -9 681.90 -62.0 -55.8 -61.9 60 -99 SPO 1997 04 03 03 32 91 3.7 -9 681.90 -62.0 -55.7 -62.0 60 -99 SPO 1997 04 03 03 33 91 3.7 -9 681.90 -62.1 -55.7 -62.0 61 -99 SPO 1997 04 03 03 34 92 3.7 -9 681.90 -62.2 -55.7 -62.1 61 -99 SPO 1997 04 03 03 35 92 3.7 -9 681.90 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 03 36 91 3.8 -9 681.90 -62.3 -55.7 -62.2 59 -99 SPO 1997 04 03 03 37 88 3.8 -9 681.90 -62.4 -55.6 -62.2 59 -99 SPO 1997 04 03 03 38 88 3.6 -9 681.90 -62.2 -55.4 -62.2 58 -99 SPO 1997 04 03 03 39 91 3.5 -9 682.00 -62.2 -55.6 -62.1 58 -99 SPO 1997 04 03 03 40 93 3.5 -9 682.00 -62.2 -55.9 -62.2 58 -99 SPO 1997 04 03 03 41 94 3.4 -9 682.00 -62.3 -56.0 -62.2 58 -99 SPO 1997 04 03 03 42 94 3.4 -9 682.00 -62.3 -55.8 -62.2 58 -99 SPO 1997 04 03 03 43 94 3.3 -9 682.00 -62.3 -55.6 -62.3 58 -99 SPO 1997 04 03 03 44 94 3.2 -9 682.00 -62.4 -55.5 -62.4 58 -99 SPO 1997 04 03 03 45 94 3.2 -9 682.00 -62.5 -55.4 -62.4 57 -99 SPO 1997 04 03 03 46 93 3.3 -9 682.00 -62.6 -55.4 -62.5 58 -99 SPO 1997 04 03 03 47 95 3.3 -9 682.00 -62.6 -55.4 -62.5 58 -99 SPO 1997 04 03 03 48 97 3.2 -9 682.00 -62.8 -55.4 -62.6 59 -99 SPO 1997 04 03 03 49 97 3.3 -9 682.00 -62.8 -55.5 -62.7 59 -99 SPO 1997 04 03 03 50 96 3.3 -9 682.00 -62.8 -55.3 -62.6 59 -99 SPO 1997 04 03 03 51 99 3.1 -9 682.00 -62.8 -55.2 -62.7 58 -99 SPO 1997 04 03 03 52 98 3.2 -9 682.00 -62.8 -55.1 -62.7 58 -99 SPO 1997 04 03 03 53 96 3.2 -9 682.00 -62.8 -54.8 -62.8 57 -99 SPO 1997 04 03 03 54 95 3.2 -9 681.90 -62.8 -54.5 -62.7 56 -99 SPO 1997 04 03 03 55 96 3.2 -9 681.90 -62.8 -54.3 -62.8 56 -99 SPO 1997 04 03 03 56 97 3.0 -9 681.90 -62.9 -54.2 -62.9 57 -99 SPO 1997 04 03 03 57 95 3.1 -9 681.90 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 03 58 96 3.1 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 03 59 94 3.2 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 00 93 3.3 -9 682.00 -63.0 -54.0 -62.9 57 0 SPO 1997 04 03 04 01 92 3.4 -9 681.90 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 02 91 3.4 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 03 92 3.4 -9 682.00 -63.0 -54.2 -62.9 57 -99 SPO 1997 04 03 04 04 93 3.3 -9 682.00 -63.1 -54.4 -63.0 57 -99 SPO 1997 04 03 04 05 96 3.3 -9 682.00 -63.1 -54.2 -63.0 57 -99 SPO 1997 04 03 04 06 98 3.3 -9 682.00 -63.1 -53.9 -63.0 58 -99 SPO 1997 04 03 04 07 95 3.3 -9 682.00 -62.9 -54.0 -62.9 57 -99 SPO 1997 04 03 04 08 95 3.3 -9 682.00 -62.9 -54.1 -62.9 57 -99 SPO 1997 04 03 04 09 94 3.4 -9 682.00 -63.0 -54.0 -62.9 59 -99 SPO 1997 04 03 04 10 93 3.6 -9 682.00 -62.9 -53.9 -62.8 58 -99 SPO 1997 04 03 04 11 93 3.5 -9 682.00 -62.8 -53.9 -62.8 58 -99 SPO 1997 04 03 04 12 97 3.5 -9 682.00 -62.8 -54.0 -62.8 58 -99 SPO 1997 04 03 04 13 98 3.5 -9 682.00 -62.9 -54.0 -62.9 59 -99 SPO 1997 04 03 04 14 98 3.5 -9 682.00 -62.9 -54.0 -62.9 59 -99 SPO 1997 04 03 04 15 101 3.3 -9 682.00 -62.8 -54.1 -62.8 57 -99 SPO 1997 04 03 04 16 102 3.2 -9 682.00 -62.8 -54.3 -62.9 57 -99 SPO 1997 04 03 04 17 102 3.3 -9 682.00 -62.9 -54.5 -62.9 57 -99 SPO 1997 04 03 04 18 101 3.5 -9 682.00 -62.8 -54.5 -62.9 57 -99 SPO 1997 04 03 04 19 102 3.5 -9 682.00 -62.9 -54.6 -62.9 59 -99 SPO 1997 04 03 04 20 101 3.6 -9 682.00 -62.9 -54.7 -62.9 59 -99 SPO 1997 04 03 04 21 99 3.6 -9 682.00 -62.9 -54.6 -62.9 59 -99 SPO 1997 04 03 04 22 97 3.8 -9 682.00 -62.9 -54.4 -62.9 59 -99 SPO 1997 04 03 04 23 98 3.9 -9 682.00 -62.8 -54.4 -62.8 59 -99 SPO 1997 04 03 04 24 98 3.9 -9 682.10 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 25 96 3.9 -9 682.10 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 26 97 4.0 -9 682.10 -62.6 -54.4 -62.7 58 -99 SPO 1997 04 03 04 27 95 4.1 -9 682.00 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 28 93 4.2 -9 682.10 -62.6 -54.2 -62.6 58 -99 SPO 1997 04 03 04 29 92 4.4 -9 682.00 -62.5 -54.0 -62.5 59 -99 SPO 1997 04 03 04 30 93 4.5 -9 682.00 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 04 31 93 4.5 -9 682.00 -62.3 -53.9 -62.3 58 -99 SPO 1997 04 03 04 32 93 4.5 -9 682.00 -62.3 -53.9 -62.4 58 -99 SPO 1997 04 03 04 33 92 4.7 -9 682.00 -62.3 -53.9 -62.4 59 -99 SPO 1997 04 03 04 34 90 4.8 -9 682.00 -62.4 -54.0 -62.5 60 -99 SPO 1997 04 03 04 35 90 4.8 -9 682.00 -62.4 -53.9 -62.4 60 -99 SPO 1997 04 03 04 36 91 4.8 -9 682.00 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 04 37 92 4.8 -9 682.00 -62.4 -53.8 -62.4 59 -99 SPO 1997 04 03 04 38 92 4.8 -9 682.00 -62.4 -53.9 -62.3 59 -99 SPO 1997 04 03 04 39 91 4.8 -9 682.00 -62.3 -53.9 -62.2 58 -99 SPO 1997 04 03 04 40 91 4.7 -9 682.00 -62.2 -53.9 -62.2 58 -99 SPO 1997 04 03 04 41 91 4.6 -9 682.00 -62.0 -53.9 -62.1 59 -99 SPO 1997 04 03 04 42 91 4.5 -9 682.00 -62.0 -53.9 -62.1 60 -99 SPO 1997 04 03 04 43 90 4.6 -9 682.00 -62.0 -53.8 -62.0 60 -99 SPO 1997 04 03 04 44 90 4.6 -9 682.00 -61.9 -53.8 -62.0 60 -99 SPO 1997 04 03 04 45 89 4.6 -9 682.00 -61.8 -53.8 -61.9 60 -99 SPO 1997 04 03 04 46 90 4.5 -9 682.00 -61.8 -53.8 -61.8 60 -99 SPO 1997 04 03 04 47 90 4.6 -9 682.00 -61.8 -53.9 -61.9 60 -99 SPO 1997 04 03 04 48 91 4.5 -9 682.00 -61.8 -53.9 -61.9 60 -99 SPO 1997 04 03 04 49 92 4.4 -9 682.00 -61.8 -54.0 -61.9 60 -99 SPO 1997 04 03 04 50 93 4.3 -9 682.00 -61.8 -54.2 -61.9 60 -99 SPO 1997 04 03 04 51 93 4.4 -9 682.00 -61.8 -54.2 -61.9 60 -99 SPO 1997 04 03 04 52 93 4.5 -9 682.00 -61.8 -54.3 -61.9 60 -99 SPO 1997 04 03 04 53 92 4.5 -9 682.00 -61.8 -54.2 -61.9 62 -99 SPO 1997 04 03 04 54 92 4.7 -9 682.00 -61.8 -54.1 -61.9 62 -99 SPO 1997 04 03 04 55 92 4.8 -9 682.00 -61.9 -54.0 -61.9 62 -99 SPO 1997 04 03 04 56 91 4.8 -9 682.00 -61.9 -53.9 -62.0 61 -99 SPO 1997 04 03 04 57 92 4.9 -9 682.00 -61.8 -53.8 -61.9 60 -99 SPO 1997 04 03 04 58 92 5.0 -9 682.00 -61.8 -53.7 -61.9 60 -99 SPO 1997 04 03 04 59 91 5.2 -9 682.00 -61.8 -53.7 -61.9 60 -99 SPO 1997 04 03 05 00 91 5.2 -9 681.90 -61.8 -53.6 -61.8 59 0 SPO 1997 04 03 05 01 90 5.3 -9 681.90 -61.8 -53.5 -61.9 59 -99 SPO 1997 04 03 05 02 89 5.4 -9 682.00 -61.8 -53.6 -61.8 59 -99 SPO 1997 04 03 05 03 89 5.5 -9 681.90 -61.8 -53.6 -61.8 59 -99 SPO 1997 04 03 05 04 89 5.4 -9 681.90 -61.8 -53.6 -61.8 60 -99 SPO 1997 04 03 05 05 89 5.2 -9 681.90 -61.8 -53.6 -61.8 60 -99 SPO 1997 04 03 05 06 89 5.1 -9 681.90 -61.7 -53.5 -61.8 61 -99 SPO 1997 04 03 05 07 89 5.0 -9 682.00 -61.7 -53.4 -61.7 62 -99 SPO 1997 04 03 05 08 89 4.9 -9 682.00 -61.6 -53.3 -61.7 61 -99 SPO 1997 04 03 05 09 89 4.9 -9 682.00 -61.6 -53.4 -61.7 62 -99 SPO 1997 04 03 05 10 89 4.9 -9 682.00 -61.6 -53.4 -61.7 62 -99 SPO 1997 04 03 05 11 89 5.0 -9 682.00 -61.6 -53.4 -61.6 62 -99 SPO 1997 04 03 05 12 88 5.0 -9 681.90 -61.5 -53.4 -61.6 61 -99 SPO 1997 04 03 05 13 89 4.8 -9 682.00 -61.5 -53.4 -61.5 61 -99 SPO 1997 04 03 05 14 88 4.8 -9 682.00 -61.4 -53.4 -61.5 60 -99 SPO 1997 04 03 05 15 88 4.8 -9 682.00 -61.4 -53.2 -61.5 61 -99 SPO 1997 04 03 05 16 88 4.8 -9 682.00 -61.4 -53.1 -61.5 61 -99 SPO 1997 04 03 05 17 88 4.7 -9 682.00 -61.4 -53.1 -61.5 61 -99 SPO 1997 04 03 05 18 89 4.6 -9 682.00 -61.4 -53.3 -61.5 61 -99 SPO 1997 04 03 05 19 90 4.6 -9 682.10 -61.4 -53.6 -61.5 61 -99 SPO 1997 04 03 05 20 90 4.6 -9 682.10 -61.4 -53.7 -61.5 61 -99 SPO 1997 04 03 05 21 90 4.7 -9 682.00 -61.4 -53.8 -61.5 61 -99 SPO 1997 04 03 05 22 89 4.8 -9 682.00 -61.4 -53.8 -61.5 60 -99 SPO 1997 04 03 05 23 89 4.9 -9 682.00 -61.5 -53.9 -61.6 61 -99 SPO 1997 04 03 05 24 89 4.9 -9 682.00 -61.5 -54.0 -61.6 60 -99 SPO 1997 04 03 05 25 88 4.9 -9 682.00 -61.5 -54.1 -61.6 60 -99 SPO 1997 04 03 05 26 88 4.8 -9 682.00 -61.5 -54.2 -61.6 60 -99 SPO 1997 04 03 05 27 89 4.7 -9 682.00 -61.6 -54.3 -61.6 62 -99 SPO 1997 04 03 05 28 89 4.6 -9 682.00 -61.6 -54.3 -61.7 62 -99 SPO 1997 04 03 05 29 89 4.5 -9 682.00 -61.6 -54.4 -61.7 62 -99 SPO 1997 04 03 05 30 90 4.5 -9 682.00 -61.6 -54.4 -61.6 62 -99 SPO 1997 04 03 05 31 90 4.4 -9 682.00 -61.6 -54.5 -61.6 62 -99 SPO 1997 04 03 05 32 91 4.5 -9 682.10 -61.5 -54.5 -61.6 61 -99 SPO 1997 04 03 05 33 91 4.5 -9 682.10 -61.6 -54.7 -61.6 61 -99 SPO 1997 04 03 05 34 90 4.6 -9 682.00 -61.6 -54.8 -61.7 61 -99 SPO 1997 04 03 05 35 90 4.6 -9 682.10 -61.6 -54.7 -61.7 61 -99 SPO 1997 04 03 05 36 91 4.6 -9 682.10 -61.6 -54.7 -61.7 61 -99 SPO 1997 04 03 05 37 92 4.6 -9 682.10 -61.7 -54.7 -61.7 62 -99 SPO 1997 04 03 05 38 93 4.5 -9 682.10 -61.7 -54.7 -61.7 62 -99 SPO 1997 04 03 05 39 93 4.6 -9 682.10 -61.7 -54.6 -61.7 62 -99 SPO 1997 04 03 05 40 94 4.6 -9 682.00 -61.7 -54.5 -61.8 62 -99 SPO 1997 04 03 05 41 94 4.6 -9 682.10 -61.7 -54.5 -61.8 62 -99 SPO 1997 04 03 05 42 95 4.5 -9 682.10 -61.8 -54.4 -61.8 62 -99 SPO 1997 04 03 05 43 95 4.4 -9 682.10 -61.8 -54.2 -61.7 62 -99 SPO 1997 04 03 05 44 96 4.3 -9 682.10 -61.7 -54.1 -61.7 62 -99 SPO 1997 04 03 05 45 98 4.2 -9 682.10 -61.7 -54.2 -61.8 61 -99 SPO 1997 04 03 05 46 99 4.1 -9 682.10 -61.7 -54.2 -61.8 59 -99 SPO 1997 04 03 05 47 99 4.0 -9 682.10 -61.8 -54.0 -61.8 60 -99 SPO 1997 04 03 05 48 99 4.2 -9 682.10 -61.8 -53.8 -61.8 59 -99 SPO 1997 04 03 05 49 99 4.2 -9 682.10 -61.8 -53.8 -61.8 59 -99 SPO 1997 04 03 05 50 98 4.3 -9 682.10 -61.9 -53.9 -61.9 60 -99 SPO 1997 04 03 05 51 96 4.5 -9 682.10 -62.0 -53.9 -62.0 61 -99 SPO 1997 04 03 05 52 96 4.5 -9 682.10 -62.0 -54.0 -62.1 61 -99 SPO 1997 04 03 05 53 95 4.6 -9 682.10 -62.2 -53.9 -62.2 61 -99 SPO 1997 04 03 05 54 95 4.6 -9 682.10 -62.2 -53.8 -62.3 61 -99 SPO 1997 04 03 05 55 96 4.6 -9 682.10 -62.4 -53.9 -62.4 62 -99 SPO 1997 04 03 05 56 97 4.6 -9 682.10 -62.4 -54.0 -62.4 60 -99 SPO 1997 04 03 05 57 98 4.6 -9 682.10 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 05 58 98 4.6 -9 682.10 -62.5 -54.0 -62.4 60 -99 SPO 1997 04 03 05 59 98 4.6 -9 682.10 -62.5 -54.0 -62.4 60 -99 SPO 1997 04 03 06 00 96 4.7 -9 682.10 -62.5 -53.9 -62.4 60 0 SPO 1997 04 03 06 01 96 4.6 -9 682.10 -62.5 -53.8 -62.4 60 -99 SPO 1997 04 03 06 02 96 4.5 -9 682.10 -62.4 -53.6 -62.4 59 -99 SPO 1997 04 03 06 03 97 4.5 -9 682.10 -62.4 -53.6 -62.3 60 -99 SPO 1997 04 03 06 04 98 4.5 -9 682.10 -62.3 -53.6 -62.3 59 -99 SPO 1997 04 03 06 05 98 4.4 -9 682.10 -62.4 -53.7 -62.3 60 -99 SPO 1997 04 03 06 06 99 4.3 -9 682.10 -62.3 -53.8 -62.3 59 -99 SPO 1997 04 03 06 07 99 4.3 -9 682.10 -62.3 -53.9 -62.3 59 -99 SPO 1997 04 03 06 08 98 4.3 -9 682.10 -62.3 -54.0 -62.3 58 -99 SPO 1997 04 03 06 09 98 4.4 -9 682.10 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 10 97 4.5 -9 682.20 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 11 96 4.6 -9 682.10 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 12 94 4.6 -9 682.10 -62.2 -54.0 -62.3 58 -99 SPO 1997 04 03 06 13 94 4.6 -9 682.10 -62.3 -53.9 -62.4 58 -99 SPO 1997 04 03 06 14 95 4.6 -9 682.10 -62.3 -54.0 -62.4 59 -99 SPO 1997 04 03 06 15 97 4.5 -9 682.10 -62.4 -54.3 -62.4 60 -99 SPO 1997 04 03 06 16 99 4.4 -9 682.10 -62.4 -55.0 -62.4 59 -99 SPO 1997 04 03 06 17 99 4.4 -9 682.10 -62.5 -55.8 -62.5 60 -99 SPO 1997 04 03 06 18 99 4.5 -9 682.20 -62.5 -56.2 -62.5 59 -99 SPO 1997 04 03 06 19 100 4.5 -9 682.10 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 06 20 100 4.6 -9 682.10 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 06 21 100 4.6 -9 682.10 -62.6 -56.5 -62.6 58 -99 SPO 1997 04 03 06 22 98 4.7 -9 682.10 -62.7 -56.4 -62.6 58 -99 SPO 1997 04 03 06 23 97 4.8 -9 682.10 -62.8 -56.3 -62.6 58 -99 SPO 1997 04 03 06 24 97 4.9 -9 682.10 -62.7 -56.3 -62.6 58 -99 SPO 1997 04 03 06 25 96 5.0 -9 682.10 -62.6 -56.4 -62.7 58 -99 SPO 1997 04 03 06 26 93 5.1 -9 682.10 -62.7 -56.4 -62.7 59 -99 SPO 1997 04 03 06 27 93 5.2 -9 682.10 -62.7 -56.4 -62.8 58 -99 SPO 1997 04 03 06 28 94 5.3 -9 682.20 -62.7 -56.4 -62.7 59 -99 SPO 1997 04 03 06 29 94 5.4 -9 682.20 -62.7 -56.5 -62.6 59 -99 SPO 1997 04 03 06 30 93 5.4 -9 682.20 -62.6 -56.5 -62.6 58 -99 SPO 1997 04 03 06 31 93 5.5 -9 682.20 -62.5 -56.4 -62.5 57 -99 SPO 1997 04 03 06 32 94 5.5 -9 682.20 -62.4 -56.4 -62.4 58 -99 SPO 1997 04 03 06 33 95 5.4 -9 682.20 -62.3 -56.5 -62.3 58 -99 SPO 1997 04 03 06 34 94 5.4 -9 682.10 -62.3 -56.7 -62.3 58 -99 SPO 1997 04 03 06 35 93 5.4 -9 682.10 -62.3 -56.8 -62.3 58 -99 SPO 1997 04 03 06 36 91 5.4 -9 682.10 -62.3 -56.7 -62.3 61 -99 SPO 1997 04 03 06 37 90 5.5 -9 682.10 -62.2 -56.4 -62.2 61 -99 SPO 1997 04 03 06 38 91 5.5 -9 682.10 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 39 92 5.5 -9 682.10 -62.1 -56.2 -62.2 61 -99 SPO 1997 04 03 06 40 92 5.5 -9 682.10 -62.0 -56.4 -62.1 61 -99 SPO 1997 04 03 06 41 92 5.4 -9 682.10 -62.0 -56.5 -62.1 61 -99 SPO 1997 04 03 06 42 93 5.4 -9 682.10 -62.0 -56.6 -62.1 61 -99 SPO 1997 04 03 06 43 93 5.4 -9 682.20 -61.9 -56.8 -62.1 60 -99 SPO 1997 04 03 06 44 91 5.4 -9 682.10 -62.0 -56.9 -62.1 60 -99 SPO 1997 04 03 06 45 91 5.5 -9 682.10 -62.0 -56.8 -62.2 60 -99 SPO 1997 04 03 06 46 92 5.6 -9 682.10 -62.0 -56.6 -62.2 60 -99 SPO 1997 04 03 06 47 93 5.6 -9 682.20 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 48 95 5.4 -9 682.20 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 49 96 5.3 -9 682.20 -62.0 -56.4 -62.2 60 -99 SPO 1997 04 03 06 50 97 5.2 -9 682.20 -62.1 -56.6 -62.2 61 -99 SPO 1997 04 03 06 51 97 5.2 -9 682.20 -62.2 -56.5 -62.2 61 -99 SPO 1997 04 03 06 52 97 5.1 -9 682.20 -62.2 -56.1 -62.2 61 -99 SPO 1997 04 03 06 53 97 5.1 -9 682.20 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 06 54 97 4.9 -9 682.20 -62.2 -55.6 -62.2 61 -99 SPO 1997 04 03 06 55 98 5.0 -9 682.20 -62.2 -55.5 -62.2 61 -99 SPO 1997 04 03 06 56 100 4.9 -9 682.20 -62.2 -55.6 -62.2 61 -99 SPO 1997 04 03 06 57 101 4.9 -9 682.30 -62.1 -55.7 -62.2 60 -99 SPO 1997 04 03 06 58 101 4.9 -9 682.30 -62.2 -55.7 -62.3 61 -99 SPO 1997 04 03 06 59 100 4.9 -9 682.30 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 07 00 101 4.9 -9 682.30 -62.2 -55.7 -62.2 61 0 SPO 1997 04 03 07 01 101 4.9 -9 682.30 -62.2 -55.7 -62.3 61 -99 SPO 1997 04 03 07 02 102 4.8 -9 682.30 -62.3 -55.8 -62.4 59 -99 SPO 1997 04 03 07 03 103 4.9 -9 682.30 -62.4 -55.8 -62.4 59 -99 SPO 1997 04 03 07 04 103 4.8 -9 682.30 -62.4 -56.0 -62.5 59 -99 SPO 1997 04 03 07 05 105 4.7 -9 682.30 -62.5 -56.0 -62.6 59 -99 SPO 1997 04 03 07 06 106 4.6 -9 682.40 -62.6 -56.2 -62.6 58 -99 SPO 1997 04 03 07 07 108 4.4 -9 682.40 -62.8 -56.4 -62.7 59 -99 SPO 1997 04 03 07 08 108 4.3 -9 682.40 -62.8 -56.6 -62.8 58 -99 SPO 1997 04 03 07 09 108 4.4 -9 682.40 -62.9 -56.7 -63.0 59 -99 SPO 1997 04 03 07 10 109 4.4 -9 682.40 -63.0 -56.7 -63.0 59 -99 SPO 1997 04 03 07 11 109 4.5 -9 682.40 -63.0 -56.9 -63.0 59 -99 SPO 1997 04 03 07 12 107 4.7 -9 682.40 -63.0 -57.0 -63.0 59 -99 SPO 1997 04 03 07 13 105 4.8 -9 682.40 -63.0 -56.7 -62.9 59 -99 SPO 1997 04 03 07 14 104 4.9 -9 682.40 -63.0 -56.5 -62.9 60 -99 SPO 1997 04 03 07 15 104 5.0 -9 682.40 -63.0 -56.3 -62.9 60 -99 SPO 1997 04 03 07 16 103 4.9 -9 682.40 -63.0 -56.1 -63.0 60 -99 SPO 1997 04 03 07 17 104 4.8 -9 682.40 -63.0 -55.9 -63.0 59 -99 SPO 1997 04 03 07 18 105 4.7 -9 682.40 -63.0 -55.9 -62.9 57 -99 SPO 1997 04 03 07 19 106 4.6 -9 682.40 -62.9 -56.1 -62.9 57 -99 SPO 1997 04 03 07 20 107 4.5 -9 682.40 -62.9 -56.3 -62.9 57 -99 SPO 1997 04 03 07 21 107 4.5 -9 682.40 -62.8 -56.6 -62.8 57 -99 SPO 1997 04 03 07 22 107 4.4 -9 682.40 -62.8 -56.6 -62.7 58 -99 SPO 1997 04 03 07 23 107 4.3 -9 682.40 -62.8 -56.8 -62.6 59 -99 SPO 1997 04 03 07 24 107 4.2 -9 682.40 -62.7 -56.8 -62.6 58 -99 SPO 1997 04 03 07 25 107 4.2 -9 682.40 -62.6 -56.7 -62.6 58 -99 SPO 1997 04 03 07 26 107 4.2 -9 682.40 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 07 27 106 4.2 -9 682.40 -62.5 -56.7 -62.6 59 -99 SPO 1997 04 03 07 28 104 4.2 -9 682.40 -62.6 -56.5 -62.7 60 -99 SPO 1997 04 03 07 29 103 4.2 -9 682.40 -62.7 -56.3 -62.8 58 -99 SPO 1997 04 03 07 30 103 4.2 -9 682.40 -62.7 -56.3 -62.8 58 -99 SPO 1997 04 03 07 31 103 4.3 -9 682.40 -62.7 -56.2 -62.8 58 -99 SPO 1997 04 03 07 32 102 4.4 -9 682.40 -62.7 -56.0 -62.8 57 -99 SPO 1997 04 03 07 33 102 4.4 -9 682.40 -62.7 -56.0 -62.8 57 -99 SPO 1997 04 03 07 34 100 4.4 -9 682.40 -62.7 -55.9 -62.7 59 -99 SPO 1997 04 03 07 35 98 4.5 -9 682.40 -62.6 -56.0 -62.7 60 -99 SPO 1997 04 03 07 36 98 4.6 -9 682.40 -62.7 -56.0 -62.6 61 -99 SPO 1997 04 03 07 37 97 4.6 -9 682.40 -62.6 -55.9 -62.6 61 -99 SPO 1997 04 03 07 38 97 4.6 -9 682.40 -62.6 -56.0 -62.6 61 -99 SPO 1997 04 03 07 39 98 4.5 -9 682.40 -62.6 -56.0 -62.6 61 -99 SPO 1997 04 03 07 40 99 4.4 -9 682.40 -62.5 -56.2 -62.6 61 -99 SPO 1997 04 03 07 41 102 4.4 -9 682.40 -62.4 -56.4 -62.6 59 -99 SPO 1997 04 03 07 42 103 4.5 -9 682.50 -62.5 -56.8 -62.6 60 -99 SPO 1997 04 03 07 43 104 4.5 -9 682.50 -62.5 -57.2 -62.6 60 -99 SPO 1997 04 03 07 44 104 4.6 -9 682.50 -62.6 -57.5 -62.7 60 -99 SPO 1997 04 03 07 45 104 4.6 -9 682.50 -62.6 -57.6 -62.7 60 -99 SPO 1997 04 03 07 46 107 4.6 -9 682.50 -62.6 -57.8 -62.7 60 -99 SPO 1997 04 03 07 47 107 4.5 -9 682.50 -62.6 -58.0 -62.7 60 -99 SPO 1997 04 03 07 48 107 4.7 -9 682.50 -62.6 -58.2 -62.7 58 -99 SPO 1997 04 03 07 49 108 4.7 -9 682.50 -62.6 -58.4 -62.7 60 -99 SPO 1997 04 03 07 50 107 4.7 -9 682.50 -62.6 -58.6 -62.7 60 -99 SPO 1997 04 03 07 51 106 4.8 -9 682.50 -62.7 -58.6 -62.7 59 -99 SPO 1997 04 03 07 52 103 4.9 -9 682.50 -62.7 -58.3 -62.6 58 -99 SPO 1997 04 03 07 53 103 5.0 -9 682.50 -62.7 -58.2 -62.6 59 -99 SPO 1997 04 03 07 54 104 5.0 -9 682.50 -62.6 -58.3 -62.7 57 -99 SPO 1997 04 03 07 55 105 4.9 -9 682.50 -62.6 -58.4 -62.7 57 -99 SPO 1997 04 03 07 56 103 4.9 -9 682.40 -62.6 -58.5 -62.7 57 -99 SPO 1997 04 03 07 57 101 4.9 -9 682.50 -62.7 -58.4 -62.8 61 -99 SPO 1997 04 03 07 58 100 4.8 -9 682.50 -62.7 -58.4 -62.8 61 -99 SPO 1997 04 03 07 59 99 4.9 -9 682.50 -62.7 -58.2 -62.8 59 -99 SPO 1997 04 03 08 00 99 4.9 -9 682.50 -62.7 -58.2 -62.8 58 0 SPO 1997 04 03 08 01 99 4.9 -9 682.50 -62.8 -58.1 -62.8 59 -99 SPO 1997 04 03 08 02 99 5.0 -9 682.50 -62.8 -57.9 -62.8 58 -99 SPO 1997 04 03 08 03 99 5.0 -9 682.50 -62.8 -57.6 -62.8 58 -99 SPO 1997 04 03 08 04 98 5.0 -9 682.40 -62.7 -57.3 -62.8 57 -99 SPO 1997 04 03 08 05 97 5.0 -9 682.40 -62.7 -57.2 -62.7 58 -99 SPO 1997 04 03 08 06 98 5.2 -9 682.40 -62.7 -57.2 -62.6 59 -99 SPO 1997 04 03 08 07 97 5.1 -9 682.40 -62.7 -56.8 -62.6 61 -99 SPO 1997 04 03 08 08 96 5.0 -9 682.40 -62.6 -56.5 -62.6 61 -99 SPO 1997 04 03 08 09 96 5.0 -9 682.40 -62.6 -56.4 -62.5 61 -99 SPO 1997 04 03 08 10 95 5.1 -9 682.40 -62.4 -56.3 -62.5 62 -99 SPO 1997 04 03 08 11 94 5.0 -9 682.40 -62.4 -56.0 -62.5 62 -99 SPO 1997 04 03 08 12 94 5.0 -9 682.40 -62.4 -55.6 -62.5 62 -99 SPO 1997 04 03 08 13 93 5.1 -9 682.40 -62.4 -55.4 -62.5 63 -99 SPO 1997 04 03 08 14 92 5.2 -9 682.40 -62.4 -55.2 -62.5 62 -99 SPO 1997 04 03 08 15 91 5.3 -9 682.40 -62.4 -55.0 -62.4 62 -99 SPO 1997 04 03 08 16 91 5.4 -9 682.40 -62.3 -54.8 -62.4 61 -99 SPO 1997 04 03 08 17 91 5.5 -9 682.40 -62.3 -54.5 -62.4 59 -99 SPO 1997 04 03 08 18 91 5.5 -9 682.40 -62.2 -54.2 -62.3 58 -99 SPO 1997 04 03 08 19 91 5.5 -9 682.40 -62.2 -54.1 -62.3 58 -99 SPO 1997 04 03 08 20 92 5.4 -9 682.40 -62.2 -54.0 -62.3 58 -99 SPO 1997 04 03 08 21 93 5.3 -9 682.40 -62.2 -54.1 -62.2 61 -99 SPO 1997 04 03 08 22 93 5.3 -9 682.40 -62.2 -54.2 -62.2 61 -99 SPO 1997 04 03 08 23 92 5.3 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 24 92 5.3 -9 682.40 -62.2 -54.4 -62.2 61 -99 SPO 1997 04 03 08 25 90 5.4 -9 682.40 -62.2 -54.5 -62.2 61 -99 SPO 1997 04 03 08 26 92 5.4 -9 682.40 -62.2 -54.3 -62.2 61 -99 SPO 1997 04 03 08 27 92 5.3 -9 682.40 -62.1 -54.4 -62.2 60 -99 SPO 1997 04 03 08 28 90 5.4 -9 682.40 -62.0 -54.4 -62.2 59 -99 SPO 1997 04 03 08 29 91 5.4 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 30 90 5.4 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 31 90 5.4 -9 682.40 -62.1 -54.2 -62.2 61 -99 SPO 1997 04 03 08 32 91 5.5 -9 682.40 -62.1 -54.1 -62.2 61 -99 SPO 1997 04 03 08 33 90 5.7 -9 682.40 -62.1 -54.1 -62.2 61 -99 SPO 1997 04 03 08 34 89 5.7 -9 682.40 -62.1 -54.2 -62.2 61 -99 SPO 1997 04 03 08 35 89 5.7 -9 682.40 -62.1 -54.2 -62.1 61 -99 SPO 1997 04 03 08 36 90 5.7 -9 682.40 -62.1 -54.3 -62.1 61 -99 SPO 1997 04 03 08 37 90 5.5 -9 682.40 -62.1 -54.4 -62.1 61 -99 SPO 1997 04 03 08 38 90 5.6 -9 682.40 -62.1 -54.5 -62.1 61 -99 SPO 1997 04 03 08 39 89 5.7 -9 682.40 -62.1 -54.4 -62.1 60 -99 SPO 1997 04 03 08 40 89 5.7 -9 682.40 -62.0 -54.4 -62.0 59 -99 SPO 1997 04 03 08 41 90 5.6 -9 682.40 -62.0 -54.6 -62.0 59 -99 SPO 1997 04 03 08 42 89 5.6 -9 682.40 -62.0 -54.6 -62.0 60 -99 SPO 1997 04 03 08 43 88 5.6 -9 682.40 -61.9 -54.7 -62.1 59 -99 SPO 1997 04 03 08 44 89 5.6 -9 682.40 -61.9 -54.6 -62.0 59 -99 SPO 1997 04 03 08 45 89 5.7 -9 682.40 -61.9 -54.6 -62.0 61 -99 SPO 1997 04 03 08 46 88 5.6 -9 682.40 -61.9 -54.5 -62.0 61 -99 SPO 1997 04 03 08 47 88 5.6 -9 682.40 -61.9 -54.5 -62.0 61 -99 SPO 1997 04 03 08 48 89 5.5 -9 682.40 -61.9 -54.6 -62.0 61 -99 SPO 1997 04 03 08 49 90 5.3 -9 682.50 -62.0 -54.8 -62.0 61 -99 SPO 1997 04 03 08 50 93 5.2 -9 682.50 -62.0 -55.2 -62.2 61 -99 SPO 1997 04 03 08 51 95 5.1 -9 682.50 -62.1 -56.0 -62.2 61 -99 SPO 1997 04 03 08 52 97 5.0 -9 682.50 -62.2 -56.6 -62.3 61 -99 SPO 1997 04 03 08 53 98 5.0 -9 682.50 -62.3 -57.0 -62.3 59 -99 SPO 1997 04 03 08 54 99 4.9 -9 682.50 -62.3 -57.4 -62.3 58 -99 SPO 1997 04 03 08 55 101 4.8 -9 682.50 -62.4 -57.6 -62.4 59 -99 SPO 1997 04 03 08 56 103 4.8 -9 682.50 -62.3 -57.9 -62.4 58 -99 SPO 1997 04 03 08 57 103 4.9 -9 682.50 -62.4 -58.0 -62.5 59 -99 SPO 1997 04 03 08 58 102 4.9 -9 682.50 -62.5 -58.0 -62.5 60 -99 SPO 1997 04 03 08 59 103 4.9 -9 682.50 -62.5 -57.9 -62.6 60 -99 SPO 1997 04 03 09 00 104 4.7 -9 682.50 -62.6 -58.0 -62.6 61 0 SPO 1997 04 03 09 01 107 4.5 -9 682.50 -62.6 -58.2 -62.6 61 -99 SPO 1997 04 03 09 02 108 4.4 -9 682.50 -62.7 -58.5 -62.7 59 -99 SPO 1997 04 03 09 03 110 4.3 -9 682.50 -62.8 -58.8 -62.8 59 -99 SPO 1997 04 03 09 04 112 4.1 -9 682.50 -63.0 -59.0 -63.0 60 -99 SPO 1997 04 03 09 05 112 4.0 -9 682.60 -63.1 -59.1 -63.1 58 -99 SPO 1997 04 03 09 06 113 3.9 -9 682.60 -63.2 -59.2 -63.1 57 -99 SPO 1997 04 03 09 07 116 3.8 -9 682.60 -63.3 -59.3 -63.2 58 -99 SPO 1997 04 03 09 08 114 4.0 -9 682.60 -63.3 -59.3 -63.2 58 -99 SPO 1997 04 03 09 09 111 4.2 -9 682.60 -63.3 -59.3 -63.2 59 -99 SPO 1997 04 03 09 10 110 4.1 -9 682.60 -63.3 -59.3 -63.2 59 -99 SPO 1997 04 03 09 11 110 4.1 -9 682.60 -63.3 -59.3 -63.2 60 -99 SPO 1997 04 03 09 12 111 4.0 -9 682.60 -63.2 -59.3 -63.2 59 -99 SPO 1997 04 03 09 13 111 4.3 -9 682.60 -63.2 -59.3 -63.1 58 -99 SPO 1997 04 03 09 14 110 4.4 -9 682.60 -63.1 -59.3 -63.1 57 -99 SPO 1997 04 03 09 15 109 4.5 -9 682.60 -63.0 -59.2 -63.0 57 -99 SPO 1997 04 03 09 16 110 4.5 -9 682.60 -63.0 -59.2 -62.9 57 -99 SPO 1997 04 03 09 17 111 4.5 -9 682.60 -62.9 -59.3 -62.9 56 -99 SPO 1997 04 03 09 18 110 4.6 -9 682.60 -62.9 -59.4 -62.9 57 -99 SPO 1997 04 03 09 19 108 4.6 -9 682.60 -62.9 -59.4 -63.0 57 -99 SPO 1997 04 03 09 20 109 4.6 -9 682.70 -62.9 -59.4 -63.0 59 -99 SPO 1997 04 03 09 21 111 4.5 -9 682.70 -63.0 -59.5 -63.0 60 -99 SPO 1997 04 03 09 22 109 4.6 -9 682.70 -63.0 -59.5 -63.1 60 -99 SPO 1997 04 03 09 23 108 4.5 -9 682.70 -63.0 -59.5 -63.0 60 -99 SPO 1997 04 03 09 24 107 4.6 -9 682.60 -62.9 -59.4 -63.0 59 -99 SPO 1997 04 03 09 25 106 4.7 -9 682.70 -62.8 -59.4 -62.9 58 -99 SPO 1997 04 03 09 26 105 4.9 -9 682.70 -62.9 -59.4 -62.9 59 -99 SPO 1997 04 03 09 27 105 4.9 -9 682.60 -62.8 -59.4 -62.9 58 -99 SPO 1997 04 03 09 28 104 5.0 -9 682.60 -62.8 -59.4 -62.8 59 -99 SPO 1997 04 03 09 29 104 5.0 -9 682.60 -62.7 -59.4 -62.8 58 -99 SPO 1997 04 03 09 30 104 5.1 -9 682.70 -62.7 -59.4 -62.7 61 -99 SPO 1997 04 03 09 31 104 5.1 -9 682.70 -62.6 -59.4 -62.7 61 -99 SPO 1997 04 03 09 32 104 5.1 -9 682.60 -62.6 -59.3 -62.6 61 -99 SPO 1997 04 03 09 33 104 5.2 -9 682.70 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 34 103 5.2 -9 682.70 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 35 103 5.2 -9 682.60 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 36 103 5.3 -9 682.60 -62.5 -59.5 -62.6 61 -99 SPO 1997 04 03 09 37 103 5.3 -9 682.60 -62.5 -59.5 -62.6 63 -99 SPO 1997 04 03 09 38 103 5.4 -9 682.60 -62.5 -59.5 -62.6 61 -99 SPO 1997 04 03 09 39 100 5.4 -9 682.60 -62.5 -59.4 -62.5 61 -99 SPO 1997 04 03 09 40 97 5.4 -9 682.60 -62.4 -59.1 -62.4 62 -99 SPO 1997 04 03 09 41 97 5.5 -9 682.60 -62.3 -58.9 -62.4 59 -99 SPO 1997 04 03 09 42 96 5.6 -9 682.60 -62.2 -58.6 -62.4 61 -99 SPO 1997 04 03 09 43 94 5.7 -9 682.60 -62.2 -58.2 -62.4 61 -99 SPO 1997 04 03 09 44 93 5.7 -9 682.60 -62.3 -57.9 -62.4 62 -99 SPO 1997 04 03 09 45 93 5.8 -9 682.60 -62.3 -57.8 -62.4 62 -99 SPO 1997 04 03 09 46 92 5.7 -9 682.60 -62.3 -57.6 -62.4 62 -99 SPO 1997 04 03 09 47 92 5.7 -9 682.50 -62.3 -57.4 -62.4 62 -99 SPO 1997 04 03 09 48 91 5.8 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 49 91 5.9 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 50 90 5.9 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 51 89 5.9 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 52 89 6.0 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 53 89 6.2 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 54 89 6.2 -9 682.50 -62.4 -57.5 -62.5 63 -99 SPO 1997 04 03 09 55 89 6.2 -9 682.50 -62.4 -57.5 -62.4 63 -99 SPO 1997 04 03 09 56 88 6.2 -9 682.50 -62.4 -57.6 -62.4 63 -99 SPO 1997 04 03 09 57 88 6.2 -9 682.50 -62.2 -57.6 -62.4 61 -99 SPO 1997 04 03 09 58 88 6.1 -9 682.50 -62.2 -57.6 -62.4 61 -99 SPO 1997 04 03 09 59 88 6.1 -9 682.50 -62.3 -57.6 -62.4 63 -99 SPO 1997 04 03 10 00 89 6.1 -9 682.50 -62.3 -57.7 -62.4 63 0 SPO 1997 04 03 10 01 89 6.1 -9 682.50 -62.3 -57.8 -62.4 62 -99 SPO 1997 04 03 10 02 89 6.1 -9 682.50 -62.3 -57.9 -62.4 62 -99 SPO 1997 04 03 10 03 87 6.2 -9 682.50 -62.3 -57.9 -62.4 61 -99 SPO 1997 04 03 10 04 88 6.1 -9 682.50 -62.3 -57.9 -62.5 61 -99 SPO 1997 04 03 10 05 88 6.0 -9 682.50 -62.3 -58.0 -62.5 59 -99 SPO 1997 04 03 10 06 88 5.9 -9 682.50 -62.4 -58.0 -62.5 62 -99 SPO 1997 04 03 10 07 90 5.8 -9 682.60 -62.5 -58.4 -62.5 63 -99 SPO 1997 04 03 10 08 91 5.6 -9 682.60 -62.5 -58.9 -62.5 64 -99 SPO 1997 04 03 10 09 91 5.5 -9 682.60 -62.6 -59.2 -62.6 65 -99 SPO 1997 04 03 10 10 92 5.4 -9 682.60 -62.6 -59.4 -62.6 64 -99 SPO 1997 04 03 10 11 92 5.4 -9 682.60 -62.6 -59.5 -62.7 64 -99 SPO 1997 04 03 10 12 91 5.4 -9 682.50 -62.6 -59.6 -62.8 61 -99 SPO 1997 04 03 10 13 91 5.3 -9 682.50 -62.7 -59.6 -62.8 61 -99 SPO 1997 04 03 10 14 91 5.2 -9 682.50 -62.8 -59.7 -62.9 61 -99 SPO 1997 04 03 10 15 91 5.0 -9 682.50 -62.8 -59.7 -63.0 60 -99 SPO 1997 04 03 10 16 91 5.0 -9 682.50 -62.9 -59.8 -63.0 60 -99 SPO 1997 04 03 10 17 91 4.8 -9 682.50 -62.9 -59.8 -63.0 60 -99 SPO 1997 04 03 10 18 91 4.8 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 19 92 4.8 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 20 92 4.7 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 21 93 4.6 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 22 92 4.6 -9 682.60 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 23 92 4.6 -9 682.50 -63.0 -59.8 -63.1 60 -99 SPO 1997 04 03 10 24 92 4.7 -9 682.50 -63.0 -59.7 -63.1 60 -99 SPO 1997 04 03 10 25 92 4.8 -9 682.60 -63.0 -59.6 -63.1 60 -99 SPO 1997 04 03 10 26 92 4.9 -9 682.60 -63.1 -59.5 -63.1 60 -99 SPO 1997 04 03 10 27 93 5.0 -9 682.60 -63.1 -59.1 -63.1 60 -99 SPO 1997 04 03 10 28 94 4.9 -9 682.60 -63.1 -58.7 -63.1 60 -99 SPO 1997 04 03 10 29 95 4.9 -9 682.60 -63.1 -58.6 -63.2 60 -99 SPO 1997 04 03 10 30 97 4.9 -9 682.60 -63.1 -58.8 -63.2 60 -99 SPO 1997 04 03 10 31 97 4.9 -9 682.60 -63.1 -58.7 -63.2 60 -99 SPO 1997 04 03 10 32 100 5.0 -9 682.60 -63.1 -58.5 -63.2 60 -99 SPO 1997 04 03 10 33 101 5.2 -9 682.60 -63.1 -58.5 -63.2 60 -99 SPO 1997 04 03 10 34 99 5.2 -9 682.60 -63.1 -58.2 -63.2 60 -99 SPO 1997 04 03 10 35 99 5.3 -9 682.60 -63.1 -58.0 -63.2 60 -99 SPO 1997 04 03 10 36 98 5.3 -9 682.60 -63.1 -57.8 -63.1 60 -99 SPO 1997 04 03 10 37 97 5.3 -9 682.60 -63.0 -57.6 -63.1 60 -99 SPO 1997 04 03 10 38 99 5.2 -9 682.60 -63.0 -57.4 -63.0 60 -99 SPO 1997 04 03 10 39 99 5.1 -9 682.60 -62.9 -57.4 -63.0 59 -99 SPO 1997 04 03 10 40 99 5.0 -9 682.60 -62.8 -57.3 -62.9 59 -99 SPO 1997 04 03 10 41 101 5.0 -9 682.60 -62.8 -57.4 -62.9 59 -99 SPO 1997 04 03 10 42 102 5.0 -9 682.60 -62.8 -57.5 -62.9 60 -99 SPO 1997 04 03 10 43 101 5.0 -9 682.60 -62.8 -57.6 -62.9 61 -99 SPO 1997 04 03 10 44 102 5.0 -9 682.60 -62.8 -57.7 -63.0 61 -99 SPO 1997 04 03 10 45 102 5.0 -9 682.60 -62.8 -57.8 -62.9 62 -99 SPO 1997 04 03 10 46 103 5.0 -9 682.60 -62.8 -57.8 -62.9 62 -99 SPO 1997 04 03 10 47 103 5.0 -9 682.60 -62.8 -58.0 -62.9 61 -99 SPO 1997 04 03 10 48 104 5.0 -9 682.60 -62.8 -58.0 -62.8 61 -99 SPO 1997 04 03 10 49 103 5.0 -9 682.60 -62.7 -58.0 -62.8 59 -99 SPO 1997 04 03 10 50 101 5.0 -9 682.60 -62.6 -57.9 -62.7 60 -99 SPO 1997 04 03 10 51 100 5.0 -9 682.60 -62.6 -57.8 -62.7 60 -99 SPO 1997 04 03 10 52 100 5.0 -9 682.70 -62.6 -57.7 -62.7 61 -99 SPO 1997 04 03 10 53 100 4.9 -9 682.60 -62.6 -57.6 -62.6 61 -99 SPO 1997 04 03 10 54 102 4.8 -9 682.60 -62.6 -57.6 -62.6 64 -99 SPO 1997 04 03 10 55 103 4.8 -9 682.70 -62.6 -57.9 -62.6 65 -99 SPO 1997 04 03 10 56 103 4.7 -9 682.70 -62.6 -58.4 -62.6 65 -99 SPO 1997 04 03 10 57 102 4.6 -9 682.70 -62.5 -58.7 -62.7 64 -99 SPO 1997 04 03 10 58 102 4.5 -9 682.70 -62.5 -58.6 -62.6 64 -99 SPO 1997 04 03 10 59 102 4.5 -9 682.70 -62.6 -58.4 -62.6 64 -99 SPO 1997 04 03 11 00 102 4.4 -9 682.70 -62.6 -58.5 -62.7 64 0 SPO 1997 04 03 11 01 103 4.4 -9 682.70 -62.6 -58.7 -62.7 61 -99 SPO 1997 04 03 11 02 102 4.5 -9 682.70 -62.6 -58.8 -62.7 61 -99 SPO 1997 04 03 11 03 101 4.5 -9 682.70 -62.6 -58.6 -62.7 61 -99 SPO 1997 04 03 11 04 100 4.6 -9 682.70 -62.6 -58.5 -62.6 61 -99 SPO 1997 04 03 11 05 100 4.6 -9 682.70 -62.6 -58.8 -62.6 61 -99 SPO 1997 04 03 11 06 102 4.6 -9 682.80 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 11 07 103 4.6 -9 682.80 -62.7 -59.2 -62.7 62 -99 SPO 1997 04 03 11 08 104 4.6 -9 682.80 -62.7 -59.2 -62.7 65 -99 SPO 1997 04 03 11 09 104 4.6 -9 682.80 -62.7 -59.3 -62.7 65 -99 SPO 1997 04 03 11 10 104 4.6 -9 682.80 -62.7 -59.6 -62.8 65 -99 SPO 1997 04 03 11 11 104 4.7 -9 682.80 -62.6 -59.8 -62.7 61 -99 SPO 1997 04 03 11 12 105 4.7 -9 682.80 -62.7 -59.9 -62.7 62 -99 SPO 1997 04 03 11 13 105 4.7 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 14 105 4.8 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 15 106 4.8 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 16 106 4.8 -9 682.80 -62.7 -60.1 -62.7 61 -99 SPO 1997 04 03 11 17 108 4.8 -9 682.80 -62.7 -60.2 -62.7 61 -99 SPO 1997 04 03 11 18 107 5.0 -9 682.80 -62.7 -60.2 -62.7 62 -99 SPO 1997 04 03 11 19 106 5.1 -9 682.80 -62.6 -60.2 -62.6 61 -99 SPO 1997 04 03 11 20 106 5.1 -9 682.80 -62.6 -60.2 -62.6 64 -99 SPO 1997 04 03 11 21 106 5.1 -9 682.80 -62.5 -60.3 -62.6 63 -99 SPO 1997 04 03 11 22 107 5.1 -9 682.80 -62.5 -60.3 -62.5 64 -99 SPO 1997 04 03 11 23 109 5.1 -9 682.80 -62.4 -60.4 -62.4 63 -99 SPO 1997 04 03 11 24 109 5.1 -9 682.80 -62.4 -60.4 -62.4 63 -99 SPO 1997 04 03 11 25 109 5.1 -9 682.80 -62.4 -60.4 -62.4 64 -99 SPO 1997 04 03 11 26 107 5.1 -9 682.80 -62.3 -60.5 -62.4 64 -99 SPO 1997 04 03 11 27 106 5.1 -9 682.80 -62.2 -60.5 -62.4 62 -99 SPO 1997 04 03 11 28 105 5.2 -9 682.80 -62.2 -60.5 -62.4 62 -99 SPO 1997 04 03 11 29 104 5.3 -9 682.80 -62.2 -60.5 -62.4 63 -99 SPO 1997 04 03 11 30 104 5.3 -9 682.80 -62.2 -60.5 -62.4 65 -99 SPO 1997 04 03 11 31 103 5.4 -9 682.80 -62.3 -60.5 -62.4 66 -99 SPO 1997 04 03 11 32 104 5.2 -9 682.80 -62.3 -60.5 -62.4 66 -99 SPO 1997 04 03 11 33 104 5.2 -9 682.80 -62.3 -60.4 -62.4 66 -99 SPO 1997 04 03 11 34 103 5.2 -9 682.80 -62.3 -60.4 -62.4 66 -99 SPO 1997 04 03 11 35 102 5.1 -9 682.90 -62.2 -60.4 -62.4 63 -99 SPO 1997 04 03 11 36 102 5.0 -9 682.90 -62.3 -60.4 -62.5 63 -99 SPO 1997 04 03 11 37 103 4.8 -9 682.90 -62.4 -60.4 -62.5 63 -99 SPO 1997 04 03 11 38 103 4.8 -9 682.90 -62.4 -60.5 -62.5 63 -99 SPO 1997 04 03 11 39 102 4.8 -9 682.90 -62.4 -60.5 -62.5 63 -99 SPO 1997 04 03 11 40 102 4.8 -9 682.90 -62.5 -60.6 -62.6 64 -99 SPO 1997 04 03 11 41 101 4.8 -9 682.90 -62.4 -60.6 -62.6 63 -99 SPO 1997 04 03 11 42 101 4.8 -9 682.90 -62.4 -60.5 -62.6 63 -99 SPO 1997 04 03 11 43 102 4.8 -9 682.90 -62.5 -60.5 -62.6 64 -99 SPO 1997 04 03 11 44 103 4.8 -9 682.90 -62.5 -60.5 -62.6 64 -99 SPO 1997 04 03 11 45 104 4.7 -9 682.90 -62.6 -60.6 -62.7 65 -99 SPO 1997 04 03 11 46 105 4.6 -9 682.90 -62.6 -60.6 -62.7 65 -99 SPO 1997 04 03 11 47 106 4.5 -9 683.00 -62.7 -60.6 -62.7 65 -99 SPO 1997 04 03 11 48 107 4.4 -9 683.00 -62.7 -60.6 -62.8 61 -99 SPO 1997 04 03 11 49 108 4.4 -9 683.00 -62.8 -60.6 -62.8 62 -99 SPO 1997 04 03 11 50 107 4.5 -9 683.00 -62.8 -60.6 -62.9 62 -99 SPO 1997 04 03 11 51 107 4.6 -9 683.00 -62.9 -60.5 -63.0 62 -99 SPO 1997 04 03 11 52 107 4.6 -9 682.90 -62.9 -60.5 -63.0 62 -99 SPO 1997 04 03 11 53 108 4.6 -9 682.90 -62.9 -60.4 -63.0 62 -99 SPO 1997 04 03 11 54 106 4.7 -9 682.90 -63.0 -60.4 -63.0 63 -99 SPO 1997 04 03 11 55 104 4.7 -9 682.90 -63.0 -60.3 -63.0 64 -99 SPO 1997 04 03 11 56 103 4.7 -9 682.90 -63.0 -60.2 -63.0 64 -99 SPO 1997 04 03 11 57 103 4.8 -9 682.90 -63.0 -60.2 -63.0 63 -99 SPO 1997 04 03 11 58 103 4.8 -9 682.90 -63.0 -60.0 -63.0 63 -99 SPO 1997 04 03 11 59 103 4.9 -9 682.90 -63.0 -59.8 -63.0 64 -99 SPO 1997 04 03 12 00 101 4.9 -9 682.90 -63.0 -59.6 -63.0 63 0 SPO 1997 04 03 12 01 100 4.9 -9 682.90 -63.0 -59.4 -63.0 63 -99 SPO 1997 04 03 12 02 100 5.1 -9 682.90 -63.0 -59.4 -62.9 61 -99 SPO 1997 04 03 12 03 101 5.2 -9 682.90 -62.9 -59.2 -62.9 60 -99 SPO 1997 04 03 12 04 101 5.2 -9 682.90 -62.9 -59.2 -62.9 60 -99 SPO 1997 04 03 12 05 100 5.2 -9 682.90 -62.9 -59.2 -62.9 62 -99 SPO 1997 04 03 12 06 99 5.1 -9 682.90 -62.8 -59.1 -62.8 62 -99 SPO 1997 04 03 12 07 100 5.2 -9 682.90 -62.8 -59.2 -62.7 62 -99 SPO 1997 04 03 12 08 100 5.3 -9 682.90 -62.8 -59.1 -62.7 63 -99 SPO 1997 04 03 12 09 99 5.3 -9 682.90 -62.7 -59.1 -62.6 62 -99 SPO 1997 04 03 12 10 97 5.3 -9 682.90 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 12 11 97 5.2 -9 682.90 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 12 12 97 5.2 -9 682.80 -62.7 -59.2 -62.8 62 -99 SPO 1997 04 03 12 13 96 5.2 -9 682.90 -62.7 -59.4 -62.8 62 -99 SPO 1997 04 03 12 14 97 5.2 -9 682.90 -62.7 -59.5 -62.8 62 -99 SPO 1997 04 03 12 15 96 5.3 -9 682.80 -62.7 -59.6 -62.8 61 -99 SPO 1997 04 03 12 16 94 5.2 -9 682.90 -62.8 -59.6 -62.8 62 -99 SPO 1997 04 03 12 17 95 5.3 -9 682.90 -62.8 -59.7 -62.9 62 -99 SPO 1997 04 03 12 18 96 5.3 -9 682.90 -62.8 -59.7 -63.0 62 -99 SPO 1997 04 03 12 19 94 5.2 -9 682.90 -62.8 -59.8 -63.0 62 -99 SPO 1997 04 03 12 20 96 5.4 -9 682.90 -62.9 -59.9 -63.0 63 -99 SPO 1997 04 03 12 21 96 5.4 -9 682.90 -63.0 -59.9 -63.0 64 -99 SPO 1997 04 03 12 22 95 5.4 -9 682.90 -63.0 -59.9 -63.1 63 -99 SPO 1997 04 03 12 23 94 5.4 -9 682.90 -63.0 -59.9 -63.1 63 -99 SPO 1997 04 03 12 24 93 5.5 -9 682.90 -63.0 -59.8 -63.1 61 -99 SPO 1997 04 03 12 25 93 5.5 -9 682.90 -63.1 -59.7 -63.1 61 -99 SPO 1997 04 03 12 26 93 5.4 -9 682.90 -63.0 -59.6 -63.1 60 -99 SPO 1997 04 03 12 27 92 5.2 -9 682.90 -63.1 -59.7 -63.1 61 -99 SPO 1997 04 03 12 28 91 5.1 -9 682.90 -63.1 -59.8 -63.1 61 -99 SPO 1997 04 03 12 29 92 5.2 -9 682.90 -63.1 -59.9 -63.1 61 -99 SPO 1997 04 03 12 30 90 5.2 -9 682.90 -63.1 -60.0 -63.1 62 -99 SPO 1997 04 03 12 31 91 5.0 -9 682.90 -63.1 -59.9 -63.1 62 -99 SPO 1997 04 03 12 32 90 4.9 -9 682.90 -63.1 -59.9 -63.1 61 -99 SPO 1997 04 03 12 33 93 4.8 -9 682.90 -63.1 -60.0 -63.1 61 -99 SPO 1997 04 03 12 34 95 4.7 -9 683.00 -63.1 -60.1 -63.2 61 -99 SPO 1997 04 03 12 35 96 4.5 -9 683.00 -63.1 -60.2 -63.2 60 -99 SPO 1997 04 03 12 36 97 4.4 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 37 96 4.4 -9 683.00 -63.1 -60.4 -63.1 61 -99 SPO 1997 04 03 12 38 94 4.3 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 39 91 4.1 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 40 96 4.2 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 41 96 4.1 -9 683.00 -63.0 -60.5 -63.0 61 -99 SPO 1997 04 03 12 42 96 4.0 -9 683.00 -63.0 -60.4 -63.0 63 -99 SPO 1997 04 03 12 43 96 4.1 -9 683.00 -62.9 -60.4 -63.0 62 -99 SPO 1997 04 03 12 44 97 4.4 -9 683.00 -62.9 -60.3 -63.0 62 -99 SPO 1997 04 03 12 45 96 4.3 -9 683.00 -63.0 -60.3 -63.0 63 -99 SPO 1997 04 03 12 46 94 4.4 -9 683.00 -63.0 -60.3 -63.1 61 -99 SPO 1997 04 03 12 47 97 4.4 -9 683.00 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 12 48 95 4.4 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 49 97 4.5 -9 683.00 -63.2 -60.5 -63.2 61 -99 SPO 1997 04 03 12 50 98 4.5 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 51 96 4.6 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 52 96 4.8 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 53 95 4.9 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 54 94 4.9 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 55 95 5.0 -9 683.00 -63.1 -60.4 -63.1 61 -99 SPO 1997 04 03 12 56 94 5.0 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 57 93 5.0 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 58 94 5.1 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 59 92 5.0 -9 683.00 -63.1 -60.3 -63.2 62 -99 SPO 1997 04 03 13 00 92 5.2 -9 683.00 -63.1 -60.4 -63.2 61 0 SPO 1997 04 03 13 01 92 5.4 -9 682.90 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 13 02 91 5.5 -9 682.90 -63.1 -60.4 -63.1 60 -99 SPO 1997 04 03 13 03 90 5.5 -9 682.90 -63.1 -60.3 -63.2 60 -99 SPO 1997 04 03 13 04 88 5.4 -9 682.90 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 13 05 88 5.3 -9 682.90 -63.1 -60.5 -63.2 62 -99 SPO 1997 04 03 13 06 88 5.2 -9 682.90 -63.0 -60.5 -63.1 63 -99 SPO 1997 04 03 13 07 88 5.2 -9 682.90 -63.0 -60.6 -63.1 63 -99 SPO 1997 04 03 13 08 88 5.3 -9 682.90 -63.0 -60.5 -63.1 64 -99 SPO 1997 04 03 13 09 88 5.4 -9 682.90 -63.0 -60.4 -63.1 64 -99 SPO 1997 04 03 13 10 86 5.2 -9 682.90 -63.0 -60.4 -63.1 63 -99 SPO 1997 04 03 13 11 87 5.0 -9 682.90 -63.0 -60.4 -63.1 63 -99 SPO 1997 04 03 13 12 87 5.0 -9 682.90 -63.0 -60.4 -63.2 61 -99 SPO 1997 04 03 13 13 86 5.0 -9 682.90 -63.0 -60.4 -63.2 60 -99 SPO 1997 04 03 13 14 85 5.1 -9 682.90 -63.1 -60.3 -63.2 61 -99 SPO 1997 04 03 13 15 83 5.3 -9 682.90 -63.0 -60.2 -63.2 60 -99 SPO 1997 04 03 13 16 83 5.7 -9 682.90 -63.0 -60.0 -63.1 61 -99 SPO 1997 04 03 13 17 82 5.7 -9 682.90 -63.0 -59.8 -63.1 61 -99 SPO 1997 04 03 13 18 82 5.9 -9 682.80 -63.0 -59.7 -63.1 63 -99 SPO 1997 04 03 13 19 81 6.1 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 20 79 6.1 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 21 80 6.0 -9 682.80 -62.9 -59.6 -63.1 62 -99 SPO 1997 04 03 13 22 80 6.1 -9 682.80 -62.9 -59.6 -63.1 62 -99 SPO 1997 04 03 13 23 80 6.1 -9 682.80 -62.9 -59.7 -63.1 62 -99 SPO 1997 04 03 13 24 79 6.2 -9 682.80 -62.9 -59.6 -63.1 60 -99 SPO 1997 04 03 13 25 80 6.3 -9 682.80 -63.0 -59.7 -63.1 61 -99 SPO 1997 04 03 13 26 79 6.4 -9 682.80 -63.0 -59.6 -63.1 63 -99 SPO 1997 04 03 13 27 78 6.3 -9 682.80 -63.0 -59.6 -63.1 63 -99 SPO 1997 04 03 13 28 78 6.5 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 29 79 6.5 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 30 78 6.3 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 31 79 6.3 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 32 81 6.2 -9 682.80 -63.0 -59.8 -63.1 64 -99 SPO 1997 04 03 13 33 80 5.9 -9 682.80 -63.0 -60.0 -63.1 63 -99 SPO 1997 04 03 13 34 82 5.7 -9 682.80 -63.0 -60.2 -63.2 61 -99 SPO 1997 04 03 13 35 82 5.6 -9 682.80 -63.0 -60.4 -63.1 61 -99 SPO 1997 04 03 13 36 82 5.5 -9 682.80 -63.0 -60.6 -63.1 61 -99 SPO 1997 04 03 13 37 82 5.2 -9 682.80 -63.0 -60.7 -63.2 61 -99 SPO 1997 04 03 13 38 83 5.2 -9 682.80 -63.0 -60.8 -63.2 61 -99 SPO 1997 04 03 13 39 84 5.3 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 40 84 5.2 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 41 82 5.3 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 42 82 5.3 -9 682.80 -63.2 -61.0 -63.3 63 -99 SPO 1997 04 03 13 43 82 5.4 -9 682.80 -63.2 -61.0 -63.3 63 -99 SPO 1997 04 03 13 44 83 5.3 -9 682.80 -63.2 -61.1 -63.3 63 -99 SPO 1997 04 03 13 45 86 5.1 -9 682.80 -63.2 -61.1 -63.4 62 -99 SPO 1997 04 03 13 46 87 5.0 -9 682.80 -63.3 -61.2 -63.4 63 -99 SPO 1997 04 03 13 47 88 4.9 -9 682.90 -63.3 -61.3 -63.4 62 -99 SPO 1997 04 03 13 48 88 4.8 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 49 86 5.0 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 50 84 5.1 -9 682.80 -63.3 -61.5 -63.4 62 -99 SPO 1997 04 03 13 51 82 5.2 -9 682.80 -63.3 -61.5 -63.4 62 -99 SPO 1997 04 03 13 52 82 5.2 -9 682.80 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 53 82 5.2 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 54 82 5.1 -9 682.90 -63.4 -61.4 -63.4 63 -99 SPO 1997 04 03 13 55 84 5.1 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 56 85 5.1 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 57 86 5.0 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 58 86 5.0 -9 682.90 -63.3 -61.4 -63.4 61 -99 SPO 1997 04 03 13 59 86 4.9 -9 682.90 -63.3 -61.5 -63.4 61 -99 SPO 1997 04 03 14 00 86 5.2 -9 682.90 -63.4 -61.5 -63.4 62 0 SPO 1997 04 03 14 01 85 5.2 -9 682.90 -63.3 -61.5 -63.4 60 -99 SPO 1997 04 03 14 02 85 5.3 -9 682.90 -63.3 -61.6 -63.4 61 -99 SPO 1997 04 03 14 03 84 5.3 -9 682.90 -63.3 -61.6 -63.4 62 -99 SPO 1997 04 03 14 04 83 5.3 -9 683.00 -63.3 -61.6 -63.4 62 -99 SPO 1997 04 03 14 05 84 5.2 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 06 83 5.2 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 07 84 5.1 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 08 83 5.1 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 09 84 5.3 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 10 85 5.4 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 11 85 5.5 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 12 85 5.6 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 13 84 5.7 -9 683.00 -63.3 -61.6 -63.4 63 -99 SPO 1997 04 03 14 14 84 5.8 -9 683.00 -63.2 -61.6 -63.3 63 -99 SPO 1997 04 03 14 15 84 5.9 -9 683.00 -63.2 -61.6 -63.2 63 -99 SPO 1997 04 03 14 16 83 5.8 -9 683.00 -63.1 -61.6 -63.2 64 -99 SPO 1997 04 03 14 17 84 5.7 -9 683.00 -63.1 -61.6 -63.2 65 -99 SPO 1997 04 03 14 18 83 5.6 -9 683.00 -63.2 -61.7 -63.3 65 -99 SPO 1997 04 03 14 19 83 5.7 -9 683.00 -63.2 -61.7 -63.3 65 -99 SPO 1997 04 03 14 20 83 5.8 -9 683.00 -63.1 -61.7 -63.3 65 -99 SPO 1997 04 03 14 21 83 5.7 -9 683.00 -63.2 -61.7 -63.3 63 -99 SPO 1997 04 03 14 22 84 5.7 -9 683.00 -63.2 -61.7 -63.3 62 -99 SPO 1997 04 03 14 23 84 5.8 -9 683.00 -63.2 -61.7 -63.3 62 -99 SPO 1997 04 03 14 24 84 5.9 -9 683.00 -63.2 -61.7 -63.4 62 -99 SPO 1997 04 03 14 25 84 6.0 -9 683.00 -63.2 -61.7 -63.4 63 -99 SPO 1997 04 03 14 26 85 5.9 -9 682.90 -63.2 -61.7 -63.4 63 -99 SPO 1997 04 03 14 27 84 5.9 -9 682.90 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 28 84 5.9 -9 683.00 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 29 84 5.8 -9 682.90 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 30 85 5.8 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 31 84 5.7 -9 683.00 -63.3 -61.8 -63.4 63 -99 SPO 1997 04 03 14 32 85 5.6 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 33 83 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 34 84 5.5 -9 682.90 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 35 83 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 36 84 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 37 83 5.6 -9 682.90 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 38 81 5.6 -9 683.00 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 39 81 5.5 -9 683.00 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 40 80 5.5 -9 682.90 -63.6 -61.8 -63.7 65 -99 SPO 1997 04 03 14 41 79 5.5 -9 683.00 -63.6 -61.8 -63.7 65 -99 SPO 1997 04 03 14 42 80 5.4 -9 683.00 -63.6 -61.8 -63.7 64 -99 SPO 1997 04 03 14 43 79 5.3 -9 683.00 -63.7 -61.8 -63.8 64 -99 SPO 1997 04 03 14 44 79 5.2 -9 683.00 -63.7 -61.9 -63.8 63 -99 SPO 1997 04 03 14 45 80 5.2 -9 682.90 -63.8 -61.9 -63.8 62 -99 SPO 1997 04 03 14 46 80 5.1 -9 683.00 -63.8 -62.0 -63.8 62 -99 SPO 1997 04 03 14 47 80 4.9 -9 683.00 -63.8 -62.0 -63.8 62 -99 SPO 1997 04 03 14 48 81 4.8 -9 683.00 -63.8 -62.0 -63.9 62 -99 SPO 1997 04 03 14 49 81 4.7 -9 683.00 -63.8 -62.0 -63.9 62 -99 SPO 1997 04 03 14 50 83 4.6 -9 683.00 -63.9 -62.1 -64.0 63 -99 SPO 1997 04 03 14 51 84 4.6 -9 683.00 -63.9 -62.2 -64.0 63 -99 SPO 1997 04 03 14 52 85 4.5 -9 683.00 -64.0 -62.2 -64.1 63 -99 SPO 1997 04 03 14 53 86 4.4 -9 683.10 -64.0 -62.2 -64.1 63 -99 SPO 1997 04 03 14 54 86 4.2 -9 683.00 -64.1 -62.2 -64.1 63 -99 SPO 1997 04 03 14 55 88 4.2 -9 683.00 -64.0 -62.3 -64.1 63 -99 SPO 1997 04 03 14 56 88 4.2 -9 683.00 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 57 88 4.2 -9 683.00 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 58 88 4.2 -9 683.10 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 59 90 4.0 -9 683.10 -64.1 -62.3 -64.1 60 -99 SPO 1997 04 03 15 00 93 3.8 -9 683.10 -64.1 -62.4 -64.1 60 0 SPO 1997 04 03 15 01 95 3.6 -9 683.10 -64.1 -62.4 -64.1 61 -99 SPO 1997 04 03 15 02 97 3.4 -9 683.20 -64.1 -62.5 -64.1 62 -99 SPO 1997 04 03 15 03 101 3.2 -9 683.20 -64.1 -62.5 -64.2 62 -99 SPO 1997 04 03 15 04 104 3.2 -9 683.20 -64.1 -62.4 -64.2 63 -99 SPO 1997 04 03 15 05 108 3.1 -9 683.20 -64.1 -62.5 -64.2 63 -99 SPO 1997 04 03 15 06 111 2.9 -9 683.20 -64.1 -62.5 -64.1 63 -99 SPO 1997 04 03 15 07 113 2.8 -9 683.20 -64.0 -62.5 -64.0 63 -99 SPO 1997 04 03 15 08 113 2.7 -9 683.20 -63.8 -62.5 -63.9 61 -99 SPO 1997 04 03 15 09 113 2.8 -9 683.20 -63.7 -62.5 -63.9 61 -99 SPO 1997 04 03 15 10 113 3.0 -9 683.20 -63.7 -62.5 -63.9 61 -99 SPO 1997 04 03 15 11 114 3.0 -9 683.20 -63.7 -62.5 -64.0 61 -99 SPO 1997 04 03 15 12 114 3.1 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 13 114 3.1 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 14 114 3.0 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 15 114 3.0 -9 683.20 -63.8 -62.6 -63.9 62 -99 SPO 1997 04 03 15 16 114 3.0 -9 683.20 -63.7 -62.6 -63.9 61 -99 SPO 1997 04 03 15 17 115 2.9 -9 683.20 -63.7 -62.6 -63.9 62 -99 SPO 1997 04 03 15 18 120 2.8 -9 683.20 -63.6 -62.6 -63.8 62 -99 SPO 1997 04 03 15 19 120 2.8 -9 683.20 -63.6 -62.6 -63.8 62 -99 SPO 1997 04 03 15 20 120 3.0 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 21 117 3.0 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 22 116 3.1 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 23 113 3.2 -9 683.20 -63.6 -62.6 -63.8 61 -99 SPO 1997 04 03 15 24 112 3.4 -9 683.20 -63.8 -62.5 -64.1 62 -99 SPO 1997 04 03 15 25 112 3.5 -9 683.20 -64.1 -62.4 -64.3 63 -99 SPO 1997 04 03 15 26 112 3.6 -9 683.20 -64.2 -62.4 -64.4 62 -99 SPO 1997 04 03 15 27 116 3.5 -9 683.20 -64.4 -62.4 -64.4 63 -99 SPO 1997 04 03 15 28 121 3.4 -9 683.20 -64.4 -62.4 -64.4 63 -99 SPO 1997 04 03 15 29 116 3.6 -9 683.20 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 15 30 116 3.6 -9 683.20 -64.5 -62.4 -64.5 63 -99 SPO 1997 04 03 15 31 118 3.5 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 15 32 119 3.6 -9 683.20 -64.6 -62.5 -64.6 62 -99 SPO 1997 04 03 15 33 118 3.6 -9 683.20 -64.7 -62.5 -64.7 61 -99 SPO 1997 04 03 15 34 119 3.7 -9 683.20 -64.8 -62.5 -64.7 62 -99 SPO 1997 04 03 15 35 121 3.9 -9 683.20 -64.8 -62.6 -64.8 61 -99 SPO 1997 04 03 15 36 121 3.9 -9 683.20 -64.8 -62.6 -64.8 61 -99 SPO 1997 04 03 15 37 121 3.9 -9 683.20 -64.8 -62.6 -64.8 62 -99 SPO 1997 04 03 15 38 119 3.9 -9 683.20 -64.8 -62.6 -64.7 62 -99 SPO 1997 04 03 15 39 119 3.9 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 40 118 4.0 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 41 117 4.1 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 42 116 4.1 -9 683.20 -64.7 -62.6 -64.7 62 -99 SPO 1997 04 03 15 43 116 4.2 -9 683.20 -64.6 -62.6 -64.7 60 -99 SPO 1997 04 03 15 44 115 4.4 -9 683.20 -64.6 -62.6 -64.6 60 -99 SPO 1997 04 03 15 45 114 4.4 -9 683.20 -64.6 -62.7 -64.6 60 -99 SPO 1997 04 03 15 46 113 4.4 -9 683.20 -64.6 -62.7 -64.6 61 -99 SPO 1997 04 03 15 47 113 4.4 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 48 115 4.4 -9 683.30 -64.6 -62.8 -64.7 61 -99 SPO 1997 04 03 15 49 117 4.5 -9 683.30 -64.6 -62.8 -64.7 61 -99 SPO 1997 04 03 15 50 115 4.6 -9 683.30 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 51 114 4.6 -9 683.30 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 52 113 4.6 -9 683.20 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 53 111 4.7 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 15 54 109 4.8 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 15 55 109 4.8 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 56 109 4.9 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 57 110 4.8 -9 683.20 -64.7 -62.8 -64.8 62 -99 SPO 1997 04 03 15 58 110 4.9 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 15 59 109 5.0 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 00 107 5.0 -9 683.20 -64.7 -62.8 -64.8 60 0 SPO 1997 04 03 16 01 107 5.0 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 02 106 4.8 -9 683.20 -64.8 -62.8 -64.8 62 -99 SPO 1997 04 03 16 03 107 4.6 -9 683.20 -64.8 -62.8 -64.8 62 -99 SPO 1997 04 03 16 04 109 4.3 -9 683.30 -64.8 -62.8 -64.9 62 -99 SPO 1997 04 03 16 05 114 4.1 -9 683.30 -64.8 -62.9 -64.9 62 -99 SPO 1997 04 03 16 06 114 4.2 -9 683.30 -64.8 -62.9 -64.9 62 -99 SPO 1997 04 03 16 07 113 4.5 -9 683.30 -64.8 -62.9 -64.8 62 -99 SPO 1997 04 03 16 08 111 4.7 -9 683.30 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 09 111 4.7 -9 683.30 -64.7 -62.8 -64.8 62 -99 SPO 1997 04 03 16 10 111 4.8 -9 683.30 -64.7 -62.9 -64.8 62 -99 SPO 1997 04 03 16 11 110 4.8 -9 683.30 -64.7 -62.9 -64.8 62 -99 SPO 1997 04 03 16 12 109 5.1 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 13 108 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 14 107 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 15 106 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 16 106 5.3 -9 683.20 -64.6 -62.9 -64.7 63 -99 SPO 1997 04 03 16 17 105 5.4 -9 683.20 -64.6 -62.8 -64.7 63 -99 SPO 1997 04 03 16 18 105 5.5 -9 683.20 -64.6 -62.8 -64.7 63 -99 SPO 1997 04 03 16 19 104 5.6 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 16 20 104 5.6 -9 683.20 -64.6 -62.7 -64.7 63 -99 SPO 1997 04 03 16 21 104 5.8 -9 683.20 -64.5 -62.7 -64.6 63 -99 SPO 1997 04 03 16 22 104 5.8 -9 683.20 -64.5 -62.7 -64.6 63 -99 SPO 1997 04 03 16 23 103 6.0 -9 683.20 -64.5 -62.6 -64.6 63 -99 SPO 1997 04 03 16 24 101 6.0 -9 683.10 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 25 99 6.1 -9 683.10 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 26 98 6.3 -9 683.10 -64.4 -62.5 -64.5 63 -99 SPO 1997 04 03 16 27 98 6.3 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 28 97 6.3 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 29 96 6.4 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 30 96 6.4 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 31 95 6.5 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 32 95 6.4 -9 683.10 -64.4 -62.4 -64.6 62 -99 SPO 1997 04 03 16 33 94 6.4 -9 683.10 -64.4 -62.3 -64.5 60 -99 SPO 1997 04 03 16 34 94 6.4 -9 683.10 -64.4 -62.3 -64.5 60 -99 SPO 1997 04 03 16 35 94 6.2 -9 683.10 -64.4 -62.3 -64.6 60 -99 SPO 1997 04 03 16 36 95 6.2 -9 683.10 -64.4 -62.3 -64.6 60 -99 SPO 1997 04 03 16 37 95 6.2 -9 683.10 -64.4 -62.3 -64.5 62 -99 SPO 1997 04 03 16 38 94 6.1 -9 683.10 -64.4 -62.3 -64.5 63 -99 SPO 1997 04 03 16 39 94 6.1 -9 683.10 -64.4 -62.3 -64.5 63 -99 SPO 1997 04 03 16 40 95 6.0 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 41 94 5.9 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 42 95 5.9 -9 683.20 -64.4 -62.5 -64.5 63 -99 SPO 1997 04 03 16 43 96 5.8 -9 683.20 -64.4 -62.5 -64.6 60 -99 SPO 1997 04 03 16 44 96 5.8 -9 683.20 -64.4 -62.6 -64.6 60 -99 SPO 1997 04 03 16 45 95 5.9 -9 683.20 -64.5 -62.6 -64.6 61 -99 SPO 1997 04 03 16 46 95 5.9 -9 683.20 -64.5 -62.6 -64.6 60 -99 SPO 1997 04 03 16 47 94 5.9 -9 683.20 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 16 48 93 6.0 -9 683.20 -64.5 -62.6 -64.6 60 -99 SPO 1997 04 03 16 49 93 6.1 -9 683.10 -64.5 -62.6 -64.6 61 -99 SPO 1997 04 03 16 50 93 6.0 -9 683.10 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 51 92 6.0 -9 683.20 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 52 92 6.0 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 53 91 6.1 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 54 92 6.1 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 55 92 6.2 -9 683.20 -64.5 -62.5 -64.6 60 -99 SPO 1997 04 03 16 56 91 6.2 -9 683.20 -64.4 -62.5 -64.6 59 -99 SPO 1997 04 03 16 57 91 6.2 -9 683.20 -64.4 -62.5 -64.5 59 -99 SPO 1997 04 03 16 58 91 6.2 -9 683.20 -64.4 -62.5 -64.5 59 -99 SPO 1997 04 03 16 59 91 6.2 -9 683.20 -64.4 -62.6 -64.5 59 -99 SPO 1997 04 03 17 00 91 6.2 -9 683.20 -64.4 -62.6 -64.5 60 0 SPO 1997 04 03 17 01 91 6.0 -9 683.20 -64.4 -62.6 -64.5 62 -99 SPO 1997 04 03 17 02 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 03 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 04 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 05 90 5.9 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 06 90 5.9 -9 683.20 -64.3 -62.7 -64.5 62 -99 SPO 1997 04 03 17 07 90 6.0 -9 683.20 -64.3 -62.6 -64.5 62 -99 SPO 1997 04 03 17 08 90 6.0 -9 683.20 -64.3 -62.6 -64.5 62 -99 SPO 1997 04 03 17 09 90 5.9 -9 683.20 -64.3 -62.6 -64.4 61 -99 SPO 1997 04 03 17 10 90 6.0 -9 683.20 -64.3 -62.5 -64.4 61 -99 SPO 1997 04 03 17 11 90 6.0 -9 683.20 -64.3 -62.5 -64.4 61 -99 SPO 1997 04 03 17 12 91 6.0 -9 683.20 -64.3 -62.5 -64.4 59 -99 SPO 1997 04 03 17 13 91 5.9 -9 683.20 -64.3 -62.6 -64.4 62 -99 SPO 1997 04 03 17 14 93 5.9 -9 683.20 -64.3 -62.7 -64.4 63 -99 SPO 1997 04 03 17 15 94 5.8 -9 683.20 -64.3 -62.8 -64.4 63 -99 SPO 1997 04 03 17 16 95 5.8 -9 683.20 -64.3 -62.8 -64.4 62 -99 SPO 1997 04 03 17 17 95 5.8 -9 683.20 -64.3 -62.9 -64.4 62 -99 SPO 1997 04 03 17 18 95 5.8 -9 683.20 -64.4 -62.9 -64.5 62 -99 SPO 1997 04 03 17 19 95 5.9 -9 683.20 -64.4 -63.0 -64.5 62 -99 SPO 1997 04 03 17 20 95 6.1 -9 683.20 -64.3 -63.0 -64.4 61 -99 SPO 1997 04 03 17 21 94 6.1 -9 683.20 -64.3 -62.9 -64.4 61 -99 SPO 1997 04 03 17 22 94 6.1 -9 683.20 -64.3 -62.7 -64.4 61 -99 SPO 1997 04 03 17 23 95 6.1 -9 683.20 -64.3 -62.7 -64.4 61 -99 SPO 1997 04 03 17 24 95 6.1 -9 683.20 -64.3 -62.6 -64.4 61 -99 SPO 1997 04 03 17 25 94 6.2 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 26 95 6.0 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 27 96 5.9 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 28 96 5.9 -9 683.20 -64.3 -62.6 -64.5 61 -99 SPO 1997 04 03 17 29 97 5.7 -9 683.20 -64.4 -62.6 -64.5 62 -99 SPO 1997 04 03 17 30 98 5.5 -9 683.30 -64.4 -62.5 -64.5 62 -99 SPO 1997 04 03 17 31 99 5.5 -9 683.30 -64.4 -62.5 -64.5 62 -99 SPO 1997 04 03 17 32 100 5.5 -9 683.30 -64.4 -62.6 -64.6 60 -99 SPO 1997 04 03 17 33 101 5.4 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 34 100 5.4 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 35 100 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 36 100 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 37 98 5.8 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 38 97 5.8 -9 683.30 -64.5 -62.8 -64.6 60 -99 SPO 1997 04 03 17 39 96 6.0 -9 683.30 -64.5 -62.8 -64.6 61 -99 SPO 1997 04 03 17 40 95 5.9 -9 683.30 -64.5 -62.8 -64.6 61 -99 SPO 1997 04 03 17 41 95 5.9 -9 683.30 -64.5 -62.7 -64.6 61 -99 SPO 1997 04 03 17 42 96 5.8 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 43 96 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 44 98 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 45 99 5.4 -9 683.40 -64.5 -62.9 -64.6 59 -99 SPO 1997 04 03 17 46 100 5.4 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 47 98 5.5 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 48 97 5.5 -9 683.40 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 17 49 97 5.6 -9 683.40 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 17 50 97 5.5 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 51 98 5.4 -9 683.40 -64.5 -63.1 -64.6 60 -99 SPO 1997 04 03 17 52 98 5.5 -9 683.40 -64.6 -63.2 -64.7 61 -99 SPO 1997 04 03 17 53 97 5.5 -9 683.50 -64.6 -63.2 -64.7 61 -99 SPO 1997 04 03 17 54 96 5.6 -9 683.40 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 17 55 96 5.7 -9 683.40 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 17 56 96 5.7 -9 683.50 -64.6 -63.1 -64.7 59 -99 SPO 1997 04 03 17 57 95 5.9 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 17 58 95 6.0 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 17 59 96 6.0 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 18 00 98 5.7 -9 683.50 -64.6 -63.2 -64.6 59 0 SPO 1997 04 03 18 01 100 5.5 -9 683.50 -64.6 -63.2 -64.6 60 -99 SPO 1997 04 03 18 02 100 5.6 -9 683.50 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 18 03 98 5.7 -9 683.50 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 18 04 97 5.9 -9 683.40 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 05 97 5.9 -9 683.40 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 06 98 5.9 -9 683.50 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 07 99 5.8 -9 683.50 -64.5 -63.3 -64.6 59 -99 SPO 1997 04 03 18 08 99 5.8 -9 683.50 -64.5 -63.3 -64.7 59 -99 SPO 1997 04 03 18 09 99 5.9 -9 683.50 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 18 10 99 6.0 -9 683.50 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 18 11 99 6.0 -9 683.50 -64.6 -63.3 -64.7 58 -99 SPO 1997 04 03 18 12 98 6.1 -9 683.50 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 13 96 6.1 -9 683.50 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 18 14 96 6.0 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 15 96 6.0 -9 683.50 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 16 97 6.0 -9 683.50 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 17 97 5.9 -9 683.50 -64.6 -63.3 -64.7 61 -99 SPO 1997 04 03 18 18 97 5.9 -9 683.50 -64.6 -63.3 -64.7 61 -99 SPO 1997 04 03 18 19 96 6.0 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 20 95 5.9 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 21 96 5.7 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 22 97 5.8 -9 683.60 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 23 97 5.9 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 24 96 5.9 -9 683.50 -64.6 -63.4 -64.7 58 -99 SPO 1997 04 03 18 25 96 6.1 -9 683.50 -64.6 -63.4 -64.7 58 -99 SPO 1997 04 03 18 26 96 6.1 -9 683.50 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 27 94 6.2 -9 683.50 -64.6 -63.5 -64.6 60 -99 SPO 1997 04 03 18 28 94 6.2 -9 683.50 -64.6 -63.5 -64.6 61 -99 SPO 1997 04 03 18 29 94 6.2 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 30 95 6.1 -9 683.50 -64.5 -63.6 -64.6 60 -99 SPO 1997 04 03 18 31 94 6.3 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 32 93 6.4 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 33 94 6.3 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 34 94 6.0 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 35 94 6.2 -9 683.60 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 36 93 6.3 -9 683.60 -64.5 -63.6 -64.6 59 -99 SPO 1997 04 03 18 37 92 6.4 -9 683.60 -64.5 -63.6 -64.6 59 -99 SPO 1997 04 03 18 38 92 6.4 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 39 91 6.5 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 40 91 6.5 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 41 92 6.4 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 42 93 6.2 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 43 94 6.2 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 44 96 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 45 97 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 46 98 5.9 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 47 97 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 48 96 6.0 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 49 95 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 50 95 6.2 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 51 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 52 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 53 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 54 93 6.3 -9 683.60 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 55 92 6.3 -9 683.60 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 56 91 6.2 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 57 91 6.2 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 58 91 6.2 -9 683.60 -64.6 -63.6 -64.7 59 -99 SPO 1997 04 03 18 59 91 6.2 -9 683.60 -64.6 -63.6 -64.7 58 -99 SPO 1997 04 03 19 00 91 6.1 -9 683.60 -64.6 -63.5 -64.7 59 0 SPO 1997 04 03 19 01 90 6.1 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 19 02 90 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 03 91 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 04 91 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 05 92 5.9 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 06 93 5.9 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 19 07 95 5.9 -9 683.60 -64.6 -63.6 -64.8 59 -99 SPO 1997 04 03 19 08 94 5.8 -9 683.60 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 19 09 94 5.8 -9 683.60 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 19 10 94 5.8 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 11 94 6.0 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 12 93 6.0 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 13 93 6.1 -9 683.60 -64.8 -63.7 -64.8 58 -99 SPO 1997 04 03 19 14 92 6.2 -9 683.60 -64.8 -63.6 -64.8 58 -99 SPO 1997 04 03 19 15 92 6.1 -9 683.60 -64.7 -63.5 -64.8 62 -99 SPO 1997 04 03 19 16 92 6.1 -9 683.60 -64.7 -63.5 -64.9 58 -99 SPO 1997 04 03 19 17 94 6.1 -9 683.60 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 19 18 94 5.9 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 19 94 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 20 95 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 21 95 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 22 95 5.7 -9 683.60 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 23 95 5.8 -9 683.60 -64.8 -63.4 -65.0 57 -99 SPO 1997 04 03 19 24 95 5.8 -9 683.60 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 19 25 95 5.7 -9 683.60 -64.9 -63.4 -64.9 59 -99 SPO 1997 04 03 19 26 96 5.6 -9 683.60 -64.9 -63.4 -65.0 59 -99 SPO 1997 04 03 19 27 97 5.6 -9 683.60 -64.9 -63.4 -64.9 59 -99 SPO 1997 04 03 19 28 99 5.5 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 29 99 5.4 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 30 100 5.4 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 31 100 5.4 -9 683.70 -64.8 -63.3 -64.9 58 -99 SPO 1997 04 03 19 32 99 5.5 -9 683.70 -64.7 -63.3 -64.9 58 -99 SPO 1997 04 03 19 33 99 5.4 -9 683.70 -64.7 -63.2 -64.9 58 -99 SPO 1997 04 03 19 34 98 5.5 -9 683.70 -64.7 -63.2 -64.8 58 -99 SPO 1997 04 03 19 35 98 5.5 -9 683.70 -64.7 -63.1 -64.8 57 -99 SPO 1997 04 03 19 36 98 5.4 -9 683.70 -64.6 -63.1 -64.7 56 -99 SPO 1997 04 03 19 37 98 5.5 -9 683.70 -64.6 -63.0 -64.7 57 -99 SPO 1997 04 03 19 38 97 5.6 -9 683.70 -64.6 -63.0 -64.7 57 -99 SPO 1997 04 03 19 39 97 5.7 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 40 98 5.6 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 41 99 5.7 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 42 98 5.9 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 43 98 5.9 -9 683.70 -64.5 -63.1 -64.6 60 -99 SPO 1997 04 03 19 44 98 5.9 -9 683.70 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 19 45 98 5.9 -9 683.70 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 19 46 99 5.9 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 47 99 6.0 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 48 99 6.0 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 49 98 6.0 -9 683.70 -64.4 -63.0 -64.5 60 -99 SPO 1997 04 03 19 50 98 6.0 -9 683.70 -64.4 -63.0 -64.5 60 -99 SPO 1997 04 03 19 51 98 6.0 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 52 98 6.2 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 53 98 6.3 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 54 99 6.5 -9 683.60 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 55 99 6.4 -9 683.60 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 56 98 6.4 -9 683.60 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 57 98 6.4 -9 683.70 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 58 99 6.2 -9 683.70 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 59 102 6.1 -9 683.80 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 20 00 104 6.0 -9 683.80 -64.4 -62.9 -64.5 59 0 SPO 1997 04 03 20 01 105 5.7 -9 683.80 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 20 02 105 5.6 -9 683.80 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 20 03 106 5.4 -9 683.80 -64.4 -63.1 -64.5 59 -99 SPO 1997 04 03 20 04 110 5.1 -9 683.90 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 20 05 116 4.8 -9 683.90 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 20 06 118 4.9 -9 683.90 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 20 07 115 5.2 -9 683.90 -64.6 -63.5 -64.8 58 -99 SPO 1997 04 03 20 08 113 5.4 -9 683.90 -64.7 -63.6 -64.9 58 -99 SPO 1997 04 03 20 09 113 5.4 -9 683.90 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 20 10 113 5.3 -9 683.90 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 20 11 113 5.1 -9 683.90 -64.9 -63.6 -64.9 58 -99 SPO 1997 04 03 20 12 112 5.1 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 13 112 5.0 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 14 112 5.1 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 15 112 5.1 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 16 112 5.3 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 17 112 5.3 -9 683.90 -64.9 -63.3 -65.0 58 -99 SPO 1997 04 03 20 18 113 5.2 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 19 114 5.2 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 20 112 5.3 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 21 111 5.2 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 22 111 5.1 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 23 111 5.0 -9 683.90 -64.9 -63.5 -65.0 56 -99 SPO 1997 04 03 20 24 111 5.3 -9 683.90 -64.9 -63.6 -65.0 56 -99 SPO 1997 04 03 20 25 111 5.4 -9 683.90 -64.9 -63.6 -65.0 56 -99 SPO 1997 04 03 20 26 110 5.7 -9 683.90 -65.0 -63.6 -65.0 58 -99 SPO 1997 04 03 20 27 110 5.9 -9 683.90 -65.0 -63.5 -65.1 59 -99 SPO 1997 04 03 20 28 110 5.9 -9 683.90 -65.0 -63.4 -65.1 59 -99 SPO 1997 04 03 20 29 109 6.0 -9 683.90 -65.0 -63.4 -65.1 58 -99 SPO 1997 04 03 20 30 110 6.0 -9 683.80 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 31 110 6.0 -9 683.80 -65.0 -63.1 -65.1 57 -99 SPO 1997 04 03 20 32 109 6.1 -9 683.80 -65.1 -63.1 -65.2 58 -99 SPO 1997 04 03 20 33 108 6.0 -9 683.80 -65.1 -63.0 -65.2 58 -99 SPO 1997 04 03 20 34 109 5.9 -9 683.90 -65.1 -63.0 -65.2 57 -99 SPO 1997 04 03 20 35 110 5.7 -9 683.90 -65.0 -63.0 -65.1 56 -99 SPO 1997 04 03 20 36 111 5.6 -9 683.90 -65.0 -63.1 -65.1 57 -99 SPO 1997 04 03 20 37 111 5.6 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 38 111 5.6 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 39 111 5.7 -9 683.90 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 20 40 111 5.8 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 41 110 5.8 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 42 108 5.9 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 43 108 5.9 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 44 108 6.0 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 45 108 6.0 -9 683.90 -64.9 -63.2 -65.1 58 -99 SPO 1997 04 03 20 46 107 6.1 -9 683.90 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 47 106 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 48 105 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 49 104 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 50 104 6.3 -9 683.90 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 51 104 6.5 -9 683.80 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 52 105 6.4 -9 683.90 -64.9 -63.1 -65.0 59 -99 SPO 1997 04 03 20 53 104 6.3 -9 683.90 -64.8 -63.1 -64.9 58 -99 SPO 1997 04 03 20 54 104 6.3 -9 683.90 -64.8 -63.1 -64.9 58 -99 SPO 1997 04 03 20 55 104 6.3 -9 683.90 -64.8 -63.0 -64.9 58 -99 SPO 1997 04 03 20 56 104 6.3 -9 683.90 -64.7 -63.0 -64.9 58 -99 SPO 1997 04 03 20 57 105 6.3 -9 683.90 -64.7 -63.0 -64.9 58 -99 SPO 1997 04 03 20 58 105 6.6 -9 683.90 -64.7 -62.8 -64.9 60 -99 SPO 1997 04 03 20 59 105 6.6 -9 683.90 -64.7 -62.7 -64.9 60 -99 SPO 1997 04 03 21 00 104 6.6 -9 683.90 -64.7 -62.7 -64.8 58 0 SPO 1997 04 03 21 01 104 6.5 -9 683.90 -64.7 -62.7 -64.8 60 -99 SPO 1997 04 03 21 02 104 6.5 -9 683.90 -64.6 -62.7 -64.7 59 -99 SPO 1997 04 03 21 03 104 6.4 -9 683.90 -64.6 -62.7 -64.7 59 -99 SPO 1997 04 03 21 04 105 6.3 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 05 104 6.4 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 06 103 6.3 -9 683.90 -64.6 -62.9 -64.7 60 -99 SPO 1997 04 03 21 07 103 6.3 -9 683.90 -64.6 -62.8 -64.7 59 -99 SPO 1997 04 03 21 08 102 6.1 -9 683.90 -64.6 -62.9 -64.7 59 -99 SPO 1997 04 03 21 09 101 6.1 -9 683.90 -64.6 -62.9 -64.7 59 -99 SPO 1997 04 03 21 10 102 6.1 -9 683.90 -64.5 -63.0 -64.7 59 -99 SPO 1997 04 03 21 11 100 6.1 -9 683.90 -64.5 -63.0 -64.7 59 -99 SPO 1997 04 03 21 12 100 6.2 -9 683.90 -64.5 -62.9 -64.7 59 -99 SPO 1997 04 03 21 13 100 6.2 -9 683.90 -64.5 -62.8 -64.7 59 -99 SPO 1997 04 03 21 14 99 6.3 -9 683.90 -64.6 -62.9 -64.7 60 -99 SPO 1997 04 03 21 15 99 6.2 -9 683.90 -64.5 -62.8 -64.7 59 -99 SPO 1997 04 03 21 16 99 6.2 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 17 99 6.0 -9 683.90 -64.6 -62.8 -64.7 59 -99 SPO 1997 04 03 21 18 99 6.0 -9 683.90 -64.5 -62.9 -64.7 59 -99 SPO 1997 04 03 21 19 100 5.9 -9 684.00 -64.5 -63.0 -64.7 57 -99 SPO 1997 04 03 21 20 101 5.9 -9 684.00 -64.6 -63.1 -64.7 59 -99 SPO 1997 04 03 21 21 102 6.0 -9 684.00 -64.6 -63.2 -64.7 58 -99 SPO 1997 04 03 21 22 102 6.1 -9 684.00 -64.6 -63.2 -64.7 58 -99 SPO 1997 04 03 21 23 101 6.0 -9 684.00 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 21 24 101 6.0 -9 684.00 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 21 25 101 5.9 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 26 102 6.1 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 27 102 6.2 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 28 102 6.3 -9 684.00 -64.5 -63.3 -64.6 59 -99 SPO 1997 04 03 21 29 102 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 30 102 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 31 103 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 32 104 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 33 103 6.2 -9 684.10 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 21 34 103 6.2 -9 684.10 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 21 35 104 6.1 -9 684.10 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 21 36 103 6.1 -9 684.10 -64.6 -63.5 -64.8 60 -99 SPO 1997 04 03 21 37 103 6.1 -9 684.10 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 38 104 6.1 -9 684.10 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 39 105 5.9 -9 684.20 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 40 107 5.9 -9 684.20 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 41 107 5.9 -9 684.20 -64.7 -63.5 -64.8 60 -99 SPO 1997 04 03 21 42 105 5.9 -9 684.20 -64.7 -63.5 -64.9 58 -99 SPO 1997 04 03 21 43 104 6.1 -9 684.20 -64.7 -63.5 -64.8 58 -99 SPO 1997 04 03 21 44 104 6.1 -9 684.20 -64.7 -63.4 -64.8 57 -99 SPO 1997 04 03 21 45 104 6.0 -9 684.20 -64.7 -63.4 -64.8 57 -99 SPO 1997 04 03 21 46 104 5.9 -9 684.20 -64.7 -63.5 -64.8 57 -99 SPO 1997 04 03 21 47 105 5.8 -9 684.30 -64.7 -63.6 -64.8 57 -99 SPO 1997 04 03 21 48 105 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 49 104 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 50 103 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 51 102 6.0 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 52 102 6.0 -9 684.30 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 21 53 102 6.1 -9 684.20 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 21 54 102 6.2 -9 684.20 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 55 101 6.2 -9 684.30 -64.7 -63.7 -64.8 60 -99 SPO 1997 04 03 21 56 100 6.1 -9 684.30 -64.6 -63.7 -64.7 57 -99 SPO 1997 04 03 21 57 99 6.2 -9 684.30 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 21 58 98 6.3 -9 684.20 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 21 59 97 6.4 -9 684.20 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 22 00 97 6.3 -9 684.20 -64.6 -63.5 -64.8 -99 0 SPO 1997 04 03 22 01 96 6.5 -9 684.20 -64.6 -63.5 -64.8 -99 -99 SPO 1997 04 03 22 02 96 6.4 -9 684.20 -64.6 -63.6 -64.7 59 -99 SPO 1997 04 03 22 03 96 6.2 -9 684.20 -64.6 -63.6 -64.7 60 -99 SPO 1997 04 03 22 04 94 6.2 -9 684.20 -64.6 -63.6 -64.7 60 -99 SPO 1997 04 03 22 05 93 6.0 -9 684.20 -64.6 -63.6 -64.8 59 -99 SPO 1997 04 03 22 06 92 5.7 -9 684.20 -64.7 -63.6 -64.8 60 -99 SPO 1997 04 03 22 07 92 5.5 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 22 08 94 5.3 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 22 09 95 5.3 -9 684.30 -64.7 -63.7 -64.9 57 -99 SPO 1997 04 03 22 10 96 5.2 -9 684.30 -64.8 -63.7 -64.9 58 -99 SPO 1997 04 03 22 11 97 5.4 -9 684.30 -64.8 -63.7 -64.9 58 -99 SPO 1997 04 03 22 12 97 5.4 -9 684.30 -64.8 -63.7 -65.0 58 -99 SPO 1997 04 03 22 13 95 5.5 -9 684.30 -64.8 -63.6 -65.0 58 -99 SPO 1997 04 03 22 14 95 5.7 -9 684.30 -64.9 -63.6 -65.0 58 -99 SPO 1997 04 03 22 15 95 5.6 -9 684.30 -64.9 -63.6 -65.0 58 -99 SPO 1997 04 03 22 16 96 5.6 -9 684.30 -64.9 -63.7 -65.0 58 -99 SPO 1997 04 03 22 17 97 5.6 -9 684.30 -64.9 -63.8 -65.0 58 -99 SPO 1997 04 03 22 18 96 5.6 -9 684.30 -64.9 -63.8 -65.0 58 -99 SPO 1997 04 03 22 19 98 5.5 -9 684.30 -65.0 -63.8 -65.0 58 -99 SPO 1997 04 03 22 20 98 5.5 -9 684.30 -65.0 -63.8 -65.1 57 -99 SPO 1997 04 03 22 21 98 5.5 -9 684.30 -65.0 -63.8 -65.2 55 -99 SPO 1997 04 03 22 22 98 5.5 -9 684.30 -65.1 -63.8 -65.2 56 -99 SPO 1997 04 03 22 23 98 5.4 -9 684.30 -65.1 -63.8 -65.2 57 -99 SPO 1997 04 03 22 24 99 5.5 -9 684.30 -65.1 -63.7 -65.2 57 -99 SPO 1997 04 03 22 25 100 5.5 -9 684.30 -65.1 -63.7 -65.2 57 -99 SPO 1997 04 03 22 26 100 5.4 -9 684.40 -65.2 -63.7 -65.2 58 -99 SPO 1997 04 03 22 27 100 5.4 -9 684.40 -65.2 -63.7 -65.3 58 -99 SPO 1997 04 03 22 28 100 5.4 -9 684.40 -65.2 -63.8 -65.3 58 -99 SPO 1997 04 03 22 29 100 5.5 -9 684.30 -65.2 -63.8 -65.3 57 -99 SPO 1997 04 03 22 30 98 5.6 -9 684.30 -65.2 -63.8 -65.4 56 -99 SPO 1997 04 03 22 31 97 5.5 -9 684.30 -65.3 -63.8 -65.4 55 -99 SPO 1997 04 03 22 32 96 5.7 -9 684.30 -65.3 -63.9 -65.4 55 -99 SPO 1997 04 03 22 33 94 5.5 -9 684.30 -65.3 -63.9 -65.4 55 -99 SPO 1997 04 03 22 34 94 5.5 -9 684.30 -65.4 -63.9 -65.4 55 -99 SPO 1997 04 03 22 35 95 5.4 -9 684.30 -65.4 -63.8 -65.4 56 -99 SPO 1997 04 03 22 36 95 5.5 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 37 95 5.6 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 38 94 5.7 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 39 93 5.6 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 40 95 5.5 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 41 95 5.5 -9 684.40 -65.4 -63.9 -65.5 58 -99 SPO 1997 04 03 22 42 96 5.5 -9 684.40 -65.4 -63.8 -65.5 55 -99 SPO 1997 04 03 22 43 97 5.2 -9 684.40 -65.4 -63.8 -65.5 55 -99 SPO 1997 04 03 22 44 98 5.1 -9 684.40 -65.5 -63.9 -65.6 55 -99 SPO 1997 04 03 22 45 97 5.3 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 46 96 5.6 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 47 95 5.5 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 48 97 5.3 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 49 97 5.3 -9 684.40 -65.5 -64.0 -65.6 56 -99 SPO 1997 04 03 22 50 94 5.5 -9 684.40 -65.5 -63.9 -65.6 57 -99 SPO 1997 04 03 22 51 92 5.7 -9 684.40 -65.5 -63.9 -65.6 57 -99 SPO 1997 04 03 22 52 92 5.8 -9 684.40 -65.5 -63.8 -65.6 56 -99 SPO 1997 04 03 22 53 93 5.6 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 22 54 94 5.4 -9 684.40 -65.6 -63.7 -65.7 56 -99 SPO 1997 04 03 22 55 93 5.5 -9 684.40 -65.6 -63.7 -65.7 56 -99 SPO 1997 04 03 22 56 90 5.6 -9 684.40 -65.5 -63.7 -65.6 55 -99 SPO 1997 04 03 22 57 90 5.8 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 22 58 90 5.8 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 22 59 90 5.9 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 23 00 89 5.9 -9 684.40 -65.4 -63.6 -65.4 55 0 SPO 1997 04 03 23 01 88 6.0 -9 684.40 -65.4 -63.6 -65.4 58 -99 SPO 1997 04 03 23 02 88 6.2 -9 684.30 -65.3 -63.6 -65.3 58 -99 SPO 1997 04 03 23 03 87 6.2 -9 684.30 -65.2 -63.6 -65.3 57 -99 SPO 1997 04 03 23 04 88 6.3 -9 684.30 -65.2 -63.5 -65.3 58 -99 SPO 1997 04 03 23 05 87 6.3 -9 684.30 -65.1 -63.4 -65.2 57 -99 SPO 1997 04 03 23 06 87 6.1 -9 684.30 -65.1 -63.4 -65.2 57 -99 SPO 1997 04 03 23 07 86 6.0 -9 684.30 -65.1 -63.3 -65.2 58 -99 SPO 1997 04 03 23 08 86 6.0 -9 684.30 -65.0 -63.3 -65.2 57 -99 SPO 1997 04 03 23 09 86 6.1 -9 684.30 -65.1 -63.2 -65.2 58 -99 SPO 1997 04 03 23 10 87 6.2 -9 684.30 -65.0 -63.1 -65.2 57 -99 SPO 1997 04 03 23 11 88 6.3 -9 684.30 -65.0 -63.1 -65.2 58 -99 SPO 1997 04 03 23 12 88 6.4 -9 684.30 -65.0 -63.0 -65.2 58 -99 SPO 1997 04 03 23 13 89 6.5 -9 684.30 -65.0 -62.9 -65.2 59 -99 SPO 1997 04 03 23 14 91 6.5 -9 684.40 -65.0 -63.0 -65.1 59 -99 SPO 1997 04 03 23 15 92 6.3 -9 684.40 -65.0 -63.1 -65.1 59 -99 SPO 1997 04 03 23 16 93 6.3 -9 684.40 -65.0 -63.2 -65.2 59 -99 SPO 1997 04 03 23 17 93 6.2 -9 684.40 -65.0 -63.2 -65.2 59 -99 SPO 1997 04 03 23 18 92 6.1 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 19 93 5.9 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 20 92 5.8 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 21 92 5.8 -9 684.40 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 23 22 92 5.9 -9 684.40 -65.0 -63.3 -65.2 59 -99 SPO 1997 04 03 23 23 92 5.9 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 24 93 5.9 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 25 92 6.0 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 26 91 6.0 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 27 90 6.0 -9 684.30 -65.0 -63.3 -65.1 -99 -99 SPO 1997 04 03 23 28 90 6.0 -9 684.40 -65.0 -63.4 -65.1 -99 -99 SPO 1997 04 03 23 29 92 6.0 -9 684.40 -65.0 -63.4 -65.2 59 -99 SPO 1997 04 03 23 30 93 5.9 -9 684.40 -65.1 -63.4 -65.2 60 -99 SPO 1997 04 03 23 31 92 5.9 -9 684.40 -65.1 -63.4 -65.2 60 -99 SPO 1997 04 03 23 32 91 6.0 -9 684.40 -65.1 -63.5 -65.3 60 -99 SPO 1997 04 03 23 33 91 6.0 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 34 92 6.2 -9 684.40 -65.2 -63.5 -65.3 58 -99 SPO 1997 04 03 23 35 94 6.5 -9 684.40 -65.2 -63.4 -65.3 58 -99 SPO 1997 04 03 23 36 94 6.7 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 37 93 6.8 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 38 94 6.7 -9 684.40 -65.2 -63.6 -65.3 61 -99 SPO 1997 04 03 23 39 95 6.5 -9 684.40 -65.2 -63.6 -65.4 61 -99 SPO 1997 04 03 23 40 93 6.2 -9 684.40 -65.3 -63.7 -65.4 61 -99 SPO 1997 04 03 23 41 92 6.1 -9 684.40 -65.3 -63.6 -65.4 59 -99 SPO 1997 04 03 23 42 93 6.1 -9 684.40 -65.3 -63.5 -65.4 58 -99 SPO 1997 04 03 23 43 94 6.1 -9 684.40 -65.3 -63.5 -65.5 58 -99 SPO 1997 04 03 23 44 93 6.1 -9 684.40 -65.4 -63.5 -65.5 58 -99 SPO 1997 04 03 23 45 91 6.0 -9 684.40 -65.4 -63.5 -65.5 58 -99 SPO 1997 04 03 23 46 91 5.9 -9 684.40 -65.5 -63.6 -65.5 59 -99 SPO 1997 04 03 23 47 92 5.8 -9 684.40 -65.5 -63.6 -65.6 59 -99 SPO 1997 04 03 23 48 92 5.7 -9 684.40 -65.5 -63.6 -65.6 59 -99 SPO 1997 04 03 23 49 92 5.6 -9 684.40 -65.5 -63.6 -65.6 58 -99 SPO 1997 04 03 23 50 93 5.5 -9 684.40 -65.6 -63.7 -65.7 58 -99 SPO 1997 04 03 23 51 93 5.6 -9 684.40 -65.6 -63.8 -65.7 57 -99 SPO 1997 04 03 23 52 92 5.5 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 23 53 91 5.3 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 23 54 92 5.2 -9 684.40 -65.7 -63.8 -65.8 56 -99 SPO 1997 04 03 23 55 94 5.2 -9 684.40 -65.7 -63.8 -65.8 54 -99 SPO 1997 04 03 23 56 96 5.2 -9 684.40 -65.7 -63.9 -65.8 53 -99 SPO 1997 04 03 23 57 96 5.2 -9 684.50 -65.7 -64.0 -65.8 53 -99 SPO 1997 04 03 23 58 95 5.1 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 03 23 59 94 5.0 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 00 93 5.0 -9 684.40 -65.7 -64.0 -65.8 -99 0 SPO 1997 04 04 00 01 93 5.0 -9 684.40 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 02 94 5.1 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 03 94 5.1 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 04 93 5.2 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 05 92 5.1 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 06 91 5.0 -9 684.40 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 07 91 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 08 91 4.8 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 09 92 4.8 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 10 92 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 11 94 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 12 95 4.9 -9 684.50 -65.7 -64.3 -65.8 -99 -99 SPO 1997 04 04 00 13 96 4.8 -9 684.60 -65.7 -64.4 -65.8 57 -99 SPO 1997 04 04 00 14 97 4.7 -9 684.60 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 15 98 4.7 -9 684.60 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 16 99 4.7 -9 684.60 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 17 98 4.8 -9 684.60 -65.8 -64.6 -65.9 56 -99 SPO 1997 04 04 00 18 98 4.8 -9 684.60 -65.8 -64.5 -65.9 55 -99 SPO 1997 04 04 00 19 99 4.8 -9 684.60 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 20 101 4.9 -9 684.70 -65.8 -64.5 -65.9 55 -99 SPO 1997 04 04 00 21 101 4.8 -9 684.70 -65.7 -64.4 -65.9 55 -99 SPO 1997 04 04 00 22 102 4.7 -9 684.70 -65.7 -64.4 -65.8 56 -99 SPO 1997 04 04 00 23 102 4.7 -9 684.70 -65.7 -64.3 -65.9 56 -99 SPO 1997 04 04 00 24 101 4.6 -9 684.70 -65.8 -64.3 -65.9 57 -99 SPO 1997 04 04 00 25 100 4.6 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 26 99 4.5 -9 684.70 -65.7 -64.4 -65.9 56 -99 SPO 1997 04 04 00 27 99 4.6 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 28 100 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 29 100 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 30 99 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 31 97 4.7 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 32 97 4.8 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 33 97 4.8 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 34 99 4.7 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 35 100 4.8 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 36 100 4.8 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 37 101 4.9 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 38 101 4.9 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 39 102 4.9 -9 684.70 -65.8 -64.4 -66.0 55 -99 SPO 1997 04 04 00 40 101 4.8 -9 684.70 -65.9 -64.5 -66.0 55 -99 SPO 1997 04 04 00 41 99 4.8 -9 684.60 -65.9 -64.5 -66.0 56 -99 SPO 1997 04 04 00 42 98 4.8 -9 684.60 -65.9 -64.5 -66.0 56 -99 SPO 1997 04 04 00 43 97 4.8 -9 684.60 -66.0 -64.5 -66.1 57 -99 SPO 1997 04 04 00 44 97 4.8 -9 684.60 -66.0 -64.6 -66.1 56 -99 SPO 1997 04 04 00 45 97 4.9 -9 684.60 -66.1 -64.6 -66.1 56 -99 SPO 1997 04 04 00 46 97 5.1 -9 684.60 -66.1 -64.5 -66.2 57 -99 SPO 1997 04 04 00 47 99 5.1 -9 684.60 -66.1 -64.5 -66.2 57 -99 SPO 1997 04 04 00 48 100 5.2 -9 684.70 -66.1 -64.6 -66.2 57 -99 SPO 1997 04 04 00 49 101 5.1 -9 684.70 -66.2 -64.6 -66.2 58 -99 SPO 1997 04 04 00 50 102 5.2 -9 684.70 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 00 51 103 5.1 -9 684.70 -66.2 -64.7 -66.3 55 -99 SPO 1997 04 04 00 52 106 4.9 -9 684.70 -66.2 -64.7 -66.3 55 -99 SPO 1997 04 04 00 53 106 4.9 -9 684.80 -66.2 -64.7 -66.3 54 -99 SPO 1997 04 04 00 54 105 4.9 -9 684.70 -66.3 -64.8 -66.3 54 -99 SPO 1997 04 04 00 55 102 4.8 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 56 100 4.8 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 57 101 4.9 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 58 102 4.9 -9 684.70 -66.3 -64.8 -66.4 55 -99 SPO 1997 04 04 00 59 101 5.1 -9 684.70 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 00 99 5.1 -9 684.70 -66.3 -64.7 -66.3 56 0 SPO 1997 04 04 01 01 98 5.2 -9 684.70 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 02 97 5.2 -9 684.70 -66.3 -64.6 -66.3 57 -99 SPO 1997 04 04 01 03 98 5.1 -9 684.70 -66.3 -64.6 -66.3 56 -99 SPO 1997 04 04 01 04 98 5.1 -9 684.70 -66.2 -64.5 -66.3 55 -99 SPO 1997 04 04 01 05 98 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 06 99 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 07 100 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 08 100 5.1 -9 684.70 -66.2 -64.4 -66.3 53 -99 SPO 1997 04 04 01 09 99 5.0 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 10 98 5.1 -9 684.70 -66.2 -64.4 -66.2 56 -99 SPO 1997 04 04 01 11 98 5.2 -9 684.70 -66.1 -64.5 -66.2 55 -99 SPO 1997 04 04 01 12 97 5.1 -9 684.70 -66.2 -64.5 -66.2 56 -99 SPO 1997 04 04 01 13 97 5.2 -9 684.70 -66.2 -64.5 -66.2 57 -99 SPO 1997 04 04 01 14 97 5.4 -9 684.70 -66.2 -64.6 -66.2 57 -99 SPO 1997 04 04 01 15 97 5.5 -9 684.70 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 16 97 5.6 -9 684.70 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 17 96 5.5 -9 684.60 -66.2 -64.6 -66.2 56 -99 SPO 1997 04 04 01 18 95 5.5 -9 684.60 -66.2 -64.6 -66.2 57 -99 SPO 1997 04 04 01 19 94 5.5 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 20 95 5.4 -9 684.60 -66.1 -64.6 -66.2 55 -99 SPO 1997 04 04 01 21 95 5.3 -9 684.60 -66.1 -64.7 -66.2 55 -99 SPO 1997 04 04 01 22 94 5.2 -9 684.70 -66.1 -64.8 -66.2 56 -99 SPO 1997 04 04 01 23 94 5.2 -9 684.60 -66.1 -64.8 -66.2 57 -99 SPO 1997 04 04 01 24 95 5.2 -9 684.60 -66.1 -64.8 -66.2 57 -99 SPO 1997 04 04 01 25 95 5.3 -9 684.60 -66.2 -64.9 -66.3 58 -99 SPO 1997 04 04 01 26 94 5.2 -9 684.70 -66.2 -64.9 -66.3 58 -99 SPO 1997 04 04 01 27 93 5.2 -9 684.70 -66.2 -64.8 -66.3 57 -99 SPO 1997 04 04 01 28 93 5.2 -9 684.70 -66.2 -64.8 -66.3 57 -99 SPO 1997 04 04 01 29 92 5.3 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 30 92 5.4 -9 684.70 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 31 91 5.4 -9 684.70 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 32 90 5.4 -9 684.60 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 33 90 5.4 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 34 90 5.4 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 35 91 5.4 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 36 90 5.4 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 37 89 5.3 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 38 88 5.3 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 39 86 5.4 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 40 86 5.4 -9 684.60 -66.3 -64.6 -66.3 57 -99 SPO 1997 04 04 01 41 86 5.3 -9 684.60 -66.2 -64.6 -66.3 55 -99 SPO 1997 04 04 01 42 86 5.4 -9 684.60 -66.2 -64.5 -66.3 -99 -99 SPO 1997 04 04 01 43 87 5.4 -9 684.60 -66.2 -64.6 -66.3 -99 -99 SPO 1997 04 04 01 44 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 04 01 45 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 04 01 46 -999 -99.9 -9 684.60 -66.3 -64.6 -66.4 -99 -99 SPO 1997 04 04 01 47 90 5.3 -9 684.60 -66.3 -64.7 -66.3 -99 -99 SPO 1997 04 04 01 48 90 5.2 -9 684.60 -66.3 -64.7 -66.4 58 -99 SPO 1997 04 04 01 49 90 5.2 -9 684.60 -66.2 -64.7 -66.4 57 -99 SPO 1997 04 04 01 50 88 5.2 -9 684.60 -66.3 -64.8 -66.4 57 -99 SPO 1997 04 04 01 51 87 5.2 -9 684.60 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 52 86 5.2 -9 684.60 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 53 85 5.3 -9 684.50 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 54 85 5.3 -9 684.60 -66.3 -64.7 -66.4 57 -99 SPO 1997 04 04 01 55 87 5.3 -9 684.60 -66.3 -64.7 -66.4 56 -99 SPO 1997 04 04 01 56 87 5.2 -9 684.60 -66.3 -64.7 -66.4 56 -99 SPO 1997 04 04 01 57 88 5.0 -9 684.60 -66.3 -64.7 -66.4 57 -99 SPO 1997 04 04 01 58 88 4.8 -9 684.60 -66.3 -64.7 -66.4 58 -99 SPO 1997 04 04 01 59 88 4.5 -9 684.60 -66.4 -64.8 -66.5 59 -99 SPO 1997 04 04 02 00 88 4.4 -9 684.60 -66.4 -64.7 -66.5 58 0 SPO 1997 04 04 02 01 88 4.4 -9 684.70 -66.4 -64.8 -66.5 58 -99 SPO 1997 04 04 02 02 89 4.3 -9 684.70 -66.4 -64.8 -66.5 57 -99 SPO 1997 04 04 02 03 90 4.3 -9 684.60 -66.4 -64.7 -66.5 56 -99 SPO 1997 04 04 02 04 90 4.3 -9 684.60 -66.4 -64.8 -66.5 55 -99 SPO 1997 04 04 02 05 90 4.3 -9 684.60 -66.4 -64.8 -66.5 54 -99 SPO 1997 04 04 02 06 90 4.5 -9 684.60 -66.5 -64.8 -66.5 55 -99 SPO 1997 04 04 02 07 91 4.6 -9 684.60 -66.5 -64.8 -66.6 55 -99 SPO 1997 04 04 02 08 91 4.7 -9 684.60 -66.5 -64.7 -66.6 55 -99 SPO 1997 04 04 02 09 91 4.7 -9 684.60 -66.5 -64.7 -66.5 55 -99 SPO 1997 04 04 02 10 89 4.7 -9 684.60 -66.5 -64.7 -66.6 56 -99 SPO 1997 04 04 02 11 87 4.6 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 12 88 4.6 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 13 88 4.5 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 14 90 4.5 -9 684.60 -66.6 -64.7 -66.6 57 -99 SPO 1997 04 04 02 15 91 4.5 -9 684.60 -66.5 -64.7 -66.6 55 -99 SPO 1997 04 04 02 16 91 4.5 -9 684.60 -66.6 -64.6 -66.6 55 -99 SPO 1997 04 04 02 17 92 4.4 -9 684.70 -66.6 -64.6 -66.7 55 -99 SPO 1997 04 04 02 18 93 4.3 -9 684.70 -66.6 -64.6 -66.7 54 -99 SPO 1997 04 04 02 19 95 4.3 -9 684.70 -66.6 -64.6 -66.7 54 -99 SPO 1997 04 04 02 20 96 4.3 -9 684.70 -66.6 -64.7 -66.6 54 -99 SPO 1997 04 04 02 21 98 4.1 -9 684.70 -66.6 -64.7 -66.6 55 -99 SPO 1997 04 04 02 22 99 4.0 -9 684.70 -66.6 -64.7 -66.7 55 -99 SPO 1997 04 04 02 23 101 4.0 -9 684.70 -66.6 -64.8 -66.7 55 -99 SPO 1997 04 04 02 24 102 3.9 -9 684.70 -66.6 -64.8 -66.7 56 -99 SPO 1997 04 04 02 25 105 3.8 -9 684.70 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 02 26 106 3.8 -9 684.70 -66.7 -64.9 -66.7 56 -99 SPO 1997 04 04 02 27 106 3.9 -9 684.70 -66.7 -64.9 -66.8 56 -99 SPO 1997 04 04 02 28 106 4.0 -9 684.80 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 29 107 4.0 -9 684.70 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 30 107 4.1 -9 684.80 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 31 105 4.1 -9 684.70 -66.7 -64.9 -66.7 55 -99 SPO 1997 04 04 02 32 103 4.1 -9 684.70 -66.7 -64.9 -66.7 55 -99 SPO 1997 04 04 02 33 101 4.2 -9 684.70 -66.7 -64.9 -66.7 54 -99 SPO 1997 04 04 02 34 100 4.3 -9 684.70 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 02 35 101 4.2 -9 684.70 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 02 36 101 4.3 -9 684.70 -66.7 -65.0 -66.7 57 -99 SPO 1997 04 04 02 37 98 4.4 -9 684.70 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 02 38 97 4.5 -9 684.70 -66.6 -64.9 -66.7 56 -99 SPO 1997 04 04 02 39 97 4.5 -9 684.70 -66.6 -65.0 -66.6 57 -99 SPO 1997 04 04 02 40 96 4.7 -9 684.70 -66.5 -65.0 -66.6 56 -99 SPO 1997 04 04 02 41 96 4.8 -9 684.70 -66.5 -65.0 -66.6 55 -99 SPO 1997 04 04 02 42 96 4.9 -9 684.70 -66.4 -64.9 -66.6 54 -99 SPO 1997 04 04 02 43 94 5.0 -9 684.70 -66.4 -65.0 -66.6 55 -99 SPO 1997 04 04 02 44 93 5.0 -9 684.70 -66.4 -65.0 -66.6 57 -99 SPO 1997 04 04 02 45 92 4.9 -9 684.70 -66.4 -65.0 -66.5 58 -99 SPO 1997 04 04 02 46 92 4.9 -9 684.70 -66.4 -65.1 -66.5 58 -99 SPO 1997 04 04 02 47 93 4.9 -9 684.70 -66.4 -65.1 -66.5 57 -99 SPO 1997 04 04 02 48 92 4.9 -9 684.70 -66.4 -65.2 -66.5 58 -99 SPO 1997 04 04 02 49 91 4.9 -9 684.70 -66.4 -65.2 -66.5 59 -99 SPO 1997 04 04 02 50 90 4.9 -9 684.70 -66.4 -65.1 -66.5 59 -99 SPO 1997 04 04 02 51 89 4.9 -9 684.70 -66.4 -65.1 -66.5 60 -99 SPO 1997 04 04 02 52 90 5.0 -9 684.70 -66.4 -65.1 -66.5 59 -99 SPO 1997 04 04 02 53 90 5.0 -9 684.70 -66.4 -65.1 -66.6 59 -99 SPO 1997 04 04 02 54 88 5.1 -9 684.70 -66.4 -65.1 -66.6 58 -99 SPO 1997 04 04 02 55 87 5.1 -9 684.70 -66.4 -65.0 -66.6 59 -99 SPO 1997 04 04 02 56 86 5.1 -9 684.70 -66.4 -65.0 -66.6 58 -99 SPO 1997 04 04 02 57 86 5.2 -9 684.70 -66.5 -64.9 -66.6 59 -99 SPO 1997 04 04 02 58 86 5.3 -9 684.70 -66.5 -64.9 -66.6 59 -99 SPO 1997 04 04 02 59 86 5.4 -9 684.70 -66.5 -64.9 -66.6 60 -99 SPO 1997 04 04 03 00 86 5.5 -9 684.70 -66.5 -64.8 -66.6 59 0 SPO 1997 04 04 03 01 86 5.5 -9 684.70 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 02 86 5.4 -9 684.70 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 03 87 5.3 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 04 88 5.2 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 05 90 5.0 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 06 91 5.0 -9 684.80 -66.6 -64.8 -66.6 58 -99 SPO 1997 04 04 03 07 91 4.9 -9 684.80 -66.6 -64.9 -66.7 59 -99 SPO 1997 04 04 03 08 91 4.9 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 09 92 4.8 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 10 92 4.9 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 11 91 5.0 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 12 91 5.0 -9 684.80 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 03 13 90 5.0 -9 684.80 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 03 14 91 4.9 -9 684.90 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 03 15 92 4.8 -9 684.90 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 03 16 94 4.7 -9 684.90 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 03 17 94 4.7 -9 684.90 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 03 18 94 4.7 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 19 93 4.7 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 20 92 4.8 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 21 92 4.9 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 22 92 4.9 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 23 92 4.9 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 24 91 4.7 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 25 93 4.5 -9 685.00 -66.5 -64.9 -66.7 57 -99 SPO 1997 04 04 03 26 95 4.3 -9 685.00 -66.5 -65.0 -66.6 57 -99 SPO 1997 04 04 03 27 96 4.1 -9 685.00 -66.5 -65.0 -66.7 57 -99 SPO 1997 04 04 03 28 95 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 29 95 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 30 94 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 31 95 4.1 -9 685.00 -66.5 -65.2 -66.7 58 -99 SPO 1997 04 04 03 32 96 4.1 -9 685.00 -66.6 -65.2 -66.7 60 -99 SPO 1997 04 04 03 33 97 4.1 -9 685.00 -66.6 -65.2 -66.7 60 -99 SPO 1997 04 04 03 34 98 4.0 -9 685.00 -66.6 -65.3 -66.7 59 -99 SPO 1997 04 04 03 35 98 3.9 -9 685.00 -66.6 -65.3 -66.7 58 -99 SPO 1997 04 04 03 36 99 3.9 -9 685.00 -66.6 -65.3 -66.8 57 -99 SPO 1997 04 04 03 37 98 4.0 -9 685.00 -66.7 -65.3 -66.8 57 -99 SPO 1997 04 04 03 38 98 4.2 -9 685.00 -66.7 -65.3 -66.8 57 -99 SPO 1997 04 04 03 39 98 4.3 -9 685.00 -66.8 -65.3 -66.9 56 -99 SPO 1997 04 04 03 40 101 4.3 -9 685.00 -66.8 -65.2 -66.9 56 -99 SPO 1997 04 04 03 41 103 4.1 -9 685.00 -66.8 -65.2 -66.8 57 -99 SPO 1997 04 04 03 42 105 4.0 -9 685.10 -66.8 -65.2 -66.9 58 -99 SPO 1997 04 04 03 43 107 4.0 -9 685.10 -66.8 -65.2 -66.9 57 -99 SPO 1997 04 04 03 44 108 3.8 -9 685.10 -66.8 -65.3 -66.9 56 -99 SPO 1997 04 04 03 45 109 3.8 -9 685.20 -66.9 -65.3 -66.9 57 -99 SPO 1997 04 04 03 46 111 3.8 -9 685.20 -66.9 -65.3 -66.9 57 -99 SPO 1997 04 04 03 47 112 3.9 -9 685.20 -66.9 -65.3 -66.9 56 -99 SPO 1997 04 04 03 48 111 4.0 -9 685.20 -66.9 -65.3 -67.0 56 -99 SPO 1997 04 04 03 49 109 4.2 -9 685.20 -66.9 -65.3 -66.9 56 -99 SPO 1997 04 04 03 50 108 4.2 -9 685.20 -66.8 -65.2 -66.9 55 -99 SPO 1997 04 04 03 51 107 4.2 -9 685.20 -66.8 -65.2 -66.8 56 -99 SPO 1997 04 04 03 52 104 4.2 -9 685.20 -66.7 -65.2 -66.8 56 -99 SPO 1997 04 04 03 53 102 4.4 -9 685.20 -66.6 -65.1 -66.8 57 -99 SPO 1997 04 04 03 54 100 4.5 -9 685.20 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 03 55 101 4.6 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 56 102 4.5 -9 685.20 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 57 102 4.6 -9 685.20 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 58 102 4.6 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 59 101 4.7 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 00 101 4.7 -9 685.20 -66.6 -65.0 -66.7 57 0 SPO 1997 04 04 04 01 101 4.8 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 02 101 5.0 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 03 100 5.0 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 04 100 4.9 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 05 100 4.7 -9 685.30 -66.5 -65.0 -66.7 57 -99 SPO 1997 04 04 04 06 99 4.6 -9 685.30 -66.6 -65.1 -66.7 59 -99 SPO 1997 04 04 04 07 97 4.6 -9 685.30 -66.6 -65.1 -66.7 58 -99 SPO 1997 04 04 04 08 95 4.5 -9 685.30 -66.6 -65.1 -66.7 58 -99 SPO 1997 04 04 04 09 95 4.6 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 10 93 4.8 -9 685.30 -66.6 -64.9 -66.8 57 -99 SPO 1997 04 04 04 11 91 4.9 -9 685.30 -66.6 -64.8 -66.8 57 -99 SPO 1997 04 04 04 12 91 5.0 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 13 91 5.0 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 14 91 4.9 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 15 91 4.9 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 16 92 4.9 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 17 92 4.8 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 18 92 4.8 -9 685.30 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 04 19 91 4.9 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 20 91 4.9 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 21 90 4.9 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 22 90 4.9 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 23 89 4.8 -9 685.30 -66.6 -64.9 -66.7 56 -99 SPO 1997 04 04 04 24 90 4.6 -9 685.30 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 04 25 91 4.6 -9 685.30 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 04 26 91 4.5 -9 685.30 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 04 27 91 4.5 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 28 90 4.7 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 29 89 4.8 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 30 89 4.8 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 31 90 4.7 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 32 90 4.6 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 33 90 4.6 -9 685.40 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 34 88 4.5 -9 685.40 -66.6 -65.2 -66.7 57 -99 SPO 1997 04 04 04 35 87 4.6 -9 685.40 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 36 86 4.6 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 37 86 4.7 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 38 86 4.8 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 39 85 4.9 -9 685.40 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 40 84 5.0 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 41 84 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 42 84 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 43 83 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 44 82 4.9 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 45 82 4.8 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 46 83 4.7 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 47 83 4.7 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 48 83 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 49 83 5.0 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 50 82 5.0 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 51 82 4.8 -9 685.40 -66.5 -64.8 -66.6 58 -99 SPO 1997 04 04 04 52 81 4.8 -9 685.40 -66.5 -64.7 -66.6 59 -99 SPO 1997 04 04 04 53 82 4.8 -9 685.40 -66.5 -64.7 -66.6 58 -99 SPO 1997 04 04 04 54 82 4.9 -9 685.40 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 04 55 83 4.9 -9 685.40 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 04 56 84 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 57 85 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 58 85 4.7 -9 685.40 -66.6 -64.8 -66.6 58 -99 SPO 1997 04 04 04 59 85 4.7 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 00 86 4.8 -9 685.40 -66.6 -64.8 -66.7 58 0 SPO 1997 04 04 05 01 87 4.8 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 02 90 4.8 -9 685.50 -66.6 -64.8 -66.7 59 -99 SPO 1997 04 04 05 03 90 4.7 -9 685.50 -66.6 -64.7 -66.7 59 -99 SPO 1997 04 04 05 04 89 4.6 -9 685.50 -66.6 -64.7 -66.7 59 -99 SPO 1997 04 04 05 05 88 4.7 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 06 87 4.7 -9 685.40 -66.7 -64.8 -66.8 58 -99 SPO 1997 04 04 05 07 85 4.8 -9 685.40 -66.7 -64.8 -66.8 57 -99 SPO 1997 04 04 05 08 85 4.8 -9 685.40 -66.7 -64.7 -66.8 56 -99 SPO 1997 04 04 05 09 85 4.9 -9 685.40 -66.7 -64.6 -66.8 56 -99 SPO 1997 04 04 05 10 84 4.9 -9 685.40 -66.7 -64.5 -66.8 56 -99 SPO 1997 04 04 05 11 84 5.0 -9 685.40 -66.7 -64.5 -66.8 56 -99 SPO 1997 04 04 05 12 84 4.9 -9 685.40 -66.7 -64.5 -66.8 57 -99 SPO 1997 04 04 05 13 83 4.9 -9 685.40 -66.7 -64.4 -66.8 57 -99 SPO 1997 04 04 05 14 82 4.9 -9 685.40 -66.8 -64.4 -66.8 59 -99 SPO 1997 04 04 05 15 81 4.9 -9 685.40 -66.7 -64.3 -66.8 58 -99 SPO 1997 04 04 05 16 81 4.9 -9 685.40 -66.7 -64.3 -66.8 58 -99 SPO 1997 04 04 05 17 82 5.0 -9 685.40 -66.7 -64.2 -66.8 57 -99 SPO 1997 04 04 05 18 82 5.1 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 19 83 5.1 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 20 82 5.0 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 21 83 5.1 -9 685.40 -66.8 -64.1 -66.9 56 -99 SPO 1997 04 04 05 22 82 5.1 -9 685.40 -66.8 -64.1 -66.8 56 -99 SPO 1997 04 04 05 23 83 5.1 -9 685.40 -66.8 -64.2 -66.9 56 -99 SPO 1997 04 04 05 24 83 5.0 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 25 83 5.0 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 26 83 4.9 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 27 84 4.9 -9 685.50 -66.9 -64.2 -66.9 59 -99 SPO 1997 04 04 05 28 84 4.8 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 05 29 84 4.7 -9 685.50 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 30 85 4.6 -9 685.50 -66.8 -64.1 -66.9 57 -99 SPO 1997 04 04 05 31 88 4.6 -9 685.50 -66.8 -64.0 -66.9 56 -99 SPO 1997 04 04 05 32 88 4.6 -9 685.50 -66.8 -63.9 -66.9 56 -99 SPO 1997 04 04 05 33 88 4.6 -9 685.50 -66.9 -63.8 -66.9 57 -99 SPO 1997 04 04 05 34 88 4.7 -9 685.50 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 35 87 4.8 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 36 88 4.9 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 37 88 4.9 -9 685.40 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 38 89 4.9 -9 685.40 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 39 89 5.0 -9 685.40 -66.9 -63.6 -67.0 58 -99 SPO 1997 04 04 05 40 89 5.1 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 41 88 5.1 -9 685.40 -66.9 -63.7 -67.0 56 -99 SPO 1997 04 04 05 42 87 5.3 -9 685.40 -66.9 -63.6 -67.0 56 -99 SPO 1997 04 04 05 43 87 5.5 -9 685.40 -66.9 -63.5 -66.9 56 -99 SPO 1997 04 04 05 44 87 5.4 -9 685.30 -66.9 -63.4 -66.9 56 -99 SPO 1997 04 04 05 45 87 5.4 -9 685.30 -66.9 -63.4 -67.0 57 -99 SPO 1997 04 04 05 46 87 5.4 -9 685.40 -66.8 -63.5 -66.9 57 -99 SPO 1997 04 04 05 47 87 5.4 -9 685.40 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 05 48 87 5.4 -9 685.40 -66.8 -63.5 -66.8 59 -99 SPO 1997 04 04 05 49 87 5.3 -9 685.40 -66.8 -63.6 -66.8 59 -99 SPO 1997 04 04 05 50 88 5.2 -9 685.40 -66.8 -63.7 -66.8 59 -99 SPO 1997 04 04 05 51 89 5.1 -9 685.40 -66.8 -63.8 -66.8 58 -99 SPO 1997 04 04 05 52 91 5.0 -9 685.50 -66.8 -63.8 -66.8 57 -99 SPO 1997 04 04 05 53 91 4.9 -9 685.50 -66.8 -64.0 -66.8 57 -99 SPO 1997 04 04 05 54 93 4.9 -9 685.50 -66.8 -64.0 -66.8 56 -99 SPO 1997 04 04 05 55 93 4.9 -9 685.50 -66.8 -64.1 -66.8 56 -99 SPO 1997 04 04 05 56 93 4.9 -9 685.50 -66.8 -64.2 -66.8 56 -99 SPO 1997 04 04 05 57 93 5.0 -9 685.50 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 58 93 5.0 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 05 59 92 5.0 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 06 00 94 4.9 -9 685.50 -66.8 -64.2 -66.9 59 0 SPO 1997 04 04 06 01 95 4.7 -9 685.60 -66.8 -64.2 -66.9 59 -99 SPO 1997 04 04 06 02 96 4.6 -9 685.60 -66.8 -64.4 -66.9 59 -99 SPO 1997 04 04 06 03 96 4.5 -9 685.60 -66.8 -64.4 -66.9 58 -99 SPO 1997 04 04 06 04 96 4.5 -9 685.60 -66.8 -64.4 -66.8 57 -99 SPO 1997 04 04 06 05 98 4.6 -9 685.60 -66.7 -64.4 -66.8 56 -99 SPO 1997 04 04 06 06 98 4.6 -9 685.60 -66.7 -64.4 -66.8 55 -99 SPO 1997 04 04 06 07 98 4.6 -9 685.60 -66.8 -64.5 -66.8 56 -99 SPO 1997 04 04 06 08 96 4.6 -9 685.60 -66.8 -64.4 -66.9 56 -99 SPO 1997 04 04 06 09 95 4.6 -9 685.60 -66.8 -64.4 -66.9 57 -99 SPO 1997 04 04 06 10 95 4.6 -9 685.60 -66.9 -64.4 -66.9 58 -99 SPO 1997 04 04 06 11 95 4.6 -9 685.60 -66.9 -64.4 -66.9 58 -99 SPO 1997 04 04 06 12 95 4.7 -9 685.60 -66.9 -64.4 -67.0 58 -99 SPO 1997 04 04 06 13 95 4.7 -9 685.60 -66.9 -64.4 -67.0 58 -99 SPO 1997 04 04 06 14 95 4.9 -9 685.60 -66.9 -64.3 -66.9 58 -99 SPO 1997 04 04 06 15 95 4.9 -9 685.60 -66.8 -64.3 -66.9 56 -99 SPO 1997 04 04 06 16 95 5.0 -9 685.60 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 06 17 94 5.1 -9 685.60 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 18 93 5.1 -9 685.50 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 19 92 5.2 -9 685.50 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 20 93 5.3 -9 685.50 -66.7 -64.1 -66.8 57 -99 SPO 1997 04 04 06 21 93 5.3 -9 685.50 -66.7 -64.1 -66.8 58 -99 SPO 1997 04 04 06 22 93 5.2 -9 685.50 -66.7 -64.1 -66.8 59 -99 SPO 1997 04 04 06 23 92 5.1 -9 685.50 -66.7 -64.2 -66.8 59 -99 SPO 1997 04 04 06 24 92 4.8 -9 685.60 -66.8 -64.3 -66.8 60 -99 SPO 1997 04 04 06 25 93 4.7 -9 685.60 -66.8 -64.4 -66.9 60 -99 SPO 1997 04 04 06 26 93 4.7 -9 685.60 -66.8 -64.4 -66.9 59 -99 SPO 1997 04 04 06 27 94 4.7 -9 685.60 -66.8 -64.4 -66.9 58 -99 SPO 1997 04 04 06 28 94 4.7 -9 685.60 -66.8 -64.4 -66.9 57 -99 SPO 1997 04 04 06 29 94 4.7 -9 685.60 -66.8 -64.4 -66.9 56 -99 SPO 1997 04 04 06 30 93 4.7 -9 685.50 -66.9 -64.4 -67.0 57 -99 SPO 1997 04 04 06 31 92 4.7 -9 685.50 -66.9 -64.3 -67.0 57 -99 SPO 1997 04 04 06 32 92 4.8 -9 685.50 -66.9 -64.2 -67.0 57 -99 SPO 1997 04 04 06 33 91 4.9 -9 685.50 -66.9 -64.1 -67.0 57 -99 SPO 1997 04 04 06 34 90 5.1 -9 685.50 -66.9 -64.1 -67.0 57 -99 SPO 1997 04 04 06 35 89 5.2 -9 685.50 -66.9 -64.1 -67.0 58 -99 SPO 1997 04 04 06 36 87 5.3 -9 685.50 -67.0 -64.1 -67.0 59 -99 SPO 1997 04 04 06 37 86 5.4 -9 685.50 -66.9 -64.1 -67.0 58 -99 SPO 1997 04 04 06 38 85 5.4 -9 685.50 -66.9 -64.0 -67.0 58 -99 SPO 1997 04 04 06 39 85 5.4 -9 685.50 -66.9 -63.9 -66.9 57 -99 SPO 1997 04 04 06 40 86 5.3 -9 685.50 -66.9 -63.9 -66.9 57 -99 SPO 1997 04 04 06 41 86 5.3 -9 685.50 -66.8 -63.8 -66.9 56 -99 SPO 1997 04 04 06 42 85 5.2 -9 685.50 -66.8 -63.8 -66.9 56 -99 SPO 1997 04 04 06 43 85 5.2 -9 685.50 -66.8 -63.8 -66.9 57 -99 SPO 1997 04 04 06 44 85 5.2 -9 685.50 -66.8 -63.7 -66.8 57 -99 SPO 1997 04 04 06 45 84 5.2 -9 685.60 -66.8 -63.7 -66.8 58 -99 SPO 1997 04 04 06 46 82 5.2 -9 685.60 -66.7 -63.6 -66.8 58 -99 SPO 1997 04 04 06 47 81 5.2 -9 685.50 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 48 80 5.3 -9 685.50 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 49 79 5.3 -9 685.60 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 50 79 5.3 -9 685.60 -66.7 -63.5 -66.8 57 -99 SPO 1997 04 04 06 51 79 5.1 -9 685.60 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 52 80 5.0 -9 685.70 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 53 80 5.0 -9 685.70 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 54 81 5.0 -9 685.70 -66.7 -63.5 -66.8 57 -99 SPO 1997 04 04 06 55 80 5.0 -9 685.70 -66.7 -63.4 -66.8 58 -99 SPO 1997 04 04 06 56 80 5.1 -9 685.70 -66.7 -63.4 -66.8 58 -99 SPO 1997 04 04 06 57 79 5.2 -9 685.70 -66.7 -63.3 -66.8 58 -99 SPO 1997 04 04 06 58 78 5.2 -9 685.70 -66.7 -63.2 -66.8 57 -99 SPO 1997 04 04 06 59 77 5.2 -9 685.70 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 07 00 78 5.1 -9 685.70 -66.8 -63.1 -66.8 57 0 SPO 1997 04 04 07 01 80 5.0 -9 685.70 -66.8 -63.2 -66.8 56 -99 SPO 1997 04 04 07 02 79 4.9 -9 685.70 -66.8 -63.2 -66.8 55 -99 SPO 1997 04 04 07 03 79 4.8 -9 685.70 -66.8 -63.2 -66.8 56 -99 SPO 1997 04 04 07 04 79 4.7 -9 685.70 -66.8 -63.3 -66.9 56 -99 SPO 1997 04 04 07 05 79 4.7 -9 685.70 -66.8 -63.3 -66.9 56 -99 SPO 1997 04 04 07 06 79 4.7 -9 685.70 -66.8 -63.3 -66.9 57 -99 SPO 1997 04 04 07 07 79 4.7 -9 685.80 -66.8 -63.4 -66.9 58 -99 SPO 1997 04 04 07 08 80 4.6 -9 685.80 -66.8 -63.4 -66.9 58 -99 SPO 1997 04 04 07 09 83 4.6 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 10 83 4.6 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 11 82 4.5 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 12 81 4.6 -9 685.80 -66.9 -63.5 -66.9 57 -99 SPO 1997 04 04 07 13 80 4.7 -9 685.80 -66.9 -63.5 -67.0 56 -99 SPO 1997 04 04 07 14 80 4.8 -9 685.80 -66.9 -63.4 -67.0 56 -99 SPO 1997 04 04 07 15 82 4.9 -9 685.80 -66.9 -63.3 -67.0 56 -99 SPO 1997 04 04 07 16 83 4.8 -9 685.80 -66.9 -63.3 -67.0 55 -99 SPO 1997 04 04 07 17 84 4.7 -9 685.80 -66.9 -63.3 -67.0 55 -99 SPO 1997 04 04 07 18 86 4.5 -9 685.80 -67.0 -63.4 -67.0 56 -99 SPO 1997 04 04 07 19 87 4.3 -9 685.80 -67.0 -63.4 -67.1 57 -99 SPO 1997 04 04 07 20 88 4.3 -9 685.90 -67.0 -63.4 -67.1 57 -99 SPO 1997 04 04 07 21 88 4.2 -9 685.90 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 22 88 4.1 -9 685.90 -67.1 -63.5 -67.1 59 -99 SPO 1997 04 04 07 23 88 4.1 -9 685.90 -67.1 -63.5 -67.2 57 -99 SPO 1997 04 04 07 24 90 4.1 -9 685.90 -67.2 -63.4 -67.2 57 -99 SPO 1997 04 04 07 25 92 3.9 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 26 94 3.8 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 27 96 3.7 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 28 98 3.7 -9 686.10 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 29 100 3.7 -9 686.10 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 30 103 3.8 -9 686.10 -67.0 -63.4 -67.1 56 -99 SPO 1997 04 04 07 31 103 4.0 -9 686.10 -67.0 -63.4 -67.0 57 -99 SPO 1997 04 04 07 32 102 4.1 -9 686.10 -67.0 -63.4 -67.1 58 -99 SPO 1997 04 04 07 33 101 4.1 -9 686.10 -67.1 -63.4 -67.2 59 -99 SPO 1997 04 04 07 34 100 4.1 -9 686.10 -67.1 -63.4 -67.1 59 -99 SPO 1997 04 04 07 35 102 3.8 -9 686.10 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 36 102 3.9 -9 686.10 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 37 102 3.9 -9 686.10 -67.1 -63.4 -67.1 57 -99 SPO 1997 04 04 07 38 103 3.9 -9 686.10 -67.0 -63.4 -67.1 56 -99 SPO 1997 04 04 07 39 105 4.0 -9 686.10 -67.0 -63.4 -67.0 56 -99 SPO 1997 04 04 07 40 108 4.1 -9 686.10 -66.9 -63.5 -67.0 56 -99 SPO 1997 04 04 07 41 112 3.9 -9 686.10 -66.9 -63.5 -67.0 57 -99 SPO 1997 04 04 07 42 115 3.9 -9 686.20 -66.8 -63.6 -66.9 57 -99 SPO 1997 04 04 07 43 113 4.0 -9 686.20 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 44 112 4.3 -9 686.20 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 45 110 4.4 -9 686.10 -66.8 -63.6 -66.9 56 -99 SPO 1997 04 04 07 46 107 4.3 -9 686.10 -66.8 -63.6 -66.9 56 -99 SPO 1997 04 04 07 47 106 4.4 -9 686.10 -66.8 -63.6 -66.9 57 -99 SPO 1997 04 04 07 48 105 4.5 -9 686.10 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 49 105 4.6 -9 686.10 -66.8 -63.6 -66.8 58 -99 SPO 1997 04 04 07 50 106 4.8 -9 686.10 -66.8 -63.5 -66.8 59 -99 SPO 1997 04 04 07 51 106 4.7 -9 686.10 -66.7 -63.5 -66.8 59 -99 SPO 1997 04 04 07 52 105 4.6 -9 686.10 -66.7 -63.5 -66.8 59 -99 SPO 1997 04 04 07 53 105 4.7 -9 686.10 -66.7 -63.5 -66.8 60 -99 SPO 1997 04 04 07 54 101 4.7 -9 686.10 -66.7 -63.4 -66.8 60 -99 SPO 1997 04 04 07 55 100 4.8 -9 686.00 -66.7 -63.4 -66.8 60 -99 SPO 1997 04 04 07 56 99 5.0 -9 686.00 -66.7 -63.3 -66.8 60 -99 SPO 1997 04 04 07 57 98 5.0 -9 686.00 -66.7 -63.3 -66.8 59 -99 SPO 1997 04 04 07 58 98 4.9 -9 686.00 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 07 59 98 4.7 -9 686.10 -66.7 -63.2 -66.8 57 -99 SPO 1997 04 04 08 00 99 4.6 -9 686.10 -66.7 -63.3 -66.8 57 0 SPO 1997 04 04 08 01 99 4.7 -9 686.10 -66.7 -63.4 -66.8 56 -99 SPO 1997 04 04 08 02 99 4.9 -9 686.10 -66.7 -63.3 -66.8 57 -99 SPO 1997 04 04 08 03 98 5.0 -9 686.10 -66.7 -63.3 -66.8 57 -99 SPO 1997 04 04 08 04 97 5.2 -9 686.10 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 08 05 95 5.3 -9 686.10 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 08 06 93 5.4 -9 686.10 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 07 91 5.5 -9 686.00 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 08 90 5.5 -9 686.00 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 09 89 5.4 -9 686.10 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 08 10 89 5.2 -9 686.10 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 08 11 89 5.1 -9 686.10 -66.7 -63.0 -66.8 57 -99 SPO 1997 04 04 08 12 86 5.1 -9 686.10 -66.7 -63.0 -66.8 57 -99 SPO 1997 04 04 08 13 85 5.2 -9 686.10 -66.7 -62.9 -66.8 56 -99 SPO 1997 04 04 08 14 85 5.3 -9 686.10 -66.7 -62.9 -66.8 56 -99 SPO 1997 04 04 08 15 86 5.4 -9 686.10 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 08 16 87 5.5 -9 686.10 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 08 17 86 5.5 -9 686.10 -66.8 -62.9 -66.8 58 -99 SPO 1997 04 04 08 18 87 5.6 -9 686.10 -66.8 -62.8 -66.8 58 -99 SPO 1997 04 04 08 19 87 5.7 -9 686.10 -66.8 -62.6 -66.8 58 -99 SPO 1997 04 04 08 20 87 5.7 -9 686.10 -66.8 -62.5 -66.8 58 -99 SPO 1997 04 04 08 21 89 5.6 -9 686.10 -66.8 -62.4 -66.8 57 -99 SPO 1997 04 04 08 22 88 5.6 -9 686.10 -66.8 -62.2 -66.8 56 -99 SPO 1997 04 04 08 23 87 5.5 -9 686.10 -66.8 -62.2 -66.8 56 -99 SPO 1997 04 04 08 24 87 5.3 -9 686.10 -66.8 -62.2 -66.9 56 -99 SPO 1997 04 04 08 25 89 5.3 -9 686.20 -66.8 -62.1 -66.9 57 -99 SPO 1997 04 04 08 26 89 5.2 -9 686.20 -66.8 -62.2 -66.9 57 -99 SPO 1997 04 04 08 27 88 5.0 -9 686.20 -66.9 -62.4 -66.9 59 -99 SPO 1997 04 04 08 28 89 4.8 -9 686.20 -66.9 -62.6 -66.9 58 -99 SPO 1997 04 04 08 29 91 4.6 -9 686.30 -66.9 -62.8 -66.9 58 -99 SPO 1997 04 04 08 30 91 4.6 -9 686.30 -66.9 -63.1 -67.0 57 -99 SPO 1997 04 04 08 31 92 4.6 -9 686.30 -66.9 -63.2 -67.0 56 -99 SPO 1997 04 04 08 32 93 4.6 -9 686.30 -66.9 -63.2 -67.0 56 -99 SPO 1997 04 04 08 33 94 4.5 -9 686.30 -66.9 -63.1 -67.0 56 -99 SPO 1997 04 04 08 34 94 4.4 -9 686.30 -66.9 -63.1 -67.0 56 -99 SPO 1997 04 04 08 35 93 4.5 -9 686.30 -66.9 -63.0 -67.0 56 -99 SPO 1997 04 04 08 36 91 4.6 -9 686.30 -66.9 -62.9 -67.0 56 -99 SPO 1997 04 04 08 37 90 4.8 -9 686.30 -67.0 -62.8 -67.0 58 -99 SPO 1997 04 04 08 38 90 4.9 -9 686.20 -66.9 -62.5 -67.0 57 -99 SPO 1997 04 04 08 39 89 4.9 -9 686.20 -66.9 -62.3 -67.0 58 -99 SPO 1997 04 04 08 40 89 4.9 -9 686.20 -66.9 -62.4 -67.0 58 -99 SPO 1997 04 04 08 41 89 4.9 -9 686.20 -66.9 -62.2 -67.0 59 -99 SPO 1997 04 04 08 42 89 4.9 -9 686.20 -66.9 -62.2 -67.0 57 -99 SPO 1997 04 04 08 43 89 4.9 -9 686.20 -66.9 -62.4 -66.9 56 -99 SPO 1997 04 04 08 44 88 5.0 -9 686.20 -66.8 -62.4 -66.9 56 -99 SPO 1997 04 04 08 45 88 5.2 -9 686.10 -66.8 -62.2 -66.9 57 -99 SPO 1997 04 04 08 46 86 5.3 -9 686.10 -66.8 -62.1 -66.9 57 -99 SPO 1997 04 04 08 47 86 5.3 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 48 84 5.4 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 49 83 5.5 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 50 83 5.5 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 51 83 5.4 -9 686.10 -66.8 -61.9 -66.9 59 -99 SPO 1997 04 04 08 52 85 5.4 -9 686.10 -66.8 -61.8 -66.9 59 -99 SPO 1997 04 04 08 53 85 5.3 -9 686.10 -66.8 -61.7 -66.9 59 -99 SPO 1997 04 04 08 54 85 5.4 -9 686.10 -66.8 -61.7 -66.9 59 -99 SPO 1997 04 04 08 55 85 5.5 -9 686.10 -66.8 -61.7 -66.9 58 -99 SPO 1997 04 04 08 56 83 5.6 -9 686.10 -66.8 -61.7 -66.9 58 -99 SPO 1997 04 04 08 57 81 5.7 -9 686.10 -66.8 -61.6 -66.9 57 -99 SPO 1997 04 04 08 58 80 5.8 -9 686.10 -66.8 -61.6 -66.8 57 -99 SPO 1997 04 04 08 59 80 5.7 -9 686.10 -66.8 -61.6 -66.8 57 -99 SPO 1997 04 04 09 00 81 5.7 -9 686.10 -66.8 -61.7 -66.8 58 0 SPO 1997 04 04 09 01 83 5.7 -9 686.10 -66.8 -61.7 -66.8 58 -99 SPO 1997 04 04 09 02 82 5.8 -9 686.10 -66.8 -61.7 -66.8 58 -99 SPO 1997 04 04 09 03 83 5.9 -9 686.10 -66.7 -61.7 -66.8 58 -99 SPO 1997 04 04 09 04 83 6.0 -9 686.10 -66.7 -61.6 -66.7 58 -99 SPO 1997 04 04 09 05 81 6.0 -9 686.10 -66.6 -61.6 -66.7 58 -99 SPO 1997 04 04 09 06 80 5.9 -9 686.10 -66.6 -61.6 -66.7 58 -99 SPO 1997 04 04 09 07 79 5.9 -9 686.10 -66.6 -61.7 -66.7 59 -99 SPO 1997 04 04 09 08 79 6.0 -9 686.10 -66.6 -61.7 -66.7 58 -99 SPO 1997 04 04 09 09 79 6.0 -9 686.10 -66.6 -61.7 -66.8 57 -99 SPO 1997 04 04 09 10 79 5.9 -9 686.10 -66.7 -61.8 -66.7 58 -99 SPO 1997 04 04 09 11 79 5.8 -9 686.10 -66.6 -61.8 -66.7 57 -99 SPO 1997 04 04 09 12 80 5.8 -9 686.10 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 13 81 5.8 -9 686.10 -66.6 -62.0 -66.7 57 -99 SPO 1997 04 04 09 14 83 5.6 -9 686.20 -66.6 -62.0 -66.6 57 -99 SPO 1997 04 04 09 15 85 5.3 -9 686.20 -66.5 -62.0 -66.6 57 -99 SPO 1997 04 04 09 16 86 5.2 -9 686.20 -66.5 -62.0 -66.6 57 -99 SPO 1997 04 04 09 17 87 5.1 -9 686.20 -66.5 -62.0 -66.6 58 -99 SPO 1997 04 04 09 18 86 5.0 -9 686.20 -66.5 -62.1 -66.6 57 -99 SPO 1997 04 04 09 19 84 5.1 -9 686.20 -66.5 -62.1 -66.7 57 -99 SPO 1997 04 04 09 20 83 5.3 -9 686.20 -66.6 -62.1 -66.7 58 -99 SPO 1997 04 04 09 21 82 5.5 -9 686.20 -66.6 -62.0 -66.7 58 -99 SPO 1997 04 04 09 22 81 5.6 -9 686.20 -66.6 -62.0 -66.7 58 -99 SPO 1997 04 04 09 23 80 5.8 -9 686.20 -66.6 -61.9 -66.7 58 -99 SPO 1997 04 04 09 24 80 5.9 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 25 79 5.8 -9 686.10 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 26 78 5.8 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 27 79 5.6 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 28 79 5.5 -9 686.20 -66.7 -61.9 -66.7 58 -99 SPO 1997 04 04 09 29 78 5.5 -9 686.20 -66.7 -62.0 -66.7 58 -99 SPO 1997 04 04 09 30 78 5.5 -9 686.20 -66.7 -62.0 -66.7 58 -99 SPO 1997 04 04 09 31 78 5.4 -9 686.20 -66.7 -62.0 -66.7 57 -99 SPO 1997 04 04 09 32 78 5.2 -9 686.20 -66.6 -62.0 -66.7 57 -99 SPO 1997 04 04 09 33 79 5.2 -9 686.30 -66.6 -62.0 -66.8 57 -99 SPO 1997 04 04 09 34 79 5.1 -9 686.30 -66.7 -62.0 -66.8 57 -99 SPO 1997 04 04 09 35 80 5.0 -9 686.30 -66.7 -62.0 -66.8 57 -99 SPO 1997 04 04 09 36 80 5.0 -9 686.30 -66.7 -61.9 -66.8 57 -99 SPO 1997 04 04 09 37 81 4.9 -9 686.30 -66.7 -61.9 -66.8 57 -99 SPO 1997 04 04 09 38 82 4.6 -9 686.30 -66.8 -61.9 -66.8 58 -99 SPO 1997 04 04 09 39 83 4.5 -9 686.40 -66.8 -61.9 -66.8 57 -99 SPO 1997 04 04 09 40 86 4.5 -9 686.40 -66.8 -61.9 -66.9 56 -99 SPO 1997 04 04 09 41 88 4.4 -9 686.40 -66.8 -62.0 -66.9 56 -99 SPO 1997 04 04 09 42 87 4.4 -9 686.40 -66.9 -62.2 -67.0 58 -99 SPO 1997 04 04 09 43 87 4.4 -9 686.40 -67.0 -62.2 -67.0 58 -99 SPO 1997 04 04 09 44 90 4.2 -9 686.40 -67.0 -62.2 -67.1 58 -99 SPO 1997 04 04 09 45 94 4.0 -9 686.50 -67.1 -62.3 -67.1 58 -99 SPO 1997 04 04 09 46 95 4.0 -9 686.50 -67.2 -62.4 -67.2 59 -99 SPO 1997 04 04 09 47 96 4.0 -9 686.50 -67.2 -62.5 -67.2 58 -99 SPO 1997 04 04 09 48 98 3.8 -9 686.50 -67.3 -62.5 -67.3 59 -99 SPO 1997 04 04 09 49 100 3.7 -9 686.60 -67.3 -62.6 -67.3 58 -99 SPO 1997 04 04 09 50 102 3.9 -9 686.60 -67.4 -62.7 -67.3 58 -99 SPO 1997 04 04 09 51 104 4.0 -9 686.60 -67.4 -62.7 -67.4 57 -99 SPO 1997 04 04 09 52 105 3.9 -9 686.60 -67.4 -62.7 -67.4 56 -99 SPO 1997 04 04 09 53 107 3.9 -9 686.60 -67.5 -62.8 -67.5 56 -99 SPO 1997 04 04 09 54 110 3.8 -9 686.70 -67.5 -62.8 -67.4 56 -99 SPO 1997 04 04 09 55 113 3.5 -9 686.70 -67.5 -63.0 -67.4 56 -99 SPO 1997 04 04 09 56 129 2.6 -9 686.80 -67.4 -63.4 -67.3 56 -99 SPO 1997 04 04 09 57 145 1.5 -9 686.80 -67.2 -64.0 -67.3 55 -99 SPO 1997 04 04 09 58 140 2.2 -9 686.80 -67.3 -64.4 -67.4 56 -99 SPO 1997 04 04 09 59 130 2.9 -9 686.80 -67.2 -64.3 -67.3 56 -99 SPO 1997 04 04 10 00 131 3.1 -9 686.80 -66.9 -64.2 -67.0 56 0 SPO 1997 04 04 10 01 134 2.9 -9 686.80 -66.6 -64.2 -66.8 56 -99 SPO 1997 04 04 10 02 131 2.9 -9 686.80 -66.4 -64.4 -66.8 57 -99 SPO 1997 04 04 10 03 129 3.0 -9 686.80 -66.4 -64.5 -66.8 57 -99 SPO 1997 04 04 10 04 132 2.8 -9 686.90 -66.4 -64.6 -66.8 57 -99 SPO 1997 04 04 10 05 133 2.7 -9 686.90 -66.4 -64.6 -66.8 57 -99 SPO 1997 04 04 10 06 124 3.0 -9 686.90 -66.4 -64.7 -66.8 58 -99 SPO 1997 04 04 10 07 115 3.4 -9 686.90 -66.4 -64.5 -66.8 58 -99 SPO 1997 04 04 10 08 113 3.6 -9 686.80 -66.5 -64.3 -66.8 59 -99 SPO 1997 04 04 10 09 112 3.5 -9 686.80 -66.6 -64.2 -66.9 59 -99 SPO 1997 04 04 10 10 111 3.6 -9 686.90 -66.7 -64.2 -66.9 59 -99 SPO 1997 04 04 10 11 111 3.6 -9 686.90 -66.7 -64.2 -66.9 59 -99 SPO 1997 04 04 10 12 114 3.2 -9 686.90 -66.8 -64.2 -67.0 59 -99 SPO 1997 04 04 10 13 123 2.6 -9 687.00 -66.9 -64.4 -67.0 59 -99 SPO 1997 04 04 10 14 131 1.9 -9 687.00 -66.8 -64.6 -67.0 57 -99 SPO 1997 04 04 10 15 129 2.3 -9 687.00 -66.8 -64.8 -67.0 56 -99 SPO 1997 04 04 10 16 126 2.6 -9 687.00 -66.8 -64.9 -67.0 56 -99 SPO 1997 04 04 10 17 121 2.9 -9 687.00 -66.7 -64.9 -66.9 57 -99 SPO 1997 04 04 10 18 116 3.2 -9 687.00 -66.6 -64.8 -66.8 57 -99 SPO 1997 04 04 10 19 111 3.4 -9 687.00 -66.6 -64.7 -66.8 57 -99 SPO 1997 04 04 10 20 107 3.3 -9 687.00 -66.8 -64.6 -66.9 59 -99 SPO 1997 04 04 10 21 105 3.0 -9 686.90 -66.8 -64.7 -67.0 58 -99 SPO 1997 04 04 10 22 103 2.7 -9 687.00 -66.9 -64.8 -67.0 57 -99 SPO 1997 04 04 10 23 101 2.6 -9 687.00 -67.0 -64.9 -67.1 57 -99 SPO 1997 04 04 10 24 101 2.6 -9 687.00 -67.0 -64.9 -67.1 57 -99 SPO 1997 04 04 10 25 100 2.6 -9 687.00 -67.1 -64.8 -67.1 58 -99 SPO 1997 04 04 10 26 94 2.8 -9 686.90 -67.1 -64.8 -67.1 58 -99 SPO 1997 04 04 10 27 91 3.0 -9 686.90 -67.1 -64.6 -67.1 58 -99 SPO 1997 04 04 10 28 91 3.3 -9 686.90 -67.1 -64.4 -67.1 58 -99 SPO 1997 04 04 10 29 90 3.2 -9 686.90 -67.1 -64.2 -67.2 57 -99 SPO 1997 04 04 10 30 88 3.2 -9 686.90 -67.1 -64.1 -67.2 58 -99 SPO 1997 04 04 10 31 88 3.3 -9 686.90 -67.1 -63.9 -67.1 58 -99 SPO 1997 04 04 10 32 89 3.4 -9 686.90 -67.1 -63.8 -67.1 57 -99 SPO 1997 04 04 10 33 89 3.2 -9 687.00 -67.1 -63.7 -67.1 57 -99 SPO 1997 04 04 10 34 90 3.1 -9 687.00 -67.1 -63.6 -67.2 57 -99 SPO 1997 04 04 10 35 93 3.1 -9 687.00 -67.1 -63.6 -67.2 56 -99 SPO 1997 04 04 10 36 93 3.0 -9 687.00 -67.1 -63.6 -67.2 56 -99 SPO 1997 04 04 10 37 92 3.0 -9 687.00 -67.1 -63.6 -67.2 55 -99 SPO 1997 04 04 10 38 90 3.4 -9 686.90 -67.2 -63.6 -67.2 56 -99 SPO 1997 04 04 10 39 88 3.5 -9 686.90 -67.2 -63.6 -67.2 56 -99 SPO 1997 04 04 10 40 87 3.3 -9 686.90 -67.2 -63.5 -67.2 56 -99 SPO 1997 04 04 10 41 85 3.4 -9 687.00 -67.3 -63.6 -67.3 57 -99 SPO 1997 04 04 10 42 84 3.7 -9 686.90 -67.3 -63.5 -67.3 57 -99 SPO 1997 04 04 10 43 82 4.0 -9 686.90 -67.3 -63.4 -67.3 56 -99 SPO 1997 04 04 10 44 81 4.1 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 45 80 4.0 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 46 79 4.0 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 47 79 3.9 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 48 75 3.7 -9 686.90 -67.3 -63.3 -67.4 56 -99 SPO 1997 04 04 10 49 73 3.8 -9 686.90 -67.2 -63.3 -67.3 55 -99 SPO 1997 04 04 10 50 72 4.1 -9 686.90 -67.2 -63.2 -67.3 55 -99 SPO 1997 04 04 10 51 71 4.2 -9 686.90 -67.2 -63.2 -67.2 55 -99 SPO 1997 04 04 10 52 71 4.2 -9 686.90 -67.1 -63.2 -67.1 55 -99 SPO 1997 04 04 10 53 71 4.3 -9 686.90 -67.0 -63.2 -67.1 55 -99 SPO 1997 04 04 10 54 68 4.3 -9 686.90 -66.9 -63.2 -67.0 55 -99 SPO 1997 04 04 10 55 67 4.6 -9 686.80 -66.9 -63.2 -66.9 56 -99 SPO 1997 04 04 10 56 67 4.8 -9 686.80 -66.8 -63.1 -66.9 56 -99 SPO 1997 04 04 10 57 65 4.7 -9 686.80 -66.8 -63.0 -66.9 56 -99 SPO 1997 04 04 10 58 64 4.5 -9 686.80 -66.7 -63.0 -66.9 57 -99 SPO 1997 04 04 10 59 63 4.5 -9 686.80 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 11 00 60 4.0 -9 686.80 -66.7 -62.8 -66.8 58 0 SPO 1997 04 04 11 01 51 3.0 -9 686.80 -66.6 -63.0 -66.8 58 -99 SPO 1997 04 04 11 02 49 2.7 -9 686.80 -66.6 -63.2 -66.8 58 -99 SPO 1997 04 04 11 03 57 2.5 -9 686.90 -66.6 -63.2 -66.7 59 -99 SPO 1997 04 04 11 04 51 2.1 -9 686.90 -66.6 -63.4 -66.8 59 -99 SPO 1997 04 04 11 05 29 1.6 -9 686.90 -66.5 -64.0 -66.7 58 -99 SPO 1997 04 04 11 06 32 1.7 -9 687.00 -66.5 -64.6 -66.6 59 -99 SPO 1997 04 04 11 07 56 2.6 -9 687.00 -66.4 -64.4 -66.6 60 -99 SPO 1997 04 04 11 08 62 3.6 -9 687.00 -66.3 -63.7 -66.5 60 -99 SPO 1997 04 04 11 09 65 4.1 -9 686.90 -66.2 -63.4 -66.4 59 -99 SPO 1997 04 04 11 10 65 4.0 -9 686.90 -66.2 -63.2 -66.4 60 -99 SPO 1997 04 04 11 11 63 3.5 -9 687.00 -66.2 -63.1 -66.4 60 -99 SPO 1997 04 04 11 12 64 3.6 -9 687.00 -66.1 -63.0 -66.3 60 -99 SPO 1997 04 04 11 13 69 3.4 -9 687.00 -66.1 -63.0 -66.3 60 -99 SPO 1997 04 04 11 14 73 2.8 -9 687.10 -66.1 -63.0 -66.3 61 -99 SPO 1997 04 04 11 15 78 2.2 -9 687.20 -66.1 -63.1 -66.4 61 -99 SPO 1997 04 04 11 16 82 1.9 -9 687.20 -66.1 -63.4 -66.4 61 -99 SPO 1997 04 04 11 17 75 1.8 -9 687.20 -66.1 -63.6 -66.4 61 -99 SPO 1997 04 04 11 18 74 2.0 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 19 74 2.0 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 20 70 1.6 -9 687.20 -66.2 -64.0 -66.5 61 -99 SPO 1997 04 04 11 21 68 1.5 -9 687.20 -66.2 -64.3 -66.5 61 -99 SPO 1997 04 04 11 22 61 1.7 -9 687.20 -66.3 -64.5 -66.5 61 -99 SPO 1997 04 04 11 23 55 1.9 -9 687.20 -66.4 -64.6 -66.5 61 -99 SPO 1997 04 04 11 24 54 1.9 -9 687.20 -66.4 -64.6 -66.5 60 -99 SPO 1997 04 04 11 25 56 2.0 -9 687.20 -66.4 -64.6 -66.5 60 -99 SPO 1997 04 04 11 26 52 2.1 -9 687.20 -66.3 -64.6 -66.5 60 -99 SPO 1997 04 04 11 27 55 2.2 -9 687.20 -66.3 -64.6 -66.4 60 -99 SPO 1997 04 04 11 28 63 3.0 -9 687.20 -66.3 -64.3 -66.4 61 -99 SPO 1997 04 04 11 29 68 3.4 -9 687.20 -66.2 -63.7 -66.4 60 -99 SPO 1997 04 04 11 30 69 3.4 -9 687.20 -66.2 -63.4 -66.3 60 -99 SPO 1997 04 04 11 31 70 3.0 -9 687.20 -66.2 -63.4 -66.3 61 -99 SPO 1997 04 04 11 32 64 2.0 -9 687.20 -66.2 -63.6 -66.4 61 -99 SPO 1997 04 04 11 33 63 1.9 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 34 54 1.2 -9 687.30 -66.2 -64.2 -66.4 60 -99 SPO 1997 04 04 11 35 61 1.1 -9 687.30 -66.3 -64.5 -66.4 60 -99 SPO 1997 04 04 11 36 65 1.4 -9 687.30 -66.2 -64.7 -66.4 60 -99 SPO 1997 04 04 11 37 65 1.7 -9 687.20 -66.2 -64.6 -66.4 60 -99 SPO 1997 04 04 11 38 70 2.1 -9 687.30 -66.2 -64.4 -66.4 60 -99 SPO 1997 04 04 11 39 76 2.1 -9 687.20 -66.2 -64.2 -66.4 60 -99 SPO 1997 04 04 11 40 79 1.9 -9 687.30 -66.2 -64.3 -66.4 60 -99 SPO 1997 04 04 11 41 71 2.2 -9 687.20 -66.2 -64.5 -66.4 60 -99 SPO 1997 04 04 11 42 73 2.4 -9 687.20 -66.2 -64.3 -66.4 60 -99 SPO 1997 04 04 11 43 73 2.5 -9 687.20 -66.2 -64.0 -66.4 60 -99 SPO 1997 04 04 11 44 73 2.4 -9 687.20 -66.2 -63.9 -66.4 60 -99 SPO 1997 04 04 11 45 74 2.8 -9 687.20 -66.2 -63.7 -66.4 60 -99 SPO 1997 04 04 11 46 71 2.8 -9 687.20 -66.3 -63.6 -66.4 61 -99 SPO 1997 04 04 11 47 72 2.8 -9 687.20 -66.3 -63.4 -66.5 60 -99 SPO 1997 04 04 11 48 77 2.6 -9 687.20 -66.4 -63.4 -66.6 60 -99 SPO 1997 04 04 11 49 80 2.5 -9 687.30 -66.5 -63.4 -66.6 60 -99 SPO 1997 04 04 11 50 80 2.6 -9 687.30 -66.6 -63.4 -66.7 60 -99 SPO 1997 04 04 11 51 84 2.7 -9 687.30 -66.7 -63.3 -66.7 60 -99 SPO 1997 04 04 11 52 87 2.3 -9 687.30 -66.7 -63.1 -66.8 60 -99 SPO 1997 04 04 11 53 90 1.9 -9 687.40 -66.8 -63.2 -66.8 60 -99 SPO 1997 04 04 11 54 94 1.7 -9 687.40 -66.9 -63.4 -66.9 59 -99 SPO 1997 04 04 11 55 113 0.9 -9 687.40 -67.0 -63.7 -66.9 60 -99 SPO 1997 04 04 11 56 153 0.6 -9 687.50 -67.2 -64.4 -67.1 60 -99 SPO 1997 04 04 11 57 155 0.6 -9 687.50 -67.3 -64.7 -67.2 59 -99 SPO 1997 04 04 11 58 118 1.0 -9 687.50 -67.2 -64.4 -67.1 57 -99 SPO 1997 04 04 11 59 111 1.2 -9 687.50 -67.2 -64.0 -67.1 57 -99 SPO 1997 04 04 12 00 100 1.4 -9 687.50 -67.2 -63.8 -67.1 58 0 SPO 1997 04 04 12 01 96 1.7 -9 687.50 -67.1 -63.5 -67.1 56 -99 SPO 1997 04 04 12 02 105 1.0 -9 687.50 -67.1 -63.4 -67.1 56 -99 SPO 1997 04 04 12 03 138 0.3 -9 687.60 -67.2 -63.8 -67.1 56 -99 SPO 1997 04 04 12 04 102 1.3 -9 687.60 -67.4 -63.9 -67.2 57 -99 SPO 1997 04 04 12 05 94 1.9 -9 687.50 -67.3 -63.6 -67.2 56 -99 SPO 1997 04 04 12 06 87 1.9 -9 687.40 -67.3 -63.2 -67.2 56 -99 SPO 1997 04 04 12 07 79 1.6 -9 687.40 -67.3 -63.2 -67.2 56 -99 SPO 1997 04 04 12 08 73 1.8 -9 687.40 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 09 75 2.3 -9 687.40 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 10 77 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 11 84 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 12 87 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 13 84 1.8 -9 687.50 -67.3 -63.3 -67.3 56 -99 SPO 1997 04 04 12 14 85 1.7 -9 687.50 -67.3 -63.5 -67.3 57 -99 SPO 1997 04 04 12 15 94 1.6 -9 687.50 -67.3 -63.6 -67.3 57 -99 SPO 1997 04 04 12 16 97 1.8 -9 687.40 -67.2 -63.6 -67.3 56 -99 SPO 1997 04 04 12 17 98 2.1 -9 687.40 -67.2 -63.5 -67.3 57 -99 SPO 1997 04 04 12 18 108 1.8 -9 687.50 -67.1 -63.6 -67.2 57 -99 SPO 1997 04 04 12 19 129 1.5 -9 687.60 -67.1 -64.0 -67.2 58 -99 SPO 1997 04 04 12 20 129 1.5 -9 687.60 -67.0 -64.1 -67.2 58 -99 SPO 1997 04 04 12 21 114 1.6 -9 687.60 -66.9 -64.0 -67.1 58 -99 SPO 1997 04 04 12 22 119 1.5 -9 687.60 -66.8 -63.8 -67.1 58 -99 SPO 1997 04 04 12 23 140 1.1 -9 687.60 -66.8 -63.9 -67.0 58 -99 SPO 1997 04 04 12 24 133 0.7 -9 687.70 -67.0 -64.3 -67.3 60 -99 SPO 1997 04 04 12 25 113 1.1 -9 687.70 -67.3 -64.2 -67.4 60 -99 SPO 1997 04 04 12 26 109 1.4 -9 687.70 -67.2 -64.0 -67.4 58 -99 SPO 1997 04 04 12 27 111 1.3 -9 687.70 -67.2 -63.9 -67.3 58 -99 SPO 1997 04 04 12 28 110 1.1 -9 687.70 -67.2 -64.0 -67.3 58 -99 SPO 1997 04 04 12 29 94 1.1 -9 687.70 -67.3 -64.1 -67.3 58 -99 SPO 1997 04 04 12 30 101 1.2 -9 687.70 -67.1 -64.1 -67.2 56 -99 SPO 1997 04 04 12 31 104 1.4 -9 687.70 -66.8 -64.2 -67.1 55 -99 SPO 1997 04 04 12 32 96 1.7 -9 687.70 -66.8 -64.2 -67.0 56 -99 SPO 1997 04 04 12 33 96 1.9 -9 687.70 -66.5 -64.0 -66.8 56 -99 SPO 1997 04 04 12 34 97 1.8 -9 687.70 -66.5 -63.8 -66.8 58 -99 SPO 1997 04 04 12 35 91 1.7 -9 687.70 -66.6 -63.8 -66.9 58 -99 SPO 1997 04 04 12 36 84 2.0 -9 687.60 -66.8 -63.8 -67.0 59 -99 SPO 1997 04 04 12 37 79 2.5 -9 687.60 -67.0 -63.6 -67.1 60 -99 SPO 1997 04 04 12 38 73 2.7 -9 687.60 -67.0 -63.6 -67.1 59 -99 SPO 1997 04 04 12 39 70 2.8 -9 687.60 -67.0 -63.5 -67.1 58 -99 SPO 1997 04 04 12 40 71 2.9 -9 687.60 -67.1 -63.5 -67.1 59 -99 SPO 1997 04 04 12 41 70 2.8 -9 687.60 -67.2 -63.5 -67.2 58 -99 SPO 1997 04 04 12 42 68 2.7 -9 687.60 -67.2 -63.6 -67.2 57 -99 SPO 1997 04 04 12 43 67 2.8 -9 687.60 -67.4 -63.6 -67.3 58 -99 SPO 1997 04 04 12 44 68 3.0 -9 687.60 -67.4 -63.5 -67.3 57 -99 SPO 1997 04 04 12 45 71 3.3 -9 687.60 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 46 73 3.1 -9 687.60 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 47 73 2.8 -9 687.60 -67.3 -63.5 -67.2 56 -99 SPO 1997 04 04 12 48 77 2.7 -9 687.60 -67.4 -63.6 -67.3 56 -99 SPO 1997 04 04 12 49 79 2.8 -9 687.60 -67.4 -63.6 -67.4 56 -99 SPO 1997 04 04 12 50 79 2.5 -9 687.70 -67.5 -63.6 -67.4 57 -99 SPO 1997 04 04 12 51 78 2.5 -9 687.70 -67.4 -63.7 -67.4 56 -99 SPO 1997 04 04 12 52 74 2.6 -9 687.80 -67.4 -63.5 -67.4 56 -99 SPO 1997 04 04 12 53 77 2.7 -9 687.80 -67.3 -63.3 -67.4 56 -99 SPO 1997 04 04 12 54 82 2.9 -9 687.80 -67.2 -63.2 -67.4 56 -99 SPO 1997 04 04 12 55 84 3.0 -9 687.80 -67.2 -63.0 -67.3 58 -99 SPO 1997 04 04 12 56 84 3.0 -9 687.80 -67.2 -63.0 -67.3 58 -99 SPO 1997 04 04 12 57 84 3.1 -9 687.80 -67.2 -62.9 -67.3 58 -99 SPO 1997 04 04 12 58 84 2.9 -9 687.90 -67.2 -62.8 -67.3 58 -99 SPO 1997 04 04 12 59 85 3.0 -9 687.90 -67.2 -62.8 -67.3 57 -99 SPO 1997 04 04 13 00 85 3.0 -9 687.90 -67.2 -62.8 -67.3 56 0 SPO 1997 04 04 13 01 84 3.3 -9 687.90 -67.2 -62.8 -67.3 56 -99 SPO 1997 04 04 13 02 79 3.4 -9 687.90 -67.2 -62.8 -67.3 57 -99 SPO 1997 04 04 13 03 78 3.3 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 04 79 3.4 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 05 76 3.6 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 06 76 3.8 -9 687.90 -67.1 -62.8 -67.2 57 -99 SPO 1997 04 04 13 07 76 3.8 -9 687.90 -67.1 -62.8 -67.2 57 -99 SPO 1997 04 04 13 08 76 3.8 -9 687.90 -67.2 -62.8 -67.3 58 -99 SPO 1997 04 04 13 09 79 3.7 -9 687.90 -67.3 -62.7 -67.4 57 -99 SPO 1997 04 04 13 10 82 3.3 -9 688.00 -67.3 -62.6 -67.4 57 -99 SPO 1997 04 04 13 11 84 3.0 -9 688.00 -67.3 -62.6 -67.4 58 -99 SPO 1997 04 04 13 12 84 3.1 -9 688.10 -67.2 -62.7 -67.3 57 -99 SPO 1997 04 04 13 13 85 2.8 -9 688.10 -67.2 -62.8 -67.2 57 -99 SPO 1997 04 04 13 14 87 2.7 -9 688.10 -67.1 -62.9 -67.2 56 -99 SPO 1997 04 04 13 15 87 2.7 -9 688.10 -67.0 -62.9 -67.2 56 -99 SPO 1997 04 04 13 16 83 3.0 -9 688.10 -67.0 -62.9 -67.1 57 -99 SPO 1997 04 04 13 17 81 3.1 -9 688.10 -66.9 -62.9 -67.1 57 -99 SPO 1997 04 04 13 18 80 3.1 -9 688.10 -66.9 -62.8 -67.0 58 -99 SPO 1997 04 04 13 19 80 3.3 -9 688.10 -66.9 -62.8 -67.0 59 -99 SPO 1997 04 04 13 20 80 3.2 -9 688.10 -66.8 -62.7 -66.9 59 -99 SPO 1997 04 04 13 21 80 3.1 -9 688.10 -66.8 -62.7 -66.9 59 -99 SPO 1997 04 04 13 22 83 3.1 -9 688.10 -66.9 -62.7 -67.0 60 -99 SPO 1997 04 04 13 23 81 3.0 -9 688.10 -67.0 -62.7 -67.1 60 -99 SPO 1997 04 04 13 24 81 3.1 -9 688.10 -67.1 -62.7 -67.1 59 -99 SPO 1997 04 04 13 25 83 2.9 -9 688.20 -67.2 -62.7 -67.2 59 -99 SPO 1997 04 04 13 26 86 2.9 -9 688.20 -67.2 -62.7 -67.2 58 -99 SPO 1997 04 04 13 27 86 3.1 -9 688.20 -67.3 -62.6 -67.2 58 -99 SPO 1997 04 04 13 28 83 3.2 -9 688.20 -67.3 -62.6 -67.2 57 -99 SPO 1997 04 04 13 29 82 3.2 -9 688.20 -67.3 -62.6 -67.2 56 -99 SPO 1997 04 04 13 30 80 3.2 -9 688.20 -67.3 -62.7 -67.2 56 -99 SPO 1997 04 04 13 31 80 3.1 -9 688.20 -67.3 -62.8 -67.3 56 -99 SPO 1997 04 04 13 32 80 3.1 -9 688.20 -67.4 -62.8 -67.3 58 -99 SPO 1997 04 04 13 33 80 3.1 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 34 78 3.2 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 35 80 3.3 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 36 80 3.3 -9 688.20 -67.4 -62.8 -67.3 57 -99 SPO 1997 04 04 13 37 80 3.6 -9 688.20 -67.3 -62.6 -67.3 57 -99 SPO 1997 04 04 13 38 79 3.6 -9 688.20 -67.3 -62.4 -67.2 57 -99 SPO 1997 04 04 13 39 79 3.7 -9 688.20 -67.2 -62.3 -67.2 56 -99 SPO 1997 04 04 13 40 79 3.7 -9 688.20 -67.2 -62.0 -67.1 58 -99 SPO 1997 04 04 13 41 78 3.8 -9 688.20 -67.2 -62.1 -67.1 58 -99 SPO 1997 04 04 13 42 78 3.8 -9 688.20 -67.1 -62.0 -67.0 58 -99 SPO 1997 04 04 13 43 77 3.8 -9 688.20 -67.0 -62.1 -66.9 58 -99 SPO 1997 04 04 13 44 76 3.6 -9 688.20 -66.9 -62.2 -66.9 58 -99 SPO 1997 04 04 13 45 76 3.6 -9 688.20 -67.0 -62.4 -67.0 59 -99 SPO 1997 04 04 13 46 74 3.7 -9 688.20 -67.0 -62.4 -67.1 59 -99 SPO 1997 04 04 13 47 72 3.9 -9 688.20 -67.0 -62.1 -67.0 59 -99 SPO 1997 04 04 13 48 73 3.9 -9 688.20 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 13 49 71 3.8 -9 688.20 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 50 70 3.9 -9 688.20 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 13 51 70 4.0 -9 688.20 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 52 71 4.2 -9 688.10 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 53 71 4.3 -9 688.10 -66.9 -61.7 -67.0 59 -99 SPO 1997 04 04 13 54 70 4.5 -9 688.10 -66.9 -61.5 -67.0 60 -99 SPO 1997 04 04 13 55 69 4.5 -9 688.10 -66.9 -61.2 -67.0 60 -99 SPO 1997 04 04 13 56 69 4.7 -9 688.10 -66.9 -61.0 -66.9 60 -99 SPO 1997 04 04 13 57 68 4.8 -9 688.10 -66.9 -60.6 -66.9 59 -99 SPO 1997 04 04 13 58 66 4.9 -9 688.10 -66.8 -60.4 -66.9 59 -99 SPO 1997 04 04 13 59 64 5.0 -9 688.10 -66.8 -60.2 -66.9 60 -99 SPO 1997 04 04 14 00 63 4.9 -9 688.10 -66.8 -60.0 -66.9 60 0 SPO 1997 04 04 14 01 63 4.8 -9 688.10 -66.8 -59.7 -66.9 60 -99 SPO 1997 04 04 14 02 64 4.9 -9 688.10 -66.8 -60.0 -66.9 60 -99 SPO 1997 04 04 14 03 64 4.9 -9 688.10 -66.8 -60.2 -66.9 60 -99 SPO 1997 04 04 14 04 64 4.8 -9 688.10 -66.8 -60.1 -66.8 61 -99 SPO 1997 04 04 14 05 63 4.7 -9 688.10 -66.7 -60.0 -66.8 60 -99 SPO 1997 04 04 14 06 63 4.8 -9 688.10 -66.7 -59.9 -66.8 60 -99 SPO 1997 04 04 14 07 63 4.8 -9 688.10 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 08 63 4.8 -9 688.10 -66.7 -59.7 -66.8 60 -99 SPO 1997 04 04 14 09 64 4.8 -9 688.20 -66.7 -59.7 -66.8 60 -99 SPO 1997 04 04 14 10 64 4.7 -9 688.20 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 11 64 4.8 -9 688.20 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 12 64 4.9 -9 688.10 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 13 63 5.0 -9 688.10 -66.7 -59.6 -66.8 60 -99 SPO 1997 04 04 14 14 63 5.0 -9 688.10 -66.7 -59.5 -66.8 60 -99 SPO 1997 04 04 14 15 63 5.2 -9 688.10 -66.7 -59.4 -66.8 60 -99 SPO 1997 04 04 14 16 61 5.2 -9 688.10 -66.7 -59.5 -66.7 61 -99 SPO 1997 04 04 14 17 61 5.1 -9 688.20 -66.7 -59.7 -66.7 61 -99 SPO 1997 04 04 14 18 62 5.1 -9 688.20 -66.6 -59.6 -66.7 60 -99 SPO 1997 04 04 14 19 62 5.1 -9 688.20 -66.6 -59.6 -66.7 60 -99 SPO 1997 04 04 14 20 62 5.2 -9 688.20 -66.6 -59.5 -66.7 61 -99 SPO 1997 04 04 14 21 62 5.3 -9 688.10 -66.6 -59.4 -66.7 61 -99 SPO 1997 04 04 14 22 62 5.4 -9 688.10 -66.5 -59.2 -66.7 60 -99 SPO 1997 04 04 14 23 62 5.5 -9 688.10 -66.6 -59.1 -66.6 61 -99 SPO 1997 04 04 14 24 62 5.5 -9 688.10 -66.5 -59.1 -66.6 60 -99 SPO 1997 04 04 14 25 61 5.5 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 26 61 5.4 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 27 62 5.4 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 28 63 5.3 -9 688.10 -66.4 -59.4 -66.5 60 -99 SPO 1997 04 04 14 29 64 5.2 -9 688.10 -66.4 -59.6 -66.5 61 -99 SPO 1997 04 04 14 30 63 5.1 -9 688.10 -66.4 -59.8 -66.5 61 -99 SPO 1997 04 04 14 31 63 4.8 -9 688.20 -66.4 -60.0 -66.4 61 -99 SPO 1997 04 04 14 32 64 4.7 -9 688.20 -66.3 -60.2 -66.4 61 -99 SPO 1997 04 04 14 33 63 4.6 -9 688.20 -66.3 -60.3 -66.4 61 -99 SPO 1997 04 04 14 34 63 4.6 -9 688.20 -66.2 -60.4 -66.4 61 -99 SPO 1997 04 04 14 35 63 4.6 -9 688.20 -66.2 -60.5 -66.4 61 -99 SPO 1997 04 04 14 36 63 4.8 -9 688.20 -66.2 -60.6 -66.4 61 -99 SPO 1997 04 04 14 37 62 4.9 -9 688.20 -66.2 -60.5 -66.3 61 -99 SPO 1997 04 04 14 38 63 5.0 -9 688.20 -66.2 -60.5 -66.3 61 -99 SPO 1997 04 04 14 39 64 4.9 -9 688.20 -66.2 -60.5 -66.3 60 -99 SPO 1997 04 04 14 40 64 4.8 -9 688.20 -66.2 -60.6 -66.3 60 -99 SPO 1997 04 04 14 41 64 4.9 -9 688.20 -66.2 -60.8 -66.3 60 -99 SPO 1997 04 04 14 42 64 5.1 -9 688.20 -66.2 -60.7 -66.3 60 -99 SPO 1997 04 04 14 43 64 5.1 -9 688.20 -66.2 -60.5 -66.3 60 -99 SPO 1997 04 04 14 44 64 4.8 -9 688.20 -66.3 -60.7 -66.3 61 -99 SPO 1997 04 04 14 45 64 5.0 -9 688.30 -66.3 -60.7 -66.3 61 -99 SPO 1997 04 04 14 46 64 5.0 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 47 63 4.8 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 48 63 4.8 -9 688.30 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 14 49 64 4.9 -9 688.30 -66.2 -60.8 -66.3 61 -99 SPO 1997 04 04 14 50 65 4.9 -9 688.30 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 14 51 66 4.8 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 52 66 4.9 -9 688.30 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 53 66 4.8 -9 688.30 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 54 66 4.8 -9 688.30 -66.2 -60.3 -66.3 61 -99 SPO 1997 04 04 14 55 66 4.6 -9 688.30 -66.2 -60.3 -66.3 61 -99 SPO 1997 04 04 14 56 66 4.5 -9 688.40 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 57 67 4.6 -9 688.40 -66.2 -60.6 -66.3 60 -99 SPO 1997 04 04 14 58 67 4.8 -9 688.30 -66.2 -60.7 -66.3 60 -99 SPO 1997 04 04 14 59 66 4.8 -9 688.30 -66.3 -60.5 -66.4 61 -99 SPO 1997 04 04 15 00 67 4.8 -9 688.30 -66.3 -60.7 -66.4 61 0 SPO 1997 04 04 15 01 68 4.8 -9 688.40 -66.3 -60.7 -66.4 60 -99 SPO 1997 04 04 15 02 69 4.7 -9 688.40 -66.3 -60.7 -66.4 60 -99 SPO 1997 04 04 15 03 72 4.6 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 04 72 4.6 -9 688.40 -66.3 -60.7 -66.4 61 -99 SPO 1997 04 04 15 05 72 4.6 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 06 72 4.8 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 07 72 4.8 -9 688.40 -66.3 -60.8 -66.4 60 -99 SPO 1997 04 04 15 08 72 4.7 -9 688.40 -66.3 -60.9 -66.4 60 -99 SPO 1997 04 04 15 09 73 4.5 -9 688.50 -66.3 -60.9 -66.4 60 -99 SPO 1997 04 04 15 10 75 4.1 -9 688.60 -66.3 -61.0 -66.4 60 -99 SPO 1997 04 04 15 11 78 3.7 -9 688.60 -66.3 -61.3 -66.4 60 -99 SPO 1997 04 04 15 12 82 3.3 -9 688.70 -66.4 -61.8 -66.4 60 -99 SPO 1997 04 04 15 13 87 3.0 -9 688.80 -66.4 -62.1 -66.4 60 -99 SPO 1997 04 04 15 14 91 3.0 -9 688.80 -66.4 -62.4 -66.5 60 -99 SPO 1997 04 04 15 15 91 3.0 -9 688.70 -66.5 -62.5 -66.6 60 -99 SPO 1997 04 04 15 16 85 3.3 -9 688.70 -66.5 -62.5 -66.6 60 -99 SPO 1997 04 04 15 17 81 3.5 -9 688.60 -66.6 -62.5 -66.7 60 -99 SPO 1997 04 04 15 18 79 3.8 -9 688.60 -66.7 -62.4 -66.8 60 -99 SPO 1997 04 04 15 19 77 4.0 -9 688.60 -66.8 -62.2 -66.8 60 -99 SPO 1997 04 04 15 20 76 4.0 -9 688.60 -67.0 -61.8 -67.0 61 -99 SPO 1997 04 04 15 21 75 4.0 -9 688.60 -67.1 -61.6 -67.0 60 -99 SPO 1997 04 04 15 22 76 4.1 -9 688.60 -67.2 -61.5 -67.1 60 -99 SPO 1997 04 04 15 23 77 4.1 -9 688.60 -67.2 -61.5 -67.1 59 -99 SPO 1997 04 04 15 24 76 4.2 -9 688.60 -67.3 -61.5 -67.2 59 -99 SPO 1997 04 04 15 25 75 4.2 -9 688.60 -67.3 -61.2 -67.2 58 -99 SPO 1997 04 04 15 26 73 4.1 -9 688.60 -67.3 -61.0 -67.2 57 -99 SPO 1997 04 04 15 27 73 4.0 -9 688.60 -67.3 -61.2 -67.1 57 -99 SPO 1997 04 04 15 28 73 4.1 -9 688.60 -67.3 -61.2 -67.1 57 -99 SPO 1997 04 04 15 29 70 4.4 -9 688.50 -67.3 -61.2 -67.2 57 -99 SPO 1997 04 04 15 30 69 4.6 -9 688.50 -67.2 -61.0 -67.2 57 -99 SPO 1997 04 04 15 31 70 4.7 -9 688.50 -67.2 -60.8 -67.2 57 -99 SPO 1997 04 04 15 32 68 5.0 -9 688.40 -67.2 -60.2 -67.2 56 -99 SPO 1997 04 04 15 33 66 4.9 -9 688.40 -67.2 -59.9 -67.1 57 -99 SPO 1997 04 04 15 34 66 4.6 -9 688.50 -67.2 -60.0 -67.0 57 -99 SPO 1997 04 04 15 35 68 4.5 -9 688.50 -67.1 -59.9 -67.0 56 -99 SPO 1997 04 04 15 36 68 4.3 -9 688.50 -67.0 -60.2 -67.0 56 -99 SPO 1997 04 04 15 37 68 4.5 -9 688.50 -67.0 -60.3 -66.9 56 -99 SPO 1997 04 04 15 38 68 4.5 -9 688.50 -66.9 -60.4 -66.9 56 -99 SPO 1997 04 04 15 39 68 4.3 -9 688.60 -66.9 -60.6 -66.9 56 -99 SPO 1997 04 04 15 40 69 4.1 -9 688.60 -66.9 -60.7 -66.9 56 -99 SPO 1997 04 04 15 41 69 4.1 -9 688.60 -66.8 -61.0 -66.8 56 -99 SPO 1997 04 04 15 42 66 4.5 -9 688.60 -66.8 -61.0 -66.8 56 -99 SPO 1997 04 04 15 43 64 4.7 -9 688.50 -66.7 -60.8 -66.7 57 -99 SPO 1997 04 04 15 44 62 4.7 -9 688.50 -66.7 -60.8 -66.7 57 -99 SPO 1997 04 04 15 45 62 4.7 -9 688.50 -66.7 -60.6 -66.8 58 -99 SPO 1997 04 04 15 46 62 4.5 -9 688.50 -66.7 -60.4 -66.8 58 -99 SPO 1997 04 04 15 47 62 4.5 -9 688.60 -66.7 -60.2 -66.8 58 -99 SPO 1997 04 04 15 48 62 4.3 -9 688.60 -66.6 -60.0 -66.7 58 -99 SPO 1997 04 04 15 49 62 3.9 -9 688.60 -66.6 -60.2 -66.7 58 -99 SPO 1997 04 04 15 50 61 3.7 -9 688.60 -66.5 -60.4 -66.7 57 -99 SPO 1997 04 04 15 51 60 3.9 -9 688.60 -66.5 -60.6 -66.6 57 -99 SPO 1997 04 04 15 52 59 4.2 -9 688.60 -66.5 -60.1 -66.6 57 -99 SPO 1997 04 04 15 53 59 4.4 -9 688.60 -66.4 -59.8 -66.5 58 -99 SPO 1997 04 04 15 54 60 4.3 -9 688.60 -66.4 -59.7 -66.5 59 -99 SPO 1997 04 04 15 55 61 4.1 -9 688.60 -66.4 -59.8 -66.5 59 -99 SPO 1997 04 04 15 56 61 3.8 -9 688.60 -66.4 -60.3 -66.5 60 -99 SPO 1997 04 04 15 57 62 3.6 -9 688.70 -66.4 -61.0 -66.5 60 -99 SPO 1997 04 04 15 58 62 3.5 -9 688.70 -66.4 -61.2 -66.6 60 -99 SPO 1997 04 04 15 59 62 3.5 -9 688.70 -66.4 -61.4 -66.6 60 -99 SPO 1997 04 04 16 00 61 3.7 -9 688.70 -66.5 -61.5 -66.6 60 0 SPO 1997 04 04 16 01 61 3.9 -9 688.60 -66.5 -61.4 -66.6 60 -99 SPO 1997 04 04 16 02 61 3.9 -9 688.60 -66.5 -61.2 -66.6 59 -99 SPO 1997 04 04 16 03 61 4.2 -9 688.60 -66.6 -61.1 -66.7 60 -99 SPO 1997 04 04 16 04 59 4.8 -9 688.50 -66.6 -60.6 -66.7 60 -99 SPO 1997 04 04 16 05 59 5.0 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 06 60 5.0 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 07 60 4.8 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 08 60 4.7 -9 688.50 -66.7 -60.2 -66.8 59 -99 SPO 1997 04 04 16 09 60 4.7 -9 688.60 -66.7 -60.4 -66.7 59 -99 SPO 1997 04 04 16 10 59 4.7 -9 688.60 -66.7 -60.3 -66.7 60 -99 SPO 1997 04 04 16 11 57 4.8 -9 688.60 -66.7 -60.2 -66.7 60 -99 SPO 1997 04 04 16 12 57 4.8 -9 688.60 -66.6 -60.2 -66.7 60 -99 SPO 1997 04 04 16 13 58 4.8 -9 688.60 -66.6 -60.1 -66.7 60 -99 SPO 1997 04 04 16 14 60 4.7 -9 688.60 -66.6 -60.0 -66.7 60 -99 SPO 1997 04 04 16 15 61 4.9 -9 688.60 -66.6 -59.8 -66.7 60 -99 SPO 1997 04 04 16 16 61 4.7 -9 688.60 -66.6 -59.8 -66.7 60 -99 SPO 1997 04 04 16 17 63 4.4 -9 688.60 -66.6 -60.1 -66.7 60 -99 SPO 1997 04 04 16 18 64 4.1 -9 688.70 -66.7 -60.3 -66.7 60 -99 SPO 1997 04 04 16 19 67 3.8 -9 688.80 -66.7 -60.6 -66.8 60 -99 SPO 1997 04 04 16 20 70 3.5 -9 688.80 -66.7 -61.0 -66.7 60 -99 SPO 1997 04 04 16 21 71 3.4 -9 688.80 -66.7 -61.3 -66.8 60 -99 SPO 1997 04 04 16 22 73 3.1 -9 688.90 -66.7 -61.6 -66.8 60 -99 SPO 1997 04 04 16 23 74 2.9 -9 689.00 -66.8 -61.8 -66.8 60 -99 SPO 1997 04 04 16 24 77 3.0 -9 689.00 -66.8 -61.9 -66.8 60 -99 SPO 1997 04 04 16 25 77 3.0 -9 689.00 -66.8 -62.0 -66.9 60 -99 SPO 1997 04 04 16 26 77 3.3 -9 689.00 -66.8 -62.0 -66.9 60 -99 SPO 1997 04 04 16 27 75 3.5 -9 689.00 -66.9 -61.9 -66.9 60 -99 SPO 1997 04 04 16 28 74 3.3 -9 689.00 -66.9 -61.8 -67.0 60 -99 SPO 1997 04 04 16 29 76 3.2 -9 689.00 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 16 30 79 3.2 -9 689.00 -67.0 -61.7 -67.0 60 -99 SPO 1997 04 04 16 31 80 3.3 -9 689.00 -67.0 -61.8 -67.0 59 -99 SPO 1997 04 04 16 32 81 3.3 -9 689.00 -67.1 -61.8 -67.1 59 -99 SPO 1997 04 04 16 33 84 3.4 -9 689.00 -67.1 -62.0 -67.1 59 -99 SPO 1997 04 04 16 34 85 3.5 -9 689.00 -67.1 -62.1 -67.1 59 -99 SPO 1997 04 04 16 35 83 3.4 -9 689.00 -67.2 -62.2 -67.1 60 -99 SPO 1997 04 04 16 36 81 3.5 -9 689.00 -67.2 -62.1 -67.2 60 -99 SPO 1997 04 04 16 37 81 3.5 -9 689.00 -67.2 -62.1 -67.2 60 -99 SPO 1997 04 04 16 38 83 3.4 -9 689.00 -67.3 -62.2 -67.2 60 -99 SPO 1997 04 04 16 39 86 3.2 -9 689.00 -67.3 -62.2 -67.2 59 -99 SPO 1997 04 04 16 40 87 3.1 -9 689.10 -67.3 -62.2 -67.2 59 -99 SPO 1997 04 04 16 41 85 3.3 -9 689.10 -67.3 -62.4 -67.2 59 -99 SPO 1997 04 04 16 42 88 2.9 -9 689.10 -67.3 -62.4 -67.3 59 -99 SPO 1997 04 04 16 43 88 2.9 -9 689.10 -67.3 -62.4 -67.3 59 -99 SPO 1997 04 04 16 44 89 2.8 -9 689.20 -67.3 -62.5 -67.3 59 -99 SPO 1997 04 04 16 45 86 2.7 -9 689.20 -67.4 -62.5 -67.3 59 -99 SPO 1997 04 04 16 46 88 2.7 -9 689.20 -67.4 -62.4 -67.3 59 -99 SPO 1997 04 04 16 47 90 2.4 -9 689.20 -67.4 -62.4 -67.3 59 -99 SPO 1997 04 04 16 48 89 2.7 -9 689.20 -67.4 -62.3 -67.3 59 -99 SPO 1997 04 04 16 49 85 2.7 -9 689.20 -67.4 -62.1 -67.3 59 -99 SPO 1997 04 04 16 50 81 2.5 -9 689.20 -67.4 -62.0 -67.3 59 -99 SPO 1997 04 04 16 51 81 2.8 -9 689.20 -67.3 -62.0 -67.3 60 -99 SPO 1997 04 04 16 52 81 2.7 -9 689.20 -67.3 -62.0 -67.2 60 -99 SPO 1997 04 04 16 53 80 2.8 -9 689.20 -67.3 -62.0 -67.2 60 -99 SPO 1997 04 04 16 54 79 2.8 -9 689.20 -67.3 -61.9 -67.2 59 -99 SPO 1997 04 04 16 55 79 2.7 -9 689.20 -67.2 -61.8 -67.2 57 -99 SPO 1997 04 04 16 56 80 2.5 -9 689.20 -67.2 -61.8 -67.2 57 -99 SPO 1997 04 04 16 57 80 2.5 -9 689.30 -67.2 -62.0 -67.2 57 -99 SPO 1997 04 04 16 58 78 2.4 -9 689.30 -67.1 -62.1 -67.2 56 -99 SPO 1997 04 04 16 59 73 2.5 -9 689.20 -67.1 -62.2 -67.2 57 -99 SPO 1997 04 04 17 00 70 2.6 -9 689.20 -67.1 -61.9 -67.1 57 0 SPO 1997 04 04 17 01 69 2.8 -9 689.20 -67.1 -61.8 -67.1 59 -99 SPO 1997 04 04 17 02 65 2.9 -9 689.20 -67.0 -61.6 -67.1 58 -99 SPO 1997 04 04 17 03 63 3.0 -9 689.10 -67.0 -61.5 -67.1 58 -99 SPO 1997 04 04 17 04 60 3.1 -9 689.10 -67.0 -61.5 -67.1 58 -99 SPO 1997 04 04 17 05 59 3.1 -9 689.10 -67.0 -61.5 -67.1 59 -99 SPO 1997 04 04 17 06 59 3.2 -9 689.00 -67.0 -61.4 -67.1 59 -99 SPO 1997 04 04 17 07 58 3.3 -9 689.00 -67.0 -61.5 -67.1 59 -99 SPO 1997 04 04 17 08 59 3.5 -9 689.00 -67.0 -61.3 -67.1 60 -99 SPO 1997 04 04 17 09 60 3.7 -9 689.00 -67.0 -61.0 -67.1 60 -99 SPO 1997 04 04 17 10 60 3.9 -9 689.00 -67.0 -60.6 -67.0 60 -99 SPO 1997 04 04 17 11 60 4.2 -9 689.00 -66.9 -60.3 -67.0 60 -99 SPO 1997 04 04 17 12 59 4.2 -9 689.00 -66.9 -60.0 -66.9 60 -99 SPO 1997 04 04 17 13 59 4.2 -9 689.00 -66.8 -59.8 -66.9 60 -99 SPO 1997 04 04 17 14 59 3.9 -9 689.00 -66.8 -59.8 -66.8 60 -99 SPO 1997 04 04 17 15 58 3.9 -9 689.00 -66.7 -59.8 -66.7 60 -99 SPO 1997 04 04 17 16 58 3.9 -9 689.00 -66.6 -59.7 -66.7 60 -99 SPO 1997 04 04 17 17 58 3.9 -9 689.10 -66.5 -59.5 -66.6 60 -99 SPO 1997 04 04 17 18 57 3.8 -9 689.10 -66.4 -59.1 -66.5 60 -99 SPO 1997 04 04 17 19 55 3.7 -9 689.20 -66.4 -59.0 -66.5 61 -99 SPO 1997 04 04 17 20 54 3.6 -9 689.20 -66.3 -58.8 -66.4 61 -99 SPO 1997 04 04 17 21 52 3.6 -9 689.20 -66.3 -58.5 -66.4 61 -99 SPO 1997 04 04 17 22 51 3.6 -9 689.20 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 23 51 3.5 -9 689.30 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 24 51 3.5 -9 689.30 -66.2 -58.7 -66.4 61 -99 SPO 1997 04 04 17 25 53 3.6 -9 689.30 -66.2 -58.8 -66.4 61 -99 SPO 1997 04 04 17 26 53 3.5 -9 689.30 -66.2 -58.7 -66.4 62 -99 SPO 1997 04 04 17 27 54 3.5 -9 689.40 -66.2 -58.6 -66.4 62 -99 SPO 1997 04 04 17 28 53 3.5 -9 689.30 -66.2 -58.9 -66.4 61 -99 SPO 1997 04 04 17 29 55 3.7 -9 689.30 -66.2 -58.8 -66.4 62 -99 SPO 1997 04 04 17 30 57 3.6 -9 689.40 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 31 58 3.4 -9 689.40 -66.2 -58.9 -66.4 61 -99 SPO 1997 04 04 17 32 60 3.2 -9 689.40 -66.2 -59.4 -66.4 62 -99 SPO 1997 04 04 17 33 62 3.2 -9 689.40 -66.2 -60.0 -66.4 63 -99 SPO 1997 04 04 17 34 64 3.5 -9 689.40 -66.2 -60.3 -66.4 63 -99 SPO 1997 04 04 17 35 66 3.7 -9 689.40 -66.2 -60.1 -66.4 62 -99 SPO 1997 04 04 17 36 65 3.3 -9 689.40 -66.3 -60.3 -66.4 62 -99 SPO 1997 04 04 17 37 67 3.4 -9 689.40 -66.3 -60.5 -66.4 62 -99 SPO 1997 04 04 17 38 69 3.3 -9 689.40 -66.3 -60.5 -66.4 61 -99 SPO 1997 04 04 17 39 70 3.2 -9 689.40 -66.3 -60.7 -66.4 61 -99 SPO 1997 04 04 17 40 71 3.1 -9 689.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 17 41 72 3.0 -9 689.50 -66.3 -61.1 -66.4 61 -99 SPO 1997 04 04 17 42 73 2.5 -9 689.60 -66.3 -61.2 -66.4 61 -99 SPO 1997 04 04 17 43 72 2.7 -9 689.60 -66.3 -61.3 -66.4 61 -99 SPO 1997 04 04 17 44 69 2.4 -9 689.70 -66.2 -61.2 -66.3 61 -99 SPO 1997 04 04 17 45 72 2.8 -9 689.70 -66.2 -61.3 -66.3 61 -99 SPO 1997 04 04 17 46 71 3.1 -9 689.70 -66.2 -60.9 -66.3 61 -99 SPO 1997 04 04 17 47 71 3.1 -9 689.60 -66.2 -61.1 -66.3 61 -99 SPO 1997 04 04 17 48 71 3.2 -9 689.60 -66.2 -61.5 -66.3 61 -99 SPO 1997 04 04 17 49 69 3.5 -9 689.50 -66.2 -61.5 -66.2 61 -99 SPO 1997 04 04 17 50 68 3.8 -9 689.50 -66.2 -61.5 -66.2 61 -99 SPO 1997 04 04 17 51 67 4.0 -9 689.40 -66.2 -61.2 -66.3 61 -99 SPO 1997 04 04 17 52 65 4.3 -9 689.40 -66.2 -61.0 -66.3 61 -99 SPO 1997 04 04 17 53 63 4.3 -9 689.40 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 17 54 63 4.3 -9 689.40 -66.2 -60.8 -66.3 61 -99 SPO 1997 04 04 17 55 64 4.2 -9 689.40 -66.2 -60.9 -66.3 61 -99 SPO 1997 04 04 17 56 66 4.0 -9 689.40 -66.2 -61.0 -66.2 61 -99 SPO 1997 04 04 17 57 66 4.0 -9 689.50 -66.1 -60.9 -66.2 61 -99 SPO 1997 04 04 17 58 67 4.0 -9 689.50 -66.1 -60.9 -66.2 61 -99 SPO 1997 04 04 17 59 66 4.2 -9 689.40 -66.1 -60.2 -66.1 61 -99 SPO 1997 04 04 18 00 65 4.3 -9 689.40 -66.0 -60.3 -66.1 61 0 SPO 1997 04 04 18 01 64 4.4 -9 689.40 -66.0 -60.4 -66.1 60 -99 SPO 1997 04 04 18 02 64 4.2 -9 689.40 -66.0 -60.5 -66.1 61 -99 SPO 1997 04 04 18 03 63 3.8 -9 689.40 -66.0 -60.8 -66.1 61 -99 SPO 1997 04 04 18 04 62 3.7 -9 689.50 -66.0 -60.8 -66.1 61 -99 SPO 1997 04 04 18 05 61 3.8 -9 689.50 -66.0 -60.7 -66.1 62 -99 SPO 1997 04 04 18 06 59 3.9 -9 689.50 -66.0 -60.6 -66.0 62 -99 SPO 1997 04 04 18 07 57 3.9 -9 689.50 -65.9 -60.3 -66.0 61 -99 SPO 1997 04 04 18 08 56 3.7 -9 689.50 -65.8 -60.4 -65.9 61 -99 SPO 1997 04 04 18 09 56 3.6 -9 689.60 -65.8 -60.2 -65.9 61 -99 SPO 1997 04 04 18 10 54 3.7 -9 689.60 -65.8 -60.0 -65.9 61 -99 SPO 1997 04 04 18 11 53 4.0 -9 689.60 -65.8 -59.6 -65.9 61 -99 SPO 1997 04 04 18 12 52 4.5 -9 689.50 -65.8 -59.5 -65.9 61 -99 SPO 1997 04 04 18 13 52 4.9 -9 689.40 -65.7 -59.3 -65.8 60 -99 SPO 1997 04 04 18 14 51 5.0 -9 689.40 -65.7 -58.8 -65.8 61 -99 SPO 1997 04 04 18 15 52 5.1 -9 689.40 -65.7 -58.3 -65.8 61 -99 SPO 1997 04 04 18 16 51 5.1 -9 689.40 -65.7 -58.2 -65.8 62 -99 SPO 1997 04 04 18 17 50 5.2 -9 689.40 -65.7 -58.2 -65.8 63 -99 SPO 1997 04 04 18 18 50 5.2 -9 689.40 -65.6 -58.2 -65.7 62 -99 SPO 1997 04 04 18 19 49 5.2 -9 689.40 -65.6 -58.2 -65.6 63 -99 SPO 1997 04 04 18 20 49 5.2 -9 689.40 -65.5 -58.0 -65.6 63 -99 SPO 1997 04 04 18 21 49 5.1 -9 689.40 -65.5 -57.8 -65.5 63 -99 SPO 1997 04 04 18 22 49 5.1 -9 689.40 -65.4 -57.7 -65.5 62 -99 SPO 1997 04 04 18 23 48 4.8 -9 689.50 -65.4 -57.7 -65.5 62 -99 SPO 1997 04 04 18 24 47 4.5 -9 689.50 -65.4 -57.8 -65.5 62 -99 SPO 1997 04 04 18 25 48 4.7 -9 689.60 -65.3 -58.0 -65.4 61 -99 SPO 1997 04 04 18 26 48 4.7 -9 689.50 -65.3 -57.8 -65.4 62 -99 SPO 1997 04 04 18 27 48 4.8 -9 689.60 -65.3 -57.6 -65.4 62 -99 SPO 1997 04 04 18 28 47 4.6 -9 689.60 -65.3 -57.7 -65.4 62 -99 SPO 1997 04 04 18 29 47 4.7 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 30 47 4.7 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 31 46 4.8 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 32 45 4.8 -9 689.60 -65.2 -57.7 -65.4 63 -99 SPO 1997 04 04 18 33 43 4.8 -9 689.60 -65.2 -57.8 -65.4 63 -99 SPO 1997 04 04 18 34 43 4.7 -9 689.60 -65.2 -57.8 -65.3 62 -99 SPO 1997 04 04 18 35 41 4.7 -9 689.60 -65.2 -57.7 -65.3 62 -99 SPO 1997 04 04 18 36 41 4.5 -9 689.60 -65.2 -57.7 -65.3 62 -99 SPO 1997 04 04 18 37 41 4.5 -9 689.60 -65.2 -57.8 -65.2 62 -99 SPO 1997 04 04 18 38 42 4.3 -9 689.60 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 18 39 44 4.1 -9 689.60 -65.1 -57.8 -65.2 62 -99 SPO 1997 04 04 18 40 44 4.2 -9 689.60 -65.1 -57.8 -65.3 62 -99 SPO 1997 04 04 18 41 45 4.2 -9 689.60 -65.2 -57.6 -65.3 62 -99 SPO 1997 04 04 18 42 45 4.2 -9 689.60 -65.2 -57.6 -65.4 62 -99 SPO 1997 04 04 18 43 44 4.4 -9 689.60 -65.3 -57.5 -65.4 63 -99 SPO 1997 04 04 18 44 42 4.4 -9 689.60 -65.3 -57.5 -65.4 64 -99 SPO 1997 04 04 18 45 43 4.3 -9 689.60 -65.3 -57.6 -65.4 62 -99 SPO 1997 04 04 18 46 43 4.2 -9 689.70 -65.3 -57.8 -65.4 62 -99 SPO 1997 04 04 18 47 43 4.1 -9 689.70 -65.3 -58.0 -65.4 62 -99 SPO 1997 04 04 18 48 43 4.2 -9 689.70 -65.3 -58.0 -65.4 62 -99 SPO 1997 04 04 18 49 44 4.0 -9 689.70 -65.4 -58.0 -65.4 62 -99 SPO 1997 04 04 18 50 42 3.8 -9 689.70 -65.4 -58.1 -65.4 62 -99 SPO 1997 04 04 18 51 42 3.6 -9 689.80 -65.4 -58.3 -65.4 63 -99 SPO 1997 04 04 18 52 43 3.8 -9 689.80 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 53 41 4.0 -9 689.70 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 54 40 4.1 -9 689.70 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 55 41 4.2 -9 689.70 -65.4 -58.0 -65.5 -99 -99 SPO 1997 04 04 18 56 40 4.2 -9 689.70 -65.4 -58.0 -65.5 -99 -99 SPO 1997 04 04 18 57 39 4.3 -9 689.70 -65.5 -57.9 -65.5 62 -99 SPO 1997 04 04 18 58 38 4.3 -9 689.70 -65.4 -57.8 -65.4 62 -99 SPO 1997 04 04 18 59 39 4.3 -9 689.70 -65.4 -57.9 -65.4 61 -99 SPO 1997 04 04 19 00 39 4.4 -9 689.70 -65.3 -57.9 -65.3 61 0 SPO 1997 04 04 19 01 41 4.6 -9 689.70 -65.2 -58.0 -65.2 61 -99 SPO 1997 04 04 19 02 42 4.8 -9 689.60 -65.2 -58.0 -65.2 62 -99 SPO 1997 04 04 19 03 42 4.9 -9 689.60 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 19 04 42 5.0 -9 689.70 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 19 05 43 5.0 -9 689.60 -65.1 -58.0 -65.1 63 -99 SPO 1997 04 04 19 06 43 4.9 -9 689.60 -65.1 -58.0 -65.1 63 -99 SPO 1997 04 04 19 07 43 4.8 -9 689.70 -65.0 -58.1 -65.1 62 -99 SPO 1997 04 04 19 08 43 4.6 -9 689.70 -65.0 -58.0 -65.0 62 -99 SPO 1997 04 04 19 09 43 4.4 -9 689.70 -64.9 -57.9 -64.9 62 -99 SPO 1997 04 04 19 10 43 4.4 -9 689.70 -64.8 -57.9 -64.9 62 -99 SPO 1997 04 04 19 11 42 4.3 -9 689.70 -64.8 -58.0 -64.8 62 -99 SPO 1997 04 04 19 12 41 3.9 -9 689.80 -64.7 -58.2 -64.8 62 -99 SPO 1997 04 04 19 13 40 3.8 -9 689.80 -64.7 -58.3 -64.8 62 -99 SPO 1997 04 04 19 14 40 3.5 -9 689.80 -64.6 -58.6 -64.7 61 -99 SPO 1997 04 04 19 15 40 3.5 -9 689.80 -64.5 -58.8 -64.6 62 -99 SPO 1997 04 04 19 16 39 3.5 -9 689.90 -64.5 -59.0 -64.5 63 -99 SPO 1997 04 04 19 17 38 3.6 -9 689.90 -64.4 -59.0 -64.5 63 -99 SPO 1997 04 04 19 18 38 3.6 -9 689.90 -64.3 -59.0 -64.4 63 -99 SPO 1997 04 04 19 19 38 3.7 -9 689.90 -64.3 -59.2 -64.4 63 -99 SPO 1997 04 04 19 20 39 3.9 -9 689.80 -64.3 -59.2 -64.4 63 -99 SPO 1997 04 04 19 21 38 4.2 -9 689.80 -64.3 -59.0 -64.4 64 -99 SPO 1997 04 04 19 22 38 4.3 -9 689.80 -64.3 -59.0 -64.4 64 -99 SPO 1997 04 04 19 23 38 4.2 -9 689.80 -64.2 -58.8 -64.4 63 -99 SPO 1997 04 04 19 24 37 4.4 -9 689.80 -64.2 -58.8 -64.3 63 -99 SPO 1997 04 04 19 25 37 4.3 -9 689.80 -64.2 -58.8 -64.2 63 -99 SPO 1997 04 04 19 26 36 4.3 -9 689.80 -64.0 -58.8 -64.0 63 -99 SPO 1997 04 04 19 27 36 4.3 -9 689.80 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 28 39 4.3 -9 689.80 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 29 37 4.3 -9 689.80 -63.9 -58.6 -64.0 63 -99 SPO 1997 04 04 19 30 36 4.1 -9 689.80 -63.9 -58.7 -64.1 63 -99 SPO 1997 04 04 19 31 35 4.1 -9 689.90 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 32 35 4.3 -9 689.90 -63.8 -58.6 -63.8 63 -99 SPO 1997 04 04 19 33 35 4.3 -9 689.80 -63.8 -58.3 -63.8 64 -99 SPO 1997 04 04 19 34 36 4.2 -9 689.90 -63.7 -58.3 -63.9 63 -99 SPO 1997 04 04 19 35 35 4.1 -9 689.80 -63.8 -58.4 -63.9 64 -99 SPO 1997 04 04 19 36 35 4.3 -9 689.80 -63.8 -58.5 -63.8 64 -99 SPO 1997 04 04 19 37 34 4.5 -9 689.80 -63.6 -58.3 -63.7 63 -99 SPO 1997 04 04 19 38 35 4.4 -9 689.80 -63.5 -57.8 -63.4 63 -99 SPO 1997 04 04 19 39 34 4.5 -9 689.80 -63.4 -57.5 -63.4 64 -99 SPO 1997 04 04 19 40 33 4.5 -9 689.80 -63.4 -57.4 -63.5 64 -99 SPO 1997 04 04 19 41 31 4.3 -9 689.90 -63.4 -57.5 -63.5 64 -99 SPO 1997 04 04 19 42 30 4.1 -9 690.00 -63.3 -57.7 -63.4 63 -99 SPO 1997 04 04 19 43 28 4.0 -9 690.00 -63.3 -57.9 -63.4 63 -99 SPO 1997 04 04 19 44 30 3.9 -9 690.10 -63.2 -58.1 -63.4 62 -99 SPO 1997 04 04 19 45 31 3.5 -9 690.10 -63.2 -58.2 -63.3 63 -99 SPO 1997 04 04 19 46 31 3.4 -9 690.10 -63.1 -58.4 -63.3 62 -99 SPO 1997 04 04 19 47 32 3.2 -9 690.20 -63.0 -58.5 -63.2 62 -99 SPO 1997 04 04 19 48 32 3.1 -9 690.20 -63.0 -58.6 -63.2 63 -99 SPO 1997 04 04 19 49 30 3.3 -9 690.20 -63.0 -58.8 -63.2 63 -99 SPO 1997 04 04 19 50 33 3.2 -9 690.20 -63.1 -58.8 -63.3 64 -99 SPO 1997 04 04 19 51 38 3.4 -9 690.20 -63.1 -58.9 -63.3 64 -99 SPO 1997 04 04 19 52 38 3.6 -9 690.10 -63.1 -58.8 -63.2 65 -99 SPO 1997 04 04 19 53 37 3.8 -9 690.10 -63.1 -58.7 -63.3 64 -99 SPO 1997 04 04 19 54 36 4.0 -9 690.10 -63.2 -58.6 -63.4 64 -99 SPO 1997 04 04 19 55 36 4.1 -9 690.10 -63.4 -58.5 -63.5 64 -99 SPO 1997 04 04 19 56 36 3.9 -9 690.10 -63.4 -58.4 -63.5 64 -99 SPO 1997 04 04 19 57 37 3.8 -9 690.20 -63.5 -58.4 -63.6 64 -99 SPO 1997 04 04 19 58 38 3.9 -9 690.20 -63.6 -58.4 -63.7 64 -99 SPO 1997 04 04 19 59 40 3.8 -9 690.20 -63.7 -58.5 -63.8 65 -99 SPO 1997 04 04 20 00 39 3.8 -9 690.20 -63.8 -58.5 -63.9 65 0 SPO 1997 04 04 20 01 38 3.7 -9 690.20 -64.0 -58.5 -64.0 65 -99 SPO 1997 04 04 20 02 37 3.8 -9 690.20 -64.1 -58.6 -64.0 66 -99 SPO 1997 04 04 20 03 36 3.7 -9 690.20 -64.2 -58.6 -64.1 65 -99 SPO 1997 04 04 20 04 38 3.6 -9 690.20 -64.2 -58.5 -64.2 64 -99 SPO 1997 04 04 20 05 39 3.6 -9 690.20 -64.3 -58.6 -64.2 63 -99 SPO 1997 04 04 20 06 38 3.7 -9 690.20 -64.3 -58.6 -64.2 63 -99 SPO 1997 04 04 20 07 38 3.8 -9 690.20 -64.4 -58.6 -64.2 63 -99 SPO 1997 04 04 20 08 37 4.0 -9 690.20 -64.4 -58.6 -64.3 62 -99 SPO 1997 04 04 20 09 37 4.1 -9 690.10 -64.6 -58.5 -64.4 63 -99 SPO 1997 04 04 20 10 38 4.2 -9 690.10 -64.7 -58.4 -64.6 63 -99 SPO 1997 04 04 20 11 36 4.2 -9 690.10 -64.7 -58.3 -64.6 62 -99 SPO 1997 04 04 20 12 36 4.4 -9 690.10 -64.8 -58.3 -64.6 63 -99 SPO 1997 04 04 20 13 35 4.5 -9 690.10 -64.7 -58.3 -64.6 62 -99 SPO 1997 04 04 20 14 34 4.5 -9 690.10 -64.7 -58.4 -64.5 62 -99 SPO 1997 04 04 20 15 34 4.5 -9 690.10 -64.6 -58.4 -64.3 62 -99 SPO 1997 04 04 20 16 35 4.3 -9 690.20 -64.3 -58.4 -64.0 59 -99 SPO 1997 04 04 20 17 37 4.1 -9 690.20 -64.1 -58.6 -63.9 59 -99 SPO 1997 04 04 20 18 39 4.2 -9 690.20 -64.0 -58.3 -63.9 60 -99 SPO 1997 04 04 20 19 39 4.1 -9 690.20 -64.0 -58.2 -64.1 61 -99 SPO 1997 04 04 20 20 39 3.9 -9 690.20 -64.2 -58.3 -64.3 62 -99 SPO 1997 04 04 20 21 39 3.9 -9 690.20 -64.3 -58.4 -64.4 62 -99 SPO 1997 04 04 20 22 38 4.1 -9 690.20 -64.4 -58.6 -64.4 63 -99 SPO 1997 04 04 20 23 38 4.0 -9 690.20 -64.4 -58.6 -64.5 62 -99 SPO 1997 04 04 20 24 37 4.0 -9 690.20 -64.4 -58.6 -64.4 62 -99 SPO 1997 04 04 20 25 34 4.0 -9 690.20 -64.4 -58.8 -64.4 63 -99 SPO 1997 04 04 20 26 32 4.1 -9 690.20 -64.4 -59.0 -64.4 63 -99 SPO 1997 04 04 20 27 31 4.1 -9 690.20 -64.3 -59.2 -64.3 62 -99 SPO 1997 04 04 20 28 33 4.1 -9 690.20 -64.2 -59.2 -64.0 61 -99 SPO 1997 04 04 20 29 35 4.2 -9 690.20 -63.9 -59.2 -63.8 60 -99 SPO 1997 04 04 20 30 34 4.3 -9 690.20 -63.7 -59.0 -63.6 60 -99 SPO 1997 04 04 20 31 33 4.3 -9 690.20 -63.7 -58.8 -63.8 61 -99 SPO 1997 04 04 20 32 32 4.3 -9 690.20 -63.7 -58.7 -63.9 60 -99 SPO 1997 04 04 20 33 31 4.3 -9 690.30 -63.8 -58.7 -63.9 61 -99 SPO 1997 04 04 20 34 30 4.3 -9 690.30 -63.7 -58.7 -63.7 61 -99 SPO 1997 04 04 20 35 28 4.5 -9 690.30 -63.5 -58.6 -63.5 61 -99 SPO 1997 04 04 20 36 28 4.7 -9 690.20 -63.4 -58.5 -63.4 62 -99 SPO 1997 04 04 20 37 28 4.8 -9 690.20 -63.2 -58.3 -63.3 61 -99 SPO 1997 04 04 20 38 28 4.8 -9 690.20 -63.1 -58.1 -63.2 61 -99 SPO 1997 04 04 20 39 28 5.0 -9 690.20 -63.0 -58.2 -63.2 62 -99 SPO 1997 04 04 20 40 29 4.6 -9 690.30 -63.0 -58.2 -63.2 62 -99 SPO 1997 04 04 20 41 29 4.4 -9 690.30 -63.1 -58.3 -63.3 63 -99 SPO 1997 04 04 20 42 29 4.4 -9 690.30 -63.1 -58.4 -63.2 62 -99 SPO 1997 04 04 20 43 32 4.0 -9 690.40 -63.0 -58.4 -63.2 61 -99 SPO 1997 04 04 20 44 31 4.0 -9 690.40 -63.0 -58.4 -63.2 62 -99 SPO 1997 04 04 20 45 30 4.0 -9 690.40 -63.1 -58.4 -63.3 63 -99 SPO 1997 04 04 20 46 29 4.1 -9 690.40 -63.1 -58.5 -63.3 63 -99 SPO 1997 04 04 20 47 29 4.2 -9 690.40 -63.1 -58.5 -63.3 64 -99 SPO 1997 04 04 20 48 29 4.3 -9 690.40 -63.1 -58.5 -63.3 64 -99 SPO 1997 04 04 20 49 29 4.3 -9 690.40 -63.1 -58.4 -63.3 64 -99 SPO 1997 04 04 20 50 30 4.4 -9 690.40 -63.1 -58.4 -63.3 63 -99 SPO 1997 04 04 20 51 32 4.4 -9 690.30 -63.1 -58.4 -63.2 63 -99 SPO 1997 04 04 20 52 32 4.4 -9 690.30 -63.1 -58.6 -63.2 62 -99 SPO 1997 04 04 20 53 33 4.3 -9 690.30 -63.1 -58.8 -63.2 62 -99 SPO 1997 04 04 20 54 33 4.0 -9 690.40 -63.1 -58.8 -63.3 62 -99 SPO 1997 04 04 20 55 32 3.8 -9 690.40 -63.2 -58.9 -63.3 64 -99 SPO 1997 04 04 20 56 34 4.1 -9 690.40 -63.2 -58.9 -63.3 64 -99 SPO 1997 04 04 20 57 35 3.9 -9 690.40 -63.2 -59.0 -63.3 64 -99 SPO 1997 04 04 20 58 36 3.8 -9 690.40 -63.2 -59.1 -63.3 64 -99 SPO 1997 04 04 20 59 36 3.7 -9 690.40 -63.2 -59.2 -63.4 64 -99 SPO 1997 04 04 21 00 34 3.6 -9 690.50 -63.3 -59.4 -63.4 64 0 SPO 1997 04 04 21 01 33 3.6 -9 690.50 -63.4 -59.6 -63.5 64 -99 SPO 1997 04 04 21 02 32 3.7 -9 690.50 -63.4 -59.7 -63.5 62 -99 SPO 1997 04 04 21 03 31 3.7 -9 690.40 -63.4 -59.7 -63.4 62 -99 SPO 1997 04 04 21 04 32 3.7 -9 690.50 -63.3 -59.7 -63.3 61 -99 SPO 1997 04 04 21 05 32 3.8 -9 690.40 -63.2 -59.6 -63.2 61 -99 SPO 1997 04 04 21 06 32 4.0 -9 690.40 -63.2 -59.6 -63.2 62 -99 SPO 1997 04 04 21 07 32 4.1 -9 690.40 -63.2 -59.6 -63.2 63 -99 SPO 1997 04 04 21 08 31 4.2 -9 690.40 -63.1 -59.5 -63.2 62 -99 SPO 1997 04 04 21 09 33 4.1 -9 690.40 -63.2 -59.5 -63.2 63 -99 SPO 1997 04 04 21 10 33 4.1 -9 690.40 -63.2 -59.4 -63.3 64 -99 SPO 1997 04 04 21 11 33 4.1 -9 690.40 -63.3 -59.4 -63.4 64 -99 SPO 1997 04 04 21 12 34 4.2 -9 690.40 -63.3 -59.4 -63.4 63 -99 SPO 1997 04 04 21 13 35 4.1 -9 690.40 -63.4 -59.4 -63.5 63 -99 SPO 1997 04 04 21 14 35 4.0 -9 690.40 -63.4 -59.5 -63.5 62 -99 SPO 1997 04 04 21 15 34 3.9 -9 690.40 -63.5 -59.5 -63.6 62 -99 SPO 1997 04 04 21 16 32 3.9 -9 690.40 -63.6 -59.6 -63.6 63 -99 SPO 1997 04 04 21 17 30 3.8 -9 690.40 -63.6 -59.6 -63.6 63 -99 SPO 1997 04 04 21 18 29 4.0 -9 690.50 -63.6 -59.6 -63.6 62 -99 SPO 1997 04 04 21 19 29 3.9 -9 690.50 -63.6 -59.6 -63.6 62 -99 SPO 1997 04 04 21 20 31 3.8 -9 690.50 -63.5 -59.6 -63.4 62 -99 SPO 1997 04 04 21 21 34 3.8 -9 690.40 -63.4 -59.4 -63.3 62 -99 SPO 1997 04 04 21 22 34 3.9 -9 690.40 -63.3 -59.3 -63.2 63 -99 SPO 1997 04 04 21 23 34 4.0 -9 690.40 -63.3 -59.3 -63.4 63 -99 SPO 1997 04 04 21 24 34 4.0 -9 690.40 -63.4 -59.3 -63.5 63 -99 SPO 1997 04 04 21 25 35 4.0 -9 690.40 -63.4 -59.3 -63.6 62 -99 SPO 1997 04 04 21 26 36 4.0 -9 690.40 -63.6 -59.4 -63.7 63 -99 SPO 1997 04 04 21 27 36 4.1 -9 690.40 -63.7 -59.5 -63.7 61 -99 SPO 1997 04 04 21 28 36 4.2 -9 690.40 -63.7 -59.4 -63.8 61 -99 SPO 1997 04 04 21 29 36 4.3 -9 690.40 -63.8 -59.2 -63.8 62 -99 SPO 1997 04 04 21 30 34 4.3 -9 690.40 -63.8 -59.2 -63.8 63 -99 SPO 1997 04 04 21 31 34 4.1 -9 690.40 -63.8 -59.2 -63.8 63 -99 SPO 1997 04 04 21 32 35 4.1 -9 690.40 -63.8 -59.3 -63.8 64 -99 SPO 1997 04 04 21 33 37 4.0 -9 690.40 -63.9 -59.4 -63.9 64 -99 SPO 1997 04 04 21 34 39 3.8 -9 690.40 -63.9 -59.5 -63.9 63 -99 SPO 1997 04 04 21 35 40 3.7 -9 690.40 -64.1 -59.5 -64.0 63 -99 SPO 1997 04 04 21 36 39 3.6 -9 690.40 -64.4 -59.5 -64.2 63 -99 SPO 1997 04 04 21 37 38 3.7 -9 690.40 -64.6 -59.6 -64.4 63 -99 SPO 1997 04 04 21 38 37 3.9 -9 690.40 -64.8 -59.5 -64.6 62 -99 SPO 1997 04 04 21 39 37 4.0 -9 690.40 -64.9 -59.4 -64.6 61 -99 SPO 1997 04 04 21 40 36 4.0 -9 690.40 -64.9 -59.4 -64.6 61 -99 SPO 1997 04 04 21 41 36 4.0 -9 690.40 -64.8 -59.2 -64.6 60 -99 SPO 1997 04 04 21 42 37 4.0 -9 690.40 -64.8 -59.2 -64.6 61 -99 SPO 1997 04 04 21 43 38 3.8 -9 690.40 -64.8 -59.2 -64.6 61 -99 SPO 1997 04 04 21 44 39 3.5 -9 690.40 -64.8 -59.3 -64.6 62 -99 SPO 1997 04 04 21 45 40 3.2 -9 690.50 -64.8 -59.4 -64.6 62 -99 SPO 1997 04 04 21 46 40 3.2 -9 690.50 -65.0 -59.4 -64.8 63 -99 SPO 1997 04 04 21 47 40 3.2 -9 690.60 -65.1 -59.4 -64.8 62 -99 SPO 1997 04 04 21 48 39 3.4 -9 690.50 -65.2 -59.5 -64.9 62 -99 SPO 1997 04 04 21 49 38 3.3 -9 690.50 -65.2 -59.5 -64.9 61 -99 SPO 1997 04 04 21 50 38 3.3 -9 690.50 -65.2 -59.6 -65.0 60 -99 SPO 1997 04 04 21 51 38 3.4 -9 690.50 -65.2 -59.6 -65.0 59 -99 SPO 1997 04 04 21 52 39 3.4 -9 690.50 -65.2 -59.6 -65.0 60 -99 SPO 1997 04 04 21 53 41 3.2 -9 690.50 -65.2 -59.8 -65.0 61 -99 SPO 1997 04 04 21 54 45 2.9 -9 690.50 -65.2 -60.0 -65.0 60 -99 SPO 1997 04 04 21 55 45 2.8 -9 690.50 -65.3 -60.1 -65.1 61 -99 SPO 1997 04 04 21 56 44 2.9 -9 690.50 -65.3 -60.0 -65.1 60 -99 SPO 1997 04 04 21 57 41 3.1 -9 690.50 -65.3 -60.0 -65.1 59 -99 SPO 1997 04 04 21 58 39 3.4 -9 690.50 -65.3 -59.9 -65.2 58 -99 SPO 1997 04 04 21 59 37 3.5 -9 690.50 -65.3 -59.8 -65.2 58 -99 SPO 1997 04 04 22 00 36 3.7 -9 690.50 -65.3 -59.6 -65.1 58 0 SPO 1997 04 04 22 01 35 3.9 -9 690.50 -65.2 -59.5 -65.0 58 -99 SPO 1997 04 04 22 02 35 3.7 -9 690.50 -65.1 -59.5 -65.0 58 -99 SPO 1997 04 04 22 03 36 3.4 -9 690.50 -65.0 -59.8 -65.0 58 -99 SPO 1997 04 04 22 04 38 3.2 -9 690.50 -65.0 -60.0 -65.0 59 -99 SPO 1997 04 04 22 05 39 3.4 -9 690.50 -65.0 -60.0 -65.0 59 -99 SPO 1997 04 04 22 06 38 3.6 -9 690.50 -65.1 -59.9 -65.1 60 -99 SPO 1997 04 04 22 07 37 3.9 -9 690.40 -65.1 -59.9 -65.1 60 -99 SPO 1997 04 04 22 08 36 4.1 -9 690.40 -65.1 -59.7 -65.1 60 -99 SPO 1997 04 04 22 09 36 4.1 -9 690.40 -65.0 -59.5 -65.0 59 -99 SPO 1997 04 04 22 10 36 3.9 -9 690.40 -65.0 -59.4 -64.9 59 -99 SPO 1997 04 04 22 11 36 3.6 -9 690.50 -64.9 -59.4 -64.8 58 -99 SPO 1997 04 04 22 12 36 3.5 -9 690.60 -64.8 -59.3 -64.8 58 -99 SPO 1997 04 04 22 13 35 3.4 -9 690.60 -64.7 -59.2 -64.7 58 -99 SPO 1997 04 04 22 14 33 3.3 -9 690.60 -64.6 -59.4 -64.6 59 -99 SPO 1997 04 04 22 15 32 3.1 -9 690.60 -64.4 -59.7 -64.5 59 -99 SPO 1997 04 04 22 16 32 3.3 -9 690.60 -64.3 -59.7 -64.4 59 -99 SPO 1997 04 04 22 17 32 3.8 -9 690.60 -64.2 -59.6 -64.2 60 -99 SPO 1997 04 04 22 18 32 3.9 -9 690.60 -64.1 -59.4 -64.1 60 -99 SPO 1997 04 04 22 19 33 4.0 -9 690.50 -64.0 -59.4 -64.0 60 -99 SPO 1997 04 04 22 20 34 4.0 -9 690.50 -63.8 -59.3 -64.0 59 -99 SPO 1997 04 04 22 21 37 3.8 -9 690.60 -63.8 -59.4 -63.9 60 -99 SPO 1997 04 04 22 22 39 3.8 -9 690.60 -63.6 -59.5 -63.8 59 -99 SPO 1997 04 04 22 23 39 3.5 -9 690.60 -63.6 -59.6 -63.8 59 -99 SPO 1997 04 04 22 24 40 3.4 -9 690.60 -63.6 -59.7 -63.8 60 -99 SPO 1997 04 04 22 25 39 3.4 -9 690.60 -63.6 -59.8 -63.9 60 -99 SPO 1997 04 04 22 26 39 3.6 -9 690.60 -63.6 -59.7 -63.9 61 -99 SPO 1997 04 04 22 27 35 4.1 -9 690.60 -63.7 -59.4 -64.0 62 -99 SPO 1997 04 04 22 28 33 4.3 -9 690.60 -63.8 -59.0 -64.0 63 -99 SPO 1997 04 04 22 29 33 4.5 -9 690.60 -63.8 -58.7 -64.0 64 -99 SPO 1997 04 04 22 30 33 4.5 -9 690.60 -63.8 -58.6 -63.9 64 -99 SPO 1997 04 04 22 31 33 4.3 -9 690.70 -63.8 -58.8 -63.8 64 -99 SPO 1997 04 04 22 32 35 4.3 -9 690.70 -63.6 -58.7 -63.5 62 -99 SPO 1997 04 04 22 33 35 4.3 -9 690.70 -63.2 -58.7 -63.0 60 -99 SPO 1997 04 04 22 34 36 4.3 -9 690.70 -62.9 -58.6 -62.8 60 -99 SPO 1997 04 04 22 35 36 4.2 -9 690.70 -62.7 -58.6 -62.7 61 -99 SPO 1997 04 04 22 36 35 4.2 -9 690.70 -62.6 -58.5 -62.7 61 -99 SPO 1997 04 04 22 37 36 4.1 -9 690.70 -62.5 -58.5 -62.7 63 -99 SPO 1997 04 04 22 38 36 3.9 -9 690.80 -62.4 -58.6 -62.5 63 -99 SPO 1997 04 04 22 39 35 3.6 -9 690.80 -62.2 -58.7 -62.4 63 -99 SPO 1997 04 04 22 40 34 3.6 -9 690.80 -62.1 -58.8 -62.4 64 -99 SPO 1997 04 04 22 41 36 3.6 -9 690.80 -62.1 -58.8 -62.4 66 -99 SPO 1997 04 04 22 42 36 3.7 -9 690.80 -62.0 -58.9 -62.3 65 -99 SPO 1997 04 04 22 43 35 3.8 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 44 34 3.9 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 45 33 4.0 -9 690.80 -62.1 -58.7 -62.4 65 -99 SPO 1997 04 04 22 46 32 4.1 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 47 34 4.2 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 48 35 4.1 -9 690.80 -62.1 -58.8 -62.3 66 -99 SPO 1997 04 04 22 49 36 4.0 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 50 35 3.9 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 51 33 4.0 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 52 31 4.1 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 53 30 4.3 -9 690.80 -62.0 -58.6 -62.2 65 -99 SPO 1997 04 04 22 54 30 4.5 -9 690.80 -62.0 -58.4 -62.1 64 -99 SPO 1997 04 04 22 55 29 4.6 -9 690.70 -61.8 -58.3 -61.9 63 -99 SPO 1997 04 04 22 56 28 4.8 -9 690.70 -61.7 -58.1 -61.8 63 -99 SPO 1997 04 04 22 57 27 4.8 -9 690.70 -61.6 -57.8 -61.7 63 -99 SPO 1997 04 04 22 58 27 4.6 -9 690.70 -61.5 -57.7 -61.6 62 -99 SPO 1997 04 04 22 59 26 4.4 -9 690.80 -61.4 -57.7 -61.5 63 -99 SPO 1997 04 04 23 00 26 4.2 -9 690.80 -61.3 -57.8 -61.4 64 0 SPO 1997 04 04 23 01 26 4.0 -9 690.80 -61.3 -58.0 -61.4 66 -99 SPO 1997 04 04 23 02 27 4.0 -9 690.80 -61.2 -58.1 -61.4 67 -99 SPO 1997 04 04 23 03 28 4.0 -9 690.80 -61.2 -58.1 -61.3 67 -99 SPO 1997 04 04 23 04 29 3.9 -9 690.90 -61.1 -58.2 -61.3 67 -99 SPO 1997 04 04 23 05 29 3.8 -9 690.90 -61.1 -58.2 -61.2 67 -99 SPO 1997 04 04 23 06 30 3.7 -9 690.90 -61.0 -58.3 -61.2 67 -99 SPO 1997 04 04 23 07 31 3.6 -9 690.90 -61.0 -58.4 -61.1 67 -99 SPO 1997 04 04 23 08 32 3.5 -9 690.90 -60.9 -58.5 -61.1 65 -99 SPO 1997 04 04 23 09 34 3.5 -9 690.90 -60.9 -58.6 -61.1 65 -99 SPO 1997 04 04 23 10 35 3.4 -9 690.90 -60.9 -58.6 -61.2 66 -99 SPO 1997 04 04 23 11 36 3.3 -9 690.90 -61.0 -58.7 -61.1 68 -99 SPO 1997 04 04 23 12 37 3.3 -9 691.00 -61.0 -58.7 -61.2 68 -99 SPO 1997 04 04 23 13 37 3.2 -9 691.00 -61.0 -58.7 -61.3 68 -99 SPO 1997 04 04 23 14 36 3.1 -9 691.00 -61.2 -58.7 -61.4 68 -99 SPO 1997 04 04 23 15 34 3.1 -9 691.10 -61.3 -58.7 -61.5 68 -99 SPO 1997 04 04 23 16 32 3.1 -9 691.00 -61.4 -58.7 -61.6 67 -99 SPO 1997 04 04 23 17 29 3.3 -9 691.00 -61.6 -58.7 -61.8 67 -99 SPO 1997 04 04 23 18 27 3.4 -9 691.00 -61.8 -58.6 -61.9 67 -99 SPO 1997 04 04 23 19 27 3.4 -9 691.10 -62.0 -58.6 -62.0 67 -99 SPO 1997 04 04 23 20 27 3.4 -9 691.10 -62.2 -58.6 -62.1 68 -99 SPO 1997 04 04 23 21 27 3.3 -9 691.20 -62.2 -58.6 -62.1 66 -99 SPO 1997 04 04 23 22 27 3.1 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 23 27 3.1 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 24 27 3.0 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 25 25 3.1 -9 691.20 -62.3 -58.6 -62.0 65 -99 SPO 1997 04 04 23 26 23 3.1 -9 691.30 -62.1 -58.6 -61.8 64 -99 SPO 1997 04 04 23 27 19 3.3 -9 691.30 -61.8 -58.7 -61.6 63 -99 SPO 1997 04 04 23 28 22 3.5 -9 691.20 -61.6 -58.6 -61.4 63 -99 SPO 1997 04 04 23 29 24 3.8 -9 691.20 -61.4 -58.7 -61.2 62 -99 SPO 1997 04 04 23 30 23 4.1 -9 691.20 -61.2 -58.7 -61.2 62 -99 SPO 1997 04 04 23 31 23 4.3 -9 691.20 -61.2 -58.7 -61.0 62 -99 SPO 1997 04 04 23 32 21 4.4 -9 691.20 -60.9 -58.7 -60.8 62 -99 SPO 1997 04 04 23 33 22 4.3 -9 691.20 -60.6 -58.7 -60.4 62 -99 SPO 1997 04 04 23 34 25 4.5 -9 691.20 -60.4 -58.8 -60.2 62 -99 SPO 1997 04 04 23 35 26 4.3 -9 691.20 -60.2 -58.8 -60.2 63 -99 SPO 1997 04 04 23 36 27 4.3 -9 691.20 -60.1 -58.9 -60.3 64 -99 SPO 1997 04 04 23 37 26 4.5 -9 691.10 -60.1 -58.9 -60.3 65 -99 SPO 1997 04 04 23 38 24 4.6 -9 691.10 -60.0 -58.9 -60.2 65 -99 SPO 1997 04 04 23 39 24 4.7 -9 691.10 -60.0 -58.9 -60.2 65 -99 SPO 1997 04 04 23 40 24 4.8 -9 691.10 -59.9 -58.9 -60.1 64 -99 SPO 1997 04 04 23 41 22 4.8 -9 691.10 -59.8 -58.8 -60.0 64 -99 SPO 1997 04 04 23 42 22 4.9 -9 691.00 -59.7 -58.7 -59.8 64 -99 SPO 1997 04 04 23 43 23 4.9 -9 691.00 -59.6 -58.7 -59.8 65 -99 SPO 1997 04 04 23 44 23 5.0 -9 691.00 -59.6 -58.7 -59.8 66 -99 SPO 1997 04 04 23 45 24 5.0 -9 691.00 -59.6 -58.7 -59.8 67 -99 SPO 1997 04 04 23 46 25 5.0 -9 691.00 -59.5 -58.8 -59.7 67 -99 SPO 1997 04 04 23 47 26 4.8 -9 691.00 -59.5 -58.8 -59.7 68 -99 SPO 1997 04 04 23 48 28 4.7 -9 691.00 -59.5 -58.8 -59.6 69 -99 SPO 1997 04 04 23 49 29 4.9 -9 691.00 -59.4 -58.9 -59.6 69 -99 SPO 1997 04 04 23 50 29 4.6 -9 691.00 -59.4 -58.8 -59.5 69 -99 SPO 1997 04 04 23 51 28 4.9 -9 691.10 -59.3 -58.8 -59.4 68 -99 SPO 1997 04 04 23 52 27 4.7 -9 691.10 -59.2 -58.7 -59.3 68 -99 SPO 1997 04 04 23 53 28 4.7 -9 691.10 -59.2 -58.7 -59.2 67 -99 SPO 1997 04 04 23 54 27 4.7 -9 691.10 -59.0 -58.6 -59.2 65 -99 SPO 1997 04 04 23 55 26 4.9 -9 691.10 -59.0 -58.6 -59.0 66 -99 SPO 1997 04 04 23 56 25 4.8 -9 691.10 -58.9 -58.5 -59.0 66 -99 SPO 1997 04 04 23 57 25 5.0 -9 691.10 -58.8 -58.4 -58.9 66 -99 SPO 1997 04 04 23 58 26 5.0 -9 691.10 -58.8 -58.4 -58.8 -99 -99 SPO 1997 04 04 23 59 25 5.0 -9 691.00 -58.7 -58.4 -58.8 -99 -99 SPO 1997 04 05 00 00 25 5.1 -9 691.00 -58.7 -58.3 -58.8 -99 0 SPO 1997 04 05 00 01 25 5.1 -9 691.00 -58.6 -58.2 -58.8 -99 -99 SPO 1997 04 05 00 02 24 5.3 -9 690.90 -58.6 -58.2 -58.7 -99 -99 SPO 1997 04 05 00 03 24 5.1 -9 691.00 -58.6 -58.2 -58.7 -99 -99 SPO 1997 04 05 00 04 26 5.0 -9 691.00 -58.5 -58.1 -58.6 -99 -99 SPO 1997 04 05 00 05 27 4.9 -9 691.00 -58.5 -58.0 -58.6 -99 -99 SPO 1997 04 05 00 06 26 5.0 -9 691.00 -58.5 -57.9 -58.6 -99 -99 SPO 1997 04 05 00 07 25 4.7 -9 691.00 -58.4 -57.8 -58.5 -99 -99 SPO 1997 04 05 00 08 24 4.8 -9 691.00 -58.4 -57.8 -58.4 -99 -99 SPO 1997 04 05 00 09 22 4.7 -9 691.10 -58.3 -57.7 -58.4 -99 -99 SPO 1997 04 05 00 10 21 4.6 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 11 20 4.7 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 12 20 4.3 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 13 20 4.3 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 14 20 4.0 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 15 21 3.9 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 16 20 3.6 -9 691.30 -58.2 -57.6 -58.4 68 -99 SPO 1997 04 05 00 17 21 3.7 -9 691.30 -58.2 -57.6 -58.4 67 -99 SPO 1997 04 05 00 18 20 3.7 -9 691.30 -58.2 -57.7 -58.3 68 -99 SPO 1997 04 05 00 19 21 3.7 -9 691.30 -58.2 -57.8 -58.4 69 -99 SPO 1997 04 05 00 20 20 4.0 -9 691.30 -58.3 -57.8 -58.4 71 -99 SPO 1997 04 05 00 21 19 4.0 -9 691.30 -58.3 -57.7 -58.4 71 -99 SPO 1997 04 05 00 22 17 3.9 -9 691.30 -58.3 -57.7 -58.4 71 -99 SPO 1997 04 05 00 23 16 3.8 -9 691.30 -58.3 -57.6 -58.4 70 -99 SPO 1997 04 05 00 24 15 3.9 -9 691.30 -58.3 -57.6 -58.4 69 -99 SPO 1997 04 05 00 25 14 4.2 -9 691.30 -58.3 -57.5 -58.4 68 -99 SPO 1997 04 05 00 26 15 4.3 -9 691.20 -58.4 -57.4 -58.4 68 -99 SPO 1997 04 05 00 27 18 4.5 -9 691.20 -58.4 -57.4 -58.5 66 -99 SPO 1997 04 05 00 28 19 4.6 -9 691.20 -58.4 -57.3 -58.5 66 -99 SPO 1997 04 05 00 29 19 4.7 -9 691.20 -58.5 -57.3 -58.6 66 -99 SPO 1997 04 05 00 30 22 4.5 -9 691.20 -58.5 -57.3 -58.6 66 -99 SPO 1997 04 05 00 31 23 4.6 -9 691.20 -58.6 -57.3 -58.6 67 -99 SPO 1997 04 05 00 32 25 4.7 -9 691.20 -58.6 -57.3 -58.6 67 -99 SPO 1997 04 05 00 33 26 4.7 -9 691.20 -58.6 -57.4 -58.6 67 -99 SPO 1997 04 05 00 34 27 4.7 -9 691.20 -58.6 -57.4 -58.6 67 -99 SPO 1997 04 05 00 35 27 4.6 -9 691.20 -58.6 -57.6 -58.7 67 -99 SPO 1997 04 05 00 36 27 4.9 -9 691.20 -58.7 -57.6 -58.7 67 -99 SPO 1997 04 05 00 37 26 5.0 -9 691.20 -58.7 -57.6 -58.7 66 -99 SPO 1997 04 05 00 38 25 5.0 -9 691.20 -58.7 -57.7 -58.7 65 -99 SPO 1997 04 05 00 39 25 4.9 -9 691.20 -58.7 -57.7 -58.8 65 -99 SPO 1997 04 05 00 40 23 5.0 -9 691.20 -58.8 -57.7 -58.8 65 -99 SPO 1997 04 05 00 41 21 5.0 -9 691.20 -58.8 -57.8 -58.9 65 -99 SPO 1997 04 05 00 42 20 5.0 -9 691.20 -58.8 -57.8 -58.9 65 -99 SPO 1997 04 05 00 43 19 5.1 -9 691.20 -58.9 -57.8 -58.9 66 -99 SPO 1997 04 05 00 44 18 5.1 -9 691.30 -58.9 -57.8 -58.9 66 -99 SPO 1997 04 05 00 45 18 5.0 -9 691.30 -58.9 -57.8 -59.0 66 -99 SPO 1997 04 05 00 46 18 5.0 -9 691.30 -59.0 -57.8 -59.0 67 -99 SPO 1997 04 05 00 47 19 4.8 -9 691.30 -59.0 -57.8 -59.1 66 -99 SPO 1997 04 05 00 48 20 4.7 -9 691.30 -59.1 -57.9 -59.2 65 -99 SPO 1997 04 05 00 49 20 4.6 -9 691.30 -59.2 -57.9 -59.2 65 -99 SPO 1997 04 05 00 50 22 4.7 -9 691.30 -59.2 -58.0 -59.2 65 -99 SPO 1997 04 05 00 51 23 4.4 -9 691.30 -59.3 -58.0 -59.2 65 -99 SPO 1997 04 05 00 52 25 4.4 -9 691.30 -59.3 -58.1 -59.3 65 -99 SPO 1997 04 05 00 53 27 4.5 -9 691.30 -59.3 -58.2 -59.3 65 -99 SPO 1997 04 05 00 54 29 4.3 -9 691.30 -59.4 -58.4 -59.3 65 -99 SPO 1997 04 05 00 55 31 4.3 -9 691.30 -59.4 -58.4 -59.4 65 -99 SPO 1997 04 05 00 56 32 4.2 -9 691.30 -59.4 -58.5 -59.5 65 -99 SPO 1997 04 05 00 57 32 4.3 -9 691.30 -59.5 -58.5 -59.5 66 -99 SPO 1997 04 05 00 58 31 4.4 -9 691.30 -59.5 -58.6 -59.6 65 -99 SPO 1997 04 05 00 59 29 4.4 -9 691.30 -59.6 -58.6 -59.6 65 -99 SPO 1997 04 05 01 00 27 4.6 -9 691.30 -59.6 -58.6 -59.6 64 0 SPO 1997 04 05 01 01 27 4.4 -9 691.30 -59.6 -58.5 -59.6 64 -99 SPO 1997 04 05 01 02 25 4.3 -9 691.30 -59.6 -58.5 -59.6 64 -99 SPO 1997 04 05 01 03 24 4.0 -9 691.40 -59.6 -58.6 -59.6 64 -99 SPO 1997 04 05 01 04 23 3.7 -9 691.40 -59.6 -58.6 -59.6 64 -99 SPO 1997 04 05 01 05 25 3.6 -9 691.40 -59.6 -58.7 -59.6 64 -99 SPO 1997 04 05 01 06 26 3.6 -9 691.40 -59.6 -58.8 -59.6 64 -99 SPO 1997 04 05 01 07 27 3.5 -9 691.40 -59.6 -58.9 -59.6 65 -99 SPO 1997 04 05 01 08 24 3.4 -9 691.50 -59.6 -59.0 -59.7 65 -99 SPO 1997 04 05 01 09 23 3.5 -9 691.50 -59.6 -59.0 -59.6 65 -99 SPO 1997 04 05 01 10 22 3.6 -9 691.50 -59.6 -59.0 -59.6 64 -99 SPO 1997 04 05 01 11 23 3.7 -9 691.50 -59.6 -59.0 -59.6 64 -99 SPO 1997 04 05 01 12 22 3.7 -9 691.50 -59.5 -58.9 -59.6 63 -99 SPO 1997 04 05 01 13 20 3.8 -9 691.60 -59.5 -58.9 -59.5 63 -99 SPO 1997 04 05 01 14 20 3.8 -9 691.60 -59.5 -58.9 -59.5 63 -99 SPO 1997 04 05 01 15 18 3.8 -9 691.60 -59.4 -58.8 -59.5 62 -99 SPO 1997 04 05 01 16 19 4.0 -9 691.60 -59.4 -58.8 -59.5 63 -99 SPO 1997 04 05 01 17 19 4.0 -9 691.60 -59.4 -58.7 -59.4 64 -99 SPO 1997 04 05 01 18 19 4.0 -9 691.60 -59.3 -58.7 -59.4 63 -99 SPO 1997 04 05 01 19 18 3.9 -9 691.60 -59.3 -58.6 -59.4 63 -99 SPO 1997 04 05 01 20 18 3.8 -9 691.60 -59.3 -58.6 -59.4 64 -99 SPO 1997 04 05 01 21 18 3.7 -9 691.70 -59.3 -58.7 -59.3 64 -99 SPO 1997 04 05 01 22 18 3.8 -9 691.70 -59.3 -58.7 -59.3 64 -99 SPO 1997 04 05 01 23 18 3.7 -9 691.70 -59.2 -58.7 -59.3 64 -99 SPO 1997 04 05 01 24 19 3.8 -9 691.70 -59.2 -58.6 -59.2 64 -99 SPO 1997 04 05 01 25 21 3.9 -9 691.70 -59.2 -58.6 -59.2 64 -99 SPO 1997 04 05 01 26 22 4.0 -9 691.70 -59.1 -58.6 -59.2 64 -99 SPO 1997 04 05 01 27 23 4.2 -9 691.60 -59.1 -58.5 -59.2 65 -99 SPO 1997 04 05 01 28 24 4.4 -9 691.60 -59.1 -58.4 -59.2 65 -99 SPO 1997 04 05 01 29 25 4.6 -9 691.60 -59.0 -58.4 -59.1 64 -99 SPO 1997 04 05 01 30 26 4.6 -9 691.60 -59.0 -58.3 -59.1 65 -99 SPO 1997 04 05 01 31 26 4.6 -9 691.60 -59.0 -58.4 -59.1 65 -99 SPO 1997 04 05 01 32 26 4.5 -9 691.50 -59.0 -58.4 -59.1 65 -99 SPO 1997 04 05 01 33 26 4.6 -9 691.60 -59.0 -58.3 -59.2 64 -99 SPO 1997 04 05 01 34 26 4.6 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 35 25 4.7 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 36 24 4.7 -9 691.60 -59.1 -58.3 -59.2 62 -99 SPO 1997 04 05 01 37 23 4.7 -9 691.60 -59.1 -58.3 -59.1 62 -99 SPO 1997 04 05 01 38 22 4.7 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 39 21 4.7 -9 691.60 -59.1 -58.2 -59.2 64 -99 SPO 1997 04 05 01 40 19 4.8 -9 691.60 -59.1 -58.1 -59.2 65 -99 SPO 1997 04 05 01 41 19 4.9 -9 691.60 -59.1 -58.0 -59.2 65 -99 SPO 1997 04 05 01 42 18 5.0 -9 691.60 -59.1 -58.0 -59.1 65 -99 SPO 1997 04 05 01 43 17 4.8 -9 691.60 -59.1 -58.0 -59.1 65 -99 SPO 1997 04 05 01 44 16 4.8 -9 691.70 -59.0 -58.1 -59.1 65 -99 SPO 1997 04 05 01 45 16 4.5 -9 691.70 -59.0 -58.1 -59.1 64 -99 SPO 1997 04 05 01 46 17 4.5 -9 691.80 -59.0 -58.2 -59.0 64 -99 SPO 1997 04 05 01 47 18 4.3 -9 691.80 -59.0 -58.2 -59.0 63 -99 SPO 1997 04 05 01 48 20 4.2 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 49 21 4.0 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 50 22 3.8 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 51 22 3.5 -9 691.90 -58.9 -58.4 -59.0 62 -99 SPO 1997 04 05 01 52 21 3.4 -9 692.00 -58.9 -58.5 -59.0 63 -99 SPO 1997 04 05 01 53 22 3.3 -9 692.00 -58.9 -58.6 -59.0 63 -99 SPO 1997 04 05 01 54 22 3.4 -9 692.00 -58.9 -58.6 -59.0 63 -99 SPO 1997 04 05 01 55 22 3.8 -9 692.00 -58.9 -58.6 -58.9 63 -99 SPO 1997 04 05 01 56 23 4.0 -9 691.90 -58.9 -58.5 -58.9 64 -99 SPO 1997 04 05 01 57 24 4.3 -9 691.90 -58.8 -58.6 -58.9 63 -99 SPO 1997 04 05 01 58 23 4.3 -9 691.90 -58.8 -58.5 -58.9 63 -99 SPO 1997 04 05 01 59 21 4.6 -9 691.90 -58.8 -58.4 -58.9 63 -99 SPO 1997 04 05 02 00 19 4.4 -9 691.90 -58.8 -58.4 -58.8 64 0 SPO 1997 04 05 02 01 19 4.5 -9 691.90 -58.7 -58.3 -58.8 63 -99 SPO 1997 04 05 02 02 19 4.5 -9 691.90 -58.7 -58.3 -58.7 64 -99 SPO 1997 04 05 02 03 19 4.5 -9 691.90 -58.6 -58.3 -58.7 64 -99 SPO 1997 04 05 02 04 20 4.7 -9 691.80 -58.6 -58.3 -58.6 64 -99 SPO 1997 04 05 02 05 21 4.8 -9 691.80 -58.5 -58.3 -58.6 64 -99 SPO 1997 04 05 02 06 22 4.8 -9 691.80 -58.5 -58.3 -58.6 64 -99 SPO 1997 04 05 02 07 24 4.7 -9 691.80 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 08 24 4.6 -9 691.70 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 09 22 4.9 -9 691.70 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 10 21 4.8 -9 691.60 -58.4 -58.4 -58.5 64 -99 SPO 1997 04 05 02 11 20 4.8 -9 691.60 -58.4 -58.4 -58.5 64 -99 SPO 1997 04 05 02 12 19 4.7 -9 691.60 -58.4 -58.4 -58.5 65 -99 SPO 1997 04 05 02 13 18 4.8 -9 691.60 -58.4 -58.4 -58.5 66 -99 SPO 1997 04 05 02 14 16 5.1 -9 691.60 -58.4 -58.4 -58.4 66 -99 SPO 1997 04 05 02 15 15 5.0 -9 691.60 -58.3 -58.3 -58.4 66 -99 SPO 1997 04 05 02 16 16 5.5 -9 691.50 -58.3 -58.3 -58.4 66 -99 SPO 1997 04 05 02 17 15 5.4 -9 691.50 -58.3 -58.3 -58.3 67 -99 SPO 1997 04 05 02 18 15 5.4 -9 691.50 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 19 14 5.5 -9 691.50 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 20 15 5.5 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 21 14 5.6 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 22 14 5.8 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 23 14 5.7 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 24 13 5.4 -9 691.40 -58.2 -58.3 -58.3 66 -99 SPO 1997 04 05 02 25 12 6.0 -9 691.40 -58.2 -58.3 -58.3 66 -99 SPO 1997 04 05 02 26 11 5.9 -9 691.40 -58.3 -58.2 -58.3 67 -99 SPO 1997 04 05 02 27 10 6.0 -9 691.40 -58.3 -58.3 -58.4 68 -99 SPO 1997 04 05 02 28 10 6.1 -9 691.40 -58.2 -58.2 -58.3 66 -99 SPO 1997 04 05 02 29 8 5.9 -9 691.40 -58.2 -58.2 -58.3 66 -99 SPO 1997 04 05 02 30 10 6.1 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 31 9 5.9 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 32 8 5.9 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 33 9 5.9 -9 691.40 -58.2 -58.1 -58.3 63 -99 SPO 1997 04 05 02 34 9 6.0 -9 691.40 -58.2 -58.1 -58.3 63 -99 SPO 1997 04 05 02 35 9 6.3 -9 691.40 -58.2 -58.0 -58.3 64 -99 SPO 1997 04 05 02 36 9 6.0 -9 691.50 -58.2 -58.0 -58.3 64 -99 SPO 1997 04 05 02 37 10 5.9 -9 691.50 -58.2 -58.0 -58.2 64 -99 SPO 1997 04 05 02 38 11 6.0 -9 691.50 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 39 11 6.2 -9 691.40 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 40 13 5.8 -9 691.50 -58.2 -58.1 -58.3 66 -99 SPO 1997 04 05 02 41 12 5.7 -9 691.50 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 42 12 5.9 -9 691.40 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 43 11 5.8 -9 691.40 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 44 10 6.0 -9 691.30 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 45 9 5.7 -9 691.40 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 46 7 5.8 -9 691.40 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 47 6 6.0 -9 691.40 -58.2 -58.0 -58.2 65 -99 SPO 1997 04 05 02 48 6 6.1 -9 691.50 -58.2 -58.0 -58.2 65 -99 SPO 1997 04 05 02 49 5 6.2 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 50 6 6.1 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 51 4 6.0 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 52 4 6.1 -9 691.40 -58.1 -58.0 -58.2 66 -99 SPO 1997 04 05 02 53 4 6.1 -9 691.40 -58.1 -58.0 -58.2 64 -99 SPO 1997 04 05 02 54 3 6.2 -9 691.40 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 05 02 55 3 6.2 -9 691.40 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 05 02 56 3 6.2 -9 691.40 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 57 3 6.3 -9 691.40 -58.1 -58.1 -58.3 63 -99 SPO 1997 04 05 02 58 2 6.2 -9 691.40 -58.2 -58.2 -58.2 65 -99 SPO 1997 04 05 02 59 4 6.0 -9 691.40 -58.2 -58.2 -58.2 65 -99 SPO 1997 04 05 03 00 5 6.3 -9 691.40 -58.2 -58.2 -58.2 66 0 SPO 1997 04 05 03 01 5 6.3 -9 691.40 -58.1 -58.1 -58.2 66 -99 SPO 1997 04 05 03 02 4 6.1 -9 691.40 -58.1 -58.1 -58.2 66 -99 SPO 1997 04 05 03 03 3 6.1 -9 691.40 -58.1 -58.0 -58.1 66 -99 SPO 1997 04 05 03 04 2 5.9 -9 691.40 -58.0 -58.0 -58.1 66 -99 SPO 1997 04 05 03 05 3 6.3 -9 691.40 -58.0 -58.0 -58.0 66 -99 SPO 1997 04 05 03 06 3 6.2 -9 691.30 -58.0 -58.0 -58.0 66 -99 SPO 1997 04 05 03 07 3 6.0 -9 691.40 -57.9 -57.9 -57.9 66 -99 SPO 1997 04 05 03 08 5 6.1 -9 691.40 -57.9 -57.9 -57.9 66 -99 SPO 1997 04 05 03 09 6 6.2 -9 691.40 -57.8 -57.9 -57.9 65 -99 SPO 1997 04 05 03 10 8 6.1 -9 691.40 -57.8 -57.9 -57.8 66 -99 SPO 1997 04 05 03 11 9 5.8 -9 691.40 -57.8 -57.9 -57.8 67 -99 SPO 1997 04 05 03 12 8 6.0 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 13 6 6.3 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 14 6 6.3 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 15 7 6.0 -9 691.40 -57.7 -57.8 -57.8 67 -99 SPO 1997 04 05 03 16 4 6.5 -9 691.30 -57.7 -57.8 -57.8 66 -99 SPO 1997 04 05 03 17 3 6.5 -9 691.30 -57.7 -57.8 -57.8 66 -99 SPO 1997 04 05 03 18 1 6.8 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 19 1 6.7 -9 691.20 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 20 359 7.1 -9 691.20 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 21 360 6.5 -9 691.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 22 360 6.9 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 23 360 7.0 -9 691.20 -57.6 -57.6 -57.7 67 -99 SPO 1997 04 05 03 24 0 6.8 -9 691.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 05 03 25 1 7.0 -9 691.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 05 03 26 2 6.8 -9 691.30 -57.5 -57.7 -57.6 66 -99 SPO 1997 04 05 03 27 3 6.3 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 28 4 6.3 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 29 3 6.5 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 30 4 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 31 4 6.8 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 32 3 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 33 3 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 34 3 6.8 -9 691.30 -57.6 -57.8 -57.7 67 -99 SPO 1997 04 05 03 35 2 7.4 -9 691.20 -57.6 -57.8 -57.7 67 -99 SPO 1997 04 05 03 36 2 7.4 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 37 2 7.1 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 38 2 7.4 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 39 2 7.3 -9 691.30 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 40 360 7.5 -9 691.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 41 359 7.3 -9 691.30 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 42 359 7.0 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 43 359 6.9 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 44 358 7.2 -9 691.30 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 45 358 7.2 -9 691.30 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 46 358 7.2 -9 691.20 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 47 359 6.8 -9 691.30 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 48 359 7.0 -9 691.30 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 49 0 6.9 -9 691.30 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 05 03 50 1 6.8 -9 691.30 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 05 03 51 1 6.7 -9 691.40 -57.6 -57.6 -57.7 64 -99 SPO 1997 04 05 03 52 1 6.8 -9 691.40 -57.6 -57.6 -57.6 64 -99 SPO 1997 04 05 03 53 0 7.2 -9 691.40 -57.5 -57.6 -57.6 63 -99 SPO 1997 04 05 03 54 359 6.7 -9 691.40 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 05 03 55 0 6.8 -9 691.50 -57.5 -57.5 -57.6 66 -99 SPO 1997 04 05 03 56 1 6.8 -9 691.50 -57.5 -57.5 -57.5 66 -99 SPO 1997 04 05 03 57 1 6.6 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 03 58 2 6.7 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 03 59 1 6.6 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 04 00 2 6.4 -9 691.40 -57.4 -57.5 -57.5 65 0 SPO 1997 04 05 04 01 1 6.5 -9 691.50 -57.4 -57.4 -57.5 64 -99 SPO 1997 04 05 04 02 1 6.5 -9 691.50 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 05 04 03 360 6.7 -9 691.50 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 05 04 04 359 6.7 -9 691.40 -57.4 -57.3 -57.4 63 -99 SPO 1997 04 05 04 05 360 6.5 -9 691.40 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 05 04 06 1 6.7 -9 691.50 -57.3 -57.2 -57.4 64 -99 SPO 1997 04 05 04 07 2 6.2 -9 691.50 -57.3 -57.1 -57.3 65 -99 SPO 1997 04 05 04 08 2 6.1 -9 691.50 -57.2 -57.0 -57.3 65 -99 SPO 1997 04 05 04 09 1 6.5 -9 691.50 -57.2 -57.0 -57.2 65 -99 SPO 1997 04 05 04 10 1 6.3 -9 691.50 -57.2 -56.9 -57.2 66 -99 SPO 1997 04 05 04 11 2 6.2 -9 691.50 -57.1 -56.9 -57.2 65 -99 SPO 1997 04 05 04 12 3 6.1 -9 691.50 -57.1 -56.8 -57.1 65 -99 SPO 1997 04 05 04 13 3 6.5 -9 691.50 -57.1 -56.8 -57.1 65 -99 SPO 1997 04 05 04 14 5 6.4 -9 691.60 -57.0 -56.8 -57.1 64 -99 SPO 1997 04 05 04 15 5 6.2 -9 691.60 -57.0 -56.9 -57.1 64 -99 SPO 1997 04 05 04 16 4 5.8 -9 691.60 -57.0 -57.0 -57.1 65 -99 SPO 1997 04 05 04 17 5 5.8 -9 691.60 -57.0 -56.9 -57.1 66 -99 SPO 1997 04 05 04 18 7 5.6 -9 691.70 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 19 11 4.9 -9 691.70 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 20 14 5.0 -9 691.80 -56.9 -56.9 -57.0 67 -99 SPO 1997 04 05 04 21 16 4.7 -9 691.80 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 22 16 4.6 -9 691.80 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 23 16 4.4 -9 691.90 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 24 15 4.1 -9 691.90 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 25 13 4.1 -9 691.90 -57.0 -56.9 -57.1 66 -99 SPO 1997 04 05 04 26 13 4.4 -9 691.90 -57.0 -56.9 -57.0 65 -99 SPO 1997 04 05 04 27 14 4.7 -9 691.90 -56.9 -56.9 -57.0 65 -99 SPO 1997 04 05 04 28 12 5.2 -9 691.90 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 29 10 4.9 -9 691.90 -56.9 -57.0 -57.0 66 -99 SPO 1997 04 05 04 30 9 5.4 -9 691.80 -56.9 -57.0 -57.1 66 -99 SPO 1997 04 05 04 31 6 5.2 -9 691.80 -57.0 -57.1 -57.1 68 -99 SPO 1997 04 05 04 32 6 5.2 -9 691.80 -57.0 -57.1 -57.1 67 -99 SPO 1997 04 05 04 33 6 5.2 -9 691.80 -56.9 -57.2 -57.1 66 -99 SPO 1997 04 05 04 34 5 5.1 -9 691.80 -57.0 -57.2 -57.1 67 -99 SPO 1997 04 05 04 35 4 5.1 -9 691.80 -57.0 -57.2 -57.1 66 -99 SPO 1997 04 05 04 36 5 5.5 -9 691.80 -57.0 -57.2 -57.1 65 -99 SPO 1997 04 05 04 37 1 5.6 -9 691.80 -57.0 -57.1 -57.1 65 -99 SPO 1997 04 05 04 38 1 6.2 -9 691.70 -57.0 -57.1 -57.0 65 -99 SPO 1997 04 05 04 39 1 5.8 -9 691.70 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 05 04 40 360 6.2 -9 691.70 -56.9 -57.0 -57.0 65 -99 SPO 1997 04 05 04 41 0 6.2 -9 691.70 -56.9 -57.0 -57.0 66 -99 SPO 1997 04 05 04 42 0 6.0 -9 691.70 -56.9 -57.1 -57.0 66 -99 SPO 1997 04 05 04 43 359 6.2 -9 691.70 -56.9 -57.0 -57.0 68 -99 SPO 1997 04 05 04 44 360 6.5 -9 691.70 -56.9 -57.0 -56.9 68 -99 SPO 1997 04 05 04 45 360 6.3 -9 691.70 -56.8 -57.0 -56.9 67 -99 SPO 1997 04 05 04 46 359 6.5 -9 691.80 -56.8 -57.0 -56.8 66 -99 SPO 1997 04 05 04 47 355 6.2 -9 691.80 -56.8 -57.0 -56.8 67 -99 SPO 1997 04 05 04 48 357 6.8 -9 691.80 -56.7 -56.9 -56.8 65 -99 SPO 1997 04 05 04 49 357 6.6 -9 691.90 -56.7 -56.9 -56.7 65 -99 SPO 1997 04 05 04 50 357 6.7 -9 691.90 -56.7 -56.8 -56.7 66 -99 SPO 1997 04 05 04 51 358 6.5 -9 691.90 -56.6 -56.8 -56.6 65 -99 SPO 1997 04 05 04 52 358 6.5 -9 691.90 -56.6 -56.8 -56.6 67 -99 SPO 1997 04 05 04 53 358 6.9 -9 691.90 -56.5 -56.8 -56.6 66 -99 SPO 1997 04 05 04 54 359 6.7 -9 691.90 -56.5 -56.7 -56.6 66 -99 SPO 1997 04 05 04 55 358 7.1 -9 691.90 -56.5 -56.7 -56.6 67 -99 SPO 1997 04 05 04 56 359 6.9 -9 691.90 -56.5 -56.7 -56.6 68 -99 SPO 1997 04 05 04 57 358 7.8 -9 691.80 -56.5 -56.7 -56.6 68 -99 SPO 1997 04 05 04 58 358 7.8 -9 691.80 -56.4 -56.6 -56.6 67 -99 SPO 1997 04 05 04 59 358 7.5 -9 691.80 -56.4 -56.6 -56.6 67 -99 SPO 1997 04 05 05 00 359 7.2 -9 691.70 -56.4 -56.6 -56.6 67 0 SPO 1997 04 05 05 01 359 7.7 -9 691.60 -56.4 -56.6 -56.6 66 -99 SPO 1997 04 05 05 02 358 8.6 -9 691.60 -56.4 -56.6 -56.6 66 -99 SPO 1997 04 05 05 03 356 8.7 -9 691.60 -56.4 -56.7 -56.6 67 -99 SPO 1997 04 05 05 04 356 8.6 -9 691.60 -56.4 -56.7 -56.6 67 -99 SPO 1997 04 05 05 05 356 8.3 -9 691.60 -56.5 -56.7 -56.6 69 -99 SPO 1997 04 05 05 06 358 8.5 -9 691.50 -56.5 -56.6 -56.5 68 -99 SPO 1997 04 05 05 07 358 8.5 -9 691.50 -56.5 -56.6 -56.5 69 -99 SPO 1997 04 05 05 08 355 8.3 -9 691.50 -56.5 -56.5 -56.5 69 -99 SPO 1997 04 05 05 09 354 8.9 -9 691.50 -56.4 -56.5 -56.4 67 -99 SPO 1997 04 05 05 10 356 8.4 -9 691.50 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 05 05 11 355 9.2 -9 691.50 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 05 05 12 355 9.4 -9 691.40 -56.3 -56.4 -56.5 66 -99 SPO 1997 04 05 05 13 356 9.2 -9 691.40 -56.3 -56.4 -56.5 66 -99 SPO 1997 04 05 05 14 355 9.0 -9 691.50 -56.3 -56.3 -56.5 66 -99 SPO 1997 04 05 05 15 356 8.5 -9 691.50 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 16 357 8.9 -9 691.50 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 17 358 8.7 -9 691.40 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 18 358 8.7 -9 691.50 -56.3 -56.2 -56.4 67 -99 SPO 1997 04 05 05 19 357 8.6 -9 691.50 -56.2 -56.2 -56.3 66 -99 SPO 1997 04 05 05 20 358 8.4 -9 691.50 -56.2 -56.2 -56.2 66 -99 SPO 1997 04 05 05 21 356 8.8 -9 691.50 -56.2 -56.1 -56.2 66 -99 SPO 1997 04 05 05 22 357 8.8 -9 691.50 -56.2 -56.1 -56.2 66 -99 SPO 1997 04 05 05 23 358 8.5 -9 691.50 -56.1 -56.1 -56.2 66 -99 SPO 1997 04 05 05 24 357 8.9 -9 691.50 -56.1 -56.1 -56.2 66 -99 SPO 1997 04 05 05 25 358 8.7 -9 691.50 -56.1 -56.1 -56.1 66 -99 SPO 1997 04 05 05 26 358 8.8 -9 691.40 -56.1 -56.0 -56.2 67 -99 SPO 1997 04 05 05 27 357 9.1 -9 691.40 -56.1 -56.0 -56.2 68 -99 SPO 1997 04 05 05 28 358 8.8 -9 691.50 -56.0 -56.0 -56.2 67 -99 SPO 1997 04 05 05 29 358 9.0 -9 691.40 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 30 357 8.8 -9 691.40 -56.0 -55.9 -56.1 68 -99 SPO 1997 04 05 05 31 357 8.9 -9 691.50 -56.0 -55.8 -56.1 68 -99 SPO 1997 04 05 05 32 357 8.6 -9 691.50 -56.0 -55.8 -56.0 67 -99 SPO 1997 04 05 05 33 357 8.8 -9 691.50 -55.9 -55.8 -56.0 66 -99 SPO 1997 04 05 05 34 358 9.0 -9 691.40 -55.9 -55.8 -56.1 66 -99 SPO 1997 04 05 05 35 356 9.3 -9 691.40 -55.9 -55.9 -56.1 66 -99 SPO 1997 04 05 05 36 356 9.3 -9 691.40 -56.0 -56.0 -56.1 66 -99 SPO 1997 04 05 05 37 356 9.1 -9 691.40 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 38 355 8.9 -9 691.50 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 39 355 8.9 -9 691.50 -56.0 -56.0 -56.0 68 -99 SPO 1997 04 05 05 40 356 8.8 -9 691.50 -55.9 -55.8 -56.0 67 -99 SPO 1997 04 05 05 41 357 8.4 -9 691.50 -55.9 -55.8 -55.9 67 -99 SPO 1997 04 05 05 42 357 9.1 -9 691.50 -55.9 -55.8 -56.0 68 -99 SPO 1997 04 05 05 43 356 9.8 -9 691.50 -55.9 -55.9 -56.1 68 -99 SPO 1997 04 05 05 44 355 9.2 -9 691.50 -56.0 -55.9 -56.1 68 -99 SPO 1997 04 05 05 45 354 9.3 -9 691.50 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 05 05 46 354 9.0 -9 691.50 -55.9 -56.0 -56.0 66 -99 SPO 1997 04 05 05 47 354 9.5 -9 691.50 -55.9 -55.9 -56.0 66 -99 SPO 1997 04 05 05 48 355 9.2 -9 691.50 -55.9 -55.9 -56.0 66 -99 SPO 1997 04 05 05 49 356 9.0 -9 691.50 -55.9 -56.0 -56.0 66 -99 SPO 1997 04 05 05 50 355 9.5 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 51 356 9.4 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 52 356 9.7 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 53 355 9.5 -9 691.50 -55.9 -56.1 -56.0 67 -99 SPO 1997 04 05 05 54 355 9.0 -9 691.50 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 55 356 9.4 -9 691.50 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 56 356 9.4 -9 691.60 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 57 355 9.5 -9 691.60 -55.9 -56.0 -55.9 65 -99 SPO 1997 04 05 05 58 355 9.2 -9 691.50 -55.8 -56.0 -55.9 65 -99 SPO 1997 04 05 05 59 356 9.1 -9 691.60 -55.8 -55.9 -55.8 65 -99 SPO 1997 04 05 06 00 355 9.6 -9 691.60 -55.8 -55.8 -55.8 65 0 SPO 1997 04 05 06 01 355 8.9 -9 691.60 -55.7 -55.8 -55.7 66 -99 SPO 1997 04 05 06 02 355 9.4 -9 691.60 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 05 06 03 355 9.2 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 04 354 9.2 -9 691.60 -55.6 -55.7 -55.7 66 -99 SPO 1997 04 05 06 05 355 9.1 -9 691.60 -55.6 -55.6 -55.6 67 -99 SPO 1997 04 05 06 06 355 9.6 -9 691.60 -55.5 -55.6 -55.6 66 -99 SPO 1997 04 05 06 07 354 9.7 -9 691.60 -55.5 -55.6 -55.7 65 -99 SPO 1997 04 05 06 08 353 9.5 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 09 354 8.9 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 10 354 9.6 -9 691.50 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 11 354 9.7 -9 691.50 -55.4 -55.6 -55.5 65 -99 SPO 1997 04 05 06 12 355 9.1 -9 691.50 -55.4 -55.6 -55.4 65 -99 SPO 1997 04 05 06 13 355 9.6 -9 691.50 -55.4 -55.6 -55.4 66 -99 SPO 1997 04 05 06 14 355 9.5 -9 691.50 -55.3 -55.5 -55.4 66 -99 SPO 1997 04 05 06 15 355 9.4 -9 691.50 -55.3 -55.5 -55.4 67 -99 SPO 1997 04 05 06 16 355 9.6 -9 691.50 -55.3 -55.5 -55.4 68 -99 SPO 1997 04 05 06 17 356 10.1 -9 691.50 -55.3 -55.5 -55.4 68 -99 SPO 1997 04 05 06 18 355 9.6 -9 691.40 -55.3 -55.4 -55.3 68 -99 SPO 1997 04 05 06 19 356 9.9 -9 691.40 -55.3 -55.4 -55.3 68 -99 SPO 1997 04 05 06 20 356 9.8 -9 691.40 -55.2 -55.5 -55.3 66 -99 SPO 1997 04 05 06 21 356 10.2 -9 691.40 -55.1 -55.4 -55.3 66 -99 SPO 1997 04 05 06 22 356 10.0 -9 691.40 -55.1 -55.3 -55.3 66 -99 SPO 1997 04 05 06 23 357 9.5 -9 691.40 -55.1 -55.3 -55.2 66 -99 SPO 1997 04 05 06 24 357 9.7 -9 691.40 -55.1 -55.3 -55.2 66 -99 SPO 1997 04 05 06 25 356 9.7 -9 691.40 -55.1 -55.3 -55.1 66 -99 SPO 1997 04 05 06 26 356 10.0 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 27 356 9.6 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 28 357 9.8 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 29 357 10.1 -9 691.50 -55.0 -55.3 -55.1 68 -99 SPO 1997 04 05 06 30 355 9.7 -9 691.50 -55.0 -55.3 -55.1 68 -99 SPO 1997 04 05 06 31 356 9.0 -9 691.50 -55.0 -55.2 -55.0 67 -99 SPO 1997 04 05 06 32 356 9.4 -9 691.50 -54.9 -55.2 -55.0 66 -99 SPO 1997 04 05 06 33 355 9.7 -9 691.50 -54.9 -55.1 -55.0 66 -99 SPO 1997 04 05 06 34 355 9.6 -9 691.60 -54.8 -55.1 -54.9 66 -99 SPO 1997 04 05 06 35 355 8.6 -9 691.60 -54.8 -55.0 -54.8 67 -99 SPO 1997 04 05 06 36 358 9.7 -9 691.60 -54.8 -55.0 -54.8 69 -99 SPO 1997 04 05 06 37 355 9.7 -9 691.60 -54.7 -54.8 -54.8 68 -99 SPO 1997 04 05 06 38 356 9.0 -9 691.60 -54.7 -54.8 -54.8 69 -99 SPO 1997 04 05 06 39 355 9.9 -9 691.70 -54.7 -54.8 -54.7 70 -99 SPO 1997 04 05 06 40 353 9.7 -9 691.70 -54.6 -54.7 -54.7 68 -99 SPO 1997 04 05 06 41 355 9.0 -9 691.70 -54.6 -54.7 -54.7 68 -99 SPO 1997 04 05 06 42 354 9.2 -9 691.70 -54.6 -54.8 -54.7 67 -99 SPO 1997 04 05 06 43 352 9.2 -9 691.70 -54.6 -54.8 -54.7 67 -99 SPO 1997 04 05 06 44 353 8.8 -9 691.80 -54.6 -54.8 -54.6 67 -99 SPO 1997 04 05 06 45 352 8.4 -9 691.80 -54.5 -54.7 -54.6 67 -99 SPO 1997 04 05 06 46 353 9.0 -9 691.80 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 05 06 47 353 8.6 -9 691.80 -54.5 -54.8 -54.6 68 -99 SPO 1997 04 05 06 48 352 8.7 -9 691.80 -54.5 -54.8 -54.6 69 -99 SPO 1997 04 05 06 49 353 8.2 -9 691.90 -54.5 -54.7 -54.6 69 -99 SPO 1997 04 05 06 50 354 8.5 -9 691.90 -54.5 -54.7 -54.6 68 -99 SPO 1997 04 05 06 51 354 9.2 -9 691.90 -54.5 -54.8 -54.6 69 -99 SPO 1997 04 05 06 52 354 9.0 -9 691.80 -54.5 -54.8 -54.7 69 -99 SPO 1997 04 05 06 53 353 8.7 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 54 355 8.6 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 55 353 9.3 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 56 353 8.9 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 57 352 8.7 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 58 353 8.9 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 59 353 9.2 -9 691.80 -54.4 -54.7 -54.6 68 -99 SPO 1997 04 05 07 00 354 8.5 -9 691.80 -54.4 -54.7 -54.5 69 0 SPO 1997 04 05 07 01 354 8.8 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 02 354 8.9 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 03 354 8.9 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 04 354 8.8 -9 691.90 -54.4 -54.7 -54.5 68 -99 SPO 1997 04 05 07 05 355 8.1 -9 691.90 -54.4 -54.7 -54.5 68 -99 SPO 1997 04 05 07 06 354 8.3 -9 691.90 -54.4 -54.6 -54.4 68 -99 SPO 1997 04 05 07 07 355 8.7 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 08 356 8.8 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 09 354 8.8 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 10 354 7.9 -9 691.90 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 05 07 11 352 8.5 -9 691.80 -54.2 -54.4 -54.2 68 -99 SPO 1997 04 05 07 12 354 8.6 -9 691.80 -54.2 -54.4 -54.2 69 -99 SPO 1997 04 05 07 13 353 8.6 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 14 353 8.6 -9 691.80 -54.1 -54.3 -54.2 68 -99 SPO 1997 04 05 07 15 353 8.4 -9 691.80 -54.1 -54.3 -54.2 68 -99 SPO 1997 04 05 07 16 351 8.8 -9 691.80 -54.1 -54.4 -54.2 67 -99 SPO 1997 04 05 07 17 352 9.3 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 18 354 8.9 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 19 354 8.8 -9 691.80 -54.1 -54.3 -54.2 67 -99 SPO 1997 04 05 07 20 353 8.5 -9 691.80 -54.0 -54.2 -54.1 67 -99 SPO 1997 04 05 07 21 353 8.7 -9 691.70 -54.0 -54.2 -54.1 67 -99 SPO 1997 04 05 07 22 354 8.7 -9 691.70 -54.0 -54.2 -54.2 68 -99 SPO 1997 04 05 07 23 354 8.6 -9 691.70 -54.0 -54.1 -54.2 69 -99 SPO 1997 04 05 07 24 353 8.9 -9 691.70 -54.0 -54.0 -54.2 69 -99 SPO 1997 04 05 07 25 354 9.1 -9 691.60 -54.0 -54.0 -54.1 69 -99 SPO 1997 04 05 07 26 356 8.4 -9 691.60 -54.0 -54.0 -54.1 69 -99 SPO 1997 04 05 07 27 354 9.2 -9 691.60 -53.9 -54.0 -54.0 68 -99 SPO 1997 04 05 07 28 354 8.9 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 29 354 9.3 -9 691.60 -53.9 -53.8 -54.0 67 -99 SPO 1997 04 05 07 30 355 8.9 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 31 354 9.5 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 32 354 8.6 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 33 354 9.1 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 34 354 8.8 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 35 353 9.5 -9 691.60 -53.9 -53.9 -54.0 69 -99 SPO 1997 04 05 07 36 353 9.4 -9 691.60 -53.9 -53.9 -54.0 69 -99 SPO 1997 04 05 07 37 353 9.2 -9 691.60 -53.9 -53.8 -53.9 68 -99 SPO 1997 04 05 07 38 353 9.2 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 39 354 9.5 -9 691.60 -53.9 -53.9 -54.0 68 -99 SPO 1997 04 05 07 40 353 9.2 -9 691.60 -53.9 -53.9 -53.9 68 -99 SPO 1997 04 05 07 41 352 9.4 -9 691.60 -53.8 -53.8 -53.9 67 -99 SPO 1997 04 05 07 42 353 9.5 -9 691.60 -53.8 -53.8 -53.8 67 -99 SPO 1997 04 05 07 43 353 9.2 -9 691.60 -53.7 -53.7 -53.8 67 -99 SPO 1997 04 05 07 44 353 9.1 -9 691.60 -53.7 -53.7 -53.8 68 -99 SPO 1997 04 05 07 45 354 9.2 -9 691.60 -53.7 -53.6 -53.7 69 -99 SPO 1997 04 05 07 46 354 8.9 -9 691.70 -53.7 -53.6 -53.7 69 -99 SPO 1997 04 05 07 47 355 8.9 -9 691.70 -53.6 -53.5 -53.7 68 -99 SPO 1997 04 05 07 48 354 8.8 -9 691.70 -53.6 -53.5 -53.7 68 -99 SPO 1997 04 05 07 49 354 8.8 -9 691.80 -53.6 -53.6 -53.7 68 -99 SPO 1997 04 05 07 50 353 8.8 -9 691.80 -53.6 -53.8 -53.7 68 -99 SPO 1997 04 05 07 51 353 8.2 -9 691.80 -53.6 -53.8 -53.7 68 -99 SPO 1997 04 05 07 52 352 8.8 -9 691.70 -53.6 -53.8 -53.6 67 -99 SPO 1997 04 05 07 53 353 8.7 -9 691.70 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 05 07 54 353 8.6 -9 691.70 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 05 07 55 354 8.6 -9 691.70 -53.5 -53.7 -53.5 66 -99 SPO 1997 04 05 07 56 354 8.6 -9 691.70 -53.5 -53.6 -53.5 68 -99 SPO 1997 04 05 07 57 354 8.8 -9 691.70 -53.4 -53.6 -53.5 68 -99 SPO 1997 04 05 07 58 354 8.9 -9 691.80 -53.4 -53.5 -53.4 68 -99 SPO 1997 04 05 07 59 353 8.8 -9 691.80 -53.4 -53.5 -53.4 69 -99 SPO 1997 04 05 08 00 352 8.6 -9 691.80 -53.4 -53.5 -53.5 70 0 SPO 1997 04 05 08 01 353 8.5 -9 691.80 -53.4 -53.5 -53.5 70 -99 SPO 1997 04 05 08 02 353 7.8 -9 691.80 -53.4 -53.6 -53.5 69 -99 SPO 1997 04 05 08 03 353 8.2 -9 691.80 -53.4 -53.5 -53.5 69 -99 SPO 1997 04 05 08 04 352 8.7 -9 691.80 -53.4 -53.5 -53.5 69 -99 SPO 1997 04 05 08 05 353 8.7 -9 691.80 -53.4 -53.4 -53.4 68 -99 SPO 1997 04 05 08 06 353 8.5 -9 691.80 -53.3 -53.4 -53.4 67 -99 SPO 1997 04 05 08 07 354 8.6 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 08 353 8.3 -9 691.80 -53.3 -53.6 -53.4 68 -99 SPO 1997 04 05 08 09 353 8.3 -9 691.80 -53.3 -53.6 -53.5 68 -99 SPO 1997 04 05 08 10 354 9.0 -9 691.80 -53.3 -53.6 -53.4 68 -99 SPO 1997 04 05 08 11 353 8.7 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 12 353 8.7 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 13 352 9.0 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 14 351 8.6 -9 691.80 -53.3 -53.4 -53.3 68 -99 SPO 1997 04 05 08 15 352 8.4 -9 691.80 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 05 08 16 352 8.8 -9 691.80 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 05 08 17 352 9.1 -9 691.80 -53.2 -53.3 -53.3 67 -99 SPO 1997 04 05 08 18 352 8.9 -9 691.80 -53.2 -53.3 -53.2 68 -99 SPO 1997 04 05 08 19 353 8.9 -9 691.80 -53.2 -53.2 -53.2 68 -99 SPO 1997 04 05 08 20 352 8.6 -9 691.80 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 21 352 8.4 -9 691.90 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 22 352 8.7 -9 691.90 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 23 352 8.9 -9 691.80 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 24 353 8.4 -9 691.80 -53.1 -53.2 -53.1 68 -99 SPO 1997 04 05 08 25 352 8.6 -9 691.90 -53.0 -53.2 -53.1 68 -99 SPO 1997 04 05 08 26 352 8.3 -9 691.90 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 27 352 8.2 -9 691.90 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 28 351 8.0 -9 692.00 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 29 351 7.9 -9 692.00 -52.9 -53.1 -53.0 68 -99 SPO 1997 04 05 08 30 353 7.7 -9 691.90 -52.9 -53.1 -53.0 68 -99 SPO 1997 04 05 08 31 353 8.0 -9 691.90 -52.9 -53.1 -53.0 69 -99 SPO 1997 04 05 08 32 354 8.2 -9 691.90 -52.9 -53.0 -53.0 69 -99 SPO 1997 04 05 08 33 354 8.4 -9 691.90 -52.8 -53.0 -52.9 69 -99 SPO 1997 04 05 08 34 354 8.0 -9 691.90 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 05 08 35 355 8.4 -9 691.90 -52.8 -52.9 -52.8 69 -99 SPO 1997 04 05 08 36 356 8.0 -9 691.90 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 05 08 37 354 8.6 -9 691.90 -52.8 -52.9 -52.8 69 -99 SPO 1997 04 05 08 38 353 8.6 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 39 355 8.3 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 40 355 8.1 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 41 352 8.1 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 42 353 7.6 -9 691.90 -52.7 -52.9 -52.7 69 -99 SPO 1997 04 05 08 43 354 8.4 -9 691.90 -52.6 -52.9 -52.8 68 -99 SPO 1997 04 05 08 44 354 8.6 -9 691.90 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 05 08 45 354 8.6 -9 691.80 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 05 08 46 355 7.9 -9 691.90 -52.6 -52.9 -52.8 69 -99 SPO 1997 04 05 08 47 355 8.6 -9 691.90 -52.6 -52.9 -52.8 70 -99 SPO 1997 04 05 08 48 355 8.3 -9 691.80 -52.6 -52.8 -52.7 70 -99 SPO 1997 04 05 08 49 356 8.3 -9 691.80 -52.6 -52.6 -52.6 69 -99 SPO 1997 04 05 08 50 357 8.5 -9 691.80 -52.6 -52.5 -52.7 69 -99 SPO 1997 04 05 08 51 356 7.9 -9 691.80 -52.6 -52.5 -52.7 69 -99 SPO 1997 04 05 08 52 355 7.8 -9 691.80 -52.5 -52.5 -52.6 68 -99 SPO 1997 04 05 08 53 353 8.0 -9 691.80 -52.5 -52.5 -52.6 69 -99 SPO 1997 04 05 08 54 351 8.2 -9 691.80 -52.5 -52.4 -52.4 69 -99 SPO 1997 04 05 08 55 352 8.4 -9 691.90 -52.4 -52.4 -52.4 69 -99 SPO 1997 04 05 08 56 352 8.3 -9 691.90 -52.4 -52.3 -52.4 69 -99 SPO 1997 04 05 08 57 350 8.6 -9 691.90 -52.3 -52.3 -52.4 68 -99 SPO 1997 04 05 08 58 354 8.4 -9 691.90 -52.3 -52.3 -52.4 69 -99 SPO 1997 04 05 08 59 354 8.2 -9 691.80 -52.3 -52.4 -52.5 69 -99 SPO 1997 04 05 09 00 355 8.4 -9 691.90 -52.3 -52.5 -52.5 69 0 SPO 1997 04 05 09 01 354 7.9 -9 691.90 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 02 355 7.9 -9 691.90 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 03 353 8.7 -9 691.90 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 05 09 04 354 8.4 -9 691.90 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 05 09 05 356 8.6 -9 691.80 -52.3 -52.4 -52.5 68 -99 SPO 1997 04 05 09 06 353 8.6 -9 691.80 -52.3 -52.5 -52.5 68 -99 SPO 1997 04 05 09 07 353 8.5 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 08 354 8.1 -9 691.80 -52.4 -52.4 -52.5 69 -99 SPO 1997 04 05 09 09 354 8.1 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 10 352 8.4 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 11 352 8.7 -9 691.80 -52.4 -52.4 -52.5 69 -99 SPO 1997 04 05 09 12 352 8.1 -9 691.80 -52.3 -52.4 -52.4 69 -99 SPO 1997 04 05 09 13 352 8.7 -9 691.80 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 05 09 14 351 8.6 -9 691.80 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 05 09 15 352 8.2 -9 691.80 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 05 09 16 352 8.3 -9 691.80 -52.4 -52.5 -52.5 68 -99 SPO 1997 04 05 09 17 352 8.9 -9 691.80 -52.4 -52.6 -52.5 68 -99 SPO 1997 04 05 09 18 351 8.4 -9 691.80 -52.4 -52.6 -52.5 69 -99 SPO 1997 04 05 09 19 350 8.7 -9 691.80 -52.4 -52.6 -52.5 69 -99 SPO 1997 04 05 09 20 350 9.0 -9 691.80 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 05 09 21 350 8.2 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 22 350 8.6 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 23 350 8.1 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 24 351 8.3 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 25 349 8.5 -9 691.80 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 26 350 8.3 -9 691.80 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 27 349 8.7 -9 691.80 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 05 09 28 347 8.4 -9 691.80 -52.2 -52.4 -52.3 66 -99 SPO 1997 04 05 09 29 348 8.8 -9 691.80 -52.2 -52.4 -52.3 67 -99 SPO 1997 04 05 09 30 351 8.3 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 31 350 8.4 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 32 351 8.2 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 33 351 8.2 -9 691.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 34 352 8.2 -9 691.80 -52.2 -52.5 -52.4 68 -99 SPO 1997 04 05 09 35 350 8.3 -9 691.80 -52.2 -52.6 -52.4 69 -99 SPO 1997 04 05 09 36 350 8.7 -9 691.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 37 350 8.2 -9 691.90 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 38 350 8.6 -9 691.90 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 39 351 8.0 -9 691.90 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 40 350 8.2 -9 692.00 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 41 349 8.2 -9 692.00 -52.2 -52.4 -52.3 69 -99 SPO 1997 04 05 09 42 351 8.2 -9 692.00 -52.2 -52.4 -52.3 69 -99 SPO 1997 04 05 09 43 351 7.9 -9 692.00 -52.1 -52.4 -52.3 68 -99 SPO 1997 04 05 09 44 351 8.1 -9 692.00 -52.1 -52.4 -52.2 68 -99 SPO 1997 04 05 09 45 352 8.8 -9 691.90 -52.1 -52.4 -52.2 69 -99 SPO 1997 04 05 09 46 351 8.6 -9 692.00 -52.1 -52.4 -52.2 69 -99 SPO 1997 04 05 09 47 349 8.2 -9 692.00 -52.1 -52.3 -52.2 68 -99 SPO 1997 04 05 09 48 352 8.2 -9 692.00 -52.1 -52.3 -52.2 68 -99 SPO 1997 04 05 09 49 352 8.6 -9 692.00 -52.1 -52.2 -52.1 68 -99 SPO 1997 04 05 09 50 351 8.0 -9 692.00 -52.0 -52.2 -52.1 66 -99 SPO 1997 04 05 09 51 351 8.3 -9 692.00 -52.0 -52.2 -52.0 66 -99 SPO 1997 04 05 09 52 350 8.7 -9 691.90 -52.0 -52.2 -52.0 67 -99 SPO 1997 04 05 09 53 352 9.0 -9 691.90 -52.0 -52.1 -52.0 68 -99 SPO 1997 04 05 09 54 354 8.6 -9 691.90 -51.9 -51.9 -51.9 68 -99 SPO 1997 04 05 09 55 351 9.0 -9 691.90 -51.9 -51.9 -52.0 69 -99 SPO 1997 04 05 09 56 353 8.6 -9 691.90 -51.9 -51.8 -52.0 70 -99 SPO 1997 04 05 09 57 354 8.0 -9 691.90 -51.9 -51.9 -52.0 70 -99 SPO 1997 04 05 09 58 354 8.4 -9 691.90 -51.9 -51.9 -52.0 70 -99 SPO 1997 04 05 09 59 354 8.3 -9 691.90 -51.9 -51.9 -51.9 70 -99 SPO 1997 04 05 10 00 355 8.2 -9 691.90 -51.8 -51.8 -51.8 70 0 SPO 1997 04 05 10 01 352 8.7 -9 691.90 -51.8 -51.8 -51.8 70 -99 SPO 1997 04 05 10 02 354 8.7 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 03 354 8.4 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 04 354 8.8 -9 691.90 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 05 354 7.7 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 06 352 8.4 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 07 353 8.4 -9 692.00 -51.7 -51.9 -51.8 70 -99 SPO 1997 04 05 10 08 354 8.5 -9 692.00 -51.7 -51.9 -51.8 70 -99 SPO 1997 04 05 10 09 354 8.0 -9 691.90 -51.7 -51.9 -51.7 70 -99 SPO 1997 04 05 10 10 351 8.4 -9 692.00 -51.6 -51.9 -51.7 69 -99 SPO 1997 04 05 10 11 351 8.3 -9 692.00 -51.6 -51.9 -51.7 69 -99 SPO 1997 04 05 10 12 352 8.3 -9 692.00 -51.6 -51.8 -51.6 70 -99 SPO 1997 04 05 10 13 353 8.1 -9 692.00 -51.5 -51.8 -51.6 69 -99 SPO 1997 04 05 10 14 353 8.2 -9 692.00 -51.5 -51.8 -51.6 69 -99 SPO 1997 04 05 10 15 354 8.7 -9 692.00 -51.5 -51.9 -51.7 69 -99 SPO 1997 04 05 10 16 353 8.2 -9 692.00 -51.5 -51.9 -51.7 70 -99 SPO 1997 04 05 10 17 353 8.2 -9 692.00 -51.5 -51.9 -51.6 70 -99 SPO 1997 04 05 10 18 353 8.3 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 19 353 8.6 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 20 355 8.7 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 21 354 8.8 -9 691.80 -51.4 -51.8 -51.6 70 -99 SPO 1997 04 05 10 22 353 9.0 -9 691.90 -51.4 -51.7 -51.6 70 -99 SPO 1997 04 05 10 23 353 8.7 -9 691.90 -51.4 -51.7 -51.5 70 -99 SPO 1997 04 05 10 24 354 9.0 -9 691.90 -51.4 -51.6 -51.5 69 -99 SPO 1997 04 05 10 25 354 8.7 -9 691.90 -51.4 -51.7 -51.5 69 -99 SPO 1997 04 05 10 26 355 8.3 -9 691.90 -51.4 -51.6 -51.4 69 -99 SPO 1997 04 05 10 27 356 8.4 -9 691.90 -51.4 -51.6 -51.5 69 -99 SPO 1997 04 05 10 28 354 8.0 -9 691.90 -51.4 -51.5 -51.4 70 -99 SPO 1997 04 05 10 29 356 8.5 -9 691.90 -51.3 -51.6 -51.4 70 -99 SPO 1997 04 05 10 30 354 8.8 -9 691.90 -51.3 -51.6 -51.4 71 -99 SPO 1997 04 05 10 31 354 8.3 -9 691.90 -51.2 -51.6 -51.3 70 -99 SPO 1997 04 05 10 32 353 8.2 -9 692.00 -51.2 -51.4 -51.2 70 -99 SPO 1997 04 05 10 33 352 8.0 -9 692.00 -51.2 -51.4 -51.2 70 -99 SPO 1997 04 05 10 34 354 8.2 -9 692.00 -51.2 -51.4 -51.2 71 -99 SPO 1997 04 05 10 35 353 8.1 -9 692.00 -51.1 -51.4 -51.2 70 -99 SPO 1997 04 05 10 36 354 7.8 -9 692.00 -51.1 -51.4 -51.2 69 -99 SPO 1997 04 05 10 37 354 8.4 -9 692.00 -51.1 -51.3 -51.2 70 -99 SPO 1997 04 05 10 38 352 7.9 -9 692.00 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 10 39 352 8.3 -9 692.00 -51.1 -51.2 -51.1 70 -99 SPO 1997 04 05 10 40 351 8.5 -9 692.00 -51.0 -51.2 -51.1 70 -99 SPO 1997 04 05 10 41 352 8.6 -9 692.00 -51.0 -51.0 -51.0 70 -99 SPO 1997 04 05 10 42 352 8.4 -9 691.90 -51.0 -50.9 -51.0 71 -99 SPO 1997 04 05 10 43 352 8.5 -9 691.90 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 05 10 44 349 8.6 -9 691.90 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 05 10 45 351 8.6 -9 692.00 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 46 350 8.7 -9 691.90 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 47 351 8.2 -9 691.90 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 48 353 8.4 -9 691.90 -51.0 -51.1 -51.1 71 -99 SPO 1997 04 05 10 49 351 8.4 -9 691.90 -51.0 -51.0 -51.0 70 -99 SPO 1997 04 05 10 50 350 8.2 -9 692.00 -51.0 -50.9 -51.0 70 -99 SPO 1997 04 05 10 51 351 8.4 -9 692.00 -50.9 -50.9 -51.1 69 -99 SPO 1997 04 05 10 52 351 8.4 -9 692.00 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 10 53 354 8.4 -9 691.90 -51.0 -51.0 -51.1 70 -99 SPO 1997 04 05 10 54 353 8.7 -9 692.00 -51.0 -51.0 -51.2 70 -99 SPO 1997 04 05 10 55 354 9.0 -9 691.90 -51.0 -50.9 -51.2 70 -99 SPO 1997 04 05 10 56 350 9.1 -9 692.00 -51.0 -50.8 -51.0 70 -99 SPO 1997 04 05 10 57 351 8.4 -9 692.00 -51.0 -50.9 -51.2 70 -99 SPO 1997 04 05 10 58 350 7.7 -9 692.00 -51.1 -51.0 -51.2 71 -99 SPO 1997 04 05 10 59 353 8.0 -9 692.10 -51.1 -51.0 -51.2 71 -99 SPO 1997 04 05 11 00 350 7.5 -9 692.10 -51.1 -51.0 -51.2 70 0 SPO 1997 04 05 11 01 350 7.7 -9 692.10 -51.1 -51.0 -51.2 69 -99 SPO 1997 04 05 11 02 351 8.1 -9 692.00 -51.1 -50.8 -51.1 69 -99 SPO 1997 04 05 11 03 351 7.9 -9 692.10 -51.1 -50.9 -51.2 69 -99 SPO 1997 04 05 11 04 351 8.0 -9 692.00 -51.1 -51.1 -51.3 70 -99 SPO 1997 04 05 11 05 352 8.1 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 06 352 7.8 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 07 352 8.2 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 08 351 8.0 -9 692.00 -51.1 -51.2 -51.3 70 -99 SPO 1997 04 05 11 09 354 8.3 -9 692.00 -51.1 -51.3 -51.4 70 -99 SPO 1997 04 05 11 10 354 8.8 -9 692.00 -51.2 -51.3 -51.3 70 -99 SPO 1997 04 05 11 11 353 8.4 -9 692.00 -51.2 -51.3 -51.3 70 -99 SPO 1997 04 05 11 12 353 8.4 -9 692.00 -51.2 -51.2 -51.2 69 -99 SPO 1997 04 05 11 13 355 8.7 -9 692.00 -51.2 -51.2 -51.2 69 -99 SPO 1997 04 05 11 14 355 8.3 -9 692.00 -51.2 -51.2 -51.3 69 -99 SPO 1997 04 05 11 15 354 8.9 -9 692.00 -51.2 -51.1 -51.3 70 -99 SPO 1997 04 05 11 16 355 8.6 -9 692.00 -51.2 -51.1 -51.3 70 -99 SPO 1997 04 05 11 17 356 8.3 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 18 356 8.7 -9 692.00 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 19 355 8.6 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 20 355 8.1 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 21 354 8.8 -9 692.10 -51.2 -51.1 -51.3 71 -99 SPO 1997 04 05 11 22 354 8.6 -9 692.10 -51.1 -51.1 -51.2 70 -99 SPO 1997 04 05 11 23 355 8.2 -9 692.10 -51.1 -51.2 -51.3 69 -99 SPO 1997 04 05 11 24 354 8.2 -9 692.20 -51.1 -51.2 -51.3 69 -99 SPO 1997 04 05 11 25 354 8.2 -9 692.20 -51.1 -51.3 -51.3 68 -99 SPO 1997 04 05 11 26 354 8.3 -9 692.20 -51.1 -51.3 -51.3 68 -99 SPO 1997 04 05 11 27 354 8.4 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 28 355 8.2 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 29 354 8.7 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 30 353 8.5 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 31 353 8.2 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 32 351 8.2 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 33 354 8.3 -9 692.20 -51.1 -51.1 -51.1 70 -99 SPO 1997 04 05 11 34 349 8.0 -9 692.20 -51.0 -51.1 -51.1 69 -99 SPO 1997 04 05 11 35 355 8.5 -9 692.20 -51.0 -51.0 -51.0 69 -99 SPO 1997 04 05 11 36 351 8.0 -9 692.20 -51.0 -50.9 -50.9 69 -99 SPO 1997 04 05 11 37 351 8.2 -9 692.30 -50.9 -51.0 -51.0 68 -99 SPO 1997 04 05 11 38 354 8.3 -9 692.30 -50.9 -51.0 -51.1 68 -99 SPO 1997 04 05 11 39 354 8.3 -9 692.30 -50.9 -51.0 -51.1 68 -99 SPO 1997 04 05 11 40 353 8.1 -9 692.30 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 11 41 350 8.1 -9 692.40 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 11 42 350 7.7 -9 692.40 -50.9 -51.1 -51.0 70 -99 SPO 1997 04 05 11 43 355 7.9 -9 692.40 -50.8 -51.1 -51.0 69 -99 SPO 1997 04 05 11 44 359 8.2 -9 692.40 -50.9 -51.1 -51.1 71 -99 SPO 1997 04 05 11 45 353 8.3 -9 692.40 -50.9 -51.1 -51.1 70 -99 SPO 1997 04 05 11 46 353 8.0 -9 692.40 -50.9 -51.1 -51.0 70 -99 SPO 1997 04 05 11 47 349 7.6 -9 692.40 -50.9 -51.0 -51.0 69 -99 SPO 1997 04 05 11 48 350 7.9 -9 692.40 -50.9 -51.0 -50.9 69 -99 SPO 1997 04 05 11 49 356 8.4 -9 692.40 -50.8 -50.9 -50.9 68 -99 SPO 1997 04 05 11 50 356 8.0 -9 692.40 -50.8 -50.7 -50.9 68 -99 SPO 1997 04 05 11 51 354 7.8 -9 692.40 -50.8 -50.7 -50.9 68 -99 SPO 1997 04 05 11 52 352 8.1 -9 692.40 -50.8 -50.8 -50.9 69 -99 SPO 1997 04 05 11 53 355 8.0 -9 692.40 -50.8 -50.9 -50.9 69 -99 SPO 1997 04 05 11 54 354 8.1 -9 692.40 -50.8 -50.9 -50.9 70 -99 SPO 1997 04 05 11 55 354 8.0 -9 692.50 -50.8 -50.9 -50.9 70 -99 SPO 1997 04 05 11 56 352 8.2 -9 692.40 -50.8 -50.8 -50.8 70 -99 SPO 1997 04 05 11 57 351 8.4 -9 692.40 -50.8 -50.9 -50.8 70 -99 SPO 1997 04 05 11 58 354 8.4 -9 692.30 -50.7 -50.9 -50.9 69 -99 SPO 1997 04 05 11 59 355 8.6 -9 692.30 -50.7 -51.0 -50.8 69 -99 SPO 1997 04 05 12 00 354 8.9 -9 692.30 -50.7 -51.0 -50.8 70 0 SPO 1997 04 05 12 01 358 8.6 -9 692.30 -50.7 -51.0 -50.8 70 -99 SPO 1997 04 05 12 02 355 9.2 -9 692.30 -50.8 -51.0 -50.9 71 -99 SPO 1997 04 05 12 03 356 8.9 -9 692.30 -50.8 -51.0 -50.9 71 -99 SPO 1997 04 05 12 04 354 8.8 -9 692.30 -50.7 -51.0 -50.8 70 -99 SPO 1997 04 05 12 05 356 8.9 -9 692.20 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 06 356 8.6 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 07 356 8.7 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 08 356 9.1 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 09 356 9.3 -9 692.10 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 10 356 9.8 -9 692.10 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 11 356 9.4 -9 692.00 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 12 359 9.6 -9 692.00 -50.7 -50.8 -50.8 70 -99 SPO 1997 04 05 12 13 358 9.8 -9 691.90 -50.6 -50.8 -50.8 69 -99 SPO 1997 04 05 12 14 358 10.0 -9 691.80 -50.6 -50.8 -50.8 69 -99 SPO 1997 04 05 12 15 356 9.7 -9 691.80 -50.6 -50.8 -50.7 69 -99 SPO 1997 04 05 12 16 358 9.9 -9 691.80 -50.6 -50.8 -50.7 70 -99 SPO 1997 04 05 12 17 356 9.9 -9 691.80 -50.6 -50.8 -50.8 70 -99 SPO 1997 04 05 12 18 354 9.6 -9 691.90 -50.6 -50.9 -50.7 71 -99 SPO 1997 04 05 12 19 356 10.4 -9 691.90 -50.5 -50.9 -50.7 70 -99 SPO 1997 04 05 12 20 354 10.0 -9 691.80 -50.6 -50.8 -50.7 71 -99 SPO 1997 04 05 12 21 352 9.6 -9 691.90 -50.6 -50.8 -50.7 71 -99 SPO 1997 04 05 12 22 351 9.6 -9 691.80 -50.6 -50.8 -50.6 71 -99 SPO 1997 04 05 12 23 351 9.9 -9 691.80 -50.5 -50.7 -50.6 70 -99 SPO 1997 04 05 12 24 350 9.7 -9 691.80 -50.5 -50.6 -50.5 70 -99 SPO 1997 04 05 12 25 351 10.0 -9 691.80 -50.5 -50.6 -50.5 70 -99 SPO 1997 04 05 12 26 354 10.2 -9 691.70 -50.4 -50.6 -50.5 69 -99 SPO 1997 04 05 12 27 350 9.8 -9 691.70 -50.4 -50.6 -50.5 69 -99 SPO 1997 04 05 12 28 353 9.9 -9 691.80 -50.4 -50.6 -50.5 70 -99 SPO 1997 04 05 12 29 348 9.6 -9 691.80 -50.4 -50.5 -50.5 70 -99 SPO 1997 04 05 12 30 349 9.6 -9 691.80 -50.4 -50.5 -50.5 70 -99 SPO 1997 04 05 12 31 347 9.3 -9 691.90 -50.4 -50.4 -50.5 71 -99 SPO 1997 04 05 12 32 346 9.3 -9 691.90 -50.4 -50.4 -50.4 70 -99 SPO 1997 04 05 12 33 349 9.4 -9 691.90 -50.3 -50.4 -50.4 69 -99 SPO 1997 04 05 12 34 349 9.7 -9 691.90 -50.3 -50.4 -50.4 68 -99 SPO 1997 04 05 12 35 348 9.3 -9 692.00 -50.3 -50.5 -50.4 69 -99 SPO 1997 04 05 12 36 346 8.9 -9 692.00 -50.3 -50.5 -50.4 69 -99 SPO 1997 04 05 12 37 349 8.8 -9 692.00 -50.3 -50.6 -50.4 69 -99 SPO 1997 04 05 12 38 346 9.1 -9 692.00 -50.3 -50.6 -50.4 70 -99 SPO 1997 04 05 12 39 347 8.7 -9 692.00 -50.3 -50.5 -50.4 71 -99 SPO 1997 04 05 12 40 346 8.8 -9 692.00 -50.3 -50.4 -50.4 71 -99 SPO 1997 04 05 12 41 347 8.7 -9 692.00 -50.3 -50.5 -50.3 72 -99 SPO 1997 04 05 12 42 347 9.3 -9 692.00 -50.2 -50.4 -50.3 71 -99 SPO 1997 04 05 12 43 345 8.5 -9 692.00 -50.2 -50.3 -50.3 72 -99 SPO 1997 04 05 12 44 346 9.1 -9 692.00 -50.2 -50.2 -50.3 72 -99 SPO 1997 04 05 12 45 344 9.0 -9 692.00 -50.2 -50.0 -50.2 71 -99 SPO 1997 04 05 12 46 346 9.2 -9 692.00 -50.2 -50.1 -50.2 70 -99 SPO 1997 04 05 12 47 345 9.9 -9 692.00 -50.1 -50.0 -50.2 69 -99 SPO 1997 04 05 12 48 346 9.7 -9 691.90 -50.1 -49.9 -50.1 69 -99 SPO 1997 04 05 12 49 346 9.7 -9 691.90 -50.0 -49.8 -50.0 68 -99 SPO 1997 04 05 12 50 346 9.2 -9 691.90 -50.0 -49.8 -49.9 69 -99 SPO 1997 04 05 12 51 346 9.4 -9 691.90 -49.9 -49.8 -50.1 68 -99 SPO 1997 04 05 12 52 345 9.4 -9 691.90 -49.9 -49.8 -49.9 69 -99 SPO 1997 04 05 12 53 347 9.3 -9 691.90 -49.8 -49.8 -50.0 68 -99 SPO 1997 04 05 12 54 345 9.4 -9 691.90 -49.9 -49.9 -50.0 70 -99 SPO 1997 04 05 12 55 346 9.2 -9 691.90 -49.9 -49.9 -50.0 71 -99 SPO 1997 04 05 12 56 345 8.6 -9 691.90 -50.0 -50.0 -50.1 72 -99 SPO 1997 04 05 12 57 347 8.3 -9 691.90 -50.0 -49.9 -50.1 72 -99 SPO 1997 04 05 12 58 346 8.4 -9 691.90 -50.0 -49.9 -50.1 71 -99 SPO 1997 04 05 12 59 347 8.7 -9 691.90 -50.0 -49.8 -50.0 71 -99 SPO 1997 04 05 13 00 345 9.4 -9 691.90 -50.0 -49.7 -50.0 70 0 SPO 1997 04 05 13 01 348 8.8 -9 691.90 -50.0 -49.8 -50.0 70 -99 SPO 1997 04 05 13 02 346 9.6 -9 691.90 -49.9 -49.7 -49.9 70 -99 SPO 1997 04 05 13 03 346 9.2 -9 691.90 -49.8 -49.5 -49.8 70 -99 SPO 1997 04 05 13 04 344 9.2 -9 691.90 -49.8 -49.6 -49.9 71 -99 SPO 1997 04 05 13 05 343 9.2 -9 691.90 -49.8 -49.4 -49.8 71 -99 SPO 1997 04 05 13 06 345 9.6 -9 691.90 -49.7 -49.4 -49.6 71 -99 SPO 1997 04 05 13 07 346 9.1 -9 691.90 -49.6 -49.6 -49.8 70 -99 SPO 1997 04 05 13 08 347 8.8 -9 691.80 -49.7 -49.7 -49.9 71 -99 SPO 1997 04 05 13 09 348 8.8 -9 691.90 -49.7 -49.8 -49.9 71 -99 SPO 1997 04 05 13 10 348 8.5 -9 691.90 -49.7 -49.7 -49.8 69 -99 SPO 1997 04 05 13 11 345 8.8 -9 691.90 -49.7 -49.7 -49.8 69 -99 SPO 1997 04 05 13 12 344 8.5 -9 692.00 -49.7 -49.7 -49.7 69 -99 SPO 1997 04 05 13 13 343 8.5 -9 692.00 -49.6 -49.6 -49.6 69 -99 SPO 1997 04 05 13 14 343 8.6 -9 692.00 -49.6 -49.5 -49.5 69 -99 SPO 1997 04 05 13 15 343 8.6 -9 692.00 -49.5 -49.4 -49.5 69 -99 SPO 1997 04 05 13 16 341 9.0 -9 692.00 -49.4 -49.2 -49.3 69 -99 SPO 1997 04 05 13 17 342 8.8 -9 692.00 -49.3 -49.1 -49.0 71 -99 SPO 1997 04 05 13 18 344 8.6 -9 692.00 -49.2 -49.1 -49.2 71 -99 SPO 1997 04 05 13 19 343 8.7 -9 692.00 -49.2 -49.1 -49.3 72 -99 SPO 1997 04 05 13 20 345 8.4 -9 692.00 -49.2 -49.1 -49.2 73 -99 SPO 1997 04 05 13 21 346 8.2 -9 692.00 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 05 13 22 346 8.3 -9 692.10 -49.2 -49.3 -49.4 72 -99 SPO 1997 04 05 13 23 346 8.3 -9 692.10 -49.3 -49.3 -49.4 73 -99 SPO 1997 04 05 13 24 347 8.2 -9 692.00 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 25 346 8.2 -9 692.00 -49.2 -49.2 -49.4 70 -99 SPO 1997 04 05 13 26 347 8.6 -9 692.00 -49.2 -49.2 -49.4 70 -99 SPO 1997 04 05 13 27 347 8.2 -9 692.00 -49.2 -49.3 -49.4 70 -99 SPO 1997 04 05 13 28 346 8.2 -9 692.00 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 29 346 8.5 -9 692.00 -49.3 -49.2 -49.4 72 -99 SPO 1997 04 05 13 30 346 8.4 -9 692.10 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 31 346 8.3 -9 692.10 -49.3 -49.3 -49.4 73 -99 SPO 1997 04 05 13 32 347 8.1 -9 692.10 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 33 346 8.6 -9 692.10 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 34 348 8.4 -9 692.00 -49.3 -49.4 -49.3 73 -99 SPO 1997 04 05 13 35 347 8.6 -9 692.00 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 05 13 36 347 8.6 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 37 346 8.8 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 38 347 8.8 -9 691.90 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 39 348 8.8 -9 691.90 -49.1 -49.2 -49.2 71 -99 SPO 1997 04 05 13 40 350 8.7 -9 691.90 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 05 13 41 351 8.7 -9 691.90 -49.2 -49.3 -49.4 72 -99 SPO 1997 04 05 13 42 350 8.1 -9 692.00 -49.2 -49.4 -49.4 73 -99 SPO 1997 04 05 13 43 350 8.5 -9 692.00 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 44 350 8.5 -9 692.00 -49.2 -49.4 -49.4 73 -99 SPO 1997 04 05 13 45 348 8.4 -9 692.00 -49.2 -49.4 -49.4 72 -99 SPO 1997 04 05 13 46 349 8.3 -9 691.90 -49.2 -49.3 -49.4 71 -99 SPO 1997 04 05 13 47 348 7.7 -9 692.00 -49.2 -49.2 -49.3 71 -99 SPO 1997 04 05 13 48 348 7.9 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 49 349 8.1 -9 692.10 -49.2 -49.1 -49.2 70 -99 SPO 1997 04 05 13 50 349 8.2 -9 692.10 -49.2 -49.1 -49.2 70 -99 SPO 1997 04 05 13 51 347 8.1 -9 692.10 -49.1 -49.0 -49.1 70 -99 SPO 1997 04 05 13 52 346 8.4 -9 692.10 -49.0 -49.0 -49.0 70 -99 SPO 1997 04 05 13 53 347 8.6 -9 692.10 -49.0 -48.9 -49.0 71 -99 SPO 1997 04 05 13 54 348 8.6 -9 692.10 -48.9 -48.9 -49.0 71 -99 SPO 1997 04 05 13 55 348 7.9 -9 692.20 -48.9 -49.0 -49.0 71 -99 SPO 1997 04 05 13 56 348 8.4 -9 692.20 -49.0 -49.0 -49.1 73 -99 SPO 1997 04 05 13 57 348 7.8 -9 692.20 -49.0 -49.1 -49.2 73 -99 SPO 1997 04 05 13 58 347 7.9 -9 692.20 -49.0 -49.1 -49.2 72 -99 SPO 1997 04 05 13 59 346 8.1 -9 692.20 -49.0 -49.1 -49.2 71 -99 SPO 1997 04 05 14 00 345 7.7 -9 692.20 -49.0 -49.0 -49.0 71 0 SPO 1997 04 05 14 01 345 8.1 -9 692.20 -49.0 -48.8 -48.9 70 -99 SPO 1997 04 05 14 02 344 8.3 -9 692.20 -48.9 -48.6 -48.7 70 -99 SPO 1997 04 05 14 03 343 8.7 -9 692.20 -48.8 -48.4 -48.5 71 -99 SPO 1997 04 05 14 04 343 9.1 -9 692.20 -48.6 -48.3 -48.3 71 -99 SPO 1997 04 05 14 05 342 8.8 -9 692.20 -48.4 -48.3 -48.3 71 -99 SPO 1997 04 05 14 06 345 8.6 -9 692.30 -48.4 -48.3 -48.3 72 -99 SPO 1997 04 05 14 07 347 8.6 -9 692.30 -48.3 -48.3 -48.3 72 -99 SPO 1997 04 05 14 08 347 8.5 -9 692.20 -48.3 -48.3 -48.4 72 -99 SPO 1997 04 05 14 09 346 8.8 -9 692.20 -48.3 -48.3 -48.3 72 -99 SPO 1997 04 05 14 10 344 8.7 -9 692.20 -48.2 -48.3 -48.2 71 -99 SPO 1997 04 05 14 11 345 8.7 -9 692.20 -48.2 -48.2 -48.2 71 -99 SPO 1997 04 05 14 12 345 8.7 -9 692.20 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 13 346 9.1 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 14 345 9.1 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 15 346 8.9 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 16 347 9.2 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 17 346 8.9 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 18 345 9.2 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 19 347 9.3 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 20 344 9.1 -9 692.10 -48.1 -48.2 -48.2 73 -99 SPO 1997 04 05 14 21 340 9.1 -9 692.10 -48.1 -48.1 -48.1 74 -99 SPO 1997 04 05 14 22 343 9.5 -9 692.10 -48.0 -48.0 -48.0 72 -99 SPO 1997 04 05 14 23 348 9.0 -9 692.10 -48.0 -47.9 -47.9 72 -99 SPO 1997 04 05 14 24 345 8.7 -9 692.20 -47.9 -47.9 -48.1 71 -99 SPO 1997 04 05 14 25 343 8.4 -9 692.20 -48.0 -48.0 -48.1 72 -99 SPO 1997 04 05 14 26 345 8.5 -9 692.30 -48.0 -48.1 -48.1 71 -99 SPO 1997 04 05 14 27 343 8.4 -9 692.30 -48.0 -48.1 -48.1 71 -99 SPO 1997 04 05 14 28 346 8.5 -9 692.30 -48.0 -48.1 -48.1 72 -99 SPO 1997 04 05 14 29 349 8.5 -9 692.30 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 30 343 8.7 -9 692.30 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 31 344 8.3 -9 692.40 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 32 347 8.0 -9 692.30 -48.0 -48.2 -48.0 72 -99 SPO 1997 04 05 14 33 348 8.3 -9 692.30 -48.0 -48.1 -48.0 73 -99 SPO 1997 04 05 14 34 345 8.2 -9 692.30 -47.9 -48.1 -48.0 71 -99 SPO 1997 04 05 14 35 344 7.8 -9 692.30 -47.9 -48.0 -48.0 71 -99 SPO 1997 04 05 14 36 345 8.1 -9 692.30 -47.9 -48.0 -47.9 71 -99 SPO 1997 04 05 14 37 343 7.9 -9 692.30 -47.9 -47.9 -47.9 71 -99 SPO 1997 04 05 14 38 342 8.5 -9 692.30 -47.8 -47.7 -47.8 70 -99 SPO 1997 04 05 14 39 341 8.6 -9 692.30 -47.7 -47.6 -47.6 71 -99 SPO 1997 04 05 14 40 346 8.5 -9 692.30 -47.6 -47.6 -47.6 71 -99 SPO 1997 04 05 14 41 345 8.5 -9 692.20 -47.6 -47.7 -47.8 71 -99 SPO 1997 04 05 14 42 342 9.8 -9 692.20 -47.7 -47.6 -47.7 73 -99 SPO 1997 04 05 14 43 345 8.6 -9 692.20 -47.6 -47.5 -47.6 73 -99 SPO 1997 04 05 14 44 348 8.3 -9 692.20 -47.6 -47.6 -47.8 73 -99 SPO 1997 04 05 14 45 351 8.4 -9 692.20 -47.6 -47.8 -47.8 73 -99 SPO 1997 04 05 14 46 347 8.0 -9 692.30 -47.7 -47.8 -47.8 74 -99 SPO 1997 04 05 14 47 346 7.9 -9 692.30 -47.7 -47.8 -47.8 72 -99 SPO 1997 04 05 14 48 346 8.0 -9 692.30 -47.7 -47.8 -47.8 71 -99 SPO 1997 04 05 14 49 343 7.9 -9 692.30 -47.7 -47.8 -47.7 71 -99 SPO 1997 04 05 14 50 344 8.0 -9 692.30 -47.7 -47.8 -47.7 70 -99 SPO 1997 04 05 14 51 343 8.3 -9 692.20 -47.6 -47.7 -47.6 70 -99 SPO 1997 04 05 14 52 343 7.9 -9 692.20 -47.6 -47.7 -47.6 70 -99 SPO 1997 04 05 14 53 343 7.9 -9 692.30 -47.6 -47.6 -47.6 71 -99 SPO 1997 04 05 14 54 341 7.9 -9 692.30 -47.6 -47.6 -47.5 71 -99 SPO 1997 04 05 14 55 341 8.1 -9 692.30 -47.5 -47.5 -47.4 72 -99 SPO 1997 04 05 14 56 341 8.0 -9 692.30 -47.4 -47.4 -47.4 71 -99 SPO 1997 04 05 14 57 342 8.2 -9 692.30 -47.4 -47.4 -47.4 72 -99 SPO 1997 04 05 14 58 345 7.8 -9 692.20 -47.3 -47.4 -47.3 71 -99 SPO 1997 04 05 14 59 343 7.9 -9 692.20 -47.3 -47.3 -47.3 71 -99 SPO 1997 04 05 15 00 344 8.0 -9 692.20 -47.2 -47.3 -47.3 70 0 SPO 1997 04 05 15 01 344 8.3 -9 692.20 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 02 342 8.7 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 03 343 8.2 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 04 344 8.2 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 05 344 8.5 -9 692.20 -47.2 -47.2 -47.3 71 -99 SPO 1997 04 05 15 06 342 8.7 -9 692.20 -47.2 -47.3 -47.2 71 -99 SPO 1997 04 05 15 07 347 8.4 -9 692.20 -47.2 -47.3 -47.2 71 -99 SPO 1997 04 05 15 08 341 8.3 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 09 341 8.8 -9 692.30 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 10 344 8.3 -9 692.20 -47.1 -47.3 -47.2 74 -99 SPO 1997 04 05 15 11 342 8.0 -9 692.20 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 12 341 8.3 -9 692.20 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 13 341 8.2 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 14 341 8.1 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 15 340 7.8 -9 692.30 -47.1 -47.2 -47.2 71 -99 SPO 1997 04 05 15 16 341 8.2 -9 692.30 -47.1 -47.2 -47.1 71 -99 SPO 1997 04 05 15 17 340 8.1 -9 692.30 -47.1 -47.1 -47.1 73 -99 SPO 1997 04 05 15 18 341 8.6 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 19 344 8.4 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 20 340 8.4 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 21 337 8.6 -9 692.30 -47.0 -47.1 -47.1 74 -99 SPO 1997 04 05 15 22 342 8.2 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 23 341 8.0 -9 692.30 -47.0 -47.1 -47.0 73 -99 SPO 1997 04 05 15 24 340 8.3 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 25 340 8.7 -9 692.30 -47.0 -47.0 -47.0 72 -99 SPO 1997 04 05 15 26 342 8.5 -9 692.30 -47.0 -47.0 -47.1 72 -99 SPO 1997 04 05 15 27 340 9.0 -9 692.30 -47.0 -47.0 -47.0 72 -99 SPO 1997 04 05 15 28 341 8.3 -9 692.40 -47.0 -47.1 -47.0 72 -99 SPO 1997 04 05 15 29 335 8.5 -9 692.40 -47.0 -47.1 -47.1 72 -99 SPO 1997 04 05 15 30 334 8.7 -9 692.40 -47.0 -47.0 -46.9 73 -99 SPO 1997 04 05 15 31 341 8.6 -9 692.30 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 32 339 7.7 -9 692.40 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 33 341 8.3 -9 692.40 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 34 341 8.5 -9 692.30 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 35 339 8.1 -9 692.40 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 36 340 7.9 -9 692.40 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 37 339 7.9 -9 692.40 -46.9 -47.0 -46.9 73 -99 SPO 1997 04 05 15 38 338 8.3 -9 692.40 -46.8 -46.9 -46.9 72 -99 SPO 1997 04 05 15 39 339 8.7 -9 692.30 -46.8 -46.9 -46.9 72 -99 SPO 1997 04 05 15 40 342 8.8 -9 692.30 -46.8 -46.8 -46.8 72 -99 SPO 1997 04 05 15 41 340 8.9 -9 692.30 -46.8 -46.8 -46.8 72 -99 SPO 1997 04 05 15 42 339 9.2 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 43 339 9.1 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 44 340 8.6 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 45 340 8.7 -9 692.30 -46.7 -46.7 -46.8 72 -99 SPO 1997 04 05 15 46 338 9.0 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 47 338 9.3 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 48 340 9.4 -9 692.30 -46.7 -46.8 -46.7 73 -99 SPO 1997 04 05 15 49 343 8.8 -9 692.30 -46.7 -46.8 -46.7 73 -99 SPO 1997 04 05 15 50 340 8.9 -9 692.30 -46.7 -46.8 -46.7 72 -99 SPO 1997 04 05 15 51 340 8.9 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 52 340 8.8 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 53 336 8.7 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 54 340 9.3 -9 692.30 -46.7 -46.7 -46.7 72 -99 SPO 1997 04 05 15 55 337 9.4 -9 692.30 -46.6 -46.6 -46.7 72 -99 SPO 1997 04 05 15 56 337 9.5 -9 692.30 -46.6 -46.4 -46.5 73 -99 SPO 1997 04 05 15 57 341 10.8 -9 692.20 -46.5 -46.3 -46.3 73 -99 SPO 1997 04 05 15 58 336 9.9 -9 692.20 -46.4 -46.3 -46.4 73 -99 SPO 1997 04 05 15 59 338 9.2 -9 692.30 -46.4 -46.4 -46.5 74 -99 SPO 1997 04 05 16 00 338 8.9 -9 692.30 -46.4 -46.4 -46.6 74 0 SPO 1997 04 05 16 01 335 8.8 -9 692.30 -46.4 -46.4 -46.5 74 -99 SPO 1997 04 05 16 02 335 8.6 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 03 333 9.2 -9 692.30 -46.4 -46.5 -46.5 72 -99 SPO 1997 04 05 16 04 338 9.4 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 05 339 9.2 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 06 338 9.4 -9 692.20 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 07 336 9.8 -9 692.20 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 08 336 9.7 -9 692.30 -46.4 -46.4 -46.4 72 -99 SPO 1997 04 05 16 09 335 10.3 -9 692.30 -46.4 -46.4 -46.3 74 -99 SPO 1997 04 05 16 10 335 10.0 -9 692.30 -46.3 -46.3 -46.3 73 -99 SPO 1997 04 05 16 11 337 9.8 -9 692.30 -46.3 -46.3 -46.2 73 -99 SPO 1997 04 05 16 12 336 9.4 -9 692.30 -46.2 -46.4 -46.4 73 -99 SPO 1997 04 05 16 13 339 9.4 -9 692.30 -46.3 -46.4 -46.4 75 -99 SPO 1997 04 05 16 14 337 9.4 -9 692.20 -46.3 -46.4 -46.4 74 -99 SPO 1997 04 05 16 15 335 9.6 -9 692.30 -46.3 -46.4 -46.4 73 -99 SPO 1997 04 05 16 16 336 9.5 -9 692.30 -46.3 -46.3 -46.3 73 -99 SPO 1997 04 05 16 17 339 9.3 -9 692.30 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 18 339 9.8 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 19 337 9.6 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 20 339 9.7 -9 692.20 -46.2 -46.3 -46.3 73 -99 SPO 1997 04 05 16 21 339 10.0 -9 692.20 -46.2 -46.2 -46.3 73 -99 SPO 1997 04 05 16 22 337 9.9 -9 692.20 -46.2 -46.2 -46.3 73 -99 SPO 1997 04 05 16 23 339 9.9 -9 692.20 -46.2 -46.1 -46.3 74 -99 SPO 1997 04 05 16 24 339 9.8 -9 692.20 -46.2 -46.2 -46.3 74 -99 SPO 1997 04 05 16 25 343 10.1 -9 692.10 -46.2 -46.1 -46.3 74 -99 SPO 1997 04 05 16 26 343 9.9 -9 692.10 -46.2 -46.1 -46.3 72 -99 SPO 1997 04 05 16 27 343 9.8 -9 692.10 -46.2 -46.2 -46.3 72 -99 SPO 1997 04 05 16 28 336 9.8 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 29 332 10.1 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 30 343 9.4 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 31 339 9.4 -9 692.20 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 32 337 9.2 -9 692.30 -46.2 -46.3 -46.3 74 -99 SPO 1997 04 05 16 33 335 9.9 -9 692.30 -46.2 -46.3 -46.3 75 -99 SPO 1997 04 05 16 34 345 9.4 -9 692.20 -46.2 -46.2 -46.3 75 -99 SPO 1997 04 05 16 35 337 9.8 -9 692.20 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 36 334 9.4 -9 692.30 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 37 339 9.7 -9 692.20 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 38 341 9.2 -9 692.30 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 39 335 9.3 -9 692.30 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 40 335 9.4 -9 692.30 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 41 337 9.5 -9 692.30 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 42 337 9.8 -9 692.30 -46.1 -46.2 -46.2 71 -99 SPO 1997 04 05 16 43 339 9.5 -9 692.20 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 44 333 9.7 -9 692.30 -46.1 -46.1 -46.2 72 -99 SPO 1997 04 05 16 45 336 9.6 -9 692.30 -46.1 -46.1 -46.2 73 -99 SPO 1997 04 05 16 46 336 9.7 -9 692.30 -46.1 -46.1 -46.2 73 -99 SPO 1997 04 05 16 47 335 10.4 -9 692.20 -46.1 -46.0 -46.1 73 -99 SPO 1997 04 05 16 48 334 10.2 -9 692.20 -46.0 -46.0 -45.9 73 -99 SPO 1997 04 05 16 49 337 10.0 -9 692.20 -46.0 -46.0 -46.0 74 -99 SPO 1997 04 05 16 50 336 10.1 -9 692.20 -46.0 -46.0 -46.1 74 -99 SPO 1997 04 05 16 51 336 10.4 -9 692.20 -46.0 -46.0 -46.0 73 -99 SPO 1997 04 05 16 52 336 9.8 -9 692.20 -45.9 -46.0 -45.9 73 -99 SPO 1997 04 05 16 53 335 10.0 -9 692.10 -45.9 -46.0 -45.9 73 -99 SPO 1997 04 05 16 54 334 9.7 -9 692.20 -45.9 -46.0 -46.0 73 -99 SPO 1997 04 05 16 55 335 9.8 -9 692.20 -45.9 -46.0 -46.1 73 -99 SPO 1997 04 05 16 56 338 9.7 -9 692.10 -45.9 -46.0 -46.0 73 -99 SPO 1997 04 05 16 57 341 9.7 -9 692.10 -45.9 -45.8 -46.0 73 -99 SPO 1997 04 05 16 58 337 9.5 -9 692.10 -45.9 -45.8 -46.0 74 -99 SPO 1997 04 05 16 59 336 10.2 -9 692.10 -45.9 -45.8 -46.0 75 -99 SPO 1997 04 05 17 00 336 10.0 -9 692.10 -45.9 -45.9 -45.9 75 0 SPO 1997 04 05 17 01 337 10.3 -9 692.00 -45.8 -45.8 -45.9 74 -99 SPO 1997 04 05 17 02 340 10.0 -9 692.00 -45.8 -45.7 -45.9 74 -99 SPO 1997 04 05 17 03 335 9.6 -9 692.00 -45.8 -45.8 -46.0 74 -99 SPO 1997 04 05 17 04 337 9.7 -9 692.10 -45.8 -45.8 -46.0 73 -99 SPO 1997 04 05 17 05 338 10.3 -9 692.00 -45.8 -45.8 -45.9 73 -99 SPO 1997 04 05 17 06 336 10.4 -9 692.00 -45.8 -45.7 -45.8 72 -99 SPO 1997 04 05 17 07 336 9.9 -9 692.00 -45.8 -45.7 -45.8 72 -99 SPO 1997 04 05 17 08 334 10.5 -9 692.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 09 334 10.4 -9 692.10 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 10 337 9.5 -9 692.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 11 335 10.2 -9 692.00 -45.7 -45.7 -45.7 74 -99 SPO 1997 04 05 17 12 334 10.0 -9 692.10 -45.6 -45.7 -45.7 73 -99 SPO 1997 04 05 17 13 336 9.9 -9 692.10 -45.6 -45.7 -45.8 74 -99 SPO 1997 04 05 17 14 335 9.8 -9 692.10 -45.7 -45.7 -45.7 75 -99 SPO 1997 04 05 17 15 334 10.4 -9 692.10 -45.6 -45.6 -45.7 74 -99 SPO 1997 04 05 17 16 338 9.5 -9 692.10 -45.6 -45.6 -45.7 73 -99 SPO 1997 04 05 17 17 335 9.4 -9 692.20 -45.6 -45.5 -45.6 73 -99 SPO 1997 04 05 17 18 332 9.8 -9 692.20 -45.5 -45.5 -45.6 72 -99 SPO 1997 04 05 17 19 338 10.0 -9 692.20 -45.5 -45.4 -45.6 71 -99 SPO 1997 04 05 17 20 335 10.1 -9 692.20 -45.5 -45.2 -45.5 72 -99 SPO 1997 04 05 17 21 333 9.8 -9 692.20 -45.5 -45.4 -45.6 73 -99 SPO 1997 04 05 17 22 335 10.0 -9 692.20 -45.5 -45.4 -45.6 73 -99 SPO 1997 04 05 17 23 334 10.0 -9 692.10 -45.5 -45.4 -45.5 74 -99 SPO 1997 04 05 17 24 335 10.2 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 25 334 10.3 -9 692.20 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 26 335 10.2 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 27 334 10.4 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 28 334 10.5 -9 692.10 -45.4 -45.4 -45.4 73 -99 SPO 1997 04 05 17 29 332 9.8 -9 692.10 -45.4 -45.4 -45.4 73 -99 SPO 1997 04 05 17 30 335 10.0 -9 692.10 -45.3 -45.4 -45.4 71 -99 SPO 1997 04 05 17 31 334 10.2 -9 692.10 -45.3 -45.4 -45.4 71 -99 SPO 1997 04 05 17 32 332 11.0 -9 692.00 -45.3 -45.4 -45.3 71 -99 SPO 1997 04 05 17 33 333 10.3 -9 692.10 -45.3 -45.4 -45.4 72 -99 SPO 1997 04 05 17 34 332 10.2 -9 692.10 -45.3 -45.4 -45.4 73 -99 SPO 1997 04 05 17 35 332 10.1 -9 692.00 -45.3 -45.3 -45.3 73 -99 SPO 1997 04 05 17 36 331 10.5 -9 692.00 -45.3 -45.3 -45.3 74 -99 SPO 1997 04 05 17 37 332 10.0 -9 692.10 -45.2 -45.2 -45.2 73 -99 SPO 1997 04 05 17 38 330 10.6 -9 692.00 -45.2 -45.2 -45.1 73 -99 SPO 1997 04 05 17 39 332 10.3 -9 692.00 -45.1 -45.0 -45.0 74 -99 SPO 1997 04 05 17 40 333 10.2 -9 692.00 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 17 41 331 10.8 -9 692.00 -45.0 -44.9 -45.0 73 -99 SPO 1997 04 05 17 42 334 11.3 -9 692.00 -44.9 -44.8 -44.9 72 -99 SPO 1997 04 05 17 43 334 10.4 -9 692.00 -44.9 -44.8 -44.9 72 -99 SPO 1997 04 05 17 44 332 10.1 -9 692.10 -44.9 -44.9 -45.1 72 -99 SPO 1997 04 05 17 45 332 10.9 -9 692.10 -45.0 -44.9 -45.2 73 -99 SPO 1997 04 05 17 46 331 10.7 -9 692.10 -45.0 -44.9 -45.1 73 -99 SPO 1997 04 05 17 47 332 10.4 -9 692.10 -45.0 -45.0 -45.1 74 -99 SPO 1997 04 05 17 48 332 10.2 -9 692.20 -45.0 -45.0 -45.1 75 -99 SPO 1997 04 05 17 49 332 10.1 -9 692.10 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 17 50 331 10.0 -9 692.10 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 17 51 332 10.3 -9 692.10 -45.0 -45.1 -45.1 76 -99 SPO 1997 04 05 17 52 331 10.2 -9 692.10 -45.0 -45.2 -45.2 76 -99 SPO 1997 04 05 17 53 331 10.5 -9 692.20 -45.0 -45.2 -45.2 75 -99 SPO 1997 04 05 17 54 333 10.4 -9 692.10 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 17 55 330 10.0 -9 692.10 -45.1 -45.1 -45.2 74 -99 SPO 1997 04 05 17 56 331 10.2 -9 692.10 -45.1 -45.2 -45.2 74 -99 SPO 1997 04 05 17 57 330 10.7 -9 692.10 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 05 17 58 331 10.4 -9 692.10 -45.1 -45.1 -45.2 73 -99 SPO 1997 04 05 17 59 332 10.6 -9 692.20 -45.1 -45.2 -45.2 74 -99 SPO 1997 04 05 18 00 330 10.5 -9 692.20 -45.1 -45.2 -45.2 75 0 SPO 1997 04 05 18 01 331 10.1 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 02 332 10.5 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 03 332 10.4 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 04 332 10.4 -9 692.20 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 05 332 10.2 -9 692.20 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 06 331 10.3 -9 692.30 -45.1 -45.1 -45.2 74 -99 SPO 1997 04 05 18 07 331 9.8 -9 692.30 -45.1 -45.1 -45.2 73 -99 SPO 1997 04 05 18 08 332 10.5 -9 692.30 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 05 18 09 332 9.7 -9 692.30 -45.1 -45.2 -45.2 72 -99 SPO 1997 04 05 18 10 331 10.2 -9 692.30 -45.1 -45.3 -45.2 73 -99 SPO 1997 04 05 18 11 330 10.4 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 12 331 10.2 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 13 331 9.9 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 14 330 10.1 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 15 330 10.1 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 16 330 10.4 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 17 331 10.2 -9 692.30 -45.1 -45.1 -45.1 75 -99 SPO 1997 04 05 18 18 331 10.3 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 19 331 10.2 -9 692.20 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 20 331 10.1 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 21 331 10.5 -9 692.30 -45.0 -45.0 -45.1 72 -99 SPO 1997 04 05 18 22 331 10.1 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 23 332 9.8 -9 692.30 -45.0 -45.1 -45.2 74 -99 SPO 1997 04 05 18 24 330 10.0 -9 692.30 -45.0 -45.1 -45.2 75 -99 SPO 1997 04 05 18 25 330 10.2 -9 692.30 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 26 330 10.1 -9 692.30 -45.0 -45.1 -45.2 74 -99 SPO 1997 04 05 18 27 331 10.2 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 28 330 10.0 -9 692.30 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 18 29 330 10.0 -9 692.30 -45.0 -45.2 -45.1 74 -99 SPO 1997 04 05 18 30 329 9.9 -9 692.30 -45.0 -45.2 -45.1 74 -99 SPO 1997 04 05 18 31 329 10.5 -9 692.20 -45.0 -45.2 -45.1 73 -99 SPO 1997 04 05 18 32 329 10.2 -9 692.20 -45.0 -45.1 -45.0 72 -99 SPO 1997 04 05 18 33 329 10.2 -9 692.20 -44.9 -45.1 -45.0 71 -99 SPO 1997 04 05 18 34 329 10.1 -9 692.20 -44.9 -45.1 -45.0 71 -99 SPO 1997 04 05 18 35 329 9.7 -9 692.30 -44.9 -45.0 -45.0 72 -99 SPO 1997 04 05 18 36 330 9.8 -9 692.20 -45.0 -45.1 -45.0 74 -99 SPO 1997 04 05 18 37 330 10.0 -9 692.20 -45.0 -45.1 -45.0 77 -99 SPO 1997 04 05 18 38 331 10.1 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 39 331 10.1 -9 692.20 -45.0 -45.1 -45.1 80 -99 SPO 1997 04 05 18 40 332 9.8 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 41 330 10.3 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 42 331 9.7 -9 692.30 -45.0 -45.1 -45.1 78 -99 SPO 1997 04 05 18 43 331 9.6 -9 692.20 -45.0 -45.1 -45.1 77 -99 SPO 1997 04 05 18 44 330 10.0 -9 692.30 -45.0 -45.0 -45.1 75 -99 SPO 1997 04 05 18 45 330 9.5 -9 692.30 -45.0 -45.0 -45.1 74 -99 SPO 1997 04 05 18 46 330 9.6 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 47 330 9.4 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 48 329 9.6 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 49 329 9.6 -9 692.30 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 18 50 329 9.4 -9 692.30 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 18 51 328 9.6 -9 692.30 -45.0 -45.2 -45.1 75 -99 SPO 1997 04 05 18 52 328 9.0 -9 692.40 -44.9 -45.2 -45.1 74 -99 SPO 1997 04 05 18 53 328 9.4 -9 692.40 -45.0 -45.2 -45.1 76 -99 SPO 1997 04 05 18 54 328 9.5 -9 692.30 -45.0 -45.2 -45.1 76 -99 SPO 1997 04 05 18 55 329 9.6 -9 692.30 -44.9 -45.1 -45.1 74 -99 SPO 1997 04 05 18 56 328 9.9 -9 692.20 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 18 57 328 9.8 -9 692.20 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 58 329 10.2 -9 692.20 -45.0 -45.1 -45.1 72 -99 SPO 1997 04 05 18 59 329 9.5 -9 692.20 -45.0 -45.1 -45.1 72 -99 SPO 1997 04 05 19 00 329 9.5 -9 692.20 -45.0 -45.1 -45.1 73 0 SPO 1997 04 05 19 01 329 9.7 -9 692.20 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 19 02 329 9.5 -9 692.20 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 19 03 329 9.7 -9 692.20 -45.0 -45.1 -45.0 76 -99 SPO 1997 04 05 19 04 328 9.8 -9 692.20 -45.0 -45.0 -45.0 76 -99 SPO 1997 04 05 19 05 328 9.6 -9 692.20 -45.0 -45.0 -45.0 77 -99 SPO 1997 04 05 19 06 329 9.8 -9 692.20 -44.9 -45.0 -45.0 76 -99 SPO 1997 04 05 19 07 328 9.7 -9 692.30 -44.9 -45.0 -45.0 76 -99 SPO 1997 04 05 19 08 327 9.3 -9 692.30 -44.9 -45.0 -45.0 75 -99 SPO 1997 04 05 19 09 328 9.7 -9 692.30 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 05 19 10 328 9.8 -9 692.20 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 05 19 11 328 9.7 -9 692.20 -44.8 -45.0 -44.9 73 -99 SPO 1997 04 05 19 12 328 9.7 -9 692.10 -44.8 -45.0 -44.9 73 -99 SPO 1997 04 05 19 13 329 9.7 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 14 328 9.9 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 15 328 9.8 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 16 329 9.8 -9 692.00 -44.8 -44.9 -44.9 75 -99 SPO 1997 04 05 19 17 329 10.2 -9 692.00 -44.8 -44.9 -44.9 75 -99 SPO 1997 04 05 19 18 329 10.1 -9 692.00 -44.8 -44.9 -44.8 76 -99 SPO 1997 04 05 19 19 329 10.1 -9 692.00 -44.8 -44.9 -44.8 76 -99 SPO 1997 04 05 19 20 330 9.8 -9 692.00 -44.7 -44.8 -44.8 75 -99 SPO 1997 04 05 19 21 330 10.1 -9 692.00 -44.8 -44.8 -44.8 75 -99 SPO 1997 04 05 19 22 331 10.3 -9 691.90 -44.8 -44.8 -44.8 74 -99 SPO 1997 04 05 19 23 330 10.4 -9 691.90 -44.7 -44.8 -44.8 73 -99 SPO 1997 04 05 19 24 329 10.3 -9 691.90 -44.7 -44.8 -44.8 73 -99 SPO 1997 04 05 19 25 329 10.3 -9 691.90 -44.7 -44.7 -44.8 73 -99 SPO 1997 04 05 19 26 328 10.1 -9 691.90 -44.7 -44.6 -44.7 74 -99 SPO 1997 04 05 19 27 328 10.3 -9 691.90 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 05 19 28 328 10.0 -9 691.90 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 29 328 9.8 -9 692.00 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 30 328 9.9 -9 692.00 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 05 19 31 328 9.5 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 32 329 9.9 -9 692.00 -44.5 -44.7 -44.7 74 -99 SPO 1997 04 05 19 33 329 10.1 -9 692.00 -44.6 -44.7 -44.7 75 -99 SPO 1997 04 05 19 34 327 9.8 -9 692.00 -44.6 -44.7 -44.7 74 -99 SPO 1997 04 05 19 35 327 9.9 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 36 326 9.6 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 37 327 9.7 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 38 327 9.7 -9 692.00 -44.5 -44.6 -44.6 73 -99 SPO 1997 04 05 19 39 327 9.6 -9 692.00 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 40 328 9.4 -9 692.10 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 41 327 9.5 -9 692.10 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 42 328 9.3 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 43 328 9.3 -9 692.20 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 19 44 328 8.8 -9 692.20 -44.5 -44.6 -44.6 75 -99 SPO 1997 04 05 19 45 328 9.6 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 46 328 9.1 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 47 328 9.1 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 48 328 9.0 -9 692.20 -44.4 -44.5 -44.6 73 -99 SPO 1997 04 05 19 49 329 8.9 -9 692.30 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 19 50 329 9.2 -9 692.30 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 19 51 329 8.9 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 52 329 9.0 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 53 328 9.1 -9 692.10 -44.4 -44.6 -44.6 74 -99 SPO 1997 04 05 19 54 328 9.1 -9 692.10 -44.5 -44.6 -44.6 75 -99 SPO 1997 04 05 19 55 327 9.5 -9 692.10 -44.5 -44.6 -44.6 76 -99 SPO 1997 04 05 19 56 328 9.2 -9 692.10 -44.5 -44.6 -44.5 75 -99 SPO 1997 04 05 19 57 329 9.6 -9 692.00 -44.5 -44.6 -44.5 75 -99 SPO 1997 04 05 19 58 329 9.4 -9 692.00 -44.4 -44.6 -44.6 74 -99 SPO 1997 04 05 19 59 328 9.4 -9 691.90 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 00 328 9.4 -9 692.00 -44.5 -44.5 -44.6 74 0 SPO 1997 04 05 20 01 328 9.3 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 02 329 9.4 -9 692.00 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 20 03 330 9.0 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 04 330 8.7 -9 692.00 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 20 05 331 8.8 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 06 330 9.0 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 07 330 8.6 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 08 330 8.8 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 09 330 8.5 -9 692.10 -44.5 -44.5 -44.5 75 -99 SPO 1997 04 05 20 10 331 8.4 -9 692.20 -44.4 -44.4 -44.5 74 -99 SPO 1997 04 05 20 11 331 8.3 -9 692.20 -44.4 -44.5 -44.5 74 -99 SPO 1997 04 05 20 12 332 8.4 -9 692.20 -44.4 -44.5 -44.5 74 -99 SPO 1997 04 05 20 13 331 8.6 -9 692.20 -44.4 -44.5 -44.5 73 -99 SPO 1997 04 05 20 14 330 8.7 -9 692.20 -44.4 -44.5 -44.4 73 -99 SPO 1997 04 05 20 15 331 8.8 -9 692.10 -44.4 -44.5 -44.4 74 -99 SPO 1997 04 05 20 16 329 8.8 -9 692.20 -44.3 -44.4 -44.4 73 -99 SPO 1997 04 05 20 17 329 8.4 -9 692.20 -44.3 -44.4 -44.3 74 -99 SPO 1997 04 05 20 18 329 8.7 -9 692.20 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 19 329 8.9 -9 692.20 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 20 331 8.8 -9 692.10 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 21 331 8.8 -9 692.10 -44.2 -44.3 -44.3 75 -99 SPO 1997 04 05 20 22 332 8.6 -9 692.00 -44.2 -44.3 -44.4 75 -99 SPO 1997 04 05 20 23 332 8.7 -9 692.00 -44.2 -44.3 -44.4 75 -99 SPO 1997 04 05 20 24 331 8.7 -9 692.00 -44.3 -44.3 -44.4 76 -99 SPO 1997 04 05 20 25 330 8.6 -9 692.00 -44.3 -44.3 -44.4 75 -99 SPO 1997 04 05 20 26 330 8.5 -9 692.10 -44.3 -44.2 -44.3 75 -99 SPO 1997 04 05 20 27 330 8.5 -9 692.20 -44.2 -44.3 -44.3 73 -99 SPO 1997 04 05 20 28 328 8.7 -9 692.10 -44.2 -44.2 -44.3 73 -99 SPO 1997 04 05 20 29 329 8.8 -9 692.10 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 05 20 30 329 9.1 -9 692.10 -44.2 -44.2 -44.2 74 -99 SPO 1997 04 05 20 31 328 8.9 -9 692.10 -44.2 -44.1 -44.2 75 -99 SPO 1997 04 05 20 32 327 9.1 -9 692.00 -44.2 -44.1 -44.2 75 -99 SPO 1997 04 05 20 33 328 9.2 -9 692.00 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 05 20 34 327 9.1 -9 692.00 -44.1 -44.1 -44.2 75 -99 SPO 1997 04 05 20 35 327 8.9 -9 691.90 -44.1 -44.1 -44.1 75 -99 SPO 1997 04 05 20 36 324 9.1 -9 691.90 -44.1 -44.1 -44.1 75 -99 SPO 1997 04 05 20 37 323 9.5 -9 691.90 -44.0 -44.0 -44.0 75 -99 SPO 1997 04 05 20 38 326 9.1 -9 691.90 -43.9 -44.0 -43.9 74 -99 SPO 1997 04 05 20 39 327 8.3 -9 691.90 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 05 20 40 328 8.6 -9 692.00 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 41 328 8.5 -9 692.00 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 42 328 8.1 -9 691.90 -44.0 -44.1 -44.1 74 -99 SPO 1997 04 05 20 43 327 8.5 -9 691.90 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 44 326 8.9 -9 691.90 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 05 20 45 325 9.5 -9 691.90 -43.9 -43.9 -43.8 74 -99 SPO 1997 04 05 20 46 324 9.8 -9 691.80 -43.8 -43.8 -43.7 74 -99 SPO 1997 04 05 20 47 324 10.4 -9 691.80 -43.7 -43.7 -43.6 74 -99 SPO 1997 04 05 20 48 323 9.9 -9 691.80 -43.6 -43.6 -43.6 74 -99 SPO 1997 04 05 20 49 324 10.5 -9 691.80 -43.6 -43.6 -43.6 74 -99 SPO 1997 04 05 20 50 323 9.5 -9 691.80 -43.5 -43.5 -43.6 73 -99 SPO 1997 04 05 20 51 324 10.2 -9 691.80 -43.5 -43.5 -43.5 73 -99 SPO 1997 04 05 20 52 323 9.7 -9 691.90 -43.5 -43.5 -43.5 72 -99 SPO 1997 04 05 20 53 324 9.4 -9 691.90 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 05 20 54 324 9.6 -9 691.90 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 05 20 55 325 9.7 -9 691.90 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 20 56 325 9.8 -9 691.90 -43.4 -43.5 -43.4 74 -99 SPO 1997 04 05 20 57 325 9.2 -9 691.90 -43.4 -43.5 -43.4 75 -99 SPO 1997 04 05 20 58 327 9.4 -9 691.90 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 20 59 326 9.6 -9 691.90 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 21 00 327 9.4 -9 691.80 -43.3 -43.5 -43.4 74 0 SPO 1997 04 05 21 01 326 9.5 -9 691.80 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 21 02 325 9.9 -9 691.80 -43.4 -43.5 -43.4 74 -99 SPO 1997 04 05 21 03 324 10.1 -9 691.80 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 04 326 9.7 -9 691.80 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 05 325 9.8 -9 691.80 -43.4 -43.4 -43.4 71 -99 SPO 1997 04 05 21 06 326 9.7 -9 691.80 -43.3 -43.3 -43.4 72 -99 SPO 1997 04 05 21 07 325 10.1 -9 691.80 -43.2 -43.3 -43.4 71 -99 SPO 1997 04 05 21 08 325 10.3 -9 691.70 -43.2 -43.3 -43.3 72 -99 SPO 1997 04 05 21 09 325 10.1 -9 691.70 -43.3 -43.3 -43.3 74 -99 SPO 1997 04 05 21 10 325 10.0 -9 691.60 -43.3 -43.3 -43.4 74 -99 SPO 1997 04 05 21 11 325 10.4 -9 691.60 -43.3 -43.3 -43.4 74 -99 SPO 1997 04 05 21 12 324 10.7 -9 691.50 -43.3 -43.3 -43.4 73 -99 SPO 1997 04 05 21 13 323 10.0 -9 691.60 -43.3 -43.3 -43.4 73 -99 SPO 1997 04 05 21 14 324 10.2 -9 691.60 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 15 323 10.2 -9 691.60 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 16 325 9.8 -9 691.60 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 17 323 10.1 -9 691.60 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 18 323 10.1 -9 691.70 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 19 323 9.6 -9 691.70 -43.3 -43.5 -43.4 71 -99 SPO 1997 04 05 21 20 324 9.6 -9 691.70 -43.3 -43.5 -43.4 72 -99 SPO 1997 04 05 21 21 323 9.9 -9 691.70 -43.3 -43.5 -43.4 73 -99 SPO 1997 04 05 21 22 322 9.6 -9 691.70 -43.3 -43.4 -43.3 73 -99 SPO 1997 04 05 21 23 323 9.5 -9 691.70 -43.3 -43.4 -43.3 74 -99 SPO 1997 04 05 21 24 322 9.1 -9 691.80 -43.3 -43.4 -43.3 74 -99 SPO 1997 04 05 21 25 321 8.8 -9 691.80 -43.3 -43.4 -43.3 75 -99 SPO 1997 04 05 21 26 321 8.6 -9 691.90 -43.3 -43.4 -43.3 76 -99 SPO 1997 04 05 21 27 322 8.8 -9 691.90 -43.3 -43.4 -43.3 76 -99 SPO 1997 04 05 21 28 321 8.9 -9 691.90 -43.2 -43.3 -43.3 76 -99 SPO 1997 04 05 21 29 322 8.9 -9 691.80 -43.1 -43.3 -43.3 75 -99 SPO 1997 04 05 21 30 321 8.6 -9 691.90 -43.1 -43.3 -43.2 73 -99 SPO 1997 04 05 21 31 320 9.0 -9 691.90 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 32 320 8.9 -9 691.90 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 33 320 9.2 -9 691.80 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 34 320 9.2 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 35 320 9.3 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 36 320 9.3 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 37 321 9.0 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 38 320 8.9 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 39 320 9.0 -9 691.80 -43.1 -43.2 -43.2 76 -99 SPO 1997 04 05 21 40 320 9.1 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 41 320 9.0 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 42 320 9.0 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 43 320 8.9 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 44 319 9.0 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 45 319 9.3 -9 691.80 -43.1 -43.1 -43.1 74 -99 SPO 1997 04 05 21 46 319 9.0 -9 691.70 -43.1 -43.1 -43.1 74 -99 SPO 1997 04 05 21 47 318 8.8 -9 691.70 -43.0 -43.1 -43.1 74 -99 SPO 1997 04 05 21 48 317 9.4 -9 691.70 -43.0 -43.1 -43.0 76 -99 SPO 1997 04 05 21 49 318 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 50 319 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 51 318 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 52 318 9.1 -9 691.70 -42.9 -43.0 -43.0 75 -99 SPO 1997 04 05 21 53 318 9.2 -9 691.70 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 21 54 318 9.2 -9 691.80 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 21 55 319 8.9 -9 691.70 -42.9 -43.0 -43.0 75 -99 SPO 1997 04 05 21 56 318 8.8 -9 691.80 -42.9 -43.0 -43.0 73 -99 SPO 1997 04 05 21 57 319 9.1 -9 691.80 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 05 21 58 319 8.8 -9 691.70 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 05 21 59 318 9.2 -9 691.70 -43.0 -43.0 -43.0 74 -99 SPO 1997 04 05 22 00 318 9.2 -9 691.70 -42.9 -43.0 -43.0 75 0 SPO 1997 04 05 22 01 318 9.0 -9 691.60 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 22 02 317 9.2 -9 691.60 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 22 03 316 9.0 -9 691.70 -42.9 -42.9 -42.9 76 -99 SPO 1997 04 05 22 04 315 8.9 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 05 314 8.8 -9 691.80 -42.8 -42.8 -42.8 75 -99 SPO 1997 04 05 22 06 315 8.2 -9 691.80 -42.8 -42.8 -42.9 75 -99 SPO 1997 04 05 22 07 316 8.5 -9 691.80 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 08 316 8.7 -9 691.80 -42.8 -42.9 -42.9 76 -99 SPO 1997 04 05 22 09 316 8.7 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 10 316 8.7 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 11 316 8.9 -9 691.70 -42.9 -42.9 -42.9 76 -99 SPO 1997 04 05 22 12 317 8.6 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 13 316 8.7 -9 691.70 -42.8 -42.8 -42.9 75 -99 SPO 1997 04 05 22 14 316 8.5 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 15 317 8.0 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 16 315 8.4 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 17 315 8.1 -9 691.80 -42.8 -42.8 -42.8 76 -99 SPO 1997 04 05 22 18 316 8.0 -9 691.80 -42.7 -42.7 -42.8 74 -99 SPO 1997 04 05 22 19 317 8.4 -9 691.70 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 05 22 20 317 8.3 -9 691.70 -42.7 -42.8 -42.8 75 -99 SPO 1997 04 05 22 21 317 8.4 -9 691.60 -42.7 -42.8 -42.7 75 -99 SPO 1997 04 05 22 22 317 8.8 -9 691.60 -42.7 -42.8 -42.7 75 -99 SPO 1997 04 05 22 23 317 8.8 -9 691.60 -42.7 -42.7 -42.7 75 -99 SPO 1997 04 05 22 24 317 8.7 -9 691.60 -42.6 -42.7 -42.7 73 -99 SPO 1997 04 05 22 25 318 8.5 -9 691.60 -42.6 -42.7 -42.6 74 -99 SPO 1997 04 05 22 26 316 8.4 -9 691.60 -42.6 -42.7 -42.7 75 -99 SPO 1997 04 05 22 27 316 8.6 -9 691.60 -42.6 -42.7 -42.7 76 -99 SPO 1997 04 05 22 28 315 8.7 -9 691.60 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 29 316 9.1 -9 691.60 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 30 318 9.0 -9 691.60 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 31 319 9.1 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 32 319 9.3 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 33 319 9.3 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 34 319 9.6 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 35 319 9.2 -9 691.50 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 36 319 9.1 -9 691.50 -42.5 -42.5 -42.6 74 -99 SPO 1997 04 05 22 37 319 9.0 -9 691.50 -42.4 -42.5 -42.6 73 -99 SPO 1997 04 05 22 38 319 9.2 -9 691.50 -42.5 -42.5 -42.6 74 -99 SPO 1997 04 05 22 39 319 9.2 -9 691.50 -42.5 -42.5 -42.6 75 -99 SPO 1997 04 05 22 40 320 8.9 -9 691.50 -42.5 -42.5 -42.6 75 -99 SPO 1997 04 05 22 41 319 8.5 -9 691.60 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 42 318 8.4 -9 691.60 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 43 318 8.2 -9 691.70 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 44 317 8.4 -9 691.70 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 45 317 8.1 -9 691.70 -42.5 -42.6 -42.5 77 -99 SPO 1997 04 05 22 46 316 8.2 -9 691.70 -42.4 -42.5 -42.5 76 -99 SPO 1997 04 05 22 47 316 8.1 -9 691.70 -42.4 -42.5 -42.4 75 -99 SPO 1997 04 05 22 48 316 7.8 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 49 316 8.0 -9 691.80 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 05 22 50 317 8.0 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 51 315 8.1 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 52 315 8.0 -9 691.80 -42.3 -42.4 -42.4 76 -99 SPO 1997 04 05 22 53 314 7.9 -9 691.80 -42.3 -42.3 -42.4 77 -99 SPO 1997 04 05 22 54 313 8.5 -9 691.80 -42.3 -42.3 -42.3 77 -99 SPO 1997 04 05 22 55 312 8.9 -9 691.80 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 56 313 8.6 -9 691.80 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 57 314 8.8 -9 691.70 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 58 313 8.4 -9 691.70 -42.2 -42.2 -42.2 77 -99 SPO 1997 04 05 22 59 313 8.4 -9 691.70 -42.2 -42.2 -42.2 77 -99 SPO 1997 04 05 23 00 313 8.4 -9 691.70 -42.1 -42.2 -42.2 77 0 SPO 1997 04 05 23 01 314 8.3 -9 691.70 -42.1 -42.2 -42.2 76 -99 SPO 1997 04 05 23 02 314 8.0 -9 691.60 -42.1 -42.1 -42.2 75 -99 SPO 1997 04 05 23 03 314 8.3 -9 691.60 -42.2 -42.2 -42.2 75 -99 SPO 1997 04 05 23 04 315 8.5 -9 691.50 -42.2 -42.2 -42.2 75 -99 SPO 1997 04 05 23 05 314 8.8 -9 691.50 -42.1 -42.2 -42.2 75 -99 SPO 1997 04 05 23 06 313 8.6 -9 691.50 -42.1 -42.2 -42.2 76 -99 SPO 1997 04 05 23 07 313 9.3 -9 691.50 -42.1 -42.2 -42.2 77 -99 SPO 1997 04 05 23 08 313 8.8 -9 691.50 -42.1 -42.2 -42.1 77 -99 SPO 1997 04 05 23 09 312 8.8 -9 691.50 -42.0 -42.1 -42.1 75 -99 SPO 1997 04 05 23 10 313 9.0 -9 691.50 -42.0 -42.1 -42.0 76 -99 SPO 1997 04 05 23 11 312 9.3 -9 691.50 -42.0 -42.1 -42.0 77 -99 SPO 1997 04 05 23 12 312 9.1 -9 691.50 -42.0 -42.0 -42.0 77 -99 SPO 1997 04 05 23 13 314 9.4 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 14 314 9.2 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 15 315 9.0 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 16 316 8.9 -9 691.50 -41.9 -42.0 -42.0 75 -99 SPO 1997 04 05 23 17 316 8.7 -9 691.50 -41.9 -41.9 -41.9 75 -99 SPO 1997 04 05 23 18 317 8.7 -9 691.50 -41.9 -41.9 -41.9 75 -99 SPO 1997 04 05 23 19 317 8.6 -9 691.50 -41.9 -41.9 -41.9 76 -99 SPO 1997 04 05 23 20 316 8.7 -9 691.50 -41.9 -41.9 -41.9 77 -99 SPO 1997 04 05 23 21 315 9.0 -9 691.60 -41.9 -41.8 -41.9 77 -99 SPO 1997 04 05 23 22 315 8.6 -9 691.60 -41.9 -41.8 -41.9 77 -99 SPO 1997 04 05 23 23 315 8.7 -9 691.60 -41.8 -41.8 -41.9 77 -99 SPO 1997 04 05 23 24 317 8.7 -9 691.50 -41.8 -41.8 -41.9 76 -99 SPO 1997 04 05 23 25 318 8.6 -9 691.50 -41.8 -41.9 -41.9 76 -99 SPO 1997 04 05 23 26 318 8.5 -9 691.50 -41.8 -42.0 -41.9 77 -99 SPO 1997 04 05 23 27 319 8.4 -9 691.50 -41.8 -42.0 -42.0 76 -99 SPO 1997 04 05 23 28 318 8.8 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 29 318 9.0 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 30 317 9.3 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 31 316 9.4 -9 691.40 -41.8 -41.9 -41.9 75 -99 SPO 1997 04 05 23 32 316 9.4 -9 691.40 -41.8 -41.9 -41.9 75 -99 SPO 1997 04 05 23 33 315 9.2 -9 691.40 -41.8 -41.9 -41.8 75 -99 SPO 1997 04 05 23 34 315 9.3 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 35 314 9.1 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 36 315 9.1 -9 691.50 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 37 315 9.1 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 38 314 9.0 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 39 314 8.8 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 40 315 8.6 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 41 314 8.9 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 42 314 8.7 -9 691.40 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 43 315 9.0 -9 691.40 -41.8 -41.8 -41.8 76 -99 SPO 1997 04 05 23 44 315 9.1 -9 691.40 -41.8 -41.8 -41.8 76 -99 SPO 1997 04 05 23 45 314 9.0 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 46 314 8.8 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 47 314 9.0 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 48 314 8.4 -9 691.40 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 49 313 8.4 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 50 313 8.1 -9 691.50 -41.7 -41.8 -41.8 78 -99 SPO 1997 04 05 23 51 312 8.2 -9 691.50 -41.7 -41.8 -41.8 78 -99 SPO 1997 04 05 23 52 311 8.5 -9 691.50 -41.7 -41.8 -41.7 78 -99 SPO 1997 04 05 23 53 310 7.5 -9 691.50 -41.7 -41.8 -41.7 78 -99 SPO 1997 04 05 23 54 310 7.9 -9 691.60 -41.7 -41.7 -41.7 78 -99 SPO 1997 04 05 23 55 310 8.0 -9 691.50 -41.6 -41.7 -41.7 77 -99 SPO 1997 04 05 23 56 311 8.2 -9 691.50 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 05 23 57 310 8.2 -9 691.50 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 05 23 58 312 8.5 -9 691.50 -41.6 -41.7 -41.6 -99 -99 SPO 1997 04 05 23 59 313 8.2 -9 691.50 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 00 313 8.0 -9 691.50 -41.6 -41.8 -41.7 -99 0 SPO 1997 04 06 00 01 313 8.3 -9 691.50 -41.6 -41.8 -41.7 -99 -99 SPO 1997 04 06 00 02 313 8.5 -9 691.50 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 03 313 9.0 -9 691.40 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 04 312 9.1 -9 691.40 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 05 313 8.8 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 06 312 9.2 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 07 311 8.7 -9 691.40 -41.5 -41.5 -41.6 -99 -99 SPO 1997 04 06 00 08 311 8.7 -9 691.40 -41.5 -41.5 -41.6 -99 -99 SPO 1997 04 06 00 09 312 8.9 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 10 314 9.2 -9 691.30 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 11 314 9.0 -9 691.20 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 12 314 9.2 -9 691.20 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 13 314 9.2 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 14 314 9.4 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 15 313 9.1 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 16 313 9.2 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 17 312 9.4 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 18 311 9.0 -9 691.20 -41.5 -41.6 -41.5 77 -99 SPO 1997 04 06 00 19 312 8.9 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 20 312 8.6 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 21 312 8.9 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 22 311 8.6 -9 691.30 -41.5 -41.5 -41.5 77 -99 SPO 1997 04 06 00 23 311 8.5 -9 691.40 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 24 311 8.4 -9 691.40 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 25 311 8.9 -9 691.40 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 26 311 8.6 -9 691.40 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 27 312 8.0 -9 691.40 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 28 314 7.9 -9 691.40 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 29 313 7.7 -9 691.40 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 30 313 8.2 -9 691.30 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 31 313 8.0 -9 691.30 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 32 313 8.2 -9 691.40 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 33 312 7.8 -9 691.40 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 34 311 8.0 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 35 311 8.2 -9 691.50 -41.4 -41.5 -41.4 77 -99 SPO 1997 04 06 00 36 311 7.5 -9 691.50 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 37 311 7.3 -9 691.50 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 38 310 7.4 -9 691.50 -41.4 -41.6 -41.5 77 -99 SPO 1997 04 06 00 39 310 7.9 -9 691.50 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 40 309 7.7 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 41 308 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 42 309 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 43 309 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 44 310 7.4 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 45 311 7.5 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 46 311 7.3 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 47 314 7.1 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 48 314 7.0 -9 691.40 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 49 313 7.3 -9 691.40 -41.4 -41.4 -41.5 77 -99 SPO 1997 04 06 00 50 313 7.2 -9 691.50 -41.4 -41.4 -41.4 76 -99 SPO 1997 04 06 00 51 313 7.3 -9 691.50 -41.4 -41.4 -41.4 76 -99 SPO 1997 04 06 00 52 313 7.2 -9 691.50 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 53 312 7.5 -9 691.50 -41.3 -41.3 -41.4 78 -99 SPO 1997 04 06 00 54 313 7.6 -9 691.50 -41.3 -41.3 -41.3 78 -99 SPO 1997 04 06 00 55 311 8.0 -9 691.50 -41.2 -41.3 -41.3 77 -99 SPO 1997 04 06 00 56 311 8.0 -9 691.50 -41.2 -41.3 -41.3 78 -99 SPO 1997 04 06 00 57 311 8.4 -9 691.40 -41.2 -41.3 -41.2 78 -99 SPO 1997 04 06 00 58 310 8.1 -9 691.40 -41.2 -41.3 -41.2 79 -99 SPO 1997 04 06 00 59 310 8.0 -9 691.40 -41.2 -41.3 -41.2 79 -99 SPO 1997 04 06 01 00 310 7.9 -9 691.40 -41.2 -41.2 -41.2 78 0 SPO 1997 04 06 01 01 310 7.7 -9 691.40 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 02 310 7.8 -9 691.40 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 03 311 7.8 -9 691.40 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 04 312 7.5 -9 691.40 -41.1 -41.2 -41.2 74 -99 SPO 1997 04 06 01 05 313 7.5 -9 691.30 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 06 314 7.4 -9 691.30 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 07 312 7.5 -9 691.30 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 08 312 7.7 -9 691.30 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 09 312 7.5 -9 691.30 -41.1 -41.1 -41.2 78 -99 SPO 1997 04 06 01 10 313 7.7 -9 691.30 -41.1 -41.1 -41.2 78 -99 SPO 1997 04 06 01 11 314 7.6 -9 691.30 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 12 315 7.5 -9 691.20 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 13 314 7.4 -9 691.20 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 14 314 7.9 -9 691.20 -41.1 -41.0 -41.1 80 -99 SPO 1997 04 06 01 15 314 7.9 -9 691.20 -41.0 -41.0 -41.1 78 -99 SPO 1997 04 06 01 16 312 8.0 -9 691.20 -41.0 -41.0 -41.1 77 -99 SPO 1997 04 06 01 17 312 8.2 -9 691.20 -41.0 -41.0 -41.1 77 -99 SPO 1997 04 06 01 18 312 8.4 -9 691.20 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 19 312 8.1 -9 691.20 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 20 313 8.2 -9 691.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 21 313 8.3 -9 691.10 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 22 315 8.5 -9 691.00 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 23 313 8.4 -9 691.10 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 24 313 8.5 -9 691.10 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 01 25 312 8.4 -9 691.10 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 01 26 313 8.3 -9 691.10 -41.0 -41.0 -41.0 79 -99 SPO 1997 04 06 01 27 313 8.3 -9 691.10 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 28 315 8.1 -9 691.10 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 29 314 8.2 -9 691.00 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 30 313 8.7 -9 691.00 -40.9 -40.9 -40.9 78 -99 SPO 1997 04 06 01 31 313 8.8 -9 691.00 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 01 32 313 9.2 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 33 312 8.9 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 34 312 8.6 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 35 312 8.3 -9 691.00 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 01 36 311 9.1 -9 690.90 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 01 37 311 9.2 -9 690.90 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 01 38 309 9.5 -9 690.90 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 01 39 310 9.5 -9 690.80 -40.7 -40.6 -40.7 77 -99 SPO 1997 04 06 01 40 309 9.6 -9 690.80 -40.7 -40.7 -40.7 77 -99 SPO 1997 04 06 01 41 310 8.8 -9 690.80 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 01 42 310 8.9 -9 690.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 01 43 311 8.6 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 44 310 8.8 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 45 310 8.7 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 46 310 8.2 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 47 311 8.3 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 48 309 8.1 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 49 309 8.6 -9 690.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 01 50 306 8.9 -9 690.90 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 51 306 8.9 -9 690.90 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 52 307 8.8 -9 690.80 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 53 307 9.4 -9 690.80 -40.7 -40.7 -40.7 79 -99 SPO 1997 04 06 01 54 307 9.2 -9 690.80 -40.7 -40.7 -40.7 79 -99 SPO 1997 04 06 01 55 308 9.7 -9 690.80 -40.6 -40.6 -40.7 78 -99 SPO 1997 04 06 01 56 308 9.0 -9 690.70 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 01 57 310 9.2 -9 690.70 -40.6 -40.6 -40.7 78 -99 SPO 1997 04 06 01 58 310 9.1 -9 690.70 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 01 59 311 8.6 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 00 311 9.1 -9 690.80 -40.6 -40.6 -40.7 76 0 SPO 1997 04 06 02 01 309 8.6 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 02 309 8.2 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 03 309 9.0 -9 690.90 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 02 04 307 9.1 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 05 309 8.8 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 06 307 8.5 -9 690.80 -40.6 -40.7 -40.7 79 -99 SPO 1997 04 06 02 07 307 9.0 -9 690.90 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 08 306 9.0 -9 690.90 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 09 307 8.5 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 10 307 8.9 -9 690.80 -40.6 -40.7 -40.6 79 -99 SPO 1997 04 06 02 11 307 9.1 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 12 308 8.5 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 13 308 8.1 -9 690.80 -40.6 -40.6 -40.6 78 -99 SPO 1997 04 06 02 14 309 8.3 -9 690.80 -40.6 -40.6 -40.6 78 -99 SPO 1997 04 06 02 15 310 8.3 -9 690.80 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 02 16 311 8.3 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 17 311 8.5 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 18 312 8.3 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 19 311 8.2 -9 690.80 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 20 311 8.7 -9 690.70 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 21 312 8.4 -9 690.70 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 22 311 8.9 -9 690.70 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 02 23 309 8.7 -9 690.80 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 02 24 309 9.1 -9 690.80 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 02 25 309 8.6 -9 690.80 -40.4 -40.5 -40.5 74 -99 SPO 1997 04 06 02 26 308 8.3 -9 690.80 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 02 27 307 8.2 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 28 308 8.4 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 29 308 8.5 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 30 308 8.2 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 02 31 308 8.3 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 02 32 309 7.9 -9 690.80 -40.5 -40.6 -40.6 79 -99 SPO 1997 04 06 02 33 309 8.1 -9 690.80 -40.5 -40.6 -40.5 79 -99 SPO 1997 04 06 02 34 309 7.8 -9 690.80 -40.5 -40.5 -40.5 79 -99 SPO 1997 04 06 02 35 310 7.3 -9 690.80 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 02 36 309 7.8 -9 690.80 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 02 37 311 7.7 -9 690.80 -40.4 -40.4 -40.5 77 -99 SPO 1997 04 06 02 38 312 7.9 -9 690.80 -40.4 -40.4 -40.4 77 -99 SPO 1997 04 06 02 39 312 7.7 -9 690.80 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 40 312 7.2 -9 690.80 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 41 312 7.6 -9 690.90 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 42 312 7.6 -9 690.80 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 43 314 7.4 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 44 315 7.5 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 45 315 7.6 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 46 317 8.0 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 47 315 7.8 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 48 315 8.1 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 49 314 7.7 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 50 315 7.7 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 51 315 8.0 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 52 315 8.2 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 53 315 7.9 -9 690.60 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 54 312 7.8 -9 690.60 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 55 313 7.8 -9 690.60 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 56 313 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 02 57 313 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 02 58 312 7.9 -9 690.60 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 59 313 8.0 -9 690.50 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 03 00 313 8.3 -9 690.50 -40.3 -40.4 -40.3 78 0 SPO 1997 04 06 03 01 314 8.1 -9 690.50 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 03 02 314 8.0 -9 690.50 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 03 315 7.3 -9 690.50 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 04 314 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 05 313 7.2 -9 690.60 -40.2 -40.3 -40.3 77 -99 SPO 1997 04 06 03 06 314 7.0 -9 690.60 -40.2 -40.3 -40.3 77 -99 SPO 1997 04 06 03 07 313 7.3 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 08 313 7.2 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 09 316 6.9 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 10 318 7.1 -9 690.70 -40.3 -40.4 -40.3 75 -99 SPO 1997 04 06 03 11 317 7.7 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 12 317 7.0 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 03 13 318 7.5 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 03 14 320 7.1 -9 690.60 -40.4 -40.6 -40.4 79 -99 SPO 1997 04 06 03 15 319 7.1 -9 690.60 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 16 318 6.9 -9 690.60 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 17 319 6.7 -9 690.70 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 18 319 6.9 -9 690.80 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 19 319 6.6 -9 690.80 -40.5 -40.6 -40.5 79 -99 SPO 1997 04 06 03 20 318 6.2 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 03 21 319 6.1 -9 690.80 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 03 22 321 6.4 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 23 322 6.4 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 24 321 6.2 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 25 323 6.4 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 03 26 322 6.6 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 03 27 322 6.9 -9 690.70 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 03 28 322 6.9 -9 690.70 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 03 29 322 6.7 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 30 323 7.0 -9 690.60 -40.4 -40.5 -40.5 79 -99 SPO 1997 04 06 03 31 321 7.1 -9 690.60 -40.4 -40.5 -40.5 79 -99 SPO 1997 04 06 03 32 320 7.2 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 33 320 7.0 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 34 321 6.9 -9 690.60 -40.4 -40.6 -40.5 77 -99 SPO 1997 04 06 03 35 320 6.7 -9 690.60 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 03 36 321 6.5 -9 690.60 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 03 37 322 6.8 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 38 321 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 39 320 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 40 320 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 41 320 6.7 -9 690.50 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 42 321 7.3 -9 690.50 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 43 322 6.9 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 44 321 6.9 -9 690.40 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 03 45 322 6.9 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 46 323 6.7 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 47 325 6.4 -9 690.40 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 03 48 325 6.3 -9 690.40 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 03 49 327 6.5 -9 690.40 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 03 50 328 6.6 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 03 51 329 6.5 -9 690.40 -40.7 -40.7 -40.8 75 -99 SPO 1997 04 06 03 52 328 6.7 -9 690.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 03 53 327 6.8 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 03 54 327 7.0 -9 690.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 03 55 326 7.3 -9 690.40 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 03 56 325 7.0 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 03 57 325 6.9 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 03 58 324 6.8 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 03 59 324 6.9 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 04 00 322 7.1 -9 690.40 -40.8 -40.9 -40.8 78 0 SPO 1997 04 06 04 01 322 7.2 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 04 02 321 7.1 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 04 03 322 7.2 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 04 323 7.1 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 05 323 7.0 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 06 325 7.1 -9 690.30 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 04 07 325 6.9 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 08 323 7.3 -9 690.30 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 04 09 324 7.1 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 10 323 7.1 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 11 324 7.0 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 12 328 7.0 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 13 330 6.8 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 14 327 7.3 -9 690.30 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 04 15 330 7.1 -9 690.30 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 04 16 326 7.2 -9 690.30 -40.8 -41.0 -41.0 76 -99 SPO 1997 04 06 04 17 325 7.0 -9 690.30 -40.8 -41.0 -41.0 75 -99 SPO 1997 04 06 04 18 327 7.0 -9 690.30 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 04 19 326 6.9 -9 690.30 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 04 20 326 7.1 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 21 326 7.1 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 22 325 7.2 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 23 325 7.3 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 24 324 7.1 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 25 324 7.2 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 26 323 7.2 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 27 324 7.3 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 28 323 7.3 -9 690.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 29 324 7.8 -9 690.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 30 324 8.0 -9 690.10 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 31 325 8.1 -9 690.10 -41.0 -41.1 -41.0 75 -99 SPO 1997 04 06 04 32 326 8.0 -9 690.10 -41.0 -41.1 -41.0 75 -99 SPO 1997 04 06 04 33 324 8.3 -9 690.00 -41.0 -41.0 -41.0 75 -99 SPO 1997 04 06 04 34 323 8.4 -9 690.00 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 35 323 8.4 -9 690.00 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 36 325 8.4 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 37 324 8.0 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 38 323 8.4 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 39 322 8.0 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 40 322 7.9 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 41 323 8.1 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 42 324 7.6 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 04 43 324 8.0 -9 690.10 -41.1 -41.3 -41.2 78 -99 SPO 1997 04 06 04 44 325 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 45 323 7.6 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 46 323 7.6 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 47 325 7.6 -9 690.00 -41.1 -41.4 -41.2 74 -99 SPO 1997 04 06 04 48 324 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 49 322 8.0 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 50 322 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 51 323 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 52 322 7.8 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 53 320 7.4 -9 690.10 -41.1 -41.3 -41.2 76 -99 SPO 1997 04 06 04 54 321 7.4 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 55 320 7.5 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 56 321 7.7 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 57 321 7.7 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 58 320 7.5 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 04 59 321 7.5 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 00 322 7.5 -9 690.10 -41.1 -41.2 -41.1 74 0 SPO 1997 04 06 05 01 323 7.3 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 02 323 7.2 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 03 322 7.1 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 05 04 322 7.3 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 05 05 323 7.4 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 06 323 7.0 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 07 322 6.8 -9 690.10 -41.0 -41.3 -41.1 78 -99 SPO 1997 04 06 05 08 321 7.0 -9 690.10 -41.1 -41.3 -41.1 78 -99 SPO 1997 04 06 05 09 321 6.9 -9 690.10 -41.1 -41.3 -41.1 78 -99 SPO 1997 04 06 05 10 321 7.2 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 11 320 7.3 -9 690.00 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 12 318 7.6 -9 690.00 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 13 319 7.6 -9 690.00 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 14 319 7.1 -9 689.90 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 15 320 7.5 -9 689.90 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 16 320 7.3 -9 689.90 -41.0 -41.2 -41.1 78 -99 SPO 1997 04 06 05 17 320 8.1 -9 689.90 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 18 318 8.0 -9 689.90 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 19 318 7.9 -9 689.90 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 20 320 7.7 -9 689.90 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 21 323 7.8 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 22 319 7.8 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 23 316 8.2 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 24 317 8.0 -9 689.80 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 25 317 7.7 -9 689.80 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 05 26 316 8.0 -9 689.80 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 05 27 319 7.7 -9 689.80 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 05 28 317 8.0 -9 689.80 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 05 29 317 7.7 -9 689.80 -40.9 -41.1 -40.9 77 -99 SPO 1997 04 06 05 30 317 7.8 -9 689.80 -40.9 -41.1 -41.0 77 -99 SPO 1997 04 06 05 31 319 7.6 -9 689.80 -40.9 -41.1 -40.9 78 -99 SPO 1997 04 06 05 32 318 7.8 -9 689.80 -40.9 -41.0 -40.9 78 -99 SPO 1997 04 06 05 33 318 7.8 -9 689.80 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 34 319 8.1 -9 689.70 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 35 318 7.8 -9 689.70 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 36 317 8.0 -9 689.70 -40.8 -41.0 -40.8 78 -99 SPO 1997 04 06 05 37 317 8.0 -9 689.80 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 05 38 317 7.9 -9 689.80 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 05 39 316 7.8 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 40 315 7.4 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 41 316 7.8 -9 689.80 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 05 42 317 8.0 -9 689.80 -40.7 -40.8 -40.7 75 -99 SPO 1997 04 06 05 43 315 8.3 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 44 316 8.5 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 45 317 8.4 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 46 317 8.2 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 47 318 8.4 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 48 318 8.0 -9 689.70 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 49 317 8.4 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 50 319 8.2 -9 689.70 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 51 320 8.6 -9 689.70 -40.7 -40.9 -40.7 77 -99 SPO 1997 04 06 05 52 319 8.3 -9 689.70 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 53 319 8.6 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 54 319 8.6 -9 689.80 -40.7 -40.9 -40.7 77 -99 SPO 1997 04 06 05 55 319 8.1 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 56 318 8.3 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 57 318 8.0 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 58 318 7.8 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 59 318 7.8 -9 689.80 -40.7 -40.9 -40.8 79 -99 SPO 1997 04 06 06 00 319 7.5 -9 689.90 -40.7 -40.8 -40.8 79 0 SPO 1997 04 06 06 01 320 7.8 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 02 320 7.5 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 03 320 7.3 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 04 321 7.3 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 05 321 7.8 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 06 321 7.9 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 07 322 8.0 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 08 322 7.8 -9 689.80 -40.7 -40.7 -40.7 75 -99 SPO 1997 04 06 06 09 320 7.8 -9 689.80 -40.7 -40.7 -40.7 75 -99 SPO 1997 04 06 06 10 320 8.3 -9 689.70 -40.6 -40.7 -40.7 74 -99 SPO 1997 04 06 06 11 319 8.0 -9 689.70 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 06 12 319 8.3 -9 689.70 -40.6 -40.7 -40.6 76 -99 SPO 1997 04 06 06 13 319 8.5 -9 689.70 -40.6 -40.7 -40.6 76 -99 SPO 1997 04 06 06 14 319 8.5 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 15 319 8.3 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 16 320 8.0 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 17 320 8.2 -9 689.70 -40.6 -40.8 -40.7 78 -99 SPO 1997 04 06 06 18 320 8.0 -9 689.70 -40.6 -40.8 -40.7 78 -99 SPO 1997 04 06 06 19 321 8.5 -9 689.70 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 20 321 8.6 -9 689.60 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 21 321 8.7 -9 689.60 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 22 320 8.8 -9 689.60 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 23 320 8.6 -9 689.60 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 06 24 320 8.8 -9 689.60 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 25 320 8.7 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 26 321 8.2 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 27 320 8.9 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 28 322 8.5 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 29 322 8.8 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 30 322 9.1 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 31 321 9.1 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 32 321 8.9 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 33 322 8.6 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 34 320 8.8 -9 689.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 06 35 322 8.4 -9 689.40 -40.7 -40.9 -40.8 74 -99 SPO 1997 04 06 06 36 321 8.4 -9 689.40 -40.8 -41.0 -40.8 76 -99 SPO 1997 04 06 06 37 320 8.2 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 38 321 8.6 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 39 320 8.7 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 40 321 8.5 -9 689.50 -40.8 -41.1 -40.9 76 -99 SPO 1997 04 06 06 41 320 8.5 -9 689.40 -40.9 -41.1 -40.9 77 -99 SPO 1997 04 06 06 42 321 8.7 -9 689.40 -40.8 -41.1 -40.9 76 -99 SPO 1997 04 06 06 43 321 8.3 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 06 44 321 8.4 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 06 45 322 8.6 -9 689.40 -40.9 -41.0 -40.9 77 -99 SPO 1997 04 06 06 46 323 8.4 -9 689.40 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 06 47 322 7.9 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 48 323 7.9 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 49 325 8.1 -9 689.40 -40.9 -41.0 -41.0 74 -99 SPO 1997 04 06 06 50 325 8.3 -9 689.40 -40.9 -41.0 -41.0 74 -99 SPO 1997 04 06 06 51 324 8.7 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 52 324 8.8 -9 689.40 -40.9 -40.9 -40.9 76 -99 SPO 1997 04 06 06 53 325 8.7 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 54 326 8.8 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 55 325 8.8 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 56 324 8.7 -9 689.40 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 06 57 325 8.7 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 58 324 8.7 -9 689.40 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 06 59 325 8.9 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 00 325 8.8 -9 689.40 -40.8 -41.0 -40.9 75 0 SPO 1997 04 06 07 01 326 8.4 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 02 326 8.1 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 03 324 8.7 -9 689.40 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 04 325 8.4 -9 689.40 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 05 325 8.6 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 06 325 8.7 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 07 324 8.3 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 08 324 8.2 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 09 324 8.2 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 10 324 8.3 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 11 323 8.3 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 12 323 7.8 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 13 323 8.0 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 14 323 8.1 -9 689.30 -40.8 -41.0 -41.0 75 -99 SPO 1997 04 06 07 15 323 8.0 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 16 324 8.3 -9 689.30 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 17 323 8.3 -9 689.30 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 18 323 8.3 -9 689.20 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 19 323 8.4 -9 689.20 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 07 20 322 8.2 -9 689.20 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 21 322 8.9 -9 689.20 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 07 22 322 8.4 -9 689.20 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 23 323 8.7 -9 689.20 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 07 24 322 8.7 -9 689.10 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 07 25 321 8.7 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 26 320 8.6 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 27 319 8.3 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 28 318 8.5 -9 689.10 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 07 29 317 8.7 -9 689.10 -40.7 -40.8 -40.7 74 -99 SPO 1997 04 06 07 30 317 8.8 -9 689.10 -40.7 -40.7 -40.7 74 -99 SPO 1997 04 06 07 31 316 8.6 -9 689.10 -40.6 -40.7 -40.6 74 -99 SPO 1997 04 06 07 32 317 8.7 -9 689.10 -40.6 -40.6 -40.6 74 -99 SPO 1997 04 06 07 33 316 9.0 -9 689.10 -40.6 -40.6 -40.6 74 -99 SPO 1997 04 06 07 34 316 9.1 -9 689.10 -40.5 -40.6 -40.6 74 -99 SPO 1997 04 06 07 35 316 8.9 -9 689.00 -40.5 -40.5 -40.6 75 -99 SPO 1997 04 06 07 36 317 8.9 -9 689.00 -40.5 -40.5 -40.5 75 -99 SPO 1997 04 06 07 37 316 8.6 -9 689.00 -40.5 -40.4 -40.5 75 -99 SPO 1997 04 06 07 38 316 8.7 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 39 317 8.6 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 40 317 8.7 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 41 319 8.3 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 42 321 8.6 -9 689.00 -40.4 -40.4 -40.6 74 -99 SPO 1997 04 06 07 43 322 8.3 -9 689.00 -40.5 -40.4 -40.6 75 -99 SPO 1997 04 06 07 44 323 8.3 -9 689.00 -40.5 -40.5 -40.6 75 -99 SPO 1997 04 06 07 45 324 8.0 -9 689.00 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 07 46 324 7.7 -9 689.00 -40.6 -40.6 -40.6 76 -99 SPO 1997 04 06 07 47 324 7.6 -9 689.10 -40.6 -40.6 -40.6 76 -99 SPO 1997 04 06 07 48 325 7.7 -9 689.10 -40.5 -40.6 -40.6 75 -99 SPO 1997 04 06 07 49 325 7.8 -9 689.10 -40.5 -40.6 -40.6 75 -99 SPO 1997 04 06 07 50 323 7.5 -9 689.10 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 07 51 323 7.8 -9 689.10 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 07 52 322 8.1 -9 689.10 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 07 53 322 8.3 -9 689.10 -40.3 -40.3 -40.3 75 -99 SPO 1997 04 06 07 54 322 8.6 -9 689.00 -40.3 -40.2 -40.3 75 -99 SPO 1997 04 06 07 55 322 8.8 -9 689.00 -40.2 -40.1 -40.2 75 -99 SPO 1997 04 06 07 56 323 8.8 -9 689.00 -40.2 -40.1 -40.2 75 -99 SPO 1997 04 06 07 57 322 8.6 -9 689.00 -40.2 -40.0 -40.2 75 -99 SPO 1997 04 06 07 58 322 8.4 -9 689.00 -40.1 -40.0 -40.2 74 -99 SPO 1997 04 06 07 59 322 7.9 -9 689.00 -40.1 -40.0 -40.1 74 -99 SPO 1997 04 06 08 00 322 8.0 -9 689.10 -40.1 -40.0 -40.1 75 0 SPO 1997 04 06 08 01 320 8.0 -9 689.10 -40.0 -40.0 -40.1 75 -99 SPO 1997 04 06 08 02 320 8.2 -9 689.10 -40.0 -39.9 -40.0 75 -99 SPO 1997 04 06 08 03 320 8.1 -9 689.10 -40.0 -39.9 -40.0 75 -99 SPO 1997 04 06 08 04 320 8.4 -9 689.10 -39.9 -39.8 -40.0 76 -99 SPO 1997 04 06 08 05 320 8.6 -9 689.10 -39.9 -39.8 -40.0 76 -99 SPO 1997 04 06 08 06 320 8.6 -9 689.00 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 07 321 8.5 -9 689.00 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 08 321 8.4 -9 689.10 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 09 320 7.9 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 10 320 7.5 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 11 319 7.6 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 12 319 7.3 -9 689.20 -39.8 -39.9 -39.8 75 -99 SPO 1997 04 06 08 13 319 7.0 -9 689.20 -39.8 -39.9 -39.8 75 -99 SPO 1997 04 06 08 14 319 7.0 -9 689.20 -39.8 -39.8 -39.8 75 -99 SPO 1997 04 06 08 15 320 6.9 -9 689.20 -39.8 -39.8 -39.8 76 -99 SPO 1997 04 06 08 16 320 6.5 -9 689.20 -39.7 -39.8 -39.8 75 -99 SPO 1997 04 06 08 17 320 6.6 -9 689.20 -39.7 -39.8 -39.8 75 -99 SPO 1997 04 06 08 18 319 6.6 -9 689.20 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 19 319 6.5 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 20 318 6.7 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 21 318 7.0 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 22 319 7.2 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 23 319 7.4 -9 689.10 -39.7 -39.6 -39.8 77 -99 SPO 1997 04 06 08 24 319 7.6 -9 689.10 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 25 320 7.8 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 26 319 8.1 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 27 319 7.9 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 28 319 7.9 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 29 319 7.6 -9 689.20 -39.7 -39.6 -39.7 77 -99 SPO 1997 04 06 08 30 320 7.3 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 31 321 7.2 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 32 323 7.0 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 33 324 6.8 -9 689.20 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 34 324 6.8 -9 689.30 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 35 324 6.7 -9 689.30 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 36 324 7.1 -9 689.30 -39.8 -39.8 -39.8 78 -99 SPO 1997 04 06 08 37 324 6.9 -9 689.30 -39.8 -39.8 -39.8 78 -99 SPO 1997 04 06 08 38 323 7.0 -9 689.20 -39.8 -39.8 -39.8 76 -99 SPO 1997 04 06 08 39 322 6.9 -9 689.20 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 40 323 6.9 -9 689.20 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 41 322 6.9 -9 689.20 -39.8 -39.8 -39.8 75 -99 SPO 1997 04 06 08 42 322 6.5 -9 689.20 -39.8 -39.7 -39.8 75 -99 SPO 1997 04 06 08 43 322 6.1 -9 689.30 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 44 322 5.9 -9 689.30 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 45 320 5.6 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 46 322 5.5 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 47 323 5.5 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 48 324 5.6 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 49 323 5.6 -9 689.30 -39.8 -39.7 -39.8 78 -99 SPO 1997 04 06 08 50 322 6.1 -9 689.30 -39.8 -39.7 -39.8 78 -99 SPO 1997 04 06 08 51 323 6.0 -9 689.20 -39.8 -39.6 -39.8 76 -99 SPO 1997 04 06 08 52 323 6.5 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 53 324 6.8 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 54 324 7.2 -9 689.10 -39.7 -39.5 -39.7 73 -99 SPO 1997 04 06 08 55 325 7.4 -9 689.10 -39.7 -39.5 -39.7 73 -99 SPO 1997 04 06 08 56 325 7.4 -9 689.00 -39.7 -39.5 -39.7 75 -99 SPO 1997 04 06 08 57 327 7.8 -9 689.00 -39.6 -39.5 -39.7 75 -99 SPO 1997 04 06 08 58 328 7.8 -9 689.00 -39.6 -39.5 -39.7 76 -99 SPO 1997 04 06 08 59 329 8.0 -9 689.00 -39.7 -39.5 -39.8 77 -99 SPO 1997 04 06 09 00 330 8.0 -9 688.90 -39.7 -39.5 -39.8 77 0 SPO 1997 04 06 09 01 329 7.8 -9 688.90 -39.7 -39.5 -39.7 77 -99 SPO 1997 04 06 09 02 329 7.9 -9 688.90 -39.7 -39.5 -39.7 77 -99 SPO 1997 04 06 09 03 327 7.7 -9 688.90 -39.6 -39.5 -39.7 76 -99 SPO 1997 04 06 09 04 326 7.9 -9 688.90 -39.6 -39.4 -39.6 76 -99 SPO 1997 04 06 09 05 326 7.6 -9 688.90 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 06 324 7.7 -9 688.90 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 07 324 7.4 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 08 328 6.9 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 09 328 7.0 -9 689.00 -39.5 -39.4 -39.6 74 -99 SPO 1997 04 06 09 10 328 6.9 -9 689.00 -39.5 -39.4 -39.6 75 -99 SPO 1997 04 06 09 11 328 7.0 -9 689.00 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 12 327 7.4 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 13 327 7.5 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 14 327 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 15 328 7.2 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 16 327 7.5 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 17 329 7.6 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 18 329 7.5 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 19 329 7.7 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 20 329 7.7 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 21 329 7.7 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 22 329 7.7 -9 688.90 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 23 328 7.0 -9 689.00 -39.4 -39.4 -39.4 73 -99 SPO 1997 04 06 09 24 330 6.9 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 25 332 6.8 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 26 331 6.8 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 27 332 6.7 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 28 332 6.9 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 29 333 6.8 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 30 332 7.0 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 31 332 7.1 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 32 332 7.2 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 33 332 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 34 332 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 35 332 7.1 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 36 330 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 37 327 7.5 -9 689.00 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 38 325 7.8 -9 688.90 -39.3 -39.2 -39.3 72 -99 SPO 1997 04 06 09 39 323 8.1 -9 688.90 -39.2 -39.1 -39.2 73 -99 SPO 1997 04 06 09 40 321 8.6 -9 688.80 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 09 41 323 8.0 -9 688.80 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 06 09 42 324 8.2 -9 688.80 -39.1 -39.1 -39.2 72 -99 SPO 1997 04 06 09 43 325 8.2 -9 688.80 -39.2 -39.1 -39.2 73 -99 SPO 1997 04 06 09 44 326 8.3 -9 688.80 -39.2 -39.2 -39.4 73 -99 SPO 1997 04 06 09 45 326 8.6 -9 688.70 -39.3 -39.2 -39.4 76 -99 SPO 1997 04 06 09 46 325 8.4 -9 688.70 -39.4 -39.2 -39.5 76 -99 SPO 1997 04 06 09 47 325 8.3 -9 688.70 -39.4 -39.3 -39.5 76 -99 SPO 1997 04 06 09 48 325 8.9 -9 688.60 -39.4 -39.3 -39.5 76 -99 SPO 1997 04 06 09 49 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 50 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 51 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 52 323 8.8 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 53 323 8.7 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 54 321 8.7 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 55 321 8.6 -9 688.60 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 56 322 8.9 -9 688.50 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 57 323 9.0 -9 688.50 -39.3 -39.1 -39.4 74 -99 SPO 1997 04 06 09 58 322 9.1 -9 688.40 -39.3 -39.0 -39.4 74 -99 SPO 1997 04 06 09 59 322 8.9 -9 688.40 -39.3 -39.0 -39.3 74 -99 SPO 1997 04 06 10 00 323 9.0 -9 688.30 -39.3 -39.0 -39.3 76 0 SPO 1997 04 06 10 01 323 9.0 -9 688.20 -39.2 -39.0 -39.3 75 -99 SPO 1997 04 06 10 02 322 9.2 -9 688.20 -39.2 -39.0 -39.3 75 -99 SPO 1997 04 06 10 03 323 9.0 -9 688.10 -39.2 -39.0 -39.2 75 -99 SPO 1997 04 06 10 04 322 9.1 -9 688.10 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 10 05 322 9.2 -9 688.10 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 10 06 322 9.1 -9 688.10 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 06 10 07 323 8.4 -9 688.10 -39.1 -39.0 -39.1 75 -99 SPO 1997 04 06 10 08 325 8.3 -9 688.10 -39.1 -39.0 -39.1 76 -99 SPO 1997 04 06 10 09 325 8.3 -9 688.20 -39.1 -39.0 -39.1 76 -99 SPO 1997 04 06 10 10 323 8.2 -9 688.20 -39.1 -39.0 -39.0 76 -99 SPO 1997 04 06 10 11 322 8.3 -9 688.30 -39.0 -38.9 -39.0 76 -99 SPO 1997 04 06 10 12 320 8.3 -9 688.30 -38.9 -38.9 -38.9 75 -99 SPO 1997 04 06 10 13 319 8.4 -9 688.40 -38.9 -38.9 -38.9 75 -99 SPO 1997 04 06 10 14 319 8.5 -9 688.40 -38.8 -38.9 -38.8 76 -99 SPO 1997 04 06 10 15 320 8.5 -9 688.40 -38.8 -38.8 -38.9 76 -99 SPO 1997 04 06 10 16 320 8.5 -9 688.40 -38.8 -38.8 -38.8 76 -99 SPO 1997 04 06 10 17 319 8.5 -9 688.30 -38.8 -38.8 -38.8 76 -99 SPO 1997 04 06 10 18 321 8.7 -9 688.30 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 19 322 8.5 -9 688.30 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 20 322 8.4 -9 688.20 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 21 323 8.9 -9 688.20 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 22 322 8.9 -9 688.20 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 23 322 9.0 -9 688.30 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 24 324 8.4 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 25 324 8.7 -9 688.30 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 26 324 8.6 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 27 325 8.4 -9 688.30 -38.7 -38.7 -38.7 77 -99 SPO 1997 04 06 10 28 325 8.3 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 29 325 8.1 -9 688.30 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 30 326 7.9 -9 688.20 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 31 325 8.1 -9 688.20 -38.7 -38.8 -38.8 79 -99 SPO 1997 04 06 10 32 325 7.9 -9 688.20 -38.7 -38.9 -38.8 77 -99 SPO 1997 04 06 10 33 326 7.9 -9 688.20 -38.7 -38.9 -38.8 77 -99 SPO 1997 04 06 10 34 327 7.5 -9 688.20 -38.7 -38.9 -38.8 76 -99 SPO 1997 04 06 10 35 326 7.8 -9 688.20 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 36 325 7.7 -9 688.20 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 37 325 8.1 -9 688.20 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 10 38 324 7.9 -9 688.20 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 10 39 322 7.9 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 40 322 8.0 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 41 324 8.2 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 42 323 7.9 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 43 327 7.3 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 44 324 7.5 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 45 325 8.2 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 46 324 8.6 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 47 322 8.9 -9 688.00 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 48 323 8.5 -9 688.00 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 49 323 8.3 -9 688.10 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 50 323 8.7 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 51 323 8.9 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 52 322 8.7 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 53 321 8.8 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 54 322 8.9 -9 688.10 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 10 55 320 9.2 -9 688.00 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 10 56 320 9.4 -9 688.00 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 57 319 9.8 -9 688.00 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 58 317 9.8 -9 687.90 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 10 59 317 9.9 -9 687.90 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 11 00 315 9.7 -9 687.90 -38.6 -38.6 -38.5 76 0 SPO 1997 04 06 11 01 316 9.8 -9 688.00 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 06 11 02 316 9.5 -9 688.00 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 06 11 03 317 9.1 -9 688.00 -38.5 -38.6 -38.5 74 -99 SPO 1997 04 06 11 04 317 8.8 -9 688.00 -38.5 -38.6 -38.6 74 -99 SPO 1997 04 06 11 05 317 9.4 -9 688.00 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 11 06 317 9.3 -9 688.00 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 11 07 320 9.0 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 08 319 8.8 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 09 317 9.1 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 10 319 9.1 -9 687.90 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 11 11 318 9.7 -9 687.90 -38.5 -38.4 -38.5 76 -99 SPO 1997 04 06 11 12 318 9.7 -9 687.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 13 319 9.0 -9 687.90 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 14 318 9.4 -9 687.80 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 15 318 9.4 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 16 318 9.7 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 17 316 9.7 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 18 317 8.6 -9 687.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 11 19 319 9.2 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 20 318 8.9 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 21 317 9.0 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 22 316 8.7 -9 687.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 23 318 8.9 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 24 320 9.3 -9 687.80 -38.4 -38.4 -38.5 79 -99 SPO 1997 04 06 11 25 320 8.9 -9 687.80 -38.4 -38.4 -38.4 77 -99 SPO 1997 04 06 11 26 323 9.0 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 27 325 8.6 -9 687.80 -38.3 -38.4 -38.4 78 -99 SPO 1997 04 06 11 28 323 8.6 -9 687.80 -38.4 -38.4 -38.4 79 -99 SPO 1997 04 06 11 29 322 8.9 -9 687.90 -38.4 -38.5 -38.4 77 -99 SPO 1997 04 06 11 30 323 8.7 -9 687.90 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 31 324 8.8 -9 687.90 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 32 321 8.5 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 33 321 8.6 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 34 320 8.9 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 35 321 8.6 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 36 318 9.1 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 37 318 8.7 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 38 320 8.4 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 39 321 8.8 -9 687.80 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 11 40 325 8.7 -9 687.80 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 11 41 324 8.8 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 42 322 8.5 -9 687.80 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 11 43 324 8.9 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 44 322 8.5 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 45 323 8.5 -9 687.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 46 324 8.5 -9 687.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 47 323 9.3 -9 687.70 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 48 322 9.0 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 49 323 9.6 -9 687.60 -38.4 -38.5 -38.5 76 -99 SPO 1997 04 06 11 50 320 8.9 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 51 322 8.8 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 52 323 8.9 -9 687.60 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 11 53 324 8.7 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 54 324 9.0 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 55 324 8.3 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 56 324 8.2 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 57 328 8.0 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 58 329 7.7 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 59 332 7.4 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 12 00 334 7.5 -9 687.70 -38.4 -38.5 -38.6 75 0 SPO 1997 04 06 12 01 334 7.5 -9 687.70 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 02 331 7.8 -9 687.70 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 03 332 7.6 -9 687.80 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 04 335 6.9 -9 687.80 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 05 333 7.3 -9 687.80 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 06 327 7.5 -9 687.80 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 07 328 7.2 -9 687.80 -38.5 -38.6 -38.5 76 -99 SPO 1997 04 06 12 08 331 7.0 -9 687.80 -38.4 -38.6 -38.5 76 -99 SPO 1997 04 06 12 09 335 7.1 -9 687.80 -38.4 -38.6 -38.5 76 -99 SPO 1997 04 06 12 10 338 7.3 -9 687.80 -38.4 -38.7 -38.6 76 -99 SPO 1997 04 06 12 11 337 7.3 -9 687.80 -38.5 -38.7 -38.6 77 -99 SPO 1997 04 06 12 12 336 7.5 -9 687.80 -38.5 -38.8 -38.7 77 -99 SPO 1997 04 06 12 13 338 7.3 -9 687.80 -38.6 -38.8 -38.7 78 -99 SPO 1997 04 06 12 14 339 6.9 -9 687.80 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 15 338 7.4 -9 687.80 -38.6 -38.8 -38.8 76 -99 SPO 1997 04 06 12 16 339 7.2 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 17 340 7.0 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 18 340 7.2 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 19 340 6.8 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 20 341 6.6 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 21 340 6.4 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 22 341 6.6 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 23 343 6.5 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 24 341 7.4 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 25 342 7.3 -9 687.70 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 26 341 7.6 -9 687.70 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 12 27 339 7.2 -9 687.70 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 12 28 339 7.0 -9 687.70 -38.7 -38.7 -38.8 75 -99 SPO 1997 04 06 12 29 336 7.3 -9 687.70 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 12 30 334 7.1 -9 687.60 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 06 12 31 333 7.4 -9 687.60 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 12 32 332 7.7 -9 687.60 -38.7 -38.8 -38.7 76 -99 SPO 1997 04 06 12 33 332 7.5 -9 687.60 -38.7 -38.8 -38.7 76 -99 SPO 1997 04 06 12 34 330 7.7 -9 687.60 -38.6 -38.8 -38.7 75 -99 SPO 1997 04 06 12 35 329 7.8 -9 687.60 -38.6 -38.8 -38.7 75 -99 SPO 1997 04 06 12 36 328 7.7 -9 687.60 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 37 325 7.7 -9 687.60 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 38 327 7.9 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 39 327 8.0 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 40 326 7.6 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 41 325 7.8 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 42 324 7.5 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 43 323 7.7 -9 687.70 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 44 323 7.9 -9 687.70 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 12 45 323 7.7 -9 687.70 -38.6 -38.6 -38.6 75 -99 SPO 1997 04 06 12 46 320 7.3 -9 687.70 -38.6 -38.6 -38.7 76 -99 SPO 1997 04 06 12 47 321 7.6 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 48 321 7.5 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 49 321 7.6 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 50 319 7.8 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 51 319 8.0 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 52 318 7.9 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 53 317 7.7 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 54 316 8.0 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 55 316 7.9 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 56 314 7.9 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 57 314 7.8 -9 687.60 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 58 315 7.8 -9 687.60 -38.5 -38.7 -38.6 76 -99 SPO 1997 04 06 12 59 315 8.4 -9 687.60 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 13 00 313 8.7 -9 687.60 -38.5 -38.6 -38.6 77 0 SPO 1997 04 06 13 01 312 8.7 -9 687.60 -38.5 -38.6 -38.5 77 -99 SPO 1997 04 06 13 02 311 8.1 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 03 310 8.2 -9 687.60 -38.5 -38.5 -38.6 77 -99 SPO 1997 04 06 13 04 309 7.7 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 05 309 8.2 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 06 308 8.0 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 13 07 310 8.1 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 13 08 310 8.6 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 13 09 309 7.9 -9 687.60 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 10 310 7.8 -9 687.60 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 11 310 7.7 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 12 312 8.3 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 13 313 8.4 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 14 311 8.6 -9 687.40 -38.3 -38.2 -38.3 76 -99 SPO 1997 04 06 13 15 311 8.4 -9 687.40 -38.3 -38.2 -38.3 76 -99 SPO 1997 04 06 13 16 310 8.2 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 13 17 312 8.1 -9 687.40 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 13 18 310 8.6 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 13 19 309 8.3 -9 687.40 -38.2 -38.2 -38.3 77 -99 SPO 1997 04 06 13 20 310 8.3 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 13 21 310 8.7 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 13 22 308 8.5 -9 687.40 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 13 23 308 8.6 -9 687.40 -38.2 -38.2 -38.2 77 -99 SPO 1997 04 06 13 24 306 9.1 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 13 25 307 9.3 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 26 307 9.3 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 27 308 9.1 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 28 307 9.1 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 29 306 9.3 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 30 306 9.1 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 31 305 8.8 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 13 32 306 9.2 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 33 306 8.8 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 34 306 9.2 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 35 306 9.1 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 36 305 8.6 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 37 305 9.5 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 38 305 9.7 -9 687.40 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 13 39 304 9.6 -9 687.40 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 13 40 305 9.4 -9 687.40 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 41 305 9.0 -9 687.40 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 42 304 9.2 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 43 304 9.4 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 44 304 9.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 45 304 9.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 46 303 9.6 -9 687.50 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 47 304 9.4 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 48 303 9.7 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 49 303 9.2 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 50 303 9.5 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 51 304 9.4 -9 687.30 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 52 303 9.6 -9 687.30 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 53 304 9.3 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 13 54 303 9.4 -9 687.30 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 55 303 9.6 -9 687.30 -38.0 -37.9 -38.0 76 -99 SPO 1997 04 06 13 56 304 9.1 -9 687.30 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 13 57 304 8.9 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 13 58 305 8.9 -9 687.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 59 306 8.9 -9 687.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 14 00 307 9.0 -9 687.30 -38.0 -38.0 -38.1 77 0 SPO 1997 04 06 14 01 307 9.2 -9 687.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 02 307 9.4 -9 687.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 03 308 9.1 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 04 308 9.4 -9 687.30 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 05 308 9.0 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 06 309 9.0 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 07 307 8.9 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 08 308 8.7 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 09 309 9.3 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 10 310 8.8 -9 687.20 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 11 311 8.7 -9 687.30 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 12 311 8.6 -9 687.30 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 13 310 8.5 -9 687.30 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 14 312 8.2 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 15 313 8.3 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 16 312 8.5 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 17 312 8.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 18 311 8.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 19 311 7.9 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 20 313 7.7 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 21 315 7.5 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 22 314 7.6 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 23 315 7.8 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 24 315 8.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 25 317 8.1 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 26 317 8.1 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 27 317 7.8 -9 687.30 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 14 28 318 7.6 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 29 317 7.5 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 30 317 8.2 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 31 316 7.5 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 32 316 7.8 -9 687.30 -38.0 -38.2 -38.1 77 -99 SPO 1997 04 06 14 33 315 7.5 -9 687.20 -38.0 -38.2 -38.1 77 -99 SPO 1997 04 06 14 34 314 8.2 -9 687.20 -38.1 -38.2 -38.1 78 -99 SPO 1997 04 06 14 35 314 8.0 -9 687.20 -38.1 -38.2 -38.1 78 -99 SPO 1997 04 06 14 36 314 8.2 -9 687.30 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 37 314 8.3 -9 687.20 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 38 315 8.0 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 39 315 7.5 -9 687.30 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 40 316 7.5 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 41 315 7.8 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 42 315 7.3 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 43 314 7.6 -9 687.40 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 44 315 7.3 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 45 313 7.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 46 313 7.3 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 47 313 7.1 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 48 311 7.2 -9 687.60 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 14 49 310 7.3 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 50 308 6.9 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 51 307 7.4 -9 687.60 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 52 308 6.9 -9 687.60 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 53 306 7.2 -9 687.60 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 14 54 306 7.7 -9 687.60 -37.9 -37.9 -37.9 75 -99 SPO 1997 04 06 14 55 306 7.5 -9 687.60 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 14 56 309 7.4 -9 687.50 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 14 57 309 7.3 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 58 308 7.3 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 59 309 7.2 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 15 00 309 7.5 -9 687.60 -37.9 -38.1 -38.0 77 0 SPO 1997 04 06 15 01 310 7.1 -9 687.60 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 15 02 310 6.9 -9 687.60 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 03 310 7.4 -9 687.60 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 04 310 7.5 -9 687.60 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 05 310 7.3 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 06 312 7.4 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 07 312 7.3 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 08 312 7.4 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 09 312 7.2 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 10 313 7.2 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 11 311 7.3 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 12 312 7.2 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 13 312 7.3 -9 687.60 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 15 14 311 7.1 -9 687.60 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 15 311 6.8 -9 687.60 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 16 311 6.8 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 17 311 7.4 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 18 313 7.0 -9 687.50 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 19 313 6.6 -9 687.50 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 20 312 6.7 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 21 311 7.1 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 22 309 6.9 -9 687.50 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 23 309 7.2 -9 687.50 -38.1 -38.1 -38.0 78 -99 SPO 1997 04 06 15 24 308 7.8 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 15 25 307 8.0 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 26 308 7.7 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 15 27 310 7.4 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 28 309 8.0 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 29 311 7.3 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 30 311 7.8 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 31 311 7.8 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 32 313 7.5 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 33 313 7.7 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 34 315 7.5 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 35 317 7.2 -9 687.50 -38.1 -38.2 -38.2 78 -99 SPO 1997 04 06 15 36 317 7.7 -9 687.50 -38.1 -38.2 -38.2 78 -99 SPO 1997 04 06 15 37 316 7.4 -9 687.50 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 15 38 316 7.9 -9 687.50 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 15 39 316 7.4 -9 687.50 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 15 40 317 7.6 -9 687.50 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 15 41 318 7.6 -9 687.50 -38.1 -38.1 -38.2 77 -99 SPO 1997 04 06 15 42 319 7.6 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 15 43 319 7.9 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 15 44 321 8.0 -9 687.40 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 15 45 321 7.8 -9 687.40 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 15 46 319 8.3 -9 687.30 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 15 47 319 8.1 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 15 48 317 8.0 -9 687.30 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 15 49 315 8.3 -9 687.30 -38.2 -38.4 -38.3 76 -99 SPO 1997 04 06 15 50 315 8.3 -9 687.30 -38.2 -38.4 -38.3 76 -99 SPO 1997 04 06 15 51 314 8.5 -9 687.30 -38.2 -38.4 -38.3 77 -99 SPO 1997 04 06 15 52 314 8.2 -9 687.30 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 15 53 315 8.4 -9 687.20 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 15 54 314 8.5 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 55 314 8.2 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 56 313 8.4 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 57 312 8.0 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 58 312 7.9 -9 687.30 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 15 59 314 8.0 -9 687.30 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 00 314 7.7 -9 687.40 -38.2 -38.3 -38.3 77 0 SPO 1997 04 06 16 01 314 8.0 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 02 314 7.6 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 03 315 7.8 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 04 315 7.4 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 05 314 7.5 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 06 314 7.6 -9 687.40 -38.3 -38.2 -38.3 78 -99 SPO 1997 04 06 16 07 314 7.3 -9 687.40 -38.3 -38.2 -38.3 77 -99 SPO 1997 04 06 16 08 313 7.3 -9 687.40 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 09 312 7.3 -9 687.50 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 10 312 7.5 -9 687.50 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 16 11 312 7.2 -9 687.50 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 16 12 312 7.5 -9 687.50 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 13 311 7.6 -9 687.50 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 14 310 7.6 -9 687.40 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 15 310 7.4 -9 687.40 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 16 310 8.1 -9 687.40 -38.3 -38.4 -38.3 78 -99 SPO 1997 04 06 16 17 308 7.7 -9 687.40 -38.2 -38.2 -38.3 77 -99 SPO 1997 04 06 16 18 306 7.8 -9 687.40 -38.3 -38.3 -38.3 78 -99 SPO 1997 04 06 16 19 307 7.7 -9 687.40 -38.3 -38.3 -38.3 78 -99 SPO 1997 04 06 16 20 307 8.2 -9 687.40 -38.3 -38.2 -38.3 77 -99 SPO 1997 04 06 16 21 307 8.0 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 22 306 7.9 -9 687.40 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 16 23 307 7.9 -9 687.40 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 16 24 307 7.9 -9 687.40 -38.2 -38.2 -38.2 77 -99 SPO 1997 04 06 16 25 308 8.2 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 26 308 7.9 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 27 307 8.2 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 28 307 7.9 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 29 306 8.3 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 30 306 8.2 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 31 306 8.3 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 32 306 7.9 -9 687.30 -38.2 -38.2 -38.4 75 -99 SPO 1997 04 06 16 33 306 8.4 -9 687.30 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 16 34 308 8.6 -9 687.30 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 16 35 312 7.9 -9 687.30 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 16 36 311 8.0 -9 687.30 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 16 37 309 7.4 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 38 307 8.2 -9 687.40 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 16 39 308 7.5 -9 687.30 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 16 40 308 7.7 -9 687.30 -38.3 -38.4 -38.5 76 -99 SPO 1997 04 06 16 41 308 7.8 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 42 308 7.5 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 43 309 7.6 -9 687.40 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 44 308 7.8 -9 687.40 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 45 307 7.8 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 46 307 7.6 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 47 307 7.6 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 48 306 8.0 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 49 306 7.9 -9 687.30 -38.4 -38.3 -38.4 76 -99 SPO 1997 04 06 16 50 305 8.3 -9 687.30 -38.4 -38.3 -38.4 76 -99 SPO 1997 04 06 16 51 304 8.2 -9 687.30 -38.3 -38.2 -38.4 74 -99 SPO 1997 04 06 16 52 301 8.8 -9 687.30 -38.3 -38.2 -38.3 74 -99 SPO 1997 04 06 16 53 302 8.6 -9 687.20 -38.3 -38.1 -38.3 76 -99 SPO 1997 04 06 16 54 302 8.8 -9 687.20 -38.2 -38.1 -38.2 75 -99 SPO 1997 04 06 16 55 302 8.1 -9 687.20 -38.2 -38.1 -38.2 75 -99 SPO 1997 04 06 16 56 303 8.2 -9 687.20 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 57 304 8.2 -9 687.20 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 58 306 7.8 -9 687.20 -38.2 -38.4 -38.4 77 -99 SPO 1997 04 06 16 59 304 7.7 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 00 304 8.0 -9 687.20 -38.3 -38.4 -38.4 77 0 SPO 1997 04 06 17 01 304 7.9 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 02 303 7.8 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 03 301 8.3 -9 687.20 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 17 04 300 8.7 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 05 302 8.2 -9 687.20 -38.2 -38.2 -38.2 75 -99 SPO 1997 04 06 17 06 303 7.7 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 07 301 7.9 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 08 303 7.5 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 09 303 8.0 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 10 306 8.2 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 11 306 8.3 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 12 309 7.6 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 13 307 8.0 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 14 307 7.8 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 15 307 7.9 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 16 307 7.3 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 17 308 7.5 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 18 307 6.9 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 19 306 7.0 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 20 305 7.2 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 21 305 7.0 -9 687.30 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 22 304 7.0 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 23 304 7.2 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 17 24 301 7.3 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 17 25 300 7.1 -9 687.30 -38.2 -38.2 -38.1 76 -99 SPO 1997 04 06 17 26 300 7.9 -9 687.30 -38.2 -38.2 -38.1 77 -99 SPO 1997 04 06 17 27 302 7.2 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 28 304 7.1 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 29 303 6.7 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 30 302 7.0 -9 687.30 -38.0 -38.2 -38.1 74 -99 SPO 1997 04 06 17 31 302 7.0 -9 687.20 -38.0 -38.2 -38.1 74 -99 SPO 1997 04 06 17 32 302 7.4 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 33 300 7.5 -9 687.30 -38.0 -38.1 -38.0 74 -99 SPO 1997 04 06 17 34 299 7.2 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 35 300 7.6 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 36 302 7.4 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 37 301 7.3 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 38 299 7.6 -9 687.20 -38.0 -38.0 -38.0 74 -99 SPO 1997 04 06 17 39 300 7.7 -9 687.30 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 17 40 301 7.6 -9 687.30 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 17 41 301 7.4 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 42 302 7.4 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 43 304 6.8 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 44 302 6.7 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 45 302 6.9 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 46 303 6.9 -9 687.30 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 17 47 301 6.9 -9 687.30 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 17 48 301 7.2 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 49 299 7.0 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 50 300 6.8 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 51 299 7.3 -9 687.20 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 17 52 300 7.2 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 53 298 7.3 -9 687.30 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 17 54 298 7.3 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 55 298 7.1 -9 687.20 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 56 299 6.8 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 57 298 7.1 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 58 297 7.1 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 59 298 7.4 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 00 298 7.6 -9 687.20 -38.0 -38.1 -38.1 77 0 SPO 1997 04 06 18 01 301 7.5 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 02 302 7.4 -9 687.20 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 18 03 302 7.4 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 04 301 7.7 -9 687.20 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 18 05 302 7.7 -9 687.20 -38.1 -38.2 -38.2 75 -99 SPO 1997 04 06 18 06 302 8.0 -9 687.10 -38.1 -38.2 -38.2 74 -99 SPO 1997 04 06 18 07 301 8.0 -9 687.10 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 18 08 301 7.9 -9 687.10 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 09 300 7.9 -9 687.10 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 10 299 7.8 -9 687.10 -38.2 -38.4 -38.4 75 -99 SPO 1997 04 06 18 11 298 7.9 -9 687.10 -38.2 -38.4 -38.4 75 -99 SPO 1997 04 06 18 12 298 7.9 -9 687.10 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 13 297 7.8 -9 687.10 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 18 14 298 8.1 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 15 299 7.6 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 16 299 8.2 -9 687.00 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 18 17 299 8.4 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 18 297 8.3 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 19 300 8.7 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 20 299 8.6 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 21 298 8.6 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 22 297 8.9 -9 687.00 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 23 298 8.8 -9 686.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 24 299 8.7 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 25 299 8.7 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 26 301 8.3 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 27 301 8.3 -9 686.90 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 28 302 8.0 -9 686.90 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 29 303 8.0 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 30 303 8.2 -9 686.90 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 18 31 302 8.2 -9 686.90 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 18 32 303 8.0 -9 686.90 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 18 33 301 8.0 -9 686.90 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 18 34 301 8.3 -9 686.90 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 35 301 8.0 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 36 300 8.5 -9 686.80 -38.4 -38.6 -38.5 75 -99 SPO 1997 04 06 18 37 300 8.8 -9 686.80 -38.4 -38.6 -38.4 76 -99 SPO 1997 04 06 18 38 299 8.2 -9 686.80 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 18 39 298 8.7 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 40 298 8.3 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 41 300 8.5 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 42 300 8.8 -9 686.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 43 297 8.9 -9 686.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 44 299 8.8 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 45 298 8.3 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 46 298 8.4 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 47 298 8.7 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 48 297 8.4 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 49 297 8.6 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 50 297 8.7 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 51 297 8.4 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 52 296 8.6 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 53 296 8.8 -9 686.70 -38.3 -38.4 -38.3 74 -99 SPO 1997 04 06 18 54 297 8.8 -9 686.60 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 18 55 295 8.6 -9 686.60 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 18 56 295 8.7 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 57 295 9.1 -9 686.60 -38.2 -38.3 -38.3 73 -99 SPO 1997 04 06 18 58 296 9.0 -9 686.60 -38.2 -38.4 -38.3 73 -99 SPO 1997 04 06 18 59 296 8.8 -9 686.60 -38.2 -38.4 -38.2 73 -99 SPO 1997 04 06 19 00 296 8.9 -9 686.60 -38.2 -38.4 -38.3 75 0 SPO 1997 04 06 19 01 296 8.8 -9 686.60 -38.2 -38.4 -38.2 75 -99 SPO 1997 04 06 19 02 295 9.0 -9 686.60 -38.2 -38.4 -38.2 75 -99 SPO 1997 04 06 19 03 295 8.9 -9 686.50 -38.1 -38.3 -38.2 74 -99 SPO 1997 04 06 19 04 294 9.4 -9 686.50 -38.2 -38.2 -38.2 73 -99 SPO 1997 04 06 19 05 295 9.1 -9 686.50 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 06 296 8.9 -9 686.50 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 07 295 9.5 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 08 295 8.7 -9 686.50 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 09 295 9.3 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 10 292 9.3 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 11 291 8.9 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 12 293 8.9 -9 686.60 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 13 294 8.6 -9 686.70 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 14 294 8.9 -9 686.70 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 15 292 9.0 -9 686.70 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 16 296 8.5 -9 686.70 -38.1 -38.3 -38.2 74 -99 SPO 1997 04 06 19 17 296 8.6 -9 686.70 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 18 296 8.5 -9 686.70 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 19 296 8.3 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 20 297 8.2 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 21 297 8.6 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 22 296 8.9 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 23 296 8.8 -9 686.60 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 19 24 295 8.6 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 25 294 8.8 -9 686.70 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 26 294 8.3 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 27 295 8.5 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 28 293 8.1 -9 686.60 -38.2 -38.4 -38.2 77 -99 SPO 1997 04 06 19 29 294 8.6 -9 686.60 -38.2 -38.4 -38.2 77 -99 SPO 1997 04 06 19 30 294 8.6 -9 686.60 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 19 31 292 8.5 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 32 292 8.3 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 33 291 8.6 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 34 290 8.4 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 35 293 8.1 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 36 294 8.7 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 37 296 8.3 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 38 295 8.5 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 39 295 8.7 -9 686.60 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 19 40 296 8.1 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 41 296 8.3 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 42 297 7.9 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 43 296 7.8 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 44 296 7.9 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 45 296 8.0 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 46 298 7.8 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 19 47 296 7.7 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 19 48 297 8.1 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 19 49 296 8.3 -9 686.70 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 19 50 294 8.2 -9 686.70 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 19 51 295 8.2 -9 686.70 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 19 52 294 7.9 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 53 294 8.1 -9 686.70 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 19 54 293 7.6 -9 686.70 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 19 55 293 8.0 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 56 293 8.2 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 57 292 7.9 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 58 292 7.8 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 59 292 7.5 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 00 292 7.7 -9 686.70 -38.2 -38.3 -38.2 75 0 SPO 1997 04 06 20 01 293 7.5 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 02 293 7.9 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 03 295 7.7 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 04 296 7.3 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 05 296 7.3 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 06 297 7.4 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 07 297 7.3 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 08 297 7.5 -9 686.60 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 09 298 7.6 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 10 297 7.4 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 11 297 7.2 -9 686.80 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 20 12 296 6.8 -9 686.80 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 20 13 296 7.0 -9 686.80 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 20 14 295 6.8 -9 686.80 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 20 15 294 7.3 -9 686.80 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 20 16 297 6.9 -9 686.80 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 20 17 292 7.9 -9 686.80 -38.0 -38.2 -38.0 76 -99 SPO 1997 04 06 20 18 294 7.2 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 19 292 7.0 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 20 293 7.0 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 21 294 7.1 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 22 295 7.3 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 23 294 7.2 -9 686.80 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 20 24 294 7.5 -9 686.80 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 20 25 293 7.9 -9 686.80 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 20 26 292 7.0 -9 686.80 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 27 291 7.3 -9 686.80 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 28 293 7.2 -9 686.70 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 29 291 7.5 -9 686.70 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 20 30 289 7.2 -9 686.70 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 20 31 290 7.1 -9 686.70 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 32 291 7.5 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 33 290 7.2 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 34 291 7.2 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 35 291 7.7 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 36 291 7.0 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 37 291 7.2 -9 686.70 -37.8 -38.0 -37.8 76 -99 SPO 1997 04 06 20 38 291 7.6 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 39 291 7.2 -9 686.70 -37.8 -38.0 -37.8 76 -99 SPO 1997 04 06 20 40 292 7.2 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 41 293 7.3 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 42 292 7.2 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 43 295 7.4 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 44 294 7.2 -9 686.70 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 20 45 295 7.0 -9 686.70 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 20 46 297 7.1 -9 686.70 -37.9 -37.9 -37.9 73 -99 SPO 1997 04 06 20 47 295 7.2 -9 686.70 -37.8 -37.9 -37.9 73 -99 SPO 1997 04 06 20 48 296 7.4 -9 686.70 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 20 49 295 7.1 -9 686.70 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 20 50 296 7.0 -9 686.60 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 20 51 298 7.3 -9 686.60 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 52 300 7.1 -9 686.60 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 53 301 7.0 -9 686.50 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 54 303 7.1 -9 686.60 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 55 305 6.6 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 56 306 6.8 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 57 307 6.9 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 58 308 7.2 -9 686.50 -37.8 -37.8 -37.9 77 -99 SPO 1997 04 06 20 59 310 6.8 -9 686.40 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 00 306 7.0 -9 686.40 -37.8 -37.8 -37.9 74 0 SPO 1997 04 06 21 01 305 6.6 -9 686.40 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 02 302 6.2 -9 686.50 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 21 03 304 6.5 -9 686.50 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 21 04 304 6.4 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 05 304 6.3 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 06 303 6.5 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 07 303 6.6 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 08 304 6.8 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 09 308 6.5 -9 686.50 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 21 10 307 6.8 -9 686.40 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 21 11 306 6.5 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 12 305 6.4 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 13 305 6.7 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 14 304 7.2 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 15 304 7.3 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 16 304 7.2 -9 686.30 -37.8 -37.8 -37.9 74 -99 SPO 1997 04 06 21 17 302 7.5 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 18 305 7.2 -9 686.30 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 19 305 7.5 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 20 304 7.6 -9 686.40 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 21 304 7.5 -9 686.40 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 22 305 7.3 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 23 306 7.2 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 24 306 7.5 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 25 304 7.4 -9 686.40 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 26 305 7.4 -9 686.40 -37.8 -37.9 -37.8 76 -99 SPO 1997 04 06 21 27 304 7.4 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 28 306 7.1 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 29 305 7.2 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 30 305 7.4 -9 686.30 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 31 305 7.1 -9 686.30 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 32 306 7.3 -9 686.40 -37.9 -37.9 -37.9 75 -99 SPO 1997 04 06 21 33 304 7.2 -9 686.40 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 21 34 303 7.2 -9 686.40 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 35 305 7.5 -9 686.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 21 36 307 7.4 -9 686.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 37 309 7.6 -9 686.30 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 21 38 308 7.4 -9 686.30 -38.0 -37.9 -38.0 76 -99 SPO 1997 04 06 21 39 307 7.5 -9 686.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 40 307 7.4 -9 686.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 21 41 306 7.2 -9 686.30 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 42 306 6.8 -9 686.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 43 307 7.3 -9 686.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 44 307 7.6 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 45 306 7.6 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 46 305 7.5 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 47 306 7.5 -9 686.30 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 21 48 306 7.5 -9 686.30 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 21 49 307 7.5 -9 686.20 -38.1 -37.9 -38.1 77 -99 SPO 1997 04 06 21 50 308 7.5 -9 686.20 -38.1 -38.0 -38.1 78 -99 SPO 1997 04 06 21 51 308 7.5 -9 686.20 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 21 52 311 7.3 -9 686.20 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 21 53 315 7.5 -9 686.10 -38.1 -38.1 -38.2 77 -99 SPO 1997 04 06 21 54 315 7.4 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 55 316 7.2 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 56 316 7.6 -9 686.00 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 57 315 7.6 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 58 314 7.7 -9 686.10 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 21 59 314 8.0 -9 686.10 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 22 00 313 7.8 -9 686.10 -38.0 -38.0 -38.1 74 0 SPO 1997 04 06 22 01 312 7.7 -9 686.10 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 22 02 311 7.5 -9 686.10 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 22 03 308 7.7 -9 686.10 -38.0 -38.0 -38.1 74 -99 SPO 1997 04 06 22 04 306 8.2 -9 686.00 -38.0 -37.9 -38.0 74 -99 SPO 1997 04 06 22 05 306 8.2 -9 686.00 -38.0 -37.8 -38.0 76 -99 SPO 1997 04 06 22 06 303 8.4 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 07 303 8.1 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 08 303 8.3 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 09 306 8.3 -9 686.10 -37.9 -37.8 -37.9 77 -99 SPO 1997 04 06 22 10 308 8.1 -9 686.10 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 22 11 309 8.2 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 12 311 7.7 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 13 310 7.0 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 14 311 7.3 -9 686.10 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 22 15 313 7.4 -9 686.10 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 16 315 7.5 -9 686.00 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 17 317 7.7 -9 686.00 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 18 317 7.3 -9 686.00 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 22 19 316 7.3 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 20 318 7.4 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 21 320 7.4 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 22 323 7.8 -9 685.90 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 22 23 320 7.5 -9 685.90 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 22 24 317 7.4 -9 686.00 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 22 25 314 7.1 -9 686.10 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 22 26 314 7.0 -9 686.10 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 22 27 315 7.2 -9 686.10 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 28 317 7.0 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 29 319 6.9 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 30 320 6.9 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 31 321 6.5 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 32 321 6.7 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 33 321 6.8 -9 686.10 -37.9 -38.0 -38.1 77 -99 SPO 1997 04 06 22 34 320 6.8 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 35 321 6.2 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 36 321 6.3 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 37 325 6.4 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 38 323 6.6 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 39 325 6.6 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 40 325 7.1 -9 686.10 -37.9 -38.1 -38.0 -99 -99 SPO 1997 04 06 22 41 325 7.1 -9 686.00 -37.8 -38.1 -37.9 74 -99 SPO 1997 04 06 22 42 322 6.9 -9 686.00 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 22 43 318 6.7 -9 686.10 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 22 44 317 6.7 -9 686.10 -37.8 -38.0 -37.9 73 -99 SPO 1997 04 06 22 45 317 7.1 -9 686.10 -37.8 -37.9 -37.9 73 -99 SPO 1997 04 06 22 46 316 6.9 -9 686.10 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 47 315 6.7 -9 686.10 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 48 315 6.4 -9 686.20 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 49 315 6.5 -9 686.10 -37.8 -37.9 -37.8 73 -99 SPO 1997 04 06 22 50 315 6.6 -9 686.10 -37.7 -37.9 -37.8 72 -99 SPO 1997 04 06 22 51 318 6.5 -9 686.10 -37.7 -37.9 -37.8 72 -99 SPO 1997 04 06 22 52 318 6.6 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 53 313 6.6 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 54 312 6.3 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 55 310 6.6 -9 686.20 -37.7 -37.8 -37.8 73 -99 SPO 1997 04 06 22 56 311 6.3 -9 686.20 -37.7 -37.8 -37.7 73 -99 SPO 1997 04 06 22 57 311 6.7 -9 686.10 -37.7 -37.8 -37.8 73 -99 SPO 1997 04 06 22 58 313 7.0 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 22 59 314 7.0 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 00 313 6.5 -9 686.10 -37.6 -37.8 -37.7 71 0 SPO 1997 04 06 23 01 315 6.5 -9 686.10 -37.6 -37.8 -37.7 71 -99 SPO 1997 04 06 23 02 313 6.6 -9 686.10 -37.7 -37.8 -37.7 72 -99 SPO 1997 04 06 23 03 311 7.0 -9 686.10 -37.7 -37.8 -37.7 73 -99 SPO 1997 04 06 23 04 314 6.6 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 05 313 6.4 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 06 311 6.4 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 07 311 6.6 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 08 310 6.7 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 09 310 6.8 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 10 311 6.5 -9 686.10 -37.6 -37.9 -37.7 74 -99 SPO 1997 04 06 23 11 311 6.3 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 12 313 6.2 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 13 316 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 14 316 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 15 317 6.4 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 16 317 6.6 -9 686.10 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 06 23 17 317 6.5 -9 686.10 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 06 23 18 317 6.5 -9 686.10 -37.5 -37.8 -37.6 72 -99 SPO 1997 04 06 23 19 318 6.3 -9 686.10 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 06 23 20 317 6.3 -9 686.10 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 06 23 21 318 6.4 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 22 318 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 23 318 6.4 -9 686.10 -37.6 -37.8 -37.7 74 -99 SPO 1997 04 06 23 24 317 6.9 -9 686.10 -37.6 -37.7 -37.7 74 -99 SPO 1997 04 06 23 25 316 6.8 -9 686.10 -37.6 -37.7 -37.6 74 -99 SPO 1997 04 06 23 26 318 6.6 -9 686.00 -37.5 -37.6 -37.6 74 -99 SPO 1997 04 06 23 27 317 7.0 -9 686.00 -37.5 -37.6 -37.6 74 -99 SPO 1997 04 06 23 28 318 6.9 -9 686.00 -37.5 -37.6 -37.5 74 -99 SPO 1997 04 06 23 29 317 7.2 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 30 315 7.1 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 31 314 6.7 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 32 314 6.4 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 33 313 6.5 -9 686.00 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 06 23 34 314 6.8 -9 686.00 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 06 23 35 314 6.9 -9 686.10 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 36 313 6.8 -9 686.10 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 06 23 37 315 6.8 -9 686.00 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 06 23 38 315 7.2 -9 686.00 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 06 23 39 314 7.0 -9 686.00 -37.5 -37.6 -37.5 76 -99 SPO 1997 04 06 23 40 315 7.0 -9 686.00 -37.5 -37.6 -37.5 76 -99 SPO 1997 04 06 23 41 313 7.3 -9 686.00 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 42 312 7.4 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 43 311 7.2 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 44 311 7.4 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 45 312 7.1 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 46 311 7.4 -9 686.00 -37.4 -37.5 -37.4 73 -99 SPO 1997 04 06 23 47 313 7.3 -9 686.00 -37.4 -37.5 -37.4 73 -99 SPO 1997 04 06 23 48 315 7.1 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 49 315 7.8 -9 686.00 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 50 316 7.8 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 51 317 7.7 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 52 318 7.3 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 53 315 7.2 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 54 317 7.0 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 55 320 7.2 -9 685.90 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 06 23 56 319 7.0 -9 685.90 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 06 23 57 316 6.5 -9 686.10 -37.5 -37.8 -37.5 -99 -99 SPO 1997 04 06 23 58 315 7.0 -9 686.10 -37.5 -37.8 -37.6 -99 -99 SPO 1997 04 06 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 00 00 313 7.7 -9 686.00 -37.5 -37.8 -37.6 -99 0 SPO 1997 04 07 00 01 312 7.3 -9 686.00 -37.5 -37.8 -37.6 -99 -99 SPO 1997 04 07 00 02 310 7.2 -9 686.00 -37.5 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 03 309 7.4 -9 685.90 -37.5 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 04 313 7.2 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 05 314 7.0 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 06 315 7.2 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 07 314 7.0 -9 685.90 -37.3 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 08 312 7.0 -9 685.90 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 09 313 7.2 -9 686.00 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 10 312 6.8 -9 685.90 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 11 313 6.5 -9 685.90 -37.4 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 12 313 6.9 -9 685.90 -37.4 -37.7 -37.6 -99 -99 SPO 1997 04 07 00 13 314 7.2 -9 685.90 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 00 14 313 7.3 -9 685.90 -37.5 -37.7 -37.6 72 -99 SPO 1997 04 07 00 15 312 7.3 -9 685.90 -37.5 -37.7 -37.6 71 -99 SPO 1997 04 07 00 16 311 7.4 -9 685.90 -37.5 -37.7 -37.6 71 -99 SPO 1997 04 07 00 17 312 7.7 -9 685.90 -37.5 -37.7 -37.6 72 -99 SPO 1997 04 07 00 18 312 7.7 -9 685.80 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 00 19 312 7.8 -9 685.80 -37.5 -37.8 -37.6 73 -99 SPO 1997 04 07 00 20 311 7.8 -9 685.80 -37.4 -37.8 -37.6 73 -99 SPO 1997 04 07 00 21 310 7.9 -9 685.80 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 07 00 22 310 7.8 -9 685.80 -37.5 -37.8 -37.5 74 -99 SPO 1997 04 07 00 23 312 7.7 -9 685.80 -37.5 -37.8 -37.5 73 -99 SPO 1997 04 07 00 24 310 7.8 -9 685.80 -37.4 -37.8 -37.5 73 -99 SPO 1997 04 07 00 25 309 8.0 -9 685.80 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 07 00 26 310 8.0 -9 685.80 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 07 00 27 310 8.0 -9 685.80 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 28 310 8.1 -9 685.70 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 29 310 7.7 -9 685.70 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 30 309 7.7 -9 685.70 -37.4 -37.5 -37.4 74 -99 SPO 1997 04 07 00 31 307 8.0 -9 685.70 -37.4 -37.4 -37.4 74 -99 SPO 1997 04 07 00 32 308 7.9 -9 685.70 -37.3 -37.4 -37.3 73 -99 SPO 1997 04 07 00 33 308 8.0 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 34 308 8.0 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 35 308 7.8 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 36 308 8.1 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 37 311 8.2 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 38 311 7.7 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 39 311 7.9 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 40 313 7.9 -9 685.60 -37.2 -37.4 -37.4 73 -99 SPO 1997 04 07 00 41 310 7.9 -9 685.70 -37.2 -37.4 -37.3 72 -99 SPO 1997 04 07 00 42 310 7.8 -9 685.60 -37.2 -37.4 -37.3 72 -99 SPO 1997 04 07 00 43 311 8.1 -9 685.60 -37.2 -37.4 -37.3 71 -99 SPO 1997 04 07 00 44 311 7.3 -9 685.60 -37.2 -37.5 -37.3 72 -99 SPO 1997 04 07 00 45 312 7.7 -9 685.60 -37.2 -37.5 -37.3 72 -99 SPO 1997 04 07 00 46 311 7.9 -9 685.60 -37.3 -37.6 -37.3 73 -99 SPO 1997 04 07 00 47 311 7.8 -9 685.60 -37.3 -37.6 -37.3 73 -99 SPO 1997 04 07 00 48 310 7.7 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 49 311 7.9 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 50 310 7.6 -9 685.70 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 51 309 7.9 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 52 311 7.8 -9 685.60 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 07 00 53 312 7.9 -9 685.60 -37.3 -37.6 -37.4 74 -99 SPO 1997 04 07 00 54 313 7.6 -9 685.60 -37.3 -37.6 -37.4 74 -99 SPO 1997 04 07 00 55 312 8.0 -9 685.60 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 07 00 56 312 8.4 -9 685.60 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 07 00 57 311 7.8 -9 685.60 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 07 00 58 312 7.8 -9 685.60 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 07 00 59 312 7.9 -9 685.60 -37.4 -37.7 -37.5 72 -99 SPO 1997 04 07 01 00 311 7.8 -9 685.60 -37.4 -37.7 -37.5 71 0 SPO 1997 04 07 01 01 313 7.7 -9 685.70 -37.4 -37.7 -37.6 72 -99 SPO 1997 04 07 01 02 313 7.7 -9 685.70 -37.5 -37.7 -37.6 74 -99 SPO 1997 04 07 01 03 314 7.4 -9 685.70 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 01 04 314 7.4 -9 685.60 -37.5 -37.8 -37.6 72 -99 SPO 1997 04 07 01 05 314 7.9 -9 685.60 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 07 01 06 314 8.1 -9 685.60 -37.5 -37.8 -37.7 73 -99 SPO 1997 04 07 01 07 313 7.6 -9 685.60 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 07 01 08 316 7.7 -9 685.60 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 07 01 09 314 8.2 -9 685.60 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 07 01 10 316 8.0 -9 685.60 -37.6 -38.0 -37.8 73 -99 SPO 1997 04 07 01 11 317 8.2 -9 685.50 -37.7 -38.0 -37.8 73 -99 SPO 1997 04 07 01 12 314 7.6 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 13 316 7.9 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 14 314 7.9 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 15 313 7.1 -9 685.60 -37.8 -38.1 -37.8 73 -99 SPO 1997 04 07 01 16 315 7.9 -9 685.60 -37.8 -38.1 -37.8 73 -99 SPO 1997 04 07 01 17 315 7.4 -9 685.50 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 18 315 7.4 -9 685.50 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 19 315 8.3 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 20 317 8.3 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 21 317 8.6 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 22 316 8.4 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 23 317 8.3 -9 685.40 -37.8 -38.1 -37.9 72 -99 SPO 1997 04 07 01 24 315 8.8 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 25 317 8.3 -9 685.30 -37.8 -38.0 -37.9 73 -99 SPO 1997 04 07 01 26 318 8.4 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 27 318 8.2 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 28 318 8.3 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 29 317 9.1 -9 685.30 -37.8 -38.1 -38.0 73 -99 SPO 1997 04 07 01 30 317 8.7 -9 685.30 -37.9 -38.1 -38.0 73 -99 SPO 1997 04 07 01 31 316 9.1 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 32 315 8.3 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 33 318 8.5 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 34 318 8.7 -9 685.20 -37.9 -38.2 -38.0 72 -99 SPO 1997 04 07 01 35 317 8.7 -9 685.20 -38.0 -38.3 -38.1 73 -99 SPO 1997 04 07 01 36 316 8.5 -9 685.20 -38.0 -38.4 -38.1 -99 -99 SPO 1997 04 07 01 37 316 8.6 -9 685.20 -38.1 -38.4 -38.1 -99 -99 SPO 1997 04 07 01 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 01 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 01 40 317 8.1 -9 685.20 -38.1 -38.4 -38.2 -99 -99 SPO 1997 04 07 01 41 316 8.4 -9 685.20 -38.1 -38.5 -38.2 -99 -99 SPO 1997 04 07 01 42 315 8.5 -9 685.20 -38.1 -38.5 -38.2 73 -99 SPO 1997 04 07 01 43 315 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 44 315 7.3 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 45 315 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 46 316 8.0 -9 685.20 -38.1 -38.5 -38.2 71 -99 SPO 1997 04 07 01 47 318 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 48 321 7.4 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 49 317 7.8 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 50 320 7.7 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 51 317 7.7 -9 685.20 -38.2 -38.6 -38.3 73 -99 SPO 1997 04 07 01 52 319 8.1 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 53 318 7.4 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 54 317 7.2 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 55 318 7.5 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 56 320 8.2 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 57 320 8.3 -9 685.20 -38.3 -38.6 -38.5 73 -99 SPO 1997 04 07 01 58 321 7.7 -9 685.20 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 01 59 322 7.5 -9 685.20 -38.4 -38.7 -38.4 72 -99 SPO 1997 04 07 02 00 320 8.4 -9 685.20 -38.4 -38.7 -38.5 71 0 SPO 1997 04 07 02 01 318 8.8 -9 685.20 -38.5 -38.8 -38.6 73 -99 SPO 1997 04 07 02 02 318 7.7 -9 685.20 -38.5 -38.9 -38.6 72 -99 SPO 1997 04 07 02 03 319 7.8 -9 685.20 -38.5 -39.0 -38.6 72 -99 SPO 1997 04 07 02 04 318 7.8 -9 685.20 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 02 05 318 8.1 -9 685.20 -38.6 -39.0 -38.6 73 -99 SPO 1997 04 07 02 06 320 8.2 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 07 320 8.0 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 08 319 8.5 -9 685.10 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 09 320 7.6 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 10 318 8.4 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 11 318 8.3 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 12 318 8.4 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 13 318 8.6 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 14 316 8.1 -9 685.10 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 15 317 8.3 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 16 315 8.5 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 17 320 8.1 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 02 18 321 8.3 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 02 19 320 8.4 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 20 317 8.5 -9 685.10 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 21 318 9.1 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 22 317 9.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 23 317 9.1 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 24 317 8.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 25 316 8.8 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 26 315 8.5 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 27 315 8.6 -9 685.00 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 28 315 8.7 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 29 316 8.4 -9 685.10 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 30 317 8.5 -9 685.10 -38.6 -39.0 -38.8 72 -99 SPO 1997 04 07 02 31 317 8.7 -9 685.10 -38.6 -39.0 -38.8 73 -99 SPO 1997 04 07 02 32 315 8.7 -9 685.10 -38.6 -39.0 -38.8 73 -99 SPO 1997 04 07 02 33 315 8.5 -9 685.10 -38.6 -39.0 -38.8 72 -99 SPO 1997 04 07 02 34 316 8.7 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 35 316 8.2 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 36 317 8.7 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 37 316 8.8 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 38 317 8.5 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 39 316 8.7 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 40 315 8.2 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 41 317 8.0 -9 685.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 02 42 318 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 43 319 8.4 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 44 319 7.7 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 45 320 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 46 319 8.4 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 47 318 8.5 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 48 320 8.4 -9 685.10 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 49 320 8.7 -9 685.10 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 50 320 8.6 -9 685.10 -38.7 -39.1 -38.9 72 -99 SPO 1997 04 07 02 51 320 8.5 -9 685.10 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 02 52 319 8.5 -9 685.10 -38.8 -39.2 -38.9 73 -99 SPO 1997 04 07 02 53 320 8.5 -9 685.10 -38.7 -39.2 -38.9 72 -99 SPO 1997 04 07 02 54 319 8.9 -9 685.10 -38.8 -39.2 -38.9 73 -99 SPO 1997 04 07 02 55 318 8.8 -9 685.10 -38.8 -39.2 -38.9 72 -99 SPO 1997 04 07 02 56 317 8.9 -9 685.10 -38.8 -39.2 -38.9 71 -99 SPO 1997 04 07 02 57 318 8.7 -9 685.00 -38.8 -39.2 -38.9 71 -99 SPO 1997 04 07 02 58 319 9.2 -9 685.00 -38.8 -39.1 -38.9 71 -99 SPO 1997 04 07 02 59 319 9.3 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 00 319 8.3 -9 685.00 -38.8 -39.1 -38.9 72 0 SPO 1997 04 07 03 01 318 8.2 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 02 318 8.7 -9 685.00 -38.8 -39.1 -38.8 72 -99 SPO 1997 04 07 03 03 317 8.3 -9 685.10 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 04 316 7.9 -9 685.10 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 03 05 315 7.8 -9 685.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 03 06 313 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 03 07 313 7.5 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 03 08 315 8.1 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 03 09 316 8.0 -9 685.10 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 03 10 317 8.0 -9 685.10 -38.7 -38.9 -38.7 73 -99 SPO 1997 04 07 03 11 317 8.4 -9 685.10 -38.7 -38.9 -38.7 72 -99 SPO 1997 04 07 03 12 317 8.5 -9 685.10 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 03 13 316 8.6 -9 685.00 -38.6 -38.9 -38.7 71 -99 SPO 1997 04 07 03 14 317 8.3 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 03 15 317 8.6 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 03 16 316 8.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 03 17 317 8.1 -9 685.00 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 03 18 316 8.5 -9 685.00 -38.5 -39.0 -38.7 72 -99 SPO 1997 04 07 03 19 316 7.8 -9 685.10 -38.5 -38.9 -38.6 72 -99 SPO 1997 04 07 03 20 315 8.2 -9 685.00 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 03 21 315 7.9 -9 685.10 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 03 22 315 8.2 -9 685.10 -38.5 -38.8 -38.6 73 -99 SPO 1997 04 07 03 23 315 7.7 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 24 315 8.0 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 25 315 7.6 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 26 316 7.8 -9 685.10 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 03 27 316 7.7 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 28 315 7.9 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 29 317 8.0 -9 685.20 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 30 318 7.7 -9 685.20 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 03 31 318 8.0 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 32 317 8.1 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 33 317 8.0 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 34 317 7.8 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 35 317 7.9 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 36 316 8.1 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 37 316 8.0 -9 685.30 -38.6 -38.7 -38.6 72 -99 SPO 1997 04 07 03 38 316 7.8 -9 685.30 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 39 316 7.7 -9 685.30 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 03 40 317 8.1 -9 685.30 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 41 317 8.0 -9 685.30 -38.6 -38.8 -38.6 72 -99 SPO 1997 04 07 03 42 317 7.9 -9 685.30 -38.5 -38.8 -38.6 71 -99 SPO 1997 04 07 03 43 315 8.1 -9 685.30 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 03 44 315 7.9 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 03 45 314 8.5 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 03 46 314 8.4 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 47 313 8.2 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 48 312 8.0 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 49 313 7.4 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 50 313 7.3 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 51 312 7.8 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 52 313 7.8 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 53 314 7.7 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 54 313 7.4 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 55 313 7.2 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 56 312 7.5 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 57 311 7.3 -9 685.40 -38.4 -38.6 -38.5 72 -99 SPO 1997 04 07 03 58 313 7.5 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 03 59 313 7.4 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 00 312 7.9 -9 685.40 -38.4 -38.6 -38.5 72 0 SPO 1997 04 07 04 01 314 7.3 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 02 314 7.0 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 03 314 7.5 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 04 313 7.8 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 05 312 7.6 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 06 311 7.2 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 07 312 7.3 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 08 314 7.4 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 09 314 7.6 -9 685.40 -38.4 -38.7 -38.5 72 -99 SPO 1997 04 07 04 10 316 7.9 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 04 11 315 7.9 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 12 316 7.7 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 13 317 8.1 -9 685.20 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 04 14 318 8.7 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 15 318 8.5 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 16 318 8.5 -9 685.10 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 17 319 8.1 -9 685.10 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 18 320 8.3 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 19 320 8.0 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 20 321 7.8 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 21 322 8.1 -9 685.20 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 04 22 322 7.5 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 04 23 323 7.8 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 04 24 323 8.0 -9 685.20 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 04 25 325 7.2 -9 685.20 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 04 26 325 7.1 -9 685.30 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 04 27 325 7.0 -9 685.30 -38.6 -38.9 -38.8 73 -99 SPO 1997 04 07 04 28 322 7.6 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 29 324 7.2 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 30 323 7.7 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 31 322 7.6 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 32 323 7.2 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 33 324 7.1 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 34 323 7.7 -9 685.30 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 04 35 322 7.6 -9 685.30 -38.8 -39.0 -38.9 74 -99 SPO 1997 04 07 04 36 322 7.7 -9 685.30 -38.8 -39.0 -38.9 74 -99 SPO 1997 04 07 04 37 322 7.4 -9 685.30 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 38 323 7.2 -9 685.30 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 39 323 7.2 -9 685.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 04 40 325 7.3 -9 685.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 41 325 8.1 -9 685.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 42 328 7.6 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 43 326 7.9 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 44 327 7.6 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 45 327 7.7 -9 685.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 46 327 7.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 47 326 7.9 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 48 326 7.8 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 49 326 7.9 -9 685.00 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 04 50 325 8.2 -9 685.00 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 04 51 326 7.9 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 52 325 7.9 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 53 325 7.6 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 54 325 8.3 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 55 324 7.9 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 56 324 7.5 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 57 324 7.4 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 58 324 7.4 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 59 323 7.3 -9 685.00 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 05 00 325 7.2 -9 685.00 -38.9 -39.0 -38.9 73 0 SPO 1997 04 07 05 01 326 6.8 -9 685.00 -38.9 -39.1 -38.9 74 -99 SPO 1997 04 07 05 02 324 6.8 -9 685.00 -38.9 -39.1 -38.9 74 -99 SPO 1997 04 07 05 03 324 7.1 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 04 324 6.9 -9 685.00 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 05 05 325 6.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 06 324 6.4 -9 685.00 -38.9 -39.0 -38.9 72 -99 SPO 1997 04 07 05 07 324 6.5 -9 685.00 -38.9 -39.0 -38.9 72 -99 SPO 1997 04 07 05 08 323 6.9 -9 685.00 -38.9 -39.0 -38.9 71 -99 SPO 1997 04 07 05 09 322 7.1 -9 685.00 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 05 10 322 7.2 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 11 323 7.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 12 322 7.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 13 322 7.0 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 14 323 6.7 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 15 323 6.9 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 16 324 7.4 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 17 325 7.4 -9 684.90 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 05 18 326 7.3 -9 684.90 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 05 19 325 7.0 -9 684.90 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 05 20 324 6.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 21 322 6.5 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 22 323 6.4 -9 685.00 -38.8 -39.0 -38.8 71 -99 SPO 1997 04 07 05 23 324 6.3 -9 685.00 -38.8 -39.0 -38.8 71 -99 SPO 1997 04 07 05 24 322 6.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 25 320 6.2 -9 685.00 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 05 26 318 5.8 -9 685.00 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 05 27 316 6.0 -9 685.00 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 05 28 316 6.3 -9 685.00 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 05 29 316 6.0 -9 685.00 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 05 30 319 6.2 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 31 316 5.9 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 32 319 6.0 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 33 319 6.4 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 34 321 6.2 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 35 318 6.4 -9 685.00 -38.6 -38.7 -38.7 72 -99 SPO 1997 04 07 05 36 318 6.4 -9 684.90 -38.6 -38.7 -38.7 71 -99 SPO 1997 04 07 05 37 318 6.5 -9 684.90 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 05 38 318 6.9 -9 684.90 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 05 39 317 7.1 -9 684.90 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 05 40 317 7.7 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 41 316 7.8 -9 684.90 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 05 42 315 7.6 -9 684.90 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 43 315 7.3 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 44 314 7.5 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 45 315 6.8 -9 684.80 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 46 316 7.1 -9 684.80 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 05 47 315 7.8 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 48 313 7.8 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 49 314 7.6 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 50 314 7.8 -9 684.80 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 05 51 313 8.0 -9 684.80 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 05 52 312 7.5 -9 684.70 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 53 313 7.5 -9 684.70 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 54 314 7.7 -9 684.70 -38.5 -38.6 -38.6 73 -99 SPO 1997 04 07 05 55 316 8.2 -9 684.70 -38.5 -38.6 -38.5 73 -99 SPO 1997 04 07 05 56 315 8.1 -9 684.70 -38.5 -38.6 -38.5 73 -99 SPO 1997 04 07 05 57 316 8.0 -9 684.70 -38.4 -38.6 -38.5 72 -99 SPO 1997 04 07 05 58 317 8.0 -9 684.70 -38.4 -38.5 -38.4 72 -99 SPO 1997 04 07 05 59 318 7.9 -9 684.70 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 00 318 8.1 -9 684.70 -38.4 -38.5 -38.4 73 0 SPO 1997 04 07 06 01 318 7.8 -9 684.70 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 02 317 7.5 -9 684.70 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 03 318 7.4 -9 684.70 -38.3 -38.5 -38.3 73 -99 SPO 1997 04 07 06 04 320 7.4 -9 684.70 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 05 319 7.8 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 06 321 7.7 -9 684.60 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 07 320 7.6 -9 684.60 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 08 318 7.6 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 09 318 7.6 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 10 318 8.0 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 11 319 8.1 -9 684.60 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 07 06 12 320 7.8 -9 684.50 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 13 321 7.2 -9 684.50 -38.4 -38.4 -38.4 73 -99 SPO 1997 04 07 06 14 321 7.4 -9 684.50 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 15 322 7.6 -9 684.40 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 16 322 7.4 -9 684.50 -38.3 -38.3 -38.4 73 -99 SPO 1997 04 07 06 17 324 7.5 -9 684.50 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 18 326 7.0 -9 684.40 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 19 325 7.0 -9 684.40 -38.3 -38.4 -38.4 72 -99 SPO 1997 04 07 06 20 327 6.7 -9 684.40 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 07 06 21 327 6.6 -9 684.40 -38.5 -38.6 -38.6 73 -99 SPO 1997 04 07 06 22 328 6.7 -9 684.40 -38.5 -38.6 -38.7 73 -99 SPO 1997 04 07 06 23 329 6.6 -9 684.40 -38.6 -38.6 -38.7 73 -99 SPO 1997 04 07 06 24 328 7.0 -9 684.40 -38.6 -38.6 -38.7 73 -99 SPO 1997 04 07 06 25 328 6.9 -9 684.40 -38.6 -38.6 -38.7 72 -99 SPO 1997 04 07 06 26 330 6.9 -9 684.40 -38.6 -38.7 -38.7 72 -99 SPO 1997 04 07 06 27 327 6.9 -9 684.40 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 06 28 327 6.6 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 29 325 7.2 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 30 323 7.0 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 31 323 6.8 -9 684.50 -38.8 -38.8 -38.9 74 -99 SPO 1997 04 07 06 32 325 6.8 -9 684.50 -38.8 -38.8 -38.9 74 -99 SPO 1997 04 07 06 33 324 7.0 -9 684.50 -38.8 -38.8 -38.9 72 -99 SPO 1997 04 07 06 34 325 6.9 -9 684.50 -38.8 -38.8 -38.9 71 -99 SPO 1997 04 07 06 35 326 6.7 -9 684.40 -38.9 -38.8 -38.9 71 -99 SPO 1997 04 07 06 36 324 6.4 -9 684.40 -38.9 -38.8 -39.0 71 -99 SPO 1997 04 07 06 37 326 6.6 -9 684.40 -38.9 -38.8 -39.0 71 -99 SPO 1997 04 07 06 38 327 7.0 -9 684.40 -38.9 -38.8 -39.0 72 -99 SPO 1997 04 07 06 39 328 6.8 -9 684.30 -38.9 -38.8 -39.0 72 -99 SPO 1997 04 07 06 40 326 6.9 -9 684.40 -39.0 -38.7 -39.0 72 -99 SPO 1997 04 07 06 41 326 7.0 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 42 325 7.1 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 43 324 7.2 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 44 324 7.3 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 45 324 7.2 -9 684.30 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 46 322 7.2 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 47 323 7.0 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 48 322 6.9 -9 684.40 -39.0 -38.8 -39.1 70 -99 SPO 1997 04 07 06 49 320 6.9 -9 684.50 -39.1 -38.8 -39.1 70 -99 SPO 1997 04 07 06 50 319 7.0 -9 684.50 -39.1 -38.9 -39.1 71 -99 SPO 1997 04 07 06 51 317 7.1 -9 684.50 -39.1 -38.9 -39.1 72 -99 SPO 1997 04 07 06 52 317 7.3 -9 684.50 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 06 53 316 7.4 -9 684.50 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 06 54 315 7.3 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 55 316 7.5 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 56 318 7.4 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 57 318 7.3 -9 684.40 -39.0 -38.7 -39.0 72 -99 SPO 1997 04 07 06 58 319 7.5 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 59 318 7.4 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 07 00 317 7.4 -9 684.40 -39.0 -38.8 -39.1 71 0 SPO 1997 04 07 07 01 317 7.5 -9 684.40 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 07 02 319 7.2 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 03 320 7.3 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 04 320 7.0 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 05 322 7.1 -9 684.40 -39.1 -38.9 -39.2 70 -99 SPO 1997 04 07 07 06 322 7.1 -9 684.40 -39.2 -38.9 -39.2 72 -99 SPO 1997 04 07 07 07 324 7.2 -9 684.30 -39.2 -38.9 -39.3 72 -99 SPO 1997 04 07 07 08 324 7.1 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 09 325 7.2 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 10 325 7.0 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 11 325 7.2 -9 684.30 -39.3 -38.8 -39.4 72 -99 SPO 1997 04 07 07 12 325 7.3 -9 684.30 -39.3 -38.9 -39.4 71 -99 SPO 1997 04 07 07 13 325 7.5 -9 684.30 -39.3 -39.0 -39.4 72 -99 SPO 1997 04 07 07 14 326 7.5 -9 684.30 -39.4 -39.0 -39.4 72 -99 SPO 1997 04 07 07 15 325 7.7 -9 684.20 -39.4 -39.0 -39.5 72 -99 SPO 1997 04 07 07 16 325 7.9 -9 684.20 -39.4 -39.0 -39.5 72 -99 SPO 1997 04 07 07 17 324 8.0 -9 684.20 -39.4 -39.0 -39.5 71 -99 SPO 1997 04 07 07 18 323 8.2 -9 684.20 -39.5 -39.0 -39.5 71 -99 SPO 1997 04 07 07 19 321 8.5 -9 684.20 -39.5 -39.0 -39.6 71 -99 SPO 1997 04 07 07 20 320 8.1 -9 684.20 -39.5 -39.0 -39.6 71 -99 SPO 1997 04 07 07 21 321 7.7 -9 684.30 -39.6 -39.0 -39.7 72 -99 SPO 1997 04 07 07 22 321 8.2 -9 684.20 -39.6 -38.9 -39.6 72 -99 SPO 1997 04 07 07 23 321 8.3 -9 684.20 -39.6 -38.9 -39.6 72 -99 SPO 1997 04 07 07 24 320 7.9 -9 684.20 -39.6 -38.8 -39.7 72 -99 SPO 1997 04 07 07 25 318 7.5 -9 684.30 -39.7 -38.9 -39.7 72 -99 SPO 1997 04 07 07 26 318 7.2 -9 684.30 -39.7 -38.9 -39.8 72 -99 SPO 1997 04 07 07 27 318 7.1 -9 684.30 -39.8 -38.9 -40.0 72 -99 SPO 1997 04 07 07 28 317 7.0 -9 684.30 -39.9 -38.9 -40.0 71 -99 SPO 1997 04 07 07 29 317 6.8 -9 684.30 -39.9 -38.9 -40.0 71 -99 SPO 1997 04 07 07 30 320 7.0 -9 684.30 -40.0 -38.9 -40.0 71 -99 SPO 1997 04 07 07 31 320 6.8 -9 684.30 -40.0 -39.0 -40.1 71 -99 SPO 1997 04 07 07 32 322 7.1 -9 684.20 -40.1 -39.0 -40.2 71 -99 SPO 1997 04 07 07 33 323 7.0 -9 684.20 -40.1 -39.1 -40.2 70 -99 SPO 1997 04 07 07 34 323 6.9 -9 684.20 -40.1 -39.1 -40.2 70 -99 SPO 1997 04 07 07 35 324 7.1 -9 684.20 -40.2 -39.2 -40.3 71 -99 SPO 1997 04 07 07 36 326 7.0 -9 684.20 -40.3 -39.2 -40.3 71 -99 SPO 1997 04 07 07 37 324 7.0 -9 684.20 -40.4 -39.4 -40.4 71 -99 SPO 1997 04 07 07 38 323 7.0 -9 684.20 -40.4 -39.4 -40.5 71 -99 SPO 1997 04 07 07 39 324 7.0 -9 684.20 -40.5 -39.5 -40.5 71 -99 SPO 1997 04 07 07 40 324 7.1 -9 684.20 -40.5 -39.5 -40.5 70 -99 SPO 1997 04 07 07 41 323 7.1 -9 684.20 -40.5 -39.5 -40.5 70 -99 SPO 1997 04 07 07 42 322 7.0 -9 684.20 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 43 323 7.1 -9 684.20 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 44 324 7.3 -9 684.10 -40.5 -39.6 -40.6 70 -99 SPO 1997 04 07 07 45 322 7.2 -9 684.10 -40.5 -39.6 -40.6 69 -99 SPO 1997 04 07 07 46 321 7.1 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 47 320 7.1 -9 684.10 -40.5 -39.5 -40.5 69 -99 SPO 1997 04 07 07 48 318 7.0 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 49 316 7.0 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 50 315 7.2 -9 684.10 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 51 314 7.3 -9 684.10 -40.4 -39.6 -40.4 69 -99 SPO 1997 04 07 07 52 314 7.2 -9 684.10 -40.3 -39.6 -40.3 71 -99 SPO 1997 04 07 07 53 315 7.1 -9 684.00 -40.2 -39.6 -40.2 70 -99 SPO 1997 04 07 07 54 314 7.4 -9 684.00 -40.2 -39.6 -40.2 71 -99 SPO 1997 04 07 07 55 313 7.1 -9 684.00 -40.2 -39.6 -40.2 71 -99 SPO 1997 04 07 07 56 312 7.2 -9 684.00 -40.1 -39.6 -40.1 71 -99 SPO 1997 04 07 07 57 314 7.2 -9 684.00 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 07 58 311 6.9 -9 684.00 -40.0 -39.6 -40.1 70 -99 SPO 1997 04 07 07 59 311 6.9 -9 684.00 -40.0 -39.6 -40.1 69 -99 SPO 1997 04 07 08 00 312 6.5 -9 684.00 -40.0 -39.7 -40.2 70 0 SPO 1997 04 07 08 01 314 6.5 -9 683.90 -40.1 -39.8 -40.2 70 -99 SPO 1997 04 07 08 02 315 6.5 -9 683.90 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 03 316 6.7 -9 683.90 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 04 317 6.8 -9 683.80 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 05 317 6.9 -9 683.80 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 06 317 7.0 -9 683.80 -40.2 -39.8 -40.3 71 -99 SPO 1997 04 07 08 07 317 7.9 -9 683.70 -40.2 -39.8 -40.3 71 -99 SPO 1997 04 07 08 08 316 8.5 -9 683.70 -40.2 -39.7 -40.0 71 -99 SPO 1997 04 07 08 09 314 8.2 -9 683.70 -40.0 -39.6 -40.0 71 -99 SPO 1997 04 07 08 10 315 7.8 -9 683.70 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 11 314 7.4 -9 683.80 -40.1 -39.7 -40.2 72 -99 SPO 1997 04 07 08 12 313 7.7 -9 683.70 -40.1 -39.7 -40.1 71 -99 SPO 1997 04 07 08 13 315 7.7 -9 683.70 -40.0 -39.7 -40.1 71 -99 SPO 1997 04 07 08 14 318 7.9 -9 683.60 -40.0 -39.7 -40.1 71 -99 SPO 1997 04 07 08 15 319 8.0 -9 683.60 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 16 322 8.4 -9 683.50 -40.0 -39.6 -40.0 71 -99 SPO 1997 04 07 08 17 322 8.4 -9 683.40 -40.0 -39.5 -40.0 71 -99 SPO 1997 04 07 08 18 324 8.1 -9 683.40 -40.0 -39.5 -40.1 71 -99 SPO 1997 04 07 08 19 323 8.2 -9 683.40 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 20 322 8.3 -9 683.40 -40.0 -39.6 -40.0 72 -99 SPO 1997 04 07 08 21 321 7.9 -9 683.40 -39.9 -39.6 -40.0 71 -99 SPO 1997 04 07 08 22 321 8.2 -9 683.50 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 08 23 321 8.2 -9 683.50 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 08 24 319 7.9 -9 683.40 -39.9 -39.6 -39.9 72 -99 SPO 1997 04 07 08 25 317 7.8 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 26 315 7.3 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 27 315 7.3 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 28 317 7.3 -9 683.50 -39.7 -39.6 -39.8 71 -99 SPO 1997 04 07 08 29 317 7.4 -9 683.50 -39.7 -39.6 -39.8 72 -99 SPO 1997 04 07 08 30 318 7.4 -9 683.50 -39.7 -39.5 -39.8 71 -99 SPO 1997 04 07 08 31 321 8.1 -9 683.50 -39.7 -39.6 -39.8 71 -99 SPO 1997 04 07 08 32 322 8.5 -9 683.40 -39.7 -39.5 -39.8 72 -99 SPO 1997 04 07 08 33 322 8.0 -9 683.40 -39.7 -39.5 -39.8 72 -99 SPO 1997 04 07 08 34 321 8.0 -9 683.40 -39.8 -39.5 -39.8 73 -99 SPO 1997 04 07 08 35 322 8.3 -9 683.40 -39.8 -39.5 -39.8 73 -99 SPO 1997 04 07 08 36 321 8.3 -9 683.30 -39.7 -39.4 -39.8 72 -99 SPO 1997 04 07 08 37 320 8.4 -9 683.30 -39.7 -39.4 -39.7 72 -99 SPO 1997 04 07 08 38 319 9.8 -9 683.20 -39.7 -39.2 -39.6 72 -99 SPO 1997 04 07 08 39 323 8.8 -9 683.20 -39.6 -39.1 -39.5 72 -99 SPO 1997 04 07 08 40 323 8.3 -9 683.20 -39.5 -39.0 -39.6 72 -99 SPO 1997 04 07 08 41 320 8.2 -9 683.20 -39.6 -39.2 -39.6 72 -99 SPO 1997 04 07 08 42 322 8.5 -9 683.20 -39.6 -39.2 -39.6 72 -99 SPO 1997 04 07 08 43 323 8.1 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 44 323 8.1 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 45 324 8.0 -9 683.20 -39.6 -39.3 -39.7 71 -99 SPO 1997 04 07 08 46 324 7.8 -9 683.20 -39.6 -39.3 -39.7 71 -99 SPO 1997 04 07 08 47 323 8.0 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 48 323 7.6 -9 683.20 -39.6 -39.4 -39.7 72 -99 SPO 1997 04 07 08 49 322 7.6 -9 683.20 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 08 50 324 7.2 -9 683.20 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 08 51 324 7.2 -9 683.20 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 08 52 322 6.7 -9 683.20 -39.5 -39.4 -39.5 72 -99 SPO 1997 04 07 08 53 322 6.4 -9 683.30 -39.5 -39.4 -39.5 72 -99 SPO 1997 04 07 08 54 323 6.8 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 08 55 323 6.2 -9 683.30 -39.4 -39.3 -39.5 71 -99 SPO 1997 04 07 08 56 323 6.2 -9 683.30 -39.4 -39.3 -39.5 71 -99 SPO 1997 04 07 08 57 322 6.4 -9 683.30 -39.4 -39.3 -39.4 71 -99 SPO 1997 04 07 08 58 322 6.3 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 08 59 322 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 00 323 6.2 -9 683.30 -39.4 -39.4 -39.5 72 0 SPO 1997 04 07 09 01 323 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 02 321 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 03 323 5.9 -9 683.40 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 04 321 6.0 -9 683.40 -39.4 -39.4 -39.5 71 -99 SPO 1997 04 07 09 05 322 6.0 -9 683.40 -39.4 -39.4 -39.5 71 -99 SPO 1997 04 07 09 06 322 6.0 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 07 323 5.9 -9 683.40 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 08 325 5.6 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 09 322 5.5 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 10 323 5.8 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 11 324 5.8 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 12 324 5.9 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 13 325 5.4 -9 683.40 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 14 325 5.3 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 15 324 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 16 324 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 17 321 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 18 326 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 19 326 5.1 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 20 324 5.0 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 21 326 5.1 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 22 325 4.8 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 23 324 5.1 -9 683.50 -39.3 -39.3 -39.4 72 -99 SPO 1997 04 07 09 24 325 4.9 -9 683.50 -39.3 -39.3 -39.4 72 -99 SPO 1997 04 07 09 25 323 4.8 -9 683.50 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 09 26 323 5.1 -9 683.50 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 09 27 323 5.1 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 28 323 5.3 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 29 324 5.3 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 30 323 5.4 -9 683.50 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 09 31 322 5.5 -9 683.50 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 09 32 324 5.2 -9 683.50 -39.1 -39.1 -39.2 71 -99 SPO 1997 04 07 09 33 325 5.2 -9 683.40 -39.1 -39.1 -39.2 71 -99 SPO 1997 04 07 09 34 323 5.7 -9 683.40 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 09 35 324 5.8 -9 683.40 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 09 36 323 5.8 -9 683.40 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 09 37 324 5.6 -9 683.40 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 09 38 324 6.4 -9 683.40 -39.0 -39.1 -39.1 72 -99 SPO 1997 04 07 09 39 323 6.1 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 40 324 6.5 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 41 323 6.4 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 42 324 6.4 -9 683.30 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 09 43 325 6.8 -9 683.30 -38.9 -39.0 -39.0 71 -99 SPO 1997 04 07 09 44 325 6.6 -9 683.30 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 09 45 325 6.7 -9 683.30 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 09 46 325 6.5 -9 683.30 -38.9 -38.9 -38.9 73 -99 SPO 1997 04 07 09 47 324 6.6 -9 683.30 -38.9 -38.9 -38.9 73 -99 SPO 1997 04 07 09 48 323 6.9 -9 683.30 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 09 49 324 7.0 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 09 50 324 6.7 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 09 51 324 7.0 -9 683.30 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 09 52 325 6.7 -9 683.30 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 09 53 326 6.4 -9 683.30 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 09 54 326 6.7 -9 683.30 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 09 55 325 6.4 -9 683.30 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 09 56 325 6.5 -9 683.30 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 09 57 326 6.6 -9 683.30 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 09 58 326 6.7 -9 683.30 -38.8 -38.9 -38.9 73 -99 SPO 1997 04 07 09 59 325 6.8 -9 683.30 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 00 327 6.7 -9 683.30 -38.8 -38.9 -38.8 73 0 SPO 1997 04 07 10 01 330 6.7 -9 683.30 -38.8 -39.0 -38.8 73 -99 SPO 1997 04 07 10 02 326 6.2 -9 683.30 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 10 03 326 6.7 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 04 326 6.6 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 05 323 6.4 -9 683.30 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 06 322 6.2 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 07 319 6.3 -9 683.40 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 10 08 318 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 09 318 6.4 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 10 317 6.7 -9 683.40 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 11 317 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 12 317 6.5 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 13 318 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 14 318 6.4 -9 683.30 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 15 321 7.1 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 16 321 6.8 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 17 320 6.8 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 18 320 6.9 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 19 318 7.0 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 20 320 6.9 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 21 320 6.9 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 22 320 7.0 -9 683.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 23 322 7.0 -9 683.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 24 319 7.4 -9 683.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 10 25 320 7.1 -9 683.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 10 26 321 6.9 -9 683.20 -38.7 -39.0 -38.8 70 -99 SPO 1997 04 07 10 27 322 7.1 -9 683.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 10 28 322 7.3 -9 683.20 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 10 29 323 6.9 -9 683.20 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 10 30 323 6.7 -9 683.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 31 322 7.2 -9 683.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 32 322 6.8 -9 683.20 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 33 323 6.6 -9 683.20 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 34 324 6.7 -9 683.20 -38.8 -38.9 -38.9 73 -99 SPO 1997 04 07 10 35 322 7.1 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 36 322 7.2 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 37 321 7.4 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 38 321 7.4 -9 683.20 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 39 321 7.0 -9 683.20 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 40 322 7.3 -9 683.20 -38.7 -38.9 -38.8 70 -99 SPO 1997 04 07 10 41 322 7.3 -9 683.20 -38.7 -38.9 -38.8 70 -99 SPO 1997 04 07 10 42 321 7.4 -9 683.20 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 10 43 319 7.7 -9 683.20 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 10 44 318 7.6 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 45 318 7.8 -9 683.10 -38.8 -38.9 -38.8 71 -99 SPO 1997 04 07 10 46 317 7.7 -9 683.10 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 47 317 7.9 -9 683.10 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 10 48 317 7.6 -9 683.10 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 10 49 318 7.4 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 50 319 7.7 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 51 319 7.6 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 52 321 7.5 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 53 322 7.3 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 10 54 323 7.2 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 10 55 324 7.3 -9 683.10 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 10 56 325 7.3 -9 683.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 10 57 327 7.1 -9 683.10 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 10 58 328 7.1 -9 683.20 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 10 59 330 7.3 -9 683.10 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 11 00 330 7.2 -9 683.10 -38.9 -39.1 -39.0 72 0 SPO 1997 04 07 11 01 330 6.8 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 02 331 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 03 331 7.2 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 04 330 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 05 330 6.8 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 06 330 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 07 330 7.0 -9 683.10 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 11 08 329 7.1 -9 683.10 -38.9 -39.1 -39.0 70 -99 SPO 1997 04 07 11 09 331 6.9 -9 683.10 -38.9 -39.1 -39.0 70 -99 SPO 1997 04 07 11 10 330 6.6 -9 683.10 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 11 11 330 6.6 -9 683.10 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 11 12 328 6.1 -9 683.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 11 13 327 6.1 -9 683.20 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 14 326 6.3 -9 683.20 -38.9 -39.1 -38.9 71 -99 SPO 1997 04 07 11 15 325 6.2 -9 683.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 11 16 330 6.0 -9 683.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 11 17 324 6.3 -9 683.20 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 11 18 321 6.0 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 19 326 5.8 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 20 331 6.1 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 21 329 6.2 -9 683.10 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 11 22 325 6.6 -9 683.10 -38.9 -39.2 -39.1 72 -99 SPO 1997 04 07 11 23 329 6.5 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 24 328 6.9 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 25 325 7.1 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 26 327 6.6 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 27 327 6.8 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 28 328 7.3 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 29 326 7.5 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 30 324 7.6 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 31 324 7.9 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 32 327 7.8 -9 682.90 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 11 33 326 8.0 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 34 324 8.0 -9 682.90 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 35 326 8.2 -9 682.90 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 36 327 8.3 -9 682.90 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 37 325 8.8 -9 682.80 -39.1 -39.2 -39.2 71 -99 SPO 1997 04 07 11 38 325 8.1 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 39 325 8.3 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 40 327 8.5 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 41 328 8.5 -9 682.80 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 42 327 8.3 -9 682.80 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 43 331 8.5 -9 682.70 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 44 329 8.6 -9 682.70 -39.2 -39.3 -39.3 73 -99 SPO 1997 04 07 11 45 329 8.8 -9 682.70 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 11 46 321 8.7 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 11 47 323 8.9 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 48 323 8.2 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 11 49 325 8.5 -9 682.70 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 50 328 8.8 -9 682.70 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 11 51 329 8.6 -9 682.70 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 11 52 327 9.0 -9 682.70 -39.2 -39.2 -39.2 71 -99 SPO 1997 04 07 11 53 322 8.2 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 11 54 330 8.5 -9 682.60 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 11 55 327 8.5 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 56 324 8.0 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 57 325 9.2 -9 682.60 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 58 330 8.8 -9 682.60 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 59 334 9.1 -9 682.50 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 00 330 8.4 -9 682.60 -39.1 -39.4 -39.2 72 0 SPO 1997 04 07 12 01 329 8.1 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 02 324 7.9 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 03 325 8.1 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 04 331 8.1 -9 682.60 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 05 331 8.4 -9 682.60 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 06 330 8.4 -9 682.60 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 12 07 330 8.6 -9 682.60 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 12 08 325 8.2 -9 682.60 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 12 09 322 8.2 -9 682.70 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 10 326 8.1 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 11 324 7.7 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 12 12 329 8.3 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 12 13 327 8.5 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 14 322 8.1 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 15 321 8.5 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 12 16 323 8.1 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 12 17 325 8.4 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 18 325 8.2 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 19 326 8.0 -9 682.70 -39.2 -39.3 -39.3 71 -99 SPO 1997 04 07 12 20 329 7.6 -9 682.70 -39.2 -39.3 -39.3 70 -99 SPO 1997 04 07 12 21 328 8.2 -9 682.70 -39.2 -39.3 -39.3 71 -99 SPO 1997 04 07 12 22 329 8.4 -9 682.70 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 12 23 328 8.2 -9 682.70 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 12 24 329 8.1 -9 682.70 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 12 25 330 8.0 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 26 329 8.3 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 27 331 7.9 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 28 329 8.1 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 29 330 7.7 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 30 333 8.0 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 31 335 8.2 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 32 335 8.1 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 33 334 7.6 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 34 327 7.2 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 35 329 7.4 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 36 327 7.7 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 37 327 7.7 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 38 330 7.3 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 39 331 7.2 -9 682.80 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 40 332 7.7 -9 682.80 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 41 333 7.8 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 42 333 7.6 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 43 331 7.6 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 44 329 8.2 -9 682.70 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 12 45 328 8.4 -9 682.70 -39.4 -39.7 -39.6 72 -99 SPO 1997 04 07 12 46 327 8.0 -9 682.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 12 47 328 7.5 -9 682.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 12 48 328 8.2 -9 682.70 -39.5 -39.7 -39.6 71 -99 SPO 1997 04 07 12 49 328 8.2 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 50 327 8.4 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 51 327 8.2 -9 682.60 -39.5 -39.8 -39.6 72 -99 SPO 1997 04 07 12 52 327 8.4 -9 682.60 -39.5 -39.8 -39.6 72 -99 SPO 1997 04 07 12 53 327 8.5 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 54 325 8.6 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 55 325 8.2 -9 682.60 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 12 56 327 8.3 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 57 328 8.4 -9 682.60 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 12 58 329 8.5 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 59 329 8.4 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 00 329 8.5 -9 682.60 -39.6 -39.7 -39.6 72 0 SPO 1997 04 07 13 01 329 8.8 -9 682.60 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 02 330 8.4 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 03 331 8.8 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 04 332 8.8 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 05 332 8.3 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 06 330 8.3 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 07 330 8.3 -9 682.50 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 13 08 332 8.2 -9 682.50 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 13 09 335 8.5 -9 682.50 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 13 10 333 8.5 -9 682.50 -39.6 -39.9 -39.8 72 -99 SPO 1997 04 07 13 11 329 8.4 -9 682.50 -39.7 -39.9 -39.8 73 -99 SPO 1997 04 07 13 12 331 8.8 -9 682.50 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 13 13 327 8.9 -9 682.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 13 14 327 9.1 -9 682.40 -39.8 -40.0 -39.9 72 -99 SPO 1997 04 07 13 15 327 8.9 -9 682.40 -39.8 -40.0 -39.9 72 -99 SPO 1997 04 07 13 16 328 9.4 -9 682.30 -39.8 -40.0 -40.0 72 -99 SPO 1997 04 07 13 17 327 9.0 -9 682.30 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 18 329 9.1 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 19 327 8.9 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 20 325 8.6 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 21 325 8.7 -9 682.20 -40.0 -40.0 -40.0 71 -99 SPO 1997 04 07 13 22 326 8.8 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 23 326 8.8 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 24 326 9.0 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 25 328 8.4 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 26 330 8.2 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 27 329 8.4 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 28 330 8.0 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 29 329 7.8 -9 682.20 -40.2 -40.1 -40.2 71 -99 SPO 1997 04 07 13 30 329 7.7 -9 682.20 -40.2 -40.1 -40.3 71 -99 SPO 1997 04 07 13 31 328 8.6 -9 682.20 -40.2 -40.2 -40.3 71 -99 SPO 1997 04 07 13 32 326 8.6 -9 682.20 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 13 33 327 8.3 -9 682.20 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 13 34 328 8.0 -9 682.20 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 35 331 7.8 -9 682.20 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 13 36 331 8.0 -9 682.20 -40.3 -40.3 -40.3 71 -99 SPO 1997 04 07 13 37 331 7.7 -9 682.20 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 13 38 333 7.6 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 13 39 333 8.0 -9 682.10 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 40 331 8.1 -9 682.10 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 41 330 8.1 -9 682.10 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 13 42 328 8.5 -9 682.10 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 13 43 328 8.1 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 44 327 8.4 -9 682.10 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 45 328 8.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 46 329 8.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 47 328 8.4 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 48 329 8.2 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 49 330 8.6 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 50 330 8.4 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 51 330 8.1 -9 681.90 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 52 329 8.5 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 13 53 328 8.2 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 13 54 326 8.8 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 13 55 329 8.7 -9 681.90 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 13 56 327 8.4 -9 681.90 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 13 57 324 8.0 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 13 58 329 8.1 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 13 59 327 7.9 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 00 324 8.3 -9 681.90 -40.3 -40.6 -40.4 71 0 SPO 1997 04 07 14 01 326 8.5 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 02 328 9.1 -9 681.80 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 03 326 9.0 -9 681.80 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 14 04 325 8.9 -9 681.90 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 14 05 326 8.2 -9 681.90 -40.4 -40.5 -40.4 73 -99 SPO 1997 04 07 14 06 330 8.2 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 07 327 8.5 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 08 325 8.8 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 09 328 8.4 -9 681.90 -40.4 -40.5 -40.5 72 -99 SPO 1997 04 07 14 10 328 8.3 -9 681.90 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 14 11 327 8.5 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 14 12 327 8.3 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 14 13 328 8.6 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 14 327 8.9 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 15 326 8.8 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 16 327 8.9 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 17 327 9.1 -9 681.80 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 14 18 327 9.0 -9 681.80 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 19 326 8.3 -9 681.80 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 14 20 328 8.7 -9 681.80 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 21 330 9.1 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 22 328 8.5 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 23 327 8.9 -9 681.80 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 24 328 8.9 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 25 328 8.7 -9 681.80 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 14 26 328 9.0 -9 681.80 -40.4 -40.7 -40.6 71 -99 SPO 1997 04 07 14 27 326 9.0 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 28 325 9.2 -9 681.80 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 14 29 325 9.3 -9 681.80 -40.5 -40.6 -40.5 73 -99 SPO 1997 04 07 14 30 321 9.3 -9 681.80 -40.4 -40.5 -40.5 72 -99 SPO 1997 04 07 14 31 323 9.6 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 32 323 9.0 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 33 320 9.0 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 34 321 8.8 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 35 325 9.3 -9 681.80 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 14 36 322 9.0 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 14 37 323 8.8 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 14 38 326 8.9 -9 681.80 -40.5 -40.6 -40.6 70 -99 SPO 1997 04 07 14 39 323 8.9 -9 681.80 -40.5 -40.6 -40.6 69 -99 SPO 1997 04 07 14 40 323 8.8 -9 681.80 -40.5 -40.6 -40.6 68 -99 SPO 1997 04 07 14 41 324 8.4 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 42 323 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 43 322 8.7 -9 681.70 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 44 322 8.8 -9 681.70 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 14 45 321 8.9 -9 681.70 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 14 46 319 9.2 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 47 320 9.0 -9 681.70 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 48 321 9.0 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 49 319 8.8 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 50 318 9.0 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 51 318 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 52 319 9.0 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 53 320 8.5 -9 681.80 -40.5 -40.6 -40.5 69 -99 SPO 1997 04 07 14 54 319 8.5 -9 681.80 -40.5 -40.6 -40.6 69 -99 SPO 1997 04 07 14 55 323 8.2 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 56 323 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 57 323 8.5 -9 681.80 -40.5 -40.6 -40.6 70 -99 SPO 1997 04 07 14 58 322 8.3 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 14 59 322 8.5 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 15 00 323 8.7 -9 681.80 -40.5 -40.6 -40.6 72 0 SPO 1997 04 07 15 01 323 8.7 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 15 02 322 8.9 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 03 321 8.5 -9 681.70 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 15 04 320 8.3 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 05 320 8.7 -9 681.70 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 06 321 8.8 -9 681.70 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 07 320 8.7 -9 681.70 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 08 320 8.3 -9 681.70 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 09 319 8.4 -9 681.70 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 10 318 8.7 -9 681.70 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 11 319 8.5 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 12 319 8.4 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 13 319 8.6 -9 681.70 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 14 320 8.4 -9 681.70 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 15 321 8.2 -9 681.70 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 16 320 8.8 -9 681.70 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 17 322 8.6 -9 681.70 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 15 18 323 7.8 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 19 324 7.5 -9 681.80 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 20 324 8.0 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 21 324 7.5 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 22 327 7.3 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 23 324 7.7 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 24 325 8.1 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 15 25 322 8.1 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 26 323 7.8 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 27 324 7.7 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 28 322 7.9 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 29 324 8.1 -9 681.80 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 30 322 7.8 -9 681.80 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 31 324 7.8 -9 681.80 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 32 323 8.2 -9 681.80 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 33 323 8.0 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 15 34 322 7.9 -9 681.80 -40.6 -40.9 -40.7 70 -99 SPO 1997 04 07 15 35 322 7.7 -9 681.80 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 36 321 8.1 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 37 321 8.1 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 38 321 7.5 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 39 320 7.9 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 40 320 7.5 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 41 321 7.6 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 42 320 7.8 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 43 321 7.3 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 15 44 320 7.3 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 15 45 320 7.1 -9 681.80 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 15 46 319 7.2 -9 681.80 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 15 47 321 7.2 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 48 320 7.2 -9 681.90 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 49 319 6.8 -9 681.90 -40.5 -40.7 -40.5 70 -99 SPO 1997 04 07 15 50 319 6.6 -9 681.90 -40.5 -40.7 -40.5 70 -99 SPO 1997 04 07 15 51 319 6.6 -9 681.90 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 52 319 6.2 -9 681.90 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 15 53 318 6.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 54 318 5.9 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 55 318 5.7 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 56 319 5.9 -9 682.00 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 15 57 319 5.7 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 15 58 319 5.5 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 15 59 319 5.7 -9 682.00 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 16 00 319 6.0 -9 682.00 -40.4 -40.6 -40.4 72 0 SPO 1997 04 07 16 01 319 5.5 -9 682.00 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 02 322 5.3 -9 682.10 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 03 320 5.5 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 04 320 5.8 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 05 321 5.7 -9 682.10 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 16 06 320 5.3 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 07 319 5.4 -9 682.10 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 16 08 317 5.4 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 09 316 5.5 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 10 314 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 11 315 5.9 -9 682.00 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 12 317 5.8 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 13 317 6.2 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 14 316 6.3 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 15 316 6.0 -9 681.90 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 16 16 317 6.5 -9 681.90 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 17 317 6.0 -9 681.90 -40.5 -40.6 -40.5 70 -99 SPO 1997 04 07 16 18 317 6.3 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 19 317 6.5 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 20 318 6.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 21 317 6.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 22 316 6.2 -9 681.90 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 16 23 317 6.0 -9 682.00 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 24 316 5.9 -9 682.00 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 25 315 6.0 -9 682.00 -40.5 -40.5 -40.5 71 -99 SPO 1997 04 07 16 26 316 6.0 -9 682.00 -40.5 -40.5 -40.5 71 -99 SPO 1997 04 07 16 27 316 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 28 317 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 29 315 5.6 -9 682.00 -40.4 -40.4 -40.5 71 -99 SPO 1997 04 07 16 30 317 5.7 -9 682.00 -40.4 -40.4 -40.4 71 -99 SPO 1997 04 07 16 31 317 5.5 -9 682.00 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 32 318 5.3 -9 682.00 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 33 319 5.1 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 34 322 5.0 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 35 323 4.8 -9 682.10 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 16 36 323 4.7 -9 682.10 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 16 37 327 4.7 -9 682.10 -40.4 -40.6 -40.4 73 -99 SPO 1997 04 07 16 38 329 4.7 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 39 328 4.7 -9 682.00 -40.4 -40.7 -40.5 72 -99 SPO 1997 04 07 16 40 327 4.5 -9 682.00 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 16 41 325 4.7 -9 682.10 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 16 42 324 4.9 -9 682.00 -40.4 -40.7 -40.5 72 -99 SPO 1997 04 07 16 43 324 4.9 -9 682.00 -40.5 -40.7 -40.5 73 -99 SPO 1997 04 07 16 44 324 5.0 -9 682.00 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 16 45 325 5.0 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 46 324 5.2 -9 681.90 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 16 47 324 5.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 48 323 5.1 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 49 323 5.3 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 50 324 5.3 -9 681.80 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 16 51 325 5.2 -9 681.80 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 16 52 325 5.4 -9 681.90 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 16 53 325 5.3 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 54 327 5.2 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 55 327 4.8 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 56 328 4.7 -9 681.90 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 16 57 329 4.8 -9 682.00 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 16 58 329 4.7 -9 682.00 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 59 328 4.9 -9 682.00 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 17 00 328 4.9 -9 682.00 -40.6 -40.7 -40.6 71 0 SPO 1997 04 07 17 01 330 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 02 331 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 03 332 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 04 333 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 05 334 4.6 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 06 333 4.8 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 07 332 4.9 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 08 330 5.2 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 09 330 5.1 -9 681.90 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 17 10 329 5.5 -9 681.90 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 11 328 5.5 -9 681.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 12 327 5.8 -9 681.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 13 327 5.9 -9 681.90 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 14 325 6.2 -9 681.90 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 15 324 6.4 -9 681.90 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 16 323 6.5 -9 681.90 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 17 323 6.4 -9 681.80 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 18 324 6.5 -9 681.80 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 19 324 6.5 -9 681.80 -40.6 -40.7 -40.7 70 -99 SPO 1997 04 07 17 20 324 6.6 -9 681.80 -40.6 -40.8 -40.7 70 -99 SPO 1997 04 07 17 21 324 6.3 -9 681.80 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 22 324 6.2 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 23 324 6.1 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 24 325 6.2 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 25 325 6.3 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 17 26 324 6.2 -9 681.80 -40.6 -40.9 -40.6 71 -99 SPO 1997 04 07 17 27 324 6.2 -9 681.80 -40.6 -40.9 -40.6 71 -99 SPO 1997 04 07 17 28 325 5.9 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 17 29 325 5.9 -9 681.80 -40.6 -40.9 -40.6 70 -99 SPO 1997 04 07 17 30 325 5.9 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 31 325 5.6 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 32 323 5.7 -9 681.80 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 17 33 322 5.8 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 17 34 323 6.0 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 17 35 324 6.0 -9 681.70 -40.5 -40.8 -40.5 72 -99 SPO 1997 04 07 17 36 323 6.1 -9 681.70 -40.5 -40.7 -40.5 72 -99 SPO 1997 04 07 17 37 324 5.8 -9 681.70 -40.5 -40.7 -40.5 72 -99 SPO 1997 04 07 17 38 321 5.7 -9 681.70 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 17 39 320 5.9 -9 681.70 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 17 40 320 6.0 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 41 319 6.1 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 42 317 6.5 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 43 316 6.4 -9 681.70 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 17 44 317 6.6 -9 681.60 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 17 45 318 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 46 316 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 47 314 6.9 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 48 313 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 49 313 7.0 -9 681.60 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 17 50 313 7.0 -9 681.60 -40.3 -40.6 -40.3 72 -99 SPO 1997 04 07 17 51 314 6.7 -9 681.60 -40.3 -40.5 -40.4 72 -99 SPO 1997 04 07 17 52 313 7.1 -9 681.60 -40.3 -40.5 -40.4 72 -99 SPO 1997 04 07 17 53 312 7.1 -9 681.60 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 17 54 310 6.9 -9 681.60 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 17 55 311 6.7 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 56 312 7.2 -9 681.50 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 57 312 6.8 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 58 313 6.8 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 59 313 6.8 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 00 315 7.0 -9 681.60 -40.3 -40.5 -40.4 71 0 SPO 1997 04 07 18 01 316 7.1 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 02 314 7.0 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 03 313 7.2 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 04 312 6.7 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 05 314 6.6 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 06 314 6.6 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 07 313 7.0 -9 681.60 -40.3 -40.4 -40.3 72 -99 SPO 1997 04 07 18 08 313 6.7 -9 681.60 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 09 314 6.7 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 10 315 6.3 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 11 316 6.5 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 12 315 6.1 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 13 316 6.2 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 14 315 6.3 -9 681.50 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 18 15 316 6.3 -9 681.50 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 18 16 317 6.4 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 17 317 6.3 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 18 317 6.3 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 19 318 6.0 -9 681.50 -40.2 -40.2 -40.2 72 -99 SPO 1997 04 07 18 20 319 5.9 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 21 319 6.1 -9 681.50 -40.1 -40.3 -40.2 71 -99 SPO 1997 04 07 18 22 319 6.2 -9 681.50 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 23 320 6.5 -9 681.40 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 24 320 6.5 -9 681.40 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 25 319 6.5 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 26 319 6.2 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 27 319 6.0 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 28 321 6.3 -9 681.40 -40.0 -40.2 -40.1 71 -99 SPO 1997 04 07 18 29 322 6.1 -9 681.40 -40.0 -40.2 -40.1 71 -99 SPO 1997 04 07 18 30 322 6.1 -9 681.40 -40.0 -40.2 -40.0 71 -99 SPO 1997 04 07 18 31 321 6.2 -9 681.40 -40.0 -40.2 -40.0 72 -99 SPO 1997 04 07 18 32 321 6.3 -9 681.40 -39.9 -40.2 -40.0 71 -99 SPO 1997 04 07 18 33 320 6.2 -9 681.40 -39.9 -40.2 -40.0 72 -99 SPO 1997 04 07 18 34 321 5.9 -9 681.40 -39.9 -40.2 -39.9 71 -99 SPO 1997 04 07 18 35 318 6.4 -9 681.40 -39.8 -40.2 -39.9 72 -99 SPO 1997 04 07 18 36 318 6.4 -9 681.40 -39.8 -40.1 -39.9 72 -99 SPO 1997 04 07 18 37 317 6.5 -9 681.40 -39.8 -40.1 -39.9 72 -99 SPO 1997 04 07 18 38 318 6.2 -9 681.40 -39.8 -40.1 -39.8 70 -99 SPO 1997 04 07 18 39 318 5.9 -9 681.40 -39.8 -40.1 -39.8 69 -99 SPO 1997 04 07 18 40 317 6.0 -9 681.40 -39.8 -40.0 -39.8 70 -99 SPO 1997 04 07 18 41 314 6.6 -9 681.40 -39.7 -40.0 -39.8 70 -99 SPO 1997 04 07 18 42 313 6.6 -9 681.40 -39.7 -40.0 -39.8 71 -99 SPO 1997 04 07 18 43 315 5.8 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 44 316 5.9 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 45 317 5.4 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 46 318 5.4 -9 681.40 -39.7 -39.9 -39.7 71 -99 SPO 1997 04 07 18 47 319 5.3 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 18 48 320 5.3 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 18 49 318 5.3 -9 681.50 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 18 50 318 5.3 -9 681.50 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 18 51 317 5.6 -9 681.50 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 18 52 315 5.9 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 18 53 313 5.7 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 18 54 314 5.7 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 18 55 314 5.8 -9 681.40 -39.6 -40.0 -39.7 70 -99 SPO 1997 04 07 18 56 313 6.0 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 57 311 5.9 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 58 314 5.5 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 59 311 5.7 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 19 00 309 5.8 -9 681.40 -39.6 -40.0 -39.7 71 0 SPO 1997 04 07 19 01 310 5.3 -9 681.40 -39.7 -40.0 -39.7 72 -99 SPO 1997 04 07 19 02 309 5.9 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 03 310 5.5 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 04 310 5.7 -9 681.30 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 05 310 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 06 310 6.2 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 07 310 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 08 310 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 09 312 6.0 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 10 314 5.7 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 11 314 5.9 -9 681.30 -39.7 -39.9 -39.8 70 -99 SPO 1997 04 07 19 12 314 5.5 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 13 314 5.4 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 14 314 5.3 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 15 315 5.4 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 16 317 5.1 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 17 317 5.1 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 18 318 5.2 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 19 318 5.1 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 20 317 5.3 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 21 317 5.1 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 22 316 5.3 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 19 23 313 5.4 -9 681.40 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 19 24 312 5.4 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 25 311 5.7 -9 681.40 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 19 26 312 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 27 314 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 28 314 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 29 313 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 30 311 5.8 -9 681.40 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 19 31 310 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 32 310 5.8 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 33 310 6.0 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 34 312 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 35 312 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 36 312 5.8 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 37 311 5.7 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 38 310 5.6 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 39 310 5.7 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 40 310 5.6 -9 681.40 -39.7 -39.8 -39.8 71 -99 SPO 1997 04 07 19 41 312 5.6 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 42 312 5.8 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 43 310 6.0 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 44 309 5.7 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 45 311 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 46 309 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 47 308 5.8 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 48 308 5.7 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 49 310 5.5 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 50 311 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 51 311 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 52 311 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 53 310 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 54 310 5.2 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 55 312 5.3 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 56 312 5.0 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 57 312 5.2 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 58 314 5.2 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 59 316 5.1 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 20 00 317 4.9 -9 681.30 -39.8 -39.8 -39.8 72 0 SPO 1997 04 07 20 01 318 4.9 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 20 02 321 4.6 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 03 320 4.8 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 04 321 4.6 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 05 321 4.8 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 06 322 4.5 -9 681.30 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 20 07 322 4.5 -9 681.30 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 20 08 322 4.5 -9 681.30 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 20 09 320 4.5 -9 681.30 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 20 10 318 4.6 -9 681.30 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 20 11 316 4.5 -9 681.30 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 20 12 316 4.5 -9 681.30 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 20 13 314 5.0 -9 681.30 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 20 14 313 5.1 -9 681.30 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 20 15 314 5.2 -9 681.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 04 07 20 16 313 5.7 -9 681.30 -39.5 -39.7 -39.5 73 -99 SPO 1997 04 07 20 17 313 5.6 -9 681.30 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 20 18 311 5.5 -9 681.30 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 20 19 311 5.5 -9 681.30 -39.4 -39.6 -39.4 72 -99 SPO 1997 04 07 20 20 311 5.6 -9 681.30 -39.4 -39.6 -39.4 72 -99 SPO 1997 04 07 20 21 310 5.5 -9 681.30 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 20 22 311 5.3 -9 681.30 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 20 23 311 5.4 -9 681.30 -39.3 -39.5 -39.3 72 -99 SPO 1997 04 07 20 24 311 5.3 -9 681.30 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 20 25 312 4.9 -9 681.30 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 20 26 312 4.9 -9 681.30 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 20 27 312 4.8 -9 681.30 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 20 28 313 4.7 -9 681.30 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 20 29 314 4.5 -9 681.40 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 20 30 314 4.4 -9 681.40 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 20 31 313 4.4 -9 681.40 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 20 32 314 4.2 -9 681.40 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 20 33 316 4.3 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 34 315 4.3 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 35 315 3.9 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 36 312 4.1 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 37 313 4.3 -9 681.40 -39.0 -39.3 -39.0 72 -99 SPO 1997 04 07 20 38 312 4.5 -9 681.40 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 20 39 309 5.1 -9 681.30 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 20 40 310 5.3 -9 681.30 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 20 41 308 5.2 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 42 308 5.3 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 43 307 5.5 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 44 307 5.3 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 45 309 5.4 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 46 309 5.3 -9 681.30 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 20 47 309 4.9 -9 681.30 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 20 48 311 4.7 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 49 311 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 50 309 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 51 309 4.9 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 52 312 4.6 -9 681.30 -38.9 -39.0 -39.0 73 -99 SPO 1997 04 07 20 53 313 4.8 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 20 54 312 4.9 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 20 55 313 4.8 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 56 314 4.8 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 57 315 4.9 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 58 316 4.8 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 59 316 4.9 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 00 318 4.6 -9 681.30 -38.9 -39.2 -39.0 72 0 SPO 1997 04 07 21 01 319 4.9 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 02 321 4.7 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 03 321 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 04 322 4.6 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 05 321 4.5 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 06 321 4.7 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 07 321 4.7 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 21 08 322 4.6 -9 681.30 -39.0 -39.1 -39.0 71 -99 SPO 1997 04 07 21 09 321 4.6 -9 681.30 -39.0 -39.1 -39.0 71 -99 SPO 1997 04 07 21 10 321 4.8 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 11 319 5.0 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 12 320 4.8 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 13 319 4.8 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 14 319 5.0 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 15 319 4.7 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 16 320 4.7 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 17 319 4.7 -9 681.20 -39.1 -39.2 -39.2 71 -99 SPO 1997 04 07 21 18 318 4.9 -9 681.20 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 21 19 319 4.8 -9 681.20 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 21 20 319 5.0 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 21 321 4.8 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 22 322 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 23 321 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 24 322 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 25 323 4.8 -9 681.20 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 21 26 323 4.7 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 27 323 4.6 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 28 323 5.0 -9 681.30 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 29 324 4.8 -9 681.30 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 21 30 324 4.8 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 31 324 4.6 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 32 323 4.7 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 33 322 4.8 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 34 322 5.0 -9 681.20 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 21 35 321 4.8 -9 681.20 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 21 36 320 5.1 -9 681.20 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 21 37 320 5.1 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 38 318 5.1 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 39 318 5.2 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 40 317 5.2 -9 681.20 -39.0 -39.2 -39.1 70 -99 SPO 1997 04 07 21 41 315 5.3 -9 681.20 -39.0 -39.2 -39.0 71 -99 SPO 1997 04 07 21 42 315 5.3 -9 681.20 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 21 43 315 5.1 -9 681.20 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 21 44 314 5.5 -9 681.20 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 21 45 315 5.2 -9 681.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 46 315 5.1 -9 681.20 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 21 47 315 4.9 -9 681.20 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 21 48 314 5.1 -9 681.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 49 313 5.3 -9 681.20 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 50 314 4.9 -9 681.20 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 51 313 5.0 -9 681.20 -38.9 -39.1 -39.0 74 -99 SPO 1997 04 07 21 52 313 5.2 -9 681.20 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 21 53 313 5.2 -9 681.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 21 54 311 5.2 -9 681.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 21 55 312 5.2 -9 681.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 21 56 311 5.3 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 21 57 311 5.4 -9 681.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 21 58 310 5.2 -9 681.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 21 59 310 5.8 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 00 311 5.7 -9 681.20 -38.7 -38.9 -38.8 73 0 SPO 1997 04 07 22 01 311 5.3 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 02 308 5.5 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 03 307 5.6 -9 681.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 22 04 307 5.9 -9 681.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 22 05 307 5.5 -9 681.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 22 06 306 5.4 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 07 305 5.6 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 08 305 5.8 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 09 306 5.7 -9 681.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 22 10 306 5.5 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 11 306 5.5 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 12 305 5.6 -9 681.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 22 13 303 5.6 -9 681.20 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 22 14 304 5.6 -9 681.20 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 22 15 305 5.2 -9 681.10 -39.0 -39.0 -39.0 72 -99 SPO 1997 04 07 22 16 306 5.3 -9 681.10 -39.0 -39.0 -39.1 72 -99 SPO 1997 04 07 22 17 305 5.3 -9 681.10 -39.0 -39.0 -39.1 72 -99 SPO 1997 04 07 22 18 304 5.4 -9 681.10 -39.1 -39.0 -39.1 73 -99 SPO 1997 04 07 22 19 304 5.5 -9 681.10 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 07 22 20 304 5.4 -9 681.10 -39.1 -39.1 -39.2 72 -99 SPO 1997 04 07 22 21 305 5.4 -9 681.10 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 22 22 305 5.3 -9 681.10 -39.2 -39.1 -39.3 72 -99 SPO 1997 04 07 22 23 306 5.3 -9 681.10 -39.2 -39.1 -39.3 72 -99 SPO 1997 04 07 22 24 305 5.1 -9 681.10 -39.3 -39.1 -39.3 71 -99 SPO 1997 04 07 22 25 305 5.3 -9 681.10 -39.3 -39.1 -39.4 71 -99 SPO 1997 04 07 22 26 305 5.4 -9 681.10 -39.4 -39.1 -39.4 72 -99 SPO 1997 04 07 22 27 304 5.4 -9 681.10 -39.4 -39.1 -39.4 72 -99 SPO 1997 04 07 22 28 304 5.2 -9 681.10 -39.4 -39.2 -39.5 72 -99 SPO 1997 04 07 22 29 304 5.2 -9 681.10 -39.5 -39.2 -39.5 72 -99 SPO 1997 04 07 22 30 304 5.3 -9 681.10 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 22 31 306 5.2 -9 681.10 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 22 32 306 5.1 -9 681.10 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 22 33 307 5.0 -9 681.10 -39.6 -39.4 -39.7 72 -99 SPO 1997 04 07 22 34 307 5.0 -9 681.10 -39.7 -39.4 -39.7 72 -99 SPO 1997 04 07 22 35 308 4.9 -9 681.10 -39.7 -39.4 -39.8 72 -99 SPO 1997 04 07 22 36 308 5.0 -9 681.10 -39.8 -39.5 -39.8 72 -99 SPO 1997 04 07 22 37 307 5.1 -9 681.10 -39.8 -39.5 -39.9 72 -99 SPO 1997 04 07 22 38 307 5.0 -9 681.10 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 22 39 308 5.1 -9 681.10 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 22 40 308 5.0 -9 681.10 -40.0 -39.5 -40.0 71 -99 SPO 1997 04 07 22 41 307 5.1 -9 681.10 -40.0 -39.5 -40.1 71 -99 SPO 1997 04 07 22 42 308 5.1 -9 681.10 -40.1 -39.5 -40.1 71 -99 SPO 1997 04 07 22 43 307 5.1 -9 681.10 -40.1 -39.5 -40.1 71 -99 SPO 1997 04 07 22 44 307 5.2 -9 681.10 -40.1 -39.5 -40.2 71 -99 SPO 1997 04 07 22 45 308 5.2 -9 681.10 -40.1 -39.5 -40.2 71 -99 SPO 1997 04 07 22 46 308 5.2 -9 681.10 -40.2 -39.5 -40.2 71 -99 SPO 1997 04 07 22 47 308 5.4 -9 681.10 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 22 48 307 5.5 -9 681.10 -40.2 -39.5 -40.2 73 -99 SPO 1997 04 07 22 49 306 5.6 -9 681.10 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 22 50 305 5.7 -9 681.10 -40.2 -39.5 -40.2 71 -99 SPO 1997 04 07 22 51 304 6.1 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 52 303 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 53 303 6.0 -9 681.10 -40.1 -39.4 -40.1 71 -99 SPO 1997 04 07 22 54 304 6.0 -9 681.10 -40.1 -39.4 -40.2 71 -99 SPO 1997 04 07 22 55 304 5.9 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 56 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 57 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 58 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 59 305 5.8 -9 681.00 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 23 00 306 5.8 -9 681.00 -40.2 -39.5 -40.3 71 0 SPO 1997 04 07 23 01 306 5.8 -9 681.00 -40.3 -39.5 -40.4 71 -99 SPO 1997 04 07 23 02 305 5.8 -9 681.00 -40.4 -39.5 -40.4 72 -99 SPO 1997 04 07 23 03 306 5.7 -9 681.00 -40.4 -39.5 -40.5 71 -99 SPO 1997 04 07 23 04 306 5.8 -9 681.00 -40.5 -39.5 -40.5 72 -99 SPO 1997 04 07 23 05 306 5.7 -9 681.00 -40.5 -39.5 -40.5 72 -99 SPO 1997 04 07 23 06 307 5.8 -9 681.00 -40.5 -39.5 -40.6 72 -99 SPO 1997 04 07 23 07 307 5.7 -9 681.00 -40.5 -39.6 -40.6 70 -99 SPO 1997 04 07 23 08 308 5.7 -9 681.10 -40.6 -39.6 -40.6 71 -99 SPO 1997 04 07 23 09 308 5.7 -9 681.10 -40.6 -39.7 -40.6 71 -99 SPO 1997 04 07 23 10 309 5.7 -9 681.10 -40.6 -39.7 -40.6 70 -99 SPO 1997 04 07 23 11 309 5.7 -9 681.10 -40.6 -39.7 -40.6 70 -99 SPO 1997 04 07 23 12 311 5.3 -9 681.00 -40.6 -39.7 -40.6 71 -99 SPO 1997 04 07 23 13 311 5.2 -9 681.00 -40.6 -39.7 -40.6 72 -99 SPO 1997 04 07 23 14 312 5.2 -9 681.00 -40.6 -39.7 -40.6 72 -99 SPO 1997 04 07 23 15 312 5.0 -9 681.00 -40.6 -39.8 -40.6 72 -99 SPO 1997 04 07 23 16 312 5.1 -9 681.00 -40.6 -39.8 -40.6 71 -99 SPO 1997 04 07 23 17 313 5.1 -9 681.00 -40.6 -39.9 -40.7 71 -99 SPO 1997 04 07 23 18 313 5.1 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 19 314 4.9 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 20 315 4.9 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 21 316 4.8 -9 681.00 -40.7 -40.1 -40.7 71 -99 SPO 1997 04 07 23 22 316 4.8 -9 681.00 -40.7 -40.1 -40.8 71 -99 SPO 1997 04 07 23 23 316 4.8 -9 681.00 -40.7 -40.1 -40.8 71 -99 SPO 1997 04 07 23 24 316 4.8 -9 681.00 -40.7 -40.1 -40.8 70 -99 SPO 1997 04 07 23 25 317 4.7 -9 681.00 -40.7 -40.1 -40.7 70 -99 SPO 1997 04 07 23 26 317 4.6 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 27 319 4.6 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 28 320 4.5 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 29 320 4.5 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 30 319 4.6 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 31 319 4.5 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 32 320 4.5 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 33 320 4.5 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 34 321 4.4 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 35 321 4.5 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 36 322 4.4 -9 681.00 -40.7 -40.3 -40.7 71 -99 SPO 1997 04 07 23 37 323 4.5 -9 681.00 -40.7 -40.3 -40.7 71 -99 SPO 1997 04 07 23 38 323 4.5 -9 681.00 -40.7 -40.3 -40.8 71 -99 SPO 1997 04 07 23 39 323 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 40 323 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 41 322 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 42 321 4.5 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 43 320 4.4 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 44 318 4.5 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 45 317 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 46 316 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 47 315 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 48 314 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 49 313 4.8 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 50 314 4.8 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 51 314 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 52 315 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 53 318 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 54 320 4.7 -9 680.90 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 55 320 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 56 320 4.7 -9 681.00 -40.7 -40.4 -40.8 71 -99 SPO 1997 04 07 23 57 321 4.6 -9 680.90 -40.7 -40.3 -40.8 71 -99 SPO 1997 04 07 23 58 322 4.6 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 07 23 59 323 4.7 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 08 00 00 324 4.6 -9 680.90 -40.7 -40.3 -40.8 -99 0 SPO 1997 04 08 00 01 325 4.8 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 08 00 02 325 4.7 -9 680.90 -40.7 -40.4 -40.8 -99 -99 SPO 1997 04 08 00 03 325 4.7 -9 680.90 -40.7 -40.4 -40.8 -99 -99 SPO 1997 04 08 00 04 325 4.7 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 05 325 4.9 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 06 323 5.1 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 07 323 5.0 -9 680.90 -40.7 -40.5 -40.7 -99 -99 SPO 1997 04 08 00 08 323 5.2 -9 680.90 -40.7 -40.5 -40.7 -99 -99 SPO 1997 04 08 00 09 323 5.0 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 10 324 5.0 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 11 324 5.1 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 12 326 4.9 -9 681.00 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 13 327 5.0 -9 680.90 -40.6 -40.4 -40.7 71 -99 SPO 1997 04 08 00 14 328 5.1 -9 680.90 -40.6 -40.4 -40.6 71 -99 SPO 1997 04 08 00 15 329 5.0 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 16 330 4.9 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 17 329 4.9 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 18 330 4.8 -9 680.90 -40.6 -40.3 -40.6 72 -99 SPO 1997 04 08 00 19 331 4.8 -9 680.90 -40.5 -40.4 -40.6 72 -99 SPO 1997 04 08 00 20 332 4.8 -9 680.90 -40.5 -40.4 -40.6 71 -99 SPO 1997 04 08 00 21 334 5.0 -9 680.90 -40.5 -40.4 -40.6 70 -99 SPO 1997 04 08 00 22 334 5.0 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 23 333 4.8 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 24 333 5.0 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 25 332 4.9 -9 681.00 -40.5 -40.4 -40.6 70 -99 SPO 1997 04 08 00 26 332 5.1 -9 681.00 -40.5 -40.4 -40.6 71 -99 SPO 1997 04 08 00 27 334 5.0 -9 681.00 -40.6 -40.5 -40.6 72 -99 SPO 1997 04 08 00 28 335 5.0 -9 680.90 -40.6 -40.5 -40.6 72 -99 SPO 1997 04 08 00 29 334 4.8 -9 681.00 -40.6 -40.5 -40.7 73 -99 SPO 1997 04 08 00 30 333 4.8 -9 681.00 -40.6 -40.5 -40.7 72 -99 SPO 1997 04 08 00 31 332 4.9 -9 681.00 -40.6 -40.6 -40.7 71 -99 SPO 1997 04 08 00 32 333 5.0 -9 681.00 -40.7 -40.5 -40.7 71 -99 SPO 1997 04 08 00 33 335 5.2 -9 681.00 -40.7 -40.6 -40.8 71 -99 SPO 1997 04 08 00 34 336 5.1 -9 681.00 -40.7 -40.5 -40.8 71 -99 SPO 1997 04 08 00 35 335 5.1 -9 681.00 -40.8 -40.6 -40.8 71 -99 SPO 1997 04 08 00 36 334 5.1 -9 681.00 -40.8 -40.5 -40.9 70 -99 SPO 1997 04 08 00 37 334 5.0 -9 681.00 -40.8 -40.6 -40.9 70 -99 SPO 1997 04 08 00 38 335 5.1 -9 681.00 -40.8 -40.6 -40.9 70 -99 SPO 1997 04 08 00 39 336 5.0 -9 681.00 -40.9 -40.6 -41.0 71 -99 SPO 1997 04 08 00 40 336 5.2 -9 681.00 -40.9 -40.6 -41.0 71 -99 SPO 1997 04 08 00 41 335 5.2 -9 681.00 -41.0 -40.5 -41.0 71 -99 SPO 1997 04 08 00 42 335 5.2 -9 680.90 -41.0 -40.5 -41.1 70 -99 SPO 1997 04 08 00 43 337 5.2 -9 680.90 -41.0 -40.5 -41.1 70 -99 SPO 1997 04 08 00 44 338 5.0 -9 680.90 -41.1 -40.5 -41.1 70 -99 SPO 1997 04 08 00 45 339 5.1 -9 680.90 -41.1 -40.5 -41.2 70 -99 SPO 1997 04 08 00 46 338 5.2 -9 680.90 -41.2 -40.6 -41.2 70 -99 SPO 1997 04 08 00 47 338 5.2 -9 680.90 -41.2 -40.6 -41.3 70 -99 SPO 1997 04 08 00 48 337 5.3 -9 680.90 -41.2 -40.6 -41.2 69 -99 SPO 1997 04 08 00 49 337 5.4 -9 680.90 -41.3 -40.6 -41.4 70 -99 SPO 1997 04 08 00 50 337 5.4 -9 680.90 -41.4 -40.7 -41.4 70 -99 SPO 1997 04 08 00 51 337 5.4 -9 680.90 -41.4 -40.7 -41.5 70 -99 SPO 1997 04 08 00 52 337 5.2 -9 680.90 -41.5 -40.7 -41.5 70 -99 SPO 1997 04 08 00 53 339 5.1 -9 680.90 -41.5 -40.7 -41.6 70 -99 SPO 1997 04 08 00 54 339 5.1 -9 680.90 -41.6 -40.7 -41.6 70 -99 SPO 1997 04 08 00 55 340 5.3 -9 680.90 -41.6 -40.7 -41.7 70 -99 SPO 1997 04 08 00 56 340 5.4 -9 680.90 -41.7 -40.8 -41.8 70 -99 SPO 1997 04 08 00 57 339 5.4 -9 680.90 -41.7 -40.7 -41.8 70 -99 SPO 1997 04 08 00 58 339 5.4 -9 680.90 -41.8 -40.8 -41.8 70 -99 SPO 1997 04 08 00 59 338 5.3 -9 680.90 -41.8 -40.8 -41.8 70 -99 SPO 1997 04 08 01 00 337 5.4 -9 680.90 -41.9 -40.8 -41.9 70 0 SPO 1997 04 08 01 01 337 5.5 -9 680.90 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 01 02 337 5.4 -9 680.90 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 01 03 338 5.4 -9 680.90 -41.9 -40.8 -42.0 70 -99 SPO 1997 04 08 01 04 338 5.4 -9 680.90 -42.0 -40.8 -42.0 69 -99 SPO 1997 04 08 01 05 338 5.4 -9 680.90 -42.0 -40.7 -42.0 69 -99 SPO 1997 04 08 01 06 338 5.4 -9 680.90 -42.0 -40.7 -42.1 69 -99 SPO 1997 04 08 01 07 340 5.3 -9 680.90 -42.1 -40.8 -42.1 69 -99 SPO 1997 04 08 01 08 341 5.4 -9 680.90 -42.2 -40.8 -42.2 70 -99 SPO 1997 04 08 01 09 341 5.5 -9 680.80 -42.2 -40.8 -42.2 70 -99 SPO 1997 04 08 01 10 339 5.5 -9 680.80 -42.1 -40.8 -42.2 69 -99 SPO 1997 04 08 01 11 338 5.6 -9 680.80 -42.1 -40.8 -42.2 67 -99 SPO 1997 04 08 01 12 337 5.6 -9 680.80 -42.2 -40.8 -42.2 68 -99 SPO 1997 04 08 01 13 337 5.6 -9 680.80 -42.2 -40.8 -42.1 69 -99 SPO 1997 04 08 01 14 336 5.7 -9 680.70 -42.1 -40.9 -42.2 69 -99 SPO 1997 04 08 01 15 335 5.7 -9 680.70 -42.2 -40.9 -42.2 70 -99 SPO 1997 04 08 01 16 333 5.8 -9 680.70 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 17 332 5.7 -9 680.70 -42.1 -41.0 -42.1 71 -99 SPO 1997 04 08 01 18 331 5.6 -9 680.70 -42.1 -41.0 -42.1 70 -99 SPO 1997 04 08 01 19 331 5.6 -9 680.70 -42.1 -41.0 -42.1 69 -99 SPO 1997 04 08 01 20 331 5.6 -9 680.70 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 21 331 5.4 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 22 332 5.4 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 23 330 5.1 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 24 329 5.0 -9 680.80 -42.1 -40.9 -42.2 69 -99 SPO 1997 04 08 01 25 327 4.8 -9 680.80 -42.2 -41.0 -42.2 70 -99 SPO 1997 04 08 01 26 329 4.8 -9 680.80 -42.2 -40.9 -42.3 71 -99 SPO 1997 04 08 01 27 330 4.8 -9 680.80 -42.2 -40.9 -42.3 70 -99 SPO 1997 04 08 01 28 332 4.8 -9 680.80 -42.3 -41.0 -42.3 71 -99 SPO 1997 04 08 01 29 332 4.7 -9 680.80 -42.3 -41.0 -42.4 70 -99 SPO 1997 04 08 01 30 334 4.8 -9 680.80 -42.4 -40.9 -42.4 71 -99 SPO 1997 04 08 01 31 336 4.8 -9 680.80 -42.3 -40.9 -42.3 69 -99 SPO 1997 04 08 01 32 339 4.4 -9 680.80 -42.2 -40.9 -42.3 68 -99 SPO 1997 04 08 01 33 341 4.4 -9 680.80 -42.4 -41.0 -42.5 69 -99 SPO 1997 04 08 01 34 341 4.3 -9 680.80 -42.4 -41.0 -42.6 67 -99 SPO 1997 04 08 01 35 343 4.4 -9 680.80 -42.5 -41.1 -42.6 68 -99 SPO 1997 04 08 01 36 343 4.3 -9 680.80 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 01 37 343 4.4 -9 680.80 -42.7 -41.2 -42.7 70 -99 SPO 1997 04 08 01 38 343 4.5 -9 680.80 -42.7 -41.2 -42.7 69 -99 SPO 1997 04 08 01 39 344 4.6 -9 680.80 -42.7 -41.2 -42.8 69 -99 SPO 1997 04 08 01 40 343 4.8 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 41 340 4.9 -9 680.80 -42.8 -41.2 -42.8 69 -99 SPO 1997 04 08 01 42 339 4.8 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 43 337 4.9 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 44 339 5.0 -9 680.80 -42.8 -41.3 -42.7 69 -99 SPO 1997 04 08 01 45 340 5.1 -9 680.80 -42.7 -41.3 -42.7 69 -99 SPO 1997 04 08 01 46 341 5.1 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 47 344 4.7 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 48 341 4.7 -9 680.80 -42.9 -41.4 -43.0 69 -99 SPO 1997 04 08 01 49 339 4.9 -9 680.70 -42.9 -41.4 -43.0 68 -99 SPO 1997 04 08 01 50 338 4.9 -9 680.80 -43.0 -41.4 -43.0 69 -99 SPO 1997 04 08 01 51 338 5.1 -9 680.70 -42.8 -41.3 -42.9 68 -99 SPO 1997 04 08 01 52 338 5.0 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 53 340 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 54 342 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 55 346 4.6 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 01 56 339 4.7 -9 680.70 -42.8 -41.4 -42.9 69 -99 SPO 1997 04 08 01 57 337 4.9 -9 680.70 -42.8 -41.4 -43.0 68 -99 SPO 1997 04 08 01 58 333 5.0 -9 680.70 -42.9 -41.4 -42.9 69 -99 SPO 1997 04 08 01 59 332 5.0 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 02 00 332 5.0 -9 680.70 -42.8 -41.4 -42.8 69 0 SPO 1997 04 08 02 01 333 4.9 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 02 02 335 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 03 338 4.9 -9 680.60 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 04 339 4.8 -9 680.60 -42.8 -41.3 -42.9 69 -99 SPO 1997 04 08 02 05 339 4.7 -9 680.60 -42.8 -41.3 -42.9 69 -99 SPO 1997 04 08 02 06 337 5.0 -9 680.60 -42.9 -41.3 -43.0 70 -99 SPO 1997 04 08 02 07 334 5.1 -9 680.60 -42.9 -41.3 -43.0 69 -99 SPO 1997 04 08 02 08 331 5.2 -9 680.60 -42.9 -41.3 -43.0 69 -99 SPO 1997 04 08 02 09 331 5.3 -9 680.60 -42.9 -41.3 -42.9 69 -99 SPO 1997 04 08 02 10 330 5.3 -9 680.60 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 11 330 5.3 -9 680.60 -42.8 -41.2 -42.7 69 -99 SPO 1997 04 08 02 12 331 5.2 -9 680.60 -42.8 -41.2 -42.7 70 -99 SPO 1997 04 08 02 13 331 5.1 -9 680.60 -42.7 -41.2 -42.7 69 -99 SPO 1997 04 08 02 14 333 5.1 -9 680.60 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 02 15 337 5.0 -9 680.60 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 02 16 338 4.9 -9 680.60 -42.6 -41.3 -42.7 69 -99 SPO 1997 04 08 02 17 338 4.8 -9 680.60 -42.6 -41.2 -42.6 69 -99 SPO 1997 04 08 02 18 340 4.7 -9 680.60 -42.6 -41.2 -42.6 68 -99 SPO 1997 04 08 02 19 342 4.6 -9 680.50 -42.6 -41.3 -42.6 69 -99 SPO 1997 04 08 02 20 343 4.8 -9 680.50 -42.6 -41.4 -42.6 69 -99 SPO 1997 04 08 02 21 341 5.0 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 22 340 4.9 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 23 338 5.0 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 24 338 5.2 -9 680.50 -42.6 -41.4 -42.6 69 -99 SPO 1997 04 08 02 25 339 5.2 -9 680.50 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 26 339 5.1 -9 680.50 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 27 341 5.0 -9 680.50 -42.4 -41.4 -42.4 69 -99 SPO 1997 04 08 02 28 344 4.8 -9 680.50 -42.4 -41.4 -42.4 69 -99 SPO 1997 04 08 02 29 347 4.7 -9 680.50 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 30 346 4.6 -9 680.50 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 31 344 4.7 -9 680.50 -42.4 -41.5 -42.5 68 -99 SPO 1997 04 08 02 32 344 4.7 -9 680.50 -42.4 -41.4 -42.5 68 -99 SPO 1997 04 08 02 33 345 4.7 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 34 346 4.8 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 35 343 4.9 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 36 341 4.8 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 37 341 4.8 -9 680.40 -42.4 -41.3 -42.5 69 -99 SPO 1997 04 08 02 38 347 4.7 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 39 351 4.7 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 40 350 4.8 -9 680.40 -42.4 -41.4 -42.6 69 -99 SPO 1997 04 08 02 41 349 4.8 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 42 351 4.8 -9 680.30 -42.5 -41.5 -42.5 70 -99 SPO 1997 04 08 02 43 352 4.7 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 44 350 4.8 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 45 348 5.0 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 46 348 5.0 -9 680.30 -42.5 -41.5 -42.6 69 -99 SPO 1997 04 08 02 47 348 4.9 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 48 350 4.7 -9 680.30 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 49 353 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 50 350 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 51 348 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 52 350 4.8 -9 680.30 -42.3 -41.4 -42.3 69 -99 SPO 1997 04 08 02 53 349 4.7 -9 680.30 -42.3 -41.4 -42.3 70 -99 SPO 1997 04 08 02 54 348 4.7 -9 680.30 -42.3 -41.5 -42.3 70 -99 SPO 1997 04 08 02 55 349 4.8 -9 680.30 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 02 56 351 4.8 -9 680.30 -42.2 -41.5 -42.2 69 -99 SPO 1997 04 08 02 57 353 4.8 -9 680.30 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 02 58 353 4.7 -9 680.30 -42.2 -41.6 -42.3 70 -99 SPO 1997 04 08 02 59 349 4.9 -9 680.30 -42.3 -41.6 -42.3 70 -99 SPO 1997 04 08 03 00 348 4.7 -9 680.30 -42.2 -41.6 -42.3 69 0 SPO 1997 04 08 03 01 348 4.7 -9 680.30 -42.2 -41.6 -42.3 68 -99 SPO 1997 04 08 03 02 347 4.7 -9 680.30 -42.2 -41.6 -42.4 68 -99 SPO 1997 04 08 03 03 345 4.9 -9 680.20 -42.3 -41.7 -42.4 70 -99 SPO 1997 04 08 03 04 344 5.2 -9 680.20 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 03 05 342 5.3 -9 680.20 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 03 06 341 5.5 -9 680.20 -42.3 -41.5 -42.3 71 -99 SPO 1997 04 08 03 07 341 5.6 -9 680.20 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 03 08 341 5.7 -9 680.10 -42.2 -41.4 -42.2 70 -99 SPO 1997 04 08 03 09 344 5.7 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 10 345 5.6 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 11 345 5.5 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 12 345 5.6 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 13 345 5.5 -9 680.10 -42.2 -41.6 -42.3 69 -99 SPO 1997 04 08 03 14 343 5.3 -9 680.10 -42.2 -41.7 -42.3 68 -99 SPO 1997 04 08 03 15 341 5.4 -9 680.10 -42.3 -41.7 -42.4 69 -99 SPO 1997 04 08 03 16 339 5.3 -9 680.10 -42.3 -41.8 -42.3 68 -99 SPO 1997 04 08 03 17 342 5.3 -9 680.10 -42.2 -41.8 -42.3 68 -99 SPO 1997 04 08 03 18 342 5.3 -9 680.10 -42.2 -41.7 -42.3 69 -99 SPO 1997 04 08 03 19 340 5.2 -9 680.10 -42.3 -41.6 -42.4 70 -99 SPO 1997 04 08 03 20 343 5.2 -9 680.10 -42.4 -41.3 -42.4 71 -99 SPO 1997 04 08 03 21 346 5.1 -9 680.10 -42.4 -41.4 -42.5 71 -99 SPO 1997 04 08 03 22 345 5.2 -9 680.10 -42.4 -41.4 -42.5 71 -99 SPO 1997 04 08 03 23 342 5.1 -9 680.10 -42.4 -41.2 -42.5 71 -99 SPO 1997 04 08 03 24 345 5.1 -9 680.10 -42.4 -41.0 -42.4 71 -99 SPO 1997 04 08 03 25 346 4.9 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 26 346 4.9 -9 680.10 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 03 27 345 5.2 -9 680.10 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 03 28 344 5.4 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 29 344 5.3 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 30 345 5.1 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 31 346 5.3 -9 680.00 -42.4 -41.0 -42.4 71 -99 SPO 1997 04 08 03 32 345 5.3 -9 680.00 -42.4 -41.1 -42.4 71 -99 SPO 1997 04 08 03 33 343 5.6 -9 680.00 -42.3 -41.0 -42.3 69 -99 SPO 1997 04 08 03 34 344 5.5 -9 680.00 -42.3 -41.0 -42.2 69 -99 SPO 1997 04 08 03 35 345 5.3 -9 680.00 -42.2 -41.2 -42.2 70 -99 SPO 1997 04 08 03 36 346 5.2 -9 680.00 -42.2 -41.3 -42.2 70 -99 SPO 1997 04 08 03 37 346 5.0 -9 680.00 -42.2 -41.3 -42.2 71 -99 SPO 1997 04 08 03 38 348 4.8 -9 680.10 -42.1 -41.4 -42.2 70 -99 SPO 1997 04 08 03 39 349 4.7 -9 680.10 -42.1 -41.4 -42.2 69 -99 SPO 1997 04 08 03 40 348 4.8 -9 680.00 -42.2 -41.4 -42.3 70 -99 SPO 1997 04 08 03 41 349 4.7 -9 680.00 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 42 348 4.8 -9 680.00 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 43 349 4.4 -9 680.10 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 44 352 4.6 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 45 352 4.6 -9 680.10 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 03 46 350 4.4 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 47 346 4.5 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 48 346 4.9 -9 680.10 -42.3 -41.4 -42.3 70 -99 SPO 1997 04 08 03 49 346 4.7 -9 680.10 -42.2 -41.4 -42.2 70 -99 SPO 1997 04 08 03 50 349 4.8 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 51 348 4.6 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 52 347 4.6 -9 680.10 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 03 53 348 4.8 -9 680.10 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 03 54 347 5.0 -9 680.00 -42.3 -41.7 -42.4 70 -99 SPO 1997 04 08 03 55 347 4.9 -9 680.00 -42.3 -41.7 -42.4 69 -99 SPO 1997 04 08 03 56 347 4.7 -9 680.00 -42.3 -41.8 -42.4 68 -99 SPO 1997 04 08 03 57 348 4.3 -9 680.00 -42.3 -41.9 -42.4 69 -99 SPO 1997 04 08 03 58 348 4.6 -9 680.00 -42.4 -42.0 -42.5 69 -99 SPO 1997 04 08 03 59 347 4.8 -9 680.00 -42.4 -41.9 -42.5 69 -99 SPO 1997 04 08 04 00 347 5.0 -9 680.00 -42.4 -41.9 -42.5 69 0 SPO 1997 04 08 04 01 346 5.5 -9 680.00 -42.4 -41.9 -42.4 69 -99 SPO 1997 04 08 04 02 345 5.8 -9 679.90 -42.4 -41.8 -42.4 69 -99 SPO 1997 04 08 04 03 344 6.3 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 04 344 6.3 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 05 346 6.4 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 06 347 6.3 -9 679.90 -42.4 -41.8 -42.5 69 -99 SPO 1997 04 08 04 07 348 6.3 -9 679.90 -42.4 -41.8 -42.6 69 -99 SPO 1997 04 08 04 08 349 6.2 -9 679.90 -42.5 -41.8 -42.6 70 -99 SPO 1997 04 08 04 09 348 6.2 -9 679.80 -42.5 -41.8 -42.6 69 -99 SPO 1997 04 08 04 10 348 6.1 -9 679.80 -42.5 -41.8 -42.6 68 -99 SPO 1997 04 08 04 11 348 6.2 -9 679.80 -42.6 -41.9 -42.6 69 -99 SPO 1997 04 08 04 12 349 6.1 -9 679.80 -42.6 -41.9 -42.6 69 -99 SPO 1997 04 08 04 13 348 6.1 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 14 348 6.1 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 15 347 6.2 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 16 346 6.3 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 17 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 18 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 19 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 20 346 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 21 345 6.5 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 22 344 6.4 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 23 345 6.4 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 24 346 6.3 -9 679.80 -42.6 -42.0 -42.7 68 -99 SPO 1997 04 08 04 25 346 6.2 -9 679.80 -42.7 -42.0 -42.7 69 -99 SPO 1997 04 08 04 26 346 6.2 -9 679.80 -42.6 -42.0 -42.7 68 -99 SPO 1997 04 08 04 27 346 6.2 -9 679.80 -42.6 -42.0 -42.6 69 -99 SPO 1997 04 08 04 28 345 6.0 -9 679.80 -42.5 -42.0 -42.7 69 -99 SPO 1997 04 08 04 29 346 6.1 -9 679.80 -42.6 -42.1 -42.6 69 -99 SPO 1997 04 08 04 30 345 6.2 -9 679.80 -42.5 -42.1 -42.6 67 -99 SPO 1997 04 08 04 31 343 6.3 -9 679.80 -42.5 -42.0 -42.6 68 -99 SPO 1997 04 08 04 32 343 6.3 -9 679.80 -42.5 -41.9 -42.6 69 -99 SPO 1997 04 08 04 33 344 6.5 -9 679.80 -42.5 -41.8 -42.6 69 -99 SPO 1997 04 08 04 34 344 6.2 -9 679.90 -42.5 -41.9 -42.6 69 -99 SPO 1997 04 08 04 35 346 5.9 -9 679.90 -42.5 -42.0 -42.6 69 -99 SPO 1997 04 08 04 36 347 5.7 -9 679.90 -42.5 -42.1 -42.5 69 -99 SPO 1997 04 08 04 37 347 5.7 -9 679.90 -42.5 -42.2 -42.5 69 -99 SPO 1997 04 08 04 38 344 5.8 -9 679.90 -42.5 -42.3 -42.5 67 -99 SPO 1997 04 08 04 39 343 5.9 -9 679.90 -42.4 -42.2 -42.5 66 -99 SPO 1997 04 08 04 40 343 6.2 -9 679.90 -42.4 -42.0 -42.5 67 -99 SPO 1997 04 08 04 41 343 6.1 -9 679.90 -42.4 -42.0 -42.5 68 -99 SPO 1997 04 08 04 42 345 5.6 -9 679.90 -42.4 -42.2 -42.5 69 -99 SPO 1997 04 08 04 43 348 5.6 -9 679.90 -42.4 -42.2 -42.5 69 -99 SPO 1997 04 08 04 44 349 5.4 -9 679.90 -42.4 -42.3 -42.5 69 -99 SPO 1997 04 08 04 45 349 5.3 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 46 349 5.3 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 47 350 5.6 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 48 348 5.7 -9 679.80 -42.4 -42.2 -42.4 69 -99 SPO 1997 04 08 04 49 346 5.8 -9 679.80 -42.4 -42.0 -42.4 69 -99 SPO 1997 04 08 04 50 346 6.2 -9 679.80 -42.3 -41.8 -42.4 70 -99 SPO 1997 04 08 04 51 348 5.8 -9 679.90 -42.2 -41.8 -42.4 68 -99 SPO 1997 04 08 04 52 349 5.5 -9 679.90 -42.3 -41.9 -42.4 69 -99 SPO 1997 04 08 04 53 349 5.1 -9 679.90 -42.3 -42.1 -42.4 69 -99 SPO 1997 04 08 04 54 351 5.1 -9 679.90 -42.3 -42.3 -42.4 69 -99 SPO 1997 04 08 04 55 349 5.0 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 56 347 5.3 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 57 346 5.2 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 58 346 5.3 -9 679.90 -42.3 -42.2 -42.4 70 -99 SPO 1997 04 08 04 59 346 5.7 -9 679.90 -42.3 -42.1 -42.3 71 -99 SPO 1997 04 08 05 00 346 5.7 -9 679.80 -42.2 -42.2 -42.3 70 0 SPO 1997 04 08 05 01 346 5.6 -9 679.80 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 08 05 02 344 5.0 -9 679.90 -42.3 -42.3 -42.4 71 -99 SPO 1997 04 08 05 03 344 5.0 -9 679.90 -42.3 -42.4 -42.4 70 -99 SPO 1997 04 08 05 04 345 5.1 -9 679.90 -42.3 -42.3 -42.3 70 -99 SPO 1997 04 08 05 05 349 4.8 -9 679.90 -42.2 -42.1 -42.3 69 -99 SPO 1997 04 08 05 06 346 4.8 -9 679.90 -42.2 -42.2 -42.3 69 -99 SPO 1997 04 08 05 07 347 4.3 -9 679.90 -42.2 -42.2 -42.2 69 -99 SPO 1997 04 08 05 08 345 4.7 -9 679.90 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 08 05 09 343 4.6 -9 679.90 -42.2 -42.3 -42.2 70 -99 SPO 1997 04 08 05 10 343 4.8 -9 679.90 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 08 05 11 344 5.3 -9 679.90 -42.2 -42.1 -42.2 70 -99 SPO 1997 04 08 05 12 342 4.9 -9 679.80 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 08 05 13 342 5.0 -9 679.80 -42.0 -42.2 -42.2 69 -99 SPO 1997 04 08 05 14 343 4.8 -9 679.80 -42.0 -42.2 -42.2 69 -99 SPO 1997 04 08 05 15 345 5.0 -9 679.80 -42.1 -42.3 -42.2 70 -99 SPO 1997 04 08 05 16 344 4.7 -9 679.80 -42.1 -42.3 -42.2 70 -99 SPO 1997 04 08 05 17 345 4.8 -9 679.80 -42.1 -42.4 -42.2 71 -99 SPO 1997 04 08 05 18 343 4.7 -9 679.80 -42.1 -42.3 -42.2 71 -99 SPO 1997 04 08 05 19 345 4.5 -9 679.80 -42.1 -42.2 -42.1 69 -99 SPO 1997 04 08 05 20 347 4.2 -9 679.80 -42.1 -42.3 -42.1 69 -99 SPO 1997 04 08 05 21 349 4.7 -9 679.80 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 08 05 22 347 4.6 -9 679.70 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 08 05 23 344 4.4 -9 679.70 -42.0 -42.2 -42.1 69 -99 SPO 1997 04 08 05 24 344 4.1 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 25 346 4.3 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 26 348 4.2 -9 679.70 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 27 346 4.6 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 28 345 4.7 -9 679.70 -42.0 -42.2 -42.1 71 -99 SPO 1997 04 08 05 29 345 4.6 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 30 345 5.0 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 31 345 5.1 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 32 342 5.3 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 33 341 5.3 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 34 340 5.7 -9 679.60 -42.0 -41.9 -42.1 69 -99 SPO 1997 04 08 05 35 339 5.8 -9 679.60 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 05 36 338 5.7 -9 679.60 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 05 37 339 6.0 -9 679.60 -42.0 -41.9 -42.1 69 -99 SPO 1997 04 08 05 38 341 5.8 -9 679.60 -42.0 -41.8 -42.1 69 -99 SPO 1997 04 08 05 39 338 5.5 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 40 339 5.6 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 41 342 5.6 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 42 341 5.3 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 43 342 5.4 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 44 343 5.0 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 45 344 5.3 -9 679.60 -42.0 -42.2 -42.1 71 -99 SPO 1997 04 08 05 46 347 5.8 -9 679.60 -42.0 -42.0 -42.1 71 -99 SPO 1997 04 08 05 47 347 5.6 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 48 344 5.4 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 49 341 5.0 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 50 343 5.0 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 51 344 5.2 -9 679.60 -41.9 -42.2 -42.0 70 -99 SPO 1997 04 08 05 52 346 5.2 -9 679.60 -42.0 -42.2 -42.0 72 -99 SPO 1997 04 08 05 53 349 5.3 -9 679.60 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 05 54 349 5.1 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 55 352 5.2 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 56 350 5.3 -9 679.60 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 05 57 345 4.9 -9 679.60 -42.0 -41.9 -42.0 70 -99 SPO 1997 04 08 05 58 341 5.3 -9 679.60 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 05 59 338 5.3 -9 679.60 -41.8 -41.6 -41.8 69 -99 SPO 1997 04 08 06 00 335 6.0 -9 679.60 -41.8 -41.8 -41.8 70 0 SPO 1997 04 08 06 01 333 6.4 -9 679.50 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 08 06 02 333 6.5 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 03 333 6.7 -9 679.50 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 06 04 333 6.8 -9 679.50 -41.8 -41.5 -41.9 70 -99 SPO 1997 04 08 06 05 332 7.0 -9 679.50 -41.8 -41.4 -41.8 71 -99 SPO 1997 04 08 06 06 330 6.7 -9 679.50 -41.7 -41.2 -41.8 70 -99 SPO 1997 04 08 06 07 331 6.8 -9 679.50 -41.7 -41.3 -41.6 71 -99 SPO 1997 04 08 06 08 332 6.6 -9 679.50 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 06 09 335 6.2 -9 679.50 -41.6 -41.0 -41.6 71 -99 SPO 1997 04 08 06 10 337 5.9 -9 679.50 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 06 11 339 5.8 -9 679.50 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 06 12 343 5.5 -9 679.50 -41.6 -41.4 -41.6 72 -99 SPO 1997 04 08 06 13 342 5.6 -9 679.50 -41.6 -41.4 -41.8 72 -99 SPO 1997 04 08 06 14 344 5.6 -9 679.50 -41.7 -41.4 -41.8 72 -99 SPO 1997 04 08 06 15 343 5.8 -9 679.50 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 06 16 344 5.7 -9 679.50 -41.6 -41.3 -41.6 69 -99 SPO 1997 04 08 06 17 346 5.8 -9 679.50 -41.6 -41.4 -41.6 69 -99 SPO 1997 04 08 06 18 346 5.7 -9 679.50 -41.6 -41.6 -41.7 69 -99 SPO 1997 04 08 06 19 346 5.6 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 20 348 5.5 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 21 346 5.7 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 22 347 5.5 -9 679.50 -41.8 -41.8 -41.8 71 -99 SPO 1997 04 08 06 23 346 5.3 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 24 345 5.6 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 25 343 5.6 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 26 343 5.8 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 27 339 5.7 -9 679.50 -41.7 -42.0 -41.8 70 -99 SPO 1997 04 08 06 28 341 5.9 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 29 342 5.9 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 30 345 6.3 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 31 346 6.4 -9 679.50 -41.7 -41.6 -41.8 70 -99 SPO 1997 04 08 06 32 345 6.4 -9 679.50 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 06 33 344 6.2 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 34 344 6.0 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 35 343 6.2 -9 679.50 -41.7 -41.8 -41.7 71 -99 SPO 1997 04 08 06 36 345 6.1 -9 679.50 -41.7 -41.7 -41.7 71 -99 SPO 1997 04 08 06 37 344 6.1 -9 679.50 -41.7 -41.7 -41.7 70 -99 SPO 1997 04 08 06 38 345 5.9 -9 679.50 -41.7 -41.8 -41.7 71 -99 SPO 1997 04 08 06 39 346 5.7 -9 679.50 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 08 06 40 348 5.8 -9 679.50 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 41 346 5.8 -9 679.50 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 42 347 5.8 -9 679.40 -41.6 -41.7 -41.6 70 -99 SPO 1997 04 08 06 43 348 5.9 -9 679.40 -41.6 -41.5 -41.6 70 -99 SPO 1997 04 08 06 44 345 6.0 -9 679.40 -41.6 -41.5 -41.6 69 -99 SPO 1997 04 08 06 45 344 6.3 -9 679.40 -41.6 -41.5 -41.6 69 -99 SPO 1997 04 08 06 46 348 6.3 -9 679.40 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 47 345 6.2 -9 679.30 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 06 48 343 6.6 -9 679.30 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 06 49 344 6.7 -9 679.30 -41.6 -41.8 -41.7 70 -99 SPO 1997 04 08 06 50 346 7.1 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 51 344 6.7 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 52 344 7.1 -9 679.30 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 08 06 53 344 6.5 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 54 346 6.8 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 55 345 6.4 -9 679.20 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 56 344 6.8 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 57 345 6.4 -9 679.30 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 06 58 345 6.7 -9 679.30 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 59 344 6.4 -9 679.30 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 07 00 345 6.2 -9 679.30 -41.6 -41.6 -41.7 70 0 SPO 1997 04 08 07 01 348 6.3 -9 679.30 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 07 02 346 6.7 -9 679.30 -41.6 -41.3 -41.7 70 -99 SPO 1997 04 08 07 03 347 6.6 -9 679.30 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 07 04 347 6.6 -9 679.30 -41.6 -41.0 -41.7 70 -99 SPO 1997 04 08 07 05 346 6.3 -9 679.30 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 07 06 346 6.3 -9 679.30 -41.6 -41.3 -41.6 71 -99 SPO 1997 04 08 07 07 347 6.5 -9 679.30 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 07 08 347 6.5 -9 679.20 -41.6 -41.2 -41.6 70 -99 SPO 1997 04 08 07 09 347 6.4 -9 679.20 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 07 10 348 6.7 -9 679.20 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 07 11 348 6.5 -9 679.20 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 07 12 348 6.7 -9 679.20 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 07 13 350 6.4 -9 679.20 -41.6 -41.5 -41.6 70 -99 SPO 1997 04 08 07 14 349 6.3 -9 679.20 -41.6 -41.6 -41.6 70 -99 SPO 1997 04 08 07 15 348 6.6 -9 679.20 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 07 16 350 6.0 -9 679.20 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 07 17 348 6.6 -9 679.20 -41.6 -41.8 -41.7 70 -99 SPO 1997 04 08 07 18 349 7.0 -9 679.20 -41.7 -41.9 -41.8 71 -99 SPO 1997 04 08 07 19 349 6.6 -9 679.20 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 08 07 20 348 6.7 -9 679.20 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 07 21 346 6.8 -9 679.20 -41.8 -41.9 -41.9 71 -99 SPO 1997 04 08 07 22 347 7.0 -9 679.10 -41.8 -41.8 -41.9 71 -99 SPO 1997 04 08 07 23 347 7.0 -9 679.10 -41.8 -41.7 -41.9 71 -99 SPO 1997 04 08 07 24 345 7.4 -9 679.10 -41.8 -41.4 -41.9 71 -99 SPO 1997 04 08 07 25 343 7.4 -9 679.10 -41.8 -41.1 -41.9 70 -99 SPO 1997 04 08 07 26 342 7.2 -9 679.10 -41.8 -40.9 -41.9 70 -99 SPO 1997 04 08 07 27 341 7.4 -9 679.10 -41.8 -40.5 -41.8 70 -99 SPO 1997 04 08 07 28 342 7.5 -9 679.10 -41.7 -40.4 -41.6 70 -99 SPO 1997 04 08 07 29 344 7.6 -9 679.10 -41.6 -40.5 -41.6 70 -99 SPO 1997 04 08 07 30 338 7.0 -9 679.10 -41.6 -40.7 -41.6 70 -99 SPO 1997 04 08 07 31 335 7.2 -9 679.20 -41.6 -41.0 -41.7 70 -99 SPO 1997 04 08 07 32 342 7.6 -9 679.10 -41.6 -41.0 -41.6 70 -99 SPO 1997 04 08 07 33 344 7.8 -9 679.10 -41.6 -40.8 -41.6 71 -99 SPO 1997 04 08 07 34 348 7.7 -9 679.00 -41.6 -40.2 -41.8 72 -99 SPO 1997 04 08 07 35 348 7.4 -9 679.00 -41.7 -40.1 -41.8 72 -99 SPO 1997 04 08 07 36 350 7.4 -9 679.00 -41.7 -40.2 -41.8 71 -99 SPO 1997 04 08 07 37 348 6.8 -9 679.00 -41.7 -40.3 -41.8 70 -99 SPO 1997 04 08 07 38 344 6.5 -9 679.00 -41.7 -40.9 -41.9 70 -99 SPO 1997 04 08 07 39 348 6.7 -9 679.10 -41.8 -40.8 -41.9 70 -99 SPO 1997 04 08 07 40 347 6.4 -9 679.00 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 07 41 345 6.2 -9 679.10 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 07 42 343 6.2 -9 679.10 -41.9 -40.6 -41.9 70 -99 SPO 1997 04 08 07 43 344 6.3 -9 679.10 -41.8 -40.4 -41.8 70 -99 SPO 1997 04 08 07 44 345 6.1 -9 679.10 -41.8 -40.4 -41.8 70 -99 SPO 1997 04 08 07 45 346 6.4 -9 679.10 -41.7 -40.4 -41.8 70 -99 SPO 1997 04 08 07 46 348 6.3 -9 679.10 -41.7 -40.1 -41.8 70 -99 SPO 1997 04 08 07 47 350 6.4 -9 679.10 -41.8 -39.9 -41.9 71 -99 SPO 1997 04 08 07 48 349 6.7 -9 679.10 -41.8 -39.7 -41.9 71 -99 SPO 1997 04 08 07 49 349 6.4 -9 679.10 -41.8 -39.7 -41.8 71 -99 SPO 1997 04 08 07 50 349 6.4 -9 679.10 -41.8 -39.6 -41.9 71 -99 SPO 1997 04 08 07 51 348 6.3 -9 679.10 -41.8 -39.6 -41.8 71 -99 SPO 1997 04 08 07 52 346 6.1 -9 679.10 -41.8 -40.0 -41.8 70 -99 SPO 1997 04 08 07 53 346 5.7 -9 679.10 -41.8 -40.2 -41.9 69 -99 SPO 1997 04 08 07 54 348 6.1 -9 679.10 -41.8 -40.2 -41.8 70 -99 SPO 1997 04 08 07 55 346 6.2 -9 679.10 -41.8 -40.0 -41.8 70 -99 SPO 1997 04 08 07 56 342 5.6 -9 679.10 -41.8 -40.2 -41.8 70 -99 SPO 1997 04 08 07 57 339 5.9 -9 679.10 -41.8 -40.6 -41.8 70 -99 SPO 1997 04 08 07 58 342 5.9 -9 679.20 -41.8 -41.0 -41.8 70 -99 SPO 1997 04 08 07 59 342 5.5 -9 679.10 -41.8 -41.3 -41.8 70 -99 SPO 1997 04 08 08 00 342 5.7 -9 679.10 -41.7 -41.4 -41.8 70 0 SPO 1997 04 08 08 01 345 5.8 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 02 345 5.9 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 03 346 5.5 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 04 343 5.2 -9 679.20 -41.8 -41.5 -41.9 71 -99 SPO 1997 04 08 08 05 341 5.1 -9 679.20 -41.8 -41.8 -41.9 71 -99 SPO 1997 04 08 08 06 340 4.6 -9 679.20 -41.9 -41.9 -42.0 71 -99 SPO 1997 04 08 08 07 339 4.6 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 08 343 4.5 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 09 343 4.4 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 10 344 4.2 -9 679.30 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 11 343 4.2 -9 679.30 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 12 343 4.2 -9 679.30 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 08 13 343 3.9 -9 679.20 -42.0 -42.1 -42.0 71 -99 SPO 1997 04 08 08 14 341 4.0 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 15 341 4.3 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 16 341 4.3 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 17 337 4.1 -9 679.30 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 08 18 338 4.3 -9 679.30 -42.0 -42.2 -42.0 72 -99 SPO 1997 04 08 08 19 337 4.1 -9 679.30 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 08 20 339 4.0 -9 679.30 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 08 21 339 3.9 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 22 340 3.8 -9 679.30 -42.0 -42.1 -42.1 69 -99 SPO 1997 04 08 08 23 341 3.8 -9 679.30 -42.0 -42.1 -42.0 69 -99 SPO 1997 04 08 08 24 339 4.0 -9 679.30 -42.0 -42.2 -42.0 69 -99 SPO 1997 04 08 08 25 340 3.9 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 26 340 3.9 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 27 339 3.8 -9 679.30 -42.0 -42.1 -42.1 71 -99 SPO 1997 04 08 08 28 339 4.0 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 29 339 4.2 -9 679.30 -42.0 -42.1 -42.1 69 -99 SPO 1997 04 08 08 30 338 4.1 -9 679.30 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 08 31 336 3.9 -9 679.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 32 337 3.8 -9 679.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 33 334 4.0 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 34 333 4.0 -9 679.30 -42.1 -42.1 -42.1 71 -99 SPO 1997 04 08 08 35 333 3.9 -9 679.20 -42.1 -42.0 -42.1 71 -99 SPO 1997 04 08 08 36 332 4.2 -9 679.20 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 37 333 4.0 -9 679.20 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 08 38 331 4.2 -9 679.20 -42.1 -42.1 -42.1 69 -99 SPO 1997 04 08 08 39 332 4.3 -9 679.20 -42.1 -42.1 -42.1 71 -99 SPO 1997 04 08 08 40 331 4.6 -9 679.20 -42.1 -42.2 -42.2 71 -99 SPO 1997 04 08 08 41 331 4.8 -9 679.10 -42.1 -42.1 -42.2 71 -99 SPO 1997 04 08 08 42 332 4.8 -9 679.10 -42.1 -42.0 -42.2 71 -99 SPO 1997 04 08 08 43 330 4.9 -9 679.10 -42.1 -42.1 -42.2 70 -99 SPO 1997 04 08 08 44 330 5.2 -9 679.10 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 08 45 330 5.2 -9 679.10 -42.1 -42.0 -42.2 69 -99 SPO 1997 04 08 08 46 330 5.3 -9 679.10 -42.1 -41.9 -42.2 69 -99 SPO 1997 04 08 08 47 331 5.5 -9 679.00 -42.2 -41.9 -42.2 71 -99 SPO 1997 04 08 08 48 331 5.5 -9 679.00 -42.2 -41.9 -42.2 71 -99 SPO 1997 04 08 08 49 331 5.4 -9 679.00 -42.2 -41.8 -42.2 70 -99 SPO 1997 04 08 08 50 332 5.6 -9 679.00 -42.2 -41.8 -42.3 70 -99 SPO 1997 04 08 08 51 332 5.7 -9 679.00 -42.2 -41.8 -42.3 69 -99 SPO 1997 04 08 08 52 333 5.8 -9 679.00 -42.2 -41.9 -42.3 68 -99 SPO 1997 04 08 08 53 333 5.8 -9 678.90 -42.2 -41.8 -42.3 69 -99 SPO 1997 04 08 08 54 332 5.8 -9 678.90 -42.3 -41.8 -42.3 71 -99 SPO 1997 04 08 08 55 332 5.9 -9 678.90 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 08 56 331 5.9 -9 678.90 -42.3 -41.7 -42.3 71 -99 SPO 1997 04 08 08 57 333 5.9 -9 678.90 -42.2 -41.6 -42.3 69 -99 SPO 1997 04 08 08 58 333 5.8 -9 678.90 -42.2 -41.5 -42.4 69 -99 SPO 1997 04 08 08 59 333 6.0 -9 678.90 -42.2 -41.5 -42.4 68 -99 SPO 1997 04 08 09 00 333 6.0 -9 678.90 -42.3 -41.6 -42.4 69 0 SPO 1997 04 08 09 01 333 6.0 -9 678.90 -42.3 -41.6 -42.4 70 -99 SPO 1997 04 08 09 02 333 6.2 -9 678.90 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 09 03 333 6.3 -9 678.90 -42.3 -41.5 -42.3 70 -99 SPO 1997 04 08 09 04 334 6.2 -9 678.90 -42.3 -41.5 -42.3 69 -99 SPO 1997 04 08 09 05 335 6.3 -9 678.90 -42.3 -41.4 -42.4 69 -99 SPO 1997 04 08 09 06 334 6.4 -9 678.90 -42.3 -41.3 -42.4 69 -99 SPO 1997 04 08 09 07 334 6.4 -9 678.90 -42.3 -41.2 -42.4 69 -99 SPO 1997 04 08 09 08 334 6.5 -9 678.80 -42.3 -41.1 -42.3 71 -99 SPO 1997 04 08 09 09 335 6.5 -9 678.80 -42.3 -41.0 -42.3 71 -99 SPO 1997 04 08 09 10 335 6.4 -9 678.80 -42.3 -40.9 -42.3 70 -99 SPO 1997 04 08 09 11 335 6.4 -9 678.80 -42.2 -40.9 -42.3 69 -99 SPO 1997 04 08 09 12 336 6.3 -9 678.80 -42.2 -40.9 -42.2 70 -99 SPO 1997 04 08 09 13 338 6.1 -9 678.80 -42.2 -40.8 -42.3 70 -99 SPO 1997 04 08 09 14 338 6.2 -9 678.80 -42.2 -40.9 -42.3 70 -99 SPO 1997 04 08 09 15 339 6.2 -9 678.80 -42.2 -41.0 -42.2 71 -99 SPO 1997 04 08 09 16 340 6.3 -9 678.80 -42.2 -41.0 -42.2 71 -99 SPO 1997 04 08 09 17 340 6.2 -9 678.80 -42.1 -41.1 -42.2 69 -99 SPO 1997 04 08 09 18 339 6.3 -9 678.80 -42.1 -41.0 -42.1 69 -99 SPO 1997 04 08 09 19 340 6.3 -9 678.80 -42.1 -41.1 -42.1 69 -99 SPO 1997 04 08 09 20 340 6.0 -9 678.80 -42.0 -41.1 -42.0 69 -99 SPO 1997 04 08 09 21 340 6.2 -9 678.80 -42.0 -41.2 -42.1 69 -99 SPO 1997 04 08 09 22 339 6.2 -9 678.80 -42.0 -41.2 -42.0 69 -99 SPO 1997 04 08 09 23 339 6.2 -9 678.80 -42.0 -41.3 -42.0 70 -99 SPO 1997 04 08 09 24 339 6.2 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 25 339 6.2 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 26 338 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 27 338 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 28 339 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 29 339 6.3 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 30 339 6.1 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 31 339 6.1 -9 678.80 -42.0 -41.4 -42.0 70 -99 SPO 1997 04 08 09 32 339 6.0 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 33 340 5.9 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 34 338 5.7 -9 678.80 -41.9 -41.6 -42.0 70 -99 SPO 1997 04 08 09 35 339 5.7 -9 678.90 -41.9 -41.6 -42.0 70 -99 SPO 1997 04 08 09 36 340 5.5 -9 678.90 -41.9 -41.6 -41.9 71 -99 SPO 1997 04 08 09 37 341 5.6 -9 678.90 -41.9 -41.6 -41.9 70 -99 SPO 1997 04 08 09 38 341 5.5 -9 678.90 -41.9 -41.6 -41.9 70 -99 SPO 1997 04 08 09 39 339 5.4 -9 678.90 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 40 340 5.6 -9 678.90 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 41 339 5.3 -9 678.80 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 42 339 5.3 -9 678.80 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 43 339 5.5 -9 678.80 -41.8 -41.7 -41.9 70 -99 SPO 1997 04 08 09 44 339 5.5 -9 678.80 -41.8 -41.6 -41.9 70 -99 SPO 1997 04 08 09 45 340 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 46 340 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 47 339 5.4 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 48 338 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 49 337 5.5 -9 678.90 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 09 50 336 5.5 -9 678.90 -41.7 -41.5 -41.7 70 -99 SPO 1997 04 08 09 51 336 5.6 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 52 336 5.6 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 53 336 5.7 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 54 336 5.6 -9 678.80 -41.6 -41.3 -41.7 70 -99 SPO 1997 04 08 09 55 337 5.5 -9 678.80 -41.6 -41.3 -41.7 71 -99 SPO 1997 04 08 09 56 335 5.5 -9 678.80 -41.6 -41.3 -41.6 72 -99 SPO 1997 04 08 09 57 336 5.4 -9 678.80 -41.6 -41.4 -41.7 72 -99 SPO 1997 04 08 09 58 336 5.4 -9 678.80 -41.6 -41.4 -41.7 71 -99 SPO 1997 04 08 09 59 343 5.5 -9 678.80 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 10 00 342 5.6 -9 678.80 -41.6 -41.3 -41.7 69 0 SPO 1997 04 08 10 01 343 5.5 -9 678.80 -41.6 -41.3 -41.7 69 -99 SPO 1997 04 08 10 02 346 5.6 -9 678.80 -41.6 -41.2 -41.7 69 -99 SPO 1997 04 08 10 03 343 5.3 -9 678.70 -41.7 -41.2 -41.7 70 -99 SPO 1997 04 08 10 04 339 5.0 -9 678.70 -41.7 -41.3 -41.7 71 -99 SPO 1997 04 08 10 05 339 5.0 -9 678.70 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 10 06 341 5.2 -9 678.70 -41.6 -41.4 -41.6 70 -99 SPO 1997 04 08 10 07 345 5.3 -9 678.70 -41.6 -41.4 -41.6 70 -99 SPO 1997 04 08 10 08 345 5.2 -9 678.70 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 09 342 4.9 -9 678.70 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 10 342 4.7 -9 678.70 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 11 341 4.8 -9 678.70 -41.5 -41.4 -41.6 71 -99 SPO 1997 04 08 10 12 340 4.8 -9 678.70 -41.5 -41.6 -41.5 71 -99 SPO 1997 04 08 10 13 342 4.8 -9 678.70 -41.5 -41.6 -41.6 70 -99 SPO 1997 04 08 10 14 343 5.1 -9 678.60 -41.5 -41.6 -41.6 70 -99 SPO 1997 04 08 10 15 343 5.3 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 16 342 5.2 -9 678.60 -41.5 -41.5 -41.5 70 -99 SPO 1997 04 08 10 17 342 5.2 -9 678.60 -41.5 -41.5 -41.5 70 -99 SPO 1997 04 08 10 18 343 5.2 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 19 342 5.4 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 20 344 5.3 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 21 343 5.3 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 22 337 5.1 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 23 336 5.2 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 24 339 5.1 -9 678.60 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 25 341 5.2 -9 678.60 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 26 342 5.2 -9 678.60 -41.5 -41.4 -41.5 71 -99 SPO 1997 04 08 10 27 341 5.2 -9 678.60 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 28 341 5.3 -9 678.60 -41.4 -41.5 -41.5 69 -99 SPO 1997 04 08 10 29 343 5.1 -9 678.60 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 30 342 5.3 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 31 343 5.7 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 32 343 5.6 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 33 341 5.3 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 34 338 5.4 -9 678.50 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 35 338 5.5 -9 678.50 -41.4 -41.4 -41.5 70 -99 SPO 1997 04 08 10 36 338 5.5 -9 678.50 -41.4 -41.4 -41.5 71 -99 SPO 1997 04 08 10 37 339 5.4 -9 678.50 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 38 342 5.7 -9 678.40 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 39 337 5.3 -9 678.40 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 40 340 5.5 -9 678.40 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 41 341 5.7 -9 678.40 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 10 42 341 5.6 -9 678.40 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 10 43 341 5.9 -9 678.40 -41.6 -41.5 -41.7 69 -99 SPO 1997 04 08 10 44 338 5.7 -9 678.40 -41.6 -41.5 -41.7 69 -99 SPO 1997 04 08 10 45 336 5.8 -9 678.40 -41.6 -41.7 -41.8 70 -99 SPO 1997 04 08 10 46 340 5.8 -9 678.40 -41.7 -41.4 -41.8 70 -99 SPO 1997 04 08 10 47 338 6.0 -9 678.40 -41.7 -41.2 -41.8 71 -99 SPO 1997 04 08 10 48 335 6.0 -9 678.40 -41.7 -41.4 -41.8 70 -99 SPO 1997 04 08 10 49 337 6.0 -9 678.40 -41.8 -41.5 -41.8 70 -99 SPO 1997 04 08 10 50 337 5.9 -9 678.40 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 10 51 339 6.0 -9 678.40 -41.8 -41.6 -41.8 71 -99 SPO 1997 04 08 10 52 340 6.2 -9 678.40 -41.8 -41.6 -41.8 71 -99 SPO 1997 04 08 10 53 341 6.0 -9 678.30 -41.8 -41.6 -41.9 71 -99 SPO 1997 04 08 10 54 342 6.0 -9 678.30 -41.8 -41.7 -41.9 70 -99 SPO 1997 04 08 10 55 341 5.9 -9 678.30 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 10 56 342 5.8 -9 678.30 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 10 57 342 5.5 -9 678.30 -41.9 -41.9 -41.9 70 -99 SPO 1997 04 08 10 58 343 5.8 -9 678.40 -41.9 -41.9 -42.0 70 -99 SPO 1997 04 08 10 59 344 5.8 -9 678.40 -41.9 -41.9 -42.0 70 -99 SPO 1997 04 08 11 00 342 5.7 -9 678.40 -42.0 -41.9 -42.0 70 0 SPO 1997 04 08 11 01 342 5.4 -9 678.40 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 11 02 342 5.3 -9 678.40 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 11 03 342 5.4 -9 678.40 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 04 342 5.5 -9 678.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 05 342 5.7 -9 678.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 06 341 5.6 -9 678.30 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 11 07 340 5.7 -9 678.30 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 11 08 341 5.6 -9 678.30 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 11 09 341 5.8 -9 678.30 -42.1 -42.0 -42.2 69 -99 SPO 1997 04 08 11 10 339 5.9 -9 678.30 -42.2 -41.8 -42.2 69 -99 SPO 1997 04 08 11 11 338 6.1 -9 678.30 -42.1 -41.6 -42.2 69 -99 SPO 1997 04 08 11 12 338 6.2 -9 678.20 -42.0 -41.4 -42.2 68 -99 SPO 1997 04 08 11 13 337 6.4 -9 678.20 -42.1 -41.4 -42.1 69 -99 SPO 1997 04 08 11 14 337 6.4 -9 678.20 -42.1 -41.4 -42.1 69 -99 SPO 1997 04 08 11 15 337 6.4 -9 678.20 -42.1 -41.4 -42.1 71 -99 SPO 1997 04 08 11 16 337 6.4 -9 678.20 -42.1 -41.4 -42.1 71 -99 SPO 1997 04 08 11 17 338 6.6 -9 678.20 -42.1 -41.5 -42.1 71 -99 SPO 1997 04 08 11 18 339 6.3 -9 678.20 -42.1 -41.5 -42.2 71 -99 SPO 1997 04 08 11 19 340 6.3 -9 678.20 -42.1 -41.5 -42.2 69 -99 SPO 1997 04 08 11 20 339 6.3 -9 678.20 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 11 21 339 6.3 -9 678.20 -42.2 -41.6 -42.4 69 -99 SPO 1997 04 08 11 22 339 6.5 -9 678.20 -42.3 -41.6 -42.4 71 -99 SPO 1997 04 08 11 23 339 6.5 -9 678.20 -42.3 -41.5 -42.4 69 -99 SPO 1997 04 08 11 24 339 6.5 -9 678.20 -42.3 -41.4 -42.4 68 -99 SPO 1997 04 08 11 25 339 6.7 -9 678.20 -42.3 -41.2 -42.4 68 -99 SPO 1997 04 08 11 26 340 6.6 -9 678.20 -42.4 -41.2 -42.4 69 -99 SPO 1997 04 08 11 27 339 6.5 -9 678.20 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 11 28 339 6.4 -9 678.20 -42.4 -41.1 -42.5 69 -99 SPO 1997 04 08 11 29 340 6.2 -9 678.20 -42.4 -41.2 -42.5 69 -99 SPO 1997 04 08 11 30 339 6.2 -9 678.20 -42.5 -41.2 -42.5 70 -99 SPO 1997 04 08 11 31 339 6.1 -9 678.20 -42.4 -41.2 -42.6 69 -99 SPO 1997 04 08 11 32 340 6.1 -9 678.20 -42.4 -41.1 -42.6 69 -99 SPO 1997 04 08 11 33 340 6.0 -9 678.20 -42.5 -41.1 -42.6 69 -99 SPO 1997 04 08 11 34 342 5.8 -9 678.20 -42.5 -41.2 -42.6 68 -99 SPO 1997 04 08 11 35 342 5.7 -9 678.20 -42.5 -41.4 -42.6 68 -99 SPO 1997 04 08 11 36 343 5.6 -9 678.20 -42.6 -41.6 -42.6 69 -99 SPO 1997 04 08 11 37 343 5.5 -9 678.20 -42.6 -41.7 -42.7 69 -99 SPO 1997 04 08 11 38 342 5.3 -9 678.30 -42.6 -41.7 -42.7 68 -99 SPO 1997 04 08 11 39 343 5.2 -9 678.30 -42.6 -41.8 -42.7 67 -99 SPO 1997 04 08 11 40 343 4.9 -9 678.30 -42.6 -41.8 -42.7 67 -99 SPO 1997 04 08 11 41 344 4.7 -9 678.30 -42.6 -41.9 -42.7 68 -99 SPO 1997 04 08 11 42 344 4.5 -9 678.40 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 11 43 345 4.3 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 44 347 4.2 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 45 348 4.1 -9 678.40 -42.6 -42.4 -42.7 69 -99 SPO 1997 04 08 11 46 349 4.1 -9 678.40 -42.7 -42.4 -42.7 69 -99 SPO 1997 04 08 11 47 349 3.9 -9 678.40 -42.7 -42.5 -42.7 69 -99 SPO 1997 04 08 11 48 347 3.8 -9 678.40 -42.7 -42.6 -42.7 69 -99 SPO 1997 04 08 11 49 349 3.9 -9 678.40 -42.7 -42.5 -42.7 70 -99 SPO 1997 04 08 11 50 349 4.2 -9 678.40 -42.7 -42.5 -42.8 70 -99 SPO 1997 04 08 11 51 349 4.4 -9 678.40 -42.7 -42.4 -42.7 69 -99 SPO 1997 04 08 11 52 348 4.2 -9 678.40 -42.6 -42.3 -42.7 68 -99 SPO 1997 04 08 11 53 346 4.4 -9 678.40 -42.6 -42.2 -42.7 67 -99 SPO 1997 04 08 11 54 346 4.4 -9 678.40 -42.6 -42.2 -42.7 67 -99 SPO 1997 04 08 11 55 346 4.5 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 56 345 4.5 -9 678.40 -42.6 -42.1 -42.7 68 -99 SPO 1997 04 08 11 57 347 4.6 -9 678.40 -42.6 -42.1 -42.7 68 -99 SPO 1997 04 08 11 58 347 4.6 -9 678.40 -42.7 -42.2 -42.7 69 -99 SPO 1997 04 08 11 59 348 4.5 -9 678.40 -42.6 -42.3 -42.7 68 -99 SPO 1997 04 08 12 00 349 4.3 -9 678.40 -42.7 -42.4 -42.7 69 0 SPO 1997 04 08 12 01 349 4.2 -9 678.40 -42.7 -42.4 -42.8 69 -99 SPO 1997 04 08 12 02 349 4.2 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 03 348 4.1 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 04 348 4.2 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 05 347 4.1 -9 678.40 -42.8 -42.4 -42.8 69 -99 SPO 1997 04 08 12 06 347 4.1 -9 678.40 -42.8 -42.4 -42.8 69 -99 SPO 1997 04 08 12 07 349 4.1 -9 678.30 -42.7 -42.4 -42.8 68 -99 SPO 1997 04 08 12 08 350 4.0 -9 678.40 -42.7 -42.4 -42.7 68 -99 SPO 1997 04 08 12 09 352 3.9 -9 678.30 -42.7 -42.4 -42.8 68 -99 SPO 1997 04 08 12 10 353 3.7 -9 678.40 -42.7 -42.4 -42.8 69 -99 SPO 1997 04 08 12 11 355 3.4 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 12 357 3.4 -9 678.40 -42.8 -42.5 -42.8 69 -99 SPO 1997 04 08 12 13 355 3.5 -9 678.30 -42.8 -42.6 -42.9 69 -99 SPO 1997 04 08 12 14 357 3.6 -9 678.30 -42.7 -42.7 -42.9 69 -99 SPO 1997 04 08 12 15 357 3.6 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 16 356 3.4 -9 678.30 -42.8 -42.8 -42.9 68 -99 SPO 1997 04 08 12 17 359 3.4 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 18 0 3.2 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 19 1 3.3 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 20 2 3.3 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 21 359 3.5 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 22 358 3.7 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 23 357 3.7 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 24 356 3.7 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 25 354 3.9 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 26 352 3.9 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 27 350 4.0 -9 678.30 -42.9 -42.6 -42.9 69 -99 SPO 1997 04 08 12 28 348 3.9 -9 678.30 -42.9 -42.6 -42.9 69 -99 SPO 1997 04 08 12 29 347 3.9 -9 678.30 -42.9 -42.5 -42.9 69 -99 SPO 1997 04 08 12 30 346 3.7 -9 678.20 -42.9 -42.6 -42.9 70 -99 SPO 1997 04 08 12 31 348 4.1 -9 678.20 -42.9 -42.5 -43.0 69 -99 SPO 1997 04 08 12 32 350 4.1 -9 678.20 -42.9 -42.5 -42.9 69 -99 SPO 1997 04 08 12 33 352 4.0 -9 678.20 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 12 34 354 3.8 -9 678.20 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 12 35 357 3.6 -9 678.20 -42.8 -42.7 -43.0 68 -99 SPO 1997 04 08 12 36 358 3.6 -9 678.20 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 12 37 0 3.4 -9 678.20 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 12 38 5 3.5 -9 678.20 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 12 39 8 3.3 -9 678.20 -43.0 -42.7 -43.0 69 -99 SPO 1997 04 08 12 40 10 3.1 -9 678.20 -43.0 -42.7 -43.1 68 -99 SPO 1997 04 08 12 41 12 3.0 -9 678.20 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 12 42 16 3.0 -9 678.20 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 12 43 18 3.0 -9 678.20 -43.0 -43.0 -43.1 69 -99 SPO 1997 04 08 12 44 18 2.9 -9 678.20 -43.1 -43.1 -43.1 69 -99 SPO 1997 04 08 12 45 17 2.9 -9 678.20 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 46 15 2.6 -9 678.20 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 12 47 12 2.7 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 48 9 2.8 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 49 7 3.1 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 50 5 3.5 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 51 3 3.5 -9 678.10 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 52 2 3.8 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 53 0 3.9 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 54 359 4.0 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 55 359 4.2 -9 678.10 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 56 359 4.1 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 12 57 359 4.3 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 58 1 4.2 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 59 360 4.1 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 00 359 3.9 -9 678.10 -43.1 -43.1 -43.2 69 0 SPO 1997 04 08 13 01 358 3.7 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 02 358 3.5 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 03 359 3.5 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 04 358 3.7 -9 678.10 -43.1 -43.2 -43.2 66 -99 SPO 1997 04 08 13 05 357 3.6 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 06 357 3.9 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 07 357 3.9 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 08 356 3.8 -9 678.10 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 13 09 353 3.9 -9 678.10 -43.2 -43.2 -43.3 68 -99 SPO 1997 04 08 13 10 353 4.0 -9 678.00 -43.2 -43.1 -43.3 68 -99 SPO 1997 04 08 13 11 354 4.1 -9 678.00 -43.2 -43.1 -43.3 69 -99 SPO 1997 04 08 13 12 354 4.3 -9 678.00 -43.2 -43.1 -43.3 69 -99 SPO 1997 04 08 13 13 354 4.4 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 14 354 4.5 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 15 354 4.6 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 16 354 4.5 -9 678.00 -43.3 -43.0 -43.3 69 -99 SPO 1997 04 08 13 17 355 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 18 355 4.3 -9 678.00 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 19 354 4.3 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 20 355 4.4 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 21 356 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 22 358 4.3 -9 678.00 -43.2 -42.9 -43.3 68 -99 SPO 1997 04 08 13 23 357 4.1 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 24 358 4.3 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 25 0 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 26 1 4.0 -9 678.00 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 13 27 2 4.0 -9 678.00 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 13 28 4 4.0 -9 678.00 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 29 6 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 30 6 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 31 7 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 32 7 3.7 -9 678.00 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 13 33 6 3.5 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 34 7 3.5 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 35 7 3.6 -9 677.90 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 36 7 3.5 -9 677.90 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 37 6 3.5 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 38 7 3.5 -9 677.90 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 39 6 3.5 -9 677.90 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 40 6 3.7 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 41 4 3.6 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 42 5 3.7 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 43 6 3.8 -9 677.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 44 5 3.8 -9 677.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 45 6 4.0 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 46 6 4.1 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 47 5 4.2 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 48 5 4.3 -9 677.80 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 49 4 4.4 -9 677.80 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 13 50 3 4.6 -9 677.80 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 51 2 4.6 -9 677.80 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 13 52 2 4.6 -9 677.80 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 13 53 360 4.6 -9 677.80 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 13 54 358 4.7 -9 677.80 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 13 55 357 4.8 -9 677.80 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 13 56 356 4.7 -9 677.80 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 13 57 356 5.0 -9 677.80 -43.1 -42.6 -43.1 69 -99 SPO 1997 04 08 13 58 355 4.8 -9 677.80 -43.1 -42.6 -43.1 69 -99 SPO 1997 04 08 13 59 354 4.7 -9 677.80 -43.1 -42.5 -43.1 69 -99 SPO 1997 04 08 14 00 354 4.6 -9 677.80 -43.1 -42.4 -43.1 69 0 SPO 1997 04 08 14 01 354 4.4 -9 677.80 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 02 354 4.6 -9 677.80 -43.0 -42.5 -43.1 68 -99 SPO 1997 04 08 14 03 355 4.5 -9 677.80 -42.9 -42.5 -43.1 68 -99 SPO 1997 04 08 14 04 357 4.7 -9 677.80 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 05 356 4.7 -9 677.70 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 06 356 4.7 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 07 356 4.6 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 08 356 4.7 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 09 356 4.6 -9 677.70 -43.0 -42.5 -43.0 69 -99 SPO 1997 04 08 14 10 356 4.6 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 11 355 4.7 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 12 356 4.7 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 13 356 4.6 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 14 356 4.8 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 15 356 4.8 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 16 355 4.8 -9 677.70 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 14 17 354 4.7 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 18 355 4.6 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 19 355 4.7 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 20 355 4.8 -9 677.70 -42.9 -42.7 -42.9 69 -99 SPO 1997 04 08 14 21 353 4.7 -9 677.80 -42.9 -42.7 -42.9 69 -99 SPO 1997 04 08 14 22 353 4.7 -9 677.80 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 23 353 4.5 -9 677.80 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 24 353 4.4 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 25 353 4.6 -9 677.70 -42.7 -42.6 -42.9 68 -99 SPO 1997 04 08 14 26 354 4.7 -9 677.70 -42.7 -42.6 -42.9 68 -99 SPO 1997 04 08 14 27 353 4.5 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 28 352 4.7 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 29 353 4.6 -9 677.70 -42.8 -42.7 -42.9 68 -99 SPO 1997 04 08 14 30 354 4.4 -9 677.70 -42.8 -42.7 -42.9 68 -99 SPO 1997 04 08 14 31 357 4.5 -9 677.70 -42.8 -42.8 -42.9 68 -99 SPO 1997 04 08 14 32 359 4.6 -9 677.70 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 14 33 358 4.4 -9 677.80 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 14 34 359 4.3 -9 677.80 -42.8 -42.9 -42.9 69 -99 SPO 1997 04 08 14 35 1 4.7 -9 677.80 -42.8 -42.9 -43.0 69 -99 SPO 1997 04 08 14 36 0 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 37 1 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 38 1 4.6 -9 677.80 -42.8 -42.9 -42.9 69 -99 SPO 1997 04 08 14 39 0 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 40 359 4.5 -9 677.80 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 14 41 359 4.6 -9 677.70 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 14 42 358 4.5 -9 677.70 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 43 356 4.6 -9 677.80 -42.9 -42.8 -43.0 68 -99 SPO 1997 04 08 14 44 356 4.7 -9 677.80 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 45 355 4.5 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 46 354 4.7 -9 677.70 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 47 355 4.7 -9 677.70 -42.8 -42.8 -43.0 68 -99 SPO 1997 04 08 14 48 353 4.7 -9 677.70 -42.8 -42.8 -43.0 68 -99 SPO 1997 04 08 14 49 353 4.8 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 50 353 5.0 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 51 352 5.0 -9 677.70 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 14 52 353 5.1 -9 677.60 -42.9 -42.7 -43.0 68 -99 SPO 1997 04 08 14 53 352 5.2 -9 677.70 -42.9 -42.7 -43.0 68 -99 SPO 1997 04 08 14 54 352 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 55 354 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 56 355 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 57 356 5.1 -9 677.60 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 14 58 358 5.2 -9 677.60 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 14 59 359 5.3 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 00 360 5.0 -9 677.60 -43.0 -42.9 -43.1 69 0 SPO 1997 04 08 15 01 0 5.2 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 02 1 5.2 -9 677.60 -43.0 -43.0 -43.1 69 -99 SPO 1997 04 08 15 03 360 5.3 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 04 360 5.5 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 05 359 5.6 -9 677.60 -43.1 -42.9 -43.1 69 -99 SPO 1997 04 08 15 06 358 5.6 -9 677.60 -43.1 -42.8 -43.1 69 -99 SPO 1997 04 08 15 07 359 5.7 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 08 358 5.6 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 09 357 5.5 -9 677.60 -42.9 -42.7 -43.1 68 -99 SPO 1997 04 08 15 10 356 5.6 -9 677.60 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 15 11 355 5.5 -9 677.60 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 12 356 5.5 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 13 356 5.5 -9 677.60 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 15 14 356 5.5 -9 677.60 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 15 15 354 5.7 -9 677.60 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 15 16 354 5.7 -9 677.60 -43.0 -42.6 -43.1 70 -99 SPO 1997 04 08 15 17 354 5.6 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 18 354 6.0 -9 677.60 -43.0 -42.3 -43.1 69 -99 SPO 1997 04 08 15 19 353 6.0 -9 677.60 -43.0 -42.1 -43.0 69 -99 SPO 1997 04 08 15 20 351 5.9 -9 677.60 -43.0 -42.2 -43.0 69 -99 SPO 1997 04 08 15 21 350 6.0 -9 677.60 -42.9 -42.1 -43.0 69 -99 SPO 1997 04 08 15 22 349 6.0 -9 677.60 -42.9 -41.8 -43.0 68 -99 SPO 1997 04 08 15 23 347 5.8 -9 677.60 -42.9 -41.9 -42.8 69 -99 SPO 1997 04 08 15 24 347 5.7 -9 677.60 -42.8 -42.0 -42.8 69 -99 SPO 1997 04 08 15 25 347 5.6 -9 677.60 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 26 348 5.3 -9 677.50 -42.8 -42.1 -42.9 69 -99 SPO 1997 04 08 15 27 346 4.9 -9 677.60 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 28 347 4.9 -9 677.60 -42.9 -42.0 -42.9 69 -99 SPO 1997 04 08 15 29 347 4.8 -9 677.60 -42.9 -42.2 -42.9 69 -99 SPO 1997 04 08 15 30 345 4.4 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 31 347 4.5 -9 677.60 -42.8 -42.3 -42.9 69 -99 SPO 1997 04 08 15 32 347 4.2 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 33 345 4.1 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 34 341 4.0 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 35 342 4.1 -9 677.60 -42.9 -42.4 -43.0 69 -99 SPO 1997 04 08 15 36 340 4.4 -9 677.60 -42.8 -42.2 -42.9 68 -99 SPO 1997 04 08 15 37 340 4.3 -9 677.60 -42.9 -42.3 -42.9 69 -99 SPO 1997 04 08 15 38 341 4.8 -9 677.50 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 39 342 5.1 -9 677.50 -42.8 -41.9 -42.8 69 -99 SPO 1997 04 08 15 40 341 5.1 -9 677.50 -42.8 -41.9 -42.9 69 -99 SPO 1997 04 08 15 41 343 5.2 -9 677.50 -42.8 -41.8 -42.8 69 -99 SPO 1997 04 08 15 42 345 5.2 -9 677.50 -42.8 -41.8 -42.9 69 -99 SPO 1997 04 08 15 43 346 5.0 -9 677.50 -42.8 -42.1 -42.9 69 -99 SPO 1997 04 08 15 44 346 4.8 -9 677.50 -42.9 -42.3 -43.0 69 -99 SPO 1997 04 08 15 45 346 5.0 -9 677.50 -43.0 -42.4 -43.1 70 -99 SPO 1997 04 08 15 46 347 5.0 -9 677.50 -43.0 -42.4 -43.0 71 -99 SPO 1997 04 08 15 47 347 4.8 -9 677.50 -43.0 -42.4 -43.0 69 -99 SPO 1997 04 08 15 48 346 4.6 -9 677.50 -43.0 -42.4 -43.0 69 -99 SPO 1997 04 08 15 49 349 4.6 -9 677.50 -43.0 -42.7 -43.0 69 -99 SPO 1997 04 08 15 50 348 4.2 -9 677.50 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 15 51 348 4.4 -9 677.50 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 52 347 4.4 -9 677.50 -42.9 -42.9 -43.1 67 -99 SPO 1997 04 08 15 53 349 4.5 -9 677.50 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 15 54 351 4.3 -9 677.40 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 55 353 4.5 -9 677.50 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 56 354 4.7 -9 677.50 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 15 57 351 4.8 -9 677.40 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 58 349 4.7 -9 677.50 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 15 59 348 4.8 -9 677.50 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 16 00 345 4.6 -9 677.40 -43.1 -42.8 -43.2 68 0 SPO 1997 04 08 16 01 344 4.8 -9 677.40 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 16 02 344 4.9 -9 677.40 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 16 03 343 4.9 -9 677.40 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 16 04 342 5.0 -9 677.40 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 16 05 341 5.2 -9 677.40 -43.1 -42.5 -43.1 68 -99 SPO 1997 04 08 16 06 342 5.1 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 07 343 5.2 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 08 343 5.2 -9 677.40 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 16 09 342 5.1 -9 677.40 -43.1 -42.4 -43.2 69 -99 SPO 1997 04 08 16 10 342 5.4 -9 677.40 -43.1 -42.5 -43.1 68 -99 SPO 1997 04 08 16 11 344 5.2 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 12 344 5.2 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 13 343 5.3 -9 677.40 -43.0 -42.5 -43.2 68 -99 SPO 1997 04 08 16 14 343 5.1 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 15 343 5.0 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 16 343 5.0 -9 677.40 -43.1 -42.5 -43.2 69 -99 SPO 1997 04 08 16 17 343 5.0 -9 677.40 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 16 18 343 5.0 -9 677.40 -43.2 -42.6 -43.2 68 -99 SPO 1997 04 08 16 19 343 5.0 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 20 342 5.1 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 21 342 5.3 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 22 342 5.2 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 23 342 5.1 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 24 342 5.0 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 25 342 5.0 -9 677.40 -43.2 -42.7 -43.3 68 -99 SPO 1997 04 08 16 26 342 4.9 -9 677.40 -43.2 -42.8 -43.3 68 -99 SPO 1997 04 08 16 27 342 4.7 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 28 340 4.6 -9 677.40 -43.3 -42.8 -43.3 69 -99 SPO 1997 04 08 16 29 340 4.7 -9 677.40 -43.3 -43.0 -43.3 69 -99 SPO 1997 04 08 16 30 341 4.8 -9 677.40 -43.3 -43.0 -43.4 70 -99 SPO 1997 04 08 16 31 343 4.7 -9 677.40 -43.3 -42.8 -43.4 69 -99 SPO 1997 04 08 16 32 342 4.6 -9 677.40 -43.4 -42.8 -43.4 69 -99 SPO 1997 04 08 16 33 341 4.7 -9 677.40 -43.3 -42.9 -43.4 68 -99 SPO 1997 04 08 16 34 342 4.8 -9 677.40 -43.3 -42.8 -43.4 68 -99 SPO 1997 04 08 16 35 342 4.9 -9 677.40 -43.3 -42.7 -43.4 68 -99 SPO 1997 04 08 16 36 342 4.9 -9 677.40 -43.3 -42.6 -43.4 68 -99 SPO 1997 04 08 16 37 342 4.8 -9 677.40 -43.4 -42.6 -43.4 70 -99 SPO 1997 04 08 16 38 342 5.0 -9 677.40 -43.4 -42.7 -43.4 69 -99 SPO 1997 04 08 16 39 342 4.8 -9 677.40 -43.4 -42.7 -43.4 69 -99 SPO 1997 04 08 16 40 342 4.8 -9 677.40 -43.4 -42.7 -43.4 68 -99 SPO 1997 04 08 16 41 343 4.9 -9 677.40 -43.3 -42.8 -43.4 68 -99 SPO 1997 04 08 16 42 343 4.8 -9 677.40 -43.4 -42.8 -43.4 69 -99 SPO 1997 04 08 16 43 344 4.7 -9 677.40 -43.4 -42.9 -43.4 70 -99 SPO 1997 04 08 16 44 344 4.7 -9 677.40 -43.4 -43.0 -43.4 69 -99 SPO 1997 04 08 16 45 344 4.7 -9 677.40 -43.4 -43.1 -43.5 69 -99 SPO 1997 04 08 16 46 343 4.7 -9 677.40 -43.4 -43.0 -43.5 68 -99 SPO 1997 04 08 16 47 345 4.8 -9 677.40 -43.4 -43.0 -43.6 68 -99 SPO 1997 04 08 16 48 344 4.8 -9 677.40 -43.4 -43.0 -43.5 67 -99 SPO 1997 04 08 16 49 343 4.8 -9 677.40 -43.4 -43.0 -43.5 68 -99 SPO 1997 04 08 16 50 343 4.8 -9 677.40 -43.5 -42.9 -43.5 68 -99 SPO 1997 04 08 16 51 343 4.9 -9 677.40 -43.5 -42.8 -43.5 68 -99 SPO 1997 04 08 16 52 342 5.0 -9 677.40 -43.5 -42.7 -43.5 69 -99 SPO 1997 04 08 16 53 343 5.1 -9 677.30 -43.4 -42.6 -43.5 69 -99 SPO 1997 04 08 16 54 343 5.1 -9 677.30 -43.5 -42.6 -43.5 70 -99 SPO 1997 04 08 16 55 344 5.2 -9 677.30 -43.4 -42.6 -43.4 69 -99 SPO 1997 04 08 16 56 345 5.2 -9 677.30 -43.3 -42.6 -43.4 68 -99 SPO 1997 04 08 16 57 347 5.0 -9 677.30 -43.4 -42.6 -43.4 69 -99 SPO 1997 04 08 16 58 349 5.0 -9 677.30 -43.4 -42.6 -43.5 68 -99 SPO 1997 04 08 16 59 350 4.7 -9 677.30 -43.4 -42.6 -43.5 68 -99 SPO 1997 04 08 17 00 350 4.6 -9 677.30 -43.4 -42.8 -43.5 68 0 SPO 1997 04 08 17 01 352 4.8 -9 677.30 -43.4 -42.9 -43.5 68 -99 SPO 1997 04 08 17 02 353 4.8 -9 677.30 -43.4 -42.9 -43.5 68 -99 SPO 1997 04 08 17 03 352 4.8 -9 677.30 -43.4 -42.9 -43.5 67 -99 SPO 1997 04 08 17 04 352 5.1 -9 677.30 -43.4 -42.8 -43.5 68 -99 SPO 1997 04 08 17 05 351 5.0 -9 677.30 -43.4 -42.8 -43.5 69 -99 SPO 1997 04 08 17 06 350 5.1 -9 677.30 -43.4 -42.8 -43.5 69 -99 SPO 1997 04 08 17 07 348 4.9 -9 677.30 -43.4 -42.7 -43.4 68 -99 SPO 1997 04 08 17 08 347 5.2 -9 677.30 -43.4 -42.6 -43.4 68 -99 SPO 1997 04 08 17 09 347 5.3 -9 677.30 -43.4 -42.5 -43.4 69 -99 SPO 1997 04 08 17 10 346 5.4 -9 677.30 -43.3 -42.5 -43.3 68 -99 SPO 1997 04 08 17 11 345 5.4 -9 677.20 -43.3 -42.3 -43.3 68 -99 SPO 1997 04 08 17 12 345 5.5 -9 677.20 -43.3 -42.3 -43.3 70 -99 SPO 1997 04 08 17 13 345 5.5 -9 677.30 -43.2 -42.2 -43.3 69 -99 SPO 1997 04 08 17 14 346 5.5 -9 677.30 -43.2 -42.2 -43.3 68 -99 SPO 1997 04 08 17 15 346 5.4 -9 677.20 -43.2 -42.3 -43.2 68 -99 SPO 1997 04 08 17 16 347 5.3 -9 677.30 -43.2 -42.4 -43.2 68 -99 SPO 1997 04 08 17 17 348 5.4 -9 677.20 -43.2 -42.4 -43.2 68 -99 SPO 1997 04 08 17 18 348 5.4 -9 677.20 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 17 19 349 5.5 -9 677.20 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 17 20 349 5.8 -9 677.20 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 17 21 349 5.7 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 22 349 5.9 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 23 349 5.9 -9 677.20 -43.2 -42.5 -43.2 68 -99 SPO 1997 04 08 17 24 348 6.0 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 25 348 5.9 -9 677.20 -43.1 -42.4 -43.2 68 -99 SPO 1997 04 08 17 26 347 5.9 -9 677.20 -43.1 -42.4 -43.2 69 -99 SPO 1997 04 08 17 27 347 5.9 -9 677.20 -43.1 -42.4 -43.2 68 -99 SPO 1997 04 08 17 28 347 5.9 -9 677.20 -43.1 -42.4 -43.1 68 -99 SPO 1997 04 08 17 29 348 5.8 -9 677.20 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 17 30 347 5.6 -9 677.20 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 17 31 348 5.6 -9 677.20 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 17 32 348 5.4 -9 677.20 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 17 33 348 5.6 -9 677.20 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 34 349 5.5 -9 677.20 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 35 349 5.4 -9 677.10 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 36 350 5.6 -9 677.10 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 37 350 5.6 -9 677.10 -43.1 -42.7 -43.2 69 -99 SPO 1997 04 08 17 38 352 5.7 -9 677.10 -43.1 -42.7 -43.2 69 -99 SPO 1997 04 08 17 39 353 5.5 -9 677.10 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 17 40 354 5.4 -9 677.10 -43.0 -42.8 -43.2 69 -99 SPO 1997 04 08 17 41 355 5.3 -9 677.10 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 17 42 356 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 43 355 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 44 356 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 45 354 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 46 353 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 47 352 5.4 -9 677.10 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 17 48 351 5.3 -9 677.10 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 17 49 350 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 50 351 5.0 -9 677.10 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 17 51 352 5.1 -9 677.10 -43.1 -42.9 -43.2 69 -99 SPO 1997 04 08 17 52 352 5.4 -9 677.00 -43.1 -43.0 -43.2 69 -99 SPO 1997 04 08 17 53 352 5.5 -9 677.00 -43.1 -43.0 -43.2 69 -99 SPO 1997 04 08 17 54 352 5.5 -9 677.00 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 17 55 351 5.6 -9 677.00 -43.2 -43.0 -43.2 69 -99 SPO 1997 04 08 17 56 351 5.6 -9 677.00 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 17 57 351 5.6 -9 677.00 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 58 351 6.0 -9 677.00 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 59 350 5.9 -9 677.00 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 18 00 350 5.8 -9 677.00 -43.1 -42.8 -43.2 68 0 SPO 1997 04 08 18 01 352 5.8 -9 677.00 -43.0 -42.8 -43.2 68 -99 SPO 1997 04 08 18 02 351 5.9 -9 677.00 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 18 03 352 5.8 -9 676.90 -43.1 -42.8 -43.1 68 -99 SPO 1997 04 08 18 04 352 5.8 -9 677.00 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 05 353 5.7 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 06 352 5.5 -9 676.90 -43.1 -42.9 -43.2 69 -99 SPO 1997 04 08 18 07 352 5.2 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 08 350 5.5 -9 676.90 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 18 09 349 5.5 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 10 349 5.4 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 11 349 5.8 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 12 349 5.7 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 13 350 6.0 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 14 350 5.8 -9 676.90 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 18 15 350 6.0 -9 676.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 16 351 5.9 -9 676.90 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 18 17 350 5.9 -9 676.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 18 350 5.9 -9 676.90 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 18 19 350 5.8 -9 676.90 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 18 20 350 5.7 -9 676.80 -43.2 -43.2 -43.2 70 -99 SPO 1997 04 08 18 21 350 5.7 -9 676.80 -43.2 -43.2 -43.2 71 -99 SPO 1997 04 08 18 22 350 5.8 -9 676.80 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 18 23 350 5.5 -9 676.80 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 24 350 5.3 -9 676.80 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 25 349 5.4 -9 676.80 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 18 26 350 5.4 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 27 350 5.2 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 28 351 5.1 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 29 352 5.2 -9 676.80 -43.2 -43.2 -43.3 68 -99 SPO 1997 04 08 18 30 352 5.2 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 31 352 5.4 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 32 352 5.2 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 33 352 5.2 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 34 353 5.3 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 35 352 5.1 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 36 351 4.9 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 37 351 4.9 -9 676.70 -43.3 -43.4 -43.3 69 -99 SPO 1997 04 08 18 38 352 5.0 -9 676.80 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 39 352 5.0 -9 676.70 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 40 350 5.0 -9 676.80 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 41 351 5.0 -9 676.80 -43.4 -43.4 -43.4 69 -99 SPO 1997 04 08 18 42 350 5.1 -9 676.80 -43.4 -43.3 -43.4 69 -99 SPO 1997 04 08 18 43 349 4.9 -9 676.80 -43.3 -43.3 -43.4 68 -99 SPO 1997 04 08 18 44 346 4.8 -9 676.80 -43.3 -43.4 -43.5 68 -99 SPO 1997 04 08 18 45 348 4.8 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 46 349 4.8 -9 676.80 -43.4 -43.3 -43.5 69 -99 SPO 1997 04 08 18 47 348 4.5 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 48 346 4.3 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 49 346 4.5 -9 676.80 -43.5 -43.4 -43.6 69 -99 SPO 1997 04 08 18 50 350 4.5 -9 676.80 -43.5 -43.5 -43.6 68 -99 SPO 1997 04 08 18 51 350 4.5 -9 676.80 -43.5 -43.6 -43.6 68 -99 SPO 1997 04 08 18 52 350 4.3 -9 676.80 -43.6 -43.6 -43.6 68 -99 SPO 1997 04 08 18 53 350 4.3 -9 676.90 -43.5 -43.6 -43.6 68 -99 SPO 1997 04 08 18 54 351 4.1 -9 676.80 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 55 350 4.1 -9 676.90 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 56 350 4.1 -9 676.90 -43.6 -43.6 -43.6 69 -99 SPO 1997 04 08 18 57 348 3.9 -9 676.90 -43.6 -43.6 -43.6 69 -99 SPO 1997 04 08 18 58 351 3.7 -9 676.90 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 59 350 3.4 -9 676.90 -43.6 -43.6 -43.7 68 -99 SPO 1997 04 08 19 00 -999 -99.9 -9 676.70 -43.7 -43.2 -43.8 68 0 SPO 1997 04 08 19 01 352 2.8 -9 677.00 -43.7 -43.6 -43.7 69 -99 SPO 1997 04 08 19 02 352 3.0 -9 677.00 -43.6 -43.7 -43.7 69 -99 SPO 1997 04 08 19 03 351 2.6 -9 676.90 -43.6 -43.7 -43.7 69 -99 SPO 1997 04 08 19 04 345 2.8 -9 677.00 -43.7 -43.7 -43.8 69 -99 SPO 1997 04 08 19 05 345 2.5 -9 677.00 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 06 344 2.6 -9 677.00 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 07 343 2.6 -9 676.90 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 08 345 2.7 -9 676.90 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 09 344 2.9 -9 676.90 -43.7 -43.5 -43.7 68 -99 SPO 1997 04 08 19 10 344 3.0 -9 676.90 -43.7 -43.5 -43.8 68 -99 SPO 1997 04 08 19 11 346 3.1 -9 676.90 -43.7 -43.5 -43.8 68 -99 SPO 1997 04 08 19 12 346 3.1 -9 676.90 -43.7 -43.4 -43.8 68 -99 SPO 1997 04 08 19 13 347 3.4 -9 676.80 -43.7 -43.4 -43.8 69 -99 SPO 1997 04 08 19 14 347 3.3 -9 676.80 -43.7 -43.5 -43.8 69 -99 SPO 1997 04 08 19 15 351 3.5 -9 676.80 -43.7 -43.6 -43.8 69 -99 SPO 1997 04 08 19 16 353 3.4 -9 676.80 -43.7 -43.6 -43.8 69 -99 SPO 1997 04 08 19 17 355 3.2 -9 676.80 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 18 355 3.2 -9 676.80 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 19 357 3.4 -9 676.80 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 20 357 3.3 -9 676.80 -43.8 -43.6 -43.8 68 -99 SPO 1997 04 08 19 21 356 3.5 -9 676.80 -43.8 -43.4 -43.9 68 -99 SPO 1997 04 08 19 22 354 3.5 -9 676.80 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 23 353 3.5 -9 676.80 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 24 350 3.4 -9 676.80 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 25 350 3.4 -9 676.80 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 26 348 3.4 -9 676.80 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 27 349 3.5 -9 676.70 -43.7 -43.1 -43.8 68 -99 SPO 1997 04 08 19 28 349 3.6 -9 676.70 -43.7 -43.1 -43.8 68 -99 SPO 1997 04 08 19 29 349 3.3 -9 676.70 -43.7 -43.1 -43.7 68 -99 SPO 1997 04 08 19 30 -999 -99.9 -9 676.70 -43.7 -43.2 -43.7 69 -99 SPO 1997 04 08 19 31 355 3.2 -9 676.70 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 32 354 3.1 -9 676.70 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 33 354 3.0 -9 676.70 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 34 351 3.2 -9 676.60 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 35 350 3.2 -9 676.60 -43.7 -43.4 -43.8 68 -99 SPO 1997 04 08 19 36 351 3.2 -9 676.60 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 37 350 3.4 -9 676.60 -43.8 -43.2 -43.9 69 -99 SPO 1997 04 08 19 38 348 3.4 -9 676.60 -43.8 -43.2 -43.8 68 -99 SPO 1997 04 08 19 39 347 3.4 -9 676.60 -43.8 -43.2 -43.8 69 -99 SPO 1997 04 08 19 40 346 3.5 -9 676.60 -43.8 -43.1 -43.9 69 -99 SPO 1997 04 08 19 41 346 3.6 -9 676.50 -43.8 -43.0 -43.8 69 -99 SPO 1997 04 08 19 42 346 3.9 -9 676.60 -43.8 -42.9 -43.8 69 -99 SPO 1997 04 08 19 43 346 4.0 -9 676.60 -43.8 -42.8 -43.8 70 -99 SPO 1997 04 08 19 44 346 4.0 -9 676.50 -43.7 -42.8 -43.8 68 -99 SPO 1997 04 08 19 45 344 4.1 -9 676.50 -43.7 -42.6 -43.8 68 -99 SPO 1997 04 08 19 46 343 4.4 -9 676.50 -43.7 -42.6 -43.8 68 -99 SPO 1997 04 08 19 47 343 4.5 -9 676.50 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 19 48 342 4.7 -9 676.50 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 19 49 342 4.8 -9 676.50 -43.7 -42.4 -43.7 68 -99 SPO 1997 04 08 19 50 342 4.9 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 51 342 5.0 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 52 343 5.0 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 53 343 5.0 -9 676.50 -43.6 -42.3 -43.7 68 -99 SPO 1997 04 08 19 54 344 5.0 -9 676.50 -43.6 -42.3 -43.7 68 -99 SPO 1997 04 08 19 55 345 5.0 -9 676.40 -43.6 -42.4 -43.7 68 -99 SPO 1997 04 08 19 56 344 5.1 -9 676.40 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 19 57 345 5.3 -9 676.40 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 19 58 344 5.5 -9 676.40 -43.7 -42.3 -43.8 69 -99 SPO 1997 04 08 19 59 344 5.6 -9 676.40 -43.7 -42.2 -43.7 69 -99 SPO 1997 04 08 20 00 342 5.6 -9 676.40 -43.7 -42.2 -43.7 69 0 SPO 1997 04 08 20 01 340 5.5 -9 676.40 -43.6 -42.2 -43.7 68 -99 SPO 1997 04 08 20 02 339 5.4 -9 676.40 -43.6 -42.2 -43.7 68 -99 SPO 1997 04 08 20 03 340 5.4 -9 676.40 -43.6 -42.2 -43.6 68 -99 SPO 1997 04 08 20 04 342 5.2 -9 676.40 -43.6 -42.2 -43.6 68 -99 SPO 1997 04 08 20 05 344 4.9 -9 676.40 -43.6 -42.3 -43.6 69 -99 SPO 1997 04 08 20 06 345 4.8 -9 676.40 -43.6 -42.4 -43.7 69 -99 SPO 1997 04 08 20 07 346 4.9 -9 676.40 -43.6 -42.4 -43.8 69 -99 SPO 1997 04 08 20 08 346 4.8 -9 676.40 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 09 347 4.8 -9 676.40 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 10 348 4.8 -9 676.30 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 20 11 349 4.9 -9 676.30 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 12 349 5.0 -9 676.30 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 20 13 350 4.9 -9 676.30 -43.8 -42.5 -43.9 69 -99 SPO 1997 04 08 20 14 349 5.1 -9 676.30 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 15 347 4.9 -9 676.30 -43.7 -42.5 -43.8 67 -99 SPO 1997 04 08 20 16 345 5.2 -9 676.30 -43.8 -42.6 -43.8 68 -99 SPO 1997 04 08 20 17 344 5.3 -9 676.30 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 18 343 5.4 -9 676.20 -43.8 -42.4 -43.8 68 -99 SPO 1997 04 08 20 19 342 5.6 -9 676.20 -43.7 -42.2 -43.8 68 -99 SPO 1997 04 08 20 20 342 5.5 -9 676.20 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 20 21 343 5.6 -9 676.20 -43.7 -42.3 -43.7 69 -99 SPO 1997 04 08 20 22 345 5.5 -9 676.20 -43.7 -42.3 -43.8 69 -99 SPO 1997 04 08 20 23 347 5.3 -9 676.20 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 24 347 5.3 -9 676.20 -43.8 -42.4 -43.8 70 -99 SPO 1997 04 08 20 25 346 5.1 -9 676.20 -43.8 -42.5 -43.8 69 -99 SPO 1997 04 08 20 26 351 5.6 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 27 352 5.5 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 28 351 5.6 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 29 351 5.5 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 30 352 5.5 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 31 355 5.3 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 32 357 5.2 -9 676.20 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 33 358 5.1 -9 676.20 -43.8 -42.6 -43.8 68 -99 SPO 1997 04 08 20 34 356 5.1 -9 676.20 -43.8 -42.6 -43.9 69 -99 SPO 1997 04 08 20 35 356 4.9 -9 676.20 -43.8 -42.7 -43.9 68 -99 SPO 1997 04 08 20 36 358 5.0 -9 676.20 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 37 357 4.8 -9 676.20 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 38 357 5.0 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 39 357 4.9 -9 676.20 -43.8 -43.0 -43.9 68 -99 SPO 1997 04 08 20 40 357 5.3 -9 676.20 -43.9 -43.0 -43.9 69 -99 SPO 1997 04 08 20 41 354 5.3 -9 676.20 -43.9 -43.0 -43.9 69 -99 SPO 1997 04 08 20 42 353 5.4 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 43 352 5.4 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 44 353 5.6 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 45 352 5.6 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 46 351 5.7 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 47 350 5.6 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 48 351 5.8 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 49 352 5.7 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 50 352 5.8 -9 676.10 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 51 353 5.8 -9 676.10 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 52 355 5.7 -9 676.10 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 53 356 5.7 -9 676.10 -43.8 -43.0 -43.9 69 -99 SPO 1997 04 08 20 54 356 5.7 -9 676.10 -43.8 -43.1 -43.9 69 -99 SPO 1997 04 08 20 55 356 5.6 -9 676.10 -43.9 -43.2 -43.9 70 -99 SPO 1997 04 08 20 56 356 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 57 356 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 58 356 5.8 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 59 355 5.6 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 00 355 5.7 -9 676.10 -43.9 -43.2 -44.0 68 0 SPO 1997 04 08 21 01 353 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 02 353 5.6 -9 676.10 -43.9 -43.3 -44.0 69 -99 SPO 1997 04 08 21 03 352 5.6 -9 676.10 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 04 352 5.5 -9 676.10 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 05 351 5.7 -9 676.10 -43.9 -43.2 -44.0 68 -99 SPO 1997 04 08 21 06 349 5.7 -9 676.10 -44.0 -43.2 -44.0 69 -99 SPO 1997 04 08 21 07 349 5.7 -9 676.10 -44.0 -43.1 -43.9 69 -99 SPO 1997 04 08 21 08 352 5.7 -9 676.10 -43.8 -43.1 -43.9 68 -99 SPO 1997 04 08 21 09 352 5.4 -9 676.10 -43.8 -43.2 -44.0 68 -99 SPO 1997 04 08 21 10 352 5.6 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 11 353 5.4 -9 676.00 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 12 353 5.5 -9 676.00 -44.0 -43.4 -44.1 68 -99 SPO 1997 04 08 21 13 354 5.5 -9 676.00 -44.0 -43.5 -44.1 68 -99 SPO 1997 04 08 21 14 352 5.5 -9 676.00 -44.0 -43.5 -44.1 68 -99 SPO 1997 04 08 21 15 352 5.6 -9 676.00 -44.0 -43.5 -44.1 69 -99 SPO 1997 04 08 21 16 353 5.6 -9 676.00 -44.0 -43.6 -44.1 69 -99 SPO 1997 04 08 21 17 354 5.6 -9 676.00 -44.0 -43.6 -44.1 68 -99 SPO 1997 04 08 21 18 355 5.5 -9 676.00 -44.0 -43.8 -44.1 68 -99 SPO 1997 04 08 21 19 355 5.6 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 20 355 5.6 -9 676.00 -44.0 -43.9 -44.2 68 -99 SPO 1997 04 08 21 21 356 5.7 -9 676.00 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 22 356 6.0 -9 676.00 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 23 357 5.9 -9 676.00 -44.1 -43.9 -44.1 68 -99 SPO 1997 04 08 21 24 355 6.0 -9 676.00 -44.1 -43.9 -44.2 67 -99 SPO 1997 04 08 21 25 354 6.0 -9 676.00 -44.1 -43.9 -44.1 67 -99 SPO 1997 04 08 21 26 353 6.0 -9 676.00 -44.1 -43.9 -44.2 67 -99 SPO 1997 04 08 21 27 352 5.8 -9 676.00 -44.1 -43.9 -44.1 68 -99 SPO 1997 04 08 21 28 352 5.9 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 29 352 5.6 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 30 354 5.9 -9 675.90 -44.0 -44.0 -44.1 68 -99 SPO 1997 04 08 21 31 356 5.9 -9 675.90 -44.1 -44.0 -44.2 69 -99 SPO 1997 04 08 21 32 356 6.0 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 33 356 6.0 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 34 354 6.1 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 35 353 6.0 -9 675.90 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 36 353 6.1 -9 675.90 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 37 353 6.0 -9 675.90 -44.1 -43.9 -44.2 68 -99 SPO 1997 04 08 21 38 353 6.0 -9 675.90 -44.1 -43.9 -44.2 66 -99 SPO 1997 04 08 21 39 353 6.1 -9 675.90 -44.1 -44.0 -44.2 66 -99 SPO 1997 04 08 21 40 354 6.0 -9 675.90 -44.1 -44.0 -44.2 67 -99 SPO 1997 04 08 21 41 355 6.1 -9 675.90 -44.0 -44.0 -44.2 68 -99 SPO 1997 04 08 21 42 354 6.1 -9 675.90 -44.1 -44.1 -44.2 68 -99 SPO 1997 04 08 21 43 354 6.1 -9 675.90 -44.1 -44.1 -44.2 69 -99 SPO 1997 04 08 21 44 354 6.2 -9 675.90 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 45 353 6.1 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 46 352 6.4 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 47 353 6.3 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 48 353 6.3 -9 675.80 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 49 352 6.3 -9 675.80 -44.1 -44.0 -44.2 69 -99 SPO 1997 04 08 21 50 352 6.4 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 21 51 353 6.3 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 21 52 353 6.2 -9 675.80 -44.2 -44.0 -44.2 67 -99 SPO 1997 04 08 21 53 352 6.3 -9 675.80 -44.2 -44.0 -44.2 67 -99 SPO 1997 04 08 21 54 352 6.1 -9 675.80 -44.2 -44.0 -44.2 68 -99 SPO 1997 04 08 21 55 352 6.1 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 21 56 351 6.1 -9 675.80 -44.2 -43.9 -44.2 69 -99 SPO 1997 04 08 21 57 350 6.0 -9 675.80 -44.2 -43.9 -44.2 68 -99 SPO 1997 04 08 21 58 349 5.8 -9 675.80 -44.2 -43.9 -44.3 68 -99 SPO 1997 04 08 21 59 349 5.9 -9 675.80 -44.2 -43.9 -44.2 68 -99 SPO 1997 04 08 22 00 350 6.0 -9 675.80 -44.2 -44.0 -44.3 68 0 SPO 1997 04 08 22 01 352 5.8 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 22 02 352 5.9 -9 675.80 -44.2 -44.0 -44.3 69 -99 SPO 1997 04 08 22 03 354 6.0 -9 675.80 -44.2 -44.1 -44.3 68 -99 SPO 1997 04 08 22 04 354 6.0 -9 675.80 -44.2 -44.1 -44.3 67 -99 SPO 1997 04 08 22 05 354 5.9 -9 675.80 -44.2 -44.1 -44.3 67 -99 SPO 1997 04 08 22 06 353 6.0 -9 675.80 -44.3 -44.0 -44.4 67 -99 SPO 1997 04 08 22 07 352 6.0 -9 675.80 -44.3 -44.0 -44.3 67 -99 SPO 1997 04 08 22 08 351 6.0 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 22 09 351 6.2 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 22 10 351 6.2 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 11 351 6.2 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 12 352 6.0 -9 675.80 -44.3 -44.0 -44.3 69 -99 SPO 1997 04 08 22 13 352 6.0 -9 675.80 -44.3 -44.0 -44.3 69 -99 SPO 1997 04 08 22 14 353 6.0 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 15 353 6.0 -9 675.80 -44.3 -43.9 -44.4 69 -99 SPO 1997 04 08 22 16 353 6.0 -9 675.80 -44.3 -43.9 -44.4 67 -99 SPO 1997 04 08 22 17 353 6.0 -9 675.80 -44.3 -43.9 -44.4 67 -99 SPO 1997 04 08 22 18 352 5.8 -9 675.80 -44.3 -44.0 -44.4 67 -99 SPO 1997 04 08 22 19 353 5.8 -9 675.80 -44.3 -44.0 -44.4 66 -99 SPO 1997 04 08 22 20 353 5.9 -9 675.80 -44.3 -44.0 -44.4 66 -99 SPO 1997 04 08 22 21 353 6.0 -9 675.80 -44.3 -44.1 -44.4 67 -99 SPO 1997 04 08 22 22 352 6.0 -9 675.80 -44.3 -44.1 -44.4 67 -99 SPO 1997 04 08 22 23 351 5.9 -9 675.80 -44.4 -44.1 -44.4 68 -99 SPO 1997 04 08 22 24 350 5.8 -9 675.80 -44.4 -44.2 -44.4 68 -99 SPO 1997 04 08 22 25 349 5.9 -9 675.80 -44.4 -44.2 -44.5 68 -99 SPO 1997 04 08 22 26 349 6.0 -9 675.80 -44.4 -44.2 -44.5 67 -99 SPO 1997 04 08 22 27 349 6.0 -9 675.80 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 28 349 6.0 -9 675.80 -44.4 -44.2 -44.5 67 -99 SPO 1997 04 08 22 29 350 5.9 -9 675.70 -44.4 -44.2 -44.5 68 -99 SPO 1997 04 08 22 30 351 5.9 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 31 353 6.0 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 32 354 5.8 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 33 354 5.7 -9 675.70 -44.5 -44.2 -44.5 67 -99 SPO 1997 04 08 22 34 356 5.5 -9 675.70 -44.5 -44.2 -44.5 67 -99 SPO 1997 04 08 22 35 358 5.5 -9 675.70 -44.5 -44.2 -44.6 68 -99 SPO 1997 04 08 22 36 359 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 37 360 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 38 357 5.2 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 39 357 5.3 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 40 356 5.5 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 41 356 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 42 356 5.5 -9 675.70 -44.5 -44.3 -44.6 67 -99 SPO 1997 04 08 22 43 357 5.6 -9 675.70 -44.5 -44.4 -44.6 67 -99 SPO 1997 04 08 22 44 359 5.6 -9 675.70 -44.5 -44.4 -44.6 67 -99 SPO 1997 04 08 22 45 358 5.6 -9 675.70 -44.6 -44.4 -44.7 67 -99 SPO 1997 04 08 22 46 357 5.6 -9 675.70 -44.6 -44.4 -44.7 67 -99 SPO 1997 04 08 22 47 357 5.6 -9 675.70 -44.5 -44.3 -44.7 67 -99 SPO 1997 04 08 22 48 356 5.6 -9 675.70 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 49 357 5.7 -9 675.70 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 50 357 5.8 -9 675.60 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 51 357 5.8 -9 675.60 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 52 355 5.7 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 22 53 353 5.6 -9 675.60 -44.7 -44.2 -44.7 69 -99 SPO 1997 04 08 22 54 352 5.8 -9 675.60 -44.7 -44.2 -44.7 69 -99 SPO 1997 04 08 22 55 351 5.8 -9 675.60 -44.7 -44.1 -44.7 69 -99 SPO 1997 04 08 22 56 352 5.8 -9 675.60 -44.7 -44.1 -44.7 68 -99 SPO 1997 04 08 22 57 352 6.0 -9 675.60 -44.7 -44.0 -44.7 67 -99 SPO 1997 04 08 22 58 353 5.9 -9 675.60 -44.6 -44.0 -44.7 66 -99 SPO 1997 04 08 22 59 354 5.8 -9 675.60 -44.6 -44.1 -44.7 66 -99 SPO 1997 04 08 23 00 356 5.7 -9 675.60 -44.6 -44.1 -44.7 66 0 SPO 1997 04 08 23 01 357 5.8 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 02 358 5.8 -9 675.60 -44.7 -44.2 -44.7 68 -99 SPO 1997 04 08 23 03 357 6.0 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 04 355 5.9 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 05 354 6.2 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 06 352 6.0 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 07 351 6.0 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 08 352 6.2 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 09 352 6.1 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 10 353 6.0 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 11 355 5.8 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 12 357 5.9 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 13 359 5.9 -9 675.60 -44.7 -44.1 -44.7 67 -99 SPO 1997 04 08 23 14 360 6.1 -9 675.60 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 15 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 16 358 6.1 -9 675.50 -44.7 -44.0 -44.7 68 -99 SPO 1997 04 08 23 17 358 6.2 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 18 357 6.2 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 19 358 6.1 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 20 357 6.2 -9 675.50 -44.7 -43.9 -44.7 67 -99 SPO 1997 04 08 23 21 358 6.3 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 22 358 6.4 -9 675.50 -44.6 -43.8 -44.7 67 -99 SPO 1997 04 08 23 23 357 6.4 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 24 357 6.4 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 25 358 6.3 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 26 358 6.2 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 27 359 6.2 -9 675.50 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 28 359 6.1 -9 675.50 -44.6 -43.9 -44.8 67 -99 SPO 1997 04 08 23 29 359 6.0 -9 675.50 -44.6 -43.9 -44.8 67 -99 SPO 1997 04 08 23 30 359 6.1 -9 675.50 -44.7 -43.8 -44.8 68 -99 SPO 1997 04 08 23 31 359 6.2 -9 675.50 -44.7 -43.8 -44.8 68 -99 SPO 1997 04 08 23 32 358 6.2 -9 675.50 -44.7 -43.8 -44.7 68 -99 SPO 1997 04 08 23 33 358 6.4 -9 675.50 -44.7 -43.7 -44.8 68 -99 SPO 1997 04 08 23 34 359 6.4 -9 675.50 -44.7 -43.7 -44.8 67 -99 SPO 1997 04 08 23 35 360 6.4 -9 675.50 -44.7 -43.7 -44.7 67 -99 SPO 1997 04 08 23 36 359 6.3 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 37 357 6.1 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 38 0 6.2 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 39 2 6.3 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 40 2 6.4 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 41 1 6.5 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 42 1 6.5 -9 675.50 -44.7 -43.8 -44.7 67 -99 SPO 1997 04 08 23 43 359 6.4 -9 675.50 -44.7 -43.9 -44.7 67 -99 SPO 1997 04 08 23 44 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 45 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 46 357 6.2 -9 675.50 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 47 358 6.2 -9 675.50 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 48 358 6.3 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 49 359 6.4 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 50 359 6.4 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 51 360 6.5 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 52 359 6.3 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 53 359 6.6 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 54 358 6.7 -9 675.40 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 55 357 6.8 -9 675.40 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 56 355 6.5 -9 675.40 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 57 356 6.5 -9 675.40 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 58 357 6.4 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 08 23 59 360 6.7 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 00 -999 -99.9 -9 675.30 -44.7 -43.8 -44.8 -99 0 SPO 1997 04 09 00 01 360 6.9 -9 675.30 -44.7 -43.9 -44.8 -99 -99 SPO 1997 04 09 00 02 358 6.8 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 03 357 6.9 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 04 355 6.9 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 05 354 6.8 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 06 353 6.8 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 07 354 6.6 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 08 356 6.5 -9 675.30 -44.7 -44.2 -44.8 -99 -99 SPO 1997 04 09 00 09 357 6.3 -9 675.30 -44.6 -44.2 -44.8 -99 -99 SPO 1997 04 09 00 10 357 6.2 -9 675.30 -44.7 -44.3 -44.8 -99 -99 SPO 1997 04 09 00 11 356 6.2 -9 675.30 -44.7 -44.3 -44.8 -99 -99 SPO 1997 04 09 00 12 357 6.2 -9 675.30 -44.7 -44.4 -44.8 -99 -99 SPO 1997 04 09 00 13 356 6.1 -9 675.30 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 00 14 355 6.2 -9 675.30 -44.8 -44.4 -44.8 69 -99 SPO 1997 04 09 00 15 354 6.0 -9 675.30 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 16 354 6.0 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 17 354 6.1 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 18 355 6.2 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 19 355 6.0 -9 675.30 -44.7 -44.3 -44.8 67 -99 SPO 1997 04 09 00 20 356 6.0 -9 675.30 -44.8 -44.3 -44.9 68 -99 SPO 1997 04 09 00 21 357 6.0 -9 675.20 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 22 358 6.0 -9 675.20 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 23 358 5.8 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 24 358 6.0 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 25 357 6.0 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 26 356 6.0 -9 675.20 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 00 27 355 6.0 -9 675.20 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 00 28 354 6.0 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 29 354 6.3 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 30 354 5.9 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 31 355 5.8 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 32 354 5.9 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 33 355 5.7 -9 675.20 -44.9 -44.5 -44.9 68 -99 SPO 1997 04 09 00 34 356 5.7 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 35 357 5.4 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 36 357 5.3 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 37 357 5.4 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 38 357 5.4 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 39 356 5.1 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 40 357 5.3 -9 675.20 -44.9 -44.7 -45.0 67 -99 SPO 1997 04 09 00 41 357 5.6 -9 675.20 -44.9 -44.7 -45.0 67 -99 SPO 1997 04 09 00 42 357 5.6 -9 675.20 -44.9 -44.6 -45.0 67 -99 SPO 1997 04 09 00 43 356 5.9 -9 675.20 -44.9 -44.7 -45.0 66 -99 SPO 1997 04 09 00 44 356 5.7 -9 675.20 -44.9 -44.7 -45.0 66 -99 SPO 1997 04 09 00 45 357 6.0 -9 675.20 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 46 356 5.9 -9 675.20 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 47 357 5.7 -9 675.10 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 48 357 5.7 -9 675.10 -44.9 -44.8 -45.1 67 -99 SPO 1997 04 09 00 49 357 5.7 -9 675.10 -45.0 -44.8 -45.1 68 -99 SPO 1997 04 09 00 50 357 5.4 -9 675.10 -44.9 -44.8 -45.1 67 -99 SPO 1997 04 09 00 51 356 5.2 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 52 354 5.0 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 53 353 4.7 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 54 351 4.7 -9 675.20 -45.1 -45.0 -45.2 69 -99 SPO 1997 04 09 00 55 352 4.9 -9 675.20 -45.1 -45.0 -45.2 68 -99 SPO 1997 04 09 00 56 351 5.0 -9 675.20 -45.1 -44.9 -45.2 67 -99 SPO 1997 04 09 00 57 353 5.0 -9 675.10 -45.1 -44.9 -45.2 66 -99 SPO 1997 04 09 00 58 353 5.0 -9 675.10 -45.1 -44.9 -45.2 66 -99 SPO 1997 04 09 00 59 354 5.2 -9 675.10 -45.1 -44.9 -45.2 67 -99 SPO 1997 04 09 01 00 354 5.0 -9 675.10 -45.1 -44.9 -45.2 67 0 SPO 1997 04 09 01 01 355 5.0 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 02 355 5.1 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 03 356 5.0 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 04 356 5.0 -9 675.00 -45.2 -44.9 -45.3 67 -99 SPO 1997 04 09 01 05 355 5.1 -9 675.00 -45.2 -44.9 -45.2 67 -99 SPO 1997 04 09 01 06 354 5.1 -9 675.00 -45.2 -45.0 -45.2 68 -99 SPO 1997 04 09 01 07 355 5.1 -9 675.00 -45.2 -45.0 -45.2 68 -99 SPO 1997 04 09 01 08 355 5.1 -9 675.00 -45.2 -45.0 -45.3 68 -99 SPO 1997 04 09 01 09 354 5.1 -9 675.00 -45.2 -45.0 -45.3 68 -99 SPO 1997 04 09 01 10 354 5.2 -9 675.00 -45.2 -45.0 -45.3 66 -99 SPO 1997 04 09 01 11 351 5.2 -9 675.00 -45.2 -45.0 -45.3 66 -99 SPO 1997 04 09 01 12 352 5.8 -9 675.00 -45.2 -44.9 -45.3 66 -99 SPO 1997 04 09 01 13 353 5.8 -9 675.00 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 14 353 5.7 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 15 353 5.6 -9 674.90 -45.2 -44.7 -45.3 68 -99 SPO 1997 04 09 01 16 354 5.7 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 17 355 5.6 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 18 356 5.6 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 19 355 5.5 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 20 355 5.6 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 21 356 5.2 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 22 357 5.2 -9 674.90 -45.3 -44.8 -45.3 68 -99 SPO 1997 04 09 01 23 357 5.2 -9 674.90 -45.3 -44.9 -45.3 67 -99 SPO 1997 04 09 01 24 357 5.5 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 25 356 5.5 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 26 355 5.7 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 27 354 5.7 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 28 353 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 29 354 5.7 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 30 352 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 31 351 5.5 -9 674.80 -45.2 -44.9 -45.3 68 -99 SPO 1997 04 09 01 32 350 5.7 -9 674.80 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 33 349 5.6 -9 674.80 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 34 348 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 35 349 5.5 -9 674.80 -45.2 -44.7 -45.3 66 -99 SPO 1997 04 09 01 36 348 5.8 -9 674.80 -45.2 -44.6 -45.3 66 -99 SPO 1997 04 09 01 37 349 5.8 -9 674.70 -45.2 -44.6 -45.2 66 -99 SPO 1997 04 09 01 38 348 6.0 -9 674.70 -45.2 -44.6 -45.3 67 -99 SPO 1997 04 09 01 39 348 6.1 -9 674.70 -45.2 -44.5 -45.2 68 -99 SPO 1997 04 09 01 40 347 6.1 -9 674.70 -45.2 -44.4 -45.2 68 -99 SPO 1997 04 09 01 41 347 6.1 -9 674.70 -45.2 -44.4 -45.2 68 -99 SPO 1997 04 09 01 42 347 6.0 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 43 347 6.1 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 44 347 6.2 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 45 347 6.1 -9 674.60 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 01 46 347 6.0 -9 674.60 -45.1 -44.6 -45.2 68 -99 SPO 1997 04 09 01 47 347 6.0 -9 674.60 -45.1 -44.7 -45.1 68 -99 SPO 1997 04 09 01 48 347 6.1 -9 674.60 -45.1 -44.7 -45.2 67 -99 SPO 1997 04 09 01 49 346 6.2 -9 674.60 -45.0 -44.7 -45.2 67 -99 SPO 1997 04 09 01 50 346 6.1 -9 674.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 09 01 51 345 6.1 -9 674.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 09 01 52 345 6.0 -9 674.50 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 01 53 344 6.1 -9 674.50 -45.1 -44.6 -45.2 68 -99 SPO 1997 04 09 01 54 343 6.4 -9 674.50 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 01 55 343 6.4 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 01 56 343 6.5 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 57 343 6.7 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 58 343 6.7 -9 674.50 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 01 59 343 6.8 -9 674.50 -45.1 -44.2 -45.2 67 -99 SPO 1997 04 09 02 00 342 6.8 -9 674.40 -45.1 -44.2 -45.2 67 0 SPO 1997 04 09 02 01 341 6.7 -9 674.50 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 02 342 6.7 -9 674.40 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 03 342 6.7 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 04 344 6.7 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 05 344 6.6 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 06 345 6.6 -9 674.40 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 07 346 6.5 -9 674.40 -45.1 -44.2 -45.2 67 -99 SPO 1997 04 09 02 08 347 6.5 -9 674.40 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 02 09 348 6.6 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 10 347 6.5 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 11 347 6.5 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 12 346 6.4 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 13 346 6.2 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 14 346 6.1 -9 674.40 -45.1 -44.4 -45.2 66 -99 SPO 1997 04 09 02 15 346 6.0 -9 674.40 -45.1 -44.3 -45.1 66 -99 SPO 1997 04 09 02 16 346 5.9 -9 674.40 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 02 17 347 5.7 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 02 18 347 5.8 -9 674.50 -45.1 -44.4 -45.2 68 -99 SPO 1997 04 09 02 19 348 5.7 -9 674.40 -45.1 -44.4 -45.1 68 -99 SPO 1997 04 09 02 20 348 5.5 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 21 347 5.3 -9 674.40 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 22 347 5.4 -9 674.40 -45.1 -44.4 -45.2 68 -99 SPO 1997 04 09 02 23 346 5.4 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 24 346 5.4 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 25 347 5.4 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 26 347 5.5 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 27 348 5.5 -9 674.40 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 28 349 5.6 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 29 348 5.4 -9 674.40 -45.1 -44.6 -45.2 66 -99 SPO 1997 04 09 02 30 347 5.6 -9 674.40 -45.1 -44.6 -45.2 66 -99 SPO 1997 04 09 02 31 348 5.4 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 32 347 5.4 -9 674.40 -45.1 -44.7 -45.2 68 -99 SPO 1997 04 09 02 33 347 5.5 -9 674.40 -45.1 -44.7 -45.2 68 -99 SPO 1997 04 09 02 34 347 5.5 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 35 346 5.5 -9 674.40 -45.2 -44.6 -45.2 68 -99 SPO 1997 04 09 02 36 347 5.4 -9 674.40 -45.2 -44.6 -45.2 68 -99 SPO 1997 04 09 02 37 347 5.5 -9 674.40 -45.2 -44.6 -45.3 68 -99 SPO 1997 04 09 02 38 348 5.6 -9 674.40 -45.2 -44.6 -45.3 68 -99 SPO 1997 04 09 02 39 348 5.6 -9 674.40 -45.2 -44.5 -45.3 68 -99 SPO 1997 04 09 02 40 347 5.8 -9 674.40 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 02 41 346 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 42 345 6.0 -9 674.30 -45.2 -44.4 -45.3 66 -99 SPO 1997 04 09 02 43 345 6.1 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 44 345 6.3 -9 674.30 -45.2 -44.4 -45.3 66 -99 SPO 1997 04 09 02 45 345 6.1 -9 674.30 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 02 46 345 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 47 344 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 48 345 6.1 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 49 346 6.1 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 50 346 6.2 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 51 347 6.2 -9 674.30 -45.3 -44.6 -45.4 67 -99 SPO 1997 04 09 02 52 348 6.1 -9 674.20 -45.4 -44.6 -45.4 68 -99 SPO 1997 04 09 02 53 348 6.0 -9 674.20 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 02 54 347 5.9 -9 674.20 -45.4 -44.6 -45.5 66 -99 SPO 1997 04 09 02 55 346 6.0 -9 674.20 -45.5 -44.6 -45.5 67 -99 SPO 1997 04 09 02 56 345 6.0 -9 674.20 -45.5 -44.7 -45.6 66 -99 SPO 1997 04 09 02 57 345 6.0 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 02 58 345 5.9 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 02 59 344 5.9 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 03 00 345 6.0 -9 674.20 -45.5 -44.7 -45.6 67 0 SPO 1997 04 09 03 01 345 6.2 -9 674.20 -45.6 -44.7 -45.6 68 -99 SPO 1997 04 09 03 02 345 6.4 -9 674.10 -45.6 -44.6 -45.7 68 -99 SPO 1997 04 09 03 03 345 6.4 -9 674.10 -45.6 -44.6 -45.7 68 -99 SPO 1997 04 09 03 04 344 6.3 -9 674.10 -45.6 -44.6 -45.7 67 -99 SPO 1997 04 09 03 05 344 6.3 -9 674.10 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 06 344 6.3 -9 674.10 -45.6 -44.5 -45.6 67 -99 SPO 1997 04 09 03 07 343 6.3 -9 674.10 -45.6 -44.4 -45.6 66 -99 SPO 1997 04 09 03 08 344 6.5 -9 674.10 -45.6 -44.4 -45.6 66 -99 SPO 1997 04 09 03 09 344 6.5 -9 674.10 -45.6 -44.5 -45.6 66 -99 SPO 1997 04 09 03 10 344 6.5 -9 674.10 -45.5 -44.5 -45.6 66 -99 SPO 1997 04 09 03 11 343 6.5 -9 674.10 -45.5 -44.4 -45.6 67 -99 SPO 1997 04 09 03 12 344 6.5 -9 674.00 -45.5 -44.4 -45.6 67 -99 SPO 1997 04 09 03 13 344 6.4 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 14 343 6.3 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 15 343 6.1 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 16 343 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 17 345 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 18 345 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 19 346 6.2 -9 674.00 -45.6 -44.5 -45.6 69 -99 SPO 1997 04 09 03 20 346 6.0 -9 674.00 -45.6 -44.5 -45.6 68 -99 SPO 1997 04 09 03 21 346 6.3 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 22 345 6.3 -9 674.00 -45.6 -44.5 -45.6 66 -99 SPO 1997 04 09 03 23 345 6.2 -9 674.00 -45.6 -44.4 -45.6 67 -99 SPO 1997 04 09 03 24 344 6.1 -9 674.00 -45.6 -44.4 -45.6 67 -99 SPO 1997 04 09 03 25 344 6.0 -9 674.00 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 03 26 345 6.1 -9 674.00 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 03 27 346 6.1 -9 674.00 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 03 28 346 6.1 -9 674.00 -45.6 -44.4 -45.7 66 -99 SPO 1997 04 09 03 29 347 6.0 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 30 348 5.9 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 31 349 6.0 -9 674.00 -45.7 -44.6 -45.8 67 -99 SPO 1997 04 09 03 32 350 6.2 -9 674.00 -45.7 -44.6 -45.8 67 -99 SPO 1997 04 09 03 33 350 6.0 -9 674.00 -45.7 -44.6 -45.8 66 -99 SPO 1997 04 09 03 34 350 6.1 -9 674.00 -45.7 -44.6 -45.8 66 -99 SPO 1997 04 09 03 35 350 6.2 -9 674.00 -45.8 -44.6 -45.8 66 -99 SPO 1997 04 09 03 36 351 6.2 -9 673.90 -45.8 -44.5 -45.8 66 -99 SPO 1997 04 09 03 37 351 6.3 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 38 352 6.4 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 39 353 6.5 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 40 353 6.4 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 41 352 6.3 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 42 352 6.2 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 43 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 44 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 45 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 46 352 6.2 -9 673.90 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 03 47 353 6.4 -9 673.90 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 03 48 353 6.3 -9 673.90 -45.8 -44.5 -45.9 66 -99 SPO 1997 04 09 03 49 354 6.1 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 50 355 6.2 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 51 354 6.2 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 52 352 6.2 -9 673.80 -45.8 -44.6 -45.9 67 -99 SPO 1997 04 09 03 53 353 6.2 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 54 352 6.3 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 55 351 6.1 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 56 351 6.3 -9 673.80 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 03 57 352 6.3 -9 673.80 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 03 58 354 6.2 -9 673.80 -45.8 -44.6 -45.8 68 -99 SPO 1997 04 09 03 59 353 6.2 -9 673.70 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 04 00 353 6.2 -9 673.70 -45.8 -44.7 -45.9 66 0 SPO 1997 04 09 04 01 351 6.0 -9 673.70 -45.8 -44.8 -45.9 66 -99 SPO 1997 04 09 04 02 350 6.0 -9 673.70 -45.8 -44.8 -45.9 66 -99 SPO 1997 04 09 04 03 351 6.0 -9 673.70 -45.8 -44.8 -45.8 67 -99 SPO 1997 04 09 04 04 352 6.0 -9 673.70 -45.8 -44.8 -45.9 68 -99 SPO 1997 04 09 04 05 352 6.0 -9 673.70 -45.8 -44.8 -45.9 68 -99 SPO 1997 04 09 04 06 352 5.8 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 07 351 5.8 -9 673.70 -45.8 -44.9 -45.9 66 -99 SPO 1997 04 09 04 08 351 5.9 -9 673.70 -45.8 -44.9 -45.8 66 -99 SPO 1997 04 09 04 09 350 6.0 -9 673.70 -45.8 -44.9 -45.8 67 -99 SPO 1997 04 09 04 10 350 6.0 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 11 349 5.9 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 12 349 6.1 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 13 350 6.2 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 14 350 6.0 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 15 349 6.0 -9 673.70 -45.8 -45.0 -45.9 66 -99 SPO 1997 04 09 04 16 349 6.0 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 17 348 6.0 -9 673.70 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 09 04 18 348 5.8 -9 673.70 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 09 04 19 349 6.0 -9 673.70 -45.9 -45.1 -46.0 68 -99 SPO 1997 04 09 04 20 350 5.9 -9 673.70 -45.9 -45.2 -46.0 68 -99 SPO 1997 04 09 04 21 352 5.9 -9 673.70 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 22 353 6.0 -9 673.60 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 23 354 6.0 -9 673.60 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 24 354 6.0 -9 673.60 -45.9 -45.1 -46.0 68 -99 SPO 1997 04 09 04 25 354 5.8 -9 673.60 -46.0 -45.1 -46.1 68 -99 SPO 1997 04 09 04 26 353 6.2 -9 673.60 -46.0 -45.0 -46.1 67 -99 SPO 1997 04 09 04 27 352 6.0 -9 673.60 -46.0 -45.0 -46.1 66 -99 SPO 1997 04 09 04 28 351 6.2 -9 673.60 -46.0 -45.0 -46.1 66 -99 SPO 1997 04 09 04 29 351 6.2 -9 673.60 -46.0 -45.1 -46.0 67 -99 SPO 1997 04 09 04 30 351 6.0 -9 673.60 -46.0 -45.1 -46.1 67 -99 SPO 1997 04 09 04 31 353 6.1 -9 673.60 -46.0 -45.1 -46.1 68 -99 SPO 1997 04 09 04 32 353 6.0 -9 673.60 -46.0 -45.2 -46.1 67 -99 SPO 1997 04 09 04 33 354 5.9 -9 673.60 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 34 355 5.9 -9 673.60 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 35 354 5.9 -9 673.50 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 36 354 5.9 -9 673.50 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 37 354 6.1 -9 673.50 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 38 353 6.2 -9 673.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 09 04 39 353 6.2 -9 673.50 -46.0 -45.4 -46.1 66 -99 SPO 1997 04 09 04 40 351 6.2 -9 673.50 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 09 04 41 351 6.3 -9 673.50 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 09 04 42 351 6.4 -9 673.50 -46.0 -45.4 -46.1 67 -99 SPO 1997 04 09 04 43 349 6.2 -9 673.40 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 44 350 6.1 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 45 350 6.2 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 46 350 6.0 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 47 351 6.1 -9 673.40 -46.0 -45.5 -46.1 67 -99 SPO 1997 04 09 04 48 351 6.1 -9 673.40 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 04 49 350 5.8 -9 673.40 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 04 50 352 6.2 -9 673.40 -46.0 -45.7 -46.2 67 -99 SPO 1997 04 09 04 51 354 6.3 -9 673.40 -46.1 -45.6 -46.2 67 -99 SPO 1997 04 09 04 52 354 6.2 -9 673.40 -46.1 -45.6 -46.2 66 -99 SPO 1997 04 09 04 53 353 6.1 -9 673.40 -46.1 -45.6 -46.2 66 -99 SPO 1997 04 09 04 54 351 6.1 -9 673.40 -46.1 -45.7 -46.2 66 -99 SPO 1997 04 09 04 55 350 6.3 -9 673.40 -46.2 -45.7 -46.2 67 -99 SPO 1997 04 09 04 56 349 6.3 -9 673.40 -46.2 -45.7 -46.2 67 -99 SPO 1997 04 09 04 57 348 6.4 -9 673.40 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 04 58 347 6.3 -9 673.40 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 04 59 348 6.3 -9 673.40 -46.2 -45.6 -46.2 68 -99 SPO 1997 04 09 05 00 350 6.5 -9 673.40 -46.2 -45.6 -46.2 68 0 SPO 1997 04 09 05 01 351 6.6 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 02 351 6.6 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 03 351 6.3 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 04 352 6.2 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 05 352 6.3 -9 673.40 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 06 352 6.2 -9 673.30 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 07 352 6.2 -9 673.40 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 08 352 6.1 -9 673.30 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 05 09 353 5.9 -9 673.30 -46.2 -45.6 -46.3 68 -99 SPO 1997 04 09 05 10 353 5.9 -9 673.30 -46.2 -45.7 -46.3 68 -99 SPO 1997 04 09 05 11 353 5.9 -9 673.30 -46.2 -45.8 -46.3 67 -99 SPO 1997 04 09 05 12 353 6.0 -9 673.30 -46.2 -45.8 -46.3 67 -99 SPO 1997 04 09 05 13 353 6.0 -9 673.30 -46.2 -45.8 -46.3 66 -99 SPO 1997 04 09 05 14 353 6.2 -9 673.30 -46.2 -45.7 -46.3 67 -99 SPO 1997 04 09 05 15 353 6.3 -9 673.30 -46.2 -45.6 -46.3 67 -99 SPO 1997 04 09 05 16 353 6.4 -9 673.30 -46.2 -45.5 -46.3 67 -99 SPO 1997 04 09 05 17 353 6.5 -9 673.30 -46.2 -45.4 -46.3 66 -99 SPO 1997 04 09 05 18 352 6.3 -9 673.30 -46.2 -45.3 -46.3 66 -99 SPO 1997 04 09 05 19 352 6.3 -9 673.30 -46.2 -45.3 -46.2 66 -99 SPO 1997 04 09 05 20 351 6.5 -9 673.30 -46.2 -45.3 -46.2 66 -99 SPO 1997 04 09 05 21 352 6.5 -9 673.30 -46.2 -45.3 -46.2 67 -99 SPO 1997 04 09 05 22 352 6.5 -9 673.30 -46.2 -45.2 -46.2 67 -99 SPO 1997 04 09 05 23 351 6.3 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 24 351 6.2 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 25 354 6.4 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 26 354 6.4 -9 673.30 -46.1 -45.1 -46.1 68 -99 SPO 1997 04 09 05 27 354 6.4 -9 673.30 -46.1 -45.2 -46.2 68 -99 SPO 1997 04 09 05 28 356 6.4 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 29 357 6.4 -9 673.30 -46.1 -45.2 -46.1 67 -99 SPO 1997 04 09 05 30 357 6.2 -9 673.30 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 09 05 31 357 6.1 -9 673.30 -46.0 -45.4 -46.2 66 -99 SPO 1997 04 09 05 32 357 6.4 -9 673.20 -46.1 -45.5 -46.2 67 -99 SPO 1997 04 09 05 33 358 6.5 -9 673.20 -46.0 -45.4 -46.1 67 -99 SPO 1997 04 09 05 34 358 6.3 -9 673.20 -46.1 -45.6 -46.1 68 -99 SPO 1997 04 09 05 35 357 6.4 -9 673.20 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 05 36 356 6.3 -9 673.20 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 05 37 356 6.2 -9 673.20 -46.1 -45.7 -46.1 68 -99 SPO 1997 04 09 05 38 356 6.1 -9 673.20 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 39 356 5.9 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 40 357 5.8 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 41 356 6.0 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 42 356 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 43 355 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 44 355 6.0 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 45 354 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 46 355 6.0 -9 673.30 -46.0 -45.8 -46.0 68 -99 SPO 1997 04 09 05 47 355 6.0 -9 673.30 -46.0 -45.8 -46.0 68 -99 SPO 1997 04 09 05 48 356 6.0 -9 673.20 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 05 49 356 5.8 -9 673.20 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 05 50 355 5.9 -9 673.20 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 05 51 354 5.8 -9 673.30 -45.9 -46.0 -46.0 69 -99 SPO 1997 04 09 05 52 357 6.1 -9 673.20 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 05 53 357 5.9 -9 673.20 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 05 54 357 6.0 -9 673.20 -45.8 -45.9 -46.0 67 -99 SPO 1997 04 09 05 55 354 5.9 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 56 352 5.9 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 57 351 6.1 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 58 354 6.1 -9 673.20 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 05 59 354 6.5 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 00 354 6.4 -9 673.20 -45.8 -45.9 -45.9 68 0 SPO 1997 04 09 06 01 353 6.1 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 02 353 6.4 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 03 354 6.4 -9 673.20 -45.8 -45.9 -45.8 68 -99 SPO 1997 04 09 06 04 355 6.3 -9 673.20 -45.8 -45.9 -45.8 68 -99 SPO 1997 04 09 06 05 354 6.5 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 06 353 6.7 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 07 352 6.6 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 08 352 6.6 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 09 352 6.4 -9 673.20 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 10 351 6.7 -9 673.20 -45.6 -45.8 -45.7 66 -99 SPO 1997 04 09 06 11 352 6.7 -9 673.20 -45.6 -45.8 -45.7 66 -99 SPO 1997 04 09 06 12 352 6.6 -9 673.20 -45.6 -45.8 -45.8 68 -99 SPO 1997 04 09 06 13 351 6.5 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 14 352 6.8 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 15 352 6.6 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 16 350 6.7 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 17 351 6.8 -9 673.20 -45.6 -45.8 -45.7 67 -99 SPO 1997 04 09 06 18 351 6.8 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 19 351 6.7 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 20 351 6.9 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 21 351 6.8 -9 673.20 -45.6 -45.8 -45.7 67 -99 SPO 1997 04 09 06 22 352 7.0 -9 673.10 -45.6 -45.7 -45.7 67 -99 SPO 1997 04 09 06 23 351 7.0 -9 673.10 -45.6 -45.7 -45.7 67 -99 SPO 1997 04 09 06 24 350 7.0 -9 673.10 -45.6 -45.7 -45.6 68 -99 SPO 1997 04 09 06 25 350 7.0 -9 673.10 -45.6 -45.7 -45.6 69 -99 SPO 1997 04 09 06 26 349 7.0 -9 673.10 -45.6 -45.6 -45.6 69 -99 SPO 1997 04 09 06 27 349 6.9 -9 673.10 -45.5 -45.6 -45.6 69 -99 SPO 1997 04 09 06 28 349 7.2 -9 673.10 -45.5 -45.7 -45.6 69 -99 SPO 1997 04 09 06 29 350 7.1 -9 673.10 -45.5 -45.7 -45.6 69 -99 SPO 1997 04 09 06 30 349 7.2 -9 673.10 -45.5 -45.7 -45.6 67 -99 SPO 1997 04 09 06 31 349 7.2 -9 673.10 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 32 350 7.0 -9 673.10 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 33 350 7.5 -9 673.10 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 34 350 7.2 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 35 351 7.2 -9 673.00 -45.5 -45.8 -45.6 66 -99 SPO 1997 04 09 06 36 352 6.9 -9 673.00 -45.5 -45.8 -45.6 66 -99 SPO 1997 04 09 06 37 350 7.0 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 38 350 7.3 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 39 350 7.4 -9 673.00 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 40 350 7.4 -9 673.00 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 41 352 6.9 -9 673.00 -45.6 -45.8 -45.6 69 -99 SPO 1997 04 09 06 42 353 7.6 -9 673.00 -45.5 -45.8 -45.7 68 -99 SPO 1997 04 09 06 43 353 7.4 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 44 353 6.9 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 45 354 7.0 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 46 354 7.0 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 47 354 7.0 -9 673.00 -45.6 -45.8 -45.8 67 -99 SPO 1997 04 09 06 48 355 6.8 -9 673.00 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 49 355 7.1 -9 673.00 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 50 354 7.3 -9 673.00 -45.7 -45.9 -45.8 67 -99 SPO 1997 04 09 06 51 354 7.4 -9 673.00 -45.7 -45.9 -45.8 67 -99 SPO 1997 04 09 06 52 354 7.3 -9 672.90 -45.7 -46.0 -45.8 67 -99 SPO 1997 04 09 06 53 355 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 54 356 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 55 356 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 56 355 7.6 -9 672.90 -45.8 -46.0 -46.0 68 -99 SPO 1997 04 09 06 57 356 7.4 -9 672.90 -45.8 -46.0 -46.0 68 -99 SPO 1997 04 09 06 58 354 7.5 -9 672.90 -45.9 -46.0 -46.0 69 -99 SPO 1997 04 09 06 59 355 7.5 -9 672.90 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 00 355 7.5 -9 672.90 -45.9 -46.0 -46.0 68 0 SPO 1997 04 09 07 01 355 7.5 -9 672.90 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 02 357 7.3 -9 672.80 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 03 357 7.3 -9 672.80 -46.0 -46.0 -46.0 68 -99 SPO 1997 04 09 07 04 357 7.4 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 05 356 7.3 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 06 356 7.1 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 07 356 7.2 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 08 356 7.0 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 09 356 7.0 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 10 356 6.8 -9 672.80 -46.0 -46.0 -46.1 66 -99 SPO 1997 04 09 07 11 355 7.1 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 12 354 6.8 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 13 353 6.8 -9 672.80 -46.0 -46.1 -46.1 67 -99 SPO 1997 04 09 07 14 352 6.6 -9 672.80 -46.0 -46.1 -46.1 67 -99 SPO 1997 04 09 07 15 352 6.7 -9 672.90 -46.0 -46.1 -46.1 66 -99 SPO 1997 04 09 07 16 352 6.6 -9 672.80 -46.0 -46.0 -46.1 66 -99 SPO 1997 04 09 07 17 352 7.1 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 18 352 7.0 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 19 352 7.1 -9 672.80 -46.0 -45.9 -46.1 67 -99 SPO 1997 04 09 07 20 352 7.4 -9 672.80 -46.0 -45.9 -46.1 68 -99 SPO 1997 04 09 07 21 351 7.2 -9 672.80 -46.0 -45.9 -46.1 68 -99 SPO 1997 04 09 07 22 351 7.3 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 23 351 7.2 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 24 351 7.0 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 25 350 6.8 -9 672.80 -46.0 -45.9 -46.0 68 -99 SPO 1997 04 09 07 26 350 7.0 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 27 351 7.0 -9 672.80 -46.0 -45.9 -46.0 67 -99 SPO 1997 04 09 07 28 351 6.7 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 29 351 6.5 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 30 351 6.7 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 31 352 6.5 -9 672.80 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 32 351 6.5 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 33 351 6.5 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 34 350 6.5 -9 672.70 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 35 351 6.6 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 36 350 6.7 -9 672.80 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 07 37 349 6.3 -9 672.80 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 07 38 349 6.5 -9 672.80 -45.9 -45.9 -45.9 67 -99 SPO 1997 04 09 07 39 348 6.2 -9 672.80 -45.9 -45.9 -45.9 67 -99 SPO 1997 04 09 07 40 349 6.4 -9 672.80 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 07 41 349 6.2 -9 672.80 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 07 42 348 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 43 348 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 44 348 6.5 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 45 349 6.6 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 46 349 6.7 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 47 348 6.7 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 48 350 6.6 -9 672.70 -45.8 -45.7 -45.9 68 -99 SPO 1997 04 09 07 49 349 6.8 -9 672.80 -45.8 -45.7 -45.9 68 -99 SPO 1997 04 09 07 50 350 6.5 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 51 350 6.6 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 52 349 6.6 -9 672.70 -45.8 -45.8 -45.8 67 -99 SPO 1997 04 09 07 53 349 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 54 348 6.6 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 55 348 6.7 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 56 348 6.4 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 57 348 6.5 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 58 348 6.1 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 59 347 6.0 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 00 346 5.9 -9 672.80 -45.8 -45.8 -45.9 68 0 SPO 1997 04 09 08 01 347 5.9 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 02 346 6.0 -9 672.80 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 03 346 6.0 -9 672.80 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 04 345 6.0 -9 672.80 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 05 346 6.0 -9 672.80 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 06 345 6.1 -9 672.70 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 07 345 6.1 -9 672.70 -45.7 -45.7 -45.8 66 -99 SPO 1997 04 09 08 08 344 6.2 -9 672.70 -45.7 -45.7 -45.8 66 -99 SPO 1997 04 09 08 09 345 6.2 -9 672.70 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 10 345 6.2 -9 672.70 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 11 344 6.3 -9 672.60 -45.7 -45.7 -45.8 68 -99 SPO 1997 04 09 08 12 345 6.3 -9 672.60 -45.7 -45.7 -45.8 68 -99 SPO 1997 04 09 08 13 345 6.4 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 14 345 6.4 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 15 346 6.4 -9 672.60 -45.7 -45.8 -45.8 68 -99 SPO 1997 04 09 08 16 346 6.6 -9 672.60 -45.7 -45.8 -45.8 68 -99 SPO 1997 04 09 08 17 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 18 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 19 346 6.6 -9 672.60 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 20 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 21 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 22 347 6.5 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 23 347 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 24 347 6.7 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 25 347 6.7 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 26 346 6.8 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 27 346 6.7 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 28 346 6.7 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 29 345 6.9 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 30 346 7.1 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 31 346 6.9 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 32 345 6.9 -9 672.40 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 08 33 345 7.0 -9 672.40 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 08 34 346 7.1 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 35 346 7.2 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 36 346 6.8 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 37 347 7.1 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 38 347 7.4 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 39 347 7.3 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 40 347 7.2 -9 672.40 -45.9 -45.9 -45.9 68 -99 SPO 1997 04 09 08 41 347 7.0 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 42 347 7.3 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 43 346 6.8 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 44 345 6.8 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 45 344 6.8 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 46 345 6.9 -9 672.40 -45.8 -45.8 -46.0 66 -99 SPO 1997 04 09 08 47 345 7.0 -9 672.40 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 08 48 344 6.9 -9 672.40 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 08 49 345 7.0 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 50 344 7.2 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 51 343 6.9 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 52 343 6.6 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 53 343 6.8 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 54 343 6.6 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 55 343 6.6 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 56 343 6.5 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 57 343 6.5 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 58 343 6.6 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 59 343 6.4 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 09 00 343 6.5 -9 672.40 -45.8 -45.8 -45.8 68 0 SPO 1997 04 09 09 01 343 6.7 -9 672.30 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 09 02 343 6.5 -9 672.30 -45.8 -45.7 -45.8 68 -99 SPO 1997 04 09 09 03 343 6.5 -9 672.30 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 09 04 342 6.8 -9 672.30 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 09 05 342 6.8 -9 672.30 -45.7 -45.6 -45.8 67 -99 SPO 1997 04 09 09 06 342 6.8 -9 672.30 -45.7 -45.6 -45.7 68 -99 SPO 1997 04 09 09 07 342 6.7 -9 672.30 -45.6 -45.6 -45.7 68 -99 SPO 1997 04 09 09 08 341 6.8 -9 672.30 -45.6 -45.6 -45.7 67 -99 SPO 1997 04 09 09 09 342 6.9 -9 672.20 -45.6 -45.5 -45.7 66 -99 SPO 1997 04 09 09 10 341 6.8 -9 672.20 -45.6 -45.6 -45.6 66 -99 SPO 1997 04 09 09 11 339 6.7 -9 672.30 -45.5 -45.6 -45.6 66 -99 SPO 1997 04 09 09 12 339 6.7 -9 672.30 -45.5 -45.6 -45.6 67 -99 SPO 1997 04 09 09 13 341 7.0 -9 672.20 -45.5 -45.5 -45.6 68 -99 SPO 1997 04 09 09 14 338 6.9 -9 672.20 -45.5 -45.5 -45.6 68 -99 SPO 1997 04 09 09 15 338 6.9 -9 672.20 -45.5 -45.5 -45.5 68 -99 SPO 1997 04 09 09 16 339 6.9 -9 672.20 -45.4 -45.5 -45.5 67 -99 SPO 1997 04 09 09 17 338 6.9 -9 672.20 -45.4 -45.5 -45.5 68 -99 SPO 1997 04 09 09 18 338 6.8 -9 672.20 -45.4 -45.4 -45.5 68 -99 SPO 1997 04 09 09 19 339 7.0 -9 672.20 -45.4 -45.4 -45.4 68 -99 SPO 1997 04 09 09 20 339 7.0 -9 672.20 -45.4 -45.4 -45.4 68 -99 SPO 1997 04 09 09 21 336 7.1 -9 672.20 -45.3 -45.4 -45.4 67 -99 SPO 1997 04 09 09 22 340 7.0 -9 672.20 -45.3 -45.3 -45.3 67 -99 SPO 1997 04 09 09 23 339 7.1 -9 672.10 -45.3 -45.2 -45.3 67 -99 SPO 1997 04 09 09 24 335 7.0 -9 672.20 -45.2 -45.3 -45.2 66 -99 SPO 1997 04 09 09 25 337 7.1 -9 672.10 -45.2 -45.2 -45.2 67 -99 SPO 1997 04 09 09 26 340 7.2 -9 672.10 -45.2 -45.2 -45.2 68 -99 SPO 1997 04 09 09 27 339 7.4 -9 672.10 -45.1 -45.1 -45.2 67 -99 SPO 1997 04 09 09 28 333 7.0 -9 672.10 -45.1 -45.0 -45.2 68 -99 SPO 1997 04 09 09 29 334 6.9 -9 672.10 -45.1 -45.1 -45.1 68 -99 SPO 1997 04 09 09 30 338 7.2 -9 672.00 -45.0 -44.8 -45.1 68 -99 SPO 1997 04 09 09 31 335 7.0 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 32 335 7.3 -9 672.00 -45.0 -45.1 -45.1 68 -99 SPO 1997 04 09 09 33 331 7.3 -9 672.00 -45.0 -45.1 -45.1 68 -99 SPO 1997 04 09 09 34 338 6.9 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 35 333 7.0 -9 672.00 -45.0 -45.2 -45.1 68 -99 SPO 1997 04 09 09 36 336 7.4 -9 672.00 -45.0 -45.1 -45.1 67 -99 SPO 1997 04 09 09 37 335 7.1 -9 672.00 -45.0 -45.0 -45.1 67 -99 SPO 1997 04 09 09 38 336 7.6 -9 672.00 -45.0 -45.0 -45.0 67 -99 SPO 1997 04 09 09 39 332 6.7 -9 672.00 -45.0 -45.0 -45.1 67 -99 SPO 1997 04 09 09 40 336 6.6 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 41 333 7.0 -9 672.00 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 09 42 334 6.5 -9 672.10 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 09 43 331 6.4 -9 672.10 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 44 335 6.6 -9 672.10 -45.0 -45.0 -45.0 68 -99 SPO 1997 04 09 09 45 334 6.4 -9 672.10 -45.0 -44.9 -45.0 68 -99 SPO 1997 04 09 09 46 332 6.3 -9 672.10 -44.9 -44.9 -45.0 67 -99 SPO 1997 04 09 09 47 333 7.0 -9 672.10 -44.9 -44.9 -45.0 67 -99 SPO 1997 04 09 09 48 330 6.7 -9 672.00 -44.9 -44.8 -44.9 67 -99 SPO 1997 04 09 09 49 334 6.6 -9 672.00 -44.8 -44.8 -44.9 67 -99 SPO 1997 04 09 09 50 333 7.1 -9 672.00 -44.8 -44.8 -44.8 67 -99 SPO 1997 04 09 09 51 334 7.0 -9 672.00 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 09 09 52 334 6.9 -9 672.00 -44.7 -44.8 -44.8 67 -99 SPO 1997 04 09 09 53 335 7.0 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 54 335 7.0 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 55 334 7.1 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 56 335 6.8 -9 672.00 -44.7 -44.7 -44.8 68 -99 SPO 1997 04 09 09 57 335 6.7 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 58 336 6.8 -9 672.00 -44.6 -44.8 -44.7 67 -99 SPO 1997 04 09 09 59 334 6.8 -9 672.00 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 09 10 00 334 6.7 -9 672.00 -44.7 -44.8 -44.7 67 0 SPO 1997 04 09 10 01 334 6.8 -9 672.00 -44.7 -44.8 -44.7 67 -99 SPO 1997 04 09 10 02 335 6.6 -9 672.00 -44.7 -44.7 -44.7 67 -99 SPO 1997 04 09 10 03 334 6.5 -9 672.00 -44.7 -44.7 -44.7 67 -99 SPO 1997 04 09 10 04 334 6.6 -9 672.00 -44.7 -44.7 -44.7 69 -99 SPO 1997 04 09 10 05 335 6.4 -9 672.00 -44.7 -44.7 -44.7 69 -99 SPO 1997 04 09 10 06 334 6.7 -9 672.00 -44.6 -44.7 -44.7 68 -99 SPO 1997 04 09 10 07 334 6.4 -9 672.00 -44.6 -44.7 -44.7 68 -99 SPO 1997 04 09 10 08 334 6.4 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 09 333 6.6 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 10 333 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 11 332 6.5 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 12 334 6.1 -9 672.00 -44.6 -44.6 -44.6 68 -99 SPO 1997 04 09 10 13 332 6.5 -9 672.00 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 09 10 14 332 6.6 -9 672.00 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 09 10 15 330 7.1 -9 672.00 -44.5 -44.5 -44.5 67 -99 SPO 1997 04 09 10 16 333 6.5 -9 672.00 -44.5 -44.5 -44.6 67 -99 SPO 1997 04 09 10 17 332 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 18 334 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 19 332 6.5 -9 672.00 -44.5 -44.4 -44.7 67 -99 SPO 1997 04 09 10 20 335 6.2 -9 672.00 -44.6 -44.5 -44.7 68 -99 SPO 1997 04 09 10 21 331 6.3 -9 671.90 -44.7 -44.6 -44.8 68 -99 SPO 1997 04 09 10 22 335 6.3 -9 671.90 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 23 334 6.5 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 24 335 6.2 -9 671.90 -44.7 -44.5 -44.7 68 -99 SPO 1997 04 09 10 25 334 6.4 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 26 332 6.3 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 27 335 6.3 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 28 336 6.0 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 29 335 5.8 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 30 336 6.2 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 31 338 6.2 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 32 337 6.2 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 33 339 6.1 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 34 338 6.0 -9 672.00 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 35 338 5.8 -9 672.00 -44.7 -44.5 -44.8 67 -99 SPO 1997 04 09 10 36 336 5.5 -9 672.00 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 37 339 5.5 -9 672.00 -44.7 -44.5 -44.8 69 -99 SPO 1997 04 09 10 38 337 5.3 -9 672.00 -44.7 -44.6 -44.8 69 -99 SPO 1997 04 09 10 39 340 5.3 -9 672.00 -44.7 -44.6 -44.8 68 -99 SPO 1997 04 09 10 40 339 5.2 -9 672.00 -44.8 -44.6 -44.9 68 -99 SPO 1997 04 09 10 41 339 5.2 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 42 340 5.3 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 43 340 5.5 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 44 341 5.4 -9 672.00 -44.9 -44.5 -44.9 68 -99 SPO 1997 04 09 10 45 341 5.5 -9 672.00 -44.9 -44.5 -45.0 68 -99 SPO 1997 04 09 10 46 341 5.7 -9 672.00 -44.9 -44.5 -45.0 68 -99 SPO 1997 04 09 10 47 340 5.9 -9 672.00 -44.9 -44.4 -45.0 68 -99 SPO 1997 04 09 10 48 340 6.1 -9 671.90 -44.9 -44.4 -44.9 68 -99 SPO 1997 04 09 10 49 339 6.1 -9 671.90 -44.9 -44.3 -44.9 68 -99 SPO 1997 04 09 10 50 340 6.0 -9 671.90 -44.8 -44.3 -44.9 67 -99 SPO 1997 04 09 10 51 340 6.1 -9 671.90 -44.8 -44.2 -44.8 68 -99 SPO 1997 04 09 10 52 340 6.1 -9 671.90 -44.8 -44.2 -44.8 67 -99 SPO 1997 04 09 10 53 340 6.1 -9 671.90 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 10 54 341 6.0 -9 671.90 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 10 55 341 5.9 -9 672.00 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 10 56 341 5.5 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 57 339 5.4 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 58 340 4.9 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 59 342 5.1 -9 672.00 -44.8 -44.5 -45.0 68 -99 SPO 1997 04 09 11 00 342 5.0 -9 672.00 -45.0 -44.5 -45.1 70 0 SPO 1997 04 09 11 01 341 5.0 -9 672.00 -45.0 -44.5 -45.1 69 -99 SPO 1997 04 09 11 02 341 5.2 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 03 341 5.0 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 04 342 4.8 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 05 343 4.8 -9 672.00 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 11 06 340 5.0 -9 672.00 -45.2 -44.4 -45.2 67 -99 SPO 1997 04 09 11 07 339 5.6 -9 672.00 -45.1 -44.4 -45.2 66 -99 SPO 1997 04 09 11 08 338 6.1 -9 672.00 -45.0 -44.3 -45.1 65 -99 SPO 1997 04 09 11 09 342 6.0 -9 672.00 -45.0 -44.2 -45.0 66 -99 SPO 1997 04 09 11 10 339 5.6 -9 672.00 -45.0 -44.2 -45.2 67 -99 SPO 1997 04 09 11 11 339 5.6 -9 672.00 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 11 12 335 5.8 -9 672.00 -45.1 -44.3 -45.1 66 -99 SPO 1997 04 09 11 13 341 6.0 -9 672.00 -45.0 -44.2 -45.0 67 -99 SPO 1997 04 09 11 14 341 6.3 -9 672.00 -45.0 -44.1 -45.0 67 -99 SPO 1997 04 09 11 15 338 5.5 -9 672.00 -45.0 -44.2 -45.0 68 -99 SPO 1997 04 09 11 16 340 5.4 -9 672.00 -45.0 -44.4 -45.1 68 -99 SPO 1997 04 09 11 17 339 5.8 -9 672.00 -45.1 -44.3 -45.2 69 -99 SPO 1997 04 09 11 18 339 5.7 -9 672.00 -45.2 -44.3 -45.3 68 -99 SPO 1997 04 09 11 19 339 5.7 -9 672.00 -45.2 -44.2 -45.3 67 -99 SPO 1997 04 09 11 20 336 5.6 -9 672.00 -45.2 -44.2 -45.3 66 -99 SPO 1997 04 09 11 21 336 5.6 -9 672.00 -45.2 -44.2 -45.2 66 -99 SPO 1997 04 09 11 22 335 5.8 -9 672.00 -45.2 -44.1 -45.2 66 -99 SPO 1997 04 09 11 23 336 5.6 -9 672.00 -45.2 -44.1 -45.2 67 -99 SPO 1997 04 09 11 24 337 5.6 -9 672.00 -45.2 -44.1 -45.3 67 -99 SPO 1997 04 09 11 25 341 5.5 -9 672.00 -45.2 -44.2 -45.2 67 -99 SPO 1997 04 09 11 26 348 5.6 -9 672.00 -45.3 -44.2 -45.4 67 -99 SPO 1997 04 09 11 27 349 5.0 -9 672.00 -45.4 -44.1 -45.6 67 -99 SPO 1997 04 09 11 28 348 4.6 -9 672.00 -45.6 -44.4 -45.8 68 -99 SPO 1997 04 09 11 29 350 4.7 -9 672.00 -45.8 -44.5 -46.0 68 -99 SPO 1997 04 09 11 30 351 5.1 -9 672.00 -45.9 -44.4 -46.1 69 -99 SPO 1997 04 09 11 31 350 5.3 -9 672.00 -45.9 -44.3 -46.1 67 -99 SPO 1997 04 09 11 32 349 5.2 -9 672.00 -46.0 -44.3 -46.1 66 -99 SPO 1997 04 09 11 33 348 5.5 -9 672.00 -46.0 -44.3 -46.1 66 -99 SPO 1997 04 09 11 34 348 5.9 -9 672.00 -46.0 -44.4 -46.1 66 -99 SPO 1997 04 09 11 35 348 5.9 -9 672.00 -46.0 -44.4 -46.0 66 -99 SPO 1997 04 09 11 36 348 5.9 -9 672.00 -46.0 -44.4 -46.0 66 -99 SPO 1997 04 09 11 37 349 5.7 -9 672.00 -45.9 -44.4 -45.9 66 -99 SPO 1997 04 09 11 38 349 5.6 -9 672.00 -45.9 -44.4 -46.0 67 -99 SPO 1997 04 09 11 39 350 5.6 -9 672.00 -45.9 -44.4 -45.9 67 -99 SPO 1997 04 09 11 40 349 5.7 -9 672.00 -45.9 -44.4 -45.9 67 -99 SPO 1997 04 09 11 41 348 6.0 -9 672.00 -45.9 -44.4 -45.8 67 -99 SPO 1997 04 09 11 42 346 6.1 -9 672.00 -45.8 -44.3 -45.8 68 -99 SPO 1997 04 09 11 43 345 6.2 -9 672.00 -45.8 -44.3 -45.7 68 -99 SPO 1997 04 09 11 44 345 6.5 -9 672.00 -45.7 -44.3 -45.7 67 -99 SPO 1997 04 09 11 45 345 6.6 -9 671.90 -45.6 -44.2 -45.6 67 -99 SPO 1997 04 09 11 46 343 6.7 -9 671.90 -45.6 -44.3 -45.6 67 -99 SPO 1997 04 09 11 47 343 6.9 -9 671.90 -45.6 -44.2 -45.6 67 -99 SPO 1997 04 09 11 48 344 6.8 -9 671.90 -45.5 -44.2 -45.5 66 -99 SPO 1997 04 09 11 49 345 6.7 -9 671.90 -45.5 -44.2 -45.5 67 -99 SPO 1997 04 09 11 50 345 6.8 -9 671.90 -45.5 -44.3 -45.5 67 -99 SPO 1997 04 09 11 51 344 6.7 -9 671.90 -45.4 -44.3 -45.5 67 -99 SPO 1997 04 09 11 52 344 6.7 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 53 344 6.7 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 54 343 6.5 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 55 342 6.7 -9 671.90 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 11 56 342 6.7 -9 671.90 -45.3 -44.4 -45.4 68 -99 SPO 1997 04 09 11 57 342 6.8 -9 671.90 -45.3 -44.4 -45.4 68 -99 SPO 1997 04 09 11 58 341 6.7 -9 671.90 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 11 59 343 6.7 -9 671.90 -45.4 -44.4 -45.4 67 -99 SPO 1997 04 09 12 00 344 6.5 -9 671.90 -45.4 -44.4 -45.5 67 0 SPO 1997 04 09 12 01 344 6.6 -9 671.90 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 02 345 6.6 -9 671.90 -45.5 -44.4 -45.5 68 -99 SPO 1997 04 09 12 03 346 6.7 -9 671.90 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 04 347 6.7 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 05 347 6.9 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 06 348 6.9 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 07 347 7.0 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 08 347 7.1 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 09 347 7.1 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 10 347 7.1 -9 671.80 -45.5 -44.4 -45.5 68 -99 SPO 1997 04 09 12 11 347 6.9 -9 671.80 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 12 347 6.9 -9 671.80 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 13 348 6.8 -9 671.80 -45.4 -44.4 -45.5 65 -99 SPO 1997 04 09 12 14 347 6.8 -9 671.80 -45.4 -44.4 -45.5 65 -99 SPO 1997 04 09 12 15 347 6.7 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 16 346 6.7 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 17 346 6.6 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 18 346 6.5 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 19 346 6.4 -9 671.80 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 12 20 346 6.4 -9 671.80 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 12 21 346 6.3 -9 671.80 -45.4 -44.6 -45.5 68 -99 SPO 1997 04 09 12 22 347 6.3 -9 671.80 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 23 347 6.4 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 24 347 6.4 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 25 346 6.5 -9 671.80 -45.4 -44.5 -45.4 66 -99 SPO 1997 04 09 12 26 346 6.4 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 27 346 6.5 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 28 345 6.5 -9 671.80 -45.4 -44.5 -45.4 66 -99 SPO 1997 04 09 12 29 344 6.5 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 30 343 6.5 -9 671.80 -45.4 -44.5 -45.4 67 -99 SPO 1997 04 09 12 31 343 6.5 -9 671.70 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 32 341 6.5 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 33 342 6.5 -9 671.70 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 12 34 341 6.6 -9 671.70 -45.3 -44.4 -45.3 67 -99 SPO 1997 04 09 12 35 340 6.7 -9 671.70 -45.3 -44.5 -45.3 67 -99 SPO 1997 04 09 12 36 339 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 37 339 6.8 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 38 338 6.8 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 39 338 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 40 338 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 41 337 6.5 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 42 337 6.3 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 43 337 6.3 -9 671.70 -45.3 -44.5 -45.4 68 -99 SPO 1997 04 09 12 44 337 6.2 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 45 338 6.3 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 46 339 6.3 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 47 340 6.3 -9 671.60 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 48 341 6.4 -9 671.60 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 49 341 6.2 -9 671.60 -45.4 -44.5 -45.4 69 -99 SPO 1997 04 09 12 50 340 6.3 -9 671.70 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 51 339 6.4 -9 671.70 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 52 339 6.4 -9 671.70 -45.4 -44.4 -45.5 67 -99 SPO 1997 04 09 12 53 338 6.2 -9 671.70 -45.5 -44.3 -45.6 67 -99 SPO 1997 04 09 12 54 338 6.1 -9 671.70 -45.5 -44.3 -45.5 66 -99 SPO 1997 04 09 12 55 337 6.2 -9 671.70 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 56 338 5.9 -9 671.70 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 57 339 5.7 -9 671.70 -45.5 -44.5 -45.6 68 -99 SPO 1997 04 09 12 58 341 5.8 -9 671.70 -45.5 -44.6 -45.7 68 -99 SPO 1997 04 09 12 59 342 5.8 -9 671.70 -45.6 -44.6 -45.8 68 -99 SPO 1997 04 09 13 00 342 5.8 -9 671.60 -45.7 -44.6 -45.8 69 0 SPO 1997 04 09 13 01 343 6.0 -9 671.60 -45.7 -44.6 -45.9 67 -99 SPO 1997 04 09 13 02 343 6.0 -9 671.60 -45.8 -44.6 -45.9 68 -99 SPO 1997 04 09 13 03 344 6.0 -9 671.60 -45.8 -44.5 -45.9 66 -99 SPO 1997 04 09 13 04 344 6.0 -9 671.60 -45.9 -44.6 -45.9 66 -99 SPO 1997 04 09 13 05 343 6.2 -9 671.60 -45.9 -44.5 -45.9 66 -99 SPO 1997 04 09 13 06 343 6.2 -9 671.60 -45.9 -44.4 -45.9 66 -99 SPO 1997 04 09 13 07 343 6.3 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 08 342 6.4 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 09 342 6.2 -9 671.60 -45.9 -44.3 -45.9 68 -99 SPO 1997 04 09 13 10 342 6.1 -9 671.60 -45.8 -44.3 -45.9 68 -99 SPO 1997 04 09 13 11 342 6.2 -9 671.60 -45.8 -44.3 -45.9 68 -99 SPO 1997 04 09 13 12 342 6.2 -9 671.60 -45.9 -44.2 -45.9 69 -99 SPO 1997 04 09 13 13 340 6.3 -9 671.60 -45.9 -44.2 -45.9 68 -99 SPO 1997 04 09 13 14 340 6.4 -9 671.60 -45.8 -44.2 -45.8 66 -99 SPO 1997 04 09 13 15 340 6.4 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 16 341 6.3 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 17 342 6.3 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 18 341 6.3 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 19 342 6.1 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 20 343 6.0 -9 671.60 -45.8 -44.3 -45.9 67 -99 SPO 1997 04 09 13 21 343 6.0 -9 671.60 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 13 22 343 6.1 -9 671.60 -45.9 -44.4 -45.9 68 -99 SPO 1997 04 09 13 23 343 6.2 -9 671.60 -45.9 -44.3 -45.9 69 -99 SPO 1997 04 09 13 24 342 6.4 -9 671.60 -45.9 -44.3 -45.9 68 -99 SPO 1997 04 09 13 25 342 6.3 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 26 343 6.2 -9 671.60 -45.8 -44.3 -45.8 66 -99 SPO 1997 04 09 13 27 343 6.2 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 28 345 6.2 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 29 344 6.2 -9 671.50 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 30 344 5.9 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 31 343 5.4 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 32 347 5.5 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 33 351 5.8 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 34 348 5.7 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 35 347 5.7 -9 671.60 -45.8 -44.3 -45.9 67 -99 SPO 1997 04 09 13 36 347 6.0 -9 671.60 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 13 37 346 6.1 -9 671.60 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 13 38 346 5.9 -9 671.60 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 13 39 345 5.7 -9 671.60 -45.7 -44.4 -45.7 67 -99 SPO 1997 04 09 13 40 347 5.8 -9 671.60 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 41 351 6.1 -9 671.60 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 42 349 5.9 -9 671.60 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 43 348 6.0 -9 671.60 -45.7 -44.4 -45.8 67 -99 SPO 1997 04 09 13 44 350 6.0 -9 671.60 -45.7 -44.4 -45.7 66 -99 SPO 1997 04 09 13 45 350 5.9 -9 671.60 -45.7 -44.4 -45.7 66 -99 SPO 1997 04 09 13 46 351 6.0 -9 671.60 -45.7 -44.4 -45.7 67 -99 SPO 1997 04 09 13 47 352 5.9 -9 671.50 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 48 353 6.0 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 49 355 5.9 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 50 357 6.0 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 51 357 5.9 -9 671.50 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 52 356 6.2 -9 671.50 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 53 355 6.2 -9 671.50 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 54 355 6.2 -9 671.50 -45.7 -44.3 -45.7 68 -99 SPO 1997 04 09 13 55 356 6.1 -9 671.50 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 13 56 357 6.1 -9 671.50 -45.6 -44.4 -45.7 66 -99 SPO 1997 04 09 13 57 358 6.1 -9 671.50 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 13 58 357 6.1 -9 671.50 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 13 59 357 6.2 -9 671.50 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 14 00 357 6.2 -9 671.50 -45.8 -44.5 -45.9 68 0 SPO 1997 04 09 14 01 357 6.4 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 02 355 6.4 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 03 354 6.5 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 04 353 6.5 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 05 352 6.7 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 06 352 6.9 -9 671.40 -45.8 -44.4 -45.8 69 -99 SPO 1997 04 09 14 07 352 6.9 -9 671.40 -45.8 -44.3 -45.8 69 -99 SPO 1997 04 09 14 08 353 6.8 -9 671.40 -45.7 -44.3 -45.8 68 -99 SPO 1997 04 09 14 09 355 6.9 -9 671.40 -45.7 -44.3 -45.8 67 -99 SPO 1997 04 09 14 10 356 6.8 -9 671.40 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 14 11 356 6.7 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 12 358 6.7 -9 671.40 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 14 13 358 6.8 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 14 358 6.8 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 15 357 6.6 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 16 357 6.7 -9 671.40 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 14 17 356 6.8 -9 671.40 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 14 18 357 6.8 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 19 359 7.2 -9 671.40 -45.8 -44.3 -45.8 68 -99 SPO 1997 04 09 14 20 357 6.8 -9 671.40 -45.7 -44.3 -45.8 68 -99 SPO 1997 04 09 14 21 357 6.7 -9 671.40 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 14 22 358 6.8 -9 671.40 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 14 23 358 6.7 -9 671.40 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 14 24 358 6.6 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 25 358 6.8 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 26 359 7.1 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 27 360 7.2 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 28 359 7.0 -9 671.40 -45.7 -44.5 -45.8 66 -99 SPO 1997 04 09 14 29 0 7.0 -9 671.40 -45.8 -44.5 -45.8 67 -99 SPO 1997 04 09 14 30 360 6.8 -9 671.40 -45.8 -44.5 -45.8 68 -99 SPO 1997 04 09 14 31 359 6.8 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 32 359 6.9 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 33 359 7.2 -9 671.30 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 34 358 7.1 -9 671.30 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 35 357 7.0 -9 671.30 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 14 36 357 7.0 -9 671.30 -45.8 -44.6 -46.0 66 -99 SPO 1997 04 09 14 37 357 7.1 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 38 357 7.2 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 39 356 7.2 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 40 358 7.6 -9 671.30 -46.0 -44.6 -46.0 68 -99 SPO 1997 04 09 14 41 357 7.6 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 42 356 7.4 -9 671.30 -45.9 -44.6 -46.0 68 -99 SPO 1997 04 09 14 43 356 7.6 -9 671.30 -46.0 -44.6 -46.0 69 -99 SPO 1997 04 09 14 44 356 7.5 -9 671.30 -45.9 -44.6 -46.0 68 -99 SPO 1997 04 09 14 45 356 7.6 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 46 356 7.2 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 47 357 7.1 -9 671.30 -45.9 -44.7 -46.0 67 -99 SPO 1997 04 09 14 48 357 7.1 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 49 357 7.2 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 50 357 7.0 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 51 357 7.1 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 52 357 7.0 -9 671.30 -45.9 -44.5 -46.0 66 -99 SPO 1997 04 09 14 53 357 7.2 -9 671.30 -45.9 -44.5 -46.0 67 -99 SPO 1997 04 09 14 54 356 7.3 -9 671.20 -45.9 -44.5 -46.0 66 -99 SPO 1997 04 09 14 55 354 7.1 -9 671.20 -45.9 -44.5 -46.0 67 -99 SPO 1997 04 09 14 56 354 7.1 -9 671.30 -45.9 -44.6 -45.9 67 -99 SPO 1997 04 09 14 57 354 7.1 -9 671.20 -45.9 -44.7 -45.9 68 -99 SPO 1997 04 09 14 58 354 7.0 -9 671.30 -45.9 -44.7 -46.0 68 -99 SPO 1997 04 09 14 59 354 6.9 -9 671.20 -45.9 -44.8 -46.0 68 -99 SPO 1997 04 09 15 00 355 6.9 -9 671.20 -45.9 -44.8 -46.0 68 0 SPO 1997 04 09 15 01 354 6.9 -9 671.30 -45.9 -44.8 -46.0 67 -99 SPO 1997 04 09 15 02 355 6.9 -9 671.30 -45.9 -44.9 -46.1 67 -99 SPO 1997 04 09 15 03 355 6.9 -9 671.20 -46.0 -44.8 -46.1 67 -99 SPO 1997 04 09 15 04 355 7.0 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 05 355 6.8 -9 671.20 -46.0 -44.9 -46.1 68 -99 SPO 1997 04 09 15 06 354 6.9 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 07 354 6.7 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 08 354 6.9 -9 671.20 -46.1 -44.8 -46.2 67 -99 SPO 1997 04 09 15 09 354 6.7 -9 671.20 -46.1 -44.7 -46.2 67 -99 SPO 1997 04 09 15 10 354 6.9 -9 671.20 -46.1 -44.6 -46.2 67 -99 SPO 1997 04 09 15 11 354 7.1 -9 671.20 -46.1 -44.6 -46.2 68 -99 SPO 1997 04 09 15 12 355 7.0 -9 671.20 -46.1 -44.6 -46.2 67 -99 SPO 1997 04 09 15 13 355 6.9 -9 671.20 -46.2 -44.6 -46.2 68 -99 SPO 1997 04 09 15 14 355 6.8 -9 671.20 -46.2 -44.7 -46.3 66 -99 SPO 1997 04 09 15 15 355 6.8 -9 671.20 -46.2 -44.7 -46.3 65 -99 SPO 1997 04 09 15 16 354 6.8 -9 671.20 -46.2 -44.7 -46.4 65 -99 SPO 1997 04 09 15 17 353 6.8 -9 671.20 -46.3 -44.8 -46.4 65 -99 SPO 1997 04 09 15 18 353 6.8 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 19 353 6.9 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 20 353 6.8 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 21 353 6.6 -9 671.20 -46.4 -44.8 -46.4 68 -99 SPO 1997 04 09 15 22 354 6.4 -9 671.20 -46.4 -44.9 -46.4 68 -99 SPO 1997 04 09 15 23 354 6.4 -9 671.20 -46.4 -44.9 -46.5 68 -99 SPO 1997 04 09 15 24 354 6.3 -9 671.20 -46.4 -45.0 -46.5 68 -99 SPO 1997 04 09 15 25 355 6.5 -9 671.20 -46.4 -45.0 -46.5 68 -99 SPO 1997 04 09 15 26 356 6.5 -9 671.10 -46.4 -45.0 -46.5 66 -99 SPO 1997 04 09 15 27 356 6.4 -9 671.10 -46.4 -45.0 -46.5 65 -99 SPO 1997 04 09 15 28 356 6.5 -9 671.10 -46.5 -45.0 -46.6 65 -99 SPO 1997 04 09 15 29 356 6.4 -9 671.10 -46.5 -45.1 -46.6 64 -99 SPO 1997 04 09 15 30 354 6.3 -9 671.10 -46.5 -45.1 -46.6 65 -99 SPO 1997 04 09 15 31 354 6.4 -9 671.10 -46.6 -45.1 -46.6 65 -99 SPO 1997 04 09 15 32 354 6.6 -9 671.10 -46.6 -45.1 -46.7 65 -99 SPO 1997 04 09 15 33 354 6.6 -9 671.10 -46.6 -45.0 -46.7 65 -99 SPO 1997 04 09 15 34 356 7.0 -9 671.10 -46.6 -45.0 -46.6 65 -99 SPO 1997 04 09 15 35 353 6.7 -9 671.10 -46.6 -45.0 -46.6 65 -99 SPO 1997 04 09 15 36 354 6.8 -9 671.10 -46.6 -45.2 -46.6 65 -99 SPO 1997 04 09 15 37 355 7.2 -9 671.10 -46.5 -45.2 -46.6 65 -99 SPO 1997 04 09 15 38 355 7.1 -9 671.10 -46.5 -45.1 -46.6 66 -99 SPO 1997 04 09 15 39 354 6.9 -9 671.10 -46.5 -45.2 -46.6 65 -99 SPO 1997 04 09 15 40 354 6.5 -9 671.10 -46.6 -45.3 -46.6 65 -99 SPO 1997 04 09 15 41 352 6.3 -9 671.10 -46.6 -45.3 -46.7 65 -99 SPO 1997 04 09 15 42 352 6.3 -9 671.10 -46.6 -45.4 -46.7 65 -99 SPO 1997 04 09 15 43 353 6.3 -9 671.10 -46.6 -45.5 -46.7 65 -99 SPO 1997 04 09 15 44 353 6.0 -9 671.10 -46.7 -45.5 -46.7 66 -99 SPO 1997 04 09 15 45 352 6.0 -9 671.10 -46.7 -45.5 -46.8 65 -99 SPO 1997 04 09 15 46 353 6.3 -9 671.10 -46.7 -45.5 -46.7 65 -99 SPO 1997 04 09 15 47 354 6.4 -9 671.10 -46.7 -45.5 -46.8 66 -99 SPO 1997 04 09 15 48 356 6.2 -9 671.10 -46.7 -45.5 -46.8 66 -99 SPO 1997 04 09 15 49 357 6.2 -9 671.10 -46.7 -45.6 -46.8 66 -99 SPO 1997 04 09 15 50 357 6.2 -9 671.10 -46.8 -45.6 -46.8 66 -99 SPO 1997 04 09 15 51 357 6.2 -9 671.10 -46.8 -45.7 -46.9 66 -99 SPO 1997 04 09 15 52 357 6.3 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 53 357 6.5 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 54 356 6.3 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 55 358 6.5 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 56 358 6.8 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 57 358 6.9 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 58 357 7.0 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 59 356 6.9 -9 671.10 -46.8 -45.7 -46.9 66 -99 SPO 1997 04 09 16 00 355 6.7 -9 671.10 -46.8 -45.7 -46.9 66 0 SPO 1997 04 09 16 01 354 6.4 -9 671.10 -46.8 -45.8 -46.9 66 -99 SPO 1997 04 09 16 02 355 6.4 -9 671.10 -46.9 -45.9 -47.0 67 -99 SPO 1997 04 09 16 03 355 6.4 -9 671.10 -46.9 -45.9 -47.0 67 -99 SPO 1997 04 09 16 04 357 6.9 -9 671.10 -46.9 -45.9 -47.0 66 -99 SPO 1997 04 09 16 05 359 7.1 -9 671.00 -46.9 -45.8 -47.0 65 -99 SPO 1997 04 09 16 06 359 7.2 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 07 358 7.1 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 08 357 7.0 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 09 355 7.1 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 10 355 7.0 -9 671.00 -46.9 -45.6 -47.0 66 -99 SPO 1997 04 09 16 11 355 6.8 -9 671.00 -46.9 -45.7 -47.0 66 -99 SPO 1997 04 09 16 12 355 7.0 -9 671.00 -46.9 -45.7 -46.9 66 -99 SPO 1997 04 09 16 13 355 6.9 -9 671.00 -46.9 -45.7 -46.9 66 -99 SPO 1997 04 09 16 14 355 7.1 -9 671.00 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 16 15 355 7.1 -9 670.90 -46.8 -45.7 -46.8 65 -99 SPO 1997 04 09 16 16 355 7.3 -9 670.90 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 16 17 355 7.4 -9 670.90 -46.8 -45.6 -46.9 65 -99 SPO 1997 04 09 16 18 355 7.5 -9 670.90 -46.8 -45.6 -46.9 65 -99 SPO 1997 04 09 16 19 355 7.5 -9 670.90 -46.8 -45.5 -46.9 65 -99 SPO 1997 04 09 16 20 356 7.2 -9 670.90 -46.9 -45.5 -47.0 65 -99 SPO 1997 04 09 16 21 357 7.2 -9 670.90 -46.9 -45.6 -47.0 65 -99 SPO 1997 04 09 16 22 358 7.0 -9 670.90 -46.9 -45.6 -47.0 65 -99 SPO 1997 04 09 16 23 358 6.8 -9 670.90 -47.0 -45.7 -47.1 66 -99 SPO 1997 04 09 16 24 359 6.9 -9 670.90 -47.0 -45.8 -47.1 66 -99 SPO 1997 04 09 16 25 359 6.8 -9 670.90 -47.1 -45.8 -47.2 66 -99 SPO 1997 04 09 16 26 359 6.7 -9 670.90 -47.1 -45.8 -47.2 66 -99 SPO 1997 04 09 16 27 359 6.8 -9 670.90 -47.1 -45.8 -47.3 66 -99 SPO 1997 04 09 16 28 358 6.6 -9 670.90 -47.2 -45.8 -47.3 66 -99 SPO 1997 04 09 16 29 358 6.6 -9 670.90 -47.2 -45.8 -47.3 66 -99 SPO 1997 04 09 16 30 359 6.7 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 31 0 6.6 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 32 0 6.8 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 33 1 6.7 -9 670.90 -47.2 -45.8 -47.3 65 -99 SPO 1997 04 09 16 34 360 6.8 -9 670.90 -47.2 -45.8 -47.3 65 -99 SPO 1997 04 09 16 35 358 6.9 -9 670.80 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 36 358 7.0 -9 670.80 -47.1 -45.8 -47.2 65 -99 SPO 1997 04 09 16 37 358 7.1 -9 670.80 -47.1 -45.8 -47.1 66 -99 SPO 1997 04 09 16 38 358 7.0 -9 670.80 -47.1 -45.9 -47.1 66 -99 SPO 1997 04 09 16 39 358 6.9 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 40 358 6.9 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 41 359 7.0 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 42 358 6.9 -9 670.80 -47.1 -46.1 -47.1 66 -99 SPO 1997 04 09 16 43 358 7.0 -9 670.80 -47.1 -46.1 -47.1 66 -99 SPO 1997 04 09 16 44 358 7.4 -9 670.80 -47.0 -46.1 -47.0 65 -99 SPO 1997 04 09 16 45 358 7.3 -9 670.80 -47.0 -46.0 -47.0 65 -99 SPO 1997 04 09 16 46 359 7.3 -9 670.80 -46.9 -46.0 -46.9 65 -99 SPO 1997 04 09 16 47 359 7.3 -9 670.80 -46.8 -46.0 -46.9 65 -99 SPO 1997 04 09 16 48 358 7.3 -9 670.80 -46.8 -46.0 -46.9 66 -99 SPO 1997 04 09 16 49 357 7.4 -9 670.80 -46.8 -45.9 -46.8 66 -99 SPO 1997 04 09 16 50 356 7.2 -9 670.80 -46.8 -46.0 -46.8 66 -99 SPO 1997 04 09 16 51 355 7.1 -9 670.80 -46.8 -45.9 -46.8 66 -99 SPO 1997 04 09 16 52 355 7.3 -9 670.80 -46.7 -45.9 -46.8 66 -99 SPO 1997 04 09 16 53 355 7.1 -9 670.80 -46.7 -45.9 -46.7 65 -99 SPO 1997 04 09 16 54 355 7.2 -9 670.80 -46.7 -45.9 -46.7 65 -99 SPO 1997 04 09 16 55 355 6.9 -9 670.80 -46.6 -46.0 -46.6 65 -99 SPO 1997 04 09 16 56 356 7.0 -9 670.80 -46.6 -46.1 -46.6 65 -99 SPO 1997 04 09 16 57 355 6.9 -9 670.80 -46.5 -46.1 -46.6 65 -99 SPO 1997 04 09 16 58 356 6.6 -9 670.80 -46.5 -46.2 -46.6 65 -99 SPO 1997 04 09 16 59 356 6.6 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 00 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 0 SPO 1997 04 09 17 01 356 6.8 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 02 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 03 355 6.6 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 04 354 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 05 354 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 06 353 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 07 355 6.5 -9 670.80 -46.5 -46.2 -46.7 66 -99 SPO 1997 04 09 17 08 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 09 357 6.6 -9 670.80 -46.5 -46.2 -46.6 65 -99 SPO 1997 04 09 17 10 359 6.6 -9 670.80 -46.5 -46.3 -46.6 65 -99 SPO 1997 04 09 17 11 1 6.6 -9 670.80 -46.5 -46.3 -46.6 65 -99 SPO 1997 04 09 17 12 3 6.5 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 13 2 6.3 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 14 1 6.3 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 15 359 6.4 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 16 356 6.3 -9 670.80 -46.5 -46.4 -46.6 66 -99 SPO 1997 04 09 17 17 355 6.8 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 18 355 6.8 -9 670.80 -46.5 -46.3 -46.5 66 -99 SPO 1997 04 09 17 19 355 7.3 -9 670.80 -46.5 -46.3 -46.5 66 -99 SPO 1997 04 09 17 20 354 7.2 -9 670.80 -46.4 -46.3 -46.5 65 -99 SPO 1997 04 09 17 21 354 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 22 355 7.5 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 23 355 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 24 353 7.0 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 25 354 7.2 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 26 354 7.4 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 27 354 7.5 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 28 354 7.2 -9 670.80 -46.4 -46.4 -46.6 66 -99 SPO 1997 04 09 17 29 355 7.5 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 30 355 7.5 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 31 356 7.4 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 32 355 7.3 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 33 354 7.8 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 34 353 7.5 -9 670.70 -46.4 -46.3 -46.5 65 -99 SPO 1997 04 09 17 35 353 7.4 -9 670.80 -46.4 -46.4 -46.5 64 -99 SPO 1997 04 09 17 36 355 7.2 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 37 357 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 38 357 7.6 -9 670.80 -46.4 -46.5 -46.6 66 -99 SPO 1997 04 09 17 39 358 7.4 -9 670.80 -46.5 -46.5 -46.6 67 -99 SPO 1997 04 09 17 40 358 7.3 -9 670.80 -46.5 -46.5 -46.6 67 -99 SPO 1997 04 09 17 41 357 7.1 -9 670.70 -46.5 -46.5 -46.7 67 -99 SPO 1997 04 09 17 42 357 7.0 -9 670.70 -46.6 -46.5 -46.7 67 -99 SPO 1997 04 09 17 43 356 6.9 -9 670.70 -46.6 -46.5 -46.7 67 -99 SPO 1997 04 09 17 44 357 7.0 -9 670.70 -46.6 -46.5 -46.7 66 -99 SPO 1997 04 09 17 45 360 7.0 -9 670.70 -46.6 -46.6 -46.7 66 -99 SPO 1997 04 09 17 46 0 6.9 -9 670.80 -46.6 -46.6 -46.8 65 -99 SPO 1997 04 09 17 47 0 7.0 -9 670.80 -46.7 -46.6 -46.8 65 -99 SPO 1997 04 09 17 48 359 6.8 -9 670.80 -46.7 -46.7 -46.9 65 -99 SPO 1997 04 09 17 49 358 6.8 -9 670.70 -46.7 -46.7 -46.9 64 -99 SPO 1997 04 09 17 50 355 6.8 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 51 354 7.0 -9 670.70 -46.8 -46.7 -46.9 66 -99 SPO 1997 04 09 17 52 352 6.9 -9 670.70 -46.8 -46.6 -46.9 66 -99 SPO 1997 04 09 17 53 352 7.4 -9 670.70 -46.8 -46.6 -46.9 66 -99 SPO 1997 04 09 17 54 354 7.6 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 55 354 7.7 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 56 354 8.0 -9 670.70 -46.8 -46.8 -46.9 66 -99 SPO 1997 04 09 17 57 354 7.9 -9 670.70 -46.8 -46.8 -46.9 66 -99 SPO 1997 04 09 17 58 354 7.8 -9 670.70 -46.8 -46.8 -46.9 65 -99 SPO 1997 04 09 17 59 354 7.9 -9 670.70 -46.8 -46.8 -47.0 65 -99 SPO 1997 04 09 18 00 354 7.8 -9 670.60 -46.9 -46.9 -47.0 65 0 SPO 1997 04 09 18 01 353 8.4 -9 670.60 -46.9 -46.9 -47.0 65 -99 SPO 1997 04 09 18 02 353 8.0 -9 670.60 -46.9 -46.9 -47.0 65 -99 SPO 1997 04 09 18 03 353 8.0 -9 670.60 -46.9 -46.8 -47.0 66 -99 SPO 1997 04 09 18 04 354 7.8 -9 670.60 -46.9 -46.8 -47.0 67 -99 SPO 1997 04 09 18 05 355 7.7 -9 670.60 -46.9 -46.9 -47.0 67 -99 SPO 1997 04 09 18 06 355 7.9 -9 670.60 -46.9 -46.9 -47.1 66 -99 SPO 1997 04 09 18 07 356 7.9 -9 670.70 -47.0 -46.9 -47.1 67 -99 SPO 1997 04 09 18 08 356 7.7 -9 670.70 -47.0 -46.9 -47.1 67 -99 SPO 1997 04 09 18 09 356 7.9 -9 670.70 -47.0 -46.9 -47.1 66 -99 SPO 1997 04 09 18 10 356 7.5 -9 670.70 -47.0 -46.9 -47.1 65 -99 SPO 1997 04 09 18 11 357 7.4 -9 670.70 -47.0 -46.9 -47.1 65 -99 SPO 1997 04 09 18 12 358 7.3 -9 670.70 -47.0 -47.0 -47.1 65 -99 SPO 1997 04 09 18 13 359 7.3 -9 670.70 -47.1 -47.0 -47.2 64 -99 SPO 1997 04 09 18 14 358 7.3 -9 670.70 -47.1 -47.0 -47.2 64 -99 SPO 1997 04 09 18 15 357 7.4 -9 670.70 -47.1 -47.1 -47.2 64 -99 SPO 1997 04 09 18 16 357 7.2 -9 670.70 -47.1 -47.1 -47.2 65 -99 SPO 1997 04 09 18 17 358 7.4 -9 670.70 -47.1 -47.2 -47.3 66 -99 SPO 1997 04 09 18 18 358 7.1 -9 670.70 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 19 358 7.1 -9 670.70 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 20 356 7.5 -9 670.60 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 21 356 7.6 -9 670.60 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 22 356 7.4 -9 670.60 -47.2 -47.2 -47.3 66 -99 SPO 1997 04 09 18 23 357 7.5 -9 670.60 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 24 357 7.7 -9 670.60 -47.3 -47.2 -47.4 65 -99 SPO 1997 04 09 18 25 358 7.7 -9 670.60 -47.3 -47.2 -47.4 64 -99 SPO 1997 04 09 18 26 358 7.6 -9 670.60 -47.3 -47.3 -47.4 64 -99 SPO 1997 04 09 18 27 357 7.7 -9 670.50 -47.3 -47.2 -47.4 64 -99 SPO 1997 04 09 18 28 357 8.0 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 29 357 7.9 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 30 357 7.9 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 31 357 7.9 -9 670.60 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 32 357 8.3 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 33 358 8.1 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 34 357 7.9 -9 670.50 -47.3 -47.2 -47.4 65 -99 SPO 1997 04 09 18 35 356 8.0 -9 670.50 -47.3 -47.3 -47.4 65 -99 SPO 1997 04 09 18 36 356 8.0 -9 670.50 -47.3 -47.4 -47.4 65 -99 SPO 1997 04 09 18 37 356 8.0 -9 670.50 -47.3 -47.4 -47.4 64 -99 SPO 1997 04 09 18 38 355 7.8 -9 670.50 -47.3 -47.4 -47.5 64 -99 SPO 1997 04 09 18 39 356 7.9 -9 670.50 -47.4 -47.4 -47.5 65 -99 SPO 1997 04 09 18 40 356 7.8 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 41 356 8.1 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 42 355 8.1 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 43 356 8.5 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 44 356 8.4 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 45 355 8.3 -9 670.50 -47.4 -47.4 -47.5 67 -99 SPO 1997 04 09 18 46 355 8.3 -9 670.50 -47.4 -47.4 -47.5 67 -99 SPO 1997 04 09 18 47 355 8.3 -9 670.50 -47.4 -47.4 -47.6 66 -99 SPO 1997 04 09 18 48 355 8.5 -9 670.50 -47.4 -47.4 -47.6 65 -99 SPO 1997 04 09 18 49 355 8.4 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 50 356 8.4 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 51 355 8.1 -9 670.50 -47.5 -47.4 -47.6 64 -99 SPO 1997 04 09 18 52 356 8.1 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 53 355 8.2 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 54 356 8.1 -9 670.40 -47.5 -47.5 -47.6 65 -99 SPO 1997 04 09 18 55 356 8.5 -9 670.40 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 56 356 8.5 -9 670.50 -47.5 -47.6 -47.6 66 -99 SPO 1997 04 09 18 57 356 8.4 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 58 356 8.0 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 59 356 8.3 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 19 00 356 8.3 -9 670.50 -47.6 -47.6 -47.6 65 0 SPO 1997 04 09 19 01 355 8.1 -9 670.50 -47.6 -47.6 -47.6 65 -99 SPO 1997 04 09 19 02 356 7.8 -9 670.50 -47.6 -47.6 -47.7 65 -99 SPO 1997 04 09 19 03 355 8.0 -9 670.50 -47.6 -47.6 -47.7 64 -99 SPO 1997 04 09 19 04 355 8.2 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 05 355 8.3 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 06 356 8.6 -9 670.50 -47.6 -47.7 -47.8 65 -99 SPO 1997 04 09 19 07 355 8.4 -9 670.50 -47.6 -47.6 -47.8 65 -99 SPO 1997 04 09 19 08 355 8.4 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 09 355 8.6 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 10 355 8.4 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 11 355 8.6 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 12 355 8.6 -9 670.50 -47.6 -47.6 -47.7 65 -99 SPO 1997 04 09 19 13 354 8.3 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 14 355 8.5 -9 670.40 -47.6 -47.7 -47.8 64 -99 SPO 1997 04 09 19 15 355 8.4 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 16 354 8.4 -9 670.40 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 09 19 17 354 8.4 -9 670.50 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 09 19 18 354 8.6 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 19 355 8.5 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 20 356 8.5 -9 670.40 -47.7 -47.7 -47.7 65 -99 SPO 1997 04 09 19 21 356 8.2 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 22 357 8.2 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 23 357 8.2 -9 670.40 -47.7 -47.8 -47.8 66 -99 SPO 1997 04 09 19 24 357 8.6 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 25 358 8.3 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 26 358 8.5 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 27 358 8.2 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 28 359 8.1 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 29 359 8.5 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 30 0 8.6 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 31 360 8.6 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 32 360 8.4 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 33 1 8.3 -9 670.50 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 34 2 8.3 -9 670.40 -47.7 -47.8 -47.8 66 -99 SPO 1997 04 09 19 35 2 8.1 -9 670.40 -47.7 -47.9 -47.8 66 -99 SPO 1997 04 09 19 36 2 7.9 -9 670.40 -47.7 -47.9 -47.8 66 -99 SPO 1997 04 09 19 37 2 7.3 -9 670.50 -47.7 -47.9 -47.9 66 -99 SPO 1997 04 09 19 38 4 7.8 -9 670.50 -47.7 -47.9 -47.9 65 -99 SPO 1997 04 09 19 39 5 7.9 -9 670.50 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 09 19 40 4 8.0 -9 670.50 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 19 41 4 8.3 -9 670.40 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 09 19 42 4 7.6 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 43 2 8.1 -9 670.50 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 44 2 7.9 -9 670.50 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 45 2 7.9 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 46 3 7.8 -9 670.50 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 19 47 2 7.8 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 48 3 7.9 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 49 2 8.1 -9 670.50 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 50 2 8.2 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 51 3 7.6 -9 670.50 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 19 52 3 8.0 -9 670.50 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 19 53 3 7.4 -9 670.40 -47.8 -47.9 -47.8 65 -99 SPO 1997 04 09 19 54 4 7.5 -9 670.40 -47.8 -47.9 -47.8 66 -99 SPO 1997 04 09 19 55 3 7.5 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 56 4 8.0 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 57 3 8.1 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 58 3 7.8 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 59 3 8.1 -9 670.40 -47.7 -48.0 -47.9 66 -99 SPO 1997 04 09 20 00 4 8.3 -9 670.40 -47.8 -48.0 -47.9 67 0 SPO 1997 04 09 20 01 3 8.5 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 02 3 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 03 3 8.2 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 04 4 8.2 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 05 3 8.0 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 06 4 7.8 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 07 4 7.8 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 08 4 8.2 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 09 5 7.9 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 10 5 7.5 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 20 11 5 8.0 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 12 3 8.0 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 13 3 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 14 4 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 15 3 7.8 -9 670.40 -47.8 -48.1 -47.9 65 -99 SPO 1997 04 09 20 16 3 8.1 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 17 2 8.0 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 18 2 8.7 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 19 1 8.2 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 20 2 8.5 -9 670.40 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 21 1 8.5 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 22 2 8.3 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 23 1 8.2 -9 670.30 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 24 1 8.4 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 25 1 9.0 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 26 1 8.4 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 27 1 8.2 -9 670.40 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 28 3 8.1 -9 670.40 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 29 2 8.4 -9 670.30 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 30 360 8.5 -9 670.30 -47.9 -48.0 -48.0 65 -99 SPO 1997 04 09 20 31 360 8.6 -9 670.30 -47.8 -48.0 -48.0 64 -99 SPO 1997 04 09 20 32 359 8.9 -9 670.30 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 09 20 33 0 8.4 -9 670.30 -47.8 -48.1 -48.0 66 -99 SPO 1997 04 09 20 34 3 8.4 -9 670.30 -47.8 -48.1 -48.0 67 -99 SPO 1997 04 09 20 35 2 8.0 -9 670.30 -47.8 -48.1 -48.0 67 -99 SPO 1997 04 09 20 36 2 8.3 -9 670.30 -47.8 -48.1 -48.0 66 -99 SPO 1997 04 09 20 37 2 8.5 -9 670.40 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 38 1 8.6 -9 670.40 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 39 1 8.6 -9 670.40 -47.9 -48.1 -48.1 66 -99 SPO 1997 04 09 20 40 360 8.7 -9 670.30 -48.0 -48.1 -48.0 66 -99 SPO 1997 04 09 20 41 359 8.4 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 42 359 9.2 -9 670.30 -48.0 -48.1 -48.1 65 -99 SPO 1997 04 09 20 43 358 8.7 -9 670.30 -48.0 -48.2 -48.1 66 -99 SPO 1997 04 09 20 44 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 45 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 46 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 47 359 8.4 -9 670.30 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 48 359 8.2 -9 670.40 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 49 0 8.3 -9 670.40 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 50 359 8.1 -9 670.40 -48.0 -48.2 -48.2 65 -99 SPO 1997 04 09 20 51 358 8.6 -9 670.40 -48.0 -48.2 -48.1 65 -99 SPO 1997 04 09 20 52 357 8.7 -9 670.40 -48.0 -48.2 -48.2 65 -99 SPO 1997 04 09 20 53 357 8.8 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 54 357 9.2 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 55 357 9.3 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 56 357 9.4 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 57 358 8.9 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 58 357 9.0 -9 670.30 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 09 20 59 357 8.9 -9 670.40 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 09 21 00 358 8.7 -9 670.30 -48.2 -48.3 -48.3 67 0 SPO 1997 04 09 21 01 358 8.6 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 02 358 8.6 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 03 356 8.8 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 04 357 8.4 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 05 358 8.4 -9 670.40 -48.2 -48.2 -48.3 65 -99 SPO 1997 04 09 21 06 358 8.5 -9 670.40 -48.2 -48.2 -48.3 65 -99 SPO 1997 04 09 21 07 357 8.6 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 08 358 8.7 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 09 357 8.6 -9 670.30 -48.3 -48.3 -48.4 66 -99 SPO 1997 04 09 21 10 355 8.4 -9 670.30 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 09 21 11 356 8.5 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 12 356 8.4 -9 670.30 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 13 356 8.3 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 14 357 8.3 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 15 357 8.2 -9 670.30 -48.3 -48.5 -48.5 65 -99 SPO 1997 04 09 21 16 357 8.3 -9 670.30 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 17 356 8.3 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 18 357 8.2 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 19 357 8.6 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 20 357 8.4 -9 670.30 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 09 21 21 357 8.2 -9 670.30 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 09 21 22 357 8.4 -9 670.30 -48.3 -48.5 -48.5 66 -99 SPO 1997 04 09 21 23 356 8.2 -9 670.30 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 24 356 8.5 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 25 355 9.0 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 26 355 8.9 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 27 356 8.7 -9 670.30 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 28 357 8.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 29 356 9.1 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 30 356 9.1 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 31 356 9.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 32 356 9.6 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 33 356 9.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 34 356 9.2 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 35 357 9.6 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 36 358 9.4 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 37 357 9.6 -9 670.20 -48.4 -48.6 -48.6 66 -99 SPO 1997 04 09 21 38 358 9.4 -9 670.20 -48.4 -48.6 -48.6 66 -99 SPO 1997 04 09 21 39 358 9.0 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 40 358 9.4 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 41 357 9.1 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 42 357 9.6 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 43 357 9.1 -9 670.20 -48.6 -48.6 -48.6 66 -99 SPO 1997 04 09 21 44 358 9.2 -9 670.20 -48.6 -48.6 -48.7 66 -99 SPO 1997 04 09 21 45 357 9.4 -9 670.20 -48.6 -48.6 -48.7 66 -99 SPO 1997 04 09 21 46 358 9.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 47 358 9.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 48 357 9.2 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 49 358 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 50 357 8.8 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 51 358 8.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 52 358 8.4 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 53 359 9.3 -9 670.20 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 21 54 359 9.2 -9 670.20 -48.5 -48.5 -48.5 66 -99 SPO 1997 04 09 21 55 0 9.0 -9 670.20 -48.5 -48.5 -48.5 66 -99 SPO 1997 04 09 21 56 360 8.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 57 0 9.2 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 58 2 9.0 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 59 2 8.9 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 00 1 8.9 -9 670.20 -48.5 -48.6 -48.6 66 0 SPO 1997 04 09 22 01 2 8.9 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 02 3 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 03 2 9.3 -9 670.10 -48.6 -48.6 -48.6 68 -99 SPO 1997 04 09 22 04 2 9.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 05 2 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 06 2 9.3 -9 670.10 -48.5 -48.6 -48.6 65 -99 SPO 1997 04 09 22 07 3 8.9 -9 670.20 -48.5 -48.6 -48.6 65 -99 SPO 1997 04 09 22 08 2 8.8 -9 670.20 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 09 22 09 2 8.9 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 10 3 8.1 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 22 11 3 8.5 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 22 12 4 8.3 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 13 3 8.1 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 14 4 8.0 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 15 5 8.0 -9 670.30 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 16 6 8.1 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 17 5 8.7 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 18 4 8.3 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 19 4 8.3 -9 670.30 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 22 20 5 8.3 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 21 5 7.5 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 22 7 7.1 -9 670.30 -48.7 -48.8 -48.8 66 -99 SPO 1997 04 09 22 23 8 7.4 -9 670.30 -48.6 -48.8 -48.8 66 -99 SPO 1997 04 09 22 24 10 7.2 -9 670.40 -48.6 -48.8 -48.8 64 -99 SPO 1997 04 09 22 25 10 7.3 -9 670.40 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 26 9 7.6 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 27 8 7.9 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 28 7 7.8 -9 670.30 -48.6 -48.8 -48.6 66 -99 SPO 1997 04 09 22 29 7 7.4 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 30 7 7.3 -9 670.40 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 31 7 7.6 -9 670.30 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 32 7 7.4 -9 670.30 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 33 6 7.4 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 34 7 8.2 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 35 7 7.6 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 36 10 7.5 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 37 10 7.5 -9 670.30 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 22 38 11 7.1 -9 670.30 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 39 13 7.3 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 40 10 7.6 -9 670.30 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 22 41 9 8.5 -9 670.30 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 22 42 5 8.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 43 6 8.8 -9 670.20 -48.4 -48.6 -48.6 64 -99 SPO 1997 04 09 22 44 5 8.0 -9 670.20 -48.5 -48.7 -48.7 63 -99 SPO 1997 04 09 22 45 5 8.3 -9 670.20 -48.5 -48.8 -48.7 65 -99 SPO 1997 04 09 22 46 7 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 47 6 8.4 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 22 48 7 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 49 5 8.6 -9 670.20 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 09 22 50 5 8.3 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 51 5 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 52 5 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 53 3 8.4 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 54 5 8.2 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 55 4 8.7 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 56 5 8.5 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 57 6 8.2 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 58 6 8.0 -9 670.30 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 22 59 6 8.4 -9 670.20 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 00 7 8.6 -9 670.20 -48.5 -48.7 -48.6 66 0 SPO 1997 04 09 23 01 6 8.5 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 02 5 8.6 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 03 5 8.9 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 23 04 5 8.7 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 23 05 5 8.4 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 23 06 6 8.4 -9 670.30 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 09 23 07 8 8.6 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 08 7 8.7 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 09 6 9.4 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 10 7 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 11 7 8.9 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 12 5 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 13 7 9.1 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 14 5 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 15 5 8.8 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 16 5 9.1 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 17 6 9.0 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 23 18 5 9.1 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 23 19 6 8.7 -9 670.20 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 23 20 5 9.0 -9 670.20 -48.6 -48.7 -48.7 63 -99 SPO 1997 04 09 23 21 6 9.8 -9 670.10 -48.6 -48.7 -48.7 63 -99 SPO 1997 04 09 23 22 6 9.6 -9 670.10 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 23 23 5 9.6 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 24 5 10.1 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 25 5 10.0 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 26 5 9.5 -9 670.10 -48.6 -48.7 -48.7 67 -99 SPO 1997 04 09 23 27 6 9.9 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 28 5 9.9 -9 670.10 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 23 29 6 9.8 -9 670.10 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 30 5 9.8 -9 670.10 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 31 5 10.0 -9 670.10 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 32 4 10.3 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 33 4 9.8 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 34 4 9.8 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 35 4 9.6 -9 670.10 -48.5 -48.6 -48.6 67 -99 SPO 1997 04 09 23 36 5 9.4 -9 670.10 -48.5 -48.6 -48.6 67 -99 SPO 1997 04 09 23 37 4 9.7 -9 670.10 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 38 3 9.8 -9 670.20 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 39 2 9.7 -9 670.10 -48.5 -48.5 -48.5 68 -99 SPO 1997 04 09 23 40 2 9.8 -9 670.20 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 41 3 10.0 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 42 3 9.7 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 43 3 10.0 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 44 3 9.9 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 45 2 9.4 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 46 3 9.6 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 47 3 9.7 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 48 3 9.3 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 49 4 9.0 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 50 6 9.2 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 51 8 8.7 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 52 6 9.0 -9 670.20 -48.4 -48.5 -48.5 67 -99 SPO 1997 04 09 23 53 7 9.1 -9 670.20 -48.4 -48.4 -48.4 67 -99 SPO 1997 04 09 23 54 6 9.1 -9 670.20 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 09 23 55 6 9.4 -9 670.20 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 09 23 56 7 9.2 -9 670.20 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 09 23 57 7 8.8 -9 670.20 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 09 23 58 9 9.3 -9 670.20 -48.4 -48.4 -48.4 -99 -99 SPO 1997 04 09 23 59 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 00 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 0 SPO 1997 04 10 00 01 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 02 7 9.0 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 03 8 9.1 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 04 7 9.3 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 05 7 9.1 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 06 8 9.5 -9 670.10 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 07 7 9.8 -9 670.10 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 08 8 9.5 -9 670.10 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 09 7 9.6 -9 670.00 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 10 10 9.9 -9 670.00 -48.2 -48.3 -48.3 -99 -99 SPO 1997 04 10 00 11 9 9.5 -9 670.10 -48.2 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 12 9 9.3 -9 670.00 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 13 9 9.4 -9 670.10 -48.3 -48.4 -48.5 67 -99 SPO 1997 04 10 00 14 11 9.2 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 15 12 9.1 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 16 12 9.4 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 17 13 8.9 -9 670.10 -48.4 -48.4 -48.4 68 -99 SPO 1997 04 10 00 18 13 9.4 -9 670.10 -48.4 -48.4 -48.5 67 -99 SPO 1997 04 10 00 19 12 9.4 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 20 12 9.9 -9 670.00 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 21 13 9.7 -9 670.00 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 22 14 9.2 -9 670.00 -48.3 -48.6 -48.5 66 -99 SPO 1997 04 10 00 23 14 8.8 -9 670.10 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 24 16 8.9 -9 670.10 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 25 15 9.1 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 26 14 9.6 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 27 14 9.4 -9 670.00 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 28 13 9.1 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 29 14 8.9 -9 670.00 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 30 14 9.3 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 31 15 9.2 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 32 15 8.7 -9 670.00 -48.4 -48.4 -48.5 65 -99 SPO 1997 04 10 00 33 15 8.5 -9 670.10 -48.4 -48.4 -48.5 65 -99 SPO 1997 04 10 00 34 17 8.9 -9 670.10 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 35 17 8.7 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 36 16 9.1 -9 670.10 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 37 16 9.2 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 38 16 8.6 -9 670.20 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 39 16 8.0 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 40 17 8.4 -9 670.20 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 41 15 8.0 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 42 14 8.6 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 43 15 8.2 -9 670.20 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 10 00 44 15 8.3 -9 670.20 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 10 00 45 15 8.0 -9 670.20 -48.4 -48.5 -48.4 65 -99 SPO 1997 04 10 00 46 15 8.1 -9 670.20 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 10 00 47 15 8.6 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 48 15 8.2 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 49 15 7.8 -9 670.20 -48.4 -48.5 -48.5 67 -99 SPO 1997 04 10 00 50 15 8.2 -9 670.20 -48.4 -48.5 -48.4 68 -99 SPO 1997 04 10 00 51 14 8.0 -9 670.20 -48.3 -48.5 -48.5 67 -99 SPO 1997 04 10 00 52 14 8.6 -9 670.20 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 53 12 8.7 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 54 12 8.9 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 55 13 8.9 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 56 11 8.4 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 57 11 8.2 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 58 12 8.4 -9 670.10 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 59 10 8.7 -9 670.10 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 01 00 10 8.6 -9 670.10 -48.3 -48.4 -48.4 66 0 SPO 1997 04 10 01 01 9 8.8 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 02 9 8.6 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 03 9 9.2 -9 670.00 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 04 10 8.5 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 05 10 8.5 -9 670.00 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 06 12 8.2 -9 670.00 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 07 12 9.6 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 08 12 9.4 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 09 10 9.2 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 10 10 9.8 -9 669.90 -48.2 -48.3 -48.3 68 -99 SPO 1997 04 10 01 11 9 9.4 -9 669.90 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 12 10 9.9 -9 669.90 -48.2 -48.2 -48.2 69 -99 SPO 1997 04 10 01 13 9 10.0 -9 669.80 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 14 10 9.7 -9 669.80 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 15 10 9.8 -9 669.90 -48.2 -48.3 -48.2 68 -99 SPO 1997 04 10 01 16 10 9.2 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 01 17 9 8.8 -9 669.80 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 18 9 9.3 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 19 8 9.3 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 20 7 10.0 -9 669.80 -48.2 -48.4 -48.2 66 -99 SPO 1997 04 10 01 21 6 9.8 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 01 22 5 9.3 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 01 23 4 9.8 -9 669.90 -48.1 -48.2 -48.2 67 -99 SPO 1997 04 10 01 24 6 9.6 -9 669.90 -48.1 -48.2 -48.2 67 -99 SPO 1997 04 10 01 25 5 9.1 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 26 6 9.0 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 27 4 9.2 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 28 5 9.3 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 29 4 9.1 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 30 3 9.1 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 31 4 9.1 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 32 5 8.9 -9 669.90 -48.0 -48.2 -48.2 66 -99 SPO 1997 04 10 01 33 5 8.8 -9 670.00 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 10 01 34 6 8.8 -9 669.90 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 10 01 35 6 8.8 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 36 6 8.6 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 37 6 8.4 -9 669.90 -48.0 -48.2 -48.1 68 -99 SPO 1997 04 10 01 38 6 8.8 -9 669.90 -48.0 -48.2 -48.1 68 -99 SPO 1997 04 10 01 39 5 9.3 -9 669.80 -48.0 -48.1 -48.0 68 -99 SPO 1997 04 10 01 40 4 9.3 -9 669.80 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 10 01 41 3 9.8 -9 669.90 -47.9 -48.0 -47.9 67 -99 SPO 1997 04 10 01 42 2 8.9 -9 669.90 -47.9 -48.0 -47.9 67 -99 SPO 1997 04 10 01 43 5 8.4 -9 669.90 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 10 01 44 7 8.7 -9 669.90 -47.8 -48.0 -47.9 65 -99 SPO 1997 04 10 01 45 8 8.0 -9 669.90 -47.8 -48.0 -47.9 65 -99 SPO 1997 04 10 01 46 9 8.5 -9 669.90 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 10 01 47 7 8.6 -9 669.90 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 10 01 48 5 9.2 -9 669.90 -47.8 -48.0 -48.0 66 -99 SPO 1997 04 10 01 49 3 8.8 -9 669.90 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 10 01 50 1 9.0 -9 669.90 -47.8 -47.9 -47.9 64 -99 SPO 1997 04 10 01 51 2 8.8 -9 669.90 -47.8 -47.8 -47.8 64 -99 SPO 1997 04 10 01 52 4 8.9 -9 669.80 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 53 5 8.6 -9 669.90 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 54 7 8.0 -9 669.90 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 55 6 9.3 -9 669.90 -47.7 -47.9 -47.8 64 -99 SPO 1997 04 10 01 56 4 9.3 -9 669.80 -47.6 -47.8 -47.8 64 -99 SPO 1997 04 10 01 57 2 9.9 -9 669.80 -47.6 -47.8 -47.7 64 -99 SPO 1997 04 10 01 58 3 9.5 -9 669.80 -47.6 -47.8 -47.7 66 -99 SPO 1997 04 10 01 59 2 9.1 -9 669.80 -47.6 -47.8 -47.8 68 -99 SPO 1997 04 10 02 00 3 8.7 -9 669.80 -47.7 -47.9 -47.8 69 0 SPO 1997 04 10 02 01 5 8.0 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 02 7 7.4 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 03 9 7.4 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 04 7 8.6 -9 669.80 -47.7 -47.8 -47.8 69 -99 SPO 1997 04 10 02 05 2 9.2 -9 669.80 -47.7 -47.8 -47.7 69 -99 SPO 1997 04 10 02 06 1 9.5 -9 669.80 -47.7 -47.8 -47.8 69 -99 SPO 1997 04 10 02 07 3 8.9 -9 669.80 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 08 4 8.8 -9 669.90 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 09 4 8.7 -9 669.90 -47.7 -47.8 -47.9 67 -99 SPO 1997 04 10 02 10 3 9.4 -9 669.80 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 11 2 8.6 -9 669.80 -47.8 -47.8 -47.9 67 -99 SPO 1997 04 10 02 12 3 9.1 -9 669.80 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 10 02 13 3 8.7 -9 669.80 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 10 02 14 2 8.5 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 15 3 9.0 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 16 4 8.5 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 17 5 9.2 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 18 3 9.2 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 19 3 9.7 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 20 2 9.7 -9 669.80 -47.8 -48.0 -48.0 67 -99 SPO 1997 04 10 02 21 1 9.4 -9 669.80 -47.9 -48.0 -48.0 68 -99 SPO 1997 04 10 02 22 1 8.9 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 23 3 9.6 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 24 2 8.9 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 25 2 9.2 -9 669.80 -47.9 -48.1 -48.1 67 -99 SPO 1997 04 10 02 26 1 9.5 -9 669.80 -47.9 -48.1 -48.1 67 -99 SPO 1997 04 10 02 27 1 8.8 -9 669.80 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 10 02 28 1 8.2 -9 669.90 -48.0 -48.1 -48.2 67 -99 SPO 1997 04 10 02 29 0 8.3 -9 669.80 -48.0 -48.1 -48.2 67 -99 SPO 1997 04 10 02 30 1 8.8 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 31 359 8.7 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 32 360 9.8 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 33 358 9.4 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 34 359 9.2 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 35 360 9.3 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 02 36 1 8.9 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 02 37 1 8.8 -9 669.80 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 02 38 2 9.1 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 39 0 9.0 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 40 1 9.0 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 41 2 8.6 -9 669.80 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 02 42 3 8.6 -9 669.80 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 10 02 43 4 8.4 -9 669.80 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 10 02 44 5 8.7 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 45 4 9.4 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 46 1 9.7 -9 669.80 -48.1 -48.3 -48.2 64 -99 SPO 1997 04 10 02 47 360 9.3 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 48 2 9.2 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 49 3 8.6 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 50 6 8.3 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 51 5 9.1 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 52 1 9.4 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 53 1 9.8 -9 669.80 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 02 54 2 9.4 -9 669.80 -48.1 -48.4 -48.3 66 -99 SPO 1997 04 10 02 55 1 10.2 -9 669.80 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 02 56 0 9.7 -9 669.80 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 02 57 1 9.4 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 58 3 9.0 -9 669.80 -48.1 -48.4 -48.2 65 -99 SPO 1997 04 10 02 59 4 8.3 -9 669.90 -48.2 -48.4 -48.2 66 -99 SPO 1997 04 10 03 00 5 8.6 -9 669.80 -48.2 -48.4 -48.3 66 0 SPO 1997 04 10 03 01 5 9.2 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 02 4 9.4 -9 669.70 -48.1 -48.4 -48.3 66 -99 SPO 1997 04 10 03 03 6 9.9 -9 669.70 -48.1 -48.3 -48.2 67 -99 SPO 1997 04 10 03 04 5 9.7 -9 669.70 -48.1 -48.3 -48.2 67 -99 SPO 1997 04 10 03 05 5 9.7 -9 669.70 -48.1 -48.3 -48.2 68 -99 SPO 1997 04 10 03 06 3 9.8 -9 669.80 -48.2 -48.3 -48.2 69 -99 SPO 1997 04 10 03 07 3 9.6 -9 669.80 -48.2 -48.3 -48.3 68 -99 SPO 1997 04 10 03 08 4 8.9 -9 669.80 -48.2 -48.4 -48.3 68 -99 SPO 1997 04 10 03 09 6 8.8 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 10 7 7.8 -9 669.90 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 11 9 7.2 -9 669.90 -48.1 -48.4 -48.2 65 -99 SPO 1997 04 10 03 12 11 6.6 -9 669.90 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 13 12 7.3 -9 670.00 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 14 7 8.0 -9 669.90 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 15 4 9.5 -9 669.80 -48.1 -48.5 -48.2 67 -99 SPO 1997 04 10 03 16 4 9.5 -9 669.80 -48.2 -48.5 -48.3 68 -99 SPO 1997 04 10 03 17 4 9.3 -9 669.80 -48.2 -48.5 -48.3 67 -99 SPO 1997 04 10 03 18 4 8.9 -9 669.90 -48.2 -48.5 -48.4 67 -99 SPO 1997 04 10 03 19 5 8.8 -9 669.90 -48.2 -48.5 -48.4 66 -99 SPO 1997 04 10 03 20 7 8.9 -9 669.90 -48.2 -48.5 -48.4 66 -99 SPO 1997 04 10 03 21 6 8.7 -9 669.90 -48.2 -48.5 -48.3 66 -99 SPO 1997 04 10 03 22 8 8.3 -9 669.90 -48.2 -48.4 -48.3 65 -99 SPO 1997 04 10 03 23 9 8.2 -9 669.90 -48.2 -48.4 -48.3 65 -99 SPO 1997 04 10 03 24 12 7.8 -9 669.90 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 25 15 7.7 -9 670.00 -48.2 -48.5 -48.3 67 -99 SPO 1997 04 10 03 26 13 8.6 -9 669.90 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 03 27 9 8.7 -9 669.90 -48.2 -48.4 -48.3 68 -99 SPO 1997 04 10 03 28 6 9.1 -9 669.90 -48.3 -48.5 -48.4 69 -99 SPO 1997 04 10 03 29 5 9.1 -9 669.90 -48.3 -48.5 -48.4 68 -99 SPO 1997 04 10 03 30 5 9.0 -9 669.90 -48.3 -48.6 -48.4 67 -99 SPO 1997 04 10 03 31 6 8.2 -9 669.90 -48.3 -48.6 -48.4 67 -99 SPO 1997 04 10 03 32 8 8.3 -9 670.00 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 33 10 7.6 -9 670.00 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 34 9 8.7 -9 669.90 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 35 5 9.8 -9 669.90 -48.3 -48.7 -48.5 66 -99 SPO 1997 04 10 03 36 5 9.1 -9 669.90 -48.4 -48.7 -48.6 67 -99 SPO 1997 04 10 03 37 5 8.6 -9 669.90 -48.4 -48.7 -48.6 67 -99 SPO 1997 04 10 03 38 6 8.6 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 03 39 7 8.3 -9 669.90 -48.5 -48.8 -48.7 67 -99 SPO 1997 04 10 03 40 10 7.7 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 03 41 12 7.5 -9 669.90 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 03 42 15 7.5 -9 669.90 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 03 43 20 6.9 -9 670.00 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 03 44 19 6.8 -9 669.90 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 03 45 12 8.3 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 03 46 7 8.3 -9 669.80 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 10 03 47 10 8.6 -9 669.90 -48.5 -48.8 -48.7 65 -99 SPO 1997 04 10 03 48 10 8.6 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 49 10 9.1 -9 669.90 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 50 11 8.4 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 51 13 8.0 -9 669.90 -48.6 -48.9 -48.7 67 -99 SPO 1997 04 10 03 52 15 7.2 -9 669.90 -48.6 -48.9 -48.7 67 -99 SPO 1997 04 10 03 53 18 7.2 -9 669.90 -48.6 -48.9 -48.7 68 -99 SPO 1997 04 10 03 54 17 7.0 -9 670.00 -48.6 -48.9 -48.6 68 -99 SPO 1997 04 10 03 55 15 7.7 -9 669.90 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 03 56 9 9.0 -9 669.80 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 03 57 11 8.7 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 03 58 11 8.9 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 59 12 8.3 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 04 00 13 8.6 -9 669.90 -48.6 -48.9 -48.7 66 0 SPO 1997 04 10 04 01 14 7.8 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 02 14 9.0 -9 669.80 -48.6 -48.8 -48.6 66 -99 SPO 1997 04 10 04 03 13 8.4 -9 669.80 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 04 04 12 8.4 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 05 11 8.3 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 06 10 8.1 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 07 11 8.0 -9 669.80 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 08 8 8.8 -9 669.80 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 09 9 7.8 -9 669.90 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 10 10 7.6 -9 669.90 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 11 11 8.0 -9 669.90 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 12 10 7.9 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 13 10 6.8 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 14 8 7.5 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 15 8 8.2 -9 669.80 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 16 7 7.8 -9 669.80 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 17 9 8.9 -9 669.80 -48.5 -48.8 -48.7 67 -99 SPO 1997 04 10 04 18 8 8.1 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 19 8 8.3 -9 669.80 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 20 8 8.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 21 8 9.0 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 22 9 8.7 -9 669.80 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 10 04 23 6 8.3 -9 669.80 -48.5 -48.8 -48.6 63 -99 SPO 1997 04 10 04 24 6 8.5 -9 669.80 -48.5 -48.7 -48.6 63 -99 SPO 1997 04 10 04 25 8 8.4 -9 669.80 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 10 04 26 8 7.9 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 27 6 8.1 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 28 3 8.5 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 29 6 8.9 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 30 5 8.6 -9 669.70 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 31 5 9.2 -9 669.70 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 32 4 8.6 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 33 5 8.5 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 34 6 8.1 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 35 9 7.6 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 36 10 7.7 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 37 10 7.9 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 38 7 9.0 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 39 3 9.6 -9 669.70 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 40 3 9.8 -9 669.70 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 41 5 9.3 -9 669.80 -48.6 -48.7 -48.6 68 -99 SPO 1997 04 10 04 42 5 8.9 -9 669.80 -48.5 -48.7 -48.7 67 -99 SPO 1997 04 10 04 43 6 8.5 -9 669.80 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 44 6 8.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 45 3 9.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 46 1 10.7 -9 669.70 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 47 359 9.7 -9 669.70 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 48 2 9.1 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 49 4 9.2 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 50 6 9.1 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 51 7 9.6 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 52 4 9.8 -9 669.80 -48.6 -48.9 -48.8 67 -99 SPO 1997 04 10 04 53 2 9.5 -9 669.80 -48.7 -48.9 -48.9 68 -99 SPO 1997 04 10 04 54 0 10.0 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 04 55 1 9.3 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 04 56 2 8.8 -9 669.80 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 04 57 3 8.8 -9 669.80 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 04 58 5 8.3 -9 669.80 -48.8 -48.9 -48.9 66 -99 SPO 1997 04 10 04 59 8 8.9 -9 669.80 -48.8 -48.8 -48.8 66 -99 SPO 1997 04 10 05 00 8 10.0 -9 669.80 -48.7 -48.8 -48.7 65 0 SPO 1997 04 10 05 01 4 10.6 -9 669.80 -48.6 -48.8 -48.8 66 -99 SPO 1997 04 10 05 02 3 9.4 -9 669.80 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 03 2 9.7 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 05 04 2 9.3 -9 669.80 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 05 1 9.6 -9 669.80 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 06 1 9.6 -9 669.70 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 07 360 9.3 -9 669.70 -48.8 -49.0 -48.9 67 -99 SPO 1997 04 10 05 08 360 9.1 -9 669.70 -48.8 -49.0 -48.9 66 -99 SPO 1997 04 10 05 09 360 9.4 -9 669.70 -48.8 -49.0 -48.9 66 -99 SPO 1997 04 10 05 10 1 9.1 -9 669.70 -48.8 -49.0 -48.9 65 -99 SPO 1997 04 10 05 11 3 8.5 -9 669.80 -48.8 -49.0 -48.9 65 -99 SPO 1997 04 10 05 12 4 8.5 -9 669.80 -48.8 -48.9 -48.9 66 -99 SPO 1997 04 10 05 13 1 9.4 -9 669.80 -48.8 -48.9 -48.8 67 -99 SPO 1997 04 10 05 14 2 9.5 -9 669.80 -48.8 -48.8 -48.8 68 -99 SPO 1997 04 10 05 15 3 9.2 -9 669.70 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 16 5 9.5 -9 669.80 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 17 5 8.9 -9 669.80 -48.7 -48.8 -48.8 68 -99 SPO 1997 04 10 05 18 1 10.9 -9 669.70 -48.8 -48.8 -48.8 69 -99 SPO 1997 04 10 05 19 360 10.4 -9 669.70 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 05 20 360 10.0 -9 669.70 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 05 21 1 9.2 -9 669.70 -48.8 -48.9 -49.0 66 -99 SPO 1997 04 10 05 22 2 9.0 -9 669.70 -48.8 -49.0 -49.0 65 -99 SPO 1997 04 10 05 23 2 8.5 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 24 4 8.2 -9 669.80 -48.9 -49.1 -49.0 66 -99 SPO 1997 04 10 05 25 8 8.0 -9 669.80 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 26 6 8.4 -9 669.80 -48.9 -49.0 -48.9 68 -99 SPO 1997 04 10 05 27 3 9.3 -9 669.70 -48.8 -49.0 -48.9 67 -99 SPO 1997 04 10 05 28 359 9.3 -9 669.70 -48.9 -49.1 -49.0 69 -99 SPO 1997 04 10 05 29 0 9.7 -9 669.70 -48.9 -49.1 -49.0 69 -99 SPO 1997 04 10 05 30 2 9.3 -9 669.70 -48.9 -49.1 -49.1 69 -99 SPO 1997 04 10 05 31 3 9.0 -9 669.70 -49.0 -49.1 -49.1 69 -99 SPO 1997 04 10 05 32 4 8.2 -9 669.70 -49.0 -49.1 -49.1 67 -99 SPO 1997 04 10 05 33 5 8.3 -9 669.70 -49.0 -49.1 -49.1 66 -99 SPO 1997 04 10 05 34 6 8.6 -9 669.70 -49.0 -49.1 -49.1 65 -99 SPO 1997 04 10 05 35 2 9.5 -9 669.70 -49.0 -49.1 -49.0 65 -99 SPO 1997 04 10 05 36 2 9.8 -9 669.70 -49.0 -49.0 -49.0 65 -99 SPO 1997 04 10 05 37 1 9.2 -9 669.70 -48.9 -49.1 -49.0 66 -99 SPO 1997 04 10 05 38 1 8.9 -9 669.70 -48.9 -49.0 -49.1 66 -99 SPO 1997 04 10 05 39 360 9.3 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 40 1 9.0 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 41 1 8.7 -9 669.70 -49.0 -49.1 -49.1 67 -99 SPO 1997 04 10 05 42 3 8.5 -9 669.70 -49.0 -49.2 -49.2 67 -99 SPO 1997 04 10 05 43 5 8.3 -9 669.70 -49.0 -49.2 -49.2 66 -99 SPO 1997 04 10 05 44 7 8.4 -9 669.70 -49.1 -49.3 -49.2 66 -99 SPO 1997 04 10 05 45 3 9.7 -9 669.70 -49.1 -49.2 -49.2 66 -99 SPO 1997 04 10 05 46 0 10.2 -9 669.60 -49.1 -49.2 -49.2 66 -99 SPO 1997 04 10 05 47 360 9.9 -9 669.70 -49.1 -49.3 -49.3 65 -99 SPO 1997 04 10 05 48 360 9.7 -9 669.70 -49.2 -49.3 -49.3 66 -99 SPO 1997 04 10 05 49 0 9.2 -9 669.70 -49.2 -49.3 -49.4 67 -99 SPO 1997 04 10 05 50 360 8.6 -9 669.70 -49.2 -49.3 -49.4 66 -99 SPO 1997 04 10 05 51 1 8.4 -9 669.80 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 10 05 52 2 8.0 -9 669.80 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 10 05 53 6 8.0 -9 669.80 -49.3 -49.4 -49.4 67 -99 SPO 1997 04 10 05 54 6 7.5 -9 669.80 -49.2 -49.4 -49.4 66 -99 SPO 1997 04 10 05 55 8 7.0 -9 669.80 -49.2 -49.3 -49.4 65 -99 SPO 1997 04 10 05 56 10 6.8 -9 669.80 -49.3 -49.3 -49.4 65 -99 SPO 1997 04 10 05 57 6 8.8 -9 669.80 -49.3 -49.3 -49.3 65 -99 SPO 1997 04 10 05 58 3 8.8 -9 669.80 -49.2 -49.3 -49.3 64 -99 SPO 1997 04 10 05 59 3 8.3 -9 669.80 -49.2 -49.4 -49.4 64 -99 SPO 1997 04 10 06 00 1 9.0 -9 669.70 -49.3 -49.5 -49.4 65 0 SPO 1997 04 10 06 01 2 8.5 -9 669.80 -49.3 -49.5 -49.5 66 -99 SPO 1997 04 10 06 02 4 8.1 -9 669.80 -49.3 -49.5 -49.5 66 -99 SPO 1997 04 10 06 03 4 9.0 -9 669.80 -49.4 -49.5 -49.4 67 -99 SPO 1997 04 10 06 04 3 9.3 -9 669.80 -49.3 -49.5 -49.4 66 -99 SPO 1997 04 10 06 05 1 8.8 -9 669.70 -49.4 -49.5 -49.4 67 -99 SPO 1997 04 10 06 06 0 8.5 -9 669.80 -49.4 -49.6 -49.6 67 -99 SPO 1997 04 10 06 07 1 8.7 -9 669.80 -49.4 -49.6 -49.6 66 -99 SPO 1997 04 10 06 08 0 8.4 -9 669.80 -49.5 -49.6 -49.7 66 -99 SPO 1997 04 10 06 09 2 8.3 -9 669.80 -49.5 -49.6 -49.6 65 -99 SPO 1997 04 10 06 10 3 8.7 -9 669.80 -49.6 -49.6 -49.6 65 -99 SPO 1997 04 10 06 11 2 9.7 -9 669.70 -49.5 -49.5 -49.5 65 -99 SPO 1997 04 10 06 12 360 9.4 -9 669.70 -49.4 -49.5 -49.5 65 -99 SPO 1997 04 10 06 13 0 9.4 -9 669.80 -49.4 -49.5 -49.6 65 -99 SPO 1997 04 10 06 14 1 9.7 -9 669.80 -49.5 -49.6 -49.6 67 -99 SPO 1997 04 10 06 15 0 8.8 -9 669.80 -49.5 -49.6 -49.6 67 -99 SPO 1997 04 10 06 16 1 8.3 -9 669.80 -49.5 -49.6 -49.7 67 -99 SPO 1997 04 10 06 17 2 8.7 -9 669.80 -49.5 -49.6 -49.7 66 -99 SPO 1997 04 10 06 18 1 8.5 -9 669.80 -49.5 -49.6 -49.7 65 -99 SPO 1997 04 10 06 19 0 8.0 -9 669.80 -49.6 -49.7 -49.6 66 -99 SPO 1997 04 10 06 20 360 8.8 -9 669.80 -49.6 -49.7 -49.7 65 -99 SPO 1997 04 10 06 21 3 8.5 -9 669.80 -49.6 -49.7 -49.7 65 -99 SPO 1997 04 10 06 22 3 7.9 -9 669.80 -49.6 -49.8 -49.7 65 -99 SPO 1997 04 10 06 23 5 8.1 -9 669.80 -49.6 -49.8 -49.7 64 -99 SPO 1997 04 10 06 24 5 8.4 -9 669.80 -49.6 -49.8 -49.8 65 -99 SPO 1997 04 10 06 25 2 9.2 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 26 358 9.3 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 27 359 9.3 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 28 359 8.9 -9 669.80 -49.8 -49.8 -49.8 67 -99 SPO 1997 04 10 06 29 0 8.7 -9 669.80 -49.6 -49.8 -49.8 65 -99 SPO 1997 04 10 06 30 0 8.5 -9 669.80 -49.7 -49.8 -49.9 66 -99 SPO 1997 04 10 06 31 0 8.5 -9 669.80 -49.7 -49.8 -49.9 66 -99 SPO 1997 04 10 06 32 1 8.5 -9 669.80 -49.8 -49.8 -49.9 66 -99 SPO 1997 04 10 06 33 2 8.5 -9 669.90 -49.8 -49.8 -49.9 65 -99 SPO 1997 04 10 06 34 3 8.2 -9 669.90 -49.8 -49.8 -49.9 65 -99 SPO 1997 04 10 06 35 4 7.5 -9 669.90 -49.8 -49.8 -49.9 64 -99 SPO 1997 04 10 06 36 6 7.6 -9 669.90 -49.8 -49.8 -49.9 64 -99 SPO 1997 04 10 06 37 3 8.4 -9 669.90 -49.7 -49.8 -49.8 63 -99 SPO 1997 04 10 06 38 3 8.4 -9 669.90 -49.8 -49.8 -49.8 65 -99 SPO 1997 04 10 06 39 2 7.8 -9 670.00 -49.7 -49.9 -49.8 64 -99 SPO 1997 04 10 06 40 1 7.6 -9 669.90 -49.8 -49.9 -49.9 65 -99 SPO 1997 04 10 06 41 3 7.1 -9 670.00 -49.8 -50.0 -49.9 65 -99 SPO 1997 04 10 06 42 4 7.0 -9 670.00 -49.8 -50.0 -50.0 65 -99 SPO 1997 04 10 06 43 5 6.6 -9 670.00 -49.9 -50.0 -50.0 66 -99 SPO 1997 04 10 06 44 2 7.2 -9 669.90 -49.9 -50.0 -50.0 65 -99 SPO 1997 04 10 06 45 358 8.1 -9 669.90 -49.9 -50.0 -49.9 65 -99 SPO 1997 04 10 06 46 358 8.5 -9 669.80 -49.9 -50.0 -50.0 64 -99 SPO 1997 04 10 06 47 359 8.8 -9 669.80 -49.8 -49.9 -50.0 63 -99 SPO 1997 04 10 06 48 359 8.3 -9 669.80 -49.9 -50.0 -50.0 65 -99 SPO 1997 04 10 06 49 359 8.0 -9 669.90 -49.9 -50.0 -50.1 65 -99 SPO 1997 04 10 06 50 359 7.9 -9 669.90 -50.0 -50.0 -50.1 64 -99 SPO 1997 04 10 06 51 360 7.5 -9 669.90 -50.0 -50.1 -50.2 64 -99 SPO 1997 04 10 06 52 1 7.0 -9 670.00 -50.0 -50.1 -50.2 64 -99 SPO 1997 04 10 06 53 3 6.9 -9 670.00 -50.1 -50.1 -50.2 64 -99 SPO 1997 04 10 06 54 3 7.3 -9 670.00 -50.1 -50.1 -50.2 64 -99 SPO 1997 04 10 06 55 2 7.6 -9 670.00 -50.1 -50.1 -50.1 64 -99 SPO 1997 04 10 06 56 2 7.9 -9 670.00 -50.0 -50.1 -50.1 63 -99 SPO 1997 04 10 06 57 1 7.7 -9 670.00 -50.1 -50.1 -50.1 64 -99 SPO 1997 04 10 06 58 2 8.1 -9 670.00 -50.1 -50.2 -50.1 63 -99 SPO 1997 04 10 06 59 2 7.4 -9 670.00 -50.1 -50.2 -50.2 63 -99 SPO 1997 04 10 07 00 3 7.6 -9 670.00 -50.1 -50.2 -50.2 64 0 SPO 1997 04 10 07 01 3 7.9 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 02 2 8.2 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 03 2 8.5 -9 670.00 -50.2 -50.2 -50.2 65 -99 SPO 1997 04 10 07 04 2 8.2 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 05 2 8.1 -9 670.00 -50.1 -50.2 -50.3 65 -99 SPO 1997 04 10 07 06 2 8.1 -9 670.00 -50.2 -50.2 -50.3 65 -99 SPO 1997 04 10 07 07 3 8.2 -9 670.00 -50.2 -50.2 -50.3 65 -99 SPO 1997 04 10 07 08 3 7.9 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 09 5 8.2 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 10 5 7.8 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 11 5 7.4 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 12 6 7.7 -9 670.00 -50.2 -50.2 -50.4 64 -99 SPO 1997 04 10 07 13 7 7.7 -9 670.00 -50.2 -50.2 -50.4 64 -99 SPO 1997 04 10 07 14 8 7.6 -9 670.00 -50.3 -50.3 -50.4 65 -99 SPO 1997 04 10 07 15 10 8.0 -9 670.00 -50.2 -50.4 -50.4 65 -99 SPO 1997 04 10 07 16 10 7.7 -9 670.00 -50.3 -50.4 -50.4 66 -99 SPO 1997 04 10 07 17 11 7.6 -9 670.00 -50.3 -50.4 -50.4 66 -99 SPO 1997 04 10 07 18 11 7.5 -9 670.00 -50.3 -50.4 -50.4 65 -99 SPO 1997 04 10 07 19 9 7.7 -9 670.00 -50.4 -50.4 -50.4 66 -99 SPO 1997 04 10 07 20 9 7.2 -9 670.00 -50.4 -50.4 -50.4 65 -99 SPO 1997 04 10 07 21 8 7.8 -9 670.00 -50.3 -50.4 -50.4 64 -99 SPO 1997 04 10 07 22 6 7.8 -9 669.90 -50.2 -50.3 -50.4 63 -99 SPO 1997 04 10 07 23 5 8.1 -9 669.90 -50.3 -50.3 -50.4 64 -99 SPO 1997 04 10 07 24 5 7.8 -9 669.90 -50.3 -50.3 -50.4 64 -99 SPO 1997 04 10 07 25 6 8.2 -9 669.90 -50.3 -50.3 -50.4 66 -99 SPO 1997 04 10 07 26 6 8.1 -9 669.90 -50.3 -50.3 -50.4 66 -99 SPO 1997 04 10 07 27 6 8.0 -9 670.00 -50.3 -50.3 -50.4 65 -99 SPO 1997 04 10 07 28 7 8.0 -9 670.00 -50.3 -50.3 -50.5 65 -99 SPO 1997 04 10 07 29 6 7.7 -9 670.00 -50.4 -50.3 -50.5 65 -99 SPO 1997 04 10 07 30 6 7.6 -9 670.00 -50.4 -50.3 -50.5 65 -99 SPO 1997 04 10 07 31 7 7.5 -9 670.00 -50.4 -50.3 -50.5 64 -99 SPO 1997 04 10 07 32 8 7.4 -9 670.00 -50.4 -50.4 -50.5 64 -99 SPO 1997 04 10 07 33 10 7.4 -9 670.00 -50.3 -50.4 -50.5 64 -99 SPO 1997 04 10 07 34 10 7.0 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 35 11 7.0 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 36 11 6.7 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 37 12 6.7 -9 670.10 -50.4 -50.5 -50.5 65 -99 SPO 1997 04 10 07 38 10 6.1 -9 670.10 -50.5 -50.5 -50.6 66 -99 SPO 1997 04 10 07 39 10 6.8 -9 670.10 -50.4 -50.5 -50.6 65 -99 SPO 1997 04 10 07 40 8 7.1 -9 670.10 -50.4 -50.5 -50.6 65 -99 SPO 1997 04 10 07 41 7 7.5 -9 670.00 -50.4 -50.5 -50.5 65 -99 SPO 1997 04 10 07 42 8 7.4 -9 670.00 -50.4 -50.5 -50.6 64 -99 SPO 1997 04 10 07 43 9 7.7 -9 670.00 -50.5 -50.5 -50.6 65 -99 SPO 1997 04 10 07 44 9 7.8 -9 670.00 -50.5 -50.4 -50.5 64 -99 SPO 1997 04 10 07 45 11 7.6 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 46 11 7.3 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 47 12 7.2 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 48 12 6.6 -9 670.10 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 49 12 6.7 -9 670.10 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 50 10 7.2 -9 670.00 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 51 8 7.8 -9 670.00 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 52 8 7.7 -9 670.00 -50.6 -50.7 -50.7 65 -99 SPO 1997 04 10 07 53 8 7.9 -9 670.00 -50.6 -50.7 -50.7 64 -99 SPO 1997 04 10 07 54 10 7.6 -9 670.00 -50.7 -50.8 -50.8 65 -99 SPO 1997 04 10 07 55 10 7.2 -9 669.90 -50.7 -50.8 -50.8 64 -99 SPO 1997 04 10 07 56 11 7.3 -9 670.00 -50.7 -50.8 -50.9 64 -99 SPO 1997 04 10 07 57 13 6.8 -9 670.00 -50.7 -50.8 -50.9 63 -99 SPO 1997 04 10 07 58 17 6.6 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 07 59 18 6.1 -9 670.10 -50.8 -50.9 -50.9 63 -99 SPO 1997 04 10 08 00 15 6.5 -9 670.10 -50.8 -50.8 -50.9 64 0 SPO 1997 04 10 08 01 11 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 02 10 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 03 11 7.2 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 04 10 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 05 11 6.9 -9 670.00 -50.9 -50.8 -51.0 66 -99 SPO 1997 04 10 08 06 12 6.9 -9 670.00 -50.9 -50.8 -51.0 65 -99 SPO 1997 04 10 08 07 14 7.0 -9 670.10 -50.9 -50.8 -51.0 64 -99 SPO 1997 04 10 08 08 16 6.3 -9 670.10 -50.9 -50.9 -51.0 63 -99 SPO 1997 04 10 08 09 18 6.1 -9 670.10 -50.9 -51.0 -51.1 63 -99 SPO 1997 04 10 08 10 19 6.1 -9 670.20 -51.0 -51.1 -51.1 63 -99 SPO 1997 04 10 08 11 20 5.5 -9 670.20 -51.0 -51.1 -51.2 63 -99 SPO 1997 04 10 08 12 22 5.3 -9 670.20 -51.0 -51.1 -51.2 63 -99 SPO 1997 04 10 08 13 19 5.9 -9 670.20 -51.1 -51.1 -51.2 65 -99 SPO 1997 04 10 08 14 14 6.4 -9 670.20 -51.1 -51.0 -51.1 65 -99 SPO 1997 04 10 08 15 14 6.6 -9 670.10 -51.1 -51.0 -51.2 65 -99 SPO 1997 04 10 08 16 14 6.8 -9 670.10 -51.1 -51.1 -51.2 65 -99 SPO 1997 04 10 08 17 15 6.6 -9 670.10 -51.1 -51.1 -51.2 64 -99 SPO 1997 04 10 08 18 15 6.4 -9 670.20 -51.2 -51.1 -51.3 65 -99 SPO 1997 04 10 08 19 18 6.2 -9 670.20 -51.2 -51.1 -51.4 63 -99 SPO 1997 04 10 08 20 20 6.2 -9 670.20 -51.2 -51.1 -51.4 63 -99 SPO 1997 04 10 08 21 20 6.0 -9 670.20 -51.2 -51.2 -51.4 63 -99 SPO 1997 04 10 08 22 20 6.0 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 23 20 5.9 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 24 21 5.8 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 25 20 5.5 -9 670.30 -51.3 -51.2 -51.5 63 -99 SPO 1997 04 10 08 26 20 5.7 -9 670.30 -51.4 -51.2 -51.5 64 -99 SPO 1997 04 10 08 27 21 5.8 -9 670.30 -51.4 -51.3 -51.5 64 -99 SPO 1997 04 10 08 28 20 5.9 -9 670.30 -51.4 -51.3 -51.5 63 -99 SPO 1997 04 10 08 29 20 5.9 -9 670.30 -51.4 -51.4 -51.6 64 -99 SPO 1997 04 10 08 30 20 5.9 -9 670.20 -51.5 -51.4 -51.6 64 -99 SPO 1997 04 10 08 31 19 5.7 -9 670.20 -51.5 -51.4 -51.6 63 -99 SPO 1997 04 10 08 32 19 5.9 -9 670.20 -51.6 -51.4 -51.7 63 -99 SPO 1997 04 10 08 33 17 6.0 -9 670.20 -51.6 -51.4 -51.6 63 -99 SPO 1997 04 10 08 34 16 6.5 -9 670.20 -51.6 -51.4 -51.6 63 -99 SPO 1997 04 10 08 35 17 6.2 -9 670.20 -51.6 -51.4 -51.7 62 -99 SPO 1997 04 10 08 36 16 6.3 -9 670.20 -51.6 -51.4 -51.7 63 -99 SPO 1997 04 10 08 37 17 6.1 -9 670.20 -51.6 -51.4 -51.8 63 -99 SPO 1997 04 10 08 38 17 5.8 -9 670.20 -51.7 -51.5 -51.8 63 -99 SPO 1997 04 10 08 39 16 6.1 -9 670.20 -51.7 -51.5 -51.9 63 -99 SPO 1997 04 10 08 40 15 5.9 -9 670.20 -51.8 -51.4 -51.8 63 -99 SPO 1997 04 10 08 41 14 6.5 -9 670.20 -51.8 -51.4 -51.8 64 -99 SPO 1997 04 10 08 42 13 6.8 -9 670.20 -51.7 -51.4 -51.7 63 -99 SPO 1997 04 10 08 43 13 7.0 -9 670.20 -51.7 -51.4 -51.8 63 -99 SPO 1997 04 10 08 44 13 6.5 -9 670.20 -51.7 -51.5 -51.8 63 -99 SPO 1997 04 10 08 45 12 6.5 -9 670.10 -51.7 -51.6 -51.9 63 -99 SPO 1997 04 10 08 46 10 6.5 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 47 10 6.8 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 48 9 6.8 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 49 10 7.3 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 50 9 7.4 -9 670.10 -51.8 -51.5 -51.8 63 -99 SPO 1997 04 10 08 51 9 7.4 -9 670.10 -51.9 -51.6 -51.9 64 -99 SPO 1997 04 10 08 52 8 7.0 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 53 9 7.3 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 54 8 7.0 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 55 8 7.3 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 56 9 7.4 -9 670.00 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 57 9 7.3 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 58 9 7.2 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 59 9 6.8 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 09 00 10 6.5 -9 670.10 -51.9 -51.7 -52.0 62 0 SPO 1997 04 10 09 01 12 6.4 -9 670.10 -52.0 -51.7 -52.1 63 -99 SPO 1997 04 10 09 02 12 6.0 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 03 11 6.0 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 04 12 5.9 -9 670.20 -52.1 -51.9 -52.2 64 -99 SPO 1997 04 10 09 05 13 6.0 -9 670.20 -52.1 -51.9 -52.2 64 -99 SPO 1997 04 10 09 06 12 6.0 -9 670.10 -52.1 -51.9 -52.3 63 -99 SPO 1997 04 10 09 07 12 6.3 -9 670.10 -52.1 -51.9 -52.2 63 -99 SPO 1997 04 10 09 08 11 6.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 09 10 6.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 10 11 7.0 -9 670.10 -52.0 -51.8 -52.1 62 -99 SPO 1997 04 10 09 11 10 7.3 -9 670.10 -52.0 -51.8 -52.0 63 -99 SPO 1997 04 10 09 12 10 7.5 -9 670.10 -52.0 -51.8 -52.0 64 -99 SPO 1997 04 10 09 13 10 7.5 -9 670.10 -52.0 -51.8 -52.0 64 -99 SPO 1997 04 10 09 14 11 7.3 -9 670.10 -52.0 -51.7 -52.1 64 -99 SPO 1997 04 10 09 15 12 7.2 -9 670.10 -52.0 -51.8 -52.1 64 -99 SPO 1997 04 10 09 16 13 7.1 -9 670.10 -52.0 -51.8 -52.2 64 -99 SPO 1997 04 10 09 17 14 6.8 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 18 15 6.9 -9 670.10 -52.1 -51.8 -52.3 63 -99 SPO 1997 04 10 09 19 16 6.9 -9 670.10 -52.1 -51.8 -52.3 62 -99 SPO 1997 04 10 09 20 15 7.4 -9 670.10 -52.2 -51.8 -52.2 62 -99 SPO 1997 04 10 09 21 12 7.8 -9 670.10 -52.1 -51.8 -52.2 62 -99 SPO 1997 04 10 09 22 13 7.7 -9 670.10 -52.1 -51.8 -52.1 62 -99 SPO 1997 04 10 09 23 12 7.6 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 24 13 7.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 25 13 7.5 -9 670.10 -52.1 -51.9 -52.2 63 -99 SPO 1997 04 10 09 26 15 7.2 -9 670.10 -52.1 -51.9 -52.3 63 -99 SPO 1997 04 10 09 27 16 7.0 -9 670.20 -52.2 -51.9 -52.4 64 -99 SPO 1997 04 10 09 28 17 6.8 -9 670.20 -52.2 -51.9 -52.4 63 -99 SPO 1997 04 10 09 29 17 6.6 -9 670.20 -52.2 -52.0 -52.4 63 -99 SPO 1997 04 10 09 30 17 6.3 -9 670.20 -52.3 -52.0 -52.5 63 -99 SPO 1997 04 10 09 31 18 6.1 -9 670.20 -52.4 -52.0 -52.5 63 -99 SPO 1997 04 10 09 32 20 5.9 -9 670.20 -52.4 -52.0 -52.6 62 -99 SPO 1997 04 10 09 33 20 5.7 -9 670.30 -52.5 -52.0 -52.6 62 -99 SPO 1997 04 10 09 34 21 6.0 -9 670.30 -52.5 -52.0 -52.5 62 -99 SPO 1997 04 10 09 35 21 5.9 -9 670.30 -52.5 -52.0 -52.5 62 -99 SPO 1997 04 10 09 36 23 5.6 -9 670.40 -52.4 -52.1 -52.5 62 -99 SPO 1997 04 10 09 37 23 5.2 -9 670.40 -52.5 -52.2 -52.6 62 -99 SPO 1997 04 10 09 38 24 4.9 -9 670.40 -52.6 -52.3 -52.7 63 -99 SPO 1997 04 10 09 39 25 4.8 -9 670.40 -52.6 -52.3 -52.8 62 -99 SPO 1997 04 10 09 40 25 4.5 -9 670.40 -52.6 -52.4 -52.8 62 -99 SPO 1997 04 10 09 41 26 4.6 -9 670.40 -52.7 -52.4 -52.9 62 -99 SPO 1997 04 10 09 42 24 4.8 -9 670.40 -52.8 -52.4 -52.9 62 -99 SPO 1997 04 10 09 43 22 5.2 -9 670.40 -52.8 -52.4 -52.8 62 -99 SPO 1997 04 10 09 44 21 5.5 -9 670.40 -52.8 -52.4 -52.8 62 -99 SPO 1997 04 10 09 45 21 5.7 -9 670.40 -52.7 -52.4 -52.7 62 -99 SPO 1997 04 10 09 46 21 5.6 -9 670.40 -52.7 -52.4 -52.8 62 -99 SPO 1997 04 10 09 47 22 5.5 -9 670.40 -52.8 -52.4 -52.8 63 -99 SPO 1997 04 10 09 48 23 5.3 -9 670.40 -52.8 -52.4 -52.9 63 -99 SPO 1997 04 10 09 49 24 5.1 -9 670.40 -52.8 -52.5 -53.0 63 -99 SPO 1997 04 10 09 50 24 5.1 -9 670.40 -52.9 -52.5 -53.0 63 -99 SPO 1997 04 10 09 51 23 5.0 -9 670.40 -52.9 -52.5 -53.1 63 -99 SPO 1997 04 10 09 52 24 5.2 -9 670.40 -53.0 -52.5 -53.1 63 -99 SPO 1997 04 10 09 53 24 5.2 -9 670.40 -53.0 -52.4 -53.0 62 -99 SPO 1997 04 10 09 54 24 5.3 -9 670.40 -53.0 -52.5 -53.0 62 -99 SPO 1997 04 10 09 55 22 5.6 -9 670.40 -52.9 -52.5 -53.0 61 -99 SPO 1997 04 10 09 56 21 5.5 -9 670.30 -52.9 -52.6 -53.0 62 -99 SPO 1997 04 10 09 57 19 5.3 -9 670.30 -52.9 -52.6 -53.0 62 -99 SPO 1997 04 10 09 58 19 5.6 -9 670.30 -52.9 -52.6 -53.0 63 -99 SPO 1997 04 10 09 59 19 5.5 -9 670.30 -52.9 -52.5 -53.0 63 -99 SPO 1997 04 10 10 00 18 5.8 -9 670.30 -52.8 -52.5 -52.8 62 0 SPO 1997 04 10 10 01 18 5.8 -9 670.30 -52.8 -52.5 -52.8 63 -99 SPO 1997 04 10 10 02 18 5.8 -9 670.30 -52.8 -52.5 -52.8 63 -99 SPO 1997 04 10 10 03 16 5.7 -9 670.30 -52.8 -52.5 -52.8 64 -99 SPO 1997 04 10 10 04 16 5.5 -9 670.30 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 10 05 17 5.3 -9 670.40 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 10 06 18 5.0 -9 670.40 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 07 19 5.0 -9 670.40 -52.7 -52.5 -52.9 62 -99 SPO 1997 04 10 10 08 21 5.0 -9 670.40 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 09 21 4.7 -9 670.30 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 10 19 5.5 -9 670.30 -52.7 -52.4 -52.8 62 -99 SPO 1997 04 10 10 11 20 4.9 -9 670.30 -52.7 -52.4 -52.7 63 -99 SPO 1997 04 10 10 12 19 4.7 -9 670.30 -52.6 -52.4 -52.8 62 -99 SPO 1997 04 10 10 13 18 4.7 -9 670.30 -52.7 -52.5 -52.8 64 -99 SPO 1997 04 10 10 14 17 4.8 -9 670.30 -52.7 -52.5 -52.8 64 -99 SPO 1997 04 10 10 15 18 4.5 -9 670.30 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 10 16 16 4.8 -9 670.40 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 10 17 13 5.5 -9 670.40 -52.6 -52.4 -52.6 63 -99 SPO 1997 04 10 10 18 11 5.6 -9 670.30 -52.5 -52.4 -52.5 62 -99 SPO 1997 04 10 10 19 10 6.0 -9 670.30 -52.5 -52.3 -52.5 63 -99 SPO 1997 04 10 10 20 11 5.9 -9 670.30 -52.4 -52.3 -52.4 62 -99 SPO 1997 04 10 10 21 12 5.8 -9 670.30 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 22 14 5.3 -9 670.40 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 23 15 5.8 -9 670.40 -52.3 -52.3 -52.4 64 -99 SPO 1997 04 10 10 24 16 5.3 -9 670.40 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 10 10 25 17 5.4 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 26 15 5.3 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 27 16 5.4 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 28 14 5.5 -9 670.40 -52.3 -52.2 -52.4 63 -99 SPO 1997 04 10 10 29 15 5.5 -9 670.40 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 30 14 5.3 -9 670.40 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 31 13 5.6 -9 670.40 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 32 13 5.5 -9 670.30 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 33 12 6.5 -9 670.30 -52.3 -52.2 -52.4 63 -99 SPO 1997 04 10 10 34 12 6.3 -9 670.30 -52.2 -52.2 -52.3 62 -99 SPO 1997 04 10 10 35 12 6.6 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 36 12 6.4 -9 670.20 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 37 11 6.7 -9 670.20 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 38 13 6.6 -9 670.20 -52.2 -52.2 -52.2 65 -99 SPO 1997 04 10 10 39 13 6.2 -9 670.20 -52.1 -52.2 -52.2 64 -99 SPO 1997 04 10 10 40 15 6.0 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 41 16 5.8 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 42 19 6.1 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 43 19 5.8 -9 670.30 -52.2 -52.2 -52.2 63 -99 SPO 1997 04 10 10 44 17 5.7 -9 670.30 -52.2 -52.2 -52.3 62 -99 SPO 1997 04 10 10 45 18 5.9 -9 670.30 -52.2 -52.1 -52.2 63 -99 SPO 1997 04 10 10 46 16 6.2 -9 670.30 -52.1 -52.1 -52.2 62 -99 SPO 1997 04 10 10 47 14 6.1 -9 670.30 -52.1 -52.2 -52.2 63 -99 SPO 1997 04 10 10 48 15 6.6 -9 670.30 -52.1 -52.2 -52.2 63 -99 SPO 1997 04 10 10 49 14 6.5 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 50 13 6.1 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 51 11 6.4 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 52 12 6.4 -9 670.30 -52.2 -52.3 -52.3 63 -99 SPO 1997 04 10 10 53 12 6.3 -9 670.30 -52.2 -52.2 -52.2 63 -99 SPO 1997 04 10 10 54 12 6.5 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 55 13 6.3 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 56 13 6.6 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 57 14 6.4 -9 670.30 -52.2 -52.3 -52.3 64 -99 SPO 1997 04 10 10 58 13 6.1 -9 670.30 -52.2 -52.2 -52.4 64 -99 SPO 1997 04 10 10 59 13 6.1 -9 670.30 -52.2 -52.3 -52.4 64 -99 SPO 1997 04 10 11 00 13 5.9 -9 670.30 -52.3 -52.3 -52.4 65 0 SPO 1997 04 10 11 01 15 5.8 -9 670.30 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 11 02 17 6.0 -9 670.30 -52.3 -52.3 -52.5 64 -99 SPO 1997 04 10 11 03 18 5.9 -9 670.30 -52.4 -52.3 -52.5 65 -99 SPO 1997 04 10 11 04 18 5.5 -9 670.30 -52.4 -52.3 -52.5 64 -99 SPO 1997 04 10 11 05 16 5.6 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 06 15 6.0 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 07 16 6.3 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 08 15 6.0 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 09 14 6.6 -9 670.20 -52.4 -52.4 -52.5 63 -99 SPO 1997 04 10 11 10 14 6.5 -9 670.20 -52.4 -52.4 -52.5 63 -99 SPO 1997 04 10 11 11 14 6.4 -9 670.20 -52.5 -52.5 -52.5 65 -99 SPO 1997 04 10 11 12 13 6.4 -9 670.20 -52.5 -52.5 -52.6 65 -99 SPO 1997 04 10 11 13 12 6.3 -9 670.20 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 11 14 13 6.8 -9 670.20 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 11 15 13 6.6 -9 670.20 -52.5 -52.4 -52.6 64 -99 SPO 1997 04 10 11 16 13 6.3 -9 670.20 -52.5 -52.5 -52.6 63 -99 SPO 1997 04 10 11 17 14 6.4 -9 670.20 -52.6 -52.5 -52.8 63 -99 SPO 1997 04 10 11 18 14 6.4 -9 670.20 -52.6 -52.5 -52.7 62 -99 SPO 1997 04 10 11 19 14 6.2 -9 670.20 -52.6 -52.5 -52.8 62 -99 SPO 1997 04 10 11 20 14 6.5 -9 670.20 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 11 21 14 6.4 -9 670.20 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 11 22 14 6.7 -9 670.20 -52.7 -52.5 -52.7 63 -99 SPO 1997 04 10 11 23 13 6.4 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 24 12 6.4 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 25 11 6.5 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 26 11 6.4 -9 670.20 -52.7 -52.7 -52.8 64 -99 SPO 1997 04 10 11 27 12 6.6 -9 670.20 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 28 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 29 12 6.3 -9 670.10 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 11 30 13 6.6 -9 670.10 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 11 31 13 6.6 -9 670.10 -52.8 -52.7 -52.8 63 -99 SPO 1997 04 10 11 32 12 7.1 -9 670.10 -52.8 -52.7 -52.8 63 -99 SPO 1997 04 10 11 33 12 6.9 -9 670.00 -52.7 -52.6 -52.8 63 -99 SPO 1997 04 10 11 34 12 6.8 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 35 12 6.6 -9 670.00 -52.8 -52.7 -52.9 64 -99 SPO 1997 04 10 11 36 12 7.0 -9 670.00 -52.8 -52.6 -52.9 64 -99 SPO 1997 04 10 11 37 12 7.1 -9 670.00 -52.8 -52.7 -52.8 64 -99 SPO 1997 04 10 11 38 11 6.9 -9 670.00 -52.8 -52.6 -52.8 64 -99 SPO 1997 04 10 11 39 12 7.5 -9 670.00 -52.8 -52.6 -52.8 64 -99 SPO 1997 04 10 11 40 12 7.4 -9 670.00 -52.7 -52.6 -52.8 62 -99 SPO 1997 04 10 11 41 12 7.2 -9 670.00 -52.7 -52.7 -52.9 62 -99 SPO 1997 04 10 11 42 12 7.3 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 43 13 7.0 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 44 14 7.2 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 45 14 6.9 -9 670.00 -52.8 -52.8 -53.0 63 -99 SPO 1997 04 10 11 46 16 7.0 -9 670.10 -52.8 -52.8 -53.0 63 -99 SPO 1997 04 10 11 47 16 7.4 -9 670.00 -52.9 -52.8 -53.0 64 -99 SPO 1997 04 10 11 48 15 7.1 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 49 15 7.5 -9 670.00 -52.9 -52.8 -53.0 64 -99 SPO 1997 04 10 11 50 15 7.5 -9 670.00 -52.9 -52.8 -52.9 63 -99 SPO 1997 04 10 11 51 16 6.9 -9 670.00 -52.8 -52.8 -53.0 62 -99 SPO 1997 04 10 11 52 18 6.8 -9 670.00 -52.9 -52.9 -53.0 63 -99 SPO 1997 04 10 11 53 18 6.5 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 54 17 6.4 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 55 18 6.5 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 56 16 6.4 -9 670.00 -52.9 -52.8 -53.0 62 -99 SPO 1997 04 10 11 57 15 6.9 -9 670.00 -52.9 -52.8 -53.0 62 -99 SPO 1997 04 10 11 58 14 6.8 -9 670.00 -52.9 -52.8 -52.9 63 -99 SPO 1997 04 10 11 59 14 7.0 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 00 15 6.8 -9 670.00 -52.8 -52.9 -52.9 63 0 SPO 1997 04 10 12 01 14 6.9 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 02 15 7.0 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 03 15 6.7 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 04 16 6.4 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 05 16 6.5 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 06 16 6.5 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 07 16 6.8 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 08 15 6.9 -9 670.00 -52.8 -52.8 -52.8 63 -99 SPO 1997 04 10 12 09 13 7.0 -9 670.00 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 12 10 12 7.4 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 11 12 7.2 -9 670.00 -52.7 -52.7 -52.7 64 -99 SPO 1997 04 10 12 12 11 7.7 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 12 13 11 7.8 -9 670.00 -52.6 -52.6 -52.6 63 -99 SPO 1997 04 10 12 14 10 7.8 -9 670.00 -52.6 -52.6 -52.6 63 -99 SPO 1997 04 10 12 15 10 7.5 -9 670.00 -52.5 -52.7 -52.6 62 -99 SPO 1997 04 10 12 16 9 7.3 -9 670.00 -52.6 -52.7 -52.6 63 -99 SPO 1997 04 10 12 17 9 7.3 -9 670.00 -52.6 -52.8 -52.7 62 -99 SPO 1997 04 10 12 18 10 7.6 -9 670.00 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 12 19 10 7.2 -9 670.00 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 12 20 11 7.4 -9 670.00 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 12 21 12 7.0 -9 670.00 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 12 22 12 7.1 -9 670.00 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 12 23 13 6.9 -9 670.00 -52.7 -52.8 -52.8 65 -99 SPO 1997 04 10 12 24 13 7.0 -9 670.00 -52.7 -52.8 -52.8 64 -99 SPO 1997 04 10 12 25 14 6.9 -9 670.00 -52.7 -52.7 -52.8 64 -99 SPO 1997 04 10 12 26 14 7.3 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 27 14 7.3 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 28 14 7.2 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 29 14 7.0 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 30 14 6.7 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 31 15 6.8 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 32 15 6.8 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 33 13 6.6 -9 670.00 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 12 34 14 6.8 -9 670.10 -52.8 -52.8 -52.9 64 -99 SPO 1997 04 10 12 35 13 6.9 -9 670.10 -52.7 -52.8 -52.9 63 -99 SPO 1997 04 10 12 36 13 7.0 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 37 12 6.6 -9 670.00 -52.7 -52.7 -52.7 63 -99 SPO 1997 04 10 12 38 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 39 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 40 12 6.6 -9 670.10 -52.7 -52.7 -52.7 63 -99 SPO 1997 04 10 12 41 13 6.5 -9 670.10 -52.7 -52.6 -52.7 63 -99 SPO 1997 04 10 12 42 14 6.6 -9 670.00 -52.7 -52.6 -52.7 64 -99 SPO 1997 04 10 12 43 15 6.5 -9 670.00 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 12 44 16 6.3 -9 670.10 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 12 45 16 6.5 -9 670.10 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 12 46 15 6.4 -9 670.10 -52.6 -52.5 -52.6 64 -99 SPO 1997 04 10 12 47 15 6.7 -9 670.10 -52.6 -52.5 -52.6 64 -99 SPO 1997 04 10 12 48 15 6.7 -9 670.10 -52.5 -52.4 -52.6 63 -99 SPO 1997 04 10 12 49 14 6.7 -9 670.10 -52.5 -52.4 -52.6 63 -99 SPO 1997 04 10 12 50 14 7.0 -9 670.10 -52.5 -52.4 -52.5 63 -99 SPO 1997 04 10 12 51 13 7.0 -9 670.10 -52.5 -52.5 -52.5 63 -99 SPO 1997 04 10 12 52 15 6.6 -9 670.10 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 12 53 13 7.1 -9 670.10 -52.5 -52.5 -52.5 64 -99 SPO 1997 04 10 12 54 13 6.7 -9 670.10 -52.4 -52.5 -52.5 63 -99 SPO 1997 04 10 12 55 13 6.7 -9 670.10 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 12 56 14 7.0 -9 670.10 -52.5 -52.4 -52.5 65 -99 SPO 1997 04 10 12 57 16 6.5 -9 670.10 -52.5 -52.4 -52.6 65 -99 SPO 1997 04 10 12 58 17 6.6 -9 670.10 -52.5 -52.4 -52.6 65 -99 SPO 1997 04 10 12 59 17 7.0 -9 670.00 -52.5 -52.4 -52.5 65 -99 SPO 1997 04 10 13 00 14 7.2 -9 670.00 -52.4 -52.4 -52.5 63 0 SPO 1997 04 10 13 01 12 7.7 -9 670.00 -52.4 -52.4 -52.4 64 -99 SPO 1997 04 10 13 02 11 7.6 -9 670.00 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 03 11 7.5 -9 670.00 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 04 11 7.3 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 05 12 6.9 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 06 11 7.3 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 07 12 6.7 -9 670.10 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 08 13 6.8 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 09 13 6.9 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 10 12 7.1 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 11 11 7.3 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 12 10 7.3 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 13 11 7.3 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 14 11 7.2 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 15 11 7.0 -9 670.00 -52.3 -52.4 -52.5 63 -99 SPO 1997 04 10 13 16 11 7.5 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 17 11 7.5 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 18 11 6.9 -9 670.00 -52.3 -52.4 -52.5 64 -99 SPO 1997 04 10 13 19 11 7.2 -9 670.00 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 10 13 20 12 7.0 -9 670.00 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 10 13 21 13 7.2 -9 670.00 -52.4 -52.4 -52.5 64 -99 SPO 1997 04 10 13 22 11 7.1 -9 670.00 -52.4 -52.4 -52.6 64 -99 SPO 1997 04 10 13 23 11 7.0 -9 670.00 -52.4 -52.4 -52.6 64 -99 SPO 1997 04 10 13 24 11 7.0 -9 670.10 -52.4 -52.4 -52.6 63 -99 SPO 1997 04 10 13 25 10 7.0 -9 670.10 -52.4 -52.5 -52.6 62 -99 SPO 1997 04 10 13 26 10 7.2 -9 670.10 -52.5 -52.5 -52.6 63 -99 SPO 1997 04 10 13 27 10 7.1 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 28 11 7.0 -9 670.10 -52.5 -52.6 -52.6 62 -99 SPO 1997 04 10 13 29 11 6.8 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 30 12 6.9 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 31 12 7.2 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 32 12 6.9 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 33 11 7.3 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 34 12 7.5 -9 670.10 -52.5 -52.6 -52.5 64 -99 SPO 1997 04 10 13 35 13 7.3 -9 670.10 -52.5 -52.6 -52.5 63 -99 SPO 1997 04 10 13 36 12 7.3 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 37 11 7.2 -9 670.10 -52.4 -52.6 -52.6 63 -99 SPO 1997 04 10 13 38 10 7.0 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 39 10 7.8 -9 670.00 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 40 8 7.8 -9 670.00 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 13 41 8 7.7 -9 670.00 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 13 42 5 8.4 -9 670.00 -52.4 -52.5 -52.6 63 -99 SPO 1997 04 10 13 43 5 7.9 -9 670.00 -52.5 -52.6 -52.5 65 -99 SPO 1997 04 10 13 44 5 8.2 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 45 5 8.3 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 46 5 7.5 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 47 6 7.8 -9 670.00 -52.5 -52.7 -52.6 63 -99 SPO 1997 04 10 13 48 7 7.1 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 13 49 8 6.7 -9 670.00 -52.6 -52.7 -52.8 62 -99 SPO 1997 04 10 13 50 10 7.0 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 13 51 9 7.2 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 13 52 9 7.1 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 13 53 9 7.0 -9 670.00 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 13 54 10 6.9 -9 670.00 -52.6 -52.7 -52.7 64 -99 SPO 1997 04 10 13 55 10 6.9 -9 670.00 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 56 10 7.0 -9 670.10 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 57 10 7.0 -9 670.10 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 58 9 7.5 -9 670.10 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 13 59 10 7.1 -9 670.00 -52.6 -52.6 -52.6 62 -99 SPO 1997 04 10 14 00 10 6.9 -9 670.00 -52.6 -52.7 -52.7 62 0 SPO 1997 04 10 14 01 9 7.0 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 14 02 9 7.3 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 14 03 10 7.0 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 14 04 11 7.2 -9 670.10 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 14 05 10 6.6 -9 670.10 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 14 06 11 6.5 -9 670.10 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 14 07 11 6.9 -9 670.10 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 14 08 11 6.7 -9 670.20 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 14 09 12 6.5 -9 670.20 -52.7 -52.8 -52.8 65 -99 SPO 1997 04 10 14 10 12 7.1 -9 670.20 -52.7 -52.8 -52.8 64 -99 SPO 1997 04 10 14 11 12 6.8 -9 670.10 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 14 12 12 6.8 -9 670.10 -52.7 -52.8 -52.9 63 -99 SPO 1997 04 10 14 13 13 6.6 -9 670.10 -52.7 -52.8 -52.8 62 -99 SPO 1997 04 10 14 14 13 6.3 -9 670.10 -52.7 -52.8 -52.9 62 -99 SPO 1997 04 10 14 15 12 6.3 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 16 12 6.1 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 17 10 7.0 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 18 12 6.4 -9 670.10 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 14 19 12 6.3 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 20 13 6.9 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 21 12 6.1 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 22 13 6.3 -9 670.10 -52.8 -53.0 -53.0 62 -99 SPO 1997 04 10 14 23 13 6.5 -9 670.00 -52.9 -53.0 -53.0 63 -99 SPO 1997 04 10 14 24 12 6.5 -9 670.00 -52.9 -53.0 -53.0 63 -99 SPO 1997 04 10 14 25 14 6.1 -9 670.00 -52.9 -53.0 -53.0 62 -99 SPO 1997 04 10 14 26 14 6.1 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 27 14 6.5 -9 670.00 -53.0 -53.0 -53.1 63 -99 SPO 1997 04 10 14 28 14 6.8 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 29 11 6.8 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 30 10 7.7 -9 670.00 -53.0 -53.0 -53.0 64 -99 SPO 1997 04 10 14 31 11 7.5 -9 670.00 -53.0 -53.0 -53.0 64 -99 SPO 1997 04 10 14 32 10 7.5 -9 670.00 -53.0 -53.0 -53.1 64 -99 SPO 1997 04 10 14 33 10 7.1 -9 670.00 -53.0 -53.0 -53.1 63 -99 SPO 1997 04 10 14 34 11 7.2 -9 670.00 -53.0 -53.0 -53.2 62 -99 SPO 1997 04 10 14 35 12 7.5 -9 670.00 -53.0 -53.0 -53.2 61 -99 SPO 1997 04 10 14 36 12 7.9 -9 670.00 -53.1 -53.1 -53.2 62 -99 SPO 1997 04 10 14 37 11 7.9 -9 670.00 -53.1 -53.1 -53.2 61 -99 SPO 1997 04 10 14 38 12 7.4 -9 669.90 -53.1 -53.1 -53.2 62 -99 SPO 1997 04 10 14 39 12 7.1 -9 669.90 -53.1 -53.2 -53.3 62 -99 SPO 1997 04 10 14 40 12 7.2 -9 669.90 -53.2 -53.2 -53.4 64 -99 SPO 1997 04 10 14 41 12 7.5 -9 669.90 -53.2 -53.2 -53.4 63 -99 SPO 1997 04 10 14 42 12 7.7 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 43 12 7.7 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 44 11 7.9 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 45 11 7.9 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 46 10 8.1 -9 669.80 -53.3 -53.2 -53.4 63 -99 SPO 1997 04 10 14 47 11 7.9 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 48 10 8.5 -9 669.70 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 49 10 8.2 -9 669.80 -53.4 -53.2 -53.5 62 -99 SPO 1997 04 10 14 50 9 8.2 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 51 9 8.2 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 52 9 8.3 -9 669.80 -53.4 -53.3 -53.6 62 -99 SPO 1997 04 10 14 53 10 7.9 -9 669.80 -53.4 -53.4 -53.6 62 -99 SPO 1997 04 10 14 54 9 7.7 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 55 9 7.5 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 56 9 7.7 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 57 10 7.7 -9 669.80 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 14 58 9 7.8 -9 669.80 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 14 59 8 7.7 -9 669.80 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 15 00 8 8.1 -9 669.70 -53.6 -53.4 -53.6 63 0 SPO 1997 04 10 15 01 8 8.2 -9 669.70 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 15 02 8 8.1 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 03 9 7.9 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 04 10 7.9 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 05 9 8.0 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 06 9 8.2 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 07 8 8.2 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 08 7 8.4 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 09 7 8.4 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 10 6 8.3 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 11 6 7.8 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 12 6 8.2 -9 669.60 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 15 13 7 8.2 -9 669.60 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 14 7 7.9 -9 669.60 -53.5 -53.5 -53.6 64 -99 SPO 1997 04 10 15 15 8 7.9 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 16 9 7.9 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 17 9 8.0 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 18 9 8.4 -9 669.50 -53.6 -53.5 -53.6 64 -99 SPO 1997 04 10 15 19 8 8.4 -9 669.50 -53.6 -53.5 -53.6 63 -99 SPO 1997 04 10 15 20 8 8.7 -9 669.50 -53.6 -53.5 -53.6 63 -99 SPO 1997 04 10 15 21 8 8.5 -9 669.50 -53.5 -53.5 -53.6 62 -99 SPO 1997 04 10 15 22 8 8.8 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 23 8 9.0 -9 669.50 -53.5 -53.5 -53.6 62 -99 SPO 1997 04 10 15 24 8 8.6 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 25 7 8.4 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 26 8 8.6 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 27 8 8.4 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 28 8 8.5 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 29 9 8.5 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 30 9 8.3 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 31 10 8.2 -9 669.50 -53.6 -53.7 -53.6 64 -99 SPO 1997 04 10 15 32 10 8.4 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 33 10 8.4 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 34 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 35 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 36 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 37 11 8.4 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 38 11 8.4 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 39 11 8.5 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 40 11 8.3 -9 669.50 -53.7 -53.7 -53.8 64 -99 SPO 1997 04 10 15 41 11 8.4 -9 669.50 -53.7 -53.7 -53.8 64 -99 SPO 1997 04 10 15 42 12 8.3 -9 669.50 -53.7 -53.7 -53.8 63 -99 SPO 1997 04 10 15 43 12 8.1 -9 669.50 -53.7 -53.7 -53.9 62 -99 SPO 1997 04 10 15 44 11 8.6 -9 669.50 -53.7 -53.7 -53.9 61 -99 SPO 1997 04 10 15 45 11 8.3 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 46 11 8.7 -9 669.50 -53.8 -53.8 -53.8 62 -99 SPO 1997 04 10 15 47 11 8.7 -9 669.50 -53.7 -53.8 -53.8 62 -99 SPO 1997 04 10 15 48 11 8.7 -9 669.50 -53.7 -53.8 -53.8 62 -99 SPO 1997 04 10 15 49 11 9.0 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 50 11 8.5 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 51 12 8.4 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 52 13 8.7 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 53 13 9.0 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 54 13 8.9 -9 669.50 -53.8 -53.8 -53.8 63 -99 SPO 1997 04 10 15 55 12 9.1 -9 669.50 -53.7 -53.8 -53.9 62 -99 SPO 1997 04 10 15 56 11 8.9 -9 669.50 -53.8 -53.8 -53.8 62 -99 SPO 1997 04 10 15 57 11 8.8 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 58 12 8.7 -9 669.60 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 59 12 8.5 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 00 12 8.5 -9 669.60 -53.8 -53.8 -53.9 62 0 SPO 1997 04 10 16 01 13 8.3 -9 669.60 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 02 13 8.4 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 03 13 8.1 -9 669.60 -53.8 -53.9 -53.9 63 -99 SPO 1997 04 10 16 04 13 8.2 -9 669.60 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 16 05 12 8.5 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 06 12 8.5 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 07 11 8.6 -9 669.60 -53.8 -53.9 -54.0 62 -99 SPO 1997 04 10 16 08 11 8.3 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 09 12 8.3 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 10 12 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 11 12 8.5 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 12 12 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 13 13 8.2 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 14 13 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 15 13 8.4 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 16 14 8.3 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 17 13 8.2 -9 669.50 -53.9 -53.9 -54.0 62 -99 SPO 1997 04 10 16 18 13 8.2 -9 669.60 -53.9 -53.9 -54.1 62 -99 SPO 1997 04 10 16 19 13 8.3 -9 669.60 -53.9 -53.9 -54.0 62 -99 SPO 1997 04 10 16 20 12 8.4 -9 669.60 -53.9 -54.0 -54.1 62 -99 SPO 1997 04 10 16 21 12 8.2 -9 669.50 -53.9 -54.0 -54.1 62 -99 SPO 1997 04 10 16 22 12 8.4 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 23 12 8.7 -9 669.50 -54.0 -54.0 -54.1 63 -99 SPO 1997 04 10 16 24 11 8.6 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 25 11 8.5 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 26 10 8.6 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 27 10 8.7 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 28 9 8.7 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 29 10 8.7 -9 669.50 -54.0 -53.8 -54.1 63 -99 SPO 1997 04 10 16 30 10 8.8 -9 669.50 -54.0 -53.8 -54.0 63 -99 SPO 1997 04 10 16 31 11 8.8 -9 669.50 -53.9 -53.8 -54.0 62 -99 SPO 1997 04 10 16 32 11 8.3 -9 669.50 -53.9 -53.8 -54.0 62 -99 SPO 1997 04 10 16 33 10 8.5 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 34 11 8.4 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 35 11 8.2 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 36 10 8.4 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 37 10 8.6 -9 669.50 -53.9 -53.9 -53.9 63 -99 SPO 1997 04 10 16 38 9 8.6 -9 669.50 -53.8 -53.9 -53.9 64 -99 SPO 1997 04 10 16 39 10 8.4 -9 669.50 -53.8 -53.8 -53.9 64 -99 SPO 1997 04 10 16 40 10 8.7 -9 669.50 -53.8 -53.8 -53.9 64 -99 SPO 1997 04 10 16 41 9 9.1 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 42 9 8.3 -9 669.50 -53.8 -53.8 -53.8 63 -99 SPO 1997 04 10 16 43 10 8.4 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 44 9 7.8 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 45 10 7.9 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 46 11 7.9 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 47 11 7.7 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 48 11 7.8 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 49 11 7.6 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 50 11 7.7 -9 669.70 -53.8 -53.8 -54.0 63 -99 SPO 1997 04 10 16 51 10 7.6 -9 669.70 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 52 11 7.6 -9 669.70 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 53 11 7.4 -9 669.70 -53.8 -53.9 -54.0 62 -99 SPO 1997 04 10 16 54 12 7.4 -9 669.70 -53.8 -54.0 -53.9 62 -99 SPO 1997 04 10 16 55 12 7.4 -9 669.70 -53.8 -54.0 -53.9 61 -99 SPO 1997 04 10 16 56 13 7.1 -9 669.70 -53.8 -54.0 -53.9 61 -99 SPO 1997 04 10 16 57 12 7.1 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 16 58 12 7.9 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 16 59 11 7.6 -9 669.70 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 17 00 11 7.6 -9 669.70 -53.9 -54.0 -54.0 63 0 SPO 1997 04 10 17 01 12 7.3 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 02 13 7.1 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 03 13 7.1 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 04 15 7.5 -9 669.70 -53.9 -54.0 -54.0 60 -99 SPO 1997 04 10 17 05 14 7.7 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 06 15 7.2 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 07 17 7.4 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 08 15 7.4 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 09 16 7.8 -9 669.70 -53.9 -54.0 -54.0 60 -99 SPO 1997 04 10 17 10 15 7.8 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 11 14 8.0 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 12 13 8.7 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 13 12 8.4 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 14 12 8.1 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 15 12 8.9 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 16 11 8.5 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 17 12 8.3 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 18 14 8.1 -9 669.60 -53.9 -54.1 -54.0 62 -99 SPO 1997 04 10 17 19 15 7.5 -9 669.60 -53.9 -54.1 -54.0 62 -99 SPO 1997 04 10 17 20 16 7.9 -9 669.60 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 21 14 8.2 -9 669.60 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 22 13 8.6 -9 669.60 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 23 14 8.4 -9 669.60 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 24 13 7.6 -9 669.70 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 25 13 7.7 -9 669.70 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 26 14 7.9 -9 669.70 -53.8 -54.0 -53.9 62 -99 SPO 1997 04 10 17 27 15 7.5 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 28 15 7.3 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 29 16 7.5 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 30 15 7.7 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 31 14 8.3 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 32 15 7.9 -9 669.60 -53.8 -54.1 -54.0 62 -99 SPO 1997 04 10 17 33 15 7.8 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 34 15 7.3 -9 669.70 -53.8 -54.1 -54.0 63 -99 SPO 1997 04 10 17 35 16 6.9 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 36 16 7.2 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 37 14 7.7 -9 669.80 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 38 13 7.1 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 39 12 7.7 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 40 11 7.3 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 41 12 7.4 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 42 12 7.8 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 43 13 7.5 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 44 13 7.3 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 45 11 6.8 -9 669.70 -53.9 -54.2 -54.0 63 -99 SPO 1997 04 10 17 46 10 8.4 -9 669.60 -53.9 -54.2 -54.0 64 -99 SPO 1997 04 10 17 47 9 8.6 -9 669.60 -53.9 -54.1 -54.0 66 -99 SPO 1997 04 10 17 48 9 7.8 -9 669.60 -53.9 -54.1 -54.0 67 -99 SPO 1997 04 10 17 49 11 8.1 -9 669.60 -53.9 -54.1 -54.1 67 -99 SPO 1997 04 10 17 50 11 8.0 -9 669.60 -53.9 -54.1 -54.1 67 -99 SPO 1997 04 10 17 51 13 7.5 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 17 52 14 7.0 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 53 15 8.1 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 54 12 8.8 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 55 9 9.2 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 10 17 56 9 9.6 -9 669.60 -53.9 -54.1 -54.1 66 -99 SPO 1997 04 10 17 57 9 9.0 -9 669.60 -53.9 -54.1 -54.1 66 -99 SPO 1997 04 10 17 58 11 8.3 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 17 59 11 8.5 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 18 00 12 9.2 -9 669.70 -54.0 -54.1 -54.1 67 0 SPO 1997 04 10 18 01 12 8.5 -9 669.70 -54.0 -54.2 -54.0 67 -99 SPO 1997 04 10 18 02 13 8.5 -9 669.70 -54.0 -54.2 -54.0 67 -99 SPO 1997 04 10 18 03 13 8.2 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 04 13 8.6 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 05 14 8.1 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 06 14 9.0 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 07 12 9.6 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 08 13 9.4 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 09 13 8.8 -9 669.60 -54.0 -54.2 -54.1 65 -99 SPO 1997 04 10 18 10 13 8.9 -9 669.60 -54.0 -54.2 -54.2 65 -99 SPO 1997 04 10 18 11 13 9.3 -9 669.60 -54.0 -54.2 -54.1 65 -99 SPO 1997 04 10 18 12 13 8.9 -9 669.60 -54.0 -54.2 -54.1 64 -99 SPO 1997 04 10 18 13 14 8.3 -9 669.60 -54.0 -54.2 -54.2 64 -99 SPO 1997 04 10 18 14 15 8.4 -9 669.60 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 15 15 8.4 -9 669.70 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 16 16 8.4 -9 669.70 -54.0 -54.2 -54.1 63 -99 SPO 1997 04 10 18 17 15 8.2 -9 669.70 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 18 12 8.6 -9 669.70 -54.0 -54.3 -54.1 64 -99 SPO 1997 04 10 18 19 12 9.0 -9 669.60 -54.1 -54.3 -54.1 65 -99 SPO 1997 04 10 18 20 12 9.0 -9 669.60 -54.0 -54.3 -54.2 64 -99 SPO 1997 04 10 18 21 12 8.8 -9 669.60 -54.0 -54.3 -54.2 64 -99 SPO 1997 04 10 18 22 13 8.7 -9 669.60 -54.1 -54.3 -54.2 66 -99 SPO 1997 04 10 18 23 14 8.7 -9 669.70 -54.1 -54.3 -54.2 66 -99 SPO 1997 04 10 18 24 16 8.6 -9 669.70 -54.1 -54.3 -54.2 65 -99 SPO 1997 04 10 18 25 16 8.2 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 26 16 8.6 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 27 14 8.9 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 28 14 9.6 -9 669.70 -54.1 -54.2 -54.2 63 -99 SPO 1997 04 10 18 29 12 9.7 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 30 13 8.8 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 31 13 9.4 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 32 13 9.1 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 33 13 8.9 -9 669.60 -54.1 -54.3 -54.3 64 -99 SPO 1997 04 10 18 34 13 9.9 -9 669.60 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 35 13 9.0 -9 669.60 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 36 13 8.7 -9 669.60 -54.2 -54.4 -54.3 65 -99 SPO 1997 04 10 18 37 13 8.5 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 38 12 8.5 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 39 12 8.7 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 40 12 8.9 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 41 12 8.7 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 42 13 8.8 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 43 14 8.9 -9 669.60 -54.2 -54.3 -54.3 64 -99 SPO 1997 04 10 18 44 16 8.7 -9 669.60 -54.2 -54.4 -54.4 64 -99 SPO 1997 04 10 18 45 15 8.4 -9 669.60 -54.3 -54.4 -54.4 65 -99 SPO 1997 04 10 18 46 15 9.2 -9 669.60 -54.3 -54.4 -54.4 65 -99 SPO 1997 04 10 18 47 14 9.3 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 48 14 8.8 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 49 14 8.8 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 50 14 9.1 -9 669.60 -54.3 -54.4 -54.4 62 -99 SPO 1997 04 10 18 51 13 8.7 -9 669.60 -54.3 -54.5 -54.4 62 -99 SPO 1997 04 10 18 52 15 8.5 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 53 15 8.5 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 54 14 8.6 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 55 15 8.7 -9 669.60 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 18 56 16 8.9 -9 669.60 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 57 16 8.6 -9 669.60 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 58 16 8.4 -9 669.70 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 59 16 8.8 -9 669.60 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 00 18 8.5 -9 669.60 -54.3 -54.5 -54.4 65 0 SPO 1997 04 10 19 01 18 8.4 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 02 17 8.6 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 03 18 8.9 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 04 19 8.4 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 05 18 8.7 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 06 17 8.0 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 07 15 8.7 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 08 14 9.1 -9 669.60 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 09 14 8.5 -9 669.60 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 10 15 9.2 -9 669.50 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 11 14 9.4 -9 669.50 -54.2 -54.6 -54.4 64 -99 SPO 1997 04 10 19 12 14 9.8 -9 669.50 -54.2 -54.6 -54.4 64 -99 SPO 1997 04 10 19 13 14 9.0 -9 669.50 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 14 14 8.8 -9 669.50 -54.3 -54.6 -54.4 63 -99 SPO 1997 04 10 19 15 14 8.7 -9 669.50 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 16 15 9.0 -9 669.50 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 17 14 9.8 -9 669.50 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 18 14 9.2 -9 669.40 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 19 14 9.7 -9 669.40 -54.3 -54.5 -54.5 65 -99 SPO 1997 04 10 19 20 14 9.4 -9 669.50 -54.3 -54.5 -54.5 63 -99 SPO 1997 04 10 19 21 14 9.0 -9 669.50 -54.3 -54.6 -54.5 63 -99 SPO 1997 04 10 19 22 13 9.9 -9 669.40 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 10 19 23 12 9.9 -9 669.40 -54.4 -54.5 -54.5 63 -99 SPO 1997 04 10 19 24 14 9.0 -9 669.50 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 10 19 25 14 9.1 -9 669.60 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 10 19 26 14 8.6 -9 669.60 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 10 19 27 12 9.4 -9 669.60 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 28 14 9.1 -9 669.50 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 29 13 9.7 -9 669.50 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 30 13 9.1 -9 669.60 -54.5 -54.7 -54.6 65 -99 SPO 1997 04 10 19 31 14 9.1 -9 669.60 -54.5 -54.7 -54.6 65 -99 SPO 1997 04 10 19 32 14 9.0 -9 669.50 -54.5 -54.8 -54.6 64 -99 SPO 1997 04 10 19 33 13 10.1 -9 669.50 -54.5 -54.8 -54.6 63 -99 SPO 1997 04 10 19 34 12 9.4 -9 669.50 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 10 19 35 12 9.5 -9 669.40 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 10 19 36 11 9.3 -9 669.40 -54.5 -54.8 -54.7 63 -99 SPO 1997 04 10 19 37 11 9.4 -9 669.50 -54.5 -54.7 -54.7 63 -99 SPO 1997 04 10 19 38 12 8.4 -9 669.50 -54.6 -54.8 -54.7 64 -99 SPO 1997 04 10 19 39 12 8.6 -9 669.50 -54.6 -54.8 -54.7 64 -99 SPO 1997 04 10 19 40 12 9.1 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 41 13 9.0 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 42 11 9.2 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 43 11 8.8 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 44 13 9.1 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 45 12 8.6 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 46 13 8.8 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 47 12 9.0 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 48 11 9.3 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 49 13 8.7 -9 669.50 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 10 19 50 14 8.6 -9 669.50 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 10 19 51 13 9.2 -9 669.50 -54.7 -54.9 -54.8 64 -99 SPO 1997 04 10 19 52 12 9.3 -9 669.50 -54.7 -54.9 -54.8 64 -99 SPO 1997 04 10 19 53 12 9.0 -9 669.60 -54.7 -55.0 -54.8 63 -99 SPO 1997 04 10 19 54 11 9.0 -9 669.60 -54.7 -54.9 -54.9 63 -99 SPO 1997 04 10 19 55 12 8.4 -9 669.60 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 10 19 56 13 8.6 -9 669.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 10 19 57 14 8.7 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 19 58 14 8.6 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 19 59 14 8.3 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 20 00 16 8.6 -9 669.60 -54.8 -55.1 -54.9 62 0 SPO 1997 04 10 20 01 15 8.0 -9 669.60 -54.8 -55.1 -54.9 63 -99 SPO 1997 04 10 20 02 16 7.2 -9 669.60 -54.8 -55.1 -54.9 63 -99 SPO 1997 04 10 20 03 15 8.1 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 04 17 7.8 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 05 17 8.6 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 06 16 8.8 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 07 15 8.7 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 08 16 8.3 -9 669.60 -54.8 -55.1 -55.0 62 -99 SPO 1997 04 10 20 09 17 8.2 -9 669.60 -54.8 -55.1 -55.0 62 -99 SPO 1997 04 10 20 10 17 8.5 -9 669.60 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 10 20 11 16 8.7 -9 669.60 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 10 20 12 17 9.0 -9 669.60 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 10 20 13 15 8.9 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 14 14 8.8 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 15 16 8.8 -9 669.70 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 16 17 8.0 -9 669.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 10 20 17 19 8.7 -9 669.60 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 10 20 18 14 9.5 -9 669.60 -54.8 -55.2 -55.0 63 -99 SPO 1997 04 10 20 19 13 9.0 -9 669.60 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 10 20 20 16 8.8 -9 669.60 -54.9 -55.2 -55.1 63 -99 SPO 1997 04 10 20 21 17 9.2 -9 669.60 -54.9 -55.2 -55.1 62 -99 SPO 1997 04 10 20 22 14 9.4 -9 669.60 -54.9 -55.2 -55.1 62 -99 SPO 1997 04 10 20 23 12 9.9 -9 669.50 -54.9 -55.2 -55.1 62 -99 SPO 1997 04 10 20 24 11 10.0 -9 669.60 -55.0 -55.2 -55.1 64 -99 SPO 1997 04 10 20 25 13 9.4 -9 669.60 -55.0 -55.3 -55.2 64 -99 SPO 1997 04 10 20 26 14 8.9 -9 669.60 -55.0 -55.3 -55.2 64 -99 SPO 1997 04 10 20 27 14 9.5 -9 669.60 -55.0 -55.3 -55.2 64 -99 SPO 1997 04 10 20 28 14 9.9 -9 669.60 -55.0 -55.3 -55.1 64 -99 SPO 1997 04 10 20 29 14 9.7 -9 669.60 -55.0 -55.3 -55.2 64 -99 SPO 1997 04 10 20 30 15 9.0 -9 669.60 -55.0 -55.3 -55.2 63 -99 SPO 1997 04 10 20 31 15 8.8 -9 669.60 -55.0 -55.3 -55.2 62 -99 SPO 1997 04 10 20 32 15 8.3 -9 669.60 -55.0 -55.3 -55.2 62 -99 SPO 1997 04 10 20 33 18 8.1 -9 669.60 -55.1 -55.3 -55.2 63 -99 SPO 1997 04 10 20 34 19 8.2 -9 669.60 -55.0 -55.3 -55.1 62 -99 SPO 1997 04 10 20 35 20 8.3 -9 669.60 -55.0 -55.3 -55.2 62 -99 SPO 1997 04 10 20 36 18 9.0 -9 669.60 -55.0 -55.3 -55.2 63 -99 SPO 1997 04 10 20 37 15 8.5 -9 669.60 -55.1 -55.4 -55.2 64 -99 SPO 1997 04 10 20 38 17 8.3 -9 669.60 -55.1 -55.4 -55.3 64 -99 SPO 1997 04 10 20 39 13 8.6 -9 669.60 -55.1 -55.4 -55.3 63 -99 SPO 1997 04 10 20 40 14 8.9 -9 669.60 -55.1 -55.4 -55.3 63 -99 SPO 1997 04 10 20 41 15 9.1 -9 669.60 -55.2 -55.4 -55.3 63 -99 SPO 1997 04 10 20 42 15 8.8 -9 669.60 -55.2 -55.5 -55.3 62 -99 SPO 1997 04 10 20 43 15 8.7 -9 669.60 -55.2 -55.5 -55.3 62 -99 SPO 1997 04 10 20 44 18 7.8 -9 669.60 -55.2 -55.5 -55.3 62 -99 SPO 1997 04 10 20 45 19 8.6 -9 669.60 -55.2 -55.4 -55.3 62 -99 SPO 1997 04 10 20 46 19 8.6 -9 669.60 -55.2 -55.4 -55.3 62 -99 SPO 1997 04 10 20 47 21 8.3 -9 669.60 -55.2 -55.4 -55.3 62 -99 SPO 1997 04 10 20 48 18 8.3 -9 669.60 -55.2 -55.4 -55.3 62 -99 SPO 1997 04 10 20 49 16 9.1 -9 669.50 -55.2 -55.5 -55.4 62 -99 SPO 1997 04 10 20 50 14 9.3 -9 669.60 -55.3 -55.6 -55.4 63 -99 SPO 1997 04 10 20 51 13 9.7 -9 669.50 -55.3 -55.6 -55.4 64 -99 SPO 1997 04 10 20 52 14 8.9 -9 669.50 -55.3 -55.6 -55.5 64 -99 SPO 1997 04 10 20 53 14 8.7 -9 669.50 -55.3 -55.6 -55.5 63 -99 SPO 1997 04 10 20 54 13 9.2 -9 669.60 -55.3 -55.6 -55.5 62 -99 SPO 1997 04 10 20 55 13 9.3 -9 669.60 -55.3 -55.6 -55.5 62 -99 SPO 1997 04 10 20 56 13 8.5 -9 669.60 -55.4 -55.6 -55.5 62 -99 SPO 1997 04 10 20 57 14 8.5 -9 669.60 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 10 20 58 14 8.4 -9 669.60 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 10 20 59 14 8.5 -9 669.60 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 10 21 00 15 8.0 -9 669.60 -55.4 -55.6 -55.5 63 0 SPO 1997 04 10 21 01 15 8.1 -9 669.60 -55.3 -55.6 -55.5 62 -99 SPO 1997 04 10 21 02 15 8.3 -9 669.60 -55.3 -55.6 -55.4 63 -99 SPO 1997 04 10 21 03 16 9.1 -9 669.60 -55.3 -55.5 -55.4 63 -99 SPO 1997 04 10 21 04 15 8.3 -9 669.60 -55.3 -55.6 -55.4 62 -99 SPO 1997 04 10 21 05 16 8.9 -9 669.60 -55.3 -55.6 -55.5 62 -99 SPO 1997 04 10 21 06 14 8.5 -9 669.60 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 10 21 07 16 8.6 -9 669.60 -55.4 -55.7 -55.5 63 -99 SPO 1997 04 10 21 08 16 8.3 -9 669.60 -55.3 -55.7 -55.5 63 -99 SPO 1997 04 10 21 09 16 8.7 -9 669.60 -55.4 -55.7 -55.5 64 -99 SPO 1997 04 10 21 10 14 8.5 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 11 15 8.7 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 12 15 9.1 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 13 15 9.2 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 14 16 8.9 -9 669.60 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 10 21 15 16 8.6 -9 669.60 -55.4 -55.6 -55.5 62 -99 SPO 1997 04 10 21 16 16 8.8 -9 669.60 -55.4 -55.6 -55.5 62 -99 SPO 1997 04 10 21 17 16 8.9 -9 669.60 -55.4 -55.6 -55.5 62 -99 SPO 1997 04 10 21 18 15 8.6 -9 669.60 -55.3 -55.6 -55.4 62 -99 SPO 1997 04 10 21 19 15 8.6 -9 669.60 -55.3 -55.6 -55.5 62 -99 SPO 1997 04 10 21 20 14 9.5 -9 669.60 -55.3 -55.5 -55.4 62 -99 SPO 1997 04 10 21 21 14 9.2 -9 669.60 -55.3 -55.6 -55.4 62 -99 SPO 1997 04 10 21 22 13 9.2 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 23 12 9.7 -9 669.60 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 24 12 9.3 -9 669.50 -55.3 -55.6 -55.4 64 -99 SPO 1997 04 10 21 25 11 9.3 -9 669.50 -55.3 -55.6 -55.5 64 -99 SPO 1997 04 10 21 26 11 9.9 -9 669.50 -55.3 -55.6 -55.5 64 -99 SPO 1997 04 10 21 27 11 10.3 -9 669.50 -55.4 -55.6 -55.5 65 -99 SPO 1997 04 10 21 28 10 10.3 -9 669.40 -55.4 -55.6 -55.5 65 -99 SPO 1997 04 10 21 29 9 10.5 -9 669.40 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 30 9 9.9 -9 669.30 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 31 8 10.9 -9 669.30 -55.4 -55.6 -55.5 64 -99 SPO 1997 04 10 21 32 8 11.4 -9 669.30 -55.4 -55.6 -55.6 65 -99 SPO 1997 04 10 21 33 9 10.2 -9 669.30 -55.4 -55.6 -55.6 65 -99 SPO 1997 04 10 21 34 10 11.0 -9 669.30 -55.4 -55.6 -55.6 65 -99 SPO 1997 04 10 21 35 11 9.9 -9 669.30 -55.4 -55.6 -55.5 65 -99 SPO 1997 04 10 21 36 11 9.7 -9 669.30 -55.4 -55.6 -55.6 65 -99 SPO 1997 04 10 21 37 12 10.0 -9 669.40 -55.4 -55.6 -55.6 64 -99 SPO 1997 04 10 21 38 13 9.6 -9 669.40 -55.4 -55.6 -55.6 63 -99 SPO 1997 04 10 21 39 12 9.5 -9 669.40 -55.4 -55.7 -55.6 63 -99 SPO 1997 04 10 21 40 10 9.7 -9 669.40 -55.4 -55.7 -55.5 63 -99 SPO 1997 04 10 21 41 9 10.6 -9 669.40 -55.4 -55.7 -55.6 63 -99 SPO 1997 04 10 21 42 8 10.4 -9 669.40 -55.4 -55.7 -55.6 63 -99 SPO 1997 04 10 21 43 8 10.3 -9 669.30 -55.4 -55.7 -55.6 64 -99 SPO 1997 04 10 21 44 8 10.0 -9 669.30 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 10 21 45 8 10.8 -9 669.30 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 10 21 46 8 10.8 -9 669.30 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 10 21 47 8 10.2 -9 669.30 -55.5 -55.7 -55.7 65 -99 SPO 1997 04 10 21 48 8 9.8 -9 669.40 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 10 21 49 8 9.4 -9 669.30 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 10 21 50 9 9.4 -9 669.30 -55.5 -55.8 -55.7 64 -99 SPO 1997 04 10 21 51 8 10.4 -9 669.30 -55.5 -55.7 -55.7 63 -99 SPO 1997 04 10 21 52 7 10.6 -9 669.30 -55.6 -55.7 -55.7 64 -99 SPO 1997 04 10 21 53 8 10.8 -9 669.30 -55.6 -55.7 -55.7 64 -99 SPO 1997 04 10 21 54 10 10.0 -9 669.30 -55.6 -55.7 -55.8 63 -99 SPO 1997 04 10 21 55 10 10.1 -9 669.30 -55.6 -55.8 -55.8 64 -99 SPO 1997 04 10 21 56 11 10.2 -9 669.30 -55.6 -55.8 -55.8 64 -99 SPO 1997 04 10 21 57 10 10.4 -9 669.40 -55.6 -55.8 -55.8 64 -99 SPO 1997 04 10 21 58 11 9.6 -9 669.40 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 10 21 59 11 10.0 -9 669.40 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 10 22 00 10 10.1 -9 669.40 -55.7 -55.9 -55.9 65 0 SPO 1997 04 10 22 01 10 10.4 -9 669.40 -55.7 -55.9 -55.8 64 -99 SPO 1997 04 10 22 02 11 9.5 -9 669.40 -55.7 -55.9 -55.9 63 -99 SPO 1997 04 10 22 03 12 10.1 -9 669.40 -55.8 -55.9 -55.9 64 -99 SPO 1997 04 10 22 04 12 9.5 -9 669.40 -55.8 -55.9 -55.9 64 -99 SPO 1997 04 10 22 05 13 9.6 -9 669.40 -55.8 -55.9 -55.9 64 -99 SPO 1997 04 10 22 06 12 9.6 -9 669.50 -55.7 -55.9 -55.9 63 -99 SPO 1997 04 10 22 07 12 9.3 -9 669.50 -55.8 -55.9 -55.9 64 -99 SPO 1997 04 10 22 08 12 9.6 -9 669.50 -55.8 -55.9 -55.9 65 -99 SPO 1997 04 10 22 09 12 9.5 -9 669.50 -55.8 -55.9 -56.0 64 -99 SPO 1997 04 10 22 10 13 9.3 -9 669.50 -55.8 -55.9 -56.0 64 -99 SPO 1997 04 10 22 11 12 9.1 -9 669.50 -55.8 -55.9 -56.0 64 -99 SPO 1997 04 10 22 12 13 8.8 -9 669.50 -55.9 -56.0 -56.0 64 -99 SPO 1997 04 10 22 13 13 9.0 -9 669.50 -55.9 -56.0 -56.0 64 -99 SPO 1997 04 10 22 14 14 9.0 -9 669.60 -55.9 -56.0 -56.0 64 -99 SPO 1997 04 10 22 15 14 8.5 -9 669.60 -55.9 -56.0 -56.0 63 -99 SPO 1997 04 10 22 16 14 8.7 -9 669.60 -55.9 -56.0 -56.1 63 -99 SPO 1997 04 10 22 17 14 8.5 -9 669.70 -55.9 -56.0 -56.0 64 -99 SPO 1997 04 10 22 18 14 8.4 -9 669.60 -56.0 -56.0 -56.1 65 -99 SPO 1997 04 10 22 19 14 8.5 -9 669.60 -56.0 -56.0 -56.0 65 -99 SPO 1997 04 10 22 20 13 8.7 -9 669.70 -56.0 -56.0 -56.0 65 -99 SPO 1997 04 10 22 21 13 8.6 -9 669.70 -55.9 -56.0 -56.1 64 -99 SPO 1997 04 10 22 22 13 8.5 -9 669.70 -55.9 -56.0 -56.1 64 -99 SPO 1997 04 10 22 23 15 8.9 -9 669.60 -56.0 -56.0 -56.1 65 -99 SPO 1997 04 10 22 24 16 9.0 -9 669.60 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 10 22 25 15 8.6 -9 669.60 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 10 22 26 15 8.6 -9 669.70 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 10 22 27 15 8.4 -9 669.70 -56.0 -56.0 -56.1 63 -99 SPO 1997 04 10 22 28 16 8.3 -9 669.70 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 10 22 29 16 8.2 -9 669.70 -56.0 -56.1 -56.1 64 -99 SPO 1997 04 10 22 30 16 8.5 -9 669.70 -56.0 -56.1 -56.1 65 -99 SPO 1997 04 10 22 31 16 8.2 -9 669.70 -56.0 -56.1 -56.1 65 -99 SPO 1997 04 10 22 32 17 8.2 -9 669.70 -56.0 -56.1 -56.1 64 -99 SPO 1997 04 10 22 33 16 8.3 -9 669.70 -56.1 -56.1 -56.1 65 -99 SPO 1997 04 10 22 34 15 8.6 -9 669.70 -56.1 -56.1 -56.1 64 -99 SPO 1997 04 10 22 35 12 9.0 -9 669.70 -56.1 -56.1 -56.1 64 -99 SPO 1997 04 10 22 36 12 8.8 -9 669.70 -56.0 -56.1 -56.1 64 -99 SPO 1997 04 10 22 37 12 8.8 -9 669.70 -56.0 -56.1 -56.1 64 -99 SPO 1997 04 10 22 38 12 8.6 -9 669.70 -56.0 -56.1 -56.2 63 -99 SPO 1997 04 10 22 39 13 8.2 -9 669.70 -56.0 -56.1 -56.2 63 -99 SPO 1997 04 10 22 40 14 8.4 -9 669.70 -56.1 -56.1 -56.2 64 -99 SPO 1997 04 10 22 41 15 8.4 -9 669.70 -56.1 -56.1 -56.2 64 -99 SPO 1997 04 10 22 42 13 8.2 -9 669.70 -56.1 -56.1 -56.2 64 -99 SPO 1997 04 10 22 43 13 8.5 -9 669.70 -56.1 -56.1 -56.2 64 -99 SPO 1997 04 10 22 44 14 8.3 -9 669.70 -56.1 -56.2 -56.2 64 -99 SPO 1997 04 10 22 45 14 8.4 -9 669.70 -56.1 -56.2 -56.2 64 -99 SPO 1997 04 10 22 46 14 8.2 -9 669.70 -56.1 -56.2 -56.2 63 -99 SPO 1997 04 10 22 47 13 8.1 -9 669.70 -56.1 -56.2 -56.3 63 -99 SPO 1997 04 10 22 48 14 8.2 -9 669.70 -56.1 -56.2 -56.2 63 -99 SPO 1997 04 10 22 49 15 8.1 -9 669.70 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 10 22 50 14 7.9 -9 669.70 -56.2 -56.3 -56.3 63 -99 SPO 1997 04 10 22 51 15 8.0 -9 669.70 -56.2 -56.3 -56.3 63 -99 SPO 1997 04 10 22 52 14 8.2 -9 669.70 -56.2 -56.3 -56.3 63 -99 SPO 1997 04 10 22 53 14 8.6 -9 669.70 -56.2 -56.3 -56.3 63 -99 SPO 1997 04 10 22 54 14 8.1 -9 669.70 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 10 22 55 13 8.5 -9 669.70 -56.2 -56.2 -56.3 64 -99 SPO 1997 04 10 22 56 13 8.7 -9 669.70 -56.2 -56.2 -56.3 64 -99 SPO 1997 04 10 22 57 11 8.6 -9 669.70 -56.2 -56.2 -56.3 64 -99 SPO 1997 04 10 22 58 12 9.3 -9 669.70 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 10 22 59 12 9.2 -9 669.70 -56.2 -56.2 -56.3 62 -99 SPO 1997 04 10 23 00 13 8.4 -9 669.60 -56.2 -56.3 -56.4 62 0 SPO 1997 04 10 23 01 13 8.4 -9 669.70 -56.2 -56.4 -56.4 61 -99 SPO 1997 04 10 23 02 13 8.2 -9 669.70 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 03 13 8.8 -9 669.60 -56.3 -56.4 -56.5 63 -99 SPO 1997 04 10 23 04 13 8.7 -9 669.60 -56.3 -56.4 -56.5 63 -99 SPO 1997 04 10 23 05 13 8.9 -9 669.60 -56.4 -56.4 -56.5 64 -99 SPO 1997 04 10 23 06 13 8.7 -9 669.60 -56.4 -56.4 -56.5 64 -99 SPO 1997 04 10 23 07 13 9.1 -9 669.60 -56.4 -56.4 -56.4 64 -99 SPO 1997 04 10 23 08 13 8.5 -9 669.60 -56.3 -56.4 -56.5 63 -99 SPO 1997 04 10 23 09 13 9.2 -9 669.60 -56.3 -56.4 -56.5 63 -99 SPO 1997 04 10 23 10 12 9.5 -9 669.60 -56.4 -56.3 -56.5 63 -99 SPO 1997 04 10 23 11 13 9.2 -9 669.60 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 12 13 9.8 -9 669.60 -56.4 -56.3 -56.5 63 -99 SPO 1997 04 10 23 13 13 9.4 -9 669.60 -56.4 -56.3 -56.5 63 -99 SPO 1997 04 10 23 14 14 9.7 -9 669.50 -56.4 -56.3 -56.5 63 -99 SPO 1997 04 10 23 15 13 9.6 -9 669.50 -56.4 -56.3 -56.5 62 -99 SPO 1997 04 10 23 16 12 9.7 -9 669.50 -56.4 -56.4 -56.5 62 -99 SPO 1997 04 10 23 17 12 9.6 -9 669.50 -56.4 -56.4 -56.5 62 -99 SPO 1997 04 10 23 18 11 10.2 -9 669.50 -56.4 -56.4 -56.4 62 -99 SPO 1997 04 10 23 19 11 9.6 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 20 11 10.2 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 21 11 10.0 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 22 11 9.7 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 23 12 9.9 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 24 13 9.4 -9 669.50 -56.4 -56.4 -56.5 63 -99 SPO 1997 04 10 23 25 13 9.1 -9 669.50 -56.4 -56.4 -56.5 64 -99 SPO 1997 04 10 23 26 13 9.2 -9 669.60 -56.4 -56.4 -56.5 64 -99 SPO 1997 04 10 23 27 13 9.4 -9 669.60 -56.4 -56.3 -56.5 64 -99 SPO 1997 04 10 23 28 12 9.6 -9 669.60 -56.4 -56.3 -56.5 64 -99 SPO 1997 04 10 23 29 12 9.7 -9 669.60 -56.4 -56.3 -56.4 64 -99 SPO 1997 04 10 23 30 11 9.9 -9 669.60 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 10 23 31 11 9.3 -9 669.50 -56.3 -56.3 -56.4 61 -99 SPO 1997 04 10 23 32 11 9.6 -9 669.50 -56.3 -56.3 -56.4 61 -99 SPO 1997 04 10 23 33 10 9.9 -9 669.60 -56.3 -56.4 -56.4 61 -99 SPO 1997 04 10 23 34 10 9.4 -9 669.60 -56.3 -56.4 -56.4 61 -99 SPO 1997 04 10 23 35 10 9.8 -9 669.60 -56.4 -56.4 -56.4 62 -99 SPO 1997 04 10 23 36 10 9.9 -9 669.60 -56.3 -56.4 -56.4 62 -99 SPO 1997 04 10 23 37 11 9.7 -9 669.60 -56.3 -56.4 -56.4 62 -99 SPO 1997 04 10 23 38 11 9.3 -9 669.60 -56.4 -56.4 -56.4 64 -99 SPO 1997 04 10 23 39 12 9.0 -9 669.60 -56.4 -56.4 -56.4 64 -99 SPO 1997 04 10 23 40 12 9.1 -9 669.60 -56.3 -56.4 -56.5 63 -99 SPO 1997 04 10 23 41 12 9.5 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 42 12 9.3 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 43 12 9.9 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 44 10 10.6 -9 669.60 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 10 23 45 10 10.0 -9 669.50 -56.3 -56.3 -56.3 63 -99 SPO 1997 04 10 23 46 10 10.1 -9 669.60 -56.2 -56.3 -56.4 61 -99 SPO 1997 04 10 23 47 12 9.6 -9 669.60 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 10 23 48 12 9.1 -9 669.60 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 10 23 49 12 8.9 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 50 14 9.7 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 51 14 10.0 -9 669.60 -56.4 -56.4 -56.4 63 -99 SPO 1997 04 10 23 52 12 9.7 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 53 13 9.7 -9 669.60 -56.3 -56.4 -56.4 63 -99 SPO 1997 04 10 23 54 12 9.1 -9 669.60 -56.3 -56.4 -56.4 62 -99 SPO 1997 04 10 23 55 13 9.7 -9 669.60 -56.4 -56.4 -56.4 63 -99 SPO 1997 04 10 23 56 14 10.1 -9 669.60 -56.3 -56.4 -56.4 61 -99 SPO 1997 04 10 23 57 14 9.8 -9 669.60 -56.2 -56.4 -56.3 61 -99 SPO 1997 04 10 23 58 14 9.3 -9 669.60 -56.2 -56.4 -56.4 -99 -99 SPO 1997 04 10 23 59 14 9.8 -9 669.60 -56.2 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 00 14 9.5 -9 669.60 -56.2 -56.3 -56.3 -99 0 SPO 1997 04 11 00 01 13 9.8 -9 669.60 -56.2 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 02 13 9.2 -9 669.60 -56.2 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 03 13 9.4 -9 669.60 -56.2 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 04 14 8.9 -9 669.70 -56.1 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 05 14 9.1 -9 669.60 -56.1 -56.3 -56.3 -99 -99 SPO 1997 04 11 00 06 14 9.3 -9 669.70 -56.2 -56.3 -56.2 -99 -99 SPO 1997 04 11 00 07 14 9.3 -9 669.70 -56.2 -56.3 -56.2 -99 -99 SPO 1997 04 11 00 08 14 9.1 -9 669.70 -56.1 -56.3 -56.2 -99 -99 SPO 1997 04 11 00 09 15 9.1 -9 669.70 -56.1 -56.3 -56.2 -99 -99 SPO 1997 04 11 00 10 15 9.4 -9 669.70 -56.1 -56.3 -56.1 -99 -99 SPO 1997 04 11 00 11 15 9.2 -9 669.70 -56.0 -56.3 -56.1 -99 -99 SPO 1997 04 11 00 12 14 9.3 -9 669.70 -56.0 -56.2 -56.1 -99 -99 SPO 1997 04 11 00 13 16 9.2 -9 669.70 -56.0 -56.2 -56.1 65 -99 SPO 1997 04 11 00 14 16 9.8 -9 669.70 -56.0 -56.2 -56.0 65 -99 SPO 1997 04 11 00 15 17 9.0 -9 669.80 -55.9 -56.2 -56.0 65 -99 SPO 1997 04 11 00 16 18 8.9 -9 669.70 -55.9 -56.1 -56.0 64 -99 SPO 1997 04 11 00 17 16 9.2 -9 669.70 -55.9 -56.1 -56.0 64 -99 SPO 1997 04 11 00 18 16 9.1 -9 669.70 -55.9 -56.1 -56.0 64 -99 SPO 1997 04 11 00 19 17 8.8 -9 669.80 -55.9 -56.1 -56.0 64 -99 SPO 1997 04 11 00 20 17 8.8 -9 669.70 -55.8 -56.1 -56.0 62 -99 SPO 1997 04 11 00 21 17 8.9 -9 669.80 -55.8 -56.1 -55.9 62 -99 SPO 1997 04 11 00 22 17 8.4 -9 669.80 -55.9 -56.1 -55.9 65 -99 SPO 1997 04 11 00 23 17 8.9 -9 669.70 -55.8 -56.1 -55.9 64 -99 SPO 1997 04 11 00 24 16 9.1 -9 669.70 -55.8 -56.1 -55.9 64 -99 SPO 1997 04 11 00 25 15 9.1 -9 669.80 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 00 26 15 9.8 -9 669.70 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 00 27 13 9.6 -9 669.70 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 00 28 13 9.5 -9 669.70 -55.8 -56.0 -55.8 65 -99 SPO 1997 04 11 00 29 11 9.4 -9 669.70 -55.8 -56.0 -55.8 65 -99 SPO 1997 04 11 00 30 13 9.3 -9 669.70 -55.8 -56.0 -55.8 65 -99 SPO 1997 04 11 00 31 11 8.7 -9 669.70 -55.7 -56.0 -55.8 64 -99 SPO 1997 04 11 00 32 11 9.6 -9 669.70 -55.6 -56.0 -55.8 63 -99 SPO 1997 04 11 00 33 11 9.0 -9 669.70 -55.6 -55.9 -55.8 64 -99 SPO 1997 04 11 00 34 11 9.4 -9 669.70 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 35 10 10.3 -9 669.70 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 36 11 8.9 -9 669.60 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 37 9 9.8 -9 669.60 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 38 10 9.2 -9 669.60 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 00 39 9 9.6 -9 669.60 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 00 40 9 9.7 -9 669.60 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 00 41 7 10.3 -9 669.60 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 42 8 10.3 -9 669.60 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 43 9 9.6 -9 669.60 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 44 10 10.0 -9 669.50 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 45 8 10.1 -9 669.50 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 46 8 9.8 -9 669.50 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 47 8 10.0 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 48 9 10.2 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 00 49 8 10.4 -9 669.40 -55.5 -55.8 -55.7 65 -99 SPO 1997 04 11 00 50 8 9.9 -9 669.40 -55.5 -55.7 -55.7 64 -99 SPO 1997 04 11 00 51 7 10.3 -9 669.40 -55.6 -55.7 -55.7 64 -99 SPO 1997 04 11 00 52 8 10.3 -9 669.40 -55.6 -55.7 -55.7 64 -99 SPO 1997 04 11 00 53 7 10.4 -9 669.40 -55.5 -55.8 -55.7 63 -99 SPO 1997 04 11 00 54 7 10.4 -9 669.40 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 55 7 10.3 -9 669.40 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 00 56 6 10.3 -9 669.40 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 00 57 7 11.0 -9 669.40 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 00 58 6 11.1 -9 669.40 -55.7 -55.9 -55.8 67 -99 SPO 1997 04 11 00 59 6 11.2 -9 669.30 -55.7 -55.9 -55.8 67 -99 SPO 1997 04 11 01 00 5 10.8 -9 669.30 -55.7 -55.9 -55.8 67 0 SPO 1997 04 11 01 01 5 10.9 -9 669.30 -55.7 -55.9 -55.9 66 -99 SPO 1997 04 11 01 02 6 10.5 -9 669.30 -55.8 -55.9 -55.9 67 -99 SPO 1997 04 11 01 03 6 10.6 -9 669.30 -55.8 -56.0 -56.0 66 -99 SPO 1997 04 11 01 04 5 10.7 -9 669.30 -55.7 -56.0 -56.0 65 -99 SPO 1997 04 11 01 05 5 10.7 -9 669.30 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 11 01 06 5 10.5 -9 669.30 -55.8 -55.9 -56.0 65 -99 SPO 1997 04 11 01 07 5 10.1 -9 669.30 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 11 01 08 4 10.6 -9 669.30 -55.9 -56.0 -56.0 65 -99 SPO 1997 04 11 01 09 4 11.1 -9 669.30 -55.9 -56.0 -56.0 65 -99 SPO 1997 04 11 01 10 4 10.9 -9 669.30 -55.9 -56.0 -56.0 65 -99 SPO 1997 04 11 01 11 4 10.4 -9 669.30 -55.9 -56.0 -56.0 65 -99 SPO 1997 04 11 01 12 4 10.7 -9 669.30 -55.9 -56.1 -56.1 65 -99 SPO 1997 04 11 01 13 4 10.7 -9 669.30 -56.0 -56.1 -56.1 65 -99 SPO 1997 04 11 01 14 4 10.5 -9 669.30 -56.0 -56.1 -56.1 65 -99 SPO 1997 04 11 01 15 4 10.5 -9 669.30 -56.0 -56.1 -56.2 65 -99 SPO 1997 04 11 01 16 5 10.9 -9 669.30 -56.0 -56.1 -56.2 65 -99 SPO 1997 04 11 01 17 5 10.1 -9 669.30 -56.1 -56.1 -56.2 65 -99 SPO 1997 04 11 01 18 5 10.7 -9 669.30 -56.1 -56.1 -56.2 65 -99 SPO 1997 04 11 01 19 5 10.3 -9 669.30 -56.0 -56.2 -56.2 65 -99 SPO 1997 04 11 01 20 5 10.8 -9 669.30 -56.0 -56.1 -56.2 65 -99 SPO 1997 04 11 01 21 5 10.4 -9 669.30 -56.1 -56.1 -56.2 65 -99 SPO 1997 04 11 01 22 5 10.6 -9 669.30 -56.1 -56.1 -56.2 65 -99 SPO 1997 04 11 01 23 5 10.9 -9 669.30 -56.1 -56.1 -56.2 64 -99 SPO 1997 04 11 01 24 5 10.9 -9 669.30 -56.1 -56.1 -56.3 64 -99 SPO 1997 04 11 01 25 5 10.7 -9 669.30 -56.1 -56.1 -56.3 64 -99 SPO 1997 04 11 01 26 5 10.4 -9 669.20 -56.1 -56.2 -56.3 63 -99 SPO 1997 04 11 01 27 5 10.7 -9 669.20 -56.2 -56.2 -56.3 64 -99 SPO 1997 04 11 01 28 5 10.7 -9 669.20 -56.2 -56.3 -56.3 64 -99 SPO 1997 04 11 01 29 4 10.9 -9 669.30 -56.2 -56.3 -56.3 64 -99 SPO 1997 04 11 01 30 5 10.5 -9 669.30 -56.2 -56.3 -56.4 65 -99 SPO 1997 04 11 01 31 6 10.8 -9 669.30 -56.2 -56.3 -56.4 65 -99 SPO 1997 04 11 01 32 6 10.3 -9 669.30 -56.2 -56.3 -56.4 65 -99 SPO 1997 04 11 01 33 7 10.5 -9 669.30 -56.3 -56.3 -56.4 66 -99 SPO 1997 04 11 01 34 7 10.2 -9 669.30 -56.2 -56.4 -56.4 65 -99 SPO 1997 04 11 01 35 7 10.5 -9 669.40 -56.2 -56.4 -56.4 64 -99 SPO 1997 04 11 01 36 7 10.2 -9 669.40 -56.3 -56.3 -56.4 65 -99 SPO 1997 04 11 01 37 8 10.2 -9 669.40 -56.3 -56.3 -56.4 64 -99 SPO 1997 04 11 01 38 8 10.3 -9 669.40 -56.3 -56.3 -56.4 64 -99 SPO 1997 04 11 01 39 8 9.9 -9 669.40 -56.3 -56.3 -56.4 64 -99 SPO 1997 04 11 01 40 8 10.5 -9 669.40 -56.3 -56.3 -56.4 64 -99 SPO 1997 04 11 01 41 6 10.4 -9 669.40 -56.3 -56.3 -56.4 64 -99 SPO 1997 04 11 01 42 6 9.9 -9 669.40 -56.3 -56.4 -56.4 64 -99 SPO 1997 04 11 01 43 7 10.5 -9 669.40 -56.3 -56.4 -56.4 65 -99 SPO 1997 04 11 01 44 8 10.2 -9 669.40 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 11 01 45 7 10.3 -9 669.40 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 11 01 46 7 10.6 -9 669.40 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 11 01 47 7 10.6 -9 669.40 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 11 01 48 7 10.3 -9 669.40 -56.3 -56.4 -56.3 66 -99 SPO 1997 04 11 01 49 8 10.0 -9 669.40 -56.3 -56.4 -56.3 65 -99 SPO 1997 04 11 01 50 7 10.1 -9 669.40 -56.2 -56.3 -56.3 64 -99 SPO 1997 04 11 01 51 8 9.9 -9 669.40 -56.1 -56.4 -56.3 64 -99 SPO 1997 04 11 01 52 8 10.3 -9 669.50 -56.2 -56.3 -56.3 65 -99 SPO 1997 04 11 01 53 8 10.1 -9 669.50 -56.2 -56.3 -56.3 66 -99 SPO 1997 04 11 01 54 8 9.9 -9 669.50 -56.2 -56.3 -56.3 66 -99 SPO 1997 04 11 01 55 8 9.8 -9 669.50 -56.2 -56.3 -56.3 66 -99 SPO 1997 04 11 01 56 8 9.6 -9 669.50 -56.2 -56.3 -56.3 66 -99 SPO 1997 04 11 01 57 7 9.9 -9 669.50 -56.2 -56.3 -56.3 65 -99 SPO 1997 04 11 01 58 8 9.3 -9 669.60 -56.2 -56.3 -56.3 65 -99 SPO 1997 04 11 01 59 9 9.4 -9 669.60 -56.2 -56.4 -56.3 65 -99 SPO 1997 04 11 02 00 7 9.4 -9 669.50 -56.2 -56.4 -56.3 65 0 SPO 1997 04 11 02 01 7 9.5 -9 669.60 -56.2 -56.4 -56.3 65 -99 SPO 1997 04 11 02 02 8 9.7 -9 669.60 -56.2 -56.4 -56.3 65 -99 SPO 1997 04 11 02 03 8 9.6 -9 669.60 -56.2 -56.4 -56.3 65 -99 SPO 1997 04 11 02 04 9 9.3 -9 669.60 -56.2 -56.4 -56.3 66 -99 SPO 1997 04 11 02 05 9 9.9 -9 669.50 -56.2 -56.4 -56.3 66 -99 SPO 1997 04 11 02 06 9 9.7 -9 669.60 -56.2 -56.3 -56.3 66 -99 SPO 1997 04 11 02 07 9 9.7 -9 669.60 -56.1 -56.3 -56.3 65 -99 SPO 1997 04 11 02 08 8 9.3 -9 669.60 -56.1 -56.3 -56.3 64 -99 SPO 1997 04 11 02 09 9 9.4 -9 669.60 -56.1 -56.3 -56.3 64 -99 SPO 1997 04 11 02 10 8 9.1 -9 669.60 -56.1 -56.3 -56.3 64 -99 SPO 1997 04 11 02 11 9 9.5 -9 669.60 -56.1 -56.3 -56.3 64 -99 SPO 1997 04 11 02 12 8 9.4 -9 669.60 -56.1 -56.3 -56.3 64 -99 SPO 1997 04 11 02 13 9 9.2 -9 669.60 -56.1 -56.2 -56.3 64 -99 SPO 1997 04 11 02 14 9 10.0 -9 669.60 -56.1 -56.2 -56.2 64 -99 SPO 1997 04 11 02 15 9 9.9 -9 669.60 -56.1 -56.3 -56.2 64 -99 SPO 1997 04 11 02 16 9 10.2 -9 669.60 -56.1 -56.3 -56.2 65 -99 SPO 1997 04 11 02 17 7 10.2 -9 669.60 -56.1 -56.3 -56.2 65 -99 SPO 1997 04 11 02 18 8 9.8 -9 669.60 -56.1 -56.3 -56.2 66 -99 SPO 1997 04 11 02 19 8 9.6 -9 669.60 -56.1 -56.3 -56.2 65 -99 SPO 1997 04 11 02 20 8 10.2 -9 669.60 -56.1 -56.2 -56.1 64 -99 SPO 1997 04 11 02 21 8 9.4 -9 669.60 -56.1 -56.2 -56.1 64 -99 SPO 1997 04 11 02 22 8 9.7 -9 669.60 -56.1 -56.2 -56.1 64 -99 SPO 1997 04 11 02 23 8 10.1 -9 669.60 -56.0 -56.2 -56.1 64 -99 SPO 1997 04 11 02 24 9 9.6 -9 669.60 -55.9 -56.2 -56.1 63 -99 SPO 1997 04 11 02 25 9 9.6 -9 669.60 -55.9 -56.2 -56.1 64 -99 SPO 1997 04 11 02 26 9 9.4 -9 669.60 -55.9 -56.1 -56.1 65 -99 SPO 1997 04 11 02 27 9 9.9 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 28 9 9.6 -9 669.60 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 29 9 9.9 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 30 10 9.5 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 31 10 9.5 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 32 12 9.9 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 33 12 9.7 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 34 12 9.6 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 35 12 9.4 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 36 13 9.1 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 37 13 9.7 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 38 13 9.2 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 39 14 8.9 -9 669.70 -55.9 -56.1 -56.0 65 -99 SPO 1997 04 11 02 40 14 9.4 -9 669.70 -55.8 -56.1 -56.0 65 -99 SPO 1997 04 11 02 41 16 8.9 -9 669.70 -55.8 -56.1 -56.0 65 -99 SPO 1997 04 11 02 42 15 9.6 -9 669.70 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 11 02 43 14 9.6 -9 669.70 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 11 02 44 14 9.7 -9 669.60 -55.8 -56.0 -56.0 64 -99 SPO 1997 04 11 02 45 13 9.4 -9 669.70 -55.8 -56.0 -55.9 64 -99 SPO 1997 04 11 02 46 13 8.8 -9 669.70 -55.8 -56.0 -55.9 63 -99 SPO 1997 04 11 02 47 14 8.7 -9 669.60 -55.8 -56.0 -55.9 64 -99 SPO 1997 04 11 02 48 14 9.3 -9 669.60 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 02 49 14 9.8 -9 669.60 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 02 50 15 9.7 -9 669.60 -55.8 -56.0 -55.9 65 -99 SPO 1997 04 11 02 51 15 9.4 -9 669.60 -55.8 -56.1 -55.9 65 -99 SPO 1997 04 11 02 52 15 9.0 -9 669.60 -55.8 -56.0 -55.9 65 -99 SPO 1997 04 11 02 53 14 9.0 -9 669.60 -55.8 -56.0 -55.9 65 -99 SPO 1997 04 11 02 54 15 9.8 -9 669.60 -55.8 -56.0 -55.8 65 -99 SPO 1997 04 11 02 55 15 9.2 -9 669.60 -55.8 -56.0 -55.8 65 -99 SPO 1997 04 11 02 56 16 9.3 -9 669.60 -55.8 -56.0 -55.8 64 -99 SPO 1997 04 11 02 57 17 8.9 -9 669.60 -55.7 -56.0 -55.8 63 -99 SPO 1997 04 11 02 58 17 9.1 -9 669.60 -55.6 -55.9 -55.8 62 -99 SPO 1997 04 11 02 59 18 9.2 -9 669.60 -55.7 -55.9 -55.8 64 -99 SPO 1997 04 11 03 00 19 9.2 -9 669.70 -55.7 -55.9 -55.8 65 0 SPO 1997 04 11 03 01 19 9.7 -9 669.70 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 11 03 02 19 9.2 -9 669.70 -55.6 -55.8 -55.8 65 -99 SPO 1997 04 11 03 03 19 9.2 -9 669.70 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 04 20 8.8 -9 669.70 -55.7 -55.9 -55.7 65 -99 SPO 1997 04 11 03 05 20 9.1 -9 669.70 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 03 06 20 8.4 -9 669.70 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 03 07 22 9.0 -9 669.70 -55.6 -56.0 -55.8 64 -99 SPO 1997 04 11 03 08 22 9.0 -9 669.60 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 11 03 09 22 8.7 -9 669.70 -55.7 -55.9 -55.8 64 -99 SPO 1997 04 11 03 10 23 9.1 -9 669.60 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 11 03 11 21 9.3 -9 669.60 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 11 03 12 21 9.3 -9 669.60 -55.7 -55.9 -55.8 65 -99 SPO 1997 04 11 03 13 22 9.1 -9 669.60 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 03 14 22 8.9 -9 669.60 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 15 22 9.2 -9 669.60 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 16 23 8.5 -9 669.60 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 17 23 8.8 -9 669.60 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 03 18 23 8.8 -9 669.60 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 03 19 22 8.6 -9 669.60 -55.6 -55.9 -55.7 64 -99 SPO 1997 04 11 03 20 22 8.9 -9 669.60 -55.6 -55.9 -55.7 64 -99 SPO 1997 04 11 03 21 22 8.7 -9 669.60 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 22 21 9.3 -9 669.50 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 23 22 9.5 -9 669.50 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 24 21 8.9 -9 669.50 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 25 20 9.1 -9 669.50 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 26 20 9.0 -9 669.50 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 27 19 9.9 -9 669.50 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 28 20 9.8 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 29 17 10.3 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 30 18 10.0 -9 669.40 -55.5 -55.8 -55.7 63 -99 SPO 1997 04 11 03 31 19 9.2 -9 669.40 -55.5 -55.8 -55.7 63 -99 SPO 1997 04 11 03 32 18 9.7 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 33 19 9.5 -9 669.40 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 11 03 34 19 9.6 -9 669.40 -55.5 -55.8 -55.7 65 -99 SPO 1997 04 11 03 35 18 9.4 -9 669.40 -55.5 -55.8 -55.7 65 -99 SPO 1997 04 11 03 36 18 9.4 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 37 18 9.8 -9 669.40 -55.6 -55.9 -55.7 65 -99 SPO 1997 04 11 03 38 16 10.2 -9 669.40 -55.5 -55.9 -55.7 65 -99 SPO 1997 04 11 03 39 17 10.0 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 40 15 9.9 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 41 15 10.2 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 42 15 10.4 -9 669.40 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 03 43 14 10.5 -9 669.40 -55.6 -55.8 -55.7 64 -99 SPO 1997 04 11 03 44 15 10.6 -9 669.40 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 45 14 10.5 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 46 14 10.1 -9 669.40 -55.5 -55.8 -55.7 64 -99 SPO 1997 04 11 03 47 14 10.3 -9 669.30 -55.5 -55.8 -55.7 65 -99 SPO 1997 04 11 03 48 14 11.0 -9 669.30 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 11 03 49 14 9.8 -9 669.30 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 11 03 50 14 10.6 -9 669.30 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 11 03 51 13 10.7 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 52 13 10.6 -9 669.20 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 53 12 10.9 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 54 12 10.0 -9 669.30 -55.6 -55.9 -55.8 65 -99 SPO 1997 04 11 03 55 13 10.4 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 56 13 10.1 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 57 14 10.7 -9 669.30 -55.6 -55.8 -55.8 65 -99 SPO 1997 04 11 03 58 13 10.8 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 03 59 14 10.5 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 04 00 15 9.8 -9 669.30 -55.6 -55.8 -55.7 65 0 SPO 1997 04 11 04 01 15 10.0 -9 669.30 -55.6 -55.8 -55.7 65 -99 SPO 1997 04 11 04 02 15 10.1 -9 669.30 -55.5 -55.8 -55.7 64 -99 SPO 1997 04 11 04 03 16 10.1 -9 669.30 -55.5 -55.8 -55.6 64 -99 SPO 1997 04 11 04 04 16 10.0 -9 669.30 -55.5 -55.7 -55.6 64 -99 SPO 1997 04 11 04 05 17 10.1 -9 669.30 -55.5 -55.7 -55.6 64 -99 SPO 1997 04 11 04 06 17 9.8 -9 669.30 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 11 04 07 16 9.8 -9 669.40 -55.4 -55.7 -55.6 64 -99 SPO 1997 04 11 04 08 15 10.5 -9 669.40 -55.4 -55.7 -55.6 65 -99 SPO 1997 04 11 04 09 14 9.7 -9 669.40 -55.4 -55.7 -55.5 65 -99 SPO 1997 04 11 04 10 14 9.1 -9 669.40 -55.4 -55.7 -55.5 65 -99 SPO 1997 04 11 04 11 15 10.1 -9 669.40 -55.4 -55.7 -55.5 65 -99 SPO 1997 04 11 04 12 16 9.4 -9 669.40 -55.4 -55.7 -55.5 65 -99 SPO 1997 04 11 04 13 15 9.3 -9 669.40 -55.4 -55.7 -55.4 65 -99 SPO 1997 04 11 04 14 16 9.1 -9 669.40 -55.3 -55.6 -55.4 64 -99 SPO 1997 04 11 04 15 17 9.6 -9 669.40 -55.3 -55.6 -55.4 64 -99 SPO 1997 04 11 04 16 16 9.9 -9 669.40 -55.3 -55.6 -55.4 64 -99 SPO 1997 04 11 04 17 18 10.0 -9 669.30 -55.3 -55.6 -55.4 65 -99 SPO 1997 04 11 04 18 18 10.2 -9 669.30 -55.3 -55.5 -55.3 65 -99 SPO 1997 04 11 04 19 16 9.7 -9 669.30 -55.2 -55.5 -55.3 66 -99 SPO 1997 04 11 04 20 16 10.1 -9 669.30 -55.2 -55.5 -55.2 66 -99 SPO 1997 04 11 04 21 17 10.1 -9 669.30 -55.1 -55.4 -55.2 66 -99 SPO 1997 04 11 04 22 15 10.3 -9 669.30 -55.1 -55.4 -55.2 66 -99 SPO 1997 04 11 04 23 17 9.5 -9 669.30 -55.1 -55.4 -55.2 66 -99 SPO 1997 04 11 04 24 17 9.4 -9 669.30 -55.1 -55.4 -55.1 66 -99 SPO 1997 04 11 04 25 18 9.7 -9 669.30 -55.1 -55.4 -55.1 66 -99 SPO 1997 04 11 04 26 17 10.2 -9 669.40 -55.0 -55.4 -55.1 66 -99 SPO 1997 04 11 04 27 16 9.8 -9 669.40 -55.0 -55.4 -55.1 66 -99 SPO 1997 04 11 04 28 17 9.5 -9 669.40 -55.0 -55.4 -55.1 66 -99 SPO 1997 04 11 04 29 17 9.5 -9 669.40 -55.0 -55.3 -55.1 66 -99 SPO 1997 04 11 04 30 17 10.1 -9 669.40 -55.0 -55.3 -55.1 66 -99 SPO 1997 04 11 04 31 15 10.0 -9 669.40 -54.9 -55.3 -55.1 66 -99 SPO 1997 04 11 04 32 16 9.6 -9 669.40 -54.9 -55.3 -55.0 66 -99 SPO 1997 04 11 04 33 15 9.9 -9 669.40 -54.9 -55.2 -55.0 66 -99 SPO 1997 04 11 04 34 15 9.2 -9 669.40 -54.9 -55.2 -55.0 66 -99 SPO 1997 04 11 04 35 16 9.9 -9 669.30 -54.8 -55.2 -55.0 66 -99 SPO 1997 04 11 04 36 15 9.6 -9 669.30 -54.8 -55.2 -54.9 65 -99 SPO 1997 04 11 04 37 15 9.6 -9 669.30 -54.8 -55.1 -54.9 65 -99 SPO 1997 04 11 04 38 15 9.0 -9 669.30 -54.8 -55.1 -54.9 65 -99 SPO 1997 04 11 04 39 14 10.0 -9 669.30 -54.8 -55.1 -54.9 64 -99 SPO 1997 04 11 04 40 14 10.6 -9 669.30 -54.7 -55.1 -54.9 63 -99 SPO 1997 04 11 04 41 14 9.7 -9 669.30 -54.7 -55.1 -54.8 65 -99 SPO 1997 04 11 04 42 13 9.2 -9 669.30 -54.7 -55.1 -54.8 65 -99 SPO 1997 04 11 04 43 11 10.3 -9 669.30 -54.7 -55.0 -54.7 66 -99 SPO 1997 04 11 04 44 12 10.3 -9 669.20 -54.6 -55.0 -54.7 65 -99 SPO 1997 04 11 04 45 12 10.4 -9 669.20 -54.6 -55.0 -54.8 65 -99 SPO 1997 04 11 04 46 12 10.2 -9 669.20 -54.6 -55.0 -54.8 65 -99 SPO 1997 04 11 04 47 11 11.0 -9 669.20 -54.6 -54.9 -54.7 65 -99 SPO 1997 04 11 04 48 12 11.5 -9 669.20 -54.6 -54.9 -54.7 65 -99 SPO 1997 04 11 04 49 10 11.0 -9 669.20 -54.6 -54.9 -54.7 65 -99 SPO 1997 04 11 04 50 10 10.3 -9 669.20 -54.6 -54.9 -54.7 66 -99 SPO 1997 04 11 04 51 9 11.5 -9 669.20 -54.6 -54.9 -54.7 66 -99 SPO 1997 04 11 04 52 10 10.5 -9 669.20 -54.6 -54.9 -54.7 67 -99 SPO 1997 04 11 04 53 11 10.7 -9 669.20 -54.6 -54.8 -54.6 67 -99 SPO 1997 04 11 04 54 10 10.5 -9 669.20 -54.5 -54.8 -54.6 66 -99 SPO 1997 04 11 04 55 11 10.7 -9 669.20 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 11 04 56 10 10.5 -9 669.20 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 11 04 57 11 10.2 -9 669.20 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 11 04 58 11 10.6 -9 669.20 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 11 04 59 11 10.8 -9 669.20 -54.5 -54.8 -54.6 66 -99 SPO 1997 04 11 05 00 11 10.6 -9 669.20 -54.5 -54.8 -54.6 66 0 SPO 1997 04 11 05 01 12 10.5 -9 669.20 -54.5 -54.8 -54.6 66 -99 SPO 1997 04 11 05 02 12 9.9 -9 669.20 -54.4 -54.8 -54.5 67 -99 SPO 1997 04 11 05 03 12 10.9 -9 669.30 -54.4 -54.8 -54.5 67 -99 SPO 1997 04 11 05 04 12 10.3 -9 669.20 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 11 05 05 12 10.4 -9 669.20 -54.4 -54.8 -54.5 67 -99 SPO 1997 04 11 05 06 13 10.0 -9 669.30 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 11 05 07 13 9.2 -9 669.30 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 11 05 08 14 9.4 -9 669.30 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 11 05 09 14 10.7 -9 669.30 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 11 05 10 15 9.9 -9 669.30 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 11 05 11 16 9.7 -9 669.30 -54.4 -54.7 -54.5 66 -99 SPO 1997 04 11 05 12 17 9.9 -9 669.30 -54.4 -54.7 -54.5 64 -99 SPO 1997 04 11 05 13 16 9.6 -9 669.30 -54.3 -54.7 -54.5 63 -99 SPO 1997 04 11 05 14 16 9.7 -9 669.30 -54.3 -54.7 -54.5 65 -99 SPO 1997 04 11 05 15 17 9.6 -9 669.30 -54.3 -54.7 -54.5 66 -99 SPO 1997 04 11 05 16 17 9.7 -9 669.30 -54.3 -54.7 -54.4 66 -99 SPO 1997 04 11 05 17 18 10.0 -9 669.30 -54.3 -54.7 -54.4 67 -99 SPO 1997 04 11 05 18 18 9.0 -9 669.30 -54.3 -54.7 -54.4 67 -99 SPO 1997 04 11 05 19 19 8.4 -9 669.30 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 11 05 20 20 9.9 -9 669.30 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 11 05 21 16 9.5 -9 669.30 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 11 05 22 18 8.7 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 23 20 8.8 -9 669.30 -54.2 -54.6 -54.3 66 -99 SPO 1997 04 11 05 24 20 9.7 -9 669.30 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 05 25 20 8.9 -9 669.30 -54.2 -54.5 -54.4 66 -99 SPO 1997 04 11 05 26 18 9.1 -9 669.30 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 05 27 20 9.2 -9 669.30 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 05 28 21 9.6 -9 669.30 -54.2 -54.5 -54.4 67 -99 SPO 1997 04 11 05 29 18 9.6 -9 669.30 -54.2 -54.5 -54.4 67 -99 SPO 1997 04 11 05 30 19 8.9 -9 669.30 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 05 31 19 8.4 -9 669.30 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 05 32 20 9.5 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 33 19 9.6 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 34 21 9.1 -9 669.30 -54.2 -54.6 -54.3 65 -99 SPO 1997 04 11 05 35 20 8.0 -9 669.30 -54.2 -54.6 -54.4 65 -99 SPO 1997 04 11 05 36 22 8.7 -9 669.30 -54.2 -54.6 -54.4 65 -99 SPO 1997 04 11 05 37 20 9.4 -9 669.30 -54.2 -54.6 -54.4 65 -99 SPO 1997 04 11 05 38 20 9.4 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 39 19 9.0 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 40 19 8.7 -9 669.30 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 05 41 20 9.6 -9 669.30 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 05 42 19 9.5 -9 669.30 -54.2 -54.5 -54.4 67 -99 SPO 1997 04 11 05 43 20 9.3 -9 669.30 -54.3 -54.5 -54.4 67 -99 SPO 1997 04 11 05 44 20 8.8 -9 669.30 -54.2 -54.5 -54.4 66 -99 SPO 1997 04 11 05 45 18 9.7 -9 669.30 -54.2 -54.5 -54.4 65 -99 SPO 1997 04 11 05 46 18 9.6 -9 669.30 -54.2 -54.5 -54.4 65 -99 SPO 1997 04 11 05 47 17 9.6 -9 669.30 -54.2 -54.6 -54.3 66 -99 SPO 1997 04 11 05 48 18 10.1 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 49 18 9.3 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 50 21 9.0 -9 669.30 -54.2 -54.6 -54.3 66 -99 SPO 1997 04 11 05 51 19 9.6 -9 669.30 -54.2 -54.6 -54.3 66 -99 SPO 1997 04 11 05 52 22 9.6 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 53 21 9.7 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 54 19 9.8 -9 669.30 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 05 55 20 9.4 -9 669.30 -54.2 -54.6 -54.4 65 -99 SPO 1997 04 11 05 56 22 9.0 -9 669.40 -54.2 -54.5 -54.3 65 -99 SPO 1997 04 11 05 57 20 9.5 -9 669.40 -54.2 -54.5 -54.3 65 -99 SPO 1997 04 11 05 58 21 8.3 -9 669.40 -54.2 -54.5 -54.3 65 -99 SPO 1997 04 11 05 59 24 8.9 -9 669.40 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 06 00 21 9.2 -9 669.40 -54.2 -54.5 -54.3 66 0 SPO 1997 04 11 06 01 22 8.9 -9 669.50 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 06 02 22 8.3 -9 669.40 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 06 03 23 8.2 -9 669.50 -54.2 -54.6 -54.3 67 -99 SPO 1997 04 11 06 04 24 8.1 -9 669.40 -54.2 -54.6 -54.3 67 -99 SPO 1997 04 11 06 05 23 8.7 -9 669.40 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 06 06 23 8.7 -9 669.40 -54.2 -54.6 -54.4 67 -99 SPO 1997 04 11 06 07 23 8.6 -9 669.50 -54.2 -54.6 -54.3 67 -99 SPO 1997 04 11 06 08 22 8.6 -9 669.50 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 06 09 25 8.6 -9 669.50 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 06 10 25 8.0 -9 669.50 -54.2 -54.6 -54.4 66 -99 SPO 1997 04 11 06 11 25 8.0 -9 669.50 -54.2 -54.6 -54.3 67 -99 SPO 1997 04 11 06 12 24 8.8 -9 669.50 -54.2 -54.5 -54.3 66 -99 SPO 1997 04 11 06 13 25 8.7 -9 669.50 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 14 24 8.4 -9 669.50 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 15 24 8.7 -9 669.50 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 16 26 8.1 -9 669.40 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 17 25 8.7 -9 669.40 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 18 25 8.4 -9 669.50 -54.2 -54.4 -54.3 67 -99 SPO 1997 04 11 06 19 25 8.0 -9 669.50 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 11 06 20 25 8.5 -9 669.50 -54.1 -54.5 -54.3 65 -99 SPO 1997 04 11 06 21 24 9.4 -9 669.50 -54.2 -54.5 -54.2 66 -99 SPO 1997 04 11 06 22 25 8.6 -9 669.40 -54.1 -54.5 -54.2 66 -99 SPO 1997 04 11 06 23 25 9.0 -9 669.50 -54.1 -54.5 -54.3 66 -99 SPO 1997 04 11 06 24 27 8.7 -9 669.50 -54.1 -54.5 -54.2 66 -99 SPO 1997 04 11 06 25 25 8.4 -9 669.50 -54.1 -54.5 -54.2 67 -99 SPO 1997 04 11 06 26 27 8.5 -9 669.50 -54.1 -54.4 -54.2 67 -99 SPO 1997 04 11 06 27 28 8.1 -9 669.50 -54.1 -54.4 -54.2 67 -99 SPO 1997 04 11 06 28 29 8.2 -9 669.50 -54.0 -54.4 -54.2 67 -99 SPO 1997 04 11 06 29 27 9.2 -9 669.40 -54.0 -54.4 -54.2 66 -99 SPO 1997 04 11 06 30 28 9.8 -9 669.40 -54.0 -54.4 -54.2 66 -99 SPO 1997 04 11 06 31 28 9.4 -9 669.40 -54.0 -54.4 -54.2 66 -99 SPO 1997 04 11 06 32 28 9.1 -9 669.40 -54.0 -54.3 -54.1 65 -99 SPO 1997 04 11 06 33 28 8.9 -9 669.40 -54.0 -54.3 -54.1 66 -99 SPO 1997 04 11 06 34 27 8.8 -9 669.50 -54.0 -54.3 -54.1 66 -99 SPO 1997 04 11 06 35 29 8.4 -9 669.50 -54.0 -54.3 -54.1 66 -99 SPO 1997 04 11 06 36 29 8.6 -9 669.40 -53.9 -54.3 -54.1 65 -99 SPO 1997 04 11 06 37 28 9.1 -9 669.50 -54.0 -54.3 -54.0 67 -99 SPO 1997 04 11 06 38 30 8.7 -9 669.50 -54.0 -54.3 -54.1 67 -99 SPO 1997 04 11 06 39 29 8.4 -9 669.50 -53.9 -54.3 -54.1 66 -99 SPO 1997 04 11 06 40 27 9.7 -9 669.50 -53.9 -54.3 -54.0 66 -99 SPO 1997 04 11 06 41 28 9.3 -9 669.40 -54.0 -54.3 -54.0 67 -99 SPO 1997 04 11 06 42 29 8.3 -9 669.50 -53.9 -54.3 -54.0 65 -99 SPO 1997 04 11 06 43 30 7.8 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 06 44 30 8.6 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 06 45 30 9.1 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 06 46 29 9.8 -9 669.50 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 47 29 8.4 -9 669.50 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 48 30 8.8 -9 669.50 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 49 28 8.9 -9 669.50 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 50 28 9.2 -9 669.60 -53.8 -54.2 -54.0 67 -99 SPO 1997 04 11 06 51 30 9.4 -9 669.60 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 52 30 9.4 -9 669.60 -53.8 -54.2 -54.0 66 -99 SPO 1997 04 11 06 53 27 8.2 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 06 54 29 8.5 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 06 55 27 8.4 -9 669.60 -53.8 -54.2 -54.0 65 -99 SPO 1997 04 11 06 56 26 9.0 -9 669.60 -53.8 -54.2 -54.0 65 -99 SPO 1997 04 11 06 57 28 8.8 -9 669.60 -53.8 -54.2 -54.0 66 -99 SPO 1997 04 11 06 58 29 9.5 -9 669.60 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 06 59 28 9.3 -9 669.60 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 07 00 28 9.1 -9 669.70 -53.9 -54.2 -54.0 67 0 SPO 1997 04 11 07 01 27 9.1 -9 669.60 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 07 02 26 8.2 -9 669.70 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 07 03 26 8.2 -9 669.70 -53.9 -54.2 -54.0 67 -99 SPO 1997 04 11 07 04 26 8.6 -9 669.70 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 05 27 8.6 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 06 28 9.2 -9 669.70 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 07 28 8.7 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 08 27 8.5 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 09 27 8.2 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 10 27 8.7 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 11 26 8.0 -9 669.60 -53.9 -54.3 -54.0 66 -99 SPO 1997 04 11 07 12 26 8.6 -9 669.70 -53.9 -54.3 -54.0 66 -99 SPO 1997 04 11 07 13 27 8.0 -9 669.60 -53.9 -54.3 -54.0 66 -99 SPO 1997 04 11 07 14 27 7.7 -9 669.60 -53.9 -54.3 -54.0 65 -99 SPO 1997 04 11 07 15 26 8.4 -9 669.60 -53.9 -54.3 -54.0 65 -99 SPO 1997 04 11 07 16 27 8.2 -9 669.60 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 17 27 9.4 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 18 28 9.1 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 19 27 8.8 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 20 26 9.2 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 21 27 8.6 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 22 28 7.9 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 23 25 9.1 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 24 28 7.6 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 25 27 8.0 -9 669.50 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 26 26 8.9 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 27 25 8.6 -9 669.50 -53.9 -54.2 -54.0 64 -99 SPO 1997 04 11 07 28 25 8.1 -9 669.50 -53.9 -54.2 -54.0 64 -99 SPO 1997 04 11 07 29 23 8.7 -9 669.50 -53.9 -54.2 -54.0 64 -99 SPO 1997 04 11 07 30 23 8.6 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 31 24 9.2 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 32 23 8.3 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 33 24 8.6 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 34 24 8.7 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 35 24 9.1 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 36 24 9.5 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 37 24 8.7 -9 669.60 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 38 24 9.1 -9 669.60 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 39 24 9.2 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 40 24 8.6 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 41 23 9.1 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 42 23 9.2 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 43 24 9.2 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 44 25 8.6 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 45 24 9.7 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 46 23 9.4 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 47 24 9.0 -9 669.60 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 48 23 9.6 -9 669.50 -53.9 -54.2 -54.0 66 -99 SPO 1997 04 11 07 49 23 9.3 -9 669.50 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 11 07 50 23 10.6 -9 669.50 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 51 23 9.5 -9 669.50 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 52 24 9.3 -9 669.50 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 11 07 53 26 8.9 -9 669.50 -53.9 -54.1 -54.0 66 -99 SPO 1997 04 11 07 54 26 9.4 -9 669.40 -53.9 -54.1 -54.0 66 -99 SPO 1997 04 11 07 55 23 10.1 -9 669.40 -53.8 -54.1 -54.0 66 -99 SPO 1997 04 11 07 56 24 9.7 -9 669.40 -53.8 -54.1 -54.0 67 -99 SPO 1997 04 11 07 57 25 9.3 -9 669.50 -53.8 -54.1 -54.0 67 -99 SPO 1997 04 11 07 58 25 8.9 -9 669.50 -53.8 -54.1 -54.0 66 -99 SPO 1997 04 11 07 59 26 9.2 -9 669.50 -53.8 -54.1 -54.0 66 -99 SPO 1997 04 11 08 00 27 8.9 -9 669.50 -53.8 -54.1 -53.9 66 0 SPO 1997 04 11 08 01 25 10.0 -9 669.50 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 02 26 10.4 -9 669.50 -53.8 -54.1 -53.9 65 -99 SPO 1997 04 11 08 03 24 9.9 -9 669.50 -53.8 -54.1 -54.0 65 -99 SPO 1997 04 11 08 04 25 9.8 -9 669.50 -53.8 -54.1 -53.9 65 -99 SPO 1997 04 11 08 05 23 9.3 -9 669.40 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 06 24 9.0 -9 669.50 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 07 25 9.8 -9 669.50 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 08 27 9.3 -9 669.40 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 09 27 9.6 -9 669.40 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 10 26 9.9 -9 669.40 -53.8 -54.0 -53.9 66 -99 SPO 1997 04 11 08 11 25 9.1 -9 669.40 -53.8 -54.0 -53.9 65 -99 SPO 1997 04 11 08 12 27 9.1 -9 669.40 -53.8 -54.0 -53.9 65 -99 SPO 1997 04 11 08 13 26 9.1 -9 669.30 -53.8 -54.0 -53.9 64 -99 SPO 1997 04 11 08 14 26 9.7 -9 669.30 -53.8 -54.0 -53.9 64 -99 SPO 1997 04 11 08 15 27 10.6 -9 669.20 -53.8 -54.0 -53.9 65 -99 SPO 1997 04 11 08 16 27 10.6 -9 669.20 -53.8 -54.0 -53.9 65 -99 SPO 1997 04 11 08 17 26 10.6 -9 669.20 -53.8 -54.1 -53.9 65 -99 SPO 1997 04 11 08 18 26 10.2 -9 669.20 -53.8 -54.1 -53.9 66 -99 SPO 1997 04 11 08 19 27 9.3 -9 669.20 -53.7 -54.1 -53.9 65 -99 SPO 1997 04 11 08 20 25 9.2 -9 669.30 -53.7 -54.1 -53.9 65 -99 SPO 1997 04 11 08 21 25 9.5 -9 669.20 -53.7 -54.1 -53.8 65 -99 SPO 1997 04 11 08 22 25 9.9 -9 669.30 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 11 08 23 26 10.5 -9 669.20 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 11 08 24 28 9.1 -9 669.20 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 11 08 25 27 10.8 -9 669.10 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 11 08 26 26 11.0 -9 669.00 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 11 08 27 26 10.0 -9 669.10 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 28 26 10.1 -9 669.00 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 29 24 10.4 -9 669.10 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 30 24 9.3 -9 669.20 -53.7 -53.9 -53.8 67 -99 SPO 1997 04 11 08 31 24 8.9 -9 669.30 -53.7 -53.9 -53.8 67 -99 SPO 1997 04 11 08 32 25 9.1 -9 669.20 -53.7 -53.9 -53.8 67 -99 SPO 1997 04 11 08 33 22 9.9 -9 669.30 -53.6 -53.9 -53.8 65 -99 SPO 1997 04 11 08 34 22 9.6 -9 669.30 -53.6 -54.0 -53.8 65 -99 SPO 1997 04 11 08 35 22 9.8 -9 669.20 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 36 22 8.7 -9 669.30 -53.6 -54.0 -53.8 65 -99 SPO 1997 04 11 08 37 23 8.4 -9 669.30 -53.6 -54.0 -53.8 64 -99 SPO 1997 04 11 08 38 23 8.2 -9 669.30 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 39 21 9.6 -9 669.30 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 40 19 9.8 -9 669.20 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 41 20 9.5 -9 669.20 -53.7 -54.0 -53.8 66 -99 SPO 1997 04 11 08 42 22 9.5 -9 669.20 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 43 22 8.0 -9 669.20 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 44 19 10.1 -9 669.20 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 45 19 9.7 -9 669.10 -53.6 -53.9 -53.8 65 -99 SPO 1997 04 11 08 46 18 9.2 -9 669.20 -53.6 -53.9 -53.7 64 -99 SPO 1997 04 11 08 47 19 10.2 -9 669.20 -53.6 -53.9 -53.7 64 -99 SPO 1997 04 11 08 48 20 11.0 -9 669.10 -53.6 -53.9 -53.7 64 -99 SPO 1997 04 11 08 49 18 10.7 -9 669.10 -53.6 -53.9 -53.8 64 -99 SPO 1997 04 11 08 50 19 10.2 -9 669.10 -53.6 -53.9 -53.7 64 -99 SPO 1997 04 11 08 51 18 10.5 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 52 17 10.2 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 53 17 10.4 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 54 19 10.1 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 55 17 11.1 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 56 19 10.8 -9 669.10 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 57 20 11.0 -9 669.00 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 08 58 19 10.4 -9 669.00 -53.6 -53.9 -53.7 64 -99 SPO 1997 04 11 08 59 21 10.4 -9 669.10 -53.6 -53.8 -53.7 64 -99 SPO 1997 04 11 09 00 21 10.4 -9 669.10 -53.6 -53.9 -53.7 65 0 SPO 1997 04 11 09 01 20 10.1 -9 669.00 -53.6 -53.9 -53.7 65 -99 SPO 1997 04 11 09 02 19 9.6 -9 669.00 -53.6 -53.8 -53.7 66 -99 SPO 1997 04 11 09 03 20 11.0 -9 669.00 -53.6 -53.8 -53.7 66 -99 SPO 1997 04 11 09 04 18 11.2 -9 669.00 -53.6 -53.8 -53.7 66 -99 SPO 1997 04 11 09 05 18 10.5 -9 669.00 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 11 09 06 17 11.0 -9 669.00 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 11 09 07 18 11.8 -9 669.00 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 11 09 08 17 10.5 -9 669.00 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 11 09 09 17 11.3 -9 669.00 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 11 09 10 17 10.6 -9 669.00 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 11 09 11 16 11.2 -9 669.00 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 11 09 12 16 11.5 -9 669.10 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 11 09 13 17 10.1 -9 669.10 -53.5 -53.8 -53.6 66 -99 SPO 1997 04 11 09 14 17 10.3 -9 669.20 -53.5 -53.8 -53.6 66 -99 SPO 1997 04 11 09 15 15 10.1 -9 669.20 -53.5 -53.8 -53.6 66 -99 SPO 1997 04 11 09 16 17 9.8 -9 669.20 -53.5 -53.8 -53.6 66 -99 SPO 1997 04 11 09 17 17 10.3 -9 669.20 -53.5 -53.8 -53.6 66 -99 SPO 1997 04 11 09 18 17 10.2 -9 669.20 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 11 09 19 18 10.0 -9 669.20 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 11 09 20 16 10.5 -9 669.20 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 11 09 21 19 10.3 -9 669.20 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 11 09 22 19 9.9 -9 669.20 -53.5 -53.7 -53.6 65 -99 SPO 1997 04 11 09 23 19 10.6 -9 669.20 -53.4 -53.7 -53.6 64 -99 SPO 1997 04 11 09 24 18 10.3 -9 669.20 -53.4 -53.7 -53.5 65 -99 SPO 1997 04 11 09 25 18 10.8 -9 669.20 -53.4 -53.7 -53.5 66 -99 SPO 1997 04 11 09 26 17 9.9 -9 669.20 -53.4 -53.7 -53.5 67 -99 SPO 1997 04 11 09 27 18 9.9 -9 669.30 -53.4 -53.7 -53.5 67 -99 SPO 1997 04 11 09 28 18 10.8 -9 669.20 -53.4 -53.7 -53.5 67 -99 SPO 1997 04 11 09 29 18 11.0 -9 669.20 -53.4 -53.7 -53.5 67 -99 SPO 1997 04 11 09 30 18 9.8 -9 669.20 -53.4 -53.7 -53.5 66 -99 SPO 1997 04 11 09 31 20 10.2 -9 669.20 -53.4 -53.7 -53.5 66 -99 SPO 1997 04 11 09 32 20 9.9 -9 669.20 -53.4 -53.6 -53.5 66 -99 SPO 1997 04 11 09 33 20 9.4 -9 669.20 -53.4 -53.6 -53.5 66 -99 SPO 1997 04 11 09 34 22 9.2 -9 669.20 -53.4 -53.6 -53.4 66 -99 SPO 1997 04 11 09 35 22 9.7 -9 669.20 -53.3 -53.6 -53.5 66 -99 SPO 1997 04 11 09 36 21 10.0 -9 669.20 -53.3 -53.6 -53.5 66 -99 SPO 1997 04 11 09 37 22 8.7 -9 669.20 -53.3 -53.6 -53.5 67 -99 SPO 1997 04 11 09 38 22 10.0 -9 669.20 -53.3 -53.6 -53.5 67 -99 SPO 1997 04 11 09 39 20 9.2 -9 669.20 -53.3 -53.6 -53.5 67 -99 SPO 1997 04 11 09 40 21 9.7 -9 669.20 -53.3 -53.6 -53.5 66 -99 SPO 1997 04 11 09 41 21 9.5 -9 669.20 -53.3 -53.6 -53.4 66 -99 SPO 1997 04 11 09 42 21 9.8 -9 669.20 -53.3 -53.6 -53.4 66 -99 SPO 1997 04 11 09 43 21 10.1 -9 669.20 -53.3 -53.7 -53.4 65 -99 SPO 1997 04 11 09 44 20 9.9 -9 669.20 -53.3 -53.6 -53.4 65 -99 SPO 1997 04 11 09 45 20 9.5 -9 669.20 -53.3 -53.6 -53.4 65 -99 SPO 1997 04 11 09 46 21 9.7 -9 669.20 -53.3 -53.6 -53.4 66 -99 SPO 1997 04 11 09 47 21 9.3 -9 669.20 -53.3 -53.6 -53.4 66 -99 SPO 1997 04 11 09 48 21 10.8 -9 669.10 -53.3 -53.6 -53.4 67 -99 SPO 1997 04 11 09 49 20 10.3 -9 669.10 -53.2 -53.5 -53.4 67 -99 SPO 1997 04 11 09 50 20 10.5 -9 669.10 -53.2 -53.5 -53.3 67 -99 SPO 1997 04 11 09 51 21 10.0 -9 669.10 -53.2 -53.5 -53.3 67 -99 SPO 1997 04 11 09 52 22 9.9 -9 669.10 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 11 09 53 21 10.5 -9 669.10 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 11 09 54 20 10.1 -9 669.10 -53.1 -53.4 -53.2 66 -99 SPO 1997 04 11 09 55 21 10.6 -9 669.10 -53.1 -53.4 -53.2 66 -99 SPO 1997 04 11 09 56 22 10.5 -9 669.10 -53.1 -53.4 -53.2 66 -99 SPO 1997 04 11 09 57 21 11.0 -9 669.10 -53.1 -53.3 -53.2 66 -99 SPO 1997 04 11 09 58 20 10.4 -9 669.20 -53.1 -53.3 -53.2 67 -99 SPO 1997 04 11 09 59 21 9.9 -9 669.20 -53.0 -53.3 -53.1 67 -99 SPO 1997 04 11 10 00 21 10.2 -9 669.10 -53.0 -53.3 -53.1 67 0 SPO 1997 04 11 10 01 21 11.0 -9 669.10 -53.0 -53.3 -53.1 68 -99 SPO 1997 04 11 10 02 22 9.9 -9 669.10 -53.0 -53.3 -53.1 68 -99 SPO 1997 04 11 10 03 21 10.2 -9 669.10 -53.0 -53.3 -53.1 68 -99 SPO 1997 04 11 10 04 21 10.7 -9 669.10 -53.0 -53.3 -53.0 68 -99 SPO 1997 04 11 10 05 22 10.9 -9 669.10 -53.0 -53.2 -53.0 68 -99 SPO 1997 04 11 10 06 23 10.8 -9 669.00 -52.9 -53.2 -53.0 67 -99 SPO 1997 04 11 10 07 22 9.9 -9 669.00 -52.9 -53.2 -53.0 66 -99 SPO 1997 04 11 10 08 23 10.9 -9 669.00 -52.9 -53.1 -53.0 66 -99 SPO 1997 04 11 10 09 22 10.8 -9 669.00 -52.8 -53.1 -53.0 66 -99 SPO 1997 04 11 10 10 22 10.0 -9 669.00 -52.8 -53.1 -53.0 67 -99 SPO 1997 04 11 10 11 23 10.1 -9 669.00 -52.8 -53.1 -52.9 67 -99 SPO 1997 04 11 10 12 23 10.1 -9 669.00 -52.8 -53.1 -52.9 68 -99 SPO 1997 04 11 10 13 23 9.5 -9 669.00 -52.8 -53.0 -52.9 68 -99 SPO 1997 04 11 10 14 23 11.0 -9 668.90 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 10 15 22 10.3 -9 668.90 -52.7 -53.0 -52.9 67 -99 SPO 1997 04 11 10 16 22 10.4 -9 668.90 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 10 17 22 10.4 -9 668.90 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 10 18 22 10.4 -9 668.90 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 10 19 21 10.7 -9 668.90 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 10 20 22 10.3 -9 668.90 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 10 21 22 10.7 -9 668.90 -52.6 -53.0 -52.7 65 -99 SPO 1997 04 11 10 22 22 10.4 -9 668.90 -52.6 -52.9 -52.7 65 -99 SPO 1997 04 11 10 23 20 11.7 -9 668.90 -52.6 -52.9 -52.7 65 -99 SPO 1997 04 11 10 24 20 10.8 -9 668.90 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 10 25 21 10.5 -9 668.90 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 10 26 21 10.7 -9 668.90 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 11 10 27 22 11.3 -9 668.90 -52.5 -52.8 -52.7 65 -99 SPO 1997 04 11 10 28 21 10.7 -9 668.90 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 10 29 21 11.3 -9 668.90 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 10 30 22 10.8 -9 668.90 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 10 31 20 10.5 -9 668.90 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 10 32 21 10.1 -9 668.90 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 10 33 20 10.1 -9 668.90 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 10 34 21 10.3 -9 669.00 -52.4 -52.8 -52.5 65 -99 SPO 1997 04 11 10 35 22 9.9 -9 668.90 -52.4 -52.8 -52.5 66 -99 SPO 1997 04 11 10 36 23 10.4 -9 669.00 -52.4 -52.8 -52.5 66 -99 SPO 1997 04 11 10 37 23 10.4 -9 669.00 -52.4 -52.7 -52.5 66 -99 SPO 1997 04 11 10 38 22 10.4 -9 669.00 -52.4 -52.7 -52.5 65 -99 SPO 1997 04 11 10 39 22 9.5 -9 669.00 -52.4 -52.7 -52.5 65 -99 SPO 1997 04 11 10 40 23 9.1 -9 669.00 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 10 41 20 10.4 -9 668.90 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 10 42 20 10.4 -9 668.90 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 10 43 20 11.2 -9 668.90 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 10 44 20 10.2 -9 668.90 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 10 45 19 11.3 -9 668.90 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 10 46 19 11.3 -9 668.90 -52.3 -52.5 -52.4 66 -99 SPO 1997 04 11 10 47 20 11.2 -9 668.90 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 11 10 48 21 10.5 -9 668.90 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 11 10 49 22 10.9 -9 668.90 -52.2 -52.5 -52.4 66 -99 SPO 1997 04 11 10 50 22 10.0 -9 668.90 -52.3 -52.6 -52.4 67 -99 SPO 1997 04 11 10 51 21 9.9 -9 668.80 -52.2 -52.6 -52.4 66 -99 SPO 1997 04 11 10 52 21 10.8 -9 668.90 -52.2 -52.6 -52.4 66 -99 SPO 1997 04 11 10 53 21 11.6 -9 668.80 -52.2 -52.6 -52.4 65 -99 SPO 1997 04 11 10 54 20 10.9 -9 668.80 -52.2 -52.5 -52.4 66 -99 SPO 1997 04 11 10 55 20 10.7 -9 668.80 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 10 56 21 11.0 -9 668.80 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 10 57 21 10.5 -9 668.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 10 58 20 10.7 -9 668.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 10 59 21 11.1 -9 668.90 -52.1 -52.4 -52.2 67 -99 SPO 1997 04 11 11 00 21 11.0 -9 668.90 -52.1 -52.4 -52.2 67 0 SPO 1997 04 11 11 01 22 10.8 -9 668.90 -52.1 -52.4 -52.2 66 -99 SPO 1997 04 11 11 02 23 11.2 -9 668.90 -52.1 -52.4 -52.2 65 -99 SPO 1997 04 11 11 03 24 10.8 -9 668.90 -52.1 -52.3 -52.2 65 -99 SPO 1997 04 11 11 04 24 11.1 -9 668.90 -52.1 -52.3 -52.2 65 -99 SPO 1997 04 11 11 05 24 10.8 -9 668.90 -52.1 -52.3 -52.2 65 -99 SPO 1997 04 11 11 06 25 10.1 -9 668.90 -52.1 -52.3 -52.2 65 -99 SPO 1997 04 11 11 07 22 10.9 -9 668.90 -52.1 -52.3 -52.2 66 -99 SPO 1997 04 11 11 08 21 11.2 -9 668.90 -52.1 -52.3 -52.2 67 -99 SPO 1997 04 11 11 09 21 11.2 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 10 22 10.1 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 11 24 10.9 -9 669.00 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 11 12 23 10.8 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 13 23 9.8 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 14 25 10.3 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 15 24 9.9 -9 668.90 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 11 16 24 9.7 -9 668.90 -52.0 -52.3 -52.0 66 -99 SPO 1997 04 11 11 17 24 10.3 -9 668.90 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 18 25 9.4 -9 669.00 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 11 19 25 9.6 -9 669.00 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 11 20 23 10.3 -9 669.00 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 11 21 25 9.3 -9 669.00 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 11 22 25 9.2 -9 669.00 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 11 23 25 9.8 -9 669.10 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 11 24 25 9.8 -9 669.10 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 11 25 26 9.7 -9 669.00 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 11 26 26 9.5 -9 669.00 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 11 27 26 9.5 -9 669.10 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 11 28 26 9.9 -9 669.00 -51.9 -52.3 -52.0 66 -99 SPO 1997 04 11 11 29 25 9.4 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 30 26 8.9 -9 669.00 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 11 31 25 9.4 -9 669.00 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 11 32 25 9.6 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 33 26 8.8 -9 669.10 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 34 27 9.4 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 35 28 9.3 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 36 29 9.5 -9 669.10 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 37 28 8.8 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 38 30 8.8 -9 669.00 -51.9 -52.1 -52.0 66 -99 SPO 1997 04 11 11 39 31 9.4 -9 669.00 -51.8 -52.1 -52.0 65 -99 SPO 1997 04 11 11 40 30 9.8 -9 669.00 -51.8 -52.1 -52.0 65 -99 SPO 1997 04 11 11 41 29 9.0 -9 669.00 -51.8 -52.2 -52.0 65 -99 SPO 1997 04 11 11 42 27 9.4 -9 669.00 -51.8 -52.2 -52.0 65 -99 SPO 1997 04 11 11 43 26 9.3 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 44 27 9.6 -9 669.00 -51.8 -52.2 -52.0 66 -99 SPO 1997 04 11 11 45 27 9.0 -9 669.10 -51.8 -52.2 -52.0 66 -99 SPO 1997 04 11 11 46 29 8.6 -9 669.00 -51.8 -52.2 -52.0 66 -99 SPO 1997 04 11 11 47 28 8.9 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 48 28 8.9 -9 669.00 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 11 49 29 9.1 -9 669.00 -51.8 -52.1 -52.0 65 -99 SPO 1997 04 11 11 50 29 9.7 -9 669.00 -51.8 -52.1 -51.9 65 -99 SPO 1997 04 11 11 51 28 9.2 -9 669.00 -51.8 -52.1 -51.9 65 -99 SPO 1997 04 11 11 52 28 9.7 -9 669.00 -51.8 -52.1 -51.9 65 -99 SPO 1997 04 11 11 53 28 8.4 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 11 54 28 9.0 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 11 55 28 9.4 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 11 56 28 9.8 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 11 57 27 9.9 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 11 58 28 8.5 -9 669.00 -51.8 -52.1 -51.9 65 -99 SPO 1997 04 11 11 59 27 9.1 -9 669.00 -51.7 -52.1 -51.9 64 -99 SPO 1997 04 11 12 00 25 9.0 -9 669.00 -51.8 -52.1 -51.9 65 0 SPO 1997 04 11 12 01 24 9.1 -9 669.00 -51.7 -52.1 -51.8 64 -99 SPO 1997 04 11 12 02 23 9.3 -9 669.00 -51.7 -52.0 -51.8 64 -99 SPO 1997 04 11 12 03 23 10.0 -9 669.00 -51.7 -52.0 -51.8 65 -99 SPO 1997 04 11 12 04 22 9.4 -9 669.00 -51.7 -52.0 -51.8 65 -99 SPO 1997 04 11 12 05 21 10.0 -9 669.00 -51.7 -52.0 -51.7 65 -99 SPO 1997 04 11 12 06 21 10.2 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 07 21 9.8 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 08 23 9.2 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 09 22 9.8 -9 669.00 -51.6 -52.0 -51.8 65 -99 SPO 1997 04 11 12 10 21 9.8 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 11 21 9.2 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 12 21 10.0 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 13 20 9.8 -9 669.00 -51.7 -51.9 -51.8 65 -99 SPO 1997 04 11 12 14 19 10.1 -9 669.00 -51.7 -51.9 -51.8 65 -99 SPO 1997 04 11 12 15 19 10.5 -9 669.00 -51.7 -51.9 -51.8 65 -99 SPO 1997 04 11 12 16 19 9.7 -9 669.00 -51.7 -52.0 -51.8 65 -99 SPO 1997 04 11 12 17 18 10.3 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 18 20 9.8 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 19 20 9.8 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 20 18 10.4 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 21 18 9.0 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 22 19 9.7 -9 668.90 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 23 18 10.1 -9 669.00 -51.7 -52.0 -51.8 66 -99 SPO 1997 04 11 12 24 19 9.5 -9 669.00 -51.7 -52.0 -51.8 65 -99 SPO 1997 04 11 12 25 18 9.9 -9 669.10 -51.7 -52.0 -51.8 65 -99 SPO 1997 04 11 12 26 19 10.1 -9 669.10 -51.7 -51.9 -51.8 65 -99 SPO 1997 04 11 12 27 19 9.4 -9 669.10 -51.7 -51.9 -51.8 65 -99 SPO 1997 04 11 12 28 17 10.2 -9 669.10 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 29 17 9.8 -9 669.10 -51.6 -51.9 -51.7 66 -99 SPO 1997 04 11 12 30 17 9.7 -9 669.10 -51.6 -51.8 -51.7 66 -99 SPO 1997 04 11 12 31 18 9.4 -9 669.10 -51.6 -51.8 -51.7 66 -99 SPO 1997 04 11 12 32 17 9.4 -9 669.10 -51.6 -51.8 -51.7 66 -99 SPO 1997 04 11 12 33 19 8.9 -9 669.20 -51.6 -51.8 -51.7 66 -99 SPO 1997 04 11 12 34 20 9.2 -9 669.20 -51.6 -51.9 -51.7 65 -99 SPO 1997 04 11 12 35 20 9.6 -9 669.10 -51.6 -51.9 -51.7 65 -99 SPO 1997 04 11 12 36 18 9.6 -9 669.20 -51.6 -52.0 -51.8 65 -99 SPO 1997 04 11 12 37 19 9.7 -9 669.20 -51.6 -52.0 -51.8 65 -99 SPO 1997 04 11 12 38 19 9.6 -9 669.10 -51.6 -52.0 -51.7 66 -99 SPO 1997 04 11 12 39 18 10.2 -9 669.10 -51.6 -51.9 -51.7 65 -99 SPO 1997 04 11 12 40 17 9.2 -9 669.10 -51.6 -51.9 -51.8 66 -99 SPO 1997 04 11 12 41 18 9.5 -9 669.10 -51.6 -51.9 -51.7 66 -99 SPO 1997 04 11 12 42 15 9.6 -9 669.10 -51.6 -51.9 -51.7 66 -99 SPO 1997 04 11 12 43 15 10.2 -9 669.10 -51.6 -51.9 -51.8 66 -99 SPO 1997 04 11 12 44 16 11.0 -9 669.10 -51.6 -51.9 -51.8 66 -99 SPO 1997 04 11 12 45 16 9.9 -9 669.10 -51.6 -51.9 -51.8 66 -99 SPO 1997 04 11 12 46 18 9.8 -9 669.00 -51.6 -51.9 -51.8 66 -99 SPO 1997 04 11 12 47 16 10.1 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 48 18 10.2 -9 669.00 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 49 18 10.1 -9 669.10 -51.6 -51.9 -51.8 65 -99 SPO 1997 04 11 12 50 19 10.4 -9 669.10 -51.7 -51.9 -51.8 66 -99 SPO 1997 04 11 12 51 19 10.0 -9 669.00 -51.7 -52.0 -51.9 66 -99 SPO 1997 04 11 12 52 19 10.3 -9 669.00 -51.7 -52.1 -51.9 66 -99 SPO 1997 04 11 12 53 18 10.7 -9 669.00 -51.7 -52.1 -51.9 66 -99 SPO 1997 04 11 12 54 18 10.8 -9 669.10 -51.7 -52.1 -51.9 66 -99 SPO 1997 04 11 12 55 17 10.7 -9 669.00 -51.7 -52.0 -51.9 66 -99 SPO 1997 04 11 12 56 17 10.7 -9 669.10 -51.8 -52.0 -51.8 67 -99 SPO 1997 04 11 12 57 16 10.1 -9 669.10 -51.8 -52.0 -51.8 66 -99 SPO 1997 04 11 12 58 18 9.7 -9 669.10 -51.7 -52.0 -51.9 66 -99 SPO 1997 04 11 12 59 19 10.5 -9 669.10 -51.7 -52.0 -51.9 66 -99 SPO 1997 04 11 13 00 20 10.1 -9 669.20 -51.8 -52.0 -51.9 66 0 SPO 1997 04 11 13 01 20 10.3 -9 669.20 -51.8 -52.0 -51.9 67 -99 SPO 1997 04 11 13 02 22 9.1 -9 669.20 -51.8 -52.0 -52.0 67 -99 SPO 1997 04 11 13 03 22 9.9 -9 669.20 -51.8 -52.1 -52.0 66 -99 SPO 1997 04 11 13 04 20 9.8 -9 669.20 -51.8 -52.1 -52.1 66 -99 SPO 1997 04 11 13 05 19 10.1 -9 669.20 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 13 06 19 10.0 -9 669.10 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 13 07 16 10.2 -9 669.10 -51.9 -52.2 -52.2 66 -99 SPO 1997 04 11 13 08 16 10.6 -9 669.10 -52.0 -52.2 -52.2 66 -99 SPO 1997 04 11 13 09 18 10.2 -9 669.10 -52.0 -52.3 -52.2 65 -99 SPO 1997 04 11 13 10 20 9.5 -9 669.10 -52.1 -52.4 -52.3 65 -99 SPO 1997 04 11 13 11 20 10.6 -9 669.10 -52.1 -52.4 -52.3 65 -99 SPO 1997 04 11 13 12 20 10.0 -9 669.10 -52.1 -52.4 -52.3 65 -99 SPO 1997 04 11 13 13 21 9.7 -9 669.10 -52.2 -52.5 -52.4 65 -99 SPO 1997 04 11 13 14 22 10.3 -9 669.10 -52.2 -52.5 -52.4 65 -99 SPO 1997 04 11 13 15 22 10.9 -9 669.10 -52.3 -52.5 -52.5 66 -99 SPO 1997 04 11 13 16 21 11.3 -9 669.10 -52.3 -52.6 -52.5 65 -99 SPO 1997 04 11 13 17 21 10.0 -9 669.10 -52.3 -52.6 -52.5 65 -99 SPO 1997 04 11 13 18 22 9.5 -9 669.10 -52.3 -52.6 -52.5 65 -99 SPO 1997 04 11 13 19 22 9.3 -9 669.20 -52.4 -52.6 -52.6 65 -99 SPO 1997 04 11 13 20 22 9.6 -9 669.10 -52.4 -52.7 -52.6 65 -99 SPO 1997 04 11 13 21 23 9.8 -9 669.20 -52.4 -52.7 -52.6 65 -99 SPO 1997 04 11 13 22 23 9.4 -9 669.10 -52.5 -52.7 -52.7 65 -99 SPO 1997 04 11 13 23 23 9.6 -9 669.20 -52.5 -52.7 -52.7 65 -99 SPO 1997 04 11 13 24 23 10.2 -9 669.20 -52.5 -52.7 -52.7 65 -99 SPO 1997 04 11 13 25 23 9.5 -9 669.20 -52.6 -52.8 -52.7 65 -99 SPO 1997 04 11 13 26 23 9.6 -9 669.20 -52.6 -52.8 -52.7 65 -99 SPO 1997 04 11 13 27 21 10.2 -9 669.10 -52.6 -52.9 -52.7 65 -99 SPO 1997 04 11 13 28 21 10.2 -9 669.10 -52.6 -52.9 -52.8 65 -99 SPO 1997 04 11 13 29 21 10.0 -9 669.10 -52.6 -52.9 -52.8 65 -99 SPO 1997 04 11 13 30 21 9.3 -9 669.00 -52.6 -52.9 -52.8 65 -99 SPO 1997 04 11 13 31 20 9.7 -9 669.10 -52.7 -52.9 -52.8 65 -99 SPO 1997 04 11 13 32 20 9.3 -9 669.00 -52.7 -52.9 -52.9 65 -99 SPO 1997 04 11 13 33 19 9.9 -9 669.00 -52.7 -52.9 -52.9 65 -99 SPO 1997 04 11 13 34 20 9.5 -9 669.10 -52.7 -53.0 -52.9 65 -99 SPO 1997 04 11 13 35 19 9.6 -9 669.10 -52.7 -53.0 -52.9 65 -99 SPO 1997 04 11 13 36 20 10.1 -9 669.10 -52.7 -52.9 -52.9 65 -99 SPO 1997 04 11 13 37 20 9.7 -9 669.00 -52.7 -52.9 -52.9 66 -99 SPO 1997 04 11 13 38 20 9.8 -9 669.00 -52.7 -52.9 -52.9 66 -99 SPO 1997 04 11 13 39 19 10.1 -9 669.00 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 13 40 19 10.3 -9 669.00 -52.7 -52.9 -52.8 67 -99 SPO 1997 04 11 13 41 19 10.1 -9 669.00 -52.7 -52.9 -52.8 67 -99 SPO 1997 04 11 13 42 16 10.6 -9 669.00 -52.7 -52.8 -52.8 66 -99 SPO 1997 04 11 13 43 16 10.4 -9 668.90 -52.7 -52.9 -52.8 66 -99 SPO 1997 04 11 13 44 14 11.1 -9 668.90 -52.7 -52.9 -52.8 66 -99 SPO 1997 04 11 13 45 14 10.9 -9 668.80 -52.7 -52.9 -52.8 66 -99 SPO 1997 04 11 13 46 13 10.9 -9 668.80 -52.7 -52.9 -52.8 67 -99 SPO 1997 04 11 13 47 11 11.3 -9 668.70 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 13 48 12 11.5 -9 668.70 -52.7 -52.8 -52.7 68 -99 SPO 1997 04 11 13 49 13 11.3 -9 668.70 -52.6 -52.8 -52.8 68 -99 SPO 1997 04 11 13 50 15 10.6 -9 668.80 -52.6 -52.8 -52.8 69 -99 SPO 1997 04 11 13 51 15 11.3 -9 668.80 -52.6 -52.8 -52.8 69 -99 SPO 1997 04 11 13 52 14 11.3 -9 668.80 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 13 53 13 11.0 -9 668.80 -52.7 -52.8 -52.9 69 -99 SPO 1997 04 11 13 54 12 11.2 -9 668.80 -52.7 -52.9 -52.9 69 -99 SPO 1997 04 11 13 55 12 10.6 -9 668.80 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 13 56 11 11.1 -9 668.70 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 13 57 11 10.8 -9 668.70 -52.7 -52.8 -52.8 67 -99 SPO 1997 04 11 13 58 11 11.6 -9 668.70 -52.7 -52.7 -52.8 67 -99 SPO 1997 04 11 13 59 11 11.6 -9 668.60 -52.7 -52.7 -52.8 67 -99 SPO 1997 04 11 14 00 11 11.8 -9 668.70 -52.6 -52.7 -52.7 67 0 SPO 1997 04 11 14 01 10 11.2 -9 668.70 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 14 02 11 11.4 -9 668.60 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 14 03 11 11.6 -9 668.60 -52.6 -52.7 -52.8 69 -99 SPO 1997 04 11 14 04 11 12.1 -9 668.60 -52.6 -52.7 -52.8 69 -99 SPO 1997 04 11 14 05 11 11.3 -9 668.60 -52.6 -52.8 -52.8 69 -99 SPO 1997 04 11 14 06 12 11.4 -9 668.60 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 14 07 11 11.1 -9 668.60 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 14 08 10 10.9 -9 668.60 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 14 09 11 11.0 -9 668.60 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 14 10 12 10.7 -9 668.60 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 14 11 12 10.9 -9 668.60 -52.7 -52.7 -52.9 69 -99 SPO 1997 04 11 14 12 12 11.4 -9 668.60 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 14 13 12 11.2 -9 668.60 -52.7 -52.7 -52.9 69 -99 SPO 1997 04 11 14 14 13 10.6 -9 668.70 -52.7 -52.7 -52.9 69 -99 SPO 1997 04 11 14 15 12 11.2 -9 668.60 -52.7 -52.7 -52.9 69 -99 SPO 1997 04 11 14 16 12 11.5 -9 668.60 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 14 17 10 11.4 -9 668.60 -52.7 -52.7 -52.8 68 -99 SPO 1997 04 11 14 18 10 11.2 -9 668.60 -52.7 -52.7 -52.9 68 -99 SPO 1997 04 11 14 19 9 11.9 -9 668.60 -52.7 -52.8 -52.8 67 -99 SPO 1997 04 11 14 20 9 11.5 -9 668.60 -52.7 -52.8 -52.8 67 -99 SPO 1997 04 11 14 21 9 11.6 -9 668.60 -52.7 -52.8 -52.9 68 -99 SPO 1997 04 11 14 22 9 11.6 -9 668.50 -52.7 -52.8 -52.9 68 -99 SPO 1997 04 11 14 23 9 11.9 -9 668.60 -52.8 -52.7 -52.9 69 -99 SPO 1997 04 11 14 24 11 12.0 -9 668.60 -52.8 -52.7 -52.8 69 -99 SPO 1997 04 11 14 25 10 11.7 -9 668.50 -52.8 -52.7 -52.9 69 -99 SPO 1997 04 11 14 26 9 11.5 -9 668.60 -52.8 -52.8 -52.9 69 -99 SPO 1997 04 11 14 27 10 12.0 -9 668.50 -52.8 -52.7 -52.9 69 -99 SPO 1997 04 11 14 28 9 11.7 -9 668.50 -52.8 -52.7 -52.9 69 -99 SPO 1997 04 11 14 29 9 11.9 -9 668.50 -52.8 -52.7 -52.9 68 -99 SPO 1997 04 11 14 30 9 11.5 -9 668.50 -52.8 -52.7 -52.9 67 -99 SPO 1997 04 11 14 31 9 11.7 -9 668.50 -52.8 -52.7 -53.0 67 -99 SPO 1997 04 11 14 32 10 11.5 -9 668.60 -52.8 -52.7 -53.0 67 -99 SPO 1997 04 11 14 33 10 11.3 -9 668.60 -52.8 -52.7 -52.9 67 -99 SPO 1997 04 11 14 34 10 11.2 -9 668.50 -52.8 -52.8 -53.0 68 -99 SPO 1997 04 11 14 35 11 11.8 -9 668.50 -52.8 -52.8 -53.0 69 -99 SPO 1997 04 11 14 36 11 11.7 -9 668.60 -52.8 -52.8 -53.0 69 -99 SPO 1997 04 11 14 37 12 11.5 -9 668.60 -52.8 -52.9 -53.0 69 -99 SPO 1997 04 11 14 38 13 11.4 -9 668.60 -52.9 -52.9 -53.0 70 -99 SPO 1997 04 11 14 39 14 11.1 -9 668.50 -52.9 -53.0 -53.1 69 -99 SPO 1997 04 11 14 40 13 11.4 -9 668.60 -53.0 -53.0 -53.1 69 -99 SPO 1997 04 11 14 41 13 11.7 -9 668.60 -53.0 -53.0 -53.1 68 -99 SPO 1997 04 11 14 42 12 12.0 -9 668.60 -53.0 -52.9 -53.1 68 -99 SPO 1997 04 11 14 43 12 11.6 -9 668.60 -53.0 -52.9 -53.1 68 -99 SPO 1997 04 11 14 44 12 11.6 -9 668.50 -53.0 -52.9 -53.1 68 -99 SPO 1997 04 11 14 45 12 11.3 -9 668.60 -53.0 -52.9 -53.1 68 -99 SPO 1997 04 11 14 46 14 10.8 -9 668.60 -53.0 -53.0 -53.1 68 -99 SPO 1997 04 11 14 47 15 10.9 -9 668.60 -53.0 -53.0 -53.2 68 -99 SPO 1997 04 11 14 48 15 11.2 -9 668.60 -53.0 -53.0 -53.2 68 -99 SPO 1997 04 11 14 49 15 11.4 -9 668.60 -53.0 -53.0 -53.2 68 -99 SPO 1997 04 11 14 50 14 11.0 -9 668.60 -53.1 -53.0 -53.2 69 -99 SPO 1997 04 11 14 51 14 11.2 -9 668.60 -53.1 -53.0 -53.2 69 -99 SPO 1997 04 11 14 52 14 11.1 -9 668.60 -53.1 -53.1 -53.2 68 -99 SPO 1997 04 11 14 53 15 11.1 -9 668.60 -53.1 -53.1 -53.2 68 -99 SPO 1997 04 11 14 54 15 10.8 -9 668.60 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 11 14 55 15 10.1 -9 668.70 -53.1 -53.2 -53.3 68 -99 SPO 1997 04 11 14 56 15 10.5 -9 668.60 -53.1 -53.2 -53.3 68 -99 SPO 1997 04 11 14 57 15 10.3 -9 668.60 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 11 14 58 14 10.5 -9 668.60 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 11 14 59 15 10.7 -9 668.60 -53.1 -53.1 -53.3 68 -99 SPO 1997 04 11 15 00 15 10.7 -9 668.60 -53.1 -53.1 -53.2 68 0 SPO 1997 04 11 15 01 13 10.3 -9 668.60 -53.1 -53.2 -53.3 68 -99 SPO 1997 04 11 15 02 13 10.9 -9 668.60 -53.2 -53.1 -53.3 68 -99 SPO 1997 04 11 15 03 13 11.2 -9 668.60 -53.2 -53.1 -53.3 68 -99 SPO 1997 04 11 15 04 13 10.9 -9 668.60 -53.2 -53.1 -53.2 68 -99 SPO 1997 04 11 15 05 13 11.6 -9 668.60 -53.2 -53.1 -53.2 68 -99 SPO 1997 04 11 15 06 13 11.5 -9 668.50 -53.1 -53.1 -53.2 68 -99 SPO 1997 04 11 15 07 14 11.6 -9 668.50 -53.1 -53.1 -53.3 68 -99 SPO 1997 04 11 15 08 13 11.6 -9 668.60 -53.1 -53.1 -53.3 68 -99 SPO 1997 04 11 15 09 14 11.4 -9 668.60 -53.1 -53.1 -53.2 68 -99 SPO 1997 04 11 15 10 13 11.8 -9 668.60 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 11 15 11 14 11.9 -9 668.60 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 11 15 12 14 11.4 -9 668.60 -53.1 -53.2 -53.3 69 -99 SPO 1997 04 11 15 13 13 11.8 -9 668.60 -53.2 -53.2 -53.3 69 -99 SPO 1997 04 11 15 14 13 11.4 -9 668.60 -53.2 -53.2 -53.3 69 -99 SPO 1997 04 11 15 15 14 11.0 -9 668.60 -53.2 -53.3 -53.4 68 -99 SPO 1997 04 11 15 16 15 11.7 -9 668.60 -53.2 -53.2 -53.3 68 -99 SPO 1997 04 11 15 17 15 11.5 -9 668.60 -53.2 -53.2 -53.3 68 -99 SPO 1997 04 11 15 18 16 10.6 -9 668.60 -53.2 -53.3 -53.4 68 -99 SPO 1997 04 11 15 19 17 10.5 -9 668.60 -53.2 -53.2 -53.4 69 -99 SPO 1997 04 11 15 20 16 10.9 -9 668.70 -53.3 -53.3 -53.4 70 -99 SPO 1997 04 11 15 21 15 10.7 -9 668.70 -53.3 -53.2 -53.4 70 -99 SPO 1997 04 11 15 22 15 10.7 -9 668.70 -53.2 -53.2 -53.4 69 -99 SPO 1997 04 11 15 23 15 10.7 -9 668.70 -53.3 -53.3 -53.4 69 -99 SPO 1997 04 11 15 24 15 10.7 -9 668.70 -53.3 -53.3 -53.4 69 -99 SPO 1997 04 11 15 25 16 11.0 -9 668.70 -53.3 -53.3 -53.4 68 -99 SPO 1997 04 11 15 26 15 10.8 -9 668.70 -53.3 -53.3 -53.4 68 -99 SPO 1997 04 11 15 27 16 11.1 -9 668.70 -53.3 -53.3 -53.4 68 -99 SPO 1997 04 11 15 28 16 10.9 -9 668.70 -53.3 -53.4 -53.4 68 -99 SPO 1997 04 11 15 29 15 10.8 -9 668.70 -53.3 -53.4 -53.4 68 -99 SPO 1997 04 11 15 30 15 10.6 -9 668.70 -53.2 -53.3 -53.3 68 -99 SPO 1997 04 11 15 31 16 9.7 -9 668.80 -53.2 -53.4 -53.4 68 -99 SPO 1997 04 11 15 32 17 9.9 -9 668.80 -53.3 -53.4 -53.3 69 -99 SPO 1997 04 11 15 33 18 9.3 -9 668.80 -53.3 -53.4 -53.4 69 -99 SPO 1997 04 11 15 34 18 9.3 -9 668.90 -53.3 -53.4 -53.4 69 -99 SPO 1997 04 11 15 35 18 9.7 -9 668.80 -53.3 -53.4 -53.4 69 -99 SPO 1997 04 11 15 36 17 10.5 -9 668.80 -53.3 -53.3 -53.3 69 -99 SPO 1997 04 11 15 37 16 10.8 -9 668.70 -53.2 -53.3 -53.3 68 -99 SPO 1997 04 11 15 38 17 10.5 -9 668.70 -53.2 -53.2 -53.3 68 -99 SPO 1997 04 11 15 39 16 10.8 -9 668.70 -53.2 -53.2 -53.3 68 -99 SPO 1997 04 11 15 40 15 10.1 -9 668.70 -53.2 -53.2 -53.3 68 -99 SPO 1997 04 11 15 41 14 10.8 -9 668.70 -53.2 -53.1 -53.2 68 -99 SPO 1997 04 11 15 42 13 10.8 -9 668.60 -53.1 -53.1 -53.2 68 -99 SPO 1997 04 11 15 43 12 11.1 -9 668.70 -53.1 -53.1 -53.1 68 -99 SPO 1997 04 11 15 44 12 11.1 -9 668.70 -53.1 -53.1 -53.1 68 -99 SPO 1997 04 11 15 45 13 10.8 -9 668.70 -53.1 -53.1 -53.1 69 -99 SPO 1997 04 11 15 46 14 10.7 -9 668.70 -53.0 -53.1 -53.1 69 -99 SPO 1997 04 11 15 47 14 10.9 -9 668.70 -53.0 -53.1 -53.1 69 -99 SPO 1997 04 11 15 48 13 11.1 -9 668.70 -53.0 -53.0 -53.0 69 -99 SPO 1997 04 11 15 49 13 10.8 -9 668.80 -53.0 -53.0 -53.0 69 -99 SPO 1997 04 11 15 50 12 10.6 -9 668.80 -53.0 -52.9 -53.0 69 -99 SPO 1997 04 11 15 51 12 10.8 -9 668.80 -52.9 -52.9 -53.0 69 -99 SPO 1997 04 11 15 52 13 10.7 -9 668.80 -52.9 -52.9 -52.9 69 -99 SPO 1997 04 11 15 53 14 10.9 -9 668.90 -52.8 -52.8 -52.9 69 -99 SPO 1997 04 11 15 54 13 10.3 -9 668.90 -52.8 -52.8 -52.9 69 -99 SPO 1997 04 11 15 55 14 10.1 -9 668.90 -52.8 -52.8 -52.8 69 -99 SPO 1997 04 11 15 56 15 9.8 -9 668.90 -52.8 -52.8 -52.8 69 -99 SPO 1997 04 11 15 57 16 9.4 -9 669.00 -52.8 -52.8 -52.9 70 -99 SPO 1997 04 11 15 58 16 9.4 -9 669.00 -52.8 -52.8 -52.8 70 -99 SPO 1997 04 11 15 59 16 9.9 -9 669.00 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 16 00 16 10.1 -9 669.00 -52.7 -52.7 -52.8 69 0 SPO 1997 04 11 16 01 15 9.7 -9 669.00 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 16 02 15 10.7 -9 668.90 -52.7 -52.8 -52.7 69 -99 SPO 1997 04 11 16 03 13 10.7 -9 668.90 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 16 04 12 11.1 -9 668.90 -52.6 -52.7 -52.7 69 -99 SPO 1997 04 11 16 05 12 10.7 -9 668.90 -52.6 -52.7 -52.7 70 -99 SPO 1997 04 11 16 06 12 10.8 -9 668.90 -52.6 -52.7 -52.7 70 -99 SPO 1997 04 11 16 07 16 9.7 -9 668.90 -52.6 -52.7 -52.7 71 -99 SPO 1997 04 11 16 08 19 9.5 -9 669.00 -52.6 -52.7 -52.7 71 -99 SPO 1997 04 11 16 09 20 9.2 -9 669.00 -52.6 -52.7 -52.7 70 -99 SPO 1997 04 11 16 10 18 10.3 -9 669.00 -52.6 -52.7 -52.7 70 -99 SPO 1997 04 11 16 11 18 10.3 -9 668.90 -52.6 -52.7 -52.7 69 -99 SPO 1997 04 11 16 12 17 10.6 -9 668.90 -52.6 -52.7 -52.7 69 -99 SPO 1997 04 11 16 13 17 10.2 -9 668.90 -52.6 -52.7 -52.8 69 -99 SPO 1997 04 11 16 14 19 9.8 -9 669.00 -52.6 -52.7 -52.8 69 -99 SPO 1997 04 11 16 15 20 10.4 -9 669.00 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 16 16 18 10.6 -9 669.00 -52.7 -52.7 -52.8 69 -99 SPO 1997 04 11 16 17 15 11.2 -9 669.00 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 16 18 15 10.8 -9 669.00 -52.7 -52.8 -52.8 69 -99 SPO 1997 04 11 16 19 16 10.1 -9 669.00 -52.7 -52.9 -52.9 69 -99 SPO 1997 04 11 16 20 17 9.4 -9 669.10 -52.7 -52.9 -52.9 69 -99 SPO 1997 04 11 16 21 19 9.3 -9 669.10 -52.7 -52.9 -52.9 69 -99 SPO 1997 04 11 16 22 23 8.7 -9 669.10 -52.8 -53.0 -53.0 69 -99 SPO 1997 04 11 16 23 22 10.3 -9 669.10 -52.8 -53.0 -52.9 68 -99 SPO 1997 04 11 16 24 20 10.2 -9 669.00 -52.8 -53.0 -52.9 68 -99 SPO 1997 04 11 16 25 19 10.2 -9 669.00 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 16 26 19 10.4 -9 669.10 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 16 27 19 9.8 -9 669.10 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 16 28 20 8.9 -9 669.10 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 16 29 24 8.8 -9 669.10 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 11 16 30 21 9.0 -9 669.00 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 11 16 31 16 10.3 -9 669.00 -52.8 -52.9 -52.9 68 -99 SPO 1997 04 11 16 32 15 11.2 -9 668.90 -52.8 -52.9 -52.8 68 -99 SPO 1997 04 11 16 33 15 10.5 -9 669.00 -52.7 -52.8 -52.8 67 -99 SPO 1997 04 11 16 34 16 10.3 -9 669.00 -52.7 -52.8 -52.8 66 -99 SPO 1997 04 11 16 35 18 9.3 -9 669.00 -52.7 -52.9 -52.8 66 -99 SPO 1997 04 11 16 36 17 9.0 -9 669.00 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 16 37 14 9.7 -9 669.00 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 16 38 14 9.7 -9 669.00 -52.7 -53.0 -52.9 67 -99 SPO 1997 04 11 16 39 15 9.8 -9 669.00 -52.7 -53.0 -52.9 67 -99 SPO 1997 04 11 16 40 14 11.0 -9 669.00 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 16 41 11 11.2 -9 668.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 11 16 42 10 11.8 -9 668.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 11 16 43 10 11.5 -9 668.80 -52.7 -52.9 -52.8 69 -99 SPO 1997 04 11 16 44 11 11.0 -9 668.80 -52.7 -52.9 -52.8 69 -99 SPO 1997 04 11 16 45 11 11.8 -9 668.80 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 11 16 46 11 11.4 -9 668.80 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 16 47 11 11.3 -9 668.90 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 16 48 12 10.6 -9 668.90 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 16 49 15 9.9 -9 668.90 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 16 50 17 10.5 -9 669.00 -52.7 -52.8 -52.8 68 -99 SPO 1997 04 11 16 51 16 10.4 -9 669.00 -52.6 -52.8 -52.8 67 -99 SPO 1997 04 11 16 52 17 10.2 -9 669.00 -52.6 -52.9 -52.8 67 -99 SPO 1997 04 11 16 53 17 10.2 -9 669.10 -52.6 -53.0 -52.8 68 -99 SPO 1997 04 11 16 54 18 9.6 -9 669.10 -52.6 -53.0 -52.8 68 -99 SPO 1997 04 11 16 55 18 9.8 -9 669.20 -52.7 -53.0 -52.8 69 -99 SPO 1997 04 11 16 56 18 9.8 -9 669.10 -52.7 -53.0 -52.8 68 -99 SPO 1997 04 11 16 57 19 9.3 -9 669.20 -52.7 -53.0 -52.8 68 -99 SPO 1997 04 11 16 58 18 9.0 -9 669.20 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 16 59 21 8.8 -9 669.20 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 11 17 00 22 9.0 -9 669.20 -52.6 -53.0 -52.8 66 0 SPO 1997 04 11 17 01 21 8.5 -9 669.20 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 17 02 25 9.2 -9 669.10 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 17 03 22 10.1 -9 669.10 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 17 04 25 9.4 -9 669.10 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 17 05 26 9.6 -9 669.10 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 11 17 06 26 9.7 -9 669.10 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 11 17 07 24 10.0 -9 669.20 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 11 17 08 24 9.4 -9 669.20 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 17 09 24 9.3 -9 669.20 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 17 10 23 9.8 -9 669.20 -52.5 -52.9 -52.7 66 -99 SPO 1997 04 11 17 11 22 8.9 -9 669.20 -52.5 -52.9 -52.6 67 -99 SPO 1997 04 11 17 12 24 9.4 -9 669.20 -52.5 -52.9 -52.7 67 -99 SPO 1997 04 11 17 13 25 8.9 -9 669.20 -52.5 -52.9 -52.6 68 -99 SPO 1997 04 11 17 14 27 10.0 -9 669.10 -52.5 -52.9 -52.6 68 -99 SPO 1997 04 11 17 15 23 9.6 -9 669.20 -52.6 -52.9 -52.6 69 -99 SPO 1997 04 11 17 16 24 10.0 -9 669.20 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 17 17 24 11.2 -9 669.20 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 17 18 26 10.3 -9 669.20 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 17 19 25 10.3 -9 669.10 -52.5 -52.9 -52.7 67 -99 SPO 1997 04 11 17 20 25 9.9 -9 669.00 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 11 17 21 25 9.9 -9 669.00 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 11 17 22 26 9.9 -9 669.00 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 11 17 23 26 9.7 -9 669.00 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 11 17 24 25 11.3 -9 669.00 -52.4 -52.8 -52.6 67 -99 SPO 1997 04 11 17 25 28 10.6 -9 668.90 -52.4 -52.8 -52.6 67 -99 SPO 1997 04 11 17 26 25 10.9 -9 669.00 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 17 27 25 10.9 -9 669.00 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 17 28 23 10.1 -9 669.00 -52.4 -52.8 -52.5 67 -99 SPO 1997 04 11 17 29 26 9.8 -9 669.00 -52.4 -52.8 -52.5 68 -99 SPO 1997 04 11 17 30 24 10.0 -9 669.00 -52.4 -52.8 -52.5 68 -99 SPO 1997 04 11 17 31 21 10.3 -9 669.00 -52.4 -52.8 -52.5 67 -99 SPO 1997 04 11 17 32 22 10.7 -9 668.90 -52.4 -52.8 -52.5 67 -99 SPO 1997 04 11 17 33 21 10.9 -9 669.00 -52.4 -52.8 -52.5 67 -99 SPO 1997 04 11 17 34 22 10.5 -9 668.90 -52.4 -52.7 -52.5 67 -99 SPO 1997 04 11 17 35 22 11.5 -9 668.90 -52.3 -52.7 -52.4 66 -99 SPO 1997 04 11 17 36 22 11.2 -9 668.90 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 17 37 23 10.4 -9 668.90 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 17 38 26 9.8 -9 668.90 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 17 39 24 10.7 -9 668.90 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 17 40 22 10.7 -9 668.90 -52.3 -52.6 -52.5 67 -99 SPO 1997 04 11 17 41 24 9.9 -9 668.90 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 17 42 24 10.3 -9 668.90 -52.3 -52.6 -52.4 67 -99 SPO 1997 04 11 17 43 22 10.9 -9 668.90 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 17 44 21 10.1 -9 668.90 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 17 45 20 10.4 -9 668.80 -52.3 -52.7 -52.4 66 -99 SPO 1997 04 11 17 46 20 11.0 -9 668.90 -52.3 -52.7 -52.4 66 -99 SPO 1997 04 11 17 47 19 11.5 -9 668.80 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 17 48 19 11.7 -9 668.80 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 17 49 19 11.3 -9 668.80 -52.3 -52.7 -52.5 68 -99 SPO 1997 04 11 17 50 20 11.2 -9 668.80 -52.3 -52.7 -52.5 68 -99 SPO 1997 04 11 17 51 21 11.5 -9 668.80 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 17 52 20 9.9 -9 668.80 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 17 53 20 10.7 -9 668.80 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 17 54 19 11.4 -9 668.80 -52.3 -52.6 -52.4 67 -99 SPO 1997 04 11 17 55 19 10.6 -9 668.80 -52.2 -52.6 -52.4 66 -99 SPO 1997 04 11 17 56 19 10.8 -9 668.80 -52.2 -52.5 -52.4 66 -99 SPO 1997 04 11 17 57 18 11.0 -9 668.80 -52.2 -52.5 -52.3 66 -99 SPO 1997 04 11 17 58 17 11.7 -9 668.80 -52.2 -52.5 -52.3 66 -99 SPO 1997 04 11 17 59 16 10.8 -9 668.90 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 18 00 19 10.9 -9 668.90 -52.2 -52.5 -52.3 67 0 SPO 1997 04 11 18 01 18 10.6 -9 668.90 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 18 02 19 10.5 -9 668.90 -52.2 -52.6 -52.3 67 -99 SPO 1997 04 11 18 03 19 10.7 -9 669.00 -52.2 -52.6 -52.3 68 -99 SPO 1997 04 11 18 04 19 10.9 -9 669.00 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 18 05 19 10.3 -9 669.00 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 18 06 17 10.7 -9 669.00 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 18 07 17 10.6 -9 669.00 -52.2 -52.5 -52.3 66 -99 SPO 1997 04 11 18 08 16 9.7 -9 669.00 -52.2 -52.5 -52.3 66 -99 SPO 1997 04 11 18 09 19 10.1 -9 669.00 -52.1 -52.5 -52.3 65 -99 SPO 1997 04 11 18 10 17 10.9 -9 669.00 -52.1 -52.4 -52.3 66 -99 SPO 1997 04 11 18 11 17 10.5 -9 669.00 -52.1 -52.4 -52.2 67 -99 SPO 1997 04 11 18 12 18 10.9 -9 669.00 -52.1 -52.4 -52.2 67 -99 SPO 1997 04 11 18 13 17 10.1 -9 669.10 -52.1 -52.4 -52.2 67 -99 SPO 1997 04 11 18 14 18 10.5 -9 669.10 -52.1 -52.4 -52.2 68 -99 SPO 1997 04 11 18 15 16 10.5 -9 669.10 -52.1 -52.4 -52.2 68 -99 SPO 1997 04 11 18 16 17 10.0 -9 669.10 -52.1 -52.3 -52.2 68 -99 SPO 1997 04 11 18 17 19 9.1 -9 669.10 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 18 18 21 9.4 -9 669.10 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 18 19 20 10.0 -9 669.00 -52.0 -52.4 -52.2 66 -99 SPO 1997 04 11 18 20 20 9.6 -9 669.00 -52.0 -52.4 -52.2 66 -99 SPO 1997 04 11 18 21 20 9.9 -9 669.00 -52.0 -52.4 -52.2 66 -99 SPO 1997 04 11 18 22 20 10.3 -9 669.00 -52.0 -52.4 -52.2 67 -99 SPO 1997 04 11 18 23 22 10.6 -9 669.00 -52.0 -52.4 -52.1 67 -99 SPO 1997 04 11 18 24 19 11.8 -9 668.90 -52.0 -52.4 -52.1 67 -99 SPO 1997 04 11 18 25 20 10.8 -9 668.90 -52.0 -52.3 -52.1 68 -99 SPO 1997 04 11 18 26 25 10.2 -9 668.90 -52.0 -52.3 -52.1 69 -99 SPO 1997 04 11 18 27 23 10.8 -9 668.90 -52.0 -52.3 -52.1 69 -99 SPO 1997 04 11 18 28 23 11.1 -9 669.00 -52.0 -52.3 -52.1 68 -99 SPO 1997 04 11 18 29 22 11.1 -9 669.00 -52.0 -52.3 -52.1 68 -99 SPO 1997 04 11 18 30 21 10.1 -9 669.00 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 18 31 21 10.2 -9 669.00 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 18 32 18 10.3 -9 669.00 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 18 33 20 10.8 -9 669.00 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 18 34 19 11.1 -9 669.00 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 18 35 20 11.4 -9 669.00 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 18 36 21 10.8 -9 668.90 -51.9 -52.3 -52.1 67 -99 SPO 1997 04 11 18 37 22 11.0 -9 668.90 -51.9 -52.3 -52.0 68 -99 SPO 1997 04 11 18 38 22 10.2 -9 668.80 -51.9 -52.3 -52.0 68 -99 SPO 1997 04 11 18 39 23 11.3 -9 668.80 -51.9 -52.3 -52.0 68 -99 SPO 1997 04 11 18 40 24 11.2 -9 668.80 -51.9 -52.3 -52.1 68 -99 SPO 1997 04 11 18 41 23 11.4 -9 668.80 -51.9 -52.3 -52.0 67 -99 SPO 1997 04 11 18 42 22 11.6 -9 668.70 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 43 23 12.6 -9 668.70 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 44 22 11.8 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 45 24 11.2 -9 668.70 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 18 46 24 11.7 -9 668.80 -51.9 -52.2 -52.0 67 -99 SPO 1997 04 11 18 47 22 11.6 -9 668.80 -51.9 -52.2 -52.0 68 -99 SPO 1997 04 11 18 48 23 10.3 -9 668.80 -51.9 -52.2 -52.1 69 -99 SPO 1997 04 11 18 49 24 11.1 -9 668.80 -51.9 -52.2 -52.0 69 -99 SPO 1997 04 11 18 50 24 11.5 -9 668.80 -51.9 -52.2 -52.1 69 -99 SPO 1997 04 11 18 51 25 11.6 -9 668.80 -51.9 -52.2 -52.1 68 -99 SPO 1997 04 11 18 52 24 11.5 -9 668.80 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 18 53 24 10.9 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 54 24 10.9 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 55 24 11.0 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 56 23 10.5 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 18 57 23 11.7 -9 668.80 -51.9 -52.3 -52.1 67 -99 SPO 1997 04 11 18 58 23 10.3 -9 668.80 -51.9 -52.3 -52.0 68 -99 SPO 1997 04 11 18 59 22 10.1 -9 668.90 -51.9 -52.3 -52.0 68 -99 SPO 1997 04 11 19 00 25 10.6 -9 668.90 -51.9 -52.3 -52.0 68 0 SPO 1997 04 11 19 01 23 10.1 -9 668.80 -51.9 -52.3 -52.1 68 -99 SPO 1997 04 11 19 02 25 9.9 -9 668.90 -51.9 -52.3 -52.1 67 -99 SPO 1997 04 11 19 03 24 11.1 -9 668.90 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 04 25 11.6 -9 668.90 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 05 23 11.7 -9 668.90 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 19 06 24 11.2 -9 668.90 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 19 07 23 11.2 -9 668.90 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 19 08 24 10.0 -9 668.90 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 19 09 25 10.8 -9 668.90 -51.9 -52.2 -52.0 67 -99 SPO 1997 04 11 19 10 24 11.6 -9 668.80 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 19 11 24 11.9 -9 668.80 -51.9 -52.2 -52.1 68 -99 SPO 1997 04 11 19 12 23 11.2 -9 668.90 -51.9 -52.3 -52.1 68 -99 SPO 1997 04 11 19 13 24 11.8 -9 668.80 -51.9 -52.3 -52.1 67 -99 SPO 1997 04 11 19 14 22 11.2 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 15 22 12.0 -9 668.70 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 16 20 12.2 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 17 21 12.2 -9 668.80 -51.9 -52.3 -52.1 66 -99 SPO 1997 04 11 19 18 21 12.2 -9 668.80 -51.9 -52.2 -52.1 66 -99 SPO 1997 04 11 19 19 21 11.1 -9 668.80 -51.9 -52.2 -52.0 66 -99 SPO 1997 04 11 19 20 21 10.6 -9 668.90 -51.9 -52.2 -52.0 68 -99 SPO 1997 04 11 19 21 22 9.8 -9 668.80 -51.9 -52.2 -51.9 68 -99 SPO 1997 04 11 19 22 21 10.6 -9 668.90 -51.9 -52.2 -52.0 69 -99 SPO 1997 04 11 19 23 22 11.0 -9 668.90 -51.9 -52.2 -52.0 69 -99 SPO 1997 04 11 19 24 22 11.3 -9 668.90 -51.9 -52.1 -52.0 69 -99 SPO 1997 04 11 19 25 21 11.4 -9 668.90 -51.9 -52.1 -52.0 68 -99 SPO 1997 04 11 19 26 20 11.3 -9 668.90 -51.8 -52.1 -52.0 67 -99 SPO 1997 04 11 19 27 21 10.5 -9 669.00 -51.8 -52.1 -52.0 66 -99 SPO 1997 04 11 19 28 20 11.2 -9 669.00 -51.8 -52.1 -52.0 66 -99 SPO 1997 04 11 19 29 20 10.7 -9 669.00 -51.8 -52.1 -51.9 66 -99 SPO 1997 04 11 19 30 17 11.3 -9 669.00 -51.8 -52.2 -51.9 66 -99 SPO 1997 04 11 19 31 18 10.8 -9 669.00 -51.8 -52.2 -52.0 67 -99 SPO 1997 04 11 19 32 19 9.7 -9 669.10 -51.8 -52.2 -51.9 67 -99 SPO 1997 04 11 19 33 18 10.1 -9 669.00 -51.8 -52.2 -51.9 67 -99 SPO 1997 04 11 19 34 19 10.9 -9 669.10 -51.8 -52.2 -51.9 68 -99 SPO 1997 04 11 19 35 19 11.6 -9 669.10 -51.8 -52.2 -52.0 68 -99 SPO 1997 04 11 19 36 20 10.3 -9 669.10 -51.8 -52.2 -52.0 68 -99 SPO 1997 04 11 19 37 19 11.4 -9 669.10 -51.9 -52.2 -52.0 68 -99 SPO 1997 04 11 19 38 18 11.2 -9 669.20 -51.9 -52.2 -52.0 68 -99 SPO 1997 04 11 19 39 19 10.9 -9 669.10 -51.9 -52.2 -52.0 67 -99 SPO 1997 04 11 19 40 19 11.6 -9 669.10 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 19 41 19 11.3 -9 669.10 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 19 42 19 10.9 -9 669.10 -51.9 -52.2 -52.1 67 -99 SPO 1997 04 11 19 43 18 11.0 -9 669.00 -51.9 -52.3 -52.1 67 -99 SPO 1997 04 11 19 44 18 11.2 -9 669.00 -52.0 -52.3 -52.2 69 -99 SPO 1997 04 11 19 45 18 11.4 -9 669.00 -52.0 -52.3 -52.2 68 -99 SPO 1997 04 11 19 46 18 10.9 -9 669.00 -52.0 -52.3 -52.2 67 -99 SPO 1997 04 11 19 47 17 9.5 -9 669.00 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 19 48 19 10.5 -9 669.00 -52.0 -52.3 -52.1 66 -99 SPO 1997 04 11 19 49 18 10.1 -9 669.00 -51.9 -52.3 -52.1 65 -99 SPO 1997 04 11 19 50 18 10.4 -9 669.00 -52.0 -52.4 -52.1 66 -99 SPO 1997 04 11 19 51 17 10.3 -9 669.10 -52.0 -52.4 -52.1 65 -99 SPO 1997 04 11 19 52 17 10.0 -9 669.10 -52.0 -52.4 -52.1 66 -99 SPO 1997 04 11 19 53 19 9.0 -9 669.10 -52.0 -52.4 -52.1 66 -99 SPO 1997 04 11 19 54 16 9.0 -9 669.10 -52.0 -52.3 -52.1 67 -99 SPO 1997 04 11 19 55 17 9.9 -9 669.10 -52.0 -52.3 -52.1 68 -99 SPO 1997 04 11 19 56 19 10.3 -9 669.10 -52.0 -52.3 -52.2 68 -99 SPO 1997 04 11 19 57 19 9.1 -9 669.10 -52.0 -52.4 -52.1 68 -99 SPO 1997 04 11 19 58 19 10.7 -9 669.10 -52.0 -52.4 -52.1 68 -99 SPO 1997 04 11 19 59 19 9.5 -9 669.10 -52.0 -52.3 -52.2 68 -99 SPO 1997 04 11 20 00 18 10.7 -9 669.10 -52.0 -52.3 -52.2 67 0 SPO 1997 04 11 20 01 17 11.0 -9 669.20 -52.0 -52.3 -52.2 66 -99 SPO 1997 04 11 20 02 17 9.7 -9 669.10 -52.0 -52.3 -52.2 66 -99 SPO 1997 04 11 20 03 18 9.4 -9 669.10 -52.0 -52.3 -52.2 65 -99 SPO 1997 04 11 20 04 18 9.8 -9 669.20 -52.0 -52.4 -52.2 66 -99 SPO 1997 04 11 20 05 17 9.7 -9 669.20 -52.1 -52.4 -52.2 66 -99 SPO 1997 04 11 20 06 16 10.5 -9 669.20 -52.1 -52.5 -52.2 67 -99 SPO 1997 04 11 20 07 16 10.5 -9 669.20 -52.1 -52.5 -52.3 68 -99 SPO 1997 04 11 20 08 15 9.5 -9 669.20 -52.1 -52.5 -52.2 68 -99 SPO 1997 04 11 20 09 17 10.0 -9 669.20 -52.1 -52.5 -52.2 69 -99 SPO 1997 04 11 20 10 19 10.2 -9 669.20 -52.1 -52.5 -52.3 68 -99 SPO 1997 04 11 20 11 19 10.4 -9 669.20 -52.1 -52.5 -52.3 68 -99 SPO 1997 04 11 20 12 19 10.8 -9 669.20 -52.1 -52.5 -52.3 67 -99 SPO 1997 04 11 20 13 21 10.1 -9 669.20 -52.1 -52.5 -52.3 67 -99 SPO 1997 04 11 20 14 22 9.9 -9 669.10 -52.1 -52.5 -52.3 66 -99 SPO 1997 04 11 20 15 19 10.7 -9 669.20 -52.2 -52.5 -52.4 68 -99 SPO 1997 04 11 20 16 22 10.4 -9 669.20 -52.2 -52.5 -52.4 68 -99 SPO 1997 04 11 20 17 22 10.7 -9 669.10 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 18 22 10.7 -9 669.10 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 19 22 10.1 -9 669.10 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 20 21 11.0 -9 669.20 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 11 20 21 20 10.1 -9 669.20 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 20 22 18 9.8 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 23 23 9.7 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 24 22 9.9 -9 669.20 -52.3 -52.6 -52.4 67 -99 SPO 1997 04 11 20 25 21 10.7 -9 669.20 -52.3 -52.6 -52.4 67 -99 SPO 1997 04 11 20 26 23 9.8 -9 669.20 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 20 27 24 10.2 -9 669.30 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 20 28 22 10.2 -9 669.30 -52.3 -52.7 -52.5 68 -99 SPO 1997 04 11 20 29 22 9.7 -9 669.30 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 20 30 24 8.6 -9 669.30 -52.3 -52.6 -52.4 69 -99 SPO 1997 04 11 20 31 22 9.6 -9 669.30 -52.3 -52.6 -52.4 69 -99 SPO 1997 04 11 20 32 25 9.2 -9 669.30 -52.3 -52.6 -52.4 69 -99 SPO 1997 04 11 20 33 23 9.5 -9 669.30 -52.3 -52.6 -52.4 69 -99 SPO 1997 04 11 20 34 23 9.2 -9 669.30 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 35 25 9.2 -9 669.30 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 36 22 9.3 -9 669.30 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 37 23 9.1 -9 669.30 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 11 20 38 22 9.3 -9 669.30 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 11 20 39 24 10.1 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 40 21 9.8 -9 669.30 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 41 21 9.9 -9 669.30 -52.3 -52.6 -52.4 69 -99 SPO 1997 04 11 20 42 20 9.4 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 20 43 21 10.1 -9 669.20 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 20 44 20 9.1 -9 669.20 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 20 45 22 9.0 -9 669.20 -52.2 -52.6 -52.3 67 -99 SPO 1997 04 11 20 46 22 8.9 -9 669.20 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 20 47 22 10.2 -9 669.30 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 20 48 20 10.0 -9 669.30 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 20 49 22 9.8 -9 669.30 -52.2 -52.5 -52.4 68 -99 SPO 1997 04 11 20 50 22 9.5 -9 669.30 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 20 51 21 9.6 -9 669.30 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 20 52 20 10.1 -9 669.30 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 53 17 10.4 -9 669.40 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 54 21 9.2 -9 669.30 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 20 55 20 10.3 -9 669.30 -52.2 -52.5 -52.4 69 -99 SPO 1997 04 11 20 56 19 10.0 -9 669.30 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 20 57 20 9.5 -9 669.30 -52.2 -52.5 -52.3 67 -99 SPO 1997 04 11 20 58 22 10.5 -9 669.30 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 20 59 20 10.7 -9 669.20 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 21 00 21 10.3 -9 669.20 -52.2 -52.5 -52.3 68 0 SPO 1997 04 11 21 01 22 10.0 -9 669.20 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 21 02 24 10.3 -9 669.20 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 21 03 23 9.9 -9 669.20 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 21 04 21 10.2 -9 669.20 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 21 05 21 10.3 -9 669.20 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 21 06 20 10.9 -9 669.10 -52.2 -52.5 -52.3 69 -99 SPO 1997 04 11 21 07 22 10.4 -9 669.20 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 11 21 08 24 10.8 -9 669.20 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 21 09 22 10.8 -9 669.20 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 21 10 24 10.4 -9 669.20 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 21 11 24 10.3 -9 669.10 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 21 12 26 10.1 -9 669.20 -52.2 -52.5 -52.3 66 -99 SPO 1997 04 11 21 13 25 10.4 -9 669.10 -52.2 -52.5 -52.4 67 -99 SPO 1997 04 11 21 14 25 11.4 -9 669.10 -52.2 -52.6 -52.4 66 -99 SPO 1997 04 11 21 15 24 11.2 -9 669.10 -52.2 -52.6 -52.4 67 -99 SPO 1997 04 11 21 16 22 10.5 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 21 17 23 10.1 -9 669.20 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 11 21 18 24 10.1 -9 669.10 -52.2 -52.7 -52.4 67 -99 SPO 1997 04 11 21 19 24 9.9 -9 669.10 -52.3 -52.7 -52.4 67 -99 SPO 1997 04 11 21 20 26 9.8 -9 669.10 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 21 21 26 9.8 -9 669.20 -52.3 -52.7 -52.5 66 -99 SPO 1997 04 11 21 22 25 10.6 -9 669.10 -52.3 -52.7 -52.4 65 -99 SPO 1997 04 11 21 23 24 9.6 -9 669.20 -52.3 -52.7 -52.5 65 -99 SPO 1997 04 11 21 24 25 10.4 -9 669.20 -52.3 -52.7 -52.5 65 -99 SPO 1997 04 11 21 25 23 10.5 -9 669.20 -52.3 -52.7 -52.5 65 -99 SPO 1997 04 11 21 26 23 10.5 -9 669.20 -52.3 -52.7 -52.5 66 -99 SPO 1997 04 11 21 27 24 10.3 -9 669.30 -52.3 -52.7 -52.5 66 -99 SPO 1997 04 11 21 28 25 9.7 -9 669.30 -52.3 -52.7 -52.5 66 -99 SPO 1997 04 11 21 29 22 10.5 -9 669.30 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 21 30 22 9.2 -9 669.30 -52.3 -52.6 -52.4 66 -99 SPO 1997 04 11 21 31 24 9.1 -9 669.20 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 21 32 23 10.0 -9 669.20 -52.3 -52.6 -52.4 65 -99 SPO 1997 04 11 21 33 23 10.1 -9 669.20 -52.3 -52.7 -52.4 65 -99 SPO 1997 04 11 21 34 23 10.7 -9 669.20 -52.3 -52.7 -52.4 66 -99 SPO 1997 04 11 21 35 23 10.3 -9 669.30 -52.3 -52.7 -52.5 66 -99 SPO 1997 04 11 21 36 22 9.7 -9 669.30 -52.3 -52.7 -52.4 66 -99 SPO 1997 04 11 21 37 23 9.4 -9 669.30 -52.3 -52.7 -52.4 67 -99 SPO 1997 04 11 21 38 25 11.0 -9 669.30 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 21 39 23 10.7 -9 669.20 -52.3 -52.7 -52.5 68 -99 SPO 1997 04 11 21 40 23 10.8 -9 669.20 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 21 41 23 10.6 -9 669.20 -52.3 -52.7 -52.4 68 -99 SPO 1997 04 11 21 42 24 11.1 -9 669.20 -52.3 -52.7 -52.4 67 -99 SPO 1997 04 11 21 43 25 11.6 -9 669.20 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 21 44 24 11.8 -9 669.20 -52.3 -52.7 -52.5 67 -99 SPO 1997 04 11 21 45 25 11.1 -9 669.20 -52.3 -52.7 -52.6 66 -99 SPO 1997 04 11 21 46 25 11.7 -9 669.10 -52.4 -52.7 -52.6 66 -99 SPO 1997 04 11 21 47 24 10.6 -9 669.10 -52.4 -52.7 -52.6 66 -99 SPO 1997 04 11 21 48 24 11.7 -9 669.10 -52.4 -52.8 -52.6 66 -99 SPO 1997 04 11 21 49 25 11.3 -9 669.10 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 21 50 22 11.1 -9 669.10 -52.5 -52.9 -52.7 66 -99 SPO 1997 04 11 21 51 24 10.0 -9 669.20 -52.5 -53.0 -52.7 66 -99 SPO 1997 04 11 21 52 24 10.6 -9 669.10 -52.6 -53.0 -52.7 67 -99 SPO 1997 04 11 21 53 24 11.4 -9 669.10 -52.6 -53.0 -52.8 66 -99 SPO 1997 04 11 21 54 23 11.0 -9 669.10 -52.6 -53.0 -52.8 66 -99 SPO 1997 04 11 21 55 26 10.0 -9 669.10 -52.6 -53.0 -52.8 66 -99 SPO 1997 04 11 21 56 24 11.3 -9 669.10 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 21 57 26 10.2 -9 669.10 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 21 58 25 11.0 -9 669.10 -52.7 -53.1 -52.8 66 -99 SPO 1997 04 11 21 59 25 10.4 -9 669.10 -52.7 -53.1 -52.9 66 -99 SPO 1997 04 11 22 00 25 11.4 -9 669.00 -52.7 -53.1 -52.9 66 0 SPO 1997 04 11 22 01 24 11.6 -9 669.10 -52.7 -53.0 -52.9 67 -99 SPO 1997 04 11 22 02 25 11.7 -9 669.00 -52.7 -53.0 -52.9 67 -99 SPO 1997 04 11 22 03 25 10.8 -9 669.00 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 22 04 25 11.2 -9 669.00 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 22 05 24 11.3 -9 669.00 -52.7 -53.0 -52.8 66 -99 SPO 1997 04 11 22 06 24 10.9 -9 669.00 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 07 24 10.2 -9 669.00 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 08 24 10.7 -9 669.00 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 09 25 11.0 -9 669.00 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 10 25 10.7 -9 669.10 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 11 24 10.3 -9 669.10 -52.6 -53.0 -52.8 65 -99 SPO 1997 04 11 22 12 25 10.5 -9 669.00 -52.6 -53.0 -52.8 66 -99 SPO 1997 04 11 22 13 24 9.8 -9 669.00 -52.6 -53.0 -52.7 67 -99 SPO 1997 04 11 22 14 23 11.1 -9 669.00 -52.6 -53.0 -52.7 67 -99 SPO 1997 04 11 22 15 23 11.5 -9 669.00 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 22 16 23 10.9 -9 669.00 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 22 17 23 11.7 -9 669.00 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 22 18 24 11.1 -9 669.00 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 22 19 23 11.3 -9 669.00 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 22 20 24 9.8 -9 669.00 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 22 21 23 10.4 -9 669.00 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 11 22 22 26 10.9 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 11 22 23 23 9.2 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 22 24 22 10.9 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 22 25 23 10.2 -9 669.00 -52.5 -52.9 -52.6 67 -99 SPO 1997 04 11 22 26 23 10.1 -9 669.00 -52.5 -52.9 -52.6 68 -99 SPO 1997 04 11 22 27 22 10.1 -9 669.00 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 28 22 10.2 -9 669.00 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 29 21 9.9 -9 669.10 -52.5 -52.9 -52.6 68 -99 SPO 1997 04 11 22 30 21 9.6 -9 669.10 -52.5 -52.9 -52.6 67 -99 SPO 1997 04 11 22 31 20 11.3 -9 669.10 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 32 20 9.8 -9 669.10 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 22 33 18 9.5 -9 669.10 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 22 34 20 9.6 -9 669.10 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 11 22 35 20 10.0 -9 669.00 -52.5 -52.8 -52.6 69 -99 SPO 1997 04 11 22 36 20 9.5 -9 669.10 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 22 37 21 9.9 -9 669.00 -52.5 -52.8 -52.6 69 -99 SPO 1997 04 11 22 38 20 10.3 -9 669.00 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 22 39 22 8.7 -9 669.10 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 11 22 40 21 10.4 -9 669.10 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 11 22 41 22 8.9 -9 669.10 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 22 42 22 8.5 -9 669.10 -52.5 -52.9 -52.6 66 -99 SPO 1997 04 11 22 43 23 9.5 -9 669.10 -52.5 -52.9 -52.7 66 -99 SPO 1997 04 11 22 44 22 9.7 -9 669.10 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 45 21 9.3 -9 669.10 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 46 22 9.6 -9 669.10 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 47 19 10.0 -9 669.10 -52.6 -52.9 -52.7 69 -99 SPO 1997 04 11 22 48 20 9.0 -9 669.10 -52.6 -52.9 -52.7 69 -99 SPO 1997 04 11 22 49 18 9.7 -9 669.10 -52.5 -52.9 -52.7 69 -99 SPO 1997 04 11 22 50 21 9.1 -9 669.10 -52.5 -52.9 -52.7 68 -99 SPO 1997 04 11 22 51 18 9.8 -9 669.10 -52.5 -52.9 -52.7 67 -99 SPO 1997 04 11 22 52 20 8.9 -9 669.10 -52.5 -52.9 -52.7 67 -99 SPO 1997 04 11 22 53 21 10.3 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 22 54 20 10.6 -9 669.00 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 22 55 23 9.6 -9 669.00 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 22 56 23 11.0 -9 669.00 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 22 57 22 10.6 -9 669.00 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 11 22 58 20 9.7 -9 669.00 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 22 59 20 11.2 -9 669.00 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 11 23 00 21 10.4 -9 669.00 -52.5 -52.8 -52.6 69 0 SPO 1997 04 11 23 01 21 11.1 -9 668.90 -52.5 -52.8 -52.6 69 -99 SPO 1997 04 11 23 02 21 11.4 -9 668.90 -52.5 -52.8 -52.6 69 -99 SPO 1997 04 11 23 03 22 10.9 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 11 23 04 22 11.4 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 11 23 05 21 11.5 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 06 21 10.5 -9 668.80 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 07 21 10.2 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 08 22 10.7 -9 669.00 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 09 22 10.9 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 10 22 10.2 -9 669.00 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 11 23 11 23 10.8 -9 669.00 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 23 12 23 9.9 -9 669.00 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 23 13 23 9.8 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 11 23 14 23 10.2 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 11 23 15 23 10.5 -9 669.00 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 11 23 16 23 9.7 -9 669.00 -52.6 -52.9 -52.7 65 -99 SPO 1997 04 11 23 17 21 10.4 -9 669.00 -52.6 -52.9 -52.7 66 -99 SPO 1997 04 11 23 18 23 9.5 -9 669.00 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 23 19 25 9.4 -9 669.00 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 23 20 24 9.9 -9 669.00 -52.6 -52.9 -52.7 67 -99 SPO 1997 04 11 23 21 24 10.2 -9 669.00 -52.6 -52.9 -52.7 68 -99 SPO 1997 04 11 23 22 25 9.7 -9 669.00 -52.6 -52.9 -52.8 68 -99 SPO 1997 04 11 23 23 24 9.8 -9 669.00 -52.6 -52.9 -52.7 68 -99 SPO 1997 04 11 23 24 25 9.4 -9 669.00 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 11 23 25 24 9.9 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 11 23 26 24 10.1 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 11 23 27 23 10.0 -9 669.00 -52.6 -52.8 -52.6 66 -99 SPO 1997 04 11 23 28 25 9.6 -9 669.00 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 23 29 25 9.2 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 30 24 10.3 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 31 23 10.4 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 32 23 10.0 -9 669.00 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 23 33 23 10.1 -9 669.00 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 11 23 34 24 9.8 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 35 25 9.4 -9 669.00 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 36 23 10.2 -9 669.10 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 11 23 37 23 10.1 -9 669.00 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 23 38 25 9.5 -9 669.00 -52.5 -52.8 -52.6 65 -99 SPO 1997 04 11 23 39 24 10.7 -9 669.00 -52.5 -52.7 -52.5 65 -99 SPO 1997 04 11 23 40 23 11.3 -9 669.00 -52.4 -52.7 -52.5 65 -99 SPO 1997 04 11 23 41 24 10.8 -9 669.00 -52.4 -52.7 -52.5 65 -99 SPO 1997 04 11 23 42 24 10.8 -9 668.90 -52.4 -52.7 -52.5 65 -99 SPO 1997 04 11 23 43 23 11.3 -9 668.90 -52.4 -52.7 -52.6 65 -99 SPO 1997 04 11 23 44 23 10.3 -9 668.90 -52.4 -52.7 -52.5 66 -99 SPO 1997 04 11 23 45 24 11.1 -9 668.90 -52.4 -52.7 -52.5 66 -99 SPO 1997 04 11 23 46 25 11.6 -9 668.80 -52.4 -52.7 -52.5 66 -99 SPO 1997 04 11 23 47 24 11.5 -9 668.80 -52.4 -52.6 -52.5 66 -99 SPO 1997 04 11 23 48 25 11.8 -9 668.80 -52.4 -52.6 -52.5 66 -99 SPO 1997 04 11 23 49 24 11.6 -9 668.80 -52.4 -52.6 -52.5 65 -99 SPO 1997 04 11 23 50 22 11.4 -9 668.80 -52.4 -52.6 -52.6 65 -99 SPO 1997 04 11 23 51 22 11.2 -9 668.80 -52.4 -52.7 -52.6 65 -99 SPO 1997 04 11 23 52 22 10.6 -9 668.90 -52.4 -52.7 -52.6 65 -99 SPO 1997 04 11 23 53 21 10.9 -9 668.90 -52.4 -52.7 -52.5 66 -99 SPO 1997 04 11 23 54 21 11.4 -9 668.80 -52.4 -52.7 -52.6 67 -99 SPO 1997 04 11 23 55 21 11.8 -9 668.90 -52.4 -52.7 -52.6 68 -99 SPO 1997 04 11 23 56 20 11.3 -9 668.90 -52.4 -52.7 -52.5 68 -99 SPO 1997 04 11 23 57 20 10.9 -9 668.90 -52.4 -52.7 -52.6 69 -99 SPO 1997 04 11 23 58 21 10.1 -9 668.90 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 11 23 59 21 10.6 -9 668.90 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 00 21 11.2 -9 669.00 -52.4 -52.7 -52.6 -99 0 SPO 1997 04 12 00 01 20 10.7 -9 669.00 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 02 19 10.8 -9 669.00 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 03 20 9.8 -9 669.00 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 04 20 10.5 -9 669.00 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 05 19 10.7 -9 669.00 -52.4 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 06 18 10.9 -9 669.00 -52.5 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 07 20 10.4 -9 669.00 -52.5 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 08 18 10.4 -9 669.00 -52.5 -52.7 -52.6 -99 -99 SPO 1997 04 12 00 09 18 10.3 -9 669.00 -52.5 -52.8 -52.6 -99 -99 SPO 1997 04 12 00 10 17 10.8 -9 669.00 -52.5 -52.8 -52.6 -99 -99 SPO 1997 04 12 00 11 19 10.0 -9 669.00 -52.5 -52.8 -52.6 -99 -99 SPO 1997 04 12 00 12 19 10.4 -9 668.90 -52.5 -52.8 -52.7 -99 -99 SPO 1997 04 12 00 13 20 10.4 -9 668.90 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 12 00 14 20 10.5 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 12 00 15 20 10.4 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 12 00 16 20 10.8 -9 668.90 -52.5 -52.8 -52.6 67 -99 SPO 1997 04 12 00 17 22 10.6 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 12 00 18 22 10.8 -9 668.90 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 12 00 19 21 10.7 -9 668.90 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 12 00 20 22 10.4 -9 668.90 -52.5 -52.7 -52.6 68 -99 SPO 1997 04 12 00 21 23 10.0 -9 668.90 -52.5 -52.7 -52.6 69 -99 SPO 1997 04 12 00 22 24 10.2 -9 668.90 -52.5 -52.7 -52.6 68 -99 SPO 1997 04 12 00 23 24 10.7 -9 668.90 -52.5 -52.7 -52.6 68 -99 SPO 1997 04 12 00 24 23 10.7 -9 668.90 -52.5 -52.7 -52.6 68 -99 SPO 1997 04 12 00 25 25 10.0 -9 668.90 -52.5 -52.7 -52.6 67 -99 SPO 1997 04 12 00 26 25 9.9 -9 668.80 -52.5 -52.7 -52.6 67 -99 SPO 1997 04 12 00 27 24 10.7 -9 668.80 -52.5 -52.8 -52.6 68 -99 SPO 1997 04 12 00 28 24 10.2 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 12 00 29 24 10.1 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 12 00 30 24 10.0 -9 668.90 -52.5 -52.8 -52.7 68 -99 SPO 1997 04 12 00 31 23 10.7 -9 668.90 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 12 00 32 23 9.9 -9 668.90 -52.6 -52.8 -52.7 68 -99 SPO 1997 04 12 00 33 22 9.5 -9 668.90 -52.5 -52.8 -52.6 66 -99 SPO 1997 04 12 00 34 22 9.3 -9 668.90 -52.5 -52.7 -52.6 65 -99 SPO 1997 04 12 00 35 21 9.8 -9 669.00 -52.5 -52.7 -52.6 65 -99 SPO 1997 04 12 00 36 21 9.2 -9 669.00 -52.5 -52.7 -52.6 65 -99 SPO 1997 04 12 00 37 21 9.5 -9 669.00 -52.5 -52.7 -52.6 65 -99 SPO 1997 04 12 00 38 21 9.5 -9 669.00 -52.5 -52.7 -52.6 66 -99 SPO 1997 04 12 00 39 21 9.7 -9 669.00 -52.5 -52.7 -52.7 67 -99 SPO 1997 04 12 00 40 22 9.7 -9 669.00 -52.5 -52.7 -52.6 68 -99 SPO 1997 04 12 00 41 21 9.4 -9 669.00 -52.5 -52.7 -52.7 68 -99 SPO 1997 04 12 00 42 22 9.4 -9 669.00 -52.5 -52.7 -52.7 68 -99 SPO 1997 04 12 00 43 22 9.1 -9 669.00 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 12 00 44 21 9.8 -9 668.90 -52.5 -52.8 -52.7 67 -99 SPO 1997 04 12 00 45 22 9.6 -9 668.90 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 12 00 46 22 10.2 -9 668.90 -52.5 -52.8 -52.7 66 -99 SPO 1997 04 12 00 47 21 10.5 -9 668.90 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 12 00 48 22 9.6 -9 668.90 -52.6 -52.8 -52.7 65 -99 SPO 1997 04 12 00 49 22 9.8 -9 668.90 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 12 00 50 21 9.6 -9 668.90 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 51 22 9.4 -9 668.90 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 52 20 10.4 -9 668.90 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 53 20 10.0 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 54 22 9.4 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 55 20 9.3 -9 669.00 -52.6 -52.8 -52.7 67 -99 SPO 1997 04 12 00 56 22 9.5 -9 669.00 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 12 00 57 21 10.0 -9 669.00 -52.6 -52.8 -52.7 66 -99 SPO 1997 04 12 00 58 22 9.5 -9 669.00 -52.6 -52.8 -52.7 65 -99 SPO 1997 04 12 00 59 23 9.7 -9 669.00 -52.6 -52.8 -52.7 65 -99 SPO 1997 04 12 01 00 22 9.8 -9 669.00 -52.6 -52.8 -52.8 65 0 SPO 1997 04 12 01 01 22 9.7 -9 669.00 -52.6 -52.8 -52.8 65 -99 SPO 1997 04 12 01 02 22 10.1 -9 669.00 -52.6 -52.9 -52.8 65 -99 SPO 1997 04 12 01 03 22 9.8 -9 669.00 -52.6 -52.9 -52.8 66 -99 SPO 1997 04 12 01 04 23 9.8 -9 669.00 -52.6 -52.9 -52.8 66 -99 SPO 1997 04 12 01 05 23 9.6 -9 669.00 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 12 01 06 24 9.0 -9 669.00 -52.7 -53.0 -52.8 67 -99 SPO 1997 04 12 01 07 24 8.9 -9 669.00 -52.7 -53.0 -52.9 66 -99 SPO 1997 04 12 01 08 23 9.5 -9 669.00 -52.7 -53.0 -52.8 65 -99 SPO 1997 04 12 01 09 24 8.9 -9 669.00 -52.7 -53.0 -52.8 65 -99 SPO 1997 04 12 01 10 23 8.7 -9 669.00 -52.7 -52.9 -52.8 64 -99 SPO 1997 04 12 01 11 25 9.1 -9 669.00 -52.7 -52.9 -52.8 64 -99 SPO 1997 04 12 01 12 23 9.4 -9 669.00 -52.7 -52.9 -52.8 64 -99 SPO 1997 04 12 01 13 22 9.3 -9 669.00 -52.7 -52.9 -52.9 65 -99 SPO 1997 04 12 01 14 22 9.1 -9 669.00 -52.7 -52.9 -52.9 65 -99 SPO 1997 04 12 01 15 22 9.5 -9 669.00 -52.8 -52.9 -52.9 65 -99 SPO 1997 04 12 01 16 24 9.5 -9 669.00 -52.8 -52.9 -52.9 65 -99 SPO 1997 04 12 01 17 24 9.6 -9 668.90 -52.8 -53.0 -52.9 65 -99 SPO 1997 04 12 01 18 24 9.7 -9 669.00 -52.8 -53.0 -52.9 65 -99 SPO 1997 04 12 01 19 24 9.9 -9 669.00 -52.8 -53.0 -52.9 65 -99 SPO 1997 04 12 01 20 25 9.3 -9 669.00 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 21 25 9.3 -9 669.00 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 22 25 8.5 -9 669.00 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 23 25 8.0 -9 669.10 -52.8 -53.1 -53.0 64 -99 SPO 1997 04 12 01 24 25 8.3 -9 669.00 -52.8 -53.1 -53.0 65 -99 SPO 1997 04 12 01 25 25 8.7 -9 669.00 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 26 24 9.5 -9 669.00 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 27 26 8.9 -9 669.10 -52.8 -53.1 -52.9 65 -99 SPO 1997 04 12 01 28 26 8.5 -9 669.10 -52.8 -53.1 -53.0 65 -99 SPO 1997 04 12 01 29 28 8.3 -9 669.10 -52.8 -53.1 -53.0 65 -99 SPO 1997 04 12 01 30 30 8.1 -9 669.10 -52.8 -53.1 -53.0 65 -99 SPO 1997 04 12 01 31 32 8.7 -9 669.10 -52.8 -53.1 -53.0 65 -99 SPO 1997 04 12 01 32 32 8.9 -9 669.10 -52.9 -53.1 -53.0 65 -99 SPO 1997 04 12 01 33 30 8.6 -9 669.10 -52.9 -53.2 -53.0 65 -99 SPO 1997 04 12 01 34 31 8.4 -9 669.10 -52.9 -53.2 -53.1 65 -99 SPO 1997 04 12 01 35 30 8.0 -9 669.10 -52.9 -53.2 -53.1 65 -99 SPO 1997 04 12 01 36 29 8.4 -9 669.10 -52.9 -53.2 -53.1 65 -99 SPO 1997 04 12 01 37 30 8.6 -9 669.20 -53.0 -53.3 -53.1 66 -99 SPO 1997 04 12 01 38 31 8.5 -9 669.10 -53.0 -53.3 -53.1 66 -99 SPO 1997 04 12 01 39 33 8.2 -9 669.10 -53.0 -53.3 -53.1 66 -99 SPO 1997 04 12 01 40 35 8.5 -9 669.10 -53.0 -53.3 -53.2 66 -99 SPO 1997 04 12 01 41 34 8.7 -9 669.10 -53.0 -53.3 -53.2 66 -99 SPO 1997 04 12 01 42 34 8.3 -9 669.10 -53.1 -53.4 -53.2 66 -99 SPO 1997 04 12 01 43 32 8.1 -9 669.10 -53.1 -53.4 -53.2 65 -99 SPO 1997 04 12 01 44 31 8.9 -9 669.10 -53.1 -53.4 -53.2 65 -99 SPO 1997 04 12 01 45 29 9.2 -9 669.10 -53.1 -53.3 -53.2 64 -99 SPO 1997 04 12 01 46 29 8.7 -9 669.10 -53.1 -53.4 -53.2 64 -99 SPO 1997 04 12 01 47 28 9.0 -9 669.10 -53.1 -53.3 -53.2 64 -99 SPO 1997 04 12 01 48 30 9.0 -9 669.10 -53.1 -53.4 -53.3 64 -99 SPO 1997 04 12 01 49 31 8.5 -9 669.10 -53.1 -53.4 -53.3 65 -99 SPO 1997 04 12 01 50 30 9.6 -9 669.10 -53.2 -53.4 -53.3 66 -99 SPO 1997 04 12 01 51 31 9.4 -9 669.00 -53.2 -53.4 -53.4 66 -99 SPO 1997 04 12 01 52 32 9.4 -9 669.00 -53.2 -53.4 -53.4 65 -99 SPO 1997 04 12 01 53 32 9.7 -9 669.00 -53.2 -53.5 -53.4 64 -99 SPO 1997 04 12 01 54 30 10.1 -9 669.00 -53.2 -53.5 -53.4 64 -99 SPO 1997 04 12 01 55 30 9.2 -9 668.90 -53.3 -53.6 -53.4 65 -99 SPO 1997 04 12 01 56 28 10.6 -9 668.90 -53.3 -53.6 -53.4 64 -99 SPO 1997 04 12 01 57 27 10.0 -9 668.90 -53.3 -53.6 -53.4 64 -99 SPO 1997 04 12 01 58 25 10.2 -9 668.90 -53.3 -53.6 -53.4 64 -99 SPO 1997 04 12 01 59 26 9.4 -9 668.90 -53.3 -53.5 -53.4 65 -99 SPO 1997 04 12 02 00 24 9.9 -9 668.80 -53.3 -53.5 -53.4 65 0 SPO 1997 04 12 02 01 25 10.0 -9 668.80 -53.3 -53.5 -53.4 66 -99 SPO 1997 04 12 02 02 25 10.1 -9 668.80 -53.3 -53.5 -53.4 66 -99 SPO 1997 04 12 02 03 27 9.8 -9 668.80 -53.3 -53.6 -53.5 66 -99 SPO 1997 04 12 02 04 26 10.6 -9 668.80 -53.3 -53.6 -53.5 65 -99 SPO 1997 04 12 02 05 25 10.2 -9 668.70 -53.3 -53.6 -53.5 64 -99 SPO 1997 04 12 02 06 25 10.2 -9 668.80 -53.4 -53.6 -53.5 65 -99 SPO 1997 04 12 02 07 24 10.2 -9 668.80 -53.4 -53.6 -53.5 65 -99 SPO 1997 04 12 02 08 24 11.1 -9 668.70 -53.4 -53.6 -53.5 64 -99 SPO 1997 04 12 02 09 24 11.0 -9 668.70 -53.4 -53.5 -53.5 64 -99 SPO 1997 04 12 02 10 23 10.8 -9 668.70 -53.3 -53.6 -53.5 64 -99 SPO 1997 04 12 02 11 23 11.8 -9 668.70 -53.4 -53.6 -53.4 65 -99 SPO 1997 04 12 02 12 22 10.6 -9 668.70 -53.4 -53.6 -53.4 65 -99 SPO 1997 04 12 02 13 23 11.8 -9 668.70 -53.3 -53.6 -53.5 65 -99 SPO 1997 04 12 02 14 23 11.0 -9 668.70 -53.3 -53.6 -53.5 65 -99 SPO 1997 04 12 02 15 23 11.4 -9 668.70 -53.3 -53.6 -53.5 65 -99 SPO 1997 04 12 02 16 22 10.5 -9 668.70 -53.4 -53.7 -53.5 66 -99 SPO 1997 04 12 02 17 22 11.2 -9 668.70 -53.4 -53.7 -53.5 65 -99 SPO 1997 04 12 02 18 23 11.3 -9 668.70 -53.4 -53.7 -53.5 65 -99 SPO 1997 04 12 02 19 25 10.6 -9 668.70 -53.4 -53.7 -53.5 65 -99 SPO 1997 04 12 02 20 25 10.8 -9 668.70 -53.4 -53.7 -53.6 65 -99 SPO 1997 04 12 02 21 26 10.9 -9 668.60 -53.4 -53.7 -53.6 65 -99 SPO 1997 04 12 02 22 26 10.9 -9 668.60 -53.4 -53.7 -53.6 67 -99 SPO 1997 04 12 02 23 27 11.6 -9 668.60 -53.4 -53.7 -53.6 66 -99 SPO 1997 04 12 02 24 26 11.1 -9 668.60 -53.4 -53.7 -53.6 66 -99 SPO 1997 04 12 02 25 25 11.4 -9 668.60 -53.4 -53.7 -53.6 65 -99 SPO 1997 04 12 02 26 26 11.9 -9 668.60 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 12 02 27 25 11.4 -9 668.60 -53.4 -53.7 -53.6 64 -99 SPO 1997 04 12 02 28 24 11.2 -9 668.60 -53.5 -53.7 -53.6 65 -99 SPO 1997 04 12 02 29 27 11.2 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 30 27 11.6 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 31 27 10.1 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 32 26 10.2 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 33 27 10.5 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 34 26 10.3 -9 668.60 -53.5 -53.8 -53.6 64 -99 SPO 1997 04 12 02 35 27 10.0 -9 668.60 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 12 02 36 27 10.9 -9 668.60 -53.5 -53.8 -53.6 65 -99 SPO 1997 04 12 02 37 27 10.5 -9 668.60 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 12 02 38 27 10.8 -9 668.60 -53.5 -53.8 -53.7 65 -99 SPO 1997 04 12 02 39 27 10.4 -9 668.60 -53.5 -53.8 -53.7 64 -99 SPO 1997 04 12 02 40 30 10.0 -9 668.60 -53.6 -53.8 -53.7 65 -99 SPO 1997 04 12 02 41 28 11.2 -9 668.60 -53.6 -53.9 -53.8 64 -99 SPO 1997 04 12 02 42 28 10.7 -9 668.60 -53.6 -53.9 -53.8 64 -99 SPO 1997 04 12 02 43 28 10.3 -9 668.60 -53.6 -53.9 -53.8 64 -99 SPO 1997 04 12 02 44 27 10.8 -9 668.60 -53.6 -53.9 -53.8 64 -99 SPO 1997 04 12 02 45 28 10.3 -9 668.60 -53.7 -54.0 -53.8 64 -99 SPO 1997 04 12 02 46 28 10.8 -9 668.60 -53.7 -54.0 -53.8 65 -99 SPO 1997 04 12 02 47 28 10.3 -9 668.60 -53.7 -54.0 -53.9 65 -99 SPO 1997 04 12 02 48 30 10.7 -9 668.60 -53.7 -54.0 -53.9 65 -99 SPO 1997 04 12 02 49 28 10.6 -9 668.60 -53.7 -54.1 -53.9 65 -99 SPO 1997 04 12 02 50 29 10.3 -9 668.60 -53.8 -54.1 -54.0 65 -99 SPO 1997 04 12 02 51 30 10.4 -9 668.60 -53.8 -54.1 -54.0 65 -99 SPO 1997 04 12 02 52 30 10.2 -9 668.60 -53.8 -54.1 -54.0 64 -99 SPO 1997 04 12 02 53 30 10.3 -9 668.60 -53.8 -54.1 -54.0 64 -99 SPO 1997 04 12 02 54 30 10.4 -9 668.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 12 02 55 31 9.8 -9 668.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 12 02 56 31 10.4 -9 668.60 -53.9 -54.1 -54.1 65 -99 SPO 1997 04 12 02 57 31 9.7 -9 668.60 -53.9 -54.2 -54.1 65 -99 SPO 1997 04 12 02 58 30 9.9 -9 668.60 -53.9 -54.2 -54.1 65 -99 SPO 1997 04 12 02 59 31 10.2 -9 668.60 -53.9 -54.2 -54.1 65 -99 SPO 1997 04 12 03 00 30 9.8 -9 668.60 -54.0 -54.2 -54.1 65 0 SPO 1997 04 12 03 01 30 9.6 -9 668.70 -54.0 -54.2 -54.1 64 -99 SPO 1997 04 12 03 02 31 9.9 -9 668.60 -54.0 -54.2 -54.1 64 -99 SPO 1997 04 12 03 03 30 9.9 -9 668.60 -54.0 -54.3 -54.1 63 -99 SPO 1997 04 12 03 04 30 9.5 -9 668.70 -54.0 -54.3 -54.2 63 -99 SPO 1997 04 12 03 05 29 9.5 -9 668.70 -54.0 -54.3 -54.2 63 -99 SPO 1997 04 12 03 06 30 9.3 -9 668.70 -54.0 -54.4 -54.2 63 -99 SPO 1997 04 12 03 07 29 9.1 -9 668.70 -54.1 -54.4 -54.2 64 -99 SPO 1997 04 12 03 08 28 9.7 -9 668.70 -54.1 -54.4 -54.2 64 -99 SPO 1997 04 12 03 09 28 9.9 -9 668.60 -54.1 -54.4 -54.3 64 -99 SPO 1997 04 12 03 10 29 10.4 -9 668.60 -54.1 -54.4 -54.3 64 -99 SPO 1997 04 12 03 11 30 9.9 -9 668.60 -54.2 -54.4 -54.3 65 -99 SPO 1997 04 12 03 12 31 9.8 -9 668.60 -54.2 -54.4 -54.3 65 -99 SPO 1997 04 12 03 13 30 10.2 -9 668.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 12 03 14 30 9.9 -9 668.60 -54.2 -54.4 -54.4 63 -99 SPO 1997 04 12 03 15 31 9.6 -9 668.60 -54.2 -54.4 -54.4 63 -99 SPO 1997 04 12 03 16 30 9.7 -9 668.60 -54.2 -54.4 -54.4 62 -99 SPO 1997 04 12 03 17 31 9.6 -9 668.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 12 03 18 30 10.3 -9 668.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 12 03 19 29 9.7 -9 668.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 12 03 20 29 9.7 -9 668.60 -54.3 -54.6 -54.5 63 -99 SPO 1997 04 12 03 21 28 9.2 -9 668.60 -54.3 -54.6 -54.5 63 -99 SPO 1997 04 12 03 22 28 8.8 -9 668.60 -54.3 -54.6 -54.5 63 -99 SPO 1997 04 12 03 23 28 9.9 -9 668.60 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 24 28 9.3 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 25 27 8.4 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 26 29 9.4 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 27 28 8.6 -9 668.70 -54.4 -54.6 -54.5 62 -99 SPO 1997 04 12 03 28 30 8.7 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 29 30 9.4 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 30 31 9.1 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 31 30 9.0 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 32 31 9.3 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 33 30 8.8 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 34 28 8.9 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 35 28 9.5 -9 668.70 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 12 03 36 29 8.5 -9 668.70 -54.4 -54.6 -54.5 62 -99 SPO 1997 04 12 03 37 28 9.2 -9 668.70 -54.4 -54.7 -54.5 62 -99 SPO 1997 04 12 03 38 29 9.3 -9 668.70 -54.4 -54.7 -54.5 62 -99 SPO 1997 04 12 03 39 29 9.2 -9 668.80 -54.4 -54.7 -54.5 62 -99 SPO 1997 04 12 03 40 29 8.8 -9 668.80 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 41 28 8.7 -9 668.80 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 42 29 8.8 -9 668.80 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 43 28 8.4 -9 668.80 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 44 28 8.3 -9 668.90 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 45 28 8.7 -9 668.90 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 12 03 46 26 8.8 -9 668.90 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 12 03 47 25 9.1 -9 668.90 -54.4 -54.7 -54.6 62 -99 SPO 1997 04 12 03 48 25 8.4 -9 668.90 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 12 03 49 24 8.2 -9 668.90 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 12 03 50 24 8.7 -9 668.90 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 12 03 51 25 8.2 -9 668.90 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 12 03 52 24 9.1 -9 668.90 -54.5 -54.7 -54.7 62 -99 SPO 1997 04 12 03 53 25 8.8 -9 669.00 -54.5 -54.8 -54.7 63 -99 SPO 1997 04 12 03 54 24 7.5 -9 669.00 -54.5 -54.8 -54.7 63 -99 SPO 1997 04 12 03 55 26 8.0 -9 669.00 -54.6 -54.9 -54.7 64 -99 SPO 1997 04 12 03 56 24 8.2 -9 669.00 -54.6 -54.9 -54.8 64 -99 SPO 1997 04 12 03 57 26 8.2 -9 669.00 -54.6 -54.9 -54.8 64 -99 SPO 1997 04 12 03 58 27 8.2 -9 669.00 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 12 03 59 28 8.1 -9 668.90 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 12 04 00 28 8.5 -9 668.90 -54.7 -54.9 -54.8 63 0 SPO 1997 04 12 04 01 29 8.4 -9 668.90 -54.7 -54.9 -54.8 63 -99 SPO 1997 04 12 04 02 27 9.2 -9 668.90 -54.7 -55.0 -54.9 63 -99 SPO 1997 04 12 04 03 26 9.4 -9 668.90 -54.8 -55.0 -55.0 64 -99 SPO 1997 04 12 04 04 25 9.8 -9 668.90 -54.8 -55.0 -55.0 65 -99 SPO 1997 04 12 04 05 25 8.9 -9 668.90 -54.8 -55.1 -55.0 65 -99 SPO 1997 04 12 04 06 24 8.1 -9 669.00 -54.9 -55.1 -55.1 65 -99 SPO 1997 04 12 04 07 23 8.8 -9 669.00 -54.9 -55.1 -55.1 64 -99 SPO 1997 04 12 04 08 23 7.6 -9 669.00 -54.9 -55.2 -55.1 63 -99 SPO 1997 04 12 04 09 24 7.5 -9 669.10 -55.0 -55.2 -55.2 64 -99 SPO 1997 04 12 04 10 23 7.5 -9 669.10 -55.0 -55.3 -55.2 63 -99 SPO 1997 04 12 04 11 22 7.6 -9 669.10 -55.0 -55.3 -55.2 63 -99 SPO 1997 04 12 04 12 26 7.5 -9 669.10 -55.1 -55.3 -55.2 63 -99 SPO 1997 04 12 04 13 27 7.8 -9 669.10 -55.1 -55.4 -55.3 63 -99 SPO 1997 04 12 04 14 27 8.2 -9 669.00 -55.2 -55.4 -55.3 64 -99 SPO 1997 04 12 04 15 28 8.6 -9 669.00 -55.2 -55.4 -55.3 64 -99 SPO 1997 04 12 04 16 27 8.1 -9 669.00 -55.2 -55.4 -55.4 64 -99 SPO 1997 04 12 04 17 25 7.3 -9 669.10 -55.2 -55.4 -55.4 64 -99 SPO 1997 04 12 04 18 25 8.0 -9 669.10 -55.2 -55.4 -55.4 64 -99 SPO 1997 04 12 04 19 25 7.9 -9 669.10 -55.3 -55.4 -55.4 65 -99 SPO 1997 04 12 04 20 26 7.5 -9 669.00 -55.3 -55.4 -55.4 64 -99 SPO 1997 04 12 04 21 26 7.8 -9 669.00 -55.3 -55.4 -55.4 63 -99 SPO 1997 04 12 04 22 28 8.0 -9 669.00 -55.3 -55.4 -55.4 62 -99 SPO 1997 04 12 04 23 26 8.2 -9 669.00 -55.3 -55.4 -55.4 62 -99 SPO 1997 04 12 04 24 24 7.9 -9 669.00 -55.3 -55.4 -55.4 62 -99 SPO 1997 04 12 04 25 24 8.2 -9 669.00 -55.3 -55.4 -55.5 62 -99 SPO 1997 04 12 04 26 23 8.2 -9 669.00 -55.4 -55.5 -55.5 63 -99 SPO 1997 04 12 04 27 22 7.7 -9 669.00 -55.4 -55.6 -55.5 63 -99 SPO 1997 04 12 04 28 23 7.9 -9 669.00 -55.4 -55.6 -55.6 63 -99 SPO 1997 04 12 04 29 24 8.8 -9 669.00 -55.4 -55.6 -55.6 63 -99 SPO 1997 04 12 04 30 25 8.8 -9 668.90 -55.4 -55.6 -55.6 64 -99 SPO 1997 04 12 04 31 25 8.8 -9 668.80 -55.5 -55.6 -55.6 64 -99 SPO 1997 04 12 04 32 24 9.3 -9 668.80 -55.5 -55.6 -55.6 63 -99 SPO 1997 04 12 04 33 23 8.9 -9 668.90 -55.5 -55.6 -55.6 63 -99 SPO 1997 04 12 04 34 24 8.4 -9 668.90 -55.5 -55.6 -55.6 63 -99 SPO 1997 04 12 04 35 23 8.4 -9 668.90 -55.6 -55.6 -55.7 64 -99 SPO 1997 04 12 04 36 23 8.0 -9 668.90 -55.6 -55.6 -55.7 63 -99 SPO 1997 04 12 04 37 24 8.7 -9 668.90 -55.5 -55.6 -55.7 63 -99 SPO 1997 04 12 04 38 25 8.9 -9 668.90 -55.5 -55.6 -55.7 63 -99 SPO 1997 04 12 04 39 26 9.1 -9 668.90 -55.6 -55.6 -55.7 64 -99 SPO 1997 04 12 04 40 26 8.4 -9 668.80 -55.6 -55.6 -55.8 63 -99 SPO 1997 04 12 04 41 26 9.0 -9 668.80 -55.6 -55.6 -55.8 63 -99 SPO 1997 04 12 04 42 26 8.8 -9 668.80 -55.6 -55.7 -55.8 63 -99 SPO 1997 04 12 04 43 24 8.4 -9 668.80 -55.7 -55.7 -55.8 63 -99 SPO 1997 04 12 04 44 23 8.6 -9 668.90 -55.7 -55.8 -55.8 63 -99 SPO 1997 04 12 04 45 25 8.6 -9 668.80 -55.7 -55.8 -55.8 62 -99 SPO 1997 04 12 04 46 25 8.6 -9 668.80 -55.7 -55.8 -55.8 62 -99 SPO 1997 04 12 04 47 25 8.6 -9 668.80 -55.7 -55.8 -55.8 62 -99 SPO 1997 04 12 04 48 25 8.3 -9 668.80 -55.7 -55.8 -55.9 63 -99 SPO 1997 04 12 04 49 25 8.4 -9 668.80 -55.8 -55.8 -55.9 64 -99 SPO 1997 04 12 04 50 23 7.8 -9 668.90 -55.8 -55.8 -55.9 64 -99 SPO 1997 04 12 04 51 22 7.8 -9 669.00 -55.8 -55.8 -55.9 64 -99 SPO 1997 04 12 04 52 21 7.5 -9 669.00 -55.7 -55.8 -55.9 63 -99 SPO 1997 04 12 04 53 21 8.0 -9 668.90 -55.7 -55.8 -55.9 63 -99 SPO 1997 04 12 04 54 21 7.5 -9 669.00 -55.8 -55.8 -55.9 63 -99 SPO 1997 04 12 04 55 20 7.7 -9 669.00 -55.8 -55.8 -55.9 62 -99 SPO 1997 04 12 04 56 21 7.5 -9 668.90 -55.8 -55.8 -56.0 62 -99 SPO 1997 04 12 04 57 24 8.2 -9 668.80 -55.8 -55.9 -56.0 61 -99 SPO 1997 04 12 04 58 23 8.1 -9 668.80 -55.8 -55.9 -56.0 61 -99 SPO 1997 04 12 04 59 22 8.2 -9 668.90 -55.8 -56.0 -56.0 61 -99 SPO 1997 04 12 05 00 22 8.1 -9 668.90 -55.9 -56.0 -56.0 63 0 SPO 1997 04 12 05 01 24 7.8 -9 668.80 -55.9 -56.0 -56.0 63 -99 SPO 1997 04 12 05 02 25 7.7 -9 668.90 -55.9 -56.0 -56.1 63 -99 SPO 1997 04 12 05 03 26 8.3 -9 668.80 -56.0 -56.1 -56.1 64 -99 SPO 1997 04 12 05 04 27 8.8 -9 668.80 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 12 05 05 24 8.4 -9 668.80 -56.0 -56.0 -56.1 64 -99 SPO 1997 04 12 05 06 24 8.2 -9 668.80 -56.0 -56.0 -56.1 63 -99 SPO 1997 04 12 05 07 25 8.3 -9 668.80 -56.0 -56.0 -56.1 62 -99 SPO 1997 04 12 05 08 24 8.0 -9 668.80 -56.0 -56.0 -56.1 62 -99 SPO 1997 04 12 05 09 25 8.3 -9 668.80 -56.0 -56.0 -56.1 62 -99 SPO 1997 04 12 05 10 26 8.0 -9 668.80 -56.0 -56.0 -56.2 62 -99 SPO 1997 04 12 05 11 27 8.5 -9 668.80 -56.0 -56.0 -56.1 63 -99 SPO 1997 04 12 05 12 27 8.4 -9 668.80 -56.0 -56.0 -56.1 63 -99 SPO 1997 04 12 05 13 25 8.4 -9 668.80 -56.0 -56.0 -56.2 63 -99 SPO 1997 04 12 05 14 24 8.0 -9 668.80 -56.0 -56.0 -56.2 63 -99 SPO 1997 04 12 05 15 24 8.1 -9 668.90 -56.0 -56.1 -56.2 62 -99 SPO 1997 04 12 05 16 26 8.8 -9 668.80 -56.1 -56.1 -56.2 63 -99 SPO 1997 04 12 05 17 26 8.4 -9 668.80 -56.1 -56.1 -56.1 62 -99 SPO 1997 04 12 05 18 27 8.6 -9 668.80 -56.1 -56.2 -56.2 61 -99 SPO 1997 04 12 05 19 30 9.2 -9 668.60 -56.1 -56.2 -56.2 61 -99 SPO 1997 04 12 05 20 30 9.4 -9 668.60 -56.2 -56.2 -56.3 62 -99 SPO 1997 04 12 05 21 29 9.7 -9 668.60 -56.2 -56.2 -56.2 62 -99 SPO 1997 04 12 05 22 27 8.8 -9 668.70 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 12 05 23 24 8.1 -9 668.80 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 12 05 24 19 7.1 -9 669.00 -56.1 -56.2 -56.3 62 -99 SPO 1997 04 12 05 25 17 6.7 -9 669.00 -56.1 -56.2 -56.3 62 -99 SPO 1997 04 12 05 26 16 6.6 -9 669.00 -56.2 -56.1 -56.3 63 -99 SPO 1997 04 12 05 27 18 6.9 -9 669.00 -56.2 -56.2 -56.3 63 -99 SPO 1997 04 12 05 28 22 6.8 -9 669.00 -56.2 -56.2 -56.3 62 -99 SPO 1997 04 12 05 29 22 6.8 -9 668.90 -56.2 -56.2 -56.3 62 -99 SPO 1997 04 12 05 30 24 7.5 -9 668.90 -56.2 -56.1 -56.3 61 -99 SPO 1997 04 12 05 31 28 7.9 -9 668.80 -56.2 -56.2 -56.3 61 -99 SPO 1997 04 12 05 32 28 8.2 -9 668.80 -56.2 -56.2 -56.3 61 -99 SPO 1997 04 12 05 33 27 8.5 -9 668.80 -56.3 -56.2 -56.3 63 -99 SPO 1997 04 12 05 34 26 7.8 -9 668.80 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 12 05 35 24 7.2 -9 668.90 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 12 05 36 22 7.6 -9 668.90 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 12 05 37 21 7.4 -9 668.90 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 12 05 38 21 7.5 -9 669.00 -56.3 -56.3 -56.4 63 -99 SPO 1997 04 12 05 39 22 6.9 -9 668.90 -56.2 -56.3 -56.4 62 -99 SPO 1997 04 12 05 40 18 6.7 -9 669.00 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 12 05 41 19 7.0 -9 669.00 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 12 05 42 23 7.1 -9 669.00 -56.3 -56.3 -56.4 61 -99 SPO 1997 04 12 05 43 21 7.2 -9 669.00 -56.3 -56.3 -56.4 61 -99 SPO 1997 04 12 05 44 23 7.2 -9 669.00 -56.3 -56.3 -56.4 61 -99 SPO 1997 04 12 05 45 26 7.5 -9 668.90 -56.3 -56.3 -56.4 62 -99 SPO 1997 04 12 05 46 25 8.0 -9 668.90 -56.3 -56.2 -56.4 61 -99 SPO 1997 04 12 05 47 25 7.5 -9 668.90 -56.3 -56.2 -56.4 61 -99 SPO 1997 04 12 05 48 24 8.0 -9 668.80 -56.3 -56.3 -56.5 62 -99 SPO 1997 04 12 05 49 25 7.7 -9 668.80 -56.3 -56.4 -56.5 61 -99 SPO 1997 04 12 05 50 26 8.1 -9 668.80 -56.4 -56.4 -56.5 61 -99 SPO 1997 04 12 05 51 24 7.6 -9 668.90 -56.4 -56.4 -56.5 61 -99 SPO 1997 04 12 05 52 22 7.3 -9 669.00 -56.4 -56.4 -56.5 61 -99 SPO 1997 04 12 05 53 26 6.9 -9 668.90 -56.4 -56.4 -56.5 61 -99 SPO 1997 04 12 05 54 22 6.8 -9 669.00 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 12 05 55 22 6.8 -9 669.00 -56.4 -56.4 -56.5 61 -99 SPO 1997 04 12 05 56 21 6.8 -9 669.00 -56.4 -56.5 -56.6 61 -99 SPO 1997 04 12 05 57 21 6.3 -9 669.00 -56.4 -56.4 -56.6 62 -99 SPO 1997 04 12 05 58 26 6.9 -9 668.90 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 12 05 59 26 7.5 -9 668.90 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 12 06 00 25 7.2 -9 669.00 -56.5 -56.4 -56.6 63 0 SPO 1997 04 12 06 01 25 6.8 -9 669.00 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 12 06 02 27 7.1 -9 669.00 -56.5 -56.4 -56.7 61 -99 SPO 1997 04 12 06 03 28 7.2 -9 668.90 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 12 06 04 25 7.2 -9 669.00 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 12 06 05 26 7.1 -9 668.90 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 12 06 06 25 7.2 -9 668.90 -56.5 -56.5 -56.7 61 -99 SPO 1997 04 12 06 07 25 7.2 -9 668.90 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 12 06 08 24 7.0 -9 668.90 -56.7 -56.6 -56.7 64 -99 SPO 1997 04 12 06 09 27 7.1 -9 668.90 -56.7 -56.5 -56.7 64 -99 SPO 1997 04 12 06 10 27 7.9 -9 668.90 -56.6 -56.5 -56.7 63 -99 SPO 1997 04 12 06 11 27 7.2 -9 668.90 -56.5 -56.6 -56.7 62 -99 SPO 1997 04 12 06 12 23 7.2 -9 669.00 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 12 06 13 25 6.8 -9 669.00 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 12 06 14 24 6.9 -9 669.00 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 12 06 15 22 6.9 -9 669.00 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 12 06 16 27 7.5 -9 668.90 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 12 06 17 28 7.6 -9 668.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 12 06 18 27 7.2 -9 668.90 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 12 06 19 27 6.9 -9 668.90 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 12 06 20 27 7.2 -9 668.90 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 12 06 21 26 6.6 -9 669.00 -56.6 -56.6 -56.8 61 -99 SPO 1997 04 12 06 22 23 6.2 -9 669.00 -56.6 -56.6 -56.8 62 -99 SPO 1997 04 12 06 23 27 7.2 -9 669.00 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 24 28 7.3 -9 668.90 -56.7 -56.6 -56.7 63 -99 SPO 1997 04 12 06 25 27 6.6 -9 669.00 -56.7 -56.7 -56.8 63 -99 SPO 1997 04 12 06 26 26 6.9 -9 669.00 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 12 06 27 26 7.1 -9 669.00 -56.6 -56.6 -56.8 61 -99 SPO 1997 04 12 06 28 28 6.9 -9 669.00 -56.6 -56.6 -56.8 61 -99 SPO 1997 04 12 06 29 27 6.7 -9 669.00 -56.7 -56.6 -56.9 63 -99 SPO 1997 04 12 06 30 27 7.2 -9 669.00 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 31 27 7.0 -9 669.00 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 32 27 7.0 -9 669.00 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 33 24 6.2 -9 669.00 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 34 21 6.0 -9 669.10 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 12 06 35 23 6.5 -9 669.00 -56.7 -56.6 -56.8 61 -99 SPO 1997 04 12 06 36 25 6.3 -9 669.00 -56.7 -56.7 -56.9 61 -99 SPO 1997 04 12 06 37 25 6.5 -9 669.00 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 38 25 6.5 -9 669.00 -56.8 -56.8 -56.9 61 -99 SPO 1997 04 12 06 39 25 6.5 -9 669.00 -56.7 -56.8 -56.9 60 -99 SPO 1997 04 12 06 40 23 6.9 -9 669.00 -56.8 -56.7 -56.9 62 -99 SPO 1997 04 12 06 41 23 6.6 -9 669.00 -56.8 -56.8 -56.9 63 -99 SPO 1997 04 12 06 42 28 7.5 -9 668.90 -56.8 -56.8 -56.9 63 -99 SPO 1997 04 12 06 43 31 8.4 -9 668.70 -56.8 -56.8 -56.9 63 -99 SPO 1997 04 12 06 44 29 8.0 -9 668.70 -56.8 -56.7 -56.9 63 -99 SPO 1997 04 12 06 45 27 7.8 -9 668.80 -56.8 -56.7 -56.9 63 -99 SPO 1997 04 12 06 46 28 7.6 -9 668.80 -56.8 -56.7 -56.9 62 -99 SPO 1997 04 12 06 47 27 7.5 -9 668.80 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 48 28 7.8 -9 668.80 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 49 29 8.1 -9 668.80 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 50 25 7.2 -9 668.90 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 51 22 6.9 -9 669.00 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 52 21 6.6 -9 669.00 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 12 06 53 22 6.2 -9 669.00 -56.8 -56.8 -57.0 62 -99 SPO 1997 04 12 06 54 21 6.5 -9 669.00 -56.8 -56.8 -57.0 62 -99 SPO 1997 04 12 06 55 20 6.3 -9 669.10 -56.8 -56.8 -57.0 62 -99 SPO 1997 04 12 06 56 20 5.8 -9 669.10 -56.8 -56.8 -57.0 62 -99 SPO 1997 04 12 06 57 20 6.0 -9 669.10 -56.8 -56.8 -57.0 61 -99 SPO 1997 04 12 06 58 18 5.7 -9 669.20 -56.8 -56.9 -57.0 60 -99 SPO 1997 04 12 06 59 19 5.7 -9 669.20 -56.9 -56.9 -57.0 61 -99 SPO 1997 04 12 07 00 22 6.3 -9 669.10 -56.9 -56.9 -57.0 60 0 SPO 1997 04 12 07 01 22 6.3 -9 669.10 -56.9 -56.8 -57.0 60 -99 SPO 1997 04 12 07 02 25 6.6 -9 669.10 -56.9 -56.8 -57.0 60 -99 SPO 1997 04 12 07 03 24 6.1 -9 669.10 -56.9 -56.9 -57.1 61 -99 SPO 1997 04 12 07 04 20 6.0 -9 669.20 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 12 07 05 22 5.8 -9 669.20 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 12 07 06 22 5.8 -9 669.20 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 12 07 07 22 6.0 -9 669.20 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 12 07 08 22 5.9 -9 669.20 -57.0 -56.9 -57.1 60 -99 SPO 1997 04 12 07 09 22 6.0 -9 669.20 -57.0 -56.9 -57.1 60 -99 SPO 1997 04 12 07 10 21 5.9 -9 669.20 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 12 07 11 24 6.4 -9 669.20 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 12 07 12 22 6.3 -9 669.20 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 12 07 13 19 5.7 -9 669.30 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 12 07 14 20 6.0 -9 669.30 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 12 07 15 22 6.3 -9 669.20 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 12 07 16 22 6.3 -9 669.20 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 12 07 17 20 6.3 -9 669.20 -57.1 -57.0 -57.1 62 -99 SPO 1997 04 12 07 18 20 5.6 -9 669.30 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 07 19 23 6.2 -9 669.20 -57.1 -57.0 -57.3 62 -99 SPO 1997 04 12 07 20 23 6.4 -9 669.20 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 12 07 21 25 6.4 -9 669.20 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 12 07 22 26 6.8 -9 669.20 -57.2 -56.9 -57.2 62 -99 SPO 1997 04 12 07 23 28 7.3 -9 669.10 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 12 07 24 26 6.8 -9 669.20 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 12 07 25 27 7.5 -9 669.10 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 12 07 26 25 6.9 -9 669.20 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 12 07 27 25 7.2 -9 669.10 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 12 07 28 25 7.2 -9 669.20 -57.1 -57.1 -57.3 60 -99 SPO 1997 04 12 07 29 24 7.0 -9 669.10 -57.1 -57.1 -57.2 61 -99 SPO 1997 04 12 07 30 26 6.9 -9 669.20 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 12 07 31 25 6.8 -9 669.20 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 12 07 32 24 6.5 -9 669.20 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 12 07 33 24 6.5 -9 669.20 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 12 07 34 24 7.0 -9 669.20 -57.2 -57.0 -57.4 60 -99 SPO 1997 04 12 07 35 24 6.9 -9 669.20 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 12 07 36 24 7.0 -9 669.20 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 12 07 37 26 7.1 -9 669.20 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 12 07 38 26 7.2 -9 669.10 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 12 07 39 25 6.7 -9 669.20 -57.2 -57.0 -57.4 62 -99 SPO 1997 04 12 07 40 24 6.4 -9 669.20 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 07 41 25 6.7 -9 669.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 07 42 25 6.6 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 43 25 6.8 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 44 25 6.2 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 45 27 6.7 -9 669.20 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 07 46 29 6.8 -9 669.20 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 07 47 29 6.8 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 48 28 6.6 -9 669.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 07 49 27 6.5 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 50 27 6.5 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 07 51 27 6.8 -9 669.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 07 52 27 6.8 -9 669.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 07 53 27 6.8 -9 669.10 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 07 54 30 7.2 -9 669.10 -57.3 -57.1 -57.5 61 -99 SPO 1997 04 12 07 55 28 7.0 -9 669.10 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 07 56 26 6.1 -9 669.20 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 07 57 25 6.5 -9 669.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 07 58 26 6.6 -9 669.20 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 07 59 27 6.7 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 00 27 6.4 -9 669.20 -57.3 -57.2 -57.5 63 0 SPO 1997 04 12 08 01 26 6.5 -9 669.20 -57.3 -57.2 -57.5 62 -99 SPO 1997 04 12 08 02 25 6.6 -9 669.20 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 08 03 24 6.4 -9 669.30 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 04 24 6.3 -9 669.30 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 05 25 6.4 -9 669.20 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 08 06 26 6.5 -9 669.30 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 12 08 07 26 6.1 -9 669.30 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 12 08 08 25 6.0 -9 669.30 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 12 08 09 28 6.3 -9 669.30 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 12 08 10 28 6.6 -9 669.20 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 08 11 28 6.6 -9 669.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 08 12 30 7.0 -9 669.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 12 08 13 28 6.7 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 14 30 7.0 -9 669.20 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 15 28 6.9 -9 669.20 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 12 08 16 30 7.0 -9 669.20 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 12 08 17 30 7.3 -9 669.10 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 08 18 30 7.1 -9 669.10 -57.3 -57.2 -57.5 61 -99 SPO 1997 04 12 08 19 29 7.3 -9 669.10 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 12 08 20 29 7.2 -9 669.10 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 12 08 21 28 7.7 -9 669.10 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 12 08 22 29 7.6 -9 669.10 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 08 23 27 7.7 -9 669.10 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 08 24 28 7.7 -9 669.10 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 25 29 7.9 -9 669.00 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 26 30 8.0 -9 669.00 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 27 29 7.7 -9 669.00 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 08 28 30 7.6 -9 669.00 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 08 29 29 7.8 -9 669.00 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 12 08 30 27 7.8 -9 669.00 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 08 31 30 7.3 -9 669.00 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 12 08 32 30 7.9 -9 669.00 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 33 30 7.7 -9 669.00 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 12 08 34 29 8.2 -9 669.00 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 12 08 35 32 8.2 -9 669.00 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 12 08 36 32 7.9 -9 669.00 -57.3 -57.1 -57.3 63 -99 SPO 1997 04 12 08 37 31 8.0 -9 669.00 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 38 35 8.4 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 39 36 8.1 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 40 33 8.3 -9 668.90 -57.3 -57.0 -57.4 63 -99 SPO 1997 04 12 08 41 33 7.9 -9 669.00 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 42 30 7.4 -9 669.00 -57.3 -57.1 -57.3 63 -99 SPO 1997 04 12 08 43 31 7.9 -9 669.00 -57.3 -57.0 -57.4 63 -99 SPO 1997 04 12 08 44 32 8.1 -9 669.00 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 45 31 7.9 -9 669.00 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 08 46 32 8.6 -9 668.90 -57.3 -57.1 -57.3 64 -99 SPO 1997 04 12 08 47 31 8.6 -9 668.90 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 08 48 33 8.4 -9 668.90 -57.2 -57.1 -57.4 63 -99 SPO 1997 04 12 08 49 33 8.4 -9 668.80 -57.2 -57.1 -57.4 63 -99 SPO 1997 04 12 08 50 33 8.5 -9 668.80 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 08 51 29 8.1 -9 668.80 -57.3 -57.1 -57.3 63 -99 SPO 1997 04 12 08 52 29 8.2 -9 668.80 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 53 29 8.7 -9 668.80 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 54 30 8.5 -9 668.80 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 55 29 9.0 -9 668.70 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 56 29 9.1 -9 668.70 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 57 29 9.1 -9 668.80 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 08 58 29 9.1 -9 668.70 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 12 08 59 29 8.7 -9 668.70 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 09 00 26 9.2 -9 668.80 -57.2 -56.9 -57.3 63 0 SPO 1997 04 12 09 01 26 9.3 -9 668.80 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 12 09 02 26 9.1 -9 668.70 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 12 09 03 23 9.2 -9 668.80 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 12 09 04 22 8.7 -9 668.80 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 09 05 24 8.8 -9 668.80 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 09 06 23 9.3 -9 668.80 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 09 07 23 8.8 -9 668.80 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 09 08 22 8.8 -9 668.80 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 12 09 09 21 8.8 -9 668.80 -57.2 -57.0 -57.3 64 -99 SPO 1997 04 12 09 10 20 8.9 -9 668.90 -57.2 -57.0 -57.2 64 -99 SPO 1997 04 12 09 11 20 8.8 -9 668.90 -57.2 -57.0 -57.3 64 -99 SPO 1997 04 12 09 12 23 8.8 -9 668.80 -57.2 -57.0 -57.3 64 -99 SPO 1997 04 12 09 13 22 8.3 -9 668.90 -57.2 -57.0 -57.3 64 -99 SPO 1997 04 12 09 14 22 8.5 -9 668.90 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 09 15 23 8.8 -9 668.90 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 09 16 21 9.1 -9 669.00 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 09 17 22 8.4 -9 669.00 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 12 09 18 22 8.5 -9 669.00 -57.2 -57.1 -57.3 64 -99 SPO 1997 04 12 09 19 22 8.8 -9 668.90 -57.2 -57.1 -57.3 64 -99 SPO 1997 04 12 09 20 22 8.4 -9 669.00 -57.2 -57.1 -57.3 64 -99 SPO 1997 04 12 09 21 22 8.4 -9 668.90 -57.2 -57.1 -57.3 64 -99 SPO 1997 04 12 09 22 23 8.7 -9 668.90 -57.2 -57.1 -57.3 64 -99 SPO 1997 04 12 09 23 22 8.5 -9 669.00 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 09 24 23 8.6 -9 668.90 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 09 25 24 8.9 -9 668.90 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 09 26 27 9.0 -9 668.80 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 12 09 27 26 9.0 -9 668.80 -57.2 -57.1 -57.4 63 -99 SPO 1997 04 12 09 28 26 8.6 -9 668.90 -57.2 -57.1 -57.4 63 -99 SPO 1997 04 12 09 29 25 8.3 -9 668.90 -57.2 -57.1 -57.4 63 -99 SPO 1997 04 12 09 30 25 8.2 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 09 31 24 8.0 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 09 32 24 8.3 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 09 33 25 8.6 -9 668.90 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 12 09 34 25 8.4 -9 668.90 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 12 09 35 26 8.5 -9 668.80 -57.3 -57.2 -57.5 63 -99 SPO 1997 04 12 09 36 26 8.8 -9 668.90 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 12 09 37 26 8.6 -9 668.90 -57.3 -57.2 -57.5 63 -99 SPO 1997 04 12 09 38 28 8.9 -9 668.80 -57.3 -57.2 -57.5 62 -99 SPO 1997 04 12 09 39 28 8.9 -9 668.80 -57.4 -57.2 -57.4 63 -99 SPO 1997 04 12 09 40 25 8.7 -9 668.90 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 12 09 41 25 8.2 -9 668.90 -57.3 -57.2 -57.5 63 -99 SPO 1997 04 12 09 42 27 8.5 -9 668.90 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 09 43 25 8.2 -9 668.90 -57.4 -57.2 -57.5 64 -99 SPO 1997 04 12 09 44 24 8.3 -9 668.90 -57.4 -57.2 -57.5 64 -99 SPO 1997 04 12 09 45 26 8.2 -9 668.90 -57.4 -57.2 -57.5 64 -99 SPO 1997 04 12 09 46 26 8.1 -9 668.90 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 09 47 24 8.3 -9 669.00 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 09 48 24 8.2 -9 669.00 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 09 49 25 8.0 -9 669.00 -57.4 -57.2 -57.5 63 -99 SPO 1997 04 12 09 50 24 7.9 -9 669.00 -57.4 -57.3 -57.5 63 -99 SPO 1997 04 12 09 51 26 8.4 -9 669.00 -57.4 -57.3 -57.5 63 -99 SPO 1997 04 12 09 52 26 8.3 -9 669.00 -57.4 -57.3 -57.5 63 -99 SPO 1997 04 12 09 53 27 8.1 -9 669.00 -57.4 -57.3 -57.5 63 -99 SPO 1997 04 12 09 54 25 8.2 -9 669.00 -57.5 -57.3 -57.6 64 -99 SPO 1997 04 12 09 55 26 8.1 -9 669.00 -57.5 -57.3 -57.5 64 -99 SPO 1997 04 12 09 56 26 8.0 -9 669.00 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 09 57 24 7.5 -9 669.00 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 09 58 26 8.1 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 09 59 25 8.0 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 10 00 24 7.7 -9 669.00 -57.5 -57.3 -57.6 62 0 SPO 1997 04 12 10 01 26 8.0 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 10 02 25 7.5 -9 669.00 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 03 26 7.6 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 10 04 25 7.0 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 10 05 26 7.5 -9 669.00 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 12 10 06 26 7.4 -9 669.00 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 07 26 7.6 -9 668.90 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 12 10 08 28 7.5 -9 668.90 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 12 10 09 28 7.5 -9 668.90 -57.6 -57.5 -57.7 63 -99 SPO 1997 04 12 10 10 27 7.8 -9 668.90 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 12 10 11 28 7.6 -9 668.90 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 12 10 12 27 8.0 -9 668.90 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 12 10 13 28 8.1 -9 668.90 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 12 10 14 28 8.1 -9 668.90 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 12 10 15 26 8.3 -9 668.90 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 12 10 16 27 8.4 -9 668.80 -57.6 -57.4 -57.6 63 -99 SPO 1997 04 12 10 17 27 8.6 -9 668.80 -57.6 -57.3 -57.7 63 -99 SPO 1997 04 12 10 18 25 8.4 -9 668.80 -57.6 -57.3 -57.6 63 -99 SPO 1997 04 12 10 19 26 8.4 -9 668.80 -57.6 -57.3 -57.6 63 -99 SPO 1997 04 12 10 20 25 8.7 -9 668.80 -57.6 -57.3 -57.6 62 -99 SPO 1997 04 12 10 21 27 8.6 -9 668.70 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 12 10 22 28 8.9 -9 668.70 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 12 10 23 27 9.2 -9 668.70 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 12 10 24 29 9.0 -9 668.60 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 12 10 25 30 9.5 -9 668.60 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 26 30 9.8 -9 668.60 -57.5 -57.3 -57.5 63 -99 SPO 1997 04 12 10 27 30 8.8 -9 668.60 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 28 28 8.7 -9 668.60 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 29 29 8.9 -9 668.60 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 30 27 8.5 -9 668.60 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 31 25 8.8 -9 668.70 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 32 25 8.6 -9 668.70 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 33 25 8.7 -9 668.70 -57.5 -57.3 -57.5 63 -99 SPO 1997 04 12 10 34 26 8.3 -9 668.70 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 35 27 8.9 -9 668.70 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 36 27 8.8 -9 668.60 -57.5 -57.3 -57.6 63 -99 SPO 1997 04 12 10 37 27 9.1 -9 668.60 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 38 29 9.0 -9 668.60 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 39 28 9.1 -9 668.60 -57.5 -57.4 -57.6 64 -99 SPO 1997 04 12 10 40 27 9.1 -9 668.60 -57.5 -57.4 -57.6 64 -99 SPO 1997 04 12 10 41 26 8.5 -9 668.70 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 42 27 8.5 -9 668.70 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 43 25 8.6 -9 668.70 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 12 10 44 23 8.9 -9 668.70 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 12 10 45 23 8.6 -9 668.70 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 12 10 46 23 9.0 -9 668.80 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 12 10 47 24 8.7 -9 668.70 -57.4 -57.3 -57.6 62 -99 SPO 1997 04 12 10 48 23 9.0 -9 668.80 -57.4 -57.3 -57.5 62 -99 SPO 1997 04 12 10 49 23 8.6 -9 668.80 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 10 50 23 8.2 -9 668.80 -57.4 -57.4 -57.6 63 -99 SPO 1997 04 12 10 51 24 8.8 -9 668.80 -57.4 -57.4 -57.6 63 -99 SPO 1997 04 12 10 52 22 8.6 -9 668.80 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 10 53 22 8.5 -9 668.80 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 10 54 21 8.6 -9 668.80 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 12 10 55 20 8.4 -9 668.80 -57.4 -57.5 -57.6 61 -99 SPO 1997 04 12 10 56 19 8.1 -9 668.90 -57.4 -57.5 -57.6 61 -99 SPO 1997 04 12 10 57 21 8.1 -9 668.90 -57.5 -57.5 -57.6 62 -99 SPO 1997 04 12 10 58 19 8.5 -9 668.90 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 10 59 21 8.3 -9 668.90 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 11 00 19 8.1 -9 669.00 -57.4 -57.5 -57.6 62 0 SPO 1997 04 12 11 01 22 7.8 -9 668.90 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 02 21 8.3 -9 668.90 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 03 22 8.1 -9 668.90 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 04 22 7.8 -9 669.00 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 05 21 8.3 -9 669.00 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 06 22 8.3 -9 669.00 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 11 07 21 8.2 -9 669.00 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 11 08 21 8.4 -9 669.00 -57.4 -57.4 -57.4 62 -99 SPO 1997 04 12 11 09 23 8.1 -9 669.00 -57.3 -57.5 -57.4 62 -99 SPO 1997 04 12 11 10 24 7.9 -9 668.90 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 11 11 23 8.2 -9 668.90 -57.3 -57.5 -57.5 63 -99 SPO 1997 04 12 11 12 24 8.4 -9 668.90 -57.3 -57.5 -57.4 63 -99 SPO 1997 04 12 11 13 24 8.7 -9 668.90 -57.3 -57.5 -57.4 63 -99 SPO 1997 04 12 11 14 23 8.2 -9 668.90 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 15 22 8.2 -9 668.90 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 16 22 8.4 -9 668.90 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 17 23 8.2 -9 668.90 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 18 22 8.4 -9 668.90 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 19 20 8.1 -9 669.00 -57.2 -57.4 -57.4 62 -99 SPO 1997 04 12 11 20 21 7.6 -9 669.00 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 21 21 7.3 -9 669.00 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 12 11 22 21 7.6 -9 669.00 -57.3 -57.4 -57.4 64 -99 SPO 1997 04 12 11 23 21 8.3 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 24 21 8.2 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 25 21 7.9 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 26 20 7.5 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 27 19 8.1 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 28 19 8.0 -9 669.00 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 29 16 7.5 -9 669.10 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 12 11 30 17 7.7 -9 669.10 -57.2 -57.3 -57.2 63 -99 SPO 1997 04 12 11 31 18 8.1 -9 669.10 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 12 11 32 17 7.6 -9 669.10 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 12 11 33 16 7.7 -9 669.20 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 12 11 34 17 7.5 -9 669.20 -57.1 -57.3 -57.2 64 -99 SPO 1997 04 12 11 35 17 7.6 -9 669.20 -57.1 -57.3 -57.2 64 -99 SPO 1997 04 12 11 36 17 7.3 -9 669.20 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 12 11 37 16 8.2 -9 669.10 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 12 11 38 17 8.4 -9 669.10 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 12 11 39 15 8.0 -9 669.20 -57.0 -57.2 -57.0 63 -99 SPO 1997 04 12 11 40 16 8.0 -9 669.20 -56.9 -57.2 -57.0 61 -99 SPO 1997 04 12 11 41 14 7.9 -9 669.20 -56.9 -57.2 -57.0 62 -99 SPO 1997 04 12 11 42 15 7.5 -9 669.20 -56.9 -57.2 -57.0 63 -99 SPO 1997 04 12 11 43 13 7.7 -9 669.20 -56.8 -57.2 -57.0 62 -99 SPO 1997 04 12 11 44 15 7.5 -9 669.20 -56.8 -57.2 -57.0 63 -99 SPO 1997 04 12 11 45 16 7.7 -9 669.20 -56.8 -57.2 -57.0 64 -99 SPO 1997 04 12 11 46 15 8.2 -9 669.20 -56.8 -57.2 -57.0 64 -99 SPO 1997 04 12 11 47 16 8.4 -9 669.20 -56.8 -57.1 -57.0 64 -99 SPO 1997 04 12 11 48 17 8.5 -9 669.10 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 11 49 16 8.1 -9 669.20 -56.8 -57.1 -57.0 64 -99 SPO 1997 04 12 11 50 15 7.5 -9 669.20 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 11 51 18 8.3 -9 669.20 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 11 52 17 8.2 -9 669.20 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 11 53 17 8.4 -9 669.20 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 11 54 17 8.1 -9 669.20 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 11 55 18 8.7 -9 669.20 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 11 56 19 8.2 -9 669.20 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 11 57 15 8.5 -9 669.20 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 11 58 15 8.1 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 11 59 15 7.9 -9 669.30 -56.7 -57.1 -56.9 63 -99 SPO 1997 04 12 12 00 17 8.2 -9 669.30 -56.8 -57.1 -56.9 64 0 SPO 1997 04 12 12 01 17 7.8 -9 669.30 -56.7 -57.1 -56.9 63 -99 SPO 1997 04 12 12 02 17 7.8 -9 669.30 -56.7 -57.1 -56.9 63 -99 SPO 1997 04 12 12 03 18 8.0 -9 669.20 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 04 19 8.1 -9 669.30 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 05 19 7.5 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 06 17 7.5 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 07 18 7.2 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 08 18 8.1 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 09 17 7.7 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 10 18 7.6 -9 669.30 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 12 12 11 19 7.8 -9 669.20 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 12 16 7.9 -9 669.30 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 13 15 7.8 -9 669.30 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 14 12 8.0 -9 669.30 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 15 14 8.3 -9 669.30 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 12 12 16 13 7.9 -9 669.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 12 17 14 7.9 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 12 18 15 8.0 -9 669.30 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 12 19 14 8.0 -9 669.30 -56.8 -57.0 -57.0 64 -99 SPO 1997 04 12 12 20 16 7.9 -9 669.20 -56.8 -57.0 -57.0 64 -99 SPO 1997 04 12 12 21 16 7.3 -9 669.20 -56.8 -57.0 -57.0 64 -99 SPO 1997 04 12 12 22 16 7.8 -9 669.30 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 23 16 8.0 -9 669.20 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 24 16 8.2 -9 669.20 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 25 16 8.0 -9 669.20 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 26 16 7.6 -9 669.30 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 27 15 7.8 -9 669.20 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 12 12 28 14 8.1 -9 669.30 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 12 29 13 8.1 -9 669.30 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 12 30 11 7.7 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 12 31 12 7.8 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 12 32 12 7.9 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 12 33 12 7.8 -9 669.30 -56.8 -57.1 -56.9 64 -99 SPO 1997 04 12 12 34 11 8.1 -9 669.30 -56.7 -57.1 -56.9 63 -99 SPO 1997 04 12 12 35 11 8.5 -9 669.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 12 36 12 8.8 -9 669.30 -56.8 -57.0 -56.8 64 -99 SPO 1997 04 12 12 37 9 8.9 -9 669.30 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 12 38 11 7.7 -9 669.30 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 12 12 39 10 7.9 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 40 10 7.7 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 41 11 7.8 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 42 11 7.8 -9 669.30 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 43 8 7.6 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 44 10 8.2 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 45 10 8.3 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 46 11 8.4 -9 669.30 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 47 11 8.4 -9 669.30 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 48 10 8.8 -9 669.40 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 12 49 11 7.5 -9 669.40 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 12 50 11 8.3 -9 669.40 -56.6 -57.0 -56.8 62 -99 SPO 1997 04 12 12 51 11 8.2 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 52 10 7.8 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 53 9 7.6 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 12 54 9 7.5 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 55 9 7.2 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 56 11 7.6 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 57 9 7.8 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 12 58 10 8.4 -9 669.50 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 12 59 9 7.3 -9 669.40 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 13 00 8 7.6 -9 669.50 -56.7 -56.9 -56.8 62 0 SPO 1997 04 12 13 01 7 7.0 -9 669.50 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 13 02 9 7.9 -9 669.50 -56.6 -57.0 -56.8 62 -99 SPO 1997 04 12 13 03 9 7.7 -9 669.50 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 04 9 7.3 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 05 9 7.4 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 06 8 7.6 -9 669.50 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 07 7 7.7 -9 669.50 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 08 9 7.7 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 09 10 7.5 -9 669.50 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 13 10 9 7.7 -9 669.50 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 13 11 10 8.1 -9 669.50 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 13 12 10 8.3 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 13 12 7.7 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 14 11 7.3 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 15 10 8.2 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 16 11 7.8 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 17 10 7.9 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 18 11 8.2 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 19 10 7.6 -9 669.50 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 20 10 7.9 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 21 12 7.9 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 22 12 8.1 -9 669.50 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 23 12 7.6 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 24 12 7.5 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 25 11 8.0 -9 669.50 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 26 10 7.9 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 27 12 7.6 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 28 12 7.6 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 29 11 7.5 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 30 12 7.5 -9 669.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 31 11 7.4 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 32 11 7.6 -9 669.50 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 13 33 11 7.6 -9 669.40 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 13 34 12 7.3 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 35 12 7.6 -9 669.40 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 36 14 7.7 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 37 12 8.2 -9 669.40 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 38 13 7.3 -9 669.40 -56.7 -57.0 -56.8 65 -99 SPO 1997 04 12 13 39 14 7.6 -9 669.40 -56.6 -57.0 -56.8 64 -99 SPO 1997 04 12 13 40 14 7.1 -9 669.50 -56.6 -56.9 -56.8 64 -99 SPO 1997 04 12 13 41 14 7.5 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 42 12 8.0 -9 669.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 43 14 7.7 -9 669.50 -56.6 -56.9 -56.8 63 -99 SPO 1997 04 12 13 44 12 7.3 -9 669.50 -56.6 -56.9 -56.8 63 -99 SPO 1997 04 12 13 45 13 7.5 -9 669.50 -56.6 -56.9 -56.8 63 -99 SPO 1997 04 12 13 46 13 7.7 -9 669.50 -56.6 -56.9 -56.8 63 -99 SPO 1997 04 12 13 47 12 7.5 -9 669.60 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 48 13 7.4 -9 669.60 -56.6 -56.9 -56.8 64 -99 SPO 1997 04 12 13 49 12 7.4 -9 669.60 -56.6 -56.9 -56.8 64 -99 SPO 1997 04 12 13 50 12 7.2 -9 669.60 -56.6 -57.0 -56.8 64 -99 SPO 1997 04 12 13 51 11 7.4 -9 669.60 -56.6 -57.0 -56.8 64 -99 SPO 1997 04 12 13 52 10 7.3 -9 669.60 -56.6 -57.0 -56.8 64 -99 SPO 1997 04 12 13 53 10 7.2 -9 669.60 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 54 11 6.8 -9 669.60 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 13 55 12 7.5 -9 669.60 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 56 12 7.0 -9 669.60 -56.6 -57.0 -56.8 63 -99 SPO 1997 04 12 13 57 12 7.4 -9 669.60 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 58 12 7.0 -9 669.70 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 13 59 11 7.4 -9 669.70 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 14 00 11 7.5 -9 669.70 -56.7 -56.9 -56.8 64 0 SPO 1997 04 12 14 01 13 7.3 -9 669.70 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 14 02 14 6.9 -9 669.80 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 14 03 9 6.9 -9 669.80 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 14 04 12 6.1 -9 669.80 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 12 14 05 11 6.9 -9 669.80 -56.7 -56.9 -56.8 63 -99 SPO 1997 04 12 14 06 12 6.9 -9 669.80 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 14 07 12 6.7 -9 669.80 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 14 08 12 6.5 -9 669.80 -56.7 -57.0 -56.8 63 -99 SPO 1997 04 12 14 09 11 6.3 -9 669.80 -56.8 -57.0 -56.8 64 -99 SPO 1997 04 12 14 10 13 7.1 -9 669.80 -56.8 -57.0 -56.8 64 -99 SPO 1997 04 12 14 11 13 6.7 -9 669.80 -56.8 -57.0 -56.8 64 -99 SPO 1997 04 12 14 12 14 6.6 -9 669.80 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 12 14 13 14 6.9 -9 669.80 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 12 14 14 12 7.1 -9 669.80 -56.7 -57.0 -56.8 64 -99 SPO 1997 04 12 14 15 15 6.9 -9 669.80 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 12 14 16 15 7.0 -9 669.80 -56.7 -56.9 -56.9 63 -99 SPO 1997 04 12 14 17 11 6.7 -9 669.90 -56.8 -56.9 -56.9 63 -99 SPO 1997 04 12 14 18 11 6.4 -9 669.90 -56.8 -56.9 -56.9 63 -99 SPO 1997 04 12 14 19 14 6.1 -9 669.90 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 20 11 6.7 -9 669.80 -56.8 -56.9 -56.9 62 -99 SPO 1997 04 12 14 21 13 6.9 -9 669.90 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 22 13 7.3 -9 669.90 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 23 15 6.7 -9 669.80 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 24 13 6.8 -9 669.80 -56.8 -57.1 -57.0 64 -99 SPO 1997 04 12 14 25 12 7.0 -9 669.80 -56.8 -57.1 -57.0 64 -99 SPO 1997 04 12 14 26 15 7.5 -9 669.80 -56.8 -57.1 -57.0 64 -99 SPO 1997 04 12 14 27 13 7.0 -9 669.80 -56.8 -57.1 -56.9 63 -99 SPO 1997 04 12 14 28 14 7.0 -9 669.80 -56.8 -57.1 -57.0 63 -99 SPO 1997 04 12 14 29 13 7.0 -9 669.80 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 30 15 7.2 -9 669.80 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 31 15 7.6 -9 669.80 -56.8 -57.0 -56.9 61 -99 SPO 1997 04 12 14 32 15 7.4 -9 669.80 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 33 16 7.7 -9 669.80 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 34 15 7.2 -9 669.80 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 35 15 7.4 -9 669.80 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 14 36 14 7.0 -9 669.80 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 14 37 14 6.9 -9 669.80 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 38 14 7.2 -9 669.80 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 39 11 6.7 -9 669.90 -56.8 -57.1 -56.9 62 -99 SPO 1997 04 12 14 40 12 6.7 -9 669.90 -56.8 -57.1 -56.9 62 -99 SPO 1997 04 12 14 41 12 7.2 -9 669.80 -56.7 -57.1 -56.9 61 -99 SPO 1997 04 12 14 42 12 7.3 -9 669.90 -56.8 -57.1 -56.9 62 -99 SPO 1997 04 12 14 43 12 7.3 -9 669.90 -56.7 -57.1 -56.9 61 -99 SPO 1997 04 12 14 44 12 7.0 -9 669.90 -56.7 -57.1 -56.9 61 -99 SPO 1997 04 12 14 45 13 6.8 -9 669.90 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 46 13 7.1 -9 669.90 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 47 14 7.4 -9 669.90 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 14 48 13 7.3 -9 669.90 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 14 49 14 6.5 -9 669.90 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 12 14 50 13 7.5 -9 669.90 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 12 14 51 13 7.2 -9 669.90 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 52 13 7.1 -9 669.90 -56.8 -57.0 -56.9 62 -99 SPO 1997 04 12 14 53 11 7.0 -9 669.90 -56.8 -57.0 -56.9 61 -99 SPO 1997 04 12 14 54 10 7.6 -9 669.90 -56.8 -57.0 -56.9 61 -99 SPO 1997 04 12 14 55 12 7.4 -9 669.90 -56.8 -57.1 -57.0 62 -99 SPO 1997 04 12 14 56 12 6.9 -9 669.90 -56.8 -57.1 -57.0 62 -99 SPO 1997 04 12 14 57 10 7.2 -9 669.90 -56.8 -57.1 -57.0 62 -99 SPO 1997 04 12 14 58 10 6.8 -9 669.90 -56.8 -57.1 -57.0 63 -99 SPO 1997 04 12 14 59 11 7.0 -9 669.90 -56.9 -57.1 -57.0 63 -99 SPO 1997 04 12 15 00 11 7.1 -9 669.90 -56.8 -57.2 -57.0 62 0 SPO 1997 04 12 15 01 13 7.2 -9 669.90 -56.9 -57.1 -57.1 63 -99 SPO 1997 04 12 15 02 13 7.4 -9 669.90 -56.9 -57.1 -57.1 62 -99 SPO 1997 04 12 15 03 13 7.3 -9 669.90 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 12 15 04 12 6.5 -9 669.90 -57.0 -57.2 -57.2 62 -99 SPO 1997 04 12 15 05 12 7.1 -9 669.90 -57.0 -57.2 -57.2 61 -99 SPO 1997 04 12 15 06 11 6.8 -9 669.90 -57.0 -57.2 -57.2 61 -99 SPO 1997 04 12 15 07 12 6.9 -9 669.90 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 12 15 08 11 6.8 -9 669.90 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 12 15 09 13 6.8 -9 669.90 -57.1 -57.2 -57.3 63 -99 SPO 1997 04 12 15 10 12 6.6 -9 669.90 -57.1 -57.2 -57.3 62 -99 SPO 1997 04 12 15 11 12 6.8 -9 669.90 -57.2 -57.3 -57.3 63 -99 SPO 1997 04 12 15 12 12 7.0 -9 669.90 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 12 15 13 11 7.0 -9 669.90 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 12 15 14 11 6.8 -9 669.90 -57.2 -57.4 -57.4 62 -99 SPO 1997 04 12 15 15 13 7.0 -9 669.90 -57.2 -57.4 -57.4 61 -99 SPO 1997 04 12 15 16 11 6.6 -9 669.90 -57.3 -57.4 -57.4 62 -99 SPO 1997 04 12 15 17 10 6.4 -9 669.90 -57.3 -57.4 -57.4 62 -99 SPO 1997 04 12 15 18 11 6.5 -9 669.90 -57.3 -57.4 -57.5 62 -99 SPO 1997 04 12 15 19 13 6.9 -9 669.90 -57.3 -57.4 -57.5 62 -99 SPO 1997 04 12 15 20 12 6.6 -9 669.90 -57.3 -57.4 -57.5 62 -99 SPO 1997 04 12 15 21 14 6.7 -9 669.90 -57.3 -57.4 -57.5 62 -99 SPO 1997 04 12 15 22 13 6.7 -9 669.90 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 12 15 23 13 6.7 -9 669.90 -57.4 -57.4 -57.5 62 -99 SPO 1997 04 12 15 24 14 7.0 -9 669.90 -57.4 -57.4 -57.5 61 -99 SPO 1997 04 12 15 25 14 7.0 -9 669.90 -57.4 -57.4 -57.5 60 -99 SPO 1997 04 12 15 26 15 6.8 -9 669.90 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 27 15 7.0 -9 669.80 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 28 13 7.0 -9 669.90 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 15 29 13 6.9 -9 669.90 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 15 30 13 7.1 -9 669.90 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 15 31 13 7.2 -9 669.90 -57.5 -57.6 -57.5 63 -99 SPO 1997 04 12 15 32 14 7.3 -9 669.90 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 15 33 13 7.0 -9 669.90 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 15 34 12 6.9 -9 669.90 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 15 35 10 7.2 -9 670.00 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 15 36 12 6.8 -9 670.00 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 15 37 12 7.2 -9 670.00 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 15 38 10 7.5 -9 670.00 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 39 11 6.8 -9 670.00 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 40 11 6.9 -9 670.00 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 41 12 6.7 -9 670.00 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 42 12 7.0 -9 670.00 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 43 12 7.0 -9 670.00 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 15 44 11 6.8 -9 670.00 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 15 45 10 6.9 -9 670.00 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 15 46 12 6.8 -9 670.00 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 15 47 11 6.9 -9 670.00 -57.4 -57.6 -57.6 61 -99 SPO 1997 04 12 15 48 11 6.8 -9 670.00 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 15 49 12 6.8 -9 670.00 -57.4 -57.6 -57.6 60 -99 SPO 1997 04 12 15 50 13 7.2 -9 670.00 -57.4 -57.6 -57.6 60 -99 SPO 1997 04 12 15 51 14 7.1 -9 670.00 -57.4 -57.6 -57.5 60 -99 SPO 1997 04 12 15 52 13 6.8 -9 670.00 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 15 53 13 7.1 -9 670.00 -57.4 -57.6 -57.6 61 -99 SPO 1997 04 12 15 54 12 6.6 -9 670.00 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 15 55 12 7.0 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 15 56 12 6.8 -9 670.10 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 15 57 12 7.0 -9 670.10 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 15 58 11 6.7 -9 670.10 -57.4 -57.5 -57.5 60 -99 SPO 1997 04 12 15 59 12 6.7 -9 670.10 -57.4 -57.6 -57.5 60 -99 SPO 1997 04 12 16 00 10 7.0 -9 670.20 -57.4 -57.6 -57.5 60 0 SPO 1997 04 12 16 01 12 6.8 -9 670.10 -57.4 -57.6 -57.5 60 -99 SPO 1997 04 12 16 02 11 7.2 -9 670.10 -57.4 -57.6 -57.5 60 -99 SPO 1997 04 12 16 03 12 7.4 -9 670.10 -57.4 -57.6 -57.5 61 -99 SPO 1997 04 12 16 04 11 7.4 -9 670.10 -57.4 -57.5 -57.4 61 -99 SPO 1997 04 12 16 05 10 7.2 -9 670.10 -57.3 -57.5 -57.5 61 -99 SPO 1997 04 12 16 06 13 7.4 -9 670.10 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 07 14 7.5 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 08 13 7.9 -9 670.00 -57.3 -57.5 -57.5 62 -99 SPO 1997 04 12 16 09 14 7.8 -9 670.00 -57.3 -57.5 -57.5 61 -99 SPO 1997 04 12 16 10 15 7.7 -9 670.00 -57.3 -57.5 -57.5 61 -99 SPO 1997 04 12 16 11 14 8.0 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 12 13 8.0 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 13 13 8.1 -9 670.00 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 16 14 13 8.2 -9 670.00 -57.3 -57.5 -57.4 60 -99 SPO 1997 04 12 16 15 13 8.2 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 16 14 8.0 -9 670.00 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 16 17 15 8.5 -9 670.00 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 16 18 14 7.6 -9 670.00 -57.4 -57.6 -57.5 63 -99 SPO 1997 04 12 16 19 14 8.0 -9 670.00 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 12 16 20 14 8.3 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 21 14 7.4 -9 670.00 -57.4 -57.6 -57.5 62 -99 SPO 1997 04 12 16 22 13 7.5 -9 670.00 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 23 11 6.9 -9 670.10 -57.4 -57.5 -57.6 61 -99 SPO 1997 04 12 16 24 10 7.0 -9 670.20 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 16 25 11 7.1 -9 670.20 -57.4 -57.5 -57.5 61 -99 SPO 1997 04 12 16 26 9 7.0 -9 670.20 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 27 9 6.6 -9 670.20 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 28 9 7.1 -9 670.20 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 12 16 29 8 6.7 -9 670.30 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 12 16 30 7 6.6 -9 670.30 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 16 31 7 6.5 -9 670.30 -57.4 -57.6 -57.6 62 -99 SPO 1997 04 12 16 32 7 6.7 -9 670.30 -57.5 -57.7 -57.6 63 -99 SPO 1997 04 12 16 33 6 7.0 -9 670.30 -57.4 -57.7 -57.6 61 -99 SPO 1997 04 12 16 34 7 7.0 -9 670.20 -57.4 -57.7 -57.6 61 -99 SPO 1997 04 12 16 35 6 6.8 -9 670.20 -57.5 -57.7 -57.6 62 -99 SPO 1997 04 12 16 36 5 7.3 -9 670.20 -57.5 -57.6 -57.6 62 -99 SPO 1997 04 12 16 37 4 7.4 -9 670.20 -57.5 -57.6 -57.6 63 -99 SPO 1997 04 12 16 38 4 6.8 -9 670.30 -57.5 -57.7 -57.6 63 -99 SPO 1997 04 12 16 39 5 7.0 -9 670.20 -57.5 -57.7 -57.6 63 -99 SPO 1997 04 12 16 40 7 6.8 -9 670.20 -57.5 -57.7 -57.6 63 -99 SPO 1997 04 12 16 41 6 7.0 -9 670.20 -57.5 -57.7 -57.7 63 -99 SPO 1997 04 12 16 42 7 7.0 -9 670.30 -57.5 -57.7 -57.7 63 -99 SPO 1997 04 12 16 43 7 7.0 -9 670.30 -57.5 -57.7 -57.7 62 -99 SPO 1997 04 12 16 44 8 7.0 -9 670.20 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 12 16 45 8 7.5 -9 670.20 -57.6 -57.7 -57.7 60 -99 SPO 1997 04 12 16 46 8 7.1 -9 670.20 -57.6 -57.7 -57.7 59 -99 SPO 1997 04 12 16 47 8 6.8 -9 670.30 -57.6 -57.8 -57.7 59 -99 SPO 1997 04 12 16 48 8 7.5 -9 670.30 -57.6 -57.8 -57.7 60 -99 SPO 1997 04 12 16 49 8 6.8 -9 670.30 -57.6 -57.8 -57.7 60 -99 SPO 1997 04 12 16 50 7 6.9 -9 670.30 -57.6 -57.8 -57.8 60 -99 SPO 1997 04 12 16 51 6 6.7 -9 670.30 -57.7 -57.8 -57.8 61 -99 SPO 1997 04 12 16 52 5 6.8 -9 670.40 -57.7 -57.8 -57.8 61 -99 SPO 1997 04 12 16 53 5 6.5 -9 670.40 -57.7 -57.8 -57.9 61 -99 SPO 1997 04 12 16 54 1 6.8 -9 670.40 -57.7 -57.8 -57.9 60 -99 SPO 1997 04 12 16 55 2 5.9 -9 670.50 -57.8 -57.9 -57.9 61 -99 SPO 1997 04 12 16 56 2 5.9 -9 670.50 -57.8 -57.9 -58.0 60 -99 SPO 1997 04 12 16 57 3 6.2 -9 670.50 -57.8 -57.9 -58.0 59 -99 SPO 1997 04 12 16 58 3 6.5 -9 670.50 -57.8 -57.9 -58.0 59 -99 SPO 1997 04 12 16 59 5 6.3 -9 670.50 -57.9 -57.9 -58.0 60 -99 SPO 1997 04 12 17 00 5 6.0 -9 670.50 -57.9 -57.9 -58.1 60 0 SPO 1997 04 12 17 01 6 6.0 -9 670.50 -57.9 -57.9 -58.1 60 -99 SPO 1997 04 12 17 02 4 6.1 -9 670.60 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 12 17 03 4 5.8 -9 670.60 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 12 17 04 4 5.6 -9 670.60 -58.0 -58.1 -58.2 60 -99 SPO 1997 04 12 17 05 5 5.6 -9 670.60 -58.1 -58.1 -58.2 60 -99 SPO 1997 04 12 17 06 5 5.7 -9 670.60 -58.1 -58.1 -58.2 60 -99 SPO 1997 04 12 17 07 7 6.0 -9 670.60 -58.1 -58.1 -58.2 59 -99 SPO 1997 04 12 17 08 7 6.0 -9 670.60 -58.1 -58.1 -58.2 59 -99 SPO 1997 04 12 17 09 7 5.8 -9 670.60 -58.2 -58.1 -58.3 59 -99 SPO 1997 04 12 17 10 6 5.5 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 11 6 5.5 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 12 6 5.9 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 13 7 6.0 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 14 6 6.2 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 15 7 6.3 -9 670.60 -58.2 -58.1 -58.3 59 -99 SPO 1997 04 12 17 16 7 6.2 -9 670.60 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 12 17 17 8 6.0 -9 670.60 -58.3 -58.2 -58.4 59 -99 SPO 1997 04 12 17 18 9 5.7 -9 670.60 -58.3 -58.2 -58.4 59 -99 SPO 1997 04 12 17 19 12 5.7 -9 670.70 -58.3 -58.3 -58.4 59 -99 SPO 1997 04 12 17 20 11 5.5 -9 670.70 -58.4 -58.3 -58.4 60 -99 SPO 1997 04 12 17 21 11 5.3 -9 670.70 -58.4 -58.3 -58.5 60 -99 SPO 1997 04 12 17 22 10 5.8 -9 670.70 -58.4 -58.3 -58.6 60 -99 SPO 1997 04 12 17 23 10 5.6 -9 670.70 -58.5 -58.4 -58.5 61 -99 SPO 1997 04 12 17 24 11 5.8 -9 670.70 -58.5 -58.4 -58.6 61 -99 SPO 1997 04 12 17 25 11 5.7 -9 670.70 -58.5 -58.4 -58.6 60 -99 SPO 1997 04 12 17 26 13 5.7 -9 670.70 -58.5 -58.4 -58.7 60 -99 SPO 1997 04 12 17 27 12 6.0 -9 670.70 -58.6 -58.4 -58.6 60 -99 SPO 1997 04 12 17 28 13 5.8 -9 670.70 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 12 17 29 12 6.2 -9 670.70 -58.6 -58.4 -58.6 59 -99 SPO 1997 04 12 17 30 12 6.0 -9 670.70 -58.6 -58.4 -58.6 60 -99 SPO 1997 04 12 17 31 10 5.9 -9 670.70 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 12 17 32 9 6.1 -9 670.70 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 12 17 33 8 5.9 -9 670.70 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 12 17 34 9 5.7 -9 670.70 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 12 17 35 8 5.8 -9 670.70 -58.7 -58.5 -58.8 60 -99 SPO 1997 04 12 17 36 7 5.7 -9 670.70 -58.7 -58.5 -58.8 60 -99 SPO 1997 04 12 17 37 8 5.8 -9 670.80 -58.7 -58.5 -58.8 60 -99 SPO 1997 04 12 17 38 8 5.7 -9 670.80 -58.7 -58.5 -58.8 59 -99 SPO 1997 04 12 17 39 10 5.7 -9 670.80 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 40 12 5.8 -9 670.70 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 41 12 6.0 -9 670.70 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 42 11 6.2 -9 670.70 -58.8 -58.5 -58.9 58 -99 SPO 1997 04 12 17 43 12 6.4 -9 670.70 -58.8 -58.5 -58.9 58 -99 SPO 1997 04 12 17 44 11 6.6 -9 670.70 -58.8 -58.5 -58.9 58 -99 SPO 1997 04 12 17 45 10 6.6 -9 670.70 -58.8 -58.5 -58.9 58 -99 SPO 1997 04 12 17 46 10 6.7 -9 670.70 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 47 10 6.5 -9 670.70 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 48 10 6.6 -9 670.80 -58.8 -58.5 -58.9 59 -99 SPO 1997 04 12 17 49 9 6.5 -9 670.80 -58.8 -58.6 -58.9 59 -99 SPO 1997 04 12 17 50 9 6.5 -9 670.80 -58.8 -58.6 -59.0 58 -99 SPO 1997 04 12 17 51 10 6.5 -9 670.80 -58.9 -58.6 -59.0 59 -99 SPO 1997 04 12 17 52 9 6.3 -9 670.80 -58.9 -58.7 -59.0 58 -99 SPO 1997 04 12 17 53 9 6.3 -9 670.80 -58.9 -58.7 -59.1 58 -99 SPO 1997 04 12 17 54 9 6.7 -9 670.80 -59.0 -58.7 -59.1 58 -99 SPO 1997 04 12 17 55 9 6.5 -9 670.80 -59.0 -58.7 -59.1 58 -99 SPO 1997 04 12 17 56 9 6.6 -9 670.70 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 12 17 57 10 6.5 -9 670.70 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 12 17 58 8 6.5 -9 670.70 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 12 17 59 8 6.7 -9 670.70 -59.0 -58.7 -59.2 58 -99 SPO 1997 04 12 18 00 7 6.8 -9 670.70 -59.1 -58.7 -59.2 59 0 SPO 1997 04 12 18 01 8 6.7 -9 670.80 -59.1 -58.7 -59.1 59 -99 SPO 1997 04 12 18 02 8 6.6 -9 670.80 -59.1 -58.7 -59.2 58 -99 SPO 1997 04 12 18 03 8 6.7 -9 670.80 -59.1 -58.7 -59.2 58 -99 SPO 1997 04 12 18 04 8 6.5 -9 670.80 -59.1 -58.7 -59.2 58 -99 SPO 1997 04 12 18 05 7 6.8 -9 670.80 -59.1 -58.7 -59.2 57 -99 SPO 1997 04 12 18 06 7 6.7 -9 670.80 -59.1 -58.8 -59.2 57 -99 SPO 1997 04 12 18 07 6 6.6 -9 670.90 -59.2 -58.8 -59.2 59 -99 SPO 1997 04 12 18 08 7 6.3 -9 670.90 -59.2 -58.8 -59.2 59 -99 SPO 1997 04 12 18 09 8 6.3 -9 670.90 -59.2 -58.9 -59.3 60 -99 SPO 1997 04 12 18 10 7 6.0 -9 670.90 -59.2 -58.9 -59.4 59 -99 SPO 1997 04 12 18 11 8 6.2 -9 670.90 -59.3 -58.9 -59.3 60 -99 SPO 1997 04 12 18 12 8 6.2 -9 670.90 -59.3 -58.9 -59.3 59 -99 SPO 1997 04 12 18 13 9 6.2 -9 670.90 -59.3 -58.9 -59.4 59 -99 SPO 1997 04 12 18 14 9 6.0 -9 671.00 -59.3 -58.9 -59.4 58 -99 SPO 1997 04 12 18 15 7 5.8 -9 671.00 -59.3 -58.9 -59.4 58 -99 SPO 1997 04 12 18 16 9 5.6 -9 671.00 -59.3 -58.9 -59.4 57 -99 SPO 1997 04 12 18 17 9 5.8 -9 671.00 -59.4 -58.9 -59.4 58 -99 SPO 1997 04 12 18 18 10 5.9 -9 671.00 -59.4 -58.9 -59.5 58 -99 SPO 1997 04 12 18 19 10 6.0 -9 671.00 -59.4 -58.9 -59.5 58 -99 SPO 1997 04 12 18 20 10 5.9 -9 671.00 -59.4 -58.9 -59.5 58 -99 SPO 1997 04 12 18 21 10 5.6 -9 671.00 -59.4 -59.0 -59.5 58 -99 SPO 1997 04 12 18 22 11 5.7 -9 671.00 -59.4 -59.0 -59.6 58 -99 SPO 1997 04 12 18 23 10 5.7 -9 671.00 -59.5 -59.1 -59.6 59 -99 SPO 1997 04 12 18 24 10 5.7 -9 671.00 -59.5 -59.1 -59.6 59 -99 SPO 1997 04 12 18 25 11 5.5 -9 671.00 -59.5 -59.1 -59.6 59 -99 SPO 1997 04 12 18 26 10 5.7 -9 671.00 -59.5 -59.1 -59.6 58 -99 SPO 1997 04 12 18 27 11 5.5 -9 671.00 -59.5 -59.1 -59.6 57 -99 SPO 1997 04 12 18 28 10 5.6 -9 671.00 -59.6 -59.2 -59.7 58 -99 SPO 1997 04 12 18 29 12 5.3 -9 671.00 -59.6 -59.2 -59.7 58 -99 SPO 1997 04 12 18 30 12 5.4 -9 671.00 -59.6 -59.1 -59.7 58 -99 SPO 1997 04 12 18 31 13 5.2 -9 671.00 -59.6 -59.2 -59.7 58 -99 SPO 1997 04 12 18 32 15 5.4 -9 671.00 -59.6 -59.2 -59.8 58 -99 SPO 1997 04 12 18 33 16 5.4 -9 671.00 -59.6 -59.2 -59.7 59 -99 SPO 1997 04 12 18 34 16 5.0 -9 671.00 -59.7 -59.2 -59.7 59 -99 SPO 1997 04 12 18 35 17 5.0 -9 671.00 -59.7 -59.2 -59.8 59 -99 SPO 1997 04 12 18 36 19 5.0 -9 671.00 -59.7 -59.2 -59.8 58 -99 SPO 1997 04 12 18 37 20 4.5 -9 671.10 -59.7 -59.3 -59.8 57 -99 SPO 1997 04 12 18 38 21 4.8 -9 671.10 -59.8 -59.4 -59.9 57 -99 SPO 1997 04 12 18 39 22 4.6 -9 671.10 -59.8 -59.4 -59.8 57 -99 SPO 1997 04 12 18 40 22 4.5 -9 671.10 -59.8 -59.4 -59.8 57 -99 SPO 1997 04 12 18 41 22 4.6 -9 671.10 -59.8 -59.4 -59.9 58 -99 SPO 1997 04 12 18 42 23 4.7 -9 671.10 -59.8 -59.4 -59.9 58 -99 SPO 1997 04 12 18 43 24 5.0 -9 671.10 -59.9 -59.4 -59.9 59 -99 SPO 1997 04 12 18 44 24 4.9 -9 671.10 -59.8 -59.4 -59.9 58 -99 SPO 1997 04 12 18 45 22 5.0 -9 671.10 -59.9 -59.4 -60.0 59 -99 SPO 1997 04 12 18 46 22 5.1 -9 671.10 -59.9 -59.4 -59.9 59 -99 SPO 1997 04 12 18 47 21 5.2 -9 671.10 -59.9 -59.4 -60.0 58 -99 SPO 1997 04 12 18 48 22 5.3 -9 671.10 -59.9 -59.4 -60.0 58 -99 SPO 1997 04 12 18 49 23 5.4 -9 671.10 -59.9 -59.4 -60.0 58 -99 SPO 1997 04 12 18 50 22 5.6 -9 671.10 -59.9 -59.3 -60.0 57 -99 SPO 1997 04 12 18 51 21 5.2 -9 671.10 -59.9 -59.3 -60.0 57 -99 SPO 1997 04 12 18 52 19 5.5 -9 671.10 -59.9 -59.4 -60.0 57 -99 SPO 1997 04 12 18 53 19 5.5 -9 671.10 -59.9 -59.4 -60.0 57 -99 SPO 1997 04 12 18 54 20 5.4 -9 671.10 -60.0 -59.4 -60.1 59 -99 SPO 1997 04 12 18 55 20 5.4 -9 671.10 -60.0 -59.5 -60.1 59 -99 SPO 1997 04 12 18 56 20 5.4 -9 671.10 -60.0 -59.5 -60.1 59 -99 SPO 1997 04 12 18 57 20 5.3 -9 671.10 -60.0 -59.5 -60.1 59 -99 SPO 1997 04 12 18 58 21 5.3 -9 671.10 -60.0 -59.5 -60.1 58 -99 SPO 1997 04 12 18 59 21 5.5 -9 671.10 -60.1 -59.5 -60.2 59 -99 SPO 1997 04 12 19 00 21 5.5 -9 671.10 -60.1 -59.5 -60.1 58 0 SPO 1997 04 12 19 01 20 5.6 -9 671.20 -60.1 -59.4 -60.2 57 -99 SPO 1997 04 12 19 02 19 5.3 -9 671.20 -60.1 -59.5 -60.1 57 -99 SPO 1997 04 12 19 03 19 5.5 -9 671.20 -60.1 -59.4 -60.2 58 -99 SPO 1997 04 12 19 04 21 5.3 -9 671.20 -60.1 -59.5 -60.2 58 -99 SPO 1997 04 12 19 05 20 5.4 -9 671.20 -60.1 -59.5 -60.2 58 -99 SPO 1997 04 12 19 06 18 5.5 -9 671.20 -60.1 -59.5 -60.2 59 -99 SPO 1997 04 12 19 07 20 5.6 -9 671.10 -60.1 -59.5 -60.2 58 -99 SPO 1997 04 12 19 08 21 5.5 -9 671.10 -60.1 -59.5 -60.2 57 -99 SPO 1997 04 12 19 09 21 5.6 -9 671.10 -60.2 -59.5 -60.3 58 -99 SPO 1997 04 12 19 10 22 5.5 -9 671.10 -60.2 -59.6 -60.3 58 -99 SPO 1997 04 12 19 11 21 5.6 -9 671.10 -60.2 -59.6 -60.3 57 -99 SPO 1997 04 12 19 12 21 5.9 -9 671.10 -60.2 -59.6 -60.3 57 -99 SPO 1997 04 12 19 13 21 6.0 -9 671.10 -60.3 -59.6 -60.3 58 -99 SPO 1997 04 12 19 14 21 6.0 -9 671.10 -60.3 -59.6 -60.3 58 -99 SPO 1997 04 12 19 15 20 6.2 -9 671.10 -60.3 -59.6 -60.4 58 -99 SPO 1997 04 12 19 16 20 5.9 -9 671.10 -60.3 -59.6 -60.4 59 -99 SPO 1997 04 12 19 17 19 6.1 -9 671.20 -60.3 -59.6 -60.4 58 -99 SPO 1997 04 12 19 18 20 5.9 -9 671.20 -60.3 -59.6 -60.4 58 -99 SPO 1997 04 12 19 19 20 6.0 -9 671.20 -60.3 -59.6 -60.4 59 -99 SPO 1997 04 12 19 20 19 5.9 -9 671.20 -60.3 -59.6 -60.4 58 -99 SPO 1997 04 12 19 21 19 6.0 -9 671.20 -60.3 -59.6 -60.4 58 -99 SPO 1997 04 12 19 22 18 5.7 -9 671.20 -60.3 -59.6 -60.4 57 -99 SPO 1997 04 12 19 23 19 5.8 -9 671.20 -60.3 -59.7 -60.4 57 -99 SPO 1997 04 12 19 24 18 5.8 -9 671.20 -60.3 -59.8 -60.4 57 -99 SPO 1997 04 12 19 25 18 5.8 -9 671.30 -60.4 -59.8 -60.4 57 -99 SPO 1997 04 12 19 26 18 5.5 -9 671.30 -60.4 -59.8 -60.5 58 -99 SPO 1997 04 12 19 27 19 5.8 -9 671.30 -60.4 -59.8 -60.5 59 -99 SPO 1997 04 12 19 28 18 5.5 -9 671.30 -60.4 -59.9 -60.5 58 -99 SPO 1997 04 12 19 29 18 5.8 -9 671.30 -60.4 -59.9 -60.5 58 -99 SPO 1997 04 12 19 30 17 5.7 -9 671.30 -60.4 -59.9 -60.5 58 -99 SPO 1997 04 12 19 31 18 5.6 -9 671.30 -60.4 -59.9 -60.5 58 -99 SPO 1997 04 12 19 32 18 5.7 -9 671.30 -60.4 -59.9 -60.5 58 -99 SPO 1997 04 12 19 33 17 5.9 -9 671.30 -60.4 -59.9 -60.5 57 -99 SPO 1997 04 12 19 34 17 5.8 -9 671.30 -60.5 -59.9 -60.5 58 -99 SPO 1997 04 12 19 35 18 5.8 -9 671.30 -60.5 -59.9 -60.6 57 -99 SPO 1997 04 12 19 36 17 6.1 -9 671.30 -60.5 -59.9 -60.6 57 -99 SPO 1997 04 12 19 37 17 6.0 -9 671.30 -60.5 -59.9 -60.6 57 -99 SPO 1997 04 12 19 38 18 6.2 -9 671.30 -60.5 -59.9 -60.6 57 -99 SPO 1997 04 12 19 39 17 6.2 -9 671.30 -60.5 -60.0 -60.6 57 -99 SPO 1997 04 12 19 40 16 6.4 -9 671.40 -60.5 -60.0 -60.6 58 -99 SPO 1997 04 12 19 41 15 6.3 -9 671.40 -60.5 -60.0 -60.6 59 -99 SPO 1997 04 12 19 42 16 6.5 -9 671.40 -60.5 -60.0 -60.6 59 -99 SPO 1997 04 12 19 43 16 6.1 -9 671.40 -60.5 -60.0 -60.6 58 -99 SPO 1997 04 12 19 44 16 6.4 -9 671.40 -60.6 -60.1 -60.6 59 -99 SPO 1997 04 12 19 45 15 6.4 -9 671.40 -60.6 -60.1 -60.6 58 -99 SPO 1997 04 12 19 46 15 6.5 -9 671.40 -60.6 -60.1 -60.7 57 -99 SPO 1997 04 12 19 47 16 6.5 -9 671.40 -60.6 -60.0 -60.6 57 -99 SPO 1997 04 12 19 48 16 6.6 -9 671.30 -60.6 -60.0 -60.6 58 -99 SPO 1997 04 12 19 49 17 6.2 -9 671.30 -60.6 -60.0 -60.7 58 -99 SPO 1997 04 12 19 50 17 6.2 -9 671.30 -60.6 -60.1 -60.7 58 -99 SPO 1997 04 12 19 51 18 6.0 -9 671.40 -60.6 -60.1 -60.7 58 -99 SPO 1997 04 12 19 52 17 6.1 -9 671.40 -60.6 -60.1 -60.7 58 -99 SPO 1997 04 12 19 53 16 6.2 -9 671.40 -60.6 -60.1 -60.7 57 -99 SPO 1997 04 12 19 54 17 6.1 -9 671.40 -60.6 -60.2 -60.7 56 -99 SPO 1997 04 12 19 55 16 6.2 -9 671.40 -60.7 -60.2 -60.7 56 -99 SPO 1997 04 12 19 56 16 6.3 -9 671.40 -60.7 -60.2 -60.7 57 -99 SPO 1997 04 12 19 57 14 6.8 -9 671.40 -60.7 -60.2 -60.7 57 -99 SPO 1997 04 12 19 58 15 6.7 -9 671.40 -60.7 -60.2 -60.7 58 -99 SPO 1997 04 12 19 59 14 6.8 -9 671.40 -60.7 -60.1 -60.7 58 -99 SPO 1997 04 12 20 00 15 6.6 -9 671.40 -60.7 -60.1 -60.7 59 0 SPO 1997 04 12 20 01 16 6.5 -9 671.40 -60.7 -60.2 -60.8 59 -99 SPO 1997 04 12 20 02 16 6.9 -9 671.40 -60.7 -60.1 -60.7 59 -99 SPO 1997 04 12 20 03 16 6.7 -9 671.40 -60.7 -60.1 -60.8 59 -99 SPO 1997 04 12 20 04 16 6.7 -9 671.40 -60.6 -60.1 -60.7 59 -99 SPO 1997 04 12 20 05 16 6.6 -9 671.40 -60.7 -60.1 -60.8 59 -99 SPO 1997 04 12 20 06 17 6.7 -9 671.40 -60.7 -60.1 -60.8 59 -99 SPO 1997 04 12 20 07 16 6.8 -9 671.40 -60.7 -60.1 -60.8 58 -99 SPO 1997 04 12 20 08 17 6.8 -9 671.40 -60.7 -60.1 -60.8 57 -99 SPO 1997 04 12 20 09 18 6.7 -9 671.40 -60.7 -60.1 -60.8 56 -99 SPO 1997 04 12 20 10 19 6.5 -9 671.50 -60.7 -60.2 -60.8 57 -99 SPO 1997 04 12 20 11 19 6.7 -9 671.40 -60.7 -60.2 -60.8 57 -99 SPO 1997 04 12 20 12 19 6.3 -9 671.40 -60.7 -60.3 -60.8 57 -99 SPO 1997 04 12 20 13 20 6.5 -9 671.40 -60.8 -60.3 -60.9 58 -99 SPO 1997 04 12 20 14 20 6.6 -9 671.40 -60.8 -60.3 -60.8 59 -99 SPO 1997 04 12 20 15 19 6.5 -9 671.40 -60.8 -60.3 -60.8 59 -99 SPO 1997 04 12 20 16 20 6.7 -9 671.40 -60.8 -60.3 -60.8 59 -99 SPO 1997 04 12 20 17 20 6.4 -9 671.40 -60.8 -60.3 -60.9 59 -99 SPO 1997 04 12 20 18 21 6.1 -9 671.40 -60.8 -60.3 -60.9 58 -99 SPO 1997 04 12 20 19 21 6.4 -9 671.40 -60.8 -60.3 -60.9 57 -99 SPO 1997 04 12 20 20 20 6.2 -9 671.40 -60.8 -60.3 -60.9 57 -99 SPO 1997 04 12 20 21 20 6.3 -9 671.40 -60.8 -60.3 -60.9 57 -99 SPO 1997 04 12 20 22 21 6.3 -9 671.40 -60.9 -60.3 -60.9 58 -99 SPO 1997 04 12 20 23 22 6.3 -9 671.40 -60.9 -60.3 -61.0 58 -99 SPO 1997 04 12 20 24 23 6.1 -9 671.40 -60.9 -60.4 -61.0 58 -99 SPO 1997 04 12 20 25 24 6.2 -9 671.40 -60.9 -60.4 -61.0 57 -99 SPO 1997 04 12 20 26 24 6.2 -9 671.50 -60.9 -60.4 -61.0 57 -99 SPO 1997 04 12 20 27 24 6.6 -9 671.50 -60.9 -60.4 -61.0 57 -99 SPO 1997 04 12 20 28 24 6.4 -9 671.50 -60.9 -60.4 -61.0 57 -99 SPO 1997 04 12 20 29 25 6.4 -9 671.50 -60.9 -60.4 -61.0 56 -99 SPO 1997 04 12 20 30 23 6.3 -9 671.50 -61.0 -60.5 -61.0 57 -99 SPO 1997 04 12 20 31 23 6.3 -9 671.50 -61.0 -60.5 -61.1 57 -99 SPO 1997 04 12 20 32 24 6.3 -9 671.50 -61.0 -60.5 -61.1 57 -99 SPO 1997 04 12 20 33 23 6.4 -9 671.50 -61.0 -60.5 -61.1 58 -99 SPO 1997 04 12 20 34 24 6.7 -9 671.50 -61.0 -60.4 -61.0 58 -99 SPO 1997 04 12 20 35 23 6.5 -9 671.50 -61.0 -60.5 -61.0 58 -99 SPO 1997 04 12 20 36 23 6.5 -9 671.50 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 12 20 37 23 6.4 -9 671.50 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 12 20 38 24 6.2 -9 671.60 -61.0 -60.5 -61.0 59 -99 SPO 1997 04 12 20 39 25 6.2 -9 671.60 -61.0 -60.5 -61.1 58 -99 SPO 1997 04 12 20 40 26 6.3 -9 671.60 -61.0 -60.5 -61.0 57 -99 SPO 1997 04 12 20 41 25 5.9 -9 671.60 -61.0 -60.6 -61.0 57 -99 SPO 1997 04 12 20 42 24 6.1 -9 671.60 -61.0 -60.6 -61.1 57 -99 SPO 1997 04 12 20 43 23 6.2 -9 671.60 -61.0 -60.6 -61.1 57 -99 SPO 1997 04 12 20 44 23 6.3 -9 671.60 -61.0 -60.6 -61.1 57 -99 SPO 1997 04 12 20 45 23 6.5 -9 671.60 -61.0 -60.6 -61.1 57 -99 SPO 1997 04 12 20 46 23 6.4 -9 671.60 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 20 47 23 6.3 -9 671.60 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 20 48 23 6.5 -9 671.70 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 20 49 22 6.6 -9 671.70 -61.1 -60.6 -61.1 59 -99 SPO 1997 04 12 20 50 22 6.5 -9 671.70 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 20 51 22 6.6 -9 671.70 -61.1 -60.6 -61.2 59 -99 SPO 1997 04 12 20 52 22 6.7 -9 671.70 -61.1 -60.6 -61.1 59 -99 SPO 1997 04 12 20 53 21 6.6 -9 671.70 -61.1 -60.6 -61.2 58 -99 SPO 1997 04 12 20 54 21 6.8 -9 671.70 -61.1 -60.6 -61.2 58 -99 SPO 1997 04 12 20 55 19 6.8 -9 671.70 -61.1 -60.6 -61.2 58 -99 SPO 1997 04 12 20 56 19 6.8 -9 671.70 -61.1 -60.6 -61.2 58 -99 SPO 1997 04 12 20 57 19 6.3 -9 671.70 -61.1 -60.7 -61.2 58 -99 SPO 1997 04 12 20 58 21 6.3 -9 671.80 -61.1 -60.8 -61.2 58 -99 SPO 1997 04 12 20 59 21 6.0 -9 671.80 -61.1 -60.8 -61.2 58 -99 SPO 1997 04 12 21 00 20 6.4 -9 671.80 -61.1 -60.8 -61.2 58 0 SPO 1997 04 12 21 01 20 6.4 -9 671.80 -61.1 -60.8 -61.2 58 -99 SPO 1997 04 12 21 02 21 6.5 -9 671.80 -61.2 -60.7 -61.2 58 -99 SPO 1997 04 12 21 03 22 6.3 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 04 21 6.4 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 05 23 6.2 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 06 22 6.0 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 07 21 6.3 -9 671.80 -61.2 -60.7 -61.3 59 -99 SPO 1997 04 12 21 08 22 6.3 -9 671.80 -61.2 -60.7 -61.2 59 -99 SPO 1997 04 12 21 09 22 6.2 -9 671.80 -61.2 -60.7 -61.3 59 -99 SPO 1997 04 12 21 10 21 6.2 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 11 21 6.2 -9 671.80 -61.2 -60.7 -61.3 58 -99 SPO 1997 04 12 21 12 20 6.5 -9 671.80 -61.2 -60.8 -61.3 57 -99 SPO 1997 04 12 21 13 19 6.6 -9 671.80 -61.2 -60.8 -61.3 58 -99 SPO 1997 04 12 21 14 19 6.8 -9 671.80 -61.2 -60.8 -61.3 58 -99 SPO 1997 04 12 21 15 19 6.7 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 16 19 6.8 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 17 19 6.6 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 18 18 6.9 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 19 18 6.6 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 20 19 6.5 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 21 20 6.1 -9 671.80 -61.2 -60.8 -61.4 59 -99 SPO 1997 04 12 21 22 21 6.2 -9 671.80 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 21 23 21 6.5 -9 671.80 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 21 24 21 6.1 -9 671.80 -61.2 -60.9 -61.4 58 -99 SPO 1997 04 12 21 25 19 6.6 -9 671.80 -61.2 -60.8 -61.4 57 -99 SPO 1997 04 12 21 26 18 6.6 -9 671.80 -61.3 -60.9 -61.4 57 -99 SPO 1997 04 12 21 27 18 6.8 -9 671.80 -61.3 -60.9 -61.4 57 -99 SPO 1997 04 12 21 28 17 7.1 -9 671.80 -61.3 -60.9 -61.4 58 -99 SPO 1997 04 12 21 29 17 7.0 -9 671.80 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 21 30 17 7.6 -9 671.80 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 21 31 17 7.6 -9 671.80 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 21 32 17 7.6 -9 671.70 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 21 33 18 7.6 -9 671.70 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 21 34 19 7.4 -9 671.70 -61.3 -60.8 -61.4 58 -99 SPO 1997 04 12 21 35 20 7.5 -9 671.70 -61.3 -60.8 -61.4 58 -99 SPO 1997 04 12 21 36 20 7.5 -9 671.70 -61.3 -60.8 -61.4 58 -99 SPO 1997 04 12 21 37 20 7.6 -9 671.70 -61.3 -60.8 -61.4 57 -99 SPO 1997 04 12 21 38 20 7.7 -9 671.70 -61.3 -60.8 -61.4 58 -99 SPO 1997 04 12 21 39 20 7.6 -9 671.70 -61.3 -60.7 -61.4 58 -99 SPO 1997 04 12 21 40 20 8.0 -9 671.70 -61.2 -60.7 -61.3 57 -99 SPO 1997 04 12 21 41 19 7.8 -9 671.70 -61.2 -60.7 -61.3 57 -99 SPO 1997 04 12 21 42 18 7.7 -9 671.70 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 21 43 18 8.1 -9 671.70 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 21 44 18 7.8 -9 671.70 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 45 18 7.7 -9 671.70 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 21 46 18 7.9 -9 671.70 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 21 47 18 7.5 -9 671.70 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 21 48 19 7.5 -9 671.80 -61.2 -60.8 -61.3 58 -99 SPO 1997 04 12 21 49 20 7.4 -9 671.80 -61.2 -60.8 -61.3 58 -99 SPO 1997 04 12 21 50 20 7.6 -9 671.80 -61.2 -60.8 -61.2 58 -99 SPO 1997 04 12 21 51 20 7.2 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 52 21 7.4 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 53 20 7.5 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 54 21 7.5 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 55 22 7.2 -9 671.80 -61.2 -60.7 -61.3 59 -99 SPO 1997 04 12 21 56 22 7.4 -9 671.80 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 21 57 22 7.4 -9 671.90 -61.2 -60.8 -61.3 58 -99 SPO 1997 04 12 21 58 22 7.3 -9 671.90 -61.2 -60.8 -61.2 59 -99 SPO 1997 04 12 21 59 22 7.4 -9 671.90 -61.2 -60.9 -61.3 58 -99 SPO 1997 04 12 22 00 23 7.2 -9 671.90 -61.2 -60.9 -61.3 58 0 SPO 1997 04 12 22 01 24 7.0 -9 671.90 -61.2 -60.9 -61.3 57 -99 SPO 1997 04 12 22 02 23 7.1 -9 671.90 -61.2 -60.9 -61.3 57 -99 SPO 1997 04 12 22 03 24 6.8 -9 671.90 -61.2 -60.9 -61.4 58 -99 SPO 1997 04 12 22 04 24 7.0 -9 671.90 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 22 05 23 7.4 -9 672.00 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 22 06 22 7.4 -9 671.90 -61.3 -60.8 -61.4 59 -99 SPO 1997 04 12 22 07 22 7.6 -9 671.90 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 22 08 22 7.5 -9 671.90 -61.3 -60.8 -61.3 58 -99 SPO 1997 04 12 22 09 23 7.4 -9 671.90 -61.2 -60.8 -61.4 57 -99 SPO 1997 04 12 22 10 23 7.4 -9 671.90 -61.3 -60.8 -61.4 57 -99 SPO 1997 04 12 22 11 24 7.5 -9 671.90 -61.3 -60.8 -61.5 57 -99 SPO 1997 04 12 22 12 25 7.6 -9 671.90 -61.4 -60.9 -61.5 58 -99 SPO 1997 04 12 22 13 25 7.5 -9 671.90 -61.4 -60.9 -61.4 58 -99 SPO 1997 04 12 22 14 25 7.4 -9 671.90 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 15 24 7.7 -9 671.90 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 16 24 7.6 -9 671.90 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 17 23 7.3 -9 672.00 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 18 24 7.4 -9 672.00 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 19 24 7.2 -9 672.00 -61.4 -61.0 -61.6 58 -99 SPO 1997 04 12 22 20 24 7.4 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 21 24 7.4 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 22 24 7.4 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 23 24 7.8 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 24 24 7.7 -9 672.00 -61.4 -61.0 -61.5 57 -99 SPO 1997 04 12 22 25 23 7.7 -9 672.00 -61.4 -61.0 -61.6 58 -99 SPO 1997 04 12 22 26 23 7.7 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 27 23 7.6 -9 672.00 -61.5 -61.0 -61.6 58 -99 SPO 1997 04 12 22 28 23 7.6 -9 672.00 -61.5 -61.1 -61.6 58 -99 SPO 1997 04 12 22 29 23 7.6 -9 672.00 -61.5 -61.1 -61.6 59 -99 SPO 1997 04 12 22 30 23 7.6 -9 672.00 -61.5 -61.1 -61.5 58 -99 SPO 1997 04 12 22 31 24 7.7 -9 672.00 -61.5 -61.1 -61.5 58 -99 SPO 1997 04 12 22 32 24 7.8 -9 672.00 -61.5 -61.1 -61.5 58 -99 SPO 1997 04 12 22 33 24 8.0 -9 672.00 -61.5 -61.0 -61.5 58 -99 SPO 1997 04 12 22 34 24 8.0 -9 672.00 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 35 24 8.0 -9 672.00 -61.4 -61.0 -61.5 58 -99 SPO 1997 04 12 22 36 24 8.0 -9 672.00 -61.4 -61.0 -61.4 58 -99 SPO 1997 04 12 22 37 23 7.8 -9 672.00 -61.4 -61.0 -61.4 59 -99 SPO 1997 04 12 22 38 24 8.1 -9 672.00 -61.4 -60.9 -61.4 59 -99 SPO 1997 04 12 22 39 25 8.3 -9 671.90 -61.4 -60.9 -61.4 60 -99 SPO 1997 04 12 22 40 24 8.3 -9 671.90 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 22 41 24 8.3 -9 671.90 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 22 42 23 8.2 -9 672.00 -61.3 -60.9 -61.4 58 -99 SPO 1997 04 12 22 43 23 8.1 -9 672.00 -61.3 -60.9 -61.4 58 -99 SPO 1997 04 12 22 44 23 7.8 -9 672.00 -61.3 -61.0 -61.4 58 -99 SPO 1997 04 12 22 45 23 8.0 -9 672.00 -61.3 -61.0 -61.4 58 -99 SPO 1997 04 12 22 46 24 7.9 -9 672.00 -61.3 -61.0 -61.4 58 -99 SPO 1997 04 12 22 47 24 7.8 -9 672.00 -61.3 -61.0 -61.4 59 -99 SPO 1997 04 12 22 48 24 7.7 -9 672.00 -61.3 -61.0 -61.4 59 -99 SPO 1997 04 12 22 49 23 7.8 -9 672.00 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 22 50 23 7.8 -9 672.00 -61.3 -60.9 -61.4 59 -99 SPO 1997 04 12 22 51 22 7.8 -9 672.00 -61.3 -60.9 -61.3 60 -99 SPO 1997 04 12 22 52 23 7.6 -9 672.00 -61.3 -60.9 -61.3 59 -99 SPO 1997 04 12 22 53 22 7.8 -9 672.00 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 22 54 23 7.8 -9 671.90 -61.3 -60.8 -61.3 59 -99 SPO 1997 04 12 22 55 23 7.9 -9 671.90 -61.2 -60.8 -61.3 59 -99 SPO 1997 04 12 22 56 22 8.1 -9 671.90 -61.1 -60.8 -61.2 57 -99 SPO 1997 04 12 22 57 21 8.0 -9 671.90 -61.2 -60.8 -61.2 58 -99 SPO 1997 04 12 22 58 21 8.2 -9 671.90 -61.1 -60.8 -61.2 58 -99 SPO 1997 04 12 22 59 20 8.2 -9 671.90 -61.1 -60.8 -61.2 59 -99 SPO 1997 04 12 23 00 20 8.5 -9 671.90 -61.1 -60.8 -61.2 59 0 SPO 1997 04 12 23 01 19 8.4 -9 671.90 -61.1 -60.7 -61.1 59 -99 SPO 1997 04 12 23 02 19 8.5 -9 671.90 -61.1 -60.7 -61.1 60 -99 SPO 1997 04 12 23 03 20 8.6 -9 671.90 -61.1 -60.7 -61.1 59 -99 SPO 1997 04 12 23 04 19 8.5 -9 671.90 -61.0 -60.7 -61.1 58 -99 SPO 1997 04 12 23 05 19 8.4 -9 671.90 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 23 06 19 8.5 -9 671.90 -61.0 -60.6 -61.1 58 -99 SPO 1997 04 12 23 07 20 8.3 -9 672.00 -61.0 -60.6 -61.1 57 -99 SPO 1997 04 12 23 08 19 8.6 -9 672.00 -61.0 -60.6 -61.0 57 -99 SPO 1997 04 12 23 09 20 8.5 -9 672.00 -61.0 -60.5 -61.0 58 -99 SPO 1997 04 12 23 10 20 8.7 -9 672.00 -61.0 -60.5 -61.0 59 -99 SPO 1997 04 12 23 11 20 8.5 -9 672.00 -60.9 -60.5 -60.9 59 -99 SPO 1997 04 12 23 12 19 8.7 -9 672.00 -60.9 -60.5 -60.9 60 -99 SPO 1997 04 12 23 13 18 8.6 -9 672.00 -60.9 -60.5 -60.9 60 -99 SPO 1997 04 12 23 14 18 8.8 -9 671.90 -60.8 -60.6 -60.9 59 -99 SPO 1997 04 12 23 15 19 8.8 -9 671.90 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 12 23 16 17 9.0 -9 671.90 -60.8 -60.5 -60.8 59 -99 SPO 1997 04 12 23 17 17 8.7 -9 672.00 -60.8 -60.5 -60.9 58 -99 SPO 1997 04 12 23 18 17 8.9 -9 672.00 -60.8 -60.5 -60.9 58 -99 SPO 1997 04 12 23 19 17 8.6 -9 672.00 -60.8 -60.5 -60.9 58 -99 SPO 1997 04 12 23 20 17 8.6 -9 672.00 -60.8 -60.5 -60.9 58 -99 SPO 1997 04 12 23 21 17 8.5 -9 672.00 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 12 23 22 17 8.4 -9 672.00 -60.8 -60.4 -60.8 60 -99 SPO 1997 04 12 23 23 17 8.2 -9 672.00 -60.8 -60.4 -60.8 61 -99 SPO 1997 04 12 23 24 17 8.3 -9 672.00 -60.8 -60.4 -60.8 60 -99 SPO 1997 04 12 23 25 17 8.4 -9 672.00 -60.8 -60.4 -60.8 60 -99 SPO 1997 04 12 23 26 17 8.4 -9 672.00 -60.8 -60.4 -60.8 60 -99 SPO 1997 04 12 23 27 18 8.2 -9 672.00 -60.7 -60.4 -60.8 59 -99 SPO 1997 04 12 23 28 18 8.3 -9 672.10 -60.7 -60.4 -60.7 58 -99 SPO 1997 04 12 23 29 19 8.3 -9 672.10 -60.7 -60.5 -60.7 59 -99 SPO 1997 04 12 23 30 20 7.8 -9 672.10 -60.7 -60.5 -60.8 58 -99 SPO 1997 04 12 23 31 21 8.0 -9 672.20 -60.7 -60.5 -60.8 58 -99 SPO 1997 04 12 23 32 21 7.7 -9 672.20 -60.7 -60.5 -60.8 58 -99 SPO 1997 04 12 23 33 21 7.7 -9 672.20 -60.7 -60.5 -60.8 59 -99 SPO 1997 04 12 23 34 22 7.5 -9 672.20 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 12 23 35 23 7.7 -9 672.20 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 12 23 36 23 7.8 -9 672.20 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 12 23 37 23 7.6 -9 672.20 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 12 23 38 23 7.8 -9 672.20 -60.7 -60.4 -60.8 59 -99 SPO 1997 04 12 23 39 24 7.7 -9 672.20 -60.7 -60.4 -60.7 59 -99 SPO 1997 04 12 23 40 24 7.6 -9 672.20 -60.7 -60.4 -60.8 59 -99 SPO 1997 04 12 23 41 24 7.4 -9 672.20 -60.7 -60.4 -60.7 59 -99 SPO 1997 04 12 23 42 24 7.4 -9 672.20 -60.7 -60.4 -60.7 59 -99 SPO 1997 04 12 23 43 23 7.6 -9 672.20 -60.7 -60.4 -60.7 58 -99 SPO 1997 04 12 23 44 23 7.6 -9 672.20 -60.7 -60.4 -60.7 59 -99 SPO 1997 04 12 23 45 22 7.5 -9 672.20 -60.6 -60.4 -60.6 59 -99 SPO 1997 04 12 23 46 22 8.0 -9 672.30 -60.6 -60.4 -60.6 60 -99 SPO 1997 04 12 23 47 22 7.7 -9 672.20 -60.6 -60.4 -60.6 60 -99 SPO 1997 04 12 23 48 22 7.6 -9 672.30 -60.6 -60.4 -60.6 61 -99 SPO 1997 04 12 23 49 23 7.4 -9 672.30 -60.6 -60.4 -60.6 61 -99 SPO 1997 04 12 23 50 24 7.4 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 51 23 7.6 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 52 22 7.7 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 53 23 7.9 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 54 22 7.9 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 55 23 7.6 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 12 23 56 23 7.6 -9 672.20 -60.5 -60.4 -60.6 60 -99 SPO 1997 04 12 23 57 23 7.5 -9 672.20 -60.5 -60.4 -60.6 60 -99 SPO 1997 04 12 23 58 24 7.5 -9 672.20 -60.5 -60.4 -60.6 -99 -99 SPO 1997 04 12 23 59 24 7.4 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 00 24 7.5 -9 672.20 -60.5 -60.5 -60.6 -99 0 SPO 1997 04 13 00 01 24 7.4 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 02 24 7.4 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 03 23 7.6 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 04 24 7.5 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 05 24 7.7 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 06 25 7.6 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 07 24 7.4 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 08 25 7.2 -9 672.20 -60.5 -60.5 -60.6 -99 -99 SPO 1997 04 13 00 09 25 7.6 -9 672.20 -60.5 -60.4 -60.5 -99 -99 SPO 1997 04 13 00 10 26 7.4 -9 672.20 -60.5 -60.4 -60.5 -99 -99 SPO 1997 04 13 00 11 26 7.2 -9 672.20 -60.5 -60.4 -60.6 -99 -99 SPO 1997 04 13 00 12 26 7.6 -9 672.20 -60.5 -60.4 -60.5 -99 -99 SPO 1997 04 13 00 13 26 7.2 -9 672.20 -60.5 -60.4 -60.6 59 -99 SPO 1997 04 13 00 14 27 7.5 -9 672.30 -60.5 -60.5 -60.6 59 -99 SPO 1997 04 13 00 15 27 7.3 -9 672.30 -60.5 -60.5 -60.6 59 -99 SPO 1997 04 13 00 16 28 7.1 -9 672.30 -60.5 -60.5 -60.6 59 -99 SPO 1997 04 13 00 17 27 7.1 -9 672.20 -60.5 -60.5 -60.6 59 -99 SPO 1997 04 13 00 18 27 7.5 -9 672.30 -60.5 -60.5 -60.6 59 -99 SPO 1997 04 13 00 19 28 7.2 -9 672.30 -60.5 -60.5 -60.6 60 -99 SPO 1997 04 13 00 20 28 7.2 -9 672.30 -60.5 -60.5 -60.6 61 -99 SPO 1997 04 13 00 21 28 6.8 -9 672.30 -60.5 -60.5 -60.6 62 -99 SPO 1997 04 13 00 22 28 6.8 -9 672.30 -60.5 -60.5 -60.7 62 -99 SPO 1997 04 13 00 23 29 7.0 -9 672.30 -60.5 -60.5 -60.6 62 -99 SPO 1997 04 13 00 24 27 6.8 -9 672.30 -60.5 -60.5 -60.7 62 -99 SPO 1997 04 13 00 25 28 7.0 -9 672.20 -60.5 -60.5 -60.6 61 -99 SPO 1997 04 13 00 26 29 6.8 -9 672.20 -60.6 -60.5 -60.7 62 -99 SPO 1997 04 13 00 27 29 6.9 -9 672.30 -60.6 -60.5 -60.7 60 -99 SPO 1997 04 13 00 28 28 7.0 -9 672.30 -60.6 -60.5 -60.6 59 -99 SPO 1997 04 13 00 29 28 7.0 -9 672.30 -60.6 -60.5 -60.6 59 -99 SPO 1997 04 13 00 30 28 7.0 -9 672.30 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 13 00 31 26 7.0 -9 672.30 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 13 00 32 26 6.8 -9 672.30 -60.6 -60.7 -60.7 60 -99 SPO 1997 04 13 00 33 27 6.9 -9 672.30 -60.6 -60.7 -60.8 61 -99 SPO 1997 04 13 00 34 27 6.7 -9 672.30 -60.7 -60.7 -60.8 62 -99 SPO 1997 04 13 00 35 27 7.1 -9 672.30 -60.7 -60.7 -60.8 62 -99 SPO 1997 04 13 00 36 26 7.0 -9 672.30 -60.6 -60.7 -60.7 60 -99 SPO 1997 04 13 00 37 26 6.7 -9 672.30 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 00 38 27 6.9 -9 672.30 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 00 39 27 6.9 -9 672.30 -60.7 -60.8 -60.8 59 -99 SPO 1997 04 13 00 40 27 7.0 -9 672.30 -60.7 -60.8 -60.8 59 -99 SPO 1997 04 13 00 41 26 7.2 -9 672.30 -60.7 -60.8 -60.8 59 -99 SPO 1997 04 13 00 42 26 7.5 -9 672.30 -60.7 -60.8 -60.8 59 -99 SPO 1997 04 13 00 43 26 7.5 -9 672.30 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 00 44 25 7.5 -9 672.30 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 00 45 25 7.8 -9 672.20 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 00 46 25 7.5 -9 672.20 -60.7 -60.8 -60.8 60 -99 SPO 1997 04 13 00 47 25 7.1 -9 672.20 -60.7 -60.8 -60.8 61 -99 SPO 1997 04 13 00 48 24 7.7 -9 672.20 -60.8 -60.8 -60.9 60 -99 SPO 1997 04 13 00 49 24 7.5 -9 672.20 -60.8 -60.8 -60.8 60 -99 SPO 1997 04 13 00 50 23 7.6 -9 672.20 -60.8 -60.8 -60.8 59 -99 SPO 1997 04 13 00 51 22 8.0 -9 672.20 -60.8 -60.8 -60.8 59 -99 SPO 1997 04 13 00 52 21 8.0 -9 672.20 -60.8 -60.7 -60.9 60 -99 SPO 1997 04 13 00 53 22 7.9 -9 672.20 -60.8 -60.7 -60.8 60 -99 SPO 1997 04 13 00 54 22 7.8 -9 672.20 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 00 55 22 7.9 -9 672.20 -60.8 -60.7 -60.8 61 -99 SPO 1997 04 13 00 56 21 8.2 -9 672.20 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 00 57 21 7.7 -9 672.20 -60.8 -60.7 -60.8 62 -99 SPO 1997 04 13 00 58 20 8.0 -9 672.20 -60.8 -60.7 -60.8 62 -99 SPO 1997 04 13 00 59 20 7.9 -9 672.20 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 01 00 20 7.6 -9 672.20 -60.8 -60.7 -60.9 61 0 SPO 1997 04 13 01 01 20 7.5 -9 672.20 -60.8 -60.7 -60.9 60 -99 SPO 1997 04 13 01 02 20 7.6 -9 672.30 -60.8 -60.8 -60.9 60 -99 SPO 1997 04 13 01 03 19 8.0 -9 672.30 -60.8 -60.8 -60.9 59 -99 SPO 1997 04 13 01 04 20 7.9 -9 672.30 -60.8 -60.8 -60.9 59 -99 SPO 1997 04 13 01 05 19 7.8 -9 672.30 -60.8 -60.8 -60.9 59 -99 SPO 1997 04 13 01 06 20 7.8 -9 672.30 -60.8 -60.7 -60.9 60 -99 SPO 1997 04 13 01 07 20 7.8 -9 672.30 -60.8 -60.7 -60.9 60 -99 SPO 1997 04 13 01 08 19 7.9 -9 672.30 -60.8 -60.7 -61.0 60 -99 SPO 1997 04 13 01 09 19 8.1 -9 672.30 -60.9 -60.7 -61.0 61 -99 SPO 1997 04 13 01 10 20 8.0 -9 672.30 -60.8 -60.7 -61.0 60 -99 SPO 1997 04 13 01 11 21 8.0 -9 672.30 -60.8 -60.7 -61.0 60 -99 SPO 1997 04 13 01 12 21 8.0 -9 672.30 -60.9 -60.7 -61.0 59 -99 SPO 1997 04 13 01 13 22 7.5 -9 672.30 -60.9 -60.7 -60.9 59 -99 SPO 1997 04 13 01 14 21 7.7 -9 672.30 -60.9 -60.7 -61.0 58 -99 SPO 1997 04 13 01 15 22 7.7 -9 672.30 -60.9 -60.7 -61.0 58 -99 SPO 1997 04 13 01 16 22 7.7 -9 672.40 -60.9 -60.8 -61.0 58 -99 SPO 1997 04 13 01 17 23 7.5 -9 672.40 -60.9 -60.8 -61.0 58 -99 SPO 1997 04 13 01 18 23 7.3 -9 672.30 -60.9 -60.8 -61.0 58 -99 SPO 1997 04 13 01 19 24 7.2 -9 672.40 -60.9 -60.8 -61.0 59 -99 SPO 1997 04 13 01 20 25 7.1 -9 672.40 -60.9 -60.9 -61.0 59 -99 SPO 1997 04 13 01 21 25 7.3 -9 672.40 -61.0 -60.9 -61.0 59 -99 SPO 1997 04 13 01 22 25 7.2 -9 672.40 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 23 24 7.2 -9 672.40 -61.0 -60.9 -61.0 59 -99 SPO 1997 04 13 01 24 24 7.0 -9 672.40 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 25 23 7.3 -9 672.50 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 26 22 7.4 -9 672.50 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 27 23 7.1 -9 672.40 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 28 24 7.1 -9 672.40 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 29 24 7.3 -9 672.40 -61.0 -60.9 -61.1 59 -99 SPO 1997 04 13 01 30 24 7.1 -9 672.50 -61.0 -60.8 -61.0 59 -99 SPO 1997 04 13 01 31 24 7.2 -9 672.40 -61.0 -60.9 -61.0 59 -99 SPO 1997 04 13 01 32 24 7.3 -9 672.40 -61.0 -60.9 -61.0 59 -99 SPO 1997 04 13 01 33 23 7.4 -9 672.40 -61.0 -60.9 -61.0 59 -99 SPO 1997 04 13 01 34 23 7.3 -9 672.40 -60.9 -60.9 -61.0 58 -99 SPO 1997 04 13 01 35 23 7.4 -9 672.40 -60.9 -60.9 -61.0 58 -99 SPO 1997 04 13 01 36 24 7.5 -9 672.40 -60.9 -60.9 -61.0 57 -99 SPO 1997 04 13 01 37 23 7.3 -9 672.40 -60.9 -60.8 -61.0 58 -99 SPO 1997 04 13 01 38 22 7.4 -9 672.40 -60.9 -60.8 -61.0 58 -99 SPO 1997 04 13 01 39 21 7.5 -9 672.40 -60.9 -60.8 -60.9 58 -99 SPO 1997 04 13 01 40 22 8.0 -9 672.40 -60.8 -60.8 -60.9 58 -99 SPO 1997 04 13 01 41 21 7.9 -9 672.40 -60.8 -60.7 -60.8 59 -99 SPO 1997 04 13 01 42 21 7.6 -9 672.40 -60.8 -60.7 -60.8 59 -99 SPO 1997 04 13 01 43 21 7.9 -9 672.40 -60.8 -60.7 -60.8 59 -99 SPO 1997 04 13 01 44 21 7.9 -9 672.40 -60.8 -60.6 -60.8 59 -99 SPO 1997 04 13 01 45 21 8.0 -9 672.40 -60.7 -60.6 -60.8 59 -99 SPO 1997 04 13 01 46 21 8.0 -9 672.40 -60.7 -60.7 -60.8 58 -99 SPO 1997 04 13 01 47 22 7.7 -9 672.40 -60.7 -60.7 -60.8 58 -99 SPO 1997 04 13 01 48 23 7.7 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 49 23 8.0 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 50 25 7.8 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 51 26 8.1 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 52 26 7.8 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 53 27 7.7 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 54 28 7.6 -9 672.40 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 01 55 28 7.4 -9 672.40 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 01 56 28 7.5 -9 672.40 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 01 57 28 7.4 -9 672.40 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 01 58 29 7.7 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 01 59 29 7.5 -9 672.40 -60.7 -60.7 -60.8 59 -99 SPO 1997 04 13 02 00 29 7.6 -9 672.40 -60.7 -60.7 -60.8 59 0 SPO 1997 04 13 02 01 29 7.5 -9 672.40 -60.7 -60.6 -60.7 59 -99 SPO 1997 04 13 02 02 29 7.2 -9 672.50 -60.6 -60.6 -60.7 59 -99 SPO 1997 04 13 02 03 29 7.4 -9 672.50 -60.7 -60.7 -60.7 59 -99 SPO 1997 04 13 02 04 30 7.2 -9 672.40 -60.7 -60.8 -60.8 60 -99 SPO 1997 04 13 02 05 29 7.3 -9 672.50 -60.7 -60.8 -60.7 60 -99 SPO 1997 04 13 02 06 30 7.5 -9 672.50 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 02 07 28 7.2 -9 672.50 -60.7 -60.7 -60.7 60 -99 SPO 1997 04 13 02 08 29 7.6 -9 672.50 -60.7 -60.7 -60.7 61 -99 SPO 1997 04 13 02 09 29 7.1 -9 672.50 -60.6 -60.7 -60.7 60 -99 SPO 1997 04 13 02 10 29 7.1 -9 672.50 -60.6 -60.7 -60.7 60 -99 SPO 1997 04 13 02 11 29 7.1 -9 672.50 -60.6 -60.7 -60.8 61 -99 SPO 1997 04 13 02 12 29 7.6 -9 672.50 -60.6 -60.7 -60.8 60 -99 SPO 1997 04 13 02 13 30 7.5 -9 672.50 -60.7 -60.7 -60.7 61 -99 SPO 1997 04 13 02 14 29 7.7 -9 672.50 -60.7 -60.7 -60.7 61 -99 SPO 1997 04 13 02 15 28 7.3 -9 672.50 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 02 16 29 7.4 -9 672.50 -60.7 -60.7 -60.8 62 -99 SPO 1997 04 13 02 17 27 7.7 -9 672.50 -60.6 -60.7 -60.7 61 -99 SPO 1997 04 13 02 18 28 7.5 -9 672.50 -60.6 -60.7 -60.7 62 -99 SPO 1997 04 13 02 19 28 7.7 -9 672.50 -60.6 -60.8 -60.7 62 -99 SPO 1997 04 13 02 20 27 7.5 -9 672.60 -60.6 -60.8 -60.7 62 -99 SPO 1997 04 13 02 21 28 7.7 -9 672.60 -60.6 -60.8 -60.7 62 -99 SPO 1997 04 13 02 22 28 7.3 -9 672.60 -60.7 -60.8 -60.8 62 -99 SPO 1997 04 13 02 23 28 7.2 -9 672.50 -60.7 -60.8 -60.8 62 -99 SPO 1997 04 13 02 24 28 6.9 -9 672.60 -60.7 -60.8 -60.8 61 -99 SPO 1997 04 13 02 25 27 7.5 -9 672.50 -60.7 -60.8 -60.8 60 -99 SPO 1997 04 13 02 26 27 7.4 -9 672.60 -60.7 -60.8 -60.8 59 -99 SPO 1997 04 13 02 27 27 7.5 -9 672.50 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 02 28 25 7.6 -9 672.50 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 02 29 25 7.2 -9 672.50 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 02 30 25 7.2 -9 672.50 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 02 31 23 7.8 -9 672.50 -60.7 -60.7 -60.8 61 -99 SPO 1997 04 13 02 32 23 8.2 -9 672.50 -60.7 -60.7 -60.8 60 -99 SPO 1997 04 13 02 33 23 8.2 -9 672.40 -60.7 -60.7 -60.7 59 -99 SPO 1997 04 13 02 34 22 8.0 -9 672.40 -60.7 -60.7 -60.7 59 -99 SPO 1997 04 13 02 35 21 7.8 -9 672.40 -60.7 -60.7 -60.7 59 -99 SPO 1997 04 13 02 36 22 7.9 -9 672.40 -60.7 -60.7 -60.7 59 -99 SPO 1997 04 13 02 37 22 8.2 -9 672.40 -60.6 -60.7 -60.7 59 -99 SPO 1997 04 13 02 38 23 7.7 -9 672.40 -60.6 -60.6 -60.7 59 -99 SPO 1997 04 13 02 39 24 7.8 -9 672.40 -60.6 -60.6 -60.6 60 -99 SPO 1997 04 13 02 40 24 7.1 -9 672.40 -60.6 -60.6 -60.6 61 -99 SPO 1997 04 13 02 41 24 7.3 -9 672.40 -60.5 -60.6 -60.6 61 -99 SPO 1997 04 13 02 42 23 7.7 -9 672.40 -60.5 -60.5 -60.6 61 -99 SPO 1997 04 13 02 43 21 8.4 -9 672.40 -60.5 -60.5 -60.5 62 -99 SPO 1997 04 13 02 44 20 8.4 -9 672.30 -60.4 -60.4 -60.5 61 -99 SPO 1997 04 13 02 45 19 8.9 -9 672.30 -60.4 -60.3 -60.4 61 -99 SPO 1997 04 13 02 46 19 8.8 -9 672.30 -60.4 -60.3 -60.4 61 -99 SPO 1997 04 13 02 47 18 9.1 -9 672.30 -60.3 -60.2 -60.3 60 -99 SPO 1997 04 13 02 48 18 8.8 -9 672.30 -60.3 -60.2 -60.3 60 -99 SPO 1997 04 13 02 49 20 8.4 -9 672.20 -60.2 -60.2 -60.3 58 -99 SPO 1997 04 13 02 50 20 8.8 -9 672.30 -60.2 -60.2 -60.3 59 -99 SPO 1997 04 13 02 51 20 8.8 -9 672.30 -60.2 -60.2 -60.2 60 -99 SPO 1997 04 13 02 52 19 8.6 -9 672.30 -60.2 -60.2 -60.2 62 -99 SPO 1997 04 13 02 53 20 8.8 -9 672.30 -60.1 -60.2 -60.2 62 -99 SPO 1997 04 13 02 54 20 8.5 -9 672.30 -60.1 -60.2 -60.2 62 -99 SPO 1997 04 13 02 55 19 8.5 -9 672.30 -60.1 -60.2 -60.2 63 -99 SPO 1997 04 13 02 56 20 8.6 -9 672.30 -60.1 -60.2 -60.2 62 -99 SPO 1997 04 13 02 57 21 8.3 -9 672.30 -60.1 -60.2 -60.2 62 -99 SPO 1997 04 13 02 58 20 8.2 -9 672.30 -60.1 -60.2 -60.2 62 -99 SPO 1997 04 13 02 59 22 8.5 -9 672.30 -60.1 -60.2 -60.2 61 -99 SPO 1997 04 13 03 00 21 9.0 -9 672.30 -60.1 -60.1 -60.2 61 0 SPO 1997 04 13 03 01 20 8.6 -9 672.30 -60.1 -60.1 -60.2 60 -99 SPO 1997 04 13 03 02 20 8.7 -9 672.20 -60.1 -60.1 -60.2 61 -99 SPO 1997 04 13 03 03 20 8.9 -9 672.20 -60.1 -60.1 -60.2 62 -99 SPO 1997 04 13 03 04 22 8.5 -9 672.20 -60.1 -60.1 -60.2 62 -99 SPO 1997 04 13 03 05 21 8.9 -9 672.20 -60.1 -60.1 -60.2 63 -99 SPO 1997 04 13 03 06 21 8.7 -9 672.20 -60.1 -60.2 -60.2 63 -99 SPO 1997 04 13 03 07 21 8.9 -9 672.20 -60.1 -60.2 -60.2 63 -99 SPO 1997 04 13 03 08 22 8.7 -9 672.20 -60.1 -60.2 -60.2 63 -99 SPO 1997 04 13 03 09 22 9.0 -9 672.20 -60.1 -60.2 -60.2 61 -99 SPO 1997 04 13 03 10 23 8.7 -9 672.20 -60.1 -60.2 -60.2 61 -99 SPO 1997 04 13 03 11 23 8.3 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 12 22 8.3 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 13 23 8.2 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 14 24 8.2 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 15 23 8.2 -9 672.20 -60.2 -60.2 -60.3 61 -99 SPO 1997 04 13 03 16 22 8.5 -9 672.20 -60.2 -60.2 -60.3 61 -99 SPO 1997 04 13 03 17 22 8.6 -9 672.20 -60.2 -60.2 -60.4 61 -99 SPO 1997 04 13 03 18 21 8.6 -9 672.20 -60.2 -60.2 -60.3 61 -99 SPO 1997 04 13 03 19 22 8.7 -9 672.20 -60.2 -60.2 -60.3 61 -99 SPO 1997 04 13 03 20 22 8.6 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 21 22 8.3 -9 672.20 -60.2 -60.2 -60.3 60 -99 SPO 1997 04 13 03 22 21 8.5 -9 672.20 -60.2 -60.3 -60.4 60 -99 SPO 1997 04 13 03 23 20 8.3 -9 672.20 -60.3 -60.3 -60.4 60 -99 SPO 1997 04 13 03 24 20 8.3 -9 672.20 -60.3 -60.3 -60.4 60 -99 SPO 1997 04 13 03 25 21 8.6 -9 672.20 -60.3 -60.3 -60.4 60 -99 SPO 1997 04 13 03 26 20 8.0 -9 672.20 -60.3 -60.3 -60.4 61 -99 SPO 1997 04 13 03 27 20 7.9 -9 672.20 -60.3 -60.3 -60.4 61 -99 SPO 1997 04 13 03 28 20 8.0 -9 672.20 -60.3 -60.2 -60.4 62 -99 SPO 1997 04 13 03 29 20 7.9 -9 672.30 -60.3 -60.2 -60.3 61 -99 SPO 1997 04 13 03 30 21 8.0 -9 672.30 -60.3 -60.2 -60.3 62 -99 SPO 1997 04 13 03 31 22 8.0 -9 672.30 -60.2 -60.1 -60.3 61 -99 SPO 1997 04 13 03 32 22 8.0 -9 672.30 -60.2 -60.1 -60.3 60 -99 SPO 1997 04 13 03 33 22 7.8 -9 672.40 -60.2 -60.1 -60.2 60 -99 SPO 1997 04 13 03 34 23 7.6 -9 672.30 -60.2 -60.1 -60.2 60 -99 SPO 1997 04 13 03 35 23 7.8 -9 672.40 -60.2 -60.1 -60.2 59 -99 SPO 1997 04 13 03 36 24 7.4 -9 672.40 -60.1 -60.1 -60.2 58 -99 SPO 1997 04 13 03 37 24 7.7 -9 672.40 -60.1 -60.1 -60.2 59 -99 SPO 1997 04 13 03 38 23 8.2 -9 672.40 -60.1 -60.1 -60.2 60 -99 SPO 1997 04 13 03 39 24 8.0 -9 672.40 -60.1 -60.1 -60.2 61 -99 SPO 1997 04 13 03 40 23 7.8 -9 672.40 -60.1 -60.1 -60.2 61 -99 SPO 1997 04 13 03 41 23 7.7 -9 672.40 -60.1 -60.1 -60.2 62 -99 SPO 1997 04 13 03 42 22 8.2 -9 672.40 -60.1 -60.1 -60.2 61 -99 SPO 1997 04 13 03 43 22 8.2 -9 672.40 -60.1 -60.0 -60.1 61 -99 SPO 1997 04 13 03 44 24 7.7 -9 672.40 -60.1 -60.0 -60.1 61 -99 SPO 1997 04 13 03 45 23 8.0 -9 672.40 -60.0 -60.0 -60.1 60 -99 SPO 1997 04 13 03 46 23 7.8 -9 672.40 -60.0 -59.9 -60.1 60 -99 SPO 1997 04 13 03 47 24 7.7 -9 672.50 -60.0 -59.9 -60.0 60 -99 SPO 1997 04 13 03 48 24 7.7 -9 672.50 -60.0 -59.8 -60.0 60 -99 SPO 1997 04 13 03 49 23 7.8 -9 672.50 -59.9 -59.8 -60.0 60 -99 SPO 1997 04 13 03 50 23 7.7 -9 672.50 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 03 51 22 7.9 -9 672.40 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 03 52 22 7.7 -9 672.40 -59.9 -59.8 -59.9 61 -99 SPO 1997 04 13 03 53 21 7.8 -9 672.50 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 03 54 22 7.9 -9 672.50 -59.9 -59.8 -59.9 61 -99 SPO 1997 04 13 03 55 21 7.6 -9 672.50 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 03 56 21 7.7 -9 672.50 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 03 57 21 7.7 -9 672.50 -59.9 -59.8 -60.0 60 -99 SPO 1997 04 13 03 58 20 7.9 -9 672.50 -59.9 -59.8 -60.0 60 -99 SPO 1997 04 13 03 59 18 8.3 -9 672.40 -59.9 -59.8 -60.0 60 -99 SPO 1997 04 13 04 00 19 8.3 -9 672.40 -59.9 -59.7 -60.0 60 0 SPO 1997 04 13 04 01 18 8.7 -9 672.40 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 13 04 02 17 9.1 -9 672.40 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 13 04 03 17 9.1 -9 672.40 -59.9 -59.7 -60.0 62 -99 SPO 1997 04 13 04 04 17 8.8 -9 672.40 -59.9 -59.6 -60.0 63 -99 SPO 1997 04 13 04 05 18 9.0 -9 672.40 -59.9 -59.6 -60.0 63 -99 SPO 1997 04 13 04 06 18 8.7 -9 672.40 -59.9 -59.6 -60.0 62 -99 SPO 1997 04 13 04 07 19 8.8 -9 672.40 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 13 04 08 20 8.5 -9 672.50 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 13 04 09 21 8.4 -9 672.50 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 13 04 10 21 8.2 -9 672.50 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 13 04 11 22 8.0 -9 672.50 -59.9 -59.8 -60.0 60 -99 SPO 1997 04 13 04 12 23 7.7 -9 672.60 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 04 13 23 8.0 -9 672.60 -59.9 -59.8 -60.0 62 -99 SPO 1997 04 13 04 14 22 8.2 -9 672.60 -59.9 -59.8 -60.0 63 -99 SPO 1997 04 13 04 15 23 7.9 -9 672.60 -60.0 -59.8 -60.0 64 -99 SPO 1997 04 13 04 16 24 7.6 -9 672.60 -60.0 -59.8 -60.1 64 -99 SPO 1997 04 13 04 17 23 7.5 -9 672.60 -60.0 -59.8 -60.1 64 -99 SPO 1997 04 13 04 18 23 7.8 -9 672.50 -60.0 -59.8 -60.1 64 -99 SPO 1997 04 13 04 19 23 7.6 -9 672.60 -60.0 -59.8 -60.1 63 -99 SPO 1997 04 13 04 20 24 7.7 -9 672.60 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 13 04 21 24 7.4 -9 672.60 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 22 24 7.7 -9 672.60 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 23 25 7.2 -9 672.60 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 24 25 7.3 -9 672.60 -60.0 -59.8 -60.1 59 -99 SPO 1997 04 13 04 25 25 7.3 -9 672.60 -60.0 -59.8 -60.2 59 -99 SPO 1997 04 13 04 26 25 7.7 -9 672.60 -60.1 -59.9 -60.1 61 -99 SPO 1997 04 13 04 27 24 7.6 -9 672.60 -60.0 -59.9 -60.1 60 -99 SPO 1997 04 13 04 28 25 7.7 -9 672.60 -60.0 -59.8 -60.2 61 -99 SPO 1997 04 13 04 29 24 8.1 -9 672.50 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 13 04 30 24 7.8 -9 672.50 -60.0 -59.8 -60.1 61 -99 SPO 1997 04 13 04 31 24 8.0 -9 672.50 -60.0 -59.8 -60.1 61 -99 SPO 1997 04 13 04 32 24 8.0 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 33 23 7.8 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 34 23 7.6 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 35 23 8.1 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 36 23 8.2 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 37 22 8.1 -9 672.50 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 13 04 38 22 8.4 -9 672.50 -60.0 -59.7 -60.1 61 -99 SPO 1997 04 13 04 39 21 8.5 -9 672.40 -60.0 -59.7 -60.0 62 -99 SPO 1997 04 13 04 40 21 8.9 -9 672.40 -60.0 -59.7 -60.0 62 -99 SPO 1997 04 13 04 41 21 8.9 -9 672.40 -60.0 -59.8 -60.0 63 -99 SPO 1997 04 13 04 42 20 9.1 -9 672.40 -60.0 -59.8 -60.0 62 -99 SPO 1997 04 13 04 43 21 8.9 -9 672.40 -59.9 -59.8 -60.0 61 -99 SPO 1997 04 13 04 44 21 8.8 -9 672.40 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 13 04 45 20 8.9 -9 672.40 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 13 04 46 20 8.8 -9 672.40 -60.0 -59.8 -60.1 61 -99 SPO 1997 04 13 04 47 20 9.0 -9 672.40 -60.0 -59.8 -60.1 61 -99 SPO 1997 04 13 04 48 19 9.2 -9 672.40 -60.0 -59.7 -60.0 62 -99 SPO 1997 04 13 04 49 19 9.2 -9 672.40 -60.0 -59.7 -60.0 63 -99 SPO 1997 04 13 04 50 19 8.8 -9 672.40 -59.9 -59.7 -60.0 62 -99 SPO 1997 04 13 04 51 20 9.0 -9 672.40 -59.9 -59.7 -60.0 62 -99 SPO 1997 04 13 04 52 19 9.0 -9 672.40 -59.9 -59.7 -60.0 63 -99 SPO 1997 04 13 04 53 20 8.9 -9 672.40 -59.9 -59.7 -60.0 62 -99 SPO 1997 04 13 04 54 20 8.9 -9 672.40 -59.9 -59.7 -59.9 61 -99 SPO 1997 04 13 04 55 20 9.1 -9 672.50 -59.9 -59.7 -59.9 60 -99 SPO 1997 04 13 04 56 21 8.4 -9 672.50 -59.8 -59.7 -59.9 60 -99 SPO 1997 04 13 04 57 20 8.8 -9 672.40 -59.8 -59.7 -59.9 60 -99 SPO 1997 04 13 04 58 21 8.9 -9 672.50 -59.8 -59.7 -59.8 60 -99 SPO 1997 04 13 04 59 21 8.7 -9 672.50 -59.8 -59.7 -59.8 60 -99 SPO 1997 04 13 05 00 22 8.7 -9 672.50 -59.8 -59.7 -59.8 62 0 SPO 1997 04 13 05 01 22 8.7 -9 672.50 -59.8 -59.7 -59.8 62 -99 SPO 1997 04 13 05 02 23 8.5 -9 672.60 -59.8 -59.7 -59.8 63 -99 SPO 1997 04 13 05 03 23 8.6 -9 672.60 -59.7 -59.7 -59.8 63 -99 SPO 1997 04 13 05 04 23 8.4 -9 672.60 -59.7 -59.7 -59.8 63 -99 SPO 1997 04 13 05 05 23 8.4 -9 672.60 -59.7 -59.7 -59.8 62 -99 SPO 1997 04 13 05 06 24 8.3 -9 672.60 -59.7 -59.7 -59.8 61 -99 SPO 1997 04 13 05 07 24 8.4 -9 672.60 -59.7 -59.6 -59.8 61 -99 SPO 1997 04 13 05 08 24 8.2 -9 672.60 -59.7 -59.6 -59.7 60 -99 SPO 1997 04 13 05 09 25 8.3 -9 672.60 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 05 10 25 8.1 -9 672.60 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 05 11 25 8.2 -9 672.60 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 05 12 24 8.2 -9 672.60 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 05 13 25 8.5 -9 672.60 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 05 14 24 8.9 -9 672.60 -59.6 -59.6 -59.6 61 -99 SPO 1997 04 13 05 15 23 8.5 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 16 24 8.2 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 17 25 8.7 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 18 24 8.0 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 19 24 8.1 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 20 24 8.1 -9 672.60 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 21 25 8.0 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 22 24 8.4 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 23 25 8.0 -9 672.60 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 24 24 8.1 -9 672.60 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 25 23 8.2 -9 672.60 -59.4 -59.4 -59.5 61 -99 SPO 1997 04 13 05 26 23 8.3 -9 672.60 -59.4 -59.5 -59.6 61 -99 SPO 1997 04 13 05 27 23 8.1 -9 672.60 -59.4 -59.5 -59.6 61 -99 SPO 1997 04 13 05 28 23 7.8 -9 672.60 -59.4 -59.5 -59.6 60 -99 SPO 1997 04 13 05 29 22 8.3 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 30 22 8.0 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 31 20 8.0 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 32 22 8.2 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 33 21 7.7 -9 672.60 -59.5 -59.6 -59.7 59 -99 SPO 1997 04 13 05 34 23 8.1 -9 672.60 -59.5 -59.6 -59.7 59 -99 SPO 1997 04 13 05 35 23 7.9 -9 672.60 -59.6 -59.6 -59.6 60 -99 SPO 1997 04 13 05 36 23 7.9 -9 672.60 -59.5 -59.6 -59.7 61 -99 SPO 1997 04 13 05 37 22 7.8 -9 672.60 -59.5 -59.6 -59.7 61 -99 SPO 1997 04 13 05 38 21 8.3 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 39 22 8.5 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 40 20 8.8 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 41 20 8.2 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 42 20 8.6 -9 672.60 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 43 20 8.6 -9 672.60 -59.5 -59.5 -59.6 58 -99 SPO 1997 04 13 05 44 21 8.7 -9 672.60 -59.5 -59.5 -59.6 58 -99 SPO 1997 04 13 05 45 19 8.7 -9 672.60 -59.5 -59.5 -59.6 59 -99 SPO 1997 04 13 05 46 19 8.4 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 47 20 8.4 -9 672.60 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 05 48 20 8.4 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 49 21 8.1 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 50 21 7.8 -9 672.70 -59.5 -59.6 -59.6 62 -99 SPO 1997 04 13 05 51 20 7.9 -9 672.60 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 05 52 20 8.0 -9 672.70 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 53 19 8.1 -9 672.60 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 54 20 8.0 -9 672.70 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 55 19 8.3 -9 672.70 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 56 20 8.0 -9 672.70 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 57 20 7.9 -9 672.70 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 05 58 18 8.3 -9 672.70 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 05 59 19 8.2 -9 672.70 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 06 00 17 8.2 -9 672.70 -59.5 -59.6 -59.6 60 0 SPO 1997 04 13 06 01 17 8.1 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 02 17 8.8 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 03 16 8.1 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 04 16 8.4 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 05 16 8.4 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 06 15 8.7 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 07 15 8.6 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 08 16 8.4 -9 672.70 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 09 16 8.0 -9 672.60 -59.5 -59.6 -59.7 61 -99 SPO 1997 04 13 06 10 16 8.2 -9 672.70 -59.6 -59.6 -59.7 62 -99 SPO 1997 04 13 06 11 17 8.4 -9 672.70 -59.6 -59.6 -59.7 62 -99 SPO 1997 04 13 06 12 16 8.4 -9 672.70 -59.6 -59.6 -59.7 62 -99 SPO 1997 04 13 06 13 16 8.6 -9 672.70 -59.6 -59.6 -59.7 62 -99 SPO 1997 04 13 06 14 16 8.8 -9 672.70 -59.6 -59.6 -59.7 61 -99 SPO 1997 04 13 06 15 16 8.7 -9 672.70 -59.6 -59.6 -59.6 60 -99 SPO 1997 04 13 06 16 16 8.5 -9 672.70 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 06 17 16 8.2 -9 672.70 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 06 18 16 8.5 -9 672.70 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 19 16 8.3 -9 672.70 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 20 17 8.1 -9 672.70 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 21 16 8.0 -9 672.70 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 22 17 8.0 -9 672.70 -59.6 -59.7 -59.7 61 -99 SPO 1997 04 13 06 23 17 7.9 -9 672.70 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 24 17 7.9 -9 672.80 -59.6 -59.7 -59.8 61 -99 SPO 1997 04 13 06 25 17 8.0 -9 672.70 -59.6 -59.7 -59.7 61 -99 SPO 1997 04 13 06 26 16 7.6 -9 672.80 -59.6 -59.6 -59.8 60 -99 SPO 1997 04 13 06 27 17 7.7 -9 672.70 -59.7 -59.6 -59.8 61 -99 SPO 1997 04 13 06 28 17 8.0 -9 672.70 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 06 29 17 7.5 -9 672.80 -59.6 -59.6 -59.7 59 -99 SPO 1997 04 13 06 30 19 7.7 -9 672.80 -59.6 -59.6 -59.8 59 -99 SPO 1997 04 13 06 31 18 7.5 -9 672.80 -59.6 -59.6 -59.7 59 -99 SPO 1997 04 13 06 32 18 7.4 -9 672.80 -59.6 -59.6 -59.7 60 -99 SPO 1997 04 13 06 33 17 7.4 -9 672.90 -59.6 -59.7 -59.7 60 -99 SPO 1997 04 13 06 34 17 7.4 -9 672.90 -59.6 -59.7 -59.7 61 -99 SPO 1997 04 13 06 35 18 7.4 -9 672.90 -59.6 -59.7 -59.6 61 -99 SPO 1997 04 13 06 36 17 7.3 -9 672.90 -59.6 -59.6 -59.6 62 -99 SPO 1997 04 13 06 37 17 7.5 -9 672.90 -59.6 -59.6 -59.6 62 -99 SPO 1997 04 13 06 38 18 7.2 -9 672.90 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 39 16 7.2 -9 672.90 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 40 16 7.6 -9 672.90 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 41 15 7.5 -9 672.90 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 42 14 7.3 -9 672.90 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 06 43 14 7.1 -9 672.90 -59.4 -59.5 -59.6 61 -99 SPO 1997 04 13 06 44 15 7.4 -9 672.90 -59.4 -59.5 -59.6 61 -99 SPO 1997 04 13 06 45 14 7.5 -9 672.90 -59.4 -59.5 -59.5 61 -99 SPO 1997 04 13 06 46 14 7.8 -9 672.80 -59.4 -59.5 -59.5 62 -99 SPO 1997 04 13 06 47 14 7.9 -9 672.80 -59.4 -59.5 -59.4 62 -99 SPO 1997 04 13 06 48 15 7.4 -9 672.80 -59.4 -59.5 -59.4 62 -99 SPO 1997 04 13 06 49 15 8.0 -9 672.80 -59.4 -59.5 -59.4 63 -99 SPO 1997 04 13 06 50 14 7.8 -9 672.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 13 06 51 15 8.4 -9 672.80 -59.3 -59.5 -59.3 61 -99 SPO 1997 04 13 06 52 16 7.9 -9 672.80 -59.3 -59.4 -59.3 61 -99 SPO 1997 04 13 06 53 15 8.2 -9 672.80 -59.3 -59.4 -59.3 62 -99 SPO 1997 04 13 06 54 15 8.3 -9 672.80 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 06 55 15 7.9 -9 672.80 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 06 56 15 8.4 -9 672.80 -59.2 -59.4 -59.3 62 -99 SPO 1997 04 13 06 57 14 8.3 -9 672.80 -59.2 -59.3 -59.3 62 -99 SPO 1997 04 13 06 58 14 8.3 -9 672.80 -59.2 -59.3 -59.3 63 -99 SPO 1997 04 13 06 59 14 8.3 -9 672.80 -59.2 -59.3 -59.3 63 -99 SPO 1997 04 13 07 00 14 8.3 -9 672.80 -59.2 -59.3 -59.3 63 0 SPO 1997 04 13 07 01 13 9.0 -9 672.80 -59.2 -59.2 -59.2 62 -99 SPO 1997 04 13 07 02 13 8.4 -9 672.70 -59.2 -59.3 -59.3 61 -99 SPO 1997 04 13 07 03 14 9.1 -9 672.70 -59.2 -59.3 -59.3 61 -99 SPO 1997 04 13 07 04 14 8.8 -9 672.70 -59.2 -59.3 -59.2 61 -99 SPO 1997 04 13 07 05 14 9.4 -9 672.70 -59.2 -59.3 -59.3 61 -99 SPO 1997 04 13 07 06 14 8.8 -9 672.70 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 07 07 14 8.9 -9 672.60 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 07 08 14 9.1 -9 672.60 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 07 09 14 9.3 -9 672.60 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 07 10 14 9.2 -9 672.60 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 13 07 11 13 9.4 -9 672.60 -59.2 -59.4 -59.4 61 -99 SPO 1997 04 13 07 12 14 9.4 -9 672.70 -59.3 -59.4 -59.4 62 -99 SPO 1997 04 13 07 13 14 8.9 -9 672.70 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 13 07 14 15 8.8 -9 672.70 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 13 07 15 14 8.8 -9 672.70 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 13 07 16 14 8.4 -9 672.70 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 13 07 17 15 8.5 -9 672.70 -59.3 -59.4 -59.5 60 -99 SPO 1997 04 13 07 18 15 8.5 -9 672.70 -59.3 -59.4 -59.5 60 -99 SPO 1997 04 13 07 19 15 8.6 -9 672.80 -59.4 -59.5 -59.5 61 -99 SPO 1997 04 13 07 20 15 8.7 -9 672.80 -59.4 -59.5 -59.5 62 -99 SPO 1997 04 13 07 21 15 8.6 -9 672.80 -59.4 -59.6 -59.5 62 -99 SPO 1997 04 13 07 22 15 8.5 -9 672.80 -59.4 -59.6 -59.6 62 -99 SPO 1997 04 13 07 23 14 8.5 -9 672.80 -59.4 -59.6 -59.6 62 -99 SPO 1997 04 13 07 24 14 8.6 -9 672.80 -59.5 -59.6 -59.6 63 -99 SPO 1997 04 13 07 25 14 8.5 -9 672.80 -59.5 -59.6 -59.6 62 -99 SPO 1997 04 13 07 26 14 8.4 -9 672.80 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 07 27 15 8.7 -9 672.80 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 07 28 14 8.5 -9 672.80 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 07 29 14 8.3 -9 672.80 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 07 30 14 8.2 -9 672.80 -59.5 -59.5 -59.7 61 -99 SPO 1997 04 13 07 31 14 8.7 -9 672.80 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 07 32 14 8.7 -9 672.80 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 07 33 14 8.2 -9 672.80 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 07 34 14 8.5 -9 672.80 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 07 35 14 8.5 -9 672.80 -59.5 -59.5 -59.6 61 -99 SPO 1997 04 13 07 36 14 8.5 -9 672.80 -59.5 -59.6 -59.6 61 -99 SPO 1997 04 13 07 37 14 8.5 -9 672.80 -59.5 -59.6 -59.7 61 -99 SPO 1997 04 13 07 38 14 8.2 -9 672.90 -59.5 -59.6 -59.7 60 -99 SPO 1997 04 13 07 39 13 8.4 -9 672.90 -59.5 -59.6 -59.6 60 -99 SPO 1997 04 13 07 40 13 8.3 -9 672.90 -59.5 -59.5 -59.6 60 -99 SPO 1997 04 13 07 41 13 8.4 -9 672.90 -59.6 -59.5 -59.6 60 -99 SPO 1997 04 13 07 42 13 8.3 -9 672.90 -59.5 -59.4 -59.6 61 -99 SPO 1997 04 13 07 43 12 8.2 -9 672.90 -59.5 -59.4 -59.6 61 -99 SPO 1997 04 13 07 44 12 8.6 -9 672.90 -59.5 -59.4 -59.6 61 -99 SPO 1997 04 13 07 45 13 8.6 -9 672.90 -59.5 -59.4 -59.6 61 -99 SPO 1997 04 13 07 46 13 8.6 -9 672.90 -59.5 -59.4 -59.6 61 -99 SPO 1997 04 13 07 47 13 9.0 -9 672.90 -59.4 -59.4 -59.5 61 -99 SPO 1997 04 13 07 48 13 8.4 -9 672.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 13 07 49 13 8.6 -9 672.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 13 07 50 14 8.7 -9 672.80 -59.4 -59.3 -59.5 59 -99 SPO 1997 04 13 07 51 13 8.9 -9 672.90 -59.4 -59.3 -59.4 59 -99 SPO 1997 04 13 07 52 13 8.7 -9 672.90 -59.4 -59.3 -59.4 59 -99 SPO 1997 04 13 07 53 12 9.1 -9 672.80 -59.4 -59.3 -59.4 61 -99 SPO 1997 04 13 07 54 13 9.1 -9 672.80 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 13 07 55 12 8.6 -9 672.80 -59.4 -59.3 -59.4 61 -99 SPO 1997 04 13 07 56 13 8.6 -9 672.80 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 13 07 57 13 8.6 -9 672.80 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 13 07 58 13 8.7 -9 672.80 -59.4 -59.2 -59.4 62 -99 SPO 1997 04 13 07 59 13 8.7 -9 672.80 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 13 08 00 14 8.4 -9 672.80 -59.4 -59.2 -59.5 61 0 SPO 1997 04 13 08 01 14 8.5 -9 672.80 -59.4 -59.2 -59.5 61 -99 SPO 1997 04 13 08 02 13 9.0 -9 672.80 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 13 08 03 12 8.9 -9 672.80 -59.4 -59.1 -59.4 61 -99 SPO 1997 04 13 08 04 11 8.9 -9 672.80 -59.3 -59.1 -59.4 60 -99 SPO 1997 04 13 08 05 10 9.6 -9 672.80 -59.3 -59.0 -59.4 61 -99 SPO 1997 04 13 08 06 10 9.7 -9 672.70 -59.3 -59.0 -59.3 61 -99 SPO 1997 04 13 08 07 9 9.8 -9 672.70 -59.3 -59.0 -59.3 62 -99 SPO 1997 04 13 08 08 9 10.1 -9 672.70 -59.2 -59.0 -59.3 61 -99 SPO 1997 04 13 08 09 8 10.0 -9 672.70 -59.2 -59.0 -59.2 62 -99 SPO 1997 04 13 08 10 8 10.2 -9 672.70 -59.2 -58.9 -59.2 62 -99 SPO 1997 04 13 08 11 8 10.2 -9 672.70 -59.2 -58.9 -59.2 61 -99 SPO 1997 04 13 08 12 9 10.0 -9 672.70 -59.2 -58.9 -59.2 61 -99 SPO 1997 04 13 08 13 8 10.3 -9 672.70 -59.1 -59.0 -59.2 61 -99 SPO 1997 04 13 08 14 9 10.1 -9 672.70 -59.1 -58.9 -59.2 61 -99 SPO 1997 04 13 08 15 9 10.1 -9 672.70 -59.1 -58.9 -59.2 61 -99 SPO 1997 04 13 08 16 9 9.7 -9 672.70 -59.1 -58.9 -59.2 61 -99 SPO 1997 04 13 08 17 9 10.1 -9 672.70 -59.1 -58.9 -59.1 61 -99 SPO 1997 04 13 08 18 10 9.7 -9 672.80 -59.0 -58.9 -59.1 61 -99 SPO 1997 04 13 08 19 10 9.8 -9 672.70 -59.0 -58.8 -59.1 61 -99 SPO 1997 04 13 08 20 10 9.7 -9 672.70 -59.0 -58.8 -59.1 61 -99 SPO 1997 04 13 08 21 11 9.8 -9 672.80 -59.0 -58.8 -59.1 61 -99 SPO 1997 04 13 08 22 10 9.6 -9 672.80 -59.0 -58.9 -59.0 61 -99 SPO 1997 04 13 08 23 10 9.5 -9 672.80 -59.0 -58.9 -59.0 61 -99 SPO 1997 04 13 08 24 10 9.4 -9 672.80 -58.9 -58.9 -59.0 61 -99 SPO 1997 04 13 08 25 11 9.8 -9 672.80 -58.9 -58.9 -59.0 61 -99 SPO 1997 04 13 08 26 11 9.5 -9 672.80 -58.9 -58.8 -58.9 61 -99 SPO 1997 04 13 08 27 10 9.7 -9 672.80 -58.9 -58.8 -58.9 61 -99 SPO 1997 04 13 08 28 10 9.8 -9 672.80 -58.9 -58.8 -58.9 63 -99 SPO 1997 04 13 08 29 11 9.6 -9 672.80 -58.8 -58.8 -58.9 62 -99 SPO 1997 04 13 08 30 10 9.4 -9 672.90 -58.8 -58.8 -58.9 63 -99 SPO 1997 04 13 08 31 10 9.9 -9 672.90 -58.8 -58.7 -58.8 63 -99 SPO 1997 04 13 08 32 10 9.6 -9 672.90 -58.8 -58.7 -58.8 63 -99 SPO 1997 04 13 08 33 9 9.7 -9 672.90 -58.8 -58.7 -58.9 63 -99 SPO 1997 04 13 08 34 9 9.6 -9 672.90 -58.7 -58.7 -58.8 61 -99 SPO 1997 04 13 08 35 9 9.5 -9 672.90 -58.7 -58.7 -58.8 61 -99 SPO 1997 04 13 08 36 10 9.7 -9 672.90 -58.7 -58.7 -58.8 61 -99 SPO 1997 04 13 08 37 10 9.3 -9 672.90 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 08 38 10 9.3 -9 672.90 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 08 39 10 9.7 -9 672.90 -58.7 -58.7 -58.8 61 -99 SPO 1997 04 13 08 40 10 9.7 -9 672.90 -58.7 -58.7 -58.8 61 -99 SPO 1997 04 13 08 41 10 9.5 -9 672.90 -58.7 -58.7 -58.8 62 -99 SPO 1997 04 13 08 42 10 9.8 -9 672.90 -58.7 -58.6 -58.7 63 -99 SPO 1997 04 13 08 43 10 9.3 -9 672.90 -58.6 -58.6 -58.7 63 -99 SPO 1997 04 13 08 44 10 9.4 -9 672.90 -58.6 -58.6 -58.7 63 -99 SPO 1997 04 13 08 45 11 9.2 -9 672.90 -58.6 -58.6 -58.7 62 -99 SPO 1997 04 13 08 46 11 9.4 -9 672.90 -58.6 -58.6 -58.7 62 -99 SPO 1997 04 13 08 47 10 8.6 -9 672.90 -58.6 -58.5 -58.6 62 -99 SPO 1997 04 13 08 48 10 9.0 -9 672.90 -58.6 -58.5 -58.6 62 -99 SPO 1997 04 13 08 49 12 9.1 -9 672.90 -58.5 -58.5 -58.6 62 -99 SPO 1997 04 13 08 50 12 8.9 -9 672.90 -58.5 -58.5 -58.6 62 -99 SPO 1997 04 13 08 51 11 8.6 -9 672.90 -58.5 -58.4 -58.6 63 -99 SPO 1997 04 13 08 52 10 8.7 -9 672.90 -58.5 -58.4 -58.6 63 -99 SPO 1997 04 13 08 53 10 9.1 -9 672.90 -58.4 -58.4 -58.5 62 -99 SPO 1997 04 13 08 54 10 9.2 -9 672.90 -58.4 -58.4 -58.5 62 -99 SPO 1997 04 13 08 55 9 9.4 -9 672.90 -58.4 -58.4 -58.5 62 -99 SPO 1997 04 13 08 56 9 9.1 -9 672.90 -58.4 -58.3 -58.4 62 -99 SPO 1997 04 13 08 57 9 9.2 -9 672.90 -58.4 -58.3 -58.4 62 -99 SPO 1997 04 13 08 58 8 9.4 -9 672.90 -58.4 -58.3 -58.4 62 -99 SPO 1997 04 13 08 59 8 9.5 -9 672.90 -58.4 -58.2 -58.3 62 -99 SPO 1997 04 13 09 00 8 9.9 -9 672.90 -58.3 -58.2 -58.3 62 0 SPO 1997 04 13 09 01 7 9.5 -9 672.90 -58.3 -58.2 -58.3 62 -99 SPO 1997 04 13 09 02 8 9.8 -9 672.90 -58.2 -58.1 -58.3 62 -99 SPO 1997 04 13 09 03 8 9.6 -9 672.90 -58.2 -58.1 -58.2 62 -99 SPO 1997 04 13 09 04 8 10.0 -9 672.90 -58.2 -58.0 -58.2 63 -99 SPO 1997 04 13 09 05 8 9.7 -9 672.90 -58.1 -58.0 -58.2 63 -99 SPO 1997 04 13 09 06 8 9.7 -9 672.90 -58.1 -58.0 -58.1 63 -99 SPO 1997 04 13 09 07 9 9.5 -9 672.90 -58.1 -58.0 -58.1 63 -99 SPO 1997 04 13 09 08 9 9.7 -9 673.00 -58.0 -58.0 -58.1 62 -99 SPO 1997 04 13 09 09 8 9.5 -9 673.00 -58.0 -58.0 -58.1 62 -99 SPO 1997 04 13 09 10 8 9.5 -9 673.00 -58.0 -58.0 -58.1 62 -99 SPO 1997 04 13 09 11 8 9.8 -9 673.00 -58.0 -58.0 -58.1 62 -99 SPO 1997 04 13 09 12 9 9.7 -9 673.00 -58.0 -58.1 -58.1 62 -99 SPO 1997 04 13 09 13 9 9.6 -9 673.00 -58.0 -58.0 -58.1 63 -99 SPO 1997 04 13 09 14 8 9.6 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 09 15 9 9.4 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 09 16 10 9.2 -9 673.00 -58.0 -58.0 -58.0 65 -99 SPO 1997 04 13 09 17 9 9.2 -9 673.00 -58.0 -58.0 -58.1 66 -99 SPO 1997 04 13 09 18 10 9.2 -9 673.00 -58.0 -58.0 -58.1 66 -99 SPO 1997 04 13 09 19 10 9.2 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 09 20 10 9.4 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 09 21 10 9.4 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 09 22 9 9.1 -9 673.00 -58.0 -58.0 -58.2 63 -99 SPO 1997 04 13 09 23 8 9.3 -9 673.00 -58.0 -58.0 -58.2 62 -99 SPO 1997 04 13 09 24 9 10.0 -9 673.00 -58.0 -58.0 -58.2 62 -99 SPO 1997 04 13 09 25 8 9.8 -9 673.00 -58.0 -58.0 -58.2 62 -99 SPO 1997 04 13 09 26 9 10.1 -9 673.00 -58.0 -58.0 -58.2 62 -99 SPO 1997 04 13 09 27 9 10.1 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 28 8 10.0 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 29 9 10.3 -9 672.90 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 09 30 9 9.7 -9 672.90 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 09 31 8 9.9 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 32 9 9.6 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 33 9 9.7 -9 672.90 -58.1 -58.1 -58.2 62 -99 SPO 1997 04 13 09 34 9 9.4 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 35 9 9.8 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 36 11 9.1 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 37 10 9.2 -9 673.00 -58.1 -58.1 -58.3 63 -99 SPO 1997 04 13 09 38 10 9.2 -9 673.00 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 09 39 10 9.2 -9 673.00 -58.1 -58.1 -58.3 63 -99 SPO 1997 04 13 09 40 10 9.3 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 41 9 9.6 -9 673.00 -58.1 -58.2 -58.3 63 -99 SPO 1997 04 13 09 42 9 9.6 -9 673.00 -58.2 -58.2 -58.2 63 -99 SPO 1997 04 13 09 43 8 9.9 -9 673.00 -58.1 -58.2 -58.2 62 -99 SPO 1997 04 13 09 44 8 9.9 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 45 9 9.8 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 46 8 9.8 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 47 9 9.7 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 48 8 9.4 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 49 8 9.7 -9 672.90 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 50 9 9.6 -9 673.00 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 09 51 8 9.8 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 52 8 9.9 -9 673.00 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 09 53 8 9.7 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 54 8 9.4 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 55 8 9.3 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 56 9 9.6 -9 673.00 -58.1 -58.1 -58.2 62 -99 SPO 1997 04 13 09 57 8 9.6 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 58 8 9.3 -9 673.00 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 13 09 59 9 9.1 -9 673.00 -58.1 -58.2 -58.2 63 -99 SPO 1997 04 13 10 00 8 9.6 -9 673.00 -58.1 -58.2 -58.2 64 0 SPO 1997 04 13 10 01 9 9.6 -9 673.00 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 13 10 02 9 9.6 -9 673.00 -58.1 -58.1 -58.1 64 -99 SPO 1997 04 13 10 03 9 9.4 -9 673.00 -58.1 -58.1 -58.1 66 -99 SPO 1997 04 13 10 04 10 9.1 -9 673.00 -58.0 -58.1 -58.1 65 -99 SPO 1997 04 13 10 05 10 8.9 -9 673.00 -58.1 -58.1 -58.1 64 -99 SPO 1997 04 13 10 06 10 9.1 -9 673.00 -58.0 -58.1 -58.1 63 -99 SPO 1997 04 13 10 07 10 9.5 -9 673.00 -58.0 -58.0 -58.1 63 -99 SPO 1997 04 13 10 08 9 9.3 -9 673.00 -58.0 -58.0 -58.1 63 -99 SPO 1997 04 13 10 09 10 9.4 -9 673.00 -58.0 -58.0 -58.1 63 -99 SPO 1997 04 13 10 10 11 9.4 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 10 11 10 8.9 -9 673.00 -58.0 -58.0 -58.1 65 -99 SPO 1997 04 13 10 12 9 9.5 -9 673.00 -58.0 -58.0 -58.1 63 -99 SPO 1997 04 13 10 13 9 9.2 -9 673.00 -58.0 -58.1 -58.1 65 -99 SPO 1997 04 13 10 14 9 9.2 -9 673.00 -58.0 -58.0 -58.0 65 -99 SPO 1997 04 13 10 15 9 9.7 -9 673.00 -58.0 -58.1 -58.0 65 -99 SPO 1997 04 13 10 16 9 9.7 -9 673.00 -57.9 -58.1 -58.0 62 -99 SPO 1997 04 13 10 17 9 9.8 -9 673.00 -58.0 -58.0 -58.0 63 -99 SPO 1997 04 13 10 18 10 9.8 -9 673.00 -57.9 -58.0 -58.0 62 -99 SPO 1997 04 13 10 19 10 9.4 -9 673.00 -57.9 -58.0 -58.0 62 -99 SPO 1997 04 13 10 20 9 9.5 -9 673.00 -57.9 -58.0 -58.0 62 -99 SPO 1997 04 13 10 21 9 9.3 -9 673.00 -57.9 -57.9 -57.9 64 -99 SPO 1997 04 13 10 22 9 9.9 -9 673.10 -57.8 -57.9 -57.9 63 -99 SPO 1997 04 13 10 23 8 9.3 -9 673.10 -57.8 -57.8 -57.9 64 -99 SPO 1997 04 13 10 24 8 9.2 -9 673.10 -57.8 -57.8 -57.9 64 -99 SPO 1997 04 13 10 25 8 9.9 -9 673.10 -57.8 -57.8 -57.8 64 -99 SPO 1997 04 13 10 26 8 9.7 -9 673.10 -57.8 -57.8 -57.8 65 -99 SPO 1997 04 13 10 27 8 9.8 -9 673.10 -57.8 -57.8 -57.9 64 -99 SPO 1997 04 13 10 28 9 10.0 -9 673.10 -57.8 -57.8 -57.8 63 -99 SPO 1997 04 13 10 29 8 9.2 -9 673.10 -57.8 -57.9 -57.9 63 -99 SPO 1997 04 13 10 30 8 9.5 -9 673.10 -57.8 -57.9 -57.9 63 -99 SPO 1997 04 13 10 31 9 9.5 -9 673.10 -57.8 -58.0 -57.9 63 -99 SPO 1997 04 13 10 32 9 9.2 -9 673.10 -57.8 -57.9 -57.9 63 -99 SPO 1997 04 13 10 33 8 9.2 -9 673.10 -57.8 -57.9 -57.9 63 -99 SPO 1997 04 13 10 34 8 9.2 -9 673.10 -57.8 -57.9 -57.9 64 -99 SPO 1997 04 13 10 35 7 9.6 -9 673.00 -57.8 -57.9 -57.9 64 -99 SPO 1997 04 13 10 36 8 9.3 -9 673.00 -57.8 -57.9 -57.9 65 -99 SPO 1997 04 13 10 37 7 10.0 -9 673.00 -57.8 -57.9 -57.9 65 -99 SPO 1997 04 13 10 38 7 9.7 -9 673.00 -57.8 -57.8 -57.9 66 -99 SPO 1997 04 13 10 39 9 9.8 -9 673.00 -57.8 -57.8 -57.9 65 -99 SPO 1997 04 13 10 40 8 9.7 -9 673.10 -57.8 -57.8 -57.9 64 -99 SPO 1997 04 13 10 41 9 9.1 -9 673.10 -57.8 -57.8 -57.9 63 -99 SPO 1997 04 13 10 42 9 9.7 -9 673.00 -57.8 -57.8 -57.9 63 -99 SPO 1997 04 13 10 43 8 8.9 -9 673.00 -57.8 -57.8 -57.9 62 -99 SPO 1997 04 13 10 44 9 9.6 -9 673.00 -57.8 -57.8 -57.8 63 -99 SPO 1997 04 13 10 45 9 9.2 -9 673.10 -57.7 -57.8 -57.8 63 -99 SPO 1997 04 13 10 46 10 9.3 -9 673.10 -57.7 -57.9 -57.8 63 -99 SPO 1997 04 13 10 47 10 9.4 -9 673.10 -57.7 -57.9 -57.8 64 -99 SPO 1997 04 13 10 48 10 9.7 -9 673.10 -57.7 -57.9 -57.8 65 -99 SPO 1997 04 13 10 49 9 9.6 -9 673.00 -57.7 -57.8 -57.7 65 -99 SPO 1997 04 13 10 50 9 9.8 -9 673.10 -57.7 -57.8 -57.7 65 -99 SPO 1997 04 13 10 51 9 9.6 -9 673.10 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 13 10 52 10 10.2 -9 673.00 -57.6 -57.7 -57.7 63 -99 SPO 1997 04 13 10 53 9 10.1 -9 673.00 -57.6 -57.7 -57.7 63 -99 SPO 1997 04 13 10 54 9 10.1 -9 673.00 -57.6 -57.7 -57.6 63 -99 SPO 1997 04 13 10 55 8 10.1 -9 673.00 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 13 10 56 8 10.2 -9 673.00 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 13 10 57 8 10.0 -9 673.00 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 10 58 8 10.3 -9 673.10 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 10 59 8 10.2 -9 673.10 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 11 00 8 9.8 -9 673.10 -57.5 -57.6 -57.6 66 0 SPO 1997 04 13 11 01 8 10.1 -9 673.10 -57.5 -57.7 -57.6 66 -99 SPO 1997 04 13 11 02 8 9.9 -9 673.10 -57.5 -57.7 -57.6 65 -99 SPO 1997 04 13 11 03 8 10.0 -9 673.10 -57.5 -57.7 -57.6 65 -99 SPO 1997 04 13 11 04 8 9.9 -9 673.10 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 11 05 9 9.8 -9 673.20 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 11 06 9 9.7 -9 673.20 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 11 07 10 10.0 -9 673.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 11 08 10 10.2 -9 673.20 -57.4 -57.6 -57.6 65 -99 SPO 1997 04 13 11 09 11 9.5 -9 673.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 11 10 10 9.3 -9 673.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 11 11 10 9.8 -9 673.20 -57.5 -57.6 -57.6 67 -99 SPO 1997 04 13 11 12 10 9.5 -9 673.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 13 11 13 10 9.9 -9 673.20 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 11 14 10 9.6 -9 673.20 -57.5 -57.6 -57.7 64 -99 SPO 1997 04 13 11 15 10 9.5 -9 673.20 -57.5 -57.7 -57.7 64 -99 SPO 1997 04 13 11 16 10 10.1 -9 673.20 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 13 11 17 11 10.0 -9 673.20 -57.6 -57.8 -57.7 64 -99 SPO 1997 04 13 11 18 11 9.8 -9 673.20 -57.6 -57.8 -57.7 64 -99 SPO 1997 04 13 11 19 11 9.8 -9 673.20 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 13 11 20 10 9.9 -9 673.20 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 13 11 21 11 10.1 -9 673.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 13 11 22 11 9.5 -9 673.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 13 11 23 11 10.2 -9 673.20 -57.6 -57.8 -57.8 66 -99 SPO 1997 04 13 11 24 11 10.1 -9 673.20 -57.6 -57.7 -57.8 65 -99 SPO 1997 04 13 11 25 11 9.5 -9 673.20 -57.6 -57.7 -57.8 65 -99 SPO 1997 04 13 11 26 11 9.6 -9 673.30 -57.6 -57.7 -57.8 65 -99 SPO 1997 04 13 11 27 11 9.8 -9 673.30 -57.7 -57.7 -57.8 65 -99 SPO 1997 04 13 11 28 11 10.2 -9 673.20 -57.7 -57.7 -57.8 64 -99 SPO 1997 04 13 11 29 10 9.9 -9 673.20 -57.7 -57.7 -57.7 64 -99 SPO 1997 04 13 11 30 9 10.0 -9 673.20 -57.6 -57.7 -57.7 63 -99 SPO 1997 04 13 11 31 9 10.2 -9 673.20 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 13 11 32 9 9.7 -9 673.20 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 13 11 33 9 10.0 -9 673.30 -57.6 -57.8 -57.6 65 -99 SPO 1997 04 13 11 34 9 9.7 -9 673.30 -57.6 -57.7 -57.6 65 -99 SPO 1997 04 13 11 35 9 9.5 -9 673.30 -57.6 -57.7 -57.6 65 -99 SPO 1997 04 13 11 36 8 10.3 -9 673.30 -57.6 -57.7 -57.6 65 -99 SPO 1997 04 13 11 37 9 9.6 -9 673.30 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 13 11 38 9 9.2 -9 673.20 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 13 11 39 9 9.4 -9 673.20 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 13 11 40 9 9.9 -9 673.30 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 13 11 41 8 9.9 -9 673.20 -57.5 -57.6 -57.6 65 -99 SPO 1997 04 13 11 42 8 9.9 -9 673.20 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 11 43 8 10.2 -9 673.20 -57.4 -57.5 -57.5 65 -99 SPO 1997 04 13 11 44 8 10.1 -9 673.20 -57.4 -57.5 -57.5 65 -99 SPO 1997 04 13 11 45 8 10.5 -9 673.20 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 13 11 46 7 10.2 -9 673.20 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 13 11 47 7 10.2 -9 673.20 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 13 11 48 7 10.3 -9 673.20 -57.4 -57.5 -57.5 65 -99 SPO 1997 04 13 11 49 8 10.7 -9 673.20 -57.4 -57.5 -57.5 64 -99 SPO 1997 04 13 11 50 8 10.6 -9 673.20 -57.4 -57.5 -57.5 64 -99 SPO 1997 04 13 11 51 9 10.1 -9 673.20 -57.4 -57.5 -57.6 64 -99 SPO 1997 04 13 11 52 8 10.2 -9 673.20 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 11 53 9 10.4 -9 673.20 -57.5 -57.4 -57.6 65 -99 SPO 1997 04 13 11 54 9 10.0 -9 673.20 -57.5 -57.4 -57.6 65 -99 SPO 1997 04 13 11 55 9 10.2 -9 673.20 -57.5 -57.4 -57.6 65 -99 SPO 1997 04 13 11 56 9 10.1 -9 673.20 -57.5 -57.4 -57.6 65 -99 SPO 1997 04 13 11 57 10 9.6 -9 673.20 -57.5 -57.4 -57.6 65 -99 SPO 1997 04 13 11 58 10 9.8 -9 673.20 -57.5 -57.4 -57.6 64 -99 SPO 1997 04 13 11 59 11 9.6 -9 673.30 -57.5 -57.5 -57.6 63 -99 SPO 1997 04 13 12 00 10 9.7 -9 673.20 -57.5 -57.4 -57.6 63 0 SPO 1997 04 13 12 01 10 10.1 -9 673.20 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 13 12 02 10 9.9 -9 673.20 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 13 12 03 10 9.8 -9 673.30 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 13 12 04 10 9.6 -9 673.30 -57.5 -57.4 -57.6 63 -99 SPO 1997 04 13 12 05 12 9.8 -9 673.30 -57.5 -57.4 -57.6 64 -99 SPO 1997 04 13 12 06 12 9.7 -9 673.30 -57.5 -57.5 -57.5 64 -99 SPO 1997 04 13 12 07 12 9.5 -9 673.30 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 12 08 14 9.4 -9 673.30 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 12 09 14 8.9 -9 673.40 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 12 10 15 9.2 -9 673.40 -57.5 -57.5 -57.6 65 -99 SPO 1997 04 13 12 11 15 8.8 -9 673.40 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 13 12 12 16 8.8 -9 673.40 -57.4 -57.5 -57.5 63 -99 SPO 1997 04 13 12 13 16 8.5 -9 673.40 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 13 12 14 17 8.5 -9 673.40 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 13 12 15 17 8.3 -9 673.50 -57.4 -57.4 -57.4 63 -99 SPO 1997 04 13 12 16 18 8.1 -9 673.40 -57.3 -57.4 -57.4 63 -99 SPO 1997 04 13 12 17 18 8.1 -9 673.50 -57.3 -57.3 -57.3 63 -99 SPO 1997 04 13 12 18 17 7.7 -9 673.50 -57.3 -57.3 -57.3 63 -99 SPO 1997 04 13 12 19 17 7.8 -9 673.50 -57.3 -57.4 -57.3 64 -99 SPO 1997 04 13 12 20 17 8.0 -9 673.50 -57.3 -57.4 -57.3 65 -99 SPO 1997 04 13 12 21 16 8.4 -9 673.50 -57.2 -57.4 -57.3 64 -99 SPO 1997 04 13 12 22 16 8.0 -9 673.50 -57.2 -57.4 -57.3 64 -99 SPO 1997 04 13 12 23 16 7.8 -9 673.50 -57.2 -57.4 -57.3 64 -99 SPO 1997 04 13 12 24 16 7.9 -9 673.50 -57.2 -57.4 -57.3 64 -99 SPO 1997 04 13 12 25 16 7.7 -9 673.50 -57.2 -57.3 -57.3 63 -99 SPO 1997 04 13 12 26 15 7.9 -9 673.50 -57.2 -57.3 -57.2 63 -99 SPO 1997 04 13 12 27 15 8.1 -9 673.50 -57.2 -57.3 -57.2 64 -99 SPO 1997 04 13 12 28 16 7.5 -9 673.60 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 13 12 29 15 7.8 -9 673.60 -57.1 -57.2 -57.2 64 -99 SPO 1997 04 13 12 30 16 7.4 -9 673.60 -57.1 -57.2 -57.2 64 -99 SPO 1997 04 13 12 31 16 7.3 -9 673.60 -57.1 -57.2 -57.2 65 -99 SPO 1997 04 13 12 32 16 7.7 -9 673.60 -57.1 -57.2 -57.2 64 -99 SPO 1997 04 13 12 33 16 7.3 -9 673.60 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 13 12 34 14 7.9 -9 673.60 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 13 12 35 15 8.0 -9 673.60 -57.1 -57.2 -57.2 63 -99 SPO 1997 04 13 12 36 14 7.6 -9 673.60 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 13 12 37 14 8.4 -9 673.60 -57.0 -57.3 -57.2 62 -99 SPO 1997 04 13 12 38 13 8.1 -9 673.60 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 39 13 8.5 -9 673.50 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 40 13 8.6 -9 673.50 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 41 14 8.4 -9 673.50 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 42 14 8.6 -9 673.50 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 43 14 8.2 -9 673.60 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 44 15 8.4 -9 673.60 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 45 15 8.2 -9 673.60 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 46 14 8.6 -9 673.60 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 47 15 8.4 -9 673.60 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 48 13 8.4 -9 673.50 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 49 14 9.0 -9 673.50 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 50 14 9.0 -9 673.50 -57.0 -57.1 -57.1 63 -99 SPO 1997 04 13 12 51 14 8.8 -9 673.50 -57.0 -57.2 -57.1 64 -99 SPO 1997 04 13 12 52 13 9.1 -9 673.50 -57.0 -57.2 -57.1 64 -99 SPO 1997 04 13 12 53 13 9.3 -9 673.40 -56.9 -57.2 -57.1 63 -99 SPO 1997 04 13 12 54 13 8.8 -9 673.40 -56.9 -57.2 -57.1 63 -99 SPO 1997 04 13 12 55 13 9.1 -9 673.40 -56.9 -57.2 -57.1 63 -99 SPO 1997 04 13 12 56 13 9.1 -9 673.40 -56.9 -57.2 -57.1 63 -99 SPO 1997 04 13 12 57 13 9.0 -9 673.40 -57.0 -57.2 -57.1 63 -99 SPO 1997 04 13 12 58 14 8.8 -9 673.40 -57.0 -57.1 -57.0 63 -99 SPO 1997 04 13 12 59 13 9.2 -9 673.40 -57.0 -57.1 -57.0 63 -99 SPO 1997 04 13 13 00 13 9.6 -9 673.40 -56.9 -57.0 -57.0 63 0 SPO 1997 04 13 13 01 12 9.1 -9 673.40 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 13 13 02 12 9.6 -9 673.40 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 13 13 03 12 9.8 -9 673.40 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 13 13 04 13 9.9 -9 673.40 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 13 13 05 13 9.5 -9 673.40 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 13 13 06 12 9.5 -9 673.40 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 07 12 9.2 -9 673.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 08 12 9.8 -9 673.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 09 13 9.8 -9 673.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 10 13 9.9 -9 673.40 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 11 13 9.7 -9 673.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 12 14 9.6 -9 673.30 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 13 15 9.7 -9 673.40 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 13 13 14 15 9.4 -9 673.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 15 16 8.9 -9 673.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 16 16 8.5 -9 673.40 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 17 17 9.0 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 18 17 9.1 -9 673.50 -56.7 -56.8 -56.8 64 -99 SPO 1997 04 13 13 19 17 8.8 -9 673.50 -56.7 -56.8 -56.8 64 -99 SPO 1997 04 13 13 20 18 8.5 -9 673.50 -56.7 -56.8 -56.7 64 -99 SPO 1997 04 13 13 21 17 8.7 -9 673.50 -56.6 -56.8 -56.7 63 -99 SPO 1997 04 13 13 22 18 8.1 -9 673.50 -56.6 -56.8 -56.7 62 -99 SPO 1997 04 13 13 23 18 9.2 -9 673.50 -56.6 -56.8 -56.7 63 -99 SPO 1997 04 13 13 24 17 8.6 -9 673.50 -56.6 -56.9 -56.8 64 -99 SPO 1997 04 13 13 25 18 8.4 -9 673.50 -56.6 -56.9 -56.8 64 -99 SPO 1997 04 13 13 26 19 8.4 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 27 20 8.6 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 28 19 8.7 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 29 20 8.9 -9 673.50 -56.6 -56.9 -56.8 63 -99 SPO 1997 04 13 13 30 20 8.5 -9 673.50 -56.6 -56.9 -56.8 62 -99 SPO 1997 04 13 13 31 20 8.8 -9 673.50 -56.6 -56.8 -56.7 62 -99 SPO 1997 04 13 13 32 20 9.5 -9 673.50 -56.7 -56.8 -56.7 64 -99 SPO 1997 04 13 13 33 19 8.9 -9 673.50 -56.6 -56.8 -56.8 63 -99 SPO 1997 04 13 13 34 20 8.6 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 35 19 8.7 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 36 19 9.0 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 37 18 8.9 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 38 19 9.0 -9 673.50 -56.7 -56.9 -56.8 64 -99 SPO 1997 04 13 13 39 20 9.3 -9 673.50 -56.7 -56.9 -56.9 64 -99 SPO 1997 04 13 13 40 20 8.7 -9 673.50 -56.7 -57.0 -56.9 64 -99 SPO 1997 04 13 13 41 20 8.8 -9 673.50 -56.7 -57.0 -56.9 63 -99 SPO 1997 04 13 13 42 20 9.1 -9 673.50 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 43 20 8.5 -9 673.50 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 13 13 44 21 9.0 -9 673.50 -56.8 -57.0 -56.9 63 -99 SPO 1997 04 13 13 45 21 8.7 -9 673.60 -56.7 -57.0 -56.9 62 -99 SPO 1997 04 13 13 46 22 8.2 -9 673.60 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 47 23 8.1 -9 673.60 -56.8 -57.0 -56.9 64 -99 SPO 1997 04 13 13 48 23 8.6 -9 673.60 -56.8 -57.0 -57.0 64 -99 SPO 1997 04 13 13 49 23 8.7 -9 673.60 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 13 13 50 23 8.5 -9 673.60 -56.9 -57.0 -57.0 63 -99 SPO 1997 04 13 13 51 24 8.1 -9 673.60 -56.9 -57.1 -57.1 63 -99 SPO 1997 04 13 13 52 24 7.9 -9 673.70 -56.9 -57.1 -57.1 63 -99 SPO 1997 04 13 13 53 26 8.2 -9 673.70 -57.0 -57.1 -57.1 62 -99 SPO 1997 04 13 13 54 26 8.2 -9 673.70 -57.0 -57.2 -57.2 62 -99 SPO 1997 04 13 13 55 24 7.8 -9 673.70 -57.0 -57.2 -57.2 61 -99 SPO 1997 04 13 13 56 23 8.2 -9 673.70 -57.0 -57.2 -57.2 61 -99 SPO 1997 04 13 13 57 24 8.0 -9 673.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 13 13 58 25 7.9 -9 673.70 -57.0 -57.3 -57.3 62 -99 SPO 1997 04 13 13 59 25 7.5 -9 673.70 -57.1 -57.4 -57.3 63 -99 SPO 1997 04 13 14 00 25 7.9 -9 673.70 -57.2 -57.4 -57.3 63 0 SPO 1997 04 13 14 01 24 8.2 -9 673.70 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 13 14 02 24 8.2 -9 673.70 -57.2 -57.4 -57.4 63 -99 SPO 1997 04 13 14 03 24 7.9 -9 673.70 -57.2 -57.4 -57.4 63 -99 SPO 1997 04 13 14 04 24 8.2 -9 673.70 -57.3 -57.4 -57.5 63 -99 SPO 1997 04 13 14 05 24 8.3 -9 673.70 -57.3 -57.5 -57.5 63 -99 SPO 1997 04 13 14 06 24 8.0 -9 673.70 -57.3 -57.5 -57.5 62 -99 SPO 1997 04 13 14 07 25 8.0 -9 673.70 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 13 14 08 25 7.9 -9 673.70 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 13 14 09 25 8.1 -9 673.70 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 13 14 10 26 7.6 -9 673.70 -57.4 -57.5 -57.6 62 -99 SPO 1997 04 13 14 11 24 8.1 -9 673.70 -57.4 -57.5 -57.5 62 -99 SPO 1997 04 13 14 12 24 8.2 -9 673.70 -57.5 -57.6 -57.5 63 -99 SPO 1997 04 13 14 13 25 7.7 -9 673.70 -57.5 -57.6 -57.6 63 -99 SPO 1997 04 13 14 14 25 8.0 -9 673.80 -57.5 -57.6 -57.6 62 -99 SPO 1997 04 13 14 15 24 8.0 -9 673.80 -57.5 -57.6 -57.6 62 -99 SPO 1997 04 13 14 16 24 7.6 -9 673.80 -57.5 -57.7 -57.6 61 -99 SPO 1997 04 13 14 17 24 7.5 -9 673.80 -57.5 -57.6 -57.6 61 -99 SPO 1997 04 13 14 18 25 7.7 -9 673.80 -57.5 -57.6 -57.6 59 -99 SPO 1997 04 13 14 19 26 7.7 -9 673.90 -57.6 -57.6 -57.7 60 -99 SPO 1997 04 13 14 20 24 7.8 -9 673.80 -57.6 -57.6 -57.6 62 -99 SPO 1997 04 13 14 21 26 7.7 -9 673.90 -57.5 -57.6 -57.7 61 -99 SPO 1997 04 13 14 22 26 7.6 -9 673.90 -57.6 -57.6 -57.7 62 -99 SPO 1997 04 13 14 23 28 7.3 -9 673.90 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 13 14 24 28 7.2 -9 673.90 -57.6 -57.7 -57.7 60 -99 SPO 1997 04 13 14 25 28 7.0 -9 674.00 -57.6 -57.7 -57.8 59 -99 SPO 1997 04 13 14 26 28 6.8 -9 673.90 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 13 14 27 30 7.1 -9 674.00 -57.7 -57.8 -57.8 59 -99 SPO 1997 04 13 14 28 31 7.0 -9 673.90 -57.7 -57.8 -57.8 59 -99 SPO 1997 04 13 14 29 33 6.5 -9 674.00 -57.7 -57.9 -57.9 59 -99 SPO 1997 04 13 14 30 32 7.1 -9 674.00 -57.8 -58.0 -57.9 59 -99 SPO 1997 04 13 14 31 30 7.0 -9 674.00 -57.8 -58.0 -57.9 60 -99 SPO 1997 04 13 14 32 30 7.2 -9 674.00 -57.9 -57.9 -58.0 61 -99 SPO 1997 04 13 14 33 32 6.7 -9 674.00 -57.9 -58.0 -58.0 61 -99 SPO 1997 04 13 14 34 32 6.9 -9 674.00 -57.9 -58.0 -58.0 61 -99 SPO 1997 04 13 14 35 33 7.0 -9 674.00 -57.9 -58.0 -58.0 61 -99 SPO 1997 04 13 14 36 32 6.9 -9 674.00 -57.9 -58.0 -58.0 60 -99 SPO 1997 04 13 14 37 31 7.1 -9 673.90 -57.9 -58.0 -58.1 60 -99 SPO 1997 04 13 14 38 30 7.2 -9 673.90 -57.9 -58.0 -58.1 59 -99 SPO 1997 04 13 14 39 31 7.0 -9 674.00 -58.0 -58.0 -58.1 59 -99 SPO 1997 04 13 14 40 31 7.0 -9 674.00 -58.0 -58.0 -58.2 59 -99 SPO 1997 04 13 14 41 32 6.9 -9 674.00 -58.0 -58.0 -58.2 58 -99 SPO 1997 04 13 14 42 33 6.9 -9 674.00 -58.0 -58.1 -58.2 58 -99 SPO 1997 04 13 14 43 33 6.8 -9 674.00 -58.1 -58.1 -58.2 59 -99 SPO 1997 04 13 14 44 33 7.0 -9 674.00 -58.1 -58.2 -58.2 59 -99 SPO 1997 04 13 14 45 34 7.0 -9 674.00 -58.1 -58.2 -58.2 59 -99 SPO 1997 04 13 14 46 33 6.5 -9 674.00 -58.1 -58.2 -58.3 60 -99 SPO 1997 04 13 14 47 33 6.6 -9 674.00 -58.2 -58.2 -58.3 60 -99 SPO 1997 04 13 14 48 35 6.4 -9 674.00 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 13 14 49 34 6.7 -9 674.00 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 13 14 50 36 6.5 -9 674.00 -58.2 -58.2 -58.3 59 -99 SPO 1997 04 13 14 51 36 6.6 -9 674.00 -58.2 -58.2 -58.4 59 -99 SPO 1997 04 13 14 52 36 6.8 -9 674.00 -58.3 -58.3 -58.4 59 -99 SPO 1997 04 13 14 53 35 6.8 -9 674.00 -58.3 -58.3 -58.4 59 -99 SPO 1997 04 13 14 54 34 6.4 -9 674.00 -58.3 -58.3 -58.5 59 -99 SPO 1997 04 13 14 55 33 6.7 -9 674.00 -58.3 -58.3 -58.5 60 -99 SPO 1997 04 13 14 56 33 6.9 -9 674.00 -58.3 -58.3 -58.5 60 -99 SPO 1997 04 13 14 57 33 6.9 -9 674.00 -58.4 -58.3 -58.5 60 -99 SPO 1997 04 13 14 58 32 6.9 -9 674.00 -58.4 -58.4 -58.5 60 -99 SPO 1997 04 13 14 59 32 7.0 -9 674.00 -58.4 -58.4 -58.5 59 -99 SPO 1997 04 13 15 00 31 7.3 -9 674.00 -58.4 -58.5 -58.5 59 0 SPO 1997 04 13 15 01 33 6.9 -9 674.00 -58.5 -58.5 -58.6 59 -99 SPO 1997 04 13 15 02 32 7.1 -9 674.00 -58.5 -58.5 -58.6 58 -99 SPO 1997 04 13 15 03 32 7.2 -9 674.00 -58.5 -58.5 -58.6 58 -99 SPO 1997 04 13 15 04 30 7.3 -9 674.00 -58.6 -58.5 -58.7 59 -99 SPO 1997 04 13 15 05 31 7.0 -9 674.00 -58.6 -58.6 -58.7 59 -99 SPO 1997 04 13 15 06 30 7.3 -9 674.00 -58.6 -58.6 -58.7 59 -99 SPO 1997 04 13 15 07 30 7.5 -9 674.00 -58.6 -58.6 -58.7 59 -99 SPO 1997 04 13 15 08 31 7.3 -9 674.00 -58.6 -58.6 -58.7 60 -99 SPO 1997 04 13 15 09 29 7.2 -9 673.90 -58.6 -58.5 -58.7 60 -99 SPO 1997 04 13 15 10 30 7.5 -9 673.90 -58.6 -58.5 -58.7 60 -99 SPO 1997 04 13 15 11 29 7.6 -9 673.90 -58.6 -58.5 -58.7 60 -99 SPO 1997 04 13 15 12 29 7.1 -9 673.90 -58.6 -58.5 -58.7 60 -99 SPO 1997 04 13 15 13 28 7.5 -9 673.90 -58.6 -58.5 -58.8 59 -99 SPO 1997 04 13 15 14 28 7.4 -9 673.90 -58.6 -58.6 -58.8 58 -99 SPO 1997 04 13 15 15 28 7.4 -9 673.90 -58.7 -58.6 -58.8 59 -99 SPO 1997 04 13 15 16 27 7.4 -9 673.90 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 15 17 26 7.3 -9 673.90 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 15 18 26 7.5 -9 673.90 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 15 19 26 7.7 -9 673.90 -58.8 -58.7 -58.8 61 -99 SPO 1997 04 13 15 20 25 8.1 -9 673.80 -58.8 -58.7 -58.8 61 -99 SPO 1997 04 13 15 21 26 8.1 -9 673.80 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 15 22 27 8.3 -9 673.80 -58.7 -58.7 -58.8 60 -99 SPO 1997 04 13 15 23 26 8.3 -9 673.80 -58.7 -58.6 -58.8 59 -99 SPO 1997 04 13 15 24 25 8.3 -9 673.80 -58.7 -58.6 -58.8 59 -99 SPO 1997 04 13 15 25 24 8.6 -9 673.80 -58.7 -58.6 -58.8 59 -99 SPO 1997 04 13 15 26 25 8.7 -9 673.70 -58.7 -58.5 -58.8 59 -99 SPO 1997 04 13 15 27 23 9.2 -9 673.70 -58.7 -58.5 -58.8 59 -99 SPO 1997 04 13 15 28 23 9.4 -9 673.70 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 13 15 29 23 9.2 -9 673.70 -58.7 -58.5 -58.7 60 -99 SPO 1997 04 13 15 30 23 9.2 -9 673.70 -58.6 -58.5 -58.8 59 -99 SPO 1997 04 13 15 31 23 9.6 -9 673.70 -58.7 -58.6 -58.8 61 -99 SPO 1997 04 13 15 32 23 9.5 -9 673.70 -58.7 -58.6 -58.7 61 -99 SPO 1997 04 13 15 33 23 9.1 -9 673.70 -58.7 -58.6 -58.8 60 -99 SPO 1997 04 13 15 34 23 9.4 -9 673.70 -58.7 -58.6 -58.8 60 -99 SPO 1997 04 13 15 35 24 9.1 -9 673.70 -58.7 -58.6 -58.8 60 -99 SPO 1997 04 13 15 36 24 8.8 -9 673.70 -58.8 -58.7 -58.9 59 -99 SPO 1997 04 13 15 37 24 9.1 -9 673.70 -58.8 -58.7 -59.0 59 -99 SPO 1997 04 13 15 38 24 8.9 -9 673.70 -58.8 -58.7 -59.0 58 -99 SPO 1997 04 13 15 39 25 8.9 -9 673.70 -58.9 -58.7 -59.0 59 -99 SPO 1997 04 13 15 40 25 9.0 -9 673.80 -58.9 -58.8 -59.0 60 -99 SPO 1997 04 13 15 41 25 8.8 -9 673.80 -58.9 -58.8 -59.0 60 -99 SPO 1997 04 13 15 42 25 8.9 -9 673.80 -58.9 -58.8 -59.1 60 -99 SPO 1997 04 13 15 43 26 8.7 -9 673.80 -59.0 -58.8 -59.1 61 -99 SPO 1997 04 13 15 44 26 8.8 -9 673.80 -59.0 -58.8 -59.1 59 -99 SPO 1997 04 13 15 45 27 8.5 -9 673.80 -59.0 -58.8 -59.0 59 -99 SPO 1997 04 13 15 46 27 8.2 -9 673.80 -59.0 -58.8 -59.0 58 -99 SPO 1997 04 13 15 47 28 8.6 -9 673.80 -59.0 -58.8 -59.0 58 -99 SPO 1997 04 13 15 48 27 8.4 -9 673.80 -58.9 -58.8 -59.0 58 -99 SPO 1997 04 13 15 49 28 8.2 -9 673.80 -58.9 -58.8 -59.0 58 -99 SPO 1997 04 13 15 50 27 8.3 -9 673.80 -58.9 -58.8 -59.0 58 -99 SPO 1997 04 13 15 51 28 8.1 -9 673.90 -58.9 -58.8 -59.0 59 -99 SPO 1997 04 13 15 52 29 8.2 -9 673.90 -58.9 -58.8 -59.0 59 -99 SPO 1997 04 13 15 53 30 8.2 -9 673.90 -58.9 -58.8 -59.0 59 -99 SPO 1997 04 13 15 54 32 7.8 -9 673.90 -59.0 -58.8 -59.1 60 -99 SPO 1997 04 13 15 55 32 7.8 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 15 56 32 7.5 -9 673.90 -59.0 -58.9 -59.1 58 -99 SPO 1997 04 13 15 57 32 7.9 -9 673.90 -59.0 -58.9 -59.1 58 -99 SPO 1997 04 13 15 58 32 7.7 -9 673.90 -59.0 -58.8 -59.0 58 -99 SPO 1997 04 13 15 59 31 7.9 -9 673.90 -59.0 -58.8 -59.1 58 -99 SPO 1997 04 13 16 00 31 7.7 -9 673.90 -59.0 -58.9 -59.1 58 0 SPO 1997 04 13 16 01 31 7.8 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 16 02 30 7.7 -9 673.90 -59.0 -59.0 -59.1 59 -99 SPO 1997 04 13 16 03 30 8.1 -9 673.90 -59.0 -59.0 -59.2 60 -99 SPO 1997 04 13 16 04 30 7.7 -9 674.00 -59.0 -59.0 -59.2 60 -99 SPO 1997 04 13 16 05 30 7.7 -9 673.90 -59.1 -59.0 -59.2 61 -99 SPO 1997 04 13 16 06 31 7.7 -9 673.90 -59.1 -59.0 -59.2 60 -99 SPO 1997 04 13 16 07 30 7.9 -9 673.90 -59.1 -59.0 -59.2 59 -99 SPO 1997 04 13 16 08 31 7.8 -9 673.90 -59.1 -59.0 -59.2 58 -99 SPO 1997 04 13 16 09 31 7.6 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 10 32 7.8 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 11 32 8.0 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 12 32 7.6 -9 673.90 -59.1 -58.9 -59.1 60 -99 SPO 1997 04 13 16 13 32 7.5 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 14 33 7.8 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 15 33 7.6 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 16 34 8.0 -9 673.90 -59.1 -58.8 -59.2 60 -99 SPO 1997 04 13 16 17 33 7.6 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 16 18 33 7.6 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 16 19 33 7.4 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 16 20 34 7.8 -9 673.90 -59.0 -58.9 -59.1 58 -99 SPO 1997 04 13 16 21 34 7.3 -9 673.90 -59.0 -58.9 -59.1 58 -99 SPO 1997 04 13 16 22 33 7.7 -9 673.90 -59.1 -58.9 -59.1 59 -99 SPO 1997 04 13 16 23 33 8.0 -9 673.90 -59.0 -58.9 -59.1 59 -99 SPO 1997 04 13 16 24 32 7.9 -9 673.90 -59.0 -58.8 -59.1 59 -99 SPO 1997 04 13 16 25 33 7.7 -9 673.90 -59.0 -58.9 -59.1 60 -99 SPO 1997 04 13 16 26 34 7.8 -9 673.90 -59.0 -58.9 -59.1 61 -99 SPO 1997 04 13 16 27 33 7.9 -9 673.90 -59.0 -58.9 -59.2 61 -99 SPO 1997 04 13 16 28 32 7.8 -9 673.90 -59.1 -58.9 -59.2 61 -99 SPO 1997 04 13 16 29 33 7.6 -9 673.90 -59.1 -58.9 -59.2 61 -99 SPO 1997 04 13 16 30 33 7.5 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 31 33 7.5 -9 673.90 -59.1 -58.9 -59.2 59 -99 SPO 1997 04 13 16 32 34 7.6 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 33 34 7.6 -9 673.90 -59.1 -59.0 -59.2 59 -99 SPO 1997 04 13 16 34 35 7.5 -9 673.90 -59.1 -59.0 -59.2 59 -99 SPO 1997 04 13 16 35 35 7.2 -9 673.90 -59.1 -59.0 -59.3 59 -99 SPO 1997 04 13 16 36 35 7.4 -9 673.90 -59.2 -59.0 -59.3 60 -99 SPO 1997 04 13 16 37 34 7.5 -9 673.90 -59.2 -59.0 -59.3 60 -99 SPO 1997 04 13 16 38 35 7.7 -9 673.90 -59.2 -59.0 -59.3 60 -99 SPO 1997 04 13 16 39 35 7.6 -9 673.90 -59.2 -58.9 -59.2 61 -99 SPO 1997 04 13 16 40 35 7.3 -9 673.90 -59.2 -58.9 -59.2 61 -99 SPO 1997 04 13 16 41 36 7.5 -9 673.90 -59.2 -58.9 -59.2 60 -99 SPO 1997 04 13 16 42 36 7.4 -9 673.90 -59.2 -58.9 -59.2 60 -99 SPO 1997 04 13 16 43 36 7.6 -9 673.90 -59.2 -58.9 -59.2 60 -99 SPO 1997 04 13 16 44 36 7.5 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 45 36 7.4 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 46 37 7.3 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 47 37 7.2 -9 673.90 -59.1 -58.9 -59.2 58 -99 SPO 1997 04 13 16 48 37 7.5 -9 673.90 -59.1 -58.9 -59.2 59 -99 SPO 1997 04 13 16 49 37 7.5 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 50 36 7.6 -9 673.90 -59.1 -58.9 -59.2 60 -99 SPO 1997 04 13 16 51 37 7.5 -9 673.80 -59.1 -58.9 -59.2 59 -99 SPO 1997 04 13 16 52 37 7.5 -9 673.80 -59.1 -58.9 -59.2 59 -99 SPO 1997 04 13 16 53 38 7.4 -9 673.80 -59.1 -59.0 -59.2 58 -99 SPO 1997 04 13 16 54 38 7.4 -9 673.80 -59.2 -58.9 -59.3 59 -99 SPO 1997 04 13 16 55 38 7.8 -9 673.80 -59.2 -59.0 -59.2 59 -99 SPO 1997 04 13 16 56 38 7.3 -9 673.80 -59.2 -58.9 -59.2 59 -99 SPO 1997 04 13 16 57 38 7.5 -9 673.80 -59.2 -58.9 -59.2 59 -99 SPO 1997 04 13 16 58 38 7.4 -9 673.80 -59.2 -58.9 -59.2 59 -99 SPO 1997 04 13 16 59 38 7.2 -9 673.80 -59.1 -58.9 -59.2 59 -99 SPO 1997 04 13 17 00 38 7.3 -9 673.80 -59.1 -58.8 -59.2 59 0 SPO 1997 04 13 17 01 37 7.0 -9 673.80 -59.1 -58.8 -59.2 58 -99 SPO 1997 04 13 17 02 37 7.0 -9 673.80 -59.1 -58.8 -59.2 58 -99 SPO 1997 04 13 17 03 36 7.1 -9 673.80 -59.1 -58.8 -59.2 57 -99 SPO 1997 04 13 17 04 37 7.1 -9 673.80 -59.1 -58.8 -59.2 57 -99 SPO 1997 04 13 17 05 37 7.3 -9 673.80 -59.1 -58.8 -59.2 57 -99 SPO 1997 04 13 17 06 36 7.2 -9 673.80 -59.1 -58.8 -59.1 57 -99 SPO 1997 04 13 17 07 36 7.4 -9 673.80 -59.1 -58.8 -59.1 58 -99 SPO 1997 04 13 17 08 36 7.1 -9 673.80 -59.1 -58.8 -59.1 58 -99 SPO 1997 04 13 17 09 36 7.2 -9 673.80 -59.1 -58.8 -59.1 58 -99 SPO 1997 04 13 17 10 37 7.2 -9 673.80 -59.0 -58.8 -59.1 59 -99 SPO 1997 04 13 17 11 37 7.2 -9 673.80 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 13 17 12 36 7.3 -9 673.80 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 13 17 13 36 7.3 -9 673.80 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 13 17 14 35 7.3 -9 673.80 -59.0 -58.7 -59.1 59 -99 SPO 1997 04 13 17 15 35 7.3 -9 673.80 -59.0 -58.6 -59.0 58 -99 SPO 1997 04 13 17 16 35 7.3 -9 673.80 -59.0 -58.6 -59.0 58 -99 SPO 1997 04 13 17 17 34 7.3 -9 673.80 -58.9 -58.6 -59.0 58 -99 SPO 1997 04 13 17 18 34 7.6 -9 673.80 -58.9 -58.6 -59.0 57 -99 SPO 1997 04 13 17 19 34 7.4 -9 673.80 -58.9 -58.6 -59.0 57 -99 SPO 1997 04 13 17 20 34 7.7 -9 673.80 -58.9 -58.6 -58.9 58 -99 SPO 1997 04 13 17 21 34 7.5 -9 673.80 -58.9 -58.5 -58.9 58 -99 SPO 1997 04 13 17 22 33 7.8 -9 673.70 -58.9 -58.4 -58.8 59 -99 SPO 1997 04 13 17 23 33 7.6 -9 673.70 -58.8 -58.4 -58.7 59 -99 SPO 1997 04 13 17 24 34 7.6 -9 673.70 -58.8 -58.4 -58.7 60 -99 SPO 1997 04 13 17 25 34 7.9 -9 673.70 -58.7 -58.4 -58.8 59 -99 SPO 1997 04 13 17 26 33 8.0 -9 673.70 -58.7 -58.4 -58.7 59 -99 SPO 1997 04 13 17 27 33 8.1 -9 673.70 -58.7 -58.4 -58.8 59 -99 SPO 1997 04 13 17 28 32 8.2 -9 673.70 -58.7 -58.4 -58.8 59 -99 SPO 1997 04 13 17 29 31 8.2 -9 673.70 -58.7 -58.3 -58.8 59 -99 SPO 1997 04 13 17 30 31 8.3 -9 673.70 -58.7 -58.3 -58.8 59 -99 SPO 1997 04 13 17 31 31 8.5 -9 673.70 -58.7 -58.3 -58.8 59 -99 SPO 1997 04 13 17 32 32 8.4 -9 673.70 -58.7 -58.3 -58.8 59 -99 SPO 1997 04 13 17 33 32 8.8 -9 673.70 -58.7 -58.2 -58.8 59 -99 SPO 1997 04 13 17 34 31 8.8 -9 673.70 -58.7 -58.3 -58.7 59 -99 SPO 1997 04 13 17 35 32 8.4 -9 673.70 -58.7 -58.3 -58.7 60 -99 SPO 1997 04 13 17 36 32 8.3 -9 673.70 -58.7 -58.3 -58.7 60 -99 SPO 1997 04 13 17 37 33 8.3 -9 673.70 -58.7 -58.3 -58.7 59 -99 SPO 1997 04 13 17 38 32 8.4 -9 673.70 -58.6 -58.3 -58.7 59 -99 SPO 1997 04 13 17 39 33 8.4 -9 673.70 -58.6 -58.3 -58.7 59 -99 SPO 1997 04 13 17 40 33 8.5 -9 673.70 -58.7 -58.3 -58.7 60 -99 SPO 1997 04 13 17 41 34 8.3 -9 673.70 -58.6 -58.2 -58.7 59 -99 SPO 1997 04 13 17 42 33 8.2 -9 673.70 -58.6 -58.1 -58.6 60 -99 SPO 1997 04 13 17 43 33 8.4 -9 673.70 -58.6 -58.1 -58.5 61 -99 SPO 1997 04 13 17 44 34 8.1 -9 673.70 -58.5 -58.1 -58.5 61 -99 SPO 1997 04 13 17 45 35 8.3 -9 673.70 -58.5 -58.2 -58.6 61 -99 SPO 1997 04 13 17 46 36 8.0 -9 673.70 -58.5 -58.3 -58.6 61 -99 SPO 1997 04 13 17 47 37 7.6 -9 673.70 -58.6 -58.3 -58.8 61 -99 SPO 1997 04 13 17 48 37 7.8 -9 673.70 -58.6 -58.3 -58.8 60 -99 SPO 1997 04 13 17 49 37 7.7 -9 673.70 -58.6 -58.3 -58.8 59 -99 SPO 1997 04 13 17 50 37 7.6 -9 673.70 -58.6 -58.3 -58.7 58 -99 SPO 1997 04 13 17 51 36 7.7 -9 673.70 -58.7 -58.4 -58.7 59 -99 SPO 1997 04 13 17 52 36 7.5 -9 673.70 -58.6 -58.3 -58.7 58 -99 SPO 1997 04 13 17 53 35 7.7 -9 673.80 -58.6 -58.2 -58.6 58 -99 SPO 1997 04 13 17 54 35 7.2 -9 673.80 -58.6 -58.3 -58.6 59 -99 SPO 1997 04 13 17 55 35 7.8 -9 673.80 -58.6 -58.4 -58.6 61 -99 SPO 1997 04 13 17 56 37 7.1 -9 673.70 -58.6 -58.4 -58.6 61 -99 SPO 1997 04 13 17 57 38 7.5 -9 673.80 -58.6 -58.5 -58.7 61 -99 SPO 1997 04 13 17 58 39 7.2 -9 673.80 -58.6 -58.4 -58.7 61 -99 SPO 1997 04 13 17 59 39 7.2 -9 673.80 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 13 18 00 39 7.3 -9 673.80 -58.6 -58.3 -58.7 60 0 SPO 1997 04 13 18 01 39 7.0 -9 673.70 -58.6 -58.2 -58.6 60 -99 SPO 1997 04 13 18 02 38 7.2 -9 673.80 -58.5 -58.2 -58.5 59 -99 SPO 1997 04 13 18 03 38 7.8 -9 673.70 -58.5 -58.1 -58.4 59 -99 SPO 1997 04 13 18 04 37 7.3 -9 673.70 -58.4 -58.1 -58.4 59 -99 SPO 1997 04 13 18 05 39 7.6 -9 673.70 -58.4 -58.2 -58.4 59 -99 SPO 1997 04 13 18 06 37 7.6 -9 673.70 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 13 18 07 37 7.3 -9 673.70 -58.4 -58.2 -58.4 61 -99 SPO 1997 04 13 18 08 36 7.3 -9 673.70 -58.4 -58.2 -58.5 61 -99 SPO 1997 04 13 18 09 36 7.3 -9 673.70 -58.4 -58.2 -58.5 61 -99 SPO 1997 04 13 18 10 36 7.5 -9 673.70 -58.4 -58.1 -58.4 61 -99 SPO 1997 04 13 18 11 36 7.8 -9 673.70 -58.4 -58.1 -58.4 61 -99 SPO 1997 04 13 18 12 36 7.3 -9 673.70 -58.3 -58.1 -58.4 60 -99 SPO 1997 04 13 18 13 38 7.3 -9 673.80 -58.3 -58.1 -58.4 59 -99 SPO 1997 04 13 18 14 39 7.0 -9 673.80 -58.3 -58.2 -58.4 59 -99 SPO 1997 04 13 18 15 39 6.8 -9 673.80 -58.3 -58.2 -58.4 59 -99 SPO 1997 04 13 18 16 39 6.9 -9 673.80 -58.3 -58.1 -58.4 60 -99 SPO 1997 04 13 18 17 40 7.0 -9 673.80 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 13 18 18 38 7.2 -9 673.80 -58.3 -57.9 -58.3 61 -99 SPO 1997 04 13 18 19 38 7.4 -9 673.70 -58.2 -57.8 -58.2 61 -99 SPO 1997 04 13 18 20 37 7.3 -9 673.80 -58.2 -57.7 -58.1 61 -99 SPO 1997 04 13 18 21 37 7.5 -9 673.80 -58.1 -57.6 -58.0 60 -99 SPO 1997 04 13 18 22 35 7.8 -9 673.70 -58.0 -57.6 -57.9 60 -99 SPO 1997 04 13 18 23 37 7.5 -9 673.80 -57.9 -57.8 -57.9 60 -99 SPO 1997 04 13 18 24 37 7.6 -9 673.80 -57.9 -57.8 -58.0 60 -99 SPO 1997 04 13 18 25 38 7.1 -9 673.70 -58.0 -57.9 -58.1 61 -99 SPO 1997 04 13 18 26 38 7.1 -9 673.70 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 13 18 27 39 7.0 -9 673.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 13 18 28 40 6.7 -9 673.70 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 13 18 29 41 6.6 -9 673.70 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 13 18 30 40 6.9 -9 673.70 -58.0 -57.7 -58.1 62 -99 SPO 1997 04 13 18 31 41 6.9 -9 673.70 -58.0 -57.6 -58.0 62 -99 SPO 1997 04 13 18 32 39 7.0 -9 673.70 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 18 33 39 7.3 -9 673.60 -57.9 -57.5 -57.9 61 -99 SPO 1997 04 13 18 34 38 7.6 -9 673.70 -57.9 -57.4 -57.9 61 -99 SPO 1997 04 13 18 35 36 7.5 -9 673.60 -57.8 -57.4 -57.8 60 -99 SPO 1997 04 13 18 36 35 7.4 -9 673.60 -57.8 -57.3 -57.7 60 -99 SPO 1997 04 13 18 37 37 7.7 -9 673.60 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 13 18 38 36 7.6 -9 673.60 -57.7 -57.5 -57.8 59 -99 SPO 1997 04 13 18 39 37 7.7 -9 673.60 -57.8 -57.6 -57.9 61 -99 SPO 1997 04 13 18 40 37 7.4 -9 673.60 -57.8 -57.5 -57.9 61 -99 SPO 1997 04 13 18 41 37 7.5 -9 673.60 -57.8 -57.5 -57.9 62 -99 SPO 1997 04 13 18 42 40 7.5 -9 673.60 -57.8 -57.5 -57.9 62 -99 SPO 1997 04 13 18 43 37 7.6 -9 673.60 -57.8 -57.4 -57.9 62 -99 SPO 1997 04 13 18 44 36 7.3 -9 673.60 -57.8 -57.4 -57.9 62 -99 SPO 1997 04 13 18 45 37 7.6 -9 673.60 -57.8 -57.4 -57.9 62 -99 SPO 1997 04 13 18 46 36 7.5 -9 673.50 -57.8 -57.5 -57.9 62 -99 SPO 1997 04 13 18 47 37 7.4 -9 673.50 -57.8 -57.4 -57.9 61 -99 SPO 1997 04 13 18 48 36 7.8 -9 673.50 -57.8 -57.4 -57.9 61 -99 SPO 1997 04 13 18 49 36 7.7 -9 673.50 -57.8 -57.4 -57.9 62 -99 SPO 1997 04 13 18 50 36 7.4 -9 673.50 -57.8 -57.5 -58.0 62 -99 SPO 1997 04 13 18 51 36 7.3 -9 673.50 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 13 18 52 36 7.3 -9 673.50 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 13 18 53 36 7.4 -9 673.50 -57.9 -57.6 -58.0 62 -99 SPO 1997 04 13 18 54 36 7.1 -9 673.50 -57.9 -57.6 -58.0 62 -99 SPO 1997 04 13 18 55 36 7.2 -9 673.50 -57.9 -57.6 -58.0 62 -99 SPO 1997 04 13 18 56 36 7.3 -9 673.50 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 18 57 36 7.2 -9 673.50 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 18 58 36 7.2 -9 673.50 -57.9 -57.6 -57.9 60 -99 SPO 1997 04 13 18 59 36 7.2 -9 673.50 -57.9 -57.6 -57.9 60 -99 SPO 1997 04 13 19 00 36 7.2 -9 673.50 -57.9 -57.5 -58.0 60 0 SPO 1997 04 13 19 01 36 7.1 -9 673.50 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 19 02 35 7.0 -9 673.50 -57.9 -57.5 -58.0 61 -99 SPO 1997 04 13 19 03 36 7.2 -9 673.50 -57.9 -57.5 -57.9 61 -99 SPO 1997 04 13 19 04 37 7.2 -9 673.50 -57.8 -57.5 -57.9 61 -99 SPO 1997 04 13 19 05 37 7.3 -9 673.50 -57.8 -57.5 -57.9 61 -99 SPO 1997 04 13 19 06 37 7.3 -9 673.50 -57.9 -57.5 -57.9 62 -99 SPO 1997 04 13 19 07 35 7.2 -9 673.50 -57.9 -57.5 -57.9 62 -99 SPO 1997 04 13 19 08 35 7.0 -9 673.50 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 19 09 35 7.1 -9 673.50 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 19 10 34 7.3 -9 673.50 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 19 11 34 7.0 -9 673.50 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 19 12 33 7.1 -9 673.50 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 19 13 33 6.9 -9 673.50 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 19 14 33 7.1 -9 673.50 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 19 15 33 7.0 -9 673.50 -57.9 -57.6 -57.9 60 -99 SPO 1997 04 13 19 16 32 7.4 -9 673.50 -57.8 -57.6 -57.9 60 -99 SPO 1997 04 13 19 17 33 7.3 -9 673.40 -57.8 -57.5 -57.9 60 -99 SPO 1997 04 13 19 18 33 7.3 -9 673.40 -57.8 -57.5 -57.8 60 -99 SPO 1997 04 13 19 19 32 7.6 -9 673.40 -57.8 -57.5 -57.8 60 -99 SPO 1997 04 13 19 20 32 7.5 -9 673.40 -57.8 -57.5 -57.8 60 -99 SPO 1997 04 13 19 21 33 7.1 -9 673.40 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 13 19 22 31 7.6 -9 673.40 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 13 19 23 30 7.7 -9 673.40 -57.7 -57.3 -57.6 59 -99 SPO 1997 04 13 19 24 30 7.3 -9 673.40 -57.6 -57.3 -57.6 59 -99 SPO 1997 04 13 19 25 29 7.8 -9 673.40 -57.6 -57.3 -57.6 62 -99 SPO 1997 04 13 19 26 27 7.6 -9 673.40 -57.5 -57.3 -57.5 62 -99 SPO 1997 04 13 19 27 27 7.4 -9 673.40 -57.5 -57.3 -57.5 62 -99 SPO 1997 04 13 19 28 26 7.9 -9 673.40 -57.4 -57.3 -57.5 62 -99 SPO 1997 04 13 19 29 27 7.7 -9 673.40 -57.4 -57.3 -57.5 62 -99 SPO 1997 04 13 19 30 26 7.4 -9 673.40 -57.4 -57.3 -57.5 62 -99 SPO 1997 04 13 19 31 26 7.6 -9 673.40 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 13 19 32 25 7.6 -9 673.40 -57.4 -57.3 -57.5 60 -99 SPO 1997 04 13 19 33 26 7.5 -9 673.40 -57.4 -57.3 -57.6 60 -99 SPO 1997 04 13 19 34 27 7.7 -9 673.40 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 13 19 35 27 7.6 -9 673.40 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 13 19 36 27 7.4 -9 673.40 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 13 19 37 27 7.5 -9 673.40 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 13 19 38 26 7.5 -9 673.40 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 13 19 39 26 7.5 -9 673.40 -57.4 -57.1 -57.5 62 -99 SPO 1997 04 13 19 40 26 7.5 -9 673.40 -57.4 -57.2 -57.5 62 -99 SPO 1997 04 13 19 41 26 7.6 -9 673.40 -57.4 -57.2 -57.5 62 -99 SPO 1997 04 13 19 42 26 7.8 -9 673.40 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 13 19 43 26 8.0 -9 673.40 -57.4 -57.2 -57.4 61 -99 SPO 1997 04 13 19 44 25 7.7 -9 673.40 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 13 19 45 25 7.8 -9 673.40 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 13 19 46 25 7.5 -9 673.40 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 13 19 47 25 7.5 -9 673.40 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 13 19 48 26 7.6 -9 673.30 -57.4 -57.1 -57.5 62 -99 SPO 1997 04 13 19 49 26 7.6 -9 673.30 -57.4 -57.1 -57.5 62 -99 SPO 1997 04 13 19 50 27 7.4 -9 673.30 -57.4 -57.2 -57.6 62 -99 SPO 1997 04 13 19 51 27 7.3 -9 673.30 -57.5 -57.2 -57.6 63 -99 SPO 1997 04 13 19 52 26 7.4 -9 673.30 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 13 19 53 25 7.8 -9 673.30 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 13 19 54 24 7.9 -9 673.30 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 13 19 55 24 8.2 -9 673.30 -57.5 -57.1 -57.6 59 -99 SPO 1997 04 13 19 56 24 8.5 -9 673.30 -57.5 -57.1 -57.6 59 -99 SPO 1997 04 13 19 57 24 8.4 -9 673.30 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 13 19 58 25 8.5 -9 673.20 -57.6 -57.2 -57.6 62 -99 SPO 1997 04 13 19 59 25 8.8 -9 673.20 -57.6 -57.2 -57.6 62 -99 SPO 1997 04 13 20 00 25 8.5 -9 673.20 -57.5 -57.2 -57.6 61 0 SPO 1997 04 13 20 01 25 8.1 -9 673.20 -57.6 -57.2 -57.7 63 -99 SPO 1997 04 13 20 02 26 8.3 -9 673.30 -57.6 -57.3 -57.7 62 -99 SPO 1997 04 13 20 03 27 8.3 -9 673.30 -57.6 -57.2 -57.8 62 -99 SPO 1997 04 13 20 04 27 8.3 -9 673.30 -57.7 -57.3 -57.8 63 -99 SPO 1997 04 13 20 05 27 8.3 -9 673.30 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 13 20 06 28 8.2 -9 673.30 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 13 20 07 28 8.2 -9 673.20 -57.7 -57.2 -57.8 60 -99 SPO 1997 04 13 20 08 27 8.5 -9 673.20 -57.7 -57.2 -57.8 59 -99 SPO 1997 04 13 20 09 28 8.7 -9 673.20 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 13 20 10 27 8.6 -9 673.20 -57.7 -57.2 -57.8 60 -99 SPO 1997 04 13 20 11 27 8.7 -9 673.20 -57.7 -57.2 -57.8 61 -99 SPO 1997 04 13 20 12 26 8.7 -9 673.20 -57.7 -57.2 -57.8 61 -99 SPO 1997 04 13 20 13 26 8.7 -9 673.20 -57.7 -57.3 -57.8 63 -99 SPO 1997 04 13 20 14 27 8.3 -9 673.20 -57.7 -57.3 -57.8 63 -99 SPO 1997 04 13 20 15 27 8.6 -9 673.20 -57.7 -57.3 -57.8 61 -99 SPO 1997 04 13 20 16 27 8.2 -9 673.20 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 13 20 17 27 8.6 -9 673.20 -57.8 -57.4 -57.8 61 -99 SPO 1997 04 13 20 18 28 8.3 -9 673.20 -57.8 -57.4 -57.8 60 -99 SPO 1997 04 13 20 19 29 8.1 -9 673.20 -57.8 -57.4 -57.9 59 -99 SPO 1997 04 13 20 20 30 8.0 -9 673.20 -57.8 -57.4 -58.0 59 -99 SPO 1997 04 13 20 21 30 8.0 -9 673.20 -57.8 -57.4 -58.0 59 -99 SPO 1997 04 13 20 22 30 8.0 -9 673.20 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 20 23 30 8.2 -9 673.20 -57.9 -57.3 -58.0 61 -99 SPO 1997 04 13 20 24 29 8.2 -9 673.20 -57.9 -57.3 -58.0 61 -99 SPO 1997 04 13 20 25 30 8.3 -9 673.20 -57.9 -57.3 -57.8 62 -99 SPO 1997 04 13 20 26 30 8.3 -9 673.20 -57.9 -57.3 -57.9 62 -99 SPO 1997 04 13 20 27 30 8.3 -9 673.20 -57.8 -57.4 -58.0 60 -99 SPO 1997 04 13 20 28 31 8.3 -9 673.20 -57.8 -57.4 -57.9 60 -99 SPO 1997 04 13 20 29 31 8.7 -9 673.20 -57.9 -57.5 -57.9 60 -99 SPO 1997 04 13 20 30 31 8.5 -9 673.20 -57.9 -57.6 -58.0 61 -99 SPO 1997 04 13 20 31 32 8.6 -9 673.20 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 20 32 32 8.4 -9 673.20 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 20 33 32 8.3 -9 673.20 -58.0 -57.6 -58.1 61 -99 SPO 1997 04 13 20 34 32 8.4 -9 673.20 -58.0 -57.5 -58.1 61 -99 SPO 1997 04 13 20 35 33 8.1 -9 673.20 -58.0 -57.5 -58.1 61 -99 SPO 1997 04 13 20 36 33 8.2 -9 673.20 -58.0 -57.5 -58.1 61 -99 SPO 1997 04 13 20 37 33 8.1 -9 673.20 -58.0 -57.5 -58.1 61 -99 SPO 1997 04 13 20 38 32 8.1 -9 673.20 -58.0 -57.5 -58.1 61 -99 SPO 1997 04 13 20 39 32 8.3 -9 673.20 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 13 20 40 32 8.6 -9 673.20 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 20 41 32 8.5 -9 673.20 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 20 42 31 8.7 -9 673.10 -58.0 -57.4 -58.0 59 -99 SPO 1997 04 13 20 43 32 8.8 -9 673.10 -58.0 -57.3 -58.0 59 -99 SPO 1997 04 13 20 44 31 9.0 -9 673.10 -57.9 -57.4 -58.0 59 -99 SPO 1997 04 13 20 45 32 8.8 -9 673.10 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 20 46 31 8.7 -9 673.10 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 20 47 31 8.8 -9 673.10 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 20 48 31 8.8 -9 673.10 -57.9 -57.4 -58.0 61 -99 SPO 1997 04 13 20 49 30 8.8 -9 673.10 -57.9 -57.4 -58.0 61 -99 SPO 1997 04 13 20 50 30 8.8 -9 673.10 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 20 51 31 8.9 -9 673.10 -58.0 -57.5 -58.0 61 -99 SPO 1997 04 13 20 52 31 8.8 -9 673.10 -58.0 -57.5 -58.1 60 -99 SPO 1997 04 13 20 53 31 8.8 -9 673.10 -58.0 -57.5 -58.1 60 -99 SPO 1997 04 13 20 54 32 8.7 -9 673.10 -58.0 -57.4 -58.1 59 -99 SPO 1997 04 13 20 55 32 8.9 -9 673.10 -58.0 -57.4 -58.2 59 -99 SPO 1997 04 13 20 56 32 9.0 -9 673.00 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 13 20 57 32 9.1 -9 673.00 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 20 58 32 8.9 -9 673.00 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 20 59 32 8.8 -9 673.10 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 21 00 32 9.0 -9 673.10 -58.0 -57.4 -58.0 61 0 SPO 1997 04 13 21 01 31 8.9 -9 673.10 -57.9 -57.4 -57.9 60 -99 SPO 1997 04 13 21 02 32 8.7 -9 673.10 -57.9 -57.4 -57.8 60 -99 SPO 1997 04 13 21 03 32 8.9 -9 673.10 -57.8 -57.4 -57.9 59 -99 SPO 1997 04 13 21 04 33 8.7 -9 673.10 -57.8 -57.5 -58.0 59 -99 SPO 1997 04 13 21 05 33 8.8 -9 673.10 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 06 33 8.7 -9 673.10 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 07 33 8.7 -9 673.10 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 21 08 33 8.8 -9 673.10 -57.9 -57.4 -57.9 60 -99 SPO 1997 04 13 21 09 32 9.3 -9 673.10 -57.8 -57.3 -57.8 60 -99 SPO 1997 04 13 21 10 33 9.3 -9 673.10 -57.8 -57.3 -57.8 60 -99 SPO 1997 04 13 21 11 33 9.0 -9 673.10 -57.8 -57.4 -57.9 60 -99 SPO 1997 04 13 21 12 33 8.7 -9 673.10 -57.8 -57.5 -57.9 60 -99 SPO 1997 04 13 21 13 34 8.8 -9 673.10 -57.8 -57.5 -58.0 59 -99 SPO 1997 04 13 21 14 33 9.1 -9 673.10 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 15 32 8.8 -9 673.10 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 16 33 9.0 -9 673.00 -57.9 -57.6 -58.0 59 -99 SPO 1997 04 13 21 17 32 8.8 -9 673.10 -57.9 -57.6 -58.0 59 -99 SPO 1997 04 13 21 18 32 9.1 -9 673.00 -57.9 -57.6 -58.0 59 -99 SPO 1997 04 13 21 19 32 8.8 -9 673.00 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 13 21 20 32 8.8 -9 673.10 -58.0 -57.6 -58.0 61 -99 SPO 1997 04 13 21 21 32 8.7 -9 673.10 -58.0 -57.5 -58.0 61 -99 SPO 1997 04 13 21 22 31 9.2 -9 673.00 -58.0 -57.4 -58.0 61 -99 SPO 1997 04 13 21 23 31 9.1 -9 673.00 -57.9 -57.4 -57.9 60 -99 SPO 1997 04 13 21 24 31 8.9 -9 673.00 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 13 21 25 31 9.0 -9 673.00 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 21 26 31 8.8 -9 673.00 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 27 30 8.8 -9 673.00 -57.9 -57.4 -58.0 59 -99 SPO 1997 04 13 21 28 30 9.1 -9 673.00 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 21 29 30 8.9 -9 673.00 -58.0 -57.4 -58.0 60 -99 SPO 1997 04 13 21 30 30 8.9 -9 673.00 -57.9 -57.4 -58.0 59 -99 SPO 1997 04 13 21 31 30 8.9 -9 673.00 -57.9 -57.4 -58.0 59 -99 SPO 1997 04 13 21 32 30 8.8 -9 673.00 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 21 33 30 8.8 -9 673.00 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 21 34 30 8.6 -9 673.00 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 13 21 35 31 8.7 -9 673.00 -57.9 -57.5 -58.0 59 -99 SPO 1997 04 13 21 36 32 8.8 -9 673.00 -57.9 -57.4 -57.9 59 -99 SPO 1997 04 13 21 37 31 8.4 -9 673.10 -57.9 -57.4 -57.9 59 -99 SPO 1997 04 13 21 38 31 8.6 -9 673.10 -57.9 -57.4 -57.9 59 -99 SPO 1997 04 13 21 39 32 8.7 -9 673.10 -57.8 -57.3 -57.8 59 -99 SPO 1997 04 13 21 40 31 8.7 -9 673.00 -57.8 -57.3 -57.8 60 -99 SPO 1997 04 13 21 41 31 8.4 -9 673.00 -57.8 -57.3 -57.8 61 -99 SPO 1997 04 13 21 42 31 8.6 -9 673.00 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 13 21 43 31 8.8 -9 673.00 -57.7 -57.3 -57.7 61 -99 SPO 1997 04 13 21 44 31 8.4 -9 673.00 -57.7 -57.3 -57.7 63 -99 SPO 1997 04 13 21 45 31 8.7 -9 673.00 -57.7 -57.3 -57.7 61 -99 SPO 1997 04 13 21 46 31 8.7 -9 673.00 -57.6 -57.3 -57.6 59 -99 SPO 1997 04 13 21 47 32 8.3 -9 673.00 -57.6 -57.3 -57.6 59 -99 SPO 1997 04 13 21 48 31 8.4 -9 673.00 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 13 21 49 32 8.5 -9 673.00 -57.6 -57.4 -57.6 59 -99 SPO 1997 04 13 21 50 32 8.9 -9 673.00 -57.6 -57.4 -57.6 59 -99 SPO 1997 04 13 21 51 32 8.7 -9 673.00 -57.6 -57.4 -57.6 60 -99 SPO 1997 04 13 21 52 32 9.0 -9 673.00 -57.6 -57.3 -57.6 62 -99 SPO 1997 04 13 21 53 31 8.8 -9 673.00 -57.5 -57.2 -57.5 62 -99 SPO 1997 04 13 21 54 30 8.8 -9 672.90 -57.5 -57.2 -57.5 63 -99 SPO 1997 04 13 21 55 31 9.0 -9 673.00 -57.4 -57.2 -57.5 62 -99 SPO 1997 04 13 21 56 31 9.1 -9 673.00 -57.4 -57.2 -57.4 62 -99 SPO 1997 04 13 21 57 30 8.8 -9 673.00 -57.4 -57.1 -57.4 62 -99 SPO 1997 04 13 21 58 30 9.1 -9 673.00 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 13 21 59 29 9.1 -9 673.00 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 13 22 00 28 8.8 -9 673.00 -57.3 -57.0 -57.3 61 0 SPO 1997 04 13 22 01 29 8.8 -9 673.00 -57.3 -57.0 -57.4 61 -99 SPO 1997 04 13 22 02 29 8.7 -9 673.00 -57.3 -57.0 -57.3 61 -99 SPO 1997 04 13 22 03 30 9.0 -9 673.00 -57.2 -57.0 -57.2 61 -99 SPO 1997 04 13 22 04 30 9.2 -9 673.00 -57.2 -57.1 -57.2 62 -99 SPO 1997 04 13 22 05 29 9.0 -9 673.00 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 13 22 06 29 8.9 -9 673.00 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 13 22 07 30 8.5 -9 673.00 -57.2 -57.1 -57.4 62 -99 SPO 1997 04 13 22 08 31 8.8 -9 673.00 -57.2 -57.2 -57.4 62 -99 SPO 1997 04 13 22 09 30 8.9 -9 673.00 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 13 22 10 31 8.6 -9 673.00 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 13 22 11 31 9.1 -9 673.00 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 13 22 12 32 8.6 -9 673.00 -57.2 -57.2 -57.4 61 -99 SPO 1997 04 13 22 13 31 8.3 -9 673.00 -57.2 -57.1 -57.4 61 -99 SPO 1997 04 13 22 14 30 8.9 -9 673.00 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 13 22 15 31 9.0 -9 673.00 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 13 22 16 33 8.9 -9 673.00 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 13 22 17 33 8.8 -9 672.90 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 13 22 18 32 9.1 -9 672.90 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 13 22 19 31 8.8 -9 672.90 -57.1 -57.1 -57.2 62 -99 SPO 1997 04 13 22 20 30 9.1 -9 672.90 -57.1 -57.1 -57.2 62 -99 SPO 1997 04 13 22 21 30 8.9 -9 672.90 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 13 22 22 29 9.5 -9 672.90 -57.0 -56.8 -57.0 60 -99 SPO 1997 04 13 22 23 29 8.9 -9 672.90 -56.9 -56.9 -57.0 60 -99 SPO 1997 04 13 22 24 30 9.1 -9 672.90 -57.0 -57.0 -57.2 61 -99 SPO 1997 04 13 22 25 31 8.9 -9 672.90 -57.0 -57.1 -57.2 61 -99 SPO 1997 04 13 22 26 30 9.6 -9 672.90 -57.1 -57.1 -57.2 63 -99 SPO 1997 04 13 22 27 31 9.2 -9 672.90 -57.1 -57.1 -57.2 63 -99 SPO 1997 04 13 22 28 30 9.2 -9 672.90 -57.1 -57.1 -57.2 63 -99 SPO 1997 04 13 22 29 30 9.0 -9 672.90 -57.1 -57.0 -57.2 63 -99 SPO 1997 04 13 22 30 29 9.1 -9 672.90 -57.0 -56.9 -57.1 63 -99 SPO 1997 04 13 22 31 28 9.5 -9 672.90 -57.0 -56.8 -57.0 63 -99 SPO 1997 04 13 22 32 28 9.6 -9 672.90 -56.9 -56.7 -56.8 62 -99 SPO 1997 04 13 22 33 28 10.0 -9 672.90 -56.9 -56.6 -56.8 62 -99 SPO 1997 04 13 22 34 28 10.0 -9 672.80 -56.8 -56.7 -56.8 62 -99 SPO 1997 04 13 22 35 28 10.2 -9 672.80 -56.8 -56.7 -56.8 62 -99 SPO 1997 04 13 22 36 28 9.9 -9 672.80 -56.7 -56.8 -56.9 62 -99 SPO 1997 04 13 22 37 28 9.7 -9 672.80 -56.8 -56.9 -57.0 64 -99 SPO 1997 04 13 22 38 29 9.7 -9 672.90 -56.8 -57.0 -57.0 64 -99 SPO 1997 04 13 22 39 29 9.8 -9 672.80 -56.9 -56.9 -57.0 63 -99 SPO 1997 04 13 22 40 30 9.2 -9 672.80 -56.8 -56.9 -57.0 63 -99 SPO 1997 04 13 22 41 30 9.4 -9 672.80 -56.9 -56.9 -57.0 63 -99 SPO 1997 04 13 22 42 29 9.1 -9 672.80 -56.9 -56.8 -57.0 63 -99 SPO 1997 04 13 22 43 28 9.3 -9 672.80 -56.9 -56.7 -56.9 63 -99 SPO 1997 04 13 22 44 28 9.8 -9 672.80 -56.8 -56.6 -56.7 62 -99 SPO 1997 04 13 22 45 28 9.3 -9 672.80 -56.7 -56.6 -56.7 61 -99 SPO 1997 04 13 22 46 28 9.5 -9 672.80 -56.7 -56.6 -56.7 61 -99 SPO 1997 04 13 22 47 28 9.7 -9 672.80 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 13 22 48 29 9.1 -9 672.80 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 13 22 49 28 9.1 -9 672.80 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 13 22 50 27 9.2 -9 672.80 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 13 22 51 28 9.0 -9 672.80 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 13 22 52 27 9.3 -9 672.80 -56.6 -56.6 -56.8 62 -99 SPO 1997 04 13 22 53 26 9.3 -9 672.80 -56.7 -56.5 -56.6 63 -99 SPO 1997 04 13 22 54 25 9.4 -9 672.80 -56.6 -56.5 -56.6 62 -99 SPO 1997 04 13 22 55 27 8.8 -9 672.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 13 22 56 26 9.4 -9 672.90 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 13 22 57 27 8.6 -9 672.90 -56.5 -56.6 -56.8 61 -99 SPO 1997 04 13 22 58 26 8.7 -9 672.90 -56.6 -56.6 -56.8 62 -99 SPO 1997 04 13 22 59 27 9.0 -9 672.90 -56.6 -56.6 -56.8 62 -99 SPO 1997 04 13 23 00 26 9.0 -9 672.90 -56.7 -56.6 -56.8 64 0 SPO 1997 04 13 23 01 26 8.8 -9 672.90 -56.7 -56.6 -56.8 64 -99 SPO 1997 04 13 23 02 26 8.8 -9 672.90 -56.7 -56.6 -56.8 64 -99 SPO 1997 04 13 23 03 27 8.5 -9 672.90 -56.7 -56.6 -56.8 64 -99 SPO 1997 04 13 23 04 26 8.6 -9 672.80 -56.7 -56.5 -56.8 64 -99 SPO 1997 04 13 23 05 25 9.4 -9 672.80 -56.6 -56.4 -56.6 62 -99 SPO 1997 04 13 23 06 26 8.9 -9 672.80 -56.6 -56.5 -56.6 62 -99 SPO 1997 04 13 23 07 27 9.4 -9 672.80 -56.6 -56.5 -56.6 62 -99 SPO 1997 04 13 23 08 25 8.8 -9 672.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 13 23 09 24 9.3 -9 672.80 -56.6 -56.5 -56.6 62 -99 SPO 1997 04 13 23 10 24 9.2 -9 672.80 -56.6 -56.4 -56.6 62 -99 SPO 1997 04 13 23 11 24 8.8 -9 672.80 -56.6 -56.4 -56.6 63 -99 SPO 1997 04 13 23 12 25 8.7 -9 672.80 -56.6 -56.5 -56.7 64 -99 SPO 1997 04 13 23 13 25 8.6 -9 672.80 -56.5 -56.5 -56.7 63 -99 SPO 1997 04 13 23 14 24 9.0 -9 672.80 -56.6 -56.5 -56.7 63 -99 SPO 1997 04 13 23 15 24 9.1 -9 672.80 -56.6 -56.5 -56.7 63 -99 SPO 1997 04 13 23 16 24 9.0 -9 672.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 13 23 17 24 8.9 -9 672.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 13 23 18 24 9.0 -9 672.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 13 23 19 24 9.7 -9 672.80 -56.6 -56.4 -56.6 61 -99 SPO 1997 04 13 23 20 24 9.8 -9 672.70 -56.6 -56.4 -56.6 61 -99 SPO 1997 04 13 23 21 23 9.7 -9 672.70 -56.6 -56.4 -56.6 61 -99 SPO 1997 04 13 23 22 23 9.8 -9 672.70 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 13 23 23 22 9.6 -9 672.70 -56.6 -56.5 -56.7 63 -99 SPO 1997 04 13 23 24 22 9.7 -9 672.70 -56.6 -56.5 -56.8 63 -99 SPO 1997 04 13 23 25 21 10.5 -9 672.70 -56.6 -56.4 -56.6 64 -99 SPO 1997 04 13 23 26 22 10.1 -9 672.70 -56.6 -56.4 -56.6 64 -99 SPO 1997 04 13 23 27 23 9.7 -9 672.70 -56.7 -56.6 -56.8 64 -99 SPO 1997 04 13 23 28 24 9.7 -9 672.60 -56.6 -56.6 -56.8 62 -99 SPO 1997 04 13 23 29 22 10.0 -9 672.60 -56.6 -56.6 -56.9 61 -99 SPO 1997 04 13 23 30 22 10.2 -9 672.60 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 13 23 31 22 10.4 -9 672.60 -56.7 -56.5 -56.9 61 -99 SPO 1997 04 13 23 32 22 10.1 -9 672.60 -56.7 -56.5 -56.8 61 -99 SPO 1997 04 13 23 33 23 10.1 -9 672.60 -56.7 -56.5 -56.8 61 -99 SPO 1997 04 13 23 34 22 10.8 -9 672.60 -56.7 -56.5 -56.8 61 -99 SPO 1997 04 13 23 35 23 10.6 -9 672.60 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 13 23 36 23 10.6 -9 672.60 -56.8 -56.6 -57.0 62 -99 SPO 1997 04 13 23 37 22 10.3 -9 672.60 -56.8 -56.7 -57.0 61 -99 SPO 1997 04 13 23 38 22 10.4 -9 672.60 -56.9 -56.8 -57.1 61 -99 SPO 1997 04 13 23 39 22 10.3 -9 672.60 -56.9 -56.8 -57.1 60 -99 SPO 1997 04 13 23 40 21 10.8 -9 672.50 -56.9 -56.8 -57.1 60 -99 SPO 1997 04 13 23 41 22 10.6 -9 672.50 -56.9 -56.7 -57.0 60 -99 SPO 1997 04 13 23 42 22 10.6 -9 672.50 -56.9 -56.8 -57.1 60 -99 SPO 1997 04 13 23 43 22 10.8 -9 672.60 -56.9 -56.9 -57.1 60 -99 SPO 1997 04 13 23 44 22 10.2 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 13 23 45 22 10.4 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 13 23 46 23 10.2 -9 672.60 -57.0 -56.9 -57.2 62 -99 SPO 1997 04 13 23 47 22 10.4 -9 672.50 -57.0 -56.9 -57.2 62 -99 SPO 1997 04 13 23 48 23 10.4 -9 672.50 -57.1 -56.9 -57.2 63 -99 SPO 1997 04 13 23 49 23 10.3 -9 672.50 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 13 23 50 23 10.2 -9 672.50 -57.1 -56.8 -57.2 63 -99 SPO 1997 04 13 23 51 23 10.9 -9 672.50 -57.1 -56.8 -57.1 62 -99 SPO 1997 04 13 23 52 23 10.8 -9 672.50 -57.0 -56.7 -57.0 61 -99 SPO 1997 04 13 23 53 23 10.6 -9 672.50 -57.0 -56.7 -57.0 61 -99 SPO 1997 04 13 23 54 23 10.2 -9 672.50 -57.0 -56.7 -57.0 61 -99 SPO 1997 04 13 23 55 23 10.7 -9 672.50 -57.0 -56.7 -57.0 61 -99 SPO 1997 04 13 23 56 23 10.4 -9 672.50 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 13 23 57 24 10.8 -9 672.50 -56.9 -56.9 -57.1 -99 -99 SPO 1997 04 13 23 58 24 10.7 -9 672.50 -56.9 -56.9 -57.2 -99 -99 SPO 1997 04 13 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 14 00 00 26 9.9 -9 672.50 -57.0 -56.9 -57.2 -99 0 SPO 1997 04 14 00 01 25 10.3 -9 672.50 -57.1 -56.9 -57.2 -99 -99 SPO 1997 04 14 00 02 25 10.2 -9 672.50 -57.1 -56.8 -57.2 -99 -99 SPO 1997 04 14 00 03 25 10.3 -9 672.50 -57.0 -56.8 -57.1 -99 -99 SPO 1997 04 14 00 04 26 10.0 -9 672.60 -57.0 -56.9 -57.2 -99 -99 SPO 1997 04 14 00 05 27 10.0 -9 672.60 -57.1 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 06 27 9.9 -9 672.60 -57.1 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 07 27 9.7 -9 672.60 -57.1 -57.0 -57.3 -99 -99 SPO 1997 04 14 00 08 28 9.5 -9 672.60 -57.1 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 09 27 9.9 -9 672.60 -57.1 -57.0 -57.3 -99 -99 SPO 1997 04 14 00 10 27 9.8 -9 672.60 -57.1 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 11 26 9.7 -9 672.60 -57.2 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 12 26 9.8 -9 672.60 -57.1 -57.0 -57.2 -99 -99 SPO 1997 04 14 00 13 26 9.8 -9 672.60 -57.0 -57.0 -57.2 61 -99 SPO 1997 04 14 00 14 26 9.2 -9 672.60 -57.0 -57.0 -57.2 61 -99 SPO 1997 04 14 00 15 27 9.8 -9 672.60 -57.1 -57.1 -57.3 61 -99 SPO 1997 04 14 00 16 28 9.9 -9 672.60 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 14 00 17 28 9.2 -9 672.60 -57.1 -57.1 -57.3 61 -99 SPO 1997 04 14 00 18 28 9.3 -9 672.60 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 14 00 19 28 9.3 -9 672.60 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 14 00 20 28 9.5 -9 672.60 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 14 00 21 28 9.3 -9 672.60 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 14 00 22 28 9.1 -9 672.60 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 14 00 23 29 9.2 -9 672.60 -57.2 -57.0 -57.2 63 -99 SPO 1997 04 14 00 24 29 9.2 -9 672.70 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 00 25 28 9.1 -9 672.70 -57.1 -56.9 -57.1 60 -99 SPO 1997 04 14 00 26 28 9.2 -9 672.70 -57.1 -56.9 -57.1 60 -99 SPO 1997 04 14 00 27 29 9.1 -9 672.70 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 14 00 28 29 9.0 -9 672.70 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 14 00 29 29 8.4 -9 672.70 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 14 00 30 30 8.8 -9 672.70 -57.0 -57.1 -57.2 60 -99 SPO 1997 04 14 00 31 29 9.0 -9 672.70 -57.1 -57.1 -57.3 61 -99 SPO 1997 04 14 00 32 29 8.8 -9 672.70 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 14 00 33 29 9.2 -9 672.70 -57.1 -57.0 -57.2 62 -99 SPO 1997 04 14 00 34 29 8.8 -9 672.70 -57.1 -57.0 -57.3 62 -99 SPO 1997 04 14 00 35 28 9.3 -9 672.70 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 14 00 36 29 8.8 -9 672.70 -57.2 -57.1 -57.2 62 -99 SPO 1997 04 14 00 37 29 9.0 -9 672.60 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 14 00 38 29 9.0 -9 672.60 -57.2 -57.1 -57.4 60 -99 SPO 1997 04 14 00 39 29 9.0 -9 672.60 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 14 00 40 28 8.9 -9 672.60 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 00 41 28 8.9 -9 672.60 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 00 42 27 9.2 -9 672.60 -57.2 -57.0 -57.2 60 -99 SPO 1997 04 14 00 43 26 9.0 -9 672.60 -57.2 -57.0 -57.2 61 -99 SPO 1997 04 14 00 44 25 9.6 -9 672.60 -57.1 -56.9 -57.1 61 -99 SPO 1997 04 14 00 45 27 9.7 -9 672.60 -57.0 -56.9 -57.2 60 -99 SPO 1997 04 14 00 46 27 9.6 -9 672.60 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 14 00 47 27 9.4 -9 672.60 -57.1 -57.1 -57.3 60 -99 SPO 1997 04 14 00 48 27 9.5 -9 672.60 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 14 00 49 27 9.6 -9 672.60 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 00 50 28 9.2 -9 672.50 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 00 51 26 9.8 -9 672.50 -57.2 -56.9 -57.2 60 -99 SPO 1997 04 14 00 52 26 9.9 -9 672.50 -57.2 -56.9 -57.2 61 -99 SPO 1997 04 14 00 53 27 9.9 -9 672.50 -57.1 -56.8 -57.2 61 -99 SPO 1997 04 14 00 54 28 10.1 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 00 55 29 9.6 -9 672.50 -57.1 -56.9 -57.3 61 -99 SPO 1997 04 14 00 56 28 9.4 -9 672.50 -57.2 -56.9 -57.3 62 -99 SPO 1997 04 14 00 57 28 9.6 -9 672.50 -57.2 -56.9 -57.2 62 -99 SPO 1997 04 14 00 58 26 9.9 -9 672.50 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 00 59 26 9.9 -9 672.50 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 01 00 25 10.1 -9 672.50 -57.1 -56.9 -57.1 61 0 SPO 1997 04 14 01 01 26 10.3 -9 672.50 -57.0 -56.9 -57.1 60 -99 SPO 1997 04 14 01 02 27 9.7 -9 672.50 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 14 01 03 27 9.6 -9 672.50 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 14 01 04 27 9.6 -9 672.50 -57.1 -57.0 -57.3 61 -99 SPO 1997 04 14 01 05 26 9.6 -9 672.50 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 14 01 06 26 9.6 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 07 26 9.9 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 08 26 9.9 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 09 26 9.7 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 10 27 9.7 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 11 27 10.0 -9 672.50 -57.1 -56.9 -57.2 61 -99 SPO 1997 04 14 01 12 27 9.5 -9 672.50 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 01 13 26 9.8 -9 672.50 -57.1 -56.8 -57.2 60 -99 SPO 1997 04 14 01 14 26 9.8 -9 672.50 -57.1 -56.8 -57.1 61 -99 SPO 1997 04 14 01 15 25 9.6 -9 672.50 -57.1 -56.9 -57.2 62 -99 SPO 1997 04 14 01 16 25 9.9 -9 672.50 -57.1 -57.0 -57.1 62 -99 SPO 1997 04 14 01 17 25 9.7 -9 672.50 -57.0 -57.0 -57.2 62 -99 SPO 1997 04 14 01 18 26 9.6 -9 672.50 -57.0 -57.0 -57.2 62 -99 SPO 1997 04 14 01 19 26 9.5 -9 672.50 -57.0 -56.9 -57.2 62 -99 SPO 1997 04 14 01 20 25 10.0 -9 672.50 -57.1 -56.9 -57.2 62 -99 SPO 1997 04 14 01 21 25 9.5 -9 672.50 -57.1 -56.9 -57.1 62 -99 SPO 1997 04 14 01 22 25 10.0 -9 672.50 -57.0 -56.8 -57.0 61 -99 SPO 1997 04 14 01 23 26 9.8 -9 672.40 -57.0 -56.8 -57.0 61 -99 SPO 1997 04 14 01 24 26 10.1 -9 672.40 -57.0 -56.8 -57.0 61 -99 SPO 1997 04 14 01 25 27 9.6 -9 672.40 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 01 26 27 9.8 -9 672.40 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 01 27 28 9.5 -9 672.50 -57.0 -56.8 -57.1 63 -99 SPO 1997 04 14 01 28 28 9.1 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 29 27 9.6 -9 672.50 -57.0 -56.8 -57.1 61 -99 SPO 1997 04 14 01 30 26 9.8 -9 672.50 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 01 31 27 9.6 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 32 26 9.5 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 14 01 33 26 9.3 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 14 01 34 26 9.2 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 14 01 35 27 9.1 -9 672.50 -57.0 -56.9 -57.1 60 -99 SPO 1997 04 14 01 36 27 8.9 -9 672.50 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 14 01 37 28 8.9 -9 672.50 -57.0 -57.0 -57.1 61 -99 SPO 1997 04 14 01 38 29 8.8 -9 672.50 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 14 01 39 30 9.2 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 40 30 9.2 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 41 30 9.0 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 42 30 8.9 -9 672.50 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 43 30 8.6 -9 672.50 -57.0 -56.9 -57.2 61 -99 SPO 1997 04 14 01 44 31 8.8 -9 672.50 -57.0 -56.9 -57.2 60 -99 SPO 1997 04 14 01 45 31 8.5 -9 672.50 -57.0 -56.9 -57.1 60 -99 SPO 1997 04 14 01 46 31 8.8 -9 672.50 -57.0 -57.0 -57.2 60 -99 SPO 1997 04 14 01 47 31 9.0 -9 672.50 -57.1 -57.0 -57.1 60 -99 SPO 1997 04 14 01 48 31 8.8 -9 672.50 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 14 01 49 32 8.6 -9 672.50 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 14 01 50 33 8.8 -9 672.50 -56.9 -56.9 -57.1 60 -99 SPO 1997 04 14 01 51 32 8.8 -9 672.40 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 52 32 9.0 -9 672.40 -57.0 -56.9 -57.1 62 -99 SPO 1997 04 14 01 53 32 9.0 -9 672.40 -57.0 -56.9 -57.0 63 -99 SPO 1997 04 14 01 54 32 9.0 -9 672.40 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 01 55 33 9.1 -9 672.40 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 01 56 33 9.0 -9 672.30 -57.0 -56.8 -57.1 61 -99 SPO 1997 04 14 01 57 33 9.2 -9 672.30 -57.0 -56.8 -57.1 61 -99 SPO 1997 04 14 01 58 32 9.3 -9 672.30 -57.0 -56.8 -57.1 60 -99 SPO 1997 04 14 01 59 31 9.5 -9 672.30 -57.0 -56.8 -57.0 60 -99 SPO 1997 04 14 02 00 31 9.4 -9 672.20 -57.0 -56.7 -57.0 61 0 SPO 1997 04 14 02 01 30 9.3 -9 672.20 -57.0 -56.7 -57.0 61 -99 SPO 1997 04 14 02 02 29 9.5 -9 672.30 -56.9 -56.8 -57.0 60 -99 SPO 1997 04 14 02 03 29 9.9 -9 672.20 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 14 02 04 28 9.5 -9 672.20 -56.9 -56.8 -57.1 61 -99 SPO 1997 04 14 02 05 28 9.8 -9 672.20 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 14 02 06 28 9.5 -9 672.20 -56.9 -56.8 -57.1 61 -99 SPO 1997 04 14 02 07 28 9.4 -9 672.20 -56.9 -56.8 -57.1 61 -99 SPO 1997 04 14 02 08 29 9.8 -9 672.20 -56.9 -56.8 -57.1 60 -99 SPO 1997 04 14 02 09 29 9.8 -9 672.20 -57.0 -56.9 -57.1 61 -99 SPO 1997 04 14 02 10 29 9.5 -9 672.20 -57.0 -56.8 -57.1 61 -99 SPO 1997 04 14 02 11 28 9.4 -9 672.20 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 02 12 27 9.4 -9 672.20 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 14 02 13 26 9.5 -9 672.20 -57.0 -56.8 -57.1 63 -99 SPO 1997 04 14 02 14 26 9.7 -9 672.20 -57.0 -56.8 -57.1 63 -99 SPO 1997 04 14 02 15 26 9.6 -9 672.20 -57.0 -56.8 -57.0 63 -99 SPO 1997 04 14 02 16 25 9.3 -9 672.20 -57.0 -56.7 -57.0 63 -99 SPO 1997 04 14 02 17 25 9.4 -9 672.20 -57.0 -56.8 -57.1 63 -99 SPO 1997 04 14 02 18 25 9.6 -9 672.20 -57.0 -56.8 -57.0 62 -99 SPO 1997 04 14 02 19 24 9.4 -9 672.20 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 14 02 20 24 9.3 -9 672.20 -56.9 -56.8 -57.1 61 -99 SPO 1997 04 14 02 21 24 9.6 -9 672.20 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 14 02 22 23 9.3 -9 672.20 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 14 02 23 24 9.0 -9 672.20 -56.9 -56.8 -57.0 62 -99 SPO 1997 04 14 02 24 23 9.2 -9 672.20 -56.9 -56.8 -57.0 63 -99 SPO 1997 04 14 02 25 24 9.6 -9 672.20 -56.9 -56.8 -57.0 63 -99 SPO 1997 04 14 02 26 24 9.2 -9 672.20 -56.9 -56.7 -56.9 63 -99 SPO 1997 04 14 02 27 24 9.0 -9 672.20 -56.9 -56.6 -57.0 63 -99 SPO 1997 04 14 02 28 24 8.9 -9 672.20 -56.9 -56.6 -56.9 63 -99 SPO 1997 04 14 02 29 23 9.7 -9 672.20 -56.9 -56.6 -56.9 63 -99 SPO 1997 04 14 02 30 23 9.2 -9 672.20 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 14 02 31 23 9.2 -9 672.20 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 14 02 32 23 9.1 -9 672.20 -56.8 -56.5 -56.9 61 -99 SPO 1997 04 14 02 33 23 9.3 -9 672.20 -56.8 -56.5 -56.8 61 -99 SPO 1997 04 14 02 34 23 9.3 -9 672.20 -56.8 -56.5 -56.8 62 -99 SPO 1997 04 14 02 35 23 9.4 -9 672.20 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 14 02 36 23 8.9 -9 672.20 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 14 02 37 24 9.0 -9 672.20 -56.7 -56.6 -56.8 63 -99 SPO 1997 04 14 02 38 24 9.0 -9 672.20 -56.8 -56.6 -56.8 64 -99 SPO 1997 04 14 02 39 25 9.1 -9 672.20 -56.8 -56.6 -56.8 64 -99 SPO 1997 04 14 02 40 25 9.4 -9 672.20 -56.8 -56.6 -56.8 63 -99 SPO 1997 04 14 02 41 25 9.0 -9 672.20 -56.6 -56.5 -56.8 61 -99 SPO 1997 04 14 02 42 26 9.2 -9 672.20 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 14 02 43 26 8.9 -9 672.10 -56.7 -56.6 -56.8 62 -99 SPO 1997 04 14 02 44 27 8.9 -9 672.10 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 14 02 45 26 8.9 -9 672.10 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 14 02 46 26 8.9 -9 672.10 -56.7 -56.4 -56.8 63 -99 SPO 1997 04 14 02 47 27 8.9 -9 672.10 -56.7 -56.4 -56.8 63 -99 SPO 1997 04 14 02 48 27 9.1 -9 672.10 -56.7 -56.4 -56.7 62 -99 SPO 1997 04 14 02 49 26 9.0 -9 672.10 -56.7 -56.4 -56.7 62 -99 SPO 1997 04 14 02 50 26 9.4 -9 672.10 -56.6 -56.4 -56.7 61 -99 SPO 1997 04 14 02 51 26 9.3 -9 672.10 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 14 02 52 25 9.5 -9 672.10 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 14 02 53 25 9.3 -9 672.10 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 14 02 54 25 9.2 -9 672.10 -56.7 -56.5 -56.7 62 -99 SPO 1997 04 14 02 55 26 9.6 -9 672.00 -56.7 -56.4 -56.7 62 -99 SPO 1997 04 14 02 56 26 10.0 -9 672.00 -56.7 -56.3 -56.6 63 -99 SPO 1997 04 14 02 57 26 9.9 -9 672.00 -56.6 -56.3 -56.5 63 -99 SPO 1997 04 14 02 58 27 9.7 -9 672.00 -56.5 -56.4 -56.6 63 -99 SPO 1997 04 14 02 59 28 9.5 -9 672.00 -56.5 -56.4 -56.6 63 -99 SPO 1997 04 14 03 00 28 9.6 -9 672.00 -56.5 -56.3 -56.6 63 0 SPO 1997 04 14 03 01 27 9.5 -9 672.00 -56.5 -56.3 -56.6 63 -99 SPO 1997 04 14 03 02 28 9.6 -9 672.00 -56.5 -56.3 -56.6 62 -99 SPO 1997 04 14 03 03 28 9.7 -9 672.10 -56.5 -56.2 -56.6 61 -99 SPO 1997 04 14 03 04 27 9.5 -9 672.10 -56.5 -56.2 -56.6 61 -99 SPO 1997 04 14 03 05 27 9.6 -9 672.10 -56.5 -56.2 -56.5 61 -99 SPO 1997 04 14 03 06 28 8.9 -9 672.10 -56.5 -56.2 -56.6 61 -99 SPO 1997 04 14 03 07 28 9.5 -9 672.10 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 03 08 28 9.7 -9 672.10 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 14 03 09 26 9.4 -9 672.10 -56.4 -56.2 -56.4 62 -99 SPO 1997 04 14 03 10 26 9.1 -9 672.10 -56.4 -56.2 -56.4 62 -99 SPO 1997 04 14 03 11 26 9.4 -9 672.10 -56.4 -56.2 -56.4 62 -99 SPO 1997 04 14 03 12 27 9.4 -9 672.10 -56.4 -56.2 -56.4 64 -99 SPO 1997 04 14 03 13 28 9.4 -9 672.10 -56.4 -56.2 -56.4 64 -99 SPO 1997 04 14 03 14 28 9.1 -9 672.10 -56.3 -56.2 -56.4 64 -99 SPO 1997 04 14 03 15 28 9.4 -9 672.10 -56.3 -56.1 -56.4 64 -99 SPO 1997 04 14 03 16 27 9.7 -9 672.10 -56.3 -56.1 -56.3 63 -99 SPO 1997 04 14 03 17 28 9.4 -9 672.10 -56.3 -56.1 -56.4 63 -99 SPO 1997 04 14 03 18 29 9.1 -9 672.10 -56.3 -56.1 -56.4 63 -99 SPO 1997 04 14 03 19 29 9.2 -9 672.10 -56.3 -56.0 -56.4 63 -99 SPO 1997 04 14 03 20 29 9.5 -9 672.10 -56.3 -56.0 -56.4 64 -99 SPO 1997 04 14 03 21 29 9.1 -9 672.10 -56.3 -56.0 -56.4 64 -99 SPO 1997 04 14 03 22 30 9.0 -9 672.10 -56.2 -56.0 -56.3 64 -99 SPO 1997 04 14 03 23 30 9.1 -9 672.10 -56.2 -56.0 -56.3 64 -99 SPO 1997 04 14 03 24 30 8.8 -9 672.20 -56.2 -56.0 -56.2 64 -99 SPO 1997 04 14 03 25 31 8.8 -9 672.20 -56.2 -56.0 -56.2 64 -99 SPO 1997 04 14 03 26 30 8.5 -9 672.20 -56.2 -56.0 -56.2 63 -99 SPO 1997 04 14 03 27 31 8.9 -9 672.20 -56.2 -56.0 -56.2 63 -99 SPO 1997 04 14 03 28 31 8.7 -9 672.20 -56.2 -56.0 -56.2 63 -99 SPO 1997 04 14 03 29 31 9.0 -9 672.20 -56.2 -56.0 -56.2 64 -99 SPO 1997 04 14 03 30 29 9.0 -9 672.10 -56.2 -55.9 -56.2 64 -99 SPO 1997 04 14 03 31 30 8.9 -9 672.10 -56.1 -55.9 -56.1 64 -99 SPO 1997 04 14 03 32 31 8.6 -9 672.20 -56.0 -56.0 -56.2 64 -99 SPO 1997 04 14 03 33 31 8.7 -9 672.20 -56.1 -56.0 -56.2 64 -99 SPO 1997 04 14 03 34 32 8.7 -9 672.20 -56.1 -56.0 -56.3 64 -99 SPO 1997 04 14 03 35 31 8.4 -9 672.20 -56.1 -55.9 -56.3 64 -99 SPO 1997 04 14 03 36 31 8.7 -9 672.20 -56.2 -56.0 -56.3 64 -99 SPO 1997 04 14 03 37 33 8.8 -9 672.20 -56.2 -55.9 -56.2 63 -99 SPO 1997 04 14 03 38 32 8.2 -9 672.20 -56.2 -56.0 -56.3 62 -99 SPO 1997 04 14 03 39 33 8.4 -9 672.20 -56.2 -56.0 -56.3 61 -99 SPO 1997 04 14 03 40 31 8.6 -9 672.20 -56.2 -56.0 -56.3 61 -99 SPO 1997 04 14 03 41 31 8.5 -9 672.20 -56.2 -56.0 -56.3 61 -99 SPO 1997 04 14 03 42 32 8.4 -9 672.20 -56.2 -56.0 -56.3 61 -99 SPO 1997 04 14 03 43 33 8.2 -9 672.20 -56.2 -56.1 -56.3 62 -99 SPO 1997 04 14 03 44 34 8.4 -9 672.20 -56.3 -56.1 -56.4 64 -99 SPO 1997 04 14 03 45 35 8.4 -9 672.20 -56.3 -56.1 -56.4 64 -99 SPO 1997 04 14 03 46 35 7.9 -9 672.20 -56.3 -56.1 -56.4 64 -99 SPO 1997 04 14 03 47 36 7.9 -9 672.20 -56.2 -56.1 -56.4 64 -99 SPO 1997 04 14 03 48 35 8.2 -9 672.20 -56.2 -56.1 -56.4 63 -99 SPO 1997 04 14 03 49 36 8.2 -9 672.20 -56.3 -56.1 -56.4 63 -99 SPO 1997 04 14 03 50 35 8.5 -9 672.20 -56.3 -56.0 -56.4 62 -99 SPO 1997 04 14 03 51 34 8.1 -9 672.20 -56.3 -56.0 -56.3 62 -99 SPO 1997 04 14 03 52 36 8.0 -9 672.30 -56.3 -56.0 -56.4 62 -99 SPO 1997 04 14 03 53 35 8.1 -9 672.30 -56.3 -56.1 -56.4 62 -99 SPO 1997 04 14 03 54 35 7.9 -9 672.30 -56.3 -56.1 -56.4 63 -99 SPO 1997 04 14 03 55 36 7.6 -9 672.40 -56.3 -56.2 -56.4 63 -99 SPO 1997 04 14 03 56 36 7.7 -9 672.40 -56.3 -56.3 -56.5 63 -99 SPO 1997 04 14 03 57 37 7.4 -9 672.30 -56.4 -56.3 -56.5 63 -99 SPO 1997 04 14 03 58 37 7.3 -9 672.30 -56.5 -56.3 -56.6 63 -99 SPO 1997 04 14 03 59 37 7.1 -9 672.30 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 14 04 00 37 7.0 -9 672.40 -56.6 -56.4 -56.6 62 0 SPO 1997 04 14 04 01 37 7.5 -9 672.40 -56.6 -56.4 -56.6 61 -99 SPO 1997 04 14 04 02 37 7.1 -9 672.40 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 03 36 7.2 -9 672.40 -56.5 -56.4 -56.7 61 -99 SPO 1997 04 14 04 04 37 7.3 -9 672.40 -56.5 -56.4 -56.6 60 -99 SPO 1997 04 14 04 05 38 6.8 -9 672.40 -56.6 -56.3 -56.6 60 -99 SPO 1997 04 14 04 06 38 6.7 -9 672.40 -56.6 -56.3 -56.7 60 -99 SPO 1997 04 14 04 07 39 6.8 -9 672.40 -56.6 -56.3 -56.6 60 -99 SPO 1997 04 14 04 08 41 6.5 -9 672.40 -56.6 -56.3 -56.7 62 -99 SPO 1997 04 14 04 09 41 6.6 -9 672.40 -56.6 -56.3 -56.6 62 -99 SPO 1997 04 14 04 10 42 6.2 -9 672.40 -56.6 -56.3 -56.6 62 -99 SPO 1997 04 14 04 11 45 5.7 -9 672.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 12 43 5.6 -9 672.50 -56.6 -56.4 -56.7 60 -99 SPO 1997 04 14 04 13 41 6.2 -9 672.50 -56.5 -56.3 -56.6 60 -99 SPO 1997 04 14 04 14 40 5.6 -9 672.50 -56.6 -56.3 -56.5 61 -99 SPO 1997 04 14 04 15 42 5.8 -9 672.50 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 14 04 16 42 5.9 -9 672.50 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 14 04 17 43 5.8 -9 672.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 18 42 5.8 -9 672.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 19 43 5.1 -9 672.50 -56.4 -56.4 -56.6 61 -99 SPO 1997 04 14 04 20 43 5.1 -9 672.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 21 42 5.4 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 22 43 5.2 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 23 44 4.8 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 24 42 5.0 -9 672.50 -56.5 -56.2 -56.5 61 -99 SPO 1997 04 14 04 25 41 5.4 -9 672.50 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 14 04 26 42 5.4 -9 672.50 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 14 04 27 41 4.9 -9 672.50 -56.4 -56.3 -56.6 60 -99 SPO 1997 04 14 04 28 41 5.2 -9 672.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 29 39 5.2 -9 672.50 -56.5 -56.4 -56.7 61 -99 SPO 1997 04 14 04 30 37 5.5 -9 672.50 -56.6 -56.4 -56.6 62 -99 SPO 1997 04 14 04 31 36 5.3 -9 672.60 -56.6 -56.4 -56.6 63 -99 SPO 1997 04 14 04 32 37 5.2 -9 672.60 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 14 04 33 37 5.2 -9 672.60 -56.6 -56.4 -56.6 63 -99 SPO 1997 04 14 04 34 36 5.5 -9 672.60 -56.5 -56.4 -56.6 63 -99 SPO 1997 04 14 04 35 36 5.6 -9 672.60 -56.5 -56.4 -56.6 63 -99 SPO 1997 04 14 04 36 35 5.9 -9 672.60 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 14 04 37 35 6.0 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 38 36 6.0 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 39 36 6.1 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 40 35 6.0 -9 672.50 -56.5 -56.2 -56.6 61 -99 SPO 1997 04 14 04 41 35 5.8 -9 672.50 -56.5 -56.2 -56.6 62 -99 SPO 1997 04 14 04 42 35 6.1 -9 672.50 -56.5 -56.2 -56.5 62 -99 SPO 1997 04 14 04 43 35 6.0 -9 672.50 -56.5 -56.2 -56.6 62 -99 SPO 1997 04 14 04 44 37 6.2 -9 672.50 -56.5 -56.2 -56.6 62 -99 SPO 1997 04 14 04 45 35 5.9 -9 672.50 -56.4 -56.2 -56.6 62 -99 SPO 1997 04 14 04 46 35 6.3 -9 672.50 -56.5 -56.2 -56.5 63 -99 SPO 1997 04 14 04 47 36 5.9 -9 672.50 -56.5 -56.2 -56.5 62 -99 SPO 1997 04 14 04 48 36 5.7 -9 672.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 14 04 49 36 5.8 -9 672.50 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 14 04 50 37 5.7 -9 672.50 -56.6 -56.3 -56.6 62 -99 SPO 1997 04 14 04 51 37 5.7 -9 672.50 -56.5 -56.3 -56.7 61 -99 SPO 1997 04 14 04 52 38 5.5 -9 672.50 -56.6 -56.3 -56.7 61 -99 SPO 1997 04 14 04 53 37 5.8 -9 672.50 -56.6 -56.3 -56.7 61 -99 SPO 1997 04 14 04 54 37 5.9 -9 672.50 -56.6 -56.3 -56.6 62 -99 SPO 1997 04 14 04 55 36 5.8 -9 672.40 -56.6 -56.3 -56.7 62 -99 SPO 1997 04 14 04 56 38 5.8 -9 672.40 -56.6 -56.3 -56.7 62 -99 SPO 1997 04 14 04 57 38 5.7 -9 672.40 -56.6 -56.3 -56.8 62 -99 SPO 1997 04 14 04 58 36 6.0 -9 672.40 -56.7 -56.3 -56.8 63 -99 SPO 1997 04 14 04 59 37 5.9 -9 672.40 -56.7 -56.2 -56.7 61 -99 SPO 1997 04 14 05 00 36 6.2 -9 672.40 -56.7 -56.2 -56.8 61 0 SPO 1997 04 14 05 01 34 5.9 -9 672.40 -56.7 -56.3 -56.7 61 -99 SPO 1997 04 14 05 02 33 6.1 -9 672.40 -56.6 -56.3 -56.7 60 -99 SPO 1997 04 14 05 03 33 6.5 -9 672.30 -56.7 -56.3 -56.6 60 -99 SPO 1997 04 14 05 04 32 6.4 -9 672.40 -56.7 -56.2 -56.7 61 -99 SPO 1997 04 14 05 05 32 6.5 -9 672.30 -56.7 -56.2 -56.6 63 -99 SPO 1997 04 14 05 06 31 6.7 -9 672.30 -56.7 -56.2 -56.6 63 -99 SPO 1997 04 14 05 07 31 6.6 -9 672.30 -56.6 -56.1 -56.5 62 -99 SPO 1997 04 14 05 08 32 6.8 -9 672.30 -56.4 -56.1 -56.5 62 -99 SPO 1997 04 14 05 09 33 6.6 -9 672.30 -56.5 -56.1 -56.5 63 -99 SPO 1997 04 14 05 10 33 6.7 -9 672.30 -56.4 -56.0 -56.5 61 -99 SPO 1997 04 14 05 11 33 6.7 -9 672.30 -56.4 -56.0 -56.5 61 -99 SPO 1997 04 14 05 12 33 6.4 -9 672.30 -56.4 -56.0 -56.4 61 -99 SPO 1997 04 14 05 13 33 6.5 -9 672.30 -56.4 -56.0 -56.5 61 -99 SPO 1997 04 14 05 14 32 6.4 -9 672.30 -56.4 -56.0 -56.4 61 -99 SPO 1997 04 14 05 15 31 6.6 -9 672.30 -56.4 -56.0 -56.4 61 -99 SPO 1997 04 14 05 16 31 6.5 -9 672.30 -56.3 -56.0 -56.4 61 -99 SPO 1997 04 14 05 17 31 6.6 -9 672.30 -56.3 -56.0 -56.3 62 -99 SPO 1997 04 14 05 18 30 6.4 -9 672.30 -56.3 -56.0 -56.3 64 -99 SPO 1997 04 14 05 19 30 6.5 -9 672.30 -56.3 -55.9 -56.2 64 -99 SPO 1997 04 14 05 20 31 6.8 -9 672.30 -56.2 -55.9 -56.2 62 -99 SPO 1997 04 14 05 21 31 6.3 -9 672.30 -56.2 -55.8 -56.2 62 -99 SPO 1997 04 14 05 22 32 6.5 -9 672.40 -56.2 -55.8 -56.2 63 -99 SPO 1997 04 14 05 23 32 6.4 -9 672.30 -56.1 -55.8 -56.1 61 -99 SPO 1997 04 14 05 24 33 6.5 -9 672.30 -56.1 -55.7 -56.0 61 -99 SPO 1997 04 14 05 25 34 6.7 -9 672.30 -56.0 -55.7 -56.0 61 -99 SPO 1997 04 14 05 26 33 6.7 -9 672.30 -55.9 -55.6 -56.0 61 -99 SPO 1997 04 14 05 27 32 6.8 -9 672.40 -55.8 -55.6 -55.9 61 -99 SPO 1997 04 14 05 28 33 6.7 -9 672.40 -55.8 -55.6 -55.9 61 -99 SPO 1997 04 14 05 29 34 6.8 -9 672.30 -55.8 -55.5 -55.9 61 -99 SPO 1997 04 14 05 30 35 6.9 -9 672.30 -55.8 -55.5 -55.9 61 -99 SPO 1997 04 14 05 31 35 6.9 -9 672.40 -55.8 -55.5 -55.8 61 -99 SPO 1997 04 14 05 32 35 6.8 -9 672.40 -55.8 -55.5 -55.8 61 -99 SPO 1997 04 14 05 33 37 6.6 -9 672.40 -55.7 -55.5 -55.8 61 -99 SPO 1997 04 14 05 34 36 6.6 -9 672.40 -55.8 -55.5 -55.8 61 -99 SPO 1997 04 14 05 35 35 6.3 -9 672.40 -55.7 -55.5 -55.8 61 -99 SPO 1997 04 14 05 36 34 6.3 -9 672.40 -55.7 -55.5 -55.8 61 -99 SPO 1997 04 14 05 37 34 6.6 -9 672.40 -55.7 -55.5 -55.8 61 -99 SPO 1997 04 14 05 38 33 6.2 -9 672.40 -55.7 -55.4 -55.7 62 -99 SPO 1997 04 14 05 39 32 7.0 -9 672.40 -55.6 -55.4 -55.6 62 -99 SPO 1997 04 14 05 40 31 7.0 -9 672.40 -55.6 -55.3 -55.5 63 -99 SPO 1997 04 14 05 41 31 7.0 -9 672.40 -55.5 -55.3 -55.5 63 -99 SPO 1997 04 14 05 42 31 7.0 -9 672.30 -55.5 -55.3 -55.5 64 -99 SPO 1997 04 14 05 43 32 6.9 -9 672.30 -55.5 -55.3 -55.6 64 -99 SPO 1997 04 14 05 44 33 7.2 -9 672.30 -55.5 -55.3 -55.5 64 -99 SPO 1997 04 14 05 45 32 7.0 -9 672.30 -55.4 -55.3 -55.5 62 -99 SPO 1997 04 14 05 46 32 7.2 -9 672.30 -55.4 -55.2 -55.5 62 -99 SPO 1997 04 14 05 47 32 7.5 -9 672.30 -55.4 -55.2 -55.4 62 -99 SPO 1997 04 14 05 48 32 7.2 -9 672.30 -55.3 -55.2 -55.4 62 -99 SPO 1997 04 14 05 49 31 7.3 -9 672.20 -55.3 -55.2 -55.4 61 -99 SPO 1997 04 14 05 50 31 7.8 -9 672.20 -55.3 -55.2 -55.3 62 -99 SPO 1997 04 14 05 51 31 7.3 -9 672.20 -55.3 -55.2 -55.3 63 -99 SPO 1997 04 14 05 52 31 7.6 -9 672.20 -55.3 -55.2 -55.3 63 -99 SPO 1997 04 14 05 53 30 7.5 -9 672.20 -55.2 -55.1 -55.3 63 -99 SPO 1997 04 14 05 54 29 7.7 -9 672.20 -55.2 -55.1 -55.2 63 -99 SPO 1997 04 14 05 55 28 7.5 -9 672.20 -55.2 -55.0 -55.1 64 -99 SPO 1997 04 14 05 56 28 7.5 -9 672.20 -55.1 -55.0 -55.1 63 -99 SPO 1997 04 14 05 57 29 7.4 -9 672.20 -55.1 -55.0 -55.1 62 -99 SPO 1997 04 14 05 58 30 7.2 -9 672.20 -55.1 -55.0 -55.1 62 -99 SPO 1997 04 14 05 59 30 7.1 -9 672.20 -55.1 -55.0 -55.2 62 -99 SPO 1997 04 14 06 00 30 7.1 -9 672.20 -55.1 -55.0 -55.2 62 0 SPO 1997 04 14 06 01 30 7.4 -9 672.20 -55.1 -54.9 -55.1 62 -99 SPO 1997 04 14 06 02 30 7.4 -9 672.20 -55.1 -54.9 -55.1 63 -99 SPO 1997 04 14 06 03 30 7.5 -9 672.20 -55.0 -54.9 -55.1 62 -99 SPO 1997 04 14 06 04 30 7.7 -9 672.20 -55.0 -54.9 -55.1 62 -99 SPO 1997 04 14 06 05 31 7.6 -9 672.20 -55.0 -54.9 -55.1 63 -99 SPO 1997 04 14 06 06 30 7.9 -9 672.20 -55.0 -54.9 -55.1 63 -99 SPO 1997 04 14 06 07 30 7.6 -9 672.20 -55.0 -55.0 -55.1 63 -99 SPO 1997 04 14 06 08 29 7.5 -9 672.20 -55.0 -55.0 -55.1 63 -99 SPO 1997 04 14 06 09 29 7.8 -9 672.20 -55.0 -55.0 -55.1 63 -99 SPO 1997 04 14 06 10 29 7.7 -9 672.20 -55.0 -55.0 -55.1 62 -99 SPO 1997 04 14 06 11 30 7.6 -9 672.20 -55.0 -54.9 -55.1 62 -99 SPO 1997 04 14 06 12 29 7.9 -9 672.20 -55.0 -54.9 -55.1 62 -99 SPO 1997 04 14 06 13 30 7.9 -9 672.20 -55.0 -54.9 -55.0 62 -99 SPO 1997 04 14 06 14 30 8.0 -9 672.20 -55.0 -54.8 -55.0 63 -99 SPO 1997 04 14 06 15 32 7.7 -9 672.20 -55.0 -54.8 -55.0 64 -99 SPO 1997 04 14 06 16 32 7.5 -9 672.20 -54.9 -54.8 -55.1 63 -99 SPO 1997 04 14 06 17 31 7.8 -9 672.20 -55.0 -54.8 -55.0 64 -99 SPO 1997 04 14 06 18 31 7.6 -9 672.10 -55.0 -54.8 -55.0 63 -99 SPO 1997 04 14 06 19 30 7.9 -9 672.10 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 14 06 20 30 7.8 -9 672.10 -54.9 -54.7 -55.0 62 -99 SPO 1997 04 14 06 21 29 7.8 -9 672.10 -54.8 -54.7 -55.0 62 -99 SPO 1997 04 14 06 22 28 8.0 -9 672.10 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 14 06 23 29 8.0 -9 672.10 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 14 06 24 29 7.8 -9 672.10 -54.9 -54.7 -54.9 63 -99 SPO 1997 04 14 06 25 30 8.0 -9 672.10 -54.8 -54.7 -55.0 62 -99 SPO 1997 04 14 06 26 29 8.0 -9 672.00 -54.8 -54.7 -54.9 63 -99 SPO 1997 04 14 06 27 29 8.3 -9 672.10 -54.8 -54.7 -54.9 64 -99 SPO 1997 04 14 06 28 29 8.1 -9 672.10 -54.9 -54.6 -54.9 65 -99 SPO 1997 04 14 06 29 29 7.8 -9 672.10 -54.9 -54.7 -55.0 65 -99 SPO 1997 04 14 06 30 28 8.2 -9 672.00 -54.9 -54.6 -54.9 64 -99 SPO 1997 04 14 06 31 27 8.4 -9 672.10 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 14 06 32 26 8.8 -9 672.10 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 14 06 33 26 8.5 -9 672.10 -54.8 -54.5 -54.9 62 -99 SPO 1997 04 14 06 34 27 8.4 -9 672.00 -54.8 -54.6 -55.0 62 -99 SPO 1997 04 14 06 35 27 8.8 -9 672.00 -54.8 -54.5 -55.0 61 -99 SPO 1997 04 14 06 36 27 8.8 -9 672.00 -54.9 -54.5 -55.0 62 -99 SPO 1997 04 14 06 37 27 8.6 -9 672.00 -54.9 -54.5 -54.9 62 -99 SPO 1997 04 14 06 38 26 8.8 -9 672.00 -54.8 -54.5 -54.9 62 -99 SPO 1997 04 14 06 39 25 8.7 -9 672.00 -54.8 -54.5 -54.9 62 -99 SPO 1997 04 14 06 40 25 8.7 -9 672.00 -54.8 -54.5 -54.9 62 -99 SPO 1997 04 14 06 41 24 8.8 -9 672.00 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 14 06 42 24 8.8 -9 672.00 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 14 06 43 25 8.4 -9 672.10 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 14 06 44 25 8.2 -9 672.10 -54.9 -54.6 -55.0 62 -99 SPO 1997 04 14 06 45 24 8.2 -9 672.10 -54.9 -54.6 -55.0 62 -99 SPO 1997 04 14 06 46 25 8.3 -9 672.10 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 14 06 47 27 7.9 -9 672.10 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 14 06 48 27 8.0 -9 672.10 -54.9 -54.6 -55.0 62 -99 SPO 1997 04 14 06 49 28 7.5 -9 672.10 -54.9 -54.6 -55.0 62 -99 SPO 1997 04 14 06 50 29 7.8 -9 672.10 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 14 06 51 28 7.7 -9 672.10 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 14 06 52 29 7.7 -9 672.20 -54.9 -54.6 -54.9 63 -99 SPO 1997 04 14 06 53 29 7.7 -9 672.10 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 14 06 54 28 8.2 -9 672.20 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 14 06 55 29 8.0 -9 672.20 -54.9 -54.6 -55.0 62 -99 SPO 1997 04 14 06 56 30 7.7 -9 672.20 -54.9 -54.6 -55.0 61 -99 SPO 1997 04 14 06 57 30 7.5 -9 672.20 -54.9 -54.7 -55.0 61 -99 SPO 1997 04 14 06 58 30 7.7 -9 672.20 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 14 06 59 31 7.5 -9 672.20 -55.0 -54.7 -55.1 61 -99 SPO 1997 04 14 07 00 31 7.5 -9 672.20 -55.0 -54.8 -55.1 62 0 SPO 1997 04 14 07 01 30 7.7 -9 672.20 -55.0 -54.8 -55.1 62 -99 SPO 1997 04 14 07 02 30 7.8 -9 672.20 -55.0 -54.8 -55.1 62 -99 SPO 1997 04 14 07 03 29 7.2 -9 672.20 -55.0 -54.8 -55.1 62 -99 SPO 1997 04 14 07 04 30 7.2 -9 672.30 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 14 07 05 30 7.3 -9 672.30 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 14 07 06 30 7.2 -9 672.30 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 14 07 07 30 7.0 -9 672.30 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 14 07 08 28 7.1 -9 672.30 -55.2 -54.8 -55.3 62 -99 SPO 1997 04 14 07 09 28 7.1 -9 672.40 -55.2 -54.8 -55.3 62 -99 SPO 1997 04 14 07 10 28 6.8 -9 672.40 -55.1 -54.8 -55.3 60 -99 SPO 1997 04 14 07 11 26 7.1 -9 672.40 -55.2 -54.8 -55.3 61 -99 SPO 1997 04 14 07 12 27 7.2 -9 672.40 -55.2 -54.8 -55.2 61 -99 SPO 1997 04 14 07 13 26 6.7 -9 672.40 -55.2 -54.9 -55.3 61 -99 SPO 1997 04 14 07 14 27 6.8 -9 672.40 -55.3 -55.0 -55.4 62 -99 SPO 1997 04 14 07 15 26 6.5 -9 672.40 -55.3 -55.0 -55.4 62 -99 SPO 1997 04 14 07 16 26 6.5 -9 672.50 -55.3 -55.0 -55.4 62 -99 SPO 1997 04 14 07 17 26 6.2 -9 672.50 -55.3 -55.0 -55.4 62 -99 SPO 1997 04 14 07 18 26 5.9 -9 672.50 -55.4 -55.0 -55.5 62 -99 SPO 1997 04 14 07 19 28 5.6 -9 672.50 -55.4 -55.1 -55.6 62 -99 SPO 1997 04 14 07 20 26 6.1 -9 672.50 -55.4 -55.1 -55.6 60 -99 SPO 1997 04 14 07 21 25 5.9 -9 672.50 -55.4 -55.1 -55.4 59 -99 SPO 1997 04 14 07 22 26 5.5 -9 672.50 -55.4 -55.1 -55.5 59 -99 SPO 1997 04 14 07 23 27 5.9 -9 672.50 -55.5 -55.1 -55.6 60 -99 SPO 1997 04 14 07 24 27 5.7 -9 672.50 -55.5 -55.1 -55.5 60 -99 SPO 1997 04 14 07 25 27 5.8 -9 672.50 -55.4 -55.1 -55.6 60 -99 SPO 1997 04 14 07 26 28 6.0 -9 672.50 -55.5 -55.1 -55.6 62 -99 SPO 1997 04 14 07 27 29 5.7 -9 672.50 -55.5 -55.1 -55.6 61 -99 SPO 1997 04 14 07 28 29 6.1 -9 672.60 -55.5 -55.1 -55.6 60 -99 SPO 1997 04 14 07 29 30 6.0 -9 672.50 -55.5 -55.1 -55.6 60 -99 SPO 1997 04 14 07 30 30 6.0 -9 672.50 -55.5 -55.2 -55.6 59 -99 SPO 1997 04 14 07 31 30 6.3 -9 672.50 -55.5 -55.2 -55.6 60 -99 SPO 1997 04 14 07 32 30 5.8 -9 672.50 -55.5 -55.2 -55.6 60 -99 SPO 1997 04 14 07 33 33 5.9 -9 672.50 -55.5 -55.2 -55.6 60 -99 SPO 1997 04 14 07 34 33 5.9 -9 672.50 -55.6 -55.2 -55.7 60 -99 SPO 1997 04 14 07 35 33 5.8 -9 672.50 -55.6 -55.2 -55.7 60 -99 SPO 1997 04 14 07 36 33 5.8 -9 672.50 -55.6 -55.2 -55.7 61 -99 SPO 1997 04 14 07 37 34 6.0 -9 672.50 -55.6 -55.2 -55.6 61 -99 SPO 1997 04 14 07 38 33 6.0 -9 672.50 -55.6 -55.2 -55.6 62 -99 SPO 1997 04 14 07 39 33 5.9 -9 672.50 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 14 07 40 32 5.9 -9 672.50 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 14 07 41 32 6.1 -9 672.50 -55.5 -55.1 -55.6 60 -99 SPO 1997 04 14 07 42 32 6.0 -9 672.50 -55.6 -55.1 -55.6 61 -99 SPO 1997 04 14 07 43 32 5.9 -9 672.50 -55.6 -55.1 -55.7 60 -99 SPO 1997 04 14 07 44 33 6.0 -9 672.50 -55.6 -55.1 -55.7 60 -99 SPO 1997 04 14 07 45 32 6.2 -9 672.50 -55.6 -55.1 -55.7 59 -99 SPO 1997 04 14 07 46 33 6.1 -9 672.50 -55.6 -55.1 -55.7 60 -99 SPO 1997 04 14 07 47 33 5.9 -9 672.50 -55.6 -55.2 -55.8 61 -99 SPO 1997 04 14 07 48 32 6.2 -9 672.50 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 07 49 32 6.1 -9 672.50 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 07 50 32 6.0 -9 672.50 -55.7 -55.2 -55.7 61 -99 SPO 1997 04 14 07 51 31 5.8 -9 672.60 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 07 52 31 6.0 -9 672.60 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 07 53 32 5.5 -9 672.60 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 14 07 54 33 5.8 -9 672.60 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 14 07 55 32 5.8 -9 672.60 -55.7 -55.3 -55.8 60 -99 SPO 1997 04 14 07 56 33 5.9 -9 672.60 -55.8 -55.2 -55.8 60 -99 SPO 1997 04 14 07 57 33 6.0 -9 672.60 -55.7 -55.2 -55.8 59 -99 SPO 1997 04 14 07 58 32 5.7 -9 672.50 -55.7 -55.2 -55.8 59 -99 SPO 1997 04 14 07 59 33 5.9 -9 672.50 -55.7 -55.2 -55.9 60 -99 SPO 1997 04 14 08 00 34 5.8 -9 672.50 -55.8 -55.2 -55.9 61 0 SPO 1997 04 14 08 01 33 5.9 -9 672.50 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 02 33 6.4 -9 672.50 -55.8 -55.1 -55.8 60 -99 SPO 1997 04 14 08 03 32 6.3 -9 672.50 -55.8 -55.2 -55.8 61 -99 SPO 1997 04 14 08 04 32 6.4 -9 672.50 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 05 30 6.2 -9 672.50 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 06 30 6.3 -9 672.50 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 07 30 6.2 -9 672.40 -55.8 -55.2 -55.8 60 -99 SPO 1997 04 14 08 08 30 6.1 -9 672.50 -55.8 -55.2 -55.9 60 -99 SPO 1997 04 14 08 09 30 6.1 -9 672.50 -55.8 -55.2 -55.9 59 -99 SPO 1997 04 14 08 10 31 5.8 -9 672.50 -55.8 -55.2 -56.0 60 -99 SPO 1997 04 14 08 11 31 6.0 -9 672.50 -55.9 -55.2 -55.9 61 -99 SPO 1997 04 14 08 12 30 5.7 -9 672.50 -55.9 -55.2 -55.9 61 -99 SPO 1997 04 14 08 13 29 6.0 -9 672.50 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 14 29 6.0 -9 672.50 -55.8 -55.1 -56.0 61 -99 SPO 1997 04 14 08 15 28 6.0 -9 672.50 -55.8 -55.1 -55.9 61 -99 SPO 1997 04 14 08 16 28 6.0 -9 672.50 -55.8 -55.1 -55.9 61 -99 SPO 1997 04 14 08 17 28 6.1 -9 672.50 -55.8 -55.1 -55.9 61 -99 SPO 1997 04 14 08 18 28 6.3 -9 672.50 -55.8 -55.1 -55.8 59 -99 SPO 1997 04 14 08 19 29 6.2 -9 672.50 -55.7 -55.1 -55.7 59 -99 SPO 1997 04 14 08 20 29 6.3 -9 672.50 -55.8 -55.1 -55.8 59 -99 SPO 1997 04 14 08 21 28 5.9 -9 672.50 -55.8 -55.2 -55.8 60 -99 SPO 1997 04 14 08 22 27 6.2 -9 672.50 -55.8 -55.2 -55.9 60 -99 SPO 1997 04 14 08 23 27 6.0 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 24 27 6.1 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 25 26 6.2 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 26 25 5.7 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 27 24 6.0 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 08 28 24 5.8 -9 672.60 -55.9 -55.2 -55.9 61 -99 SPO 1997 04 14 08 29 24 6.0 -9 672.60 -55.9 -55.2 -55.9 61 -99 SPO 1997 04 14 08 30 24 6.1 -9 672.60 -55.9 -55.1 -56.0 60 -99 SPO 1997 04 14 08 31 23 6.0 -9 672.60 -55.8 -55.1 -55.9 59 -99 SPO 1997 04 14 08 32 22 5.9 -9 672.60 -55.8 -55.1 -56.0 59 -99 SPO 1997 04 14 08 33 22 5.8 -9 672.60 -55.8 -55.1 -56.0 60 -99 SPO 1997 04 14 08 34 22 5.8 -9 672.60 -55.9 -55.1 -56.0 61 -99 SPO 1997 04 14 08 35 21 5.6 -9 672.60 -55.9 -55.1 -56.0 61 -99 SPO 1997 04 14 08 36 19 5.5 -9 672.60 -55.9 -55.1 -56.0 61 -99 SPO 1997 04 14 08 37 20 5.4 -9 672.60 -55.9 -55.2 -56.0 61 -99 SPO 1997 04 14 08 38 19 5.4 -9 672.60 -56.0 -55.2 -56.0 61 -99 SPO 1997 04 14 08 39 19 5.7 -9 672.60 -56.0 -55.2 -56.0 61 -99 SPO 1997 04 14 08 40 19 5.6 -9 672.60 -56.0 -55.2 -56.0 61 -99 SPO 1997 04 14 08 41 20 5.7 -9 672.60 -56.0 -55.2 -56.0 61 -99 SPO 1997 04 14 08 42 20 6.0 -9 672.60 -56.0 -55.2 -56.0 60 -99 SPO 1997 04 14 08 43 19 6.0 -9 672.60 -56.0 -55.2 -56.1 60 -99 SPO 1997 04 14 08 44 19 6.2 -9 672.60 -56.0 -55.2 -56.1 60 -99 SPO 1997 04 14 08 45 19 6.0 -9 672.60 -56.0 -55.1 -56.1 60 -99 SPO 1997 04 14 08 46 19 5.9 -9 672.60 -56.0 -55.2 -56.1 61 -99 SPO 1997 04 14 08 47 19 6.0 -9 672.60 -56.0 -55.2 -56.1 61 -99 SPO 1997 04 14 08 48 19 5.9 -9 672.60 -56.0 -55.2 -56.0 61 -99 SPO 1997 04 14 08 49 19 5.9 -9 672.60 -56.0 -55.1 -56.0 61 -99 SPO 1997 04 14 08 50 20 6.1 -9 672.60 -56.0 -55.1 -56.0 61 -99 SPO 1997 04 14 08 51 20 6.1 -9 672.60 -55.9 -55.1 -56.0 61 -99 SPO 1997 04 14 08 52 20 6.2 -9 672.60 -55.9 -55.1 -56.0 60 -99 SPO 1997 04 14 08 53 19 6.5 -9 672.60 -55.8 -55.1 -55.9 59 -99 SPO 1997 04 14 08 54 18 6.5 -9 672.60 -55.9 -55.2 -55.8 61 -99 SPO 1997 04 14 08 55 18 6.5 -9 672.60 -55.8 -55.2 -55.8 61 -99 SPO 1997 04 14 08 56 19 6.5 -9 672.60 -55.8 -55.2 -55.8 61 -99 SPO 1997 04 14 08 57 19 6.5 -9 672.60 -55.8 -55.2 -55.8 61 -99 SPO 1997 04 14 08 58 19 6.5 -9 672.60 -55.8 -55.2 -55.8 61 -99 SPO 1997 04 14 08 59 20 6.6 -9 672.60 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 09 00 21 6.8 -9 672.60 -55.7 -55.2 -55.8 61 0 SPO 1997 04 14 09 01 23 7.0 -9 672.60 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 09 02 24 7.0 -9 672.60 -55.8 -55.2 -55.8 62 -99 SPO 1997 04 14 09 03 24 7.1 -9 672.60 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 14 09 04 24 6.8 -9 672.60 -55.7 -55.2 -55.9 60 -99 SPO 1997 04 14 09 05 23 6.8 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 09 06 22 6.7 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 09 07 23 7.0 -9 672.60 -55.8 -55.2 -55.9 61 -99 SPO 1997 04 14 09 08 23 6.9 -9 672.60 -55.8 -55.2 -56.0 60 -99 SPO 1997 04 14 09 09 22 6.9 -9 672.60 -55.8 -55.3 -55.9 60 -99 SPO 1997 04 14 09 10 22 6.9 -9 672.60 -55.9 -55.3 -56.0 61 -99 SPO 1997 04 14 09 11 23 7.1 -9 672.60 -55.9 -55.4 -56.0 61 -99 SPO 1997 04 14 09 12 23 7.0 -9 672.50 -55.9 -55.4 -56.0 61 -99 SPO 1997 04 14 09 13 24 7.0 -9 672.50 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 09 14 24 6.9 -9 672.50 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 09 15 25 7.0 -9 672.50 -56.0 -55.5 -56.1 60 -99 SPO 1997 04 14 09 16 26 7.0 -9 672.50 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 09 17 25 6.9 -9 672.50 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 09 18 25 6.9 -9 672.50 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 09 19 25 7.0 -9 672.50 -56.0 -55.5 -56.2 59 -99 SPO 1997 04 14 09 20 25 7.1 -9 672.50 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 09 21 25 7.3 -9 672.50 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 09 22 25 7.1 -9 672.50 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 09 23 25 7.1 -9 672.50 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 09 24 24 7.0 -9 672.60 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 14 09 25 24 6.8 -9 672.50 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 09 26 24 6.8 -9 672.60 -56.2 -55.6 -56.3 60 -99 SPO 1997 04 14 09 27 24 6.8 -9 672.60 -56.2 -55.6 -56.2 60 -99 SPO 1997 04 14 09 28 24 7.0 -9 672.60 -56.2 -55.6 -56.3 60 -99 SPO 1997 04 14 09 29 25 6.9 -9 672.60 -56.2 -55.7 -56.3 60 -99 SPO 1997 04 14 09 30 25 6.8 -9 672.60 -56.2 -55.6 -56.2 59 -99 SPO 1997 04 14 09 31 24 6.6 -9 672.60 -56.2 -55.6 -56.2 60 -99 SPO 1997 04 14 09 32 24 6.6 -9 672.60 -56.2 -55.7 -56.2 61 -99 SPO 1997 04 14 09 33 24 6.3 -9 672.60 -56.2 -55.6 -56.2 61 -99 SPO 1997 04 14 09 34 24 6.6 -9 672.60 -56.2 -55.6 -56.2 61 -99 SPO 1997 04 14 09 35 24 6.6 -9 672.60 -56.0 -55.6 -56.2 60 -99 SPO 1997 04 14 09 36 23 6.4 -9 672.60 -56.0 -55.6 -56.2 61 -99 SPO 1997 04 14 09 37 24 6.3 -9 672.60 -56.0 -55.6 -56.1 61 -99 SPO 1997 04 14 09 38 25 6.5 -9 672.60 -56.0 -55.6 -56.0 61 -99 SPO 1997 04 14 09 39 26 6.4 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 09 40 26 6.7 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 09 41 27 6.5 -9 672.60 -55.9 -55.5 -56.0 60 -99 SPO 1997 04 14 09 42 26 6.3 -9 672.60 -55.9 -55.5 -56.0 60 -99 SPO 1997 04 14 09 43 27 6.4 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 09 44 26 6.5 -9 672.60 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 09 45 27 6.2 -9 672.60 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 09 46 27 6.2 -9 672.60 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 14 09 47 27 6.3 -9 672.60 -56.0 -55.5 -56.1 62 -99 SPO 1997 04 14 09 48 27 6.4 -9 672.60 -56.0 -55.5 -56.0 63 -99 SPO 1997 04 14 09 49 27 6.3 -9 672.60 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 09 50 27 6.3 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 09 51 27 6.2 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 09 52 28 6.3 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 09 53 29 6.4 -9 672.60 -55.9 -55.5 -56.0 60 -99 SPO 1997 04 14 09 54 28 6.2 -9 672.60 -55.9 -55.5 -56.0 60 -99 SPO 1997 04 14 09 55 28 6.1 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 09 56 27 6.3 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 09 57 26 6.3 -9 672.60 -55.9 -55.4 -56.0 62 -99 SPO 1997 04 14 09 58 25 6.4 -9 672.60 -55.9 -55.4 -56.0 62 -99 SPO 1997 04 14 09 59 25 6.7 -9 672.60 -55.9 -55.5 -56.0 62 -99 SPO 1997 04 14 10 00 24 6.8 -9 672.60 -55.9 -55.5 -56.0 62 0 SPO 1997 04 14 10 01 24 6.8 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 10 02 26 7.0 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 10 03 26 6.7 -9 672.60 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 10 04 27 6.6 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 05 28 6.6 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 06 27 6.5 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 07 26 6.4 -9 672.60 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 14 10 08 25 6.3 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 09 25 6.2 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 10 27 6.1 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 11 26 6.4 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 12 26 6.6 -9 672.60 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 13 26 6.5 -9 672.60 -56.0 -55.4 -56.1 60 -99 SPO 1997 04 14 10 14 24 6.4 -9 672.60 -56.0 -55.5 -56.1 60 -99 SPO 1997 04 14 10 15 25 6.8 -9 672.60 -56.0 -55.4 -56.0 60 -99 SPO 1997 04 14 10 16 25 6.6 -9 672.60 -56.0 -55.5 -56.0 60 -99 SPO 1997 04 14 10 17 25 6.5 -9 672.70 -56.0 -55.5 -56.1 60 -99 SPO 1997 04 14 10 18 26 6.3 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 19 26 6.2 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 10 20 26 6.3 -9 672.70 -56.1 -55.5 -56.1 63 -99 SPO 1997 04 14 10 21 27 6.1 -9 672.60 -56.1 -55.5 -56.1 63 -99 SPO 1997 04 14 10 22 27 6.5 -9 672.60 -56.0 -55.5 -56.1 62 -99 SPO 1997 04 14 10 23 28 6.3 -9 672.60 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 10 24 27 6.5 -9 672.60 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 10 25 26 6.5 -9 672.60 -55.9 -55.4 -56.0 59 -99 SPO 1997 04 14 10 26 25 6.3 -9 672.60 -55.9 -55.4 -56.0 59 -99 SPO 1997 04 14 10 27 26 6.3 -9 672.60 -55.9 -55.4 -56.0 59 -99 SPO 1997 04 14 10 28 26 6.4 -9 672.60 -55.9 -55.4 -56.0 59 -99 SPO 1997 04 14 10 29 28 6.5 -9 672.60 -55.9 -55.3 -55.9 60 -99 SPO 1997 04 14 10 30 26 6.5 -9 672.60 -55.9 -55.3 -55.9 60 -99 SPO 1997 04 14 10 31 26 6.7 -9 672.60 -55.8 -55.3 -55.9 60 -99 SPO 1997 04 14 10 32 27 6.9 -9 672.60 -55.8 -55.3 -55.8 61 -99 SPO 1997 04 14 10 33 27 7.0 -9 672.60 -55.8 -55.4 -55.8 61 -99 SPO 1997 04 14 10 34 27 7.1 -9 672.60 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 14 10 35 27 6.9 -9 672.60 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 14 10 36 25 7.1 -9 672.60 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 14 10 37 25 6.8 -9 672.60 -55.7 -55.3 -55.7 61 -99 SPO 1997 04 14 10 38 24 6.8 -9 672.60 -55.7 -55.3 -55.7 61 -99 SPO 1997 04 14 10 39 24 6.9 -9 672.60 -55.7 -55.3 -55.7 61 -99 SPO 1997 04 14 10 40 25 6.9 -9 672.60 -55.6 -55.3 -55.6 60 -99 SPO 1997 04 14 10 41 24 6.8 -9 672.60 -55.6 -55.3 -55.6 61 -99 SPO 1997 04 14 10 42 24 6.7 -9 672.60 -55.6 -55.2 -55.6 62 -99 SPO 1997 04 14 10 43 23 6.9 -9 672.60 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 14 10 44 23 6.8 -9 672.60 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 14 10 45 23 7.1 -9 672.60 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 14 10 46 23 6.8 -9 672.60 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 14 10 47 23 7.1 -9 672.60 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 14 10 48 23 7.0 -9 672.60 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 14 10 49 22 7.1 -9 672.60 -55.6 -55.3 -55.7 62 -99 SPO 1997 04 14 10 50 22 7.3 -9 672.60 -55.6 -55.3 -55.7 62 -99 SPO 1997 04 14 10 51 22 7.3 -9 672.60 -55.6 -55.3 -55.7 62 -99 SPO 1997 04 14 10 52 22 7.4 -9 672.60 -55.6 -55.3 -55.8 62 -99 SPO 1997 04 14 10 53 21 7.3 -9 672.60 -55.7 -55.3 -55.8 62 -99 SPO 1997 04 14 10 54 21 7.4 -9 672.60 -55.7 -55.3 -55.8 62 -99 SPO 1997 04 14 10 55 22 7.5 -9 672.60 -55.7 -55.3 -55.8 63 -99 SPO 1997 04 14 10 56 23 7.3 -9 672.60 -55.7 -55.3 -55.8 62 -99 SPO 1997 04 14 10 57 22 7.3 -9 672.60 -55.8 -55.3 -55.9 63 -99 SPO 1997 04 14 10 58 22 7.4 -9 672.60 -55.7 -55.3 -55.9 61 -99 SPO 1997 04 14 10 59 23 7.4 -9 672.60 -55.7 -55.3 -55.9 61 -99 SPO 1997 04 14 11 00 23 7.5 -9 672.60 -55.8 -55.3 -56.0 61 0 SPO 1997 04 14 11 01 22 7.6 -9 672.60 -55.8 -55.3 -56.0 60 -99 SPO 1997 04 14 11 02 21 7.3 -9 672.60 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 11 03 21 7.5 -9 672.60 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 11 04 21 7.3 -9 672.60 -55.9 -55.4 -56.0 60 -99 SPO 1997 04 14 11 05 20 7.3 -9 672.60 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 11 06 20 7.0 -9 672.70 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 11 07 21 6.9 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 11 08 21 6.9 -9 672.70 -56.0 -55.5 -56.2 61 -99 SPO 1997 04 14 11 09 22 6.9 -9 672.70 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 14 11 10 23 7.0 -9 672.70 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 14 11 11 23 7.1 -9 672.70 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 11 12 23 7.0 -9 672.70 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 11 13 23 6.9 -9 672.70 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 11 14 23 6.9 -9 672.70 -56.0 -55.6 -56.2 59 -99 SPO 1997 04 14 11 15 22 6.8 -9 672.70 -56.1 -55.6 -56.2 60 -99 SPO 1997 04 14 11 16 23 6.7 -9 672.70 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 11 17 23 6.9 -9 672.70 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 11 18 23 6.8 -9 672.70 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 11 19 24 6.7 -9 672.70 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 11 20 24 6.7 -9 672.70 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 11 21 23 6.7 -9 672.70 -56.1 -55.6 -56.1 61 -99 SPO 1997 04 14 11 22 24 6.6 -9 672.70 -56.1 -55.6 -56.1 61 -99 SPO 1997 04 14 11 23 25 6.7 -9 672.70 -56.0 -55.6 -56.0 60 -99 SPO 1997 04 14 11 24 24 6.7 -9 672.70 -56.0 -55.6 -56.0 60 -99 SPO 1997 04 14 11 25 24 6.8 -9 672.70 -55.9 -55.6 -55.9 59 -99 SPO 1997 04 14 11 26 23 6.5 -9 672.70 -55.9 -55.6 -55.9 59 -99 SPO 1997 04 14 11 27 24 6.9 -9 672.80 -55.9 -55.5 -55.9 60 -99 SPO 1997 04 14 11 28 22 7.0 -9 672.80 -55.9 -55.5 -55.8 61 -99 SPO 1997 04 14 11 29 22 6.9 -9 672.80 -55.8 -55.5 -55.9 61 -99 SPO 1997 04 14 11 30 23 6.9 -9 672.80 -55.9 -55.5 -55.9 62 -99 SPO 1997 04 14 11 31 22 6.9 -9 672.80 -55.8 -55.5 -55.9 62 -99 SPO 1997 04 14 11 32 21 7.0 -9 672.70 -55.8 -55.5 -55.9 62 -99 SPO 1997 04 14 11 33 21 6.9 -9 672.70 -55.8 -55.5 -56.0 62 -99 SPO 1997 04 14 11 34 21 7.1 -9 672.70 -55.8 -55.5 -55.9 62 -99 SPO 1997 04 14 11 35 21 7.0 -9 672.70 -55.8 -55.5 -55.9 61 -99 SPO 1997 04 14 11 36 22 6.9 -9 672.70 -55.8 -55.4 -56.0 60 -99 SPO 1997 04 14 11 37 21 7.0 -9 672.70 -55.8 -55.5 -55.9 59 -99 SPO 1997 04 14 11 38 21 7.0 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 39 21 6.9 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 40 22 7.0 -9 672.70 -55.9 -55.6 -56.0 62 -99 SPO 1997 04 14 11 41 21 7.1 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 42 21 7.2 -9 672.70 -55.9 -55.5 -55.9 61 -99 SPO 1997 04 14 11 43 23 6.9 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 44 23 6.8 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 45 23 7.0 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 46 23 7.2 -9 672.70 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 11 47 23 7.3 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 48 23 7.1 -9 672.70 -55.8 -55.5 -56.0 60 -99 SPO 1997 04 14 11 49 22 7.0 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 50 22 7.2 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 51 22 7.2 -9 672.70 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 14 11 52 21 7.0 -9 672.70 -55.9 -55.4 -56.0 61 -99 SPO 1997 04 14 11 53 21 7.3 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 11 54 21 7.4 -9 672.70 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 11 55 21 7.6 -9 672.70 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 11 56 22 7.6 -9 672.60 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 11 57 22 7.5 -9 672.60 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 11 58 21 7.5 -9 672.70 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 11 59 21 7.4 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 12 00 21 7.5 -9 672.70 -56.0 -55.5 -56.1 61 0 SPO 1997 04 14 12 01 22 7.7 -9 672.60 -56.1 -55.5 -56.1 61 -99 SPO 1997 04 14 12 02 21 7.8 -9 672.60 -56.1 -55.5 -56.1 61 -99 SPO 1997 04 14 12 03 21 7.6 -9 672.60 -56.0 -55.5 -56.1 60 -99 SPO 1997 04 14 12 04 21 7.6 -9 672.60 -56.0 -55.5 -56.2 61 -99 SPO 1997 04 14 12 05 22 7.6 -9 672.70 -56.0 -55.5 -56.2 61 -99 SPO 1997 04 14 12 06 21 7.6 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 12 07 21 7.6 -9 672.70 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 14 12 08 22 7.7 -9 672.70 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 12 09 21 7.7 -9 672.70 -56.0 -55.4 -56.1 59 -99 SPO 1997 04 14 12 10 21 7.5 -9 672.70 -56.0 -55.4 -56.1 58 -99 SPO 1997 04 14 12 11 22 7.8 -9 672.60 -56.0 -55.5 -56.1 59 -99 SPO 1997 04 14 12 12 22 7.8 -9 672.60 -56.1 -55.5 -56.1 60 -99 SPO 1997 04 14 12 13 22 7.6 -9 672.60 -56.0 -55.5 -56.0 59 -99 SPO 1997 04 14 12 14 22 7.6 -9 672.60 -56.0 -55.5 -56.0 60 -99 SPO 1997 04 14 12 15 22 7.7 -9 672.60 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 12 16 23 7.8 -9 672.60 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 12 17 22 7.8 -9 672.70 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 12 18 21 7.7 -9 672.70 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 12 19 21 7.7 -9 672.70 -56.0 -55.3 -56.0 61 -99 SPO 1997 04 14 12 20 21 7.7 -9 672.70 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 12 21 20 7.6 -9 672.70 -55.8 -55.3 -56.0 59 -99 SPO 1997 04 14 12 22 20 7.7 -9 672.70 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 12 23 20 7.7 -9 672.70 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 12 24 19 7.5 -9 672.70 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 12 25 20 7.5 -9 672.70 -55.9 -55.3 -56.0 60 -99 SPO 1997 04 14 12 26 19 7.4 -9 672.70 -55.9 -55.3 -56.1 59 -99 SPO 1997 04 14 12 27 19 7.4 -9 672.70 -56.0 -55.3 -56.1 60 -99 SPO 1997 04 14 12 28 18 7.3 -9 672.70 -56.1 -55.4 -56.2 61 -99 SPO 1997 04 14 12 29 17 7.4 -9 672.70 -56.1 -55.4 -56.2 61 -99 SPO 1997 04 14 12 30 17 7.2 -9 672.80 -56.1 -55.4 -56.2 61 -99 SPO 1997 04 14 12 31 18 7.2 -9 672.80 -56.1 -55.4 -56.2 61 -99 SPO 1997 04 14 12 32 18 7.1 -9 672.80 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 14 12 33 19 7.1 -9 672.80 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 14 12 34 19 7.1 -9 672.80 -56.2 -55.4 -56.3 60 -99 SPO 1997 04 14 12 35 19 7.2 -9 672.80 -56.2 -55.4 -56.3 59 -99 SPO 1997 04 14 12 36 19 7.0 -9 672.80 -56.2 -55.4 -56.3 59 -99 SPO 1997 04 14 12 37 20 7.0 -9 672.80 -56.2 -55.4 -56.4 59 -99 SPO 1997 04 14 12 38 19 7.0 -9 672.80 -56.2 -55.4 -56.4 60 -99 SPO 1997 04 14 12 39 20 7.1 -9 672.80 -56.3 -55.4 -56.4 61 -99 SPO 1997 04 14 12 40 20 7.1 -9 672.80 -56.3 -55.4 -56.4 61 -99 SPO 1997 04 14 12 41 20 7.1 -9 672.80 -56.3 -55.4 -56.4 61 -99 SPO 1997 04 14 12 42 20 6.9 -9 672.80 -56.3 -55.4 -56.4 61 -99 SPO 1997 04 14 12 43 21 7.0 -9 672.80 -56.4 -55.4 -56.4 61 -99 SPO 1997 04 14 12 44 22 6.9 -9 672.80 -56.4 -55.4 -56.5 61 -99 SPO 1997 04 14 12 45 22 7.0 -9 672.80 -56.4 -55.5 -56.5 60 -99 SPO 1997 04 14 12 46 21 6.9 -9 672.80 -56.4 -55.5 -56.5 59 -99 SPO 1997 04 14 12 47 22 7.0 -9 672.80 -56.4 -55.5 -56.5 59 -99 SPO 1997 04 14 12 48 21 7.0 -9 672.80 -56.4 -55.4 -56.5 59 -99 SPO 1997 04 14 12 49 20 7.0 -9 672.80 -56.5 -55.4 -56.4 60 -99 SPO 1997 04 14 12 50 20 6.9 -9 672.80 -56.5 -55.4 -56.5 61 -99 SPO 1997 04 14 12 51 20 7.0 -9 672.80 -56.4 -55.4 -56.5 61 -99 SPO 1997 04 14 12 52 19 6.9 -9 672.90 -56.4 -55.4 -56.5 61 -99 SPO 1997 04 14 12 53 19 6.9 -9 672.90 -56.4 -55.4 -56.5 60 -99 SPO 1997 04 14 12 54 20 6.8 -9 672.90 -56.4 -55.4 -56.6 61 -99 SPO 1997 04 14 12 55 20 6.8 -9 672.90 -56.5 -55.4 -56.6 61 -99 SPO 1997 04 14 12 56 20 6.9 -9 672.90 -56.5 -55.4 -56.6 61 -99 SPO 1997 04 14 12 57 21 7.1 -9 672.90 -56.5 -55.4 -56.6 60 -99 SPO 1997 04 14 12 58 21 6.9 -9 672.90 -56.5 -55.4 -56.6 59 -99 SPO 1997 04 14 12 59 22 7.0 -9 672.90 -56.5 -55.4 -56.6 58 -99 SPO 1997 04 14 13 00 22 7.0 -9 672.90 -56.6 -55.4 -56.7 59 0 SPO 1997 04 14 13 01 23 7.1 -9 672.80 -56.6 -55.5 -56.7 60 -99 SPO 1997 04 14 13 02 24 7.1 -9 672.80 -56.6 -55.4 -56.7 60 -99 SPO 1997 04 14 13 03 24 7.2 -9 672.80 -56.7 -55.4 -56.7 61 -99 SPO 1997 04 14 13 04 25 7.4 -9 672.80 -56.7 -55.4 -56.7 61 -99 SPO 1997 04 14 13 05 24 7.3 -9 672.80 -56.7 -55.4 -56.7 62 -99 SPO 1997 04 14 13 06 24 7.1 -9 672.80 -56.7 -55.4 -56.7 63 -99 SPO 1997 04 14 13 07 25 7.4 -9 672.80 -56.6 -55.4 -56.7 61 -99 SPO 1997 04 14 13 08 25 7.4 -9 672.80 -56.6 -55.4 -56.6 60 -99 SPO 1997 04 14 13 09 25 7.6 -9 672.80 -56.6 -55.4 -56.6 60 -99 SPO 1997 04 14 13 10 25 7.5 -9 672.80 -56.6 -55.4 -56.6 60 -99 SPO 1997 04 14 13 11 24 7.5 -9 672.80 -56.5 -55.4 -56.6 59 -99 SPO 1997 04 14 13 12 24 7.6 -9 672.80 -56.5 -55.4 -56.5 59 -99 SPO 1997 04 14 13 13 24 7.5 -9 672.80 -56.5 -55.4 -56.5 60 -99 SPO 1997 04 14 13 14 24 7.7 -9 672.80 -56.4 -55.4 -56.5 60 -99 SPO 1997 04 14 13 15 23 7.6 -9 672.80 -56.4 -55.3 -56.4 60 -99 SPO 1997 04 14 13 16 22 7.6 -9 672.80 -56.4 -55.3 -56.4 61 -99 SPO 1997 04 14 13 17 21 7.6 -9 672.80 -56.4 -55.4 -56.4 61 -99 SPO 1997 04 14 13 18 21 7.5 -9 672.80 -56.4 -55.4 -56.4 61 -99 SPO 1997 04 14 13 19 22 7.5 -9 672.80 -56.4 -55.4 -56.4 61 -99 SPO 1997 04 14 13 20 22 7.3 -9 672.80 -56.3 -55.4 -56.4 61 -99 SPO 1997 04 14 13 21 22 7.4 -9 672.80 -56.3 -55.4 -56.4 60 -99 SPO 1997 04 14 13 22 21 7.5 -9 672.90 -56.4 -55.4 -56.3 61 -99 SPO 1997 04 14 13 23 22 7.5 -9 672.80 -56.3 -55.4 -56.3 61 -99 SPO 1997 04 14 13 24 22 7.7 -9 672.80 -56.3 -55.4 -56.3 61 -99 SPO 1997 04 14 13 25 22 7.6 -9 672.90 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 14 13 26 22 7.5 -9 672.90 -56.2 -55.4 -56.3 61 -99 SPO 1997 04 14 13 27 22 7.5 -9 672.90 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 14 13 28 22 7.7 -9 672.90 -56.2 -55.4 -56.3 62 -99 SPO 1997 04 14 13 29 22 7.7 -9 672.90 -56.2 -55.4 -56.3 62 -99 SPO 1997 04 14 13 30 22 7.6 -9 672.90 -56.2 -55.3 -56.3 62 -99 SPO 1997 04 14 13 31 22 7.6 -9 672.90 -56.2 -55.3 -56.3 61 -99 SPO 1997 04 14 13 32 22 7.8 -9 672.90 -56.2 -55.3 -56.3 61 -99 SPO 1997 04 14 13 33 22 7.5 -9 672.90 -56.2 -55.4 -56.3 61 -99 SPO 1997 04 14 13 34 21 7.5 -9 672.90 -56.2 -55.4 -56.3 60 -99 SPO 1997 04 14 13 35 22 7.6 -9 672.90 -56.2 -55.4 -56.3 60 -99 SPO 1997 04 14 13 36 21 7.6 -9 672.90 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 13 37 22 7.4 -9 672.90 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 13 38 22 7.6 -9 672.90 -56.3 -55.5 -56.3 62 -99 SPO 1997 04 14 13 39 22 7.8 -9 672.90 -56.3 -55.5 -56.3 63 -99 SPO 1997 04 14 13 40 23 7.8 -9 672.90 -56.3 -55.4 -56.3 63 -99 SPO 1997 04 14 13 41 23 8.0 -9 672.80 -56.2 -55.4 -56.3 62 -99 SPO 1997 04 14 13 42 23 7.9 -9 672.80 -56.2 -55.4 -56.3 62 -99 SPO 1997 04 14 13 43 23 7.9 -9 672.80 -56.2 -55.4 -56.3 61 -99 SPO 1997 04 14 13 44 23 7.9 -9 672.80 -56.2 -55.4 -56.3 61 -99 SPO 1997 04 14 13 45 22 8.0 -9 672.80 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 14 13 46 22 7.9 -9 672.80 -56.1 -55.3 -56.2 60 -99 SPO 1997 04 14 13 47 21 8.1 -9 672.80 -56.1 -55.3 -56.2 61 -99 SPO 1997 04 14 13 48 21 8.1 -9 672.80 -56.1 -55.3 -56.2 61 -99 SPO 1997 04 14 13 49 21 8.1 -9 672.80 -56.1 -55.3 -56.2 61 -99 SPO 1997 04 14 13 50 21 8.0 -9 672.80 -56.1 -55.4 -56.1 61 -99 SPO 1997 04 14 13 51 21 8.0 -9 672.80 -56.1 -55.4 -56.1 62 -99 SPO 1997 04 14 13 52 21 7.9 -9 672.90 -56.1 -55.4 -56.1 62 -99 SPO 1997 04 14 13 53 21 8.0 -9 672.90 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 13 54 21 8.1 -9 672.90 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 13 55 22 7.8 -9 672.90 -56.1 -55.4 -56.1 62 -99 SPO 1997 04 14 13 56 22 7.6 -9 672.90 -56.1 -55.4 -56.1 61 -99 SPO 1997 04 14 13 57 21 7.7 -9 672.90 -56.1 -55.4 -56.1 61 -99 SPO 1997 04 14 13 58 21 7.6 -9 672.90 -56.1 -55.4 -56.1 61 -99 SPO 1997 04 14 13 59 22 7.6 -9 672.90 -56.0 -55.4 -56.2 61 -99 SPO 1997 04 14 14 00 22 7.8 -9 672.90 -56.0 -55.4 -56.1 61 0 SPO 1997 04 14 14 01 22 7.6 -9 672.90 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 14 02 22 7.6 -9 672.90 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 03 22 7.8 -9 672.90 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 04 22 7.5 -9 672.90 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 05 22 7.6 -9 672.90 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 14 06 22 7.5 -9 672.90 -56.0 -55.4 -56.1 60 -99 SPO 1997 04 14 14 07 21 7.5 -9 673.00 -56.0 -55.4 -56.1 60 -99 SPO 1997 04 14 14 08 20 7.5 -9 673.00 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 14 09 19 7.2 -9 673.00 -56.0 -55.5 -56.0 61 -99 SPO 1997 04 14 14 10 19 7.3 -9 673.10 -56.0 -55.5 -56.0 62 -99 SPO 1997 04 14 14 11 19 7.2 -9 673.10 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 14 12 20 7.3 -9 673.10 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 14 14 13 19 7.1 -9 673.10 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 14 19 7.0 -9 673.20 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 15 19 7.0 -9 673.20 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 16 18 6.9 -9 673.20 -55.9 -55.4 -56.0 62 -99 SPO 1997 04 14 14 17 18 7.0 -9 673.20 -55.9 -55.4 -56.1 61 -99 SPO 1997 04 14 14 18 18 7.0 -9 673.20 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 14 14 19 18 6.9 -9 673.20 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 14 20 17 7.2 -9 673.20 -56.0 -55.3 -56.1 61 -99 SPO 1997 04 14 14 21 17 7.0 -9 673.20 -56.0 -55.3 -56.1 61 -99 SPO 1997 04 14 14 22 16 6.8 -9 673.20 -56.0 -55.3 -56.1 61 -99 SPO 1997 04 14 14 23 15 7.0 -9 673.20 -56.0 -55.4 -56.1 61 -99 SPO 1997 04 14 14 24 15 6.8 -9 673.20 -56.1 -55.4 -56.2 62 -99 SPO 1997 04 14 14 25 15 6.6 -9 673.30 -56.1 -55.4 -56.2 62 -99 SPO 1997 04 14 14 26 16 6.7 -9 673.30 -56.1 -55.4 -56.2 62 -99 SPO 1997 04 14 14 27 16 6.8 -9 673.30 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 14 28 16 6.8 -9 673.30 -56.2 -55.5 -56.2 62 -99 SPO 1997 04 14 14 29 17 6.9 -9 673.30 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 14 14 30 17 6.6 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 31 17 6.6 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 32 19 6.7 -9 673.30 -56.1 -55.5 -56.3 60 -99 SPO 1997 04 14 14 33 18 6.5 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 34 18 6.5 -9 673.30 -56.2 -55.5 -56.4 61 -99 SPO 1997 04 14 14 35 18 6.7 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 36 19 6.6 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 37 20 6.7 -9 673.30 -56.2 -55.5 -56.3 61 -99 SPO 1997 04 14 14 38 20 6.6 -9 673.20 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 14 14 39 19 6.6 -9 673.20 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 14 14 40 18 6.7 -9 673.30 -56.2 -55.5 -56.1 61 -99 SPO 1997 04 14 14 41 18 6.7 -9 673.30 -56.2 -55.6 -56.1 61 -99 SPO 1997 04 14 14 42 18 6.8 -9 673.30 -56.1 -55.5 -56.1 61 -99 SPO 1997 04 14 14 43 17 6.7 -9 673.30 -56.1 -55.6 -56.1 60 -99 SPO 1997 04 14 14 44 18 6.7 -9 673.30 -56.1 -55.6 -56.1 60 -99 SPO 1997 04 14 14 45 17 6.8 -9 673.30 -56.1 -55.6 -56.1 61 -99 SPO 1997 04 14 14 46 18 6.7 -9 673.30 -56.1 -55.6 -56.1 61 -99 SPO 1997 04 14 14 47 19 6.8 -9 673.30 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 14 48 18 6.8 -9 673.30 -56.0 -55.6 -56.2 61 -99 SPO 1997 04 14 14 49 18 6.8 -9 673.30 -56.0 -55.6 -56.2 61 -99 SPO 1997 04 14 14 50 19 6.8 -9 673.30 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 14 51 18 6.6 -9 673.30 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 14 52 17 6.8 -9 673.30 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 14 14 53 16 6.8 -9 673.30 -56.1 -55.5 -56.2 61 -99 SPO 1997 04 14 14 54 18 6.7 -9 673.30 -56.1 -55.5 -56.2 60 -99 SPO 1997 04 14 14 55 17 6.9 -9 673.30 -56.1 -55.6 -56.2 60 -99 SPO 1997 04 14 14 56 17 6.9 -9 673.30 -56.2 -55.6 -56.2 61 -99 SPO 1997 04 14 14 57 17 6.8 -9 673.30 -56.2 -55.6 -56.2 61 -99 SPO 1997 04 14 14 58 17 6.8 -9 673.30 -56.2 -55.6 -56.2 62 -99 SPO 1997 04 14 14 59 16 6.7 -9 673.30 -56.2 -55.6 -56.3 62 -99 SPO 1997 04 14 15 00 16 6.5 -9 673.30 -56.2 -55.7 -56.3 63 0 SPO 1997 04 14 15 01 16 6.8 -9 673.30 -56.2 -55.7 -56.3 62 -99 SPO 1997 04 14 15 02 15 6.5 -9 673.40 -56.2 -55.7 -56.3 62 -99 SPO 1997 04 14 15 03 14 6.5 -9 673.40 -56.2 -55.7 -56.3 62 -99 SPO 1997 04 14 15 04 15 6.4 -9 673.40 -56.2 -55.7 -56.3 61 -99 SPO 1997 04 14 15 05 14 6.3 -9 673.40 -56.2 -55.7 -56.3 61 -99 SPO 1997 04 14 15 06 14 6.4 -9 673.40 -56.2 -55.7 -56.4 60 -99 SPO 1997 04 14 15 07 15 6.6 -9 673.40 -56.2 -55.7 -56.4 60 -99 SPO 1997 04 14 15 08 16 6.7 -9 673.40 -56.3 -55.7 -56.4 61 -99 SPO 1997 04 14 15 09 16 6.6 -9 673.40 -56.3 -55.6 -56.4 61 -99 SPO 1997 04 14 15 10 17 6.6 -9 673.40 -56.3 -55.6 -56.3 61 -99 SPO 1997 04 14 15 11 18 6.7 -9 673.40 -56.3 -55.7 -56.4 61 -99 SPO 1997 04 14 15 12 18 6.6 -9 673.40 -56.3 -55.7 -56.4 61 -99 SPO 1997 04 14 15 13 18 6.4 -9 673.40 -56.4 -55.8 -56.5 61 -99 SPO 1997 04 14 15 14 19 6.6 -9 673.40 -56.4 -55.8 -56.5 61 -99 SPO 1997 04 14 15 15 19 6.7 -9 673.40 -56.4 -55.8 -56.5 61 -99 SPO 1997 04 14 15 16 19 6.5 -9 673.40 -56.4 -55.8 -56.5 60 -99 SPO 1997 04 14 15 17 19 6.6 -9 673.40 -56.5 -55.8 -56.5 61 -99 SPO 1997 04 14 15 18 18 6.6 -9 673.40 -56.5 -55.8 -56.6 61 -99 SPO 1997 04 14 15 19 18 6.5 -9 673.40 -56.4 -55.7 -56.6 59 -99 SPO 1997 04 14 15 20 18 6.8 -9 673.40 -56.4 -55.8 -56.6 59 -99 SPO 1997 04 14 15 21 18 6.8 -9 673.40 -56.5 -55.8 -56.6 61 -99 SPO 1997 04 14 15 22 18 7.0 -9 673.40 -56.5 -55.7 -56.6 61 -99 SPO 1997 04 14 15 23 18 6.9 -9 673.30 -56.5 -55.7 -56.6 62 -99 SPO 1997 04 14 15 24 17 7.2 -9 673.30 -56.5 -55.7 -56.6 62 -99 SPO 1997 04 14 15 25 17 7.0 -9 673.30 -56.5 -55.7 -56.6 62 -99 SPO 1997 04 14 15 26 17 7.0 -9 673.30 -56.5 -55.6 -56.6 61 -99 SPO 1997 04 14 15 27 17 7.1 -9 673.30 -56.5 -55.6 -56.6 60 -99 SPO 1997 04 14 15 28 17 7.2 -9 673.30 -56.5 -55.7 -56.6 58 -99 SPO 1997 04 14 15 29 17 7.0 -9 673.30 -56.5 -55.7 -56.6 58 -99 SPO 1997 04 14 15 30 17 7.0 -9 673.30 -56.6 -55.7 -56.6 59 -99 SPO 1997 04 14 15 31 18 7.2 -9 673.30 -56.6 -55.7 -56.6 60 -99 SPO 1997 04 14 15 32 19 7.1 -9 673.30 -56.6 -55.7 -56.6 60 -99 SPO 1997 04 14 15 33 18 7.3 -9 673.30 -56.6 -55.7 -56.6 60 -99 SPO 1997 04 14 15 34 18 7.0 -9 673.30 -56.6 -55.7 -56.6 61 -99 SPO 1997 04 14 15 35 18 7.1 -9 673.30 -56.6 -55.7 -56.6 61 -99 SPO 1997 04 14 15 36 19 7.1 -9 673.30 -56.5 -55.7 -56.6 61 -99 SPO 1997 04 14 15 37 19 7.2 -9 673.30 -56.5 -55.7 -56.6 61 -99 SPO 1997 04 14 15 38 18 7.0 -9 673.30 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 14 15 39 18 6.9 -9 673.40 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 14 15 40 18 6.8 -9 673.40 -56.6 -55.6 -56.7 59 -99 SPO 1997 04 14 15 41 17 6.9 -9 673.40 -56.6 -55.6 -56.6 59 -99 SPO 1997 04 14 15 42 17 6.7 -9 673.50 -56.6 -55.6 -56.6 59 -99 SPO 1997 04 14 15 43 18 6.8 -9 673.50 -56.6 -55.6 -56.6 59 -99 SPO 1997 04 14 15 44 17 7.0 -9 673.50 -56.5 -55.6 -56.6 58 -99 SPO 1997 04 14 15 45 17 7.1 -9 673.50 -56.5 -55.7 -56.5 59 -99 SPO 1997 04 14 15 46 18 6.9 -9 673.50 -56.4 -55.7 -56.5 60 -99 SPO 1997 04 14 15 47 17 7.0 -9 673.50 -56.5 -55.7 -56.5 61 -99 SPO 1997 04 14 15 48 17 7.0 -9 673.50 -56.5 -55.7 -56.5 61 -99 SPO 1997 04 14 15 49 16 7.0 -9 673.50 -56.4 -55.6 -56.4 61 -99 SPO 1997 04 14 15 50 16 7.0 -9 673.50 -56.4 -55.6 -56.4 61 -99 SPO 1997 04 14 15 51 15 7.1 -9 673.50 -56.4 -55.6 -56.4 61 -99 SPO 1997 04 14 15 52 16 7.1 -9 673.50 -56.4 -55.6 -56.4 61 -99 SPO 1997 04 14 15 53 16 7.0 -9 673.50 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 15 54 16 7.1 -9 673.50 -56.2 -55.6 -56.4 58 -99 SPO 1997 04 14 15 55 16 6.9 -9 673.50 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 15 56 15 6.8 -9 673.50 -56.3 -55.7 -56.4 59 -99 SPO 1997 04 14 15 57 15 7.0 -9 673.50 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 15 58 15 7.0 -9 673.50 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 15 59 15 6.9 -9 673.60 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 16 00 15 6.9 -9 673.60 -56.3 -55.6 -56.4 59 0 SPO 1997 04 14 16 01 14 6.7 -9 673.60 -56.3 -55.6 -56.4 59 -99 SPO 1997 04 14 16 02 14 6.7 -9 673.60 -56.2 -55.7 -56.4 58 -99 SPO 1997 04 14 16 03 15 6.7 -9 673.70 -56.3 -55.7 -56.4 58 -99 SPO 1997 04 14 16 04 15 6.8 -9 673.60 -56.3 -55.7 -56.4 59 -99 SPO 1997 04 14 16 05 16 6.9 -9 673.60 -56.3 -55.7 -56.4 58 -99 SPO 1997 04 14 16 06 16 6.7 -9 673.70 -56.3 -55.7 -56.3 58 -99 SPO 1997 04 14 16 07 17 6.5 -9 673.70 -56.3 -55.7 -56.4 59 -99 SPO 1997 04 14 16 08 17 6.5 -9 673.70 -56.3 -55.7 -56.3 60 -99 SPO 1997 04 14 16 09 18 6.4 -9 673.70 -56.3 -55.7 -56.4 60 -99 SPO 1997 04 14 16 10 18 6.4 -9 673.70 -56.2 -55.7 -56.3 59 -99 SPO 1997 04 14 16 11 18 6.3 -9 673.70 -56.2 -55.7 -56.3 60 -99 SPO 1997 04 14 16 12 19 6.1 -9 673.70 -56.2 -55.7 -56.3 60 -99 SPO 1997 04 14 16 13 19 6.0 -9 673.80 -56.2 -55.7 -56.3 60 -99 SPO 1997 04 14 16 14 20 6.0 -9 673.80 -56.2 -55.7 -56.3 60 -99 SPO 1997 04 14 16 15 21 5.9 -9 673.80 -56.2 -55.6 -56.3 59 -99 SPO 1997 04 14 16 16 23 5.7 -9 673.80 -56.2 -55.6 -56.3 59 -99 SPO 1997 04 14 16 17 23 5.9 -9 673.80 -56.3 -55.7 -56.4 60 -99 SPO 1997 04 14 16 18 24 5.9 -9 673.80 -56.3 -55.8 -56.4 60 -99 SPO 1997 04 14 16 19 24 5.9 -9 673.80 -56.2 -55.8 -56.4 59 -99 SPO 1997 04 14 16 20 24 5.8 -9 673.80 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 14 16 21 24 5.9 -9 673.80 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 14 16 22 25 5.9 -9 673.80 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 14 16 23 25 6.0 -9 673.80 -56.4 -55.8 -56.4 61 -99 SPO 1997 04 14 16 24 26 5.8 -9 673.80 -56.4 -55.8 -56.4 61 -99 SPO 1997 04 14 16 25 27 5.7 -9 673.80 -56.4 -55.8 -56.4 61 -99 SPO 1997 04 14 16 26 28 5.7 -9 673.80 -56.3 -55.8 -56.5 60 -99 SPO 1997 04 14 16 27 28 5.7 -9 673.80 -56.3 -55.8 -56.5 60 -99 SPO 1997 04 14 16 28 28 5.6 -9 673.80 -56.4 -55.8 -56.5 60 -99 SPO 1997 04 14 16 29 28 5.4 -9 673.90 -56.4 -55.8 -56.5 61 -99 SPO 1997 04 14 16 30 29 5.5 -9 673.90 -56.4 -55.8 -56.6 61 -99 SPO 1997 04 14 16 31 29 5.4 -9 673.90 -56.5 -55.8 -56.6 61 -99 SPO 1997 04 14 16 32 30 5.3 -9 673.90 -56.5 -55.8 -56.6 61 -99 SPO 1997 04 14 16 33 30 5.3 -9 673.90 -56.5 -55.8 -56.6 60 -99 SPO 1997 04 14 16 34 30 5.3 -9 673.90 -56.5 -55.8 -56.6 60 -99 SPO 1997 04 14 16 35 29 5.4 -9 674.00 -56.6 -55.9 -56.7 60 -99 SPO 1997 04 14 16 36 30 5.4 -9 673.90 -56.6 -55.9 -56.7 60 -99 SPO 1997 04 14 16 37 29 5.3 -9 673.90 -56.6 -55.9 -56.7 60 -99 SPO 1997 04 14 16 38 29 5.3 -9 674.00 -56.7 -55.9 -56.7 60 -99 SPO 1997 04 14 16 39 29 5.2 -9 674.00 -56.8 -55.9 -56.8 60 -99 SPO 1997 04 14 16 40 29 5.4 -9 674.00 -56.7 -55.9 -56.8 60 -99 SPO 1997 04 14 16 41 30 5.3 -9 674.00 -56.6 -55.9 -56.8 60 -99 SPO 1997 04 14 16 42 31 5.4 -9 674.00 -56.7 -55.9 -56.8 60 -99 SPO 1997 04 14 16 43 31 5.4 -9 674.00 -56.8 -55.9 -56.8 61 -99 SPO 1997 04 14 16 44 31 5.3 -9 674.00 -56.8 -55.9 -56.9 61 -99 SPO 1997 04 14 16 45 30 5.3 -9 674.00 -56.8 -56.0 -57.0 61 -99 SPO 1997 04 14 16 46 30 5.2 -9 674.00 -56.9 -56.0 -57.0 62 -99 SPO 1997 04 14 16 47 30 5.3 -9 674.00 -56.9 -55.9 -57.0 61 -99 SPO 1997 04 14 16 48 30 5.2 -9 674.00 -56.9 -56.0 -57.0 60 -99 SPO 1997 04 14 16 49 31 5.2 -9 674.00 -57.0 -56.0 -57.1 60 -99 SPO 1997 04 14 16 50 32 5.2 -9 674.00 -57.0 -56.0 -57.1 59 -99 SPO 1997 04 14 16 51 32 5.3 -9 674.00 -57.0 -56.1 -57.2 59 -99 SPO 1997 04 14 16 52 32 5.2 -9 674.00 -57.1 -56.1 -57.2 60 -99 SPO 1997 04 14 16 53 33 5.3 -9 674.00 -57.1 -56.2 -57.2 60 -99 SPO 1997 04 14 16 54 33 5.3 -9 674.00 -57.1 -56.2 -57.3 60 -99 SPO 1997 04 14 16 55 34 5.3 -9 674.00 -57.2 -56.2 -57.3 60 -99 SPO 1997 04 14 16 56 35 5.3 -9 674.00 -57.2 -56.2 -57.4 60 -99 SPO 1997 04 14 16 57 34 5.4 -9 674.00 -57.3 -56.2 -57.4 60 -99 SPO 1997 04 14 16 58 35 5.4 -9 674.00 -57.3 -56.2 -57.4 60 -99 SPO 1997 04 14 16 59 34 5.3 -9 674.00 -57.3 -56.3 -57.4 60 -99 SPO 1997 04 14 17 00 34 5.2 -9 674.00 -57.3 -56.3 -57.5 60 0 SPO 1997 04 14 17 01 36 5.1 -9 674.00 -57.4 -56.3 -57.5 59 -99 SPO 1997 04 14 17 02 36 5.1 -9 674.00 -57.4 -56.3 -57.6 58 -99 SPO 1997 04 14 17 03 35 5.2 -9 674.00 -57.4 -56.3 -57.6 58 -99 SPO 1997 04 14 17 04 34 5.2 -9 674.00 -57.5 -56.3 -57.5 59 -99 SPO 1997 04 14 17 05 35 5.3 -9 674.00 -57.5 -56.3 -57.5 59 -99 SPO 1997 04 14 17 06 34 5.3 -9 674.00 -57.5 -56.3 -57.5 59 -99 SPO 1997 04 14 17 07 33 5.3 -9 674.00 -57.5 -56.4 -57.6 59 -99 SPO 1997 04 14 17 08 32 5.3 -9 674.00 -57.5 -56.4 -57.6 59 -99 SPO 1997 04 14 17 09 31 5.2 -9 674.00 -57.5 -56.4 -57.5 59 -99 SPO 1997 04 14 17 10 30 5.3 -9 674.00 -57.5 -56.4 -57.5 59 -99 SPO 1997 04 14 17 11 28 5.2 -9 674.00 -57.5 -56.3 -57.4 59 -99 SPO 1997 04 14 17 12 28 5.5 -9 674.00 -57.4 -56.3 -57.4 58 -99 SPO 1997 04 14 17 13 29 5.5 -9 674.00 -57.4 -56.3 -57.4 58 -99 SPO 1997 04 14 17 14 30 5.5 -9 674.00 -57.4 -56.3 -57.4 58 -99 SPO 1997 04 14 17 15 30 5.6 -9 674.00 -57.4 -56.4 -57.4 58 -99 SPO 1997 04 14 17 16 30 5.7 -9 674.00 -57.4 -56.3 -57.4 59 -99 SPO 1997 04 14 17 17 29 5.8 -9 674.00 -57.4 -56.3 -57.5 60 -99 SPO 1997 04 14 17 18 30 5.8 -9 674.00 -57.4 -56.3 -57.5 60 -99 SPO 1997 04 14 17 19 30 5.8 -9 674.00 -57.4 -56.3 -57.4 60 -99 SPO 1997 04 14 17 20 30 5.8 -9 674.00 -57.4 -56.3 -57.5 60 -99 SPO 1997 04 14 17 21 30 5.7 -9 674.00 -57.4 -56.3 -57.5 60 -99 SPO 1997 04 14 17 22 31 5.8 -9 674.00 -57.4 -56.4 -57.5 58 -99 SPO 1997 04 14 17 23 30 5.6 -9 674.00 -57.4 -56.4 -57.5 58 -99 SPO 1997 04 14 17 24 30 5.8 -9 674.00 -57.5 -56.4 -57.5 59 -99 SPO 1997 04 14 17 25 31 5.8 -9 674.00 -57.5 -56.4 -57.5 59 -99 SPO 1997 04 14 17 26 31 5.8 -9 674.00 -57.4 -56.4 -57.5 58 -99 SPO 1997 04 14 17 27 30 5.8 -9 674.00 -57.4 -56.4 -57.5 58 -99 SPO 1997 04 14 17 28 31 5.8 -9 674.00 -57.5 -56.4 -57.5 59 -99 SPO 1997 04 14 17 29 30 5.8 -9 674.00 -57.5 -56.5 -57.5 59 -99 SPO 1997 04 14 17 30 31 5.8 -9 674.00 -57.5 -56.5 -57.5 59 -99 SPO 1997 04 14 17 31 32 5.8 -9 674.00 -57.5 -56.5 -57.5 59 -99 SPO 1997 04 14 17 32 31 5.8 -9 674.00 -57.4 -56.5 -57.5 59 -99 SPO 1997 04 14 17 33 31 5.7 -9 674.00 -57.4 -56.5 -57.5 60 -99 SPO 1997 04 14 17 34 30 5.6 -9 674.00 -57.4 -56.5 -57.5 60 -99 SPO 1997 04 14 17 35 30 5.5 -9 674.10 -57.4 -56.5 -57.5 60 -99 SPO 1997 04 14 17 36 30 5.6 -9 674.10 -57.4 -56.5 -57.4 60 -99 SPO 1997 04 14 17 37 31 5.6 -9 674.10 -57.4 -56.5 -57.4 59 -99 SPO 1997 04 14 17 38 31 5.6 -9 674.10 -57.3 -56.5 -57.4 58 -99 SPO 1997 04 14 17 39 31 5.7 -9 674.10 -57.3 -56.6 -57.4 58 -99 SPO 1997 04 14 17 40 31 5.8 -9 674.10 -57.3 -56.6 -57.3 60 -99 SPO 1997 04 14 17 41 31 5.7 -9 674.10 -57.3 -56.6 -57.3 60 -99 SPO 1997 04 14 17 42 30 5.7 -9 674.10 -57.3 -56.6 -57.3 60 -99 SPO 1997 04 14 17 43 29 5.7 -9 674.10 -57.3 -56.6 -57.3 61 -99 SPO 1997 04 14 17 44 29 5.6 -9 674.10 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 45 29 5.6 -9 674.10 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 46 29 5.7 -9 674.10 -57.2 -56.7 -57.3 60 -99 SPO 1997 04 14 17 47 29 5.7 -9 674.20 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 48 28 5.7 -9 674.20 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 49 28 5.7 -9 674.20 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 50 29 5.7 -9 674.20 -57.2 -56.6 -57.4 60 -99 SPO 1997 04 14 17 51 28 5.9 -9 674.20 -57.3 -56.6 -57.3 60 -99 SPO 1997 04 14 17 52 28 5.8 -9 674.10 -57.3 -56.6 -57.3 61 -99 SPO 1997 04 14 17 53 28 5.8 -9 674.10 -57.3 -56.6 -57.4 61 -99 SPO 1997 04 14 17 54 28 5.7 -9 674.20 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 17 55 28 5.8 -9 674.20 -57.3 -56.7 -57.4 61 -99 SPO 1997 04 14 17 56 27 5.8 -9 674.20 -57.3 -56.7 -57.3 61 -99 SPO 1997 04 14 17 57 27 5.8 -9 674.20 -57.3 -56.7 -57.3 61 -99 SPO 1997 04 14 17 58 29 5.8 -9 674.20 -57.3 -56.7 -57.3 61 -99 SPO 1997 04 14 17 59 29 6.1 -9 674.10 -57.3 -56.7 -57.3 61 -99 SPO 1997 04 14 18 00 29 6.2 -9 674.10 -57.3 -56.6 -57.3 61 0 SPO 1997 04 14 18 01 29 6.2 -9 674.10 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 14 18 02 28 6.1 -9 674.10 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 14 18 03 28 6.3 -9 674.10 -57.2 -56.6 -57.2 61 -99 SPO 1997 04 14 18 04 28 6.2 -9 674.10 -57.2 -56.6 -57.2 61 -99 SPO 1997 04 14 18 05 29 6.5 -9 674.10 -57.1 -56.6 -57.2 61 -99 SPO 1997 04 14 18 06 29 6.7 -9 674.10 -57.1 -56.5 -57.1 61 -99 SPO 1997 04 14 18 07 29 6.6 -9 674.10 -57.1 -56.4 -57.1 61 -99 SPO 1997 04 14 18 08 29 6.7 -9 674.20 -57.0 -56.5 -57.1 61 -99 SPO 1997 04 14 18 09 29 6.7 -9 674.20 -57.0 -56.5 -57.1 61 -99 SPO 1997 04 14 18 10 29 6.6 -9 674.20 -57.0 -56.5 -57.0 60 -99 SPO 1997 04 14 18 11 29 6.5 -9 674.20 -57.0 -56.6 -57.1 61 -99 SPO 1997 04 14 18 12 29 6.8 -9 674.20 -57.0 -56.6 -57.0 60 -99 SPO 1997 04 14 18 13 29 6.7 -9 674.20 -56.9 -56.5 -57.0 60 -99 SPO 1997 04 14 18 14 29 6.9 -9 674.20 -56.9 -56.5 -57.0 60 -99 SPO 1997 04 14 18 15 29 6.7 -9 674.20 -56.9 -56.5 -56.9 61 -99 SPO 1997 04 14 18 16 29 6.5 -9 674.20 -56.8 -56.5 -57.0 60 -99 SPO 1997 04 14 18 17 30 6.7 -9 674.20 -56.9 -56.6 -57.0 61 -99 SPO 1997 04 14 18 18 30 6.7 -9 674.20 -56.9 -56.6 -57.0 61 -99 SPO 1997 04 14 18 19 28 6.9 -9 674.20 -56.9 -56.5 -57.0 61 -99 SPO 1997 04 14 18 20 29 7.0 -9 674.20 -56.9 -56.4 -57.0 61 -99 SPO 1997 04 14 18 21 30 7.0 -9 674.20 -56.9 -56.5 -57.0 60 -99 SPO 1997 04 14 18 22 29 7.0 -9 674.20 -56.9 -56.5 -57.0 60 -99 SPO 1997 04 14 18 23 28 6.9 -9 674.20 -56.9 -56.5 -57.0 60 -99 SPO 1997 04 14 18 24 29 6.9 -9 674.20 -56.9 -56.6 -57.1 60 -99 SPO 1997 04 14 18 25 30 6.8 -9 674.20 -57.0 -56.6 -57.1 60 -99 SPO 1997 04 14 18 26 29 7.0 -9 674.20 -57.0 -56.6 -57.1 60 -99 SPO 1997 04 14 18 27 29 7.0 -9 674.20 -57.0 -56.7 -57.2 60 -99 SPO 1997 04 14 18 28 29 6.9 -9 674.20 -57.1 -56.7 -57.2 60 -99 SPO 1997 04 14 18 29 29 7.0 -9 674.20 -57.0 -56.7 -57.2 60 -99 SPO 1997 04 14 18 30 28 6.8 -9 674.20 -57.0 -56.7 -57.2 60 -99 SPO 1997 04 14 18 31 29 7.0 -9 674.20 -57.1 -56.7 -57.2 60 -99 SPO 1997 04 14 18 32 28 7.0 -9 674.20 -57.1 -56.7 -57.2 60 -99 SPO 1997 04 14 18 33 30 6.9 -9 674.20 -57.2 -56.7 -57.3 60 -99 SPO 1997 04 14 18 34 29 7.1 -9 674.20 -57.2 -56.7 -57.3 60 -99 SPO 1997 04 14 18 35 30 7.0 -9 674.20 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 14 18 36 29 7.3 -9 674.20 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 14 18 37 29 7.3 -9 674.20 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 14 18 38 28 7.2 -9 674.20 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 14 18 39 28 7.2 -9 674.20 -57.1 -56.6 -57.1 60 -99 SPO 1997 04 14 18 40 28 7.2 -9 674.20 -57.1 -56.6 -57.1 60 -99 SPO 1997 04 14 18 41 28 7.1 -9 674.20 -57.1 -56.6 -57.2 60 -99 SPO 1997 04 14 18 42 29 6.9 -9 674.20 -57.1 -56.6 -57.2 61 -99 SPO 1997 04 14 18 43 28 6.9 -9 674.30 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 14 18 44 28 6.8 -9 674.30 -57.1 -56.7 -57.1 60 -99 SPO 1997 04 14 18 45 28 6.6 -9 674.30 -57.0 -56.8 -57.1 60 -99 SPO 1997 04 14 18 46 27 6.4 -9 674.30 -57.0 -56.8 -57.2 60 -99 SPO 1997 04 14 18 47 27 6.5 -9 674.30 -57.1 -56.8 -57.2 60 -99 SPO 1997 04 14 18 48 27 6.6 -9 674.30 -57.1 -56.8 -57.2 60 -99 SPO 1997 04 14 18 49 28 6.5 -9 674.30 -57.1 -56.8 -57.2 60 -99 SPO 1997 04 14 18 50 28 6.5 -9 674.30 -57.1 -56.8 -57.2 61 -99 SPO 1997 04 14 18 51 28 6.7 -9 674.30 -57.1 -56.8 -57.2 61 -99 SPO 1997 04 14 18 52 27 6.5 -9 674.40 -57.1 -56.8 -57.1 61 -99 SPO 1997 04 14 18 53 26 6.2 -9 674.40 -57.1 -56.8 -57.2 61 -99 SPO 1997 04 14 18 54 28 6.3 -9 674.30 -57.1 -56.8 -57.2 61 -99 SPO 1997 04 14 18 55 29 6.4 -9 674.30 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 18 56 30 6.5 -9 674.30 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 18 57 30 6.6 -9 674.30 -57.1 -56.9 -57.2 60 -99 SPO 1997 04 14 18 58 30 6.5 -9 674.20 -57.1 -56.9 -57.3 59 -99 SPO 1997 04 14 18 59 30 6.6 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 00 30 6.4 -9 674.30 -57.2 -57.0 -57.3 60 0 SPO 1997 04 14 19 01 29 6.5 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 02 30 6.4 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 03 30 6.4 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 04 30 6.2 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 05 30 6.2 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 06 29 6.4 -9 674.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 07 29 6.3 -9 674.40 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 14 19 08 30 6.1 -9 674.40 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 14 19 09 29 5.9 -9 674.40 -57.3 -57.0 -57.3 60 -99 SPO 1997 04 14 19 10 30 6.0 -9 674.40 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 14 19 11 30 5.8 -9 674.40 -57.3 -57.0 -57.3 60 -99 SPO 1997 04 14 19 12 31 5.8 -9 674.40 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 14 19 13 31 5.8 -9 674.40 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 14 19 14 31 5.7 -9 674.40 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 14 19 15 32 6.0 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 16 33 5.4 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 17 34 5.4 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 18 36 5.6 -9 674.40 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 14 19 19 36 5.6 -9 674.40 -57.4 -57.1 -57.4 60 -99 SPO 1997 04 14 19 20 35 5.6 -9 674.40 -57.4 -57.2 -57.4 60 -99 SPO 1997 04 14 19 21 36 5.5 -9 674.40 -57.4 -57.2 -57.4 60 -99 SPO 1997 04 14 19 22 37 5.7 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 23 36 5.5 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 24 35 5.7 -9 674.40 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 25 33 5.7 -9 674.40 -57.3 -57.1 -57.3 61 -99 SPO 1997 04 14 19 26 33 5.4 -9 674.40 -57.3 -57.1 -57.3 61 -99 SPO 1997 04 14 19 27 31 5.4 -9 674.50 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 14 19 28 30 5.5 -9 674.50 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 14 19 29 29 5.5 -9 674.50 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 14 19 30 29 5.6 -9 674.50 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 14 19 31 28 5.8 -9 674.50 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 14 19 32 26 5.7 -9 674.50 -57.3 -57.3 -57.3 60 -99 SPO 1997 04 14 19 33 25 6.3 -9 674.50 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 14 19 34 25 6.3 -9 674.50 -57.2 -57.3 -57.4 59 -99 SPO 1997 04 14 19 35 22 6.8 -9 674.50 -57.2 -57.2 -57.4 60 -99 SPO 1997 04 14 19 36 24 6.7 -9 674.40 -57.3 -57.3 -57.4 61 -99 SPO 1997 04 14 19 37 23 6.8 -9 674.40 -57.3 -57.3 -57.4 61 -99 SPO 1997 04 14 19 38 23 6.6 -9 674.40 -57.3 -57.2 -57.5 60 -99 SPO 1997 04 14 19 39 21 7.3 -9 674.40 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 14 19 40 20 7.4 -9 674.40 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 14 19 41 20 7.7 -9 674.40 -57.4 -57.2 -57.5 59 -99 SPO 1997 04 14 19 42 19 7.7 -9 674.30 -57.4 -57.2 -57.5 58 -99 SPO 1997 04 14 19 43 19 7.9 -9 674.30 -57.4 -57.3 -57.5 58 -99 SPO 1997 04 14 19 44 18 7.9 -9 674.30 -57.4 -57.3 -57.5 58 -99 SPO 1997 04 14 19 45 18 8.1 -9 674.30 -57.4 -57.3 -57.5 57 -99 SPO 1997 04 14 19 46 17 8.2 -9 674.30 -57.4 -57.3 -57.5 58 -99 SPO 1997 04 14 19 47 16 8.1 -9 674.30 -57.4 -57.3 -57.6 58 -99 SPO 1997 04 14 19 48 14 8.3 -9 674.30 -57.5 -57.3 -57.5 59 -99 SPO 1997 04 14 19 49 12 8.3 -9 674.30 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 14 19 50 11 8.8 -9 674.30 -57.4 -57.3 -57.6 59 -99 SPO 1997 04 14 19 51 10 8.9 -9 674.30 -57.4 -57.3 -57.5 59 -99 SPO 1997 04 14 19 52 9 9.0 -9 674.30 -57.4 -57.3 -57.5 59 -99 SPO 1997 04 14 19 53 8 9.5 -9 674.30 -57.4 -57.3 -57.5 59 -99 SPO 1997 04 14 19 54 8 9.5 -9 674.30 -57.4 -57.2 -57.5 58 -99 SPO 1997 04 14 19 55 7 9.6 -9 674.30 -57.4 -57.2 -57.5 58 -99 SPO 1997 04 14 19 56 7 9.4 -9 674.30 -57.4 -57.2 -57.5 58 -99 SPO 1997 04 14 19 57 6 9.7 -9 674.30 -57.4 -57.2 -57.5 59 -99 SPO 1997 04 14 19 58 6 9.7 -9 674.20 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 14 19 59 6 9.8 -9 674.20 -57.4 -57.1 -57.5 60 -99 SPO 1997 04 14 20 00 6 9.7 -9 674.30 -57.4 -57.1 -57.5 60 0 SPO 1997 04 14 20 01 5 9.3 -9 674.30 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 14 20 02 5 9.6 -9 674.30 -57.4 -57.1 -57.5 60 -99 SPO 1997 04 14 20 03 4 9.6 -9 674.30 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 14 20 04 5 9.8 -9 674.30 -57.4 -57.2 -57.5 60 -99 SPO 1997 04 14 20 05 4 9.6 -9 674.30 -57.4 -57.2 -57.5 59 -99 SPO 1997 04 14 20 06 5 9.5 -9 674.30 -57.4 -57.2 -57.5 59 -99 SPO 1997 04 14 20 07 5 9.8 -9 674.30 -57.4 -57.2 -57.5 58 -99 SPO 1997 04 14 20 08 4 9.5 -9 674.30 -57.4 -57.2 -57.5 59 -99 SPO 1997 04 14 20 09 4 9.8 -9 674.30 -57.4 -57.2 -57.6 59 -99 SPO 1997 04 14 20 10 5 9.9 -9 674.30 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 14 20 11 5 9.5 -9 674.40 -57.5 -57.1 -57.6 62 -99 SPO 1997 04 14 20 12 6 9.6 -9 674.40 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 14 20 13 8 9.6 -9 674.40 -57.5 -57.1 -57.6 62 -99 SPO 1997 04 14 20 14 8 9.5 -9 674.40 -57.5 -57.1 -57.6 62 -99 SPO 1997 04 14 20 15 8 9.1 -9 674.40 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 14 20 16 10 9.2 -9 674.40 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 14 20 17 11 8.9 -9 674.40 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 14 20 18 10 8.4 -9 674.50 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 14 20 19 10 8.3 -9 674.50 -57.6 -57.2 -57.7 60 -99 SPO 1997 04 14 20 20 10 8.1 -9 674.50 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 21 8 8.1 -9 674.60 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 22 8 8.1 -9 674.60 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 14 20 23 8 7.8 -9 674.60 -57.7 -57.5 -57.8 63 -99 SPO 1997 04 14 20 24 7 8.0 -9 674.60 -57.7 -57.5 -57.8 63 -99 SPO 1997 04 14 20 25 7 8.4 -9 674.60 -57.7 -57.4 -57.8 61 -99 SPO 1997 04 14 20 26 8 8.6 -9 674.60 -57.7 -57.3 -57.7 61 -99 SPO 1997 04 14 20 27 8 8.7 -9 674.60 -57.6 -57.3 -57.6 60 -99 SPO 1997 04 14 20 28 7 8.4 -9 674.60 -57.6 -57.3 -57.6 60 -99 SPO 1997 04 14 20 29 8 8.7 -9 674.60 -57.6 -57.3 -57.6 60 -99 SPO 1997 04 14 20 30 8 8.7 -9 674.60 -57.6 -57.3 -57.6 59 -99 SPO 1997 04 14 20 31 8 8.6 -9 674.70 -57.6 -57.3 -57.7 60 -99 SPO 1997 04 14 20 32 8 8.3 -9 674.70 -57.6 -57.3 -57.7 60 -99 SPO 1997 04 14 20 33 7 8.4 -9 674.70 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 34 7 8.4 -9 674.70 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 35 7 8.4 -9 674.70 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 36 7 8.4 -9 674.70 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 14 20 37 7 8.8 -9 674.70 -57.6 -57.5 -57.7 60 -99 SPO 1997 04 14 20 38 6 8.7 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 39 5 8.8 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 40 5 8.6 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 41 7 9.1 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 42 7 8.8 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 43 7 8.8 -9 674.70 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 14 20 44 7 8.9 -9 674.70 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 14 20 45 7 9.2 -9 674.70 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 14 20 46 6 9.1 -9 674.70 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 14 20 47 6 9.1 -9 674.70 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 14 20 48 6 9.0 -9 674.70 -57.6 -57.4 -57.7 63 -99 SPO 1997 04 14 20 49 6 9.1 -9 674.70 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 14 20 50 6 9.0 -9 674.70 -57.6 -57.4 -57.8 59 -99 SPO 1997 04 14 20 51 6 9.0 -9 674.70 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 14 20 52 6 8.9 -9 674.70 -57.6 -57.5 -57.8 59 -99 SPO 1997 04 14 20 53 7 8.4 -9 674.70 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 14 20 54 8 8.5 -9 674.70 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 14 20 55 9 8.8 -9 674.70 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 14 20 56 8 8.7 -9 674.70 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 14 20 57 8 8.5 -9 674.80 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 14 20 58 8 8.7 -9 674.80 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 14 20 59 8 8.8 -9 674.80 -57.7 -57.5 -57.8 61 -99 SPO 1997 04 14 21 00 8 8.3 -9 674.80 -57.7 -57.5 -57.8 61 0 SPO 1997 04 14 21 01 8 8.4 -9 674.80 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 14 21 02 8 8.2 -9 674.80 -57.7 -57.5 -57.9 60 -99 SPO 1997 04 14 21 03 7 8.1 -9 674.90 -57.8 -57.5 -57.9 61 -99 SPO 1997 04 14 21 04 6 8.2 -9 674.90 -57.8 -57.5 -57.9 60 -99 SPO 1997 04 14 21 05 6 8.3 -9 674.90 -57.8 -57.5 -57.9 59 -99 SPO 1997 04 14 21 06 5 8.1 -9 675.00 -57.8 -57.6 -57.9 59 -99 SPO 1997 04 14 21 07 5 8.0 -9 675.00 -57.8 -57.6 -57.9 59 -99 SPO 1997 04 14 21 08 5 8.4 -9 675.00 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 14 21 09 5 8.3 -9 675.00 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 14 21 10 5 8.3 -9 675.00 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 14 21 11 5 8.4 -9 675.00 -57.8 -57.8 -57.9 60 -99 SPO 1997 04 14 21 12 5 8.4 -9 675.00 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 14 21 13 5 8.3 -9 675.00 -57.9 -57.7 -58.0 60 -99 SPO 1997 04 14 21 14 6 8.4 -9 675.00 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 14 21 15 7 8.2 -9 675.00 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 14 21 16 7 8.3 -9 675.00 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 14 21 17 8 8.4 -9 675.00 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 14 21 18 7 8.4 -9 675.00 -57.9 -57.8 -58.0 59 -99 SPO 1997 04 14 21 19 8 8.2 -9 675.00 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 14 21 20 9 8.4 -9 675.00 -57.9 -57.7 -58.1 59 -99 SPO 1997 04 14 21 21 9 8.6 -9 675.00 -58.0 -57.7 -58.1 60 -99 SPO 1997 04 14 21 22 8 8.4 -9 675.00 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 14 21 23 8 8.3 -9 675.00 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 14 21 24 8 8.5 -9 675.00 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 14 21 25 8 8.5 -9 675.00 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 26 7 8.3 -9 675.00 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 27 7 8.3 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 28 6 8.4 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 29 6 8.0 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 30 7 8.3 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 31 8 8.4 -9 675.00 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 32 8 8.3 -9 675.00 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 33 8 8.5 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 34 8 8.5 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 35 9 8.7 -9 675.00 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 36 9 8.6 -9 675.00 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 14 21 37 8 8.8 -9 675.00 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 14 21 38 8 8.4 -9 675.00 -58.0 -57.9 -58.1 58 -99 SPO 1997 04 14 21 39 8 8.8 -9 675.10 -58.0 -57.9 -58.1 58 -99 SPO 1997 04 14 21 40 7 8.8 -9 675.10 -58.0 -58.0 -58.1 59 -99 SPO 1997 04 14 21 41 7 8.9 -9 675.10 -58.0 -58.0 -58.1 59 -99 SPO 1997 04 14 21 42 7 8.7 -9 675.10 -58.0 -58.0 -58.1 59 -99 SPO 1997 04 14 21 43 6 8.6 -9 675.10 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 44 6 8.7 -9 675.10 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 45 8 8.9 -9 675.10 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 46 8 8.7 -9 675.10 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 47 7 8.8 -9 675.10 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 48 7 8.6 -9 675.20 -57.9 -57.9 -58.0 59 -99 SPO 1997 04 14 21 49 6 8.7 -9 675.20 -57.9 -57.9 -58.0 59 -99 SPO 1997 04 14 21 50 6 8.7 -9 675.20 -57.9 -57.9 -58.1 59 -99 SPO 1997 04 14 21 51 5 8.5 -9 675.20 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 14 21 52 7 8.6 -9 675.20 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 53 6 8.6 -9 675.20 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 21 54 7 8.8 -9 675.20 -57.9 -57.9 -58.0 60 -99 SPO 1997 04 14 21 55 6 8.5 -9 675.30 -57.9 -57.9 -58.0 60 -99 SPO 1997 04 14 21 56 6 8.3 -9 675.30 -57.9 -58.0 -58.0 61 -99 SPO 1997 04 14 21 57 4 8.4 -9 675.40 -57.9 -58.0 -58.0 61 -99 SPO 1997 04 14 21 58 4 8.2 -9 675.40 -57.9 -58.0 -58.0 60 -99 SPO 1997 04 14 21 59 5 8.3 -9 675.40 -58.0 -58.0 -58.0 61 -99 SPO 1997 04 14 22 00 6 8.7 -9 675.40 -58.0 -58.0 -58.0 61 0 SPO 1997 04 14 22 01 5 7.9 -9 675.40 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 14 22 02 4 8.1 -9 675.40 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 14 22 03 5 8.4 -9 675.40 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 14 22 04 4 8.0 -9 675.40 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 14 22 05 3 7.9 -9 675.50 -58.0 -58.0 -58.1 60 -99 SPO 1997 04 14 22 06 3 7.8 -9 675.50 -58.0 -58.0 -58.2 61 -99 SPO 1997 04 14 22 07 5 8.0 -9 675.50 -58.0 -58.0 -58.2 61 -99 SPO 1997 04 14 22 08 5 7.9 -9 675.50 -58.0 -58.0 -58.2 61 -99 SPO 1997 04 14 22 09 5 7.8 -9 675.50 -58.0 -58.0 -58.2 60 -99 SPO 1997 04 14 22 10 6 7.8 -9 675.50 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 14 22 11 6 8.1 -9 675.50 -58.1 -58.1 -58.2 59 -99 SPO 1997 04 14 22 12 7 7.7 -9 675.50 -58.1 -58.0 -58.2 59 -99 SPO 1997 04 14 22 13 7 7.9 -9 675.50 -58.1 -58.0 -58.2 59 -99 SPO 1997 04 14 22 14 5 7.4 -9 675.50 -58.1 -58.1 -58.2 60 -99 SPO 1997 04 14 22 15 7 7.7 -9 675.60 -58.1 -58.1 -58.2 60 -99 SPO 1997 04 14 22 16 8 7.6 -9 675.50 -58.1 -58.1 -58.2 61 -99 SPO 1997 04 14 22 17 10 8.3 -9 675.50 -58.1 -58.0 -58.2 61 -99 SPO 1997 04 14 22 18 7 7.9 -9 675.50 -58.1 -58.0 -58.2 61 -99 SPO 1997 04 14 22 19 359 5.5 -9 675.70 -58.1 -58.0 -58.2 61 -99 SPO 1997 04 14 22 20 8 7.5 -9 675.60 -58.1 -58.1 -58.2 61 -99 SPO 1997 04 14 22 21 7 7.6 -9 675.60 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 14 22 22 5 7.4 -9 675.70 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 14 22 23 4 7.4 -9 675.60 -58.1 -58.0 -58.2 59 -99 SPO 1997 04 14 22 24 5 7.7 -9 675.60 -58.1 -58.0 -58.2 59 -99 SPO 1997 04 14 22 25 4 7.3 -9 675.60 -58.1 -58.0 -58.2 59 -99 SPO 1997 04 14 22 26 5 7.6 -9 675.70 -58.1 -58.1 -58.3 59 -99 SPO 1997 04 14 22 27 4 7.3 -9 675.70 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 14 22 28 3 7.0 -9 675.70 -58.2 -58.2 -58.3 60 -99 SPO 1997 04 14 22 29 3 7.2 -9 675.80 -58.2 -58.2 -58.3 60 -99 SPO 1997 04 14 22 30 3 7.2 -9 675.80 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 14 22 31 3 7.1 -9 675.80 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 14 22 32 3 7.1 -9 675.80 -58.2 -58.1 -58.4 59 -99 SPO 1997 04 14 22 33 2 7.0 -9 675.90 -58.3 -58.1 -58.4 60 -99 SPO 1997 04 14 22 34 1 6.8 -9 675.90 -58.3 -58.1 -58.4 59 -99 SPO 1997 04 14 22 35 2 6.9 -9 675.90 -58.3 -58.1 -58.4 59 -99 SPO 1997 04 14 22 36 3 6.8 -9 675.90 -58.3 -58.1 -58.4 59 -99 SPO 1997 04 14 22 37 3 6.8 -9 675.90 -58.3 -58.0 -58.4 59 -99 SPO 1997 04 14 22 38 4 7.0 -9 675.90 -58.3 -58.0 -58.4 59 -99 SPO 1997 04 14 22 39 4 7.0 -9 675.90 -58.3 -58.0 -58.4 59 -99 SPO 1997 04 14 22 40 4 7.1 -9 675.90 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 22 41 4 7.0 -9 675.90 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 22 42 5 6.8 -9 675.90 -58.4 -58.0 -58.5 59 -99 SPO 1997 04 14 22 43 4 7.3 -9 675.90 -58.4 -58.0 -58.5 59 -99 SPO 1997 04 14 22 44 3 7.0 -9 675.90 -58.4 -58.1 -58.5 59 -99 SPO 1997 04 14 22 45 4 7.2 -9 675.90 -58.4 -58.1 -58.5 59 -99 SPO 1997 04 14 22 46 6 7.4 -9 675.80 -58.4 -58.0 -58.5 59 -99 SPO 1997 04 14 22 47 5 7.4 -9 675.90 -58.4 -58.0 -58.4 59 -99 SPO 1997 04 14 22 48 4 7.3 -9 675.90 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 22 49 4 7.4 -9 675.90 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 22 50 3 7.4 -9 675.90 -58.4 -58.0 -58.4 60 -99 SPO 1997 04 14 22 51 3 7.3 -9 675.90 -58.4 -58.0 -58.4 60 -99 SPO 1997 04 14 22 52 3 7.3 -9 675.90 -58.4 -58.0 -58.4 61 -99 SPO 1997 04 14 22 53 2 7.2 -9 676.00 -58.4 -58.0 -58.4 61 -99 SPO 1997 04 14 22 54 1 7.3 -9 676.00 -58.3 -57.9 -58.4 59 -99 SPO 1997 04 14 22 55 2 7.1 -9 676.00 -58.3 -57.9 -58.4 59 -99 SPO 1997 04 14 22 56 3 7.2 -9 676.00 -58.3 -57.9 -58.4 59 -99 SPO 1997 04 14 22 57 1 7.3 -9 676.00 -58.3 -57.9 -58.4 58 -99 SPO 1997 04 14 22 58 1 7.4 -9 676.00 -58.3 -58.0 -58.4 58 -99 SPO 1997 04 14 22 59 1 7.3 -9 676.00 -58.4 -58.0 -58.4 59 -99 SPO 1997 04 14 23 00 0 7.5 -9 676.00 -58.4 -58.0 -58.5 59 0 SPO 1997 04 14 23 01 1 7.6 -9 676.00 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 23 02 0 7.5 -9 676.00 -58.4 -58.0 -58.5 60 -99 SPO 1997 04 14 23 03 1 7.6 -9 676.00 -58.4 -58.0 -58.5 61 -99 SPO 1997 04 14 23 04 1 7.5 -9 676.00 -58.4 -58.0 -58.6 61 -99 SPO 1997 04 14 23 05 1 7.7 -9 676.00 -58.4 -58.0 -58.6 61 -99 SPO 1997 04 14 23 06 360 7.8 -9 676.10 -58.5 -57.9 -58.6 61 -99 SPO 1997 04 14 23 07 360 7.5 -9 676.10 -58.5 -58.0 -58.6 60 -99 SPO 1997 04 14 23 08 1 7.4 -9 676.10 -58.5 -58.0 -58.6 60 -99 SPO 1997 04 14 23 09 0 7.4 -9 676.10 -58.5 -58.0 -58.7 59 -99 SPO 1997 04 14 23 10 0 7.5 -9 676.10 -58.6 -58.0 -58.7 59 -99 SPO 1997 04 14 23 11 360 7.4 -9 676.10 -58.6 -57.9 -58.7 59 -99 SPO 1997 04 14 23 12 0 7.3 -9 676.20 -58.6 -58.0 -58.7 59 -99 SPO 1997 04 14 23 13 0 7.3 -9 676.20 -58.6 -58.0 -58.8 59 -99 SPO 1997 04 14 23 14 360 7.3 -9 676.20 -58.7 -58.0 -58.8 60 -99 SPO 1997 04 14 23 15 359 7.2 -9 676.20 -58.7 -58.0 -58.8 60 -99 SPO 1997 04 14 23 16 360 7.1 -9 676.20 -58.7 -58.1 -58.8 60 -99 SPO 1997 04 14 23 17 0 7.0 -9 676.20 -58.8 -58.0 -58.8 60 -99 SPO 1997 04 14 23 18 1 7.2 -9 676.20 -58.8 -58.0 -58.9 59 -99 SPO 1997 04 14 23 19 1 7.2 -9 676.20 -58.8 -58.0 -58.9 59 -99 SPO 1997 04 14 23 20 1 7.3 -9 676.20 -58.8 -58.0 -58.9 58 -99 SPO 1997 04 14 23 21 360 7.2 -9 676.20 -58.9 -58.0 -58.9 59 -99 SPO 1997 04 14 23 22 1 7.4 -9 676.20 -58.9 -57.9 -59.0 59 -99 SPO 1997 04 14 23 23 1 7.2 -9 676.20 -58.9 -57.9 -59.0 59 -99 SPO 1997 04 14 23 24 359 7.1 -9 676.20 -58.9 -57.9 -59.0 59 -99 SPO 1997 04 14 23 25 360 7.3 -9 676.20 -58.9 -57.9 -59.0 59 -99 SPO 1997 04 14 23 26 359 7.1 -9 676.20 -58.9 -57.9 -59.0 59 -99 SPO 1997 04 14 23 27 359 7.3 -9 676.20 -59.0 -57.9 -59.0 60 -99 SPO 1997 04 14 23 28 359 7.4 -9 676.20 -59.0 -58.0 -59.1 59 -99 SPO 1997 04 14 23 29 359 7.4 -9 676.20 -59.0 -58.0 -59.0 59 -99 SPO 1997 04 14 23 30 358 7.5 -9 676.20 -59.0 -58.0 -59.1 58 -99 SPO 1997 04 14 23 31 359 7.5 -9 676.20 -59.0 -57.9 -59.1 58 -99 SPO 1997 04 14 23 32 358 7.5 -9 676.30 -59.1 -58.0 -59.2 58 -99 SPO 1997 04 14 23 33 357 7.4 -9 676.30 -59.1 -57.9 -59.1 58 -99 SPO 1997 04 14 23 34 357 7.4 -9 676.30 -59.1 -57.9 -59.2 58 -99 SPO 1997 04 14 23 35 357 7.3 -9 676.30 -59.1 -57.9 -59.2 58 -99 SPO 1997 04 14 23 36 357 7.0 -9 676.40 -59.1 -57.9 -59.2 58 -99 SPO 1997 04 14 23 37 357 6.9 -9 676.40 -59.1 -57.9 -59.2 59 -99 SPO 1997 04 14 23 38 358 7.2 -9 676.40 -59.1 -57.9 -59.2 59 -99 SPO 1997 04 14 23 39 358 7.2 -9 676.40 -59.2 -57.9 -59.2 60 -99 SPO 1997 04 14 23 40 358 7.1 -9 676.40 -59.2 -57.8 -59.3 60 -99 SPO 1997 04 14 23 41 358 6.8 -9 676.40 -59.2 -57.8 -59.3 59 -99 SPO 1997 04 14 23 42 359 7.1 -9 676.40 -59.2 -57.8 -59.3 59 -99 SPO 1997 04 14 23 43 359 7.0 -9 676.50 -59.2 -57.8 -59.3 58 -99 SPO 1997 04 14 23 44 358 6.9 -9 676.50 -59.2 -57.8 -59.3 58 -99 SPO 1997 04 14 23 45 359 7.0 -9 676.50 -59.2 -57.9 -59.3 58 -99 SPO 1997 04 14 23 46 358 6.8 -9 676.50 -59.3 -57.9 -59.3 59 -99 SPO 1997 04 14 23 47 358 6.7 -9 676.50 -59.3 -57.9 -59.4 59 -99 SPO 1997 04 14 23 48 358 6.7 -9 676.50 -59.3 -57.9 -59.4 59 -99 SPO 1997 04 14 23 49 359 6.9 -9 676.50 -59.3 -57.9 -59.4 58 -99 SPO 1997 04 14 23 50 360 7.0 -9 676.50 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 14 23 51 360 6.9 -9 676.50 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 14 23 52 0 7.1 -9 676.50 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 14 23 53 1 7.0 -9 676.50 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 14 23 54 1 7.2 -9 676.50 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 14 23 55 1 7.2 -9 676.50 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 14 23 56 2 7.2 -9 676.50 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 14 23 57 2 7.3 -9 676.50 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 14 23 58 2 7.3 -9 676.50 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 14 23 59 1 7.4 -9 676.50 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 00 1 7.5 -9 676.50 -59.4 -57.9 -59.6 -99 0 SPO 1997 04 15 00 01 1 7.5 -9 676.60 -59.4 -57.9 -59.6 -99 -99 SPO 1997 04 15 00 02 1 7.5 -9 676.60 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 03 1 7.6 -9 676.60 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 04 1 7.5 -9 676.60 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 05 0 7.4 -9 676.70 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 06 1 7.2 -9 676.70 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 07 1 7.3 -9 676.70 -59.4 -57.9 -59.5 -99 -99 SPO 1997 04 15 00 08 2 7.3 -9 676.70 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 09 2 7.5 -9 676.70 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 10 2 7.3 -9 676.70 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 11 2 7.3 -9 676.70 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 12 2 7.2 -9 676.70 -59.4 -57.8 -59.5 -99 -99 SPO 1997 04 15 00 13 2 7.3 -9 676.70 -59.4 -57.7 -59.5 58 -99 SPO 1997 04 15 00 14 2 7.3 -9 676.70 -59.4 -57.7 -59.5 58 -99 SPO 1997 04 15 00 15 2 7.3 -9 676.80 -59.4 -57.7 -59.5 57 -99 SPO 1997 04 15 00 16 2 7.4 -9 676.80 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 15 00 17 2 7.4 -9 676.80 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 15 00 18 2 7.4 -9 676.80 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 15 00 19 2 7.2 -9 676.80 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 15 00 20 1 7.3 -9 676.80 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 21 1 7.3 -9 676.80 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 22 1 7.4 -9 676.90 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 00 23 1 7.4 -9 676.90 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 00 24 2 7.5 -9 676.90 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 25 2 7.4 -9 676.90 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 26 2 7.5 -9 676.90 -59.4 -57.8 -59.5 59 -99 SPO 1997 04 15 00 27 2 7.4 -9 676.90 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 28 2 7.4 -9 676.90 -59.4 -57.7 -59.5 59 -99 SPO 1997 04 15 00 29 2 7.3 -9 676.90 -59.4 -57.7 -59.4 58 -99 SPO 1997 04 15 00 30 2 7.5 -9 676.90 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 31 2 7.5 -9 676.90 -59.4 -57.8 -59.4 58 -99 SPO 1997 04 15 00 32 2 7.4 -9 676.90 -59.4 -57.8 -59.4 59 -99 SPO 1997 04 15 00 33 2 7.5 -9 676.90 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 15 00 34 2 7.5 -9 676.90 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 15 00 35 1 7.4 -9 676.90 -59.4 -57.9 -59.4 60 -99 SPO 1997 04 15 00 36 1 7.4 -9 677.00 -59.4 -57.9 -59.4 60 -99 SPO 1997 04 15 00 37 2 7.5 -9 677.00 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 15 00 38 2 7.5 -9 677.00 -59.4 -57.9 -59.5 59 -99 SPO 1997 04 15 00 39 1 7.6 -9 677.00 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 00 40 2 7.6 -9 677.00 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 00 41 2 7.5 -9 677.00 -59.4 -57.8 -59.6 58 -99 SPO 1997 04 15 00 42 2 7.7 -9 677.00 -59.4 -57.8 -59.6 58 -99 SPO 1997 04 15 00 43 1 7.7 -9 677.00 -59.4 -57.8 -59.5 58 -99 SPO 1997 04 15 00 44 2 7.6 -9 677.10 -59.5 -57.8 -59.5 60 -99 SPO 1997 04 15 00 45 0 7.5 -9 677.10 -59.5 -57.7 -59.6 59 -99 SPO 1997 04 15 00 46 0 7.6 -9 677.10 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 47 360 7.6 -9 677.10 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 48 359 7.7 -9 677.20 -59.5 -57.8 -59.5 60 -99 SPO 1997 04 15 00 49 359 7.8 -9 677.20 -59.5 -57.9 -59.6 60 -99 SPO 1997 04 15 00 50 360 7.8 -9 677.20 -59.5 -57.9 -59.6 59 -99 SPO 1997 04 15 00 51 0 7.8 -9 677.20 -59.6 -57.8 -59.6 60 -99 SPO 1997 04 15 00 52 360 7.8 -9 677.20 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 53 360 7.6 -9 677.20 -59.5 -57.9 -59.6 58 -99 SPO 1997 04 15 00 54 0 7.6 -9 677.20 -59.5 -57.9 -59.6 59 -99 SPO 1997 04 15 00 55 0 7.7 -9 677.20 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 56 1 7.7 -9 677.30 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 57 1 7.7 -9 677.20 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 58 1 7.6 -9 677.30 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 00 59 1 7.7 -9 677.30 -59.5 -57.8 -59.6 59 -99 SPO 1997 04 15 01 00 1 7.8 -9 677.30 -59.6 -57.8 -59.6 59 0 SPO 1997 04 15 01 01 1 7.5 -9 677.30 -59.5 -57.8 -59.6 57 -99 SPO 1997 04 15 01 02 1 7.5 -9 677.30 -59.5 -57.9 -59.6 57 -99 SPO 1997 04 15 01 03 1 7.6 -9 677.30 -59.6 -57.9 -59.6 57 -99 SPO 1997 04 15 01 04 2 7.6 -9 677.30 -59.6 -57.9 -59.7 58 -99 SPO 1997 04 15 01 05 2 7.6 -9 677.30 -59.6 -57.9 -59.6 58 -99 SPO 1997 04 15 01 06 2 7.6 -9 677.30 -59.6 -57.9 -59.7 59 -99 SPO 1997 04 15 01 07 3 7.7 -9 677.30 -59.6 -57.9 -59.7 59 -99 SPO 1997 04 15 01 08 3 7.7 -9 677.30 -59.6 -57.9 -59.7 60 -99 SPO 1997 04 15 01 09 3 7.8 -9 677.30 -59.6 -57.9 -59.7 60 -99 SPO 1997 04 15 01 10 2 7.6 -9 677.30 -59.6 -57.9 -59.7 60 -99 SPO 1997 04 15 01 11 2 7.6 -9 677.30 -59.7 -57.9 -59.7 60 -99 SPO 1997 04 15 01 12 2 7.5 -9 677.30 -59.7 -57.8 -59.7 60 -99 SPO 1997 04 15 01 13 3 7.7 -9 677.30 -59.7 -57.8 -59.8 60 -99 SPO 1997 04 15 01 14 4 7.8 -9 677.30 -59.7 -57.8 -59.8 60 -99 SPO 1997 04 15 01 15 3 7.7 -9 677.30 -59.7 -57.7 -59.7 59 -99 SPO 1997 04 15 01 16 3 7.8 -9 677.30 -59.7 -57.7 -59.7 58 -99 SPO 1997 04 15 01 17 3 7.9 -9 677.30 -59.7 -57.7 -59.7 58 -99 SPO 1997 04 15 01 18 4 8.1 -9 677.30 -59.7 -57.7 -59.6 59 -99 SPO 1997 04 15 01 19 4 7.9 -9 677.30 -59.6 -57.6 -59.6 58 -99 SPO 1997 04 15 01 20 4 8.1 -9 677.30 -59.6 -57.6 -59.7 59 -99 SPO 1997 04 15 01 21 4 8.3 -9 677.30 -59.6 -57.6 -59.6 59 -99 SPO 1997 04 15 01 22 4 8.2 -9 677.30 -59.6 -57.6 -59.6 60 -99 SPO 1997 04 15 01 23 4 8.1 -9 677.30 -59.6 -57.5 -59.7 59 -99 SPO 1997 04 15 01 24 5 8.1 -9 677.30 -59.6 -57.5 -59.7 59 -99 SPO 1997 04 15 01 25 5 7.9 -9 677.30 -59.6 -57.5 -59.7 59 -99 SPO 1997 04 15 01 26 4 8.0 -9 677.30 -59.6 -57.6 -59.7 58 -99 SPO 1997 04 15 01 27 6 8.8 -9 677.30 -59.6 -57.6 -59.7 58 -99 SPO 1997 04 15 01 28 4 7.9 -9 677.40 -59.6 -57.5 -59.6 58 -99 SPO 1997 04 15 01 29 4 8.2 -9 677.40 -59.6 -57.5 -59.7 58 -99 SPO 1997 04 15 01 30 5 8.4 -9 677.30 -59.7 -57.5 -59.7 59 -99 SPO 1997 04 15 01 31 5 8.4 -9 677.30 -59.6 -57.4 -59.7 58 -99 SPO 1997 04 15 01 32 4 8.4 -9 677.40 -59.7 -57.5 -59.7 59 -99 SPO 1997 04 15 01 33 5 8.4 -9 677.40 -59.6 -57.5 -59.7 58 -99 SPO 1997 04 15 01 34 5 8.3 -9 677.40 -59.6 -57.6 -59.7 58 -99 SPO 1997 04 15 01 35 4 8.3 -9 677.40 -59.6 -57.6 -59.7 58 -99 SPO 1997 04 15 01 36 4 8.3 -9 677.40 -59.6 -57.6 -59.6 58 -99 SPO 1997 04 15 01 37 4 8.3 -9 677.40 -59.6 -57.6 -59.6 57 -99 SPO 1997 04 15 01 38 5 8.2 -9 677.40 -59.6 -57.6 -59.6 57 -99 SPO 1997 04 15 01 39 5 8.3 -9 677.40 -59.6 -57.6 -59.6 58 -99 SPO 1997 04 15 01 40 5 8.2 -9 677.40 -59.6 -57.6 -59.6 59 -99 SPO 1997 04 15 01 41 5 8.1 -9 677.40 -59.5 -57.6 -59.6 58 -99 SPO 1997 04 15 01 42 5 8.1 -9 677.40 -59.6 -57.6 -59.6 59 -99 SPO 1997 04 15 01 43 6 8.2 -9 677.40 -59.5 -57.5 -59.6 58 -99 SPO 1997 04 15 01 44 5 8.2 -9 677.50 -59.5 -57.5 -59.6 59 -99 SPO 1997 04 15 01 45 6 8.2 -9 677.40 -59.5 -57.5 -59.6 59 -99 SPO 1997 04 15 01 46 6 8.3 -9 677.50 -59.5 -57.4 -59.6 58 -99 SPO 1997 04 15 01 47 6 8.3 -9 677.50 -59.5 -57.5 -59.6 58 -99 SPO 1997 04 15 01 48 5 8.3 -9 677.50 -59.5 -57.5 -59.6 58 -99 SPO 1997 04 15 01 49 5 8.2 -9 677.50 -59.5 -57.5 -59.6 58 -99 SPO 1997 04 15 01 50 5 8.3 -9 677.50 -59.5 -57.5 -59.6 57 -99 SPO 1997 04 15 01 51 5 8.2 -9 677.50 -59.5 -57.5 -59.5 58 -99 SPO 1997 04 15 01 52 5 8.2 -9 677.50 -59.5 -57.5 -59.5 58 -99 SPO 1997 04 15 01 53 5 8.2 -9 677.60 -59.5 -57.5 -59.5 58 -99 SPO 1997 04 15 01 54 4 8.4 -9 677.50 -59.5 -57.4 -59.5 58 -99 SPO 1997 04 15 01 55 4 8.5 -9 677.60 -59.5 -57.4 -59.5 59 -99 SPO 1997 04 15 01 56 5 8.4 -9 677.60 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 01 57 5 8.4 -9 677.60 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 01 58 6 8.4 -9 677.60 -59.4 -57.4 -59.4 58 -99 SPO 1997 04 15 01 59 6 8.4 -9 677.60 -59.4 -57.4 -59.4 58 -99 SPO 1997 04 15 02 00 6 8.4 -9 677.60 -59.4 -57.4 -59.5 58 0 SPO 1997 04 15 02 01 7 8.4 -9 677.60 -59.4 -57.4 -59.4 58 -99 SPO 1997 04 15 02 02 7 8.6 -9 677.60 -59.4 -57.4 -59.4 58 -99 SPO 1997 04 15 02 03 7 8.5 -9 677.60 -59.3 -57.4 -59.4 58 -99 SPO 1997 04 15 02 04 6 8.4 -9 677.60 -59.4 -57.4 -59.4 59 -99 SPO 1997 04 15 02 05 6 8.5 -9 677.70 -59.4 -57.4 -59.4 60 -99 SPO 1997 04 15 02 06 6 8.4 -9 677.70 -59.3 -57.4 -59.4 59 -99 SPO 1997 04 15 02 07 6 8.4 -9 677.60 -59.4 -57.5 -59.4 60 -99 SPO 1997 04 15 02 08 6 8.5 -9 677.60 -59.4 -57.5 -59.5 59 -99 SPO 1997 04 15 02 09 5 8.5 -9 677.70 -59.4 -57.4 -59.4 59 -99 SPO 1997 04 15 02 10 6 8.5 -9 677.70 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 02 11 6 8.5 -9 677.70 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 02 12 6 8.5 -9 677.70 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 02 13 5 8.5 -9 677.70 -59.4 -57.4 -59.5 58 -99 SPO 1997 04 15 02 14 5 8.6 -9 677.70 -59.4 -57.4 -59.6 58 -99 SPO 1997 04 15 02 15 5 8.6 -9 677.70 -59.5 -57.4 -59.6 58 -99 SPO 1997 04 15 02 16 5 8.5 -9 677.70 -59.5 -57.4 -59.6 59 -99 SPO 1997 04 15 02 17 5 8.5 -9 677.70 -59.5 -57.4 -59.6 59 -99 SPO 1997 04 15 02 18 5 8.4 -9 677.80 -59.5 -57.4 -59.6 59 -99 SPO 1997 04 15 02 19 5 8.5 -9 677.80 -59.5 -57.4 -59.6 59 -99 SPO 1997 04 15 02 20 5 8.5 -9 677.80 -59.5 -57.5 -59.6 59 -99 SPO 1997 04 15 02 21 6 8.6 -9 677.80 -59.5 -57.4 -59.6 58 -99 SPO 1997 04 15 02 22 7 8.5 -9 677.80 -59.5 -57.4 -59.7 58 -99 SPO 1997 04 15 02 23 6 8.6 -9 677.80 -59.6 -57.4 -59.7 58 -99 SPO 1997 04 15 02 24 6 8.7 -9 677.80 -59.6 -57.4 -59.7 58 -99 SPO 1997 04 15 02 25 6 8.6 -9 677.80 -59.6 -57.4 -59.7 59 -99 SPO 1997 04 15 02 26 6 8.6 -9 677.80 -59.6 -57.4 -59.7 59 -99 SPO 1997 04 15 02 27 6 8.6 -9 677.80 -59.6 -57.4 -59.7 60 -99 SPO 1997 04 15 02 28 6 8.7 -9 677.80 -59.6 -57.4 -59.7 60 -99 SPO 1997 04 15 02 29 6 8.6 -9 677.80 -59.6 -57.5 -59.7 60 -99 SPO 1997 04 15 02 30 7 8.6 -9 677.80 -59.6 -57.5 -59.7 60 -99 SPO 1997 04 15 02 31 6 8.7 -9 677.80 -59.6 -57.4 -59.7 59 -99 SPO 1997 04 15 02 32 7 8.6 -9 677.80 -59.6 -57.4 -59.7 57 -99 SPO 1997 04 15 02 33 8 8.7 -9 677.80 -59.6 -57.4 -59.7 57 -99 SPO 1997 04 15 02 34 7 8.5 -9 677.90 -59.6 -57.5 -59.7 57 -99 SPO 1997 04 15 02 35 7 8.5 -9 677.90 -59.6 -57.5 -59.6 57 -99 SPO 1997 04 15 02 36 7 8.5 -9 677.90 -59.6 -57.5 -59.6 57 -99 SPO 1997 04 15 02 37 7 8.6 -9 677.90 -59.6 -57.5 -59.6 58 -99 SPO 1997 04 15 02 38 6 8.5 -9 677.90 -59.6 -57.4 -59.6 59 -99 SPO 1997 04 15 02 39 7 8.7 -9 677.90 -59.6 -57.4 -59.6 59 -99 SPO 1997 04 15 02 40 7 8.6 -9 677.90 -59.5 -57.3 -59.5 59 -99 SPO 1997 04 15 02 41 7 8.6 -9 677.90 -59.5 -57.3 -59.5 59 -99 SPO 1997 04 15 02 42 8 8.4 -9 678.00 -59.4 -57.2 -59.5 58 -99 SPO 1997 04 15 02 43 7 8.5 -9 678.00 -59.4 -57.3 -59.5 58 -99 SPO 1997 04 15 02 44 7 8.6 -9 678.00 -59.4 -57.3 -59.4 58 -99 SPO 1997 04 15 02 45 7 8.5 -9 678.00 -59.4 -57.3 -59.4 58 -99 SPO 1997 04 15 02 46 7 8.5 -9 678.00 -59.4 -57.3 -59.4 58 -99 SPO 1997 04 15 02 47 6 8.4 -9 678.00 -59.3 -57.4 -59.3 58 -99 SPO 1997 04 15 02 48 6 8.5 -9 678.00 -59.3 -57.4 -59.3 58 -99 SPO 1997 04 15 02 49 6 8.3 -9 678.00 -59.2 -57.4 -59.3 58 -99 SPO 1997 04 15 02 50 5 8.3 -9 678.00 -59.2 -57.4 -59.2 59 -99 SPO 1997 04 15 02 51 5 8.4 -9 678.10 -59.2 -57.5 -59.2 60 -99 SPO 1997 04 15 02 52 5 8.3 -9 678.10 -59.2 -57.6 -59.2 60 -99 SPO 1997 04 15 02 53 6 8.4 -9 678.10 -59.1 -57.6 -59.2 60 -99 SPO 1997 04 15 02 54 5 8.3 -9 678.10 -59.2 -57.6 -59.2 61 -99 SPO 1997 04 15 02 55 5 8.3 -9 678.10 -59.2 -57.6 -59.2 60 -99 SPO 1997 04 15 02 56 5 8.5 -9 678.10 -59.1 -57.5 -59.2 59 -99 SPO 1997 04 15 02 57 5 8.5 -9 678.10 -59.1 -57.6 -59.2 58 -99 SPO 1997 04 15 02 58 5 8.6 -9 678.20 -59.1 -57.6 -59.2 58 -99 SPO 1997 04 15 02 59 5 8.5 -9 678.20 -59.1 -57.6 -59.2 59 -99 SPO 1997 04 15 03 00 4 8.5 -9 678.20 -59.1 -57.6 -59.2 60 0 SPO 1997 04 15 03 01 4 8.4 -9 678.20 -59.1 -57.6 -59.2 60 -99 SPO 1997 04 15 03 02 4 8.2 -9 678.20 -59.1 -57.6 -59.2 61 -99 SPO 1997 04 15 03 03 5 8.3 -9 678.20 -59.1 -57.6 -59.2 61 -99 SPO 1997 04 15 03 04 5 8.5 -9 678.20 -59.1 -57.4 -59.2 60 -99 SPO 1997 04 15 03 05 5 8.4 -9 678.20 -59.1 -57.4 -59.2 59 -99 SPO 1997 04 15 03 06 4 8.2 -9 678.20 -59.1 -57.5 -59.2 59 -99 SPO 1997 04 15 03 07 4 8.4 -9 678.20 -59.1 -57.5 -59.1 59 -99 SPO 1997 04 15 03 08 4 8.2 -9 678.20 -59.1 -57.5 -59.1 59 -99 SPO 1997 04 15 03 09 6 8.3 -9 678.20 -59.0 -57.5 -59.1 58 -99 SPO 1997 04 15 03 10 6 8.4 -9 678.20 -59.1 -57.5 -59.2 59 -99 SPO 1997 04 15 03 11 6 8.3 -9 678.20 -59.1 -57.4 -59.2 59 -99 SPO 1997 04 15 03 12 6 8.2 -9 678.30 -59.1 -57.5 -59.2 60 -99 SPO 1997 04 15 03 13 6 8.2 -9 678.30 -59.1 -57.5 -59.2 61 -99 SPO 1997 04 15 03 14 6 8.2 -9 678.30 -59.1 -57.6 -59.2 61 -99 SPO 1997 04 15 03 15 7 8.2 -9 678.30 -59.1 -57.6 -59.2 61 -99 SPO 1997 04 15 03 16 7 8.2 -9 678.30 -59.1 -57.6 -59.2 61 -99 SPO 1997 04 15 03 17 6 8.0 -9 678.30 -59.1 -57.7 -59.2 61 -99 SPO 1997 04 15 03 18 6 8.1 -9 678.30 -59.1 -57.8 -59.3 60 -99 SPO 1997 04 15 03 19 7 8.2 -9 678.30 -59.2 -57.8 -59.3 60 -99 SPO 1997 04 15 03 20 7 8.3 -9 678.30 -59.2 -57.9 -59.3 59 -99 SPO 1997 04 15 03 21 6 8.2 -9 678.30 -59.2 -58.0 -59.4 59 -99 SPO 1997 04 15 03 22 6 8.2 -9 678.30 -59.3 -58.0 -59.4 59 -99 SPO 1997 04 15 03 23 6 8.2 -9 678.30 -59.3 -58.0 -59.4 59 -99 SPO 1997 04 15 03 24 6 8.2 -9 678.30 -59.3 -58.1 -59.4 60 -99 SPO 1997 04 15 03 25 6 8.3 -9 678.30 -59.4 -58.0 -59.5 61 -99 SPO 1997 04 15 03 26 6 8.3 -9 678.30 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 03 27 6 8.4 -9 678.30 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 03 28 5 8.4 -9 678.30 -59.4 -58.1 -59.4 61 -99 SPO 1997 04 15 03 29 5 8.3 -9 678.30 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 03 30 5 8.3 -9 678.40 -59.4 -58.0 -59.4 60 -99 SPO 1997 04 15 03 31 6 8.4 -9 678.40 -59.4 -57.9 -59.4 60 -99 SPO 1997 04 15 03 32 5 8.3 -9 678.40 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 15 03 33 5 8.3 -9 678.40 -59.4 -57.8 -59.4 60 -99 SPO 1997 04 15 03 34 5 8.3 -9 678.40 -59.4 -57.8 -59.4 60 -99 SPO 1997 04 15 03 35 5 8.3 -9 678.40 -59.4 -57.8 -59.5 60 -99 SPO 1997 04 15 03 36 5 8.4 -9 678.40 -59.4 -57.8 -59.5 60 -99 SPO 1997 04 15 03 37 5 8.4 -9 678.40 -59.4 -57.9 -59.5 61 -99 SPO 1997 04 15 03 38 5 8.3 -9 678.40 -59.4 -58.0 -59.6 61 -99 SPO 1997 04 15 03 39 5 8.5 -9 678.40 -59.5 -57.9 -59.6 61 -99 SPO 1997 04 15 03 40 5 8.4 -9 678.50 -59.5 -58.0 -59.6 61 -99 SPO 1997 04 15 03 41 5 8.3 -9 678.50 -59.6 -57.9 -59.7 61 -99 SPO 1997 04 15 03 42 6 8.3 -9 678.50 -59.6 -58.0 -59.7 60 -99 SPO 1997 04 15 03 43 6 8.3 -9 678.50 -59.6 -57.9 -59.7 60 -99 SPO 1997 04 15 03 44 6 8.2 -9 678.50 -59.6 -57.8 -59.7 60 -99 SPO 1997 04 15 03 45 5 8.2 -9 678.50 -59.6 -57.8 -59.7 60 -99 SPO 1997 04 15 03 46 5 8.2 -9 678.50 -59.6 -57.8 -59.6 60 -99 SPO 1997 04 15 03 47 5 8.2 -9 678.50 -59.6 -57.8 -59.6 60 -99 SPO 1997 04 15 03 48 5 8.1 -9 678.50 -59.5 -57.8 -59.6 60 -99 SPO 1997 04 15 03 49 6 8.2 -9 678.50 -59.5 -57.8 -59.6 61 -99 SPO 1997 04 15 03 50 5 8.2 -9 678.50 -59.5 -57.8 -59.6 60 -99 SPO 1997 04 15 03 51 5 8.3 -9 678.50 -59.5 -57.8 -59.5 60 -99 SPO 1997 04 15 03 52 5 8.2 -9 678.50 -59.5 -57.9 -59.5 59 -99 SPO 1997 04 15 03 53 6 8.5 -9 678.50 -59.5 -57.9 -59.5 59 -99 SPO 1997 04 15 03 54 5 8.1 -9 678.60 -59.5 -57.9 -59.5 59 -99 SPO 1997 04 15 03 55 5 8.2 -9 678.60 -59.4 -58.0 -59.5 58 -99 SPO 1997 04 15 03 56 5 8.3 -9 678.60 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 03 57 5 8.2 -9 678.60 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 03 58 5 8.2 -9 678.60 -59.4 -57.9 -59.5 59 -99 SPO 1997 04 15 03 59 6 8.3 -9 678.60 -59.4 -57.9 -59.5 59 -99 SPO 1997 04 15 04 00 6 8.1 -9 678.60 -59.4 -57.9 -59.5 60 0 SPO 1997 04 15 04 01 6 8.2 -9 678.60 -59.4 -57.9 -59.5 61 -99 SPO 1997 04 15 04 02 6 8.1 -9 678.70 -59.4 -57.9 -59.4 61 -99 SPO 1997 04 15 04 03 7 8.0 -9 678.70 -59.4 -57.9 -59.4 60 -99 SPO 1997 04 15 04 04 7 8.0 -9 678.70 -59.4 -57.8 -59.5 60 -99 SPO 1997 04 15 04 05 7 8.1 -9 678.70 -59.4 -57.9 -59.5 59 -99 SPO 1997 04 15 04 06 7 8.0 -9 678.70 -59.4 -57.9 -59.4 59 -99 SPO 1997 04 15 04 07 7 8.1 -9 678.80 -59.4 -57.9 -59.5 58 -99 SPO 1997 04 15 04 08 6 8.1 -9 678.80 -59.4 -58.0 -59.4 59 -99 SPO 1997 04 15 04 09 7 8.1 -9 678.80 -59.4 -58.0 -59.4 59 -99 SPO 1997 04 15 04 10 7 8.2 -9 678.80 -59.4 -58.0 -59.4 60 -99 SPO 1997 04 15 04 11 8 8.1 -9 678.80 -59.4 -58.0 -59.4 60 -99 SPO 1997 04 15 04 12 8 8.0 -9 678.80 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 04 13 7 8.1 -9 678.80 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 04 14 7 8.0 -9 678.80 -59.4 -58.0 -59.4 61 -99 SPO 1997 04 15 04 15 7 8.2 -9 678.80 -59.3 -58.0 -59.4 60 -99 SPO 1997 04 15 04 16 7 8.2 -9 678.80 -59.3 -57.9 -59.4 59 -99 SPO 1997 04 15 04 17 7 8.1 -9 678.80 -59.3 -57.9 -59.4 59 -99 SPO 1997 04 15 04 18 7 8.1 -9 678.80 -59.3 -57.9 -59.3 59 -99 SPO 1997 04 15 04 19 6 8.0 -9 678.80 -59.3 -57.9 -59.4 60 -99 SPO 1997 04 15 04 20 6 8.2 -9 678.90 -59.3 -57.8 -59.3 60 -99 SPO 1997 04 15 04 21 6 8.2 -9 678.90 -59.2 -57.7 -59.3 59 -99 SPO 1997 04 15 04 22 6 8.2 -9 678.90 -59.2 -57.7 -59.2 59 -99 SPO 1997 04 15 04 23 5 8.3 -9 678.90 -59.2 -57.7 -59.2 59 -99 SPO 1997 04 15 04 24 6 8.3 -9 678.90 -59.2 -57.8 -59.2 60 -99 SPO 1997 04 15 04 25 6 8.5 -9 678.90 -59.1 -57.8 -59.2 59 -99 SPO 1997 04 15 04 26 6 8.3 -9 678.90 -59.1 -57.8 -59.1 59 -99 SPO 1997 04 15 04 27 7 8.3 -9 678.90 -59.1 -57.8 -59.1 59 -99 SPO 1997 04 15 04 28 6 8.1 -9 678.90 -59.0 -57.9 -59.1 58 -99 SPO 1997 04 15 04 29 6 8.2 -9 678.90 -59.0 -57.9 -59.1 58 -99 SPO 1997 04 15 04 30 7 8.2 -9 678.90 -59.0 -57.9 -59.1 58 -99 SPO 1997 04 15 04 31 7 8.1 -9 679.00 -59.0 -57.9 -59.1 59 -99 SPO 1997 04 15 04 32 6 8.2 -9 679.00 -59.0 -57.8 -59.1 59 -99 SPO 1997 04 15 04 33 6 8.1 -9 679.00 -59.0 -57.8 -59.1 60 -99 SPO 1997 04 15 04 34 6 8.1 -9 679.00 -59.0 -57.8 -59.1 59 -99 SPO 1997 04 15 04 35 7 8.0 -9 679.00 -59.0 -57.7 -59.1 60 -99 SPO 1997 04 15 04 36 7 8.2 -9 679.00 -59.0 -57.8 -59.1 59 -99 SPO 1997 04 15 04 37 6 8.1 -9 679.00 -59.0 -57.8 -59.0 58 -99 SPO 1997 04 15 04 38 6 8.1 -9 679.00 -58.9 -57.9 -59.0 58 -99 SPO 1997 04 15 04 39 6 8.0 -9 679.00 -59.0 -58.0 -59.0 59 -99 SPO 1997 04 15 04 40 5 8.2 -9 679.00 -59.0 -58.1 -59.0 59 -99 SPO 1997 04 15 04 41 5 8.3 -9 679.00 -59.0 -58.2 -59.0 59 -99 SPO 1997 04 15 04 42 5 8.2 -9 679.00 -59.0 -58.2 -59.0 60 -99 SPO 1997 04 15 04 43 5 8.2 -9 679.00 -59.0 -58.3 -59.1 60 -99 SPO 1997 04 15 04 44 6 8.3 -9 679.00 -59.0 -58.2 -59.1 60 -99 SPO 1997 04 15 04 45 5 8.2 -9 679.00 -59.0 -58.2 -59.1 60 -99 SPO 1997 04 15 04 46 6 8.3 -9 679.00 -59.0 -58.2 -59.2 61 -99 SPO 1997 04 15 04 47 6 8.1 -9 679.00 -59.1 -58.2 -59.2 61 -99 SPO 1997 04 15 04 48 7 8.1 -9 679.10 -59.1 -58.2 -59.2 61 -99 SPO 1997 04 15 04 49 6 8.2 -9 679.10 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 15 04 50 7 7.9 -9 679.10 -59.1 -58.3 -59.2 60 -99 SPO 1997 04 15 04 51 7 8.2 -9 679.10 -59.1 -58.2 -59.2 59 -99 SPO 1997 04 15 04 52 7 8.2 -9 679.10 -59.1 -58.2 -59.2 58 -99 SPO 1997 04 15 04 53 7 8.0 -9 679.20 -59.2 -58.3 -59.3 59 -99 SPO 1997 04 15 04 54 8 8.1 -9 679.20 -59.2 -58.2 -59.3 60 -99 SPO 1997 04 15 04 55 8 8.0 -9 679.20 -59.2 -58.2 -59.3 60 -99 SPO 1997 04 15 04 56 8 8.1 -9 679.20 -59.2 -58.2 -59.4 60 -99 SPO 1997 04 15 04 57 8 8.2 -9 679.20 -59.3 -58.3 -59.4 61 -99 SPO 1997 04 15 04 58 8 8.0 -9 679.20 -59.3 -58.3 -59.4 61 -99 SPO 1997 04 15 04 59 8 7.9 -9 679.20 -59.4 -58.2 -59.4 61 -99 SPO 1997 04 15 05 00 8 7.8 -9 679.20 -59.4 -58.2 -59.4 61 0 SPO 1997 04 15 05 01 7 8.0 -9 679.20 -59.4 -58.2 -59.4 60 -99 SPO 1997 04 15 05 02 7 7.9 -9 679.20 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 15 05 03 7 8.1 -9 679.20 -59.4 -58.3 -59.5 59 -99 SPO 1997 04 15 05 04 7 8.1 -9 679.20 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 05 6 8.0 -9 679.20 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 06 6 8.2 -9 679.20 -59.4 -58.1 -59.5 60 -99 SPO 1997 04 15 05 07 7 8.2 -9 679.20 -59.4 -58.1 -59.5 60 -99 SPO 1997 04 15 05 08 6 8.3 -9 679.30 -59.4 -58.1 -59.5 59 -99 SPO 1997 04 15 05 09 6 8.1 -9 679.30 -59.4 -58.1 -59.4 59 -99 SPO 1997 04 15 05 10 6 8.0 -9 679.30 -59.4 -58.1 -59.4 59 -99 SPO 1997 04 15 05 11 6 8.2 -9 679.30 -59.4 -58.2 -59.4 59 -99 SPO 1997 04 15 05 12 7 8.1 -9 679.30 -59.4 -58.2 -59.4 59 -99 SPO 1997 04 15 05 13 7 8.1 -9 679.30 -59.4 -58.2 -59.4 59 -99 SPO 1997 04 15 05 14 7 8.1 -9 679.30 -59.4 -58.1 -59.4 58 -99 SPO 1997 04 15 05 15 7 8.1 -9 679.30 -59.4 -58.2 -59.4 58 -99 SPO 1997 04 15 05 16 7 8.1 -9 679.30 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 17 8 7.9 -9 679.30 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 18 8 8.1 -9 679.40 -59.4 -58.2 -59.4 60 -99 SPO 1997 04 15 05 19 8 8.2 -9 679.40 -59.4 -58.2 -59.5 60 -99 SPO 1997 04 15 05 20 7 8.3 -9 679.40 -59.4 -58.1 -59.5 60 -99 SPO 1997 04 15 05 21 7 8.3 -9 679.40 -59.4 -58.0 -59.5 60 -99 SPO 1997 04 15 05 22 7 8.1 -9 679.40 -59.4 -58.0 -59.5 59 -99 SPO 1997 04 15 05 23 7 8.2 -9 679.40 -59.4 -58.0 -59.6 58 -99 SPO 1997 04 15 05 24 6 8.3 -9 679.40 -59.5 -58.0 -59.6 58 -99 SPO 1997 04 15 05 25 6 8.4 -9 679.40 -59.5 -58.0 -59.6 58 -99 SPO 1997 04 15 05 26 5 8.4 -9 679.40 -59.5 -58.1 -59.7 57 -99 SPO 1997 04 15 05 27 5 8.4 -9 679.40 -59.6 -58.1 -59.6 59 -99 SPO 1997 04 15 05 28 6 8.6 -9 679.40 -59.6 -58.1 -59.7 59 -99 SPO 1997 04 15 05 29 6 8.5 -9 679.40 -59.6 -58.2 -59.6 59 -99 SPO 1997 04 15 05 30 6 8.5 -9 679.40 -59.6 -58.2 -59.7 59 -99 SPO 1997 04 15 05 31 6 8.5 -9 679.40 -59.6 -58.2 -59.7 59 -99 SPO 1997 04 15 05 32 6 8.5 -9 679.40 -59.6 -58.1 -59.7 59 -99 SPO 1997 04 15 05 33 7 8.4 -9 679.50 -59.6 -58.1 -59.7 59 -99 SPO 1997 04 15 05 34 6 8.4 -9 679.50 -59.6 -58.0 -59.7 58 -99 SPO 1997 04 15 05 35 5 8.4 -9 679.50 -59.6 -58.0 -59.7 58 -99 SPO 1997 04 15 05 36 5 8.4 -9 679.50 -59.6 -58.0 -59.6 58 -99 SPO 1997 04 15 05 37 5 8.5 -9 679.50 -59.6 -58.0 -59.6 58 -99 SPO 1997 04 15 05 38 5 8.5 -9 679.50 -59.5 -58.0 -59.5 57 -99 SPO 1997 04 15 05 39 5 8.6 -9 679.50 -59.5 -58.0 -59.5 57 -99 SPO 1997 04 15 05 40 4 8.6 -9 679.50 -59.5 -58.1 -59.5 58 -99 SPO 1997 04 15 05 41 5 8.5 -9 679.50 -59.5 -58.1 -59.6 60 -99 SPO 1997 04 15 05 42 3 8.8 -9 679.60 -59.5 -58.2 -59.5 60 -99 SPO 1997 04 15 05 43 4 8.7 -9 679.60 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 44 5 8.8 -9 679.60 -59.5 -58.1 -59.5 61 -99 SPO 1997 04 15 05 45 5 8.7 -9 679.60 -59.4 -58.2 -59.5 59 -99 SPO 1997 04 15 05 46 5 8.7 -9 679.60 -59.4 -58.2 -59.6 59 -99 SPO 1997 04 15 05 47 5 8.7 -9 679.60 -59.4 -58.3 -59.6 59 -99 SPO 1997 04 15 05 48 5 8.8 -9 679.60 -59.4 -58.4 -59.5 59 -99 SPO 1997 04 15 05 49 5 8.7 -9 679.60 -59.4 -58.4 -59.6 59 -99 SPO 1997 04 15 05 50 5 8.8 -9 679.60 -59.4 -58.5 -59.6 59 -99 SPO 1997 04 15 05 51 5 8.8 -9 679.60 -59.5 -58.5 -59.6 60 -99 SPO 1997 04 15 05 52 5 8.8 -9 679.60 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 05 53 5 8.7 -9 679.60 -59.5 -58.6 -59.6 60 -99 SPO 1997 04 15 05 54 5 8.8 -9 679.60 -59.5 -58.6 -59.7 59 -99 SPO 1997 04 15 05 55 4 8.8 -9 679.60 -59.5 -58.7 -59.7 59 -99 SPO 1997 04 15 05 56 4 8.9 -9 679.60 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 05 57 4 8.9 -9 679.60 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 15 05 58 4 8.9 -9 679.60 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 05 59 3 9.0 -9 679.60 -59.6 -58.6 -59.7 60 -99 SPO 1997 04 15 06 00 4 8.9 -9 679.60 -59.6 -58.6 -59.7 60 0 SPO 1997 04 15 06 01 4 8.6 -9 679.60 -59.6 -58.6 -59.7 60 -99 SPO 1997 04 15 06 02 4 8.8 -9 679.60 -59.6 -58.5 -59.7 60 -99 SPO 1997 04 15 06 03 5 8.8 -9 679.70 -59.6 -58.5 -59.7 60 -99 SPO 1997 04 15 06 04 5 8.7 -9 679.70 -59.6 -58.5 -59.7 60 -99 SPO 1997 04 15 06 05 5 8.7 -9 679.70 -59.6 -58.5 -59.7 61 -99 SPO 1997 04 15 06 06 5 8.5 -9 679.70 -59.6 -58.6 -59.7 61 -99 SPO 1997 04 15 06 07 5 8.4 -9 679.70 -59.6 -58.6 -59.7 60 -99 SPO 1997 04 15 06 08 6 8.2 -9 679.70 -59.6 -58.6 -59.7 60 -99 SPO 1997 04 15 06 09 6 8.4 -9 679.80 -59.6 -58.6 -59.7 59 -99 SPO 1997 04 15 06 10 6 8.4 -9 679.80 -59.6 -58.8 -59.7 58 -99 SPO 1997 04 15 06 11 5 8.2 -9 679.80 -59.7 -58.8 -59.8 59 -99 SPO 1997 04 15 06 12 5 8.2 -9 679.80 -59.7 -58.8 -59.8 59 -99 SPO 1997 04 15 06 13 6 8.2 -9 679.80 -59.7 -58.8 -59.8 59 -99 SPO 1997 04 15 06 14 6 8.1 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 15 7 8.3 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 16 6 8.3 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 17 6 8.4 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 18 6 8.2 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 19 5 8.4 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 20 5 8.4 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 21 5 8.4 -9 679.80 -59.7 -58.8 -59.8 60 -99 SPO 1997 04 15 06 22 5 8.5 -9 679.80 -59.7 -58.7 -59.8 60 -99 SPO 1997 04 15 06 23 5 8.5 -9 679.80 -59.7 -58.7 -59.7 59 -99 SPO 1997 04 15 06 24 6 8.5 -9 679.80 -59.7 -58.6 -59.7 59 -99 SPO 1997 04 15 06 25 6 8.6 -9 679.80 -59.6 -58.7 -59.7 58 -99 SPO 1997 04 15 06 26 5 8.4 -9 679.80 -59.6 -58.8 -59.7 58 -99 SPO 1997 04 15 06 27 6 8.4 -9 679.80 -59.6 -58.8 -59.7 59 -99 SPO 1997 04 15 06 28 6 8.3 -9 679.90 -59.6 -58.8 -59.7 59 -99 SPO 1997 04 15 06 29 6 8.3 -9 679.90 -59.6 -58.8 -59.7 60 -99 SPO 1997 04 15 06 30 6 8.3 -9 679.90 -59.6 -58.8 -59.7 60 -99 SPO 1997 04 15 06 31 6 8.5 -9 679.90 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 06 32 6 8.3 -9 679.90 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 15 06 33 6 8.5 -9 679.90 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 15 06 34 5 8.4 -9 679.90 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 15 06 35 6 8.4 -9 679.80 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 15 06 36 6 8.4 -9 679.80 -59.6 -58.6 -59.7 59 -99 SPO 1997 04 15 06 37 5 8.3 -9 679.90 -59.6 -58.6 -59.7 60 -99 SPO 1997 04 15 06 38 6 8.5 -9 679.90 -59.6 -58.5 -59.7 60 -99 SPO 1997 04 15 06 39 6 8.3 -9 679.90 -59.6 -58.5 -59.7 60 -99 SPO 1997 04 15 06 40 6 8.4 -9 679.90 -59.6 -58.5 -59.6 60 -99 SPO 1997 04 15 06 41 7 8.5 -9 679.90 -59.6 -58.6 -59.7 59 -99 SPO 1997 04 15 06 42 7 8.5 -9 679.90 -59.6 -58.6 -59.6 59 -99 SPO 1997 04 15 06 43 7 8.3 -9 680.00 -59.6 -58.6 -59.6 60 -99 SPO 1997 04 15 06 44 7 8.2 -9 680.00 -59.6 -58.7 -59.6 60 -99 SPO 1997 04 15 06 45 7 8.1 -9 680.00 -59.6 -58.7 -59.6 60 -99 SPO 1997 04 15 06 46 6 8.2 -9 680.00 -59.6 -58.7 -59.6 60 -99 SPO 1997 04 15 06 47 6 8.2 -9 680.00 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 06 48 6 7.9 -9 680.00 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 06 49 5 7.8 -9 680.00 -59.6 -58.7 -59.7 60 -99 SPO 1997 04 15 06 50 6 7.8 -9 680.10 -59.6 -58.7 -59.7 61 -99 SPO 1997 04 15 06 51 5 7.7 -9 680.10 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 06 52 5 7.9 -9 680.10 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 06 53 5 7.9 -9 680.10 -59.5 -58.5 -59.6 60 -99 SPO 1997 04 15 06 54 4 7.8 -9 680.10 -59.5 -58.5 -59.6 60 -99 SPO 1997 04 15 06 55 5 7.4 -9 680.20 -59.5 -58.6 -59.6 59 -99 SPO 1997 04 15 06 56 4 7.4 -9 680.20 -59.5 -58.7 -59.6 59 -99 SPO 1997 04 15 06 57 5 7.6 -9 680.20 -59.5 -58.7 -59.6 59 -99 SPO 1997 04 15 06 58 5 7.8 -9 680.20 -59.5 -58.7 -59.6 59 -99 SPO 1997 04 15 06 59 5 7.7 -9 680.20 -59.5 -58.6 -59.6 60 -99 SPO 1997 04 15 07 00 5 7.9 -9 680.20 -59.5 -58.6 -59.6 60 0 SPO 1997 04 15 07 01 5 7.7 -9 680.20 -59.5 -58.5 -59.6 60 -99 SPO 1997 04 15 07 02 5 8.0 -9 680.20 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 07 03 3 7.4 -9 680.20 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 07 04 4 7.5 -9 680.20 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 15 07 05 4 7.6 -9 680.20 -59.5 -58.6 -59.6 61 -99 SPO 1997 04 15 07 06 4 7.8 -9 680.20 -59.5 -58.6 -59.6 60 -99 SPO 1997 04 15 07 07 4 7.7 -9 680.20 -59.5 -58.5 -59.6 60 -99 SPO 1997 04 15 07 08 2 7.8 -9 680.20 -59.5 -58.5 -59.5 60 -99 SPO 1997 04 15 07 09 4 8.0 -9 680.20 -59.5 -58.4 -59.6 60 -99 SPO 1997 04 15 07 10 3 7.7 -9 680.30 -59.5 -58.4 -59.6 60 -99 SPO 1997 04 15 07 11 4 7.9 -9 680.30 -59.5 -58.4 -59.5 60 -99 SPO 1997 04 15 07 12 4 7.9 -9 680.30 -59.4 -58.4 -59.5 59 -99 SPO 1997 04 15 07 13 5 7.8 -9 680.30 -59.4 -58.4 -59.5 60 -99 SPO 1997 04 15 07 14 4 7.9 -9 680.30 -59.4 -58.4 -59.5 61 -99 SPO 1997 04 15 07 15 4 7.8 -9 680.30 -59.4 -58.4 -59.5 61 -99 SPO 1997 04 15 07 16 5 7.9 -9 680.30 -59.4 -58.4 -59.5 61 -99 SPO 1997 04 15 07 17 5 8.1 -9 680.30 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 15 07 18 5 8.0 -9 680.30 -59.4 -58.2 -59.5 60 -99 SPO 1997 04 15 07 19 5 7.9 -9 680.30 -59.4 -58.2 -59.5 60 -99 SPO 1997 04 15 07 20 5 8.0 -9 680.30 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 15 07 21 6 8.0 -9 680.30 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 15 07 22 6 7.9 -9 680.30 -59.4 -58.3 -59.4 61 -99 SPO 1997 04 15 07 23 6 7.7 -9 680.30 -59.4 -58.3 -59.4 61 -99 SPO 1997 04 15 07 24 6 8.0 -9 680.30 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 25 6 7.8 -9 680.40 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 26 6 7.8 -9 680.40 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 27 6 7.8 -9 680.40 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 28 6 7.8 -9 680.40 -59.3 -58.2 -59.3 61 -99 SPO 1997 04 15 07 29 6 7.8 -9 680.40 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 30 7 7.6 -9 680.40 -59.3 -58.2 -59.3 61 -99 SPO 1997 04 15 07 31 6 7.6 -9 680.50 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 32 6 7.5 -9 680.50 -59.3 -58.2 -59.4 60 -99 SPO 1997 04 15 07 33 7 7.5 -9 680.50 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 34 7 7.4 -9 680.50 -59.3 -58.2 -59.4 61 -99 SPO 1997 04 15 07 35 8 7.6 -9 680.50 -59.3 -58.3 -59.3 61 -99 SPO 1997 04 15 07 36 7 7.7 -9 680.50 -59.3 -58.2 -59.3 61 -99 SPO 1997 04 15 07 37 8 7.7 -9 680.50 -59.2 -58.2 -59.3 61 -99 SPO 1997 04 15 07 38 8 7.5 -9 680.50 -59.2 -58.2 -59.3 61 -99 SPO 1997 04 15 07 39 8 7.4 -9 680.60 -59.2 -58.2 -59.3 61 -99 SPO 1997 04 15 07 40 8 7.5 -9 680.60 -59.2 -58.2 -59.3 60 -99 SPO 1997 04 15 07 41 9 7.5 -9 680.60 -59.2 -58.2 -59.3 60 -99 SPO 1997 04 15 07 42 9 7.7 -9 680.60 -59.2 -58.1 -59.2 59 -99 SPO 1997 04 15 07 43 9 7.3 -9 680.60 -59.2 -58.2 -59.2 59 -99 SPO 1997 04 15 07 44 9 7.5 -9 680.60 -59.2 -58.2 -59.2 60 -99 SPO 1997 04 15 07 45 9 7.7 -9 680.60 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 15 07 46 9 7.6 -9 680.60 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 15 07 47 9 7.6 -9 680.70 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 15 07 48 8 7.8 -9 680.60 -59.1 -58.2 -59.2 61 -99 SPO 1997 04 15 07 49 8 7.6 -9 680.70 -59.1 -58.2 -59.1 61 -99 SPO 1997 04 15 07 50 7 7.4 -9 680.70 -59.1 -58.3 -59.1 61 -99 SPO 1997 04 15 07 51 7 7.4 -9 680.70 -59.1 -58.3 -59.1 61 -99 SPO 1997 04 15 07 52 8 7.6 -9 680.70 -59.0 -58.3 -59.1 59 -99 SPO 1997 04 15 07 53 8 7.5 -9 680.70 -59.0 -58.4 -59.1 59 -99 SPO 1997 04 15 07 54 8 7.6 -9 680.70 -59.0 -58.3 -59.1 59 -99 SPO 1997 04 15 07 55 8 7.5 -9 680.70 -59.0 -58.3 -59.1 59 -99 SPO 1997 04 15 07 56 8 7.7 -9 680.70 -59.0 -58.3 -59.1 59 -99 SPO 1997 04 15 07 57 8 7.9 -9 680.70 -59.0 -58.2 -59.1 59 -99 SPO 1997 04 15 07 58 8 8.0 -9 680.70 -59.0 -58.2 -59.1 59 -99 SPO 1997 04 15 07 59 8 7.9 -9 680.80 -59.0 -58.2 -59.1 61 -99 SPO 1997 04 15 08 00 7 7.9 -9 680.80 -59.0 -58.2 -59.0 61 0 SPO 1997 04 15 08 01 7 8.0 -9 680.80 -59.0 -58.2 -59.0 61 -99 SPO 1997 04 15 08 02 7 8.0 -9 680.80 -59.0 -58.1 -59.0 61 -99 SPO 1997 04 15 08 03 7 8.0 -9 680.90 -59.0 -58.0 -59.0 61 -99 SPO 1997 04 15 08 04 7 8.1 -9 680.90 -58.9 -58.0 -59.0 61 -99 SPO 1997 04 15 08 05 7 7.8 -9 680.90 -58.9 -58.0 -59.0 61 -99 SPO 1997 04 15 08 06 8 7.8 -9 680.90 -58.9 -58.0 -58.9 60 -99 SPO 1997 04 15 08 07 8 7.9 -9 680.90 -58.9 -58.0 -58.9 60 -99 SPO 1997 04 15 08 08 8 8.1 -9 680.90 -58.8 -58.0 -58.9 60 -99 SPO 1997 04 15 08 09 9 8.1 -9 680.90 -58.8 -58.0 -58.9 61 -99 SPO 1997 04 15 08 10 9 8.1 -9 680.90 -58.8 -57.9 -58.9 61 -99 SPO 1997 04 15 08 11 8 8.1 -9 680.90 -58.8 -57.9 -58.8 61 -99 SPO 1997 04 15 08 12 9 8.0 -9 680.90 -58.8 -57.8 -58.8 61 -99 SPO 1997 04 15 08 13 9 8.0 -9 680.90 -58.8 -57.8 -58.8 61 -99 SPO 1997 04 15 08 14 8 8.0 -9 680.90 -58.7 -57.8 -58.8 60 -99 SPO 1997 04 15 08 15 8 7.9 -9 680.90 -58.8 -57.8 -58.8 61 -99 SPO 1997 04 15 08 16 8 7.7 -9 681.00 -58.7 -57.8 -58.8 60 -99 SPO 1997 04 15 08 17 7 7.3 -9 681.00 -58.7 -57.8 -58.8 60 -99 SPO 1997 04 15 08 18 8 7.7 -9 681.00 -58.7 -57.8 -58.8 60 -99 SPO 1997 04 15 08 19 8 7.8 -9 681.00 -58.7 -57.8 -58.7 61 -99 SPO 1997 04 15 08 20 9 7.9 -9 681.00 -58.7 -57.7 -58.7 61 -99 SPO 1997 04 15 08 21 10 7.9 -9 681.00 -58.6 -57.6 -58.7 61 -99 SPO 1997 04 15 08 22 9 7.9 -9 681.00 -58.6 -57.6 -58.7 62 -99 SPO 1997 04 15 08 23 10 7.8 -9 681.00 -58.6 -57.6 -58.7 62 -99 SPO 1997 04 15 08 24 10 7.5 -9 681.00 -58.6 -57.6 -58.7 62 -99 SPO 1997 04 15 08 25 10 7.8 -9 681.00 -58.6 -57.6 -58.7 61 -99 SPO 1997 04 15 08 26 9 7.7 -9 681.10 -58.6 -57.7 -58.7 61 -99 SPO 1997 04 15 08 27 10 7.9 -9 681.10 -58.6 -57.6 -58.7 61 -99 SPO 1997 04 15 08 28 9 7.7 -9 681.10 -58.6 -57.6 -58.6 61 -99 SPO 1997 04 15 08 29 10 7.7 -9 681.10 -58.5 -57.6 -58.6 60 -99 SPO 1997 04 15 08 30 10 7.8 -9 681.10 -58.6 -57.7 -58.6 61 -99 SPO 1997 04 15 08 31 10 8.1 -9 681.10 -58.6 -57.8 -58.6 62 -99 SPO 1997 04 15 08 32 9 7.7 -9 681.10 -58.6 -57.8 -58.6 62 -99 SPO 1997 04 15 08 33 9 7.7 -9 681.10 -58.5 -57.8 -58.6 62 -99 SPO 1997 04 15 08 34 10 8.0 -9 681.10 -58.5 -57.8 -58.6 62 -99 SPO 1997 04 15 08 35 10 7.8 -9 681.10 -58.5 -57.6 -58.5 62 -99 SPO 1997 04 15 08 36 10 7.8 -9 681.10 -58.5 -57.6 -58.5 62 -99 SPO 1997 04 15 08 37 10 7.7 -9 681.10 -58.4 -57.6 -58.5 62 -99 SPO 1997 04 15 08 38 10 7.7 -9 681.10 -58.4 -57.5 -58.5 61 -99 SPO 1997 04 15 08 39 10 7.8 -9 681.10 -58.4 -57.5 -58.4 61 -99 SPO 1997 04 15 08 40 9 7.8 -9 681.10 -58.4 -57.5 -58.4 61 -99 SPO 1997 04 15 08 41 10 7.7 -9 681.10 -58.3 -57.5 -58.4 60 -99 SPO 1997 04 15 08 42 9 7.6 -9 681.10 -58.3 -57.5 -58.4 61 -99 SPO 1997 04 15 08 43 9 7.8 -9 681.10 -58.3 -57.5 -58.3 62 -99 SPO 1997 04 15 08 44 9 7.7 -9 681.10 -58.2 -57.5 -58.3 61 -99 SPO 1997 04 15 08 45 10 7.6 -9 681.10 -58.2 -57.5 -58.4 62 -99 SPO 1997 04 15 08 46 9 7.5 -9 681.10 -58.3 -57.6 -58.4 62 -99 SPO 1997 04 15 08 47 9 7.6 -9 681.10 -58.3 -57.7 -58.4 62 -99 SPO 1997 04 15 08 48 9 7.6 -9 681.10 -58.3 -57.6 -58.4 62 -99 SPO 1997 04 15 08 49 8 7.5 -9 681.20 -58.3 -57.6 -58.3 62 -99 SPO 1997 04 15 08 50 8 7.6 -9 681.20 -58.3 -57.6 -58.3 62 -99 SPO 1997 04 15 08 51 8 7.5 -9 681.20 -58.3 -57.6 -58.3 61 -99 SPO 1997 04 15 08 52 9 7.8 -9 681.20 -58.3 -57.5 -58.4 60 -99 SPO 1997 04 15 08 53 10 8.0 -9 681.20 -58.2 -57.5 -58.3 60 -99 SPO 1997 04 15 08 54 10 7.9 -9 681.20 -58.2 -57.4 -58.3 61 -99 SPO 1997 04 15 08 55 9 7.7 -9 681.20 -58.2 -57.4 -58.3 61 -99 SPO 1997 04 15 08 56 10 7.8 -9 681.20 -58.2 -57.4 -58.3 62 -99 SPO 1997 04 15 08 57 10 7.8 -9 681.20 -58.2 -57.4 -58.3 62 -99 SPO 1997 04 15 08 58 10 8.1 -9 681.20 -58.2 -57.4 -58.3 62 -99 SPO 1997 04 15 08 59 10 8.0 -9 681.20 -58.2 -57.3 -58.3 61 -99 SPO 1997 04 15 09 00 10 8.0 -9 681.20 -58.2 -57.2 -58.3 60 0 SPO 1997 04 15 09 01 10 8.1 -9 681.20 -58.2 -57.2 -58.3 60 -99 SPO 1997 04 15 09 02 10 8.2 -9 681.20 -58.2 -57.2 -58.3 60 -99 SPO 1997 04 15 09 03 10 8.1 -9 681.20 -58.2 -57.3 -58.3 60 -99 SPO 1997 04 15 09 04 10 8.3 -9 681.20 -58.2 -57.2 -58.3 60 -99 SPO 1997 04 15 09 05 11 8.2 -9 681.20 -58.2 -57.1 -58.2 61 -99 SPO 1997 04 15 09 06 11 8.4 -9 681.20 -58.2 -57.1 -58.2 61 -99 SPO 1997 04 15 09 07 10 8.3 -9 681.20 -58.2 -57.0 -58.2 62 -99 SPO 1997 04 15 09 08 9 8.2 -9 681.20 -58.2 -57.0 -58.2 62 -99 SPO 1997 04 15 09 09 8 7.9 -9 681.30 -58.1 -57.0 -58.2 61 -99 SPO 1997 04 15 09 10 9 8.1 -9 681.30 -58.1 -57.0 -58.2 61 -99 SPO 1997 04 15 09 11 9 8.0 -9 681.30 -58.1 -56.9 -58.2 61 -99 SPO 1997 04 15 09 12 10 8.0 -9 681.30 -58.1 -56.8 -58.1 60 -99 SPO 1997 04 15 09 13 9 7.9 -9 681.30 -58.1 -56.8 -58.1 61 -99 SPO 1997 04 15 09 14 9 8.1 -9 681.30 -58.0 -56.8 -58.1 60 -99 SPO 1997 04 15 09 15 9 7.8 -9 681.40 -58.0 -56.9 -58.0 60 -99 SPO 1997 04 15 09 16 9 7.9 -9 681.30 -58.0 -57.0 -58.0 60 -99 SPO 1997 04 15 09 17 10 7.8 -9 681.40 -58.0 -57.0 -58.0 61 -99 SPO 1997 04 15 09 18 9 7.9 -9 681.40 -57.9 -57.1 -58.0 61 -99 SPO 1997 04 15 09 19 8 8.0 -9 681.40 -57.9 -57.1 -58.0 62 -99 SPO 1997 04 15 09 20 9 8.2 -9 681.40 -57.9 -57.1 -58.0 62 -99 SPO 1997 04 15 09 21 8 8.2 -9 681.40 -57.9 -57.1 -58.0 62 -99 SPO 1997 04 15 09 22 8 8.3 -9 681.40 -57.9 -57.2 -58.0 62 -99 SPO 1997 04 15 09 23 7 8.2 -9 681.40 -57.9 -57.2 -58.0 61 -99 SPO 1997 04 15 09 24 6 7.6 -9 681.40 -57.9 -57.3 -58.0 60 -99 SPO 1997 04 15 09 25 8 7.7 -9 681.40 -57.9 -57.3 -58.1 60 -99 SPO 1997 04 15 09 26 8 7.9 -9 681.50 -57.9 -57.3 -58.0 60 -99 SPO 1997 04 15 09 27 8 8.0 -9 681.50 -57.9 -57.3 -58.0 60 -99 SPO 1997 04 15 09 28 9 7.9 -9 681.50 -57.9 -57.2 -58.0 60 -99 SPO 1997 04 15 09 29 9 8.0 -9 681.40 -57.9 -57.2 -58.0 60 -99 SPO 1997 04 15 09 30 9 8.1 -9 681.40 -57.9 -57.2 -58.0 61 -99 SPO 1997 04 15 09 31 9 7.8 -9 681.50 -57.9 -57.2 -58.0 61 -99 SPO 1997 04 15 09 32 10 7.9 -9 681.50 -57.9 -57.2 -58.0 61 -99 SPO 1997 04 15 09 33 9 7.7 -9 681.50 -57.9 -57.3 -57.9 61 -99 SPO 1997 04 15 09 34 9 7.5 -9 681.50 -57.9 -57.4 -57.9 61 -99 SPO 1997 04 15 09 35 10 7.6 -9 681.50 -57.9 -57.4 -57.9 60 -99 SPO 1997 04 15 09 36 10 7.8 -9 681.50 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 15 09 37 10 7.8 -9 681.50 -57.9 -57.4 -58.0 60 -99 SPO 1997 04 15 09 38 10 7.9 -9 681.50 -57.9 -57.3 -58.0 59 -99 SPO 1997 04 15 09 39 11 8.2 -9 681.50 -57.9 -57.3 -58.0 60 -99 SPO 1997 04 15 09 40 11 8.3 -9 681.50 -57.9 -57.2 -58.0 60 -99 SPO 1997 04 15 09 41 11 8.4 -9 681.50 -57.9 -57.2 -58.0 61 -99 SPO 1997 04 15 09 42 12 8.0 -9 681.50 -57.9 -57.1 -58.0 61 -99 SPO 1997 04 15 09 43 11 7.8 -9 681.50 -57.9 -57.3 -58.0 61 -99 SPO 1997 04 15 09 44 12 7.8 -9 681.50 -57.9 -57.3 -58.0 61 -99 SPO 1997 04 15 09 45 15 7.8 -9 681.50 -58.0 -57.3 -58.1 62 -99 SPO 1997 04 15 09 46 12 7.2 -9 681.60 -58.0 -57.4 -58.1 61 -99 SPO 1997 04 15 09 47 12 7.5 -9 681.60 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 15 09 48 12 7.7 -9 681.60 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 15 09 49 13 7.9 -9 681.50 -58.0 -57.3 -58.1 60 -99 SPO 1997 04 15 09 50 12 7.6 -9 681.50 -58.0 -57.3 -58.1 60 -99 SPO 1997 04 15 09 51 12 7.6 -9 681.50 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 15 09 52 12 7.9 -9 681.50 -58.0 -57.4 -58.1 60 -99 SPO 1997 04 15 09 53 11 7.8 -9 681.50 -58.1 -57.4 -58.1 61 -99 SPO 1997 04 15 09 54 10 8.0 -9 681.50 -58.1 -57.4 -58.2 61 -99 SPO 1997 04 15 09 55 11 8.1 -9 681.50 -58.1 -57.4 -58.1 61 -99 SPO 1997 04 15 09 56 11 8.1 -9 681.50 -58.0 -57.3 -58.1 59 -99 SPO 1997 04 15 09 57 10 8.1 -9 681.50 -58.0 -57.3 -58.1 59 -99 SPO 1997 04 15 09 58 10 8.4 -9 681.50 -58.0 -57.2 -58.1 59 -99 SPO 1997 04 15 09 59 10 8.3 -9 681.50 -58.0 -57.2 -58.0 59 -99 SPO 1997 04 15 10 00 11 8.5 -9 681.50 -58.0 -57.2 -58.0 59 0 SPO 1997 04 15 10 01 11 8.5 -9 681.50 -58.0 -57.1 -58.0 59 -99 SPO 1997 04 15 10 02 10 8.5 -9 681.40 -57.9 -57.0 -58.0 59 -99 SPO 1997 04 15 10 03 10 8.4 -9 681.40 -57.9 -57.0 -57.9 60 -99 SPO 1997 04 15 10 04 9 8.4 -9 681.40 -57.9 -57.0 -57.9 60 -99 SPO 1997 04 15 10 05 9 8.3 -9 681.50 -57.9 -57.1 -57.9 61 -99 SPO 1997 04 15 10 06 8 8.2 -9 681.50 -57.8 -57.1 -57.9 60 -99 SPO 1997 04 15 10 07 8 8.5 -9 681.50 -57.8 -57.1 -57.8 60 -99 SPO 1997 04 15 10 08 9 8.2 -9 681.50 -57.8 -57.1 -57.8 60 -99 SPO 1997 04 15 10 09 9 8.2 -9 681.50 -57.8 -57.1 -57.8 60 -99 SPO 1997 04 15 10 10 10 8.2 -9 681.50 -57.7 -57.0 -57.8 59 -99 SPO 1997 04 15 10 11 10 8.2 -9 681.50 -57.7 -57.0 -57.7 59 -99 SPO 1997 04 15 10 12 11 8.0 -9 681.50 -57.7 -56.8 -57.7 59 -99 SPO 1997 04 15 10 13 11 8.1 -9 681.50 -57.6 -56.8 -57.7 59 -99 SPO 1997 04 15 10 14 11 8.1 -9 681.50 -57.6 -56.8 -57.6 60 -99 SPO 1997 04 15 10 15 11 8.0 -9 681.50 -57.6 -56.8 -57.6 62 -99 SPO 1997 04 15 10 16 11 8.1 -9 681.50 -57.5 -56.7 -57.6 62 -99 SPO 1997 04 15 10 17 10 8.2 -9 681.50 -57.5 -56.6 -57.5 62 -99 SPO 1997 04 15 10 18 10 8.1 -9 681.60 -57.4 -56.7 -57.5 61 -99 SPO 1997 04 15 10 19 10 7.9 -9 681.60 -57.4 -56.7 -57.5 61 -99 SPO 1997 04 15 10 20 10 8.0 -9 681.60 -57.4 -56.8 -57.5 61 -99 SPO 1997 04 15 10 21 9 8.1 -9 681.60 -57.4 -56.9 -57.5 61 -99 SPO 1997 04 15 10 22 8 7.5 -9 681.60 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 23 8 7.7 -9 681.60 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 24 8 8.0 -9 681.70 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 25 8 7.7 -9 681.70 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 26 8 7.7 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 27 8 7.6 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 28 8 7.6 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 29 9 7.5 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 30 9 7.7 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 31 10 7.9 -9 681.70 -57.4 -57.0 -57.5 62 -99 SPO 1997 04 15 10 32 9 7.8 -9 681.80 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 33 12 7.5 -9 681.80 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 10 34 10 7.4 -9 681.80 -57.4 -57.0 -57.5 60 -99 SPO 1997 04 15 10 35 11 7.6 -9 681.80 -57.4 -57.0 -57.4 60 -99 SPO 1997 04 15 10 36 11 7.5 -9 681.80 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 15 10 37 12 7.9 -9 681.80 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 15 10 38 11 7.5 -9 681.80 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 10 39 10 7.3 -9 681.80 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 10 40 11 7.4 -9 681.80 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 10 41 11 7.4 -9 681.80 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 10 42 11 7.6 -9 681.80 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 43 11 7.5 -9 681.80 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 44 11 7.3 -9 681.80 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 45 10 7.6 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 46 11 7.5 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 47 10 7.5 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 48 11 7.6 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 49 11 7.6 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 10 50 9 7.5 -9 681.90 -57.5 -57.3 -57.5 61 -99 SPO 1997 04 15 10 51 11 7.3 -9 681.90 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 15 10 52 10 7.4 -9 681.90 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 15 10 53 11 7.2 -9 681.90 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 15 10 54 11 7.6 -9 682.00 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 10 55 12 7.5 -9 681.90 -57.5 -57.3 -57.5 61 -99 SPO 1997 04 15 10 56 12 7.4 -9 681.90 -57.5 -57.4 -57.6 61 -99 SPO 1997 04 15 10 57 12 7.6 -9 681.90 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 10 58 12 7.3 -9 681.90 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 10 59 12 7.6 -9 681.90 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 11 00 13 7.4 -9 681.90 -57.5 -57.2 -57.5 62 0 SPO 1997 04 15 11 01 13 7.5 -9 681.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 11 02 13 7.5 -9 681.90 -57.4 -57.2 -57.6 61 -99 SPO 1997 04 15 11 03 12 7.5 -9 681.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 11 04 12 7.7 -9 681.90 -57.4 -57.1 -57.5 62 -99 SPO 1997 04 15 11 05 12 7.6 -9 682.00 -57.4 -57.1 -57.5 61 -99 SPO 1997 04 15 11 06 11 7.6 -9 681.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 11 07 11 7.7 -9 681.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 11 08 12 7.6 -9 681.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 11 09 12 7.4 -9 682.00 -57.4 -57.2 -57.5 62 -99 SPO 1997 04 15 11 10 12 7.6 -9 682.00 -57.4 -57.2 -57.5 62 -99 SPO 1997 04 15 11 11 12 7.6 -9 682.00 -57.3 -57.2 -57.5 62 -99 SPO 1997 04 15 11 12 11 7.5 -9 682.00 -57.4 -57.1 -57.4 63 -99 SPO 1997 04 15 11 13 11 7.5 -9 682.00 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 15 11 14 12 7.6 -9 682.00 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 15 11 15 12 7.4 -9 682.00 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 15 11 16 13 7.2 -9 682.00 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 15 11 17 12 7.2 -9 682.00 -57.3 -57.0 -57.4 61 -99 SPO 1997 04 15 11 18 12 7.5 -9 682.10 -57.3 -57.0 -57.4 61 -99 SPO 1997 04 15 11 19 13 7.7 -9 682.10 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 15 11 20 12 7.5 -9 682.10 -57.3 -57.0 -57.4 60 -99 SPO 1997 04 15 11 21 12 7.5 -9 682.10 -57.3 -56.9 -57.4 60 -99 SPO 1997 04 15 11 22 12 7.8 -9 682.10 -57.3 -56.9 -57.3 60 -99 SPO 1997 04 15 11 23 11 7.5 -9 682.10 -57.3 -57.0 -57.3 61 -99 SPO 1997 04 15 11 24 10 7.7 -9 682.10 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 15 11 25 9 7.7 -9 682.10 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 15 11 26 9 7.7 -9 682.10 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 15 11 27 9 7.6 -9 682.10 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 15 11 28 9 7.5 -9 682.10 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 15 11 29 8 7.7 -9 682.20 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 15 11 30 8 7.6 -9 682.20 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 31 8 7.7 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 32 8 7.7 -9 682.20 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 33 8 7.7 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 34 9 8.0 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 35 9 7.8 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 36 10 7.9 -9 682.30 -57.2 -56.9 -57.3 61 -99 SPO 1997 04 15 11 37 8 7.9 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 38 9 8.0 -9 682.30 -57.2 -56.9 -57.3 60 -99 SPO 1997 04 15 11 39 8 7.9 -9 682.30 -57.2 -57.0 -57.3 60 -99 SPO 1997 04 15 11 40 7 7.6 -9 682.30 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 11 41 7 7.8 -9 682.30 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 11 42 8 8.0 -9 682.30 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 11 43 7 7.9 -9 682.40 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 15 11 44 7 7.7 -9 682.40 -57.2 -57.1 -57.4 61 -99 SPO 1997 04 15 11 45 7 7.7 -9 682.40 -57.2 -57.2 -57.4 62 -99 SPO 1997 04 15 11 46 7 7.4 -9 682.40 -57.2 -57.1 -57.4 62 -99 SPO 1997 04 15 11 47 7 7.7 -9 682.50 -57.2 -57.1 -57.4 62 -99 SPO 1997 04 15 11 48 7 7.7 -9 682.40 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 15 11 49 7 8.1 -9 682.50 -57.2 -57.1 -57.4 62 -99 SPO 1997 04 15 11 50 7 7.8 -9 682.40 -57.3 -57.1 -57.4 63 -99 SPO 1997 04 15 11 51 7 7.7 -9 682.50 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 15 11 52 8 7.7 -9 682.50 -57.3 -57.2 -57.4 61 -99 SPO 1997 04 15 11 53 8 7.8 -9 682.50 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 15 11 54 9 7.8 -9 682.50 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 15 11 55 10 8.0 -9 682.50 -57.3 -57.2 -57.5 60 -99 SPO 1997 04 15 11 56 9 8.0 -9 682.50 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 15 11 57 10 8.0 -9 682.50 -57.3 -57.3 -57.5 60 -99 SPO 1997 04 15 11 58 11 7.9 -9 682.50 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 15 11 59 10 7.9 -9 682.50 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 15 12 00 11 7.8 -9 682.50 -57.4 -57.3 -57.5 61 0 SPO 1997 04 15 12 01 12 7.6 -9 682.50 -57.4 -57.3 -57.6 61 -99 SPO 1997 04 15 12 02 13 7.6 -9 682.60 -57.4 -57.3 -57.6 60 -99 SPO 1997 04 15 12 03 13 7.3 -9 682.60 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 12 04 13 7.6 -9 682.60 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 12 05 13 7.4 -9 682.60 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 12 06 14 7.2 -9 682.60 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 12 07 14 7.3 -9 682.60 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 15 12 08 15 7.2 -9 682.60 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 12 09 15 7.3 -9 682.60 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 12 10 14 7.3 -9 682.60 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 11 15 7.5 -9 682.60 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 12 16 7.5 -9 682.60 -57.5 -57.3 -57.5 62 -99 SPO 1997 04 15 12 13 16 7.3 -9 682.60 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 14 18 7.4 -9 682.60 -57.5 -57.3 -57.5 61 -99 SPO 1997 04 15 12 15 18 7.3 -9 682.60 -57.4 -57.3 -57.5 60 -99 SPO 1997 04 15 12 16 19 7.5 -9 682.60 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 12 17 19 7.4 -9 682.60 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 15 12 18 19 7.4 -9 682.60 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 15 12 19 18 7.3 -9 682.60 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 12 20 20 7.3 -9 682.60 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 12 21 20 7.2 -9 682.60 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 22 20 7.3 -9 682.70 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 23 19 7.3 -9 682.70 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 24 19 7.2 -9 682.70 -57.5 -57.2 -57.6 63 -99 SPO 1997 04 15 12 25 18 7.4 -9 682.70 -57.5 -57.2 -57.6 62 -99 SPO 1997 04 15 12 26 18 7.3 -9 682.70 -57.5 -57.2 -57.6 61 -99 SPO 1997 04 15 12 27 18 7.4 -9 682.70 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 15 12 28 19 7.3 -9 682.70 -57.6 -57.2 -57.6 60 -99 SPO 1997 04 15 12 29 18 7.2 -9 682.70 -57.6 -57.2 -57.7 60 -99 SPO 1997 04 15 12 30 18 7.0 -9 682.70 -57.6 -57.3 -57.7 60 -99 SPO 1997 04 15 12 31 17 7.2 -9 682.70 -57.6 -57.2 -57.6 60 -99 SPO 1997 04 15 12 32 16 7.4 -9 682.70 -57.6 -57.2 -57.6 62 -99 SPO 1997 04 15 12 33 17 7.3 -9 682.70 -57.6 -57.2 -57.6 62 -99 SPO 1997 04 15 12 34 17 7.5 -9 682.80 -57.6 -57.2 -57.6 62 -99 SPO 1997 04 15 12 35 16 7.4 -9 682.70 -57.6 -57.2 -57.7 62 -99 SPO 1997 04 15 12 36 17 7.4 -9 682.70 -57.6 -57.1 -57.7 60 -99 SPO 1997 04 15 12 37 18 7.4 -9 682.80 -57.6 -57.1 -57.7 60 -99 SPO 1997 04 15 12 38 19 7.3 -9 682.80 -57.6 -57.1 -57.7 59 -99 SPO 1997 04 15 12 39 20 7.1 -9 682.80 -57.6 -57.1 -57.7 59 -99 SPO 1997 04 15 12 40 20 7.2 -9 682.80 -57.6 -57.1 -57.7 59 -99 SPO 1997 04 15 12 41 20 7.5 -9 682.80 -57.6 -57.1 -57.7 59 -99 SPO 1997 04 15 12 42 21 7.2 -9 682.80 -57.6 -57.2 -57.7 59 -99 SPO 1997 04 15 12 43 21 7.0 -9 682.80 -57.6 -57.2 -57.7 59 -99 SPO 1997 04 15 12 44 21 7.1 -9 682.90 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 12 45 20 7.1 -9 682.90 -57.7 -57.3 -57.7 60 -99 SPO 1997 04 15 12 46 21 7.2 -9 682.90 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 15 12 47 21 7.1 -9 682.90 -57.7 -57.3 -57.8 60 -99 SPO 1997 04 15 12 48 22 7.4 -9 682.90 -57.7 -57.3 -57.8 59 -99 SPO 1997 04 15 12 49 21 7.1 -9 682.90 -57.7 -57.3 -57.8 59 -99 SPO 1997 04 15 12 50 22 7.3 -9 682.90 -57.7 -57.3 -57.8 59 -99 SPO 1997 04 15 12 51 23 7.0 -9 682.90 -57.7 -57.3 -57.8 59 -99 SPO 1997 04 15 12 52 22 6.9 -9 682.90 -57.7 -57.2 -57.8 59 -99 SPO 1997 04 15 12 53 22 7.4 -9 682.90 -57.7 -57.2 -57.8 59 -99 SPO 1997 04 15 12 54 21 7.2 -9 682.90 -57.8 -57.3 -57.9 59 -99 SPO 1997 04 15 12 55 22 7.1 -9 682.90 -57.8 -57.3 -57.8 59 -99 SPO 1997 04 15 12 56 20 7.0 -9 682.90 -57.8 -57.3 -57.8 59 -99 SPO 1997 04 15 12 57 21 7.2 -9 683.00 -57.8 -57.4 -57.8 59 -99 SPO 1997 04 15 12 58 20 7.2 -9 683.00 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 15 12 59 21 7.0 -9 683.00 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 15 13 00 21 7.1 -9 682.90 -57.7 -57.4 -57.8 59 0 SPO 1997 04 15 13 01 21 7.5 -9 682.90 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 15 13 02 22 7.4 -9 682.90 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 15 13 03 22 7.7 -9 682.90 -57.7 -57.4 -57.8 59 -99 SPO 1997 04 15 13 04 21 7.2 -9 682.90 -57.7 -57.4 -57.7 60 -99 SPO 1997 04 15 13 05 21 7.7 -9 682.90 -57.7 -57.4 -57.7 61 -99 SPO 1997 04 15 13 06 21 7.5 -9 682.90 -57.7 -57.3 -57.7 61 -99 SPO 1997 04 15 13 07 22 7.4 -9 682.90 -57.6 -57.3 -57.7 62 -99 SPO 1997 04 15 13 08 20 7.6 -9 682.90 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 15 13 09 21 7.7 -9 682.90 -57.6 -57.4 -57.7 62 -99 SPO 1997 04 15 13 10 21 7.8 -9 683.00 -57.6 -57.4 -57.7 60 -99 SPO 1997 04 15 13 11 19 7.5 -9 683.00 -57.7 -57.4 -57.7 60 -99 SPO 1997 04 15 13 12 20 7.4 -9 683.00 -57.7 -57.3 -57.7 59 -99 SPO 1997 04 15 13 13 19 7.6 -9 683.00 -57.6 -57.3 -57.7 58 -99 SPO 1997 04 15 13 14 19 7.3 -9 683.00 -57.6 -57.4 -57.7 58 -99 SPO 1997 04 15 13 15 19 7.5 -9 683.00 -57.7 -57.4 -57.7 59 -99 SPO 1997 04 15 13 16 18 7.3 -9 683.10 -57.7 -57.4 -57.7 59 -99 SPO 1997 04 15 13 17 18 7.5 -9 683.10 -57.7 -57.5 -57.8 59 -99 SPO 1997 04 15 13 18 18 7.5 -9 683.10 -57.7 -57.5 -57.7 59 -99 SPO 1997 04 15 13 19 18 7.7 -9 683.10 -57.7 -57.5 -57.7 60 -99 SPO 1997 04 15 13 20 18 7.4 -9 683.10 -57.7 -57.4 -57.7 60 -99 SPO 1997 04 15 13 21 18 7.5 -9 683.10 -57.7 -57.4 -57.8 61 -99 SPO 1997 04 15 13 22 18 7.5 -9 683.10 -57.7 -57.4 -57.8 61 -99 SPO 1997 04 15 13 23 18 7.5 -9 683.10 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 13 24 18 7.4 -9 683.10 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 13 25 18 7.6 -9 683.10 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 13 26 18 7.6 -9 683.10 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 13 27 16 7.4 -9 683.10 -57.7 -57.4 -57.8 60 -99 SPO 1997 04 15 13 28 16 7.6 -9 683.10 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 13 29 16 7.7 -9 683.10 -57.7 -57.5 -57.7 60 -99 SPO 1997 04 15 13 30 16 7.7 -9 683.10 -57.7 -57.5 -57.7 61 -99 SPO 1997 04 15 13 31 16 7.5 -9 683.10 -57.7 -57.5 -57.7 61 -99 SPO 1997 04 15 13 32 16 7.4 -9 683.10 -57.7 -57.6 -57.8 61 -99 SPO 1997 04 15 13 33 16 7.3 -9 683.10 -57.7 -57.6 -57.7 60 -99 SPO 1997 04 15 13 34 17 7.6 -9 683.20 -57.7 -57.6 -57.7 60 -99 SPO 1997 04 15 13 35 16 7.7 -9 683.20 -57.7 -57.5 -57.7 60 -99 SPO 1997 04 15 13 36 16 7.8 -9 683.20 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 13 37 16 7.6 -9 683.20 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 13 38 14 7.5 -9 683.20 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 13 39 13 7.4 -9 683.20 -57.6 -57.5 -57.7 60 -99 SPO 1997 04 15 13 40 15 7.5 -9 683.20 -57.6 -57.6 -57.7 62 -99 SPO 1997 04 15 13 41 14 7.6 -9 683.10 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 13 42 14 7.5 -9 683.10 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 13 43 13 7.6 -9 683.10 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 13 44 13 7.9 -9 683.10 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 13 45 13 7.7 -9 683.10 -57.6 -57.6 -57.7 60 -99 SPO 1997 04 15 13 46 13 8.1 -9 683.10 -57.6 -57.6 -57.7 59 -99 SPO 1997 04 15 13 47 13 7.7 -9 683.10 -57.6 -57.6 -57.7 59 -99 SPO 1997 04 15 13 48 12 7.9 -9 683.10 -57.6 -57.7 -57.7 59 -99 SPO 1997 04 15 13 49 12 7.9 -9 683.20 -57.6 -57.7 -57.7 59 -99 SPO 1997 04 15 13 50 13 8.0 -9 683.20 -57.6 -57.7 -57.7 59 -99 SPO 1997 04 15 13 51 12 7.9 -9 683.20 -57.6 -57.6 -57.7 60 -99 SPO 1997 04 15 13 52 11 8.2 -9 683.20 -57.6 -57.6 -57.7 60 -99 SPO 1997 04 15 13 53 12 8.0 -9 683.20 -57.6 -57.6 -57.7 60 -99 SPO 1997 04 15 13 54 12 8.0 -9 683.20 -57.6 -57.6 -57.7 62 -99 SPO 1997 04 15 13 55 12 8.1 -9 683.20 -57.6 -57.6 -57.7 62 -99 SPO 1997 04 15 13 56 12 8.1 -9 683.20 -57.6 -57.6 -57.8 60 -99 SPO 1997 04 15 13 57 13 7.9 -9 683.20 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 15 13 58 14 7.7 -9 683.20 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 15 13 59 13 8.1 -9 683.20 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 00 14 8.1 -9 683.20 -57.7 -57.6 -57.8 59 0 SPO 1997 04 15 14 01 14 8.2 -9 683.20 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 02 13 8.2 -9 683.20 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 15 14 03 14 8.3 -9 683.20 -57.7 -57.7 -57.7 60 -99 SPO 1997 04 15 14 04 14 8.5 -9 683.20 -57.7 -57.6 -57.7 60 -99 SPO 1997 04 15 14 05 14 8.3 -9 683.20 -57.7 -57.6 -57.7 60 -99 SPO 1997 04 15 14 06 16 8.2 -9 683.20 -57.7 -57.6 -57.7 61 -99 SPO 1997 04 15 14 07 15 8.2 -9 683.20 -57.7 -57.6 -57.7 61 -99 SPO 1997 04 15 14 08 16 8.2 -9 683.20 -57.6 -57.6 -57.7 59 -99 SPO 1997 04 15 14 09 17 7.9 -9 683.20 -57.6 -57.6 -57.7 59 -99 SPO 1997 04 15 14 10 17 7.8 -9 683.20 -57.6 -57.6 -57.7 59 -99 SPO 1997 04 15 14 11 18 8.0 -9 683.20 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 14 12 18 7.7 -9 683.30 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 14 13 20 7.6 -9 683.30 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 14 14 20 7.7 -9 683.30 -57.6 -57.5 -57.7 59 -99 SPO 1997 04 15 14 15 20 7.6 -9 683.30 -57.6 -57.4 -57.7 59 -99 SPO 1997 04 15 14 16 20 7.7 -9 683.30 -57.6 -57.4 -57.6 60 -99 SPO 1997 04 15 14 17 21 7.5 -9 683.30 -57.6 -57.5 -57.6 60 -99 SPO 1997 04 15 14 18 21 7.5 -9 683.30 -57.6 -57.5 -57.6 62 -99 SPO 1997 04 15 14 19 21 7.7 -9 683.30 -57.6 -57.5 -57.6 62 -99 SPO 1997 04 15 14 20 21 7.7 -9 683.30 -57.6 -57.5 -57.6 62 -99 SPO 1997 04 15 14 21 21 7.7 -9 683.30 -57.6 -57.5 -57.6 60 -99 SPO 1997 04 15 14 22 21 7.6 -9 683.30 -57.6 -57.5 -57.6 60 -99 SPO 1997 04 15 14 23 22 7.4 -9 683.40 -57.6 -57.5 -57.7 60 -99 SPO 1997 04 15 14 24 22 7.7 -9 683.40 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 14 25 22 7.8 -9 683.40 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 14 26 23 7.6 -9 683.40 -57.6 -57.5 -57.8 62 -99 SPO 1997 04 15 14 27 23 7.5 -9 683.40 -57.6 -57.5 -57.8 62 -99 SPO 1997 04 15 14 28 23 7.5 -9 683.40 -57.7 -57.5 -57.8 63 -99 SPO 1997 04 15 14 29 21 7.6 -9 683.40 -57.7 -57.5 -57.8 63 -99 SPO 1997 04 15 14 30 20 7.8 -9 683.40 -57.7 -57.5 -57.7 63 -99 SPO 1997 04 15 14 31 20 8.1 -9 683.40 -57.7 -57.5 -57.7 61 -99 SPO 1997 04 15 14 32 20 7.6 -9 683.40 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 14 33 21 7.5 -9 683.40 -57.7 -57.5 -57.8 60 -99 SPO 1997 04 15 14 34 21 7.2 -9 683.50 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 15 14 35 22 7.0 -9 683.50 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 15 14 36 21 7.1 -9 683.50 -57.7 -57.6 -57.8 61 -99 SPO 1997 04 15 14 37 21 7.3 -9 683.50 -57.7 -57.7 -57.8 61 -99 SPO 1997 04 15 14 38 22 7.2 -9 683.60 -57.7 -57.6 -57.8 61 -99 SPO 1997 04 15 14 39 21 7.0 -9 683.60 -57.7 -57.7 -57.8 61 -99 SPO 1997 04 15 14 40 19 6.8 -9 683.60 -57.7 -57.7 -57.8 61 -99 SPO 1997 04 15 14 41 18 7.2 -9 683.60 -57.7 -57.6 -57.8 60 -99 SPO 1997 04 15 14 42 17 7.1 -9 683.60 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 43 17 7.2 -9 683.60 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 44 17 7.1 -9 683.60 -57.8 -57.6 -57.8 59 -99 SPO 1997 04 15 14 45 17 7.5 -9 683.60 -57.8 -57.6 -57.8 59 -99 SPO 1997 04 15 14 46 17 7.4 -9 683.60 -57.8 -57.6 -57.8 59 -99 SPO 1997 04 15 14 47 17 7.8 -9 683.60 -57.8 -57.6 -57.8 59 -99 SPO 1997 04 15 14 48 17 7.7 -9 683.50 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 49 17 8.1 -9 683.50 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 14 50 17 7.8 -9 683.50 -57.7 -57.7 -57.8 60 -99 SPO 1997 04 15 14 51 18 7.8 -9 683.50 -57.8 -57.7 -57.8 61 -99 SPO 1997 04 15 14 52 19 7.5 -9 683.60 -57.8 -57.7 -57.9 61 -99 SPO 1997 04 15 14 53 18 7.3 -9 683.60 -57.8 -57.7 -57.9 61 -99 SPO 1997 04 15 14 54 19 7.5 -9 683.60 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 14 55 20 7.5 -9 683.60 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 14 56 21 7.3 -9 683.60 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 14 57 21 7.3 -9 683.60 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 15 14 58 23 7.3 -9 683.60 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 15 14 59 23 7.1 -9 683.60 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 15 00 23 7.0 -9 683.60 -57.8 -57.7 -57.9 60 0 SPO 1997 04 15 15 01 24 7.0 -9 683.70 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 15 02 22 7.1 -9 683.70 -57.8 -57.7 -57.9 60 -99 SPO 1997 04 15 15 03 22 7.0 -9 683.70 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 15 15 04 22 7.0 -9 683.70 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 15 15 05 22 6.8 -9 683.70 -57.8 -57.7 -57.9 59 -99 SPO 1997 04 15 15 06 23 6.9 -9 683.70 -57.8 -57.8 -57.9 59 -99 SPO 1997 04 15 15 07 23 6.9 -9 683.70 -57.8 -57.8 -57.9 59 -99 SPO 1997 04 15 15 08 23 7.2 -9 683.70 -57.8 -57.8 -58.0 59 -99 SPO 1997 04 15 15 09 23 7.0 -9 683.70 -57.9 -57.8 -57.9 59 -99 SPO 1997 04 15 15 10 23 7.2 -9 683.70 -57.9 -57.8 -58.0 60 -99 SPO 1997 04 15 15 11 22 7.5 -9 683.70 -57.9 -57.8 -58.0 60 -99 SPO 1997 04 15 15 12 21 6.9 -9 683.70 -57.9 -57.8 -58.0 60 -99 SPO 1997 04 15 15 13 20 7.5 -9 683.70 -57.9 -57.8 -58.0 60 -99 SPO 1997 04 15 15 14 18 7.4 -9 683.80 -57.9 -57.8 -58.1 60 -99 SPO 1997 04 15 15 15 16 7.3 -9 683.80 -57.9 -57.8 -58.1 60 -99 SPO 1997 04 15 15 16 15 7.4 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 17 16 7.7 -9 683.80 -58.0 -57.8 -58.0 59 -99 SPO 1997 04 15 15 18 14 7.5 -9 683.80 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 15 15 19 14 7.4 -9 683.80 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 15 15 20 13 7.5 -9 683.80 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 15 15 21 13 7.7 -9 683.80 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 15 15 22 12 7.7 -9 683.80 -58.0 -57.9 -58.1 59 -99 SPO 1997 04 15 15 23 13 7.5 -9 683.80 -58.0 -58.0 -58.2 59 -99 SPO 1997 04 15 15 24 12 7.4 -9 683.80 -58.1 -57.9 -58.2 60 -99 SPO 1997 04 15 15 25 12 7.3 -9 683.80 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 15 15 26 13 7.7 -9 683.80 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 15 15 27 13 7.7 -9 683.80 -58.1 -57.9 -58.2 59 -99 SPO 1997 04 15 15 28 13 8.1 -9 683.80 -58.1 -57.9 -58.2 59 -99 SPO 1997 04 15 15 29 12 7.9 -9 683.80 -58.1 -57.8 -58.1 59 -99 SPO 1997 04 15 15 30 12 7.6 -9 683.80 -58.1 -57.8 -58.1 59 -99 SPO 1997 04 15 15 31 12 7.8 -9 683.80 -58.1 -57.8 -58.2 59 -99 SPO 1997 04 15 15 32 13 7.8 -9 683.80 -58.1 -57.8 -58.2 59 -99 SPO 1997 04 15 15 33 12 7.8 -9 683.80 -58.1 -57.8 -58.1 60 -99 SPO 1997 04 15 15 34 12 7.7 -9 683.80 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 15 15 35 13 7.7 -9 683.80 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 15 15 36 13 7.6 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 37 13 7.7 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 38 12 8.0 -9 683.70 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 39 10 8.1 -9 683.70 -58.0 -57.8 -58.0 59 -99 SPO 1997 04 15 15 40 9 8.2 -9 683.70 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 15 15 41 10 7.8 -9 683.70 -58.0 -57.7 -58.0 59 -99 SPO 1997 04 15 15 42 11 8.2 -9 683.80 -58.0 -57.7 -58.0 59 -99 SPO 1997 04 15 15 43 13 7.8 -9 683.80 -58.0 -57.8 -58.0 59 -99 SPO 1997 04 15 15 44 13 7.8 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 45 14 7.4 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 46 12 7.4 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 47 14 7.6 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 48 14 7.6 -9 683.80 -58.0 -57.8 -58.2 60 -99 SPO 1997 04 15 15 49 15 7.6 -9 683.80 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 15 15 50 13 7.9 -9 683.80 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 15 15 51 13 7.6 -9 683.80 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 15 15 52 13 7.6 -9 683.80 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 15 15 53 12 7.9 -9 683.80 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 15 15 54 11 8.0 -9 683.80 -58.0 -57.8 -58.0 59 -99 SPO 1997 04 15 15 55 11 7.9 -9 683.80 -58.0 -57.8 -58.0 60 -99 SPO 1997 04 15 15 56 12 7.8 -9 683.80 -58.0 -57.8 -58.0 60 -99 SPO 1997 04 15 15 57 12 8.3 -9 683.80 -58.0 -57.7 -58.0 61 -99 SPO 1997 04 15 15 58 11 8.1 -9 683.80 -57.9 -57.6 -57.9 60 -99 SPO 1997 04 15 15 59 12 8.1 -9 683.80 -57.9 -57.7 -57.9 61 -99 SPO 1997 04 15 16 00 11 7.8 -9 683.90 -57.8 -57.6 -57.9 60 0 SPO 1997 04 15 16 01 10 8.0 -9 683.90 -57.8 -57.6 -57.9 60 -99 SPO 1997 04 15 16 02 10 8.3 -9 683.90 -57.8 -57.6 -57.8 60 -99 SPO 1997 04 15 16 03 10 8.3 -9 683.90 -57.8 -57.6 -57.8 60 -99 SPO 1997 04 15 16 04 10 8.2 -9 683.90 -57.8 -57.6 -57.8 60 -99 SPO 1997 04 15 16 05 9 8.1 -9 683.90 -57.8 -57.6 -57.8 60 -99 SPO 1997 04 15 16 06 8 8.9 -9 683.90 -57.7 -57.6 -57.8 59 -99 SPO 1997 04 15 16 07 7 8.6 -9 683.90 -57.7 -57.5 -57.7 60 -99 SPO 1997 04 15 16 08 6 8.6 -9 683.90 -57.7 -57.5 -57.7 61 -99 SPO 1997 04 15 16 09 5 8.6 -9 683.90 -57.7 -57.5 -57.7 63 -99 SPO 1997 04 15 16 10 6 8.8 -9 683.80 -57.6 -57.5 -57.7 62 -99 SPO 1997 04 15 16 11 5 8.8 -9 683.80 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 15 16 12 5 8.6 -9 683.90 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 15 16 13 4 8.7 -9 683.90 -57.6 -57.4 -57.6 62 -99 SPO 1997 04 15 16 14 4 8.6 -9 683.90 -57.6 -57.3 -57.6 60 -99 SPO 1997 04 15 16 15 4 8.3 -9 683.90 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 16 16 4 8.5 -9 683.90 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 16 17 4 8.5 -9 683.90 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 16 18 4 8.3 -9 683.90 -57.5 -57.3 -57.6 61 -99 SPO 1997 04 15 16 19 4 8.4 -9 683.90 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 15 16 20 5 8.3 -9 683.90 -57.5 -57.3 -57.6 62 -99 SPO 1997 04 15 16 21 6 8.3 -9 683.90 -57.5 -57.2 -57.5 62 -99 SPO 1997 04 15 16 22 6 8.6 -9 683.90 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 15 16 23 7 8.2 -9 683.90 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 15 16 24 7 8.3 -9 684.00 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 15 16 25 7 8.2 -9 684.00 -57.4 -57.3 -57.4 61 -99 SPO 1997 04 15 16 26 8 8.3 -9 684.00 -57.4 -57.2 -57.4 60 -99 SPO 1997 04 15 16 27 9 8.0 -9 684.00 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 15 16 28 9 7.9 -9 684.00 -57.3 -57.2 -57.4 60 -99 SPO 1997 04 15 16 29 9 8.0 -9 684.10 -57.3 -57.1 -57.4 60 -99 SPO 1997 04 15 16 30 9 7.8 -9 684.10 -57.3 -57.0 -57.3 61 -99 SPO 1997 04 15 16 31 9 7.5 -9 684.10 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 15 16 32 8 7.5 -9 684.20 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 15 16 33 9 8.0 -9 684.20 -57.2 -57.1 -57.2 62 -99 SPO 1997 04 15 16 34 9 8.0 -9 684.20 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 15 16 35 9 7.7 -9 684.20 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 15 16 36 9 7.8 -9 684.20 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 15 16 37 8 7.6 -9 684.20 -57.1 -57.1 -57.2 60 -99 SPO 1997 04 15 16 38 9 7.8 -9 684.20 -57.1 -57.1 -57.3 60 -99 SPO 1997 04 15 16 39 9 7.8 -9 684.20 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 16 40 10 7.7 -9 684.30 -57.2 -57.2 -57.3 60 -99 SPO 1997 04 15 16 41 9 7.6 -9 684.30 -57.2 -57.2 -57.3 60 -99 SPO 1997 04 15 16 42 8 7.7 -9 684.30 -57.2 -57.2 -57.4 61 -99 SPO 1997 04 15 16 43 8 7.5 -9 684.30 -57.2 -57.2 -57.3 61 -99 SPO 1997 04 15 16 44 9 7.7 -9 684.30 -57.2 -57.2 -57.4 60 -99 SPO 1997 04 15 16 45 8 7.7 -9 684.30 -57.3 -57.2 -57.4 62 -99 SPO 1997 04 15 16 46 9 7.7 -9 684.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 15 16 47 8 7.9 -9 684.30 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 16 48 10 7.6 -9 684.30 -57.2 -57.1 -57.3 60 -99 SPO 1997 04 15 16 49 10 7.7 -9 684.30 -57.2 -57.1 -57.4 60 -99 SPO 1997 04 15 16 50 9 7.5 -9 684.30 -57.2 -57.1 -57.4 60 -99 SPO 1997 04 15 16 51 9 7.7 -9 684.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 15 16 52 10 7.4 -9 684.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 15 16 53 10 7.2 -9 684.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 15 16 54 11 7.3 -9 684.30 -57.3 -57.1 -57.4 61 -99 SPO 1997 04 15 16 55 10 7.3 -9 684.30 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 15 16 56 10 7.2 -9 684.40 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 15 16 57 9 7.4 -9 684.40 -57.3 -57.2 -57.3 62 -99 SPO 1997 04 15 16 58 9 7.0 -9 684.40 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 15 16 59 10 6.9 -9 684.40 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 15 17 00 10 6.8 -9 684.40 -57.2 -57.1 -57.2 61 0 SPO 1997 04 15 17 01 11 7.0 -9 684.40 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 15 17 02 12 6.9 -9 684.40 -57.2 -57.1 -57.2 60 -99 SPO 1997 04 15 17 03 13 6.7 -9 684.40 -57.2 -57.1 -57.2 61 -99 SPO 1997 04 15 17 04 13 6.7 -9 684.40 -57.1 -57.1 -57.2 60 -99 SPO 1997 04 15 17 05 14 6.8 -9 684.40 -57.1 -57.1 -57.2 61 -99 SPO 1997 04 15 17 06 13 7.1 -9 684.40 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 15 17 07 13 6.9 -9 684.40 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 15 17 08 13 7.0 -9 684.40 -57.1 -57.0 -57.2 61 -99 SPO 1997 04 15 17 09 13 6.9 -9 684.40 -57.1 -57.0 -57.1 61 -99 SPO 1997 04 15 17 10 13 7.0 -9 684.40 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 15 17 11 12 7.2 -9 684.40 -57.0 -57.0 -57.1 60 -99 SPO 1997 04 15 17 12 12 7.2 -9 684.40 -57.0 -57.0 -57.1 -99 -99 SPO 1997 04 15 17 13 13 7.0 -9 684.40 -57.0 -57.0 -57.0 -99 -99 SPO 1997 04 15 17 14 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 15 17 15 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 15 17 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 15 17 17 -999 -99.9 -9 684.50 -56.9 -56.9 -57.0 -99 -99 SPO 1997 04 15 17 18 12 7.4 -9 684.50 -56.9 -56.9 -57.0 -99 -99 SPO 1997 04 15 17 19 12 7.3 -9 684.50 -56.9 -56.9 -57.0 62 -99 SPO 1997 04 15 17 20 12 7.8 -9 684.40 -56.9 -56.8 -57.0 62 -99 SPO 1997 04 15 17 21 12 7.8 -9 684.40 -56.9 -56.8 -57.0 62 -99 SPO 1997 04 15 17 22 13 7.9 -9 684.40 -56.9 -56.8 -56.9 62 -99 SPO 1997 04 15 17 23 12 7.7 -9 684.50 -56.9 -56.8 -56.9 62 -99 SPO 1997 04 15 17 24 12 7.9 -9 684.50 -56.8 -56.8 -56.9 61 -99 SPO 1997 04 15 17 25 12 7.5 -9 684.50 -56.8 -56.8 -56.9 61 -99 SPO 1997 04 15 17 26 12 7.6 -9 684.50 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 27 12 7.7 -9 684.50 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 28 11 7.6 -9 684.50 -56.8 -56.8 -57.0 60 -99 SPO 1997 04 15 17 29 10 7.7 -9 684.60 -56.9 -56.8 -57.0 61 -99 SPO 1997 04 15 17 30 10 7.6 -9 684.50 -56.8 -56.8 -56.9 60 -99 SPO 1997 04 15 17 31 10 8.0 -9 684.60 -56.8 -56.8 -56.9 60 -99 SPO 1997 04 15 17 32 10 7.8 -9 684.60 -56.8 -56.8 -56.9 61 -99 SPO 1997 04 15 17 33 10 8.1 -9 684.60 -56.9 -56.8 -56.9 62 -99 SPO 1997 04 15 17 34 10 8.2 -9 684.60 -56.8 -56.8 -56.9 60 -99 SPO 1997 04 15 17 35 11 8.0 -9 684.60 -56.8 -56.8 -56.9 60 -99 SPO 1997 04 15 17 36 10 7.8 -9 684.60 -56.8 -56.8 -56.9 60 -99 SPO 1997 04 15 17 37 10 8.2 -9 684.60 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 38 11 8.4 -9 684.60 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 39 11 8.2 -9 684.60 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 40 10 7.8 -9 684.60 -56.8 -56.7 -56.9 60 -99 SPO 1997 04 15 17 41 9 7.8 -9 684.60 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 15 17 42 9 8.0 -9 684.60 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 15 17 43 9 7.9 -9 684.70 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 15 17 44 8 7.9 -9 684.70 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 15 17 45 8 8.2 -9 684.70 -56.8 -56.7 -56.9 61 -99 SPO 1997 04 15 17 46 8 8.2 -9 684.70 -56.8 -56.7 -56.8 61 -99 SPO 1997 04 15 17 47 8 8.3 -9 684.70 -56.7 -56.7 -56.8 60 -99 SPO 1997 04 15 17 48 7 8.1 -9 684.70 -56.8 -56.7 -56.8 61 -99 SPO 1997 04 15 17 49 6 8.1 -9 684.60 -56.8 -56.7 -56.8 61 -99 SPO 1997 04 15 17 50 7 8.1 -9 684.70 -56.7 -56.7 -56.8 60 -99 SPO 1997 04 15 17 51 7 8.2 -9 684.70 -56.7 -56.6 -56.8 61 -99 SPO 1997 04 15 17 52 6 8.3 -9 684.70 -56.7 -56.6 -56.8 61 -99 SPO 1997 04 15 17 53 6 8.1 -9 684.70 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 15 17 54 5 8.3 -9 684.70 -56.7 -56.5 -56.7 62 -99 SPO 1997 04 15 17 55 5 7.9 -9 684.70 -56.7 -56.4 -56.8 62 -99 SPO 1997 04 15 17 56 5 8.0 -9 684.70 -56.7 -56.4 -56.7 62 -99 SPO 1997 04 15 17 57 6 8.0 -9 684.80 -56.6 -56.4 -56.7 61 -99 SPO 1997 04 15 17 58 6 8.1 -9 684.80 -56.6 -56.4 -56.7 60 -99 SPO 1997 04 15 17 59 6 7.8 -9 684.80 -56.6 -56.4 -56.7 60 -99 SPO 1997 04 15 18 00 5 7.8 -9 684.80 -56.6 -56.4 -56.7 60 0 SPO 1997 04 15 18 01 4 7.5 -9 684.80 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 15 18 02 5 7.7 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 03 5 7.7 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 04 6 8.0 -9 684.80 -56.7 -56.5 -56.7 63 -99 SPO 1997 04 15 18 05 6 8.2 -9 684.80 -56.7 -56.5 -56.6 63 -99 SPO 1997 04 15 18 06 6 7.8 -9 684.80 -56.6 -56.5 -56.7 63 -99 SPO 1997 04 15 18 07 8 8.2 -9 684.80 -56.5 -56.5 -56.7 62 -99 SPO 1997 04 15 18 08 6 8.4 -9 684.80 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 15 18 09 6 8.2 -9 684.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 10 6 8.5 -9 684.80 -56.6 -56.4 -56.6 61 -99 SPO 1997 04 15 18 11 6 8.2 -9 684.80 -56.6 -56.5 -56.6 61 -99 SPO 1997 04 15 18 12 6 7.9 -9 684.80 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 15 18 13 6 8.0 -9 684.80 -56.6 -56.5 -56.8 60 -99 SPO 1997 04 15 18 14 7 7.9 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 15 7 8.1 -9 684.80 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 18 16 7 8.1 -9 684.80 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 18 17 7 8.0 -9 684.80 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 15 18 18 6 8.4 -9 684.80 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 15 18 19 6 8.1 -9 684.80 -56.6 -56.6 -56.7 62 -99 SPO 1997 04 15 18 20 6 8.1 -9 684.80 -56.7 -56.6 -56.7 63 -99 SPO 1997 04 15 18 21 5 8.1 -9 684.80 -56.7 -56.6 -56.7 62 -99 SPO 1997 04 15 18 22 6 8.4 -9 684.80 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 18 23 6 8.6 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 24 6 8.5 -9 684.80 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 18 25 6 8.3 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 26 6 8.7 -9 684.80 -56.6 -56.4 -56.7 61 -99 SPO 1997 04 15 18 27 5 8.3 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 28 6 8.4 -9 684.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 29 6 8.4 -9 684.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 30 6 8.2 -9 684.80 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 31 6 8.2 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 32 7 8.0 -9 684.80 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 33 6 8.0 -9 684.90 -56.6 -56.6 -56.7 60 -99 SPO 1997 04 15 18 34 5 8.2 -9 684.90 -56.6 -56.6 -56.7 60 -99 SPO 1997 04 15 18 35 5 8.5 -9 684.90 -56.6 -56.6 -56.7 60 -99 SPO 1997 04 15 18 36 5 8.1 -9 684.90 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 18 37 5 7.8 -9 684.90 -56.7 -56.6 -56.7 62 -99 SPO 1997 04 15 18 38 5 8.3 -9 684.90 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 39 3 8.0 -9 684.90 -56.5 -56.5 -56.7 61 -99 SPO 1997 04 15 18 40 5 7.8 -9 684.90 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 41 5 7.7 -9 684.90 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 42 5 7.5 -9 684.90 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 43 5 7.8 -9 684.90 -56.6 -56.4 -56.7 61 -99 SPO 1997 04 15 18 44 5 7.5 -9 685.00 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 15 18 45 5 7.6 -9 685.00 -56.6 -56.5 -56.8 60 -99 SPO 1997 04 15 18 46 5 7.7 -9 685.00 -56.6 -56.4 -56.7 60 -99 SPO 1997 04 15 18 47 5 7.8 -9 685.00 -56.6 -56.4 -56.7 60 -99 SPO 1997 04 15 18 48 4 7.9 -9 685.00 -56.6 -56.5 -56.7 60 -99 SPO 1997 04 15 18 49 4 7.7 -9 685.00 -56.6 -56.5 -56.7 61 -99 SPO 1997 04 15 18 50 5 7.9 -9 685.00 -56.6 -56.4 -56.7 61 -99 SPO 1997 04 15 18 51 4 8.0 -9 685.00 -56.6 -56.5 -56.7 62 -99 SPO 1997 04 15 18 52 4 7.9 -9 685.00 -56.6 -56.5 -56.6 63 -99 SPO 1997 04 15 18 53 4 8.2 -9 685.00 -56.6 -56.4 -56.6 63 -99 SPO 1997 04 15 18 54 5 7.4 -9 685.00 -56.6 -56.4 -56.6 62 -99 SPO 1997 04 15 18 55 6 7.7 -9 685.00 -56.6 -56.4 -56.7 62 -99 SPO 1997 04 15 18 56 7 7.6 -9 685.00 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 18 57 6 7.5 -9 685.00 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 18 58 4 7.3 -9 685.00 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 18 59 6 7.4 -9 685.10 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 15 19 00 5 7.1 -9 685.10 -56.5 -56.4 -56.6 61 0 SPO 1997 04 15 19 01 6 7.4 -9 685.10 -56.5 -56.4 -56.7 61 -99 SPO 1997 04 15 19 02 6 7.3 -9 685.10 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 03 6 7.4 -9 685.10 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 04 5 7.7 -9 685.10 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 05 5 7.2 -9 685.10 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 06 7 7.4 -9 685.10 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 07 4 7.5 -9 685.10 -56.6 -56.5 -56.6 61 -99 SPO 1997 04 15 19 08 5 7.7 -9 685.10 -56.6 -56.5 -56.6 60 -99 SPO 1997 04 15 19 09 2 7.6 -9 685.10 -56.6 -56.6 -56.6 60 -99 SPO 1997 04 15 19 10 2 7.6 -9 685.20 -56.6 -56.6 -56.6 60 -99 SPO 1997 04 15 19 11 3 7.3 -9 685.20 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 19 12 4 7.5 -9 685.20 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 13 4 7.7 -9 685.20 -56.5 -56.6 -56.6 61 -99 SPO 1997 04 15 19 14 5 7.4 -9 685.20 -56.5 -56.5 -56.6 62 -99 SPO 1997 04 15 19 15 5 7.7 -9 685.20 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 15 19 16 6 7.2 -9 685.20 -56.5 -56.5 -56.6 62 -99 SPO 1997 04 15 19 17 6 7.4 -9 685.20 -56.5 -56.4 -56.6 62 -99 SPO 1997 04 15 19 18 6 7.0 -9 685.30 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 19 7 7.3 -9 685.30 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 20 8 7.3 -9 685.30 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 21 7 7.0 -9 685.30 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 22 6 7.2 -9 685.30 -56.4 -56.5 -56.6 60 -99 SPO 1997 04 15 19 23 6 6.9 -9 685.40 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 24 7 7.0 -9 685.40 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 25 7 6.8 -9 685.40 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 26 7 6.7 -9 685.40 -56.6 -56.6 -56.6 63 -99 SPO 1997 04 15 19 27 8 7.0 -9 685.40 -56.6 -56.5 -56.6 63 -99 SPO 1997 04 15 19 28 8 6.7 -9 685.40 -56.4 -56.5 -56.6 61 -99 SPO 1997 04 15 19 29 9 6.6 -9 685.50 -56.5 -56.5 -56.6 62 -99 SPO 1997 04 15 19 30 9 6.4 -9 685.50 -56.5 -56.5 -56.6 61 -99 SPO 1997 04 15 19 31 10 6.3 -9 685.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 32 8 6.6 -9 685.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 33 9 6.2 -9 685.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 34 8 6.4 -9 685.50 -56.5 -56.4 -56.6 61 -99 SPO 1997 04 15 19 35 8 6.4 -9 685.50 -56.5 -56.3 -56.6 61 -99 SPO 1997 04 15 19 36 8 6.3 -9 685.50 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 15 19 37 7 6.8 -9 685.50 -56.5 -56.3 -56.5 62 -99 SPO 1997 04 15 19 38 7 6.7 -9 685.60 -56.4 -56.4 -56.5 62 -99 SPO 1997 04 15 19 39 7 6.5 -9 685.60 -56.5 -56.4 -56.5 63 -99 SPO 1997 04 15 19 40 7 6.5 -9 685.60 -56.5 -56.4 -56.5 62 -99 SPO 1997 04 15 19 41 8 6.5 -9 685.60 -56.5 -56.4 -56.5 61 -99 SPO 1997 04 15 19 42 8 6.7 -9 685.60 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 15 19 43 7 6.6 -9 685.60 -56.5 -56.3 -56.5 61 -99 SPO 1997 04 15 19 44 6 6.7 -9 685.60 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 15 19 45 7 6.8 -9 685.60 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 15 19 46 7 7.0 -9 685.60 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 15 19 47 6 7.2 -9 685.60 -56.4 -56.3 -56.5 61 -99 SPO 1997 04 15 19 48 7 7.4 -9 685.60 -56.4 -56.2 -56.5 62 -99 SPO 1997 04 15 19 49 7 7.1 -9 685.60 -56.4 -56.1 -56.5 62 -99 SPO 1997 04 15 19 50 7 7.2 -9 685.60 -56.4 -56.1 -56.4 62 -99 SPO 1997 04 15 19 51 6 7.1 -9 685.60 -56.4 -56.0 -56.4 62 -99 SPO 1997 04 15 19 52 7 7.0 -9 685.60 -56.4 -56.0 -56.4 61 -99 SPO 1997 04 15 19 53 9 6.9 -9 685.60 -56.3 -56.0 -56.4 61 -99 SPO 1997 04 15 19 54 8 7.0 -9 685.60 -56.3 -56.1 -56.4 61 -99 SPO 1997 04 15 19 55 6 7.1 -9 685.60 -56.4 -56.1 -56.4 61 -99 SPO 1997 04 15 19 56 7 7.2 -9 685.60 -56.3 -56.1 -56.4 61 -99 SPO 1997 04 15 19 57 8 7.4 -9 685.60 -56.3 -56.1 -56.4 61 -99 SPO 1997 04 15 19 58 7 7.6 -9 685.70 -56.3 -56.1 -56.4 61 -99 SPO 1997 04 15 19 59 7 7.6 -9 685.60 -56.4 -56.1 -56.4 63 -99 SPO 1997 04 15 20 00 7 7.6 -9 685.60 -56.4 -56.0 -56.4 63 0 SPO 1997 04 15 20 01 7 7.9 -9 685.60 -56.2 -56.0 -56.4 62 -99 SPO 1997 04 15 20 02 6 7.8 -9 685.60 -56.3 -56.0 -56.4 63 -99 SPO 1997 04 15 20 03 6 7.7 -9 685.60 -56.3 -56.0 -56.4 63 -99 SPO 1997 04 15 20 04 7 7.8 -9 685.60 -56.3 -56.0 -56.4 62 -99 SPO 1997 04 15 20 05 7 7.9 -9 685.60 -56.3 -55.9 -56.4 61 -99 SPO 1997 04 15 20 06 4 8.0 -9 685.60 -56.3 -55.9 -56.4 61 -99 SPO 1997 04 15 20 07 3 8.4 -9 685.60 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 15 20 08 3 8.4 -9 685.60 -56.3 -55.8 -56.3 61 -99 SPO 1997 04 15 20 09 5 8.2 -9 685.60 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 15 20 10 5 8.0 -9 685.60 -56.2 -55.9 -56.4 61 -99 SPO 1997 04 15 20 11 6 7.8 -9 685.60 -56.3 -55.9 -56.4 61 -99 SPO 1997 04 15 20 12 6 8.1 -9 685.70 -56.3 -55.9 -56.4 61 -99 SPO 1997 04 15 20 13 8 8.1 -9 685.70 -56.3 -55.9 -56.4 62 -99 SPO 1997 04 15 20 14 8 7.8 -9 685.70 -56.3 -56.0 -56.4 61 -99 SPO 1997 04 15 20 15 8 7.9 -9 685.70 -56.4 -56.0 -56.4 62 -99 SPO 1997 04 15 20 16 7 7.5 -9 685.70 -56.4 -56.0 -56.4 61 -99 SPO 1997 04 15 20 17 8 7.8 -9 685.70 -56.3 -55.9 -56.4 61 -99 SPO 1997 04 15 20 18 9 7.7 -9 685.80 -56.3 -56.0 -56.4 60 -99 SPO 1997 04 15 20 19 10 7.6 -9 685.80 -56.3 -56.0 -56.5 60 -99 SPO 1997 04 15 20 20 11 7.6 -9 685.80 -56.4 -56.0 -56.5 61 -99 SPO 1997 04 15 20 21 11 7.5 -9 685.80 -56.4 -56.0 -56.6 61 -99 SPO 1997 04 15 20 22 13 6.9 -9 685.80 -56.4 -56.0 -56.6 61 -99 SPO 1997 04 15 20 23 12 7.1 -9 685.80 -56.5 -56.0 -56.6 62 -99 SPO 1997 04 15 20 24 13 7.1 -9 685.80 -56.5 -56.0 -56.6 61 -99 SPO 1997 04 15 20 25 14 6.7 -9 685.90 -56.5 -56.1 -56.6 61 -99 SPO 1997 04 15 20 26 15 6.8 -9 685.90 -56.5 -56.2 -56.7 61 -99 SPO 1997 04 15 20 27 16 6.6 -9 685.90 -56.5 -56.3 -56.7 60 -99 SPO 1997 04 15 20 28 16 6.4 -9 685.90 -56.6 -56.3 -56.7 60 -99 SPO 1997 04 15 20 29 16 6.7 -9 686.00 -56.7 -56.4 -56.7 60 -99 SPO 1997 04 15 20 30 -999 -99.9 -9 686.00 -56.7 -56.5 -56.9 60 -99 SPO 1997 04 15 20 31 -999 -99.9 -9 686.00 -56.7 -56.5 -56.9 60 -99 SPO 1997 04 15 20 32 19 6.4 -9 686.00 -56.8 -56.5 -56.9 61 -99 SPO 1997 04 15 20 33 19 6.7 -9 686.00 -56.8 -56.5 -57.0 61 -99 SPO 1997 04 15 20 34 19 6.5 -9 686.00 -56.9 -56.5 -57.0 62 -99 SPO 1997 04 15 20 35 21 6.3 -9 686.00 -56.9 -56.5 -57.0 62 -99 SPO 1997 04 15 20 36 20 6.1 -9 686.00 -56.9 -56.5 -57.0 61 -99 SPO 1997 04 15 20 37 22 6.0 -9 686.00 -56.9 -56.6 -57.0 61 -99 SPO 1997 04 15 20 38 21 6.0 -9 686.00 -56.9 -56.6 -57.1 60 -99 SPO 1997 04 15 20 39 20 5.9 -9 686.10 -57.0 -56.7 -57.1 60 -99 SPO 1997 04 15 20 40 22 6.3 -9 686.00 -57.0 -56.7 -57.2 60 -99 SPO 1997 04 15 20 41 21 6.2 -9 686.00 -57.0 -56.7 -57.2 60 -99 SPO 1997 04 15 20 42 20 6.1 -9 686.00 -57.1 -56.8 -57.2 60 -99 SPO 1997 04 15 20 43 21 6.4 -9 686.00 -57.0 -56.9 -57.2 60 -99 SPO 1997 04 15 20 44 19 6.6 -9 686.00 -57.0 -56.8 -57.3 60 -99 SPO 1997 04 15 20 45 19 7.1 -9 686.00 -57.1 -56.8 -57.3 60 -99 SPO 1997 04 15 20 46 18 7.3 -9 685.90 -57.2 -56.8 -57.3 61 -99 SPO 1997 04 15 20 47 17 7.2 -9 685.90 -57.2 -56.8 -57.3 61 -99 SPO 1997 04 15 20 48 16 7.6 -9 685.90 -57.2 -56.7 -57.3 60 -99 SPO 1997 04 15 20 49 15 7.7 -9 685.90 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 15 20 50 16 7.5 -9 685.90 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 15 20 51 16 7.3 -9 685.90 -57.2 -56.6 -57.3 60 -99 SPO 1997 04 15 20 52 16 7.4 -9 685.90 -57.2 -56.7 -57.4 60 -99 SPO 1997 04 15 20 53 16 7.5 -9 685.90 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 20 54 16 7.7 -9 685.90 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 20 55 16 7.9 -9 685.90 -57.3 -56.6 -57.4 60 -99 SPO 1997 04 15 20 56 15 7.8 -9 685.90 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 20 57 16 7.9 -9 685.90 -57.3 -56.8 -57.4 61 -99 SPO 1997 04 15 20 58 15 8.2 -9 685.90 -57.3 -56.8 -57.4 61 -99 SPO 1997 04 15 20 59 15 8.1 -9 685.90 -57.3 -56.8 -57.4 60 -99 SPO 1997 04 15 21 00 15 8.1 -9 685.80 -57.3 -56.7 -57.4 60 0 SPO 1997 04 15 21 01 15 8.3 -9 685.80 -57.3 -56.8 -57.5 60 -99 SPO 1997 04 15 21 02 15 8.4 -9 685.80 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 21 03 14 8.8 -9 685.80 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 21 04 14 8.8 -9 685.80 -57.3 -56.6 -57.4 60 -99 SPO 1997 04 15 21 05 13 8.5 -9 685.80 -57.3 -56.6 -57.4 60 -99 SPO 1997 04 15 21 06 15 8.6 -9 685.80 -57.3 -56.7 -57.4 60 -99 SPO 1997 04 15 21 07 15 8.4 -9 685.80 -57.3 -56.7 -57.5 60 -99 SPO 1997 04 15 21 08 16 8.2 -9 685.80 -57.3 -56.8 -57.5 60 -99 SPO 1997 04 15 21 09 17 8.0 -9 685.80 -57.4 -56.9 -57.6 60 -99 SPO 1997 04 15 21 10 15 8.0 -9 685.80 -57.4 -57.0 -57.6 60 -99 SPO 1997 04 15 21 11 15 7.7 -9 685.80 -57.4 -57.0 -57.6 59 -99 SPO 1997 04 15 21 12 14 7.8 -9 685.90 -57.5 -57.1 -57.6 59 -99 SPO 1997 04 15 21 13 15 7.9 -9 685.90 -57.5 -57.1 -57.6 59 -99 SPO 1997 04 15 21 14 14 7.8 -9 685.90 -57.5 -57.1 -57.6 58 -99 SPO 1997 04 15 21 15 13 7.6 -9 685.90 -57.5 -57.1 -57.6 59 -99 SPO 1997 04 15 21 16 16 7.8 -9 685.90 -57.5 -57.0 -57.6 59 -99 SPO 1997 04 15 21 17 14 8.0 -9 685.90 -57.6 -57.0 -57.6 60 -99 SPO 1997 04 15 21 18 13 7.9 -9 685.90 -57.5 -57.0 -57.6 59 -99 SPO 1997 04 15 21 19 12 7.7 -9 685.90 -57.5 -57.0 -57.6 61 -99 SPO 1997 04 15 21 20 13 7.7 -9 685.90 -57.5 -56.8 -57.6 61 -99 SPO 1997 04 15 21 21 12 8.1 -9 685.90 -57.5 -56.8 -57.4 59 -99 SPO 1997 04 15 21 22 12 8.0 -9 685.90 -57.4 -56.8 -57.4 59 -99 SPO 1997 04 15 21 23 11 8.4 -9 685.80 -57.4 -56.6 -57.5 59 -99 SPO 1997 04 15 21 24 12 8.4 -9 685.80 -57.4 -56.5 -57.4 59 -99 SPO 1997 04 15 21 25 12 8.4 -9 685.80 -57.3 -56.4 -57.3 60 -99 SPO 1997 04 15 21 26 13 8.1 -9 685.80 -57.3 -56.4 -57.3 60 -99 SPO 1997 04 15 21 27 14 8.2 -9 685.90 -57.2 -56.5 -57.2 60 -99 SPO 1997 04 15 21 28 12 7.8 -9 685.90 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 15 21 29 13 8.0 -9 685.90 -57.2 -56.7 -57.3 60 -99 SPO 1997 04 15 21 30 12 8.0 -9 685.90 -57.2 -56.8 -57.3 61 -99 SPO 1997 04 15 21 31 13 8.2 -9 686.00 -57.2 -56.8 -57.3 60 -99 SPO 1997 04 15 21 32 14 7.9 -9 686.00 -57.2 -56.8 -57.4 60 -99 SPO 1997 04 15 21 33 14 7.8 -9 686.00 -57.3 -56.8 -57.4 60 -99 SPO 1997 04 15 21 34 13 7.7 -9 686.00 -57.3 -56.8 -57.4 60 -99 SPO 1997 04 15 21 35 13 8.0 -9 686.00 -57.3 -56.9 -57.5 60 -99 SPO 1997 04 15 21 36 13 7.9 -9 686.00 -57.3 -56.8 -57.5 60 -99 SPO 1997 04 15 21 37 13 7.8 -9 686.00 -57.4 -56.8 -57.5 60 -99 SPO 1997 04 15 21 38 14 8.0 -9 686.00 -57.4 -56.8 -57.5 60 -99 SPO 1997 04 15 21 39 14 7.8 -9 686.00 -57.4 -56.8 -57.5 61 -99 SPO 1997 04 15 21 40 15 8.0 -9 686.00 -57.4 -56.7 -57.5 61 -99 SPO 1997 04 15 21 41 16 8.1 -9 686.00 -57.4 -56.7 -57.4 62 -99 SPO 1997 04 15 21 42 17 7.9 -9 686.00 -57.4 -56.8 -57.4 62 -99 SPO 1997 04 15 21 43 16 8.0 -9 686.10 -57.4 -56.8 -57.5 61 -99 SPO 1997 04 15 21 44 16 7.9 -9 686.10 -57.4 -56.9 -57.5 60 -99 SPO 1997 04 15 21 45 16 7.8 -9 686.10 -57.4 -56.9 -57.5 60 -99 SPO 1997 04 15 21 46 17 7.7 -9 686.10 -57.4 -56.9 -57.5 60 -99 SPO 1997 04 15 21 47 16 7.7 -9 686.10 -57.4 -57.0 -57.4 60 -99 SPO 1997 04 15 21 48 16 7.8 -9 686.10 -57.4 -57.0 -57.5 60 -99 SPO 1997 04 15 21 49 15 7.7 -9 686.10 -57.4 -57.0 -57.5 60 -99 SPO 1997 04 15 21 50 14 7.8 -9 686.10 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 21 51 15 7.6 -9 686.10 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 21 52 15 7.7 -9 686.10 -57.4 -57.0 -57.5 61 -99 SPO 1997 04 15 21 53 15 7.8 -9 686.10 -57.4 -56.9 -57.5 61 -99 SPO 1997 04 15 21 54 15 7.8 -9 686.10 -57.4 -56.9 -57.5 61 -99 SPO 1997 04 15 21 55 15 8.0 -9 686.10 -57.4 -56.9 -57.5 61 -99 SPO 1997 04 15 21 56 15 8.1 -9 686.20 -57.4 -56.8 -57.5 61 -99 SPO 1997 04 15 21 57 12 7.9 -9 686.20 -57.4 -56.9 -57.4 60 -99 SPO 1997 04 15 21 58 14 7.9 -9 686.20 -57.4 -56.9 -57.5 60 -99 SPO 1997 04 15 21 59 15 7.7 -9 686.20 -57.4 -57.0 -57.5 59 -99 SPO 1997 04 15 22 00 15 7.6 -9 686.20 -57.4 -57.0 -57.5 60 0 SPO 1997 04 15 22 01 15 7.1 -9 686.30 -57.4 -57.1 -57.6 60 -99 SPO 1997 04 15 22 02 16 7.2 -9 686.30 -57.5 -57.1 -57.6 61 -99 SPO 1997 04 15 22 03 17 7.1 -9 686.30 -57.5 -57.2 -57.6 59 -99 SPO 1997 04 15 22 04 19 6.8 -9 686.30 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 22 05 20 6.8 -9 686.30 -57.5 -57.3 -57.6 59 -99 SPO 1997 04 15 22 06 21 6.8 -9 686.30 -57.6 -57.3 -57.7 60 -99 SPO 1997 04 15 22 07 22 6.6 -9 686.30 -57.6 -57.2 -57.7 59 -99 SPO 1997 04 15 22 08 23 6.8 -9 686.40 -57.6 -57.2 -57.6 59 -99 SPO 1997 04 15 22 09 24 6.5 -9 686.40 -57.6 -57.2 -57.6 59 -99 SPO 1997 04 15 22 10 23 6.3 -9 686.40 -57.5 -57.3 -57.6 58 -99 SPO 1997 04 15 22 11 25 6.3 -9 686.40 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 12 25 6.2 -9 686.40 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 13 26 6.0 -9 686.40 -57.6 -57.3 -57.6 59 -99 SPO 1997 04 15 22 14 26 6.3 -9 686.40 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 15 26 6.2 -9 686.40 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 16 26 6.3 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 17 26 6.3 -9 686.50 -57.6 -57.3 -57.7 60 -99 SPO 1997 04 15 22 18 25 6.2 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 19 25 6.3 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 20 25 6.3 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 21 24 6.7 -9 686.50 -57.7 -57.3 -57.7 59 -99 SPO 1997 04 15 22 22 23 7.0 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 23 23 6.8 -9 686.50 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 24 21 7.2 -9 686.40 -57.6 -57.3 -57.7 59 -99 SPO 1997 04 15 22 25 19 7.0 -9 686.40 -57.7 -57.3 -57.7 60 -99 SPO 1997 04 15 22 26 18 7.7 -9 686.40 -57.6 -57.2 -57.7 59 -99 SPO 1997 04 15 22 27 16 7.9 -9 686.40 -57.6 -57.2 -57.7 60 -99 SPO 1997 04 15 22 28 15 8.1 -9 686.40 -57.7 -57.2 -57.7 61 -99 SPO 1997 04 15 22 29 14 8.5 -9 686.40 -57.7 -57.1 -57.7 61 -99 SPO 1997 04 15 22 30 14 8.6 -9 686.30 -57.6 -57.1 -57.6 60 -99 SPO 1997 04 15 22 31 13 8.7 -9 686.30 -57.6 -57.1 -57.6 60 -99 SPO 1997 04 15 22 32 12 8.7 -9 686.30 -57.6 -57.1 -57.6 60 -99 SPO 1997 04 15 22 33 12 8.8 -9 686.30 -57.6 -57.1 -57.6 60 -99 SPO 1997 04 15 22 34 12 9.1 -9 686.30 -57.6 -57.1 -57.6 60 -99 SPO 1997 04 15 22 35 12 9.1 -9 686.30 -57.5 -57.0 -57.5 61 -99 SPO 1997 04 15 22 36 13 9.3 -9 686.30 -57.5 -57.0 -57.5 62 -99 SPO 1997 04 15 22 37 13 9.4 -9 686.30 -57.5 -56.9 -57.4 63 -99 SPO 1997 04 15 22 38 13 9.1 -9 686.30 -57.4 -56.8 -57.4 62 -99 SPO 1997 04 15 22 39 13 9.1 -9 686.20 -57.4 -56.7 -57.4 63 -99 SPO 1997 04 15 22 40 13 9.1 -9 686.20 -57.3 -56.6 -57.3 62 -99 SPO 1997 04 15 22 41 13 9.0 -9 686.30 -57.3 -56.6 -57.3 62 -99 SPO 1997 04 15 22 42 14 9.1 -9 686.30 -57.2 -56.6 -57.2 60 -99 SPO 1997 04 15 22 43 14 9.0 -9 686.30 -57.2 -56.5 -57.2 61 -99 SPO 1997 04 15 22 44 14 8.8 -9 686.30 -57.1 -56.5 -57.1 60 -99 SPO 1997 04 15 22 45 14 8.8 -9 686.30 -57.0 -56.6 -57.0 60 -99 SPO 1997 04 15 22 46 13 8.8 -9 686.30 -57.0 -56.6 -57.0 60 -99 SPO 1997 04 15 22 47 13 8.7 -9 686.30 -57.0 -56.6 -57.0 61 -99 SPO 1997 04 15 22 48 14 9.0 -9 686.30 -56.9 -56.6 -57.0 61 -99 SPO 1997 04 15 22 49 14 9.0 -9 686.30 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 15 22 50 14 8.8 -9 686.30 -56.8 -56.5 -56.8 62 -99 SPO 1997 04 15 22 51 15 8.6 -9 686.30 -56.8 -56.5 -56.9 63 -99 SPO 1997 04 15 22 52 16 8.2 -9 686.40 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 15 22 53 15 8.1 -9 686.40 -56.7 -56.6 -56.8 61 -99 SPO 1997 04 15 22 54 15 8.5 -9 686.40 -56.8 -56.6 -56.9 61 -99 SPO 1997 04 15 22 55 15 8.4 -9 686.40 -56.8 -56.6 -56.9 61 -99 SPO 1997 04 15 22 56 15 8.3 -9 686.40 -56.8 -56.6 -56.9 61 -99 SPO 1997 04 15 22 57 15 8.2 -9 686.40 -56.8 -56.6 -56.8 61 -99 SPO 1997 04 15 22 58 15 8.0 -9 686.40 -56.8 -56.6 -56.9 62 -99 SPO 1997 04 15 22 59 15 8.3 -9 686.40 -56.8 -56.6 -56.9 63 -99 SPO 1997 04 15 23 00 15 8.2 -9 686.40 -56.8 -56.6 -56.8 63 0 SPO 1997 04 15 23 01 16 8.2 -9 686.40 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 15 23 02 17 8.0 -9 686.40 -56.7 -56.5 -56.8 62 -99 SPO 1997 04 15 23 03 17 8.2 -9 686.40 -56.7 -56.6 -56.7 62 -99 SPO 1997 04 15 23 04 17 8.2 -9 686.40 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 23 05 17 8.2 -9 686.40 -56.6 -56.6 -56.7 61 -99 SPO 1997 04 15 23 06 18 8.0 -9 686.50 -56.7 -56.7 -56.8 62 -99 SPO 1997 04 15 23 07 20 8.0 -9 686.50 -56.8 -56.7 -56.8 62 -99 SPO 1997 04 15 23 08 20 7.9 -9 686.50 -56.8 -56.7 -56.9 62 -99 SPO 1997 04 15 23 09 21 7.8 -9 686.40 -56.7 -56.7 -56.9 61 -99 SPO 1997 04 15 23 10 21 7.8 -9 686.50 -56.8 -56.7 -57.0 62 -99 SPO 1997 04 15 23 11 22 8.0 -9 686.50 -56.8 -56.7 -56.9 63 -99 SPO 1997 04 15 23 12 21 7.9 -9 686.50 -56.8 -56.6 -56.9 63 -99 SPO 1997 04 15 23 13 21 7.7 -9 686.50 -56.8 -56.7 -57.0 63 -99 SPO 1997 04 15 23 14 20 8.0 -9 686.50 -56.9 -56.7 -57.0 63 -99 SPO 1997 04 15 23 15 20 7.8 -9 686.50 -56.9 -56.7 -57.0 62 -99 SPO 1997 04 15 23 16 21 8.0 -9 686.50 -56.9 -56.7 -57.0 61 -99 SPO 1997 04 15 23 17 21 7.7 -9 686.50 -56.9 -56.7 -57.1 61 -99 SPO 1997 04 15 23 18 21 8.0 -9 686.50 -56.9 -56.7 -57.1 60 -99 SPO 1997 04 15 23 19 21 8.0 -9 686.50 -56.9 -56.8 -57.0 60 -99 SPO 1997 04 15 23 20 22 8.0 -9 686.50 -57.0 -56.8 -57.1 61 -99 SPO 1997 04 15 23 21 22 8.0 -9 686.50 -57.0 -56.8 -57.1 62 -99 SPO 1997 04 15 23 22 21 7.7 -9 686.50 -57.0 -56.9 -57.2 62 -99 SPO 1997 04 15 23 23 21 7.8 -9 686.50 -57.0 -56.8 -57.2 61 -99 SPO 1997 04 15 23 24 20 8.0 -9 686.50 -57.0 -56.8 -57.2 61 -99 SPO 1997 04 15 23 25 20 7.7 -9 686.50 -57.1 -56.8 -57.1 62 -99 SPO 1997 04 15 23 26 20 7.8 -9 686.50 -57.1 -56.8 -57.1 62 -99 SPO 1997 04 15 23 27 20 7.7 -9 686.50 -57.1 -56.8 -57.2 62 -99 SPO 1997 04 15 23 28 19 7.9 -9 686.60 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 29 20 7.7 -9 686.50 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 30 20 7.7 -9 686.50 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 31 21 7.8 -9 686.50 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 32 21 7.7 -9 686.50 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 33 21 7.5 -9 686.60 -57.1 -56.7 -57.2 62 -99 SPO 1997 04 15 23 34 20 7.9 -9 686.50 -57.1 -56.7 -57.2 62 -99 SPO 1997 04 15 23 35 20 7.7 -9 686.60 -57.1 -56.7 -57.2 61 -99 SPO 1997 04 15 23 36 21 7.8 -9 686.50 -57.1 -56.7 -57.1 62 -99 SPO 1997 04 15 23 37 21 7.6 -9 686.50 -57.1 -56.7 -57.1 61 -99 SPO 1997 04 15 23 38 21 7.6 -9 686.50 -57.0 -56.7 -57.1 60 -99 SPO 1997 04 15 23 39 21 8.1 -9 686.60 -57.0 -56.7 -57.0 60 -99 SPO 1997 04 15 23 40 19 7.9 -9 686.60 -57.0 -56.7 -57.0 60 -99 SPO 1997 04 15 23 41 18 7.8 -9 686.60 -57.0 -56.6 -57.0 60 -99 SPO 1997 04 15 23 42 17 8.3 -9 686.60 -57.0 -56.6 -57.0 60 -99 SPO 1997 04 15 23 43 16 8.0 -9 686.60 -57.0 -56.6 -57.0 61 -99 SPO 1997 04 15 23 44 16 8.2 -9 686.60 -56.9 -56.5 -57.0 61 -99 SPO 1997 04 15 23 45 16 8.2 -9 686.60 -56.9 -56.5 -57.0 61 -99 SPO 1997 04 15 23 46 17 8.2 -9 686.60 -56.9 -56.5 -57.0 62 -99 SPO 1997 04 15 23 47 16 8.1 -9 686.60 -56.9 -56.5 -57.0 62 -99 SPO 1997 04 15 23 48 15 8.3 -9 686.60 -56.9 -56.4 -57.0 62 -99 SPO 1997 04 15 23 49 14 8.5 -9 686.60 -57.0 -56.4 -57.0 62 -99 SPO 1997 04 15 23 50 13 8.6 -9 686.60 -57.0 -56.3 -57.1 62 -99 SPO 1997 04 15 23 51 12 8.8 -9 686.50 -57.0 -56.2 -57.0 61 -99 SPO 1997 04 15 23 52 12 9.1 -9 686.50 -57.0 -56.2 -57.0 61 -99 SPO 1997 04 15 23 53 12 9.1 -9 686.50 -56.9 -56.2 -56.9 60 -99 SPO 1997 04 15 23 54 11 9.1 -9 686.50 -56.8 -56.2 -56.9 59 -99 SPO 1997 04 15 23 55 12 9.1 -9 686.50 -56.9 -56.1 -57.0 61 -99 SPO 1997 04 15 23 56 12 9.2 -9 686.50 -56.8 -56.1 -56.9 60 -99 SPO 1997 04 15 23 57 13 9.4 -9 686.50 -56.8 -55.9 -56.9 61 -99 SPO 1997 04 15 23 58 14 9.1 -9 686.50 -56.8 -55.8 -56.9 -99 -99 SPO 1997 04 15 23 59 14 9.1 -9 686.50 -56.8 -55.7 -56.9 -99 -99 SPO 1997 04 16 00 00 16 9.1 -9 686.50 -56.8 -55.7 -56.8 -99 0 SPO 1997 04 16 00 01 16 9.3 -9 686.50 -56.8 -55.7 -56.8 -99 -99 SPO 1997 04 16 00 02 17 9.3 -9 686.50 -56.8 -55.8 -56.8 -99 -99 SPO 1997 04 16 00 03 17 9.5 -9 686.50 -56.8 -55.8 -56.8 -99 -99 SPO 1997 04 16 00 04 18 9.5 -9 686.50 -56.7 -55.8 -56.8 -99 -99 SPO 1997 04 16 00 05 18 9.6 -9 686.50 -56.7 -55.9 -56.8 -99 -99 SPO 1997 04 16 00 06 18 9.6 -9 686.50 -56.7 -56.0 -56.7 -99 -99 SPO 1997 04 16 00 07 18 9.5 -9 686.50 -56.7 -56.1 -56.8 -99 -99 SPO 1997 04 16 00 08 18 9.4 -9 686.50 -56.7 -56.2 -56.8 -99 -99 SPO 1997 04 16 00 09 18 9.4 -9 686.50 -56.7 -56.3 -56.8 -99 -99 SPO 1997 04 16 00 10 18 9.0 -9 686.50 -56.7 -56.4 -56.9 -99 -99 SPO 1997 04 16 00 11 18 9.4 -9 686.50 -56.8 -56.4 -57.0 -99 -99 SPO 1997 04 16 00 12 19 9.2 -9 686.50 -56.8 -56.5 -57.0 -99 -99 SPO 1997 04 16 00 13 19 9.6 -9 686.50 -56.9 -56.5 -57.1 61 -99 SPO 1997 04 16 00 14 19 9.5 -9 686.50 -57.0 -56.5 -57.1 61 -99 SPO 1997 04 16 00 15 19 9.1 -9 686.50 -57.0 -56.6 -57.2 60 -99 SPO 1997 04 16 00 16 19 9.0 -9 686.50 -57.0 -56.5 -57.2 60 -99 SPO 1997 04 16 00 17 18 9.2 -9 686.50 -57.1 -56.5 -57.2 60 -99 SPO 1997 04 16 00 18 18 9.1 -9 686.60 -57.1 -56.5 -57.2 61 -99 SPO 1997 04 16 00 19 18 9.0 -9 686.60 -57.1 -56.5 -57.2 62 -99 SPO 1997 04 16 00 20 18 9.2 -9 686.60 -57.1 -56.4 -57.1 62 -99 SPO 1997 04 16 00 21 19 9.1 -9 686.60 -57.1 -56.4 -57.1 62 -99 SPO 1997 04 16 00 22 20 9.2 -9 686.60 -57.0 -56.2 -57.1 61 -99 SPO 1997 04 16 00 23 20 9.1 -9 686.60 -57.0 -56.2 -57.0 62 -99 SPO 1997 04 16 00 24 20 9.1 -9 686.60 -57.0 -56.1 -57.0 61 -99 SPO 1997 04 16 00 25 21 9.1 -9 686.70 -57.0 -56.1 -57.0 61 -99 SPO 1997 04 16 00 26 21 9.4 -9 686.70 -56.9 -56.0 -56.9 60 -99 SPO 1997 04 16 00 27 22 9.4 -9 686.70 -56.9 -56.0 -56.8 60 -99 SPO 1997 04 16 00 28 23 9.3 -9 686.70 -56.8 -55.8 -56.8 60 -99 SPO 1997 04 16 00 29 24 9.1 -9 686.70 -56.7 -55.9 -56.7 61 -99 SPO 1997 04 16 00 30 25 9.2 -9 686.70 -56.7 -55.9 -56.7 61 -99 SPO 1997 04 16 00 31 25 8.8 -9 686.70 -56.7 -56.0 -56.8 62 -99 SPO 1997 04 16 00 32 25 8.6 -9 686.70 -56.7 -56.0 -56.9 63 -99 SPO 1997 04 16 00 33 24 8.5 -9 686.70 -56.8 -56.1 -57.0 63 -99 SPO 1997 04 16 00 34 24 8.4 -9 686.80 -56.8 -56.1 -57.0 63 -99 SPO 1997 04 16 00 35 25 8.2 -9 686.80 -56.9 -56.1 -57.0 63 -99 SPO 1997 04 16 00 36 25 8.4 -9 686.80 -56.9 -56.2 -57.0 62 -99 SPO 1997 04 16 00 37 25 8.1 -9 686.80 -56.9 -56.2 -57.0 61 -99 SPO 1997 04 16 00 38 25 8.4 -9 686.80 -56.9 -56.1 -57.0 60 -99 SPO 1997 04 16 00 39 24 8.5 -9 686.80 -56.9 -56.1 -57.0 60 -99 SPO 1997 04 16 00 40 23 8.4 -9 686.80 -56.9 -56.1 -57.0 60 -99 SPO 1997 04 16 00 41 23 8.8 -9 686.80 -56.8 -56.0 -56.8 60 -99 SPO 1997 04 16 00 42 22 9.1 -9 686.80 -56.8 -55.9 -56.8 60 -99 SPO 1997 04 16 00 43 23 9.1 -9 686.80 -56.8 -55.8 -56.7 62 -99 SPO 1997 04 16 00 44 23 9.2 -9 686.80 -56.7 -55.8 -56.7 62 -99 SPO 1997 04 16 00 45 25 9.2 -9 686.80 -56.6 -55.7 -56.6 62 -99 SPO 1997 04 16 00 46 24 9.1 -9 686.80 -56.6 -55.7 -56.6 62 -99 SPO 1997 04 16 00 47 25 9.1 -9 686.80 -56.6 -55.7 -56.5 62 -99 SPO 1997 04 16 00 48 25 9.1 -9 686.80 -56.5 -55.7 -56.5 61 -99 SPO 1997 04 16 00 49 26 8.7 -9 686.80 -56.4 -55.8 -56.4 61 -99 SPO 1997 04 16 00 50 26 9.1 -9 686.80 -56.4 -55.9 -56.5 61 -99 SPO 1997 04 16 00 51 27 8.7 -9 686.80 -56.4 -56.0 -56.6 61 -99 SPO 1997 04 16 00 52 28 8.5 -9 686.80 -56.5 -56.2 -56.7 62 -99 SPO 1997 04 16 00 53 28 8.4 -9 686.80 -56.6 -56.3 -56.8 62 -99 SPO 1997 04 16 00 54 29 8.2 -9 686.80 -56.6 -56.4 -56.9 62 -99 SPO 1997 04 16 00 55 29 7.9 -9 686.80 -56.7 -56.5 -57.0 62 -99 SPO 1997 04 16 00 56 29 7.8 -9 686.80 -56.8 -56.6 -57.0 62 -99 SPO 1997 04 16 00 57 28 7.6 -9 686.80 -56.8 -56.6 -57.0 62 -99 SPO 1997 04 16 00 58 25 7.5 -9 686.90 -56.8 -56.6 -57.0 61 -99 SPO 1997 04 16 00 59 25 7.3 -9 686.90 -56.8 -56.5 -57.0 60 -99 SPO 1997 04 16 01 00 23 7.8 -9 686.90 -56.8 -56.5 -56.9 60 0 SPO 1997 04 16 01 01 24 7.5 -9 686.90 -56.9 -56.4 -56.8 61 -99 SPO 1997 04 16 01 02 23 7.6 -9 686.90 -56.8 -56.3 -56.8 60 -99 SPO 1997 04 16 01 03 23 7.9 -9 686.90 -56.8 -56.3 -56.7 61 -99 SPO 1997 04 16 01 04 22 8.0 -9 686.90 -56.7 -56.2 -56.7 61 -99 SPO 1997 04 16 01 05 21 7.9 -9 686.90 -56.7 -56.2 -56.6 62 -99 SPO 1997 04 16 01 06 20 7.9 -9 686.90 -56.6 -56.1 -56.6 63 -99 SPO 1997 04 16 01 07 19 8.3 -9 686.90 -56.6 -56.1 -56.6 63 -99 SPO 1997 04 16 01 08 18 8.2 -9 686.80 -56.6 -56.1 -56.6 63 -99 SPO 1997 04 16 01 09 17 8.4 -9 686.80 -56.6 -56.1 -56.6 62 -99 SPO 1997 04 16 01 10 16 8.6 -9 686.80 -56.5 -56.0 -56.6 61 -99 SPO 1997 04 16 01 11 16 8.6 -9 686.80 -56.5 -56.0 -56.5 61 -99 SPO 1997 04 16 01 12 16 8.7 -9 686.80 -56.4 -56.0 -56.4 60 -99 SPO 1997 04 16 01 13 16 8.8 -9 686.80 -56.5 -56.0 -56.4 61 -99 SPO 1997 04 16 01 14 16 8.7 -9 686.80 -56.4 -55.9 -56.4 61 -99 SPO 1997 04 16 01 15 15 8.7 -9 686.80 -56.4 -55.9 -56.4 61 -99 SPO 1997 04 16 01 16 14 9.0 -9 686.80 -56.4 -55.9 -56.4 61 -99 SPO 1997 04 16 01 17 15 8.7 -9 686.80 -56.4 -55.8 -56.4 62 -99 SPO 1997 04 16 01 18 14 9.1 -9 686.80 -56.3 -55.8 -56.4 61 -99 SPO 1997 04 16 01 19 14 9.2 -9 686.80 -56.2 -55.6 -56.2 61 -99 SPO 1997 04 16 01 20 14 9.0 -9 686.70 -56.2 -55.5 -56.2 62 -99 SPO 1997 04 16 01 21 14 9.4 -9 686.70 -56.1 -55.4 -56.1 61 -99 SPO 1997 04 16 01 22 16 9.5 -9 686.70 -56.1 -55.4 -56.0 62 -99 SPO 1997 04 16 01 23 17 9.6 -9 686.70 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 16 01 24 16 9.8 -9 686.70 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 16 01 25 16 9.9 -9 686.70 -56.0 -55.4 -56.0 61 -99 SPO 1997 04 16 01 26 16 9.9 -9 686.70 -55.9 -55.4 -56.0 61 -99 SPO 1997 04 16 01 27 15 9.6 -9 686.70 -55.9 -55.4 -55.9 61 -99 SPO 1997 04 16 01 28 15 9.5 -9 686.70 -55.9 -55.4 -56.0 62 -99 SPO 1997 04 16 01 29 16 9.4 -9 686.70 -55.9 -55.5 -56.0 62 -99 SPO 1997 04 16 01 30 15 9.3 -9 686.80 -55.9 -55.6 -56.0 62 -99 SPO 1997 04 16 01 31 15 9.0 -9 686.80 -56.0 -55.6 -56.1 63 -99 SPO 1997 04 16 01 32 15 9.1 -9 686.80 -56.0 -55.7 -56.1 62 -99 SPO 1997 04 16 01 33 14 9.2 -9 686.70 -56.0 -55.7 -56.1 61 -99 SPO 1997 04 16 01 34 14 9.0 -9 686.70 -56.0 -55.7 -56.2 61 -99 SPO 1997 04 16 01 35 13 9.1 -9 686.80 -56.0 -55.7 -56.2 61 -99 SPO 1997 04 16 01 36 13 8.9 -9 686.80 -56.0 -55.7 -56.1 60 -99 SPO 1997 04 16 01 37 13 8.8 -9 686.80 -56.0 -55.7 -56.2 60 -99 SPO 1997 04 16 01 38 13 9.1 -9 686.70 -56.1 -55.7 -56.2 61 -99 SPO 1997 04 16 01 39 13 9.3 -9 686.70 -56.1 -55.6 -56.2 61 -99 SPO 1997 04 16 01 40 13 9.1 -9 686.80 -56.1 -55.5 -56.1 61 -99 SPO 1997 04 16 01 41 13 8.9 -9 686.80 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 16 01 42 13 8.8 -9 686.80 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 16 01 43 14 8.9 -9 686.80 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 16 01 44 14 8.8 -9 686.80 -56.1 -55.5 -56.1 62 -99 SPO 1997 04 16 01 45 13 8.8 -9 686.80 -56.0 -55.5 -56.1 61 -99 SPO 1997 04 16 01 46 14 8.8 -9 686.80 -56.0 -55.3 -56.0 61 -99 SPO 1997 04 16 01 47 15 8.6 -9 686.80 -56.0 -55.3 -55.9 61 -99 SPO 1997 04 16 01 48 16 9.1 -9 686.80 -55.9 -55.2 -55.8 61 -99 SPO 1997 04 16 01 49 17 8.7 -9 686.80 -55.9 -55.3 -55.8 62 -99 SPO 1997 04 16 01 50 17 8.8 -9 686.80 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 16 01 51 18 8.5 -9 686.80 -55.8 -55.3 -55.8 63 -99 SPO 1997 04 16 01 52 18 8.8 -9 686.80 -55.8 -55.3 -55.8 63 -99 SPO 1997 04 16 01 53 19 9.3 -9 686.80 -55.7 -55.4 -55.8 62 -99 SPO 1997 04 16 01 54 18 9.1 -9 686.80 -55.7 -55.3 -55.8 63 -99 SPO 1997 04 16 01 55 19 8.9 -9 686.90 -55.7 -55.3 -55.8 63 -99 SPO 1997 04 16 01 56 20 9.1 -9 686.90 -55.7 -55.2 -55.8 62 -99 SPO 1997 04 16 01 57 20 8.3 -9 686.90 -55.7 -55.2 -55.7 62 -99 SPO 1997 04 16 01 58 20 8.8 -9 686.90 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 16 01 59 19 8.8 -9 686.90 -55.6 -55.4 -55.7 61 -99 SPO 1997 04 16 02 00 18 8.6 -9 686.90 -55.7 -55.4 -55.8 61 0 SPO 1997 04 16 02 01 19 8.5 -9 686.90 -55.7 -55.4 -55.8 61 -99 SPO 1997 04 16 02 02 18 9.0 -9 686.90 -55.6 -55.4 -55.7 61 -99 SPO 1997 04 16 02 03 18 8.9 -9 686.90 -55.6 -55.4 -55.7 62 -99 SPO 1997 04 16 02 04 17 8.6 -9 686.90 -55.7 -55.5 -55.8 63 -99 SPO 1997 04 16 02 05 17 8.8 -9 686.90 -55.7 -55.5 -55.8 63 -99 SPO 1997 04 16 02 06 17 8.5 -9 687.00 -55.7 -55.5 -55.8 63 -99 SPO 1997 04 16 02 07 17 8.9 -9 687.00 -55.7 -55.4 -55.9 62 -99 SPO 1997 04 16 02 08 18 8.8 -9 687.00 -55.8 -55.4 -55.8 62 -99 SPO 1997 04 16 02 09 18 8.5 -9 687.00 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 16 02 10 18 8.9 -9 686.90 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 16 02 11 21 8.7 -9 686.90 -55.7 -55.2 -55.8 61 -99 SPO 1997 04 16 02 12 22 8.9 -9 686.90 -55.7 -55.2 -55.7 61 -99 SPO 1997 04 16 02 13 22 9.2 -9 686.90 -55.6 -55.2 -55.6 62 -99 SPO 1997 04 16 02 14 22 9.3 -9 686.90 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 16 02 15 20 9.2 -9 686.90 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 16 02 16 19 9.0 -9 686.90 -55.6 -55.3 -55.7 63 -99 SPO 1997 04 16 02 17 19 8.7 -9 686.90 -55.7 -55.3 -55.8 64 -99 SPO 1997 04 16 02 18 20 8.8 -9 686.90 -55.7 -55.4 -55.8 64 -99 SPO 1997 04 16 02 19 19 9.0 -9 686.90 -55.7 -55.4 -55.8 63 -99 SPO 1997 04 16 02 20 17 9.1 -9 686.90 -55.8 -55.4 -55.8 63 -99 SPO 1997 04 16 02 21 18 8.8 -9 686.90 -55.7 -55.4 -55.8 62 -99 SPO 1997 04 16 02 22 19 9.0 -9 686.90 -55.8 -55.4 -55.9 62 -99 SPO 1997 04 16 02 23 20 8.8 -9 686.90 -55.8 -55.4 -55.9 62 -99 SPO 1997 04 16 02 24 20 8.3 -9 686.90 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 25 19 8.8 -9 686.90 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 26 19 8.5 -9 686.90 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 16 02 27 19 8.8 -9 686.90 -55.8 -55.3 -55.9 62 -99 SPO 1997 04 16 02 28 20 8.7 -9 686.90 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 16 02 29 20 8.6 -9 686.90 -55.7 -55.3 -55.8 62 -99 SPO 1997 04 16 02 30 21 8.4 -9 686.90 -55.7 -55.3 -55.8 61 -99 SPO 1997 04 16 02 31 20 8.4 -9 686.90 -55.7 -55.4 -55.8 61 -99 SPO 1997 04 16 02 32 19 8.7 -9 686.90 -55.7 -55.4 -55.8 61 -99 SPO 1997 04 16 02 33 19 8.9 -9 686.90 -55.7 -55.3 -55.7 61 -99 SPO 1997 04 16 02 34 19 9.0 -9 686.90 -55.7 -55.3 -55.6 62 -99 SPO 1997 04 16 02 35 20 9.0 -9 686.90 -55.6 -55.4 -55.7 62 -99 SPO 1997 04 16 02 36 21 9.1 -9 686.90 -55.7 -55.4 -55.8 62 -99 SPO 1997 04 16 02 37 20 9.2 -9 686.80 -55.7 -55.4 -55.8 63 -99 SPO 1997 04 16 02 38 19 9.3 -9 686.80 -55.7 -55.4 -55.7 63 -99 SPO 1997 04 16 02 39 20 9.2 -9 686.80 -55.7 -55.4 -55.8 63 -99 SPO 1997 04 16 02 40 20 9.2 -9 686.80 -55.7 -55.5 -55.9 63 -99 SPO 1997 04 16 02 41 19 9.3 -9 686.80 -55.7 -55.5 -56.0 61 -99 SPO 1997 04 16 02 42 20 9.4 -9 686.80 -55.7 -55.5 -56.0 61 -99 SPO 1997 04 16 02 43 19 9.2 -9 686.80 -55.8 -55.5 -55.9 61 -99 SPO 1997 04 16 02 44 19 9.1 -9 686.80 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 45 18 9.1 -9 686.80 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 46 19 9.3 -9 686.80 -55.8 -55.3 -55.8 61 -99 SPO 1997 04 16 02 47 19 9.5 -9 686.80 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 48 18 9.1 -9 686.80 -55.8 -55.4 -55.9 61 -99 SPO 1997 04 16 02 49 18 9.1 -9 686.80 -55.8 -55.4 -55.9 62 -99 SPO 1997 04 16 02 50 16 9.6 -9 686.80 -55.8 -55.4 -55.8 63 -99 SPO 1997 04 16 02 51 17 9.3 -9 686.80 -55.8 -55.6 -55.9 63 -99 SPO 1997 04 16 02 52 17 9.2 -9 686.80 -55.8 -55.6 -56.0 63 -99 SPO 1997 04 16 02 53 17 9.6 -9 686.80 -55.9 -55.7 -56.1 63 -99 SPO 1997 04 16 02 54 17 9.3 -9 686.80 -55.9 -55.7 -56.0 62 -99 SPO 1997 04 16 02 55 17 9.3 -9 686.80 -56.0 -55.6 -56.1 63 -99 SPO 1997 04 16 02 56 16 9.1 -9 686.80 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 16 02 57 16 9.2 -9 686.80 -55.9 -55.6 -56.1 61 -99 SPO 1997 04 16 02 58 16 9.0 -9 686.80 -55.9 -55.5 -56.1 61 -99 SPO 1997 04 16 02 59 17 9.4 -9 686.80 -55.9 -55.5 -56.0 61 -99 SPO 1997 04 16 03 00 18 9.1 -9 686.80 -55.9 -55.5 -56.0 61 0 SPO 1997 04 16 03 01 17 9.7 -9 686.70 -55.9 -55.5 -56.0 62 -99 SPO 1997 04 16 03 02 17 10.0 -9 686.70 -55.9 -55.4 -55.9 62 -99 SPO 1997 04 16 03 03 16 9.7 -9 686.70 -55.9 -55.4 -55.9 63 -99 SPO 1997 04 16 03 04 16 9.9 -9 686.70 -55.8 -55.5 -55.9 62 -99 SPO 1997 04 16 03 05 16 9.7 -9 686.70 -55.9 -55.6 -56.0 63 -99 SPO 1997 04 16 03 06 15 9.7 -9 686.70 -55.9 -55.6 -56.0 62 -99 SPO 1997 04 16 03 07 15 10.1 -9 686.70 -55.9 -55.7 -56.0 62 -99 SPO 1997 04 16 03 08 15 9.9 -9 686.70 -56.0 -55.7 -56.1 62 -99 SPO 1997 04 16 03 09 14 9.9 -9 686.70 -56.0 -55.6 -56.0 62 -99 SPO 1997 04 16 03 10 14 9.9 -9 686.70 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 16 03 11 14 9.7 -9 686.70 -56.0 -55.6 -56.2 62 -99 SPO 1997 04 16 03 12 13 10.5 -9 686.70 -56.0 -55.6 -56.0 63 -99 SPO 1997 04 16 03 13 13 10.1 -9 686.70 -56.0 -55.6 -56.0 63 -99 SPO 1997 04 16 03 14 13 10.1 -9 686.70 -55.9 -55.6 -56.1 63 -99 SPO 1997 04 16 03 15 13 10.6 -9 686.70 -56.0 -55.5 -56.0 64 -99 SPO 1997 04 16 03 16 14 10.3 -9 686.70 -55.9 -55.6 -56.0 63 -99 SPO 1997 04 16 03 17 13 10.6 -9 686.70 -55.9 -55.5 -56.0 63 -99 SPO 1997 04 16 03 18 12 10.7 -9 686.70 -55.9 -55.5 -56.0 62 -99 SPO 1997 04 16 03 19 12 10.4 -9 686.70 -55.9 -55.5 -56.0 62 -99 SPO 1997 04 16 03 20 12 10.4 -9 686.70 -55.9 -55.6 -56.1 61 -99 SPO 1997 04 16 03 21 13 10.4 -9 686.70 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 16 03 22 13 10.8 -9 686.70 -56.0 -55.6 -56.0 63 -99 SPO 1997 04 16 03 23 13 10.6 -9 686.70 -56.0 -55.6 -56.1 64 -99 SPO 1997 04 16 03 24 14 10.7 -9 686.70 -56.0 -55.6 -56.1 64 -99 SPO 1997 04 16 03 25 14 10.7 -9 686.70 -56.0 -55.6 -56.0 64 -99 SPO 1997 04 16 03 26 14 10.5 -9 686.70 -56.0 -55.6 -56.0 64 -99 SPO 1997 04 16 03 27 14 10.8 -9 686.70 -56.0 -55.6 -56.1 64 -99 SPO 1997 04 16 03 28 14 10.9 -9 686.60 -56.0 -55.6 -56.1 64 -99 SPO 1997 04 16 03 29 14 11.2 -9 686.60 -56.0 -55.5 -56.0 63 -99 SPO 1997 04 16 03 30 14 10.8 -9 686.60 -55.9 -55.6 -56.1 61 -99 SPO 1997 04 16 03 31 14 10.9 -9 686.60 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 16 03 32 14 11.0 -9 686.60 -56.0 -55.6 -56.1 61 -99 SPO 1997 04 16 03 33 13 10.9 -9 686.70 -56.0 -55.6 -56.1 62 -99 SPO 1997 04 16 03 34 13 10.9 -9 686.60 -56.0 -55.5 -56.1 62 -99 SPO 1997 04 16 03 35 13 10.8 -9 686.60 -56.0 -55.5 -56.1 62 -99 SPO 1997 04 16 03 36 13 11.0 -9 686.60 -56.0 -55.5 -56.1 62 -99 SPO 1997 04 16 03 37 14 11.1 -9 686.60 -56.0 -55.6 -56.1 63 -99 SPO 1997 04 16 03 38 14 11.1 -9 686.60 -56.0 -55.6 -56.1 64 -99 SPO 1997 04 16 03 39 13 11.2 -9 686.60 -56.0 -55.6 -56.0 64 -99 SPO 1997 04 16 03 40 13 11.3 -9 686.60 -56.0 -55.5 -56.0 64 -99 SPO 1997 04 16 03 41 14 10.9 -9 686.60 -56.0 -55.5 -56.0 64 -99 SPO 1997 04 16 03 42 14 11.0 -9 686.60 -56.0 -55.5 -56.1 64 -99 SPO 1997 04 16 03 43 14 11.0 -9 686.60 -56.0 -55.5 -56.1 63 -99 SPO 1997 04 16 03 44 14 11.0 -9 686.60 -56.0 -55.5 -56.1 63 -99 SPO 1997 04 16 03 45 14 10.7 -9 686.60 -56.0 -55.5 -56.1 63 -99 SPO 1997 04 16 03 46 15 10.6 -9 686.60 -55.9 -55.6 -56.2 62 -99 SPO 1997 04 16 03 47 14 10.5 -9 686.60 -56.0 -55.5 -56.2 63 -99 SPO 1997 04 16 03 48 14 10.6 -9 686.60 -56.0 -55.5 -56.2 64 -99 SPO 1997 04 16 03 49 13 11.0 -9 686.60 -56.0 -55.4 -56.0 64 -99 SPO 1997 04 16 03 50 12 11.1 -9 686.60 -56.0 -55.3 -56.0 64 -99 SPO 1997 04 16 03 51 12 11.2 -9 686.50 -55.9 -55.3 -55.9 63 -99 SPO 1997 04 16 03 52 12 11.3 -9 686.50 -55.9 -55.3 -55.8 63 -99 SPO 1997 04 16 03 53 12 11.3 -9 686.50 -55.8 -55.3 -55.9 62 -99 SPO 1997 04 16 03 54 12 11.1 -9 686.50 -55.9 -55.3 -55.9 63 -99 SPO 1997 04 16 03 55 13 11.2 -9 686.50 -55.8 -55.2 -55.9 62 -99 SPO 1997 04 16 03 56 13 11.0 -9 686.60 -55.8 -55.2 -55.8 62 -99 SPO 1997 04 16 03 57 13 11.2 -9 686.50 -55.8 -55.2 -55.8 62 -99 SPO 1997 04 16 03 58 13 11.1 -9 686.50 -55.8 -55.2 -55.8 63 -99 SPO 1997 04 16 03 59 13 11.4 -9 686.50 -55.8 -55.2 -55.8 63 -99 SPO 1997 04 16 04 00 13 11.2 -9 686.50 -55.7 -55.1 -55.7 63 0 SPO 1997 04 16 04 01 13 11.4 -9 686.50 -55.7 -55.1 -55.7 63 -99 SPO 1997 04 16 04 02 14 11.1 -9 686.50 -55.7 -55.0 -55.6 64 -99 SPO 1997 04 16 04 03 14 11.4 -9 686.50 -55.6 -55.1 -55.6 63 -99 SPO 1997 04 16 04 04 14 11.8 -9 686.50 -55.5 -55.1 -55.6 62 -99 SPO 1997 04 16 04 05 13 11.3 -9 686.50 -55.5 -55.0 -55.6 62 -99 SPO 1997 04 16 04 06 13 11.1 -9 686.50 -55.5 -55.0 -55.6 62 -99 SPO 1997 04 16 04 07 13 11.3 -9 686.50 -55.5 -54.9 -55.5 62 -99 SPO 1997 04 16 04 08 13 11.3 -9 686.50 -55.4 -54.9 -55.4 61 -99 SPO 1997 04 16 04 09 12 11.2 -9 686.50 -55.4 -55.0 -55.4 62 -99 SPO 1997 04 16 04 10 13 10.8 -9 686.50 -55.4 -55.0 -55.5 62 -99 SPO 1997 04 16 04 11 12 10.7 -9 686.50 -55.4 -55.0 -55.5 62 -99 SPO 1997 04 16 04 12 13 10.9 -9 686.60 -55.4 -55.1 -55.5 62 -99 SPO 1997 04 16 04 13 13 10.7 -9 686.60 -55.4 -55.2 -55.6 63 -99 SPO 1997 04 16 04 14 12 10.9 -9 686.60 -55.4 -55.2 -55.6 63 -99 SPO 1997 04 16 04 15 12 10.9 -9 686.60 -55.4 -55.1 -55.5 62 -99 SPO 1997 04 16 04 16 12 10.7 -9 686.60 -55.4 -55.1 -55.5 62 -99 SPO 1997 04 16 04 17 12 11.0 -9 686.60 -55.4 -55.1 -55.5 62 -99 SPO 1997 04 16 04 18 12 10.9 -9 686.60 -55.4 -55.2 -55.6 62 -99 SPO 1997 04 16 04 19 13 10.7 -9 686.70 -55.5 -55.2 -55.6 63 -99 SPO 1997 04 16 04 20 13 10.1 -9 686.70 -55.4 -55.2 -55.7 62 -99 SPO 1997 04 16 04 21 12 10.9 -9 686.70 -55.5 -55.1 -55.6 63 -99 SPO 1997 04 16 04 22 12 11.2 -9 686.70 -55.4 -54.8 -55.3 62 -99 SPO 1997 04 16 04 23 12 10.9 -9 686.70 -55.3 -54.7 -55.1 62 -99 SPO 1997 04 16 04 24 13 10.7 -9 686.70 -55.2 -54.7 -55.2 62 -99 SPO 1997 04 16 04 25 12 11.0 -9 686.70 -55.2 -54.7 -55.2 64 -99 SPO 1997 04 16 04 26 12 11.1 -9 686.70 -55.2 -54.7 -55.2 64 -99 SPO 1997 04 16 04 27 12 10.7 -9 686.70 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 16 04 28 13 11.0 -9 686.70 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 16 04 29 14 10.6 -9 686.80 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 16 04 30 12 10.1 -9 686.80 -55.1 -54.7 -55.2 62 -99 SPO 1997 04 16 04 31 13 10.4 -9 686.80 -55.1 -54.5 -55.1 62 -99 SPO 1997 04 16 04 32 14 10.2 -9 686.80 -55.1 -54.5 -55.1 63 -99 SPO 1997 04 16 04 33 14 10.2 -9 686.80 -55.0 -54.5 -55.0 63 -99 SPO 1997 04 16 04 34 15 9.8 -9 686.80 -55.0 -54.5 -55.0 64 -99 SPO 1997 04 16 04 35 16 9.9 -9 686.80 -55.0 -54.6 -55.1 65 -99 SPO 1997 04 16 04 36 16 10.4 -9 686.80 -55.0 -54.6 -55.1 65 -99 SPO 1997 04 16 04 37 16 10.2 -9 686.80 -55.0 -54.6 -55.1 65 -99 SPO 1997 04 16 04 38 15 10.0 -9 686.80 -55.0 -54.5 -55.2 64 -99 SPO 1997 04 16 04 39 15 10.6 -9 686.80 -55.0 -54.4 -55.0 64 -99 SPO 1997 04 16 04 40 14 10.4 -9 686.80 -55.0 -54.2 -55.0 63 -99 SPO 1997 04 16 04 41 14 10.9 -9 686.80 -54.9 -54.2 -54.8 62 -99 SPO 1997 04 16 04 42 15 10.8 -9 686.70 -54.8 -54.2 -54.8 62 -99 SPO 1997 04 16 04 43 15 10.8 -9 686.70 -54.8 -54.2 -54.8 63 -99 SPO 1997 04 16 04 44 16 11.0 -9 686.70 -54.8 -54.3 -54.8 64 -99 SPO 1997 04 16 04 45 16 11.3 -9 686.80 -54.8 -54.4 -54.9 64 -99 SPO 1997 04 16 04 46 16 10.9 -9 686.80 -54.8 -54.6 -55.0 64 -99 SPO 1997 04 16 04 47 16 10.4 -9 686.70 -54.9 -54.6 -55.1 65 -99 SPO 1997 04 16 04 48 16 10.5 -9 686.80 -54.9 -54.6 -55.2 65 -99 SPO 1997 04 16 04 49 17 10.5 -9 686.80 -55.0 -54.6 -55.2 64 -99 SPO 1997 04 16 04 50 17 10.3 -9 686.80 -55.0 -54.6 -55.2 64 -99 SPO 1997 04 16 04 51 16 10.1 -9 686.80 -55.1 -54.5 -55.2 64 -99 SPO 1997 04 16 04 52 15 10.3 -9 686.80 -55.1 -54.6 -55.2 64 -99 SPO 1997 04 16 04 53 15 10.6 -9 686.80 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 16 04 54 15 10.2 -9 686.80 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 16 04 55 15 10.1 -9 686.80 -55.0 -54.6 -55.2 63 -99 SPO 1997 04 16 04 56 16 10.2 -9 686.80 -55.0 -54.6 -55.1 62 -99 SPO 1997 04 16 04 57 15 10.3 -9 686.80 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 16 04 58 15 10.7 -9 686.80 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 16 04 59 16 10.3 -9 686.80 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 16 05 00 16 10.1 -9 686.80 -55.0 -54.8 -55.0 64 0 SPO 1997 04 16 05 01 16 10.2 -9 686.80 -55.0 -54.8 -55.1 64 -99 SPO 1997 04 16 05 02 15 10.4 -9 686.80 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 16 05 03 15 10.6 -9 686.80 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 16 05 04 15 10.6 -9 686.80 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 16 05 05 15 10.0 -9 686.80 -54.9 -54.6 -54.9 62 -99 SPO 1997 04 16 05 06 16 10.3 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 07 17 10.3 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 08 17 10.6 -9 686.80 -54.8 -54.6 -54.9 63 -99 SPO 1997 04 16 05 09 15 10.4 -9 686.80 -54.8 -54.6 -55.0 63 -99 SPO 1997 04 16 05 10 15 10.3 -9 686.80 -54.8 -54.6 -55.0 63 -99 SPO 1997 04 16 05 11 15 10.9 -9 686.80 -54.9 -54.6 -55.0 64 -99 SPO 1997 04 16 05 12 15 10.7 -9 686.80 -54.8 -54.6 -54.9 63 -99 SPO 1997 04 16 05 13 15 10.5 -9 686.80 -54.8 -54.5 -54.9 63 -99 SPO 1997 04 16 05 14 15 10.7 -9 686.80 -54.8 -54.6 -54.8 62 -99 SPO 1997 04 16 05 15 15 10.8 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 16 15 10.4 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 17 15 10.6 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 18 15 10.5 -9 686.80 -54.8 -54.6 -54.9 62 -99 SPO 1997 04 16 05 19 15 10.8 -9 686.80 -54.8 -54.6 -54.8 63 -99 SPO 1997 04 16 05 20 15 10.4 -9 686.80 -54.8 -54.5 -54.8 64 -99 SPO 1997 04 16 05 21 15 10.5 -9 686.80 -54.7 -54.5 -54.8 63 -99 SPO 1997 04 16 05 22 15 10.9 -9 686.80 -54.7 -54.4 -54.7 64 -99 SPO 1997 04 16 05 23 14 11.1 -9 686.80 -54.7 -54.4 -54.7 65 -99 SPO 1997 04 16 05 24 13 10.9 -9 686.80 -54.6 -54.4 -54.6 64 -99 SPO 1997 04 16 05 25 13 10.9 -9 686.80 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 16 05 26 14 11.4 -9 686.80 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 16 05 27 15 10.8 -9 686.80 -54.7 -54.5 -54.8 64 -99 SPO 1997 04 16 05 28 16 10.9 -9 686.80 -54.7 -54.5 -54.8 63 -99 SPO 1997 04 16 05 29 16 10.5 -9 686.80 -54.7 -54.6 -54.9 62 -99 SPO 1997 04 16 05 30 16 10.5 -9 686.80 -54.7 -54.6 -54.9 62 -99 SPO 1997 04 16 05 31 16 10.2 -9 686.80 -54.7 -54.6 -54.8 62 -99 SPO 1997 04 16 05 32 14 10.9 -9 686.80 -54.7 -54.6 -54.8 63 -99 SPO 1997 04 16 05 33 15 10.5 -9 686.80 -54.7 -54.6 -54.7 63 -99 SPO 1997 04 16 05 34 14 10.6 -9 686.80 -54.7 -54.5 -54.7 64 -99 SPO 1997 04 16 05 35 13 10.8 -9 686.80 -54.6 -54.4 -54.6 63 -99 SPO 1997 04 16 05 36 13 10.3 -9 686.80 -54.6 -54.4 -54.6 63 -99 SPO 1997 04 16 05 37 15 10.6 -9 686.80 -54.6 -54.5 -54.6 63 -99 SPO 1997 04 16 05 38 15 10.6 -9 686.80 -54.6 -54.5 -54.7 63 -99 SPO 1997 04 16 05 39 13 10.3 -9 686.80 -54.6 -54.5 -54.8 63 -99 SPO 1997 04 16 05 40 15 11.0 -9 686.80 -54.6 -54.4 -54.8 63 -99 SPO 1997 04 16 05 41 15 10.7 -9 686.80 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 16 05 42 15 10.9 -9 686.80 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 16 05 43 15 10.6 -9 686.80 -54.6 -54.5 -54.7 63 -99 SPO 1997 04 16 05 44 14 10.9 -9 686.80 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 16 05 45 15 10.8 -9 686.80 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 16 05 46 14 10.5 -9 686.80 -54.6 -54.5 -54.8 64 -99 SPO 1997 04 16 05 47 13 10.6 -9 686.80 -54.6 -54.6 -54.8 64 -99 SPO 1997 04 16 05 48 15 10.5 -9 686.80 -54.7 -54.6 -54.8 64 -99 SPO 1997 04 16 05 49 15 10.6 -9 686.80 -54.7 -54.6 -54.8 64 -99 SPO 1997 04 16 05 50 15 10.4 -9 686.80 -54.7 -54.6 -54.8 63 -99 SPO 1997 04 16 05 51 15 10.5 -9 686.80 -54.7 -54.6 -54.8 62 -99 SPO 1997 04 16 05 52 15 10.8 -9 686.80 -54.7 -54.6 -54.8 62 -99 SPO 1997 04 16 05 53 14 10.8 -9 686.80 -54.7 -54.6 -54.7 62 -99 SPO 1997 04 16 05 54 13 10.2 -9 686.80 -54.7 -54.6 -54.8 62 -99 SPO 1997 04 16 05 55 14 10.6 -9 686.80 -54.7 -54.6 -54.8 63 -99 SPO 1997 04 16 05 56 14 10.9 -9 686.80 -54.7 -54.5 -54.8 64 -99 SPO 1997 04 16 05 57 14 10.3 -9 686.80 -54.6 -54.5 -54.8 64 -99 SPO 1997 04 16 05 58 13 10.6 -9 686.80 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 16 05 59 13 10.7 -9 686.80 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 16 06 00 13 10.6 -9 686.80 -54.6 -54.4 -54.6 64 0 SPO 1997 04 16 06 01 13 10.2 -9 686.80 -54.6 -54.4 -54.6 64 -99 SPO 1997 04 16 06 02 13 10.8 -9 686.80 -54.6 -54.3 -54.6 64 -99 SPO 1997 04 16 06 03 13 10.8 -9 686.80 -54.5 -54.3 -54.5 63 -99 SPO 1997 04 16 06 04 13 11.0 -9 686.80 -54.5 -54.3 -54.5 63 -99 SPO 1997 04 16 06 05 14 10.7 -9 686.80 -54.4 -54.3 -54.5 63 -99 SPO 1997 04 16 06 06 14 10.8 -9 686.80 -54.4 -54.3 -54.4 63 -99 SPO 1997 04 16 06 07 14 11.1 -9 686.80 -54.4 -54.2 -54.4 64 -99 SPO 1997 04 16 06 08 14 11.1 -9 686.80 -54.3 -54.1 -54.3 65 -99 SPO 1997 04 16 06 09 14 10.8 -9 686.80 -54.3 -54.0 -54.2 66 -99 SPO 1997 04 16 06 10 15 10.3 -9 686.90 -54.2 -54.0 -54.2 66 -99 SPO 1997 04 16 06 11 16 10.5 -9 686.90 -54.2 -54.0 -54.2 66 -99 SPO 1997 04 16 06 12 16 10.6 -9 686.90 -54.1 -53.9 -54.1 65 -99 SPO 1997 04 16 06 13 16 10.7 -9 686.90 -54.1 -53.8 -54.1 65 -99 SPO 1997 04 16 06 14 16 10.5 -9 686.90 -54.0 -53.8 -54.0 64 -99 SPO 1997 04 16 06 15 17 10.3 -9 687.00 -54.0 -53.6 -53.9 64 -99 SPO 1997 04 16 06 16 17 10.2 -9 687.00 -53.9 -53.6 -53.8 64 -99 SPO 1997 04 16 06 17 17 10.4 -9 687.00 -53.9 -53.5 -53.8 64 -99 SPO 1997 04 16 06 18 17 10.1 -9 687.00 -53.8 -53.5 -53.7 64 -99 SPO 1997 04 16 06 19 17 11.1 -9 687.00 -53.7 -53.5 -53.6 64 -99 SPO 1997 04 16 06 20 16 10.3 -9 687.00 -53.7 -53.5 -53.6 66 -99 SPO 1997 04 16 06 21 16 10.6 -9 687.00 -53.7 -53.5 -53.7 67 -99 SPO 1997 04 16 06 22 16 10.6 -9 687.00 -53.6 -53.5 -53.6 67 -99 SPO 1997 04 16 06 23 16 10.6 -9 687.00 -53.6 -53.5 -53.6 66 -99 SPO 1997 04 16 06 24 18 10.4 -9 687.00 -53.6 -53.5 -53.6 66 -99 SPO 1997 04 16 06 25 17 10.2 -9 687.10 -53.6 -53.5 -53.6 66 -99 SPO 1997 04 16 06 26 16 10.3 -9 687.10 -53.6 -53.5 -53.7 66 -99 SPO 1997 04 16 06 27 16 10.6 -9 687.00 -53.6 -53.5 -53.7 66 -99 SPO 1997 04 16 06 28 16 10.8 -9 687.00 -53.6 -53.5 -53.6 65 -99 SPO 1997 04 16 06 29 16 10.3 -9 687.00 -53.6 -53.5 -53.6 66 -99 SPO 1997 04 16 06 30 15 10.5 -9 687.00 -53.6 -53.4 -53.6 66 -99 SPO 1997 04 16 06 31 16 10.3 -9 687.10 -53.5 -53.4 -53.6 66 -99 SPO 1997 04 16 06 32 15 10.4 -9 687.00 -53.5 -53.4 -53.6 67 -99 SPO 1997 04 16 06 33 15 9.6 -9 687.00 -53.5 -53.4 -53.6 67 -99 SPO 1997 04 16 06 34 16 10.7 -9 687.00 -53.5 -53.3 -53.6 67 -99 SPO 1997 04 16 06 35 16 11.0 -9 687.00 -53.5 -53.3 -53.5 66 -99 SPO 1997 04 16 06 36 16 11.3 -9 687.00 -53.4 -53.4 -53.5 64 -99 SPO 1997 04 16 06 37 15 11.5 -9 686.90 -53.5 -53.4 -53.6 65 -99 SPO 1997 04 16 06 38 15 11.0 -9 686.90 -53.5 -53.5 -53.6 64 -99 SPO 1997 04 16 06 39 15 10.7 -9 686.90 -53.5 -53.5 -53.7 64 -99 SPO 1997 04 16 06 40 15 10.6 -9 687.00 -53.5 -53.6 -53.7 64 -99 SPO 1997 04 16 06 41 15 10.6 -9 686.90 -53.6 -53.6 -53.7 65 -99 SPO 1997 04 16 06 42 16 10.4 -9 686.90 -53.6 -53.5 -53.7 65 -99 SPO 1997 04 16 06 43 15 10.9 -9 686.90 -53.5 -53.5 -53.6 65 -99 SPO 1997 04 16 06 44 15 10.6 -9 686.90 -53.5 -53.5 -53.6 66 -99 SPO 1997 04 16 06 45 15 10.5 -9 687.00 -53.5 -53.5 -53.7 66 -99 SPO 1997 04 16 06 46 15 10.7 -9 687.00 -53.6 -53.5 -53.7 66 -99 SPO 1997 04 16 06 47 15 10.5 -9 687.00 -53.6 -53.5 -53.7 66 -99 SPO 1997 04 16 06 48 15 10.4 -9 687.00 -53.6 -53.5 -53.7 65 -99 SPO 1997 04 16 06 49 16 10.3 -9 687.00 -53.6 -53.5 -53.7 65 -99 SPO 1997 04 16 06 50 15 10.3 -9 687.00 -53.6 -53.4 -53.6 65 -99 SPO 1997 04 16 06 51 14 10.5 -9 687.00 -53.5 -53.4 -53.6 64 -99 SPO 1997 04 16 06 52 14 10.5 -9 687.00 -53.5 -53.4 -53.6 64 -99 SPO 1997 04 16 06 53 14 11.0 -9 687.00 -53.5 -53.5 -53.6 65 -99 SPO 1997 04 16 06 54 14 10.5 -9 687.10 -53.6 -53.6 -53.7 67 -99 SPO 1997 04 16 06 55 14 10.7 -9 687.00 -53.6 -53.6 -53.7 66 -99 SPO 1997 04 16 06 56 14 10.3 -9 687.10 -53.6 -53.6 -53.7 67 -99 SPO 1997 04 16 06 57 14 10.1 -9 687.10 -53.6 -53.7 -53.8 67 -99 SPO 1997 04 16 06 58 14 10.3 -9 687.10 -53.6 -53.7 -53.8 67 -99 SPO 1997 04 16 06 59 14 10.0 -9 687.10 -53.6 -53.6 -53.8 66 -99 SPO 1997 04 16 07 00 15 10.2 -9 687.10 -53.6 -53.6 -53.7 65 0 SPO 1997 04 16 07 01 15 10.1 -9 687.10 -53.6 -53.6 -53.7 65 -99 SPO 1997 04 16 07 02 15 10.4 -9 687.10 -53.6 -53.6 -53.8 65 -99 SPO 1997 04 16 07 03 15 9.6 -9 687.10 -53.6 -53.6 -53.8 65 -99 SPO 1997 04 16 07 04 14 10.4 -9 687.10 -53.6 -53.6 -53.8 65 -99 SPO 1997 04 16 07 05 14 9.7 -9 687.10 -53.6 -53.6 -53.8 65 -99 SPO 1997 04 16 07 06 15 9.9 -9 687.10 -53.7 -53.6 -53.8 66 -99 SPO 1997 04 16 07 07 14 9.9 -9 687.10 -53.7 -53.6 -53.8 66 -99 SPO 1997 04 16 07 08 14 9.9 -9 687.10 -53.7 -53.6 -53.8 66 -99 SPO 1997 04 16 07 09 15 9.5 -9 687.20 -53.7 -53.6 -53.8 65 -99 SPO 1997 04 16 07 10 15 10.0 -9 687.10 -53.7 -53.6 -53.8 65 -99 SPO 1997 04 16 07 11 15 10.1 -9 687.20 -53.7 -53.6 -53.7 65 -99 SPO 1997 04 16 07 12 15 10.5 -9 687.10 -53.7 -53.6 -53.7 65 -99 SPO 1997 04 16 07 13 15 10.0 -9 687.10 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 16 07 14 14 11.0 -9 687.10 -53.6 -53.5 -53.6 64 -99 SPO 1997 04 16 07 15 15 10.4 -9 687.20 -53.6 -53.5 -53.6 64 -99 SPO 1997 04 16 07 16 15 10.3 -9 687.20 -53.6 -53.5 -53.6 64 -99 SPO 1997 04 16 07 17 15 10.3 -9 687.20 -53.6 -53.5 -53.6 65 -99 SPO 1997 04 16 07 18 15 10.2 -9 687.20 -53.5 -53.4 -53.6 64 -99 SPO 1997 04 16 07 19 15 10.3 -9 687.20 -53.5 -53.4 -53.6 65 -99 SPO 1997 04 16 07 20 15 10.8 -9 687.20 -53.5 -53.4 -53.6 65 -99 SPO 1997 04 16 07 21 15 10.4 -9 687.10 -53.5 -53.3 -53.6 65 -99 SPO 1997 04 16 07 22 16 10.7 -9 687.10 -53.5 -53.2 -53.5 65 -99 SPO 1997 04 16 07 23 17 10.5 -9 687.10 -53.5 -53.2 -53.5 65 -99 SPO 1997 04 16 07 24 17 10.4 -9 687.10 -53.4 -53.2 -53.5 64 -99 SPO 1997 04 16 07 25 17 10.7 -9 687.10 -53.4 -53.2 -53.4 64 -99 SPO 1997 04 16 07 26 18 10.5 -9 687.10 -53.4 -53.2 -53.4 64 -99 SPO 1997 04 16 07 27 17 10.5 -9 687.10 -53.4 -53.2 -53.4 64 -99 SPO 1997 04 16 07 28 17 10.7 -9 687.10 -53.3 -53.2 -53.3 64 -99 SPO 1997 04 16 07 29 17 10.5 -9 687.10 -53.3 -53.2 -53.3 65 -99 SPO 1997 04 16 07 30 17 10.2 -9 687.10 -53.3 -53.1 -53.4 65 -99 SPO 1997 04 16 07 31 18 10.5 -9 687.10 -53.2 -53.1 -53.3 65 -99 SPO 1997 04 16 07 32 18 10.3 -9 687.10 -53.2 -53.1 -53.2 65 -99 SPO 1997 04 16 07 33 18 10.3 -9 687.10 -53.2 -53.0 -53.2 66 -99 SPO 1997 04 16 07 34 18 10.5 -9 687.10 -53.2 -53.0 -53.2 66 -99 SPO 1997 04 16 07 35 18 10.4 -9 687.10 -53.1 -53.0 -53.2 65 -99 SPO 1997 04 16 07 36 18 10.3 -9 687.00 -53.1 -52.9 -53.1 65 -99 SPO 1997 04 16 07 37 18 9.7 -9 687.00 -53.1 -52.9 -53.1 65 -99 SPO 1997 04 16 07 38 19 10.1 -9 687.00 -53.0 -52.8 -53.1 64 -99 SPO 1997 04 16 07 39 19 10.3 -9 687.00 -53.0 -52.8 -53.0 65 -99 SPO 1997 04 16 07 40 19 10.1 -9 687.00 -53.0 -52.7 -52.9 66 -99 SPO 1997 04 16 07 41 19 10.0 -9 687.00 -52.9 -52.7 -53.0 65 -99 SPO 1997 04 16 07 42 18 10.4 -9 687.00 -52.9 -52.7 -52.9 65 -99 SPO 1997 04 16 07 43 18 10.8 -9 687.00 -52.9 -52.8 -53.0 66 -99 SPO 1997 04 16 07 44 17 10.7 -9 687.00 -52.9 -52.8 -53.0 66 -99 SPO 1997 04 16 07 45 16 10.3 -9 687.00 -52.9 -52.8 -52.9 66 -99 SPO 1997 04 16 07 46 15 10.6 -9 687.00 -52.8 -52.7 -52.9 65 -99 SPO 1997 04 16 07 47 15 10.1 -9 687.00 -52.8 -52.7 -52.9 65 -99 SPO 1997 04 16 07 48 16 10.2 -9 687.00 -52.8 -52.7 -52.9 65 -99 SPO 1997 04 16 07 49 15 9.6 -9 687.10 -52.8 -52.6 -52.8 65 -99 SPO 1997 04 16 07 50 15 9.4 -9 687.10 -52.8 -52.6 -52.9 65 -99 SPO 1997 04 16 07 51 16 9.3 -9 687.10 -52.8 -52.6 -52.9 65 -99 SPO 1997 04 16 07 52 15 9.6 -9 687.20 -52.8 -52.6 -52.8 66 -99 SPO 1997 04 16 07 53 14 9.9 -9 687.20 -52.8 -52.6 -52.8 66 -99 SPO 1997 04 16 07 54 16 10.0 -9 687.20 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 07 55 15 10.0 -9 687.20 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 07 56 15 9.6 -9 687.20 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 07 57 15 9.6 -9 687.10 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 07 58 15 9.7 -9 687.10 -52.7 -52.6 -52.9 65 -99 SPO 1997 04 16 07 59 15 9.5 -9 687.10 -52.7 -52.6 -52.9 65 -99 SPO 1997 04 16 08 00 15 9.9 -9 687.10 -52.7 -52.6 -52.8 65 0 SPO 1997 04 16 08 01 15 9.9 -9 687.20 -52.7 -52.6 -52.8 65 -99 SPO 1997 04 16 08 02 15 10.2 -9 687.10 -52.7 -52.6 -52.7 65 -99 SPO 1997 04 16 08 03 15 9.5 -9 687.10 -52.7 -52.6 -52.7 66 -99 SPO 1997 04 16 08 04 17 10.1 -9 687.10 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 08 05 17 10.0 -9 687.10 -52.7 -52.7 -52.8 67 -99 SPO 1997 04 16 08 06 18 10.4 -9 687.10 -52.7 -52.7 -52.8 67 -99 SPO 1997 04 16 08 07 17 10.2 -9 687.10 -52.7 -52.7 -52.9 67 -99 SPO 1997 04 16 08 08 18 10.7 -9 687.10 -52.7 -52.7 -52.8 66 -99 SPO 1997 04 16 08 09 16 10.7 -9 687.00 -52.7 -52.6 -52.8 66 -99 SPO 1997 04 16 08 10 16 10.7 -9 687.00 -52.7 -52.6 -52.7 65 -99 SPO 1997 04 16 08 11 15 10.7 -9 687.00 -52.7 -52.5 -52.7 65 -99 SPO 1997 04 16 08 12 16 10.5 -9 687.00 -52.6 -52.5 -52.8 65 -99 SPO 1997 04 16 08 13 16 10.5 -9 687.00 -52.6 -52.4 -52.7 65 -99 SPO 1997 04 16 08 14 15 10.1 -9 687.00 -52.6 -52.4 -52.7 65 -99 SPO 1997 04 16 08 15 15 10.6 -9 687.00 -52.6 -52.4 -52.7 66 -99 SPO 1997 04 16 08 16 15 10.5 -9 687.00 -52.6 -52.3 -52.6 66 -99 SPO 1997 04 16 08 17 13 11.1 -9 687.00 -52.6 -52.3 -52.6 66 -99 SPO 1997 04 16 08 18 13 10.9 -9 687.00 -52.5 -52.3 -52.5 66 -99 SPO 1997 04 16 08 19 13 10.7 -9 687.00 -52.5 -52.4 -52.5 67 -99 SPO 1997 04 16 08 20 13 10.2 -9 687.10 -52.5 -52.4 -52.6 67 -99 SPO 1997 04 16 08 21 13 10.7 -9 687.00 -52.5 -52.4 -52.6 67 -99 SPO 1997 04 16 08 22 13 10.8 -9 687.00 -52.4 -52.3 -52.5 66 -99 SPO 1997 04 16 08 23 12 11.2 -9 687.00 -52.4 -52.2 -52.4 65 -99 SPO 1997 04 16 08 24 13 11.1 -9 687.00 -52.4 -52.2 -52.3 65 -99 SPO 1997 04 16 08 25 13 10.9 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 26 12 10.7 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 27 11 10.6 -9 687.00 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 16 08 28 11 10.8 -9 687.10 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 29 12 10.1 -9 687.00 -52.3 -52.2 -52.4 66 -99 SPO 1997 04 16 08 30 12 10.3 -9 687.00 -52.3 -52.1 -52.4 66 -99 SPO 1997 04 16 08 31 11 10.8 -9 687.00 -52.3 -52.2 -52.4 66 -99 SPO 1997 04 16 08 32 12 11.2 -9 687.00 -52.3 -52.1 -52.4 66 -99 SPO 1997 04 16 08 33 12 10.7 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 34 13 10.9 -9 687.10 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 35 12 10.3 -9 687.00 -52.3 -52.2 -52.4 64 -99 SPO 1997 04 16 08 36 11 11.0 -9 687.00 -52.3 -52.2 -52.4 64 -99 SPO 1997 04 16 08 37 11 10.9 -9 687.00 -52.3 -52.2 -52.4 64 -99 SPO 1997 04 16 08 38 12 10.8 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 39 13 11.0 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 40 12 10.4 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 41 14 11.2 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 42 12 10.7 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 43 12 10.9 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 44 11 11.0 -9 687.00 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 16 08 45 12 11.0 -9 687.00 -52.3 -52.1 -52.3 65 -99 SPO 1997 04 16 08 46 12 11.2 -9 687.00 -52.2 -52.1 -52.3 65 -99 SPO 1997 04 16 08 47 11 11.3 -9 687.00 -52.2 -52.0 -52.2 65 -99 SPO 1997 04 16 08 48 12 10.5 -9 687.00 -52.2 -52.0 -52.3 65 -99 SPO 1997 04 16 08 49 12 10.6 -9 687.00 -52.2 -52.0 -52.3 64 -99 SPO 1997 04 16 08 50 12 10.5 -9 687.10 -52.2 -52.0 -52.3 65 -99 SPO 1997 04 16 08 51 12 10.9 -9 687.10 -52.2 -52.0 -52.3 65 -99 SPO 1997 04 16 08 52 13 10.6 -9 687.10 -52.2 -52.1 -52.3 65 -99 SPO 1997 04 16 08 53 13 10.4 -9 687.10 -52.2 -52.1 -52.3 65 -99 SPO 1997 04 16 08 54 12 10.6 -9 687.10 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 16 08 55 12 10.5 -9 687.20 -52.2 -52.2 -52.4 65 -99 SPO 1997 04 16 08 56 12 10.4 -9 687.10 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 16 08 57 11 11.2 -9 687.20 -52.2 -52.1 -52.3 65 -99 SPO 1997 04 16 08 58 11 10.7 -9 687.20 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 16 08 59 12 10.6 -9 687.20 -52.2 -52.1 -52.3 64 -99 SPO 1997 04 16 09 00 14 10.7 -9 687.20 -52.2 -52.1 -52.2 64 0 SPO 1997 04 16 09 01 14 10.5 -9 687.20 -52.2 -52.0 -52.2 64 -99 SPO 1997 04 16 09 02 14 10.5 -9 687.20 -52.1 -52.0 -52.2 64 -99 SPO 1997 04 16 09 03 14 10.4 -9 687.20 -52.1 -52.0 -52.2 65 -99 SPO 1997 04 16 09 04 14 10.6 -9 687.20 -52.1 -52.0 -52.2 65 -99 SPO 1997 04 16 09 05 14 10.8 -9 687.20 -52.1 -52.0 -52.2 66 -99 SPO 1997 04 16 09 06 13 10.7 -9 687.20 -52.1 -51.9 -52.1 66 -99 SPO 1997 04 16 09 07 13 10.4 -9 687.20 -52.1 -51.9 -52.2 66 -99 SPO 1997 04 16 09 08 13 10.5 -9 687.20 -52.1 -51.9 -52.1 66 -99 SPO 1997 04 16 09 09 13 10.2 -9 687.20 -52.0 -52.0 -52.1 65 -99 SPO 1997 04 16 09 10 13 10.1 -9 687.20 -52.0 -52.0 -52.1 65 -99 SPO 1997 04 16 09 11 12 10.4 -9 687.20 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 16 09 12 12 9.7 -9 687.20 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 16 09 13 14 10.3 -9 687.30 -52.0 -52.1 -52.2 65 -99 SPO 1997 04 16 09 14 14 10.3 -9 687.30 -52.1 -52.2 -52.2 65 -99 SPO 1997 04 16 09 15 13 10.2 -9 687.30 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 16 09 16 13 10.6 -9 687.20 -52.1 -52.1 -52.2 66 -99 SPO 1997 04 16 09 17 12 10.4 -9 687.20 -52.1 -52.0 -52.1 66 -99 SPO 1997 04 16 09 18 13 10.4 -9 687.20 -52.1 -52.0 -52.2 66 -99 SPO 1997 04 16 09 19 12 10.4 -9 687.20 -52.1 -52.0 -52.1 66 -99 SPO 1997 04 16 09 20 11 10.1 -9 687.20 -52.1 -52.0 -52.2 66 -99 SPO 1997 04 16 09 21 13 10.9 -9 687.20 -52.0 -51.9 -52.1 65 -99 SPO 1997 04 16 09 22 12 11.1 -9 687.20 -52.0 -51.9 -52.1 65 -99 SPO 1997 04 16 09 23 13 10.1 -9 687.20 -52.0 -51.9 -52.2 65 -99 SPO 1997 04 16 09 24 14 10.5 -9 687.20 -52.0 -51.9 -52.1 65 -99 SPO 1997 04 16 09 25 15 11.0 -9 687.20 -52.0 -51.8 -52.0 66 -99 SPO 1997 04 16 09 26 15 11.4 -9 687.10 -51.9 -51.8 -52.0 65 -99 SPO 1997 04 16 09 27 15 11.1 -9 687.10 -51.9 -51.9 -52.0 66 -99 SPO 1997 04 16 09 28 14 11.0 -9 687.10 -52.0 -51.9 -52.1 68 -99 SPO 1997 04 16 09 29 15 10.8 -9 687.00 -52.0 -51.9 -52.1 69 -99 SPO 1997 04 16 09 30 14 11.2 -9 687.10 -51.9 -52.0 -52.1 68 -99 SPO 1997 04 16 09 31 14 11.4 -9 687.00 -51.9 -51.9 -52.1 68 -99 SPO 1997 04 16 09 32 14 11.5 -9 687.00 -52.0 -51.9 -52.0 68 -99 SPO 1997 04 16 09 33 14 11.5 -9 687.00 -51.9 -51.8 -52.0 66 -99 SPO 1997 04 16 09 34 14 11.6 -9 686.90 -51.9 -51.8 -52.0 66 -99 SPO 1997 04 16 09 35 14 11.3 -9 686.90 -51.9 -51.8 -51.9 66 -99 SPO 1997 04 16 09 36 14 11.8 -9 686.90 -51.9 -51.7 -51.9 66 -99 SPO 1997 04 16 09 37 14 11.6 -9 686.90 -51.8 -51.6 -51.9 65 -99 SPO 1997 04 16 09 38 14 11.9 -9 686.90 -51.8 -51.6 -51.8 66 -99 SPO 1997 04 16 09 39 13 12.1 -9 686.90 -51.8 -51.6 -51.7 66 -99 SPO 1997 04 16 09 40 12 12.2 -9 686.90 -51.7 -51.5 -51.8 66 -99 SPO 1997 04 16 09 41 13 12.3 -9 686.90 -51.7 -51.4 -51.7 67 -99 SPO 1997 04 16 09 42 13 11.9 -9 686.90 -51.6 -51.3 -51.7 66 -99 SPO 1997 04 16 09 43 12 12.1 -9 686.90 -51.6 -51.3 -51.7 66 -99 SPO 1997 04 16 09 44 11 12.0 -9 686.90 -51.6 -51.3 -51.6 66 -99 SPO 1997 04 16 09 45 12 12.6 -9 686.90 -51.6 -51.3 -51.5 66 -99 SPO 1997 04 16 09 46 10 12.5 -9 686.90 -51.5 -51.3 -51.5 66 -99 SPO 1997 04 16 09 47 10 12.3 -9 686.90 -51.4 -51.3 -51.4 65 -99 SPO 1997 04 16 09 48 10 11.8 -9 686.90 -51.4 -51.2 -51.5 65 -99 SPO 1997 04 16 09 49 12 11.8 -9 686.90 -51.4 -51.2 -51.4 66 -99 SPO 1997 04 16 09 50 12 11.7 -9 686.90 -51.4 -51.2 -51.5 66 -99 SPO 1997 04 16 09 51 12 12.2 -9 687.00 -51.4 -51.2 -51.5 67 -99 SPO 1997 04 16 09 52 12 12.0 -9 686.90 -51.4 -51.3 -51.6 67 -99 SPO 1997 04 16 09 53 12 11.9 -9 686.90 -51.4 -51.2 -51.5 68 -99 SPO 1997 04 16 09 54 11 11.6 -9 687.00 -51.4 -51.3 -51.6 68 -99 SPO 1997 04 16 09 55 11 11.5 -9 687.00 -51.5 -51.4 -51.6 69 -99 SPO 1997 04 16 09 56 11 11.9 -9 686.90 -51.5 -51.3 -51.6 68 -99 SPO 1997 04 16 09 57 12 11.9 -9 686.90 -51.5 -51.3 -51.6 67 -99 SPO 1997 04 16 09 58 13 11.6 -9 686.90 -51.5 -51.3 -51.6 66 -99 SPO 1997 04 16 09 59 13 11.6 -9 686.90 -51.5 -51.3 -51.6 66 -99 SPO 1997 04 16 10 00 12 12.0 -9 687.00 -51.5 -51.3 -51.6 65 0 SPO 1997 04 16 10 01 12 12.0 -9 687.00 -51.4 -51.2 -51.5 64 -99 SPO 1997 04 16 10 02 12 12.0 -9 687.00 -51.4 -51.3 -51.5 65 -99 SPO 1997 04 16 10 03 11 12.0 -9 687.00 -51.4 -51.3 -51.5 66 -99 SPO 1997 04 16 10 04 11 12.0 -9 687.00 -51.4 -51.4 -51.6 67 -99 SPO 1997 04 16 10 05 11 11.8 -9 687.00 -51.4 -51.4 -51.6 67 -99 SPO 1997 04 16 10 06 10 12.3 -9 687.00 -51.4 -51.4 -51.6 67 -99 SPO 1997 04 16 10 07 11 12.0 -9 687.00 -51.5 -51.3 -51.6 68 -99 SPO 1997 04 16 10 08 11 11.8 -9 687.00 -51.5 -51.3 -51.6 68 -99 SPO 1997 04 16 10 09 12 12.1 -9 687.00 -51.5 -51.3 -51.6 67 -99 SPO 1997 04 16 10 10 11 12.1 -9 687.00 -51.5 -51.3 -51.6 67 -99 SPO 1997 04 16 10 11 12 12.0 -9 687.00 -51.5 -51.3 -51.6 66 -99 SPO 1997 04 16 10 12 12 12.0 -9 687.00 -51.4 -51.2 -51.5 65 -99 SPO 1997 04 16 10 13 11 12.0 -9 687.10 -51.4 -51.2 -51.5 66 -99 SPO 1997 04 16 10 14 11 11.6 -9 687.10 -51.4 -51.2 -51.5 66 -99 SPO 1997 04 16 10 15 11 11.6 -9 687.10 -51.4 -51.2 -51.5 67 -99 SPO 1997 04 16 10 16 12 11.3 -9 687.10 -51.4 -51.2 -51.5 67 -99 SPO 1997 04 16 10 17 13 11.6 -9 687.10 -51.4 -51.2 -51.4 67 -99 SPO 1997 04 16 10 18 13 11.9 -9 687.10 -51.4 -51.1 -51.4 67 -99 SPO 1997 04 16 10 19 13 11.8 -9 687.10 -51.3 -51.0 -51.3 67 -99 SPO 1997 04 16 10 20 12 11.8 -9 687.10 -51.3 -51.0 -51.2 67 -99 SPO 1997 04 16 10 21 13 11.7 -9 687.10 -51.2 -51.0 -51.2 66 -99 SPO 1997 04 16 10 22 12 11.7 -9 687.20 -51.1 -51.0 -51.2 66 -99 SPO 1997 04 16 10 23 12 11.4 -9 687.20 -51.1 -51.0 -51.2 66 -99 SPO 1997 04 16 10 24 12 11.5 -9 687.20 -51.1 -51.1 -51.3 67 -99 SPO 1997 04 16 10 25 13 11.4 -9 687.20 -51.2 -51.2 -51.4 67 -99 SPO 1997 04 16 10 26 12 11.0 -9 687.20 -51.2 -51.2 -51.5 67 -99 SPO 1997 04 16 10 27 13 11.9 -9 687.20 -51.3 -51.2 -51.5 68 -99 SPO 1997 04 16 10 28 12 11.5 -9 687.20 -51.3 -51.2 -51.4 69 -99 SPO 1997 04 16 10 29 12 11.4 -9 687.20 -51.3 -51.2 -51.5 69 -99 SPO 1997 04 16 10 30 14 11.5 -9 687.20 -51.3 -51.2 -51.4 69 -99 SPO 1997 04 16 10 31 14 11.1 -9 687.20 -51.3 -51.2 -51.4 69 -99 SPO 1997 04 16 10 32 14 11.2 -9 687.20 -51.3 -51.2 -51.4 68 -99 SPO 1997 04 16 10 33 15 11.5 -9 687.20 -51.3 -51.2 -51.4 67 -99 SPO 1997 04 16 10 34 15 11.2 -9 687.20 -51.3 -51.2 -51.4 67 -99 SPO 1997 04 16 10 35 16 11.0 -9 687.30 -51.3 -51.2 -51.4 66 -99 SPO 1997 04 16 10 36 17 10.7 -9 687.30 -51.3 -51.2 -51.4 66 -99 SPO 1997 04 16 10 37 17 10.9 -9 687.30 -51.3 -51.3 -51.5 67 -99 SPO 1997 04 16 10 38 16 11.1 -9 687.30 -51.3 -51.3 -51.4 68 -99 SPO 1997 04 16 10 39 18 11.4 -9 687.30 -51.3 -51.3 -51.4 68 -99 SPO 1997 04 16 10 40 17 11.0 -9 687.30 -51.3 -51.3 -51.4 69 -99 SPO 1997 04 16 10 41 17 10.6 -9 687.30 -51.3 -51.2 -51.4 69 -99 SPO 1997 04 16 10 42 17 10.9 -9 687.30 -51.3 -51.2 -51.4 69 -99 SPO 1997 04 16 10 43 15 11.0 -9 687.30 -51.3 -51.2 -51.3 69 -99 SPO 1997 04 16 10 44 16 10.7 -9 687.30 -51.3 -51.2 -51.3 68 -99 SPO 1997 04 16 10 45 16 11.4 -9 687.30 -51.2 -51.0 -51.2 67 -99 SPO 1997 04 16 10 46 15 11.9 -9 687.20 -51.1 -50.8 -50.9 67 -99 SPO 1997 04 16 10 47 17 11.4 -9 687.20 -51.0 -50.8 -51.0 67 -99 SPO 1997 04 16 10 48 16 11.4 -9 687.30 -51.0 -51.0 -51.2 67 -99 SPO 1997 04 16 10 49 18 11.0 -9 687.30 -51.0 -51.0 -51.2 67 -99 SPO 1997 04 16 10 50 19 10.5 -9 687.30 -51.1 -51.2 -51.4 67 -99 SPO 1997 04 16 10 51 18 10.8 -9 687.30 -51.2 -51.2 -51.4 68 -99 SPO 1997 04 16 10 52 18 10.4 -9 687.30 -51.2 -51.2 -51.4 68 -99 SPO 1997 04 16 10 53 17 10.5 -9 687.30 -51.3 -51.3 -51.4 67 -99 SPO 1997 04 16 10 54 16 10.7 -9 687.20 -51.3 -51.3 -51.4 67 -99 SPO 1997 04 16 10 55 16 10.4 -9 687.30 -51.3 -51.4 -51.5 67 -99 SPO 1997 04 16 10 56 13 10.5 -9 687.30 -51.3 -51.4 -51.5 66 -99 SPO 1997 04 16 10 57 14 10.8 -9 687.20 -51.3 -51.4 -51.5 66 -99 SPO 1997 04 16 10 58 13 10.7 -9 687.30 -51.3 -51.4 -51.5 64 -99 SPO 1997 04 16 10 59 12 10.7 -9 687.20 -51.3 -51.3 -51.4 64 -99 SPO 1997 04 16 11 00 13 10.8 -9 687.20 -51.3 -51.3 -51.4 66 0 SPO 1997 04 16 11 01 12 10.8 -9 687.20 -51.3 -51.2 -51.4 66 -99 SPO 1997 04 16 11 02 13 10.9 -9 687.20 -51.3 -51.2 -51.4 66 -99 SPO 1997 04 16 11 03 12 10.9 -9 687.20 -51.3 -51.2 -51.4 67 -99 SPO 1997 04 16 11 04 12 11.1 -9 687.20 -51.3 -51.2 -51.4 67 -99 SPO 1997 04 16 11 05 12 11.4 -9 687.10 -51.2 -51.2 -51.3 67 -99 SPO 1997 04 16 11 06 13 11.0 -9 687.20 -51.2 -51.1 -51.3 67 -99 SPO 1997 04 16 11 07 12 11.3 -9 687.10 -51.2 -51.1 -51.3 67 -99 SPO 1997 04 16 11 08 12 11.0 -9 687.10 -51.2 -51.0 -51.2 67 -99 SPO 1997 04 16 11 09 11 11.8 -9 687.10 -51.1 -50.9 -51.1 67 -99 SPO 1997 04 16 11 10 10 10.9 -9 687.10 -51.1 -50.8 -51.1 66 -99 SPO 1997 04 16 11 11 10 11.1 -9 687.10 -51.0 -50.8 -51.0 65 -99 SPO 1997 04 16 11 12 10 11.4 -9 687.10 -51.0 -50.8 -51.0 66 -99 SPO 1997 04 16 11 13 10 11.3 -9 687.10 -50.9 -50.7 -50.8 66 -99 SPO 1997 04 16 11 14 11 11.9 -9 687.10 -50.8 -50.6 -50.7 67 -99 SPO 1997 04 16 11 15 12 11.7 -9 687.10 -50.7 -50.7 -50.8 67 -99 SPO 1997 04 16 11 16 12 11.6 -9 687.00 -50.7 -50.7 -50.9 68 -99 SPO 1997 04 16 11 17 13 11.9 -9 687.00 -50.8 -50.7 -50.9 69 -99 SPO 1997 04 16 11 18 13 11.5 -9 687.00 -50.8 -50.7 -50.9 69 -99 SPO 1997 04 16 11 19 13 11.2 -9 687.00 -50.8 -50.7 -50.9 69 -99 SPO 1997 04 16 11 20 12 11.7 -9 687.00 -50.8 -50.7 -51.0 68 -99 SPO 1997 04 16 11 21 12 12.1 -9 687.00 -50.8 -50.6 -50.9 67 -99 SPO 1997 04 16 11 22 10 12.0 -9 687.00 -50.8 -50.6 -50.8 67 -99 SPO 1997 04 16 11 23 9 12.0 -9 687.00 -50.8 -50.5 -50.8 67 -99 SPO 1997 04 16 11 24 9 11.9 -9 687.00 -50.7 -50.5 -50.8 67 -99 SPO 1997 04 16 11 25 9 11.7 -9 687.10 -50.7 -50.5 -50.8 68 -99 SPO 1997 04 16 11 26 11 11.6 -9 687.10 -50.7 -50.4 -50.8 69 -99 SPO 1997 04 16 11 27 12 10.8 -9 687.10 -50.7 -50.5 -50.8 69 -99 SPO 1997 04 16 11 28 13 11.2 -9 687.20 -50.7 -50.6 -50.9 68 -99 SPO 1997 04 16 11 29 13 10.1 -9 687.20 -50.7 -50.6 -50.9 68 -99 SPO 1997 04 16 11 30 13 10.6 -9 687.20 -50.7 -50.7 -50.9 68 -99 SPO 1997 04 16 11 31 13 10.8 -9 687.20 -50.7 -50.6 -50.8 67 -99 SPO 1997 04 16 11 32 12 11.3 -9 687.20 -50.6 -50.6 -50.7 66 -99 SPO 1997 04 16 11 33 13 11.0 -9 687.20 -50.7 -50.5 -50.6 67 -99 SPO 1997 04 16 11 34 13 10.9 -9 687.20 -50.6 -50.5 -50.6 67 -99 SPO 1997 04 16 11 35 13 11.4 -9 687.20 -50.6 -50.5 -50.6 67 -99 SPO 1997 04 16 11 36 12 11.3 -9 687.20 -50.5 -50.4 -50.6 67 -99 SPO 1997 04 16 11 37 12 11.1 -9 687.20 -50.5 -50.4 -50.5 67 -99 SPO 1997 04 16 11 38 11 11.2 -9 687.20 -50.4 -50.3 -50.5 67 -99 SPO 1997 04 16 11 39 11 10.9 -9 687.20 -50.4 -50.4 -50.5 68 -99 SPO 1997 04 16 11 40 11 11.7 -9 687.20 -50.4 -50.3 -50.5 69 -99 SPO 1997 04 16 11 41 11 11.5 -9 687.20 -50.4 -50.3 -50.4 69 -99 SPO 1997 04 16 11 42 11 11.3 -9 687.20 -50.4 -50.2 -50.4 69 -99 SPO 1997 04 16 11 43 11 11.0 -9 687.20 -50.3 -50.2 -50.4 68 -99 SPO 1997 04 16 11 44 12 11.7 -9 687.20 -50.3 -50.2 -50.3 68 -99 SPO 1997 04 16 11 45 12 11.6 -9 687.20 -50.3 -50.1 -50.3 67 -99 SPO 1997 04 16 11 46 9 12.0 -9 687.20 -50.2 -50.1 -50.2 66 -99 SPO 1997 04 16 11 47 14 11.2 -9 687.20 -50.2 -50.1 -50.3 67 -99 SPO 1997 04 16 11 48 11 11.6 -9 687.20 -50.2 -50.2 -50.3 68 -99 SPO 1997 04 16 11 49 12 12.0 -9 687.20 -50.2 -50.2 -50.3 68 -99 SPO 1997 04 16 11 50 13 11.8 -9 687.20 -50.2 -50.2 -50.3 68 -99 SPO 1997 04 16 11 51 11 11.9 -9 687.20 -50.2 -50.2 -50.3 69 -99 SPO 1997 04 16 11 52 11 11.4 -9 687.20 -50.2 -50.2 -50.3 69 -99 SPO 1997 04 16 11 53 11 11.5 -9 687.20 -50.3 -50.1 -50.3 71 -99 SPO 1997 04 16 11 54 11 11.2 -9 687.10 -50.2 -50.1 -50.3 70 -99 SPO 1997 04 16 11 55 10 11.3 -9 687.20 -50.1 -50.1 -50.2 68 -99 SPO 1997 04 16 11 56 12 11.1 -9 687.20 -50.1 -50.0 -50.2 67 -99 SPO 1997 04 16 11 57 12 11.4 -9 687.20 -50.1 -50.0 -50.2 67 -99 SPO 1997 04 16 11 58 11 12.0 -9 687.10 -50.1 -49.9 -50.2 67 -99 SPO 1997 04 16 11 59 11 11.2 -9 687.10 -50.1 -49.8 -50.1 68 -99 SPO 1997 04 16 12 00 11 11.6 -9 687.10 -50.0 -49.8 -50.0 68 0 SPO 1997 04 16 12 01 13 11.4 -9 687.20 -50.0 -49.8 -50.0 68 -99 SPO 1997 04 16 12 02 13 12.4 -9 687.10 -50.0 -49.7 -50.0 69 -99 SPO 1997 04 16 12 03 11 12.2 -9 687.20 -49.9 -49.7 -49.9 68 -99 SPO 1997 04 16 12 04 11 11.7 -9 687.20 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 05 13 11.6 -9 687.20 -49.9 -49.9 -50.1 69 -99 SPO 1997 04 16 12 06 14 11.3 -9 687.20 -50.0 -49.9 -50.1 70 -99 SPO 1997 04 16 12 07 14 11.4 -9 687.20 -50.0 -49.9 -50.0 68 -99 SPO 1997 04 16 12 08 11 11.5 -9 687.20 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 09 11 11.4 -9 687.20 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 10 12 11.2 -9 687.20 -50.0 -49.8 -50.0 68 -99 SPO 1997 04 16 12 11 14 11.3 -9 687.20 -50.0 -49.8 -50.0 68 -99 SPO 1997 04 16 12 12 13 11.0 -9 687.20 -50.0 -49.9 -50.0 68 -99 SPO 1997 04 16 12 13 13 11.8 -9 687.20 -49.9 -49.9 -50.1 68 -99 SPO 1997 04 16 12 14 12 11.0 -9 687.20 -49.9 -49.9 -50.1 68 -99 SPO 1997 04 16 12 15 12 11.0 -9 687.20 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 16 15 10.7 -9 687.30 -49.9 -49.9 -50.1 68 -99 SPO 1997 04 16 12 17 15 10.9 -9 687.30 -49.9 -49.8 -50.1 69 -99 SPO 1997 04 16 12 18 16 11.1 -9 687.30 -49.9 -49.8 -50.0 69 -99 SPO 1997 04 16 12 19 14 11.0 -9 687.30 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 20 13 11.2 -9 687.30 -49.9 -49.8 -50.0 68 -99 SPO 1997 04 16 12 21 12 10.8 -9 687.30 -49.9 -49.8 -50.0 67 -99 SPO 1997 04 16 12 22 14 10.8 -9 687.30 -49.9 -49.9 -50.1 67 -99 SPO 1997 04 16 12 23 17 10.1 -9 687.30 -49.9 -49.9 -50.1 68 -99 SPO 1997 04 16 12 24 17 10.7 -9 687.30 -50.0 -49.9 -50.0 69 -99 SPO 1997 04 16 12 25 14 11.0 -9 687.20 -49.9 -49.9 -50.0 68 -99 SPO 1997 04 16 12 26 12 11.5 -9 687.30 -49.9 -49.9 -50.0 69 -99 SPO 1997 04 16 12 27 11 11.1 -9 687.20 -49.9 -49.8 -49.9 69 -99 SPO 1997 04 16 12 28 10 11.1 -9 687.30 -49.9 -49.8 -49.9 70 -99 SPO 1997 04 16 12 29 12 11.1 -9 687.30 -49.9 -49.8 -49.8 70 -99 SPO 1997 04 16 12 30 13 10.1 -9 687.30 -49.8 -49.7 -49.9 69 -99 SPO 1997 04 16 12 31 13 11.1 -9 687.30 -49.8 -49.7 -49.9 68 -99 SPO 1997 04 16 12 32 12 10.6 -9 687.20 -49.7 -49.8 -49.9 68 -99 SPO 1997 04 16 12 33 12 11.9 -9 687.20 -49.8 -49.8 -50.0 68 -99 SPO 1997 04 16 12 34 11 11.5 -9 687.20 -49.8 -49.8 -50.0 68 -99 SPO 1997 04 16 12 35 10 11.9 -9 687.20 -49.8 -49.8 -50.0 68 -99 SPO 1997 04 16 12 36 9 11.7 -9 687.10 -49.8 -49.7 -49.9 68 -99 SPO 1997 04 16 12 37 8 11.5 -9 687.10 -49.8 -49.7 -49.9 68 -99 SPO 1997 04 16 12 38 9 11.2 -9 687.20 -49.8 -49.7 -49.9 68 -99 SPO 1997 04 16 12 39 10 11.9 -9 687.10 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 12 40 10 11.4 -9 687.20 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 12 41 11 11.3 -9 687.20 -49.8 -49.6 -49.7 69 -99 SPO 1997 04 16 12 42 10 11.9 -9 687.20 -49.8 -49.6 -49.7 68 -99 SPO 1997 04 16 12 43 10 12.0 -9 687.20 -49.7 -49.6 -49.8 68 -99 SPO 1997 04 16 12 44 10 11.9 -9 687.20 -49.7 -49.7 -49.8 68 -99 SPO 1997 04 16 12 45 11 11.4 -9 687.20 -49.7 -49.7 -49.8 68 -99 SPO 1997 04 16 12 46 11 11.6 -9 687.20 -49.7 -49.7 -49.8 67 -99 SPO 1997 04 16 12 47 11 12.2 -9 687.20 -49.7 -49.6 -49.8 68 -99 SPO 1997 04 16 12 48 11 11.5 -9 687.10 -49.7 -49.6 -49.8 69 -99 SPO 1997 04 16 12 49 11 12.1 -9 687.20 -49.8 -49.6 -49.8 70 -99 SPO 1997 04 16 12 50 11 12.7 -9 687.20 -49.6 -49.6 -49.8 69 -99 SPO 1997 04 16 12 51 11 12.2 -9 687.20 -49.6 -49.6 -49.8 68 -99 SPO 1997 04 16 12 52 11 11.8 -9 687.20 -49.7 -49.6 -49.9 69 -99 SPO 1997 04 16 12 53 11 11.9 -9 687.20 -49.7 -49.6 -49.9 69 -99 SPO 1997 04 16 12 54 10 12.1 -9 687.20 -49.8 -49.6 -49.9 69 -99 SPO 1997 04 16 12 55 10 12.5 -9 687.10 -49.8 -49.6 -49.9 68 -99 SPO 1997 04 16 12 56 11 12.5 -9 687.20 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 12 57 11 11.9 -9 687.20 -49.8 -49.6 -49.9 67 -99 SPO 1997 04 16 12 58 11 11.4 -9 687.20 -49.8 -49.6 -49.8 67 -99 SPO 1997 04 16 12 59 13 11.4 -9 687.20 -49.8 -49.7 -49.9 68 -99 SPO 1997 04 16 13 00 11 11.5 -9 687.20 -49.8 -49.7 -49.8 68 0 SPO 1997 04 16 13 01 10 12.3 -9 687.20 -49.8 -49.7 -49.8 68 -99 SPO 1997 04 16 13 02 10 11.8 -9 687.20 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 13 03 9 11.7 -9 687.20 -49.7 -49.6 -49.8 68 -99 SPO 1997 04 16 13 04 7 12.7 -9 687.20 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 13 05 6 12.1 -9 687.20 -49.7 -49.7 -49.8 68 -99 SPO 1997 04 16 13 06 6 12.3 -9 687.20 -49.8 -49.6 -49.8 68 -99 SPO 1997 04 16 13 07 6 11.8 -9 687.20 -49.8 -49.6 -49.8 67 -99 SPO 1997 04 16 13 08 6 11.7 -9 687.20 -49.7 -49.6 -49.8 66 -99 SPO 1997 04 16 13 09 7 11.9 -9 687.20 -49.6 -49.5 -49.7 65 -99 SPO 1997 04 16 13 10 8 11.7 -9 687.20 -49.6 -49.5 -49.7 66 -99 SPO 1997 04 16 13 11 9 12.0 -9 687.20 -49.6 -49.4 -49.6 67 -99 SPO 1997 04 16 13 12 11 11.2 -9 687.30 -49.6 -49.4 -49.6 68 -99 SPO 1997 04 16 13 13 11 11.3 -9 687.30 -49.5 -49.4 -49.6 69 -99 SPO 1997 04 16 13 14 9 11.4 -9 687.30 -49.5 -49.4 -49.7 70 -99 SPO 1997 04 16 13 15 8 12.2 -9 687.30 -49.5 -49.4 -49.6 69 -99 SPO 1997 04 16 13 16 5 12.0 -9 687.20 -49.5 -49.3 -49.6 69 -99 SPO 1997 04 16 13 17 5 12.0 -9 687.20 -49.5 -49.4 -49.6 71 -99 SPO 1997 04 16 13 18 5 12.0 -9 687.30 -49.5 -49.4 -49.6 71 -99 SPO 1997 04 16 13 19 6 11.4 -9 687.40 -49.5 -49.4 -49.6 70 -99 SPO 1997 04 16 13 20 8 11.3 -9 687.40 -49.5 -49.4 -49.6 69 -99 SPO 1997 04 16 13 21 8 11.3 -9 687.40 -49.5 -49.4 -49.5 69 -99 SPO 1997 04 16 13 22 8 12.1 -9 687.30 -49.5 -49.3 -49.4 69 -99 SPO 1997 04 16 13 23 6 11.6 -9 687.30 -49.4 -49.3 -49.4 69 -99 SPO 1997 04 16 13 24 5 12.0 -9 687.30 -49.4 -49.3 -49.5 70 -99 SPO 1997 04 16 13 25 7 11.7 -9 687.30 -49.4 -49.3 -49.5 72 -99 SPO 1997 04 16 13 26 7 11.4 -9 687.40 -49.4 -49.2 -49.4 72 -99 SPO 1997 04 16 13 27 7 11.7 -9 687.40 -49.4 -49.2 -49.4 72 -99 SPO 1997 04 16 13 28 9 11.6 -9 687.40 -49.3 -49.2 -49.4 71 -99 SPO 1997 04 16 13 29 10 11.9 -9 687.40 -49.2 -49.1 -49.4 71 -99 SPO 1997 04 16 13 30 10 11.3 -9 687.40 -49.3 -49.2 -49.4 71 -99 SPO 1997 04 16 13 31 9 11.6 -9 687.40 -49.3 -49.2 -49.6 69 -99 SPO 1997 04 16 13 32 8 11.0 -9 687.40 -49.4 -49.3 -49.6 69 -99 SPO 1997 04 16 13 33 9 11.2 -9 687.40 -49.4 -49.3 -49.6 68 -99 SPO 1997 04 16 13 34 9 11.7 -9 687.40 -49.4 -49.2 -49.5 67 -99 SPO 1997 04 16 13 35 10 11.6 -9 687.30 -49.4 -49.2 -49.5 69 -99 SPO 1997 04 16 13 36 10 11.6 -9 687.40 -49.4 -49.2 -49.4 69 -99 SPO 1997 04 16 13 37 10 11.7 -9 687.40 -49.4 -49.2 -49.4 70 -99 SPO 1997 04 16 13 38 7 12.4 -9 687.30 -49.3 -49.2 -49.4 71 -99 SPO 1997 04 16 13 39 7 12.4 -9 687.30 -49.3 -49.1 -49.3 71 -99 SPO 1997 04 16 13 40 6 11.9 -9 687.30 -49.3 -49.1 -49.3 72 -99 SPO 1997 04 16 13 41 6 11.7 -9 687.30 -49.3 -49.1 -49.4 73 -99 SPO 1997 04 16 13 42 7 11.5 -9 687.30 -49.3 -49.0 -49.3 72 -99 SPO 1997 04 16 13 43 7 10.8 -9 687.30 -49.2 -49.0 -49.3 70 -99 SPO 1997 04 16 13 44 10 11.4 -9 687.30 -49.2 -48.9 -49.2 70 -99 SPO 1997 04 16 13 45 11 11.7 -9 687.30 -49.2 -48.8 -49.1 70 -99 SPO 1997 04 16 13 46 10 11.5 -9 687.40 -49.2 -48.8 -49.1 70 -99 SPO 1997 04 16 13 47 9 12.2 -9 687.30 -49.0 -48.8 -49.1 69 -99 SPO 1997 04 16 13 48 9 11.4 -9 687.30 -49.0 -48.8 -49.1 71 -99 SPO 1997 04 16 13 49 9 11.7 -9 687.30 -49.0 -48.8 -49.1 72 -99 SPO 1997 04 16 13 50 9 12.2 -9 687.30 -49.0 -48.8 -49.1 72 -99 SPO 1997 04 16 13 51 11 12.7 -9 687.30 -49.0 -48.8 -49.0 72 -99 SPO 1997 04 16 13 52 11 12.3 -9 687.30 -49.0 -48.8 -49.0 73 -99 SPO 1997 04 16 13 53 10 12.0 -9 687.20 -49.0 -48.8 -49.0 73 -99 SPO 1997 04 16 13 54 8 11.7 -9 687.20 -49.0 -48.8 -49.0 73 -99 SPO 1997 04 16 13 55 7 12.4 -9 687.20 -48.9 -48.8 -49.0 71 -99 SPO 1997 04 16 13 56 8 11.7 -9 687.20 -48.9 -48.7 -48.9 70 -99 SPO 1997 04 16 13 57 10 11.6 -9 687.30 -48.9 -48.7 -49.0 70 -99 SPO 1997 04 16 13 58 10 11.2 -9 687.30 -48.9 -48.7 -49.0 69 -99 SPO 1997 04 16 13 59 9 12.0 -9 687.20 -48.9 -48.7 -49.0 70 -99 SPO 1997 04 16 14 00 10 12.5 -9 687.20 -48.9 -48.8 -49.0 70 0 SPO 1997 04 16 14 01 7 12.3 -9 687.20 -49.0 -48.8 -49.1 71 -99 SPO 1997 04 16 14 02 8 11.9 -9 687.30 -49.0 -48.9 -49.2 71 -99 SPO 1997 04 16 14 03 8 12.6 -9 687.30 -49.0 -48.8 -49.1 71 -99 SPO 1997 04 16 14 04 6 12.3 -9 687.30 -49.0 -48.7 -49.0 72 -99 SPO 1997 04 16 14 05 6 12.5 -9 687.20 -49.0 -48.6 -49.0 73 -99 SPO 1997 04 16 14 06 5 12.2 -9 687.30 -48.8 -48.6 -48.9 71 -99 SPO 1997 04 16 14 07 4 11.4 -9 687.30 -48.8 -48.6 -48.9 70 -99 SPO 1997 04 16 14 08 5 10.7 -9 687.40 -48.8 -48.5 -48.9 70 -99 SPO 1997 04 16 14 09 7 10.4 -9 687.40 -48.8 -48.5 -48.9 69 -99 SPO 1997 04 16 14 10 8 11.8 -9 687.40 -48.8 -48.6 -48.9 69 -99 SPO 1997 04 16 14 11 9 12.8 -9 687.30 -48.8 -48.6 -48.8 69 -99 SPO 1997 04 16 14 12 8 12.6 -9 687.20 -48.8 -48.6 -48.9 71 -99 SPO 1997 04 16 14 13 6 12.8 -9 687.20 -48.8 -48.6 -48.9 72 -99 SPO 1997 04 16 14 14 7 12.4 -9 687.20 -48.8 -48.6 -48.8 73 -99 SPO 1997 04 16 14 15 8 12.5 -9 687.20 -48.8 -48.6 -48.9 73 -99 SPO 1997 04 16 14 16 7 13.0 -9 687.20 -48.8 -48.6 -48.8 73 -99 SPO 1997 04 16 14 17 7 13.5 -9 687.20 -48.8 -48.6 -48.9 73 -99 SPO 1997 04 16 14 18 6 12.7 -9 687.20 -48.8 -48.6 -49.0 73 -99 SPO 1997 04 16 14 19 8 11.8 -9 687.20 -48.8 -48.7 -49.1 72 -99 SPO 1997 04 16 14 20 8 12.7 -9 687.20 -48.9 -48.8 -49.1 71 -99 SPO 1997 04 16 14 21 9 12.8 -9 687.20 -49.0 -48.7 -49.1 71 -99 SPO 1997 04 16 14 22 8 12.9 -9 687.20 -49.0 -48.7 -49.0 71 -99 SPO 1997 04 16 14 23 9 12.6 -9 687.20 -48.9 -48.6 -49.0 72 -99 SPO 1997 04 16 14 24 8 12.1 -9 687.20 -48.9 -48.7 -49.1 73 -99 SPO 1997 04 16 14 25 9 12.1 -9 687.20 -48.9 -48.8 -49.2 73 -99 SPO 1997 04 16 14 26 7 12.8 -9 687.30 -49.0 -48.8 -49.1 74 -99 SPO 1997 04 16 14 27 7 12.7 -9 687.20 -49.0 -48.7 -49.0 74 -99 SPO 1997 04 16 14 28 7 12.6 -9 687.20 -48.9 -48.6 -49.0 73 -99 SPO 1997 04 16 14 29 7 12.6 -9 687.30 -48.9 -48.6 -48.9 74 -99 SPO 1997 04 16 14 30 7 12.2 -9 687.30 -48.9 -48.7 -49.0 74 -99 SPO 1997 04 16 14 31 8 12.5 -9 687.30 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 14 32 7 11.8 -9 687.30 -48.9 -48.8 -49.1 74 -99 SPO 1997 04 16 14 33 8 12.4 -9 687.30 -49.0 -48.8 -49.2 74 -99 SPO 1997 04 16 14 34 7 13.1 -9 687.30 -49.0 -48.8 -49.0 73 -99 SPO 1997 04 16 14 35 8 12.9 -9 687.30 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 14 36 6 12.9 -9 687.20 -48.9 -48.8 -49.0 75 -99 SPO 1997 04 16 14 37 4 13.3 -9 687.20 -48.9 -48.7 -49.0 75 -99 SPO 1997 04 16 14 38 3 13.4 -9 687.20 -48.9 -48.7 -49.0 76 -99 SPO 1997 04 16 14 39 4 12.3 -9 687.20 -48.9 -48.7 -49.1 77 -99 SPO 1997 04 16 14 40 1 12.9 -9 687.30 -49.0 -48.7 -49.1 77 -99 SPO 1997 04 16 14 41 4 11.7 -9 687.30 -49.0 -48.7 -49.2 77 -99 SPO 1997 04 16 14 42 7 12.6 -9 687.20 -49.0 -48.6 -49.0 76 -99 SPO 1997 04 16 14 43 6 12.6 -9 687.30 -48.9 -48.6 -49.1 74 -99 SPO 1997 04 16 14 44 5 12.9 -9 687.30 -49.0 -48.7 -49.1 75 -99 SPO 1997 04 16 14 45 6 13.5 -9 687.20 -49.0 -48.6 -48.9 75 -99 SPO 1997 04 16 14 46 7 13.3 -9 687.20 -48.9 -48.6 -49.0 74 -99 SPO 1997 04 16 14 47 6 13.0 -9 687.30 -48.9 -48.7 -49.0 74 -99 SPO 1997 04 16 14 48 5 13.2 -9 687.20 -48.9 -48.8 -49.0 75 -99 SPO 1997 04 16 14 49 5 13.3 -9 687.20 -48.9 -48.8 -49.0 76 -99 SPO 1997 04 16 14 50 6 13.2 -9 687.30 -48.9 -48.8 -49.1 76 -99 SPO 1997 04 16 14 51 6 12.4 -9 687.30 -49.0 -48.9 -49.2 77 -99 SPO 1997 04 16 14 52 6 12.4 -9 687.30 -49.0 -48.9 -49.2 76 -99 SPO 1997 04 16 14 53 7 12.6 -9 687.30 -49.0 -48.9 -49.2 74 -99 SPO 1997 04 16 14 54 6 13.0 -9 687.30 -49.1 -48.9 -49.1 75 -99 SPO 1997 04 16 14 55 5 13.1 -9 687.40 -49.0 -48.9 -49.1 74 -99 SPO 1997 04 16 14 56 5 12.9 -9 687.30 -49.0 -48.8 -49.1 73 -99 SPO 1997 04 16 14 57 4 12.4 -9 687.40 -49.0 -48.8 -49.1 73 -99 SPO 1997 04 16 14 58 3 12.2 -9 687.40 -49.0 -48.9 -49.2 74 -99 SPO 1997 04 16 14 59 3 12.1 -9 687.40 -49.1 -48.9 -49.1 74 -99 SPO 1997 04 16 15 00 3 12.3 -9 687.40 -49.0 -48.8 -49.1 74 0 SPO 1997 04 16 15 01 4 12.5 -9 687.40 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 15 02 3 13.7 -9 687.40 -48.9 -48.8 -48.9 75 -99 SPO 1997 04 16 15 03 3 13.4 -9 687.30 -48.9 -48.7 -48.9 75 -99 SPO 1997 04 16 15 04 3 13.1 -9 687.30 -48.8 -48.7 -48.9 75 -99 SPO 1997 04 16 15 05 4 12.8 -9 687.40 -48.8 -48.7 -48.9 74 -99 SPO 1997 04 16 15 06 4 13.2 -9 687.40 -48.8 -48.7 -48.9 74 -99 SPO 1997 04 16 15 07 3 12.8 -9 687.40 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 16 15 08 3 12.6 -9 687.40 -48.8 -48.8 -49.0 74 -99 SPO 1997 04 16 15 09 4 12.4 -9 687.50 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 15 10 4 12.2 -9 687.50 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 15 11 5 12.1 -9 687.50 -48.9 -48.8 -48.9 74 -99 SPO 1997 04 16 15 12 6 12.6 -9 687.60 -48.8 -48.8 -48.9 73 -99 SPO 1997 04 16 15 13 5 12.1 -9 687.50 -48.8 -48.8 -48.9 73 -99 SPO 1997 04 16 15 14 5 11.7 -9 687.50 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 16 15 15 5 12.4 -9 687.60 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 16 15 16 4 12.2 -9 687.50 -48.8 -48.8 -49.0 74 -99 SPO 1997 04 16 15 17 3 12.7 -9 687.50 -48.8 -48.8 -49.0 74 -99 SPO 1997 04 16 15 18 4 12.4 -9 687.50 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 16 15 19 5 11.7 -9 687.50 -48.8 -48.8 -49.0 73 -99 SPO 1997 04 16 15 20 7 11.6 -9 687.50 -48.8 -48.8 -49.0 72 -99 SPO 1997 04 16 15 21 7 11.5 -9 687.60 -48.8 -48.8 -49.0 71 -99 SPO 1997 04 16 15 22 7 11.8 -9 687.60 -48.8 -48.8 -49.0 71 -99 SPO 1997 04 16 15 23 7 12.1 -9 687.60 -48.8 -48.9 -49.0 71 -99 SPO 1997 04 16 15 24 9 11.8 -9 687.60 -48.9 -48.9 -49.0 73 -99 SPO 1997 04 16 15 25 8 12.3 -9 687.50 -48.9 -48.9 -49.0 73 -99 SPO 1997 04 16 15 26 8 11.9 -9 687.50 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 16 15 27 7 12.4 -9 687.50 -48.9 -48.9 -48.9 74 -99 SPO 1997 04 16 15 28 8 12.4 -9 687.50 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 16 15 29 5 12.2 -9 687.50 -48.8 -48.8 -48.9 73 -99 SPO 1997 04 16 15 30 7 12.0 -9 687.50 -48.8 -48.8 -48.9 72 -99 SPO 1997 04 16 15 31 6 12.3 -9 687.60 -48.8 -48.8 -49.0 71 -99 SPO 1997 04 16 15 32 8 12.3 -9 687.60 -48.8 -48.8 -49.0 70 -99 SPO 1997 04 16 15 33 9 11.6 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 34 8 11.7 -9 687.60 -48.9 -48.9 -49.0 69 -99 SPO 1997 04 16 15 35 10 12.2 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 36 8 12.6 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 37 7 12.9 -9 687.60 -48.9 -48.8 -49.0 72 -99 SPO 1997 04 16 15 38 7 12.0 -9 687.50 -48.9 -48.8 -49.0 72 -99 SPO 1997 04 16 15 39 6 12.7 -9 687.50 -48.9 -48.8 -49.0 71 -99 SPO 1997 04 16 15 40 5 13.3 -9 687.50 -48.9 -48.8 -49.0 71 -99 SPO 1997 04 16 15 41 5 12.7 -9 687.50 -48.8 -48.7 -48.9 69 -99 SPO 1997 04 16 15 42 6 13.4 -9 687.50 -48.9 -48.7 -49.0 70 -99 SPO 1997 04 16 15 43 5 12.3 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 44 5 11.1 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 45 7 12.4 -9 687.60 -48.9 -48.8 -49.0 69 -99 SPO 1997 04 16 15 46 8 12.7 -9 687.60 -48.8 -48.7 -48.9 69 -99 SPO 1997 04 16 15 47 8 12.6 -9 687.60 -48.8 -48.8 -49.0 69 -99 SPO 1997 04 16 15 48 9 12.3 -9 687.60 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 15 49 9 11.8 -9 687.60 -48.9 -48.9 -49.1 70 -99 SPO 1997 04 16 15 50 8 12.3 -9 687.60 -49.0 -48.9 -49.2 71 -99 SPO 1997 04 16 15 51 9 12.8 -9 687.60 -49.0 -48.9 -49.2 71 -99 SPO 1997 04 16 15 52 8 12.2 -9 687.60 -49.0 -48.9 -49.1 71 -99 SPO 1997 04 16 15 53 9 12.1 -9 687.70 -49.0 -48.9 -49.1 71 -99 SPO 1997 04 16 15 54 10 12.2 -9 687.70 -49.1 -48.9 -49.1 72 -99 SPO 1997 04 16 15 55 10 12.5 -9 687.70 -49.0 -48.8 -49.1 70 -99 SPO 1997 04 16 15 56 8 12.7 -9 687.70 -48.9 -48.7 -49.0 69 -99 SPO 1997 04 16 15 57 7 11.9 -9 687.80 -48.9 -48.7 -49.0 69 -99 SPO 1997 04 16 15 58 7 11.8 -9 687.80 -48.9 -48.7 -48.9 69 -99 SPO 1997 04 16 15 59 8 11.1 -9 687.90 -48.9 -48.7 -49.0 69 -99 SPO 1997 04 16 16 00 6 10.9 -9 687.90 -48.9 -48.8 -49.1 69 0 SPO 1997 04 16 16 01 5 10.8 -9 687.90 -49.0 -49.0 -49.2 69 -99 SPO 1997 04 16 16 02 6 10.4 -9 687.90 -49.0 -49.0 -49.2 69 -99 SPO 1997 04 16 16 03 5 10.5 -9 688.00 -49.0 -49.0 -49.2 69 -99 SPO 1997 04 16 16 04 7 10.7 -9 688.00 -49.1 -49.0 -49.2 71 -99 SPO 1997 04 16 16 05 7 10.9 -9 688.00 -49.1 -49.0 -49.2 71 -99 SPO 1997 04 16 16 06 6 11.8 -9 688.00 -49.0 -49.0 -49.1 69 -99 SPO 1997 04 16 16 07 5 11.5 -9 688.00 -49.0 -48.9 -49.1 69 -99 SPO 1997 04 16 16 08 7 10.9 -9 688.00 -49.0 -49.0 -49.1 69 -99 SPO 1997 04 16 16 09 9 10.7 -9 688.10 -49.1 -49.1 -49.3 68 -99 SPO 1997 04 16 16 10 8 10.5 -9 688.10 -49.1 -49.2 -49.4 68 -99 SPO 1997 04 16 16 11 8 10.4 -9 688.10 -49.2 -49.2 -49.5 68 -99 SPO 1997 04 16 16 12 9 9.7 -9 688.10 -49.3 -49.3 -49.5 69 -99 SPO 1997 04 16 16 13 8 10.4 -9 688.10 -49.3 -49.4 -49.6 69 -99 SPO 1997 04 16 16 14 7 11.6 -9 688.10 -49.3 -49.3 -49.5 69 -99 SPO 1997 04 16 16 15 4 11.9 -9 688.00 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 16 2 12.0 -9 688.00 -49.3 -49.1 -49.4 69 -99 SPO 1997 04 16 16 17 2 11.9 -9 688.00 -49.2 -49.0 -49.3 69 -99 SPO 1997 04 16 16 18 3 11.9 -9 688.00 -49.2 -49.0 -49.2 67 -99 SPO 1997 04 16 16 19 3 12.1 -9 688.00 -49.2 -49.1 -49.3 67 -99 SPO 1997 04 16 16 20 3 10.8 -9 688.00 -49.2 -49.2 -49.3 67 -99 SPO 1997 04 16 16 21 3 10.7 -9 688.10 -49.2 -49.2 -49.4 67 -99 SPO 1997 04 16 16 22 4 10.0 -9 688.20 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 16 16 23 5 10.7 -9 688.10 -49.3 -49.3 -49.4 68 -99 SPO 1997 04 16 16 24 6 11.6 -9 688.10 -49.3 -49.3 -49.4 69 -99 SPO 1997 04 16 16 25 5 11.2 -9 688.10 -49.3 -49.3 -49.4 69 -99 SPO 1997 04 16 16 26 5 10.9 -9 688.10 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 27 4 11.8 -9 688.10 -49.3 -49.2 -49.3 69 -99 SPO 1997 04 16 16 28 4 10.9 -9 688.10 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 29 4 10.5 -9 688.10 -49.3 -49.2 -49.4 71 -99 SPO 1997 04 16 16 30 4 10.5 -9 688.10 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 31 6 10.6 -9 688.10 -49.2 -49.3 -49.4 68 -99 SPO 1997 04 16 16 32 4 10.6 -9 688.10 -49.2 -49.2 -49.4 67 -99 SPO 1997 04 16 16 33 3 11.1 -9 688.20 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 16 34 3 11.5 -9 688.10 -49.3 -49.1 -49.3 68 -99 SPO 1997 04 16 16 35 1 11.8 -9 688.10 -49.2 -49.0 -49.2 67 -99 SPO 1997 04 16 16 36 3 10.8 -9 688.10 -49.2 -49.1 -49.3 67 -99 SPO 1997 04 16 16 37 3 11.2 -9 688.10 -49.2 -49.1 -49.4 67 -99 SPO 1997 04 16 16 38 5 11.7 -9 688.10 -49.3 -49.1 -49.3 69 -99 SPO 1997 04 16 16 39 6 10.7 -9 688.20 -49.2 -49.2 -49.4 68 -99 SPO 1997 04 16 16 40 3 11.8 -9 688.10 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 41 2 12.7 -9 688.10 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 16 42 0 12.8 -9 688.00 -49.3 -49.2 -49.3 68 -99 SPO 1997 04 16 16 43 359 12.5 -9 688.00 -49.3 -49.2 -49.3 67 -99 SPO 1997 04 16 16 44 1 12.1 -9 688.00 -49.3 -49.2 -49.4 67 -99 SPO 1997 04 16 16 45 1 11.2 -9 688.10 -49.3 -49.3 -49.5 67 -99 SPO 1997 04 16 16 46 5 11.2 -9 688.10 -49.4 -49.3 -49.5 69 -99 SPO 1997 04 16 16 47 2 11.0 -9 688.20 -49.4 -49.3 -49.5 69 -99 SPO 1997 04 16 16 48 5 11.1 -9 688.20 -49.4 -49.3 -49.6 69 -99 SPO 1997 04 16 16 49 5 11.2 -9 688.10 -49.3 -49.3 -49.5 68 -99 SPO 1997 04 16 16 50 5 12.1 -9 688.10 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 51 5 11.9 -9 688.00 -49.3 -49.2 -49.4 69 -99 SPO 1997 04 16 16 52 5 11.3 -9 688.00 -49.3 -49.1 -49.4 69 -99 SPO 1997 04 16 16 53 6 11.6 -9 688.10 -49.3 -49.1 -49.4 69 -99 SPO 1997 04 16 16 54 6 11.5 -9 688.10 -49.3 -49.1 -49.4 68 -99 SPO 1997 04 16 16 55 6 11.7 -9 688.10 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 16 56 5 11.5 -9 688.10 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 16 57 4 11.6 -9 688.20 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 16 58 3 11.2 -9 688.10 -49.3 -49.3 -49.4 68 -99 SPO 1997 04 16 16 59 6 12.3 -9 688.10 -49.3 -49.3 -49.4 69 -99 SPO 1997 04 16 17 00 4 12.0 -9 688.10 -49.3 -49.3 -49.4 69 0 SPO 1997 04 16 17 01 4 11.9 -9 688.00 -49.3 -49.3 -49.5 71 -99 SPO 1997 04 16 17 02 3 12.0 -9 688.10 -49.4 -49.3 -49.5 73 -99 SPO 1997 04 16 17 03 3 11.8 -9 688.10 -49.4 -49.3 -49.5 73 -99 SPO 1997 04 16 17 04 2 11.7 -9 688.10 -49.4 -49.2 -49.4 73 -99 SPO 1997 04 16 17 05 3 11.7 -9 688.10 -49.4 -49.2 -49.5 73 -99 SPO 1997 04 16 17 06 3 11.0 -9 688.20 -49.4 -49.2 -49.5 70 -99 SPO 1997 04 16 17 07 6 11.4 -9 688.20 -49.4 -49.2 -49.5 69 -99 SPO 1997 04 16 17 08 9 11.3 -9 688.20 -49.3 -49.2 -49.5 68 -99 SPO 1997 04 16 17 09 9 12.3 -9 688.20 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 17 10 9 12.2 -9 688.20 -49.3 -49.2 -49.4 68 -99 SPO 1997 04 16 17 11 6 13.1 -9 688.10 -49.3 -49.2 -49.5 69 -99 SPO 1997 04 16 17 12 3 12.7 -9 688.10 -49.4 -49.3 -49.6 70 -99 SPO 1997 04 16 17 13 0 13.8 -9 688.00 -49.4 -49.3 -49.5 70 -99 SPO 1997 04 16 17 14 1 13.6 -9 688.00 -49.4 -49.3 -49.5 -99 -99 SPO 1997 04 16 17 15 0 12.8 -9 688.10 -49.4 -49.3 -49.5 -99 -99 SPO 1997 04 16 17 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 16 17 17 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 16 17 18 -999 -99.9 -9 688.20 -49.4 -49.4 -49.6 -99 -99 SPO 1997 04 16 17 19 6 10.5 -9 688.30 -49.4 -49.4 -49.6 -99 -99 SPO 1997 04 16 17 20 10 11.2 -9 688.30 -49.5 -49.4 -49.6 70 -99 SPO 1997 04 16 17 21 9 11.7 -9 688.30 -49.5 -49.4 -49.5 70 -99 SPO 1997 04 16 17 22 7 12.3 -9 688.20 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 17 23 5 12.8 -9 688.20 -49.5 -49.5 -49.7 71 -99 SPO 1997 04 16 17 24 2 12.7 -9 688.10 -49.6 -49.6 -49.8 72 -99 SPO 1997 04 16 17 25 1 13.0 -9 688.10 -49.5 -49.6 -49.8 70 -99 SPO 1997 04 16 17 26 2 12.5 -9 688.10 -49.6 -49.5 -49.8 71 -99 SPO 1997 04 16 17 27 2 11.5 -9 688.20 -49.6 -49.6 -49.8 70 -99 SPO 1997 04 16 17 28 2 11.2 -9 688.20 -49.7 -49.6 -49.9 70 -99 SPO 1997 04 16 17 29 4 11.8 -9 688.30 -49.7 -49.5 -49.8 69 -99 SPO 1997 04 16 17 30 6 10.6 -9 688.30 -49.7 -49.5 -49.8 68 -99 SPO 1997 04 16 17 31 7 10.8 -9 688.30 -49.7 -49.5 -49.8 68 -99 SPO 1997 04 16 17 32 6 11.4 -9 688.30 -49.6 -49.5 -49.7 66 -99 SPO 1997 04 16 17 33 7 11.7 -9 688.20 -49.6 -49.5 -49.6 68 -99 SPO 1997 04 16 17 34 5 11.7 -9 688.30 -49.6 -49.5 -49.6 68 -99 SPO 1997 04 16 17 35 6 12.0 -9 688.30 -49.5 -49.5 -49.6 68 -99 SPO 1997 04 16 17 36 6 11.1 -9 688.30 -49.5 -49.5 -49.6 69 -99 SPO 1997 04 16 17 37 7 11.4 -9 688.30 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 17 38 4 12.0 -9 688.30 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 17 39 4 11.7 -9 688.30 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 17 40 6 11.0 -9 688.30 -49.6 -49.5 -49.7 72 -99 SPO 1997 04 16 17 41 6 12.5 -9 688.20 -49.6 -49.5 -49.7 71 -99 SPO 1997 04 16 17 42 2 12.3 -9 688.20 -49.6 -49.6 -49.7 70 -99 SPO 1997 04 16 17 43 3 13.1 -9 688.20 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 17 44 1 12.4 -9 688.10 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 17 45 1 12.5 -9 688.20 -49.6 -49.5 -49.7 68 -99 SPO 1997 04 16 17 46 3 11.9 -9 688.30 -49.5 -49.5 -49.6 68 -99 SPO 1997 04 16 17 47 4 11.7 -9 688.30 -49.5 -49.5 -49.7 68 -99 SPO 1997 04 16 17 48 7 11.7 -9 688.30 -49.5 -49.4 -49.6 68 -99 SPO 1997 04 16 17 49 7 11.4 -9 688.30 -49.5 -49.4 -49.5 68 -99 SPO 1997 04 16 17 50 8 11.3 -9 688.40 -49.4 -49.3 -49.5 68 -99 SPO 1997 04 16 17 51 8 12.6 -9 688.30 -49.4 -49.3 -49.4 69 -99 SPO 1997 04 16 17 52 6 13.2 -9 688.30 -49.4 -49.3 -49.3 70 -99 SPO 1997 04 16 17 53 5 13.2 -9 688.20 -49.3 -49.4 -49.4 71 -99 SPO 1997 04 16 17 54 5 12.8 -9 688.20 -49.3 -49.5 -49.5 69 -99 SPO 1997 04 16 17 55 2 12.6 -9 688.20 -49.4 -49.6 -49.6 70 -99 SPO 1997 04 16 17 56 5 11.9 -9 688.30 -49.5 -49.6 -49.7 69 -99 SPO 1997 04 16 17 57 6 12.6 -9 688.30 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 17 58 6 12.4 -9 688.40 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 17 59 6 11.7 -9 688.40 -49.5 -49.6 -49.6 69 -99 SPO 1997 04 16 18 00 8 11.4 -9 688.40 -49.5 -49.5 -49.6 69 0 SPO 1997 04 16 18 01 11 11.2 -9 688.50 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 18 02 8 11.9 -9 688.40 -49.4 -49.5 -49.6 69 -99 SPO 1997 04 16 18 03 7 13.2 -9 688.40 -49.4 -49.6 -49.8 69 -99 SPO 1997 04 16 18 04 5 13.2 -9 688.30 -49.6 -49.7 -49.8 70 -99 SPO 1997 04 16 18 05 2 13.3 -9 688.30 -49.6 -49.7 -49.9 69 -99 SPO 1997 04 16 18 06 2 13.1 -9 688.40 -49.6 -49.7 -49.8 68 -99 SPO 1997 04 16 18 07 2 12.4 -9 688.40 -49.7 -49.7 -49.8 68 -99 SPO 1997 04 16 18 08 3 12.4 -9 688.40 -49.7 -49.7 -49.8 68 -99 SPO 1997 04 16 18 09 5 12.3 -9 688.40 -49.6 -49.7 -49.7 68 -99 SPO 1997 04 16 18 10 6 11.8 -9 688.40 -49.7 -49.7 -49.8 69 -99 SPO 1997 04 16 18 11 5 11.2 -9 688.40 -49.6 -49.7 -49.7 69 -99 SPO 1997 04 16 18 12 5 12.0 -9 688.40 -49.6 -49.7 -49.7 69 -99 SPO 1997 04 16 18 13 4 12.1 -9 688.50 -49.6 -49.6 -49.6 70 -99 SPO 1997 04 16 18 14 4 11.8 -9 688.40 -49.6 -49.6 -49.6 70 -99 SPO 1997 04 16 18 15 5 12.1 -9 688.50 -49.5 -49.5 -49.5 70 -99 SPO 1997 04 16 18 16 1 12.3 -9 688.40 -49.5 -49.6 -49.6 71 -99 SPO 1997 04 16 18 17 2 12.4 -9 688.40 -49.6 -49.7 -49.8 71 -99 SPO 1997 04 16 18 18 3 12.9 -9 688.40 -49.6 -49.7 -49.8 70 -99 SPO 1997 04 16 18 19 4 12.9 -9 688.40 -49.5 -49.7 -49.7 68 -99 SPO 1997 04 16 18 20 5 12.6 -9 688.40 -49.6 -49.6 -49.7 68 -99 SPO 1997 04 16 18 21 4 12.0 -9 688.50 -49.6 -49.6 -49.7 68 -99 SPO 1997 04 16 18 22 5 12.0 -9 688.50 -49.5 -49.5 -49.7 69 -99 SPO 1997 04 16 18 23 4 12.2 -9 688.50 -49.5 -49.6 -49.7 69 -99 SPO 1997 04 16 18 24 4 12.2 -9 688.50 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 18 25 2 11.5 -9 688.40 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 18 26 3 11.8 -9 688.50 -49.5 -49.5 -49.6 70 -99 SPO 1997 04 16 18 27 5 11.6 -9 688.50 -49.5 -49.5 -49.5 71 -99 SPO 1997 04 16 18 28 5 11.0 -9 688.50 -49.4 -49.5 -49.5 70 -99 SPO 1997 04 16 18 29 4 12.0 -9 688.50 -49.4 -49.6 -49.6 69 -99 SPO 1997 04 16 18 30 4 11.4 -9 688.50 -49.4 -49.6 -49.6 69 -99 SPO 1997 04 16 18 31 5 11.6 -9 688.50 -49.5 -49.6 -49.6 68 -99 SPO 1997 04 16 18 32 7 11.7 -9 688.60 -49.5 -49.6 -49.6 68 -99 SPO 1997 04 16 18 33 5 12.8 -9 688.60 -49.5 -49.7 -49.7 68 -99 SPO 1997 04 16 18 34 5 12.2 -9 688.60 -49.6 -49.7 -49.7 68 -99 SPO 1997 04 16 18 35 4 12.0 -9 688.60 -49.6 -49.8 -49.8 70 -99 SPO 1997 04 16 18 36 4 12.2 -9 688.60 -49.6 -49.8 -49.8 70 -99 SPO 1997 04 16 18 37 6 12.0 -9 688.60 -49.6 -49.7 -49.8 69 -99 SPO 1997 04 16 18 38 6 11.6 -9 688.60 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 18 39 6 10.7 -9 688.60 -49.5 -49.6 -49.7 68 -99 SPO 1997 04 16 18 40 6 10.8 -9 688.70 -49.5 -49.5 -49.6 68 -99 SPO 1997 04 16 18 41 7 11.0 -9 688.70 -49.5 -49.4 -49.5 68 -99 SPO 1997 04 16 18 42 5 11.0 -9 688.70 -49.4 -49.4 -49.4 69 -99 SPO 1997 04 16 18 43 4 10.9 -9 688.70 -49.4 -49.3 -49.4 67 -99 SPO 1997 04 16 18 44 4 10.3 -9 688.70 -49.3 -49.4 -49.4 66 -99 SPO 1997 04 16 18 45 4 11.0 -9 688.60 -49.4 -49.5 -49.5 67 -99 SPO 1997 04 16 18 46 3 11.9 -9 688.60 -49.4 -49.6 -49.5 68 -99 SPO 1997 04 16 18 47 5 11.6 -9 688.70 -49.4 -49.6 -49.6 68 -99 SPO 1997 04 16 18 48 7 11.8 -9 688.70 -49.4 -49.6 -49.6 69 -99 SPO 1997 04 16 18 49 7 11.2 -9 688.70 -49.4 -49.6 -49.6 69 -99 SPO 1997 04 16 18 50 7 11.3 -9 688.70 -49.4 -49.6 -49.5 69 -99 SPO 1997 04 16 18 51 5 11.1 -9 688.70 -49.4 -49.6 -49.5 70 -99 SPO 1997 04 16 18 52 5 10.9 -9 688.80 -49.4 -49.5 -49.5 70 -99 SPO 1997 04 16 18 53 4 11.0 -9 688.70 -49.4 -49.5 -49.4 70 -99 SPO 1997 04 16 18 54 4 10.7 -9 688.80 -49.4 -49.4 -49.4 73 -99 SPO 1997 04 16 18 55 6 10.2 -9 688.80 -49.4 -49.4 -49.4 73 -99 SPO 1997 04 16 18 56 8 10.3 -9 688.80 -49.3 -49.4 -49.4 71 -99 SPO 1997 04 16 18 57 6 10.8 -9 688.80 -49.2 -49.4 -49.4 71 -99 SPO 1997 04 16 18 58 6 12.0 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 18 59 5 11.7 -9 688.70 -49.2 -49.3 -49.4 72 -99 SPO 1997 04 16 19 00 7 11.2 -9 688.80 -49.3 -49.3 -49.4 73 0 SPO 1997 04 16 19 01 8 11.4 -9 688.70 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 16 19 02 5 11.3 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 03 4 11.3 -9 688.70 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 04 4 11.1 -9 688.70 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 05 3 11.6 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 06 3 12.4 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 07 3 12.1 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 08 4 12.7 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 09 4 12.2 -9 688.70 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 16 19 10 4 11.8 -9 688.80 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 11 4 11.2 -9 688.80 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 16 19 12 4 11.2 -9 688.80 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 16 19 13 6 10.5 -9 688.80 -49.2 -49.2 -49.2 72 -99 SPO 1997 04 16 19 14 6 9.8 -9 688.80 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 16 19 15 6 11.7 -9 688.80 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 16 5 11.3 -9 688.80 -49.1 -49.3 -49.4 70 -99 SPO 1997 04 16 19 17 6 10.9 -9 688.80 -49.2 -49.3 -49.4 71 -99 SPO 1997 04 16 19 18 6 11.4 -9 688.90 -49.2 -49.3 -49.4 70 -99 SPO 1997 04 16 19 19 6 10.6 -9 688.80 -49.2 -49.3 -49.3 70 -99 SPO 1997 04 16 19 20 6 10.6 -9 688.80 -49.2 -49.3 -49.3 69 -99 SPO 1997 04 16 19 21 6 11.5 -9 688.80 -49.2 -49.3 -49.3 70 -99 SPO 1997 04 16 19 22 6 11.2 -9 688.80 -49.2 -49.3 -49.2 71 -99 SPO 1997 04 16 19 23 7 11.7 -9 688.80 -49.2 -49.3 -49.2 72 -99 SPO 1997 04 16 19 24 6 11.7 -9 688.80 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 25 6 11.8 -9 688.80 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 26 4 11.5 -9 688.70 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 16 19 27 4 11.5 -9 688.80 -49.2 -49.2 -49.2 72 -99 SPO 1997 04 16 19 28 5 11.2 -9 688.80 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 16 19 29 6 10.4 -9 688.80 -49.1 -49.2 -49.2 69 -99 SPO 1997 04 16 19 30 10 10.1 -9 688.90 -49.1 -49.2 -49.2 68 -99 SPO 1997 04 16 19 31 8 11.5 -9 688.80 -49.1 -49.2 -49.3 68 -99 SPO 1997 04 16 19 32 9 11.2 -9 688.80 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 19 33 8 11.5 -9 688.80 -49.2 -49.3 -49.4 69 -99 SPO 1997 04 16 19 34 7 11.4 -9 688.80 -49.1 -49.3 -49.3 68 -99 SPO 1997 04 16 19 35 6 11.8 -9 688.80 -49.2 -49.2 -49.3 70 -99 SPO 1997 04 16 19 36 6 11.3 -9 688.80 -49.2 -49.2 -49.3 71 -99 SPO 1997 04 16 19 37 4 11.3 -9 688.80 -49.2 -49.1 -49.2 71 -99 SPO 1997 04 16 19 38 4 10.8 -9 688.80 -49.1 -49.1 -49.2 69 -99 SPO 1997 04 16 19 39 7 10.5 -9 688.90 -49.1 -49.1 -49.2 68 -99 SPO 1997 04 16 19 40 7 10.1 -9 688.90 -49.1 -49.1 -49.2 69 -99 SPO 1997 04 16 19 41 9 10.8 -9 688.90 -49.1 -49.2 -49.2 68 -99 SPO 1997 04 16 19 42 9 11.0 -9 688.90 -49.1 -49.3 -49.3 67 -99 SPO 1997 04 16 19 43 9 10.8 -9 688.90 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 19 44 8 10.6 -9 688.90 -49.2 -49.3 -49.4 67 -99 SPO 1997 04 16 19 45 8 11.1 -9 688.90 -49.2 -49.3 -49.4 68 -99 SPO 1997 04 16 19 46 9 10.9 -9 688.90 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 19 47 9 11.2 -9 689.00 -49.2 -49.2 -49.3 69 -99 SPO 1997 04 16 19 48 10 10.3 -9 689.00 -49.2 -49.2 -49.3 69 -99 SPO 1997 04 16 19 49 11 10.0 -9 689.00 -49.2 -49.2 -49.3 69 -99 SPO 1997 04 16 19 50 11 10.3 -9 689.00 -49.2 -49.2 -49.3 69 -99 SPO 1997 04 16 19 51 11 10.9 -9 689.00 -49.2 -49.3 -49.3 69 -99 SPO 1997 04 16 19 52 11 11.0 -9 689.00 -49.2 -49.3 -49.4 69 -99 SPO 1997 04 16 19 53 11 10.7 -9 689.00 -49.2 -49.3 -49.4 68 -99 SPO 1997 04 16 19 54 11 10.4 -9 689.00 -49.2 -49.3 -49.4 67 -99 SPO 1997 04 16 19 55 10 10.7 -9 689.00 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 16 19 56 8 11.2 -9 689.00 -49.3 -49.3 -49.4 66 -99 SPO 1997 04 16 19 57 7 10.7 -9 689.00 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 16 19 58 8 10.8 -9 689.00 -49.3 -49.3 -49.4 68 -99 SPO 1997 04 16 19 59 8 10.4 -9 689.00 -49.3 -49.3 -49.4 68 -99 SPO 1997 04 16 20 00 9 9.9 -9 689.00 -49.3 -49.3 -49.3 69 0 SPO 1997 04 16 20 01 8 10.1 -9 689.00 -49.2 -49.3 -49.3 69 -99 SPO 1997 04 16 20 02 9 11.1 -9 689.00 -49.2 -49.3 -49.3 69 -99 SPO 1997 04 16 20 03 9 10.7 -9 689.00 -49.2 -49.3 -49.3 69 -99 SPO 1997 04 16 20 04 10 10.1 -9 689.10 -49.2 -49.3 -49.4 68 -99 SPO 1997 04 16 20 05 11 10.3 -9 689.10 -49.3 -49.4 -49.4 68 -99 SPO 1997 04 16 20 06 12 10.2 -9 689.20 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 16 20 07 12 9.9 -9 689.20 -49.3 -49.3 -49.4 66 -99 SPO 1997 04 16 20 08 11 9.3 -9 689.20 -49.3 -49.3 -49.4 66 -99 SPO 1997 04 16 20 09 8 10.1 -9 689.20 -49.3 -49.3 -49.3 68 -99 SPO 1997 04 16 20 10 7 10.2 -9 689.10 -49.2 -49.3 -49.3 67 -99 SPO 1997 04 16 20 11 6 10.6 -9 689.10 -49.2 -49.2 -49.3 67 -99 SPO 1997 04 16 20 12 6 10.4 -9 689.10 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 13 6 11.2 -9 689.10 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 14 6 10.8 -9 689.10 -49.2 -49.1 -49.2 69 -99 SPO 1997 04 16 20 15 9 9.8 -9 689.10 -49.1 -49.2 -49.2 68 -99 SPO 1997 04 16 20 16 13 9.9 -9 689.20 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 17 14 9.6 -9 689.20 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 20 18 13 10.6 -9 689.20 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 20 19 13 10.3 -9 689.20 -49.2 -49.3 -49.3 67 -99 SPO 1997 04 16 20 20 10 10.1 -9 689.10 -49.2 -49.4 -49.4 67 -99 SPO 1997 04 16 20 21 9 10.9 -9 689.20 -49.2 -49.3 -49.4 67 -99 SPO 1997 04 16 20 22 7 10.8 -9 689.10 -49.2 -49.3 -49.3 68 -99 SPO 1997 04 16 20 23 7 10.6 -9 689.10 -49.3 -49.3 -49.4 69 -99 SPO 1997 04 16 20 24 7 10.7 -9 689.10 -49.3 -49.3 -49.4 68 -99 SPO 1997 04 16 20 25 7 10.7 -9 689.10 -49.3 -49.3 -49.3 69 -99 SPO 1997 04 16 20 26 8 10.9 -9 689.10 -49.3 -49.3 -49.3 69 -99 SPO 1997 04 16 20 27 10 10.9 -9 689.10 -49.3 -49.2 -49.3 69 -99 SPO 1997 04 16 20 28 10 10.8 -9 689.10 -49.2 -49.2 -49.3 69 -99 SPO 1997 04 16 20 29 10 10.9 -9 689.10 -49.1 -49.2 -49.3 67 -99 SPO 1997 04 16 20 30 10 10.9 -9 689.10 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 31 9 10.8 -9 689.10 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 32 9 10.5 -9 689.10 -49.2 -49.2 -49.3 68 -99 SPO 1997 04 16 20 33 8 11.0 -9 689.10 -49.2 -49.2 -49.2 68 -99 SPO 1997 04 16 20 34 8 11.1 -9 689.10 -49.2 -49.2 -49.2 69 -99 SPO 1997 04 16 20 35 8 10.5 -9 689.10 -49.2 -49.2 -49.2 70 -99 SPO 1997 04 16 20 36 7 10.8 -9 689.00 -49.1 -49.2 -49.2 70 -99 SPO 1997 04 16 20 37 6 11.1 -9 689.10 -49.1 -49.2 -49.2 70 -99 SPO 1997 04 16 20 38 6 11.3 -9 689.00 -49.1 -49.2 -49.2 71 -99 SPO 1997 04 16 20 39 7 11.0 -9 689.00 -49.1 -49.2 -49.2 70 -99 SPO 1997 04 16 20 40 7 11.4 -9 689.00 -49.1 -49.2 -49.2 69 -99 SPO 1997 04 16 20 41 7 11.5 -9 689.00 -49.1 -49.2 -49.2 69 -99 SPO 1997 04 16 20 42 6 11.8 -9 689.00 -49.1 -49.2 -49.2 69 -99 SPO 1997 04 16 20 43 7 11.2 -9 689.00 -49.1 -49.2 -49.3 69 -99 SPO 1997 04 16 20 44 5 11.5 -9 689.00 -49.2 -49.2 -49.3 70 -99 SPO 1997 04 16 20 45 5 11.7 -9 689.10 -49.2 -49.1 -49.2 70 -99 SPO 1997 04 16 20 46 5 11.1 -9 689.10 -49.1 -49.1 -49.2 70 -99 SPO 1997 04 16 20 47 4 11.2 -9 689.10 -49.1 -49.1 -49.2 71 -99 SPO 1997 04 16 20 48 5 11.5 -9 689.00 -49.0 -49.0 -49.1 70 -99 SPO 1997 04 16 20 49 3 11.8 -9 689.00 -49.0 -49.0 -49.1 71 -99 SPO 1997 04 16 20 50 4 12.1 -9 689.00 -49.0 -48.9 -49.1 71 -99 SPO 1997 04 16 20 51 5 11.0 -9 689.00 -49.0 -49.0 -49.1 71 -99 SPO 1997 04 16 20 52 5 11.4 -9 689.00 -49.0 -49.1 -49.2 69 -99 SPO 1997 04 16 20 53 5 11.1 -9 689.10 -49.1 -49.1 -49.2 70 -99 SPO 1997 04 16 20 54 5 11.7 -9 689.10 -49.1 -49.1 -49.2 70 -99 SPO 1997 04 16 20 55 5 12.3 -9 689.10 -49.1 -49.1 -49.2 70 -99 SPO 1997 04 16 20 56 4 11.8 -9 689.10 -49.1 -49.1 -49.2 71 -99 SPO 1997 04 16 20 57 3 11.4 -9 689.20 -49.1 -49.2 -49.2 72 -99 SPO 1997 04 16 20 58 3 11.5 -9 689.20 -49.1 -49.2 -49.2 73 -99 SPO 1997 04 16 20 59 3 11.8 -9 689.20 -49.1 -49.1 -49.2 74 -99 SPO 1997 04 16 21 00 3 11.7 -9 689.20 -49.1 -49.1 -49.2 74 0 SPO 1997 04 16 21 01 3 11.8 -9 689.10 -49.1 -49.1 -49.1 74 -99 SPO 1997 04 16 21 02 3 11.1 -9 689.20 -49.1 -49.1 -49.1 74 -99 SPO 1997 04 16 21 03 3 11.9 -9 689.10 -49.0 -49.0 -49.1 71 -99 SPO 1997 04 16 21 04 4 10.8 -9 689.20 -49.0 -49.0 -49.1 71 -99 SPO 1997 04 16 21 05 4 12.0 -9 689.20 -49.0 -49.0 -49.0 71 -99 SPO 1997 04 16 21 06 4 11.9 -9 689.20 -48.9 -48.9 -49.0 70 -99 SPO 1997 04 16 21 07 4 11.7 -9 689.20 -48.9 -48.9 -49.0 70 -99 SPO 1997 04 16 21 08 5 12.4 -9 689.10 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 16 21 09 6 12.1 -9 689.10 -48.9 -48.9 -49.0 71 -99 SPO 1997 04 16 21 10 4 11.6 -9 689.20 -48.9 -48.9 -49.1 71 -99 SPO 1997 04 16 21 11 4 11.9 -9 689.20 -48.9 -49.0 -49.1 71 -99 SPO 1997 04 16 21 12 4 11.9 -9 689.30 -48.9 -49.0 -49.0 71 -99 SPO 1997 04 16 21 13 5 11.6 -9 689.30 -48.9 -49.0 -49.0 72 -99 SPO 1997 04 16 21 14 5 11.7 -9 689.20 -48.9 -49.0 -49.0 72 -99 SPO 1997 04 16 21 15 5 11.1 -9 689.30 -48.9 -49.0 -49.0 71 -99 SPO 1997 04 16 21 16 6 11.4 -9 689.30 -48.9 -49.0 -49.0 70 -99 SPO 1997 04 16 21 17 6 12.4 -9 689.20 -48.9 -48.9 -49.0 70 -99 SPO 1997 04 16 21 18 5 11.8 -9 689.20 -48.9 -48.9 -48.9 70 -99 SPO 1997 04 16 21 19 4 12.4 -9 689.20 -48.9 -48.9 -49.0 70 -99 SPO 1997 04 16 21 20 5 12.1 -9 689.20 -48.9 -48.8 -48.9 71 -99 SPO 1997 04 16 21 21 4 11.2 -9 689.20 -48.9 -48.9 -49.0 71 -99 SPO 1997 04 16 21 22 4 12.0 -9 689.20 -48.9 -48.8 -49.0 71 -99 SPO 1997 04 16 21 23 3 12.8 -9 689.20 -48.9 -48.8 -48.9 71 -99 SPO 1997 04 16 21 24 4 12.1 -9 689.20 -48.8 -48.8 -48.9 71 -99 SPO 1997 04 16 21 25 3 12.0 -9 689.20 -48.8 -48.8 -48.9 71 -99 SPO 1997 04 16 21 26 2 12.5 -9 689.20 -48.8 -48.8 -48.9 71 -99 SPO 1997 04 16 21 27 3 12.9 -9 689.20 -48.8 -48.7 -48.8 70 -99 SPO 1997 04 16 21 28 3 12.5 -9 689.20 -48.7 -48.7 -48.9 69 -99 SPO 1997 04 16 21 29 5 12.0 -9 689.20 -48.8 -48.8 -48.9 69 -99 SPO 1997 04 16 21 30 6 11.7 -9 689.20 -48.8 -48.9 -49.0 69 -99 SPO 1997 04 16 21 31 6 11.8 -9 689.20 -48.8 -48.9 -49.0 69 -99 SPO 1997 04 16 21 32 5 12.2 -9 689.20 -48.8 -48.9 -49.0 69 -99 SPO 1997 04 16 21 33 3 12.6 -9 689.20 -48.8 -48.9 -49.0 71 -99 SPO 1997 04 16 21 34 4 13.4 -9 689.20 -48.8 -48.9 -49.0 71 -99 SPO 1997 04 16 21 35 4 13.0 -9 689.20 -48.9 -48.9 -49.0 72 -99 SPO 1997 04 16 21 36 3 12.7 -9 689.20 -48.9 -48.9 -48.9 73 -99 SPO 1997 04 16 21 37 3 12.4 -9 689.20 -48.9 -48.9 -49.0 72 -99 SPO 1997 04 16 21 38 3 12.9 -9 689.10 -48.8 -48.8 -48.9 71 -99 SPO 1997 04 16 21 39 2 13.8 -9 689.10 -48.8 -48.7 -48.8 70 -99 SPO 1997 04 16 21 40 2 13.2 -9 689.10 -48.7 -48.7 -48.8 69 -99 SPO 1997 04 16 21 41 2 12.8 -9 689.10 -48.7 -48.6 -48.8 69 -99 SPO 1997 04 16 21 42 1 13.1 -9 689.10 -48.7 -48.6 -48.8 69 -99 SPO 1997 04 16 21 43 0 13.7 -9 689.00 -48.7 -48.6 -48.8 69 -99 SPO 1997 04 16 21 44 0 14.1 -9 689.00 -48.6 -48.6 -48.8 70 -99 SPO 1997 04 16 21 45 2 13.6 -9 689.00 -48.6 -48.6 -48.8 70 -99 SPO 1997 04 16 21 46 3 13.1 -9 689.10 -48.6 -48.6 -48.8 70 -99 SPO 1997 04 16 21 47 4 12.5 -9 689.10 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 48 5 13.1 -9 689.10 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 49 3 13.2 -9 689.10 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 50 3 12.9 -9 689.10 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 51 3 12.7 -9 689.20 -48.7 -48.8 -48.8 69 -99 SPO 1997 04 16 21 52 3 12.6 -9 689.20 -48.7 -48.7 -48.8 69 -99 SPO 1997 04 16 21 53 4 12.9 -9 689.20 -48.7 -48.8 -48.8 69 -99 SPO 1997 04 16 21 54 5 12.5 -9 689.30 -48.7 -48.8 -48.8 69 -99 SPO 1997 04 16 21 55 4 12.3 -9 689.20 -48.7 -48.8 -48.9 69 -99 SPO 1997 04 16 21 56 4 12.4 -9 689.20 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 57 3 13.3 -9 689.20 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 21 58 2 13.2 -9 689.20 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 21 59 2 12.8 -9 689.20 -48.7 -48.7 -48.8 72 -99 SPO 1997 04 16 22 00 3 12.5 -9 689.20 -48.7 -48.7 -48.8 71 0 SPO 1997 04 16 22 01 3 12.9 -9 689.20 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 22 02 2 13.2 -9 689.20 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 22 03 3 12.7 -9 689.30 -48.6 -48.7 -48.8 70 -99 SPO 1997 04 16 22 04 3 12.7 -9 689.30 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 05 3 13.1 -9 689.30 -48.6 -48.7 -48.8 69 -99 SPO 1997 04 16 22 06 3 12.6 -9 689.30 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 07 3 12.8 -9 689.30 -48.7 -48.8 -48.8 71 -99 SPO 1997 04 16 22 08 2 12.6 -9 689.30 -48.7 -48.8 -48.8 72 -99 SPO 1997 04 16 22 09 3 12.5 -9 689.40 -48.7 -48.8 -48.8 72 -99 SPO 1997 04 16 22 10 5 12.3 -9 689.40 -48.7 -48.8 -48.8 72 -99 SPO 1997 04 16 22 11 5 12.2 -9 689.30 -48.7 -48.8 -48.8 72 -99 SPO 1997 04 16 22 12 4 13.1 -9 689.20 -48.7 -48.8 -48.8 73 -99 SPO 1997 04 16 22 13 4 13.4 -9 689.20 -48.7 -48.8 -48.8 72 -99 SPO 1997 04 16 22 14 4 13.1 -9 689.20 -48.7 -48.8 -48.8 71 -99 SPO 1997 04 16 22 15 3 13.4 -9 689.20 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 16 3 13.6 -9 689.20 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 17 4 13.2 -9 689.20 -48.7 -48.6 -48.8 69 -99 SPO 1997 04 16 22 18 4 12.8 -9 689.30 -48.7 -48.6 -48.8 69 -99 SPO 1997 04 16 22 19 5 13.0 -9 689.30 -48.7 -48.6 -48.8 70 -99 SPO 1997 04 16 22 20 6 12.8 -9 689.40 -48.7 -48.6 -48.7 71 -99 SPO 1997 04 16 22 21 8 12.3 -9 689.40 -48.6 -48.6 -48.8 70 -99 SPO 1997 04 16 22 22 9 12.5 -9 689.40 -48.6 -48.7 -48.8 70 -99 SPO 1997 04 16 22 23 8 12.9 -9 689.40 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 22 24 8 12.8 -9 689.30 -48.7 -48.7 -48.9 70 -99 SPO 1997 04 16 22 25 7 12.4 -9 689.40 -48.7 -48.8 -48.9 71 -99 SPO 1997 04 16 22 26 5 12.7 -9 689.40 -48.8 -48.8 -48.9 72 -99 SPO 1997 04 16 22 27 5 13.0 -9 689.30 -48.7 -48.8 -48.8 71 -99 SPO 1997 04 16 22 28 5 13.6 -9 689.30 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 29 5 13.2 -9 689.40 -48.7 -48.7 -48.8 70 -99 SPO 1997 04 16 22 30 5 12.9 -9 689.40 -48.7 -48.8 -48.8 70 -99 SPO 1997 04 16 22 31 6 13.7 -9 689.40 -48.7 -48.7 -48.8 72 -99 SPO 1997 04 16 22 32 6 13.0 -9 689.40 -48.7 -48.7 -48.7 73 -99 SPO 1997 04 16 22 33 6 12.6 -9 689.40 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 16 22 34 6 12.7 -9 689.40 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 16 22 35 6 12.2 -9 689.40 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 16 22 36 6 12.5 -9 689.40 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 16 22 37 5 13.2 -9 689.40 -48.7 -48.7 -48.8 72 -99 SPO 1997 04 16 22 38 5 12.9 -9 689.40 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 22 39 4 13.3 -9 689.40 -48.7 -48.7 -48.8 71 -99 SPO 1997 04 16 22 40 3 12.9 -9 689.40 -48.6 -48.7 -48.8 70 -99 SPO 1997 04 16 22 41 3 13.1 -9 689.40 -48.6 -48.6 -48.7 70 -99 SPO 1997 04 16 22 42 4 13.5 -9 689.40 -48.6 -48.5 -48.6 70 -99 SPO 1997 04 16 22 43 4 13.4 -9 689.40 -48.6 -48.5 -48.6 70 -99 SPO 1997 04 16 22 44 5 12.7 -9 689.40 -48.5 -48.6 -48.6 70 -99 SPO 1997 04 16 22 45 6 13.2 -9 689.40 -48.5 -48.6 -48.6 71 -99 SPO 1997 04 16 22 46 5 12.8 -9 689.40 -48.5 -48.6 -48.6 72 -99 SPO 1997 04 16 22 47 5 12.6 -9 689.40 -48.5 -48.6 -48.6 72 -99 SPO 1997 04 16 22 48 5 12.1 -9 689.50 -48.5 -48.6 -48.6 72 -99 SPO 1997 04 16 22 49 8 12.6 -9 689.40 -48.5 -48.6 -48.6 72 -99 SPO 1997 04 16 22 50 6 12.6 -9 689.50 -48.5 -48.6 -48.6 71 -99 SPO 1997 04 16 22 51 4 12.2 -9 689.50 -48.5 -48.6 -48.6 70 -99 SPO 1997 04 16 22 52 4 12.3 -9 689.50 -48.5 -48.6 -48.7 70 -99 SPO 1997 04 16 22 53 4 12.6 -9 689.50 -48.5 -48.5 -48.6 70 -99 SPO 1997 04 16 22 54 3 12.6 -9 689.50 -48.5 -48.5 -48.6 70 -99 SPO 1997 04 16 22 55 3 12.3 -9 689.60 -48.5 -48.5 -48.6 71 -99 SPO 1997 04 16 22 56 4 12.6 -9 689.60 -48.5 -48.5 -48.6 72 -99 SPO 1997 04 16 22 57 3 12.0 -9 689.60 -48.5 -48.5 -48.6 72 -99 SPO 1997 04 16 22 58 4 12.3 -9 689.60 -48.5 -48.5 -48.6 73 -99 SPO 1997 04 16 22 59 4 11.4 -9 689.60 -48.4 -48.5 -48.6 72 -99 SPO 1997 04 16 23 00 4 12.9 -9 689.60 -48.4 -48.5 -48.6 71 0 SPO 1997 04 16 23 01 4 12.1 -9 689.60 -48.5 -48.5 -48.6 72 -99 SPO 1997 04 16 23 02 5 12.0 -9 689.60 -48.5 -48.5 -48.6 71 -99 SPO 1997 04 16 23 03 4 12.0 -9 689.70 -48.5 -48.5 -48.6 70 -99 SPO 1997 04 16 23 04 5 12.2 -9 689.70 -48.4 -48.5 -48.5 70 -99 SPO 1997 04 16 23 05 5 12.1 -9 689.70 -48.4 -48.5 -48.5 69 -99 SPO 1997 04 16 23 06 3 12.8 -9 689.70 -48.4 -48.5 -48.5 70 -99 SPO 1997 04 16 23 07 4 13.4 -9 689.70 -48.4 -48.5 -48.5 70 -99 SPO 1997 04 16 23 08 4 13.3 -9 689.70 -48.4 -48.5 -48.5 71 -99 SPO 1997 04 16 23 09 3 13.0 -9 689.70 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 10 3 13.0 -9 689.70 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 11 2 12.9 -9 689.70 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 12 3 12.4 -9 689.70 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 13 4 12.1 -9 689.80 -48.4 -48.3 -48.5 71 -99 SPO 1997 04 16 23 14 5 12.9 -9 689.70 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 16 23 15 3 13.4 -9 689.70 -48.3 -48.3 -48.5 70 -99 SPO 1997 04 16 23 16 1 13.0 -9 689.70 -48.4 -48.3 -48.5 70 -99 SPO 1997 04 16 23 17 1 12.2 -9 689.70 -48.4 -48.3 -48.5 70 -99 SPO 1997 04 16 23 18 4 11.9 -9 689.70 -48.4 -48.3 -48.5 70 -99 SPO 1997 04 16 23 19 3 12.5 -9 689.70 -48.4 -48.3 -48.5 70 -99 SPO 1997 04 16 23 20 2 12.6 -9 689.70 -48.4 -48.4 -48.5 70 -99 SPO 1997 04 16 23 21 3 12.5 -9 689.70 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 22 3 12.5 -9 689.70 -48.4 -48.4 -48.5 72 -99 SPO 1997 04 16 23 23 2 13.2 -9 689.70 -48.4 -48.4 -48.5 72 -99 SPO 1997 04 16 23 24 2 12.8 -9 689.70 -48.4 -48.4 -48.5 72 -99 SPO 1997 04 16 23 25 3 12.9 -9 689.70 -48.4 -48.4 -48.4 73 -99 SPO 1997 04 16 23 26 1 12.9 -9 689.80 -48.4 -48.3 -48.4 72 -99 SPO 1997 04 16 23 27 0 12.6 -9 689.80 -48.3 -48.3 -48.4 72 -99 SPO 1997 04 16 23 28 1 13.2 -9 689.80 -48.3 -48.2 -48.3 71 -99 SPO 1997 04 16 23 29 2 12.5 -9 689.70 -48.3 -48.2 -48.3 72 -99 SPO 1997 04 16 23 30 4 12.6 -9 689.80 -48.2 -48.2 -48.3 71 -99 SPO 1997 04 16 23 31 4 12.8 -9 689.80 -48.2 -48.1 -48.3 72 -99 SPO 1997 04 16 23 32 4 13.1 -9 689.80 -48.2 -48.2 -48.3 73 -99 SPO 1997 04 16 23 33 2 12.4 -9 689.90 -48.2 -48.2 -48.3 74 -99 SPO 1997 04 16 23 34 1 12.4 -9 689.80 -48.2 -48.2 -48.4 73 -99 SPO 1997 04 16 23 35 0 12.1 -9 689.90 -48.3 -48.3 -48.4 74 -99 SPO 1997 04 16 23 36 2 11.9 -9 689.90 -48.3 -48.3 -48.4 73 -99 SPO 1997 04 16 23 37 2 12.1 -9 690.00 -48.3 -48.3 -48.4 72 -99 SPO 1997 04 16 23 38 3 11.6 -9 690.00 -48.3 -48.4 -48.4 71 -99 SPO 1997 04 16 23 39 3 12.1 -9 690.00 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 16 23 40 3 11.7 -9 690.00 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 16 23 41 3 12.1 -9 690.00 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 16 23 42 3 11.6 -9 690.00 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 16 23 43 3 12.2 -9 690.00 -48.3 -48.4 -48.4 71 -99 SPO 1997 04 16 23 44 3 12.3 -9 690.00 -48.3 -48.4 -48.4 71 -99 SPO 1997 04 16 23 45 2 12.3 -9 690.00 -48.4 -48.4 -48.5 73 -99 SPO 1997 04 16 23 46 3 12.4 -9 690.00 -48.4 -48.4 -48.5 74 -99 SPO 1997 04 16 23 47 3 12.4 -9 690.10 -48.4 -48.4 -48.5 73 -99 SPO 1997 04 16 23 48 3 11.4 -9 690.00 -48.4 -48.4 -48.5 73 -99 SPO 1997 04 16 23 49 3 11.8 -9 690.00 -48.4 -48.4 -48.5 72 -99 SPO 1997 04 16 23 50 1 12.1 -9 690.00 -48.4 -48.4 -48.5 71 -99 SPO 1997 04 16 23 51 2 12.2 -9 690.10 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 16 23 52 1 11.8 -9 690.00 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 16 23 53 359 12.5 -9 690.00 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 16 23 54 360 12.0 -9 690.00 -48.3 -48.2 -48.3 70 -99 SPO 1997 04 16 23 55 1 12.7 -9 690.00 -48.3 -48.2 -48.3 70 -99 SPO 1997 04 16 23 56 1 12.3 -9 690.00 -48.2 -48.2 -48.3 70 -99 SPO 1997 04 16 23 57 2 12.7 -9 690.00 -48.2 -48.3 -48.3 70 -99 SPO 1997 04 16 23 58 1 12.5 -9 690.00 -48.2 -48.3 -48.4 -99 -99 SPO 1997 04 16 23 59 1 12.0 -9 690.00 -48.2 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 00 -999 -99.9 -9 690.00 -48.3 -48.3 -48.4 -99 0 SPO 1997 04 17 00 01 2 12.1 -9 690.00 -48.2 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 02 3 12.1 -9 690.00 -48.2 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 03 3 12.6 -9 690.10 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 04 3 12.6 -9 690.00 -48.2 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 05 1 13.2 -9 690.00 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 06 1 12.3 -9 690.00 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 07 0 12.4 -9 690.00 -48.3 -48.4 -48.5 -99 -99 SPO 1997 04 17 00 08 360 12.8 -9 690.10 -48.3 -48.4 -48.5 -99 -99 SPO 1997 04 17 00 09 359 12.3 -9 690.10 -48.3 -48.3 -48.5 -99 -99 SPO 1997 04 17 00 10 360 12.6 -9 690.10 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 11 1 12.3 -9 690.10 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 12 3 12.0 -9 690.10 -48.3 -48.3 -48.4 -99 -99 SPO 1997 04 17 00 13 3 11.8 -9 690.10 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 17 00 14 2 12.3 -9 690.20 -48.3 -48.3 -48.4 69 -99 SPO 1997 04 17 00 15 2 11.9 -9 690.20 -48.3 -48.3 -48.4 69 -99 SPO 1997 04 17 00 16 1 12.1 -9 690.20 -48.3 -48.4 -48.4 69 -99 SPO 1997 04 17 00 17 2 11.2 -9 690.20 -48.3 -48.4 -48.4 69 -99 SPO 1997 04 17 00 18 1 11.8 -9 690.20 -48.3 -48.4 -48.4 69 -99 SPO 1997 04 17 00 19 2 11.6 -9 690.20 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 17 00 20 4 12.1 -9 690.30 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 17 00 21 4 11.7 -9 690.30 -48.3 -48.4 -48.4 71 -99 SPO 1997 04 17 00 22 4 11.6 -9 690.30 -48.3 -48.4 -48.4 72 -99 SPO 1997 04 17 00 23 3 11.7 -9 690.30 -48.3 -48.4 -48.4 72 -99 SPO 1997 04 17 00 24 3 11.6 -9 690.30 -48.3 -48.4 -48.4 72 -99 SPO 1997 04 17 00 25 2 11.8 -9 690.30 -48.3 -48.4 -48.4 72 -99 SPO 1997 04 17 00 26 3 11.4 -9 690.30 -48.3 -48.4 -48.4 71 -99 SPO 1997 04 17 00 27 4 11.2 -9 690.20 -48.3 -48.4 -48.4 70 -99 SPO 1997 04 17 00 28 4 11.4 -9 690.20 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 17 00 29 4 11.6 -9 690.20 -48.3 -48.3 -48.4 69 -99 SPO 1997 04 17 00 30 4 11.3 -9 690.30 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 17 00 31 4 11.6 -9 690.20 -48.3 -48.3 -48.4 70 -99 SPO 1997 04 17 00 32 5 11.5 -9 690.20 -48.3 -48.2 -48.3 71 -99 SPO 1997 04 17 00 33 4 11.7 -9 690.20 -48.2 -48.2 -48.3 71 -99 SPO 1997 04 17 00 34 3 11.3 -9 690.30 -48.2 -48.2 -48.3 71 -99 SPO 1997 04 17 00 35 4 11.0 -9 690.30 -48.2 -48.3 -48.3 72 -99 SPO 1997 04 17 00 36 3 11.3 -9 690.30 -48.2 -48.3 -48.3 72 -99 SPO 1997 04 17 00 37 3 11.5 -9 690.30 -48.2 -48.2 -48.3 73 -99 SPO 1997 04 17 00 38 4 11.6 -9 690.40 -48.2 -48.2 -48.3 72 -99 SPO 1997 04 17 00 39 4 11.3 -9 690.40 -48.2 -48.3 -48.3 71 -99 SPO 1997 04 17 00 40 3 11.7 -9 690.40 -48.2 -48.2 -48.3 70 -99 SPO 1997 04 17 00 41 2 11.0 -9 690.40 -48.2 -48.2 -48.3 69 -99 SPO 1997 04 17 00 42 2 11.1 -9 690.40 -48.2 -48.2 -48.3 69 -99 SPO 1997 04 17 00 43 1 10.3 -9 690.40 -48.2 -48.3 -48.3 70 -99 SPO 1997 04 17 00 44 1 10.7 -9 690.40 -48.2 -48.3 -48.3 70 -99 SPO 1997 04 17 00 45 1 10.6 -9 690.40 -48.2 -48.3 -48.3 70 -99 SPO 1997 04 17 00 46 3 11.1 -9 690.40 -48.2 -48.3 -48.3 71 -99 SPO 1997 04 17 00 47 3 11.3 -9 690.40 -48.2 -48.3 -48.3 71 -99 SPO 1997 04 17 00 48 3 11.0 -9 690.30 -48.2 -48.3 -48.3 71 -99 SPO 1997 04 17 00 49 3 11.8 -9 690.40 -48.2 -48.2 -48.3 71 -99 SPO 1997 04 17 00 50 1 11.4 -9 690.30 -48.2 -48.2 -48.2 70 -99 SPO 1997 04 17 00 51 2 11.6 -9 690.30 -48.2 -48.2 -48.2 70 -99 SPO 1997 04 17 00 52 0 11.7 -9 690.30 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 17 00 53 1 11.2 -9 690.30 -48.1 -48.2 -48.1 69 -99 SPO 1997 04 17 00 54 2 10.7 -9 690.30 -48.1 -48.2 -48.1 70 -99 SPO 1997 04 17 00 55 3 11.1 -9 690.40 -48.0 -48.2 -48.1 70 -99 SPO 1997 04 17 00 56 3 11.6 -9 690.40 -48.0 -48.1 -48.0 70 -99 SPO 1997 04 17 00 57 2 11.5 -9 690.40 -47.9 -48.1 -48.0 70 -99 SPO 1997 04 17 00 58 2 11.6 -9 690.40 -47.9 -48.0 -48.0 72 -99 SPO 1997 04 17 00 59 2 11.3 -9 690.40 -47.9 -48.0 -47.9 72 -99 SPO 1997 04 17 01 00 1 11.2 -9 690.40 -47.9 -48.0 -47.9 72 0 SPO 1997 04 17 01 01 0 11.2 -9 690.40 -47.9 -47.9 -47.9 74 -99 SPO 1997 04 17 01 02 360 11.4 -9 690.40 -47.8 -47.9 -47.9 73 -99 SPO 1997 04 17 01 03 359 12.1 -9 690.40 -47.8 -47.9 -47.9 72 -99 SPO 1997 04 17 01 04 357 11.6 -9 690.40 -47.8 -47.8 -47.9 72 -99 SPO 1997 04 17 01 05 357 11.4 -9 690.40 -47.7 -47.8 -47.9 71 -99 SPO 1997 04 17 01 06 358 11.8 -9 690.40 -47.7 -47.8 -47.8 71 -99 SPO 1997 04 17 01 07 358 11.1 -9 690.40 -47.7 -47.7 -47.8 72 -99 SPO 1997 04 17 01 08 359 12.0 -9 690.40 -47.7 -47.7 -47.7 73 -99 SPO 1997 04 17 01 09 359 11.7 -9 690.40 -47.6 -47.7 -47.7 73 -99 SPO 1997 04 17 01 10 360 11.9 -9 690.40 -47.6 -47.6 -47.7 74 -99 SPO 1997 04 17 01 11 1 11.5 -9 690.40 -47.6 -47.6 -47.7 73 -99 SPO 1997 04 17 01 12 0 11.6 -9 690.40 -47.6 -47.7 -47.7 73 -99 SPO 1997 04 17 01 13 2 11.2 -9 690.40 -47.6 -47.7 -47.7 73 -99 SPO 1997 04 17 01 14 2 12.1 -9 690.40 -47.5 -47.7 -47.6 72 -99 SPO 1997 04 17 01 15 1 11.5 -9 690.40 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 16 2 11.8 -9 690.30 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 17 3 12.5 -9 690.30 -47.5 -47.6 -47.6 71 -99 SPO 1997 04 17 01 18 3 12.7 -9 690.30 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 19 3 12.2 -9 690.30 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 20 3 12.4 -9 690.30 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 21 4 12.3 -9 690.20 -47.5 -47.5 -47.6 73 -99 SPO 1997 04 17 01 22 3 12.2 -9 690.20 -47.5 -47.5 -47.6 73 -99 SPO 1997 04 17 01 23 2 12.2 -9 690.20 -47.4 -47.5 -47.6 72 -99 SPO 1997 04 17 01 24 2 12.3 -9 690.20 -47.5 -47.5 -47.6 72 -99 SPO 1997 04 17 01 25 3 12.3 -9 690.20 -47.4 -47.5 -47.6 71 -99 SPO 1997 04 17 01 26 2 12.2 -9 690.20 -47.5 -47.5 -47.6 72 -99 SPO 1997 04 17 01 27 2 12.0 -9 690.20 -47.5 -47.5 -47.6 71 -99 SPO 1997 04 17 01 28 1 11.9 -9 690.30 -47.5 -47.4 -47.6 71 -99 SPO 1997 04 17 01 29 2 12.5 -9 690.20 -47.4 -47.4 -47.5 69 -99 SPO 1997 04 17 01 30 0 12.9 -9 690.20 -47.4 -47.4 -47.5 69 -99 SPO 1997 04 17 01 31 1 12.7 -9 690.20 -47.4 -47.5 -47.5 70 -99 SPO 1997 04 17 01 32 1 12.4 -9 690.20 -47.4 -47.5 -47.5 71 -99 SPO 1997 04 17 01 33 1 12.3 -9 690.30 -47.4 -47.6 -47.6 71 -99 SPO 1997 04 17 01 34 2 12.4 -9 690.30 -47.4 -47.6 -47.6 71 -99 SPO 1997 04 17 01 35 1 12.5 -9 690.30 -47.5 -47.6 -47.6 72 -99 SPO 1997 04 17 01 36 2 11.9 -9 690.30 -47.5 -47.6 -47.6 73 -99 SPO 1997 04 17 01 37 3 12.2 -9 690.30 -47.5 -47.6 -47.6 73 -99 SPO 1997 04 17 01 38 1 11.8 -9 690.30 -47.5 -47.5 -47.6 72 -99 SPO 1997 04 17 01 39 2 12.2 -9 690.30 -47.5 -47.5 -47.6 71 -99 SPO 1997 04 17 01 40 3 12.1 -9 690.30 -47.5 -47.5 -47.6 71 -99 SPO 1997 04 17 01 41 2 11.9 -9 690.30 -47.5 -47.5 -47.6 70 -99 SPO 1997 04 17 01 42 2 12.1 -9 690.30 -47.4 -47.5 -47.6 68 -99 SPO 1997 04 17 01 43 1 11.9 -9 690.30 -47.4 -47.5 -47.5 69 -99 SPO 1997 04 17 01 44 1 12.2 -9 690.30 -47.4 -47.4 -47.5 70 -99 SPO 1997 04 17 01 45 1 12.3 -9 690.40 -47.4 -47.3 -47.4 70 -99 SPO 1997 04 17 01 46 2 12.3 -9 690.40 -47.3 -47.2 -47.3 71 -99 SPO 1997 04 17 01 47 1 11.8 -9 690.40 -47.3 -47.2 -47.3 72 -99 SPO 1997 04 17 01 48 360 12.2 -9 690.30 -47.2 -47.1 -47.3 71 -99 SPO 1997 04 17 01 49 359 12.5 -9 690.40 -47.2 -47.1 -47.2 71 -99 SPO 1997 04 17 01 50 357 12.4 -9 690.30 -47.2 -47.1 -47.2 71 -99 SPO 1997 04 17 01 51 356 12.3 -9 690.30 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 52 356 12.3 -9 690.30 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 53 356 12.2 -9 690.40 -47.1 -47.1 -47.2 70 -99 SPO 1997 04 17 01 54 357 12.2 -9 690.40 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 55 357 12.5 -9 690.40 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 56 357 12.2 -9 690.40 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 57 357 12.3 -9 690.40 -47.1 -47.1 -47.2 71 -99 SPO 1997 04 17 01 58 357 12.6 -9 690.40 -47.0 -47.0 -47.2 72 -99 SPO 1997 04 17 01 59 358 12.0 -9 690.40 -47.0 -47.0 -47.1 72 -99 SPO 1997 04 17 02 00 358 12.2 -9 690.40 -47.0 -47.0 -47.1 73 0 SPO 1997 04 17 02 01 357 12.2 -9 690.50 -47.0 -46.9 -47.1 73 -99 SPO 1997 04 17 02 02 359 12.5 -9 690.50 -47.0 -46.8 -47.0 73 -99 SPO 1997 04 17 02 03 358 12.1 -9 690.50 -46.9 -46.8 -47.0 72 -99 SPO 1997 04 17 02 04 359 11.4 -9 690.60 -46.9 -46.8 -47.0 72 -99 SPO 1997 04 17 02 05 359 11.1 -9 690.60 -46.9 -46.8 -47.0 70 -99 SPO 1997 04 17 02 06 1 11.5 -9 690.60 -46.9 -46.9 -47.0 72 -99 SPO 1997 04 17 02 07 2 11.2 -9 690.60 -46.9 -46.9 -47.0 72 -99 SPO 1997 04 17 02 08 2 11.1 -9 690.60 -46.9 -46.9 -47.0 73 -99 SPO 1997 04 17 02 09 3 11.4 -9 690.60 -46.9 -47.0 -47.1 74 -99 SPO 1997 04 17 02 10 2 11.6 -9 690.60 -46.9 -47.0 -47.0 75 -99 SPO 1997 04 17 02 11 2 12.1 -9 690.60 -46.9 -47.0 -47.0 75 -99 SPO 1997 04 17 02 12 2 12.4 -9 690.50 -46.9 -46.9 -46.9 76 -99 SPO 1997 04 17 02 13 1 11.7 -9 690.60 -46.8 -46.9 -46.9 75 -99 SPO 1997 04 17 02 14 1 12.3 -9 690.60 -46.8 -46.8 -46.8 75 -99 SPO 1997 04 17 02 15 1 12.1 -9 690.50 -46.8 -46.8 -46.8 75 -99 SPO 1997 04 17 02 16 360 11.9 -9 690.50 -46.7 -46.7 -46.8 73 -99 SPO 1997 04 17 02 17 1 12.0 -9 690.60 -46.7 -46.7 -46.8 73 -99 SPO 1997 04 17 02 18 1 11.7 -9 690.60 -46.7 -46.7 -46.8 73 -99 SPO 1997 04 17 02 19 1 11.6 -9 690.60 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 17 02 20 3 11.8 -9 690.50 -46.7 -46.7 -46.8 73 -99 SPO 1997 04 17 02 21 1 12.1 -9 690.50 -46.7 -46.7 -46.8 74 -99 SPO 1997 04 17 02 22 2 12.1 -9 690.50 -46.7 -46.7 -46.8 75 -99 SPO 1997 04 17 02 23 1 12.0 -9 690.60 -46.7 -46.6 -46.8 75 -99 SPO 1997 04 17 02 24 2 12.0 -9 690.60 -46.7 -46.6 -46.7 75 -99 SPO 1997 04 17 02 25 4 12.3 -9 690.60 -46.6 -46.6 -46.7 74 -99 SPO 1997 04 17 02 26 4 11.5 -9 690.60 -46.6 -46.6 -46.8 74 -99 SPO 1997 04 17 02 27 4 11.4 -9 690.60 -46.6 -46.6 -46.8 72 -99 SPO 1997 04 17 02 28 3 11.4 -9 690.60 -46.7 -46.7 -46.8 73 -99 SPO 1997 04 17 02 29 4 11.2 -9 690.60 -46.6 -46.7 -46.8 72 -99 SPO 1997 04 17 02 30 3 11.4 -9 690.60 -46.6 -46.6 -46.7 72 -99 SPO 1997 04 17 02 31 3 11.8 -9 690.60 -46.6 -46.6 -46.6 71 -99 SPO 1997 04 17 02 32 3 11.9 -9 690.70 -46.6 -46.6 -46.6 72 -99 SPO 1997 04 17 02 33 3 11.7 -9 690.80 -46.5 -46.5 -46.6 72 -99 SPO 1997 04 17 02 34 5 10.9 -9 690.80 -46.5 -46.6 -46.6 72 -99 SPO 1997 04 17 02 35 6 10.6 -9 690.80 -46.5 -46.6 -46.7 72 -99 SPO 1997 04 17 02 36 5 10.8 -9 690.80 -46.6 -46.7 -46.7 72 -99 SPO 1997 04 17 02 37 4 10.8 -9 690.80 -46.6 -46.7 -46.8 72 -99 SPO 1997 04 17 02 38 4 11.1 -9 690.80 -46.6 -46.7 -46.7 72 -99 SPO 1997 04 17 02 39 2 10.8 -9 690.80 -46.6 -46.7 -46.7 72 -99 SPO 1997 04 17 02 40 0 11.2 -9 690.80 -46.6 -46.6 -46.7 71 -99 SPO 1997 04 17 02 41 360 11.4 -9 690.80 -46.6 -46.6 -46.7 71 -99 SPO 1997 04 17 02 42 359 11.3 -9 690.90 -46.6 -46.5 -46.6 70 -99 SPO 1997 04 17 02 43 359 11.8 -9 690.80 -46.5 -46.5 -46.6 69 -99 SPO 1997 04 17 02 44 360 11.7 -9 690.80 -46.5 -46.4 -46.5 70 -99 SPO 1997 04 17 02 45 360 11.6 -9 690.80 -46.5 -46.4 -46.5 70 -99 SPO 1997 04 17 02 46 1 11.5 -9 690.80 -46.4 -46.4 -46.5 69 -99 SPO 1997 04 17 02 47 2 11.5 -9 690.90 -46.4 -46.4 -46.5 70 -99 SPO 1997 04 17 02 48 1 11.6 -9 690.80 -46.4 -46.5 -46.6 71 -99 SPO 1997 04 17 02 49 2 12.4 -9 690.80 -46.4 -46.5 -46.6 71 -99 SPO 1997 04 17 02 50 1 11.6 -9 690.80 -46.4 -46.5 -46.5 71 -99 SPO 1997 04 17 02 51 2 11.2 -9 690.80 -46.4 -46.5 -46.5 70 -99 SPO 1997 04 17 02 52 360 10.9 -9 690.80 -46.4 -46.4 -46.5 69 -99 SPO 1997 04 17 02 53 2 11.5 -9 690.80 -46.4 -46.4 -46.4 69 -99 SPO 1997 04 17 02 54 3 11.3 -9 690.80 -46.4 -46.4 -46.4 69 -99 SPO 1997 04 17 02 55 5 10.9 -9 690.90 -46.4 -46.4 -46.5 69 -99 SPO 1997 04 17 02 56 6 11.5 -9 690.90 -46.3 -46.4 -46.5 69 -99 SPO 1997 04 17 02 57 6 11.0 -9 690.90 -46.3 -46.4 -46.5 70 -99 SPO 1997 04 17 02 58 6 11.1 -9 690.80 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 17 02 59 8 10.8 -9 690.90 -46.3 -46.4 -46.5 72 -99 SPO 1997 04 17 03 00 8 10.9 -9 690.90 -46.4 -46.4 -46.5 72 0 SPO 1997 04 17 03 01 7 10.8 -9 690.80 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 17 03 02 6 11.5 -9 690.80 -46.4 -46.4 -46.4 72 -99 SPO 1997 04 17 03 03 5 11.8 -9 690.80 -46.3 -46.3 -46.4 72 -99 SPO 1997 04 17 03 04 4 11.4 -9 690.80 -46.3 -46.3 -46.4 72 -99 SPO 1997 04 17 03 05 4 11.8 -9 690.70 -46.3 -46.3 -46.4 70 -99 SPO 1997 04 17 03 06 3 11.6 -9 690.70 -46.3 -46.4 -46.4 70 -99 SPO 1997 04 17 03 07 6 11.5 -9 690.70 -46.3 -46.4 -46.4 70 -99 SPO 1997 04 17 03 08 6 11.6 -9 690.70 -46.3 -46.4 -46.4 71 -99 SPO 1997 04 17 03 09 6 11.6 -9 690.80 -46.3 -46.4 -46.4 72 -99 SPO 1997 04 17 03 10 5 11.4 -9 690.80 -46.3 -46.4 -46.3 72 -99 SPO 1997 04 17 03 11 5 11.4 -9 690.80 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 17 03 12 3 11.7 -9 690.70 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 17 03 13 3 11.9 -9 690.70 -46.2 -46.2 -46.2 71 -99 SPO 1997 04 17 03 14 3 11.9 -9 690.70 -46.2 -46.2 -46.2 71 -99 SPO 1997 04 17 03 15 3 11.6 -9 690.80 -46.2 -46.2 -46.2 72 -99 SPO 1997 04 17 03 16 3 11.2 -9 690.80 -46.1 -46.2 -46.3 70 -99 SPO 1997 04 17 03 17 4 10.8 -9 690.80 -46.2 -46.2 -46.3 71 -99 SPO 1997 04 17 03 18 3 11.5 -9 690.80 -46.2 -46.2 -46.3 71 -99 SPO 1997 04 17 03 19 1 11.1 -9 690.80 -46.2 -46.2 -46.3 70 -99 SPO 1997 04 17 03 20 0 11.6 -9 690.80 -46.2 -46.2 -46.2 70 -99 SPO 1997 04 17 03 21 0 11.5 -9 690.80 -46.1 -46.1 -46.2 70 -99 SPO 1997 04 17 03 22 360 12.2 -9 690.80 -46.1 -46.1 -46.2 72 -99 SPO 1997 04 17 03 23 359 12.4 -9 690.80 -46.1 -46.0 -46.1 72 -99 SPO 1997 04 17 03 24 359 11.8 -9 690.80 -46.1 -46.0 -46.2 72 -99 SPO 1997 04 17 03 25 359 11.9 -9 690.80 -46.1 -46.0 -46.2 72 -99 SPO 1997 04 17 03 26 356 12.0 -9 690.80 -46.1 -46.1 -46.1 72 -99 SPO 1997 04 17 03 27 358 12.7 -9 690.80 -46.0 -46.1 -46.1 72 -99 SPO 1997 04 17 03 28 357 11.7 -9 690.80 -46.0 -46.1 -46.1 73 -99 SPO 1997 04 17 03 29 359 11.5 -9 690.80 -46.0 -46.0 -46.1 72 -99 SPO 1997 04 17 03 30 359 11.6 -9 690.80 -46.0 -46.1 -46.1 71 -99 SPO 1997 04 17 03 31 1 11.6 -9 690.90 -46.0 -46.1 -46.2 70 -99 SPO 1997 04 17 03 32 2 11.8 -9 690.90 -46.0 -46.1 -46.1 70 -99 SPO 1997 04 17 03 33 1 11.4 -9 690.90 -46.1 -46.1 -46.2 72 -99 SPO 1997 04 17 03 34 359 11.8 -9 690.90 -46.0 -46.0 -46.2 71 -99 SPO 1997 04 17 03 35 358 11.9 -9 690.90 -46.0 -46.0 -46.1 72 -99 SPO 1997 04 17 03 36 0 11.9 -9 690.90 -46.0 -46.0 -46.1 73 -99 SPO 1997 04 17 03 37 0 11.8 -9 690.90 -46.0 -46.0 -46.1 73 -99 SPO 1997 04 17 03 38 359 11.4 -9 691.00 -46.0 -46.0 -46.1 73 -99 SPO 1997 04 17 03 39 359 10.5 -9 691.00 -46.0 -46.0 -46.1 73 -99 SPO 1997 04 17 03 40 0 11.2 -9 691.00 -46.0 -46.0 -46.1 73 -99 SPO 1997 04 17 03 41 359 12.0 -9 690.90 -46.0 -45.9 -46.0 71 -99 SPO 1997 04 17 03 42 357 11.7 -9 690.90 -45.9 -45.8 -45.9 70 -99 SPO 1997 04 17 03 43 359 11.5 -9 691.00 -45.9 -45.8 -45.9 69 -99 SPO 1997 04 17 03 44 0 11.4 -9 691.00 -45.9 -45.7 -45.9 69 -99 SPO 1997 04 17 03 45 3 11.2 -9 691.10 -45.8 -45.8 -45.9 69 -99 SPO 1997 04 17 03 46 3 11.0 -9 691.00 -45.8 -45.8 -45.9 70 -99 SPO 1997 04 17 03 47 3 10.9 -9 691.00 -45.8 -45.9 -45.9 71 -99 SPO 1997 04 17 03 48 1 10.9 -9 691.10 -45.8 -45.9 -45.9 72 -99 SPO 1997 04 17 03 49 2 11.5 -9 691.10 -45.8 -45.9 -45.9 72 -99 SPO 1997 04 17 03 50 2 11.1 -9 691.10 -45.8 -45.9 -45.9 72 -99 SPO 1997 04 17 03 51 3 11.8 -9 691.10 -45.8 -45.8 -45.9 72 -99 SPO 1997 04 17 03 52 4 11.6 -9 691.10 -45.8 -45.8 -45.9 73 -99 SPO 1997 04 17 03 53 4 11.1 -9 691.10 -45.8 -45.8 -45.9 72 -99 SPO 1997 04 17 03 54 6 10.9 -9 691.00 -45.8 -45.9 -46.0 71 -99 SPO 1997 04 17 03 55 6 11.3 -9 691.10 -45.8 -45.8 -46.0 70 -99 SPO 1997 04 17 03 56 6 11.2 -9 691.00 -45.8 -45.8 -46.0 69 -99 SPO 1997 04 17 03 57 4 11.9 -9 691.00 -45.8 -45.8 -45.9 70 -99 SPO 1997 04 17 03 58 4 11.1 -9 691.00 -45.8 -45.8 -45.9 71 -99 SPO 1997 04 17 03 59 3 12.2 -9 691.00 -45.8 -45.8 -45.9 72 -99 SPO 1997 04 17 04 00 3 11.8 -9 691.00 -45.8 -45.7 -45.9 73 0 SPO 1997 04 17 04 01 4 11.4 -9 691.00 -45.8 -45.7 -45.9 73 -99 SPO 1997 04 17 04 02 5 11.4 -9 691.00 -45.8 -45.7 -45.9 73 -99 SPO 1997 04 17 04 03 5 10.9 -9 691.00 -45.8 -45.7 -45.9 73 -99 SPO 1997 04 17 04 04 5 11.3 -9 691.00 -45.8 -45.8 -45.9 73 -99 SPO 1997 04 17 04 05 6 11.0 -9 691.00 -45.8 -45.8 -46.0 73 -99 SPO 1997 04 17 04 06 6 11.0 -9 691.00 -45.8 -45.9 -46.0 72 -99 SPO 1997 04 17 04 07 4 11.5 -9 691.00 -45.8 -45.8 -46.0 71 -99 SPO 1997 04 17 04 08 2 11.4 -9 691.00 -45.8 -45.8 -45.9 71 -99 SPO 1997 04 17 04 09 359 12.0 -9 691.00 -45.8 -45.8 -45.8 70 -99 SPO 1997 04 17 04 10 360 11.8 -9 691.10 -45.7 -45.7 -45.8 70 -99 SPO 1997 04 17 04 11 359 10.8 -9 691.10 -45.7 -45.7 -45.8 71 -99 SPO 1997 04 17 04 12 358 11.2 -9 691.10 -45.7 -45.7 -45.8 72 -99 SPO 1997 04 17 04 13 359 11.7 -9 691.00 -45.7 -45.7 -45.8 72 -99 SPO 1997 04 17 04 14 360 11.7 -9 691.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 17 04 15 357 11.6 -9 691.00 -45.6 -45.6 -45.8 73 -99 SPO 1997 04 17 04 16 1 11.1 -9 691.10 -45.6 -45.6 -45.8 73 -99 SPO 1997 04 17 04 17 2 11.6 -9 691.00 -45.7 -45.6 -45.8 74 -99 SPO 1997 04 17 04 18 1 11.8 -9 691.00 -45.6 -45.6 -45.8 73 -99 SPO 1997 04 17 04 19 1 11.6 -9 691.00 -45.7 -45.6 -45.8 73 -99 SPO 1997 04 17 04 20 0 12.5 -9 691.00 -45.7 -45.6 -45.8 73 -99 SPO 1997 04 17 04 21 0 12.1 -9 691.00 -45.6 -45.6 -45.8 72 -99 SPO 1997 04 17 04 22 1 11.9 -9 691.00 -45.7 -45.6 -45.8 73 -99 SPO 1997 04 17 04 23 2 12.1 -9 691.00 -45.6 -45.6 -45.8 72 -99 SPO 1997 04 17 04 24 1 11.9 -9 691.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 17 04 25 0 12.3 -9 691.00 -45.7 -45.7 -45.8 74 -99 SPO 1997 04 17 04 26 360 12.5 -9 691.00 -45.7 -45.7 -45.8 74 -99 SPO 1997 04 17 04 27 359 12.6 -9 691.00 -45.7 -45.7 -45.8 74 -99 SPO 1997 04 17 04 28 359 13.0 -9 691.00 -45.6 -45.6 -45.7 74 -99 SPO 1997 04 17 04 29 359 11.9 -9 691.00 -45.6 -45.6 -45.8 74 -99 SPO 1997 04 17 04 30 0 12.1 -9 691.00 -45.6 -45.7 -45.7 74 -99 SPO 1997 04 17 04 31 1 11.7 -9 691.10 -45.6 -45.6 -45.7 73 -99 SPO 1997 04 17 04 32 359 12.1 -9 691.10 -45.6 -45.6 -45.7 73 -99 SPO 1997 04 17 04 33 359 12.3 -9 691.10 -45.6 -45.6 -45.7 72 -99 SPO 1997 04 17 04 34 360 11.9 -9 691.20 -45.6 -45.6 -45.7 72 -99 SPO 1997 04 17 04 35 358 11.9 -9 691.10 -45.6 -45.5 -45.7 72 -99 SPO 1997 04 17 04 36 358 11.7 -9 691.10 -45.6 -45.5 -45.7 73 -99 SPO 1997 04 17 04 37 358 11.7 -9 691.10 -45.5 -45.5 -45.6 73 -99 SPO 1997 04 17 04 38 360 11.9 -9 691.20 -45.5 -45.5 -45.7 73 -99 SPO 1997 04 17 04 39 358 11.4 -9 691.20 -45.5 -45.5 -45.6 73 -99 SPO 1997 04 17 04 40 2 12.1 -9 691.20 -45.5 -45.4 -45.6 73 -99 SPO 1997 04 17 04 41 359 12.2 -9 691.20 -45.5 -45.4 -45.6 74 -99 SPO 1997 04 17 04 42 358 12.5 -9 691.20 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 17 04 43 358 12.0 -9 691.20 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 17 04 44 359 11.9 -9 691.20 -45.4 -45.5 -45.6 73 -99 SPO 1997 04 17 04 45 358 11.7 -9 691.20 -45.4 -45.5 -45.6 72 -99 SPO 1997 04 17 04 46 357 12.3 -9 691.20 -45.5 -45.5 -45.6 73 -99 SPO 1997 04 17 04 47 357 12.0 -9 691.20 -45.5 -45.6 -45.6 73 -99 SPO 1997 04 17 04 48 357 12.1 -9 691.20 -45.5 -45.6 -45.6 75 -99 SPO 1997 04 17 04 49 355 12.7 -9 691.20 -45.5 -45.6 -45.6 75 -99 SPO 1997 04 17 04 50 356 12.9 -9 691.20 -45.5 -45.5 -45.5 75 -99 SPO 1997 04 17 04 51 354 12.8 -9 691.10 -45.4 -45.5 -45.5 74 -99 SPO 1997 04 17 04 52 354 13.2 -9 691.20 -45.4 -45.4 -45.4 74 -99 SPO 1997 04 17 04 53 354 12.8 -9 691.20 -45.4 -45.4 -45.4 74 -99 SPO 1997 04 17 04 54 355 12.2 -9 691.20 -45.3 -45.4 -45.4 73 -99 SPO 1997 04 17 04 55 355 12.6 -9 691.20 -45.3 -45.3 -45.4 73 -99 SPO 1997 04 17 04 56 355 12.2 -9 691.20 -45.3 -45.3 -45.4 72 -99 SPO 1997 04 17 04 57 356 12.1 -9 691.20 -45.3 -45.2 -45.4 72 -99 SPO 1997 04 17 04 58 357 12.2 -9 691.20 -45.3 -45.3 -45.4 71 -99 SPO 1997 04 17 04 59 356 12.2 -9 691.20 -45.3 -45.3 -45.5 71 -99 SPO 1997 04 17 05 00 357 12.4 -9 691.20 -45.3 -45.3 -45.5 72 0 SPO 1997 04 17 05 01 356 12.2 -9 691.20 -45.3 -45.3 -45.5 72 -99 SPO 1997 04 17 05 02 357 12.0 -9 691.20 -45.3 -45.3 -45.5 72 -99 SPO 1997 04 17 05 03 357 12.1 -9 691.20 -45.3 -45.4 -45.5 72 -99 SPO 1997 04 17 05 04 356 12.1 -9 691.20 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 17 05 05 357 11.9 -9 691.20 -45.4 -45.5 -45.5 74 -99 SPO 1997 04 17 05 06 357 12.5 -9 691.20 -45.4 -45.4 -45.4 74 -99 SPO 1997 04 17 05 07 356 12.9 -9 691.20 -45.3 -45.3 -45.4 73 -99 SPO 1997 04 17 05 08 355 11.9 -9 691.20 -45.3 -45.3 -45.4 72 -99 SPO 1997 04 17 05 09 356 12.3 -9 691.20 -45.3 -45.3 -45.4 72 -99 SPO 1997 04 17 05 10 355 11.7 -9 691.20 -45.3 -45.3 -45.4 71 -99 SPO 1997 04 17 05 11 355 11.3 -9 691.20 -45.3 -45.4 -45.4 71 -99 SPO 1997 04 17 05 12 354 11.9 -9 691.20 -45.3 -45.3 -45.4 72 -99 SPO 1997 04 17 05 13 353 12.2 -9 691.20 -45.3 -45.3 -45.4 73 -99 SPO 1997 04 17 05 14 355 12.8 -9 691.20 -45.3 -45.3 -45.4 73 -99 SPO 1997 04 17 05 15 354 12.8 -9 691.20 -45.3 -45.2 -45.3 73 -99 SPO 1997 04 17 05 16 354 13.1 -9 691.20 -45.2 -45.2 -45.3 73 -99 SPO 1997 04 17 05 17 353 12.7 -9 691.20 -45.2 -45.2 -45.3 74 -99 SPO 1997 04 17 05 18 353 13.2 -9 691.10 -45.2 -45.2 -45.3 74 -99 SPO 1997 04 17 05 19 353 13.3 -9 691.20 -45.2 -45.2 -45.3 74 -99 SPO 1997 04 17 05 20 353 13.1 -9 691.20 -45.2 -45.1 -45.2 74 -99 SPO 1997 04 17 05 21 354 13.2 -9 691.20 -45.1 -45.1 -45.2 72 -99 SPO 1997 04 17 05 22 355 12.9 -9 691.20 -45.1 -45.1 -45.3 72 -99 SPO 1997 04 17 05 23 354 13.2 -9 691.20 -45.1 -45.1 -45.3 70 -99 SPO 1997 04 17 05 24 354 12.9 -9 691.20 -45.1 -45.2 -45.3 72 -99 SPO 1997 04 17 05 25 353 13.3 -9 691.20 -45.1 -45.2 -45.3 72 -99 SPO 1997 04 17 05 26 353 13.2 -9 691.20 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 17 05 27 353 12.8 -9 691.30 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 17 05 28 353 13.2 -9 691.20 -45.1 -45.1 -45.2 73 -99 SPO 1997 04 17 05 29 354 11.8 -9 691.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 30 354 12.0 -9 691.40 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 31 354 12.0 -9 691.40 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 32 355 12.0 -9 691.40 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 33 356 12.4 -9 691.40 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 34 357 11.7 -9 691.40 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 17 05 35 358 12.1 -9 691.40 -45.0 -45.0 -45.1 72 -99 SPO 1997 04 17 05 36 358 11.8 -9 691.40 -45.0 -45.1 -45.2 72 -99 SPO 1997 04 17 05 37 358 12.2 -9 691.30 -45.0 -45.1 -45.2 72 -99 SPO 1997 04 17 05 38 358 12.2 -9 691.30 -45.1 -45.1 -45.3 73 -99 SPO 1997 04 17 05 39 357 12.3 -9 691.30 -45.1 -45.1 -45.3 73 -99 SPO 1997 04 17 05 40 355 11.9 -9 691.30 -45.1 -45.1 -45.2 74 -99 SPO 1997 04 17 05 41 356 12.4 -9 691.30 -45.1 -45.0 -45.2 74 -99 SPO 1997 04 17 05 42 356 12.3 -9 691.40 -45.1 -45.0 -45.2 73 -99 SPO 1997 04 17 05 43 355 12.3 -9 691.40 -45.0 -45.0 -45.1 72 -99 SPO 1997 04 17 05 44 355 11.8 -9 691.40 -45.0 -45.0 -45.0 72 -99 SPO 1997 04 17 05 45 355 11.5 -9 691.50 -45.0 -45.0 -45.0 71 -99 SPO 1997 04 17 05 46 356 11.0 -9 691.60 -44.9 -45.0 -45.0 70 -99 SPO 1997 04 17 05 47 358 11.6 -9 691.50 -44.9 -45.0 -45.0 71 -99 SPO 1997 04 17 05 48 359 11.7 -9 691.50 -44.9 -45.0 -45.0 71 -99 SPO 1997 04 17 05 49 1 11.7 -9 691.60 -44.9 -45.0 -45.0 72 -99 SPO 1997 04 17 05 50 360 11.9 -9 691.50 -44.9 -45.0 -45.1 74 -99 SPO 1997 04 17 05 51 360 12.1 -9 691.50 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 17 05 52 358 12.5 -9 691.50 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 17 05 53 358 12.3 -9 691.50 -44.9 -44.9 -45.0 74 -99 SPO 1997 04 17 05 54 357 12.3 -9 691.50 -44.9 -44.9 -45.0 74 -99 SPO 1997 04 17 05 55 358 12.0 -9 691.50 -44.8 -44.9 -45.0 74 -99 SPO 1997 04 17 05 56 359 11.2 -9 691.50 -44.8 -44.9 -45.0 74 -99 SPO 1997 04 17 05 57 358 12.1 -9 691.50 -44.8 -44.9 -45.0 74 -99 SPO 1997 04 17 05 58 356 11.8 -9 691.50 -44.8 -44.8 -44.9 74 -99 SPO 1997 04 17 05 59 356 12.2 -9 691.50 -44.8 -44.8 -44.9 73 -99 SPO 1997 04 17 06 00 355 12.0 -9 691.50 -44.8 -44.8 -44.9 73 0 SPO 1997 04 17 06 01 355 11.8 -9 691.50 -44.8 -44.7 -44.9 73 -99 SPO 1997 04 17 06 02 354 12.0 -9 691.50 -44.7 -44.7 -44.8 72 -99 SPO 1997 04 17 06 03 356 11.7 -9 691.50 -44.7 -44.7 -44.8 73 -99 SPO 1997 04 17 06 04 356 11.7 -9 691.50 -44.7 -44.7 -44.7 74 -99 SPO 1997 04 17 06 05 356 13.3 -9 691.50 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 17 06 06 357 13.1 -9 691.50 -44.5 -44.5 -44.5 74 -99 SPO 1997 04 17 06 07 356 12.2 -9 691.50 -44.5 -44.5 -44.5 74 -99 SPO 1997 04 17 06 08 356 12.2 -9 691.60 -44.5 -44.5 -44.5 74 -99 SPO 1997 04 17 06 09 358 12.8 -9 691.60 -44.4 -44.4 -44.5 73 -99 SPO 1997 04 17 06 10 360 12.0 -9 691.60 -44.4 -44.5 -44.6 72 -99 SPO 1997 04 17 06 11 357 12.0 -9 691.50 -44.4 -44.6 -44.7 72 -99 SPO 1997 04 17 06 12 354 13.0 -9 691.50 -44.5 -44.6 -44.7 72 -99 SPO 1997 04 17 06 13 354 12.3 -9 691.50 -44.5 -44.6 -44.7 72 -99 SPO 1997 04 17 06 14 353 12.8 -9 691.50 -44.5 -44.5 -44.7 71 -99 SPO 1997 04 17 06 15 353 12.7 -9 691.50 -44.5 -44.5 -44.6 72 -99 SPO 1997 04 17 06 16 355 12.7 -9 691.50 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 17 06 17 356 12.8 -9 691.50 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 17 06 18 360 11.4 -9 691.50 -44.5 -44.6 -44.7 74 -99 SPO 1997 04 17 06 19 3 12.1 -9 691.60 -44.5 -44.6 -44.7 74 -99 SPO 1997 04 17 06 20 1 11.4 -9 691.60 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 17 06 21 359 11.7 -9 691.60 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 17 06 22 357 12.0 -9 691.60 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 17 06 23 357 12.8 -9 691.70 -44.6 -44.6 -44.7 73 -99 SPO 1997 04 17 06 24 356 12.4 -9 691.60 -44.6 -44.6 -44.7 73 -99 SPO 1997 04 17 06 25 355 12.5 -9 691.60 -44.6 -44.7 -44.7 72 -99 SPO 1997 04 17 06 26 353 12.8 -9 691.60 -44.5 -44.7 -44.6 71 -99 SPO 1997 04 17 06 27 356 12.6 -9 691.60 -44.5 -44.7 -44.7 72 -99 SPO 1997 04 17 06 28 355 13.0 -9 691.50 -44.5 -44.7 -44.7 72 -99 SPO 1997 04 17 06 29 355 12.6 -9 691.60 -44.5 -44.7 -44.7 73 -99 SPO 1997 04 17 06 30 354 12.9 -9 691.60 -44.5 -44.6 -44.7 73 -99 SPO 1997 04 17 06 31 355 12.8 -9 691.60 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 17 06 32 355 11.9 -9 691.60 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 17 06 33 356 12.5 -9 691.60 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 17 06 34 358 12.4 -9 691.60 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 17 06 35 359 11.7 -9 691.60 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 17 06 36 0 11.5 -9 691.60 -44.5 -44.6 -44.7 74 -99 SPO 1997 04 17 06 37 359 12.7 -9 691.70 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 17 06 38 357 12.0 -9 691.60 -44.5 -44.6 -44.6 73 -99 SPO 1997 04 17 06 39 357 13.0 -9 691.60 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 17 06 40 357 12.5 -9 691.50 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 17 06 41 359 12.3 -9 691.50 -44.5 -44.4 -44.6 74 -99 SPO 1997 04 17 06 42 356 12.4 -9 691.50 -44.4 -44.4 -44.5 74 -99 SPO 1997 04 17 06 43 357 12.6 -9 691.60 -44.4 -44.4 -44.5 74 -99 SPO 1997 04 17 06 44 355 12.9 -9 691.60 -44.4 -44.4 -44.5 75 -99 SPO 1997 04 17 06 45 355 12.8 -9 691.60 -44.3 -44.4 -44.4 75 -99 SPO 1997 04 17 06 46 356 12.4 -9 691.50 -44.3 -44.5 -44.5 75 -99 SPO 1997 04 17 06 47 355 12.8 -9 691.50 -44.4 -44.5 -44.5 76 -99 SPO 1997 04 17 06 48 354 12.4 -9 691.50 -44.4 -44.5 -44.5 75 -99 SPO 1997 04 17 06 49 355 12.5 -9 691.50 -44.4 -44.5 -44.5 74 -99 SPO 1997 04 17 06 50 355 12.5 -9 691.50 -44.4 -44.6 -44.5 73 -99 SPO 1997 04 17 06 51 356 12.6 -9 691.50 -44.4 -44.5 -44.5 73 -99 SPO 1997 04 17 06 52 356 12.7 -9 691.50 -44.4 -44.5 -44.5 73 -99 SPO 1997 04 17 06 53 357 12.8 -9 691.50 -44.4 -44.4 -44.5 74 -99 SPO 1997 04 17 06 54 357 13.2 -9 691.50 -44.3 -44.4 -44.5 73 -99 SPO 1997 04 17 06 55 358 12.9 -9 691.50 -44.3 -44.4 -44.4 74 -99 SPO 1997 04 17 06 56 356 13.2 -9 691.50 -44.3 -44.3 -44.4 75 -99 SPO 1997 04 17 06 57 354 13.4 -9 691.50 -44.2 -44.2 -44.2 75 -99 SPO 1997 04 17 06 58 354 13.6 -9 691.60 -44.2 -44.1 -44.2 75 -99 SPO 1997 04 17 06 59 354 13.1 -9 691.60 -44.1 -44.1 -44.2 75 -99 SPO 1997 04 17 07 00 354 12.8 -9 691.50 -44.1 -44.1 -44.2 75 0 SPO 1997 04 17 07 01 354 12.6 -9 691.50 -44.2 -44.2 -44.4 75 -99 SPO 1997 04 17 07 02 354 13.6 -9 691.40 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 17 07 03 353 14.6 -9 691.40 -44.2 -44.2 -44.3 72 -99 SPO 1997 04 17 07 04 354 13.8 -9 691.40 -44.2 -44.2 -44.2 72 -99 SPO 1997 04 17 07 05 353 13.6 -9 691.50 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 07 06 353 13.2 -9 691.50 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 07 07 355 14.3 -9 691.50 -44.1 -44.2 -44.2 73 -99 SPO 1997 04 17 07 08 357 14.3 -9 691.50 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 17 07 09 354 13.3 -9 691.50 -44.0 -44.0 -44.1 73 -99 SPO 1997 04 17 07 10 353 13.0 -9 691.60 -44.0 -44.1 -44.0 73 -99 SPO 1997 04 17 07 11 354 12.9 -9 691.60 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 17 07 12 355 13.3 -9 691.50 -44.0 -44.1 -44.2 73 -99 SPO 1997 04 17 07 13 354 13.6 -9 691.50 -44.0 -44.2 -44.2 73 -99 SPO 1997 04 17 07 14 353 13.5 -9 691.50 -44.1 -44.2 -44.3 73 -99 SPO 1997 04 17 07 15 351 13.7 -9 691.50 -44.1 -44.3 -44.3 72 -99 SPO 1997 04 17 07 16 352 13.3 -9 691.50 -44.1 -44.3 -44.3 72 -99 SPO 1997 04 17 07 17 353 13.0 -9 691.50 -44.2 -44.3 -44.3 73 -99 SPO 1997 04 17 07 18 353 13.5 -9 691.50 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 17 07 19 354 13.2 -9 691.50 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 17 07 20 355 13.4 -9 691.50 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 17 07 21 353 13.4 -9 691.60 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 17 07 22 355 13.1 -9 691.60 -44.1 -44.1 -44.2 73 -99 SPO 1997 04 17 07 23 353 13.1 -9 691.60 -44.1 -44.1 -44.2 72 -99 SPO 1997 04 17 07 24 355 12.6 -9 691.60 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 07 25 354 13.7 -9 691.60 -44.0 -44.1 -44.1 72 -99 SPO 1997 04 17 07 26 352 13.2 -9 691.60 -44.0 -44.1 -44.1 71 -99 SPO 1997 04 17 07 27 354 12.7 -9 691.70 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 07 28 358 12.6 -9 691.70 -44.0 -44.1 -44.2 71 -99 SPO 1997 04 17 07 29 357 13.2 -9 691.80 -44.0 -44.1 -44.2 71 -99 SPO 1997 04 17 07 30 358 13.3 -9 691.80 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 07 31 357 13.2 -9 691.80 -44.1 -44.1 -44.2 73 -99 SPO 1997 04 17 07 32 357 13.4 -9 691.80 -44.0 -44.1 -44.2 72 -99 SPO 1997 04 17 07 33 355 13.0 -9 691.80 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 07 34 357 13.3 -9 691.80 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 07 35 357 12.5 -9 691.80 -43.9 -43.9 -44.0 72 -99 SPO 1997 04 17 07 36 357 12.3 -9 691.80 -43.9 -43.9 -44.0 72 -99 SPO 1997 04 17 07 37 1 13.1 -9 691.80 -43.9 -43.9 -44.0 72 -99 SPO 1997 04 17 07 38 359 12.8 -9 691.80 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 07 39 359 12.7 -9 691.90 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 07 40 4 12.7 -9 691.80 -43.8 -43.8 -43.9 70 -99 SPO 1997 04 17 07 41 2 13.3 -9 691.90 -43.8 -43.8 -44.0 70 -99 SPO 1997 04 17 07 42 2 12.3 -9 691.90 -43.9 -43.9 -44.0 70 -99 SPO 1997 04 17 07 43 0 13.1 -9 691.90 -43.9 -43.9 -44.1 70 -99 SPO 1997 04 17 07 44 2 12.8 -9 691.90 -43.9 -44.0 -44.1 70 -99 SPO 1997 04 17 07 45 2 13.1 -9 691.90 -43.9 -44.0 -44.1 71 -99 SPO 1997 04 17 07 46 359 12.4 -9 692.00 -44.0 -44.1 -44.1 72 -99 SPO 1997 04 17 07 47 360 12.1 -9 692.00 -44.0 -44.1 -44.1 73 -99 SPO 1997 04 17 07 48 359 12.3 -9 691.90 -44.0 -44.1 -44.1 73 -99 SPO 1997 04 17 07 49 358 12.9 -9 692.00 -44.0 -44.0 -44.1 73 -99 SPO 1997 04 17 07 50 357 12.5 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 07 51 358 12.9 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 07 52 358 12.0 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 07 53 359 12.4 -9 692.00 -43.9 -44.0 -44.0 72 -99 SPO 1997 04 17 07 54 1 12.2 -9 692.00 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 07 55 1 12.1 -9 692.00 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 07 56 1 12.2 -9 692.00 -43.9 -43.9 -44.0 71 -99 SPO 1997 04 17 07 57 360 13.1 -9 692.00 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 17 07 58 359 12.5 -9 692.00 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 17 07 59 359 12.9 -9 692.00 -43.8 -43.7 -43.8 72 -99 SPO 1997 04 17 08 00 358 12.0 -9 692.00 -43.7 -43.8 -43.9 72 0 SPO 1997 04 17 08 01 359 12.4 -9 692.00 -43.8 -43.8 -43.9 73 -99 SPO 1997 04 17 08 02 359 11.9 -9 692.00 -43.8 -43.8 -44.0 74 -99 SPO 1997 04 17 08 03 3 12.1 -9 692.00 -43.8 -43.8 -44.0 74 -99 SPO 1997 04 17 08 04 5 12.2 -9 692.00 -43.8 -43.8 -44.0 72 -99 SPO 1997 04 17 08 05 2 11.5 -9 692.00 -43.8 -44.0 -44.0 71 -99 SPO 1997 04 17 08 06 4 12.4 -9 692.00 -43.8 -44.0 -44.1 71 -99 SPO 1997 04 17 08 07 5 13.1 -9 692.00 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 08 08 5 12.4 -9 692.00 -43.9 -44.0 -44.1 71 -99 SPO 1997 04 17 08 09 5 13.1 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 08 10 4 12.2 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 08 11 3 12.1 -9 692.00 -43.9 -44.0 -44.1 74 -99 SPO 1997 04 17 08 12 2 12.6 -9 692.00 -44.0 -44.1 -44.1 75 -99 SPO 1997 04 17 08 13 5 11.9 -9 692.00 -44.0 -44.1 -44.1 75 -99 SPO 1997 04 17 08 14 4 12.6 -9 692.00 -43.9 -44.0 -44.2 75 -99 SPO 1997 04 17 08 15 5 13.3 -9 691.90 -44.0 -43.9 -44.1 76 -99 SPO 1997 04 17 08 16 3 12.6 -9 692.00 -43.9 -44.0 -44.1 75 -99 SPO 1997 04 17 08 17 3 12.8 -9 692.00 -44.0 -44.0 -44.1 75 -99 SPO 1997 04 17 08 18 360 12.1 -9 692.00 -44.0 -43.9 -44.1 75 -99 SPO 1997 04 17 08 19 1 12.4 -9 692.00 -43.9 -44.0 -44.1 73 -99 SPO 1997 04 17 08 20 360 12.3 -9 692.00 -43.9 -44.0 -44.1 73 -99 SPO 1997 04 17 08 21 360 12.3 -9 692.00 -43.9 -43.9 -44.0 73 -99 SPO 1997 04 17 08 22 0 12.1 -9 692.00 -43.9 -43.9 -44.0 74 -99 SPO 1997 04 17 08 23 2 12.5 -9 692.00 -43.9 -43.9 -44.0 75 -99 SPO 1997 04 17 08 24 3 12.4 -9 692.00 -43.9 -43.9 -44.0 74 -99 SPO 1997 04 17 08 25 6 12.3 -9 692.00 -43.9 -44.0 -44.1 74 -99 SPO 1997 04 17 08 26 5 12.3 -9 692.00 -44.0 -44.0 -44.2 75 -99 SPO 1997 04 17 08 27 6 12.0 -9 692.00 -43.9 -44.1 -44.1 74 -99 SPO 1997 04 17 08 28 6 11.9 -9 692.00 -44.0 -44.1 -44.2 75 -99 SPO 1997 04 17 08 29 6 12.5 -9 692.00 -44.0 -44.1 -44.2 75 -99 SPO 1997 04 17 08 30 6 13.1 -9 692.00 -44.0 -44.1 -44.2 74 -99 SPO 1997 04 17 08 31 6 12.5 -9 692.10 -44.1 -44.2 -44.2 73 -99 SPO 1997 04 17 08 32 4 11.6 -9 692.10 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 17 08 33 5 12.4 -9 692.10 -44.2 -44.2 -44.3 73 -99 SPO 1997 04 17 08 34 2 12.7 -9 692.10 -44.1 -44.2 -44.3 72 -99 SPO 1997 04 17 08 35 2 12.9 -9 692.00 -44.1 -44.2 -44.2 72 -99 SPO 1997 04 17 08 36 1 13.2 -9 692.00 -44.0 -44.0 -44.1 72 -99 SPO 1997 04 17 08 37 0 12.8 -9 692.00 -44.0 -43.9 -44.0 73 -99 SPO 1997 04 17 08 38 4 12.6 -9 692.10 -43.8 -43.8 -43.8 72 -99 SPO 1997 04 17 08 39 5 11.8 -9 692.20 -43.8 -43.8 -43.9 73 -99 SPO 1997 04 17 08 40 4 11.6 -9 692.20 -43.8 -43.8 -43.9 73 -99 SPO 1997 04 17 08 41 7 11.9 -9 692.20 -43.8 -43.7 -43.8 74 -99 SPO 1997 04 17 08 42 9 11.9 -9 692.20 -43.8 -43.7 -43.8 74 -99 SPO 1997 04 17 08 43 7 12.1 -9 692.20 -43.7 -43.7 -43.8 73 -99 SPO 1997 04 17 08 44 8 12.2 -9 692.10 -43.7 -43.7 -43.8 71 -99 SPO 1997 04 17 08 45 9 12.3 -9 692.10 -43.7 -43.7 -43.9 71 -99 SPO 1997 04 17 08 46 7 12.4 -9 692.10 -43.7 -43.8 -43.9 71 -99 SPO 1997 04 17 08 47 7 12.2 -9 692.00 -43.8 -44.0 -44.0 71 -99 SPO 1997 04 17 08 48 7 12.3 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 08 49 6 12.1 -9 692.00 -43.9 -44.0 -44.1 73 -99 SPO 1997 04 17 08 50 6 12.4 -9 692.00 -43.9 -44.0 -44.1 74 -99 SPO 1997 04 17 08 51 4 13.2 -9 692.00 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 08 52 4 14.0 -9 691.90 -43.8 -43.8 -43.8 73 -99 SPO 1997 04 17 08 53 3 13.5 -9 691.90 -43.8 -43.7 -43.8 74 -99 SPO 1997 04 17 08 54 2 12.9 -9 691.90 -43.7 -43.7 -43.7 73 -99 SPO 1997 04 17 08 55 5 12.7 -9 692.00 -43.7 -43.7 -43.8 74 -99 SPO 1997 04 17 08 56 7 12.6 -9 692.00 -43.7 -43.8 -43.8 75 -99 SPO 1997 04 17 08 57 9 11.8 -9 692.00 -43.7 -43.9 -44.0 75 -99 SPO 1997 04 17 08 58 9 12.1 -9 692.00 -43.8 -44.0 -44.1 75 -99 SPO 1997 04 17 08 59 8 12.0 -9 692.10 -43.9 -44.0 -44.1 75 -99 SPO 1997 04 17 09 00 7 11.7 -9 692.10 -43.9 -43.9 -44.1 75 0 SPO 1997 04 17 09 01 7 11.9 -9 692.10 -43.9 -43.9 -44.0 75 -99 SPO 1997 04 17 09 02 8 12.3 -9 692.10 -43.8 -43.8 -43.9 74 -99 SPO 1997 04 17 09 03 6 12.8 -9 692.10 -43.8 -43.7 -43.8 75 -99 SPO 1997 04 17 09 04 8 12.0 -9 692.20 -43.7 -43.7 -43.8 74 -99 SPO 1997 04 17 09 05 5 12.5 -9 692.20 -43.7 -43.7 -43.8 74 -99 SPO 1997 04 17 09 06 8 12.2 -9 692.20 -43.7 -43.7 -43.8 73 -99 SPO 1997 04 17 09 07 6 11.7 -9 692.20 -43.7 -43.8 -43.8 74 -99 SPO 1997 04 17 09 08 7 11.7 -9 692.20 -43.7 -43.8 -43.8 73 -99 SPO 1997 04 17 09 09 6 12.6 -9 692.20 -43.7 -43.8 -43.8 72 -99 SPO 1997 04 17 09 10 5 12.9 -9 692.10 -43.7 -43.8 -43.8 71 -99 SPO 1997 04 17 09 11 5 13.1 -9 692.20 -43.7 -43.8 -43.7 71 -99 SPO 1997 04 17 09 12 3 12.3 -9 692.20 -43.6 -43.7 -43.7 71 -99 SPO 1997 04 17 09 13 4 12.2 -9 692.10 -43.6 -43.7 -43.7 72 -99 SPO 1997 04 17 09 14 6 12.4 -9 692.10 -43.6 -43.7 -43.7 73 -99 SPO 1997 04 17 09 15 5 12.3 -9 692.20 -43.7 -43.7 -43.8 74 -99 SPO 1997 04 17 09 16 7 12.7 -9 692.20 -43.7 -43.7 -43.7 75 -99 SPO 1997 04 17 09 17 7 11.9 -9 692.20 -43.6 -43.7 -43.8 74 -99 SPO 1997 04 17 09 18 4 11.7 -9 692.20 -43.6 -43.7 -43.8 73 -99 SPO 1997 04 17 09 19 6 11.5 -9 692.20 -43.6 -43.8 -43.8 72 -99 SPO 1997 04 17 09 20 6 11.5 -9 692.30 -43.7 -43.8 -43.8 73 -99 SPO 1997 04 17 09 21 9 11.9 -9 692.20 -43.7 -43.8 -43.8 72 -99 SPO 1997 04 17 09 22 8 11.1 -9 692.30 -43.7 -43.8 -43.8 71 -99 SPO 1997 04 17 09 23 8 11.2 -9 692.30 -43.7 -43.8 -43.9 71 -99 SPO 1997 04 17 09 24 9 11.8 -9 692.30 -43.7 -43.8 -43.8 71 -99 SPO 1997 04 17 09 25 8 11.7 -9 692.20 -43.7 -43.7 -43.8 71 -99 SPO 1997 04 17 09 26 6 11.5 -9 692.20 -43.7 -43.7 -43.8 71 -99 SPO 1997 04 17 09 27 5 12.1 -9 692.20 -43.6 -43.8 -43.8 70 -99 SPO 1997 04 17 09 28 8 11.7 -9 692.20 -43.6 -43.8 -43.8 71 -99 SPO 1997 04 17 09 29 7 11.7 -9 692.20 -43.7 -43.9 -43.9 71 -99 SPO 1997 04 17 09 30 8 12.0 -9 692.20 -43.8 -44.0 -44.0 72 -99 SPO 1997 04 17 09 31 8 11.6 -9 692.20 -43.8 -44.0 -44.0 72 -99 SPO 1997 04 17 09 32 9 11.4 -9 692.20 -43.8 -44.1 -44.0 71 -99 SPO 1997 04 17 09 33 8 12.0 -9 692.20 -43.8 -44.1 -44.0 71 -99 SPO 1997 04 17 09 34 6 11.7 -9 692.20 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 09 35 7 11.9 -9 692.20 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 09 36 5 12.2 -9 692.30 -43.9 -44.0 -43.9 71 -99 SPO 1997 04 17 09 37 7 12.0 -9 692.20 -43.8 -43.9 -43.9 71 -99 SPO 1997 04 17 09 38 6 12.0 -9 692.20 -43.8 -43.9 -43.9 71 -99 SPO 1997 04 17 09 39 4 12.5 -9 692.20 -43.8 -43.9 -43.9 72 -99 SPO 1997 04 17 09 40 6 11.9 -9 692.20 -43.8 -43.9 -43.9 72 -99 SPO 1997 04 17 09 41 4 11.5 -9 692.20 -43.8 -43.8 -43.9 72 -99 SPO 1997 04 17 09 42 7 11.8 -9 692.20 -43.8 -43.9 -44.0 73 -99 SPO 1997 04 17 09 43 8 11.8 -9 692.20 -43.8 -44.0 -44.0 73 -99 SPO 1997 04 17 09 44 8 11.7 -9 692.20 -43.9 -44.0 -44.1 73 -99 SPO 1997 04 17 09 45 8 11.4 -9 692.20 -43.9 -44.0 -44.1 72 -99 SPO 1997 04 17 09 46 8 11.7 -9 692.20 -43.9 -44.0 -44.1 71 -99 SPO 1997 04 17 09 47 8 11.6 -9 692.20 -43.9 -44.0 -44.0 70 -99 SPO 1997 04 17 09 48 7 11.7 -9 692.20 -43.9 -44.0 -44.0 70 -99 SPO 1997 04 17 09 49 7 12.3 -9 692.20 -43.9 -44.0 -44.0 70 -99 SPO 1997 04 17 09 50 6 12.0 -9 692.20 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 09 51 9 12.1 -9 692.20 -43.9 -44.0 -44.0 72 -99 SPO 1997 04 17 09 52 5 12.1 -9 692.10 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 09 53 8 12.4 -9 692.10 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 17 09 54 5 12.3 -9 692.20 -43.9 -43.9 -43.9 73 -99 SPO 1997 04 17 09 55 7 12.1 -9 692.20 -43.8 -43.9 -43.8 73 -99 SPO 1997 04 17 09 56 5 11.7 -9 692.20 -43.8 -43.8 -43.8 73 -99 SPO 1997 04 17 09 57 7 11.3 -9 692.30 -43.7 -43.8 -43.8 72 -99 SPO 1997 04 17 09 58 9 11.7 -9 692.20 -43.7 -43.8 -43.9 72 -99 SPO 1997 04 17 09 59 6 11.2 -9 692.30 -43.7 -43.8 -43.9 71 -99 SPO 1997 04 17 10 00 8 11.8 -9 692.30 -43.7 -43.9 -43.9 71 0 SPO 1997 04 17 10 01 7 11.9 -9 692.30 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 10 02 7 12.2 -9 692.30 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 10 03 7 12.0 -9 692.30 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 10 04 6 11.3 -9 692.30 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 10 05 6 12.0 -9 692.40 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 17 10 06 9 11.9 -9 692.30 -43.8 -43.8 -43.8 72 -99 SPO 1997 04 17 10 07 10 11.3 -9 692.40 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 17 10 08 9 11.3 -9 692.40 -43.8 -43.9 -43.9 72 -99 SPO 1997 04 17 10 09 8 11.1 -9 692.50 -43.7 -43.9 -44.0 71 -99 SPO 1997 04 17 10 10 9 11.7 -9 692.50 -43.8 -44.0 -44.0 72 -99 SPO 1997 04 17 10 11 10 11.7 -9 692.50 -43.8 -44.0 -44.0 71 -99 SPO 1997 04 17 10 12 9 11.2 -9 692.60 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 10 13 10 10.9 -9 692.60 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 10 14 12 11.4 -9 692.50 -43.9 -44.0 -44.0 70 -99 SPO 1997 04 17 10 15 7 10.9 -9 692.60 -43.9 -44.0 -44.0 70 -99 SPO 1997 04 17 10 16 11 11.1 -9 692.60 -43.9 -44.0 -44.0 71 -99 SPO 1997 04 17 10 17 11 11.5 -9 692.60 -43.8 -44.0 -43.9 71 -99 SPO 1997 04 17 10 18 11 11.2 -9 692.60 -43.8 -43.9 -43.9 71 -99 SPO 1997 04 17 10 19 14 11.4 -9 692.60 -43.8 -43.9 -44.0 72 -99 SPO 1997 04 17 10 20 15 10.7 -9 692.60 -43.8 -44.0 -44.0 72 -99 SPO 1997 04 17 10 21 12 10.4 -9 692.70 -43.8 -44.0 -44.0 72 -99 SPO 1997 04 17 10 22 14 11.1 -9 692.70 -43.9 -44.0 -44.0 72 -99 SPO 1997 04 17 10 23 10 11.0 -9 692.70 -43.8 -43.9 -44.0 71 -99 SPO 1997 04 17 10 24 8 10.8 -9 692.70 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 17 10 25 7 10.8 -9 692.80 -43.8 -43.8 -43.8 71 -99 SPO 1997 04 17 10 26 7 10.3 -9 692.80 -43.8 -43.7 -43.8 70 -99 SPO 1997 04 17 10 27 8 10.3 -9 692.80 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 17 10 28 4 11.0 -9 692.80 -43.6 -43.6 -43.6 68 -99 SPO 1997 04 17 10 29 7 10.2 -9 692.80 -43.6 -43.6 -43.6 69 -99 SPO 1997 04 17 10 30 7 10.5 -9 692.80 -43.6 -43.7 -43.6 71 -99 SPO 1997 04 17 10 31 9 10.7 -9 692.80 -43.6 -43.7 -43.6 72 -99 SPO 1997 04 17 10 32 10 10.8 -9 692.80 -43.6 -43.8 -43.7 72 -99 SPO 1997 04 17 10 33 10 10.7 -9 692.90 -43.6 -43.8 -43.8 72 -99 SPO 1997 04 17 10 34 14 10.4 -9 692.90 -43.6 -43.8 -43.8 72 -99 SPO 1997 04 17 10 35 9 10.8 -9 692.90 -43.7 -43.8 -43.8 73 -99 SPO 1997 04 17 10 36 10 10.6 -9 692.90 -43.7 -43.9 -43.9 73 -99 SPO 1997 04 17 10 37 11 10.8 -9 692.90 -43.8 -43.9 -43.9 73 -99 SPO 1997 04 17 10 38 11 10.2 -9 692.90 -43.8 -43.8 -43.8 72 -99 SPO 1997 04 17 10 39 10 10.6 -9 692.90 -43.6 -43.8 -43.8 71 -99 SPO 1997 04 17 10 40 10 10.3 -9 692.90 -43.6 -43.7 -43.8 70 -99 SPO 1997 04 17 10 41 8 10.9 -9 692.90 -43.6 -43.7 -43.7 71 -99 SPO 1997 04 17 10 42 7 10.9 -9 692.90 -43.6 -43.7 -43.7 71 -99 SPO 1997 04 17 10 43 6 10.4 -9 692.90 -43.6 -43.6 -43.7 72 -99 SPO 1997 04 17 10 44 9 11.1 -9 693.00 -43.6 -43.6 -43.6 71 -99 SPO 1997 04 17 10 45 6 10.6 -9 693.00 -43.6 -43.6 -43.6 71 -99 SPO 1997 04 17 10 46 6 11.6 -9 693.00 -43.5 -43.5 -43.6 70 -99 SPO 1997 04 17 10 47 6 10.7 -9 693.00 -43.5 -43.5 -43.6 70 -99 SPO 1997 04 17 10 48 7 10.5 -9 693.00 -43.5 -43.6 -43.6 69 -99 SPO 1997 04 17 10 49 8 10.6 -9 693.00 -43.5 -43.6 -43.6 70 -99 SPO 1997 04 17 10 50 8 10.7 -9 693.00 -43.5 -43.6 -43.6 70 -99 SPO 1997 04 17 10 51 1 10.8 -9 693.00 -43.5 -43.6 -43.6 69 -99 SPO 1997 04 17 10 52 9 10.1 -9 693.00 -43.5 -43.6 -43.5 68 -99 SPO 1997 04 17 10 53 4 10.6 -9 693.00 -43.5 -43.6 -43.5 69 -99 SPO 1997 04 17 10 54 8 10.4 -9 693.00 -43.5 -43.6 -43.6 70 -99 SPO 1997 04 17 10 55 2 11.1 -9 693.00 -43.4 -43.5 -43.5 70 -99 SPO 1997 04 17 10 56 5 11.2 -9 693.10 -43.4 -43.5 -43.5 70 -99 SPO 1997 04 17 10 57 3 11.4 -9 693.00 -43.4 -43.5 -43.4 70 -99 SPO 1997 04 17 10 58 5 11.2 -9 693.00 -43.4 -43.4 -43.4 71 -99 SPO 1997 04 17 10 59 9 10.9 -9 693.00 -43.4 -43.4 -43.4 71 -99 SPO 1997 04 17 11 00 5 10.4 -9 693.10 -43.4 -43.4 -43.4 71 0 SPO 1997 04 17 11 01 9 9.9 -9 693.20 -43.3 -43.4 -43.5 72 -99 SPO 1997 04 17 11 02 13 11.1 -9 693.10 -43.3 -43.5 -43.5 72 -99 SPO 1997 04 17 11 03 9 10.7 -9 693.20 -43.4 -43.5 -43.5 72 -99 SPO 1997 04 17 11 04 10 10.6 -9 693.20 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 17 11 05 9 11.3 -9 693.10 -43.4 -43.4 -43.5 71 -99 SPO 1997 04 17 11 06 7 11.2 -9 693.10 -43.4 -43.4 -43.5 71 -99 SPO 1997 04 17 11 07 8 11.2 -9 693.10 -43.4 -43.4 -43.5 71 -99 SPO 1997 04 17 11 08 4 11.5 -9 693.00 -43.3 -43.4 -43.4 70 -99 SPO 1997 04 17 11 09 4 11.3 -9 693.00 -43.3 -43.3 -43.4 70 -99 SPO 1997 04 17 11 10 5 11.8 -9 693.00 -43.3 -43.4 -43.4 70 -99 SPO 1997 04 17 11 11 4 11.5 -9 693.00 -43.4 -43.4 -43.4 71 -99 SPO 1997 04 17 11 12 5 11.2 -9 693.00 -43.3 -43.5 -43.4 72 -99 SPO 1997 04 17 11 13 4 11.5 -9 693.00 -43.3 -43.5 -43.4 72 -99 SPO 1997 04 17 11 14 6 11.2 -9 693.10 -43.3 -43.5 -43.5 72 -99 SPO 1997 04 17 11 15 7 11.0 -9 693.10 -43.4 -43.5 -43.5 73 -99 SPO 1997 04 17 11 16 6 10.4 -9 693.10 -43.4 -43.5 -43.5 72 -99 SPO 1997 04 17 11 17 7 10.8 -9 693.20 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 17 11 18 5 10.1 -9 693.20 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 17 11 19 6 11.0 -9 693.20 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 17 11 20 4 11.4 -9 693.20 -43.4 -43.4 -43.4 72 -99 SPO 1997 04 17 11 21 4 11.3 -9 693.20 -43.4 -43.3 -43.3 72 -99 SPO 1997 04 17 11 22 2 11.0 -9 693.20 -43.2 -43.3 -43.4 71 -99 SPO 1997 04 17 11 23 4 11.3 -9 693.20 -43.2 -43.3 -43.3 71 -99 SPO 1997 04 17 11 24 3 11.2 -9 693.20 -43.2 -43.3 -43.3 72 -99 SPO 1997 04 17 11 25 3 11.4 -9 693.20 -43.2 -43.2 -43.3 72 -99 SPO 1997 04 17 11 26 4 11.1 -9 693.20 -43.2 -43.2 -43.3 72 -99 SPO 1997 04 17 11 27 5 11.2 -9 693.20 -43.2 -43.2 -43.2 72 -99 SPO 1997 04 17 11 28 5 11.1 -9 693.30 -43.1 -43.2 -43.3 72 -99 SPO 1997 04 17 11 29 2 10.7 -9 693.20 -43.1 -43.2 -43.3 70 -99 SPO 1997 04 17 11 30 2 11.2 -9 693.20 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 31 1 11.7 -9 693.20 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 32 2 11.2 -9 693.20 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 33 1 11.1 -9 693.20 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 11 34 4 10.6 -9 693.20 -43.1 -43.3 -43.3 72 -99 SPO 1997 04 17 11 35 0 11.2 -9 693.20 -43.1 -43.3 -43.3 72 -99 SPO 1997 04 17 11 36 0 11.0 -9 693.30 -43.1 -43.3 -43.2 72 -99 SPO 1997 04 17 11 37 360 11.2 -9 693.30 -43.1 -43.3 -43.3 73 -99 SPO 1997 04 17 11 38 2 10.7 -9 693.20 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 17 11 39 358 10.5 -9 693.20 -43.2 -43.3 -43.3 74 -99 SPO 1997 04 17 11 40 358 10.7 -9 693.30 -43.2 -43.2 -43.2 73 -99 SPO 1997 04 17 11 41 359 11.4 -9 693.20 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 11 42 0 11.4 -9 693.30 -43.2 -43.2 -43.2 72 -99 SPO 1997 04 17 11 43 1 11.1 -9 693.30 -43.2 -43.2 -43.2 72 -99 SPO 1997 04 17 11 44 0 10.8 -9 693.30 -43.0 -43.2 -43.2 70 -99 SPO 1997 04 17 11 45 1 11.0 -9 693.30 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 46 360 11.4 -9 693.30 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 11 47 1 11.5 -9 693.20 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 11 48 0 11.4 -9 693.20 -43.1 -43.1 -43.2 72 -99 SPO 1997 04 17 11 49 358 12.3 -9 693.20 -43.1 -43.1 -43.2 72 -99 SPO 1997 04 17 11 50 360 11.6 -9 693.20 -43.1 -43.1 -43.2 71 -99 SPO 1997 04 17 11 51 1 11.9 -9 693.20 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 11 52 0 12.1 -9 693.20 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 11 53 0 11.5 -9 693.20 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 11 54 1 11.2 -9 693.20 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 11 55 1 10.9 -9 693.20 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 11 56 2 11.4 -9 693.20 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 57 2 11.5 -9 693.20 -43.1 -43.2 -43.2 70 -99 SPO 1997 04 17 11 58 0 11.1 -9 693.20 -43.1 -43.2 -43.2 69 -99 SPO 1997 04 17 11 59 2 10.8 -9 693.30 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 17 12 00 0 12.0 -9 693.30 -43.1 -43.0 -43.1 70 0 SPO 1997 04 17 12 01 360 11.6 -9 693.30 -43.0 -43.0 -43.0 69 -99 SPO 1997 04 17 12 02 0 11.3 -9 693.30 -43.0 -43.1 -43.1 69 -99 SPO 1997 04 17 12 03 4 12.5 -9 693.30 -43.1 -43.1 -43.1 71 -99 SPO 1997 04 17 12 04 1 11.9 -9 693.30 -43.0 -43.1 -43.1 70 -99 SPO 1997 04 17 12 05 360 11.3 -9 693.40 -43.0 -43.1 -43.2 70 -99 SPO 1997 04 17 12 06 2 11.4 -9 693.40 -43.0 -43.1 -43.2 70 -99 SPO 1997 04 17 12 07 359 11.7 -9 693.30 -43.1 -43.1 -43.2 71 -99 SPO 1997 04 17 12 08 2 11.9 -9 693.30 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 17 12 09 1 11.2 -9 693.30 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 17 12 10 1 11.3 -9 693.30 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 17 12 11 2 11.2 -9 693.40 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 17 12 12 2 10.6 -9 693.40 -43.0 -43.2 -43.2 69 -99 SPO 1997 04 17 12 13 2 11.1 -9 693.40 -43.1 -43.2 -43.3 70 -99 SPO 1997 04 17 12 14 5 10.9 -9 693.40 -43.1 -43.3 -43.3 70 -99 SPO 1997 04 17 12 15 358 10.8 -9 693.40 -43.1 -43.3 -43.2 70 -99 SPO 1997 04 17 12 16 359 11.1 -9 693.40 -43.1 -43.3 -43.2 70 -99 SPO 1997 04 17 12 17 1 11.2 -9 693.40 -43.1 -43.3 -43.2 71 -99 SPO 1997 04 17 12 18 1 10.7 -9 693.40 -43.1 -43.3 -43.2 71 -99 SPO 1997 04 17 12 19 0 10.6 -9 693.50 -43.1 -43.3 -43.2 71 -99 SPO 1997 04 17 12 20 1 11.0 -9 693.50 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 12 21 1 11.1 -9 693.40 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 12 22 358 10.9 -9 693.50 -43.1 -43.2 -43.2 71 -99 SPO 1997 04 17 12 23 2 10.1 -9 693.60 -43.2 -43.3 -43.2 72 -99 SPO 1997 04 17 12 24 5 10.4 -9 693.50 -43.2 -43.2 -43.3 71 -99 SPO 1997 04 17 12 25 2 10.8 -9 693.50 -43.1 -43.2 -43.3 71 -99 SPO 1997 04 17 12 26 1 11.9 -9 693.50 -43.1 -43.1 -43.2 71 -99 SPO 1997 04 17 12 27 358 11.6 -9 693.40 -43.1 -43.1 -43.1 72 -99 SPO 1997 04 17 12 28 356 11.8 -9 693.40 -43.0 -43.0 -43.1 72 -99 SPO 1997 04 17 12 29 358 12.3 -9 693.50 -43.0 -43.0 -43.0 72 -99 SPO 1997 04 17 12 30 357 11.8 -9 693.50 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 12 31 358 11.2 -9 693.50 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 12 32 0 11.4 -9 693.60 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 12 33 359 11.4 -9 693.60 -42.9 -43.0 -43.1 72 -99 SPO 1997 04 17 12 34 3 10.5 -9 693.60 -43.0 -43.2 -43.2 72 -99 SPO 1997 04 17 12 35 358 10.0 -9 693.60 -43.0 -43.3 -43.2 72 -99 SPO 1997 04 17 12 36 1 10.5 -9 693.60 -43.1 -43.3 -43.3 72 -99 SPO 1997 04 17 12 37 2 10.4 -9 693.60 -43.2 -43.3 -43.3 72 -99 SPO 1997 04 17 12 38 359 10.7 -9 693.70 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 12 39 0 10.7 -9 693.70 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 12 40 1 11.1 -9 693.70 -43.1 -43.1 -43.1 72 -99 SPO 1997 04 17 12 41 359 10.5 -9 693.70 -43.1 -43.1 -43.1 73 -99 SPO 1997 04 17 12 42 359 10.7 -9 693.70 -43.1 -43.1 -43.1 73 -99 SPO 1997 04 17 12 43 1 11.2 -9 693.70 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 12 44 0 11.6 -9 693.60 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 12 45 1 11.8 -9 693.60 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 12 46 1 11.2 -9 693.60 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 12 47 3 10.9 -9 693.70 -42.9 -42.9 -43.0 72 -99 SPO 1997 04 17 12 48 359 10.1 -9 693.70 -42.8 -42.9 -43.0 71 -99 SPO 1997 04 17 12 49 359 10.2 -9 693.80 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 12 50 2 10.0 -9 693.80 -42.9 -43.0 -43.1 72 -99 SPO 1997 04 17 12 51 5 10.4 -9 693.70 -43.0 -43.0 -43.1 72 -99 SPO 1997 04 17 12 52 4 10.8 -9 693.70 -43.0 -43.0 -43.1 72 -99 SPO 1997 04 17 12 53 4 10.6 -9 693.70 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 12 54 3 10.5 -9 693.80 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 12 55 1 10.8 -9 693.80 -43.0 -43.0 -43.0 74 -99 SPO 1997 04 17 12 56 360 10.8 -9 693.80 -42.9 -42.9 -42.9 73 -99 SPO 1997 04 17 12 57 359 11.0 -9 693.80 -42.9 -42.9 -42.9 75 -99 SPO 1997 04 17 12 58 358 10.6 -9 693.80 -42.8 -42.9 -42.9 74 -99 SPO 1997 04 17 12 59 3 10.2 -9 693.80 -42.8 -42.9 -42.9 72 -99 SPO 1997 04 17 13 00 3 10.0 -9 693.80 -42.8 -43.0 -43.0 72 0 SPO 1997 04 17 13 01 2 9.9 -9 693.80 -42.9 -43.1 -43.1 72 -99 SPO 1997 04 17 13 02 4 10.4 -9 693.80 -43.0 -43.1 -43.1 71 -99 SPO 1997 04 17 13 03 7 10.1 -9 693.80 -43.0 -43.1 -43.1 71 -99 SPO 1997 04 17 13 04 8 10.0 -9 693.90 -43.0 -43.2 -43.2 71 -99 SPO 1997 04 17 13 05 8 10.6 -9 693.80 -43.1 -43.2 -43.2 72 -99 SPO 1997 04 17 13 06 6 11.8 -9 693.80 -43.1 -43.0 -43.0 72 -99 SPO 1997 04 17 13 07 3 11.1 -9 693.80 -43.0 -43.0 -42.9 72 -99 SPO 1997 04 17 13 08 1 10.6 -9 693.80 -42.9 -42.9 -43.0 72 -99 SPO 1997 04 17 13 09 360 10.7 -9 693.80 -42.8 -42.9 -43.0 72 -99 SPO 1997 04 17 13 10 358 10.7 -9 693.90 -42.8 -42.9 -42.9 72 -99 SPO 1997 04 17 13 11 3 10.6 -9 693.90 -42.8 -42.8 -42.9 72 -99 SPO 1997 04 17 13 12 5 10.0 -9 693.90 -42.8 -42.9 -43.0 72 -99 SPO 1997 04 17 13 13 5 9.6 -9 693.90 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 13 14 7 10.5 -9 693.90 -42.9 -43.0 -43.0 71 -99 SPO 1997 04 17 13 15 7 10.8 -9 693.90 -42.9 -43.0 -43.1 70 -99 SPO 1997 04 17 13 16 7 10.8 -9 693.90 -43.0 -43.1 -43.1 72 -99 SPO 1997 04 17 13 17 5 10.5 -9 694.00 -42.9 -43.1 -43.1 72 -99 SPO 1997 04 17 13 18 6 9.9 -9 694.00 -43.0 -43.1 -43.1 72 -99 SPO 1997 04 17 13 19 2 10.2 -9 694.00 -43.0 -43.1 -43.1 72 -99 SPO 1997 04 17 13 20 6 10.5 -9 694.00 -43.0 -43.1 -43.1 72 -99 SPO 1997 04 17 13 21 2 10.7 -9 694.00 -43.0 -43.1 -43.1 72 -99 SPO 1997 04 17 13 22 360 11.6 -9 694.00 -43.0 -43.1 -43.0 72 -99 SPO 1997 04 17 13 23 1 11.2 -9 694.00 -43.0 -43.0 -43.0 72 -99 SPO 1997 04 17 13 24 0 11.5 -9 694.00 -43.0 -43.0 -43.0 73 -99 SPO 1997 04 17 13 25 1 10.7 -9 694.00 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 13 26 2 11.2 -9 694.00 -42.9 -43.0 -43.0 71 -99 SPO 1997 04 17 13 27 2 10.7 -9 694.00 -43.0 -43.0 -43.0 71 -99 SPO 1997 04 17 13 28 3 10.3 -9 694.10 -43.0 -43.0 -43.0 70 -99 SPO 1997 04 17 13 29 6 10.7 -9 694.00 -42.9 -42.9 -43.0 70 -99 SPO 1997 04 17 13 30 9 10.6 -9 694.00 -42.8 -42.8 -42.9 70 -99 SPO 1997 04 17 13 31 360 11.4 -9 694.00 -42.8 -42.8 -42.8 71 -99 SPO 1997 04 17 13 32 2 11.1 -9 694.10 -42.8 -42.8 -42.8 72 -99 SPO 1997 04 17 13 33 7 11.5 -9 694.00 -42.8 -42.8 -42.9 74 -99 SPO 1997 04 17 13 34 5 10.9 -9 694.00 -42.8 -42.8 -42.9 74 -99 SPO 1997 04 17 13 35 360 12.1 -9 694.00 -42.8 -42.8 -42.9 72 -99 SPO 1997 04 17 13 36 2 11.9 -9 694.00 -42.8 -42.8 -42.9 74 -99 SPO 1997 04 17 13 37 1 11.9 -9 694.00 -42.8 -42.9 -42.8 74 -99 SPO 1997 04 17 13 38 357 12.1 -9 694.00 -42.8 -42.8 -42.8 72 -99 SPO 1997 04 17 13 39 1 12.1 -9 694.00 -42.8 -42.8 -42.8 72 -99 SPO 1997 04 17 13 40 5 11.3 -9 694.00 -42.7 -42.8 -42.8 70 -99 SPO 1997 04 17 13 41 2 10.9 -9 694.10 -42.7 -42.8 -42.9 70 -99 SPO 1997 04 17 13 42 5 10.6 -9 694.10 -42.8 -42.9 -42.9 71 -99 SPO 1997 04 17 13 43 5 10.1 -9 694.10 -42.8 -43.0 -43.0 72 -99 SPO 1997 04 17 13 44 7 10.7 -9 694.10 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 17 13 45 5 11.4 -9 694.10 -42.9 -42.8 -42.9 73 -99 SPO 1997 04 17 13 46 3 11.7 -9 694.00 -42.8 -42.8 -42.9 72 -99 SPO 1997 04 17 13 47 2 11.6 -9 694.10 -42.8 -42.8 -42.9 74 -99 SPO 1997 04 17 13 48 2 11.9 -9 694.10 -42.8 -42.8 -42.8 74 -99 SPO 1997 04 17 13 49 3 11.8 -9 694.10 -42.8 -42.8 -42.8 75 -99 SPO 1997 04 17 13 50 360 11.4 -9 694.20 -42.8 -42.7 -42.8 75 -99 SPO 1997 04 17 13 51 360 12.0 -9 694.20 -42.6 -42.7 -42.8 73 -99 SPO 1997 04 17 13 52 0 11.5 -9 694.20 -42.6 -42.6 -42.8 71 -99 SPO 1997 04 17 13 53 1 11.0 -9 694.20 -42.6 -42.6 -42.7 71 -99 SPO 1997 04 17 13 54 2 10.5 -9 694.20 -42.6 -42.6 -42.7 71 -99 SPO 1997 04 17 13 55 2 10.2 -9 694.20 -42.6 -42.7 -42.8 71 -99 SPO 1997 04 17 13 56 4 10.9 -9 694.20 -42.6 -42.7 -42.8 71 -99 SPO 1997 04 17 13 57 2 10.8 -9 694.20 -42.7 -42.8 -42.8 73 -99 SPO 1997 04 17 13 58 5 10.3 -9 694.20 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 17 13 59 3 11.4 -9 694.20 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 17 14 00 3 10.6 -9 694.20 -42.7 -42.8 -42.8 74 0 SPO 1997 04 17 14 01 4 11.4 -9 694.20 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 17 14 02 4 11.4 -9 694.20 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 17 14 03 3 10.8 -9 694.20 -42.6 -42.8 -42.8 73 -99 SPO 1997 04 17 14 04 3 10.7 -9 694.20 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 17 14 05 2 10.8 -9 694.20 -42.7 -42.7 -42.8 73 -99 SPO 1997 04 17 14 06 1 10.9 -9 694.20 -42.7 -42.7 -42.8 73 -99 SPO 1997 04 17 14 07 3 12.0 -9 694.20 -42.6 -42.6 -42.6 71 -99 SPO 1997 04 17 14 08 3 11.4 -9 694.20 -42.6 -42.6 -42.7 72 -99 SPO 1997 04 17 14 09 5 12.3 -9 694.20 -42.6 -42.6 -42.6 73 -99 SPO 1997 04 17 14 10 1 10.8 -9 694.20 -42.6 -42.6 -42.7 73 -99 SPO 1997 04 17 14 11 2 10.8 -9 694.30 -42.6 -42.6 -42.7 73 -99 SPO 1997 04 17 14 12 3 10.4 -9 694.30 -42.6 -42.6 -42.7 73 -99 SPO 1997 04 17 14 13 7 11.1 -9 694.30 -42.5 -42.6 -42.7 72 -99 SPO 1997 04 17 14 14 9 11.0 -9 694.30 -42.5 -42.4 -42.5 72 -99 SPO 1997 04 17 14 15 7 11.8 -9 694.30 -42.5 -42.4 -42.6 73 -99 SPO 1997 04 17 14 16 4 11.5 -9 694.30 -42.5 -42.4 -42.6 72 -99 SPO 1997 04 17 14 17 2 12.0 -9 694.30 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 14 18 4 12.3 -9 694.30 -42.5 -42.6 -42.6 72 -99 SPO 1997 04 17 14 19 3 11.7 -9 694.30 -42.5 -42.6 -42.7 72 -99 SPO 1997 04 17 14 20 1 11.5 -9 694.40 -42.5 -42.6 -42.7 72 -99 SPO 1997 04 17 14 21 2 11.2 -9 694.40 -42.5 -42.6 -42.7 72 -99 SPO 1997 04 17 14 22 4 10.9 -9 694.40 -42.6 -42.6 -42.7 72 -99 SPO 1997 04 17 14 23 5 10.7 -9 694.40 -42.5 -42.7 -42.7 72 -99 SPO 1997 04 17 14 24 5 10.8 -9 694.40 -42.5 -42.7 -42.7 72 -99 SPO 1997 04 17 14 25 6 10.8 -9 694.40 -42.6 -42.6 -42.7 73 -99 SPO 1997 04 17 14 26 5 10.8 -9 694.50 -42.6 -42.6 -42.6 73 -99 SPO 1997 04 17 14 27 4 10.7 -9 694.50 -42.6 -42.6 -42.7 74 -99 SPO 1997 04 17 14 28 3 11.5 -9 694.40 -42.6 -42.6 -42.6 74 -99 SPO 1997 04 17 14 29 3 11.1 -9 694.50 -42.6 -42.6 -42.6 75 -99 SPO 1997 04 17 14 30 2 11.4 -9 694.50 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 14 31 2 10.9 -9 694.50 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 14 32 1 11.4 -9 694.50 -42.5 -42.5 -42.5 72 -99 SPO 1997 04 17 14 33 3 11.7 -9 694.50 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 14 34 4 11.2 -9 694.50 -42.4 -42.5 -42.6 71 -99 SPO 1997 04 17 14 35 2 11.2 -9 694.50 -42.4 -42.4 -42.6 71 -99 SPO 1997 04 17 14 36 358 10.8 -9 694.60 -42.4 -42.4 -42.6 72 -99 SPO 1997 04 17 14 37 0 10.4 -9 694.60 -42.4 -42.5 -42.6 72 -99 SPO 1997 04 17 14 38 2 10.6 -9 694.60 -42.4 -42.5 -42.5 71 -99 SPO 1997 04 17 14 39 3 11.0 -9 694.60 -42.5 -42.5 -42.5 72 -99 SPO 1997 04 17 14 40 2 10.9 -9 694.60 -42.4 -42.5 -42.5 72 -99 SPO 1997 04 17 14 41 3 10.5 -9 694.60 -42.4 -42.6 -42.6 72 -99 SPO 1997 04 17 14 42 1 11.1 -9 694.60 -42.4 -42.6 -42.6 72 -99 SPO 1997 04 17 14 43 359 10.1 -9 694.60 -42.5 -42.6 -42.6 72 -99 SPO 1997 04 17 14 44 1 11.7 -9 694.60 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 14 45 2 11.2 -9 694.60 -42.4 -42.4 -42.4 72 -99 SPO 1997 04 17 14 46 360 10.9 -9 694.60 -42.4 -42.4 -42.5 72 -99 SPO 1997 04 17 14 47 1 11.2 -9 694.50 -42.4 -42.4 -42.5 72 -99 SPO 1997 04 17 14 48 359 10.9 -9 694.60 -42.4 -42.4 -42.5 72 -99 SPO 1997 04 17 14 49 4 11.8 -9 694.50 -42.4 -42.4 -42.4 72 -99 SPO 1997 04 17 14 50 4 11.3 -9 694.50 -42.3 -42.3 -42.4 72 -99 SPO 1997 04 17 14 51 6 10.7 -9 694.60 -42.4 -42.4 -42.4 72 -99 SPO 1997 04 17 14 52 3 11.0 -9 694.60 -42.4 -42.4 -42.5 72 -99 SPO 1997 04 17 14 53 6 11.5 -9 694.70 -42.4 -42.4 -42.5 71 -99 SPO 1997 04 17 14 54 7 10.6 -9 694.70 -42.4 -42.4 -42.5 71 -99 SPO 1997 04 17 14 55 3 10.1 -9 694.80 -42.4 -42.5 -42.6 71 -99 SPO 1997 04 17 14 56 7 10.0 -9 694.80 -42.4 -42.5 -42.6 71 -99 SPO 1997 04 17 14 57 9 10.6 -9 694.80 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 17 14 58 6 10.0 -9 694.80 -42.4 -42.5 -42.6 69 -99 SPO 1997 04 17 14 59 6 10.0 -9 694.80 -42.4 -42.5 -42.6 68 -99 SPO 1997 04 17 15 00 6 9.7 -9 694.80 -42.5 -42.6 -42.6 68 0 SPO 1997 04 17 15 01 3 11.0 -9 694.80 -42.5 -42.6 -42.6 69 -99 SPO 1997 04 17 15 02 2 10.8 -9 694.80 -42.4 -42.6 -42.5 69 -99 SPO 1997 04 17 15 03 2 10.3 -9 694.80 -42.5 -42.6 -42.6 72 -99 SPO 1997 04 17 15 04 4 10.5 -9 694.80 -42.4 -42.6 -42.5 72 -99 SPO 1997 04 17 15 05 4 10.3 -9 694.80 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 15 06 5 10.7 -9 694.80 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 15 07 4 10.1 -9 694.80 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 15 08 6 9.9 -9 694.90 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 15 09 6 10.2 -9 694.80 -42.5 -42.6 -42.6 73 -99 SPO 1997 04 17 15 10 4 10.6 -9 694.90 -42.5 -42.6 -42.6 72 -99 SPO 1997 04 17 15 11 3 10.7 -9 694.90 -42.5 -42.5 -42.5 72 -99 SPO 1997 04 17 15 12 4 10.1 -9 695.00 -42.5 -42.5 -42.5 72 -99 SPO 1997 04 17 15 13 5 9.9 -9 695.00 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 15 14 3 10.1 -9 695.00 -42.5 -42.5 -42.6 72 -99 SPO 1997 04 17 15 15 4 9.9 -9 695.00 -42.5 -42.5 -42.5 73 -99 SPO 1997 04 17 15 16 3 10.4 -9 695.00 -42.4 -42.5 -42.5 73 -99 SPO 1997 04 17 15 17 5 10.6 -9 695.00 -42.4 -42.5 -42.5 74 -99 SPO 1997 04 17 15 18 3 10.2 -9 694.90 -42.4 -42.4 -42.5 75 -99 SPO 1997 04 17 15 19 4 9.9 -9 695.00 -42.4 -42.4 -42.5 76 -99 SPO 1997 04 17 15 20 5 10.8 -9 694.90 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 17 15 21 6 11.2 -9 694.90 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 17 15 22 3 10.3 -9 694.90 -42.4 -42.4 -42.4 76 -99 SPO 1997 04 17 15 23 2 11.2 -9 694.90 -42.3 -42.5 -42.4 74 -99 SPO 1997 04 17 15 24 0 11.0 -9 694.90 -42.3 -42.5 -42.4 74 -99 SPO 1997 04 17 15 25 3 10.9 -9 694.90 -42.3 -42.5 -42.4 73 -99 SPO 1997 04 17 15 26 2 10.7 -9 694.90 -42.3 -42.5 -42.5 67 -99 SPO 1997 04 17 15 27 0 11.2 -9 694.90 -42.4 -42.5 -42.4 65 -99 SPO 1997 04 17 15 28 360 10.9 -9 695.00 -42.4 -42.5 -42.5 65 -99 SPO 1997 04 17 15 29 359 11.0 -9 695.00 -42.4 -42.5 -42.5 66 -99 SPO 1997 04 17 15 30 360 11.4 -9 694.90 -42.4 -42.5 -42.5 66 -99 SPO 1997 04 17 15 31 2 10.8 -9 694.90 -42.4 -42.5 -42.5 68 -99 SPO 1997 04 17 15 32 3 10.8 -9 695.00 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 33 4 10.2 -9 695.00 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 34 5 10.9 -9 695.00 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 35 2 11.4 -9 694.90 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 36 2 10.8 -9 695.00 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 37 2 11.2 -9 694.90 -42.4 -42.5 -42.5 69 -99 SPO 1997 04 17 15 38 1 11.7 -9 694.90 -42.3 -42.4 -42.4 69 -99 SPO 1997 04 17 15 39 360 12.2 -9 694.90 -42.3 -42.4 -42.4 69 -99 SPO 1997 04 17 15 40 1 11.8 -9 694.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 17 15 41 1 11.8 -9 695.00 -42.3 -42.3 -42.4 71 -99 SPO 1997 04 17 15 42 360 10.9 -9 695.00 -42.3 -42.4 -42.4 71 -99 SPO 1997 04 17 15 43 359 11.0 -9 695.00 -42.3 -42.4 -42.4 72 -99 SPO 1997 04 17 15 44 359 11.3 -9 695.00 -42.3 -42.5 -42.4 73 -99 SPO 1997 04 17 15 45 2 11.2 -9 695.00 -42.3 -42.5 -42.4 73 -99 SPO 1997 04 17 15 46 4 11.6 -9 694.80 -42.3 -42.4 -42.4 73 -99 SPO 1997 04 17 15 47 358 11.0 -9 695.00 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 17 15 48 1 11.5 -9 694.90 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 17 15 49 360 11.1 -9 694.90 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 17 15 50 1 11.1 -9 695.00 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 17 15 51 360 11.1 -9 695.00 -42.3 -42.4 -42.4 73 -99 SPO 1997 04 17 15 52 357 11.2 -9 695.00 -42.3 -42.4 -42.4 73 -99 SPO 1997 04 17 15 53 1 11.4 -9 695.00 -42.3 -42.4 -42.4 73 -99 SPO 1997 04 17 15 54 359 11.3 -9 695.00 -42.3 -42.3 -42.3 74 -99 SPO 1997 04 17 15 55 1 11.4 -9 694.90 -42.3 -42.3 -42.3 74 -99 SPO 1997 04 17 15 56 357 11.6 -9 694.90 -42.2 -42.3 -42.3 74 -99 SPO 1997 04 17 15 57 360 12.2 -9 695.00 -42.2 -42.2 -42.3 74 -99 SPO 1997 04 17 15 58 359 11.6 -9 694.90 -42.2 -42.2 -42.3 74 -99 SPO 1997 04 17 15 59 0 11.2 -9 694.90 -42.2 -42.3 -42.3 73 -99 SPO 1997 04 17 16 00 0 11.5 -9 695.00 -42.1 -42.2 -42.3 73 0 SPO 1997 04 17 16 01 1 11.6 -9 695.00 -42.1 -42.2 -42.3 73 -99 SPO 1997 04 17 16 02 360 11.1 -9 695.00 -42.1 -42.2 -42.3 73 -99 SPO 1997 04 17 16 03 1 11.4 -9 695.00 -42.2 -42.3 -42.3 73 -99 SPO 1997 04 17 16 04 2 11.8 -9 695.00 -42.2 -42.3 -42.3 73 -99 SPO 1997 04 17 16 05 0 11.8 -9 695.00 -42.2 -42.4 -42.3 73 -99 SPO 1997 04 17 16 06 2 11.5 -9 695.00 -42.2 -42.4 -42.3 73 -99 SPO 1997 04 17 16 07 1 11.2 -9 695.00 -42.2 -42.3 -42.3 73 -99 SPO 1997 04 17 16 08 1 11.4 -9 695.00 -42.2 -42.3 -42.3 73 -99 SPO 1997 04 17 16 09 2 10.8 -9 695.00 -42.2 -42.4 -42.4 73 -99 SPO 1997 04 17 16 10 1 11.7 -9 695.00 -42.2 -42.4 -42.4 73 -99 SPO 1997 04 17 16 11 3 11.5 -9 695.00 -42.2 -42.4 -42.4 73 -99 SPO 1997 04 17 16 12 2 12.2 -9 695.00 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 17 16 13 360 11.2 -9 695.00 -42.3 -42.4 -42.3 74 -99 SPO 1997 04 17 16 14 0 11.8 -9 695.00 -42.3 -42.4 -42.4 73 -99 SPO 1997 04 17 16 15 1 11.5 -9 695.00 -42.3 -42.3 -42.3 73 -99 SPO 1997 04 17 16 16 1 11.6 -9 695.00 -42.3 -42.3 -42.3 73 -99 SPO 1997 04 17 16 17 1 11.7 -9 695.00 -42.2 -42.3 -42.3 72 -99 SPO 1997 04 17 16 18 359 11.7 -9 695.00 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 17 16 19 359 11.7 -9 695.00 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 17 16 20 357 11.9 -9 695.10 -42.2 -42.1 -42.2 71 -99 SPO 1997 04 17 16 21 358 11.2 -9 695.10 -42.1 -42.1 -42.2 71 -99 SPO 1997 04 17 16 22 356 11.5 -9 695.10 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 17 16 23 356 11.2 -9 695.10 -42.0 -42.1 -42.1 71 -99 SPO 1997 04 17 16 24 357 10.9 -9 695.10 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 17 16 25 355 10.5 -9 695.10 -42.0 -42.1 -42.1 71 -99 SPO 1997 04 17 16 26 355 10.3 -9 695.20 -42.0 -42.2 -42.2 72 -99 SPO 1997 04 17 16 27 358 10.7 -9 695.20 -42.0 -42.2 -42.2 72 -99 SPO 1997 04 17 16 28 358 11.5 -9 695.20 -42.1 -42.2 -42.2 73 -99 SPO 1997 04 17 16 29 359 11.0 -9 695.20 -42.1 -42.2 -42.2 72 -99 SPO 1997 04 17 16 30 358 11.0 -9 695.10 -42.1 -42.2 -42.2 72 -99 SPO 1997 04 17 16 31 357 11.8 -9 695.10 -42.1 -42.2 -42.2 72 -99 SPO 1997 04 17 16 32 356 11.8 -9 695.10 -42.1 -42.1 -42.1 72 -99 SPO 1997 04 17 16 33 358 11.6 -9 695.20 -42.1 -42.1 -42.1 72 -99 SPO 1997 04 17 16 34 357 10.8 -9 695.20 -42.0 -42.1 -42.1 72 -99 SPO 1997 04 17 16 35 358 11.4 -9 695.20 -42.0 -42.1 -42.1 72 -99 SPO 1997 04 17 16 36 359 11.5 -9 695.20 -42.0 -42.1 -42.1 73 -99 SPO 1997 04 17 16 37 1 11.3 -9 695.20 -42.0 -42.1 -42.1 73 -99 SPO 1997 04 17 16 38 1 11.7 -9 695.20 -42.0 -42.1 -42.1 73 -99 SPO 1997 04 17 16 39 360 11.5 -9 695.20 -42.0 -42.0 -42.1 73 -99 SPO 1997 04 17 16 40 359 11.9 -9 695.30 -42.0 -42.0 -42.0 73 -99 SPO 1997 04 17 16 41 359 12.2 -9 695.20 -42.0 -42.0 -42.0 73 -99 SPO 1997 04 17 16 42 357 12.1 -9 695.20 -42.0 -41.9 -42.0 73 -99 SPO 1997 04 17 16 43 357 12.1 -9 695.30 -41.9 -41.9 -42.0 72 -99 SPO 1997 04 17 16 44 358 11.4 -9 695.30 -41.9 -41.9 -41.9 72 -99 SPO 1997 04 17 16 45 356 11.9 -9 695.30 -41.9 -41.9 -41.9 72 -99 SPO 1997 04 17 16 46 357 11.1 -9 695.30 -41.8 -41.9 -41.9 72 -99 SPO 1997 04 17 16 47 359 11.6 -9 695.30 -41.8 -42.0 -41.9 72 -99 SPO 1997 04 17 16 48 358 11.9 -9 695.30 -41.8 -41.9 -41.9 72 -99 SPO 1997 04 17 16 49 357 12.1 -9 695.40 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 16 50 360 11.5 -9 695.40 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 16 51 1 11.9 -9 695.30 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 16 52 360 11.4 -9 695.30 -41.8 -42.0 -42.0 73 -99 SPO 1997 04 17 16 53 360 11.6 -9 695.30 -41.8 -42.0 -42.0 73 -99 SPO 1997 04 17 16 54 1 11.4 -9 695.30 -41.9 -42.0 -42.0 74 -99 SPO 1997 04 17 16 55 359 11.6 -9 695.30 -41.9 -41.9 -41.9 74 -99 SPO 1997 04 17 16 56 359 12.1 -9 695.30 -41.8 -41.9 -41.9 72 -99 SPO 1997 04 17 16 57 359 12.3 -9 695.20 -41.8 -41.8 -41.8 71 -99 SPO 1997 04 17 16 58 358 12.4 -9 695.30 -41.8 -41.8 -41.8 71 -99 SPO 1997 04 17 16 59 356 12.4 -9 695.40 -41.8 -41.8 -41.8 71 -99 SPO 1997 04 17 17 00 359 11.4 -9 695.30 -41.8 -41.8 -41.8 72 0 SPO 1997 04 17 17 01 0 11.8 -9 695.30 -41.8 -41.8 -41.9 73 -99 SPO 1997 04 17 17 02 358 11.5 -9 695.40 -41.8 -41.8 -41.9 74 -99 SPO 1997 04 17 17 03 0 11.6 -9 695.30 -41.8 -41.9 -41.9 74 -99 SPO 1997 04 17 17 04 359 11.8 -9 695.30 -41.8 -41.9 -41.9 74 -99 SPO 1997 04 17 17 05 357 14.0 -9 695.30 -41.8 -41.8 -41.8 74 -99 SPO 1997 04 17 17 06 359 11.9 -9 695.30 -41.8 -41.8 -41.9 73 -99 SPO 1997 04 17 17 07 357 12.4 -9 695.40 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 17 08 360 11.4 -9 695.40 -41.8 -42.0 -42.0 73 -99 SPO 1997 04 17 17 09 358 11.7 -9 695.30 -41.9 -42.0 -42.0 73 -99 SPO 1997 04 17 17 10 359 11.4 -9 695.30 -41.9 -42.1 -42.1 73 -99 SPO 1997 04 17 17 11 358 12.1 -9 695.30 -41.9 -42.1 -42.1 71 -99 SPO 1997 04 17 17 12 356 12.0 -9 695.40 -41.9 -42.1 -42.1 71 -99 SPO 1997 04 17 17 13 356 12.1 -9 695.30 -41.9 -42.1 -42.1 72 -99 SPO 1997 04 17 17 14 356 12.2 -9 695.30 -41.9 -42.1 -42.0 72 -99 SPO 1997 04 17 17 15 356 13.0 -9 695.30 -41.9 -42.0 -42.0 73 -99 SPO 1997 04 17 17 16 354 12.4 -9 695.30 -41.9 -42.0 -41.9 73 -99 SPO 1997 04 17 17 17 355 12.0 -9 695.30 -41.9 -42.0 -41.9 73 -99 SPO 1997 04 17 17 18 357 11.8 -9 695.30 -41.9 -42.0 -42.0 74 -99 SPO 1997 04 17 17 19 356 12.4 -9 695.30 -41.9 -42.0 -42.0 74 -99 SPO 1997 04 17 17 20 358 12.0 -9 695.30 -41.9 -42.1 -42.1 75 -99 SPO 1997 04 17 17 21 357 11.7 -9 695.30 -42.0 -42.1 -42.1 75 -99 SPO 1997 04 17 17 22 359 12.1 -9 695.30 -42.0 -42.0 -42.1 74 -99 SPO 1997 04 17 17 23 356 12.3 -9 695.30 -42.0 -42.0 -42.1 74 -99 SPO 1997 04 17 17 24 357 12.8 -9 695.30 -42.0 -42.0 -42.1 73 -99 SPO 1997 04 17 17 25 358 12.7 -9 695.30 -42.0 -42.0 -42.0 73 -99 SPO 1997 04 17 17 26 356 11.9 -9 695.30 -42.0 -42.0 -42.0 73 -99 SPO 1997 04 17 17 27 353 11.4 -9 695.40 -41.9 -42.0 -42.0 73 -99 SPO 1997 04 17 17 28 354 11.8 -9 695.30 -41.9 -42.0 -42.0 73 -99 SPO 1997 04 17 17 29 355 12.0 -9 695.30 -41.9 -42.0 -42.0 73 -99 SPO 1997 04 17 17 30 356 12.5 -9 695.30 -41.9 -42.0 -41.9 73 -99 SPO 1997 04 17 17 31 357 12.2 -9 695.20 -41.8 -42.0 -41.9 73 -99 SPO 1997 04 17 17 32 354 12.6 -9 695.30 -41.8 -42.0 -41.9 73 -99 SPO 1997 04 17 17 33 355 12.5 -9 695.20 -41.8 -41.9 -41.8 74 -99 SPO 1997 04 17 17 34 352 12.4 -9 695.30 -41.8 -41.9 -41.8 74 -99 SPO 1997 04 17 17 35 353 12.3 -9 695.30 -41.8 -41.9 -41.8 74 -99 SPO 1997 04 17 17 36 349 11.7 -9 695.40 -41.7 -41.9 -41.8 73 -99 SPO 1997 04 17 17 37 350 12.1 -9 695.40 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 17 38 354 11.8 -9 695.30 -41.8 -41.9 -41.9 73 -99 SPO 1997 04 17 17 39 358 12.5 -9 695.30 -41.8 -41.8 -41.9 73 -99 SPO 1997 04 17 17 40 357 12.9 -9 695.30 -41.7 -41.8 -41.8 73 -99 SPO 1997 04 17 17 41 353 12.0 -9 695.40 -41.7 -41.8 -41.8 74 -99 SPO 1997 04 17 17 42 356 12.6 -9 695.30 -41.7 -41.8 -41.9 74 -99 SPO 1997 04 17 17 43 353 13.1 -9 695.30 -41.7 -41.8 -41.8 74 -99 SPO 1997 04 17 17 44 356 12.7 -9 695.30 -41.7 -41.7 -41.8 75 -99 SPO 1997 04 17 17 45 352 12.6 -9 695.30 -41.7 -41.7 -41.7 76 -99 SPO 1997 04 17 17 46 354 12.5 -9 695.30 -41.7 -41.7 -41.7 76 -99 SPO 1997 04 17 17 47 354 12.0 -9 695.30 -41.7 -41.7 -41.8 76 -99 SPO 1997 04 17 17 48 356 12.2 -9 695.20 -41.7 -41.7 -41.8 75 -99 SPO 1997 04 17 17 49 352 12.3 -9 695.30 -41.7 -41.7 -41.8 75 -99 SPO 1997 04 17 17 50 353 11.6 -9 695.30 -41.7 -41.7 -41.8 74 -99 SPO 1997 04 17 17 51 354 11.9 -9 695.30 -41.7 -41.8 -41.8 74 -99 SPO 1997 04 17 17 52 353 12.0 -9 695.30 -41.6 -41.8 -41.8 73 -99 SPO 1997 04 17 17 53 352 12.4 -9 695.30 -41.6 -41.8 -41.7 74 -99 SPO 1997 04 17 17 54 353 12.9 -9 695.30 -41.6 -41.8 -41.7 75 -99 SPO 1997 04 17 17 55 352 13.1 -9 695.30 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 17 56 352 12.5 -9 695.30 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 17 57 352 12.3 -9 695.40 -41.6 -41.8 -41.7 76 -99 SPO 1997 04 17 17 58 351 11.9 -9 695.40 -41.6 -41.8 -41.7 77 -99 SPO 1997 04 17 17 59 353 12.4 -9 695.40 -41.6 -41.7 -41.7 77 -99 SPO 1997 04 17 18 00 353 12.1 -9 695.40 -41.6 -41.7 -41.7 78 0 SPO 1997 04 17 18 01 351 11.9 -9 695.40 -41.6 -41.7 -41.7 78 -99 SPO 1997 04 17 18 02 353 11.9 -9 695.40 -41.6 -41.7 -41.7 77 -99 SPO 1997 04 17 18 03 353 11.8 -9 695.40 -41.6 -41.7 -41.7 76 -99 SPO 1997 04 17 18 04 353 12.3 -9 695.40 -41.6 -41.6 -41.7 75 -99 SPO 1997 04 17 18 05 353 12.1 -9 695.30 -41.6 -41.6 -41.7 75 -99 SPO 1997 04 17 18 06 351 12.8 -9 695.40 -41.6 -41.6 -41.6 75 -99 SPO 1997 04 17 18 07 351 12.1 -9 695.40 -41.5 -41.6 -41.6 75 -99 SPO 1997 04 17 18 08 355 11.5 -9 695.50 -41.6 -41.6 -41.6 76 -99 SPO 1997 04 17 18 09 355 11.2 -9 695.50 -41.6 -41.6 -41.7 76 -99 SPO 1997 04 17 18 10 356 11.3 -9 695.60 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 11 353 11.9 -9 695.50 -41.6 -41.6 -41.7 74 -99 SPO 1997 04 17 18 12 353 12.2 -9 695.50 -41.6 -41.7 -41.7 73 -99 SPO 1997 04 17 18 13 352 11.4 -9 695.50 -41.6 -41.7 -41.6 74 -99 SPO 1997 04 17 18 14 352 12.2 -9 695.60 -41.6 -41.7 -41.7 74 -99 SPO 1997 04 17 18 15 354 12.4 -9 695.60 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 16 354 11.7 -9 695.60 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 17 356 11.5 -9 695.60 -41.6 -41.7 -41.7 74 -99 SPO 1997 04 17 18 18 356 11.4 -9 695.60 -41.6 -41.8 -41.7 74 -99 SPO 1997 04 17 18 19 356 11.6 -9 695.70 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 20 358 11.2 -9 695.60 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 21 355 11.3 -9 695.60 -41.6 -41.7 -41.6 75 -99 SPO 1997 04 17 18 22 354 12.0 -9 695.60 -41.6 -41.7 -41.6 75 -99 SPO 1997 04 17 18 23 353 12.1 -9 695.70 -41.6 -41.6 -41.6 75 -99 SPO 1997 04 17 18 24 353 10.8 -9 695.70 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 25 358 11.0 -9 695.70 -41.5 -41.6 -41.6 75 -99 SPO 1997 04 17 18 26 358 10.6 -9 695.70 -41.5 -41.6 -41.7 75 -99 SPO 1997 04 17 18 27 356 10.4 -9 695.80 -41.6 -41.7 -41.7 76 -99 SPO 1997 04 17 18 28 355 10.8 -9 695.80 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 17 18 29 353 12.4 -9 695.70 -41.6 -41.6 -41.6 74 -99 SPO 1997 04 17 18 30 351 12.0 -9 695.70 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 31 350 11.4 -9 695.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 32 353 11.1 -9 695.80 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 33 355 11.0 -9 695.80 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 34 357 10.9 -9 695.80 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 35 352 11.7 -9 695.80 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 36 354 11.7 -9 695.80 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 18 37 355 11.8 -9 695.80 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 18 38 355 11.7 -9 695.80 -41.5 -41.7 -41.6 74 -99 SPO 1997 04 17 18 39 353 12.6 -9 695.80 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 40 351 11.5 -9 695.80 -41.5 -41.7 -41.6 74 -99 SPO 1997 04 17 18 41 351 12.2 -9 695.80 -41.5 -41.7 -41.6 74 -99 SPO 1997 04 17 18 42 351 11.8 -9 695.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 43 351 11.8 -9 695.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 44 351 12.7 -9 695.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 45 351 11.3 -9 695.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 46 351 11.0 -9 695.90 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 18 47 354 11.1 -9 695.90 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 48 353 11.3 -9 695.90 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 18 49 353 11.8 -9 695.90 -41.5 -41.5 -41.5 75 -99 SPO 1997 04 17 18 50 354 10.9 -9 696.00 -41.5 -41.5 -41.6 75 -99 SPO 1997 04 17 18 51 354 10.5 -9 696.00 -41.5 -41.6 -41.6 76 -99 SPO 1997 04 17 18 52 352 10.0 -9 696.00 -41.5 -41.6 -41.6 75 -99 SPO 1997 04 17 18 53 354 11.0 -9 696.00 -41.5 -41.5 -41.6 75 -99 SPO 1997 04 17 18 54 354 11.1 -9 696.00 -41.5 -41.5 -41.6 74 -99 SPO 1997 04 17 18 55 350 12.9 -9 695.90 -41.5 -41.5 -41.5 73 -99 SPO 1997 04 17 18 56 352 11.9 -9 695.90 -41.5 -41.6 -41.5 73 -99 SPO 1997 04 17 18 57 353 11.5 -9 695.90 -41.5 -41.6 -41.5 73 -99 SPO 1997 04 17 18 58 349 12.1 -9 695.90 -41.5 -41.6 -41.5 73 -99 SPO 1997 04 17 18 59 350 11.9 -9 695.90 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 00 349 11.2 -9 695.90 -41.5 -41.7 -41.6 73 0 SPO 1997 04 17 19 01 350 11.0 -9 696.00 -41.5 -41.7 -41.6 74 -99 SPO 1997 04 17 19 02 348 11.4 -9 696.00 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 19 03 348 11.2 -9 695.90 -41.5 -41.6 -41.6 76 -99 SPO 1997 04 17 19 04 348 11.4 -9 696.00 -41.6 -41.7 -41.6 77 -99 SPO 1997 04 17 19 05 350 11.4 -9 696.00 -41.6 -41.6 -41.6 78 -99 SPO 1997 04 17 19 06 353 10.9 -9 696.00 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 17 19 07 352 11.0 -9 696.00 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 17 19 08 353 11.6 -9 696.00 -41.5 -41.6 -41.6 76 -99 SPO 1997 04 17 19 09 352 11.6 -9 696.00 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 10 350 11.3 -9 696.00 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 11 350 11.0 -9 696.10 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 12 350 10.5 -9 696.10 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 13 349 11.5 -9 696.10 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 14 350 11.3 -9 696.10 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 15 352 10.7 -9 696.10 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 16 353 10.0 -9 696.10 -41.5 -41.6 -41.6 75 -99 SPO 1997 04 17 19 17 352 9.9 -9 696.10 -41.5 -41.6 -41.6 75 -99 SPO 1997 04 17 19 18 350 11.1 -9 696.20 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 19 19 350 10.6 -9 696.20 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 19 20 352 9.9 -9 696.20 -41.5 -41.7 -41.6 75 -99 SPO 1997 04 17 19 21 352 10.3 -9 696.20 -41.5 -41.7 -41.6 76 -99 SPO 1997 04 17 19 22 353 10.1 -9 696.20 -41.6 -41.7 -41.6 77 -99 SPO 1997 04 17 19 23 350 11.1 -9 696.20 -41.6 -41.7 -41.6 75 -99 SPO 1997 04 17 19 24 350 10.6 -9 696.20 -41.5 -41.7 -41.6 73 -99 SPO 1997 04 17 19 25 349 11.1 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 26 348 10.8 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 27 347 10.3 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 28 348 10.6 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 29 348 10.5 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 30 349 10.3 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 31 347 11.3 -9 696.20 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 32 349 11.5 -9 696.20 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 33 350 10.7 -9 696.20 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 34 351 9.9 -9 696.20 -41.5 -41.6 -41.6 74 -99 SPO 1997 04 17 19 35 352 9.5 -9 696.30 -41.5 -41.5 -41.6 73 -99 SPO 1997 04 17 19 36 350 10.0 -9 696.30 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 19 37 352 9.5 -9 696.30 -41.5 -41.6 -41.6 72 -99 SPO 1997 04 17 19 38 350 9.7 -9 696.30 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 39 351 9.4 -9 696.30 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 40 349 10.1 -9 696.30 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 41 349 10.2 -9 696.30 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 42 351 10.0 -9 696.40 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 43 349 10.1 -9 696.40 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 19 44 349 9.4 -9 696.40 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 19 45 349 10.1 -9 696.40 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 19 46 348 10.5 -9 696.40 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 19 47 346 10.3 -9 696.40 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 48 346 10.1 -9 696.40 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 49 348 10.5 -9 696.40 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 19 50 346 9.7 -9 696.40 -41.5 -41.6 -41.6 70 -99 SPO 1997 04 17 19 51 346 10.1 -9 696.40 -41.5 -41.6 -41.5 70 -99 SPO 1997 04 17 19 52 347 10.1 -9 696.40 -41.5 -41.5 -41.5 70 -99 SPO 1997 04 17 19 53 348 10.0 -9 696.40 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 19 54 347 10.0 -9 696.40 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 19 55 348 9.7 -9 696.40 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 19 56 348 10.1 -9 696.40 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 19 57 347 10.0 -9 696.40 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 19 58 348 9.3 -9 696.40 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 19 59 346 9.2 -9 696.50 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 20 00 346 9.3 -9 696.50 -41.4 -41.5 -41.5 71 0 SPO 1997 04 17 20 01 345 10.1 -9 696.50 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 20 02 344 9.6 -9 696.50 -41.4 -41.5 -41.4 70 -99 SPO 1997 04 17 20 03 342 9.9 -9 696.60 -41.4 -41.5 -41.4 70 -99 SPO 1997 04 17 20 04 346 9.3 -9 696.60 -41.4 -41.5 -41.4 70 -99 SPO 1997 04 17 20 05 344 8.9 -9 696.60 -41.3 -41.5 -41.4 70 -99 SPO 1997 04 17 20 06 344 9.5 -9 696.60 -41.4 -41.5 -41.4 72 -99 SPO 1997 04 17 20 07 345 9.6 -9 696.60 -41.4 -41.5 -41.4 72 -99 SPO 1997 04 17 20 08 346 9.3 -9 696.60 -41.4 -41.5 -41.5 73 -99 SPO 1997 04 17 20 09 344 9.6 -9 696.60 -41.4 -41.5 -41.5 73 -99 SPO 1997 04 17 20 10 346 8.5 -9 696.70 -41.4 -41.6 -41.5 73 -99 SPO 1997 04 17 20 11 348 8.8 -9 696.70 -41.4 -41.6 -41.5 72 -99 SPO 1997 04 17 20 12 348 9.3 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 13 346 9.5 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 14 346 9.8 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 15 347 9.4 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 16 347 8.9 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 17 347 8.6 -9 696.70 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 18 348 9.6 -9 696.80 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 20 19 347 9.0 -9 696.80 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 20 20 347 9.8 -9 696.70 -41.5 -41.5 -41.5 73 -99 SPO 1997 04 17 20 21 348 10.3 -9 696.70 -41.4 -41.4 -41.5 72 -99 SPO 1997 04 17 20 22 345 9.9 -9 696.70 -41.4 -41.4 -41.5 73 -99 SPO 1997 04 17 20 23 345 9.6 -9 696.80 -41.4 -41.4 -41.5 73 -99 SPO 1997 04 17 20 24 345 9.4 -9 696.80 -41.4 -41.5 -41.5 73 -99 SPO 1997 04 17 20 25 346 8.3 -9 696.80 -41.4 -41.5 -41.5 73 -99 SPO 1997 04 17 20 26 346 9.5 -9 696.80 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 20 27 345 9.1 -9 696.80 -41.5 -41.5 -41.5 73 -99 SPO 1997 04 17 20 28 346 9.1 -9 696.80 -41.5 -41.6 -41.6 73 -99 SPO 1997 04 17 20 29 346 9.1 -9 696.80 -41.5 -41.6 -41.6 72 -99 SPO 1997 04 17 20 30 346 8.8 -9 696.80 -41.5 -41.6 -41.6 72 -99 SPO 1997 04 17 20 31 346 8.8 -9 696.80 -41.5 -41.6 -41.6 71 -99 SPO 1997 04 17 20 32 344 8.4 -9 696.90 -41.6 -41.6 -41.7 72 -99 SPO 1997 04 17 20 33 346 8.5 -9 696.90 -41.6 -41.6 -41.7 72 -99 SPO 1997 04 17 20 34 347 8.4 -9 696.90 -41.6 -41.6 -41.7 73 -99 SPO 1997 04 17 20 35 349 8.0 -9 696.90 -41.6 -41.6 -41.7 73 -99 SPO 1997 04 17 20 36 350 7.5 -9 697.00 -41.6 -41.7 -41.7 72 -99 SPO 1997 04 17 20 37 350 8.1 -9 697.00 -41.6 -41.6 -41.7 72 -99 SPO 1997 04 17 20 38 352 7.7 -9 697.00 -41.6 -41.7 -41.7 72 -99 SPO 1997 04 17 20 39 352 7.7 -9 697.00 -41.6 -41.7 -41.7 72 -99 SPO 1997 04 17 20 40 352 7.8 -9 697.00 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 17 20 41 355 7.6 -9 697.00 -41.6 -41.7 -41.7 72 -99 SPO 1997 04 17 20 42 355 7.4 -9 697.10 -41.7 -41.7 -41.7 72 -99 SPO 1997 04 17 20 43 355 7.4 -9 697.10 -41.7 -41.7 -41.8 71 -99 SPO 1997 04 17 20 44 355 7.6 -9 697.10 -41.7 -41.7 -41.7 70 -99 SPO 1997 04 17 20 45 352 7.2 -9 697.10 -41.6 -41.7 -41.7 69 -99 SPO 1997 04 17 20 46 352 7.5 -9 697.10 -41.6 -41.8 -41.7 69 -99 SPO 1997 04 17 20 47 351 7.8 -9 697.10 -41.6 -41.8 -41.7 69 -99 SPO 1997 04 17 20 48 351 7.8 -9 697.10 -41.6 -41.7 -41.6 70 -99 SPO 1997 04 17 20 49 352 7.4 -9 697.10 -41.6 -41.7 -41.6 71 -99 SPO 1997 04 17 20 50 351 7.4 -9 697.10 -41.6 -41.7 -41.6 72 -99 SPO 1997 04 17 20 51 352 7.4 -9 697.20 -41.5 -41.6 -41.6 72 -99 SPO 1997 04 17 20 52 352 7.4 -9 697.10 -41.5 -41.6 -41.5 72 -99 SPO 1997 04 17 20 53 352 7.1 -9 697.20 -41.4 -41.6 -41.5 72 -99 SPO 1997 04 17 20 54 350 7.9 -9 697.10 -41.4 -41.6 -41.5 72 -99 SPO 1997 04 17 20 55 351 7.7 -9 697.20 -41.4 -41.6 -41.5 72 -99 SPO 1997 04 17 20 56 353 8.2 -9 697.20 -41.4 -41.6 -41.5 72 -99 SPO 1997 04 17 20 57 354 8.0 -9 697.20 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 20 58 353 8.0 -9 697.20 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 20 59 353 8.2 -9 697.20 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 21 00 356 7.5 -9 697.20 -41.4 -41.5 -41.5 70 0 SPO 1997 04 17 21 01 355 7.6 -9 697.20 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 21 02 355 8.0 -9 697.20 -41.4 -41.5 -41.5 71 -99 SPO 1997 04 17 21 03 354 8.5 -9 697.10 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 21 04 354 8.3 -9 697.10 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 21 05 354 8.0 -9 697.10 -41.4 -41.5 -41.4 72 -99 SPO 1997 04 17 21 06 354 8.6 -9 697.10 -41.4 -41.4 -41.4 72 -99 SPO 1997 04 17 21 07 353 8.3 -9 697.10 -41.4 -41.4 -41.4 72 -99 SPO 1997 04 17 21 08 352 8.8 -9 697.10 -41.3 -41.4 -41.3 72 -99 SPO 1997 04 17 21 09 351 8.8 -9 697.10 -41.3 -41.4 -41.3 73 -99 SPO 1997 04 17 21 10 352 8.8 -9 697.10 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 21 11 351 8.8 -9 697.10 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 21 12 351 8.8 -9 697.10 -41.2 -41.4 -41.3 70 -99 SPO 1997 04 17 21 13 351 8.8 -9 697.10 -41.2 -41.4 -41.3 70 -99 SPO 1997 04 17 21 14 353 8.8 -9 697.10 -41.3 -41.5 -41.4 70 -99 SPO 1997 04 17 21 15 353 9.0 -9 697.10 -41.3 -41.5 -41.4 71 -99 SPO 1997 04 17 21 16 353 8.9 -9 697.10 -41.3 -41.5 -41.4 71 -99 SPO 1997 04 17 21 17 352 8.8 -9 697.10 -41.4 -41.5 -41.5 73 -99 SPO 1997 04 17 21 18 352 9.0 -9 697.20 -41.4 -41.5 -41.5 72 -99 SPO 1997 04 17 21 19 349 8.6 -9 697.20 -41.4 -41.4 -41.4 72 -99 SPO 1997 04 17 21 20 349 9.2 -9 697.20 -41.4 -41.4 -41.4 73 -99 SPO 1997 04 17 21 21 348 9.7 -9 697.20 -41.3 -41.4 -41.4 72 -99 SPO 1997 04 17 21 22 349 9.7 -9 697.20 -41.3 -41.3 -41.3 72 -99 SPO 1997 04 17 21 23 350 10.0 -9 697.20 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 24 350 9.5 -9 697.20 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 25 350 9.5 -9 697.20 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 21 26 352 8.7 -9 697.20 -41.2 -41.3 -41.4 70 -99 SPO 1997 04 17 21 27 354 9.1 -9 697.20 -41.3 -41.3 -41.4 70 -99 SPO 1997 04 17 21 28 353 9.2 -9 697.20 -41.3 -41.3 -41.4 71 -99 SPO 1997 04 17 21 29 354 9.4 -9 697.20 -41.3 -41.3 -41.3 71 -99 SPO 1997 04 17 21 30 354 9.6 -9 697.20 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 21 31 352 10.1 -9 697.20 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 32 351 10.1 -9 697.20 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 33 355 9.0 -9 697.20 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 34 354 9.2 -9 697.30 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 21 35 355 9.4 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 36 353 9.6 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 37 352 9.6 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 38 353 9.1 -9 697.30 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 39 355 8.8 -9 697.30 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 21 40 355 9.5 -9 697.30 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 21 41 355 9.9 -9 697.30 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 21 42 355 10.2 -9 697.30 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 43 355 9.7 -9 697.30 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 21 44 355 10.0 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 45 354 9.5 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 46 353 9.1 -9 697.30 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 21 47 354 9.4 -9 697.30 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 21 48 354 9.8 -9 697.30 -41.2 -41.3 -41.2 72 -99 SPO 1997 04 17 21 49 353 9.6 -9 697.30 -41.2 -41.3 -41.2 72 -99 SPO 1997 04 17 21 50 354 8.8 -9 697.40 -41.2 -41.2 -41.3 72 -99 SPO 1997 04 17 21 51 353 9.4 -9 697.40 -41.2 -41.2 -41.2 70 -99 SPO 1997 04 17 21 52 355 8.6 -9 697.40 -41.1 -41.2 -41.2 69 -99 SPO 1997 04 17 21 53 356 8.9 -9 697.40 -41.1 -41.3 -41.2 70 -99 SPO 1997 04 17 21 54 357 9.1 -9 697.50 -41.1 -41.3 -41.2 70 -99 SPO 1997 04 17 21 55 357 9.3 -9 697.50 -41.1 -41.4 -41.3 70 -99 SPO 1997 04 17 21 56 356 9.5 -9 697.50 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 21 57 357 9.6 -9 697.50 -41.2 -41.4 -41.4 71 -99 SPO 1997 04 17 21 58 355 9.6 -9 697.50 -41.2 -41.4 -41.4 72 -99 SPO 1997 04 17 21 59 354 10.2 -9 697.40 -41.3 -41.4 -41.4 73 -99 SPO 1997 04 17 22 00 353 9.7 -9 697.40 -41.3 -41.4 -41.4 73 0 SPO 1997 04 17 22 01 351 9.6 -9 697.50 -41.3 -41.4 -41.3 73 -99 SPO 1997 04 17 22 02 350 9.8 -9 697.50 -41.3 -41.4 -41.3 72 -99 SPO 1997 04 17 22 03 350 10.0 -9 697.50 -41.3 -41.4 -41.3 72 -99 SPO 1997 04 17 22 04 353 9.6 -9 697.50 -41.3 -41.4 -41.3 71 -99 SPO 1997 04 17 22 05 351 9.3 -9 697.50 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 22 06 353 9.5 -9 697.50 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 22 07 352 9.5 -9 697.50 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 22 08 354 9.9 -9 697.50 -41.2 -41.3 -41.2 72 -99 SPO 1997 04 17 22 09 351 10.1 -9 697.50 -41.2 -41.3 -41.2 72 -99 SPO 1997 04 17 22 10 353 9.4 -9 697.50 -41.2 -41.3 -41.2 73 -99 SPO 1997 04 17 22 11 351 9.2 -9 697.50 -41.2 -41.3 -41.3 74 -99 SPO 1997 04 17 22 12 350 10.1 -9 697.50 -41.2 -41.3 -41.3 74 -99 SPO 1997 04 17 22 13 352 9.8 -9 697.50 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 22 14 351 10.4 -9 697.50 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 15 350 10.9 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 16 351 10.5 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 17 352 10.7 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 18 352 9.9 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 19 353 10.3 -9 697.40 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 22 20 354 10.4 -9 697.50 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 22 21 353 10.8 -9 697.40 -41.2 -41.4 -41.3 70 -99 SPO 1997 04 17 22 22 352 10.4 -9 697.40 -41.3 -41.4 -41.4 71 -99 SPO 1997 04 17 22 23 352 10.8 -9 697.50 -41.3 -41.4 -41.4 72 -99 SPO 1997 04 17 22 24 352 10.9 -9 697.50 -41.3 -41.4 -41.3 73 -99 SPO 1997 04 17 22 25 353 10.4 -9 697.50 -41.3 -41.4 -41.4 73 -99 SPO 1997 04 17 22 26 352 10.6 -9 697.40 -41.3 -41.4 -41.4 73 -99 SPO 1997 04 17 22 27 351 11.6 -9 697.40 -41.3 -41.4 -41.3 73 -99 SPO 1997 04 17 22 28 351 12.0 -9 697.40 -41.3 -41.4 -41.3 73 -99 SPO 1997 04 17 22 29 351 11.6 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 30 353 11.1 -9 697.40 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 31 354 10.7 -9 697.40 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 32 355 10.2 -9 697.40 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 33 353 10.8 -9 697.40 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 22 34 353 10.8 -9 697.40 -41.2 -41.3 -41.3 70 -99 SPO 1997 04 17 22 35 354 10.7 -9 697.50 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 22 36 354 10.5 -9 697.50 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 22 37 354 11.6 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 38 353 10.7 -9 697.50 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 39 353 11.4 -9 697.50 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 40 354 11.5 -9 697.50 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 41 353 10.5 -9 697.50 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 42 354 11.1 -9 697.50 -41.3 -41.4 -41.3 74 -99 SPO 1997 04 17 22 43 352 10.9 -9 697.50 -41.2 -41.4 -41.3 74 -99 SPO 1997 04 17 22 44 353 11.3 -9 697.50 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 45 353 10.8 -9 697.40 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 22 46 351 10.7 -9 697.40 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 22 47 353 11.3 -9 697.50 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 48 352 11.5 -9 697.50 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 49 353 11.1 -9 697.40 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 22 50 352 10.5 -9 697.50 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 22 51 352 11.2 -9 697.50 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 22 52 353 11.6 -9 697.50 -41.2 -41.3 -41.2 73 -99 SPO 1997 04 17 22 53 351 11.4 -9 697.50 -41.2 -41.3 -41.2 74 -99 SPO 1997 04 17 22 54 353 11.1 -9 697.50 -41.2 -41.2 -41.2 74 -99 SPO 1997 04 17 22 55 355 10.7 -9 697.50 -41.2 -41.2 -41.3 74 -99 SPO 1997 04 17 22 56 354 10.6 -9 697.50 -41.2 -41.2 -41.3 73 -99 SPO 1997 04 17 22 57 354 10.8 -9 697.50 -41.2 -41.2 -41.2 72 -99 SPO 1997 04 17 22 58 350 11.0 -9 697.50 -41.1 -41.2 -41.2 70 -99 SPO 1997 04 17 22 59 350 11.5 -9 697.50 -41.1 -41.3 -41.2 70 -99 SPO 1997 04 17 23 00 350 11.4 -9 697.50 -41.1 -41.3 -41.2 70 0 SPO 1997 04 17 23 01 350 11.5 -9 697.50 -41.1 -41.3 -41.2 70 -99 SPO 1997 04 17 23 02 348 11.8 -9 697.50 -41.1 -41.3 -41.2 71 -99 SPO 1997 04 17 23 03 347 11.5 -9 697.50 -41.1 -41.3 -41.2 71 -99 SPO 1997 04 17 23 04 347 11.4 -9 697.50 -41.1 -41.3 -41.2 72 -99 SPO 1997 04 17 23 05 349 10.9 -9 697.50 -41.1 -41.3 -41.2 73 -99 SPO 1997 04 17 23 06 349 11.0 -9 697.60 -41.1 -41.3 -41.2 73 -99 SPO 1997 04 17 23 07 350 11.4 -9 697.60 -41.2 -41.3 -41.2 74 -99 SPO 1997 04 17 23 08 350 11.6 -9 697.60 -41.1 -41.3 -41.2 73 -99 SPO 1997 04 17 23 09 349 11.8 -9 697.60 -41.2 -41.3 -41.2 74 -99 SPO 1997 04 17 23 10 349 11.8 -9 697.60 -41.2 -41.3 -41.2 74 -99 SPO 1997 04 17 23 11 349 11.8 -9 697.60 -41.2 -41.2 -41.2 73 -99 SPO 1997 04 17 23 12 349 12.0 -9 697.60 -41.2 -41.2 -41.2 72 -99 SPO 1997 04 17 23 13 349 12.3 -9 697.60 -41.1 -41.2 -41.2 71 -99 SPO 1997 04 17 23 14 348 12.5 -9 697.60 -41.2 -41.2 -41.2 71 -99 SPO 1997 04 17 23 15 349 11.7 -9 697.60 -41.2 -41.2 -41.2 72 -99 SPO 1997 04 17 23 16 348 11.7 -9 697.60 -41.2 -41.2 -41.2 72 -99 SPO 1997 04 17 23 17 350 11.0 -9 697.70 -41.2 -41.2 -41.2 72 -99 SPO 1997 04 17 23 18 350 10.9 -9 697.70 -41.2 -41.2 -41.3 72 -99 SPO 1997 04 17 23 19 351 10.9 -9 697.70 -41.2 -41.2 -41.3 73 -99 SPO 1997 04 17 23 20 350 11.3 -9 697.70 -41.2 -41.3 -41.3 73 -99 SPO 1997 04 17 23 21 349 11.4 -9 697.80 -41.1 -41.3 -41.2 72 -99 SPO 1997 04 17 23 22 349 11.0 -9 697.80 -41.2 -41.3 -41.3 74 -99 SPO 1997 04 17 23 23 350 10.7 -9 697.90 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 23 24 351 10.1 -9 697.90 -41.2 -41.4 -41.3 73 -99 SPO 1997 04 17 23 25 350 9.8 -9 697.90 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 23 26 350 10.8 -9 697.90 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 23 27 350 11.0 -9 697.90 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 23 28 349 11.4 -9 697.90 -41.2 -41.4 -41.3 71 -99 SPO 1997 04 17 23 29 350 11.0 -9 697.90 -41.2 -41.3 -41.3 72 -99 SPO 1997 04 17 23 30 351 10.6 -9 698.00 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 23 31 351 10.8 -9 698.00 -41.2 -41.4 -41.3 72 -99 SPO 1997 04 17 23 32 348 12.0 -9 698.00 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 23 33 347 11.2 -9 697.90 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 23 34 349 11.8 -9 697.90 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 23 35 349 10.7 -9 698.00 -41.2 -41.3 -41.3 71 -99 SPO 1997 04 17 23 36 351 10.5 -9 698.00 -41.2 -41.3 -41.4 71 -99 SPO 1997 04 17 23 37 351 10.7 -9 698.00 -41.3 -41.3 -41.4 71 -99 SPO 1997 04 17 23 38 349 11.5 -9 698.00 -41.3 -41.3 -41.4 71 -99 SPO 1997 04 17 23 39 350 11.9 -9 698.00 -41.3 -41.3 -41.4 70 -99 SPO 1997 04 17 23 40 350 11.3 -9 698.00 -41.3 -41.4 -41.4 70 -99 SPO 1997 04 17 23 41 351 11.1 -9 698.00 -41.3 -41.4 -41.5 70 -99 SPO 1997 04 17 23 42 352 11.0 -9 698.00 -41.4 -41.4 -41.5 70 -99 SPO 1997 04 17 23 43 352 11.3 -9 698.00 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 17 23 44 352 11.2 -9 698.00 -41.4 -41.6 -41.6 70 -99 SPO 1997 04 17 23 45 353 10.7 -9 698.00 -41.4 -41.6 -41.6 70 -99 SPO 1997 04 17 23 46 353 10.3 -9 698.00 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 23 47 355 10.2 -9 698.10 -41.5 -41.7 -41.6 71 -99 SPO 1997 04 17 23 48 354 10.4 -9 698.10 -41.6 -41.8 -41.8 72 -99 SPO 1997 04 17 23 49 353 11.0 -9 698.10 -41.6 -41.8 -41.8 72 -99 SPO 1997 04 17 23 50 353 10.1 -9 698.10 -41.6 -41.8 -41.8 72 -99 SPO 1997 04 17 23 51 351 11.0 -9 698.10 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 17 23 52 351 11.3 -9 698.20 -41.7 -41.8 -41.7 71 -99 SPO 1997 04 17 23 53 352 10.3 -9 698.20 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 17 23 54 352 10.8 -9 698.20 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 17 23 55 352 10.4 -9 698.20 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 17 23 56 352 10.8 -9 698.20 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 17 23 57 354 11.6 -9 698.20 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 17 23 58 354 10.6 -9 698.20 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 17 23 59 355 10.4 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 00 356 9.6 -9 698.30 -41.7 -41.8 -41.8 -99 0 SPO 1997 04 18 00 01 355 9.8 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 02 352 10.2 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 03 353 10.8 -9 698.30 -41.8 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 04 353 10.8 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 05 352 10.8 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 06 352 10.6 -9 698.30 -41.7 -41.8 -41.8 -99 -99 SPO 1997 04 18 00 07 352 10.3 -9 698.40 -41.7 -41.9 -41.8 -99 -99 SPO 1997 04 18 00 08 355 10.1 -9 698.40 -41.7 -41.9 -41.8 -99 -99 SPO 1997 04 18 00 09 357 10.0 -9 698.40 -41.7 -41.9 -41.8 -99 -99 SPO 1997 04 18 00 10 356 9.7 -9 698.40 -41.7 -41.9 -41.9 -99 -99 SPO 1997 04 18 00 11 354 10.1 -9 698.40 -41.8 -41.9 -41.9 -99 -99 SPO 1997 04 18 00 12 354 10.4 -9 698.40 -41.8 -41.9 -41.8 -99 -99 SPO 1997 04 18 00 13 354 10.3 -9 698.50 -41.8 -41.9 -41.8 73 -99 SPO 1997 04 18 00 14 354 10.1 -9 698.50 -41.8 -41.9 -41.8 73 -99 SPO 1997 04 18 00 15 353 9.7 -9 698.50 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 16 353 10.4 -9 698.50 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 17 355 10.3 -9 698.50 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 18 355 10.4 -9 698.50 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 19 353 10.6 -9 698.50 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 20 352 10.5 -9 698.50 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 21 352 10.7 -9 698.60 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 22 353 10.4 -9 698.60 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 23 356 10.4 -9 698.60 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 24 355 10.4 -9 698.60 -41.7 -41.8 -41.8 73 -99 SPO 1997 04 18 00 25 355 10.0 -9 698.60 -41.7 -41.8 -41.8 73 -99 SPO 1997 04 18 00 26 355 9.8 -9 698.60 -41.7 -41.8 -41.8 73 -99 SPO 1997 04 18 00 27 353 9.9 -9 698.60 -41.7 -41.8 -41.8 73 -99 SPO 1997 04 18 00 28 351 10.1 -9 698.60 -41.7 -41.9 -41.8 73 -99 SPO 1997 04 18 00 29 350 10.4 -9 698.60 -41.7 -41.9 -41.8 73 -99 SPO 1997 04 18 00 30 350 10.8 -9 698.60 -41.7 -41.9 -41.8 72 -99 SPO 1997 04 18 00 31 349 10.9 -9 698.60 -41.7 -41.9 -41.8 72 -99 SPO 1997 04 18 00 32 349 10.6 -9 698.60 -41.7 -41.9 -41.8 71 -99 SPO 1997 04 18 00 33 346 10.3 -9 698.60 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 34 346 10.2 -9 698.60 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 35 348 9.5 -9 698.60 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 00 36 348 10.1 -9 698.60 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 37 348 10.4 -9 698.60 -41.7 -41.8 -41.8 72 -99 SPO 1997 04 18 00 38 348 10.3 -9 698.60 -41.7 -41.7 -41.7 71 -99 SPO 1997 04 18 00 39 347 10.4 -9 698.60 -41.7 -41.7 -41.7 72 -99 SPO 1997 04 18 00 40 347 10.8 -9 698.60 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 18 00 41 346 10.5 -9 698.60 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 18 00 42 349 9.8 -9 698.60 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 18 00 43 352 10.1 -9 698.60 -41.6 -41.7 -41.7 72 -99 SPO 1997 04 18 00 44 351 10.1 -9 698.60 -41.6 -41.6 -41.7 72 -99 SPO 1997 04 18 00 45 349 9.9 -9 698.60 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 18 00 46 351 10.4 -9 698.60 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 18 00 47 351 10.6 -9 698.60 -41.6 -41.6 -41.6 69 -99 SPO 1997 04 18 00 48 350 10.3 -9 698.60 -41.6 -41.6 -41.6 68 -99 SPO 1997 04 18 00 49 349 10.0 -9 698.60 -41.5 -41.6 -41.6 67 -99 SPO 1997 04 18 00 50 349 10.2 -9 698.60 -41.5 -41.7 -41.6 68 -99 SPO 1997 04 18 00 51 349 10.3 -9 698.70 -41.6 -41.7 -41.6 70 -99 SPO 1997 04 18 00 52 351 9.3 -9 698.70 -41.6 -41.7 -41.6 70 -99 SPO 1997 04 18 00 53 352 9.7 -9 698.70 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 54 351 10.3 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 55 351 10.3 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 56 351 10.2 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 57 351 10.2 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 58 353 9.9 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 00 59 351 10.2 -9 698.80 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 18 01 00 351 10.2 -9 698.80 -41.6 -41.7 -41.7 70 0 SPO 1997 04 18 01 01 352 9.9 -9 698.90 -41.6 -41.7 -41.8 70 -99 SPO 1997 04 18 01 02 353 10.2 -9 698.90 -41.6 -41.7 -41.8 70 -99 SPO 1997 04 18 01 03 353 9.7 -9 698.90 -41.7 -41.7 -41.8 71 -99 SPO 1997 04 18 01 04 356 9.4 -9 698.90 -41.7 -41.7 -41.8 72 -99 SPO 1997 04 18 01 05 356 9.6 -9 698.90 -41.7 -41.7 -41.8 72 -99 SPO 1997 04 18 01 06 356 10.3 -9 698.90 -41.7 -41.7 -41.8 71 -99 SPO 1997 04 18 01 07 355 10.5 -9 698.90 -41.7 -41.7 -41.8 71 -99 SPO 1997 04 18 01 08 354 10.6 -9 698.90 -41.7 -41.7 -41.8 71 -99 SPO 1997 04 18 01 09 354 10.0 -9 699.00 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 18 01 10 353 9.7 -9 699.00 -41.7 -41.8 -41.9 70 -99 SPO 1997 04 18 01 11 353 10.1 -9 699.00 -41.7 -41.9 -41.9 70 -99 SPO 1997 04 18 01 12 355 9.3 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 13 356 9.8 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 14 355 9.8 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 15 355 9.6 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 16 355 9.7 -9 699.10 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 17 355 9.4 -9 699.10 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 18 355 9.7 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 19 355 9.5 -9 699.00 -41.8 -41.9 -41.9 70 -99 SPO 1997 04 18 01 20 352 9.6 -9 699.10 -41.8 -41.9 -41.9 71 -99 SPO 1997 04 18 01 21 353 8.9 -9 699.00 -41.8 -41.9 -42.0 71 -99 SPO 1997 04 18 01 22 355 9.1 -9 699.00 -41.9 -41.9 -42.0 72 -99 SPO 1997 04 18 01 23 359 9.3 -9 699.10 -41.9 -41.9 -42.0 71 -99 SPO 1997 04 18 01 24 356 9.5 -9 699.10 -41.9 -42.0 -42.0 71 -99 SPO 1997 04 18 01 25 358 10.0 -9 699.00 -41.9 -42.0 -42.1 70 -99 SPO 1997 04 18 01 26 357 10.6 -9 699.00 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 18 01 27 357 10.5 -9 699.00 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 18 01 28 354 10.4 -9 699.00 -42.0 -42.1 -42.2 69 -99 SPO 1997 04 18 01 29 354 10.2 -9 699.00 -42.0 -42.1 -42.1 67 -99 SPO 1997 04 18 01 30 354 9.4 -9 699.10 -42.0 -42.1 -42.2 67 -99 SPO 1997 04 18 01 31 352 10.5 -9 699.10 -42.1 -42.1 -42.2 67 -99 SPO 1997 04 18 01 32 354 10.0 -9 699.00 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 18 01 33 355 10.0 -9 699.10 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 18 01 34 354 10.2 -9 699.10 -42.1 -42.2 -42.3 70 -99 SPO 1997 04 18 01 35 354 9.3 -9 699.10 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 18 01 36 355 10.3 -9 699.10 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 18 01 37 354 10.8 -9 699.10 -42.2 -42.3 -42.2 70 -99 SPO 1997 04 18 01 38 352 10.2 -9 699.10 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 18 01 39 357 10.0 -9 699.10 -42.2 -42.3 -42.3 69 -99 SPO 1997 04 18 01 40 356 9.8 -9 699.10 -42.2 -42.2 -42.3 69 -99 SPO 1997 04 18 01 41 354 9.5 -9 699.20 -42.2 -42.2 -42.3 69 -99 SPO 1997 04 18 01 42 354 9.9 -9 699.10 -42.2 -42.3 -42.3 69 -99 SPO 1997 04 18 01 43 354 10.4 -9 699.10 -42.3 -42.3 -42.3 71 -99 SPO 1997 04 18 01 44 353 10.7 -9 699.10 -42.3 -42.3 -42.3 71 -99 SPO 1997 04 18 01 45 353 10.7 -9 699.10 -42.2 -42.2 -42.3 70 -99 SPO 1997 04 18 01 46 354 11.0 -9 699.10 -42.3 -42.3 -42.3 71 -99 SPO 1997 04 18 01 47 354 10.3 -9 699.10 -42.3 -42.3 -42.4 71 -99 SPO 1997 04 18 01 48 354 9.9 -9 699.10 -42.3 -42.3 -42.4 71 -99 SPO 1997 04 18 01 49 356 9.6 -9 699.10 -42.3 -42.4 -42.5 71 -99 SPO 1997 04 18 01 50 355 9.9 -9 699.10 -42.3 -42.3 -42.5 70 -99 SPO 1997 04 18 01 51 353 10.1 -9 699.10 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 18 01 52 353 10.4 -9 699.10 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 18 01 53 352 10.3 -9 699.00 -42.4 -42.5 -42.6 69 -99 SPO 1997 04 18 01 54 352 10.9 -9 699.10 -42.5 -42.5 -42.6 70 -99 SPO 1997 04 18 01 55 352 11.2 -9 699.00 -42.5 -42.6 -42.6 70 -99 SPO 1997 04 18 01 56 351 11.5 -9 699.00 -42.5 -42.5 -42.6 70 -99 SPO 1997 04 18 01 57 352 11.1 -9 699.00 -42.5 -42.6 -42.6 69 -99 SPO 1997 04 18 01 58 352 10.5 -9 699.10 -42.5 -42.6 -42.6 70 -99 SPO 1997 04 18 01 59 352 10.4 -9 699.10 -42.5 -42.6 -42.6 70 -99 SPO 1997 04 18 02 00 352 10.2 -9 699.10 -42.5 -42.6 -42.6 69 0 SPO 1997 04 18 02 01 353 10.0 -9 699.10 -42.6 -42.6 -42.7 70 -99 SPO 1997 04 18 02 02 354 10.1 -9 699.10 -42.6 -42.6 -42.7 71 -99 SPO 1997 04 18 02 03 355 10.8 -9 699.10 -42.6 -42.6 -42.7 71 -99 SPO 1997 04 18 02 04 356 10.4 -9 699.10 -42.6 -42.6 -42.7 71 -99 SPO 1997 04 18 02 05 356 10.7 -9 699.10 -42.6 -42.6 -42.7 70 -99 SPO 1997 04 18 02 06 355 10.8 -9 699.10 -42.7 -42.6 -42.8 70 -99 SPO 1997 04 18 02 07 355 10.7 -9 699.20 -42.7 -42.7 -42.8 69 -99 SPO 1997 04 18 02 08 355 10.6 -9 699.10 -42.7 -42.7 -42.8 69 -99 SPO 1997 04 18 02 09 355 10.3 -9 699.20 -42.6 -42.7 -42.8 69 -99 SPO 1997 04 18 02 10 358 9.7 -9 699.30 -42.7 -42.7 -42.9 70 -99 SPO 1997 04 18 02 11 358 9.7 -9 699.30 -42.8 -42.8 -42.9 71 -99 SPO 1997 04 18 02 12 358 9.5 -9 699.30 -42.8 -42.8 -42.9 71 -99 SPO 1997 04 18 02 13 359 9.7 -9 699.30 -42.8 -42.8 -43.0 70 -99 SPO 1997 04 18 02 14 358 9.8 -9 699.30 -42.8 -42.9 -43.0 70 -99 SPO 1997 04 18 02 15 358 9.6 -9 699.30 -42.9 -42.9 -43.0 71 -99 SPO 1997 04 18 02 16 358 9.8 -9 699.30 -42.9 -43.0 -43.0 71 -99 SPO 1997 04 18 02 17 358 9.5 -9 699.30 -42.9 -43.0 -43.0 71 -99 SPO 1997 04 18 02 18 358 10.2 -9 699.30 -42.9 -43.0 -43.0 71 -99 SPO 1997 04 18 02 19 358 10.1 -9 699.30 -42.9 -43.0 -43.0 70 -99 SPO 1997 04 18 02 20 358 9.8 -9 699.30 -43.0 -43.0 -43.1 70 -99 SPO 1997 04 18 02 21 357 10.1 -9 699.30 -43.0 -43.0 -43.1 70 -99 SPO 1997 04 18 02 22 357 9.9 -9 699.30 -43.0 -43.0 -43.1 70 -99 SPO 1997 04 18 02 23 357 9.7 -9 699.30 -43.0 -43.0 -43.1 71 -99 SPO 1997 04 18 02 24 357 10.0 -9 699.40 -43.0 -43.0 -43.1 70 -99 SPO 1997 04 18 02 25 357 9.7 -9 699.40 -43.1 -43.0 -43.1 71 -99 SPO 1997 04 18 02 26 359 9.5 -9 699.40 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 18 02 27 359 9.6 -9 699.40 -43.1 -43.1 -43.2 70 -99 SPO 1997 04 18 02 28 359 9.7 -9 699.40 -43.0 -43.0 -43.2 69 -99 SPO 1997 04 18 02 29 359 9.5 -9 699.40 -43.1 -43.0 -43.2 69 -99 SPO 1997 04 18 02 30 358 9.8 -9 699.40 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 18 02 31 358 10.1 -9 699.40 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 18 02 32 358 10.0 -9 699.40 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 18 02 33 357 9.7 -9 699.40 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 18 02 34 357 9.7 -9 699.50 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 18 02 35 359 9.7 -9 699.50 -43.1 -43.1 -43.2 67 -99 SPO 1997 04 18 02 36 358 9.9 -9 699.50 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 18 02 37 357 9.9 -9 699.50 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 18 02 38 357 9.5 -9 699.50 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 18 02 39 356 9.6 -9 699.50 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 18 02 40 357 9.6 -9 699.50 -43.2 -43.3 -43.4 68 -99 SPO 1997 04 18 02 41 357 9.4 -9 699.50 -43.3 -43.3 -43.4 70 -99 SPO 1997 04 18 02 42 358 9.1 -9 699.50 -43.3 -43.4 -43.4 70 -99 SPO 1997 04 18 02 43 358 9.7 -9 699.50 -43.3 -43.4 -43.5 70 -99 SPO 1997 04 18 02 44 357 9.9 -9 699.50 -43.4 -43.4 -43.5 70 -99 SPO 1997 04 18 02 45 357 10.0 -9 699.60 -43.4 -43.4 -43.4 69 -99 SPO 1997 04 18 02 46 356 9.9 -9 699.60 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 18 02 47 358 9.6 -9 699.60 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 18 02 48 357 9.2 -9 699.60 -43.3 -43.3 -43.5 69 -99 SPO 1997 04 18 02 49 359 9.2 -9 699.60 -43.4 -43.4 -43.5 70 -99 SPO 1997 04 18 02 50 357 9.9 -9 699.60 -43.4 -43.3 -43.5 70 -99 SPO 1997 04 18 02 51 356 9.8 -9 699.60 -43.4 -43.3 -43.5 70 -99 SPO 1997 04 18 02 52 356 9.4 -9 699.60 -43.4 -43.3 -43.5 70 -99 SPO 1997 04 18 02 53 357 9.3 -9 699.60 -43.4 -43.3 -43.5 70 -99 SPO 1997 04 18 02 54 355 9.5 -9 699.60 -43.4 -43.3 -43.4 70 -99 SPO 1997 04 18 02 55 357 9.5 -9 699.60 -43.4 -43.3 -43.5 69 -99 SPO 1997 04 18 02 56 0 9.6 -9 699.70 -43.4 -43.3 -43.5 68 -99 SPO 1997 04 18 02 57 357 9.4 -9 699.70 -43.4 -43.3 -43.5 68 -99 SPO 1997 04 18 02 58 4 9.1 -9 699.70 -43.4 -43.4 -43.5 68 -99 SPO 1997 04 18 02 59 2 9.0 -9 699.70 -43.4 -43.4 -43.6 68 -99 SPO 1997 04 18 03 00 3 8.8 -9 699.70 -43.5 -43.5 -43.6 69 0 SPO 1997 04 18 03 01 1 9.0 -9 699.70 -43.5 -43.5 -43.6 69 -99 SPO 1997 04 18 03 02 2 8.9 -9 699.70 -43.6 -43.6 -43.7 70 -99 SPO 1997 04 18 03 03 4 9.2 -9 699.70 -43.6 -43.6 -43.7 70 -99 SPO 1997 04 18 03 04 360 8.9 -9 699.70 -43.6 -43.6 -43.7 70 -99 SPO 1997 04 18 03 05 0 9.2 -9 699.70 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 18 03 06 360 9.0 -9 699.70 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 18 03 07 357 8.9 -9 699.70 -43.6 -43.6 -43.7 68 -99 SPO 1997 04 18 03 08 358 9.2 -9 699.70 -43.6 -43.5 -43.7 69 -99 SPO 1997 04 18 03 09 357 9.2 -9 699.70 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 18 03 10 359 9.3 -9 699.70 -43.6 -43.6 -43.7 68 -99 SPO 1997 04 18 03 11 358 9.0 -9 699.70 -43.6 -43.6 -43.7 68 -99 SPO 1997 04 18 03 12 2 9.5 -9 699.70 -43.6 -43.6 -43.8 68 -99 SPO 1997 04 18 03 13 1 8.9 -9 699.70 -43.6 -43.5 -43.7 68 -99 SPO 1997 04 18 03 14 2 8.8 -9 699.70 -43.7 -43.6 -43.8 70 -99 SPO 1997 04 18 03 15 1 8.6 -9 699.80 -43.7 -43.7 -43.9 69 -99 SPO 1997 04 18 03 16 1 8.5 -9 699.80 -43.7 -43.7 -43.9 69 -99 SPO 1997 04 18 03 17 2 8.7 -9 699.80 -43.7 -43.7 -43.8 69 -99 SPO 1997 04 18 03 18 2 9.1 -9 699.80 -43.7 -43.7 -43.8 69 -99 SPO 1997 04 18 03 19 1 8.9 -9 699.80 -43.8 -43.7 -43.8 70 -99 SPO 1997 04 18 03 20 1 8.7 -9 699.80 -43.8 -43.8 -43.9 70 -99 SPO 1997 04 18 03 21 2 8.7 -9 699.80 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 18 03 22 3 8.8 -9 699.90 -43.8 -43.8 -43.9 71 -99 SPO 1997 04 18 03 23 3 8.4 -9 699.80 -43.8 -43.9 -44.0 69 -99 SPO 1997 04 18 03 24 5 8.2 -9 699.80 -43.9 -43.9 -44.0 69 -99 SPO 1997 04 18 03 25 5 7.8 -9 699.90 -43.9 -44.0 -44.0 68 -99 SPO 1997 04 18 03 26 7 7.7 -9 699.90 -44.0 -44.0 -44.0 69 -99 SPO 1997 04 18 03 27 8 8.0 -9 699.90 -43.9 -44.0 -44.1 68 -99 SPO 1997 04 18 03 28 7 8.4 -9 699.90 -44.0 -44.0 -44.2 69 -99 SPO 1997 04 18 03 29 7 8.7 -9 699.90 -44.0 -44.1 -44.2 68 -99 SPO 1997 04 18 03 30 6 8.3 -9 699.90 -44.1 -44.1 -44.2 69 -99 SPO 1997 04 18 03 31 6 8.6 -9 699.90 -44.1 -44.1 -44.2 69 -99 SPO 1997 04 18 03 32 6 8.3 -9 699.90 -44.1 -44.1 -44.2 69 -99 SPO 1997 04 18 03 33 5 8.6 -9 699.90 -44.1 -44.2 -44.3 69 -99 SPO 1997 04 18 03 34 5 8.4 -9 699.90 -44.2 -44.2 -44.3 70 -99 SPO 1997 04 18 03 35 4 8.4 -9 699.90 -44.2 -44.2 -44.3 69 -99 SPO 1997 04 18 03 36 4 8.3 -9 699.90 -44.2 -44.2 -44.3 68 -99 SPO 1997 04 18 03 37 4 8.0 -9 699.90 -44.2 -44.2 -44.3 67 -99 SPO 1997 04 18 03 38 3 8.2 -9 699.90 -44.2 -44.3 -44.3 67 -99 SPO 1997 04 18 03 39 4 8.2 -9 699.90 -44.2 -44.3 -44.4 68 -99 SPO 1997 04 18 03 40 4 8.7 -9 699.90 -44.2 -44.3 -44.3 68 -99 SPO 1997 04 18 03 41 5 8.7 -9 699.90 -44.3 -44.3 -44.3 69 -99 SPO 1997 04 18 03 42 6 8.5 -9 700.00 -44.3 -44.4 -44.4 69 -99 SPO 1997 04 18 03 43 6 8.8 -9 700.00 -44.3 -44.4 -44.4 67 -99 SPO 1997 04 18 03 44 8 8.2 -9 700.00 -44.3 -44.4 -44.4 67 -99 SPO 1997 04 18 03 45 9 8.0 -9 700.00 -44.4 -44.4 -44.4 67 -99 SPO 1997 04 18 03 46 6 8.6 -9 700.00 -44.3 -44.4 -44.4 67 -99 SPO 1997 04 18 03 47 7 8.5 -9 700.00 -44.3 -44.4 -44.4 67 -99 SPO 1997 04 18 03 48 5 8.6 -9 700.00 -44.4 -44.4 -44.5 67 -99 SPO 1997 04 18 03 49 5 8.6 -9 700.00 -44.4 -44.4 -44.5 66 -99 SPO 1997 04 18 03 50 4 8.3 -9 700.00 -44.4 -44.4 -44.5 66 -99 SPO 1997 04 18 03 51 6 8.8 -9 700.00 -44.4 -44.4 -44.5 66 -99 SPO 1997 04 18 03 52 3 8.6 -9 700.00 -44.4 -44.4 -44.5 67 -99 SPO 1997 04 18 03 53 4 8.3 -9 700.00 -44.4 -44.4 -44.5 67 -99 SPO 1997 04 18 03 54 5 8.4 -9 700.00 -44.4 -44.4 -44.5 68 -99 SPO 1997 04 18 03 55 3 8.8 -9 700.00 -44.4 -44.4 -44.5 68 -99 SPO 1997 04 18 03 56 3 8.5 -9 700.00 -44.4 -44.4 -44.5 68 -99 SPO 1997 04 18 03 57 4 8.6 -9 700.00 -44.4 -44.4 -44.5 67 -99 SPO 1997 04 18 03 58 3 8.4 -9 700.00 -44.4 -44.4 -44.5 67 -99 SPO 1997 04 18 03 59 3 8.8 -9 700.00 -44.4 -44.5 -44.5 67 -99 SPO 1997 04 18 04 00 3 8.4 -9 700.00 -44.4 -44.5 -44.5 67 0 SPO 1997 04 18 04 01 3 8.6 -9 700.00 -44.4 -44.5 -44.6 67 -99 SPO 1997 04 18 04 02 4 8.4 -9 700.00 -44.5 -44.5 -44.6 67 -99 SPO 1997 04 18 04 03 5 8.1 -9 700.10 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 18 04 04 7 8.2 -9 700.10 -44.5 -44.6 -44.6 66 -99 SPO 1997 04 18 04 05 5 8.1 -9 700.10 -44.6 -44.6 -44.6 67 -99 SPO 1997 04 18 04 06 7 8.1 -9 700.10 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 18 04 07 7 7.7 -9 700.10 -44.6 -44.6 -44.7 67 -99 SPO 1997 04 18 04 08 7 8.0 -9 700.10 -44.6 -44.6 -44.7 67 -99 SPO 1997 04 18 04 09 6 7.9 -9 700.10 -44.6 -44.7 -44.7 67 -99 SPO 1997 04 18 04 10 7 7.7 -9 700.20 -44.6 -44.7 -44.7 67 -99 SPO 1997 04 18 04 11 6 7.6 -9 700.20 -44.6 -44.7 -44.7 67 -99 SPO 1997 04 18 04 12 8 7.3 -9 700.20 -44.7 -44.7 -44.8 68 -99 SPO 1997 04 18 04 13 7 7.5 -9 700.20 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 18 04 14 7 7.5 -9 700.20 -44.7 -44.6 -44.7 67 -99 SPO 1997 04 18 04 15 8 7.4 -9 700.20 -44.6 -44.6 -44.7 66 -99 SPO 1997 04 18 04 16 8 7.9 -9 700.20 -44.6 -44.6 -44.7 66 -99 SPO 1997 04 18 04 17 7 7.8 -9 700.20 -44.6 -44.6 -44.7 66 -99 SPO 1997 04 18 04 18 7 7.9 -9 700.20 -44.6 -44.6 -44.7 66 -99 SPO 1997 04 18 04 19 6 7.7 -9 700.20 -44.6 -44.6 -44.8 66 -99 SPO 1997 04 18 04 20 6 8.0 -9 700.20 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 18 04 21 7 7.7 -9 700.30 -44.7 -44.8 -44.8 67 -99 SPO 1997 04 18 04 22 7 7.8 -9 700.30 -44.7 -44.8 -44.8 67 -99 SPO 1997 04 18 04 23 8 7.7 -9 700.30 -44.7 -44.8 -44.8 66 -99 SPO 1997 04 18 04 24 8 7.9 -9 700.30 -44.7 -44.7 -44.8 66 -99 SPO 1997 04 18 04 25 6 7.9 -9 700.30 -44.7 -44.7 -44.8 66 -99 SPO 1997 04 18 04 26 6 8.1 -9 700.30 -44.7 -44.7 -44.8 66 -99 SPO 1997 04 18 04 27 5 8.2 -9 700.40 -44.7 -44.6 -44.8 66 -99 SPO 1997 04 18 04 28 5 7.6 -9 700.40 -44.6 -44.5 -44.6 65 -99 SPO 1997 04 18 04 29 7 7.2 -9 700.40 -44.6 -44.6 -44.7 66 -99 SPO 1997 04 18 04 30 7 7.2 -9 700.40 -44.7 -44.6 -44.8 66 -99 SPO 1997 04 18 04 31 7 7.2 -9 700.40 -44.7 -44.7 -44.9 67 -99 SPO 1997 04 18 04 32 9 7.5 -9 700.40 -44.8 -44.7 -44.9 67 -99 SPO 1997 04 18 04 33 9 7.1 -9 700.40 -44.8 -44.7 -44.9 67 -99 SPO 1997 04 18 04 34 10 7.3 -9 700.40 -44.8 -44.7 -44.9 67 -99 SPO 1997 04 18 04 35 10 7.3 -9 700.40 -44.8 -44.7 -44.9 67 -99 SPO 1997 04 18 04 36 11 7.3 -9 700.40 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 18 04 37 11 7.5 -9 700.40 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 18 04 38 11 7.5 -9 700.40 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 18 04 39 11 7.5 -9 700.40 -44.8 -44.6 -44.9 65 -99 SPO 1997 04 18 04 40 10 7.8 -9 700.40 -44.8 -44.6 -44.9 65 -99 SPO 1997 04 18 04 41 9 7.8 -9 700.40 -44.8 -44.6 -44.9 65 -99 SPO 1997 04 18 04 42 9 7.9 -9 700.40 -44.8 -44.6 -44.9 66 -99 SPO 1997 04 18 04 43 8 8.2 -9 700.40 -44.8 -44.6 -44.8 67 -99 SPO 1997 04 18 04 44 7 8.2 -9 700.40 -44.7 -44.6 -44.8 66 -99 SPO 1997 04 18 04 45 6 8.0 -9 700.40 -44.7 -44.6 -44.8 67 -99 SPO 1997 04 18 04 46 6 8.0 -9 700.40 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 18 04 47 2 8.5 -9 700.40 -44.8 -44.4 -44.8 67 -99 SPO 1997 04 18 04 48 5 8.5 -9 700.40 -44.7 -44.4 -44.6 67 -99 SPO 1997 04 18 04 49 6 7.9 -9 700.50 -44.6 -44.5 -44.8 67 -99 SPO 1997 04 18 04 50 7 7.6 -9 700.50 -44.7 -44.6 -44.9 68 -99 SPO 1997 04 18 04 51 10 7.7 -9 700.50 -44.8 -44.6 -45.0 68 -99 SPO 1997 04 18 04 52 11 7.8 -9 700.50 -44.8 -44.6 -45.0 67 -99 SPO 1997 04 18 04 53 11 7.5 -9 700.60 -44.9 -44.6 -45.0 67 -99 SPO 1997 04 18 04 54 12 7.8 -9 700.60 -44.9 -44.6 -45.1 66 -99 SPO 1997 04 18 04 55 13 7.7 -9 700.60 -44.9 -44.6 -45.0 64 -99 SPO 1997 04 18 04 56 12 7.8 -9 700.60 -45.0 -44.6 -45.1 66 -99 SPO 1997 04 18 04 57 12 7.9 -9 700.60 -45.0 -44.6 -45.1 66 -99 SPO 1997 04 18 04 58 11 8.1 -9 700.60 -45.0 -44.6 -45.0 66 -99 SPO 1997 04 18 04 59 10 7.9 -9 700.60 -45.0 -44.6 -45.0 66 -99 SPO 1997 04 18 05 00 9 8.2 -9 700.60 -45.0 -44.6 -45.0 67 0 SPO 1997 04 18 05 01 7 8.3 -9 700.60 -45.0 -44.6 -45.0 67 -99 SPO 1997 04 18 05 02 5 8.4 -9 700.60 -44.9 -44.6 -45.0 67 -99 SPO 1997 04 18 05 03 7 8.0 -9 700.50 -44.9 -44.6 -44.9 67 -99 SPO 1997 04 18 05 04 7 8.2 -9 700.50 -44.9 -44.6 -45.0 67 -99 SPO 1997 04 18 05 05 5 8.2 -9 700.50 -44.9 -44.6 -45.0 66 -99 SPO 1997 04 18 05 06 6 8.3 -9 700.50 -44.9 -44.6 -45.0 66 -99 SPO 1997 04 18 05 07 5 8.2 -9 700.50 -44.9 -44.6 -45.0 65 -99 SPO 1997 04 18 05 08 6 8.3 -9 700.50 -44.9 -44.6 -45.0 65 -99 SPO 1997 04 18 05 09 5 8.5 -9 700.50 -44.9 -44.7 -45.0 66 -99 SPO 1997 04 18 05 10 5 8.7 -9 700.50 -44.9 -44.6 -45.0 66 -99 SPO 1997 04 18 05 11 5 8.8 -9 700.50 -45.0 -44.7 -45.0 67 -99 SPO 1997 04 18 05 12 5 8.9 -9 700.50 -44.9 -44.7 -45.0 67 -99 SPO 1997 04 18 05 13 4 8.7 -9 700.40 -45.0 -44.7 -45.1 68 -99 SPO 1997 04 18 05 14 3 8.8 -9 700.40 -45.0 -44.7 -45.0 67 -99 SPO 1997 04 18 05 15 3 8.8 -9 700.50 -45.0 -44.6 -45.1 67 -99 SPO 1997 04 18 05 16 4 8.6 -9 700.40 -45.0 -44.6 -45.1 67 -99 SPO 1997 04 18 05 17 2 8.4 -9 700.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 18 05 18 1 8.5 -9 700.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 18 05 19 1 8.4 -9 700.50 -45.1 -44.6 -45.1 66 -99 SPO 1997 04 18 05 20 0 8.3 -9 700.50 -45.0 -44.7 -45.1 65 -99 SPO 1997 04 18 05 21 3 8.5 -9 700.50 -45.1 -44.8 -45.1 66 -99 SPO 1997 04 18 05 22 3 8.6 -9 700.50 -45.0 -44.8 -45.1 66 -99 SPO 1997 04 18 05 23 5 8.2 -9 700.50 -45.0 -44.9 -45.2 67 -99 SPO 1997 04 18 05 24 6 8.2 -9 700.50 -45.1 -44.9 -45.2 67 -99 SPO 1997 04 18 05 25 6 7.9 -9 700.50 -45.1 -45.0 -45.3 67 -99 SPO 1997 04 18 05 26 7 8.1 -9 700.60 -45.2 -44.9 -45.3 68 -99 SPO 1997 04 18 05 27 8 8.1 -9 700.60 -45.2 -45.0 -45.4 68 -99 SPO 1997 04 18 05 28 6 7.8 -9 700.60 -45.3 -45.0 -45.4 69 -99 SPO 1997 04 18 05 29 5 7.7 -9 700.60 -45.3 -45.0 -45.4 69 -99 SPO 1997 04 18 05 30 5 8.1 -9 700.60 -45.3 -45.0 -45.4 67 -99 SPO 1997 04 18 05 31 6 8.2 -9 700.60 -45.3 -45.0 -45.4 67 -99 SPO 1997 04 18 05 32 5 8.1 -9 700.60 -45.3 -45.0 -45.4 66 -99 SPO 1997 04 18 05 33 5 8.5 -9 700.60 -45.3 -44.9 -45.4 66 -99 SPO 1997 04 18 05 34 5 8.4 -9 700.60 -45.3 -44.9 -45.4 67 -99 SPO 1997 04 18 05 35 4 8.9 -9 700.60 -45.3 -44.9 -45.3 67 -99 SPO 1997 04 18 05 36 4 8.7 -9 700.60 -45.3 -44.9 -45.3 68 -99 SPO 1997 04 18 05 37 3 8.5 -9 700.60 -45.3 -44.9 -45.4 68 -99 SPO 1997 04 18 05 38 3 8.4 -9 700.60 -45.3 -44.9 -45.4 68 -99 SPO 1997 04 18 05 39 3 8.6 -9 700.60 -45.3 -44.9 -45.4 67 -99 SPO 1997 04 18 05 40 3 8.5 -9 700.60 -45.3 -45.0 -45.4 67 -99 SPO 1997 04 18 05 41 3 8.5 -9 700.60 -45.4 -45.0 -45.4 68 -99 SPO 1997 04 18 05 42 2 8.5 -9 700.60 -45.4 -45.1 -45.5 68 -99 SPO 1997 04 18 05 43 1 8.4 -9 700.60 -45.4 -45.1 -45.6 67 -99 SPO 1997 04 18 05 44 1 8.5 -9 700.60 -45.4 -45.1 -45.5 66 -99 SPO 1997 04 18 05 45 1 8.8 -9 700.50 -45.5 -45.1 -45.6 67 -99 SPO 1997 04 18 05 46 0 8.8 -9 700.50 -45.5 -45.1 -45.6 67 -99 SPO 1997 04 18 05 47 359 8.5 -9 700.50 -45.5 -45.1 -45.6 67 -99 SPO 1997 04 18 05 48 359 8.6 -9 700.50 -45.5 -45.1 -45.6 68 -99 SPO 1997 04 18 05 49 359 8.8 -9 700.50 -45.5 -45.1 -45.6 68 -99 SPO 1997 04 18 05 50 2 8.7 -9 700.50 -45.5 -45.1 -45.6 68 -99 SPO 1997 04 18 05 51 3 8.6 -9 700.50 -45.6 -45.1 -45.7 69 -99 SPO 1997 04 18 05 52 4 8.3 -9 700.60 -45.6 -45.2 -45.7 68 -99 SPO 1997 04 18 05 53 5 8.3 -9 700.60 -45.6 -45.2 -45.8 67 -99 SPO 1997 04 18 05 54 5 8.3 -9 700.60 -45.6 -45.2 -45.8 67 -99 SPO 1997 04 18 05 55 6 8.2 -9 700.60 -45.7 -45.2 -45.8 67 -99 SPO 1997 04 18 05 56 7 8.1 -9 700.70 -45.6 -45.1 -45.8 66 -99 SPO 1997 04 18 05 57 7 8.0 -9 700.70 -45.7 -45.2 -45.8 66 -99 SPO 1997 04 18 05 58 8 7.9 -9 700.70 -45.7 -45.2 -45.8 66 -99 SPO 1997 04 18 05 59 8 7.8 -9 700.70 -45.7 -45.2 -45.8 66 -99 SPO 1997 04 18 06 00 7 7.8 -9 700.70 -45.7 -45.3 -45.8 66 0 SPO 1997 04 18 06 01 7 7.9 -9 700.70 -45.8 -45.3 -45.8 66 -99 SPO 1997 04 18 06 02 7 7.7 -9 700.70 -45.8 -45.3 -45.9 66 -99 SPO 1997 04 18 06 03 7 7.6 -9 700.70 -45.8 -45.4 -45.9 66 -99 SPO 1997 04 18 06 04 8 7.6 -9 700.70 -45.8 -45.4 -45.9 66 -99 SPO 1997 04 18 06 05 9 7.8 -9 700.70 -45.8 -45.4 -45.9 66 -99 SPO 1997 04 18 06 06 8 7.9 -9 700.70 -45.8 -45.4 -45.9 66 -99 SPO 1997 04 18 06 07 7 7.9 -9 700.70 -45.9 -45.4 -45.9 67 -99 SPO 1997 04 18 06 08 6 8.4 -9 700.70 -45.8 -45.3 -45.8 66 -99 SPO 1997 04 18 06 09 6 8.1 -9 700.70 -45.8 -45.4 -45.8 66 -99 SPO 1997 04 18 06 10 6 8.0 -9 700.70 -45.8 -45.4 -46.0 66 -99 SPO 1997 04 18 06 11 5 8.1 -9 700.70 -45.9 -45.5 -46.0 66 -99 SPO 1997 04 18 06 12 5 8.1 -9 700.60 -45.9 -45.5 -46.1 66 -99 SPO 1997 04 18 06 13 5 8.3 -9 700.60 -46.0 -45.5 -46.1 67 -99 SPO 1997 04 18 06 14 5 8.3 -9 700.60 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 06 15 5 8.4 -9 700.60 -46.0 -45.5 -46.2 66 -99 SPO 1997 04 18 06 16 5 8.7 -9 700.60 -46.0 -45.5 -46.2 66 -99 SPO 1997 04 18 06 17 4 8.6 -9 700.60 -46.1 -45.5 -46.2 67 -99 SPO 1997 04 18 06 18 4 8.4 -9 700.60 -46.1 -45.5 -46.2 66 -99 SPO 1997 04 18 06 19 2 8.5 -9 700.60 -46.1 -45.5 -46.2 65 -99 SPO 1997 04 18 06 20 1 8.4 -9 700.60 -46.1 -45.5 -46.2 64 -99 SPO 1997 04 18 06 21 360 8.5 -9 700.60 -46.1 -45.4 -46.2 64 -99 SPO 1997 04 18 06 22 359 8.4 -9 700.60 -46.1 -45.4 -46.2 63 -99 SPO 1997 04 18 06 23 360 8.4 -9 700.60 -46.1 -45.4 -46.1 63 -99 SPO 1997 04 18 06 24 360 8.9 -9 700.60 -46.1 -45.4 -46.0 64 -99 SPO 1997 04 18 06 25 1 8.9 -9 700.60 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 18 06 26 2 8.7 -9 700.70 -46.0 -45.4 -46.1 66 -99 SPO 1997 04 18 06 27 3 8.8 -9 700.70 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 18 06 28 3 8.3 -9 700.70 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 18 06 29 3 8.2 -9 700.70 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 06 30 5 8.0 -9 700.70 -46.0 -45.5 -46.2 66 -99 SPO 1997 04 18 06 31 5 8.1 -9 700.70 -46.1 -45.5 -46.3 66 -99 SPO 1997 04 18 06 32 6 7.8 -9 700.70 -46.2 -45.6 -46.3 66 -99 SPO 1997 04 18 06 33 6 7.5 -9 700.70 -46.2 -45.7 -46.4 65 -99 SPO 1997 04 18 06 34 7 7.9 -9 700.70 -46.3 -45.6 -46.4 65 -99 SPO 1997 04 18 06 35 6 8.1 -9 700.70 -46.3 -45.5 -46.4 64 -99 SPO 1997 04 18 06 36 6 8.1 -9 700.70 -46.3 -45.5 -46.3 65 -99 SPO 1997 04 18 06 37 3 8.0 -9 700.80 -46.2 -45.6 -46.3 65 -99 SPO 1997 04 18 06 38 5 7.8 -9 700.80 -46.3 -45.5 -46.3 65 -99 SPO 1997 04 18 06 39 8 8.3 -9 700.80 -46.3 -45.4 -46.2 67 -99 SPO 1997 04 18 06 40 9 7.8 -9 700.80 -46.2 -45.6 -46.3 66 -99 SPO 1997 04 18 06 41 10 7.7 -9 700.80 -46.2 -45.6 -46.3 67 -99 SPO 1997 04 18 06 42 10 7.4 -9 700.80 -46.3 -45.8 -46.4 67 -99 SPO 1997 04 18 06 43 10 8.1 -9 700.80 -46.3 -45.7 -46.4 67 -99 SPO 1997 04 18 06 44 10 8.0 -9 700.80 -46.3 -45.6 -46.4 65 -99 SPO 1997 04 18 06 45 7 8.2 -9 700.80 -46.3 -45.6 -46.2 65 -99 SPO 1997 04 18 06 46 7 8.0 -9 700.80 -46.3 -45.7 -46.4 65 -99 SPO 1997 04 18 06 47 6 8.2 -9 700.80 -46.3 -45.6 -46.3 65 -99 SPO 1997 04 18 06 48 5 8.1 -9 700.80 -46.3 -45.5 -46.3 65 -99 SPO 1997 04 18 06 49 4 7.8 -9 700.80 -46.3 -45.5 -46.4 65 -99 SPO 1997 04 18 06 50 5 7.7 -9 700.80 -46.3 -45.5 -46.4 65 -99 SPO 1997 04 18 06 51 5 8.1 -9 700.90 -46.3 -45.5 -46.4 65 -99 SPO 1997 04 18 06 52 4 8.1 -9 700.90 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 06 53 3 8.0 -9 700.90 -46.3 -45.5 -46.3 68 -99 SPO 1997 04 18 06 54 3 7.6 -9 700.90 -46.3 -45.5 -46.3 68 -99 SPO 1997 04 18 06 55 3 7.7 -9 700.90 -46.3 -45.5 -46.4 68 -99 SPO 1997 04 18 06 56 3 7.7 -9 700.90 -46.3 -45.5 -46.4 68 -99 SPO 1997 04 18 06 57 3 7.7 -9 700.90 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 06 58 3 7.8 -9 700.90 -46.3 -45.6 -46.4 65 -99 SPO 1997 04 18 06 59 1 7.6 -9 700.90 -46.3 -45.6 -46.4 65 -99 SPO 1997 04 18 07 00 2 7.5 -9 700.90 -46.4 -45.7 -46.5 65 0 SPO 1997 04 18 07 01 2 7.2 -9 701.00 -46.4 -45.6 -46.5 65 -99 SPO 1997 04 18 07 02 5 7.6 -9 701.00 -46.4 -45.4 -46.4 65 -99 SPO 1997 04 18 07 03 6 7.2 -9 701.00 -46.4 -45.6 -46.4 68 -99 SPO 1997 04 18 07 04 7 7.2 -9 701.00 -46.4 -45.7 -46.4 68 -99 SPO 1997 04 18 07 05 7 7.0 -9 701.10 -46.4 -45.7 -46.5 68 -99 SPO 1997 04 18 07 06 10 6.7 -9 701.10 -46.4 -45.7 -46.5 68 -99 SPO 1997 04 18 07 07 11 6.7 -9 701.10 -46.4 -45.8 -46.5 68 -99 SPO 1997 04 18 07 08 10 6.5 -9 701.10 -46.4 -45.7 -46.5 66 -99 SPO 1997 04 18 07 09 11 6.5 -9 701.10 -46.4 -45.7 -46.6 66 -99 SPO 1997 04 18 07 10 11 6.6 -9 701.10 -46.4 -45.8 -46.5 65 -99 SPO 1997 04 18 07 11 12 6.6 -9 701.10 -46.4 -45.8 -46.5 65 -99 SPO 1997 04 18 07 12 12 6.8 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 07 13 12 6.7 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 07 14 14 7.0 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 07 15 12 6.9 -9 701.10 -46.4 -45.7 -46.5 66 -99 SPO 1997 04 18 07 16 11 6.7 -9 701.10 -46.4 -45.7 -46.5 66 -99 SPO 1997 04 18 07 17 10 6.9 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 07 18 9 6.8 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 07 19 8 6.9 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 07 20 9 6.8 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 07 21 11 7.0 -9 701.10 -46.4 -45.7 -46.4 68 -99 SPO 1997 04 18 07 22 13 7.3 -9 701.10 -46.4 -45.7 -46.4 68 -99 SPO 1997 04 18 07 23 14 7.3 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 07 24 15 7.2 -9 701.10 -46.4 -45.6 -46.4 68 -99 SPO 1997 04 18 07 25 15 7.3 -9 701.10 -46.4 -45.6 -46.4 68 -99 SPO 1997 04 18 07 26 15 7.3 -9 701.10 -46.4 -45.6 -46.5 66 -99 SPO 1997 04 18 07 27 14 7.1 -9 701.10 -46.4 -45.6 -46.5 66 -99 SPO 1997 04 18 07 28 12 7.2 -9 701.10 -46.4 -45.5 -46.5 66 -99 SPO 1997 04 18 07 29 12 7.3 -9 701.10 -46.4 -45.5 -46.5 66 -99 SPO 1997 04 18 07 30 10 7.2 -9 701.10 -46.4 -45.4 -46.5 68 -99 SPO 1997 04 18 07 31 10 7.3 -9 701.10 -46.4 -45.4 -46.5 68 -99 SPO 1997 04 18 07 32 11 7.6 -9 701.10 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 07 33 10 7.8 -9 701.10 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 07 34 9 8.0 -9 701.10 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 07 35 8 8.0 -9 701.00 -46.4 -45.4 -46.4 66 -99 SPO 1997 04 18 07 36 7 8.1 -9 701.00 -46.4 -45.4 -46.4 66 -99 SPO 1997 04 18 07 37 5 8.1 -9 701.00 -46.4 -45.4 -46.4 65 -99 SPO 1997 04 18 07 38 4 8.4 -9 701.00 -46.4 -45.5 -46.4 65 -99 SPO 1997 04 18 07 39 3 8.6 -9 701.00 -46.4 -45.5 -46.4 66 -99 SPO 1997 04 18 07 40 3 9.1 -9 700.90 -46.3 -45.3 -46.4 65 -99 SPO 1997 04 18 07 41 2 8.8 -9 700.90 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 07 42 2 9.1 -9 700.90 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 07 43 2 8.9 -9 700.90 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 07 44 1 9.3 -9 700.90 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 07 45 1 9.3 -9 700.90 -46.3 -45.4 -46.3 67 -99 SPO 1997 04 18 07 46 1 9.2 -9 700.90 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 07 47 2 9.1 -9 700.90 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 07 48 3 9.1 -9 700.90 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 07 49 4 9.2 -9 700.90 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 07 50 4 9.0 -9 700.90 -46.4 -45.4 -46.4 65 -99 SPO 1997 04 18 07 51 3 8.9 -9 700.90 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 07 52 2 8.8 -9 700.90 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 07 53 3 8.9 -9 700.90 -46.3 -45.3 -46.4 67 -99 SPO 1997 04 18 07 54 2 8.8 -9 701.00 -46.3 -45.3 -46.4 67 -99 SPO 1997 04 18 07 55 2 8.9 -9 701.00 -46.3 -45.3 -46.4 67 -99 SPO 1997 04 18 07 56 2 8.8 -9 701.00 -46.3 -45.3 -46.3 67 -99 SPO 1997 04 18 07 57 2 8.7 -9 701.00 -46.3 -45.3 -46.4 67 -99 SPO 1997 04 18 07 58 2 8.7 -9 701.00 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 07 59 1 8.7 -9 701.00 -46.3 -45.4 -46.4 68 -99 SPO 1997 04 18 08 00 1 8.6 -9 701.00 -46.3 -45.4 -46.4 67 0 SPO 1997 04 18 08 01 1 9.1 -9 701.00 -46.3 -45.4 -46.3 67 -99 SPO 1997 04 18 08 02 1 8.9 -9 701.00 -46.3 -45.3 -46.3 67 -99 SPO 1997 04 18 08 03 360 8.8 -9 701.00 -46.2 -45.2 -46.3 66 -99 SPO 1997 04 18 08 04 0 8.9 -9 701.00 -46.2 -45.3 -46.3 67 -99 SPO 1997 04 18 08 05 0 9.1 -9 701.00 -46.2 -45.3 -46.2 68 -99 SPO 1997 04 18 08 06 0 8.9 -9 701.00 -46.2 -45.2 -46.2 68 -99 SPO 1997 04 18 08 07 0 8.9 -9 701.00 -46.2 -45.2 -46.2 68 -99 SPO 1997 04 18 08 08 0 8.8 -9 701.00 -46.2 -45.2 -46.2 68 -99 SPO 1997 04 18 08 09 1 8.8 -9 701.00 -46.2 -45.1 -46.2 68 -99 SPO 1997 04 18 08 10 1 8.7 -9 701.00 -46.2 -45.2 -46.2 68 -99 SPO 1997 04 18 08 11 1 8.5 -9 701.00 -46.1 -45.2 -46.2 68 -99 SPO 1997 04 18 08 12 2 8.4 -9 701.00 -46.1 -45.1 -46.2 67 -99 SPO 1997 04 18 08 13 2 8.6 -9 701.00 -46.1 -45.2 -46.2 66 -99 SPO 1997 04 18 08 14 3 8.6 -9 701.00 -46.2 -45.2 -46.2 66 -99 SPO 1997 04 18 08 15 4 8.6 -9 700.90 -46.2 -45.2 -46.2 65 -99 SPO 1997 04 18 08 16 4 8.6 -9 700.90 -46.2 -45.2 -46.2 65 -99 SPO 1997 04 18 08 17 3 8.5 -9 701.00 -46.1 -45.3 -46.2 65 -99 SPO 1997 04 18 08 18 3 8.3 -9 701.00 -46.2 -45.4 -46.3 66 -99 SPO 1997 04 18 08 19 4 8.2 -9 701.00 -46.2 -45.4 -46.3 67 -99 SPO 1997 04 18 08 20 4 8.3 -9 701.00 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 21 4 8.4 -9 701.00 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 22 3 8.2 -9 701.00 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 23 3 8.2 -9 701.00 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 24 4 8.0 -9 701.10 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 25 5 8.2 -9 701.10 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 08 26 6 8.0 -9 701.10 -46.2 -45.4 -46.3 66 -99 SPO 1997 04 18 08 27 7 8.1 -9 701.10 -46.2 -45.4 -46.3 65 -99 SPO 1997 04 18 08 28 7 8.1 -9 701.10 -46.2 -45.4 -46.3 65 -99 SPO 1997 04 18 08 29 8 8.1 -9 701.10 -46.2 -45.4 -46.3 65 -99 SPO 1997 04 18 08 30 9 8.1 -9 701.10 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 08 31 8 7.9 -9 701.10 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 08 32 8 7.9 -9 701.10 -46.3 -45.5 -46.5 67 -99 SPO 1997 04 18 08 33 8 7.8 -9 701.10 -46.4 -45.6 -46.5 68 -99 SPO 1997 04 18 08 34 7 7.5 -9 701.10 -46.4 -45.6 -46.6 68 -99 SPO 1997 04 18 08 35 8 7.7 -9 701.10 -46.4 -45.7 -46.6 65 -99 SPO 1997 04 18 08 36 8 7.7 -9 701.10 -46.5 -45.8 -46.7 65 -99 SPO 1997 04 18 08 37 8 7.9 -9 701.10 -46.6 -45.9 -46.7 65 -99 SPO 1997 04 18 08 38 6 7.8 -9 701.10 -46.6 -46.0 -46.8 65 -99 SPO 1997 04 18 08 39 5 8.2 -9 701.10 -46.6 -46.0 -46.7 65 -99 SPO 1997 04 18 08 40 5 8.1 -9 701.10 -46.6 -46.0 -46.7 65 -99 SPO 1997 04 18 08 41 5 8.5 -9 701.10 -46.6 -46.0 -46.6 65 -99 SPO 1997 04 18 08 42 4 8.6 -9 701.10 -46.6 -46.0 -46.6 66 -99 SPO 1997 04 18 08 43 4 8.8 -9 701.10 -46.6 -45.9 -46.6 66 -99 SPO 1997 04 18 08 44 3 8.8 -9 701.10 -46.5 -45.9 -46.5 66 -99 SPO 1997 04 18 08 45 3 8.9 -9 701.10 -46.4 -45.8 -46.4 66 -99 SPO 1997 04 18 08 46 3 8.7 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 08 47 3 8.6 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 08 48 2 8.5 -9 701.10 -46.3 -45.7 -46.4 67 -99 SPO 1997 04 18 08 49 2 8.2 -9 701.10 -46.3 -45.7 -46.4 67 -99 SPO 1997 04 18 08 50 2 8.3 -9 701.10 -46.4 -45.7 -46.4 66 -99 SPO 1997 04 18 08 51 2 8.1 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 08 52 3 8.5 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 08 53 3 8.0 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 08 54 4 8.1 -9 701.10 -46.4 -45.7 -46.5 65 -99 SPO 1997 04 18 08 55 5 8.1 -9 701.10 -46.4 -45.8 -46.5 66 -99 SPO 1997 04 18 08 56 4 8.2 -9 701.10 -46.4 -45.8 -46.6 68 -99 SPO 1997 04 18 08 57 4 8.3 -9 701.00 -46.4 -45.8 -46.6 68 -99 SPO 1997 04 18 08 58 4 8.3 -9 701.00 -46.5 -45.7 -46.6 69 -99 SPO 1997 04 18 08 59 4 8.6 -9 701.00 -46.5 -45.6 -46.6 68 -99 SPO 1997 04 18 09 00 4 8.6 -9 700.90 -46.5 -45.6 -46.7 68 0 SPO 1997 04 18 09 01 4 8.6 -9 700.90 -46.6 -45.5 -46.7 69 -99 SPO 1997 04 18 09 02 3 8.9 -9 700.90 -46.6 -45.5 -46.7 67 -99 SPO 1997 04 18 09 03 3 8.8 -9 700.90 -46.6 -45.5 -46.7 66 -99 SPO 1997 04 18 09 04 3 8.7 -9 700.90 -46.6 -45.4 -46.7 66 -99 SPO 1997 04 18 09 05 2 8.8 -9 700.90 -46.6 -45.4 -46.7 65 -99 SPO 1997 04 18 09 06 2 8.8 -9 700.90 -46.6 -45.4 -46.7 66 -99 SPO 1997 04 18 09 07 1 9.0 -9 700.90 -46.6 -45.3 -46.7 67 -99 SPO 1997 04 18 09 08 1 8.9 -9 700.90 -46.6 -45.3 -46.7 68 -99 SPO 1997 04 18 09 09 0 9.0 -9 700.90 -46.6 -45.3 -46.6 68 -99 SPO 1997 04 18 09 10 359 8.8 -9 700.90 -46.6 -45.3 -46.6 69 -99 SPO 1997 04 18 09 11 359 9.1 -9 700.90 -46.6 -45.4 -46.6 69 -99 SPO 1997 04 18 09 12 360 8.8 -9 701.00 -46.5 -45.4 -46.6 68 -99 SPO 1997 04 18 09 13 360 8.8 -9 701.00 -46.5 -45.4 -46.6 68 -99 SPO 1997 04 18 09 14 360 8.6 -9 701.00 -46.5 -45.4 -46.5 67 -99 SPO 1997 04 18 09 15 0 8.6 -9 701.00 -46.4 -45.5 -46.5 66 -99 SPO 1997 04 18 09 16 360 8.4 -9 701.00 -46.4 -45.5 -46.5 66 -99 SPO 1997 04 18 09 17 360 8.4 -9 701.00 -46.4 -45.5 -46.4 66 -99 SPO 1997 04 18 09 18 1 8.6 -9 701.10 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 09 19 2 8.3 -9 701.10 -46.4 -45.4 -46.4 68 -99 SPO 1997 04 18 09 20 2 8.6 -9 701.00 -46.3 -45.4 -46.4 68 -99 SPO 1997 04 18 09 21 2 8.4 -9 701.10 -46.3 -45.4 -46.3 68 -99 SPO 1997 04 18 09 22 2 8.5 -9 701.10 -46.3 -45.4 -46.2 68 -99 SPO 1997 04 18 09 23 2 8.6 -9 701.10 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 09 24 2 8.4 -9 701.10 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 09 25 3 8.3 -9 701.10 -46.2 -45.4 -46.3 69 -99 SPO 1997 04 18 09 26 4 8.7 -9 701.10 -46.2 -45.4 -46.3 69 -99 SPO 1997 04 18 09 27 5 8.6 -9 701.10 -46.2 -45.4 -46.3 68 -99 SPO 1997 04 18 09 28 5 8.6 -9 701.10 -46.2 -45.4 -46.3 68 -99 SPO 1997 04 18 09 29 4 8.4 -9 701.10 -46.2 -45.4 -46.3 67 -99 SPO 1997 04 18 09 30 4 8.6 -9 701.10 -46.2 -45.4 -46.3 67 -99 SPO 1997 04 18 09 31 4 8.3 -9 701.10 -46.2 -45.4 -46.4 67 -99 SPO 1997 04 18 09 32 4 8.2 -9 701.10 -46.3 -45.5 -46.4 68 -99 SPO 1997 04 18 09 33 3 8.5 -9 701.10 -46.3 -45.4 -46.4 67 -99 SPO 1997 04 18 09 34 3 8.6 -9 701.10 -46.3 -45.5 -46.4 68 -99 SPO 1997 04 18 09 35 3 8.8 -9 701.10 -46.3 -45.5 -46.4 68 -99 SPO 1997 04 18 09 36 2 8.5 -9 701.10 -46.2 -45.6 -46.3 68 -99 SPO 1997 04 18 09 37 3 8.4 -9 701.10 -46.3 -45.6 -46.4 69 -99 SPO 1997 04 18 09 38 2 8.3 -9 701.10 -46.3 -45.6 -46.4 68 -99 SPO 1997 04 18 09 39 1 8.4 -9 701.10 -46.3 -45.6 -46.4 68 -99 SPO 1997 04 18 09 40 1 8.9 -9 701.10 -46.3 -45.6 -46.3 68 -99 SPO 1997 04 18 09 41 1 8.8 -9 701.10 -46.3 -45.6 -46.3 68 -99 SPO 1997 04 18 09 42 2 8.7 -9 701.10 -46.2 -45.6 -46.2 66 -99 SPO 1997 04 18 09 43 2 8.9 -9 701.10 -46.2 -45.6 -46.2 66 -99 SPO 1997 04 18 09 44 1 8.8 -9 701.10 -46.2 -45.6 -46.2 66 -99 SPO 1997 04 18 09 45 0 9.0 -9 701.10 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 18 09 46 360 8.8 -9 701.10 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 18 09 47 359 8.7 -9 701.10 -46.1 -45.4 -46.2 68 -99 SPO 1997 04 18 09 48 359 8.3 -9 701.10 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 09 49 358 8.3 -9 701.10 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 09 50 359 8.2 -9 701.10 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 09 51 359 8.0 -9 701.20 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 09 52 0 7.8 -9 701.20 -46.1 -45.5 -46.2 68 -99 SPO 1997 04 18 09 53 1 8.2 -9 701.20 -46.1 -45.5 -46.2 67 -99 SPO 1997 04 18 09 54 1 8.1 -9 701.20 -46.1 -45.6 -46.2 65 -99 SPO 1997 04 18 09 55 1 7.9 -9 701.20 -46.1 -45.6 -46.2 65 -99 SPO 1997 04 18 09 56 0 8.1 -9 701.20 -46.1 -45.7 -46.1 66 -99 SPO 1997 04 18 09 57 360 8.1 -9 701.20 -46.1 -45.6 -46.1 67 -99 SPO 1997 04 18 09 58 359 8.0 -9 701.20 -46.1 -45.6 -46.2 69 -99 SPO 1997 04 18 09 59 359 8.3 -9 701.20 -46.1 -45.6 -46.1 69 -99 SPO 1997 04 18 10 00 359 8.1 -9 701.20 -46.1 -45.6 -46.1 69 0 SPO 1997 04 18 10 01 359 8.2 -9 701.20 -46.0 -45.6 -46.1 68 -99 SPO 1997 04 18 10 02 357 8.1 -9 701.20 -46.0 -45.5 -46.1 69 -99 SPO 1997 04 18 10 03 356 8.2 -9 701.20 -46.0 -45.5 -46.1 69 -99 SPO 1997 04 18 10 04 356 8.1 -9 701.20 -46.0 -45.5 -46.1 69 -99 SPO 1997 04 18 10 05 357 8.3 -9 701.20 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 06 357 8.6 -9 701.20 -46.0 -45.4 -46.0 67 -99 SPO 1997 04 18 10 07 358 8.3 -9 701.20 -46.0 -45.4 -46.0 67 -99 SPO 1997 04 18 10 08 358 8.0 -9 701.20 -46.0 -45.5 -46.2 67 -99 SPO 1997 04 18 10 09 359 8.2 -9 701.20 -46.0 -45.5 -46.2 67 -99 SPO 1997 04 18 10 10 359 8.3 -9 701.20 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 18 10 11 358 7.8 -9 701.20 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 10 12 359 8.0 -9 701.30 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 10 13 360 8.0 -9 701.30 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 14 360 8.1 -9 701.30 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 15 1 8.1 -9 701.30 -46.0 -45.5 -46.1 69 -99 SPO 1997 04 18 10 16 1 8.1 -9 701.30 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 17 1 8.2 -9 701.30 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 18 3 8.3 -9 701.30 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 10 19 2 8.0 -9 701.40 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 10 20 2 7.8 -9 701.40 -46.0 -45.6 -46.1 66 -99 SPO 1997 04 18 10 21 1 8.0 -9 701.40 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 10 22 1 7.7 -9 701.40 -46.1 -45.5 -46.1 67 -99 SPO 1997 04 18 10 23 360 7.8 -9 701.40 -46.0 -45.5 -46.1 67 -99 SPO 1997 04 18 10 24 360 7.7 -9 701.40 -46.0 -45.5 -46.1 68 -99 SPO 1997 04 18 10 25 358 7.7 -9 701.30 -46.0 -45.4 -46.0 68 -99 SPO 1997 04 18 10 26 358 7.8 -9 701.30 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 10 27 358 7.8 -9 701.30 -46.0 -45.4 -46.0 69 -99 SPO 1997 04 18 10 28 357 7.9 -9 701.40 -45.9 -45.4 -46.0 68 -99 SPO 1997 04 18 10 29 358 7.7 -9 701.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 10 30 359 7.6 -9 701.40 -46.0 -45.4 -46.1 67 -99 SPO 1997 04 18 10 31 359 7.6 -9 701.40 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 18 10 32 0 7.6 -9 701.40 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 10 33 1 7.6 -9 701.40 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 10 34 1 7.6 -9 701.40 -46.0 -45.4 -46.1 66 -99 SPO 1997 04 18 10 35 1 7.6 -9 701.40 -46.0 -45.3 -46.0 68 -99 SPO 1997 04 18 10 36 1 7.5 -9 701.40 -46.0 -45.3 -46.0 68 -99 SPO 1997 04 18 10 37 1 7.8 -9 701.40 -46.0 -45.2 -46.0 68 -99 SPO 1997 04 18 10 38 0 7.8 -9 701.40 -45.9 -45.2 -46.0 68 -99 SPO 1997 04 18 10 39 1 7.7 -9 701.40 -45.9 -45.2 -45.9 69 -99 SPO 1997 04 18 10 40 0 8.0 -9 701.30 -45.9 -45.2 -45.9 69 -99 SPO 1997 04 18 10 41 1 7.9 -9 701.30 -45.9 -45.2 -45.9 69 -99 SPO 1997 04 18 10 42 1 7.8 -9 701.30 -45.9 -45.1 -46.0 69 -99 SPO 1997 04 18 10 43 1 7.8 -9 701.30 -45.9 -45.1 -45.9 68 -99 SPO 1997 04 18 10 44 0 7.7 -9 701.30 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 18 10 45 360 7.5 -9 701.30 -45.9 -45.0 -46.0 67 -99 SPO 1997 04 18 10 46 1 7.4 -9 701.30 -45.9 -45.0 -46.0 67 -99 SPO 1997 04 18 10 47 3 7.2 -9 701.30 -45.9 -45.0 -46.0 67 -99 SPO 1997 04 18 10 48 4 7.1 -9 701.30 -45.9 -45.0 -46.0 67 -99 SPO 1997 04 18 10 49 6 7.0 -9 701.40 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 18 10 50 6 7.1 -9 701.40 -46.0 -45.0 -46.1 69 -99 SPO 1997 04 18 10 51 7 6.8 -9 701.40 -46.0 -45.0 -46.1 68 -99 SPO 1997 04 18 10 52 7 6.8 -9 701.40 -46.0 -45.1 -46.1 68 -99 SPO 1997 04 18 10 53 6 6.8 -9 701.40 -46.0 -45.1 -46.2 67 -99 SPO 1997 04 18 10 54 6 6.8 -9 701.40 -46.1 -45.1 -46.2 68 -99 SPO 1997 04 18 10 55 7 7.1 -9 701.40 -46.1 -45.1 -46.2 68 -99 SPO 1997 04 18 10 56 7 7.4 -9 701.40 -46.1 -45.1 -46.1 68 -99 SPO 1997 04 18 10 57 8 7.3 -9 701.30 -46.0 -45.1 -46.0 66 -99 SPO 1997 04 18 10 58 9 7.5 -9 701.30 -46.0 -45.1 -46.0 67 -99 SPO 1997 04 18 10 59 9 7.5 -9 701.30 -46.0 -45.1 -46.0 68 -99 SPO 1997 04 18 11 00 9 7.5 -9 701.30 -46.0 -45.1 -46.0 68 0 SPO 1997 04 18 11 01 10 7.8 -9 701.30 -46.0 -45.1 -46.0 69 -99 SPO 1997 04 18 11 02 10 7.9 -9 701.30 -45.9 -45.1 -45.9 68 -99 SPO 1997 04 18 11 03 11 7.8 -9 701.40 -45.9 -45.1 -45.9 68 -99 SPO 1997 04 18 11 04 11 7.8 -9 701.40 -45.9 -45.0 -45.9 69 -99 SPO 1997 04 18 11 05 12 7.7 -9 701.30 -45.9 -45.0 -46.0 69 -99 SPO 1997 04 18 11 06 12 7.8 -9 701.30 -45.9 -45.0 -46.0 69 -99 SPO 1997 04 18 11 07 12 7.8 -9 701.40 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 18 11 08 12 7.7 -9 701.40 -45.9 -44.9 -46.0 67 -99 SPO 1997 04 18 11 09 12 7.6 -9 701.40 -45.9 -44.9 -46.0 67 -99 SPO 1997 04 18 11 10 12 7.6 -9 701.40 -45.9 -45.0 -46.0 66 -99 SPO 1997 04 18 11 11 11 7.3 -9 701.40 -45.9 -45.0 -46.0 66 -99 SPO 1997 04 18 11 12 10 7.5 -9 701.40 -45.9 -45.2 -46.0 67 -99 SPO 1997 04 18 11 13 9 7.4 -9 701.40 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 18 11 14 9 7.7 -9 701.40 -45.9 -45.2 -46.0 67 -99 SPO 1997 04 18 11 15 9 7.8 -9 701.40 -45.9 -45.2 -46.0 67 -99 SPO 1997 04 18 11 16 9 7.7 -9 701.40 -45.9 -45.2 -46.0 68 -99 SPO 1997 04 18 11 17 9 7.7 -9 701.40 -45.9 -45.2 -46.0 68 -99 SPO 1997 04 18 11 18 10 7.7 -9 701.40 -45.9 -45.2 -45.9 68 -99 SPO 1997 04 18 11 19 11 7.6 -9 701.40 -45.9 -45.2 -45.9 68 -99 SPO 1997 04 18 11 20 12 7.5 -9 701.40 -45.9 -45.2 -46.0 67 -99 SPO 1997 04 18 11 21 12 7.3 -9 701.40 -45.9 -45.2 -46.0 66 -99 SPO 1997 04 18 11 22 12 7.2 -9 701.40 -45.9 -45.2 -46.0 66 -99 SPO 1997 04 18 11 23 13 7.0 -9 701.50 -45.9 -45.3 -46.0 66 -99 SPO 1997 04 18 11 24 14 6.9 -9 701.50 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 18 11 25 14 6.9 -9 701.50 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 11 26 13 7.1 -9 701.50 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 18 11 27 11 7.0 -9 701.40 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 18 11 28 11 6.9 -9 701.40 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 18 11 29 10 7.0 -9 701.40 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 18 11 30 10 7.0 -9 701.40 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 18 11 31 10 7.3 -9 701.40 -46.1 -45.3 -46.1 68 -99 SPO 1997 04 18 11 32 11 7.2 -9 701.40 -46.1 -45.3 -46.1 68 -99 SPO 1997 04 18 11 33 10 7.1 -9 701.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 11 34 11 7.1 -9 701.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 11 35 12 7.0 -9 701.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 11 36 13 7.0 -9 701.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 11 37 13 6.9 -9 701.50 -46.0 -45.4 -46.1 66 -99 SPO 1997 04 18 11 38 12 6.9 -9 701.50 -46.0 -45.5 -46.1 66 -99 SPO 1997 04 18 11 39 10 6.8 -9 701.40 -46.1 -45.5 -46.2 68 -99 SPO 1997 04 18 11 40 9 6.8 -9 701.40 -46.1 -45.5 -46.2 69 -99 SPO 1997 04 18 11 41 9 7.2 -9 701.40 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 11 42 8 7.2 -9 701.40 -46.1 -45.4 -46.1 69 -99 SPO 1997 04 18 11 43 8 7.5 -9 701.30 -46.1 -45.3 -46.1 68 -99 SPO 1997 04 18 11 44 8 7.7 -9 701.30 -46.1 -45.3 -46.1 68 -99 SPO 1997 04 18 11 45 8 7.9 -9 701.30 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 18 11 46 8 7.7 -9 701.30 -46.1 -45.3 -46.1 67 -99 SPO 1997 04 18 11 47 7 7.7 -9 701.30 -46.1 -45.3 -46.2 66 -99 SPO 1997 04 18 11 48 7 7.7 -9 701.30 -46.1 -45.3 -46.1 65 -99 SPO 1997 04 18 11 49 7 7.4 -9 701.30 -46.1 -45.3 -46.2 65 -99 SPO 1997 04 18 11 50 7 7.6 -9 701.30 -46.1 -45.3 -46.1 66 -99 SPO 1997 04 18 11 51 8 7.7 -9 701.30 -46.1 -45.4 -46.2 67 -99 SPO 1997 04 18 11 52 8 7.5 -9 701.40 -46.1 -45.4 -46.2 68 -99 SPO 1997 04 18 11 53 8 7.6 -9 701.40 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 11 54 8 7.3 -9 701.40 -46.1 -45.4 -46.2 69 -99 SPO 1997 04 18 11 55 10 7.5 -9 701.40 -46.1 -45.4 -46.2 68 -99 SPO 1997 04 18 11 56 11 7.3 -9 701.40 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 11 57 11 7.4 -9 701.40 -46.2 -45.4 -46.2 68 -99 SPO 1997 04 18 11 58 12 7.3 -9 701.40 -46.2 -45.4 -46.2 67 -99 SPO 1997 04 18 11 59 11 7.2 -9 701.50 -46.2 -45.4 -46.3 66 -99 SPO 1997 04 18 12 00 11 7.0 -9 701.50 -46.2 -45.4 -46.3 65 0 SPO 1997 04 18 12 01 12 7.0 -9 701.50 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 12 02 13 6.8 -9 701.50 -46.3 -45.4 -46.4 65 -99 SPO 1997 04 18 12 03 14 6.8 -9 701.50 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 12 04 13 6.7 -9 701.50 -46.3 -45.5 -46.4 67 -99 SPO 1997 04 18 12 05 14 6.7 -9 701.50 -46.4 -45.4 -46.5 68 -99 SPO 1997 04 18 12 06 14 6.4 -9 701.50 -46.4 -45.4 -46.5 68 -99 SPO 1997 04 18 12 07 14 6.5 -9 701.50 -46.4 -45.4 -46.6 68 -99 SPO 1997 04 18 12 08 13 6.5 -9 701.50 -46.5 -45.5 -46.6 68 -99 SPO 1997 04 18 12 09 13 6.6 -9 701.50 -46.5 -45.4 -46.6 67 -99 SPO 1997 04 18 12 10 13 6.8 -9 701.50 -46.5 -45.3 -46.6 66 -99 SPO 1997 04 18 12 11 13 6.8 -9 701.50 -46.5 -45.3 -46.5 66 -99 SPO 1997 04 18 12 12 13 6.8 -9 701.50 -46.5 -45.2 -46.5 65 -99 SPO 1997 04 18 12 13 14 6.9 -9 701.50 -46.4 -45.2 -46.5 65 -99 SPO 1997 04 18 12 14 14 7.0 -9 701.50 -46.4 -45.2 -46.5 65 -99 SPO 1997 04 18 12 15 12 6.8 -9 701.50 -46.4 -45.2 -46.4 66 -99 SPO 1997 04 18 12 16 12 6.9 -9 701.50 -46.4 -45.1 -46.4 66 -99 SPO 1997 04 18 12 17 12 6.9 -9 701.50 -46.4 -45.1 -46.5 66 -99 SPO 1997 04 18 12 18 13 6.7 -9 701.50 -46.4 -45.1 -46.5 66 -99 SPO 1997 04 18 12 19 12 6.8 -9 701.50 -46.4 -45.2 -46.5 68 -99 SPO 1997 04 18 12 20 12 6.8 -9 701.50 -46.5 -45.2 -46.5 67 -99 SPO 1997 04 18 12 21 13 6.9 -9 701.50 -46.5 -45.3 -46.6 67 -99 SPO 1997 04 18 12 22 14 6.9 -9 701.50 -46.5 -45.3 -46.5 67 -99 SPO 1997 04 18 12 23 13 6.9 -9 701.40 -46.5 -45.2 -46.6 66 -99 SPO 1997 04 18 12 24 12 7.0 -9 701.40 -46.5 -45.1 -46.6 65 -99 SPO 1997 04 18 12 25 12 7.0 -9 701.40 -46.5 -45.0 -46.5 65 -99 SPO 1997 04 18 12 26 12 7.0 -9 701.30 -46.5 -44.9 -46.6 65 -99 SPO 1997 04 18 12 27 13 7.2 -9 701.30 -46.5 -44.8 -46.7 65 -99 SPO 1997 04 18 12 28 12 7.3 -9 701.30 -46.6 -44.8 -46.7 65 -99 SPO 1997 04 18 12 29 12 7.3 -9 701.30 -46.6 -44.8 -46.7 65 -99 SPO 1997 04 18 12 30 13 7.5 -9 701.30 -46.6 -44.8 -46.7 65 -99 SPO 1997 04 18 12 31 14 7.6 -9 701.30 -46.7 -45.0 -46.7 67 -99 SPO 1997 04 18 12 32 13 7.6 -9 701.30 -46.7 -45.1 -46.7 67 -99 SPO 1997 04 18 12 33 13 7.7 -9 701.30 -46.7 -45.0 -46.7 66 -99 SPO 1997 04 18 12 34 14 7.6 -9 701.30 -46.7 -45.0 -46.7 66 -99 SPO 1997 04 18 12 35 14 7.7 -9 701.30 -46.7 -45.0 -46.8 66 -99 SPO 1997 04 18 12 36 14 7.5 -9 701.30 -46.7 -44.9 -46.7 65 -99 SPO 1997 04 18 12 37 14 7.5 -9 701.30 -46.7 -44.9 -46.8 65 -99 SPO 1997 04 18 12 38 16 7.5 -9 701.30 -46.7 -44.9 -46.8 65 -99 SPO 1997 04 18 12 39 18 7.5 -9 701.30 -46.8 -45.0 -46.8 65 -99 SPO 1997 04 18 12 40 19 7.4 -9 701.30 -46.8 -45.1 -46.8 66 -99 SPO 1997 04 18 12 41 20 7.4 -9 701.30 -46.8 -45.1 -46.8 66 -99 SPO 1997 04 18 12 42 21 7.2 -9 701.30 -46.8 -45.2 -46.9 66 -99 SPO 1997 04 18 12 43 22 7.0 -9 701.30 -46.8 -45.2 -46.9 66 -99 SPO 1997 04 18 12 44 23 7.0 -9 701.40 -46.9 -45.3 -46.9 67 -99 SPO 1997 04 18 12 45 22 7.0 -9 701.40 -46.8 -45.4 -46.9 66 -99 SPO 1997 04 18 12 46 22 7.0 -9 701.30 -46.9 -45.3 -47.0 68 -99 SPO 1997 04 18 12 47 22 7.1 -9 701.30 -46.9 -45.3 -47.0 68 -99 SPO 1997 04 18 12 48 22 6.9 -9 701.30 -46.9 -45.3 -47.0 66 -99 SPO 1997 04 18 12 49 22 7.0 -9 701.30 -46.9 -45.4 -47.0 65 -99 SPO 1997 04 18 12 50 22 6.9 -9 701.30 -46.9 -45.4 -46.9 65 -99 SPO 1997 04 18 12 51 23 6.9 -9 701.40 -46.9 -45.4 -46.9 65 -99 SPO 1997 04 18 12 52 24 6.8 -9 701.40 -46.9 -45.4 -47.0 65 -99 SPO 1997 04 18 12 53 26 6.7 -9 701.40 -46.9 -45.6 -47.0 66 -99 SPO 1997 04 18 12 54 28 6.5 -9 701.40 -47.0 -45.7 -47.0 67 -99 SPO 1997 04 18 12 55 31 6.4 -9 701.40 -47.0 -45.8 -47.1 67 -99 SPO 1997 04 18 12 56 33 6.3 -9 701.50 -47.1 -46.0 -47.2 68 -99 SPO 1997 04 18 12 57 33 6.2 -9 701.50 -47.1 -46.1 -47.2 67 -99 SPO 1997 04 18 12 58 34 6.3 -9 701.50 -47.2 -46.1 -47.2 67 -99 SPO 1997 04 18 12 59 33 6.5 -9 701.50 -47.2 -46.1 -47.2 67 -99 SPO 1997 04 18 13 00 33 6.5 -9 701.50 -47.2 -46.1 -47.2 66 0 SPO 1997 04 18 13 01 31 6.8 -9 701.40 -47.2 -46.0 -47.2 65 -99 SPO 1997 04 18 13 02 30 6.6 -9 701.40 -47.2 -46.0 -47.2 65 -99 SPO 1997 04 18 13 03 31 6.7 -9 701.40 -47.2 -46.0 -47.2 65 -99 SPO 1997 04 18 13 04 32 6.8 -9 701.50 -47.2 -45.9 -47.2 65 -99 SPO 1997 04 18 13 05 34 6.8 -9 701.50 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 18 13 06 38 6.9 -9 701.50 -47.2 -45.9 -47.3 65 -99 SPO 1997 04 18 13 07 40 6.9 -9 701.50 -47.2 -45.9 -47.4 65 -99 SPO 1997 04 18 13 08 43 6.7 -9 701.50 -47.3 -46.0 -47.4 66 -99 SPO 1997 04 18 13 09 45 6.7 -9 701.60 -47.3 -46.1 -47.4 66 -99 SPO 1997 04 18 13 10 45 6.6 -9 701.60 -47.4 -46.2 -47.5 67 -99 SPO 1997 04 18 13 11 46 6.2 -9 701.60 -47.4 -46.2 -47.5 67 -99 SPO 1997 04 18 13 12 45 6.0 -9 701.60 -47.4 -46.5 -47.6 67 -99 SPO 1997 04 18 13 13 43 5.8 -9 701.60 -47.5 -46.6 -47.6 66 -99 SPO 1997 04 18 13 14 42 5.4 -9 701.60 -47.6 -46.8 -47.7 66 -99 SPO 1997 04 18 13 15 42 5.6 -9 701.60 -47.7 -46.8 -47.8 66 -99 SPO 1997 04 18 13 16 41 5.8 -9 701.50 -47.7 -46.8 -47.8 66 -99 SPO 1997 04 18 13 17 40 6.0 -9 701.60 -47.8 -46.7 -47.8 67 -99 SPO 1997 04 18 13 18 41 6.6 -9 701.60 -47.7 -46.7 -47.7 66 -99 SPO 1997 04 18 13 19 43 6.7 -9 701.60 -47.7 -46.8 -47.8 66 -99 SPO 1997 04 18 13 20 43 6.7 -9 701.60 -47.8 -46.8 -47.8 67 -99 SPO 1997 04 18 13 21 42 6.4 -9 701.60 -47.8 -46.8 -47.9 66 -99 SPO 1997 04 18 13 22 41 6.5 -9 701.50 -47.8 -46.9 -48.0 66 -99 SPO 1997 04 18 13 23 40 6.3 -9 701.60 -47.9 -46.9 -48.0 66 -99 SPO 1997 04 18 13 24 39 6.4 -9 701.50 -47.9 -46.8 -48.0 66 -99 SPO 1997 04 18 13 25 38 6.3 -9 701.50 -47.9 -46.8 -48.0 65 -99 SPO 1997 04 18 13 26 37 6.4 -9 701.50 -47.9 -46.7 -47.9 64 -99 SPO 1997 04 18 13 27 36 6.3 -9 701.50 -47.9 -46.7 -47.9 62 -99 SPO 1997 04 18 13 28 35 6.3 -9 701.50 -47.9 -46.6 -47.9 63 -99 SPO 1997 04 18 13 29 36 6.3 -9 701.50 -47.9 -46.6 -47.8 64 -99 SPO 1997 04 18 13 30 37 6.1 -9 701.50 -47.8 -46.6 -47.8 64 -99 SPO 1997 04 18 13 31 36 6.2 -9 701.50 -47.8 -46.6 -47.8 64 -99 SPO 1997 04 18 13 32 35 6.2 -9 701.50 -47.7 -46.5 -47.7 64 -99 SPO 1997 04 18 13 33 35 6.4 -9 701.50 -47.7 -46.4 -47.6 64 -99 SPO 1997 04 18 13 34 35 6.2 -9 701.50 -47.6 -46.4 -47.6 64 -99 SPO 1997 04 18 13 35 37 6.3 -9 701.50 -47.6 -46.4 -47.7 64 -99 SPO 1997 04 18 13 36 37 6.0 -9 701.50 -47.7 -46.4 -47.8 64 -99 SPO 1997 04 18 13 37 37 5.9 -9 701.50 -47.7 -46.4 -47.8 64 -99 SPO 1997 04 18 13 38 36 5.7 -9 701.50 -47.7 -46.3 -47.8 64 -99 SPO 1997 04 18 13 39 34 5.9 -9 701.50 -47.8 -46.2 -47.8 64 -99 SPO 1997 04 18 13 40 31 6.0 -9 701.50 -47.7 -46.2 -47.7 63 -99 SPO 1997 04 18 13 41 31 6.0 -9 701.50 -47.6 -46.2 -47.5 62 -99 SPO 1997 04 18 13 42 29 5.8 -9 701.50 -47.6 -46.2 -47.6 64 -99 SPO 1997 04 18 13 43 28 5.6 -9 701.40 -47.6 -46.3 -47.6 64 -99 SPO 1997 04 18 13 44 26 5.7 -9 701.40 -47.6 -46.3 -47.7 65 -99 SPO 1997 04 18 13 45 25 5.8 -9 701.40 -47.6 -46.2 -47.8 64 -99 SPO 1997 04 18 13 46 22 6.0 -9 701.40 -47.7 -46.2 -47.8 64 -99 SPO 1997 04 18 13 47 20 6.1 -9 701.40 -47.7 -46.1 -47.7 64 -99 SPO 1997 04 18 13 48 18 6.1 -9 701.30 -47.7 -46.0 -47.7 64 -99 SPO 1997 04 18 13 49 17 6.2 -9 701.30 -47.6 -45.9 -47.7 64 -99 SPO 1997 04 18 13 50 17 6.5 -9 701.30 -47.6 -45.9 -47.6 64 -99 SPO 1997 04 18 13 51 15 6.5 -9 701.30 -47.6 -45.9 -47.6 64 -99 SPO 1997 04 18 13 52 14 6.7 -9 701.20 -47.5 -45.8 -47.6 62 -99 SPO 1997 04 18 13 53 14 6.8 -9 701.20 -47.6 -45.7 -47.6 63 -99 SPO 1997 04 18 13 54 12 7.0 -9 701.20 -47.6 -45.5 -47.7 63 -99 SPO 1997 04 18 13 55 12 7.0 -9 701.20 -47.6 -45.4 -47.6 64 -99 SPO 1997 04 18 13 56 10 7.0 -9 701.10 -47.6 -45.1 -47.6 65 -99 SPO 1997 04 18 13 57 9 7.2 -9 701.10 -47.6 -44.9 -47.6 66 -99 SPO 1997 04 18 13 58 8 7.3 -9 701.10 -47.5 -44.6 -47.5 65 -99 SPO 1997 04 18 13 59 8 7.4 -9 701.00 -47.5 -44.4 -47.5 65 -99 SPO 1997 04 18 14 00 8 7.3 -9 701.00 -47.5 -44.1 -47.5 66 0 SPO 1997 04 18 14 01 8 7.4 -9 701.00 -47.5 -44.0 -47.6 66 -99 SPO 1997 04 18 14 02 8 7.5 -9 701.00 -47.5 -43.9 -47.5 66 -99 SPO 1997 04 18 14 03 9 7.5 -9 701.00 -47.5 -44.0 -47.5 64 -99 SPO 1997 04 18 14 04 9 7.3 -9 701.00 -47.5 -44.0 -47.5 64 -99 SPO 1997 04 18 14 05 9 7.4 -9 701.00 -47.5 -44.1 -47.5 64 -99 SPO 1997 04 18 14 06 9 7.4 -9 701.00 -47.5 -44.1 -47.5 64 -99 SPO 1997 04 18 14 07 9 7.3 -9 700.90 -47.4 -44.0 -47.5 64 -99 SPO 1997 04 18 14 08 9 7.3 -9 700.90 -47.5 -43.9 -47.6 64 -99 SPO 1997 04 18 14 09 10 7.5 -9 700.90 -47.5 -43.7 -47.6 64 -99 SPO 1997 04 18 14 10 11 7.5 -9 700.90 -47.6 -43.5 -47.6 65 -99 SPO 1997 04 18 14 11 11 7.7 -9 700.90 -47.6 -43.3 -47.7 65 -99 SPO 1997 04 18 14 12 12 7.8 -9 700.90 -47.6 -43.2 -47.7 66 -99 SPO 1997 04 18 14 13 13 7.9 -9 700.80 -47.6 -43.0 -47.7 65 -99 SPO 1997 04 18 14 14 13 7.8 -9 700.90 -47.7 -43.0 -47.8 66 -99 SPO 1997 04 18 14 15 13 7.9 -9 700.90 -47.7 -43.0 -47.8 65 -99 SPO 1997 04 18 14 16 14 8.0 -9 700.80 -47.8 -43.1 -47.8 65 -99 SPO 1997 04 18 14 17 15 8.0 -9 700.80 -47.8 -43.2 -47.8 64 -99 SPO 1997 04 18 14 18 15 7.8 -9 700.80 -47.7 -43.4 -47.8 64 -99 SPO 1997 04 18 14 19 15 7.6 -9 700.90 -47.8 -43.3 -47.8 64 -99 SPO 1997 04 18 14 20 15 7.3 -9 700.90 -47.8 -43.2 -47.8 64 -99 SPO 1997 04 18 14 21 14 7.2 -9 700.90 -47.8 -43.2 -47.8 65 -99 SPO 1997 04 18 14 22 14 7.0 -9 700.90 -47.8 -43.2 -47.9 66 -99 SPO 1997 04 18 14 23 14 6.9 -9 700.90 -47.8 -43.6 -47.9 65 -99 SPO 1997 04 18 14 24 15 6.9 -9 700.90 -47.8 -43.8 -47.9 64 -99 SPO 1997 04 18 14 25 16 6.7 -9 701.00 -47.8 -44.0 -47.8 65 -99 SPO 1997 04 18 14 26 16 6.5 -9 701.00 -47.8 -44.3 -47.8 65 -99 SPO 1997 04 18 14 27 16 6.6 -9 701.00 -47.8 -44.5 -47.9 65 -99 SPO 1997 04 18 14 28 16 6.5 -9 701.00 -47.8 -44.4 -47.8 64 -99 SPO 1997 04 18 14 29 16 6.4 -9 701.00 -47.8 -44.1 -47.9 64 -99 SPO 1997 04 18 14 30 17 6.4 -9 701.00 -47.9 -44.0 -47.9 64 -99 SPO 1997 04 18 14 31 17 6.3 -9 701.00 -47.9 -44.2 -48.0 64 -99 SPO 1997 04 18 14 32 18 6.5 -9 701.00 -48.0 -44.6 -48.0 64 -99 SPO 1997 04 18 14 33 19 6.4 -9 701.00 -47.9 -44.8 -47.9 64 -99 SPO 1997 04 18 14 34 19 6.4 -9 701.00 -47.9 -45.0 -47.9 64 -99 SPO 1997 04 18 14 35 19 6.4 -9 701.10 -47.9 -44.9 -47.9 65 -99 SPO 1997 04 18 14 36 18 6.5 -9 701.10 -47.8 -44.6 -47.7 65 -99 SPO 1997 04 18 14 37 19 6.5 -9 701.00 -47.7 -44.4 -47.7 65 -99 SPO 1997 04 18 14 38 19 6.6 -9 701.00 -47.7 -44.0 -47.7 65 -99 SPO 1997 04 18 14 39 19 7.0 -9 701.00 -47.6 -43.8 -47.5 64 -99 SPO 1997 04 18 14 40 21 6.8 -9 701.10 -47.6 -43.9 -47.5 64 -99 SPO 1997 04 18 14 41 23 6.9 -9 701.10 -47.5 -44.1 -47.4 64 -99 SPO 1997 04 18 14 42 25 6.9 -9 701.10 -47.4 -44.2 -47.4 63 -99 SPO 1997 04 18 14 43 27 6.9 -9 701.10 -47.4 -44.3 -47.3 63 -99 SPO 1997 04 18 14 44 30 6.7 -9 701.10 -47.4 -44.4 -47.4 64 -99 SPO 1997 04 18 14 45 31 6.7 -9 701.10 -47.3 -44.5 -47.4 64 -99 SPO 1997 04 18 14 46 32 6.6 -9 701.20 -47.3 -44.8 -47.4 66 -99 SPO 1997 04 18 14 47 34 6.4 -9 701.10 -47.3 -45.0 -47.2 66 -99 SPO 1997 04 18 14 48 35 6.3 -9 701.10 -47.3 -45.2 -47.3 67 -99 SPO 1997 04 18 14 49 35 6.3 -9 701.10 -47.3 -45.3 -47.4 66 -99 SPO 1997 04 18 14 50 35 6.3 -9 701.10 -47.4 -45.4 -47.5 67 -99 SPO 1997 04 18 14 51 35 6.4 -9 701.10 -47.4 -45.4 -47.5 65 -99 SPO 1997 04 18 14 52 36 6.3 -9 701.20 -47.4 -45.5 -47.4 64 -99 SPO 1997 04 18 14 53 37 6.2 -9 701.20 -47.4 -45.6 -47.5 64 -99 SPO 1997 04 18 14 54 39 6.2 -9 701.10 -47.4 -45.6 -47.5 64 -99 SPO 1997 04 18 14 55 41 6.3 -9 701.20 -47.4 -45.6 -47.5 64 -99 SPO 1997 04 18 14 56 44 6.1 -9 701.20 -47.5 -45.7 -47.6 65 -99 SPO 1997 04 18 14 57 47 6.0 -9 701.20 -47.6 -45.9 -47.7 65 -99 SPO 1997 04 18 14 58 49 6.1 -9 701.20 -47.6 -46.1 -47.7 65 -99 SPO 1997 04 18 14 59 47 6.0 -9 701.20 -47.6 -46.4 -47.8 65 -99 SPO 1997 04 18 15 00 46 5.8 -9 701.20 -47.8 -46.4 -47.9 67 0 SPO 1997 04 18 15 01 44 6.2 -9 701.20 -47.8 -46.5 -47.9 66 -99 SPO 1997 04 18 15 02 43 6.2 -9 701.20 -47.8 -46.6 -48.0 66 -99 SPO 1997 04 18 15 03 44 6.7 -9 701.20 -47.9 -46.7 -48.1 67 -99 SPO 1997 04 18 15 04 44 6.7 -9 701.20 -48.0 -46.7 -48.2 67 -99 SPO 1997 04 18 15 05 42 6.6 -9 701.10 -48.1 -46.8 -48.2 67 -99 SPO 1997 04 18 15 06 42 6.9 -9 701.10 -48.1 -46.8 -48.2 66 -99 SPO 1997 04 18 15 07 42 6.9 -9 701.10 -48.1 -46.7 -48.1 66 -99 SPO 1997 04 18 15 08 42 6.8 -9 701.10 -48.1 -46.7 -48.1 66 -99 SPO 1997 04 18 15 09 39 6.9 -9 701.10 -48.1 -46.5 -48.2 66 -99 SPO 1997 04 18 15 10 40 6.9 -9 701.10 -48.1 -46.5 -48.2 66 -99 SPO 1997 04 18 15 11 40 7.0 -9 701.10 -48.2 -46.4 -48.2 66 -99 SPO 1997 04 18 15 12 41 6.8 -9 701.10 -48.1 -46.4 -48.2 65 -99 SPO 1997 04 18 15 13 41 6.7 -9 701.10 -48.2 -46.3 -48.3 65 -99 SPO 1997 04 18 15 14 40 6.7 -9 701.10 -48.2 -46.1 -48.3 66 -99 SPO 1997 04 18 15 15 40 6.5 -9 701.10 -48.2 -46.0 -48.2 66 -99 SPO 1997 04 18 15 16 39 6.5 -9 701.10 -48.2 -46.1 -48.1 66 -99 SPO 1997 04 18 15 17 39 6.3 -9 701.10 -48.1 -46.1 -48.1 66 -99 SPO 1997 04 18 15 18 39 6.7 -9 701.00 -48.2 -45.9 -48.2 66 -99 SPO 1997 04 18 15 19 38 6.6 -9 701.00 -48.2 -45.8 -48.2 65 -99 SPO 1997 04 18 15 20 37 6.8 -9 701.00 -48.1 -45.8 -48.1 64 -99 SPO 1997 04 18 15 21 37 7.1 -9 701.00 -48.1 -45.7 -48.0 63 -99 SPO 1997 04 18 15 22 37 6.9 -9 701.00 -48.0 -45.7 -47.8 64 -99 SPO 1997 04 18 15 23 39 6.9 -9 701.10 -47.9 -45.9 -47.8 65 -99 SPO 1997 04 18 15 24 41 6.6 -9 701.10 -47.9 -46.0 -48.0 65 -99 SPO 1997 04 18 15 25 42 6.6 -9 701.10 -48.0 -46.1 -48.0 66 -99 SPO 1997 04 18 15 26 44 6.7 -9 701.10 -48.0 -46.3 -48.2 65 -99 SPO 1997 04 18 15 27 42 6.5 -9 701.10 -48.1 -46.4 -48.2 66 -99 SPO 1997 04 18 15 28 41 6.4 -9 701.10 -48.1 -46.4 -48.2 66 -99 SPO 1997 04 18 15 29 41 6.5 -9 701.10 -48.2 -46.2 -48.3 66 -99 SPO 1997 04 18 15 30 40 6.5 -9 701.00 -48.2 -46.1 -48.2 66 -99 SPO 1997 04 18 15 31 39 6.8 -9 701.00 -48.2 -46.0 -48.1 66 -99 SPO 1997 04 18 15 32 37 6.7 -9 701.00 -48.1 -45.8 -48.1 65 -99 SPO 1997 04 18 15 33 37 6.3 -9 701.00 -48.1 -45.8 -48.0 65 -99 SPO 1997 04 18 15 34 37 6.3 -9 701.00 -48.0 -45.8 -48.1 65 -99 SPO 1997 04 18 15 35 36 5.9 -9 701.00 -48.1 -45.8 -48.1 66 -99 SPO 1997 04 18 15 36 35 5.7 -9 701.00 -48.1 -45.8 -48.1 66 -99 SPO 1997 04 18 15 37 33 5.5 -9 700.90 -48.1 -45.9 -48.1 66 -99 SPO 1997 04 18 15 38 30 5.5 -9 700.90 -48.1 -45.9 -48.1 66 -99 SPO 1997 04 18 15 39 28 5.5 -9 700.90 -48.0 -45.9 -48.0 66 -99 SPO 1997 04 18 15 40 28 5.6 -9 700.90 -48.0 -45.8 -47.9 66 -99 SPO 1997 04 18 15 41 27 5.6 -9 700.90 -47.9 -45.6 -47.9 64 -99 SPO 1997 04 18 15 42 28 5.7 -9 700.90 -47.8 -45.6 -47.8 65 -99 SPO 1997 04 18 15 43 29 5.8 -9 701.00 -47.7 -45.6 -47.6 65 -99 SPO 1997 04 18 15 44 29 5.8 -9 701.00 -47.6 -45.8 -47.5 65 -99 SPO 1997 04 18 15 45 29 5.7 -9 701.00 -47.6 -46.0 -47.6 65 -99 SPO 1997 04 18 15 46 29 5.5 -9 700.90 -47.6 -46.0 -47.7 65 -99 SPO 1997 04 18 15 47 28 5.4 -9 700.90 -47.7 -46.2 -47.8 66 -99 SPO 1997 04 18 15 48 27 5.2 -9 700.90 -47.7 -46.2 -47.9 66 -99 SPO 1997 04 18 15 49 25 5.2 -9 700.90 -47.8 -46.2 -48.0 66 -99 SPO 1997 04 18 15 50 24 5.1 -9 700.90 -47.9 -46.2 -48.1 66 -99 SPO 1997 04 18 15 51 22 5.0 -9 700.90 -48.0 -46.2 -48.2 66 -99 SPO 1997 04 18 15 52 20 5.1 -9 700.90 -48.1 -46.2 -48.2 66 -99 SPO 1997 04 18 15 53 17 5.0 -9 700.90 -48.2 -46.0 -48.3 66 -99 SPO 1997 04 18 15 54 16 5.1 -9 700.80 -48.2 -45.6 -48.2 66 -99 SPO 1997 04 18 15 55 16 5.6 -9 700.80 -48.3 -45.0 -48.3 66 -99 SPO 1997 04 18 15 56 17 6.0 -9 700.70 -48.3 -44.6 -48.3 65 -99 SPO 1997 04 18 15 57 17 6.1 -9 700.70 -48.3 -44.3 -48.3 64 -99 SPO 1997 04 18 15 58 18 6.5 -9 700.70 -48.3 -44.0 -48.2 64 -99 SPO 1997 04 18 15 59 19 6.6 -9 700.70 -48.2 -43.9 -48.0 64 -99 SPO 1997 04 18 16 00 20 6.6 -9 700.70 -48.0 -43.9 -47.9 64 0 SPO 1997 04 18 16 01 21 6.5 -9 700.70 -47.9 -44.0 -47.8 65 -99 SPO 1997 04 18 16 02 23 6.5 -9 700.80 -47.8 -44.1 -47.7 65 -99 SPO 1997 04 18 16 03 23 6.5 -9 700.80 -47.8 -44.3 -47.8 65 -99 SPO 1997 04 18 16 04 23 6.5 -9 700.80 -47.8 -44.2 -47.9 65 -99 SPO 1997 04 18 16 05 23 6.3 -9 700.70 -47.8 -44.1 -47.9 66 -99 SPO 1997 04 18 16 06 22 6.3 -9 700.80 -47.8 -44.1 -47.8 66 -99 SPO 1997 04 18 16 07 23 6.2 -9 700.70 -47.8 -44.2 -47.8 66 -99 SPO 1997 04 18 16 08 25 6.2 -9 700.80 -47.8 -44.3 -47.9 65 -99 SPO 1997 04 18 16 09 25 6.2 -9 700.80 -47.8 -44.2 -47.9 64 -99 SPO 1997 04 18 16 10 25 6.0 -9 700.80 -47.8 -44.0 -47.9 64 -99 SPO 1997 04 18 16 11 24 5.9 -9 700.70 -47.8 -43.8 -47.9 64 -99 SPO 1997 04 18 16 12 23 5.8 -9 700.70 -47.8 -43.6 -47.8 64 -99 SPO 1997 04 18 16 13 22 5.8 -9 700.70 -47.8 -43.4 -47.9 64 -99 SPO 1997 04 18 16 14 22 5.8 -9 700.70 -47.9 -43.3 -47.8 66 -99 SPO 1997 04 18 16 15 22 6.0 -9 700.70 -47.8 -43.4 -47.8 65 -99 SPO 1997 04 18 16 16 22 5.9 -9 700.70 -47.8 -43.6 -47.7 66 -99 SPO 1997 04 18 16 17 23 5.6 -9 700.70 -47.7 -43.9 -47.6 66 -99 SPO 1997 04 18 16 18 25 5.6 -9 700.70 -47.6 -44.0 -47.6 67 -99 SPO 1997 04 18 16 19 25 5.7 -9 700.70 -47.6 -44.1 -47.6 67 -99 SPO 1997 04 18 16 20 28 5.7 -9 700.80 -47.6 -44.2 -47.4 66 -99 SPO 1997 04 18 16 21 30 5.6 -9 700.80 -47.4 -44.4 -47.2 64 -99 SPO 1997 04 18 16 22 32 5.5 -9 700.80 -47.3 -44.5 -47.2 64 -99 SPO 1997 04 18 16 23 34 5.4 -9 700.70 -47.3 -44.6 -47.4 64 -99 SPO 1997 04 18 16 24 33 5.2 -9 700.70 -47.3 -44.7 -47.4 64 -99 SPO 1997 04 18 16 25 33 5.2 -9 700.80 -47.4 -44.5 -47.4 66 -99 SPO 1997 04 18 16 26 33 5.1 -9 700.80 -47.4 -44.3 -47.5 66 -99 SPO 1997 04 18 16 27 33 5.2 -9 700.80 -47.4 -44.3 -47.5 66 -99 SPO 1997 04 18 16 28 36 5.1 -9 700.80 -47.4 -44.3 -47.5 66 -99 SPO 1997 04 18 16 29 42 5.0 -9 700.80 -47.4 -44.5 -47.5 66 -99 SPO 1997 04 18 16 30 50 4.9 -9 700.80 -47.6 -44.9 -47.7 67 -99 SPO 1997 04 18 16 31 64 4.1 -9 700.90 -47.8 -45.5 -48.0 68 -99 SPO 1997 04 18 16 32 62 4.4 -9 700.90 -48.2 -46.0 -48.4 68 -99 SPO 1997 04 18 16 33 51 4.7 -9 700.80 -48.4 -45.9 -48.7 66 -99 SPO 1997 04 18 16 34 49 4.9 -9 700.90 -48.6 -45.6 -48.6 66 -99 SPO 1997 04 18 16 35 50 4.9 -9 700.80 -48.5 -45.6 -48.4 65 -99 SPO 1997 04 18 16 36 52 4.6 -9 700.90 -48.5 -45.7 -48.4 63 -99 SPO 1997 04 18 16 37 60 4.0 -9 700.90 -48.5 -46.0 -48.5 65 -99 SPO 1997 04 18 16 38 76 3.6 -9 700.90 -48.7 -46.6 -48.8 65 -99 SPO 1997 04 18 16 39 78 3.9 -9 700.90 -49.1 -47.5 -49.5 66 -99 SPO 1997 04 18 16 40 64 4.5 -9 700.80 -49.8 -47.2 -50.1 68 -99 SPO 1997 04 18 16 41 57 5.2 -9 700.80 -50.0 -46.6 -49.9 66 -99 SPO 1997 04 18 16 42 50 5.3 -9 700.80 -50.0 -45.8 -49.7 65 -99 SPO 1997 04 18 16 43 46 5.2 -9 700.80 -49.8 -45.3 -49.6 64 -99 SPO 1997 04 18 16 44 49 5.0 -9 700.80 -49.7 -45.3 -49.5 64 -99 SPO 1997 04 18 16 45 53 4.4 -9 700.80 -49.8 -45.6 -49.6 65 -99 SPO 1997 04 18 16 46 57 3.3 -9 700.80 -49.8 -45.8 -49.8 64 -99 SPO 1997 04 18 16 47 60 3.0 -9 700.80 -50.2 -46.0 -50.2 64 -99 SPO 1997 04 18 16 48 52 3.5 -9 700.80 -50.6 -45.7 -50.6 64 -99 SPO 1997 04 18 16 49 43 4.2 -9 700.70 -50.8 -45.0 -50.6 64 -99 SPO 1997 04 18 16 50 38 4.7 -9 700.70 -50.8 -44.7 -50.6 62 -99 SPO 1997 04 18 16 51 39 5.3 -9 700.70 -50.6 -44.3 -50.1 62 -99 SPO 1997 04 18 16 52 36 5.5 -9 700.70 -50.2 -44.2 -49.4 61 -99 SPO 1997 04 18 16 53 34 5.6 -9 700.70 -49.7 -44.0 -49.1 61 -99 SPO 1997 04 18 16 54 34 5.6 -9 700.70 -49.4 -43.8 -48.8 62 -99 SPO 1997 04 18 16 55 34 5.8 -9 700.70 -49.1 -43.4 -48.6 62 -99 SPO 1997 04 18 16 56 33 6.0 -9 700.70 -48.8 -43.4 -48.5 62 -99 SPO 1997 04 18 16 57 36 6.0 -9 700.70 -48.6 -43.6 -48.3 63 -99 SPO 1997 04 18 16 58 38 5.7 -9 700.70 -48.4 -44.0 -48.2 63 -99 SPO 1997 04 18 16 59 41 5.3 -9 700.70 -48.2 -44.0 -48.0 63 -99 SPO 1997 04 18 17 00 48 4.3 -9 700.70 -48.1 -44.0 -48.2 63 0 SPO 1997 04 18 17 01 61 2.8 -9 700.70 -48.8 -44.6 -49.3 65 -99 SPO 1997 04 18 17 02 58 3.5 -9 700.70 -49.8 -45.4 -50.2 65 -99 SPO 1997 04 18 17 03 55 4.4 -9 700.80 -50.3 -45.7 -50.5 64 -99 SPO 1997 04 18 17 04 56 4.7 -9 700.70 -50.4 -45.8 -50.4 64 -99 SPO 1997 04 18 17 05 52 4.7 -9 700.70 -50.4 -45.5 -50.4 64 -99 SPO 1997 04 18 17 06 47 4.8 -9 700.70 -50.5 -45.2 -50.4 65 -99 SPO 1997 04 18 17 07 43 4.8 -9 700.70 -50.5 -45.0 -50.4 65 -99 SPO 1997 04 18 17 08 40 4.8 -9 700.70 -50.4 -44.8 -50.3 64 -99 SPO 1997 04 18 17 09 38 5.2 -9 700.60 -50.3 -44.6 -50.0 64 -99 SPO 1997 04 18 17 10 38 5.0 -9 700.60 -50.0 -44.6 -49.6 62 -99 SPO 1997 04 18 17 11 39 5.0 -9 700.60 -49.8 -44.5 -49.4 62 -99 SPO 1997 04 18 17 12 43 5.2 -9 700.60 -49.6 -44.5 -49.4 62 -99 SPO 1997 04 18 17 13 47 5.4 -9 700.70 -49.6 -44.7 -49.5 62 -99 SPO 1997 04 18 17 14 49 5.4 -9 700.70 -49.6 -45.0 -49.6 62 -99 SPO 1997 04 18 17 15 49 5.2 -9 700.70 -49.5 -45.1 -49.5 62 -99 SPO 1997 04 18 17 16 53 4.4 -9 700.70 -49.4 -45.1 -49.4 62 -99 SPO 1997 04 18 17 17 60 2.6 -9 700.70 -49.5 -45.4 -49.7 64 -99 SPO 1997 04 18 17 18 59 3.1 -9 700.70 -50.1 -45.8 -50.4 66 -99 SPO 1997 04 18 17 19 59 3.8 -9 700.70 -50.6 -45.5 -50.8 67 -99 SPO 1997 04 18 17 20 60 4.2 -9 700.70 -50.8 -45.4 -50.9 67 -99 SPO 1997 04 18 17 21 60 4.5 -9 700.60 -51.0 -45.2 -51.0 67 -99 SPO 1997 04 18 17 22 58 4.7 -9 700.60 -51.1 -45.3 -51.0 66 -99 SPO 1997 04 18 17 23 54 4.7 -9 700.60 -51.2 -45.2 -51.1 66 -99 SPO 1997 04 18 17 24 53 4.8 -9 700.60 -51.2 -44.8 -51.1 66 -99 SPO 1997 04 18 17 25 57 4.6 -9 700.60 -51.2 -44.5 -51.1 63 -99 SPO 1997 04 18 17 26 59 4.5 -9 700.60 -51.3 -44.5 -51.2 63 -99 SPO 1997 04 18 17 27 60 4.2 -9 700.60 -51.4 -44.8 -51.3 61 -99 SPO 1997 04 18 17 28 59 4.0 -9 700.60 -51.4 -45.0 -51.4 61 -99 SPO 1997 04 18 17 29 65 3.8 -9 700.60 -51.6 -45.1 -51.5 63 -99 SPO 1997 04 18 17 30 68 3.7 -9 700.60 -51.6 -45.5 -51.6 62 -99 SPO 1997 04 18 17 31 69 3.7 -9 700.50 -51.8 -45.7 -51.7 63 -99 SPO 1997 04 18 17 32 67 3.8 -9 700.50 -51.8 -45.6 -51.8 63 -99 SPO 1997 04 18 17 33 68 3.9 -9 700.50 -51.8 -45.4 -51.8 63 -99 SPO 1997 04 18 17 34 67 4.0 -9 700.50 -51.8 -45.2 -51.8 63 -99 SPO 1997 04 18 17 35 67 4.3 -9 700.50 -51.9 -45.2 -51.8 62 -99 SPO 1997 04 18 17 36 64 4.7 -9 700.40 -52.0 -45.1 -52.0 62 -99 SPO 1997 04 18 17 37 59 5.0 -9 700.40 -52.0 -44.6 -52.0 62 -99 SPO 1997 04 18 17 38 56 5.1 -9 700.40 -52.0 -44.2 -52.0 62 -99 SPO 1997 04 18 17 39 54 4.7 -9 700.40 -52.0 -43.9 -51.9 62 -99 SPO 1997 04 18 17 40 52 4.1 -9 700.40 -52.0 -44.1 -51.9 62 -99 SPO 1997 04 18 17 41 49 3.6 -9 700.40 -51.9 -44.6 -51.9 61 -99 SPO 1997 04 18 17 42 44 3.7 -9 700.50 -51.8 -44.9 -51.7 61 -99 SPO 1997 04 18 17 43 46 4.0 -9 700.50 -51.6 -44.9 -51.3 61 -99 SPO 1997 04 18 17 44 50 4.1 -9 700.50 -51.2 -44.9 -50.7 61 -99 SPO 1997 04 18 17 45 53 4.1 -9 700.50 -50.8 -44.7 -50.5 62 -99 SPO 1997 04 18 17 46 56 4.0 -9 700.50 -50.6 -44.4 -50.6 62 -99 SPO 1997 04 18 17 47 55 3.9 -9 700.50 -50.6 -44.4 -50.8 63 -99 SPO 1997 04 18 17 48 55 3.4 -9 700.50 -50.6 -44.5 -50.9 62 -99 SPO 1997 04 18 17 49 54 2.9 -9 700.50 -50.8 -44.9 -51.1 64 -99 SPO 1997 04 18 17 50 53 2.6 -9 700.60 -50.9 -45.8 -51.2 63 -99 SPO 1997 04 18 17 51 56 3.4 -9 700.60 -50.9 -46.1 -51.2 61 -99 SPO 1997 04 18 17 52 61 3.8 -9 700.60 -50.9 -45.9 -51.2 61 -99 SPO 1997 04 18 17 53 62 3.9 -9 700.60 -51.0 -45.4 -51.2 61 -99 SPO 1997 04 18 17 54 60 4.2 -9 700.50 -51.1 -45.1 -51.3 62 -99 SPO 1997 04 18 17 55 54 4.3 -9 700.50 -51.2 -45.4 -51.3 63 -99 SPO 1997 04 18 17 56 52 4.6 -9 700.50 -51.3 -45.4 -51.3 63 -99 SPO 1997 04 18 17 57 52 4.7 -9 700.50 -51.2 -45.0 -51.1 63 -99 SPO 1997 04 18 17 58 54 4.6 -9 700.50 -50.9 -44.6 -50.8 61 -99 SPO 1997 04 18 17 59 54 4.5 -9 700.50 -50.7 -44.4 -50.6 61 -99 SPO 1997 04 18 18 00 56 4.3 -9 700.40 -50.6 -44.3 -50.6 62 0 SPO 1997 04 18 18 01 54 4.7 -9 700.40 -50.6 -44.1 -50.8 62 -99 SPO 1997 04 18 18 02 54 4.9 -9 700.40 -50.7 -44.2 -50.8 63 -99 SPO 1997 04 18 18 03 56 4.6 -9 700.40 -50.7 -44.3 -50.8 62 -99 SPO 1997 04 18 18 04 58 4.5 -9 700.50 -50.7 -44.3 -50.8 62 -99 SPO 1997 04 18 18 05 58 4.6 -9 700.40 -50.7 -44.2 -50.8 62 -99 SPO 1997 04 18 18 06 57 4.6 -9 700.40 -50.7 -44.0 -50.8 63 -99 SPO 1997 04 18 18 07 56 4.8 -9 700.40 -50.7 -44.0 -50.8 64 -99 SPO 1997 04 18 18 08 56 4.8 -9 700.40 -50.7 -44.0 -50.9 64 -99 SPO 1997 04 18 18 09 59 4.6 -9 700.40 -50.8 -43.9 -51.0 65 -99 SPO 1997 04 18 18 10 62 4.6 -9 700.40 -50.9 -44.1 -51.2 65 -99 SPO 1997 04 18 18 11 63 4.5 -9 700.40 -51.2 -44.4 -51.3 66 -99 SPO 1997 04 18 18 12 61 4.6 -9 700.40 -51.4 -44.4 -51.4 66 -99 SPO 1997 04 18 18 13 58 4.6 -9 700.40 -51.5 -44.2 -51.5 66 -99 SPO 1997 04 18 18 14 53 4.3 -9 700.40 -51.5 -44.3 -51.5 65 -99 SPO 1997 04 18 18 15 48 4.3 -9 700.50 -51.5 -44.4 -51.4 64 -99 SPO 1997 04 18 18 16 52 5.0 -9 700.40 -51.4 -44.1 -51.4 63 -99 SPO 1997 04 18 18 17 50 4.4 -9 700.40 -51.3 -44.0 -51.2 62 -99 SPO 1997 04 18 18 18 45 3.7 -9 700.50 -51.3 -44.7 -51.2 62 -99 SPO 1997 04 18 18 19 47 4.0 -9 700.50 -51.2 -45.0 -51.1 62 -99 SPO 1997 04 18 18 20 48 3.9 -9 700.50 -51.1 -45.2 -51.1 62 -99 SPO 1997 04 18 18 21 52 4.2 -9 700.40 -51.0 -45.4 -51.0 63 -99 SPO 1997 04 18 18 22 54 4.4 -9 700.50 -51.0 -45.1 -51.0 63 -99 SPO 1997 04 18 18 23 55 4.7 -9 700.40 -51.0 -44.8 -51.1 63 -99 SPO 1997 04 18 18 24 56 4.9 -9 700.40 -51.1 -44.6 -51.2 64 -99 SPO 1997 04 18 18 25 54 5.0 -9 700.40 -51.1 -44.3 -51.2 64 -99 SPO 1997 04 18 18 26 52 4.9 -9 700.40 -51.2 -44.1 -51.2 65 -99 SPO 1997 04 18 18 27 52 4.9 -9 700.40 -51.2 -44.1 -51.2 63 -99 SPO 1997 04 18 18 28 52 5.0 -9 700.40 -51.2 -43.8 -51.3 63 -99 SPO 1997 04 18 18 29 51 5.1 -9 700.40 -51.2 -43.6 -51.3 63 -99 SPO 1997 04 18 18 30 54 5.1 -9 700.40 -51.2 -43.6 -51.3 63 -99 SPO 1997 04 18 18 31 56 5.4 -9 700.40 -51.3 -43.5 -51.4 63 -99 SPO 1997 04 18 18 32 56 5.6 -9 700.40 -51.4 -43.4 -51.4 63 -99 SPO 1997 04 18 18 33 55 6.1 -9 700.40 -51.4 -43.2 -51.4 63 -99 SPO 1997 04 18 18 34 50 6.6 -9 700.40 -51.3 -42.5 -51.2 63 -99 SPO 1997 04 18 18 35 56 5.3 -9 700.40 -51.2 -42.4 -51.2 63 -99 SPO 1997 04 18 18 36 58 5.3 -9 700.40 -51.3 -43.0 -51.4 64 -99 SPO 1997 04 18 18 37 55 5.2 -9 700.30 -51.4 -43.0 -51.5 64 -99 SPO 1997 04 18 18 38 56 4.9 -9 700.30 -51.5 -43.2 -51.6 65 -99 SPO 1997 04 18 18 39 57 5.2 -9 700.30 -51.4 -43.2 -51.4 63 -99 SPO 1997 04 18 18 40 58 5.5 -9 700.30 -51.4 -42.9 -51.4 63 -99 SPO 1997 04 18 18 41 57 5.7 -9 700.20 -51.4 -42.6 -51.5 63 -99 SPO 1997 04 18 18 42 56 5.8 -9 700.30 -51.5 -41.7 -51.5 63 -99 SPO 1997 04 18 18 43 56 5.8 -9 700.30 -51.5 -41.8 -51.6 63 -99 SPO 1997 04 18 18 44 58 5.4 -9 700.20 -51.5 -41.6 -51.6 63 -99 SPO 1997 04 18 18 45 59 5.4 -9 700.20 -51.5 -41.9 -51.6 63 -99 SPO 1997 04 18 18 46 60 5.3 -9 700.20 -51.5 -41.6 -51.6 63 -99 SPO 1997 04 18 18 47 59 5.5 -9 700.20 -51.6 -41.8 -51.6 64 -99 SPO 1997 04 18 18 48 60 5.6 -9 700.20 -51.6 -41.8 -51.6 64 -99 SPO 1997 04 18 18 49 60 5.5 -9 700.20 -51.5 -41.9 -51.6 63 -99 SPO 1997 04 18 18 50 61 6.0 -9 700.20 -51.5 -41.7 -51.5 63 -99 SPO 1997 04 18 18 51 61 5.3 -9 700.20 -51.5 -41.8 -51.5 63 -99 SPO 1997 04 18 18 52 60 5.1 -9 700.20 -51.5 -41.8 -51.5 63 -99 SPO 1997 04 18 18 53 60 5.5 -9 700.20 -51.5 -42.0 -51.5 62 -99 SPO 1997 04 18 18 54 58 5.4 -9 700.20 -51.4 -41.9 -51.5 60 -99 SPO 1997 04 18 18 55 58 5.5 -9 700.20 -51.4 -42.0 -51.5 61 -99 SPO 1997 04 18 18 56 62 5.5 -9 700.20 -51.4 -42.2 -51.5 62 -99 SPO 1997 04 18 18 57 64 5.8 -9 700.30 -51.4 -42.6 -51.5 62 -99 SPO 1997 04 18 18 58 62 6.1 -9 700.20 -51.4 -42.6 -51.5 62 -99 SPO 1997 04 18 18 59 60 6.2 -9 700.20 -51.4 -42.8 -51.5 61 -99 SPO 1997 04 18 19 00 58 6.5 -9 700.20 -51.4 -42.6 -51.4 61 0 SPO 1997 04 18 19 01 57 6.7 -9 700.20 -51.3 -42.5 -51.2 62 -99 SPO 1997 04 18 19 02 58 6.8 -9 700.20 -51.1 -42.5 -51.0 62 -99 SPO 1997 04 18 19 03 60 6.6 -9 700.20 -50.9 -42.4 -50.8 63 -99 SPO 1997 04 18 19 04 63 6.5 -9 700.20 -50.8 -42.6 -50.9 64 -99 SPO 1997 04 18 19 05 66 6.5 -9 700.20 -50.8 -42.8 -51.0 63 -99 SPO 1997 04 18 19 06 68 6.4 -9 700.20 -50.8 -43.1 -51.1 62 -99 SPO 1997 04 18 19 07 66 6.8 -9 700.20 -51.0 -43.4 -51.2 63 -99 SPO 1997 04 18 19 08 64 6.9 -9 700.10 -51.1 -43.3 -51.2 63 -99 SPO 1997 04 18 19 09 64 6.8 -9 700.10 -51.1 -42.8 -51.2 62 -99 SPO 1997 04 18 19 10 63 6.0 -9 700.10 -51.2 -43.0 -51.2 63 -99 SPO 1997 04 18 19 11 62 6.3 -9 700.20 -51.2 -43.4 -51.3 63 -99 SPO 1997 04 18 19 12 62 6.2 -9 700.10 -51.2 -43.0 -51.3 65 -99 SPO 1997 04 18 19 13 62 6.1 -9 700.10 -51.2 -43.1 -51.4 65 -99 SPO 1997 04 18 19 14 62 5.9 -9 700.20 -51.3 -43.4 -51.4 66 -99 SPO 1997 04 18 19 15 61 6.0 -9 700.20 -51.4 -43.5 -51.5 64 -99 SPO 1997 04 18 19 16 62 5.5 -9 700.10 -51.4 -43.6 -51.5 64 -99 SPO 1997 04 18 19 17 61 5.5 -9 700.20 -51.5 -43.5 -51.6 63 -99 SPO 1997 04 18 19 18 60 5.5 -9 700.10 -51.5 -43.4 -51.6 63 -99 SPO 1997 04 18 19 19 58 5.2 -9 700.10 -51.6 -43.6 -51.6 63 -99 SPO 1997 04 18 19 20 61 5.8 -9 700.10 -51.6 -43.5 -51.7 63 -99 SPO 1997 04 18 19 21 59 5.6 -9 700.10 -51.6 -43.6 -51.7 62 -99 SPO 1997 04 18 19 22 60 5.7 -9 700.10 -51.7 -43.9 -51.7 63 -99 SPO 1997 04 18 19 23 59 5.9 -9 700.10 -51.7 -43.4 -51.7 63 -99 SPO 1997 04 18 19 24 60 5.6 -9 700.10 -51.7 -43.6 -51.7 63 -99 SPO 1997 04 18 19 25 61 5.6 -9 700.10 -51.7 -43.8 -51.8 63 -99 SPO 1997 04 18 19 26 60 5.4 -9 700.10 -51.8 -43.9 -51.8 63 -99 SPO 1997 04 18 19 27 59 5.7 -9 700.10 -51.8 -43.7 -51.8 63 -99 SPO 1997 04 18 19 28 59 5.6 -9 700.00 -51.8 -43.5 -51.7 63 -99 SPO 1997 04 18 19 29 57 5.5 -9 700.00 -51.7 -43.4 -51.7 62 -99 SPO 1997 04 18 19 30 57 5.9 -9 700.00 -51.6 -42.7 -51.6 60 -99 SPO 1997 04 18 19 31 56 5.9 -9 700.00 -51.6 -42.2 -51.5 60 -99 SPO 1997 04 18 19 32 53 6.0 -9 699.90 -51.4 -42.1 -51.4 60 -99 SPO 1997 04 18 19 33 54 6.2 -9 699.90 -51.3 -41.8 -51.2 62 -99 SPO 1997 04 18 19 34 53 6.3 -9 699.90 -51.1 -41.2 -51.0 62 -99 SPO 1997 04 18 19 35 54 6.5 -9 699.90 -51.0 -41.3 -50.8 63 -99 SPO 1997 04 18 19 36 55 6.7 -9 699.90 -50.8 -41.2 -50.7 63 -99 SPO 1997 04 18 19 37 54 6.4 -9 699.90 -50.7 -41.4 -50.8 64 -99 SPO 1997 04 18 19 38 55 6.6 -9 699.90 -50.6 -41.3 -50.6 64 -99 SPO 1997 04 18 19 39 55 7.1 -9 699.90 -50.5 -41.3 -50.6 64 -99 SPO 1997 04 18 19 40 54 7.2 -9 699.90 -50.4 -41.2 -50.3 64 -99 SPO 1997 04 18 19 41 52 5.4 -9 699.90 -50.2 -41.9 -50.3 64 -99 SPO 1997 04 18 19 42 52 5.6 -9 699.90 -50.2 -43.1 -50.2 64 -99 SPO 1997 04 18 19 43 55 6.3 -9 699.90 -50.0 -42.6 -50.0 63 -99 SPO 1997 04 18 19 44 55 6.2 -9 699.90 -49.9 -42.3 -50.0 63 -99 SPO 1997 04 18 19 45 56 6.4 -9 699.90 -49.8 -42.2 -49.8 64 -99 SPO 1997 04 18 19 46 57 6.5 -9 699.80 -49.8 -42.0 -49.7 65 -99 SPO 1997 04 18 19 47 56 6.1 -9 699.80 -49.6 -42.4 -49.8 65 -99 SPO 1997 04 18 19 48 57 6.4 -9 699.90 -49.5 -42.1 -49.6 65 -99 SPO 1997 04 18 19 49 55 5.1 -9 699.80 -49.5 -43.2 -49.7 65 -99 SPO 1997 04 18 19 50 61 6.1 -9 699.80 -49.5 -42.9 -49.7 65 -99 SPO 1997 04 18 19 51 57 5.8 -9 699.80 -49.5 -43.0 -49.7 65 -99 SPO 1997 04 18 19 52 62 6.6 -9 699.80 -49.6 -42.8 -49.7 66 -99 SPO 1997 04 18 19 53 58 5.7 -9 699.80 -49.6 -43.0 -49.8 65 -99 SPO 1997 04 18 19 54 59 6.1 -9 699.80 -49.6 -43.1 -49.8 64 -99 SPO 1997 04 18 19 55 58 5.8 -9 699.80 -49.6 -43.3 -49.8 64 -99 SPO 1997 04 18 19 56 58 6.0 -9 699.80 -49.7 -43.0 -49.7 64 -99 SPO 1997 04 18 19 57 56 5.6 -9 699.70 -49.6 -43.0 -49.7 64 -99 SPO 1997 04 18 19 58 55 5.8 -9 699.80 -49.6 -43.2 -49.6 64 -99 SPO 1997 04 18 19 59 55 6.0 -9 699.70 -49.5 -43.0 -49.5 65 -99 SPO 1997 04 18 20 00 55 5.9 -9 699.70 -49.4 -43.0 -49.4 65 0 SPO 1997 04 18 20 01 56 6.0 -9 699.70 -49.3 -43.3 -49.4 65 -99 SPO 1997 04 18 20 02 55 5.8 -9 699.70 -49.3 -43.2 -49.4 66 -99 SPO 1997 04 18 20 03 55 6.0 -9 699.70 -49.2 -43.6 -49.3 65 -99 SPO 1997 04 18 20 04 56 5.7 -9 699.70 -49.2 -43.9 -49.3 66 -99 SPO 1997 04 18 20 05 57 5.7 -9 699.70 -49.3 -44.2 -49.4 67 -99 SPO 1997 04 18 20 06 58 6.0 -9 699.70 -49.3 -44.0 -49.4 66 -99 SPO 1997 04 18 20 07 60 6.0 -9 699.70 -49.2 -43.8 -49.4 65 -99 SPO 1997 04 18 20 08 61 6.1 -9 699.70 -49.3 -43.8 -49.4 65 -99 SPO 1997 04 18 20 09 61 5.8 -9 699.70 -49.4 -43.9 -49.5 65 -99 SPO 1997 04 18 20 10 63 5.9 -9 699.70 -49.4 -44.0 -49.5 64 -99 SPO 1997 04 18 20 11 59 5.3 -9 699.70 -49.4 -44.2 -49.6 64 -99 SPO 1997 04 18 20 12 62 5.5 -9 699.70 -49.5 -44.2 -49.6 65 -99 SPO 1997 04 18 20 13 60 5.7 -9 699.70 -49.6 -44.4 -49.7 65 -99 SPO 1997 04 18 20 14 59 6.0 -9 699.70 -49.7 -44.2 -49.7 66 -99 SPO 1997 04 18 20 15 58 5.9 -9 699.70 -49.7 -44.2 -49.7 66 -99 SPO 1997 04 18 20 16 59 5.9 -9 699.70 -49.6 -44.2 -49.6 65 -99 SPO 1997 04 18 20 17 59 6.0 -9 699.60 -49.6 -43.9 -49.6 65 -99 SPO 1997 04 18 20 18 57 5.8 -9 699.60 -49.6 -44.0 -49.6 65 -99 SPO 1997 04 18 20 19 57 6.4 -9 699.60 -49.5 -43.8 -49.4 65 -99 SPO 1997 04 18 20 20 53 6.2 -9 699.60 -49.3 -43.6 -49.2 63 -99 SPO 1997 04 18 20 21 52 5.9 -9 699.60 -49.2 -43.9 -49.1 63 -99 SPO 1997 04 18 20 22 53 6.1 -9 699.60 -49.0 -43.5 -49.0 63 -99 SPO 1997 04 18 20 23 56 6.2 -9 699.60 -49.0 -43.5 -49.1 64 -99 SPO 1997 04 18 20 24 55 6.1 -9 699.60 -49.0 -43.8 -49.0 65 -99 SPO 1997 04 18 20 25 55 6.3 -9 699.60 -49.0 -43.8 -49.0 66 -99 SPO 1997 04 18 20 26 58 6.3 -9 699.60 -48.9 -43.7 -48.9 66 -99 SPO 1997 04 18 20 27 59 6.4 -9 699.60 -48.8 -43.6 -49.0 66 -99 SPO 1997 04 18 20 28 58 6.5 -9 699.60 -48.8 -43.5 -48.9 67 -99 SPO 1997 04 18 20 29 58 6.4 -9 699.60 -48.8 -43.2 -49.0 67 -99 SPO 1997 04 18 20 30 56 6.2 -9 699.60 -48.8 -43.4 -49.0 67 -99 SPO 1997 04 18 20 31 56 6.4 -9 699.60 -48.8 -43.4 -48.9 66 -99 SPO 1997 04 18 20 32 55 6.3 -9 699.60 -48.8 -43.7 -48.8 66 -99 SPO 1997 04 18 20 33 55 6.1 -9 699.50 -48.7 -43.7 -48.7 64 -99 SPO 1997 04 18 20 34 55 6.4 -9 699.50 -48.6 -43.8 -48.6 63 -99 SPO 1997 04 18 20 35 54 6.0 -9 699.50 -48.6 -43.8 -48.6 63 -99 SPO 1997 04 18 20 36 53 5.7 -9 699.50 -48.5 -43.9 -48.6 65 -99 SPO 1997 04 18 20 37 51 5.7 -9 699.50 -48.5 -44.4 -48.6 66 -99 SPO 1997 04 18 20 38 52 5.7 -9 699.50 -48.6 -44.5 -48.6 68 -99 SPO 1997 04 18 20 39 53 5.7 -9 699.50 -48.5 -44.3 -48.6 67 -99 SPO 1997 04 18 20 40 52 5.6 -9 699.50 -48.5 -44.0 -48.6 67 -99 SPO 1997 04 18 20 41 53 5.8 -9 699.50 -48.5 -44.1 -48.6 67 -99 SPO 1997 04 18 20 42 53 5.9 -9 699.50 -48.6 -44.3 -48.6 67 -99 SPO 1997 04 18 20 43 55 6.2 -9 699.50 -48.5 -44.3 -48.6 66 -99 SPO 1997 04 18 20 44 56 6.1 -9 699.50 -48.5 -44.1 -48.5 63 -99 SPO 1997 04 18 20 45 56 6.2 -9 699.40 -48.5 -43.8 -48.6 63 -99 SPO 1997 04 18 20 46 55 6.1 -9 699.50 -48.6 -43.8 -48.6 64 -99 SPO 1997 04 18 20 47 56 6.0 -9 699.50 -48.6 -44.0 -48.6 66 -99 SPO 1997 04 18 20 48 56 5.8 -9 699.50 -48.5 -44.1 -48.7 65 -99 SPO 1997 04 18 20 49 57 5.7 -9 699.40 -48.6 -44.2 -48.6 66 -99 SPO 1997 04 18 20 50 59 5.9 -9 699.40 -48.6 -44.0 -48.6 66 -99 SPO 1997 04 18 20 51 58 5.9 -9 699.40 -48.6 -44.0 -48.7 66 -99 SPO 1997 04 18 20 52 56 5.5 -9 699.50 -48.6 -44.5 -48.7 66 -99 SPO 1997 04 18 20 53 57 5.2 -9 699.50 -48.7 -44.6 -48.7 68 -99 SPO 1997 04 18 20 54 57 5.1 -9 699.40 -48.7 -45.1 -48.8 68 -99 SPO 1997 04 18 20 55 58 5.2 -9 699.40 -48.8 -45.1 -48.9 68 -99 SPO 1997 04 18 20 56 57 5.6 -9 699.40 -48.8 -45.2 -49.0 67 -99 SPO 1997 04 18 20 57 61 5.6 -9 699.40 -48.9 -44.7 -49.0 65 -99 SPO 1997 04 18 20 58 62 5.4 -9 699.40 -49.0 -44.9 -49.1 65 -99 SPO 1997 04 18 20 59 68 5.9 -9 699.40 -49.1 -44.5 -49.2 65 -99 SPO 1997 04 18 21 00 67 5.9 -9 699.40 -49.2 -44.3 -49.2 65 0 SPO 1997 04 18 21 01 68 5.9 -9 699.40 -49.3 -44.4 -49.3 67 -99 SPO 1997 04 18 21 02 67 6.0 -9 699.40 -49.3 -44.8 -49.3 67 -99 SPO 1997 04 18 21 03 67 5.9 -9 699.40 -49.2 -44.7 -49.3 66 -99 SPO 1997 04 18 21 04 69 5.9 -9 699.40 -49.3 -44.9 -49.4 67 -99 SPO 1997 04 18 21 05 70 5.7 -9 699.40 -49.4 -45.0 -49.4 68 -99 SPO 1997 04 18 21 06 69 5.8 -9 699.40 -49.4 -45.1 -49.4 67 -99 SPO 1997 04 18 21 07 69 5.8 -9 699.40 -49.4 -45.2 -49.4 66 -99 SPO 1997 04 18 21 08 70 5.7 -9 699.40 -49.3 -45.2 -49.4 65 -99 SPO 1997 04 18 21 09 69 5.8 -9 699.40 -49.4 -45.4 -49.4 64 -99 SPO 1997 04 18 21 10 68 5.7 -9 699.40 -49.5 -45.4 -49.5 65 -99 SPO 1997 04 18 21 11 68 5.8 -9 699.40 -49.5 -45.3 -49.5 64 -99 SPO 1997 04 18 21 12 70 6.0 -9 699.40 -49.5 -45.0 -49.6 64 -99 SPO 1997 04 18 21 13 67 5.8 -9 699.40 -49.5 -45.0 -49.5 65 -99 SPO 1997 04 18 21 14 70 5.9 -9 699.40 -49.6 -44.8 -49.6 66 -99 SPO 1997 04 18 21 15 69 5.6 -9 699.40 -49.6 -44.9 -49.6 66 -99 SPO 1997 04 18 21 16 68 5.5 -9 699.40 -49.6 -44.9 -49.6 66 -99 SPO 1997 04 18 21 17 66 5.3 -9 699.40 -49.6 -44.8 -49.6 66 -99 SPO 1997 04 18 21 18 70 5.7 -9 699.40 -49.6 -44.5 -49.6 66 -99 SPO 1997 04 18 21 19 64 5.2 -9 699.40 -49.6 -44.7 -49.6 66 -99 SPO 1997 04 18 21 20 68 5.7 -9 699.40 -49.5 -44.5 -49.5 65 -99 SPO 1997 04 18 21 21 64 5.4 -9 699.40 -49.4 -44.6 -49.5 64 -99 SPO 1997 04 18 21 22 65 5.8 -9 699.30 -49.4 -44.4 -49.5 64 -99 SPO 1997 04 18 21 23 65 6.0 -9 699.30 -49.4 -44.3 -49.4 62 -99 SPO 1997 04 18 21 24 65 6.1 -9 699.30 -49.3 -44.1 -49.3 62 -99 SPO 1997 04 18 21 25 64 6.1 -9 699.30 -49.2 -43.9 -49.3 62 -99 SPO 1997 04 18 21 26 65 6.1 -9 699.30 -49.2 -43.7 -49.3 62 -99 SPO 1997 04 18 21 27 66 6.1 -9 699.30 -49.2 -43.8 -49.3 63 -99 SPO 1997 04 18 21 28 67 6.2 -9 699.30 -49.2 -43.9 -49.3 65 -99 SPO 1997 04 18 21 29 68 6.2 -9 699.30 -49.2 -44.0 -49.3 65 -99 SPO 1997 04 18 21 30 68 6.2 -9 699.30 -49.2 -44.0 -49.3 66 -99 SPO 1997 04 18 21 31 69 6.2 -9 699.30 -49.2 -44.1 -49.3 67 -99 SPO 1997 04 18 21 32 69 6.0 -9 699.30 -49.2 -44.2 -49.3 67 -99 SPO 1997 04 18 21 33 70 5.9 -9 699.30 -49.2 -44.3 -49.3 66 -99 SPO 1997 04 18 21 34 70 6.0 -9 699.20 -49.3 -44.4 -49.4 66 -99 SPO 1997 04 18 21 35 69 5.8 -9 699.30 -49.3 -44.3 -49.4 65 -99 SPO 1997 04 18 21 36 69 5.9 -9 699.20 -49.3 -44.3 -49.4 65 -99 SPO 1997 04 18 21 37 69 5.9 -9 699.20 -49.3 -44.4 -49.4 65 -99 SPO 1997 04 18 21 38 69 6.2 -9 699.20 -49.3 -44.4 -49.3 65 -99 SPO 1997 04 18 21 39 69 6.0 -9 699.20 -49.3 -44.6 -49.2 65 -99 SPO 1997 04 18 21 40 69 6.0 -9 699.20 -49.2 -44.7 -49.2 65 -99 SPO 1997 04 18 21 41 71 5.8 -9 699.20 -49.1 -44.8 -49.2 65 -99 SPO 1997 04 18 21 42 70 5.7 -9 699.20 -49.1 -44.8 -49.2 65 -99 SPO 1997 04 18 21 43 71 5.8 -9 699.20 -49.1 -44.8 -49.2 65 -99 SPO 1997 04 18 21 44 69 5.7 -9 699.20 -49.2 -45.0 -49.3 65 -99 SPO 1997 04 18 21 45 68 5.7 -9 699.20 -49.2 -45.0 -49.3 65 -99 SPO 1997 04 18 21 46 67 5.7 -9 699.20 -49.2 -44.9 -49.3 65 -99 SPO 1997 04 18 21 47 67 6.0 -9 699.20 -49.2 -44.7 -49.2 65 -99 SPO 1997 04 18 21 48 67 6.2 -9 699.20 -49.2 -44.5 -49.2 64 -99 SPO 1997 04 18 21 49 65 6.1 -9 699.20 -49.2 -44.6 -49.3 64 -99 SPO 1997 04 18 21 50 66 6.5 -9 699.10 -49.2 -44.6 -49.2 65 -99 SPO 1997 04 18 21 51 62 6.2 -9 699.20 -49.2 -44.6 -49.3 65 -99 SPO 1997 04 18 21 52 66 6.8 -9 699.20 -49.2 -44.3 -49.3 66 -99 SPO 1997 04 18 21 53 63 6.4 -9 699.10 -49.2 -44.5 -49.2 67 -99 SPO 1997 04 18 21 54 64 6.7 -9 699.10 -49.2 -44.2 -49.3 67 -99 SPO 1997 04 18 21 55 63 6.6 -9 699.10 -49.2 -44.2 -49.3 66 -99 SPO 1997 04 18 21 56 64 6.5 -9 699.10 -49.2 -44.2 -49.3 66 -99 SPO 1997 04 18 21 57 65 6.4 -9 699.10 -49.3 -44.2 -49.4 66 -99 SPO 1997 04 18 21 58 67 6.5 -9 699.10 -49.3 -44.2 -49.4 65 -99 SPO 1997 04 18 21 59 66 6.6 -9 699.10 -49.3 -44.3 -49.5 63 -99 SPO 1997 04 18 22 00 67 6.4 -9 699.10 -49.4 -44.3 -49.5 64 0 SPO 1997 04 18 22 01 66 6.4 -9 699.10 -49.5 -44.3 -49.6 64 -99 SPO 1997 04 18 22 02 65 6.4 -9 699.10 -49.5 -44.2 -49.6 63 -99 SPO 1997 04 18 22 03 64 6.5 -9 699.00 -49.5 -44.1 -49.6 64 -99 SPO 1997 04 18 22 04 62 6.3 -9 699.10 -49.5 -44.0 -49.6 65 -99 SPO 1997 04 18 22 05 61 6.4 -9 699.10 -49.6 -44.0 -49.6 66 -99 SPO 1997 04 18 22 06 62 6.4 -9 699.10 -49.5 -44.0 -49.5 66 -99 SPO 1997 04 18 22 07 64 6.6 -9 699.10 -49.5 -44.2 -49.5 67 -99 SPO 1997 04 18 22 08 66 6.6 -9 699.10 -49.5 -44.4 -49.6 67 -99 SPO 1997 04 18 22 09 66 6.5 -9 699.10 -49.5 -44.6 -49.5 67 -99 SPO 1997 04 18 22 10 65 6.3 -9 699.10 -49.5 -44.7 -49.5 66 -99 SPO 1997 04 18 22 11 64 6.2 -9 699.10 -49.5 -44.7 -49.6 65 -99 SPO 1997 04 18 22 12 63 6.2 -9 699.10 -49.5 -44.7 -49.6 65 -99 SPO 1997 04 18 22 13 63 6.2 -9 699.10 -49.5 -44.6 -49.6 64 -99 SPO 1997 04 18 22 14 62 6.3 -9 699.10 -49.6 -44.6 -49.5 64 -99 SPO 1997 04 18 22 15 62 6.3 -9 699.10 -49.5 -44.6 -49.5 64 -99 SPO 1997 04 18 22 16 61 6.4 -9 699.00 -49.4 -44.6 -49.5 64 -99 SPO 1997 04 18 22 17 62 6.3 -9 699.00 -49.4 -44.5 -49.5 65 -99 SPO 1997 04 18 22 18 62 6.3 -9 699.00 -49.4 -44.6 -49.4 65 -99 SPO 1997 04 18 22 19 63 6.3 -9 699.00 -49.4 -44.6 -49.5 65 -99 SPO 1997 04 18 22 20 63 6.2 -9 699.00 -49.4 -44.5 -49.5 65 -99 SPO 1997 04 18 22 21 62 6.2 -9 699.00 -49.4 -44.5 -49.5 65 -99 SPO 1997 04 18 22 22 62 6.2 -9 699.00 -49.4 -44.6 -49.5 64 -99 SPO 1997 04 18 22 23 62 6.1 -9 699.00 -49.5 -44.6 -49.5 65 -99 SPO 1997 04 18 22 24 62 6.1 -9 699.00 -49.5 -44.6 -49.6 63 -99 SPO 1997 04 18 22 25 62 6.1 -9 699.00 -49.6 -44.6 -49.6 65 -99 SPO 1997 04 18 22 26 62 6.2 -9 699.00 -49.6 -44.7 -49.7 65 -99 SPO 1997 04 18 22 27 63 6.3 -9 699.00 -49.6 -44.7 -49.7 65 -99 SPO 1997 04 18 22 28 63 6.4 -9 699.00 -49.6 -44.7 -49.7 65 -99 SPO 1997 04 18 22 29 63 6.5 -9 699.00 -49.6 -44.6 -49.6 65 -99 SPO 1997 04 18 22 30 63 6.6 -9 699.00 -49.6 -44.6 -49.6 65 -99 SPO 1997 04 18 22 31 62 6.6 -9 699.00 -49.5 -44.6 -49.5 65 -99 SPO 1997 04 18 22 32 62 6.6 -9 699.00 -49.4 -44.7 -49.4 65 -99 SPO 1997 04 18 22 33 62 6.5 -9 699.00 -49.4 -44.8 -49.4 65 -99 SPO 1997 04 18 22 34 62 6.4 -9 698.90 -49.4 -44.8 -49.4 66 -99 SPO 1997 04 18 22 35 63 6.2 -9 699.00 -49.3 -44.8 -49.4 65 -99 SPO 1997 04 18 22 36 63 6.2 -9 698.90 -49.3 -44.8 -49.4 65 -99 SPO 1997 04 18 22 37 63 6.2 -9 699.00 -49.4 -44.8 -49.5 64 -99 SPO 1997 04 18 22 38 63 6.1 -9 699.00 -49.4 -44.8 -49.5 64 -99 SPO 1997 04 18 22 39 64 6.1 -9 699.00 -49.4 -44.8 -49.5 64 -99 SPO 1997 04 18 22 40 65 6.1 -9 699.00 -49.4 -44.8 -49.5 65 -99 SPO 1997 04 18 22 41 65 6.1 -9 699.00 -49.4 -44.9 -49.6 64 -99 SPO 1997 04 18 22 42 65 6.0 -9 699.00 -49.6 -45.0 -49.6 65 -99 SPO 1997 04 18 22 43 66 6.1 -9 699.00 -49.6 -45.1 -49.6 65 -99 SPO 1997 04 18 22 44 66 6.3 -9 699.00 -49.6 -45.1 -49.7 65 -99 SPO 1997 04 18 22 45 68 6.2 -9 699.00 -49.6 -45.2 -49.7 65 -99 SPO 1997 04 18 22 46 68 6.2 -9 699.00 -49.7 -45.2 -49.8 66 -99 SPO 1997 04 18 22 47 67 6.4 -9 699.00 -49.8 -45.2 -49.9 67 -99 SPO 1997 04 18 22 48 65 6.4 -9 699.00 -49.8 -45.3 -49.8 65 -99 SPO 1997 04 18 22 49 65 6.4 -9 699.00 -49.8 -45.3 -49.8 65 -99 SPO 1997 04 18 22 50 64 6.6 -9 699.00 -49.8 -45.3 -49.8 64 -99 SPO 1997 04 18 22 51 65 6.6 -9 699.00 -49.8 -45.3 -49.7 64 -99 SPO 1997 04 18 22 52 63 6.4 -9 699.00 -49.6 -45.2 -49.7 63 -99 SPO 1997 04 18 22 53 63 6.5 -9 699.00 -49.6 -45.3 -49.7 63 -99 SPO 1997 04 18 22 54 64 6.8 -9 699.00 -49.6 -45.2 -49.7 64 -99 SPO 1997 04 18 22 55 63 6.6 -9 699.00 -49.6 -45.2 -49.6 65 -99 SPO 1997 04 18 22 56 63 6.3 -9 698.90 -49.6 -45.2 -49.6 65 -99 SPO 1997 04 18 22 57 64 6.5 -9 698.90 -49.5 -45.2 -49.6 65 -99 SPO 1997 04 18 22 58 64 6.4 -9 698.90 -49.5 -45.0 -49.5 65 -99 SPO 1997 04 18 22 59 63 6.3 -9 698.90 -49.5 -45.0 -49.5 65 -99 SPO 1997 04 18 23 00 63 6.3 -9 698.90 -49.4 -45.2 -49.5 64 0 SPO 1997 04 18 23 01 62 6.3 -9 698.90 -49.4 -45.2 -49.5 65 -99 SPO 1997 04 18 23 02 62 6.3 -9 698.90 -49.4 -45.2 -49.4 65 -99 SPO 1997 04 18 23 03 61 6.4 -9 698.90 -49.3 -45.2 -49.4 64 -99 SPO 1997 04 18 23 04 62 6.4 -9 698.90 -49.3 -45.2 -49.4 64 -99 SPO 1997 04 18 23 05 61 6.3 -9 698.90 -49.4 -45.2 -49.5 65 -99 SPO 1997 04 18 23 06 61 6.4 -9 698.90 -49.4 -45.3 -49.5 65 -99 SPO 1997 04 18 23 07 61 6.4 -9 698.90 -49.5 -45.4 -49.5 65 -99 SPO 1997 04 18 23 08 62 6.6 -9 698.90 -49.5 -45.4 -49.6 65 -99 SPO 1997 04 18 23 09 63 6.6 -9 698.90 -49.6 -45.5 -49.6 66 -99 SPO 1997 04 18 23 10 60 6.1 -9 698.90 -49.6 -45.6 -49.6 65 -99 SPO 1997 04 18 23 11 59 6.1 -9 698.90 -49.5 -45.7 -49.5 65 -99 SPO 1997 04 18 23 12 61 6.2 -9 698.90 -49.4 -45.8 -49.6 64 -99 SPO 1997 04 18 23 13 61 6.1 -9 698.90 -49.5 -45.9 -49.6 65 -99 SPO 1997 04 18 23 14 60 6.0 -9 698.90 -49.6 -45.9 -49.6 65 -99 SPO 1997 04 18 23 15 61 6.1 -9 698.90 -49.6 -45.9 -49.7 65 -99 SPO 1997 04 18 23 16 60 5.8 -9 699.00 -49.6 -45.9 -49.7 64 -99 SPO 1997 04 18 23 17 60 5.5 -9 699.00 -49.6 -46.0 -49.7 62 -99 SPO 1997 04 18 23 18 62 5.8 -9 698.90 -49.7 -46.1 -49.8 63 -99 SPO 1997 04 18 23 19 63 5.8 -9 698.90 -49.8 -46.2 -49.9 64 -99 SPO 1997 04 18 23 20 61 5.5 -9 698.90 -49.9 -46.3 -49.9 65 -99 SPO 1997 04 18 23 21 59 5.3 -9 698.90 -49.9 -46.3 -50.0 65 -99 SPO 1997 04 18 23 22 57 5.1 -9 699.00 -49.9 -46.3 -50.0 65 -99 SPO 1997 04 18 23 23 58 5.5 -9 698.90 -50.0 -46.2 -50.0 66 -99 SPO 1997 04 18 23 24 58 5.3 -9 698.90 -50.0 -46.2 -49.9 66 -99 SPO 1997 04 18 23 25 61 5.5 -9 698.90 -50.0 -46.3 -50.0 65 -99 SPO 1997 04 18 23 26 62 5.7 -9 698.90 -50.1 -46.2 -50.1 64 -99 SPO 1997 04 18 23 27 61 5.4 -9 698.90 -50.1 -46.3 -50.2 63 -99 SPO 1997 04 18 23 28 58 4.8 -9 698.90 -50.2 -46.4 -50.4 64 -99 SPO 1997 04 18 23 29 56 4.5 -9 698.90 -50.4 -46.6 -50.4 64 -99 SPO 1997 04 18 23 30 57 4.6 -9 698.90 -50.4 -46.6 -50.5 64 -99 SPO 1997 04 18 23 31 58 4.8 -9 698.90 -50.4 -46.6 -50.5 64 -99 SPO 1997 04 18 23 32 59 5.2 -9 698.90 -50.5 -46.4 -50.5 65 -99 SPO 1997 04 18 23 33 60 5.0 -9 698.90 -50.6 -46.4 -50.6 64 -99 SPO 1997 04 18 23 34 60 4.7 -9 698.90 -50.8 -46.6 -50.8 65 -99 SPO 1997 04 18 23 35 59 4.4 -9 698.90 -50.9 -46.8 -50.9 65 -99 SPO 1997 04 18 23 36 59 4.6 -9 698.90 -51.0 -47.0 -51.0 65 -99 SPO 1997 04 18 23 37 59 5.2 -9 698.90 -51.1 -47.1 -51.0 65 -99 SPO 1997 04 18 23 38 56 5.1 -9 698.90 -51.1 -47.1 -51.1 64 -99 SPO 1997 04 18 23 39 55 5.2 -9 698.90 -51.1 -47.2 -51.1 64 -99 SPO 1997 04 18 23 40 56 5.4 -9 698.90 -51.1 -47.1 -51.0 63 -99 SPO 1997 04 18 23 41 57 5.4 -9 698.90 -51.0 -47.0 -51.0 62 -99 SPO 1997 04 18 23 42 60 5.5 -9 698.90 -51.0 -46.8 -51.0 61 -99 SPO 1997 04 18 23 43 60 5.2 -9 698.90 -51.0 -46.6 -51.1 63 -99 SPO 1997 04 18 23 44 61 5.3 -9 698.90 -51.1 -46.7 -51.1 64 -99 SPO 1997 04 18 23 45 61 5.3 -9 698.80 -51.2 -46.7 -51.2 65 -99 SPO 1997 04 18 23 46 60 5.5 -9 698.80 -51.2 -46.7 -51.2 63 -99 SPO 1997 04 18 23 47 60 5.5 -9 698.80 -51.3 -46.8 -51.3 63 -99 SPO 1997 04 18 23 48 59 5.3 -9 698.90 -51.4 -46.9 -51.3 64 -99 SPO 1997 04 18 23 49 59 5.3 -9 698.80 -51.4 -46.9 -51.4 64 -99 SPO 1997 04 18 23 50 58 5.3 -9 698.80 -51.4 -47.0 -51.4 63 -99 SPO 1997 04 18 23 51 56 5.3 -9 698.80 -51.4 -47.0 -51.4 62 -99 SPO 1997 04 18 23 52 54 5.4 -9 698.80 -51.5 -47.1 -51.4 62 -99 SPO 1997 04 18 23 53 52 5.6 -9 698.80 -51.4 -47.2 -51.4 60 -99 SPO 1997 04 18 23 54 51 5.6 -9 698.80 -51.3 -47.1 -51.3 60 -99 SPO 1997 04 18 23 55 49 5.7 -9 698.80 -51.3 -47.1 -51.2 61 -99 SPO 1997 04 18 23 56 50 6.0 -9 698.80 -51.2 -47.1 -51.2 61 -99 SPO 1997 04 18 23 57 52 6.1 -9 698.80 -51.2 -47.1 -51.1 63 -99 SPO 1997 04 18 23 58 53 6.2 -9 698.80 -51.1 -47.0 -51.0 -99 -99 SPO 1997 04 18 23 59 53 6.1 -9 698.80 -51.0 -47.0 -51.0 -99 -99 SPO 1997 04 19 00 00 52 6.0 -9 698.80 -51.0 -47.2 -51.1 -99 0 SPO 1997 04 19 00 01 52 5.8 -9 698.80 -51.0 -47.2 -51.1 -99 -99 SPO 1997 04 19 00 02 52 5.9 -9 698.70 -51.0 -47.2 -51.0 -99 -99 SPO 1997 04 19 00 03 52 5.9 -9 698.70 -50.9 -47.1 -51.0 -99 -99 SPO 1997 04 19 00 04 51 5.9 -9 698.70 -50.9 -47.1 -50.9 -99 -99 SPO 1997 04 19 00 05 51 6.0 -9 698.70 -50.8 -47.1 -50.8 -99 -99 SPO 1997 04 19 00 06 49 5.8 -9 698.70 -50.7 -47.1 -50.8 -99 -99 SPO 1997 04 19 00 07 49 5.9 -9 698.60 -50.7 -47.1 -50.7 -99 -99 SPO 1997 04 19 00 08 49 6.0 -9 698.70 -50.6 -47.1 -50.5 -99 -99 SPO 1997 04 19 00 09 50 6.3 -9 698.60 -50.4 -47.1 -50.4 -99 -99 SPO 1997 04 19 00 10 49 6.1 -9 698.60 -50.3 -47.1 -50.3 -99 -99 SPO 1997 04 19 00 11 50 6.1 -9 698.60 -50.2 -47.2 -50.2 -99 -99 SPO 1997 04 19 00 12 49 6.1 -9 698.60 -50.1 -47.2 -50.1 -99 -99 SPO 1997 04 19 00 13 48 6.1 -9 698.60 -50.0 -47.3 -50.1 63 -99 SPO 1997 04 19 00 14 47 5.9 -9 698.60 -50.0 -47.4 -50.1 64 -99 SPO 1997 04 19 00 15 47 5.7 -9 698.60 -50.0 -47.5 -50.1 63 -99 SPO 1997 04 19 00 16 46 5.5 -9 698.60 -50.0 -47.6 -50.2 62 -99 SPO 1997 04 19 00 17 47 5.5 -9 698.60 -50.0 -47.7 -50.2 62 -99 SPO 1997 04 19 00 18 47 5.2 -9 698.60 -50.1 -47.8 -50.2 62 -99 SPO 1997 04 19 00 19 47 4.9 -9 698.70 -50.1 -47.8 -50.2 63 -99 SPO 1997 04 19 00 20 50 4.8 -9 698.70 -50.2 -47.9 -50.2 64 -99 SPO 1997 04 19 00 21 50 4.7 -9 698.60 -50.1 -48.0 -50.3 64 -99 SPO 1997 04 19 00 22 51 4.5 -9 698.60 -50.2 -48.0 -50.4 64 -99 SPO 1997 04 19 00 23 52 4.5 -9 698.60 -50.3 -48.2 -50.4 65 -99 SPO 1997 04 19 00 24 54 4.5 -9 698.60 -50.4 -48.2 -50.5 65 -99 SPO 1997 04 19 00 25 55 4.7 -9 698.60 -50.4 -48.2 -50.6 65 -99 SPO 1997 04 19 00 26 53 4.6 -9 698.60 -50.6 -48.1 -50.6 66 -99 SPO 1997 04 19 00 27 52 4.7 -9 698.60 -50.6 -48.1 -50.7 65 -99 SPO 1997 04 19 00 28 52 4.6 -9 698.60 -50.6 -48.1 -50.7 65 -99 SPO 1997 04 19 00 29 52 4.8 -9 698.60 -50.6 -48.1 -50.6 64 -99 SPO 1997 04 19 00 30 50 4.8 -9 698.60 -50.6 -48.2 -50.7 64 -99 SPO 1997 04 19 00 31 48 4.7 -9 698.60 -50.7 -48.4 -50.7 64 -99 SPO 1997 04 19 00 32 49 4.9 -9 698.60 -50.7 -48.4 -50.7 64 -99 SPO 1997 04 19 00 33 50 5.0 -9 698.60 -50.6 -48.3 -50.7 65 -99 SPO 1997 04 19 00 34 49 5.2 -9 698.60 -50.6 -48.4 -50.6 65 -99 SPO 1997 04 19 00 35 51 5.5 -9 698.60 -50.6 -48.4 -50.5 66 -99 SPO 1997 04 19 00 36 52 5.4 -9 698.60 -50.6 -48.3 -50.5 66 -99 SPO 1997 04 19 00 37 51 5.3 -9 698.60 -50.5 -48.3 -50.6 65 -99 SPO 1997 04 19 00 38 51 5.4 -9 698.60 -50.5 -48.3 -50.6 65 -99 SPO 1997 04 19 00 39 53 5.5 -9 698.60 -50.5 -48.3 -50.6 64 -99 SPO 1997 04 19 00 40 54 5.5 -9 698.60 -50.5 -48.4 -50.6 64 -99 SPO 1997 04 19 00 41 54 5.5 -9 698.60 -50.5 -48.4 -50.6 64 -99 SPO 1997 04 19 00 42 54 5.4 -9 698.50 -50.6 -48.4 -50.7 64 -99 SPO 1997 04 19 00 43 53 5.3 -9 698.60 -50.6 -48.5 -50.6 64 -99 SPO 1997 04 19 00 44 53 5.3 -9 698.60 -50.6 -48.6 -50.6 64 -99 SPO 1997 04 19 00 45 54 5.2 -9 698.60 -50.6 -48.6 -50.6 64 -99 SPO 1997 04 19 00 46 54 5.2 -9 698.50 -50.6 -48.8 -50.7 65 -99 SPO 1997 04 19 00 47 53 5.0 -9 698.50 -50.6 -48.8 -50.7 64 -99 SPO 1997 04 19 00 48 54 5.0 -9 698.50 -50.6 -48.9 -50.7 65 -99 SPO 1997 04 19 00 49 54 5.1 -9 698.50 -50.6 -49.0 -50.8 65 -99 SPO 1997 04 19 00 50 53 4.9 -9 698.50 -50.7 -49.1 -50.8 66 -99 SPO 1997 04 19 00 51 53 4.9 -9 698.50 -50.7 -49.2 -50.8 64 -99 SPO 1997 04 19 00 52 54 4.7 -9 698.50 -50.7 -49.1 -50.8 64 -99 SPO 1997 04 19 00 53 53 4.7 -9 698.60 -50.7 -49.2 -50.9 63 -99 SPO 1997 04 19 00 54 55 4.7 -9 698.50 -50.8 -49.2 -51.0 63 -99 SPO 1997 04 19 00 55 54 4.7 -9 698.50 -50.9 -49.3 -51.0 63 -99 SPO 1997 04 19 00 56 53 4.8 -9 698.50 -50.9 -49.3 -51.0 63 -99 SPO 1997 04 19 00 57 54 4.5 -9 698.50 -51.0 -49.3 -51.1 64 -99 SPO 1997 04 19 00 58 52 4.6 -9 698.50 -51.0 -49.3 -51.1 65 -99 SPO 1997 04 19 00 59 51 4.8 -9 698.50 -51.0 -49.3 -51.1 65 -99 SPO 1997 04 19 01 00 52 4.6 -9 698.50 -51.1 -49.4 -51.2 64 0 SPO 1997 04 19 01 01 51 4.5 -9 698.40 -51.1 -49.4 -51.2 64 -99 SPO 1997 04 19 01 02 48 4.7 -9 698.40 -51.2 -49.3 -51.2 63 -99 SPO 1997 04 19 01 03 48 4.6 -9 698.40 -51.2 -49.3 -51.3 63 -99 SPO 1997 04 19 01 04 48 4.7 -9 698.40 -51.2 -49.2 -51.2 62 -99 SPO 1997 04 19 01 05 48 4.8 -9 698.40 -51.2 -49.2 -51.2 62 -99 SPO 1997 04 19 01 06 50 4.9 -9 698.40 -51.1 -49.2 -51.1 62 -99 SPO 1997 04 19 01 07 51 4.9 -9 698.30 -51.1 -49.2 -51.1 62 -99 SPO 1997 04 19 01 08 52 5.0 -9 698.30 -51.0 -49.2 -51.0 63 -99 SPO 1997 04 19 01 09 52 5.1 -9 698.30 -50.9 -49.2 -51.0 63 -99 SPO 1997 04 19 01 10 53 5.3 -9 698.30 -50.9 -49.2 -51.0 64 -99 SPO 1997 04 19 01 11 54 5.5 -9 698.30 -50.8 -49.0 -50.9 64 -99 SPO 1997 04 19 01 12 54 5.8 -9 698.20 -50.8 -48.9 -50.9 64 -99 SPO 1997 04 19 01 13 54 5.8 -9 698.20 -50.8 -48.8 -50.8 64 -99 SPO 1997 04 19 01 14 56 6.4 -9 698.20 -50.6 -48.6 -50.6 64 -99 SPO 1997 04 19 01 15 56 7.0 -9 698.20 -50.6 -48.5 -50.7 64 -99 SPO 1997 04 19 01 16 57 7.1 -9 698.20 -50.6 -48.3 -50.6 64 -99 SPO 1997 04 19 01 17 57 7.4 -9 698.20 -50.5 -48.1 -50.6 64 -99 SPO 1997 04 19 01 18 57 7.6 -9 698.10 -50.5 -48.0 -50.6 64 -99 SPO 1997 04 19 01 19 57 7.3 -9 698.10 -50.5 -48.0 -50.6 64 -99 SPO 1997 04 19 01 20 58 7.5 -9 698.10 -50.5 -47.9 -50.6 65 -99 SPO 1997 04 19 01 21 57 7.5 -9 698.10 -50.5 -47.9 -50.5 65 -99 SPO 1997 04 19 01 22 58 7.3 -9 698.10 -50.5 -47.8 -50.6 64 -99 SPO 1997 04 19 01 23 59 7.4 -9 698.10 -50.5 -47.8 -50.7 64 -99 SPO 1997 04 19 01 24 58 7.6 -9 698.10 -50.6 -47.8 -50.7 66 -99 SPO 1997 04 19 01 25 59 7.4 -9 698.10 -50.6 -47.8 -50.8 65 -99 SPO 1997 04 19 01 26 58 7.4 -9 698.10 -50.6 -47.7 -50.7 65 -99 SPO 1997 04 19 01 27 59 7.2 -9 698.10 -50.6 -47.7 -50.8 65 -99 SPO 1997 04 19 01 28 60 7.2 -9 698.10 -50.7 -47.7 -50.8 65 -99 SPO 1997 04 19 01 29 60 7.2 -9 698.10 -50.7 -47.7 -50.8 64 -99 SPO 1997 04 19 01 30 60 7.3 -9 698.00 -50.7 -47.7 -50.8 64 -99 SPO 1997 04 19 01 31 60 7.2 -9 698.10 -50.7 -47.7 -50.8 65 -99 SPO 1997 04 19 01 32 60 7.3 -9 698.10 -50.7 -47.7 -50.7 66 -99 SPO 1997 04 19 01 33 60 7.0 -9 698.00 -50.6 -47.7 -50.7 65 -99 SPO 1997 04 19 01 34 60 7.2 -9 698.00 -50.6 -47.8 -50.7 65 -99 SPO 1997 04 19 01 35 60 7.2 -9 698.00 -50.6 -47.8 -50.7 65 -99 SPO 1997 04 19 01 36 61 7.3 -9 698.00 -50.6 -47.8 -50.6 66 -99 SPO 1997 04 19 01 37 61 7.0 -9 698.00 -50.6 -47.8 -50.6 66 -99 SPO 1997 04 19 01 38 61 7.0 -9 698.00 -50.6 -47.8 -50.7 67 -99 SPO 1997 04 19 01 39 60 7.0 -9 698.00 -50.6 -47.8 -50.7 66 -99 SPO 1997 04 19 01 40 60 7.2 -9 698.00 -50.6 -47.7 -50.7 65 -99 SPO 1997 04 19 01 41 61 7.2 -9 698.00 -50.6 -47.6 -50.6 64 -99 SPO 1997 04 19 01 42 62 7.3 -9 698.00 -50.6 -47.6 -50.6 64 -99 SPO 1997 04 19 01 43 62 7.2 -9 698.00 -50.6 -47.6 -50.7 64 -99 SPO 1997 04 19 01 44 63 7.1 -9 698.00 -50.6 -47.6 -50.8 64 -99 SPO 1997 04 19 01 45 63 7.0 -9 698.00 -50.6 -47.5 -50.8 64 -99 SPO 1997 04 19 01 46 62 7.1 -9 698.00 -50.7 -47.5 -50.8 65 -99 SPO 1997 04 19 01 47 62 7.0 -9 698.00 -50.7 -47.5 -50.8 65 -99 SPO 1997 04 19 01 48 62 7.1 -9 698.00 -50.7 -47.4 -50.8 66 -99 SPO 1997 04 19 01 49 62 6.9 -9 697.90 -50.7 -47.4 -50.8 66 -99 SPO 1997 04 19 01 50 62 6.7 -9 697.90 -50.7 -47.4 -50.8 66 -99 SPO 1997 04 19 01 51 63 6.6 -9 697.90 -50.8 -47.5 -50.9 67 -99 SPO 1997 04 19 01 52 63 6.6 -9 697.90 -50.8 -47.6 -50.9 66 -99 SPO 1997 04 19 01 53 64 6.6 -9 697.90 -50.8 -47.7 -50.9 65 -99 SPO 1997 04 19 01 54 65 6.6 -9 698.00 -50.9 -47.7 -51.0 64 -99 SPO 1997 04 19 01 55 65 6.5 -9 698.00 -50.9 -47.7 -51.0 64 -99 SPO 1997 04 19 01 56 65 6.3 -9 697.90 -50.9 -47.8 -51.0 63 -99 SPO 1997 04 19 01 57 65 6.3 -9 697.90 -50.9 -47.8 -51.0 64 -99 SPO 1997 04 19 01 58 64 6.3 -9 697.90 -50.9 -47.7 -50.9 64 -99 SPO 1997 04 19 01 59 64 6.2 -9 697.90 -50.9 -47.8 -51.0 64 -99 SPO 1997 04 19 02 00 65 6.2 -9 697.90 -50.9 -48.0 -51.0 64 0 SPO 1997 04 19 02 01 66 6.1 -9 697.90 -50.9 -48.1 -51.0 65 -99 SPO 1997 04 19 02 02 67 5.9 -9 697.90 -51.0 -48.1 -51.1 66 -99 SPO 1997 04 19 02 03 66 5.9 -9 697.90 -51.0 -48.1 -51.2 65 -99 SPO 1997 04 19 02 04 65 5.7 -9 697.90 -51.1 -48.2 -51.2 64 -99 SPO 1997 04 19 02 05 64 5.6 -9 697.90 -51.2 -48.2 -51.3 63 -99 SPO 1997 04 19 02 06 64 5.5 -9 697.90 -51.2 -48.2 -51.3 63 -99 SPO 1997 04 19 02 07 63 5.2 -9 697.90 -51.3 -48.3 -51.4 63 -99 SPO 1997 04 19 02 08 62 5.0 -9 697.90 -51.4 -48.4 -51.5 63 -99 SPO 1997 04 19 02 09 62 4.9 -9 698.00 -51.4 -48.5 -51.5 63 -99 SPO 1997 04 19 02 10 62 4.7 -9 698.00 -51.5 -48.6 -51.6 63 -99 SPO 1997 04 19 02 11 63 4.8 -9 698.00 -51.6 -48.6 -51.6 64 -99 SPO 1997 04 19 02 12 63 5.0 -9 698.00 -51.7 -48.6 -51.8 64 -99 SPO 1997 04 19 02 13 61 4.9 -9 698.00 -51.8 -48.3 -51.9 64 -99 SPO 1997 04 19 02 14 60 4.8 -9 698.00 -51.9 -48.1 -52.0 63 -99 SPO 1997 04 19 02 15 60 5.0 -9 697.90 -52.0 -48.1 -52.0 64 -99 SPO 1997 04 19 02 16 58 4.9 -9 697.90 -52.0 -48.2 -52.1 62 -99 SPO 1997 04 19 02 17 59 5.0 -9 697.90 -52.0 -48.2 -52.1 62 -99 SPO 1997 04 19 02 18 59 4.8 -9 698.00 -52.1 -48.2 -52.1 62 -99 SPO 1997 04 19 02 19 59 4.8 -9 697.90 -52.1 -48.3 -52.1 62 -99 SPO 1997 04 19 02 20 58 4.8 -9 697.90 -52.1 -48.4 -52.1 61 -99 SPO 1997 04 19 02 21 58 4.7 -9 697.90 -52.1 -48.4 -52.1 62 -99 SPO 1997 04 19 02 22 59 4.7 -9 697.90 -52.1 -48.4 -52.1 62 -99 SPO 1997 04 19 02 23 61 4.6 -9 698.00 -52.1 -48.4 -52.1 63 -99 SPO 1997 04 19 02 24 63 4.5 -9 698.00 -52.1 -48.4 -52.2 64 -99 SPO 1997 04 19 02 25 67 4.5 -9 698.00 -52.2 -48.3 -52.2 64 -99 SPO 1997 04 19 02 26 69 4.4 -9 698.00 -52.3 -48.4 -52.4 65 -99 SPO 1997 04 19 02 27 72 4.0 -9 698.10 -52.4 -48.6 -52.5 65 -99 SPO 1997 04 19 02 28 76 3.9 -9 698.10 -52.6 -48.8 -52.6 65 -99 SPO 1997 04 19 02 29 79 3.7 -9 698.10 -52.7 -49.0 -52.8 63 -99 SPO 1997 04 19 02 30 79 3.8 -9 698.10 -52.8 -49.2 -53.0 62 -99 SPO 1997 04 19 02 31 81 3.9 -9 698.10 -53.0 -49.3 -53.0 62 -99 SPO 1997 04 19 02 32 81 3.9 -9 698.10 -53.0 -49.4 -53.1 61 -99 SPO 1997 04 19 02 33 80 3.9 -9 698.10 -53.2 -49.2 -53.2 63 -99 SPO 1997 04 19 02 34 81 3.9 -9 698.10 -53.2 -49.2 -53.2 62 -99 SPO 1997 04 19 02 35 80 4.1 -9 698.00 -53.2 -49.3 -53.3 61 -99 SPO 1997 04 19 02 36 80 4.3 -9 698.00 -53.3 -49.3 -53.3 63 -99 SPO 1997 04 19 02 37 79 4.6 -9 698.00 -53.3 -49.2 -53.3 63 -99 SPO 1997 04 19 02 38 77 4.6 -9 698.00 -53.3 -49.1 -53.2 63 -99 SPO 1997 04 19 02 39 77 4.7 -9 698.00 -53.2 -49.0 -53.2 62 -99 SPO 1997 04 19 02 40 76 4.8 -9 698.00 -53.2 -48.9 -53.2 63 -99 SPO 1997 04 19 02 41 76 4.8 -9 698.00 -53.2 -48.9 -53.2 62 -99 SPO 1997 04 19 02 42 77 4.7 -9 697.90 -53.2 -48.8 -53.2 62 -99 SPO 1997 04 19 02 43 76 4.6 -9 698.00 -53.3 -48.9 -53.3 62 -99 SPO 1997 04 19 02 44 77 4.7 -9 697.90 -53.3 -48.8 -53.4 62 -99 SPO 1997 04 19 02 45 76 4.6 -9 697.90 -53.4 -48.8 -53.4 62 -99 SPO 1997 04 19 02 46 74 4.6 -9 697.90 -53.4 -48.8 -53.5 61 -99 SPO 1997 04 19 02 47 74 4.6 -9 697.90 -53.5 -48.9 -53.5 61 -99 SPO 1997 04 19 02 48 73 4.6 -9 697.90 -53.6 -48.9 -53.6 62 -99 SPO 1997 04 19 02 49 72 4.7 -9 697.90 -53.6 -48.7 -53.6 62 -99 SPO 1997 04 19 02 50 70 4.6 -9 697.90 -53.6 -48.7 -53.7 62 -99 SPO 1997 04 19 02 51 69 4.7 -9 697.90 -53.7 -48.6 -53.7 62 -99 SPO 1997 04 19 02 52 69 4.8 -9 697.90 -53.6 -48.6 -53.6 61 -99 SPO 1997 04 19 02 53 69 4.8 -9 697.90 -53.6 -48.7 -53.6 61 -99 SPO 1997 04 19 02 54 69 5.0 -9 697.90 -53.6 -48.7 -53.7 62 -99 SPO 1997 04 19 02 55 68 5.0 -9 697.90 -53.6 -48.7 -53.7 61 -99 SPO 1997 04 19 02 56 68 4.9 -9 697.90 -53.7 -48.7 -53.7 63 -99 SPO 1997 04 19 02 57 66 4.9 -9 697.90 -53.6 -48.7 -53.7 62 -99 SPO 1997 04 19 02 58 67 4.9 -9 697.90 -53.6 -48.7 -53.7 62 -99 SPO 1997 04 19 02 59 67 4.8 -9 697.90 -53.6 -48.7 -53.6 62 -99 SPO 1997 04 19 03 00 67 4.8 -9 697.90 -53.6 -48.7 -53.6 62 0 SPO 1997 04 19 03 01 67 4.9 -9 697.90 -53.5 -48.7 -53.6 61 -99 SPO 1997 04 19 03 02 67 5.0 -9 697.90 -53.5 -48.6 -53.6 61 -99 SPO 1997 04 19 03 03 67 5.0 -9 697.90 -53.5 -48.7 -53.6 61 -99 SPO 1997 04 19 03 04 68 5.0 -9 697.90 -53.5 -48.7 -53.6 61 -99 SPO 1997 04 19 03 05 68 5.0 -9 697.90 -53.5 -48.6 -53.6 61 -99 SPO 1997 04 19 03 06 69 4.9 -9 697.90 -53.6 -48.5 -53.6 62 -99 SPO 1997 04 19 03 07 69 4.9 -9 697.90 -53.6 -48.5 -53.7 62 -99 SPO 1997 04 19 03 08 68 4.8 -9 697.90 -53.6 -48.6 -53.7 62 -99 SPO 1997 04 19 03 09 67 4.8 -9 697.90 -53.7 -48.5 -53.7 63 -99 SPO 1997 04 19 03 10 67 4.8 -9 697.90 -53.7 -48.6 -53.7 63 -99 SPO 1997 04 19 03 11 67 4.8 -9 697.90 -53.7 -48.7 -53.8 62 -99 SPO 1997 04 19 03 12 66 4.9 -9 697.80 -53.7 -48.7 -53.8 62 -99 SPO 1997 04 19 03 13 65 5.0 -9 697.80 -53.7 -48.6 -53.8 61 -99 SPO 1997 04 19 03 14 64 4.9 -9 697.80 -53.7 -48.7 -53.8 61 -99 SPO 1997 04 19 03 15 64 4.8 -9 697.80 -53.8 -48.7 -53.8 61 -99 SPO 1997 04 19 03 16 63 4.8 -9 697.80 -53.8 -48.8 -53.8 62 -99 SPO 1997 04 19 03 17 62 4.7 -9 697.80 -53.8 -48.7 -53.8 62 -99 SPO 1997 04 19 03 18 61 4.5 -9 697.80 -53.7 -48.8 -53.8 62 -99 SPO 1997 04 19 03 19 62 4.5 -9 697.80 -53.7 -48.9 -53.8 63 -99 SPO 1997 04 19 03 20 62 4.5 -9 697.80 -53.7 -49.0 -53.8 63 -99 SPO 1997 04 19 03 21 62 4.6 -9 697.80 -53.7 -49.1 -53.8 63 -99 SPO 1997 04 19 03 22 61 4.6 -9 697.80 -53.7 -49.2 -53.8 63 -99 SPO 1997 04 19 03 23 62 4.5 -9 697.80 -53.7 -49.2 -53.7 62 -99 SPO 1997 04 19 03 24 62 4.5 -9 697.80 -53.7 -49.3 -53.7 62 -99 SPO 1997 04 19 03 25 62 4.5 -9 697.80 -53.7 -49.4 -53.7 62 -99 SPO 1997 04 19 03 26 62 4.5 -9 697.80 -53.7 -49.4 -53.8 61 -99 SPO 1997 04 19 03 27 62 4.5 -9 697.80 -53.6 -49.2 -53.7 61 -99 SPO 1997 04 19 03 28 62 5.0 -9 697.70 -53.7 -49.3 -53.7 62 -99 SPO 1997 04 19 03 29 63 5.0 -9 697.70 -53.6 -49.4 -53.7 62 -99 SPO 1997 04 19 03 30 64 5.1 -9 697.70 -53.6 -49.4 -53.7 62 -99 SPO 1997 04 19 03 31 65 5.2 -9 697.70 -53.6 -49.3 -53.7 63 -99 SPO 1997 04 19 03 32 65 5.3 -9 697.70 -53.6 -49.2 -53.7 64 -99 SPO 1997 04 19 03 33 65 5.3 -9 697.60 -53.7 -49.1 -53.8 63 -99 SPO 1997 04 19 03 34 65 5.2 -9 697.70 -53.7 -49.0 -53.8 62 -99 SPO 1997 04 19 03 35 64 5.1 -9 697.60 -53.7 -49.0 -53.8 61 -99 SPO 1997 04 19 03 36 63 5.1 -9 697.60 -53.7 -49.2 -53.8 61 -99 SPO 1997 04 19 03 37 62 5.1 -9 697.60 -53.7 -49.1 -53.8 61 -99 SPO 1997 04 19 03 38 61 5.2 -9 697.60 -53.7 -49.0 -53.7 61 -99 SPO 1997 04 19 03 39 61 5.3 -9 697.60 -53.6 -48.8 -53.6 61 -99 SPO 1997 04 19 03 40 60 5.2 -9 697.60 -53.5 -48.6 -53.5 61 -99 SPO 1997 04 19 03 41 62 5.3 -9 697.60 -53.4 -48.6 -53.4 61 -99 SPO 1997 04 19 03 42 61 5.3 -9 697.60 -53.2 -48.5 -53.3 61 -99 SPO 1997 04 19 03 43 62 5.3 -9 697.60 -53.2 -48.6 -53.2 61 -99 SPO 1997 04 19 03 44 62 5.3 -9 697.60 -53.1 -48.8 -53.2 61 -99 SPO 1997 04 19 03 45 62 5.1 -9 697.60 -53.0 -48.8 -53.1 61 -99 SPO 1997 04 19 03 46 64 5.2 -9 697.50 -52.9 -48.7 -53.0 61 -99 SPO 1997 04 19 03 47 64 5.3 -9 697.50 -52.9 -48.7 -53.1 61 -99 SPO 1997 04 19 03 48 64 5.3 -9 697.50 -52.9 -48.6 -53.1 61 -99 SPO 1997 04 19 03 49 65 5.5 -9 697.50 -52.9 -48.6 -53.1 61 -99 SPO 1997 04 19 03 50 64 5.5 -9 697.50 -52.9 -48.6 -53.0 62 -99 SPO 1997 04 19 03 51 64 5.4 -9 697.50 -52.9 -48.6 -53.0 62 -99 SPO 1997 04 19 03 52 65 5.6 -9 697.50 -52.8 -48.4 -53.0 61 -99 SPO 1997 04 19 03 53 64 5.2 -9 697.50 -52.8 -48.6 -52.9 62 -99 SPO 1997 04 19 03 54 64 5.3 -9 697.50 -52.8 -49.0 -52.9 62 -99 SPO 1997 04 19 03 55 63 5.2 -9 697.50 -52.8 -49.0 -53.0 62 -99 SPO 1997 04 19 03 56 63 5.5 -9 697.50 -52.8 -48.9 -52.9 63 -99 SPO 1997 04 19 03 57 63 5.6 -9 697.50 -52.7 -48.6 -52.8 63 -99 SPO 1997 04 19 03 58 63 5.7 -9 697.50 -52.7 -48.6 -52.8 63 -99 SPO 1997 04 19 03 59 63 5.9 -9 697.50 -52.7 -48.5 -52.8 64 -99 SPO 1997 04 19 04 00 64 6.2 -9 697.50 -52.6 -48.4 -52.8 62 0 SPO 1997 04 19 04 01 65 6.3 -9 697.50 -52.6 -48.4 -52.8 62 -99 SPO 1997 04 19 04 02 64 6.2 -9 697.50 -52.6 -48.5 -52.8 62 -99 SPO 1997 04 19 04 03 64 6.3 -9 697.50 -52.6 -48.6 -52.8 62 -99 SPO 1997 04 19 04 04 64 6.4 -9 697.40 -52.6 -48.5 -52.7 62 -99 SPO 1997 04 19 04 05 63 6.4 -9 697.40 -52.6 -48.5 -52.7 63 -99 SPO 1997 04 19 04 06 63 6.2 -9 697.40 -52.6 -48.5 -52.8 63 -99 SPO 1997 04 19 04 07 64 6.3 -9 697.40 -52.7 -48.5 -52.8 64 -99 SPO 1997 04 19 04 08 63 6.4 -9 697.40 -52.7 -48.4 -52.8 64 -99 SPO 1997 04 19 04 09 63 6.4 -9 697.40 -52.8 -48.4 -52.9 64 -99 SPO 1997 04 19 04 10 62 6.3 -9 697.40 -52.8 -48.4 -52.9 64 -99 SPO 1997 04 19 04 11 62 6.4 -9 697.40 -52.8 -48.5 -52.9 63 -99 SPO 1997 04 19 04 12 62 6.3 -9 697.40 -52.8 -48.5 -52.9 62 -99 SPO 1997 04 19 04 13 63 6.3 -9 697.40 -52.8 -48.4 -52.9 62 -99 SPO 1997 04 19 04 14 63 6.4 -9 697.30 -52.8 -48.5 -52.9 61 -99 SPO 1997 04 19 04 15 62 6.3 -9 697.30 -52.8 -48.5 -52.9 62 -99 SPO 1997 04 19 04 16 61 6.2 -9 697.30 -52.8 -48.4 -52.8 63 -99 SPO 1997 04 19 04 17 62 6.3 -9 697.30 -52.7 -48.6 -52.8 63 -99 SPO 1997 04 19 04 18 62 6.2 -9 697.30 -52.7 -48.6 -52.7 63 -99 SPO 1997 04 19 04 19 62 6.3 -9 697.30 -52.7 -48.7 -52.8 63 -99 SPO 1997 04 19 04 20 61 6.5 -9 697.20 -52.7 -48.9 -52.8 64 -99 SPO 1997 04 19 04 21 62 6.5 -9 697.20 -52.6 -49.0 -52.7 63 -99 SPO 1997 04 19 04 22 62 6.4 -9 697.20 -52.6 -49.1 -52.7 63 -99 SPO 1997 04 19 04 23 62 6.4 -9 697.20 -52.6 -49.1 -52.7 63 -99 SPO 1997 04 19 04 24 62 6.4 -9 697.20 -52.6 -49.2 -52.6 63 -99 SPO 1997 04 19 04 25 62 6.4 -9 697.20 -52.6 -49.1 -52.7 63 -99 SPO 1997 04 19 04 26 62 6.4 -9 697.20 -52.6 -49.0 -52.6 64 -99 SPO 1997 04 19 04 27 62 6.5 -9 697.20 -52.6 -49.1 -52.7 63 -99 SPO 1997 04 19 04 28 63 6.4 -9 697.20 -52.6 -49.2 -52.7 63 -99 SPO 1997 04 19 04 29 63 6.5 -9 697.20 -52.6 -49.2 -52.7 64 -99 SPO 1997 04 19 04 30 64 6.5 -9 697.20 -52.5 -49.4 -52.7 63 -99 SPO 1997 04 19 04 31 64 6.6 -9 697.20 -52.5 -49.4 -52.7 63 -99 SPO 1997 04 19 04 32 63 6.9 -9 697.20 -52.6 -49.3 -52.7 64 -99 SPO 1997 04 19 04 33 63 6.8 -9 697.20 -52.6 -49.2 -52.7 64 -99 SPO 1997 04 19 04 34 63 7.0 -9 697.20 -52.6 -49.0 -52.6 64 -99 SPO 1997 04 19 04 35 62 7.2 -9 697.20 -52.6 -48.9 -52.6 64 -99 SPO 1997 04 19 04 36 62 7.0 -9 697.20 -52.5 -49.0 -52.6 62 -99 SPO 1997 04 19 04 37 62 7.2 -9 697.20 -52.5 -49.0 -52.5 63 -99 SPO 1997 04 19 04 38 62 7.2 -9 697.20 -52.4 -49.0 -52.5 62 -99 SPO 1997 04 19 04 39 62 7.3 -9 697.10 -52.5 -49.0 -52.5 63 -99 SPO 1997 04 19 04 40 62 7.1 -9 697.10 -52.4 -49.0 -52.5 62 -99 SPO 1997 04 19 04 41 61 7.1 -9 697.10 -52.4 -49.1 -52.5 63 -99 SPO 1997 04 19 04 42 62 7.2 -9 697.10 -52.4 -49.2 -52.5 63 -99 SPO 1997 04 19 04 43 62 7.3 -9 697.10 -52.4 -49.2 -52.5 63 -99 SPO 1997 04 19 04 44 61 7.1 -9 697.10 -52.4 -49.3 -52.5 63 -99 SPO 1997 04 19 04 45 62 6.9 -9 697.10 -52.4 -49.3 -52.5 63 -99 SPO 1997 04 19 04 46 61 7.1 -9 697.10 -52.4 -49.3 -52.5 63 -99 SPO 1997 04 19 04 47 62 7.1 -9 697.10 -52.4 -49.4 -52.5 62 -99 SPO 1997 04 19 04 48 61 7.2 -9 697.10 -52.4 -49.4 -52.5 62 -99 SPO 1997 04 19 04 49 61 7.0 -9 697.00 -52.4 -49.4 -52.5 62 -99 SPO 1997 04 19 04 50 60 7.0 -9 697.10 -52.4 -49.4 -52.6 62 -99 SPO 1997 04 19 04 51 61 6.8 -9 697.10 -52.5 -49.4 -52.5 63 -99 SPO 1997 04 19 04 52 61 7.1 -9 697.10 -52.5 -49.5 -52.5 62 -99 SPO 1997 04 19 04 53 60 6.8 -9 697.00 -52.5 -49.6 -52.6 62 -99 SPO 1997 04 19 04 54 60 6.7 -9 697.10 -52.5 -49.8 -52.6 63 -99 SPO 1997 04 19 04 55 61 6.7 -9 697.00 -52.5 -50.0 -52.6 63 -99 SPO 1997 04 19 04 56 61 6.7 -9 697.10 -52.5 -50.0 -52.6 64 -99 SPO 1997 04 19 04 57 61 6.5 -9 697.10 -52.5 -50.0 -52.6 63 -99 SPO 1997 04 19 04 58 62 6.4 -9 697.10 -52.6 -50.0 -52.7 64 -99 SPO 1997 04 19 04 59 63 6.4 -9 697.10 -52.7 -50.0 -52.8 64 -99 SPO 1997 04 19 05 00 62 6.2 -9 697.10 -52.7 -50.1 -52.8 63 0 SPO 1997 04 19 05 01 63 6.2 -9 697.10 -52.8 -50.1 -52.9 63 -99 SPO 1997 04 19 05 02 62 6.2 -9 697.10 -52.8 -50.1 -52.9 63 -99 SPO 1997 04 19 05 03 61 6.0 -9 697.10 -52.8 -50.2 -52.9 63 -99 SPO 1997 04 19 05 04 62 6.1 -9 697.10 -52.8 -50.4 -53.0 62 -99 SPO 1997 04 19 05 05 62 6.0 -9 697.10 -52.9 -50.4 -53.0 64 -99 SPO 1997 04 19 05 06 61 6.0 -9 697.10 -52.9 -50.5 -53.0 63 -99 SPO 1997 04 19 05 07 61 5.8 -9 697.10 -53.0 -50.4 -53.1 64 -99 SPO 1997 04 19 05 08 63 5.9 -9 697.10 -53.0 -50.5 -53.2 62 -99 SPO 1997 04 19 05 09 64 6.0 -9 697.10 -53.1 -50.5 -53.2 63 -99 SPO 1997 04 19 05 10 63 5.8 -9 697.10 -53.2 -50.6 -53.3 63 -99 SPO 1997 04 19 05 11 63 5.6 -9 697.10 -53.2 -50.6 -53.3 62 -99 SPO 1997 04 19 05 12 62 5.5 -9 697.10 -53.3 -50.7 -53.4 63 -99 SPO 1997 04 19 05 13 61 5.5 -9 697.10 -53.3 -50.6 -53.4 63 -99 SPO 1997 04 19 05 14 62 5.4 -9 697.00 -53.3 -50.6 -53.4 61 -99 SPO 1997 04 19 05 15 63 5.3 -9 697.00 -53.4 -50.6 -53.5 61 -99 SPO 1997 04 19 05 16 65 5.5 -9 697.00 -53.4 -50.6 -53.5 61 -99 SPO 1997 04 19 05 17 65 5.5 -9 697.00 -53.5 -50.7 -53.5 63 -99 SPO 1997 04 19 05 18 65 5.3 -9 697.00 -53.5 -50.7 -53.6 64 -99 SPO 1997 04 19 05 19 65 5.1 -9 697.00 -53.5 -50.7 -53.6 64 -99 SPO 1997 04 19 05 20 64 5.0 -9 697.00 -53.6 -50.8 -53.7 64 -99 SPO 1997 04 19 05 21 64 5.1 -9 697.00 -53.6 -50.9 -53.7 64 -99 SPO 1997 04 19 05 22 65 5.2 -9 697.00 -53.6 -50.8 -53.7 64 -99 SPO 1997 04 19 05 23 64 5.0 -9 697.00 -53.7 -50.9 -53.8 64 -99 SPO 1997 04 19 05 24 65 5.0 -9 697.00 -53.7 -51.0 -53.8 63 -99 SPO 1997 04 19 05 25 65 4.9 -9 697.00 -53.8 -51.0 -53.8 63 -99 SPO 1997 04 19 05 26 65 4.9 -9 697.00 -53.8 -51.0 -53.9 63 -99 SPO 1997 04 19 05 27 66 5.0 -9 697.00 -53.9 -51.0 -54.0 63 -99 SPO 1997 04 19 05 28 65 5.0 -9 697.00 -53.9 -51.1 -54.0 62 -99 SPO 1997 04 19 05 29 62 4.7 -9 697.10 -54.0 -51.2 -54.1 63 -99 SPO 1997 04 19 05 30 61 4.6 -9 697.00 -54.1 -51.3 -54.1 63 -99 SPO 1997 04 19 05 31 63 4.7 -9 697.00 -54.1 -51.3 -54.2 62 -99 SPO 1997 04 19 05 32 62 4.5 -9 697.00 -54.2 -51.3 -54.3 63 -99 SPO 1997 04 19 05 33 64 4.5 -9 697.00 -54.3 -51.3 -54.3 63 -99 SPO 1997 04 19 05 34 65 4.7 -9 697.00 -54.4 -51.2 -54.4 63 -99 SPO 1997 04 19 05 35 67 4.7 -9 697.00 -54.4 -51.2 -54.4 63 -99 SPO 1997 04 19 05 36 67 4.6 -9 697.00 -54.5 -51.2 -54.5 63 -99 SPO 1997 04 19 05 37 67 4.3 -9 697.00 -54.5 -51.2 -54.6 62 -99 SPO 1997 04 19 05 38 67 4.1 -9 697.00 -54.6 -51.2 -54.6 62 -99 SPO 1997 04 19 05 39 67 4.0 -9 697.00 -54.6 -51.2 -54.6 61 -99 SPO 1997 04 19 05 40 69 4.0 -9 697.00 -54.6 -51.1 -54.6 61 -99 SPO 1997 04 19 05 41 66 4.0 -9 697.00 -54.6 -51.1 -54.7 61 -99 SPO 1997 04 19 05 42 67 4.0 -9 697.00 -54.6 -51.1 -54.7 61 -99 SPO 1997 04 19 05 43 66 4.3 -9 697.00 -54.6 -51.0 -54.6 60 -99 SPO 1997 04 19 05 44 64 4.4 -9 697.00 -54.6 -51.0 -54.6 60 -99 SPO 1997 04 19 05 45 65 4.5 -9 697.00 -54.6 -50.8 -54.6 61 -99 SPO 1997 04 19 05 46 65 4.5 -9 697.00 -54.5 -50.8 -54.5 61 -99 SPO 1997 04 19 05 47 65 4.6 -9 697.00 -54.5 -50.8 -54.5 61 -99 SPO 1997 04 19 05 48 66 4.5 -9 697.00 -54.5 -50.8 -54.6 60 -99 SPO 1997 04 19 05 49 65 4.2 -9 697.00 -54.5 -51.0 -54.6 60 -99 SPO 1997 04 19 05 50 64 4.2 -9 697.10 -54.6 -50.9 -54.6 60 -99 SPO 1997 04 19 05 51 65 4.3 -9 697.10 -54.6 -50.8 -54.7 60 -99 SPO 1997 04 19 05 52 66 4.3 -9 697.10 -54.6 -50.8 -54.7 60 -99 SPO 1997 04 19 05 53 66 4.3 -9 697.10 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 05 54 66 4.3 -9 697.10 -54.7 -50.6 -54.8 62 -99 SPO 1997 04 19 05 55 69 4.2 -9 697.10 -54.7 -50.7 -54.8 62 -99 SPO 1997 04 19 05 56 69 4.5 -9 697.10 -54.7 -50.6 -54.8 61 -99 SPO 1997 04 19 05 57 70 4.3 -9 697.00 -54.8 -50.5 -54.8 62 -99 SPO 1997 04 19 05 58 70 4.3 -9 697.10 -54.8 -50.6 -54.9 62 -99 SPO 1997 04 19 05 59 70 4.1 -9 697.10 -54.8 -50.7 -54.9 62 -99 SPO 1997 04 19 06 00 71 4.2 -9 697.10 -54.9 -50.7 -54.9 62 0 SPO 1997 04 19 06 01 72 4.4 -9 697.10 -54.8 -50.7 -54.8 60 -99 SPO 1997 04 19 06 02 69 4.5 -9 697.00 -54.8 -50.8 -54.8 60 -99 SPO 1997 04 19 06 03 69 4.2 -9 697.00 -54.8 -50.8 -54.8 60 -99 SPO 1997 04 19 06 04 70 4.2 -9 697.00 -54.7 -50.9 -54.8 60 -99 SPO 1997 04 19 06 05 73 4.3 -9 697.00 -54.7 -51.0 -54.7 60 -99 SPO 1997 04 19 06 06 74 4.4 -9 697.00 -54.6 -51.0 -54.6 60 -99 SPO 1997 04 19 06 07 74 4.3 -9 697.00 -54.6 -51.0 -54.6 61 -99 SPO 1997 04 19 06 08 74 4.1 -9 697.00 -54.6 -51.1 -54.7 61 -99 SPO 1997 04 19 06 09 74 4.1 -9 697.00 -54.7 -51.0 -54.8 62 -99 SPO 1997 04 19 06 10 74 4.2 -9 697.00 -54.7 -50.9 -54.8 62 -99 SPO 1997 04 19 06 11 76 4.3 -9 697.00 -54.7 -50.9 -54.8 62 -99 SPO 1997 04 19 06 12 75 4.1 -9 697.00 -54.7 -50.9 -54.8 61 -99 SPO 1997 04 19 06 13 73 4.2 -9 697.00 -54.7 -50.8 -54.7 60 -99 SPO 1997 04 19 06 14 72 4.1 -9 697.00 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 06 15 71 4.0 -9 697.00 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 06 16 70 3.7 -9 697.00 -54.6 -50.6 -54.7 59 -99 SPO 1997 04 19 06 17 68 3.4 -9 697.00 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 06 18 68 3.5 -9 697.00 -54.6 -50.7 -54.8 60 -99 SPO 1997 04 19 06 19 66 3.6 -9 697.00 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 06 20 65 3.6 -9 697.00 -54.6 -50.5 -54.7 60 -99 SPO 1997 04 19 06 21 63 3.6 -9 697.00 -54.6 -50.4 -54.7 61 -99 SPO 1997 04 19 06 22 61 3.4 -9 697.00 -54.6 -50.3 -54.7 61 -99 SPO 1997 04 19 06 23 63 3.5 -9 697.00 -54.6 -50.2 -54.7 62 -99 SPO 1997 04 19 06 24 63 3.6 -9 696.90 -54.5 -50.2 -54.6 61 -99 SPO 1997 04 19 06 25 64 3.6 -9 696.90 -54.5 -50.2 -54.6 61 -99 SPO 1997 04 19 06 26 66 3.8 -9 696.90 -54.5 -50.2 -54.5 61 -99 SPO 1997 04 19 06 27 65 4.2 -9 696.90 -54.4 -50.1 -54.5 61 -99 SPO 1997 04 19 06 28 65 4.3 -9 696.90 -54.3 -50.0 -54.4 60 -99 SPO 1997 04 19 06 29 65 4.3 -9 696.90 -54.2 -49.9 -54.2 60 -99 SPO 1997 04 19 06 30 66 4.3 -9 696.90 -54.2 -49.9 -54.3 61 -99 SPO 1997 04 19 06 31 67 4.6 -9 696.90 -54.1 -49.9 -54.3 60 -99 SPO 1997 04 19 06 32 69 4.6 -9 696.80 -54.1 -49.9 -54.2 61 -99 SPO 1997 04 19 06 33 72 4.7 -9 696.80 -54.1 -50.0 -54.1 62 -99 SPO 1997 04 19 06 34 73 4.7 -9 696.80 -54.1 -50.1 -54.1 63 -99 SPO 1997 04 19 06 35 73 4.8 -9 696.80 -54.1 -50.1 -54.2 62 -99 SPO 1997 04 19 06 36 74 4.8 -9 696.80 -54.0 -50.0 -54.1 61 -99 SPO 1997 04 19 06 37 74 4.8 -9 696.80 -54.0 -50.1 -54.1 60 -99 SPO 1997 04 19 06 38 78 4.8 -9 696.80 -54.1 -50.2 -54.2 60 -99 SPO 1997 04 19 06 39 81 4.8 -9 696.80 -54.2 -50.2 -54.4 61 -99 SPO 1997 04 19 06 40 83 4.7 -9 696.80 -54.3 -50.2 -54.5 61 -99 SPO 1997 04 19 06 41 83 4.8 -9 696.80 -54.4 -50.2 -54.5 61 -99 SPO 1997 04 19 06 42 83 4.6 -9 696.80 -54.4 -50.2 -54.3 61 -99 SPO 1997 04 19 06 43 86 4.6 -9 696.80 -54.3 -50.3 -54.2 60 -99 SPO 1997 04 19 06 44 85 4.3 -9 696.80 -54.2 -50.4 -54.3 61 -99 SPO 1997 04 19 06 45 85 4.3 -9 696.80 -54.2 -50.4 -54.3 61 -99 SPO 1997 04 19 06 46 86 4.2 -9 696.80 -54.4 -50.4 -54.5 63 -99 SPO 1997 04 19 06 47 83 4.3 -9 696.80 -54.6 -50.4 -54.7 63 -99 SPO 1997 04 19 06 48 82 4.3 -9 696.80 -54.7 -50.2 -54.8 62 -99 SPO 1997 04 19 06 49 80 4.0 -9 696.80 -54.7 -50.3 -54.8 61 -99 SPO 1997 04 19 06 50 80 4.0 -9 696.80 -54.8 -50.3 -54.8 61 -99 SPO 1997 04 19 06 51 79 4.2 -9 696.80 -54.9 -50.2 -55.0 61 -99 SPO 1997 04 19 06 52 82 4.2 -9 696.80 -55.0 -50.2 -55.2 61 -99 SPO 1997 04 19 06 53 82 4.3 -9 696.80 -55.2 -50.3 -55.4 61 -99 SPO 1997 04 19 06 54 81 4.4 -9 696.80 -55.5 -50.4 -55.6 62 -99 SPO 1997 04 19 06 55 82 4.4 -9 696.80 -55.6 -50.4 -55.6 62 -99 SPO 1997 04 19 06 56 85 4.5 -9 696.80 -55.7 -50.3 -55.7 62 -99 SPO 1997 04 19 06 57 86 4.4 -9 696.80 -55.8 -50.3 -55.7 62 -99 SPO 1997 04 19 06 58 91 4.4 -9 696.80 -55.8 -50.4 -55.8 61 -99 SPO 1997 04 19 06 59 96 4.4 -9 696.80 -55.9 -50.4 -55.8 61 -99 SPO 1997 04 19 07 00 100 4.2 -9 696.80 -55.9 -50.5 -55.9 62 0 SPO 1997 04 19 07 01 103 4.1 -9 696.80 -56.0 -50.5 -56.1 62 -99 SPO 1997 04 19 07 02 105 4.4 -9 696.80 -56.2 -50.4 -56.2 62 -99 SPO 1997 04 19 07 03 106 4.7 -9 696.80 -56.2 -50.4 -56.3 61 -99 SPO 1997 04 19 07 04 109 4.9 -9 696.80 -56.2 -50.5 -56.3 60 -99 SPO 1997 04 19 07 05 110 5.1 -9 696.90 -56.2 -50.6 -56.2 60 -99 SPO 1997 04 19 07 06 110 5.2 -9 696.80 -56.2 -50.6 -56.1 61 -99 SPO 1997 04 19 07 07 107 5.3 -9 696.80 -56.1 -50.5 -56.0 60 -99 SPO 1997 04 19 07 08 107 5.1 -9 696.80 -56.0 -50.4 -56.0 60 -99 SPO 1997 04 19 07 09 106 5.1 -9 696.80 -56.0 -50.4 -56.0 60 -99 SPO 1997 04 19 07 10 103 5.3 -9 696.80 -56.0 -50.4 -56.0 60 -99 SPO 1997 04 19 07 11 101 5.3 -9 696.80 -55.9 -50.4 -55.9 60 -99 SPO 1997 04 19 07 12 99 5.2 -9 696.80 -55.8 -50.3 -55.8 61 -99 SPO 1997 04 19 07 13 97 5.2 -9 696.80 -55.7 -50.3 -55.7 60 -99 SPO 1997 04 19 07 14 96 5.1 -9 696.70 -55.6 -50.3 -55.6 59 -99 SPO 1997 04 19 07 15 94 5.2 -9 696.70 -55.6 -50.2 -55.6 59 -99 SPO 1997 04 19 07 16 95 5.2 -9 696.70 -55.4 -50.1 -55.4 58 -99 SPO 1997 04 19 07 17 96 5.2 -9 696.70 -55.4 -50.2 -55.5 59 -99 SPO 1997 04 19 07 18 96 5.2 -9 696.60 -55.4 -50.3 -55.5 59 -99 SPO 1997 04 19 07 19 97 5.0 -9 696.60 -55.4 -50.2 -55.5 59 -99 SPO 1997 04 19 07 20 98 4.9 -9 696.70 -55.4 -50.2 -55.5 60 -99 SPO 1997 04 19 07 21 98 4.8 -9 696.60 -55.4 -50.3 -55.5 61 -99 SPO 1997 04 19 07 22 98 4.9 -9 696.60 -55.4 -50.4 -55.6 61 -99 SPO 1997 04 19 07 23 97 4.8 -9 696.60 -55.4 -50.4 -55.6 60 -99 SPO 1997 04 19 07 24 99 4.9 -9 696.60 -55.4 -50.3 -55.5 61 -99 SPO 1997 04 19 07 25 98 4.9 -9 696.60 -55.4 -50.3 -55.5 59 -99 SPO 1997 04 19 07 26 97 4.9 -9 696.60 -55.4 -50.4 -55.6 59 -99 SPO 1997 04 19 07 27 94 4.9 -9 696.60 -55.4 -50.5 -55.5 59 -99 SPO 1997 04 19 07 28 92 5.0 -9 696.60 -55.4 -50.4 -55.5 59 -99 SPO 1997 04 19 07 29 93 5.1 -9 696.50 -55.4 -50.4 -55.4 59 -99 SPO 1997 04 19 07 30 95 5.0 -9 696.50 -55.3 -50.5 -55.4 60 -99 SPO 1997 04 19 07 31 96 5.1 -9 696.50 -55.4 -50.6 -55.5 61 -99 SPO 1997 04 19 07 32 96 5.1 -9 696.50 -55.5 -50.6 -55.6 62 -99 SPO 1997 04 19 07 33 96 5.2 -9 696.50 -55.6 -50.5 -55.7 62 -99 SPO 1997 04 19 07 34 94 5.3 -9 696.50 -55.6 -50.4 -55.7 62 -99 SPO 1997 04 19 07 35 92 5.4 -9 696.50 -55.6 -50.4 -55.5 62 -99 SPO 1997 04 19 07 36 90 5.3 -9 696.50 -55.4 -50.3 -55.4 61 -99 SPO 1997 04 19 07 37 88 5.5 -9 696.40 -55.4 -50.3 -55.4 61 -99 SPO 1997 04 19 07 38 86 5.4 -9 696.40 -55.3 -50.3 -55.3 60 -99 SPO 1997 04 19 07 39 84 5.3 -9 696.40 -55.3 -50.2 -55.4 60 -99 SPO 1997 04 19 07 40 84 5.2 -9 696.40 -55.3 -50.1 -55.4 59 -99 SPO 1997 04 19 07 41 83 5.1 -9 696.40 -55.4 -50.1 -55.6 59 -99 SPO 1997 04 19 07 42 82 5.1 -9 696.40 -55.6 -50.0 -55.7 61 -99 SPO 1997 04 19 07 43 80 5.3 -9 696.40 -55.6 -50.0 -55.8 61 -99 SPO 1997 04 19 07 44 79 5.5 -9 696.40 -55.7 -50.0 -55.8 61 -99 SPO 1997 04 19 07 45 77 5.7 -9 696.30 -55.7 -50.0 -55.7 61 -99 SPO 1997 04 19 07 46 76 5.9 -9 696.30 -55.6 -50.0 -55.6 61 -99 SPO 1997 04 19 07 47 74 5.7 -9 696.30 -55.6 -50.0 -55.5 61 -99 SPO 1997 04 19 07 48 71 5.3 -9 696.40 -55.4 -50.0 -55.4 60 -99 SPO 1997 04 19 07 49 71 5.1 -9 696.40 -55.4 -50.1 -55.4 60 -99 SPO 1997 04 19 07 50 71 5.0 -9 696.40 -55.2 -50.1 -55.3 59 -99 SPO 1997 04 19 07 51 72 5.1 -9 696.40 -55.2 -50.1 -55.2 60 -99 SPO 1997 04 19 07 52 71 5.1 -9 696.40 -55.1 -50.1 -55.2 60 -99 SPO 1997 04 19 07 53 70 5.3 -9 696.40 -55.0 -50.0 -55.0 61 -99 SPO 1997 04 19 07 54 71 5.5 -9 696.40 -54.8 -49.9 -54.9 60 -99 SPO 1997 04 19 07 55 72 5.7 -9 696.40 -54.6 -49.8 -54.8 60 -99 SPO 1997 04 19 07 56 71 5.7 -9 696.30 -54.6 -49.8 -54.6 61 -99 SPO 1997 04 19 07 57 70 5.7 -9 696.30 -54.4 -49.7 -54.6 60 -99 SPO 1997 04 19 07 58 69 5.7 -9 696.30 -54.4 -49.7 -54.5 61 -99 SPO 1997 04 19 07 59 70 5.7 -9 696.30 -54.3 -49.5 -54.5 60 -99 SPO 1997 04 19 08 00 70 5.8 -9 696.30 -54.3 -49.5 -54.4 61 0 SPO 1997 04 19 08 01 68 5.5 -9 696.30 -54.2 -49.5 -54.4 60 -99 SPO 1997 04 19 08 02 66 5.3 -9 696.40 -54.2 -49.6 -54.3 60 -99 SPO 1997 04 19 08 03 65 4.9 -9 696.30 -54.1 -49.6 -54.3 60 -99 SPO 1997 04 19 08 04 64 4.5 -9 696.40 -54.1 -49.6 -54.3 60 -99 SPO 1997 04 19 08 05 65 4.4 -9 696.40 -54.2 -49.6 -54.3 61 -99 SPO 1997 04 19 08 06 67 4.7 -9 696.40 -54.2 -49.5 -54.4 62 -99 SPO 1997 04 19 08 07 68 5.3 -9 696.40 -54.2 -49.4 -54.4 63 -99 SPO 1997 04 19 08 08 68 4.9 -9 696.40 -54.1 -49.4 -54.3 62 -99 SPO 1997 04 19 08 09 70 5.2 -9 696.30 -54.1 -49.4 -54.3 62 -99 SPO 1997 04 19 08 10 69 5.2 -9 696.40 -54.2 -49.4 -54.4 63 -99 SPO 1997 04 19 08 11 72 5.2 -9 696.40 -54.3 -49.4 -54.4 63 -99 SPO 1997 04 19 08 12 73 5.4 -9 696.40 -54.3 -49.5 -54.4 63 -99 SPO 1997 04 19 08 13 74 5.8 -9 696.30 -54.3 -49.4 -54.5 62 -99 SPO 1997 04 19 08 14 73 5.6 -9 696.30 -54.4 -49.4 -54.5 63 -99 SPO 1997 04 19 08 15 72 5.4 -9 696.30 -54.4 -49.5 -54.5 62 -99 SPO 1997 04 19 08 16 73 5.4 -9 696.30 -54.4 -49.4 -54.5 61 -99 SPO 1997 04 19 08 17 70 5.1 -9 696.40 -54.5 -49.4 -54.6 61 -99 SPO 1997 04 19 08 18 69 4.8 -9 696.40 -54.5 -49.5 -54.6 61 -99 SPO 1997 04 19 08 19 69 5.2 -9 696.40 -54.5 -49.5 -54.6 61 -99 SPO 1997 04 19 08 20 70 5.3 -9 696.30 -54.5 -49.5 -54.6 62 -99 SPO 1997 04 19 08 21 70 5.2 -9 696.40 -54.6 -49.6 -54.7 63 -99 SPO 1997 04 19 08 22 72 5.1 -9 696.40 -54.7 -49.6 -54.8 62 -99 SPO 1997 04 19 08 23 74 4.8 -9 696.40 -54.8 -49.8 -55.0 62 -99 SPO 1997 04 19 08 24 77 4.8 -9 696.40 -55.0 -50.0 -55.1 64 -99 SPO 1997 04 19 08 25 78 4.6 -9 696.40 -55.1 -50.0 -55.2 62 -99 SPO 1997 04 19 08 26 77 4.0 -9 696.50 -55.2 -50.1 -55.3 62 -99 SPO 1997 04 19 08 27 80 4.2 -9 696.40 -55.3 -50.1 -55.3 62 -99 SPO 1997 04 19 08 28 83 4.5 -9 696.40 -55.4 -50.1 -55.4 61 -99 SPO 1997 04 19 08 29 83 4.7 -9 696.40 -55.4 -50.1 -55.4 61 -99 SPO 1997 04 19 08 30 83 4.3 -9 696.40 -55.4 -50.2 -55.5 62 -99 SPO 1997 04 19 08 31 80 4.2 -9 696.40 -55.5 -50.2 -55.6 62 -99 SPO 1997 04 19 08 32 82 4.0 -9 696.40 -55.6 -50.2 -55.6 62 -99 SPO 1997 04 19 08 33 84 4.3 -9 696.40 -55.7 -50.3 -55.7 63 -99 SPO 1997 04 19 08 34 83 4.3 -9 696.40 -55.8 -50.4 -55.8 62 -99 SPO 1997 04 19 08 35 82 4.7 -9 696.40 -56.0 -50.3 -56.0 62 -99 SPO 1997 04 19 08 36 80 4.7 -9 696.40 -56.1 -50.4 -56.1 62 -99 SPO 1997 04 19 08 37 79 5.1 -9 696.40 -56.1 -50.4 -56.0 61 -99 SPO 1997 04 19 08 38 78 5.4 -9 696.40 -56.0 -50.3 -55.9 61 -99 SPO 1997 04 19 08 39 76 5.6 -9 696.40 -55.9 -50.3 -55.7 61 -99 SPO 1997 04 19 08 40 76 5.9 -9 696.40 -55.7 -50.2 -55.6 60 -99 SPO 1997 04 19 08 41 76 6.2 -9 696.30 -55.6 -50.2 -55.4 60 -99 SPO 1997 04 19 08 42 75 6.2 -9 696.30 -55.4 -50.2 -55.2 60 -99 SPO 1997 04 19 08 43 73 6.2 -9 696.30 -55.2 -50.1 -55.1 60 -99 SPO 1997 04 19 08 44 74 6.4 -9 696.20 -55.1 -50.0 -55.0 61 -99 SPO 1997 04 19 08 45 74 6.3 -9 696.20 -55.0 -50.0 -55.0 61 -99 SPO 1997 04 19 08 46 72 6.1 -9 696.30 -55.0 -50.1 -55.0 62 -99 SPO 1997 04 19 08 47 72 6.2 -9 696.20 -55.0 -50.1 -55.0 62 -99 SPO 1997 04 19 08 48 72 6.3 -9 696.20 -54.9 -50.1 -54.8 62 -99 SPO 1997 04 19 08 49 73 6.4 -9 696.20 -54.8 -50.0 -54.8 61 -99 SPO 1997 04 19 08 50 72 6.2 -9 696.10 -54.8 -49.9 -54.8 60 -99 SPO 1997 04 19 08 51 72 6.1 -9 696.20 -54.7 -50.1 -54.8 60 -99 SPO 1997 04 19 08 52 73 6.3 -9 696.10 -54.6 -50.0 -54.7 60 -99 SPO 1997 04 19 08 53 71 6.1 -9 696.20 -54.6 -50.0 -54.6 61 -99 SPO 1997 04 19 08 54 72 6.1 -9 696.20 -54.5 -50.0 -54.6 60 -99 SPO 1997 04 19 08 55 72 6.2 -9 696.20 -54.6 -50.1 -54.7 61 -99 SPO 1997 04 19 08 56 74 6.2 -9 696.20 -54.6 -50.2 -54.7 61 -99 SPO 1997 04 19 08 57 74 6.1 -9 696.20 -54.7 -50.2 -54.8 62 -99 SPO 1997 04 19 08 58 76 6.1 -9 696.20 -54.7 -50.2 -54.9 62 -99 SPO 1997 04 19 08 59 78 5.9 -9 696.10 -54.8 -50.3 -55.0 62 -99 SPO 1997 04 19 09 00 78 5.8 -9 696.20 -55.0 -50.3 -55.1 64 0 SPO 1997 04 19 09 01 79 5.7 -9 696.20 -55.1 -50.3 -55.2 64 -99 SPO 1997 04 19 09 02 80 5.3 -9 696.20 -55.2 -50.3 -55.3 63 -99 SPO 1997 04 19 09 03 79 5.5 -9 696.20 -55.3 -50.3 -55.4 62 -99 SPO 1997 04 19 09 04 80 5.3 -9 696.30 -55.3 -50.2 -55.4 62 -99 SPO 1997 04 19 09 05 80 5.3 -9 696.30 -55.4 -50.1 -55.4 62 -99 SPO 1997 04 19 09 06 82 5.4 -9 696.20 -55.3 -50.2 -55.4 62 -99 SPO 1997 04 19 09 07 82 5.5 -9 696.20 -55.3 -50.2 -55.4 62 -99 SPO 1997 04 19 09 08 80 5.7 -9 696.20 -55.4 -50.0 -55.4 62 -99 SPO 1997 04 19 09 09 78 5.7 -9 696.20 -55.4 -50.0 -55.4 62 -99 SPO 1997 04 19 09 10 78 5.7 -9 696.20 -55.3 -50.0 -55.3 61 -99 SPO 1997 04 19 09 11 76 5.7 -9 696.20 -55.2 -50.0 -55.1 61 -99 SPO 1997 04 19 09 12 73 5.6 -9 696.20 -55.0 -50.2 -55.0 61 -99 SPO 1997 04 19 09 13 74 5.6 -9 696.20 -54.9 -50.2 -54.9 61 -99 SPO 1997 04 19 09 14 73 5.8 -9 696.20 -54.9 -50.0 -55.0 61 -99 SPO 1997 04 19 09 15 72 5.9 -9 696.20 -54.9 -49.9 -55.0 61 -99 SPO 1997 04 19 09 16 73 6.0 -9 696.10 -54.9 -49.9 -54.9 60 -99 SPO 1997 04 19 09 17 72 6.2 -9 696.10 -54.8 -50.0 -54.9 60 -99 SPO 1997 04 19 09 18 70 6.2 -9 696.10 -54.8 -50.0 -54.8 61 -99 SPO 1997 04 19 09 19 70 6.3 -9 696.10 -54.8 -50.0 -54.8 62 -99 SPO 1997 04 19 09 20 70 6.3 -9 696.10 -54.8 -49.9 -54.9 62 -99 SPO 1997 04 19 09 21 69 6.5 -9 696.10 -54.9 -49.8 -55.0 62 -99 SPO 1997 04 19 09 22 69 6.6 -9 696.00 -54.8 -49.7 -54.9 62 -99 SPO 1997 04 19 09 23 69 6.6 -9 696.00 -54.8 -49.7 -54.8 62 -99 SPO 1997 04 19 09 24 70 6.8 -9 696.00 -54.8 -49.6 -54.8 62 -99 SPO 1997 04 19 09 25 70 6.5 -9 696.00 -54.7 -49.7 -54.8 62 -99 SPO 1997 04 19 09 26 69 6.3 -9 696.00 -54.7 -49.8 -54.7 62 -99 SPO 1997 04 19 09 27 70 6.5 -9 696.00 -54.6 -49.7 -54.7 61 -99 SPO 1997 04 19 09 28 69 6.4 -9 696.00 -54.6 -49.7 -54.7 61 -99 SPO 1997 04 19 09 29 70 6.4 -9 696.00 -54.6 -49.8 -54.6 62 -99 SPO 1997 04 19 09 30 70 6.2 -9 696.00 -54.5 -49.8 -54.6 62 -99 SPO 1997 04 19 09 31 70 6.0 -9 696.00 -54.5 -49.8 -54.6 62 -99 SPO 1997 04 19 09 32 71 6.3 -9 696.00 -54.5 -49.9 -54.6 62 -99 SPO 1997 04 19 09 33 69 6.2 -9 696.00 -54.5 -49.9 -54.5 62 -99 SPO 1997 04 19 09 34 70 6.1 -9 696.00 -54.4 -49.9 -54.5 62 -99 SPO 1997 04 19 09 35 70 6.1 -9 696.00 -54.4 -49.8 -54.5 63 -99 SPO 1997 04 19 09 36 71 6.1 -9 696.00 -54.4 -49.8 -54.4 63 -99 SPO 1997 04 19 09 37 71 6.2 -9 696.00 -54.3 -49.8 -54.5 62 -99 SPO 1997 04 19 09 38 70 5.9 -9 696.00 -54.4 -49.9 -54.5 62 -99 SPO 1997 04 19 09 39 67 5.9 -9 696.00 -54.4 -49.9 -54.4 62 -99 SPO 1997 04 19 09 40 65 5.5 -9 696.00 -54.3 -49.9 -54.4 60 -99 SPO 1997 04 19 09 41 65 5.6 -9 696.00 -54.2 -49.9 -54.3 60 -99 SPO 1997 04 19 09 42 62 5.3 -9 696.00 -54.2 -50.1 -54.3 61 -99 SPO 1997 04 19 09 43 62 5.5 -9 696.00 -54.2 -50.1 -54.2 61 -99 SPO 1997 04 19 09 44 62 5.3 -9 696.00 -54.1 -50.1 -54.2 62 -99 SPO 1997 04 19 09 45 62 5.2 -9 696.00 -54.0 -50.2 -54.1 63 -99 SPO 1997 04 19 09 46 63 5.3 -9 696.00 -54.0 -50.2 -54.0 63 -99 SPO 1997 04 19 09 47 64 5.5 -9 696.00 -53.9 -50.3 -54.0 63 -99 SPO 1997 04 19 09 48 63 5.6 -9 696.00 -53.8 -50.2 -53.9 63 -99 SPO 1997 04 19 09 49 61 5.5 -9 696.00 -53.7 -50.2 -53.8 63 -99 SPO 1997 04 19 09 50 61 5.4 -9 696.00 -53.6 -50.2 -53.6 62 -99 SPO 1997 04 19 09 51 62 5.5 -9 696.00 -53.4 -50.2 -53.5 61 -99 SPO 1997 04 19 09 52 63 5.3 -9 696.00 -53.4 -50.3 -53.5 61 -99 SPO 1997 04 19 09 53 64 5.1 -9 696.00 -53.3 -50.3 -53.5 61 -99 SPO 1997 04 19 09 54 64 5.0 -9 696.00 -53.4 -50.4 -53.6 62 -99 SPO 1997 04 19 09 55 64 5.1 -9 696.00 -53.5 -50.3 -53.7 64 -99 SPO 1997 04 19 09 56 65 4.9 -9 696.00 -53.6 -50.4 -53.8 64 -99 SPO 1997 04 19 09 57 65 4.8 -9 696.00 -53.7 -50.4 -53.8 64 -99 SPO 1997 04 19 09 58 66 4.2 -9 696.00 -53.7 -50.6 -53.9 64 -99 SPO 1997 04 19 09 59 66 4.2 -9 696.10 -53.8 -50.8 -54.0 64 -99 SPO 1997 04 19 10 00 67 4.2 -9 696.10 -54.0 -50.8 -54.2 64 0 SPO 1997 04 19 10 01 67 4.3 -9 696.00 -54.2 -50.7 -54.3 63 -99 SPO 1997 04 19 10 02 66 4.3 -9 696.00 -54.3 -50.6 -54.4 62 -99 SPO 1997 04 19 10 03 67 4.4 -9 696.10 -54.4 -50.5 -54.5 61 -99 SPO 1997 04 19 10 04 67 4.5 -9 696.10 -54.6 -50.5 -54.6 62 -99 SPO 1997 04 19 10 05 67 4.9 -9 696.10 -54.6 -50.3 -54.6 61 -99 SPO 1997 04 19 10 06 66 4.9 -9 696.00 -54.6 -50.2 -54.6 62 -99 SPO 1997 04 19 10 07 66 5.0 -9 696.00 -54.6 -50.4 -54.6 61 -99 SPO 1997 04 19 10 08 65 5.2 -9 696.10 -54.6 -50.3 -54.6 62 -99 SPO 1997 04 19 10 09 65 5.2 -9 696.00 -54.5 -50.4 -54.5 62 -99 SPO 1997 04 19 10 10 65 5.3 -9 696.10 -54.4 -50.4 -54.4 63 -99 SPO 1997 04 19 10 11 66 5.5 -9 696.10 -54.4 -50.4 -54.3 63 -99 SPO 1997 04 19 10 12 65 5.5 -9 696.00 -54.3 -50.3 -54.3 63 -99 SPO 1997 04 19 10 13 64 5.6 -9 696.00 -54.3 -50.3 -54.3 62 -99 SPO 1997 04 19 10 14 63 5.7 -9 696.00 -54.3 -50.2 -54.3 60 -99 SPO 1997 04 19 10 15 63 5.8 -9 696.10 -54.2 -50.1 -54.3 60 -99 SPO 1997 04 19 10 16 63 6.0 -9 696.00 -54.2 -49.9 -54.3 60 -99 SPO 1997 04 19 10 17 64 6.0 -9 696.00 -54.2 -50.0 -54.3 61 -99 SPO 1997 04 19 10 18 63 6.2 -9 696.00 -54.2 -50.0 -54.3 62 -99 SPO 1997 04 19 10 19 64 6.4 -9 696.00 -54.2 -49.9 -54.3 62 -99 SPO 1997 04 19 10 20 65 6.5 -9 696.00 -54.2 -49.9 -54.3 63 -99 SPO 1997 04 19 10 21 67 6.6 -9 695.90 -54.2 -49.9 -54.2 63 -99 SPO 1997 04 19 10 22 67 6.5 -9 695.90 -54.2 -49.9 -54.2 63 -99 SPO 1997 04 19 10 23 67 6.5 -9 695.90 -54.1 -49.9 -54.2 62 -99 SPO 1997 04 19 10 24 68 6.3 -9 696.00 -54.0 -49.9 -54.1 61 -99 SPO 1997 04 19 10 25 67 6.2 -9 696.00 -54.0 -49.9 -54.0 61 -99 SPO 1997 04 19 10 26 65 5.8 -9 696.00 -54.0 -49.9 -54.0 61 -99 SPO 1997 04 19 10 27 65 5.9 -9 696.00 -53.9 -50.0 -54.1 60 -99 SPO 1997 04 19 10 28 64 5.5 -9 696.00 -54.0 -50.1 -54.1 60 -99 SPO 1997 04 19 10 29 66 5.3 -9 696.00 -54.0 -50.2 -54.2 61 -99 SPO 1997 04 19 10 30 67 5.4 -9 696.00 -54.1 -50.1 -54.2 63 -99 SPO 1997 04 19 10 31 67 5.6 -9 696.00 -54.2 -50.0 -54.3 63 -99 SPO 1997 04 19 10 32 69 5.7 -9 696.00 -54.2 -50.0 -54.3 63 -99 SPO 1997 04 19 10 33 68 5.5 -9 696.00 -54.3 -50.1 -54.4 63 -99 SPO 1997 04 19 10 34 66 5.3 -9 696.00 -54.3 -50.2 -54.4 63 -99 SPO 1997 04 19 10 35 66 5.2 -9 696.00 -54.4 -50.3 -54.5 63 -99 SPO 1997 04 19 10 36 66 5.1 -9 696.00 -54.5 -50.3 -54.5 63 -99 SPO 1997 04 19 10 37 64 4.8 -9 696.00 -54.6 -50.5 -54.6 63 -99 SPO 1997 04 19 10 38 65 4.9 -9 696.00 -54.6 -50.5 -54.6 62 -99 SPO 1997 04 19 10 39 67 5.2 -9 696.00 -54.6 -50.5 -54.6 62 -99 SPO 1997 04 19 10 40 66 5.2 -9 696.00 -54.6 -50.4 -54.6 61 -99 SPO 1997 04 19 10 41 67 5.6 -9 696.00 -54.6 -50.3 -54.6 61 -99 SPO 1997 04 19 10 42 66 5.8 -9 696.00 -54.5 -50.2 -54.5 61 -99 SPO 1997 04 19 10 43 67 6.2 -9 696.00 -54.5 -50.1 -54.5 62 -99 SPO 1997 04 19 10 44 68 6.6 -9 695.90 -54.4 -49.8 -54.4 62 -99 SPO 1997 04 19 10 45 67 6.9 -9 695.80 -54.4 -49.7 -54.3 62 -99 SPO 1997 04 19 10 46 67 6.9 -9 695.90 -54.3 -49.7 -54.2 62 -99 SPO 1997 04 19 10 47 67 6.8 -9 695.80 -54.2 -49.8 -54.2 62 -99 SPO 1997 04 19 10 48 66 6.4 -9 695.90 -54.1 -50.0 -54.2 61 -99 SPO 1997 04 19 10 49 67 6.1 -9 695.90 -54.1 -50.1 -54.2 62 -99 SPO 1997 04 19 10 50 64 5.6 -9 696.00 -54.1 -50.4 -54.2 62 -99 SPO 1997 04 19 10 51 65 5.3 -9 696.00 -54.1 -50.4 -54.2 61 -99 SPO 1997 04 19 10 52 65 4.8 -9 696.00 -54.1 -50.6 -54.2 61 -99 SPO 1997 04 19 10 53 63 4.1 -9 696.00 -54.0 -50.6 -54.2 61 -99 SPO 1997 04 19 10 54 65 4.4 -9 696.00 -54.1 -50.8 -54.3 62 -99 SPO 1997 04 19 10 55 61 4.8 -9 696.00 -54.2 -50.7 -54.3 63 -99 SPO 1997 04 19 10 56 60 4.5 -9 696.00 -54.0 -50.6 -54.0 63 -99 SPO 1997 04 19 10 57 61 4.3 -9 696.00 -53.9 -50.6 -54.0 63 -99 SPO 1997 04 19 10 58 62 4.0 -9 696.00 -53.9 -50.8 -54.0 63 -99 SPO 1997 04 19 10 59 64 3.6 -9 696.00 -53.9 -50.9 -54.0 63 -99 SPO 1997 04 19 11 00 64 3.3 -9 696.00 -53.9 -50.9 -54.1 62 0 SPO 1997 04 19 11 01 65 3.2 -9 696.00 -54.0 -51.0 -54.2 61 -99 SPO 1997 04 19 11 02 71 3.5 -9 696.00 -54.0 -50.9 -54.2 61 -99 SPO 1997 04 19 11 03 73 3.8 -9 696.00 -54.1 -50.9 -54.2 61 -99 SPO 1997 04 19 11 04 72 3.7 -9 696.00 -54.1 -50.8 -54.2 61 -99 SPO 1997 04 19 11 05 72 3.5 -9 696.00 -54.1 -50.8 -54.2 61 -99 SPO 1997 04 19 11 06 69 3.5 -9 696.00 -54.1 -51.0 -54.2 61 -99 SPO 1997 04 19 11 07 69 3.4 -9 696.00 -54.1 -51.1 -54.2 62 -99 SPO 1997 04 19 11 08 69 3.7 -9 696.00 -54.0 -51.1 -54.1 63 -99 SPO 1997 04 19 11 09 69 4.0 -9 696.00 -54.0 -51.1 -54.1 63 -99 SPO 1997 04 19 11 10 67 4.5 -9 696.00 -54.0 -50.9 -54.1 63 -99 SPO 1997 04 19 11 11 66 4.8 -9 696.00 -53.9 -50.8 -53.9 63 -99 SPO 1997 04 19 11 12 67 4.6 -9 695.90 -53.8 -50.8 -53.7 62 -99 SPO 1997 04 19 11 13 64 5.0 -9 695.90 -53.6 -50.6 -53.7 62 -99 SPO 1997 04 19 11 14 64 5.3 -9 695.90 -53.6 -50.6 -53.8 62 -99 SPO 1997 04 19 11 15 65 5.6 -9 695.90 -53.6 -50.5 -53.7 61 -99 SPO 1997 04 19 11 16 66 5.5 -9 695.90 -53.6 -50.4 -53.6 61 -99 SPO 1997 04 19 11 17 65 5.7 -9 695.90 -53.6 -50.4 -53.6 62 -99 SPO 1997 04 19 11 18 65 5.6 -9 695.80 -53.6 -50.4 -53.6 64 -99 SPO 1997 04 19 11 19 66 5.8 -9 695.80 -53.5 -50.2 -53.6 64 -99 SPO 1997 04 19 11 20 65 5.8 -9 695.80 -53.5 -50.2 -53.6 64 -99 SPO 1997 04 19 11 21 66 5.8 -9 695.80 -53.5 -50.2 -53.5 64 -99 SPO 1997 04 19 11 22 65 5.6 -9 695.80 -53.4 -50.1 -53.5 63 -99 SPO 1997 04 19 11 23 66 5.7 -9 695.80 -53.4 -50.2 -53.5 63 -99 SPO 1997 04 19 11 24 67 5.8 -9 695.80 -53.5 -50.2 -53.6 63 -99 SPO 1997 04 19 11 25 65 5.9 -9 695.70 -53.5 -50.1 -53.6 62 -99 SPO 1997 04 19 11 26 64 5.9 -9 695.80 -53.5 -50.2 -53.6 62 -99 SPO 1997 04 19 11 27 64 6.0 -9 695.80 -53.6 -50.1 -53.8 62 -99 SPO 1997 04 19 11 28 64 6.2 -9 695.80 -53.8 -50.2 -54.0 63 -99 SPO 1997 04 19 11 29 64 6.5 -9 695.70 -54.0 -50.2 -54.0 63 -99 SPO 1997 04 19 11 30 65 6.5 -9 695.70 -54.0 -50.0 -54.0 63 -99 SPO 1997 04 19 11 31 64 6.5 -9 695.70 -53.9 -50.1 -53.9 64 -99 SPO 1997 04 19 11 32 64 6.5 -9 695.70 -53.9 -50.2 -53.9 64 -99 SPO 1997 04 19 11 33 65 6.6 -9 695.70 -53.9 -50.0 -54.0 64 -99 SPO 1997 04 19 11 34 65 6.8 -9 695.70 -54.0 -50.0 -54.0 64 -99 SPO 1997 04 19 11 35 66 6.7 -9 695.70 -54.0 -50.0 -54.0 64 -99 SPO 1997 04 19 11 36 65 6.9 -9 695.70 -53.9 -49.9 -54.0 63 -99 SPO 1997 04 19 11 37 64 6.9 -9 695.70 -54.0 -49.9 -54.1 63 -99 SPO 1997 04 19 11 38 63 7.0 -9 695.70 -54.1 -49.9 -54.1 62 -99 SPO 1997 04 19 11 39 63 7.0 -9 695.70 -54.0 -50.0 -54.0 61 -99 SPO 1997 04 19 11 40 62 7.0 -9 695.60 -54.0 -50.1 -54.0 60 -99 SPO 1997 04 19 11 41 61 7.0 -9 695.60 -54.0 -50.1 -54.0 61 -99 SPO 1997 04 19 11 42 61 7.1 -9 695.60 -54.0 -50.2 -54.0 63 -99 SPO 1997 04 19 11 43 61 7.1 -9 695.60 -54.0 -50.2 -54.0 63 -99 SPO 1997 04 19 11 44 61 7.2 -9 695.60 -54.0 -50.1 -54.0 63 -99 SPO 1997 04 19 11 45 61 7.4 -9 695.60 -54.0 -50.0 -54.0 63 -99 SPO 1997 04 19 11 46 60 7.4 -9 695.60 -54.0 -50.0 -54.0 63 -99 SPO 1997 04 19 11 47 59 7.4 -9 695.60 -53.9 -50.0 -53.8 63 -99 SPO 1997 04 19 11 48 59 7.5 -9 695.60 -53.8 -50.0 -53.8 62 -99 SPO 1997 04 19 11 49 59 7.5 -9 695.60 -53.7 -50.0 -53.7 62 -99 SPO 1997 04 19 11 50 58 7.5 -9 695.60 -53.6 -49.9 -53.6 61 -99 SPO 1997 04 19 11 51 58 7.6 -9 695.50 -53.6 -49.8 -53.6 61 -99 SPO 1997 04 19 11 52 58 7.8 -9 695.50 -53.5 -49.6 -53.6 61 -99 SPO 1997 04 19 11 53 58 7.8 -9 695.50 -53.4 -49.7 -53.4 62 -99 SPO 1997 04 19 11 54 58 7.8 -9 695.50 -53.4 -49.7 -53.4 63 -99 SPO 1997 04 19 11 55 59 7.8 -9 695.50 -53.3 -49.8 -53.3 63 -99 SPO 1997 04 19 11 56 58 7.8 -9 695.50 -53.3 -49.8 -53.3 64 -99 SPO 1997 04 19 11 57 58 8.0 -9 695.50 -53.3 -49.8 -53.4 63 -99 SPO 1997 04 19 11 58 59 8.1 -9 695.50 -53.2 -49.8 -53.3 63 -99 SPO 1997 04 19 11 59 59 8.3 -9 695.40 -53.2 -49.8 -53.3 63 -99 SPO 1997 04 19 12 00 59 8.4 -9 695.40 -53.3 -49.8 -53.4 64 0 SPO 1997 04 19 12 01 59 8.3 -9 695.40 -53.3 -49.8 -53.4 63 -99 SPO 1997 04 19 12 02 59 8.4 -9 695.40 -53.3 -49.7 -53.4 63 -99 SPO 1997 04 19 12 03 59 8.2 -9 695.40 -53.3 -49.7 -53.4 63 -99 SPO 1997 04 19 12 04 59 8.1 -9 695.40 -53.3 -49.7 -53.4 63 -99 SPO 1997 04 19 12 05 59 8.2 -9 695.40 -53.3 -49.7 -53.4 64 -99 SPO 1997 04 19 12 06 59 8.1 -9 695.40 -53.3 -49.8 -53.4 64 -99 SPO 1997 04 19 12 07 59 8.0 -9 695.40 -53.3 -49.9 -53.4 64 -99 SPO 1997 04 19 12 08 59 8.0 -9 695.40 -53.3 -49.9 -53.4 64 -99 SPO 1997 04 19 12 09 58 7.9 -9 695.40 -53.3 -49.8 -53.4 64 -99 SPO 1997 04 19 12 10 57 7.9 -9 695.40 -53.3 -49.8 -53.4 64 -99 SPO 1997 04 19 12 11 57 7.8 -9 695.40 -53.2 -49.9 -53.3 64 -99 SPO 1997 04 19 12 12 56 7.8 -9 695.40 -53.2 -49.8 -53.3 64 -99 SPO 1997 04 19 12 13 57 7.8 -9 695.40 -53.2 -49.7 -53.2 63 -99 SPO 1997 04 19 12 14 57 7.9 -9 695.40 -53.2 -49.7 -53.2 63 -99 SPO 1997 04 19 12 15 58 8.0 -9 695.40 -53.1 -49.8 -53.2 62 -99 SPO 1997 04 19 12 16 59 7.8 -9 695.40 -53.1 -49.8 -53.2 63 -99 SPO 1997 04 19 12 17 59 7.7 -9 695.40 -53.1 -50.0 -53.2 64 -99 SPO 1997 04 19 12 18 59 7.4 -9 695.40 -53.1 -50.2 -53.2 64 -99 SPO 1997 04 19 12 19 60 7.3 -9 695.40 -53.1 -50.2 -53.3 64 -99 SPO 1997 04 19 12 20 61 7.3 -9 695.50 -53.2 -50.1 -53.3 65 -99 SPO 1997 04 19 12 21 62 7.4 -9 695.50 -53.2 -50.1 -53.4 64 -99 SPO 1997 04 19 12 22 63 7.4 -9 695.40 -53.3 -50.3 -53.4 64 -99 SPO 1997 04 19 12 23 65 7.2 -9 695.50 -53.3 -50.3 -53.4 64 -99 SPO 1997 04 19 12 24 66 7.1 -9 695.40 -53.4 -50.3 -53.5 64 -99 SPO 1997 04 19 12 25 66 7.3 -9 695.50 -53.4 -50.3 -53.6 62 -99 SPO 1997 04 19 12 26 67 7.4 -9 695.50 -53.5 -50.3 -53.6 61 -99 SPO 1997 04 19 12 27 67 7.4 -9 695.50 -53.5 -50.4 -53.7 62 -99 SPO 1997 04 19 12 28 67 7.5 -9 695.50 -53.6 -50.4 -53.6 63 -99 SPO 1997 04 19 12 29 67 7.7 -9 695.50 -53.6 -50.2 -53.7 63 -99 SPO 1997 04 19 12 30 67 7.8 -9 695.40 -53.6 -50.0 -53.7 63 -99 SPO 1997 04 19 12 31 66 7.8 -9 695.50 -53.6 -50.0 -53.6 64 -99 SPO 1997 04 19 12 32 66 7.6 -9 695.40 -53.5 -50.2 -53.5 64 -99 SPO 1997 04 19 12 33 66 7.6 -9 695.40 -53.5 -50.3 -53.5 64 -99 SPO 1997 04 19 12 34 65 7.3 -9 695.40 -53.5 -50.2 -53.5 64 -99 SPO 1997 04 19 12 35 64 7.6 -9 695.40 -53.5 -50.1 -53.6 64 -99 SPO 1997 04 19 12 36 62 7.4 -9 695.40 -53.5 -50.2 -53.6 64 -99 SPO 1997 04 19 12 37 61 7.5 -9 695.40 -53.5 -50.2 -53.6 63 -99 SPO 1997 04 19 12 38 62 7.7 -9 695.40 -53.6 -50.1 -53.7 63 -99 SPO 1997 04 19 12 39 62 7.7 -9 695.40 -53.6 -50.0 -53.7 62 -99 SPO 1997 04 19 12 40 63 7.7 -9 695.30 -53.6 -50.0 -53.7 63 -99 SPO 1997 04 19 12 41 62 7.7 -9 695.30 -53.6 -50.0 -53.7 64 -99 SPO 1997 04 19 12 42 62 7.6 -9 695.30 -53.6 -50.0 -53.7 64 -99 SPO 1997 04 19 12 43 62 7.7 -9 695.30 -53.6 -50.0 -53.6 64 -99 SPO 1997 04 19 12 44 61 7.7 -9 695.30 -53.6 -50.0 -53.6 64 -99 SPO 1997 04 19 12 45 61 7.6 -9 695.30 -53.5 -50.0 -53.5 64 -99 SPO 1997 04 19 12 46 59 7.6 -9 695.30 -53.4 -50.0 -53.5 62 -99 SPO 1997 04 19 12 47 60 7.7 -9 695.30 -53.4 -49.9 -53.5 62 -99 SPO 1997 04 19 12 48 59 7.6 -9 695.30 -53.4 -49.8 -53.4 62 -99 SPO 1997 04 19 12 49 59 7.6 -9 695.30 -53.4 -49.8 -53.4 62 -99 SPO 1997 04 19 12 50 59 7.5 -9 695.30 -53.3 -49.9 -53.4 61 -99 SPO 1997 04 19 12 51 59 7.6 -9 695.30 -53.3 -50.0 -53.4 61 -99 SPO 1997 04 19 12 52 58 7.7 -9 695.30 -53.3 -50.0 -53.4 63 -99 SPO 1997 04 19 12 53 58 7.7 -9 695.20 -53.2 -49.9 -53.2 63 -99 SPO 1997 04 19 12 54 57 7.7 -9 695.20 -53.2 -49.8 -53.2 64 -99 SPO 1997 04 19 12 55 56 7.7 -9 695.30 -53.1 -49.8 -53.1 64 -99 SPO 1997 04 19 12 56 56 7.8 -9 695.20 -53.0 -49.8 -53.1 64 -99 SPO 1997 04 19 12 57 55 7.7 -9 695.20 -53.0 -49.8 -53.0 64 -99 SPO 1997 04 19 12 58 55 8.0 -9 695.20 -52.9 -49.8 -52.9 64 -99 SPO 1997 04 19 12 59 55 8.1 -9 695.20 -52.8 -49.7 -52.9 63 -99 SPO 1997 04 19 13 00 54 8.2 -9 695.20 -52.8 -49.6 -52.8 63 0 SPO 1997 04 19 13 01 54 8.1 -9 695.20 -52.8 -49.6 -52.8 63 -99 SPO 1997 04 19 13 02 53 8.0 -9 695.20 -52.7 -49.6 -52.7 62 -99 SPO 1997 04 19 13 03 54 8.0 -9 695.20 -52.7 -49.6 -52.7 63 -99 SPO 1997 04 19 13 04 53 8.3 -9 695.20 -52.6 -49.6 -52.7 62 -99 SPO 1997 04 19 13 05 53 8.3 -9 695.20 -52.6 -49.4 -52.6 62 -99 SPO 1997 04 19 13 06 52 8.5 -9 695.20 -52.5 -49.4 -52.5 62 -99 SPO 1997 04 19 13 07 51 8.6 -9 695.20 -52.4 -49.5 -52.4 62 -99 SPO 1997 04 19 13 08 50 8.4 -9 695.20 -52.3 -49.6 -52.2 63 -99 SPO 1997 04 19 13 09 50 8.3 -9 695.20 -52.2 -49.7 -52.2 63 -99 SPO 1997 04 19 13 10 50 8.1 -9 695.20 -52.2 -49.7 -52.2 64 -99 SPO 1997 04 19 13 11 50 8.1 -9 695.20 -52.2 -49.7 -52.3 64 -99 SPO 1997 04 19 13 12 50 7.9 -9 695.20 -52.2 -49.7 -52.2 64 -99 SPO 1997 04 19 13 13 50 7.9 -9 695.20 -52.2 -49.8 -52.3 63 -99 SPO 1997 04 19 13 14 49 7.8 -9 695.20 -52.2 -49.8 -52.3 62 -99 SPO 1997 04 19 13 15 49 7.9 -9 695.20 -52.2 -49.9 -52.3 62 -99 SPO 1997 04 19 13 16 49 8.0 -9 695.20 -52.2 -49.9 -52.2 63 -99 SPO 1997 04 19 13 17 49 7.8 -9 695.10 -52.1 -49.8 -52.2 63 -99 SPO 1997 04 19 13 18 48 7.7 -9 695.20 -52.1 -49.9 -52.2 64 -99 SPO 1997 04 19 13 19 49 7.8 -9 695.20 -52.1 -49.8 -52.2 64 -99 SPO 1997 04 19 13 20 48 7.7 -9 695.20 -52.1 -49.8 -52.1 65 -99 SPO 1997 04 19 13 21 47 7.7 -9 695.20 -52.0 -49.8 -52.1 65 -99 SPO 1997 04 19 13 22 48 7.7 -9 695.20 -52.0 -49.7 -52.1 64 -99 SPO 1997 04 19 13 23 48 7.7 -9 695.20 -52.0 -49.7 -52.0 64 -99 SPO 1997 04 19 13 24 48 7.7 -9 695.20 -52.0 -49.8 -52.0 64 -99 SPO 1997 04 19 13 25 47 7.8 -9 695.10 -51.9 -49.9 -52.0 63 -99 SPO 1997 04 19 13 26 48 7.7 -9 695.20 -51.9 -49.9 -51.9 63 -99 SPO 1997 04 19 13 27 48 7.5 -9 695.10 -51.9 -49.9 -52.0 63 -99 SPO 1997 04 19 13 28 50 7.6 -9 695.10 -51.9 -50.0 -52.0 64 -99 SPO 1997 04 19 13 29 50 7.5 -9 695.10 -51.9 -49.9 -52.0 64 -99 SPO 1997 04 19 13 30 51 7.5 -9 695.10 -51.9 -49.9 -52.1 63 -99 SPO 1997 04 19 13 31 51 7.4 -9 695.10 -52.0 -49.9 -52.1 64 -99 SPO 1997 04 19 13 32 51 7.4 -9 695.10 -52.0 -49.9 -52.0 65 -99 SPO 1997 04 19 13 33 52 7.4 -9 695.10 -52.0 -49.9 -52.1 65 -99 SPO 1997 04 19 13 34 52 7.5 -9 695.10 -51.9 -49.8 -52.0 65 -99 SPO 1997 04 19 13 35 53 7.3 -9 695.10 -51.9 -49.9 -52.0 63 -99 SPO 1997 04 19 13 36 54 7.2 -9 695.10 -52.0 -49.9 -52.0 64 -99 SPO 1997 04 19 13 37 54 7.2 -9 695.10 -52.0 -49.9 -52.1 63 -99 SPO 1997 04 19 13 38 54 7.0 -9 695.10 -52.0 -50.0 -52.1 63 -99 SPO 1997 04 19 13 39 54 7.1 -9 695.10 -52.0 -50.0 -52.2 63 -99 SPO 1997 04 19 13 40 54 7.0 -9 695.10 -52.0 -50.0 -52.1 63 -99 SPO 1997 04 19 13 41 55 7.0 -9 695.10 -52.0 -50.1 -52.2 64 -99 SPO 1997 04 19 13 42 55 6.9 -9 695.20 -52.1 -50.1 -52.2 65 -99 SPO 1997 04 19 13 43 55 6.8 -9 695.10 -52.1 -50.2 -52.1 65 -99 SPO 1997 04 19 13 44 56 6.8 -9 695.20 -52.1 -50.2 -52.2 65 -99 SPO 1997 04 19 13 45 57 6.9 -9 695.20 -52.1 -50.3 -52.3 65 -99 SPO 1997 04 19 13 46 57 6.9 -9 695.20 -52.2 -50.3 -52.3 65 -99 SPO 1997 04 19 13 47 58 6.6 -9 695.20 -52.2 -50.3 -52.3 64 -99 SPO 1997 04 19 13 48 59 6.7 -9 695.20 -52.2 -50.3 -52.4 62 -99 SPO 1997 04 19 13 49 59 6.3 -9 695.20 -52.2 -50.4 -52.4 62 -99 SPO 1997 04 19 13 50 60 6.3 -9 695.20 -52.3 -50.4 -52.5 62 -99 SPO 1997 04 19 13 51 61 6.5 -9 695.20 -52.4 -50.5 -52.5 64 -99 SPO 1997 04 19 13 52 61 6.4 -9 695.20 -52.4 -50.5 -52.6 64 -99 SPO 1997 04 19 13 53 61 6.4 -9 695.10 -52.5 -50.5 -52.6 65 -99 SPO 1997 04 19 13 54 62 6.7 -9 695.20 -52.6 -50.5 -52.7 65 -99 SPO 1997 04 19 13 55 62 6.5 -9 695.10 -52.6 -50.5 -52.7 65 -99 SPO 1997 04 19 13 56 63 6.6 -9 695.10 -52.6 -50.5 -52.8 65 -99 SPO 1997 04 19 13 57 63 6.8 -9 695.10 -52.7 -50.5 -52.8 65 -99 SPO 1997 04 19 13 58 62 7.0 -9 695.10 -52.7 -50.5 -52.8 64 -99 SPO 1997 04 19 13 59 62 6.9 -9 695.10 -52.7 -50.5 -52.8 64 -99 SPO 1997 04 19 14 00 62 6.9 -9 695.10 -52.7 -50.5 -52.8 64 0 SPO 1997 04 19 14 01 64 7.0 -9 695.10 -52.7 -50.4 -52.8 63 -99 SPO 1997 04 19 14 02 64 7.0 -9 695.10 -52.8 -50.4 -52.8 64 -99 SPO 1997 04 19 14 03 65 7.0 -9 695.10 -52.8 -50.4 -52.9 65 -99 SPO 1997 04 19 14 04 65 7.0 -9 695.10 -52.8 -50.3 -52.9 65 -99 SPO 1997 04 19 14 05 64 7.1 -9 695.10 -52.8 -50.2 -52.9 65 -99 SPO 1997 04 19 14 06 64 6.9 -9 695.10 -52.8 -50.3 -52.9 64 -99 SPO 1997 04 19 14 07 65 6.9 -9 695.10 -52.8 -50.4 -52.9 64 -99 SPO 1997 04 19 14 08 65 7.0 -9 695.10 -52.9 -50.4 -52.9 65 -99 SPO 1997 04 19 14 09 64 7.0 -9 695.10 -52.9 -50.4 -53.0 65 -99 SPO 1997 04 19 14 10 63 7.1 -9 695.10 -52.9 -50.4 -53.0 65 -99 SPO 1997 04 19 14 11 63 7.1 -9 695.10 -52.9 -50.3 -53.0 64 -99 SPO 1997 04 19 14 12 63 7.1 -9 695.10 -52.9 -50.4 -52.9 63 -99 SPO 1997 04 19 14 13 62 7.0 -9 695.10 -52.9 -50.4 -52.9 63 -99 SPO 1997 04 19 14 14 62 7.0 -9 695.10 -52.9 -50.4 -53.0 64 -99 SPO 1997 04 19 14 15 63 6.9 -9 695.00 -52.9 -50.5 -53.0 64 -99 SPO 1997 04 19 14 16 64 6.8 -9 695.00 -52.9 -50.5 -53.0 63 -99 SPO 1997 04 19 14 17 64 6.7 -9 695.10 -53.0 -50.5 -53.1 64 -99 SPO 1997 04 19 14 18 64 6.6 -9 695.00 -53.1 -50.7 -53.2 64 -99 SPO 1997 04 19 14 19 66 6.5 -9 695.10 -53.1 -50.9 -53.2 63 -99 SPO 1997 04 19 14 20 67 6.2 -9 695.00 -53.2 -50.9 -53.3 64 -99 SPO 1997 04 19 14 21 67 6.3 -9 695.00 -53.2 -51.0 -53.3 63 -99 SPO 1997 04 19 14 22 68 6.5 -9 695.00 -53.3 -51.0 -53.3 63 -99 SPO 1997 04 19 14 23 68 6.4 -9 695.00 -53.3 -51.1 -53.4 63 -99 SPO 1997 04 19 14 24 68 6.3 -9 695.00 -53.3 -51.1 -53.4 63 -99 SPO 1997 04 19 14 25 70 6.4 -9 695.00 -53.4 -51.0 -53.4 64 -99 SPO 1997 04 19 14 26 71 6.2 -9 695.00 -53.4 -51.0 -53.5 64 -99 SPO 1997 04 19 14 27 70 6.3 -9 695.00 -53.5 -51.0 -53.5 64 -99 SPO 1997 04 19 14 28 69 6.3 -9 695.00 -53.4 -50.9 -53.5 64 -99 SPO 1997 04 19 14 29 69 6.1 -9 695.00 -53.4 -51.0 -53.5 64 -99 SPO 1997 04 19 14 30 70 6.3 -9 695.00 -53.4 -51.1 -53.4 64 -99 SPO 1997 04 19 14 31 70 6.2 -9 695.00 -53.3 -51.1 -53.4 64 -99 SPO 1997 04 19 14 32 70 6.2 -9 695.00 -53.4 -51.0 -53.5 64 -99 SPO 1997 04 19 14 33 69 6.5 -9 695.00 -53.4 -51.0 -53.6 62 -99 SPO 1997 04 19 14 34 68 6.5 -9 695.00 -53.5 -51.0 -53.6 63 -99 SPO 1997 04 19 14 35 69 6.4 -9 695.00 -53.5 -51.1 -53.6 63 -99 SPO 1997 04 19 14 36 70 6.3 -9 695.00 -53.5 -51.1 -53.6 62 -99 SPO 1997 04 19 14 37 71 6.4 -9 695.00 -53.6 -51.1 -53.7 63 -99 SPO 1997 04 19 14 38 73 6.3 -9 695.00 -53.6 -51.0 -53.7 64 -99 SPO 1997 04 19 14 39 71 6.1 -9 695.00 -53.7 -51.1 -53.8 64 -99 SPO 1997 04 19 14 40 70 6.3 -9 695.00 -53.7 -51.1 -53.8 64 -99 SPO 1997 04 19 14 41 71 6.3 -9 695.00 -53.8 -51.0 -53.9 64 -99 SPO 1997 04 19 14 42 70 6.3 -9 695.00 -53.8 -51.0 -53.9 64 -99 SPO 1997 04 19 14 43 71 6.4 -9 695.00 -53.9 -51.0 -54.0 64 -99 SPO 1997 04 19 14 44 71 6.4 -9 695.00 -53.9 -51.0 -54.0 63 -99 SPO 1997 04 19 14 45 72 6.5 -9 695.00 -53.9 -50.9 -54.0 63 -99 SPO 1997 04 19 14 46 71 6.4 -9 695.00 -54.0 -50.9 -54.0 63 -99 SPO 1997 04 19 14 47 73 6.4 -9 694.90 -54.0 -50.9 -54.0 61 -99 SPO 1997 04 19 14 48 73 6.3 -9 695.00 -54.0 -50.9 -54.1 61 -99 SPO 1997 04 19 14 49 74 6.3 -9 695.00 -54.1 -50.9 -54.2 62 -99 SPO 1997 04 19 14 50 73 6.2 -9 695.00 -54.1 -51.0 -54.2 62 -99 SPO 1997 04 19 14 51 72 6.2 -9 695.00 -54.2 -51.0 -54.3 63 -99 SPO 1997 04 19 14 52 72 6.2 -9 695.00 -54.3 -50.9 -54.4 63 -99 SPO 1997 04 19 14 53 72 6.2 -9 695.00 -54.3 -50.9 -54.4 63 -99 SPO 1997 04 19 14 54 74 6.3 -9 695.00 -54.3 -50.9 -54.4 62 -99 SPO 1997 04 19 14 55 74 6.3 -9 695.00 -54.4 -50.9 -54.4 63 -99 SPO 1997 04 19 14 56 73 6.3 -9 695.00 -54.4 -51.0 -54.5 63 -99 SPO 1997 04 19 14 57 72 6.3 -9 695.00 -54.4 -51.0 -54.5 61 -99 SPO 1997 04 19 14 58 73 6.4 -9 695.00 -54.4 -51.0 -54.5 60 -99 SPO 1997 04 19 14 59 74 6.4 -9 695.00 -54.5 -51.0 -54.5 61 -99 SPO 1997 04 19 15 00 74 6.6 -9 695.00 -54.5 -50.9 -54.6 61 0 SPO 1997 04 19 15 01 74 6.7 -9 695.00 -54.5 -50.8 -54.5 61 -99 SPO 1997 04 19 15 02 74 6.7 -9 694.90 -54.5 -50.7 -54.5 61 -99 SPO 1997 04 19 15 03 75 6.4 -9 694.90 -54.5 -50.7 -54.5 62 -99 SPO 1997 04 19 15 04 76 6.5 -9 694.90 -54.5 -50.7 -54.6 62 -99 SPO 1997 04 19 15 05 77 6.3 -9 694.90 -54.6 -50.8 -54.7 63 -99 SPO 1997 04 19 15 06 78 6.3 -9 694.90 -54.6 -50.8 -54.7 62 -99 SPO 1997 04 19 15 07 78 6.3 -9 694.90 -54.7 -50.9 -54.8 62 -99 SPO 1997 04 19 15 08 78 6.4 -9 694.90 -54.7 -50.9 -54.8 62 -99 SPO 1997 04 19 15 09 78 6.4 -9 694.80 -54.7 -50.9 -54.7 61 -99 SPO 1997 04 19 15 10 78 6.3 -9 694.90 -54.6 -50.9 -54.6 60 -99 SPO 1997 04 19 15 11 79 6.0 -9 694.90 -54.6 -51.0 -54.8 60 -99 SPO 1997 04 19 15 12 80 6.0 -9 694.80 -54.8 -51.0 -54.9 61 -99 SPO 1997 04 19 15 13 81 6.2 -9 694.80 -54.8 -51.0 -55.0 60 -99 SPO 1997 04 19 15 14 81 6.4 -9 694.80 -55.0 -51.0 -55.1 61 -99 SPO 1997 04 19 15 15 80 6.9 -9 694.80 -55.0 -51.0 -55.0 61 -99 SPO 1997 04 19 15 16 80 7.1 -9 694.80 -54.8 -50.9 -54.7 59 -99 SPO 1997 04 19 15 17 80 7.1 -9 694.70 -54.7 -50.8 -54.6 60 -99 SPO 1997 04 19 15 18 80 7.0 -9 694.70 -54.6 -50.8 -54.6 60 -99 SPO 1997 04 19 15 19 80 6.7 -9 694.80 -54.6 -50.8 -54.7 60 -99 SPO 1997 04 19 15 20 79 6.7 -9 694.80 -54.6 -50.8 -54.8 60 -99 SPO 1997 04 19 15 21 80 6.8 -9 694.70 -54.8 -50.8 -54.9 61 -99 SPO 1997 04 19 15 22 79 6.5 -9 694.70 -54.8 -50.7 -55.0 59 -99 SPO 1997 04 19 15 23 79 6.9 -9 694.70 -54.9 -50.8 -55.0 59 -99 SPO 1997 04 19 15 24 79 7.0 -9 694.70 -54.9 -50.8 -55.0 59 -99 SPO 1997 04 19 15 25 78 7.0 -9 694.70 -54.9 -50.8 -54.9 60 -99 SPO 1997 04 19 15 26 77 7.1 -9 694.70 -54.9 -50.7 -54.9 62 -99 SPO 1997 04 19 15 27 76 7.1 -9 694.70 -54.8 -50.7 -54.8 61 -99 SPO 1997 04 19 15 28 76 6.9 -9 694.70 -54.8 -50.7 -54.8 62 -99 SPO 1997 04 19 15 29 76 7.0 -9 694.70 -54.7 -50.7 -54.7 62 -99 SPO 1997 04 19 15 30 76 7.0 -9 694.70 -54.7 -50.6 -54.7 62 -99 SPO 1997 04 19 15 31 77 7.0 -9 694.70 -54.7 -50.6 -54.7 61 -99 SPO 1997 04 19 15 32 77 7.0 -9 694.70 -54.7 -50.6 -54.8 61 -99 SPO 1997 04 19 15 33 77 7.0 -9 694.60 -54.7 -50.7 -54.8 61 -99 SPO 1997 04 19 15 34 76 7.2 -9 694.60 -54.6 -50.7 -54.7 60 -99 SPO 1997 04 19 15 35 76 7.0 -9 694.60 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 15 36 75 7.2 -9 694.60 -54.6 -50.6 -54.7 60 -99 SPO 1997 04 19 15 37 74 7.2 -9 694.60 -54.6 -50.5 -54.6 61 -99 SPO 1997 04 19 15 38 74 7.5 -9 694.60 -54.6 -50.4 -54.6 62 -99 SPO 1997 04 19 15 39 73 7.3 -9 694.60 -54.5 -50.4 -54.5 61 -99 SPO 1997 04 19 15 40 73 7.3 -9 694.60 -54.4 -50.4 -54.5 61 -99 SPO 1997 04 19 15 41 73 7.5 -9 694.60 -54.4 -50.4 -54.4 61 -99 SPO 1997 04 19 15 42 72 7.1 -9 694.60 -54.3 -50.4 -54.4 61 -99 SPO 1997 04 19 15 43 72 7.1 -9 694.60 -54.3 -50.4 -54.4 62 -99 SPO 1997 04 19 15 44 73 7.1 -9 694.60 -54.2 -50.5 -54.3 60 -99 SPO 1997 04 19 15 45 73 6.9 -9 694.60 -54.2 -50.6 -54.3 61 -99 SPO 1997 04 19 15 46 75 6.9 -9 694.60 -54.2 -50.7 -54.3 60 -99 SPO 1997 04 19 15 47 75 6.9 -9 694.60 -54.2 -50.7 -54.4 61 -99 SPO 1997 04 19 15 48 76 6.8 -9 694.60 -54.3 -50.7 -54.4 62 -99 SPO 1997 04 19 15 49 76 6.9 -9 694.60 -54.3 -50.7 -54.4 62 -99 SPO 1997 04 19 15 50 75 6.8 -9 694.60 -54.3 -50.8 -54.4 62 -99 SPO 1997 04 19 15 51 75 7.0 -9 694.70 -54.3 -50.8 -54.4 62 -99 SPO 1997 04 19 15 52 76 7.0 -9 694.70 -54.3 -50.6 -54.4 62 -99 SPO 1997 04 19 15 53 76 7.2 -9 694.70 -54.4 -50.6 -54.4 63 -99 SPO 1997 04 19 15 54 76 7.0 -9 694.70 -54.4 -50.6 -54.5 63 -99 SPO 1997 04 19 15 55 76 7.0 -9 694.70 -54.4 -50.7 -54.5 62 -99 SPO 1997 04 19 15 56 76 7.0 -9 694.70 -54.4 -50.6 -54.6 62 -99 SPO 1997 04 19 15 57 76 7.2 -9 694.70 -54.5 -50.6 -54.6 61 -99 SPO 1997 04 19 15 58 76 7.1 -9 694.60 -54.5 -50.7 -54.6 61 -99 SPO 1997 04 19 15 59 76 7.2 -9 694.60 -54.5 -50.7 -54.6 62 -99 SPO 1997 04 19 16 00 75 7.2 -9 694.70 -54.5 -50.7 -54.5 63 0 SPO 1997 04 19 16 01 75 7.0 -9 694.70 -54.5 -50.7 -54.5 63 -99 SPO 1997 04 19 16 02 74 7.0 -9 694.60 -54.5 -50.7 -54.5 63 -99 SPO 1997 04 19 16 03 73 7.0 -9 694.60 -54.5 -50.6 -54.5 63 -99 SPO 1997 04 19 16 04 73 7.2 -9 694.60 -54.4 -50.5 -54.4 62 -99 SPO 1997 04 19 16 05 72 7.3 -9 694.60 -54.4 -50.5 -54.4 63 -99 SPO 1997 04 19 16 06 72 7.3 -9 694.60 -54.3 -50.4 -54.3 62 -99 SPO 1997 04 19 16 07 72 7.3 -9 694.60 -54.3 -50.3 -54.3 62 -99 SPO 1997 04 19 16 08 72 7.2 -9 694.60 -54.2 -50.2 -54.3 61 -99 SPO 1997 04 19 16 09 73 7.2 -9 694.60 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 16 10 74 7.3 -9 694.60 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 16 11 74 7.2 -9 694.60 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 16 12 73 7.2 -9 694.60 -54.2 -50.3 -54.3 63 -99 SPO 1997 04 19 16 13 74 7.3 -9 694.60 -54.2 -50.2 -54.3 63 -99 SPO 1997 04 19 16 14 73 7.0 -9 694.60 -54.1 -50.2 -54.2 62 -99 SPO 1997 04 19 16 15 73 7.1 -9 694.60 -54.1 -50.3 -54.2 63 -99 SPO 1997 04 19 16 16 73 7.0 -9 694.60 -54.1 -50.3 -54.2 63 -99 SPO 1997 04 19 16 17 73 7.1 -9 694.60 -54.0 -50.2 -54.1 63 -99 SPO 1997 04 19 16 18 71 7.0 -9 694.60 -54.0 -50.2 -54.0 63 -99 SPO 1997 04 19 16 19 70 7.0 -9 694.60 -54.0 -50.1 -54.0 63 -99 SPO 1997 04 19 16 20 69 7.0 -9 694.50 -54.0 -50.1 -54.0 63 -99 SPO 1997 04 19 16 21 69 7.0 -9 694.50 -54.0 -50.0 -54.0 61 -99 SPO 1997 04 19 16 22 70 7.1 -9 694.50 -53.9 -50.0 -54.0 60 -99 SPO 1997 04 19 16 23 70 7.0 -9 694.50 -53.9 -50.0 -54.0 62 -99 SPO 1997 04 19 16 24 69 7.0 -9 694.50 -53.9 -49.9 -54.0 63 -99 SPO 1997 04 19 16 25 68 6.9 -9 694.50 -53.8 -49.8 -54.0 63 -99 SPO 1997 04 19 16 26 68 6.9 -9 694.50 -53.8 -49.8 -54.0 63 -99 SPO 1997 04 19 16 27 69 6.8 -9 694.50 -53.8 -49.9 -54.0 63 -99 SPO 1997 04 19 16 28 69 6.9 -9 694.50 -53.9 -50.0 -54.0 63 -99 SPO 1997 04 19 16 29 69 6.8 -9 694.50 -53.9 -50.0 -54.0 63 -99 SPO 1997 04 19 16 30 70 6.9 -9 694.50 -53.9 -50.0 -54.0 63 -99 SPO 1997 04 19 16 31 70 6.9 -9 694.40 -53.9 -50.0 -54.0 62 -99 SPO 1997 04 19 16 32 69 6.9 -9 694.40 -53.9 -50.0 -54.0 60 -99 SPO 1997 04 19 16 33 70 7.0 -9 694.40 -53.9 -50.1 -54.0 60 -99 SPO 1997 04 19 16 34 70 7.0 -9 694.40 -53.9 -50.1 -54.0 62 -99 SPO 1997 04 19 16 35 70 7.1 -9 694.40 -53.9 -50.2 -54.0 63 -99 SPO 1997 04 19 16 36 70 6.8 -9 694.40 -53.9 -50.2 -54.0 63 -99 SPO 1997 04 19 16 37 71 6.8 -9 694.40 -53.9 -50.2 -54.0 63 -99 SPO 1997 04 19 16 38 71 6.7 -9 694.40 -53.9 -50.3 -54.0 63 -99 SPO 1997 04 19 16 39 72 6.9 -9 694.40 -54.0 -50.3 -54.1 64 -99 SPO 1997 04 19 16 40 73 6.8 -9 694.40 -54.0 -50.3 -54.1 64 -99 SPO 1997 04 19 16 41 75 6.8 -9 694.40 -54.0 -50.3 -54.2 63 -99 SPO 1997 04 19 16 42 75 6.8 -9 694.40 -54.1 -50.3 -54.2 63 -99 SPO 1997 04 19 16 43 76 6.8 -9 694.40 -54.1 -50.3 -54.2 62 -99 SPO 1997 04 19 16 44 75 6.8 -9 694.40 -54.2 -50.3 -54.3 63 -99 SPO 1997 04 19 16 45 74 7.0 -9 694.40 -54.2 -50.3 -54.3 62 -99 SPO 1997 04 19 16 46 74 7.1 -9 694.40 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 16 47 73 7.0 -9 694.40 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 16 48 74 7.0 -9 694.40 -54.2 -50.2 -54.2 61 -99 SPO 1997 04 19 16 49 73 6.9 -9 694.40 -54.2 -50.3 -54.2 62 -99 SPO 1997 04 19 16 50 74 6.8 -9 694.40 -54.2 -50.3 -54.3 63 -99 SPO 1997 04 19 16 51 73 6.9 -9 694.40 -54.3 -50.4 -54.4 63 -99 SPO 1997 04 19 16 52 71 6.9 -9 694.40 -54.3 -50.4 -54.4 63 -99 SPO 1997 04 19 16 53 70 6.9 -9 694.40 -54.3 -50.4 -54.4 62 -99 SPO 1997 04 19 16 54 70 6.8 -9 694.40 -54.3 -50.4 -54.3 62 -99 SPO 1997 04 19 16 55 69 6.7 -9 694.40 -54.3 -50.3 -54.3 62 -99 SPO 1997 04 19 16 56 70 6.7 -9 694.40 -54.3 -50.4 -54.4 62 -99 SPO 1997 04 19 16 57 69 6.8 -9 694.40 -54.3 -50.3 -54.4 62 -99 SPO 1997 04 19 16 58 68 6.6 -9 694.40 -54.3 -50.3 -54.5 62 -99 SPO 1997 04 19 16 59 69 6.5 -9 694.40 -54.4 -50.3 -54.5 63 -99 SPO 1997 04 19 17 00 69 6.6 -9 694.40 -54.4 -50.3 -54.5 63 0 SPO 1997 04 19 17 01 69 6.6 -9 694.40 -54.4 -50.2 -54.6 63 -99 SPO 1997 04 19 17 02 69 6.4 -9 694.40 -54.5 -50.2 -54.6 63 -99 SPO 1997 04 19 17 03 69 6.3 -9 694.40 -54.6 -50.2 -54.7 63 -99 SPO 1997 04 19 17 04 69 6.4 -9 694.40 -54.7 -50.2 -54.8 62 -99 SPO 1997 04 19 17 05 69 6.5 -9 694.40 -54.7 -50.2 -54.8 61 -99 SPO 1997 04 19 17 06 67 6.4 -9 694.30 -54.7 -50.2 -54.8 61 -99 SPO 1997 04 19 17 07 67 6.2 -9 694.40 -54.7 -50.3 -54.8 61 -99 SPO 1997 04 19 17 08 68 6.1 -9 694.30 -54.7 -50.4 -54.7 61 -99 SPO 1997 04 19 17 09 70 5.9 -9 694.40 -54.7 -50.4 -54.8 61 -99 SPO 1997 04 19 17 10 70 5.9 -9 694.40 -54.8 -50.4 -54.8 62 -99 SPO 1997 04 19 17 11 72 5.8 -9 694.40 -54.8 -50.4 -54.9 62 -99 SPO 1997 04 19 17 12 73 5.8 -9 694.40 -54.8 -50.5 -54.9 62 -99 SPO 1997 04 19 17 13 73 5.9 -9 694.40 -54.8 -50.4 -54.9 62 -99 SPO 1997 04 19 17 14 72 6.0 -9 694.40 -54.8 -50.3 -54.9 62 -99 SPO 1997 04 19 17 15 71 6.0 -9 694.40 -54.8 -50.2 -54.9 62 -99 SPO 1997 04 19 17 16 70 5.8 -9 694.40 -54.8 -50.2 -54.9 62 -99 SPO 1997 04 19 17 17 70 5.8 -9 694.40 -54.8 -50.2 -54.8 62 -99 SPO 1997 04 19 17 18 71 5.6 -9 694.40 -54.8 -50.2 -54.9 61 -99 SPO 1997 04 19 17 19 73 5.5 -9 694.40 -54.8 -50.2 -54.9 61 -99 SPO 1997 04 19 17 20 74 5.4 -9 694.40 -54.8 -50.2 -55.0 61 -99 SPO 1997 04 19 17 21 75 5.5 -9 694.40 -54.9 -50.4 -55.1 61 -99 SPO 1997 04 19 17 22 75 5.5 -9 694.40 -55.0 -50.4 -55.2 61 -99 SPO 1997 04 19 17 23 74 5.8 -9 694.30 -55.2 -50.5 -55.3 62 -99 SPO 1997 04 19 17 24 73 6.0 -9 694.30 -55.2 -50.4 -55.3 62 -99 SPO 1997 04 19 17 25 72 5.7 -9 694.40 -55.2 -50.4 -55.2 62 -99 SPO 1997 04 19 17 26 72 5.7 -9 694.30 -55.1 -50.4 -55.1 62 -99 SPO 1997 04 19 17 27 71 5.8 -9 694.30 -55.1 -50.4 -55.1 62 -99 SPO 1997 04 19 17 28 72 5.7 -9 694.30 -55.1 -50.3 -55.1 61 -99 SPO 1997 04 19 17 29 72 5.7 -9 694.30 -55.1 -50.4 -55.1 61 -99 SPO 1997 04 19 17 30 73 5.7 -9 694.30 -55.0 -50.4 -55.1 60 -99 SPO 1997 04 19 17 31 74 5.5 -9 694.30 -55.0 -50.3 -55.1 59 -99 SPO 1997 04 19 17 32 76 5.3 -9 694.30 -55.1 -50.3 -55.2 60 -99 SPO 1997 04 19 17 33 78 5.4 -9 694.30 -55.2 -50.4 -55.3 62 -99 SPO 1997 04 19 17 34 79 5.4 -9 694.30 -55.3 -50.4 -55.4 62 -99 SPO 1997 04 19 17 35 79 5.5 -9 694.30 -55.4 -50.5 -55.6 62 -99 SPO 1997 04 19 17 36 80 5.5 -9 694.30 -55.5 -50.5 -55.7 62 -99 SPO 1997 04 19 17 37 80 5.6 -9 694.30 -55.6 -50.5 -55.7 62 -99 SPO 1997 04 19 17 38 79 5.6 -9 694.30 -55.7 -50.5 -55.8 62 -99 SPO 1997 04 19 17 39 77 5.8 -9 694.30 -55.7 -50.4 -55.8 61 -99 SPO 1997 04 19 17 40 77 5.8 -9 694.30 -55.8 -50.3 -55.8 62 -99 SPO 1997 04 19 17 41 76 5.9 -9 694.30 -55.8 -50.3 -55.8 61 -99 SPO 1997 04 19 17 42 75 5.7 -9 694.30 -55.8 -50.3 -55.8 61 -99 SPO 1997 04 19 17 43 76 5.7 -9 694.30 -55.8 -50.3 -55.8 60 -99 SPO 1997 04 19 17 44 78 5.7 -9 694.30 -55.8 -50.3 -55.9 60 -99 SPO 1997 04 19 17 45 78 5.7 -9 694.30 -56.0 -50.2 -56.0 61 -99 SPO 1997 04 19 17 46 77 5.9 -9 694.30 -56.0 -50.2 -56.2 61 -99 SPO 1997 04 19 17 47 77 5.9 -9 694.30 -56.2 -50.2 -56.2 62 -99 SPO 1997 04 19 17 48 77 5.7 -9 694.30 -56.2 -50.2 -56.3 62 -99 SPO 1997 04 19 17 49 77 5.7 -9 694.30 -56.2 -50.2 -56.3 61 -99 SPO 1997 04 19 17 50 78 5.8 -9 694.30 -56.3 -50.2 -56.4 61 -99 SPO 1997 04 19 17 51 77 6.0 -9 694.20 -56.4 -50.1 -56.5 61 -99 SPO 1997 04 19 17 52 78 6.0 -9 694.20 -56.5 -50.1 -56.5 61 -99 SPO 1997 04 19 17 53 78 6.0 -9 694.20 -56.5 -50.1 -56.5 61 -99 SPO 1997 04 19 17 54 79 5.9 -9 694.20 -56.5 -50.1 -56.6 60 -99 SPO 1997 04 19 17 55 79 6.0 -9 694.20 -56.6 -50.2 -56.7 59 -99 SPO 1997 04 19 17 56 78 5.9 -9 694.20 -56.7 -50.3 -56.8 60 -99 SPO 1997 04 19 17 57 77 6.0 -9 694.20 -56.7 -50.2 -56.8 60 -99 SPO 1997 04 19 17 58 76 6.1 -9 694.20 -56.8 -50.2 -56.8 60 -99 SPO 1997 04 19 17 59 76 6.2 -9 694.20 -56.9 -50.2 -56.9 61 -99 SPO 1997 04 19 18 00 77 6.2 -9 694.20 -56.9 -50.2 -56.9 61 0 SPO 1997 04 19 18 01 77 6.2 -9 694.20 -56.9 -50.2 -57.0 61 -99 SPO 1997 04 19 18 02 78 6.2 -9 694.20 -56.8 -50.2 -56.9 61 -99 SPO 1997 04 19 18 03 78 6.2 -9 694.20 -56.9 -50.2 -57.0 61 -99 SPO 1997 04 19 18 04 79 6.2 -9 694.20 -56.9 -50.2 -57.0 60 -99 SPO 1997 04 19 18 05 80 6.2 -9 694.20 -56.9 -50.1 -56.9 60 -99 SPO 1997 04 19 18 06 81 6.3 -9 694.20 -56.8 -50.1 -56.8 60 -99 SPO 1997 04 19 18 07 82 6.3 -9 694.20 -56.8 -50.1 -56.8 60 -99 SPO 1997 04 19 18 08 82 6.2 -9 694.20 -56.7 -50.1 -56.7 60 -99 SPO 1997 04 19 18 09 82 6.2 -9 694.20 -56.7 -50.0 -56.7 60 -99 SPO 1997 04 19 18 10 83 6.3 -9 694.20 -56.7 -50.0 -56.7 60 -99 SPO 1997 04 19 18 11 82 6.3 -9 694.20 -56.7 -50.0 -56.8 60 -99 SPO 1997 04 19 18 12 81 6.3 -9 694.20 -56.7 -49.8 -56.8 59 -99 SPO 1997 04 19 18 13 80 6.2 -9 694.20 -56.7 -49.8 -56.7 60 -99 SPO 1997 04 19 18 14 80 6.3 -9 694.20 -56.6 -49.9 -56.8 58 -99 SPO 1997 04 19 18 15 80 6.3 -9 694.20 -56.8 -49.9 -56.9 60 -99 SPO 1997 04 19 18 16 81 6.3 -9 694.20 -56.9 -50.0 -57.0 60 -99 SPO 1997 04 19 18 17 81 6.3 -9 694.10 -56.9 -50.0 -56.9 60 -99 SPO 1997 04 19 18 18 81 6.3 -9 694.10 -56.8 -50.1 -56.6 59 -99 SPO 1997 04 19 18 19 81 6.4 -9 694.10 -56.6 -50.0 -56.4 59 -99 SPO 1997 04 19 18 20 81 6.4 -9 694.10 -56.4 -50.0 -56.4 59 -99 SPO 1997 04 19 18 21 81 6.4 -9 694.10 -56.2 -50.1 -56.3 59 -99 SPO 1997 04 19 18 22 82 6.4 -9 694.10 -56.2 -50.2 -56.3 60 -99 SPO 1997 04 19 18 23 83 6.4 -9 694.10 -56.2 -50.2 -56.2 61 -99 SPO 1997 04 19 18 24 85 6.3 -9 694.10 -56.1 -50.4 -56.2 61 -99 SPO 1997 04 19 18 25 85 6.2 -9 694.10 -56.1 -50.4 -56.2 61 -99 SPO 1997 04 19 18 26 84 6.2 -9 694.10 -56.1 -50.5 -56.1 61 -99 SPO 1997 04 19 18 27 84 6.2 -9 694.10 -56.0 -50.4 -56.2 60 -99 SPO 1997 04 19 18 28 85 6.1 -9 694.10 -56.0 -50.4 -56.1 59 -99 SPO 1997 04 19 18 29 84 6.0 -9 694.10 -56.0 -50.5 -56.1 59 -99 SPO 1997 04 19 18 30 83 6.0 -9 694.10 -56.0 -50.6 -56.0 61 -99 SPO 1997 04 19 18 31 82 6.1 -9 694.10 -55.9 -50.5 -56.0 60 -99 SPO 1997 04 19 18 32 82 6.2 -9 694.10 -55.8 -50.3 -55.9 60 -99 SPO 1997 04 19 18 33 84 6.2 -9 694.10 -55.8 -50.3 -55.8 61 -99 SPO 1997 04 19 18 34 86 6.2 -9 694.10 -55.7 -50.4 -55.7 61 -99 SPO 1997 04 19 18 35 86 6.2 -9 694.10 -55.7 -50.5 -55.8 61 -99 SPO 1997 04 19 18 36 86 6.2 -9 694.10 -55.7 -50.5 -55.8 61 -99 SPO 1997 04 19 18 37 87 6.1 -9 694.10 -55.6 -50.6 -55.8 61 -99 SPO 1997 04 19 18 38 87 6.2 -9 694.10 -55.8 -50.7 -55.9 62 -99 SPO 1997 04 19 18 39 85 6.2 -9 694.10 -55.8 -50.7 -56.0 61 -99 SPO 1997 04 19 18 40 85 6.2 -9 694.10 -55.8 -50.6 -56.0 61 -99 SPO 1997 04 19 18 41 84 6.2 -9 694.10 -55.9 -50.5 -56.1 61 -99 SPO 1997 04 19 18 42 84 6.1 -9 694.00 -56.0 -50.3 -56.1 61 -99 SPO 1997 04 19 18 43 86 6.0 -9 694.00 -56.1 -50.4 -56.3 61 -99 SPO 1997 04 19 18 44 88 5.8 -9 694.00 -56.3 -50.4 -56.6 61 -99 SPO 1997 04 19 18 45 91 5.8 -9 694.00 -56.6 -50.6 -56.7 62 -99 SPO 1997 04 19 18 46 92 5.8 -9 694.00 -56.6 -50.8 -56.6 62 -99 SPO 1997 04 19 18 47 93 6.0 -9 694.00 -56.5 -51.0 -56.4 61 -99 SPO 1997 04 19 18 48 93 6.0 -9 694.00 -56.4 -51.2 -56.3 61 -99 SPO 1997 04 19 18 49 93 6.1 -9 694.00 -56.3 -51.1 -56.2 61 -99 SPO 1997 04 19 18 50 91 6.1 -9 694.00 -56.2 -51.1 -56.2 60 -99 SPO 1997 04 19 18 51 91 6.0 -9 694.00 -56.2 -50.9 -56.2 60 -99 SPO 1997 04 19 18 52 92 6.0 -9 694.00 -56.2 -50.8 -56.3 60 -99 SPO 1997 04 19 18 53 91 6.0 -9 694.00 -56.3 -50.8 -56.5 60 -99 SPO 1997 04 19 18 54 90 5.9 -9 694.00 -56.5 -50.8 -56.8 61 -99 SPO 1997 04 19 18 55 92 5.7 -9 694.00 -56.7 -50.8 -56.9 61 -99 SPO 1997 04 19 18 56 93 5.7 -9 694.00 -56.8 -50.6 -56.8 61 -99 SPO 1997 04 19 18 57 93 5.8 -9 694.00 -56.7 -50.8 -56.7 61 -99 SPO 1997 04 19 18 58 93 5.9 -9 694.00 -56.6 -50.8 -56.5 60 -99 SPO 1997 04 19 18 59 94 5.9 -9 694.00 -56.4 -50.9 -56.2 61 -99 SPO 1997 04 19 19 00 96 5.9 -9 694.00 -56.1 -51.0 -55.9 60 0 SPO 1997 04 19 19 01 96 5.8 -9 694.00 -55.9 -51.1 -55.8 59 -99 SPO 1997 04 19 19 02 96 5.8 -9 693.90 -55.8 -51.1 -55.8 58 -99 SPO 1997 04 19 19 03 96 5.9 -9 693.90 -55.9 -51.0 -55.9 60 -99 SPO 1997 04 19 19 04 94 6.0 -9 693.90 -55.9 -51.2 -55.9 60 -99 SPO 1997 04 19 19 05 95 5.9 -9 693.90 -55.8 -51.1 -56.0 59 -99 SPO 1997 04 19 19 06 92 5.9 -9 693.90 -56.0 -51.0 -56.1 60 -99 SPO 1997 04 19 19 07 90 6.0 -9 693.90 -56.1 -51.0 -56.2 61 -99 SPO 1997 04 19 19 08 90 6.0 -9 693.90 -56.1 -51.0 -56.2 60 -99 SPO 1997 04 19 19 09 90 6.0 -9 693.90 -56.2 -50.8 -56.2 61 -99 SPO 1997 04 19 19 10 90 6.0 -9 693.90 -56.2 -50.8 -56.2 61 -99 SPO 1997 04 19 19 11 89 5.9 -9 693.90 -56.1 -50.8 -56.2 61 -99 SPO 1997 04 19 19 12 89 5.9 -9 693.90 -56.0 -50.7 -56.1 61 -99 SPO 1997 04 19 19 13 89 5.9 -9 693.90 -56.0 -50.7 -56.1 60 -99 SPO 1997 04 19 19 14 88 5.9 -9 693.90 -56.0 -50.6 -56.0 60 -99 SPO 1997 04 19 19 15 88 5.8 -9 693.90 -56.0 -50.7 -56.0 60 -99 SPO 1997 04 19 19 16 88 5.8 -9 693.90 -56.0 -50.7 -56.0 61 -99 SPO 1997 04 19 19 17 87 5.8 -9 693.90 -55.9 -50.7 -55.9 61 -99 SPO 1997 04 19 19 18 87 5.9 -9 693.90 -55.8 -50.6 -55.8 61 -99 SPO 1997 04 19 19 19 86 6.1 -9 693.90 -55.8 -50.6 -55.6 61 -99 SPO 1997 04 19 19 20 85 6.1 -9 693.90 -55.6 -50.6 -55.6 61 -99 SPO 1997 04 19 19 21 85 6.2 -9 693.90 -55.4 -50.4 -55.4 61 -99 SPO 1997 04 19 19 22 85 6.2 -9 693.90 -55.4 -50.4 -55.4 61 -99 SPO 1997 04 19 19 23 85 6.1 -9 693.90 -55.4 -50.4 -55.4 62 -99 SPO 1997 04 19 19 24 84 6.0 -9 693.90 -55.4 -50.5 -55.6 61 -99 SPO 1997 04 19 19 25 84 5.8 -9 693.90 -55.5 -50.5 -55.6 62 -99 SPO 1997 04 19 19 26 84 5.9 -9 693.90 -55.6 -50.4 -55.8 61 -99 SPO 1997 04 19 19 27 83 5.9 -9 693.90 -55.8 -50.5 -55.9 62 -99 SPO 1997 04 19 19 28 81 5.7 -9 693.90 -55.8 -50.5 -55.8 61 -99 SPO 1997 04 19 19 29 80 5.8 -9 693.90 -55.7 -50.5 -55.8 61 -99 SPO 1997 04 19 19 30 78 5.9 -9 693.90 -55.6 -50.3 -55.6 61 -99 SPO 1997 04 19 19 31 78 5.8 -9 693.80 -55.5 -50.2 -55.6 62 -99 SPO 1997 04 19 19 32 77 5.5 -9 693.80 -55.5 -50.2 -55.5 62 -99 SPO 1997 04 19 19 33 76 5.7 -9 693.80 -55.5 -50.3 -55.6 62 -99 SPO 1997 04 19 19 34 76 5.8 -9 693.80 -55.4 -50.3 -55.4 62 -99 SPO 1997 04 19 19 35 76 5.6 -9 693.90 -55.3 -50.3 -55.4 62 -99 SPO 1997 04 19 19 36 77 5.7 -9 693.90 -55.3 -50.3 -55.4 61 -99 SPO 1997 04 19 19 37 77 5.9 -9 693.80 -55.2 -50.3 -55.3 60 -99 SPO 1997 04 19 19 38 77 6.0 -9 693.80 -55.2 -50.3 -55.3 60 -99 SPO 1997 04 19 19 39 77 6.0 -9 693.80 -55.2 -50.3 -55.2 60 -99 SPO 1997 04 19 19 40 78 6.1 -9 693.80 -55.2 -50.2 -55.2 61 -99 SPO 1997 04 19 19 41 78 6.0 -9 693.80 -55.1 -50.2 -55.1 61 -99 SPO 1997 04 19 19 42 78 5.9 -9 693.80 -55.0 -50.2 -55.1 61 -99 SPO 1997 04 19 19 43 78 6.0 -9 693.80 -55.1 -50.2 -55.2 62 -99 SPO 1997 04 19 19 44 78 6.1 -9 693.80 -55.1 -50.0 -55.2 62 -99 SPO 1997 04 19 19 45 77 6.2 -9 693.80 -55.1 -49.9 -55.2 62 -99 SPO 1997 04 19 19 46 78 6.0 -9 693.80 -55.2 -50.0 -55.2 63 -99 SPO 1997 04 19 19 47 78 6.3 -9 693.80 -55.2 -50.0 -55.3 62 -99 SPO 1997 04 19 19 48 78 6.3 -9 693.80 -55.1 -50.1 -55.2 61 -99 SPO 1997 04 19 19 49 79 6.3 -9 693.90 -55.2 -50.1 -55.2 61 -99 SPO 1997 04 19 19 50 79 6.3 -9 693.80 -55.2 -50.2 -55.2 61 -99 SPO 1997 04 19 19 51 81 6.3 -9 693.80 -55.2 -50.1 -55.2 61 -99 SPO 1997 04 19 19 52 81 6.3 -9 693.80 -55.2 -50.2 -55.2 62 -99 SPO 1997 04 19 19 53 82 6.4 -9 693.80 -55.1 -50.2 -55.1 63 -99 SPO 1997 04 19 19 54 81 6.4 -9 693.80 -55.1 -50.2 -55.1 63 -99 SPO 1997 04 19 19 55 81 6.4 -9 693.80 -55.0 -50.3 -55.0 64 -99 SPO 1997 04 19 19 56 81 6.4 -9 693.80 -54.9 -50.2 -54.8 63 -99 SPO 1997 04 19 19 57 80 6.3 -9 693.80 -54.9 -50.1 -54.9 64 -99 SPO 1997 04 19 19 58 80 6.2 -9 693.80 -54.9 -50.1 -55.0 64 -99 SPO 1997 04 19 19 59 80 6.3 -9 693.80 -54.9 -50.1 -55.0 63 -99 SPO 1997 04 19 20 00 79 6.3 -9 693.80 -54.9 -50.1 -55.0 63 0 SPO 1997 04 19 20 01 80 6.3 -9 693.80 -54.9 -50.0 -54.9 63 -99 SPO 1997 04 19 20 02 82 6.4 -9 693.80 -54.8 -49.9 -54.8 62 -99 SPO 1997 04 19 20 03 82 6.3 -9 693.80 -54.7 -50.1 -54.7 62 -99 SPO 1997 04 19 20 04 81 6.3 -9 693.80 -54.6 -50.1 -54.6 61 -99 SPO 1997 04 19 20 05 81 6.3 -9 693.80 -54.6 -50.1 -54.6 63 -99 SPO 1997 04 19 20 06 82 6.4 -9 693.70 -54.4 -50.1 -54.4 61 -99 SPO 1997 04 19 20 07 81 6.2 -9 693.70 -54.4 -50.2 -54.4 62 -99 SPO 1997 04 19 20 08 81 6.3 -9 693.70 -54.3 -50.2 -54.3 62 -99 SPO 1997 04 19 20 09 81 6.3 -9 693.70 -54.2 -50.2 -54.3 62 -99 SPO 1997 04 19 20 10 81 6.3 -9 693.70 -54.2 -50.2 -54.2 62 -99 SPO 1997 04 19 20 11 82 6.2 -9 693.70 -54.2 -50.3 -54.2 63 -99 SPO 1997 04 19 20 12 82 6.1 -9 693.70 -54.2 -50.3 -54.2 63 -99 SPO 1997 04 19 20 13 82 6.1 -9 693.70 -54.2 -50.4 -54.3 63 -99 SPO 1997 04 19 20 14 81 6.1 -9 693.70 -54.2 -50.4 -54.3 62 -99 SPO 1997 04 19 20 15 80 6.1 -9 693.70 -54.2 -50.3 -54.3 63 -99 SPO 1997 04 19 20 16 80 6.1 -9 693.70 -54.2 -50.2 -54.3 63 -99 SPO 1997 04 19 20 17 79 6.1 -9 693.70 -54.2 -50.2 -54.2 64 -99 SPO 1997 04 19 20 18 79 6.2 -9 693.70 -54.1 -50.1 -54.2 64 -99 SPO 1997 04 19 20 19 78 6.3 -9 693.60 -54.1 -50.2 -54.2 64 -99 SPO 1997 04 19 20 20 77 6.2 -9 693.60 -54.1 -50.2 -54.1 65 -99 SPO 1997 04 19 20 21 76 6.3 -9 693.60 -54.0 -50.2 -54.0 65 -99 SPO 1997 04 19 20 22 75 6.3 -9 693.60 -54.0 -50.1 -54.0 65 -99 SPO 1997 04 19 20 23 75 6.2 -9 693.60 -54.0 -50.1 -54.1 64 -99 SPO 1997 04 19 20 24 74 6.3 -9 693.60 -54.0 -50.1 -54.1 63 -99 SPO 1997 04 19 20 25 73 6.2 -9 693.60 -54.0 -50.1 -54.2 63 -99 SPO 1997 04 19 20 26 73 6.0 -9 693.60 -54.1 -50.2 -54.2 64 -99 SPO 1997 04 19 20 27 73 5.9 -9 693.60 -54.1 -50.2 -54.2 64 -99 SPO 1997 04 19 20 28 72 5.9 -9 693.50 -54.2 -50.1 -54.3 65 -99 SPO 1997 04 19 20 29 71 5.9 -9 693.50 -54.3 -50.2 -54.4 66 -99 SPO 1997 04 19 20 30 72 6.1 -9 693.50 -54.4 -50.0 -54.5 66 -99 SPO 1997 04 19 20 31 71 6.0 -9 693.50 -54.4 -50.0 -54.5 64 -99 SPO 1997 04 19 20 32 70 6.0 -9 693.60 -54.5 -49.9 -54.5 65 -99 SPO 1997 04 19 20 33 71 6.1 -9 693.60 -54.5 -50.0 -54.6 65 -99 SPO 1997 04 19 20 34 72 6.2 -9 693.50 -54.6 -49.9 -54.7 65 -99 SPO 1997 04 19 20 35 73 6.2 -9 693.50 -54.7 -49.9 -54.8 65 -99 SPO 1997 04 19 20 36 74 6.1 -9 693.50 -54.8 -49.9 -54.9 64 -99 SPO 1997 04 19 20 37 75 6.2 -9 693.50 -54.8 -49.9 -54.8 62 -99 SPO 1997 04 19 20 38 75 6.0 -9 693.50 -54.8 -50.0 -54.8 62 -99 SPO 1997 04 19 20 39 75 5.9 -9 693.50 -54.8 -50.1 -54.8 62 -99 SPO 1997 04 19 20 40 77 5.9 -9 693.50 -54.8 -50.2 -54.8 62 -99 SPO 1997 04 19 20 41 78 5.8 -9 693.50 -54.8 -50.2 -54.8 62 -99 SPO 1997 04 19 20 42 78 5.8 -9 693.50 -54.9 -50.3 -55.0 62 -99 SPO 1997 04 19 20 43 78 5.9 -9 693.50 -55.0 -50.3 -55.0 63 -99 SPO 1997 04 19 20 44 78 6.0 -9 693.50 -55.0 -50.3 -55.1 63 -99 SPO 1997 04 19 20 45 78 6.1 -9 693.50 -55.1 -50.0 -55.0 63 -99 SPO 1997 04 19 20 46 77 6.2 -9 693.50 -55.1 -50.0 -55.0 63 -99 SPO 1997 04 19 20 47 78 6.0 -9 693.50 -55.1 -50.0 -55.1 63 -99 SPO 1997 04 19 20 48 79 6.1 -9 693.50 -55.1 -50.1 -55.1 62 -99 SPO 1997 04 19 20 49 78 6.0 -9 693.50 -55.1 -50.1 -55.2 62 -99 SPO 1997 04 19 20 50 79 5.9 -9 693.50 -55.2 -50.1 -55.2 62 -99 SPO 1997 04 19 20 51 80 5.9 -9 693.50 -55.2 -50.2 -55.2 62 -99 SPO 1997 04 19 20 52 81 5.9 -9 693.50 -55.2 -50.2 -55.2 62 -99 SPO 1997 04 19 20 53 81 6.0 -9 693.50 -55.2 -50.1 -55.2 62 -99 SPO 1997 04 19 20 54 82 6.1 -9 693.50 -55.1 -50.1 -55.1 62 -99 SPO 1997 04 19 20 55 82 6.1 -9 693.50 -55.0 -50.0 -55.0 62 -99 SPO 1997 04 19 20 56 82 6.1 -9 693.50 -54.9 -50.0 -54.9 62 -99 SPO 1997 04 19 20 57 83 6.1 -9 693.50 -54.9 -50.1 -54.8 62 -99 SPO 1997 04 19 20 58 84 6.1 -9 693.40 -54.8 -50.3 -54.8 62 -99 SPO 1997 04 19 20 59 84 6.1 -9 693.40 -54.7 -50.4 -54.7 61 -99 SPO 1997 04 19 21 00 86 6.0 -9 693.40 -54.7 -50.5 -54.8 61 0 SPO 1997 04 19 21 01 89 5.7 -9 693.40 -54.7 -50.6 -54.8 62 -99 SPO 1997 04 19 21 02 89 5.7 -9 693.40 -54.7 -50.6 -54.8 62 -99 SPO 1997 04 19 21 03 88 5.9 -9 693.40 -54.8 -50.6 -54.9 62 -99 SPO 1997 04 19 21 04 87 6.0 -9 693.40 -54.8 -50.6 -54.8 61 -99 SPO 1997 04 19 21 05 85 6.2 -9 693.40 -54.7 -50.5 -54.6 61 -99 SPO 1997 04 19 21 06 84 6.2 -9 693.40 -54.6 -50.4 -54.6 61 -99 SPO 1997 04 19 21 07 83 6.3 -9 693.30 -54.5 -50.3 -54.6 60 -99 SPO 1997 04 19 21 08 83 6.1 -9 693.30 -54.5 -50.3 -54.6 62 -99 SPO 1997 04 19 21 09 84 6.0 -9 693.30 -54.5 -50.4 -54.6 62 -99 SPO 1997 04 19 21 10 86 5.9 -9 693.30 -54.6 -50.4 -54.8 63 -99 SPO 1997 04 19 21 11 87 5.9 -9 693.30 -54.7 -50.5 -54.8 62 -99 SPO 1997 04 19 21 12 87 6.0 -9 693.30 -54.7 -50.5 -54.8 62 -99 SPO 1997 04 19 21 13 87 6.2 -9 693.30 -54.7 -50.4 -54.7 62 -99 SPO 1997 04 19 21 14 86 6.3 -9 693.30 -54.6 -50.4 -54.6 61 -99 SPO 1997 04 19 21 15 85 6.3 -9 693.30 -54.6 -50.5 -54.6 63 -99 SPO 1997 04 19 21 16 85 6.2 -9 693.30 -54.5 -50.6 -54.5 62 -99 SPO 1997 04 19 21 17 87 6.0 -9 693.20 -54.6 -50.7 -54.6 63 -99 SPO 1997 04 19 21 18 88 5.9 -9 693.20 -54.6 -50.7 -54.8 63 -99 SPO 1997 04 19 21 19 88 6.2 -9 693.20 -54.8 -50.7 -55.0 62 -99 SPO 1997 04 19 21 20 88 6.1 -9 693.20 -54.9 -50.7 -55.0 63 -99 SPO 1997 04 19 21 21 86 6.1 -9 693.20 -54.9 -50.6 -54.9 62 -99 SPO 1997 04 19 21 22 86 6.2 -9 693.30 -54.8 -50.5 -54.9 61 -99 SPO 1997 04 19 21 23 87 6.1 -9 693.20 -54.8 -50.5 -54.9 61 -99 SPO 1997 04 19 21 24 87 6.0 -9 693.20 -54.8 -50.6 -54.9 61 -99 SPO 1997 04 19 21 25 86 6.2 -9 693.20 -54.8 -50.6 -54.8 61 -99 SPO 1997 04 19 21 26 84 6.4 -9 693.20 -54.8 -50.4 -54.8 62 -99 SPO 1997 04 19 21 27 84 6.4 -9 693.20 -54.7 -50.3 -54.6 62 -99 SPO 1997 04 19 21 28 84 6.4 -9 693.20 -54.6 -50.3 -54.5 63 -99 SPO 1997 04 19 21 29 86 6.5 -9 693.20 -54.5 -50.3 -54.6 63 -99 SPO 1997 04 19 21 30 86 6.4 -9 693.20 -54.5 -50.2 -54.5 63 -99 SPO 1997 04 19 21 31 87 6.5 -9 693.20 -54.4 -50.3 -54.5 62 -99 SPO 1997 04 19 21 32 88 6.6 -9 693.20 -54.4 -50.4 -54.6 62 -99 SPO 1997 04 19 21 33 86 6.6 -9 693.20 -54.4 -50.6 -54.5 62 -99 SPO 1997 04 19 21 34 87 6.4 -9 693.20 -54.4 -50.7 -54.5 62 -99 SPO 1997 04 19 21 35 88 6.2 -9 693.20 -54.4 -50.7 -54.6 62 -99 SPO 1997 04 19 21 36 88 6.3 -9 693.20 -54.6 -50.7 -54.8 63 -99 SPO 1997 04 19 21 37 86 6.4 -9 693.20 -54.9 -50.6 -55.2 63 -99 SPO 1997 04 19 21 38 85 6.4 -9 693.20 -55.2 -50.7 -55.3 64 -99 SPO 1997 04 19 21 39 85 6.5 -9 693.20 -55.3 -50.6 -55.4 64 -99 SPO 1997 04 19 21 40 85 6.2 -9 693.20 -55.5 -50.6 -55.6 65 -99 SPO 1997 04 19 21 41 86 6.2 -9 693.20 -55.7 -50.7 -55.7 65 -99 SPO 1997 04 19 21 42 85 6.6 -9 693.20 -55.7 -50.7 -55.6 65 -99 SPO 1997 04 19 21 43 84 6.7 -9 693.20 -55.5 -50.7 -55.4 63 -99 SPO 1997 04 19 21 44 84 6.8 -9 693.20 -55.3 -50.6 -55.2 62 -99 SPO 1997 04 19 21 45 83 7.2 -9 693.20 -55.1 -50.5 -54.9 62 -99 SPO 1997 04 19 21 46 81 7.2 -9 693.10 -54.8 -50.4 -54.6 61 -99 SPO 1997 04 19 21 47 80 7.1 -9 693.10 -54.6 -50.4 -54.5 60 -99 SPO 1997 04 19 21 48 81 6.9 -9 693.20 -54.4 -50.4 -54.4 60 -99 SPO 1997 04 19 21 49 81 6.7 -9 693.20 -54.4 -50.4 -54.4 61 -99 SPO 1997 04 19 21 50 82 6.8 -9 693.20 -54.4 -50.4 -54.5 62 -99 SPO 1997 04 19 21 51 83 6.7 -9 693.20 -54.4 -50.4 -54.5 63 -99 SPO 1997 04 19 21 52 84 6.7 -9 693.20 -54.4 -50.5 -54.6 62 -99 SPO 1997 04 19 21 53 85 6.5 -9 693.20 -54.4 -50.5 -54.6 62 -99 SPO 1997 04 19 21 54 85 6.5 -9 693.10 -54.5 -50.6 -54.6 63 -99 SPO 1997 04 19 21 55 86 6.7 -9 693.20 -54.5 -50.6 -54.6 63 -99 SPO 1997 04 19 21 56 86 6.7 -9 693.20 -54.5 -50.5 -54.6 62 -99 SPO 1997 04 19 21 57 86 6.7 -9 693.20 -54.5 -50.5 -54.6 61 -99 SPO 1997 04 19 21 58 86 6.5 -9 693.20 -54.5 -50.6 -54.6 61 -99 SPO 1997 04 19 21 59 87 6.5 -9 693.20 -54.5 -50.6 -54.6 61 -99 SPO 1997 04 19 22 00 88 6.5 -9 693.10 -54.6 -50.6 -54.7 62 0 SPO 1997 04 19 22 01 89 6.3 -9 693.20 -54.7 -50.7 -54.8 62 -99 SPO 1997 04 19 22 02 89 6.3 -9 693.20 -54.8 -50.7 -54.9 62 -99 SPO 1997 04 19 22 03 89 6.3 -9 693.20 -54.9 -50.7 -55.1 62 -99 SPO 1997 04 19 22 04 90 6.2 -9 693.20 -55.0 -50.7 -55.1 62 -99 SPO 1997 04 19 22 05 89 6.3 -9 693.10 -55.1 -50.8 -55.2 62 -99 SPO 1997 04 19 22 06 89 6.2 -9 693.20 -55.1 -50.8 -55.1 62 -99 SPO 1997 04 19 22 07 89 6.2 -9 693.20 -55.0 -50.8 -55.0 62 -99 SPO 1997 04 19 22 08 89 6.1 -9 693.20 -54.9 -50.8 -54.8 62 -99 SPO 1997 04 19 22 09 88 5.8 -9 693.20 -54.8 -50.8 -54.7 61 -99 SPO 1997 04 19 22 10 89 6.0 -9 693.20 -54.8 -50.8 -54.7 61 -99 SPO 1997 04 19 22 11 89 5.9 -9 693.10 -54.7 -50.8 -54.7 60 -99 SPO 1997 04 19 22 12 88 5.8 -9 693.20 -54.7 -50.7 -54.8 60 -99 SPO 1997 04 19 22 13 90 5.8 -9 693.20 -54.7 -50.7 -54.8 61 -99 SPO 1997 04 19 22 14 91 5.7 -9 693.20 -54.7 -50.7 -54.8 61 -99 SPO 1997 04 19 22 15 92 5.5 -9 693.20 -54.8 -50.8 -54.9 62 -99 SPO 1997 04 19 22 16 92 5.5 -9 693.20 -54.9 -50.8 -55.1 62 -99 SPO 1997 04 19 22 17 92 5.5 -9 693.20 -55.0 -50.9 -55.1 62 -99 SPO 1997 04 19 22 18 91 5.6 -9 693.20 -55.1 -50.9 -55.1 63 -99 SPO 1997 04 19 22 19 90 5.7 -9 693.20 -55.0 -50.9 -55.0 62 -99 SPO 1997 04 19 22 20 89 5.7 -9 693.20 -55.0 -50.8 -55.0 61 -99 SPO 1997 04 19 22 21 87 5.6 -9 693.20 -54.9 -50.8 -54.9 60 -99 SPO 1997 04 19 22 22 87 5.6 -9 693.20 -54.9 -50.8 -54.9 61 -99 SPO 1997 04 19 22 23 87 5.6 -9 693.20 -54.9 -50.8 -54.9 61 -99 SPO 1997 04 19 22 24 89 5.6 -9 693.20 -54.9 -50.8 -54.9 61 -99 SPO 1997 04 19 22 25 91 5.5 -9 693.20 -54.9 -50.9 -54.9 61 -99 SPO 1997 04 19 22 26 92 5.7 -9 693.20 -54.9 -50.9 -55.0 61 -99 SPO 1997 04 19 22 27 93 5.7 -9 693.20 -55.0 -51.0 -55.1 62 -99 SPO 1997 04 19 22 28 93 5.8 -9 693.20 -55.0 -50.9 -55.0 61 -99 SPO 1997 04 19 22 29 91 5.9 -9 693.20 -54.9 -50.9 -55.0 61 -99 SPO 1997 04 19 22 30 90 5.9 -9 693.20 -54.8 -50.9 -54.8 61 -99 SPO 1997 04 19 22 31 88 6.0 -9 693.20 -54.8 -50.8 -54.8 62 -99 SPO 1997 04 19 22 32 87 5.8 -9 693.20 -54.6 -50.8 -54.6 61 -99 SPO 1997 04 19 22 33 87 6.0 -9 693.20 -54.6 -50.7 -54.6 61 -99 SPO 1997 04 19 22 34 89 5.8 -9 693.20 -54.4 -50.8 -54.5 60 -99 SPO 1997 04 19 22 35 89 5.8 -9 693.20 -54.4 -50.8 -54.5 61 -99 SPO 1997 04 19 22 36 91 5.5 -9 693.20 -54.4 -50.8 -54.5 62 -99 SPO 1997 04 19 22 37 90 5.0 -9 693.20 -54.4 -51.0 -54.6 62 -99 SPO 1997 04 19 22 38 93 5.3 -9 693.20 -54.6 -51.2 -54.7 63 -99 SPO 1997 04 19 22 39 92 5.5 -9 693.20 -54.7 -51.1 -54.8 63 -99 SPO 1997 04 19 22 40 88 5.6 -9 693.10 -54.8 -51.1 -54.9 64 -99 SPO 1997 04 19 22 41 87 5.7 -9 693.20 -54.7 -51.0 -54.8 63 -99 SPO 1997 04 19 22 42 86 5.7 -9 693.10 -54.6 -51.0 -54.6 63 -99 SPO 1997 04 19 22 43 85 5.6 -9 693.20 -54.6 -51.0 -54.6 62 -99 SPO 1997 04 19 22 44 85 5.6 -9 693.10 -54.6 -51.0 -54.7 62 -99 SPO 1997 04 19 22 45 84 5.6 -9 693.20 -54.6 -51.0 -54.7 61 -99 SPO 1997 04 19 22 46 85 5.6 -9 693.20 -54.6 -50.9 -54.6 61 -99 SPO 1997 04 19 22 47 84 5.6 -9 693.10 -54.6 -50.9 -54.7 60 -99 SPO 1997 04 19 22 48 83 5.5 -9 693.10 -54.6 -50.9 -54.7 61 -99 SPO 1997 04 19 22 49 83 5.6 -9 693.10 -54.6 -50.8 -54.7 61 -99 SPO 1997 04 19 22 50 82 5.6 -9 693.10 -54.6 -50.8 -54.8 62 -99 SPO 1997 04 19 22 51 81 5.7 -9 693.10 -54.7 -50.8 -54.8 62 -99 SPO 1997 04 19 22 52 83 5.7 -9 693.10 -54.7 -50.7 -54.7 62 -99 SPO 1997 04 19 22 53 83 5.7 -9 693.10 -54.7 -50.8 -54.8 62 -99 SPO 1997 04 19 22 54 85 5.6 -9 693.10 -54.7 -51.0 -54.8 62 -99 SPO 1997 04 19 22 55 86 5.8 -9 693.10 -54.7 -51.0 -54.7 62 -99 SPO 1997 04 19 22 56 85 5.7 -9 693.10 -54.7 -51.0 -54.7 61 -99 SPO 1997 04 19 22 57 85 5.8 -9 693.00 -54.6 -51.0 -54.7 61 -99 SPO 1997 04 19 22 58 85 5.8 -9 693.00 -54.6 -51.0 -54.7 60 -99 SPO 1997 04 19 22 59 85 5.9 -9 693.00 -54.6 -51.0 -54.7 60 -99 SPO 1997 04 19 23 00 85 5.7 -9 693.10 -54.6 -51.0 -54.7 61 0 SPO 1997 04 19 23 01 85 5.7 -9 693.10 -54.6 -51.1 -54.7 62 -99 SPO 1997 04 19 23 02 84 5.6 -9 693.10 -54.6 -51.1 -54.6 62 -99 SPO 1997 04 19 23 03 83 5.4 -9 693.10 -54.6 -51.1 -54.6 62 -99 SPO 1997 04 19 23 04 84 5.3 -9 693.10 -54.6 -51.2 -54.6 62 -99 SPO 1997 04 19 23 05 84 5.2 -9 693.10 -54.6 -51.2 -54.7 61 -99 SPO 1997 04 19 23 06 83 5.1 -9 693.10 -54.6 -51.2 -54.8 61 -99 SPO 1997 04 19 23 07 82 5.1 -9 693.10 -54.7 -51.3 -54.8 60 -99 SPO 1997 04 19 23 08 82 5.2 -9 693.10 -54.8 -51.3 -54.8 61 -99 SPO 1997 04 19 23 09 82 5.1 -9 693.10 -54.8 -51.3 -54.8 61 -99 SPO 1997 04 19 23 10 82 5.2 -9 693.00 -54.8 -51.2 -54.8 61 -99 SPO 1997 04 19 23 11 80 5.3 -9 693.00 -54.8 -51.2 -54.8 61 -99 SPO 1997 04 19 23 12 77 5.1 -9 693.00 -54.8 -51.2 -54.8 62 -99 SPO 1997 04 19 23 13 75 5.1 -9 693.00 -54.8 -51.2 -54.7 62 -99 SPO 1997 04 19 23 14 77 5.1 -9 693.00 -54.6 -51.2 -54.6 61 -99 SPO 1997 04 19 23 15 79 5.2 -9 693.00 -54.6 -51.3 -54.6 61 -99 SPO 1997 04 19 23 16 80 5.0 -9 693.00 -54.6 -51.3 -54.6 62 -99 SPO 1997 04 19 23 17 80 4.9 -9 693.00 -54.7 -51.2 -54.8 62 -99 SPO 1997 04 19 23 18 81 4.9 -9 693.00 -54.7 -51.3 -54.8 62 -99 SPO 1997 04 19 23 19 81 4.8 -9 693.00 -54.7 -51.3 -54.8 61 -99 SPO 1997 04 19 23 20 80 5.0 -9 693.00 -54.8 -51.2 -54.9 61 -99 SPO 1997 04 19 23 21 79 5.1 -9 693.00 -54.9 -51.0 -55.0 61 -99 SPO 1997 04 19 23 22 79 5.4 -9 693.00 -55.0 -51.0 -55.0 61 -99 SPO 1997 04 19 23 23 80 5.3 -9 693.00 -55.0 -51.0 -55.0 61 -99 SPO 1997 04 19 23 24 79 5.4 -9 693.00 -55.0 -50.9 -55.0 61 -99 SPO 1997 04 19 23 25 80 5.4 -9 693.00 -55.0 -50.9 -55.0 61 -99 SPO 1997 04 19 23 26 79 5.3 -9 693.00 -54.9 -50.9 -55.0 62 -99 SPO 1997 04 19 23 27 79 5.4 -9 692.90 -54.9 -50.9 -55.0 62 -99 SPO 1997 04 19 23 28 80 5.6 -9 692.90 -55.0 -50.8 -55.0 62 -99 SPO 1997 04 19 23 29 79 5.8 -9 692.90 -54.9 -50.8 -55.0 62 -99 SPO 1997 04 19 23 30 79 5.9 -9 692.80 -54.9 -50.9 -54.9 62 -99 SPO 1997 04 19 23 31 80 6.0 -9 692.80 -54.8 -50.9 -54.8 62 -99 SPO 1997 04 19 23 32 81 5.8 -9 692.80 -54.7 -51.0 -54.7 62 -99 SPO 1997 04 19 23 33 83 5.7 -9 692.80 -54.6 -51.1 -54.7 61 -99 SPO 1997 04 19 23 34 83 6.2 -9 692.80 -54.7 -51.0 -54.7 62 -99 SPO 1997 04 19 23 35 81 6.4 -9 692.80 -54.7 -51.0 -54.7 62 -99 SPO 1997 04 19 23 36 78 6.3 -9 692.80 -54.6 -50.8 -54.6 62 -99 SPO 1997 04 19 23 37 79 6.3 -9 692.80 -54.6 -50.8 -54.6 63 -99 SPO 1997 04 19 23 38 80 6.2 -9 692.80 -54.4 -50.8 -54.5 61 -99 SPO 1997 04 19 23 39 80 6.2 -9 692.80 -54.4 -50.8 -54.4 63 -99 SPO 1997 04 19 23 40 79 5.9 -9 692.80 -54.3 -50.8 -54.4 62 -99 SPO 1997 04 19 23 41 78 6.1 -9 692.80 -54.3 -50.8 -54.5 63 -99 SPO 1997 04 19 23 42 79 6.0 -9 692.70 -54.3 -50.9 -54.4 63 -99 SPO 1997 04 19 23 43 78 6.0 -9 692.70 -54.3 -50.9 -54.4 62 -99 SPO 1997 04 19 23 44 79 5.7 -9 692.70 -54.2 -50.9 -54.4 61 -99 SPO 1997 04 19 23 45 79 5.7 -9 692.70 -54.2 -51.0 -54.3 61 -99 SPO 1997 04 19 23 46 80 5.6 -9 692.70 -54.1 -51.1 -54.3 60 -99 SPO 1997 04 19 23 47 81 5.7 -9 692.70 -54.2 -51.2 -54.3 63 -99 SPO 1997 04 19 23 48 81 5.5 -9 692.70 -54.2 -51.3 -54.3 63 -99 SPO 1997 04 19 23 49 82 5.7 -9 692.70 -54.2 -51.4 -54.4 63 -99 SPO 1997 04 19 23 50 82 5.8 -9 692.70 -54.3 -51.3 -54.4 63 -99 SPO 1997 04 19 23 51 81 5.8 -9 692.70 -54.3 -51.2 -54.4 63 -99 SPO 1997 04 19 23 52 81 5.8 -9 692.70 -54.3 -51.2 -54.4 63 -99 SPO 1997 04 19 23 53 81 5.5 -9 692.70 -54.2 -51.3 -54.3 63 -99 SPO 1997 04 19 23 54 83 5.4 -9 692.70 -54.2 -51.4 -54.3 62 -99 SPO 1997 04 19 23 55 83 5.4 -9 692.80 -54.2 -51.4 -54.4 62 -99 SPO 1997 04 19 23 56 85 5.4 -9 692.80 -54.2 -51.4 -54.4 62 -99 SPO 1997 04 19 23 57 84 5.3 -9 692.70 -54.3 -51.6 -54.4 63 -99 SPO 1997 04 19 23 58 83 5.6 -9 692.80 -54.2 -51.6 -54.4 -99 -99 SPO 1997 04 19 23 59 83 5.9 -9 692.70 -54.2 -51.4 -54.2 -99 -99 SPO 1997 04 20 00 00 81 5.4 -9 692.70 -54.0 -51.5 -54.1 -99 0 SPO 1997 04 20 00 01 80 5.6 -9 692.70 -54.0 -51.6 -54.2 -99 -99 SPO 1997 04 20 00 02 79 5.8 -9 692.70 -54.0 -51.5 -54.2 -99 -99 SPO 1997 04 20 00 03 79 6.0 -9 692.70 -54.0 -51.5 -54.1 -99 -99 SPO 1997 04 20 00 04 79 5.9 -9 692.70 -54.0 -51.5 -54.1 -99 -99 SPO 1997 04 20 00 05 80 5.8 -9 692.70 -54.0 -51.5 -54.1 -99 -99 SPO 1997 04 20 00 06 79 5.8 -9 692.70 -54.0 -51.5 -54.1 -99 -99 SPO 1997 04 20 00 07 78 6.0 -9 692.70 -54.0 -51.4 -54.1 -99 -99 SPO 1997 04 20 00 08 77 6.1 -9 692.70 -54.0 -51.2 -54.1 -99 -99 SPO 1997 04 20 00 09 77 6.1 -9 692.70 -54.0 -51.2 -54.1 -99 -99 SPO 1997 04 20 00 10 76 6.1 -9 692.70 -54.0 -51.3 -54.1 -99 -99 SPO 1997 04 20 00 11 76 6.2 -9 692.70 -53.9 -51.3 -54.0 -99 -99 SPO 1997 04 20 00 12 77 6.2 -9 692.60 -53.9 -51.3 -54.0 -99 -99 SPO 1997 04 20 00 13 77 6.3 -9 692.60 -53.8 -51.2 -53.9 63 -99 SPO 1997 04 20 00 14 77 6.1 -9 692.60 -53.8 -51.2 -53.9 63 -99 SPO 1997 04 20 00 15 78 6.1 -9 692.60 -53.8 -51.2 -53.9 64 -99 SPO 1997 04 20 00 16 78 6.1 -9 692.60 -53.8 -51.2 -54.0 65 -99 SPO 1997 04 20 00 17 76 6.1 -9 692.60 -53.9 -51.2 -54.0 66 -99 SPO 1997 04 20 00 18 76 5.8 -9 692.60 -53.9 -51.3 -54.0 65 -99 SPO 1997 04 20 00 19 75 5.5 -9 692.60 -53.9 -51.3 -54.0 63 -99 SPO 1997 04 20 00 20 75 5.5 -9 692.60 -53.9 -51.4 -54.0 63 -99 SPO 1997 04 20 00 21 73 5.4 -9 692.60 -53.9 -51.5 -54.0 63 -99 SPO 1997 04 20 00 22 75 5.3 -9 692.60 -53.9 -51.5 -54.0 63 -99 SPO 1997 04 20 00 23 71 5.3 -9 692.60 -53.8 -51.5 -53.9 63 -99 SPO 1997 04 20 00 24 73 5.3 -9 692.60 -53.8 -51.5 -54.0 64 -99 SPO 1997 04 20 00 25 74 5.4 -9 692.60 -53.9 -51.4 -54.0 65 -99 SPO 1997 04 20 00 26 73 5.3 -9 692.60 -53.9 -51.4 -54.0 65 -99 SPO 1997 04 20 00 27 74 5.3 -9 692.60 -53.8 -51.5 -54.0 64 -99 SPO 1997 04 20 00 28 74 5.3 -9 692.60 -53.9 -51.4 -54.0 65 -99 SPO 1997 04 20 00 29 75 5.1 -9 692.50 -53.9 -51.4 -54.0 65 -99 SPO 1997 04 20 00 30 74 4.8 -9 692.60 -53.9 -51.5 -54.0 63 -99 SPO 1997 04 20 00 31 74 4.8 -9 692.60 -53.9 -51.5 -54.0 63 -99 SPO 1997 04 20 00 32 74 4.8 -9 692.60 -53.9 -51.6 -54.0 63 -99 SPO 1997 04 20 00 33 76 5.3 -9 692.60 -54.0 -51.5 -54.1 63 -99 SPO 1997 04 20 00 34 76 5.5 -9 692.50 -54.0 -51.4 -54.1 63 -99 SPO 1997 04 20 00 35 76 5.6 -9 692.50 -54.0 -51.4 -54.0 63 -99 SPO 1997 04 20 00 36 74 5.7 -9 692.50 -53.9 -51.4 -54.0 63 -99 SPO 1997 04 20 00 37 74 5.6 -9 692.50 -53.9 -51.4 -54.0 63 -99 SPO 1997 04 20 00 38 74 5.5 -9 692.50 -53.9 -51.4 -54.0 63 -99 SPO 1997 04 20 00 39 74 5.2 -9 692.50 -54.0 -51.5 -54.1 64 -99 SPO 1997 04 20 00 40 73 5.4 -9 692.50 -54.0 -51.5 -54.1 64 -99 SPO 1997 04 20 00 41 73 5.2 -9 692.50 -54.0 -51.4 -54.0 63 -99 SPO 1997 04 20 00 42 73 5.0 -9 692.50 -54.0 -51.4 -54.1 63 -99 SPO 1997 04 20 00 43 73 5.0 -9 692.50 -54.0 -51.3 -54.1 63 -99 SPO 1997 04 20 00 44 76 4.7 -9 692.50 -54.0 -51.5 -54.2 62 -99 SPO 1997 04 20 00 45 76 4.7 -9 692.50 -54.1 -51.5 -54.2 63 -99 SPO 1997 04 20 00 46 76 4.8 -9 692.50 -54.2 -51.5 -54.3 63 -99 SPO 1997 04 20 00 47 76 4.9 -9 692.50 -54.2 -51.5 -54.2 64 -99 SPO 1997 04 20 00 48 76 5.2 -9 692.50 -54.1 -51.5 -54.2 65 -99 SPO 1997 04 20 00 49 76 5.6 -9 692.40 -54.1 -51.4 -54.2 65 -99 SPO 1997 04 20 00 50 76 5.7 -9 692.40 -54.1 -51.3 -54.1 65 -99 SPO 1997 04 20 00 51 75 5.5 -9 692.40 -54.0 -51.3 -54.2 64 -99 SPO 1997 04 20 00 52 74 5.5 -9 692.40 -54.1 -51.4 -54.2 65 -99 SPO 1997 04 20 00 53 75 5.9 -9 692.30 -54.1 -51.4 -54.2 63 -99 SPO 1997 04 20 00 54 74 5.8 -9 692.30 -54.1 -51.4 -54.2 63 -99 SPO 1997 04 20 00 55 75 5.7 -9 692.40 -54.1 -51.5 -54.2 63 -99 SPO 1997 04 20 00 56 75 5.5 -9 692.30 -54.1 -51.6 -54.2 63 -99 SPO 1997 04 20 00 57 74 5.3 -9 692.30 -54.2 -51.6 -54.3 63 -99 SPO 1997 04 20 00 58 75 5.3 -9 692.30 -54.2 -51.7 -54.3 63 -99 SPO 1997 04 20 00 59 78 5.4 -9 692.30 -54.2 -51.8 -54.3 63 -99 SPO 1997 04 20 01 00 78 5.2 -9 692.30 -54.3 -51.8 -54.4 64 0 SPO 1997 04 20 01 01 79 5.0 -9 692.30 -54.3 -51.8 -54.4 64 -99 SPO 1997 04 20 01 02 81 5.2 -9 692.30 -54.4 -51.8 -54.5 65 -99 SPO 1997 04 20 01 03 81 5.6 -9 692.30 -54.4 -51.8 -54.5 65 -99 SPO 1997 04 20 01 04 83 5.9 -9 692.30 -54.4 -51.7 -54.5 65 -99 SPO 1997 04 20 01 05 83 5.8 -9 692.30 -54.5 -51.6 -54.5 64 -99 SPO 1997 04 20 01 06 83 6.0 -9 692.30 -54.5 -51.6 -54.5 63 -99 SPO 1997 04 20 01 07 84 6.1 -9 692.30 -54.5 -51.6 -54.6 62 -99 SPO 1997 04 20 01 08 84 6.0 -9 692.30 -54.6 -51.6 -54.6 63 -99 SPO 1997 04 20 01 09 84 6.1 -9 692.20 -54.6 -51.6 -54.6 63 -99 SPO 1997 04 20 01 10 84 6.1 -9 692.20 -54.5 -51.7 -54.6 62 -99 SPO 1997 04 20 01 11 85 6.0 -9 692.20 -54.5 -51.8 -54.6 62 -99 SPO 1997 04 20 01 12 85 6.0 -9 692.20 -54.6 -51.8 -54.7 63 -99 SPO 1997 04 20 01 13 85 6.0 -9 692.20 -54.6 -51.9 -54.7 63 -99 SPO 1997 04 20 01 14 85 5.8 -9 692.20 -54.7 -52.0 -54.8 63 -99 SPO 1997 04 20 01 15 87 5.8 -9 692.20 -54.8 -52.2 -54.9 64 -99 SPO 1997 04 20 01 16 89 6.0 -9 692.20 -54.8 -52.2 -54.9 64 -99 SPO 1997 04 20 01 17 89 6.0 -9 692.10 -54.9 -52.3 -54.9 63 -99 SPO 1997 04 20 01 18 89 6.4 -9 692.10 -54.8 -52.2 -54.8 62 -99 SPO 1997 04 20 01 19 90 6.4 -9 692.10 -54.7 -52.3 -54.7 62 -99 SPO 1997 04 20 01 20 90 6.2 -9 692.10 -54.6 -52.3 -54.6 63 -99 SPO 1997 04 20 01 21 91 6.2 -9 692.10 -54.6 -52.3 -54.6 63 -99 SPO 1997 04 20 01 22 90 6.3 -9 692.00 -54.6 -52.3 -54.6 63 -99 SPO 1997 04 20 01 23 89 6.4 -9 692.00 -54.6 -52.2 -54.6 63 -99 SPO 1997 04 20 01 24 90 6.3 -9 692.00 -54.5 -52.2 -54.5 63 -99 SPO 1997 04 20 01 25 91 6.3 -9 692.00 -54.4 -52.2 -54.5 63 -99 SPO 1997 04 20 01 26 90 6.3 -9 692.00 -54.4 -52.2 -54.5 63 -99 SPO 1997 04 20 01 27 90 6.5 -9 692.00 -54.4 -52.2 -54.4 63 -99 SPO 1997 04 20 01 28 90 6.8 -9 691.90 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 29 90 7.1 -9 691.90 -54.2 -52.1 -54.4 62 -99 SPO 1997 04 20 01 30 89 7.1 -9 691.90 -54.2 -52.0 -54.3 62 -99 SPO 1997 04 20 01 31 89 7.0 -9 691.90 -54.2 -52.0 -54.3 62 -99 SPO 1997 04 20 01 32 90 6.5 -9 691.90 -54.2 -52.0 -54.3 62 -99 SPO 1997 04 20 01 33 91 6.3 -9 691.90 -54.2 -52.0 -54.3 62 -99 SPO 1997 04 20 01 34 92 6.0 -9 691.90 -54.2 -52.1 -54.3 62 -99 SPO 1997 04 20 01 35 92 5.8 -9 691.90 -54.2 -52.2 -54.4 63 -99 SPO 1997 04 20 01 36 94 5.8 -9 691.90 -54.2 -52.2 -54.4 63 -99 SPO 1997 04 20 01 37 94 5.6 -9 691.90 -54.2 -52.1 -54.4 63 -99 SPO 1997 04 20 01 38 95 5.4 -9 691.90 -54.2 -52.1 -54.4 62 -99 SPO 1997 04 20 01 39 95 4.8 -9 692.00 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 40 95 5.0 -9 691.90 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 41 94 5.0 -9 691.90 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 42 93 4.7 -9 692.00 -54.3 -52.3 -54.5 63 -99 SPO 1997 04 20 01 43 92 4.7 -9 691.90 -54.3 -52.2 -54.5 61 -99 SPO 1997 04 20 01 44 92 4.5 -9 691.90 -54.3 -52.2 -54.4 61 -99 SPO 1997 04 20 01 45 91 4.5 -9 691.90 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 46 90 4.6 -9 691.90 -54.3 -52.2 -54.4 63 -99 SPO 1997 04 20 01 47 89 4.4 -9 692.00 -54.3 -52.2 -54.4 64 -99 SPO 1997 04 20 01 48 90 4.5 -9 692.00 -54.3 -52.2 -54.4 64 -99 SPO 1997 04 20 01 49 90 4.5 -9 691.90 -54.3 -52.2 -54.4 65 -99 SPO 1997 04 20 01 50 88 4.5 -9 692.00 -54.3 -52.1 -54.4 64 -99 SPO 1997 04 20 01 51 90 4.6 -9 691.90 -54.3 -52.1 -54.4 64 -99 SPO 1997 04 20 01 52 87 4.6 -9 691.90 -54.3 -52.0 -54.4 63 -99 SPO 1997 04 20 01 53 88 4.8 -9 691.90 -54.3 -52.0 -54.4 63 -99 SPO 1997 04 20 01 54 87 4.9 -9 691.90 -54.2 -51.9 -54.3 62 -99 SPO 1997 04 20 01 55 86 4.8 -9 691.90 -54.2 -51.9 -54.2 62 -99 SPO 1997 04 20 01 56 87 5.2 -9 691.90 -54.2 -51.8 -54.2 63 -99 SPO 1997 04 20 01 57 87 5.3 -9 691.90 -54.2 -51.7 -54.2 66 -99 SPO 1997 04 20 01 58 88 5.5 -9 691.90 -54.2 -51.7 -54.2 66 -99 SPO 1997 04 20 01 59 90 5.5 -9 691.80 -54.2 -51.7 -54.2 66 -99 SPO 1997 04 20 02 00 92 5.6 -9 691.80 -54.2 -51.7 -54.2 66 0 SPO 1997 04 20 02 01 92 5.6 -9 691.80 -54.2 -51.7 -54.3 66 -99 SPO 1997 04 20 02 02 91 5.6 -9 691.80 -54.2 -51.7 -54.3 64 -99 SPO 1997 04 20 02 03 91 5.5 -9 691.80 -54.2 -51.8 -54.3 63 -99 SPO 1997 04 20 02 04 91 5.5 -9 691.80 -54.2 -51.8 -54.3 62 -99 SPO 1997 04 20 02 05 90 5.4 -9 691.80 -54.2 -51.8 -54.2 62 -99 SPO 1997 04 20 02 06 88 5.3 -9 691.80 -54.2 -51.8 -54.2 62 -99 SPO 1997 04 20 02 07 88 5.2 -9 691.80 -54.2 -51.9 -54.2 62 -99 SPO 1997 04 20 02 08 88 5.1 -9 691.80 -54.2 -51.9 -54.3 62 -99 SPO 1997 04 20 02 09 87 5.0 -9 691.80 -54.3 -51.9 -54.4 63 -99 SPO 1997 04 20 02 10 87 4.9 -9 691.80 -54.3 -51.8 -54.4 63 -99 SPO 1997 04 20 02 11 87 4.8 -9 691.80 -54.4 -51.9 -54.5 63 -99 SPO 1997 04 20 02 12 87 4.8 -9 691.80 -54.5 -51.9 -54.6 64 -99 SPO 1997 04 20 02 13 86 4.9 -9 691.70 -54.6 -52.0 -54.6 63 -99 SPO 1997 04 20 02 14 86 5.1 -9 691.70 -54.7 -51.9 -54.7 63 -99 SPO 1997 04 20 02 15 85 5.4 -9 691.70 -54.8 -51.8 -54.8 64 -99 SPO 1997 04 20 02 16 85 5.6 -9 691.70 -54.8 -51.8 -54.8 62 -99 SPO 1997 04 20 02 17 85 5.9 -9 691.60 -54.9 -51.7 -54.9 63 -99 SPO 1997 04 20 02 18 85 5.8 -9 691.60 -54.9 -51.7 -54.9 63 -99 SPO 1997 04 20 02 19 85 5.8 -9 691.60 -55.0 -51.7 -55.0 62 -99 SPO 1997 04 20 02 20 84 5.9 -9 691.60 -55.0 -51.7 -55.0 64 -99 SPO 1997 04 20 02 21 84 6.0 -9 691.60 -54.9 -51.7 -54.9 63 -99 SPO 1997 04 20 02 22 84 5.8 -9 691.60 -54.9 -51.8 -55.0 63 -99 SPO 1997 04 20 02 23 85 6.0 -9 691.60 -55.0 -51.8 -55.0 64 -99 SPO 1997 04 20 02 24 85 6.1 -9 691.60 -55.0 -51.7 -54.9 64 -99 SPO 1997 04 20 02 25 85 6.2 -9 691.50 -54.8 -51.6 -54.8 62 -99 SPO 1997 04 20 02 26 84 6.3 -9 691.50 -54.8 -51.6 -54.8 62 -99 SPO 1997 04 20 02 27 84 6.6 -9 691.50 -54.7 -51.6 -54.7 63 -99 SPO 1997 04 20 02 28 84 6.6 -9 691.50 -54.6 -51.5 -54.6 63 -99 SPO 1997 04 20 02 29 84 6.8 -9 691.50 -54.6 -51.5 -54.6 63 -99 SPO 1997 04 20 02 30 84 6.8 -9 691.40 -54.5 -51.6 -54.5 62 -99 SPO 1997 04 20 02 31 83 6.8 -9 691.50 -54.4 -51.5 -54.5 61 -99 SPO 1997 04 20 02 32 83 7.0 -9 691.40 -54.4 -51.5 -54.5 61 -99 SPO 1997 04 20 02 33 83 6.8 -9 691.40 -54.4 -51.4 -54.5 61 -99 SPO 1997 04 20 02 34 83 6.7 -9 691.40 -54.4 -51.5 -54.5 61 -99 SPO 1997 04 20 02 35 82 6.6 -9 691.40 -54.4 -51.5 -54.5 62 -99 SPO 1997 04 20 02 36 82 6.8 -9 691.40 -54.4 -51.6 -54.5 63 -99 SPO 1997 04 20 02 37 82 6.7 -9 691.40 -54.4 -51.6 -54.5 63 -99 SPO 1997 04 20 02 38 82 6.5 -9 691.40 -54.3 -51.7 -54.4 63 -99 SPO 1997 04 20 02 39 81 6.6 -9 691.40 -54.4 -51.7 -54.5 63 -99 SPO 1997 04 20 02 40 81 6.7 -9 691.40 -54.4 -51.7 -54.5 63 -99 SPO 1997 04 20 02 41 81 6.5 -9 691.30 -54.4 -51.7 -54.5 62 -99 SPO 1997 04 20 02 42 81 6.4 -9 691.30 -54.4 -51.7 -54.5 61 -99 SPO 1997 04 20 02 43 81 6.4 -9 691.30 -54.4 -51.8 -54.5 61 -99 SPO 1997 04 20 02 44 81 6.3 -9 691.30 -54.4 -51.8 -54.5 61 -99 SPO 1997 04 20 02 45 80 6.1 -9 691.30 -54.4 -51.8 -54.6 61 -99 SPO 1997 04 20 02 46 80 6.0 -9 691.30 -54.5 -51.8 -54.5 62 -99 SPO 1997 04 20 02 47 81 5.9 -9 691.30 -54.5 -51.8 -54.6 63 -99 SPO 1997 04 20 02 48 80 5.7 -9 691.30 -54.5 -51.9 -54.6 63 -99 SPO 1997 04 20 02 49 79 5.5 -9 691.30 -54.6 -52.0 -54.7 63 -99 SPO 1997 04 20 02 50 77 5.2 -9 691.30 -54.6 -52.0 -54.7 63 -99 SPO 1997 04 20 02 51 76 5.0 -9 691.30 -54.6 -52.2 -54.7 63 -99 SPO 1997 04 20 02 52 76 4.8 -9 691.30 -54.7 -52.3 -54.8 62 -99 SPO 1997 04 20 02 53 76 4.7 -9 691.30 -54.7 -52.4 -54.8 62 -99 SPO 1997 04 20 02 54 75 4.7 -9 691.30 -54.7 -52.4 -54.8 62 -99 SPO 1997 04 20 02 55 75 4.8 -9 691.20 -54.7 -52.5 -54.8 62 -99 SPO 1997 04 20 02 56 74 4.8 -9 691.20 -54.8 -52.5 -54.8 62 -99 SPO 1997 04 20 02 57 74 4.9 -9 691.20 -54.8 -52.5 -54.8 62 -99 SPO 1997 04 20 02 58 76 5.0 -9 691.20 -54.8 -52.5 -54.9 62 -99 SPO 1997 04 20 02 59 77 5.2 -9 691.20 -54.8 -52.5 -54.9 62 -99 SPO 1997 04 20 03 00 77 5.2 -9 691.20 -54.9 -52.4 -55.0 63 0 SPO 1997 04 20 03 01 77 5.1 -9 691.10 -54.9 -52.5 -55.0 63 -99 SPO 1997 04 20 03 02 78 4.9 -9 691.10 -54.9 -52.6 -55.0 63 -99 SPO 1997 04 20 03 03 78 5.0 -9 691.10 -55.0 -52.6 -55.1 64 -99 SPO 1997 04 20 03 04 79 4.9 -9 691.10 -55.1 -52.6 -55.2 63 -99 SPO 1997 04 20 03 05 78 4.9 -9 691.10 -55.1 -52.6 -55.2 62 -99 SPO 1997 04 20 03 06 78 4.8 -9 691.10 -55.2 -52.6 -55.3 63 -99 SPO 1997 04 20 03 07 80 4.9 -9 691.10 -55.2 -52.6 -55.3 62 -99 SPO 1997 04 20 03 08 80 4.9 -9 691.10 -55.3 -52.6 -55.4 62 -99 SPO 1997 04 20 03 09 79 5.0 -9 691.10 -55.4 -52.7 -55.4 63 -99 SPO 1997 04 20 03 10 79 4.9 -9 691.10 -55.4 -52.6 -55.4 63 -99 SPO 1997 04 20 03 11 80 4.9 -9 691.00 -55.4 -52.6 -55.4 63 -99 SPO 1997 04 20 03 12 80 5.0 -9 691.00 -55.4 -52.6 -55.4 63 -99 SPO 1997 04 20 03 13 80 5.1 -9 691.00 -55.4 -52.5 -55.4 63 -99 SPO 1997 04 20 03 14 80 4.9 -9 691.00 -55.4 -52.5 -55.4 62 -99 SPO 1997 04 20 03 15 81 4.9 -9 691.00 -55.4 -52.5 -55.5 62 -99 SPO 1997 04 20 03 16 82 4.9 -9 691.00 -55.5 -52.4 -55.5 62 -99 SPO 1997 04 20 03 17 81 4.8 -9 691.00 -55.5 -52.4 -55.5 62 -99 SPO 1997 04 20 03 18 81 4.8 -9 691.00 -55.5 -52.4 -55.5 62 -99 SPO 1997 04 20 03 19 80 4.6 -9 691.00 -55.5 -52.4 -55.6 62 -99 SPO 1997 04 20 03 20 79 4.6 -9 691.00 -55.5 -52.4 -55.6 62 -99 SPO 1997 04 20 03 21 79 4.5 -9 691.00 -55.5 -52.5 -55.6 62 -99 SPO 1997 04 20 03 22 79 4.4 -9 691.00 -55.6 -52.5 -55.6 62 -99 SPO 1997 04 20 03 23 79 4.4 -9 691.00 -55.6 -52.4 -55.6 62 -99 SPO 1997 04 20 03 24 77 4.3 -9 690.90 -55.5 -52.5 -55.6 62 -99 SPO 1997 04 20 03 25 77 4.3 -9 690.90 -55.6 -52.5 -55.6 62 -99 SPO 1997 04 20 03 26 78 4.2 -9 691.00 -55.5 -52.6 -55.5 62 -99 SPO 1997 04 20 03 27 78 4.1 -9 690.90 -55.5 -52.5 -55.5 62 -99 SPO 1997 04 20 03 28 78 3.9 -9 690.90 -55.4 -52.6 -55.5 61 -99 SPO 1997 04 20 03 29 76 3.6 -9 690.90 -55.4 -52.7 -55.5 61 -99 SPO 1997 04 20 03 30 73 3.6 -9 690.90 -55.4 -52.8 -55.5 61 -99 SPO 1997 04 20 03 31 69 3.3 -9 690.90 -55.4 -52.9 -55.5 61 -99 SPO 1997 04 20 03 32 65 2.8 -9 691.00 -55.4 -53.1 -55.6 61 -99 SPO 1997 04 20 03 33 58 2.7 -9 690.90 -55.4 -53.2 -55.5 61 -99 SPO 1997 04 20 03 34 55 2.6 -9 691.00 -55.3 -53.1 -55.4 61 -99 SPO 1997 04 20 03 35 56 2.8 -9 691.00 -55.2 -53.1 -55.3 62 -99 SPO 1997 04 20 03 36 57 3.2 -9 690.90 -55.2 -53.0 -55.2 62 -99 SPO 1997 04 20 03 37 58 3.5 -9 690.90 -55.0 -52.8 -55.0 62 -99 SPO 1997 04 20 03 38 59 3.8 -9 690.90 -55.0 -52.8 -55.0 62 -99 SPO 1997 04 20 03 39 57 4.1 -9 690.80 -54.8 -52.6 -55.0 60 -99 SPO 1997 04 20 03 40 58 4.2 -9 690.80 -54.9 -52.6 -55.0 61 -99 SPO 1997 04 20 03 41 61 4.9 -9 690.80 -54.9 -52.6 -55.0 61 -99 SPO 1997 04 20 03 42 65 5.2 -9 690.80 -54.8 -52.4 -54.9 61 -99 SPO 1997 04 20 03 43 67 5.7 -9 690.70 -54.8 -52.3 -54.9 61 -99 SPO 1997 04 20 03 44 69 6.0 -9 690.60 -54.7 -52.2 -54.8 62 -99 SPO 1997 04 20 03 45 70 6.1 -9 690.60 -54.6 -52.2 -54.7 61 -99 SPO 1997 04 20 03 46 69 6.3 -9 690.60 -54.6 -52.2 -54.7 63 -99 SPO 1997 04 20 03 47 69 6.2 -9 690.60 -54.5 -52.0 -54.6 62 -99 SPO 1997 04 20 03 48 70 6.2 -9 690.60 -54.4 -52.0 -54.6 62 -99 SPO 1997 04 20 03 49 69 6.0 -9 690.60 -54.4 -52.0 -54.6 62 -99 SPO 1997 04 20 03 50 70 6.3 -9 690.60 -54.4 -51.9 -54.6 63 -99 SPO 1997 04 20 03 51 69 6.3 -9 690.60 -54.4 -51.9 -54.6 63 -99 SPO 1997 04 20 03 52 72 6.5 -9 690.50 -54.4 -51.8 -54.6 62 -99 SPO 1997 04 20 03 53 72 6.5 -9 690.60 -54.5 -51.8 -54.6 63 -99 SPO 1997 04 20 03 54 71 6.4 -9 690.60 -54.5 -51.8 -54.7 63 -99 SPO 1997 04 20 03 55 72 6.3 -9 690.50 -54.6 -51.8 -54.8 63 -99 SPO 1997 04 20 03 56 71 5.9 -9 690.60 -54.7 -51.8 -54.8 63 -99 SPO 1997 04 20 03 57 71 6.2 -9 690.60 -54.7 -51.8 -54.9 63 -99 SPO 1997 04 20 03 58 73 6.6 -9 690.60 -54.7 -51.7 -54.8 63 -99 SPO 1997 04 20 03 59 73 6.6 -9 690.60 -54.8 -51.8 -54.8 64 -99 SPO 1997 04 20 04 00 72 6.4 -9 690.50 -54.7 -51.7 -54.8 63 0 SPO 1997 04 20 04 01 74 6.5 -9 690.60 -54.7 -51.8 -54.8 63 -99 SPO 1997 04 20 04 02 75 6.8 -9 690.50 -54.8 -51.6 -54.8 64 -99 SPO 1997 04 20 04 03 76 7.0 -9 690.40 -54.8 -51.6 -54.8 64 -99 SPO 1997 04 20 04 04 76 7.1 -9 690.40 -54.7 -51.6 -54.8 63 -99 SPO 1997 04 20 04 05 75 7.1 -9 690.40 -54.6 -51.5 -54.7 63 -99 SPO 1997 04 20 04 06 76 7.0 -9 690.50 -54.6 -51.5 -54.6 63 -99 SPO 1997 04 20 04 07 75 6.8 -9 690.50 -54.6 -51.6 -54.7 63 -99 SPO 1997 04 20 04 08 76 6.8 -9 690.40 -54.6 -51.6 -54.8 63 -99 SPO 1997 04 20 04 09 76 7.1 -9 690.40 -54.7 -51.6 -54.8 63 -99 SPO 1997 04 20 04 10 75 7.2 -9 690.40 -54.7 -51.6 -54.9 63 -99 SPO 1997 04 20 04 11 74 7.2 -9 690.40 -54.8 -51.6 -54.8 65 -99 SPO 1997 04 20 04 12 74 7.2 -9 690.40 -54.8 -51.6 -54.9 64 -99 SPO 1997 04 20 04 13 73 7.1 -9 690.40 -54.8 -51.5 -54.8 64 -99 SPO 1997 04 20 04 14 74 6.8 -9 690.40 -54.7 -51.5 -54.8 63 -99 SPO 1997 04 20 04 15 75 6.8 -9 690.40 -54.8 -51.6 -54.9 62 -99 SPO 1997 04 20 04 16 72 6.5 -9 690.40 -54.8 -51.7 -55.0 62 -99 SPO 1997 04 20 04 17 73 6.5 -9 690.40 -54.9 -51.8 -55.0 62 -99 SPO 1997 04 20 04 18 73 6.4 -9 690.40 -54.9 -51.8 -55.0 61 -99 SPO 1997 04 20 04 19 73 6.2 -9 690.40 -54.9 -52.0 -55.0 62 -99 SPO 1997 04 20 04 20 72 6.1 -9 690.40 -54.9 -52.0 -55.0 63 -99 SPO 1997 04 20 04 21 71 6.0 -9 690.40 -54.9 -52.0 -55.0 63 -99 SPO 1997 04 20 04 22 72 5.9 -9 690.40 -54.9 -52.0 -55.0 63 -99 SPO 1997 04 20 04 23 73 6.2 -9 690.40 -54.9 -52.0 -55.0 63 -99 SPO 1997 04 20 04 24 74 6.6 -9 690.40 -54.9 -51.9 -55.0 63 -99 SPO 1997 04 20 04 25 75 6.7 -9 690.40 -55.0 -51.8 -55.1 62 -99 SPO 1997 04 20 04 26 75 6.8 -9 690.40 -55.0 -51.8 -55.1 62 -99 SPO 1997 04 20 04 27 75 6.8 -9 690.30 -55.1 -51.8 -55.1 62 -99 SPO 1997 04 20 04 28 77 7.0 -9 690.30 -55.0 -51.8 -55.2 62 -99 SPO 1997 04 20 04 29 76 6.8 -9 690.30 -55.2 -51.8 -55.3 62 -99 SPO 1997 04 20 04 30 77 6.7 -9 690.30 -55.2 -51.8 -55.4 62 -99 SPO 1997 04 20 04 31 78 6.4 -9 690.30 -55.4 -51.8 -55.4 62 -99 SPO 1997 04 20 04 32 79 6.4 -9 690.30 -55.4 -51.8 -55.5 63 -99 SPO 1997 04 20 04 33 80 6.3 -9 690.30 -55.5 -51.8 -55.6 62 -99 SPO 1997 04 20 04 34 82 6.2 -9 690.30 -55.7 -51.9 -55.8 63 -99 SPO 1997 04 20 04 35 82 6.2 -9 690.30 -55.8 -52.1 -55.9 64 -99 SPO 1997 04 20 04 36 82 5.8 -9 690.30 -55.9 -52.2 -56.0 63 -99 SPO 1997 04 20 04 37 84 5.9 -9 690.30 -55.9 -52.4 -55.8 63 -99 SPO 1997 04 20 04 38 80 5.5 -9 690.30 -55.8 -52.5 -55.8 62 -99 SPO 1997 04 20 04 39 86 6.1 -9 690.40 -55.8 -52.5 -55.8 62 -99 SPO 1997 04 20 04 40 83 6.0 -9 690.30 -55.8 -52.4 -55.7 62 -99 SPO 1997 04 20 04 41 85 6.3 -9 690.30 -55.7 -52.2 -55.6 61 -99 SPO 1997 04 20 04 42 83 6.5 -9 690.30 -55.6 -52.0 -55.5 62 -99 SPO 1997 04 20 04 43 83 6.4 -9 690.30 -55.4 -51.9 -55.4 61 -99 SPO 1997 04 20 04 44 84 6.5 -9 690.30 -55.3 -51.9 -55.4 62 -99 SPO 1997 04 20 04 45 83 6.3 -9 690.30 -55.3 -51.9 -55.4 62 -99 SPO 1997 04 20 04 46 84 6.3 -9 690.30 -55.4 -52.1 -55.5 63 -99 SPO 1997 04 20 04 47 87 6.5 -9 690.30 -55.4 -52.2 -55.6 62 -99 SPO 1997 04 20 04 48 87 6.6 -9 690.30 -55.5 -52.3 -55.7 62 -99 SPO 1997 04 20 04 49 88 6.6 -9 690.30 -55.6 -52.4 -55.8 62 -99 SPO 1997 04 20 04 50 87 6.5 -9 690.30 -55.7 -52.4 -55.9 61 -99 SPO 1997 04 20 04 51 85 6.1 -9 690.30 -55.8 -52.4 -55.9 62 -99 SPO 1997 04 20 04 52 85 5.7 -9 690.30 -55.8 -52.5 -55.9 61 -99 SPO 1997 04 20 04 53 85 5.4 -9 690.30 -55.8 -52.5 -55.9 61 -99 SPO 1997 04 20 04 54 85 5.2 -9 690.30 -55.8 -52.5 -55.8 61 -99 SPO 1997 04 20 04 55 85 5.3 -9 690.30 -55.7 -52.5 -55.8 61 -99 SPO 1997 04 20 04 56 85 5.6 -9 690.30 -55.7 -52.4 -55.7 61 -99 SPO 1997 04 20 04 57 86 5.9 -9 690.30 -55.6 -52.4 -55.7 62 -99 SPO 1997 04 20 04 58 87 5.8 -9 690.30 -55.6 -52.3 -55.7 62 -99 SPO 1997 04 20 04 59 88 5.8 -9 690.30 -55.6 -52.4 -55.7 62 -99 SPO 1997 04 20 05 00 89 6.0 -9 690.30 -55.6 -52.4 -55.7 62 0 SPO 1997 04 20 05 01 89 6.2 -9 690.30 -55.6 -52.4 -55.8 62 -99 SPO 1997 04 20 05 02 89 6.2 -9 690.20 -55.7 -52.4 -55.8 63 -99 SPO 1997 04 20 05 03 89 6.2 -9 690.20 -55.7 -52.4 -55.8 61 -99 SPO 1997 04 20 05 04 89 6.2 -9 690.20 -55.6 -52.5 -55.7 61 -99 SPO 1997 04 20 05 05 89 6.1 -9 690.20 -55.7 -52.5 -55.8 61 -99 SPO 1997 04 20 05 06 88 6.0 -9 690.20 -55.7 -52.6 -55.8 61 -99 SPO 1997 04 20 05 07 89 6.0 -9 690.20 -55.7 -52.6 -55.8 61 -99 SPO 1997 04 20 05 08 89 5.9 -9 690.20 -55.7 -52.6 -55.8 61 -99 SPO 1997 04 20 05 09 90 6.0 -9 690.20 -55.8 -52.7 -55.8 62 -99 SPO 1997 04 20 05 10 89 6.2 -9 690.20 -55.7 -52.7 -55.8 61 -99 SPO 1997 04 20 05 11 88 6.2 -9 690.10 -55.7 -52.7 -55.8 61 -99 SPO 1997 04 20 05 12 89 6.4 -9 690.10 -55.7 -52.6 -55.7 63 -99 SPO 1997 04 20 05 13 89 6.2 -9 690.10 -55.6 -52.6 -55.8 62 -99 SPO 1997 04 20 05 14 90 6.1 -9 690.10 -55.7 -52.6 -55.8 63 -99 SPO 1997 04 20 05 15 91 6.0 -9 690.10 -55.6 -52.6 -55.8 61 -99 SPO 1997 04 20 05 16 92 5.9 -9 690.10 -55.6 -52.7 -55.8 61 -99 SPO 1997 04 20 05 17 93 5.9 -9 690.10 -55.7 -52.8 -55.8 61 -99 SPO 1997 04 20 05 18 93 5.9 -9 690.10 -55.7 -52.8 -55.8 61 -99 SPO 1997 04 20 05 19 93 5.7 -9 690.10 -55.7 -52.8 -55.8 61 -99 SPO 1997 04 20 05 20 94 5.8 -9 690.00 -55.6 -52.9 -55.8 61 -99 SPO 1997 04 20 05 21 92 5.9 -9 690.00 -55.7 -53.0 -55.8 63 -99 SPO 1997 04 20 05 22 92 5.9 -9 690.00 -55.6 -53.0 -55.7 62 -99 SPO 1997 04 20 05 23 91 6.0 -9 690.00 -55.6 -53.0 -55.6 62 -99 SPO 1997 04 20 05 24 91 6.0 -9 690.00 -55.5 -53.1 -55.6 62 -99 SPO 1997 04 20 05 25 90 6.0 -9 690.00 -55.6 -53.0 -55.7 62 -99 SPO 1997 04 20 05 26 90 5.9 -9 690.00 -55.6 -53.1 -55.6 61 -99 SPO 1997 04 20 05 27 90 6.0 -9 690.00 -55.5 -53.1 -55.6 60 -99 SPO 1997 04 20 05 28 89 5.9 -9 690.00 -55.5 -53.0 -55.6 60 -99 SPO 1997 04 20 05 29 89 5.9 -9 689.90 -55.5 -53.0 -55.6 60 -99 SPO 1997 04 20 05 30 90 5.7 -9 689.90 -55.5 -53.0 -55.6 62 -99 SPO 1997 04 20 05 31 91 5.7 -9 690.00 -55.5 -53.0 -55.6 62 -99 SPO 1997 04 20 05 32 92 5.6 -9 689.90 -55.4 -53.0 -55.6 61 -99 SPO 1997 04 20 05 33 93 5.6 -9 689.90 -55.4 -53.0 -55.6 62 -99 SPO 1997 04 20 05 34 93 5.5 -9 689.90 -55.4 -53.0 -55.6 62 -99 SPO 1997 04 20 05 35 93 5.5 -9 689.90 -55.4 -53.0 -55.6 62 -99 SPO 1997 04 20 05 36 94 5.5 -9 689.90 -55.4 -53.0 -55.5 62 -99 SPO 1997 04 20 05 37 93 5.5 -9 689.90 -55.3 -53.1 -55.4 61 -99 SPO 1997 04 20 05 38 92 5.6 -9 689.90 -55.3 -53.1 -55.4 61 -99 SPO 1997 04 20 05 39 92 5.5 -9 689.90 -55.2 -53.2 -55.3 60 -99 SPO 1997 04 20 05 40 92 5.7 -9 689.80 -55.2 -53.2 -55.3 62 -99 SPO 1997 04 20 05 41 92 5.7 -9 689.80 -55.2 -53.2 -55.2 62 -99 SPO 1997 04 20 05 42 92 5.8 -9 689.80 -55.2 -53.2 -55.2 63 -99 SPO 1997 04 20 05 43 91 5.7 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 44 92 5.8 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 45 91 5.4 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 46 93 5.6 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 47 92 5.5 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 48 92 5.5 -9 689.80 -55.1 -53.1 -55.2 62 -99 SPO 1997 04 20 05 49 90 5.6 -9 689.80 -55.1 -53.1 -55.2 61 -99 SPO 1997 04 20 05 50 89 5.8 -9 689.70 -55.0 -53.1 -55.0 60 -99 SPO 1997 04 20 05 51 89 5.8 -9 689.70 -54.9 -53.0 -55.0 61 -99 SPO 1997 04 20 05 52 88 5.7 -9 689.70 -54.8 -53.0 -55.0 60 -99 SPO 1997 04 20 05 53 88 5.5 -9 689.70 -54.9 -53.0 -55.0 61 -99 SPO 1997 04 20 05 54 88 5.4 -9 689.70 -54.9 -53.0 -55.1 62 -99 SPO 1997 04 20 05 55 89 5.5 -9 689.70 -54.9 -53.1 -55.0 63 -99 SPO 1997 04 20 05 56 89 5.2 -9 689.70 -54.9 -53.1 -55.0 63 -99 SPO 1997 04 20 05 57 90 5.3 -9 689.70 -54.8 -53.1 -55.0 62 -99 SPO 1997 04 20 05 58 90 5.2 -9 689.70 -54.8 -53.2 -55.0 62 -99 SPO 1997 04 20 05 59 92 5.3 -9 689.70 -54.8 -53.2 -55.0 62 -99 SPO 1997 04 20 06 00 93 5.3 -9 689.70 -54.8 -53.2 -55.0 62 0 SPO 1997 04 20 06 01 93 5.2 -9 689.70 -54.9 -53.2 -55.1 63 -99 SPO 1997 04 20 06 02 97 5.3 -9 689.70 -54.9 -53.2 -55.0 62 -99 SPO 1997 04 20 06 03 96 5.0 -9 689.70 -54.9 -53.2 -55.0 62 -99 SPO 1997 04 20 06 04 98 4.6 -9 689.70 -54.9 -53.3 -55.1 61 -99 SPO 1997 04 20 06 05 100 4.6 -9 689.70 -55.0 -53.3 -55.2 62 -99 SPO 1997 04 20 06 06 99 4.9 -9 689.70 -55.1 -53.2 -55.2 62 -99 SPO 1997 04 20 06 07 98 5.4 -9 689.70 -55.0 -53.2 -55.2 62 -99 SPO 1997 04 20 06 08 98 5.6 -9 689.70 -55.0 -53.2 -55.2 62 -99 SPO 1997 04 20 06 09 98 5.8 -9 689.60 -55.0 -53.3 -55.0 62 -99 SPO 1997 04 20 06 10 96 5.7 -9 689.60 -54.9 -53.3 -55.0 62 -99 SPO 1997 04 20 06 11 96 5.8 -9 689.60 -54.9 -53.2 -55.0 63 -99 SPO 1997 04 20 06 12 94 5.8 -9 689.60 -54.9 -53.2 -55.0 63 -99 SPO 1997 04 20 06 13 93 5.8 -9 689.60 -54.8 -53.3 -55.0 61 -99 SPO 1997 04 20 06 14 93 5.8 -9 689.60 -54.8 -53.3 -54.9 61 -99 SPO 1997 04 20 06 15 93 6.1 -9 689.60 -54.8 -53.4 -54.9 61 -99 SPO 1997 04 20 06 16 95 6.2 -9 689.60 -54.8 -53.4 -54.9 62 -99 SPO 1997 04 20 06 17 95 6.3 -9 689.50 -54.8 -53.4 -54.9 62 -99 SPO 1997 04 20 06 18 95 5.9 -9 689.60 -54.7 -53.4 -54.9 63 -99 SPO 1997 04 20 06 19 97 5.6 -9 689.50 -54.8 -53.5 -55.0 64 -99 SPO 1997 04 20 06 20 96 5.8 -9 689.60 -54.8 -53.6 -55.1 64 -99 SPO 1997 04 20 06 21 97 5.7 -9 689.60 -54.9 -53.6 -55.1 65 -99 SPO 1997 04 20 06 22 97 6.0 -9 689.50 -55.0 -53.6 -55.1 64 -99 SPO 1997 04 20 06 23 95 5.8 -9 689.60 -55.0 -53.6 -55.2 64 -99 SPO 1997 04 20 06 24 94 5.6 -9 689.60 -55.0 -53.7 -55.1 62 -99 SPO 1997 04 20 06 25 94 5.7 -9 689.60 -55.0 -53.7 -55.2 62 -99 SPO 1997 04 20 06 26 93 5.8 -9 689.60 -55.0 -53.7 -55.2 62 -99 SPO 1997 04 20 06 27 94 5.6 -9 689.60 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 28 94 5.8 -9 689.50 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 29 92 5.8 -9 689.50 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 30 92 5.5 -9 689.50 -55.1 -53.8 -55.1 62 -99 SPO 1997 04 20 06 31 92 5.5 -9 689.50 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 32 91 5.2 -9 689.50 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 33 89 5.4 -9 689.50 -55.1 -53.8 -55.2 62 -99 SPO 1997 04 20 06 34 90 5.0 -9 689.50 -55.0 -53.8 -55.1 62 -99 SPO 1997 04 20 06 35 87 4.9 -9 689.50 -55.0 -53.8 -55.1 62 -99 SPO 1997 04 20 06 36 87 4.4 -9 689.60 -55.0 -53.8 -55.1 62 -99 SPO 1997 04 20 06 37 86 4.3 -9 689.60 -55.0 -53.9 -55.1 62 -99 SPO 1997 04 20 06 38 86 4.0 -9 689.60 -55.0 -53.9 -55.1 62 -99 SPO 1997 04 20 06 39 87 3.6 -9 689.60 -55.0 -53.9 -55.1 62 -99 SPO 1997 04 20 06 40 88 3.5 -9 689.60 -55.0 -54.0 -55.2 62 -99 SPO 1997 04 20 06 41 87 3.5 -9 689.60 -55.0 -54.0 -55.2 62 -99 SPO 1997 04 20 06 42 87 3.8 -9 689.60 -55.0 -54.0 -55.2 62 -99 SPO 1997 04 20 06 43 86 3.8 -9 689.60 -55.0 -54.0 -55.1 62 -99 SPO 1997 04 20 06 44 89 4.0 -9 689.50 -54.9 -54.1 -55.1 62 -99 SPO 1997 04 20 06 45 89 4.2 -9 689.50 -54.9 -54.0 -55.1 63 -99 SPO 1997 04 20 06 46 91 4.5 -9 689.50 -54.9 -54.0 -55.0 63 -99 SPO 1997 04 20 06 47 88 4.5 -9 689.40 -54.9 -53.9 -55.0 62 -99 SPO 1997 04 20 06 48 87 4.5 -9 689.40 -54.9 -53.9 -55.0 62 -99 SPO 1997 04 20 06 49 89 4.6 -9 689.40 -54.9 -53.9 -55.0 62 -99 SPO 1997 04 20 06 50 89 4.4 -9 689.40 -54.9 -53.9 -55.0 61 -99 SPO 1997 04 20 06 51 88 4.1 -9 689.40 -54.9 -53.9 -55.1 61 -99 SPO 1997 04 20 06 52 86 4.2 -9 689.40 -55.0 -53.9 -55.1 62 -99 SPO 1997 04 20 06 53 85 4.4 -9 689.40 -54.9 -53.9 -55.1 62 -99 SPO 1997 04 20 06 54 84 4.2 -9 689.30 -54.9 -53.9 -55.1 63 -99 SPO 1997 04 20 06 55 84 4.2 -9 689.30 -54.9 -53.9 -55.1 63 -99 SPO 1997 04 20 06 56 83 4.4 -9 689.20 -54.9 -54.0 -55.1 63 -99 SPO 1997 04 20 06 57 83 4.5 -9 689.20 -54.9 -54.0 -55.1 63 -99 SPO 1997 04 20 06 58 84 4.5 -9 689.20 -55.0 -54.0 -55.2 64 -99 SPO 1997 04 20 06 59 86 4.3 -9 689.20 -55.0 -54.1 -55.2 62 -99 SPO 1997 04 20 07 00 88 4.5 -9 689.20 -55.1 -54.2 -55.3 62 0 SPO 1997 04 20 07 01 90 4.8 -9 689.10 -55.2 -54.3 -55.4 63 -99 SPO 1997 04 20 07 02 90 5.1 -9 689.10 -55.3 -54.3 -55.4 62 -99 SPO 1997 04 20 07 03 92 5.0 -9 689.10 -55.4 -54.3 -55.5 63 -99 SPO 1997 04 20 07 04 88 4.5 -9 689.10 -55.5 -54.3 -55.6 64 -99 SPO 1997 04 20 07 05 88 4.2 -9 689.10 -55.6 -54.4 -55.6 65 -99 SPO 1997 04 20 07 06 87 3.9 -9 689.10 -55.6 -54.4 -55.7 65 -99 SPO 1997 04 20 07 07 87 3.8 -9 689.10 -55.7 -54.5 -55.8 64 -99 SPO 1997 04 20 07 08 86 3.5 -9 689.10 -55.7 -54.5 -55.8 63 -99 SPO 1997 04 20 07 09 86 3.6 -9 689.10 -55.8 -54.6 -55.8 64 -99 SPO 1997 04 20 07 10 85 3.8 -9 689.10 -55.8 -54.6 -55.8 62 -99 SPO 1997 04 20 07 11 86 4.1 -9 689.00 -55.7 -54.5 -55.8 61 -99 SPO 1997 04 20 07 12 83 4.3 -9 689.00 -55.7 -54.5 -55.8 61 -99 SPO 1997 04 20 07 13 81 4.0 -9 689.00 -55.7 -54.5 -55.8 61 -99 SPO 1997 04 20 07 14 74 3.2 -9 689.00 -55.7 -54.6 -55.8 61 -99 SPO 1997 04 20 07 15 69 3.1 -9 689.00 -55.8 -54.7 -55.9 62 -99 SPO 1997 04 20 07 16 65 2.7 -9 689.10 -55.8 -54.7 -55.9 62 -99 SPO 1997 04 20 07 17 71 2.7 -9 689.00 -55.8 -54.8 -55.9 62 -99 SPO 1997 04 20 07 18 71 2.8 -9 689.00 -55.8 -54.9 -55.9 62 -99 SPO 1997 04 20 07 19 69 2.7 -9 689.00 -55.8 -54.9 -55.9 62 -99 SPO 1997 04 20 07 20 60 2.6 -9 689.00 -55.8 -55.0 -55.9 62 -99 SPO 1997 04 20 07 21 53 2.2 -9 689.10 -55.8 -55.1 -55.9 62 -99 SPO 1997 04 20 07 22 58 2.3 -9 689.00 -55.8 -55.1 -55.9 62 -99 SPO 1997 04 20 07 23 65 2.3 -9 689.00 -55.8 -55.1 -55.9 62 -99 SPO 1997 04 20 07 24 71 3.0 -9 689.00 -55.8 -55.0 -55.9 62 -99 SPO 1997 04 20 07 25 78 3.0 -9 689.00 -55.8 -54.9 -55.9 62 -99 SPO 1997 04 20 07 26 79 3.4 -9 689.00 -55.7 -54.8 -55.9 61 -99 SPO 1997 04 20 07 27 83 3.6 -9 689.00 -55.7 -54.8 -55.9 61 -99 SPO 1997 04 20 07 28 82 4.1 -9 689.00 -55.8 -54.7 -55.9 62 -99 SPO 1997 04 20 07 29 83 4.2 -9 689.00 -55.7 -54.6 -55.9 61 -99 SPO 1997 04 20 07 30 82 4.1 -9 689.00 -55.7 -54.6 -55.9 61 -99 SPO 1997 04 20 07 31 82 4.1 -9 689.00 -55.7 -54.6 -55.9 61 -99 SPO 1997 04 20 07 32 81 3.5 -9 689.00 -55.7 -54.5 -56.0 61 -99 SPO 1997 04 20 07 33 77 3.2 -9 689.00 -55.8 -54.6 -56.0 62 -99 SPO 1997 04 20 07 34 78 3.0 -9 689.00 -55.8 -54.7 -56.0 61 -99 SPO 1997 04 20 07 35 77 2.6 -9 689.00 -55.8 -54.8 -56.0 61 -99 SPO 1997 04 20 07 36 77 2.3 -9 689.10 -55.8 -54.9 -56.0 60 -99 SPO 1997 04 20 07 37 70 2.4 -9 689.10 -55.8 -54.9 -56.0 61 -99 SPO 1997 04 20 07 38 73 2.5 -9 689.00 -55.8 -54.8 -56.0 61 -99 SPO 1997 04 20 07 39 74 2.7 -9 689.00 -55.7 -54.8 -56.0 61 -99 SPO 1997 04 20 07 40 74 3.0 -9 689.00 -55.7 -54.7 -55.9 61 -99 SPO 1997 04 20 07 41 74 3.5 -9 689.00 -55.6 -54.6 -55.8 62 -99 SPO 1997 04 20 07 42 77 3.7 -9 689.00 -55.5 -54.5 -55.7 62 -99 SPO 1997 04 20 07 43 77 4.3 -9 689.00 -55.5 -54.4 -55.7 62 -99 SPO 1997 04 20 07 44 78 4.6 -9 688.90 -55.4 -54.4 -55.6 62 -99 SPO 1997 04 20 07 45 79 4.9 -9 688.90 -55.4 -54.3 -55.6 62 -99 SPO 1997 04 20 07 46 79 5.2 -9 688.90 -55.4 -54.3 -55.6 62 -99 SPO 1997 04 20 07 47 79 5.6 -9 688.90 -55.3 -54.2 -55.6 60 -99 SPO 1997 04 20 07 48 81 6.0 -9 688.80 -55.3 -54.0 -55.5 60 -99 SPO 1997 04 20 07 49 80 6.1 -9 688.80 -55.3 -54.0 -55.5 60 -99 SPO 1997 04 20 07 50 79 6.0 -9 688.80 -55.3 -54.0 -55.5 60 -99 SPO 1997 04 20 07 51 80 6.0 -9 688.80 -55.4 -54.0 -55.6 61 -99 SPO 1997 04 20 07 52 79 5.8 -9 688.80 -55.4 -54.0 -55.6 62 -99 SPO 1997 04 20 07 53 77 5.6 -9 688.80 -55.4 -54.0 -55.6 62 -99 SPO 1997 04 20 07 54 77 5.6 -9 688.80 -55.4 -54.1 -55.6 62 -99 SPO 1997 04 20 07 55 78 5.6 -9 688.80 -55.4 -54.0 -55.6 62 -99 SPO 1997 04 20 07 56 78 5.7 -9 688.80 -55.5 -54.0 -55.6 62 -99 SPO 1997 04 20 07 57 80 5.9 -9 688.70 -55.5 -54.0 -55.7 62 -99 SPO 1997 04 20 07 58 79 6.1 -9 688.70 -55.5 -53.9 -55.7 62 -99 SPO 1997 04 20 07 59 78 5.8 -9 688.70 -55.6 -53.8 -55.7 62 -99 SPO 1997 04 20 08 00 78 5.7 -9 688.70 -55.6 -53.8 -55.7 61 0 SPO 1997 04 20 08 01 76 5.5 -9 688.70 -55.6 -53.8 -55.7 61 -99 SPO 1997 04 20 08 02 76 5.3 -9 688.70 -55.6 -53.8 -55.8 61 -99 SPO 1997 04 20 08 03 76 5.1 -9 688.70 -55.6 -53.8 -55.8 61 -99 SPO 1997 04 20 08 04 76 5.0 -9 688.70 -55.7 -53.8 -55.8 61 -99 SPO 1997 04 20 08 05 77 4.9 -9 688.70 -55.7 -53.8 -55.9 61 -99 SPO 1997 04 20 08 06 78 5.0 -9 688.70 -55.8 -53.7 -55.9 62 -99 SPO 1997 04 20 08 07 80 5.0 -9 688.70 -55.8 -53.7 -55.9 62 -99 SPO 1997 04 20 08 08 81 5.0 -9 688.70 -55.9 -53.8 -56.0 63 -99 SPO 1997 04 20 08 09 80 4.9 -9 688.70 -56.0 -53.8 -56.1 62 -99 SPO 1997 04 20 08 10 82 5.1 -9 688.60 -56.1 -53.8 -56.2 62 -99 SPO 1997 04 20 08 11 83 5.5 -9 688.60 -56.1 -53.6 -56.2 62 -99 SPO 1997 04 20 08 12 84 5.7 -9 688.60 -56.2 -53.6 -56.2 63 -99 SPO 1997 04 20 08 13 84 5.9 -9 688.60 -56.2 -53.5 -56.2 61 -99 SPO 1997 04 20 08 14 85 5.9 -9 688.60 -56.2 -53.5 -56.2 61 -99 SPO 1997 04 20 08 15 84 6.0 -9 688.50 -56.3 -53.5 -56.3 64 -99 SPO 1997 04 20 08 16 84 6.2 -9 688.50 -56.3 -53.5 -56.4 64 -99 SPO 1997 04 20 08 17 84 6.2 -9 688.50 -56.2 -53.4 -56.4 63 -99 SPO 1997 04 20 08 18 84 6.4 -9 688.50 -56.3 -53.4 -56.4 62 -99 SPO 1997 04 20 08 19 84 6.7 -9 688.40 -56.3 -53.3 -56.4 62 -99 SPO 1997 04 20 08 20 84 6.8 -9 688.40 -56.3 -53.3 -56.4 64 -99 SPO 1997 04 20 08 21 85 6.8 -9 688.40 -56.2 -53.3 -56.2 61 -99 SPO 1997 04 20 08 22 86 7.0 -9 688.30 -56.1 -53.3 -56.1 61 -99 SPO 1997 04 20 08 23 85 6.9 -9 688.30 -56.0 -53.3 -56.1 60 -99 SPO 1997 04 20 08 24 84 6.7 -9 688.40 -56.1 -53.4 -56.1 61 -99 SPO 1997 04 20 08 25 86 6.8 -9 688.30 -56.1 -53.5 -56.2 61 -99 SPO 1997 04 20 08 26 86 6.9 -9 688.30 -56.2 -53.5 -56.3 61 -99 SPO 1997 04 20 08 27 85 7.0 -9 688.30 -56.2 -53.5 -56.3 61 -99 SPO 1997 04 20 08 28 86 6.9 -9 688.30 -56.2 -53.4 -56.4 61 -99 SPO 1997 04 20 08 29 86 7.0 -9 688.30 -56.3 -53.4 -56.4 62 -99 SPO 1997 04 20 08 30 87 6.8 -9 688.20 -56.4 -53.4 -56.4 63 -99 SPO 1997 04 20 08 31 86 6.8 -9 688.20 -56.4 -53.5 -56.4 63 -99 SPO 1997 04 20 08 32 86 6.8 -9 688.20 -56.5 -53.5 -56.5 64 -99 SPO 1997 04 20 08 33 87 6.8 -9 688.20 -56.4 -53.4 -56.5 61 -99 SPO 1997 04 20 08 34 87 6.7 -9 688.20 -56.4 -53.4 -56.5 61 -99 SPO 1997 04 20 08 35 88 6.5 -9 688.20 -56.4 -53.4 -56.5 61 -99 SPO 1997 04 20 08 36 89 6.5 -9 688.20 -56.4 -53.4 -56.5 61 -99 SPO 1997 04 20 08 37 90 6.2 -9 688.20 -56.4 -53.5 -56.5 61 -99 SPO 1997 04 20 08 38 90 6.2 -9 688.20 -56.4 -53.5 -56.5 61 -99 SPO 1997 04 20 08 39 91 6.4 -9 688.20 -56.4 -53.5 -56.5 61 -99 SPO 1997 04 20 08 40 89 6.4 -9 688.20 -56.4 -53.5 -56.5 61 -99 SPO 1997 04 20 08 41 91 6.5 -9 688.10 -56.3 -53.6 -56.4 60 -99 SPO 1997 04 20 08 42 90 6.3 -9 688.20 -56.2 -53.7 -56.3 60 -99 SPO 1997 04 20 08 43 89 6.1 -9 688.20 -56.3 -53.7 -56.4 62 -99 SPO 1997 04 20 08 44 89 6.0 -9 688.20 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 08 45 91 6.2 -9 688.20 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 08 46 91 5.9 -9 688.20 -56.4 -53.8 -56.5 61 -99 SPO 1997 04 20 08 47 92 5.8 -9 688.20 -56.6 -53.9 -56.7 62 -99 SPO 1997 04 20 08 48 90 5.8 -9 688.20 -56.6 -53.9 -56.8 60 -99 SPO 1997 04 20 08 49 91 5.7 -9 688.20 -56.6 -53.9 -56.8 60 -99 SPO 1997 04 20 08 50 90 5.5 -9 688.20 -56.6 -53.9 -56.7 60 -99 SPO 1997 04 20 08 51 90 5.5 -9 688.20 -56.6 -53.9 -56.7 62 -99 SPO 1997 04 20 08 52 89 5.7 -9 688.20 -56.6 -53.8 -56.7 62 -99 SPO 1997 04 20 08 53 87 5.7 -9 688.10 -56.6 -53.8 -56.6 62 -99 SPO 1997 04 20 08 54 86 5.5 -9 688.10 -56.6 -53.8 -56.6 62 -99 SPO 1997 04 20 08 55 87 5.8 -9 688.10 -56.5 -53.7 -56.6 61 -99 SPO 1997 04 20 08 56 86 5.7 -9 688.10 -56.4 -53.7 -56.5 61 -99 SPO 1997 04 20 08 57 86 6.1 -9 688.00 -56.4 -53.7 -56.4 61 -99 SPO 1997 04 20 08 58 85 6.0 -9 688.00 -56.3 -53.7 -56.4 60 -99 SPO 1997 04 20 08 59 85 5.9 -9 688.00 -56.2 -53.7 -56.4 59 -99 SPO 1997 04 20 09 00 85 5.8 -9 688.00 -56.3 -53.7 -56.4 61 0 SPO 1997 04 20 09 01 85 5.8 -9 688.00 -56.3 -53.7 -56.4 61 -99 SPO 1997 04 20 09 02 86 5.7 -9 688.00 -56.3 -53.7 -56.4 61 -99 SPO 1997 04 20 09 03 85 5.5 -9 688.00 -56.4 -53.7 -56.5 61 -99 SPO 1997 04 20 09 04 86 5.5 -9 688.00 -56.4 -53.7 -56.5 61 -99 SPO 1997 04 20 09 05 83 4.8 -9 688.00 -56.4 -53.7 -56.6 61 -99 SPO 1997 04 20 09 06 83 4.6 -9 688.00 -56.4 -53.7 -56.6 61 -99 SPO 1997 04 20 09 07 82 4.6 -9 688.00 -56.4 -53.7 -56.6 61 -99 SPO 1997 04 20 09 08 83 4.8 -9 688.00 -56.4 -53.7 -56.5 61 -99 SPO 1997 04 20 09 09 82 4.7 -9 688.00 -56.3 -53.8 -56.5 60 -99 SPO 1997 04 20 09 10 83 4.8 -9 688.00 -56.3 -53.8 -56.4 60 -99 SPO 1997 04 20 09 11 81 4.6 -9 688.00 -56.3 -53.8 -56.5 60 -99 SPO 1997 04 20 09 12 81 4.9 -9 688.00 -56.3 -53.8 -56.4 61 -99 SPO 1997 04 20 09 13 82 4.9 -9 688.00 -56.2 -53.8 -56.4 60 -99 SPO 1997 04 20 09 14 80 4.8 -9 688.00 -56.2 -53.8 -56.4 60 -99 SPO 1997 04 20 09 15 83 5.0 -9 688.00 -56.2 -53.9 -56.4 61 -99 SPO 1997 04 20 09 16 80 4.8 -9 687.90 -56.3 -54.0 -56.4 62 -99 SPO 1997 04 20 09 17 80 5.3 -9 687.90 -56.3 -54.0 -56.5 62 -99 SPO 1997 04 20 09 18 83 5.4 -9 687.90 -56.4 -54.0 -56.5 63 -99 SPO 1997 04 20 09 19 81 5.2 -9 687.90 -56.4 -54.1 -56.6 61 -99 SPO 1997 04 20 09 20 81 5.3 -9 687.90 -56.5 -54.1 -56.6 61 -99 SPO 1997 04 20 09 21 80 5.4 -9 687.90 -56.5 -54.0 -56.6 61 -99 SPO 1997 04 20 09 22 81 5.7 -9 687.90 -56.4 -54.1 -56.6 61 -99 SPO 1997 04 20 09 23 84 6.0 -9 687.80 -56.4 -53.9 -56.6 61 -99 SPO 1997 04 20 09 24 82 5.4 -9 687.80 -56.4 -54.0 -56.5 61 -99 SPO 1997 04 20 09 25 80 5.7 -9 687.90 -56.4 -54.0 -56.6 61 -99 SPO 1997 04 20 09 26 81 6.0 -9 687.80 -56.4 -53.8 -56.4 61 -99 SPO 1997 04 20 09 27 80 6.3 -9 687.80 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 09 28 81 6.2 -9 687.80 -56.2 -53.7 -56.3 61 -99 SPO 1997 04 20 09 29 84 6.2 -9 687.70 -56.2 -53.7 -56.3 63 -99 SPO 1997 04 20 09 30 82 6.3 -9 687.70 -56.2 -53.7 -56.3 61 -99 SPO 1997 04 20 09 31 83 6.3 -9 687.70 -56.1 -53.8 -56.3 61 -99 SPO 1997 04 20 09 32 83 6.5 -9 687.70 -56.2 -53.8 -56.3 63 -99 SPO 1997 04 20 09 33 83 6.4 -9 687.70 -56.1 -53.8 -56.2 62 -99 SPO 1997 04 20 09 34 79 5.6 -9 687.80 -56.1 -53.8 -56.2 62 -99 SPO 1997 04 20 09 35 80 5.5 -9 687.80 -56.1 -54.0 -56.2 62 -99 SPO 1997 04 20 09 36 81 5.6 -9 687.80 -56.1 -54.0 -56.2 62 -99 SPO 1997 04 20 09 37 81 5.5 -9 687.80 -56.1 -54.0 -56.2 62 -99 SPO 1997 04 20 09 38 80 5.3 -9 687.80 -56.1 -54.0 -56.2 63 -99 SPO 1997 04 20 09 39 82 5.5 -9 687.90 -56.1 -54.0 -56.2 63 -99 SPO 1997 04 20 09 40 84 5.5 -9 687.80 -56.0 -53.9 -56.2 61 -99 SPO 1997 04 20 09 41 83 5.7 -9 687.90 -56.1 -54.0 -56.4 62 -99 SPO 1997 04 20 09 42 86 6.1 -9 687.80 -56.2 -54.0 -56.4 61 -99 SPO 1997 04 20 09 43 87 5.9 -9 687.80 -56.2 -53.8 -56.4 61 -99 SPO 1997 04 20 09 44 87 6.0 -9 687.80 -56.3 -54.0 -56.5 62 -99 SPO 1997 04 20 09 45 90 6.2 -9 687.80 -56.4 -54.0 -56.5 61 -99 SPO 1997 04 20 09 46 90 6.4 -9 687.80 -56.4 -54.0 -56.5 61 -99 SPO 1997 04 20 09 47 88 6.2 -9 687.80 -56.4 -54.0 -56.5 61 -99 SPO 1997 04 20 09 48 88 6.3 -9 687.80 -56.4 -54.0 -56.4 63 -99 SPO 1997 04 20 09 49 88 6.4 -9 687.80 -56.4 -54.0 -56.5 63 -99 SPO 1997 04 20 09 50 87 6.6 -9 687.80 -56.5 -53.9 -56.5 64 -99 SPO 1997 04 20 09 51 85 6.1 -9 687.80 -56.5 -53.8 -56.5 64 -99 SPO 1997 04 20 09 52 85 6.2 -9 687.80 -56.5 -53.8 -56.5 64 -99 SPO 1997 04 20 09 53 87 6.7 -9 687.70 -56.5 -53.5 -56.6 62 -99 SPO 1997 04 20 09 54 86 6.3 -9 687.70 -56.5 -53.6 -56.6 62 -99 SPO 1997 04 20 09 55 87 6.6 -9 687.70 -56.4 -53.6 -56.6 61 -99 SPO 1997 04 20 09 56 84 6.3 -9 687.60 -56.5 -53.6 -56.6 61 -99 SPO 1997 04 20 09 57 86 6.5 -9 687.70 -56.5 -53.5 -56.6 61 -99 SPO 1997 04 20 09 58 88 6.6 -9 687.60 -56.5 -53.5 -56.6 61 -99 SPO 1997 04 20 09 59 87 6.6 -9 687.60 -56.5 -53.5 -56.6 61 -99 SPO 1997 04 20 10 00 89 6.2 -9 687.60 -56.5 -53.6 -56.6 61 0 SPO 1997 04 20 10 01 91 6.5 -9 687.60 -56.5 -53.5 -56.6 61 -99 SPO 1997 04 20 10 02 91 6.5 -9 687.60 -56.5 -53.4 -56.6 61 -99 SPO 1997 04 20 10 03 91 6.2 -9 687.60 -56.5 -53.6 -56.6 61 -99 SPO 1997 04 20 10 04 93 6.4 -9 687.60 -56.5 -53.6 -56.6 61 -99 SPO 1997 04 20 10 05 94 6.3 -9 687.60 -56.5 -53.7 -56.6 61 -99 SPO 1997 04 20 10 06 95 6.4 -9 687.60 -56.6 -53.6 -56.6 62 -99 SPO 1997 04 20 10 07 93 5.7 -9 687.60 -56.6 -53.6 -56.7 60 -99 SPO 1997 04 20 10 08 93 5.9 -9 687.60 -56.6 -53.8 -56.7 60 -99 SPO 1997 04 20 10 09 92 5.9 -9 687.60 -56.6 -53.8 -56.6 60 -99 SPO 1997 04 20 10 10 94 6.2 -9 687.60 -56.6 -53.7 -56.6 62 -99 SPO 1997 04 20 10 11 94 6.3 -9 687.60 -56.4 -53.6 -56.5 61 -99 SPO 1997 04 20 10 12 95 6.1 -9 687.60 -56.3 -53.6 -56.5 61 -99 SPO 1997 04 20 10 13 94 5.8 -9 687.60 -56.4 -53.8 -56.5 63 -99 SPO 1997 04 20 10 14 94 6.2 -9 687.60 -56.4 -53.7 -56.5 63 -99 SPO 1997 04 20 10 15 92 5.9 -9 687.60 -56.4 -53.5 -56.5 61 -99 SPO 1997 04 20 10 16 91 5.7 -9 687.60 -56.3 -53.8 -56.4 61 -99 SPO 1997 04 20 10 17 94 5.8 -9 687.60 -56.2 -53.8 -56.4 61 -99 SPO 1997 04 20 10 18 94 6.1 -9 687.60 -56.3 -53.6 -56.5 61 -99 SPO 1997 04 20 10 19 94 6.0 -9 687.50 -56.4 -53.6 -56.5 61 -99 SPO 1997 04 20 10 20 96 6.1 -9 687.50 -56.4 -53.7 -56.5 61 -99 SPO 1997 04 20 10 21 96 6.1 -9 687.50 -56.4 -53.8 -56.5 61 -99 SPO 1997 04 20 10 22 96 6.3 -9 687.50 -56.5 -53.9 -56.6 62 -99 SPO 1997 04 20 10 23 96 6.8 -9 687.40 -56.5 -53.8 -56.6 62 -99 SPO 1997 04 20 10 24 96 6.8 -9 687.40 -56.5 -53.8 -56.6 62 -99 SPO 1997 04 20 10 25 95 6.7 -9 687.40 -56.5 -53.7 -56.5 64 -99 SPO 1997 04 20 10 26 94 6.4 -9 687.40 -56.5 -53.6 -56.5 64 -99 SPO 1997 04 20 10 27 95 6.5 -9 687.40 -56.4 -53.7 -56.5 63 -99 SPO 1997 04 20 10 28 95 6.8 -9 687.40 -56.3 -53.6 -56.5 62 -99 SPO 1997 04 20 10 29 96 6.6 -9 687.30 -56.4 -53.6 -56.6 61 -99 SPO 1997 04 20 10 30 92 6.4 -9 687.30 -56.5 -53.6 -56.6 61 -99 SPO 1997 04 20 10 31 92 6.2 -9 687.40 -56.4 -53.6 -56.5 61 -99 SPO 1997 04 20 10 32 91 6.3 -9 687.40 -56.4 -53.6 -56.5 61 -99 SPO 1997 04 20 10 33 93 6.0 -9 687.40 -56.4 -53.9 -56.5 61 -99 SPO 1997 04 20 10 34 94 6.1 -9 687.40 -56.4 -54.0 -56.6 61 -99 SPO 1997 04 20 10 35 94 6.1 -9 687.40 -56.5 -54.1 -56.6 61 -99 SPO 1997 04 20 10 36 95 6.3 -9 687.30 -56.5 -54.2 -56.6 61 -99 SPO 1997 04 20 10 37 93 6.1 -9 687.30 -56.5 -54.3 -56.6 62 -99 SPO 1997 04 20 10 38 91 5.4 -9 687.40 -56.5 -54.4 -56.6 62 -99 SPO 1997 04 20 10 39 91 5.4 -9 687.40 -56.6 -54.4 -56.6 62 -99 SPO 1997 04 20 10 40 92 5.4 -9 687.40 -56.5 -54.5 -56.5 61 -99 SPO 1997 04 20 10 41 92 5.5 -9 687.40 -56.5 -54.6 -56.5 61 -99 SPO 1997 04 20 10 42 93 5.5 -9 687.40 -56.5 -54.6 -56.5 61 -99 SPO 1997 04 20 10 43 93 5.6 -9 687.40 -56.4 -54.6 -56.5 61 -99 SPO 1997 04 20 10 44 94 5.5 -9 687.40 -56.3 -54.6 -56.4 60 -99 SPO 1997 04 20 10 45 91 5.3 -9 687.40 -56.2 -54.6 -56.4 61 -99 SPO 1997 04 20 10 46 91 5.4 -9 687.40 -56.2 -54.6 -56.3 61 -99 SPO 1997 04 20 10 47 91 5.3 -9 687.40 -56.2 -54.6 -56.3 61 -99 SPO 1997 04 20 10 48 91 5.4 -9 687.30 -56.2 -54.6 -56.3 63 -99 SPO 1997 04 20 10 49 90 5.4 -9 687.30 -56.1 -54.5 -56.2 62 -99 SPO 1997 04 20 10 50 90 5.5 -9 687.30 -56.1 -54.4 -56.2 62 -99 SPO 1997 04 20 10 51 88 5.2 -9 687.30 -56.1 -54.4 -56.2 61 -99 SPO 1997 04 20 10 52 87 5.2 -9 687.40 -56.1 -54.5 -56.2 61 -99 SPO 1997 04 20 10 53 87 5.9 -9 687.40 -56.0 -54.5 -56.1 60 -99 SPO 1997 04 20 10 54 86 6.1 -9 687.30 -56.0 -54.5 -56.1 61 -99 SPO 1997 04 20 10 55 86 6.3 -9 687.30 -56.0 -54.5 -56.0 61 -99 SPO 1997 04 20 10 56 86 6.5 -9 687.30 -56.0 -54.6 -56.1 61 -99 SPO 1997 04 20 10 57 87 6.7 -9 687.20 -56.0 -54.5 -56.2 62 -99 SPO 1997 04 20 10 58 84 6.5 -9 687.20 -56.0 -54.4 -56.2 62 -99 SPO 1997 04 20 10 59 83 6.3 -9 687.20 -56.0 -54.5 -56.1 62 -99 SPO 1997 04 20 11 00 82 6.4 -9 687.20 -56.1 -54.4 -56.1 63 0 SPO 1997 04 20 11 01 80 6.3 -9 687.20 -56.0 -54.4 -56.0 62 -99 SPO 1997 04 20 11 02 80 6.5 -9 687.20 -55.9 -54.4 -56.1 61 -99 SPO 1997 04 20 11 03 80 6.7 -9 687.20 -55.9 -54.3 -56.1 61 -99 SPO 1997 04 20 11 04 80 6.9 -9 687.20 -55.9 -54.3 -56.1 61 -99 SPO 1997 04 20 11 05 80 7.2 -9 687.10 -55.9 -54.3 -56.1 61 -99 SPO 1997 04 20 11 06 79 7.3 -9 687.10 -55.9 -54.2 -56.0 61 -99 SPO 1997 04 20 11 07 80 7.5 -9 687.10 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 08 80 7.4 -9 687.10 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 09 79 7.3 -9 687.10 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 10 78 7.0 -9 687.20 -56.0 -54.2 -56.0 64 -99 SPO 1997 04 20 11 11 78 6.9 -9 687.20 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 12 79 7.2 -9 687.10 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 13 80 7.2 -9 687.10 -55.9 -54.2 -56.0 63 -99 SPO 1997 04 20 11 14 79 7.4 -9 687.10 -56.0 -54.2 -56.0 64 -99 SPO 1997 04 20 11 15 79 7.1 -9 687.10 -56.0 -54.2 -56.1 64 -99 SPO 1997 04 20 11 16 78 7.3 -9 687.00 -56.0 -54.1 -56.1 62 -99 SPO 1997 04 20 11 17 78 6.9 -9 687.10 -56.0 -54.0 -56.1 62 -99 SPO 1997 04 20 11 18 77 6.6 -9 687.10 -56.0 -54.1 -56.1 62 -99 SPO 1997 04 20 11 19 78 6.7 -9 687.10 -56.0 -54.1 -56.2 62 -99 SPO 1997 04 20 11 20 79 7.0 -9 687.00 -56.0 -54.1 -56.2 62 -99 SPO 1997 04 20 11 21 80 7.2 -9 687.00 -56.1 -54.0 -56.2 64 -99 SPO 1997 04 20 11 22 81 7.3 -9 687.00 -56.1 -53.9 -56.2 64 -99 SPO 1997 04 20 11 23 78 7.0 -9 687.00 -56.1 -53.9 -56.2 64 -99 SPO 1997 04 20 11 24 78 6.2 -9 687.00 -56.1 -54.0 -56.2 63 -99 SPO 1997 04 20 11 25 77 6.3 -9 687.00 -56.1 -54.1 -56.2 62 -99 SPO 1997 04 20 11 26 77 6.4 -9 687.00 -56.2 -54.1 -56.3 63 -99 SPO 1997 04 20 11 27 79 6.5 -9 687.00 -56.2 -54.1 -56.3 63 -99 SPO 1997 04 20 11 28 81 6.7 -9 686.90 -56.3 -53.9 -56.4 64 -99 SPO 1997 04 20 11 29 80 6.2 -9 686.90 -56.3 -53.8 -56.4 64 -99 SPO 1997 04 20 11 30 78 5.9 -9 687.00 -56.3 -53.9 -56.3 64 -99 SPO 1997 04 20 11 31 78 5.7 -9 687.00 -56.3 -54.0 -56.3 64 -99 SPO 1997 04 20 11 32 79 6.1 -9 687.00 -56.2 -54.1 -56.4 63 -99 SPO 1997 04 20 11 33 81 6.7 -9 686.90 -56.2 -54.0 -56.4 63 -99 SPO 1997 04 20 11 34 79 6.5 -9 686.90 -56.4 -53.8 -56.5 64 -99 SPO 1997 04 20 11 35 77 5.8 -9 687.00 -56.4 -53.8 -56.5 64 -99 SPO 1997 04 20 11 36 77 5.7 -9 687.00 -56.4 -53.8 -56.4 64 -99 SPO 1997 04 20 11 37 78 5.6 -9 687.00 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 11 38 81 6.0 -9 686.90 -56.4 -53.7 -56.5 63 -99 SPO 1997 04 20 11 39 82 6.3 -9 686.90 -56.4 -53.6 -56.5 61 -99 SPO 1997 04 20 11 40 83 6.2 -9 686.90 -56.4 -53.7 -56.4 61 -99 SPO 1997 04 20 11 41 81 5.9 -9 686.90 -56.3 -53.7 -56.4 61 -99 SPO 1997 04 20 11 42 81 5.7 -9 686.90 -56.3 -53.7 -56.4 62 -99 SPO 1997 04 20 11 43 84 5.8 -9 686.90 -56.3 -53.8 -56.3 62 -99 SPO 1997 04 20 11 44 84 6.0 -9 686.90 -56.2 -53.7 -56.3 61 -99 SPO 1997 04 20 11 45 85 6.4 -9 686.90 -56.2 -53.7 -56.2 63 -99 SPO 1997 04 20 11 46 86 6.2 -9 686.90 -56.1 -53.8 -56.2 62 -99 SPO 1997 04 20 11 47 87 6.1 -9 686.90 -56.2 -53.9 -56.3 64 -99 SPO 1997 04 20 11 48 88 6.2 -9 686.90 -56.2 -53.9 -56.3 64 -99 SPO 1997 04 20 11 49 88 6.2 -9 686.90 -56.2 -53.9 -56.3 63 -99 SPO 1997 04 20 11 50 88 6.4 -9 686.90 -56.2 -54.0 -56.4 63 -99 SPO 1997 04 20 11 51 87 6.1 -9 686.90 -56.2 -54.0 -56.4 61 -99 SPO 1997 04 20 11 52 85 6.2 -9 686.90 -56.2 -54.0 -56.4 61 -99 SPO 1997 04 20 11 53 88 6.3 -9 686.90 -56.3 -53.9 -56.4 62 -99 SPO 1997 04 20 11 54 86 6.2 -9 686.80 -56.3 -53.9 -56.5 62 -99 SPO 1997 04 20 11 55 83 6.5 -9 686.80 -56.4 -53.8 -56.5 63 -99 SPO 1997 04 20 11 56 84 6.5 -9 686.80 -56.3 -53.7 -56.4 61 -99 SPO 1997 04 20 11 57 85 6.4 -9 686.80 -56.3 -53.7 -56.4 62 -99 SPO 1997 04 20 11 58 85 6.1 -9 686.80 -56.3 -53.9 -56.4 62 -99 SPO 1997 04 20 11 59 83 6.2 -9 686.80 -56.4 -54.0 -56.5 63 -99 SPO 1997 04 20 12 00 84 6.3 -9 686.80 -56.4 -54.0 -56.5 63 0 SPO 1997 04 20 12 01 84 6.5 -9 686.80 -56.4 -53.9 -56.5 61 -99 SPO 1997 04 20 12 02 85 6.2 -9 686.80 -56.5 -53.9 -56.6 61 -99 SPO 1997 04 20 12 03 87 6.2 -9 686.70 -56.5 -54.0 -56.5 61 -99 SPO 1997 04 20 12 04 88 6.5 -9 686.70 -56.4 -53.9 -56.6 61 -99 SPO 1997 04 20 12 05 86 6.2 -9 686.70 -56.5 -53.9 -56.6 61 -99 SPO 1997 04 20 12 06 85 6.4 -9 686.80 -56.6 -53.9 -56.7 62 -99 SPO 1997 04 20 12 07 87 6.3 -9 686.80 -56.6 -53.8 -56.7 62 -99 SPO 1997 04 20 12 08 86 6.3 -9 686.80 -56.6 -53.8 -56.8 62 -99 SPO 1997 04 20 12 09 84 6.2 -9 686.80 -56.7 -53.8 -56.8 63 -99 SPO 1997 04 20 12 10 83 6.2 -9 686.80 -56.7 -53.8 -56.8 63 -99 SPO 1997 04 20 12 11 83 6.4 -9 686.80 -56.7 -53.7 -56.8 63 -99 SPO 1997 04 20 12 12 83 6.2 -9 686.80 -56.7 -53.8 -56.8 61 -99 SPO 1997 04 20 12 13 82 6.4 -9 686.70 -56.6 -53.8 -56.7 60 -99 SPO 1997 04 20 12 14 82 6.6 -9 686.70 -56.7 -53.8 -56.7 61 -99 SPO 1997 04 20 12 15 82 6.5 -9 686.70 -56.6 -53.9 -56.6 60 -99 SPO 1997 04 20 12 16 82 6.1 -9 686.70 -56.7 -54.1 -56.7 61 -99 SPO 1997 04 20 12 17 81 5.9 -9 686.70 -56.8 -54.2 -56.8 62 -99 SPO 1997 04 20 12 18 82 5.8 -9 686.70 -56.8 -54.4 -56.8 62 -99 SPO 1997 04 20 12 19 81 5.8 -9 686.70 -56.8 -54.4 -57.0 62 -99 SPO 1997 04 20 12 20 80 5.8 -9 686.70 -56.8 -54.4 -57.0 62 -99 SPO 1997 04 20 12 21 80 5.4 -9 686.70 -57.0 -54.4 -57.1 63 -99 SPO 1997 04 20 12 22 81 5.8 -9 686.70 -57.0 -54.4 -57.2 62 -99 SPO 1997 04 20 12 23 81 5.8 -9 686.70 -57.1 -54.3 -57.2 62 -99 SPO 1997 04 20 12 24 79 5.7 -9 686.70 -57.2 -54.3 -57.3 63 -99 SPO 1997 04 20 12 25 78 5.2 -9 686.70 -57.2 -54.4 -57.3 61 -99 SPO 1997 04 20 12 26 77 5.4 -9 686.70 -57.2 -54.4 -57.3 61 -99 SPO 1997 04 20 12 27 78 5.5 -9 686.70 -57.2 -54.4 -57.3 61 -99 SPO 1997 04 20 12 28 78 5.8 -9 686.70 -57.2 -54.4 -57.3 61 -99 SPO 1997 04 20 12 29 79 5.9 -9 686.70 -57.2 -54.2 -57.3 61 -99 SPO 1997 04 20 12 30 79 5.7 -9 686.60 -57.2 -54.3 -57.2 61 -99 SPO 1997 04 20 12 31 76 5.6 -9 686.70 -57.2 -54.4 -57.2 63 -99 SPO 1997 04 20 12 32 76 5.7 -9 686.70 -57.1 -54.3 -57.2 62 -99 SPO 1997 04 20 12 33 76 6.0 -9 686.60 -57.0 -54.2 -57.0 61 -99 SPO 1997 04 20 12 34 76 5.9 -9 686.60 -56.9 -54.3 -57.0 61 -99 SPO 1997 04 20 12 35 75 6.0 -9 686.60 -56.8 -54.2 -57.0 60 -99 SPO 1997 04 20 12 36 74 6.2 -9 686.60 -56.9 -54.2 -57.0 61 -99 SPO 1997 04 20 12 37 74 6.2 -9 686.60 -56.9 -54.0 -57.0 61 -99 SPO 1997 04 20 12 38 73 6.2 -9 686.60 -56.9 -53.9 -57.0 61 -99 SPO 1997 04 20 12 39 71 6.2 -9 686.60 -56.9 -53.8 -57.0 61 -99 SPO 1997 04 20 12 40 71 6.2 -9 686.60 -56.8 -53.8 -57.0 62 -99 SPO 1997 04 20 12 41 71 6.5 -9 686.60 -56.9 -53.7 -57.0 63 -99 SPO 1997 04 20 12 42 71 6.3 -9 686.60 -56.8 -53.7 -57.0 62 -99 SPO 1997 04 20 12 43 72 6.2 -9 686.60 -56.8 -53.7 -57.0 62 -99 SPO 1997 04 20 12 44 72 6.1 -9 686.60 -56.8 -53.7 -56.9 62 -99 SPO 1997 04 20 12 45 72 5.9 -9 686.60 -56.8 -53.9 -56.9 62 -99 SPO 1997 04 20 12 46 72 5.8 -9 686.60 -56.8 -54.0 -56.9 62 -99 SPO 1997 04 20 12 47 72 5.5 -9 686.60 -56.8 -54.0 -56.9 62 -99 SPO 1997 04 20 12 48 72 5.5 -9 686.60 -56.7 -54.2 -56.9 60 -99 SPO 1997 04 20 12 49 74 5.5 -9 686.60 -56.8 -54.3 -56.9 60 -99 SPO 1997 04 20 12 50 75 5.6 -9 686.60 -56.9 -54.3 -57.0 61 -99 SPO 1997 04 20 12 51 74 5.3 -9 686.60 -56.9 -54.4 -57.0 61 -99 SPO 1997 04 20 12 52 74 5.3 -9 686.60 -56.9 -54.5 -57.1 61 -99 SPO 1997 04 20 12 53 74 5.5 -9 686.50 -57.0 -54.5 -57.2 62 -99 SPO 1997 04 20 12 54 76 5.4 -9 686.50 -57.1 -54.6 -57.2 62 -99 SPO 1997 04 20 12 55 76 5.4 -9 686.50 -57.2 -54.8 -57.4 63 -99 SPO 1997 04 20 12 56 75 5.4 -9 686.50 -57.3 -54.8 -57.5 63 -99 SPO 1997 04 20 12 57 75 5.5 -9 686.50 -57.4 -54.9 -57.6 63 -99 SPO 1997 04 20 12 58 75 5.3 -9 686.50 -57.6 -54.9 -57.7 64 -99 SPO 1997 04 20 12 59 75 5.3 -9 686.50 -57.7 -54.8 -57.8 63 -99 SPO 1997 04 20 13 00 76 5.4 -9 686.40 -57.8 -54.8 -57.8 62 0 SPO 1997 04 20 13 01 78 5.8 -9 686.40 -57.8 -54.6 -57.9 59 -99 SPO 1997 04 20 13 02 76 5.8 -9 686.40 -57.8 -54.5 -57.9 59 -99 SPO 1997 04 20 13 03 77 6.0 -9 686.40 -57.9 -54.4 -57.9 60 -99 SPO 1997 04 20 13 04 79 6.1 -9 686.30 -57.9 -54.3 -57.9 60 -99 SPO 1997 04 20 13 05 78 6.0 -9 686.30 -57.9 -54.3 -57.9 60 -99 SPO 1997 04 20 13 06 76 5.8 -9 686.30 -57.9 -54.5 -57.9 60 -99 SPO 1997 04 20 13 07 77 5.7 -9 686.30 -57.9 -54.4 -57.9 60 -99 SPO 1997 04 20 13 08 77 5.4 -9 686.30 -57.9 -54.4 -58.0 60 -99 SPO 1997 04 20 13 09 78 5.4 -9 686.30 -58.0 -54.5 -58.0 61 -99 SPO 1997 04 20 13 10 77 5.5 -9 686.30 -58.0 -54.5 -58.0 61 -99 SPO 1997 04 20 13 11 77 5.2 -9 686.30 -58.0 -54.5 -58.0 61 -99 SPO 1997 04 20 13 12 70 4.7 -9 686.40 -58.0 -54.7 -58.1 59 -99 SPO 1997 04 20 13 13 73 5.1 -9 686.40 -58.0 -54.4 -58.1 59 -99 SPO 1997 04 20 13 14 71 4.8 -9 686.40 -58.0 -54.0 -58.1 59 -99 SPO 1997 04 20 13 15 69 4.5 -9 686.40 -58.0 -54.2 -58.1 59 -99 SPO 1997 04 20 13 16 69 5.0 -9 686.40 -58.0 -54.3 -58.1 59 -99 SPO 1997 04 20 13 17 69 4.9 -9 686.40 -58.0 -54.2 -58.1 59 -99 SPO 1997 04 20 13 18 70 5.3 -9 686.40 -58.1 -54.3 -58.1 60 -99 SPO 1997 04 20 13 19 70 5.4 -9 686.30 -58.1 -54.4 -58.1 60 -99 SPO 1997 04 20 13 20 69 5.3 -9 686.30 -58.1 -54.3 -58.2 60 -99 SPO 1997 04 20 13 21 71 5.4 -9 686.30 -58.1 -54.2 -58.2 60 -99 SPO 1997 04 20 13 22 72 5.4 -9 686.30 -58.2 -54.1 -58.3 61 -99 SPO 1997 04 20 13 23 74 6.0 -9 686.30 -58.2 -53.9 -58.3 59 -99 SPO 1997 04 20 13 24 72 6.0 -9 686.30 -58.2 -53.8 -58.2 59 -99 SPO 1997 04 20 13 25 72 5.8 -9 686.20 -58.2 -53.8 -58.2 59 -99 SPO 1997 04 20 13 26 75 6.2 -9 686.20 -58.0 -53.8 -58.0 58 -99 SPO 1997 04 20 13 27 73 6.0 -9 686.20 -57.8 -53.7 -57.8 58 -99 SPO 1997 04 20 13 28 74 6.1 -9 686.20 -57.6 -53.8 -57.6 58 -99 SPO 1997 04 20 13 29 75 6.2 -9 686.20 -57.4 -53.8 -57.6 59 -99 SPO 1997 04 20 13 30 76 6.3 -9 686.20 -57.4 -53.6 -57.6 59 -99 SPO 1997 04 20 13 31 77 6.3 -9 686.20 -57.5 -53.6 -57.7 59 -99 SPO 1997 04 20 13 32 74 5.6 -9 686.20 -57.6 -53.6 -57.7 60 -99 SPO 1997 04 20 13 33 73 5.9 -9 686.20 -57.5 -53.7 -57.6 59 -99 SPO 1997 04 20 13 34 74 5.8 -9 686.20 -57.4 -53.5 -57.5 59 -99 SPO 1997 04 20 13 35 72 5.6 -9 686.20 -57.3 -53.6 -57.4 60 -99 SPO 1997 04 20 13 36 69 5.4 -9 686.30 -57.2 -53.6 -57.3 60 -99 SPO 1997 04 20 13 37 67 5.5 -9 686.30 -57.0 -53.7 -57.1 60 -99 SPO 1997 04 20 13 38 65 5.7 -9 686.20 -56.8 -53.6 -56.8 60 -99 SPO 1997 04 20 13 39 69 6.1 -9 686.20 -56.4 -53.6 -56.4 59 -99 SPO 1997 04 20 13 40 69 6.5 -9 686.10 -56.2 -53.5 -56.3 60 -99 SPO 1997 04 20 13 41 66 6.2 -9 686.10 -56.1 -53.5 -56.2 61 -99 SPO 1997 04 20 13 42 71 6.6 -9 686.10 -56.0 -53.5 -56.2 61 -99 SPO 1997 04 20 13 43 68 6.3 -9 686.10 -56.0 -53.4 -56.3 61 -99 SPO 1997 04 20 13 44 67 5.7 -9 686.20 -56.0 -53.4 -56.3 61 -99 SPO 1997 04 20 13 45 66 5.9 -9 686.20 -56.0 -53.6 -56.3 61 -99 SPO 1997 04 20 13 46 74 6.7 -9 686.20 -56.1 -53.3 -56.4 61 -99 SPO 1997 04 20 13 47 66 5.9 -9 686.10 -56.1 -53.3 -56.3 61 -99 SPO 1997 04 20 13 48 67 5.6 -9 686.10 -56.1 -53.7 -56.4 61 -99 SPO 1997 04 20 13 49 69 6.0 -9 686.10 -56.2 -53.6 -56.5 61 -99 SPO 1997 04 20 13 50 68 6.1 -9 686.10 -56.3 -53.6 -56.5 62 -99 SPO 1997 04 20 13 51 67 6.4 -9 686.10 -56.3 -53.6 -56.5 62 -99 SPO 1997 04 20 13 52 69 6.5 -9 686.10 -56.4 -53.7 -56.4 63 -99 SPO 1997 04 20 13 53 67 6.8 -9 686.10 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 13 54 68 6.8 -9 686.00 -56.3 -53.7 -56.4 62 -99 SPO 1997 04 20 13 55 70 7.2 -9 686.00 -56.4 -53.7 -56.4 63 -99 SPO 1997 04 20 13 56 69 6.9 -9 686.00 -56.4 -53.7 -56.4 63 -99 SPO 1997 04 20 13 57 69 7.0 -9 686.00 -56.3 -53.8 -56.5 62 -99 SPO 1997 04 20 13 58 68 7.1 -9 685.90 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 13 59 68 7.2 -9 685.90 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 14 00 70 7.1 -9 685.90 -56.3 -53.8 -56.4 62 0 SPO 1997 04 20 14 01 66 6.9 -9 685.90 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 14 02 70 7.2 -9 685.90 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 14 03 67 7.0 -9 685.90 -56.3 -53.8 -56.4 64 -99 SPO 1997 04 20 14 04 69 6.9 -9 685.90 -56.3 -53.8 -56.4 62 -99 SPO 1997 04 20 14 05 66 6.4 -9 685.90 -56.2 -53.9 -56.4 61 -99 SPO 1997 04 20 14 06 68 6.6 -9 685.90 -56.2 -54.0 -56.4 63 -99 SPO 1997 04 20 14 07 69 6.7 -9 685.90 -56.3 -54.0 -56.4 64 -99 SPO 1997 04 20 14 08 69 6.6 -9 685.80 -56.3 -53.9 -56.4 64 -99 SPO 1997 04 20 14 09 68 6.7 -9 685.80 -56.3 -53.9 -56.4 64 -99 SPO 1997 04 20 14 10 68 6.7 -9 685.80 -56.3 -53.9 -56.4 64 -99 SPO 1997 04 20 14 11 68 6.5 -9 685.80 -56.3 -54.0 -56.4 62 -99 SPO 1997 04 20 14 12 67 6.4 -9 685.80 -56.4 -53.9 -56.4 64 -99 SPO 1997 04 20 14 13 67 6.5 -9 685.80 -56.3 -53.9 -56.5 62 -99 SPO 1997 04 20 14 14 67 6.4 -9 685.80 -56.3 -53.9 -56.5 62 -99 SPO 1997 04 20 14 15 67 6.4 -9 685.80 -56.4 -53.9 -56.5 63 -99 SPO 1997 04 20 14 16 67 6.4 -9 685.80 -56.4 -53.9 -56.5 63 -99 SPO 1997 04 20 14 17 67 6.3 -9 685.80 -56.4 -53.9 -56.5 63 -99 SPO 1997 04 20 14 18 66 6.1 -9 685.80 -56.4 -54.0 -56.6 63 -99 SPO 1997 04 20 14 19 68 6.1 -9 685.80 -56.5 -53.9 -56.6 64 -99 SPO 1997 04 20 14 20 67 6.2 -9 685.80 -56.5 -53.9 -56.6 61 -99 SPO 1997 04 20 14 21 68 6.5 -9 685.80 -56.6 -53.9 -56.7 62 -99 SPO 1997 04 20 14 22 67 6.5 -9 685.80 -56.5 -53.8 -56.6 61 -99 SPO 1997 04 20 14 23 66 6.4 -9 685.70 -56.5 -53.9 -56.7 61 -99 SPO 1997 04 20 14 24 67 6.4 -9 685.70 -56.6 -53.8 -56.6 62 -99 SPO 1997 04 20 14 25 67 6.6 -9 685.70 -56.6 -53.8 -56.7 63 -99 SPO 1997 04 20 14 26 68 6.6 -9 685.70 -56.7 -53.8 -56.8 64 -99 SPO 1997 04 20 14 27 67 6.5 -9 685.70 -56.7 -53.8 -56.8 63 -99 SPO 1997 04 20 14 28 67 6.5 -9 685.70 -56.6 -53.8 -56.7 62 -99 SPO 1997 04 20 14 29 68 6.6 -9 685.70 -56.6 -53.8 -56.8 62 -99 SPO 1997 04 20 14 30 69 6.8 -9 685.70 -56.7 -53.8 -56.8 61 -99 SPO 1997 04 20 14 31 69 6.8 -9 685.70 -56.7 -53.7 -56.8 61 -99 SPO 1997 04 20 14 32 69 6.6 -9 685.70 -56.8 -53.7 -56.9 62 -99 SPO 1997 04 20 14 33 70 6.6 -9 685.60 -56.8 -53.8 -56.9 60 -99 SPO 1997 04 20 14 34 68 6.4 -9 685.60 -56.9 -53.8 -57.0 61 -99 SPO 1997 04 20 14 35 68 6.5 -9 685.60 -56.9 -53.7 -57.0 61 -99 SPO 1997 04 20 14 36 68 6.6 -9 685.60 -56.9 -53.6 -57.0 61 -99 SPO 1997 04 20 14 37 67 6.7 -9 685.60 -56.8 -53.6 -56.8 60 -99 SPO 1997 04 20 14 38 67 6.3 -9 685.60 -56.8 -53.8 -56.8 62 -99 SPO 1997 04 20 14 39 66 6.8 -9 685.60 -56.7 -53.8 -56.8 61 -99 SPO 1997 04 20 14 40 65 6.6 -9 685.60 -56.6 -53.8 -56.7 62 -99 SPO 1997 04 20 14 41 64 6.5 -9 685.60 -56.6 -53.9 -56.6 62 -99 SPO 1997 04 20 14 42 65 6.6 -9 685.60 -56.6 -54.0 -56.6 62 -99 SPO 1997 04 20 14 43 66 6.5 -9 685.60 -56.6 -54.0 -56.6 62 -99 SPO 1997 04 20 14 44 66 6.3 -9 685.60 -56.5 -53.9 -56.6 61 -99 SPO 1997 04 20 14 45 66 6.3 -9 685.60 -56.4 -53.9 -56.5 61 -99 SPO 1997 04 20 14 46 66 6.2 -9 685.60 -56.3 -53.9 -56.4 61 -99 SPO 1997 04 20 14 47 65 6.2 -9 685.60 -56.3 -54.0 -56.4 62 -99 SPO 1997 04 20 14 48 66 6.5 -9 685.60 -56.2 -54.0 -56.4 61 -99 SPO 1997 04 20 14 49 65 6.4 -9 685.60 -56.2 -54.1 -56.3 63 -99 SPO 1997 04 20 14 50 65 6.3 -9 685.60 -56.1 -54.2 -56.2 62 -99 SPO 1997 04 20 14 51 67 6.1 -9 685.60 -56.1 -54.2 -56.2 62 -99 SPO 1997 04 20 14 52 69 6.3 -9 685.60 -56.1 -54.0 -56.2 62 -99 SPO 1997 04 20 14 53 70 6.2 -9 685.60 -56.0 -54.0 -56.2 61 -99 SPO 1997 04 20 14 54 71 6.4 -9 685.50 -56.0 -54.1 -56.2 60 -99 SPO 1997 04 20 14 55 71 6.3 -9 685.50 -56.1 -54.1 -56.2 61 -99 SPO 1997 04 20 14 56 71 6.4 -9 685.50 -56.0 -54.2 -56.2 60 -99 SPO 1997 04 20 14 57 71 6.3 -9 685.50 -56.0 -54.2 -56.1 61 -99 SPO 1997 04 20 14 58 71 6.2 -9 685.50 -56.0 -54.2 -56.1 61 -99 SPO 1997 04 20 14 59 71 6.0 -9 685.50 -56.0 -54.2 -56.2 61 -99 SPO 1997 04 20 15 00 70 6.0 -9 685.50 -56.1 -54.2 -56.2 62 0 SPO 1997 04 20 15 01 71 6.1 -9 685.50 -56.1 -54.2 -56.2 63 -99 SPO 1997 04 20 15 02 72 6.0 -9 685.50 -56.1 -54.2 -56.3 63 -99 SPO 1997 04 20 15 03 72 6.0 -9 685.50 -56.1 -54.2 -56.3 62 -99 SPO 1997 04 20 15 04 72 5.7 -9 685.50 -56.2 -54.2 -56.3 63 -99 SPO 1997 04 20 15 05 71 5.7 -9 685.50 -56.2 -54.3 -56.4 63 -99 SPO 1997 04 20 15 06 72 5.7 -9 685.50 -56.2 -54.3 -56.4 61 -99 SPO 1997 04 20 15 07 73 5.7 -9 685.50 -56.2 -54.2 -56.3 61 -99 SPO 1997 04 20 15 08 71 5.5 -9 685.50 -56.2 -54.3 -56.4 61 -99 SPO 1997 04 20 15 09 73 5.6 -9 685.50 -56.3 -54.3 -56.4 62 -99 SPO 1997 04 20 15 10 72 5.8 -9 685.50 -56.3 -54.4 -56.4 62 -99 SPO 1997 04 20 15 11 73 5.8 -9 685.50 -56.3 -54.4 -56.4 62 -99 SPO 1997 04 20 15 12 73 5.7 -9 685.50 -56.3 -54.5 -56.4 62 -99 SPO 1997 04 20 15 13 73 5.8 -9 685.50 -56.4 -54.6 -56.5 63 -99 SPO 1997 04 20 15 14 75 5.9 -9 685.50 -56.4 -54.6 -56.5 63 -99 SPO 1997 04 20 15 15 74 5.8 -9 685.40 -56.5 -54.6 -56.6 64 -99 SPO 1997 04 20 15 16 74 5.9 -9 685.50 -56.6 -54.5 -56.6 64 -99 SPO 1997 04 20 15 17 75 5.9 -9 685.40 -56.5 -54.5 -56.6 62 -99 SPO 1997 04 20 15 18 74 5.6 -9 685.40 -56.5 -54.6 -56.6 61 -99 SPO 1997 04 20 15 19 73 5.5 -9 685.40 -56.5 -54.6 -56.6 61 -99 SPO 1997 04 20 15 20 72 5.3 -9 685.50 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 21 73 5.3 -9 685.50 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 22 72 5.2 -9 685.50 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 23 73 5.3 -9 685.50 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 24 73 5.2 -9 685.40 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 25 73 5.5 -9 685.40 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 26 74 5.4 -9 685.40 -56.6 -54.7 -56.7 62 -99 SPO 1997 04 20 15 27 75 5.6 -9 685.40 -56.6 -54.8 -56.7 62 -99 SPO 1997 04 20 15 28 75 5.7 -9 685.40 -56.6 -54.8 -56.7 62 -99 SPO 1997 04 20 15 29 74 5.8 -9 685.40 -56.7 -54.8 -56.7 61 -99 SPO 1997 04 20 15 30 73 5.6 -9 685.40 -56.7 -54.9 -56.8 61 -99 SPO 1997 04 20 15 31 73 5.7 -9 685.30 -56.7 -54.9 -56.8 61 -99 SPO 1997 04 20 15 32 72 5.5 -9 685.30 -56.8 -55.0 -56.8 62 -99 SPO 1997 04 20 15 33 72 5.6 -9 685.30 -56.6 -55.0 -56.8 60 -99 SPO 1997 04 20 15 34 71 5.6 -9 685.30 -56.6 -55.0 -56.8 60 -99 SPO 1997 04 20 15 35 71 5.4 -9 685.30 -56.7 -55.0 -56.8 63 -99 SPO 1997 04 20 15 36 71 5.5 -9 685.30 -56.7 -55.0 -56.8 63 -99 SPO 1997 04 20 15 37 72 5.3 -9 685.30 -56.7 -55.0 -56.8 63 -99 SPO 1997 04 20 15 38 71 5.3 -9 685.30 -56.7 -55.0 -56.8 63 -99 SPO 1997 04 20 15 39 70 5.4 -9 685.30 -56.7 -55.0 -56.8 61 -99 SPO 1997 04 20 15 40 72 5.4 -9 685.30 -56.7 -54.9 -56.8 61 -99 SPO 1997 04 20 15 41 72 5.5 -9 685.30 -56.7 -54.8 -56.8 61 -99 SPO 1997 04 20 15 42 73 5.5 -9 685.30 -56.7 -54.8 -56.8 61 -99 SPO 1997 04 20 15 43 72 5.5 -9 685.30 -56.7 -54.8 -56.8 61 -99 SPO 1997 04 20 15 44 72 5.6 -9 685.30 -56.8 -54.9 -56.9 62 -99 SPO 1997 04 20 15 45 71 5.5 -9 685.30 -56.7 -54.8 -56.9 61 -99 SPO 1997 04 20 15 46 71 5.7 -9 685.30 -56.8 -54.8 -56.9 64 -99 SPO 1997 04 20 15 47 70 5.4 -9 685.30 -56.9 -54.8 -56.9 64 -99 SPO 1997 04 20 15 48 69 5.6 -9 685.30 -56.8 -54.8 -56.9 64 -99 SPO 1997 04 20 15 49 70 5.7 -9 685.30 -56.8 -54.8 -56.9 64 -99 SPO 1997 04 20 15 50 70 5.8 -9 685.30 -56.8 -54.8 -57.0 62 -99 SPO 1997 04 20 15 51 70 5.8 -9 685.30 -56.9 -54.7 -57.0 63 -99 SPO 1997 04 20 15 52 69 5.6 -9 685.30 -56.9 -54.7 -57.0 63 -99 SPO 1997 04 20 15 53 69 5.7 -9 685.30 -56.9 -54.7 -57.0 61 -99 SPO 1997 04 20 15 54 69 5.7 -9 685.30 -56.9 -54.7 -57.0 61 -99 SPO 1997 04 20 15 55 70 5.8 -9 685.30 -56.9 -54.7 -57.0 60 -99 SPO 1997 04 20 15 56 69 5.9 -9 685.30 -56.9 -54.7 -57.0 60 -99 SPO 1997 04 20 15 57 69 6.0 -9 685.30 -56.9 -54.7 -57.0 61 -99 SPO 1997 04 20 15 58 69 6.0 -9 685.30 -56.9 -54.7 -57.0 61 -99 SPO 1997 04 20 15 59 68 6.0 -9 685.30 -56.9 -54.8 -57.0 61 -99 SPO 1997 04 20 16 00 68 6.0 -9 685.30 -57.0 -54.8 -57.1 62 0 SPO 1997 04 20 16 01 68 6.0 -9 685.30 -57.0 -54.8 -57.1 63 -99 SPO 1997 04 20 16 02 69 6.0 -9 685.20 -57.0 -54.8 -57.1 63 -99 SPO 1997 04 20 16 03 69 6.0 -9 685.20 -57.0 -54.8 -57.1 62 -99 SPO 1997 04 20 16 04 71 6.1 -9 685.20 -57.1 -54.7 -57.2 63 -99 SPO 1997 04 20 16 05 71 5.9 -9 685.20 -57.1 -54.7 -57.2 62 -99 SPO 1997 04 20 16 06 71 5.7 -9 685.20 -57.1 -54.7 -57.2 62 -99 SPO 1997 04 20 16 07 72 5.6 -9 685.20 -57.1 -54.7 -57.2 62 -99 SPO 1997 04 20 16 08 73 5.5 -9 685.20 -57.1 -54.8 -57.2 62 -99 SPO 1997 04 20 16 09 72 5.4 -9 685.20 -57.1 -54.8 -57.2 62 -99 SPO 1997 04 20 16 10 72 5.4 -9 685.20 -57.2 -54.8 -57.3 63 -99 SPO 1997 04 20 16 11 71 5.3 -9 685.20 -57.2 -54.9 -57.3 63 -99 SPO 1997 04 20 16 12 70 5.0 -9 685.20 -57.2 -54.9 -57.3 63 -99 SPO 1997 04 20 16 13 69 5.2 -9 685.20 -57.3 -54.9 -57.4 62 -99 SPO 1997 04 20 16 14 70 5.2 -9 685.10 -57.4 -54.9 -57.4 63 -99 SPO 1997 04 20 16 15 71 5.2 -9 685.10 -57.4 -55.0 -57.5 61 -99 SPO 1997 04 20 16 16 71 5.4 -9 685.10 -57.5 -55.1 -57.6 62 -99 SPO 1997 04 20 16 17 72 5.5 -9 685.10 -57.5 -55.2 -57.6 61 -99 SPO 1997 04 20 16 18 72 5.2 -9 685.10 -57.6 -55.2 -57.6 62 -99 SPO 1997 04 20 16 19 72 5.0 -9 685.10 -57.6 -55.2 -57.6 62 -99 SPO 1997 04 20 16 20 72 5.0 -9 685.10 -57.7 -55.1 -57.7 63 -99 SPO 1997 04 20 16 21 72 5.0 -9 685.10 -57.7 -55.2 -57.7 63 -99 SPO 1997 04 20 16 22 71 5.1 -9 685.10 -57.7 -55.1 -57.7 63 -99 SPO 1997 04 20 16 23 71 5.1 -9 685.10 -57.7 -55.2 -57.7 63 -99 SPO 1997 04 20 16 24 71 5.0 -9 685.10 -57.7 -55.2 -57.8 63 -99 SPO 1997 04 20 16 25 71 5.1 -9 685.10 -57.7 -55.3 -57.8 63 -99 SPO 1997 04 20 16 26 70 5.0 -9 685.00 -57.8 -55.3 -57.8 62 -99 SPO 1997 04 20 16 27 69 4.9 -9 685.10 -57.8 -55.3 -57.9 62 -99 SPO 1997 04 20 16 28 67 4.7 -9 685.10 -57.8 -55.4 -57.9 62 -99 SPO 1997 04 20 16 29 67 4.6 -9 685.10 -57.8 -55.4 -57.9 59 -99 SPO 1997 04 20 16 30 68 4.8 -9 685.10 -57.8 -55.4 -57.9 59 -99 SPO 1997 04 20 16 31 67 4.9 -9 685.00 -57.9 -55.4 -57.9 60 -99 SPO 1997 04 20 16 32 66 5.0 -9 685.00 -57.9 -55.4 -58.0 60 -99 SPO 1997 04 20 16 33 65 5.0 -9 685.00 -57.9 -55.5 -58.0 61 -99 SPO 1997 04 20 16 34 63 4.9 -9 685.00 -57.9 -55.5 -58.0 61 -99 SPO 1997 04 20 16 35 61 4.8 -9 685.00 -57.9 -55.5 -58.0 61 -99 SPO 1997 04 20 16 36 60 4.8 -9 685.00 -57.9 -55.5 -58.0 61 -99 SPO 1997 04 20 16 37 58 5.0 -9 685.00 -57.9 -55.5 -57.9 61 -99 SPO 1997 04 20 16 38 57 5.2 -9 685.00 -57.8 -55.4 -57.8 60 -99 SPO 1997 04 20 16 39 57 5.3 -9 685.00 -57.6 -55.3 -57.6 59 -99 SPO 1997 04 20 16 40 55 5.4 -9 685.00 -57.4 -55.2 -57.4 59 -99 SPO 1997 04 20 16 41 56 5.6 -9 685.00 -57.2 -55.1 -57.2 59 -99 SPO 1997 04 20 16 42 57 5.6 -9 685.00 -57.1 -55.0 -57.1 60 -99 SPO 1997 04 20 16 43 57 5.8 -9 685.00 -57.0 -55.0 -57.1 61 -99 SPO 1997 04 20 16 44 58 5.8 -9 685.00 -56.9 -55.0 -57.1 60 -99 SPO 1997 04 20 16 45 57 5.9 -9 685.00 -56.9 -55.0 -57.0 60 -99 SPO 1997 04 20 16 46 57 5.7 -9 685.00 -56.8 -54.9 -57.0 60 -99 SPO 1997 04 20 16 47 57 5.8 -9 685.00 -56.7 -55.0 -56.8 60 -99 SPO 1997 04 20 16 48 58 6.0 -9 685.00 -56.6 -55.0 -56.8 60 -99 SPO 1997 04 20 16 49 57 5.9 -9 685.00 -56.6 -54.9 -56.7 62 -99 SPO 1997 04 20 16 50 58 6.1 -9 685.00 -56.5 -54.8 -56.6 61 -99 SPO 1997 04 20 16 51 59 6.1 -9 684.90 -56.5 -54.8 -56.6 61 -99 SPO 1997 04 20 16 52 60 6.1 -9 684.90 -56.4 -54.8 -56.6 61 -99 SPO 1997 04 20 16 53 60 6.1 -9 684.90 -56.4 -54.8 -56.5 61 -99 SPO 1997 04 20 16 54 60 6.3 -9 684.90 -56.3 -54.7 -56.5 60 -99 SPO 1997 04 20 16 55 58 6.0 -9 684.90 -56.3 -54.7 -56.5 60 -99 SPO 1997 04 20 16 56 57 6.0 -9 684.90 -56.2 -54.7 -56.4 60 -99 SPO 1997 04 20 16 57 56 5.8 -9 684.90 -56.2 -54.6 -56.4 61 -99 SPO 1997 04 20 16 58 56 5.8 -9 684.90 -56.2 -54.6 -56.4 61 -99 SPO 1997 04 20 16 59 54 6.1 -9 684.90 -56.2 -54.7 -56.3 63 -99 SPO 1997 04 20 17 00 55 6.0 -9 684.90 -56.1 -54.7 -56.2 62 0 SPO 1997 04 20 17 01 56 6.1 -9 684.90 -56.1 -54.6 -56.3 62 -99 SPO 1997 04 20 17 02 56 6.3 -9 684.80 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 03 56 6.8 -9 684.80 -56.1 -54.6 -56.3 62 -99 SPO 1997 04 20 17 04 56 6.7 -9 684.80 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 05 56 6.6 -9 684.80 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 06 56 6.5 -9 684.70 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 07 56 6.8 -9 684.70 -56.1 -54.6 -56.2 63 -99 SPO 1997 04 20 17 08 56 6.5 -9 684.70 -56.1 -54.6 -56.1 63 -99 SPO 1997 04 20 17 09 56 6.6 -9 684.70 -56.0 -54.6 -56.1 64 -99 SPO 1997 04 20 17 10 57 6.4 -9 684.70 -56.0 -54.6 -56.1 64 -99 SPO 1997 04 20 17 11 58 6.3 -9 684.70 -56.0 -54.6 -56.1 64 -99 SPO 1997 04 20 17 12 59 6.5 -9 684.70 -56.0 -54.6 -56.1 64 -99 SPO 1997 04 20 17 13 59 6.6 -9 684.70 -56.0 -54.6 -56.2 64 -99 SPO 1997 04 20 17 14 60 6.5 -9 684.70 -56.0 -54.6 -56.1 64 -99 SPO 1997 04 20 17 15 61 6.6 -9 684.70 -56.0 -54.6 -56.2 62 -99 SPO 1997 04 20 17 16 61 6.4 -9 684.70 -56.0 -54.7 -56.1 62 -99 SPO 1997 04 20 17 17 61 6.4 -9 684.70 -56.0 -54.8 -56.2 61 -99 SPO 1997 04 20 17 18 62 6.4 -9 684.70 -56.1 -54.7 -56.2 63 -99 SPO 1997 04 20 17 19 61 6.3 -9 684.70 -56.1 -54.8 -56.2 63 -99 SPO 1997 04 20 17 20 62 6.2 -9 684.70 -56.1 -54.9 -56.2 63 -99 SPO 1997 04 20 17 21 62 6.1 -9 684.70 -56.2 -55.0 -56.3 64 -99 SPO 1997 04 20 17 22 63 6.2 -9 684.70 -56.2 -55.0 -56.3 63 -99 SPO 1997 04 20 17 23 62 6.1 -9 684.70 -56.2 -55.0 -56.3 63 -99 SPO 1997 04 20 17 24 62 6.1 -9 684.70 -56.2 -55.0 -56.3 63 -99 SPO 1997 04 20 17 25 62 6.0 -9 684.70 -56.3 -55.0 -56.4 64 -99 SPO 1997 04 20 17 26 61 6.0 -9 684.70 -56.3 -55.0 -56.3 64 -99 SPO 1997 04 20 17 27 61 6.0 -9 684.70 -56.2 -54.9 -56.3 61 -99 SPO 1997 04 20 17 28 60 6.1 -9 684.70 -56.2 -54.9 -56.3 61 -99 SPO 1997 04 20 17 29 60 5.9 -9 684.70 -56.2 -54.9 -56.4 61 -99 SPO 1997 04 20 17 30 61 5.9 -9 684.70 -56.2 -54.8 -56.3 61 -99 SPO 1997 04 20 17 31 61 5.9 -9 684.70 -56.3 -54.8 -56.4 62 -99 SPO 1997 04 20 17 32 61 5.7 -9 684.70 -56.3 -54.8 -56.4 62 -99 SPO 1997 04 20 17 33 61 5.7 -9 684.70 -56.2 -54.8 -56.3 61 -99 SPO 1997 04 20 17 34 61 5.5 -9 684.70 -56.2 -54.8 -56.3 63 -99 SPO 1997 04 20 17 35 61 5.5 -9 684.70 -56.2 -54.8 -56.3 61 -99 SPO 1997 04 20 17 36 61 5.3 -9 684.70 -56.2 -54.9 -56.3 61 -99 SPO 1997 04 20 17 37 62 5.1 -9 684.70 -56.3 -55.0 -56.4 62 -99 SPO 1997 04 20 17 38 62 5.2 -9 684.70 -56.3 -55.0 -56.4 62 -99 SPO 1997 04 20 17 39 63 5.0 -9 684.70 -56.3 -55.0 -56.4 62 -99 SPO 1997 04 20 17 40 64 5.1 -9 684.70 -56.3 -55.0 -56.4 62 -99 SPO 1997 04 20 17 41 63 5.0 -9 684.70 -56.4 -54.9 -56.5 63 -99 SPO 1997 04 20 17 42 63 5.1 -9 684.70 -56.4 -54.9 -56.5 63 -99 SPO 1997 04 20 17 43 62 5.3 -9 684.70 -56.4 -54.9 -56.5 63 -99 SPO 1997 04 20 17 44 61 5.5 -9 684.70 -56.4 -54.8 -56.5 63 -99 SPO 1997 04 20 17 45 59 5.4 -9 684.70 -56.4 -54.8 -56.5 63 -99 SPO 1997 04 20 17 46 57 5.6 -9 684.70 -56.4 -54.7 -56.4 64 -99 SPO 1997 04 20 17 47 57 5.6 -9 684.70 -56.3 -54.6 -56.4 64 -99 SPO 1997 04 20 17 48 58 5.6 -9 684.70 -56.3 -54.6 -56.4 64 -99 SPO 1997 04 20 17 49 57 5.8 -9 684.70 -56.3 -54.6 -56.3 62 -99 SPO 1997 04 20 17 50 55 5.7 -9 684.70 -56.2 -54.6 -56.3 61 -99 SPO 1997 04 20 17 51 55 5.7 -9 684.70 -56.2 -54.5 -56.2 61 -99 SPO 1997 04 20 17 52 56 5.7 -9 684.60 -56.1 -54.6 -56.2 61 -99 SPO 1997 04 20 17 53 56 5.4 -9 684.70 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 54 58 5.7 -9 684.60 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 55 58 5.8 -9 684.60 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 17 56 57 5.5 -9 684.70 -56.1 -54.6 -56.2 63 -99 SPO 1997 04 20 17 57 59 5.5 -9 684.60 -56.1 -54.6 -56.2 63 -99 SPO 1997 04 20 17 58 60 5.7 -9 684.60 -56.2 -54.6 -56.3 64 -99 SPO 1997 04 20 17 59 60 5.4 -9 684.60 -56.2 -54.6 -56.2 64 -99 SPO 1997 04 20 18 00 60 5.4 -9 684.70 -56.2 -54.6 -56.2 63 0 SPO 1997 04 20 18 01 62 5.6 -9 684.60 -56.1 -54.6 -56.2 62 -99 SPO 1997 04 20 18 02 63 5.6 -9 684.60 -56.1 -54.6 -56.3 62 -99 SPO 1997 04 20 18 03 62 5.5 -9 684.60 -56.2 -54.6 -56.3 63 -99 SPO 1997 04 20 18 04 61 5.4 -9 684.60 -56.2 -54.6 -56.4 63 -99 SPO 1997 04 20 18 05 61 5.2 -9 684.60 -56.3 -54.6 -56.4 64 -99 SPO 1997 04 20 18 06 61 5.3 -9 684.60 -56.3 -54.6 -56.4 64 -99 SPO 1997 04 20 18 07 61 5.4 -9 684.60 -56.3 -54.6 -56.3 64 -99 SPO 1997 04 20 18 08 61 5.0 -9 684.60 -56.3 -54.7 -56.4 64 -99 SPO 1997 04 20 18 09 61 5.0 -9 684.60 -56.3 -54.8 -56.4 64 -99 SPO 1997 04 20 18 10 62 4.8 -9 684.60 -56.4 -54.8 -56.5 64 -99 SPO 1997 04 20 18 11 62 4.6 -9 684.60 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 12 62 4.6 -9 684.60 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 13 61 4.8 -9 684.60 -56.6 -55.0 -56.7 63 -99 SPO 1997 04 20 18 14 62 4.7 -9 684.60 -56.7 -55.0 -56.7 63 -99 SPO 1997 04 20 18 15 62 4.5 -9 684.60 -56.6 -55.0 -56.8 62 -99 SPO 1997 04 20 18 16 61 4.6 -9 684.60 -56.7 -54.9 -56.8 63 -99 SPO 1997 04 20 18 17 61 4.8 -9 684.60 -56.8 -54.9 -56.8 64 -99 SPO 1997 04 20 18 18 62 5.0 -9 684.50 -56.8 -54.9 -56.9 64 -99 SPO 1997 04 20 18 19 63 5.0 -9 684.50 -56.8 -54.9 -56.8 64 -99 SPO 1997 04 20 18 20 63 5.0 -9 684.50 -56.8 -54.9 -56.8 64 -99 SPO 1997 04 20 18 21 61 5.0 -9 684.50 -56.8 -54.9 -56.9 64 -99 SPO 1997 04 20 18 22 61 5.1 -9 684.50 -56.9 -54.9 -57.0 64 -99 SPO 1997 04 20 18 23 61 5.1 -9 684.50 -56.9 -54.9 -57.0 63 -99 SPO 1997 04 20 18 24 59 5.2 -9 684.50 -56.9 -54.9 -57.0 63 -99 SPO 1997 04 20 18 25 60 5.2 -9 684.40 -56.9 -54.9 -57.0 63 -99 SPO 1997 04 20 18 26 60 5.2 -9 684.40 -56.9 -54.9 -56.9 63 -99 SPO 1997 04 20 18 27 60 5.3 -9 684.40 -56.8 -54.9 -56.9 62 -99 SPO 1997 04 20 18 28 60 5.2 -9 684.40 -56.9 -55.0 -56.9 63 -99 SPO 1997 04 20 18 29 59 5.0 -9 684.40 -56.9 -55.0 -56.9 63 -99 SPO 1997 04 20 18 30 58 5.0 -9 684.40 -56.8 -55.1 -56.8 64 -99 SPO 1997 04 20 18 31 59 4.8 -9 684.40 -56.7 -55.1 -56.8 63 -99 SPO 1997 04 20 18 32 58 4.9 -9 684.40 -56.7 -55.1 -56.8 63 -99 SPO 1997 04 20 18 33 58 5.4 -9 684.40 -56.7 -55.1 -56.8 63 -99 SPO 1997 04 20 18 34 60 5.3 -9 684.40 -56.7 -55.0 -56.7 64 -99 SPO 1997 04 20 18 35 60 5.3 -9 684.40 -56.6 -55.0 -56.8 63 -99 SPO 1997 04 20 18 36 59 5.5 -9 684.40 -56.6 -55.0 -56.8 62 -99 SPO 1997 04 20 18 37 58 5.5 -9 684.40 -56.6 -55.0 -56.7 62 -99 SPO 1997 04 20 18 38 58 5.5 -9 684.30 -56.6 -55.0 -56.7 63 -99 SPO 1997 04 20 18 39 58 5.8 -9 684.30 -56.6 -54.9 -56.7 63 -99 SPO 1997 04 20 18 40 58 5.8 -9 684.30 -56.6 -54.9 -56.7 62 -99 SPO 1997 04 20 18 41 58 5.9 -9 684.30 -56.5 -54.9 -56.6 61 -99 SPO 1997 04 20 18 42 58 5.9 -9 684.30 -56.5 -54.9 -56.6 62 -99 SPO 1997 04 20 18 43 59 6.1 -9 684.30 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 44 59 6.2 -9 684.30 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 45 58 6.2 -9 684.30 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 46 58 5.9 -9 684.30 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 47 58 5.9 -9 684.30 -56.5 -54.9 -56.6 64 -99 SPO 1997 04 20 18 48 59 6.0 -9 684.30 -56.4 -54.9 -56.6 63 -99 SPO 1997 04 20 18 49 59 6.3 -9 684.30 -56.4 -54.8 -56.6 63 -99 SPO 1997 04 20 18 50 59 6.3 -9 684.30 -56.5 -54.8 -56.6 64 -99 SPO 1997 04 20 18 51 60 6.4 -9 684.20 -56.5 -54.8 -56.6 64 -99 SPO 1997 04 20 18 52 59 6.4 -9 684.20 -56.5 -54.8 -56.6 64 -99 SPO 1997 04 20 18 53 59 6.2 -9 684.20 -56.5 -54.8 -56.6 64 -99 SPO 1997 04 20 18 54 59 6.3 -9 684.20 -56.5 -54.7 -56.7 64 -99 SPO 1997 04 20 18 55 59 6.3 -9 684.20 -56.6 -54.7 -56.7 64 -99 SPO 1997 04 20 18 56 60 6.1 -9 684.20 -56.6 -54.7 -56.6 63 -99 SPO 1997 04 20 18 57 59 6.0 -9 684.20 -56.6 -54.8 -56.7 63 -99 SPO 1997 04 20 18 58 59 6.0 -9 684.20 -56.6 -54.8 -56.7 62 -99 SPO 1997 04 20 18 59 60 6.1 -9 684.20 -56.6 -54.8 -56.7 62 -99 SPO 1997 04 20 19 00 61 6.1 -9 684.20 -56.7 -54.8 -56.8 63 0 SPO 1997 04 20 19 01 62 6.3 -9 684.20 -56.7 -54.8 -56.8 63 -99 SPO 1997 04 20 19 02 63 6.2 -9 684.20 -56.7 -54.8 -56.8 63 -99 SPO 1997 04 20 19 03 64 6.2 -9 684.20 -56.7 -54.7 -56.8 63 -99 SPO 1997 04 20 19 04 64 6.0 -9 684.10 -56.7 -54.8 -56.9 63 -99 SPO 1997 04 20 19 05 65 5.8 -9 684.20 -56.8 -54.8 -56.9 64 -99 SPO 1997 04 20 19 06 66 5.8 -9 684.20 -56.8 -54.9 -57.0 64 -99 SPO 1997 04 20 19 07 68 5.7 -9 684.20 -56.9 -55.0 -57.0 64 -99 SPO 1997 04 20 19 08 68 5.6 -9 684.20 -56.9 -55.0 -57.0 64 -99 SPO 1997 04 20 19 09 68 5.6 -9 684.20 -57.0 -55.1 -57.0 63 -99 SPO 1997 04 20 19 10 67 5.6 -9 684.20 -57.0 -55.1 -57.1 63 -99 SPO 1997 04 20 19 11 66 5.6 -9 684.20 -57.0 -55.1 -57.1 63 -99 SPO 1997 04 20 19 12 66 5.6 -9 684.20 -57.0 -55.1 -57.1 62 -99 SPO 1997 04 20 19 13 65 5.5 -9 684.20 -57.0 -55.2 -57.1 61 -99 SPO 1997 04 20 19 14 64 5.5 -9 684.20 -57.1 -55.2 -57.1 62 -99 SPO 1997 04 20 19 15 64 5.4 -9 684.20 -57.1 -55.3 -57.2 63 -99 SPO 1997 04 20 19 16 65 5.2 -9 684.20 -57.0 -55.3 -57.2 62 -99 SPO 1997 04 20 19 17 64 5.2 -9 684.20 -57.0 -55.4 -57.2 63 -99 SPO 1997 04 20 19 18 63 4.8 -9 684.20 -57.1 -55.5 -57.2 64 -99 SPO 1997 04 20 19 19 63 5.1 -9 684.20 -57.2 -55.5 -57.2 65 -99 SPO 1997 04 20 19 20 63 5.1 -9 684.20 -57.2 -55.5 -57.2 65 -99 SPO 1997 04 20 19 21 62 5.2 -9 684.20 -57.2 -55.5 -57.3 63 -99 SPO 1997 04 20 19 22 62 5.3 -9 684.20 -57.2 -55.4 -57.2 63 -99 SPO 1997 04 20 19 23 60 5.5 -9 684.20 -57.2 -55.4 -57.2 63 -99 SPO 1997 04 20 19 24 60 5.3 -9 684.20 -57.1 -55.4 -57.2 62 -99 SPO 1997 04 20 19 25 60 5.5 -9 684.20 -57.1 -55.4 -57.2 62 -99 SPO 1997 04 20 19 26 62 5.5 -9 684.20 -57.1 -55.2 -57.2 63 -99 SPO 1997 04 20 19 27 63 5.7 -9 684.20 -57.1 -55.2 -57.2 62 -99 SPO 1997 04 20 19 28 62 5.5 -9 684.20 -57.1 -55.2 -57.2 62 -99 SPO 1997 04 20 19 29 63 5.7 -9 684.20 -57.1 -55.2 -57.2 62 -99 SPO 1997 04 20 19 30 62 5.7 -9 684.20 -57.1 -55.3 -57.2 63 -99 SPO 1997 04 20 19 31 60 5.3 -9 684.20 -57.1 -55.3 -57.2 63 -99 SPO 1997 04 20 19 32 60 5.6 -9 684.20 -57.0 -55.4 -57.1 62 -99 SPO 1997 04 20 19 33 59 5.4 -9 684.20 -57.0 -55.4 -57.1 62 -99 SPO 1997 04 20 19 34 59 5.3 -9 684.20 -57.0 -55.4 -57.1 62 -99 SPO 1997 04 20 19 35 58 5.4 -9 684.20 -57.0 -55.4 -57.1 61 -99 SPO 1997 04 20 19 36 57 5.2 -9 684.30 -57.0 -55.4 -57.1 61 -99 SPO 1997 04 20 19 37 57 5.3 -9 684.20 -57.0 -55.3 -57.1 62 -99 SPO 1997 04 20 19 38 58 5.3 -9 684.20 -57.0 -55.3 -57.1 62 -99 SPO 1997 04 20 19 39 59 5.3 -9 684.30 -57.0 -55.3 -57.1 62 -99 SPO 1997 04 20 19 40 57 5.2 -9 684.20 -57.0 -55.3 -57.1 63 -99 SPO 1997 04 20 19 41 56 5.2 -9 684.20 -57.0 -55.4 -57.1 63 -99 SPO 1997 04 20 19 42 55 5.0 -9 684.20 -57.0 -55.3 -57.1 63 -99 SPO 1997 04 20 19 43 55 5.1 -9 684.20 -56.9 -55.3 -57.0 61 -99 SPO 1997 04 20 19 44 54 5.1 -9 684.20 -56.9 -55.3 -57.0 61 -99 SPO 1997 04 20 19 45 53 5.0 -9 684.20 -56.9 -55.3 -57.0 60 -99 SPO 1997 04 20 19 46 52 4.8 -9 684.30 -56.8 -55.4 -56.9 60 -99 SPO 1997 04 20 19 47 51 5.0 -9 684.20 -56.8 -55.4 -56.9 60 -99 SPO 1997 04 20 19 48 52 5.0 -9 684.20 -56.8 -55.3 -56.9 60 -99 SPO 1997 04 20 19 49 52 5.1 -9 684.20 -56.8 -55.3 -56.8 62 -99 SPO 1997 04 20 19 50 53 5.2 -9 684.20 -56.7 -55.3 -56.8 60 -99 SPO 1997 04 20 19 51 53 5.4 -9 684.20 -56.6 -55.2 -56.8 58 -99 SPO 1997 04 20 19 52 54 5.5 -9 684.20 -56.6 -55.2 -56.8 58 -99 SPO 1997 04 20 19 53 54 5.5 -9 684.20 -56.7 -55.2 -56.8 58 -99 SPO 1997 04 20 19 54 53 5.6 -9 684.20 -56.8 -55.1 -56.9 58 -99 SPO 1997 04 20 19 55 54 5.5 -9 684.20 -56.8 -55.0 -56.9 58 -99 SPO 1997 04 20 19 56 54 5.6 -9 684.20 -56.8 -54.9 -56.9 58 -99 SPO 1997 04 20 19 57 55 5.7 -9 684.20 -56.9 -54.9 -56.9 57 -99 SPO 1997 04 20 19 58 55 5.8 -9 684.20 -56.9 -54.9 -57.0 57 -99 SPO 1997 04 20 19 59 54 6.0 -9 684.20 -56.9 -54.9 -57.0 60 -99 SPO 1997 04 20 20 00 54 6.0 -9 684.20 -56.9 -54.8 -57.0 60 0 SPO 1997 04 20 20 01 55 5.9 -9 684.10 -57.0 -54.8 -57.0 62 -99 SPO 1997 04 20 20 02 54 5.9 -9 684.10 -57.0 -54.9 -57.0 62 -99 SPO 1997 04 20 20 03 54 5.9 -9 684.10 -57.1 -55.0 -57.1 64 -99 SPO 1997 04 20 20 04 53 5.8 -9 684.10 -57.0 -55.1 -57.1 63 -99 SPO 1997 04 20 20 05 52 5.9 -9 684.10 -57.0 -55.1 -57.2 63 -99 SPO 1997 04 20 20 06 52 5.8 -9 684.10 -57.0 -55.1 -57.1 63 -99 SPO 1997 04 20 20 07 52 5.8 -9 684.20 -57.1 -55.1 -57.2 63 -99 SPO 1997 04 20 20 08 54 5.8 -9 684.10 -57.1 -55.2 -57.2 62 -99 SPO 1997 04 20 20 09 55 5.7 -9 684.10 -57.1 -55.2 -57.2 62 -99 SPO 1997 04 20 20 10 56 5.6 -9 684.10 -57.2 -55.2 -57.2 63 -99 SPO 1997 04 20 20 11 57 5.7 -9 684.10 -57.2 -55.2 -57.2 63 -99 SPO 1997 04 20 20 12 58 5.7 -9 684.00 -57.2 -55.2 -57.3 63 -99 SPO 1997 04 20 20 13 59 5.8 -9 684.00 -57.2 -55.1 -57.3 63 -99 SPO 1997 04 20 20 14 60 5.7 -9 684.00 -57.2 -55.1 -57.3 63 -99 SPO 1997 04 20 20 15 61 5.8 -9 684.00 -57.3 -55.0 -57.4 63 -99 SPO 1997 04 20 20 16 60 5.7 -9 684.00 -57.3 -55.1 -57.4 63 -99 SPO 1997 04 20 20 17 61 5.6 -9 684.00 -57.3 -55.2 -57.4 63 -99 SPO 1997 04 20 20 18 62 5.7 -9 684.00 -57.4 -55.3 -57.4 63 -99 SPO 1997 04 20 20 19 63 5.5 -9 683.90 -57.4 -55.3 -57.5 63 -99 SPO 1997 04 20 20 20 63 5.5 -9 683.90 -57.4 -55.4 -57.5 63 -99 SPO 1997 04 20 20 21 63 5.5 -9 683.90 -57.4 -55.5 -57.5 61 -99 SPO 1997 04 20 20 22 63 5.3 -9 683.90 -57.4 -55.6 -57.4 61 -99 SPO 1997 04 20 20 23 63 5.4 -9 683.90 -57.4 -55.6 -57.5 61 -99 SPO 1997 04 20 20 24 64 5.4 -9 683.90 -57.4 -55.6 -57.4 63 -99 SPO 1997 04 20 20 25 66 5.2 -9 683.90 -57.4 -55.6 -57.4 63 -99 SPO 1997 04 20 20 26 67 5.0 -9 683.90 -57.4 -55.8 -57.5 63 -99 SPO 1997 04 20 20 27 66 5.0 -9 683.90 -57.5 -55.8 -57.5 63 -99 SPO 1997 04 20 20 28 68 5.0 -9 683.90 -57.5 -55.8 -57.6 63 -99 SPO 1997 04 20 20 29 69 5.0 -9 683.90 -57.6 -55.8 -57.6 64 -99 SPO 1997 04 20 20 30 70 5.0 -9 683.90 -57.6 -55.8 -57.7 63 -99 SPO 1997 04 20 20 31 69 5.0 -9 683.90 -57.7 -55.7 -57.7 63 -99 SPO 1997 04 20 20 32 69 4.9 -9 683.90 -57.8 -55.6 -57.8 63 -99 SPO 1997 04 20 20 33 68 5.0 -9 683.90 -57.7 -55.7 -57.8 61 -99 SPO 1997 04 20 20 34 68 5.1 -9 683.90 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 35 68 5.0 -9 683.80 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 36 67 5.2 -9 683.80 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 37 67 5.1 -9 683.80 -57.8 -55.9 -57.8 62 -99 SPO 1997 04 20 20 38 67 5.2 -9 683.80 -57.8 -55.8 -57.9 62 -99 SPO 1997 04 20 20 39 66 5.3 -9 683.80 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 40 66 5.4 -9 683.80 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 41 66 5.5 -9 683.80 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 20 20 42 66 5.4 -9 683.80 -57.7 -55.8 -57.8 61 -99 SPO 1997 04 20 20 43 64 5.5 -9 683.80 -57.7 -55.7 -57.8 61 -99 SPO 1997 04 20 20 44 63 5.5 -9 683.70 -57.6 -55.8 -57.7 60 -99 SPO 1997 04 20 20 45 63 5.5 -9 683.70 -57.6 -55.8 -57.7 60 -99 SPO 1997 04 20 20 46 63 5.6 -9 683.70 -57.6 -55.8 -57.7 60 -99 SPO 1997 04 20 20 47 63 5.5 -9 683.70 -57.6 -55.9 -57.7 60 -99 SPO 1997 04 20 20 48 63 5.4 -9 683.70 -57.5 -56.0 -57.6 61 -99 SPO 1997 04 20 20 49 64 5.1 -9 683.80 -57.5 -56.1 -57.7 61 -99 SPO 1997 04 20 20 50 64 5.2 -9 683.70 -57.6 -56.2 -57.7 62 -99 SPO 1997 04 20 20 51 63 5.1 -9 683.70 -57.6 -56.2 -57.6 -99 -99 SPO 1997 04 20 20 52 63 5.1 -9 683.70 -57.6 -56.4 -57.6 -99 -99 SPO 1997 04 20 20 53 64 5.1 -9 683.70 -57.6 -56.3 -57.6 -99 -99 SPO 1997 04 20 20 54 63 5.1 -9 683.70 -57.6 -56.3 -57.7 -99 -99 SPO 1997 04 20 20 55 63 4.8 -9 683.70 -57.6 -56.4 -57.7 -99 -99 SPO 1997 04 20 20 56 62 5.1 -9 683.70 -57.6 -56.4 -57.7 -99 -99 SPO 1997 04 20 20 57 62 5.2 -9 683.70 -57.6 -56.4 -57.6 -99 -99 SPO 1997 04 20 20 58 63 5.0 -9 683.70 -57.6 -56.3 -57.7 -99 -99 SPO 1997 04 20 20 59 64 5.0 -9 683.60 -57.6 -56.2 -57.7 -99 -99 SPO 1997 04 20 21 00 64 4.9 -9 683.60 -57.6 -56.2 -57.7 -99 0 SPO 1997 04 20 21 01 63 5.2 -9 683.60 -57.6 -56.1 -57.6 -99 -99 SPO 1997 04 20 21 02 63 5.3 -9 683.60 -57.5 -56.2 -57.6 -99 -99 SPO 1997 04 20 21 03 64 5.2 -9 683.60 -57.5 -56.2 -57.6 -99 -99 SPO 1997 04 20 21 04 65 5.5 -9 683.60 -57.5 -56.2 -57.6 -99 -99 SPO 1997 04 20 21 05 64 5.5 -9 683.60 -57.4 -56.1 -57.6 -99 -99 SPO 1997 04 20 21 06 65 5.6 -9 683.60 -57.4 -56.0 -57.5 -99 -99 SPO 1997 04 20 21 07 63 5.6 -9 683.50 -57.4 -56.1 -57.5 63 -99 SPO 1997 04 20 21 08 61 5.5 -9 683.50 -57.4 -56.2 -57.5 63 -99 SPO 1997 04 20 21 09 60 5.5 -9 683.50 -57.4 -56.3 -57.5 63 -99 SPO 1997 04 20 21 10 61 5.4 -9 683.50 -57.4 -56.3 -57.5 63 -99 SPO 1997 04 20 21 11 61 5.5 -9 683.50 -57.5 -56.2 -57.5 62 -99 SPO 1997 04 20 21 12 60 5.4 -9 683.50 -57.5 -56.3 -57.6 62 -99 SPO 1997 04 20 21 13 60 5.2 -9 683.50 -57.5 -56.3 -57.6 62 -99 SPO 1997 04 20 21 14 60 5.3 -9 683.50 -57.5 -56.3 -57.6 62 -99 SPO 1997 04 20 21 15 61 5.2 -9 683.50 -57.4 -56.2 -57.5 63 -99 SPO 1997 04 20 21 16 62 5.3 -9 683.50 -57.5 -56.1 -57.6 63 -99 SPO 1997 04 20 21 17 62 5.3 -9 683.50 -57.5 -56.1 -57.6 63 -99 SPO 1997 04 20 21 18 61 5.2 -9 683.50 -57.5 -56.1 -57.6 63 -99 SPO 1997 04 20 21 19 61 5.2 -9 683.50 -57.5 -56.0 -57.6 63 -99 SPO 1997 04 20 21 20 61 5.3 -9 683.50 -57.5 -55.9 -57.6 63 -99 SPO 1997 04 20 21 21 61 5.3 -9 683.50 -57.5 -55.9 -57.6 62 -99 SPO 1997 04 20 21 22 61 5.2 -9 683.60 -57.5 -56.0 -57.6 61 -99 SPO 1997 04 20 21 23 61 5.1 -9 683.60 -57.5 -56.0 -57.6 61 -99 SPO 1997 04 20 21 24 60 5.1 -9 683.50 -57.5 -56.1 -57.6 61 -99 SPO 1997 04 20 21 25 60 5.1 -9 683.60 -57.6 -56.1 -57.6 62 -99 SPO 1997 04 20 21 26 60 5.0 -9 683.60 -57.6 -56.1 -57.6 63 -99 SPO 1997 04 20 21 27 59 4.9 -9 683.60 -57.6 -56.1 -57.7 63 -99 SPO 1997 04 20 21 28 58 4.5 -9 683.60 -57.6 -56.3 -57.7 64 -99 SPO 1997 04 20 21 29 59 4.5 -9 683.60 -57.7 -56.4 -57.7 65 -99 SPO 1997 04 20 21 30 60 4.5 -9 683.60 -57.7 -56.5 -57.7 65 -99 SPO 1997 04 20 21 31 61 4.4 -9 683.60 -57.7 -56.5 -57.8 65 -99 SPO 1997 04 20 21 32 60 4.3 -9 683.60 -57.8 -56.6 -57.8 64 -99 SPO 1997 04 20 21 33 62 4.2 -9 683.60 -57.8 -56.6 -57.9 63 -99 SPO 1997 04 20 21 34 64 4.3 -9 683.60 -57.8 -56.6 -57.9 62 -99 SPO 1997 04 20 21 35 64 4.2 -9 683.60 -57.9 -56.6 -57.9 62 -99 SPO 1997 04 20 21 36 66 4.2 -9 683.60 -57.9 -56.6 -57.9 61 -99 SPO 1997 04 20 21 37 66 4.2 -9 683.60 -57.9 -56.7 -58.0 61 -99 SPO 1997 04 20 21 38 66 4.3 -9 683.60 -57.9 -56.7 -58.0 61 -99 SPO 1997 04 20 21 39 64 4.3 -9 683.60 -58.0 -56.7 -58.0 63 -99 SPO 1997 04 20 21 40 64 4.3 -9 683.60 -57.9 -56.5 -58.0 62 -99 SPO 1997 04 20 21 41 67 4.6 -9 683.60 -58.0 -56.2 -58.0 63 -99 SPO 1997 04 20 21 42 65 4.4 -9 683.60 -57.9 -56.2 -58.0 62 -99 SPO 1997 04 20 21 43 64 4.5 -9 683.60 -57.9 -56.3 -58.0 62 -99 SPO 1997 04 20 21 44 61 4.2 -9 683.60 -57.9 -56.4 -57.9 61 -99 SPO 1997 04 20 21 45 61 4.3 -9 683.60 -57.9 -56.3 -57.9 61 -99 SPO 1997 04 20 21 46 61 4.4 -9 683.60 -57.8 -56.0 -57.9 60 -99 SPO 1997 04 20 21 47 61 4.4 -9 683.60 -57.7 -56.0 -57.8 59 -99 SPO 1997 04 20 21 48 59 4.5 -9 683.60 -57.7 -56.0 -57.8 61 -99 SPO 1997 04 20 21 49 59 4.3 -9 683.60 -57.6 -55.8 -57.7 60 -99 SPO 1997 04 20 21 50 58 4.2 -9 683.60 -57.5 -55.9 -57.6 61 -99 SPO 1997 04 20 21 51 59 4.2 -9 683.60 -57.4 -55.8 -57.6 61 -99 SPO 1997 04 20 21 52 59 4.3 -9 683.60 -57.4 -55.8 -57.6 61 -99 SPO 1997 04 20 21 53 58 4.4 -9 683.60 -57.3 -55.7 -57.5 60 -99 SPO 1997 04 20 21 54 57 4.6 -9 683.60 -57.2 -55.6 -57.4 60 -99 SPO 1997 04 20 21 55 55 4.7 -9 683.60 -57.2 -55.6 -57.3 61 -99 SPO 1997 04 20 21 56 54 4.8 -9 683.60 -57.0 -55.6 -57.2 60 -99 SPO 1997 04 20 21 57 53 4.9 -9 683.50 -56.9 -55.6 -57.0 60 -99 SPO 1997 04 20 21 58 53 5.4 -9 683.50 -56.8 -55.4 -57.0 60 -99 SPO 1997 04 20 21 59 52 5.7 -9 683.50 -56.6 -55.3 -56.8 59 -99 SPO 1997 04 20 22 00 54 5.7 -9 683.50 -56.5 -55.2 -56.7 60 0 SPO 1997 04 20 22 01 52 5.7 -9 683.50 -56.4 -55.0 -56.6 61 -99 SPO 1997 04 20 22 02 49 5.6 -9 683.50 -56.2 -55.1 -56.5 61 -99 SPO 1997 04 20 22 03 52 5.3 -9 683.50 -56.1 -55.1 -56.4 61 -99 SPO 1997 04 20 22 04 51 5.5 -9 683.50 -56.0 -55.0 -56.2 61 -99 SPO 1997 04 20 22 05 50 5.6 -9 683.50 -55.8 -55.0 -56.1 60 -99 SPO 1997 04 20 22 06 50 5.9 -9 683.40 -55.7 -54.9 -56.0 60 -99 SPO 1997 04 20 22 07 49 5.9 -9 683.40 -55.6 -54.8 -55.8 61 -99 SPO 1997 04 20 22 08 49 6.5 -9 683.40 -55.6 -54.8 -55.8 61 -99 SPO 1997 04 20 22 09 48 6.5 -9 683.40 -55.5 -54.7 -55.8 60 -99 SPO 1997 04 20 22 10 48 6.6 -9 683.40 -55.5 -54.7 -55.8 60 -99 SPO 1997 04 20 22 11 48 6.6 -9 683.30 -55.6 -54.8 -55.7 62 -99 SPO 1997 04 20 22 12 48 6.9 -9 683.40 -55.5 -54.7 -55.6 62 -99 SPO 1997 04 20 22 13 47 6.9 -9 683.30 -55.5 -54.7 -55.6 62 -99 SPO 1997 04 20 22 14 47 6.8 -9 683.30 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 15 46 6.8 -9 683.30 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 16 47 6.7 -9 683.30 -55.6 -54.7 -55.6 65 -99 SPO 1997 04 20 22 17 48 6.8 -9 683.20 -55.5 -54.6 -55.6 64 -99 SPO 1997 04 20 22 18 50 6.8 -9 683.20 -55.5 -54.6 -55.6 62 -99 SPO 1997 04 20 22 19 50 6.8 -9 683.20 -55.5 -54.6 -55.6 62 -99 SPO 1997 04 20 22 20 50 6.6 -9 683.20 -55.5 -54.6 -55.6 62 -99 SPO 1997 04 20 22 21 50 6.6 -9 683.20 -55.5 -54.6 -55.6 62 -99 SPO 1997 04 20 22 22 50 6.7 -9 683.20 -55.4 -54.6 -55.6 61 -99 SPO 1997 04 20 22 23 50 6.6 -9 683.20 -55.4 -54.6 -55.5 62 -99 SPO 1997 04 20 22 24 51 6.5 -9 683.20 -55.4 -54.6 -55.5 63 -99 SPO 1997 04 20 22 25 51 6.5 -9 683.20 -55.4 -54.6 -55.5 63 -99 SPO 1997 04 20 22 26 51 6.4 -9 683.20 -55.4 -54.6 -55.5 63 -99 SPO 1997 04 20 22 27 49 6.0 -9 683.20 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 28 49 6.3 -9 683.20 -55.5 -54.8 -55.5 64 -99 SPO 1997 04 20 22 29 52 6.2 -9 683.20 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 30 54 6.1 -9 683.20 -55.5 -54.7 -55.6 64 -99 SPO 1997 04 20 22 31 53 6.0 -9 683.20 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 32 54 6.1 -9 683.20 -55.5 -54.8 -55.5 62 -99 SPO 1997 04 20 22 33 54 5.8 -9 683.20 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 34 54 5.7 -9 683.20 -55.5 -54.8 -55.6 64 -99 SPO 1997 04 20 22 35 55 5.4 -9 683.30 -55.5 -54.9 -55.6 64 -99 SPO 1997 04 20 22 36 55 5.7 -9 683.30 -55.6 -54.9 -55.6 65 -99 SPO 1997 04 20 22 37 55 5.4 -9 683.30 -55.6 -54.9 -55.6 65 -99 SPO 1997 04 20 22 38 55 5.0 -9 683.30 -55.5 -55.0 -55.7 64 -99 SPO 1997 04 20 22 39 55 4.8 -9 683.30 -55.6 -55.0 -55.7 65 -99 SPO 1997 04 20 22 40 56 4.8 -9 683.30 -55.7 -55.0 -55.8 64 -99 SPO 1997 04 20 22 41 55 4.8 -9 683.30 -55.7 -55.0 -55.8 63 -99 SPO 1997 04 20 22 42 54 4.8 -9 683.30 -55.7 -55.1 -55.8 63 -99 SPO 1997 04 20 22 43 53 4.8 -9 683.30 -55.7 -55.1 -55.8 63 -99 SPO 1997 04 20 22 44 52 4.7 -9 683.30 -55.8 -55.2 -55.8 64 -99 SPO 1997 04 20 22 45 52 4.6 -9 683.30 -55.7 -55.1 -55.8 63 -99 SPO 1997 04 20 22 46 52 4.5 -9 683.30 -55.7 -55.1 -55.7 63 -99 SPO 1997 04 20 22 47 53 4.8 -9 683.30 -55.6 -55.0 -55.7 62 -99 SPO 1997 04 20 22 48 54 4.8 -9 683.30 -55.6 -55.0 -55.7 63 -99 SPO 1997 04 20 22 49 54 4.8 -9 683.30 -55.6 -55.0 -55.6 63 -99 SPO 1997 04 20 22 50 53 4.8 -9 683.30 -55.6 -54.9 -55.6 63 -99 SPO 1997 04 20 22 51 54 4.8 -9 683.30 -55.5 -54.9 -55.6 62 -99 SPO 1997 04 20 22 52 53 4.6 -9 683.30 -55.5 -54.9 -55.6 62 -99 SPO 1997 04 20 22 53 54 4.5 -9 683.30 -55.6 -54.8 -55.6 63 -99 SPO 1997 04 20 22 54 52 4.8 -9 683.30 -55.5 -54.8 -55.6 62 -99 SPO 1997 04 20 22 55 53 4.8 -9 683.40 -55.4 -54.7 -55.5 62 -99 SPO 1997 04 20 22 56 51 4.5 -9 683.30 -55.3 -54.7 -55.4 62 -99 SPO 1997 04 20 22 57 51 4.5 -9 683.40 -55.3 -54.7 -55.4 62 -99 SPO 1997 04 20 22 58 50 4.5 -9 683.40 -55.2 -54.7 -55.4 63 -99 SPO 1997 04 20 22 59 48 4.6 -9 683.40 -55.2 -54.7 -55.3 63 -99 SPO 1997 04 20 23 00 51 5.0 -9 683.40 -55.2 -54.6 -55.3 64 0 SPO 1997 04 20 23 01 52 4.7 -9 683.30 -55.1 -54.5 -55.2 63 -99 SPO 1997 04 20 23 02 50 4.6 -9 683.40 -55.1 -54.6 -55.2 63 -99 SPO 1997 04 20 23 03 50 4.7 -9 683.40 -55.0 -54.6 -55.2 62 -99 SPO 1997 04 20 23 04 48 4.8 -9 683.40 -55.1 -54.6 -55.2 63 -99 SPO 1997 04 20 23 05 46 4.7 -9 683.40 -55.1 -54.6 -55.2 62 -99 SPO 1997 04 20 23 06 47 4.9 -9 683.40 -55.0 -54.6 -55.1 62 -99 SPO 1997 04 20 23 07 44 5.0 -9 683.40 -55.0 -54.5 -55.1 62 -99 SPO 1997 04 20 23 08 43 5.0 -9 683.40 -54.9 -54.4 -55.1 62 -99 SPO 1997 04 20 23 09 40 5.3 -9 683.40 -54.9 -54.4 -55.0 63 -99 SPO 1997 04 20 23 10 40 6.0 -9 683.40 -54.8 -54.2 -55.0 62 -99 SPO 1997 04 20 23 11 40 5.5 -9 683.40 -54.8 -54.2 -54.9 64 -99 SPO 1997 04 20 23 12 43 5.5 -9 683.40 -54.9 -54.2 -55.0 65 -99 SPO 1997 04 20 23 13 45 5.5 -9 683.40 -54.9 -54.3 -55.0 65 -99 SPO 1997 04 20 23 14 46 5.7 -9 683.40 -54.8 -54.2 -55.0 62 -99 SPO 1997 04 20 23 15 46 5.9 -9 683.40 -54.8 -54.2 -54.9 62 -99 SPO 1997 04 20 23 16 47 5.5 -9 683.30 -54.9 -54.2 -54.9 63 -99 SPO 1997 04 20 23 17 46 5.7 -9 683.30 -54.9 -54.4 -55.0 63 -99 SPO 1997 04 20 23 18 45 6.0 -9 683.30 -54.9 -54.4 -55.0 63 -99 SPO 1997 04 20 23 19 45 6.0 -9 683.30 -54.9 -54.4 -55.0 65 -99 SPO 1997 04 20 23 20 45 6.0 -9 683.30 -55.0 -54.4 -55.0 66 -99 SPO 1997 04 20 23 21 47 6.1 -9 683.30 -55.0 -54.4 -55.0 66 -99 SPO 1997 04 20 23 22 47 6.3 -9 683.20 -55.0 -54.4 -55.0 66 -99 SPO 1997 04 20 23 23 47 5.8 -9 683.20 -55.0 -54.5 -55.0 64 -99 SPO 1997 04 20 23 24 48 5.8 -9 683.20 -55.2 -54.6 -55.2 66 -99 SPO 1997 04 20 23 25 45 5.9 -9 683.20 -55.2 -54.6 -55.2 66 -99 SPO 1997 04 20 23 26 47 5.9 -9 683.20 -55.2 -54.6 -55.3 64 -99 SPO 1997 04 20 23 27 45 6.4 -9 683.20 -55.2 -54.5 -55.2 64 -99 SPO 1997 04 20 23 28 46 6.2 -9 683.20 -55.1 -54.5 -55.1 62 -99 SPO 1997 04 20 23 29 48 6.3 -9 683.20 -55.1 -54.5 -55.1 62 -99 SPO 1997 04 20 23 30 47 6.3 -9 683.20 -55.0 -54.6 -55.1 62 -99 SPO 1997 04 20 23 31 47 6.0 -9 683.20 -55.1 -54.6 -55.1 65 -99 SPO 1997 04 20 23 32 48 6.3 -9 683.20 -55.1 -54.6 -55.2 65 -99 SPO 1997 04 20 23 33 46 6.3 -9 683.20 -55.1 -54.7 -55.2 65 -99 SPO 1997 04 20 23 34 46 6.3 -9 683.20 -55.1 -54.7 -55.2 65 -99 SPO 1997 04 20 23 35 46 6.5 -9 683.20 -55.1 -54.8 -55.2 65 -99 SPO 1997 04 20 23 36 44 6.2 -9 683.20 -55.1 -54.8 -55.2 65 -99 SPO 1997 04 20 23 37 44 6.3 -9 683.20 -55.1 -54.8 -55.2 65 -99 SPO 1997 04 20 23 38 44 6.1 -9 683.20 -55.1 -54.8 -55.2 65 -99 SPO 1997 04 20 23 39 44 6.1 -9 683.20 -55.2 -54.8 -55.2 64 -99 SPO 1997 04 20 23 40 45 6.1 -9 683.20 -55.2 -54.8 -55.2 63 -99 SPO 1997 04 20 23 41 45 6.2 -9 683.20 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 20 23 42 43 6.2 -9 683.20 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 20 23 43 43 5.9 -9 683.20 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 20 23 44 42 6.3 -9 683.20 -55.1 -54.7 -55.2 65 -99 SPO 1997 04 20 23 45 42 6.6 -9 683.10 -55.0 -54.6 -55.1 64 -99 SPO 1997 04 20 23 46 41 6.7 -9 683.10 -55.0 -54.6 -55.1 64 -99 SPO 1997 04 20 23 47 40 6.8 -9 683.10 -54.9 -54.5 -55.0 65 -99 SPO 1997 04 20 23 48 39 6.7 -9 683.10 -54.9 -54.5 -55.0 65 -99 SPO 1997 04 20 23 49 39 6.4 -9 683.10 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 20 23 50 41 7.0 -9 683.00 -55.0 -54.5 -55.0 64 -99 SPO 1997 04 20 23 51 41 6.7 -9 683.00 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 20 23 52 39 7.1 -9 683.00 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 20 23 53 39 7.1 -9 683.00 -54.9 -54.5 -55.0 63 -99 SPO 1997 04 20 23 54 38 7.3 -9 683.00 -54.8 -54.5 -54.9 62 -99 SPO 1997 04 20 23 55 38 7.4 -9 683.00 -54.8 -54.4 -54.9 62 -99 SPO 1997 04 20 23 56 38 7.4 -9 683.00 -54.8 -54.4 -54.9 64 -99 SPO 1997 04 20 23 57 37 7.0 -9 683.00 -54.8 -54.4 -54.9 64 -99 SPO 1997 04 20 23 58 37 7.1 -9 683.00 -54.8 -54.4 -54.9 -99 -99 SPO 1997 04 20 23 59 38 7.2 -9 683.00 -54.8 -54.4 -54.8 -99 -99 SPO 1997 04 21 00 00 38 7.2 -9 683.00 -54.7 -54.4 -54.8 -99 0 SPO 1997 04 21 00 01 39 7.3 -9 683.00 -54.7 -54.3 -54.8 -99 -99 SPO 1997 04 21 00 02 39 7.1 -9 683.00 -54.6 -54.3 -54.7 -99 -99 SPO 1997 04 21 00 03 39 7.0 -9 683.00 -54.7 -54.3 -54.7 -99 -99 SPO 1997 04 21 00 04 38 7.3 -9 683.00 -54.6 -54.2 -54.7 -99 -99 SPO 1997 04 21 00 05 37 7.3 -9 683.00 -54.6 -54.2 -54.6 -99 -99 SPO 1997 04 21 00 06 39 7.3 -9 683.00 -54.6 -54.2 -54.7 -99 -99 SPO 1997 04 21 00 07 38 7.0 -9 683.00 -54.6 -54.3 -54.7 -99 -99 SPO 1997 04 21 00 08 39 6.6 -9 683.00 -54.6 -54.4 -54.7 -99 -99 SPO 1997 04 21 00 09 39 6.8 -9 683.00 -54.7 -54.4 -54.8 -99 -99 SPO 1997 04 21 00 10 39 7.0 -9 683.00 -54.7 -54.4 -54.8 -99 -99 SPO 1997 04 21 00 11 39 6.9 -9 683.00 -54.6 -54.4 -54.7 -99 -99 SPO 1997 04 21 00 12 40 6.7 -9 683.00 -54.7 -54.4 -54.7 -99 -99 SPO 1997 04 21 00 13 39 7.0 -9 683.00 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 21 00 14 41 7.0 -9 683.00 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 21 00 15 40 6.9 -9 682.90 -54.7 -54.4 -54.7 63 -99 SPO 1997 04 21 00 16 41 7.0 -9 682.90 -54.7 -54.4 -54.8 64 -99 SPO 1997 04 21 00 17 42 7.0 -9 682.90 -54.7 -54.4 -54.7 64 -99 SPO 1997 04 21 00 18 42 6.9 -9 682.90 -54.7 -54.5 -54.8 64 -99 SPO 1997 04 21 00 19 42 6.8 -9 682.90 -54.8 -54.5 -54.8 66 -99 SPO 1997 04 21 00 20 41 6.8 -9 682.90 -54.8 -54.5 -54.8 66 -99 SPO 1997 04 21 00 21 42 6.7 -9 682.90 -54.8 -54.5 -54.8 66 -99 SPO 1997 04 21 00 22 43 6.8 -9 682.80 -54.8 -54.5 -54.8 65 -99 SPO 1997 04 21 00 23 42 6.8 -9 682.80 -54.8 -54.6 -54.9 64 -99 SPO 1997 04 21 00 24 42 6.6 -9 682.80 -54.8 -54.6 -54.9 64 -99 SPO 1997 04 21 00 25 42 6.8 -9 682.80 -54.9 -54.6 -54.9 64 -99 SPO 1997 04 21 00 26 43 6.9 -9 682.80 -54.8 -54.6 -54.9 63 -99 SPO 1997 04 21 00 27 42 6.8 -9 682.80 -54.8 -54.6 -54.9 63 -99 SPO 1997 04 21 00 28 42 7.2 -9 682.70 -54.8 -54.6 -54.9 64 -99 SPO 1997 04 21 00 29 40 7.7 -9 682.70 -54.8 -54.5 -54.8 64 -99 SPO 1997 04 21 00 30 41 7.4 -9 682.70 -54.8 -54.5 -54.9 65 -99 SPO 1997 04 21 00 31 41 7.1 -9 682.70 -54.9 -54.5 -54.9 66 -99 SPO 1997 04 21 00 32 41 7.1 -9 682.70 -54.9 -54.5 -54.9 65 -99 SPO 1997 04 21 00 33 41 7.2 -9 682.70 -54.9 -54.5 -54.9 65 -99 SPO 1997 04 21 00 34 41 7.1 -9 682.70 -54.9 -54.5 -55.0 64 -99 SPO 1997 04 21 00 35 42 6.9 -9 682.70 -55.0 -54.6 -55.0 65 -99 SPO 1997 04 21 00 36 41 7.4 -9 682.70 -55.0 -54.5 -55.0 64 -99 SPO 1997 04 21 00 37 41 7.3 -9 682.70 -55.0 -54.5 -55.0 64 -99 SPO 1997 04 21 00 38 40 7.4 -9 682.70 -54.9 -54.5 -55.0 62 -99 SPO 1997 04 21 00 39 41 7.3 -9 682.70 -55.0 -54.5 -55.0 63 -99 SPO 1997 04 21 00 40 39 7.1 -9 682.70 -55.0 -54.6 -55.0 63 -99 SPO 1997 04 21 00 41 39 7.3 -9 682.70 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 21 00 42 39 7.1 -9 682.70 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 21 00 43 39 7.1 -9 682.70 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 21 00 44 38 7.2 -9 682.70 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 21 00 45 38 7.4 -9 682.70 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 21 00 46 38 7.2 -9 682.70 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 21 00 47 39 7.2 -9 682.70 -55.0 -54.6 -55.0 63 -99 SPO 1997 04 21 00 48 38 7.5 -9 682.70 -55.0 -54.6 -55.0 62 -99 SPO 1997 04 21 00 49 36 7.6 -9 682.60 -55.0 -54.5 -55.1 62 -99 SPO 1997 04 21 00 50 37 7.6 -9 682.60 -55.0 -54.5 -55.0 62 -99 SPO 1997 04 21 00 51 37 7.8 -9 682.60 -55.0 -54.4 -55.0 64 -99 SPO 1997 04 21 00 52 37 7.9 -9 682.60 -54.9 -54.4 -55.0 63 -99 SPO 1997 04 21 00 53 37 7.7 -9 682.60 -54.9 -54.4 -54.9 64 -99 SPO 1997 04 21 00 54 37 7.6 -9 682.60 -54.8 -54.4 -54.9 63 -99 SPO 1997 04 21 00 55 37 7.7 -9 682.60 -54.8 -54.4 -54.9 63 -99 SPO 1997 04 21 00 56 36 7.7 -9 682.60 -54.9 -54.4 -54.9 64 -99 SPO 1997 04 21 00 57 36 7.5 -9 682.60 -54.8 -54.5 -54.9 63 -99 SPO 1997 04 21 00 58 37 7.9 -9 682.60 -54.8 -54.5 -54.8 63 -99 SPO 1997 04 21 00 59 36 7.6 -9 682.60 -54.8 -54.5 -54.9 64 -99 SPO 1997 04 21 01 00 36 7.6 -9 682.60 -54.8 -54.5 -54.8 64 0 SPO 1997 04 21 01 01 37 7.9 -9 682.60 -54.8 -54.5 -54.8 64 -99 SPO 1997 04 21 01 02 35 8.1 -9 682.60 -54.7 -54.4 -54.8 64 -99 SPO 1997 04 21 01 03 35 8.3 -9 682.60 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 21 01 04 34 8.4 -9 682.60 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 21 01 05 34 8.4 -9 682.60 -54.6 -54.4 -54.7 65 -99 SPO 1997 04 21 01 06 35 8.6 -9 682.50 -54.6 -54.3 -54.6 66 -99 SPO 1997 04 21 01 07 35 8.2 -9 682.50 -54.6 -54.3 -54.6 66 -99 SPO 1997 04 21 01 08 35 8.0 -9 682.50 -54.5 -54.3 -54.6 64 -99 SPO 1997 04 21 01 09 34 8.3 -9 682.50 -54.5 -54.3 -54.6 63 -99 SPO 1997 04 21 01 10 35 8.5 -9 682.50 -54.4 -54.2 -54.5 63 -99 SPO 1997 04 21 01 11 35 7.7 -9 682.50 -54.5 -54.2 -54.5 63 -99 SPO 1997 04 21 01 12 35 8.4 -9 682.50 -54.5 -54.2 -54.6 63 -99 SPO 1997 04 21 01 13 35 8.5 -9 682.50 -54.4 -54.2 -54.5 63 -99 SPO 1997 04 21 01 14 33 8.5 -9 682.50 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 21 01 15 32 8.2 -9 682.50 -54.4 -54.3 -54.4 66 -99 SPO 1997 04 21 01 16 33 8.7 -9 682.50 -54.4 -54.3 -54.4 67 -99 SPO 1997 04 21 01 17 33 9.1 -9 682.50 -54.3 -54.2 -54.4 66 -99 SPO 1997 04 21 01 18 33 8.2 -9 682.50 -54.3 -54.2 -54.4 66 -99 SPO 1997 04 21 01 19 32 8.4 -9 682.50 -54.4 -54.3 -54.5 67 -99 SPO 1997 04 21 01 20 33 8.5 -9 682.50 -54.4 -54.2 -54.5 66 -99 SPO 1997 04 21 01 21 34 8.6 -9 682.40 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 21 01 22 34 8.7 -9 682.40 -54.4 -54.1 -54.4 64 -99 SPO 1997 04 21 01 23 36 8.6 -9 682.40 -54.4 -54.2 -54.4 64 -99 SPO 1997 04 21 01 24 37 8.0 -9 682.40 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 21 01 25 38 8.0 -9 682.40 -54.5 -54.2 -54.6 65 -99 SPO 1997 04 21 01 26 37 8.6 -9 682.40 -54.5 -54.2 -54.5 65 -99 SPO 1997 04 21 01 27 38 7.9 -9 682.40 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 21 01 28 36 7.7 -9 682.40 -54.5 -54.2 -54.6 65 -99 SPO 1997 04 21 01 29 37 8.3 -9 682.40 -54.5 -54.2 -54.5 65 -99 SPO 1997 04 21 01 30 37 8.0 -9 682.40 -54.5 -54.4 -54.6 65 -99 SPO 1997 04 21 01 31 39 7.9 -9 682.40 -54.6 -54.4 -54.6 65 -99 SPO 1997 04 21 01 32 39 8.0 -9 682.30 -54.6 -54.4 -54.6 64 -99 SPO 1997 04 21 01 33 37 8.3 -9 682.30 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 21 01 34 39 8.0 -9 682.30 -54.7 -54.4 -54.7 65 -99 SPO 1997 04 21 01 35 39 8.2 -9 682.30 -54.7 -54.4 -54.8 65 -99 SPO 1997 04 21 01 36 39 7.9 -9 682.30 -54.8 -54.4 -54.8 66 -99 SPO 1997 04 21 01 37 38 8.1 -9 682.30 -54.8 -54.4 -54.8 66 -99 SPO 1997 04 21 01 38 40 8.0 -9 682.30 -54.7 -54.4 -54.8 65 -99 SPO 1997 04 21 01 39 39 8.1 -9 682.30 -54.7 -54.3 -54.8 65 -99 SPO 1997 04 21 01 40 40 8.2 -9 682.30 -54.7 -54.4 -54.8 65 -99 SPO 1997 04 21 01 41 38 8.0 -9 682.30 -54.7 -54.4 -54.7 65 -99 SPO 1997 04 21 01 42 39 7.9 -9 682.30 -54.7 -54.4 -54.7 64 -99 SPO 1997 04 21 01 43 38 8.0 -9 682.30 -54.7 -54.4 -54.7 64 -99 SPO 1997 04 21 01 44 39 8.2 -9 682.30 -54.7 -54.4 -54.7 64 -99 SPO 1997 04 21 01 45 38 8.4 -9 682.20 -54.6 -54.3 -54.7 63 -99 SPO 1997 04 21 01 46 38 8.3 -9 682.30 -54.6 -54.4 -54.7 63 -99 SPO 1997 04 21 01 47 37 8.2 -9 682.30 -54.6 -54.4 -54.7 64 -99 SPO 1997 04 21 01 48 35 8.1 -9 682.30 -54.7 -54.4 -54.8 66 -99 SPO 1997 04 21 01 49 35 8.0 -9 682.30 -54.7 -54.5 -54.7 66 -99 SPO 1997 04 21 01 50 36 8.2 -9 682.30 -54.8 -54.5 -54.8 66 -99 SPO 1997 04 21 01 51 36 7.9 -9 682.30 -54.8 -54.5 -54.8 66 -99 SPO 1997 04 21 01 52 38 7.8 -9 682.30 -54.8 -54.5 -54.9 66 -99 SPO 1997 04 21 01 53 36 7.6 -9 682.30 -54.8 -54.6 -54.9 65 -99 SPO 1997 04 21 01 54 37 7.5 -9 682.30 -54.9 -54.6 -54.9 65 -99 SPO 1997 04 21 01 55 38 7.6 -9 682.30 -54.9 -54.6 -55.0 65 -99 SPO 1997 04 21 01 56 37 7.6 -9 682.30 -55.0 -54.6 -55.0 65 -99 SPO 1997 04 21 01 57 36 7.4 -9 682.30 -55.0 -54.6 -55.0 65 -99 SPO 1997 04 21 01 58 37 7.4 -9 682.30 -55.0 -54.7 -55.0 65 -99 SPO 1997 04 21 01 59 37 7.5 -9 682.30 -55.0 -54.6 -55.0 65 -99 SPO 1997 04 21 02 00 38 7.6 -9 682.30 -55.0 -54.6 -55.0 65 0 SPO 1997 04 21 02 01 38 7.5 -9 682.30 -55.0 -54.6 -55.1 64 -99 SPO 1997 04 21 02 02 38 7.8 -9 682.30 -55.0 -54.6 -55.0 64 -99 SPO 1997 04 21 02 03 36 7.8 -9 682.30 -55.0 -54.6 -55.0 65 -99 SPO 1997 04 21 02 04 35 7.2 -9 682.30 -55.0 -54.7 -55.0 64 -99 SPO 1997 04 21 02 05 35 7.8 -9 682.30 -55.1 -54.7 -55.1 65 -99 SPO 1997 04 21 02 06 34 7.2 -9 682.30 -55.1 -54.7 -55.1 64 -99 SPO 1997 04 21 02 07 34 7.5 -9 682.20 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 21 02 08 34 7.3 -9 682.30 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 02 09 35 7.7 -9 682.30 -55.1 -54.7 -55.2 64 -99 SPO 1997 04 21 02 10 36 7.6 -9 682.20 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 21 02 11 35 7.8 -9 682.20 -55.0 -54.6 -55.1 63 -99 SPO 1997 04 21 02 12 35 7.6 -9 682.20 -55.0 -54.6 -55.1 64 -99 SPO 1997 04 21 02 13 35 7.4 -9 682.20 -55.1 -54.6 -55.2 64 -99 SPO 1997 04 21 02 14 35 7.6 -9 682.20 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 21 02 15 35 7.6 -9 682.20 -55.1 -54.6 -55.1 64 -99 SPO 1997 04 21 02 16 35 7.2 -9 682.20 -55.0 -54.6 -55.1 63 -99 SPO 1997 04 21 02 17 35 7.5 -9 682.20 -55.0 -54.5 -55.1 62 -99 SPO 1997 04 21 02 18 37 7.8 -9 682.20 -55.0 -54.5 -55.0 62 -99 SPO 1997 04 21 02 19 35 7.6 -9 682.20 -55.0 -54.6 -55.0 62 -99 SPO 1997 04 21 02 20 34 7.3 -9 682.20 -55.1 -54.6 -55.1 63 -99 SPO 1997 04 21 02 21 34 7.2 -9 682.20 -55.1 -54.7 -55.1 64 -99 SPO 1997 04 21 02 22 34 7.2 -9 682.20 -55.1 -54.7 -55.1 64 -99 SPO 1997 04 21 02 23 36 6.9 -9 682.20 -55.1 -54.7 -55.2 64 -99 SPO 1997 04 21 02 24 35 6.9 -9 682.20 -55.2 -54.7 -55.2 65 -99 SPO 1997 04 21 02 25 36 6.6 -9 682.20 -55.2 -54.8 -55.2 65 -99 SPO 1997 04 21 02 26 35 6.8 -9 682.20 -55.2 -54.8 -55.2 65 -99 SPO 1997 04 21 02 27 36 6.8 -9 682.20 -55.2 -54.7 -55.2 64 -99 SPO 1997 04 21 02 28 36 6.7 -9 682.20 -55.2 -54.7 -55.2 63 -99 SPO 1997 04 21 02 29 37 6.5 -9 682.20 -55.1 -54.7 -55.2 62 -99 SPO 1997 04 21 02 30 37 6.9 -9 682.20 -55.2 -54.7 -55.2 63 -99 SPO 1997 04 21 02 31 37 6.4 -9 682.20 -55.1 -54.7 -55.2 62 -99 SPO 1997 04 21 02 32 36 6.0 -9 682.10 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 21 02 33 37 6.2 -9 682.10 -55.0 -54.7 -55.1 63 -99 SPO 1997 04 21 02 34 37 6.5 -9 682.10 -55.0 -54.7 -55.1 63 -99 SPO 1997 04 21 02 35 37 6.7 -9 682.10 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 21 02 36 37 6.3 -9 682.10 -55.1 -54.8 -55.1 65 -99 SPO 1997 04 21 02 37 35 6.0 -9 682.20 -55.1 -54.8 -55.1 65 -99 SPO 1997 04 21 02 38 35 6.3 -9 682.20 -55.0 -54.8 -55.1 63 -99 SPO 1997 04 21 02 39 36 6.1 -9 682.20 -55.0 -54.8 -55.1 62 -99 SPO 1997 04 21 02 40 35 6.3 -9 682.20 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 41 35 6.2 -9 682.20 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 42 34 6.2 -9 682.20 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 43 34 6.4 -9 682.20 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 44 34 6.0 -9 682.10 -55.1 -54.7 -55.1 62 -99 SPO 1997 04 21 02 45 34 6.1 -9 682.10 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 21 02 46 34 6.4 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 02 47 35 6.5 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 02 48 36 6.0 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 02 49 37 6.1 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 02 50 36 6.3 -9 682.10 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 51 37 6.6 -9 682.10 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 52 36 6.1 -9 682.10 -55.1 -54.7 -55.1 62 -99 SPO 1997 04 21 02 53 35 6.2 -9 682.10 -55.1 -54.8 -55.2 63 -99 SPO 1997 04 21 02 54 36 6.3 -9 682.10 -55.1 -54.8 -55.2 63 -99 SPO 1997 04 21 02 55 37 6.6 -9 682.00 -55.0 -54.7 -55.1 62 -99 SPO 1997 04 21 02 56 36 6.4 -9 682.10 -55.1 -54.8 -55.2 63 -99 SPO 1997 04 21 02 57 37 6.5 -9 682.00 -55.1 -54.8 -55.1 63 -99 SPO 1997 04 21 02 58 36 6.5 -9 682.10 -55.1 -54.8 -55.1 63 -99 SPO 1997 04 21 02 59 37 6.3 -9 682.10 -55.1 -54.7 -55.1 63 -99 SPO 1997 04 21 03 00 38 6.3 -9 682.10 -55.1 -54.7 -55.2 63 0 SPO 1997 04 21 03 01 38 5.9 -9 682.10 -55.1 -54.8 -55.2 63 -99 SPO 1997 04 21 03 02 38 5.9 -9 682.10 -55.2 -54.8 -55.2 64 -99 SPO 1997 04 21 03 03 39 6.2 -9 682.10 -55.2 -54.8 -55.2 64 -99 SPO 1997 04 21 03 04 38 6.3 -9 682.10 -55.2 -54.7 -55.2 63 -99 SPO 1997 04 21 03 05 39 6.0 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 03 06 38 6.1 -9 682.10 -55.1 -54.7 -55.2 63 -99 SPO 1997 04 21 03 07 37 6.1 -9 682.10 -54.9 -54.7 -55.0 62 -99 SPO 1997 04 21 03 08 37 6.3 -9 682.00 -55.0 -54.7 -55.0 63 -99 SPO 1997 04 21 03 09 39 6.4 -9 682.10 -54.9 -54.8 -55.0 63 -99 SPO 1997 04 21 03 10 36 6.2 -9 682.10 -54.9 -54.8 -55.0 64 -99 SPO 1997 04 21 03 11 37 6.3 -9 682.00 -54.9 -54.8 -55.0 64 -99 SPO 1997 04 21 03 12 36 6.0 -9 682.00 -55.0 -54.8 -55.0 65 -99 SPO 1997 04 21 03 13 38 6.2 -9 682.00 -55.0 -54.8 -55.0 65 -99 SPO 1997 04 21 03 14 36 6.3 -9 682.00 -55.0 -54.8 -55.1 64 -99 SPO 1997 04 21 03 15 35 6.1 -9 682.00 -55.0 -54.8 -55.1 63 -99 SPO 1997 04 21 03 16 36 6.2 -9 682.00 -54.9 -54.7 -55.0 62 -99 SPO 1997 04 21 03 17 35 6.3 -9 682.00 -55.0 -54.7 -55.0 64 -99 SPO 1997 04 21 03 18 35 6.4 -9 682.00 -55.0 -54.7 -55.1 64 -99 SPO 1997 04 21 03 19 36 6.4 -9 682.00 -55.0 -54.8 -55.0 64 -99 SPO 1997 04 21 03 20 36 6.1 -9 681.90 -55.0 -54.8 -55.1 64 -99 SPO 1997 04 21 03 21 36 6.3 -9 682.00 -55.1 -54.8 -55.1 65 -99 SPO 1997 04 21 03 22 35 6.5 -9 682.00 -55.1 -54.8 -55.2 64 -99 SPO 1997 04 21 03 23 36 6.5 -9 681.90 -55.1 -54.8 -55.2 63 -99 SPO 1997 04 21 03 24 36 6.3 -9 681.90 -55.1 -54.8 -55.2 62 -99 SPO 1997 04 21 03 25 36 6.5 -9 681.90 -55.2 -54.9 -55.2 62 -99 SPO 1997 04 21 03 26 36 6.3 -9 681.90 -55.2 -54.9 -55.2 62 -99 SPO 1997 04 21 03 27 36 6.3 -9 681.90 -55.2 -55.0 -55.2 62 -99 SPO 1997 04 21 03 28 34 6.5 -9 681.90 -55.2 -54.9 -55.2 62 -99 SPO 1997 04 21 03 29 35 6.5 -9 681.90 -55.2 -54.9 -55.2 62 -99 SPO 1997 04 21 03 30 34 6.8 -9 682.00 -55.2 -54.9 -55.2 62 -99 SPO 1997 04 21 03 31 35 6.6 -9 681.90 -55.1 -54.9 -55.2 62 -99 SPO 1997 04 21 03 32 35 5.9 -9 681.90 -55.2 -54.9 -55.3 63 -99 SPO 1997 04 21 03 33 36 6.2 -9 682.00 -55.3 -54.9 -55.4 64 -99 SPO 1997 04 21 03 34 37 5.8 -9 682.00 -55.3 -54.9 -55.3 64 -99 SPO 1997 04 21 03 35 37 5.7 -9 681.90 -55.4 -54.9 -55.4 64 -99 SPO 1997 04 21 03 36 38 5.5 -9 681.90 -55.4 -55.0 -55.5 63 -99 SPO 1997 04 21 03 37 38 5.4 -9 682.00 -55.4 -55.0 -55.5 62 -99 SPO 1997 04 21 03 38 39 5.4 -9 682.00 -55.5 -55.0 -55.5 62 -99 SPO 1997 04 21 03 39 39 5.3 -9 682.00 -55.5 -55.1 -55.5 62 -99 SPO 1997 04 21 03 40 39 5.2 -9 682.00 -55.6 -55.1 -55.6 62 -99 SPO 1997 04 21 03 41 39 5.1 -9 682.00 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 21 03 42 39 4.8 -9 682.00 -55.8 -55.2 -55.7 64 -99 SPO 1997 04 21 03 43 40 5.2 -9 682.00 -55.7 -55.2 -55.7 63 -99 SPO 1997 04 21 03 44 39 5.1 -9 682.00 -55.7 -55.2 -55.7 63 -99 SPO 1997 04 21 03 45 39 5.4 -9 682.00 -55.6 -55.2 -55.7 62 -99 SPO 1997 04 21 03 46 39 5.1 -9 682.00 -55.6 -55.2 -55.7 63 -99 SPO 1997 04 21 03 47 41 5.4 -9 681.90 -55.6 -55.2 -55.6 63 -99 SPO 1997 04 21 03 48 41 5.4 -9 681.90 -55.6 -55.1 -55.6 63 -99 SPO 1997 04 21 03 49 42 5.4 -9 681.90 -55.6 -55.1 -55.6 63 -99 SPO 1997 04 21 03 50 43 5.0 -9 681.90 -55.6 -55.1 -55.6 62 -99 SPO 1997 04 21 03 51 41 4.7 -9 681.90 -55.6 -55.2 -55.7 63 -99 SPO 1997 04 21 03 52 42 5.0 -9 681.90 -55.6 -55.2 -55.7 63 -99 SPO 1997 04 21 03 53 43 5.0 -9 681.90 -55.5 -55.2 -55.6 62 -99 SPO 1997 04 21 03 54 45 4.8 -9 681.90 -55.6 -55.1 -55.7 63 -99 SPO 1997 04 21 03 55 43 4.9 -9 681.90 -55.7 -55.2 -55.8 63 -99 SPO 1997 04 21 03 56 43 4.7 -9 681.90 -55.8 -55.2 -55.8 64 -99 SPO 1997 04 21 03 57 44 4.8 -9 681.90 -55.8 -55.2 -55.8 62 -99 SPO 1997 04 21 03 58 44 5.1 -9 681.90 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 21 03 59 46 4.9 -9 681.90 -55.8 -55.3 -55.8 62 -99 SPO 1997 04 21 04 00 46 4.9 -9 681.90 -55.8 -55.3 -55.9 62 0 SPO 1997 04 21 04 01 46 4.9 -9 681.80 -55.8 -55.3 -55.8 61 -99 SPO 1997 04 21 04 02 46 4.9 -9 681.80 -55.8 -55.3 -55.9 61 -99 SPO 1997 04 21 04 03 46 5.0 -9 681.80 -55.9 -55.3 -55.9 63 -99 SPO 1997 04 21 04 04 45 5.1 -9 681.80 -56.0 -55.4 -56.0 64 -99 SPO 1997 04 21 04 05 45 5.0 -9 681.80 -56.0 -55.4 -56.0 64 -99 SPO 1997 04 21 04 06 44 5.0 -9 681.80 -56.1 -55.4 -56.0 64 -99 SPO 1997 04 21 04 07 42 5.3 -9 681.80 -56.0 -55.3 -56.0 63 -99 SPO 1997 04 21 04 08 41 5.3 -9 681.70 -56.0 -55.3 -56.1 63 -99 SPO 1997 04 21 04 09 41 5.4 -9 681.70 -56.0 -55.4 -56.1 62 -99 SPO 1997 04 21 04 10 40 5.4 -9 681.70 -56.2 -55.3 -56.2 63 -99 SPO 1997 04 21 04 11 40 5.4 -9 681.70 -56.2 -55.3 -56.2 62 -99 SPO 1997 04 21 04 12 39 5.5 -9 681.70 -56.2 -55.3 -56.2 61 -99 SPO 1997 04 21 04 13 40 5.3 -9 681.80 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 21 04 14 41 5.2 -9 681.70 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 21 04 15 41 5.3 -9 681.70 -56.2 -55.4 -56.2 61 -99 SPO 1997 04 21 04 16 41 5.4 -9 681.70 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 21 04 17 42 5.2 -9 681.80 -56.2 -55.5 -56.2 61 -99 SPO 1997 04 21 04 18 43 5.1 -9 681.80 -56.2 -55.5 -56.3 62 -99 SPO 1997 04 21 04 19 43 5.0 -9 681.80 -56.4 -55.5 -56.4 64 -99 SPO 1997 04 21 04 20 45 4.9 -9 681.80 -56.5 -55.5 -56.4 66 -99 SPO 1997 04 21 04 21 46 4.7 -9 681.70 -56.4 -55.6 -56.4 65 -99 SPO 1997 04 21 04 22 47 4.8 -9 681.70 -56.4 -55.6 -56.5 64 -99 SPO 1997 04 21 04 23 46 4.7 -9 681.70 -56.5 -55.6 -56.5 64 -99 SPO 1997 04 21 04 24 46 4.6 -9 681.70 -56.6 -55.6 -56.6 64 -99 SPO 1997 04 21 04 25 45 4.8 -9 681.70 -56.6 -55.6 -56.6 64 -99 SPO 1997 04 21 04 26 46 4.6 -9 681.70 -56.6 -55.7 -56.6 64 -99 SPO 1997 04 21 04 27 44 4.8 -9 681.70 -56.7 -55.7 -56.7 64 -99 SPO 1997 04 21 04 28 44 4.8 -9 681.70 -56.7 -55.6 -56.7 64 -99 SPO 1997 04 21 04 29 43 4.7 -9 681.70 -56.8 -55.7 -56.7 64 -99 SPO 1997 04 21 04 30 43 4.9 -9 681.70 -56.8 -55.7 -56.8 64 -99 SPO 1997 04 21 04 31 42 5.0 -9 681.70 -56.8 -55.8 -56.8 64 -99 SPO 1997 04 21 04 32 43 5.2 -9 681.60 -56.9 -55.8 -56.9 64 -99 SPO 1997 04 21 04 33 42 5.1 -9 681.60 -56.8 -55.8 -56.9 62 -99 SPO 1997 04 21 04 34 41 5.2 -9 681.60 -56.9 -55.8 -56.9 63 -99 SPO 1997 04 21 04 35 40 5.4 -9 681.70 -57.0 -55.7 -56.9 63 -99 SPO 1997 04 21 04 36 41 5.3 -9 681.70 -56.9 -55.7 -56.9 62 -99 SPO 1997 04 21 04 37 41 5.3 -9 681.60 -56.8 -55.7 -56.9 62 -99 SPO 1997 04 21 04 38 42 5.5 -9 681.60 -56.8 -55.7 -56.9 62 -99 SPO 1997 04 21 04 39 42 5.2 -9 681.70 -56.9 -55.7 -56.9 63 -99 SPO 1997 04 21 04 40 41 5.3 -9 681.60 -56.9 -55.6 -56.9 63 -99 SPO 1997 04 21 04 41 40 5.4 -9 681.60 -56.9 -55.6 -57.0 63 -99 SPO 1997 04 21 04 42 39 5.3 -9 681.60 -56.9 -55.6 -57.0 64 -99 SPO 1997 04 21 04 43 38 5.4 -9 681.60 -57.0 -55.6 -57.0 64 -99 SPO 1997 04 21 04 44 37 5.4 -9 681.60 -56.9 -55.6 -57.0 63 -99 SPO 1997 04 21 04 45 37 5.4 -9 681.60 -56.9 -55.5 -56.9 63 -99 SPO 1997 04 21 04 46 36 5.4 -9 681.60 -56.9 -55.6 -56.9 62 -99 SPO 1997 04 21 04 47 36 5.3 -9 681.60 -56.9 -55.6 -57.0 61 -99 SPO 1997 04 21 04 48 37 5.4 -9 681.60 -56.9 -55.7 -56.9 61 -99 SPO 1997 04 21 04 49 38 5.4 -9 681.60 -56.9 -55.7 -57.0 61 -99 SPO 1997 04 21 04 50 39 5.6 -9 681.60 -57.0 -55.6 -57.0 63 -99 SPO 1997 04 21 04 51 38 5.5 -9 681.60 -56.9 -55.7 -57.0 63 -99 SPO 1997 04 21 04 52 37 5.5 -9 681.60 -56.9 -55.7 -57.0 63 -99 SPO 1997 04 21 04 53 38 5.5 -9 681.50 -56.9 -55.7 -57.0 61 -99 SPO 1997 04 21 04 54 38 5.5 -9 681.50 -57.0 -55.7 -57.0 62 -99 SPO 1997 04 21 04 55 37 5.4 -9 681.50 -57.0 -55.7 -57.0 62 -99 SPO 1997 04 21 04 56 37 5.4 -9 681.50 -57.0 -55.6 -57.0 62 -99 SPO 1997 04 21 04 57 37 5.4 -9 681.50 -57.0 -55.7 -57.0 62 -99 SPO 1997 04 21 04 58 38 5.6 -9 681.60 -57.0 -55.7 -57.0 62 -99 SPO 1997 04 21 04 59 38 5.4 -9 681.60 -57.0 -55.7 -57.1 62 -99 SPO 1997 04 21 05 00 39 5.1 -9 681.60 -57.0 -55.7 -57.1 62 0 SPO 1997 04 21 05 01 41 5.2 -9 681.60 -57.1 -55.7 -57.1 63 -99 SPO 1997 04 21 05 02 42 5.4 -9 681.60 -57.1 -55.7 -57.2 63 -99 SPO 1997 04 21 05 03 42 5.6 -9 681.60 -57.1 -55.7 -57.2 63 -99 SPO 1997 04 21 05 04 42 5.3 -9 681.60 -57.1 -55.8 -57.2 63 -99 SPO 1997 04 21 05 05 42 4.9 -9 681.60 -57.2 -55.9 -57.2 63 -99 SPO 1997 04 21 05 06 41 5.0 -9 681.60 -57.2 -56.0 -57.3 61 -99 SPO 1997 04 21 05 07 41 4.8 -9 681.60 -57.3 -56.0 -57.3 60 -99 SPO 1997 04 21 05 08 41 5.1 -9 681.60 -57.3 -56.0 -57.3 60 -99 SPO 1997 04 21 05 09 41 5.3 -9 681.60 -57.3 -55.9 -57.4 60 -99 SPO 1997 04 21 05 10 40 5.1 -9 681.60 -57.4 -55.9 -57.4 60 -99 SPO 1997 04 21 05 11 40 5.4 -9 681.50 -57.3 -56.0 -57.4 60 -99 SPO 1997 04 21 05 12 40 5.5 -9 681.50 -57.3 -56.0 -57.4 60 -99 SPO 1997 04 21 05 13 40 5.5 -9 681.50 -57.3 -56.0 -57.4 60 -99 SPO 1997 04 21 05 14 39 5.4 -9 681.50 -57.3 -55.9 -57.4 60 -99 SPO 1997 04 21 05 15 39 5.5 -9 681.50 -57.3 -55.9 -57.4 60 -99 SPO 1997 04 21 05 16 41 5.3 -9 681.50 -57.4 -55.8 -57.4 61 -99 SPO 1997 04 21 05 17 40 5.3 -9 681.50 -57.3 -55.8 -57.4 60 -99 SPO 1997 04 21 05 18 41 5.4 -9 681.50 -57.3 -55.8 -57.3 60 -99 SPO 1997 04 21 05 19 41 5.6 -9 681.50 -57.2 -55.8 -57.3 57 -99 SPO 1997 04 21 05 20 40 5.5 -9 681.50 -57.2 -55.9 -57.2 57 -99 SPO 1997 04 21 05 21 40 5.4 -9 681.50 -57.1 -55.9 -57.2 58 -99 SPO 1997 04 21 05 22 41 5.3 -9 681.50 -57.1 -55.8 -57.2 58 -99 SPO 1997 04 21 05 23 41 5.4 -9 681.50 -57.1 -55.8 -57.2 59 -99 SPO 1997 04 21 05 24 42 5.1 -9 681.50 -57.0 -55.8 -57.1 59 -99 SPO 1997 04 21 05 25 42 5.0 -9 681.50 -57.1 -55.8 -57.2 60 -99 SPO 1997 04 21 05 26 42 5.1 -9 681.50 -57.1 -55.9 -57.2 60 -99 SPO 1997 04 21 05 27 42 5.1 -9 681.50 -57.1 -55.9 -57.2 60 -99 SPO 1997 04 21 05 28 42 4.9 -9 681.50 -57.0 -55.9 -57.1 60 -99 SPO 1997 04 21 05 29 41 4.9 -9 681.50 -57.1 -55.9 -57.2 60 -99 SPO 1997 04 21 05 30 41 4.9 -9 681.50 -57.1 -55.9 -57.2 60 -99 SPO 1997 04 21 05 31 40 4.7 -9 681.50 -57.1 -55.9 -57.2 60 -99 SPO 1997 04 21 05 32 41 4.9 -9 681.50 -57.0 -55.9 -57.1 58 -99 SPO 1997 04 21 05 33 41 5.0 -9 681.50 -57.0 -55.9 -57.1 59 -99 SPO 1997 04 21 05 34 40 5.1 -9 681.50 -57.0 -55.8 -57.1 59 -99 SPO 1997 04 21 05 35 41 4.9 -9 681.50 -56.9 -55.9 -57.0 59 -99 SPO 1997 04 21 05 36 40 5.1 -9 681.50 -56.9 -55.9 -57.0 60 -99 SPO 1997 04 21 05 37 39 5.0 -9 681.50 -56.8 -55.9 -57.0 60 -99 SPO 1997 04 21 05 38 39 5.0 -9 681.50 -56.8 -55.9 -56.9 60 -99 SPO 1997 04 21 05 39 39 5.1 -9 681.50 -56.8 -55.9 -56.9 60 -99 SPO 1997 04 21 05 40 39 5.2 -9 681.40 -56.9 -55.9 -56.9 62 -99 SPO 1997 04 21 05 41 38 5.4 -9 681.40 -56.8 -55.9 -56.9 60 -99 SPO 1997 04 21 05 42 38 5.4 -9 681.40 -56.7 -55.8 -56.8 60 -99 SPO 1997 04 21 05 43 38 5.7 -9 681.40 -56.7 -55.8 -56.8 60 -99 SPO 1997 04 21 05 44 38 5.6 -9 681.40 -56.7 -55.7 -56.8 60 -99 SPO 1997 04 21 05 45 37 5.8 -9 681.40 -56.6 -55.7 -56.7 59 -99 SPO 1997 04 21 05 46 37 5.6 -9 681.40 -56.6 -55.7 -56.7 60 -99 SPO 1997 04 21 05 47 36 5.6 -9 681.40 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 05 48 34 6.0 -9 681.40 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 05 49 36 5.9 -9 681.40 -56.6 -55.6 -56.7 61 -99 SPO 1997 04 21 05 50 35 5.9 -9 681.40 -56.6 -55.6 -56.6 61 -99 SPO 1997 04 21 05 51 34 5.9 -9 681.40 -56.6 -55.5 -56.7 61 -99 SPO 1997 04 21 05 52 35 5.9 -9 681.40 -56.5 -55.6 -56.6 61 -99 SPO 1997 04 21 05 53 35 5.7 -9 681.40 -56.5 -55.6 -56.6 61 -99 SPO 1997 04 21 05 54 35 5.8 -9 681.40 -56.6 -55.6 -56.6 61 -99 SPO 1997 04 21 05 55 35 5.7 -9 681.40 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 05 56 35 6.1 -9 681.40 -56.8 -55.6 -56.8 62 -99 SPO 1997 04 21 05 57 35 6.1 -9 681.30 -56.7 -55.6 -56.7 60 -99 SPO 1997 04 21 05 58 36 6.0 -9 681.30 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 05 59 36 6.2 -9 681.30 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 06 00 36 6.0 -9 681.30 -56.7 -55.6 -56.8 61 0 SPO 1997 04 21 06 01 36 5.9 -9 681.30 -56.7 -55.6 -56.7 61 -99 SPO 1997 04 21 06 02 36 5.9 -9 681.30 -56.7 -55.6 -56.7 61 -99 SPO 1997 04 21 06 03 36 6.1 -9 681.30 -56.8 -55.5 -56.8 62 -99 SPO 1997 04 21 06 04 36 6.1 -9 681.30 -56.8 -55.5 -56.8 62 -99 SPO 1997 04 21 06 05 35 6.1 -9 681.30 -56.8 -55.5 -56.8 61 -99 SPO 1997 04 21 06 06 36 5.9 -9 681.30 -56.7 -55.5 -56.8 60 -99 SPO 1997 04 21 06 07 35 6.1 -9 681.30 -56.7 -55.6 -56.8 60 -99 SPO 1997 04 21 06 08 34 6.2 -9 681.30 -56.7 -55.6 -56.8 60 -99 SPO 1997 04 21 06 09 34 6.0 -9 681.30 -56.7 -55.6 -56.8 60 -99 SPO 1997 04 21 06 10 34 6.0 -9 681.20 -56.7 -55.6 -56.8 60 -99 SPO 1997 04 21 06 11 35 6.1 -9 681.20 -56.7 -55.6 -56.7 61 -99 SPO 1997 04 21 06 12 35 6.0 -9 681.20 -56.8 -55.6 -56.7 62 -99 SPO 1997 04 21 06 13 35 6.0 -9 681.20 -56.8 -55.6 -56.8 62 -99 SPO 1997 04 21 06 14 34 5.9 -9 681.20 -56.7 -55.7 -56.8 61 -99 SPO 1997 04 21 06 15 35 5.9 -9 681.10 -56.8 -55.7 -56.8 62 -99 SPO 1997 04 21 06 16 35 5.8 -9 681.10 -56.8 -55.6 -56.8 61 -99 SPO 1997 04 21 06 17 34 6.1 -9 681.10 -56.8 -55.6 -56.8 60 -99 SPO 1997 04 21 06 18 34 6.1 -9 681.10 -56.8 -55.6 -56.8 60 -99 SPO 1997 04 21 06 19 34 5.8 -9 681.10 -56.8 -55.7 -56.8 60 -99 SPO 1997 04 21 06 20 34 6.1 -9 681.10 -56.8 -55.7 -56.8 60 -99 SPO 1997 04 21 06 21 33 5.9 -9 681.10 -56.8 -55.6 -56.8 61 -99 SPO 1997 04 21 06 22 33 6.3 -9 681.10 -56.7 -55.6 -56.8 60 -99 SPO 1997 04 21 06 23 32 6.4 -9 681.10 -56.7 -55.6 -56.8 61 -99 SPO 1997 04 21 06 24 32 6.3 -9 681.10 -56.6 -55.6 -56.8 60 -99 SPO 1997 04 21 06 25 32 6.3 -9 681.10 -56.6 -55.6 -56.7 61 -99 SPO 1997 04 21 06 26 32 6.2 -9 681.10 -56.7 -55.6 -56.7 63 -99 SPO 1997 04 21 06 27 32 6.3 -9 681.10 -56.7 -55.6 -56.7 63 -99 SPO 1997 04 21 06 28 33 6.2 -9 681.10 -56.7 -55.7 -56.8 62 -99 SPO 1997 04 21 06 29 34 6.2 -9 681.10 -56.7 -55.8 -56.8 61 -99 SPO 1997 04 21 06 30 33 6.2 -9 681.10 -56.8 -55.8 -56.8 62 -99 SPO 1997 04 21 06 31 33 6.0 -9 681.20 -56.8 -55.7 -56.8 61 -99 SPO 1997 04 21 06 32 32 6.0 -9 681.20 -56.7 -55.8 -56.8 60 -99 SPO 1997 04 21 06 33 33 5.9 -9 681.10 -56.8 -55.8 -56.8 62 -99 SPO 1997 04 21 06 34 33 6.0 -9 681.10 -56.8 -55.7 -56.8 62 -99 SPO 1997 04 21 06 35 33 6.1 -9 681.10 -56.6 -55.6 -56.7 60 -99 SPO 1997 04 21 06 36 33 6.2 -9 681.10 -56.6 -55.6 -56.7 61 -99 SPO 1997 04 21 06 37 33 6.3 -9 681.10 -56.6 -55.6 -56.7 62 -99 SPO 1997 04 21 06 38 33 6.2 -9 681.10 -56.6 -55.6 -56.7 62 -99 SPO 1997 04 21 06 39 35 6.3 -9 681.10 -56.5 -55.6 -56.6 61 -99 SPO 1997 04 21 06 40 36 6.2 -9 681.10 -56.5 -55.6 -56.6 61 -99 SPO 1997 04 21 06 41 36 6.1 -9 681.10 -56.6 -55.7 -56.7 61 -99 SPO 1997 04 21 06 42 36 6.0 -9 681.10 -56.6 -55.8 -56.6 61 -99 SPO 1997 04 21 06 43 37 6.0 -9 681.20 -56.6 -55.8 -56.6 61 -99 SPO 1997 04 21 06 44 37 5.8 -9 681.20 -56.6 -55.8 -56.6 61 -99 SPO 1997 04 21 06 45 36 5.7 -9 681.10 -56.7 -55.9 -56.7 63 -99 SPO 1997 04 21 06 46 37 5.7 -9 681.10 -56.7 -55.8 -56.7 63 -99 SPO 1997 04 21 06 47 38 5.7 -9 681.10 -56.6 -55.9 -56.7 62 -99 SPO 1997 04 21 06 48 38 5.6 -9 681.10 -56.6 -56.0 -56.7 63 -99 SPO 1997 04 21 06 49 40 5.6 -9 681.10 -56.7 -56.0 -56.8 64 -99 SPO 1997 04 21 06 50 39 5.3 -9 681.10 -56.8 -56.0 -56.8 64 -99 SPO 1997 04 21 06 51 38 5.4 -9 681.10 -56.8 -56.0 -56.8 63 -99 SPO 1997 04 21 06 52 38 5.4 -9 681.10 -56.8 -55.9 -56.8 62 -99 SPO 1997 04 21 06 53 38 5.7 -9 681.10 -56.8 -55.9 -56.8 62 -99 SPO 1997 04 21 06 54 38 5.5 -9 681.00 -56.7 -55.9 -56.7 61 -99 SPO 1997 04 21 06 55 39 5.5 -9 681.00 -56.7 -55.9 -56.7 61 -99 SPO 1997 04 21 06 56 39 5.4 -9 681.00 -56.7 -56.0 -56.7 62 -99 SPO 1997 04 21 06 57 38 5.5 -9 681.00 -56.8 -56.0 -56.8 64 -99 SPO 1997 04 21 06 58 39 5.6 -9 681.00 -56.8 -56.1 -56.8 64 -99 SPO 1997 04 21 06 59 38 5.3 -9 681.10 -56.8 -56.1 -56.9 64 -99 SPO 1997 04 21 07 00 40 5.2 -9 681.00 -56.9 -56.2 -56.9 65 0 SPO 1997 04 21 07 01 39 5.4 -9 681.00 -56.9 -56.2 -57.0 64 -99 SPO 1997 04 21 07 02 39 5.3 -9 681.00 -57.0 -56.2 -57.0 64 -99 SPO 1997 04 21 07 03 39 5.5 -9 681.00 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 04 40 5.2 -9 681.00 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 05 38 5.3 -9 681.00 -57.1 -56.2 -57.1 63 -99 SPO 1997 04 21 07 06 38 5.3 -9 681.00 -57.0 -56.2 -57.1 63 -99 SPO 1997 04 21 07 07 38 5.1 -9 681.00 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 08 37 5.2 -9 681.00 -57.1 -56.2 -57.2 64 -99 SPO 1997 04 21 07 09 37 5.3 -9 681.00 -57.1 -56.2 -57.1 64 -99 SPO 1997 04 21 07 10 37 5.2 -9 681.00 -57.1 -56.2 -57.1 64 -99 SPO 1997 04 21 07 11 38 5.0 -9 681.00 -57.1 -56.2 -57.1 63 -99 SPO 1997 04 21 07 12 38 5.0 -9 681.00 -57.1 -56.2 -57.1 63 -99 SPO 1997 04 21 07 13 37 4.9 -9 681.00 -57.1 -56.2 -57.2 63 -99 SPO 1997 04 21 07 14 39 5.1 -9 681.00 -57.1 -56.2 -57.2 63 -99 SPO 1997 04 21 07 15 40 5.3 -9 681.00 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 16 41 5.1 -9 681.00 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 17 41 5.1 -9 681.00 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 18 42 5.0 -9 681.00 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 19 43 5.0 -9 681.00 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 20 43 4.8 -9 681.00 -57.0 -56.3 -57.1 63 -99 SPO 1997 04 21 07 21 44 4.9 -9 681.00 -57.1 -56.3 -57.2 63 -99 SPO 1997 04 21 07 22 44 5.0 -9 681.00 -57.1 -56.2 -57.2 63 -99 SPO 1997 04 21 07 23 43 5.2 -9 680.90 -57.2 -56.2 -57.2 63 -99 SPO 1997 04 21 07 24 43 5.0 -9 680.90 -57.1 -56.1 -57.2 63 -99 SPO 1997 04 21 07 25 44 5.2 -9 680.90 -57.1 -56.1 -57.2 63 -99 SPO 1997 04 21 07 26 44 5.4 -9 680.90 -57.0 -56.1 -57.1 61 -99 SPO 1997 04 21 07 27 44 5.0 -9 680.90 -57.0 -56.2 -57.0 61 -99 SPO 1997 04 21 07 28 43 5.2 -9 680.90 -57.0 -56.2 -57.1 61 -99 SPO 1997 04 21 07 29 43 5.3 -9 680.90 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 30 41 5.6 -9 680.90 -57.0 -56.2 -57.1 62 -99 SPO 1997 04 21 07 31 41 5.7 -9 680.90 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 32 40 5.8 -9 680.80 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 33 40 5.7 -9 680.80 -57.0 -56.2 -57.0 63 -99 SPO 1997 04 21 07 34 40 5.5 -9 680.80 -57.0 -56.2 -57.1 63 -99 SPO 1997 04 21 07 35 39 5.8 -9 680.80 -57.0 -56.1 -57.0 63 -99 SPO 1997 04 21 07 36 40 5.8 -9 680.80 -56.9 -56.1 -57.0 62 -99 SPO 1997 04 21 07 37 38 5.9 -9 680.70 -56.9 -56.1 -57.0 61 -99 SPO 1997 04 21 07 38 37 6.1 -9 680.70 -56.9 -56.0 -57.0 61 -99 SPO 1997 04 21 07 39 36 6.3 -9 680.70 -56.9 -56.0 -57.0 62 -99 SPO 1997 04 21 07 40 36 6.5 -9 680.70 -56.8 -56.0 -56.9 61 -99 SPO 1997 04 21 07 41 35 6.3 -9 680.70 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 42 34 6.2 -9 680.70 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 43 35 6.3 -9 680.70 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 44 34 6.3 -9 680.70 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 45 33 6.4 -9 680.70 -56.8 -55.9 -56.9 63 -99 SPO 1997 04 21 07 46 32 6.7 -9 680.70 -56.8 -55.9 -56.9 63 -99 SPO 1997 04 21 07 47 31 6.6 -9 680.60 -56.7 -55.9 -56.8 62 -99 SPO 1997 04 21 07 48 31 6.6 -9 680.60 -56.7 -55.9 -56.8 61 -99 SPO 1997 04 21 07 49 31 6.7 -9 680.60 -56.8 -55.9 -56.8 62 -99 SPO 1997 04 21 07 50 32 6.9 -9 680.60 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 51 31 6.9 -9 680.60 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 52 32 7.0 -9 680.60 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 53 32 6.8 -9 680.60 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 07 54 32 6.8 -9 680.60 -56.9 -56.0 -57.0 63 -99 SPO 1997 04 21 07 55 33 6.8 -9 680.60 -56.9 -55.9 -56.9 63 -99 SPO 1997 04 21 07 56 33 6.6 -9 680.60 -56.9 -56.0 -56.9 64 -99 SPO 1997 04 21 07 57 33 6.6 -9 680.60 -56.9 -56.0 -57.0 64 -99 SPO 1997 04 21 07 58 33 6.6 -9 680.60 -56.9 -56.0 -57.0 63 -99 SPO 1997 04 21 07 59 34 6.5 -9 680.60 -57.0 -56.0 -57.0 63 -99 SPO 1997 04 21 08 00 34 6.7 -9 680.60 -56.9 -56.0 -57.0 62 0 SPO 1997 04 21 08 01 34 6.5 -9 680.60 -56.9 -56.0 -57.0 61 -99 SPO 1997 04 21 08 02 33 6.6 -9 680.60 -57.0 -56.1 -57.0 62 -99 SPO 1997 04 21 08 03 33 6.5 -9 680.60 -57.0 -56.1 -57.0 62 -99 SPO 1997 04 21 08 04 33 6.6 -9 680.60 -57.0 -56.1 -57.1 62 -99 SPO 1997 04 21 08 05 34 6.6 -9 680.60 -57.0 -56.1 -57.1 63 -99 SPO 1997 04 21 08 06 34 6.3 -9 680.60 -57.0 -56.1 -57.1 63 -99 SPO 1997 04 21 08 07 34 6.7 -9 680.60 -57.1 -56.0 -57.1 63 -99 SPO 1997 04 21 08 08 35 6.8 -9 680.50 -57.1 -56.0 -57.1 63 -99 SPO 1997 04 21 08 09 35 6.5 -9 680.50 -57.1 -56.1 -57.1 63 -99 SPO 1997 04 21 08 10 37 6.6 -9 680.50 -57.1 -56.1 -57.2 63 -99 SPO 1997 04 21 08 11 38 6.4 -9 680.60 -57.1 -56.2 -57.2 63 -99 SPO 1997 04 21 08 12 38 6.3 -9 680.50 -57.2 -56.2 -57.2 63 -99 SPO 1997 04 21 08 13 38 6.2 -9 680.50 -57.3 -56.1 -57.3 63 -99 SPO 1997 04 21 08 14 39 6.2 -9 680.50 -57.3 -56.2 -57.3 63 -99 SPO 1997 04 21 08 15 39 6.2 -9 680.50 -57.2 -56.1 -57.2 62 -99 SPO 1997 04 21 08 16 38 6.1 -9 680.50 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 17 37 6.2 -9 680.50 -57.2 -56.2 -57.2 63 -99 SPO 1997 04 21 08 18 37 6.4 -9 680.50 -57.2 -56.2 -57.2 63 -99 SPO 1997 04 21 08 19 37 6.3 -9 680.50 -57.2 -56.2 -57.2 63 -99 SPO 1997 04 21 08 20 37 6.5 -9 680.50 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 21 36 6.6 -9 680.50 -57.0 -56.1 -57.2 61 -99 SPO 1997 04 21 08 22 35 6.6 -9 680.50 -57.1 -56.1 -57.2 62 -99 SPO 1997 04 21 08 23 35 6.9 -9 680.50 -57.2 -56.1 -57.2 62 -99 SPO 1997 04 21 08 24 34 7.0 -9 680.50 -57.1 -56.1 -57.2 61 -99 SPO 1997 04 21 08 25 34 7.0 -9 680.50 -57.1 -56.0 -57.1 61 -99 SPO 1997 04 21 08 26 34 6.9 -9 680.50 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 08 27 34 6.8 -9 680.40 -57.1 -56.0 -57.2 63 -99 SPO 1997 04 21 08 28 35 6.7 -9 680.40 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 29 36 6.9 -9 680.40 -57.2 -56.0 -57.3 63 -99 SPO 1997 04 21 08 30 35 6.8 -9 680.40 -57.2 -56.0 -57.2 63 -99 SPO 1997 04 21 08 31 36 7.0 -9 680.40 -57.1 -56.0 -57.2 63 -99 SPO 1997 04 21 08 32 36 6.9 -9 680.40 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 08 33 36 7.3 -9 680.40 -57.2 -56.0 -57.2 62 -99 SPO 1997 04 21 08 34 35 7.3 -9 680.40 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 08 35 35 7.3 -9 680.40 -57.1 -56.0 -57.1 62 -99 SPO 1997 04 21 08 36 35 7.1 -9 680.40 -57.1 -56.1 -57.2 62 -99 SPO 1997 04 21 08 37 35 6.9 -9 680.40 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 38 35 6.8 -9 680.40 -57.2 -56.1 -57.3 63 -99 SPO 1997 04 21 08 39 36 6.8 -9 680.40 -57.2 -56.1 -57.3 63 -99 SPO 1997 04 21 08 40 36 6.8 -9 680.40 -57.2 -56.1 -57.3 63 -99 SPO 1997 04 21 08 41 35 6.8 -9 680.30 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 42 35 6.9 -9 680.30 -57.2 -56.1 -57.2 63 -99 SPO 1997 04 21 08 43 34 7.1 -9 680.30 -57.2 -56.1 -57.3 62 -99 SPO 1997 04 21 08 44 34 7.1 -9 680.30 -57.2 -56.0 -57.2 62 -99 SPO 1997 04 21 08 45 34 7.2 -9 680.30 -57.0 -56.0 -57.1 60 -99 SPO 1997 04 21 08 46 34 7.1 -9 680.30 -57.0 -56.0 -57.1 60 -99 SPO 1997 04 21 08 47 34 7.2 -9 680.30 -57.1 -56.0 -57.2 61 -99 SPO 1997 04 21 08 48 33 7.4 -9 680.30 -57.0 -55.9 -57.1 60 -99 SPO 1997 04 21 08 49 32 7.3 -9 680.30 -57.0 -56.0 -57.1 61 -99 SPO 1997 04 21 08 50 31 7.2 -9 680.30 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 08 51 32 7.2 -9 680.30 -57.1 -56.0 -57.2 63 -99 SPO 1997 04 21 08 52 32 7.4 -9 680.30 -57.1 -56.0 -57.2 63 -99 SPO 1997 04 21 08 53 33 7.3 -9 680.30 -57.0 -56.0 -57.1 62 -99 SPO 1997 04 21 08 54 33 7.2 -9 680.30 -57.0 -56.1 -57.1 62 -99 SPO 1997 04 21 08 55 33 6.9 -9 680.30 -57.1 -56.1 -57.2 63 -99 SPO 1997 04 21 08 56 33 7.0 -9 680.30 -57.2 -56.0 -57.2 63 -99 SPO 1997 04 21 08 57 34 6.9 -9 680.30 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 08 58 33 7.0 -9 680.30 -57.1 -56.1 -57.2 62 -99 SPO 1997 04 21 08 59 33 7.0 -9 680.30 -57.1 -56.0 -57.2 62 -99 SPO 1997 04 21 09 00 35 6.9 -9 680.30 -57.1 -55.9 -57.1 62 0 SPO 1997 04 21 09 01 35 6.8 -9 680.30 -57.1 -55.9 -57.1 63 -99 SPO 1997 04 21 09 02 36 6.8 -9 680.20 -57.0 -55.9 -57.1 62 -99 SPO 1997 04 21 09 03 37 6.8 -9 680.20 -57.0 -55.8 -57.1 63 -99 SPO 1997 04 21 09 04 38 6.7 -9 680.20 -57.0 -55.8 -57.1 63 -99 SPO 1997 04 21 09 05 38 6.7 -9 680.20 -57.0 -55.8 -57.1 63 -99 SPO 1997 04 21 09 06 37 6.9 -9 680.20 -57.0 -55.8 -57.0 62 -99 SPO 1997 04 21 09 07 39 6.8 -9 680.20 -56.9 -55.7 -57.0 62 -99 SPO 1997 04 21 09 08 39 6.3 -9 680.20 -56.8 -55.9 -56.9 61 -99 SPO 1997 04 21 09 09 39 6.8 -9 680.20 -56.8 -55.9 -57.0 62 -99 SPO 1997 04 21 09 10 40 6.7 -9 680.20 -56.8 -55.9 -56.9 62 -99 SPO 1997 04 21 09 11 37 6.8 -9 680.20 -56.8 -55.8 -56.9 62 -99 SPO 1997 04 21 09 12 35 7.7 -9 680.10 -56.6 -55.7 -56.8 61 -99 SPO 1997 04 21 09 13 36 7.8 -9 680.10 -56.5 -55.5 -56.7 61 -99 SPO 1997 04 21 09 14 37 7.4 -9 680.10 -56.6 -55.6 -56.7 64 -99 SPO 1997 04 21 09 15 37 7.1 -9 680.10 -56.6 -55.6 -56.7 64 -99 SPO 1997 04 21 09 16 37 7.2 -9 680.10 -56.6 -55.6 -56.7 64 -99 SPO 1997 04 21 09 17 35 7.0 -9 680.10 -56.5 -55.6 -56.6 63 -99 SPO 1997 04 21 09 18 32 8.4 -9 680.00 -56.5 -55.4 -56.6 62 -99 SPO 1997 04 21 09 19 34 8.2 -9 680.00 -56.4 -55.2 -56.4 61 -99 SPO 1997 04 21 09 20 36 7.7 -9 680.00 -56.4 -55.4 -56.5 62 -99 SPO 1997 04 21 09 21 35 7.5 -9 680.00 -56.6 -55.4 -56.6 63 -99 SPO 1997 04 21 09 22 32 8.3 -9 680.00 -56.6 -55.3 -56.7 63 -99 SPO 1997 04 21 09 23 33 9.0 -9 680.00 -56.3 -55.0 -56.4 61 -99 SPO 1997 04 21 09 24 36 8.5 -9 680.00 -56.2 -55.1 -56.3 62 -99 SPO 1997 04 21 09 25 37 7.8 -9 680.00 -56.4 -55.4 -56.4 64 -99 SPO 1997 04 21 09 26 37 7.5 -9 680.00 -56.6 -55.8 -56.6 66 -99 SPO 1997 04 21 09 27 39 7.2 -9 680.00 -56.8 -55.9 -56.9 67 -99 SPO 1997 04 21 09 28 38 7.5 -9 680.00 -57.0 -56.0 -57.1 67 -99 SPO 1997 04 21 09 29 37 7.7 -9 680.00 -57.1 -55.9 -57.1 66 -99 SPO 1997 04 21 09 30 35 7.6 -9 680.00 -57.1 -55.8 -57.1 64 -99 SPO 1997 04 21 09 31 34 7.9 -9 680.00 -57.0 -55.7 -57.0 63 -99 SPO 1997 04 21 09 32 32 8.0 -9 680.00 -56.9 -55.6 -57.0 63 -99 SPO 1997 04 21 09 33 32 8.4 -9 679.90 -56.9 -55.5 -56.9 63 -99 SPO 1997 04 21 09 34 32 8.4 -9 679.90 -56.8 -55.4 -56.8 63 -99 SPO 1997 04 21 09 35 31 8.4 -9 679.90 -56.7 -55.4 -56.8 63 -99 SPO 1997 04 21 09 36 32 8.4 -9 679.90 -56.7 -55.2 -56.8 64 -99 SPO 1997 04 21 09 37 31 8.5 -9 679.90 -56.7 -55.2 -56.8 64 -99 SPO 1997 04 21 09 38 30 8.5 -9 679.90 -56.6 -55.1 -56.7 63 -99 SPO 1997 04 21 09 39 31 8.3 -9 679.90 -56.5 -55.2 -56.6 63 -99 SPO 1997 04 21 09 40 32 8.4 -9 679.90 -56.5 -55.2 -56.6 63 -99 SPO 1997 04 21 09 41 34 8.1 -9 679.90 -56.6 -55.3 -56.6 64 -99 SPO 1997 04 21 09 42 33 7.8 -9 679.90 -56.6 -55.4 -56.6 64 -99 SPO 1997 04 21 09 43 32 7.9 -9 679.90 -56.7 -55.4 -56.7 64 -99 SPO 1997 04 21 09 44 32 7.8 -9 679.90 -56.7 -55.4 -56.7 64 -99 SPO 1997 04 21 09 45 31 7.8 -9 679.90 -56.6 -55.4 -56.7 63 -99 SPO 1997 04 21 09 46 31 7.7 -9 679.90 -56.7 -55.4 -56.8 64 -99 SPO 1997 04 21 09 47 32 8.1 -9 679.90 -56.7 -55.3 -56.8 64 -99 SPO 1997 04 21 09 48 33 8.1 -9 679.90 -56.6 -55.2 -56.7 64 -99 SPO 1997 04 21 09 49 34 8.1 -9 679.90 -56.6 -55.1 -56.7 64 -99 SPO 1997 04 21 09 50 35 8.2 -9 679.90 -56.6 -54.9 -56.6 64 -99 SPO 1997 04 21 09 51 35 8.0 -9 679.90 -56.5 -55.0 -56.6 63 -99 SPO 1997 04 21 09 52 36 7.7 -9 679.90 -56.6 -55.0 -56.7 64 -99 SPO 1997 04 21 09 53 37 8.2 -9 679.90 -56.6 -55.0 -56.7 63 -99 SPO 1997 04 21 09 54 38 8.5 -9 679.80 -56.5 -54.9 -56.6 61 -99 SPO 1997 04 21 09 55 38 8.1 -9 679.80 -56.6 -55.1 -56.6 63 -99 SPO 1997 04 21 09 56 38 7.6 -9 679.90 -56.7 -55.3 -56.8 64 -99 SPO 1997 04 21 09 57 38 7.5 -9 679.90 -56.9 -55.4 -56.9 65 -99 SPO 1997 04 21 09 58 39 7.7 -9 679.80 -57.0 -55.4 -57.0 65 -99 SPO 1997 04 21 09 59 38 7.8 -9 679.80 -57.1 -55.0 -57.1 65 -99 SPO 1997 04 21 10 00 38 8.1 -9 679.80 -57.1 -54.9 -57.1 64 0 SPO 1997 04 21 10 01 38 7.8 -9 679.80 -56.8 -55.0 -56.8 63 -99 SPO 1997 04 21 10 02 41 7.4 -9 679.80 -56.8 -55.2 -56.9 63 -99 SPO 1997 04 21 10 03 42 7.3 -9 679.80 -57.0 -55.6 -57.0 64 -99 SPO 1997 04 21 10 04 43 7.1 -9 679.80 -57.2 -55.7 -57.2 64 -99 SPO 1997 04 21 10 05 42 7.2 -9 679.80 -57.2 -55.6 -57.2 63 -99 SPO 1997 04 21 10 06 40 7.3 -9 679.80 -57.1 -55.4 -57.1 62 -99 SPO 1997 04 21 10 07 38 6.9 -9 679.80 -56.9 -55.5 -56.9 61 -99 SPO 1997 04 21 10 08 41 6.5 -9 679.80 -56.8 -55.8 -56.8 62 -99 SPO 1997 04 21 10 09 42 6.6 -9 679.80 -57.1 -56.1 -57.2 64 -99 SPO 1997 04 21 10 10 45 6.8 -9 679.80 -57.4 -56.1 -57.4 66 -99 SPO 1997 04 21 10 11 40 6.4 -9 679.80 -57.6 -56.2 -57.6 67 -99 SPO 1997 04 21 10 12 43 6.9 -9 679.80 -57.7 -56.0 -57.6 66 -99 SPO 1997 04 21 10 13 41 6.9 -9 679.80 -57.7 -55.2 -57.7 65 -99 SPO 1997 04 21 10 14 39 6.2 -9 679.80 -57.7 -56.0 -57.6 64 -99 SPO 1997 04 21 10 15 44 6.4 -9 679.80 -57.7 -56.1 -57.6 64 -99 SPO 1997 04 21 10 16 44 6.4 -9 679.70 -57.7 -55.8 -57.6 63 -99 SPO 1997 04 21 10 17 37 5.7 -9 679.70 -57.7 -56.3 -57.7 63 -99 SPO 1997 04 21 10 18 42 6.3 -9 679.80 -57.6 -56.4 -57.6 63 -99 SPO 1997 04 21 10 19 44 6.5 -9 679.70 -57.6 -55.8 -57.6 63 -99 SPO 1997 04 21 10 20 45 6.8 -9 679.70 -57.6 -55.6 -57.6 63 -99 SPO 1997 04 21 10 21 46 7.0 -9 679.70 -57.6 -55.5 -57.6 63 -99 SPO 1997 04 21 10 22 47 6.9 -9 679.70 -57.6 -55.6 -57.6 64 -99 SPO 1997 04 21 10 23 50 7.1 -9 679.60 -57.6 -55.1 -57.6 64 -99 SPO 1997 04 21 10 24 47 6.6 -9 679.60 -57.6 -55.6 -57.6 63 -99 SPO 1997 04 21 10 25 49 6.7 -9 679.70 -57.8 -55.7 -57.8 64 -99 SPO 1997 04 21 10 26 51 6.6 -9 679.60 -57.7 -55.5 -57.7 63 -99 SPO 1997 04 21 10 27 50 6.5 -9 679.60 -57.8 -55.8 -57.8 62 -99 SPO 1997 04 21 10 28 49 6.6 -9 679.60 -57.8 -56.1 -57.9 61 -99 SPO 1997 04 21 10 29 48 6.7 -9 679.60 -57.9 -56.2 -58.0 62 -99 SPO 1997 04 21 10 30 50 6.6 -9 679.60 -58.0 -55.8 -58.0 62 -99 SPO 1997 04 21 10 31 46 6.0 -9 679.60 -58.0 -56.0 -58.0 62 -99 SPO 1997 04 21 10 32 44 6.5 -9 679.60 -58.0 -56.0 -58.0 62 -99 SPO 1997 04 21 10 33 45 6.4 -9 679.70 -57.9 -56.1 -57.9 62 -99 SPO 1997 04 21 10 34 44 6.6 -9 679.60 -57.8 -55.8 -57.9 62 -99 SPO 1997 04 21 10 35 44 6.5 -9 679.60 -57.8 -55.9 -57.8 62 -99 SPO 1997 04 21 10 36 47 6.6 -9 679.60 -57.7 -55.9 -57.7 61 -99 SPO 1997 04 21 10 37 44 6.3 -9 679.60 -57.6 -56.2 -57.7 62 -99 SPO 1997 04 21 10 38 46 6.2 -9 679.60 -57.7 -56.2 -57.8 61 -99 SPO 1997 04 21 10 39 46 6.6 -9 679.60 -57.7 -55.8 -57.8 61 -99 SPO 1997 04 21 10 40 42 6.9 -9 679.60 -57.6 -55.8 -57.6 60 -99 SPO 1997 04 21 10 41 43 6.8 -9 679.70 -57.4 -55.6 -57.6 59 -99 SPO 1997 04 21 10 42 43 6.6 -9 679.70 -57.3 -55.7 -57.5 60 -99 SPO 1997 04 21 10 43 43 6.7 -9 679.70 -57.3 -55.9 -57.4 61 -99 SPO 1997 04 21 10 44 43 6.6 -9 679.70 -57.3 -55.9 -57.4 62 -99 SPO 1997 04 21 10 45 43 6.7 -9 679.70 -57.3 -55.7 -57.4 63 -99 SPO 1997 04 21 10 46 41 6.6 -9 679.70 -57.2 -55.7 -57.4 63 -99 SPO 1997 04 21 10 47 43 7.2 -9 679.70 -57.1 -55.3 -57.2 62 -99 SPO 1997 04 21 10 48 42 7.3 -9 679.60 -57.0 -55.2 -57.1 61 -99 SPO 1997 04 21 10 49 42 7.3 -9 679.60 -57.0 -55.2 -57.1 62 -99 SPO 1997 04 21 10 50 41 7.3 -9 679.60 -57.0 -55.1 -57.1 62 -99 SPO 1997 04 21 10 51 43 7.3 -9 679.60 -57.0 -55.2 -57.1 62 -99 SPO 1997 04 21 10 52 45 7.2 -9 679.60 -56.9 -54.6 -57.1 62 -99 SPO 1997 04 21 10 53 45 7.2 -9 679.60 -56.9 -55.0 -57.0 62 -99 SPO 1997 04 21 10 54 46 7.2 -9 679.60 -56.8 -55.2 -56.9 62 -99 SPO 1997 04 21 10 55 46 6.7 -9 679.60 -56.8 -55.2 -57.0 62 -99 SPO 1997 04 21 10 56 46 7.1 -9 679.60 -56.8 -55.0 -56.9 63 -99 SPO 1997 04 21 10 57 47 6.8 -9 679.60 -56.7 -55.3 -56.8 62 -99 SPO 1997 04 21 10 58 48 6.7 -9 679.60 -56.8 -55.5 -56.9 63 -99 SPO 1997 04 21 10 59 48 6.5 -9 679.60 -56.8 -55.5 -56.9 63 -99 SPO 1997 04 21 11 00 48 6.6 -9 679.60 -56.8 -55.6 -56.9 63 0 SPO 1997 04 21 11 01 52 6.6 -9 679.60 -56.8 -55.4 -56.8 62 -99 SPO 1997 04 21 11 02 49 6.2 -9 679.60 -56.8 -55.6 -56.9 62 -99 SPO 1997 04 21 11 03 49 6.6 -9 679.60 -56.9 -55.3 -56.9 63 -99 SPO 1997 04 21 11 04 47 6.6 -9 679.60 -56.8 -55.2 -56.8 63 -99 SPO 1997 04 21 11 05 47 7.1 -9 679.60 -56.4 -55.0 -56.4 61 -99 SPO 1997 04 21 11 06 49 6.9 -9 679.60 -56.2 -55.2 -56.4 61 -99 SPO 1997 04 21 11 07 49 6.9 -9 679.60 -56.5 -55.0 -56.7 64 -99 SPO 1997 04 21 11 08 46 6.2 -9 679.60 -56.6 -55.3 -56.7 64 -99 SPO 1997 04 21 11 09 48 6.2 -9 679.60 -56.5 -55.4 -56.6 64 -99 SPO 1997 04 21 11 10 49 6.4 -9 679.60 -56.5 -55.4 -56.6 64 -99 SPO 1997 04 21 11 11 47 6.7 -9 679.60 -56.5 -55.3 -56.6 63 -99 SPO 1997 04 21 11 12 46 6.3 -9 679.60 -56.5 -55.4 -56.6 62 -99 SPO 1997 04 21 11 13 46 6.5 -9 679.60 -56.6 -55.2 -56.7 63 -99 SPO 1997 04 21 11 14 44 6.8 -9 679.50 -56.5 -54.9 -56.6 62 -99 SPO 1997 04 21 11 15 44 6.4 -9 679.50 -56.2 -55.0 -56.4 61 -99 SPO 1997 04 21 11 16 45 6.3 -9 679.60 -56.3 -55.2 -56.4 62 -99 SPO 1997 04 21 11 17 45 6.6 -9 679.60 -56.4 -54.9 -56.4 64 -99 SPO 1997 04 21 11 18 43 6.6 -9 679.60 -56.2 -54.7 -56.4 63 -99 SPO 1997 04 21 11 19 43 7.0 -9 679.50 -56.1 -54.7 -56.2 63 -99 SPO 1997 04 21 11 20 43 6.8 -9 679.50 -56.2 -54.7 -56.2 64 -99 SPO 1997 04 21 11 21 45 6.4 -9 679.60 -56.1 -54.7 -56.2 64 -99 SPO 1997 04 21 11 22 45 6.2 -9 679.60 -56.1 -54.8 -56.2 64 -99 SPO 1997 04 21 11 23 47 6.1 -9 679.60 -56.2 -55.0 -56.3 64 -99 SPO 1997 04 21 11 24 49 6.0 -9 679.60 -56.4 -55.1 -56.5 64 -99 SPO 1997 04 21 11 25 51 6.3 -9 679.50 -56.6 -55.0 -56.7 65 -99 SPO 1997 04 21 11 26 51 6.3 -9 679.50 -56.7 -54.8 -56.8 65 -99 SPO 1997 04 21 11 27 50 6.3 -9 679.50 -56.8 -54.9 -56.8 65 -99 SPO 1997 04 21 11 28 49 6.3 -9 679.50 -56.9 -54.6 -56.9 66 -99 SPO 1997 04 21 11 29 47 6.1 -9 679.50 -56.9 -54.6 -56.9 65 -99 SPO 1997 04 21 11 30 49 6.7 -9 679.50 -56.6 -54.5 -56.6 63 -99 SPO 1997 04 21 11 31 50 6.5 -9 679.60 -56.4 -54.2 -56.4 62 -99 SPO 1997 04 21 11 32 56 6.0 -9 679.60 -56.7 -54.4 -56.6 65 -99 SPO 1997 04 21 11 33 58 5.8 -9 679.60 -57.2 -54.6 -57.2 68 -99 SPO 1997 04 21 11 34 59 5.5 -9 679.60 -57.6 -54.7 -57.4 68 -99 SPO 1997 04 21 11 35 58 5.6 -9 679.60 -57.8 -54.7 -57.7 67 -99 SPO 1997 04 21 11 36 59 5.5 -9 679.60 -57.8 -54.6 -57.6 65 -99 SPO 1997 04 21 11 37 53 6.5 -9 679.50 -57.0 -54.6 -57.0 60 -99 SPO 1997 04 21 11 38 61 5.6 -9 679.50 -56.6 -55.0 -56.7 59 -99 SPO 1997 04 21 11 39 66 5.7 -9 679.60 -57.0 -55.0 -57.0 63 -99 SPO 1997 04 21 11 40 68 5.6 -9 679.60 -57.6 -55.1 -57.4 67 -99 SPO 1997 04 21 11 41 69 5.5 -9 679.60 -58.0 -55.2 -57.8 68 -99 SPO 1997 04 21 11 42 70 5.6 -9 679.50 -58.2 -55.2 -58.0 68 -99 SPO 1997 04 21 11 43 69 5.7 -9 679.50 -58.3 -55.2 -58.1 66 -99 SPO 1997 04 21 11 44 68 5.8 -9 679.50 -58.2 -55.2 -58.1 63 -99 SPO 1997 04 21 11 45 69 5.7 -9 679.50 -58.3 -55.3 -58.1 63 -99 SPO 1997 04 21 11 46 69 5.8 -9 679.50 -58.3 -55.4 -58.1 62 -99 SPO 1997 04 21 11 47 68 5.7 -9 679.50 -58.3 -55.6 -58.2 62 -99 SPO 1997 04 21 11 48 66 5.7 -9 679.50 -58.4 -55.6 -58.2 62 -99 SPO 1997 04 21 11 49 66 5.8 -9 679.50 -58.3 -55.3 -58.2 62 -99 SPO 1997 04 21 11 50 66 5.8 -9 679.50 -58.3 -55.0 -58.2 62 -99 SPO 1997 04 21 11 51 67 5.9 -9 679.50 -58.2 -54.8 -58.2 62 -99 SPO 1997 04 21 11 52 66 5.9 -9 679.50 -58.2 -54.4 -58.1 62 -99 SPO 1997 04 21 11 53 65 6.0 -9 679.50 -58.1 -54.4 -58.1 62 -99 SPO 1997 04 21 11 54 64 5.9 -9 679.40 -58.0 -54.4 -58.1 61 -99 SPO 1997 04 21 11 55 63 6.1 -9 679.40 -58.0 -54.5 -58.0 61 -99 SPO 1997 04 21 11 56 62 6.1 -9 679.40 -57.9 -54.4 -58.0 60 -99 SPO 1997 04 21 11 57 61 6.3 -9 679.40 -57.8 -54.3 -57.9 60 -99 SPO 1997 04 21 11 58 62 6.0 -9 679.40 -57.7 -54.4 -57.8 59 -99 SPO 1997 04 21 11 59 62 6.0 -9 679.40 -57.6 -54.3 -57.7 59 -99 SPO 1997 04 21 12 00 61 6.2 -9 679.40 -57.5 -54.3 -57.6 59 0 SPO 1997 04 21 12 01 61 5.8 -9 679.40 -57.4 -54.5 -57.5 60 -99 SPO 1997 04 21 12 02 59 6.0 -9 679.40 -57.2 -54.6 -57.4 60 -99 SPO 1997 04 21 12 03 57 6.0 -9 679.40 -57.0 -54.7 -57.2 59 -99 SPO 1997 04 21 12 04 55 5.9 -9 679.40 -57.0 -54.7 -57.2 60 -99 SPO 1997 04 21 12 05 54 6.0 -9 679.40 -56.8 -54.6 -57.1 60 -99 SPO 1997 04 21 12 06 56 6.2 -9 679.40 -56.7 -54.5 -57.0 59 -99 SPO 1997 04 21 12 07 56 6.4 -9 679.40 -56.6 -54.3 -56.8 59 -99 SPO 1997 04 21 12 08 56 6.4 -9 679.40 -56.6 -54.4 -56.7 60 -99 SPO 1997 04 21 12 09 57 6.4 -9 679.40 -56.6 -54.2 -56.7 60 -99 SPO 1997 04 21 12 10 56 6.3 -9 679.30 -56.5 -54.4 -56.8 61 -99 SPO 1997 04 21 12 11 58 6.2 -9 679.30 -56.6 -54.4 -56.8 61 -99 SPO 1997 04 21 12 12 59 5.9 -9 679.30 -56.6 -54.5 -56.8 62 -99 SPO 1997 04 21 12 13 61 5.9 -9 679.30 -56.7 -54.7 -56.9 63 -99 SPO 1997 04 21 12 14 62 5.9 -9 679.30 -56.8 -54.5 -56.9 64 -99 SPO 1997 04 21 12 15 63 5.7 -9 679.30 -56.8 -54.4 -57.0 64 -99 SPO 1997 04 21 12 16 62 5.6 -9 679.30 -56.9 -54.6 -57.0 63 -99 SPO 1997 04 21 12 17 62 5.4 -9 679.30 -57.0 -54.7 -57.0 63 -99 SPO 1997 04 21 12 18 62 5.4 -9 679.30 -57.0 -54.6 -57.1 63 -99 SPO 1997 04 21 12 19 62 5.5 -9 679.30 -57.2 -54.6 -57.2 63 -99 SPO 1997 04 21 12 20 59 5.6 -9 679.30 -57.2 -54.8 -57.3 62 -99 SPO 1997 04 21 12 21 59 5.6 -9 679.30 -57.3 -54.8 -57.3 63 -99 SPO 1997 04 21 12 22 58 5.7 -9 679.30 -57.3 -54.9 -57.3 63 -99 SPO 1997 04 21 12 23 57 6.0 -9 679.30 -57.3 -54.8 -57.4 63 -99 SPO 1997 04 21 12 24 55 5.8 -9 679.30 -57.3 -54.6 -57.3 63 -99 SPO 1997 04 21 12 25 55 6.1 -9 679.20 -57.4 -54.3 -57.4 64 -99 SPO 1997 04 21 12 26 54 6.1 -9 679.20 -57.4 -54.1 -57.4 64 -99 SPO 1997 04 21 12 27 54 6.3 -9 679.20 -57.4 -54.0 -57.4 64 -99 SPO 1997 04 21 12 28 56 6.2 -9 679.20 -57.3 -53.9 -57.3 63 -99 SPO 1997 04 21 12 29 57 5.8 -9 679.20 -57.3 -54.0 -57.3 63 -99 SPO 1997 04 21 12 30 59 5.7 -9 679.20 -57.3 -54.2 -57.3 63 -99 SPO 1997 04 21 12 31 59 5.4 -9 679.10 -57.3 -54.3 -57.4 63 -99 SPO 1997 04 21 12 32 59 5.3 -9 679.10 -57.3 -54.4 -57.4 63 -99 SPO 1997 04 21 12 33 58 5.2 -9 679.20 -57.3 -54.5 -57.4 62 -99 SPO 1997 04 21 12 34 57 5.0 -9 679.10 -57.3 -54.7 -57.4 62 -99 SPO 1997 04 21 12 35 55 5.2 -9 679.10 -57.4 -54.4 -57.4 63 -99 SPO 1997 04 21 12 36 53 5.4 -9 679.10 -57.5 -54.2 -57.5 64 -99 SPO 1997 04 21 12 37 52 5.7 -9 679.10 -57.5 -54.0 -57.5 64 -99 SPO 1997 04 21 12 38 51 5.8 -9 679.10 -57.5 -53.9 -57.5 64 -99 SPO 1997 04 21 12 39 50 5.8 -9 679.10 -57.4 -54.0 -57.5 64 -99 SPO 1997 04 21 12 40 50 5.7 -9 679.10 -57.4 -54.0 -57.4 63 -99 SPO 1997 04 21 12 41 51 5.5 -9 679.00 -57.4 -54.1 -57.4 63 -99 SPO 1997 04 21 12 42 52 5.3 -9 679.00 -57.4 -54.2 -57.5 63 -99 SPO 1997 04 21 12 43 52 5.0 -9 679.00 -57.5 -54.2 -57.5 63 -99 SPO 1997 04 21 12 44 53 4.8 -9 679.00 -57.6 -54.3 -57.6 63 -99 SPO 1997 04 21 12 45 52 4.7 -9 679.00 -57.6 -54.2 -57.6 63 -99 SPO 1997 04 21 12 46 53 4.6 -9 679.00 -57.6 -54.1 -57.6 63 -99 SPO 1997 04 21 12 47 55 4.7 -9 679.00 -57.5 -54.0 -57.5 63 -99 SPO 1997 04 21 12 48 59 4.9 -9 679.00 -57.4 -53.8 -57.4 63 -99 SPO 1997 04 21 12 49 57 5.4 -9 678.90 -57.1 -53.6 -57.2 61 -99 SPO 1997 04 21 12 50 61 5.0 -9 678.90 -57.0 -53.8 -57.1 62 -99 SPO 1997 04 21 12 51 60 4.5 -9 678.90 -57.0 -54.0 -57.2 62 -99 SPO 1997 04 21 12 52 61 4.3 -9 678.90 -57.0 -54.2 -57.1 62 -99 SPO 1997 04 21 12 53 62 4.3 -9 678.90 -57.0 -54.1 -57.1 62 -99 SPO 1997 04 21 12 54 63 4.4 -9 678.90 -57.0 -54.1 -57.2 62 -99 SPO 1997 04 21 12 55 63 4.3 -9 678.90 -57.0 -54.3 -57.2 62 -99 SPO 1997 04 21 12 56 61 4.3 -9 678.90 -56.9 -54.4 -57.1 61 -99 SPO 1997 04 21 12 57 63 4.5 -9 678.90 -56.9 -54.2 -57.1 61 -99 SPO 1997 04 21 12 58 62 4.5 -9 678.90 -56.9 -54.2 -57.1 62 -99 SPO 1997 04 21 12 59 62 4.4 -9 678.80 -56.9 -54.2 -57.0 63 -99 SPO 1997 04 21 13 00 61 4.9 -9 678.80 -56.9 -53.9 -57.0 63 0 SPO 1997 04 21 13 01 60 5.3 -9 678.80 -56.8 -53.6 -57.0 62 -99 SPO 1997 04 21 13 02 60 5.0 -9 678.80 -56.6 -53.5 -56.8 61 -99 SPO 1997 04 21 13 03 60 4.8 -9 678.80 -56.5 -53.8 -56.7 61 -99 SPO 1997 04 21 13 04 67 4.7 -9 678.80 -56.4 -54.1 -56.6 61 -99 SPO 1997 04 21 13 05 67 4.9 -9 678.80 -56.4 -54.0 -56.6 61 -99 SPO 1997 04 21 13 06 70 5.0 -9 678.70 -56.4 -53.9 -56.6 61 -99 SPO 1997 04 21 13 07 71 4.8 -9 678.70 -56.5 -53.9 -56.6 61 -99 SPO 1997 04 21 13 08 70 4.9 -9 678.70 -56.5 -54.0 -56.7 63 -99 SPO 1997 04 21 13 09 70 5.2 -9 678.70 -56.5 -54.0 -56.7 63 -99 SPO 1997 04 21 13 10 70 5.2 -9 678.60 -56.5 -53.9 -56.6 63 -99 SPO 1997 04 21 13 11 69 4.8 -9 678.60 -56.5 -54.0 -56.6 63 -99 SPO 1997 04 21 13 12 66 4.0 -9 678.70 -56.5 -54.4 -56.6 64 -99 SPO 1997 04 21 13 13 54 3.6 -9 678.70 -56.6 -54.7 -56.6 64 -99 SPO 1997 04 21 13 14 40 6.6 -9 678.70 -56.0 -53.4 -56.1 60 -99 SPO 1997 04 21 13 15 42 7.0 -9 678.60 -54.3 -52.6 -54.6 51 -99 SPO 1997 04 21 13 16 42 7.7 -9 678.60 -53.9 -52.4 -54.2 53 -99 SPO 1997 04 21 13 17 42 8.0 -9 678.50 -53.7 -52.0 -54.0 56 -99 SPO 1997 04 21 13 18 40 7.1 -9 678.50 -53.7 -52.1 -54.0 58 -99 SPO 1997 04 21 13 19 39 7.9 -9 678.40 -53.6 -52.1 -54.0 58 -99 SPO 1997 04 21 13 20 41 8.1 -9 678.40 -53.5 -52.0 -53.8 60 -99 SPO 1997 04 21 13 21 41 8.2 -9 678.40 -53.5 -51.9 -53.8 61 -99 SPO 1997 04 21 13 22 42 8.1 -9 678.40 -53.5 -51.8 -53.8 63 -99 SPO 1997 04 21 13 23 41 7.9 -9 678.40 -53.5 -51.8 -53.8 63 -99 SPO 1997 04 21 13 24 42 7.6 -9 678.40 -53.6 -51.9 -53.8 64 -99 SPO 1997 04 21 13 25 41 7.6 -9 678.40 -53.6 -52.0 -53.8 64 -99 SPO 1997 04 21 13 26 42 7.4 -9 678.40 -53.6 -52.1 -53.8 64 -99 SPO 1997 04 21 13 27 42 7.1 -9 678.40 -53.7 -52.2 -53.9 64 -99 SPO 1997 04 21 13 28 44 7.2 -9 678.40 -53.7 -52.3 -53.9 64 -99 SPO 1997 04 21 13 29 47 7.2 -9 678.30 -53.7 -52.2 -53.9 64 -99 SPO 1997 04 21 13 30 47 6.7 -9 678.40 -53.7 -52.3 -53.8 64 -99 SPO 1997 04 21 13 31 45 6.8 -9 678.40 -53.8 -52.5 -54.0 64 -99 SPO 1997 04 21 13 32 49 6.7 -9 678.40 -53.8 -52.4 -53.9 64 -99 SPO 1997 04 21 13 33 46 6.4 -9 678.40 -53.9 -52.5 -54.0 66 -99 SPO 1997 04 21 13 34 47 6.0 -9 678.40 -53.8 -52.6 -54.0 65 -99 SPO 1997 04 21 13 35 46 6.2 -9 678.40 -53.9 -52.6 -54.0 66 -99 SPO 1997 04 21 13 36 43 5.8 -9 678.40 -53.9 -52.6 -54.0 66 -99 SPO 1997 04 21 13 37 42 6.2 -9 678.40 -53.9 -52.6 -54.0 65 -99 SPO 1997 04 21 13 38 45 6.5 -9 678.40 -53.8 -52.5 -53.9 64 -99 SPO 1997 04 21 13 39 45 6.5 -9 678.30 -53.8 -52.4 -53.9 64 -99 SPO 1997 04 21 13 40 43 6.3 -9 678.30 -53.9 -52.4 -53.9 64 -99 SPO 1997 04 21 13 41 43 6.1 -9 678.30 -53.8 -52.5 -53.9 64 -99 SPO 1997 04 21 13 42 39 6.0 -9 678.30 -53.9 -52.7 -54.0 64 -99 SPO 1997 04 21 13 43 45 6.4 -9 678.20 -53.9 -52.6 -53.9 65 -99 SPO 1997 04 21 13 44 44 6.3 -9 678.20 -53.9 -52.5 -53.9 65 -99 SPO 1997 04 21 13 45 42 6.3 -9 678.20 -53.9 -52.7 -54.0 66 -99 SPO 1997 04 21 13 46 45 6.5 -9 678.20 -54.0 -52.6 -54.0 67 -99 SPO 1997 04 21 13 47 44 6.5 -9 678.10 -54.0 -52.6 -54.0 67 -99 SPO 1997 04 21 13 48 44 6.5 -9 678.10 -54.0 -52.7 -54.1 67 -99 SPO 1997 04 21 13 49 44 6.7 -9 678.10 -54.1 -52.7 -54.1 67 -99 SPO 1997 04 21 13 50 44 6.7 -9 678.10 -54.1 -52.7 -54.1 66 -99 SPO 1997 04 21 13 51 42 6.5 -9 678.00 -54.2 -52.8 -54.2 66 -99 SPO 1997 04 21 13 52 40 6.6 -9 678.00 -54.2 -52.8 -54.2 65 -99 SPO 1997 04 21 13 53 40 7.1 -9 678.00 -54.1 -52.7 -54.1 64 -99 SPO 1997 04 21 13 54 39 7.3 -9 678.00 -54.0 -52.5 -54.1 64 -99 SPO 1997 04 21 13 55 38 7.3 -9 678.00 -54.0 -52.5 -54.0 65 -99 SPO 1997 04 21 13 56 39 7.3 -9 678.00 -54.0 -52.4 -54.0 65 -99 SPO 1997 04 21 13 57 35 7.2 -9 678.00 -53.9 -52.4 -54.0 64 -99 SPO 1997 04 21 13 58 36 7.2 -9 678.00 -53.8 -52.6 -53.9 64 -99 SPO 1997 04 21 13 59 37 7.4 -9 678.00 -53.8 -52.5 -53.8 65 -99 SPO 1997 04 21 14 00 37 7.3 -9 678.00 -53.7 -52.5 -53.8 64 0 SPO 1997 04 21 14 01 38 7.2 -9 678.00 -53.7 -52.6 -53.8 64 -99 SPO 1997 04 21 14 02 38 7.4 -9 678.00 -53.6 -52.5 -53.7 64 -99 SPO 1997 04 21 14 03 37 7.0 -9 677.90 -53.6 -52.5 -53.7 64 -99 SPO 1997 04 21 14 04 37 7.0 -9 678.00 -53.6 -52.6 -53.6 64 -99 SPO 1997 04 21 14 05 36 7.4 -9 678.00 -53.5 -52.4 -53.6 64 -99 SPO 1997 04 21 14 06 32 7.2 -9 678.00 -53.4 -52.5 -53.5 64 -99 SPO 1997 04 21 14 07 34 7.0 -9 678.00 -53.3 -52.5 -53.4 64 -99 SPO 1997 04 21 14 08 34 7.0 -9 678.00 -53.2 -52.4 -53.4 64 -99 SPO 1997 04 21 14 09 34 7.7 -9 677.90 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 14 10 36 7.4 -9 677.90 -53.0 -52.2 -53.1 64 -99 SPO 1997 04 21 14 11 35 7.7 -9 677.90 -53.0 -52.1 -53.1 65 -99 SPO 1997 04 21 14 12 36 7.9 -9 677.90 -52.9 -52.1 -53.0 65 -99 SPO 1997 04 21 14 13 34 7.9 -9 677.90 -52.8 -52.0 -53.0 64 -99 SPO 1997 04 21 14 14 33 7.8 -9 677.90 -52.8 -52.0 -52.9 64 -99 SPO 1997 04 21 14 15 32 7.5 -9 678.00 -52.7 -52.1 -52.9 63 -99 SPO 1997 04 21 14 16 32 7.6 -9 678.00 -52.8 -52.1 -52.9 64 -99 SPO 1997 04 21 14 17 31 7.8 -9 678.00 -52.7 -52.1 -52.8 65 -99 SPO 1997 04 21 14 18 30 7.0 -9 678.00 -52.7 -52.0 -52.8 66 -99 SPO 1997 04 21 14 19 31 7.6 -9 678.00 -52.7 -52.0 -52.8 66 -99 SPO 1997 04 21 14 20 31 7.6 -9 678.00 -52.6 -51.9 -52.7 66 -99 SPO 1997 04 21 14 21 30 7.6 -9 678.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 21 14 22 31 7.2 -9 678.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 21 14 23 32 6.9 -9 678.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 21 14 24 30 7.0 -9 678.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 21 14 25 32 6.6 -9 678.10 -52.5 -51.9 -52.6 65 -99 SPO 1997 04 21 14 26 34 6.5 -9 678.10 -52.5 -51.9 -52.6 65 -99 SPO 1997 04 21 14 27 33 6.6 -9 678.10 -52.4 -51.9 -52.6 65 -99 SPO 1997 04 21 14 28 33 6.1 -9 678.10 -52.4 -51.9 -52.5 65 -99 SPO 1997 04 21 14 29 32 5.9 -9 678.10 -52.5 -51.9 -52.6 67 -99 SPO 1997 04 21 14 30 32 6.1 -9 678.10 -52.5 -51.9 -52.6 67 -99 SPO 1997 04 21 14 31 34 5.9 -9 678.10 -52.4 -52.0 -52.6 66 -99 SPO 1997 04 21 14 32 33 6.2 -9 678.10 -52.5 -52.0 -52.6 68 -99 SPO 1997 04 21 14 33 32 6.0 -9 678.10 -52.5 -52.0 -52.5 68 -99 SPO 1997 04 21 14 34 33 5.7 -9 678.10 -52.6 -52.0 -52.6 69 -99 SPO 1997 04 21 14 35 32 5.6 -9 678.10 -52.6 -52.1 -52.7 68 -99 SPO 1997 04 21 14 36 33 5.6 -9 678.10 -52.7 -52.1 -52.7 68 -99 SPO 1997 04 21 14 37 34 5.5 -9 678.10 -52.7 -52.2 -52.7 67 -99 SPO 1997 04 21 14 38 33 5.5 -9 678.10 -52.7 -52.2 -52.7 66 -99 SPO 1997 04 21 14 39 34 5.3 -9 678.10 -52.8 -52.2 -52.8 67 -99 SPO 1997 04 21 14 40 35 5.4 -9 678.10 -52.8 -52.2 -52.8 67 -99 SPO 1997 04 21 14 41 35 5.6 -9 678.00 -52.9 -52.2 -52.9 68 -99 SPO 1997 04 21 14 42 35 5.6 -9 678.00 -52.9 -52.2 -52.9 67 -99 SPO 1997 04 21 14 43 36 5.8 -9 678.00 -52.9 -52.2 -52.9 67 -99 SPO 1997 04 21 14 44 36 5.8 -9 678.00 -53.0 -52.2 -53.0 68 -99 SPO 1997 04 21 14 45 36 6.0 -9 678.00 -53.0 -52.2 -53.0 68 -99 SPO 1997 04 21 14 46 36 6.0 -9 677.90 -53.0 -52.2 -53.0 67 -99 SPO 1997 04 21 14 47 36 6.0 -9 677.90 -53.0 -52.2 -53.0 66 -99 SPO 1997 04 21 14 48 35 6.2 -9 677.90 -53.0 -52.2 -53.0 65 -99 SPO 1997 04 21 14 49 35 6.5 -9 677.90 -53.0 -52.2 -53.0 64 -99 SPO 1997 04 21 14 50 35 6.3 -9 677.90 -53.0 -52.2 -53.0 64 -99 SPO 1997 04 21 14 51 35 6.3 -9 677.80 -52.9 -52.2 -53.0 65 -99 SPO 1997 04 21 14 52 35 6.3 -9 677.80 -53.0 -52.1 -53.0 67 -99 SPO 1997 04 21 14 53 35 6.2 -9 677.80 -53.0 -52.1 -53.0 68 -99 SPO 1997 04 21 14 54 36 6.3 -9 677.80 -52.9 -52.1 -53.0 67 -99 SPO 1997 04 21 14 55 36 6.4 -9 677.80 -52.9 -52.1 -52.9 67 -99 SPO 1997 04 21 14 56 36 6.5 -9 677.80 -52.9 -52.0 -52.9 68 -99 SPO 1997 04 21 14 57 37 6.1 -9 677.80 -52.8 -52.1 -52.9 67 -99 SPO 1997 04 21 14 58 37 6.2 -9 677.80 -52.9 -52.0 -53.0 67 -99 SPO 1997 04 21 14 59 38 6.3 -9 677.80 -52.9 -52.0 -53.0 66 -99 SPO 1997 04 21 15 00 39 6.4 -9 677.80 -52.9 -52.0 -52.9 65 0 SPO 1997 04 21 15 01 39 6.5 -9 677.70 -52.9 -52.0 -53.0 65 -99 SPO 1997 04 21 15 02 40 6.4 -9 677.70 -52.9 -52.0 -53.0 65 -99 SPO 1997 04 21 15 03 40 6.5 -9 677.70 -53.0 -52.0 -53.0 66 -99 SPO 1997 04 21 15 04 40 6.6 -9 677.70 -53.0 -52.0 -53.0 67 -99 SPO 1997 04 21 15 05 40 6.3 -9 677.70 -52.9 -52.0 -53.0 66 -99 SPO 1997 04 21 15 06 40 6.7 -9 677.70 -52.9 -52.0 -52.9 66 -99 SPO 1997 04 21 15 07 41 6.4 -9 677.60 -52.9 -52.0 -53.0 67 -99 SPO 1997 04 21 15 08 42 6.4 -9 677.60 -53.0 -52.1 -53.0 68 -99 SPO 1997 04 21 15 09 42 6.5 -9 677.60 -53.0 -52.1 -53.0 68 -99 SPO 1997 04 21 15 10 42 6.2 -9 677.60 -53.0 -52.1 -53.0 67 -99 SPO 1997 04 21 15 11 42 6.3 -9 677.60 -53.0 -52.2 -53.1 66 -99 SPO 1997 04 21 15 12 43 6.4 -9 677.60 -53.0 -52.1 -53.1 65 -99 SPO 1997 04 21 15 13 44 6.4 -9 677.60 -53.0 -52.1 -53.1 65 -99 SPO 1997 04 21 15 14 45 6.3 -9 677.60 -53.1 -52.1 -53.1 66 -99 SPO 1997 04 21 15 15 45 6.2 -9 677.60 -53.0 -52.1 -53.1 65 -99 SPO 1997 04 21 15 16 44 6.2 -9 677.60 -53.0 -52.1 -53.1 66 -99 SPO 1997 04 21 15 17 43 6.2 -9 677.50 -53.0 -52.1 -53.0 66 -99 SPO 1997 04 21 15 18 44 6.2 -9 677.50 -53.0 -52.0 -53.0 67 -99 SPO 1997 04 21 15 19 44 6.2 -9 677.50 -53.0 -52.1 -53.0 67 -99 SPO 1997 04 21 15 20 43 6.3 -9 677.50 -52.9 -52.1 -53.0 66 -99 SPO 1997 04 21 15 21 44 6.2 -9 677.50 -52.9 -52.0 -53.0 66 -99 SPO 1997 04 21 15 22 44 6.3 -9 677.50 -52.9 -52.1 -53.0 65 -99 SPO 1997 04 21 15 23 43 6.5 -9 677.50 -52.9 -52.1 -53.0 65 -99 SPO 1997 04 21 15 24 42 6.3 -9 677.50 -52.9 -52.1 -52.9 65 -99 SPO 1997 04 21 15 25 41 6.4 -9 677.50 -52.9 -52.1 -52.9 65 -99 SPO 1997 04 21 15 26 41 6.4 -9 677.50 -52.8 -52.1 -52.9 65 -99 SPO 1997 04 21 15 27 42 6.5 -9 677.50 -52.8 -52.0 -52.9 65 -99 SPO 1997 04 21 15 28 42 6.3 -9 677.50 -52.8 -52.0 -52.9 65 -99 SPO 1997 04 21 15 29 42 6.2 -9 677.50 -52.8 -52.0 -52.8 65 -99 SPO 1997 04 21 15 30 41 6.2 -9 677.50 -52.8 -52.0 -52.8 66 -99 SPO 1997 04 21 15 31 41 6.2 -9 677.50 -52.8 -52.1 -52.8 66 -99 SPO 1997 04 21 15 32 41 6.2 -9 677.40 -52.7 -52.0 -52.8 65 -99 SPO 1997 04 21 15 33 41 6.1 -9 677.40 -52.6 -52.0 -52.7 64 -99 SPO 1997 04 21 15 34 41 6.3 -9 677.40 -52.6 -51.9 -52.7 64 -99 SPO 1997 04 21 15 35 41 6.3 -9 677.40 -52.6 -51.9 -52.7 64 -99 SPO 1997 04 21 15 36 41 6.3 -9 677.40 -52.6 -51.9 -52.7 64 -99 SPO 1997 04 21 15 37 40 6.2 -9 677.30 -52.6 -51.9 -52.7 64 -99 SPO 1997 04 21 15 38 40 6.2 -9 677.30 -52.7 -51.9 -52.8 66 -99 SPO 1997 04 21 15 39 40 6.1 -9 677.30 -52.7 -51.9 -52.7 66 -99 SPO 1997 04 21 15 40 38 6.1 -9 677.30 -52.7 -51.9 -52.8 65 -99 SPO 1997 04 21 15 41 38 6.0 -9 677.30 -52.7 -51.9 -52.8 65 -99 SPO 1997 04 21 15 42 37 6.2 -9 677.30 -52.8 -51.9 -52.8 65 -99 SPO 1997 04 21 15 43 37 6.2 -9 677.30 -52.7 -51.9 -52.8 65 -99 SPO 1997 04 21 15 44 37 6.3 -9 677.30 -52.7 -51.9 -52.7 65 -99 SPO 1997 04 21 15 45 37 6.2 -9 677.30 -52.7 -51.9 -52.7 65 -99 SPO 1997 04 21 15 46 37 6.3 -9 677.30 -52.7 -51.9 -52.8 65 -99 SPO 1997 04 21 15 47 35 6.3 -9 677.30 -52.7 -51.9 -52.8 65 -99 SPO 1997 04 21 15 48 35 6.4 -9 677.30 -52.7 -51.9 -52.8 64 -99 SPO 1997 04 21 15 49 35 6.7 -9 677.30 -52.7 -51.8 -52.7 65 -99 SPO 1997 04 21 15 50 35 6.7 -9 677.30 -52.6 -51.8 -52.7 65 -99 SPO 1997 04 21 15 51 33 6.6 -9 677.30 -52.6 -51.8 -52.7 65 -99 SPO 1997 04 21 15 52 33 6.8 -9 677.30 -52.6 -51.8 -52.7 65 -99 SPO 1997 04 21 15 53 34 6.5 -9 677.30 -52.7 -51.8 -52.7 67 -99 SPO 1997 04 21 15 54 35 6.6 -9 677.30 -52.7 -51.8 -52.7 66 -99 SPO 1997 04 21 15 55 35 6.3 -9 677.30 -52.7 -51.9 -52.8 66 -99 SPO 1997 04 21 15 56 35 6.2 -9 677.30 -52.8 -51.9 -52.9 65 -99 SPO 1997 04 21 15 57 36 6.2 -9 677.30 -52.9 -52.0 -52.9 65 -99 SPO 1997 04 21 15 58 34 6.2 -9 677.30 -52.9 -52.0 -52.9 65 -99 SPO 1997 04 21 15 59 34 6.0 -9 677.30 -52.9 -52.1 -52.9 64 -99 SPO 1997 04 21 16 00 35 6.1 -9 677.20 -52.9 -52.1 -52.9 65 0 SPO 1997 04 21 16 01 36 5.9 -9 677.20 -52.9 -52.1 -53.0 65 -99 SPO 1997 04 21 16 02 35 6.2 -9 677.20 -52.9 -52.1 -53.0 65 -99 SPO 1997 04 21 16 03 34 6.3 -9 677.20 -52.9 -52.1 -52.9 65 -99 SPO 1997 04 21 16 04 35 6.1 -9 677.20 -52.9 -52.1 -52.9 65 -99 SPO 1997 04 21 16 05 35 6.1 -9 677.20 -53.0 -52.2 -53.0 66 -99 SPO 1997 04 21 16 06 34 6.3 -9 677.20 -52.9 -52.1 -53.0 66 -99 SPO 1997 04 21 16 07 34 6.5 -9 677.10 -52.9 -52.1 -52.9 66 -99 SPO 1997 04 21 16 08 34 6.3 -9 677.10 -52.8 -52.1 -52.9 65 -99 SPO 1997 04 21 16 09 35 6.0 -9 677.10 -52.9 -52.0 -52.9 65 -99 SPO 1997 04 21 16 10 35 6.1 -9 677.10 -52.9 -52.1 -52.9 65 -99 SPO 1997 04 21 16 11 36 6.0 -9 677.10 -52.9 -52.0 -53.0 65 -99 SPO 1997 04 21 16 12 36 6.0 -9 677.10 -52.8 -52.0 -52.9 65 -99 SPO 1997 04 21 16 13 36 5.9 -9 677.10 -52.9 -52.1 -52.9 66 -99 SPO 1997 04 21 16 14 37 6.1 -9 677.20 -52.8 -52.1 -52.9 65 -99 SPO 1997 04 21 16 15 37 5.8 -9 677.20 -52.8 -52.1 -52.9 65 -99 SPO 1997 04 21 16 16 38 5.4 -9 677.20 -52.8 -52.2 -52.8 65 -99 SPO 1997 04 21 16 17 38 5.6 -9 677.20 -52.8 -52.2 -52.9 65 -99 SPO 1997 04 21 16 18 39 5.3 -9 677.20 -52.8 -52.2 -52.9 65 -99 SPO 1997 04 21 16 19 39 5.3 -9 677.20 -52.9 -52.3 -52.9 66 -99 SPO 1997 04 21 16 20 38 5.3 -9 677.20 -52.9 -52.3 -53.0 66 -99 SPO 1997 04 21 16 21 38 5.3 -9 677.20 -52.9 -52.3 -53.0 65 -99 SPO 1997 04 21 16 22 38 5.3 -9 677.20 -52.9 -52.3 -52.9 65 -99 SPO 1997 04 21 16 23 38 5.0 -9 677.20 -52.9 -52.3 -53.0 65 -99 SPO 1997 04 21 16 24 38 5.2 -9 677.20 -53.0 -52.3 -53.0 66 -99 SPO 1997 04 21 16 25 38 5.2 -9 677.20 -52.9 -52.3 -52.9 66 -99 SPO 1997 04 21 16 26 38 5.7 -9 677.20 -52.8 -52.2 -52.9 65 -99 SPO 1997 04 21 16 27 39 5.5 -9 677.20 -52.7 -52.2 -52.8 65 -99 SPO 1997 04 21 16 28 37 5.7 -9 677.20 -52.8 -52.2 -52.9 66 -99 SPO 1997 04 21 16 29 37 5.6 -9 677.20 -52.8 -52.2 -52.9 66 -99 SPO 1997 04 21 16 30 38 5.7 -9 677.20 -52.8 -52.2 -52.9 65 -99 SPO 1997 04 21 16 31 39 5.3 -9 677.20 -52.8 -52.2 -52.9 65 -99 SPO 1997 04 21 16 32 40 5.5 -9 677.20 -52.9 -52.3 -52.9 65 -99 SPO 1997 04 21 16 33 41 5.4 -9 677.10 -53.0 -52.3 -53.0 64 -99 SPO 1997 04 21 16 34 41 5.6 -9 677.10 -53.0 -52.4 -53.0 64 -99 SPO 1997 04 21 16 35 41 5.5 -9 677.10 -53.1 -52.4 -53.1 66 -99 SPO 1997 04 21 16 36 39 5.8 -9 677.10 -53.0 -52.3 -53.0 66 -99 SPO 1997 04 21 16 37 40 5.7 -9 677.10 -53.0 -52.4 -53.0 66 -99 SPO 1997 04 21 16 38 39 5.7 -9 677.10 -53.1 -52.4 -53.1 67 -99 SPO 1997 04 21 16 39 40 5.9 -9 677.00 -53.1 -52.4 -53.1 67 -99 SPO 1997 04 21 16 40 40 5.5 -9 677.00 -53.2 -52.4 -53.2 68 -99 SPO 1997 04 21 16 41 39 5.6 -9 677.00 -53.2 -52.4 -53.2 67 -99 SPO 1997 04 21 16 42 38 5.9 -9 677.00 -53.3 -52.4 -53.3 66 -99 SPO 1997 04 21 16 43 36 6.0 -9 677.00 -53.2 -52.4 -53.2 64 -99 SPO 1997 04 21 16 44 36 6.1 -9 677.00 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 45 36 6.2 -9 677.00 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 46 36 6.3 -9 677.00 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 47 36 6.2 -9 676.90 -53.2 -52.3 -53.3 64 -99 SPO 1997 04 21 16 48 35 6.3 -9 676.90 -53.2 -52.3 -53.3 64 -99 SPO 1997 04 21 16 49 35 6.4 -9 676.90 -53.2 -52.3 -53.3 64 -99 SPO 1997 04 21 16 50 33 6.5 -9 676.90 -53.2 -52.3 -53.3 64 -99 SPO 1997 04 21 16 51 32 6.4 -9 676.90 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 52 32 6.7 -9 676.90 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 53 31 6.7 -9 676.90 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 54 32 6.9 -9 676.90 -53.1 -52.3 -53.1 64 -99 SPO 1997 04 21 16 55 32 6.9 -9 676.90 -53.2 -52.3 -53.2 64 -99 SPO 1997 04 21 16 56 32 6.9 -9 676.90 -53.2 -52.4 -53.3 64 -99 SPO 1997 04 21 16 57 33 7.1 -9 676.90 -53.2 -52.3 -53.3 63 -99 SPO 1997 04 21 16 58 33 7.2 -9 676.90 -53.3 -52.3 -53.3 64 -99 SPO 1997 04 21 16 59 33 7.0 -9 676.90 -53.3 -52.3 -53.4 64 -99 SPO 1997 04 21 17 00 33 6.8 -9 676.90 -53.4 -52.3 -53.4 65 0 SPO 1997 04 21 17 01 33 7.0 -9 676.90 -53.4 -52.2 -53.4 65 -99 SPO 1997 04 21 17 02 33 7.1 -9 676.90 -53.4 -52.2 -53.4 65 -99 SPO 1997 04 21 17 03 33 7.0 -9 676.90 -53.4 -52.2 -53.4 65 -99 SPO 1997 04 21 17 04 34 6.9 -9 676.90 -53.4 -52.3 -53.5 64 -99 SPO 1997 04 21 17 05 34 6.7 -9 676.90 -53.5 -52.3 -53.5 65 -99 SPO 1997 04 21 17 06 34 6.6 -9 676.90 -53.6 -52.3 -53.6 65 -99 SPO 1997 04 21 17 07 34 6.7 -9 676.80 -53.6 -52.3 -53.6 64 -99 SPO 1997 04 21 17 08 34 6.6 -9 676.80 -53.6 -52.4 -53.6 64 -99 SPO 1997 04 21 17 09 34 6.5 -9 676.80 -53.6 -52.4 -53.6 64 -99 SPO 1997 04 21 17 10 34 6.4 -9 676.80 -53.7 -52.4 -53.7 64 -99 SPO 1997 04 21 17 11 34 6.6 -9 676.80 -53.6 -52.5 -53.6 64 -99 SPO 1997 04 21 17 12 34 6.5 -9 676.80 -53.6 -52.4 -53.6 64 -99 SPO 1997 04 21 17 13 33 6.4 -9 676.80 -53.6 -52.4 -53.6 64 -99 SPO 1997 04 21 17 14 34 6.4 -9 676.80 -53.6 -52.4 -53.6 65 -99 SPO 1997 04 21 17 15 34 6.6 -9 676.80 -53.6 -52.4 -53.6 65 -99 SPO 1997 04 21 17 16 35 6.5 -9 676.80 -53.5 -52.4 -53.6 64 -99 SPO 1997 04 21 17 17 36 6.4 -9 676.80 -53.6 -52.5 -53.7 65 -99 SPO 1997 04 21 17 18 38 6.4 -9 676.80 -53.7 -52.4 -53.7 65 -99 SPO 1997 04 21 17 19 39 6.0 -9 676.80 -53.8 -52.5 -53.8 65 -99 SPO 1997 04 21 17 20 40 6.0 -9 676.80 -53.9 -52.6 -53.9 66 -99 SPO 1997 04 21 17 21 41 6.1 -9 676.80 -53.9 -52.6 -53.9 66 -99 SPO 1997 04 21 17 22 41 5.9 -9 676.80 -53.8 -52.6 -53.9 65 -99 SPO 1997 04 21 17 23 43 5.7 -9 676.80 -53.9 -52.6 -53.9 66 -99 SPO 1997 04 21 17 24 42 5.7 -9 676.80 -53.9 -52.6 -53.9 66 -99 SPO 1997 04 21 17 25 44 5.5 -9 676.80 -53.9 -52.7 -53.9 66 -99 SPO 1997 04 21 17 26 46 5.2 -9 676.90 -53.9 -52.8 -53.9 66 -99 SPO 1997 04 21 17 27 49 5.0 -9 676.90 -53.9 -52.9 -54.0 66 -99 SPO 1997 04 21 17 28 48 4.9 -9 676.90 -54.0 -52.9 -54.0 65 -99 SPO 1997 04 21 17 29 48 4.9 -9 676.90 -54.0 -52.9 -54.0 65 -99 SPO 1997 04 21 17 30 48 4.8 -9 676.80 -54.1 -53.0 -54.1 64 -99 SPO 1997 04 21 17 31 48 5.0 -9 676.80 -54.1 -52.9 -54.2 63 -99 SPO 1997 04 21 17 32 47 5.1 -9 676.80 -54.1 -52.9 -54.1 62 -99 SPO 1997 04 21 17 33 47 5.5 -9 676.80 -54.1 -52.9 -54.1 63 -99 SPO 1997 04 21 17 34 46 5.3 -9 676.80 -54.0 -52.8 -54.1 63 -99 SPO 1997 04 21 17 35 45 5.1 -9 676.80 -54.1 -52.9 -54.2 65 -99 SPO 1997 04 21 17 36 45 5.3 -9 676.70 -54.1 -52.9 -54.1 65 -99 SPO 1997 04 21 17 37 44 5.3 -9 676.70 -54.1 -52.8 -54.1 65 -99 SPO 1997 04 21 17 38 43 5.3 -9 676.70 -54.2 -52.8 -54.2 67 -99 SPO 1997 04 21 17 39 43 5.4 -9 676.70 -54.2 -52.8 -54.2 67 -99 SPO 1997 04 21 17 40 43 5.5 -9 676.70 -54.2 -52.8 -54.2 66 -99 SPO 1997 04 21 17 41 42 5.5 -9 676.70 -54.1 -52.7 -54.2 64 -99 SPO 1997 04 21 17 42 42 5.5 -9 676.70 -54.1 -52.8 -54.2 62 -99 SPO 1997 04 21 17 43 41 5.6 -9 676.70 -54.2 -52.8 -54.2 63 -99 SPO 1997 04 21 17 44 41 5.7 -9 676.70 -54.2 -52.8 -54.2 64 -99 SPO 1997 04 21 17 45 40 5.8 -9 676.70 -54.1 -52.8 -54.2 63 -99 SPO 1997 04 21 17 46 40 5.9 -9 676.70 -54.1 -52.8 -54.2 64 -99 SPO 1997 04 21 17 47 38 6.0 -9 676.70 -54.1 -52.7 -54.1 65 -99 SPO 1997 04 21 17 48 36 5.8 -9 676.70 -54.0 -52.7 -54.1 64 -99 SPO 1997 04 21 17 49 37 5.8 -9 676.70 -54.1 -52.7 -54.1 64 -99 SPO 1997 04 21 17 50 37 5.8 -9 676.70 -54.1 -52.7 -54.1 63 -99 SPO 1997 04 21 17 51 37 5.9 -9 676.70 -54.1 -52.7 -54.2 62 -99 SPO 1997 04 21 17 52 38 5.8 -9 676.70 -54.1 -52.6 -54.2 62 -99 SPO 1997 04 21 17 53 38 5.7 -9 676.70 -54.1 -52.7 -54.1 62 -99 SPO 1997 04 21 17 54 38 5.5 -9 676.70 -54.1 -52.7 -54.1 61 -99 SPO 1997 04 21 17 55 39 5.5 -9 676.70 -54.1 -52.7 -54.2 61 -99 SPO 1997 04 21 17 56 37 5.5 -9 676.70 -54.2 -52.8 -54.2 63 -99 SPO 1997 04 21 17 57 38 5.6 -9 676.70 -54.2 -52.7 -54.3 64 -99 SPO 1997 04 21 17 58 39 5.7 -9 676.70 -54.2 -52.7 -54.3 64 -99 SPO 1997 04 21 17 59 37 5.8 -9 676.70 -54.2 -52.7 -54.3 63 -99 SPO 1997 04 21 18 00 36 5.8 -9 676.70 -54.2 -52.8 -54.2 63 0 SPO 1997 04 21 18 01 35 6.0 -9 676.60 -54.2 -52.8 -54.2 63 -99 SPO 1997 04 21 18 02 35 5.8 -9 676.60 -54.2 -52.8 -54.2 64 -99 SPO 1997 04 21 18 03 34 6.1 -9 676.60 -54.2 -52.8 -54.2 63 -99 SPO 1997 04 21 18 04 35 6.2 -9 676.60 -54.1 -52.8 -54.2 61 -99 SPO 1997 04 21 18 05 36 5.9 -9 676.60 -54.2 -52.8 -54.2 62 -99 SPO 1997 04 21 18 06 36 5.9 -9 676.60 -54.3 -52.8 -54.3 62 -99 SPO 1997 04 21 18 07 36 5.9 -9 676.60 -54.3 -52.8 -54.3 62 -99 SPO 1997 04 21 18 08 36 6.0 -9 676.60 -54.4 -52.8 -54.4 63 -99 SPO 1997 04 21 18 09 34 6.0 -9 676.60 -54.4 -52.7 -54.4 63 -99 SPO 1997 04 21 18 10 33 6.2 -9 676.60 -54.4 -52.7 -54.4 63 -99 SPO 1997 04 21 18 11 33 6.1 -9 676.60 -54.3 -52.7 -54.3 63 -99 SPO 1997 04 21 18 12 31 6.3 -9 676.50 -54.3 -52.7 -54.3 63 -99 SPO 1997 04 21 18 13 31 6.2 -9 676.50 -54.3 -52.7 -54.3 63 -99 SPO 1997 04 21 18 14 31 6.2 -9 676.50 -54.3 -52.7 -54.3 63 -99 SPO 1997 04 21 18 15 32 6.2 -9 676.50 -54.2 -52.7 -54.3 62 -99 SPO 1997 04 21 18 16 32 6.1 -9 676.50 -54.2 -52.7 -54.3 61 -99 SPO 1997 04 21 18 17 31 6.4 -9 676.50 -54.2 -52.7 -54.3 60 -99 SPO 1997 04 21 18 18 31 6.5 -9 676.50 -54.2 -52.7 -54.3 61 -99 SPO 1997 04 21 18 19 30 6.5 -9 676.50 -54.2 -52.8 -54.3 62 -99 SPO 1997 04 21 18 20 30 6.4 -9 676.50 -54.3 -52.8 -54.3 63 -99 SPO 1997 04 21 18 21 31 6.6 -9 676.40 -54.3 -52.8 -54.3 63 -99 SPO 1997 04 21 18 22 31 6.5 -9 676.40 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 18 23 31 6.6 -9 676.40 -54.4 -52.8 -54.4 64 -99 SPO 1997 04 21 18 24 31 6.6 -9 676.40 -54.4 -52.8 -54.4 63 -99 SPO 1997 04 21 18 25 30 6.8 -9 676.40 -54.4 -52.8 -54.4 63 -99 SPO 1997 04 21 18 26 30 7.0 -9 676.40 -54.4 -52.7 -54.4 63 -99 SPO 1997 04 21 18 27 30 7.0 -9 676.40 -54.3 -52.7 -54.4 63 -99 SPO 1997 04 21 18 28 31 6.9 -9 676.40 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 18 29 32 6.9 -9 676.40 -54.4 -52.8 -54.4 63 -99 SPO 1997 04 21 18 30 33 6.9 -9 676.40 -54.5 -52.8 -54.5 63 -99 SPO 1997 04 21 18 31 32 6.8 -9 676.40 -54.5 -52.8 -54.5 64 -99 SPO 1997 04 21 18 32 31 6.7 -9 676.40 -54.5 -52.8 -54.5 64 -99 SPO 1997 04 21 18 33 31 6.6 -9 676.40 -54.5 -52.8 -54.5 64 -99 SPO 1997 04 21 18 34 32 6.6 -9 676.40 -54.5 -52.9 -54.5 65 -99 SPO 1997 04 21 18 35 33 6.5 -9 676.40 -54.6 -52.9 -54.5 66 -99 SPO 1997 04 21 18 36 33 6.3 -9 676.40 -54.5 -53.0 -54.5 66 -99 SPO 1997 04 21 18 37 33 6.5 -9 676.40 -54.6 -53.0 -54.6 65 -99 SPO 1997 04 21 18 38 32 6.5 -9 676.40 -54.6 -53.0 -54.5 65 -99 SPO 1997 04 21 18 39 32 6.5 -9 676.30 -54.5 -53.0 -54.5 64 -99 SPO 1997 04 21 18 40 31 6.8 -9 676.30 -54.5 -53.0 -54.5 63 -99 SPO 1997 04 21 18 41 31 7.1 -9 676.30 -54.5 -52.9 -54.5 63 -99 SPO 1997 04 21 18 42 31 7.0 -9 676.20 -54.5 -52.9 -54.5 63 -99 SPO 1997 04 21 18 43 32 7.1 -9 676.20 -54.6 -52.8 -54.6 64 -99 SPO 1997 04 21 18 44 33 7.1 -9 676.20 -54.6 -52.8 -54.6 64 -99 SPO 1997 04 21 18 45 33 7.0 -9 676.20 -54.5 -52.8 -54.6 63 -99 SPO 1997 04 21 18 46 33 7.2 -9 676.20 -54.6 -52.8 -54.6 64 -99 SPO 1997 04 21 18 47 32 7.0 -9 676.20 -54.6 -52.8 -54.6 65 -99 SPO 1997 04 21 18 48 32 7.2 -9 676.20 -54.5 -52.8 -54.5 63 -99 SPO 1997 04 21 18 49 31 7.3 -9 676.20 -54.5 -52.7 -54.5 63 -99 SPO 1997 04 21 18 50 32 7.2 -9 676.20 -54.4 -52.7 -54.5 62 -99 SPO 1997 04 21 18 51 31 7.2 -9 676.20 -54.5 -52.8 -54.5 63 -99 SPO 1997 04 21 18 52 31 7.3 -9 676.20 -54.5 -52.8 -54.5 63 -99 SPO 1997 04 21 18 53 30 7.2 -9 676.20 -54.4 -52.9 -54.5 63 -99 SPO 1997 04 21 18 54 30 7.5 -9 676.20 -54.5 -52.8 -54.5 63 -99 SPO 1997 04 21 18 55 30 7.5 -9 676.20 -54.5 -52.8 -54.5 64 -99 SPO 1997 04 21 18 56 31 7.5 -9 676.10 -54.5 -52.8 -54.6 65 -99 SPO 1997 04 21 18 57 31 7.3 -9 676.10 -54.6 -52.8 -54.6 66 -99 SPO 1997 04 21 18 58 31 7.3 -9 676.10 -54.6 -52.8 -54.7 65 -99 SPO 1997 04 21 18 59 31 7.2 -9 676.10 -54.6 -52.8 -54.6 64 -99 SPO 1997 04 21 19 00 31 7.4 -9 676.10 -54.6 -52.8 -54.6 63 0 SPO 1997 04 21 19 01 30 7.2 -9 676.10 -54.6 -52.8 -54.6 63 -99 SPO 1997 04 21 19 02 29 7.4 -9 676.10 -54.5 -52.8 -54.6 63 -99 SPO 1997 04 21 19 03 29 7.5 -9 676.10 -54.5 -52.8 -54.6 62 -99 SPO 1997 04 21 19 04 29 7.6 -9 676.00 -54.5 -52.7 -54.5 63 -99 SPO 1997 04 21 19 05 29 7.7 -9 676.00 -54.4 -52.6 -54.5 63 -99 SPO 1997 04 21 19 06 29 7.7 -9 676.00 -54.4 -52.6 -54.4 63 -99 SPO 1997 04 21 19 07 28 7.7 -9 676.00 -54.4 -52.6 -54.4 63 -99 SPO 1997 04 21 19 08 28 7.8 -9 676.00 -54.3 -52.7 -54.4 63 -99 SPO 1997 04 21 19 09 28 7.6 -9 676.00 -54.4 -52.7 -54.4 64 -99 SPO 1997 04 21 19 10 28 7.8 -9 676.00 -54.4 -52.7 -54.4 64 -99 SPO 1997 04 21 19 11 27 7.8 -9 676.00 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 12 28 7.7 -9 675.90 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 13 27 7.9 -9 675.90 -54.4 -52.8 -54.4 63 -99 SPO 1997 04 21 19 14 27 7.7 -9 675.90 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 15 28 7.6 -9 675.90 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 16 28 7.6 -9 675.90 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 17 28 7.6 -9 675.90 -54.3 -52.8 -54.4 63 -99 SPO 1997 04 21 19 18 29 7.4 -9 675.90 -54.4 -52.8 -54.4 64 -99 SPO 1997 04 21 19 19 29 7.7 -9 675.80 -54.3 -52.8 -54.4 65 -99 SPO 1997 04 21 19 20 29 7.7 -9 675.80 -54.3 -52.6 -54.4 65 -99 SPO 1997 04 21 19 21 28 7.7 -9 675.80 -54.3 -52.7 -54.3 65 -99 SPO 1997 04 21 19 22 28 7.9 -9 675.80 -54.2 -52.6 -54.2 64 -99 SPO 1997 04 21 19 23 27 7.9 -9 675.80 -54.2 -52.6 -54.2 64 -99 SPO 1997 04 21 19 24 28 7.8 -9 675.80 -54.2 -52.6 -54.2 63 -99 SPO 1997 04 21 19 25 29 8.0 -9 675.80 -54.1 -52.6 -54.2 63 -99 SPO 1997 04 21 19 26 29 7.7 -9 675.80 -54.1 -52.7 -54.2 62 -99 SPO 1997 04 21 19 27 30 7.7 -9 675.80 -54.2 -52.7 -54.2 63 -99 SPO 1997 04 21 19 28 30 7.4 -9 675.80 -54.2 -52.7 -54.3 64 -99 SPO 1997 04 21 19 29 29 7.3 -9 675.80 -54.3 -52.8 -54.3 65 -99 SPO 1997 04 21 19 30 29 7.3 -9 675.80 -54.3 -52.9 -54.4 65 -99 SPO 1997 04 21 19 31 29 7.3 -9 675.80 -54.3 -52.9 -54.4 65 -99 SPO 1997 04 21 19 32 29 7.2 -9 675.80 -54.3 -52.9 -54.3 65 -99 SPO 1997 04 21 19 33 30 7.4 -9 675.80 -54.3 -52.9 -54.4 66 -99 SPO 1997 04 21 19 34 31 7.2 -9 675.80 -54.4 -53.0 -54.4 66 -99 SPO 1997 04 21 19 35 31 7.0 -9 675.80 -54.4 -53.0 -54.4 64 -99 SPO 1997 04 21 19 36 31 7.1 -9 675.80 -54.4 -53.1 -54.4 64 -99 SPO 1997 04 21 19 37 31 7.0 -9 675.90 -54.4 -53.1 -54.5 63 -99 SPO 1997 04 21 19 38 31 6.8 -9 675.90 -54.5 -53.1 -54.5 64 -99 SPO 1997 04 21 19 39 31 7.0 -9 675.80 -54.5 -53.1 -54.5 64 -99 SPO 1997 04 21 19 40 32 7.1 -9 675.90 -54.5 -53.1 -54.5 64 -99 SPO 1997 04 21 19 41 32 7.1 -9 675.90 -54.5 -53.1 -54.5 64 -99 SPO 1997 04 21 19 42 32 7.1 -9 675.90 -54.5 -53.2 -54.5 64 -99 SPO 1997 04 21 19 43 31 7.1 -9 675.80 -54.5 -53.2 -54.5 64 -99 SPO 1997 04 21 19 44 30 7.1 -9 675.80 -54.5 -53.2 -54.5 64 -99 SPO 1997 04 21 19 45 29 7.2 -9 675.80 -54.5 -53.2 -54.5 63 -99 SPO 1997 04 21 19 46 29 7.5 -9 675.80 -54.5 -53.2 -54.5 63 -99 SPO 1997 04 21 19 47 29 7.2 -9 675.80 -54.5 -53.1 -54.5 63 -99 SPO 1997 04 21 19 48 29 7.2 -9 675.80 -54.5 -53.1 -54.5 63 -99 SPO 1997 04 21 19 49 30 7.3 -9 675.80 -54.5 -53.2 -54.6 63 -99 SPO 1997 04 21 19 50 30 7.1 -9 675.80 -54.6 -53.2 -54.6 64 -99 SPO 1997 04 21 19 51 31 7.0 -9 675.80 -54.6 -53.2 -54.6 65 -99 SPO 1997 04 21 19 52 31 7.1 -9 675.80 -54.6 -53.2 -54.6 65 -99 SPO 1997 04 21 19 53 31 6.8 -9 675.80 -54.6 -53.3 -54.7 65 -99 SPO 1997 04 21 19 54 31 6.8 -9 675.80 -54.7 -53.3 -54.7 66 -99 SPO 1997 04 21 19 55 32 6.9 -9 675.80 -54.7 -53.3 -54.7 65 -99 SPO 1997 04 21 19 56 32 6.7 -9 675.80 -54.7 -53.3 -54.7 65 -99 SPO 1997 04 21 19 57 31 6.5 -9 675.80 -54.8 -53.4 -54.7 64 -99 SPO 1997 04 21 19 58 31 6.7 -9 675.80 -54.8 -53.4 -54.8 63 -99 SPO 1997 04 21 19 59 30 6.8 -9 675.90 -54.8 -53.5 -54.8 62 -99 SPO 1997 04 21 20 00 31 6.8 -9 675.80 -54.8 -53.5 -54.8 63 0 SPO 1997 04 21 20 01 31 6.8 -9 675.80 -54.8 -53.4 -54.8 62 -99 SPO 1997 04 21 20 02 30 6.5 -9 675.80 -54.8 -53.5 -54.9 63 -99 SPO 1997 04 21 20 03 30 6.8 -9 675.80 -54.9 -53.5 -54.9 64 -99 SPO 1997 04 21 20 04 29 6.7 -9 675.80 -54.9 -53.5 -54.9 64 -99 SPO 1997 04 21 20 05 30 6.7 -9 675.80 -54.9 -53.4 -54.9 64 -99 SPO 1997 04 21 20 06 30 7.0 -9 675.80 -54.8 -53.4 -54.9 63 -99 SPO 1997 04 21 20 07 29 7.0 -9 675.80 -54.8 -53.3 -54.9 63 -99 SPO 1997 04 21 20 08 29 7.1 -9 675.80 -54.8 -53.3 -54.8 63 -99 SPO 1997 04 21 20 09 29 7.1 -9 675.80 -54.8 -53.2 -54.8 63 -99 SPO 1997 04 21 20 10 28 6.8 -9 675.80 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 21 20 11 29 7.0 -9 675.80 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 21 20 12 29 6.9 -9 675.80 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 21 20 13 30 6.6 -9 675.80 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 21 20 14 30 6.8 -9 675.80 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 21 20 15 31 6.8 -9 675.80 -54.7 -53.3 -54.8 62 -99 SPO 1997 04 21 20 16 32 6.6 -9 675.80 -54.8 -53.4 -54.8 63 -99 SPO 1997 04 21 20 17 33 6.6 -9 675.80 -54.8 -53.4 -54.9 63 -99 SPO 1997 04 21 20 18 34 6.0 -9 675.80 -54.8 -53.4 -54.9 64 -99 SPO 1997 04 21 20 19 35 5.9 -9 675.80 -54.9 -53.6 -54.9 65 -99 SPO 1997 04 21 20 20 36 6.0 -9 675.90 -55.0 -53.6 -55.0 65 -99 SPO 1997 04 21 20 21 38 5.8 -9 675.90 -55.0 -53.6 -55.0 64 -99 SPO 1997 04 21 20 22 39 5.7 -9 675.90 -55.1 -53.7 -55.1 64 -99 SPO 1997 04 21 20 23 40 5.4 -9 675.90 -55.1 -53.7 -55.1 64 -99 SPO 1997 04 21 20 24 43 5.3 -9 675.90 -55.1 -53.8 -55.1 64 -99 SPO 1997 04 21 20 25 45 5.2 -9 675.90 -55.2 -53.8 -55.2 65 -99 SPO 1997 04 21 20 26 45 5.0 -9 675.90 -55.2 -53.9 -55.2 64 -99 SPO 1997 04 21 20 27 47 4.8 -9 675.90 -55.3 -53.9 -55.3 65 -99 SPO 1997 04 21 20 28 46 5.1 -9 675.90 -55.3 -53.9 -55.4 64 -99 SPO 1997 04 21 20 29 46 4.8 -9 675.90 -55.4 -54.0 -55.4 65 -99 SPO 1997 04 21 20 30 46 4.9 -9 675.90 -55.5 -54.0 -55.5 65 -99 SPO 1997 04 21 20 31 45 5.1 -9 675.80 -55.4 -54.1 -55.5 62 -99 SPO 1997 04 21 20 32 47 4.8 -9 675.90 -55.5 -54.2 -55.5 63 -99 SPO 1997 04 21 20 33 45 4.6 -9 675.90 -55.5 -54.2 -55.5 63 -99 SPO 1997 04 21 20 34 45 4.9 -9 675.80 -55.6 -54.3 -55.6 62 -99 SPO 1997 04 21 20 35 44 4.8 -9 675.80 -55.6 -54.3 -55.6 62 -99 SPO 1997 04 21 20 36 44 5.1 -9 675.80 -55.6 -54.2 -55.7 62 -99 SPO 1997 04 21 20 37 44 5.3 -9 675.80 -55.6 -54.2 -55.6 62 -99 SPO 1997 04 21 20 38 44 4.9 -9 675.80 -55.5 -54.3 -55.5 62 -99 SPO 1997 04 21 20 39 44 4.9 -9 675.80 -55.6 -54.3 -55.7 63 -99 SPO 1997 04 21 20 40 45 5.1 -9 675.80 -55.7 -54.3 -55.6 64 -99 SPO 1997 04 21 20 41 44 5.2 -9 675.80 -55.7 -54.2 -55.7 64 -99 SPO 1997 04 21 20 42 45 5.1 -9 675.80 -55.6 -54.3 -55.7 62 -99 SPO 1997 04 21 20 43 45 5.0 -9 675.80 -55.6 -54.3 -55.7 62 -99 SPO 1997 04 21 20 44 45 5.1 -9 675.80 -55.7 -54.4 -55.8 62 -99 SPO 1997 04 21 20 45 46 5.1 -9 675.80 -55.8 -54.3 -55.8 62 -99 SPO 1997 04 21 20 46 46 5.0 -9 675.80 -55.8 -54.3 -55.8 62 -99 SPO 1997 04 21 20 47 46 5.1 -9 675.80 -55.8 -54.4 -55.8 61 -99 SPO 1997 04 21 20 48 45 4.9 -9 675.80 -55.8 -54.4 -55.9 61 -99 SPO 1997 04 21 20 49 44 5.2 -9 675.70 -55.9 -54.4 -55.9 62 -99 SPO 1997 04 21 20 50 43 5.1 -9 675.70 -55.9 -54.4 -55.9 63 -99 SPO 1997 04 21 20 51 42 5.3 -9 675.70 -55.8 -54.4 -55.9 62 -99 SPO 1997 04 21 20 52 42 5.5 -9 675.70 -55.8 -54.4 -55.8 62 -99 SPO 1997 04 21 20 53 41 5.6 -9 675.70 -55.8 -54.4 -55.8 62 -99 SPO 1997 04 21 20 54 40 5.6 -9 675.70 -55.8 -54.3 -55.8 62 -99 SPO 1997 04 21 20 55 40 5.7 -9 675.70 -55.8 -54.3 -55.8 61 -99 SPO 1997 04 21 20 56 40 5.8 -9 675.70 -55.8 -54.2 -55.8 61 -99 SPO 1997 04 21 20 57 40 5.9 -9 675.70 -55.8 -54.2 -55.8 61 -99 SPO 1997 04 21 20 58 40 6.0 -9 675.60 -55.8 -54.2 -55.8 61 -99 SPO 1997 04 21 20 59 40 6.0 -9 675.60 -55.7 -54.2 -55.8 61 -99 SPO 1997 04 21 21 00 39 6.2 -9 675.60 -55.6 -54.1 -55.8 62 0 SPO 1997 04 21 21 01 38 6.1 -9 675.60 -55.7 -54.0 -55.8 62 -99 SPO 1997 04 21 21 02 37 6.2 -9 675.60 -55.6 -53.9 -55.7 62 -99 SPO 1997 04 21 21 03 36 6.5 -9 675.60 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 21 04 35 6.4 -9 675.60 -55.5 -53.8 -55.6 62 -99 SPO 1997 04 21 21 05 36 6.5 -9 675.60 -55.5 -53.8 -55.6 62 -99 SPO 1997 04 21 21 06 36 6.6 -9 675.60 -55.4 -53.8 -55.5 61 -99 SPO 1997 04 21 21 07 35 6.8 -9 675.60 -55.4 -53.8 -55.5 61 -99 SPO 1997 04 21 21 08 35 6.6 -9 675.60 -55.4 -53.8 -55.5 61 -99 SPO 1997 04 21 21 09 34 6.5 -9 675.60 -55.4 -54.0 -55.5 62 -99 SPO 1997 04 21 21 10 34 6.4 -9 675.60 -55.5 -54.0 -55.6 63 -99 SPO 1997 04 21 21 11 35 6.5 -9 675.50 -55.5 -54.0 -55.6 63 -99 SPO 1997 04 21 21 12 37 6.2 -9 675.50 -55.5 -54.0 -55.6 63 -99 SPO 1997 04 21 21 13 38 6.5 -9 675.50 -55.6 -53.9 -55.6 64 -99 SPO 1997 04 21 21 14 34 6.2 -9 675.50 -55.6 -54.0 -55.6 64 -99 SPO 1997 04 21 21 15 34 6.5 -9 675.50 -55.7 -54.2 -55.7 65 -99 SPO 1997 04 21 21 16 37 6.7 -9 675.50 -55.6 -53.8 -55.7 63 -99 SPO 1997 04 21 21 17 34 6.9 -9 675.50 -55.7 -53.8 -55.7 64 -99 SPO 1997 04 21 21 18 34 7.0 -9 675.40 -55.7 -53.6 -55.7 63 -99 SPO 1997 04 21 21 19 32 7.0 -9 675.40 -55.6 -53.8 -55.7 62 -99 SPO 1997 04 21 21 20 33 7.1 -9 675.40 -55.6 -53.6 -55.7 62 -99 SPO 1997 04 21 21 21 32 7.0 -9 675.40 -55.6 -53.6 -55.7 62 -99 SPO 1997 04 21 21 22 30 7.1 -9 675.40 -55.7 -53.6 -55.7 64 -99 SPO 1997 04 21 21 23 30 7.1 -9 675.40 -55.6 -53.6 -55.7 63 -99 SPO 1997 04 21 21 24 31 7.3 -9 675.40 -55.5 -53.7 -55.6 63 -99 SPO 1997 04 21 21 25 30 7.1 -9 675.40 -55.5 -53.6 -55.6 63 -99 SPO 1997 04 21 21 26 29 6.9 -9 675.40 -55.6 -53.8 -55.6 65 -99 SPO 1997 04 21 21 27 29 6.9 -9 675.40 -55.6 -53.8 -55.7 64 -99 SPO 1997 04 21 21 28 30 7.2 -9 675.30 -55.6 -53.9 -55.6 64 -99 SPO 1997 04 21 21 29 29 7.3 -9 675.30 -55.5 -53.6 -55.6 62 -99 SPO 1997 04 21 21 30 28 7.2 -9 675.30 -55.5 -53.8 -55.5 62 -99 SPO 1997 04 21 21 31 31 7.9 -9 675.30 -55.4 -53.3 -55.5 61 -99 SPO 1997 04 21 21 32 30 7.5 -9 675.30 -55.4 -53.3 -55.5 62 -99 SPO 1997 04 21 21 33 30 7.4 -9 675.30 -55.4 -53.5 -55.5 62 -99 SPO 1997 04 21 21 34 30 7.5 -9 675.30 -55.4 -53.5 -55.5 62 -99 SPO 1997 04 21 21 35 32 7.5 -9 675.30 -55.4 -53.5 -55.5 63 -99 SPO 1997 04 21 21 36 33 7.5 -9 675.30 -55.5 -53.3 -55.5 64 -99 SPO 1997 04 21 21 37 32 7.0 -9 675.30 -55.5 -53.5 -55.6 63 -99 SPO 1997 04 21 21 38 32 6.8 -9 675.30 -55.5 -53.7 -55.5 63 -99 SPO 1997 04 21 21 39 33 6.9 -9 675.30 -55.6 -53.8 -55.6 64 -99 SPO 1997 04 21 21 40 34 7.0 -9 675.30 -55.6 -53.8 -55.6 64 -99 SPO 1997 04 21 21 41 33 6.8 -9 675.30 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 21 42 32 6.9 -9 675.30 -55.6 -53.8 -55.7 62 -99 SPO 1997 04 21 21 43 32 7.0 -9 675.30 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 21 44 30 7.0 -9 675.30 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 21 45 31 7.2 -9 675.30 -55.6 -53.8 -55.6 63 -99 SPO 1997 04 21 21 46 30 7.3 -9 675.30 -55.5 -53.7 -55.5 62 -99 SPO 1997 04 21 21 47 30 6.9 -9 675.30 -55.6 -53.7 -55.6 63 -99 SPO 1997 04 21 21 48 29 7.1 -9 675.30 -55.6 -53.7 -55.6 64 -99 SPO 1997 04 21 21 49 29 7.1 -9 675.30 -55.5 -53.7 -55.6 64 -99 SPO 1997 04 21 21 50 29 7.1 -9 675.30 -55.5 -53.7 -55.6 64 -99 SPO 1997 04 21 21 51 29 7.0 -9 675.30 -55.5 -53.7 -55.6 63 -99 SPO 1997 04 21 21 52 28 7.1 -9 675.30 -55.5 -53.7 -55.6 62 -99 SPO 1997 04 21 21 53 29 7.0 -9 675.30 -55.6 -53.6 -55.6 62 -99 SPO 1997 04 21 21 54 29 7.0 -9 675.30 -55.6 -53.6 -55.6 62 -99 SPO 1997 04 21 21 55 28 7.1 -9 675.30 -55.6 -53.6 -55.6 62 -99 SPO 1997 04 21 21 56 28 7.2 -9 675.30 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 21 57 28 7.1 -9 675.30 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 21 58 28 7.2 -9 675.30 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 21 59 28 7.3 -9 675.20 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 22 00 28 7.3 -9 675.20 -55.6 -53.6 -55.6 63 0 SPO 1997 04 21 22 01 28 7.3 -9 675.20 -55.6 -53.6 -55.6 64 -99 SPO 1997 04 21 22 02 27 7.4 -9 675.20 -55.6 -53.5 -55.6 64 -99 SPO 1997 04 21 22 03 27 7.3 -9 675.20 -55.6 -53.4 -55.6 63 -99 SPO 1997 04 21 22 04 28 7.2 -9 675.20 -55.6 -53.4 -55.6 63 -99 SPO 1997 04 21 22 05 28 7.0 -9 675.30 -55.5 -53.4 -55.6 62 -99 SPO 1997 04 21 22 06 29 7.0 -9 675.30 -55.4 -53.5 -55.6 61 -99 SPO 1997 04 21 22 07 30 6.8 -9 675.30 -55.5 -53.5 -55.6 62 -99 SPO 1997 04 21 22 08 31 6.7 -9 675.30 -55.6 -53.5 -55.6 63 -99 SPO 1997 04 21 22 09 32 6.7 -9 675.30 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 22 10 32 6.6 -9 675.30 -55.6 -53.6 -55.6 63 -99 SPO 1997 04 21 22 11 32 6.3 -9 675.30 -55.6 -53.7 -55.6 63 -99 SPO 1997 04 21 22 12 32 6.4 -9 675.30 -55.6 -53.8 -55.6 63 -99 SPO 1997 04 21 22 13 33 6.6 -9 675.30 -55.6 -53.8 -55.6 63 -99 SPO 1997 04 21 22 14 33 6.5 -9 675.30 -55.6 -53.8 -55.6 63 -99 SPO 1997 04 21 22 15 32 6.5 -9 675.30 -55.6 -53.8 -55.6 63 -99 SPO 1997 04 21 22 16 33 6.5 -9 675.30 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 22 17 34 6.3 -9 675.30 -55.6 -53.8 -55.6 62 -99 SPO 1997 04 21 22 18 34 6.2 -9 675.30 -55.6 -53.7 -55.6 63 -99 SPO 1997 04 21 22 19 34 6.1 -9 675.30 -55.6 -53.7 -55.6 63 -99 SPO 1997 04 21 22 20 34 6.1 -9 675.40 -55.6 -53.6 -55.6 64 -99 SPO 1997 04 21 22 21 35 6.2 -9 675.40 -55.6 -53.6 -55.6 65 -99 SPO 1997 04 21 22 22 36 6.1 -9 675.40 -55.5 -53.6 -55.6 64 -99 SPO 1997 04 21 22 23 38 5.9 -9 675.40 -55.5 -53.7 -55.6 64 -99 SPO 1997 04 21 22 24 40 5.6 -9 675.40 -55.6 -53.8 -55.6 65 -99 SPO 1997 04 21 22 25 41 5.2 -9 675.40 -55.6 -53.8 -55.7 64 -99 SPO 1997 04 21 22 26 42 4.9 -9 675.40 -55.8 -53.8 -55.8 65 -99 SPO 1997 04 21 22 27 43 4.9 -9 675.40 -55.8 -54.0 -55.8 64 -99 SPO 1997 04 21 22 28 45 5.0 -9 675.40 -55.8 -54.0 -55.8 64 -99 SPO 1997 04 21 22 29 46 4.8 -9 675.50 -55.8 -54.1 -55.8 64 -99 SPO 1997 04 21 22 30 46 4.9 -9 675.50 -55.9 -54.1 -55.9 65 -99 SPO 1997 04 21 22 31 48 4.8 -9 675.50 -55.9 -54.2 -56.0 65 -99 SPO 1997 04 21 22 32 49 4.6 -9 675.50 -56.2 -54.2 -56.1 67 -99 SPO 1997 04 21 22 33 46 4.1 -9 675.50 -57.9 -54.3 -56.9 78 -99 SPO 1997 04 21 22 34 46 3.8 -9 675.40 -58.7 -54.4 -57.6 79 -99 SPO 1997 04 21 22 35 48 3.8 -9 675.40 -58.5 -54.5 -57.8 72 -99 SPO 1997 04 21 22 36 46 4.0 -9 675.40 -58.4 -54.4 -57.8 68 -99 SPO 1997 04 21 22 37 46 4.2 -9 675.40 -58.2 -54.4 -57.8 64 -99 SPO 1997 04 21 22 38 48 4.5 -9 675.40 -58.0 -54.4 -57.6 62 -99 SPO 1997 04 21 22 39 50 4.7 -9 675.40 -57.7 -54.5 -57.4 60 -99 SPO 1997 04 21 22 40 52 4.8 -9 675.40 -57.5 -54.5 -57.3 61 -99 SPO 1997 04 21 22 41 53 4.7 -9 675.40 -57.4 -54.4 -57.3 61 -99 SPO 1997 04 21 22 42 52 4.9 -9 675.40 -57.3 -54.4 -57.2 61 -99 SPO 1997 04 21 22 43 51 5.1 -9 675.40 -57.0 -54.4 -57.0 59 -99 SPO 1997 04 21 22 44 52 5.0 -9 675.40 -56.9 -54.3 -56.9 60 -99 SPO 1997 04 21 22 45 51 4.9 -9 675.30 -56.9 -54.4 -56.9 61 -99 SPO 1997 04 21 22 46 52 5.3 -9 675.30 -56.8 -54.4 -56.9 61 -99 SPO 1997 04 21 22 47 52 5.3 -9 675.30 -56.7 -54.2 -56.9 60 -99 SPO 1997 04 21 22 48 51 5.3 -9 675.40 -56.8 -54.2 -56.9 60 -99 SPO 1997 04 21 22 49 51 4.8 -9 675.40 -57.1 -54.2 -57.0 63 -99 SPO 1997 04 21 22 50 49 4.1 -9 675.40 -59.0 -54.3 -57.9 73 -99 SPO 1997 04 21 22 51 51 3.8 -9 675.40 -59.8 -54.4 -58.7 72 -99 SPO 1997 04 21 22 52 52 3.7 -9 675.40 -60.4 -54.4 -59.2 71 -99 SPO 1997 04 21 22 53 54 3.8 -9 675.40 -60.8 -54.4 -59.6 70 -99 SPO 1997 04 21 22 54 55 3.9 -9 675.40 -61.0 -54.6 -59.9 68 -99 SPO 1997 04 21 22 55 55 3.9 -9 675.30 -61.0 -54.6 -60.0 66 -99 SPO 1997 04 21 22 56 53 4.0 -9 675.30 -61.0 -54.5 -60.1 64 -99 SPO 1997 04 21 22 57 51 3.8 -9 675.30 -61.0 -54.5 -60.2 63 -99 SPO 1997 04 21 22 58 55 3.7 -9 675.30 -61.0 -54.5 -60.2 62 -99 SPO 1997 04 21 22 59 60 3.3 -9 675.30 -61.2 -54.6 -60.4 62 -99 SPO 1997 04 21 23 00 66 2.9 -9 675.30 -61.4 -54.8 -60.6 62 0 SPO 1997 04 21 23 01 67 3.1 -9 675.30 -61.6 -55.0 -60.8 62 -99 SPO 1997 04 21 23 02 63 3.4 -9 675.30 -61.7 -55.2 -61.0 61 -99 SPO 1997 04 21 23 03 63 3.5 -9 675.30 -61.8 -55.2 -61.1 61 -99 SPO 1997 04 21 23 04 66 3.6 -9 675.30 -61.7 -55.5 -61.1 59 -99 SPO 1997 04 21 23 05 68 3.6 -9 675.30 -61.7 -55.7 -61.2 59 -99 SPO 1997 04 21 23 06 68 3.6 -9 675.30 -61.6 -55.7 -61.2 58 -99 SPO 1997 04 21 23 07 65 3.7 -9 675.30 -61.6 -55.7 -61.2 58 -99 SPO 1997 04 21 23 08 62 3.7 -9 675.30 -61.4 -55.8 -61.1 57 -99 SPO 1997 04 21 23 09 63 3.9 -9 675.30 -61.3 -55.6 -61.0 56 -99 SPO 1997 04 21 23 10 67 4.0 -9 675.30 -61.0 -55.8 -61.0 55 -99 SPO 1997 04 21 23 11 67 4.0 -9 675.30 -60.9 -56.0 -60.9 55 -99 SPO 1997 04 21 23 12 66 4.0 -9 675.30 -60.8 -55.9 -60.8 55 -99 SPO 1997 04 21 23 13 64 4.0 -9 675.30 -60.8 -55.8 -60.8 56 -99 SPO 1997 04 21 23 14 62 4.2 -9 675.30 -60.7 -55.8 -60.8 55 -99 SPO 1997 04 21 23 15 62 4.3 -9 675.30 -60.6 -55.6 -60.7 55 -99 SPO 1997 04 21 23 16 61 4.4 -9 675.30 -60.5 -55.6 -60.6 55 -99 SPO 1997 04 21 23 17 60 4.5 -9 675.30 -60.5 -55.6 -60.6 55 -99 SPO 1997 04 21 23 18 59 4.5 -9 675.30 -60.4 -55.5 -60.6 55 -99 SPO 1997 04 21 23 19 57 4.5 -9 675.30 -60.4 -55.4 -60.6 56 -99 SPO 1997 04 21 23 20 56 4.5 -9 675.30 -60.3 -55.2 -60.5 55 -99 SPO 1997 04 21 23 21 55 4.6 -9 675.30 -60.3 -55.2 -60.5 55 -99 SPO 1997 04 21 23 22 57 4.7 -9 675.30 -60.3 -55.1 -60.5 55 -99 SPO 1997 04 21 23 23 55 4.8 -9 675.20 -60.3 -55.0 -60.5 55 -99 SPO 1997 04 21 23 24 55 4.8 -9 675.20 -60.3 -54.9 -60.5 55 -99 SPO 1997 04 21 23 25 54 4.8 -9 675.20 -60.4 -54.9 -60.5 56 -99 SPO 1997 04 21 23 26 53 5.0 -9 675.20 -60.4 -54.7 -60.5 56 -99 SPO 1997 04 21 23 27 53 4.9 -9 675.20 -60.4 -54.8 -60.6 56 -99 SPO 1997 04 21 23 28 55 4.9 -9 675.20 -60.6 -54.8 -60.6 56 -99 SPO 1997 04 21 23 29 55 4.9 -9 675.20 -60.8 -54.8 -60.7 58 -99 SPO 1997 04 21 23 30 54 4.9 -9 675.20 -60.9 -54.7 -60.8 59 -99 SPO 1997 04 21 23 31 54 5.0 -9 675.20 -61.0 -54.7 -61.0 59 -99 SPO 1997 04 21 23 32 52 5.0 -9 675.10 -61.0 -54.6 -61.0 58 -99 SPO 1997 04 21 23 33 51 5.0 -9 675.10 -61.1 -54.6 -61.1 58 -99 SPO 1997 04 21 23 34 50 5.0 -9 675.10 -61.1 -54.6 -61.1 57 -99 SPO 1997 04 21 23 35 48 5.1 -9 675.10 -61.1 -54.7 -61.1 57 -99 SPO 1997 04 21 23 36 47 5.3 -9 675.10 -61.0 -54.6 -61.0 56 -99 SPO 1997 04 21 23 37 48 5.4 -9 675.10 -60.5 -54.5 -60.6 53 -99 SPO 1997 04 21 23 38 49 5.3 -9 675.10 -60.0 -54.5 -60.2 52 -99 SPO 1997 04 21 23 39 53 5.3 -9 675.10 -59.8 -54.6 -60.0 53 -99 SPO 1997 04 21 23 40 54 5.1 -9 675.10 -59.8 -54.7 -60.0 55 -99 SPO 1997 04 21 23 41 54 4.8 -9 675.10 -60.2 -54.9 -60.2 58 -99 SPO 1997 04 21 23 42 52 4.3 -9 675.10 -61.1 -54.9 -60.8 62 -99 SPO 1997 04 21 23 43 54 4.0 -9 675.10 -61.4 -55.0 -61.2 63 -99 SPO 1997 04 21 23 44 55 4.0 -9 675.10 -61.3 -55.0 -61.2 59 -99 SPO 1997 04 21 23 45 56 4.0 -9 675.10 -61.3 -55.0 -61.2 59 -99 SPO 1997 04 21 23 46 55 3.9 -9 675.10 -61.2 -55.0 -61.2 57 -99 SPO 1997 04 21 23 47 55 4.0 -9 675.10 -61.3 -55.2 -61.2 57 -99 SPO 1997 04 21 23 48 54 4.2 -9 675.00 -61.2 -55.4 -61.2 56 -99 SPO 1997 04 21 23 49 55 4.4 -9 675.00 -61.1 -55.5 -61.1 56 -99 SPO 1997 04 21 23 50 55 4.6 -9 675.00 -61.0 -55.7 -61.0 56 -99 SPO 1997 04 21 23 51 56 4.7 -9 675.00 -60.7 -55.8 -60.8 54 -99 SPO 1997 04 21 23 52 56 4.8 -9 675.00 -60.4 -55.8 -60.6 54 -99 SPO 1997 04 21 23 53 55 4.8 -9 675.00 -60.2 -55.8 -60.4 54 -99 SPO 1997 04 21 23 54 54 4.6 -9 675.00 -60.1 -55.7 -60.3 55 -99 SPO 1997 04 21 23 55 54 4.4 -9 675.00 -60.0 -55.7 -60.3 54 -99 SPO 1997 04 21 23 56 57 4.3 -9 675.00 -60.0 -55.8 -60.3 54 -99 SPO 1997 04 21 23 57 58 4.3 -9 675.00 -60.1 -56.1 -60.3 55 -99 SPO 1997 04 21 23 58 59 4.2 -9 675.00 -60.1 -56.2 -60.4 -99 -99 SPO 1997 04 21 23 59 59 4.3 -9 675.00 -60.2 -56.2 -60.4 -99 -99 SPO 1997 04 22 00 00 58 4.2 -9 675.00 -60.2 -56.0 -60.4 -99 0 SPO 1997 04 22 00 01 58 4.2 -9 675.00 -60.2 -56.0 -60.3 -99 -99 SPO 1997 04 22 00 02 58 4.2 -9 675.00 -60.2 -56.0 -60.4 -99 -99 SPO 1997 04 22 00 03 58 4.3 -9 675.00 -60.2 -56.0 -60.4 -99 -99 SPO 1997 04 22 00 04 57 4.3 -9 675.00 -60.3 -55.9 -60.4 -99 -99 SPO 1997 04 22 00 05 57 4.5 -9 674.90 -60.3 -55.8 -60.4 -99 -99 SPO 1997 04 22 00 06 57 4.4 -9 674.90 -60.2 -55.9 -60.4 -99 -99 SPO 1997 04 22 00 07 58 4.4 -9 674.90 -60.2 -56.0 -60.3 -99 -99 SPO 1997 04 22 00 08 56 4.4 -9 674.90 -60.1 -55.9 -60.2 -99 -99 SPO 1997 04 22 00 09 53 4.6 -9 674.90 -59.9 -55.8 -60.1 -99 -99 SPO 1997 04 22 00 10 52 4.7 -9 674.90 -59.8 -55.7 -60.0 -99 -99 SPO 1997 04 22 00 11 53 4.7 -9 674.90 -59.6 -55.8 -59.9 -99 -99 SPO 1997 04 22 00 12 54 4.8 -9 674.90 -59.5 -55.8 -59.8 -99 -99 SPO 1997 04 22 00 13 53 4.9 -9 674.90 -59.5 -55.7 -59.8 56 -99 SPO 1997 04 22 00 14 53 4.8 -9 674.90 -59.4 -55.6 -59.7 56 -99 SPO 1997 04 22 00 15 53 4.8 -9 674.90 -59.4 -55.5 -59.6 56 -99 SPO 1997 04 22 00 16 53 4.9 -9 674.90 -59.4 -55.4 -59.6 56 -99 SPO 1997 04 22 00 17 54 5.0 -9 674.90 -59.4 -55.4 -59.6 56 -99 SPO 1997 04 22 00 18 54 4.9 -9 674.90 -59.3 -55.5 -59.6 55 -99 SPO 1997 04 22 00 19 52 4.7 -9 674.90 -59.3 -55.6 -59.5 56 -99 SPO 1997 04 22 00 20 51 4.7 -9 674.90 -59.3 -55.6 -59.5 56 -99 SPO 1997 04 22 00 21 51 4.7 -9 674.90 -59.3 -55.5 -59.5 57 -99 SPO 1997 04 22 00 22 53 4.4 -9 675.00 -59.3 -55.5 -59.5 57 -99 SPO 1997 04 22 00 23 56 4.3 -9 675.00 -59.3 -55.5 -59.5 58 -99 SPO 1997 04 22 00 24 57 4.3 -9 675.00 -59.4 -55.5 -59.6 59 -99 SPO 1997 04 22 00 25 57 4.2 -9 675.00 -59.6 -55.6 -59.6 60 -99 SPO 1997 04 22 00 26 58 4.1 -9 675.00 -59.6 -55.8 -59.7 60 -99 SPO 1997 04 22 00 27 58 4.0 -9 675.00 -59.8 -55.9 -59.8 60 -99 SPO 1997 04 22 00 28 59 3.8 -9 675.00 -59.8 -56.0 -59.9 60 -99 SPO 1997 04 22 00 29 58 3.7 -9 675.00 -60.0 -56.0 -60.0 60 -99 SPO 1997 04 22 00 30 57 3.7 -9 675.00 -60.2 -55.9 -60.1 60 -99 SPO 1997 04 22 00 31 57 3.8 -9 674.90 -60.2 -56.0 -60.1 59 -99 SPO 1997 04 22 00 32 57 3.9 -9 674.90 -60.3 -55.9 -60.2 59 -99 SPO 1997 04 22 00 33 57 3.9 -9 674.90 -60.3 -55.9 -60.2 58 -99 SPO 1997 04 22 00 34 58 3.9 -9 674.90 -60.3 -56.0 -60.2 58 -99 SPO 1997 04 22 00 35 59 4.0 -9 674.90 -60.3 -56.1 -60.2 59 -99 SPO 1997 04 22 00 36 59 4.0 -9 674.90 -60.3 -56.2 -60.2 59 -99 SPO 1997 04 22 00 37 59 4.1 -9 674.90 -60.4 -56.2 -60.4 60 -99 SPO 1997 04 22 00 38 58 4.4 -9 674.90 -60.5 -56.0 -60.4 60 -99 SPO 1997 04 22 00 39 57 4.4 -9 674.80 -60.5 -55.9 -60.4 59 -99 SPO 1997 04 22 00 40 57 4.5 -9 674.80 -60.5 -55.7 -60.4 59 -99 SPO 1997 04 22 00 41 55 4.6 -9 674.80 -60.5 -55.6 -60.5 59 -99 SPO 1997 04 22 00 42 55 4.6 -9 674.80 -60.5 -55.4 -60.4 58 -99 SPO 1997 04 22 00 43 55 4.6 -9 674.80 -60.5 -55.4 -60.4 57 -99 SPO 1997 04 22 00 44 56 4.6 -9 674.70 -60.5 -55.4 -60.5 57 -99 SPO 1997 04 22 00 45 57 4.7 -9 674.70 -60.6 -55.4 -60.6 58 -99 SPO 1997 04 22 00 46 56 5.0 -9 674.70 -60.7 -55.4 -60.6 59 -99 SPO 1997 04 22 00 47 56 5.1 -9 674.70 -60.6 -55.4 -60.6 58 -99 SPO 1997 04 22 00 48 55 5.2 -9 674.70 -60.6 -55.3 -60.6 58 -99 SPO 1997 04 22 00 49 55 5.2 -9 674.70 -60.6 -55.2 -60.6 59 -99 SPO 1997 04 22 00 50 57 5.0 -9 674.70 -60.6 -55.3 -60.6 59 -99 SPO 1997 04 22 00 51 59 5.0 -9 674.70 -60.6 -55.5 -60.6 59 -99 SPO 1997 04 22 00 52 60 5.0 -9 674.70 -60.7 -55.6 -60.7 59 -99 SPO 1997 04 22 00 53 61 5.0 -9 674.70 -60.8 -55.6 -60.8 59 -99 SPO 1997 04 22 00 54 61 4.9 -9 674.70 -60.8 -55.5 -60.8 59 -99 SPO 1997 04 22 00 55 61 4.8 -9 674.70 -60.9 -55.6 -60.9 59 -99 SPO 1997 04 22 00 56 63 4.8 -9 674.70 -60.9 -55.6 -60.9 59 -99 SPO 1997 04 22 00 57 64 4.9 -9 674.70 -60.8 -55.7 -60.9 58 -99 SPO 1997 04 22 00 58 63 4.8 -9 674.70 -60.8 -55.8 -60.9 58 -99 SPO 1997 04 22 00 59 63 4.8 -9 674.70 -60.8 -55.8 -60.8 58 -99 SPO 1997 04 22 01 00 63 4.7 -9 674.70 -60.7 -55.8 -60.8 58 0 SPO 1997 04 22 01 01 63 4.7 -9 674.70 -60.7 -55.8 -60.8 58 -99 SPO 1997 04 22 01 02 68 4.6 -9 674.70 -60.8 -56.0 -60.8 59 -99 SPO 1997 04 22 01 03 72 4.2 -9 674.70 -61.0 -56.1 -61.0 59 -99 SPO 1997 04 22 01 04 73 3.5 -9 674.70 -61.6 -56.3 -61.3 62 -99 SPO 1997 04 22 01 05 73 3.5 -9 674.70 -62.2 -56.4 -61.7 63 -99 SPO 1997 04 22 01 06 74 3.6 -9 674.70 -62.4 -56.6 -62.0 62 -99 SPO 1997 04 22 01 07 75 4.0 -9 674.70 -62.5 -56.7 -62.0 60 -99 SPO 1997 04 22 01 08 76 4.1 -9 674.70 -62.5 -56.8 -62.2 58 -99 SPO 1997 04 22 01 09 74 4.2 -9 674.70 -62.4 -56.7 -62.1 57 -99 SPO 1997 04 22 01 10 71 4.5 -9 674.70 -62.3 -56.5 -62.0 57 -99 SPO 1997 04 22 01 11 69 4.7 -9 674.70 -62.1 -56.4 -61.9 56 -99 SPO 1997 04 22 01 12 69 4.8 -9 674.70 -62.0 -56.3 -61.9 55 -99 SPO 1997 04 22 01 13 68 4.7 -9 674.70 -61.9 -56.4 -61.8 55 -99 SPO 1997 04 22 01 14 65 4.7 -9 674.70 -61.8 -56.3 -61.7 55 -99 SPO 1997 04 22 01 15 62 4.8 -9 674.60 -61.6 -56.1 -61.7 53 -99 SPO 1997 04 22 01 16 63 4.8 -9 674.60 -61.5 -56.0 -61.6 53 -99 SPO 1997 04 22 01 17 63 4.8 -9 674.60 -61.4 -55.8 -61.5 54 -99 SPO 1997 04 22 01 18 62 4.7 -9 674.60 -61.2 -55.8 -61.4 53 -99 SPO 1997 04 22 01 19 60 4.8 -9 674.60 -61.2 -55.8 -61.4 53 -99 SPO 1997 04 22 01 20 61 4.8 -9 674.60 -61.2 -55.8 -61.4 53 -99 SPO 1997 04 22 01 21 62 4.9 -9 674.60 -61.2 -56.0 -61.4 54 -99 SPO 1997 04 22 01 22 62 4.8 -9 674.60 -61.2 -56.0 -61.4 55 -99 SPO 1997 04 22 01 23 60 4.9 -9 674.60 -61.1 -55.8 -61.3 55 -99 SPO 1997 04 22 01 24 60 4.9 -9 674.60 -61.0 -55.9 -61.2 55 -99 SPO 1997 04 22 01 25 60 5.0 -9 674.60 -61.0 -55.8 -61.2 56 -99 SPO 1997 04 22 01 26 59 5.0 -9 674.60 -60.9 -55.8 -61.1 55 -99 SPO 1997 04 22 01 27 59 4.8 -9 674.60 -61.0 -55.8 -61.1 56 -99 SPO 1997 04 22 01 28 59 4.7 -9 674.60 -60.9 -55.8 -61.0 56 -99 SPO 1997 04 22 01 29 59 4.6 -9 674.60 -60.9 -55.8 -61.0 56 -99 SPO 1997 04 22 01 30 58 4.7 -9 674.60 -61.0 -55.8 -61.1 56 -99 SPO 1997 04 22 01 31 58 4.8 -9 674.50 -61.0 -55.8 -61.1 57 -99 SPO 1997 04 22 01 32 57 4.8 -9 674.50 -61.0 -55.7 -61.2 57 -99 SPO 1997 04 22 01 33 55 4.9 -9 674.50 -61.1 -55.6 -61.2 58 -99 SPO 1997 04 22 01 34 55 4.9 -9 674.50 -61.1 -55.4 -61.2 58 -99 SPO 1997 04 22 01 35 56 5.0 -9 674.50 -61.1 -55.4 -61.2 58 -99 SPO 1997 04 22 01 36 55 5.0 -9 674.50 -61.0 -55.4 -61.1 57 -99 SPO 1997 04 22 01 37 54 5.0 -9 674.40 -61.0 -55.4 -61.1 57 -99 SPO 1997 04 22 01 38 54 5.0 -9 674.40 -61.0 -55.4 -61.1 57 -99 SPO 1997 04 22 01 39 55 5.1 -9 674.40 -60.9 -55.4 -61.1 56 -99 SPO 1997 04 22 01 40 56 5.1 -9 674.40 -61.0 -55.4 -61.1 57 -99 SPO 1997 04 22 01 41 55 5.1 -9 674.40 -61.0 -55.5 -61.1 57 -99 SPO 1997 04 22 01 42 55 5.1 -9 674.40 -61.0 -55.5 -61.1 57 -99 SPO 1997 04 22 01 43 56 5.0 -9 674.40 -61.0 -55.5 -61.1 57 -99 SPO 1997 04 22 01 44 57 4.9 -9 674.40 -61.0 -55.5 -61.1 57 -99 SPO 1997 04 22 01 45 57 5.0 -9 674.40 -61.1 -55.5 -61.2 59 -99 SPO 1997 04 22 01 46 59 5.0 -9 674.40 -61.1 -55.6 -61.2 59 -99 SPO 1997 04 22 01 47 59 5.0 -9 674.40 -61.1 -55.6 -61.2 59 -99 SPO 1997 04 22 01 48 60 5.0 -9 674.40 -61.0 -55.7 -61.1 58 -99 SPO 1997 04 22 01 49 59 5.0 -9 674.40 -61.1 -55.6 -61.1 58 -99 SPO 1997 04 22 01 50 59 5.1 -9 674.40 -61.1 -55.5 -61.2 58 -99 SPO 1997 04 22 01 51 59 5.1 -9 674.40 -61.1 -55.6 -61.2 57 -99 SPO 1997 04 22 01 52 59 5.2 -9 674.40 -61.1 -55.7 -61.1 56 -99 SPO 1997 04 22 01 53 57 5.3 -9 674.40 -61.0 -55.6 -61.1 56 -99 SPO 1997 04 22 01 54 56 5.3 -9 674.30 -60.9 -55.6 -61.0 56 -99 SPO 1997 04 22 01 55 57 5.2 -9 674.40 -60.9 -55.6 -61.0 56 -99 SPO 1997 04 22 01 56 57 5.2 -9 674.40 -60.9 -55.6 -61.0 58 -99 SPO 1997 04 22 01 57 58 5.1 -9 674.30 -60.8 -55.6 -61.0 57 -99 SPO 1997 04 22 01 58 59 5.1 -9 674.30 -60.8 -55.7 -60.9 58 -99 SPO 1997 04 22 01 59 59 5.2 -9 674.30 -60.8 -55.7 -60.9 58 -99 SPO 1997 04 22 02 00 58 5.0 -9 674.30 -60.8 -55.8 -60.9 58 0 SPO 1997 04 22 02 01 58 5.0 -9 674.30 -60.8 -55.8 -60.9 58 -99 SPO 1997 04 22 02 02 58 5.0 -9 674.30 -60.8 -55.7 -60.9 58 -99 SPO 1997 04 22 02 03 58 5.1 -9 674.30 -60.9 -55.7 -61.0 59 -99 SPO 1997 04 22 02 04 59 5.0 -9 674.30 -60.9 -55.8 -61.0 59 -99 SPO 1997 04 22 02 05 60 5.0 -9 674.30 -60.9 -55.9 -61.0 59 -99 SPO 1997 04 22 02 06 61 4.9 -9 674.30 -61.0 -55.8 -61.0 59 -99 SPO 1997 04 22 02 07 62 4.8 -9 674.30 -61.0 -55.8 -61.0 59 -99 SPO 1997 04 22 02 08 63 4.7 -9 674.30 -61.0 -55.9 -61.0 59 -99 SPO 1997 04 22 02 09 64 4.6 -9 674.40 -61.0 -55.9 -61.0 59 -99 SPO 1997 04 22 02 10 63 4.7 -9 674.30 -61.0 -56.0 -61.0 60 -99 SPO 1997 04 22 02 11 62 4.7 -9 674.30 -60.9 -56.0 -61.0 59 -99 SPO 1997 04 22 02 12 62 4.6 -9 674.30 -60.8 -56.0 -61.0 59 -99 SPO 1997 04 22 02 13 63 4.6 -9 674.30 -60.8 -56.0 -60.9 59 -99 SPO 1997 04 22 02 14 64 4.5 -9 674.30 -60.7 -56.0 -60.9 58 -99 SPO 1997 04 22 02 15 64 4.5 -9 674.40 -60.7 -56.0 -60.8 58 -99 SPO 1997 04 22 02 16 61 4.6 -9 674.30 -60.6 -56.0 -60.8 57 -99 SPO 1997 04 22 02 17 60 4.7 -9 674.30 -60.6 -56.0 -60.7 58 -99 SPO 1997 04 22 02 18 60 4.8 -9 674.30 -60.5 -56.0 -60.7 57 -99 SPO 1997 04 22 02 19 60 4.8 -9 674.30 -60.5 -56.0 -60.7 58 -99 SPO 1997 04 22 02 20 59 4.8 -9 674.30 -60.6 -56.0 -60.7 59 -99 SPO 1997 04 22 02 21 60 4.7 -9 674.30 -60.8 -56.0 -60.8 60 -99 SPO 1997 04 22 02 22 61 4.6 -9 674.30 -61.0 -56.0 -61.0 61 -99 SPO 1997 04 22 02 23 61 4.5 -9 674.30 -61.3 -56.0 -61.2 61 -99 SPO 1997 04 22 02 24 61 4.5 -9 674.30 -61.6 -56.2 -61.3 62 -99 SPO 1997 04 22 02 25 60 4.6 -9 674.30 -61.7 -56.3 -61.5 61 -99 SPO 1997 04 22 02 26 59 4.7 -9 674.30 -61.7 -56.3 -61.5 60 -99 SPO 1997 04 22 02 27 59 4.7 -9 674.30 -61.6 -56.2 -61.5 58 -99 SPO 1997 04 22 02 28 58 4.8 -9 674.30 -61.6 -56.2 -61.4 58 -99 SPO 1997 04 22 02 29 58 4.9 -9 674.30 -61.6 -56.2 -61.5 58 -99 SPO 1997 04 22 02 30 59 5.1 -9 674.30 -61.5 -56.0 -61.4 58 -99 SPO 1997 04 22 02 31 57 5.0 -9 674.30 -61.5 -56.1 -61.4 58 -99 SPO 1997 04 22 02 32 57 5.0 -9 674.30 -61.5 -56.0 -61.4 58 -99 SPO 1997 04 22 02 33 56 4.9 -9 674.30 -61.4 -56.0 -61.4 58 -99 SPO 1997 04 22 02 34 56 4.9 -9 674.20 -61.4 -56.0 -61.4 58 -99 SPO 1997 04 22 02 35 55 5.0 -9 674.20 -61.4 -55.8 -61.4 58 -99 SPO 1997 04 22 02 36 54 5.0 -9 674.20 -61.3 -55.7 -61.4 57 -99 SPO 1997 04 22 02 37 54 5.0 -9 674.20 -61.3 -55.7 -61.3 57 -99 SPO 1997 04 22 02 38 55 5.0 -9 674.20 -61.3 -55.8 -61.4 57 -99 SPO 1997 04 22 02 39 54 5.0 -9 674.20 -61.4 -56.0 -61.4 58 -99 SPO 1997 04 22 02 40 56 4.8 -9 674.20 -61.5 -56.2 -61.5 58 -99 SPO 1997 04 22 02 41 55 4.9 -9 674.20 -61.5 -56.2 -61.5 58 -99 SPO 1997 04 22 02 42 57 4.8 -9 674.20 -61.5 -56.2 -61.5 58 -99 SPO 1997 04 22 02 43 57 4.8 -9 674.10 -61.5 -56.1 -61.5 58 -99 SPO 1997 04 22 02 44 57 4.5 -9 674.20 -61.5 -56.3 -61.5 58 -99 SPO 1997 04 22 02 45 58 4.9 -9 674.20 -61.5 -56.3 -61.5 58 -99 SPO 1997 04 22 02 46 58 5.1 -9 674.10 -61.4 -56.0 -61.4 57 -99 SPO 1997 04 22 02 47 57 5.1 -9 674.10 -61.2 -55.7 -61.3 56 -99 SPO 1997 04 22 02 48 58 4.8 -9 674.10 -61.2 -55.9 -61.3 56 -99 SPO 1997 04 22 02 49 56 4.8 -9 674.10 -61.2 -56.1 -61.3 57 -99 SPO 1997 04 22 02 50 56 5.0 -9 674.10 -61.2 -55.9 -61.3 57 -99 SPO 1997 04 22 02 51 55 5.1 -9 674.10 -61.2 -55.8 -61.3 57 -99 SPO 1997 04 22 02 52 55 5.2 -9 674.10 -61.2 -55.7 -61.4 57 -99 SPO 1997 04 22 02 53 57 5.1 -9 674.00 -61.3 -55.6 -61.4 58 -99 SPO 1997 04 22 02 54 55 4.6 -9 674.00 -61.5 -56.1 -61.5 59 -99 SPO 1997 04 22 02 55 57 4.9 -9 674.10 -61.6 -56.1 -61.6 60 -99 SPO 1997 04 22 02 56 54 4.7 -9 674.10 -61.6 -56.3 -61.6 60 -99 SPO 1997 04 22 02 57 54 5.2 -9 674.10 -61.5 -56.0 -61.6 58 -99 SPO 1997 04 22 02 58 53 5.1 -9 674.00 -61.4 -55.9 -61.5 58 -99 SPO 1997 04 22 02 59 53 5.1 -9 674.00 -61.2 -55.6 -61.4 56 -99 SPO 1997 04 22 03 00 53 4.8 -9 674.00 -61.2 -55.8 -61.2 56 0 SPO 1997 04 22 03 01 53 4.8 -9 674.00 -61.1 -56.0 -61.2 56 -99 SPO 1997 04 22 03 02 55 5.3 -9 674.00 -60.9 -55.8 -61.1 56 -99 SPO 1997 04 22 03 03 54 5.2 -9 674.00 -60.8 -55.8 -61.0 57 -99 SPO 1997 04 22 03 04 55 5.0 -9 674.00 -60.7 -55.6 -60.9 57 -99 SPO 1997 04 22 03 05 55 5.2 -9 674.00 -60.6 -55.8 -60.9 57 -99 SPO 1997 04 22 03 06 56 5.3 -9 674.00 -60.5 -55.0 -60.7 57 -99 SPO 1997 04 22 03 07 53 4.7 -9 674.00 -60.6 -55.4 -60.8 59 -99 SPO 1997 04 22 03 08 56 5.0 -9 674.00 -60.5 -55.6 -60.8 58 -99 SPO 1997 04 22 03 09 52 5.0 -9 674.00 -60.7 -55.2 -60.8 59 -99 SPO 1997 04 22 03 10 55 4.7 -9 674.00 -61.2 -55.4 -61.1 61 -99 SPO 1997 04 22 03 11 55 4.3 -9 674.00 -61.5 -56.0 -61.3 61 -99 SPO 1997 04 22 03 12 56 4.4 -9 674.00 -61.6 -55.8 -61.5 60 -99 SPO 1997 04 22 03 13 53 4.7 -9 674.00 -61.6 -55.8 -61.5 59 -99 SPO 1997 04 22 03 14 51 5.0 -9 673.90 -61.4 -55.4 -61.4 58 -99 SPO 1997 04 22 03 15 51 5.2 -9 673.90 -61.2 -55.4 -61.2 58 -99 SPO 1997 04 22 03 16 50 5.4 -9 673.90 -61.2 -55.4 -61.2 59 -99 SPO 1997 04 22 03 17 49 5.5 -9 673.90 -61.0 -55.2 -61.1 58 -99 SPO 1997 04 22 03 18 48 5.5 -9 673.90 -60.9 -55.3 -61.0 58 -99 SPO 1997 04 22 03 19 49 5.4 -9 673.90 -60.8 -55.3 -60.9 58 -99 SPO 1997 04 22 03 20 49 5.4 -9 673.90 -60.7 -55.4 -60.8 58 -99 SPO 1997 04 22 03 21 48 5.2 -9 673.90 -60.6 -55.2 -60.8 58 -99 SPO 1997 04 22 03 22 48 5.1 -9 673.90 -60.4 -55.0 -60.6 57 -99 SPO 1997 04 22 03 23 51 5.3 -9 673.90 -59.6 -55.2 -60.0 53 -99 SPO 1997 04 22 03 24 50 5.2 -9 673.90 -60.1 -55.2 -60.2 57 -99 SPO 1997 04 22 03 25 48 5.2 -9 673.90 -60.6 -55.1 -60.6 60 -99 SPO 1997 04 22 03 26 48 5.0 -9 673.90 -59.9 -55.3 -60.1 56 -99 SPO 1997 04 22 03 27 51 4.9 -9 673.90 -59.4 -55.2 -59.7 55 -99 SPO 1997 04 22 03 28 50 4.9 -9 673.90 -59.3 -55.2 -59.6 56 -99 SPO 1997 04 22 03 29 48 5.0 -9 673.90 -59.8 -55.2 -60.0 60 -99 SPO 1997 04 22 03 30 49 4.4 -9 673.90 -60.4 -55.3 -60.4 63 -99 SPO 1997 04 22 03 31 51 4.7 -9 673.90 -60.8 -55.2 -60.6 64 -99 SPO 1997 04 22 03 32 53 4.2 -9 673.90 -60.8 -55.3 -60.7 62 -99 SPO 1997 04 22 03 33 52 4.2 -9 673.90 -61.0 -55.2 -60.8 62 -99 SPO 1997 04 22 03 34 56 3.6 -9 673.90 -61.0 -55.4 -60.9 60 -99 SPO 1997 04 22 03 35 61 3.3 -9 673.90 -61.3 -55.6 -61.0 62 -99 SPO 1997 04 22 03 36 64 3.5 -9 673.90 -61.5 -55.7 -61.2 62 -99 SPO 1997 04 22 03 37 64 3.5 -9 673.90 -61.6 -55.9 -61.3 63 -99 SPO 1997 04 22 03 38 64 3.6 -9 673.80 -61.5 -56.0 -61.3 62 -99 SPO 1997 04 22 03 39 61 3.7 -9 673.80 -61.4 -56.0 -61.3 60 -99 SPO 1997 04 22 03 40 61 4.0 -9 673.80 -61.4 -56.0 -61.2 60 -99 SPO 1997 04 22 03 41 59 4.1 -9 673.80 -61.3 -55.9 -61.2 60 -99 SPO 1997 04 22 03 42 57 4.3 -9 673.80 -61.3 -55.9 -61.2 59 -99 SPO 1997 04 22 03 43 57 4.4 -9 673.80 -61.2 -55.7 -61.1 59 -99 SPO 1997 04 22 03 44 57 4.4 -9 673.80 -61.2 -55.6 -61.2 59 -99 SPO 1997 04 22 03 45 58 4.4 -9 673.80 -61.2 -55.8 -61.2 59 -99 SPO 1997 04 22 03 46 58 4.4 -9 673.80 -61.2 -55.6 -61.2 59 -99 SPO 1997 04 22 03 47 57 4.2 -9 673.80 -61.3 -55.7 -61.2 59 -99 SPO 1997 04 22 03 48 58 4.5 -9 673.80 -61.5 -55.8 -61.4 61 -99 SPO 1997 04 22 03 49 57 4.4 -9 673.80 -61.7 -55.7 -61.5 61 -99 SPO 1997 04 22 03 50 55 4.4 -9 673.80 -61.8 -55.6 -61.6 61 -99 SPO 1997 04 22 03 51 55 4.3 -9 673.80 -61.7 -55.5 -61.6 59 -99 SPO 1997 04 22 03 52 56 4.5 -9 673.70 -61.6 -55.5 -61.5 58 -99 SPO 1997 04 22 03 53 56 4.5 -9 673.70 -61.6 -55.6 -61.6 58 -99 SPO 1997 04 22 03 54 54 4.5 -9 673.70 -61.6 -55.5 -61.5 58 -99 SPO 1997 04 22 03 55 54 4.6 -9 673.70 -61.6 -55.2 -61.5 58 -99 SPO 1997 04 22 03 56 54 4.5 -9 673.70 -61.7 -55.2 -61.6 58 -99 SPO 1997 04 22 03 57 56 4.6 -9 673.70 -61.8 -55.5 -61.6 59 -99 SPO 1997 04 22 03 58 55 4.8 -9 673.70 -61.8 -55.4 -61.6 58 -99 SPO 1997 04 22 03 59 55 4.8 -9 673.70 -61.8 -55.2 -61.6 58 -99 SPO 1997 04 22 04 00 54 4.9 -9 673.70 -61.8 -55.4 -61.7 58 0 SPO 1997 04 22 04 01 55 4.6 -9 673.70 -61.6 -55.4 -61.6 58 -99 SPO 1997 04 22 04 02 56 4.6 -9 673.70 -61.8 -55.4 -61.6 60 -99 SPO 1997 04 22 04 03 55 4.7 -9 673.70 -61.9 -55.4 -61.8 60 -99 SPO 1997 04 22 04 04 55 4.7 -9 673.70 -61.9 -55.3 -61.8 60 -99 SPO 1997 04 22 04 05 56 4.4 -9 673.70 -61.9 -55.4 -61.8 59 -99 SPO 1997 04 22 04 06 56 4.5 -9 673.70 -61.9 -55.5 -61.8 58 -99 SPO 1997 04 22 04 07 57 4.6 -9 673.60 -62.0 -55.6 -62.0 58 -99 SPO 1997 04 22 04 08 57 4.7 -9 673.60 -62.0 -55.6 -62.0 57 -99 SPO 1997 04 22 04 09 57 4.5 -9 673.60 -62.1 -55.4 -62.0 57 -99 SPO 1997 04 22 04 10 58 4.5 -9 673.60 -62.2 -55.5 -62.0 58 -99 SPO 1997 04 22 04 11 60 4.5 -9 673.60 -62.2 -55.8 -62.1 58 -99 SPO 1997 04 22 04 12 60 4.5 -9 673.60 -62.2 -55.8 -62.1 60 -99 SPO 1997 04 22 04 13 61 4.4 -9 673.60 -62.0 -55.6 -62.0 59 -99 SPO 1997 04 22 04 14 59 4.6 -9 673.60 -61.8 -55.5 -61.8 58 -99 SPO 1997 04 22 04 15 59 4.6 -9 673.60 -61.7 -55.4 -61.7 58 -99 SPO 1997 04 22 04 16 58 4.6 -9 673.60 -61.6 -55.4 -61.7 58 -99 SPO 1997 04 22 04 17 56 4.8 -9 673.50 -61.6 -55.4 -61.7 58 -99 SPO 1997 04 22 04 18 56 4.9 -9 673.50 -61.5 -55.4 -61.6 58 -99 SPO 1997 04 22 04 19 55 4.9 -9 673.50 -61.3 -55.3 -61.5 56 -99 SPO 1997 04 22 04 20 55 4.9 -9 673.50 -61.2 -55.2 -61.4 56 -99 SPO 1997 04 22 04 21 56 5.0 -9 673.50 -61.1 -55.2 -61.3 56 -99 SPO 1997 04 22 04 22 54 5.0 -9 673.50 -61.0 -55.3 -61.2 57 -99 SPO 1997 04 22 04 23 54 5.0 -9 673.50 -61.0 -55.3 -61.2 57 -99 SPO 1997 04 22 04 24 55 5.1 -9 673.40 -61.1 -55.3 -61.2 58 -99 SPO 1997 04 22 04 25 54 5.2 -9 673.40 -61.3 -55.3 -61.4 59 -99 SPO 1997 04 22 04 26 52 5.2 -9 673.40 -61.3 -55.1 -61.4 59 -99 SPO 1997 04 22 04 27 50 5.3 -9 673.40 -61.0 -55.2 -61.2 57 -99 SPO 1997 04 22 04 28 49 5.3 -9 673.40 -60.9 -55.2 -61.1 57 -99 SPO 1997 04 22 04 29 50 5.3 -9 673.40 -60.9 -55.0 -61.0 58 -99 SPO 1997 04 22 04 30 51 5.3 -9 673.40 -60.8 -55.1 -60.9 58 -99 SPO 1997 04 22 04 31 53 5.3 -9 673.40 -60.8 -55.1 -61.0 58 -99 SPO 1997 04 22 04 32 53 5.4 -9 673.30 -60.9 -55.1 -61.0 59 -99 SPO 1997 04 22 04 33 52 5.3 -9 673.30 -60.9 -55.1 -61.0 59 -99 SPO 1997 04 22 04 34 52 5.2 -9 673.30 -61.0 -55.1 -61.1 59 -99 SPO 1997 04 22 04 35 54 5.2 -9 673.40 -61.0 -55.2 -61.1 59 -99 SPO 1997 04 22 04 36 58 5.0 -9 673.30 -61.1 -55.3 -61.2 60 -99 SPO 1997 04 22 04 37 61 4.8 -9 673.30 -61.4 -55.4 -61.4 62 -99 SPO 1997 04 22 04 38 63 4.5 -9 673.30 -61.6 -55.5 -61.5 62 -99 SPO 1997 04 22 04 39 65 4.5 -9 673.30 -61.7 -55.5 -61.6 61 -99 SPO 1997 04 22 04 40 63 4.6 -9 673.30 -61.9 -55.6 -61.8 61 -99 SPO 1997 04 22 04 41 60 4.9 -9 673.30 -62.0 -55.5 -61.8 60 -99 SPO 1997 04 22 04 42 58 5.2 -9 673.30 -62.0 -55.3 -61.8 59 -99 SPO 1997 04 22 04 43 58 5.3 -9 673.30 -61.8 -55.1 -61.8 58 -99 SPO 1997 04 22 04 44 57 5.3 -9 673.30 -61.8 -55.2 -61.7 58 -99 SPO 1997 04 22 04 45 56 5.4 -9 673.30 -61.7 -55.3 -61.6 58 -99 SPO 1997 04 22 04 46 55 5.5 -9 673.30 -61.6 -55.2 -61.6 58 -99 SPO 1997 04 22 04 47 53 5.5 -9 673.30 -61.4 -54.9 -61.4 57 -99 SPO 1997 04 22 04 48 52 5.6 -9 673.30 -61.4 -54.8 -61.5 58 -99 SPO 1997 04 22 04 49 51 5.7 -9 673.30 -61.5 -54.9 -61.5 59 -99 SPO 1997 04 22 04 50 50 5.7 -9 673.30 -61.6 -54.8 -61.6 60 -99 SPO 1997 04 22 04 51 51 5.7 -9 673.20 -61.6 -54.8 -61.6 59 -99 SPO 1997 04 22 04 52 51 5.6 -9 673.20 -61.6 -54.8 -61.7 58 -99 SPO 1997 04 22 04 53 51 5.6 -9 673.20 -61.7 -54.9 -61.7 58 -99 SPO 1997 04 22 04 54 52 5.6 -9 673.20 -61.8 -55.0 -61.8 58 -99 SPO 1997 04 22 04 55 52 5.6 -9 673.20 -61.9 -55.0 -61.9 59 -99 SPO 1997 04 22 04 56 53 5.6 -9 673.20 -62.0 -55.1 -61.9 60 -99 SPO 1997 04 22 04 57 54 5.5 -9 673.20 -62.1 -55.2 -62.0 61 -99 SPO 1997 04 22 04 58 54 5.5 -9 673.20 -62.1 -55.2 -62.0 60 -99 SPO 1997 04 22 04 59 54 5.4 -9 673.20 -62.0 -55.2 -61.9 59 -99 SPO 1997 04 22 05 00 54 5.3 -9 673.20 -62.0 -55.2 -61.9 59 0 SPO 1997 04 22 05 01 53 5.3 -9 673.20 -62.0 -55.3 -61.9 59 -99 SPO 1997 04 22 05 02 55 5.2 -9 673.20 -61.9 -55.3 -61.9 58 -99 SPO 1997 04 22 05 03 57 5.1 -9 673.20 -61.9 -55.3 -61.9 58 -99 SPO 1997 04 22 05 04 57 5.0 -9 673.20 -61.8 -55.2 -61.9 57 -99 SPO 1997 04 22 05 05 56 5.0 -9 673.20 -61.8 -55.2 -61.8 57 -99 SPO 1997 04 22 05 06 56 5.1 -9 673.20 -61.8 -55.1 -61.8 57 -99 SPO 1997 04 22 05 07 55 5.2 -9 673.20 -61.7 -55.1 -61.9 57 -99 SPO 1997 04 22 05 08 55 5.3 -9 673.10 -61.8 -55.2 -61.9 58 -99 SPO 1997 04 22 05 09 54 5.5 -9 673.10 -61.9 -55.1 -61.9 58 -99 SPO 1997 04 22 05 10 54 5.6 -9 673.10 -61.9 -55.0 -61.9 58 -99 SPO 1997 04 22 05 11 52 5.6 -9 673.10 -61.8 -55.0 -61.9 57 -99 SPO 1997 04 22 05 12 51 5.5 -9 673.10 -61.8 -54.8 -61.8 58 -99 SPO 1997 04 22 05 13 49 5.6 -9 673.10 -61.6 -54.7 -61.7 57 -99 SPO 1997 04 22 05 14 49 5.5 -9 673.10 -61.6 -54.7 -61.7 57 -99 SPO 1997 04 22 05 15 50 5.4 -9 673.10 -61.6 -54.8 -61.7 58 -99 SPO 1997 04 22 05 16 51 5.4 -9 673.10 -61.6 -54.8 -61.7 58 -99 SPO 1997 04 22 05 17 52 5.4 -9 673.10 -61.7 -54.9 -61.8 59 -99 SPO 1997 04 22 05 18 55 5.4 -9 673.10 -61.8 -55.0 -61.8 60 -99 SPO 1997 04 22 05 19 57 5.4 -9 673.10 -62.0 -55.0 -61.9 61 -99 SPO 1997 04 22 05 20 58 5.4 -9 673.10 -62.0 -55.0 -62.0 61 -99 SPO 1997 04 22 05 21 57 5.5 -9 673.10 -62.0 -54.8 -62.1 61 -99 SPO 1997 04 22 05 22 56 5.7 -9 673.10 -62.1 -54.8 -62.1 61 -99 SPO 1997 04 22 05 23 55 5.6 -9 673.00 -62.0 -54.7 -62.1 60 -99 SPO 1997 04 22 05 24 55 5.7 -9 673.00 -62.0 -54.7 -62.1 59 -99 SPO 1997 04 22 05 25 55 5.9 -9 673.00 -62.0 -54.7 -62.0 59 -99 SPO 1997 04 22 05 26 53 6.1 -9 673.00 -61.8 -54.8 -61.8 58 -99 SPO 1997 04 22 05 27 52 6.0 -9 673.00 -61.5 -55.0 -61.6 56 -99 SPO 1997 04 22 05 28 53 6.1 -9 673.00 -61.5 -55.0 -61.6 58 -99 SPO 1997 04 22 05 29 54 6.1 -9 673.00 -61.6 -54.8 -61.7 59 -99 SPO 1997 04 22 05 30 54 6.1 -9 673.00 -61.6 -54.8 -61.7 59 -99 SPO 1997 04 22 05 31 53 6.2 -9 673.00 -61.6 -54.4 -61.6 60 -99 SPO 1997 04 22 05 32 53 6.2 -9 672.90 -61.5 -54.4 -61.6 59 -99 SPO 1997 04 22 05 33 54 6.2 -9 672.90 -61.5 -54.6 -61.6 60 -99 SPO 1997 04 22 05 34 55 6.2 -9 672.90 -61.5 -54.7 -61.6 60 -99 SPO 1997 04 22 05 35 55 6.2 -9 672.90 -61.5 -54.6 -61.6 59 -99 SPO 1997 04 22 05 36 55 6.2 -9 672.90 -61.5 -54.5 -61.6 59 -99 SPO 1997 04 22 05 37 54 6.3 -9 672.90 -61.5 -54.4 -61.6 59 -99 SPO 1997 04 22 05 38 54 6.4 -9 672.90 -61.5 -54.4 -61.6 58 -99 SPO 1997 04 22 05 39 51 6.4 -9 672.90 -61.6 -54.4 -61.7 59 -99 SPO 1997 04 22 05 40 52 6.3 -9 672.90 -61.6 -54.6 -61.7 59 -99 SPO 1997 04 22 05 41 53 6.3 -9 672.90 -61.6 -54.7 -61.8 59 -99 SPO 1997 04 22 05 42 53 6.4 -9 672.90 -61.7 -54.5 -61.7 60 -99 SPO 1997 04 22 05 43 53 6.4 -9 672.90 -61.6 -54.6 -61.7 60 -99 SPO 1997 04 22 05 44 52 6.4 -9 672.80 -61.6 -54.7 -61.7 60 -99 SPO 1997 04 22 05 45 51 6.5 -9 672.80 -61.5 -54.6 -61.6 59 -99 SPO 1997 04 22 05 46 52 6.6 -9 672.90 -61.5 -54.6 -61.6 59 -99 SPO 1997 04 22 05 47 52 6.6 -9 672.90 -61.5 -54.6 -61.6 59 -99 SPO 1997 04 22 05 48 52 6.6 -9 672.90 -61.5 -54.4 -61.6 58 -99 SPO 1997 04 22 05 49 52 6.5 -9 672.90 -61.5 -54.2 -61.6 58 -99 SPO 1997 04 22 05 50 53 6.5 -9 672.90 -61.5 -54.1 -61.6 58 -99 SPO 1997 04 22 05 51 52 6.5 -9 672.90 -61.4 -54.2 -61.5 58 -99 SPO 1997 04 22 05 52 52 6.5 -9 672.90 -61.4 -54.2 -61.5 59 -99 SPO 1997 04 22 05 53 53 6.3 -9 672.90 -61.4 -54.5 -61.5 59 -99 SPO 1997 04 22 05 54 53 6.2 -9 672.90 -61.5 -54.4 -61.6 61 -99 SPO 1997 04 22 05 55 53 5.9 -9 672.90 -61.5 -54.4 -61.6 61 -99 SPO 1997 04 22 05 56 53 5.7 -9 672.90 -61.6 -54.6 -61.7 61 -99 SPO 1997 04 22 05 57 53 5.9 -9 672.90 -61.7 -54.6 -61.7 62 -99 SPO 1997 04 22 05 58 53 6.0 -9 672.90 -61.7 -54.4 -61.7 61 -99 SPO 1997 04 22 05 59 53 6.0 -9 672.80 -61.7 -54.5 -61.7 61 -99 SPO 1997 04 22 06 00 52 6.0 -9 672.80 -61.7 -54.5 -61.7 60 0 SPO 1997 04 22 06 01 51 6.2 -9 672.80 -61.7 -54.5 -61.7 59 -99 SPO 1997 04 22 06 02 50 6.2 -9 672.80 -61.8 -54.6 -61.8 60 -99 SPO 1997 04 22 06 03 51 6.6 -9 672.80 -61.7 -54.4 -61.7 59 -99 SPO 1997 04 22 06 04 50 6.2 -9 672.80 -61.7 -54.5 -61.7 60 -99 SPO 1997 04 22 06 05 50 6.3 -9 672.80 -61.8 -54.6 -61.8 61 -99 SPO 1997 04 22 06 06 49 6.5 -9 672.80 -61.8 -54.6 -61.8 61 -99 SPO 1997 04 22 06 07 49 6.6 -9 672.80 -61.7 -54.4 -61.7 61 -99 SPO 1997 04 22 06 08 48 6.6 -9 672.70 -61.5 -54.3 -61.7 58 -99 SPO 1997 04 22 06 09 47 6.6 -9 672.80 -61.5 -54.2 -61.6 58 -99 SPO 1997 04 22 06 10 48 6.7 -9 672.80 -61.5 -54.2 -61.6 58 -99 SPO 1997 04 22 06 11 48 6.6 -9 672.70 -61.5 -54.2 -61.6 58 -99 SPO 1997 04 22 06 12 48 6.7 -9 672.70 -61.5 -54.2 -61.6 58 -99 SPO 1997 04 22 06 13 47 6.4 -9 672.70 -61.5 -54.4 -61.6 58 -99 SPO 1997 04 22 06 14 47 6.7 -9 672.70 -61.5 -54.4 -61.6 59 -99 SPO 1997 04 22 06 15 46 6.5 -9 672.70 -61.4 -54.4 -61.5 58 -99 SPO 1997 04 22 06 16 46 6.5 -9 672.70 -61.4 -54.4 -61.5 58 -99 SPO 1997 04 22 06 17 46 6.6 -9 672.70 -61.4 -54.4 -61.4 59 -99 SPO 1997 04 22 06 18 45 6.8 -9 672.60 -61.3 -54.5 -61.4 59 -99 SPO 1997 04 22 06 19 44 6.5 -9 672.60 -61.2 -54.4 -61.3 59 -99 SPO 1997 04 22 06 20 44 6.3 -9 672.60 -61.2 -54.6 -61.3 59 -99 SPO 1997 04 22 06 21 44 6.3 -9 672.60 -61.2 -54.6 -61.3 59 -99 SPO 1997 04 22 06 22 44 6.3 -9 672.60 -61.1 -54.7 -61.3 58 -99 SPO 1997 04 22 06 23 45 6.1 -9 672.60 -61.1 -54.8 -61.2 59 -99 SPO 1997 04 22 06 24 45 6.1 -9 672.60 -61.1 -54.8 -61.2 59 -99 SPO 1997 04 22 06 25 44 5.8 -9 672.60 -61.1 -54.8 -61.2 59 -99 SPO 1997 04 22 06 26 44 5.8 -9 672.60 -61.0 -54.9 -61.2 59 -99 SPO 1997 04 22 06 27 44 5.9 -9 672.60 -61.0 -55.0 -61.1 59 -99 SPO 1997 04 22 06 28 43 5.8 -9 672.60 -61.0 -55.0 -61.1 60 -99 SPO 1997 04 22 06 29 44 5.8 -9 672.60 -60.8 -55.2 -61.0 59 -99 SPO 1997 04 22 06 30 44 5.7 -9 672.60 -60.8 -55.1 -61.0 59 -99 SPO 1997 04 22 06 31 43 5.6 -9 672.60 -60.8 -55.2 -61.0 59 -99 SPO 1997 04 22 06 32 43 5.6 -9 672.60 -60.8 -55.3 -60.9 59 -99 SPO 1997 04 22 06 33 43 5.7 -9 672.60 -60.6 -55.3 -60.8 57 -99 SPO 1997 04 22 06 34 43 5.5 -9 672.60 -60.4 -55.5 -60.6 57 -99 SPO 1997 04 22 06 35 43 5.5 -9 672.60 -60.2 -55.5 -60.5 56 -99 SPO 1997 04 22 06 36 42 5.6 -9 672.60 -60.2 -55.3 -60.4 57 -99 SPO 1997 04 22 06 37 42 5.4 -9 672.60 -60.0 -55.4 -60.3 57 -99 SPO 1997 04 22 06 38 42 5.5 -9 672.60 -59.9 -55.5 -60.1 59 -99 SPO 1997 04 22 06 39 43 5.4 -9 672.60 -59.8 -55.6 -60.0 60 -99 SPO 1997 04 22 06 40 43 5.3 -9 672.60 -59.6 -55.6 -59.9 59 -99 SPO 1997 04 22 06 41 43 5.4 -9 672.60 -59.6 -55.6 -59.9 59 -99 SPO 1997 04 22 06 42 42 5.2 -9 672.60 -59.5 -55.6 -59.8 59 -99 SPO 1997 04 22 06 43 42 5.3 -9 672.60 -59.5 -55.6 -59.8 60 -99 SPO 1997 04 22 06 44 41 5.3 -9 672.60 -59.4 -55.6 -59.7 59 -99 SPO 1997 04 22 06 45 40 5.5 -9 672.60 -59.4 -55.6 -59.6 59 -99 SPO 1997 04 22 06 46 41 5.5 -9 672.60 -59.2 -55.4 -59.4 58 -99 SPO 1997 04 22 06 47 41 5.4 -9 672.70 -59.0 -55.4 -59.3 58 -99 SPO 1997 04 22 06 48 42 5.3 -9 672.70 -59.0 -55.5 -59.3 58 -99 SPO 1997 04 22 06 49 41 5.3 -9 672.70 -59.1 -55.4 -59.3 60 -99 SPO 1997 04 22 06 50 40 5.4 -9 672.70 -59.0 -55.4 -59.2 60 -99 SPO 1997 04 22 06 51 40 5.5 -9 672.70 -59.0 -55.3 -59.2 61 -99 SPO 1997 04 22 06 52 40 5.5 -9 672.60 -59.0 -55.2 -59.2 61 -99 SPO 1997 04 22 06 53 39 5.6 -9 672.60 -58.9 -55.1 -59.1 61 -99 SPO 1997 04 22 06 54 40 5.8 -9 672.60 -58.9 -55.0 -59.1 61 -99 SPO 1997 04 22 06 55 40 6.0 -9 672.60 -58.9 -55.1 -59.1 61 -99 SPO 1997 04 22 06 56 41 6.0 -9 672.60 -58.8 -55.0 -59.0 59 -99 SPO 1997 04 22 06 57 40 5.9 -9 672.60 -58.8 -55.1 -59.0 59 -99 SPO 1997 04 22 06 58 40 6.0 -9 672.60 -58.8 -55.1 -59.0 59 -99 SPO 1997 04 22 06 59 39 6.2 -9 672.60 -58.8 -55.0 -58.9 60 -99 SPO 1997 04 22 07 00 39 6.0 -9 672.60 -58.6 -54.9 -58.8 59 0 SPO 1997 04 22 07 01 40 6.0 -9 672.60 -58.7 -55.0 -58.8 61 -99 SPO 1997 04 22 07 02 42 6.1 -9 672.60 -58.7 -55.0 -58.8 61 -99 SPO 1997 04 22 07 03 42 6.1 -9 672.50 -58.7 -54.8 -58.8 61 -99 SPO 1997 04 22 07 04 43 6.1 -9 672.50 -58.8 -55.0 -58.9 62 -99 SPO 1997 04 22 07 05 43 6.1 -9 672.50 -58.8 -55.0 -58.9 62 -99 SPO 1997 04 22 07 06 41 5.9 -9 672.50 -59.0 -55.2 -59.0 63 -99 SPO 1997 04 22 07 07 41 6.0 -9 672.50 -59.0 -54.9 -59.1 62 -99 SPO 1997 04 22 07 08 40 5.9 -9 672.50 -59.0 -54.6 -59.1 62 -99 SPO 1997 04 22 07 09 40 5.7 -9 672.50 -59.0 -55.0 -59.1 61 -99 SPO 1997 04 22 07 10 42 6.0 -9 672.50 -59.1 -55.0 -59.1 62 -99 SPO 1997 04 22 07 11 43 5.8 -9 672.50 -59.0 -55.1 -59.1 62 -99 SPO 1997 04 22 07 12 43 5.5 -9 672.50 -59.0 -55.2 -59.1 62 -99 SPO 1997 04 22 07 13 45 5.5 -9 672.50 -58.9 -55.2 -59.0 61 -99 SPO 1997 04 22 07 14 45 5.4 -9 672.50 -59.2 -55.2 -59.2 64 -99 SPO 1997 04 22 07 15 44 5.3 -9 672.50 -59.4 -55.2 -59.4 65 -99 SPO 1997 04 22 07 16 44 5.2 -9 672.50 -59.5 -55.1 -59.5 64 -99 SPO 1997 04 22 07 17 48 4.9 -9 672.60 -59.6 -55.4 -59.5 64 -99 SPO 1997 04 22 07 18 50 4.5 -9 672.60 -59.8 -55.7 -59.7 64 -99 SPO 1997 04 22 07 19 54 4.3 -9 672.60 -60.0 -56.1 -59.8 65 -99 SPO 1997 04 22 07 20 53 4.4 -9 672.60 -60.3 -56.2 -60.0 65 -99 SPO 1997 04 22 07 21 54 4.3 -9 672.60 -60.5 -56.3 -60.2 65 -99 SPO 1997 04 22 07 22 53 3.9 -9 672.60 -60.6 -56.3 -60.3 65 -99 SPO 1997 04 22 07 23 52 4.0 -9 672.60 -60.8 -56.3 -60.4 65 -99 SPO 1997 04 22 07 24 52 3.9 -9 672.60 -60.9 -56.1 -60.6 66 -99 SPO 1997 04 22 07 25 57 3.8 -9 672.60 -61.1 -56.4 -60.6 66 -99 SPO 1997 04 22 07 26 57 3.7 -9 672.60 -61.5 -56.5 -60.9 67 -99 SPO 1997 04 22 07 27 56 3.8 -9 672.50 -61.8 -56.7 -61.2 67 -99 SPO 1997 04 22 07 28 52 4.1 -9 672.50 -61.8 -56.7 -61.2 65 -99 SPO 1997 04 22 07 29 51 4.5 -9 672.50 -61.4 -56.5 -61.1 61 -99 SPO 1997 04 22 07 30 51 4.4 -9 672.50 -61.3 -56.4 -61.0 61 -99 SPO 1997 04 22 07 31 53 4.4 -9 672.50 -61.2 -56.3 -61.0 60 -99 SPO 1997 04 22 07 32 54 4.5 -9 672.50 -61.2 -56.5 -61.0 61 -99 SPO 1997 04 22 07 33 56 4.5 -9 672.50 -61.1 -56.5 -61.0 61 -99 SPO 1997 04 22 07 34 54 4.8 -9 672.50 -61.1 -56.4 -61.0 61 -99 SPO 1997 04 22 07 35 51 4.9 -9 672.50 -61.1 -56.1 -61.0 61 -99 SPO 1997 04 22 07 36 50 5.1 -9 672.50 -61.0 -56.0 -61.0 61 -99 SPO 1997 04 22 07 37 51 4.8 -9 672.50 -61.0 -55.8 -61.0 62 -99 SPO 1997 04 22 07 38 52 4.5 -9 672.50 -61.1 -56.1 -61.1 62 -99 SPO 1997 04 22 07 39 54 4.4 -9 672.50 -61.2 -56.1 -61.2 62 -99 SPO 1997 04 22 07 40 55 4.1 -9 672.50 -61.4 -56.4 -61.2 62 -99 SPO 1997 04 22 07 41 55 4.0 -9 672.50 -61.4 -56.4 -61.3 62 -99 SPO 1997 04 22 07 42 55 3.9 -9 672.50 -61.4 -56.3 -61.4 60 -99 SPO 1997 04 22 07 43 57 3.6 -9 672.50 -61.4 -56.6 -61.4 59 -99 SPO 1997 04 22 07 44 59 3.4 -9 672.50 -61.6 -56.8 -61.5 61 -99 SPO 1997 04 22 07 45 62 3.4 -9 672.50 -61.8 -57.1 -61.6 62 -99 SPO 1997 04 22 07 46 62 3.5 -9 672.50 -61.9 -57.2 -61.7 62 -99 SPO 1997 04 22 07 47 59 3.5 -9 672.50 -62.6 -57.1 -62.0 67 -99 SPO 1997 04 22 07 48 56 3.7 -9 672.50 -63.1 -57.0 -62.3 69 -99 SPO 1997 04 22 07 49 53 3.9 -9 672.50 -63.1 -56.8 -62.4 65 -99 SPO 1997 04 22 07 50 52 4.0 -9 672.50 -62.9 -56.6 -62.4 61 -99 SPO 1997 04 22 07 51 51 3.9 -9 672.50 -62.8 -56.6 -62.4 60 -99 SPO 1997 04 22 07 52 51 4.0 -9 672.50 -63.0 -56.6 -62.5 60 -99 SPO 1997 04 22 07 53 51 4.0 -9 672.50 -63.0 -56.6 -62.5 59 -99 SPO 1997 04 22 07 54 53 4.2 -9 672.50 -63.0 -56.6 -62.6 58 -99 SPO 1997 04 22 07 55 54 4.1 -9 672.40 -63.0 -56.7 -62.6 58 -99 SPO 1997 04 22 07 56 55 4.0 -9 672.40 -63.1 -56.8 -62.7 58 -99 SPO 1997 04 22 07 57 57 3.8 -9 672.40 -63.3 -56.9 -62.8 60 -99 SPO 1997 04 22 07 58 60 3.6 -9 672.40 -63.4 -57.0 -63.0 59 -99 SPO 1997 04 22 07 59 64 3.4 -9 672.40 -63.6 -57.2 -63.2 59 -99 SPO 1997 04 22 08 00 66 3.5 -9 672.40 -64.0 -57.3 -63.4 61 0 SPO 1997 04 22 08 01 63 3.8 -9 672.40 -64.0 -57.2 -63.5 59 -99 SPO 1997 04 22 08 02 60 4.0 -9 672.40 -63.7 -56.9 -63.4 56 -99 SPO 1997 04 22 08 03 57 4.1 -9 672.40 -63.4 -56.7 -63.2 54 -99 SPO 1997 04 22 08 04 55 4.2 -9 672.40 -63.1 -56.5 -63.1 53 -99 SPO 1997 04 22 08 05 54 4.2 -9 672.40 -63.0 -56.5 -63.0 53 -99 SPO 1997 04 22 08 06 59 3.8 -9 672.40 -63.1 -56.4 -63.0 54 -99 SPO 1997 04 22 08 07 70 3.2 -9 672.50 -63.4 -56.7 -63.2 57 -99 SPO 1997 04 22 08 08 87 2.6 -9 672.50 -64.0 -57.5 -63.6 60 -99 SPO 1997 04 22 08 09 97 2.5 -9 672.50 -64.2 -58.1 -63.9 60 -99 SPO 1997 04 22 08 10 86 2.9 -9 672.50 -63.9 -58.0 -63.7 56 -99 SPO 1997 04 22 08 11 74 3.2 -9 672.50 -63.1 -57.5 -63.3 52 -99 SPO 1997 04 22 08 12 67 3.5 -9 672.40 -62.4 -57.0 -62.8 50 -99 SPO 1997 04 22 08 13 69 3.6 -9 672.40 -62.5 -56.6 -62.7 52 -99 SPO 1997 04 22 08 14 72 3.5 -9 672.40 -62.8 -57.0 -62.8 54 -99 SPO 1997 04 22 08 15 74 3.6 -9 672.40 -63.6 -57.3 -63.3 59 -99 SPO 1997 04 22 08 16 73 3.5 -9 672.40 -63.8 -57.4 -63.6 58 -99 SPO 1997 04 22 08 17 71 3.8 -9 672.40 -63.8 -57.4 -63.6 56 -99 SPO 1997 04 22 08 18 71 3.9 -9 672.40 -63.6 -57.2 -63.5 54 -99 SPO 1997 04 22 08 19 73 3.9 -9 672.20 -63.4 -57.2 -63.4 54 -99 SPO 1997 04 22 08 20 74 3.8 -9 672.20 -63.3 -57.2 -63.4 54 -99 SPO 1997 04 22 08 21 73 4.0 -9 672.20 -63.2 -57.3 -63.3 54 -99 SPO 1997 04 22 08 22 71 4.2 -9 672.20 -63.0 -57.0 -63.2 54 -99 SPO 1997 04 22 08 23 70 4.2 -9 672.20 -62.9 -56.9 -63.1 54 -99 SPO 1997 04 22 08 24 69 4.5 -9 672.20 -62.8 -56.8 -63.0 54 -99 SPO 1997 04 22 08 25 69 4.6 -9 672.20 -62.7 -56.7 -62.9 53 -99 SPO 1997 04 22 08 26 68 4.7 -9 672.20 -62.7 -56.7 -62.9 53 -99 SPO 1997 04 22 08 27 67 4.7 -9 672.20 -62.7 -56.5 -62.9 52 -99 SPO 1997 04 22 08 28 68 4.5 -9 672.20 -62.8 -56.4 -63.0 53 -99 SPO 1997 04 22 08 29 71 4.5 -9 672.20 -63.0 -56.4 -63.1 54 -99 SPO 1997 04 22 08 30 74 4.5 -9 672.20 -63.1 -56.7 -63.2 55 -99 SPO 1997 04 22 08 31 73 4.4 -9 672.20 -63.2 -56.9 -63.2 55 -99 SPO 1997 04 22 08 32 72 4.6 -9 672.20 -63.2 -56.7 -63.2 55 -99 SPO 1997 04 22 08 33 71 4.6 -9 672.20 -63.1 -56.5 -63.2 55 -99 SPO 1997 04 22 08 34 71 4.6 -9 672.20 -63.0 -56.6 -63.2 54 -99 SPO 1997 04 22 08 35 70 4.7 -9 672.20 -63.0 -56.7 -63.1 54 -99 SPO 1997 04 22 08 36 72 4.5 -9 672.20 -62.8 -56.8 -63.0 53 -99 SPO 1997 04 22 08 37 71 4.4 -9 672.20 -62.7 -56.9 -63.0 52 -99 SPO 1997 04 22 08 38 69 4.8 -9 672.20 -62.6 -56.7 -62.8 52 -99 SPO 1997 04 22 08 39 69 4.9 -9 672.20 -62.5 -56.6 -62.8 52 -99 SPO 1997 04 22 08 40 69 4.7 -9 672.20 -62.6 -56.8 -62.8 53 -99 SPO 1997 04 22 08 41 69 4.7 -9 672.20 -62.5 -56.7 -62.8 54 -99 SPO 1997 04 22 08 42 70 4.4 -9 672.20 -62.2 -57.0 -62.6 53 -99 SPO 1997 04 22 08 43 70 4.5 -9 672.20 -61.9 -56.9 -62.4 52 -99 SPO 1997 04 22 08 44 76 4.5 -9 672.20 -61.7 -56.4 -62.2 52 -99 SPO 1997 04 22 08 45 76 3.5 -9 672.20 -62.2 -56.5 -62.4 56 -99 SPO 1997 04 22 08 46 82 3.5 -9 672.20 -62.6 -57.7 -62.7 58 -99 SPO 1997 04 22 08 47 82 3.9 -9 672.20 -62.8 -57.1 -62.9 57 -99 SPO 1997 04 22 08 48 75 4.1 -9 672.20 -62.8 -56.8 -62.8 56 -99 SPO 1997 04 22 08 49 75 4.0 -9 672.20 -62.6 -57.2 -62.8 55 -99 SPO 1997 04 22 08 50 77 4.1 -9 672.20 -62.6 -57.4 -62.7 55 -99 SPO 1997 04 22 08 51 80 4.4 -9 672.20 -62.8 -56.6 -62.8 57 -99 SPO 1997 04 22 08 52 80 4.2 -9 672.20 -63.2 -56.9 -63.0 58 -99 SPO 1997 04 22 08 53 85 4.2 -9 672.20 -63.6 -57.3 -63.4 60 -99 SPO 1997 04 22 08 54 90 4.2 -9 672.20 -64.1 -57.0 -63.7 61 -99 SPO 1997 04 22 08 55 88 4.2 -9 672.20 -64.2 -57.3 -63.9 60 -99 SPO 1997 04 22 08 56 84 4.2 -9 672.20 -64.3 -57.3 -63.9 59 -99 SPO 1997 04 22 08 57 78 4.1 -9 672.20 -64.2 -57.1 -63.9 57 -99 SPO 1997 04 22 08 58 79 3.7 -9 672.20 -64.1 -57.2 -63.8 56 -99 SPO 1997 04 22 08 59 83 3.6 -9 672.20 -64.3 -56.9 -64.0 56 -99 SPO 1997 04 22 09 00 80 3.9 -9 672.20 -64.8 -57.0 -64.2 58 0 SPO 1997 04 22 09 01 84 3.6 -9 672.20 -65.0 -57.4 -64.4 58 -99 SPO 1997 04 22 09 02 83 4.1 -9 672.20 -64.8 -57.2 -64.4 55 -99 SPO 1997 04 22 09 03 80 4.3 -9 672.20 -64.4 -56.8 -64.2 53 -99 SPO 1997 04 22 09 04 81 4.0 -9 672.20 -64.3 -56.9 -64.1 53 -99 SPO 1997 04 22 09 05 83 3.9 -9 672.20 -64.6 -57.1 -64.2 55 -99 SPO 1997 04 22 09 06 85 3.7 -9 672.20 -64.7 -57.3 -64.4 55 -99 SPO 1997 04 22 09 07 88 4.0 -9 672.20 -64.6 -57.0 -64.4 54 -99 SPO 1997 04 22 09 08 91 3.9 -9 672.20 -64.4 -56.6 -64.2 53 -99 SPO 1997 04 22 09 09 89 3.9 -9 672.20 -64.4 -56.4 -64.3 53 -99 SPO 1997 04 22 09 10 92 3.8 -9 672.20 -64.2 -56.6 -64.2 52 -99 SPO 1997 04 22 09 11 97 3.4 -9 672.20 -63.9 -57.2 -64.1 51 -99 SPO 1997 04 22 09 12 99 3.5 -9 672.20 -63.0 -57.2 -63.6 48 -99 SPO 1997 04 22 09 13 100 3.5 -9 672.20 -62.6 -57.2 -63.2 47 -99 SPO 1997 04 22 09 14 100 3.5 -9 672.20 -62.6 -57.4 -63.1 49 -99 SPO 1997 04 22 09 15 101 3.4 -9 672.20 -62.5 -57.6 -63.1 49 -99 SPO 1997 04 22 09 16 99 3.4 -9 672.20 -62.2 -57.7 -62.9 49 -99 SPO 1997 04 22 09 17 96 3.5 -9 672.20 -62.6 -57.7 -63.0 53 -99 SPO 1997 04 22 09 18 91 3.4 -9 672.20 -63.0 -57.6 -63.2 56 -99 SPO 1997 04 22 09 19 90 3.5 -9 672.20 -63.1 -57.4 -63.3 54 -99 SPO 1997 04 22 09 20 89 3.6 -9 672.20 -63.0 -57.3 -63.2 53 -99 SPO 1997 04 22 09 21 90 3.5 -9 672.20 -63.0 -57.2 -63.1 53 -99 SPO 1997 04 22 09 22 92 3.5 -9 672.20 -63.2 -57.2 -63.2 54 -99 SPO 1997 04 22 09 23 93 3.4 -9 672.20 -63.7 -57.0 -63.5 56 -99 SPO 1997 04 22 09 24 94 3.5 -9 672.10 -63.6 -57.2 -63.5 54 -99 SPO 1997 04 22 09 25 95 3.6 -9 672.10 -63.6 -57.3 -63.5 54 -99 SPO 1997 04 22 09 26 96 3.7 -9 672.20 -63.7 -57.3 -63.5 54 -99 SPO 1997 04 22 09 27 96 3.7 -9 672.20 -63.8 -57.2 -63.6 55 -99 SPO 1997 04 22 09 28 96 3.7 -9 672.20 -64.1 -57.2 -63.8 56 -99 SPO 1997 04 22 09 29 95 3.7 -9 672.10 -64.1 -57.3 -63.8 56 -99 SPO 1997 04 22 09 30 94 3.7 -9 672.10 -64.0 -57.3 -63.8 55 -99 SPO 1997 04 22 09 31 93 3.9 -9 672.10 -64.0 -57.4 -63.8 55 -99 SPO 1997 04 22 09 32 92 3.8 -9 672.10 -64.1 -57.5 -63.9 56 -99 SPO 1997 04 22 09 33 91 3.9 -9 672.10 -64.4 -57.7 -64.0 57 -99 SPO 1997 04 22 09 34 92 4.0 -9 672.10 -64.6 -57.6 -64.2 57 -99 SPO 1997 04 22 09 35 91 4.2 -9 672.10 -64.6 -57.7 -64.3 56 -99 SPO 1997 04 22 09 36 90 4.2 -9 672.00 -64.3 -57.6 -64.1 53 -99 SPO 1997 04 22 09 37 88 4.2 -9 672.00 -64.2 -57.5 -64.0 53 -99 SPO 1997 04 22 09 38 87 4.2 -9 672.00 -64.0 -57.6 -64.0 51 -99 SPO 1997 04 22 09 39 89 4.2 -9 672.10 -63.9 -57.4 -63.9 52 -99 SPO 1997 04 22 09 40 88 4.2 -9 672.00 -63.8 -57.3 -63.8 52 -99 SPO 1997 04 22 09 41 87 4.5 -9 672.10 -63.7 -57.2 -63.8 52 -99 SPO 1997 04 22 09 42 89 4.5 -9 672.10 -63.7 -57.2 -63.7 53 -99 SPO 1997 04 22 09 43 89 4.3 -9 672.00 -63.9 -57.3 -63.8 53 -99 SPO 1997 04 22 09 44 86 4.5 -9 672.00 -64.0 -57.4 -64.0 53 -99 SPO 1997 04 22 09 45 83 4.5 -9 672.00 -63.9 -57.3 -63.9 53 -99 SPO 1997 04 22 09 46 80 4.6 -9 672.00 -63.7 -57.2 -63.8 51 -99 SPO 1997 04 22 09 47 75 4.6 -9 672.00 -63.6 -57.0 -63.7 51 -99 SPO 1997 04 22 09 48 77 4.6 -9 672.00 -63.5 -56.9 -63.6 51 -99 SPO 1997 04 22 09 49 79 4.4 -9 672.00 -63.4 -57.2 -63.5 52 -99 SPO 1997 04 22 09 50 83 4.4 -9 671.90 -63.6 -57.2 -63.6 54 -99 SPO 1997 04 22 09 51 83 4.4 -9 672.00 -63.8 -57.6 -63.8 55 -99 SPO 1997 04 22 09 52 80 4.3 -9 672.00 -63.9 -57.6 -63.8 56 -99 SPO 1997 04 22 09 53 78 4.3 -9 672.00 -63.8 -57.3 -63.8 55 -99 SPO 1997 04 22 09 54 78 4.4 -9 671.90 -63.8 -57.4 -63.8 55 -99 SPO 1997 04 22 09 55 79 4.1 -9 671.90 -63.9 -57.3 -63.8 55 -99 SPO 1997 04 22 09 56 79 4.0 -9 671.90 -64.1 -57.4 -64.0 56 -99 SPO 1997 04 22 09 57 78 4.1 -9 671.90 -64.3 -57.4 -64.1 56 -99 SPO 1997 04 22 09 58 76 4.3 -9 671.90 -64.1 -57.4 -64.1 53 -99 SPO 1997 04 22 09 59 76 4.6 -9 671.90 -63.9 -57.3 -64.0 51 -99 SPO 1997 04 22 10 00 76 4.8 -9 671.90 -63.9 -57.5 -63.9 52 0 SPO 1997 04 22 10 01 77 4.8 -9 671.90 -63.8 -57.3 -63.9 52 -99 SPO 1997 04 22 10 02 78 4.4 -9 671.90 -64.0 -57.6 -64.0 53 -99 SPO 1997 04 22 10 03 82 4.1 -9 671.90 -64.2 -57.9 -64.2 55 -99 SPO 1997 04 22 10 04 86 4.1 -9 672.00 -64.5 -58.2 -64.3 56 -99 SPO 1997 04 22 10 05 88 4.4 -9 672.00 -64.3 -57.8 -64.2 54 -99 SPO 1997 04 22 10 06 85 4.4 -9 671.90 -64.0 -58.2 -64.0 53 -99 SPO 1997 04 22 10 07 83 4.2 -9 671.90 -63.9 -58.1 -63.9 53 -99 SPO 1997 04 22 10 08 83 4.2 -9 672.00 -64.0 -58.6 -64.0 53 -99 SPO 1997 04 22 10 09 86 4.2 -9 672.00 -64.3 -58.3 -64.1 54 -99 SPO 1997 04 22 10 10 85 3.9 -9 671.90 -64.8 -58.5 -64.4 55 -99 SPO 1997 04 22 10 11 85 4.2 -9 671.90 -64.5 -58.6 -64.4 53 -99 SPO 1997 04 22 10 12 86 4.2 -9 671.90 -64.0 -58.4 -64.1 50 -99 SPO 1997 04 22 10 13 85 4.2 -9 671.90 -63.8 -58.3 -64.0 49 -99 SPO 1997 04 22 10 14 83 4.2 -9 671.90 -63.9 -58.5 -63.9 51 -99 SPO 1997 04 22 10 15 83 4.3 -9 671.90 -64.0 -58.4 -64.0 53 -99 SPO 1997 04 22 10 16 83 4.7 -9 671.90 -64.1 -58.2 -64.0 54 -99 SPO 1997 04 22 10 17 83 3.9 -9 671.90 -64.8 -58.3 -64.4 58 -99 SPO 1997 04 22 10 18 88 3.9 -9 671.90 -65.0 -58.7 -64.6 57 -99 SPO 1997 04 22 10 19 87 4.3 -9 671.90 -64.7 -58.8 -64.6 54 -99 SPO 1997 04 22 10 20 85 4.6 -9 671.80 -64.4 -58.7 -64.4 53 -99 SPO 1997 04 22 10 21 83 4.8 -9 671.90 -64.3 -58.6 -64.3 52 -99 SPO 1997 04 22 10 22 83 4.8 -9 671.90 -64.2 -58.5 -64.3 51 -99 SPO 1997 04 22 10 23 85 4.5 -9 671.90 -64.4 -58.4 -64.4 53 -99 SPO 1997 04 22 10 24 85 4.2 -9 671.80 -64.8 -58.5 -64.6 55 -99 SPO 1997 04 22 10 25 85 4.4 -9 671.90 -65.1 -58.5 -64.8 56 -99 SPO 1997 04 22 10 26 81 4.4 -9 671.80 -65.2 -58.4 -65.0 55 -99 SPO 1997 04 22 10 27 80 4.2 -9 671.80 -65.3 -58.4 -65.0 55 -99 SPO 1997 04 22 10 28 84 4.7 -9 671.80 -65.2 -58.2 -65.0 54 -99 SPO 1997 04 22 10 29 85 4.8 -9 671.80 -64.9 -58.0 -64.8 52 -99 SPO 1997 04 22 10 30 81 4.2 -9 671.80 -65.0 -58.2 -64.8 53 -99 SPO 1997 04 22 10 31 84 4.0 -9 671.80 -65.2 -58.4 -65.0 54 -99 SPO 1997 04 22 10 32 89 4.3 -9 671.80 -65.2 -58.5 -65.1 54 -99 SPO 1997 04 22 10 33 87 4.2 -9 671.80 -65.2 -58.6 -65.1 53 -99 SPO 1997 04 22 10 34 86 4.2 -9 671.80 -65.4 -58.5 -65.2 55 -99 SPO 1997 04 22 10 35 87 4.3 -9 671.80 -65.4 -58.4 -65.2 54 -99 SPO 1997 04 22 10 36 87 4.2 -9 671.80 -65.6 -58.3 -65.3 55 -99 SPO 1997 04 22 10 37 85 4.3 -9 671.70 -65.6 -58.2 -65.4 54 -99 SPO 1997 04 22 10 38 83 4.4 -9 671.70 -65.4 -58.2 -65.3 52 -99 SPO 1997 04 22 10 39 84 4.3 -9 671.70 -65.4 -58.2 -65.2 52 -99 SPO 1997 04 22 10 40 85 3.8 -9 671.70 -65.7 -58.3 -65.4 54 -99 SPO 1997 04 22 10 41 87 4.1 -9 671.80 -65.8 -58.3 -65.6 54 -99 SPO 1997 04 22 10 42 86 4.4 -9 671.80 -65.7 -58.2 -65.6 53 -99 SPO 1997 04 22 10 43 85 4.4 -9 671.80 -65.6 -58.2 -65.5 52 -99 SPO 1997 04 22 10 44 85 4.4 -9 671.80 -65.6 -58.2 -65.4 52 -99 SPO 1997 04 22 10 45 84 4.4 -9 671.70 -65.7 -58.3 -65.5 52 -99 SPO 1997 04 22 10 46 83 4.8 -9 671.70 -65.7 -58.2 -65.6 52 -99 SPO 1997 04 22 10 47 80 4.7 -9 671.60 -65.7 -58.2 -65.6 52 -99 SPO 1997 04 22 10 48 79 4.8 -9 671.70 -65.7 -58.1 -65.6 52 -99 SPO 1997 04 22 10 49 79 4.7 -9 671.60 -65.6 -58.1 -65.6 52 -99 SPO 1997 04 22 10 50 80 4.6 -9 671.60 -65.4 -58.0 -65.5 51 -99 SPO 1997 04 22 10 51 81 4.6 -9 671.70 -65.3 -58.0 -65.4 51 -99 SPO 1997 04 22 10 52 80 4.5 -9 671.70 -65.3 -58.0 -65.4 52 -99 SPO 1997 04 22 10 53 80 4.3 -9 671.60 -65.4 -58.0 -65.4 52 -99 SPO 1997 04 22 10 54 79 4.2 -9 671.60 -65.6 -58.0 -65.6 53 -99 SPO 1997 04 22 10 55 79 4.1 -9 671.60 -65.9 -58.0 -65.7 54 -99 SPO 1997 04 22 10 56 81 4.2 -9 671.60 -65.7 -58.0 -65.7 52 -99 SPO 1997 04 22 10 57 82 4.4 -9 671.60 -65.3 -58.0 -65.4 49 -99 SPO 1997 04 22 10 58 80 4.5 -9 671.60 -65.2 -57.9 -65.3 50 -99 SPO 1997 04 22 10 59 79 4.7 -9 671.60 -65.2 -58.0 -65.2 50 -99 SPO 1997 04 22 11 00 80 4.5 -9 671.60 -65.2 -58.0 -65.2 50 0 SPO 1997 04 22 11 01 81 4.4 -9 671.60 -65.2 -57.9 -65.2 50 -99 SPO 1997 04 22 11 02 81 4.4 -9 671.60 -65.2 -57.9 -65.2 51 -99 SPO 1997 04 22 11 03 82 4.3 -9 671.60 -65.2 -57.9 -65.2 52 -99 SPO 1997 04 22 11 04 80 4.3 -9 671.60 -65.0 -57.9 -65.2 51 -99 SPO 1997 04 22 11 05 77 4.6 -9 671.50 -64.8 -57.8 -65.0 50 -99 SPO 1997 04 22 11 06 75 4.8 -9 671.60 -64.6 -57.7 -64.9 49 -99 SPO 1997 04 22 11 07 76 4.8 -9 671.60 -64.6 -57.7 -64.8 50 -99 SPO 1997 04 22 11 08 76 4.8 -9 671.60 -64.4 -57.7 -64.7 49 -99 SPO 1997 04 22 11 09 76 4.7 -9 671.60 -64.2 -57.7 -64.6 49 -99 SPO 1997 04 22 11 10 76 4.6 -9 671.60 -64.3 -57.8 -64.6 50 -99 SPO 1997 04 22 11 11 76 4.5 -9 671.60 -64.3 -57.8 -64.6 51 -99 SPO 1997 04 22 11 12 75 4.4 -9 671.60 -64.4 -57.8 -64.7 51 -99 SPO 1997 04 22 11 13 76 4.2 -9 671.60 -64.5 -57.9 -64.7 52 -99 SPO 1997 04 22 11 14 80 4.0 -9 671.60 -64.7 -58.0 -64.8 53 -99 SPO 1997 04 22 11 15 83 4.0 -9 671.60 -64.7 -58.1 -64.8 53 -99 SPO 1997 04 22 11 16 83 4.2 -9 671.60 -64.4 -58.1 -64.7 51 -99 SPO 1997 04 22 11 17 82 4.3 -9 671.60 -64.4 -58.0 -64.6 51 -99 SPO 1997 04 22 11 18 82 4.4 -9 671.60 -64.3 -58.0 -64.5 51 -99 SPO 1997 04 22 11 19 83 4.5 -9 671.60 -64.3 -58.0 -64.4 51 -99 SPO 1997 04 22 11 20 82 4.5 -9 671.60 -64.3 -58.0 -64.4 51 -99 SPO 1997 04 22 11 21 83 4.4 -9 671.60 -64.4 -58.1 -64.5 52 -99 SPO 1997 04 22 11 22 83 4.3 -9 671.60 -64.6 -58.2 -64.6 53 -99 SPO 1997 04 22 11 23 83 4.2 -9 671.60 -65.0 -58.2 -64.8 55 -99 SPO 1997 04 22 11 24 85 4.3 -9 671.60 -65.2 -58.3 -65.0 55 -99 SPO 1997 04 22 11 25 84 4.4 -9 671.60 -64.8 -58.2 -64.8 53 -99 SPO 1997 04 22 11 26 82 4.5 -9 671.50 -65.2 -58.3 -65.0 55 -99 SPO 1997 04 22 11 27 81 4.6 -9 671.50 -65.2 -58.2 -65.0 54 -99 SPO 1997 04 22 11 28 82 4.5 -9 671.50 -65.2 -58.1 -65.0 53 -99 SPO 1997 04 22 11 29 84 4.5 -9 671.50 -65.3 -58.1 -65.1 54 -99 SPO 1997 04 22 11 30 86 4.3 -9 671.50 -65.3 -58.2 -65.1 53 -99 SPO 1997 04 22 11 31 86 4.4 -9 671.50 -65.4 -58.3 -65.2 53 -99 SPO 1997 04 22 11 32 85 4.4 -9 671.50 -65.4 -58.2 -65.2 53 -99 SPO 1997 04 22 11 33 86 4.4 -9 671.50 -65.3 -58.1 -65.2 52 -99 SPO 1997 04 22 11 34 87 4.3 -9 671.50 -65.4 -58.2 -65.2 53 -99 SPO 1997 04 22 11 35 88 4.5 -9 671.50 -65.6 -58.4 -65.3 55 -99 SPO 1997 04 22 11 36 88 4.5 -9 671.50 -65.6 -58.4 -65.4 54 -99 SPO 1997 04 22 11 37 85 4.7 -9 671.50 -65.4 -58.2 -65.2 53 -99 SPO 1997 04 22 11 38 84 4.8 -9 671.40 -65.0 -58.1 -65.0 51 -99 SPO 1997 04 22 11 39 86 4.7 -9 671.50 -64.9 -58.0 -64.9 52 -99 SPO 1997 04 22 11 40 86 4.7 -9 671.50 -65.2 -58.0 -65.0 53 -99 SPO 1997 04 22 11 41 82 4.8 -9 671.50 -65.3 -58.0 -65.1 53 -99 SPO 1997 04 22 11 42 82 4.8 -9 671.40 -65.3 -58.0 -65.1 52 -99 SPO 1997 04 22 11 43 83 4.8 -9 671.50 -65.2 -58.0 -65.1 52 -99 SPO 1997 04 22 11 44 83 4.8 -9 671.40 -65.3 -58.0 -65.2 52 -99 SPO 1997 04 22 11 45 82 4.6 -9 671.40 -65.3 -58.1 -65.2 52 -99 SPO 1997 04 22 11 46 82 4.7 -9 671.40 -65.3 -58.0 -65.2 53 -99 SPO 1997 04 22 11 47 82 4.6 -9 671.40 -65.2 -58.1 -65.1 52 -99 SPO 1997 04 22 11 48 82 4.7 -9 671.40 -65.2 -58.1 -65.1 52 -99 SPO 1997 04 22 11 49 81 4.6 -9 671.40 -65.1 -58.1 -65.1 52 -99 SPO 1997 04 22 11 50 81 4.4 -9 671.40 -65.1 -58.2 -65.1 52 -99 SPO 1997 04 22 11 51 81 4.5 -9 671.40 -65.2 -58.2 -65.2 53 -99 SPO 1997 04 22 11 52 80 4.6 -9 671.40 -65.2 -58.2 -65.2 52 -99 SPO 1997 04 22 11 53 79 4.7 -9 671.40 -65.2 -58.2 -65.2 52 -99 SPO 1997 04 22 11 54 79 4.9 -9 671.40 -65.2 -58.2 -65.1 52 -99 SPO 1997 04 22 11 55 79 5.0 -9 671.40 -65.2 -58.2 -65.1 52 -99 SPO 1997 04 22 11 56 80 5.0 -9 671.40 -65.3 -58.2 -65.1 52 -99 SPO 1997 04 22 11 57 82 4.8 -9 671.40 -65.3 -58.3 -65.1 53 -99 SPO 1997 04 22 11 58 85 4.6 -9 671.40 -65.3 -58.4 -65.1 53 -99 SPO 1997 04 22 11 59 85 4.6 -9 671.40 -65.3 -58.4 -65.2 53 -99 SPO 1997 04 22 12 00 85 4.7 -9 671.40 -65.3 -58.2 -65.2 53 0 SPO 1997 04 22 12 01 84 4.8 -9 671.40 -65.4 -58.2 -65.2 54 -99 SPO 1997 04 22 12 02 82 4.8 -9 671.40 -65.5 -58.3 -65.3 55 -99 SPO 1997 04 22 12 03 82 4.7 -9 671.40 -65.4 -58.2 -65.3 53 -99 SPO 1997 04 22 12 04 84 4.5 -9 671.40 -65.4 -58.3 -65.3 52 -99 SPO 1997 04 22 12 05 84 4.5 -9 671.40 -65.6 -58.4 -65.4 53 -99 SPO 1997 04 22 12 06 81 4.6 -9 671.40 -65.6 -58.4 -65.4 52 -99 SPO 1997 04 22 12 07 80 4.7 -9 671.40 -65.4 -58.2 -65.2 51 -99 SPO 1997 04 22 12 08 81 4.6 -9 671.50 -65.3 -58.2 -65.2 51 -99 SPO 1997 04 22 12 09 82 4.5 -9 671.40 -65.4 -58.2 -65.2 52 -99 SPO 1997 04 22 12 10 82 4.6 -9 671.40 -65.6 -58.2 -65.3 53 -99 SPO 1997 04 22 12 11 81 4.7 -9 671.40 -65.5 -58.2 -65.3 52 -99 SPO 1997 04 22 12 12 81 4.5 -9 671.40 -65.6 -58.2 -65.3 54 -99 SPO 1997 04 22 12 13 82 4.4 -9 671.40 -65.9 -58.2 -65.5 55 -99 SPO 1997 04 22 12 14 81 4.4 -9 671.30 -66.0 -58.4 -65.7 54 -99 SPO 1997 04 22 12 15 81 4.5 -9 671.30 -66.0 -58.4 -65.6 54 -99 SPO 1997 04 22 12 16 82 4.4 -9 671.30 -65.8 -58.3 -65.6 52 -99 SPO 1997 04 22 12 17 82 4.5 -9 671.30 -65.6 -58.3 -65.5 50 -99 SPO 1997 04 22 12 18 80 4.4 -9 671.30 -65.6 -58.3 -65.4 51 -99 SPO 1997 04 22 12 19 79 4.4 -9 671.30 -65.5 -58.2 -65.4 50 -99 SPO 1997 04 22 12 20 79 4.6 -9 671.30 -65.4 -58.2 -65.3 51 -99 SPO 1997 04 22 12 21 80 4.7 -9 671.30 -65.3 -58.2 -65.2 51 -99 SPO 1997 04 22 12 22 80 4.6 -9 671.30 -65.2 -58.1 -65.2 51 -99 SPO 1997 04 22 12 23 81 4.6 -9 671.30 -65.3 -58.1 -65.2 52 -99 SPO 1997 04 22 12 24 81 4.6 -9 671.20 -65.3 -58.2 -65.3 52 -99 SPO 1997 04 22 12 25 80 4.8 -9 671.20 -65.4 -58.2 -65.3 52 -99 SPO 1997 04 22 12 26 81 5.0 -9 671.20 -65.3 -58.2 -65.3 52 -99 SPO 1997 04 22 12 27 81 5.0 -9 671.20 -65.3 -58.1 -65.3 52 -99 SPO 1997 04 22 12 28 79 5.0 -9 671.20 -65.2 -58.0 -65.2 51 -99 SPO 1997 04 22 12 29 79 5.0 -9 671.20 -64.9 -57.9 -65.1 50 -99 SPO 1997 04 22 12 30 80 4.9 -9 671.20 -64.8 -57.8 -65.0 50 -99 SPO 1997 04 22 12 31 80 5.0 -9 671.20 -64.6 -58.0 -64.9 50 -99 SPO 1997 04 22 12 32 81 5.1 -9 671.20 -64.4 -58.0 -64.8 50 -99 SPO 1997 04 22 12 33 81 4.9 -9 671.20 -64.2 -57.9 -64.6 50 -99 SPO 1997 04 22 12 34 81 4.9 -9 671.10 -64.1 -58.0 -64.5 51 -99 SPO 1997 04 22 12 35 81 4.9 -9 671.20 -64.0 -58.1 -64.4 51 -99 SPO 1997 04 22 12 36 81 4.8 -9 671.20 -63.9 -58.1 -64.4 51 -99 SPO 1997 04 22 12 37 80 5.0 -9 671.20 -63.9 -58.1 -64.3 51 -99 SPO 1997 04 22 12 38 78 5.1 -9 671.10 -64.0 -58.1 -64.3 53 -99 SPO 1997 04 22 12 39 77 5.1 -9 671.10 -63.8 -58.0 -64.2 51 -99 SPO 1997 04 22 12 40 77 5.1 -9 671.10 -63.8 -58.0 -64.1 51 -99 SPO 1997 04 22 12 41 76 5.1 -9 671.10 -63.7 -58.1 -64.0 52 -99 SPO 1997 04 22 12 42 76 5.1 -9 671.10 -63.6 -58.1 -64.0 53 -99 SPO 1997 04 22 12 43 77 5.1 -9 671.10 -63.6 -57.9 -64.0 54 -99 SPO 1997 04 22 12 44 77 5.1 -9 671.10 -63.7 -58.0 -64.0 55 -99 SPO 1997 04 22 12 45 77 5.1 -9 671.10 -63.6 -57.9 -63.9 54 -99 SPO 1997 04 22 12 46 77 5.2 -9 671.10 -63.6 -57.9 -63.9 55 -99 SPO 1997 04 22 12 47 76 5.2 -9 671.10 -63.6 -57.9 -63.9 55 -99 SPO 1997 04 22 12 48 76 5.3 -9 671.10 -63.6 -57.9 -63.8 55 -99 SPO 1997 04 22 12 49 76 5.2 -9 671.10 -63.5 -57.9 -63.8 54 -99 SPO 1997 04 22 12 50 76 5.2 -9 671.10 -63.5 -57.8 -63.7 54 -99 SPO 1997 04 22 12 51 77 5.3 -9 671.10 -63.5 -57.9 -63.7 54 -99 SPO 1997 04 22 12 52 77 5.3 -9 671.10 -63.4 -58.0 -63.7 54 -99 SPO 1997 04 22 12 53 76 5.4 -9 671.10 -63.4 -58.1 -63.6 54 -99 SPO 1997 04 22 12 54 75 5.4 -9 671.10 -63.4 -58.2 -63.6 54 -99 SPO 1997 04 22 12 55 75 5.3 -9 671.10 -63.4 -58.2 -63.6 54 -99 SPO 1997 04 22 12 56 76 5.2 -9 671.10 -63.4 -58.3 -63.6 56 -99 SPO 1997 04 22 12 57 76 5.1 -9 671.10 -63.4 -58.3 -63.6 56 -99 SPO 1997 04 22 12 58 76 5.1 -9 671.10 -63.4 -58.4 -63.6 57 -99 SPO 1997 04 22 12 59 76 5.1 -9 671.10 -63.4 -58.4 -63.6 57 -99 SPO 1997 04 22 13 00 78 5.1 -9 671.10 -63.4 -58.5 -63.6 57 0 SPO 1997 04 22 13 01 78 5.0 -9 671.10 -63.4 -58.4 -63.6 57 -99 SPO 1997 04 22 13 02 77 4.9 -9 671.10 -63.5 -58.4 -63.6 58 -99 SPO 1997 04 22 13 03 78 4.9 -9 671.10 -63.5 -58.5 -63.6 58 -99 SPO 1997 04 22 13 04 77 5.0 -9 671.10 -63.6 -58.6 -63.7 59 -99 SPO 1997 04 22 13 05 77 5.1 -9 671.10 -63.6 -58.7 -63.7 59 -99 SPO 1997 04 22 13 06 77 5.0 -9 671.10 -63.6 -58.6 -63.7 60 -99 SPO 1997 04 22 13 07 78 5.0 -9 671.10 -63.5 -58.6 -63.7 59 -99 SPO 1997 04 22 13 08 78 5.0 -9 671.10 -63.5 -58.6 -63.7 58 -99 SPO 1997 04 22 13 09 77 4.8 -9 671.10 -63.5 -58.6 -63.6 57 -99 SPO 1997 04 22 13 10 77 4.9 -9 671.10 -63.6 -58.6 -63.6 59 -99 SPO 1997 04 22 13 11 77 4.8 -9 671.10 -63.6 -58.6 -63.7 59 -99 SPO 1997 04 22 13 12 78 4.8 -9 671.00 -63.6 -58.6 -63.7 59 -99 SPO 1997 04 22 13 13 79 4.8 -9 671.00 -63.6 -58.6 -63.7 58 -99 SPO 1997 04 22 13 14 80 4.8 -9 671.00 -63.7 -58.6 -63.7 59 -99 SPO 1997 04 22 13 15 83 4.8 -9 671.00 -63.7 -58.6 -63.7 58 -99 SPO 1997 04 22 13 16 84 4.7 -9 671.00 -63.8 -58.7 -63.8 59 -99 SPO 1997 04 22 13 17 85 4.6 -9 671.00 -63.8 -58.7 -63.8 59 -99 SPO 1997 04 22 13 18 84 4.7 -9 671.00 -63.9 -58.7 -63.8 59 -99 SPO 1997 04 22 13 19 82 4.9 -9 671.00 -63.8 -58.7 -63.8 58 -99 SPO 1997 04 22 13 20 82 5.0 -9 671.00 -63.8 -58.7 -63.8 59 -99 SPO 1997 04 22 13 21 83 4.8 -9 671.00 -63.8 -58.7 -63.8 58 -99 SPO 1997 04 22 13 22 84 4.7 -9 670.90 -63.9 -58.8 -63.8 59 -99 SPO 1997 04 22 13 23 84 4.6 -9 670.90 -63.9 -58.9 -63.9 57 -99 SPO 1997 04 22 13 24 82 4.5 -9 670.90 -63.9 -58.8 -63.9 56 -99 SPO 1997 04 22 13 25 82 4.4 -9 670.90 -63.9 -58.8 -63.9 56 -99 SPO 1997 04 22 13 26 83 4.4 -9 670.90 -63.9 -58.9 -63.9 56 -99 SPO 1997 04 22 13 27 82 4.5 -9 670.90 -63.9 -58.9 -63.9 56 -99 SPO 1997 04 22 13 28 82 4.5 -9 670.90 -64.0 -58.8 -63.9 57 -99 SPO 1997 04 22 13 29 83 4.4 -9 670.90 -64.0 -58.9 -64.0 57 -99 SPO 1997 04 22 13 30 85 4.2 -9 670.90 -64.1 -59.0 -64.0 58 -99 SPO 1997 04 22 13 31 86 4.3 -9 670.90 -64.1 -59.0 -64.1 58 -99 SPO 1997 04 22 13 32 84 4.4 -9 670.90 -64.1 -59.0 -64.1 57 -99 SPO 1997 04 22 13 33 84 4.5 -9 670.90 -64.2 -58.9 -64.1 59 -99 SPO 1997 04 22 13 34 85 4.5 -9 670.90 -64.2 -58.8 -64.1 58 -99 SPO 1997 04 22 13 35 85 4.4 -9 670.90 -64.3 -58.8 -64.2 58 -99 SPO 1997 04 22 13 36 84 4.4 -9 670.80 -64.4 -58.8 -64.2 58 -99 SPO 1997 04 22 13 37 85 4.3 -9 670.80 -64.4 -58.8 -64.3 56 -99 SPO 1997 04 22 13 38 86 4.3 -9 670.80 -64.4 -58.9 -64.3 56 -99 SPO 1997 04 22 13 39 86 4.4 -9 670.80 -64.4 -59.0 -64.3 56 -99 SPO 1997 04 22 13 40 87 4.5 -9 670.80 -64.4 -59.0 -64.3 56 -99 SPO 1997 04 22 13 41 86 4.4 -9 670.80 -64.6 -59.1 -64.4 58 -99 SPO 1997 04 22 13 42 86 4.2 -9 670.80 -64.8 -59.1 -64.6 58 -99 SPO 1997 04 22 13 43 87 4.1 -9 670.80 -64.9 -59.1 -64.6 58 -99 SPO 1997 04 22 13 44 87 4.1 -9 670.80 -65.0 -59.2 -64.7 58 -99 SPO 1997 04 22 13 45 86 4.1 -9 670.80 -65.1 -59.2 -64.8 58 -99 SPO 1997 04 22 13 46 85 4.1 -9 670.80 -65.2 -59.2 -64.9 58 -99 SPO 1997 04 22 13 47 86 4.1 -9 670.80 -65.2 -59.2 -64.9 58 -99 SPO 1997 04 22 13 48 86 4.1 -9 670.80 -65.3 -59.2 -64.9 58 -99 SPO 1997 04 22 13 49 88 4.2 -9 670.80 -65.6 -59.2 -65.1 58 -99 SPO 1997 04 22 13 50 88 4.3 -9 670.80 -65.7 -59.2 -65.1 57 -99 SPO 1997 04 22 13 51 89 4.3 -9 670.80 -65.7 -59.2 -65.2 56 -99 SPO 1997 04 22 13 52 87 4.2 -9 670.80 -65.8 -59.1 -65.2 56 -99 SPO 1997 04 22 13 53 86 4.3 -9 670.80 -65.8 -59.0 -65.3 56 -99 SPO 1997 04 22 13 54 84 4.3 -9 670.70 -65.9 -59.0 -65.3 57 -99 SPO 1997 04 22 13 55 83 4.4 -9 670.70 -65.9 -59.0 -65.4 56 -99 SPO 1997 04 22 13 56 81 4.5 -9 670.70 -65.9 -59.0 -65.4 56 -99 SPO 1997 04 22 13 57 80 4.5 -9 670.70 -65.9 -59.0 -65.4 56 -99 SPO 1997 04 22 13 58 80 4.6 -9 670.70 -65.8 -59.0 -65.4 54 -99 SPO 1997 04 22 13 59 80 4.5 -9 670.70 -65.8 -59.0 -65.4 54 -99 SPO 1997 04 22 14 00 81 4.6 -9 670.70 -65.6 -59.0 -65.4 53 0 SPO 1997 04 22 14 01 82 4.5 -9 670.70 -65.5 -59.0 -65.4 52 -99 SPO 1997 04 22 14 02 83 4.4 -9 670.70 -65.4 -59.1 -65.3 52 -99 SPO 1997 04 22 14 03 83 4.4 -9 670.70 -65.4 -59.2 -65.3 53 -99 SPO 1997 04 22 14 04 83 4.4 -9 670.70 -65.5 -59.2 -65.3 55 -99 SPO 1997 04 22 14 05 81 4.5 -9 670.70 -65.5 -59.2 -65.3 55 -99 SPO 1997 04 22 14 06 81 4.5 -9 670.70 -65.5 -59.2 -65.3 55 -99 SPO 1997 04 22 14 07 82 4.4 -9 670.70 -65.5 -59.2 -65.4 55 -99 SPO 1997 04 22 14 08 83 4.4 -9 670.60 -65.6 -59.3 -65.4 55 -99 SPO 1997 04 22 14 09 83 4.3 -9 670.60 -65.7 -59.3 -65.5 54 -99 SPO 1997 04 22 14 10 82 4.4 -9 670.60 -65.7 -59.3 -65.5 54 -99 SPO 1997 04 22 14 11 82 4.5 -9 670.60 -65.7 -59.3 -65.5 54 -99 SPO 1997 04 22 14 12 83 4.5 -9 670.60 -65.7 -59.2 -65.4 54 -99 SPO 1997 04 22 14 13 82 4.6 -9 670.60 -65.7 -59.1 -65.4 53 -99 SPO 1997 04 22 14 14 83 4.6 -9 670.60 -65.7 -59.1 -65.4 54 -99 SPO 1997 04 22 14 15 83 4.5 -9 670.60 -65.8 -59.1 -65.5 54 -99 SPO 1997 04 22 14 16 82 4.5 -9 670.60 -65.7 -59.1 -65.5 54 -99 SPO 1997 04 22 14 17 81 4.5 -9 670.60 -65.8 -59.0 -65.6 54 -99 SPO 1997 04 22 14 18 81 4.5 -9 670.60 -65.7 -59.0 -65.5 54 -99 SPO 1997 04 22 14 19 82 4.4 -9 670.60 -65.7 -59.0 -65.5 54 -99 SPO 1997 04 22 14 20 83 4.5 -9 670.60 -65.8 -59.0 -65.6 54 -99 SPO 1997 04 22 14 21 82 4.4 -9 670.60 -65.8 -59.0 -65.6 53 -99 SPO 1997 04 22 14 22 80 4.4 -9 670.60 -65.8 -58.9 -65.6 52 -99 SPO 1997 04 22 14 23 80 4.5 -9 670.60 -65.7 -58.8 -65.5 52 -99 SPO 1997 04 22 14 24 80 4.6 -9 670.60 -65.7 -58.8 -65.4 53 -99 SPO 1997 04 22 14 25 80 4.5 -9 670.60 -65.7 -58.8 -65.5 53 -99 SPO 1997 04 22 14 26 81 4.5 -9 670.60 -65.6 -58.8 -65.5 53 -99 SPO 1997 04 22 14 27 81 4.5 -9 670.60 -65.6 -58.9 -65.4 54 -99 SPO 1997 04 22 14 28 81 4.5 -9 670.60 -65.4 -58.9 -65.4 53 -99 SPO 1997 04 22 14 29 80 4.5 -9 670.60 -65.2 -58.9 -65.3 52 -99 SPO 1997 04 22 14 30 82 4.5 -9 670.60 -65.2 -58.8 -65.2 53 -99 SPO 1997 04 22 14 31 81 4.6 -9 670.60 -65.2 -58.7 -65.2 54 -99 SPO 1997 04 22 14 32 81 4.7 -9 670.60 -65.2 -58.8 -65.2 54 -99 SPO 1997 04 22 14 33 81 4.7 -9 670.50 -65.0 -58.9 -65.1 52 -99 SPO 1997 04 22 14 34 81 4.7 -9 670.50 -64.9 -59.0 -65.0 51 -99 SPO 1997 04 22 14 35 81 4.6 -9 670.60 -64.9 -59.0 -65.0 52 -99 SPO 1997 04 22 14 36 81 4.5 -9 670.50 -65.0 -59.1 -65.1 53 -99 SPO 1997 04 22 14 37 81 4.6 -9 670.50 -65.1 -59.0 -65.1 53 -99 SPO 1997 04 22 14 38 80 4.6 -9 670.50 -65.0 -59.0 -65.1 53 -99 SPO 1997 04 22 14 39 82 4.6 -9 670.60 -64.9 -59.0 -65.1 53 -99 SPO 1997 04 22 14 40 83 4.6 -9 670.60 -64.9 -59.0 -65.0 54 -99 SPO 1997 04 22 14 41 83 4.6 -9 670.50 -64.9 -59.0 -65.1 55 -99 SPO 1997 04 22 14 42 84 4.7 -9 670.50 -64.9 -59.0 -65.1 55 -99 SPO 1997 04 22 14 43 83 4.7 -9 670.50 -64.8 -59.0 -65.0 54 -99 SPO 1997 04 22 14 44 82 4.7 -9 670.50 -64.8 -58.9 -65.0 53 -99 SPO 1997 04 22 14 45 81 4.7 -9 670.50 -64.7 -58.7 -64.9 53 -99 SPO 1997 04 22 14 46 82 4.7 -9 670.40 -64.7 -58.6 -64.9 53 -99 SPO 1997 04 22 14 47 82 4.7 -9 670.40 -64.6 -58.6 -64.9 52 -99 SPO 1997 04 22 14 48 84 4.6 -9 670.40 -64.6 -58.8 -64.8 53 -99 SPO 1997 04 22 14 49 86 4.7 -9 670.50 -64.5 -59.0 -64.8 53 -99 SPO 1997 04 22 14 50 86 4.8 -9 670.40 -64.5 -59.0 -64.7 53 -99 SPO 1997 04 22 14 51 84 4.8 -9 670.40 -64.5 -59.0 -64.7 54 -99 SPO 1997 04 22 14 52 83 4.9 -9 670.40 -64.5 -59.0 -64.7 54 -99 SPO 1997 04 22 14 53 83 5.0 -9 670.40 -64.5 -59.0 -64.7 54 -99 SPO 1997 04 22 14 54 83 4.8 -9 670.40 -64.5 -59.0 -64.7 54 -99 SPO 1997 04 22 14 55 83 4.7 -9 670.40 -64.5 -59.0 -64.7 55 -99 SPO 1997 04 22 14 56 83 4.7 -9 670.40 -64.5 -59.1 -64.7 55 -99 SPO 1997 04 22 14 57 85 4.5 -9 670.40 -64.5 -59.2 -64.7 55 -99 SPO 1997 04 22 14 58 85 4.4 -9 670.50 -64.6 -59.3 -64.7 55 -99 SPO 1997 04 22 14 59 84 4.4 -9 670.40 -64.6 -59.2 -64.7 55 -99 SPO 1997 04 22 15 00 85 4.3 -9 670.40 -64.5 -59.1 -64.7 56 0 SPO 1997 04 22 15 01 87 4.2 -9 670.40 -64.6 -59.2 -64.7 57 -99 SPO 1997 04 22 15 02 88 4.1 -9 670.40 -64.6 -59.4 -64.7 56 -99 SPO 1997 04 22 15 03 88 4.0 -9 670.40 -64.7 -59.5 -64.8 57 -99 SPO 1997 04 22 15 04 87 4.1 -9 670.40 -64.8 -59.7 -64.8 57 -99 SPO 1997 04 22 15 05 86 4.2 -9 670.40 -64.8 -59.7 -64.8 56 -99 SPO 1997 04 22 15 06 84 4.2 -9 670.40 -64.9 -59.6 -64.8 56 -99 SPO 1997 04 22 15 07 83 4.2 -9 670.40 -65.0 -59.5 -64.8 56 -99 SPO 1997 04 22 15 08 82 4.4 -9 670.40 -65.0 -59.6 -64.9 55 -99 SPO 1997 04 22 15 09 83 4.4 -9 670.40 -65.1 -59.4 -64.9 55 -99 SPO 1997 04 22 15 10 82 4.5 -9 670.40 -65.1 -59.1 -65.0 55 -99 SPO 1997 04 22 15 11 81 4.5 -9 670.40 -65.2 -59.1 -65.0 55 -99 SPO 1997 04 22 15 12 81 4.5 -9 670.30 -65.1 -59.4 -65.0 55 -99 SPO 1997 04 22 15 13 82 4.5 -9 670.30 -65.0 -59.5 -64.9 55 -99 SPO 1997 04 22 15 14 82 4.5 -9 670.30 -65.0 -59.5 -64.9 55 -99 SPO 1997 04 22 15 15 82 4.6 -9 670.30 -65.0 -59.4 -64.9 56 -99 SPO 1997 04 22 15 16 80 4.7 -9 670.30 -64.9 -59.1 -64.9 55 -99 SPO 1997 04 22 15 17 80 4.8 -9 670.30 -64.8 -58.9 -64.8 55 -99 SPO 1997 04 22 15 18 80 4.8 -9 670.20 -64.8 -59.0 -64.8 55 -99 SPO 1997 04 22 15 19 80 4.8 -9 670.20 -64.8 -59.0 -64.8 54 -99 SPO 1997 04 22 15 20 80 4.8 -9 670.20 -64.8 -59.1 -64.8 54 -99 SPO 1997 04 22 15 21 80 4.7 -9 670.20 -64.7 -59.1 -64.8 53 -99 SPO 1997 04 22 15 22 82 4.6 -9 670.30 -64.6 -59.2 -64.7 54 -99 SPO 1997 04 22 15 23 81 4.6 -9 670.20 -64.6 -59.1 -64.7 55 -99 SPO 1997 04 22 15 24 80 4.8 -9 670.20 -64.6 -59.1 -64.7 55 -99 SPO 1997 04 22 15 25 79 4.8 -9 670.20 -64.6 -59.0 -64.7 55 -99 SPO 1997 04 22 15 26 80 4.8 -9 670.20 -64.5 -58.9 -64.6 56 -99 SPO 1997 04 22 15 27 81 4.8 -9 670.20 -64.5 -59.0 -64.6 56 -99 SPO 1997 04 22 15 28 80 4.8 -9 670.20 -64.5 -58.8 -64.6 56 -99 SPO 1997 04 22 15 29 79 4.8 -9 670.10 -64.5 -58.8 -64.6 56 -99 SPO 1997 04 22 15 30 78 4.8 -9 670.10 -64.5 -58.7 -64.6 56 -99 SPO 1997 04 22 15 31 78 4.9 -9 670.10 -64.4 -58.7 -64.6 56 -99 SPO 1997 04 22 15 32 77 4.9 -9 670.10 -64.4 -58.8 -64.6 56 -99 SPO 1997 04 22 15 33 77 4.9 -9 670.10 -64.4 -58.8 -64.6 56 -99 SPO 1997 04 22 15 34 77 4.9 -9 670.10 -64.4 -58.8 -64.6 57 -99 SPO 1997 04 22 15 35 77 4.8 -9 670.10 -64.4 -58.8 -64.6 57 -99 SPO 1997 04 22 15 36 77 4.7 -9 670.10 -64.5 -58.9 -64.6 58 -99 SPO 1997 04 22 15 37 76 4.6 -9 670.10 -64.4 -59.0 -64.5 58 -99 SPO 1997 04 22 15 38 77 4.5 -9 670.10 -64.4 -59.0 -64.5 58 -99 SPO 1997 04 22 15 39 77 4.5 -9 670.10 -64.4 -59.0 -64.5 58 -99 SPO 1997 04 22 15 40 79 4.4 -9 670.10 -64.5 -59.0 -64.6 58 -99 SPO 1997 04 22 15 41 81 4.2 -9 670.10 -64.5 -59.1 -64.6 57 -99 SPO 1997 04 22 15 42 84 4.1 -9 670.20 -64.6 -59.2 -64.7 57 -99 SPO 1997 04 22 15 43 85 4.0 -9 670.20 -64.7 -59.2 -64.7 57 -99 SPO 1997 04 22 15 44 85 4.0 -9 670.10 -64.8 -59.3 -64.8 57 -99 SPO 1997 04 22 15 45 85 4.0 -9 670.10 -64.8 -59.3 -64.8 57 -99 SPO 1997 04 22 15 46 85 4.2 -9 670.10 -64.8 -59.3 -64.8 57 -99 SPO 1997 04 22 15 47 85 4.2 -9 670.10 -64.9 -59.3 -64.8 58 -99 SPO 1997 04 22 15 48 85 4.2 -9 670.10 -65.0 -59.4 -64.9 58 -99 SPO 1997 04 22 15 49 84 4.2 -9 670.10 -65.0 -59.5 -64.9 57 -99 SPO 1997 04 22 15 50 83 4.1 -9 670.10 -65.1 -59.6 -64.9 58 -99 SPO 1997 04 22 15 51 83 4.0 -9 670.10 -65.2 -59.8 -65.0 59 -99 SPO 1997 04 22 15 52 81 4.0 -9 670.20 -65.2 -59.8 -65.0 58 -99 SPO 1997 04 22 15 53 81 4.0 -9 670.20 -65.2 -59.6 -65.0 58 -99 SPO 1997 04 22 15 54 81 3.9 -9 670.20 -65.2 -59.6 -65.1 58 -99 SPO 1997 04 22 15 55 83 3.9 -9 670.10 -65.3 -59.8 -65.1 58 -99 SPO 1997 04 22 15 56 84 4.0 -9 670.10 -65.2 -60.0 -65.1 57 -99 SPO 1997 04 22 15 57 84 4.1 -9 670.10 -65.3 -59.8 -65.1 57 -99 SPO 1997 04 22 15 58 84 4.2 -9 670.10 -65.3 -59.7 -65.1 57 -99 SPO 1997 04 22 15 59 84 4.2 -9 670.10 -65.4 -59.7 -65.1 58 -99 SPO 1997 04 22 16 00 85 4.2 -9 670.10 -65.4 -59.7 -65.1 58 0 SPO 1997 04 22 16 01 86 4.1 -9 670.10 -65.3 -59.8 -65.1 58 -99 SPO 1997 04 22 16 02 86 4.0 -9 670.10 -65.2 -59.8 -65.0 57 -99 SPO 1997 04 22 16 03 86 4.0 -9 670.10 -65.2 -59.9 -65.0 56 -99 SPO 1997 04 22 16 04 86 4.0 -9 670.10 -65.2 -60.0 -65.1 56 -99 SPO 1997 04 22 16 05 86 3.9 -9 670.10 -65.3 -60.0 -65.1 56 -99 SPO 1997 04 22 16 06 86 4.0 -9 670.10 -65.3 -59.9 -65.1 56 -99 SPO 1997 04 22 16 07 84 4.0 -9 670.10 -65.2 -59.8 -65.1 55 -99 SPO 1997 04 22 16 08 83 4.0 -9 670.10 -65.2 -59.9 -65.1 55 -99 SPO 1997 04 22 16 09 83 4.0 -9 670.10 -65.2 -59.8 -65.1 55 -99 SPO 1997 04 22 16 10 84 4.1 -9 670.10 -65.1 -59.7 -65.0 55 -99 SPO 1997 04 22 16 11 84 4.0 -9 670.10 -65.2 -59.8 -65.1 57 -99 SPO 1997 04 22 16 12 85 4.0 -9 670.10 -65.3 -59.7 -65.1 57 -99 SPO 1997 04 22 16 13 85 4.0 -9 670.00 -65.4 -59.5 -65.2 57 -99 SPO 1997 04 22 16 14 85 4.1 -9 670.00 -65.4 -59.2 -65.2 57 -99 SPO 1997 04 22 16 15 84 4.2 -9 670.00 -65.4 -59.4 -65.2 55 -99 SPO 1997 04 22 16 16 84 4.2 -9 670.00 -65.6 -59.6 -65.3 57 -99 SPO 1997 04 22 16 17 82 4.3 -9 670.00 -65.7 -59.6 -65.4 56 -99 SPO 1997 04 22 16 18 81 4.3 -9 670.00 -65.7 -59.6 -65.4 55 -99 SPO 1997 04 22 16 19 80 4.3 -9 670.00 -65.7 -59.4 -65.4 54 -99 SPO 1997 04 22 16 20 81 4.2 -9 670.00 -65.8 -59.4 -65.4 56 -99 SPO 1997 04 22 16 21 82 4.2 -9 670.00 -65.7 -59.5 -65.5 54 -99 SPO 1997 04 22 16 22 82 4.2 -9 670.00 -65.8 -59.6 -65.5 57 -99 SPO 1997 04 22 16 23 83 4.2 -9 670.00 -65.8 -59.8 -65.5 57 -99 SPO 1997 04 22 16 24 83 4.0 -9 670.00 -65.8 -59.8 -65.6 57 -99 SPO 1997 04 22 16 25 83 4.0 -9 669.90 -65.7 -59.6 -65.6 56 -99 SPO 1997 04 22 16 26 83 4.1 -9 669.90 -65.7 -59.6 -65.6 56 -99 SPO 1997 04 22 16 27 84 4.1 -9 669.90 -65.7 -59.7 -65.6 56 -99 SPO 1997 04 22 16 28 84 4.0 -9 669.90 -65.7 -59.8 -65.6 56 -99 SPO 1997 04 22 16 29 84 4.0 -9 669.90 -65.6 -59.8 -65.6 55 -99 SPO 1997 04 22 16 30 84 4.0 -9 669.90 -65.7 -59.8 -65.6 54 -99 SPO 1997 04 22 16 31 85 4.1 -9 670.00 -65.7 -59.9 -65.6 55 -99 SPO 1997 04 22 16 32 86 4.0 -9 670.00 -65.9 -60.0 -65.7 56 -99 SPO 1997 04 22 16 33 87 3.9 -9 670.00 -66.0 -60.1 -65.8 57 -99 SPO 1997 04 22 16 34 87 3.9 -9 670.00 -65.9 -60.2 -65.8 56 -99 SPO 1997 04 22 16 35 88 3.9 -9 670.00 -65.9 -60.3 -65.6 55 -99 SPO 1997 04 22 16 36 89 3.9 -9 670.00 -65.9 -60.2 -65.6 55 -99 SPO 1997 04 22 16 37 89 3.9 -9 669.90 -66.1 -60.3 -65.7 57 -99 SPO 1997 04 22 16 38 88 4.0 -9 669.90 -66.3 -60.3 -65.8 57 -99 SPO 1997 04 22 16 39 90 3.8 -9 669.90 -66.6 -60.4 -66.1 58 -99 SPO 1997 04 22 16 40 92 3.7 -9 669.90 -67.0 -60.6 -66.4 59 -99 SPO 1997 04 22 16 41 95 3.5 -9 669.90 -66.8 -60.7 -66.4 56 -99 SPO 1997 04 22 16 42 97 3.3 -9 670.00 -66.1 -60.8 -66.2 52 -99 SPO 1997 04 22 16 43 99 3.2 -9 670.00 -65.4 -61.0 -65.8 50 -99 SPO 1997 04 22 16 44 100 3.1 -9 669.90 -65.2 -61.1 -65.6 51 -99 SPO 1997 04 22 16 45 100 3.1 -9 669.90 -65.2 -61.1 -65.5 52 -99 SPO 1997 04 22 16 46 100 3.3 -9 669.90 -64.8 -61.1 -65.3 51 -99 SPO 1997 04 22 16 47 101 3.3 -9 669.90 -64.4 -61.1 -65.0 50 -99 SPO 1997 04 22 16 48 104 3.2 -9 669.90 -64.2 -61.2 -64.8 50 -99 SPO 1997 04 22 16 49 105 3.1 -9 669.90 -64.2 -61.2 -64.7 51 -99 SPO 1997 04 22 16 50 106 3.1 -9 669.90 -63.9 -61.3 -64.6 50 -99 SPO 1997 04 22 16 51 111 2.9 -9 669.90 -63.8 -61.4 -64.4 50 -99 SPO 1997 04 22 16 52 117 3.0 -9 669.90 -64.2 -61.4 -64.6 53 -99 SPO 1997 04 22 16 53 116 3.0 -9 669.90 -64.6 -61.4 -64.8 55 -99 SPO 1997 04 22 16 54 112 3.1 -9 669.90 -64.4 -61.3 -64.8 54 -99 SPO 1997 04 22 16 55 107 3.3 -9 669.90 -64.7 -61.2 -64.8 56 -99 SPO 1997 04 22 16 56 106 3.3 -9 669.90 -65.2 -61.1 -65.0 59 -99 SPO 1997 04 22 16 57 107 3.4 -9 669.90 -65.3 -61.0 -65.1 58 -99 SPO 1997 04 22 16 58 107 3.5 -9 669.90 -65.4 -61.1 -65.2 58 -99 SPO 1997 04 22 16 59 108 3.3 -9 669.90 -65.6 -61.1 -65.3 59 -99 SPO 1997 04 22 17 00 111 3.2 -9 669.90 -65.5 -61.1 -65.3 58 0 SPO 1997 04 22 17 01 113 3.1 -9 669.90 -65.2 -61.2 -65.2 55 -99 SPO 1997 04 22 17 02 113 3.2 -9 670.00 -64.6 -61.2 -64.9 51 -99 SPO 1997 04 22 17 03 112 3.2 -9 670.00 -64.4 -61.3 -64.6 52 -99 SPO 1997 04 22 17 04 110 3.2 -9 670.00 -64.6 -61.2 -64.6 54 -99 SPO 1997 04 22 17 05 107 3.4 -9 669.90 -65.0 -61.2 -64.8 56 -99 SPO 1997 04 22 17 06 107 3.4 -9 669.90 -65.4 -61.1 -65.0 58 -99 SPO 1997 04 22 17 07 108 3.4 -9 669.90 -65.6 -61.1 -65.2 59 -99 SPO 1997 04 22 17 08 108 3.4 -9 669.90 -65.6 -61.1 -65.3 58 -99 SPO 1997 04 22 17 09 108 3.4 -9 669.90 -65.7 -61.2 -65.4 58 -99 SPO 1997 04 22 17 10 108 3.4 -9 669.90 -65.7 -61.1 -65.5 57 -99 SPO 1997 04 22 17 11 109 3.4 -9 670.00 -65.7 -61.0 -65.5 57 -99 SPO 1997 04 22 17 12 109 3.4 -9 670.00 -65.8 -61.1 -65.5 57 -99 SPO 1997 04 22 17 13 111 3.3 -9 670.00 -65.7 -61.1 -65.5 56 -99 SPO 1997 04 22 17 14 111 3.3 -9 670.00 -65.7 -61.1 -65.6 56 -99 SPO 1997 04 22 17 15 111 3.2 -9 670.00 -65.7 -61.1 -65.6 55 -99 SPO 1997 04 22 17 16 112 3.2 -9 670.00 -65.4 -61.2 -65.4 54 -99 SPO 1997 04 22 17 17 113 3.3 -9 670.00 -65.0 -61.4 -65.2 53 -99 SPO 1997 04 22 17 18 111 3.4 -9 670.00 -65.3 -61.4 -65.2 56 -99 SPO 1997 04 22 17 19 111 3.4 -9 669.90 -65.8 -61.3 -65.5 61 -99 SPO 1997 04 22 17 20 112 3.5 -9 669.90 -65.9 -61.4 -65.7 60 -99 SPO 1997 04 22 17 21 112 3.6 -9 669.90 -65.9 -61.4 -65.7 59 -99 SPO 1997 04 22 17 22 110 3.7 -9 669.90 -66.0 -61.4 -65.8 60 -99 SPO 1997 04 22 17 23 108 3.8 -9 669.90 -66.3 -61.3 -66.0 61 -99 SPO 1997 04 22 17 24 107 3.9 -9 669.90 -66.4 -61.3 -66.1 59 -99 SPO 1997 04 22 17 25 108 3.9 -9 669.90 -66.6 -61.4 -66.2 58 -99 SPO 1997 04 22 17 26 108 3.8 -9 669.90 -66.6 -61.4 -66.3 57 -99 SPO 1997 04 22 17 27 107 3.9 -9 669.90 -66.6 -61.3 -66.3 56 -99 SPO 1997 04 22 17 28 106 3.9 -9 669.90 -66.8 -61.3 -66.4 56 -99 SPO 1997 04 22 17 29 103 3.9 -9 669.90 -66.8 -61.1 -66.4 56 -99 SPO 1997 04 22 17 30 102 3.8 -9 669.80 -66.8 -61.0 -66.4 56 -99 SPO 1997 04 22 17 31 102 3.8 -9 669.80 -66.7 -61.0 -66.4 55 -99 SPO 1997 04 22 17 32 103 3.7 -9 669.90 -66.6 -61.0 -66.4 55 -99 SPO 1997 04 22 17 33 103 3.7 -9 669.90 -66.6 -61.0 -66.4 55 -99 SPO 1997 04 22 17 34 103 3.7 -9 669.90 -66.6 -61.0 -66.4 55 -99 SPO 1997 04 22 17 35 101 3.8 -9 669.90 -66.5 -61.0 -66.4 54 -99 SPO 1997 04 22 17 36 97 4.0 -9 669.80 -66.6 -60.9 -66.4 55 -99 SPO 1997 04 22 17 37 97 4.0 -9 669.80 -66.4 -60.8 -66.3 54 -99 SPO 1997 04 22 17 38 97 4.0 -9 669.80 -66.4 -60.7 -66.3 54 -99 SPO 1997 04 22 17 39 97 4.0 -9 669.80 -66.3 -60.7 -66.3 53 -99 SPO 1997 04 22 17 40 97 4.0 -9 669.80 -66.3 -60.7 -66.2 53 -99 SPO 1997 04 22 17 41 96 4.0 -9 669.80 -66.2 -60.8 -66.2 52 -99 SPO 1997 04 22 17 42 94 3.9 -9 669.80 -66.2 -60.8 -66.2 53 -99 SPO 1997 04 22 17 43 93 3.9 -9 669.80 -66.2 -60.8 -66.2 54 -99 SPO 1997 04 22 17 44 93 3.8 -9 669.80 -66.2 -60.9 -66.2 54 -99 SPO 1997 04 22 17 45 94 3.8 -9 669.80 -66.2 -61.0 -66.2 54 -99 SPO 1997 04 22 17 46 96 3.9 -9 669.80 -66.1 -61.1 -66.2 54 -99 SPO 1997 04 22 17 47 97 4.0 -9 669.80 -66.1 -61.2 -66.2 54 -99 SPO 1997 04 22 17 48 97 4.0 -9 669.80 -66.2 -61.2 -66.2 54 -99 SPO 1997 04 22 17 49 96 4.0 -9 669.80 -66.3 -61.2 -66.2 54 -99 SPO 1997 04 22 17 50 96 3.9 -9 669.70 -66.4 -61.1 -66.3 55 -99 SPO 1997 04 22 17 51 97 3.8 -9 669.80 -66.6 -61.1 -66.4 56 -99 SPO 1997 04 22 17 52 97 3.6 -9 669.80 -66.5 -61.1 -66.4 55 -99 SPO 1997 04 22 17 53 99 3.4 -9 669.80 -66.5 -61.1 -66.4 55 -99 SPO 1997 04 22 17 54 102 3.3 -9 669.80 -66.2 -61.2 -66.2 53 -99 SPO 1997 04 22 17 55 102 3.2 -9 669.90 -65.9 -61.2 -66.1 52 -99 SPO 1997 04 22 17 56 104 3.2 -9 669.90 -65.4 -61.2 -65.8 51 -99 SPO 1997 04 22 17 57 105 3.3 -9 669.80 -64.8 -61.3 -65.4 49 -99 SPO 1997 04 22 17 58 105 3.4 -9 669.80 -64.7 -61.3 -65.3 50 -99 SPO 1997 04 22 17 59 105 3.4 -9 669.80 -64.9 -61.3 -65.3 52 -99 SPO 1997 04 22 18 00 105 3.4 -9 669.80 -65.3 -61.4 -65.5 55 0 SPO 1997 04 22 18 01 103 3.5 -9 669.70 -65.7 -61.4 -65.7 57 -99 SPO 1997 04 22 18 02 102 3.5 -9 669.70 -66.0 -61.4 -65.9 57 -99 SPO 1997 04 22 18 03 102 3.6 -9 669.70 -66.1 -61.4 -65.9 57 -99 SPO 1997 04 22 18 04 104 3.4 -9 669.70 -66.2 -61.3 -66.0 57 -99 SPO 1997 04 22 18 05 105 3.4 -9 669.70 -66.1 -61.3 -65.9 55 -99 SPO 1997 04 22 18 06 105 3.4 -9 669.70 -66.0 -61.4 -65.8 54 -99 SPO 1997 04 22 18 07 105 3.2 -9 669.70 -66.0 -61.4 -65.8 55 -99 SPO 1997 04 22 18 08 107 3.1 -9 669.80 -65.9 -61.5 -65.7 55 -99 SPO 1997 04 22 18 09 110 3.1 -9 669.80 -65.7 -61.5 -65.6 54 -99 SPO 1997 04 22 18 10 112 3.1 -9 669.80 -65.4 -61.5 -65.5 52 -99 SPO 1997 04 22 18 11 111 3.0 -9 669.80 -65.3 -61.4 -65.3 52 -99 SPO 1997 04 22 18 12 111 3.1 -9 669.80 -65.4 -61.4 -65.3 53 -99 SPO 1997 04 22 18 13 111 3.2 -9 669.70 -65.5 -61.4 -65.4 53 -99 SPO 1997 04 22 18 14 111 3.3 -9 669.70 -65.6 -61.4 -65.5 54 -99 SPO 1997 04 22 18 15 110 3.5 -9 669.70 -65.9 -61.4 -65.7 56 -99 SPO 1997 04 22 18 16 109 3.6 -9 669.70 -66.2 -61.4 -65.9 58 -99 SPO 1997 04 22 18 17 107 3.7 -9 669.70 -66.4 -61.2 -66.0 58 -99 SPO 1997 04 22 18 18 106 3.7 -9 669.70 -66.6 -61.2 -66.2 60 -99 SPO 1997 04 22 18 19 106 3.7 -9 669.70 -66.6 -61.2 -66.3 58 -99 SPO 1997 04 22 18 20 104 3.8 -9 669.70 -66.6 -61.2 -66.3 57 -99 SPO 1997 04 22 18 21 102 3.9 -9 669.60 -66.6 -61.1 -66.3 57 -99 SPO 1997 04 22 18 22 102 3.9 -9 669.60 -66.5 -61.0 -66.3 55 -99 SPO 1997 04 22 18 23 101 3.9 -9 669.60 -66.5 -61.0 -66.3 54 -99 SPO 1997 04 22 18 24 101 4.0 -9 669.60 -66.5 -60.9 -66.3 54 -99 SPO 1997 04 22 18 25 100 4.1 -9 669.60 -66.5 -60.8 -66.3 54 -99 SPO 1997 04 22 18 26 100 4.0 -9 669.60 -66.4 -60.8 -66.3 53 -99 SPO 1997 04 22 18 27 99 4.2 -9 669.60 -66.3 -60.8 -66.2 53 -99 SPO 1997 04 22 18 28 97 4.3 -9 669.60 -66.3 -60.9 -66.3 54 -99 SPO 1997 04 22 18 29 96 4.4 -9 669.60 -66.3 -61.0 -66.3 54 -99 SPO 1997 04 22 18 30 96 4.3 -9 669.60 -66.3 -61.0 -66.3 54 -99 SPO 1997 04 22 18 31 96 4.3 -9 669.60 -66.3 -61.1 -66.3 55 -99 SPO 1997 04 22 18 32 96 4.2 -9 669.60 -66.3 -61.1 -66.3 55 -99 SPO 1997 04 22 18 33 96 4.1 -9 669.60 -66.3 -61.2 -66.2 55 -99 SPO 1997 04 22 18 34 96 4.1 -9 669.60 -66.3 -61.2 -66.3 55 -99 SPO 1997 04 22 18 35 95 4.2 -9 669.60 -66.3 -61.2 -66.3 55 -99 SPO 1997 04 22 18 36 93 4.2 -9 669.60 -66.3 -61.2 -66.3 55 -99 SPO 1997 04 22 18 37 94 4.1 -9 669.60 -66.3 -61.2 -66.3 55 -99 SPO 1997 04 22 18 38 94 4.0 -9 669.60 -66.3 -61.3 -66.4 55 -99 SPO 1997 04 22 18 39 95 4.0 -9 669.60 -66.4 -61.4 -66.4 55 -99 SPO 1997 04 22 18 40 96 4.0 -9 669.60 -66.4 -61.5 -66.4 55 -99 SPO 1997 04 22 18 41 96 4.0 -9 669.60 -66.5 -61.5 -66.5 56 -99 SPO 1997 04 22 18 42 94 4.0 -9 669.60 -66.6 -61.5 -66.5 57 -99 SPO 1997 04 22 18 43 93 3.9 -9 669.60 -66.6 -61.6 -66.6 57 -99 SPO 1997 04 22 18 44 92 3.9 -9 669.60 -66.7 -61.6 -66.6 57 -99 SPO 1997 04 22 18 45 90 3.9 -9 669.60 -66.7 -61.6 -66.6 57 -99 SPO 1997 04 22 18 46 90 4.0 -9 669.60 -66.7 -61.4 -66.6 56 -99 SPO 1997 04 22 18 47 88 4.0 -9 669.60 -66.7 -61.2 -66.6 56 -99 SPO 1997 04 22 18 48 88 4.0 -9 669.60 -66.6 -61.0 -66.6 55 -99 SPO 1997 04 22 18 49 89 4.1 -9 669.50 -66.5 -61.0 -66.5 54 -99 SPO 1997 04 22 18 50 90 4.2 -9 669.50 -66.4 -61.0 -66.4 55 -99 SPO 1997 04 22 18 51 90 4.3 -9 669.50 -66.4 -60.8 -66.4 55 -99 SPO 1997 04 22 18 52 90 4.4 -9 669.50 -66.4 -60.8 -66.4 55 -99 SPO 1997 04 22 18 53 91 4.2 -9 669.50 -66.4 -60.8 -66.4 56 -99 SPO 1997 04 22 18 54 91 4.1 -9 669.50 -66.3 -60.8 -66.4 55 -99 SPO 1997 04 22 18 55 93 4.0 -9 669.60 -66.3 -61.0 -66.4 54 -99 SPO 1997 04 22 18 56 95 3.9 -9 669.60 -66.3 -61.2 -66.4 54 -99 SPO 1997 04 22 18 57 95 3.8 -9 669.60 -66.4 -61.3 -66.5 55 -99 SPO 1997 04 22 18 58 97 3.7 -9 669.60 -66.4 -61.5 -66.5 55 -99 SPO 1997 04 22 18 59 98 3.7 -9 669.60 -66.4 -61.6 -66.5 55 -99 SPO 1997 04 22 19 00 98 3.8 -9 669.50 -66.5 -61.6 -66.5 56 0 SPO 1997 04 22 19 01 97 3.9 -9 669.50 -66.5 -61.4 -66.5 56 -99 SPO 1997 04 22 19 02 96 4.0 -9 669.50 -66.6 -61.2 -66.5 57 -99 SPO 1997 04 22 19 03 94 4.0 -9 669.40 -66.6 -61.0 -66.6 57 -99 SPO 1997 04 22 19 04 94 4.0 -9 669.40 -66.6 -61.0 -66.6 57 -99 SPO 1997 04 22 19 05 94 3.9 -9 669.40 -66.5 -61.0 -66.5 57 -99 SPO 1997 04 22 19 06 94 3.9 -9 669.50 -66.6 -61.1 -66.6 57 -99 SPO 1997 04 22 19 07 96 3.8 -9 669.50 -66.5 -61.2 -66.6 56 -99 SPO 1997 04 22 19 08 96 3.8 -9 669.50 -66.6 -61.1 -66.6 57 -99 SPO 1997 04 22 19 09 96 3.8 -9 669.50 -66.6 -61.1 -66.7 55 -99 SPO 1997 04 22 19 10 97 3.7 -9 669.50 -66.7 -61.2 -66.7 56 -99 SPO 1997 04 22 19 11 98 3.6 -9 669.50 -66.8 -61.3 -66.8 56 -99 SPO 1997 04 22 19 12 100 3.6 -9 669.50 -67.0 -61.4 -66.8 56 -99 SPO 1997 04 22 19 13 99 3.7 -9 669.40 -67.1 -61.5 -67.0 56 -99 SPO 1997 04 22 19 14 98 3.7 -9 669.40 -67.2 -61.6 -67.0 57 -99 SPO 1997 04 22 19 15 98 3.7 -9 669.40 -67.3 -61.5 -67.1 57 -99 SPO 1997 04 22 19 16 98 3.7 -9 669.40 -67.3 -61.4 -67.0 57 -99 SPO 1997 04 22 19 17 97 3.7 -9 669.40 -67.3 -61.3 -67.0 56 -99 SPO 1997 04 22 19 18 95 3.8 -9 669.40 -67.4 -61.4 -67.1 56 -99 SPO 1997 04 22 19 19 94 3.8 -9 669.40 -67.4 -61.3 -67.2 55 -99 SPO 1997 04 22 19 20 95 3.8 -9 669.40 -67.5 -61.3 -67.2 56 -99 SPO 1997 04 22 19 21 95 3.9 -9 669.40 -67.6 -61.4 -67.3 55 -99 SPO 1997 04 22 19 22 96 3.8 -9 669.40 -67.6 -61.6 -67.4 55 -99 SPO 1997 04 22 19 23 96 3.8 -9 669.40 -67.6 -61.6 -67.4 55 -99 SPO 1997 04 22 19 24 97 3.8 -9 669.40 -67.6 -61.8 -67.4 54 -99 SPO 1997 04 22 19 25 97 3.7 -9 669.40 -67.7 -61.9 -67.4 56 -99 SPO 1997 04 22 19 26 97 3.8 -9 669.40 -67.6 -61.9 -67.4 56 -99 SPO 1997 04 22 19 27 96 3.9 -9 669.30 -67.6 -61.7 -67.4 56 -99 SPO 1997 04 22 19 28 95 4.0 -9 669.30 -67.5 -61.6 -67.4 55 -99 SPO 1997 04 22 19 29 95 4.0 -9 669.30 -67.6 -61.6 -67.4 55 -99 SPO 1997 04 22 19 30 94 4.1 -9 669.30 -67.6 -61.8 -67.4 55 -99 SPO 1997 04 22 19 31 94 4.0 -9 669.30 -67.7 -61.8 -67.5 56 -99 SPO 1997 04 22 19 32 93 4.0 -9 669.30 -67.6 -61.8 -67.5 55 -99 SPO 1997 04 22 19 33 93 4.0 -9 669.30 -67.5 -61.8 -67.5 53 -99 SPO 1997 04 22 19 34 93 4.1 -9 669.30 -67.4 -61.7 -67.4 52 -99 SPO 1997 04 22 19 35 93 4.3 -9 669.30 -67.4 -61.7 -67.4 53 -99 SPO 1997 04 22 19 36 92 4.4 -9 669.30 -67.5 -61.5 -67.4 54 -99 SPO 1997 04 22 19 37 91 4.4 -9 669.30 -67.5 -61.4 -67.5 55 -99 SPO 1997 04 22 19 38 90 4.3 -9 669.30 -67.4 -61.2 -67.4 54 -99 SPO 1997 04 22 19 39 91 4.3 -9 669.30 -67.4 -61.2 -67.4 54 -99 SPO 1997 04 22 19 40 92 4.2 -9 669.30 -67.4 -61.2 -67.4 55 -99 SPO 1997 04 22 19 41 94 4.1 -9 669.30 -67.4 -61.3 -67.4 55 -99 SPO 1997 04 22 19 42 94 4.1 -9 669.30 -67.3 -61.3 -67.4 54 -99 SPO 1997 04 22 19 43 94 4.1 -9 669.30 -67.3 -61.4 -67.4 54 -99 SPO 1997 04 22 19 44 95 4.2 -9 669.30 -67.3 -61.5 -67.3 54 -99 SPO 1997 04 22 19 45 95 4.1 -9 669.30 -67.4 -61.5 -67.4 55 -99 SPO 1997 04 22 19 46 97 4.2 -9 669.30 -67.4 -61.5 -67.4 54 -99 SPO 1997 04 22 19 47 97 4.0 -9 669.30 -67.4 -61.6 -67.4 54 -99 SPO 1997 04 22 19 48 98 3.9 -9 669.30 -67.4 -61.6 -67.4 54 -99 SPO 1997 04 22 19 49 98 4.0 -9 669.30 -67.4 -61.6 -67.4 55 -99 SPO 1997 04 22 19 50 98 4.1 -9 669.30 -67.4 -61.4 -67.4 56 -99 SPO 1997 04 22 19 51 99 4.2 -9 669.20 -67.4 -61.3 -67.4 56 -99 SPO 1997 04 22 19 52 99 4.2 -9 669.30 -67.4 -61.2 -67.4 54 -99 SPO 1997 04 22 19 53 98 4.2 -9 669.20 -67.5 -61.4 -67.5 54 -99 SPO 1997 04 22 19 54 97 4.2 -9 669.30 -67.6 -61.5 -67.5 54 -99 SPO 1997 04 22 19 55 98 4.0 -9 669.30 -67.7 -61.6 -67.6 55 -99 SPO 1997 04 22 19 56 98 3.9 -9 669.30 -67.7 -61.7 -67.6 54 -99 SPO 1997 04 22 19 57 97 4.0 -9 669.30 -67.8 -61.7 -67.6 55 -99 SPO 1997 04 22 19 58 97 4.1 -9 669.30 -68.0 -61.7 -67.8 56 -99 SPO 1997 04 22 19 59 97 4.1 -9 669.30 -68.0 -61.6 -67.8 56 -99 SPO 1997 04 22 20 00 96 4.1 -9 669.30 -68.0 -61.6 -67.8 56 0 SPO 1997 04 22 20 01 96 4.1 -9 669.30 -68.0 -61.7 -67.8 55 -99 SPO 1997 04 22 20 02 97 4.0 -9 669.30 -68.0 -61.8 -67.8 55 -99 SPO 1997 04 22 20 03 98 3.9 -9 669.30 -67.9 -62.0 -67.8 54 -99 SPO 1997 04 22 20 04 98 4.0 -9 669.30 -67.9 -62.0 -67.8 53 -99 SPO 1997 04 22 20 05 97 4.1 -9 669.30 -67.9 -62.1 -67.8 53 -99 SPO 1997 04 22 20 06 96 4.2 -9 669.30 -67.9 -62.0 -67.7 53 -99 SPO 1997 04 22 20 07 96 4.2 -9 669.20 -67.8 -62.1 -67.6 52 -99 SPO 1997 04 22 20 08 95 4.2 -9 669.20 -67.7 -62.1 -67.6 52 -99 SPO 1997 04 22 20 09 95 4.1 -9 669.20 -67.6 -62.1 -67.6 52 -99 SPO 1997 04 22 20 10 95 4.2 -9 669.30 -67.5 -62.0 -67.5 53 -99 SPO 1997 04 22 20 11 95 4.2 -9 669.30 -67.4 -61.9 -67.4 53 -99 SPO 1997 04 22 20 12 95 4.1 -9 669.20 -67.3 -61.8 -67.4 53 -99 SPO 1997 04 22 20 13 94 4.1 -9 669.20 -67.3 -61.7 -67.4 54 -99 SPO 1997 04 22 20 14 94 4.2 -9 669.20 -67.2 -61.7 -67.3 53 -99 SPO 1997 04 22 20 15 94 4.2 -9 669.20 -67.2 -61.6 -67.3 54 -99 SPO 1997 04 22 20 16 93 4.3 -9 669.20 -67.1 -61.5 -67.3 53 -99 SPO 1997 04 22 20 17 92 4.3 -9 669.20 -67.1 -61.5 -67.3 53 -99 SPO 1997 04 22 20 18 92 4.2 -9 669.20 -67.1 -61.5 -67.3 53 -99 SPO 1997 04 22 20 19 92 4.3 -9 669.20 -67.1 -61.4 -67.3 53 -99 SPO 1997 04 22 20 20 93 4.3 -9 669.20 -67.1 -61.3 -67.3 53 -99 SPO 1997 04 22 20 21 93 4.4 -9 669.20 -67.2 -61.3 -67.3 54 -99 SPO 1997 04 22 20 22 92 4.5 -9 669.20 -67.2 -61.2 -67.3 55 -99 SPO 1997 04 22 20 23 91 4.4 -9 669.10 -67.3 -61.2 -67.4 56 -99 SPO 1997 04 22 20 24 91 4.3 -9 669.10 -67.3 -61.3 -67.4 56 -99 SPO 1997 04 22 20 25 91 4.3 -9 669.10 -67.3 -61.4 -67.4 56 -99 SPO 1997 04 22 20 26 91 4.2 -9 669.10 -67.2 -61.4 -67.4 55 -99 SPO 1997 04 22 20 27 92 4.2 -9 669.20 -67.2 -61.5 -67.3 55 -99 SPO 1997 04 22 20 28 92 4.2 -9 669.20 -67.2 -61.7 -67.4 55 -99 SPO 1997 04 22 20 29 92 4.2 -9 669.10 -67.3 -61.7 -67.4 55 -99 SPO 1997 04 22 20 30 91 4.2 -9 669.10 -67.4 -61.7 -67.5 55 -99 SPO 1997 04 22 20 31 91 4.2 -9 669.10 -67.4 -61.6 -67.5 55 -99 SPO 1997 04 22 20 32 90 4.2 -9 669.10 -67.5 -61.6 -67.5 56 -99 SPO 1997 04 22 20 33 90 4.1 -9 669.10 -67.5 -61.6 -67.5 56 -99 SPO 1997 04 22 20 34 90 4.0 -9 669.10 -67.5 -61.6 -67.6 56 -99 SPO 1997 04 22 20 35 90 3.9 -9 669.20 -67.6 -61.8 -67.6 56 -99 SPO 1997 04 22 20 36 90 3.8 -9 669.20 -67.7 -61.8 -67.6 57 -99 SPO 1997 04 22 20 37 90 3.9 -9 669.20 -67.7 -61.8 -67.7 56 -99 SPO 1997 04 22 20 38 90 4.0 -9 669.20 -67.8 -61.8 -67.7 56 -99 SPO 1997 04 22 20 39 90 4.0 -9 669.10 -67.8 -61.8 -67.7 55 -99 SPO 1997 04 22 20 40 91 4.1 -9 669.10 -68.0 -61.8 -67.8 55 -99 SPO 1997 04 22 20 41 92 4.2 -9 669.10 -68.0 -61.7 -67.8 55 -99 SPO 1997 04 22 20 42 93 4.2 -9 669.00 -68.2 -61.6 -67.9 55 -99 SPO 1997 04 22 20 43 94 4.0 -9 669.00 -68.3 -61.6 -68.0 56 -99 SPO 1997 04 22 20 44 94 4.0 -9 669.00 -68.3 -61.8 -68.1 56 -99 SPO 1997 04 22 20 45 94 4.0 -9 669.00 -68.3 -61.9 -68.1 56 -99 SPO 1997 04 22 20 46 93 4.0 -9 669.00 -68.3 -62.0 -68.1 56 -99 SPO 1997 04 22 20 47 93 4.0 -9 669.00 -68.4 -61.9 -68.1 57 -99 SPO 1997 04 22 20 48 93 4.0 -9 669.00 -68.4 -61.9 -68.1 56 -99 SPO 1997 04 22 20 49 94 3.9 -9 669.00 -68.4 -61.9 -68.2 56 -99 SPO 1997 04 22 20 50 93 4.0 -9 669.00 -68.4 -61.9 -68.2 56 -99 SPO 1997 04 22 20 51 92 4.1 -9 669.00 -68.5 -61.9 -68.2 57 -99 SPO 1997 04 22 20 52 93 4.0 -9 669.00 -68.5 -61.9 -68.3 56 -99 SPO 1997 04 22 20 53 94 4.1 -9 669.00 -68.5 -61.9 -68.3 56 -99 SPO 1997 04 22 20 54 94 4.2 -9 669.00 -68.6 -62.0 -68.4 56 -99 SPO 1997 04 22 20 55 94 4.2 -9 669.00 -68.7 -61.9 -68.4 57 -99 SPO 1997 04 22 20 56 93 4.1 -9 669.00 -68.7 -62.0 -68.5 57 -99 SPO 1997 04 22 20 57 93 4.0 -9 669.00 -68.8 -62.0 -68.6 57 -99 SPO 1997 04 22 20 58 94 3.9 -9 669.00 -68.8 -62.0 -68.6 57 -99 SPO 1997 04 22 20 59 94 4.0 -9 669.00 -68.8 -62.0 -68.6 57 -99 SPO 1997 04 22 21 00 94 4.0 -9 669.00 -68.7 -61.9 -68.6 55 0 SPO 1997 04 22 21 01 96 4.0 -9 669.00 -68.7 -61.8 -68.6 55 -99 SPO 1997 04 22 21 02 96 4.1 -9 669.00 -68.8 -61.9 -68.7 56 -99 SPO 1997 04 22 21 03 95 4.1 -9 669.00 -68.8 -61.9 -68.7 55 -99 SPO 1997 04 22 21 04 95 4.2 -9 669.00 -68.8 -62.0 -68.8 55 -99 SPO 1997 04 22 21 05 94 4.2 -9 669.00 -68.8 -61.9 -68.8 55 -99 SPO 1997 04 22 21 06 94 4.2 -9 669.00 -68.8 -61.8 -68.8 55 -99 SPO 1997 04 22 21 07 94 4.1 -9 669.00 -68.8 -61.8 -68.7 55 -99 SPO 1997 04 22 21 08 96 4.0 -9 669.00 -68.8 -61.7 -68.7 56 -99 SPO 1997 04 22 21 09 96 4.0 -9 669.00 -68.8 -61.7 -68.7 56 -99 SPO 1997 04 22 21 10 96 4.1 -9 669.00 -68.6 -61.6 -68.7 55 -99 SPO 1997 04 22 21 11 97 4.2 -9 668.90 -68.6 -61.5 -68.6 55 -99 SPO 1997 04 22 21 12 98 4.3 -9 668.90 -68.7 -61.4 -68.7 55 -99 SPO 1997 04 22 21 13 98 4.3 -9 668.90 -68.7 -61.4 -68.7 55 -99 SPO 1997 04 22 21 14 98 4.3 -9 668.90 -68.7 -61.5 -68.7 54 -99 SPO 1997 04 22 21 15 98 4.3 -9 668.90 -68.7 -61.5 -68.7 54 -99 SPO 1997 04 22 21 16 96 4.4 -9 668.90 -68.8 -61.5 -68.8 54 -99 SPO 1997 04 22 21 17 96 4.4 -9 668.90 -68.8 -61.4 -68.8 54 -99 SPO 1997 04 22 21 18 96 4.4 -9 668.90 -68.8 -61.3 -68.8 55 -99 SPO 1997 04 22 21 19 97 4.3 -9 668.90 -68.7 -61.4 -68.8 55 -99 SPO 1997 04 22 21 20 98 4.3 -9 668.90 -68.8 -61.4 -68.8 55 -99 SPO 1997 04 22 21 21 98 4.3 -9 668.90 -68.7 -61.3 -68.7 55 -99 SPO 1997 04 22 21 22 98 4.3 -9 668.90 -68.7 -61.3 -68.7 55 -99 SPO 1997 04 22 21 23 97 4.4 -9 668.90 -68.8 -61.4 -68.8 55 -99 SPO 1997 04 22 21 24 97 4.5 -9 668.90 -68.8 -61.5 -68.8 55 -99 SPO 1997 04 22 21 25 98 4.4 -9 668.90 -68.9 -61.6 -68.9 55 -99 SPO 1997 04 22 21 26 100 4.3 -9 668.90 -69.0 -61.6 -68.9 55 -99 SPO 1997 04 22 21 27 102 4.1 -9 668.90 -69.1 -61.6 -69.0 55 -99 SPO 1997 04 22 21 28 103 4.0 -9 668.90 -69.2 -61.8 -69.1 56 -99 SPO 1997 04 22 21 29 104 3.9 -9 669.00 -69.3 -62.0 -69.1 56 -99 SPO 1997 04 22 21 30 104 3.9 -9 669.00 -69.3 -62.0 -69.2 56 -99 SPO 1997 04 22 21 31 104 3.9 -9 669.00 -69.2 -61.8 -69.2 55 -99 SPO 1997 04 22 21 32 104 3.9 -9 668.90 -69.2 -61.7 -69.1 55 -99 SPO 1997 04 22 21 33 105 3.9 -9 669.00 -69.1 -61.7 -69.1 54 -99 SPO 1997 04 22 21 34 106 3.9 -9 669.00 -69.0 -61.6 -69.0 53 -99 SPO 1997 04 22 21 35 105 4.0 -9 668.90 -68.9 -61.5 -68.9 53 -99 SPO 1997 04 22 21 36 103 4.2 -9 668.90 -68.7 -61.4 -68.7 52 -99 SPO 1997 04 22 21 37 102 4.2 -9 668.90 -68.6 -61.3 -68.6 52 -99 SPO 1997 04 22 21 38 101 4.4 -9 668.90 -68.4 -61.3 -68.5 51 -99 SPO 1997 04 22 21 39 100 4.5 -9 668.80 -68.3 -61.2 -68.5 51 -99 SPO 1997 04 22 21 40 100 4.5 -9 668.80 -68.2 -61.1 -68.4 52 -99 SPO 1997 04 22 21 41 99 4.4 -9 668.80 -68.1 -61.0 -68.4 53 -99 SPO 1997 04 22 21 42 100 4.4 -9 668.80 -68.0 -61.2 -68.3 52 -99 SPO 1997 04 22 21 43 99 4.3 -9 668.80 -67.9 -61.4 -68.2 53 -99 SPO 1997 04 22 21 44 99 4.3 -9 668.80 -67.8 -61.3 -68.2 52 -99 SPO 1997 04 22 21 45 99 4.2 -9 668.80 -67.8 -61.3 -68.1 52 -99 SPO 1997 04 22 21 46 99 4.2 -9 668.80 -67.8 -61.3 -68.1 53 -99 SPO 1997 04 22 21 47 99 4.2 -9 668.80 -67.9 -61.4 -68.1 54 -99 SPO 1997 04 22 21 48 98 4.2 -9 668.80 -67.9 -61.5 -68.1 54 -99 SPO 1997 04 22 21 49 98 4.2 -9 668.80 -67.9 -61.6 -68.1 54 -99 SPO 1997 04 22 21 50 96 4.3 -9 668.80 -67.9 -61.4 -68.1 54 -99 SPO 1997 04 22 21 51 95 4.3 -9 668.80 -67.9 -61.2 -68.1 55 -99 SPO 1997 04 22 21 52 96 4.3 -9 668.80 -67.9 -61.3 -68.1 55 -99 SPO 1997 04 22 21 53 97 4.3 -9 668.80 -67.8 -61.4 -68.0 55 -99 SPO 1997 04 22 21 54 97 4.2 -9 668.80 -67.8 -61.5 -68.0 56 -99 SPO 1997 04 22 21 55 98 4.2 -9 668.80 -67.7 -61.5 -67.9 55 -99 SPO 1997 04 22 21 56 98 4.2 -9 668.80 -67.6 -61.6 -67.9 55 -99 SPO 1997 04 22 21 57 98 4.1 -9 668.80 -67.5 -61.7 -67.8 54 -99 SPO 1997 04 22 21 58 98 4.1 -9 668.80 -67.5 -61.8 -67.8 54 -99 SPO 1997 04 22 21 59 98 4.1 -9 668.80 -67.5 -61.8 -67.8 54 -99 SPO 1997 04 22 22 00 98 4.1 -9 668.80 -67.6 -61.8 -67.8 56 0 SPO 1997 04 22 22 01 97 4.2 -9 668.80 -67.6 -61.9 -67.8 56 -99 SPO 1997 04 22 22 02 96 4.3 -9 668.80 -67.6 -61.9 -67.8 56 -99 SPO 1997 04 22 22 03 95 4.3 -9 668.80 -67.6 -62.0 -67.8 56 -99 SPO 1997 04 22 22 04 95 4.4 -9 668.80 -67.6 -62.1 -67.7 57 -99 SPO 1997 04 22 22 05 96 4.3 -9 668.80 -67.6 -62.0 -67.7 58 -99 SPO 1997 04 22 22 06 98 4.2 -9 668.80 -67.5 -62.0 -67.7 57 -99 SPO 1997 04 22 22 07 98 4.1 -9 668.80 -67.5 -61.8 -67.7 57 -99 SPO 1997 04 22 22 08 98 4.0 -9 668.80 -67.5 -61.7 -67.7 57 -99 SPO 1997 04 22 22 09 98 3.9 -9 668.80 -67.6 -61.6 -67.8 57 -99 SPO 1997 04 22 22 10 98 3.8 -9 668.80 -67.7 -61.6 -67.8 58 -99 SPO 1997 04 22 22 11 99 3.8 -9 668.80 -67.8 -61.6 -67.9 58 -99 SPO 1997 04 22 22 12 99 3.8 -9 668.80 -67.9 -61.6 -67.9 58 -99 SPO 1997 04 22 22 13 99 3.9 -9 668.80 -68.0 -61.6 -68.0 59 -99 SPO 1997 04 22 22 14 98 4.0 -9 668.80 -68.2 -61.5 -68.1 59 -99 SPO 1997 04 22 22 15 97 4.1 -9 668.80 -68.2 -61.5 -68.1 59 -99 SPO 1997 04 22 22 16 95 4.1 -9 668.80 -68.2 -61.4 -68.1 59 -99 SPO 1997 04 22 22 17 94 4.1 -9 668.70 -68.2 -61.4 -68.1 59 -99 SPO 1997 04 22 22 18 95 4.0 -9 668.80 -68.2 -61.4 -68.1 58 -99 SPO 1997 04 22 22 19 95 4.0 -9 668.80 -68.2 -61.6 -68.1 58 -99 SPO 1997 04 22 22 20 96 4.1 -9 668.80 -68.1 -61.7 -68.1 56 -99 SPO 1997 04 22 22 21 97 4.1 -9 668.80 -68.1 -61.7 -68.1 56 -99 SPO 1997 04 22 22 22 98 4.2 -9 668.80 -68.1 -61.7 -68.1 56 -99 SPO 1997 04 22 22 23 98 4.1 -9 668.80 -68.0 -61.8 -68.1 55 -99 SPO 1997 04 22 22 24 97 4.2 -9 668.80 -68.0 -61.9 -68.1 56 -99 SPO 1997 04 22 22 25 97 4.2 -9 668.80 -68.0 -62.0 -68.1 56 -99 SPO 1997 04 22 22 26 98 4.2 -9 668.80 -68.1 -62.0 -68.1 57 -99 SPO 1997 04 22 22 27 99 4.0 -9 668.80 -68.1 -62.2 -68.2 56 -99 SPO 1997 04 22 22 28 100 3.9 -9 668.80 -68.2 -62.5 -68.2 57 -99 SPO 1997 04 22 22 29 101 3.9 -9 668.80 -68.3 -62.8 -68.2 58 -99 SPO 1997 04 22 22 30 100 3.8 -9 668.80 -68.3 -62.8 -68.2 58 -99 SPO 1997 04 22 22 31 97 4.0 -9 668.80 -68.3 -62.6 -68.2 57 -99 SPO 1997 04 22 22 32 96 4.1 -9 668.80 -68.3 -62.6 -68.2 57 -99 SPO 1997 04 22 22 33 95 4.1 -9 668.80 -68.3 -62.8 -68.2 56 -99 SPO 1997 04 22 22 34 94 4.3 -9 668.80 -68.2 -62.7 -68.2 55 -99 SPO 1997 04 22 22 35 94 4.4 -9 668.80 -68.2 -62.6 -68.2 55 -99 SPO 1997 04 22 22 36 94 4.4 -9 668.80 -68.1 -62.5 -68.1 55 -99 SPO 1997 04 22 22 37 93 4.3 -9 668.80 -67.9 -62.5 -68.1 55 -99 SPO 1997 04 22 22 38 92 4.3 -9 668.80 -67.8 -62.4 -68.0 55 -99 SPO 1997 04 22 22 39 91 4.3 -9 668.80 -67.7 -62.4 -67.9 55 -99 SPO 1997 04 22 22 40 91 4.2 -9 668.80 -67.6 -62.2 -67.9 55 -99 SPO 1997 04 22 22 41 92 4.1 -9 668.80 -67.6 -62.2 -67.9 55 -99 SPO 1997 04 22 22 42 91 4.1 -9 668.80 -67.7 -62.4 -67.9 56 -99 SPO 1997 04 22 22 43 93 4.0 -9 668.90 -67.7 -62.5 -67.9 56 -99 SPO 1997 04 22 22 44 94 3.9 -9 668.90 -67.8 -62.6 -68.0 56 -99 SPO 1997 04 22 22 45 96 3.9 -9 668.90 -67.9 -62.8 -68.0 56 -99 SPO 1997 04 22 22 46 96 3.9 -9 668.90 -68.0 -62.8 -68.1 57 -99 SPO 1997 04 22 22 47 96 3.9 -9 668.90 -68.1 -62.8 -68.1 58 -99 SPO 1997 04 22 22 48 96 4.1 -9 668.80 -68.1 -62.8 -68.2 57 -99 SPO 1997 04 22 22 49 94 4.1 -9 668.80 -68.2 -62.7 -68.2 58 -99 SPO 1997 04 22 22 50 95 4.0 -9 668.80 -68.2 -62.6 -68.2 58 -99 SPO 1997 04 22 22 51 95 4.0 -9 668.80 -68.1 -62.6 -68.2 56 -99 SPO 1997 04 22 22 52 93 4.0 -9 668.80 -68.1 -62.6 -68.2 55 -99 SPO 1997 04 22 22 53 92 4.0 -9 668.90 -68.1 -62.5 -68.2 55 -99 SPO 1997 04 22 22 54 91 4.0 -9 668.80 -68.1 -62.4 -68.2 55 -99 SPO 1997 04 22 22 55 92 4.0 -9 668.80 -68.0 -62.2 -68.1 54 -99 SPO 1997 04 22 22 56 92 4.0 -9 668.80 -68.0 -62.1 -68.1 55 -99 SPO 1997 04 22 22 57 91 4.0 -9 668.80 -67.9 -62.1 -68.1 55 -99 SPO 1997 04 22 22 58 90 4.0 -9 668.90 -67.8 -62.1 -68.0 55 -99 SPO 1997 04 22 22 59 90 4.0 -9 668.90 -67.8 -62.1 -68.0 56 -99 SPO 1997 04 22 23 00 90 4.0 -9 668.80 -67.7 -62.0 -67.9 56 0 SPO 1997 04 22 23 01 91 4.0 -9 668.80 -67.7 -61.8 -67.9 56 -99 SPO 1997 04 22 23 02 91 4.1 -9 668.80 -67.7 -61.8 -67.9 56 -99 SPO 1997 04 22 23 03 91 4.2 -9 668.80 -67.6 -61.7 -67.9 56 -99 SPO 1997 04 22 23 04 91 4.2 -9 668.80 -67.6 -61.7 -67.9 56 -99 SPO 1997 04 22 23 05 91 4.1 -9 668.80 -67.7 -61.6 -67.9 56 -99 SPO 1997 04 22 23 06 92 4.0 -9 668.80 -67.7 -61.7 -67.9 56 -99 SPO 1997 04 22 23 07 93 4.0 -9 668.80 -67.6 -61.6 -67.9 55 -99 SPO 1997 04 22 23 08 93 3.9 -9 668.80 -67.6 -61.7 -67.9 55 -99 SPO 1997 04 22 23 09 93 3.9 -9 668.80 -67.6 -61.8 -67.9 56 -99 SPO 1997 04 22 23 10 93 3.8 -9 668.80 -67.7 -61.8 -67.9 56 -99 SPO 1997 04 22 23 11 94 3.9 -9 668.80 -67.7 -61.9 -67.9 56 -99 SPO 1997 04 22 23 12 93 3.9 -9 668.80 -67.7 -62.0 -67.9 56 -99 SPO 1997 04 22 23 13 93 4.0 -9 668.80 -67.8 -62.0 -67.9 57 -99 SPO 1997 04 22 23 14 93 4.0 -9 668.80 -67.8 -62.0 -67.9 56 -99 SPO 1997 04 22 23 15 92 4.1 -9 668.80 -67.8 -62.1 -67.9 56 -99 SPO 1997 04 22 23 16 92 4.1 -9 668.70 -67.9 -62.1 -67.9 57 -99 SPO 1997 04 22 23 17 91 4.2 -9 668.70 -67.8 -62.1 -67.9 56 -99 SPO 1997 04 22 23 18 92 4.3 -9 668.70 -67.8 -62.1 -67.9 56 -99 SPO 1997 04 22 23 19 91 4.3 -9 668.70 -67.8 -62.1 -67.9 56 -99 SPO 1997 04 22 23 20 90 4.3 -9 668.70 -67.6 -62.1 -67.8 55 -99 SPO 1997 04 22 23 21 90 4.4 -9 668.60 -67.6 -62.0 -67.8 56 -99 SPO 1997 04 22 23 22 89 4.4 -9 668.60 -67.5 -61.8 -67.8 56 -99 SPO 1997 04 22 23 23 88 4.4 -9 668.60 -67.5 -61.8 -67.7 56 -99 SPO 1997 04 22 23 24 88 4.3 -9 668.60 -67.5 -62.0 -67.7 56 -99 SPO 1997 04 22 23 25 88 4.2 -9 668.60 -67.5 -62.1 -67.7 57 -99 SPO 1997 04 22 23 26 88 4.1 -9 668.60 -67.5 -62.1 -67.7 57 -99 SPO 1997 04 22 23 27 88 4.1 -9 668.60 -67.5 -62.2 -67.7 57 -99 SPO 1997 04 22 23 28 87 4.1 -9 668.60 -67.5 -62.2 -67.7 57 -99 SPO 1997 04 22 23 29 86 4.1 -9 668.60 -67.5 -62.1 -67.6 57 -99 SPO 1997 04 22 23 30 86 4.0 -9 668.60 -67.5 -62.1 -67.6 57 -99 SPO 1997 04 22 23 31 87 3.9 -9 668.60 -67.4 -62.2 -67.6 57 -99 SPO 1997 04 22 23 32 89 3.9 -9 668.60 -67.4 -62.3 -67.6 57 -99 SPO 1997 04 22 23 33 88 4.0 -9 668.60 -67.4 -62.2 -67.6 57 -99 SPO 1997 04 22 23 34 88 4.1 -9 668.60 -67.4 -62.2 -67.6 57 -99 SPO 1997 04 22 23 35 88 4.1 -9 668.60 -67.4 -62.2 -67.6 57 -99 SPO 1997 04 22 23 36 89 4.0 -9 668.60 -67.4 -62.1 -67.7 56 -99 SPO 1997 04 22 23 37 89 3.9 -9 668.60 -67.5 -62.3 -67.7 57 -99 SPO 1997 04 22 23 38 89 3.8 -9 668.60 -67.5 -62.4 -67.7 56 -99 SPO 1997 04 22 23 39 89 3.7 -9 668.60 -67.6 -62.5 -67.7 57 -99 SPO 1997 04 22 23 40 90 3.6 -9 668.60 -67.6 -62.6 -67.8 57 -99 SPO 1997 04 22 23 41 92 3.5 -9 668.60 -67.6 -62.7 -67.8 57 -99 SPO 1997 04 22 23 42 93 3.6 -9 668.60 -67.7 -62.8 -67.8 58 -99 SPO 1997 04 22 23 43 94 3.5 -9 668.60 -67.7 -62.8 -67.8 59 -99 SPO 1997 04 22 23 44 94 3.5 -9 668.60 -67.8 -62.9 -67.8 59 -99 SPO 1997 04 22 23 45 95 3.5 -9 668.60 -67.8 -62.9 -67.8 59 -99 SPO 1997 04 22 23 46 94 3.5 -9 668.60 -67.8 -62.9 -67.9 58 -99 SPO 1997 04 22 23 47 94 3.5 -9 668.60 -67.8 -62.9 -67.9 57 -99 SPO 1997 04 22 23 48 95 3.5 -9 668.60 -67.7 -62.9 -67.9 56 -99 SPO 1997 04 22 23 49 97 3.3 -9 668.60 -67.7 -62.9 -67.8 56 -99 SPO 1997 04 22 23 50 99 3.3 -9 668.60 -67.7 -62.9 -67.8 55 -99 SPO 1997 04 22 23 51 99 3.3 -9 668.60 -67.7 -63.0 -67.9 55 -99 SPO 1997 04 22 23 52 99 3.4 -9 668.60 -67.8 -63.1 -67.9 56 -99 SPO 1997 04 22 23 53 99 3.4 -9 668.60 -67.9 -63.2 -67.9 57 -99 SPO 1997 04 22 23 54 99 3.3 -9 668.60 -67.9 -63.2 -67.9 57 -99 SPO 1997 04 22 23 55 99 3.3 -9 668.60 -67.8 -63.1 -67.9 56 -99 SPO 1997 04 22 23 56 100 3.2 -9 668.60 -67.9 -63.2 -67.9 57 -99 SPO 1997 04 22 23 57 102 3.1 -9 668.60 -67.9 -63.2 -67.9 57 -99 SPO 1997 04 22 23 58 103 3.1 -9 668.60 -67.9 -63.3 -67.9 -99 -99 SPO 1997 04 22 23 59 105 3.2 -9 668.60 -67.9 -63.3 -67.9 -99 -99 SPO 1997 04 23 00 00 106 3.3 -9 668.60 -68.0 -63.4 -67.9 -99 0 SPO 1997 04 23 00 01 108 3.2 -9 668.60 -67.9 -63.6 -67.9 -99 -99 SPO 1997 04 23 00 02 107 3.2 -9 668.60 -68.0 -63.7 -68.0 -99 -99 SPO 1997 04 23 00 03 107 3.2 -9 668.60 -68.0 -63.8 -68.0 -99 -99 SPO 1997 04 23 00 04 106 3.1 -9 668.60 -68.1 -63.8 -68.1 -99 -99 SPO 1997 04 23 00 05 105 3.1 -9 668.60 -68.2 -63.9 -68.1 -99 -99 SPO 1997 04 23 00 06 105 3.2 -9 668.60 -68.2 -63.8 -68.2 -99 -99 SPO 1997 04 23 00 07 103 3.1 -9 668.60 -68.4 -63.9 -68.3 -99 -99 SPO 1997 04 23 00 08 103 3.1 -9 668.60 -68.6 -63.9 -68.4 -99 -99 SPO 1997 04 23 00 09 104 3.1 -9 668.60 -68.7 -64.0 -68.4 -99 -99 SPO 1997 04 23 00 10 104 3.0 -9 668.60 -68.8 -64.0 -68.5 -99 -99 SPO 1997 04 23 00 11 104 2.9 -9 668.60 -68.9 -63.9 -68.6 -99 -99 SPO 1997 04 23 00 12 104 3.0 -9 668.60 -69.0 -63.9 -68.7 -99 -99 SPO 1997 04 23 00 13 103 3.0 -9 668.60 -68.9 -63.8 -68.7 55 -99 SPO 1997 04 23 00 14 101 3.2 -9 668.60 -68.9 -63.7 -68.7 55 -99 SPO 1997 04 23 00 15 102 3.3 -9 668.60 -68.9 -63.7 -68.7 55 -99 SPO 1997 04 23 00 16 101 3.5 -9 668.60 -68.9 -63.6 -68.7 55 -99 SPO 1997 04 23 00 17 100 3.6 -9 668.60 -68.8 -63.4 -68.6 55 -99 SPO 1997 04 23 00 18 99 3.6 -9 668.60 -68.7 -63.4 -68.6 54 -99 SPO 1997 04 23 00 19 99 3.6 -9 668.60 -68.6 -63.3 -68.5 53 -99 SPO 1997 04 23 00 20 97 3.6 -9 668.60 -68.5 -63.4 -68.5 52 -99 SPO 1997 04 23 00 21 96 3.5 -9 668.60 -68.5 -63.5 -68.5 53 -99 SPO 1997 04 23 00 22 96 3.5 -9 668.60 -68.4 -63.6 -68.5 52 -99 SPO 1997 04 23 00 23 97 3.4 -9 668.60 -68.5 -63.7 -68.5 53 -99 SPO 1997 04 23 00 24 98 3.3 -9 668.60 -68.5 -63.8 -68.6 53 -99 SPO 1997 04 23 00 25 98 3.2 -9 668.60 -68.6 -63.8 -68.6 54 -99 SPO 1997 04 23 00 26 99 3.1 -9 668.60 -68.6 -63.9 -68.6 55 -99 SPO 1997 04 23 00 27 99 3.0 -9 668.60 -68.6 -64.0 -68.6 55 -99 SPO 1997 04 23 00 28 98 3.1 -9 668.60 -68.6 -64.0 -68.7 55 -99 SPO 1997 04 23 00 29 98 3.1 -9 668.60 -68.6 -64.1 -68.7 55 -99 SPO 1997 04 23 00 30 98 3.1 -9 668.60 -68.7 -64.1 -68.7 56 -99 SPO 1997 04 23 00 31 98 3.2 -9 668.60 -68.8 -64.1 -68.7 56 -99 SPO 1997 04 23 00 32 98 3.2 -9 668.60 -68.9 -64.1 -68.8 56 -99 SPO 1997 04 23 00 33 98 3.2 -9 668.60 -69.0 -64.1 -68.8 55 -99 SPO 1997 04 23 00 34 98 3.2 -9 668.60 -68.9 -64.2 -68.8 55 -99 SPO 1997 04 23 00 35 97 3.1 -9 668.60 -68.8 -64.2 -68.7 54 -99 SPO 1997 04 23 00 36 97 3.0 -9 668.60 -68.8 -64.3 -68.6 54 -99 SPO 1997 04 23 00 37 97 3.0 -9 668.60 -68.9 -64.3 -68.6 55 -99 SPO 1997 04 23 00 38 96 2.9 -9 668.60 -68.8 -64.3 -68.5 55 -99 SPO 1997 04 23 00 39 96 2.9 -9 668.60 -68.7 -64.2 -68.4 55 -99 SPO 1997 04 23 00 40 97 2.8 -9 668.60 -68.5 -64.2 -68.3 54 -99 SPO 1997 04 23 00 41 99 2.8 -9 668.60 -68.4 -64.1 -68.2 54 -99 SPO 1997 04 23 00 42 101 2.7 -9 668.60 -68.3 -64.1 -68.2 54 -99 SPO 1997 04 23 00 43 104 2.7 -9 668.60 -68.4 -64.1 -68.2 55 -99 SPO 1997 04 23 00 44 104 2.7 -9 668.70 -68.2 -64.1 -68.0 53 -99 SPO 1997 04 23 00 45 105 2.7 -9 668.60 -68.0 -64.1 -67.9 52 -99 SPO 1997 04 23 00 46 105 2.7 -9 668.60 -68.0 -64.0 -67.9 53 -99 SPO 1997 04 23 00 47 104 2.7 -9 668.60 -68.0 -64.0 -67.8 52 -99 SPO 1997 04 23 00 48 104 2.8 -9 668.60 -68.2 -63.9 -67.9 54 -99 SPO 1997 04 23 00 49 104 2.9 -9 668.60 -68.2 -63.9 -68.0 54 -99 SPO 1997 04 23 00 50 104 2.9 -9 668.60 -68.2 -64.0 -68.0 55 -99 SPO 1997 04 23 00 51 106 2.9 -9 668.60 -68.2 -64.0 -68.0 55 -99 SPO 1997 04 23 00 52 107 2.9 -9 668.60 -68.2 -64.2 -68.0 55 -99 SPO 1997 04 23 00 53 107 2.9 -9 668.60 -68.3 -64.1 -68.2 56 -99 SPO 1997 04 23 00 54 107 3.0 -9 668.60 -68.5 -64.2 -68.3 57 -99 SPO 1997 04 23 00 55 107 3.1 -9 668.60 -68.4 -64.2 -68.3 55 -99 SPO 1997 04 23 00 56 106 3.2 -9 668.60 -68.4 -64.2 -68.4 55 -99 SPO 1997 04 23 00 57 107 3.2 -9 668.60 -68.5 -64.2 -68.4 55 -99 SPO 1997 04 23 00 58 109 3.1 -9 668.60 -68.5 -64.2 -68.4 55 -99 SPO 1997 04 23 00 59 110 3.0 -9 668.60 -68.6 -64.4 -68.5 55 -99 SPO 1997 04 23 01 00 110 3.0 -9 668.60 -68.6 -64.4 -68.5 55 0 SPO 1997 04 23 01 01 110 3.0 -9 668.60 -68.6 -64.4 -68.6 55 -99 SPO 1997 04 23 01 02 112 3.0 -9 668.50 -68.7 -64.4 -68.6 56 -99 SPO 1997 04 23 01 03 116 2.9 -9 668.50 -68.7 -64.5 -68.6 57 -99 SPO 1997 04 23 01 04 116 3.0 -9 668.50 -68.8 -64.5 -68.7 58 -99 SPO 1997 04 23 01 05 116 3.0 -9 668.50 -68.8 -64.6 -68.7 57 -99 SPO 1997 04 23 01 06 116 3.2 -9 668.50 -68.9 -64.6 -68.8 57 -99 SPO 1997 04 23 01 07 116 3.3 -9 668.50 -68.9 -64.6 -68.8 57 -99 SPO 1997 04 23 01 08 117 3.2 -9 668.50 -68.8 -64.6 -68.8 55 -99 SPO 1997 04 23 01 09 116 3.3 -9 668.50 -68.8 -64.7 -68.8 55 -99 SPO 1997 04 23 01 10 114 3.3 -9 668.50 -68.7 -64.6 -68.8 55 -99 SPO 1997 04 23 01 11 112 3.2 -9 668.50 -68.7 -64.5 -68.7 55 -99 SPO 1997 04 23 01 12 112 3.2 -9 668.50 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 13 112 3.2 -9 668.50 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 14 112 3.1 -9 668.50 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 15 112 3.0 -9 668.50 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 16 109 3.0 -9 668.40 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 17 107 2.9 -9 668.40 -68.6 -64.6 -68.7 55 -99 SPO 1997 04 23 01 18 106 3.0 -9 668.40 -68.7 -64.6 -68.7 55 -99 SPO 1997 04 23 01 19 106 3.0 -9 668.40 -68.7 -64.6 -68.7 55 -99 SPO 1997 04 23 01 20 106 2.9 -9 668.40 -68.7 -64.6 -68.7 55 -99 SPO 1997 04 23 01 21 106 3.0 -9 668.40 -68.7 -64.7 -68.7 55 -99 SPO 1997 04 23 01 22 106 3.1 -9 668.40 -68.7 -64.6 -68.7 55 -99 SPO 1997 04 23 01 23 106 3.1 -9 668.30 -68.8 -64.4 -68.8 55 -99 SPO 1997 04 23 01 24 105 3.2 -9 668.30 -68.7 -64.4 -68.7 55 -99 SPO 1997 04 23 01 25 105 3.2 -9 668.30 -68.6 -64.3 -68.7 55 -99 SPO 1997 04 23 01 26 103 3.2 -9 668.30 -68.6 -64.3 -68.7 55 -99 SPO 1997 04 23 01 27 104 3.2 -9 668.30 -68.7 -64.4 -68.7 56 -99 SPO 1997 04 23 01 28 105 3.0 -9 668.40 -68.6 -64.4 -68.7 55 -99 SPO 1997 04 23 01 29 108 2.9 -9 668.40 -68.7 -64.5 -68.7 54 -99 SPO 1997 04 23 01 30 110 2.8 -9 668.40 -68.6 -64.6 -68.7 53 -99 SPO 1997 04 23 01 31 112 2.7 -9 668.40 -68.6 -64.6 -68.7 54 -99 SPO 1997 04 23 01 32 115 2.6 -9 668.50 -68.4 -64.6 -68.6 53 -99 SPO 1997 04 23 01 33 116 2.5 -9 668.50 -68.2 -64.7 -68.4 52 -99 SPO 1997 04 23 01 34 116 2.7 -9 668.50 -68.1 -64.7 -68.3 53 -99 SPO 1997 04 23 01 35 113 2.8 -9 668.40 -68.2 -64.6 -68.4 55 -99 SPO 1997 04 23 01 36 110 2.9 -9 668.40 -68.3 -64.4 -68.4 55 -99 SPO 1997 04 23 01 37 110 2.8 -9 668.40 -68.3 -64.3 -68.4 55 -99 SPO 1997 04 23 01 38 113 2.7 -9 668.40 -68.4 -64.3 -68.5 56 -99 SPO 1997 04 23 01 39 114 2.6 -9 668.40 -68.5 -64.4 -68.6 56 -99 SPO 1997 04 23 01 40 116 2.7 -9 668.50 -68.4 -64.5 -68.5 55 -99 SPO 1997 04 23 01 41 117 2.8 -9 668.50 -67.8 -64.5 -68.2 52 -99 SPO 1997 04 23 01 42 119 2.9 -9 668.50 -67.6 -64.4 -67.9 52 -99 SPO 1997 04 23 01 43 119 3.0 -9 668.50 -67.6 -64.5 -67.9 53 -99 SPO 1997 04 23 01 44 119 2.9 -9 668.50 -68.0 -64.5 -68.1 56 -99 SPO 1997 04 23 01 45 117 2.9 -9 668.40 -68.4 -64.5 -68.4 59 -99 SPO 1997 04 23 01 46 113 3.0 -9 668.40 -68.8 -64.5 -68.6 61 -99 SPO 1997 04 23 01 47 111 3.2 -9 668.40 -69.0 -64.5 -68.8 61 -99 SPO 1997 04 23 01 48 111 3.3 -9 668.40 -69.1 -64.4 -68.9 60 -99 SPO 1997 04 23 01 49 111 3.3 -9 668.40 -69.2 -64.4 -69.0 60 -99 SPO 1997 04 23 01 50 112 3.3 -9 668.40 -69.1 -64.6 -69.0 58 -99 SPO 1997 04 23 01 51 114 3.3 -9 668.40 -69.1 -64.7 -68.9 58 -99 SPO 1997 04 23 01 52 115 3.2 -9 668.40 -69.0 -64.8 -68.9 57 -99 SPO 1997 04 23 01 53 115 3.2 -9 668.40 -69.0 -64.9 -68.9 57 -99 SPO 1997 04 23 01 54 114 3.2 -9 668.40 -69.0 -64.8 -68.9 56 -99 SPO 1997 04 23 01 55 112 3.2 -9 668.30 -69.1 -64.6 -69.0 57 -99 SPO 1997 04 23 01 56 109 3.4 -9 668.30 -69.1 -64.5 -69.0 56 -99 SPO 1997 04 23 01 57 108 3.4 -9 668.30 -69.0 -64.4 -69.0 55 -99 SPO 1997 04 23 01 58 107 3.4 -9 668.30 -69.0 -64.4 -69.0 55 -99 SPO 1997 04 23 01 59 106 3.3 -9 668.30 -69.0 -64.5 -69.0 55 -99 SPO 1997 04 23 02 00 106 3.3 -9 668.30 -69.0 -64.5 -69.0 56 0 SPO 1997 04 23 02 01 106 3.1 -9 668.40 -69.0 -64.5 -69.0 56 -99 SPO 1997 04 23 02 02 107 3.0 -9 668.30 -69.0 -64.6 -69.0 56 -99 SPO 1997 04 23 02 03 108 3.0 -9 668.30 -68.9 -64.7 -69.0 55 -99 SPO 1997 04 23 02 04 107 2.9 -9 668.30 -69.0 -64.8 -69.0 57 -99 SPO 1997 04 23 02 05 106 3.0 -9 668.30 -69.2 -64.8 -69.1 58 -99 SPO 1997 04 23 02 06 105 2.9 -9 668.30 -69.3 -64.7 -69.1 58 -99 SPO 1997 04 23 02 07 105 2.8 -9 668.30 -69.4 -64.7 -69.2 58 -99 SPO 1997 04 23 02 08 105 2.9 -9 668.30 -69.4 -64.7 -69.2 58 -99 SPO 1997 04 23 02 09 105 3.0 -9 668.30 -69.4 -64.7 -69.2 58 -99 SPO 1997 04 23 02 10 105 2.9 -9 668.30 -69.3 -64.7 -69.2 57 -99 SPO 1997 04 23 02 11 103 3.1 -9 668.30 -69.3 -64.7 -69.2 57 -99 SPO 1997 04 23 02 12 102 3.1 -9 668.30 -69.4 -64.6 -69.3 57 -99 SPO 1997 04 23 02 13 101 3.1 -9 668.30 -69.5 -64.7 -69.3 58 -99 SPO 1997 04 23 02 14 100 3.2 -9 668.20 -69.5 -64.7 -69.3 57 -99 SPO 1997 04 23 02 15 98 3.1 -9 668.30 -69.4 -64.7 -69.3 56 -99 SPO 1997 04 23 02 16 97 3.1 -9 668.30 -69.4 -64.7 -69.3 56 -99 SPO 1997 04 23 02 17 95 3.1 -9 668.30 -69.4 -64.6 -69.3 56 -99 SPO 1997 04 23 02 18 95 3.0 -9 668.30 -69.3 -64.7 -69.3 55 -99 SPO 1997 04 23 02 19 96 2.9 -9 668.30 -69.3 -64.7 -69.3 56 -99 SPO 1997 04 23 02 20 96 3.0 -9 668.20 -69.2 -64.6 -69.2 56 -99 SPO 1997 04 23 02 21 96 3.0 -9 668.20 -69.2 -64.4 -69.2 57 -99 SPO 1997 04 23 02 22 97 3.0 -9 668.20 -69.1 -64.4 -69.2 57 -99 SPO 1997 04 23 02 23 99 3.0 -9 668.20 -69.0 -64.5 -69.1 56 -99 SPO 1997 04 23 02 24 100 2.9 -9 668.20 -69.0 -64.6 -69.1 55 -99 SPO 1997 04 23 02 25 100 2.9 -9 668.20 -69.1 -64.7 -69.1 56 -99 SPO 1997 04 23 02 26 99 2.9 -9 668.20 -69.1 -64.7 -69.1 56 -99 SPO 1997 04 23 02 27 99 2.8 -9 668.20 -69.1 -64.6 -69.1 56 -99 SPO 1997 04 23 02 28 99 2.9 -9 668.20 -69.0 -64.5 -69.1 55 -99 SPO 1997 04 23 02 29 99 2.9 -9 668.20 -69.0 -64.4 -69.1 55 -99 SPO 1997 04 23 02 30 99 3.0 -9 668.10 -68.9 -64.3 -69.0 55 -99 SPO 1997 04 23 02 31 98 3.1 -9 668.10 -68.9 -64.3 -69.0 55 -99 SPO 1997 04 23 02 32 96 3.2 -9 668.10 -69.0 -64.2 -69.0 56 -99 SPO 1997 04 23 02 33 95 3.3 -9 668.00 -69.0 -64.2 -69.0 57 -99 SPO 1997 04 23 02 34 95 3.3 -9 668.00 -68.8 -64.0 -69.0 55 -99 SPO 1997 04 23 02 35 96 3.3 -9 668.00 -68.8 -63.8 -68.9 55 -99 SPO 1997 04 23 02 36 97 3.2 -9 668.00 -68.7 -63.5 -68.9 53 -99 SPO 1997 04 23 02 37 97 3.1 -9 668.00 -68.6 -63.4 -68.9 52 -99 SPO 1997 04 23 02 38 97 3.1 -9 668.00 -68.6 -63.4 -68.9 52 -99 SPO 1997 04 23 02 39 96 3.1 -9 668.00 -68.6 -63.4 -68.9 52 -99 SPO 1997 04 23 02 40 96 3.0 -9 668.00 -68.6 -63.3 -68.9 53 -99 SPO 1997 04 23 02 41 97 3.0 -9 668.00 -68.8 -63.4 -68.9 55 -99 SPO 1997 04 23 02 42 98 2.9 -9 668.00 -68.8 -63.6 -69.0 55 -99 SPO 1997 04 23 02 43 100 2.9 -9 668.00 -68.9 -63.8 -69.0 56 -99 SPO 1997 04 23 02 44 102 2.8 -9 668.10 -68.8 -63.7 -69.0 55 -99 SPO 1997 04 23 02 45 102 2.7 -9 668.10 -68.8 -63.5 -69.0 55 -99 SPO 1997 04 23 02 46 102 2.7 -9 668.10 -68.8 -63.4 -69.0 55 -99 SPO 1997 04 23 02 47 104 2.5 -9 668.10 -68.9 -63.6 -69.0 55 -99 SPO 1997 04 23 02 48 106 2.6 -9 668.10 -69.0 -63.9 -69.1 56 -99 SPO 1997 04 23 02 49 107 2.6 -9 668.10 -69.0 -64.2 -69.1 55 -99 SPO 1997 04 23 02 50 106 2.7 -9 668.10 -69.0 -64.2 -69.0 55 -99 SPO 1997 04 23 02 51 107 2.6 -9 668.00 -69.0 -64.3 -69.0 55 -99 SPO 1997 04 23 02 52 107 2.6 -9 668.00 -69.1 -64.5 -69.0 55 -99 SPO 1997 04 23 02 53 105 2.6 -9 668.10 -69.1 -64.4 -69.1 55 -99 SPO 1997 04 23 02 54 105 2.4 -9 668.10 -69.1 -64.4 -69.1 56 -99 SPO 1997 04 23 02 55 103 2.6 -9 668.10 -69.1 -64.5 -69.0 56 -99 SPO 1997 04 23 02 56 103 2.5 -9 668.00 -69.0 -64.4 -69.0 55 -99 SPO 1997 04 23 02 57 103 2.5 -9 668.00 -68.9 -64.4 -68.9 55 -99 SPO 1997 04 23 02 58 106 2.6 -9 668.00 -68.8 -64.4 -68.8 54 -99 SPO 1997 04 23 02 59 108 2.6 -9 668.00 -68.6 -64.6 -68.7 52 -99 SPO 1997 04 23 03 00 107 2.6 -9 668.00 -68.4 -64.8 -68.7 51 0 SPO 1997 04 23 03 01 108 2.6 -9 668.00 -68.3 -64.8 -68.7 51 -99 SPO 1997 04 23 03 02 107 2.7 -9 668.00 -68.2 -64.7 -68.6 52 -99 SPO 1997 04 23 03 03 106 2.8 -9 667.90 -68.2 -64.6 -68.6 53 -99 SPO 1997 04 23 03 04 106 2.9 -9 667.90 -68.2 -64.4 -68.6 53 -99 SPO 1997 04 23 03 05 105 2.9 -9 667.90 -68.2 -64.2 -68.5 54 -99 SPO 1997 04 23 03 06 106 2.9 -9 667.90 -68.4 -64.0 -68.6 55 -99 SPO 1997 04 23 03 07 107 2.8 -9 667.90 -68.7 -64.0 -68.6 57 -99 SPO 1997 04 23 03 08 106 2.8 -9 667.90 -68.8 -64.1 -68.7 57 -99 SPO 1997 04 23 03 09 104 2.8 -9 667.90 -68.8 -64.2 -68.7 56 -99 SPO 1997 04 23 03 10 102 2.8 -9 667.90 -68.9 -64.2 -68.7 55 -99 SPO 1997 04 23 03 11 101 2.9 -9 667.90 -68.9 -64.1 -68.7 55 -99 SPO 1997 04 23 03 12 99 3.0 -9 667.90 -68.8 -63.8 -68.7 54 -99 SPO 1997 04 23 03 13 98 3.0 -9 667.90 -68.8 -63.5 -68.6 53 -99 SPO 1997 04 23 03 14 98 3.0 -9 667.90 -68.9 -63.2 -68.6 54 -99 SPO 1997 04 23 03 15 100 2.9 -9 667.90 -69.0 -63.3 -68.7 55 -99 SPO 1997 04 23 03 16 101 2.9 -9 667.90 -69.1 -63.7 -68.8 55 -99 SPO 1997 04 23 03 17 101 2.9 -9 667.90 -69.1 -64.2 -68.8 55 -99 SPO 1997 04 23 03 18 101 2.9 -9 667.90 -69.0 -64.4 -68.8 55 -99 SPO 1997 04 23 03 19 104 2.7 -9 667.90 -68.8 -64.4 -68.6 52 -99 SPO 1997 04 23 03 20 107 2.7 -9 667.90 -68.5 -64.6 -68.6 50 -99 SPO 1997 04 23 03 21 108 2.6 -9 667.90 -68.3 -64.7 -68.4 50 -99 SPO 1997 04 23 03 22 107 2.6 -9 667.90 -68.2 -64.9 -68.4 50 -99 SPO 1997 04 23 03 23 106 2.6 -9 667.90 -68.5 -65.0 -68.5 53 -99 SPO 1997 04 23 03 24 105 2.5 -9 667.90 -68.6 -65.0 -68.6 53 -99 SPO 1997 04 23 03 25 105 2.4 -9 667.90 -68.8 -65.1 -68.6 55 -99 SPO 1997 04 23 03 26 105 2.4 -9 667.90 -68.8 -65.2 -68.7 55 -99 SPO 1997 04 23 03 27 105 2.4 -9 667.90 -68.8 -65.2 -68.8 55 -99 SPO 1997 04 23 03 28 107 2.4 -9 667.90 -68.9 -65.2 -68.8 55 -99 SPO 1997 04 23 03 29 108 2.4 -9 667.90 -68.9 -65.2 -68.8 55 -99 SPO 1997 04 23 03 30 108 2.5 -9 667.90 -68.8 -65.4 -68.7 55 -99 SPO 1997 04 23 03 31 107 2.4 -9 667.90 -68.7 -65.4 -68.6 54 -99 SPO 1997 04 23 03 32 106 2.4 -9 667.90 -68.7 -65.4 -68.6 54 -99 SPO 1997 04 23 03 33 102 2.5 -9 667.90 -68.6 -65.3 -68.5 53 -99 SPO 1997 04 23 03 34 101 2.5 -9 667.80 -68.4 -65.2 -68.5 52 -99 SPO 1997 04 23 03 35 99 2.6 -9 667.80 -68.3 -65.2 -68.4 51 -99 SPO 1997 04 23 03 36 97 2.7 -9 667.80 -68.2 -65.2 -68.4 52 -99 SPO 1997 04 23 03 37 98 2.6 -9 667.80 -68.2 -65.2 -68.3 53 -99 SPO 1997 04 23 03 38 99 2.6 -9 667.80 -68.4 -65.3 -68.4 55 -99 SPO 1997 04 23 03 39 99 2.5 -9 667.80 -68.7 -65.4 -68.6 56 -99 SPO 1997 04 23 03 40 100 2.5 -9 667.90 -68.9 -65.4 -68.7 57 -99 SPO 1997 04 23 03 41 101 2.6 -9 667.80 -69.0 -65.5 -68.8 57 -99 SPO 1997 04 23 03 42 102 2.6 -9 667.80 -69.0 -65.4 -68.8 56 -99 SPO 1997 04 23 03 43 101 2.6 -9 667.80 -68.8 -65.4 -68.7 54 -99 SPO 1997 04 23 03 44 101 2.6 -9 667.80 -68.6 -65.2 -68.6 52 -99 SPO 1997 04 23 03 45 101 2.6 -9 667.80 -68.4 -65.1 -68.4 52 -99 SPO 1997 04 23 03 46 99 2.8 -9 667.80 -68.3 -65.1 -68.3 52 -99 SPO 1997 04 23 03 47 98 2.7 -9 667.80 -68.3 -65.1 -68.3 52 -99 SPO 1997 04 23 03 48 97 2.7 -9 667.70 -68.3 -65.0 -68.3 53 -99 SPO 1997 04 23 03 49 97 2.8 -9 667.70 -68.4 -64.8 -68.3 55 -99 SPO 1997 04 23 03 50 98 2.7 -9 667.70 -68.6 -64.8 -68.4 56 -99 SPO 1997 04 23 03 51 98 2.7 -9 667.70 -68.6 -64.9 -68.5 57 -99 SPO 1997 04 23 03 52 97 2.8 -9 667.60 -68.8 -64.9 -68.5 58 -99 SPO 1997 04 23 03 53 97 2.7 -9 667.60 -68.8 -64.9 -68.6 58 -99 SPO 1997 04 23 03 54 98 2.5 -9 667.60 -68.9 -64.9 -68.7 58 -99 SPO 1997 04 23 03 55 100 2.5 -9 667.70 -68.9 -65.0 -68.8 57 -99 SPO 1997 04 23 03 56 102 2.4 -9 667.70 -69.0 -65.2 -68.8 57 -99 SPO 1997 04 23 03 57 103 2.3 -9 667.70 -69.0 -65.3 -68.9 57 -99 SPO 1997 04 23 03 58 104 2.4 -9 667.70 -68.9 -65.4 -68.8 55 -99 SPO 1997 04 23 03 59 101 2.5 -9 667.70 -68.7 -65.5 -68.6 54 -99 SPO 1997 04 23 04 00 101 2.5 -9 667.70 -68.4 -65.6 -68.5 53 0 SPO 1997 04 23 04 01 98 2.4 -9 667.60 -68.2 -65.6 -68.4 53 -99 SPO 1997 04 23 04 02 99 2.4 -9 667.60 -68.1 -65.6 -68.4 53 -99 SPO 1997 04 23 04 03 99 2.5 -9 667.60 -68.1 -65.4 -68.3 54 -99 SPO 1997 04 23 04 04 99 2.5 -9 667.60 -68.3 -65.4 -68.3 56 -99 SPO 1997 04 23 04 05 99 2.6 -9 667.60 -68.4 -65.3 -68.4 57 -99 SPO 1997 04 23 04 06 97 2.7 -9 667.50 -68.4 -65.2 -68.3 56 -99 SPO 1997 04 23 04 07 97 2.8 -9 667.50 -68.6 -65.0 -68.4 57 -99 SPO 1997 04 23 04 08 95 2.9 -9 667.50 -68.8 -64.9 -68.5 58 -99 SPO 1997 04 23 04 09 96 2.9 -9 667.50 -68.9 -64.9 -68.6 57 -99 SPO 1997 04 23 04 10 97 2.8 -9 667.50 -68.9 -65.0 -68.8 56 -99 SPO 1997 04 23 04 11 97 2.7 -9 667.50 -69.0 -65.0 -68.8 57 -99 SPO 1997 04 23 04 12 96 2.7 -9 667.50 -69.0 -65.0 -68.8 56 -99 SPO 1997 04 23 04 13 96 2.7 -9 667.50 -69.0 -65.0 -68.9 57 -99 SPO 1997 04 23 04 14 95 2.9 -9 667.50 -69.0 -65.1 -68.9 57 -99 SPO 1997 04 23 04 15 94 3.0 -9 667.50 -69.1 -65.0 -68.9 58 -99 SPO 1997 04 23 04 16 93 3.0 -9 667.50 -69.2 -65.0 -69.0 58 -99 SPO 1997 04 23 04 17 93 3.0 -9 667.50 -69.3 -65.0 -69.1 58 -99 SPO 1997 04 23 04 18 93 2.9 -9 667.50 -69.4 -65.0 -69.1 58 -99 SPO 1997 04 23 04 19 94 2.8 -9 667.50 -69.4 -65.0 -69.1 58 -99 SPO 1997 04 23 04 20 95 2.7 -9 667.50 -69.4 -65.0 -69.2 58 -99 SPO 1997 04 23 04 21 94 2.7 -9 667.50 -69.4 -65.2 -69.2 57 -99 SPO 1997 04 23 04 22 95 2.6 -9 667.50 -69.4 -65.1 -69.3 57 -99 SPO 1997 04 23 04 23 97 2.5 -9 667.50 -69.5 -65.0 -69.3 58 -99 SPO 1997 04 23 04 24 99 2.5 -9 667.50 -69.5 -65.0 -69.3 58 -99 SPO 1997 04 23 04 25 103 2.3 -9 667.60 -69.6 -65.0 -69.4 58 -99 SPO 1997 04 23 04 26 106 2.3 -9 667.60 -69.6 -65.2 -69.4 58 -99 SPO 1997 04 23 04 27 108 2.3 -9 667.60 -69.5 -65.2 -69.4 57 -99 SPO 1997 04 23 04 28 111 2.3 -9 667.60 -69.4 -65.2 -69.3 56 -99 SPO 1997 04 23 04 29 112 2.3 -9 667.60 -69.3 -65.2 -69.2 54 -99 SPO 1997 04 23 04 30 112 2.2 -9 667.60 -69.1 -65.4 -69.0 54 -99 SPO 1997 04 23 04 31 112 2.2 -9 667.60 -68.8 -65.4 -69.0 52 -99 SPO 1997 04 23 04 32 112 2.1 -9 667.60 -68.9 -65.6 -69.0 54 -99 SPO 1997 04 23 04 33 111 2.1 -9 667.60 -69.2 -65.6 -69.1 56 -99 SPO 1997 04 23 04 34 111 2.2 -9 667.60 -69.3 -65.5 -69.2 56 -99 SPO 1997 04 23 04 35 110 2.3 -9 667.50 -69.1 -65.4 -69.1 55 -99 SPO 1997 04 23 04 36 109 2.4 -9 667.60 -68.9 -65.3 -68.9 53 -99 SPO 1997 04 23 04 37 106 2.5 -9 667.50 -69.0 -65.2 -68.9 55 -99 SPO 1997 04 23 04 38 106 2.5 -9 667.50 -69.2 -65.3 -69.0 56 -99 SPO 1997 04 23 04 39 107 2.5 -9 667.60 -69.4 -65.2 -69.2 56 -99 SPO 1997 04 23 04 40 106 2.6 -9 667.60 -69.4 -65.3 -69.2 56 -99 SPO 1997 04 23 04 41 107 2.6 -9 667.50 -69.4 -65.3 -69.2 55 -99 SPO 1997 04 23 04 42 105 2.6 -9 667.50 -69.4 -65.3 -69.1 54 -99 SPO 1997 04 23 04 43 105 2.5 -9 667.50 -69.3 -65.4 -69.1 54 -99 SPO 1997 04 23 04 44 104 2.6 -9 667.50 -69.4 -65.5 -69.1 54 -99 SPO 1997 04 23 04 45 101 2.6 -9 667.50 -69.4 -65.4 -69.1 54 -99 SPO 1997 04 23 04 46 102 2.5 -9 667.50 -69.5 -65.4 -69.2 55 -99 SPO 1997 04 23 04 47 102 2.4 -9 667.50 -69.6 -65.4 -69.2 56 -99 SPO 1997 04 23 04 48 103 2.3 -9 667.40 -69.5 -65.4 -69.3 55 -99 SPO 1997 04 23 04 49 102 2.4 -9 667.50 -69.3 -65.4 -69.2 54 -99 SPO 1997 04 23 04 50 100 2.6 -9 667.40 -69.2 -65.3 -69.1 53 -99 SPO 1997 04 23 04 51 98 2.7 -9 667.40 -69.3 -65.2 -69.1 53 -99 SPO 1997 04 23 04 52 98 2.6 -9 667.40 -69.4 -65.2 -69.1 54 -99 SPO 1997 04 23 04 53 98 2.6 -9 667.40 -69.6 -65.2 -69.2 54 -99 SPO 1997 04 23 04 54 98 2.5 -9 667.40 -69.9 -65.3 -69.4 56 -99 SPO 1997 04 23 04 55 98 2.4 -9 667.40 -70.0 -65.4 -69.6 56 -99 SPO 1997 04 23 04 56 98 2.5 -9 667.50 -70.0 -65.4 -69.6 54 -99 SPO 1997 04 23 04 57 97 2.5 -9 667.50 -70.0 -65.4 -69.7 54 -99 SPO 1997 04 23 04 58 98 2.5 -9 667.40 -70.0 -65.5 -69.7 54 -99 SPO 1997 04 23 04 59 98 2.6 -9 667.40 -69.9 -65.5 -69.7 54 -99 SPO 1997 04 23 05 00 97 2.7 -9 667.40 -69.8 -65.5 -69.6 54 0 SPO 1997 04 23 05 01 95 2.7 -9 667.40 -69.7 -65.4 -69.6 54 -99 SPO 1997 04 23 05 02 95 2.7 -9 667.40 -69.8 -65.4 -69.6 54 -99 SPO 1997 04 23 05 03 92 2.6 -9 667.40 -70.0 -65.6 -69.7 57 -99 SPO 1997 04 23 05 04 92 2.6 -9 667.40 -70.0 -65.5 -69.8 56 -99 SPO 1997 04 23 05 05 93 2.6 -9 667.40 -69.9 -65.6 -69.8 54 -99 SPO 1997 04 23 05 06 96 2.5 -9 667.40 -69.9 -65.7 -69.8 54 -99 SPO 1997 04 23 05 07 99 2.4 -9 667.40 -69.8 -65.8 -69.8 53 -99 SPO 1997 04 23 05 08 100 2.4 -9 667.50 -69.7 -65.8 -69.8 53 -99 SPO 1997 04 23 05 09 99 2.4 -9 667.50 -69.6 -65.9 -69.7 53 -99 SPO 1997 04 23 05 10 100 2.5 -9 667.50 -69.6 -65.8 -69.7 53 -99 SPO 1997 04 23 05 11 100 2.5 -9 667.40 -69.6 -65.9 -69.7 54 -99 SPO 1997 04 23 05 12 100 2.5 -9 667.40 -69.6 -66.0 -69.7 54 -99 SPO 1997 04 23 05 13 100 2.5 -9 667.40 -69.6 -66.0 -69.7 54 -99 SPO 1997 04 23 05 14 104 2.3 -9 667.40 -69.7 -66.0 -69.7 54 -99 SPO 1997 04 23 05 15 105 2.3 -9 667.50 -69.6 -66.0 -69.7 54 -99 SPO 1997 04 23 05 16 106 2.3 -9 667.50 -69.4 -66.0 -69.6 52 -99 SPO 1997 04 23 05 17 108 2.3 -9 667.50 -69.4 -66.1 -69.5 52 -99 SPO 1997 04 23 05 18 109 2.3 -9 667.50 -69.3 -66.2 -69.5 52 -99 SPO 1997 04 23 05 19 111 2.3 -9 667.50 -69.3 -66.2 -69.4 52 -99 SPO 1997 04 23 05 20 112 2.1 -9 667.50 -69.2 -66.3 -69.4 52 -99 SPO 1997 04 23 05 21 117 1.9 -9 667.50 -69.0 -66.3 -69.2 51 -99 SPO 1997 04 23 05 22 120 1.9 -9 667.60 -68.8 -66.2 -69.1 51 -99 SPO 1997 04 23 05 23 120 1.9 -9 667.60 -68.7 -66.3 -69.1 51 -99 SPO 1997 04 23 05 24 120 1.9 -9 667.60 -68.9 -66.3 -69.2 53 -99 SPO 1997 04 23 05 25 120 1.9 -9 667.60 -69.0 -66.3 -69.3 53 -99 SPO 1997 04 23 05 26 120 1.9 -9 667.60 -69.2 -66.4 -69.4 55 -99 SPO 1997 04 23 05 27 120 2.0 -9 667.60 -69.0 -66.4 -69.3 53 -99 SPO 1997 04 23 05 28 120 2.0 -9 667.60 -68.8 -66.4 -69.2 52 -99 SPO 1997 04 23 05 29 120 2.0 -9 667.60 -68.7 -66.4 -69.1 52 -99 SPO 1997 04 23 05 30 120 1.9 -9 667.60 -68.6 -66.4 -69.0 52 -99 SPO 1997 04 23 05 31 120 2.0 -9 667.60 -68.5 -66.4 -69.0 52 -99 SPO 1997 04 23 05 32 120 2.1 -9 667.60 -68.4 -66.4 -68.9 53 -99 SPO 1997 04 23 05 33 120 2.1 -9 667.60 -68.5 -66.3 -68.9 54 -99 SPO 1997 04 23 05 34 120 2.2 -9 667.60 -68.5 -66.3 -68.9 55 -99 SPO 1997 04 23 05 35 120 2.3 -9 667.60 -68.5 -66.3 -68.9 55 -99 SPO 1997 04 23 05 36 120 2.4 -9 667.60 -68.4 -66.3 -68.8 54 -99 SPO 1997 04 23 05 37 120 2.4 -9 667.60 -68.4 -66.3 -68.8 54 -99 SPO 1997 04 23 05 38 121 2.4 -9 667.60 -68.3 -66.3 -68.8 53 -99 SPO 1997 04 23 05 39 120 2.4 -9 667.60 -68.3 -66.3 -68.7 54 -99 SPO 1997 04 23 05 40 120 2.3 -9 667.60 -68.4 -66.4 -68.8 55 -99 SPO 1997 04 23 05 41 121 2.3 -9 667.60 -68.6 -66.4 -68.8 56 -99 SPO 1997 04 23 05 42 121 2.3 -9 667.60 -68.5 -66.4 -68.8 55 -99 SPO 1997 04 23 05 43 121 2.3 -9 667.60 -68.6 -66.4 -68.8 57 -99 SPO 1997 04 23 05 44 119 2.2 -9 667.60 -68.9 -66.2 -69.0 59 -99 SPO 1997 04 23 05 45 117 2.3 -9 667.60 -69.2 -66.0 -69.1 61 -99 SPO 1997 04 23 05 46 117 2.2 -9 667.50 -69.4 -66.0 -69.2 61 -99 SPO 1997 04 23 05 47 114 2.2 -9 667.50 -69.5 -66.0 -69.3 60 -99 SPO 1997 04 23 05 48 110 2.3 -9 667.50 -69.6 -66.0 -69.4 59 -99 SPO 1997 04 23 05 49 110 2.3 -9 667.50 -69.8 -66.0 -69.5 59 -99 SPO 1997 04 23 05 50 111 2.2 -9 667.50 -69.7 -66.1 -69.5 57 -99 SPO 1997 04 23 05 51 111 2.3 -9 667.50 -69.7 -66.0 -69.5 56 -99 SPO 1997 04 23 05 52 111 2.2 -9 667.50 -69.7 -66.0 -69.5 55 -99 SPO 1997 04 23 05 53 113 2.2 -9 667.50 -69.7 -66.0 -69.4 55 -99 SPO 1997 04 23 05 54 117 2.1 -9 667.60 -69.6 -66.1 -69.4 55 -99 SPO 1997 04 23 05 55 115 2.2 -9 667.60 -69.4 -66.1 -69.4 54 -99 SPO 1997 04 23 05 56 115 2.2 -9 667.50 -69.4 -66.0 -69.4 54 -99 SPO 1997 04 23 05 57 115 2.3 -9 667.50 -69.5 -66.0 -69.4 56 -99 SPO 1997 04 23 05 58 115 2.3 -9 667.50 -69.4 -65.9 -69.3 55 -99 SPO 1997 04 23 05 59 114 2.3 -9 667.50 -69.3 -65.9 -69.3 54 -99 SPO 1997 04 23 06 00 112 2.3 -9 667.50 -69.3 -65.8 -69.2 54 0 SPO 1997 04 23 06 01 110 2.4 -9 667.50 -69.3 -65.9 -69.2 54 -99 SPO 1997 04 23 06 02 110 2.2 -9 667.50 -69.3 -66.0 -69.2 54 -99 SPO 1997 04 23 06 03 111 2.1 -9 667.60 -69.3 -66.1 -69.2 54 -99 SPO 1997 04 23 06 04 113 2.1 -9 667.60 -69.2 -66.2 -69.2 53 -99 SPO 1997 04 23 06 05 115 2.2 -9 667.60 -69.0 -66.3 -69.2 52 -99 SPO 1997 04 23 06 06 116 2.2 -9 667.50 -68.9 -66.3 -69.1 52 -99 SPO 1997 04 23 06 07 116 2.2 -9 667.50 -68.9 -66.3 -69.1 54 -99 SPO 1997 04 23 06 08 115 2.2 -9 667.50 -68.9 -66.3 -69.1 55 -99 SPO 1997 04 23 06 09 112 2.2 -9 667.50 -69.0 -66.2 -69.1 55 -99 SPO 1997 04 23 06 10 112 2.1 -9 667.60 -69.1 -66.2 -69.1 55 -99 SPO 1997 04 23 06 11 115 1.9 -9 667.60 -69.0 -66.4 -69.2 54 -99 SPO 1997 04 23 06 12 117 1.9 -9 667.60 -69.0 -66.6 -69.2 54 -99 SPO 1997 04 23 06 13 121 1.9 -9 667.60 -69.4 -66.8 -69.4 56 -99 SPO 1997 04 23 06 14 121 1.9 -9 667.60 -69.2 -66.9 -69.2 54 -99 SPO 1997 04 23 06 15 121 1.8 -9 667.60 -68.9 -67.0 -69.2 52 -99 SPO 1997 04 23 06 16 121 1.9 -9 667.60 -68.8 -67.1 -69.1 52 -99 SPO 1997 04 23 06 17 125 1.9 -9 667.60 -68.9 -67.1 -69.1 54 -99 SPO 1997 04 23 06 18 125 2.0 -9 667.60 -69.0 -67.0 -69.2 55 -99 SPO 1997 04 23 06 19 124 2.0 -9 667.60 -69.0 -66.9 -69.2 56 -99 SPO 1997 04 23 06 20 123 2.0 -9 667.50 -68.9 -66.9 -69.2 55 -99 SPO 1997 04 23 06 21 118 2.0 -9 667.50 -68.9 -66.9 -69.2 56 -99 SPO 1997 04 23 06 22 114 2.2 -9 667.50 -69.0 -66.8 -69.2 56 -99 SPO 1997 04 23 06 23 112 2.3 -9 667.50 -69.0 -66.6 -69.2 56 -99 SPO 1997 04 23 06 24 112 2.4 -9 667.50 -69.0 -66.5 -69.2 55 -99 SPO 1997 04 23 06 25 113 2.4 -9 667.50 -69.0 -66.5 -69.2 55 -99 SPO 1997 04 23 06 26 112 2.4 -9 667.50 -69.0 -66.4 -69.2 55 -99 SPO 1997 04 23 06 27 112 2.3 -9 667.50 -68.9 -66.6 -69.2 54 -99 SPO 1997 04 23 06 28 112 2.2 -9 667.50 -69.0 -66.6 -69.2 55 -99 SPO 1997 04 23 06 29 113 2.1 -9 667.50 -69.1 -66.7 -69.2 56 -99 SPO 1997 04 23 06 30 113 2.1 -9 667.50 -69.0 -66.8 -69.1 55 -99 SPO 1997 04 23 06 31 113 2.1 -9 667.50 -69.0 -66.8 -69.1 55 -99 SPO 1997 04 23 06 32 113 2.0 -9 667.40 -69.0 -67.0 -69.2 55 -99 SPO 1997 04 23 06 33 112 2.0 -9 667.50 -69.0 -67.0 -69.2 55 -99 SPO 1997 04 23 06 34 111 2.1 -9 667.50 -69.0 -67.0 -69.1 55 -99 SPO 1997 04 23 06 35 110 2.2 -9 667.50 -68.9 -67.0 -69.1 55 -99 SPO 1997 04 23 06 36 110 2.2 -9 667.50 -68.9 -67.1 -69.1 55 -99 SPO 1997 04 23 06 37 112 2.1 -9 667.50 -68.9 -67.0 -69.1 55 -99 SPO 1997 04 23 06 38 113 1.9 -9 667.50 -69.0 -67.0 -69.1 55 -99 SPO 1997 04 23 06 39 120 1.9 -9 667.60 -68.9 -67.2 -69.1 55 -99 SPO 1997 04 23 06 40 121 1.8 -9 667.60 -69.0 -67.4 -69.2 55 -99 SPO 1997 04 23 06 41 123 1.8 -9 667.60 -69.3 -67.5 -69.3 58 -99 SPO 1997 04 23 06 42 125 1.9 -9 667.60 -69.4 -67.5 -69.4 58 -99 SPO 1997 04 23 06 43 125 1.9 -9 667.60 -69.4 -67.4 -69.4 57 -99 SPO 1997 04 23 06 44 125 1.9 -9 667.60 -69.5 -67.4 -69.5 58 -99 SPO 1997 04 23 06 45 125 1.8 -9 667.60 -69.6 -67.5 -69.5 57 -99 SPO 1997 04 23 06 46 125 1.8 -9 667.60 -69.6 -67.6 -69.6 57 -99 SPO 1997 04 23 06 47 125 1.8 -9 667.60 -69.5 -67.6 -69.5 55 -99 SPO 1997 04 23 06 48 124 1.8 -9 667.60 -69.4 -67.5 -69.5 54 -99 SPO 1997 04 23 06 49 124 1.8 -9 667.50 -69.3 -67.5 -69.4 54 -99 SPO 1997 04 23 06 50 124 1.9 -9 667.50 -69.3 -67.5 -69.4 54 -99 SPO 1997 04 23 06 51 125 1.9 -9 667.50 -69.3 -67.5 -69.5 55 -99 SPO 1997 04 23 06 52 124 2.0 -9 667.50 -69.4 -67.4 -69.5 57 -99 SPO 1997 04 23 06 53 125 2.0 -9 667.50 -69.5 -67.4 -69.6 58 -99 SPO 1997 04 23 06 54 125 1.9 -9 667.50 -69.5 -67.5 -69.6 58 -99 SPO 1997 04 23 06 55 125 1.8 -9 667.50 -69.6 -67.6 -69.6 58 -99 SPO 1997 04 23 06 56 125 1.8 -9 667.50 -69.7 -67.6 -69.7 58 -99 SPO 1997 04 23 06 57 125 1.9 -9 667.50 -69.7 -67.5 -69.8 57 -99 SPO 1997 04 23 06 58 122 1.9 -9 667.50 -69.8 -67.4 -69.8 57 -99 SPO 1997 04 23 06 59 120 1.9 -9 667.50 -69.8 -67.3 -69.9 57 -99 SPO 1997 04 23 07 00 120 2.0 -9 667.50 -70.0 -67.4 -70.0 57 0 SPO 1997 04 23 07 01 121 2.1 -9 667.50 -70.0 -67.4 -70.0 56 -99 SPO 1997 04 23 07 02 124 2.2 -9 667.50 -70.0 -67.5 -70.0 56 -99 SPO 1997 04 23 07 03 125 2.2 -9 667.50 -69.9 -67.5 -70.0 57 -99 SPO 1997 04 23 07 04 124 2.2 -9 667.50 -69.8 -67.4 -69.9 56 -99 SPO 1997 04 23 07 05 121 2.1 -9 667.50 -70.0 -67.4 -70.0 58 -99 SPO 1997 04 23 07 06 117 2.1 -9 667.50 -70.2 -67.5 -70.1 59 -99 SPO 1997 04 23 07 07 115 2.2 -9 667.50 -70.4 -67.4 -70.2 61 -99 SPO 1997 04 23 07 08 115 2.3 -9 667.50 -70.4 -67.3 -70.2 59 -99 SPO 1997 04 23 07 09 115 2.3 -9 667.50 -70.4 -67.2 -70.2 57 -99 SPO 1997 04 23 07 10 117 2.3 -9 667.50 -70.3 -67.2 -70.2 56 -99 SPO 1997 04 23 07 11 116 2.4 -9 667.50 -70.4 -67.1 -70.2 56 -99 SPO 1997 04 23 07 12 116 2.4 -9 667.50 -70.5 -67.1 -70.3 56 -99 SPO 1997 04 23 07 13 116 2.5 -9 667.50 -70.6 -67.2 -70.4 56 -99 SPO 1997 04 23 07 14 116 2.4 -9 667.50 -70.7 -67.1 -70.4 57 -99 SPO 1997 04 23 07 15 115 2.4 -9 667.50 -70.7 -67.0 -70.5 56 -99 SPO 1997 04 23 07 16 113 2.4 -9 667.50 -70.7 -67.0 -70.5 56 -99 SPO 1997 04 23 07 17 111 2.4 -9 667.40 -70.6 -67.0 -70.4 55 -99 SPO 1997 04 23 07 18 108 2.5 -9 667.40 -70.6 -66.9 -70.4 55 -99 SPO 1997 04 23 07 19 106 2.5 -9 667.40 -70.5 -66.8 -70.4 54 -99 SPO 1997 04 23 07 20 105 2.5 -9 667.40 -70.5 -66.7 -70.4 54 -99 SPO 1997 04 23 07 21 105 2.5 -9 667.40 -70.6 -66.6 -70.4 54 -99 SPO 1997 04 23 07 22 105 2.5 -9 667.40 -70.5 -66.7 -70.5 53 -99 SPO 1997 04 23 07 23 106 2.6 -9 667.40 -70.5 -66.8 -70.5 53 -99 SPO 1997 04 23 07 24 108 2.6 -9 667.40 -70.5 -66.5 -70.5 53 -99 SPO 1997 04 23 07 25 108 2.6 -9 667.40 -70.4 -66.4 -70.4 52 -99 SPO 1997 04 23 07 26 109 2.6 -9 667.40 -70.4 -66.3 -70.4 52 -99 SPO 1997 04 23 07 27 111 2.5 -9 667.40 -70.6 -66.5 -70.5 54 -99 SPO 1997 04 23 07 28 113 2.5 -9 667.40 -70.6 -66.7 -70.6 54 -99 SPO 1997 04 23 07 29 113 2.5 -9 667.40 -70.7 -66.9 -70.7 54 -99 SPO 1997 04 23 07 30 113 2.4 -9 667.40 -70.7 -66.9 -70.7 54 -99 SPO 1997 04 23 07 31 113 2.3 -9 667.40 -70.8 -66.8 -70.7 54 -99 SPO 1997 04 23 07 32 112 2.3 -9 667.40 -70.8 -66.9 -70.8 54 -99 SPO 1997 04 23 07 33 112 2.3 -9 667.40 -70.9 -66.8 -70.8 54 -99 SPO 1997 04 23 07 34 113 2.3 -9 667.40 -70.9 -67.0 -70.8 53 -99 SPO 1997 04 23 07 35 113 2.2 -9 667.40 -70.9 -67.1 -70.8 53 -99 SPO 1997 04 23 07 36 113 2.3 -9 667.40 -70.8 -67.1 -70.8 53 -99 SPO 1997 04 23 07 37 114 2.2 -9 667.40 -70.7 -67.0 -70.8 53 -99 SPO 1997 04 23 07 38 120 2.3 -9 667.40 -70.6 -67.0 -70.7 53 -99 SPO 1997 04 23 07 39 121 2.3 -9 667.50 -70.4 -67.2 -70.6 52 -99 SPO 1997 04 23 07 40 122 2.2 -9 667.40 -70.3 -67.3 -70.6 52 -99 SPO 1997 04 23 07 41 122 2.3 -9 667.40 -70.3 -67.2 -70.5 54 -99 SPO 1997 04 23 07 42 122 2.2 -9 667.40 -70.3 -67.2 -70.6 53 -99 SPO 1997 04 23 07 43 122 2.3 -9 667.40 -70.4 -67.3 -70.6 54 -99 SPO 1997 04 23 07 44 119 2.2 -9 667.40 -70.5 -67.4 -70.6 54 -99 SPO 1997 04 23 07 45 116 2.3 -9 667.40 -70.6 -67.4 -70.7 54 -99 SPO 1997 04 23 07 46 112 2.4 -9 667.40 -70.8 -67.3 -70.7 55 -99 SPO 1997 04 23 07 47 112 2.4 -9 667.40 -70.9 -67.4 -70.8 54 -99 SPO 1997 04 23 07 48 113 2.3 -9 667.40 -71.1 -67.5 -71.0 55 -99 SPO 1997 04 23 07 49 112 2.4 -9 667.30 -71.2 -67.5 -71.0 56 -99 SPO 1997 04 23 07 50 112 2.5 -9 667.30 -71.3 -67.4 -71.0 56 -99 SPO 1997 04 23 07 51 110 2.5 -9 667.30 -71.3 -67.3 -71.1 55 -99 SPO 1997 04 23 07 52 109 2.6 -9 667.20 -71.3 -67.2 -71.1 55 -99 SPO 1997 04 23 07 53 108 2.7 -9 667.20 -71.3 -67.2 -71.2 54 -99 SPO 1997 04 23 07 54 106 2.7 -9 667.20 -71.4 -67.2 -71.2 54 -99 SPO 1997 04 23 07 55 105 2.6 -9 667.20 -71.5 -67.4 -71.2 55 -99 SPO 1997 04 23 07 56 105 2.8 -9 667.20 -71.4 -67.4 -71.3 53 -99 SPO 1997 04 23 07 57 106 2.8 -9 667.20 -71.4 -67.4 -71.3 53 -99 SPO 1997 04 23 07 58 106 2.8 -9 667.20 -71.4 -67.6 -71.3 53 -99 SPO 1997 04 23 07 59 106 2.7 -9 667.20 -71.4 -67.6 -71.3 53 -99 SPO 1997 04 23 08 00 105 2.7 -9 667.20 -71.4 -67.7 -71.3 53 0 SPO 1997 04 23 08 01 105 2.5 -9 667.20 -71.4 -67.7 -71.3 53 -99 SPO 1997 04 23 08 02 104 2.6 -9 667.20 -71.3 -67.6 -71.3 53 -99 SPO 1997 04 23 08 03 102 2.6 -9 667.20 -71.3 -67.6 -71.3 53 -99 SPO 1997 04 23 08 04 101 2.6 -9 667.20 -71.3 -67.6 -71.4 53 -99 SPO 1997 04 23 08 05 101 2.5 -9 667.20 -71.3 -67.7 -71.4 52 -99 SPO 1997 04 23 08 06 101 2.5 -9 667.20 -71.4 -67.7 -71.4 53 -99 SPO 1997 04 23 08 07 101 2.4 -9 667.20 -71.4 -67.7 -71.4 52 -99 SPO 1997 04 23 08 08 101 2.5 -9 667.20 -71.4 -67.6 -71.5 52 -99 SPO 1997 04 23 08 09 100 2.6 -9 667.10 -71.4 -67.4 -71.4 51 -99 SPO 1997 04 23 08 10 98 2.6 -9 667.10 -71.3 -67.4 -71.4 50 -99 SPO 1997 04 23 08 11 98 2.7 -9 667.10 -71.3 -67.4 -71.4 51 -99 SPO 1997 04 23 08 12 96 2.8 -9 667.10 -71.4 -67.4 -71.4 52 -99 SPO 1997 04 23 08 13 96 2.8 -9 667.10 -71.5 -67.3 -71.5 53 -99 SPO 1997 04 23 08 14 96 2.7 -9 667.10 -71.5 -67.3 -71.5 53 -99 SPO 1997 04 23 08 15 97 2.5 -9 667.10 -71.5 -67.3 -71.5 53 -99 SPO 1997 04 23 08 16 99 2.5 -9 667.20 -71.5 -67.4 -71.5 52 -99 SPO 1997 04 23 08 17 102 2.4 -9 667.20 -71.4 -67.4 -71.5 51 -99 SPO 1997 04 23 08 18 106 2.4 -9 667.20 -71.4 -67.5 -71.5 51 -99 SPO 1997 04 23 08 19 109 2.3 -9 667.20 -71.4 -67.5 -71.5 51 -99 SPO 1997 04 23 08 20 112 2.3 -9 667.20 -71.3 -67.4 -71.5 51 -99 SPO 1997 04 23 08 21 113 2.3 -9 667.20 -71.2 -67.3 -71.4 50 -99 SPO 1997 04 23 08 22 112 2.2 -9 667.20 -71.1 -67.3 -71.3 49 -99 SPO 1997 04 23 08 23 108 2.2 -9 667.20 -71.2 -67.3 -71.4 51 -99 SPO 1997 04 23 08 24 107 2.2 -9 667.20 -71.3 -67.4 -71.4 51 -99 SPO 1997 04 23 08 25 106 2.2 -9 667.20 -71.4 -67.5 -71.5 52 -99 SPO 1997 04 23 08 26 106 2.2 -9 667.20 -71.5 -67.5 -71.5 53 -99 SPO 1997 04 23 08 27 107 2.1 -9 667.20 -71.5 -67.5 -71.5 53 -99 SPO 1997 04 23 08 28 108 2.1 -9 667.10 -71.4 -67.5 -71.4 51 -99 SPO 1997 04 23 08 29 109 2.1 -9 667.10 -71.3 -67.5 -71.4 51 -99 SPO 1997 04 23 08 30 108 2.0 -9 667.10 -71.2 -67.5 -71.3 50 -99 SPO 1997 04 23 08 31 107 2.0 -9 667.10 -71.1 -67.5 -71.2 49 -99 SPO 1997 04 23 08 32 105 1.9 -9 667.20 -71.1 -67.6 -71.2 49 -99 SPO 1997 04 23 08 33 105 1.8 -9 667.20 -71.1 -67.5 -71.3 49 -99 SPO 1997 04 23 08 34 106 1.8 -9 667.20 -71.2 -67.5 -71.3 51 -99 SPO 1997 04 23 08 35 110 1.8 -9 667.20 -71.2 -67.5 -71.3 51 -99 SPO 1997 04 23 08 36 115 1.7 -9 667.30 -70.9 -67.6 -71.2 49 -99 SPO 1997 04 23 08 37 121 1.7 -9 667.30 -70.6 -67.8 -71.1 49 -99 SPO 1997 04 23 08 38 122 1.8 -9 667.20 -70.6 -67.8 -71.0 49 -99 SPO 1997 04 23 08 39 121 1.8 -9 667.20 -70.6 -67.8 -71.0 49 -99 SPO 1997 04 23 08 40 121 1.8 -9 667.20 -70.3 -67.8 -70.8 48 -99 SPO 1997 04 23 08 41 121 1.7 -9 667.30 -70.1 -68.0 -70.7 48 -99 SPO 1997 04 23 08 42 121 1.7 -9 667.30 -70.2 -68.0 -70.7 49 -99 SPO 1997 04 23 08 43 118 1.7 -9 667.30 -70.0 -68.0 -70.6 49 -99 SPO 1997 04 23 08 44 115 1.8 -9 667.20 -70.0 -67.9 -70.5 49 -99 SPO 1997 04 23 08 45 115 1.9 -9 667.20 -70.1 -67.8 -70.6 51 -99 SPO 1997 04 23 08 46 111 2.0 -9 667.20 -70.2 -67.7 -70.6 52 -99 SPO 1997 04 23 08 47 107 2.1 -9 667.10 -70.3 -67.6 -70.7 53 -99 SPO 1997 04 23 08 48 103 2.3 -9 667.10 -70.4 -67.5 -70.7 54 -99 SPO 1997 04 23 08 49 103 2.3 -9 667.10 -70.4 -67.4 -70.7 54 -99 SPO 1997 04 23 08 50 103 2.4 -9 667.10 -70.5 -67.4 -70.7 54 -99 SPO 1997 04 23 08 51 103 2.5 -9 667.10 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 08 52 102 2.5 -9 667.10 -70.7 -67.2 -70.8 54 -99 SPO 1997 04 23 08 53 102 2.6 -9 667.10 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 08 54 100 2.6 -9 667.10 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 08 55 97 2.7 -9 667.10 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 08 56 96 2.8 -9 667.10 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 08 57 97 2.7 -9 667.00 -70.5 -67.1 -70.8 53 -99 SPO 1997 04 23 08 58 99 2.7 -9 667.00 -70.5 -67.1 -70.8 54 -99 SPO 1997 04 23 08 59 100 2.6 -9 667.10 -70.5 -67.1 -70.8 54 -99 SPO 1997 04 23 09 00 103 2.5 -9 667.10 -70.6 -67.2 -70.8 54 0 SPO 1997 04 23 09 01 104 2.4 -9 667.10 -70.6 -67.2 -70.8 54 -99 SPO 1997 04 23 09 02 105 2.4 -9 667.10 -70.6 -67.3 -70.8 54 -99 SPO 1997 04 23 09 03 105 2.4 -9 667.10 -70.5 -67.4 -70.8 54 -99 SPO 1997 04 23 09 04 106 2.4 -9 667.10 -70.6 -67.4 -70.8 54 -99 SPO 1997 04 23 09 05 108 2.5 -9 667.10 -70.6 -67.4 -70.8 53 -99 SPO 1997 04 23 09 06 108 2.5 -9 667.10 -70.6 -67.5 -70.8 53 -99 SPO 1997 04 23 09 07 108 2.4 -9 667.10 -70.8 -67.5 -70.8 55 -99 SPO 1997 04 23 09 08 108 2.2 -9 667.10 -70.8 -67.5 -70.9 55 -99 SPO 1997 04 23 09 09 107 2.1 -9 667.10 -70.9 -67.6 -70.9 56 -99 SPO 1997 04 23 09 10 107 2.0 -9 667.10 -70.9 -67.7 -71.0 56 -99 SPO 1997 04 23 09 11 108 2.1 -9 667.10 -70.9 -67.6 -71.0 56 -99 SPO 1997 04 23 09 12 108 2.1 -9 667.10 -70.9 -67.7 -71.0 56 -99 SPO 1997 04 23 09 13 108 2.2 -9 667.10 -70.9 -67.7 -71.0 55 -99 SPO 1997 04 23 09 14 107 2.2 -9 667.00 -71.0 -67.6 -71.0 54 -99 SPO 1997 04 23 09 15 107 2.3 -9 667.00 -71.0 -67.7 -71.0 54 -99 SPO 1997 04 23 09 16 106 2.2 -9 667.10 -71.0 -67.7 -71.1 53 -99 SPO 1997 04 23 09 17 105 2.1 -9 667.10 -71.1 -67.7 -71.1 53 -99 SPO 1997 04 23 09 18 105 2.1 -9 667.10 -71.1 -67.6 -71.1 52 -99 SPO 1997 04 23 09 19 105 2.0 -9 667.10 -71.0 -67.6 -71.1 52 -99 SPO 1997 04 23 09 20 105 2.0 -9 667.10 -71.0 -67.6 -71.0 53 -99 SPO 1997 04 23 09 21 105 2.0 -9 667.10 -70.9 -67.6 -71.0 53 -99 SPO 1997 04 23 09 22 105 2.0 -9 667.10 -70.8 -67.6 -70.9 53 -99 SPO 1997 04 23 09 23 104 2.1 -9 667.10 -70.7 -67.6 -70.8 53 -99 SPO 1997 04 23 09 24 100 2.2 -9 667.10 -70.7 -67.6 -70.8 53 -99 SPO 1997 04 23 09 25 99 2.1 -9 667.00 -70.6 -67.5 -70.8 52 -99 SPO 1997 04 23 09 26 98 2.0 -9 667.00 -70.6 -67.5 -70.8 52 -99 SPO 1997 04 23 09 27 97 2.0 -9 667.00 -70.6 -67.6 -70.7 52 -99 SPO 1997 04 23 09 28 97 2.0 -9 667.00 -70.4 -67.6 -70.7 51 -99 SPO 1997 04 23 09 29 99 2.0 -9 667.00 -70.4 -67.6 -70.7 51 -99 SPO 1997 04 23 09 30 101 2.1 -9 667.00 -70.4 -67.6 -70.6 51 -99 SPO 1997 04 23 09 31 102 2.2 -9 666.90 -70.2 -67.5 -70.4 51 -99 SPO 1997 04 23 09 32 101 2.3 -9 666.90 -70.0 -67.4 -70.4 50 -99 SPO 1997 04 23 09 33 102 2.4 -9 666.90 -70.2 -67.5 -70.4 52 -99 SPO 1997 04 23 09 34 102 2.3 -9 666.90 -70.4 -67.4 -70.4 54 -99 SPO 1997 04 23 09 35 102 2.5 -9 666.90 -70.4 -67.4 -70.5 54 -99 SPO 1997 04 23 09 36 102 2.5 -9 666.90 -70.6 -67.3 -70.6 54 -99 SPO 1997 04 23 09 37 102 2.6 -9 666.80 -70.6 -67.2 -70.7 54 -99 SPO 1997 04 23 09 38 101 2.8 -9 666.80 -70.7 -67.1 -70.7 54 -99 SPO 1997 04 23 09 39 98 2.9 -9 666.80 -70.8 -67.1 -70.8 55 -99 SPO 1997 04 23 09 40 97 2.9 -9 666.80 -70.8 -67.1 -70.8 54 -99 SPO 1997 04 23 09 41 97 2.9 -9 666.70 -70.9 -67.1 -70.9 55 -99 SPO 1997 04 23 09 42 98 2.8 -9 666.70 -70.9 -67.1 -70.9 54 -99 SPO 1997 04 23 09 43 99 2.8 -9 666.80 -70.9 -67.2 -70.9 54 -99 SPO 1997 04 23 09 44 99 2.6 -9 666.80 -70.9 -67.3 -70.9 54 -99 SPO 1997 04 23 09 45 100 2.5 -9 666.80 -70.9 -67.4 -70.9 54 -99 SPO 1997 04 23 09 46 100 2.5 -9 666.80 -70.9 -67.4 -70.9 54 -99 SPO 1997 04 23 09 47 98 2.4 -9 666.80 -70.9 -67.6 -71.0 54 -99 SPO 1997 04 23 09 48 98 2.5 -9 666.80 -70.9 -67.6 -71.0 54 -99 SPO 1997 04 23 09 49 98 2.5 -9 666.80 -70.9 -67.6 -71.0 54 -99 SPO 1997 04 23 09 50 98 2.5 -9 666.80 -71.0 -67.6 -71.0 55 -99 SPO 1997 04 23 09 51 98 2.5 -9 666.80 -71.0 -67.6 -71.1 55 -99 SPO 1997 04 23 09 52 97 2.6 -9 666.70 -71.1 -67.6 -71.1 55 -99 SPO 1997 04 23 09 53 97 2.7 -9 666.70 -71.1 -67.5 -71.2 55 -99 SPO 1997 04 23 09 54 97 2.7 -9 666.70 -71.2 -67.4 -71.2 56 -99 SPO 1997 04 23 09 55 98 2.6 -9 666.70 -71.3 -67.4 -71.2 56 -99 SPO 1997 04 23 09 56 98 2.7 -9 666.70 -71.3 -67.4 -71.3 56 -99 SPO 1997 04 23 09 57 98 2.8 -9 666.60 -71.3 -67.2 -71.3 55 -99 SPO 1997 04 23 09 58 98 2.9 -9 666.60 -71.4 -67.2 -71.3 55 -99 SPO 1997 04 23 09 59 100 2.9 -9 666.60 -71.4 -67.2 -71.3 53 -99 SPO 1997 04 23 10 00 103 2.8 -9 666.60 -71.4 -67.2 -71.4 53 0 SPO 1997 04 23 10 01 102 2.8 -9 666.60 -71.3 -67.2 -71.3 52 -99 SPO 1997 04 23 10 02 102 2.8 -9 666.60 -71.3 -67.2 -71.3 53 -99 SPO 1997 04 23 10 03 104 2.8 -9 666.70 -71.2 -67.2 -71.3 53 -99 SPO 1997 04 23 10 04 105 2.8 -9 666.60 -71.2 -67.3 -71.3 53 -99 SPO 1997 04 23 10 05 107 2.8 -9 666.60 -71.1 -67.4 -71.3 53 -99 SPO 1997 04 23 10 06 107 2.7 -9 666.60 -71.0 -67.4 -71.2 53 -99 SPO 1997 04 23 10 07 108 2.8 -9 666.60 -71.0 -67.4 -71.2 53 -99 SPO 1997 04 23 10 08 107 2.8 -9 666.60 -70.9 -67.3 -71.1 53 -99 SPO 1997 04 23 10 09 107 2.7 -9 666.60 -70.9 -67.2 -71.1 53 -99 SPO 1997 04 23 10 10 105 2.7 -9 666.60 -70.9 -67.1 -71.2 53 -99 SPO 1997 04 23 10 11 105 2.7 -9 666.60 -70.9 -67.1 -71.1 53 -99 SPO 1997 04 23 10 12 105 2.7 -9 666.60 -70.9 -67.1 -71.1 53 -99 SPO 1997 04 23 10 13 106 2.7 -9 666.60 -70.9 -67.2 -71.1 52 -99 SPO 1997 04 23 10 14 106 2.8 -9 666.60 -70.9 -67.2 -71.1 52 -99 SPO 1997 04 23 10 15 106 2.8 -9 666.60 -70.9 -67.3 -71.1 53 -99 SPO 1997 04 23 10 16 107 2.7 -9 666.60 -70.8 -67.2 -71.0 53 -99 SPO 1997 04 23 10 17 109 2.7 -9 666.70 -70.8 -67.2 -71.0 53 -99 SPO 1997 04 23 10 18 113 2.7 -9 666.70 -70.6 -67.2 -70.9 53 -99 SPO 1997 04 23 10 19 113 2.7 -9 666.70 -70.6 -67.4 -70.9 53 -99 SPO 1997 04 23 10 20 114 2.7 -9 666.70 -70.6 -67.4 -70.9 54 -99 SPO 1997 04 23 10 21 114 2.8 -9 666.70 -70.6 -67.2 -70.9 54 -99 SPO 1997 04 23 10 22 113 2.8 -9 666.70 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 10 23 113 2.8 -9 666.60 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 10 24 112 2.8 -9 666.60 -70.5 -67.2 -70.8 52 -99 SPO 1997 04 23 10 25 112 2.8 -9 666.70 -70.4 -67.2 -70.8 51 -99 SPO 1997 04 23 10 26 112 2.8 -9 666.70 -70.4 -67.2 -70.7 51 -99 SPO 1997 04 23 10 27 111 2.8 -9 666.70 -70.4 -67.2 -70.7 51 -99 SPO 1997 04 23 10 28 111 2.8 -9 666.60 -70.4 -67.2 -70.7 52 -99 SPO 1997 04 23 10 29 108 2.8 -9 666.60 -70.4 -67.2 -70.7 53 -99 SPO 1997 04 23 10 30 105 2.8 -9 666.60 -70.4 -67.2 -70.7 53 -99 SPO 1997 04 23 10 31 101 2.9 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 32 100 2.8 -9 666.60 -70.4 -66.8 -70.7 54 -99 SPO 1997 04 23 10 33 98 2.8 -9 666.60 -70.4 -66.9 -70.7 54 -99 SPO 1997 04 23 10 34 97 2.8 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 35 98 2.7 -9 666.60 -70.4 -67.0 -70.7 53 -99 SPO 1997 04 23 10 36 99 2.7 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 37 100 2.8 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 38 100 2.7 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 39 100 2.6 -9 666.60 -70.4 -67.0 -70.7 54 -99 SPO 1997 04 23 10 40 100 2.4 -9 666.70 -70.5 -67.1 -70.7 54 -99 SPO 1997 04 23 10 41 99 2.2 -9 666.80 -70.5 -67.2 -70.7 54 -99 SPO 1997 04 23 10 42 98 2.2 -9 666.80 -70.5 -67.3 -70.7 54 -99 SPO 1997 04 23 10 43 98 2.3 -9 666.80 -70.5 -67.3 -70.7 55 -99 SPO 1997 04 23 10 44 98 2.4 -9 666.80 -70.6 -67.3 -70.8 55 -99 SPO 1997 04 23 10 45 100 2.4 -9 666.80 -70.6 -67.2 -70.8 55 -99 SPO 1997 04 23 10 46 104 2.3 -9 666.80 -70.6 -67.2 -70.8 54 -99 SPO 1997 04 23 10 47 105 2.2 -9 666.80 -70.7 -67.2 -70.8 55 -99 SPO 1997 04 23 10 48 105 2.1 -9 666.80 -70.6 -67.2 -70.8 54 -99 SPO 1997 04 23 10 49 105 1.9 -9 666.80 -70.6 -67.3 -70.8 54 -99 SPO 1997 04 23 10 50 106 1.8 -9 666.80 -70.5 -67.4 -70.8 54 -99 SPO 1997 04 23 10 51 107 1.6 -9 666.90 -70.4 -67.4 -70.7 53 -99 SPO 1997 04 23 10 52 113 1.5 -9 666.90 -70.2 -67.5 -70.6 53 -99 SPO 1997 04 23 10 53 114 1.6 -9 666.90 -70.2 -67.5 -70.5 53 -99 SPO 1997 04 23 10 54 114 1.6 -9 666.80 -70.3 -67.5 -70.5 54 -99 SPO 1997 04 23 10 55 113 1.8 -9 666.80 -70.0 -67.5 -70.4 52 -99 SPO 1997 04 23 10 56 111 1.8 -9 666.80 -69.9 -67.5 -70.3 52 -99 SPO 1997 04 23 10 57 112 1.9 -9 666.80 -70.0 -67.5 -70.4 53 -99 SPO 1997 04 23 10 58 114 1.9 -9 666.80 -70.0 -67.5 -70.4 54 -99 SPO 1997 04 23 10 59 114 2.0 -9 666.80 -70.0 -67.5 -70.4 54 -99 SPO 1997 04 23 11 00 114 2.2 -9 666.80 -70.3 -67.4 -70.6 56 0 SPO 1997 04 23 11 01 112 2.2 -9 666.80 -70.7 -67.4 -70.8 58 -99 SPO 1997 04 23 11 02 112 2.3 -9 666.80 -71.0 -67.4 -70.9 59 -99 SPO 1997 04 23 11 03 113 2.3 -9 666.80 -71.0 -67.4 -71.0 59 -99 SPO 1997 04 23 11 04 113 2.3 -9 666.80 -70.9 -67.3 -71.0 57 -99 SPO 1997 04 23 11 05 114 2.4 -9 666.80 -70.9 -67.2 -70.9 57 -99 SPO 1997 04 23 11 06 114 2.5 -9 666.80 -70.8 -67.2 -70.9 55 -99 SPO 1997 04 23 11 07 112 2.6 -9 666.80 -70.7 -67.2 -70.8 54 -99 SPO 1997 04 23 11 08 110 2.6 -9 666.80 -70.7 -67.2 -70.8 54 -99 SPO 1997 04 23 11 09 107 2.6 -9 666.80 -70.7 -67.2 -70.8 54 -99 SPO 1997 04 23 11 10 107 2.7 -9 666.80 -70.7 -67.2 -70.8 54 -99 SPO 1997 04 23 11 11 107 2.7 -9 666.70 -70.6 -67.2 -70.8 53 -99 SPO 1997 04 23 11 12 107 2.6 -9 666.70 -70.6 -67.2 -70.8 54 -99 SPO 1997 04 23 11 13 107 2.6 -9 666.70 -70.6 -67.1 -70.7 54 -99 SPO 1997 04 23 11 14 107 2.6 -9 666.70 -70.6 -67.0 -70.7 54 -99 SPO 1997 04 23 11 15 108 2.6 -9 666.70 -70.5 -67.0 -70.7 54 -99 SPO 1997 04 23 11 16 108 2.6 -9 666.70 -70.5 -67.1 -70.7 54 -99 SPO 1997 04 23 11 17 108 2.6 -9 666.70 -70.5 -67.2 -70.7 54 -99 SPO 1997 04 23 11 18 108 2.7 -9 666.70 -70.5 -67.2 -70.7 54 -99 SPO 1997 04 23 11 19 107 2.7 -9 666.70 -70.5 -67.2 -70.7 54 -99 SPO 1997 04 23 11 20 105 2.7 -9 666.70 -70.5 -67.1 -70.7 54 -99 SPO 1997 04 23 11 21 104 2.7 -9 666.70 -70.4 -67.1 -70.6 53 -99 SPO 1997 04 23 11 22 102 2.8 -9 666.70 -70.4 -67.2 -70.6 53 -99 SPO 1997 04 23 11 23 101 2.9 -9 666.70 -70.4 -67.2 -70.6 54 -99 SPO 1997 04 23 11 24 98 3.0 -9 666.70 -70.4 -67.2 -70.6 54 -99 SPO 1997 04 23 11 25 97 3.2 -9 666.70 -70.4 -67.1 -70.6 55 -99 SPO 1997 04 23 11 26 96 3.2 -9 666.60 -70.4 -67.1 -70.6 55 -99 SPO 1997 04 23 11 27 95 3.3 -9 666.60 -70.4 -67.0 -70.6 56 -99 SPO 1997 04 23 11 28 94 3.2 -9 666.60 -70.3 -67.1 -70.5 55 -99 SPO 1997 04 23 11 29 94 3.1 -9 666.60 -70.2 -67.1 -70.5 54 -99 SPO 1997 04 23 11 30 94 3.0 -9 666.60 -70.2 -67.0 -70.4 54 -99 SPO 1997 04 23 11 31 95 3.0 -9 666.60 -70.1 -67.0 -70.4 54 -99 SPO 1997 04 23 11 32 96 3.0 -9 666.60 -70.1 -67.0 -70.4 54 -99 SPO 1997 04 23 11 33 97 3.0 -9 666.60 -70.2 -67.1 -70.4 54 -99 SPO 1997 04 23 11 34 97 3.0 -9 666.60 -70.2 -67.1 -70.4 54 -99 SPO 1997 04 23 11 35 96 2.9 -9 666.60 -70.2 -67.2 -70.4 55 -99 SPO 1997 04 23 11 36 97 2.7 -9 666.60 -70.2 -67.4 -70.4 55 -99 SPO 1997 04 23 11 37 99 2.5 -9 666.70 -70.2 -67.4 -70.4 56 -99 SPO 1997 04 23 11 38 102 2.4 -9 666.70 -70.2 -67.4 -70.4 56 -99 SPO 1997 04 23 11 39 105 2.4 -9 666.70 -70.3 -67.4 -70.5 57 -99 SPO 1997 04 23 11 40 104 2.4 -9 666.70 -70.4 -67.5 -70.5 57 -99 SPO 1997 04 23 11 41 101 2.5 -9 666.70 -70.5 -67.5 -70.6 57 -99 SPO 1997 04 23 11 42 101 2.5 -9 666.70 -70.6 -67.4 -70.6 57 -99 SPO 1997 04 23 11 43 102 2.6 -9 666.60 -70.6 -67.4 -70.6 56 -99 SPO 1997 04 23 11 44 103 2.6 -9 666.60 -70.5 -67.2 -70.5 54 -99 SPO 1997 04 23 11 45 103 2.6 -9 666.60 -70.4 -67.2 -70.5 54 -99 SPO 1997 04 23 11 46 102 2.6 -9 666.60 -70.4 -67.2 -70.4 54 -99 SPO 1997 04 23 11 47 101 2.8 -9 666.60 -70.4 -67.2 -70.4 54 -99 SPO 1997 04 23 11 48 101 2.7 -9 666.60 -70.4 -67.1 -70.4 54 -99 SPO 1997 04 23 11 49 102 2.6 -9 666.60 -70.4 -67.2 -70.5 54 -99 SPO 1997 04 23 11 50 103 2.6 -9 666.60 -70.5 -67.2 -70.5 56 -99 SPO 1997 04 23 11 51 105 2.6 -9 666.60 -70.6 -67.2 -70.6 57 -99 SPO 1997 04 23 11 52 105 2.4 -9 666.70 -70.6 -67.2 -70.6 56 -99 SPO 1997 04 23 11 53 105 2.4 -9 666.70 -70.6 -67.2 -70.6 56 -99 SPO 1997 04 23 11 54 105 2.4 -9 666.70 -70.7 -67.3 -70.7 56 -99 SPO 1997 04 23 11 55 105 2.4 -9 666.70 -70.6 -67.3 -70.6 55 -99 SPO 1997 04 23 11 56 105 2.5 -9 666.70 -70.6 -67.2 -70.6 55 -99 SPO 1997 04 23 11 57 105 2.5 -9 666.70 -70.6 -67.2 -70.6 55 -99 SPO 1997 04 23 11 58 106 2.5 -9 666.70 -70.6 -67.2 -70.6 55 -99 SPO 1997 04 23 11 59 106 2.4 -9 666.60 -70.6 -67.2 -70.6 56 -99 SPO 1997 04 23 12 00 106 2.3 -9 666.60 -70.6 -67.3 -70.6 56 0 SPO 1997 04 23 12 01 106 2.2 -9 666.60 -70.7 -67.3 -70.6 56 -99 SPO 1997 04 23 12 02 106 2.2 -9 666.60 -70.6 -67.3 -70.6 54 -99 SPO 1997 04 23 12 03 108 2.2 -9 666.60 -70.6 -67.3 -70.6 54 -99 SPO 1997 04 23 12 04 109 2.2 -9 666.60 -70.6 -67.3 -70.5 54 -99 SPO 1997 04 23 12 05 109 2.2 -9 666.60 -70.4 -67.4 -70.4 52 -99 SPO 1997 04 23 12 06 108 2.2 -9 666.60 -70.3 -67.4 -70.3 51 -99 SPO 1997 04 23 12 07 108 2.0 -9 666.70 -70.2 -67.5 -70.2 51 -99 SPO 1997 04 23 12 08 109 1.9 -9 666.70 -69.9 -67.5 -70.0 50 -99 SPO 1997 04 23 12 09 110 1.9 -9 666.70 -69.6 -67.4 -69.9 49 -99 SPO 1997 04 23 12 10 108 2.0 -9 666.70 -69.5 -67.4 -69.9 51 -99 SPO 1997 04 23 12 11 108 2.0 -9 666.70 -69.5 -67.3 -69.9 52 -99 SPO 1997 04 23 12 12 106 2.0 -9 666.70 -69.6 -67.3 -69.9 54 -99 SPO 1997 04 23 12 13 105 2.0 -9 666.70 -69.5 -67.2 -69.8 54 -99 SPO 1997 04 23 12 14 106 2.0 -9 666.70 -69.4 -67.2 -69.8 53 -99 SPO 1997 04 23 12 15 107 2.0 -9 666.70 -69.4 -67.2 -69.8 53 -99 SPO 1997 04 23 12 16 110 1.9 -9 666.80 -69.3 -67.4 -69.7 52 -99 SPO 1997 04 23 12 17 113 1.8 -9 666.80 -69.2 -67.5 -69.6 52 -99 SPO 1997 04 23 12 18 113 1.9 -9 666.70 -69.1 -67.6 -69.6 52 -99 SPO 1997 04 23 12 19 113 1.9 -9 666.70 -69.1 -67.6 -69.6 52 -99 SPO 1997 04 23 12 20 114 1.9 -9 666.70 -69.2 -67.6 -69.6 54 -99 SPO 1997 04 23 12 21 117 2.0 -9 666.70 -69.2 -67.6 -69.6 54 -99 SPO 1997 04 23 12 22 120 2.0 -9 666.80 -69.2 -67.6 -69.5 55 -99 SPO 1997 04 23 12 23 119 1.8 -9 666.70 -69.2 -67.5 -69.5 55 -99 SPO 1997 04 23 12 24 119 1.9 -9 666.70 -69.1 -67.5 -69.4 55 -99 SPO 1997 04 23 12 25 119 1.9 -9 666.70 -69.0 -67.4 -69.4 55 -99 SPO 1997 04 23 12 26 120 2.1 -9 666.70 -69.0 -67.4 -69.3 55 -99 SPO 1997 04 23 12 27 120 2.0 -9 666.70 -69.0 -67.4 -69.3 55 -99 SPO 1997 04 23 12 28 120 2.1 -9 666.70 -69.0 -67.4 -69.3 55 -99 SPO 1997 04 23 12 29 120 2.2 -9 666.70 -69.0 -67.4 -69.3 55 -99 SPO 1997 04 23 12 30 119 2.2 -9 666.70 -69.2 -67.5 -69.4 57 -99 SPO 1997 04 23 12 31 119 2.3 -9 666.70 -69.4 -67.5 -69.4 58 -99 SPO 1997 04 23 12 32 115 2.3 -9 666.70 -69.6 -67.4 -69.6 58 -99 SPO 1997 04 23 12 33 115 2.2 -9 666.70 -69.8 -67.4 -69.6 59 -99 SPO 1997 04 23 12 34 119 2.0 -9 666.70 -69.9 -67.4 -69.7 60 -99 SPO 1997 04 23 12 35 118 2.0 -9 666.70 -69.8 -67.4 -69.7 58 -99 SPO 1997 04 23 12 36 120 2.1 -9 666.70 -69.7 -67.4 -69.7 57 -99 SPO 1997 04 23 12 37 119 2.2 -9 666.70 -69.6 -67.5 -69.6 57 -99 SPO 1997 04 23 12 38 118 2.3 -9 666.70 -69.6 -67.5 -69.6 56 -99 SPO 1997 04 23 12 39 114 2.5 -9 666.60 -69.8 -67.4 -69.7 57 -99 SPO 1997 04 23 12 40 114 2.5 -9 666.60 -70.0 -67.3 -69.8 57 -99 SPO 1997 04 23 12 41 114 2.5 -9 666.60 -70.0 -67.3 -69.9 56 -99 SPO 1997 04 23 12 42 115 2.5 -9 666.70 -70.1 -67.3 -69.9 56 -99 SPO 1997 04 23 12 43 115 2.6 -9 666.70 -70.2 -67.3 -70.0 57 -99 SPO 1997 04 23 12 44 115 2.7 -9 666.70 -70.2 -67.3 -70.0 57 -99 SPO 1997 04 23 12 45 113 2.7 -9 666.60 -70.3 -67.3 -70.1 57 -99 SPO 1997 04 23 12 46 112 2.7 -9 666.60 -70.4 -67.3 -70.1 58 -99 SPO 1997 04 23 12 47 111 2.6 -9 666.60 -70.4 -67.3 -70.2 57 -99 SPO 1997 04 23 12 48 111 2.6 -9 666.60 -70.5 -67.3 -70.3 58 -99 SPO 1997 04 23 12 49 111 2.6 -9 666.60 -70.6 -67.3 -70.4 57 -99 SPO 1997 04 23 12 50 108 2.5 -9 666.60 -70.6 -67.2 -70.4 57 -99 SPO 1997 04 23 12 51 107 2.4 -9 666.70 -70.7 -67.3 -70.4 57 -99 SPO 1997 04 23 12 52 105 2.4 -9 666.60 -70.7 -67.3 -70.5 57 -99 SPO 1997 04 23 12 53 105 2.4 -9 666.60 -70.7 -67.3 -70.5 56 -99 SPO 1997 04 23 12 54 104 2.5 -9 666.50 -70.7 -67.3 -70.5 56 -99 SPO 1997 04 23 12 55 103 2.6 -9 666.50 -70.7 -67.2 -70.5 56 -99 SPO 1997 04 23 12 56 101 2.6 -9 666.50 -70.7 -67.1 -70.6 56 -99 SPO 1997 04 23 12 57 98 2.7 -9 666.50 -70.8 -67.1 -70.6 57 -99 SPO 1997 04 23 12 58 96 2.7 -9 666.50 -70.8 -67.1 -70.7 57 -99 SPO 1997 04 23 12 59 97 2.7 -9 666.50 -70.8 -67.0 -70.7 56 -99 SPO 1997 04 23 13 00 97 2.6 -9 666.50 -70.8 -67.2 -70.7 56 0 SPO 1997 04 23 13 01 98 2.6 -9 666.50 -70.8 -67.2 -70.7 55 -99 SPO 1997 04 23 13 02 99 2.6 -9 666.50 -70.8 -67.2 -70.7 55 -99 SPO 1997 04 23 13 03 99 2.6 -9 666.50 -70.8 -67.1 -70.8 55 -99 SPO 1997 04 23 13 04 98 2.6 -9 666.50 -70.7 -67.1 -70.7 54 -99 SPO 1997 04 23 13 05 98 2.5 -9 666.50 -70.7 -67.1 -70.7 54 -99 SPO 1997 04 23 13 06 99 2.5 -9 666.50 -70.7 -67.1 -70.7 54 -99 SPO 1997 04 23 13 07 98 2.6 -9 666.50 -70.6 -67.1 -70.7 54 -99 SPO 1997 04 23 13 08 99 2.6 -9 666.50 -70.6 -67.1 -70.7 54 -99 SPO 1997 04 23 13 09 100 2.7 -9 666.50 -70.7 -67.1 -70.7 54 -99 SPO 1997 04 23 13 10 100 2.6 -9 666.50 -70.7 -67.1 -70.8 54 -99 SPO 1997 04 23 13 11 102 2.5 -9 666.50 -70.8 -67.0 -70.8 55 -99 SPO 1997 04 23 13 12 105 2.5 -9 666.50 -70.8 -67.1 -70.8 55 -99 SPO 1997 04 23 13 13 107 2.5 -9 666.50 -70.9 -67.2 -70.9 55 -99 SPO 1997 04 23 13 14 107 2.5 -9 666.50 -70.9 -67.1 -70.9 55 -99 SPO 1997 04 23 13 15 107 2.5 -9 666.50 -70.9 -67.0 -70.9 54 -99 SPO 1997 04 23 13 16 105 2.5 -9 666.50 -70.9 -66.9 -70.9 54 -99 SPO 1997 04 23 13 17 105 2.4 -9 666.50 -70.9 -66.8 -70.9 54 -99 SPO 1997 04 23 13 18 103 2.5 -9 666.50 -70.8 -66.8 -70.8 53 -99 SPO 1997 04 23 13 19 104 2.5 -9 666.50 -70.8 -66.6 -70.8 54 -99 SPO 1997 04 23 13 20 104 2.6 -9 666.40 -70.8 -66.6 -70.8 54 -99 SPO 1997 04 23 13 21 103 2.7 -9 666.40 -70.8 -66.6 -70.8 55 -99 SPO 1997 04 23 13 22 103 2.6 -9 666.50 -70.8 -66.6 -70.8 55 -99 SPO 1997 04 23 13 23 103 2.5 -9 666.40 -70.8 -66.7 -70.8 54 -99 SPO 1997 04 23 13 24 104 2.5 -9 666.40 -70.9 -66.7 -70.9 55 -99 SPO 1997 04 23 13 25 105 2.5 -9 666.40 -71.0 -66.8 -70.9 55 -99 SPO 1997 04 23 13 26 107 2.5 -9 666.40 -70.9 -66.8 -70.9 54 -99 SPO 1997 04 23 13 27 106 2.5 -9 666.50 -71.0 -66.8 -70.9 55 -99 SPO 1997 04 23 13 28 105 2.4 -9 666.50 -71.0 -66.9 -70.9 54 -99 SPO 1997 04 23 13 29 104 2.5 -9 666.50 -71.0 -66.9 -71.0 54 -99 SPO 1997 04 23 13 30 102 2.5 -9 666.50 -71.1 -66.8 -71.0 55 -99 SPO 1997 04 23 13 31 102 2.6 -9 666.40 -71.1 -66.8 -71.0 56 -99 SPO 1997 04 23 13 32 101 2.8 -9 666.40 -71.0 -66.7 -70.9 55 -99 SPO 1997 04 23 13 33 99 2.9 -9 666.40 -71.0 -66.7 -70.9 55 -99 SPO 1997 04 23 13 34 97 2.9 -9 666.40 -71.0 -66.7 -70.9 55 -99 SPO 1997 04 23 13 35 97 2.9 -9 666.40 -71.0 -66.7 -70.9 54 -99 SPO 1997 04 23 13 36 97 2.9 -9 666.40 -70.9 -66.6 -70.9 53 -99 SPO 1997 04 23 13 37 98 2.9 -9 666.40 -70.8 -66.7 -70.9 52 -99 SPO 1997 04 23 13 38 98 3.0 -9 666.40 -70.8 -66.7 -70.8 53 -99 SPO 1997 04 23 13 39 97 2.9 -9 666.30 -70.9 -66.8 -70.9 53 -99 SPO 1997 04 23 13 40 95 2.9 -9 666.30 -70.9 -66.9 -70.9 53 -99 SPO 1997 04 23 13 41 94 2.8 -9 666.40 -70.9 -67.0 -71.0 53 -99 SPO 1997 04 23 13 42 94 2.8 -9 666.40 -70.9 -67.1 -71.0 53 -99 SPO 1997 04 23 13 43 95 2.8 -9 666.40 -70.9 -67.1 -71.0 54 -99 SPO 1997 04 23 13 44 95 2.9 -9 666.30 -70.9 -67.0 -71.0 54 -99 SPO 1997 04 23 13 45 96 3.0 -9 666.30 -70.9 -67.1 -71.0 54 -99 SPO 1997 04 23 13 46 96 3.0 -9 666.30 -70.9 -67.1 -71.0 54 -99 SPO 1997 04 23 13 47 96 2.9 -9 666.30 -71.0 -67.0 -71.0 55 -99 SPO 1997 04 23 13 48 97 2.8 -9 666.30 -71.0 -67.0 -71.0 54 -99 SPO 1997 04 23 13 49 97 2.8 -9 666.30 -71.0 -67.1 -71.0 54 -99 SPO 1997 04 23 13 50 99 2.7 -9 666.30 -70.9 -67.2 -71.0 53 -99 SPO 1997 04 23 13 51 100 2.6 -9 666.40 -70.9 -67.2 -71.0 53 -99 SPO 1997 04 23 13 52 100 2.6 -9 666.30 -70.9 -67.2 -71.0 53 -99 SPO 1997 04 23 13 53 100 2.6 -9 666.30 -71.0 -67.3 -71.0 54 -99 SPO 1997 04 23 13 54 99 2.6 -9 666.30 -71.0 -67.4 -71.1 55 -99 SPO 1997 04 23 13 55 98 2.6 -9 666.30 -71.0 -67.4 -71.1 55 -99 SPO 1997 04 23 13 56 98 2.6 -9 666.30 -71.0 -67.3 -71.1 55 -99 SPO 1997 04 23 13 57 99 2.5 -9 666.30 -71.0 -67.3 -71.0 55 -99 SPO 1997 04 23 13 58 99 2.4 -9 666.30 -71.0 -67.3 -71.0 54 -99 SPO 1997 04 23 13 59 99 2.3 -9 666.40 -71.0 -67.4 -71.0 54 -99 SPO 1997 04 23 14 00 101 2.1 -9 666.40 -70.9 -67.4 -71.0 53 0 SPO 1997 04 23 14 01 104 2.1 -9 666.30 -70.8 -67.5 -71.0 52 -99 SPO 1997 04 23 14 02 107 2.2 -9 666.30 -70.6 -67.5 -70.8 51 -99 SPO 1997 04 23 14 03 110 2.2 -9 666.30 -70.4 -67.5 -70.7 50 -99 SPO 1997 04 23 14 04 112 2.2 -9 666.30 -70.1 -67.5 -70.5 49 -99 SPO 1997 04 23 14 05 113 2.2 -9 666.30 -69.9 -67.5 -70.4 50 -99 SPO 1997 04 23 14 06 113 2.1 -9 666.40 -69.6 -67.6 -70.2 50 -99 SPO 1997 04 23 14 07 114 2.2 -9 666.40 -69.5 -67.6 -70.1 51 -99 SPO 1997 04 23 14 08 115 2.3 -9 666.40 -69.5 -67.6 -70.1 52 -99 SPO 1997 04 23 14 09 115 2.4 -9 666.30 -69.5 -67.5 -70.0 53 -99 SPO 1997 04 23 14 10 113 2.5 -9 666.30 -69.4 -67.3 -70.0 52 -99 SPO 1997 04 23 14 11 113 2.6 -9 666.30 -69.6 -67.3 -70.0 54 -99 SPO 1997 04 23 14 12 112 2.6 -9 666.20 -69.9 -67.2 -70.2 55 -99 SPO 1997 04 23 14 13 110 2.5 -9 666.20 -70.2 -67.3 -70.3 57 -99 SPO 1997 04 23 14 14 109 2.6 -9 666.20 -70.3 -67.2 -70.3 57 -99 SPO 1997 04 23 14 15 109 2.6 -9 666.20 -70.3 -67.2 -70.3 55 -99 SPO 1997 04 23 14 16 109 2.7 -9 666.20 -70.3 -67.2 -70.3 55 -99 SPO 1997 04 23 14 17 108 2.8 -9 666.10 -70.4 -67.2 -70.3 56 -99 SPO 1997 04 23 14 18 106 2.8 -9 666.10 -70.5 -67.1 -70.4 57 -99 SPO 1997 04 23 14 19 106 2.8 -9 666.10 -70.6 -67.1 -70.5 57 -99 SPO 1997 04 23 14 20 107 2.7 -9 666.10 -70.6 -67.1 -70.5 57 -99 SPO 1997 04 23 14 21 108 2.6 -9 666.10 -70.6 -67.1 -70.6 56 -99 SPO 1997 04 23 14 22 111 2.5 -9 666.10 -70.6 -67.2 -70.6 55 -99 SPO 1997 04 23 14 23 111 2.5 -9 666.20 -70.4 -67.2 -70.5 54 -99 SPO 1997 04 23 14 24 111 2.5 -9 666.20 -70.3 -67.2 -70.4 54 -99 SPO 1997 04 23 14 25 109 2.5 -9 666.20 -70.3 -67.2 -70.4 54 -99 SPO 1997 04 23 14 26 110 2.5 -9 666.20 -70.2 -67.2 -70.3 54 -99 SPO 1997 04 23 14 27 111 2.5 -9 666.20 -70.1 -67.3 -70.2 54 -99 SPO 1997 04 23 14 28 112 2.4 -9 666.20 -70.0 -67.3 -70.1 54 -99 SPO 1997 04 23 14 29 111 2.5 -9 666.20 -70.0 -67.3 -70.1 54 -99 SPO 1997 04 23 14 30 108 2.6 -9 666.20 -70.1 -67.2 -70.1 55 -99 SPO 1997 04 23 14 31 107 2.6 -9 666.20 -70.0 -67.2 -70.1 54 -99 SPO 1997 04 23 14 32 106 2.6 -9 666.20 -70.1 -67.2 -70.1 56 -99 SPO 1997 04 23 14 33 105 2.5 -9 666.20 -70.2 -67.2 -70.2 56 -99 SPO 1997 04 23 14 34 105 2.5 -9 666.20 -70.2 -67.2 -70.2 56 -99 SPO 1997 04 23 14 35 105 2.6 -9 666.20 -70.2 -67.0 -70.2 55 -99 SPO 1997 04 23 14 36 107 2.6 -9 666.20 -70.2 -67.0 -70.2 54 -99 SPO 1997 04 23 14 37 109 2.7 -9 666.20 -70.0 -66.8 -70.1 54 -99 SPO 1997 04 23 14 38 111 2.7 -9 666.20 -70.0 -66.8 -70.0 54 -99 SPO 1997 04 23 14 39 110 2.8 -9 666.20 -69.9 -66.8 -70.0 54 -99 SPO 1997 04 23 14 40 109 2.8 -9 666.20 -69.9 -66.6 -70.0 55 -99 SPO 1997 04 23 14 41 108 2.7 -9 666.20 -69.9 -66.6 -70.0 55 -99 SPO 1997 04 23 14 42 108 2.6 -9 666.20 -70.0 -66.7 -70.0 56 -99 SPO 1997 04 23 14 43 109 2.6 -9 666.20 -69.9 -66.7 -70.0 55 -99 SPO 1997 04 23 14 44 110 2.7 -9 666.20 -69.9 -66.7 -70.0 54 -99 SPO 1997 04 23 14 45 109 2.8 -9 666.20 -69.9 -66.6 -70.0 55 -99 SPO 1997 04 23 14 46 107 2.7 -9 666.20 -70.0 -66.6 -70.0 56 -99 SPO 1997 04 23 14 47 105 2.8 -9 666.20 -70.0 -66.7 -70.0 56 -99 SPO 1997 04 23 14 48 105 2.7 -9 666.20 -69.9 -66.8 -70.0 55 -99 SPO 1997 04 23 14 49 106 2.8 -9 666.10 -69.9 -66.8 -70.0 55 -99 SPO 1997 04 23 14 50 105 2.8 -9 666.10 -69.9 -66.8 -70.0 56 -99 SPO 1997 04 23 14 51 102 3.0 -9 666.10 -70.0 -66.9 -70.0 57 -99 SPO 1997 04 23 14 52 100 2.9 -9 666.10 -69.9 -66.7 -70.0 56 -99 SPO 1997 04 23 14 53 100 2.9 -9 666.10 -69.9 -66.6 -70.0 56 -99 SPO 1997 04 23 14 54 102 3.1 -9 666.10 -70.0 -66.4 -70.1 57 -99 SPO 1997 04 23 14 55 105 3.1 -9 666.10 -70.0 -66.4 -70.1 57 -99 SPO 1997 04 23 14 56 108 3.1 -9 666.10 -70.0 -66.5 -70.1 56 -99 SPO 1997 04 23 14 57 108 3.2 -9 666.10 -70.0 -66.4 -70.1 56 -99 SPO 1997 04 23 14 58 107 3.1 -9 666.10 -69.9 -66.4 -70.0 54 -99 SPO 1997 04 23 14 59 106 3.1 -9 666.10 -69.8 -66.5 -70.0 54 -99 SPO 1997 04 23 15 00 109 3.0 -9 666.10 -69.8 -66.5 -70.0 54 0 SPO 1997 04 23 15 01 110 3.0 -9 666.10 -69.9 -66.6 -70.0 56 -99 SPO 1997 04 23 15 02 110 3.0 -9 666.10 -69.9 -66.7 -70.0 57 -99 SPO 1997 04 23 15 03 111 3.0 -9 666.10 -70.0 -66.6 -70.1 57 -99 SPO 1997 04 23 15 04 112 2.9 -9 666.10 -70.0 -66.6 -70.1 57 -99 SPO 1997 04 23 15 05 112 2.9 -9 666.10 -70.1 -66.7 -70.2 58 -99 SPO 1997 04 23 15 06 112 2.9 -9 666.10 -70.2 -66.6 -70.2 57 -99 SPO 1997 04 23 15 07 112 3.0 -9 666.10 -70.2 -66.7 -70.2 57 -99 SPO 1997 04 23 15 08 108 3.0 -9 666.10 -70.1 -66.6 -70.2 56 -99 SPO 1997 04 23 15 09 107 3.0 -9 666.10 -70.0 -66.6 -70.2 55 -99 SPO 1997 04 23 15 10 107 3.1 -9 666.10 -70.0 -66.6 -70.2 55 -99 SPO 1997 04 23 15 11 107 3.1 -9 666.00 -70.0 -66.6 -70.2 54 -99 SPO 1997 04 23 15 12 108 3.1 -9 666.10 -70.0 -66.6 -70.1 54 -99 SPO 1997 04 23 15 13 111 3.0 -9 666.10 -69.9 -66.8 -70.1 55 -99 SPO 1997 04 23 15 14 112 3.0 -9 666.10 -70.0 -66.9 -70.1 57 -99 SPO 1997 04 23 15 15 113 2.9 -9 666.10 -70.0 -66.9 -70.1 57 -99 SPO 1997 04 23 15 16 112 2.9 -9 666.20 -70.0 -66.9 -70.1 57 -99 SPO 1997 04 23 15 17 113 2.8 -9 666.20 -70.1 -66.9 -70.2 57 -99 SPO 1997 04 23 15 18 113 2.7 -9 666.20 -70.2 -66.9 -70.2 57 -99 SPO 1997 04 23 15 19 118 2.5 -9 666.20 -70.2 -67.0 -70.3 57 -99 SPO 1997 04 23 15 20 118 2.6 -9 666.20 -70.3 -67.0 -70.3 57 -99 SPO 1997 04 23 15 21 122 2.6 -9 666.30 -70.3 -67.1 -70.3 57 -99 SPO 1997 04 23 15 22 125 2.7 -9 666.20 -70.2 -67.1 -70.3 56 -99 SPO 1997 04 23 15 23 125 2.8 -9 666.30 -70.2 -67.1 -70.3 56 -99 SPO 1997 04 23 15 24 125 2.6 -9 666.30 -70.2 -67.0 -70.2 56 -99 SPO 1997 04 23 15 25 126 2.6 -9 666.30 -70.1 -67.0 -70.2 55 -99 SPO 1997 04 23 15 26 129 2.6 -9 666.30 -69.9 -67.2 -70.1 54 -99 SPO 1997 04 23 15 27 129 2.6 -9 666.30 -70.0 -67.2 -70.1 56 -99 SPO 1997 04 23 15 28 128 2.7 -9 666.30 -70.2 -67.2 -70.2 58 -99 SPO 1997 04 23 15 29 128 2.7 -9 666.30 -70.4 -67.1 -70.4 60 -99 SPO 1997 04 23 15 30 128 2.7 -9 666.30 -70.4 -67.1 -70.4 59 -99 SPO 1997 04 23 15 31 128 2.8 -9 666.30 -70.4 -67.1 -70.4 58 -99 SPO 1997 04 23 15 32 129 2.9 -9 666.30 -70.3 -67.0 -70.4 57 -99 SPO 1997 04 23 15 33 130 3.0 -9 666.30 -70.2 -67.0 -70.3 57 -99 SPO 1997 04 23 15 34 130 3.0 -9 666.30 -70.1 -67.0 -70.2 57 -99 SPO 1997 04 23 15 35 127 3.0 -9 666.20 -70.2 -66.9 -70.3 57 -99 SPO 1997 04 23 15 36 124 3.1 -9 666.20 -70.3 -66.9 -70.4 58 -99 SPO 1997 04 23 15 37 123 3.3 -9 666.20 -70.3 -66.8 -70.4 58 -99 SPO 1997 04 23 15 38 122 3.3 -9 666.10 -70.3 -66.6 -70.4 57 -99 SPO 1997 04 23 15 39 121 3.4 -9 666.10 -70.3 -66.6 -70.4 57 -99 SPO 1997 04 23 15 40 119 3.3 -9 666.10 -70.4 -66.5 -70.4 57 -99 SPO 1997 04 23 15 41 118 3.2 -9 666.10 -70.3 -66.4 -70.4 57 -99 SPO 1997 04 23 15 42 117 3.3 -9 666.10 -70.3 -66.2 -70.4 57 -99 SPO 1997 04 23 15 43 117 3.3 -9 666.10 -70.3 -66.2 -70.4 57 -99 SPO 1997 04 23 15 44 118 3.2 -9 666.10 -70.3 -66.3 -70.4 57 -99 SPO 1997 04 23 15 45 116 3.2 -9 666.10 -70.3 -66.4 -70.4 57 -99 SPO 1997 04 23 15 46 120 3.0 -9 666.10 -70.3 -66.3 -70.4 57 -99 SPO 1997 04 23 15 47 116 3.0 -9 666.10 -70.3 -66.3 -70.4 57 -99 SPO 1997 04 23 15 48 120 2.9 -9 666.10 -70.4 -66.3 -70.4 57 -99 SPO 1997 04 23 15 49 114 3.2 -9 666.10 -70.4 -66.2 -70.5 57 -99 SPO 1997 04 23 15 50 112 3.3 -9 666.10 -70.5 -66.1 -70.5 58 -99 SPO 1997 04 23 15 51 111 3.2 -9 666.00 -70.5 -66.0 -70.6 57 -99 SPO 1997 04 23 15 52 110 3.1 -9 666.00 -70.6 -66.1 -70.6 57 -99 SPO 1997 04 23 15 53 110 3.0 -9 666.00 -70.6 -66.4 -70.6 57 -99 SPO 1997 04 23 15 54 109 3.0 -9 666.00 -70.7 -66.5 -70.7 57 -99 SPO 1997 04 23 15 55 108 3.1 -9 666.00 -70.7 -66.5 -70.7 57 -99 SPO 1997 04 23 15 56 107 3.0 -9 666.00 -70.7 -66.5 -70.7 57 -99 SPO 1997 04 23 15 57 105 3.0 -9 666.00 -70.7 -66.6 -70.7 56 -99 SPO 1997 04 23 15 58 105 3.0 -9 666.00 -70.6 -66.7 -70.7 55 -99 SPO 1997 04 23 15 59 104 2.9 -9 666.00 -70.6 -66.7 -70.7 56 -99 SPO 1997 04 23 16 00 103 2.9 -9 666.00 -70.5 -66.7 -70.6 55 0 SPO 1997 04 23 16 01 102 2.8 -9 666.00 -70.4 -66.8 -70.6 55 -99 SPO 1997 04 23 16 02 104 2.6 -9 666.00 -70.3 -66.8 -70.5 54 -99 SPO 1997 04 23 16 03 107 2.6 -9 666.00 -70.3 -66.8 -70.5 55 -99 SPO 1997 04 23 16 04 108 2.6 -9 666.00 -70.3 -67.0 -70.4 55 -99 SPO 1997 04 23 16 05 109 2.6 -9 666.00 -70.4 -67.0 -70.5 55 -99 SPO 1997 04 23 16 06 112 2.6 -9 666.00 -70.5 -67.1 -70.6 55 -99 SPO 1997 04 23 16 07 111 2.6 -9 666.10 -70.6 -67.2 -70.6 56 -99 SPO 1997 04 23 16 08 111 2.5 -9 666.10 -70.6 -67.3 -70.6 55 -99 SPO 1997 04 23 16 09 111 2.5 -9 666.10 -70.6 -67.3 -70.6 54 -99 SPO 1997 04 23 16 10 112 2.5 -9 666.10 -70.6 -67.2 -70.6 54 -99 SPO 1997 04 23 16 11 113 2.5 -9 666.00 -70.6 -67.2 -70.7 55 -99 SPO 1997 04 23 16 12 112 2.6 -9 666.00 -70.7 -67.1 -70.7 56 -99 SPO 1997 04 23 16 13 111 2.6 -9 666.00 -70.6 -67.1 -70.6 55 -99 SPO 1997 04 23 16 14 110 2.6 -9 665.90 -70.6 -67.1 -70.6 55 -99 SPO 1997 04 23 16 15 106 2.6 -9 665.90 -70.6 -67.1 -70.6 56 -99 SPO 1997 04 23 16 16 104 2.7 -9 665.80 -70.6 -67.1 -70.6 55 -99 SPO 1997 04 23 16 17 103 2.7 -9 665.80 -70.6 -67.0 -70.7 54 -99 SPO 1997 04 23 16 18 103 2.7 -9 665.80 -70.6 -67.1 -70.7 54 -99 SPO 1997 04 23 16 19 103 2.7 -9 665.90 -70.5 -67.1 -70.7 53 -99 SPO 1997 04 23 16 20 103 2.7 -9 665.90 -70.5 -67.1 -70.6 53 -99 SPO 1997 04 23 16 21 102 2.6 -9 666.00 -70.4 -67.1 -70.6 53 -99 SPO 1997 04 23 16 22 103 2.6 -9 666.00 -70.5 -67.1 -70.6 54 -99 SPO 1997 04 23 16 23 106 2.5 -9 666.00 -70.6 -67.1 -70.6 56 -99 SPO 1997 04 23 16 24 108 2.5 -9 666.00 -70.6 -67.2 -70.7 56 -99 SPO 1997 04 23 16 25 109 2.5 -9 666.00 -70.6 -67.2 -70.7 56 -99 SPO 1997 04 23 16 26 109 2.5 -9 666.00 -70.6 -67.4 -70.7 56 -99 SPO 1997 04 23 16 27 108 2.6 -9 666.00 -70.7 -67.3 -70.8 57 -99 SPO 1997 04 23 16 28 107 2.7 -9 666.00 -70.7 -67.2 -70.8 56 -99 SPO 1997 04 23 16 29 105 2.8 -9 665.90 -70.7 -67.2 -70.7 56 -99 SPO 1997 04 23 16 30 104 2.8 -9 665.90 -70.6 -67.2 -70.7 54 -99 SPO 1997 04 23 16 31 102 2.8 -9 665.90 -70.5 -67.2 -70.6 54 -99 SPO 1997 04 23 16 32 102 2.7 -9 666.00 -70.4 -67.2 -70.6 53 -99 SPO 1997 04 23 16 33 102 2.6 -9 666.00 -70.4 -67.2 -70.6 53 -99 SPO 1997 04 23 16 34 102 2.6 -9 666.00 -70.3 -67.2 -70.5 52 -99 SPO 1997 04 23 16 35 101 2.6 -9 666.00 -70.3 -67.2 -70.5 54 -99 SPO 1997 04 23 16 36 100 2.6 -9 666.00 -70.3 -67.2 -70.5 54 -99 SPO 1997 04 23 16 37 100 2.9 -9 666.00 -70.4 -67.1 -70.5 56 -99 SPO 1997 04 23 16 38 99 3.0 -9 666.00 -70.4 -67.0 -70.5 56 -99 SPO 1997 04 23 16 39 98 3.0 -9 666.00 -70.4 -66.8 -70.5 55 -99 SPO 1997 04 23 16 40 97 2.9 -9 666.00 -70.4 -66.8 -70.5 55 -99 SPO 1997 04 23 16 41 97 2.9 -9 666.00 -70.3 -66.8 -70.5 54 -99 SPO 1997 04 23 16 42 95 2.9 -9 666.00 -70.2 -66.8 -70.5 54 -99 SPO 1997 04 23 16 43 95 2.9 -9 666.00 -70.2 -67.0 -70.4 54 -99 SPO 1997 04 23 16 44 94 3.0 -9 666.00 -70.1 -67.0 -70.4 53 -99 SPO 1997 04 23 16 45 93 3.0 -9 666.00 -70.1 -66.9 -70.4 54 -99 SPO 1997 04 23 16 46 92 3.2 -9 666.00 -70.0 -66.8 -70.4 54 -99 SPO 1997 04 23 16 47 90 3.2 -9 665.90 -69.9 -66.8 -70.2 54 -99 SPO 1997 04 23 16 48 91 3.2 -9 665.90 -69.8 -66.8 -70.2 54 -99 SPO 1997 04 23 16 49 91 3.2 -9 665.90 -69.7 -66.7 -70.1 54 -99 SPO 1997 04 23 16 50 92 3.1 -9 665.90 -69.7 -66.7 -70.1 54 -99 SPO 1997 04 23 16 51 94 3.1 -9 666.00 -69.7 -66.6 -70.1 54 -99 SPO 1997 04 23 16 52 96 3.0 -9 666.00 -69.8 -66.6 -70.1 55 -99 SPO 1997 04 23 16 53 99 3.0 -9 665.90 -70.0 -66.6 -70.2 56 -99 SPO 1997 04 23 16 54 97 3.0 -9 665.90 -70.0 -66.6 -70.2 56 -99 SPO 1997 04 23 16 55 94 3.0 -9 665.90 -70.2 -66.7 -70.3 57 -99 SPO 1997 04 23 16 56 93 3.1 -9 665.90 -70.2 -66.6 -70.3 57 -99 SPO 1997 04 23 16 57 94 3.1 -9 665.90 -70.2 -66.6 -70.4 57 -99 SPO 1997 04 23 16 58 94 3.2 -9 665.90 -70.2 -66.4 -70.4 57 -99 SPO 1997 04 23 16 59 92 3.2 -9 665.90 -70.2 -66.2 -70.3 57 -99 SPO 1997 04 23 17 00 91 3.3 -9 665.90 -70.2 -66.4 -70.3 57 0 SPO 1997 04 23 17 01 91 3.4 -9 665.90 -70.1 -66.3 -70.3 56 -99 SPO 1997 04 23 17 02 91 3.4 -9 665.90 -70.1 -66.2 -70.3 56 -99 SPO 1997 04 23 17 03 91 3.4 -9 665.90 -70.1 -66.3 -70.3 56 -99 SPO 1997 04 23 17 04 91 3.4 -9 665.90 -70.1 -66.3 -70.3 56 -99 SPO 1997 04 23 17 05 90 3.4 -9 665.80 -70.1 -66.4 -70.2 57 -99 SPO 1997 04 23 17 06 90 3.5 -9 665.80 -70.0 -66.4 -70.2 56 -99 SPO 1997 04 23 17 07 90 3.5 -9 665.80 -70.0 -66.3 -70.2 55 -99 SPO 1997 04 23 17 08 91 3.5 -9 665.80 -70.0 -66.2 -70.2 56 -99 SPO 1997 04 23 17 09 91 3.3 -9 665.80 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 17 10 91 3.2 -9 665.80 -70.0 -66.4 -70.2 56 -99 SPO 1997 04 23 17 11 91 3.1 -9 665.80 -70.0 -66.4 -70.2 56 -99 SPO 1997 04 23 17 12 91 3.1 -9 665.90 -70.0 -66.4 -70.2 56 -99 SPO 1997 04 23 17 13 91 3.1 -9 665.90 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 17 14 91 3.1 -9 665.80 -70.0 -66.3 -70.2 55 -99 SPO 1997 04 23 17 15 91 3.2 -9 665.80 -70.1 -66.2 -70.2 56 -99 SPO 1997 04 23 17 16 91 3.3 -9 665.80 -70.2 -66.2 -70.3 57 -99 SPO 1997 04 23 17 17 88 3.4 -9 665.80 -70.2 -66.0 -70.3 57 -99 SPO 1997 04 23 17 18 87 3.5 -9 665.70 -70.2 -66.0 -70.3 56 -99 SPO 1997 04 23 17 19 87 3.5 -9 665.70 -70.2 -65.8 -70.3 56 -99 SPO 1997 04 23 17 20 87 3.6 -9 665.70 -70.2 -65.7 -70.3 57 -99 SPO 1997 04 23 17 21 89 3.7 -9 665.70 -70.2 -65.7 -70.3 57 -99 SPO 1997 04 23 17 22 89 3.6 -9 665.70 -70.1 -65.7 -70.3 57 -99 SPO 1997 04 23 17 23 89 3.6 -9 665.80 -70.0 -65.7 -70.2 56 -99 SPO 1997 04 23 17 24 89 3.6 -9 665.70 -70.0 -65.7 -70.2 56 -99 SPO 1997 04 23 17 25 89 3.6 -9 665.70 -70.0 -65.8 -70.2 56 -99 SPO 1997 04 23 17 26 89 3.5 -9 665.70 -70.0 -65.9 -70.2 55 -99 SPO 1997 04 23 17 27 90 3.5 -9 665.70 -70.1 -65.8 -70.2 55 -99 SPO 1997 04 23 17 28 91 3.5 -9 665.70 -70.1 -65.8 -70.2 55 -99 SPO 1997 04 23 17 29 91 3.5 -9 665.70 -70.1 -65.9 -70.2 55 -99 SPO 1997 04 23 17 30 91 3.4 -9 665.80 -70.1 -66.0 -70.2 55 -99 SPO 1997 04 23 17 31 92 3.4 -9 665.80 -70.1 -66.1 -70.2 55 -99 SPO 1997 04 23 17 32 92 3.4 -9 665.70 -70.1 -66.1 -70.3 56 -99 SPO 1997 04 23 17 33 92 3.4 -9 665.70 -70.1 -66.0 -70.3 57 -99 SPO 1997 04 23 17 34 92 3.5 -9 665.80 -70.2 -66.0 -70.3 57 -99 SPO 1997 04 23 17 35 91 3.4 -9 665.80 -70.2 -66.0 -70.3 57 -99 SPO 1997 04 23 17 36 91 3.4 -9 665.80 -70.1 -66.0 -70.3 57 -99 SPO 1997 04 23 17 37 90 3.4 -9 665.70 -70.1 -65.9 -70.3 56 -99 SPO 1997 04 23 17 38 89 3.5 -9 665.70 -70.1 -65.8 -70.3 56 -99 SPO 1997 04 23 17 39 89 3.5 -9 665.70 -70.0 -65.8 -70.2 55 -99 SPO 1997 04 23 17 40 88 3.5 -9 665.70 -70.0 -65.8 -70.2 55 -99 SPO 1997 04 23 17 41 88 3.5 -9 665.80 -69.9 -65.9 -70.1 54 -99 SPO 1997 04 23 17 42 88 3.4 -9 665.80 -69.9 -66.0 -70.1 55 -99 SPO 1997 04 23 17 43 89 3.4 -9 665.80 -69.8 -66.0 -70.1 55 -99 SPO 1997 04 23 17 44 89 3.4 -9 665.70 -69.8 -66.0 -70.0 56 -99 SPO 1997 04 23 17 45 89 3.4 -9 665.70 -69.8 -66.0 -70.0 56 -99 SPO 1997 04 23 17 46 89 3.2 -9 665.80 -69.8 -65.9 -70.0 57 -99 SPO 1997 04 23 17 47 90 3.1 -9 665.80 -69.8 -66.0 -70.1 56 -99 SPO 1997 04 23 17 48 90 3.1 -9 665.80 -69.9 -66.1 -70.1 57 -99 SPO 1997 04 23 17 49 91 3.0 -9 665.80 -69.9 -66.1 -70.1 57 -99 SPO 1997 04 23 17 50 93 3.0 -9 665.80 -70.0 -66.1 -70.1 57 -99 SPO 1997 04 23 17 51 94 3.0 -9 665.80 -70.0 -66.2 -70.2 57 -99 SPO 1997 04 23 17 52 95 3.0 -9 665.90 -70.0 -66.1 -70.2 57 -99 SPO 1997 04 23 17 53 97 2.9 -9 665.90 -70.1 -66.1 -70.2 57 -99 SPO 1997 04 23 17 54 99 2.8 -9 665.90 -70.2 -66.1 -70.2 58 -99 SPO 1997 04 23 17 55 100 2.7 -9 665.90 -70.1 -66.2 -70.2 57 -99 SPO 1997 04 23 17 56 99 2.8 -9 665.90 -69.9 -66.4 -70.2 57 -99 SPO 1997 04 23 17 57 99 2.8 -9 665.90 -70.1 -66.4 -70.2 59 -99 SPO 1997 04 23 17 58 99 3.0 -9 665.80 -70.1 -66.4 -70.2 58 -99 SPO 1997 04 23 17 59 102 2.9 -9 665.80 -70.0 -66.3 -70.1 57 -99 SPO 1997 04 23 18 00 106 2.9 -9 665.80 -70.1 -66.4 -70.1 57 0 SPO 1997 04 23 18 01 107 2.9 -9 665.80 -70.2 -66.5 -70.2 58 -99 SPO 1997 04 23 18 02 105 2.8 -9 665.80 -70.1 -66.5 -70.2 57 -99 SPO 1997 04 23 18 03 103 2.9 -9 665.80 -70.0 -66.5 -70.1 57 -99 SPO 1997 04 23 18 04 103 2.9 -9 665.80 -69.9 -66.5 -70.0 56 -99 SPO 1997 04 23 18 05 104 2.9 -9 665.80 -69.8 -66.4 -70.0 56 -99 SPO 1997 04 23 18 06 104 3.1 -9 665.70 -69.8 -66.2 -70.0 56 -99 SPO 1997 04 23 18 07 103 3.2 -9 665.70 -69.7 -66.1 -69.9 56 -99 SPO 1997 04 23 18 08 103 3.1 -9 665.70 -69.6 -66.0 -69.8 55 -99 SPO 1997 04 23 18 09 102 3.5 -9 665.70 -69.4 -66.0 -69.7 54 -99 SPO 1997 04 23 18 10 103 3.2 -9 665.80 -69.3 -66.2 -69.6 54 -99 SPO 1997 04 23 18 11 103 3.2 -9 665.80 -69.4 -66.4 -69.6 56 -99 SPO 1997 04 23 18 12 102 3.2 -9 665.80 -69.4 -66.4 -69.7 56 -99 SPO 1997 04 23 18 13 103 3.3 -9 665.70 -69.4 -66.3 -69.6 56 -99 SPO 1997 04 23 18 14 104 3.3 -9 665.80 -69.4 -66.3 -69.6 57 -99 SPO 1997 04 23 18 15 103 3.3 -9 665.80 -69.3 -66.3 -69.6 56 -99 SPO 1997 04 23 18 16 102 3.2 -9 665.80 -69.3 -66.3 -69.6 56 -99 SPO 1997 04 23 18 17 102 3.1 -9 665.80 -69.2 -66.3 -69.5 56 -99 SPO 1997 04 23 18 18 102 3.0 -9 665.80 -69.2 -66.3 -69.5 57 -99 SPO 1997 04 23 18 19 103 3.0 -9 665.80 -69.2 -66.3 -69.5 57 -99 SPO 1997 04 23 18 20 104 3.0 -9 665.80 -69.2 -66.2 -69.5 58 -99 SPO 1997 04 23 18 21 105 3.1 -9 665.80 -69.2 -66.2 -69.5 57 -99 SPO 1997 04 23 18 22 106 3.2 -9 665.80 -69.3 -66.2 -69.5 57 -99 SPO 1997 04 23 18 23 108 3.2 -9 665.80 -69.4 -66.2 -69.5 57 -99 SPO 1997 04 23 18 24 111 3.2 -9 665.80 -69.6 -66.3 -69.6 57 -99 SPO 1997 04 23 18 25 113 3.2 -9 665.90 -69.8 -66.4 -69.8 59 -99 SPO 1997 04 23 18 26 113 3.3 -9 665.90 -70.1 -66.4 -70.0 61 -99 SPO 1997 04 23 18 27 112 3.5 -9 665.90 -70.3 -66.3 -70.2 61 -99 SPO 1997 04 23 18 28 111 3.5 -9 665.80 -70.4 -66.2 -70.3 61 -99 SPO 1997 04 23 18 29 110 3.5 -9 665.80 -70.5 -66.3 -70.4 61 -99 SPO 1997 04 23 18 30 109 3.5 -9 665.80 -70.6 -66.2 -70.4 62 -99 SPO 1997 04 23 18 31 108 3.6 -9 665.80 -70.6 -66.2 -70.4 61 -99 SPO 1997 04 23 18 32 107 3.7 -9 665.80 -70.7 -66.0 -70.5 61 -99 SPO 1997 04 23 18 33 106 3.7 -9 665.80 -70.6 -65.9 -70.5 61 -99 SPO 1997 04 23 18 34 106 3.7 -9 665.80 -70.6 -65.8 -70.5 59 -99 SPO 1997 04 23 18 35 105 3.6 -9 665.80 -70.6 -65.8 -70.5 58 -99 SPO 1997 04 23 18 36 104 3.5 -9 665.80 -70.8 -65.9 -70.6 59 -99 SPO 1997 04 23 18 37 103 3.5 -9 665.80 -70.8 -66.0 -70.7 59 -99 SPO 1997 04 23 18 38 103 3.5 -9 665.80 -70.9 -66.0 -70.7 59 -99 SPO 1997 04 23 18 39 105 3.6 -9 665.80 -70.9 -66.2 -70.7 58 -99 SPO 1997 04 23 18 40 108 3.6 -9 665.80 -70.8 -66.1 -70.7 57 -99 SPO 1997 04 23 18 41 110 3.5 -9 665.80 -70.8 -66.2 -70.7 57 -99 SPO 1997 04 23 18 42 110 3.4 -9 665.80 -70.7 -66.1 -70.7 57 -99 SPO 1997 04 23 18 43 109 3.4 -9 665.80 -70.7 -66.1 -70.7 57 -99 SPO 1997 04 23 18 44 105 3.3 -9 665.90 -70.6 -66.1 -70.7 57 -99 SPO 1997 04 23 18 45 104 3.2 -9 665.90 -70.6 -66.1 -70.7 57 -99 SPO 1997 04 23 18 46 105 3.2 -9 665.90 -70.6 -66.1 -70.7 56 -99 SPO 1997 04 23 18 47 106 3.4 -9 665.80 -70.6 -66.1 -70.7 56 -99 SPO 1997 04 23 18 48 109 3.4 -9 665.80 -70.6 -66.0 -70.7 55 -99 SPO 1997 04 23 18 49 111 3.4 -9 665.80 -70.6 -66.0 -70.7 55 -99 SPO 1997 04 23 18 50 112 3.4 -9 665.80 -70.6 -66.2 -70.7 55 -99 SPO 1997 04 23 18 51 112 3.4 -9 665.80 -70.6 -66.3 -70.6 56 -99 SPO 1997 04 23 18 52 112 3.3 -9 665.80 -70.5 -66.4 -70.6 55 -99 SPO 1997 04 23 18 53 111 3.4 -9 665.80 -70.5 -66.2 -70.6 56 -99 SPO 1997 04 23 18 54 110 3.5 -9 665.90 -70.5 -66.2 -70.6 56 -99 SPO 1997 04 23 18 55 110 3.5 -9 665.80 -70.4 -66.1 -70.6 55 -99 SPO 1997 04 23 18 56 110 3.5 -9 665.80 -70.4 -66.1 -70.5 56 -99 SPO 1997 04 23 18 57 111 3.6 -9 665.80 -70.4 -66.2 -70.5 56 -99 SPO 1997 04 23 18 58 109 3.5 -9 665.80 -70.3 -66.2 -70.5 55 -99 SPO 1997 04 23 18 59 108 3.6 -9 665.80 -70.3 -66.0 -70.5 55 -99 SPO 1997 04 23 19 00 109 3.7 -9 665.80 -70.3 -65.8 -70.5 55 0 SPO 1997 04 23 19 01 111 3.7 -9 665.80 -70.3 -65.8 -70.4 55 -99 SPO 1997 04 23 19 02 111 3.7 -9 665.80 -70.3 -65.9 -70.4 55 -99 SPO 1997 04 23 19 03 110 3.7 -9 665.80 -70.2 -66.0 -70.4 54 -99 SPO 1997 04 23 19 04 107 3.5 -9 665.80 -70.2 -66.1 -70.4 56 -99 SPO 1997 04 23 19 05 107 3.5 -9 665.80 -70.2 -66.2 -70.4 56 -99 SPO 1997 04 23 19 06 107 3.6 -9 665.80 -70.1 -66.3 -70.3 55 -99 SPO 1997 04 23 19 07 109 3.6 -9 665.80 -70.2 -66.4 -70.4 56 -99 SPO 1997 04 23 19 08 110 3.8 -9 665.80 -70.2 -66.3 -70.4 55 -99 SPO 1997 04 23 19 09 110 3.8 -9 665.80 -70.2 -66.2 -70.4 56 -99 SPO 1997 04 23 19 10 108 3.7 -9 665.80 -70.2 -66.2 -70.4 56 -99 SPO 1997 04 23 19 11 104 3.5 -9 665.90 -70.1 -66.3 -70.3 55 -99 SPO 1997 04 23 19 12 102 3.6 -9 665.90 -70.0 -66.4 -70.3 54 -99 SPO 1997 04 23 19 13 105 3.7 -9 665.90 -70.0 -66.4 -70.2 54 -99 SPO 1997 04 23 19 14 106 3.8 -9 665.80 -70.0 -66.4 -70.2 55 -99 SPO 1997 04 23 19 15 105 3.8 -9 665.80 -70.0 -66.3 -70.2 55 -99 SPO 1997 04 23 19 16 104 3.6 -9 665.80 -70.0 -66.4 -70.2 56 -99 SPO 1997 04 23 19 17 102 3.6 -9 665.80 -69.9 -66.4 -70.2 55 -99 SPO 1997 04 23 19 18 101 3.7 -9 665.80 -69.9 -66.4 -70.2 55 -99 SPO 1997 04 23 19 19 100 3.7 -9 665.80 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 19 20 97 3.8 -9 665.80 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 19 21 98 3.9 -9 665.80 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 19 22 98 3.8 -9 665.80 -70.0 -66.3 -70.2 56 -99 SPO 1997 04 23 19 23 97 3.8 -9 665.80 -69.9 -66.3 -70.1 55 -99 SPO 1997 04 23 19 24 95 3.8 -9 665.90 -69.9 -66.3 -70.1 56 -99 SPO 1997 04 23 19 25 96 3.8 -9 665.80 -69.9 -66.3 -70.1 56 -99 SPO 1997 04 23 19 26 98 3.8 -9 665.80 -69.8 -66.3 -70.1 55 -99 SPO 1997 04 23 19 27 99 3.8 -9 665.80 -69.8 -66.2 -70.1 55 -99 SPO 1997 04 23 19 28 96 3.7 -9 665.80 -69.8 -66.2 -70.0 55 -99 SPO 1997 04 23 19 29 95 3.7 -9 665.90 -69.9 -66.4 -70.1 56 -99 SPO 1997 04 23 19 30 95 3.7 -9 665.90 -69.9 -66.4 -70.0 56 -99 SPO 1997 04 23 19 31 95 3.6 -9 665.90 -69.8 -66.5 -70.0 55 -99 SPO 1997 04 23 19 32 95 3.5 -9 665.90 -69.8 -66.6 -70.0 55 -99 SPO 1997 04 23 19 33 95 3.4 -9 665.90 -69.8 -66.6 -70.0 55 -99 SPO 1997 04 23 19 34 95 3.2 -9 666.00 -69.8 -66.6 -70.0 55 -99 SPO 1997 04 23 19 35 92 3.1 -9 666.00 -69.8 -66.6 -70.0 55 -99 SPO 1997 04 23 19 36 92 3.1 -9 666.00 -69.8 -66.6 -70.0 56 -99 SPO 1997 04 23 19 37 93 3.1 -9 666.00 -69.9 -66.6 -70.1 57 -99 SPO 1997 04 23 19 38 94 3.2 -9 666.00 -70.0 -66.6 -70.1 57 -99 SPO 1997 04 23 19 39 94 3.2 -9 665.90 -70.0 -66.5 -70.1 57 -99 SPO 1997 04 23 19 40 94 3.3 -9 665.90 -70.0 -66.4 -70.1 57 -99 SPO 1997 04 23 19 41 92 3.3 -9 666.00 -70.0 -66.4 -70.1 57 -99 SPO 1997 04 23 19 42 90 3.3 -9 666.00 -70.0 -66.2 -70.1 57 -99 SPO 1997 04 23 19 43 90 3.3 -9 666.00 -69.9 -66.2 -70.1 56 -99 SPO 1997 04 23 19 44 91 3.4 -9 666.00 -69.9 -66.1 -70.1 56 -99 SPO 1997 04 23 19 45 95 3.4 -9 665.90 -69.9 -66.1 -70.1 56 -99 SPO 1997 04 23 19 46 96 3.2 -9 665.90 -69.9 -66.1 -70.0 56 -99 SPO 1997 04 23 19 47 95 3.2 -9 666.00 -69.9 -66.0 -70.1 57 -99 SPO 1997 04 23 19 48 92 3.1 -9 666.00 -69.9 -66.0 -70.1 57 -99 SPO 1997 04 23 19 49 91 3.1 -9 666.00 -70.0 -66.0 -70.1 58 -99 SPO 1997 04 23 19 50 95 3.3 -9 666.00 -70.0 -66.0 -70.1 58 -99 SPO 1997 04 23 19 51 97 3.4 -9 665.90 -70.0 -66.0 -70.1 57 -99 SPO 1997 04 23 19 52 97 3.4 -9 665.90 -70.0 -65.8 -70.1 57 -99 SPO 1997 04 23 19 53 95 3.4 -9 665.90 -70.0 -65.7 -70.1 57 -99 SPO 1997 04 23 19 54 94 3.4 -9 665.90 -70.0 -65.7 -70.1 57 -99 SPO 1997 04 23 19 55 96 3.5 -9 665.90 -70.0 -65.7 -70.1 57 -99 SPO 1997 04 23 19 56 98 3.5 -9 665.90 -70.0 -65.6 -70.1 56 -99 SPO 1997 04 23 19 57 100 3.5 -9 665.80 -70.0 -65.6 -70.1 56 -99 SPO 1997 04 23 19 58 100 3.4 -9 665.90 -70.0 -65.6 -70.1 55 -99 SPO 1997 04 23 19 59 98 3.3 -9 665.90 -70.0 -65.8 -70.1 56 -99 SPO 1997 04 23 20 00 97 3.3 -9 666.00 -70.0 -65.8 -70.1 56 0 SPO 1997 04 23 20 01 98 3.3 -9 666.00 -70.0 -65.8 -70.1 57 -99 SPO 1997 04 23 20 02 99 3.3 -9 666.00 -70.0 -65.8 -70.1 57 -99 SPO 1997 04 23 20 03 100 3.2 -9 666.00 -70.0 -65.7 -70.1 57 -99 SPO 1997 04 23 20 04 100 3.1 -9 666.00 -69.9 -65.8 -70.0 56 -99 SPO 1997 04 23 20 05 100 3.2 -9 666.00 -69.9 -65.8 -70.0 56 -99 SPO 1997 04 23 20 06 100 3.3 -9 666.00 -69.9 -65.8 -70.0 56 -99 SPO 1997 04 23 20 07 98 3.5 -9 666.00 -69.8 -65.7 -69.9 55 -99 SPO 1997 04 23 20 08 97 3.6 -9 665.90 -69.8 -65.6 -69.9 56 -99 SPO 1997 04 23 20 09 98 3.7 -9 665.90 -69.7 -65.4 -69.9 55 -99 SPO 1997 04 23 20 10 98 3.8 -9 665.80 -69.6 -65.3 -69.8 55 -99 SPO 1997 04 23 20 11 95 3.7 -9 665.90 -69.5 -65.3 -69.8 55 -99 SPO 1997 04 23 20 12 93 3.7 -9 665.90 -69.5 -65.2 -69.8 57 -99 SPO 1997 04 23 20 13 91 3.8 -9 665.90 -69.4 -65.2 -69.7 57 -99 SPO 1997 04 23 20 14 92 3.8 -9 665.90 -69.4 -65.2 -69.7 58 -99 SPO 1997 04 23 20 15 92 3.9 -9 665.90 -69.4 -65.3 -69.7 58 -99 SPO 1997 04 23 20 16 92 4.1 -9 665.90 -69.4 -65.4 -69.7 58 -99 SPO 1997 04 23 20 17 93 4.1 -9 665.90 -69.4 -65.5 -69.7 58 -99 SPO 1997 04 23 20 18 96 4.1 -9 665.80 -69.3 -65.5 -69.6 57 -99 SPO 1997 04 23 20 19 97 4.2 -9 665.80 -69.3 -65.4 -69.6 57 -99 SPO 1997 04 23 20 20 97 4.4 -9 665.80 -69.2 -65.4 -69.5 56 -99 SPO 1997 04 23 20 21 95 4.7 -9 665.80 -69.2 -65.4 -69.5 57 -99 SPO 1997 04 23 20 22 94 4.8 -9 665.80 -69.2 -65.4 -69.5 58 -99 SPO 1997 04 23 20 23 94 4.9 -9 665.80 -69.2 -65.4 -69.5 58 -99 SPO 1997 04 23 20 24 95 4.9 -9 665.80 -69.1 -65.3 -69.4 58 -99 SPO 1997 04 23 20 25 96 4.8 -9 665.80 -69.1 -65.4 -69.4 58 -99 SPO 1997 04 23 20 26 95 4.8 -9 665.80 -69.1 -65.5 -69.4 58 -99 SPO 1997 04 23 20 27 93 4.7 -9 665.80 -69.1 -65.5 -69.4 58 -99 SPO 1997 04 23 20 28 92 4.6 -9 665.80 -69.1 -65.6 -69.4 58 -99 SPO 1997 04 23 20 29 93 4.6 -9 665.80 -69.1 -65.5 -69.4 57 -99 SPO 1997 04 23 20 30 95 4.8 -9 665.80 -69.2 -65.5 -69.5 58 -99 SPO 1997 04 23 20 31 96 4.9 -9 665.80 -69.3 -65.4 -69.5 58 -99 SPO 1997 04 23 20 32 96 4.8 -9 665.70 -69.3 -65.2 -69.5 58 -99 SPO 1997 04 23 20 33 97 4.8 -9 665.70 -69.3 -65.3 -69.5 58 -99 SPO 1997 04 23 20 34 96 4.8 -9 665.70 -69.3 -65.4 -69.5 58 -99 SPO 1997 04 23 20 35 96 4.6 -9 665.70 -69.3 -65.4 -69.5 59 -99 SPO 1997 04 23 20 36 97 4.6 -9 665.80 -69.3 -65.4 -69.5 59 -99 SPO 1997 04 23 20 37 98 4.7 -9 665.70 -69.4 -65.4 -69.5 59 -99 SPO 1997 04 23 20 38 98 4.8 -9 665.70 -69.6 -65.6 -69.6 60 -99 SPO 1997 04 23 20 39 97 4.8 -9 665.70 -69.7 -65.6 -69.7 60 -99 SPO 1997 04 23 20 40 97 4.7 -9 665.70 -69.7 -65.7 -69.7 59 -99 SPO 1997 04 23 20 41 97 4.5 -9 665.70 -69.6 -65.7 -69.7 57 -99 SPO 1997 04 23 20 42 98 4.4 -9 665.70 -69.6 -65.7 -69.7 57 -99 SPO 1997 04 23 20 43 98 4.4 -9 665.70 -69.6 -65.8 -69.7 57 -99 SPO 1997 04 23 20 44 98 4.5 -9 665.70 -69.7 -65.9 -69.8 57 -99 SPO 1997 04 23 20 45 98 4.6 -9 665.70 -69.7 -65.9 -69.8 57 -99 SPO 1997 04 23 20 46 97 4.7 -9 665.70 -69.8 -65.9 -69.8 58 -99 SPO 1997 04 23 20 47 97 4.8 -9 665.60 -69.7 -65.7 -69.8 57 -99 SPO 1997 04 23 20 48 96 4.9 -9 665.60 -69.7 -65.6 -69.8 58 -99 SPO 1997 04 23 20 49 94 4.8 -9 665.60 -69.6 -65.6 -69.8 57 -99 SPO 1997 04 23 20 50 92 4.7 -9 665.60 -69.6 -65.6 -69.7 57 -99 SPO 1997 04 23 20 51 91 4.6 -9 665.60 -69.5 -65.5 -69.7 56 -99 SPO 1997 04 23 20 52 90 4.5 -9 665.60 -69.4 -65.5 -69.7 55 -99 SPO 1997 04 23 20 53 90 4.6 -9 665.60 -69.4 -65.5 -69.6 55 -99 SPO 1997 04 23 20 54 90 4.8 -9 665.60 -69.4 -65.4 -69.6 56 -99 SPO 1997 04 23 20 55 91 5.0 -9 665.60 -69.3 -65.4 -69.6 55 -99 SPO 1997 04 23 20 56 91 5.0 -9 665.50 -69.2 -65.4 -69.5 55 -99 SPO 1997 04 23 20 57 90 4.9 -9 665.50 -69.2 -65.4 -69.5 56 -99 SPO 1997 04 23 20 58 89 4.9 -9 665.60 -69.2 -65.4 -69.5 56 -99 SPO 1997 04 23 20 59 88 4.8 -9 665.60 -69.2 -65.5 -69.5 58 -99 SPO 1997 04 23 21 00 88 4.7 -9 665.60 -69.1 -65.5 -69.4 57 0 SPO 1997 04 23 21 01 89 4.8 -9 665.50 -69.0 -65.5 -69.4 57 -99 SPO 1997 04 23 21 02 89 4.7 -9 665.50 -69.0 -65.4 -69.4 57 -99 SPO 1997 04 23 21 03 87 4.6 -9 665.60 -68.9 -65.6 -69.3 56 -99 SPO 1997 04 23 21 04 85 4.3 -9 665.60 -68.9 -65.7 -69.3 56 -99 SPO 1997 04 23 21 05 84 4.1 -9 665.70 -69.0 -65.8 -69.3 56 -99 SPO 1997 04 23 21 06 88 4.2 -9 665.70 -69.0 -65.9 -69.3 56 -99 SPO 1997 04 23 21 07 90 4.3 -9 665.60 -69.0 -65.9 -69.3 57 -99 SPO 1997 04 23 21 08 91 4.4 -9 665.60 -69.0 -65.8 -69.3 58 -99 SPO 1997 04 23 21 09 90 4.5 -9 665.60 -69.0 -65.7 -69.3 58 -99 SPO 1997 04 23 21 10 87 4.6 -9 665.60 -69.1 -65.8 -69.4 58 -99 SPO 1997 04 23 21 11 84 4.6 -9 665.60 -69.1 -65.8 -69.4 58 -99 SPO 1997 04 23 21 12 85 4.7 -9 665.60 -69.2 -65.8 -69.4 59 -99 SPO 1997 04 23 21 13 88 4.8 -9 665.60 -69.2 -65.8 -69.4 58 -99 SPO 1997 04 23 21 14 88 4.9 -9 665.50 -69.1 -65.8 -69.4 58 -99 SPO 1997 04 23 21 15 85 4.8 -9 665.50 -69.1 -65.8 -69.4 58 -99 SPO 1997 04 23 21 16 82 4.7 -9 665.60 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 17 79 4.6 -9 665.60 -69.1 -65.7 -69.3 57 -99 SPO 1997 04 23 21 18 75 4.5 -9 665.70 -69.1 -65.8 -69.3 57 -99 SPO 1997 04 23 21 19 81 4.5 -9 665.60 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 20 83 4.6 -9 665.60 -69.2 -65.8 -69.3 59 -99 SPO 1997 04 23 21 21 82 4.6 -9 665.60 -69.2 -65.8 -69.3 59 -99 SPO 1997 04 23 21 22 82 4.6 -9 665.60 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 23 79 4.6 -9 665.60 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 24 77 4.7 -9 665.70 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 25 78 4.6 -9 665.70 -69.2 -65.8 -69.3 58 -99 SPO 1997 04 23 21 26 80 4.8 -9 665.60 -69.1 -65.8 -69.3 58 -99 SPO 1997 04 23 21 27 84 4.8 -9 665.60 -69.1 -65.6 -69.3 58 -99 SPO 1997 04 23 21 28 84 4.8 -9 665.60 -69.1 -65.5 -69.3 58 -99 SPO 1997 04 23 21 29 81 4.5 -9 665.60 -69.1 -65.5 -69.3 58 -99 SPO 1997 04 23 21 30 78 4.4 -9 665.70 -69.1 -65.6 -69.3 58 -99 SPO 1997 04 23 21 31 79 4.6 -9 665.70 -69.1 -65.6 -69.3 58 -99 SPO 1997 04 23 21 32 84 4.8 -9 665.60 -69.1 -65.6 -69.3 58 -99 SPO 1997 04 23 21 33 85 4.7 -9 665.60 -69.1 -65.5 -69.3 58 -99 SPO 1997 04 23 21 34 85 4.6 -9 665.60 -69.1 -65.6 -69.3 59 -99 SPO 1997 04 23 21 35 83 4.4 -9 665.60 -69.1 -65.6 -69.3 59 -99 SPO 1997 04 23 21 36 81 4.5 -9 665.70 -69.0 -65.7 -69.3 58 -99 SPO 1997 04 23 21 37 79 4.8 -9 665.70 -69.1 -65.7 -69.3 58 -99 SPO 1997 04 23 21 38 82 4.9 -9 665.70 -69.1 -65.7 -69.3 58 -99 SPO 1997 04 23 21 39 84 5.0 -9 665.60 -69.2 -65.7 -69.3 58 -99 SPO 1997 04 23 21 40 82 5.1 -9 665.60 -69.1 -65.6 -69.3 58 -99 SPO 1997 04 23 21 41 82 5.1 -9 665.60 -69.0 -65.5 -69.2 58 -99 SPO 1997 04 23 21 42 82 5.2 -9 665.60 -69.0 -65.5 -69.2 58 -99 SPO 1997 04 23 21 43 80 5.3 -9 665.60 -69.0 -65.5 -69.2 58 -99 SPO 1997 04 23 21 44 78 5.4 -9 665.60 -68.9 -65.5 -69.2 58 -99 SPO 1997 04 23 21 45 79 5.4 -9 665.60 -68.9 -65.5 -69.2 58 -99 SPO 1997 04 23 21 46 80 5.3 -9 665.60 -68.9 -65.4 -69.1 58 -99 SPO 1997 04 23 21 47 83 5.2 -9 665.60 -68.9 -65.4 -69.1 58 -99 SPO 1997 04 23 21 48 83 5.1 -9 665.60 -68.8 -65.2 -69.1 58 -99 SPO 1997 04 23 21 49 83 5.0 -9 665.60 -68.8 -65.2 -69.1 58 -99 SPO 1997 04 23 21 50 80 5.0 -9 665.70 -68.9 -65.2 -69.1 58 -99 SPO 1997 04 23 21 51 81 5.2 -9 665.70 -68.9 -65.3 -69.1 57 -99 SPO 1997 04 23 21 52 83 5.1 -9 665.60 -68.9 -65.3 -69.1 57 -99 SPO 1997 04 23 21 53 82 5.1 -9 665.60 -69.0 -65.4 -69.1 58 -99 SPO 1997 04 23 21 54 81 5.1 -9 665.60 -69.0 -65.4 -69.2 58 -99 SPO 1997 04 23 21 55 81 5.1 -9 665.60 -69.0 -65.4 -69.2 58 -99 SPO 1997 04 23 21 56 82 5.0 -9 665.60 -69.0 -65.2 -69.1 59 -99 SPO 1997 04 23 21 57 82 5.0 -9 665.60 -69.0 -65.1 -69.1 59 -99 SPO 1997 04 23 21 58 82 4.8 -9 665.60 -69.0 -65.0 -69.2 59 -99 SPO 1997 04 23 21 59 83 4.8 -9 665.60 -69.0 -65.0 -69.2 58 -99 SPO 1997 04 23 22 00 85 4.9 -9 665.60 -69.0 -65.0 -69.1 58 0 SPO 1997 04 23 22 01 83 5.0 -9 665.60 -69.0 -65.0 -69.1 58 -99 SPO 1997 04 23 22 02 83 5.0 -9 665.60 -69.0 -65.0 -69.2 58 -99 SPO 1997 04 23 22 03 83 4.9 -9 665.60 -69.1 -65.1 -69.2 58 -99 SPO 1997 04 23 22 04 81 4.9 -9 665.60 -69.1 -65.1 -69.2 58 -99 SPO 1997 04 23 22 05 79 4.8 -9 665.70 -69.2 -65.3 -69.3 59 -99 SPO 1997 04 23 22 06 79 4.9 -9 665.70 -69.2 -65.3 -69.3 59 -99 SPO 1997 04 23 22 07 81 4.9 -9 665.70 -69.3 -65.3 -69.4 60 -99 SPO 1997 04 23 22 08 84 4.8 -9 665.60 -69.4 -65.2 -69.4 61 -99 SPO 1997 04 23 22 09 84 4.8 -9 665.60 -69.3 -65.2 -69.4 59 -99 SPO 1997 04 23 22 10 80 4.8 -9 665.70 -69.4 -65.3 -69.4 60 -99 SPO 1997 04 23 22 11 77 4.8 -9 665.70 -69.4 -65.4 -69.4 59 -99 SPO 1997 04 23 22 12 76 4.8 -9 665.70 -69.4 -65.3 -69.4 59 -99 SPO 1997 04 23 22 13 77 4.6 -9 665.70 -69.4 -65.3 -69.5 58 -99 SPO 1997 04 23 22 14 80 4.6 -9 665.70 -69.4 -65.3 -69.5 58 -99 SPO 1997 04 23 22 15 82 4.5 -9 665.70 -69.4 -65.3 -69.4 58 -99 SPO 1997 04 23 22 16 81 4.4 -9 665.70 -69.4 -65.3 -69.4 58 -99 SPO 1997 04 23 22 17 78 4.6 -9 665.70 -69.3 -65.4 -69.4 58 -99 SPO 1997 04 23 22 18 76 4.9 -9 665.70 -69.3 -65.3 -69.4 59 -99 SPO 1997 04 23 22 19 74 5.0 -9 665.70 -69.2 -65.2 -69.4 58 -99 SPO 1997 04 23 22 20 75 4.9 -9 665.70 -69.1 -65.2 -69.3 58 -99 SPO 1997 04 23 22 21 80 4.8 -9 665.70 -69.1 -65.2 -69.3 57 -99 SPO 1997 04 23 22 22 83 4.7 -9 665.60 -69.1 -65.2 -69.3 58 -99 SPO 1997 04 23 22 23 83 4.5 -9 665.60 -69.1 -65.3 -69.3 58 -99 SPO 1997 04 23 22 24 80 4.4 -9 665.70 -69.2 -65.4 -69.4 58 -99 SPO 1997 04 23 22 25 78 4.2 -9 665.70 -69.2 -65.5 -69.4 58 -99 SPO 1997 04 23 22 26 78 4.1 -9 665.80 -69.3 -65.6 -69.4 58 -99 SPO 1997 04 23 22 27 83 4.2 -9 665.70 -69.3 -65.5 -69.4 57 -99 SPO 1997 04 23 22 28 87 4.2 -9 665.70 -69.3 -65.4 -69.4 57 -99 SPO 1997 04 23 22 29 87 4.1 -9 665.70 -69.4 -65.4 -69.5 58 -99 SPO 1997 04 23 22 30 84 3.9 -9 665.80 -69.5 -65.4 -69.5 59 -99 SPO 1997 04 23 22 31 83 3.9 -9 665.80 -69.6 -65.4 -69.6 60 -99 SPO 1997 04 23 22 32 82 3.9 -9 665.80 -69.7 -65.4 -69.6 60 -99 SPO 1997 04 23 22 33 83 3.9 -9 665.80 -69.7 -65.4 -69.7 60 -99 SPO 1997 04 23 22 34 86 4.0 -9 665.80 -69.8 -65.4 -69.8 60 -99 SPO 1997 04 23 22 35 90 4.0 -9 665.80 -70.0 -65.4 -69.8 61 -99 SPO 1997 04 23 22 36 87 3.9 -9 665.80 -70.2 -65.4 -70.0 61 -99 SPO 1997 04 23 22 37 83 3.9 -9 665.80 -70.4 -65.4 -70.0 62 -99 SPO 1997 04 23 22 38 83 4.0 -9 665.80 -70.4 -65.4 -70.1 61 -99 SPO 1997 04 23 22 39 85 4.1 -9 665.80 -70.4 -65.3 -70.1 61 -99 SPO 1997 04 23 22 40 86 4.2 -9 665.80 -70.3 -65.2 -70.1 59 -99 SPO 1997 04 23 22 41 87 4.0 -9 665.80 -70.3 -65.3 -70.1 58 -99 SPO 1997 04 23 22 42 89 3.9 -9 665.80 -70.2 -65.3 -70.0 57 -99 SPO 1997 04 23 22 43 91 3.9 -9 665.80 -70.0 -65.3 -69.9 57 -99 SPO 1997 04 23 22 44 92 4.0 -9 665.80 -70.0 -65.3 -69.9 57 -99 SPO 1997 04 23 22 45 91 4.1 -9 665.80 -69.8 -65.3 -69.8 55 -99 SPO 1997 04 23 22 46 91 4.0 -9 665.90 -69.6 -65.2 -69.7 54 -99 SPO 1997 04 23 22 47 92 4.0 -9 665.90 -69.5 -65.3 -69.6 53 -99 SPO 1997 04 23 22 48 96 4.1 -9 665.80 -69.4 -65.2 -69.5 53 -99 SPO 1997 04 23 22 49 97 4.2 -9 665.80 -69.3 -65.2 -69.5 53 -99 SPO 1997 04 23 22 50 99 4.1 -9 665.80 -69.3 -65.3 -69.5 54 -99 SPO 1997 04 23 22 51 100 4.0 -9 665.80 -69.2 -65.3 -69.4 53 -99 SPO 1997 04 23 22 52 101 4.0 -9 665.80 -69.1 -65.4 -69.4 53 -99 SPO 1997 04 23 22 53 100 4.0 -9 665.80 -69.1 -65.4 -69.4 54 -99 SPO 1997 04 23 22 54 103 4.0 -9 665.80 -69.1 -65.4 -69.3 54 -99 SPO 1997 04 23 22 55 105 4.2 -9 665.80 -69.1 -65.3 -69.3 54 -99 SPO 1997 04 23 22 56 105 4.1 -9 665.80 -69.1 -65.3 -69.3 55 -99 SPO 1997 04 23 22 57 105 4.0 -9 665.90 -69.1 -65.4 -69.3 55 -99 SPO 1997 04 23 22 58 105 4.0 -9 665.90 -69.1 -65.4 -69.4 56 -99 SPO 1997 04 23 22 59 104 4.0 -9 665.90 -69.2 -65.5 -69.4 57 -99 SPO 1997 04 23 23 00 105 4.0 -9 665.90 -69.4 -65.6 -69.5 58 0 SPO 1997 04 23 23 01 105 4.1 -9 665.90 -69.5 -65.6 -69.6 59 -99 SPO 1997 04 23 23 02 103 4.2 -9 665.90 -69.6 -65.6 -69.6 59 -99 SPO 1997 04 23 23 03 103 4.2 -9 665.80 -69.6 -65.6 -69.7 59 -99 SPO 1997 04 23 23 04 102 4.1 -9 665.90 -69.8 -65.7 -69.8 61 -99 SPO 1997 04 23 23 05 100 4.2 -9 665.90 -69.9 -65.8 -69.9 62 -99 SPO 1997 04 23 23 06 100 4.3 -9 665.90 -70.0 -65.8 -70.0 61 -99 SPO 1997 04 23 23 07 101 4.3 -9 665.90 -70.2 -65.7 -70.0 62 -99 SPO 1997 04 23 23 08 103 4.2 -9 665.90 -70.2 -65.6 -70.1 61 -99 SPO 1997 04 23 23 09 104 4.0 -9 666.00 -70.4 -65.7 -70.2 61 -99 SPO 1997 04 23 23 10 104 3.7 -9 666.00 -70.5 -65.9 -70.3 60 -99 SPO 1997 04 23 23 11 105 3.8 -9 666.00 -70.6 -66.0 -70.4 59 -99 SPO 1997 04 23 23 12 108 4.0 -9 666.00 -70.6 -66.0 -70.4 58 -99 SPO 1997 04 23 23 13 107 4.1 -9 666.00 -70.7 -65.8 -70.5 58 -99 SPO 1997 04 23 23 14 107 4.0 -9 666.00 -70.6 -65.8 -70.5 57 -99 SPO 1997 04 23 23 15 103 3.8 -9 666.00 -70.5 -65.8 -70.4 57 -99 SPO 1997 04 23 23 16 99 3.9 -9 666.10 -70.4 -65.8 -70.4 56 -99 SPO 1997 04 23 23 17 100 3.7 -9 666.10 -70.4 -65.8 -70.4 56 -99 SPO 1997 04 23 23 18 103 3.6 -9 666.10 -70.3 -65.9 -70.3 55 -99 SPO 1997 04 23 23 19 103 3.6 -9 666.10 -70.2 -65.9 -70.3 55 -99 SPO 1997 04 23 23 20 103 3.6 -9 666.10 -70.2 -65.9 -70.2 55 -99 SPO 1997 04 23 23 21 102 3.7 -9 666.10 -70.1 -65.8 -70.2 55 -99 SPO 1997 04 23 23 22 99 3.9 -9 666.00 -70.1 -65.8 -70.2 55 -99 SPO 1997 04 23 23 23 97 4.0 -9 666.10 -70.2 -65.8 -70.3 56 -99 SPO 1997 04 23 23 24 98 4.0 -9 666.10 -70.2 -65.8 -70.3 55 -99 SPO 1997 04 23 23 25 100 3.9 -9 666.00 -70.3 -65.8 -70.3 55 -99 SPO 1997 04 23 23 26 101 3.7 -9 666.00 -70.4 -65.7 -70.4 56 -99 SPO 1997 04 23 23 27 102 3.6 -9 666.00 -70.4 -65.6 -70.4 56 -99 SPO 1997 04 23 23 28 103 3.7 -9 666.00 -70.3 -65.6 -70.4 56 -99 SPO 1997 04 23 23 29 103 3.7 -9 666.00 -70.4 -65.6 -70.4 57 -99 SPO 1997 04 23 23 30 101 3.8 -9 666.00 -70.4 -65.7 -70.5 57 -99 SPO 1997 04 23 23 31 100 3.8 -9 666.00 -70.5 -65.7 -70.5 59 -99 SPO 1997 04 23 23 32 99 3.8 -9 666.00 -70.6 -65.8 -70.6 59 -99 SPO 1997 04 23 23 33 99 3.7 -9 666.00 -70.7 -65.8 -70.7 59 -99 SPO 1997 04 23 23 34 101 3.5 -9 666.00 -70.8 -65.7 -70.7 59 -99 SPO 1997 04 23 23 35 102 3.5 -9 666.00 -70.8 -65.8 -70.7 57 -99 SPO 1997 04 23 23 36 101 3.7 -9 666.00 -70.9 -65.8 -70.8 57 -99 SPO 1997 04 23 23 37 100 3.7 -9 666.00 -70.9 -66.0 -70.8 57 -99 SPO 1997 04 23 23 38 99 3.8 -9 666.00 -71.0 -66.0 -70.8 57 -99 SPO 1997 04 23 23 39 97 3.7 -9 666.00 -71.0 -65.9 -70.9 56 -99 SPO 1997 04 23 23 40 97 3.6 -9 666.00 -71.1 -65.9 -70.9 57 -99 SPO 1997 04 23 23 41 98 3.7 -9 666.00 -71.0 -65.8 -70.9 56 -99 SPO 1997 04 23 23 42 99 3.8 -9 666.00 -71.0 -65.6 -70.9 56 -99 SPO 1997 04 23 23 43 97 3.8 -9 666.00 -71.0 -65.6 -70.9 56 -99 SPO 1997 04 23 23 44 97 3.7 -9 666.00 -70.9 -65.6 -70.9 54 -99 SPO 1997 04 23 23 45 97 3.8 -9 666.00 -70.9 -65.6 -70.9 54 -99 SPO 1997 04 23 23 46 97 3.8 -9 665.90 -70.9 -65.5 -70.9 54 -99 SPO 1997 04 23 23 47 97 3.9 -9 666.00 -70.9 -65.4 -70.9 53 -99 SPO 1997 04 23 23 48 98 4.0 -9 665.90 -70.9 -65.3 -71.0 52 -99 SPO 1997 04 23 23 49 98 4.2 -9 665.90 -71.0 -65.1 -71.0 52 -99 SPO 1997 04 23 23 50 96 4.2 -9 665.90 -71.0 -65.0 -71.0 52 -99 SPO 1997 04 23 23 51 96 4.1 -9 666.00 -71.0 -65.0 -71.0 53 -99 SPO 1997 04 23 23 52 97 4.0 -9 666.00 -70.9 -65.0 -71.0 53 -99 SPO 1997 04 23 23 53 97 3.9 -9 666.00 -70.8 -65.2 -71.0 53 -99 SPO 1997 04 23 23 54 100 3.7 -9 665.90 -70.8 -65.2 -70.9 53 -99 SPO 1997 04 23 23 55 101 3.8 -9 665.90 -70.6 -65.2 -70.8 53 -99 SPO 1997 04 23 23 56 99 3.9 -9 665.90 -70.6 -65.1 -70.8 53 -99 SPO 1997 04 23 23 57 98 3.8 -9 666.00 -70.4 -65.0 -70.7 51 -99 SPO 1997 04 23 23 58 96 3.9 -9 665.90 -70.4 -65.0 -70.7 -99 -99 SPO 1997 04 23 23 59 96 3.8 -9 665.90 -70.4 -64.9 -70.7 -99 -99 SPO 1997 04 24 00 00 96 3.8 -9 666.10 -70.4 -65.0 -70.7 -99 0 SPO 1997 04 24 00 01 95 3.8 -9 666.00 -70.4 -64.9 -70.7 -99 -99 SPO 1997 04 24 00 02 92 3.8 -9 666.00 -70.4 -64.8 -70.7 -99 -99 SPO 1997 04 24 00 03 91 3.9 -9 666.00 -70.4 -64.8 -70.7 -99 -99 SPO 1997 04 24 00 04 92 4.0 -9 666.00 -70.3 -64.8 -70.6 -99 -99 SPO 1997 04 24 00 05 94 4.1 -9 665.90 -70.2 -64.7 -70.5 -99 -99 SPO 1997 04 24 00 06 91 4.1 -9 665.90 -70.0 -64.6 -70.4 -99 -99 SPO 1997 04 24 00 07 89 4.0 -9 665.90 -69.9 -64.7 -70.4 -99 -99 SPO 1997 04 24 00 08 86 4.1 -9 665.90 -69.8 -64.8 -70.2 -99 -99 SPO 1997 04 24 00 09 84 4.1 -9 666.00 -69.7 -64.8 -70.2 -99 -99 SPO 1997 04 24 00 10 87 4.1 -9 665.90 -69.6 -64.7 -70.0 -99 -99 SPO 1997 04 24 00 11 90 4.1 -9 665.90 -69.4 -64.5 -69.9 -99 -99 SPO 1997 04 24 00 12 87 4.2 -9 665.90 -69.3 -64.4 -69.8 -99 -99 SPO 1997 04 24 00 13 84 4.1 -9 666.00 -69.2 -64.6 -69.8 51 -99 SPO 1997 04 24 00 14 84 4.1 -9 665.90 -69.2 -64.6 -69.7 52 -99 SPO 1997 04 24 00 15 84 4.3 -9 665.90 -69.2 -64.7 -69.7 53 -99 SPO 1997 04 24 00 16 86 4.4 -9 665.90 -69.1 -64.6 -69.6 52 -99 SPO 1997 04 24 00 17 83 4.3 -9 665.90 -69.1 -64.5 -69.6 53 -99 SPO 1997 04 24 00 18 78 4.4 -9 666.00 -69.0 -64.6 -69.5 54 -99 SPO 1997 04 24 00 19 78 4.5 -9 666.00 -69.0 -64.8 -69.4 55 -99 SPO 1997 04 24 00 20 79 4.7 -9 665.90 -68.9 -64.8 -69.4 55 -99 SPO 1997 04 24 00 21 84 4.8 -9 665.90 -68.9 -64.7 -69.3 55 -99 SPO 1997 04 24 00 22 83 4.8 -9 665.80 -68.8 -64.5 -69.3 55 -99 SPO 1997 04 24 00 23 80 4.8 -9 665.80 -68.7 -64.5 -69.2 54 -99 SPO 1997 04 24 00 24 78 5.0 -9 665.90 -68.8 -64.5 -69.2 55 -99 SPO 1997 04 24 00 25 79 5.0 -9 665.80 -68.7 -64.4 -69.1 54 -99 SPO 1997 04 24 00 26 82 5.0 -9 665.80 -68.6 -64.2 -69.1 55 -99 SPO 1997 04 24 00 27 80 5.1 -9 665.80 -68.6 -64.1 -69.0 55 -99 SPO 1997 04 24 00 28 78 5.3 -9 665.80 -68.6 -64.1 -69.0 56 -99 SPO 1997 04 24 00 29 77 5.2 -9 665.80 -68.7 -64.2 -69.0 58 -99 SPO 1997 04 24 00 30 77 5.1 -9 665.80 -68.6 -64.2 -69.0 57 -99 SPO 1997 04 24 00 31 78 5.0 -9 665.80 -68.7 -64.2 -69.0 58 -99 SPO 1997 04 24 00 32 79 4.8 -9 665.80 -68.7 -64.3 -69.0 58 -99 SPO 1997 04 24 00 33 80 4.6 -9 665.80 -68.7 -64.4 -69.0 58 -99 SPO 1997 04 24 00 34 79 4.5 -9 665.80 -68.8 -64.4 -69.0 59 -99 SPO 1997 04 24 00 35 78 4.5 -9 665.80 -68.8 -64.4 -69.0 59 -99 SPO 1997 04 24 00 36 77 4.5 -9 665.90 -68.8 -64.5 -69.0 59 -99 SPO 1997 04 24 00 37 76 4.4 -9 665.90 -68.8 -64.5 -69.0 58 -99 SPO 1997 04 24 00 38 78 4.2 -9 665.80 -68.8 -64.5 -69.1 58 -99 SPO 1997 04 24 00 39 80 4.2 -9 665.90 -68.8 -64.3 -69.1 58 -99 SPO 1997 04 24 00 40 79 4.2 -9 665.90 -68.9 -64.2 -69.1 59 -99 SPO 1997 04 24 00 41 79 4.2 -9 665.90 -68.9 -64.0 -69.1 59 -99 SPO 1997 04 24 00 42 80 4.2 -9 665.90 -69.0 -64.0 -69.1 60 -99 SPO 1997 04 24 00 43 80 4.1 -9 665.90 -69.0 -64.0 -69.1 59 -99 SPO 1997 04 24 00 44 84 4.2 -9 665.90 -69.0 -64.0 -69.2 59 -99 SPO 1997 04 24 00 45 85 4.3 -9 665.80 -69.1 -64.0 -69.2 60 -99 SPO 1997 04 24 00 46 82 4.3 -9 665.90 -69.2 -64.1 -69.2 60 -99 SPO 1997 04 24 00 47 80 4.3 -9 665.90 -69.3 -64.2 -69.3 60 -99 SPO 1997 04 24 00 48 81 4.3 -9 665.90 -69.3 -64.2 -69.4 59 -99 SPO 1997 04 24 00 49 84 4.2 -9 666.00 -69.4 -64.2 -69.4 60 -99 SPO 1997 04 24 00 50 88 4.1 -9 666.00 -69.4 -64.3 -69.4 60 -99 SPO 1997 04 24 00 51 90 3.9 -9 666.00 -69.5 -64.4 -69.5 61 -99 SPO 1997 04 24 00 52 86 3.8 -9 666.00 -69.6 -64.4 -69.6 61 -99 SPO 1997 04 24 00 53 86 3.8 -9 666.00 -69.7 -64.6 -69.6 62 -99 SPO 1997 04 24 00 54 89 4.0 -9 665.90 -69.8 -64.6 -69.7 62 -99 SPO 1997 04 24 00 55 89 4.0 -9 665.90 -70.0 -64.6 -69.8 63 -99 SPO 1997 04 24 00 56 88 4.0 -9 665.90 -70.2 -64.4 -69.9 64 -99 SPO 1997 04 24 00 57 87 4.0 -9 665.90 -70.4 -64.4 -70.0 64 -99 SPO 1997 04 24 00 58 83 4.0 -9 665.90 -70.4 -64.5 -70.1 62 -99 SPO 1997 04 24 00 59 86 3.8 -9 666.00 -70.5 -64.7 -70.2 61 -99 SPO 1997 04 24 01 00 87 3.6 -9 666.00 -70.5 -64.8 -70.2 61 0 SPO 1997 04 24 01 01 90 3.7 -9 666.00 -70.6 -64.7 -70.2 62 -99 SPO 1997 04 24 01 02 90 3.6 -9 665.90 -70.6 -64.6 -70.3 62 -99 SPO 1997 04 24 01 03 86 3.6 -9 665.90 -70.6 -64.6 -70.3 62 -99 SPO 1997 04 24 01 04 82 3.6 -9 666.00 -70.7 -64.7 -70.3 62 -99 SPO 1997 04 24 01 05 84 3.8 -9 666.00 -70.7 -64.7 -70.4 61 -99 SPO 1997 04 24 01 06 86 3.8 -9 665.90 -70.8 -64.6 -70.4 61 -99 SPO 1997 04 24 01 07 88 3.8 -9 665.90 -70.8 -64.6 -70.5 60 -99 SPO 1997 04 24 01 08 89 3.8 -9 665.90 -70.8 -64.5 -70.5 59 -99 SPO 1997 04 24 01 09 85 3.6 -9 665.90 -70.8 -64.5 -70.5 57 -99 SPO 1997 04 24 01 10 82 3.6 -9 666.00 -70.8 -64.4 -70.5 57 -99 SPO 1997 04 24 01 11 82 3.6 -9 666.00 -70.8 -64.5 -70.6 57 -99 SPO 1997 04 24 01 12 85 3.7 -9 666.00 -70.8 -64.5 -70.6 56 -99 SPO 1997 04 24 01 13 89 3.7 -9 665.80 -70.7 -64.4 -70.5 55 -99 SPO 1997 04 24 01 14 92 3.8 -9 665.80 -70.6 -64.4 -70.5 55 -99 SPO 1997 04 24 01 15 90 3.7 -9 665.80 -70.6 -64.4 -70.5 56 -99 SPO 1997 04 24 01 16 85 3.8 -9 665.90 -70.6 -64.4 -70.5 56 -99 SPO 1997 04 24 01 17 84 3.9 -9 665.90 -70.7 -64.5 -70.6 57 -99 SPO 1997 04 24 01 18 86 4.0 -9 665.80 -70.7 -64.5 -70.6 57 -99 SPO 1997 04 24 01 19 87 4.0 -9 665.80 -70.7 -64.4 -70.6 56 -99 SPO 1997 04 24 01 20 89 4.0 -9 665.80 -70.6 -64.3 -70.5 55 -99 SPO 1997 04 24 01 21 90 3.9 -9 665.80 -70.4 -64.2 -70.4 54 -99 SPO 1997 04 24 01 22 87 3.9 -9 665.80 -70.4 -64.2 -70.4 54 -99 SPO 1997 04 24 01 23 84 4.0 -9 665.90 -70.3 -64.3 -70.4 53 -99 SPO 1997 04 24 01 24 86 4.2 -9 665.90 -70.3 -64.3 -70.4 53 -99 SPO 1997 04 24 01 25 88 4.2 -9 665.80 -70.2 -64.2 -70.3 52 -99 SPO 1997 04 24 01 26 86 4.2 -9 665.80 -69.9 -64.1 -70.0 51 -99 SPO 1997 04 24 01 27 83 4.2 -9 665.80 -69.6 -64.1 -70.0 50 -99 SPO 1997 04 24 01 28 81 4.2 -9 665.80 -69.6 -64.1 -69.9 52 -99 SPO 1997 04 24 01 29 82 4.3 -9 665.90 -69.6 -64.2 -69.9 53 -99 SPO 1997 04 24 01 30 82 4.3 -9 665.80 -69.6 -64.1 -69.9 53 -99 SPO 1997 04 24 01 31 86 4.2 -9 665.80 -69.6 -64.0 -69.9 53 -99 SPO 1997 04 24 01 32 84 4.3 -9 665.80 -69.4 -63.9 -69.8 52 -99 SPO 1997 04 24 01 33 78 4.4 -9 665.80 -69.4 -64.0 -69.8 53 -99 SPO 1997 04 24 01 34 78 4.5 -9 665.80 -69.4 -64.0 -69.8 53 -99 SPO 1997 04 24 01 35 77 4.6 -9 665.80 -69.2 -63.9 -69.6 52 -99 SPO 1997 04 24 01 36 79 4.6 -9 665.80 -69.0 -63.7 -69.4 52 -99 SPO 1997 04 24 01 37 81 4.6 -9 665.80 -68.6 -63.4 -69.2 52 -99 SPO 1997 04 24 01 38 80 4.6 -9 665.80 -68.4 -63.3 -69.0 52 -99 SPO 1997 04 24 01 39 76 4.7 -9 665.80 -68.2 -63.4 -68.8 52 -99 SPO 1997 04 24 01 40 77 4.6 -9 665.80 -68.1 -63.6 -68.6 53 -99 SPO 1997 04 24 01 41 77 4.5 -9 665.80 -68.1 -63.7 -68.6 54 -99 SPO 1997 04 24 01 42 78 4.4 -9 665.80 -68.1 -63.7 -68.6 55 -99 SPO 1997 04 24 01 43 80 4.3 -9 665.80 -68.1 -63.6 -68.6 55 -99 SPO 1997 04 24 01 44 79 4.3 -9 665.80 -68.1 -63.5 -68.6 55 -99 SPO 1997 04 24 01 45 74 4.3 -9 665.80 -68.2 -63.6 -68.6 56 -99 SPO 1997 04 24 01 46 74 4.2 -9 665.90 -68.3 -63.8 -68.6 58 -99 SPO 1997 04 24 01 47 76 4.1 -9 665.80 -68.3 -63.9 -68.6 59 -99 SPO 1997 04 24 01 48 78 4.0 -9 665.80 -68.3 -63.9 -68.6 59 -99 SPO 1997 04 24 01 49 78 3.9 -9 665.80 -68.4 -63.8 -68.7 59 -99 SPO 1997 04 24 01 50 79 3.8 -9 665.80 -68.5 -63.8 -68.7 59 -99 SPO 1997 04 24 01 51 82 3.7 -9 665.90 -68.5 -63.9 -68.8 59 -99 SPO 1997 04 24 01 52 83 3.6 -9 665.90 -68.6 -64.0 -68.8 61 -99 SPO 1997 04 24 01 53 85 3.5 -9 665.90 -68.6 -64.2 -68.8 61 -99 SPO 1997 04 24 01 54 84 3.4 -9 665.90 -68.6 -64.3 -68.8 60 -99 SPO 1997 04 24 01 55 84 3.4 -9 665.90 -68.6 -64.4 -68.8 60 -99 SPO 1997 04 24 01 56 85 3.5 -9 665.90 -68.7 -64.4 -68.8 60 -99 SPO 1997 04 24 01 57 86 3.6 -9 665.90 -68.6 -64.2 -68.7 58 -99 SPO 1997 04 24 01 58 86 3.8 -9 665.90 -68.6 -64.2 -68.7 59 -99 SPO 1997 04 24 01 59 86 3.8 -9 665.90 -68.6 -64.3 -68.7 59 -99 SPO 1997 04 24 02 00 86 3.7 -9 665.90 -68.5 -64.3 -68.7 59 0 SPO 1997 04 24 02 01 83 3.6 -9 665.90 -68.6 -64.4 -68.7 60 -99 SPO 1997 04 24 02 02 84 3.4 -9 665.90 -68.8 -64.4 -68.8 61 -99 SPO 1997 04 24 02 03 88 3.4 -9 665.90 -68.9 -64.5 -68.9 62 -99 SPO 1997 04 24 02 04 90 3.3 -9 665.90 -68.8 -64.4 -68.9 61 -99 SPO 1997 04 24 02 05 90 3.3 -9 665.90 -68.8 -64.4 -68.9 61 -99 SPO 1997 04 24 02 06 89 3.3 -9 665.90 -68.7 -64.4 -68.8 58 -99 SPO 1997 04 24 02 07 88 3.3 -9 665.90 -68.7 -64.3 -68.8 58 -99 SPO 1997 04 24 02 08 87 3.2 -9 665.90 -68.9 -64.4 -68.9 60 -99 SPO 1997 04 24 02 09 85 3.1 -9 665.90 -68.9 -64.4 -69.0 60 -99 SPO 1997 04 24 02 10 85 3.1 -9 666.00 -68.9 -64.4 -68.9 59 -99 SPO 1997 04 24 02 11 86 3.1 -9 665.90 -68.8 -64.3 -68.9 58 -99 SPO 1997 04 24 02 12 89 3.2 -9 665.90 -68.8 -64.2 -68.9 59 -99 SPO 1997 04 24 02 13 93 3.2 -9 665.90 -68.6 -64.1 -68.8 58 -99 SPO 1997 04 24 02 14 94 3.1 -9 665.90 -68.5 -64.1 -68.7 58 -99 SPO 1997 04 24 02 15 92 3.0 -9 665.90 -68.4 -64.1 -68.7 59 -99 SPO 1997 04 24 02 16 92 2.9 -9 665.90 -68.6 -64.1 -68.7 60 -99 SPO 1997 04 24 02 17 92 3.0 -9 665.90 -68.4 -64.2 -68.7 59 -99 SPO 1997 04 24 02 18 93 3.0 -9 665.90 -68.2 -64.1 -68.6 57 -99 SPO 1997 04 24 02 19 96 3.0 -9 665.90 -68.2 -64.1 -68.4 57 -99 SPO 1997 04 24 02 20 97 3.0 -9 665.90 -68.0 -64.0 -68.4 55 -99 SPO 1997 04 24 02 21 94 3.0 -9 665.90 -68.0 -64.0 -68.2 56 -99 SPO 1997 04 24 02 22 90 3.0 -9 665.90 -68.2 -64.0 -68.2 58 -99 SPO 1997 04 24 02 23 89 3.1 -9 665.90 -68.5 -64.1 -68.4 59 -99 SPO 1997 04 24 02 24 91 3.2 -9 665.90 -68.5 -64.1 -68.4 59 -99 SPO 1997 04 24 02 25 94 3.1 -9 665.90 -68.2 -64.1 -68.2 57 -99 SPO 1997 04 24 02 26 95 3.1 -9 665.90 -68.1 -64.1 -68.1 57 -99 SPO 1997 04 24 02 27 91 3.1 -9 665.90 -68.1 -64.1 -68.0 58 -99 SPO 1997 04 24 02 28 89 3.2 -9 666.00 -68.1 -64.1 -68.0 59 -99 SPO 1997 04 24 02 29 90 3.3 -9 665.90 -68.0 -64.1 -67.9 58 -99 SPO 1997 04 24 02 30 91 3.4 -9 665.90 -67.9 -64.1 -67.8 57 -99 SPO 1997 04 24 02 31 92 3.5 -9 665.90 -67.8 -64.0 -67.7 56 -99 SPO 1997 04 24 02 32 93 3.4 -9 665.90 -67.8 -64.0 -67.7 57 -99 SPO 1997 04 24 02 33 90 3.4 -9 665.80 -68.0 -64.0 -67.8 59 -99 SPO 1997 04 24 02 34 87 3.5 -9 665.80 -68.2 -64.0 -68.1 59 -99 SPO 1997 04 24 02 35 86 3.6 -9 665.80 -68.3 -63.8 -68.2 59 -99 SPO 1997 04 24 02 36 82 3.7 -9 665.80 -68.4 -63.8 -68.2 60 -99 SPO 1997 04 24 02 37 81 3.8 -9 665.80 -68.5 -63.8 -68.3 62 -99 SPO 1997 04 24 02 38 81 3.7 -9 665.80 -68.4 -63.7 -68.4 62 -99 SPO 1997 04 24 02 39 83 3.6 -9 665.80 -68.5 -63.7 -68.4 63 -99 SPO 1997 04 24 02 40 83 3.5 -9 665.80 -68.4 -63.7 -68.4 62 -99 SPO 1997 04 24 02 41 81 3.5 -9 665.80 -68.5 -63.7 -68.4 62 -99 SPO 1997 04 24 02 42 80 3.5 -9 665.80 -68.5 -63.7 -68.4 62 -99 SPO 1997 04 24 02 43 82 3.5 -9 665.80 -68.5 -63.8 -68.4 61 -99 SPO 1997 04 24 02 44 84 3.6 -9 665.80 -68.5 -63.8 -68.4 61 -99 SPO 1997 04 24 02 45 86 3.4 -9 665.80 -68.6 -63.8 -68.5 62 -99 SPO 1997 04 24 02 46 86 3.3 -9 665.80 -68.6 -63.8 -68.5 62 -99 SPO 1997 04 24 02 47 86 3.3 -9 665.80 -68.6 -63.8 -68.6 62 -99 SPO 1997 04 24 02 48 87 3.4 -9 665.80 -68.7 -63.8 -68.6 63 -99 SPO 1997 04 24 02 49 87 3.4 -9 665.90 -68.7 -63.8 -68.6 62 -99 SPO 1997 04 24 02 50 87 3.4 -9 665.90 -68.8 -64.0 -68.6 61 -99 SPO 1997 04 24 02 51 87 3.4 -9 665.90 -68.9 -64.0 -68.7 62 -99 SPO 1997 04 24 02 52 89 3.3 -9 665.90 -68.9 -64.1 -68.7 60 -99 SPO 1997 04 24 02 53 93 3.3 -9 666.00 -68.9 -64.1 -68.7 60 -99 SPO 1997 04 24 02 54 95 3.4 -9 666.00 -69.0 -64.0 -68.7 61 -99 SPO 1997 04 24 02 55 96 3.5 -9 665.90 -68.8 -63.8 -68.6 60 -99 SPO 1997 04 24 02 56 95 3.5 -9 665.90 -68.7 -63.8 -68.6 60 -99 SPO 1997 04 24 02 57 93 3.5 -9 666.00 -68.6 -63.8 -68.6 59 -99 SPO 1997 04 24 02 58 93 3.5 -9 666.00 -68.5 -63.8 -68.5 60 -99 SPO 1997 04 24 02 59 95 3.3 -9 666.00 -68.5 -63.9 -68.6 60 -99 SPO 1997 04 24 03 00 96 3.4 -9 666.10 -68.4 -63.9 -68.5 59 0 SPO 1997 04 24 03 01 95 3.4 -9 666.10 -68.3 -63.8 -68.4 59 -99 SPO 1997 04 24 03 02 95 3.3 -9 666.10 -68.3 -63.8 -68.4 59 -99 SPO 1997 04 24 03 03 95 3.4 -9 666.10 -68.3 -63.8 -68.4 59 -99 SPO 1997 04 24 03 04 95 3.5 -9 666.10 -68.3 -63.8 -68.4 59 -99 SPO 1997 04 24 03 05 94 3.6 -9 666.00 -68.6 -64.0 -68.6 61 -99 SPO 1997 04 24 03 06 95 3.6 -9 666.00 -68.8 -64.0 -68.6 63 -99 SPO 1997 04 24 03 07 97 3.5 -9 666.00 -68.9 -64.1 -68.7 63 -99 SPO 1997 04 24 03 08 100 3.4 -9 666.10 -69.0 -64.1 -68.8 62 -99 SPO 1997 04 24 03 09 102 3.2 -9 666.10 -69.1 -64.1 -68.9 62 -99 SPO 1997 04 24 03 10 103 3.1 -9 666.10 -69.2 -64.2 -69.0 62 -99 SPO 1997 04 24 03 11 106 3.1 -9 666.10 -69.2 -64.3 -69.1 62 -99 SPO 1997 04 24 03 12 112 2.9 -9 666.10 -69.1 -64.3 -69.0 62 -99 SPO 1997 04 24 03 13 113 2.9 -9 666.10 -69.2 -64.2 -69.0 62 -99 SPO 1997 04 24 03 14 113 2.9 -9 666.10 -69.2 -64.1 -69.0 62 -99 SPO 1997 04 24 03 15 112 2.9 -9 666.10 -69.4 -64.2 -69.2 64 -99 SPO 1997 04 24 03 16 112 2.9 -9 666.10 -69.4 -64.2 -69.2 62 -99 SPO 1997 04 24 03 17 113 2.9 -9 666.10 -69.5 -64.4 -69.3 62 -99 SPO 1997 04 24 03 18 112 3.0 -9 666.10 -69.6 -64.4 -69.4 62 -99 SPO 1997 04 24 03 19 108 3.3 -9 666.10 -69.6 -64.3 -69.4 61 -99 SPO 1997 04 24 03 20 106 3.5 -9 666.10 -69.6 -64.3 -69.4 61 -99 SPO 1997 04 24 03 21 107 3.5 -9 666.10 -69.6 -64.3 -69.4 61 -99 SPO 1997 04 24 03 22 111 3.4 -9 666.10 -69.6 -64.3 -69.5 61 -99 SPO 1997 04 24 03 23 113 3.4 -9 666.20 -69.5 -64.3 -69.4 60 -99 SPO 1997 04 24 03 24 112 3.4 -9 666.20 -69.4 -64.4 -69.4 60 -99 SPO 1997 04 24 03 25 110 3.5 -9 666.10 -69.5 -64.4 -69.5 62 -99 SPO 1997 04 24 03 26 107 3.6 -9 666.10 -69.5 -64.3 -69.5 62 -99 SPO 1997 04 24 03 27 106 3.6 -9 666.10 -69.6 -64.2 -69.5 62 -99 SPO 1997 04 24 03 28 106 3.5 -9 666.10 -69.5 -64.1 -69.5 60 -99 SPO 1997 04 24 03 29 105 3.5 -9 666.10 -69.5 -64.1 -69.5 59 -99 SPO 1997 04 24 03 30 106 3.5 -9 666.10 -69.5 -64.1 -69.5 59 -99 SPO 1997 04 24 03 31 106 3.4 -9 666.10 -69.5 -64.1 -69.5 58 -99 SPO 1997 04 24 03 32 106 3.4 -9 666.10 -69.4 -64.0 -69.5 58 -99 SPO 1997 04 24 03 33 104 3.5 -9 666.10 -69.5 -64.0 -69.5 59 -99 SPO 1997 04 24 03 34 104 3.5 -9 666.10 -69.5 -64.0 -69.5 60 -99 SPO 1997 04 24 03 35 104 3.6 -9 666.20 -69.5 -64.0 -69.5 59 -99 SPO 1997 04 24 03 36 104 3.6 -9 666.20 -69.4 -63.9 -69.5 58 -99 SPO 1997 04 24 03 37 102 3.5 -9 666.20 -69.4 -63.8 -69.4 59 -99 SPO 1997 04 24 03 38 101 3.6 -9 666.10 -69.3 -63.8 -69.4 58 -99 SPO 1997 04 24 03 39 101 3.7 -9 666.10 -69.3 -63.9 -69.4 58 -99 SPO 1997 04 24 03 40 100 3.7 -9 666.10 -69.3 -63.8 -69.4 58 -99 SPO 1997 04 24 03 41 98 3.7 -9 666.10 -69.3 -63.8 -69.4 58 -99 SPO 1997 04 24 03 42 95 3.7 -9 666.10 -69.2 -63.6 -69.4 58 -99 SPO 1997 04 24 03 43 93 3.8 -9 666.10 -69.2 -63.5 -69.3 58 -99 SPO 1997 04 24 03 44 93 3.8 -9 666.10 -69.1 -63.4 -69.3 58 -99 SPO 1997 04 24 03 45 96 3.6 -9 666.10 -69.2 -63.3 -69.3 58 -99 SPO 1997 04 24 03 46 96 3.6 -9 666.10 -69.2 -63.4 -69.3 58 -99 SPO 1997 04 24 03 47 95 3.6 -9 666.10 -69.2 -63.5 -69.4 58 -99 SPO 1997 04 24 03 48 95 3.6 -9 666.10 -69.3 -63.5 -69.4 58 -99 SPO 1997 04 24 03 49 95 3.6 -9 666.10 -69.2 -63.6 -69.4 58 -99 SPO 1997 04 24 03 50 98 3.4 -9 666.10 -69.2 -63.5 -69.4 58 -99 SPO 1997 04 24 03 51 100 3.4 -9 666.10 -69.3 -63.5 -69.4 58 -99 SPO 1997 04 24 03 52 100 3.4 -9 666.10 -69.4 -63.6 -69.4 59 -99 SPO 1997 04 24 03 53 100 3.3 -9 666.10 -69.5 -63.6 -69.5 59 -99 SPO 1997 04 24 03 54 99 3.4 -9 666.10 -69.6 -63.7 -69.6 59 -99 SPO 1997 04 24 03 55 100 3.4 -9 666.10 -69.7 -63.6 -69.7 60 -99 SPO 1997 04 24 03 56 101 3.3 -9 666.10 -69.8 -63.6 -69.8 59 -99 SPO 1997 04 24 03 57 101 3.4 -9 666.10 -69.8 -63.6 -69.8 59 -99 SPO 1997 04 24 03 58 98 3.5 -9 666.10 -69.7 -63.5 -69.7 58 -99 SPO 1997 04 24 03 59 95 3.6 -9 666.10 -69.7 -63.4 -69.7 58 -99 SPO 1997 04 24 04 00 93 3.7 -9 666.10 -69.6 -63.3 -69.6 57 0 SPO 1997 04 24 04 01 91 3.7 -9 666.10 -69.6 -63.3 -69.6 57 -99 SPO 1997 04 24 04 02 91 3.7 -9 666.10 -69.6 -63.4 -69.6 58 -99 SPO 1997 04 24 04 03 93 3.7 -9 666.10 -69.7 -63.4 -69.6 58 -99 SPO 1997 04 24 04 04 95 3.7 -9 666.10 -69.7 -63.3 -69.7 58 -99 SPO 1997 04 24 04 05 97 3.6 -9 666.10 -69.8 -63.2 -69.7 58 -99 SPO 1997 04 24 04 06 97 3.6 -9 666.10 -69.8 -63.1 -69.7 57 -99 SPO 1997 04 24 04 07 97 3.5 -9 666.10 -69.8 -63.2 -69.8 57 -99 SPO 1997 04 24 04 08 98 3.4 -9 666.10 -70.0 -63.2 -69.9 59 -99 SPO 1997 04 24 04 09 96 3.5 -9 666.10 -70.1 -63.2 -70.0 59 -99 SPO 1997 04 24 04 10 94 3.6 -9 666.10 -70.0 -63.1 -69.9 57 -99 SPO 1997 04 24 04 11 93 3.5 -9 666.10 -69.9 -63.0 -69.8 57 -99 SPO 1997 04 24 04 12 95 3.5 -9 666.20 -69.8 -63.1 -69.8 57 -99 SPO 1997 04 24 04 13 95 3.4 -9 666.20 -69.9 -63.2 -69.8 58 -99 SPO 1997 04 24 04 14 94 3.5 -9 666.20 -69.9 -63.2 -69.9 58 -99 SPO 1997 04 24 04 15 90 3.5 -9 666.20 -69.8 -63.2 -69.8 57 -99 SPO 1997 04 24 04 16 88 3.5 -9 666.20 -69.7 -63.2 -69.8 57 -99 SPO 1997 04 24 04 17 88 3.6 -9 666.20 -69.7 -63.2 -69.8 57 -99 SPO 1997 04 24 04 18 90 3.6 -9 666.20 -69.6 -63.1 -69.8 56 -99 SPO 1997 04 24 04 19 91 3.6 -9 666.20 -69.6 -63.1 -69.8 56 -99 SPO 1997 04 24 04 20 91 3.6 -9 666.20 -69.6 -63.1 -69.8 57 -99 SPO 1997 04 24 04 21 91 3.6 -9 666.20 -69.6 -63.1 -69.7 56 -99 SPO 1997 04 24 04 22 91 3.6 -9 666.20 -69.6 -63.0 -69.8 57 -99 SPO 1997 04 24 04 23 88 3.6 -9 666.20 -69.6 -62.8 -69.8 58 -99 SPO 1997 04 24 04 24 89 3.7 -9 666.20 -69.5 -62.7 -69.7 58 -99 SPO 1997 04 24 04 25 90 3.7 -9 666.20 -69.4 -62.6 -69.6 57 -99 SPO 1997 04 24 04 26 90 3.8 -9 666.20 -69.3 -62.6 -69.6 57 -99 SPO 1997 04 24 04 27 90 3.8 -9 666.20 -69.3 -62.6 -69.6 57 -99 SPO 1997 04 24 04 28 91 3.9 -9 666.20 -69.4 -62.7 -69.6 58 -99 SPO 1997 04 24 04 29 91 4.0 -9 666.20 -69.4 -62.7 -69.6 58 -99 SPO 1997 04 24 04 30 90 4.1 -9 666.20 -69.5 -62.6 -69.6 58 -99 SPO 1997 04 24 04 31 89 4.2 -9 666.20 -69.5 -62.6 -69.6 58 -99 SPO 1997 04 24 04 32 89 4.1 -9 666.20 -69.6 -62.5 -69.6 58 -99 SPO 1997 04 24 04 33 91 3.9 -9 666.20 -69.6 -62.5 -69.7 58 -99 SPO 1997 04 24 04 34 92 3.8 -9 666.20 -69.5 -62.4 -69.7 58 -99 SPO 1997 04 24 04 35 93 3.7 -9 666.20 -69.4 -62.4 -69.6 58 -99 SPO 1997 04 24 04 36 93 3.7 -9 666.20 -69.5 -62.4 -69.6 60 -99 SPO 1997 04 24 04 37 93 3.6 -9 666.20 -69.5 -62.4 -69.6 60 -99 SPO 1997 04 24 04 38 94 3.6 -9 666.20 -69.5 -62.5 -69.6 60 -99 SPO 1997 04 24 04 39 93 3.7 -9 666.20 -69.6 -62.6 -69.6 60 -99 SPO 1997 04 24 04 40 92 3.8 -9 666.20 -69.6 -62.6 -69.7 59 -99 SPO 1997 04 24 04 41 93 3.7 -9 666.20 -69.6 -62.5 -69.6 58 -99 SPO 1997 04 24 04 42 93 3.6 -9 666.20 -69.4 -62.5 -69.6 56 -99 SPO 1997 04 24 04 43 92 3.6 -9 666.20 -69.4 -62.5 -69.6 56 -99 SPO 1997 04 24 04 44 89 3.5 -9 666.30 -69.4 -62.5 -69.6 58 -99 SPO 1997 04 24 04 45 87 3.5 -9 666.30 -69.4 -62.5 -69.5 58 -99 SPO 1997 04 24 04 46 86 3.6 -9 666.20 -69.4 -62.5 -69.5 58 -99 SPO 1997 04 24 04 47 87 3.7 -9 666.30 -69.4 -62.5 -69.5 58 -99 SPO 1997 04 24 04 48 89 3.7 -9 666.30 -69.3 -62.4 -69.5 58 -99 SPO 1997 04 24 04 49 89 3.6 -9 666.30 -69.3 -62.4 -69.5 58 -99 SPO 1997 04 24 04 50 89 3.6 -9 666.30 -69.2 -62.3 -69.5 58 -99 SPO 1997 04 24 04 51 89 3.7 -9 666.30 -69.2 -62.2 -69.4 58 -99 SPO 1997 04 24 04 52 89 3.7 -9 666.30 -69.3 -62.3 -69.5 58 -99 SPO 1997 04 24 04 53 88 3.7 -9 666.30 -69.3 -62.2 -69.5 58 -99 SPO 1997 04 24 04 54 89 3.7 -9 666.30 -69.3 -62.2 -69.5 58 -99 SPO 1997 04 24 04 55 90 3.7 -9 666.30 -69.3 -62.1 -69.5 57 -99 SPO 1997 04 24 04 56 88 3.6 -9 666.30 -69.4 -62.1 -69.5 58 -99 SPO 1997 04 24 04 57 85 3.6 -9 666.30 -69.5 -62.2 -69.5 58 -99 SPO 1997 04 24 04 58 83 3.8 -9 666.30 -69.5 -62.2 -69.5 58 -99 SPO 1997 04 24 04 59 82 4.0 -9 666.30 -69.4 -62.2 -69.5 58 -99 SPO 1997 04 24 05 00 84 4.0 -9 666.20 -69.2 -62.0 -69.4 57 0 SPO 1997 04 24 05 01 84 4.0 -9 666.20 -69.0 -62.0 -69.2 56 -99 SPO 1997 04 24 05 02 83 4.0 -9 666.20 -68.8 -61.9 -69.2 55 -99 SPO 1997 04 24 05 03 81 4.0 -9 666.30 -68.8 -62.0 -69.1 56 -99 SPO 1997 04 24 05 04 82 4.0 -9 666.30 -68.8 -62.1 -69.0 56 -99 SPO 1997 04 24 05 05 84 3.9 -9 666.30 -68.7 -62.1 -69.0 57 -99 SPO 1997 04 24 05 06 86 3.9 -9 666.30 -68.7 -62.2 -69.0 58 -99 SPO 1997 04 24 05 07 88 3.7 -9 666.30 -68.7 -62.2 -69.1 58 -99 SPO 1997 04 24 05 08 87 3.7 -9 666.30 -68.8 -62.3 -69.1 58 -99 SPO 1997 04 24 05 09 86 3.7 -9 666.30 -68.8 -62.2 -69.1 58 -99 SPO 1997 04 24 05 10 85 3.7 -9 666.30 -68.8 -62.2 -69.1 58 -99 SPO 1997 04 24 05 11 86 3.7 -9 666.30 -68.8 -62.1 -69.1 58 -99 SPO 1997 04 24 05 12 87 3.6 -9 666.30 -68.8 -62.1 -69.1 58 -99 SPO 1997 04 24 05 13 87 3.6 -9 666.30 -68.9 -62.1 -69.1 59 -99 SPO 1997 04 24 05 14 86 3.7 -9 666.30 -68.9 -62.1 -69.1 59 -99 SPO 1997 04 24 05 15 86 3.7 -9 666.30 -69.0 -62.1 -69.1 60 -99 SPO 1997 04 24 05 16 86 3.7 -9 666.30 -68.9 -62.1 -69.1 58 -99 SPO 1997 04 24 05 17 86 3.8 -9 666.30 -68.8 -62.1 -69.1 58 -99 SPO 1997 04 24 05 18 85 3.8 -9 666.30 -68.9 -62.2 -69.1 58 -99 SPO 1997 04 24 05 19 84 3.9 -9 666.30 -68.8 -62.3 -69.0 57 -99 SPO 1997 04 24 05 20 83 4.0 -9 666.30 -68.8 -62.3 -69.0 58 -99 SPO 1997 04 24 05 21 83 4.0 -9 666.30 -68.7 -62.2 -68.9 57 -99 SPO 1997 04 24 05 22 84 4.1 -9 666.30 -68.6 -62.0 -68.9 58 -99 SPO 1997 04 24 05 23 86 4.2 -9 666.30 -68.6 -61.9 -68.8 58 -99 SPO 1997 04 24 05 24 85 4.3 -9 666.20 -68.5 -61.9 -68.8 58 -99 SPO 1997 04 24 05 25 82 4.3 -9 666.20 -68.5 -61.9 -68.8 58 -99 SPO 1997 04 24 05 26 81 4.2 -9 666.20 -68.5 -61.8 -68.7 58 -99 SPO 1997 04 24 05 27 82 4.1 -9 666.30 -68.5 -61.9 -68.7 58 -99 SPO 1997 04 24 05 28 84 3.9 -9 666.30 -68.4 -61.9 -68.7 58 -99 SPO 1997 04 24 05 29 86 3.8 -9 666.30 -68.4 -62.0 -68.7 58 -99 SPO 1997 04 24 05 30 89 3.6 -9 666.30 -68.5 -62.1 -68.7 58 -99 SPO 1997 04 24 05 31 90 3.5 -9 666.40 -68.5 -62.2 -68.8 59 -99 SPO 1997 04 24 05 32 89 3.5 -9 666.40 -68.6 -62.3 -68.8 60 -99 SPO 1997 04 24 05 33 88 3.6 -9 666.40 -68.6 -62.3 -68.8 60 -99 SPO 1997 04 24 05 34 88 3.6 -9 666.30 -68.7 -62.2 -68.8 61 -99 SPO 1997 04 24 05 35 86 3.6 -9 666.30 -68.8 -62.2 -68.9 63 -99 SPO 1997 04 24 05 36 87 3.5 -9 666.30 -69.0 -62.2 -69.0 64 -99 SPO 1997 04 24 05 37 86 3.5 -9 666.40 -69.2 -62.2 -69.1 64 -99 SPO 1997 04 24 05 38 87 3.5 -9 666.40 -69.3 -62.3 -69.1 62 -99 SPO 1997 04 24 05 39 87 3.6 -9 666.40 -69.3 -62.3 -69.1 61 -99 SPO 1997 04 24 05 40 87 3.5 -9 666.40 -69.3 -62.3 -69.2 61 -99 SPO 1997 04 24 05 41 86 3.6 -9 666.30 -69.5 -62.2 -69.2 62 -99 SPO 1997 04 24 05 42 83 3.9 -9 666.30 -69.6 -62.1 -69.3 62 -99 SPO 1997 04 24 05 43 82 4.0 -9 666.40 -69.6 -62.0 -69.3 62 -99 SPO 1997 04 24 05 44 81 4.0 -9 666.40 -69.4 -62.0 -69.3 60 -99 SPO 1997 04 24 05 45 82 3.9 -9 666.40 -69.4 -61.8 -69.2 60 -99 SPO 1997 04 24 05 46 81 4.0 -9 666.40 -69.4 -61.8 -69.2 59 -99 SPO 1997 04 24 05 47 81 3.9 -9 666.40 -69.4 -61.7 -69.3 59 -99 SPO 1997 04 24 05 48 82 3.8 -9 666.40 -69.5 -61.8 -69.4 60 -99 SPO 1997 04 24 05 49 81 3.7 -9 666.40 -69.5 -61.8 -69.4 60 -99 SPO 1997 04 24 05 50 81 3.7 -9 666.40 -69.5 -61.8 -69.4 59 -99 SPO 1997 04 24 05 51 80 3.8 -9 666.40 -69.6 -61.7 -69.4 60 -99 SPO 1997 04 24 05 52 79 4.0 -9 666.40 -69.6 -61.5 -69.4 59 -99 SPO 1997 04 24 05 53 77 4.0 -9 666.40 -69.6 -61.6 -69.4 59 -99 SPO 1997 04 24 05 54 77 4.0 -9 666.40 -69.6 -61.7 -69.5 58 -99 SPO 1997 04 24 05 55 77 4.0 -9 666.40 -69.5 -61.8 -69.4 58 -99 SPO 1997 04 24 05 56 79 3.9 -9 666.40 -69.4 -61.7 -69.4 58 -99 SPO 1997 04 24 05 57 81 3.9 -9 666.40 -69.3 -61.6 -69.4 57 -99 SPO 1997 04 24 05 58 80 3.9 -9 666.40 -69.3 -61.5 -69.4 58 -99 SPO 1997 04 24 05 59 80 4.0 -9 666.40 -69.3 -61.6 -69.4 58 -99 SPO 1997 04 24 06 00 80 4.0 -9 666.40 -69.3 -61.6 -69.4 59 0 SPO 1997 04 24 06 01 83 3.9 -9 666.40 -69.3 -61.6 -69.4 58 -99 SPO 1997 04 24 06 02 85 3.8 -9 666.40 -69.3 -61.6 -69.4 58 -99 SPO 1997 04 24 06 03 88 3.7 -9 666.40 -69.3 -61.6 -69.4 58 -99 SPO 1997 04 24 06 04 87 3.7 -9 666.50 -69.4 -61.7 -69.4 58 -99 SPO 1997 04 24 06 05 87 3.7 -9 666.50 -69.5 -61.8 -69.5 58 -99 SPO 1997 04 24 06 06 87 3.6 -9 666.50 -69.6 -61.8 -69.6 57 -99 SPO 1997 04 24 06 07 87 3.7 -9 666.50 -69.8 -61.9 -69.6 59 -99 SPO 1997 04 24 06 08 87 3.6 -9 666.50 -70.0 -62.0 -69.8 61 -99 SPO 1997 04 24 06 09 88 3.6 -9 666.50 -70.1 -62.1 -69.9 61 -99 SPO 1997 04 24 06 10 89 3.4 -9 666.60 -70.1 -62.2 -69.9 61 -99 SPO 1997 04 24 06 11 90 3.2 -9 666.60 -70.1 -62.3 -69.9 61 -99 SPO 1997 04 24 06 12 91 3.2 -9 666.70 -70.2 -62.4 -69.9 61 -99 SPO 1997 04 24 06 13 92 3.1 -9 666.70 -70.4 -62.4 -70.0 61 -99 SPO 1997 04 24 06 14 92 3.3 -9 666.60 -70.4 -62.3 -70.1 60 -99 SPO 1997 04 24 06 15 90 3.5 -9 666.60 -70.4 -62.3 -70.1 59 -99 SPO 1997 04 24 06 16 89 3.5 -9 666.60 -70.6 -62.2 -70.2 60 -99 SPO 1997 04 24 06 17 88 3.5 -9 666.60 -70.6 -62.2 -70.2 59 -99 SPO 1997 04 24 06 18 87 3.6 -9 666.60 -70.6 -62.1 -70.2 58 -99 SPO 1997 04 24 06 19 86 3.6 -9 666.60 -70.6 -62.0 -70.3 58 -99 SPO 1997 04 24 06 20 86 3.6 -9 666.60 -70.6 -62.0 -70.3 58 -99 SPO 1997 04 24 06 21 84 3.6 -9 666.60 -70.5 -62.0 -70.2 58 -99 SPO 1997 04 24 06 22 84 3.7 -9 666.60 -70.5 -62.0 -70.2 58 -99 SPO 1997 04 24 06 23 84 3.7 -9 666.60 -70.5 -62.0 -70.3 58 -99 SPO 1997 04 24 06 24 83 3.7 -9 666.60 -70.5 -61.9 -70.3 58 -99 SPO 1997 04 24 06 25 82 3.9 -9 666.60 -70.6 -62.0 -70.3 58 -99 SPO 1997 04 24 06 26 82 4.0 -9 666.60 -70.5 -61.7 -70.3 57 -99 SPO 1997 04 24 06 27 81 4.1 -9 666.60 -70.4 -61.5 -70.3 56 -99 SPO 1997 04 24 06 28 81 4.1 -9 666.60 -70.3 -61.5 -70.2 55 -99 SPO 1997 04 24 06 29 82 4.0 -9 666.60 -70.3 -61.6 -70.3 55 -99 SPO 1997 04 24 06 30 82 4.0 -9 666.60 -70.4 -61.6 -70.3 57 -99 SPO 1997 04 24 06 31 82 3.9 -9 666.60 -70.4 -61.8 -70.3 57 -99 SPO 1997 04 24 06 32 82 3.9 -9 666.60 -70.4 -61.8 -70.4 57 -99 SPO 1997 04 24 06 33 82 3.9 -9 666.60 -70.4 -61.8 -70.4 56 -99 SPO 1997 04 24 06 34 82 3.9 -9 666.60 -70.4 -61.8 -70.4 57 -99 SPO 1997 04 24 06 35 81 4.0 -9 666.60 -70.4 -61.9 -70.3 57 -99 SPO 1997 04 24 06 36 81 4.0 -9 666.60 -70.4 -62.0 -70.4 57 -99 SPO 1997 04 24 06 37 81 4.0 -9 666.60 -70.5 -62.0 -70.4 57 -99 SPO 1997 04 24 06 38 81 3.9 -9 666.60 -70.5 -62.0 -70.4 57 -99 SPO 1997 04 24 06 39 80 3.9 -9 666.60 -70.6 -62.0 -70.5 57 -99 SPO 1997 04 24 06 40 80 3.9 -9 666.60 -70.6 -62.0 -70.5 57 -99 SPO 1997 04 24 06 41 81 3.9 -9 666.60 -70.6 -61.9 -70.5 57 -99 SPO 1997 04 24 06 42 81 3.9 -9 666.60 -70.5 -61.8 -70.5 56 -99 SPO 1997 04 24 06 43 82 3.9 -9 666.60 -70.5 -61.9 -70.5 57 -99 SPO 1997 04 24 06 44 82 3.9 -9 666.60 -70.5 -62.0 -70.5 57 -99 SPO 1997 04 24 06 45 83 3.8 -9 666.70 -70.5 -62.0 -70.5 57 -99 SPO 1997 04 24 06 46 83 3.8 -9 666.70 -70.4 -61.9 -70.4 56 -99 SPO 1997 04 24 06 47 82 3.7 -9 666.70 -70.4 -61.9 -70.4 56 -99 SPO 1997 04 24 06 48 81 3.8 -9 666.70 -70.3 -61.9 -70.4 56 -99 SPO 1997 04 24 06 49 80 4.0 -9 666.70 -70.4 -62.0 -70.4 57 -99 SPO 1997 04 24 06 50 80 4.0 -9 666.60 -70.4 -62.0 -70.4 57 -99 SPO 1997 04 24 06 51 80 4.1 -9 666.60 -70.5 -62.0 -70.5 57 -99 SPO 1997 04 24 06 52 81 4.1 -9 666.60 -70.6 -61.9 -70.5 58 -99 SPO 1997 04 24 06 53 81 4.0 -9 666.70 -70.6 -62.0 -70.6 57 -99 SPO 1997 04 24 06 54 82 3.8 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 06 55 84 3.8 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 06 56 85 3.8 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 06 57 85 3.8 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 06 58 86 3.7 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 06 59 85 3.7 -9 666.70 -70.6 -62.2 -70.6 57 -99 SPO 1997 04 24 07 00 85 3.7 -9 666.80 -70.6 -62.2 -70.6 57 0 SPO 1997 04 24 07 01 83 3.7 -9 666.80 -70.6 -62.4 -70.6 57 -99 SPO 1997 04 24 07 02 82 3.6 -9 666.80 -70.5 -62.4 -70.5 56 -99 SPO 1997 04 24 07 03 83 3.6 -9 666.80 -70.5 -62.3 -70.6 56 -99 SPO 1997 04 24 07 04 83 3.5 -9 666.80 -70.5 -62.3 -70.5 56 -99 SPO 1997 04 24 07 05 83 3.6 -9 666.80 -70.6 -62.3 -70.6 57 -99 SPO 1997 04 24 07 06 84 3.5 -9 666.80 -70.8 -62.4 -70.7 57 -99 SPO 1997 04 24 07 07 85 3.5 -9 666.80 -70.9 -62.6 -70.8 57 -99 SPO 1997 04 24 07 08 85 3.5 -9 666.80 -70.7 -62.6 -70.7 57 -99 SPO 1997 04 24 07 09 84 3.4 -9 666.80 -70.6 -62.7 -70.7 56 -99 SPO 1997 04 24 07 10 84 3.4 -9 666.80 -70.7 -62.6 -70.7 57 -99 SPO 1997 04 24 07 11 85 3.4 -9 666.90 -70.6 -62.5 -70.6 56 -99 SPO 1997 04 24 07 12 85 3.4 -9 666.90 -70.6 -62.4 -70.5 55 -99 SPO 1997 04 24 07 13 86 3.5 -9 666.80 -70.5 -62.4 -70.5 54 -99 SPO 1997 04 24 07 14 86 3.5 -9 666.80 -70.5 -62.5 -70.4 54 -99 SPO 1997 04 24 07 15 85 3.6 -9 666.80 -70.4 -62.4 -70.3 53 -99 SPO 1997 04 24 07 16 83 3.6 -9 666.80 -70.3 -62.4 -70.3 54 -99 SPO 1997 04 24 07 17 82 3.5 -9 666.80 -70.4 -62.5 -70.4 54 -99 SPO 1997 04 24 07 18 82 3.5 -9 666.90 -70.6 -62.6 -70.4 56 -99 SPO 1997 04 24 07 19 83 3.5 -9 666.90 -70.6 -62.6 -70.5 56 -99 SPO 1997 04 24 07 20 85 3.3 -9 666.90 -70.5 -62.6 -70.5 55 -99 SPO 1997 04 24 07 21 85 3.4 -9 666.90 -70.4 -62.6 -70.4 54 -99 SPO 1997 04 24 07 22 87 3.4 -9 666.90 -70.3 -62.6 -70.3 54 -99 SPO 1997 04 24 07 23 88 3.3 -9 666.90 -70.2 -62.6 -70.2 54 -99 SPO 1997 04 24 07 24 88 3.4 -9 666.90 -70.1 -62.5 -70.2 53 -99 SPO 1997 04 24 07 25 89 3.4 -9 666.90 -70.1 -62.3 -70.1 53 -99 SPO 1997 04 24 07 26 89 3.4 -9 666.90 -70.1 -62.3 -70.1 54 -99 SPO 1997 04 24 07 27 89 3.4 -9 666.90 -70.1 -62.3 -70.1 54 -99 SPO 1997 04 24 07 28 88 3.5 -9 666.90 -70.0 -62.5 -70.0 53 -99 SPO 1997 04 24 07 29 87 3.5 -9 666.90 -69.9 -62.4 -70.0 52 -99 SPO 1997 04 24 07 30 86 3.5 -9 666.90 -69.8 -62.4 -69.9 52 -99 SPO 1997 04 24 07 31 87 3.5 -9 666.90 -69.9 -62.6 -69.9 54 -99 SPO 1997 04 24 07 32 88 3.4 -9 666.90 -70.0 -62.6 -70.0 55 -99 SPO 1997 04 24 07 33 89 3.4 -9 666.90 -70.0 -62.4 -70.0 56 -99 SPO 1997 04 24 07 34 89 3.4 -9 666.90 -69.9 -62.6 -70.0 56 -99 SPO 1997 04 24 07 35 88 3.4 -9 666.90 -69.9 -62.6 -70.0 55 -99 SPO 1997 04 24 07 36 88 3.5 -9 666.90 -69.9 -62.6 -70.0 55 -99 SPO 1997 04 24 07 37 89 3.5 -9 666.90 -69.9 -62.8 -70.0 54 -99 SPO 1997 04 24 07 38 89 3.5 -9 666.90 -69.9 -62.8 -70.0 55 -99 SPO 1997 04 24 07 39 89 3.5 -9 666.90 -69.9 -62.8 -70.0 55 -99 SPO 1997 04 24 07 40 89 3.4 -9 666.90 -70.0 -62.6 -70.0 56 -99 SPO 1997 04 24 07 41 91 3.3 -9 667.00 -69.9 -62.6 -70.0 55 -99 SPO 1997 04 24 07 42 93 3.2 -9 667.00 -69.8 -62.8 -69.9 54 -99 SPO 1997 04 24 07 43 94 3.2 -9 667.00 -69.9 -63.0 -70.0 57 -99 SPO 1997 04 24 07 44 94 3.2 -9 667.00 -70.1 -63.1 -70.0 59 -99 SPO 1997 04 24 07 45 94 3.2 -9 667.00 -70.1 -63.0 -70.1 59 -99 SPO 1997 04 24 07 46 94 3.1 -9 667.00 -70.0 -63.0 -70.0 58 -99 SPO 1997 04 24 07 47 97 2.9 -9 667.10 -69.6 -62.9 -69.8 54 -99 SPO 1997 04 24 07 48 100 2.8 -9 667.10 -68.4 -62.9 -69.1 48 -99 SPO 1997 04 24 07 49 102 2.7 -9 667.10 -67.6 -62.9 -68.5 47 -99 SPO 1997 04 24 07 50 102 2.6 -9 667.10 -67.2 -62.8 -68.2 48 -99 SPO 1997 04 24 07 51 105 2.6 -9 667.10 -67.0 -62.8 -68.0 49 -99 SPO 1997 04 24 07 52 106 2.6 -9 667.10 -67.0 -62.7 -67.9 52 -99 SPO 1997 04 24 07 53 106 2.6 -9 667.10 -67.3 -62.7 -68.0 55 -99 SPO 1997 04 24 07 54 105 2.7 -9 667.10 -67.0 -62.6 -67.9 54 -99 SPO 1997 04 24 07 55 104 2.7 -9 667.10 -67.0 -62.7 -67.8 56 -99 SPO 1997 04 24 07 56 103 2.7 -9 667.10 -67.6 -62.6 -68.0 59 -99 SPO 1997 04 24 07 57 100 2.8 -9 667.10 -68.2 -62.6 -68.4 63 -99 SPO 1997 04 24 07 58 97 2.9 -9 667.10 -68.6 -62.6 -68.6 64 -99 SPO 1997 04 24 07 59 95 3.0 -9 667.10 -69.0 -62.6 -68.9 64 -99 SPO 1997 04 24 08 00 93 3.1 -9 667.10 -69.1 -62.6 -68.9 63 0 SPO 1997 04 24 08 01 93 3.2 -9 667.10 -69.1 -62.6 -68.9 62 -99 SPO 1997 04 24 08 02 95 3.2 -9 667.10 -69.1 -62.6 -68.9 61 -99 SPO 1997 04 24 08 03 97 3.1 -9 667.10 -69.2 -62.5 -69.0 61 -99 SPO 1997 04 24 08 04 98 3.1 -9 667.10 -69.4 -62.6 -69.1 62 -99 SPO 1997 04 24 08 05 98 3.0 -9 667.10 -69.5 -62.6 -69.2 62 -99 SPO 1997 04 24 08 06 97 2.9 -9 667.10 -69.6 -62.6 -69.3 62 -99 SPO 1997 04 24 08 07 95 2.9 -9 667.10 -69.7 -62.7 -69.4 63 -99 SPO 1997 04 24 08 08 95 2.8 -9 667.20 -69.8 -62.7 -69.5 63 -99 SPO 1997 04 24 08 09 97 2.8 -9 667.10 -69.9 -62.6 -69.5 63 -99 SPO 1997 04 24 08 10 97 2.8 -9 667.10 -69.9 -62.6 -69.6 62 -99 SPO 1997 04 24 08 11 97 2.8 -9 667.10 -69.9 -62.6 -69.6 61 -99 SPO 1997 04 24 08 12 98 2.9 -9 667.20 -69.9 -62.7 -69.6 61 -99 SPO 1997 04 24 08 13 98 2.9 -9 667.10 -69.8 -62.7 -69.6 60 -99 SPO 1997 04 24 08 14 98 3.0 -9 667.10 -69.6 -62.8 -69.5 58 -99 SPO 1997 04 24 08 15 98 3.0 -9 667.10 -69.5 -62.8 -69.4 58 -99 SPO 1997 04 24 08 16 98 3.0 -9 667.10 -69.4 -62.8 -69.3 58 -99 SPO 1997 04 24 08 17 98 3.0 -9 667.10 -69.4 -62.7 -69.3 58 -99 SPO 1997 04 24 08 18 98 3.0 -9 667.20 -69.5 -62.7 -69.4 59 -99 SPO 1997 04 24 08 19 96 3.0 -9 667.10 -69.6 -62.7 -69.5 60 -99 SPO 1997 04 24 08 20 94 3.1 -9 667.20 -69.6 -62.6 -69.5 60 -99 SPO 1997 04 24 08 21 94 3.1 -9 667.10 -69.7 -62.4 -69.5 61 -99 SPO 1997 04 24 08 22 93 3.2 -9 667.10 -69.7 -62.2 -69.5 61 -99 SPO 1997 04 24 08 23 91 3.2 -9 667.10 -69.7 -62.1 -69.5 59 -99 SPO 1997 04 24 08 24 89 3.3 -9 667.10 -69.7 -62.0 -69.5 58 -99 SPO 1997 04 24 08 25 89 3.3 -9 667.10 -69.8 -62.1 -69.5 58 -99 SPO 1997 04 24 08 26 89 3.3 -9 667.10 -69.8 -62.1 -69.6 58 -99 SPO 1997 04 24 08 27 91 3.2 -9 667.10 -69.8 -62.2 -69.6 58 -99 SPO 1997 04 24 08 28 92 3.1 -9 667.20 -69.6 -62.2 -69.6 56 -99 SPO 1997 04 24 08 29 91 3.1 -9 667.20 -69.6 -62.2 -69.5 57 -99 SPO 1997 04 24 08 30 89 3.1 -9 667.20 -69.4 -62.1 -69.4 56 -99 SPO 1997 04 24 08 31 88 3.1 -9 667.20 -69.5 -62.2 -69.4 58 -99 SPO 1997 04 24 08 32 89 3.0 -9 667.20 -69.5 -62.2 -69.4 58 -99 SPO 1997 04 24 08 33 93 3.0 -9 667.20 -69.4 -62.2 -69.4 57 -99 SPO 1997 04 24 08 34 96 3.0 -9 667.20 -69.1 -62.2 -69.2 55 -99 SPO 1997 04 24 08 35 95 3.0 -9 667.20 -68.8 -62.2 -69.0 54 -99 SPO 1997 04 24 08 36 94 3.1 -9 667.20 -68.9 -62.3 -68.9 56 -99 SPO 1997 04 24 08 37 92 3.1 -9 667.20 -69.1 -62.4 -69.0 58 -99 SPO 1997 04 24 08 38 91 3.1 -9 667.20 -69.2 -62.4 -69.1 58 -99 SPO 1997 04 24 08 39 91 3.2 -9 667.20 -69.3 -62.4 -69.2 57 -99 SPO 1997 04 24 08 40 91 3.2 -9 667.20 -69.4 -62.4 -69.2 57 -99 SPO 1997 04 24 08 41 92 3.1 -9 667.20 -69.2 -62.2 -69.2 56 -99 SPO 1997 04 24 08 42 93 3.1 -9 667.20 -69.2 -62.1 -69.2 56 -99 SPO 1997 04 24 08 43 91 3.3 -9 667.20 -69.2 -62.2 -69.1 57 -99 SPO 1997 04 24 08 44 90 3.3 -9 667.20 -69.1 -61.8 -69.1 56 -99 SPO 1997 04 24 08 45 91 3.2 -9 667.20 -69.4 -62.0 -69.2 59 -99 SPO 1997 04 24 08 46 91 3.1 -9 667.30 -69.5 -62.0 -69.4 60 -99 SPO 1997 04 24 08 47 92 3.0 -9 667.30 -69.6 -62.3 -69.4 60 -99 SPO 1997 04 24 08 48 93 3.0 -9 667.40 -69.4 -62.3 -69.3 58 -99 SPO 1997 04 24 08 49 96 2.9 -9 667.40 -69.3 -62.2 -69.3 58 -99 SPO 1997 04 24 08 50 98 2.9 -9 667.40 -69.0 -62.0 -69.1 56 -99 SPO 1997 04 24 08 51 97 3.0 -9 667.40 -68.8 -62.1 -69.0 55 -99 SPO 1997 04 24 08 52 93 3.1 -9 667.30 -68.9 -62.2 -68.9 57 -99 SPO 1997 04 24 08 53 90 3.1 -9 667.30 -69.2 -62.1 -69.1 59 -99 SPO 1997 04 24 08 54 89 3.0 -9 667.40 -69.4 -62.0 -69.2 61 -99 SPO 1997 04 24 08 55 90 3.0 -9 667.40 -69.5 -62.0 -69.3 61 -99 SPO 1997 04 24 08 56 90 2.9 -9 667.40 -69.4 -62.1 -69.4 60 -99 SPO 1997 04 24 08 57 92 2.8 -9 667.40 -69.4 -62.3 -69.4 59 -99 SPO 1997 04 24 08 58 94 2.9 -9 667.40 -69.6 -62.4 -69.4 60 -99 SPO 1997 04 24 08 59 92 2.9 -9 667.40 -69.6 -62.4 -69.4 60 -99 SPO 1997 04 24 09 00 91 2.9 -9 667.40 -69.4 -62.4 -69.4 58 0 SPO 1997 04 24 09 01 91 2.7 -9 667.40 -69.4 -62.4 -69.4 58 -99 SPO 1997 04 24 09 02 90 2.7 -9 667.50 -69.3 -62.5 -69.3 57 -99 SPO 1997 04 24 09 03 89 2.7 -9 667.50 -69.1 -62.5 -69.2 56 -99 SPO 1997 04 24 09 04 88 2.8 -9 667.50 -69.0 -62.5 -69.0 56 -99 SPO 1997 04 24 09 05 86 3.0 -9 667.40 -69.2 -62.5 -69.0 58 -99 SPO 1997 04 24 09 06 87 3.1 -9 667.40 -69.0 -62.4 -68.9 56 -99 SPO 1997 04 24 09 07 89 3.0 -9 667.40 -68.9 -62.3 -68.7 56 -99 SPO 1997 04 24 09 08 89 3.0 -9 667.40 -69.0 -62.4 -68.7 58 -99 SPO 1997 04 24 09 09 88 3.0 -9 667.40 -69.1 -62.5 -68.8 58 -99 SPO 1997 04 24 09 10 86 3.2 -9 667.40 -69.1 -62.4 -68.8 58 -99 SPO 1997 04 24 09 11 85 3.2 -9 667.40 -69.1 -62.4 -68.8 58 -99 SPO 1997 04 24 09 12 86 3.2 -9 667.40 -69.2 -62.2 -69.0 58 -99 SPO 1997 04 24 09 13 87 3.2 -9 667.40 -69.3 -62.2 -69.1 59 -99 SPO 1997 04 24 09 14 87 3.1 -9 667.50 -69.4 -62.2 -69.2 59 -99 SPO 1997 04 24 09 15 87 3.0 -9 667.50 -69.6 -62.3 -69.3 60 -99 SPO 1997 04 24 09 16 88 3.0 -9 667.50 -69.7 -62.3 -69.4 60 -99 SPO 1997 04 24 09 17 90 3.0 -9 667.50 -69.6 -62.3 -69.3 59 -99 SPO 1997 04 24 09 18 93 3.0 -9 667.50 -69.2 -62.2 -69.1 57 -99 SPO 1997 04 24 09 19 95 2.9 -9 667.50 -68.8 -62.2 -68.8 55 -99 SPO 1997 04 24 09 20 95 2.9 -9 667.50 -68.5 -62.2 -68.6 54 -99 SPO 1997 04 24 09 21 95 2.7 -9 667.60 -68.2 -62.3 -68.6 53 -99 SPO 1997 04 24 09 22 95 2.6 -9 667.60 -67.8 -62.4 -68.4 52 -99 SPO 1997 04 24 09 23 94 2.7 -9 667.60 -67.8 -62.4 -68.3 54 -99 SPO 1997 04 24 09 24 94 2.8 -9 667.60 -68.3 -62.4 -68.4 59 -99 SPO 1997 04 24 09 25 94 2.9 -9 667.50 -68.7 -62.4 -68.4 61 -99 SPO 1997 04 24 09 26 93 2.9 -9 667.50 -69.0 -62.4 -68.5 62 -99 SPO 1997 04 24 09 27 91 3.0 -9 667.50 -69.0 -62.4 -68.5 60 -99 SPO 1997 04 24 09 28 90 3.0 -9 667.50 -69.3 -62.3 -68.6 62 -99 SPO 1997 04 24 09 29 90 2.9 -9 667.60 -69.4 -62.2 -68.8 62 -99 SPO 1997 04 24 09 30 91 2.9 -9 667.60 -69.6 -62.2 -69.0 62 -99 SPO 1997 04 24 09 31 91 2.9 -9 667.60 -69.6 -62.2 -69.0 62 -99 SPO 1997 04 24 09 32 93 2.9 -9 667.60 -69.6 -62.2 -69.0 62 -99 SPO 1997 04 24 09 33 94 2.8 -9 667.60 -69.4 -62.2 -68.9 59 -99 SPO 1997 04 24 09 34 94 2.9 -9 667.60 -69.4 -62.2 -68.8 58 -99 SPO 1997 04 24 09 35 92 3.0 -9 667.60 -69.6 -62.2 -68.9 59 -99 SPO 1997 04 24 09 36 90 3.1 -9 667.60 -69.8 -62.2 -69.0 62 -99 SPO 1997 04 24 09 37 88 3.2 -9 667.50 -69.9 -62.0 -69.2 62 -99 SPO 1997 04 24 09 38 86 3.2 -9 667.50 -69.9 -61.7 -69.3 60 -99 SPO 1997 04 24 09 39 87 3.2 -9 667.50 -70.0 -61.6 -69.4 60 -99 SPO 1997 04 24 09 40 88 3.1 -9 667.50 -70.1 -61.4 -69.5 60 -99 SPO 1997 04 24 09 41 87 3.0 -9 667.60 -70.2 -61.2 -69.6 61 -99 SPO 1997 04 24 09 42 86 3.0 -9 667.60 -70.2 -61.4 -69.6 60 -99 SPO 1997 04 24 09 43 87 2.9 -9 667.60 -70.3 -61.9 -69.7 60 -99 SPO 1997 04 24 09 44 88 2.8 -9 667.60 -70.2 -62.0 -69.7 59 -99 SPO 1997 04 24 09 45 90 2.8 -9 667.60 -70.2 -62.0 -69.8 58 -99 SPO 1997 04 24 09 46 89 2.8 -9 667.60 -70.2 -61.7 -69.8 57 -99 SPO 1997 04 24 09 47 89 2.8 -9 667.60 -70.3 -61.6 -69.8 59 -99 SPO 1997 04 24 09 48 89 2.8 -9 667.60 -70.5 -61.6 -70.0 59 -99 SPO 1997 04 24 09 49 87 2.9 -9 667.60 -70.6 -61.6 -70.0 59 -99 SPO 1997 04 24 09 50 86 2.9 -9 667.60 -70.8 -61.7 -70.2 61 -99 SPO 1997 04 24 09 51 86 3.0 -9 667.60 -70.8 -61.8 -70.2 61 -99 SPO 1997 04 24 09 52 88 2.9 -9 667.60 -70.8 -61.8 -70.3 61 -99 SPO 1997 04 24 09 53 89 2.8 -9 667.60 -71.0 -61.8 -70.4 62 -99 SPO 1997 04 24 09 54 92 2.6 -9 667.60 -71.0 -61.9 -70.4 61 -99 SPO 1997 04 24 09 55 95 2.5 -9 667.70 -70.7 -61.9 -70.3 59 -99 SPO 1997 04 24 09 56 97 2.4 -9 667.70 -69.9 -62.0 -69.8 53 -99 SPO 1997 04 24 09 57 99 2.4 -9 667.70 -69.1 -62.1 -69.4 50 -99 SPO 1997 04 24 09 58 97 2.6 -9 667.60 -69.0 -62.2 -69.2 51 -99 SPO 1997 04 24 09 59 96 2.6 -9 667.60 -69.6 -62.2 -69.6 56 -99 SPO 1997 04 24 10 00 95 2.7 -9 667.60 -70.1 -62.0 -69.8 60 0 SPO 1997 04 24 10 01 93 2.8 -9 667.60 -70.3 -61.8 -69.9 60 -99 SPO 1997 04 24 10 02 89 3.0 -9 667.60 -70.4 -61.4 -70.0 59 -99 SPO 1997 04 24 10 03 88 3.1 -9 667.50 -70.5 -61.2 -70.1 58 -99 SPO 1997 04 24 10 04 86 3.1 -9 667.50 -70.5 -61.2 -70.1 58 -99 SPO 1997 04 24 10 05 86 3.2 -9 667.50 -70.6 -61.4 -70.2 59 -99 SPO 1997 04 24 10 06 83 3.4 -9 667.50 -70.6 -61.1 -70.2 59 -99 SPO 1997 04 24 10 07 82 3.4 -9 667.50 -70.6 -61.0 -70.2 59 -99 SPO 1997 04 24 10 08 81 3.5 -9 667.50 -70.6 -60.8 -70.2 59 -99 SPO 1997 04 24 10 09 80 3.6 -9 667.50 -70.5 -60.6 -70.2 57 -99 SPO 1997 04 24 10 10 80 3.6 -9 667.50 -70.6 -60.7 -70.3 58 -99 SPO 1997 04 24 10 11 80 3.6 -9 667.60 -70.5 -60.8 -70.3 57 -99 SPO 1997 04 24 10 12 81 3.5 -9 667.50 -70.4 -60.8 -70.3 56 -99 SPO 1997 04 24 10 13 82 3.5 -9 667.50 -70.4 -60.7 -70.3 55 -99 SPO 1997 04 24 10 14 82 3.5 -9 667.50 -70.4 -60.7 -70.3 55 -99 SPO 1997 04 24 10 15 82 3.6 -9 667.50 -70.4 -60.6 -70.3 55 -99 SPO 1997 04 24 10 16 80 3.7 -9 667.50 -70.4 -60.7 -70.3 56 -99 SPO 1997 04 24 10 17 81 3.7 -9 667.50 -70.5 -60.8 -70.3 57 -99 SPO 1997 04 24 10 18 82 3.7 -9 667.50 -70.6 -61.0 -70.4 57 -99 SPO 1997 04 24 10 19 82 3.8 -9 667.50 -70.6 -61.2 -70.4 57 -99 SPO 1997 04 24 10 20 82 3.9 -9 667.40 -70.6 -61.2 -70.4 57 -99 SPO 1997 04 24 10 21 81 4.0 -9 667.40 -70.6 -61.2 -70.4 57 -99 SPO 1997 04 24 10 22 80 4.0 -9 667.40 -70.6 -61.4 -70.4 57 -99 SPO 1997 04 24 10 23 78 4.0 -9 667.50 -70.6 -61.5 -70.5 57 -99 SPO 1997 04 24 10 24 77 3.9 -9 667.50 -70.6 -61.6 -70.5 56 -99 SPO 1997 04 24 10 25 77 3.9 -9 667.50 -70.6 -61.6 -70.5 56 -99 SPO 1997 04 24 10 26 76 4.0 -9 667.50 -70.6 -61.4 -70.5 56 -99 SPO 1997 04 24 10 27 76 3.9 -9 667.50 -70.5 -61.3 -70.5 56 -99 SPO 1997 04 24 10 28 77 3.8 -9 667.50 -70.5 -61.1 -70.4 56 -99 SPO 1997 04 24 10 29 77 3.7 -9 667.50 -70.4 -61.0 -70.4 55 -99 SPO 1997 04 24 10 30 77 3.8 -9 667.50 -70.3 -60.8 -70.4 55 -99 SPO 1997 04 24 10 31 76 3.8 -9 667.50 -70.2 -60.8 -70.3 55 -99 SPO 1997 04 24 10 32 76 3.8 -9 667.60 -70.1 -60.9 -70.2 55 -99 SPO 1997 04 24 10 33 75 3.6 -9 667.60 -70.1 -61.0 -70.2 55 -99 SPO 1997 04 24 10 34 76 3.6 -9 667.60 -70.0 -61.1 -70.2 54 -99 SPO 1997 04 24 10 35 77 3.5 -9 667.70 -70.0 -61.2 -70.2 54 -99 SPO 1997 04 24 10 36 77 3.5 -9 667.70 -69.8 -61.2 -70.2 54 -99 SPO 1997 04 24 10 37 78 3.5 -9 667.70 -69.8 -61.3 -70.1 54 -99 SPO 1997 04 24 10 38 79 3.5 -9 667.70 -69.7 -61.3 -70.1 54 -99 SPO 1997 04 24 10 39 79 3.6 -9 667.70 -69.8 -61.4 -70.1 56 -99 SPO 1997 04 24 10 40 79 3.7 -9 667.70 -69.8 -61.4 -70.0 57 -99 SPO 1997 04 24 10 41 77 3.8 -9 667.70 -69.8 -61.4 -70.0 57 -99 SPO 1997 04 24 10 42 76 3.9 -9 667.70 -69.6 -61.3 -69.8 56 -99 SPO 1997 04 24 10 43 76 3.9 -9 667.70 -69.6 -61.3 -69.8 57 -99 SPO 1997 04 24 10 44 77 3.9 -9 667.70 -69.9 -61.2 -69.8 58 -99 SPO 1997 04 24 10 45 77 4.0 -9 667.70 -69.9 -61.2 -69.8 57 -99 SPO 1997 04 24 10 46 78 3.9 -9 667.70 -69.9 -61.2 -69.8 57 -99 SPO 1997 04 24 10 47 78 3.9 -9 667.70 -69.9 -61.3 -69.9 57 -99 SPO 1997 04 24 10 48 80 3.7 -9 667.80 -69.8 -61.4 -69.9 56 -99 SPO 1997 04 24 10 49 81 3.6 -9 667.80 -69.6 -61.4 -69.8 55 -99 SPO 1997 04 24 10 50 81 3.6 -9 667.80 -69.4 -61.4 -69.7 54 -99 SPO 1997 04 24 10 51 82 3.5 -9 667.80 -69.3 -61.6 -69.6 55 -99 SPO 1997 04 24 10 52 82 3.5 -9 667.80 -69.2 -61.9 -69.5 55 -99 SPO 1997 04 24 10 53 80 3.6 -9 667.80 -69.2 -62.0 -69.5 56 -99 SPO 1997 04 24 10 54 81 3.4 -9 667.80 -69.1 -62.0 -69.4 56 -99 SPO 1997 04 24 10 55 84 3.4 -9 667.80 -69.0 -61.8 -69.4 56 -99 SPO 1997 04 24 10 56 85 3.2 -9 667.90 -69.0 -61.6 -69.4 56 -99 SPO 1997 04 24 10 57 85 3.2 -9 667.90 -69.0 -61.7 -69.4 56 -99 SPO 1997 04 24 10 58 85 3.2 -9 667.90 -69.1 -61.8 -69.4 56 -99 SPO 1997 04 24 10 59 83 3.2 -9 667.90 -69.2 -62.0 -69.4 57 -99 SPO 1997 04 24 11 00 82 3.2 -9 668.00 -69.2 -62.2 -69.4 58 0 SPO 1997 04 24 11 01 84 3.0 -9 668.00 -69.2 -62.2 -69.5 58 -99 SPO 1997 04 24 11 02 89 2.9 -9 668.00 -69.2 -62.3 -69.5 58 -99 SPO 1997 04 24 11 03 92 2.9 -9 668.00 -69.4 -62.4 -69.5 60 -99 SPO 1997 04 24 11 04 95 2.7 -9 668.00 -69.5 -62.4 -69.6 60 -99 SPO 1997 04 24 11 05 96 2.7 -9 668.00 -69.5 -62.4 -69.6 60 -99 SPO 1997 04 24 11 06 97 2.6 -9 668.10 -69.4 -62.5 -69.5 58 -99 SPO 1997 04 24 11 07 101 2.3 -9 668.10 -69.2 -62.6 -69.4 58 -99 SPO 1997 04 24 11 08 103 2.3 -9 668.20 -69.3 -62.6 -69.5 58 -99 SPO 1997 04 24 11 09 104 2.3 -9 668.20 -69.2 -62.6 -69.4 58 -99 SPO 1997 04 24 11 10 105 2.3 -9 668.20 -69.2 -62.6 -69.4 58 -99 SPO 1997 04 24 11 11 110 2.2 -9 668.20 -69.3 -62.7 -69.5 59 -99 SPO 1997 04 24 11 12 109 2.3 -9 668.20 -69.2 -62.8 -69.4 58 -99 SPO 1997 04 24 11 13 105 2.4 -9 668.20 -69.1 -62.6 -69.4 58 -99 SPO 1997 04 24 11 14 102 2.6 -9 668.20 -69.0 -62.2 -69.4 58 -99 SPO 1997 04 24 11 15 98 2.6 -9 668.20 -68.9 -61.8 -69.3 58 -99 SPO 1997 04 24 11 16 95 2.8 -9 668.10 -68.9 -61.4 -69.2 58 -99 SPO 1997 04 24 11 17 93 2.7 -9 668.20 -69.0 -61.3 -69.1 60 -99 SPO 1997 04 24 11 18 93 2.6 -9 668.20 -69.2 -61.2 -69.2 61 -99 SPO 1997 04 24 11 19 92 2.6 -9 668.20 -69.4 -60.8 -69.2 62 -99 SPO 1997 04 24 11 20 91 2.7 -9 668.10 -69.3 -60.5 -69.2 60 -99 SPO 1997 04 24 11 21 93 2.6 -9 668.20 -69.3 -60.2 -69.1 59 -99 SPO 1997 04 24 11 22 93 2.7 -9 668.20 -69.2 -60.0 -69.0 59 -99 SPO 1997 04 24 11 23 93 2.7 -9 668.20 -69.2 -59.8 -69.0 58 -99 SPO 1997 04 24 11 24 95 2.6 -9 668.20 -69.1 -60.1 -68.9 58 -99 SPO 1997 04 24 11 25 96 2.6 -9 668.20 -69.3 -60.4 -69.0 59 -99 SPO 1997 04 24 11 26 93 2.6 -9 668.20 -69.3 -60.2 -69.1 58 -99 SPO 1997 04 24 11 27 92 2.6 -9 668.20 -69.6 -60.2 -69.2 61 -99 SPO 1997 04 24 11 28 94 2.5 -9 668.20 -69.8 -60.3 -69.4 62 -99 SPO 1997 04 24 11 29 93 2.5 -9 668.20 -70.2 -60.4 -69.7 64 -99 SPO 1997 04 24 11 30 91 2.5 -9 668.20 -70.4 -60.7 -69.9 64 -99 SPO 1997 04 24 11 31 91 2.5 -9 668.20 -70.7 -60.3 -70.0 66 -99 SPO 1997 04 24 11 32 91 2.6 -9 668.20 -70.8 -59.9 -70.2 65 -99 SPO 1997 04 24 11 33 91 2.6 -9 668.20 -70.9 -59.9 -70.2 63 -99 SPO 1997 04 24 11 34 90 2.6 -9 668.20 -70.9 -60.0 -70.3 62 -99 SPO 1997 04 24 11 35 90 2.7 -9 668.20 -71.0 -60.1 -70.4 62 -99 SPO 1997 04 24 11 36 92 2.5 -9 668.20 -71.0 -60.2 -70.4 61 -99 SPO 1997 04 24 11 37 94 2.3 -9 668.20 -70.9 -60.2 -70.4 60 -99 SPO 1997 04 24 11 38 97 2.2 -9 668.30 -70.9 -60.4 -70.4 59 -99 SPO 1997 04 24 11 39 100 2.0 -9 668.30 -70.4 -60.5 -70.1 56 -99 SPO 1997 04 24 11 40 104 2.0 -9 668.30 -69.4 -60.6 -69.6 50 -99 SPO 1997 04 24 11 41 112 1.9 -9 668.30 -69.1 -60.8 -69.4 51 -99 SPO 1997 04 24 11 42 117 1.8 -9 668.40 -69.0 -60.8 -69.4 53 -99 SPO 1997 04 24 11 43 120 1.9 -9 668.40 -69.5 -61.1 -69.5 58 -99 SPO 1997 04 24 11 44 116 1.9 -9 668.40 -69.6 -61.2 -69.6 57 -99 SPO 1997 04 24 11 45 107 2.1 -9 668.40 -69.0 -60.8 -69.4 53 -99 SPO 1997 04 24 11 46 103 2.1 -9 668.40 -68.5 -60.2 -69.0 51 -99 SPO 1997 04 24 11 47 103 2.2 -9 668.40 -68.6 -60.0 -68.8 52 -99 SPO 1997 04 24 11 48 103 2.3 -9 668.40 -68.8 -59.6 -69.0 55 -99 SPO 1997 04 24 11 49 100 2.5 -9 668.40 -69.5 -59.4 -69.4 60 -99 SPO 1997 04 24 11 50 98 2.6 -9 668.40 -70.0 -59.3 -69.8 62 -99 SPO 1997 04 24 11 51 98 2.8 -9 668.30 -70.2 -59.0 -70.0 63 -99 SPO 1997 04 24 11 52 98 2.8 -9 668.30 -70.4 -58.8 -70.1 64 -99 SPO 1997 04 24 11 53 97 2.9 -9 668.30 -70.4 -58.6 -70.1 62 -99 SPO 1997 04 24 11 54 95 3.0 -9 668.20 -70.4 -58.5 -70.1 61 -99 SPO 1997 04 24 11 55 91 3.0 -9 668.30 -70.4 -58.5 -70.2 61 -99 SPO 1997 04 24 11 56 91 3.0 -9 668.20 -70.4 -58.4 -70.1 61 -99 SPO 1997 04 24 11 57 92 3.0 -9 668.20 -70.3 -58.3 -70.1 60 -99 SPO 1997 04 24 11 58 92 3.0 -9 668.20 -70.3 -58.5 -70.1 60 -99 SPO 1997 04 24 11 59 92 3.0 -9 668.20 -70.2 -58.8 -70.1 58 -99 SPO 1997 04 24 12 00 93 3.0 -9 668.20 -70.2 -58.9 -70.1 58 0 SPO 1997 04 24 12 01 93 2.9 -9 668.30 -70.2 -59.4 -70.1 58 -99 SPO 1997 04 24 12 02 93 2.8 -9 668.30 -70.2 -59.9 -70.2 58 -99 SPO 1997 04 24 12 03 94 2.8 -9 668.30 -70.3 -60.4 -70.2 59 -99 SPO 1997 04 24 12 04 97 2.7 -9 668.30 -70.3 -61.2 -70.2 59 -99 SPO 1997 04 24 12 05 100 2.6 -9 668.30 -70.3 -61.6 -70.3 60 -99 SPO 1997 04 24 12 06 100 2.5 -9 668.40 -70.2 -62.1 -70.2 60 -99 SPO 1997 04 24 12 07 94 2.5 -9 668.40 -70.2 -62.3 -70.2 60 -99 SPO 1997 04 24 12 08 91 2.6 -9 668.30 -70.3 -62.1 -70.3 60 -99 SPO 1997 04 24 12 09 91 2.6 -9 668.30 -70.4 -61.9 -70.3 61 -99 SPO 1997 04 24 12 10 90 2.6 -9 668.40 -70.5 -62.0 -70.4 61 -99 SPO 1997 04 24 12 11 87 2.8 -9 668.40 -70.5 -62.0 -70.4 60 -99 SPO 1997 04 24 12 12 86 2.8 -9 668.40 -70.5 -61.6 -70.4 60 -99 SPO 1997 04 24 12 13 84 3.0 -9 668.40 -70.6 -61.6 -70.4 60 -99 SPO 1997 04 24 12 14 84 3.0 -9 668.40 -70.7 -61.4 -70.4 61 -99 SPO 1997 04 24 12 15 85 3.0 -9 668.40 -70.7 -60.9 -70.4 61 -99 SPO 1997 04 24 12 16 87 3.1 -9 668.40 -70.7 -60.7 -70.4 61 -99 SPO 1997 04 24 12 17 86 3.1 -9 668.40 -70.5 -60.6 -70.3 59 -99 SPO 1997 04 24 12 18 83 3.3 -9 668.40 -70.3 -60.8 -70.2 58 -99 SPO 1997 04 24 12 19 82 3.3 -9 668.40 -70.4 -61.1 -70.2 59 -99 SPO 1997 04 24 12 20 82 3.4 -9 668.40 -70.4 -61.1 -70.3 59 -99 SPO 1997 04 24 12 21 83 3.5 -9 668.40 -70.5 -60.9 -70.3 58 -99 SPO 1997 04 24 12 22 84 3.4 -9 668.30 -70.4 -60.7 -70.2 57 -99 SPO 1997 04 24 12 23 86 3.3 -9 668.30 -70.2 -60.6 -70.2 57 -99 SPO 1997 04 24 12 24 87 3.1 -9 668.30 -70.1 -60.9 -70.1 57 -99 SPO 1997 04 24 12 25 86 3.0 -9 668.40 -69.8 -61.2 -70.1 56 -99 SPO 1997 04 24 12 26 85 3.1 -9 668.40 -69.6 -61.5 -70.0 55 -99 SPO 1997 04 24 12 27 84 3.2 -9 668.40 -69.5 -61.4 -69.9 56 -99 SPO 1997 04 24 12 28 84 3.1 -9 668.40 -69.5 -61.6 -69.8 57 -99 SPO 1997 04 24 12 29 84 3.2 -9 668.40 -69.5 -61.8 -69.8 58 -99 SPO 1997 04 24 12 30 85 3.3 -9 668.40 -69.5 -61.8 -69.8 58 -99 SPO 1997 04 24 12 31 86 3.4 -9 668.40 -69.5 -61.8 -69.8 58 -99 SPO 1997 04 24 12 32 87 3.3 -9 668.40 -69.6 -61.8 -69.8 58 -99 SPO 1997 04 24 12 33 88 3.2 -9 668.40 -69.7 -62.1 -69.8 59 -99 SPO 1997 04 24 12 34 88 3.2 -9 668.40 -69.6 -62.2 -69.8 58 -99 SPO 1997 04 24 12 35 87 3.2 -9 668.50 -69.5 -62.2 -69.7 58 -99 SPO 1997 04 24 12 36 87 3.3 -9 668.50 -69.4 -62.2 -69.7 57 -99 SPO 1997 04 24 12 37 87 3.3 -9 668.40 -69.4 -62.3 -69.7 58 -99 SPO 1997 04 24 12 38 88 3.3 -9 668.40 -69.4 -62.4 -69.7 59 -99 SPO 1997 04 24 12 39 92 3.1 -9 668.50 -69.3 -62.5 -69.7 59 -99 SPO 1997 04 24 12 40 93 3.0 -9 668.50 -69.3 -62.4 -69.6 60 -99 SPO 1997 04 24 12 41 95 2.9 -9 668.60 -69.2 -62.4 -69.6 59 -99 SPO 1997 04 24 12 42 97 2.8 -9 668.60 -69.2 -62.3 -69.6 59 -99 SPO 1997 04 24 12 43 97 2.8 -9 668.60 -69.3 -62.3 -69.6 60 -99 SPO 1997 04 24 12 44 96 2.8 -9 668.60 -69.3 -62.3 -69.6 60 -99 SPO 1997 04 24 12 45 96 2.8 -9 668.60 -69.4 -62.3 -69.6 60 -99 SPO 1997 04 24 12 46 96 2.7 -9 668.60 -69.5 -62.2 -69.7 60 -99 SPO 1997 04 24 12 47 94 3.0 -9 668.60 -69.6 -61.8 -69.7 61 -99 SPO 1997 04 24 12 48 91 3.1 -9 668.60 -69.8 -61.3 -69.7 62 -99 SPO 1997 04 24 12 49 89 3.2 -9 668.50 -70.0 -61.1 -69.8 63 -99 SPO 1997 04 24 12 50 87 3.4 -9 668.50 -70.1 -60.9 -69.9 63 -99 SPO 1997 04 24 12 51 85 3.5 -9 668.50 -70.1 -60.7 -69.9 63 -99 SPO 1997 04 24 12 52 83 3.5 -9 668.50 -70.1 -60.4 -70.0 62 -99 SPO 1997 04 24 12 53 83 3.4 -9 668.50 -70.1 -60.2 -70.0 62 -99 SPO 1997 04 24 12 54 82 3.4 -9 668.60 -70.0 -60.6 -69.9 61 -99 SPO 1997 04 24 12 55 82 3.5 -9 668.60 -69.9 -60.7 -69.9 61 -99 SPO 1997 04 24 12 56 82 3.6 -9 668.60 -69.7 -60.6 -69.8 59 -99 SPO 1997 04 24 12 57 80 3.7 -9 668.50 -69.6 -60.2 -69.7 59 -99 SPO 1997 04 24 12 58 80 3.9 -9 668.50 -69.5 -59.6 -69.7 58 -99 SPO 1997 04 24 12 59 78 4.0 -9 668.50 -69.5 -60.0 -69.6 59 -99 SPO 1997 04 24 13 00 78 3.9 -9 668.50 -69.5 -60.4 -69.6 60 0 SPO 1997 04 24 13 01 79 3.9 -9 668.50 -69.4 -60.5 -69.6 60 -99 SPO 1997 04 24 13 02 79 3.8 -9 668.50 -69.4 -60.6 -69.6 60 -99 SPO 1997 04 24 13 03 78 3.8 -9 668.50 -69.3 -60.3 -69.6 59 -99 SPO 1997 04 24 13 04 79 3.7 -9 668.60 -69.3 -60.4 -69.6 59 -99 SPO 1997 04 24 13 05 80 3.7 -9 668.60 -69.4 -60.8 -69.6 60 -99 SPO 1997 04 24 13 06 80 3.7 -9 668.60 -69.5 -60.9 -69.7 61 -99 SPO 1997 04 24 13 07 80 3.6 -9 668.60 -69.5 -61.0 -69.7 60 -99 SPO 1997 04 24 13 08 82 3.4 -9 668.60 -69.5 -61.2 -69.7 60 -99 SPO 1997 04 24 13 09 82 3.3 -9 668.60 -69.5 -61.2 -69.7 60 -99 SPO 1997 04 24 13 10 82 3.2 -9 668.60 -69.5 -61.1 -69.7 61 -99 SPO 1997 04 24 13 11 83 3.2 -9 668.60 -69.6 -61.2 -69.7 62 -99 SPO 1997 04 24 13 12 85 3.0 -9 668.60 -69.6 -61.2 -69.7 62 -99 SPO 1997 04 24 13 13 87 2.9 -9 668.70 -69.6 -61.4 -69.7 62 -99 SPO 1997 04 24 13 14 89 2.8 -9 668.80 -69.6 -61.5 -69.7 62 -99 SPO 1997 04 24 13 15 89 2.7 -9 668.80 -69.4 -61.6 -69.7 61 -99 SPO 1997 04 24 13 16 89 2.7 -9 668.70 -69.4 -61.8 -69.6 61 -99 SPO 1997 04 24 13 17 89 2.7 -9 668.70 -69.3 -61.6 -69.6 60 -99 SPO 1997 04 24 13 18 89 2.7 -9 668.70 -69.1 -61.8 -69.5 58 -99 SPO 1997 04 24 13 19 88 2.8 -9 668.70 -69.2 -61.9 -69.5 60 -99 SPO 1997 04 24 13 20 87 2.9 -9 668.80 -69.3 -62.0 -69.5 61 -99 SPO 1997 04 24 13 21 86 2.9 -9 668.80 -69.3 -61.9 -69.5 61 -99 SPO 1997 04 24 13 22 84 2.9 -9 668.70 -69.2 -61.8 -69.5 60 -99 SPO 1997 04 24 13 23 83 2.8 -9 668.80 -69.2 -61.6 -69.4 61 -99 SPO 1997 04 24 13 24 82 2.8 -9 668.80 -69.4 -61.6 -69.4 62 -99 SPO 1997 04 24 13 25 78 2.9 -9 668.80 -69.4 -61.3 -69.4 62 -99 SPO 1997 04 24 13 26 76 3.0 -9 668.80 -69.4 -61.1 -69.3 62 -99 SPO 1997 04 24 13 27 76 3.0 -9 668.80 -69.6 -61.1 -69.3 62 -99 SPO 1997 04 24 13 28 76 3.0 -9 668.80 -69.6 -61.0 -69.3 62 -99 SPO 1997 04 24 13 29 78 2.9 -9 668.80 -69.3 -60.9 -69.2 58 -99 SPO 1997 04 24 13 30 81 2.8 -9 668.80 -68.8 -60.9 -69.0 55 -99 SPO 1997 04 24 13 31 82 2.7 -9 668.80 -68.5 -61.1 -68.9 54 -99 SPO 1997 04 24 13 32 83 2.7 -9 668.80 -68.4 -61.3 -68.8 55 -99 SPO 1997 04 24 13 33 84 2.6 -9 668.80 -68.5 -61.3 -68.8 58 -99 SPO 1997 04 24 13 34 88 2.5 -9 668.90 -68.7 -61.3 -68.8 59 -99 SPO 1997 04 24 13 35 92 2.4 -9 668.90 -68.4 -61.3 -68.7 58 -99 SPO 1997 04 24 13 36 94 2.4 -9 668.90 -68.0 -61.3 -68.6 55 -99 SPO 1997 04 24 13 37 95 2.5 -9 668.90 -68.0 -61.0 -68.6 57 -99 SPO 1997 04 24 13 38 91 2.7 -9 668.80 -67.8 -60.6 -68.5 56 -99 SPO 1997 04 24 13 39 90 2.9 -9 668.80 -67.9 -60.4 -68.5 58 -99 SPO 1997 04 24 13 40 90 2.8 -9 668.80 -68.1 -60.6 -68.5 59 -99 SPO 1997 04 24 13 41 87 2.8 -9 668.80 -68.4 -60.8 -68.5 61 -99 SPO 1997 04 24 13 42 84 2.9 -9 668.80 -68.9 -61.0 -68.6 63 -99 SPO 1997 04 24 13 43 82 3.0 -9 668.80 -69.3 -60.8 -68.7 64 -99 SPO 1997 04 24 13 44 83 3.0 -9 668.80 -69.6 -60.7 -68.8 65 -99 SPO 1997 04 24 13 45 82 3.0 -9 668.80 -69.9 -60.5 -69.0 65 -99 SPO 1997 04 24 13 46 82 2.9 -9 668.80 -70.2 -60.6 -69.3 66 -99 SPO 1997 04 24 13 47 82 2.9 -9 668.80 -70.4 -60.5 -69.5 66 -99 SPO 1997 04 24 13 48 79 3.0 -9 668.80 -70.6 -60.2 -69.7 67 -99 SPO 1997 04 24 13 49 77 3.0 -9 668.80 -70.7 -59.7 -69.8 66 -99 SPO 1997 04 24 13 50 76 3.0 -9 668.80 -70.8 -59.2 -69.9 66 -99 SPO 1997 04 24 13 51 75 3.1 -9 668.80 -70.8 -58.8 -70.0 64 -99 SPO 1997 04 24 13 52 73 3.3 -9 668.80 -70.9 -58.6 -70.1 64 -99 SPO 1997 04 24 13 53 72 3.4 -9 668.70 -70.9 -58.2 -70.2 63 -99 SPO 1997 04 24 13 54 70 3.5 -9 668.70 -70.9 -57.9 -70.2 62 -99 SPO 1997 04 24 13 55 70 3.4 -9 668.70 -70.9 -57.7 -70.3 62 -99 SPO 1997 04 24 13 56 68 3.6 -9 668.70 -70.8 -57.4 -70.2 61 -99 SPO 1997 04 24 13 57 66 3.7 -9 668.70 -70.6 -57.3 -70.2 60 -99 SPO 1997 04 24 13 58 63 3.9 -9 668.70 -70.4 -57.2 -70.1 58 -99 SPO 1997 04 24 13 59 61 4.1 -9 668.70 -70.2 -57.0 -70.0 57 -99 SPO 1997 04 24 14 00 61 4.2 -9 668.60 -70.0 -57.1 -69.8 57 0 SPO 1997 04 24 14 01 60 4.2 -9 668.60 -69.8 -57.0 -69.7 56 -99 SPO 1997 04 24 14 02 60 4.2 -9 668.60 -69.6 -56.9 -69.6 55 -99 SPO 1997 04 24 14 03 61 4.0 -9 668.60 -69.4 -56.8 -69.5 55 -99 SPO 1997 04 24 14 04 63 3.9 -9 668.70 -69.2 -56.8 -69.4 55 -99 SPO 1997 04 24 14 05 65 3.7 -9 668.70 -69.1 -56.9 -69.4 55 -99 SPO 1997 04 24 14 06 65 3.7 -9 668.70 -69.0 -56.9 -69.3 56 -99 SPO 1997 04 24 14 07 65 3.8 -9 668.70 -68.9 -57.0 -69.3 57 -99 SPO 1997 04 24 14 08 67 3.7 -9 668.70 -68.9 -57.1 -69.3 58 -99 SPO 1997 04 24 14 09 68 3.8 -9 668.70 -68.9 -57.1 -69.3 58 -99 SPO 1997 04 24 14 10 67 3.9 -9 668.70 -69.0 -57.1 -69.3 60 -99 SPO 1997 04 24 14 11 66 3.8 -9 668.70 -69.0 -57.0 -69.4 60 -99 SPO 1997 04 24 14 12 65 3.8 -9 668.70 -69.1 -57.0 -69.4 60 -99 SPO 1997 04 24 14 13 65 3.7 -9 668.80 -69.2 -57.2 -69.4 60 -99 SPO 1997 04 24 14 14 66 3.4 -9 668.80 -69.2 -57.3 -69.4 60 -99 SPO 1997 04 24 14 15 69 3.3 -9 668.80 -69.3 -57.3 -69.4 60 -99 SPO 1997 04 24 14 16 71 3.1 -9 668.90 -69.3 -57.4 -69.5 60 -99 SPO 1997 04 24 14 17 74 3.0 -9 669.00 -69.3 -57.6 -69.5 60 -99 SPO 1997 04 24 14 18 76 3.0 -9 669.00 -69.3 -57.7 -69.5 61 -99 SPO 1997 04 24 14 19 76 2.9 -9 669.00 -69.3 -57.6 -69.5 61 -99 SPO 1997 04 24 14 20 78 2.8 -9 669.00 -69.3 -57.6 -69.5 62 -99 SPO 1997 04 24 14 21 81 2.6 -9 669.00 -69.2 -57.8 -69.4 61 -99 SPO 1997 04 24 14 22 84 2.4 -9 669.10 -69.0 -58.0 -69.4 60 -99 SPO 1997 04 24 14 23 84 2.3 -9 669.10 -68.6 -58.2 -69.2 58 -99 SPO 1997 04 24 14 24 84 2.2 -9 669.10 -68.4 -58.3 -69.1 58 -99 SPO 1997 04 24 14 25 80 2.3 -9 669.10 -68.5 -58.1 -69.1 59 -99 SPO 1997 04 24 14 26 79 2.2 -9 669.20 -68.7 -58.0 -69.2 61 -99 SPO 1997 04 24 14 27 77 2.3 -9 669.10 -68.8 -57.8 -69.2 61 -99 SPO 1997 04 24 14 28 74 2.4 -9 669.10 -69.1 -57.6 -69.3 63 -99 SPO 1997 04 24 14 29 74 2.3 -9 669.10 -69.2 -57.5 -69.3 64 -99 SPO 1997 04 24 14 30 74 2.2 -9 669.10 -69.1 -57.4 -69.2 62 -99 SPO 1997 04 24 14 31 76 2.3 -9 669.10 -69.1 -57.4 -69.2 62 -99 SPO 1997 04 24 14 32 78 2.2 -9 669.20 -69.2 -57.4 -69.2 62 -99 SPO 1997 04 24 14 33 77 2.2 -9 669.20 -69.4 -57.4 -69.3 64 -99 SPO 1997 04 24 14 34 74 2.4 -9 669.20 -69.6 -57.5 -69.4 64 -99 SPO 1997 04 24 14 35 74 2.3 -9 669.20 -69.6 -57.4 -69.3 63 -99 SPO 1997 04 24 14 36 74 2.4 -9 669.20 -69.5 -57.4 -69.3 62 -99 SPO 1997 04 24 14 37 76 2.4 -9 669.20 -69.5 -57.3 -69.3 62 -99 SPO 1997 04 24 14 38 81 2.2 -9 669.20 -69.5 -57.3 -69.3 61 -99 SPO 1997 04 24 14 39 89 2.2 -9 669.20 -69.1 -57.4 -69.2 58 -99 SPO 1997 04 24 14 40 93 2.2 -9 669.30 -68.4 -57.5 -68.9 55 -99 SPO 1997 04 24 14 41 99 2.1 -9 669.30 -68.4 -57.6 -68.8 56 -99 SPO 1997 04 24 14 42 108 2.0 -9 669.30 -68.5 -57.8 -68.8 58 -99 SPO 1997 04 24 14 43 111 2.0 -9 669.30 -68.8 -58.0 -68.9 61 -99 SPO 1997 04 24 14 44 114 2.0 -9 669.40 -68.7 -57.9 -68.9 61 -99 SPO 1997 04 24 14 45 118 2.0 -9 669.40 -68.4 -58.0 -68.8 59 -99 SPO 1997 04 24 14 46 116 2.1 -9 669.40 -68.3 -58.2 -68.7 59 -99 SPO 1997 04 24 14 47 117 2.1 -9 669.40 -68.0 -58.4 -68.6 57 -99 SPO 1997 04 24 14 48 116 2.2 -9 669.40 -67.8 -58.4 -68.4 56 -99 SPO 1997 04 24 14 49 115 2.4 -9 669.40 -67.8 -58.4 -68.2 58 -99 SPO 1997 04 24 14 50 114 2.3 -9 669.40 -68.2 -58.6 -68.4 62 -99 SPO 1997 04 24 14 51 117 2.4 -9 669.40 -68.4 -59.1 -68.4 63 -99 SPO 1997 04 24 14 52 119 2.4 -9 669.40 -68.5 -59.2 -68.5 63 -99 SPO 1997 04 24 14 53 119 2.4 -9 669.40 -68.8 -59.0 -68.6 64 -99 SPO 1997 04 24 14 54 119 2.4 -9 669.40 -69.6 -58.8 -69.2 70 -99 SPO 1997 04 24 14 55 122 2.3 -9 669.40 -70.0 -58.7 -69.5 70 -99 SPO 1997 04 24 14 56 122 2.3 -9 669.40 -70.1 -58.6 -69.7 69 -99 SPO 1997 04 24 14 57 121 2.4 -9 669.40 -70.2 -58.3 -69.8 69 -99 SPO 1997 04 24 14 58 120 2.4 -9 669.40 -70.3 -58.2 -69.8 69 -99 SPO 1997 04 24 14 59 118 2.2 -9 669.40 -70.2 -58.1 -69.8 66 -99 SPO 1997 04 24 15 00 121 2.2 -9 669.40 -70.1 -58.0 -69.8 64 0 SPO 1997 04 24 15 01 118 2.3 -9 669.40 -70.0 -58.1 -69.8 63 -99 SPO 1997 04 24 15 02 113 2.4 -9 669.40 -70.1 -58.0 -69.8 63 -99 SPO 1997 04 24 15 03 110 2.5 -9 669.40 -70.2 -57.8 -69.9 64 -99 SPO 1997 04 24 15 04 105 2.5 -9 669.40 -70.3 -57.7 -69.9 64 -99 SPO 1997 04 24 15 05 101 2.5 -9 669.30 -70.3 -57.6 -70.0 64 -99 SPO 1997 04 24 15 06 100 2.5 -9 669.30 -70.4 -57.6 -70.0 64 -99 SPO 1997 04 24 15 07 101 2.5 -9 669.30 -70.4 -57.5 -70.1 64 -99 SPO 1997 04 24 15 08 101 2.4 -9 669.30 -70.4 -57.4 -70.2 63 -99 SPO 1997 04 24 15 09 99 2.5 -9 669.30 -70.5 -57.3 -70.2 63 -99 SPO 1997 04 24 15 10 97 2.6 -9 669.30 -70.6 -57.3 -70.3 63 -99 SPO 1997 04 24 15 11 97 2.6 -9 669.30 -70.8 -57.4 -70.4 64 -99 SPO 1997 04 24 15 12 97 2.6 -9 669.30 -70.9 -57.3 -70.5 65 -99 SPO 1997 04 24 15 13 97 2.6 -9 669.30 -71.0 -57.3 -70.6 64 -99 SPO 1997 04 24 15 14 97 2.6 -9 669.30 -71.2 -57.4 -70.7 66 -99 SPO 1997 04 24 15 15 94 2.5 -9 669.30 -71.2 -57.6 -70.8 65 -99 SPO 1997 04 24 15 16 91 2.6 -9 669.30 -71.4 -57.6 -70.9 66 -99 SPO 1997 04 24 15 17 87 2.6 -9 669.30 -71.5 -57.6 -70.9 66 -99 SPO 1997 04 24 15 18 84 2.7 -9 669.30 -71.6 -57.6 -71.0 66 -99 SPO 1997 04 24 15 19 83 2.6 -9 669.30 -71.6 -57.6 -71.1 64 -99 SPO 1997 04 24 15 20 84 2.6 -9 669.30 -71.6 -57.6 -71.1 63 -99 SPO 1997 04 24 15 21 84 2.7 -9 669.30 -71.7 -57.6 -71.2 63 -99 SPO 1997 04 24 15 22 81 2.8 -9 669.30 -71.7 -57.7 -71.2 61 -99 SPO 1997 04 24 15 23 78 2.9 -9 669.40 -71.7 -57.8 -71.2 60 -99 SPO 1997 04 24 15 24 76 3.0 -9 669.30 -71.7 -58.0 -71.3 60 -99 SPO 1997 04 24 15 25 76 3.1 -9 669.30 -71.8 -58.0 -71.3 60 -99 SPO 1997 04 24 15 26 76 3.3 -9 669.30 -71.7 -57.9 -71.4 60 -99 SPO 1997 04 24 15 27 74 3.4 -9 669.30 -71.7 -57.9 -71.4 60 -99 SPO 1997 04 24 15 28 74 3.3 -9 669.30 -71.7 -57.8 -71.4 60 -99 SPO 1997 04 24 15 29 74 3.2 -9 669.40 -71.7 -57.7 -71.4 60 -99 SPO 1997 04 24 15 30 74 3.4 -9 669.40 -71.7 -57.8 -71.4 60 -99 SPO 1997 04 24 15 31 74 3.4 -9 669.40 -71.7 -57.8 -71.4 60 -99 SPO 1997 04 24 15 32 76 3.4 -9 669.40 -71.7 -58.0 -71.5 60 -99 SPO 1997 04 24 15 33 77 3.4 -9 669.40 -71.7 -58.2 -71.5 59 -99 SPO 1997 04 24 15 34 78 3.4 -9 669.40 -71.7 -58.5 -71.5 58 -99 SPO 1997 04 24 15 35 80 3.5 -9 669.40 -71.6 -58.5 -71.5 57 -99 SPO 1997 04 24 15 36 79 3.5 -9 669.40 -71.4 -58.6 -71.4 56 -99 SPO 1997 04 24 15 37 78 3.8 -9 669.40 -71.3 -58.6 -71.3 56 -99 SPO 1997 04 24 15 38 76 3.9 -9 669.40 -71.3 -58.9 -71.2 56 -99 SPO 1997 04 24 15 39 74 4.0 -9 669.40 -71.2 -59.0 -71.2 56 -99 SPO 1997 04 24 15 40 72 4.1 -9 669.40 -70.9 -58.8 -71.0 55 -99 SPO 1997 04 24 15 41 71 4.1 -9 669.40 -70.6 -58.5 -70.7 54 -99 SPO 1997 04 24 15 42 71 4.0 -9 669.40 -70.2 -58.3 -70.4 53 -99 SPO 1997 04 24 15 43 71 4.1 -9 669.40 -69.9 -58.2 -70.2 52 -99 SPO 1997 04 24 15 44 72 4.2 -9 669.30 -69.7 -58.1 -70.0 52 -99 SPO 1997 04 24 15 45 72 4.3 -9 669.30 -69.6 -58.1 -69.9 53 -99 SPO 1997 04 24 15 46 71 4.5 -9 669.30 -69.4 -58.2 -69.8 53 -99 SPO 1997 04 24 15 47 68 4.7 -9 669.30 -69.3 -58.5 -69.8 53 -99 SPO 1997 04 24 15 48 68 4.6 -9 669.40 -69.2 -58.5 -69.6 53 -99 SPO 1997 04 24 15 49 69 4.4 -9 669.40 -69.1 -58.4 -69.6 55 -99 SPO 1997 04 24 15 50 70 4.4 -9 669.40 -69.1 -58.5 -69.6 55 -99 SPO 1997 04 24 15 51 70 4.4 -9 669.40 -69.1 -58.5 -69.6 56 -99 SPO 1997 04 24 15 52 69 4.3 -9 669.40 -69.0 -58.4 -69.5 57 -99 SPO 1997 04 24 15 53 69 4.3 -9 669.40 -69.0 -58.7 -69.5 57 -99 SPO 1997 04 24 15 54 68 4.0 -9 669.50 -69.0 -58.9 -69.5 58 -99 SPO 1997 04 24 15 55 68 3.9 -9 669.50 -69.0 -59.5 -69.4 58 -99 SPO 1997 04 24 15 56 68 4.0 -9 669.50 -69.0 -59.6 -69.4 58 -99 SPO 1997 04 24 15 57 68 4.0 -9 669.50 -68.9 -59.2 -69.4 58 -99 SPO 1997 04 24 15 58 69 3.9 -9 669.50 -69.0 -58.8 -69.4 59 -99 SPO 1997 04 24 15 59 71 3.9 -9 669.50 -69.0 -58.8 -69.4 59 -99 SPO 1997 04 24 16 00 72 3.9 -9 669.50 -69.0 -58.7 -69.4 59 0 SPO 1997 04 24 16 01 71 3.9 -9 669.50 -69.1 -58.7 -69.5 61 -99 SPO 1997 04 24 16 02 69 4.0 -9 669.50 -69.2 -58.5 -69.5 62 -99 SPO 1997 04 24 16 03 68 4.0 -9 669.50 -69.3 -58.3 -69.5 62 -99 SPO 1997 04 24 16 04 67 3.8 -9 669.50 -69.3 -58.0 -69.5 62 -99 SPO 1997 04 24 16 05 68 3.6 -9 669.60 -69.3 -58.0 -69.5 62 -99 SPO 1997 04 24 16 06 68 3.6 -9 669.60 -69.3 -57.9 -69.5 62 -99 SPO 1997 04 24 16 07 67 3.6 -9 669.60 -69.3 -57.8 -69.5 62 -99 SPO 1997 04 24 16 08 66 3.7 -9 669.60 -69.3 -57.9 -69.5 62 -99 SPO 1997 04 24 16 09 67 3.7 -9 669.60 -69.3 -57.9 -69.5 62 -99 SPO 1997 04 24 16 10 69 3.8 -9 669.60 -69.3 -57.7 -69.5 62 -99 SPO 1997 04 24 16 11 69 3.8 -9 669.60 -69.4 -57.5 -69.5 62 -99 SPO 1997 04 24 16 12 69 3.9 -9 669.50 -69.4 -57.2 -69.5 62 -99 SPO 1997 04 24 16 13 68 3.9 -9 669.50 -69.4 -57.0 -69.5 62 -99 SPO 1997 04 24 16 14 68 4.0 -9 669.50 -69.4 -57.0 -69.5 62 -99 SPO 1997 04 24 16 15 68 4.0 -9 669.60 -69.4 -57.0 -69.5 62 -99 SPO 1997 04 24 16 16 71 3.8 -9 669.60 -69.4 -57.5 -69.5 62 -99 SPO 1997 04 24 16 17 72 3.8 -9 669.60 -69.4 -58.0 -69.5 62 -99 SPO 1997 04 24 16 18 72 3.7 -9 669.60 -69.4 -57.9 -69.5 61 -99 SPO 1997 04 24 16 19 72 3.6 -9 669.70 -69.3 -57.8 -69.5 60 -99 SPO 1997 04 24 16 20 72 3.5 -9 669.70 -69.3 -57.9 -69.5 60 -99 SPO 1997 04 24 16 21 72 3.5 -9 669.70 -69.3 -58.0 -69.5 61 -99 SPO 1997 04 24 16 22 72 3.4 -9 669.70 -69.3 -58.6 -69.5 61 -99 SPO 1997 04 24 16 23 72 3.4 -9 669.70 -69.3 -58.9 -69.5 62 -99 SPO 1997 04 24 16 24 72 3.3 -9 669.70 -69.3 -59.2 -69.5 62 -99 SPO 1997 04 24 16 25 73 3.2 -9 669.70 -69.3 -59.3 -69.5 62 -99 SPO 1997 04 24 16 26 73 3.1 -9 669.80 -69.3 -59.4 -69.5 62 -99 SPO 1997 04 24 16 27 73 3.0 -9 669.80 -69.3 -59.8 -69.5 62 -99 SPO 1997 04 24 16 28 73 2.9 -9 669.80 -69.3 -60.0 -69.5 62 -99 SPO 1997 04 24 16 29 77 2.7 -9 669.80 -69.3 -60.0 -69.5 62 -99 SPO 1997 04 24 16 30 80 2.5 -9 669.80 -69.3 -60.3 -69.5 61 -99 SPO 1997 04 24 16 31 80 2.5 -9 669.90 -69.3 -60.9 -69.5 61 -99 SPO 1997 04 24 16 32 80 2.4 -9 669.90 -69.3 -61.2 -69.5 60 -99 SPO 1997 04 24 16 33 82 2.5 -9 669.80 -69.1 -61.0 -69.4 59 -99 SPO 1997 04 24 16 34 82 2.6 -9 669.80 -69.2 -60.4 -69.4 61 -99 SPO 1997 04 24 16 35 79 2.6 -9 669.80 -69.3 -59.7 -69.5 62 -99 SPO 1997 04 24 16 36 77 2.7 -9 669.80 -69.4 -59.2 -69.5 63 -99 SPO 1997 04 24 16 37 75 2.8 -9 669.80 -69.5 -58.9 -69.6 63 -99 SPO 1997 04 24 16 38 74 2.9 -9 669.80 -69.5 -59.0 -69.6 63 -99 SPO 1997 04 24 16 39 75 2.8 -9 669.80 -69.6 -59.2 -69.6 63 -99 SPO 1997 04 24 16 40 75 2.8 -9 669.80 -69.7 -59.1 -69.6 63 -99 SPO 1997 04 24 16 41 74 2.9 -9 669.80 -69.7 -59.1 -69.6 62 -99 SPO 1997 04 24 16 42 74 2.7 -9 669.90 -69.9 -59.0 -69.6 62 -99 SPO 1997 04 24 16 43 75 2.7 -9 669.90 -69.9 -58.5 -69.7 62 -99 SPO 1997 04 24 16 44 73 2.8 -9 669.80 -69.6 -58.0 -69.6 59 -99 SPO 1997 04 24 16 45 72 2.7 -9 669.80 -69.4 -57.8 -69.5 58 -99 SPO 1997 04 24 16 46 72 2.6 -9 669.90 -69.5 -57.7 -69.4 59 -99 SPO 1997 04 24 16 47 72 2.6 -9 669.90 -69.5 -57.7 -69.5 60 -99 SPO 1997 04 24 16 48 69 2.6 -9 669.90 -69.5 -57.6 -69.5 60 -99 SPO 1997 04 24 16 49 72 2.4 -9 669.90 -69.6 -57.6 -69.5 62 -99 SPO 1997 04 24 16 50 73 2.3 -9 669.90 -69.5 -57.5 -69.5 61 -99 SPO 1997 04 24 16 51 77 2.2 -9 669.90 -69.3 -57.4 -69.4 59 -99 SPO 1997 04 24 16 52 80 2.1 -9 670.00 -69.3 -57.3 -69.4 60 -99 SPO 1997 04 24 16 53 83 2.1 -9 670.00 -69.2 -57.3 -69.4 59 -99 SPO 1997 04 24 16 54 82 2.1 -9 670.00 -69.2 -57.2 -69.4 59 -99 SPO 1997 04 24 16 55 86 2.0 -9 670.00 -69.2 -57.1 -69.4 60 -99 SPO 1997 04 24 16 56 84 2.0 -9 670.00 -69.2 -57.2 -69.4 60 -99 SPO 1997 04 24 16 57 83 2.1 -9 670.00 -69.3 -57.2 -69.4 61 -99 SPO 1997 04 24 16 58 81 2.2 -9 670.00 -69.4 -57.2 -69.4 61 -99 SPO 1997 04 24 16 59 81 2.3 -9 669.90 -69.7 -57.2 -69.5 62 -99 SPO 1997 04 24 17 00 79 2.5 -9 669.90 -69.8 -57.2 -69.6 62 0 SPO 1997 04 24 17 01 79 2.4 -9 669.90 -70.0 -57.2 -69.6 62 -99 SPO 1997 04 24 17 02 80 2.4 -9 669.90 -70.3 -57.2 -69.8 64 -99 SPO 1997 04 24 17 03 79 2.4 -9 669.90 -70.4 -57.2 -69.9 63 -99 SPO 1997 04 24 17 04 78 2.5 -9 670.00 -70.4 -57.2 -69.9 62 -99 SPO 1997 04 24 17 05 77 2.6 -9 670.00 -70.4 -57.2 -69.8 61 -99 SPO 1997 04 24 17 06 78 2.6 -9 670.00 -70.7 -57.2 -70.0 63 -99 SPO 1997 04 24 17 07 78 2.7 -9 669.90 -71.0 -57.2 -70.2 64 -99 SPO 1997 04 24 17 08 78 2.8 -9 669.90 -71.1 -57.1 -70.4 64 -99 SPO 1997 04 24 17 09 77 2.9 -9 669.90 -71.2 -57.1 -70.4 64 -99 SPO 1997 04 24 17 10 80 2.8 -9 670.00 -71.2 -57.1 -70.5 63 -99 SPO 1997 04 24 17 11 79 2.7 -9 670.00 -71.1 -57.1 -70.5 62 -99 SPO 1997 04 24 17 12 80 2.9 -9 669.90 -71.1 -57.2 -70.5 62 -99 SPO 1997 04 24 17 13 85 3.0 -9 670.00 -71.0 -57.2 -70.5 61 -99 SPO 1997 04 24 17 14 87 3.0 -9 670.00 -71.0 -57.2 -70.6 60 -99 SPO 1997 04 24 17 15 86 3.0 -9 670.00 -71.1 -57.2 -70.6 60 -99 SPO 1997 04 24 17 16 85 3.0 -9 669.90 -71.2 -57.2 -70.7 60 -99 SPO 1997 04 24 17 17 85 3.0 -9 670.00 -71.2 -57.2 -70.8 60 -99 SPO 1997 04 24 17 18 84 3.0 -9 670.00 -71.2 -57.2 -70.8 60 -99 SPO 1997 04 24 17 19 85 3.0 -9 670.00 -71.0 -57.3 -70.7 59 -99 SPO 1997 04 24 17 20 84 3.0 -9 669.90 -70.9 -57.3 -70.7 59 -99 SPO 1997 04 24 17 21 81 3.0 -9 669.90 -70.8 -57.3 -70.6 59 -99 SPO 1997 04 24 17 22 80 3.0 -9 669.90 -70.8 -57.3 -70.6 60 -99 SPO 1997 04 24 17 23 80 2.9 -9 670.00 -70.8 -57.3 -70.7 60 -99 SPO 1997 04 24 17 24 81 2.9 -9 670.00 -70.8 -57.2 -70.7 60 -99 SPO 1997 04 24 17 25 82 2.9 -9 670.00 -70.8 -57.2 -70.7 60 -99 SPO 1997 04 24 17 26 81 2.8 -9 670.00 -70.8 -57.2 -70.7 59 -99 SPO 1997 04 24 17 27 82 2.8 -9 670.00 -70.9 -57.3 -70.8 60 -99 SPO 1997 04 24 17 28 81 2.8 -9 670.00 -70.9 -57.3 -70.8 59 -99 SPO 1997 04 24 17 29 80 2.8 -9 670.00 -71.0 -57.3 -70.8 60 -99 SPO 1997 04 24 17 30 80 2.8 -9 670.00 -71.0 -57.5 -70.9 60 -99 SPO 1997 04 24 17 31 79 2.7 -9 670.00 -71.0 -57.6 -70.9 60 -99 SPO 1997 04 24 17 32 79 2.6 -9 670.10 -71.1 -57.6 -70.9 60 -99 SPO 1997 04 24 17 33 78 2.6 -9 670.00 -71.0 -57.6 -70.9 60 -99 SPO 1997 04 24 17 34 76 2.6 -9 670.10 -71.0 -57.6 -70.9 60 -99 SPO 1997 04 24 17 35 74 2.7 -9 670.10 -70.9 -57.6 -70.8 59 -99 SPO 1997 04 24 17 36 73 2.8 -9 670.10 -71.0 -57.6 -70.9 60 -99 SPO 1997 04 24 17 37 72 2.9 -9 670.00 -71.2 -57.5 -70.9 60 -99 SPO 1997 04 24 17 38 72 2.9 -9 670.10 -71.3 -57.6 -71.0 60 -99 SPO 1997 04 24 17 39 72 2.8 -9 670.10 -71.4 -57.7 -71.0 60 -99 SPO 1997 04 24 17 40 74 2.7 -9 670.10 -71.4 -57.6 -71.1 60 -99 SPO 1997 04 24 17 41 75 2.7 -9 670.10 -71.3 -57.6 -71.1 58 -99 SPO 1997 04 24 17 42 75 2.7 -9 670.10 -71.3 -57.6 -71.0 59 -99 SPO 1997 04 24 17 43 74 2.8 -9 670.10 -71.2 -57.8 -71.0 58 -99 SPO 1997 04 24 17 44 74 2.9 -9 670.10 -71.3 -57.9 -71.0 60 -99 SPO 1997 04 24 17 45 74 2.9 -9 670.10 -71.4 -57.8 -71.1 60 -99 SPO 1997 04 24 17 46 73 3.0 -9 670.10 -71.4 -57.7 -71.1 60 -99 SPO 1997 04 24 17 47 72 3.0 -9 670.10 -71.4 -57.6 -71.1 60 -99 SPO 1997 04 24 17 48 72 3.1 -9 670.10 -71.2 -57.4 -71.0 59 -99 SPO 1997 04 24 17 49 72 3.1 -9 670.20 -71.1 -57.2 -71.0 58 -99 SPO 1997 04 24 17 50 71 3.1 -9 670.20 -71.0 -57.2 -71.0 57 -99 SPO 1997 04 24 17 51 69 3.2 -9 670.20 -71.0 -57.1 -70.9 57 -99 SPO 1997 04 24 17 52 70 3.2 -9 670.20 -70.8 -57.1 -70.8 56 -99 SPO 1997 04 24 17 53 70 3.1 -9 670.20 -70.6 -57.2 -70.7 55 -99 SPO 1997 04 24 17 54 68 3.2 -9 670.20 -70.6 -57.2 -70.7 56 -99 SPO 1997 04 24 17 55 71 3.1 -9 670.20 -70.6 -57.2 -70.7 56 -99 SPO 1997 04 24 17 56 72 3.1 -9 670.20 -70.5 -57.2 -70.7 56 -99 SPO 1997 04 24 17 57 74 3.2 -9 670.20 -70.6 -57.2 -70.7 57 -99 SPO 1997 04 24 17 58 72 3.2 -9 670.20 -70.6 -57.3 -70.7 57 -99 SPO 1997 04 24 17 59 73 3.2 -9 670.20 -70.6 -57.2 -70.7 57 -99 SPO 1997 04 24 18 00 72 3.2 -9 670.20 -70.7 -57.2 -70.7 58 0 SPO 1997 04 24 18 01 72 3.2 -9 670.30 -70.7 -57.2 -70.7 58 -99 SPO 1997 04 24 18 02 72 3.1 -9 670.30 -70.8 -57.2 -70.7 58 -99 SPO 1997 04 24 18 03 72 3.1 -9 670.30 -70.6 -57.2 -70.7 57 -99 SPO 1997 04 24 18 04 68 3.0 -9 670.30 -70.4 -57.1 -70.6 56 -99 SPO 1997 04 24 18 05 65 2.9 -9 670.30 -70.2 -57.2 -70.4 55 -99 SPO 1997 04 24 18 06 65 3.0 -9 670.30 -70.2 -57.3 -70.4 56 -99 SPO 1997 04 24 18 07 66 3.0 -9 670.30 -70.2 -57.5 -70.4 57 -99 SPO 1997 04 24 18 08 65 2.9 -9 670.30 -70.0 -57.4 -70.3 56 -99 SPO 1997 04 24 18 09 61 3.0 -9 670.30 -70.0 -57.4 -70.2 57 -99 SPO 1997 04 24 18 10 59 2.9 -9 670.30 -69.9 -57.4 -70.1 57 -99 SPO 1997 04 24 18 11 57 2.9 -9 670.30 -69.8 -57.6 -70.1 56 -99 SPO 1997 04 24 18 12 56 2.9 -9 670.30 -69.7 -57.5 -70.0 57 -99 SPO 1997 04 24 18 13 56 2.8 -9 670.30 -69.4 -57.3 -69.8 55 -99 SPO 1997 04 24 18 14 57 2.7 -9 670.40 -69.2 -57.2 -69.6 55 -99 SPO 1997 04 24 18 15 57 2.8 -9 670.40 -69.0 -57.2 -69.5 54 -99 SPO 1997 04 24 18 16 60 2.8 -9 670.40 -68.9 -57.2 -69.5 55 -99 SPO 1997 04 24 18 17 62 2.8 -9 670.40 -68.9 -57.1 -69.4 56 -99 SPO 1997 04 24 18 18 62 2.8 -9 670.40 -68.8 -57.2 -69.4 56 -99 SPO 1997 04 24 18 19 64 2.8 -9 670.40 -68.9 -57.2 -69.4 58 -99 SPO 1997 04 24 18 20 65 2.8 -9 670.40 -68.9 -57.2 -69.3 58 -99 SPO 1997 04 24 18 21 65 2.7 -9 670.40 -68.8 -57.2 -69.2 58 -99 SPO 1997 04 24 18 22 65 2.7 -9 670.50 -68.8 -57.1 -69.2 58 -99 SPO 1997 04 24 18 23 67 2.7 -9 670.50 -68.8 -57.1 -69.2 58 -99 SPO 1997 04 24 18 24 67 2.6 -9 670.50 -68.6 -57.0 -69.1 56 -99 SPO 1997 04 24 18 25 65 2.7 -9 670.50 -68.7 -57.0 -69.1 57 -99 SPO 1997 04 24 18 26 64 2.8 -9 670.50 -68.7 -57.2 -69.1 58 -99 SPO 1997 04 24 18 27 65 2.8 -9 670.60 -68.9 -57.2 -69.2 59 -99 SPO 1997 04 24 18 28 66 2.9 -9 670.60 -69.0 -57.3 -69.2 60 -99 SPO 1997 04 24 18 29 67 2.9 -9 670.60 -69.2 -57.5 -69.3 62 -99 SPO 1997 04 24 18 30 69 3.0 -9 670.50 -69.3 -57.5 -69.3 62 -99 SPO 1997 04 24 18 31 71 2.9 -9 670.50 -69.4 -57.6 -69.4 63 -99 SPO 1997 04 24 18 32 72 3.0 -9 670.50 -69.6 -57.6 -69.4 64 -99 SPO 1997 04 24 18 33 74 3.0 -9 670.60 -69.6 -57.8 -69.5 63 -99 SPO 1997 04 24 18 34 76 2.9 -9 670.60 -69.6 -57.8 -69.5 63 -99 SPO 1997 04 24 18 35 77 3.0 -9 670.60 -69.4 -57.8 -69.4 62 -99 SPO 1997 04 24 18 36 76 3.0 -9 670.60 -69.3 -57.8 -69.4 61 -99 SPO 1997 04 24 18 37 76 2.9 -9 670.60 -69.3 -57.6 -69.4 61 -99 SPO 1997 04 24 18 38 76 2.8 -9 670.70 -69.4 -57.4 -69.4 62 -99 SPO 1997 04 24 18 39 74 3.0 -9 670.70 -69.5 -57.4 -69.5 62 -99 SPO 1997 04 24 18 40 74 3.1 -9 670.60 -69.6 -57.4 -69.5 63 -99 SPO 1997 04 24 18 41 73 3.1 -9 670.60 -69.7 -57.7 -69.6 64 -99 SPO 1997 04 24 18 42 73 3.1 -9 670.70 -69.7 -57.8 -69.6 64 -99 SPO 1997 04 24 18 43 74 3.1 -9 670.70 -69.7 -57.8 -69.6 64 -99 SPO 1997 04 24 18 44 74 3.2 -9 670.60 -69.7 -57.7 -69.6 63 -99 SPO 1997 04 24 18 45 76 3.2 -9 670.70 -69.7 -57.6 -69.6 62 -99 SPO 1997 04 24 18 46 77 3.2 -9 670.70 -69.8 -57.7 -69.7 63 -99 SPO 1997 04 24 18 47 77 3.1 -9 670.70 -69.8 -57.8 -69.8 62 -99 SPO 1997 04 24 18 48 78 3.1 -9 670.70 -69.9 -57.7 -69.8 63 -99 SPO 1997 04 24 18 49 78 3.2 -9 670.70 -70.0 -57.7 -69.8 63 -99 SPO 1997 04 24 18 50 76 3.2 -9 670.70 -70.2 -57.7 -69.9 65 -99 SPO 1997 04 24 18 51 75 3.2 -9 670.70 -70.3 -57.4 -70.0 65 -99 SPO 1997 04 24 18 52 72 3.4 -9 670.70 -70.5 -57.5 -70.1 65 -99 SPO 1997 04 24 18 53 71 3.4 -9 670.70 -70.8 -57.7 -70.2 68 -99 SPO 1997 04 24 18 54 73 3.3 -9 670.70 -71.0 -57.7 -70.4 67 -99 SPO 1997 04 24 18 55 76 3.3 -9 670.70 -71.1 -57.7 -70.5 68 -99 SPO 1997 04 24 18 56 76 3.2 -9 670.70 -71.2 -57.7 -70.6 67 -99 SPO 1997 04 24 18 57 78 3.2 -9 670.70 -71.3 -57.6 -70.7 67 -99 SPO 1997 04 24 18 58 78 3.2 -9 670.70 -71.4 -57.5 -70.8 66 -99 SPO 1997 04 24 18 59 76 3.0 -9 670.70 -71.5 -57.5 -70.8 65 -99 SPO 1997 04 24 19 00 74 3.0 -9 670.70 -71.5 -57.5 -70.9 64 0 SPO 1997 04 24 19 01 72 3.0 -9 670.70 -71.5 -57.5 -70.9 64 -99 SPO 1997 04 24 19 02 70 3.0 -9 670.70 -71.5 -57.4 -71.0 63 -99 SPO 1997 04 24 19 03 70 3.1 -9 670.70 -71.5 -57.3 -71.0 63 -99 SPO 1997 04 24 19 04 70 3.1 -9 670.70 -71.5 -57.3 -71.0 62 -99 SPO 1997 04 24 19 05 70 3.1 -9 670.70 -71.6 -57.2 -71.1 62 -99 SPO 1997 04 24 19 06 70 3.1 -9 670.70 -71.6 -57.2 -71.1 62 -99 SPO 1997 04 24 19 07 71 3.1 -9 670.70 -71.7 -57.2 -71.2 62 -99 SPO 1997 04 24 19 08 69 3.0 -9 670.70 -71.8 -57.2 -71.2 62 -99 SPO 1997 04 24 19 09 68 3.0 -9 670.70 -71.8 -57.1 -71.3 62 -99 SPO 1997 04 24 19 10 67 3.0 -9 670.80 -71.9 -57.1 -71.3 62 -99 SPO 1997 04 24 19 11 67 2.9 -9 670.80 -71.8 -57.0 -71.4 60 -99 SPO 1997 04 24 19 12 68 2.9 -9 670.80 -71.8 -57.0 -71.3 60 -99 SPO 1997 04 24 19 13 68 3.0 -9 670.80 -71.8 -56.9 -71.4 60 -99 SPO 1997 04 24 19 14 68 3.0 -9 670.80 -71.8 -56.9 -71.4 60 -99 SPO 1997 04 24 19 15 68 3.0 -9 670.80 -71.8 -56.9 -71.4 60 -99 SPO 1997 04 24 19 16 68 2.9 -9 670.80 -71.8 -56.9 -71.4 60 -99 SPO 1997 04 24 19 17 67 2.9 -9 670.80 -71.6 -57.0 -71.4 59 -99 SPO 1997 04 24 19 18 68 3.0 -9 670.80 -71.6 -57.1 -71.4 60 -99 SPO 1997 04 24 19 19 68 3.0 -9 670.80 -71.7 -57.0 -71.4 60 -99 SPO 1997 04 24 19 20 68 3.0 -9 670.80 -71.7 -57.1 -71.4 60 -99 SPO 1997 04 24 19 21 68 3.0 -9 670.80 -71.6 -57.2 -71.4 58 -99 SPO 1997 04 24 19 22 68 2.9 -9 670.80 -71.5 -57.3 -71.4 57 -99 SPO 1997 04 24 19 23 69 2.9 -9 670.80 -71.6 -57.4 -71.4 58 -99 SPO 1997 04 24 19 24 70 2.9 -9 670.80 -71.6 -57.5 -71.4 59 -99 SPO 1997 04 24 19 25 70 3.0 -9 670.80 -71.5 -57.6 -71.4 58 -99 SPO 1997 04 24 19 26 69 2.9 -9 670.80 -71.3 -57.7 -71.3 58 -99 SPO 1997 04 24 19 27 69 2.8 -9 670.80 -71.3 -57.8 -71.3 58 -99 SPO 1997 04 24 19 28 69 2.9 -9 670.80 -71.2 -57.8 -71.2 58 -99 SPO 1997 04 24 19 29 68 2.9 -9 670.80 -71.2 -57.7 -71.2 58 -99 SPO 1997 04 24 19 30 67 3.0 -9 670.80 -71.2 -57.6 -71.2 58 -99 SPO 1997 04 24 19 31 66 3.3 -9 670.80 -71.2 -57.9 -71.2 57 -99 SPO 1997 04 24 19 32 65 3.4 -9 670.80 -71.2 -58.2 -71.1 57 -99 SPO 1997 04 24 19 33 65 3.5 -9 670.80 -71.2 -58.1 -71.2 57 -99 SPO 1997 04 24 19 34 65 3.5 -9 670.80 -71.1 -58.0 -71.1 56 -99 SPO 1997 04 24 19 35 65 3.3 -9 670.80 -71.0 -58.2 -71.0 56 -99 SPO 1997 04 24 19 36 65 3.2 -9 670.80 -70.9 -58.1 -70.9 57 -99 SPO 1997 04 24 19 37 65 3.2 -9 670.80 -70.8 -58.0 -70.9 57 -99 SPO 1997 04 24 19 38 65 3.3 -9 670.80 -70.8 -58.1 -70.9 57 -99 SPO 1997 04 24 19 39 65 3.3 -9 670.80 -70.6 -58.2 -70.8 57 -99 SPO 1997 04 24 19 40 65 3.4 -9 670.80 -70.6 -58.3 -70.7 57 -99 SPO 1997 04 24 19 41 66 3.5 -9 670.80 -70.6 -58.4 -70.7 57 -99 SPO 1997 04 24 19 42 67 3.6 -9 670.80 -70.6 -58.4 -70.7 57 -99 SPO 1997 04 24 19 43 69 3.6 -9 670.80 -70.6 -58.6 -70.7 57 -99 SPO 1997 04 24 19 44 72 3.5 -9 670.80 -70.5 -58.7 -70.6 57 -99 SPO 1997 04 24 19 45 72 3.4 -9 670.90 -70.4 -58.8 -70.6 57 -99 SPO 1997 04 24 19 46 73 3.2 -9 670.90 -70.2 -58.6 -70.5 56 -99 SPO 1997 04 24 19 47 72 3.3 -9 670.90 -70.2 -58.2 -70.5 57 -99 SPO 1997 04 24 19 48 69 3.5 -9 670.80 -70.2 -57.9 -70.5 57 -99 SPO 1997 04 24 19 49 69 3.5 -9 670.80 -70.1 -57.7 -70.4 57 -99 SPO 1997 04 24 19 50 69 3.6 -9 670.80 -70.2 -57.7 -70.4 59 -99 SPO 1997 04 24 19 51 66 3.6 -9 670.80 -70.4 -57.7 -70.5 61 -99 SPO 1997 04 24 19 52 66 3.6 -9 670.80 -70.5 -57.6 -70.6 61 -99 SPO 1997 04 24 19 53 66 3.5 -9 670.80 -70.4 -57.5 -70.5 60 -99 SPO 1997 04 24 19 54 65 3.5 -9 670.80 -70.4 -57.4 -70.4 59 -99 SPO 1997 04 24 19 55 64 3.5 -9 670.80 -70.3 -57.3 -70.4 58 -99 SPO 1997 04 24 19 56 63 3.6 -9 670.80 -70.3 -57.1 -70.4 58 -99 SPO 1997 04 24 19 57 62 3.6 -9 670.80 -70.3 -57.2 -70.4 59 -99 SPO 1997 04 24 19 58 62 3.6 -9 670.80 -70.2 -57.2 -70.3 58 -99 SPO 1997 04 24 19 59 61 3.6 -9 670.80 -70.2 -57.1 -70.3 59 -99 SPO 1997 04 24 20 00 60 3.5 -9 670.80 -70.0 -57.0 -70.2 58 0 SPO 1997 04 24 20 01 60 3.5 -9 670.80 -69.9 -56.9 -70.1 58 -99 SPO 1997 04 24 20 02 62 3.2 -9 670.80 -69.8 -57.0 -70.0 57 -99 SPO 1997 04 24 20 03 61 3.3 -9 670.80 -69.8 -57.0 -70.0 58 -99 SPO 1997 04 24 20 04 59 3.4 -9 670.80 -69.6 -56.9 -69.9 57 -99 SPO 1997 04 24 20 05 60 3.2 -9 670.80 -69.6 -57.0 -69.8 58 -99 SPO 1997 04 24 20 06 61 3.1 -9 670.80 -69.6 -57.0 -69.9 59 -99 SPO 1997 04 24 20 07 61 3.0 -9 670.80 -69.7 -56.9 -69.9 60 -99 SPO 1997 04 24 20 08 63 3.0 -9 670.80 -69.7 -56.7 -69.9 60 -99 SPO 1997 04 24 20 09 63 3.0 -9 670.80 -69.7 -56.4 -69.9 60 -99 SPO 1997 04 24 20 10 65 3.0 -9 670.80 -69.8 -56.2 -69.9 62 -99 SPO 1997 04 24 20 11 66 3.0 -9 670.90 -69.8 -56.2 -70.0 62 -99 SPO 1997 04 24 20 12 71 2.8 -9 670.90 -70.0 -56.2 -70.0 63 -99 SPO 1997 04 24 20 13 74 2.8 -9 671.00 -70.2 -56.3 -70.2 64 -99 SPO 1997 04 24 20 14 75 2.7 -9 671.00 -70.2 -56.3 -70.2 64 -99 SPO 1997 04 24 20 15 76 2.8 -9 671.00 -70.2 -56.4 -70.2 63 -99 SPO 1997 04 24 20 16 77 2.8 -9 671.00 -70.4 -56.6 -70.3 63 -99 SPO 1997 04 24 20 17 75 2.8 -9 671.00 -70.6 -56.6 -70.4 64 -99 SPO 1997 04 24 20 18 73 2.8 -9 671.00 -70.8 -56.8 -70.5 64 -99 SPO 1997 04 24 20 19 71 2.8 -9 671.00 -71.0 -56.9 -70.6 66 -99 SPO 1997 04 24 20 20 69 2.8 -9 671.00 -71.2 -57.0 -70.7 67 -99 SPO 1997 04 24 20 21 67 2.9 -9 671.00 -71.4 -56.9 -70.8 67 -99 SPO 1997 04 24 20 22 67 3.1 -9 671.00 -71.5 -56.7 -70.8 67 -99 SPO 1997 04 24 20 23 67 3.2 -9 671.00 -71.5 -56.4 -71.0 67 -99 SPO 1997 04 24 20 24 67 3.3 -9 671.00 -71.5 -56.2 -71.0 66 -99 SPO 1997 04 24 20 25 65 3.4 -9 670.90 -71.5 -56.2 -71.1 65 -99 SPO 1997 04 24 20 26 63 3.6 -9 670.90 -71.5 -56.2 -71.1 65 -99 SPO 1997 04 24 20 27 62 3.8 -9 671.00 -71.3 -56.3 -71.0 62 -99 SPO 1997 04 24 20 28 61 3.9 -9 671.00 -71.1 -56.3 -70.9 60 -99 SPO 1997 04 24 20 29 61 4.0 -9 670.90 -71.0 -56.2 -70.8 60 -99 SPO 1997 04 24 20 30 61 3.9 -9 671.00 -70.8 -56.1 -70.7 59 -99 SPO 1997 04 24 20 31 61 3.8 -9 671.00 -70.6 -56.1 -70.6 58 -99 SPO 1997 04 24 20 32 60 3.7 -9 671.00 -70.5 -56.0 -70.5 58 -99 SPO 1997 04 24 20 33 61 3.7 -9 671.00 -70.3 -56.0 -70.4 58 -99 SPO 1997 04 24 20 34 62 3.6 -9 671.00 -70.1 -56.0 -70.3 58 -99 SPO 1997 04 24 20 35 65 3.5 -9 671.00 -69.9 -56.2 -70.2 57 -99 SPO 1997 04 24 20 36 67 3.5 -9 671.00 -69.8 -56.2 -70.2 58 -99 SPO 1997 04 24 20 37 69 3.5 -9 671.00 -69.8 -56.3 -70.2 59 -99 SPO 1997 04 24 20 38 71 3.5 -9 671.00 -69.8 -56.3 -70.2 59 -99 SPO 1997 04 24 20 39 73 3.5 -9 671.10 -69.9 -56.5 -70.2 61 -99 SPO 1997 04 24 20 40 73 3.5 -9 671.10 -69.9 -56.9 -70.3 61 -99 SPO 1997 04 24 20 41 72 3.5 -9 671.10 -69.9 -56.7 -70.3 61 -99 SPO 1997 04 24 20 42 71 3.5 -9 671.10 -69.9 -56.6 -70.2 61 -99 SPO 1997 04 24 20 43 69 3.4 -9 671.10 -69.9 -56.5 -70.2 61 -99 SPO 1997 04 24 20 44 70 3.3 -9 671.10 -69.9 -56.4 -70.2 61 -99 SPO 1997 04 24 20 45 70 3.2 -9 671.20 -69.9 -56.5 -70.2 61 -99 SPO 1997 04 24 20 46 70 3.1 -9 671.20 -70.0 -56.5 -70.2 62 -99 SPO 1997 04 24 20 47 70 3.0 -9 671.30 -70.1 -56.6 -70.3 63 -99 SPO 1997 04 24 20 48 69 3.1 -9 671.20 -70.2 -56.5 -70.3 64 -99 SPO 1997 04 24 20 49 70 3.1 -9 671.30 -70.3 -56.4 -70.4 65 -99 SPO 1997 04 24 20 50 70 3.0 -9 671.30 -70.4 -56.5 -70.4 65 -99 SPO 1997 04 24 20 51 73 2.9 -9 671.30 -70.4 -56.5 -70.4 64 -99 SPO 1997 04 24 20 52 73 2.8 -9 671.30 -70.5 -56.4 -70.4 63 -99 SPO 1997 04 24 20 53 72 2.7 -9 671.30 -70.5 -56.4 -70.5 63 -99 SPO 1997 04 24 20 54 74 2.6 -9 671.30 -70.3 -56.4 -70.4 61 -99 SPO 1997 04 24 20 55 76 2.5 -9 671.40 -70.4 -56.6 -70.4 62 -99 SPO 1997 04 24 20 56 75 2.5 -9 671.30 -70.4 -56.6 -70.5 63 -99 SPO 1997 04 24 20 57 72 2.6 -9 671.30 -70.4 -56.5 -70.5 63 -99 SPO 1997 04 24 20 58 72 2.6 -9 671.30 -70.7 -56.3 -70.6 65 -99 SPO 1997 04 24 20 59 72 2.5 -9 671.40 -70.8 -56.4 -70.7 66 -99 SPO 1997 04 24 21 00 72 2.5 -9 671.40 -70.8 -56.8 -70.7 65 0 SPO 1997 04 24 21 01 72 2.4 -9 671.40 -70.8 -57.0 -70.7 64 -99 SPO 1997 04 24 21 02 72 2.3 -9 671.40 -70.6 -57.2 -70.7 62 -99 SPO 1997 04 24 21 03 73 2.2 -9 671.40 -70.2 -57.2 -70.5 59 -99 SPO 1997 04 24 21 04 73 2.3 -9 671.40 -70.1 -57.1 -70.4 60 -99 SPO 1997 04 24 21 05 73 2.4 -9 671.40 -70.2 -57.0 -70.4 61 -99 SPO 1997 04 24 21 06 72 2.5 -9 671.40 -70.2 -56.8 -70.4 61 -99 SPO 1997 04 24 21 07 72 2.5 -9 671.40 -70.5 -56.5 -70.5 64 -99 SPO 1997 04 24 21 08 72 2.4 -9 671.40 -70.6 -56.6 -70.6 65 -99 SPO 1997 04 24 21 09 72 2.5 -9 671.40 -70.4 -56.6 -70.5 62 -99 SPO 1997 04 24 21 10 73 2.5 -9 671.40 -70.4 -56.7 -70.4 62 -99 SPO 1997 04 24 21 11 73 2.6 -9 671.40 -70.4 -56.9 -70.5 62 -99 SPO 1997 04 24 21 12 72 2.7 -9 671.40 -70.4 -57.1 -70.5 61 -99 SPO 1997 04 24 21 13 71 2.6 -9 671.40 -70.6 -57.4 -70.5 62 -99 SPO 1997 04 24 21 14 71 2.6 -9 671.50 -70.6 -57.6 -70.5 61 -99 SPO 1997 04 24 21 15 72 2.6 -9 671.50 -70.8 -57.8 -70.6 62 -99 SPO 1997 04 24 21 16 76 2.7 -9 671.50 -70.7 -57.8 -70.6 61 -99 SPO 1997 04 24 21 17 77 2.7 -9 671.50 -70.5 -57.7 -70.5 59 -99 SPO 1997 04 24 21 18 79 2.7 -9 671.50 -70.5 -57.7 -70.4 59 -99 SPO 1997 04 24 21 19 79 2.6 -9 671.50 -70.4 -57.7 -70.4 59 -99 SPO 1997 04 24 21 20 76 2.7 -9 671.50 -70.5 -57.6 -70.4 60 -99 SPO 1997 04 24 21 21 75 2.7 -9 671.50 -70.4 -57.6 -70.4 59 -99 SPO 1997 04 24 21 22 75 2.5 -9 671.50 -70.4 -57.6 -70.4 60 -99 SPO 1997 04 24 21 23 76 2.5 -9 671.50 -70.4 -57.6 -70.3 60 -99 SPO 1997 04 24 21 24 78 2.5 -9 671.50 -70.4 -57.6 -70.3 59 -99 SPO 1997 04 24 21 25 81 2.5 -9 671.50 -70.4 -57.7 -70.3 59 -99 SPO 1997 04 24 21 26 85 2.4 -9 671.50 -70.5 -58.1 -70.3 59 -99 SPO 1997 04 24 21 27 88 2.3 -9 671.60 -70.6 -58.6 -70.4 61 -99 SPO 1997 04 24 21 28 89 2.2 -9 671.60 -70.7 -59.0 -70.4 61 -99 SPO 1997 04 24 21 29 89 2.1 -9 671.60 -70.7 -58.9 -70.4 61 -99 SPO 1997 04 24 21 30 91 2.1 -9 671.60 -70.4 -59.0 -70.3 59 -99 SPO 1997 04 24 21 31 92 2.1 -9 671.60 -70.2 -58.8 -70.2 58 -99 SPO 1997 04 24 21 32 92 2.1 -9 671.50 -70.2 -58.6 -70.2 59 -99 SPO 1997 04 24 21 33 92 2.2 -9 671.60 -70.3 -58.4 -70.2 61 -99 SPO 1997 04 24 21 34 88 2.2 -9 671.60 -70.1 -58.3 -70.0 60 -99 SPO 1997 04 24 21 35 86 2.3 -9 671.60 -69.9 -58.3 -69.9 58 -99 SPO 1997 04 24 21 36 86 2.2 -9 671.60 -69.8 -58.3 -69.8 58 -99 SPO 1997 04 24 21 37 86 2.2 -9 671.60 -70.0 -58.2 -69.9 60 -99 SPO 1997 04 24 21 38 87 2.1 -9 671.60 -70.2 -58.2 -70.1 61 -99 SPO 1997 04 24 21 39 83 2.1 -9 671.60 -70.3 -58.2 -70.2 61 -99 SPO 1997 04 24 21 40 82 2.1 -9 671.60 -70.3 -58.3 -70.2 61 -99 SPO 1997 04 24 21 41 85 2.1 -9 671.60 -70.6 -58.4 -70.3 63 -99 SPO 1997 04 24 21 42 86 2.2 -9 671.60 -70.8 -58.7 -70.4 65 -99 SPO 1997 04 24 21 43 87 2.1 -9 671.70 -70.7 -58.8 -70.4 64 -99 SPO 1997 04 24 21 44 90 2.1 -9 671.70 -70.6 -58.6 -70.2 63 -99 SPO 1997 04 24 21 45 84 2.2 -9 671.70 -70.8 -58.4 -70.4 65 -99 SPO 1997 04 24 21 46 83 2.2 -9 671.70 -70.9 -58.2 -70.5 65 -99 SPO 1997 04 24 21 47 80 2.2 -9 671.70 -70.8 -58.1 -70.5 62 -99 SPO 1997 04 24 21 48 75 2.2 -9 671.70 -70.9 -58.1 -70.6 63 -99 SPO 1997 04 24 21 49 73 2.2 -9 671.70 -71.0 -58.0 -70.6 63 -99 SPO 1997 04 24 21 50 70 2.3 -9 671.70 -70.9 -58.0 -70.6 62 -99 SPO 1997 04 24 21 51 73 2.3 -9 671.70 -71.1 -57.9 -70.7 63 -99 SPO 1997 04 24 21 52 72 2.4 -9 671.70 -71.2 -57.9 -70.8 63 -99 SPO 1997 04 24 21 53 70 2.5 -9 671.70 -71.3 -57.9 -70.8 64 -99 SPO 1997 04 24 21 54 69 2.5 -9 671.70 -71.3 -57.9 -70.8 63 -99 SPO 1997 04 24 21 55 69 2.5 -9 671.70 -71.4 -58.0 -70.8 64 -99 SPO 1997 04 24 21 56 69 2.4 -9 671.70 -71.4 -57.9 -70.8 62 -99 SPO 1997 04 24 21 57 68 2.4 -9 671.70 -71.4 -57.9 -70.9 62 -99 SPO 1997 04 24 21 58 65 2.5 -9 671.70 -71.4 -57.9 -70.9 61 -99 SPO 1997 04 24 21 59 62 2.6 -9 671.70 -71.3 -57.9 -70.9 60 -99 SPO 1997 04 24 22 00 62 2.8 -9 671.70 -71.3 -57.8 -70.9 60 0 SPO 1997 04 24 22 01 62 2.8 -9 671.70 -71.3 -57.9 -70.9 60 -99 SPO 1997 04 24 22 02 60 2.9 -9 671.70 -71.3 -57.8 -70.8 60 -99 SPO 1997 04 24 22 03 58 2.9 -9 671.70 -71.2 -57.7 -70.8 59 -99 SPO 1997 04 24 22 04 57 3.0 -9 671.70 -70.9 -57.7 -70.7 57 -99 SPO 1997 04 24 22 05 58 3.1 -9 671.70 -70.8 -57.6 -70.6 57 -99 SPO 1997 04 24 22 06 58 3.1 -9 671.70 -70.8 -57.6 -70.6 58 -99 SPO 1997 04 24 22 07 58 3.2 -9 671.70 -70.7 -57.6 -70.6 58 -99 SPO 1997 04 24 22 08 57 3.2 -9 671.70 -70.7 -57.6 -70.6 59 -99 SPO 1997 04 24 22 09 56 3.2 -9 671.70 -70.6 -57.8 -70.6 58 -99 SPO 1997 04 24 22 10 57 3.2 -9 671.70 -70.4 -57.8 -70.4 57 -99 SPO 1997 04 24 22 11 56 3.3 -9 671.70 -70.3 -57.8 -70.3 57 -99 SPO 1997 04 24 22 12 54 3.5 -9 671.70 -70.2 -57.8 -70.2 57 -99 SPO 1997 04 24 22 13 53 3.5 -9 671.80 -70.0 -57.8 -70.0 56 -99 SPO 1997 04 24 22 14 53 3.5 -9 671.80 -69.8 -57.7 -70.0 55 -99 SPO 1997 04 24 22 15 51 3.5 -9 671.80 -69.6 -57.6 -69.8 54 -99 SPO 1997 04 24 22 16 50 3.6 -9 671.80 -69.4 -57.6 -69.7 54 -99 SPO 1997 04 24 22 17 49 3.6 -9 671.80 -69.3 -57.4 -69.6 55 -99 SPO 1997 04 24 22 18 46 3.7 -9 671.70 -69.2 -57.4 -69.5 56 -99 SPO 1997 04 24 22 19 46 3.9 -9 671.70 -69.1 -57.3 -69.4 57 -99 SPO 1997 04 24 22 20 43 3.9 -9 671.70 -69.0 -57.2 -69.3 58 -99 SPO 1997 04 24 22 21 40 3.7 -9 671.70 -68.8 -57.2 -69.2 56 -99 SPO 1997 04 24 22 22 40 3.8 -9 671.70 -68.7 -57.2 -69.0 57 -99 SPO 1997 04 24 22 23 40 3.6 -9 671.70 -68.6 -57.2 -69.0 58 -99 SPO 1997 04 24 22 24 40 3.5 -9 671.70 -68.5 -57.2 -68.8 58 -99 SPO 1997 04 24 22 25 49 3.4 -9 671.80 -68.4 -57.2 -68.8 58 -99 SPO 1997 04 24 22 26 55 3.1 -9 671.80 -68.4 -57.4 -68.9 59 -99 SPO 1997 04 24 22 27 54 3.2 -9 671.80 -68.4 -57.5 -68.9 60 -99 SPO 1997 04 24 22 28 53 3.2 -9 671.80 -68.4 -57.4 -68.9 61 -99 SPO 1997 04 24 22 29 53 3.1 -9 671.80 -68.4 -57.3 -68.9 61 -99 SPO 1997 04 24 22 30 56 3.0 -9 671.80 -68.3 -57.2 -68.8 62 -99 SPO 1997 04 24 22 31 57 3.0 -9 671.80 -68.4 -57.2 -68.9 63 -99 SPO 1997 04 24 22 32 58 3.0 -9 671.90 -68.5 -57.4 -68.9 63 -99 SPO 1997 04 24 22 33 59 3.1 -9 671.90 -68.5 -57.5 -69.0 63 -99 SPO 1997 04 24 22 34 60 3.0 -9 671.90 -68.6 -57.5 -69.0 64 -99 SPO 1997 04 24 22 35 62 2.9 -9 671.90 -68.6 -57.6 -69.0 63 -99 SPO 1997 04 24 22 36 67 2.9 -9 671.90 -68.7 -57.6 -69.0 64 -99 SPO 1997 04 24 22 37 71 3.1 -9 672.00 -68.8 -57.8 -69.1 65 -99 SPO 1997 04 24 22 38 74 3.2 -9 672.00 -68.9 -58.0 -69.1 66 -99 SPO 1997 04 24 22 39 75 3.2 -9 672.00 -69.0 -58.4 -69.2 67 -99 SPO 1997 04 24 22 40 75 3.1 -9 672.00 -69.0 -58.5 -69.2 67 -99 SPO 1997 04 24 22 41 75 3.0 -9 672.00 -69.0 -58.6 -69.2 67 -99 SPO 1997 04 24 22 42 78 2.9 -9 672.00 -69.0 -58.7 -69.2 67 -99 SPO 1997 04 24 22 43 79 2.8 -9 672.10 -69.1 -58.8 -69.2 67 -99 SPO 1997 04 24 22 44 84 2.7 -9 672.10 -69.1 -59.0 -69.2 66 -99 SPO 1997 04 24 22 45 86 2.7 -9 672.10 -69.2 -59.1 -69.2 67 -99 SPO 1997 04 24 22 46 88 2.6 -9 672.10 -69.4 -59.1 -69.4 68 -99 SPO 1997 04 24 22 47 88 2.5 -9 672.10 -69.4 -59.0 -69.4 67 -99 SPO 1997 04 24 22 48 89 2.5 -9 672.10 -69.5 -59.2 -69.4 67 -99 SPO 1997 04 24 22 49 89 2.5 -9 672.10 -69.8 -59.3 -69.6 70 -99 SPO 1997 04 24 22 50 86 2.3 -9 672.10 -70.1 -59.4 -69.8 71 -99 SPO 1997 04 24 22 51 86 2.2 -9 672.10 -70.4 -59.3 -70.0 73 -99 SPO 1997 04 24 22 52 76 2.4 -9 672.10 -70.6 -59.0 -70.1 73 -99 SPO 1997 04 24 22 53 71 2.5 -9 672.10 -70.7 -58.7 -70.1 72 -99 SPO 1997 04 24 22 54 72 2.5 -9 672.20 -70.8 -58.6 -70.2 71 -99 SPO 1997 04 24 22 55 69 2.5 -9 672.20 -70.8 -58.6 -70.1 69 -99 SPO 1997 04 24 22 56 64 2.6 -9 672.20 -70.6 -58.5 -70.0 66 -99 SPO 1997 04 24 22 57 62 2.5 -9 672.20 -70.5 -58.4 -70.0 65 -99 SPO 1997 04 24 22 58 65 2.4 -9 672.10 -70.4 -58.5 -70.0 63 -99 SPO 1997 04 24 22 59 70 2.5 -9 672.10 -70.3 -58.5 -70.0 62 -99 SPO 1997 04 24 23 00 69 2.5 -9 672.10 -70.2 -58.7 -69.9 62 0 SPO 1997 04 24 23 01 72 2.3 -9 672.10 -70.0 -58.8 -69.9 61 -99 SPO 1997 04 24 23 02 76 2.2 -9 672.20 -70.0 -58.8 -69.8 61 -99 SPO 1997 04 24 23 03 79 2.2 -9 672.20 -70.0 -58.8 -69.8 61 -99 SPO 1997 04 24 23 04 80 2.4 -9 672.20 -70.0 -58.8 -69.8 62 -99 SPO 1997 04 24 23 05 81 2.4 -9 672.20 -70.1 -59.0 -69.8 63 -99 SPO 1997 04 24 23 06 82 2.4 -9 672.20 -70.3 -59.3 -70.0 64 -99 SPO 1997 04 24 23 07 82 2.4 -9 672.20 -70.4 -59.4 -70.0 64 -99 SPO 1997 04 24 23 08 81 2.3 -9 672.20 -70.4 -59.3 -70.1 64 -99 SPO 1997 04 24 23 09 80 2.3 -9 672.20 -70.3 -59.2 -70.1 62 -99 SPO 1997 04 24 23 10 83 2.3 -9 672.20 -70.3 -59.3 -70.1 62 -99 SPO 1997 04 24 23 11 89 2.4 -9 672.20 -70.2 -59.4 -70.1 62 -99 SPO 1997 04 24 23 12 90 2.4 -9 672.30 -70.3 -59.6 -70.1 63 -99 SPO 1997 04 24 23 13 90 2.4 -9 672.30 -70.4 -59.6 -70.2 64 -99 SPO 1997 04 24 23 14 90 2.5 -9 672.30 -70.6 -59.7 -70.3 66 -99 SPO 1997 04 24 23 15 92 2.5 -9 672.30 -70.7 -59.7 -70.4 66 -99 SPO 1997 04 24 23 16 96 2.4 -9 672.30 -70.8 -59.9 -70.4 65 -99 SPO 1997 04 24 23 17 98 2.3 -9 672.40 -70.9 -60.1 -70.5 65 -99 SPO 1997 04 24 23 18 98 2.1 -9 672.40 -70.8 -60.2 -70.5 63 -99 SPO 1997 04 24 23 19 98 2.0 -9 672.40 -70.6 -60.2 -70.4 61 -99 SPO 1997 04 24 23 20 94 2.0 -9 672.40 -70.7 -60.3 -70.4 62 -99 SPO 1997 04 24 23 21 92 2.0 -9 672.40 -71.0 -60.5 -70.6 64 -99 SPO 1997 04 24 23 22 91 2.1 -9 672.40 -71.2 -60.4 -70.8 65 -99 SPO 1997 04 24 23 23 86 2.1 -9 672.40 -71.4 -60.3 -70.9 66 -99 SPO 1997 04 24 23 24 83 2.0 -9 672.40 -71.5 -60.2 -71.0 66 -99 SPO 1997 04 24 23 25 77 2.2 -9 672.40 -71.5 -60.0 -71.0 65 -99 SPO 1997 04 24 23 26 75 2.2 -9 672.40 -71.5 -59.6 -71.0 64 -99 SPO 1997 04 24 23 27 76 2.1 -9 672.40 -71.6 -59.7 -71.1 65 -99 SPO 1997 04 24 23 28 76 2.0 -9 672.50 -71.6 -59.8 -71.1 64 -99 SPO 1997 04 24 23 29 80 2.0 -9 672.50 -71.7 -59.9 -71.2 63 -99 SPO 1997 04 24 23 30 77 2.0 -9 672.50 -71.6 -60.0 -71.2 62 -99 SPO 1997 04 24 23 31 84 1.9 -9 672.50 -71.7 -60.0 -71.2 62 -99 SPO 1997 04 24 23 32 86 1.9 -9 672.50 -71.7 -59.8 -71.3 62 -99 SPO 1997 04 24 23 33 86 1.9 -9 672.50 -71.7 -59.8 -71.3 61 -99 SPO 1997 04 24 23 34 85 1.9 -9 672.50 -71.7 -60.0 -71.3 62 -99 SPO 1997 04 24 23 35 86 2.0 -9 672.50 -71.8 -60.3 -71.4 63 -99 SPO 1997 04 24 23 36 90 2.1 -9 672.50 -71.8 -60.7 -71.4 63 -99 SPO 1997 04 24 23 37 89 2.2 -9 672.50 -71.8 -61.0 -71.5 62 -99 SPO 1997 04 24 23 38 89 2.2 -9 672.50 -71.8 -61.2 -71.5 62 -99 SPO 1997 04 24 23 39 89 2.2 -9 672.50 -71.8 -61.2 -71.5 62 -99 SPO 1997 04 24 23 40 89 2.3 -9 672.50 -71.8 -61.2 -71.4 62 -99 SPO 1997 04 24 23 41 89 2.2 -9 672.60 -71.7 -61.2 -71.4 60 -99 SPO 1997 04 24 23 42 87 2.2 -9 672.60 -71.6 -61.3 -71.4 60 -99 SPO 1997 04 24 23 43 84 2.4 -9 672.60 -71.6 -61.2 -71.3 59 -99 SPO 1997 04 24 23 44 82 2.4 -9 672.60 -71.6 -61.2 -71.4 59 -99 SPO 1997 04 24 23 45 78 2.5 -9 672.50 -71.8 -61.3 -71.4 60 -99 SPO 1997 04 24 23 46 79 2.6 -9 672.50 -71.9 -61.4 -71.5 61 -99 SPO 1997 04 24 23 47 82 2.5 -9 672.50 -71.8 -61.4 -71.5 60 -99 SPO 1997 04 24 23 48 84 2.5 -9 672.50 -71.8 -61.6 -71.5 60 -99 SPO 1997 04 24 23 49 84 2.5 -9 672.50 -71.7 -61.6 -71.5 60 -99 SPO 1997 04 24 23 50 83 2.5 -9 672.50 -71.7 -61.5 -71.5 60 -99 SPO 1997 04 24 23 51 83 2.5 -9 672.50 -71.6 -61.2 -71.4 58 -99 SPO 1997 04 24 23 52 84 2.4 -9 672.50 -71.6 -60.9 -71.4 58 -99 SPO 1997 04 24 23 53 86 2.4 -9 672.60 -71.5 -61.1 -71.3 56 -99 SPO 1997 04 24 23 54 86 2.4 -9 672.60 -71.4 -61.0 -71.3 56 -99 SPO 1997 04 24 23 55 87 2.4 -9 672.60 -71.5 -60.8 -71.3 57 -99 SPO 1997 04 24 23 56 88 2.3 -9 672.60 -71.4 -60.7 -71.3 56 -99 SPO 1997 04 24 23 57 89 2.3 -9 672.60 -71.3 -60.5 -71.2 -99 -99 SPO 1997 04 24 23 58 88 2.2 -9 672.60 -71.3 -60.3 -71.2 -99 -99 SPO 1997 04 24 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 25 00 00 85 2.1 -9 672.60 -71.5 -60.4 -71.4 -99 0 SPO 1997 04 25 00 01 84 2.1 -9 672.60 -71.4 -60.2 -71.4 -99 -99 SPO 1997 04 25 00 02 85 2.2 -9 672.60 -71.4 -60.3 -71.3 -99 -99 SPO 1997 04 25 00 03 89 2.3 -9 672.60 -71.3 -60.5 -71.3 -99 -99 SPO 1997 04 25 00 04 89 2.2 -9 672.60 -71.3 -60.2 -71.3 -99 -99 SPO 1997 04 25 00 05 90 2.2 -9 672.60 -71.3 -60.1 -71.3 -99 -99 SPO 1997 04 25 00 06 90 2.2 -9 672.60 -71.2 -60.0 -71.2 -99 -99 SPO 1997 04 25 00 07 85 2.3 -9 672.50 -71.1 -59.8 -71.2 -99 -99 SPO 1997 04 25 00 08 82 2.2 -9 672.50 -71.0 -59.5 -71.1 -99 -99 SPO 1997 04 25 00 09 81 2.2 -9 672.50 -71.1 -59.2 -71.1 -99 -99 SPO 1997 04 25 00 10 81 2.3 -9 672.50 -71.1 -59.1 -71.1 -99 -99 SPO 1997 04 25 00 11 82 2.3 -9 672.50 -71.1 -59.3 -71.1 -99 -99 SPO 1997 04 25 00 12 85 2.3 -9 672.50 -71.1 -59.5 -71.0 -99 -99 SPO 1997 04 25 00 13 88 2.2 -9 672.60 -71.1 -59.6 -71.0 60 -99 SPO 1997 04 25 00 14 92 2.1 -9 672.60 -71.0 -60.0 -71.0 59 -99 SPO 1997 04 25 00 15 98 2.2 -9 672.60 -70.8 -60.8 -70.9 57 -99 SPO 1997 04 25 00 16 103 2.2 -9 672.60 -70.7 -61.6 -70.8 57 -99 SPO 1997 04 25 00 17 105 2.2 -9 672.60 -70.6 -62.4 -70.8 57 -99 SPO 1997 04 25 00 18 104 2.0 -9 672.60 -70.6 -62.8 -70.7 57 -99 SPO 1997 04 25 00 19 104 2.1 -9 672.60 -70.6 -63.2 -70.8 59 -99 SPO 1997 04 25 00 20 104 2.0 -9 672.60 -70.6 -63.3 -70.8 60 -99 SPO 1997 04 25 00 21 105 1.9 -9 672.60 -70.4 -63.3 -70.7 59 -99 SPO 1997 04 25 00 22 106 1.9 -9 672.70 -70.2 -63.6 -70.6 58 -99 SPO 1997 04 25 00 23 105 1.8 -9 672.60 -70.0 -63.6 -70.4 58 -99 SPO 1997 04 25 00 24 104 1.8 -9 672.60 -70.0 -63.6 -70.3 59 -99 SPO 1997 04 25 00 25 99 1.9 -9 672.60 -70.1 -63.1 -70.4 60 -99 SPO 1997 04 25 00 26 95 1.9 -9 672.60 -70.3 -62.4 -70.5 61 -99 SPO 1997 04 25 00 27 91 1.9 -9 672.60 -70.4 -62.0 -70.6 61 -99 SPO 1997 04 25 00 28 88 2.0 -9 672.60 -70.6 -61.4 -70.6 62 -99 SPO 1997 04 25 00 29 89 2.0 -9 672.60 -70.6 -60.9 -70.6 61 -99 SPO 1997 04 25 00 30 90 2.1 -9 672.60 -70.6 -60.6 -70.6 61 -99 SPO 1997 04 25 00 31 91 1.9 -9 672.60 -70.6 -60.4 -70.6 61 -99 SPO 1997 04 25 00 32 96 1.8 -9 672.60 -70.6 -60.7 -70.6 61 -99 SPO 1997 04 25 00 33 95 1.8 -9 672.60 -70.5 -60.8 -70.4 61 -99 SPO 1997 04 25 00 34 93 1.9 -9 672.60 -70.4 -60.6 -70.4 61 -99 SPO 1997 04 25 00 35 92 1.8 -9 672.60 -70.5 -60.3 -70.4 61 -99 SPO 1997 04 25 00 36 92 1.9 -9 672.60 -70.4 -60.4 -70.3 61 -99 SPO 1997 04 25 00 37 91 2.0 -9 672.60 -70.3 -60.2 -70.2 60 -99 SPO 1997 04 25 00 38 91 2.0 -9 672.60 -70.3 -60.2 -70.2 60 -99 SPO 1997 04 25 00 39 88 2.0 -9 672.60 -70.2 -60.2 -70.1 59 -99 SPO 1997 04 25 00 40 84 2.0 -9 672.60 -70.1 -60.2 -70.1 59 -99 SPO 1997 04 25 00 41 80 2.0 -9 672.50 -70.2 -60.0 -70.1 61 -99 SPO 1997 04 25 00 42 77 2.1 -9 672.50 -70.1 -59.9 -70.0 60 -99 SPO 1997 04 25 00 43 78 2.1 -9 672.50 -70.0 -59.9 -69.9 60 -99 SPO 1997 04 25 00 44 81 2.1 -9 672.50 -69.9 -60.0 -69.8 60 -99 SPO 1997 04 25 00 45 84 1.9 -9 672.50 -69.7 -60.2 -69.6 58 -99 SPO 1997 04 25 00 46 85 2.0 -9 672.50 -69.4 -60.3 -69.5 57 -99 SPO 1997 04 25 00 47 86 1.9 -9 672.50 -69.1 -60.4 -69.4 56 -99 SPO 1997 04 25 00 48 85 1.9 -9 672.50 -69.2 -60.6 -69.4 58 -99 SPO 1997 04 25 00 49 86 1.9 -9 672.50 -69.2 -60.6 -69.3 58 -99 SPO 1997 04 25 00 50 86 1.9 -9 672.50 -69.3 -60.4 -69.4 59 -99 SPO 1997 04 25 00 51 86 2.0 -9 672.50 -69.4 -60.5 -69.4 60 -99 SPO 1997 04 25 00 52 86 1.9 -9 672.50 -69.4 -60.8 -69.4 59 -99 SPO 1997 04 25 00 53 86 2.0 -9 672.50 -69.4 -61.2 -69.4 59 -99 SPO 1997 04 25 00 54 86 2.1 -9 672.50 -69.6 -61.4 -69.4 61 -99 SPO 1997 04 25 00 55 86 2.1 -9 672.50 -69.6 -61.3 -69.5 62 -99 SPO 1997 04 25 00 56 88 2.0 -9 672.50 -69.6 -61.0 -69.5 62 -99 SPO 1997 04 25 00 57 84 2.0 -9 672.50 -69.7 -60.8 -69.5 63 -99 SPO 1997 04 25 00 58 86 2.1 -9 672.50 -69.8 -60.7 -69.5 63 -99 SPO 1997 04 25 00 59 90 2.1 -9 672.60 -69.8 -60.8 -69.5 62 -99 SPO 1997 04 25 01 00 95 2.0 -9 672.60 -69.6 -60.8 -69.4 61 0 SPO 1997 04 25 01 01 101 1.8 -9 672.60 -69.3 -60.7 -69.4 58 -99 SPO 1997 04 25 01 02 106 1.8 -9 672.70 -68.9 -60.7 -69.2 57 -99 SPO 1997 04 25 01 03 106 1.8 -9 672.70 -69.0 -61.0 -69.2 59 -99 SPO 1997 04 25 01 04 106 1.9 -9 672.60 -68.9 -61.4 -69.2 59 -99 SPO 1997 04 25 01 05 104 1.9 -9 672.60 -68.8 -61.5 -69.2 59 -99 SPO 1997 04 25 01 06 104 1.9 -9 672.60 -69.0 -61.4 -69.1 62 -99 SPO 1997 04 25 01 07 103 1.9 -9 672.70 -69.6 -61.6 -69.3 67 -99 SPO 1997 04 25 01 08 100 1.9 -9 672.70 -69.9 -61.8 -69.4 69 -99 SPO 1997 04 25 01 09 99 1.9 -9 672.70 -70.0 -62.1 -69.5 68 -99 SPO 1997 04 25 01 10 97 1.9 -9 672.70 -70.0 -62.2 -69.5 66 -99 SPO 1997 04 25 01 11 97 2.0 -9 672.70 -69.8 -62.3 -69.4 63 -99 SPO 1997 04 25 01 12 97 2.0 -9 672.70 -69.8 -62.6 -69.4 62 -99 SPO 1997 04 25 01 13 97 2.0 -9 672.70 -69.8 -62.8 -69.3 62 -99 SPO 1997 04 25 01 14 97 2.0 -9 672.70 -69.7 -62.9 -69.3 61 -99 SPO 1997 04 25 01 15 97 2.1 -9 672.70 -69.8 -62.8 -69.3 62 -99 SPO 1997 04 25 01 16 97 2.1 -9 672.70 -69.8 -62.7 -69.3 62 -99 SPO 1997 04 25 01 17 100 2.1 -9 672.70 -69.9 -62.7 -69.4 63 -99 SPO 1997 04 25 01 18 101 2.1 -9 672.70 -70.0 -62.9 -69.5 63 -99 SPO 1997 04 25 01 19 101 2.1 -9 672.70 -70.0 -63.0 -69.5 63 -99 SPO 1997 04 25 01 20 97 2.2 -9 672.70 -70.2 -63.1 -69.6 64 -99 SPO 1997 04 25 01 21 96 2.2 -9 672.70 -70.3 -63.2 -69.8 65 -99 SPO 1997 04 25 01 22 97 2.2 -9 672.70 -70.5 -63.4 -69.9 65 -99 SPO 1997 04 25 01 23 98 2.2 -9 672.70 -70.6 -63.5 -70.0 65 -99 SPO 1997 04 25 01 24 98 2.2 -9 672.70 -70.7 -63.6 -70.1 65 -99 SPO 1997 04 25 01 25 98 2.3 -9 672.70 -70.7 -63.6 -70.2 64 -99 SPO 1997 04 25 01 26 97 2.3 -9 672.70 -70.7 -63.6 -70.2 64 -99 SPO 1997 04 25 01 27 96 2.3 -9 672.70 -70.7 -63.5 -70.2 64 -99 SPO 1997 04 25 01 28 95 2.3 -9 672.70 -70.7 -63.4 -70.2 64 -99 SPO 1997 04 25 01 29 94 2.3 -9 672.70 -70.6 -63.3 -70.2 63 -99 SPO 1997 04 25 01 30 92 2.4 -9 672.70 -70.6 -63.2 -70.2 64 -99 SPO 1997 04 25 01 31 91 2.5 -9 672.70 -70.5 -63.1 -70.2 63 -99 SPO 1997 04 25 01 32 91 2.5 -9 672.70 -70.6 -62.8 -70.2 63 -99 SPO 1997 04 25 01 33 91 2.5 -9 672.70 -70.6 -62.6 -70.3 62 -99 SPO 1997 04 25 01 34 92 2.5 -9 672.70 -70.7 -62.4 -70.3 63 -99 SPO 1997 04 25 01 35 94 2.6 -9 672.70 -70.6 -62.3 -70.3 62 -99 SPO 1997 04 25 01 36 95 2.6 -9 672.70 -70.5 -62.4 -70.2 61 -99 SPO 1997 04 25 01 37 94 2.6 -9 672.70 -70.4 -62.4 -70.2 61 -99 SPO 1997 04 25 01 38 93 2.6 -9 672.70 -70.4 -62.3 -70.2 61 -99 SPO 1997 04 25 01 39 92 2.6 -9 672.70 -70.5 -62.1 -70.2 62 -99 SPO 1997 04 25 01 40 91 2.7 -9 672.60 -70.4 -61.8 -70.2 61 -99 SPO 1997 04 25 01 41 89 2.7 -9 672.60 -70.4 -61.4 -70.2 61 -99 SPO 1997 04 25 01 42 89 2.7 -9 672.70 -70.4 -61.4 -70.2 62 -99 SPO 1997 04 25 01 43 88 2.7 -9 672.70 -70.4 -61.4 -70.2 62 -99 SPO 1997 04 25 01 44 88 2.8 -9 672.70 -70.3 -61.0 -70.2 61 -99 SPO 1997 04 25 01 45 89 2.8 -9 672.70 -70.3 -60.9 -70.2 61 -99 SPO 1997 04 25 01 46 90 2.9 -9 672.70 -70.3 -61.2 -70.2 61 -99 SPO 1997 04 25 01 47 89 2.9 -9 672.70 -70.3 -61.5 -70.2 61 -99 SPO 1997 04 25 01 48 89 2.8 -9 672.70 -70.3 -61.7 -70.2 61 -99 SPO 1997 04 25 01 49 89 2.9 -9 672.70 -70.4 -61.8 -70.2 62 -99 SPO 1997 04 25 01 50 89 2.9 -9 672.70 -70.5 -61.8 -70.3 63 -99 SPO 1997 04 25 01 51 90 2.9 -9 672.70 -70.5 -62.0 -70.3 63 -99 SPO 1997 04 25 01 52 90 2.9 -9 672.70 -70.5 -62.1 -70.3 63 -99 SPO 1997 04 25 01 53 90 3.0 -9 672.70 -70.5 -62.0 -70.3 63 -99 SPO 1997 04 25 01 54 90 3.0 -9 672.70 -70.5 -61.9 -70.3 63 -99 SPO 1997 04 25 01 55 93 3.0 -9 672.80 -70.4 -62.0 -70.3 62 -99 SPO 1997 04 25 01 56 93 2.9 -9 672.80 -70.5 -62.1 -70.3 62 -99 SPO 1997 04 25 01 57 94 2.9 -9 672.80 -70.6 -62.1 -70.4 63 -99 SPO 1997 04 25 01 58 94 2.9 -9 672.70 -70.6 -62.0 -70.4 62 -99 SPO 1997 04 25 01 59 96 2.9 -9 672.70 -70.6 -62.1 -70.4 62 -99 SPO 1997 04 25 02 00 99 2.8 -9 672.80 -70.6 -62.3 -70.4 61 0 SPO 1997 04 25 02 01 100 2.8 -9 672.80 -70.6 -62.5 -70.4 61 -99 SPO 1997 04 25 02 02 96 2.8 -9 672.70 -70.6 -62.5 -70.4 62 -99 SPO 1997 04 25 02 03 93 2.8 -9 672.70 -70.6 -62.4 -70.4 62 -99 SPO 1997 04 25 02 04 94 2.8 -9 672.70 -70.6 -62.3 -70.5 63 -99 SPO 1997 04 25 02 05 95 2.8 -9 672.70 -70.7 -62.4 -70.5 64 -99 SPO 1997 04 25 02 06 94 2.8 -9 672.70 -70.7 -62.4 -70.6 63 -99 SPO 1997 04 25 02 07 94 2.7 -9 672.70 -70.7 -62.4 -70.6 63 -99 SPO 1997 04 25 02 08 94 2.6 -9 672.80 -70.8 -62.3 -70.6 63 -99 SPO 1997 04 25 02 09 95 2.6 -9 672.80 -70.8 -62.3 -70.6 62 -99 SPO 1997 04 25 02 10 98 2.5 -9 672.80 -70.8 -62.2 -70.6 62 -99 SPO 1997 04 25 02 11 96 2.5 -9 672.80 -70.7 -62.1 -70.6 61 -99 SPO 1997 04 25 02 12 93 2.5 -9 672.80 -70.6 -62.0 -70.5 61 -99 SPO 1997 04 25 02 13 92 2.4 -9 672.80 -70.5 -61.9 -70.4 60 -99 SPO 1997 04 25 02 14 90 2.4 -9 672.80 -70.6 -62.0 -70.4 61 -99 SPO 1997 04 25 02 15 87 2.5 -9 672.80 -70.6 -62.0 -70.4 61 -99 SPO 1997 04 25 02 16 87 2.5 -9 672.80 -70.5 -61.7 -70.3 61 -99 SPO 1997 04 25 02 17 88 2.5 -9 672.80 -70.5 -61.5 -70.2 61 -99 SPO 1997 04 25 02 18 86 2.5 -9 672.80 -70.5 -61.6 -70.2 61 -99 SPO 1997 04 25 02 19 88 2.4 -9 672.80 -70.5 -61.7 -70.2 61 -99 SPO 1997 04 25 02 20 90 2.4 -9 672.90 -70.5 -61.8 -70.2 60 -99 SPO 1997 04 25 02 21 90 2.4 -9 672.90 -70.3 -61.8 -70.0 58 -99 SPO 1997 04 25 02 22 87 2.5 -9 672.80 -70.1 -61.6 -69.9 57 -99 SPO 1997 04 25 02 23 86 2.6 -9 672.80 -70.1 -61.7 -69.9 57 -99 SPO 1997 04 25 02 24 88 2.6 -9 672.80 -70.1 -61.6 -69.8 57 -99 SPO 1997 04 25 02 25 87 2.7 -9 672.80 -70.0 -61.3 -69.8 57 -99 SPO 1997 04 25 02 26 87 2.8 -9 672.80 -70.1 -61.5 -69.8 58 -99 SPO 1997 04 25 02 27 86 2.9 -9 672.80 -70.2 -61.4 -69.9 59 -99 SPO 1997 04 25 02 28 86 2.9 -9 672.80 -70.3 -61.0 -70.0 60 -99 SPO 1997 04 25 02 29 87 2.9 -9 672.80 -70.4 -61.1 -70.0 61 -99 SPO 1997 04 25 02 30 88 2.8 -9 672.80 -70.5 -61.4 -70.1 61 -99 SPO 1997 04 25 02 31 88 2.7 -9 672.80 -70.4 -61.8 -70.2 60 -99 SPO 1997 04 25 02 32 90 2.7 -9 672.80 -70.4 -62.0 -70.2 60 -99 SPO 1997 04 25 02 33 90 2.7 -9 672.80 -70.4 -62.1 -70.2 60 -99 SPO 1997 04 25 02 34 93 2.6 -9 672.90 -70.5 -62.1 -70.2 61 -99 SPO 1997 04 25 02 35 96 2.5 -9 672.90 -70.6 -62.2 -70.3 61 -99 SPO 1997 04 25 02 36 98 2.5 -9 672.90 -70.6 -62.2 -70.4 61 -99 SPO 1997 04 25 02 37 98 2.5 -9 672.90 -70.7 -62.2 -70.4 62 -99 SPO 1997 04 25 02 38 97 2.5 -9 672.90 -70.7 -62.1 -70.4 62 -99 SPO 1997 04 25 02 39 97 2.5 -9 672.90 -70.8 -62.0 -70.4 62 -99 SPO 1997 04 25 02 40 96 2.6 -9 672.80 -70.8 -62.0 -70.5 62 -99 SPO 1997 04 25 02 41 94 2.6 -9 672.80 -70.8 -62.0 -70.5 61 -99 SPO 1997 04 25 02 42 93 2.6 -9 672.80 -70.9 -62.0 -70.5 61 -99 SPO 1997 04 25 02 43 91 2.7 -9 672.70 -70.8 -62.0 -70.5 61 -99 SPO 1997 04 25 02 44 89 2.7 -9 672.70 -70.8 -61.9 -70.5 61 -99 SPO 1997 04 25 02 45 89 2.7 -9 672.70 -70.8 -61.8 -70.5 61 -99 SPO 1997 04 25 02 46 90 2.7 -9 672.70 -70.8 -61.8 -70.6 61 -99 SPO 1997 04 25 02 47 90 2.7 -9 672.70 -70.8 -61.8 -70.6 61 -99 SPO 1997 04 25 02 48 91 2.6 -9 672.70 -70.8 -61.8 -70.6 61 -99 SPO 1997 04 25 02 49 91 2.6 -9 672.70 -70.8 -61.8 -70.7 62 -99 SPO 1997 04 25 02 50 94 2.6 -9 672.70 -70.8 -61.8 -70.7 62 -99 SPO 1997 04 25 02 51 94 2.6 -9 672.70 -70.8 -61.8 -70.7 62 -99 SPO 1997 04 25 02 52 93 2.6 -9 672.70 -70.8 -61.8 -70.7 62 -99 SPO 1997 04 25 02 53 93 2.6 -9 672.70 -70.8 -61.8 -70.7 62 -99 SPO 1997 04 25 02 54 92 2.6 -9 672.70 -70.9 -61.7 -70.8 62 -99 SPO 1997 04 25 02 55 92 2.6 -9 672.70 -70.9 -61.6 -70.8 62 -99 SPO 1997 04 25 02 56 92 2.6 -9 672.70 -70.9 -61.6 -70.8 62 -99 SPO 1997 04 25 02 57 89 2.7 -9 672.60 -70.9 -61.5 -70.8 62 -99 SPO 1997 04 25 02 58 87 2.8 -9 672.60 -70.9 -61.3 -70.8 62 -99 SPO 1997 04 25 02 59 84 2.8 -9 672.60 -70.9 -61.2 -70.8 62 -99 SPO 1997 04 25 03 00 82 2.8 -9 672.60 -70.8 -61.1 -70.8 62 0 SPO 1997 04 25 03 01 82 2.8 -9 672.60 -70.9 -61.0 -70.8 63 -99 SPO 1997 04 25 03 02 82 2.8 -9 672.70 -70.9 -61.0 -70.8 63 -99 SPO 1997 04 25 03 03 83 2.8 -9 672.70 -70.9 -61.1 -70.8 63 -99 SPO 1997 04 25 03 04 85 2.9 -9 672.70 -70.8 -61.1 -70.8 61 -99 SPO 1997 04 25 03 05 83 2.9 -9 672.60 -70.8 -61.0 -70.8 61 -99 SPO 1997 04 25 03 06 82 3.0 -9 672.60 -70.8 -60.9 -70.8 61 -99 SPO 1997 04 25 03 07 82 3.1 -9 672.60 -70.9 -60.9 -70.8 61 -99 SPO 1997 04 25 03 08 83 3.2 -9 672.60 -70.9 -61.0 -70.8 61 -99 SPO 1997 04 25 03 09 80 3.3 -9 672.50 -70.8 -60.8 -70.8 61 -99 SPO 1997 04 25 03 10 79 3.5 -9 672.50 -70.8 -60.5 -70.8 61 -99 SPO 1997 04 25 03 11 77 3.6 -9 672.50 -70.8 -60.5 -70.8 62 -99 SPO 1997 04 25 03 12 75 3.5 -9 672.50 -70.6 -60.5 -70.7 61 -99 SPO 1997 04 25 03 13 75 3.4 -9 672.50 -70.5 -60.5 -70.6 61 -99 SPO 1997 04 25 03 14 75 3.2 -9 672.50 -70.4 -60.6 -70.5 61 -99 SPO 1997 04 25 03 15 75 3.2 -9 672.50 -70.3 -60.6 -70.5 60 -99 SPO 1997 04 25 03 16 75 3.1 -9 672.60 -70.2 -60.3 -70.4 59 -99 SPO 1997 04 25 03 17 75 3.1 -9 672.60 -70.2 -60.4 -70.4 60 -99 SPO 1997 04 25 03 18 75 3.0 -9 672.60 -70.1 -60.6 -70.4 60 -99 SPO 1997 04 25 03 19 73 3.1 -9 672.60 -70.1 -60.5 -70.4 60 -99 SPO 1997 04 25 03 20 72 3.1 -9 672.60 -70.1 -60.1 -70.3 60 -99 SPO 1997 04 25 03 21 72 3.2 -9 672.60 -70.1 -59.8 -70.3 60 -99 SPO 1997 04 25 03 22 73 3.3 -9 672.60 -70.1 -59.7 -70.3 61 -99 SPO 1997 04 25 03 23 73 3.3 -9 672.60 -70.1 -59.6 -70.3 61 -99 SPO 1997 04 25 03 24 72 3.3 -9 672.60 -70.1 -59.6 -70.3 61 -99 SPO 1997 04 25 03 25 72 3.2 -9 672.60 -70.0 -59.6 -70.2 61 -99 SPO 1997 04 25 03 26 72 3.2 -9 672.60 -69.9 -59.6 -70.1 61 -99 SPO 1997 04 25 03 27 73 3.2 -9 672.60 -69.7 -59.8 -70.0 60 -99 SPO 1997 04 25 03 28 74 3.1 -9 672.60 -69.6 -60.2 -70.0 59 -99 SPO 1997 04 25 03 29 76 3.1 -9 672.60 -69.6 -60.4 -70.0 60 -99 SPO 1997 04 25 03 30 76 3.1 -9 672.60 -69.6 -60.4 -70.0 60 -99 SPO 1997 04 25 03 31 76 3.1 -9 672.60 -69.6 -60.4 -70.0 61 -99 SPO 1997 04 25 03 32 78 3.0 -9 672.60 -69.6 -60.6 -70.0 61 -99 SPO 1997 04 25 03 33 79 3.0 -9 672.60 -69.7 -60.6 -70.0 62 -99 SPO 1997 04 25 03 34 79 2.9 -9 672.60 -69.7 -60.6 -70.0 62 -99 SPO 1997 04 25 03 35 79 2.9 -9 672.60 -69.8 -60.7 -70.1 63 -99 SPO 1997 04 25 03 36 77 2.9 -9 672.60 -69.8 -60.8 -70.1 63 -99 SPO 1997 04 25 03 37 76 2.9 -9 672.60 -69.7 -60.7 -70.0 62 -99 SPO 1997 04 25 03 38 77 2.8 -9 672.60 -69.7 -60.7 -70.0 62 -99 SPO 1997 04 25 03 39 77 2.9 -9 672.60 -69.7 -60.6 -70.0 62 -99 SPO 1997 04 25 03 40 77 2.9 -9 672.60 -69.7 -60.5 -70.0 62 -99 SPO 1997 04 25 03 41 78 3.0 -9 672.60 -69.7 -60.3 -70.0 62 -99 SPO 1997 04 25 03 42 80 3.0 -9 672.60 -69.7 -60.3 -70.0 62 -99 SPO 1997 04 25 03 43 81 2.9 -9 672.60 -69.8 -60.4 -70.0 63 -99 SPO 1997 04 25 03 44 83 2.8 -9 672.60 -69.7 -60.4 -70.0 62 -99 SPO 1997 04 25 03 45 84 2.8 -9 672.60 -69.7 -60.4 -69.9 62 -99 SPO 1997 04 25 03 46 86 2.7 -9 672.60 -69.7 -60.4 -69.9 63 -99 SPO 1997 04 25 03 47 84 2.8 -9 672.60 -69.6 -60.4 -69.9 62 -99 SPO 1997 04 25 03 48 81 2.8 -9 672.60 -69.6 -60.4 -69.9 63 -99 SPO 1997 04 25 03 49 81 2.7 -9 672.60 -69.6 -60.4 -69.8 62 -99 SPO 1997 04 25 03 50 81 2.6 -9 672.60 -69.6 -60.4 -69.8 63 -99 SPO 1997 04 25 03 51 80 2.7 -9 672.60 -69.7 -60.2 -69.8 64 -99 SPO 1997 04 25 03 52 79 2.7 -9 672.60 -69.7 -60.2 -69.8 64 -99 SPO 1997 04 25 03 53 77 2.8 -9 672.60 -69.7 -60.1 -69.8 64 -99 SPO 1997 04 25 03 54 75 3.0 -9 672.60 -69.7 -60.2 -69.8 64 -99 SPO 1997 04 25 03 55 74 3.2 -9 672.50 -69.6 -60.1 -69.8 64 -99 SPO 1997 04 25 03 56 74 3.3 -9 672.50 -69.6 -60.0 -69.7 64 -99 SPO 1997 04 25 03 57 74 3.4 -9 672.50 -69.5 -59.8 -69.7 63 -99 SPO 1997 04 25 03 58 74 3.4 -9 672.50 -69.4 -59.7 -69.6 63 -99 SPO 1997 04 25 03 59 74 3.4 -9 672.60 -69.3 -59.8 -69.5 62 -99 SPO 1997 04 25 04 00 76 3.2 -9 672.60 -69.3 -59.9 -69.5 63 0 SPO 1997 04 25 04 01 78 3.2 -9 672.60 -69.3 -60.0 -69.5 62 -99 SPO 1997 04 25 04 02 80 3.1 -9 672.60 -69.2 -60.2 -69.5 62 -99 SPO 1997 04 25 04 03 81 3.0 -9 672.70 -69.2 -60.4 -69.5 62 -99 SPO 1997 04 25 04 04 82 2.8 -9 672.70 -69.3 -60.4 -69.5 63 -99 SPO 1997 04 25 04 05 86 2.6 -9 672.70 -69.3 -60.6 -69.6 63 -99 SPO 1997 04 25 04 06 86 2.5 -9 672.80 -69.4 -60.9 -69.6 65 -99 SPO 1997 04 25 04 07 86 2.5 -9 672.80 -69.5 -60.9 -69.6 66 -99 SPO 1997 04 25 04 08 85 2.6 -9 672.70 -69.6 -60.8 -69.7 66 -99 SPO 1997 04 25 04 09 85 2.6 -9 672.70 -69.8 -60.6 -69.8 68 -99 SPO 1997 04 25 04 10 86 2.7 -9 672.70 -70.0 -60.6 -69.9 69 -99 SPO 1997 04 25 04 11 87 2.7 -9 672.70 -70.4 -60.6 -70.0 71 -99 SPO 1997 04 25 04 12 86 2.8 -9 672.70 -70.7 -60.6 -70.2 71 -99 SPO 1997 04 25 04 13 85 2.8 -9 672.70 -71.0 -60.6 -70.4 72 -99 SPO 1997 04 25 04 14 86 2.7 -9 672.80 -71.1 -60.7 -70.5 70 -99 SPO 1997 04 25 04 15 88 2.5 -9 672.80 -71.2 -60.8 -70.6 69 -99 SPO 1997 04 25 04 16 92 2.5 -9 672.90 -71.3 -61.1 -70.7 68 -99 SPO 1997 04 25 04 17 93 2.5 -9 672.90 -71.4 -61.6 -70.8 67 -99 SPO 1997 04 25 04 18 92 2.6 -9 672.90 -71.5 -61.8 -70.9 68 -99 SPO 1997 04 25 04 19 91 2.6 -9 672.80 -71.6 -61.9 -71.0 69 -99 SPO 1997 04 25 04 20 87 2.7 -9 672.80 -71.7 -61.6 -71.0 69 -99 SPO 1997 04 25 04 21 87 2.7 -9 672.80 -71.7 -61.2 -71.0 68 -99 SPO 1997 04 25 04 22 88 2.7 -9 672.90 -71.6 -61.1 -71.1 67 -99 SPO 1997 04 25 04 23 90 2.6 -9 672.90 -71.6 -61.0 -71.0 66 -99 SPO 1997 04 25 04 24 89 2.6 -9 672.80 -71.4 -61.0 -71.0 64 -99 SPO 1997 04 25 04 25 89 2.5 -9 672.80 -71.4 -61.0 -71.0 64 -99 SPO 1997 04 25 04 26 89 2.5 -9 672.80 -71.4 -61.1 -71.0 63 -99 SPO 1997 04 25 04 27 89 2.5 -9 672.90 -71.4 -61.3 -71.1 63 -99 SPO 1997 04 25 04 28 88 2.5 -9 672.90 -71.4 -61.2 -71.1 62 -99 SPO 1997 04 25 04 29 87 2.6 -9 672.80 -71.5 -61.2 -71.2 63 -99 SPO 1997 04 25 04 30 86 2.8 -9 672.80 -71.5 -61.3 -71.2 63 -99 SPO 1997 04 25 04 31 85 2.9 -9 672.80 -71.6 -61.4 -71.2 64 -99 SPO 1997 04 25 04 32 84 2.9 -9 672.80 -71.6 -61.3 -71.3 64 -99 SPO 1997 04 25 04 33 85 2.8 -9 672.80 -71.5 -61.3 -71.3 63 -99 SPO 1997 04 25 04 34 84 2.8 -9 672.90 -71.4 -61.1 -71.2 62 -99 SPO 1997 04 25 04 35 84 2.8 -9 672.90 -71.4 -61.5 -71.2 62 -99 SPO 1997 04 25 04 36 83 2.9 -9 672.80 -71.4 -62.0 -71.3 62 -99 SPO 1997 04 25 04 37 82 3.0 -9 672.80 -71.4 -62.4 -71.3 61 -99 SPO 1997 04 25 04 38 82 3.1 -9 672.80 -71.4 -62.6 -71.3 60 -99 SPO 1997 04 25 04 39 82 3.2 -9 672.70 -71.4 -62.5 -71.3 60 -99 SPO 1997 04 25 04 40 81 3.3 -9 672.70 -71.3 -62.5 -71.3 60 -99 SPO 1997 04 25 04 41 81 3.2 -9 672.70 -71.2 -62.5 -71.2 60 -99 SPO 1997 04 25 04 42 81 3.1 -9 672.80 -71.1 -62.4 -71.2 59 -99 SPO 1997 04 25 04 43 81 3.0 -9 672.80 -71.0 -62.7 -71.1 59 -99 SPO 1997 04 25 04 44 80 3.0 -9 672.80 -70.9 -63.0 -71.1 59 -99 SPO 1997 04 25 04 45 80 2.9 -9 672.80 -70.9 -63.1 -71.0 60 -99 SPO 1997 04 25 04 46 80 2.9 -9 672.80 -70.8 -63.2 -71.0 59 -99 SPO 1997 04 25 04 47 81 2.9 -9 672.80 -70.8 -63.2 -71.0 59 -99 SPO 1997 04 25 04 48 83 2.8 -9 672.80 -70.9 -63.3 -71.1 58 -99 SPO 1997 04 25 04 49 85 2.8 -9 672.80 -71.0 -63.4 -71.1 60 -99 SPO 1997 04 25 04 50 86 2.8 -9 672.80 -71.0 -63.4 -71.1 60 -99 SPO 1997 04 25 04 51 87 2.7 -9 672.90 -71.0 -63.4 -71.1 61 -99 SPO 1997 04 25 04 52 89 2.6 -9 672.90 -71.0 -63.4 -71.1 62 -99 SPO 1997 04 25 04 53 89 2.4 -9 672.90 -71.0 -63.5 -71.1 62 -99 SPO 1997 04 25 04 54 89 2.3 -9 672.90 -71.0 -63.6 -71.1 62 -99 SPO 1997 04 25 04 55 89 2.2 -9 672.90 -70.9 -63.6 -71.1 61 -99 SPO 1997 04 25 04 56 88 2.2 -9 672.90 -70.9 -63.6 -71.0 61 -99 SPO 1997 04 25 04 57 86 2.3 -9 672.90 -71.0 -63.5 -71.1 61 -99 SPO 1997 04 25 04 58 83 2.4 -9 672.90 -71.1 -63.5 -71.1 61 -99 SPO 1997 04 25 04 59 79 2.5 -9 672.90 -71.2 -63.3 -71.2 61 -99 SPO 1997 04 25 05 00 79 2.5 -9 672.90 -71.3 -63.2 -71.2 61 0 SPO 1997 04 25 05 01 79 2.5 -9 672.90 -71.4 -63.2 -71.2 62 -99 SPO 1997 04 25 05 02 79 2.5 -9 672.90 -71.5 -63.1 -71.3 63 -99 SPO 1997 04 25 05 03 79 2.5 -9 672.90 -71.5 -63.0 -71.3 61 -99 SPO 1997 04 25 05 04 79 2.6 -9 672.90 -71.4 -62.9 -71.3 60 -99 SPO 1997 04 25 05 05 79 2.7 -9 672.90 -71.3 -62.8 -71.3 60 -99 SPO 1997 04 25 05 06 79 2.7 -9 672.80 -71.2 -62.6 -71.2 60 -99 SPO 1997 04 25 05 07 80 2.7 -9 672.80 -71.2 -62.3 -71.1 60 -99 SPO 1997 04 25 05 08 81 2.6 -9 672.90 -71.0 -61.9 -71.1 59 -99 SPO 1997 04 25 05 09 83 2.4 -9 672.90 -70.9 -61.8 -71.0 58 -99 SPO 1997 04 25 05 10 85 2.3 -9 672.90 -70.8 -62.0 -71.0 57 -99 SPO 1997 04 25 05 11 86 2.3 -9 672.90 -70.7 -62.2 -70.9 57 -99 SPO 1997 04 25 05 12 87 2.4 -9 672.90 -70.6 -62.3 -70.8 57 -99 SPO 1997 04 25 05 13 88 2.4 -9 672.90 -70.6 -62.2 -70.8 58 -99 SPO 1997 04 25 05 14 86 2.5 -9 672.90 -70.8 -62.0 -70.8 61 -99 SPO 1997 04 25 05 15 86 2.5 -9 672.90 -70.9 -62.0 -70.9 61 -99 SPO 1997 04 25 05 16 87 2.4 -9 672.90 -70.9 -62.0 -70.9 62 -99 SPO 1997 04 25 05 17 87 2.5 -9 672.90 -70.9 -61.9 -70.9 62 -99 SPO 1997 04 25 05 18 88 2.5 -9 672.90 -70.8 -61.7 -70.9 61 -99 SPO 1997 04 25 05 19 90 2.5 -9 672.90 -70.8 -61.6 -70.9 62 -99 SPO 1997 04 25 05 20 90 2.6 -9 672.90 -70.8 -61.7 -70.9 62 -99 SPO 1997 04 25 05 21 90 2.6 -9 672.90 -70.9 -61.8 -70.9 62 -99 SPO 1997 04 25 05 22 90 2.6 -9 672.90 -70.9 -62.0 -70.9 61 -99 SPO 1997 04 25 05 23 89 2.5 -9 672.90 -70.8 -62.1 -70.9 61 -99 SPO 1997 04 25 05 24 89 2.5 -9 672.90 -70.7 -62.3 -70.8 60 -99 SPO 1997 04 25 05 25 87 2.6 -9 672.90 -70.6 -62.5 -70.8 59 -99 SPO 1997 04 25 05 26 86 2.6 -9 672.90 -70.6 -62.6 -70.8 60 -99 SPO 1997 04 25 05 27 84 2.6 -9 672.90 -70.6 -62.7 -70.8 61 -99 SPO 1997 04 25 05 28 83 2.6 -9 672.90 -70.6 -62.8 -70.7 61 -99 SPO 1997 04 25 05 29 83 2.6 -9 672.90 -70.5 -62.8 -70.7 61 -99 SPO 1997 04 25 05 30 83 2.6 -9 672.90 -70.4 -62.7 -70.7 61 -99 SPO 1997 04 25 05 31 85 2.5 -9 673.00 -70.4 -62.7 -70.6 62 -99 SPO 1997 04 25 05 32 87 2.4 -9 673.00 -70.4 -62.7 -70.6 62 -99 SPO 1997 04 25 05 33 88 2.4 -9 673.00 -70.4 -62.6 -70.6 62 -99 SPO 1997 04 25 05 34 88 2.4 -9 673.00 -70.4 -62.5 -70.6 62 -99 SPO 1997 04 25 05 35 90 2.4 -9 673.00 -70.4 -62.5 -70.6 62 -99 SPO 1997 04 25 05 36 90 2.5 -9 672.90 -70.3 -62.5 -70.5 61 -99 SPO 1997 04 25 05 37 89 2.5 -9 672.90 -70.2 -62.4 -70.5 61 -99 SPO 1997 04 25 05 38 89 2.4 -9 672.90 -70.1 -62.1 -70.4 60 -99 SPO 1997 04 25 05 39 90 2.4 -9 672.90 -70.1 -62.0 -70.4 61 -99 SPO 1997 04 25 05 40 90 2.4 -9 672.90 -70.1 -62.2 -70.3 61 -99 SPO 1997 04 25 05 41 90 2.5 -9 672.90 -70.0 -62.2 -70.3 61 -99 SPO 1997 04 25 05 42 90 2.5 -9 672.90 -70.0 -62.2 -70.3 62 -99 SPO 1997 04 25 05 43 89 2.6 -9 672.90 -70.0 -62.3 -70.3 63 -99 SPO 1997 04 25 05 44 85 2.6 -9 672.90 -70.0 -62.4 -70.2 63 -99 SPO 1997 04 25 05 45 83 2.7 -9 672.80 -70.0 -62.4 -70.2 63 -99 SPO 1997 04 25 05 46 83 2.7 -9 672.80 -70.0 -62.4 -70.2 63 -99 SPO 1997 04 25 05 47 83 2.8 -9 672.80 -69.9 -62.4 -70.2 62 -99 SPO 1997 04 25 05 48 83 2.8 -9 672.90 -69.9 -62.5 -70.2 62 -99 SPO 1997 04 25 05 49 82 2.9 -9 672.80 -70.0 -62.5 -70.2 63 -99 SPO 1997 04 25 05 50 83 2.9 -9 672.80 -70.0 -62.4 -70.2 62 -99 SPO 1997 04 25 05 51 85 3.0 -9 672.80 -70.0 -62.4 -70.2 63 -99 SPO 1997 04 25 05 52 86 3.0 -9 672.90 -70.0 -62.5 -70.2 63 -99 SPO 1997 04 25 05 53 86 2.9 -9 672.90 -70.1 -62.7 -70.2 65 -99 SPO 1997 04 25 05 54 87 2.9 -9 672.90 -70.1 -62.9 -70.2 65 -99 SPO 1997 04 25 05 55 87 2.9 -9 672.90 -70.1 -63.0 -70.2 65 -99 SPO 1997 04 25 05 56 87 2.9 -9 672.90 -70.1 -63.0 -70.2 64 -99 SPO 1997 04 25 05 57 87 2.9 -9 672.90 -70.1 -63.0 -70.2 64 -99 SPO 1997 04 25 05 58 87 2.9 -9 672.90 -70.1 -63.0 -70.2 64 -99 SPO 1997 04 25 05 59 87 2.9 -9 672.80 -70.2 -63.0 -70.3 65 -99 SPO 1997 04 25 06 00 86 2.9 -9 672.80 -70.2 -62.9 -70.3 64 0 SPO 1997 04 25 06 01 85 2.8 -9 672.80 -70.2 -62.9 -70.3 64 -99 SPO 1997 04 25 06 02 85 2.7 -9 672.80 -70.3 -62.8 -70.3 65 -99 SPO 1997 04 25 06 03 86 2.7 -9 672.80 -70.3 -62.8 -70.3 65 -99 SPO 1997 04 25 06 04 85 2.7 -9 672.80 -70.3 -62.8 -70.3 65 -99 SPO 1997 04 25 06 05 85 2.7 -9 672.80 -70.4 -62.8 -70.3 65 -99 SPO 1997 04 25 06 06 85 2.8 -9 672.80 -70.4 -62.9 -70.4 65 -99 SPO 1997 04 25 06 07 83 2.9 -9 672.80 -70.5 -62.9 -70.4 66 -99 SPO 1997 04 25 06 08 82 2.9 -9 672.70 -70.6 -63.0 -70.4 66 -99 SPO 1997 04 25 06 09 81 2.9 -9 672.80 -70.6 -63.0 -70.4 65 -99 SPO 1997 04 25 06 10 81 2.7 -9 672.80 -70.6 -63.1 -70.5 65 -99 SPO 1997 04 25 06 11 82 2.6 -9 672.90 -70.6 -63.2 -70.4 65 -99 SPO 1997 04 25 06 12 83 2.5 -9 672.90 -70.5 -63.2 -70.4 64 -99 SPO 1997 04 25 06 13 83 2.5 -9 672.90 -70.5 -63.2 -70.4 64 -99 SPO 1997 04 25 06 14 82 2.5 -9 672.90 -70.5 -63.2 -70.4 64 -99 SPO 1997 04 25 06 15 81 2.7 -9 672.80 -70.5 -63.3 -70.4 65 -99 SPO 1997 04 25 06 16 81 2.8 -9 672.80 -70.4 -63.2 -70.4 64 -99 SPO 1997 04 25 06 17 81 2.7 -9 672.80 -70.5 -63.2 -70.4 65 -99 SPO 1997 04 25 06 18 84 2.7 -9 672.80 -70.4 -63.2 -70.4 64 -99 SPO 1997 04 25 06 19 86 2.6 -9 672.90 -70.4 -63.3 -70.4 63 -99 SPO 1997 04 25 06 20 86 2.7 -9 672.80 -70.3 -63.3 -70.3 62 -99 SPO 1997 04 25 06 21 84 2.7 -9 672.80 -70.3 -63.3 -70.3 63 -99 SPO 1997 04 25 06 22 84 2.7 -9 672.80 -70.3 -63.3 -70.3 63 -99 SPO 1997 04 25 06 23 85 2.6 -9 672.70 -70.3 -63.3 -70.3 63 -99 SPO 1997 04 25 06 24 85 2.6 -9 672.80 -70.4 -63.3 -70.4 64 -99 SPO 1997 04 25 06 25 87 2.6 -9 672.80 -70.5 -63.3 -70.4 64 -99 SPO 1997 04 25 06 26 86 2.6 -9 672.80 -70.5 -63.4 -70.4 64 -99 SPO 1997 04 25 06 27 88 2.6 -9 672.80 -70.6 -63.3 -70.5 65 -99 SPO 1997 04 25 06 28 86 2.7 -9 672.80 -70.6 -63.3 -70.5 65 -99 SPO 1997 04 25 06 29 84 2.7 -9 672.80 -70.6 -63.2 -70.5 64 -99 SPO 1997 04 25 06 30 83 2.8 -9 672.80 -70.6 -63.0 -70.5 64 -99 SPO 1997 04 25 06 31 84 2.7 -9 672.80 -70.4 -62.9 -70.4 62 -99 SPO 1997 04 25 06 32 85 2.8 -9 672.80 -70.4 -62.9 -70.4 61 -99 SPO 1997 04 25 06 33 86 2.7 -9 672.80 -70.3 -62.8 -70.3 61 -99 SPO 1997 04 25 06 34 88 2.7 -9 672.80 -70.3 -62.9 -70.3 61 -99 SPO 1997 04 25 06 35 90 2.7 -9 672.80 -70.3 -63.0 -70.3 62 -99 SPO 1997 04 25 06 36 97 2.5 -9 672.90 -70.4 -63.1 -70.4 63 -99 SPO 1997 04 25 06 37 101 2.3 -9 672.90 -70.3 -63.4 -70.4 63 -99 SPO 1997 04 25 06 38 100 2.2 -9 672.90 -70.3 -63.5 -70.4 64 -99 SPO 1997 04 25 06 39 92 2.3 -9 672.90 -70.4 -63.4 -70.4 65 -99 SPO 1997 04 25 06 40 93 2.3 -9 672.90 -70.4 -63.5 -70.4 65 -99 SPO 1997 04 25 06 41 90 2.3 -9 672.90 -70.5 -63.5 -70.5 66 -99 SPO 1997 04 25 06 42 89 2.3 -9 672.90 -70.6 -63.4 -70.5 66 -99 SPO 1997 04 25 06 43 90 2.3 -9 672.90 -70.7 -63.3 -70.6 66 -99 SPO 1997 04 25 06 44 91 2.2 -9 672.90 -70.8 -63.4 -70.6 66 -99 SPO 1997 04 25 06 45 92 2.2 -9 672.90 -70.9 -63.6 -70.7 65 -99 SPO 1997 04 25 06 46 90 2.3 -9 672.90 -70.9 -63.6 -70.7 64 -99 SPO 1997 04 25 06 47 89 2.3 -9 672.90 -71.0 -63.8 -70.8 64 -99 SPO 1997 04 25 06 48 88 2.4 -9 672.90 -71.0 -63.9 -70.8 65 -99 SPO 1997 04 25 06 49 89 2.4 -9 672.90 -70.9 -64.0 -70.8 64 -99 SPO 1997 04 25 06 50 90 2.4 -9 672.90 -70.9 -64.0 -70.8 65 -99 SPO 1997 04 25 06 51 90 2.4 -9 672.90 -70.8 -64.0 -70.8 64 -99 SPO 1997 04 25 06 52 91 2.4 -9 672.90 -70.8 -64.0 -70.7 64 -99 SPO 1997 04 25 06 53 91 2.5 -9 672.90 -70.7 -63.9 -70.7 63 -99 SPO 1997 04 25 06 54 92 2.5 -9 672.90 -70.6 -63.9 -70.7 62 -99 SPO 1997 04 25 06 55 94 2.5 -9 672.90 -70.6 -63.9 -70.7 62 -99 SPO 1997 04 25 06 56 95 2.5 -9 672.90 -70.6 -63.9 -70.6 62 -99 SPO 1997 04 25 06 57 96 2.5 -9 672.90 -70.5 -64.0 -70.6 61 -99 SPO 1997 04 25 06 58 95 2.5 -9 672.90 -70.4 -64.0 -70.6 61 -99 SPO 1997 04 25 06 59 94 2.5 -9 672.90 -70.4 -63.9 -70.6 61 -99 SPO 1997 04 25 07 00 92 2.4 -9 672.90 -70.4 -63.8 -70.5 61 0 SPO 1997 04 25 07 01 93 2.4 -9 672.90 -70.5 -63.9 -70.6 63 -99 SPO 1997 04 25 07 02 94 2.5 -9 672.90 -70.5 -64.0 -70.6 63 -99 SPO 1997 04 25 07 03 94 2.6 -9 672.90 -70.5 -64.0 -70.6 64 -99 SPO 1997 04 25 07 04 93 2.6 -9 672.90 -70.5 -63.9 -70.6 64 -99 SPO 1997 04 25 07 05 91 2.6 -9 672.90 -70.4 -63.8 -70.6 63 -99 SPO 1997 04 25 07 06 89 2.6 -9 672.90 -70.4 -63.6 -70.6 63 -99 SPO 1997 04 25 07 07 85 2.6 -9 672.80 -70.3 -63.6 -70.5 62 -99 SPO 1997 04 25 07 08 82 2.8 -9 672.80 -70.2 -63.3 -70.4 61 -99 SPO 1997 04 25 07 09 81 2.9 -9 672.80 -70.0 -63.1 -70.2 60 -99 SPO 1997 04 25 07 10 82 2.9 -9 672.80 -70.0 -63.0 -70.2 61 -99 SPO 1997 04 25 07 11 83 2.7 -9 672.90 -69.9 -63.0 -70.2 60 -99 SPO 1997 04 25 07 12 84 2.7 -9 672.90 -69.8 -63.1 -70.1 60 -99 SPO 1997 04 25 07 13 83 2.7 -9 672.90 -69.7 -63.0 -70.1 60 -99 SPO 1997 04 25 07 14 83 2.8 -9 672.90 -69.7 -63.0 -70.0 62 -99 SPO 1997 04 25 07 15 81 2.8 -9 672.90 -69.6 -63.1 -70.0 61 -99 SPO 1997 04 25 07 16 78 2.9 -9 672.80 -69.6 -63.0 -70.0 62 -99 SPO 1997 04 25 07 17 77 2.9 -9 672.80 -69.6 -62.9 -69.9 62 -99 SPO 1997 04 25 07 18 78 2.9 -9 672.90 -69.6 -63.0 -69.8 62 -99 SPO 1997 04 25 07 19 77 2.9 -9 672.80 -69.5 -63.1 -69.8 62 -99 SPO 1997 04 25 07 20 77 2.9 -9 672.80 -69.4 -63.0 -69.6 61 -99 SPO 1997 04 25 07 21 78 2.8 -9 672.80 -69.3 -63.0 -69.6 61 -99 SPO 1997 04 25 07 22 77 2.8 -9 672.90 -69.2 -63.2 -69.6 61 -99 SPO 1997 04 25 07 23 77 2.8 -9 672.90 -69.1 -63.2 -69.5 62 -99 SPO 1997 04 25 07 24 78 2.7 -9 672.90 -69.0 -63.2 -69.4 62 -99 SPO 1997 04 25 07 25 76 2.7 -9 672.90 -69.0 -63.0 -69.4 62 -99 SPO 1997 04 25 07 26 77 2.7 -9 672.90 -68.9 -63.0 -69.4 62 -99 SPO 1997 04 25 07 27 77 2.8 -9 672.90 -68.9 -62.8 -69.3 63 -99 SPO 1997 04 25 07 28 77 2.7 -9 673.00 -68.8 -62.8 -69.3 62 -99 SPO 1997 04 25 07 29 76 2.7 -9 673.00 -68.8 -62.8 -69.3 62 -99 SPO 1997 04 25 07 30 75 2.7 -9 673.00 -68.9 -62.8 -69.3 63 -99 SPO 1997 04 25 07 31 76 2.6 -9 673.00 -68.9 -62.9 -69.3 63 -99 SPO 1997 04 25 07 32 76 2.6 -9 672.90 -69.0 -63.0 -69.3 63 -99 SPO 1997 04 25 07 33 76 2.7 -9 672.90 -69.0 -62.9 -69.3 63 -99 SPO 1997 04 25 07 34 76 2.7 -9 672.90 -69.0 -62.9 -69.3 63 -99 SPO 1997 04 25 07 35 77 2.7 -9 672.90 -69.0 -62.9 -69.3 64 -99 SPO 1997 04 25 07 36 78 2.7 -9 672.90 -69.1 -63.0 -69.3 65 -99 SPO 1997 04 25 07 37 80 2.6 -9 673.00 -69.2 -63.2 -69.3 66 -99 SPO 1997 04 25 07 38 85 2.6 -9 673.00 -69.2 -63.4 -69.4 66 -99 SPO 1997 04 25 07 39 87 2.7 -9 673.00 -69.2 -63.5 -69.3 65 -99 SPO 1997 04 25 07 40 87 2.8 -9 673.00 -69.2 -63.5 -69.4 64 -99 SPO 1997 04 25 07 41 86 2.8 -9 672.90 -69.3 -63.5 -69.4 65 -99 SPO 1997 04 25 07 42 87 2.7 -9 672.90 -69.3 -63.6 -69.4 64 -99 SPO 1997 04 25 07 43 87 2.7 -9 672.90 -69.3 -63.6 -69.4 64 -99 SPO 1997 04 25 07 44 86 2.7 -9 672.90 -69.2 -63.7 -69.4 64 -99 SPO 1997 04 25 07 45 87 2.7 -9 672.90 -69.2 -63.7 -69.3 64 -99 SPO 1997 04 25 07 46 91 2.6 -9 672.90 -69.2 -63.8 -69.4 65 -99 SPO 1997 04 25 07 47 92 2.6 -9 672.90 -69.4 -63.9 -69.4 67 -99 SPO 1997 04 25 07 48 92 2.6 -9 672.90 -69.8 -64.0 -69.6 70 -99 SPO 1997 04 25 07 49 93 2.5 -9 672.90 -70.3 -64.1 -69.9 72 -99 SPO 1997 04 25 07 50 95 2.5 -9 672.90 -70.7 -64.2 -70.2 74 -99 SPO 1997 04 25 07 51 98 2.3 -9 672.90 -70.9 -64.3 -70.3 72 -99 SPO 1997 04 25 07 52 100 2.3 -9 673.00 -70.9 -64.4 -70.4 70 -99 SPO 1997 04 25 07 53 97 2.4 -9 673.00 -70.8 -64.4 -70.4 68 -99 SPO 1997 04 25 07 54 95 2.4 -9 673.00 -70.7 -64.5 -70.3 66 -99 SPO 1997 04 25 07 55 98 2.3 -9 673.00 -70.7 -64.6 -70.3 66 -99 SPO 1997 04 25 07 56 95 2.3 -9 673.00 -70.7 -64.6 -70.3 66 -99 SPO 1997 04 25 07 57 94 2.3 -9 673.00 -70.6 -64.6 -70.3 65 -99 SPO 1997 04 25 07 58 94 2.3 -9 673.00 -70.6 -64.5 -70.3 66 -99 SPO 1997 04 25 07 59 92 2.5 -9 673.00 -70.6 -64.5 -70.3 66 -99 SPO 1997 04 25 08 00 90 2.6 -9 673.00 -70.4 -64.4 -70.2 65 0 SPO 1997 04 25 08 01 90 2.6 -9 673.00 -70.3 -64.3 -70.2 64 -99 SPO 1997 04 25 08 02 92 2.6 -9 672.90 -70.3 -64.3 -70.2 64 -99 SPO 1997 04 25 08 03 92 2.7 -9 672.90 -70.2 -64.2 -70.2 63 -99 SPO 1997 04 25 08 04 92 2.8 -9 672.90 -70.1 -64.2 -70.2 62 -99 SPO 1997 04 25 08 05 94 2.7 -9 672.90 -70.1 -64.2 -70.2 62 -99 SPO 1997 04 25 08 06 97 2.5 -9 673.00 -70.1 -64.3 -70.1 61 -99 SPO 1997 04 25 08 07 99 2.4 -9 673.00 -70.2 -64.4 -70.2 62 -99 SPO 1997 04 25 08 08 96 2.5 -9 673.00 -70.4 -64.5 -70.3 64 -99 SPO 1997 04 25 08 09 96 2.5 -9 673.00 -70.4 -64.6 -70.3 64 -99 SPO 1997 04 25 08 10 98 2.5 -9 673.00 -70.5 -64.6 -70.4 65 -99 SPO 1997 04 25 08 11 97 2.6 -9 672.90 -70.6 -64.6 -70.4 66 -99 SPO 1997 04 25 08 12 96 2.6 -9 672.90 -70.6 -64.6 -70.5 65 -99 SPO 1997 04 25 08 13 97 2.6 -9 672.90 -70.6 -64.6 -70.5 65 -99 SPO 1997 04 25 08 14 98 2.5 -9 672.90 -70.6 -64.6 -70.5 65 -99 SPO 1997 04 25 08 15 97 2.6 -9 672.90 -70.5 -64.6 -70.4 63 -99 SPO 1997 04 25 08 16 97 2.7 -9 672.90 -70.4 -64.4 -70.4 62 -99 SPO 1997 04 25 08 17 96 2.8 -9 672.90 -70.4 -64.4 -70.4 63 -99 SPO 1997 04 25 08 18 96 2.8 -9 672.90 -70.4 -64.3 -70.4 63 -99 SPO 1997 04 25 08 19 94 2.8 -9 672.90 -70.3 -64.3 -70.4 62 -99 SPO 1997 04 25 08 20 93 2.8 -9 672.90 -70.3 -64.3 -70.3 62 -99 SPO 1997 04 25 08 21 92 2.9 -9 672.90 -70.3 -64.4 -70.3 63 -99 SPO 1997 04 25 08 22 92 2.9 -9 672.90 -70.3 -64.4 -70.3 64 -99 SPO 1997 04 25 08 23 92 3.0 -9 672.90 -70.3 -64.4 -70.3 64 -99 SPO 1997 04 25 08 24 92 3.0 -9 672.90 -70.3 -64.4 -70.3 65 -99 SPO 1997 04 25 08 25 92 3.1 -9 672.90 -70.2 -64.5 -70.3 63 -99 SPO 1997 04 25 08 26 93 3.0 -9 672.90 -70.1 -64.5 -70.3 62 -99 SPO 1997 04 25 08 27 94 3.0 -9 672.90 -70.0 -64.4 -70.2 61 -99 SPO 1997 04 25 08 28 94 2.9 -9 672.90 -70.0 -64.4 -70.2 61 -99 SPO 1997 04 25 08 29 93 2.9 -9 672.90 -69.9 -64.4 -70.2 62 -99 SPO 1997 04 25 08 30 93 2.9 -9 672.90 -69.9 -64.3 -70.2 62 -99 SPO 1997 04 25 08 31 93 2.8 -9 672.90 -69.8 -64.2 -70.1 61 -99 SPO 1997 04 25 08 32 95 2.8 -9 672.90 -69.8 -64.1 -70.1 62 -99 SPO 1997 04 25 08 33 95 2.7 -9 672.90 -69.8 -64.1 -70.1 62 -99 SPO 1997 04 25 08 34 94 2.8 -9 672.90 -69.9 -64.1 -70.1 63 -99 SPO 1997 04 25 08 35 94 2.8 -9 672.90 -70.0 -64.2 -70.2 64 -99 SPO 1997 04 25 08 36 93 2.8 -9 672.90 -70.1 -64.2 -70.2 65 -99 SPO 1997 04 25 08 37 94 2.7 -9 672.90 -70.2 -64.2 -70.3 65 -99 SPO 1997 04 25 08 38 95 2.6 -9 672.90 -70.3 -64.2 -70.3 65 -99 SPO 1997 04 25 08 39 94 2.6 -9 672.90 -70.3 -64.2 -70.4 65 -99 SPO 1997 04 25 08 40 92 2.7 -9 672.90 -70.4 -64.2 -70.4 65 -99 SPO 1997 04 25 08 41 92 2.7 -9 672.90 -70.6 -64.2 -70.5 66 -99 SPO 1997 04 25 08 42 92 2.7 -9 672.90 -70.6 -64.3 -70.5 65 -99 SPO 1997 04 25 08 43 91 2.7 -9 672.90 -70.7 -64.2 -70.6 66 -99 SPO 1997 04 25 08 44 88 2.9 -9 672.80 -70.7 -64.1 -70.6 65 -99 SPO 1997 04 25 08 45 87 2.9 -9 672.80 -70.7 -64.0 -70.6 65 -99 SPO 1997 04 25 08 46 87 2.8 -9 672.80 -70.7 -64.0 -70.6 64 -99 SPO 1997 04 25 08 47 88 2.7 -9 672.90 -70.7 -64.1 -70.6 64 -99 SPO 1997 04 25 08 48 88 2.6 -9 672.90 -70.7 -64.1 -70.6 63 -99 SPO 1997 04 25 08 49 90 2.6 -9 672.90 -70.6 -64.1 -70.6 62 -99 SPO 1997 04 25 08 50 90 2.7 -9 672.90 -70.6 -64.2 -70.6 62 -99 SPO 1997 04 25 08 51 90 2.8 -9 672.90 -70.6 -64.1 -70.6 62 -99 SPO 1997 04 25 08 52 90 2.8 -9 672.80 -70.6 -64.0 -70.6 62 -99 SPO 1997 04 25 08 53 91 2.8 -9 672.80 -70.6 -64.0 -70.6 62 -99 SPO 1997 04 25 08 54 91 2.8 -9 672.90 -70.6 -64.0 -70.6 62 -99 SPO 1997 04 25 08 55 91 2.8 -9 672.90 -70.5 -64.1 -70.5 62 -99 SPO 1997 04 25 08 56 91 2.8 -9 672.80 -70.5 -64.1 -70.5 63 -99 SPO 1997 04 25 08 57 90 2.8 -9 672.80 -70.4 -64.0 -70.5 62 -99 SPO 1997 04 25 08 58 89 2.8 -9 672.80 -70.4 -64.0 -70.5 62 -99 SPO 1997 04 25 08 59 89 2.7 -9 672.80 -70.3 -63.9 -70.4 61 -99 SPO 1997 04 25 09 00 89 2.7 -9 672.80 -70.3 -63.8 -70.4 61 0 SPO 1997 04 25 09 01 89 2.7 -9 672.80 -70.2 -63.8 -70.4 60 -99 SPO 1997 04 25 09 02 89 2.7 -9 672.80 -70.2 -63.8 -70.4 60 -99 SPO 1997 04 25 09 03 89 2.7 -9 672.80 -70.2 -63.8 -70.4 60 -99 SPO 1997 04 25 09 04 89 2.7 -9 672.80 -70.2 -63.8 -70.4 61 -99 SPO 1997 04 25 09 05 89 2.7 -9 672.80 -70.3 -63.7 -70.4 61 -99 SPO 1997 04 25 09 06 90 2.7 -9 672.80 -70.3 -63.7 -70.4 62 -99 SPO 1997 04 25 09 07 90 2.7 -9 672.80 -70.2 -63.6 -70.4 61 -99 SPO 1997 04 25 09 08 91 2.5 -9 672.80 -70.3 -63.6 -70.4 63 -99 SPO 1997 04 25 09 09 91 2.4 -9 672.80 -70.3 -63.7 -70.4 63 -99 SPO 1997 04 25 09 10 92 2.3 -9 672.80 -70.3 -63.8 -70.4 63 -99 SPO 1997 04 25 09 11 91 2.3 -9 672.90 -70.3 -63.8 -70.4 62 -99 SPO 1997 04 25 09 12 91 2.2 -9 672.90 -70.3 -63.8 -70.4 62 -99 SPO 1997 04 25 09 13 92 2.1 -9 672.90 -70.3 -63.8 -70.4 62 -99 SPO 1997 04 25 09 14 94 2.1 -9 672.90 -70.3 -63.8 -70.4 61 -99 SPO 1997 04 25 09 15 98 2.0 -9 672.90 -70.3 -63.9 -70.4 61 -99 SPO 1997 04 25 09 16 99 2.0 -9 673.00 -70.2 -64.0 -70.3 61 -99 SPO 1997 04 25 09 17 98 2.1 -9 672.90 -70.2 -64.0 -70.2 62 -99 SPO 1997 04 25 09 18 95 2.2 -9 672.90 -70.1 -64.0 -70.2 61 -99 SPO 1997 04 25 09 19 90 2.3 -9 672.90 -70.2 -64.1 -70.1 62 -99 SPO 1997 04 25 09 20 89 2.4 -9 672.90 -70.3 -63.9 -70.2 63 -99 SPO 1997 04 25 09 21 89 2.4 -9 672.90 -70.4 -63.8 -70.2 64 -99 SPO 1997 04 25 09 22 90 2.4 -9 672.90 -70.4 -63.8 -70.2 63 -99 SPO 1997 04 25 09 23 90 2.3 -9 672.90 -70.5 -63.8 -70.3 63 -99 SPO 1997 04 25 09 24 90 2.3 -9 672.90 -70.5 -63.7 -70.4 63 -99 SPO 1997 04 25 09 25 91 2.4 -9 672.90 -70.5 -63.6 -70.4 63 -99 SPO 1997 04 25 09 26 91 2.4 -9 672.90 -70.4 -63.6 -70.4 62 -99 SPO 1997 04 25 09 27 90 2.5 -9 672.80 -70.4 -63.5 -70.3 61 -99 SPO 1997 04 25 09 28 89 2.6 -9 672.80 -70.4 -63.5 -70.3 61 -99 SPO 1997 04 25 09 29 87 2.7 -9 672.80 -70.3 -63.5 -70.3 61 -99 SPO 1997 04 25 09 30 86 2.8 -9 672.70 -70.2 -63.4 -70.2 61 -99 SPO 1997 04 25 09 31 86 2.8 -9 672.70 -70.1 -63.3 -70.2 61 -99 SPO 1997 04 25 09 32 86 2.8 -9 672.70 -69.9 -63.3 -70.1 60 -99 SPO 1997 04 25 09 33 86 2.8 -9 672.70 -69.8 -63.4 -70.0 61 -99 SPO 1997 04 25 09 34 86 2.8 -9 672.70 -69.7 -63.4 -70.0 61 -99 SPO 1997 04 25 09 35 88 2.7 -9 672.80 -69.6 -63.5 -70.0 61 -99 SPO 1997 04 25 09 36 90 2.7 -9 672.80 -69.6 -63.5 -69.9 61 -99 SPO 1997 04 25 09 37 94 2.6 -9 672.80 -69.5 -63.6 -69.9 61 -99 SPO 1997 04 25 09 38 98 2.6 -9 672.90 -69.5 -63.8 -69.9 61 -99 SPO 1997 04 25 09 39 101 2.6 -9 672.90 -69.5 -63.9 -69.9 62 -99 SPO 1997 04 25 09 40 101 2.6 -9 672.80 -69.6 -64.0 -69.9 62 -99 SPO 1997 04 25 09 41 100 2.7 -9 672.80 -69.8 -64.1 -69.9 64 -99 SPO 1997 04 25 09 42 99 2.7 -9 672.80 -69.8 -64.1 -70.0 64 -99 SPO 1997 04 25 09 43 98 2.7 -9 672.70 -69.9 -64.1 -70.0 65 -99 SPO 1997 04 25 09 44 97 2.7 -9 672.70 -70.0 -64.1 -70.1 66 -99 SPO 1997 04 25 09 45 96 2.7 -9 672.70 -70.1 -64.0 -70.1 66 -99 SPO 1997 04 25 09 46 96 2.7 -9 672.70 -70.2 -63.8 -70.2 66 -99 SPO 1997 04 25 09 47 96 2.5 -9 672.80 -70.4 -63.8 -70.2 67 -99 SPO 1997 04 25 09 48 96 2.4 -9 672.80 -70.5 -63.8 -70.3 67 -99 SPO 1997 04 25 09 49 97 2.3 -9 672.80 -70.6 -63.8 -70.4 66 -99 SPO 1997 04 25 09 50 96 2.3 -9 672.80 -70.6 -63.6 -70.4 65 -99 SPO 1997 04 25 09 51 97 2.3 -9 672.80 -70.6 -63.6 -70.4 65 -99 SPO 1997 04 25 09 52 97 2.4 -9 672.80 -70.7 -63.4 -70.4 66 -99 SPO 1997 04 25 09 53 97 2.5 -9 672.80 -70.6 -63.3 -70.4 65 -99 SPO 1997 04 25 09 54 96 2.6 -9 672.80 -70.6 -63.3 -70.4 64 -99 SPO 1997 04 25 09 55 96 2.6 -9 672.80 -70.6 -63.2 -70.4 64 -99 SPO 1997 04 25 09 56 95 2.6 -9 672.80 -70.5 -63.2 -70.3 62 -99 SPO 1997 04 25 09 57 94 2.6 -9 672.80 -70.4 -63.4 -70.3 62 -99 SPO 1997 04 25 09 58 94 2.6 -9 672.80 -70.3 -63.4 -70.2 61 -99 SPO 1997 04 25 09 59 94 2.6 -9 672.80 -70.2 -63.4 -70.2 61 -99 SPO 1997 04 25 10 00 94 2.6 -9 672.80 -70.2 -63.4 -70.2 61 0 SPO 1997 04 25 10 01 94 2.5 -9 672.80 -70.1 -63.3 -70.2 61 -99 SPO 1997 04 25 10 02 95 2.5 -9 672.90 -70.1 -63.2 -70.2 61 -99 SPO 1997 04 25 10 03 95 2.5 -9 672.90 -70.0 -63.2 -70.1 61 -99 SPO 1997 04 25 10 04 98 2.5 -9 672.90 -70.0 -63.1 -70.1 62 -99 SPO 1997 04 25 10 05 99 2.5 -9 672.90 -69.9 -63.1 -70.0 62 -99 SPO 1997 04 25 10 06 100 2.5 -9 672.90 -69.8 -63.1 -69.9 62 -99 SPO 1997 04 25 10 07 101 2.5 -9 672.90 -69.7 -63.2 -69.9 62 -99 SPO 1997 04 25 10 08 99 2.5 -9 672.90 -69.7 -63.2 -69.8 61 -99 SPO 1997 04 25 10 09 97 2.5 -9 672.90 -69.7 -63.3 -69.8 60 -99 SPO 1997 04 25 10 10 95 2.4 -9 672.90 -69.7 -63.3 -69.8 60 -99 SPO 1997 04 25 10 11 92 2.4 -9 672.90 -69.8 -63.3 -69.9 61 -99 SPO 1997 04 25 10 12 92 2.3 -9 672.90 -69.9 -63.3 -69.9 61 -99 SPO 1997 04 25 10 13 92 2.3 -9 672.90 -70.0 -63.3 -70.0 61 -99 SPO 1997 04 25 10 14 92 2.4 -9 672.90 -70.0 -63.2 -70.0 61 -99 SPO 1997 04 25 10 15 92 2.4 -9 672.90 -70.0 -63.2 -70.0 61 -99 SPO 1997 04 25 10 16 90 2.5 -9 672.90 -70.0 -63.2 -70.0 62 -99 SPO 1997 04 25 10 17 90 2.5 -9 672.90 -70.0 -63.2 -70.0 62 -99 SPO 1997 04 25 10 18 90 2.5 -9 672.90 -70.0 -63.2 -70.0 63 -99 SPO 1997 04 25 10 19 89 2.6 -9 672.90 -69.9 -63.2 -69.9 62 -99 SPO 1997 04 25 10 20 89 2.7 -9 672.90 -69.9 -63.2 -69.9 62 -99 SPO 1997 04 25 10 21 89 2.7 -9 672.90 -69.9 -63.2 -70.0 62 -99 SPO 1997 04 25 10 22 89 2.7 -9 672.90 -69.9 -63.2 -70.0 62 -99 SPO 1997 04 25 10 23 89 2.7 -9 672.90 -69.9 -63.3 -70.0 62 -99 SPO 1997 04 25 10 24 89 2.6 -9 672.90 -69.9 -63.4 -70.0 62 -99 SPO 1997 04 25 10 25 89 2.5 -9 672.90 -69.9 -63.5 -70.0 62 -99 SPO 1997 04 25 10 26 87 2.6 -9 672.90 -69.9 -63.6 -70.0 62 -99 SPO 1997 04 25 10 27 86 2.6 -9 672.90 -69.9 -63.6 -70.0 62 -99 SPO 1997 04 25 10 28 88 2.6 -9 672.90 -69.9 -63.6 -70.0 63 -99 SPO 1997 04 25 10 29 88 2.5 -9 672.90 -69.9 -63.6 -70.0 63 -99 SPO 1997 04 25 10 30 88 2.5 -9 672.90 -70.0 -63.8 -70.0 64 -99 SPO 1997 04 25 10 31 88 2.5 -9 672.90 -70.0 -63.8 -70.1 64 -99 SPO 1997 04 25 10 32 89 2.5 -9 672.90 -70.1 -63.8 -70.1 64 -99 SPO 1997 04 25 10 33 88 2.4 -9 672.90 -70.1 -63.9 -70.2 64 -99 SPO 1997 04 25 10 34 88 2.4 -9 672.90 -70.2 -63.9 -70.2 64 -99 SPO 1997 04 25 10 35 89 2.3 -9 672.90 -70.3 -63.9 -70.2 65 -99 SPO 1997 04 25 10 36 89 2.3 -9 672.90 -70.3 -64.0 -70.2 64 -99 SPO 1997 04 25 10 37 88 2.4 -9 672.90 -70.4 -64.0 -70.3 65 -99 SPO 1997 04 25 10 38 87 2.4 -9 672.90 -70.4 -64.0 -70.3 65 -99 SPO 1997 04 25 10 39 86 2.4 -9 672.90 -70.4 -63.9 -70.3 65 -99 SPO 1997 04 25 10 40 86 2.4 -9 672.90 -70.5 -63.9 -70.3 66 -99 SPO 1997 04 25 10 41 85 2.4 -9 672.90 -70.5 -63.9 -70.3 65 -99 SPO 1997 04 25 10 42 86 2.5 -9 672.90 -70.4 -63.9 -70.3 63 -99 SPO 1997 04 25 10 43 86 2.5 -9 672.90 -70.4 -63.9 -70.3 63 -99 SPO 1997 04 25 10 44 87 2.5 -9 672.90 -70.4 -63.8 -70.3 62 -99 SPO 1997 04 25 10 45 90 2.5 -9 672.90 -70.4 -63.7 -70.2 62 -99 SPO 1997 04 25 10 46 92 2.4 -9 672.90 -70.3 -63.7 -70.2 61 -99 SPO 1997 04 25 10 47 92 2.3 -9 672.90 -70.2 -63.7 -70.2 61 -99 SPO 1997 04 25 10 48 90 2.3 -9 672.90 -70.1 -63.7 -70.1 61 -99 SPO 1997 04 25 10 49 89 2.3 -9 672.90 -70.0 -63.6 -70.1 61 -99 SPO 1997 04 25 10 50 87 2.4 -9 672.90 -70.1 -63.6 -70.1 62 -99 SPO 1997 04 25 10 51 87 2.4 -9 672.90 -70.1 -63.7 -70.2 62 -99 SPO 1997 04 25 10 52 87 2.4 -9 672.90 -70.2 -63.7 -70.2 64 -99 SPO 1997 04 25 10 53 88 2.4 -9 672.90 -70.2 -63.8 -70.2 64 -99 SPO 1997 04 25 10 54 89 2.4 -9 672.90 -70.3 -63.8 -70.3 64 -99 SPO 1997 04 25 10 55 90 2.4 -9 672.90 -70.2 -63.8 -70.3 62 -99 SPO 1997 04 25 10 56 90 2.5 -9 672.90 -70.2 -63.8 -70.3 62 -99 SPO 1997 04 25 10 57 88 2.5 -9 672.80 -70.2 -63.8 -70.3 62 -99 SPO 1997 04 25 10 58 87 2.6 -9 672.80 -70.2 -63.8 -70.3 62 -99 SPO 1997 04 25 10 59 88 2.6 -9 672.80 -70.1 -63.7 -70.2 61 -99 SPO 1997 04 25 11 00 88 2.6 -9 672.80 -70.2 -63.8 -70.3 63 0 SPO 1997 04 25 11 01 87 2.5 -9 672.80 -70.2 -63.8 -70.3 63 -99 SPO 1997 04 25 11 02 86 2.5 -9 672.80 -70.2 -63.8 -70.3 63 -99 SPO 1997 04 25 11 03 85 2.5 -9 672.80 -70.3 -63.8 -70.3 64 -99 SPO 1997 04 25 11 04 85 2.6 -9 672.80 -70.3 -63.8 -70.3 64 -99 SPO 1997 04 25 11 05 84 2.6 -9 672.80 -70.3 -63.8 -70.3 64 -99 SPO 1997 04 25 11 06 84 2.6 -9 672.80 -70.3 -63.8 -70.3 63 -99 SPO 1997 04 25 11 07 86 2.5 -9 672.80 -70.4 -63.9 -70.4 64 -99 SPO 1997 04 25 11 08 88 2.4 -9 672.80 -70.3 -63.9 -70.4 63 -99 SPO 1997 04 25 11 09 88 2.5 -9 672.80 -70.3 -63.9 -70.4 63 -99 SPO 1997 04 25 11 10 87 2.6 -9 672.80 -70.3 -63.9 -70.4 63 -99 SPO 1997 04 25 11 11 87 2.7 -9 672.70 -70.4 -63.9 -70.4 64 -99 SPO 1997 04 25 11 12 86 2.8 -9 672.70 -70.4 -63.9 -70.4 65 -99 SPO 1997 04 25 11 13 86 2.9 -9 672.70 -70.5 -63.8 -70.4 66 -99 SPO 1997 04 25 11 14 87 2.9 -9 672.70 -70.5 -63.6 -70.4 65 -99 SPO 1997 04 25 11 15 87 2.9 -9 672.60 -70.4 -63.6 -70.4 64 -99 SPO 1997 04 25 11 16 86 3.0 -9 672.60 -70.3 -63.6 -70.4 62 -99 SPO 1997 04 25 11 17 86 3.0 -9 672.60 -70.3 -63.6 -70.4 62 -99 SPO 1997 04 25 11 18 87 3.0 -9 672.60 -70.3 -63.6 -70.4 62 -99 SPO 1997 04 25 11 19 87 3.1 -9 672.60 -70.3 -63.6 -70.4 62 -99 SPO 1997 04 25 11 20 86 3.1 -9 672.60 -70.3 -63.6 -70.4 63 -99 SPO 1997 04 25 11 21 86 3.2 -9 672.60 -70.2 -63.6 -70.3 62 -99 SPO 1997 04 25 11 22 85 3.3 -9 672.60 -70.1 -63.6 -70.2 62 -99 SPO 1997 04 25 11 23 85 3.3 -9 672.60 -70.0 -63.6 -70.2 62 -99 SPO 1997 04 25 11 24 85 3.2 -9 672.60 -69.8 -63.5 -70.1 62 -99 SPO 1997 04 25 11 25 85 3.2 -9 672.60 -69.8 -63.5 -70.1 62 -99 SPO 1997 04 25 11 26 85 3.3 -9 672.60 -69.7 -63.4 -70.0 62 -99 SPO 1997 04 25 11 27 85 3.4 -9 672.60 -69.6 -63.4 -70.0 62 -99 SPO 1997 04 25 11 28 85 3.4 -9 672.60 -69.5 -63.3 -69.9 61 -99 SPO 1997 04 25 11 29 85 3.3 -9 672.60 -69.4 -63.2 -69.8 61 -99 SPO 1997 04 25 11 30 85 3.2 -9 672.60 -69.3 -63.2 -69.8 60 -99 SPO 1997 04 25 11 31 85 3.2 -9 672.60 -69.2 -63.3 -69.7 60 -99 SPO 1997 04 25 11 32 85 3.2 -9 672.60 -69.1 -63.3 -69.6 60 -99 SPO 1997 04 25 11 33 85 3.2 -9 672.60 -69.0 -63.3 -69.6 61 -99 SPO 1997 04 25 11 34 87 3.2 -9 672.60 -69.0 -63.3 -69.6 62 -99 SPO 1997 04 25 11 35 88 3.2 -9 672.60 -69.0 -63.4 -69.5 62 -99 SPO 1997 04 25 11 36 89 3.1 -9 672.60 -68.9 -63.4 -69.5 62 -99 SPO 1997 04 25 11 37 91 3.1 -9 672.60 -68.8 -63.4 -69.4 62 -99 SPO 1997 04 25 11 38 90 3.2 -9 672.60 -68.8 -63.4 -69.4 63 -99 SPO 1997 04 25 11 39 90 3.2 -9 672.60 -68.8 -63.4 -69.3 63 -99 SPO 1997 04 25 11 40 89 3.3 -9 672.60 -68.7 -63.5 -69.3 62 -99 SPO 1997 04 25 11 41 90 3.3 -9 672.60 -68.8 -63.5 -69.3 63 -99 SPO 1997 04 25 11 42 91 3.3 -9 672.60 -68.8 -63.5 -69.3 63 -99 SPO 1997 04 25 11 43 92 3.3 -9 672.60 -68.8 -63.5 -69.3 63 -99 SPO 1997 04 25 11 44 92 3.3 -9 672.60 -68.9 -63.5 -69.3 63 -99 SPO 1997 04 25 11 45 93 3.2 -9 672.60 -68.9 -63.6 -69.3 64 -99 SPO 1997 04 25 11 46 94 3.2 -9 672.60 -69.0 -63.6 -69.3 65 -99 SPO 1997 04 25 11 47 93 3.1 -9 672.60 -69.0 -63.6 -69.3 66 -99 SPO 1997 04 25 11 48 92 3.0 -9 672.60 -69.0 -63.7 -69.3 66 -99 SPO 1997 04 25 11 49 92 2.9 -9 672.60 -69.1 -63.7 -69.4 67 -99 SPO 1997 04 25 11 50 93 2.8 -9 672.60 -69.1 -63.8 -69.4 66 -99 SPO 1997 04 25 11 51 93 2.6 -9 672.60 -69.2 -63.8 -69.4 66 -99 SPO 1997 04 25 11 52 96 2.5 -9 672.70 -69.2 -63.9 -69.4 65 -99 SPO 1997 04 25 11 53 99 2.5 -9 672.70 -69.4 -64.0 -69.5 66 -99 SPO 1997 04 25 11 54 101 2.6 -9 672.60 -69.5 -64.0 -69.6 67 -99 SPO 1997 04 25 11 55 101 2.6 -9 672.60 -69.8 -64.0 -69.7 69 -99 SPO 1997 04 25 11 56 101 2.6 -9 672.60 -70.1 -64.1 -69.8 70 -99 SPO 1997 04 25 11 57 100 2.5 -9 672.50 -70.3 -64.1 -69.9 70 -99 SPO 1997 04 25 11 58 97 2.5 -9 672.50 -70.4 -64.2 -70.0 70 -99 SPO 1997 04 25 11 59 96 2.4 -9 672.50 -70.5 -64.2 -70.1 70 -99 SPO 1997 04 25 12 00 97 2.4 -9 672.50 -70.5 -64.3 -70.1 69 0 SPO 1997 04 25 12 01 96 2.6 -9 672.50 -70.6 -64.3 -70.1 69 -99 SPO 1997 04 25 12 02 94 2.8 -9 672.50 -70.6 -64.2 -70.2 68 -99 SPO 1997 04 25 12 03 93 2.9 -9 672.50 -70.6 -64.1 -70.2 68 -99 SPO 1997 04 25 12 04 94 2.9 -9 672.40 -70.6 -64.1 -70.2 67 -99 SPO 1997 04 25 12 05 94 2.9 -9 672.40 -70.5 -64.0 -70.2 65 -99 SPO 1997 04 25 12 06 94 2.9 -9 672.40 -70.5 -64.0 -70.2 65 -99 SPO 1997 04 25 12 07 94 3.0 -9 672.40 -70.5 -64.0 -70.3 65 -99 SPO 1997 04 25 12 08 93 3.1 -9 672.40 -70.5 -64.0 -70.3 65 -99 SPO 1997 04 25 12 09 92 3.2 -9 672.30 -70.5 -64.0 -70.3 65 -99 SPO 1997 04 25 12 10 93 3.2 -9 672.30 -70.4 -64.0 -70.3 64 -99 SPO 1997 04 25 12 11 92 3.2 -9 672.30 -70.3 -64.1 -70.2 63 -99 SPO 1997 04 25 12 12 91 3.1 -9 672.30 -70.2 -64.2 -70.2 62 -99 SPO 1997 04 25 12 13 92 3.0 -9 672.30 -70.1 -64.2 -70.2 62 -99 SPO 1997 04 25 12 14 90 2.9 -9 672.30 -70.1 -64.4 -70.2 62 -99 SPO 1997 04 25 12 15 88 2.9 -9 672.30 -70.0 -64.4 -70.2 61 -99 SPO 1997 04 25 12 16 87 2.9 -9 672.30 -70.0 -64.3 -70.1 62 -99 SPO 1997 04 25 12 17 87 2.8 -9 672.40 -70.0 -64.3 -70.1 62 -99 SPO 1997 04 25 12 18 88 2.7 -9 672.40 -69.9 -64.3 -70.1 62 -99 SPO 1997 04 25 12 19 88 2.7 -9 672.40 -69.8 -64.3 -70.1 62 -99 SPO 1997 04 25 12 20 86 2.7 -9 672.40 -69.8 -64.3 -70.0 62 -99 SPO 1997 04 25 12 21 86 2.8 -9 672.40 -69.7 -64.2 -70.0 62 -99 SPO 1997 04 25 12 22 88 2.8 -9 672.30 -69.6 -64.2 -69.9 62 -99 SPO 1997 04 25 12 23 87 3.0 -9 672.30 -69.6 -64.2 -69.9 62 -99 SPO 1997 04 25 12 24 85 3.1 -9 672.30 -69.6 -64.2 -69.9 62 -99 SPO 1997 04 25 12 25 84 3.2 -9 672.30 -69.5 -64.2 -69.8 61 -99 SPO 1997 04 25 12 26 84 3.3 -9 672.30 -69.4 -64.2 -69.8 60 -99 SPO 1997 04 25 12 27 83 3.4 -9 672.20 -69.4 -64.2 -69.7 61 -99 SPO 1997 04 25 12 28 81 3.5 -9 672.20 -69.2 -64.0 -69.6 59 -99 SPO 1997 04 25 12 29 81 3.5 -9 672.20 -69.1 -63.9 -69.5 59 -99 SPO 1997 04 25 12 30 81 3.5 -9 672.20 -69.1 -64.0 -69.4 60 -99 SPO 1997 04 25 12 31 81 3.5 -9 672.20 -68.9 -64.1 -69.3 60 -99 SPO 1997 04 25 12 32 81 3.5 -9 672.20 -68.8 -64.1 -69.3 60 -99 SPO 1997 04 25 12 33 83 3.4 -9 672.20 -68.7 -64.1 -69.2 60 -99 SPO 1997 04 25 12 34 84 3.3 -9 672.20 -68.7 -64.1 -69.2 62 -99 SPO 1997 04 25 12 35 84 3.3 -9 672.20 -68.7 -64.1 -69.2 62 -99 SPO 1997 04 25 12 36 83 3.3 -9 672.20 -68.6 -64.1 -69.1 61 -99 SPO 1997 04 25 12 37 83 3.3 -9 672.20 -68.7 -64.1 -69.1 63 -99 SPO 1997 04 25 12 38 83 3.2 -9 672.20 -68.7 -64.2 -69.1 62 -99 SPO 1997 04 25 12 39 84 3.2 -9 672.20 -68.7 -64.2 -69.1 62 -99 SPO 1997 04 25 12 40 83 3.2 -9 672.20 -68.8 -64.4 -69.1 63 -99 SPO 1997 04 25 12 41 83 3.2 -9 672.20 -68.8 -64.5 -69.2 63 -99 SPO 1997 04 25 12 42 82 3.4 -9 672.20 -68.8 -64.6 -69.2 63 -99 SPO 1997 04 25 12 43 82 3.4 -9 672.20 -68.9 -64.6 -69.2 64 -99 SPO 1997 04 25 12 44 82 3.5 -9 672.20 -68.9 -64.7 -69.2 65 -99 SPO 1997 04 25 12 45 83 3.5 -9 672.20 -68.9 -64.8 -69.2 65 -99 SPO 1997 04 25 12 46 83 3.5 -9 672.20 -68.9 -64.8 -69.2 65 -99 SPO 1997 04 25 12 47 83 3.5 -9 672.20 -68.9 -64.8 -69.2 65 -99 SPO 1997 04 25 12 48 83 3.4 -9 672.20 -68.8 -64.8 -69.1 63 -99 SPO 1997 04 25 12 49 84 3.4 -9 672.20 -68.8 -64.8 -69.1 64 -99 SPO 1997 04 25 12 50 86 3.2 -9 672.20 -68.7 -64.9 -69.0 63 -99 SPO 1997 04 25 12 51 86 3.1 -9 672.20 -68.7 -65.0 -69.0 63 -99 SPO 1997 04 25 12 52 84 3.0 -9 672.20 -68.7 -65.0 -69.0 63 -99 SPO 1997 04 25 12 53 82 3.0 -9 672.20 -68.6 -65.0 -69.0 63 -99 SPO 1997 04 25 12 54 80 3.0 -9 672.20 -68.6 -65.1 -69.0 64 -99 SPO 1997 04 25 12 55 79 3.1 -9 672.20 -68.7 -65.0 -68.9 65 -99 SPO 1997 04 25 12 56 79 3.2 -9 672.20 -68.8 -64.9 -69.0 67 -99 SPO 1997 04 25 12 57 79 3.2 -9 672.20 -68.8 -64.6 -69.0 67 -99 SPO 1997 04 25 12 58 80 3.1 -9 672.20 -68.7 -64.6 -69.0 66 -99 SPO 1997 04 25 12 59 79 3.1 -9 672.20 -68.6 -64.5 -68.9 64 -99 SPO 1997 04 25 13 00 78 3.0 -9 672.20 -68.7 -64.5 -68.9 65 0 SPO 1997 04 25 13 01 78 3.0 -9 672.20 -68.7 -64.5 -68.9 65 -99 SPO 1997 04 25 13 02 80 3.0 -9 672.20 -68.7 -64.5 -68.9 65 -99 SPO 1997 04 25 13 03 81 2.9 -9 672.20 -68.8 -64.4 -69.0 65 -99 SPO 1997 04 25 13 04 82 3.0 -9 672.20 -68.8 -64.5 -69.0 66 -99 SPO 1997 04 25 13 05 83 3.0 -9 672.20 -68.9 -64.6 -69.0 67 -99 SPO 1997 04 25 13 06 83 3.0 -9 672.20 -69.0 -64.6 -69.1 67 -99 SPO 1997 04 25 13 07 81 3.1 -9 672.20 -69.0 -64.6 -69.2 67 -99 SPO 1997 04 25 13 08 81 3.1 -9 672.20 -69.1 -64.5 -69.2 68 -99 SPO 1997 04 25 13 09 81 3.1 -9 672.20 -69.2 -64.4 -69.2 68 -99 SPO 1997 04 25 13 10 80 3.2 -9 672.20 -69.2 -64.4 -69.2 67 -99 SPO 1997 04 25 13 11 81 3.2 -9 672.20 -69.2 -64.4 -69.2 66 -99 SPO 1997 04 25 13 12 82 3.2 -9 672.20 -69.2 -64.4 -69.3 66 -99 SPO 1997 04 25 13 13 83 3.2 -9 672.20 -69.2 -64.3 -69.3 65 -99 SPO 1997 04 25 13 14 84 3.2 -9 672.20 -69.2 -64.2 -69.3 65 -99 SPO 1997 04 25 13 15 85 3.1 -9 672.20 -69.1 -64.3 -69.2 64 -99 SPO 1997 04 25 13 16 85 3.0 -9 672.20 -69.1 -64.4 -69.2 64 -99 SPO 1997 04 25 13 17 84 3.0 -9 672.20 -69.0 -64.4 -69.2 64 -99 SPO 1997 04 25 13 18 83 3.0 -9 672.20 -69.0 -64.4 -69.2 65 -99 SPO 1997 04 25 13 19 85 3.0 -9 672.20 -68.9 -64.5 -69.1 64 -99 SPO 1997 04 25 13 20 85 3.1 -9 672.20 -68.8 -64.6 -69.1 63 -99 SPO 1997 04 25 13 21 86 3.1 -9 672.20 -68.8 -64.7 -69.0 63 -99 SPO 1997 04 25 13 22 86 3.1 -9 672.20 -68.8 -64.7 -69.0 63 -99 SPO 1997 04 25 13 23 85 3.0 -9 672.20 -68.8 -64.6 -69.0 63 -99 SPO 1997 04 25 13 24 83 3.4 -9 672.10 -68.8 -64.5 -69.0 63 -99 SPO 1997 04 25 13 25 82 4.1 -9 672.10 -68.8 -64.4 -69.0 63 -99 SPO 1997 04 25 13 26 84 4.2 -9 672.10 -68.7 -64.3 -69.0 63 -99 SPO 1997 04 25 13 27 85 4.0 -9 672.10 -68.8 -64.4 -69.0 64 -99 SPO 1997 04 25 13 28 85 3.9 -9 672.20 -68.8 -64.5 -69.1 64 -99 SPO 1997 04 25 13 29 85 3.7 -9 672.20 -68.8 -64.6 -69.1 65 -99 SPO 1997 04 25 13 30 83 3.5 -9 672.10 -69.0 -64.8 -69.1 67 -99 SPO 1997 04 25 13 31 82 3.4 -9 672.10 -69.0 -64.8 -69.2 66 -99 SPO 1997 04 25 13 32 84 3.4 -9 672.10 -69.2 -64.8 -69.2 68 -99 SPO 1997 04 25 13 33 88 3.1 -9 672.20 -69.2 -65.0 -69.3 66 -99 SPO 1997 04 25 13 34 95 3.1 -9 672.20 -69.4 -65.1 -69.4 67 -99 SPO 1997 04 25 13 35 101 2.9 -9 672.30 -69.6 -65.3 -69.4 68 -99 SPO 1997 04 25 13 36 99 3.2 -9 672.20 -69.8 -65.4 -69.5 68 -99 SPO 1997 04 25 13 37 98 3.4 -9 672.20 -70.1 -65.5 -69.6 69 -99 SPO 1997 04 25 13 38 101 3.4 -9 672.20 -70.4 -65.5 -69.8 70 -99 SPO 1997 04 25 13 39 104 3.3 -9 672.30 -70.6 -65.5 -69.9 71 -99 SPO 1997 04 25 13 40 104 3.2 -9 672.30 -70.8 -65.5 -70.0 71 -99 SPO 1997 04 25 13 41 104 3.0 -9 672.30 -70.8 -65.5 -70.1 70 -99 SPO 1997 04 25 13 42 105 3.1 -9 672.40 -70.9 -65.5 -70.2 70 -99 SPO 1997 04 25 13 43 104 3.2 -9 672.30 -71.0 -65.5 -70.2 69 -99 SPO 1997 04 25 13 44 104 3.3 -9 672.30 -71.0 -65.5 -70.3 68 -99 SPO 1997 04 25 13 45 104 3.3 -9 672.20 -71.0 -65.5 -70.4 67 -99 SPO 1997 04 25 13 46 101 3.5 -9 672.20 -71.0 -65.4 -70.4 66 -99 SPO 1997 04 25 13 47 98 3.9 -9 672.20 -71.0 -65.4 -70.4 65 -99 SPO 1997 04 25 13 48 94 4.2 -9 672.20 -71.0 -65.3 -70.5 65 -99 SPO 1997 04 25 13 49 91 4.5 -9 672.20 -70.8 -65.2 -70.5 63 -99 SPO 1997 04 25 13 50 89 4.6 -9 672.20 -70.6 -64.9 -70.4 62 -99 SPO 1997 04 25 13 51 87 4.8 -9 672.20 -70.3 -64.7 -70.3 61 -99 SPO 1997 04 25 13 52 85 4.7 -9 672.10 -70.0 -64.5 -70.2 59 -99 SPO 1997 04 25 13 53 84 4.8 -9 672.10 -69.8 -64.4 -70.0 59 -99 SPO 1997 04 25 13 54 86 4.6 -9 672.10 -69.6 -64.3 -70.0 59 -99 SPO 1997 04 25 13 55 91 4.5 -9 672.20 -69.6 -64.4 -70.0 59 -99 SPO 1997 04 25 13 56 94 4.4 -9 672.20 -69.6 -64.5 -69.9 60 -99 SPO 1997 04 25 13 57 93 4.4 -9 672.10 -69.4 -64.6 -69.9 59 -99 SPO 1997 04 25 13 58 93 4.5 -9 672.10 -69.3 -64.6 -69.8 59 -99 SPO 1997 04 25 13 59 92 4.5 -9 672.10 -69.3 -64.7 -69.7 60 -99 SPO 1997 04 25 14 00 92 4.3 -9 672.10 -69.3 -64.7 -69.8 59 0 SPO 1997 04 25 14 01 91 4.4 -9 672.10 -69.4 -64.6 -69.8 61 -99 SPO 1997 04 25 14 02 91 4.5 -9 672.10 -69.5 -64.6 -69.8 62 -99 SPO 1997 04 25 14 03 90 4.5 -9 672.00 -69.5 -64.6 -69.8 62 -99 SPO 1997 04 25 14 04 90 4.5 -9 672.00 -69.6 -64.7 -69.8 63 -99 SPO 1997 04 25 14 05 91 4.5 -9 672.00 -69.6 -64.8 -69.8 64 -99 SPO 1997 04 25 14 06 92 4.4 -9 672.10 -69.6 -64.8 -69.8 63 -99 SPO 1997 04 25 14 07 93 4.3 -9 672.20 -69.6 -65.0 -69.8 63 -99 SPO 1997 04 25 14 08 94 4.2 -9 672.20 -69.6 -65.1 -69.8 63 -99 SPO 1997 04 25 14 09 92 4.3 -9 672.20 -69.6 -65.0 -69.8 63 -99 SPO 1997 04 25 14 10 90 4.4 -9 672.20 -69.6 -65.0 -69.8 63 -99 SPO 1997 04 25 14 11 87 4.5 -9 672.10 -69.6 -65.0 -69.8 62 -99 SPO 1997 04 25 14 12 87 4.5 -9 672.10 -69.5 -64.8 -69.8 62 -99 SPO 1997 04 25 14 13 86 4.5 -9 672.00 -69.5 -64.6 -69.7 62 -99 SPO 1997 04 25 14 14 85 4.5 -9 672.00 -69.4 -64.5 -69.7 62 -99 SPO 1997 04 25 14 15 85 4.4 -9 672.00 -69.4 -64.6 -69.7 62 -99 SPO 1997 04 25 14 16 85 4.4 -9 672.00 -69.4 -64.6 -69.7 63 -99 SPO 1997 04 25 14 17 81 4.6 -9 672.00 -69.3 -64.5 -69.6 63 -99 SPO 1997 04 25 14 18 80 4.7 -9 672.00 -69.2 -64.3 -69.6 62 -99 SPO 1997 04 25 14 19 80 4.7 -9 672.00 -69.2 -64.2 -69.5 62 -99 SPO 1997 04 25 14 20 80 4.6 -9 672.00 -69.1 -64.1 -69.5 62 -99 SPO 1997 04 25 14 21 78 4.7 -9 672.00 -69.1 -64.1 -69.4 62 -99 SPO 1997 04 25 14 22 77 5.0 -9 671.90 -69.1 -64.0 -69.4 62 -99 SPO 1997 04 25 14 23 76 5.4 -9 671.90 -69.0 -64.0 -69.3 62 -99 SPO 1997 04 25 14 24 78 5.3 -9 671.90 -68.9 -63.9 -69.2 62 -99 SPO 1997 04 25 14 25 80 5.3 -9 671.90 -68.8 -63.9 -69.2 63 -99 SPO 1997 04 25 14 26 80 5.0 -9 671.90 -68.8 -64.0 -69.1 63 -99 SPO 1997 04 25 14 27 81 4.7 -9 672.00 -68.8 -64.2 -69.2 63 -99 SPO 1997 04 25 14 28 83 4.5 -9 672.00 -68.8 -64.3 -69.2 63 -99 SPO 1997 04 25 14 29 84 4.1 -9 672.00 -68.9 -64.4 -69.2 63 -99 SPO 1997 04 25 14 30 84 4.1 -9 672.00 -68.9 -64.5 -69.2 63 -99 SPO 1997 04 25 14 31 84 4.2 -9 672.00 -68.9 -64.6 -69.2 63 -99 SPO 1997 04 25 14 32 82 4.2 -9 672.00 -68.9 -64.5 -69.3 63 -99 SPO 1997 04 25 14 33 82 4.2 -9 672.00 -69.0 -64.5 -69.3 63 -99 SPO 1997 04 25 14 34 83 4.3 -9 672.00 -69.1 -64.6 -69.3 64 -99 SPO 1997 04 25 14 35 82 4.4 -9 672.00 -69.2 -64.6 -69.3 65 -99 SPO 1997 04 25 14 36 80 4.6 -9 672.00 -69.2 -64.5 -69.4 66 -99 SPO 1997 04 25 14 37 78 4.8 -9 672.00 -69.2 -64.5 -69.4 66 -99 SPO 1997 04 25 14 38 78 4.8 -9 672.00 -69.2 -64.4 -69.4 66 -99 SPO 1997 04 25 14 39 78 4.8 -9 672.00 -69.3 -64.4 -69.4 67 -99 SPO 1997 04 25 14 40 77 4.7 -9 672.00 -69.3 -64.4 -69.4 67 -99 SPO 1997 04 25 14 41 77 4.7 -9 672.00 -69.3 -64.4 -69.4 65 -99 SPO 1997 04 25 14 42 77 4.6 -9 672.00 -69.3 -64.4 -69.4 64 -99 SPO 1997 04 25 14 43 76 4.7 -9 672.00 -69.2 -64.4 -69.3 63 -99 SPO 1997 04 25 14 44 74 4.7 -9 671.90 -69.2 -64.4 -69.3 63 -99 SPO 1997 04 25 14 45 72 4.6 -9 671.90 -69.2 -64.5 -69.3 63 -99 SPO 1997 04 25 14 46 72 4.5 -9 671.90 -69.1 -64.4 -69.3 62 -99 SPO 1997 04 25 14 47 74 4.4 -9 672.00 -69.1 -64.4 -69.3 63 -99 SPO 1997 04 25 14 48 76 4.1 -9 672.00 -69.2 -64.4 -69.3 64 -99 SPO 1997 04 25 14 49 76 3.8 -9 672.00 -69.2 -64.5 -69.3 65 -99 SPO 1997 04 25 14 50 75 3.8 -9 672.00 -69.2 -64.6 -69.4 65 -99 SPO 1997 04 25 14 51 72 3.8 -9 671.90 -69.2 -64.8 -69.4 64 -99 SPO 1997 04 25 14 52 69 3.9 -9 671.90 -69.2 -64.7 -69.3 64 -99 SPO 1997 04 25 14 53 69 3.7 -9 672.00 -69.1 -64.6 -69.3 63 -99 SPO 1997 04 25 14 54 71 3.5 -9 672.00 -69.1 -64.7 -69.3 63 -99 SPO 1997 04 25 14 55 73 3.2 -9 672.00 -69.1 -64.8 -69.3 63 -99 SPO 1997 04 25 14 56 76 3.1 -9 672.00 -69.1 -65.0 -69.3 63 -99 SPO 1997 04 25 14 57 78 3.1 -9 672.00 -69.1 -65.0 -69.3 63 -99 SPO 1997 04 25 14 58 77 3.0 -9 672.00 -69.1 -65.1 -69.3 63 -99 SPO 1997 04 25 14 59 74 2.9 -9 672.00 -69.1 -65.1 -69.3 64 -99 SPO 1997 04 25 15 00 74 3.0 -9 672.00 -69.2 -65.1 -69.4 65 0 SPO 1997 04 25 15 01 76 3.1 -9 672.00 -69.2 -65.0 -69.4 65 -99 SPO 1997 04 25 15 02 76 3.0 -9 672.00 -69.3 -65.0 -69.4 66 -99 SPO 1997 04 25 15 03 76 3.0 -9 672.00 -69.3 -65.0 -69.4 66 -99 SPO 1997 04 25 15 04 77 2.9 -9 672.10 -69.3 -65.0 -69.5 65 -99 SPO 1997 04 25 15 05 80 3.0 -9 672.10 -69.3 -65.0 -69.5 65 -99 SPO 1997 04 25 15 06 80 3.0 -9 672.00 -69.4 -65.1 -69.5 65 -99 SPO 1997 04 25 15 07 80 3.0 -9 672.00 -69.4 -65.2 -69.5 64 -99 SPO 1997 04 25 15 08 80 3.0 -9 672.00 -69.5 -65.2 -69.6 65 -99 SPO 1997 04 25 15 09 79 2.9 -9 672.00 -69.5 -65.2 -69.6 65 -99 SPO 1997 04 25 15 10 79 3.0 -9 672.00 -69.5 -65.1 -69.6 65 -99 SPO 1997 04 25 15 11 79 3.0 -9 672.00 -69.5 -65.0 -69.6 65 -99 SPO 1997 04 25 15 12 79 3.0 -9 671.90 -69.6 -65.0 -69.6 66 -99 SPO 1997 04 25 15 13 80 3.0 -9 671.90 -69.6 -64.9 -69.7 66 -99 SPO 1997 04 25 15 14 80 3.2 -9 671.90 -69.6 -65.0 -69.7 66 -99 SPO 1997 04 25 15 15 81 3.2 -9 671.90 -69.7 -65.0 -69.7 66 -99 SPO 1997 04 25 15 16 84 3.3 -9 671.90 -69.6 -65.0 -69.7 65 -99 SPO 1997 04 25 15 17 84 3.2 -9 671.90 -69.7 -65.0 -69.7 65 -99 SPO 1997 04 25 15 18 83 3.2 -9 672.00 -69.6 -65.0 -69.7 64 -99 SPO 1997 04 25 15 19 81 3.0 -9 671.90 -69.6 -65.0 -69.7 64 -99 SPO 1997 04 25 15 20 83 2.7 -9 672.00 -69.6 -65.0 -69.7 64 -99 SPO 1997 04 25 15 21 87 2.3 -9 672.00 -69.6 -65.2 -69.8 65 -99 SPO 1997 04 25 15 22 92 2.2 -9 672.00 -69.7 -65.4 -69.8 66 -99 SPO 1997 04 25 15 23 95 2.1 -9 672.00 -69.6 -65.5 -69.8 64 -99 SPO 1997 04 25 15 24 94 1.9 -9 672.00 -69.6 -65.7 -69.8 65 -99 SPO 1997 04 25 15 25 92 1.9 -9 672.00 -69.7 -65.9 -69.8 66 -99 SPO 1997 04 25 15 26 88 2.0 -9 672.00 -69.7 -65.9 -69.9 66 -99 SPO 1997 04 25 15 27 83 2.3 -9 671.90 -69.7 -65.9 -69.9 66 -99 SPO 1997 04 25 15 28 80 2.5 -9 671.90 -69.8 -65.8 -69.9 66 -99 SPO 1997 04 25 15 29 80 2.8 -9 671.80 -69.8 -65.6 -70.0 66 -99 SPO 1997 04 25 15 30 80 2.8 -9 671.90 -69.9 -65.4 -70.0 66 -99 SPO 1997 04 25 15 31 79 2.8 -9 671.90 -69.9 -65.4 -70.0 66 -99 SPO 1997 04 25 15 32 80 2.9 -9 671.80 -69.9 -65.3 -70.0 66 -99 SPO 1997 04 25 15 33 82 2.6 -9 671.80 -69.9 -65.4 -70.0 66 -99 SPO 1997 04 25 15 34 85 2.1 -9 671.90 -69.9 -65.4 -70.0 66 -99 SPO 1997 04 25 15 35 90 2.0 -9 671.90 -69.9 -65.6 -70.0 66 -99 SPO 1997 04 25 15 36 89 2.2 -9 671.90 -69.9 -65.6 -70.1 66 -99 SPO 1997 04 25 15 37 87 2.4 -9 671.90 -69.8 -65.6 -70.1 65 -99 SPO 1997 04 25 15 38 85 2.6 -9 671.90 -69.8 -65.6 -70.0 64 -99 SPO 1997 04 25 15 39 85 2.6 -9 671.90 -69.8 -65.7 -70.0 64 -99 SPO 1997 04 25 15 40 89 2.6 -9 671.90 -69.8 -65.8 -70.0 64 -99 SPO 1997 04 25 15 41 91 2.6 -9 671.90 -69.8 -65.9 -70.1 64 -99 SPO 1997 04 25 15 42 88 2.6 -9 671.90 -69.9 -66.0 -70.1 65 -99 SPO 1997 04 25 15 43 84 2.6 -9 671.90 -69.9 -65.9 -70.1 65 -99 SPO 1997 04 25 15 44 82 2.8 -9 671.90 -69.9 -65.9 -70.1 66 -99 SPO 1997 04 25 15 45 81 2.8 -9 671.90 -69.9 -65.8 -70.1 66 -99 SPO 1997 04 25 15 46 82 2.6 -9 671.90 -69.9 -65.8 -70.1 66 -99 SPO 1997 04 25 15 47 84 2.4 -9 671.90 -69.9 -65.9 -70.1 66 -99 SPO 1997 04 25 15 48 86 2.3 -9 671.90 -69.9 -66.0 -70.1 65 -99 SPO 1997 04 25 15 49 88 2.3 -9 671.90 -69.8 -66.0 -70.1 63 -99 SPO 1997 04 25 15 50 86 2.5 -9 671.90 -69.8 -66.0 -70.1 63 -99 SPO 1997 04 25 15 51 84 2.5 -9 671.90 -69.8 -66.0 -70.1 62 -99 SPO 1997 04 25 15 52 86 2.6 -9 672.00 -69.9 -66.0 -70.2 63 -99 SPO 1997 04 25 15 53 87 2.6 -9 672.00 -70.0 -66.0 -70.2 64 -99 SPO 1997 04 25 15 54 86 3.0 -9 672.00 -70.0 -66.0 -70.2 64 -99 SPO 1997 04 25 15 55 86 3.1 -9 672.00 -70.0 -66.0 -70.2 65 -99 SPO 1997 04 25 15 56 83 3.3 -9 672.00 -70.1 -65.9 -70.2 66 -99 SPO 1997 04 25 15 57 83 3.2 -9 671.90 -70.2 -65.9 -70.3 66 -99 SPO 1997 04 25 15 58 84 3.2 -9 671.90 -70.4 -65.9 -70.3 68 -99 SPO 1997 04 25 15 59 84 3.2 -9 671.90 -70.4 -65.9 -70.4 67 -99 SPO 1997 04 25 16 00 84 3.3 -9 671.90 -70.5 -66.0 -70.4 67 0 SPO 1997 04 25 16 01 83 3.4 -9 671.90 -70.6 -65.9 -70.5 66 -99 SPO 1997 04 25 16 02 82 3.5 -9 671.90 -70.7 -65.8 -70.5 66 -99 SPO 1997 04 25 16 03 81 3.4 -9 671.90 -70.7 -65.7 -70.6 65 -99 SPO 1997 04 25 16 04 80 3.4 -9 671.90 -70.6 -65.6 -70.6 64 -99 SPO 1997 04 25 16 05 80 3.3 -9 671.90 -70.5 -65.6 -70.5 62 -99 SPO 1997 04 25 16 06 81 3.3 -9 671.90 -70.5 -65.6 -70.5 63 -99 SPO 1997 04 25 16 07 82 3.1 -9 671.90 -70.5 -65.7 -70.5 63 -99 SPO 1997 04 25 16 08 83 3.2 -9 671.90 -70.5 -65.8 -70.5 64 -99 SPO 1997 04 25 16 09 82 3.2 -9 671.90 -70.5 -65.8 -70.6 64 -99 SPO 1997 04 25 16 10 80 3.1 -9 671.90 -70.4 -65.6 -70.5 63 -99 SPO 1997 04 25 16 11 80 3.0 -9 671.90 -70.4 -65.6 -70.5 63 -99 SPO 1997 04 25 16 12 82 3.1 -9 671.90 -70.2 -65.6 -70.5 61 -99 SPO 1997 04 25 16 13 84 3.1 -9 671.90 -70.2 -65.6 -70.4 61 -99 SPO 1997 04 25 16 14 83 3.1 -9 671.90 -70.1 -65.6 -70.4 61 -99 SPO 1997 04 25 16 15 82 3.0 -9 671.90 -70.1 -65.7 -70.4 61 -99 SPO 1997 04 25 16 16 82 3.0 -9 671.90 -70.1 -65.6 -70.4 61 -99 SPO 1997 04 25 16 17 82 3.0 -9 671.90 -70.1 -65.6 -70.4 61 -99 SPO 1997 04 25 16 18 82 3.1 -9 671.80 -70.1 -65.6 -70.4 61 -99 SPO 1997 04 25 16 19 81 3.3 -9 671.80 -70.1 -65.5 -70.4 62 -99 SPO 1997 04 25 16 20 79 3.5 -9 671.80 -70.1 -65.4 -70.4 63 -99 SPO 1997 04 25 16 21 79 3.6 -9 671.80 -70.1 -65.3 -70.3 63 -99 SPO 1997 04 25 16 22 79 3.7 -9 671.80 -70.0 -65.3 -70.3 63 -99 SPO 1997 04 25 16 23 80 3.8 -9 671.80 -70.0 -65.2 -70.3 63 -99 SPO 1997 04 25 16 24 80 3.9 -9 671.80 -69.9 -65.2 -70.3 62 -99 SPO 1997 04 25 16 25 81 4.1 -9 671.80 -69.8 -65.1 -70.2 62 -99 SPO 1997 04 25 16 26 80 4.2 -9 671.70 -69.7 -65.0 -70.1 61 -99 SPO 1997 04 25 16 27 79 4.4 -9 671.70 -69.6 -64.9 -70.0 61 -99 SPO 1997 04 25 16 28 79 4.4 -9 671.70 -69.4 -64.8 -69.9 59 -99 SPO 1997 04 25 16 29 79 4.5 -9 671.70 -69.3 -64.8 -69.8 60 -99 SPO 1997 04 25 16 30 79 4.3 -9 671.70 -69.3 -64.8 -69.8 61 -99 SPO 1997 04 25 16 31 80 4.3 -9 671.70 -69.2 -64.8 -69.7 61 -99 SPO 1997 04 25 16 32 80 4.2 -9 671.70 -69.1 -64.7 -69.7 60 -99 SPO 1997 04 25 16 33 78 4.2 -9 671.80 -69.1 -64.7 -69.6 62 -99 SPO 1997 04 25 16 34 78 4.3 -9 671.80 -69.1 -64.8 -69.6 62 -99 SPO 1997 04 25 16 35 77 4.3 -9 671.80 -69.0 -64.8 -69.5 61 -99 SPO 1997 04 25 16 36 77 4.2 -9 671.80 -69.0 -64.8 -69.4 62 -99 SPO 1997 04 25 16 37 78 4.2 -9 671.80 -69.0 -64.9 -69.4 62 -99 SPO 1997 04 25 16 38 78 4.2 -9 671.80 -69.0 -64.9 -69.4 62 -99 SPO 1997 04 25 16 39 78 4.1 -9 671.80 -69.0 -64.9 -69.4 62 -99 SPO 1997 04 25 16 40 78 4.0 -9 671.80 -69.1 -64.9 -69.4 62 -99 SPO 1997 04 25 16 41 77 4.0 -9 671.80 -69.1 -65.0 -69.5 63 -99 SPO 1997 04 25 16 42 78 4.0 -9 671.80 -69.1 -65.0 -69.5 63 -99 SPO 1997 04 25 16 43 78 4.1 -9 671.80 -69.1 -65.0 -69.5 64 -99 SPO 1997 04 25 16 44 78 4.1 -9 671.80 -69.2 -65.0 -69.5 65 -99 SPO 1997 04 25 16 45 78 4.2 -9 671.80 -69.2 -65.0 -69.5 65 -99 SPO 1997 04 25 16 46 78 4.2 -9 671.80 -69.2 -65.0 -69.4 64 -99 SPO 1997 04 25 16 47 78 4.2 -9 671.70 -69.2 -65.0 -69.4 63 -99 SPO 1997 04 25 16 48 77 4.2 -9 671.70 -69.2 -65.0 -69.4 63 -99 SPO 1997 04 25 16 49 77 4.3 -9 671.70 -69.2 -65.1 -69.4 64 -99 SPO 1997 04 25 16 50 77 4.4 -9 671.70 -69.2 -65.1 -69.4 64 -99 SPO 1997 04 25 16 51 76 4.5 -9 671.70 -69.2 -65.1 -69.4 64 -99 SPO 1997 04 25 16 52 76 4.6 -9 671.70 -69.2 -65.0 -69.4 64 -99 SPO 1997 04 25 16 53 75 4.7 -9 671.70 -69.2 -64.8 -69.4 64 -99 SPO 1997 04 25 16 54 75 4.7 -9 671.70 -69.2 -64.7 -69.4 65 -99 SPO 1997 04 25 16 55 76 4.7 -9 671.70 -69.2 -64.6 -69.4 65 -99 SPO 1997 04 25 16 56 77 4.6 -9 671.70 -69.1 -64.7 -69.4 64 -99 SPO 1997 04 25 16 57 79 4.5 -9 671.70 -69.1 -64.7 -69.4 64 -99 SPO 1997 04 25 16 58 80 4.5 -9 671.70 -69.1 -64.7 -69.4 63 -99 SPO 1997 04 25 16 59 80 4.5 -9 671.70 -69.1 -64.7 -69.4 63 -99 SPO 1997 04 25 17 00 80 4.5 -9 671.70 -69.1 -64.6 -69.4 62 0 SPO 1997 04 25 17 01 80 4.5 -9 671.70 -69.1 -64.7 -69.4 62 -99 SPO 1997 04 25 17 02 81 4.5 -9 671.70 -69.2 -64.8 -69.4 62 -99 SPO 1997 04 25 17 03 81 4.4 -9 671.70 -69.2 -64.8 -69.4 63 -99 SPO 1997 04 25 17 04 81 4.5 -9 671.70 -69.2 -64.9 -69.4 63 -99 SPO 1997 04 25 17 05 80 4.5 -9 671.80 -69.2 -64.9 -69.4 63 -99 SPO 1997 04 25 17 06 79 4.6 -9 671.70 -69.2 -64.9 -69.4 63 -99 SPO 1997 04 25 17 07 78 4.7 -9 671.70 -69.2 -64.9 -69.4 64 -99 SPO 1997 04 25 17 08 78 4.8 -9 671.70 -69.2 -64.8 -69.4 63 -99 SPO 1997 04 25 17 09 78 4.7 -9 671.70 -69.2 -64.8 -69.4 63 -99 SPO 1997 04 25 17 10 80 4.7 -9 671.70 -69.2 -64.7 -69.4 63 -99 SPO 1997 04 25 17 11 80 4.7 -9 671.70 -69.2 -64.6 -69.4 63 -99 SPO 1997 04 25 17 12 80 4.6 -9 671.70 -69.2 -64.6 -69.4 63 -99 SPO 1997 04 25 17 13 80 4.6 -9 671.70 -69.2 -64.6 -69.3 62 -99 SPO 1997 04 25 17 14 81 4.5 -9 671.70 -69.2 -64.7 -69.4 62 -99 SPO 1997 04 25 17 15 81 4.6 -9 671.70 -69.2 -64.8 -69.4 63 -99 SPO 1997 04 25 17 16 82 4.5 -9 671.70 -69.3 -64.8 -69.4 64 -99 SPO 1997 04 25 17 17 81 4.5 -9 671.70 -69.3 -64.8 -69.4 64 -99 SPO 1997 04 25 17 18 80 4.5 -9 671.70 -69.3 -64.8 -69.5 64 -99 SPO 1997 04 25 17 19 80 4.5 -9 671.70 -69.4 -64.7 -69.5 65 -99 SPO 1997 04 25 17 20 80 4.5 -9 671.70 -69.4 -64.7 -69.5 64 -99 SPO 1997 04 25 17 21 81 4.4 -9 671.70 -69.4 -64.7 -69.5 64 -99 SPO 1997 04 25 17 22 81 4.3 -9 671.70 -69.4 -64.8 -69.5 63 -99 SPO 1997 04 25 17 23 82 4.3 -9 671.70 -69.4 -64.8 -69.5 63 -99 SPO 1997 04 25 17 24 81 4.5 -9 671.70 -69.5 -64.8 -69.6 64 -99 SPO 1997 04 25 17 25 80 4.7 -9 671.70 -69.4 -64.8 -69.5 63 -99 SPO 1997 04 25 17 26 79 4.9 -9 671.70 -69.4 -64.8 -69.5 63 -99 SPO 1997 04 25 17 27 78 4.9 -9 671.60 -69.3 -64.8 -69.5 62 -99 SPO 1997 04 25 17 28 77 4.9 -9 671.60 -69.3 -64.7 -69.4 63 -99 SPO 1997 04 25 17 29 77 4.8 -9 671.60 -69.3 -64.8 -69.4 63 -99 SPO 1997 04 25 17 30 77 4.8 -9 671.60 -69.3 -64.8 -69.4 64 -99 SPO 1997 04 25 17 31 77 4.7 -9 671.60 -69.3 -64.8 -69.4 64 -99 SPO 1997 04 25 17 32 76 4.7 -9 671.60 -69.2 -64.9 -69.4 63 -99 SPO 1997 04 25 17 33 75 4.8 -9 671.60 -69.2 -64.9 -69.4 63 -99 SPO 1997 04 25 17 34 75 4.7 -9 671.60 -69.1 -64.9 -69.3 63 -99 SPO 1997 04 25 17 35 75 4.6 -9 671.60 -69.1 -65.0 -69.3 63 -99 SPO 1997 04 25 17 36 75 4.6 -9 671.60 -69.2 -65.0 -69.3 64 -99 SPO 1997 04 25 17 37 75 4.5 -9 671.60 -69.1 -65.0 -69.3 64 -99 SPO 1997 04 25 17 38 76 4.4 -9 671.60 -69.1 -65.0 -69.3 64 -99 SPO 1997 04 25 17 39 77 4.3 -9 671.60 -69.1 -65.0 -69.3 65 -99 SPO 1997 04 25 17 40 77 4.1 -9 671.70 -69.1 -65.1 -69.3 65 -99 SPO 1997 04 25 17 41 77 3.9 -9 671.70 -69.1 -65.2 -69.3 64 -99 SPO 1997 04 25 17 42 78 3.9 -9 671.70 -69.1 -65.3 -69.3 64 -99 SPO 1997 04 25 17 43 76 3.8 -9 671.70 -69.1 -65.3 -69.3 64 -99 SPO 1997 04 25 17 44 74 3.7 -9 671.70 -69.1 -65.4 -69.3 64 -99 SPO 1997 04 25 17 45 73 3.5 -9 671.70 -69.1 -65.4 -69.3 64 -99 SPO 1997 04 25 17 46 72 3.4 -9 671.70 -69.1 -65.4 -69.3 64 -99 SPO 1997 04 25 17 47 71 3.0 -9 671.70 -69.1 -65.3 -69.3 64 -99 SPO 1997 04 25 17 48 70 3.0 -9 671.70 -69.2 -65.3 -69.3 65 -99 SPO 1997 04 25 17 49 71 3.3 -9 671.70 -69.1 -65.3 -69.3 64 -99 SPO 1997 04 25 17 50 71 3.5 -9 671.70 -69.1 -65.2 -69.3 64 -99 SPO 1997 04 25 17 51 71 3.6 -9 671.60 -69.1 -65.2 -69.3 64 -99 SPO 1997 04 25 17 52 71 3.8 -9 671.60 -69.2 -65.2 -69.3 66 -99 SPO 1997 04 25 17 53 70 3.8 -9 671.60 -69.2 -65.2 -69.3 66 -99 SPO 1997 04 25 17 54 70 3.8 -9 671.60 -69.1 -65.2 -69.3 64 -99 SPO 1997 04 25 17 55 69 3.7 -9 671.60 -69.2 -65.2 -69.3 64 -99 SPO 1997 04 25 17 56 68 3.6 -9 671.60 -69.2 -65.3 -69.3 64 -99 SPO 1997 04 25 17 57 69 3.7 -9 671.60 -69.2 -65.4 -69.3 64 -99 SPO 1997 04 25 17 58 69 3.6 -9 671.60 -69.2 -65.4 -69.3 64 -99 SPO 1997 04 25 17 59 69 3.5 -9 671.60 -69.2 -65.4 -69.3 64 -99 SPO 1997 04 25 18 00 70 3.5 -9 671.60 -69.2 -65.5 -69.3 64 0 SPO 1997 04 25 18 01 71 3.5 -9 671.60 -69.2 -65.5 -69.4 64 -99 SPO 1997 04 25 18 02 71 3.5 -9 671.60 -69.2 -65.5 -69.4 65 -99 SPO 1997 04 25 18 03 70 3.5 -9 671.60 -69.2 -65.6 -69.4 65 -99 SPO 1997 04 25 18 04 70 3.6 -9 671.60 -69.3 -65.6 -69.4 66 -99 SPO 1997 04 25 18 05 70 3.7 -9 671.60 -69.3 -65.6 -69.4 65 -99 SPO 1997 04 25 18 06 69 3.6 -9 671.60 -69.3 -65.6 -69.4 65 -99 SPO 1997 04 25 18 07 68 3.8 -9 671.60 -69.3 -65.5 -69.4 64 -99 SPO 1997 04 25 18 08 67 3.9 -9 671.60 -69.3 -65.5 -69.4 64 -99 SPO 1997 04 25 18 09 67 4.0 -9 671.60 -69.3 -65.4 -69.4 63 -99 SPO 1997 04 25 18 10 66 4.0 -9 671.60 -69.2 -65.4 -69.4 63 -99 SPO 1997 04 25 18 11 67 4.0 -9 671.60 -69.2 -65.4 -69.4 63 -99 SPO 1997 04 25 18 12 66 4.1 -9 671.60 -69.2 -65.3 -69.3 64 -99 SPO 1997 04 25 18 13 66 4.3 -9 671.50 -69.2 -65.3 -69.3 64 -99 SPO 1997 04 25 18 14 66 4.3 -9 671.50 -69.2 -65.2 -69.3 65 -99 SPO 1997 04 25 18 15 66 4.2 -9 671.50 -69.1 -65.1 -69.3 65 -99 SPO 1997 04 25 18 16 67 4.2 -9 671.50 -69.1 -65.1 -69.3 64 -99 SPO 1997 04 25 18 17 66 4.2 -9 671.50 -69.1 -65.0 -69.2 64 -99 SPO 1997 04 25 18 18 67 4.2 -9 671.50 -69.0 -65.0 -69.2 63 -99 SPO 1997 04 25 18 19 66 4.0 -9 671.60 -69.1 -65.0 -69.2 64 -99 SPO 1997 04 25 18 20 66 4.0 -9 671.60 -69.1 -65.1 -69.2 64 -99 SPO 1997 04 25 18 21 67 4.0 -9 671.60 -69.1 -65.1 -69.3 63 -99 SPO 1997 04 25 18 22 67 3.9 -9 671.60 -69.1 -65.0 -69.2 63 -99 SPO 1997 04 25 18 23 67 4.0 -9 671.60 -69.0 -65.0 -69.2 62 -99 SPO 1997 04 25 18 24 66 4.0 -9 671.60 -69.0 -65.0 -69.2 63 -99 SPO 1997 04 25 18 25 66 4.0 -9 671.60 -69.0 -65.0 -69.2 64 -99 SPO 1997 04 25 18 26 67 4.1 -9 671.60 -69.0 -64.9 -69.2 64 -99 SPO 1997 04 25 18 27 66 4.1 -9 671.60 -69.1 -64.8 -69.2 65 -99 SPO 1997 04 25 18 28 65 4.2 -9 671.60 -69.1 -64.7 -69.2 64 -99 SPO 1997 04 25 18 29 65 4.3 -9 671.60 -69.1 -64.7 -69.3 63 -99 SPO 1997 04 25 18 30 65 4.2 -9 671.60 -69.1 -64.5 -69.3 63 -99 SPO 1997 04 25 18 31 66 4.2 -9 671.60 -69.1 -64.5 -69.2 63 -99 SPO 1997 04 25 18 32 67 4.2 -9 671.60 -69.1 -64.4 -69.2 63 -99 SPO 1997 04 25 18 33 68 4.1 -9 671.60 -69.1 -64.4 -69.3 63 -99 SPO 1997 04 25 18 34 69 4.1 -9 671.60 -69.1 -64.4 -69.3 64 -99 SPO 1997 04 25 18 35 69 4.1 -9 671.70 -69.1 -64.4 -69.3 64 -99 SPO 1997 04 25 18 36 69 4.1 -9 671.70 -69.2 -64.3 -69.3 64 -99 SPO 1997 04 25 18 37 68 4.2 -9 671.60 -69.2 -64.3 -69.3 64 -99 SPO 1997 04 25 18 38 68 4.3 -9 671.60 -69.2 -64.3 -69.3 65 -99 SPO 1997 04 25 18 39 67 4.4 -9 671.60 -69.2 -64.3 -69.3 64 -99 SPO 1997 04 25 18 40 68 4.6 -9 671.60 -69.2 -64.3 -69.4 64 -99 SPO 1997 04 25 18 41 68 4.6 -9 671.60 -69.2 -64.3 -69.4 64 -99 SPO 1997 04 25 18 42 69 4.6 -9 671.60 -69.2 -64.3 -69.3 63 -99 SPO 1997 04 25 18 43 70 4.7 -9 671.60 -69.2 -64.3 -69.4 62 -99 SPO 1997 04 25 18 44 71 4.6 -9 671.60 -69.3 -64.3 -69.4 63 -99 SPO 1997 04 25 18 45 72 4.5 -9 671.60 -69.3 -64.3 -69.4 63 -99 SPO 1997 04 25 18 46 72 4.5 -9 671.60 -69.3 -64.4 -69.4 64 -99 SPO 1997 04 25 18 47 73 4.4 -9 671.70 -69.3 -64.5 -69.4 64 -99 SPO 1997 04 25 18 48 72 4.5 -9 671.70 -69.3 -64.5 -69.4 64 -99 SPO 1997 04 25 18 49 73 4.5 -9 671.70 -69.3 -64.4 -69.4 64 -99 SPO 1997 04 25 18 50 74 4.2 -9 671.70 -69.3 -64.5 -69.4 64 -99 SPO 1997 04 25 18 51 76 3.9 -9 671.80 -69.3 -64.6 -69.4 64 -99 SPO 1997 04 25 18 52 78 3.7 -9 671.80 -69.3 -64.7 -69.4 64 -99 SPO 1997 04 25 18 53 80 3.6 -9 671.80 -69.4 -64.8 -69.5 64 -99 SPO 1997 04 25 18 54 81 3.5 -9 671.80 -69.5 -64.9 -69.5 65 -99 SPO 1997 04 25 18 55 81 3.5 -9 671.80 -69.6 -65.0 -69.6 66 -99 SPO 1997 04 25 18 56 80 3.5 -9 671.80 -69.7 -65.0 -69.7 66 -99 SPO 1997 04 25 18 57 80 3.5 -9 671.80 -69.8 -65.0 -69.7 67 -99 SPO 1997 04 25 18 58 80 3.6 -9 671.80 -69.9 -65.0 -69.8 67 -99 SPO 1997 04 25 18 59 80 3.5 -9 671.80 -70.0 -64.9 -69.9 68 -99 SPO 1997 04 25 19 00 79 3.5 -9 671.80 -70.2 -64.9 -69.9 69 0 SPO 1997 04 25 19 01 78 3.5 -9 671.80 -70.3 -64.9 -70.0 69 -99 SPO 1997 04 25 19 02 77 3.5 -9 671.80 -70.3 -64.9 -70.0 68 -99 SPO 1997 04 25 19 03 76 3.5 -9 671.80 -70.4 -64.9 -70.1 67 -99 SPO 1997 04 25 19 04 74 3.7 -9 671.80 -70.5 -65.0 -70.2 67 -99 SPO 1997 04 25 19 05 74 4.0 -9 671.80 -70.5 -65.0 -70.2 66 -99 SPO 1997 04 25 19 06 73 4.1 -9 671.70 -70.4 -64.8 -70.2 64 -99 SPO 1997 04 25 19 07 73 4.1 -9 671.70 -70.4 -65.0 -70.2 64 -99 SPO 1997 04 25 19 08 73 4.3 -9 671.70 -70.4 -65.0 -70.2 64 -99 SPO 1997 04 25 19 09 73 4.5 -9 671.70 -70.3 -64.9 -70.2 63 -99 SPO 1997 04 25 19 10 71 4.5 -9 671.70 -70.2 -65.0 -70.1 63 -99 SPO 1997 04 25 19 11 71 4.7 -9 671.70 -70.2 -65.0 -70.1 63 -99 SPO 1997 04 25 19 12 71 4.7 -9 671.70 -70.0 -64.8 -70.0 62 -99 SPO 1997 04 25 19 13 70 4.5 -9 671.70 -69.9 -64.8 -69.9 62 -99 SPO 1997 04 25 19 14 71 4.4 -9 671.70 -69.8 -64.8 -69.8 61 -99 SPO 1997 04 25 19 15 73 4.4 -9 671.70 -69.6 -64.8 -69.8 59 -99 SPO 1997 04 25 19 16 75 4.1 -9 671.70 -69.5 -64.8 -69.7 59 -99 SPO 1997 04 25 19 17 77 4.0 -9 671.80 -69.5 -65.0 -69.7 59 -99 SPO 1997 04 25 19 18 78 3.9 -9 671.80 -69.4 -65.2 -69.7 58 -99 SPO 1997 04 25 19 19 79 3.8 -9 671.80 -69.5 -65.3 -69.7 60 -99 SPO 1997 04 25 19 20 79 3.9 -9 671.80 -69.5 -65.3 -69.8 61 -99 SPO 1997 04 25 19 21 79 4.0 -9 671.80 -69.6 -65.3 -69.8 62 -99 SPO 1997 04 25 19 22 79 4.0 -9 671.80 -69.6 -65.4 -69.8 62 -99 SPO 1997 04 25 19 23 79 4.0 -9 671.70 -69.7 -65.4 -69.9 63 -99 SPO 1997 04 25 19 24 79 3.9 -9 671.70 -69.8 -65.3 -69.9 64 -99 SPO 1997 04 25 19 25 77 3.9 -9 671.70 -69.9 -65.2 -70.0 63 -99 SPO 1997 04 25 19 26 77 3.9 -9 671.70 -70.0 -65.3 -70.0 64 -99 SPO 1997 04 25 19 27 78 3.9 -9 671.80 -70.0 -65.3 -70.0 62 -99 SPO 1997 04 25 19 28 77 4.0 -9 671.80 -70.0 -65.2 -70.1 62 -99 SPO 1997 04 25 19 29 77 3.9 -9 671.80 -70.0 -65.2 -70.1 62 -99 SPO 1997 04 25 19 30 75 4.0 -9 671.80 -70.0 -65.2 -70.1 61 -99 SPO 1997 04 25 19 31 73 4.0 -9 671.70 -70.0 -65.2 -70.1 62 -99 SPO 1997 04 25 19 32 73 4.2 -9 671.70 -70.0 -65.1 -70.1 62 -99 SPO 1997 04 25 19 33 72 4.0 -9 671.70 -70.1 -65.0 -70.1 63 -99 SPO 1997 04 25 19 34 71 4.0 -9 671.70 -70.1 -65.2 -70.1 63 -99 SPO 1997 04 25 19 35 72 4.3 -9 671.70 -70.0 -65.2 -70.1 62 -99 SPO 1997 04 25 19 36 72 4.5 -9 671.60 -69.9 -64.9 -70.0 62 -99 SPO 1997 04 25 19 37 70 4.4 -9 671.60 -69.8 -65.1 -69.9 61 -99 SPO 1997 04 25 19 38 72 4.5 -9 671.70 -69.7 -65.0 -69.8 61 -99 SPO 1997 04 25 19 39 71 4.3 -9 671.70 -69.7 -65.0 -69.8 61 -99 SPO 1997 04 25 19 40 72 4.5 -9 671.70 -69.6 -65.2 -69.8 60 -99 SPO 1997 04 25 19 41 72 4.5 -9 671.70 -69.6 -65.0 -69.8 61 -99 SPO 1997 04 25 19 42 72 4.1 -9 671.70 -69.5 -65.0 -69.8 60 -99 SPO 1997 04 25 19 43 72 4.0 -9 671.70 -69.6 -65.3 -69.8 62 -99 SPO 1997 04 25 19 44 72 4.4 -9 671.70 -69.6 -65.2 -69.8 62 -99 SPO 1997 04 25 19 45 72 4.4 -9 671.70 -69.6 -65.1 -69.8 62 -99 SPO 1997 04 25 19 46 71 4.2 -9 671.70 -69.6 -65.2 -69.8 62 -99 SPO 1997 04 25 19 47 72 4.2 -9 671.70 -69.6 -65.3 -69.8 62 -99 SPO 1997 04 25 19 48 72 4.5 -9 671.70 -69.6 -65.3 -69.8 62 -99 SPO 1997 04 25 19 49 74 4.8 -9 671.70 -69.6 -64.8 -69.8 62 -99 SPO 1997 04 25 19 50 73 4.3 -9 671.70 -69.7 -65.1 -69.8 62 -99 SPO 1997 04 25 19 51 73 4.4 -9 671.70 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 19 52 74 4.4 -9 671.70 -69.7 -65.2 -69.9 62 -99 SPO 1997 04 25 19 53 74 4.7 -9 671.70 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 19 54 72 4.3 -9 671.70 -69.6 -64.9 -69.8 62 -99 SPO 1997 04 25 19 55 71 4.3 -9 671.70 -69.6 -65.1 -69.8 62 -99 SPO 1997 04 25 19 56 71 4.6 -9 671.70 -69.7 -65.2 -69.8 64 -99 SPO 1997 04 25 19 57 70 4.6 -9 671.70 -69.7 -65.2 -69.8 64 -99 SPO 1997 04 25 19 58 69 4.5 -9 671.70 -69.7 -65.2 -69.8 64 -99 SPO 1997 04 25 19 59 69 4.6 -9 671.70 -69.7 -65.1 -69.8 63 -99 SPO 1997 04 25 20 00 68 4.3 -9 671.70 -69.7 -65.2 -69.8 63 0 SPO 1997 04 25 20 01 70 4.6 -9 671.70 -69.7 -65.2 -69.8 63 -99 SPO 1997 04 25 20 02 69 4.5 -9 671.70 -69.6 -65.2 -69.8 62 -99 SPO 1997 04 25 20 03 70 4.8 -9 671.70 -69.6 -65.2 -69.7 62 -99 SPO 1997 04 25 20 04 70 4.7 -9 671.70 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 05 70 4.7 -9 671.70 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 06 72 4.8 -9 671.70 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 07 71 4.6 -9 671.70 -69.6 -65.3 -69.7 64 -99 SPO 1997 04 25 20 08 71 4.8 -9 671.70 -69.6 -65.2 -69.7 64 -99 SPO 1997 04 25 20 09 71 4.6 -9 671.70 -69.6 -65.2 -69.7 65 -99 SPO 1997 04 25 20 10 71 4.7 -9 671.70 -69.6 -65.2 -69.7 65 -99 SPO 1997 04 25 20 11 71 4.5 -9 671.70 -69.6 -65.2 -69.7 64 -99 SPO 1997 04 25 20 12 69 4.6 -9 671.70 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 13 68 4.7 -9 671.60 -69.6 -65.3 -69.8 63 -99 SPO 1997 04 25 20 14 69 4.7 -9 671.60 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 15 69 4.4 -9 671.60 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 16 70 4.3 -9 671.60 -69.6 -65.3 -69.7 63 -99 SPO 1997 04 25 20 17 71 4.4 -9 671.60 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 18 71 4.5 -9 671.60 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 19 70 4.2 -9 671.60 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 20 71 4.3 -9 671.70 -69.6 -65.2 -69.7 63 -99 SPO 1997 04 25 20 21 71 4.3 -9 671.70 -69.6 -65.2 -69.8 63 -99 SPO 1997 04 25 20 22 67 3.9 -9 671.70 -69.6 -65.4 -69.8 63 -99 SPO 1997 04 25 20 23 68 4.5 -9 671.70 -69.7 -65.2 -69.8 63 -99 SPO 1997 04 25 20 24 67 4.3 -9 671.60 -69.7 -65.3 -69.8 63 -99 SPO 1997 04 25 20 25 68 4.4 -9 671.60 -69.7 -65.3 -69.8 62 -99 SPO 1997 04 25 20 26 68 4.6 -9 671.60 -69.7 -65.4 -69.8 62 -99 SPO 1997 04 25 20 27 67 4.8 -9 671.50 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 20 28 67 4.5 -9 671.60 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 20 29 66 4.5 -9 671.60 -69.7 -65.4 -69.8 62 -99 SPO 1997 04 25 20 30 67 4.5 -9 671.60 -69.7 -65.4 -69.8 63 -99 SPO 1997 04 25 20 31 67 4.5 -9 671.60 -69.8 -65.4 -69.8 64 -99 SPO 1997 04 25 20 32 67 4.6 -9 671.60 -69.7 -65.4 -69.8 63 -99 SPO 1997 04 25 20 33 66 4.3 -9 671.60 -69.7 -65.4 -69.8 63 -99 SPO 1997 04 25 20 34 65 4.3 -9 671.60 -69.7 -65.5 -69.8 63 -99 SPO 1997 04 25 20 35 65 4.1 -9 671.60 -69.7 -65.5 -69.8 63 -99 SPO 1997 04 25 20 36 66 3.9 -9 671.70 -69.7 -65.6 -69.8 62 -99 SPO 1997 04 25 20 37 64 3.6 -9 671.70 -69.7 -65.5 -69.8 62 -99 SPO 1997 04 25 20 38 67 4.0 -9 671.70 -69.7 -65.5 -69.8 62 -99 SPO 1997 04 25 20 39 67 4.0 -9 671.70 -69.7 -65.6 -69.8 62 -99 SPO 1997 04 25 20 40 66 4.1 -9 671.70 -69.7 -65.6 -69.8 62 -99 SPO 1997 04 25 20 41 64 4.2 -9 671.70 -69.7 -65.4 -69.8 62 -99 SPO 1997 04 25 20 42 62 4.2 -9 671.70 -69.8 -65.3 -69.9 64 -99 SPO 1997 04 25 20 43 63 4.3 -9 671.60 -69.7 -65.4 -69.8 63 -99 SPO 1997 04 25 20 44 64 4.2 -9 671.70 -69.8 -65.6 -69.9 64 -99 SPO 1997 04 25 20 45 65 4.3 -9 671.70 -69.8 -65.4 -69.9 64 -99 SPO 1997 04 25 20 46 64 4.2 -9 671.70 -69.7 -65.4 -69.9 62 -99 SPO 1997 04 25 20 47 64 4.4 -9 671.70 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 20 48 64 4.1 -9 671.70 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 20 49 64 4.3 -9 671.70 -69.7 -65.2 -69.8 62 -99 SPO 1997 04 25 20 50 65 4.4 -9 671.70 -69.7 -64.9 -69.8 62 -99 SPO 1997 04 25 20 51 64 4.1 -9 671.70 -69.7 -64.8 -69.8 62 -99 SPO 1997 04 25 20 52 65 4.2 -9 671.70 -69.7 -65.0 -69.8 62 -99 SPO 1997 04 25 20 53 65 4.2 -9 671.70 -69.7 -64.9 -69.8 62 -99 SPO 1997 04 25 20 54 65 4.2 -9 671.70 -69.7 -64.9 -69.8 62 -99 SPO 1997 04 25 20 55 66 4.4 -9 671.70 -69.7 -64.6 -69.8 62 -99 SPO 1997 04 25 20 56 65 4.2 -9 671.70 -69.7 -64.7 -69.8 62 -99 SPO 1997 04 25 20 57 66 4.7 -9 671.70 -69.7 -64.6 -69.8 62 -99 SPO 1997 04 25 20 58 63 4.4 -9 671.60 -69.7 -64.8 -69.9 62 -99 SPO 1997 04 25 20 59 64 4.7 -9 671.60 -69.8 -64.6 -69.9 62 -99 SPO 1997 04 25 21 00 64 4.9 -9 671.60 -69.8 -64.6 -69.9 62 0 SPO 1997 04 25 21 01 63 5.2 -9 671.60 -69.8 -64.4 -69.9 62 -99 SPO 1997 04 25 21 02 62 5.1 -9 671.60 -69.8 -64.4 -69.9 62 -99 SPO 1997 04 25 21 03 61 5.2 -9 671.60 -69.8 -64.4 -69.9 62 -99 SPO 1997 04 25 21 04 61 5.2 -9 671.60 -69.7 -64.4 -69.8 62 -99 SPO 1997 04 25 21 05 60 5.3 -9 671.60 -69.7 -64.3 -69.8 63 -99 SPO 1997 04 25 21 06 61 5.3 -9 671.60 -69.6 -64.2 -69.8 62 -99 SPO 1997 04 25 21 07 60 4.9 -9 671.60 -69.6 -64.2 -69.8 62 -99 SPO 1997 04 25 21 08 62 4.9 -9 671.60 -69.6 -64.4 -69.8 62 -99 SPO 1997 04 25 21 09 62 4.9 -9 671.70 -69.6 -64.5 -69.8 62 -99 SPO 1997 04 25 21 10 62 4.6 -9 671.70 -69.7 -64.6 -69.8 63 -99 SPO 1997 04 25 21 11 62 4.6 -9 671.70 -69.7 -64.7 -69.8 63 -99 SPO 1997 04 25 21 12 63 4.7 -9 671.70 -69.7 -64.7 -69.8 63 -99 SPO 1997 04 25 21 13 63 4.7 -9 671.70 -69.7 -64.7 -69.9 62 -99 SPO 1997 04 25 21 14 63 4.8 -9 671.60 -69.8 -64.7 -69.9 64 -99 SPO 1997 04 25 21 15 63 4.6 -9 671.60 -69.8 -64.8 -69.9 64 -99 SPO 1997 04 25 21 16 64 4.6 -9 671.60 -69.8 -64.8 -69.9 64 -99 SPO 1997 04 25 21 17 64 4.5 -9 671.70 -69.8 -65.0 -69.9 64 -99 SPO 1997 04 25 21 18 63 4.2 -9 671.70 -69.9 -65.0 -70.0 65 -99 SPO 1997 04 25 21 19 64 4.1 -9 671.70 -69.9 -64.9 -70.0 65 -99 SPO 1997 04 25 21 20 65 3.9 -9 671.70 -69.9 -65.0 -70.0 64 -99 SPO 1997 04 25 21 21 66 4.0 -9 671.70 -69.9 -65.0 -70.0 63 -99 SPO 1997 04 25 21 22 67 4.0 -9 671.80 -69.9 -65.1 -70.0 63 -99 SPO 1997 04 25 21 23 67 3.9 -9 671.80 -70.0 -65.2 -70.0 63 -99 SPO 1997 04 25 21 24 67 4.0 -9 671.80 -70.0 -65.2 -70.1 63 -99 SPO 1997 04 25 21 25 67 4.1 -9 671.80 -70.0 -65.4 -70.1 63 -99 SPO 1997 04 25 21 26 69 4.0 -9 671.80 -70.0 -65.4 -70.1 63 -99 SPO 1997 04 25 21 27 69 4.0 -9 671.80 -70.0 -65.4 -70.1 64 -99 SPO 1997 04 25 21 28 69 4.2 -9 671.80 -70.0 -65.2 -70.1 64 -99 SPO 1997 04 25 21 29 68 4.1 -9 671.80 -70.1 -65.1 -70.2 65 -99 SPO 1997 04 25 21 30 68 4.1 -9 671.70 -70.1 -65.3 -70.2 65 -99 SPO 1997 04 25 21 31 66 4.3 -9 671.70 -70.1 -65.2 -70.2 64 -99 SPO 1997 04 25 21 32 66 4.3 -9 671.70 -70.0 -65.0 -70.2 62 -99 SPO 1997 04 25 21 33 65 4.1 -9 671.70 -69.8 -65.1 -70.0 61 -99 SPO 1997 04 25 21 34 66 4.0 -9 671.70 -69.7 -65.2 -69.9 59 -99 SPO 1997 04 25 21 35 65 4.2 -9 671.70 -69.8 -65.3 -69.9 61 -99 SPO 1997 04 25 21 36 64 4.3 -9 671.70 -69.8 -65.4 -70.0 61 -99 SPO 1997 04 25 21 37 66 4.1 -9 671.70 -69.8 -65.4 -69.9 62 -99 SPO 1997 04 25 21 38 66 4.3 -9 671.80 -69.9 -65.3 -70.0 63 -99 SPO 1997 04 25 21 39 65 4.5 -9 671.80 -69.9 -65.2 -70.1 63 -99 SPO 1997 04 25 21 40 65 4.0 -9 671.80 -70.0 -65.3 -70.1 64 -99 SPO 1997 04 25 21 41 66 3.9 -9 671.80 -70.0 -65.3 -70.1 64 -99 SPO 1997 04 25 21 42 67 4.1 -9 671.80 -70.0 -65.2 -70.1 63 -99 SPO 1997 04 25 21 43 64 3.7 -9 671.80 -70.0 -65.4 -70.1 62 -99 SPO 1997 04 25 21 44 64 4.5 -9 671.80 -70.0 -65.2 -70.1 61 -99 SPO 1997 04 25 21 45 63 3.5 -9 671.80 -69.9 -65.6 -70.1 61 -99 SPO 1997 04 25 21 46 60 4.3 -9 671.80 -70.0 -65.4 -70.1 61 -99 SPO 1997 04 25 21 47 60 3.9 -9 671.80 -69.9 -65.6 -70.0 60 -99 SPO 1997 04 25 21 48 62 3.7 -9 671.80 -69.8 -65.7 -70.0 60 -99 SPO 1997 04 25 21 49 62 3.6 -9 671.80 -69.8 -65.7 -70.0 61 -99 SPO 1997 04 25 21 50 64 3.6 -9 671.80 -69.7 -65.7 -69.9 61 -99 SPO 1997 04 25 21 51 65 3.7 -9 671.80 -69.7 -65.7 -69.9 62 -99 SPO 1997 04 25 21 52 66 3.9 -9 671.80 -69.8 -65.7 -70.0 62 -99 SPO 1997 04 25 21 53 67 4.0 -9 671.80 -69.9 -65.7 -70.0 63 -99 SPO 1997 04 25 21 54 67 4.0 -9 671.80 -69.9 -65.7 -70.1 63 -99 SPO 1997 04 25 21 55 67 4.1 -9 671.80 -70.0 -65.6 -70.1 63 -99 SPO 1997 04 25 21 56 67 4.1 -9 671.80 -70.0 -65.6 -70.1 62 -99 SPO 1997 04 25 21 57 68 4.0 -9 671.80 -70.0 -65.6 -70.1 62 -99 SPO 1997 04 25 21 58 67 4.1 -9 671.80 -70.0 -65.6 -70.2 61 -99 SPO 1997 04 25 21 59 66 4.2 -9 671.80 -70.0 -65.6 -70.2 61 -99 SPO 1997 04 25 22 00 66 4.1 -9 671.80 -70.1 -65.5 -70.2 62 0 SPO 1997 04 25 22 01 66 4.2 -9 671.80 -70.1 -65.5 -70.2 62 -99 SPO 1997 04 25 22 02 66 4.1 -9 671.80 -70.1 -65.4 -70.2 62 -99 SPO 1997 04 25 22 03 65 4.2 -9 671.80 -70.1 -65.3 -70.2 63 -99 SPO 1997 04 25 22 04 65 4.1 -9 671.80 -70.1 -65.4 -70.2 63 -99 SPO 1997 04 25 22 05 65 4.2 -9 671.80 -70.2 -65.5 -70.2 64 -99 SPO 1997 04 25 22 06 66 4.1 -9 671.80 -70.2 -65.4 -70.2 64 -99 SPO 1997 04 25 22 07 65 4.1 -9 671.80 -70.2 -65.4 -70.3 63 -99 SPO 1997 04 25 22 08 66 4.1 -9 671.80 -70.2 -65.3 -70.3 62 -99 SPO 1997 04 25 22 09 65 4.1 -9 671.80 -70.2 -65.4 -70.3 62 -99 SPO 1997 04 25 22 10 64 4.2 -9 671.70 -70.3 -65.4 -70.3 63 -99 SPO 1997 04 25 22 11 63 4.2 -9 671.70 -70.2 -65.3 -70.3 62 -99 SPO 1997 04 25 22 12 61 4.4 -9 671.70 -70.2 -65.2 -70.3 63 -99 SPO 1997 04 25 22 13 61 4.4 -9 671.70 -70.2 -65.1 -70.3 63 -99 SPO 1997 04 25 22 14 60 4.4 -9 671.70 -70.2 -65.0 -70.3 63 -99 SPO 1997 04 25 22 15 59 4.4 -9 671.70 -70.1 -65.0 -70.2 61 -99 SPO 1997 04 25 22 16 59 4.3 -9 671.70 -70.2 -64.9 -70.3 62 -99 SPO 1997 04 25 22 17 60 4.3 -9 671.70 -70.2 -64.9 -70.3 62 -99 SPO 1997 04 25 22 18 59 4.4 -9 671.70 -70.3 -64.8 -70.3 63 -99 SPO 1997 04 25 22 19 59 4.4 -9 671.70 -70.3 -64.8 -70.4 63 -99 SPO 1997 04 25 22 20 59 4.5 -9 671.70 -70.3 -64.6 -70.4 62 -99 SPO 1997 04 25 22 21 58 4.5 -9 671.70 -70.4 -64.7 -70.4 63 -99 SPO 1997 04 25 22 22 58 4.4 -9 671.70 -70.4 -64.6 -70.4 63 -99 SPO 1997 04 25 22 23 57 4.5 -9 671.70 -70.5 -64.4 -70.5 64 -99 SPO 1997 04 25 22 24 57 4.6 -9 671.70 -70.5 -64.3 -70.5 64 -99 SPO 1997 04 25 22 25 57 4.6 -9 671.70 -70.6 -64.3 -70.6 65 -99 SPO 1997 04 25 22 26 56 4.7 -9 671.70 -70.6 -64.3 -70.6 64 -99 SPO 1997 04 25 22 27 57 4.6 -9 671.60 -70.6 -64.2 -70.6 64 -99 SPO 1997 04 25 22 28 57 4.6 -9 671.60 -70.5 -64.3 -70.6 62 -99 SPO 1997 04 25 22 29 56 4.2 -9 671.60 -70.4 -64.4 -70.5 61 -99 SPO 1997 04 25 22 30 57 4.4 -9 671.60 -70.4 -64.3 -70.4 61 -99 SPO 1997 04 25 22 31 58 4.3 -9 671.60 -70.3 -64.3 -70.4 61 -99 SPO 1997 04 25 22 32 58 4.3 -9 671.60 -70.3 -64.4 -70.4 61 -99 SPO 1997 04 25 22 33 59 4.3 -9 671.60 -70.2 -64.4 -70.3 61 -99 SPO 1997 04 25 22 34 61 4.3 -9 671.60 -70.2 -64.4 -70.3 61 -99 SPO 1997 04 25 22 35 63 4.1 -9 671.70 -70.2 -64.6 -70.3 61 -99 SPO 1997 04 25 22 36 63 4.2 -9 671.70 -70.2 -64.6 -70.4 61 -99 SPO 1997 04 25 22 37 64 4.3 -9 671.70 -70.2 -64.6 -70.4 61 -99 SPO 1997 04 25 22 38 65 4.3 -9 671.70 -70.2 -64.6 -70.4 61 -99 SPO 1997 04 25 22 39 64 4.2 -9 671.70 -70.2 -64.6 -70.4 61 -99 SPO 1997 04 25 22 40 64 4.3 -9 671.70 -70.2 -64.5 -70.4 61 -99 SPO 1997 04 25 22 41 63 4.3 -9 671.70 -70.2 -64.4 -70.4 61 -99 SPO 1997 04 25 22 42 62 4.2 -9 671.70 -70.2 -64.3 -70.3 61 -99 SPO 1997 04 25 22 43 61 4.4 -9 671.70 -70.2 -64.3 -70.3 61 -99 SPO 1997 04 25 22 44 59 4.3 -9 671.70 -70.2 -64.4 -70.3 61 -99 SPO 1997 04 25 22 45 57 4.4 -9 671.70 -70.2 -64.5 -70.3 61 -99 SPO 1997 04 25 22 46 57 4.4 -9 671.70 -70.2 -64.5 -70.3 61 -99 SPO 1997 04 25 22 47 58 4.7 -9 671.60 -70.2 -64.3 -70.3 62 -99 SPO 1997 04 25 22 48 55 4.2 -9 671.60 -70.2 -64.3 -70.3 63 -99 SPO 1997 04 25 22 49 58 4.8 -9 671.60 -70.1 -64.3 -70.3 62 -99 SPO 1997 04 25 22 50 57 4.3 -9 671.60 -70.1 -64.4 -70.3 62 -99 SPO 1997 04 25 22 51 58 4.3 -9 671.60 -70.1 -64.4 -70.3 61 -99 SPO 1997 04 25 22 52 58 4.0 -9 671.70 -70.2 -64.6 -70.3 62 -99 SPO 1997 04 25 22 53 58 4.1 -9 671.70 -70.2 -64.6 -70.3 62 -99 SPO 1997 04 25 22 54 58 3.9 -9 671.70 -70.2 -64.7 -70.3 61 -99 SPO 1997 04 25 22 55 58 4.2 -9 671.70 -70.2 -64.8 -70.3 61 -99 SPO 1997 04 25 22 56 59 4.0 -9 671.70 -70.2 -65.0 -70.3 61 -99 SPO 1997 04 25 22 57 58 4.0 -9 671.70 -70.2 -64.9 -70.3 61 -99 SPO 1997 04 25 22 58 57 4.1 -9 671.70 -70.3 -65.0 -70.3 62 -99 SPO 1997 04 25 22 59 55 4.4 -9 671.60 -70.3 -65.0 -70.4 62 -99 SPO 1997 04 25 23 00 55 4.5 -9 671.60 -70.3 -65.0 -70.3 62 0 SPO 1997 04 25 23 01 53 4.7 -9 671.60 -70.3 -64.8 -70.3 62 -99 SPO 1997 04 25 23 02 53 4.5 -9 671.60 -70.2 -64.8 -70.3 62 -99 SPO 1997 04 25 23 03 54 4.4 -9 671.60 -70.2 -64.7 -70.3 62 -99 SPO 1997 04 25 23 04 54 4.4 -9 671.60 -70.1 -64.7 -70.3 61 -99 SPO 1997 04 25 23 05 54 4.3 -9 671.60 -70.0 -64.8 -70.2 61 -99 SPO 1997 04 25 23 06 53 4.4 -9 671.60 -70.0 -64.9 -70.1 61 -99 SPO 1997 04 25 23 07 54 4.2 -9 671.60 -69.9 -64.9 -70.1 61 -99 SPO 1997 04 25 23 08 54 4.5 -9 671.60 -69.8 -64.9 -70.0 60 -99 SPO 1997 04 25 23 09 54 4.5 -9 671.60 -69.7 -64.8 -69.9 60 -99 SPO 1997 04 25 23 10 53 4.6 -9 671.60 -69.7 -64.8 -69.9 60 -99 SPO 1997 04 25 23 11 53 4.5 -9 671.60 -69.6 -64.9 -69.8 60 -99 SPO 1997 04 25 23 12 53 4.8 -9 671.60 -69.5 -64.9 -69.7 60 -99 SPO 1997 04 25 23 13 53 4.7 -9 671.60 -69.5 -64.8 -69.7 62 -99 SPO 1997 04 25 23 14 52 4.5 -9 671.60 -69.4 -64.9 -69.6 61 -99 SPO 1997 04 25 23 15 52 4.4 -9 671.60 -69.3 -64.9 -69.6 61 -99 SPO 1997 04 25 23 16 53 4.3 -9 671.60 -69.3 -64.8 -69.6 60 -99 SPO 1997 04 25 23 17 53 4.2 -9 671.60 -69.3 -64.8 -69.6 61 -99 SPO 1997 04 25 23 18 53 4.3 -9 671.60 -69.3 -64.8 -69.5 61 -99 SPO 1997 04 25 23 19 52 4.2 -9 671.60 -69.2 -64.9 -69.5 60 -99 SPO 1997 04 25 23 20 50 4.1 -9 671.60 -69.2 -64.9 -69.5 60 -99 SPO 1997 04 25 23 21 50 4.1 -9 671.70 -69.2 -65.0 -69.4 61 -99 SPO 1997 04 25 23 22 51 4.0 -9 671.70 -69.2 -65.1 -69.4 61 -99 SPO 1997 04 25 23 23 51 4.0 -9 671.60 -69.2 -65.3 -69.4 62 -99 SPO 1997 04 25 23 24 51 4.1 -9 671.60 -69.2 -65.4 -69.4 63 -99 SPO 1997 04 25 23 25 50 4.0 -9 671.60 -69.2 -65.5 -69.4 63 -99 SPO 1997 04 25 23 26 52 3.9 -9 671.60 -69.1 -65.5 -69.4 62 -99 SPO 1997 04 25 23 27 50 3.9 -9 671.60 -69.1 -65.5 -69.3 62 -99 SPO 1997 04 25 23 28 54 3.7 -9 671.70 -69.0 -65.5 -69.3 62 -99 SPO 1997 04 25 23 29 57 3.5 -9 671.70 -69.0 -65.6 -69.3 62 -99 SPO 1997 04 25 23 30 59 3.3 -9 671.70 -69.1 -65.6 -69.3 62 -99 SPO 1997 04 25 23 31 61 3.1 -9 671.70 -69.1 -65.8 -69.4 62 -99 SPO 1997 04 25 23 32 62 3.0 -9 671.80 -69.2 -65.9 -69.4 63 -99 SPO 1997 04 25 23 33 64 3.0 -9 671.80 -69.2 -65.9 -69.4 64 -99 SPO 1997 04 25 23 34 66 3.0 -9 671.80 -69.2 -66.0 -69.4 64 -99 SPO 1997 04 25 23 35 67 3.1 -9 671.70 -69.2 -66.1 -69.4 64 -99 SPO 1997 04 25 23 36 66 3.3 -9 671.70 -69.2 -66.1 -69.4 64 -99 SPO 1997 04 25 23 37 66 3.4 -9 671.70 -69.4 -66.1 -69.5 66 -99 SPO 1997 04 25 23 38 66 3.4 -9 671.80 -69.4 -66.1 -69.5 65 -99 SPO 1997 04 25 23 39 64 3.5 -9 671.80 -69.4 -66.1 -69.5 65 -99 SPO 1997 04 25 23 40 63 3.5 -9 671.80 -69.4 -66.2 -69.5 65 -99 SPO 1997 04 25 23 41 62 3.5 -9 671.80 -69.4 -66.2 -69.4 64 -99 SPO 1997 04 25 23 42 62 3.8 -9 671.80 -69.3 -66.1 -69.4 64 -99 SPO 1997 04 25 23 43 60 4.0 -9 671.80 -69.4 -65.9 -69.5 64 -99 SPO 1997 04 25 23 44 61 4.0 -9 671.80 -69.5 -65.9 -69.6 65 -99 SPO 1997 04 25 23 45 62 3.9 -9 671.80 -69.6 -65.9 -69.6 66 -99 SPO 1997 04 25 23 46 61 4.0 -9 671.80 -69.6 -65.8 -69.7 66 -99 SPO 1997 04 25 23 47 61 4.0 -9 671.80 -69.7 -65.6 -69.7 67 -99 SPO 1997 04 25 23 48 60 3.9 -9 671.80 -69.7 -65.7 -69.7 66 -99 SPO 1997 04 25 23 49 61 3.8 -9 671.80 -69.8 -65.6 -69.8 66 -99 SPO 1997 04 25 23 50 62 3.7 -9 671.80 -69.8 -65.6 -69.8 65 -99 SPO 1997 04 25 23 51 62 3.5 -9 671.80 -69.9 -65.6 -69.8 66 -99 SPO 1997 04 25 23 52 61 3.4 -9 671.90 -69.9 -65.7 -69.8 65 -99 SPO 1997 04 25 23 53 61 3.4 -9 671.90 -69.8 -65.7 -69.8 64 -99 SPO 1997 04 25 23 54 61 3.4 -9 671.90 -69.8 -65.7 -69.8 64 -99 SPO 1997 04 25 23 55 59 3.3 -9 671.90 -69.8 -65.7 -69.8 64 -99 SPO 1997 04 25 23 56 58 3.3 -9 671.90 -69.8 -65.8 -69.8 64 -99 SPO 1997 04 25 23 57 59 3.4 -9 671.90 -69.8 -65.8 -69.8 65 -99 SPO 1997 04 25 23 58 58 3.5 -9 671.90 -69.8 -65.8 -69.8 -99 -99 SPO 1997 04 25 23 59 60 3.6 -9 671.90 -69.8 -65.7 -69.8 -99 -99 SPO 1997 04 26 00 00 -999 -99.9 -9 671.80 -69.9 -65.6 -69.9 -99 0 SPO 1997 04 26 00 01 58 3.6 -9 671.90 -69.9 -65.6 -69.9 -99 -99 SPO 1997 04 26 00 02 59 3.3 -9 671.90 -69.9 -65.8 -69.9 -99 -99 SPO 1997 04 26 00 03 63 3.1 -9 672.00 -69.9 -65.8 -69.9 -99 -99 SPO 1997 04 26 00 04 64 3.1 -9 672.00 -69.9 -65.7 -69.9 -99 -99 SPO 1997 04 26 00 05 64 3.3 -9 672.00 -70.0 -65.6 -69.9 -99 -99 SPO 1997 04 26 00 06 65 3.3 -9 672.00 -70.0 -65.5 -70.0 -99 -99 SPO 1997 04 26 00 07 65 3.2 -9 672.00 -70.2 -65.5 -70.0 -99 -99 SPO 1997 04 26 00 08 68 3.1 -9 672.10 -70.4 -65.5 -70.1 -99 -99 SPO 1997 04 26 00 09 68 3.0 -9 672.10 -70.6 -65.6 -70.2 -99 -99 SPO 1997 04 26 00 10 69 3.1 -9 672.10 -70.6 -65.6 -70.3 -99 -99 SPO 1997 04 26 00 11 68 3.0 -9 672.10 -70.7 -65.5 -70.4 -99 -99 SPO 1997 04 26 00 12 67 3.1 -9 672.10 -70.7 -65.4 -70.4 -99 -99 SPO 1997 04 26 00 13 67 3.2 -9 672.00 -70.7 -65.4 -70.4 66 -99 SPO 1997 04 26 00 14 70 3.3 -9 672.00 -70.7 -65.3 -70.4 65 -99 SPO 1997 04 26 00 15 70 3.3 -9 672.00 -70.7 -65.3 -70.4 64 -99 SPO 1997 04 26 00 16 70 3.3 -9 672.00 -70.8 -65.4 -70.5 65 -99 SPO 1997 04 26 00 17 67 3.6 -9 672.00 -70.9 -65.4 -70.6 66 -99 SPO 1997 04 26 00 18 63 3.7 -9 672.00 -71.0 -65.2 -70.6 67 -99 SPO 1997 04 26 00 19 59 4.1 -9 672.00 -70.8 -65.3 -70.6 65 -99 SPO 1997 04 26 00 20 60 4.2 -9 672.00 -70.7 -65.1 -70.5 64 -99 SPO 1997 04 26 00 21 60 4.3 -9 672.00 -70.5 -65.2 -70.5 63 -99 SPO 1997 04 26 00 22 62 4.2 -9 672.00 -70.6 -65.0 -70.5 65 -99 SPO 1997 04 26 00 23 60 4.3 -9 672.00 -70.6 -64.8 -70.5 64 -99 SPO 1997 04 26 00 24 57 4.4 -9 672.00 -70.6 -64.8 -70.5 64 -99 SPO 1997 04 26 00 25 61 4.2 -9 672.00 -70.3 -64.9 -70.4 61 -99 SPO 1997 04 26 00 26 62 4.4 -9 672.00 -70.2 -64.8 -70.3 61 -99 SPO 1997 04 26 00 27 64 4.3 -9 672.00 -70.1 -64.8 -70.2 61 -99 SPO 1997 04 26 00 28 66 4.1 -9 672.10 -70.2 -64.9 -70.3 61 -99 SPO 1997 04 26 00 29 68 4.0 -9 672.10 -70.2 -64.8 -70.3 61 -99 SPO 1997 04 26 00 30 70 3.9 -9 672.10 -70.2 -64.9 -70.3 63 -99 SPO 1997 04 26 00 31 73 3.7 -9 672.20 -70.2 -65.0 -70.3 63 -99 SPO 1997 04 26 00 32 74 3.9 -9 672.20 -70.3 -65.0 -70.3 65 -99 SPO 1997 04 26 00 33 75 3.9 -9 672.20 -70.3 -64.9 -70.4 65 -99 SPO 1997 04 26 00 34 73 4.0 -9 672.10 -70.4 -64.9 -70.4 66 -99 SPO 1997 04 26 00 35 71 4.1 -9 672.10 -70.4 -65.0 -70.5 65 -99 SPO 1997 04 26 00 36 69 4.2 -9 672.10 -70.5 -65.2 -70.5 64 -99 SPO 1997 04 26 00 37 68 4.2 -9 672.10 -70.5 -65.3 -70.5 63 -99 SPO 1997 04 26 00 38 68 4.4 -9 672.10 -70.4 -65.1 -70.4 62 -99 SPO 1997 04 26 00 39 68 4.5 -9 672.00 -70.2 -64.8 -70.4 61 -99 SPO 1997 04 26 00 40 66 4.3 -9 672.00 -70.1 -64.9 -70.3 61 -99 SPO 1997 04 26 00 41 66 4.3 -9 672.00 -70.0 -65.0 -70.2 61 -99 SPO 1997 04 26 00 42 67 4.3 -9 672.00 -70.0 -64.9 -70.2 61 -99 SPO 1997 04 26 00 43 67 4.4 -9 672.00 -69.9 -64.9 -70.1 62 -99 SPO 1997 04 26 00 44 66 4.2 -9 672.00 -69.9 -64.9 -70.1 62 -99 SPO 1997 04 26 00 45 66 4.1 -9 672.00 -69.8 -65.0 -70.1 61 -99 SPO 1997 04 26 00 46 66 4.5 -9 672.00 -69.8 -65.0 -70.0 61 -99 SPO 1997 04 26 00 47 63 4.3 -9 672.00 -69.7 -65.0 -70.0 61 -99 SPO 1997 04 26 00 48 60 5.0 -9 672.00 -69.7 -64.7 -70.0 61 -99 SPO 1997 04 26 00 49 59 4.1 -9 671.90 -69.6 -64.9 -69.9 60 -99 SPO 1997 04 26 00 50 57 4.0 -9 672.00 -69.6 -65.2 -69.8 61 -99 SPO 1997 04 26 00 51 57 4.0 -9 672.00 -69.6 -65.0 -69.8 61 -99 SPO 1997 04 26 00 52 54 3.8 -9 672.00 -69.4 -65.2 -69.7 62 -99 SPO 1997 04 26 00 53 54 4.1 -9 672.00 -69.2 -65.1 -69.5 60 -99 SPO 1997 04 26 00 54 51 4.0 -9 671.90 -69.0 -65.0 -69.4 59 -99 SPO 1997 04 26 00 55 48 4.3 -9 671.90 -68.9 -65.1 -69.2 61 -99 SPO 1997 04 26 00 56 48 4.0 -9 672.00 -68.6 -65.2 -69.0 59 -99 SPO 1997 04 26 00 57 47 4.0 -9 672.00 -68.4 -65.2 -68.7 59 -99 SPO 1997 04 26 00 58 47 4.1 -9 672.00 -68.3 -65.2 -68.7 59 -99 SPO 1997 04 26 00 59 47 4.2 -9 671.90 -68.0 -65.3 -68.4 58 -99 SPO 1997 04 26 01 00 47 4.3 -9 671.90 -67.8 -65.2 -68.2 57 0 SPO 1997 04 26 01 01 48 4.3 -9 671.90 -67.8 -65.4 -68.2 58 -99 SPO 1997 04 26 01 02 48 4.1 -9 671.90 -67.7 -65.3 -68.1 59 -99 SPO 1997 04 26 01 03 49 4.2 -9 671.90 -67.8 -65.3 -68.2 61 -99 SPO 1997 04 26 01 04 50 3.9 -9 671.90 -67.8 -65.3 -68.2 61 -99 SPO 1997 04 26 01 05 50 4.0 -9 671.90 -67.9 -65.2 -68.2 63 -99 SPO 1997 04 26 01 06 51 4.0 -9 671.90 -67.9 -65.2 -68.3 64 -99 SPO 1997 04 26 01 07 51 3.8 -9 671.90 -67.9 -65.2 -68.2 65 -99 SPO 1997 04 26 01 08 54 3.9 -9 671.90 -67.9 -65.0 -68.2 65 -99 SPO 1997 04 26 01 09 54 3.8 -9 672.00 -67.8 -65.2 -68.2 64 -99 SPO 1997 04 26 01 10 54 3.5 -9 672.00 -67.8 -65.4 -68.2 64 -99 SPO 1997 04 26 01 11 54 3.3 -9 672.00 -67.9 -65.5 -68.2 65 -99 SPO 1997 04 26 01 12 53 3.2 -9 672.00 -67.9 -65.7 -68.2 65 -99 SPO 1997 04 26 01 13 53 3.2 -9 672.00 -67.9 -65.7 -68.2 65 -99 SPO 1997 04 26 01 14 52 3.4 -9 672.00 -68.0 -65.7 -68.2 66 -99 SPO 1997 04 26 01 15 51 3.3 -9 672.00 -68.0 -65.7 -68.2 67 -99 SPO 1997 04 26 01 16 50 3.3 -9 672.00 -68.0 -65.6 -68.2 67 -99 SPO 1997 04 26 01 17 51 3.1 -9 672.00 -67.8 -65.6 -68.0 65 -99 SPO 1997 04 26 01 18 52 3.1 -9 672.00 -67.7 -65.7 -67.9 65 -99 SPO 1997 04 26 01 19 54 3.0 -9 672.00 -67.7 -65.6 -68.0 66 -99 SPO 1997 04 26 01 20 56 2.8 -9 672.00 -67.8 -65.7 -68.0 67 -99 SPO 1997 04 26 01 21 61 2.8 -9 672.00 -67.8 -65.7 -68.0 67 -99 SPO 1997 04 26 01 22 63 2.7 -9 672.10 -67.9 -65.7 -68.0 67 -99 SPO 1997 04 26 01 23 64 2.5 -9 672.10 -68.0 -65.6 -68.1 68 -99 SPO 1997 04 26 01 24 70 2.2 -9 672.20 -68.0 -65.7 -68.2 67 -99 SPO 1997 04 26 01 25 75 2.0 -9 672.20 -68.1 -65.8 -68.2 68 -99 SPO 1997 04 26 01 26 77 2.0 -9 672.20 -68.2 -65.9 -68.2 69 -99 SPO 1997 04 26 01 27 78 2.0 -9 672.20 -68.3 -66.0 -68.2 70 -99 SPO 1997 04 26 01 28 79 2.1 -9 672.20 -68.3 -66.0 -68.3 70 -99 SPO 1997 04 26 01 29 79 2.2 -9 672.20 -68.4 -66.1 -68.3 71 -99 SPO 1997 04 26 01 30 76 2.5 -9 672.20 -68.5 -66.1 -68.3 72 -99 SPO 1997 04 26 01 31 72 2.6 -9 672.20 -68.6 -66.0 -68.4 72 -99 SPO 1997 04 26 01 32 70 2.7 -9 672.20 -68.7 -66.0 -68.4 71 -99 SPO 1997 04 26 01 33 70 2.7 -9 672.20 -68.8 -65.9 -68.5 71 -99 SPO 1997 04 26 01 34 70 2.7 -9 672.20 -68.9 -65.8 -68.6 71 -99 SPO 1997 04 26 01 35 71 2.7 -9 672.20 -69.0 -65.7 -68.6 71 -99 SPO 1997 04 26 01 36 71 2.7 -9 672.20 -69.2 -65.7 -68.7 71 -99 SPO 1997 04 26 01 37 69 2.8 -9 672.20 -69.2 -65.7 -68.8 71 -99 SPO 1997 04 26 01 38 68 3.0 -9 672.10 -69.3 -65.5 -68.8 71 -99 SPO 1997 04 26 01 39 68 3.0 -9 672.10 -69.4 -65.4 -68.9 71 -99 SPO 1997 04 26 01 40 68 3.0 -9 672.10 -69.4 -65.3 -68.9 71 -99 SPO 1997 04 26 01 41 69 3.1 -9 672.10 -69.5 -65.3 -69.0 71 -99 SPO 1997 04 26 01 42 68 3.1 -9 672.10 -69.5 -65.4 -69.0 71 -99 SPO 1997 04 26 01 43 67 3.2 -9 672.10 -69.5 -65.4 -69.0 71 -99 SPO 1997 04 26 01 44 65 3.3 -9 672.10 -69.5 -65.5 -69.1 71 -99 SPO 1997 04 26 01 45 64 3.4 -9 672.10 -69.4 -65.5 -69.1 68 -99 SPO 1997 04 26 01 46 64 3.4 -9 672.10 -69.3 -65.4 -69.1 67 -99 SPO 1997 04 26 01 47 66 3.3 -9 672.10 -69.3 -65.4 -69.1 66 -99 SPO 1997 04 26 01 48 68 3.2 -9 672.10 -69.3 -65.3 -69.1 66 -99 SPO 1997 04 26 01 49 68 3.2 -9 672.10 -69.3 -65.3 -69.1 66 -99 SPO 1997 04 26 01 50 66 3.3 -9 672.00 -69.4 -65.2 -69.1 67 -99 SPO 1997 04 26 01 51 63 3.5 -9 672.00 -69.4 -65.2 -69.2 67 -99 SPO 1997 04 26 01 52 61 3.6 -9 672.00 -69.4 -65.2 -69.2 67 -99 SPO 1997 04 26 01 53 61 3.6 -9 672.00 -69.4 -65.1 -69.2 67 -99 SPO 1997 04 26 01 54 59 3.7 -9 672.00 -69.4 -65.1 -69.2 66 -99 SPO 1997 04 26 01 55 59 3.7 -9 672.00 -69.4 -65.1 -69.3 66 -99 SPO 1997 04 26 01 56 60 3.8 -9 672.00 -69.4 -65.0 -69.2 66 -99 SPO 1997 04 26 01 57 59 3.8 -9 672.00 -69.3 -65.0 -69.2 65 -99 SPO 1997 04 26 01 58 61 3.7 -9 672.00 -69.3 -65.0 -69.2 65 -99 SPO 1997 04 26 01 59 62 3.7 -9 672.00 -69.2 -65.1 -69.1 64 -99 SPO 1997 04 26 02 00 62 3.7 -9 672.00 -69.1 -65.1 -69.1 63 0 SPO 1997 04 26 02 01 61 3.8 -9 672.00 -69.0 -65.0 -69.1 63 -99 SPO 1997 04 26 02 02 62 3.9 -9 672.00 -69.0 -65.0 -69.1 64 -99 SPO 1997 04 26 02 03 62 4.0 -9 671.90 -68.9 -64.9 -69.0 65 -99 SPO 1997 04 26 02 04 64 4.0 -9 671.90 -68.9 -64.9 -69.0 66 -99 SPO 1997 04 26 02 05 65 4.0 -9 671.90 -68.8 -64.9 -69.0 65 -99 SPO 1997 04 26 02 06 67 4.1 -9 671.90 -68.8 -64.8 -68.9 65 -99 SPO 1997 04 26 02 07 65 4.1 -9 671.90 -68.7 -64.8 -68.9 64 -99 SPO 1997 04 26 02 08 64 4.1 -9 671.90 -68.6 -64.7 -68.8 63 -99 SPO 1997 04 26 02 09 63 4.0 -9 672.00 -68.5 -64.6 -68.7 63 -99 SPO 1997 04 26 02 10 62 4.0 -9 672.00 -68.4 -64.7 -68.7 62 -99 SPO 1997 04 26 02 11 62 3.9 -9 672.00 -68.4 -64.7 -68.6 62 -99 SPO 1997 04 26 02 12 63 4.0 -9 672.00 -68.3 -64.8 -68.6 62 -99 SPO 1997 04 26 02 13 61 4.1 -9 672.00 -68.3 -64.6 -68.5 63 -99 SPO 1997 04 26 02 14 60 4.2 -9 672.00 -68.2 -64.6 -68.5 64 -99 SPO 1997 04 26 02 15 60 3.9 -9 672.00 -68.2 -64.5 -68.4 64 -99 SPO 1997 04 26 02 16 60 3.9 -9 672.00 -68.1 -64.5 -68.4 64 -99 SPO 1997 04 26 02 17 59 3.8 -9 672.00 -68.0 -64.6 -68.3 64 -99 SPO 1997 04 26 02 18 60 4.0 -9 672.00 -67.9 -64.4 -68.2 64 -99 SPO 1997 04 26 02 19 61 3.9 -9 672.00 -67.8 -64.5 -68.1 63 -99 SPO 1997 04 26 02 20 60 3.7 -9 672.00 -67.7 -64.5 -68.1 64 -99 SPO 1997 04 26 02 21 61 3.6 -9 672.00 -67.7 -64.5 -68.0 64 -99 SPO 1997 04 26 02 22 62 3.7 -9 672.00 -67.7 -64.5 -68.0 64 -99 SPO 1997 04 26 02 23 62 3.2 -9 672.00 -67.7 -64.6 -68.0 64 -99 SPO 1997 04 26 02 24 60 3.5 -9 672.00 -67.8 -64.7 -68.1 65 -99 SPO 1997 04 26 02 25 59 3.2 -9 672.00 -67.7 -64.9 -68.0 64 -99 SPO 1997 04 26 02 26 58 3.4 -9 672.00 -67.7 -64.9 -67.9 65 -99 SPO 1997 04 26 02 27 60 4.1 -9 672.00 -67.6 -64.8 -67.9 65 -99 SPO 1997 04 26 02 28 58 3.9 -9 672.00 -67.5 -64.9 -67.8 66 -99 SPO 1997 04 26 02 29 58 4.0 -9 672.00 -67.4 -65.2 -67.6 65 -99 SPO 1997 04 26 02 30 58 4.3 -9 672.00 -67.2 -64.7 -67.5 64 -99 SPO 1997 04 26 02 31 58 4.2 -9 672.00 -67.2 -65.0 -67.4 65 -99 SPO 1997 04 26 02 32 54 4.1 -9 671.90 -67.1 -65.2 -67.4 64 -99 SPO 1997 04 26 02 33 54 4.1 -9 671.90 -67.2 -65.1 -67.5 65 -99 SPO 1997 04 26 02 34 54 4.1 -9 671.90 -67.4 -65.2 -67.6 67 -99 SPO 1997 04 26 02 35 52 4.3 -9 671.90 -67.3 -65.2 -67.5 66 -99 SPO 1997 04 26 02 36 51 4.4 -9 671.90 -67.3 -65.2 -67.5 67 -99 SPO 1997 04 26 02 37 49 4.5 -9 671.80 -67.2 -64.9 -67.4 66 -99 SPO 1997 04 26 02 38 49 4.6 -9 671.80 -67.2 -64.9 -67.4 66 -99 SPO 1997 04 26 02 39 49 4.5 -9 671.80 -67.3 -64.8 -67.5 67 -99 SPO 1997 04 26 02 40 50 4.6 -9 671.80 -67.3 -64.7 -67.5 67 -99 SPO 1997 04 26 02 41 49 4.7 -9 671.80 -67.3 -64.7 -67.4 67 -99 SPO 1997 04 26 02 42 48 4.7 -9 671.80 -67.2 -64.6 -67.4 65 -99 SPO 1997 04 26 02 43 49 4.6 -9 671.80 -67.2 -64.6 -67.3 65 -99 SPO 1997 04 26 02 44 49 4.5 -9 671.80 -67.2 -64.6 -67.4 65 -99 SPO 1997 04 26 02 45 48 4.4 -9 671.80 -67.2 -64.5 -67.4 65 -99 SPO 1997 04 26 02 46 48 4.4 -9 671.80 -67.2 -64.5 -67.3 66 -99 SPO 1997 04 26 02 47 48 4.2 -9 671.80 -67.1 -64.6 -67.3 67 -99 SPO 1997 04 26 02 48 48 4.2 -9 671.80 -67.0 -64.7 -67.2 67 -99 SPO 1997 04 26 02 49 49 4.2 -9 671.80 -66.8 -64.7 -67.0 65 -99 SPO 1997 04 26 02 50 50 4.0 -9 671.80 -66.8 -64.7 -67.0 65 -99 SPO 1997 04 26 02 51 48 4.2 -9 671.80 -66.8 -64.8 -67.0 65 -99 SPO 1997 04 26 02 52 47 4.2 -9 671.80 -66.8 -64.6 -67.0 65 -99 SPO 1997 04 26 02 53 45 4.4 -9 671.80 -66.8 -64.6 -67.0 65 -99 SPO 1997 04 26 02 54 45 4.3 -9 671.80 -66.8 -64.7 -66.9 65 -99 SPO 1997 04 26 02 55 46 4.3 -9 671.80 -66.7 -64.7 -66.9 65 -99 SPO 1997 04 26 02 56 45 4.4 -9 671.80 -66.7 -64.8 -66.9 65 -99 SPO 1997 04 26 02 57 45 4.3 -9 671.80 -66.7 -64.7 -66.8 66 -99 SPO 1997 04 26 02 58 46 4.2 -9 671.80 -66.6 -64.8 -66.8 67 -99 SPO 1997 04 26 02 59 46 4.4 -9 671.80 -66.6 -64.8 -66.8 67 -99 SPO 1997 04 26 03 00 45 4.3 -9 671.80 -66.5 -64.7 -66.7 66 0 SPO 1997 04 26 03 01 47 4.3 -9 671.80 -66.5 -64.8 -66.7 67 -99 SPO 1997 04 26 03 02 48 4.0 -9 671.80 -66.4 -64.7 -66.7 66 -99 SPO 1997 04 26 03 03 47 4.2 -9 671.80 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 04 47 4.3 -9 671.70 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 05 47 4.4 -9 671.70 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 06 47 4.4 -9 671.70 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 07 47 4.4 -9 671.70 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 08 47 4.4 -9 671.70 -66.5 -64.7 -66.7 67 -99 SPO 1997 04 26 03 09 45 4.3 -9 671.70 -66.5 -64.8 -66.6 67 -99 SPO 1997 04 26 03 10 44 4.3 -9 671.70 -66.5 -64.8 -66.6 67 -99 SPO 1997 04 26 03 11 43 4.2 -9 671.70 -66.5 -64.8 -66.6 67 -99 SPO 1997 04 26 03 12 43 4.3 -9 671.70 -66.5 -64.8 -66.6 67 -99 SPO 1997 04 26 03 13 43 4.1 -9 671.70 -66.4 -64.8 -66.6 66 -99 SPO 1997 04 26 03 14 43 4.1 -9 671.70 -66.4 -64.7 -66.5 66 -99 SPO 1997 04 26 03 15 42 4.0 -9 671.70 -66.3 -64.7 -66.4 66 -99 SPO 1997 04 26 03 16 43 3.7 -9 671.70 -66.2 -64.6 -66.3 66 -99 SPO 1997 04 26 03 17 43 3.8 -9 671.70 -66.1 -64.6 -66.3 66 -99 SPO 1997 04 26 03 18 43 3.9 -9 671.80 -66.0 -64.6 -66.2 65 -99 SPO 1997 04 26 03 19 43 3.8 -9 671.80 -66.0 -64.6 -66.2 65 -99 SPO 1997 04 26 03 20 43 3.8 -9 671.80 -65.9 -64.5 -66.1 66 -99 SPO 1997 04 26 03 21 43 3.7 -9 671.80 -65.8 -64.4 -66.0 66 -99 SPO 1997 04 26 03 22 41 3.9 -9 671.80 -65.7 -64.4 -66.0 66 -99 SPO 1997 04 26 03 23 42 4.0 -9 671.70 -65.6 -64.4 -65.8 66 -99 SPO 1997 04 26 03 24 43 4.1 -9 671.70 -65.4 -64.4 -65.7 66 -99 SPO 1997 04 26 03 25 43 4.1 -9 671.70 -65.4 -64.5 -65.6 67 -99 SPO 1997 04 26 03 26 41 3.9 -9 671.70 -65.4 -64.5 -65.7 67 -99 SPO 1997 04 26 03 27 40 4.0 -9 671.70 -65.5 -64.5 -65.7 67 -99 SPO 1997 04 26 03 28 41 3.8 -9 671.70 -65.5 -64.5 -65.7 68 -99 SPO 1997 04 26 03 29 41 3.8 -9 671.70 -65.5 -64.5 -65.7 68 -99 SPO 1997 04 26 03 30 42 3.9 -9 671.70 -65.5 -64.5 -65.7 68 -99 SPO 1997 04 26 03 31 42 3.8 -9 671.70 -65.4 -64.5 -65.7 68 -99 SPO 1997 04 26 03 32 44 3.8 -9 671.70 -65.4 -64.5 -65.6 68 -99 SPO 1997 04 26 03 33 46 3.7 -9 671.70 -65.4 -64.6 -65.6 70 -99 SPO 1997 04 26 03 34 46 3.8 -9 671.70 -65.4 -64.6 -65.7 70 -99 SPO 1997 04 26 03 35 45 3.9 -9 671.70 -65.5 -64.6 -65.7 71 -99 SPO 1997 04 26 03 36 44 3.8 -9 671.70 -65.6 -64.7 -65.8 72 -99 SPO 1997 04 26 03 37 45 4.0 -9 671.80 -65.6 -64.8 -65.8 70 -99 SPO 1997 04 26 03 38 45 3.9 -9 671.80 -65.6 -64.8 -65.8 70 -99 SPO 1997 04 26 03 39 45 3.7 -9 671.80 -65.7 -64.9 -65.8 71 -99 SPO 1997 04 26 03 40 43 3.7 -9 671.70 -65.6 -64.9 -65.8 70 -99 SPO 1997 04 26 03 41 42 3.7 -9 671.70 -65.6 -64.8 -65.7 69 -99 SPO 1997 04 26 03 42 42 3.9 -9 671.70 -65.6 -64.8 -65.7 69 -99 SPO 1997 04 26 03 43 42 4.2 -9 671.70 -65.6 -64.8 -65.7 69 -99 SPO 1997 04 26 03 44 42 4.1 -9 671.70 -65.5 -64.8 -65.6 69 -99 SPO 1997 04 26 03 45 43 4.1 -9 671.70 -65.5 -64.8 -65.6 69 -99 SPO 1997 04 26 03 46 43 4.1 -9 671.70 -65.5 -64.7 -65.6 71 -99 SPO 1997 04 26 03 47 43 4.0 -9 671.70 -65.4 -64.7 -65.6 70 -99 SPO 1997 04 26 03 48 43 4.1 -9 671.70 -65.4 -64.7 -65.6 68 -99 SPO 1997 04 26 03 49 43 4.2 -9 671.70 -65.4 -64.7 -65.6 68 -99 SPO 1997 04 26 03 50 43 4.1 -9 671.70 -65.4 -64.7 -65.6 68 -99 SPO 1997 04 26 03 51 43 4.1 -9 671.70 -65.4 -64.7 -65.5 68 -99 SPO 1997 04 26 03 52 41 4.0 -9 671.70 -65.4 -64.7 -65.5 68 -99 SPO 1997 04 26 03 53 41 4.1 -9 671.70 -65.3 -64.7 -65.4 68 -99 SPO 1997 04 26 03 54 41 4.2 -9 671.70 -65.2 -64.6 -65.4 68 -99 SPO 1997 04 26 03 55 39 4.2 -9 671.70 -65.2 -64.5 -65.3 69 -99 SPO 1997 04 26 03 56 39 4.3 -9 671.70 -65.1 -64.5 -65.2 68 -99 SPO 1997 04 26 03 57 38 4.3 -9 671.70 -65.0 -64.4 -65.2 68 -99 SPO 1997 04 26 03 58 39 4.1 -9 671.70 -64.9 -64.4 -65.1 68 -99 SPO 1997 04 26 03 59 38 4.2 -9 671.70 -64.8 -64.3 -65.0 67 -99 SPO 1997 04 26 04 00 37 4.2 -9 671.70 -64.7 -64.2 -65.0 66 0 SPO 1997 04 26 04 01 37 4.3 -9 671.80 -64.7 -64.2 -64.9 66 -99 SPO 1997 04 26 04 02 37 4.1 -9 671.80 -64.6 -64.1 -64.8 66 -99 SPO 1997 04 26 04 03 38 4.0 -9 671.80 -64.6 -64.1 -64.8 66 -99 SPO 1997 04 26 04 04 38 3.8 -9 671.80 -64.5 -64.1 -64.7 67 -99 SPO 1997 04 26 04 05 38 3.9 -9 671.80 -64.4 -64.1 -64.7 67 -99 SPO 1997 04 26 04 06 37 4.1 -9 671.80 -64.4 -64.0 -64.6 67 -99 SPO 1997 04 26 04 07 37 3.7 -9 671.80 -64.3 -64.0 -64.5 67 -99 SPO 1997 04 26 04 08 38 3.8 -9 671.80 -64.3 -64.0 -64.5 68 -99 SPO 1997 04 26 04 09 38 3.8 -9 671.80 -64.2 -64.0 -64.5 70 -99 SPO 1997 04 26 04 10 38 3.9 -9 671.80 -64.2 -63.9 -64.4 70 -99 SPO 1997 04 26 04 11 38 3.9 -9 671.80 -64.2 -63.9 -64.4 70 -99 SPO 1997 04 26 04 12 38 4.0 -9 671.80 -64.1 -63.8 -64.4 69 -99 SPO 1997 04 26 04 13 37 3.9 -9 671.80 -64.1 -63.8 -64.3 69 -99 SPO 1997 04 26 04 14 37 3.7 -9 671.90 -64.0 -63.8 -64.3 68 -99 SPO 1997 04 26 04 15 37 3.7 -9 671.90 -64.0 -63.8 -64.2 68 -99 SPO 1997 04 26 04 16 37 3.7 -9 671.90 -64.0 -63.7 -64.2 68 -99 SPO 1997 04 26 04 17 37 3.6 -9 671.90 -63.9 -63.7 -64.2 68 -99 SPO 1997 04 26 04 18 37 3.5 -9 671.90 -63.9 -63.7 -64.1 69 -99 SPO 1997 04 26 04 19 37 3.5 -9 671.90 -63.8 -63.7 -64.1 70 -99 SPO 1997 04 26 04 20 38 3.5 -9 671.90 -63.8 -63.7 -64.0 71 -99 SPO 1997 04 26 04 21 38 3.8 -9 671.90 -63.8 -63.7 -64.0 71 -99 SPO 1997 04 26 04 22 38 3.6 -9 671.90 -63.8 -63.7 -64.0 71 -99 SPO 1997 04 26 04 23 39 3.5 -9 671.90 -63.7 -63.7 -63.9 70 -99 SPO 1997 04 26 04 24 38 3.4 -9 671.90 -63.7 -63.7 -63.9 70 -99 SPO 1997 04 26 04 25 37 3.1 -9 671.90 -63.7 -63.6 -63.9 70 -99 SPO 1997 04 26 04 26 37 3.4 -9 671.90 -63.7 -63.6 -63.9 71 -99 SPO 1997 04 26 04 27 36 3.3 -9 671.90 -63.7 -63.6 -63.9 71 -99 SPO 1997 04 26 04 28 36 3.2 -9 671.90 -63.6 -63.5 -63.9 72 -99 SPO 1997 04 26 04 29 36 3.2 -9 671.90 -63.6 -63.5 -63.8 72 -99 SPO 1997 04 26 04 30 37 3.2 -9 671.90 -63.6 -63.4 -63.8 73 -99 SPO 1997 04 26 04 31 37 3.1 -9 671.90 -63.6 -63.4 -63.8 73 -99 SPO 1997 04 26 04 32 37 3.1 -9 671.90 -63.5 -63.4 -63.7 72 -99 SPO 1997 04 26 04 33 36 3.0 -9 672.00 -63.5 -63.4 -63.7 72 -99 SPO 1997 04 26 04 34 38 3.0 -9 672.00 -63.5 -63.4 -63.7 72 -99 SPO 1997 04 26 04 35 39 3.0 -9 672.00 -63.5 -63.5 -63.7 72 -99 SPO 1997 04 26 04 36 40 3.1 -9 671.90 -63.5 -63.5 -63.7 72 -99 SPO 1997 04 26 04 37 39 3.2 -9 671.90 -63.5 -63.5 -63.6 72 -99 SPO 1997 04 26 04 38 41 3.0 -9 671.90 -63.5 -63.5 -63.6 73 -99 SPO 1997 04 26 04 39 42 2.8 -9 671.90 -63.5 -63.5 -63.6 73 -99 SPO 1997 04 26 04 40 45 2.7 -9 672.00 -63.5 -63.4 -63.6 73 -99 SPO 1997 04 26 04 41 45 2.7 -9 672.00 -63.5 -63.4 -63.6 74 -99 SPO 1997 04 26 04 42 46 2.6 -9 672.00 -63.4 -63.4 -63.6 73 -99 SPO 1997 04 26 04 43 46 2.6 -9 672.00 -63.4 -63.4 -63.6 73 -99 SPO 1997 04 26 04 44 47 2.7 -9 672.00 -63.4 -63.4 -63.6 73 -99 SPO 1997 04 26 04 45 48 2.8 -9 672.10 -63.4 -63.4 -63.6 73 -99 SPO 1997 04 26 04 46 49 2.7 -9 672.10 -63.4 -63.4 -63.5 72 -99 SPO 1997 04 26 04 47 49 2.7 -9 672.10 -63.4 -63.4 -63.5 72 -99 SPO 1997 04 26 04 48 50 2.5 -9 672.10 -63.4 -63.4 -63.5 72 -99 SPO 1997 04 26 04 49 53 2.4 -9 672.10 -63.4 -63.5 -63.5 72 -99 SPO 1997 04 26 04 50 57 1.6 -9 672.20 -63.5 -63.6 -63.6 73 -99 SPO 1997 04 26 04 51 62 1.3 -9 672.20 -64.0 -63.6 -63.7 78 -99 SPO 1997 04 26 04 52 65 1.4 -9 672.20 -64.3 -63.7 -63.8 80 -99 SPO 1997 04 26 04 53 66 1.6 -9 672.20 -64.4 -63.7 -63.9 81 -99 SPO 1997 04 26 04 54 64 1.8 -9 672.20 -64.6 -63.7 -64.0 82 -99 SPO 1997 04 26 04 55 64 1.8 -9 672.20 -64.7 -63.7 -64.1 79 -99 SPO 1997 04 26 04 56 65 1.9 -9 672.20 -64.8 -63.7 -64.1 80 -99 SPO 1997 04 26 04 57 65 2.0 -9 672.20 -64.8 -63.7 -64.2 79 -99 SPO 1997 04 26 04 58 61 2.0 -9 672.10 -64.9 -63.7 -64.3 77 -99 SPO 1997 04 26 04 59 58 2.2 -9 672.10 -64.9 -63.7 -64.4 76 -99 SPO 1997 04 26 05 00 55 2.3 -9 672.10 -65.0 -63.6 -64.4 77 0 SPO 1997 04 26 05 01 55 2.4 -9 672.10 -65.0 -63.6 -64.5 76 -99 SPO 1997 04 26 05 02 57 2.3 -9 672.10 -65.0 -63.6 -64.6 74 -99 SPO 1997 04 26 05 03 58 2.4 -9 672.10 -65.0 -63.7 -64.6 74 -99 SPO 1997 04 26 05 04 58 2.5 -9 672.00 -65.0 -63.7 -64.6 74 -99 SPO 1997 04 26 05 05 57 2.4 -9 672.00 -64.9 -63.7 -64.7 73 -99 SPO 1997 04 26 05 06 57 2.4 -9 672.00 -64.9 -63.7 -64.6 73 -99 SPO 1997 04 26 05 07 59 2.5 -9 672.00 -64.9 -63.7 -64.6 72 -99 SPO 1997 04 26 05 08 60 2.3 -9 672.00 -64.8 -63.7 -64.6 71 -99 SPO 1997 04 26 05 09 59 2.7 -9 672.00 -64.8 -63.7 -64.6 70 -99 SPO 1997 04 26 05 10 56 2.7 -9 672.00 -64.8 -63.7 -64.6 70 -99 SPO 1997 04 26 05 11 55 2.8 -9 671.90 -64.7 -63.7 -64.6 69 -99 SPO 1997 04 26 05 12 54 3.0 -9 671.90 -64.6 -63.7 -64.6 69 -99 SPO 1997 04 26 05 13 54 3.0 -9 671.90 -64.6 -63.6 -64.5 70 -99 SPO 1997 04 26 05 14 55 2.9 -9 671.90 -64.5 -63.7 -64.5 69 -99 SPO 1997 04 26 05 15 54 2.9 -9 671.90 -64.5 -63.7 -64.5 69 -99 SPO 1997 04 26 05 16 56 2.6 -9 671.90 -64.4 -63.8 -64.4 69 -99 SPO 1997 04 26 05 17 56 2.6 -9 672.00 -64.4 -63.8 -64.4 69 -99 SPO 1997 04 26 05 18 57 2.6 -9 672.00 -64.3 -63.9 -64.4 68 -99 SPO 1997 04 26 05 19 58 2.7 -9 672.00 -64.3 -63.9 -64.4 68 -99 SPO 1997 04 26 05 20 57 2.6 -9 671.90 -64.3 -64.0 -64.3 68 -99 SPO 1997 04 26 05 21 54 2.6 -9 671.90 -64.2 -64.0 -64.3 67 -99 SPO 1997 04 26 05 22 53 2.7 -9 671.90 -64.2 -63.9 -64.3 67 -99 SPO 1997 04 26 05 23 52 2.8 -9 671.90 -64.2 -63.9 -64.3 67 -99 SPO 1997 04 26 05 24 50 2.8 -9 671.90 -64.2 -63.9 -64.2 70 -99 SPO 1997 04 26 05 25 48 2.8 -9 671.90 -64.1 -63.9 -64.2 69 -99 SPO 1997 04 26 05 26 47 3.0 -9 671.80 -64.0 -63.8 -64.2 69 -99 SPO 1997 04 26 05 27 45 3.0 -9 671.80 -64.0 -63.7 -64.1 69 -99 SPO 1997 04 26 05 28 43 3.2 -9 671.80 -63.9 -63.5 -64.0 69 -99 SPO 1997 04 26 05 29 44 2.9 -9 671.90 -63.8 -63.5 -63.9 68 -99 SPO 1997 04 26 05 30 45 2.8 -9 671.90 -63.7 -63.5 -63.9 67 -99 SPO 1997 04 26 05 31 44 2.7 -9 671.90 -63.6 -63.4 -63.8 66 -99 SPO 1997 04 26 05 32 44 2.7 -9 671.90 -63.6 -63.4 -63.8 66 -99 SPO 1997 04 26 05 33 43 2.6 -9 671.90 -63.4 -63.4 -63.6 66 -99 SPO 1997 04 26 05 34 43 2.8 -9 671.90 -63.3 -63.3 -63.6 66 -99 SPO 1997 04 26 05 35 44 3.0 -9 671.90 -63.2 -63.2 -63.4 65 -99 SPO 1997 04 26 05 36 45 2.6 -9 671.90 -63.0 -63.2 -63.4 67 -99 SPO 1997 04 26 05 37 44 2.8 -9 671.90 -63.0 -63.2 -63.4 68 -99 SPO 1997 04 26 05 38 44 2.9 -9 671.80 -63.0 -63.2 -63.4 68 -99 SPO 1997 04 26 05 39 43 2.9 -9 671.80 -63.0 -63.2 -63.3 68 -99 SPO 1997 04 26 05 40 44 3.0 -9 671.80 -63.0 -63.1 -63.3 69 -99 SPO 1997 04 26 05 41 43 2.9 -9 671.80 -62.9 -63.1 -63.2 69 -99 SPO 1997 04 26 05 42 44 3.0 -9 671.80 -62.9 -63.0 -63.2 68 -99 SPO 1997 04 26 05 43 41 3.1 -9 671.80 -62.8 -63.0 -63.1 68 -99 SPO 1997 04 26 05 44 44 2.9 -9 671.80 -62.8 -62.9 -63.1 68 -99 SPO 1997 04 26 05 45 43 3.1 -9 671.80 -62.8 -62.9 -63.0 70 -99 SPO 1997 04 26 05 46 43 3.3 -9 671.80 -62.8 -62.9 -63.0 71 -99 SPO 1997 04 26 05 47 41 3.3 -9 671.80 -62.7 -62.9 -63.0 70 -99 SPO 1997 04 26 05 48 38 3.8 -9 671.80 -62.7 -62.9 -62.9 70 -99 SPO 1997 04 26 05 49 41 3.7 -9 671.80 -62.6 -62.9 -62.9 70 -99 SPO 1997 04 26 05 50 40 3.7 -9 671.80 -62.7 -62.9 -62.9 71 -99 SPO 1997 04 26 05 51 41 3.8 -9 671.70 -62.7 -62.9 -62.9 72 -99 SPO 1997 04 26 05 52 39 3.8 -9 671.80 -62.7 -62.9 -62.8 74 -99 SPO 1997 04 26 05 53 39 3.9 -9 671.80 -62.7 -62.9 -62.8 72 -99 SPO 1997 04 26 05 54 38 3.7 -9 671.80 -62.6 -62.8 -62.8 71 -99 SPO 1997 04 26 05 55 40 3.5 -9 671.90 -62.5 -62.8 -62.7 69 -99 SPO 1997 04 26 05 56 42 3.2 -9 671.90 -62.5 -62.8 -62.7 70 -99 SPO 1997 04 26 05 57 45 3.2 -9 671.90 -62.5 -62.8 -62.7 69 -99 SPO 1997 04 26 05 58 46 3.2 -9 672.00 -62.5 -62.8 -62.7 70 -99 SPO 1997 04 26 05 59 46 3.4 -9 672.00 -62.5 -62.8 -62.7 72 -99 SPO 1997 04 26 06 00 47 3.3 -9 672.00 -62.5 -62.8 -62.7 72 0 SPO 1997 04 26 06 01 48 3.3 -9 672.00 -62.6 -62.8 -62.7 73 -99 SPO 1997 04 26 06 02 51 3.0 -9 672.00 -62.6 -62.8 -62.7 73 -99 SPO 1997 04 26 06 03 51 3.0 -9 672.10 -62.6 -62.9 -62.7 73 -99 SPO 1997 04 26 06 04 51 2.8 -9 672.10 -62.6 -63.0 -62.7 73 -99 SPO 1997 04 26 06 05 51 3.0 -9 672.10 -62.7 -63.0 -62.7 74 -99 SPO 1997 04 26 06 06 50 2.9 -9 672.10 -62.7 -63.0 -62.8 74 -99 SPO 1997 04 26 06 07 50 3.0 -9 672.10 -62.7 -63.0 -62.8 74 -99 SPO 1997 04 26 06 08 46 3.0 -9 672.10 -62.7 -63.0 -62.8 74 -99 SPO 1997 04 26 06 09 51 3.1 -9 672.10 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 10 52 2.9 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 11 51 2.8 -9 672.20 -62.6 -62.9 -62.7 74 -99 SPO 1997 04 26 06 12 52 2.9 -9 672.20 -62.6 -62.9 -62.7 75 -99 SPO 1997 04 26 06 13 55 2.9 -9 672.20 -62.6 -62.9 -62.7 75 -99 SPO 1997 04 26 06 14 55 2.9 -9 672.20 -62.6 -62.9 -62.7 75 -99 SPO 1997 04 26 06 15 55 2.9 -9 672.20 -62.6 -62.9 -62.7 75 -99 SPO 1997 04 26 06 16 55 2.9 -9 672.20 -62.6 -62.9 -62.7 74 -99 SPO 1997 04 26 06 17 58 2.8 -9 672.20 -62.6 -62.9 -62.7 74 -99 SPO 1997 04 26 06 18 57 2.7 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 19 57 3.0 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 20 58 3.0 -9 672.20 -62.7 -63.0 -62.7 74 -99 SPO 1997 04 26 06 21 58 3.0 -9 672.20 -62.7 -63.0 -62.7 74 -99 SPO 1997 04 26 06 22 57 3.0 -9 672.20 -62.7 -63.0 -62.7 74 -99 SPO 1997 04 26 06 23 57 2.9 -9 672.20 -62.7 -63.0 -62.7 74 -99 SPO 1997 04 26 06 24 53 2.9 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 25 53 2.9 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 26 54 2.8 -9 672.20 -62.6 -62.9 -62.7 74 -99 SPO 1997 04 26 06 27 57 2.5 -9 672.20 -62.6 -62.9 -62.6 74 -99 SPO 1997 04 26 06 28 58 2.5 -9 672.20 -62.6 -62.9 -62.7 74 -99 SPO 1997 04 26 06 29 55 2.6 -9 672.20 -62.6 -63.0 -62.7 73 -99 SPO 1997 04 26 06 30 55 2.8 -9 672.20 -62.7 -62.9 -62.7 74 -99 SPO 1997 04 26 06 31 54 2.8 -9 672.30 -62.6 -62.9 -62.7 71 -99 SPO 1997 04 26 06 32 54 2.9 -9 672.30 -62.6 -62.9 -62.6 71 -99 SPO 1997 04 26 06 33 55 2.7 -9 672.20 -62.6 -62.9 -62.6 73 -99 SPO 1997 04 26 06 34 53 2.9 -9 672.20 -62.6 -63.0 -62.6 73 -99 SPO 1997 04 26 06 35 51 2.9 -9 672.20 -62.6 -63.0 -62.7 74 -99 SPO 1997 04 26 06 36 51 2.8 -9 672.20 -62.6 -62.9 -62.6 74 -99 SPO 1997 04 26 06 37 51 3.0 -9 672.20 -62.6 -62.9 -62.6 74 -99 SPO 1997 04 26 06 38 51 3.1 -9 672.20 -62.6 -62.9 -62.6 74 -99 SPO 1997 04 26 06 39 49 3.2 -9 672.20 -62.6 -62.9 -62.6 74 -99 SPO 1997 04 26 06 40 51 3.0 -9 672.20 -62.5 -62.9 -62.6 72 -99 SPO 1997 04 26 06 41 52 3.1 -9 672.20 -62.5 -62.9 -62.6 72 -99 SPO 1997 04 26 06 42 51 3.0 -9 672.20 -62.5 -62.8 -62.6 72 -99 SPO 1997 04 26 06 43 51 3.2 -9 672.20 -62.5 -62.8 -62.6 72 -99 SPO 1997 04 26 06 44 48 3.3 -9 672.20 -62.5 -62.8 -62.6 73 -99 SPO 1997 04 26 06 45 48 3.1 -9 672.20 -62.4 -62.8 -62.6 72 -99 SPO 1997 04 26 06 46 48 3.1 -9 672.20 -62.4 -62.8 -62.5 72 -99 SPO 1997 04 26 06 47 47 3.2 -9 672.20 -62.4 -62.7 -62.5 72 -99 SPO 1997 04 26 06 48 46 3.2 -9 672.30 -62.4 -62.8 -62.5 72 -99 SPO 1997 04 26 06 49 45 3.3 -9 672.30 -62.4 -62.8 -62.5 72 -99 SPO 1997 04 26 06 50 45 3.1 -9 672.30 -62.4 -62.7 -62.5 72 -99 SPO 1997 04 26 06 51 48 2.9 -9 672.30 -62.3 -62.7 -62.4 71 -99 SPO 1997 04 26 06 52 48 2.8 -9 672.30 -62.3 -62.7 -62.4 71 -99 SPO 1997 04 26 06 53 50 2.8 -9 672.30 -62.3 -62.6 -62.4 72 -99 SPO 1997 04 26 06 54 51 3.1 -9 672.30 -62.3 -62.6 -62.4 72 -99 SPO 1997 04 26 06 55 51 3.0 -9 672.30 -62.2 -62.6 -62.4 72 -99 SPO 1997 04 26 06 56 51 3.0 -9 672.30 -62.1 -62.6 -62.3 71 -99 SPO 1997 04 26 06 57 52 3.0 -9 672.30 -62.1 -62.5 -62.3 73 -99 SPO 1997 04 26 06 58 51 3.0 -9 672.30 -62.2 -62.5 -62.3 74 -99 SPO 1997 04 26 06 59 49 2.9 -9 672.30 -62.2 -62.4 -62.3 74 -99 SPO 1997 04 26 07 00 49 3.0 -9 672.30 -62.1 -62.4 -62.3 73 0 SPO 1997 04 26 07 01 48 2.7 -9 672.30 -62.1 -62.4 -62.2 73 -99 SPO 1997 04 26 07 02 51 2.6 -9 672.30 -62.0 -62.4 -62.2 70 -99 SPO 1997 04 26 07 03 51 2.7 -9 672.30 -62.0 -62.4 -62.2 70 -99 SPO 1997 04 26 07 04 50 2.8 -9 672.30 -62.1 -62.4 -62.2 71 -99 SPO 1997 04 26 07 05 48 3.0 -9 672.30 -62.0 -62.4 -62.1 72 -99 SPO 1997 04 26 07 06 48 2.9 -9 672.30 -62.0 -62.4 -62.1 72 -99 SPO 1997 04 26 07 07 51 2.5 -9 672.30 -62.0 -62.4 -62.1 73 -99 SPO 1997 04 26 07 08 49 3.0 -9 672.30 -62.0 -62.4 -62.1 73 -99 SPO 1997 04 26 07 09 50 3.1 -9 672.30 -62.0 -62.3 -62.1 74 -99 SPO 1997 04 26 07 10 51 3.1 -9 672.30 -62.0 -62.3 -62.1 74 -99 SPO 1997 04 26 07 11 49 3.0 -9 672.30 -62.0 -62.3 -62.1 74 -99 SPO 1997 04 26 07 12 48 3.0 -9 672.30 -61.9 -62.3 -62.1 72 -99 SPO 1997 04 26 07 13 46 2.9 -9 672.30 -61.9 -62.3 -62.1 72 -99 SPO 1997 04 26 07 14 48 3.0 -9 672.30 -61.9 -62.2 -62.1 72 -99 SPO 1997 04 26 07 15 48 3.1 -9 672.30 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 16 46 3.4 -9 672.30 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 17 45 3.0 -9 672.30 -61.8 -62.2 -62.0 70 -99 SPO 1997 04 26 07 18 46 3.1 -9 672.40 -61.8 -62.2 -62.0 71 -99 SPO 1997 04 26 07 19 46 2.8 -9 672.40 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 20 48 2.5 -9 672.40 -61.8 -62.2 -62.0 72 -99 SPO 1997 04 26 07 21 47 2.8 -9 672.40 -61.8 -62.2 -62.0 72 -99 SPO 1997 04 26 07 22 46 3.0 -9 672.40 -61.8 -62.2 -61.9 72 -99 SPO 1997 04 26 07 23 45 2.8 -9 672.40 -61.8 -62.1 -61.9 73 -99 SPO 1997 04 26 07 24 45 2.9 -9 672.40 -61.8 -62.1 -61.9 73 -99 SPO 1997 04 26 07 25 45 2.7 -9 672.40 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 07 26 48 2.6 -9 672.50 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 07 27 50 2.4 -9 672.50 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 07 28 50 2.5 -9 672.50 -61.7 -62.0 -61.9 71 -99 SPO 1997 04 26 07 29 52 2.5 -9 672.50 -61.7 -62.1 -61.9 72 -99 SPO 1997 04 26 07 30 52 2.6 -9 672.50 -61.8 -62.0 -61.9 73 -99 SPO 1997 04 26 07 31 52 2.7 -9 672.50 -61.8 -62.0 -61.9 75 -99 SPO 1997 04 26 07 32 53 2.8 -9 672.50 -61.8 -62.0 -61.9 75 -99 SPO 1997 04 26 07 33 52 3.2 -9 672.50 -61.8 -62.1 -61.9 75 -99 SPO 1997 04 26 07 34 52 2.8 -9 672.50 -61.8 -62.1 -61.9 75 -99 SPO 1997 04 26 07 35 51 2.9 -9 672.50 -61.8 -62.1 -61.9 73 -99 SPO 1997 04 26 07 36 54 2.9 -9 672.50 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 07 37 56 2.6 -9 672.50 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 07 38 53 2.8 -9 672.50 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 07 39 54 2.8 -9 672.50 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 07 40 54 2.6 -9 672.50 -61.8 -62.2 -61.9 71 -99 SPO 1997 04 26 07 41 57 2.5 -9 672.50 -61.9 -62.1 -61.9 73 -99 SPO 1997 04 26 07 42 55 2.6 -9 672.50 -61.9 -62.2 -61.9 73 -99 SPO 1997 04 26 07 43 58 2.4 -9 672.50 -61.8 -62.2 -61.9 73 -99 SPO 1997 04 26 07 44 55 2.5 -9 672.50 -61.8 -62.2 -61.9 73 -99 SPO 1997 04 26 07 45 56 2.5 -9 672.50 -61.8 -62.1 -61.9 73 -99 SPO 1997 04 26 07 46 55 2.6 -9 672.50 -61.9 -62.1 -61.9 73 -99 SPO 1997 04 26 07 47 57 2.5 -9 672.50 -61.9 -62.1 -61.9 73 -99 SPO 1997 04 26 07 48 59 2.4 -9 672.50 -61.8 -62.2 -61.9 71 -99 SPO 1997 04 26 07 49 59 2.5 -9 672.50 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 07 50 59 2.5 -9 672.50 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 07 51 56 2.4 -9 672.50 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 52 57 2.5 -9 672.50 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 53 58 2.8 -9 672.50 -61.9 -62.2 -62.0 73 -99 SPO 1997 04 26 07 54 53 3.1 -9 672.40 -62.0 -62.2 -62.0 74 -99 SPO 1997 04 26 07 55 53 3.3 -9 672.40 -61.9 -62.2 -62.0 73 -99 SPO 1997 04 26 07 56 50 3.2 -9 672.40 -62.0 -62.2 -62.0 74 -99 SPO 1997 04 26 07 57 50 3.5 -9 672.40 -61.9 -62.2 -62.0 73 -99 SPO 1997 04 26 07 58 50 3.6 -9 672.40 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 07 59 50 3.2 -9 672.40 -61.9 -62.2 -62.0 72 -99 SPO 1997 04 26 08 00 52 3.4 -9 672.40 -61.9 -62.1 -62.0 72 0 SPO 1997 04 26 08 01 52 3.0 -9 672.50 -61.9 -62.1 -62.0 72 -99 SPO 1997 04 26 08 02 51 2.8 -9 672.50 -61.9 -62.1 -61.9 72 -99 SPO 1997 04 26 08 03 51 2.9 -9 672.50 -61.8 -62.1 -61.9 71 -99 SPO 1997 04 26 08 04 51 2.9 -9 672.50 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 08 05 52 3.2 -9 672.40 -61.9 -62.2 -61.9 72 -99 SPO 1997 04 26 08 06 50 3.3 -9 672.40 -61.8 -62.2 -61.9 72 -99 SPO 1997 04 26 08 07 49 3.1 -9 672.40 -61.8 -62.2 -61.9 73 -99 SPO 1997 04 26 08 08 49 3.3 -9 672.40 -61.8 -62.1 -61.9 73 -99 SPO 1997 04 26 08 09 48 3.3 -9 672.40 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 08 10 48 3.4 -9 672.40 -61.8 -62.1 -61.9 72 -99 SPO 1997 04 26 08 11 48 3.1 -9 672.30 -61.8 -62.1 -61.9 71 -99 SPO 1997 04 26 08 12 49 3.2 -9 672.30 -61.8 -62.1 -61.9 71 -99 SPO 1997 04 26 08 13 49 3.2 -9 672.30 -61.8 -62.1 -61.9 71 -99 SPO 1997 04 26 08 14 49 3.0 -9 672.30 -61.8 -62.0 -61.9 71 -99 SPO 1997 04 26 08 15 49 3.0 -9 672.30 -61.7 -62.0 -61.9 70 -99 SPO 1997 04 26 08 16 49 3.3 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 17 47 3.3 -9 672.30 -61.7 -62.0 -61.8 71 -99 SPO 1997 04 26 08 18 46 3.4 -9 672.30 -61.7 -62.0 -61.8 71 -99 SPO 1997 04 26 08 19 46 3.2 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 20 47 3.5 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 21 45 3.3 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 22 45 3.3 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 23 44 3.3 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 24 46 3.2 -9 672.30 -61.7 -62.0 -61.8 70 -99 SPO 1997 04 26 08 25 46 3.2 -9 672.30 -61.7 -61.9 -61.8 70 -99 SPO 1997 04 26 08 26 46 2.8 -9 672.30 -61.6 -61.9 -61.7 70 -99 SPO 1997 04 26 08 27 48 2.9 -9 672.30 -61.6 -61.9 -61.7 70 -99 SPO 1997 04 26 08 28 47 3.0 -9 672.30 -61.6 -61.9 -61.7 70 -99 SPO 1997 04 26 08 29 47 3.1 -9 672.30 -61.6 -61.8 -61.7 70 -99 SPO 1997 04 26 08 30 45 3.0 -9 672.30 -61.6 -61.8 -61.7 71 -99 SPO 1997 04 26 08 31 43 3.2 -9 672.30 -61.5 -61.7 -61.7 70 -99 SPO 1997 04 26 08 32 44 3.2 -9 672.30 -61.5 -61.6 -61.6 69 -99 SPO 1997 04 26 08 33 43 3.1 -9 672.30 -61.5 -61.6 -61.6 69 -99 SPO 1997 04 26 08 34 46 3.0 -9 672.30 -61.4 -61.6 -61.6 68 -99 SPO 1997 04 26 08 35 43 3.1 -9 672.30 -61.4 -61.7 -61.6 68 -99 SPO 1997 04 26 08 36 44 3.2 -9 672.30 -61.4 -61.7 -61.6 68 -99 SPO 1997 04 26 08 37 43 3.4 -9 672.30 -61.4 -61.6 -61.5 69 -99 SPO 1997 04 26 08 38 41 3.3 -9 672.30 -61.3 -61.6 -61.5 70 -99 SPO 1997 04 26 08 39 41 3.1 -9 672.30 -61.3 -61.6 -61.5 71 -99 SPO 1997 04 26 08 40 43 3.6 -9 672.30 -61.3 -61.6 -61.5 71 -99 SPO 1997 04 26 08 41 41 3.4 -9 672.30 -61.3 -61.6 -61.4 72 -99 SPO 1997 04 26 08 42 41 3.4 -9 672.30 -61.3 -61.6 -61.4 72 -99 SPO 1997 04 26 08 43 41 3.5 -9 672.30 -61.3 -61.5 -61.4 72 -99 SPO 1997 04 26 08 44 40 3.6 -9 672.30 -61.2 -61.5 -61.4 70 -99 SPO 1997 04 26 08 45 41 3.4 -9 672.30 -61.2 -61.5 -61.4 70 -99 SPO 1997 04 26 08 46 42 3.3 -9 672.20 -61.2 -61.5 -61.4 70 -99 SPO 1997 04 26 08 47 41 3.5 -9 672.20 -61.2 -61.4 -61.4 70 -99 SPO 1997 04 26 08 48 42 3.4 -9 672.20 -61.2 -61.4 -61.3 71 -99 SPO 1997 04 26 08 49 41 3.4 -9 672.20 -61.2 -61.4 -61.3 71 -99 SPO 1997 04 26 08 50 41 3.8 -9 672.20 -61.2 -61.4 -61.3 71 -99 SPO 1997 04 26 08 51 40 3.5 -9 672.30 -61.2 -61.5 -61.3 71 -99 SPO 1997 04 26 08 52 39 3.8 -9 672.30 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 08 53 38 4.0 -9 672.30 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 08 54 37 4.0 -9 672.30 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 08 55 39 3.8 -9 672.30 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 08 56 40 3.9 -9 672.30 -61.2 -61.4 -61.3 73 -99 SPO 1997 04 26 08 57 41 3.4 -9 672.30 -61.2 -61.4 -61.3 73 -99 SPO 1997 04 26 08 58 41 3.6 -9 672.30 -61.1 -61.4 -61.3 70 -99 SPO 1997 04 26 08 59 42 3.9 -9 672.30 -61.1 -61.4 -61.3 70 -99 SPO 1997 04 26 09 00 42 3.6 -9 672.30 -61.1 -61.4 -61.3 70 0 SPO 1997 04 26 09 01 43 3.4 -9 672.30 -61.1 -61.4 -61.3 70 -99 SPO 1997 04 26 09 02 42 2.9 -9 672.30 -61.2 -61.4 -61.3 73 -99 SPO 1997 04 26 09 03 41 2.9 -9 672.30 -61.2 -61.4 -61.2 73 -99 SPO 1997 04 26 09 04 42 2.5 -9 672.30 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 05 44 2.8 -9 672.30 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 06 44 3.0 -9 672.30 -61.1 -61.4 -61.2 70 -99 SPO 1997 04 26 09 07 44 3.0 -9 672.30 -61.1 -61.4 -61.2 70 -99 SPO 1997 04 26 09 08 43 3.4 -9 672.20 -61.1 -61.4 -61.2 70 -99 SPO 1997 04 26 09 09 42 3.4 -9 672.20 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 10 44 3.5 -9 672.20 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 11 44 3.5 -9 672.10 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 12 44 3.5 -9 672.10 -61.2 -61.4 -61.2 73 -99 SPO 1997 04 26 09 13 45 3.6 -9 672.10 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 14 45 3.3 -9 672.10 -61.1 -61.4 -61.2 74 -99 SPO 1997 04 26 09 15 47 3.1 -9 672.10 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 16 48 2.9 -9 672.10 -61.1 -61.4 -61.2 72 -99 SPO 1997 04 26 09 17 51 2.7 -9 672.10 -61.2 -61.4 -61.2 73 -99 SPO 1997 04 26 09 18 53 2.5 -9 672.10 -61.2 -61.4 -61.2 73 -99 SPO 1997 04 26 09 19 54 2.6 -9 672.20 -61.2 -61.4 -61.2 71 -99 SPO 1997 04 26 09 20 54 2.4 -9 672.20 -61.1 -61.4 -61.2 69 -99 SPO 1997 04 26 09 21 61 2.2 -9 672.20 -61.2 -61.4 -61.2 70 -99 SPO 1997 04 26 09 22 62 2.3 -9 672.20 -61.2 -61.4 -61.2 71 -99 SPO 1997 04 26 09 23 66 2.3 -9 672.20 -61.2 -61.5 -61.3 71 -99 SPO 1997 04 26 09 24 67 2.2 -9 672.20 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 09 25 70 2.2 -9 672.30 -61.2 -61.5 -61.3 73 -99 SPO 1997 04 26 09 26 73 2.2 -9 672.30 -61.3 -61.5 -61.3 74 -99 SPO 1997 04 26 09 27 73 2.4 -9 672.30 -61.3 -61.5 -61.3 74 -99 SPO 1997 04 26 09 28 69 2.6 -9 672.20 -61.3 -61.5 -61.3 74 -99 SPO 1997 04 26 09 29 65 2.7 -9 672.20 -61.3 -61.5 -61.3 72 -99 SPO 1997 04 26 09 30 62 2.9 -9 672.20 -61.4 -61.5 -61.3 72 -99 SPO 1997 04 26 09 31 60 2.8 -9 672.20 -61.3 -61.5 -61.4 71 -99 SPO 1997 04 26 09 32 58 3.0 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 33 58 3.2 -9 672.20 -61.4 -61.4 -61.4 72 -99 SPO 1997 04 26 09 34 56 3.1 -9 672.20 -61.3 -61.4 -61.4 71 -99 SPO 1997 04 26 09 35 53 3.2 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 36 54 3.3 -9 672.20 -61.4 -61.4 -61.4 72 -99 SPO 1997 04 26 09 37 53 3.1 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 38 53 2.9 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 39 56 2.9 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 40 57 2.8 -9 672.20 -61.4 -61.5 -61.5 72 -99 SPO 1997 04 26 09 41 59 2.5 -9 672.20 -61.4 -61.5 -61.4 72 -99 SPO 1997 04 26 09 42 60 2.7 -9 672.20 -61.5 -61.6 -61.4 72 -99 SPO 1997 04 26 09 43 58 2.9 -9 672.20 -61.5 -61.5 -61.5 72 -99 SPO 1997 04 26 09 44 58 2.8 -9 672.20 -61.5 -61.5 -61.5 72 -99 SPO 1997 04 26 09 45 57 2.6 -9 672.20 -61.5 -61.5 -61.5 73 -99 SPO 1997 04 26 09 46 56 2.5 -9 672.20 -61.5 -61.5 -61.5 73 -99 SPO 1997 04 26 09 47 61 2.5 -9 672.30 -61.5 -61.5 -61.5 73 -99 SPO 1997 04 26 09 48 63 2.4 -9 672.30 -61.5 -61.5 -61.5 72 -99 SPO 1997 04 26 09 49 64 2.4 -9 672.30 -61.5 -61.5 -61.5 72 -99 SPO 1997 04 26 09 50 64 2.2 -9 672.30 -61.5 -61.5 -61.5 72 -99 SPO 1997 04 26 09 51 64 2.2 -9 672.30 -61.5 -61.5 -61.5 70 -99 SPO 1997 04 26 09 52 66 2.0 -9 672.30 -61.5 -61.6 -61.5 70 -99 SPO 1997 04 26 09 53 63 2.0 -9 672.30 -61.6 -61.6 -61.5 70 -99 SPO 1997 04 26 09 54 63 2.2 -9 672.30 -61.6 -61.6 -61.6 70 -99 SPO 1997 04 26 09 55 61 2.5 -9 672.20 -61.6 -61.7 -61.6 69 -99 SPO 1997 04 26 09 56 61 2.6 -9 672.20 -61.6 -61.7 -61.6 69 -99 SPO 1997 04 26 09 57 61 2.5 -9 672.20 -61.6 -61.6 -61.6 70 -99 SPO 1997 04 26 09 58 62 2.5 -9 672.20 -61.7 -61.6 -61.6 71 -99 SPO 1997 04 26 09 59 61 2.5 -9 672.20 -61.7 -61.6 -61.7 71 -99 SPO 1997 04 26 10 00 58 2.5 -9 672.20 -61.7 -61.6 -61.7 71 0 SPO 1997 04 26 10 01 56 2.6 -9 672.20 -61.7 -61.6 -61.7 71 -99 SPO 1997 04 26 10 02 54 2.6 -9 672.20 -61.8 -61.6 -61.7 72 -99 SPO 1997 04 26 10 03 54 2.4 -9 672.20 -61.8 -61.6 -61.7 71 -99 SPO 1997 04 26 10 04 55 2.4 -9 672.20 -61.8 -61.6 -61.8 71 -99 SPO 1997 04 26 10 05 54 2.5 -9 672.20 -61.8 -61.6 -61.8 71 -99 SPO 1997 04 26 10 06 52 2.7 -9 672.20 -61.8 -61.6 -61.8 71 -99 SPO 1997 04 26 10 07 49 2.7 -9 672.20 -61.8 -61.6 -61.8 70 -99 SPO 1997 04 26 10 08 47 3.1 -9 672.10 -61.8 -61.6 -61.8 70 -99 SPO 1997 04 26 10 09 46 3.2 -9 672.10 -61.9 -61.7 -61.8 72 -99 SPO 1997 04 26 10 10 45 3.3 -9 672.10 -61.9 -61.7 -61.9 72 -99 SPO 1997 04 26 10 11 46 3.3 -9 672.10 -61.9 -61.7 -61.9 72 -99 SPO 1997 04 26 10 12 47 3.4 -9 672.10 -61.9 -61.7 -61.9 72 -99 SPO 1997 04 26 10 13 47 3.5 -9 672.10 -62.0 -61.7 -61.9 73 -99 SPO 1997 04 26 10 14 47 3.5 -9 672.10 -62.0 -61.7 -62.0 72 -99 SPO 1997 04 26 10 15 47 3.7 -9 672.00 -62.0 -61.7 -62.0 70 -99 SPO 1997 04 26 10 16 47 3.8 -9 672.00 -62.1 -61.7 -62.0 71 -99 SPO 1997 04 26 10 17 47 3.8 -9 672.00 -62.1 -61.7 -62.0 70 -99 SPO 1997 04 26 10 18 47 3.7 -9 672.00 -62.0 -61.6 -62.1 69 -99 SPO 1997 04 26 10 19 47 3.6 -9 672.00 -62.0 -61.6 -62.1 69 -99 SPO 1997 04 26 10 20 48 3.5 -9 672.10 -62.1 -61.6 -62.1 70 -99 SPO 1997 04 26 10 21 49 3.4 -9 672.10 -62.1 -61.7 -62.1 70 -99 SPO 1997 04 26 10 22 51 3.3 -9 672.10 -62.1 -61.7 -62.1 70 -99 SPO 1997 04 26 10 23 52 3.1 -9 672.10 -62.1 -61.7 -62.1 70 -99 SPO 1997 04 26 10 24 52 3.1 -9 672.10 -62.1 -61.8 -62.2 70 -99 SPO 1997 04 26 10 25 52 3.1 -9 672.10 -62.2 -61.8 -62.2 71 -99 SPO 1997 04 26 10 26 52 3.1 -9 672.10 -62.2 -61.8 -62.2 70 -99 SPO 1997 04 26 10 27 53 3.1 -9 672.10 -62.2 -61.9 -62.2 70 -99 SPO 1997 04 26 10 28 53 3.1 -9 672.10 -62.2 -61.9 -62.2 70 -99 SPO 1997 04 26 10 29 53 3.1 -9 672.00 -62.3 -61.9 -62.2 71 -99 SPO 1997 04 26 10 30 53 3.2 -9 672.00 -62.3 -61.9 -62.3 70 -99 SPO 1997 04 26 10 31 52 3.2 -9 672.00 -62.4 -61.9 -62.3 72 -99 SPO 1997 04 26 10 32 52 3.2 -9 672.00 -62.3 -61.9 -62.3 71 -99 SPO 1997 04 26 10 33 51 3.1 -9 672.00 -62.3 -61.9 -62.3 71 -99 SPO 1997 04 26 10 34 51 3.0 -9 672.10 -62.3 -61.9 -62.3 71 -99 SPO 1997 04 26 10 35 51 2.9 -9 672.10 -62.3 -61.9 -62.3 71 -99 SPO 1997 04 26 10 36 53 2.9 -9 672.10 -62.3 -61.9 -62.3 71 -99 SPO 1997 04 26 10 37 53 2.9 -9 672.10 -62.3 -61.9 -62.3 70 -99 SPO 1997 04 26 10 38 53 2.8 -9 672.10 -62.4 -61.9 -62.4 69 -99 SPO 1997 04 26 10 39 56 2.6 -9 672.20 -62.4 -62.0 -62.4 68 -99 SPO 1997 04 26 10 40 57 2.5 -9 672.20 -62.4 -62.0 -62.4 68 -99 SPO 1997 04 26 10 41 55 2.5 -9 672.20 -62.4 -62.1 -62.4 69 -99 SPO 1997 04 26 10 42 56 2.6 -9 672.20 -62.4 -62.1 -62.4 69 -99 SPO 1997 04 26 10 43 52 2.6 -9 672.20 -62.4 -62.0 -62.4 71 -99 SPO 1997 04 26 10 44 54 2.7 -9 672.20 -62.4 -62.1 -62.5 71 -99 SPO 1997 04 26 10 45 54 2.7 -9 672.20 -62.5 -62.0 -62.5 72 -99 SPO 1997 04 26 10 46 53 2.7 -9 672.20 -62.5 -62.1 -62.5 73 -99 SPO 1997 04 26 10 47 54 2.7 -9 672.20 -62.4 -62.0 -62.4 72 -99 SPO 1997 04 26 10 48 55 2.7 -9 672.20 -62.4 -62.0 -62.4 71 -99 SPO 1997 04 26 10 49 55 2.6 -9 672.20 -62.4 -62.0 -62.4 71 -99 SPO 1997 04 26 10 50 55 2.6 -9 672.20 -62.5 -62.0 -62.5 70 -99 SPO 1997 04 26 10 51 54 2.7 -9 672.20 -62.5 -62.0 -62.5 69 -99 SPO 1997 04 26 10 52 52 2.9 -9 672.10 -62.5 -62.0 -62.5 69 -99 SPO 1997 04 26 10 53 52 3.3 -9 672.10 -62.5 -62.0 -62.5 69 -99 SPO 1997 04 26 10 54 51 3.2 -9 672.10 -62.4 -62.0 -62.5 68 -99 SPO 1997 04 26 10 55 51 3.3 -9 672.10 -62.5 -62.0 -62.6 70 -99 SPO 1997 04 26 10 56 50 3.2 -9 672.10 -62.5 -62.1 -62.6 70 -99 SPO 1997 04 26 10 57 50 3.1 -9 672.10 -62.5 -62.1 -62.6 70 -99 SPO 1997 04 26 10 58 50 3.1 -9 672.10 -62.5 -62.1 -62.6 70 -99 SPO 1997 04 26 10 59 49 3.2 -9 672.10 -62.5 -62.0 -62.6 70 -99 SPO 1997 04 26 11 00 50 3.3 -9 672.10 -62.5 -62.0 -62.6 69 0 SPO 1997 04 26 11 01 50 3.2 -9 672.10 -62.5 -62.0 -62.6 69 -99 SPO 1997 04 26 11 02 52 3.1 -9 672.20 -62.4 -62.0 -62.5 67 -99 SPO 1997 04 26 11 03 54 2.9 -9 672.20 -62.4 -62.0 -62.5 67 -99 SPO 1997 04 26 11 04 57 2.8 -9 672.20 -62.5 -62.1 -62.5 68 -99 SPO 1997 04 26 11 05 59 2.6 -9 672.20 -62.5 -62.1 -62.5 68 -99 SPO 1997 04 26 11 06 60 2.5 -9 672.20 -62.5 -62.1 -62.6 68 -99 SPO 1997 04 26 11 07 62 2.2 -9 672.20 -62.5 -62.1 -62.6 68 -99 SPO 1997 04 26 11 08 62 2.2 -9 672.20 -62.5 -62.1 -62.6 68 -99 SPO 1997 04 26 11 09 64 2.2 -9 672.30 -62.6 -62.2 -62.6 69 -99 SPO 1997 04 26 11 10 62 2.2 -9 672.20 -62.6 -62.2 -62.6 69 -99 SPO 1997 04 26 11 11 62 2.4 -9 672.20 -62.6 -62.2 -62.6 69 -99 SPO 1997 04 26 11 12 61 2.3 -9 672.20 -62.7 -62.2 -62.6 70 -99 SPO 1997 04 26 11 13 64 2.2 -9 672.20 -62.7 -62.3 -62.6 70 -99 SPO 1997 04 26 11 14 66 2.2 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 15 68 2.3 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 16 69 2.2 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 17 71 2.3 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 18 73 2.3 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 19 72 2.3 -9 672.30 -62.8 -62.3 -62.7 71 -99 SPO 1997 04 26 11 20 71 2.5 -9 672.30 -62.9 -62.3 -62.7 72 -99 SPO 1997 04 26 11 21 68 2.6 -9 672.30 -62.9 -62.2 -62.8 72 -99 SPO 1997 04 26 11 22 64 2.8 -9 672.30 -62.9 -62.2 -62.8 72 -99 SPO 1997 04 26 11 23 64 2.9 -9 672.30 -62.9 -62.2 -62.8 71 -99 SPO 1997 04 26 11 24 64 2.9 -9 672.30 -62.9 -62.2 -62.8 69 -99 SPO 1997 04 26 11 25 65 2.8 -9 672.40 -62.9 -62.2 -62.8 68 -99 SPO 1997 04 26 11 26 67 2.7 -9 672.40 -62.9 -62.3 -62.8 68 -99 SPO 1997 04 26 11 27 69 2.7 -9 672.40 -62.9 -62.3 -62.8 68 -99 SPO 1997 04 26 11 28 72 2.7 -9 672.40 -62.9 -62.3 -62.9 68 -99 SPO 1997 04 26 11 29 74 2.6 -9 672.40 -63.0 -62.3 -62.9 70 -99 SPO 1997 04 26 11 30 76 2.7 -9 672.40 -63.0 -62.4 -62.9 70 -99 SPO 1997 04 26 11 31 76 2.7 -9 672.40 -62.9 -62.4 -62.9 69 -99 SPO 1997 04 26 11 32 75 2.7 -9 672.40 -63.0 -62.4 -62.9 72 -99 SPO 1997 04 26 11 33 71 2.8 -9 672.40 -63.0 -62.3 -62.9 72 -99 SPO 1997 04 26 11 34 69 2.8 -9 672.40 -63.0 -62.3 -63.0 72 -99 SPO 1997 04 26 11 35 69 2.9 -9 672.30 -63.0 -62.3 -63.0 70 -99 SPO 1997 04 26 11 36 68 2.9 -9 672.30 -63.0 -62.3 -63.0 69 -99 SPO 1997 04 26 11 37 67 3.0 -9 672.30 -63.0 -62.2 -63.0 68 -99 SPO 1997 04 26 11 38 67 3.1 -9 672.30 -63.0 -62.3 -63.0 68 -99 SPO 1997 04 26 11 39 67 3.1 -9 672.30 -63.1 -62.3 -63.0 68 -99 SPO 1997 04 26 11 40 67 3.2 -9 672.30 -63.1 -62.3 -63.0 68 -99 SPO 1997 04 26 11 41 68 3.3 -9 672.30 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 42 68 3.3 -9 672.30 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 43 67 3.3 -9 672.30 -63.1 -62.4 -63.1 69 -99 SPO 1997 04 26 11 44 66 3.3 -9 672.30 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 45 66 3.3 -9 672.30 -63.1 -62.3 -63.1 70 -99 SPO 1997 04 26 11 46 65 3.2 -9 672.30 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 47 64 3.3 -9 672.40 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 48 63 3.3 -9 672.40 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 49 62 3.4 -9 672.40 -63.1 -62.3 -63.1 69 -99 SPO 1997 04 26 11 50 62 3.3 -9 672.40 -63.1 -62.3 -63.1 68 -99 SPO 1997 04 26 11 51 61 3.2 -9 672.40 -63.1 -62.2 -63.1 68 -99 SPO 1997 04 26 11 52 62 3.1 -9 672.40 -63.1 -62.2 -63.1 69 -99 SPO 1997 04 26 11 53 62 3.1 -9 672.40 -63.1 -62.2 -63.1 69 -99 SPO 1997 04 26 11 54 63 3.1 -9 672.40 -63.1 -62.2 -63.1 69 -99 SPO 1997 04 26 11 55 62 3.1 -9 672.40 -63.1 -62.2 -63.2 69 -99 SPO 1997 04 26 11 56 59 3.2 -9 672.40 -63.1 -62.2 -63.2 69 -99 SPO 1997 04 26 11 57 56 3.4 -9 672.30 -63.1 -62.2 -63.1 70 -99 SPO 1997 04 26 11 58 55 3.5 -9 672.30 -63.1 -62.2 -63.1 70 -99 SPO 1997 04 26 11 59 55 3.5 -9 672.30 -63.0 -62.2 -63.2 68 -99 SPO 1997 04 26 12 00 55 3.4 -9 672.30 -63.1 -62.2 -63.2 69 0 SPO 1997 04 26 12 01 55 3.4 -9 672.30 -63.1 -62.2 -63.2 68 -99 SPO 1997 04 26 12 02 56 3.4 -9 672.30 -63.1 -62.2 -63.2 68 -99 SPO 1997 04 26 12 03 56 3.4 -9 672.30 -63.1 -62.2 -63.2 68 -99 SPO 1997 04 26 12 04 55 3.4 -9 672.30 -63.1 -62.2 -63.2 68 -99 SPO 1997 04 26 12 05 53 3.5 -9 672.20 -63.1 -62.2 -63.2 69 -99 SPO 1997 04 26 12 06 53 3.7 -9 672.20 -63.1 -62.1 -63.2 69 -99 SPO 1997 04 26 12 07 53 3.5 -9 672.20 -63.1 -62.1 -63.2 69 -99 SPO 1997 04 26 12 08 54 3.4 -9 672.20 -63.1 -62.1 -63.2 69 -99 SPO 1997 04 26 12 09 56 3.4 -9 672.30 -63.2 -62.1 -63.2 70 -99 SPO 1997 04 26 12 10 55 3.3 -9 672.30 -63.2 -62.1 -63.2 69 -99 SPO 1997 04 26 12 11 55 3.4 -9 672.30 -63.2 -62.1 -63.2 66 -99 SPO 1997 04 26 12 12 54 3.4 -9 672.30 -63.2 -62.2 -63.2 66 -99 SPO 1997 04 26 12 13 54 3.4 -9 672.20 -63.2 -62.2 -63.3 66 -99 SPO 1997 04 26 12 14 53 3.5 -9 672.20 -63.2 -62.2 -63.3 66 -99 SPO 1997 04 26 12 15 51 3.6 -9 672.20 -63.3 -62.2 -63.3 67 -99 SPO 1997 04 26 12 16 50 3.8 -9 672.20 -63.3 -62.2 -63.3 70 -99 SPO 1997 04 26 12 17 49 3.9 -9 672.10 -63.3 -62.1 -63.3 70 -99 SPO 1997 04 26 12 18 50 3.8 -9 672.10 -63.3 -62.1 -63.3 70 -99 SPO 1997 04 26 12 19 51 3.8 -9 672.10 -63.3 -62.1 -63.4 67 -99 SPO 1997 04 26 12 20 51 3.7 -9 672.20 -63.3 -62.2 -63.4 67 -99 SPO 1997 04 26 12 21 52 3.6 -9 672.20 -63.3 -62.2 -63.4 67 -99 SPO 1997 04 26 12 22 54 3.5 -9 672.20 -63.4 -62.2 -63.4 67 -99 SPO 1997 04 26 12 23 56 3.4 -9 672.20 -63.4 -62.1 -63.4 67 -99 SPO 1997 04 26 12 24 58 3.4 -9 672.20 -63.4 -62.2 -63.4 67 -99 SPO 1997 04 26 12 25 60 3.3 -9 672.20 -63.4 -62.2 -63.4 66 -99 SPO 1997 04 26 12 26 60 3.2 -9 672.20 -63.4 -62.3 -63.4 66 -99 SPO 1997 04 26 12 27 60 3.1 -9 672.20 -63.5 -62.4 -63.5 67 -99 SPO 1997 04 26 12 28 62 3.0 -9 672.20 -63.5 -62.4 -63.5 67 -99 SPO 1997 04 26 12 29 64 3.1 -9 672.20 -63.5 -62.4 -63.5 67 -99 SPO 1997 04 26 12 30 63 3.2 -9 672.20 -63.6 -62.4 -63.5 68 -99 SPO 1997 04 26 12 31 61 3.3 -9 672.20 -63.6 -62.4 -63.6 69 -99 SPO 1997 04 26 12 32 59 3.5 -9 672.20 -63.6 -62.4 -63.6 68 -99 SPO 1997 04 26 12 33 58 3.6 -9 672.20 -63.6 -62.4 -63.6 66 -99 SPO 1997 04 26 12 34 58 3.8 -9 672.20 -63.7 -62.3 -63.7 67 -99 SPO 1997 04 26 12 35 57 3.8 -9 672.20 -63.7 -62.2 -63.7 66 -99 SPO 1997 04 26 12 36 58 3.9 -9 672.20 -63.7 -62.2 -63.7 66 -99 SPO 1997 04 26 12 37 58 3.9 -9 672.20 -63.7 -62.1 -63.7 66 -99 SPO 1997 04 26 12 38 58 4.0 -9 672.20 -63.8 -62.1 -63.8 66 -99 SPO 1997 04 26 12 39 57 4.0 -9 672.20 -63.8 -62.1 -63.8 66 -99 SPO 1997 04 26 12 40 56 4.1 -9 672.10 -63.9 -62.2 -63.8 67 -99 SPO 1997 04 26 12 41 55 4.2 -9 672.10 -63.9 -62.1 -63.9 67 -99 SPO 1997 04 26 12 42 54 4.2 -9 672.10 -63.9 -62.2 -63.9 67 -99 SPO 1997 04 26 12 43 54 4.1 -9 672.10 -64.0 -62.2 -63.9 68 -99 SPO 1997 04 26 12 44 56 4.1 -9 672.10 -64.0 -62.2 -64.0 67 -99 SPO 1997 04 26 12 45 57 3.9 -9 672.10 -64.0 -62.2 -64.0 65 -99 SPO 1997 04 26 12 46 57 3.7 -9 672.20 -64.0 -62.2 -64.0 64 -99 SPO 1997 04 26 12 47 57 3.5 -9 672.20 -64.0 -62.3 -64.0 63 -99 SPO 1997 04 26 12 48 56 3.5 -9 672.20 -64.1 -62.4 -64.0 64 -99 SPO 1997 04 26 12 49 54 3.6 -9 672.10 -64.1 -62.4 -64.1 64 -99 SPO 1997 04 26 12 50 51 3.6 -9 672.10 -64.1 -62.4 -64.1 65 -99 SPO 1997 04 26 12 51 50 3.7 -9 672.10 -64.1 -62.3 -64.1 65 -99 SPO 1997 04 26 12 52 50 3.7 -9 672.10 -64.2 -62.3 -64.1 66 -99 SPO 1997 04 26 12 53 50 3.5 -9 672.20 -64.2 -62.4 -64.2 66 -99 SPO 1997 04 26 12 54 51 3.4 -9 672.20 -64.2 -62.4 -64.2 66 -99 SPO 1997 04 26 12 55 49 3.5 -9 672.20 -64.2 -62.5 -64.2 65 -99 SPO 1997 04 26 12 56 47 3.5 -9 672.20 -64.3 -62.5 -64.2 66 -99 SPO 1997 04 26 12 57 47 3.5 -9 672.20 -64.3 -62.5 -64.3 66 -99 SPO 1997 04 26 12 58 46 3.6 -9 672.20 -64.3 -62.6 -64.3 66 -99 SPO 1997 04 26 12 59 46 3.6 -9 672.20 -64.4 -62.6 -64.4 67 -99 SPO 1997 04 26 13 00 46 3.6 -9 672.10 -64.4 -62.6 -64.4 66 0 SPO 1997 04 26 13 01 46 3.8 -9 672.20 -64.5 -62.6 -64.4 67 -99 SPO 1997 04 26 13 02 45 3.9 -9 672.10 -64.5 -62.6 -64.4 67 -99 SPO 1997 04 26 13 03 44 3.9 -9 672.10 -64.5 -62.6 -64.5 67 -99 SPO 1997 04 26 13 04 45 3.9 -9 672.10 -64.5 -62.6 -64.5 65 -99 SPO 1997 04 26 13 05 46 3.8 -9 672.10 -64.6 -62.6 -64.5 66 -99 SPO 1997 04 26 13 06 48 3.6 -9 672.10 -64.6 -62.6 -64.6 66 -99 SPO 1997 04 26 13 07 50 3.5 -9 672.10 -64.6 -62.6 -64.6 65 -99 SPO 1997 04 26 13 08 51 3.4 -9 672.20 -64.6 -62.6 -64.6 64 -99 SPO 1997 04 26 13 09 51 3.5 -9 672.20 -64.7 -62.6 -64.6 65 -99 SPO 1997 04 26 13 10 50 3.4 -9 672.20 -64.7 -62.6 -64.7 65 -99 SPO 1997 04 26 13 11 48 3.4 -9 672.20 -64.7 -62.6 -64.7 65 -99 SPO 1997 04 26 13 12 48 3.3 -9 672.20 -64.8 -62.6 -64.7 65 -99 SPO 1997 04 26 13 13 49 3.3 -9 672.20 -64.8 -62.6 -64.8 66 -99 SPO 1997 04 26 13 14 49 3.3 -9 672.20 -64.8 -62.6 -64.8 66 -99 SPO 1997 04 26 13 15 49 3.4 -9 672.20 -64.9 -62.6 -64.8 67 -99 SPO 1997 04 26 13 16 48 3.4 -9 672.10 -64.9 -62.6 -64.9 67 -99 SPO 1997 04 26 13 17 46 3.4 -9 672.10 -65.0 -62.6 -64.9 67 -99 SPO 1997 04 26 13 18 45 3.6 -9 672.10 -65.0 -62.6 -64.9 64 -99 SPO 1997 04 26 13 19 44 3.6 -9 672.10 -65.0 -62.5 -65.0 63 -99 SPO 1997 04 26 13 20 44 3.8 -9 672.00 -65.0 -62.5 -65.0 63 -99 SPO 1997 04 26 13 21 45 3.8 -9 672.00 -65.1 -62.5 -65.0 64 -99 SPO 1997 04 26 13 22 47 3.7 -9 672.10 -65.1 -62.5 -65.0 64 -99 SPO 1997 04 26 13 23 48 3.6 -9 672.10 -65.1 -62.5 -65.1 63 -99 SPO 1997 04 26 13 24 49 3.6 -9 672.10 -65.2 -62.5 -65.1 64 -99 SPO 1997 04 26 13 25 50 3.6 -9 672.10 -65.2 -62.5 -65.1 64 -99 SPO 1997 04 26 13 26 51 3.6 -9 672.10 -65.3 -62.6 -65.2 65 -99 SPO 1997 04 26 13 27 53 3.6 -9 672.10 -65.3 -62.6 -65.2 65 -99 SPO 1997 04 26 13 28 54 3.6 -9 672.10 -65.4 -62.6 -65.3 66 -99 SPO 1997 04 26 13 29 55 3.6 -9 672.10 -65.4 -62.6 -65.3 64 -99 SPO 1997 04 26 13 30 55 3.7 -9 672.10 -65.5 -62.6 -65.4 64 -99 SPO 1997 04 26 13 31 56 3.7 -9 672.10 -65.5 -62.5 -65.4 63 -99 SPO 1997 04 26 13 32 56 3.7 -9 672.10 -65.6 -62.5 -65.5 64 -99 SPO 1997 04 26 13 33 57 3.8 -9 672.10 -65.6 -62.5 -65.5 63 -99 SPO 1997 04 26 13 34 58 3.7 -9 672.10 -65.6 -62.5 -65.5 63 -99 SPO 1997 04 26 13 35 60 3.8 -9 672.20 -65.7 -62.4 -65.6 62 -99 SPO 1997 04 26 13 36 60 3.7 -9 672.20 -65.8 -62.4 -65.6 63 -99 SPO 1997 04 26 13 37 60 3.7 -9 672.20 -65.8 -62.4 -65.6 63 -99 SPO 1997 04 26 13 38 58 3.8 -9 672.20 -65.8 -62.3 -65.7 62 -99 SPO 1997 04 26 13 39 58 3.8 -9 672.20 -65.9 -62.3 -65.7 62 -99 SPO 1997 04 26 13 40 57 3.9 -9 672.10 -65.9 -62.3 -65.8 62 -99 SPO 1997 04 26 13 41 58 3.9 -9 672.10 -66.0 -62.3 -65.8 63 -99 SPO 1997 04 26 13 42 58 3.9 -9 672.10 -66.0 -62.4 -65.9 63 -99 SPO 1997 04 26 13 43 59 3.8 -9 672.20 -66.1 -62.4 -65.9 63 -99 SPO 1997 04 26 13 44 60 3.5 -9 672.20 -66.2 -62.4 -66.0 64 -99 SPO 1997 04 26 13 45 61 3.6 -9 672.20 -66.2 -62.4 -66.0 62 -99 SPO 1997 04 26 13 46 62 3.7 -9 672.20 -66.3 -62.5 -66.0 62 -99 SPO 1997 04 26 13 47 62 3.7 -9 672.20 -66.4 -62.5 -66.1 62 -99 SPO 1997 04 26 13 48 62 3.7 -9 672.20 -66.4 -62.5 -66.2 62 -99 SPO 1997 04 26 13 49 64 3.7 -9 672.20 -66.6 -62.4 -66.2 64 -99 SPO 1997 04 26 13 50 66 3.6 -9 672.20 -66.7 -62.4 -66.3 65 -99 SPO 1997 04 26 13 51 68 3.6 -9 672.20 -66.8 -62.4 -66.4 65 -99 SPO 1997 04 26 13 52 67 3.7 -9 672.20 -66.9 -62.4 -66.4 64 -99 SPO 1997 04 26 13 53 66 3.8 -9 672.20 -66.9 -62.4 -66.5 63 -99 SPO 1997 04 26 13 54 65 3.8 -9 672.20 -67.0 -62.4 -66.6 63 -99 SPO 1997 04 26 13 55 65 3.8 -9 672.20 -67.0 -62.5 -66.6 62 -99 SPO 1997 04 26 13 56 65 3.8 -9 672.20 -67.1 -62.5 -66.7 61 -99 SPO 1997 04 26 13 57 65 3.7 -9 672.20 -67.2 -62.5 -66.8 61 -99 SPO 1997 04 26 13 58 62 3.8 -9 672.20 -67.2 -62.5 -66.8 61 -99 SPO 1997 04 26 13 59 60 3.8 -9 672.20 -67.2 -62.5 -66.9 61 -99 SPO 1997 04 26 14 00 58 3.9 -9 672.20 -67.2 -62.4 -66.9 60 0 SPO 1997 04 26 14 01 58 3.9 -9 672.20 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 02 59 3.8 -9 672.20 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 03 60 3.6 -9 672.20 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 04 61 3.7 -9 672.10 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 05 60 3.9 -9 672.10 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 06 60 4.0 -9 672.10 -67.2 -62.4 -67.0 60 -99 SPO 1997 04 26 14 07 58 4.1 -9 672.00 -67.2 -62.4 -67.1 58 -99 SPO 1997 04 26 14 08 59 4.1 -9 672.00 -67.3 -62.4 -67.1 59 -99 SPO 1997 04 26 14 09 60 4.0 -9 672.10 -67.3 -62.4 -67.1 59 -99 SPO 1997 04 26 14 10 62 3.9 -9 672.10 -67.3 -62.4 -67.2 59 -99 SPO 1997 04 26 14 11 63 3.9 -9 672.10 -67.3 -62.4 -67.2 59 -99 SPO 1997 04 26 14 12 63 3.9 -9 672.00 -67.3 -62.4 -67.2 59 -99 SPO 1997 04 26 14 13 61 4.0 -9 672.00 -67.4 -62.5 -67.2 61 -99 SPO 1997 04 26 14 14 58 4.2 -9 672.00 -67.4 -62.5 -67.3 59 -99 SPO 1997 04 26 14 15 56 4.3 -9 671.90 -67.3 -62.4 -67.2 60 -99 SPO 1997 04 26 14 16 54 4.4 -9 672.00 -67.2 -62.3 -67.2 60 -99 SPO 1997 04 26 14 17 54 4.5 -9 672.00 -67.1 -62.3 -67.1 59 -99 SPO 1997 04 26 14 18 54 4.4 -9 672.00 -67.0 -62.2 -67.1 58 -99 SPO 1997 04 26 14 19 54 4.5 -9 671.90 -67.0 -62.2 -67.1 58 -99 SPO 1997 04 26 14 20 53 4.6 -9 671.90 -67.0 -62.1 -67.0 58 -99 SPO 1997 04 26 14 21 52 4.7 -9 671.90 -66.9 -62.1 -67.0 57 -99 SPO 1997 04 26 14 22 51 4.8 -9 671.90 -66.8 -62.2 -66.9 57 -99 SPO 1997 04 26 14 23 50 4.8 -9 671.90 -66.7 -62.2 -66.8 57 -99 SPO 1997 04 26 14 24 49 4.8 -9 671.90 -66.6 -62.2 -66.8 57 -99 SPO 1997 04 26 14 25 48 4.7 -9 671.90 -66.5 -62.2 -66.7 58 -99 SPO 1997 04 26 14 26 48 4.6 -9 671.90 -66.4 -62.1 -66.6 58 -99 SPO 1997 04 26 14 27 47 4.6 -9 671.90 -66.3 -62.1 -66.6 57 -99 SPO 1997 04 26 14 28 47 4.5 -9 671.90 -66.2 -62.0 -66.5 57 -99 SPO 1997 04 26 14 29 47 4.4 -9 671.90 -66.2 -62.0 -66.5 57 -99 SPO 1997 04 26 14 30 47 4.6 -9 671.90 -66.1 -61.9 -66.4 57 -99 SPO 1997 04 26 14 31 47 4.4 -9 671.90 -66.0 -62.0 -66.3 57 -99 SPO 1997 04 26 14 32 48 4.6 -9 671.90 -66.0 -61.9 -66.3 57 -99 SPO 1997 04 26 14 33 48 4.5 -9 671.90 -65.9 -61.9 -66.2 57 -99 SPO 1997 04 26 14 34 49 4.5 -9 671.90 -65.8 -62.0 -66.2 57 -99 SPO 1997 04 26 14 35 49 4.4 -9 671.90 -65.8 -62.0 -66.1 57 -99 SPO 1997 04 26 14 36 49 4.4 -9 671.90 -65.7 -62.0 -66.1 57 -99 SPO 1997 04 26 14 37 48 4.4 -9 671.90 -65.7 -62.0 -66.0 58 -99 SPO 1997 04 26 14 38 47 4.5 -9 671.90 -65.6 -62.1 -66.0 59 -99 SPO 1997 04 26 14 39 47 4.5 -9 671.90 -65.6 -62.0 -65.9 60 -99 SPO 1997 04 26 14 40 47 4.5 -9 671.90 -65.5 -62.0 -65.9 59 -99 SPO 1997 04 26 14 41 48 4.3 -9 671.90 -65.5 -62.1 -65.8 59 -99 SPO 1997 04 26 14 42 50 4.3 -9 671.90 -65.4 -62.1 -65.8 58 -99 SPO 1997 04 26 14 43 50 4.1 -9 671.90 -65.3 -62.2 -65.7 58 -99 SPO 1997 04 26 14 44 51 4.0 -9 671.80 -65.3 -62.4 -65.6 58 -99 SPO 1997 04 26 14 45 51 3.8 -9 671.90 -65.2 -62.4 -65.6 58 -99 SPO 1997 04 26 14 46 50 3.5 -9 671.90 -65.1 -62.5 -65.5 59 -99 SPO 1997 04 26 14 47 53 3.5 -9 671.90 -65.1 -62.6 -65.5 60 -99 SPO 1997 04 26 14 48 55 3.4 -9 672.00 -65.0 -62.6 -65.4 59 -99 SPO 1997 04 26 14 49 57 3.5 -9 672.00 -65.0 -62.7 -65.4 59 -99 SPO 1997 04 26 14 50 57 3.4 -9 672.00 -65.0 -62.8 -65.3 59 -99 SPO 1997 04 26 14 51 56 3.5 -9 671.90 -65.0 -62.8 -65.3 60 -99 SPO 1997 04 26 14 52 53 3.7 -9 671.90 -65.0 -62.8 -65.3 60 -99 SPO 1997 04 26 14 53 52 3.6 -9 671.90 -65.0 -62.9 -65.3 61 -99 SPO 1997 04 26 14 54 53 3.5 -9 671.90 -64.9 -63.0 -65.2 60 -99 SPO 1997 04 26 14 55 57 3.4 -9 672.00 -64.9 -63.0 -65.2 60 -99 SPO 1997 04 26 14 56 61 3.1 -9 672.00 -64.9 -63.1 -65.2 62 -99 SPO 1997 04 26 14 57 62 3.1 -9 672.00 -64.9 -63.2 -65.2 62 -99 SPO 1997 04 26 14 58 59 3.3 -9 672.00 -64.9 -63.0 -65.2 62 -99 SPO 1997 04 26 14 59 55 3.5 -9 672.00 -65.0 -62.9 -65.2 63 -99 SPO 1997 04 26 15 00 51 3.5 -9 672.00 -64.9 -62.9 -65.2 63 0 SPO 1997 04 26 15 01 50 3.6 -9 672.00 -64.9 -62.8 -65.1 63 -99 SPO 1997 04 26 15 02 49 3.5 -9 672.00 -64.9 -62.8 -65.1 63 -99 SPO 1997 04 26 15 03 51 3.4 -9 672.00 -64.9 -62.8 -65.1 63 -99 SPO 1997 04 26 15 04 53 3.3 -9 672.00 -64.9 -62.9 -65.0 62 -99 SPO 1997 04 26 15 05 54 3.3 -9 672.00 -64.8 -63.0 -65.0 62 -99 SPO 1997 04 26 15 06 53 3.2 -9 672.00 -64.9 -63.0 -65.0 62 -99 SPO 1997 04 26 15 07 51 3.3 -9 672.00 -64.9 -63.1 -65.0 63 -99 SPO 1997 04 26 15 08 49 3.4 -9 671.90 -64.8 -63.0 -65.0 63 -99 SPO 1997 04 26 15 09 49 3.4 -9 671.90 -64.8 -62.9 -65.0 63 -99 SPO 1997 04 26 15 10 49 3.4 -9 671.90 -64.8 -62.9 -65.0 63 -99 SPO 1997 04 26 15 11 49 3.4 -9 671.90 -64.8 -63.0 -64.9 65 -99 SPO 1997 04 26 15 12 48 3.6 -9 671.90 -64.8 -63.0 -64.9 66 -99 SPO 1997 04 26 15 13 45 3.7 -9 671.90 -64.7 -62.9 -64.9 65 -99 SPO 1997 04 26 15 14 42 4.0 -9 671.90 -64.7 -62.8 -64.9 65 -99 SPO 1997 04 26 15 15 40 3.9 -9 671.80 -64.6 -62.8 -64.8 64 -99 SPO 1997 04 26 15 16 39 4.0 -9 671.80 -64.5 -62.6 -64.7 63 -99 SPO 1997 04 26 15 17 40 3.9 -9 671.90 -64.4 -62.6 -64.6 63 -99 SPO 1997 04 26 15 18 41 3.8 -9 671.90 -64.4 -62.6 -64.6 63 -99 SPO 1997 04 26 15 19 42 3.7 -9 671.90 -64.3 -62.6 -64.5 62 -99 SPO 1997 04 26 15 20 45 3.3 -9 671.90 -64.2 -62.7 -64.5 61 -99 SPO 1997 04 26 15 21 48 3.4 -9 671.90 -64.2 -62.8 -64.4 62 -99 SPO 1997 04 26 15 22 48 3.4 -9 671.90 -64.1 -62.7 -64.4 62 -99 SPO 1997 04 26 15 23 49 3.5 -9 671.90 -64.1 -62.7 -64.4 63 -99 SPO 1997 04 26 15 24 47 3.5 -9 671.90 -64.1 -62.7 -64.3 64 -99 SPO 1997 04 26 15 25 49 3.5 -9 671.90 -64.0 -62.7 -64.3 63 -99 SPO 1997 04 26 15 26 52 3.4 -9 671.90 -64.0 -62.7 -64.3 63 -99 SPO 1997 04 26 15 27 57 3.1 -9 671.90 -64.1 -62.9 -64.3 64 -99 SPO 1997 04 26 15 28 60 3.0 -9 671.90 -64.1 -63.0 -64.3 64 -99 SPO 1997 04 26 15 29 65 2.9 -9 671.90 -64.2 -63.2 -64.4 65 -99 SPO 1997 04 26 15 30 68 2.9 -9 671.90 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 26 15 31 65 2.9 -9 671.90 -64.4 -63.4 -64.4 67 -99 SPO 1997 04 26 15 32 65 2.9 -9 671.90 -64.4 -63.4 -64.5 67 -99 SPO 1997 04 26 15 33 65 3.0 -9 671.90 -64.5 -63.4 -64.5 68 -99 SPO 1997 04 26 15 34 67 3.0 -9 671.90 -64.5 -63.5 -64.5 68 -99 SPO 1997 04 26 15 35 70 2.8 -9 671.90 -64.5 -63.6 -64.5 68 -99 SPO 1997 04 26 15 36 70 2.8 -9 671.90 -64.5 -63.8 -64.5 68 -99 SPO 1997 04 26 15 37 70 3.0 -9 671.90 -64.5 -63.7 -64.5 68 -99 SPO 1997 04 26 15 38 67 3.0 -9 671.90 -64.6 -63.8 -64.5 69 -99 SPO 1997 04 26 15 39 65 3.0 -9 671.90 -64.6 -63.6 -64.5 69 -99 SPO 1997 04 26 15 40 61 3.1 -9 671.90 -64.5 -63.5 -64.5 67 -99 SPO 1997 04 26 15 41 59 3.1 -9 671.90 -64.5 -63.5 -64.5 67 -99 SPO 1997 04 26 15 42 58 3.2 -9 671.90 -64.5 -63.5 -64.5 67 -99 SPO 1997 04 26 15 43 55 3.4 -9 671.90 -64.5 -63.5 -64.5 68 -99 SPO 1997 04 26 15 44 54 3.3 -9 671.80 -64.4 -63.3 -64.5 67 -99 SPO 1997 04 26 15 45 54 3.5 -9 671.80 -64.4 -63.3 -64.5 67 -99 SPO 1997 04 26 15 46 55 3.4 -9 671.80 -64.4 -63.4 -64.5 67 -99 SPO 1997 04 26 15 47 56 3.3 -9 671.80 -64.4 -63.4 -64.5 68 -99 SPO 1997 04 26 15 48 57 3.2 -9 671.80 -64.4 -63.4 -64.4 68 -99 SPO 1997 04 26 15 49 56 3.1 -9 671.80 -64.4 -63.5 -64.4 67 -99 SPO 1997 04 26 15 50 56 3.1 -9 671.90 -64.3 -63.4 -64.4 66 -99 SPO 1997 04 26 15 51 57 3.0 -9 671.90 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 26 15 52 60 2.7 -9 671.90 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 26 15 53 66 2.6 -9 671.90 -64.3 -63.6 -64.4 66 -99 SPO 1997 04 26 15 54 72 2.4 -9 672.00 -64.3 -63.6 -64.4 66 -99 SPO 1997 04 26 15 55 72 2.4 -9 672.00 -64.4 -63.7 -64.4 67 -99 SPO 1997 04 26 15 56 73 2.5 -9 672.00 -64.4 -63.7 -64.4 67 -99 SPO 1997 04 26 15 57 72 2.6 -9 672.00 -64.4 -63.7 -64.4 67 -99 SPO 1997 04 26 15 58 73 2.6 -9 672.00 -64.4 -63.8 -64.5 67 -99 SPO 1997 04 26 15 59 75 2.7 -9 672.00 -64.5 -63.8 -64.5 68 -99 SPO 1997 04 26 16 00 77 2.5 -9 672.00 -64.5 -63.8 -64.5 68 0 SPO 1997 04 26 16 01 78 2.7 -9 672.00 -64.5 -63.8 -64.5 68 -99 SPO 1997 04 26 16 02 75 2.8 -9 672.00 -64.6 -63.7 -64.5 68 -99 SPO 1997 04 26 16 03 73 2.9 -9 672.00 -64.6 -63.7 -64.5 66 -99 SPO 1997 04 26 16 04 71 3.0 -9 672.00 -64.6 -63.6 -64.5 66 -99 SPO 1997 04 26 16 05 70 3.0 -9 672.00 -64.6 -63.6 -64.6 66 -99 SPO 1997 04 26 16 06 70 3.0 -9 671.90 -64.7 -63.5 -64.6 66 -99 SPO 1997 04 26 16 07 72 3.0 -9 671.90 -64.7 -63.5 -64.6 67 -99 SPO 1997 04 26 16 08 73 2.9 -9 672.00 -64.7 -63.5 -64.7 67 -99 SPO 1997 04 26 16 09 72 3.0 -9 672.00 -64.7 -63.5 -64.6 67 -99 SPO 1997 04 26 16 10 70 3.2 -9 672.00 -64.8 -63.5 -64.7 68 -99 SPO 1997 04 26 16 11 69 3.2 -9 671.90 -64.8 -63.4 -64.7 68 -99 SPO 1997 04 26 16 12 67 3.2 -9 672.00 -64.8 -63.4 -64.7 68 -99 SPO 1997 04 26 16 13 66 3.2 -9 672.00 -64.8 -63.3 -64.7 67 -99 SPO 1997 04 26 16 14 65 3.1 -9 671.90 -64.8 -63.3 -64.8 67 -99 SPO 1997 04 26 16 15 66 3.2 -9 671.90 -64.8 -63.2 -64.8 66 -99 SPO 1997 04 26 16 16 66 3.3 -9 671.90 -64.8 -63.2 -64.8 66 -99 SPO 1997 04 26 16 17 65 3.5 -9 671.90 -64.9 -63.2 -64.8 67 -99 SPO 1997 04 26 16 18 64 3.6 -9 671.90 -64.9 -63.1 -64.8 67 -99 SPO 1997 04 26 16 19 63 3.7 -9 671.90 -64.8 -63.1 -64.8 66 -99 SPO 1997 04 26 16 20 63 3.7 -9 671.90 -64.8 -63.1 -64.8 66 -99 SPO 1997 04 26 16 21 64 3.6 -9 671.90 -64.8 -63.1 -64.8 66 -99 SPO 1997 04 26 16 22 64 3.6 -9 671.90 -64.8 -63.1 -64.8 66 -99 SPO 1997 04 26 16 23 61 3.8 -9 671.90 -64.8 -63.1 -64.8 66 -99 SPO 1997 04 26 16 24 58 4.0 -9 671.90 -64.8 -63.0 -64.8 66 -99 SPO 1997 04 26 16 25 55 4.2 -9 671.90 -64.7 -63.0 -64.8 65 -99 SPO 1997 04 26 16 26 56 4.2 -9 671.90 -64.6 -63.0 -64.7 64 -99 SPO 1997 04 26 16 27 56 4.1 -9 671.90 -64.6 -62.9 -64.6 64 -99 SPO 1997 04 26 16 28 57 4.1 -9 671.90 -64.5 -62.9 -64.6 63 -99 SPO 1997 04 26 16 29 57 4.2 -9 671.90 -64.5 -62.9 -64.6 64 -99 SPO 1997 04 26 16 30 56 4.1 -9 671.90 -64.4 -62.9 -64.6 63 -99 SPO 1997 04 26 16 31 55 4.2 -9 671.90 -64.4 -62.8 -64.5 63 -99 SPO 1997 04 26 16 32 54 4.2 -9 671.90 -64.3 -62.8 -64.5 63 -99 SPO 1997 04 26 16 33 53 4.4 -9 671.90 -64.3 -62.8 -64.5 63 -99 SPO 1997 04 26 16 34 54 4.3 -9 671.90 -64.3 -62.8 -64.4 65 -99 SPO 1997 04 26 16 35 55 4.4 -9 671.90 -64.2 -62.8 -64.4 64 -99 SPO 1997 04 26 16 36 54 4.4 -9 671.90 -64.2 -62.8 -64.4 65 -99 SPO 1997 04 26 16 37 54 4.6 -9 671.90 -64.2 -62.8 -64.4 65 -99 SPO 1997 04 26 16 38 54 4.7 -9 671.90 -64.1 -62.7 -64.3 64 -99 SPO 1997 04 26 16 39 53 4.6 -9 671.90 -64.1 -62.7 -64.3 64 -99 SPO 1997 04 26 16 40 53 4.5 -9 671.90 -64.1 -62.7 -64.3 64 -99 SPO 1997 04 26 16 41 55 4.4 -9 671.90 -64.0 -62.6 -64.2 63 -99 SPO 1997 04 26 16 42 56 4.3 -9 672.00 -64.0 -62.7 -64.2 63 -99 SPO 1997 04 26 16 43 57 4.2 -9 672.00 -64.0 -62.6 -64.2 64 -99 SPO 1997 04 26 16 44 57 3.9 -9 672.00 -64.0 -62.6 -64.2 64 -99 SPO 1997 04 26 16 45 56 3.8 -9 671.90 -64.0 -62.7 -64.2 65 -99 SPO 1997 04 26 16 46 56 4.0 -9 671.90 -64.0 -62.7 -64.2 65 -99 SPO 1997 04 26 16 47 52 3.7 -9 671.90 -64.1 -62.8 -64.2 65 -99 SPO 1997 04 26 16 48 55 3.9 -9 671.90 -64.1 -62.8 -64.2 65 -99 SPO 1997 04 26 16 49 54 3.9 -9 671.90 -64.1 -62.6 -64.2 65 -99 SPO 1997 04 26 16 50 53 4.0 -9 671.90 -64.1 -62.7 -64.2 65 -99 SPO 1997 04 26 16 51 54 4.1 -9 671.90 -64.1 -62.6 -64.2 65 -99 SPO 1997 04 26 16 52 57 4.1 -9 671.90 -64.1 -62.6 -64.2 65 -99 SPO 1997 04 26 16 53 57 4.1 -9 671.90 -64.2 -62.5 -64.2 66 -99 SPO 1997 04 26 16 54 55 3.9 -9 671.90 -64.2 -62.6 -64.3 67 -99 SPO 1997 04 26 16 55 58 4.1 -9 671.90 -64.2 -62.6 -64.3 67 -99 SPO 1997 04 26 16 56 58 4.3 -9 671.90 -64.2 -62.6 -64.2 67 -99 SPO 1997 04 26 16 57 56 4.0 -9 671.90 -64.2 -62.6 -64.3 69 -99 SPO 1997 04 26 16 58 57 4.0 -9 671.90 -64.2 -62.6 -64.3 69 -99 SPO 1997 04 26 16 59 59 3.8 -9 672.00 -64.2 -62.6 -64.3 69 -99 SPO 1997 04 26 17 00 59 3.6 -9 672.00 -64.3 -62.7 -64.3 68 0 SPO 1997 04 26 17 01 64 3.7 -9 672.00 -64.3 -62.6 -64.4 67 -99 SPO 1997 04 26 17 02 64 3.7 -9 672.00 -64.3 -62.6 -64.4 66 -99 SPO 1997 04 26 17 03 62 3.4 -9 672.00 -64.3 -62.8 -64.4 66 -99 SPO 1997 04 26 17 04 66 3.5 -9 672.00 -64.4 -62.8 -64.4 67 -99 SPO 1997 04 26 17 05 67 3.4 -9 672.00 -64.4 -63.0 -64.4 67 -99 SPO 1997 04 26 17 06 68 3.3 -9 672.00 -64.4 -62.9 -64.5 67 -99 SPO 1997 04 26 17 07 68 3.2 -9 672.00 -64.6 -63.0 -64.5 69 -99 SPO 1997 04 26 17 08 71 3.1 -9 672.00 -64.6 -62.8 -64.6 69 -99 SPO 1997 04 26 17 09 70 2.8 -9 672.00 -64.8 -63.0 -64.6 70 -99 SPO 1997 04 26 17 10 77 2.7 -9 672.00 -65.0 -63.0 -64.7 71 -99 SPO 1997 04 26 17 11 81 2.4 -9 672.00 -65.2 -63.2 -64.8 71 -99 SPO 1997 04 26 17 12 83 2.4 -9 672.00 -65.5 -63.4 -65.0 72 -99 SPO 1997 04 26 17 13 80 2.5 -9 672.00 -65.8 -63.2 -65.1 72 -99 SPO 1997 04 26 17 14 78 2.5 -9 672.00 -65.9 -63.2 -65.2 71 -99 SPO 1997 04 26 17 15 81 2.4 -9 672.00 -66.0 -63.2 -65.3 72 -99 SPO 1997 04 26 17 16 84 2.3 -9 672.10 -66.1 -63.4 -65.4 70 -99 SPO 1997 04 26 17 17 80 2.1 -9 672.10 -66.2 -63.6 -65.4 70 -99 SPO 1997 04 26 17 18 73 2.3 -9 672.10 -66.2 -63.5 -65.5 69 -99 SPO 1997 04 26 17 19 69 2.4 -9 672.10 -66.2 -63.4 -65.6 69 -99 SPO 1997 04 26 17 20 72 2.3 -9 672.10 -66.2 -63.4 -65.6 69 -99 SPO 1997 04 26 17 21 79 2.3 -9 672.10 -66.2 -63.4 -65.6 69 -99 SPO 1997 04 26 17 22 76 2.3 -9 672.10 -66.1 -63.3 -65.7 67 -99 SPO 1997 04 26 17 23 70 2.5 -9 672.10 -66.1 -63.3 -65.7 66 -99 SPO 1997 04 26 17 24 62 2.7 -9 672.10 -66.2 -63.2 -65.7 66 -99 SPO 1997 04 26 17 25 59 2.8 -9 672.10 -66.2 -63.0 -65.8 66 -99 SPO 1997 04 26 17 26 58 2.9 -9 672.00 -66.2 -63.0 -65.8 65 -99 SPO 1997 04 26 17 27 58 3.0 -9 672.00 -66.3 -63.0 -65.9 66 -99 SPO 1997 04 26 17 28 57 3.2 -9 672.00 -66.3 -62.9 -65.9 66 -99 SPO 1997 04 26 17 29 57 3.3 -9 672.00 -66.2 -62.9 -65.9 65 -99 SPO 1997 04 26 17 30 57 3.5 -9 672.00 -66.2 -62.8 -65.9 65 -99 SPO 1997 04 26 17 31 53 3.7 -9 672.00 -66.1 -62.8 -65.9 64 -99 SPO 1997 04 26 17 32 51 3.8 -9 672.00 -66.2 -62.7 -66.0 65 -99 SPO 1997 04 26 17 33 49 4.0 -9 672.00 -66.2 -62.6 -66.0 65 -99 SPO 1997 04 26 17 34 48 4.1 -9 672.00 -66.3 -62.5 -66.1 65 -99 SPO 1997 04 26 17 35 49 4.0 -9 672.00 -66.4 -62.4 -66.1 66 -99 SPO 1997 04 26 17 36 49 4.1 -9 671.90 -66.4 -62.3 -66.2 66 -99 SPO 1997 04 26 17 37 50 4.1 -9 671.90 -66.4 -62.3 -66.2 64 -99 SPO 1997 04 26 17 38 51 4.0 -9 671.90 -66.4 -62.3 -66.2 63 -99 SPO 1997 04 26 17 39 52 4.0 -9 671.90 -66.4 -62.3 -66.3 63 -99 SPO 1997 04 26 17 40 54 4.2 -9 671.90 -66.4 -62.2 -66.3 62 -99 SPO 1997 04 26 17 41 56 4.5 -9 672.00 -66.2 -61.9 -66.2 61 -99 SPO 1997 04 26 17 42 55 4.3 -9 672.00 -66.0 -61.8 -66.0 60 -99 SPO 1997 04 26 17 43 55 3.8 -9 672.00 -66.1 -62.2 -66.1 61 -99 SPO 1997 04 26 17 44 55 4.1 -9 672.00 -66.2 -62.4 -66.2 64 -99 SPO 1997 04 26 17 45 54 4.3 -9 672.00 -66.2 -62.4 -66.2 64 -99 SPO 1997 04 26 17 46 53 4.5 -9 672.00 -66.2 -62.4 -66.2 62 -99 SPO 1997 04 26 17 47 53 4.7 -9 672.00 -66.2 -62.4 -66.2 61 -99 SPO 1997 04 26 17 48 54 4.5 -9 672.00 -66.1 -62.2 -66.1 61 -99 SPO 1997 04 26 17 49 56 4.2 -9 672.00 -66.2 -62.3 -66.2 62 -99 SPO 1997 04 26 17 50 57 4.1 -9 672.00 -66.3 -62.3 -66.3 63 -99 SPO 1997 04 26 17 51 58 4.0 -9 672.00 -66.4 -62.2 -66.4 63 -99 SPO 1997 04 26 17 52 59 3.9 -9 672.00 -66.4 -62.4 -66.4 64 -99 SPO 1997 04 26 17 53 60 3.8 -9 672.00 -66.6 -62.7 -66.5 66 -99 SPO 1997 04 26 17 54 60 3.6 -9 672.00 -66.7 -63.0 -66.6 65 -99 SPO 1997 04 26 17 55 60 3.5 -9 672.00 -66.8 -63.0 -66.6 65 -99 SPO 1997 04 26 17 56 61 3.2 -9 672.00 -66.9 -63.1 -66.7 66 -99 SPO 1997 04 26 17 57 64 3.1 -9 672.00 -67.0 -63.2 -66.8 66 -99 SPO 1997 04 26 17 58 68 3.0 -9 672.00 -67.0 -63.2 -66.8 65 -99 SPO 1997 04 26 17 59 67 3.1 -9 672.00 -67.1 -63.3 -66.8 64 -99 SPO 1997 04 26 18 00 64 3.2 -9 672.00 -67.2 -63.3 -66.9 65 0 SPO 1997 04 26 18 01 60 3.5 -9 672.00 -67.2 -63.3 -66.9 64 -99 SPO 1997 04 26 18 02 56 3.6 -9 671.90 -67.2 -63.2 -67.0 62 -99 SPO 1997 04 26 18 03 55 3.7 -9 671.90 -67.3 -63.2 -67.0 63 -99 SPO 1997 04 26 18 04 54 3.7 -9 671.90 -67.4 -63.2 -67.1 64 -99 SPO 1997 04 26 18 05 54 3.6 -9 671.90 -67.4 -63.2 -67.2 64 -99 SPO 1997 04 26 18 06 54 3.6 -9 671.90 -67.5 -63.3 -67.2 64 -99 SPO 1997 04 26 18 07 55 3.5 -9 671.90 -67.6 -63.2 -67.3 64 -99 SPO 1997 04 26 18 08 55 3.5 -9 671.90 -67.5 -63.1 -67.3 64 -99 SPO 1997 04 26 18 09 55 3.6 -9 672.00 -67.6 -63.2 -67.3 64 -99 SPO 1997 04 26 18 10 55 3.7 -9 671.90 -67.5 -63.1 -67.3 63 -99 SPO 1997 04 26 18 11 54 4.0 -9 671.90 -67.5 -63.0 -67.3 63 -99 SPO 1997 04 26 18 12 54 4.0 -9 671.90 -67.5 -62.8 -67.3 63 -99 SPO 1997 04 26 18 13 53 4.0 -9 671.90 -67.4 -62.8 -67.3 61 -99 SPO 1997 04 26 18 14 54 3.9 -9 671.90 -67.4 -62.8 -67.3 61 -99 SPO 1997 04 26 18 15 54 4.0 -9 671.90 -67.3 -62.8 -67.3 60 -99 SPO 1997 04 26 18 16 53 4.1 -9 671.90 -67.3 -63.1 -67.3 61 -99 SPO 1997 04 26 18 17 52 4.1 -9 672.00 -67.3 -63.3 -67.3 61 -99 SPO 1997 04 26 18 18 53 4.1 -9 672.00 -67.3 -63.2 -67.3 61 -99 SPO 1997 04 26 18 19 53 4.1 -9 672.00 -67.2 -63.1 -67.2 60 -99 SPO 1997 04 26 18 20 52 4.1 -9 672.00 -67.2 -63.0 -67.2 60 -99 SPO 1997 04 26 18 21 54 4.2 -9 672.00 -67.0 -62.8 -67.1 59 -99 SPO 1997 04 26 18 22 55 3.8 -9 672.00 -67.1 -63.0 -67.2 60 -99 SPO 1997 04 26 18 23 54 3.9 -9 672.00 -67.2 -62.9 -67.2 61 -99 SPO 1997 04 26 18 24 53 4.0 -9 672.00 -67.2 -62.8 -67.2 60 -99 SPO 1997 04 26 18 25 54 4.2 -9 672.00 -67.2 -62.8 -67.2 60 -99 SPO 1997 04 26 18 26 54 3.9 -9 672.00 -67.3 -62.8 -67.3 61 -99 SPO 1997 04 26 18 27 54 3.9 -9 672.00 -67.4 -62.8 -67.4 62 -99 SPO 1997 04 26 18 28 54 4.0 -9 672.00 -67.4 -62.7 -67.4 62 -99 SPO 1997 04 26 18 29 56 3.9 -9 672.00 -67.4 -62.8 -67.4 62 -99 SPO 1997 04 26 18 30 57 3.9 -9 672.00 -67.6 -63.0 -67.5 64 -99 SPO 1997 04 26 18 31 57 3.9 -9 672.00 -67.7 -63.2 -67.6 64 -99 SPO 1997 04 26 18 32 57 3.9 -9 672.00 -67.8 -63.3 -67.6 64 -99 SPO 1997 04 26 18 33 57 4.1 -9 672.00 -67.8 -63.4 -67.7 63 -99 SPO 1997 04 26 18 34 56 4.2 -9 672.00 -67.8 -63.2 -67.7 62 -99 SPO 1997 04 26 18 35 57 4.2 -9 672.00 -67.8 -63.1 -67.7 61 -99 SPO 1997 04 26 18 36 57 4.2 -9 672.00 -67.8 -63.0 -67.7 61 -99 SPO 1997 04 26 18 37 58 4.1 -9 672.00 -67.8 -63.0 -67.7 61 -99 SPO 1997 04 26 18 38 59 4.1 -9 672.00 -67.8 -63.2 -67.7 61 -99 SPO 1997 04 26 18 39 58 4.2 -9 672.00 -67.8 -63.0 -67.7 61 -99 SPO 1997 04 26 18 40 57 4.2 -9 672.00 -67.7 -63.0 -67.7 60 -99 SPO 1997 04 26 18 41 55 4.3 -9 672.00 -67.6 -62.9 -67.6 60 -99 SPO 1997 04 26 18 42 53 4.5 -9 672.00 -67.4 -62.6 -67.6 59 -99 SPO 1997 04 26 18 43 53 4.5 -9 672.00 -67.3 -62.5 -67.5 59 -99 SPO 1997 04 26 18 44 52 4.6 -9 672.00 -67.3 -62.6 -67.4 59 -99 SPO 1997 04 26 18 45 51 4.6 -9 672.00 -67.2 -62.8 -67.4 60 -99 SPO 1997 04 26 18 46 51 4.6 -9 672.00 -67.2 -62.8 -67.4 60 -99 SPO 1997 04 26 18 47 51 4.6 -9 671.90 -67.2 -62.8 -67.4 60 -99 SPO 1997 04 26 18 48 52 4.4 -9 671.90 -67.2 -62.9 -67.4 60 -99 SPO 1997 04 26 18 49 53 4.4 -9 671.90 -67.3 -62.9 -67.4 61 -99 SPO 1997 04 26 18 50 53 4.3 -9 671.90 -67.2 -62.9 -67.4 60 -99 SPO 1997 04 26 18 51 54 4.2 -9 671.90 -67.2 -62.8 -67.4 60 -99 SPO 1997 04 26 18 52 53 4.3 -9 671.90 -67.3 -62.8 -67.4 61 -99 SPO 1997 04 26 18 53 54 4.3 -9 671.90 -67.2 -62.8 -67.4 60 -99 SPO 1997 04 26 18 54 55 4.3 -9 671.90 -67.2 -62.6 -67.4 61 -99 SPO 1997 04 26 18 55 54 4.4 -9 671.90 -67.2 -62.6 -67.4 60 -99 SPO 1997 04 26 18 56 53 4.4 -9 671.90 -67.2 -62.7 -67.4 60 -99 SPO 1997 04 26 18 57 53 4.4 -9 671.90 -67.2 -62.6 -67.3 60 -99 SPO 1997 04 26 18 58 52 4.4 -9 672.00 -67.1 -62.6 -67.3 60 -99 SPO 1997 04 26 18 59 52 4.3 -9 672.00 -67.0 -62.6 -67.2 59 -99 SPO 1997 04 26 19 00 54 4.2 -9 672.00 -67.0 -62.6 -67.2 59 0 SPO 1997 04 26 19 01 54 4.1 -9 672.00 -67.0 -62.7 -67.2 59 -99 SPO 1997 04 26 19 02 54 4.1 -9 672.00 -67.1 -62.7 -67.2 60 -99 SPO 1997 04 26 19 03 56 4.0 -9 672.00 -67.1 -62.6 -67.2 61 -99 SPO 1997 04 26 19 04 57 3.9 -9 672.10 -67.1 -62.6 -67.3 61 -99 SPO 1997 04 26 19 05 59 3.7 -9 672.10 -67.1 -62.8 -67.3 61 -99 SPO 1997 04 26 19 06 59 3.6 -9 672.10 -67.1 -62.8 -67.2 61 -99 SPO 1997 04 26 19 07 60 3.8 -9 672.10 -67.1 -62.8 -67.2 61 -99 SPO 1997 04 26 19 08 60 4.0 -9 672.10 -67.1 -62.7 -67.3 61 -99 SPO 1997 04 26 19 09 60 3.9 -9 672.10 -67.1 -62.6 -67.2 61 -99 SPO 1997 04 26 19 10 60 4.0 -9 672.10 -67.1 -62.5 -67.2 60 -99 SPO 1997 04 26 19 11 59 4.2 -9 672.10 -67.1 -62.5 -67.3 60 -99 SPO 1997 04 26 19 12 60 4.2 -9 672.10 -67.1 -62.4 -67.3 60 -99 SPO 1997 04 26 19 13 62 4.3 -9 672.10 -67.2 -62.5 -67.3 61 -99 SPO 1997 04 26 19 14 63 4.2 -9 672.10 -67.2 -62.6 -67.3 61 -99 SPO 1997 04 26 19 15 64 4.1 -9 672.10 -67.3 -62.7 -67.4 63 -99 SPO 1997 04 26 19 16 65 4.2 -9 672.10 -67.3 -62.8 -67.4 63 -99 SPO 1997 04 26 19 17 66 4.1 -9 672.10 -67.3 -62.8 -67.4 63 -99 SPO 1997 04 26 19 18 67 4.1 -9 672.10 -67.3 -62.9 -67.4 62 -99 SPO 1997 04 26 19 19 66 4.2 -9 672.10 -67.3 -63.0 -67.4 62 -99 SPO 1997 04 26 19 20 65 4.3 -9 672.00 -67.3 -62.9 -67.4 62 -99 SPO 1997 04 26 19 21 63 4.2 -9 672.10 -67.4 -63.1 -67.4 62 -99 SPO 1997 04 26 19 22 63 4.2 -9 672.10 -67.4 -62.9 -67.4 62 -99 SPO 1997 04 26 19 23 64 4.0 -9 672.10 -67.4 -63.1 -67.5 62 -99 SPO 1997 04 26 19 24 64 3.8 -9 672.20 -67.4 -63.2 -67.5 62 -99 SPO 1997 04 26 19 25 67 3.6 -9 672.20 -67.4 -63.4 -67.5 62 -99 SPO 1997 04 26 19 26 68 3.6 -9 672.20 -67.4 -63.4 -67.5 62 -99 SPO 1997 04 26 19 27 68 3.5 -9 672.20 -67.5 -63.6 -67.5 63 -99 SPO 1997 04 26 19 28 67 3.3 -9 672.20 -67.6 -63.6 -67.6 64 -99 SPO 1997 04 26 19 29 69 3.5 -9 672.20 -67.6 -63.4 -67.6 64 -99 SPO 1997 04 26 19 30 68 3.2 -9 672.20 -67.7 -63.9 -67.6 64 -99 SPO 1997 04 26 19 31 70 3.8 -9 672.20 -67.7 -63.7 -67.7 64 -99 SPO 1997 04 26 19 32 69 3.6 -9 672.20 -67.8 -63.6 -67.7 64 -99 SPO 1997 04 26 19 33 69 3.7 -9 672.20 -67.8 -63.7 -67.7 64 -99 SPO 1997 04 26 19 34 69 3.8 -9 672.20 -67.8 -63.5 -67.8 63 -99 SPO 1997 04 26 19 35 71 3.8 -9 672.20 -67.9 -63.6 -67.8 64 -99 SPO 1997 04 26 19 36 70 3.7 -9 672.20 -68.0 -63.8 -67.8 64 -99 SPO 1997 04 26 19 37 74 3.6 -9 672.20 -67.9 -63.8 -67.8 63 -99 SPO 1997 04 26 19 38 72 3.7 -9 672.20 -68.0 -63.7 -67.9 64 -99 SPO 1997 04 26 19 39 69 4.3 -9 672.20 -68.1 -63.1 -67.9 64 -99 SPO 1997 04 26 19 40 68 3.8 -9 672.10 -68.0 -63.6 -67.9 63 -99 SPO 1997 04 26 19 41 68 4.2 -9 672.20 -68.0 -63.0 -67.9 63 -99 SPO 1997 04 26 19 42 68 3.9 -9 672.20 -67.9 -63.6 -67.9 62 -99 SPO 1997 04 26 19 43 67 4.2 -9 672.10 -67.9 -63.6 -67.9 62 -99 SPO 1997 04 26 19 44 66 4.0 -9 672.10 -67.9 -63.6 -67.9 62 -99 SPO 1997 04 26 19 45 66 4.3 -9 672.10 -67.9 -63.6 -67.9 62 -99 SPO 1997 04 26 19 46 65 4.2 -9 672.10 -67.8 -63.7 -67.8 61 -99 SPO 1997 04 26 19 47 65 4.3 -9 672.20 -67.8 -63.4 -67.8 61 -99 SPO 1997 04 26 19 48 65 4.1 -9 672.20 -67.7 -63.2 -67.8 60 -99 SPO 1997 04 26 19 49 66 4.2 -9 672.10 -67.7 -63.1 -67.8 61 -99 SPO 1997 04 26 19 50 67 4.2 -9 672.10 -67.7 -62.9 -67.8 61 -99 SPO 1997 04 26 19 51 65 4.4 -9 672.10 -67.7 -62.9 -67.8 62 -99 SPO 1997 04 26 19 52 65 4.4 -9 672.10 -67.6 -63.0 -67.7 61 -99 SPO 1997 04 26 19 53 64 4.3 -9 672.10 -67.5 -63.0 -67.7 60 -99 SPO 1997 04 26 19 54 63 4.4 -9 672.10 -67.5 -63.0 -67.7 59 -99 SPO 1997 04 26 19 55 64 4.2 -9 672.10 -67.5 -63.0 -67.7 59 -99 SPO 1997 04 26 19 56 64 4.1 -9 672.10 -67.5 -63.1 -67.7 59 -99 SPO 1997 04 26 19 57 65 4.0 -9 672.10 -67.6 -63.2 -67.7 60 -99 SPO 1997 04 26 19 58 65 3.8 -9 672.10 -67.6 -63.1 -67.7 60 -99 SPO 1997 04 26 19 59 67 3.7 -9 672.10 -67.6 -63.3 -67.7 61 -99 SPO 1997 04 26 20 00 69 3.8 -9 672.10 -67.6 -63.0 -67.7 61 0 SPO 1997 04 26 20 01 68 3.6 -9 672.20 -67.6 -63.2 -67.7 61 -99 SPO 1997 04 26 20 02 67 3.4 -9 672.20 -67.6 -63.4 -67.7 61 -99 SPO 1997 04 26 20 03 65 3.5 -9 672.20 -67.6 -63.2 -67.7 63 -99 SPO 1997 04 26 20 04 64 3.6 -9 672.20 -67.6 -63.2 -67.7 63 -99 SPO 1997 04 26 20 05 63 3.5 -9 672.20 -67.5 -63.3 -67.7 62 -99 SPO 1997 04 26 20 06 63 3.6 -9 672.20 -67.5 -63.4 -67.6 60 -99 SPO 1997 04 26 20 07 62 3.6 -9 672.10 -67.4 -63.3 -67.6 59 -99 SPO 1997 04 26 20 08 60 3.9 -9 672.10 -67.4 -63.2 -67.6 59 -99 SPO 1997 04 26 20 09 58 3.9 -9 672.10 -67.4 -62.8 -67.6 59 -99 SPO 1997 04 26 20 10 58 3.7 -9 672.10 -67.4 -62.8 -67.6 61 -99 SPO 1997 04 26 20 11 59 3.8 -9 672.10 -67.4 -62.8 -67.6 62 -99 SPO 1997 04 26 20 12 58 3.7 -9 672.10 -67.4 -63.0 -67.6 62 -99 SPO 1997 04 26 20 13 58 3.8 -9 672.10 -67.4 -62.9 -67.5 62 -99 SPO 1997 04 26 20 14 58 3.7 -9 672.10 -67.4 -62.8 -67.5 62 -99 SPO 1997 04 26 20 15 57 3.8 -9 672.10 -67.3 -62.6 -67.5 61 -99 SPO 1997 04 26 20 16 56 3.6 -9 672.20 -67.3 -62.7 -67.5 61 -99 SPO 1997 04 26 20 17 56 3.5 -9 672.20 -67.3 -63.0 -67.4 61 -99 SPO 1997 04 26 20 18 57 3.4 -9 672.20 -67.2 -62.9 -67.4 60 -99 SPO 1997 04 26 20 19 59 3.3 -9 672.20 -67.2 -62.9 -67.4 60 -99 SPO 1997 04 26 20 20 61 3.1 -9 672.20 -67.2 -63.2 -67.4 60 -99 SPO 1997 04 26 20 21 61 3.2 -9 672.20 -67.2 -63.5 -67.4 60 -99 SPO 1997 04 26 20 22 61 3.3 -9 672.20 -67.2 -63.6 -67.4 60 -99 SPO 1997 04 26 20 23 60 3.0 -9 672.20 -67.2 -63.5 -67.4 60 -99 SPO 1997 04 26 20 24 60 3.3 -9 672.20 -67.2 -63.6 -67.4 61 -99 SPO 1997 04 26 20 25 60 3.2 -9 672.20 -67.2 -63.6 -67.4 61 -99 SPO 1997 04 26 20 26 60 3.2 -9 672.20 -67.2 -63.8 -67.4 62 -99 SPO 1997 04 26 20 27 61 3.3 -9 672.20 -67.1 -63.8 -67.3 61 -99 SPO 1997 04 26 20 28 62 3.4 -9 672.20 -67.0 -63.8 -67.2 60 -99 SPO 1997 04 26 20 29 61 3.4 -9 672.20 -67.0 -63.7 -67.2 62 -99 SPO 1997 04 26 20 30 62 3.3 -9 672.20 -67.0 -63.7 -67.2 60 -99 SPO 1997 04 26 20 31 62 3.6 -9 672.20 -67.0 -63.6 -67.2 62 -99 SPO 1997 04 26 20 32 62 3.9 -9 672.20 -67.1 -63.2 -67.2 63 -99 SPO 1997 04 26 20 33 62 3.8 -9 672.20 -67.2 -63.1 -67.3 64 -99 SPO 1997 04 26 20 34 62 3.8 -9 672.20 -67.2 -63.1 -67.3 64 -99 SPO 1997 04 26 20 35 63 3.7 -9 672.20 -67.3 -63.1 -67.4 65 -99 SPO 1997 04 26 20 36 63 3.5 -9 672.20 -67.3 -63.4 -67.4 65 -99 SPO 1997 04 26 20 37 64 3.6 -9 672.20 -67.2 -63.5 -67.4 64 -99 SPO 1997 04 26 20 38 64 3.4 -9 672.20 -67.3 -63.7 -67.4 63 -99 SPO 1997 04 26 20 39 66 3.5 -9 672.20 -67.3 -63.7 -67.4 65 -99 SPO 1997 04 26 20 40 68 3.5 -9 672.20 -67.3 -63.8 -67.3 65 -99 SPO 1997 04 26 20 41 68 3.4 -9 672.20 -67.3 -64.0 -67.3 65 -99 SPO 1997 04 26 20 42 68 3.1 -9 672.30 -67.3 -64.0 -67.4 63 -99 SPO 1997 04 26 20 43 66 3.4 -9 672.30 -67.2 -64.0 -67.4 62 -99 SPO 1997 04 26 20 44 68 3.3 -9 672.30 -67.2 -64.0 -67.3 64 -99 SPO 1997 04 26 20 45 70 3.2 -9 672.30 -67.1 -64.1 -67.2 63 -99 SPO 1997 04 26 20 46 69 3.3 -9 672.30 -67.1 -64.2 -67.3 64 -99 SPO 1997 04 26 20 47 67 3.1 -9 672.30 -67.2 -64.3 -67.3 65 -99 SPO 1997 04 26 20 48 67 3.1 -9 672.30 -67.2 -64.4 -67.3 65 -99 SPO 1997 04 26 20 49 67 3.0 -9 672.30 -67.2 -64.2 -67.3 65 -99 SPO 1997 04 26 20 50 67 3.0 -9 672.30 -67.2 -64.3 -67.3 64 -99 SPO 1997 04 26 20 51 68 2.9 -9 672.30 -67.3 -64.2 -67.4 65 -99 SPO 1997 04 26 20 52 67 2.9 -9 672.30 -67.3 -64.4 -67.4 63 -99 SPO 1997 04 26 20 53 65 3.0 -9 672.30 -67.4 -64.4 -67.4 64 -99 SPO 1997 04 26 20 54 64 3.2 -9 672.30 -67.4 -64.4 -67.4 64 -99 SPO 1997 04 26 20 55 61 3.3 -9 672.30 -67.4 -64.2 -67.4 64 -99 SPO 1997 04 26 20 56 62 3.3 -9 672.30 -67.4 -64.0 -67.5 64 -99 SPO 1997 04 26 20 57 63 3.3 -9 672.30 -67.4 -63.9 -67.4 64 -99 SPO 1997 04 26 20 58 63 3.5 -9 672.20 -67.4 -63.8 -67.4 64 -99 SPO 1997 04 26 20 59 64 3.5 -9 672.20 -67.5 -63.7 -67.5 66 -99 SPO 1997 04 26 21 00 63 3.4 -9 672.20 -67.5 -63.7 -67.5 66 0 SPO 1997 04 26 21 01 63 3.5 -9 672.20 -67.5 -63.6 -67.5 64 -99 SPO 1997 04 26 21 02 64 3.5 -9 672.20 -67.5 -63.6 -67.5 64 -99 SPO 1997 04 26 21 03 64 3.3 -9 672.20 -67.5 -63.5 -67.6 64 -99 SPO 1997 04 26 21 04 64 3.4 -9 672.20 -67.5 -63.6 -67.6 63 -99 SPO 1997 04 26 21 05 64 3.5 -9 672.20 -67.5 -63.6 -67.6 63 -99 SPO 1997 04 26 21 06 63 3.7 -9 672.20 -67.6 -63.4 -67.6 64 -99 SPO 1997 04 26 21 07 61 3.7 -9 672.20 -67.6 -63.3 -67.6 64 -99 SPO 1997 04 26 21 08 59 3.7 -9 672.20 -67.5 -63.2 -67.6 63 -99 SPO 1997 04 26 21 09 58 3.8 -9 672.20 -67.5 -63.0 -67.6 63 -99 SPO 1997 04 26 21 10 57 3.8 -9 672.20 -67.5 -62.9 -67.5 63 -99 SPO 1997 04 26 21 11 58 3.8 -9 672.20 -67.4 -63.0 -67.5 63 -99 SPO 1997 04 26 21 12 57 3.6 -9 672.20 -67.4 -62.9 -67.5 63 -99 SPO 1997 04 26 21 13 58 3.7 -9 672.20 -67.4 -63.0 -67.4 63 -99 SPO 1997 04 26 21 14 57 3.5 -9 672.20 -67.3 -62.9 -67.4 62 -99 SPO 1997 04 26 21 15 57 3.6 -9 672.20 -67.3 -62.8 -67.4 63 -99 SPO 1997 04 26 21 16 57 3.5 -9 672.20 -67.3 -62.6 -67.4 63 -99 SPO 1997 04 26 21 17 58 3.5 -9 672.20 -67.3 -62.8 -67.4 63 -99 SPO 1997 04 26 21 18 59 3.5 -9 672.20 -67.2 -62.6 -67.3 62 -99 SPO 1997 04 26 21 19 60 3.5 -9 672.20 -67.2 -62.4 -67.3 62 -99 SPO 1997 04 26 21 20 62 3.4 -9 672.20 -67.1 -62.5 -67.3 61 -99 SPO 1997 04 26 21 21 64 3.4 -9 672.20 -67.1 -62.8 -67.3 63 -99 SPO 1997 04 26 21 22 65 3.3 -9 672.20 -67.1 -63.1 -67.3 64 -99 SPO 1997 04 26 21 23 66 3.4 -9 672.30 -67.1 -63.0 -67.3 64 -99 SPO 1997 04 26 21 24 66 3.3 -9 672.30 -67.1 -63.2 -67.3 64 -99 SPO 1997 04 26 21 25 68 3.3 -9 672.30 -67.1 -63.3 -67.3 64 -99 SPO 1997 04 26 21 26 67 3.1 -9 672.30 -67.1 -63.5 -67.3 64 -99 SPO 1997 04 26 21 27 66 3.3 -9 672.20 -67.1 -63.5 -67.2 64 -99 SPO 1997 04 26 21 28 65 3.3 -9 672.30 -67.1 -63.2 -67.2 64 -99 SPO 1997 04 26 21 29 66 3.5 -9 672.20 -67.1 -63.1 -67.3 64 -99 SPO 1997 04 26 21 30 68 3.5 -9 672.20 -67.1 -63.1 -67.3 64 -99 SPO 1997 04 26 21 31 66 3.4 -9 672.30 -67.1 -63.2 -67.2 64 -99 SPO 1997 04 26 21 32 65 3.4 -9 672.30 -67.1 -63.4 -67.2 64 -99 SPO 1997 04 26 21 33 63 3.5 -9 672.20 -67.1 -63.3 -67.2 64 -99 SPO 1997 04 26 21 34 61 3.7 -9 672.20 -67.1 -63.0 -67.2 64 -99 SPO 1997 04 26 21 35 60 3.6 -9 672.20 -67.1 -63.1 -67.2 65 -99 SPO 1997 04 26 21 36 60 3.5 -9 672.20 -67.1 -63.3 -67.2 64 -99 SPO 1997 04 26 21 37 59 3.5 -9 672.20 -67.1 -63.6 -67.2 64 -99 SPO 1997 04 26 21 38 58 3.5 -9 672.20 -67.1 -63.6 -67.2 64 -99 SPO 1997 04 26 21 39 58 3.6 -9 672.20 -67.1 -63.4 -67.2 64 -99 SPO 1997 04 26 21 40 57 3.7 -9 672.20 -67.1 -63.1 -67.2 64 -99 SPO 1997 04 26 21 41 56 3.7 -9 672.20 -67.1 -63.0 -67.2 64 -99 SPO 1997 04 26 21 42 57 3.7 -9 672.20 -67.0 -63.0 -67.1 63 -99 SPO 1997 04 26 21 43 58 3.6 -9 672.20 -67.0 -63.2 -67.2 63 -99 SPO 1997 04 26 21 44 59 3.6 -9 672.20 -67.0 -63.2 -67.2 63 -99 SPO 1997 04 26 21 45 60 3.5 -9 672.20 -67.0 -63.0 -67.1 63 -99 SPO 1997 04 26 21 46 58 3.6 -9 672.20 -67.0 -63.1 -67.1 63 -99 SPO 1997 04 26 21 47 57 3.6 -9 672.20 -67.0 -63.0 -67.1 63 -99 SPO 1997 04 26 21 48 55 3.6 -9 672.20 -66.9 -63.2 -67.1 62 -99 SPO 1997 04 26 21 49 54 3.6 -9 672.20 -66.9 -63.3 -67.1 62 -99 SPO 1997 04 26 21 50 54 3.7 -9 672.20 -67.0 -63.3 -67.1 63 -99 SPO 1997 04 26 21 51 54 3.9 -9 672.20 -66.9 -63.4 -67.1 62 -99 SPO 1997 04 26 21 52 55 3.6 -9 672.20 -66.9 -63.2 -67.1 62 -99 SPO 1997 04 26 21 53 56 3.6 -9 672.20 -66.9 -63.2 -67.1 63 -99 SPO 1997 04 26 21 54 56 3.7 -9 672.20 -67.0 -63.2 -67.1 64 -99 SPO 1997 04 26 21 55 55 3.5 -9 672.20 -67.0 -63.4 -67.1 65 -99 SPO 1997 04 26 21 56 55 3.5 -9 672.20 -67.0 -63.7 -67.1 65 -99 SPO 1997 04 26 21 57 56 3.5 -9 672.20 -67.0 -63.8 -67.1 65 -99 SPO 1997 04 26 21 58 55 3.5 -9 672.20 -67.0 -63.7 -67.1 64 -99 SPO 1997 04 26 21 59 53 3.7 -9 672.20 -67.0 -63.5 -67.1 64 -99 SPO 1997 04 26 22 00 52 3.8 -9 672.20 -67.0 -63.2 -67.1 63 0 SPO 1997 04 26 22 01 52 3.9 -9 672.20 -67.0 -63.1 -67.1 63 -99 SPO 1997 04 26 22 02 53 4.0 -9 672.20 -67.0 -63.0 -67.1 63 -99 SPO 1997 04 26 22 03 53 3.9 -9 672.20 -66.9 -63.1 -67.0 62 -99 SPO 1997 04 26 22 04 55 3.8 -9 672.20 -66.9 -63.3 -67.0 62 -99 SPO 1997 04 26 22 05 55 3.8 -9 672.20 -66.9 -63.5 -67.0 63 -99 SPO 1997 04 26 22 06 56 3.6 -9 672.20 -66.9 -63.5 -67.0 63 -99 SPO 1997 04 26 22 07 56 3.7 -9 672.20 -66.9 -63.6 -67.0 64 -99 SPO 1997 04 26 22 08 55 3.8 -9 672.20 -66.9 -63.6 -67.0 64 -99 SPO 1997 04 26 22 09 54 3.7 -9 672.20 -66.9 -63.5 -67.0 64 -99 SPO 1997 04 26 22 10 53 3.7 -9 672.20 -66.9 -63.5 -67.0 65 -99 SPO 1997 04 26 22 11 54 3.7 -9 672.20 -66.9 -63.6 -67.0 65 -99 SPO 1997 04 26 22 12 54 3.8 -9 672.20 -66.9 -63.6 -67.0 65 -99 SPO 1997 04 26 22 13 55 3.6 -9 672.20 -66.9 -63.6 -67.0 64 -99 SPO 1997 04 26 22 14 55 3.7 -9 672.20 -66.9 -63.7 -67.0 64 -99 SPO 1997 04 26 22 15 54 3.7 -9 672.20 -66.9 -63.7 -67.0 64 -99 SPO 1997 04 26 22 16 54 3.7 -9 672.20 -66.9 -63.7 -67.0 64 -99 SPO 1997 04 26 22 17 54 3.7 -9 672.20 -66.9 -63.7 -67.0 64 -99 SPO 1997 04 26 22 18 56 3.6 -9 672.20 -66.9 -63.7 -67.0 64 -99 SPO 1997 04 26 22 19 57 3.6 -9 672.20 -66.9 -63.8 -67.0 65 -99 SPO 1997 04 26 22 20 58 3.6 -9 672.20 -66.9 -64.0 -67.0 64 -99 SPO 1997 04 26 22 21 56 3.6 -9 672.20 -66.9 -64.1 -67.0 64 -99 SPO 1997 04 26 22 22 54 3.8 -9 672.20 -66.9 -63.9 -67.0 64 -99 SPO 1997 04 26 22 23 52 3.7 -9 672.20 -66.9 -63.7 -67.0 63 -99 SPO 1997 04 26 22 24 51 3.8 -9 672.20 -66.9 -63.6 -67.0 63 -99 SPO 1997 04 26 22 25 50 3.8 -9 672.20 -66.9 -63.6 -67.0 63 -99 SPO 1997 04 26 22 26 49 3.8 -9 672.20 -66.8 -63.5 -67.0 62 -99 SPO 1997 04 26 22 27 47 3.8 -9 672.20 -66.8 -63.6 -67.0 63 -99 SPO 1997 04 26 22 28 48 3.8 -9 672.20 -66.8 -63.5 -66.9 63 -99 SPO 1997 04 26 22 29 47 3.8 -9 672.20 -66.8 -63.4 -66.9 65 -99 SPO 1997 04 26 22 30 46 3.8 -9 672.20 -66.8 -63.4 -66.9 65 -99 SPO 1997 04 26 22 31 45 3.9 -9 672.20 -66.7 -63.4 -66.8 64 -99 SPO 1997 04 26 22 32 45 3.9 -9 672.20 -66.7 -63.6 -66.8 64 -99 SPO 1997 04 26 22 33 45 4.0 -9 672.20 -66.7 -63.5 -66.8 64 -99 SPO 1997 04 26 22 34 45 4.3 -9 672.20 -66.6 -63.4 -66.8 64 -99 SPO 1997 04 26 22 35 43 4.3 -9 672.10 -66.6 -63.4 -66.7 64 -99 SPO 1997 04 26 22 36 42 4.5 -9 672.10 -66.6 -63.3 -66.7 64 -99 SPO 1997 04 26 22 37 41 4.6 -9 672.10 -66.5 -63.3 -66.6 63 -99 SPO 1997 04 26 22 38 39 4.6 -9 672.10 -66.4 -63.2 -66.6 62 -99 SPO 1997 04 26 22 39 37 4.6 -9 672.10 -66.3 -63.0 -66.5 61 -99 SPO 1997 04 26 22 40 37 4.8 -9 672.00 -66.2 -62.8 -66.4 61 -99 SPO 1997 04 26 22 41 37 4.8 -9 672.00 -66.0 -62.5 -66.2 62 -99 SPO 1997 04 26 22 42 37 4.8 -9 672.00 -66.0 -62.3 -66.2 62 -99 SPO 1997 04 26 22 43 36 4.7 -9 672.00 -65.9 -62.3 -66.1 62 -99 SPO 1997 04 26 22 44 37 4.8 -9 672.00 -65.9 -62.5 -66.1 62 -99 SPO 1997 04 26 22 45 37 4.6 -9 672.00 -65.8 -62.6 -66.1 61 -99 SPO 1997 04 26 22 46 38 4.3 -9 672.00 -65.8 -62.7 -66.0 61 -99 SPO 1997 04 26 22 47 39 4.3 -9 672.00 -65.8 -62.7 -66.0 62 -99 SPO 1997 04 26 22 48 39 4.2 -9 672.00 -65.8 -62.8 -66.0 62 -99 SPO 1997 04 26 22 49 39 4.1 -9 672.10 -65.8 -62.8 -66.0 62 -99 SPO 1997 04 26 22 50 40 4.1 -9 672.00 -65.7 -63.0 -66.0 62 -99 SPO 1997 04 26 22 51 40 4.2 -9 672.00 -65.7 -63.0 -66.0 64 -99 SPO 1997 04 26 22 52 40 4.2 -9 672.00 -65.7 -63.0 -65.9 64 -99 SPO 1997 04 26 22 53 40 4.0 -9 672.10 -65.6 -63.0 -65.8 -99 -99 SPO 1997 04 26 22 54 41 4.0 -9 672.10 -65.5 -63.0 -65.8 -99 -99 SPO 1997 04 26 22 55 41 4.0 -9 672.10 -65.4 -63.1 -65.7 -99 -99 SPO 1997 04 26 22 56 41 3.9 -9 672.10 -65.4 -63.2 -65.6 -99 -99 SPO 1997 04 26 22 57 39 3.8 -9 672.10 -65.4 -63.3 -65.6 -99 -99 SPO 1997 04 26 22 58 38 3.9 -9 672.10 -65.3 -63.3 -65.6 63 -99 SPO 1997 04 26 22 59 37 3.9 -9 672.00 -65.3 -63.2 -65.6 62 -99 SPO 1997 04 26 23 00 36 3.8 -9 672.00 -65.2 -63.2 -65.4 62 0 SPO 1997 04 26 23 01 35 3.9 -9 672.00 -65.2 -63.2 -65.4 64 -99 SPO 1997 04 26 23 02 34 3.7 -9 672.00 -65.1 -63.3 -65.4 63 -99 SPO 1997 04 26 23 03 35 3.7 -9 672.00 -65.1 -63.3 -65.3 64 -99 SPO 1997 04 26 23 04 36 3.6 -9 672.00 -65.0 -63.3 -65.3 63 -99 SPO 1997 04 26 23 05 38 3.6 -9 672.00 -65.0 -63.2 -65.3 64 -99 SPO 1997 04 26 23 06 37 3.5 -9 672.00 -65.0 -63.2 -65.2 65 -99 SPO 1997 04 26 23 07 37 3.6 -9 672.00 -64.9 -63.2 -65.2 66 -99 SPO 1997 04 26 23 08 36 3.4 -9 672.00 -64.9 -63.2 -65.2 66 -99 SPO 1997 04 26 23 09 35 3.4 -9 672.00 -64.9 -63.2 -65.2 66 -99 SPO 1997 04 26 23 10 36 3.4 -9 672.00 -64.9 -63.1 -65.1 66 -99 SPO 1997 04 26 23 11 36 3.3 -9 672.00 -64.8 -63.1 -65.1 65 -99 SPO 1997 04 26 23 12 38 3.4 -9 672.00 -64.9 -63.2 -65.1 64 -99 SPO 1997 04 26 23 13 38 3.4 -9 672.00 -64.8 -63.2 -65.1 65 -99 SPO 1997 04 26 23 14 40 3.4 -9 672.00 -64.9 -63.3 -65.1 67 -99 SPO 1997 04 26 23 15 39 3.4 -9 672.00 -65.0 -63.3 -65.2 68 -99 SPO 1997 04 26 23 16 39 3.4 -9 672.00 -65.0 -63.4 -65.2 68 -99 SPO 1997 04 26 23 17 39 3.3 -9 672.00 -65.0 -63.4 -65.2 68 -99 SPO 1997 04 26 23 18 40 3.3 -9 672.00 -65.1 -63.3 -65.2 68 -99 SPO 1997 04 26 23 19 41 3.2 -9 672.00 -65.1 -63.3 -65.2 68 -99 SPO 1997 04 26 23 20 43 3.2 -9 672.10 -65.2 -63.3 -65.3 69 -99 SPO 1997 04 26 23 21 45 3.0 -9 672.10 -65.2 -63.3 -65.3 68 -99 SPO 1997 04 26 23 22 46 3.1 -9 672.10 -65.4 -63.3 -65.4 68 -99 SPO 1997 04 26 23 23 47 3.1 -9 672.10 -65.5 -63.3 -65.5 68 -99 SPO 1997 04 26 23 24 47 2.9 -9 672.10 -65.7 -63.4 -65.6 70 -99 SPO 1997 04 26 23 25 51 2.5 -9 672.10 -66.2 -63.4 -65.7 74 -99 SPO 1997 04 26 23 26 52 2.3 -9 672.10 -66.8 -63.6 -66.0 77 -99 SPO 1997 04 26 23 27 52 2.5 -9 672.10 -67.0 -63.5 -66.2 77 -99 SPO 1997 04 26 23 28 49 2.8 -9 672.10 -67.3 -63.5 -66.3 77 -99 SPO 1997 04 26 23 29 51 2.7 -9 672.10 -67.5 -63.5 -66.5 77 -99 SPO 1997 04 26 23 30 53 2.5 -9 672.10 -67.6 -63.6 -66.6 78 -99 SPO 1997 04 26 23 31 58 2.4 -9 672.10 -67.7 -63.8 -66.7 76 -99 SPO 1997 04 26 23 32 60 2.5 -9 672.10 -67.8 -63.9 -66.8 75 -99 SPO 1997 04 26 23 33 58 2.6 -9 672.10 -67.9 -63.9 -66.9 75 -99 SPO 1997 04 26 23 34 56 2.7 -9 672.10 -67.9 -63.8 -67.0 73 -99 SPO 1997 04 26 23 35 58 2.7 -9 672.10 -68.0 -63.8 -67.1 72 -99 SPO 1997 04 26 23 36 59 2.7 -9 672.10 -68.0 -63.9 -67.1 72 -99 SPO 1997 04 26 23 37 54 2.8 -9 672.10 -68.1 -63.8 -67.2 72 -99 SPO 1997 04 26 23 38 49 2.9 -9 672.00 -68.1 -63.7 -67.3 69 -99 SPO 1997 04 26 23 39 48 3.0 -9 672.00 -68.1 -63.6 -67.4 69 -99 SPO 1997 04 26 23 40 49 3.0 -9 672.00 -68.1 -63.5 -67.4 68 -99 SPO 1997 04 26 23 41 51 2.9 -9 672.00 -68.1 -63.5 -67.5 68 -99 SPO 1997 04 26 23 42 52 2.9 -9 672.00 -68.2 -63.6 -67.6 69 -99 SPO 1997 04 26 23 43 52 3.0 -9 672.00 -68.2 -63.7 -67.6 66 -99 SPO 1997 04 26 23 44 52 3.0 -9 672.00 -68.3 -63.8 -67.6 67 -99 SPO 1997 04 26 23 45 51 3.0 -9 672.00 -68.3 -63.8 -67.7 67 -99 SPO 1997 04 26 23 46 52 3.0 -9 672.00 -68.4 -63.8 -67.8 67 -99 SPO 1997 04 26 23 47 54 3.0 -9 672.00 -68.4 -63.8 -67.8 66 -99 SPO 1997 04 26 23 48 56 3.0 -9 672.00 -68.4 -63.7 -67.8 66 -99 SPO 1997 04 26 23 49 57 3.0 -9 672.00 -68.4 -63.8 -67.9 66 -99 SPO 1997 04 26 23 50 56 2.9 -9 672.00 -68.3 -63.8 -67.9 65 -99 SPO 1997 04 26 23 51 56 3.0 -9 672.00 -68.3 -63.7 -68.0 65 -99 SPO 1997 04 26 23 52 54 3.1 -9 672.00 -68.3 -63.7 -68.0 65 -99 SPO 1997 04 26 23 53 54 3.1 -9 672.00 -68.3 -63.7 -68.0 65 -99 SPO 1997 04 26 23 54 54 3.2 -9 672.00 -68.3 -63.8 -68.0 65 -99 SPO 1997 04 26 23 55 57 3.2 -9 672.00 -68.3 -63.8 -68.0 64 -99 SPO 1997 04 26 23 56 59 3.2 -9 672.10 -68.3 -63.8 -68.1 63 -99 SPO 1997 04 26 23 57 60 3.3 -9 672.10 -68.3 -63.8 -68.1 63 -99 SPO 1997 04 26 23 58 60 3.4 -9 672.10 -68.4 -63.8 -68.1 -99 -99 SPO 1997 04 26 23 59 58 3.5 -9 672.10 -68.4 -64.0 -68.2 -99 -99 SPO 1997 04 27 00 00 57 3.4 -9 672.10 -68.3 -64.1 -68.2 -99 0 SPO 1997 04 27 00 01 57 3.4 -9 672.10 -68.4 -64.0 -68.2 -99 -99 SPO 1997 04 27 00 02 55 3.5 -9 672.10 -68.4 -63.8 -68.2 -99 -99 SPO 1997 04 27 00 03 53 3.5 -9 672.10 -68.3 -63.7 -68.2 -99 -99 SPO 1997 04 27 00 04 51 3.5 -9 672.10 -68.3 -63.7 -68.2 -99 -99 SPO 1997 04 27 00 05 49 3.4 -9 672.10 -68.2 -63.8 -68.2 -99 -99 SPO 1997 04 27 00 06 53 3.3 -9 672.10 -68.2 -63.7 -68.2 -99 -99 SPO 1997 04 27 00 07 54 3.2 -9 672.10 -68.2 -63.7 -68.2 -99 -99 SPO 1997 04 27 00 08 54 3.2 -9 672.10 -68.2 -63.7 -68.2 -99 -99 SPO 1997 04 27 00 09 54 3.2 -9 672.10 -68.2 -63.6 -68.2 -99 -99 SPO 1997 04 27 00 10 53 3.2 -9 672.10 -68.2 -63.5 -68.2 -99 -99 SPO 1997 04 27 00 11 54 3.2 -9 672.10 -68.2 -63.5 -68.2 -99 -99 SPO 1997 04 27 00 12 55 3.2 -9 672.10 -68.2 -63.6 -68.2 -99 -99 SPO 1997 04 27 00 13 56 3.2 -9 672.10 -68.3 -63.7 -68.2 64 -99 SPO 1997 04 27 00 14 56 3.2 -9 672.10 -68.3 -63.7 -68.2 64 -99 SPO 1997 04 27 00 15 55 3.2 -9 672.10 -68.3 -63.6 -68.3 64 -99 SPO 1997 04 27 00 16 55 3.2 -9 672.10 -68.3 -63.5 -68.3 64 -99 SPO 1997 04 27 00 17 57 3.2 -9 672.10 -68.3 -63.5 -68.3 64 -99 SPO 1997 04 27 00 18 61 3.1 -9 672.10 -68.2 -63.5 -68.3 62 -99 SPO 1997 04 27 00 19 64 3.1 -9 672.20 -68.2 -63.6 -68.3 63 -99 SPO 1997 04 27 00 20 63 3.2 -9 672.20 -68.2 -63.6 -68.3 62 -99 SPO 1997 04 27 00 21 63 3.2 -9 672.20 -68.2 -63.6 -68.3 62 -99 SPO 1997 04 27 00 22 63 3.2 -9 672.20 -68.2 -63.6 -68.3 62 -99 SPO 1997 04 27 00 23 64 3.2 -9 672.20 -68.2 -63.6 -68.2 62 -99 SPO 1997 04 27 00 24 67 3.2 -9 672.20 -68.2 -63.7 -68.3 62 -99 SPO 1997 04 27 00 25 68 3.2 -9 672.20 -68.2 -63.8 -68.3 63 -99 SPO 1997 04 27 00 26 69 3.3 -9 672.20 -68.2 -63.9 -68.3 63 -99 SPO 1997 04 27 00 27 68 3.4 -9 672.20 -68.2 -63.8 -68.3 64 -99 SPO 1997 04 27 00 28 66 3.4 -9 672.20 -68.2 -63.7 -68.3 64 -99 SPO 1997 04 27 00 29 65 3.5 -9 672.20 -68.2 -63.6 -68.3 63 -99 SPO 1997 04 27 00 30 69 3.6 -9 672.20 -68.2 -63.6 -68.3 62 -99 SPO 1997 04 27 00 31 70 3.6 -9 672.20 -68.2 -63.7 -68.2 62 -99 SPO 1997 04 27 00 32 71 3.6 -9 672.20 -68.1 -63.7 -68.2 61 -99 SPO 1997 04 27 00 33 70 3.7 -9 672.20 -68.0 -63.7 -68.2 62 -99 SPO 1997 04 27 00 34 68 3.7 -9 672.20 -68.0 -63.6 -68.2 62 -99 SPO 1997 04 27 00 35 67 3.7 -9 672.20 -68.0 -63.6 -68.2 63 -99 SPO 1997 04 27 00 36 68 3.7 -9 672.30 -68.0 -63.5 -68.1 63 -99 SPO 1997 04 27 00 37 67 3.7 -9 672.30 -67.9 -63.5 -68.1 62 -99 SPO 1997 04 27 00 38 67 3.6 -9 672.30 -67.9 -63.5 -68.1 62 -99 SPO 1997 04 27 00 39 65 3.6 -9 672.30 -67.9 -63.5 -68.1 63 -99 SPO 1997 04 27 00 40 64 3.7 -9 672.30 -67.9 -63.6 -68.1 63 -99 SPO 1997 04 27 00 41 62 3.8 -9 672.30 -67.9 -63.5 -68.1 63 -99 SPO 1997 04 27 00 42 61 3.8 -9 672.30 -67.9 -63.4 -68.0 63 -99 SPO 1997 04 27 00 43 62 3.7 -9 672.30 -67.9 -63.4 -68.0 63 -99 SPO 1997 04 27 00 44 62 3.7 -9 672.20 -67.8 -63.4 -68.0 62 -99 SPO 1997 04 27 00 45 61 3.7 -9 672.30 -67.8 -63.4 -68.0 62 -99 SPO 1997 04 27 00 46 59 3.8 -9 672.30 -67.8 -63.3 -68.0 63 -99 SPO 1997 04 27 00 47 58 3.9 -9 672.30 -67.8 -63.2 -68.0 64 -99 SPO 1997 04 27 00 48 58 3.8 -9 672.30 -67.8 -63.2 -68.0 64 -99 SPO 1997 04 27 00 49 57 3.8 -9 672.30 -67.7 -63.2 -67.9 64 -99 SPO 1997 04 27 00 50 58 3.7 -9 672.30 -67.8 -63.2 -67.9 63 -99 SPO 1997 04 27 00 51 57 3.5 -9 672.30 -67.7 -63.2 -67.9 62 -99 SPO 1997 04 27 00 52 56 3.5 -9 672.30 -67.7 -63.2 -67.9 62 -99 SPO 1997 04 27 00 53 58 3.5 -9 672.30 -67.7 -63.2 -67.9 62 -99 SPO 1997 04 27 00 54 60 3.5 -9 672.40 -67.7 -63.0 -67.9 62 -99 SPO 1997 04 27 00 55 60 3.4 -9 672.40 -67.7 -63.2 -67.9 64 -99 SPO 1997 04 27 00 56 62 3.4 -9 672.40 -67.7 -63.4 -67.9 64 -99 SPO 1997 04 27 00 57 61 3.4 -9 672.40 -67.8 -63.5 -67.9 64 -99 SPO 1997 04 27 00 58 60 3.5 -9 672.40 -67.7 -63.6 -67.9 64 -99 SPO 1997 04 27 00 59 57 3.7 -9 672.40 -67.7 -63.5 -67.9 64 -99 SPO 1997 04 27 01 00 58 3.8 -9 672.40 -67.7 -63.6 -67.8 64 0 SPO 1997 04 27 01 01 58 3.8 -9 672.40 -67.7 -63.6 -67.8 64 -99 SPO 1997 04 27 01 02 58 3.6 -9 672.40 -67.6 -63.6 -67.8 64 -99 SPO 1997 04 27 01 03 58 4.0 -9 672.40 -67.6 -63.7 -67.7 64 -99 SPO 1997 04 27 01 04 59 3.9 -9 672.40 -67.5 -63.6 -67.7 63 -99 SPO 1997 04 27 01 05 58 3.9 -9 672.40 -67.4 -63.5 -67.6 62 -99 SPO 1997 04 27 01 06 59 3.9 -9 672.40 -67.4 -63.5 -67.6 62 -99 SPO 1997 04 27 01 07 56 3.8 -9 672.30 -67.4 -63.6 -67.6 62 -99 SPO 1997 04 27 01 08 55 3.9 -9 672.30 -67.4 -63.6 -67.5 62 -99 SPO 1997 04 27 01 09 55 4.0 -9 672.30 -67.3 -63.7 -67.5 62 -99 SPO 1997 04 27 01 10 57 3.9 -9 672.30 -67.3 -63.5 -67.5 63 -99 SPO 1997 04 27 01 11 56 3.9 -9 672.30 -67.2 -63.4 -67.4 64 -99 SPO 1997 04 27 01 12 57 3.8 -9 672.20 -67.2 -63.5 -67.3 64 -99 SPO 1997 04 27 01 13 59 3.9 -9 672.20 -67.2 -63.5 -67.4 65 -99 SPO 1997 04 27 01 14 58 3.8 -9 672.20 -67.2 -63.3 -67.4 65 -99 SPO 1997 04 27 01 15 55 3.4 -9 672.20 -67.2 -63.6 -67.4 65 -99 SPO 1997 04 27 01 16 57 4.1 -9 672.20 -67.2 -63.6 -67.4 64 -99 SPO 1997 04 27 01 17 56 4.1 -9 672.20 -67.1 -63.5 -67.3 63 -99 SPO 1997 04 27 01 18 56 3.8 -9 672.20 -67.1 -63.5 -67.3 63 -99 SPO 1997 04 27 01 19 55 4.0 -9 672.20 -67.0 -63.7 -67.2 62 -99 SPO 1997 04 27 01 20 55 3.8 -9 672.20 -67.0 -63.7 -67.2 62 -99 SPO 1997 04 27 01 21 56 4.0 -9 672.20 -67.0 -63.5 -67.2 63 -99 SPO 1997 04 27 01 22 55 3.9 -9 672.20 -67.0 -63.4 -67.2 63 -99 SPO 1997 04 27 01 23 56 3.7 -9 672.20 -67.0 -63.6 -67.2 63 -99 SPO 1997 04 27 01 24 58 4.2 -9 672.20 -67.0 -63.4 -67.2 64 -99 SPO 1997 04 27 01 25 57 4.0 -9 672.20 -67.0 -63.5 -67.2 64 -99 SPO 1997 04 27 01 26 58 4.1 -9 672.20 -67.0 -63.6 -67.2 64 -99 SPO 1997 04 27 01 27 59 4.3 -9 672.20 -67.0 -63.4 -67.1 64 -99 SPO 1997 04 27 01 28 59 3.9 -9 672.20 -66.9 -63.6 -67.1 63 -99 SPO 1997 04 27 01 29 61 4.0 -9 672.20 -66.9 -63.6 -67.1 63 -99 SPO 1997 04 27 01 30 61 4.1 -9 672.20 -67.0 -63.4 -67.1 64 -99 SPO 1997 04 27 01 31 60 4.1 -9 672.20 -67.0 -63.4 -67.1 64 -99 SPO 1997 04 27 01 32 59 4.0 -9 672.20 -67.0 -63.5 -67.1 65 -99 SPO 1997 04 27 01 33 60 4.1 -9 672.20 -67.0 -63.4 -67.1 65 -99 SPO 1997 04 27 01 34 58 4.2 -9 672.20 -67.0 -63.4 -67.1 65 -99 SPO 1997 04 27 01 35 60 4.3 -9 672.20 -67.0 -63.6 -67.1 65 -99 SPO 1997 04 27 01 36 58 4.0 -9 672.20 -67.0 -63.7 -67.1 65 -99 SPO 1997 04 27 01 37 58 4.3 -9 672.20 -67.0 -63.5 -67.1 65 -99 SPO 1997 04 27 01 38 57 4.1 -9 672.20 -67.0 -63.8 -67.1 64 -99 SPO 1997 04 27 01 39 57 4.1 -9 672.20 -67.0 -63.8 -67.1 64 -99 SPO 1997 04 27 01 40 56 4.0 -9 672.20 -66.9 -64.1 -67.1 64 -99 SPO 1997 04 27 01 41 54 4.3 -9 672.20 -66.9 -64.1 -67.0 63 -99 SPO 1997 04 27 01 42 53 4.2 -9 672.20 -66.9 -64.3 -67.0 64 -99 SPO 1997 04 27 01 43 53 4.0 -9 672.20 -66.8 -64.2 -67.0 63 -99 SPO 1997 04 27 01 44 53 4.0 -9 672.20 -66.8 -64.2 -67.0 65 -99 SPO 1997 04 27 01 45 53 3.9 -9 672.20 -66.8 -64.2 -67.0 65 -99 SPO 1997 04 27 01 46 53 3.9 -9 672.20 -66.9 -64.2 -67.0 66 -99 SPO 1997 04 27 01 47 53 4.1 -9 672.20 -66.9 -64.2 -67.0 66 -99 SPO 1997 04 27 01 48 52 4.1 -9 672.10 -66.9 -64.4 -67.0 65 -99 SPO 1997 04 27 01 49 51 4.1 -9 672.20 -66.9 -64.4 -67.0 65 -99 SPO 1997 04 27 01 50 52 4.2 -9 672.20 -66.9 -64.4 -67.0 65 -99 SPO 1997 04 27 01 51 52 4.1 -9 672.20 -66.8 -64.4 -66.9 63 -99 SPO 1997 04 27 01 52 51 4.2 -9 672.20 -66.7 -64.3 -66.9 62 -99 SPO 1997 04 27 01 53 53 4.1 -9 672.20 -66.7 -64.4 -66.9 62 -99 SPO 1997 04 27 01 54 54 4.0 -9 672.20 -66.7 -64.4 -66.9 64 -99 SPO 1997 04 27 01 55 54 4.0 -9 672.20 -66.7 -64.4 -66.8 65 -99 SPO 1997 04 27 01 56 54 3.9 -9 672.20 -66.7 -64.5 -66.8 65 -99 SPO 1997 04 27 01 57 53 3.9 -9 672.20 -66.6 -64.6 -66.8 64 -99 SPO 1997 04 27 01 58 52 3.9 -9 672.20 -66.5 -64.5 -66.7 64 -99 SPO 1997 04 27 01 59 51 3.8 -9 672.20 -66.5 -64.4 -66.7 64 -99 SPO 1997 04 27 02 00 53 4.0 -9 672.20 -66.5 -64.2 -66.6 64 0 SPO 1997 04 27 02 01 52 3.8 -9 672.20 -66.4 -64.3 -66.6 63 -99 SPO 1997 04 27 02 02 52 4.0 -9 672.20 -66.4 -64.5 -66.6 62 -99 SPO 1997 04 27 02 03 50 4.0 -9 672.10 -66.4 -64.4 -66.6 62 -99 SPO 1997 04 27 02 04 49 4.0 -9 672.10 -66.5 -64.5 -66.6 63 -99 SPO 1997 04 27 02 05 49 4.0 -9 672.10 -66.5 -64.5 -66.7 64 -99 SPO 1997 04 27 02 06 48 3.9 -9 672.10 -66.5 -64.5 -66.7 64 -99 SPO 1997 04 27 02 07 48 4.0 -9 672.10 -66.6 -64.3 -66.7 66 -99 SPO 1997 04 27 02 08 48 4.0 -9 672.10 -66.6 -64.3 -66.7 66 -99 SPO 1997 04 27 02 09 47 4.0 -9 672.10 -66.6 -64.3 -66.7 67 -99 SPO 1997 04 27 02 10 46 4.0 -9 672.10 -66.6 -64.3 -66.7 67 -99 SPO 1997 04 27 02 11 46 4.0 -9 672.10 -66.5 -64.3 -66.6 66 -99 SPO 1997 04 27 02 12 45 4.0 -9 672.00 -66.5 -64.2 -66.6 66 -99 SPO 1997 04 27 02 13 46 4.0 -9 672.00 -66.4 -64.1 -66.6 64 -99 SPO 1997 04 27 02 14 45 4.1 -9 672.00 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 02 15 46 4.1 -9 672.00 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 02 16 47 4.2 -9 672.00 -66.3 -64.0 -66.5 65 -99 SPO 1997 04 27 02 17 47 4.2 -9 672.00 -66.3 -64.0 -66.4 65 -99 SPO 1997 04 27 02 18 47 4.2 -9 672.00 -66.3 -64.0 -66.5 65 -99 SPO 1997 04 27 02 19 47 4.1 -9 672.00 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 02 20 47 4.0 -9 672.00 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 02 21 47 4.0 -9 672.00 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 02 22 46 3.9 -9 672.00 -66.5 -64.0 -66.6 67 -99 SPO 1997 04 27 02 23 46 4.0 -9 672.00 -66.5 -64.0 -66.6 67 -99 SPO 1997 04 27 02 24 46 3.8 -9 672.00 -66.5 -63.9 -66.6 66 -99 SPO 1997 04 27 02 25 47 3.8 -9 672.00 -66.5 -63.9 -66.6 66 -99 SPO 1997 04 27 02 26 47 3.7 -9 672.00 -66.6 -63.9 -66.6 66 -99 SPO 1997 04 27 02 27 47 3.7 -9 672.00 -66.6 -63.9 -66.6 66 -99 SPO 1997 04 27 02 28 47 3.5 -9 672.00 -66.6 -64.0 -66.6 65 -99 SPO 1997 04 27 02 29 48 3.6 -9 672.10 -66.6 -64.0 -66.6 65 -99 SPO 1997 04 27 02 30 49 3.6 -9 672.10 -66.6 -64.1 -66.6 65 -99 SPO 1997 04 27 02 31 49 3.6 -9 672.10 -66.6 -64.2 -66.6 65 -99 SPO 1997 04 27 02 32 49 3.6 -9 672.10 -66.6 -64.3 -66.6 66 -99 SPO 1997 04 27 02 33 49 3.6 -9 672.10 -66.6 -64.3 -66.6 66 -99 SPO 1997 04 27 02 34 50 3.6 -9 672.10 -66.6 -64.2 -66.6 66 -99 SPO 1997 04 27 02 35 51 3.7 -9 672.10 -66.6 -64.2 -66.6 66 -99 SPO 1997 04 27 02 36 52 3.7 -9 672.10 -66.6 -64.3 -66.6 66 -99 SPO 1997 04 27 02 37 53 3.8 -9 672.10 -66.5 -64.4 -66.6 65 -99 SPO 1997 04 27 02 38 54 3.9 -9 672.10 -66.5 -64.4 -66.6 65 -99 SPO 1997 04 27 02 39 57 3.8 -9 672.10 -66.6 -64.4 -66.6 65 -99 SPO 1997 04 27 02 40 58 3.9 -9 672.20 -66.6 -64.5 -66.7 65 -99 SPO 1997 04 27 02 41 58 3.9 -9 672.20 -66.6 -64.6 -66.7 65 -99 SPO 1997 04 27 02 42 58 3.9 -9 672.20 -66.6 -64.6 -66.7 65 -99 SPO 1997 04 27 02 43 57 3.9 -9 672.10 -66.7 -64.5 -66.7 65 -99 SPO 1997 04 27 02 44 57 3.9 -9 672.20 -66.7 -64.6 -66.7 66 -99 SPO 1997 04 27 02 45 58 3.8 -9 672.20 -66.7 -64.6 -66.8 66 -99 SPO 1997 04 27 02 46 59 3.7 -9 672.20 -66.8 -64.6 -66.8 66 -99 SPO 1997 04 27 02 47 58 3.7 -9 672.20 -66.8 -64.6 -66.8 66 -99 SPO 1997 04 27 02 48 57 3.7 -9 672.20 -66.8 -64.8 -66.9 66 -99 SPO 1997 04 27 02 49 58 3.7 -9 672.20 -66.8 -64.7 -66.9 65 -99 SPO 1997 04 27 02 50 59 3.6 -9 672.20 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 02 51 58 3.5 -9 672.20 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 02 52 57 3.5 -9 672.20 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 02 53 56 3.4 -9 672.20 -67.0 -64.8 -67.0 67 -99 SPO 1997 04 27 02 54 58 3.4 -9 672.20 -66.9 -64.7 -66.9 66 -99 SPO 1997 04 27 02 55 58 3.4 -9 672.20 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 02 56 57 3.5 -9 672.20 -66.9 -64.7 -66.9 66 -99 SPO 1997 04 27 02 57 56 3.5 -9 672.20 -66.9 -64.6 -66.9 67 -99 SPO 1997 04 27 02 58 54 3.4 -9 672.20 -66.9 -64.6 -66.9 66 -99 SPO 1997 04 27 02 59 54 3.4 -9 672.20 -66.9 -64.6 -66.9 66 -99 SPO 1997 04 27 03 00 54 3.4 -9 672.20 -66.9 -64.6 -66.9 66 0 SPO 1997 04 27 03 01 55 3.4 -9 672.20 -66.9 -64.6 -66.9 65 -99 SPO 1997 04 27 03 02 55 3.3 -9 672.20 -66.9 -64.6 -67.0 65 -99 SPO 1997 04 27 03 03 54 3.4 -9 672.20 -66.9 -64.6 -67.0 64 -99 SPO 1997 04 27 03 04 53 3.4 -9 672.20 -66.9 -64.6 -67.0 65 -99 SPO 1997 04 27 03 05 52 3.3 -9 672.20 -66.9 -64.5 -67.0 65 -99 SPO 1997 04 27 03 06 54 3.3 -9 672.20 -67.0 -64.5 -67.0 66 -99 SPO 1997 04 27 03 07 55 3.3 -9 672.20 -67.0 -64.6 -67.0 66 -99 SPO 1997 04 27 03 08 56 3.3 -9 672.20 -67.0 -64.7 -67.0 67 -99 SPO 1997 04 27 03 09 56 3.3 -9 672.20 -67.0 -64.6 -67.0 67 -99 SPO 1997 04 27 03 10 56 3.2 -9 672.20 -67.0 -64.6 -67.0 66 -99 SPO 1997 04 27 03 11 56 3.3 -9 672.20 -67.0 -64.4 -67.0 65 -99 SPO 1997 04 27 03 12 55 3.4 -9 672.20 -66.9 -64.4 -67.0 65 -99 SPO 1997 04 27 03 13 54 3.4 -9 672.20 -66.9 -64.4 -67.0 65 -99 SPO 1997 04 27 03 14 53 3.5 -9 672.20 -66.9 -64.4 -67.0 64 -99 SPO 1997 04 27 03 15 54 3.6 -9 672.20 -66.9 -64.4 -66.9 64 -99 SPO 1997 04 27 03 16 55 3.6 -9 672.30 -66.8 -64.6 -66.9 65 -99 SPO 1997 04 27 03 17 56 3.6 -9 672.20 -66.8 -64.7 -66.9 65 -99 SPO 1997 04 27 03 18 57 3.5 -9 672.30 -66.8 -64.8 -66.9 65 -99 SPO 1997 04 27 03 19 57 3.5 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 20 57 3.5 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 21 56 3.6 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 22 54 3.5 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 23 53 3.5 -9 672.30 -66.8 -64.8 -66.9 65 -99 SPO 1997 04 27 03 24 52 3.4 -9 672.30 -66.8 -64.8 -66.9 65 -99 SPO 1997 04 27 03 25 52 3.3 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 26 53 3.4 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 27 52 3.4 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 28 50 3.4 -9 672.30 -66.8 -64.8 -66.9 65 -99 SPO 1997 04 27 03 29 51 3.5 -9 672.30 -66.8 -64.9 -66.9 65 -99 SPO 1997 04 27 03 30 51 3.5 -9 672.30 -66.7 -65.0 -66.8 65 -99 SPO 1997 04 27 03 31 51 3.5 -9 672.30 -66.7 -65.0 -66.8 65 -99 SPO 1997 04 27 03 32 51 3.4 -9 672.30 -66.6 -64.9 -66.8 64 -99 SPO 1997 04 27 03 33 49 3.3 -9 672.30 -66.6 -64.8 -66.7 64 -99 SPO 1997 04 27 03 34 51 3.1 -9 672.30 -66.6 -64.9 -66.7 64 -99 SPO 1997 04 27 03 35 53 3.1 -9 672.30 -66.6 -64.8 -66.7 64 -99 SPO 1997 04 27 03 36 52 3.2 -9 672.30 -66.6 -64.8 -66.7 64 -99 SPO 1997 04 27 03 37 49 3.2 -9 672.30 -66.6 -64.9 -66.7 64 -99 SPO 1997 04 27 03 38 48 3.2 -9 672.30 -66.6 -64.9 -66.7 64 -99 SPO 1997 04 27 03 39 48 3.0 -9 672.30 -66.6 -64.9 -66.7 65 -99 SPO 1997 04 27 03 40 51 2.9 -9 672.40 -66.6 -65.0 -66.7 65 -99 SPO 1997 04 27 03 41 51 2.9 -9 672.40 -66.5 -65.0 -66.7 64 -99 SPO 1997 04 27 03 42 50 2.8 -9 672.40 -66.6 -64.8 -66.7 65 -99 SPO 1997 04 27 03 43 49 2.7 -9 672.40 -66.6 -64.8 -66.7 65 -99 SPO 1997 04 27 03 44 50 2.6 -9 672.40 -66.6 -64.7 -66.7 65 -99 SPO 1997 04 27 03 45 54 2.4 -9 672.40 -66.6 -64.8 -66.7 64 -99 SPO 1997 04 27 03 46 58 2.5 -9 672.40 -66.7 -65.0 -66.8 65 -99 SPO 1997 04 27 03 47 58 2.4 -9 672.40 -66.7 -65.0 -66.8 65 -99 SPO 1997 04 27 03 48 56 2.6 -9 672.40 -66.8 -64.9 -66.8 65 -99 SPO 1997 04 27 03 49 56 2.7 -9 672.50 -66.8 -64.8 -66.8 65 -99 SPO 1997 04 27 03 50 59 2.7 -9 672.40 -66.8 -64.7 -66.8 65 -99 SPO 1997 04 27 03 51 62 2.7 -9 672.40 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 03 52 63 2.6 -9 672.50 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 03 53 61 2.7 -9 672.50 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 03 54 60 2.7 -9 672.50 -66.9 -64.8 -66.9 66 -99 SPO 1997 04 27 03 55 62 2.6 -9 672.50 -66.9 -64.7 -66.9 66 -99 SPO 1997 04 27 03 56 64 2.6 -9 672.50 -67.0 -64.7 -66.9 67 -99 SPO 1997 04 27 03 57 63 2.5 -9 672.50 -67.0 -64.7 -66.9 66 -99 SPO 1997 04 27 03 58 59 2.5 -9 672.50 -67.0 -64.6 -66.9 65 -99 SPO 1997 04 27 03 59 53 2.6 -9 672.50 -66.9 -64.6 -66.9 64 -99 SPO 1997 04 27 04 00 51 2.7 -9 672.50 -67.0 -64.5 -66.9 65 0 SPO 1997 04 27 04 01 49 2.7 -9 672.40 -67.0 -64.5 -66.9 65 -99 SPO 1997 04 27 04 02 47 2.7 -9 672.40 -67.0 -64.4 -67.0 66 -99 SPO 1997 04 27 04 03 45 2.8 -9 672.40 -67.0 -64.4 -67.0 66 -99 SPO 1997 04 27 04 04 42 3.0 -9 672.40 -67.0 -64.4 -66.9 66 -99 SPO 1997 04 27 04 05 40 3.0 -9 672.40 -66.9 -64.3 -67.0 65 -99 SPO 1997 04 27 04 06 39 3.0 -9 672.40 -66.9 -64.3 -66.9 65 -99 SPO 1997 04 27 04 07 38 3.0 -9 672.40 -66.8 -64.2 -66.9 65 -99 SPO 1997 04 27 04 08 37 3.1 -9 672.40 -66.8 -64.2 -66.8 65 -99 SPO 1997 04 27 04 09 38 3.0 -9 672.40 -66.7 -64.1 -66.8 64 -99 SPO 1997 04 27 04 10 41 2.9 -9 672.40 -66.6 -64.0 -66.7 63 -99 SPO 1997 04 27 04 11 45 2.9 -9 672.40 -66.5 -64.0 -66.7 63 -99 SPO 1997 04 27 04 12 49 2.8 -9 672.40 -66.5 -63.9 -66.7 63 -99 SPO 1997 04 27 04 13 50 2.8 -9 672.40 -66.6 -63.9 -66.7 64 -99 SPO 1997 04 27 04 14 47 2.8 -9 672.40 -66.6 -63.9 -66.7 65 -99 SPO 1997 04 27 04 15 45 2.8 -9 672.40 -66.7 -63.9 -66.7 65 -99 SPO 1997 04 27 04 16 43 2.7 -9 672.40 -66.8 -63.9 -66.8 67 -99 SPO 1997 04 27 04 17 44 2.6 -9 672.40 -66.8 -64.0 -66.8 67 -99 SPO 1997 04 27 04 18 45 2.5 -9 672.40 -66.8 -64.0 -66.8 66 -99 SPO 1997 04 27 04 19 44 2.5 -9 672.40 -66.9 -64.0 -66.9 67 -99 SPO 1997 04 27 04 20 43 2.6 -9 672.40 -66.9 -64.0 -66.9 66 -99 SPO 1997 04 27 04 21 41 2.6 -9 672.40 -66.9 -64.0 -66.9 66 -99 SPO 1997 04 27 04 22 40 2.5 -9 672.40 -66.9 -63.9 -66.8 66 -99 SPO 1997 04 27 04 23 41 2.5 -9 672.40 -66.8 -64.0 -66.8 65 -99 SPO 1997 04 27 04 24 41 2.4 -9 672.40 -66.8 -64.0 -66.8 65 -99 SPO 1997 04 27 04 25 41 2.3 -9 672.40 -66.8 -64.0 -66.8 65 -99 SPO 1997 04 27 04 26 40 2.3 -9 672.40 -66.7 -63.9 -66.7 65 -99 SPO 1997 04 27 04 27 41 2.4 -9 672.40 -66.7 -63.9 -66.7 65 -99 SPO 1997 04 27 04 28 43 2.2 -9 672.40 -66.7 -64.0 -66.7 65 -99 SPO 1997 04 27 04 29 44 2.2 -9 672.40 -66.6 -64.1 -66.7 65 -99 SPO 1997 04 27 04 30 47 2.2 -9 672.40 -66.6 -64.2 -66.7 65 -99 SPO 1997 04 27 04 31 50 2.1 -9 672.40 -66.6 -64.3 -66.7 65 -99 SPO 1997 04 27 04 32 53 2.0 -9 672.40 -66.7 -64.3 -66.7 65 -99 SPO 1997 04 27 04 33 57 2.0 -9 672.40 -66.8 -64.3 -66.7 66 -99 SPO 1997 04 27 04 34 59 2.0 -9 672.50 -66.8 -64.2 -66.8 66 -99 SPO 1997 04 27 04 35 61 2.1 -9 672.50 -66.9 -64.2 -66.8 66 -99 SPO 1997 04 27 04 36 62 2.0 -9 672.50 -66.9 -64.1 -66.8 66 -99 SPO 1997 04 27 04 37 65 2.0 -9 672.50 -67.0 -64.0 -66.8 67 -99 SPO 1997 04 27 04 38 67 2.0 -9 672.50 -67.0 -64.0 -66.9 67 -99 SPO 1997 04 27 04 39 66 2.1 -9 672.50 -67.0 -64.0 -66.9 68 -99 SPO 1997 04 27 04 40 66 2.1 -9 672.50 -67.0 -64.0 -66.9 67 -99 SPO 1997 04 27 04 41 61 2.3 -9 672.50 -67.1 -64.1 -66.9 68 -99 SPO 1997 04 27 04 42 61 2.4 -9 672.50 -67.1 -64.1 -66.9 67 -99 SPO 1997 04 27 04 43 60 2.4 -9 672.50 -67.1 -64.1 -66.9 67 -99 SPO 1997 04 27 04 44 62 2.4 -9 672.50 -67.0 -64.2 -66.9 65 -99 SPO 1997 04 27 04 45 65 2.5 -9 672.50 -67.0 -64.2 -66.9 65 -99 SPO 1997 04 27 04 46 66 2.6 -9 672.50 -67.0 -64.2 -66.9 65 -99 SPO 1997 04 27 04 47 63 2.7 -9 672.60 -66.9 -64.2 -66.9 65 -99 SPO 1997 04 27 04 48 63 2.8 -9 672.60 -66.8 -64.2 -66.9 65 -99 SPO 1997 04 27 04 49 63 2.8 -9 672.60 -66.8 -64.1 -66.9 65 -99 SPO 1997 04 27 04 50 62 2.9 -9 672.60 -66.7 -64.0 -66.8 65 -99 SPO 1997 04 27 04 51 61 2.9 -9 672.60 -66.7 -64.0 -66.8 65 -99 SPO 1997 04 27 04 52 60 2.9 -9 672.60 -66.6 -63.8 -66.8 66 -99 SPO 1997 04 27 04 53 61 2.9 -9 672.60 -66.6 -63.8 -66.8 66 -99 SPO 1997 04 27 04 54 61 2.9 -9 672.60 -66.6 -63.8 -66.7 66 -99 SPO 1997 04 27 04 55 66 2.8 -9 672.70 -66.5 -63.8 -66.7 65 -99 SPO 1997 04 27 04 56 65 2.8 -9 672.70 -66.5 -63.9 -66.7 65 -99 SPO 1997 04 27 04 57 63 2.8 -9 672.70 -66.5 -63.9 -66.7 65 -99 SPO 1997 04 27 04 58 60 2.9 -9 672.70 -66.5 -63.9 -66.7 66 -99 SPO 1997 04 27 04 59 57 3.0 -9 672.70 -66.5 -63.8 -66.6 66 -99 SPO 1997 04 27 05 00 57 3.1 -9 672.70 -66.4 -63.8 -66.6 66 0 SPO 1997 04 27 05 01 58 2.9 -9 672.70 -66.4 -63.8 -66.6 66 -99 SPO 1997 04 27 05 02 59 3.0 -9 672.70 -66.4 -63.8 -66.6 66 -99 SPO 1997 04 27 05 03 60 2.9 -9 672.70 -66.3 -63.9 -66.5 66 -99 SPO 1997 04 27 05 04 60 2.9 -9 672.70 -66.3 -63.9 -66.5 66 -99 SPO 1997 04 27 05 05 59 2.9 -9 672.70 -66.3 -63.9 -66.5 66 -99 SPO 1997 04 27 05 06 60 2.9 -9 672.70 -66.3 -63.8 -66.5 66 -99 SPO 1997 04 27 05 07 58 2.8 -9 672.70 -66.2 -63.8 -66.4 65 -99 SPO 1997 04 27 05 08 59 2.8 -9 672.70 -66.2 -63.8 -66.4 66 -99 SPO 1997 04 27 05 09 59 2.9 -9 672.70 -66.2 -63.8 -66.4 66 -99 SPO 1997 04 27 05 10 59 3.0 -9 672.70 -66.2 -63.8 -66.4 66 -99 SPO 1997 04 27 05 11 59 3.2 -9 672.70 -66.1 -63.8 -66.3 65 -99 SPO 1997 04 27 05 12 59 3.2 -9 672.70 -66.1 -63.8 -66.3 66 -99 SPO 1997 04 27 05 13 58 3.0 -9 672.70 -66.1 -64.0 -66.3 67 -99 SPO 1997 04 27 05 14 56 3.1 -9 672.70 -66.0 -64.0 -66.3 67 -99 SPO 1997 04 27 05 15 55 3.1 -9 672.70 -66.0 -63.9 -66.2 67 -99 SPO 1997 04 27 05 16 52 2.9 -9 672.70 -66.0 -63.9 -66.2 67 -99 SPO 1997 04 27 05 17 54 3.0 -9 672.70 -66.0 -63.9 -66.2 67 -99 SPO 1997 04 27 05 18 56 2.7 -9 672.70 -66.0 -63.9 -66.1 67 -99 SPO 1997 04 27 05 19 57 2.6 -9 672.70 -65.9 -64.0 -66.1 66 -99 SPO 1997 04 27 05 20 59 2.6 -9 672.80 -65.9 -64.0 -66.1 66 -99 SPO 1997 04 27 05 21 62 2.5 -9 672.80 -65.8 -64.1 -66.1 65 -99 SPO 1997 04 27 05 22 63 2.6 -9 672.80 -65.8 -64.2 -66.1 66 -99 SPO 1997 04 27 05 23 62 2.6 -9 672.80 -65.8 -64.2 -66.0 66 -99 SPO 1997 04 27 05 24 60 2.6 -9 672.80 -65.8 -64.1 -66.0 67 -99 SPO 1997 04 27 05 25 60 2.6 -9 672.80 -65.8 -64.0 -66.0 67 -99 SPO 1997 04 27 05 26 61 2.6 -9 672.80 -65.8 -64.0 -66.0 -99 -99 SPO 1997 04 27 05 27 63 2.6 -9 672.80 -65.8 -64.0 -66.0 -99 -99 SPO 1997 04 27 05 28 63 2.6 -9 672.80 -65.8 -64.2 -66.0 -99 -99 SPO 1997 04 27 05 29 62 2.4 -9 672.80 -65.8 -64.1 -66.0 -99 -99 SPO 1997 04 27 05 30 62 2.5 -9 672.80 -65.8 -64.1 -65.9 -99 -99 SPO 1997 04 27 05 31 62 2.5 -9 672.80 -65.8 -64.0 -65.9 67 -99 SPO 1997 04 27 05 32 61 2.5 -9 672.80 -65.7 -63.9 -65.9 66 -99 SPO 1997 04 27 05 33 62 2.6 -9 672.80 -65.7 -63.9 -65.9 67 -99 SPO 1997 04 27 05 34 61 2.5 -9 672.80 -65.7 -63.8 -65.9 67 -99 SPO 1997 04 27 05 35 61 2.6 -9 672.80 -65.7 -63.9 -65.9 68 -99 SPO 1997 04 27 05 36 62 2.6 -9 672.80 -65.7 -63.9 -65.9 68 -99 SPO 1997 04 27 05 37 64 2.5 -9 672.80 -65.7 -63.9 -65.8 68 -99 SPO 1997 04 27 05 38 66 2.5 -9 672.80 -65.7 -63.9 -65.8 69 -99 SPO 1997 04 27 05 39 69 2.4 -9 672.80 -65.7 -64.0 -65.8 68 -99 SPO 1997 04 27 05 40 69 2.3 -9 672.80 -65.7 -64.1 -65.8 68 -99 SPO 1997 04 27 05 41 68 2.4 -9 672.80 -65.6 -64.0 -65.8 66 -99 SPO 1997 04 27 05 42 70 2.4 -9 672.90 -65.6 -64.0 -65.8 67 -99 SPO 1997 04 27 05 43 69 2.3 -9 672.90 -65.6 -64.0 -65.8 67 -99 SPO 1997 04 27 05 44 71 2.2 -9 672.90 -65.6 -64.0 -65.8 67 -99 SPO 1997 04 27 05 45 72 2.2 -9 672.90 -65.6 -64.0 -65.8 68 -99 SPO 1997 04 27 05 46 72 2.3 -9 672.90 -65.6 -64.0 -65.8 68 -99 SPO 1997 04 27 05 47 72 2.4 -9 672.90 -65.6 -64.0 -65.7 68 -99 SPO 1997 04 27 05 48 72 2.5 -9 672.90 -65.6 -63.9 -65.7 68 -99 SPO 1997 04 27 05 49 71 2.6 -9 672.90 -65.6 -63.9 -65.7 68 -99 SPO 1997 04 27 05 50 72 2.7 -9 672.90 -65.6 -63.8 -65.7 68 -99 SPO 1997 04 27 05 51 72 2.8 -9 672.90 -65.6 -63.8 -65.7 68 -99 SPO 1997 04 27 05 52 73 2.7 -9 672.90 -65.5 -63.8 -65.7 67 -99 SPO 1997 04 27 05 53 73 2.6 -9 672.90 -65.5 -63.8 -65.7 67 -99 SPO 1997 04 27 05 54 73 2.7 -9 672.90 -65.5 -63.9 -65.7 67 -99 SPO 1997 04 27 05 55 76 2.4 -9 672.90 -65.6 -63.9 -65.7 67 -99 SPO 1997 04 27 05 56 76 2.6 -9 672.90 -65.5 -63.9 -65.7 67 -99 SPO 1997 04 27 05 57 75 2.6 -9 672.90 -65.6 -63.9 -65.6 68 -99 SPO 1997 04 27 05 58 74 2.7 -9 672.90 -65.6 -63.9 -65.7 68 -99 SPO 1997 04 27 05 59 73 2.8 -9 672.90 -65.6 -63.9 -65.7 69 -99 SPO 1997 04 27 06 00 71 2.9 -9 672.90 -65.5 -63.9 -65.7 68 0 SPO 1997 04 27 06 01 73 2.9 -9 672.90 -65.6 -63.8 -65.7 69 -99 SPO 1997 04 27 06 02 71 3.0 -9 672.90 -65.6 -63.8 -65.6 69 -99 SPO 1997 04 27 06 03 69 2.9 -9 672.90 -65.5 -63.8 -65.6 67 -99 SPO 1997 04 27 06 04 67 2.9 -9 672.90 -65.5 -63.8 -65.6 67 -99 SPO 1997 04 27 06 05 68 2.9 -9 672.90 -65.5 -63.7 -65.6 67 -99 SPO 1997 04 27 06 06 68 2.8 -9 672.90 -65.5 -63.7 -65.6 67 -99 SPO 1997 04 27 06 07 69 2.8 -9 672.90 -65.5 -63.7 -65.6 67 -99 SPO 1997 04 27 06 08 69 2.8 -9 672.90 -65.5 -63.7 -65.6 67 -99 SPO 1997 04 27 06 09 67 2.8 -9 672.90 -65.5 -63.9 -65.6 67 -99 SPO 1997 04 27 06 10 65 2.8 -9 672.90 -65.5 -63.9 -65.6 67 -99 SPO 1997 04 27 06 11 63 2.7 -9 672.90 -65.4 -63.8 -65.6 67 -99 SPO 1997 04 27 06 12 61 2.8 -9 672.90 -65.4 -63.8 -65.5 67 -99 SPO 1997 04 27 06 13 59 2.9 -9 672.90 -65.4 -63.8 -65.5 68 -99 SPO 1997 04 27 06 14 61 2.9 -9 672.90 -65.4 -63.8 -65.5 67 -99 SPO 1997 04 27 06 15 61 2.9 -9 672.90 -65.3 -63.8 -65.5 66 -99 SPO 1997 04 27 06 16 61 2.9 -9 672.90 -65.3 -63.9 -65.5 66 -99 SPO 1997 04 27 06 17 60 2.9 -9 672.90 -65.3 -63.9 -65.4 66 -99 SPO 1997 04 27 06 18 60 2.9 -9 672.90 -65.3 -63.9 -65.4 67 -99 SPO 1997 04 27 06 19 60 2.9 -9 672.90 -65.3 -63.9 -65.4 67 -99 SPO 1997 04 27 06 20 60 2.9 -9 672.90 -65.2 -64.0 -65.4 67 -99 SPO 1997 04 27 06 21 59 3.0 -9 672.90 -65.2 -64.0 -65.3 67 -99 SPO 1997 04 27 06 22 58 3.0 -9 672.90 -65.1 -64.0 -65.3 66 -99 SPO 1997 04 27 06 23 57 3.0 -9 672.90 -65.1 -64.0 -65.3 68 -99 SPO 1997 04 27 06 24 58 2.9 -9 672.90 -65.1 -64.0 -65.3 68 -99 SPO 1997 04 27 06 25 58 3.0 -9 672.90 -65.1 -63.9 -65.2 66 -99 SPO 1997 04 27 06 26 58 3.0 -9 672.90 -65.0 -64.0 -65.2 65 -99 SPO 1997 04 27 06 27 58 3.1 -9 673.00 -65.0 -64.0 -65.2 67 -99 SPO 1997 04 27 06 28 58 3.1 -9 672.90 -65.0 -64.0 -65.2 67 -99 SPO 1997 04 27 06 29 59 3.1 -9 672.90 -65.0 -64.1 -65.2 67 -99 SPO 1997 04 27 06 30 59 3.2 -9 672.90 -65.0 -64.1 -65.1 68 -99 SPO 1997 04 27 06 31 59 3.3 -9 672.90 -64.9 -64.0 -65.1 67 -99 SPO 1997 04 27 06 32 59 3.4 -9 673.00 -64.9 -64.0 -65.1 67 -99 SPO 1997 04 27 06 33 58 3.3 -9 673.00 -64.8 -64.0 -65.0 67 -99 SPO 1997 04 27 06 34 58 3.4 -9 673.00 -64.8 -64.0 -65.0 67 -99 SPO 1997 04 27 06 35 58 3.3 -9 673.00 -64.8 -64.0 -65.0 68 -99 SPO 1997 04 27 06 36 59 3.4 -9 673.00 -64.8 -64.1 -64.9 68 -99 SPO 1997 04 27 06 37 58 3.4 -9 673.00 -64.7 -64.0 -64.9 67 -99 SPO 1997 04 27 06 38 57 3.4 -9 672.90 -64.7 -64.0 -64.9 69 -99 SPO 1997 04 27 06 39 55 3.4 -9 672.90 -64.7 -64.0 -64.9 69 -99 SPO 1997 04 27 06 40 54 3.4 -9 672.90 -64.7 -63.9 -64.9 67 -99 SPO 1997 04 27 06 41 53 3.4 -9 673.00 -64.7 -63.9 -64.9 67 -99 SPO 1997 04 27 06 42 52 3.3 -9 672.90 -64.7 -63.9 -64.9 69 -99 SPO 1997 04 27 06 43 52 3.4 -9 672.90 -64.7 -63.9 -64.8 69 -99 SPO 1997 04 27 06 44 50 3.4 -9 672.90 -64.6 -64.0 -64.8 69 -99 SPO 1997 04 27 06 45 49 3.2 -9 672.90 -64.6 -64.0 -64.8 69 -99 SPO 1997 04 27 06 46 51 3.1 -9 673.00 -64.6 -64.0 -64.8 69 -99 SPO 1997 04 27 06 47 50 3.1 -9 673.00 -64.6 -63.9 -64.8 69 -99 SPO 1997 04 27 06 48 51 3.0 -9 673.00 -64.6 -63.9 -64.8 69 -99 SPO 1997 04 27 06 49 53 2.9 -9 673.00 -64.6 -63.9 -64.7 69 -99 SPO 1997 04 27 06 50 51 2.9 -9 673.00 -64.5 -63.9 -64.7 68 -99 SPO 1997 04 27 06 51 51 2.8 -9 673.00 -64.5 -63.8 -64.7 68 -99 SPO 1997 04 27 06 52 51 3.0 -9 673.00 -64.5 -63.8 -64.7 68 -99 SPO 1997 04 27 06 53 51 3.1 -9 673.00 -64.5 -63.7 -64.6 69 -99 SPO 1997 04 27 06 54 51 3.1 -9 673.00 -64.5 -63.6 -64.6 69 -99 SPO 1997 04 27 06 55 51 3.2 -9 672.90 -64.4 -63.6 -64.6 68 -99 SPO 1997 04 27 06 56 50 3.2 -9 672.90 -64.4 -63.7 -64.6 68 -99 SPO 1997 04 27 06 57 49 3.4 -9 672.90 -64.4 -63.6 -64.6 68 -99 SPO 1997 04 27 06 58 48 3.5 -9 672.90 -64.4 -63.6 -64.6 69 -99 SPO 1997 04 27 06 59 47 3.3 -9 672.90 -64.4 -63.6 -64.6 68 -99 SPO 1997 04 27 07 00 48 3.4 -9 672.90 -64.4 -63.5 -64.6 68 0 SPO 1997 04 27 07 01 48 3.4 -9 672.90 -64.4 -63.5 -64.5 69 -99 SPO 1997 04 27 07 02 47 3.5 -9 672.90 -64.4 -63.5 -64.5 69 -99 SPO 1997 04 27 07 03 47 3.6 -9 672.90 -64.4 -63.5 -64.5 68 -99 SPO 1997 04 27 07 04 47 3.6 -9 672.90 -64.3 -63.4 -64.5 67 -99 SPO 1997 04 27 07 05 48 3.6 -9 672.90 -64.3 -63.4 -64.4 68 -99 SPO 1997 04 27 07 06 47 3.6 -9 672.90 -64.2 -63.4 -64.4 67 -99 SPO 1997 04 27 07 07 47 3.5 -9 672.90 -64.2 -63.3 -64.4 69 -99 SPO 1997 04 27 07 08 48 3.5 -9 672.90 -64.2 -63.4 -64.4 70 -99 SPO 1997 04 27 07 09 48 3.5 -9 673.00 -64.2 -63.3 -64.4 70 -99 SPO 1997 04 27 07 10 48 3.2 -9 673.00 -64.2 -63.3 -64.4 70 -99 SPO 1997 04 27 07 11 47 3.1 -9 673.00 -64.2 -63.3 -64.4 69 -99 SPO 1997 04 27 07 12 46 3.1 -9 673.00 -64.2 -63.4 -64.3 69 -99 SPO 1997 04 27 07 13 43 3.2 -9 673.00 -64.2 -63.4 -64.3 69 -99 SPO 1997 04 27 07 14 41 3.2 -9 673.00 -64.2 -63.3 -64.3 69 -99 SPO 1997 04 27 07 15 42 3.2 -9 673.00 -64.1 -63.2 -64.3 68 -99 SPO 1997 04 27 07 16 41 3.3 -9 673.00 -64.1 -63.2 -64.2 69 -99 SPO 1997 04 27 07 17 42 3.3 -9 673.00 -64.0 -63.2 -64.2 68 -99 SPO 1997 04 27 07 18 41 3.4 -9 673.00 -64.0 -63.2 -64.2 68 -99 SPO 1997 04 27 07 19 39 3.4 -9 673.00 -63.9 -63.1 -64.1 67 -99 SPO 1997 04 27 07 20 37 3.6 -9 673.00 -63.8 -63.1 -64.0 67 -99 SPO 1997 04 27 07 21 37 3.7 -9 673.00 -63.8 -63.0 -64.0 68 -99 SPO 1997 04 27 07 22 36 3.7 -9 673.00 -63.7 -63.0 -63.9 67 -99 SPO 1997 04 27 07 23 35 3.8 -9 673.00 -63.6 -62.8 -63.8 68 -99 SPO 1997 04 27 07 24 34 4.0 -9 673.00 -63.5 -62.8 -63.8 67 -99 SPO 1997 04 27 07 25 33 4.1 -9 673.00 -63.4 -62.7 -63.6 66 -99 SPO 1997 04 27 07 26 35 4.2 -9 673.00 -63.3 -62.7 -63.6 66 -99 SPO 1997 04 27 07 27 35 4.2 -9 673.00 -63.2 -62.7 -63.4 65 -99 SPO 1997 04 27 07 28 37 4.3 -9 673.00 -63.1 -62.7 -63.4 68 -99 SPO 1997 04 27 07 29 38 4.2 -9 673.00 -63.1 -62.7 -63.4 69 -99 SPO 1997 04 27 07 30 40 4.1 -9 673.00 -63.1 -62.8 -63.4 69 -99 SPO 1997 04 27 07 31 39 4.1 -9 673.00 -63.1 -62.8 -63.4 69 -99 SPO 1997 04 27 07 32 40 4.0 -9 673.00 -63.1 -62.8 -63.4 69 -99 SPO 1997 04 27 07 33 39 4.0 -9 673.00 -63.1 -62.8 -63.4 69 -99 SPO 1997 04 27 07 34 39 4.0 -9 673.00 -63.1 -62.8 -63.3 69 -99 SPO 1997 04 27 07 35 40 4.1 -9 673.00 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 36 39 3.9 -9 673.00 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 37 40 3.9 -9 673.00 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 38 39 4.0 -9 673.00 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 39 40 4.0 -9 673.10 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 40 39 4.0 -9 673.10 -63.1 -62.7 -63.3 69 -99 SPO 1997 04 27 07 41 39 4.0 -9 673.10 -63.1 -62.7 -63.3 70 -99 SPO 1997 04 27 07 42 40 3.9 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 43 40 3.9 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 44 39 3.8 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 45 40 3.8 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 46 41 4.0 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 47 40 3.9 -9 673.10 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 48 41 3.9 -9 673.20 -63.1 -62.8 -63.3 70 -99 SPO 1997 04 27 07 49 41 3.8 -9 673.20 -63.2 -62.8 -63.3 71 -99 SPO 1997 04 27 07 50 41 4.0 -9 673.20 -63.2 -62.7 -63.3 70 -99 SPO 1997 04 27 07 51 40 4.1 -9 673.20 -63.2 -62.7 -63.3 70 -99 SPO 1997 04 27 07 52 41 4.0 -9 673.10 -63.2 -62.7 -63.3 71 -99 SPO 1997 04 27 07 53 40 4.0 -9 673.10 -63.2 -62.6 -63.3 71 -99 SPO 1997 04 27 07 54 41 4.0 -9 673.20 -63.2 -62.6 -63.3 70 -99 SPO 1997 04 27 07 55 43 4.0 -9 673.10 -63.2 -62.7 -63.3 70 -99 SPO 1997 04 27 07 56 42 4.1 -9 673.20 -63.2 -62.7 -63.3 71 -99 SPO 1997 04 27 07 57 42 4.1 -9 673.20 -63.1 -62.7 -63.2 70 -99 SPO 1997 04 27 07 58 44 3.8 -9 673.20 -63.2 -62.8 -63.2 71 -99 SPO 1997 04 27 07 59 44 3.6 -9 673.30 -63.2 -62.8 -63.3 71 -99 SPO 1997 04 27 08 00 45 3.5 -9 673.30 -63.2 -62.9 -63.3 72 0 SPO 1997 04 27 08 01 46 3.5 -9 673.30 -63.3 -62.9 -63.4 72 -99 SPO 1997 04 27 08 02 47 3.6 -9 673.30 -63.3 -62.9 -63.4 72 -99 SPO 1997 04 27 08 03 49 3.6 -9 673.30 -63.3 -62.9 -63.4 72 -99 SPO 1997 04 27 08 04 51 3.6 -9 673.30 -63.3 -62.9 -63.4 72 -99 SPO 1997 04 27 08 05 51 3.6 -9 673.30 -63.4 -62.9 -63.4 73 -99 SPO 1997 04 27 08 06 50 3.8 -9 673.30 -63.4 -63.0 -63.4 72 -99 SPO 1997 04 27 08 07 50 3.6 -9 673.30 -63.4 -63.0 -63.4 72 -99 SPO 1997 04 27 08 08 49 3.7 -9 673.30 -63.5 -63.0 -63.5 72 -99 SPO 1997 04 27 08 09 48 3.7 -9 673.30 -63.5 -63.0 -63.5 72 -99 SPO 1997 04 27 08 10 49 3.9 -9 673.30 -63.5 -63.1 -63.5 72 -99 SPO 1997 04 27 08 11 49 4.0 -9 673.30 -63.6 -63.1 -63.6 72 -99 SPO 1997 04 27 08 12 48 3.9 -9 673.30 -63.5 -63.1 -63.6 72 -99 SPO 1997 04 27 08 13 46 3.9 -9 673.30 -63.5 -63.1 -63.6 72 -99 SPO 1997 04 27 08 14 42 3.9 -9 673.30 -63.5 -63.1 -63.6 72 -99 SPO 1997 04 27 08 15 43 4.1 -9 673.30 -63.6 -63.1 -63.6 72 -99 SPO 1997 04 27 08 16 44 3.8 -9 673.30 -63.6 -63.2 -63.6 72 -99 SPO 1997 04 27 08 17 46 3.8 -9 673.30 -63.6 -63.2 -63.6 73 -99 SPO 1997 04 27 08 18 47 4.0 -9 673.30 -63.6 -63.2 -63.6 72 -99 SPO 1997 04 27 08 19 45 4.0 -9 673.30 -63.7 -63.2 -63.7 73 -99 SPO 1997 04 27 08 20 46 3.7 -9 673.30 -63.6 -63.2 -63.7 72 -99 SPO 1997 04 27 08 21 51 3.7 -9 673.40 -63.6 -63.3 -63.7 70 -99 SPO 1997 04 27 08 22 48 3.8 -9 673.30 -63.8 -63.3 -63.8 71 -99 SPO 1997 04 27 08 23 49 3.7 -9 673.30 -63.8 -63.3 -63.8 71 -99 SPO 1997 04 27 08 24 50 3.7 -9 673.30 -63.9 -63.4 -63.9 71 -99 SPO 1997 04 27 08 25 51 3.7 -9 673.40 -63.9 -63.4 -63.9 71 -99 SPO 1997 04 27 08 26 53 3.5 -9 673.30 -64.0 -63.6 -64.0 71 -99 SPO 1997 04 27 08 27 53 3.6 -9 673.30 -64.1 -63.6 -64.0 72 -99 SPO 1997 04 27 08 28 52 3.8 -9 673.30 -64.2 -63.6 -64.1 73 -99 SPO 1997 04 27 08 29 50 3.9 -9 673.30 -64.2 -63.6 -64.1 71 -99 SPO 1997 04 27 08 30 47 4.0 -9 673.30 -64.2 -63.5 -64.1 71 -99 SPO 1997 04 27 08 31 46 4.2 -9 673.30 -64.1 -63.4 -64.1 70 -99 SPO 1997 04 27 08 32 45 4.0 -9 673.30 -64.0 -63.3 -64.0 69 -99 SPO 1997 04 27 08 33 46 4.1 -9 673.30 -63.9 -63.2 -63.9 68 -99 SPO 1997 04 27 08 34 47 4.1 -9 673.30 -63.9 -63.2 -63.9 68 -99 SPO 1997 04 27 08 35 47 4.0 -9 673.30 -63.9 -63.3 -64.0 68 -99 SPO 1997 04 27 08 36 48 4.0 -9 673.30 -64.0 -63.4 -64.0 68 -99 SPO 1997 04 27 08 37 49 3.9 -9 673.30 -64.0 -63.4 -64.0 68 -99 SPO 1997 04 27 08 38 49 4.1 -9 673.30 -64.1 -63.4 -64.1 69 -99 SPO 1997 04 27 08 39 49 4.0 -9 673.40 -64.1 -63.4 -64.1 69 -99 SPO 1997 04 27 08 40 48 4.0 -9 673.40 -64.1 -63.4 -64.1 69 -99 SPO 1997 04 27 08 41 46 4.1 -9 673.40 -64.1 -63.5 -64.1 69 -99 SPO 1997 04 27 08 42 45 4.3 -9 673.40 -64.0 -63.4 -64.1 68 -99 SPO 1997 04 27 08 43 43 4.2 -9 673.30 -64.0 -63.4 -64.0 69 -99 SPO 1997 04 27 08 44 42 4.5 -9 673.30 -64.0 -63.3 -64.0 68 -99 SPO 1997 04 27 08 45 41 4.4 -9 673.30 -63.9 -63.3 -64.0 67 -99 SPO 1997 04 27 08 46 44 4.5 -9 673.30 -63.8 -63.3 -63.9 66 -99 SPO 1997 04 27 08 47 46 4.4 -9 673.30 -63.8 -63.2 -63.9 66 -99 SPO 1997 04 27 08 48 45 4.3 -9 673.30 -63.8 -63.2 -64.0 66 -99 SPO 1997 04 27 08 49 45 4.6 -9 673.30 -63.9 -63.2 -64.0 67 -99 SPO 1997 04 27 08 50 46 4.3 -9 673.30 -63.9 -63.3 -64.0 67 -99 SPO 1997 04 27 08 51 47 4.4 -9 673.30 -64.0 -63.4 -64.0 68 -99 SPO 1997 04 27 08 52 48 4.2 -9 673.30 -64.0 -63.4 -64.1 68 -99 SPO 1997 04 27 08 53 50 4.2 -9 673.30 -64.1 -63.4 -64.1 69 -99 SPO 1997 04 27 08 54 50 4.1 -9 673.30 -64.1 -63.5 -64.1 69 -99 SPO 1997 04 27 08 55 50 4.0 -9 673.30 -64.1 -63.5 -64.2 69 -99 SPO 1997 04 27 08 56 48 4.2 -9 673.30 -64.1 -63.5 -64.2 68 -99 SPO 1997 04 27 08 57 48 4.3 -9 673.30 -64.1 -63.5 -64.2 68 -99 SPO 1997 04 27 08 58 49 4.2 -9 673.30 -64.1 -63.5 -64.2 66 -99 SPO 1997 04 27 08 59 49 4.3 -9 673.30 -64.1 -63.5 -64.2 66 -99 SPO 1997 04 27 09 00 50 4.2 -9 673.30 -64.2 -63.6 -64.2 67 0 SPO 1997 04 27 09 01 51 4.1 -9 673.30 -64.2 -63.5 -64.2 69 -99 SPO 1997 04 27 09 02 49 4.1 -9 673.30 -64.2 -63.5 -64.2 69 -99 SPO 1997 04 27 09 03 49 4.2 -9 673.30 -64.2 -63.5 -64.3 69 -99 SPO 1997 04 27 09 04 49 4.1 -9 673.30 -64.3 -63.6 -64.3 70 -99 SPO 1997 04 27 09 05 49 4.1 -9 673.30 -64.3 -63.6 -64.3 70 -99 SPO 1997 04 27 09 06 51 4.0 -9 673.30 -64.3 -63.6 -64.3 68 -99 SPO 1997 04 27 09 07 50 3.9 -9 673.30 -64.3 -63.7 -64.4 67 -99 SPO 1997 04 27 09 08 50 3.8 -9 673.30 -64.4 -63.7 -64.4 68 -99 SPO 1997 04 27 09 09 51 3.9 -9 673.30 -64.4 -63.7 -64.4 67 -99 SPO 1997 04 27 09 10 50 4.0 -9 673.40 -64.4 -63.8 -64.4 67 -99 SPO 1997 04 27 09 11 50 3.9 -9 673.40 -64.4 -63.8 -64.4 67 -99 SPO 1997 04 27 09 12 49 4.0 -9 673.40 -64.4 -63.8 -64.4 67 -99 SPO 1997 04 27 09 13 48 4.0 -9 673.40 -64.4 -63.8 -64.4 67 -99 SPO 1997 04 27 09 14 47 4.2 -9 673.40 -64.4 -63.8 -64.4 67 -99 SPO 1997 04 27 09 15 47 4.1 -9 673.40 -64.4 -63.7 -64.4 67 -99 SPO 1997 04 27 09 16 46 4.0 -9 673.40 -64.3 -63.6 -64.4 67 -99 SPO 1997 04 27 09 17 46 4.1 -9 673.40 -64.3 -63.7 -64.4 67 -99 SPO 1997 04 27 09 18 47 4.2 -9 673.40 -64.3 -63.7 -64.4 67 -99 SPO 1997 04 27 09 19 48 4.2 -9 673.40 -64.3 -63.7 -64.4 67 -99 SPO 1997 04 27 09 20 47 4.2 -9 673.50 -64.4 -63.6 -64.4 67 -99 SPO 1997 04 27 09 21 47 4.3 -9 673.50 -64.4 -63.5 -64.4 67 -99 SPO 1997 04 27 09 22 48 4.2 -9 673.40 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 27 09 23 49 4.2 -9 673.50 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 27 09 24 49 4.3 -9 673.50 -64.3 -63.4 -64.4 66 -99 SPO 1997 04 27 09 25 48 4.2 -9 673.50 -64.3 -63.5 -64.4 66 -99 SPO 1997 04 27 09 26 49 4.2 -9 673.50 -64.4 -63.6 -64.4 67 -99 SPO 1997 04 27 09 27 48 4.2 -9 673.50 -64.4 -63.6 -64.5 68 -99 SPO 1997 04 27 09 28 48 4.0 -9 673.50 -64.4 -63.6 -64.5 68 -99 SPO 1997 04 27 09 29 47 4.0 -9 673.50 -64.4 -63.7 -64.5 67 -99 SPO 1997 04 27 09 30 47 4.1 -9 673.50 -64.5 -63.6 -64.5 68 -99 SPO 1997 04 27 09 31 46 4.2 -9 673.50 -64.5 -63.5 -64.5 67 -99 SPO 1997 04 27 09 32 46 4.0 -9 673.50 -64.5 -63.6 -64.5 67 -99 SPO 1997 04 27 09 33 48 3.9 -9 673.50 -64.5 -63.6 -64.5 67 -99 SPO 1997 04 27 09 34 49 4.0 -9 673.50 -64.5 -63.6 -64.5 67 -99 SPO 1997 04 27 09 35 51 3.9 -9 673.50 -64.5 -63.6 -64.5 67 -99 SPO 1997 04 27 09 36 50 3.8 -9 673.50 -64.4 -63.7 -64.5 66 -99 SPO 1997 04 27 09 37 50 3.8 -9 673.50 -64.5 -63.6 -64.5 67 -99 SPO 1997 04 27 09 38 52 4.0 -9 673.50 -64.5 -63.6 -64.6 67 -99 SPO 1997 04 27 09 39 54 4.0 -9 673.60 -64.5 -63.6 -64.6 67 -99 SPO 1997 04 27 09 40 53 4.0 -9 673.60 -64.6 -63.6 -64.6 68 -99 SPO 1997 04 27 09 41 53 3.7 -9 673.60 -64.6 -63.7 -64.6 68 -99 SPO 1997 04 27 09 42 54 3.9 -9 673.60 -64.6 -63.8 -64.6 66 -99 SPO 1997 04 27 09 43 53 3.9 -9 673.60 -64.7 -63.8 -64.7 67 -99 SPO 1997 04 27 09 44 49 3.9 -9 673.60 -64.8 -63.8 -64.7 67 -99 SPO 1997 04 27 09 45 48 4.0 -9 673.60 -64.7 -63.8 -64.7 65 -99 SPO 1997 04 27 09 46 47 4.2 -9 673.60 -64.6 -63.7 -64.7 64 -99 SPO 1997 04 27 09 47 47 4.1 -9 673.60 -64.6 -63.7 -64.6 65 -99 SPO 1997 04 27 09 48 48 4.1 -9 673.60 -64.5 -63.7 -64.6 65 -99 SPO 1997 04 27 09 49 49 4.2 -9 673.60 -64.6 -63.6 -64.6 66 -99 SPO 1997 04 27 09 50 49 4.0 -9 673.70 -64.6 -63.6 -64.7 66 -99 SPO 1997 04 27 09 51 50 4.1 -9 673.70 -64.6 -63.6 -64.7 65 -99 SPO 1997 04 27 09 52 53 4.0 -9 673.60 -64.7 -63.5 -64.7 66 -99 SPO 1997 04 27 09 53 54 4.0 -9 673.70 -64.7 -63.5 -64.7 65 -99 SPO 1997 04 27 09 54 53 4.2 -9 673.70 -64.7 -63.5 -64.7 65 -99 SPO 1997 04 27 09 55 54 4.1 -9 673.70 -64.7 -63.6 -64.7 65 -99 SPO 1997 04 27 09 56 55 4.1 -9 673.70 -64.7 -63.6 -64.7 65 -99 SPO 1997 04 27 09 57 54 3.9 -9 673.70 -64.7 -63.6 -64.8 65 -99 SPO 1997 04 27 09 58 53 4.0 -9 673.70 -64.7 -63.6 -64.8 65 -99 SPO 1997 04 27 09 59 51 4.0 -9 673.70 -64.8 -63.5 -64.8 66 -99 SPO 1997 04 27 10 00 50 4.0 -9 673.70 -64.7 -63.6 -64.8 66 0 SPO 1997 04 27 10 01 52 3.9 -9 673.70 -64.7 -63.6 -64.8 66 -99 SPO 1997 04 27 10 02 53 3.9 -9 673.60 -64.7 -63.6 -64.8 66 -99 SPO 1997 04 27 10 03 52 3.8 -9 673.60 -64.8 -63.7 -64.8 67 -99 SPO 1997 04 27 10 04 51 4.0 -9 673.60 -64.8 -63.6 -64.9 66 -99 SPO 1997 04 27 10 05 49 4.1 -9 673.60 -64.8 -63.6 -64.9 66 -99 SPO 1997 04 27 10 06 50 3.9 -9 673.60 -64.8 -63.5 -64.8 65 -99 SPO 1997 04 27 10 07 51 3.8 -9 673.60 -64.8 -63.5 -64.8 63 -99 SPO 1997 04 27 10 08 52 3.8 -9 673.70 -64.7 -63.5 -64.8 62 -99 SPO 1997 04 27 10 09 53 3.6 -9 673.70 -64.7 -63.6 -64.8 62 -99 SPO 1997 04 27 10 10 52 3.8 -9 673.70 -64.7 -63.6 -64.8 64 -99 SPO 1997 04 27 10 11 51 3.8 -9 673.70 -64.7 -63.6 -64.8 64 -99 SPO 1997 04 27 10 12 48 4.0 -9 673.60 -64.7 -63.5 -64.8 65 -99 SPO 1997 04 27 10 13 46 4.3 -9 673.60 -64.6 -63.4 -64.6 64 -99 SPO 1997 04 27 10 14 46 4.6 -9 673.60 -64.4 -63.2 -64.5 63 -99 SPO 1997 04 27 10 15 48 4.5 -9 673.60 -64.2 -63.2 -64.4 63 -99 SPO 1997 04 27 10 16 49 4.4 -9 673.60 -64.2 -63.3 -64.4 64 -99 SPO 1997 04 27 10 17 51 4.3 -9 673.60 -64.2 -63.3 -64.4 64 -99 SPO 1997 04 27 10 18 52 4.3 -9 673.60 -64.2 -63.4 -64.5 65 -99 SPO 1997 04 27 10 19 51 4.2 -9 673.60 -64.3 -63.5 -64.5 66 -99 SPO 1997 04 27 10 20 48 4.0 -9 673.60 -64.4 -63.5 -64.5 67 -99 SPO 1997 04 27 10 21 48 4.5 -9 673.60 -64.4 -63.4 -64.6 67 -99 SPO 1997 04 27 10 22 48 4.2 -9 673.60 -64.4 -63.3 -64.6 66 -99 SPO 1997 04 27 10 23 48 4.3 -9 673.60 -64.4 -63.2 -64.5 67 -99 SPO 1997 04 27 10 24 51 4.3 -9 673.60 -64.4 -63.4 -64.5 67 -99 SPO 1997 04 27 10 25 53 4.0 -9 673.60 -64.4 -63.5 -64.6 67 -99 SPO 1997 04 27 10 26 56 4.0 -9 673.60 -64.6 -63.6 -64.6 69 -99 SPO 1997 04 27 10 27 55 4.0 -9 673.60 -64.7 -63.7 -64.8 69 -99 SPO 1997 04 27 10 28 52 4.0 -9 673.60 -64.8 -63.7 -64.8 68 -99 SPO 1997 04 27 10 29 51 4.0 -9 673.60 -64.7 -63.6 -64.8 67 -99 SPO 1997 04 27 10 30 50 4.1 -9 673.60 -64.7 -63.6 -64.8 66 -99 SPO 1997 04 27 10 31 52 4.3 -9 673.60 -64.6 -63.5 -64.7 65 -99 SPO 1997 04 27 10 32 52 4.0 -9 673.60 -64.6 -63.4 -64.7 65 -99 SPO 1997 04 27 10 33 54 4.0 -9 673.60 -64.6 -63.6 -64.7 65 -99 SPO 1997 04 27 10 34 54 4.1 -9 673.60 -64.6 -63.6 -64.7 66 -99 SPO 1997 04 27 10 35 55 4.0 -9 673.60 -64.6 -63.6 -64.7 65 -99 SPO 1997 04 27 10 36 53 4.1 -9 673.60 -64.6 -63.5 -64.7 65 -99 SPO 1997 04 27 10 37 53 4.4 -9 673.60 -64.6 -63.4 -64.7 66 -99 SPO 1997 04 27 10 38 53 4.3 -9 673.60 -64.5 -63.4 -64.6 65 -99 SPO 1997 04 27 10 39 55 4.1 -9 673.60 -64.6 -63.5 -64.6 66 -99 SPO 1997 04 27 10 40 57 4.0 -9 673.60 -64.6 -63.7 -64.7 65 -99 SPO 1997 04 27 10 41 54 4.0 -9 673.60 -64.8 -63.8 -64.8 67 -99 SPO 1997 04 27 10 42 54 4.0 -9 673.60 -64.9 -63.7 -64.9 68 -99 SPO 1997 04 27 10 43 54 3.9 -9 673.60 -64.9 -63.7 -64.9 67 -99 SPO 1997 04 27 10 44 54 3.8 -9 673.70 -65.0 -63.7 -65.0 68 -99 SPO 1997 04 27 10 45 53 4.0 -9 673.70 -64.9 -63.7 -65.0 67 -99 SPO 1997 04 27 10 46 55 4.2 -9 673.70 -64.9 -63.7 -65.0 67 -99 SPO 1997 04 27 10 47 54 4.1 -9 673.70 -64.9 -63.6 -64.9 67 -99 SPO 1997 04 27 10 48 54 4.0 -9 673.70 -64.8 -63.6 -64.9 66 -99 SPO 1997 04 27 10 49 54 4.1 -9 673.70 -64.8 -63.6 -64.9 66 -99 SPO 1997 04 27 10 50 57 4.1 -9 673.70 -64.8 -63.6 -64.9 66 -99 SPO 1997 04 27 10 51 57 3.8 -9 673.80 -64.8 -63.7 -64.9 65 -99 SPO 1997 04 27 10 52 59 3.8 -9 673.80 -64.8 -63.7 -64.9 63 -99 SPO 1997 04 27 10 53 61 3.7 -9 673.80 -64.9 -63.8 -64.9 62 -99 SPO 1997 04 27 10 54 61 3.6 -9 673.80 -64.9 -63.9 -65.0 62 -99 SPO 1997 04 27 10 55 60 3.7 -9 673.80 -65.0 -63.9 -65.0 64 -99 SPO 1997 04 27 10 56 60 3.8 -9 673.80 -65.0 -64.0 -65.0 64 -99 SPO 1997 04 27 10 57 61 3.9 -9 673.80 -65.0 -64.0 -65.0 65 -99 SPO 1997 04 27 10 58 61 4.0 -9 673.80 -65.0 -64.0 -65.1 65 -99 SPO 1997 04 27 10 59 62 4.0 -9 673.80 -65.1 -63.9 -65.1 66 -99 SPO 1997 04 27 11 00 62 4.0 -9 673.80 -65.1 -63.8 -65.1 66 0 SPO 1997 04 27 11 01 62 3.8 -9 673.80 -65.1 -63.9 -65.1 66 -99 SPO 1997 04 27 11 02 61 4.0 -9 673.80 -65.1 -63.9 -65.2 65 -99 SPO 1997 04 27 11 03 62 4.1 -9 673.80 -65.1 -63.9 -65.1 65 -99 SPO 1997 04 27 11 04 62 4.1 -9 673.80 -65.1 -63.9 -65.2 65 -99 SPO 1997 04 27 11 05 61 4.1 -9 673.80 -65.2 -63.9 -65.2 65 -99 SPO 1997 04 27 11 06 61 4.3 -9 673.80 -65.2 -63.8 -65.2 65 -99 SPO 1997 04 27 11 07 58 4.0 -9 673.80 -65.2 -63.7 -65.2 65 -99 SPO 1997 04 27 11 08 60 4.0 -9 673.80 -65.2 -63.7 -65.2 65 -99 SPO 1997 04 27 11 09 59 4.0 -9 673.80 -65.2 -63.8 -65.3 65 -99 SPO 1997 04 27 11 10 61 4.0 -9 673.80 -65.2 -63.8 -65.2 65 -99 SPO 1997 04 27 11 11 61 3.9 -9 673.80 -65.2 -63.9 -65.2 65 -99 SPO 1997 04 27 11 12 62 3.8 -9 673.80 -65.2 -63.9 -65.3 65 -99 SPO 1997 04 27 11 13 59 3.9 -9 673.80 -65.2 -63.8 -65.3 65 -99 SPO 1997 04 27 11 14 59 4.0 -9 673.80 -65.2 -63.8 -65.3 65 -99 SPO 1997 04 27 11 15 60 4.0 -9 673.80 -65.2 -63.7 -65.3 65 -99 SPO 1997 04 27 11 16 59 4.0 -9 673.80 -65.2 -63.8 -65.3 65 -99 SPO 1997 04 27 11 17 58 3.9 -9 673.80 -65.2 -63.8 -65.3 65 -99 SPO 1997 04 27 11 18 58 4.0 -9 673.80 -65.2 -63.9 -65.3 65 -99 SPO 1997 04 27 11 19 58 3.9 -9 673.80 -65.3 -63.9 -65.3 66 -99 SPO 1997 04 27 11 20 59 4.0 -9 673.80 -65.3 -63.8 -65.3 66 -99 SPO 1997 04 27 11 21 61 4.1 -9 673.80 -65.2 -63.8 -65.3 64 -99 SPO 1997 04 27 11 22 60 3.9 -9 673.80 -65.2 -63.8 -65.3 64 -99 SPO 1997 04 27 11 23 60 4.2 -9 673.80 -65.3 -63.8 -65.3 65 -99 SPO 1997 04 27 11 24 59 4.3 -9 673.80 -65.2 -63.9 -65.3 64 -99 SPO 1997 04 27 11 25 57 4.2 -9 673.80 -65.2 -64.0 -65.3 64 -99 SPO 1997 04 27 11 26 58 4.0 -9 673.80 -65.2 -63.9 -65.3 64 -99 SPO 1997 04 27 11 27 58 4.2 -9 673.80 -65.2 -63.9 -65.3 64 -99 SPO 1997 04 27 11 28 57 4.1 -9 673.80 -65.2 -64.0 -65.2 65 -99 SPO 1997 04 27 11 29 59 4.1 -9 673.90 -65.2 -64.0 -65.2 65 -99 SPO 1997 04 27 11 30 58 4.2 -9 673.90 -65.1 -63.9 -65.3 64 -99 SPO 1997 04 27 11 31 58 4.2 -9 673.90 -65.1 -63.8 -65.2 64 -99 SPO 1997 04 27 11 32 57 4.3 -9 673.90 -65.1 -63.8 -65.2 64 -99 SPO 1997 04 27 11 33 58 4.2 -9 673.90 -65.1 -63.6 -65.2 65 -99 SPO 1997 04 27 11 34 59 4.4 -9 673.80 -65.1 -63.6 -65.2 65 -99 SPO 1997 04 27 11 35 55 4.2 -9 673.80 -65.1 -63.6 -65.2 65 -99 SPO 1997 04 27 11 36 54 4.5 -9 673.80 -65.0 -63.8 -65.2 63 -99 SPO 1997 04 27 11 37 55 4.6 -9 673.80 -65.0 -63.7 -65.1 63 -99 SPO 1997 04 27 11 38 51 4.4 -9 673.80 -65.0 -63.6 -65.1 63 -99 SPO 1997 04 27 11 39 55 4.7 -9 673.80 -64.9 -63.6 -65.1 63 -99 SPO 1997 04 27 11 40 57 4.8 -9 673.80 -65.0 -63.5 -65.1 63 -99 SPO 1997 04 27 11 41 55 4.7 -9 673.80 -65.0 -63.6 -65.1 63 -99 SPO 1997 04 27 11 42 55 4.9 -9 673.80 -65.0 -63.7 -65.1 63 -99 SPO 1997 04 27 11 43 55 4.7 -9 673.80 -65.0 -63.8 -65.1 64 -99 SPO 1997 04 27 11 44 54 4.6 -9 673.70 -65.0 -63.8 -65.1 64 -99 SPO 1997 04 27 11 45 54 4.7 -9 673.80 -65.0 -63.7 -65.1 64 -99 SPO 1997 04 27 11 46 55 4.7 -9 673.70 -65.0 -63.6 -65.1 65 -99 SPO 1997 04 27 11 47 55 4.5 -9 673.80 -64.9 -63.5 -65.0 64 -99 SPO 1997 04 27 11 48 54 4.5 -9 673.80 -64.9 -63.6 -65.1 64 -99 SPO 1997 04 27 11 49 54 4.6 -9 673.80 -65.0 -63.5 -65.1 65 -99 SPO 1997 04 27 11 50 54 4.5 -9 673.80 -65.0 -63.5 -65.1 65 -99 SPO 1997 04 27 11 51 52 4.4 -9 673.80 -65.0 -63.5 -65.1 63 -99 SPO 1997 04 27 11 52 52 4.4 -9 673.80 -65.0 -63.5 -65.1 63 -99 SPO 1997 04 27 11 53 54 4.6 -9 673.80 -65.0 -63.5 -65.1 64 -99 SPO 1997 04 27 11 54 55 4.7 -9 673.80 -65.0 -63.6 -65.1 65 -99 SPO 1997 04 27 11 55 57 4.3 -9 673.80 -64.9 -63.8 -65.0 64 -99 SPO 1997 04 27 11 56 61 4.5 -9 673.80 -65.0 -63.6 -65.1 67 -99 SPO 1997 04 27 11 57 60 4.4 -9 673.80 -65.1 -63.8 -65.2 68 -99 SPO 1997 04 27 11 58 59 4.3 -9 673.80 -65.2 -63.9 -65.2 67 -99 SPO 1997 04 27 11 59 59 4.3 -9 673.80 -65.2 -64.0 -65.3 66 -99 SPO 1997 04 27 12 00 60 4.2 -9 673.80 -65.3 -64.0 -65.3 67 0 SPO 1997 04 27 12 01 60 4.2 -9 673.80 -65.2 -64.0 -65.3 65 -99 SPO 1997 04 27 12 02 59 4.2 -9 673.80 -65.3 -64.0 -65.3 66 -99 SPO 1997 04 27 12 03 61 4.3 -9 673.80 -65.3 -64.0 -65.3 66 -99 SPO 1997 04 27 12 04 61 4.3 -9 673.80 -65.3 -64.0 -65.3 66 -99 SPO 1997 04 27 12 05 63 4.2 -9 673.80 -65.4 -64.0 -65.4 66 -99 SPO 1997 04 27 12 06 62 4.1 -9 673.90 -65.4 -64.0 -65.4 66 -99 SPO 1997 04 27 12 07 63 4.2 -9 673.90 -65.4 -64.0 -65.4 66 -99 SPO 1997 04 27 12 08 62 4.2 -9 673.90 -65.4 -64.1 -65.5 66 -99 SPO 1997 04 27 12 09 63 4.2 -9 673.90 -65.5 -64.2 -65.5 67 -99 SPO 1997 04 27 12 10 62 4.2 -9 673.90 -65.5 -64.2 -65.6 65 -99 SPO 1997 04 27 12 11 63 4.4 -9 673.90 -65.6 -64.2 -65.6 65 -99 SPO 1997 04 27 12 12 61 4.3 -9 673.90 -65.6 -64.1 -65.6 65 -99 SPO 1997 04 27 12 13 62 4.4 -9 673.90 -65.6 -64.0 -65.6 65 -99 SPO 1997 04 27 12 14 60 4.3 -9 673.90 -65.6 -63.9 -65.6 64 -99 SPO 1997 04 27 12 15 60 4.4 -9 673.90 -65.6 -64.0 -65.7 64 -99 SPO 1997 04 27 12 16 60 4.4 -9 673.90 -65.6 -63.9 -65.7 64 -99 SPO 1997 04 27 12 17 60 4.3 -9 673.90 -65.6 -63.9 -65.7 64 -99 SPO 1997 04 27 12 18 60 4.4 -9 673.90 -65.7 -63.8 -65.7 65 -99 SPO 1997 04 27 12 19 59 4.4 -9 673.90 -65.7 -63.8 -65.7 65 -99 SPO 1997 04 27 12 20 60 4.4 -9 673.90 -65.7 -63.8 -65.7 65 -99 SPO 1997 04 27 12 21 61 4.5 -9 673.90 -65.6 -63.8 -65.7 64 -99 SPO 1997 04 27 12 22 61 4.5 -9 673.90 -65.7 -63.7 -65.7 65 -99 SPO 1997 04 27 12 23 61 4.4 -9 673.90 -65.7 -63.7 -65.7 64 -99 SPO 1997 04 27 12 24 60 4.3 -9 673.90 -65.7 -63.7 -65.8 64 -99 SPO 1997 04 27 12 25 59 4.4 -9 673.90 -65.7 -63.7 -65.8 64 -99 SPO 1997 04 27 12 26 59 4.4 -9 673.90 -65.7 -63.6 -65.8 64 -99 SPO 1997 04 27 12 27 60 4.5 -9 673.90 -65.8 -63.5 -65.8 65 -99 SPO 1997 04 27 12 28 60 4.6 -9 673.90 -65.8 -63.5 -65.8 65 -99 SPO 1997 04 27 12 29 60 4.5 -9 673.90 -65.7 -63.4 -65.8 64 -99 SPO 1997 04 27 12 30 62 4.4 -9 673.90 -65.7 -63.5 -65.8 64 -99 SPO 1997 04 27 12 31 63 4.4 -9 673.90 -65.8 -63.6 -65.8 65 -99 SPO 1997 04 27 12 32 64 4.5 -9 673.90 -65.8 -63.6 -65.8 65 -99 SPO 1997 04 27 12 33 64 4.5 -9 673.90 -65.8 -63.6 -65.9 65 -99 SPO 1997 04 27 12 34 65 4.4 -9 673.90 -65.8 -63.6 -65.9 65 -99 SPO 1997 04 27 12 35 64 4.3 -9 673.90 -65.9 -63.6 -65.9 64 -99 SPO 1997 04 27 12 36 63 4.4 -9 673.90 -65.9 -63.6 -65.9 63 -99 SPO 1997 04 27 12 37 62 4.5 -9 673.90 -65.9 -63.6 -65.9 63 -99 SPO 1997 04 27 12 38 64 4.5 -9 673.90 -65.9 -63.6 -65.9 63 -99 SPO 1997 04 27 12 39 64 4.8 -9 673.90 -65.9 -63.5 -66.0 63 -99 SPO 1997 04 27 12 40 64 4.6 -9 673.90 -65.8 -63.5 -65.9 62 -99 SPO 1997 04 27 12 41 64 4.7 -9 673.90 -65.9 -63.5 -66.0 64 -99 SPO 1997 04 27 12 42 64 4.7 -9 673.90 -66.0 -63.5 -66.0 65 -99 SPO 1997 04 27 12 43 63 4.7 -9 673.90 -65.9 -63.5 -66.0 64 -99 SPO 1997 04 27 12 44 63 4.7 -9 673.90 -66.0 -63.4 -66.0 64 -99 SPO 1997 04 27 12 45 62 4.7 -9 673.90 -66.0 -63.4 -66.0 64 -99 SPO 1997 04 27 12 46 62 4.6 -9 673.90 -66.0 -63.3 -66.0 63 -99 SPO 1997 04 27 12 47 62 4.6 -9 673.90 -66.0 -63.3 -66.1 63 -99 SPO 1997 04 27 12 48 62 4.6 -9 673.90 -66.0 -63.2 -66.1 63 -99 SPO 1997 04 27 12 49 63 4.6 -9 673.90 -66.1 -63.2 -66.1 64 -99 SPO 1997 04 27 12 50 63 4.6 -9 673.90 -66.1 -63.2 -66.2 64 -99 SPO 1997 04 27 12 51 64 4.4 -9 673.90 -66.1 -63.3 -66.2 63 -99 SPO 1997 04 27 12 52 66 4.4 -9 673.90 -66.1 -63.4 -66.2 63 -99 SPO 1997 04 27 12 53 65 4.4 -9 673.90 -66.2 -63.6 -66.2 65 -99 SPO 1997 04 27 12 54 66 4.4 -9 673.90 -66.2 -63.6 -66.2 64 -99 SPO 1997 04 27 12 55 66 4.3 -9 673.90 -66.2 -63.6 -66.3 64 -99 SPO 1997 04 27 12 56 67 4.4 -9 673.90 -66.3 -63.6 -66.3 63 -99 SPO 1997 04 27 12 57 66 4.5 -9 673.90 -66.4 -63.6 -66.4 63 -99 SPO 1997 04 27 12 58 66 4.5 -9 673.90 -66.4 -63.6 -66.4 63 -99 SPO 1997 04 27 12 59 68 4.5 -9 673.90 -66.4 -63.5 -66.4 62 -99 SPO 1997 04 27 13 00 70 4.2 -9 673.90 -66.4 -63.6 -66.4 62 0 SPO 1997 04 27 13 01 72 4.3 -9 673.90 -66.4 -63.6 -66.4 62 -99 SPO 1997 04 27 13 02 71 4.2 -9 673.90 -66.4 -63.6 -66.4 62 -99 SPO 1997 04 27 13 03 72 4.3 -9 673.90 -66.4 -63.6 -66.4 62 -99 SPO 1997 04 27 13 04 72 4.3 -9 673.90 -66.5 -63.7 -66.5 64 -99 SPO 1997 04 27 13 05 72 4.3 -9 673.90 -66.5 -63.7 -66.5 63 -99 SPO 1997 04 27 13 06 72 4.2 -9 674.00 -66.5 -63.7 -66.5 63 -99 SPO 1997 04 27 13 07 71 4.2 -9 674.00 -66.5 -63.7 -66.5 63 -99 SPO 1997 04 27 13 08 72 4.3 -9 674.00 -66.6 -63.8 -66.5 64 -99 SPO 1997 04 27 13 09 71 4.3 -9 674.00 -66.6 -63.8 -66.6 64 -99 SPO 1997 04 27 13 10 70 4.3 -9 674.00 -66.6 -63.8 -66.6 64 -99 SPO 1997 04 27 13 11 69 4.5 -9 674.00 -66.6 -63.7 -66.6 64 -99 SPO 1997 04 27 13 12 68 4.5 -9 674.00 -66.6 -63.7 -66.7 64 -99 SPO 1997 04 27 13 13 67 4.6 -9 674.00 -66.7 -63.6 -66.7 65 -99 SPO 1997 04 27 13 14 66 4.8 -9 674.00 -66.6 -63.6 -66.7 64 -99 SPO 1997 04 27 13 15 65 4.8 -9 674.00 -66.6 -63.5 -66.7 63 -99 SPO 1997 04 27 13 16 63 4.7 -9 674.00 -66.5 -63.5 -66.6 63 -99 SPO 1997 04 27 13 17 62 4.8 -9 674.00 -66.4 -63.5 -66.6 62 -99 SPO 1997 04 27 13 18 61 4.8 -9 674.00 -66.4 -63.4 -66.5 62 -99 SPO 1997 04 27 13 19 61 4.7 -9 674.00 -66.4 -63.4 -66.5 62 -99 SPO 1997 04 27 13 20 61 4.7 -9 674.00 -66.4 -63.4 -66.5 61 -99 SPO 1997 04 27 13 21 59 4.7 -9 674.00 -66.4 -63.4 -66.5 61 -99 SPO 1997 04 27 13 22 57 4.7 -9 674.00 -66.5 -63.4 -66.6 62 -99 SPO 1997 04 27 13 23 58 4.7 -9 674.00 -66.5 -63.5 -66.6 62 -99 SPO 1997 04 27 13 24 59 4.8 -9 674.00 -66.6 -63.5 -66.6 63 -99 SPO 1997 04 27 13 25 58 4.9 -9 674.00 -66.6 -63.5 -66.7 64 -99 SPO 1997 04 27 13 26 58 4.9 -9 674.00 -66.6 -63.5 -66.7 64 -99 SPO 1997 04 27 13 27 59 5.0 -9 674.10 -66.6 -63.4 -66.6 64 -99 SPO 1997 04 27 13 28 60 4.9 -9 674.10 -66.5 -63.4 -66.6 63 -99 SPO 1997 04 27 13 29 61 5.0 -9 674.10 -66.4 -63.4 -66.6 62 -99 SPO 1997 04 27 13 30 61 4.9 -9 674.00 -66.3 -63.4 -66.5 61 -99 SPO 1997 04 27 13 31 61 5.0 -9 674.00 -66.3 -63.5 -66.4 61 -99 SPO 1997 04 27 13 32 61 5.0 -9 674.00 -66.3 -63.5 -66.4 61 -99 SPO 1997 04 27 13 33 61 5.0 -9 674.00 -66.2 -63.4 -66.4 61 -99 SPO 1997 04 27 13 34 61 5.0 -9 674.10 -66.1 -63.3 -66.3 60 -99 SPO 1997 04 27 13 35 61 5.2 -9 674.10 -66.0 -63.3 -66.3 60 -99 SPO 1997 04 27 13 36 61 5.1 -9 674.10 -66.0 -63.3 -66.2 61 -99 SPO 1997 04 27 13 37 61 5.3 -9 674.10 -66.0 -63.3 -66.2 62 -99 SPO 1997 04 27 13 38 61 5.2 -9 674.10 -66.0 -63.3 -66.2 63 -99 SPO 1997 04 27 13 39 61 5.2 -9 674.10 -65.9 -63.3 -66.2 62 -99 SPO 1997 04 27 13 40 61 5.2 -9 674.10 -66.0 -63.3 -66.2 63 -99 SPO 1997 04 27 13 41 61 5.1 -9 674.00 -65.9 -63.2 -66.1 62 -99 SPO 1997 04 27 13 42 60 5.1 -9 674.10 -65.9 -63.2 -66.1 62 -99 SPO 1997 04 27 13 43 61 5.3 -9 674.10 -65.9 -63.2 -66.1 62 -99 SPO 1997 04 27 13 44 62 5.3 -9 674.10 -65.9 -63.3 -66.1 62 -99 SPO 1997 04 27 13 45 62 5.3 -9 674.10 -65.9 -63.4 -66.1 62 -99 SPO 1997 04 27 13 46 63 5.2 -9 674.10 -65.8 -63.3 -66.0 62 -99 SPO 1997 04 27 13 47 64 5.2 -9 674.10 -65.8 -63.4 -66.0 62 -99 SPO 1997 04 27 13 48 64 5.0 -9 674.10 -65.8 -63.4 -66.0 62 -99 SPO 1997 04 27 13 49 65 5.1 -9 674.10 -65.7 -63.3 -65.9 61 -99 SPO 1997 04 27 13 50 63 5.0 -9 674.10 -65.7 -63.4 -66.0 62 -99 SPO 1997 04 27 13 51 63 5.1 -9 674.10 -65.8 -63.4 -66.0 63 -99 SPO 1997 04 27 13 52 63 5.0 -9 674.10 -65.8 -63.4 -66.0 63 -99 SPO 1997 04 27 13 53 63 5.0 -9 674.10 -65.8 -63.5 -66.0 62 -99 SPO 1997 04 27 13 54 62 5.3 -9 674.10 -65.9 -63.4 -66.0 63 -99 SPO 1997 04 27 13 55 62 5.2 -9 674.10 -65.9 -63.4 -66.0 62 -99 SPO 1997 04 27 13 56 61 5.2 -9 674.10 -65.8 -63.5 -66.0 61 -99 SPO 1997 04 27 13 57 61 5.2 -9 674.10 -65.8 -63.4 -66.0 61 -99 SPO 1997 04 27 13 58 60 5.2 -9 674.10 -65.8 -63.4 -66.0 62 -99 SPO 1997 04 27 13 59 60 5.2 -9 674.10 -65.8 -63.4 -66.0 63 -99 SPO 1997 04 27 14 00 60 5.3 -9 674.10 -65.8 -63.4 -66.0 63 0 SPO 1997 04 27 14 01 61 5.2 -9 674.10 -65.9 -63.4 -66.0 64 -99 SPO 1997 04 27 14 02 60 5.0 -9 674.10 -65.9 -63.4 -66.0 66 -99 SPO 1997 04 27 14 03 61 5.0 -9 674.10 -66.0 -63.3 -66.1 65 -99 SPO 1997 04 27 14 04 61 5.1 -9 674.10 -66.0 -63.3 -66.1 64 -99 SPO 1997 04 27 14 05 61 5.0 -9 674.10 -66.1 -63.3 -66.2 64 -99 SPO 1997 04 27 14 06 62 5.1 -9 674.10 -66.1 -63.3 -66.2 64 -99 SPO 1997 04 27 14 07 63 5.0 -9 674.10 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 08 63 5.0 -9 674.10 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 09 63 4.8 -9 674.20 -66.1 -63.3 -66.2 64 -99 SPO 1997 04 27 14 10 63 4.8 -9 674.20 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 11 62 4.7 -9 674.20 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 12 62 4.9 -9 674.20 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 13 63 4.7 -9 674.20 -66.1 -63.4 -66.2 64 -99 SPO 1997 04 27 14 14 62 4.7 -9 674.20 -66.1 -63.6 -66.2 64 -99 SPO 1997 04 27 14 15 62 4.6 -9 674.20 -66.1 -63.5 -66.2 64 -99 SPO 1997 04 27 14 16 63 4.7 -9 674.20 -66.1 -63.5 -66.2 64 -99 SPO 1997 04 27 14 17 63 4.8 -9 674.20 -66.1 -63.5 -66.2 64 -99 SPO 1997 04 27 14 18 63 4.7 -9 674.20 -66.1 -63.5 -66.2 64 -99 SPO 1997 04 27 14 19 63 4.5 -9 674.20 -66.1 -63.6 -66.2 63 -99 SPO 1997 04 27 14 20 64 4.4 -9 674.20 -66.2 -63.7 -66.2 64 -99 SPO 1997 04 27 14 21 64 4.3 -9 674.20 -66.2 -63.8 -66.3 65 -99 SPO 1997 04 27 14 22 64 4.3 -9 674.20 -66.2 -63.9 -66.3 65 -99 SPO 1997 04 27 14 23 64 4.2 -9 674.20 -66.3 -63.9 -66.4 66 -99 SPO 1997 04 27 14 24 64 4.2 -9 674.20 -66.4 -64.0 -66.4 66 -99 SPO 1997 04 27 14 25 65 4.1 -9 674.20 -66.4 -63.9 -66.4 66 -99 SPO 1997 04 27 14 26 66 4.2 -9 674.20 -66.5 -63.9 -66.5 66 -99 SPO 1997 04 27 14 27 65 4.1 -9 674.20 -66.4 -64.0 -66.5 66 -99 SPO 1997 04 27 14 28 62 4.3 -9 674.20 -66.5 -64.0 -66.5 65 -99 SPO 1997 04 27 14 29 62 4.3 -9 674.20 -66.5 -63.7 -66.5 65 -99 SPO 1997 04 27 14 30 63 4.6 -9 674.20 -66.5 -63.6 -66.6 64 -99 SPO 1997 04 27 14 31 63 4.6 -9 674.20 -66.5 -63.6 -66.5 64 -99 SPO 1997 04 27 14 32 62 4.7 -9 674.10 -66.4 -63.6 -66.5 62 -99 SPO 1997 04 27 14 33 61 4.5 -9 674.10 -66.4 -63.6 -66.5 62 -99 SPO 1997 04 27 14 34 59 4.5 -9 674.10 -66.4 -63.7 -66.4 62 -99 SPO 1997 04 27 14 35 58 4.5 -9 674.10 -66.3 -63.8 -66.4 62 -99 SPO 1997 04 27 14 36 58 4.5 -9 674.10 -66.3 -63.7 -66.4 63 -99 SPO 1997 04 27 14 37 58 4.6 -9 674.10 -66.4 -63.7 -66.4 64 -99 SPO 1997 04 27 14 38 58 4.6 -9 674.10 -66.4 -63.7 -66.4 63 -99 SPO 1997 04 27 14 39 59 4.7 -9 674.10 -66.3 -63.7 -66.4 62 -99 SPO 1997 04 27 14 40 59 4.6 -9 674.10 -66.3 -63.7 -66.4 61 -99 SPO 1997 04 27 14 41 59 4.6 -9 674.10 -66.3 -63.6 -66.4 61 -99 SPO 1997 04 27 14 42 59 4.6 -9 674.20 -66.3 -63.7 -66.4 61 -99 SPO 1997 04 27 14 43 59 4.5 -9 674.20 -66.2 -63.7 -66.4 61 -99 SPO 1997 04 27 14 44 59 4.5 -9 674.20 -66.2 -63.6 -66.3 61 -99 SPO 1997 04 27 14 45 60 4.6 -9 674.20 -66.1 -63.5 -66.3 61 -99 SPO 1997 04 27 14 46 62 4.5 -9 674.20 -66.1 -63.5 -66.2 61 -99 SPO 1997 04 27 14 47 63 4.5 -9 674.20 -66.1 -63.6 -66.2 63 -99 SPO 1997 04 27 14 48 63 4.4 -9 674.20 -66.0 -63.7 -66.2 62 -99 SPO 1997 04 27 14 49 64 4.4 -9 674.30 -66.0 -63.7 -66.2 62 -99 SPO 1997 04 27 14 50 64 4.3 -9 674.30 -66.1 -63.8 -66.3 63 -99 SPO 1997 04 27 14 51 65 4.3 -9 674.30 -66.1 -63.8 -66.3 63 -99 SPO 1997 04 27 14 52 65 4.3 -9 674.30 -66.2 -63.7 -66.4 62 -99 SPO 1997 04 27 14 53 65 4.3 -9 674.30 -66.2 -63.7 -66.4 62 -99 SPO 1997 04 27 14 54 66 4.4 -9 674.30 -66.4 -63.6 -66.4 64 -99 SPO 1997 04 27 14 55 66 4.5 -9 674.30 -66.4 -63.5 -66.5 63 -99 SPO 1997 04 27 14 56 66 4.6 -9 674.30 -66.4 -63.5 -66.5 63 -99 SPO 1997 04 27 14 57 66 4.5 -9 674.30 -66.4 -63.5 -66.5 63 -99 SPO 1997 04 27 14 58 66 4.5 -9 674.20 -66.4 -63.5 -66.5 64 -99 SPO 1997 04 27 14 59 66 4.5 -9 674.20 -66.4 -63.5 -66.5 64 -99 SPO 1997 04 27 15 00 66 4.5 -9 674.20 -66.4 -63.4 -66.5 63 0 SPO 1997 04 27 15 01 66 4.5 -9 674.20 -66.5 -63.3 -66.6 64 -99 SPO 1997 04 27 15 02 66 4.6 -9 674.20 -66.6 -63.2 -66.6 64 -99 SPO 1997 04 27 15 03 66 4.8 -9 674.20 -66.6 -63.2 -66.7 64 -99 SPO 1997 04 27 15 04 66 4.9 -9 674.20 -66.7 -63.2 -66.7 65 -99 SPO 1997 04 27 15 05 65 4.9 -9 674.20 -66.7 -63.2 -66.7 65 -99 SPO 1997 04 27 15 06 65 4.9 -9 674.20 -66.7 -63.1 -66.7 64 -99 SPO 1997 04 27 15 07 66 4.9 -9 674.20 -66.7 -63.1 -66.7 65 -99 SPO 1997 04 27 15 08 68 4.9 -9 674.20 -66.7 -63.1 -66.7 65 -99 SPO 1997 04 27 15 09 68 5.0 -9 674.20 -66.7 -63.2 -66.7 65 -99 SPO 1997 04 27 15 10 69 4.9 -9 674.20 -66.7 -63.2 -66.8 65 -99 SPO 1997 04 27 15 11 69 4.9 -9 674.20 -66.7 -63.3 -66.8 64 -99 SPO 1997 04 27 15 12 69 4.8 -9 674.20 -66.6 -63.4 -66.7 63 -99 SPO 1997 04 27 15 13 69 4.9 -9 674.20 -66.6 -63.4 -66.7 63 -99 SPO 1997 04 27 15 14 68 4.8 -9 674.20 -66.6 -63.4 -66.7 63 -99 SPO 1997 04 27 15 15 68 4.7 -9 674.20 -66.5 -63.3 -66.7 62 -99 SPO 1997 04 27 15 16 70 4.8 -9 674.20 -66.5 -63.3 -66.7 62 -99 SPO 1997 04 27 15 17 70 4.8 -9 674.20 -66.6 -63.3 -66.7 61 -99 SPO 1997 04 27 15 18 70 4.8 -9 674.20 -66.6 -63.4 -66.7 63 -99 SPO 1997 04 27 15 19 71 4.8 -9 674.20 -66.6 -63.5 -66.7 63 -99 SPO 1997 04 27 15 20 70 4.8 -9 674.20 -66.6 -63.7 -66.7 64 -99 SPO 1997 04 27 15 21 70 4.7 -9 674.20 -66.6 -63.8 -66.7 64 -99 SPO 1997 04 27 15 22 70 4.8 -9 674.20 -66.6 -63.8 -66.7 64 -99 SPO 1997 04 27 15 23 69 5.0 -9 674.20 -66.6 -63.8 -66.7 64 -99 SPO 1997 04 27 15 24 68 5.0 -9 674.20 -66.6 -63.7 -66.7 64 -99 SPO 1997 04 27 15 25 69 5.0 -9 674.20 -66.6 -63.6 -66.7 64 -99 SPO 1997 04 27 15 26 69 4.8 -9 674.20 -66.6 -63.6 -66.7 63 -99 SPO 1997 04 27 15 27 68 4.9 -9 674.10 -66.6 -63.6 -66.7 63 -99 SPO 1997 04 27 15 28 67 4.9 -9 674.10 -66.7 -63.5 -66.8 64 -99 SPO 1997 04 27 15 29 66 5.0 -9 674.10 -66.7 -63.4 -66.8 62 -99 SPO 1997 04 27 15 30 65 5.0 -9 674.10 -66.7 -63.3 -66.8 62 -99 SPO 1997 04 27 15 31 65 5.1 -9 674.10 -66.7 -63.2 -66.8 62 -99 SPO 1997 04 27 15 32 64 5.1 -9 674.10 -66.7 -63.1 -66.8 62 -99 SPO 1997 04 27 15 33 65 5.0 -9 674.10 -66.6 -63.1 -66.7 61 -99 SPO 1997 04 27 15 34 65 5.0 -9 674.10 -66.6 -63.1 -66.7 63 -99 SPO 1997 04 27 15 35 64 5.1 -9 674.10 -66.5 -63.2 -66.7 62 -99 SPO 1997 04 27 15 36 64 5.0 -9 674.10 -66.5 -63.2 -66.6 62 -99 SPO 1997 04 27 15 37 64 4.9 -9 674.10 -66.5 -63.2 -66.7 62 -99 SPO 1997 04 27 15 38 65 5.0 -9 674.10 -66.6 -63.1 -66.7 63 -99 SPO 1997 04 27 15 39 65 5.0 -9 674.20 -66.6 -63.1 -66.7 63 -99 SPO 1997 04 27 15 40 64 5.1 -9 674.20 -66.6 -63.1 -66.7 63 -99 SPO 1997 04 27 15 41 63 5.1 -9 674.20 -66.5 -63.0 -66.7 62 -99 SPO 1997 04 27 15 42 63 5.0 -9 674.20 -66.4 -63.1 -66.6 62 -99 SPO 1997 04 27 15 43 62 5.1 -9 674.20 -66.4 -63.0 -66.6 62 -99 SPO 1997 04 27 15 44 62 5.1 -9 674.20 -66.4 -63.0 -66.6 62 -99 SPO 1997 04 27 15 45 62 5.0 -9 674.20 -66.4 -62.8 -66.6 63 -99 SPO 1997 04 27 15 46 63 5.0 -9 674.20 -66.5 -62.7 -66.6 63 -99 SPO 1997 04 27 15 47 62 4.9 -9 674.20 -66.5 -62.6 -66.7 63 -99 SPO 1997 04 27 15 48 64 4.7 -9 674.20 -66.6 -62.7 -66.7 64 -99 SPO 1997 04 27 15 49 64 4.6 -9 674.20 -66.6 -62.7 -66.7 63 -99 SPO 1997 04 27 15 50 65 4.6 -9 674.20 -66.7 -62.8 -66.8 62 -99 SPO 1997 04 27 15 51 65 4.5 -9 674.20 -66.7 -62.8 -66.8 62 -99 SPO 1997 04 27 15 52 65 4.5 -9 674.20 -66.8 -62.8 -66.8 62 -99 SPO 1997 04 27 15 53 65 4.5 -9 674.20 -66.8 -63.0 -66.9 62 -99 SPO 1997 04 27 15 54 65 4.3 -9 674.20 -66.9 -63.1 -66.9 64 -99 SPO 1997 04 27 15 55 64 4.2 -9 674.30 -66.9 -63.2 -66.9 64 -99 SPO 1997 04 27 15 56 63 4.2 -9 674.30 -66.9 -63.1 -66.9 64 -99 SPO 1997 04 27 15 57 63 4.2 -9 674.30 -66.9 -63.1 -67.0 64 -99 SPO 1997 04 27 15 58 63 4.2 -9 674.30 -66.9 -63.1 -67.0 64 -99 SPO 1997 04 27 15 59 61 4.4 -9 674.30 -66.9 -63.0 -67.0 64 -99 SPO 1997 04 27 16 00 61 4.3 -9 674.30 -67.0 -62.9 -67.0 64 0 SPO 1997 04 27 16 01 63 4.2 -9 674.30 -66.9 -62.9 -67.0 62 -99 SPO 1997 04 27 16 02 63 4.1 -9 674.30 -66.9 -63.0 -66.9 62 -99 SPO 1997 04 27 16 03 63 4.1 -9 674.40 -66.9 -63.1 -67.0 62 -99 SPO 1997 04 27 16 04 63 4.1 -9 674.40 -66.9 -63.1 -67.0 63 -99 SPO 1997 04 27 16 05 64 4.2 -9 674.40 -66.9 -63.0 -67.0 63 -99 SPO 1997 04 27 16 06 65 4.3 -9 674.40 -66.9 -63.0 -67.0 64 -99 SPO 1997 04 27 16 07 65 4.5 -9 674.40 -66.8 -62.9 -67.0 63 -99 SPO 1997 04 27 16 08 67 4.3 -9 674.40 -66.7 -62.9 -66.9 62 -99 SPO 1997 04 27 16 09 68 4.5 -9 674.40 -66.6 -62.9 -66.8 61 -99 SPO 1997 04 27 16 10 68 4.6 -9 674.40 -66.4 -62.9 -66.8 60 -99 SPO 1997 04 27 16 11 68 4.6 -9 674.40 -66.4 -62.9 -66.6 61 -99 SPO 1997 04 27 16 12 66 4.8 -9 674.40 -66.3 -62.9 -66.6 61 -99 SPO 1997 04 27 16 13 66 4.8 -9 674.40 -66.3 -62.9 -66.6 61 -99 SPO 1997 04 27 16 14 65 4.8 -9 674.40 -66.3 -62.7 -66.6 61 -99 SPO 1997 04 27 16 15 64 4.8 -9 674.40 -66.4 -62.6 -66.6 62 -99 SPO 1997 04 27 16 16 64 4.8 -9 674.40 -66.4 -62.7 -66.6 62 -99 SPO 1997 04 27 16 17 63 5.0 -9 674.30 -66.4 -62.8 -66.6 63 -99 SPO 1997 04 27 16 18 63 5.1 -9 674.40 -66.4 -62.8 -66.6 63 -99 SPO 1997 04 27 16 19 63 5.0 -9 674.30 -66.4 -62.8 -66.6 64 -99 SPO 1997 04 27 16 20 64 5.0 -9 674.30 -66.4 -62.8 -66.6 64 -99 SPO 1997 04 27 16 21 64 5.0 -9 674.30 -66.3 -62.9 -66.5 63 -99 SPO 1997 04 27 16 22 65 5.0 -9 674.30 -66.3 -63.0 -66.5 62 -99 SPO 1997 04 27 16 23 66 5.1 -9 674.30 -66.3 -63.0 -66.5 62 -99 SPO 1997 04 27 16 24 66 5.1 -9 674.30 -66.3 -63.0 -66.5 62 -99 SPO 1997 04 27 16 25 65 5.2 -9 674.30 -66.3 -63.1 -66.5 62 -99 SPO 1997 04 27 16 26 64 5.2 -9 674.30 -66.3 -63.1 -66.5 62 -99 SPO 1997 04 27 16 27 63 5.2 -9 674.30 -66.3 -63.1 -66.5 62 -99 SPO 1997 04 27 16 28 63 5.3 -9 674.30 -66.3 -63.0 -66.5 63 -99 SPO 1997 04 27 16 29 62 5.1 -9 674.30 -66.3 -62.9 -66.5 63 -99 SPO 1997 04 27 16 30 62 5.1 -9 674.30 -66.4 -62.9 -66.5 64 -99 SPO 1997 04 27 16 31 61 5.1 -9 674.30 -66.5 -62.9 -66.6 64 -99 SPO 1997 04 27 16 32 60 5.1 -9 674.30 -66.6 -62.9 -66.6 65 -99 SPO 1997 04 27 16 33 59 5.2 -9 674.30 -66.6 -62.8 -66.7 65 -99 SPO 1997 04 27 16 34 59 5.2 -9 674.30 -66.6 -62.8 -66.7 65 -99 SPO 1997 04 27 16 35 58 5.2 -9 674.30 -66.6 -62.7 -66.7 64 -99 SPO 1997 04 27 16 36 57 5.3 -9 674.30 -66.6 -62.6 -66.7 64 -99 SPO 1997 04 27 16 37 56 5.5 -9 674.30 -66.6 -62.6 -66.7 64 -99 SPO 1997 04 27 16 38 56 5.5 -9 674.30 -66.6 -62.6 -66.7 63 -99 SPO 1997 04 27 16 39 55 5.5 -9 674.20 -66.5 -62.6 -66.6 63 -99 SPO 1997 04 27 16 40 56 5.5 -9 674.20 -66.4 -62.6 -66.5 62 -99 SPO 1997 04 27 16 41 56 5.5 -9 674.20 -66.4 -62.5 -66.5 62 -99 SPO 1997 04 27 16 42 56 5.5 -9 674.20 -66.4 -62.4 -66.5 63 -99 SPO 1997 04 27 16 43 56 5.5 -9 674.20 -66.4 -62.4 -66.5 63 -99 SPO 1997 04 27 16 44 56 5.6 -9 674.20 -66.4 -62.4 -66.5 62 -99 SPO 1997 04 27 16 45 56 5.6 -9 674.20 -66.4 -62.4 -66.5 62 -99 SPO 1997 04 27 16 46 58 5.4 -9 674.20 -66.3 -62.5 -66.5 61 -99 SPO 1997 04 27 16 47 58 5.4 -9 674.20 -66.3 -62.5 -66.5 61 -99 SPO 1997 04 27 16 48 59 5.3 -9 674.20 -66.3 -62.5 -66.5 61 -99 SPO 1997 04 27 16 49 59 5.2 -9 674.20 -66.3 -62.5 -66.5 61 -99 SPO 1997 04 27 16 50 59 5.3 -9 674.10 -66.4 -62.4 -66.5 62 -99 SPO 1997 04 27 16 51 58 5.5 -9 674.10 -66.4 -62.4 -66.5 62 -99 SPO 1997 04 27 16 52 58 5.5 -9 674.10 -66.4 -62.4 -66.5 62 -99 SPO 1997 04 27 16 53 58 5.7 -9 674.10 -66.3 -62.3 -66.5 62 -99 SPO 1997 04 27 16 54 58 5.8 -9 674.10 -66.3 -62.2 -66.5 62 -99 SPO 1997 04 27 16 55 58 5.9 -9 674.10 -66.3 -62.2 -66.4 62 -99 SPO 1997 04 27 16 56 58 5.8 -9 674.10 -66.2 -62.2 -66.4 61 -99 SPO 1997 04 27 16 57 59 5.7 -9 674.20 -66.2 -62.2 -66.3 61 -99 SPO 1997 04 27 16 58 60 5.7 -9 674.10 -66.2 -62.2 -66.4 61 -99 SPO 1997 04 27 16 59 61 5.6 -9 674.20 -66.2 -62.3 -66.4 61 -99 SPO 1997 04 27 17 00 61 5.5 -9 674.20 -66.2 -62.4 -66.4 61 0 SPO 1997 04 27 17 01 61 5.5 -9 674.20 -66.3 -62.4 -66.4 62 -99 SPO 1997 04 27 17 02 61 5.5 -9 674.20 -66.4 -62.4 -66.5 64 -99 SPO 1997 04 27 17 03 60 5.6 -9 674.20 -66.4 -62.4 -66.5 64 -99 SPO 1997 04 27 17 04 59 5.5 -9 674.20 -66.5 -62.4 -66.5 65 -99 SPO 1997 04 27 17 05 59 5.6 -9 674.20 -66.5 -62.5 -66.6 65 -99 SPO 1997 04 27 17 06 59 5.6 -9 674.20 -66.5 -62.5 -66.6 65 -99 SPO 1997 04 27 17 07 59 5.5 -9 674.20 -66.4 -62.5 -66.6 63 -99 SPO 1997 04 27 17 08 59 5.4 -9 674.20 -66.4 -62.6 -66.5 62 -99 SPO 1997 04 27 17 09 59 5.4 -9 674.30 -66.4 -62.6 -66.5 62 -99 SPO 1997 04 27 17 10 58 5.4 -9 674.30 -66.3 -62.6 -66.4 61 -99 SPO 1997 04 27 17 11 58 5.3 -9 674.30 -66.2 -62.8 -66.4 61 -99 SPO 1997 04 27 17 12 58 5.2 -9 674.40 -66.2 -62.8 -66.3 61 -99 SPO 1997 04 27 17 13 58 5.2 -9 674.30 -66.1 -62.8 -66.3 61 -99 SPO 1997 04 27 17 14 58 5.2 -9 674.30 -66.1 -62.9 -66.2 61 -99 SPO 1997 04 27 17 15 57 4.9 -9 674.30 -66.1 -63.1 -66.2 63 -99 SPO 1997 04 27 17 16 57 5.0 -9 674.30 -66.0 -63.1 -66.2 63 -99 SPO 1997 04 27 17 17 56 5.0 -9 674.40 -66.0 -63.1 -66.2 63 -99 SPO 1997 04 27 17 18 56 4.9 -9 674.40 -65.9 -63.0 -66.1 62 -99 SPO 1997 04 27 17 19 56 4.9 -9 674.40 -65.8 -63.0 -66.1 61 -99 SPO 1997 04 27 17 20 56 4.8 -9 674.50 -65.8 -62.9 -66.0 61 -99 SPO 1997 04 27 17 21 56 4.8 -9 674.40 -65.7 -62.9 -65.9 61 -99 SPO 1997 04 27 17 22 55 4.8 -9 674.50 -65.6 -62.9 -65.8 60 -99 SPO 1997 04 27 17 23 54 4.8 -9 674.50 -65.5 -62.8 -65.8 60 -99 SPO 1997 04 27 17 24 54 4.8 -9 674.50 -65.4 -62.8 -65.8 60 -99 SPO 1997 04 27 17 25 54 4.7 -9 674.50 -65.4 -62.8 -65.7 62 -99 SPO 1997 04 27 17 26 55 4.7 -9 674.60 -65.3 -62.7 -65.6 62 -99 SPO 1997 04 27 17 27 53 4.8 -9 674.60 -65.3 -62.7 -65.6 62 -99 SPO 1997 04 27 17 28 52 4.5 -9 674.60 -65.3 -62.8 -65.6 62 -99 SPO 1997 04 27 17 29 53 4.7 -9 674.60 -65.3 -62.8 -65.6 62 -99 SPO 1997 04 27 17 30 53 4.7 -9 674.60 -65.3 -62.7 -65.6 62 -99 SPO 1997 04 27 17 31 52 4.5 -9 674.60 -65.3 -62.8 -65.6 62 -99 SPO 1997 04 27 17 32 54 4.5 -9 674.60 -65.3 -62.9 -65.6 62 -99 SPO 1997 04 27 17 33 52 4.5 -9 674.60 -65.3 -62.8 -65.6 62 -99 SPO 1997 04 27 17 34 53 4.3 -9 674.70 -65.3 -62.8 -65.6 62 -99 SPO 1997 04 27 17 35 53 4.3 -9 674.70 -65.4 -62.9 -65.6 63 -99 SPO 1997 04 27 17 36 54 3.9 -9 674.70 -65.4 -63.0 -65.6 64 -99 SPO 1997 04 27 17 37 54 3.9 -9 674.70 -65.4 -63.1 -65.6 -99 -99 SPO 1997 04 27 17 38 55 3.7 -9 674.70 -65.5 -63.2 -65.7 -99 -99 SPO 1997 04 27 17 39 55 3.8 -9 674.70 -65.6 -63.2 -65.7 -99 -99 SPO 1997 04 27 17 40 55 4.0 -9 674.70 -65.6 -63.2 -65.7 -99 -99 SPO 1997 04 27 17 41 55 4.3 -9 674.70 -65.6 -63.0 -65.7 -99 -99 SPO 1997 04 27 17 42 54 4.6 -9 674.70 -65.5 -62.8 -65.7 63 -99 SPO 1997 04 27 17 43 54 4.8 -9 674.70 -65.4 -62.7 -65.6 62 -99 SPO 1997 04 27 17 44 54 4.8 -9 674.70 -65.4 -62.6 -65.6 63 -99 SPO 1997 04 27 17 45 54 4.9 -9 674.70 -65.4 -62.5 -65.6 63 -99 SPO 1997 04 27 17 46 54 5.0 -9 674.70 -65.4 -62.5 -65.6 62 -99 SPO 1997 04 27 17 47 55 5.0 -9 674.70 -65.5 -62.4 -65.6 64 -99 SPO 1997 04 27 17 48 55 5.1 -9 674.60 -65.5 -62.4 -65.6 64 -99 SPO 1997 04 27 17 49 56 5.1 -9 674.70 -65.5 -62.4 -65.6 64 -99 SPO 1997 04 27 17 50 55 5.1 -9 674.60 -65.6 -62.4 -65.7 66 -99 SPO 1997 04 27 17 51 55 5.2 -9 674.60 -65.6 -62.3 -65.7 65 -99 SPO 1997 04 27 17 52 54 5.2 -9 674.60 -65.6 -62.3 -65.7 65 -99 SPO 1997 04 27 17 53 55 5.2 -9 674.60 -65.6 -62.4 -65.7 65 -99 SPO 1997 04 27 17 54 55 5.1 -9 674.70 -65.6 -62.4 -65.7 65 -99 SPO 1997 04 27 17 55 56 5.1 -9 674.70 -65.6 -62.4 -65.7 64 -99 SPO 1997 04 27 17 56 57 5.1 -9 674.70 -65.6 -62.4 -65.7 64 -99 SPO 1997 04 27 17 57 56 5.0 -9 674.70 -65.5 -62.5 -65.7 63 -99 SPO 1997 04 27 17 58 56 5.1 -9 674.70 -65.5 -62.6 -65.6 63 -99 SPO 1997 04 27 17 59 57 5.1 -9 674.70 -65.5 -62.6 -65.6 -99 -99 SPO 1997 04 27 18 00 58 5.1 -9 674.70 -65.5 -62.6 -65.6 -99 0 SPO 1997 04 27 18 01 58 5.1 -9 674.60 -65.5 -62.6 -65.6 -99 -99 SPO 1997 04 27 18 02 57 5.1 -9 674.70 -65.5 -62.6 -65.6 -99 -99 SPO 1997 04 27 18 03 59 5.0 -9 674.70 -65.5 -62.6 -65.6 -99 -99 SPO 1997 04 27 18 04 59 4.9 -9 674.70 -65.5 -62.6 -65.6 65 -99 SPO 1997 04 27 18 05 59 4.7 -9 674.70 -65.5 -62.6 -65.6 64 -99 SPO 1997 04 27 18 06 60 4.8 -9 674.70 -65.5 -62.6 -65.6 64 -99 SPO 1997 04 27 18 07 59 4.8 -9 674.60 -65.5 -62.6 -65.6 64 -99 SPO 1997 04 27 18 08 58 4.9 -9 674.60 -65.5 -62.6 -65.6 64 -99 SPO 1997 04 27 18 09 58 4.9 -9 674.60 -65.5 -62.4 -65.6 64 -99 SPO 1997 04 27 18 10 58 4.9 -9 674.60 -65.5 -62.3 -65.6 64 -99 SPO 1997 04 27 18 11 58 5.1 -9 674.60 -65.5 -62.2 -65.6 63 -99 SPO 1997 04 27 18 12 58 5.2 -9 674.60 -65.5 -62.1 -65.6 63 -99 SPO 1997 04 27 18 13 59 5.1 -9 674.60 -65.5 -62.2 -65.6 64 -99 SPO 1997 04 27 18 14 60 5.2 -9 674.60 -65.5 -62.3 -65.6 -99 -99 SPO 1997 04 27 18 15 60 5.2 -9 674.60 -65.5 -62.2 -65.6 -99 -99 SPO 1997 04 27 18 16 60 5.2 -9 674.60 -65.5 -62.3 -65.6 -99 -99 SPO 1997 04 27 18 17 60 5.0 -9 674.60 -65.5 -62.2 -65.6 -99 -99 SPO 1997 04 27 18 18 61 5.1 -9 674.60 -65.5 -62.4 -65.6 -99 -99 SPO 1997 04 27 18 19 62 4.9 -9 674.60 -65.6 -62.4 -65.7 64 -99 SPO 1997 04 27 18 20 62 5.0 -9 674.60 -65.6 -62.4 -65.7 64 -99 SPO 1997 04 27 18 21 62 4.8 -9 674.60 -65.6 -62.6 -65.7 64 -99 SPO 1997 04 27 18 22 61 4.8 -9 674.60 -65.7 -62.7 -65.8 65 -99 SPO 1997 04 27 18 23 61 4.9 -9 674.70 -65.7 -62.7 -65.8 65 -99 SPO 1997 04 27 18 24 61 5.0 -9 674.70 -65.8 -62.6 -65.8 66 -99 SPO 1997 04 27 18 25 59 5.2 -9 674.70 -65.8 -62.4 -65.9 66 -99 SPO 1997 04 27 18 26 59 5.3 -9 674.70 -65.8 -62.1 -65.9 66 -99 SPO 1997 04 27 18 27 60 5.2 -9 674.70 -65.9 -62.1 -65.9 66 -99 SPO 1997 04 27 18 28 59 5.5 -9 674.70 -66.0 -62.2 -66.0 67 -99 SPO 1997 04 27 18 29 60 5.0 -9 674.70 -65.9 -62.2 -66.0 66 -99 SPO 1997 04 27 18 30 60 4.9 -9 674.70 -66.0 -62.3 -66.0 67 -99 SPO 1997 04 27 18 31 63 4.7 -9 674.70 -66.0 -62.4 -66.1 65 -99 SPO 1997 04 27 18 32 62 4.8 -9 674.60 -66.1 -62.4 -66.1 66 -99 SPO 1997 04 27 18 33 61 5.1 -9 674.60 -66.2 -62.3 -66.2 66 -99 SPO 1997 04 27 18 34 62 5.0 -9 674.70 -66.2 -62.4 -66.2 66 -99 SPO 1997 04 27 18 35 62 5.1 -9 674.60 -66.2 -62.2 -66.2 68 -99 SPO 1997 04 27 18 36 61 4.9 -9 674.70 -66.2 -62.3 -66.2 68 -99 SPO 1997 04 27 18 37 63 5.2 -9 674.60 -66.3 -62.3 -66.2 67 -99 SPO 1997 04 27 18 38 62 5.1 -9 674.60 -66.2 -62.2 -66.2 66 -99 SPO 1997 04 27 18 39 63 5.1 -9 674.60 -66.2 -62.3 -66.2 66 -99 SPO 1997 04 27 18 40 63 5.1 -9 674.60 -66.2 -62.3 -66.2 65 -99 SPO 1997 04 27 18 41 61 5.2 -9 674.60 -66.1 -62.4 -66.2 64 -99 SPO 1997 04 27 18 42 61 5.0 -9 674.60 -66.1 -62.5 -66.2 64 -99 SPO 1997 04 27 18 43 60 4.9 -9 674.60 -66.1 -62.6 -66.2 64 -99 SPO 1997 04 27 18 44 60 5.3 -9 674.60 -66.0 -62.4 -66.2 64 -99 SPO 1997 04 27 18 45 60 5.3 -9 674.60 -66.0 -62.2 -66.1 64 -99 SPO 1997 04 27 18 46 58 5.3 -9 674.60 -66.0 -62.3 -66.1 65 -99 SPO 1997 04 27 18 47 57 5.3 -9 674.60 -66.0 -62.2 -66.1 65 -99 SPO 1997 04 27 18 48 56 5.3 -9 674.60 -65.9 -62.0 -66.0 66 -99 SPO 1997 04 27 18 49 57 5.5 -9 674.60 -65.9 -61.9 -66.1 64 -99 SPO 1997 04 27 18 50 59 5.7 -9 674.50 -65.8 -61.8 -66.0 63 -99 SPO 1997 04 27 18 51 58 5.5 -9 674.50 -65.8 -61.8 -66.0 63 -99 SPO 1997 04 27 18 52 58 5.6 -9 674.50 -65.8 -61.7 -66.0 63 -99 SPO 1997 04 27 18 53 57 5.6 -9 674.50 -65.8 -61.7 -65.9 63 -99 SPO 1997 04 27 18 54 58 5.7 -9 674.50 -65.7 -61.7 -65.9 64 -99 SPO 1997 04 27 18 55 58 5.7 -9 674.50 -65.6 -61.6 -65.8 61 -99 SPO 1997 04 27 18 56 58 5.8 -9 674.50 -65.6 -61.6 -65.8 63 -99 SPO 1997 04 27 18 57 58 6.0 -9 674.50 -65.5 -61.7 -65.8 63 -99 SPO 1997 04 27 18 58 55 5.7 -9 674.50 -65.5 -61.7 -65.7 63 -99 SPO 1997 04 27 18 59 54 5.0 -9 674.60 -65.4 -62.0 -65.6 63 -99 SPO 1997 04 27 19 00 56 5.4 -9 674.60 -65.5 -62.0 -65.7 65 0 SPO 1997 04 27 19 01 56 5.7 -9 674.60 -65.4 -61.8 -65.6 64 -99 SPO 1997 04 27 19 02 57 6.1 -9 674.60 -65.4 -61.7 -65.6 64 -99 SPO 1997 04 27 19 03 57 5.9 -9 674.60 -65.3 -61.6 -65.5 63 -99 SPO 1997 04 27 19 04 57 5.9 -9 674.60 -65.3 -61.6 -65.5 -99 -99 SPO 1997 04 27 19 05 58 6.1 -9 674.60 -65.3 -61.7 -65.5 -99 -99 SPO 1997 04 27 19 06 58 6.2 -9 674.60 -65.3 -61.6 -65.5 -99 -99 SPO 1997 04 27 19 07 57 6.3 -9 674.60 -65.2 -61.6 -65.4 -99 -99 SPO 1997 04 27 19 08 57 6.6 -9 674.60 -65.2 -61.5 -65.4 -99 -99 SPO 1997 04 27 19 09 55 5.8 -9 674.60 -65.2 -61.6 -65.4 64 -99 SPO 1997 04 27 19 10 56 5.9 -9 674.60 -65.3 -61.6 -65.4 65 -99 SPO 1997 04 27 19 11 55 6.3 -9 674.60 -65.3 -61.6 -65.4 66 -99 SPO 1997 04 27 19 12 53 5.8 -9 674.60 -65.3 -61.6 -65.4 66 -99 SPO 1997 04 27 19 13 52 5.5 -9 674.60 -65.3 -61.9 -65.4 66 -99 SPO 1997 04 27 19 14 53 5.8 -9 674.60 -65.3 -61.9 -65.5 65 -99 SPO 1997 04 27 19 15 53 5.8 -9 674.60 -65.3 -61.8 -65.5 65 -99 SPO 1997 04 27 19 16 53 5.7 -9 674.60 -65.3 -61.8 -65.4 65 -99 SPO 1997 04 27 19 17 53 5.8 -9 674.60 -65.3 -61.6 -65.4 65 -99 SPO 1997 04 27 19 18 53 6.0 -9 674.60 -65.2 -61.6 -65.4 64 -99 SPO 1997 04 27 19 19 52 6.0 -9 674.60 -65.2 -61.4 -65.3 65 -99 SPO 1997 04 27 19 20 52 6.2 -9 674.60 -65.1 -61.4 -65.3 64 -99 SPO 1997 04 27 19 21 52 6.0 -9 674.60 -65.1 -61.3 -65.3 65 -99 SPO 1997 04 27 19 22 52 6.1 -9 674.60 -65.1 -61.3 -65.3 66 -99 SPO 1997 04 27 19 23 53 6.1 -9 674.60 -65.1 -61.2 -65.3 66 -99 SPO 1997 04 27 19 24 54 6.0 -9 674.60 -65.1 -61.2 -65.3 66 -99 SPO 1997 04 27 19 25 54 6.3 -9 674.60 -65.0 -61.2 -65.2 64 -99 SPO 1997 04 27 19 26 54 6.3 -9 674.60 -65.0 -61.3 -65.2 64 -99 SPO 1997 04 27 19 27 53 6.1 -9 674.60 -65.0 -61.3 -65.1 65 -99 SPO 1997 04 27 19 28 54 6.1 -9 674.60 -65.0 -61.3 -65.2 65 -99 SPO 1997 04 27 19 29 53 6.2 -9 674.60 -65.0 -61.3 -65.2 65 -99 SPO 1997 04 27 19 30 52 6.2 -9 674.60 -65.0 -61.2 -65.1 67 -99 SPO 1997 04 27 19 31 52 6.4 -9 674.60 -65.0 -61.2 -65.1 67 -99 SPO 1997 04 27 19 32 51 6.6 -9 674.60 -65.0 -61.1 -65.1 68 -99 SPO 1997 04 27 19 33 52 6.8 -9 674.60 -64.9 -61.0 -65.0 67 -99 SPO 1997 04 27 19 34 52 6.8 -9 674.60 -64.8 -61.0 -64.9 66 -99 SPO 1997 04 27 19 35 52 6.5 -9 674.60 -64.7 -61.1 -64.9 65 -99 SPO 1997 04 27 19 36 52 6.7 -9 674.60 -64.7 -61.1 -64.9 65 -99 SPO 1997 04 27 19 37 52 6.5 -9 674.60 -64.7 -61.1 -64.9 65 -99 SPO 1997 04 27 19 38 52 6.4 -9 674.60 -64.7 -61.1 -64.9 65 -99 SPO 1997 04 27 19 39 52 6.4 -9 674.60 -64.7 -61.1 -64.9 65 -99 SPO 1997 04 27 19 40 53 6.3 -9 674.60 -64.8 -61.1 -64.9 65 -99 SPO 1997 04 27 19 41 53 6.4 -9 674.70 -64.8 -61.2 -64.9 66 -99 SPO 1997 04 27 19 42 52 6.2 -9 674.70 -64.9 -61.2 -65.0 67 -99 SPO 1997 04 27 19 43 52 6.1 -9 674.70 -64.9 -61.2 -65.0 67 -99 SPO 1997 04 27 19 44 52 6.2 -9 674.70 -64.8 -61.2 -64.9 66 -99 SPO 1997 04 27 19 45 52 6.4 -9 674.70 -64.7 -61.1 -64.8 65 -99 SPO 1997 04 27 19 46 52 6.3 -9 674.70 -64.6 -61.1 -64.7 64 -99 SPO 1997 04 27 19 47 51 6.1 -9 674.70 -64.4 -61.1 -64.6 63 -99 SPO 1997 04 27 19 48 51 6.0 -9 674.70 -64.4 -61.2 -64.6 63 -99 SPO 1997 04 27 19 49 50 6.0 -9 674.70 -64.4 -61.1 -64.6 63 -99 SPO 1997 04 27 19 50 49 5.9 -9 674.70 -64.4 -61.0 -64.6 64 -99 SPO 1997 04 27 19 51 49 5.8 -9 674.70 -64.3 -61.0 -64.4 63 -99 SPO 1997 04 27 19 52 49 5.6 -9 674.70 -64.2 -61.0 -64.4 64 -99 SPO 1997 04 27 19 53 49 5.9 -9 674.70 -63.9 -61.0 -64.2 63 -99 SPO 1997 04 27 19 54 49 6.2 -9 674.70 -63.6 -61.0 -63.9 61 -99 SPO 1997 04 27 19 55 48 6.4 -9 674.70 -63.3 -60.9 -63.6 61 -99 SPO 1997 04 27 19 56 48 6.4 -9 674.70 -63.2 -60.9 -63.5 61 -99 SPO 1997 04 27 19 57 48 6.2 -9 674.70 -63.0 -60.9 -63.4 63 -99 SPO 1997 04 27 19 58 47 6.3 -9 674.70 -62.8 -60.9 -63.2 62 -99 SPO 1997 04 27 19 59 48 6.4 -9 674.70 -62.8 -60.8 -63.2 62 -99 SPO 1997 04 27 20 00 47 6.2 -9 674.60 -62.7 -60.8 -63.2 62 0 SPO 1997 04 27 20 01 48 6.2 -9 674.70 -62.7 -60.8 -63.1 65 -99 SPO 1997 04 27 20 02 49 6.5 -9 674.70 -62.7 -60.8 -63.1 65 -99 SPO 1997 04 27 20 03 48 6.6 -9 674.60 -62.6 -60.7 -63.0 65 -99 SPO 1997 04 27 20 04 49 6.4 -9 674.60 -62.6 -60.7 -62.9 65 -99 SPO 1997 04 27 20 05 50 6.6 -9 674.60 -62.6 -60.6 -62.9 66 -99 SPO 1997 04 27 20 06 49 6.4 -9 674.60 -62.6 -60.6 -62.9 66 -99 SPO 1997 04 27 20 07 49 6.5 -9 674.60 -62.5 -60.5 -62.8 67 -99 SPO 1997 04 27 20 08 49 6.5 -9 674.60 -62.5 -60.5 -62.8 67 -99 SPO 1997 04 27 20 09 49 6.5 -9 674.60 -62.5 -60.6 -62.8 68 -99 SPO 1997 04 27 20 10 48 6.4 -9 674.60 -62.5 -60.6 -62.8 68 -99 SPO 1997 04 27 20 11 48 6.3 -9 674.60 -62.5 -60.7 -62.7 68 -99 SPO 1997 04 27 20 12 48 6.2 -9 674.60 -62.5 -60.7 -62.7 68 -99 SPO 1997 04 27 20 13 48 6.3 -9 674.60 -62.5 -60.7 -62.8 68 -99 SPO 1997 04 27 20 14 47 6.4 -9 674.70 -62.6 -60.7 -62.8 69 -99 SPO 1997 04 27 20 15 47 6.3 -9 674.70 -62.6 -60.7 -62.7 69 -99 SPO 1997 04 27 20 16 49 6.2 -9 674.70 -62.6 -60.7 -62.7 70 -99 SPO 1997 04 27 20 17 48 6.2 -9 674.70 -62.5 -60.7 -62.7 69 -99 SPO 1997 04 27 20 18 48 6.1 -9 674.70 -62.6 -60.8 -62.7 69 -99 SPO 1997 04 27 20 19 49 5.8 -9 674.70 -62.7 -60.8 -62.8 71 -99 SPO 1997 04 27 20 20 51 5.6 -9 674.70 -62.8 -60.8 -62.9 71 -99 SPO 1997 04 27 20 21 51 5.4 -9 674.70 -63.0 -60.9 -63.0 73 -99 SPO 1997 04 27 20 22 52 5.3 -9 674.70 -63.2 -61.0 -63.2 72 -99 SPO 1997 04 27 20 23 53 4.7 -9 674.70 -63.4 -61.0 -63.3 72 -99 SPO 1997 04 27 20 24 53 5.0 -9 674.70 -63.7 -61.1 -63.6 73 -99 SPO 1997 04 27 20 25 54 5.2 -9 674.70 -64.0 -61.2 -63.8 72 -99 SPO 1997 04 27 20 26 54 5.4 -9 674.70 -64.3 -61.2 -64.0 75 -99 SPO 1997 04 27 20 27 54 5.7 -9 674.70 -64.4 -61.2 -64.1 73 -99 SPO 1997 04 27 20 28 54 5.8 -9 674.70 -64.5 -61.2 -64.2 73 -99 SPO 1997 04 27 20 29 54 5.9 -9 674.70 -64.5 -61.1 -64.2 72 -99 SPO 1997 04 27 20 30 55 6.0 -9 674.70 -64.6 -61.0 -64.2 73 -99 SPO 1997 04 27 20 31 54 6.1 -9 674.70 -64.5 -61.0 -64.2 72 -99 SPO 1997 04 27 20 32 55 6.2 -9 674.70 -64.5 -61.0 -64.2 69 -99 SPO 1997 04 27 20 33 56 6.3 -9 674.70 -64.4 -61.0 -64.2 68 -99 SPO 1997 04 27 20 34 56 6.3 -9 674.70 -64.4 -61.0 -64.2 68 -99 SPO 1997 04 27 20 35 55 6.4 -9 674.70 -64.4 -61.0 -64.2 68 -99 SPO 1997 04 27 20 36 56 6.5 -9 674.70 -64.4 -60.9 -64.3 67 -99 SPO 1997 04 27 20 37 56 6.5 -9 674.70 -64.5 -60.9 -64.3 68 -99 SPO 1997 04 27 20 38 56 6.5 -9 674.70 -64.4 -60.9 -64.4 68 -99 SPO 1997 04 27 20 39 56 6.4 -9 674.70 -64.4 -60.9 -64.3 67 -99 SPO 1997 04 27 20 40 56 6.3 -9 674.60 -64.4 -60.9 -64.3 67 -99 SPO 1997 04 27 20 41 57 6.4 -9 674.60 -64.4 -60.9 -64.4 68 -99 SPO 1997 04 27 20 42 56 6.3 -9 674.70 -64.4 -60.9 -64.4 69 -99 SPO 1997 04 27 20 43 56 6.4 -9 674.70 -64.4 -61.0 -64.4 68 -99 SPO 1997 04 27 20 44 56 6.3 -9 674.70 -64.4 -61.0 -64.3 68 -99 SPO 1997 04 27 20 45 55 6.2 -9 674.60 -64.3 -61.0 -64.3 66 -99 SPO 1997 04 27 20 46 55 6.1 -9 674.70 -64.4 -61.0 -64.4 67 -99 SPO 1997 04 27 20 47 54 6.1 -9 674.70 -64.4 -61.0 -64.4 67 -99 SPO 1997 04 27 20 48 54 5.9 -9 674.70 -64.4 -61.0 -64.5 67 -99 SPO 1997 04 27 20 49 54 5.9 -9 674.70 -64.5 -61.0 -64.5 68 -99 SPO 1997 04 27 20 50 54 5.8 -9 674.70 -64.6 -61.0 -64.6 69 -99 SPO 1997 04 27 20 51 54 5.9 -9 674.70 -64.7 -61.0 -64.6 69 -99 SPO 1997 04 27 20 52 53 5.8 -9 674.70 -64.8 -60.9 -64.7 69 -99 SPO 1997 04 27 20 53 53 5.6 -9 674.70 -64.8 -61.0 -64.8 69 -99 SPO 1997 04 27 20 54 53 5.4 -9 674.70 -65.0 -61.0 -64.8 69 -99 SPO 1997 04 27 20 55 53 5.4 -9 674.70 -65.1 -61.0 -64.9 69 -99 SPO 1997 04 27 20 56 53 5.3 -9 674.70 -65.2 -61.1 -65.0 69 -99 SPO 1997 04 27 20 57 54 5.3 -9 674.70 -65.3 -61.1 -65.1 69 -99 SPO 1997 04 27 20 58 54 5.5 -9 674.70 -65.3 -61.1 -65.1 68 -99 SPO 1997 04 27 20 59 53 5.6 -9 674.70 -65.3 -61.0 -65.1 68 -99 SPO 1997 04 27 21 00 54 5.7 -9 674.70 -65.1 -61.0 -65.0 66 0 SPO 1997 04 27 21 01 54 5.7 -9 674.60 -64.9 -61.0 -64.9 64 -99 SPO 1997 04 27 21 02 52 5.7 -9 674.70 -64.7 -61.0 -64.8 64 -99 SPO 1997 04 27 21 03 52 5.6 -9 674.70 -64.6 -61.0 -64.7 64 -99 SPO 1997 04 27 21 04 53 5.7 -9 674.70 -64.5 -60.9 -64.6 63 -99 SPO 1997 04 27 21 05 53 5.7 -9 674.70 -64.5 -60.8 -64.6 63 -99 SPO 1997 04 27 21 06 53 5.8 -9 674.70 -64.5 -60.8 -64.6 63 -99 SPO 1997 04 27 21 07 54 5.8 -9 674.60 -64.4 -60.7 -64.6 63 -99 SPO 1997 04 27 21 08 54 5.8 -9 674.60 -64.4 -60.7 -64.5 63 -99 SPO 1997 04 27 21 09 54 6.0 -9 674.70 -64.3 -60.8 -64.5 63 -99 SPO 1997 04 27 21 10 54 5.9 -9 674.60 -64.4 -60.8 -64.5 63 -99 SPO 1997 04 27 21 11 54 5.5 -9 674.60 -64.4 -61.0 -64.5 64 -99 SPO 1997 04 27 21 12 54 5.5 -9 674.70 -64.6 -61.1 -64.6 68 -99 SPO 1997 04 27 21 13 56 5.2 -9 674.70 -64.6 -61.0 -64.7 68 -99 SPO 1997 04 27 21 14 56 5.3 -9 674.70 -64.8 -61.0 -64.8 69 -99 SPO 1997 04 27 21 15 55 5.3 -9 674.70 -64.9 -61.0 -64.9 69 -99 SPO 1997 04 27 21 16 56 5.2 -9 674.70 -65.0 -61.0 -65.0 69 -99 SPO 1997 04 27 21 17 56 5.4 -9 674.70 -65.0 -61.0 -65.0 68 -99 SPO 1997 04 27 21 18 55 5.6 -9 674.70 -64.8 -60.8 -64.8 66 -99 SPO 1997 04 27 21 19 55 5.8 -9 674.60 -64.6 -60.7 -64.6 64 -99 SPO 1997 04 27 21 20 55 5.9 -9 674.60 -64.3 -60.6 -64.4 62 -99 SPO 1997 04 27 21 21 55 5.7 -9 674.60 -64.2 -60.5 -64.4 62 -99 SPO 1997 04 27 21 22 56 5.7 -9 674.60 -64.1 -60.6 -64.3 61 -99 SPO 1997 04 27 21 23 56 5.7 -9 674.60 -64.1 -60.6 -64.3 63 -99 SPO 1997 04 27 21 24 58 5.7 -9 674.60 -64.1 -60.6 -64.3 64 -99 SPO 1997 04 27 21 25 59 5.7 -9 674.60 -64.2 -60.6 -64.4 65 -99 SPO 1997 04 27 21 26 60 5.5 -9 674.60 -64.2 -60.6 -64.4 65 -99 SPO 1997 04 27 21 27 61 5.6 -9 674.60 -64.3 -60.6 -64.5 66 -99 SPO 1997 04 27 21 28 60 5.5 -9 674.60 -64.4 -60.6 -64.6 66 -99 SPO 1997 04 27 21 29 60 5.6 -9 674.70 -64.5 -60.6 -64.6 67 -99 SPO 1997 04 27 21 30 60 5.5 -9 674.70 -64.5 -60.7 -64.6 67 -99 SPO 1997 04 27 21 31 59 5.5 -9 674.70 -64.5 -60.7 -64.6 65 -99 SPO 1997 04 27 21 32 58 5.6 -9 674.70 -64.5 -60.7 -64.6 64 -99 SPO 1997 04 27 21 33 58 5.4 -9 674.70 -64.5 -60.7 -64.6 65 -99 SPO 1997 04 27 21 34 58 5.5 -9 674.70 -64.5 -60.7 -64.6 65 -99 SPO 1997 04 27 21 35 58 5.5 -9 674.70 -64.5 -60.7 -64.6 65 -99 SPO 1997 04 27 21 36 58 5.6 -9 674.70 -64.6 -60.7 -64.7 68 -99 SPO 1997 04 27 21 37 57 5.7 -9 674.70 -64.6 -60.8 -64.7 66 -99 SPO 1997 04 27 21 38 58 5.7 -9 674.70 -64.6 -60.8 -64.7 65 -99 SPO 1997 04 27 21 39 59 5.8 -9 674.70 -64.6 -60.9 -64.7 66 -99 SPO 1997 04 27 21 40 60 5.7 -9 674.70 -64.7 -61.0 -64.7 66 -99 SPO 1997 04 27 21 41 59 5.8 -9 674.70 -64.6 -61.0 -64.7 65 -99 SPO 1997 04 27 21 42 59 5.8 -9 674.70 -64.6 -61.1 -64.7 65 -99 SPO 1997 04 27 21 43 59 5.8 -9 674.70 -64.6 -61.1 -64.7 65 -99 SPO 1997 04 27 21 44 60 5.9 -9 674.70 -64.6 -61.1 -64.7 65 -99 SPO 1997 04 27 21 45 59 5.9 -9 674.70 -64.6 -61.0 -64.7 65 -99 SPO 1997 04 27 21 46 59 6.1 -9 674.70 -64.6 -61.0 -64.7 65 -99 SPO 1997 04 27 21 47 58 6.2 -9 674.70 -64.5 -60.8 -64.7 65 -99 SPO 1997 04 27 21 48 58 6.3 -9 674.70 -64.6 -60.9 -64.6 66 -99 SPO 1997 04 27 21 49 59 6.4 -9 674.70 -64.6 -60.9 -64.6 66 -99 SPO 1997 04 27 21 50 58 6.3 -9 674.70 -64.6 -61.0 -64.7 65 -99 SPO 1997 04 27 21 51 60 6.2 -9 674.70 -64.6 -61.0 -64.7 65 -99 SPO 1997 04 27 21 52 60 6.2 -9 674.70 -64.7 -60.9 -64.7 65 -99 SPO 1997 04 27 21 53 61 6.0 -9 674.70 -64.7 -60.9 -64.8 65 -99 SPO 1997 04 27 21 54 61 6.1 -9 674.70 -64.8 -61.0 -64.8 66 -99 SPO 1997 04 27 21 55 61 6.1 -9 674.70 -64.8 -61.1 -64.8 66 -99 SPO 1997 04 27 21 56 61 6.1 -9 674.70 -64.8 -61.0 -64.8 66 -99 SPO 1997 04 27 21 57 61 6.0 -9 674.70 -64.8 -61.0 -64.9 66 -99 SPO 1997 04 27 21 58 61 6.1 -9 674.70 -64.8 -61.0 -64.9 66 -99 SPO 1997 04 27 21 59 58 6.3 -9 674.70 -64.9 -60.9 -64.9 67 -99 SPO 1997 04 27 22 00 58 6.4 -9 674.70 -64.8 -60.8 -64.9 66 0 SPO 1997 04 27 22 01 58 6.4 -9 674.70 -64.8 -60.7 -64.9 66 -99 SPO 1997 04 27 22 02 58 6.5 -9 674.70 -64.8 -60.6 -64.9 66 -99 SPO 1997 04 27 22 03 58 6.5 -9 674.70 -64.7 -60.7 -64.8 65 -99 SPO 1997 04 27 22 04 58 6.4 -9 674.70 -64.6 -60.8 -64.7 63 -99 SPO 1997 04 27 22 05 59 6.2 -9 674.70 -64.6 -60.8 -64.7 63 -99 SPO 1997 04 27 22 06 59 6.3 -9 674.70 -64.6 -60.6 -64.8 63 -99 SPO 1997 04 27 22 07 60 6.2 -9 674.60 -64.7 -60.6 -64.8 62 -99 SPO 1997 04 27 22 08 60 6.2 -9 674.60 -64.7 -60.6 -64.8 62 -99 SPO 1997 04 27 22 09 60 6.3 -9 674.60 -64.8 -60.6 -64.8 65 -99 SPO 1997 04 27 22 10 60 6.4 -9 674.60 -64.8 -60.6 -64.9 65 -99 SPO 1997 04 27 22 11 59 6.5 -9 674.60 -64.8 -60.6 -64.9 66 -99 SPO 1997 04 27 22 12 59 6.7 -9 674.60 -64.7 -60.6 -64.9 65 -99 SPO 1997 04 27 22 13 59 6.6 -9 674.60 -64.8 -60.5 -64.9 66 -99 SPO 1997 04 27 22 14 60 6.5 -9 674.60 -64.8 -60.5 -64.9 65 -99 SPO 1997 04 27 22 15 59 6.6 -9 674.60 -64.8 -60.4 -64.9 65 -99 SPO 1997 04 27 22 16 60 6.5 -9 674.60 -64.8 -60.4 -64.9 65 -99 SPO 1997 04 27 22 17 59 6.7 -9 674.60 -64.8 -60.4 -64.9 63 -99 SPO 1997 04 27 22 18 59 6.6 -9 674.60 -64.8 -60.4 -64.9 63 -99 SPO 1997 04 27 22 19 60 6.7 -9 674.60 -64.8 -60.4 -64.9 63 -99 SPO 1997 04 27 22 20 62 6.5 -9 674.50 -64.9 -60.3 -64.9 64 -99 SPO 1997 04 27 22 21 64 6.6 -9 674.50 -65.0 -60.3 -65.0 65 -99 SPO 1997 04 27 22 22 63 6.8 -9 674.50 -65.0 -60.4 -65.0 65 -99 SPO 1997 04 27 22 23 64 6.8 -9 674.50 -65.0 -60.4 -65.1 64 -99 SPO 1997 04 27 22 24 65 6.7 -9 674.50 -65.1 -60.6 -65.1 65 -99 SPO 1997 04 27 22 25 65 6.6 -9 674.50 -65.2 -60.8 -65.2 65 -99 SPO 1997 04 27 22 26 66 6.5 -9 674.50 -65.2 -60.8 -65.2 65 -99 SPO 1997 04 27 22 27 68 6.5 -9 674.50 -65.3 -60.8 -65.3 66 -99 SPO 1997 04 27 22 28 68 6.0 -9 674.50 -65.4 -60.9 -65.4 66 -99 SPO 1997 04 27 22 29 69 6.0 -9 674.50 -65.6 -60.9 -65.5 66 -99 SPO 1997 04 27 22 30 68 6.2 -9 674.50 -65.6 -60.9 -65.6 65 -99 SPO 1997 04 27 22 31 69 6.4 -9 674.50 -65.6 -60.9 -65.6 65 -99 SPO 1997 04 27 22 32 68 6.2 -9 674.40 -65.6 -60.8 -65.6 65 -99 SPO 1997 04 27 22 33 68 6.0 -9 674.50 -65.6 -60.7 -65.5 64 -99 SPO 1997 04 27 22 34 68 6.1 -9 674.50 -65.6 -60.7 -65.6 65 -99 SPO 1997 04 27 22 35 68 6.2 -9 674.50 -65.7 -60.7 -65.6 66 -99 SPO 1997 04 27 22 36 67 6.2 -9 674.50 -65.7 -60.8 -65.6 65 -99 SPO 1997 04 27 22 37 67 6.4 -9 674.50 -65.7 -60.8 -65.7 65 -99 SPO 1997 04 27 22 38 67 6.5 -9 674.50 -65.7 -60.5 -65.7 64 -99 SPO 1997 04 27 22 39 65 6.3 -9 674.40 -65.7 -60.4 -65.7 64 -99 SPO 1997 04 27 22 40 65 6.4 -9 674.50 -65.7 -60.4 -65.7 62 -99 SPO 1997 04 27 22 41 65 6.3 -9 674.50 -65.7 -60.4 -65.7 62 -99 SPO 1997 04 27 22 42 65 6.1 -9 674.40 -65.7 -60.7 -65.8 62 -99 SPO 1997 04 27 22 43 64 6.5 -9 674.40 -65.8 -60.8 -65.8 63 -99 SPO 1997 04 27 22 44 65 6.2 -9 674.40 -65.7 -60.8 -65.7 64 -99 SPO 1997 04 27 22 45 64 5.8 -9 674.40 -65.7 -61.0 -65.7 64 -99 SPO 1997 04 27 22 46 62 5.8 -9 674.40 -65.7 -61.1 -65.8 64 -99 SPO 1997 04 27 22 47 63 6.0 -9 674.40 -65.6 -61.0 -65.7 64 -99 SPO 1997 04 27 22 48 64 6.1 -9 674.40 -65.6 -60.8 -65.6 64 -99 SPO 1997 04 27 22 49 65 6.1 -9 674.40 -65.4 -60.6 -65.5 62 -99 SPO 1997 04 27 22 50 64 6.1 -9 674.40 -65.2 -60.6 -65.4 61 -99 SPO 1997 04 27 22 51 65 6.0 -9 674.40 -65.0 -60.6 -65.2 59 -99 SPO 1997 04 27 22 52 66 6.0 -9 674.40 -64.8 -60.8 -65.1 58 -99 SPO 1997 04 27 22 53 66 5.8 -9 674.40 -64.7 -60.9 -65.0 58 -99 SPO 1997 04 27 22 54 66 6.0 -9 674.40 -64.6 -61.0 -65.0 59 -99 SPO 1997 04 27 22 55 66 6.1 -9 674.40 -64.5 -61.0 -64.9 59 -99 SPO 1997 04 27 22 56 67 6.2 -9 674.40 -64.5 -60.9 -64.8 61 -99 SPO 1997 04 27 22 57 65 6.2 -9 674.40 -64.4 -60.9 -64.8 62 -99 SPO 1997 04 27 22 58 64 6.2 -9 674.40 -64.4 -61.0 -64.8 63 -99 SPO 1997 04 27 22 59 64 6.0 -9 674.40 -64.4 -61.0 -64.7 63 -99 SPO 1997 04 27 23 00 64 6.1 -9 674.40 -64.4 -61.0 -64.7 63 0 SPO 1997 04 27 23 01 63 5.8 -9 674.40 -64.3 -61.0 -64.6 63 -99 SPO 1997 04 27 23 02 63 6.0 -9 674.50 -64.3 -61.2 -64.6 63 -99 SPO 1997 04 27 23 03 62 6.0 -9 674.50 -64.3 -61.0 -64.6 63 -99 SPO 1997 04 27 23 04 59 5.6 -9 674.50 -64.4 -61.0 -64.6 63 -99 SPO 1997 04 27 23 05 58 5.5 -9 674.50 -64.4 -61.1 -64.6 63 -99 SPO 1997 04 27 23 06 58 5.7 -9 674.50 -64.3 -61.3 -64.6 63 -99 SPO 1997 04 27 23 07 57 5.5 -9 674.50 -64.3 -61.4 -64.5 63 -99 SPO 1997 04 27 23 08 57 5.5 -9 674.50 -64.3 -61.5 -64.5 63 -99 SPO 1997 04 27 23 09 57 5.7 -9 674.50 -64.3 -61.4 -64.5 63 -99 SPO 1997 04 27 23 10 56 5.7 -9 674.50 -64.3 -61.4 -64.5 63 -99 SPO 1997 04 27 23 11 57 5.9 -9 674.50 -64.3 -61.2 -64.5 63 -99 SPO 1997 04 27 23 12 59 5.8 -9 674.50 -64.2 -61.1 -64.4 63 -99 SPO 1997 04 27 23 13 60 6.0 -9 674.50 -64.2 -60.8 -64.4 63 -99 SPO 1997 04 27 23 14 60 6.1 -9 674.50 -64.2 -60.8 -64.4 64 -99 SPO 1997 04 27 23 15 61 6.2 -9 674.50 -64.1 -60.7 -64.3 63 -99 SPO 1997 04 27 23 16 62 6.1 -9 674.50 -64.1 -60.8 -64.3 63 -99 SPO 1997 04 27 23 17 63 6.1 -9 674.60 -64.1 -60.9 -64.3 64 -99 SPO 1997 04 27 23 18 64 5.5 -9 674.60 -64.1 -61.0 -64.3 64 -99 SPO 1997 04 27 23 19 64 5.8 -9 674.60 -64.1 -61.1 -64.3 65 -99 SPO 1997 04 27 23 20 65 5.5 -9 674.60 -64.1 -61.1 -64.3 65 -99 SPO 1997 04 27 23 21 64 5.2 -9 674.60 -64.1 -61.2 -64.3 65 -99 SPO 1997 04 27 23 22 65 5.5 -9 674.60 -64.1 -61.2 -64.3 64 -99 SPO 1997 04 27 23 23 67 5.7 -9 674.60 -64.1 -61.1 -64.3 64 -99 SPO 1997 04 27 23 24 68 5.6 -9 674.60 -64.1 -60.9 -64.3 64 -99 SPO 1997 04 27 23 25 68 5.4 -9 674.60 -64.1 -61.1 -64.3 64 -99 SPO 1997 04 27 23 26 69 5.4 -9 674.60 -64.1 -61.2 -64.3 64 -99 SPO 1997 04 27 23 27 68 5.3 -9 674.60 -64.1 -61.4 -64.3 64 -99 SPO 1997 04 27 23 28 66 5.5 -9 674.60 -64.2 -61.4 -64.3 65 -99 SPO 1997 04 27 23 29 65 5.4 -9 674.60 -64.2 -61.3 -64.3 66 -99 SPO 1997 04 27 23 30 64 5.3 -9 674.60 -64.2 -61.2 -64.3 66 -99 SPO 1997 04 27 23 31 64 5.6 -9 674.60 -64.3 -61.1 -64.4 67 -99 SPO 1997 04 27 23 32 63 5.6 -9 674.60 -64.4 -61.0 -64.4 68 -99 SPO 1997 04 27 23 33 62 5.5 -9 674.60 -64.3 -60.9 -64.4 67 -99 SPO 1997 04 27 23 34 62 5.7 -9 674.60 -64.3 -60.9 -64.4 66 -99 SPO 1997 04 27 23 35 61 5.8 -9 674.50 -64.3 -60.8 -64.4 66 -99 SPO 1997 04 27 23 36 60 5.8 -9 674.50 -64.3 -60.8 -64.4 66 -99 SPO 1997 04 27 23 37 59 6.0 -9 674.50 -64.3 -60.8 -64.4 65 -99 SPO 1997 04 27 23 38 58 6.0 -9 674.60 -64.3 -60.7 -64.4 63 -99 SPO 1997 04 27 23 39 58 6.0 -9 674.50 -64.3 -60.8 -64.4 65 -99 SPO 1997 04 27 23 40 57 5.9 -9 674.50 -64.4 -60.8 -64.4 66 -99 SPO 1997 04 27 23 41 57 5.7 -9 674.50 -64.4 -60.8 -64.4 66 -99 SPO 1997 04 27 23 42 55 5.4 -9 674.50 -64.4 -60.9 -64.4 66 -99 SPO 1997 04 27 23 43 54 5.5 -9 674.50 -64.4 -60.6 -64.5 66 -99 SPO 1997 04 27 23 44 52 5.7 -9 674.50 -64.5 -60.2 -64.5 67 -99 SPO 1997 04 27 23 45 52 5.3 -9 674.50 -64.4 -60.2 -64.5 66 -99 SPO 1997 04 27 23 46 52 5.7 -9 674.50 -64.3 -60.2 -64.4 63 -99 SPO 1997 04 27 23 47 54 5.9 -9 674.50 -64.2 -60.0 -64.3 63 -99 SPO 1997 04 27 23 48 54 6.2 -9 674.50 -64.0 -59.8 -64.2 61 -99 SPO 1997 04 27 23 49 53 6.0 -9 674.50 -63.9 -59.7 -64.1 62 -99 SPO 1997 04 27 23 50 53 5.8 -9 674.50 -63.9 -59.8 -64.1 62 -99 SPO 1997 04 27 23 51 53 6.0 -9 674.50 -63.8 -59.7 -64.0 62 -99 SPO 1997 04 27 23 52 52 6.2 -9 674.50 -63.8 -59.7 -64.0 62 -99 SPO 1997 04 27 23 53 52 6.3 -9 674.50 -63.7 -59.6 -64.0 61 -99 SPO 1997 04 27 23 54 53 6.1 -9 674.50 -63.7 -59.6 -63.9 63 -99 SPO 1997 04 27 23 55 53 5.8 -9 674.50 -63.7 -59.6 -63.9 64 -99 SPO 1997 04 27 23 56 54 5.7 -9 674.50 -63.6 -59.7 -63.8 64 -99 SPO 1997 04 27 23 57 53 5.5 -9 674.50 -63.5 -59.8 -63.8 -99 -99 SPO 1997 04 27 23 58 53 5.4 -9 674.50 -63.4 -59.9 -63.7 -99 -99 SPO 1997 04 27 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 28 00 00 -999 -99.9 -9 674.60 -62.8 -60.0 -63.2 -99 0 SPO 1997 04 28 00 01 54 5.3 -9 674.60 -62.8 -60.0 -63.2 -99 -99 SPO 1997 04 28 00 02 56 5.1 -9 674.60 -62.7 -59.9 -63.1 -99 -99 SPO 1997 04 28 00 03 56 5.0 -9 674.60 -62.7 -59.9 -63.1 -99 -99 SPO 1997 04 28 00 04 58 5.1 -9 674.60 -62.7 -59.8 -63.1 -99 -99 SPO 1997 04 28 00 05 58 5.1 -9 674.60 -62.6 -59.9 -63.0 -99 -99 SPO 1997 04 28 00 06 59 4.8 -9 674.60 -62.7 -60.0 -63.1 -99 -99 SPO 1997 04 28 00 07 59 4.8 -9 674.60 -62.8 -60.0 -63.1 -99 -99 SPO 1997 04 28 00 08 56 4.9 -9 674.60 -62.8 -60.1 -63.2 -99 -99 SPO 1997 04 28 00 09 59 4.9 -9 674.60 -63.0 -60.2 -63.2 -99 -99 SPO 1997 04 28 00 10 59 5.2 -9 674.60 -63.2 -60.1 -63.4 -99 -99 SPO 1997 04 28 00 11 57 5.2 -9 674.60 -63.2 -60.0 -63.4 -99 -99 SPO 1997 04 28 00 12 58 5.5 -9 674.50 -63.2 -60.0 -63.4 -99 -99 SPO 1997 04 28 00 13 57 5.5 -9 674.50 -63.1 -60.0 -63.3 67 -99 SPO 1997 04 28 00 14 58 5.5 -9 674.50 -63.2 -60.0 -63.3 69 -99 SPO 1997 04 28 00 15 57 5.6 -9 674.50 -63.2 -60.0 -63.3 70 -99 SPO 1997 04 28 00 16 56 5.5 -9 674.50 -63.2 -60.0 -63.4 70 -99 SPO 1997 04 28 00 17 57 5.6 -9 674.50 -63.2 -60.0 -63.4 70 -99 SPO 1997 04 28 00 18 57 5.6 -9 674.50 -63.3 -59.9 -63.4 72 -99 SPO 1997 04 28 00 19 58 5.6 -9 674.50 -63.3 -60.0 -63.4 71 -99 SPO 1997 04 28 00 20 58 5.7 -9 674.40 -63.4 -60.0 -63.4 71 -99 SPO 1997 04 28 00 21 58 5.9 -9 674.40 -63.4 -59.9 -63.5 70 -99 SPO 1997 04 28 00 22 56 5.8 -9 674.40 -63.4 -59.8 -63.5 67 -99 SPO 1997 04 28 00 23 55 5.9 -9 674.40 -63.4 -59.7 -63.5 67 -99 SPO 1997 04 28 00 24 54 5.8 -9 674.40 -63.4 -59.6 -63.4 67 -99 SPO 1997 04 28 00 25 54 5.9 -9 674.40 -63.4 -59.6 -63.4 68 -99 SPO 1997 04 28 00 26 56 5.9 -9 674.40 -63.3 -59.5 -63.4 67 -99 SPO 1997 04 28 00 27 57 5.5 -9 674.40 -63.3 -59.6 -63.4 69 -99 SPO 1997 04 28 00 28 61 5.2 -9 674.40 -63.4 -59.8 -63.4 70 -99 SPO 1997 04 28 00 29 61 5.2 -9 674.40 -63.5 -59.9 -63.5 71 -99 SPO 1997 04 28 00 30 62 5.1 -9 674.40 -63.5 -60.0 -63.6 69 -99 SPO 1997 04 28 00 31 62 5.2 -9 674.40 -63.6 -60.0 -63.6 69 -99 SPO 1997 04 28 00 32 61 5.2 -9 674.40 -63.6 -60.0 -63.7 69 -99 SPO 1997 04 28 00 33 61 5.0 -9 674.40 -63.7 -60.1 -63.7 69 -99 SPO 1997 04 28 00 34 61 5.0 -9 674.40 -63.7 -60.1 -63.7 68 -99 SPO 1997 04 28 00 35 62 5.2 -9 674.40 -63.7 -60.2 -63.7 68 -99 SPO 1997 04 28 00 36 61 5.0 -9 674.40 -63.7 -60.1 -63.7 68 -99 SPO 1997 04 28 00 37 59 5.1 -9 674.40 -63.7 -60.0 -63.8 67 -99 SPO 1997 04 28 00 38 58 5.1 -9 674.40 -63.7 -60.0 -63.7 68 -99 SPO 1997 04 28 00 39 56 5.2 -9 674.30 -63.7 -59.9 -63.7 68 -99 SPO 1997 04 28 00 40 55 5.2 -9 674.30 -63.5 -59.9 -63.6 66 -99 SPO 1997 04 28 00 41 55 5.2 -9 674.30 -63.3 -59.9 -63.5 64 -99 SPO 1997 04 28 00 42 52 5.3 -9 674.30 -63.2 -59.8 -63.4 64 -99 SPO 1997 04 28 00 43 52 5.5 -9 674.30 -63.0 -59.8 -63.2 63 -99 SPO 1997 04 28 00 44 51 5.3 -9 674.30 -62.8 -59.7 -63.1 62 -99 SPO 1997 04 28 00 45 49 5.2 -9 674.30 -62.6 -59.6 -63.0 61 -99 SPO 1997 04 28 00 46 47 5.2 -9 674.40 -62.4 -59.6 -62.8 61 -99 SPO 1997 04 28 00 47 47 5.2 -9 674.40 -62.3 -59.5 -62.7 62 -99 SPO 1997 04 28 00 48 47 5.5 -9 674.30 -62.1 -59.4 -62.6 62 -99 SPO 1997 04 28 00 49 47 5.4 -9 674.40 -61.9 -59.3 -62.4 62 -99 SPO 1997 04 28 00 50 47 5.3 -9 674.40 -61.7 -59.3 -62.2 62 -99 SPO 1997 04 28 00 51 46 5.0 -9 674.40 -61.6 -59.4 -62.1 62 -99 SPO 1997 04 28 00 52 46 5.3 -9 674.40 -61.6 -59.4 -62.0 63 -99 SPO 1997 04 28 00 53 46 4.9 -9 674.40 -61.5 -59.4 -62.0 63 -99 SPO 1997 04 28 00 54 47 5.0 -9 674.40 -61.6 -59.6 -62.0 65 -99 SPO 1997 04 28 00 55 52 5.1 -9 674.40 -61.6 -59.5 -62.0 66 -99 SPO 1997 04 28 00 56 51 4.8 -9 674.40 -61.7 -59.6 -62.1 67 -99 SPO 1997 04 28 00 57 52 4.7 -9 674.40 -61.8 -59.6 -62.2 67 -99 SPO 1997 04 28 00 58 51 4.9 -9 674.40 -62.0 -59.5 -62.2 69 -99 SPO 1997 04 28 00 59 51 4.8 -9 674.40 -62.0 -59.5 -62.3 70 -99 SPO 1997 04 28 01 00 50 5.0 -9 674.40 -62.2 -59.4 -62.3 71 0 SPO 1997 04 28 01 01 48 5.3 -9 674.40 -62.2 -59.3 -62.4 71 -99 SPO 1997 04 28 01 02 46 5.5 -9 674.40 -62.0 -59.2 -62.3 69 -99 SPO 1997 04 28 01 03 46 5.6 -9 674.40 -61.9 -59.0 -62.2 68 -99 SPO 1997 04 28 01 04 43 5.6 -9 674.40 -61.7 -58.8 -62.0 67 -99 SPO 1997 04 28 01 05 43 5.9 -9 674.30 -61.4 -58.6 -61.7 65 -99 SPO 1997 04 28 01 06 43 5.8 -9 674.30 -61.0 -58.4 -61.4 63 -99 SPO 1997 04 28 01 07 44 5.8 -9 674.30 -60.7 -58.3 -61.1 61 -99 SPO 1997 04 28 01 08 44 6.1 -9 674.30 -60.4 -58.2 -60.9 61 -99 SPO 1997 04 28 01 09 43 5.9 -9 674.30 -60.2 -58.2 -60.6 62 -99 SPO 1997 04 28 01 10 43 5.9 -9 674.30 -60.0 -58.1 -60.5 64 -99 SPO 1997 04 28 01 11 43 6.0 -9 674.30 -59.9 -58.0 -60.4 64 -99 SPO 1997 04 28 01 12 42 6.6 -9 674.30 -59.8 -57.9 -60.3 65 -99 SPO 1997 04 28 01 13 43 6.5 -9 674.20 -59.6 -57.9 -60.0 65 -99 SPO 1997 04 28 01 14 41 7.0 -9 674.20 -59.4 -57.8 -59.9 65 -99 SPO 1997 04 28 01 15 39 7.1 -9 674.20 -59.3 -57.6 -59.8 65 -99 SPO 1997 04 28 01 16 38 7.1 -9 674.20 -59.1 -57.4 -59.6 65 -99 SPO 1997 04 28 01 17 36 7.4 -9 674.20 -58.9 -57.4 -59.4 65 -99 SPO 1997 04 28 01 18 34 8.0 -9 674.20 -58.6 -57.2 -59.0 64 -99 SPO 1997 04 28 01 19 35 8.0 -9 674.10 -58.3 -56.9 -58.6 63 -99 SPO 1997 04 28 01 20 35 8.3 -9 674.10 -58.2 -56.9 -58.6 64 -99 SPO 1997 04 28 01 21 35 8.2 -9 674.10 -58.2 -56.9 -58.6 66 -99 SPO 1997 04 28 01 22 38 7.8 -9 674.10 -58.2 -56.8 -58.6 68 -99 SPO 1997 04 28 01 23 38 7.7 -9 674.10 -58.2 -56.9 -58.7 69 -99 SPO 1997 04 28 01 24 38 7.5 -9 674.10 -58.4 -57.1 -58.8 72 -99 SPO 1997 04 28 01 25 38 7.4 -9 674.10 -58.5 -57.1 -58.8 72 -99 SPO 1997 04 28 01 26 38 7.4 -9 674.10 -58.5 -57.1 -58.8 72 -99 SPO 1997 04 28 01 27 41 7.3 -9 674.10 -58.6 -57.2 -58.8 73 -99 SPO 1997 04 28 01 28 41 7.0 -9 674.10 -58.6 -57.2 -58.8 73 -99 SPO 1997 04 28 01 29 41 7.0 -9 674.10 -58.7 -57.3 -58.9 74 -99 SPO 1997 04 28 01 30 41 7.3 -9 674.10 -58.8 -57.2 -58.9 74 -99 SPO 1997 04 28 01 31 41 7.5 -9 674.10 -58.7 -57.2 -58.8 73 -99 SPO 1997 04 28 01 32 39 7.1 -9 674.10 -58.7 -57.2 -58.8 73 -99 SPO 1997 04 28 01 33 38 7.1 -9 674.10 -58.6 -57.2 -58.8 73 -99 SPO 1997 04 28 01 34 38 7.2 -9 674.10 -58.6 -57.0 -58.8 73 -99 SPO 1997 04 28 01 35 38 7.6 -9 674.10 -58.6 -57.0 -58.7 74 -99 SPO 1997 04 28 01 36 38 7.7 -9 674.00 -58.4 -56.8 -58.6 72 -99 SPO 1997 04 28 01 37 38 8.0 -9 674.00 -58.4 -56.8 -58.5 73 -99 SPO 1997 04 28 01 38 39 7.7 -9 674.00 -58.3 -56.8 -58.5 72 -99 SPO 1997 04 28 01 39 39 7.6 -9 674.00 -58.4 -56.8 -58.5 72 -99 SPO 1997 04 28 01 40 39 7.6 -9 674.00 -58.4 -56.9 -58.5 72 -99 SPO 1997 04 28 01 41 41 7.6 -9 674.00 -58.4 -56.9 -58.6 72 -99 SPO 1997 04 28 01 42 41 7.4 -9 674.00 -58.4 -57.0 -58.6 72 -99 SPO 1997 04 28 01 43 41 7.6 -9 674.00 -58.5 -57.0 -58.6 73 -99 SPO 1997 04 28 01 44 41 7.8 -9 674.00 -58.6 -57.0 -58.6 75 -99 SPO 1997 04 28 01 45 40 7.7 -9 674.00 -58.6 -57.0 -58.6 75 -99 SPO 1997 04 28 01 46 39 7.8 -9 674.00 -58.5 -57.0 -58.6 74 -99 SPO 1997 04 28 01 47 38 7.8 -9 674.00 -58.4 -56.8 -58.5 73 -99 SPO 1997 04 28 01 48 35 7.9 -9 674.00 -58.3 -56.7 -58.4 73 -99 SPO 1997 04 28 01 49 36 7.7 -9 674.00 -58.2 -56.6 -58.3 73 -99 SPO 1997 04 28 01 50 38 7.5 -9 674.00 -58.0 -56.6 -58.2 72 -99 SPO 1997 04 28 01 51 38 7.2 -9 674.00 -58.1 -56.7 -58.2 73 -99 SPO 1997 04 28 01 52 41 7.2 -9 674.00 -58.2 -56.8 -58.3 73 -99 SPO 1997 04 28 01 53 41 7.3 -9 674.00 -58.2 -56.9 -58.4 73 -99 SPO 1997 04 28 01 54 42 7.6 -9 674.00 -58.3 -56.9 -58.4 73 -99 SPO 1997 04 28 01 55 40 7.8 -9 674.00 -58.4 -56.9 -58.5 74 -99 SPO 1997 04 28 01 56 40 7.8 -9 674.00 -58.4 -56.9 -58.4 74 -99 SPO 1997 04 28 01 57 40 7.5 -9 674.00 -58.3 -57.0 -58.4 73 -99 SPO 1997 04 28 01 58 39 7.5 -9 674.00 -58.3 -57.0 -58.4 74 -99 SPO 1997 04 28 01 59 39 7.5 -9 674.00 -58.3 -57.0 -58.4 74 -99 SPO 1997 04 28 02 00 40 7.1 -9 674.10 -58.3 -57.0 -58.4 74 0 SPO 1997 04 28 02 01 40 7.3 -9 674.10 -58.3 -57.1 -58.3 73 -99 SPO 1997 04 28 02 02 40 7.5 -9 674.00 -58.3 -57.0 -58.4 73 -99 SPO 1997 04 28 02 03 38 7.3 -9 674.10 -58.3 -57.0 -58.4 73 -99 SPO 1997 04 28 02 04 37 7.4 -9 674.10 -58.3 -56.9 -58.4 73 -99 SPO 1997 04 28 02 05 37 7.7 -9 674.10 -58.2 -56.8 -58.3 72 -99 SPO 1997 04 28 02 06 39 7.5 -9 674.10 -58.1 -56.8 -58.2 72 -99 SPO 1997 04 28 02 07 40 7.1 -9 674.10 -58.2 -56.9 -58.2 73 -99 SPO 1997 04 28 02 08 40 7.1 -9 674.10 -58.2 -56.9 -58.3 73 -99 SPO 1997 04 28 02 09 43 6.8 -9 674.10 -58.2 -57.0 -58.3 73 -99 SPO 1997 04 28 02 10 44 6.9 -9 674.10 -58.3 -57.0 -58.3 74 -99 SPO 1997 04 28 02 11 43 6.9 -9 674.10 -58.3 -57.1 -58.4 74 -99 SPO 1997 04 28 02 12 43 7.1 -9 674.00 -58.3 -57.2 -58.4 73 -99 SPO 1997 04 28 02 13 42 6.9 -9 674.00 -58.3 -57.2 -58.4 73 -99 SPO 1997 04 28 02 14 43 6.8 -9 674.00 -58.4 -57.2 -58.4 73 -99 SPO 1997 04 28 02 15 43 7.2 -9 674.00 -58.4 -57.1 -58.5 73 -99 SPO 1997 04 28 02 16 43 7.8 -9 674.00 -58.4 -57.1 -58.5 72 -99 SPO 1997 04 28 02 17 44 7.8 -9 674.00 -58.4 -57.0 -58.4 72 -99 SPO 1997 04 28 02 18 42 8.0 -9 673.90 -58.3 -57.0 -58.4 72 -99 SPO 1997 04 28 02 19 43 7.8 -9 673.90 -58.3 -56.9 -58.4 73 -99 SPO 1997 04 28 02 20 43 7.5 -9 674.00 -58.3 -57.0 -58.4 73 -99 SPO 1997 04 28 02 21 43 7.4 -9 674.00 -58.3 -57.1 -58.3 74 -99 SPO 1997 04 28 02 22 44 7.3 -9 674.00 -58.3 -57.1 -58.4 74 -99 SPO 1997 04 28 02 23 45 7.5 -9 673.90 -58.3 -57.2 -58.4 74 -99 SPO 1997 04 28 02 24 45 7.7 -9 673.90 -58.2 -57.2 -58.3 73 -99 SPO 1997 04 28 02 25 46 7.7 -9 673.90 -58.2 -57.1 -58.3 73 -99 SPO 1997 04 28 02 26 46 7.5 -9 673.90 -58.2 -57.1 -58.3 73 -99 SPO 1997 04 28 02 27 45 7.9 -9 673.90 -58.2 -57.1 -58.3 72 -99 SPO 1997 04 28 02 28 45 7.5 -9 673.90 -58.1 -57.1 -58.2 72 -99 SPO 1997 04 28 02 29 46 7.6 -9 673.90 -58.1 -57.1 -58.2 73 -99 SPO 1997 04 28 02 30 43 8.0 -9 673.80 -58.0 -57.0 -58.1 72 -99 SPO 1997 04 28 02 31 43 8.0 -9 673.80 -57.9 -57.0 -58.1 72 -99 SPO 1997 04 28 02 32 42 8.3 -9 673.80 -57.8 -56.9 -58.0 72 -99 SPO 1997 04 28 02 33 42 8.4 -9 673.80 -57.8 -56.9 -57.9 73 -99 SPO 1997 04 28 02 34 42 8.3 -9 673.80 -57.8 -56.8 -57.9 73 -99 SPO 1997 04 28 02 35 42 8.4 -9 673.80 -57.8 -56.8 -57.9 73 -99 SPO 1997 04 28 02 36 42 8.4 -9 673.80 -57.8 -56.7 -57.9 73 -99 SPO 1997 04 28 02 37 42 8.5 -9 673.70 -57.7 -56.6 -57.9 71 -99 SPO 1997 04 28 02 38 43 8.7 -9 673.70 -57.7 -56.5 -57.8 72 -99 SPO 1997 04 28 02 39 43 8.5 -9 673.70 -57.7 -56.5 -57.8 72 -99 SPO 1997 04 28 02 40 43 8.2 -9 673.70 -57.7 -56.5 -57.8 73 -99 SPO 1997 04 28 02 41 43 8.3 -9 673.70 -57.7 -56.6 -57.8 73 -99 SPO 1997 04 28 02 42 45 8.1 -9 673.80 -57.7 -56.6 -57.8 73 -99 SPO 1997 04 28 02 43 46 8.2 -9 673.80 -57.7 -56.7 -57.8 73 -99 SPO 1997 04 28 02 44 46 8.0 -9 673.70 -57.7 -56.8 -57.8 73 -99 SPO 1997 04 28 02 45 46 7.5 -9 673.70 -57.8 -56.9 -57.9 74 -99 SPO 1997 04 28 02 46 47 7.8 -9 673.70 -57.9 -56.9 -58.0 73 -99 SPO 1997 04 28 02 47 48 7.8 -9 673.70 -57.9 -57.0 -58.0 73 -99 SPO 1997 04 28 02 48 47 8.0 -9 673.70 -57.9 -57.0 -58.0 73 -99 SPO 1997 04 28 02 49 46 7.8 -9 673.70 -58.0 -57.0 -58.0 73 -99 SPO 1997 04 28 02 50 45 8.2 -9 673.70 -58.0 -57.0 -58.1 73 -99 SPO 1997 04 28 02 51 47 8.3 -9 673.70 -58.1 -56.9 -58.1 73 -99 SPO 1997 04 28 02 52 46 8.1 -9 673.70 -58.1 -56.9 -58.1 73 -99 SPO 1997 04 28 02 53 45 8.2 -9 673.60 -58.1 -56.9 -58.2 73 -99 SPO 1997 04 28 02 54 46 8.6 -9 673.60 -58.2 -56.9 -58.2 74 -99 SPO 1997 04 28 02 55 45 8.8 -9 673.60 -58.2 -56.9 -58.2 73 -99 SPO 1997 04 28 02 56 44 8.7 -9 673.60 -58.2 -56.9 -58.2 73 -99 SPO 1997 04 28 02 57 45 9.1 -9 673.60 -58.2 -56.8 -58.2 73 -99 SPO 1997 04 28 02 58 45 9.5 -9 673.50 -58.1 -56.6 -58.1 73 -99 SPO 1997 04 28 02 59 44 9.1 -9 673.60 -58.1 -56.6 -58.1 72 -99 SPO 1997 04 28 03 00 43 8.6 -9 673.60 -58.1 -56.6 -58.2 72 0 SPO 1997 04 28 03 01 43 8.2 -9 673.60 -58.2 -56.8 -58.2 73 -99 SPO 1997 04 28 03 02 43 8.8 -9 673.60 -58.2 -56.9 -58.3 73 -99 SPO 1997 04 28 03 03 43 8.4 -9 673.60 -58.2 -56.9 -58.3 73 -99 SPO 1997 04 28 03 04 43 8.5 -9 673.60 -58.2 -56.9 -58.3 73 -99 SPO 1997 04 28 03 05 43 8.6 -9 673.60 -58.2 -56.8 -58.3 73 -99 SPO 1997 04 28 03 06 42 8.7 -9 673.60 -58.2 -56.8 -58.3 73 -99 SPO 1997 04 28 03 07 42 8.5 -9 673.60 -58.2 -56.7 -58.3 73 -99 SPO 1997 04 28 03 08 42 8.5 -9 673.60 -58.2 -56.7 -58.2 73 -99 SPO 1997 04 28 03 09 41 8.8 -9 673.60 -58.2 -56.6 -58.3 72 -99 SPO 1997 04 28 03 10 41 8.8 -9 673.60 -58.2 -56.5 -58.2 72 -99 SPO 1997 04 28 03 11 40 9.3 -9 673.60 -58.2 -56.4 -58.2 72 -99 SPO 1997 04 28 03 12 41 8.9 -9 673.60 -58.1 -56.4 -58.2 71 -99 SPO 1997 04 28 03 13 41 8.8 -9 673.60 -58.1 -56.3 -58.2 71 -99 SPO 1997 04 28 03 14 40 8.7 -9 673.60 -58.0 -56.4 -58.1 71 -99 SPO 1997 04 28 03 15 41 8.7 -9 673.60 -58.0 -56.4 -58.1 71 -99 SPO 1997 04 28 03 16 39 9.1 -9 673.50 -58.0 -56.2 -58.1 71 -99 SPO 1997 04 28 03 17 39 9.2 -9 673.50 -58.0 -56.2 -58.0 72 -99 SPO 1997 04 28 03 18 38 8.4 -9 673.60 -57.9 -56.2 -58.0 71 -99 SPO 1997 04 28 03 19 38 8.6 -9 673.50 -57.9 -56.3 -58.0 71 -99 SPO 1997 04 28 03 20 37 8.6 -9 673.50 -57.9 -56.3 -58.0 71 -99 SPO 1997 04 28 03 21 38 8.9 -9 673.50 -57.9 -56.3 -58.0 71 -99 SPO 1997 04 28 03 22 39 8.7 -9 673.50 -58.0 -56.2 -58.0 72 -99 SPO 1997 04 28 03 23 39 8.5 -9 673.50 -58.0 -56.2 -58.0 72 -99 SPO 1997 04 28 03 24 39 8.8 -9 673.50 -57.9 -56.2 -58.0 71 -99 SPO 1997 04 28 03 25 38 8.8 -9 673.50 -57.9 -56.1 -58.0 71 -99 SPO 1997 04 28 03 26 37 8.7 -9 673.50 -57.8 -56.1 -57.9 70 -99 SPO 1997 04 28 03 27 37 8.3 -9 673.60 -57.8 -56.1 -57.8 70 -99 SPO 1997 04 28 03 28 38 8.1 -9 673.50 -57.8 -56.1 -57.9 71 -99 SPO 1997 04 28 03 29 36 8.0 -9 673.60 -57.8 -56.2 -57.8 71 -99 SPO 1997 04 28 03 30 38 8.1 -9 673.60 -57.8 -56.2 -57.8 71 -99 SPO 1997 04 28 03 31 38 8.9 -9 673.50 -57.8 -56.1 -57.9 71 -99 SPO 1997 04 28 03 32 37 8.8 -9 673.50 -57.8 -56.0 -57.9 71 -99 SPO 1997 04 28 03 33 38 9.0 -9 673.50 -57.7 -56.0 -57.8 70 -99 SPO 1997 04 28 03 34 37 9.2 -9 673.40 -57.7 -56.0 -57.8 71 -99 SPO 1997 04 28 03 35 38 8.5 -9 673.40 -57.7 -56.0 -57.8 71 -99 SPO 1997 04 28 03 36 39 8.9 -9 673.40 -57.6 -56.0 -57.8 70 -99 SPO 1997 04 28 03 37 39 8.7 -9 673.40 -57.6 -56.0 -57.7 70 -99 SPO 1997 04 28 03 38 40 8.5 -9 673.40 -57.6 -56.0 -57.7 71 -99 SPO 1997 04 28 03 39 40 8.5 -9 673.40 -57.6 -55.9 -57.7 71 -99 SPO 1997 04 28 03 40 39 8.4 -9 673.50 -57.6 -55.9 -57.7 71 -99 SPO 1997 04 28 03 41 38 8.5 -9 673.50 -57.5 -55.8 -57.6 70 -99 SPO 1997 04 28 03 42 39 8.7 -9 673.40 -57.5 -55.8 -57.6 70 -99 SPO 1997 04 28 03 43 39 8.7 -9 673.40 -57.5 -55.8 -57.6 70 -99 SPO 1997 04 28 03 44 39 8.5 -9 673.40 -57.5 -55.8 -57.6 71 -99 SPO 1997 04 28 03 45 40 8.4 -9 673.50 -57.5 -55.6 -57.6 71 -99 SPO 1997 04 28 03 46 40 8.3 -9 673.40 -57.5 -55.6 -57.6 70 -99 SPO 1997 04 28 03 47 40 8.2 -9 673.40 -57.4 -55.6 -57.6 68 -99 SPO 1997 04 28 03 48 40 8.1 -9 673.50 -57.4 -55.7 -57.5 69 -99 SPO 1997 04 28 03 49 41 8.2 -9 673.50 -57.4 -55.7 -57.5 70 -99 SPO 1997 04 28 03 50 41 8.4 -9 673.40 -57.4 -55.7 -57.5 70 -99 SPO 1997 04 28 03 51 41 8.5 -9 673.50 -57.3 -55.6 -57.4 70 -99 SPO 1997 04 28 03 52 42 7.6 -9 673.50 -57.2 -55.6 -57.3 69 -99 SPO 1997 04 28 03 53 42 7.5 -9 673.50 -57.2 -55.7 -57.3 69 -99 SPO 1997 04 28 03 54 42 7.4 -9 673.50 -57.2 -55.8 -57.3 70 -99 SPO 1997 04 28 03 55 43 7.2 -9 673.50 -57.3 -55.8 -57.4 71 -99 SPO 1997 04 28 03 56 43 7.1 -9 673.50 -57.3 -55.9 -57.4 71 -99 SPO 1997 04 28 03 57 44 6.9 -9 673.50 -57.3 -56.0 -57.4 71 -99 SPO 1997 04 28 03 58 45 6.5 -9 673.50 -57.3 -56.0 -57.4 71 -99 SPO 1997 04 28 03 59 48 6.3 -9 673.50 -57.3 -56.1 -57.4 71 -99 SPO 1997 04 28 04 00 50 6.2 -9 673.50 -57.4 -56.1 -57.4 72 0 SPO 1997 04 28 04 01 51 6.5 -9 673.50 -57.4 -56.1 -57.5 72 -99 SPO 1997 04 28 04 02 50 6.4 -9 673.50 -57.4 -56.1 -57.5 72 -99 SPO 1997 04 28 04 03 50 6.6 -9 673.40 -57.4 -56.1 -57.5 72 -99 SPO 1997 04 28 04 04 48 6.6 -9 673.40 -57.4 -56.2 -57.5 72 -99 SPO 1997 04 28 04 05 46 6.5 -9 673.40 -57.4 -56.1 -57.4 71 -99 SPO 1997 04 28 04 06 45 6.6 -9 673.40 -57.4 -56.1 -57.5 71 -99 SPO 1997 04 28 04 07 44 6.5 -9 673.40 -57.4 -56.1 -57.5 70 -99 SPO 1997 04 28 04 08 43 6.4 -9 673.40 -57.5 -56.2 -57.6 71 -99 SPO 1997 04 28 04 09 42 6.1 -9 673.30 -57.6 -56.2 -57.6 72 -99 SPO 1997 04 28 04 10 43 6.6 -9 673.30 -57.5 -56.2 -57.6 71 -99 SPO 1997 04 28 04 11 44 6.8 -9 673.30 -57.5 -56.1 -57.6 71 -99 SPO 1997 04 28 04 12 45 6.5 -9 673.30 -57.5 -56.2 -57.6 71 -99 SPO 1997 04 28 04 13 48 6.5 -9 673.40 -57.6 -56.2 -57.6 72 -99 SPO 1997 04 28 04 14 49 6.2 -9 673.30 -57.6 -56.2 -57.6 73 -99 SPO 1997 04 28 04 15 48 6.4 -9 673.30 -57.7 -56.2 -57.7 73 -99 SPO 1997 04 28 04 16 48 6.8 -9 673.30 -57.6 -56.1 -57.7 72 -99 SPO 1997 04 28 04 17 48 7.0 -9 673.30 -57.5 -56.0 -57.6 71 -99 SPO 1997 04 28 04 18 46 7.3 -9 673.30 -57.5 -56.0 -57.6 70 -99 SPO 1997 04 28 04 19 46 7.4 -9 673.30 -57.5 -55.9 -57.6 70 -99 SPO 1997 04 28 04 20 45 7.3 -9 673.30 -57.5 -55.8 -57.5 71 -99 SPO 1997 04 28 04 21 44 7.3 -9 673.30 -57.4 -55.8 -57.5 70 -99 SPO 1997 04 28 04 22 45 7.2 -9 673.20 -57.4 -55.8 -57.6 70 -99 SPO 1997 04 28 04 23 45 7.2 -9 673.20 -57.4 -55.8 -57.5 71 -99 SPO 1997 04 28 04 24 46 7.1 -9 673.20 -57.4 -55.8 -57.5 71 -99 SPO 1997 04 28 04 25 47 7.2 -9 673.30 -57.4 -55.8 -57.5 71 -99 SPO 1997 04 28 04 26 47 6.9 -9 673.30 -57.4 -55.8 -57.5 72 -99 SPO 1997 04 28 04 27 47 7.2 -9 673.30 -57.4 -55.9 -57.5 71 -99 SPO 1997 04 28 04 28 48 7.1 -9 673.30 -57.3 -55.9 -57.4 70 -99 SPO 1997 04 28 04 29 48 7.4 -9 673.30 -57.3 -55.8 -57.4 70 -99 SPO 1997 04 28 04 30 48 7.4 -9 673.20 -57.2 -55.7 -57.4 69 -99 SPO 1997 04 28 04 31 47 7.5 -9 673.20 -57.2 -55.7 -57.4 69 -99 SPO 1997 04 28 04 32 47 7.5 -9 673.20 -57.2 -55.6 -57.3 70 -99 SPO 1997 04 28 04 33 46 7.6 -9 673.20 -57.2 -55.6 -57.4 70 -99 SPO 1997 04 28 04 34 45 7.7 -9 673.20 -57.2 -55.6 -57.3 70 -99 SPO 1997 04 28 04 35 45 8.1 -9 673.20 -57.2 -55.6 -57.3 71 -99 SPO 1997 04 28 04 36 46 8.1 -9 673.20 -57.2 -55.6 -57.3 72 -99 SPO 1997 04 28 04 37 46 7.8 -9 673.20 -57.1 -55.7 -57.3 71 -99 SPO 1997 04 28 04 38 47 7.7 -9 673.30 -57.1 -55.7 -57.2 71 -99 SPO 1997 04 28 04 39 46 7.6 -9 673.20 -57.0 -55.8 -57.3 70 -99 SPO 1997 04 28 04 40 45 7.9 -9 673.20 -57.1 -55.8 -57.3 71 -99 SPO 1997 04 28 04 41 44 8.2 -9 673.20 -57.1 -55.7 -57.2 70 -99 SPO 1997 04 28 04 42 43 8.3 -9 673.20 -57.1 -55.6 -57.2 70 -99 SPO 1997 04 28 04 43 42 8.4 -9 673.20 -57.0 -55.4 -57.1 69 -99 SPO 1997 04 28 04 44 41 8.7 -9 673.20 -57.0 -55.4 -57.1 69 -99 SPO 1997 04 28 04 45 42 8.6 -9 673.20 -57.0 -55.4 -57.1 70 -99 SPO 1997 04 28 04 46 42 8.6 -9 673.20 -56.9 -55.4 -57.0 69 -99 SPO 1997 04 28 04 47 42 8.6 -9 673.20 -56.9 -55.4 -57.1 69 -99 SPO 1997 04 28 04 48 41 8.7 -9 673.20 -56.9 -55.3 -57.0 70 -99 SPO 1997 04 28 04 49 42 8.6 -9 673.20 -56.9 -55.3 -57.0 70 -99 SPO 1997 04 28 04 50 42 8.6 -9 673.10 -56.9 -55.2 -57.0 69 -99 SPO 1997 04 28 04 51 41 8.4 -9 673.10 -56.9 -55.2 -57.0 69 -99 SPO 1997 04 28 04 52 41 8.6 -9 673.10 -56.9 -55.3 -57.0 69 -99 SPO 1997 04 28 04 53 41 8.8 -9 673.10 -56.9 -55.3 -57.0 70 -99 SPO 1997 04 28 04 54 41 9.0 -9 673.10 -56.8 -55.2 -57.0 69 -99 SPO 1997 04 28 04 55 41 8.8 -9 673.10 -56.8 -55.2 -57.0 69 -99 SPO 1997 04 28 04 56 41 8.8 -9 673.10 -56.8 -55.2 -57.0 70 -99 SPO 1997 04 28 04 57 41 8.7 -9 673.10 -56.8 -55.2 -56.9 70 -99 SPO 1997 04 28 04 58 43 8.4 -9 673.10 -56.8 -55.2 -56.9 71 -99 SPO 1997 04 28 04 59 42 8.2 -9 673.10 -56.8 -55.3 -56.9 71 -99 SPO 1997 04 28 05 00 41 8.2 -9 673.10 -56.8 -55.3 -57.0 71 0 SPO 1997 04 28 05 01 41 8.2 -9 673.10 -56.9 -55.4 -56.9 71 -99 SPO 1997 04 28 05 02 40 8.2 -9 673.10 -56.9 -55.3 -56.9 71 -99 SPO 1997 04 28 05 03 40 8.1 -9 673.10 -56.9 -55.3 -56.9 70 -99 SPO 1997 04 28 05 04 41 8.4 -9 673.10 -56.9 -55.2 -57.0 70 -99 SPO 1997 04 28 05 05 41 8.4 -9 673.10 -56.9 -55.2 -56.9 69 -99 SPO 1997 04 28 05 06 41 8.1 -9 673.10 -56.9 -55.2 -56.9 69 -99 SPO 1997 04 28 05 07 41 7.8 -9 673.20 -56.8 -55.2 -56.9 69 -99 SPO 1997 04 28 05 08 40 7.6 -9 673.20 -56.9 -55.3 -56.9 70 -99 SPO 1997 04 28 05 09 41 7.7 -9 673.20 -56.9 -55.4 -57.0 70 -99 SPO 1997 04 28 05 10 41 7.6 -9 673.20 -56.8 -55.3 -57.0 69 -99 SPO 1997 04 28 05 11 40 7.4 -9 673.20 -56.9 -55.3 -56.9 70 -99 SPO 1997 04 28 05 12 41 7.3 -9 673.20 -56.9 -55.4 -57.0 70 -99 SPO 1997 04 28 05 13 42 7.6 -9 673.20 -56.9 -55.4 -57.0 70 -99 SPO 1997 04 28 05 14 41 7.7 -9 673.20 -56.9 -55.2 -57.0 69 -99 SPO 1997 04 28 05 15 42 7.8 -9 673.20 -56.9 -55.1 -57.0 69 -99 SPO 1997 04 28 05 16 42 7.9 -9 673.20 -56.9 -55.0 -56.9 69 -99 SPO 1997 04 28 05 17 42 7.5 -9 673.20 -56.8 -55.0 -56.9 68 -99 SPO 1997 04 28 05 18 41 7.4 -9 673.20 -56.8 -55.0 -56.9 69 -99 SPO 1997 04 28 05 19 41 7.4 -9 673.20 -56.8 -55.0 -56.9 69 -99 SPO 1997 04 28 05 20 41 7.3 -9 673.20 -56.8 -55.1 -56.9 70 -99 SPO 1997 04 28 05 21 42 7.0 -9 673.20 -56.8 -55.1 -56.9 70 -99 SPO 1997 04 28 05 22 43 7.0 -9 673.20 -56.8 -55.1 -56.9 70 -99 SPO 1997 04 28 05 23 44 7.1 -9 673.20 -56.8 -55.1 -56.9 70 -99 SPO 1997 04 28 05 24 44 7.0 -9 673.20 -56.8 -55.2 -56.9 69 -99 SPO 1997 04 28 05 25 45 7.2 -9 673.20 -56.9 -55.3 -56.9 69 -99 SPO 1997 04 28 05 26 47 6.8 -9 673.20 -56.9 -55.4 -57.0 69 -99 SPO 1997 04 28 05 27 50 6.2 -9 673.20 -57.0 -55.6 -57.1 70 -99 SPO 1997 04 28 05 28 51 6.2 -9 673.20 -57.2 -55.8 -57.2 71 -99 SPO 1997 04 28 05 29 52 5.8 -9 673.20 -57.4 -55.7 -57.3 73 -99 SPO 1997 04 28 05 30 53 5.8 -9 673.20 -57.6 -55.8 -57.5 74 -99 SPO 1997 04 28 05 31 57 5.4 -9 673.20 -57.6 -56.0 -57.6 74 -99 SPO 1997 04 28 05 32 62 4.9 -9 673.20 -58.0 -56.3 -57.7 76 -99 SPO 1997 04 28 05 33 64 4.6 -9 673.20 -58.5 -56.6 -58.0 79 -99 SPO 1997 04 28 05 34 62 5.0 -9 673.20 -59.0 -56.8 -58.3 81 -99 SPO 1997 04 28 05 35 62 5.3 -9 673.20 -59.4 -56.7 -58.6 81 -99 SPO 1997 04 28 05 36 63 5.4 -9 673.20 -59.7 -56.8 -58.8 81 -99 SPO 1997 04 28 05 37 60 5.7 -9 673.20 -59.8 -56.8 -59.0 78 -99 SPO 1997 04 28 05 38 58 5.7 -9 673.20 -59.8 -56.8 -59.1 75 -99 SPO 1997 04 28 05 39 59 5.4 -9 673.20 -59.6 -56.9 -59.0 71 -99 SPO 1997 04 28 05 40 59 5.2 -9 673.20 -59.5 -57.0 -59.0 70 -99 SPO 1997 04 28 05 41 59 5.5 -9 673.20 -59.5 -57.1 -59.1 70 -99 SPO 1997 04 28 05 42 58 5.8 -9 673.20 -59.4 -57.1 -59.1 69 -99 SPO 1997 04 28 05 43 58 5.8 -9 673.20 -59.4 -57.1 -59.1 69 -99 SPO 1997 04 28 05 44 59 5.5 -9 673.20 -59.4 -57.0 -59.1 69 -99 SPO 1997 04 28 05 45 59 5.5 -9 673.20 -59.4 -57.0 -59.1 69 -99 SPO 1997 04 28 05 46 60 4.8 -9 673.20 -59.4 -57.0 -59.2 69 -99 SPO 1997 04 28 05 47 60 4.8 -9 673.20 -59.4 -57.1 -59.2 68 -99 SPO 1997 04 28 05 48 62 4.5 -9 673.20 -59.4 -57.3 -59.3 67 -99 SPO 1997 04 28 05 49 62 4.2 -9 673.20 -59.6 -57.4 -59.4 69 -99 SPO 1997 04 28 05 50 62 4.4 -9 673.20 -59.8 -57.4 -59.5 69 -99 SPO 1997 04 28 05 51 61 4.5 -9 673.20 -60.0 -57.3 -59.6 69 -99 SPO 1997 04 28 05 52 62 4.3 -9 673.20 -60.1 -57.3 -59.6 69 -99 SPO 1997 04 28 05 53 62 4.0 -9 673.20 -60.4 -57.3 -59.8 70 -99 SPO 1997 04 28 05 54 63 3.5 -9 673.20 -60.5 -57.4 -59.8 70 -99 SPO 1997 04 28 05 55 62 3.1 -9 673.20 -60.6 -57.6 -60.0 70 -99 SPO 1997 04 28 05 56 61 3.0 -9 673.30 -60.7 -57.8 -60.1 69 -99 SPO 1997 04 28 05 57 64 3.2 -9 673.30 -60.8 -58.0 -60.2 70 -99 SPO 1997 04 28 05 58 63 3.2 -9 673.30 -60.9 -58.2 -60.2 69 -99 SPO 1997 04 28 05 59 61 3.0 -9 673.30 -60.9 -58.2 -60.3 68 -99 SPO 1997 04 28 06 00 58 3.0 -9 673.30 -61.0 -58.3 -60.3 68 0 SPO 1997 04 28 06 01 57 3.1 -9 673.30 -61.0 -58.1 -60.4 68 -99 SPO 1997 04 28 06 02 56 3.1 -9 673.30 -61.1 -57.9 -60.5 68 -99 SPO 1997 04 28 06 03 57 3.2 -9 673.30 -61.2 -57.8 -60.6 68 -99 SPO 1997 04 28 06 04 59 3.0 -9 673.30 -61.2 -57.8 -60.6 68 -99 SPO 1997 04 28 06 05 61 2.9 -9 673.30 -61.2 -57.8 -60.7 68 -99 SPO 1997 04 28 06 06 64 2.5 -9 673.30 -61.3 -57.8 -60.7 69 -99 SPO 1997 04 28 06 07 69 2.2 -9 673.30 -61.4 -58.0 -60.8 70 -99 SPO 1997 04 28 06 08 75 2.4 -9 673.30 -61.5 -58.2 -60.9 70 -99 SPO 1997 04 28 06 09 68 2.4 -9 673.20 -61.6 -58.1 -61.0 70 -99 SPO 1997 04 28 06 10 63 2.5 -9 673.20 -61.6 -57.9 -61.1 68 -99 SPO 1997 04 28 06 11 55 2.8 -9 673.20 -61.6 -57.6 -61.1 67 -99 SPO 1997 04 28 06 12 44 4.1 -9 673.20 -61.7 -57.0 -61.2 67 -99 SPO 1997 04 28 06 13 45 5.2 -9 673.20 -61.6 -56.4 -61.2 66 -99 SPO 1997 04 28 06 14 45 5.6 -9 673.20 -60.8 -55.9 -60.8 59 -99 SPO 1997 04 28 06 15 43 6.5 -9 673.20 -59.6 -55.6 -60.0 54 -99 SPO 1997 04 28 06 16 43 6.5 -9 673.20 -58.6 -55.4 -59.2 51 -99 SPO 1997 04 28 06 17 46 6.2 -9 673.20 -58.2 -55.3 -58.8 52 -99 SPO 1997 04 28 06 18 50 5.9 -9 673.20 -58.2 -55.2 -58.8 55 -99 SPO 1997 04 28 06 19 56 5.5 -9 673.20 -58.4 -55.4 -59.0 59 -99 SPO 1997 04 28 06 20 56 5.0 -9 673.20 -58.6 -55.6 -59.2 62 -99 SPO 1997 04 28 06 21 56 5.0 -9 673.20 -59.0 -56.0 -59.4 65 -99 SPO 1997 04 28 06 22 56 4.9 -9 673.20 -59.1 -56.2 -59.5 65 -99 SPO 1997 04 28 06 23 59 4.7 -9 673.20 -59.2 -56.1 -59.6 65 -99 SPO 1997 04 28 06 24 61 4.9 -9 673.20 -59.4 -56.0 -59.6 66 -99 SPO 1997 04 28 06 25 64 4.8 -9 673.20 -59.5 -56.0 -59.7 67 -99 SPO 1997 04 28 06 26 69 4.5 -9 673.20 -59.6 -56.3 -59.8 68 -99 SPO 1997 04 28 06 27 71 4.7 -9 673.20 -59.8 -56.5 -59.8 69 -99 SPO 1997 04 28 06 28 70 4.8 -9 673.20 -60.0 -56.6 -59.9 70 -99 SPO 1997 04 28 06 29 69 4.9 -9 673.20 -60.1 -56.7 -60.0 70 -99 SPO 1997 04 28 06 30 67 4.9 -9 673.20 -60.2 -56.5 -60.1 70 -99 SPO 1997 04 28 06 31 68 4.8 -9 673.20 -60.2 -56.5 -60.1 70 -99 SPO 1997 04 28 06 32 69 4.9 -9 673.10 -60.2 -56.4 -60.1 69 -99 SPO 1997 04 28 06 33 69 5.0 -9 673.10 -60.3 -56.4 -60.2 69 -99 SPO 1997 04 28 06 34 71 5.0 -9 673.10 -60.4 -56.4 -60.2 69 -99 SPO 1997 04 28 06 35 71 5.2 -9 673.10 -60.5 -56.4 -60.3 69 -99 SPO 1997 04 28 06 36 70 5.3 -9 673.10 -60.5 -56.5 -60.3 69 -99 SPO 1997 04 28 06 37 69 5.3 -9 673.10 -60.5 -56.5 -60.3 68 -99 SPO 1997 04 28 06 38 68 5.4 -9 673.10 -60.6 -56.5 -60.4 69 -99 SPO 1997 04 28 06 39 67 5.5 -9 673.10 -60.6 -56.2 -60.4 68 -99 SPO 1997 04 28 06 40 65 5.6 -9 673.10 -60.5 -56.1 -60.4 68 -99 SPO 1997 04 28 06 41 65 5.6 -9 673.10 -60.4 -56.0 -60.4 68 -99 SPO 1997 04 28 06 42 63 5.6 -9 673.00 -60.4 -56.1 -60.4 68 -99 SPO 1997 04 28 06 43 65 5.6 -9 673.00 -60.4 -55.9 -60.4 68 -99 SPO 1997 04 28 06 44 63 5.5 -9 673.00 -60.5 -55.6 -60.4 68 -99 SPO 1997 04 28 06 45 65 5.4 -9 673.00 -60.6 -55.6 -60.5 68 -99 SPO 1997 04 28 06 46 64 5.8 -9 673.00 -60.6 -55.6 -60.5 68 -99 SPO 1997 04 28 06 47 62 5.8 -9 673.00 -60.6 -55.5 -60.5 68 -99 SPO 1997 04 28 06 48 61 5.9 -9 673.00 -60.6 -55.4 -60.6 68 -99 SPO 1997 04 28 06 49 60 6.1 -9 672.90 -60.5 -55.2 -60.5 67 -99 SPO 1997 04 28 06 50 61 6.1 -9 673.00 -60.5 -55.0 -60.5 67 -99 SPO 1997 04 28 06 51 61 6.5 -9 672.90 -60.5 -55.0 -60.5 67 -99 SPO 1997 04 28 06 52 62 6.2 -9 673.00 -60.4 -55.0 -60.5 67 -99 SPO 1997 04 28 06 53 63 6.6 -9 672.90 -60.4 -55.0 -60.4 67 -99 SPO 1997 04 28 06 54 64 6.5 -9 672.90 -60.3 -54.9 -60.4 67 -99 SPO 1997 04 28 06 55 65 6.5 -9 672.90 -60.2 -55.1 -60.4 66 -99 SPO 1997 04 28 06 56 65 6.4 -9 672.90 -60.3 -55.2 -60.4 67 -99 SPO 1997 04 28 06 57 65 6.5 -9 672.90 -60.3 -55.2 -60.4 67 -99 SPO 1997 04 28 06 58 65 6.5 -9 672.90 -60.3 -55.2 -60.4 67 -99 SPO 1997 04 28 06 59 65 6.6 -9 672.90 -60.2 -55.1 -60.4 65 -99 SPO 1997 04 28 07 00 65 6.7 -9 672.90 -60.2 -55.2 -60.3 65 0 SPO 1997 04 28 07 01 65 6.8 -9 672.90 -60.2 -55.2 -60.4 66 -99 SPO 1997 04 28 07 02 66 6.8 -9 672.90 -60.3 -55.4 -60.4 67 -99 SPO 1997 04 28 07 03 68 6.8 -9 672.90 -60.2 -55.6 -60.4 66 -99 SPO 1997 04 28 07 04 69 6.7 -9 672.90 -60.2 -55.8 -60.4 67 -99 SPO 1997 04 28 07 05 69 6.5 -9 672.90 -60.2 -55.9 -60.4 68 -99 SPO 1997 04 28 07 06 68 6.3 -9 672.90 -60.3 -55.9 -60.4 68 -99 SPO 1997 04 28 07 07 68 6.1 -9 672.90 -60.4 -55.8 -60.4 69 -99 SPO 1997 04 28 07 08 69 6.5 -9 672.80 -60.4 -55.6 -60.5 69 -99 SPO 1997 04 28 07 09 68 6.7 -9 672.80 -60.5 -55.4 -60.6 68 -99 SPO 1997 04 28 07 10 67 6.7 -9 672.80 -60.6 -55.2 -60.6 68 -99 SPO 1997 04 28 07 11 65 7.2 -9 672.80 -60.6 -55.2 -60.6 68 -99 SPO 1997 04 28 07 12 64 7.2 -9 672.80 -60.5 -55.2 -60.6 68 -99 SPO 1997 04 28 07 13 61 7.3 -9 672.70 -60.4 -55.2 -60.5 68 -99 SPO 1997 04 28 07 14 62 7.2 -9 672.70 -60.4 -55.1 -60.4 67 -99 SPO 1997 04 28 07 15 63 7.3 -9 672.70 -60.3 -55.3 -60.4 66 -99 SPO 1997 04 28 07 16 64 7.2 -9 672.70 -60.3 -55.4 -60.4 67 -99 SPO 1997 04 28 07 17 63 7.0 -9 672.70 -60.2 -55.6 -60.4 66 -99 SPO 1997 04 28 07 18 62 6.8 -9 672.70 -60.2 -55.6 -60.4 66 -99 SPO 1997 04 28 07 19 61 6.5 -9 672.70 -60.2 -55.4 -60.4 66 -99 SPO 1997 04 28 07 20 61 6.5 -9 672.70 -60.3 -55.4 -60.4 66 -99 SPO 1997 04 28 07 21 60 6.7 -9 672.70 -60.4 -55.6 -60.5 67 -99 SPO 1997 04 28 07 22 61 6.8 -9 672.70 -60.5 -55.6 -60.5 67 -99 SPO 1997 04 28 07 23 61 6.6 -9 672.70 -60.6 -55.7 -60.6 68 -99 SPO 1997 04 28 07 24 60 6.8 -9 672.70 -60.7 -55.8 -60.7 68 -99 SPO 1997 04 28 07 25 59 7.0 -9 672.60 -60.8 -55.6 -60.8 69 -99 SPO 1997 04 28 07 26 58 7.0 -9 672.60 -60.9 -55.4 -60.8 69 -99 SPO 1997 04 28 07 27 57 7.0 -9 672.60 -60.9 -55.1 -60.9 69 -99 SPO 1997 04 28 07 28 56 6.9 -9 672.60 -61.0 -54.8 -60.9 69 -99 SPO 1997 04 28 07 29 57 6.7 -9 672.60 -61.0 -54.9 -60.9 68 -99 SPO 1997 04 28 07 30 57 6.1 -9 672.60 -61.0 -54.9 -60.9 68 -99 SPO 1997 04 28 07 31 60 5.6 -9 672.60 -61.0 -55.2 -60.9 67 -99 SPO 1997 04 28 07 32 61 5.4 -9 672.60 -61.1 -55.7 -61.0 67 -99 SPO 1997 04 28 07 33 63 6.2 -9 672.60 -61.2 -56.1 -61.1 67 -99 SPO 1997 04 28 07 34 61 6.0 -9 672.60 -61.2 -56.0 -61.1 67 -99 SPO 1997 04 28 07 35 62 5.9 -9 672.60 -61.2 -56.2 -61.1 67 -99 SPO 1997 04 28 07 36 61 5.8 -9 672.60 -61.2 -56.6 -61.1 67 -99 SPO 1997 04 28 07 37 62 5.7 -9 672.60 -61.1 -56.6 -61.1 66 -99 SPO 1997 04 28 07 38 62 5.5 -9 672.60 -61.1 -56.8 -61.1 66 -99 SPO 1997 04 28 07 39 62 5.5 -9 672.60 -61.1 -57.2 -61.1 67 -99 SPO 1997 04 28 07 40 59 5.6 -9 672.60 -61.0 -57.5 -61.1 66 -99 SPO 1997 04 28 07 41 57 5.4 -9 672.60 -61.0 -57.3 -61.1 65 -99 SPO 1997 04 28 07 42 54 5.0 -9 672.60 -61.0 -57.3 -61.1 65 -99 SPO 1997 04 28 07 43 52 4.8 -9 672.60 -61.1 -57.1 -61.1 65 -99 SPO 1997 04 28 07 44 52 5.1 -9 672.60 -61.0 -56.4 -61.1 64 -99 SPO 1997 04 28 07 45 52 5.1 -9 672.60 -60.9 -55.9 -61.0 63 -99 SPO 1997 04 28 07 46 53 5.4 -9 672.60 -60.8 -55.9 -60.9 63 -99 SPO 1997 04 28 07 47 56 5.8 -9 672.60 -60.4 -55.9 -60.8 61 -99 SPO 1997 04 28 07 48 55 6.2 -9 672.60 -59.7 -55.9 -60.2 57 -99 SPO 1997 04 28 07 49 54 6.3 -9 672.60 -59.3 -55.7 -59.9 57 -99 SPO 1997 04 28 07 50 53 6.6 -9 672.60 -59.0 -55.4 -59.7 57 -99 SPO 1997 04 28 07 51 54 6.4 -9 672.60 -58.8 -55.4 -59.4 58 -99 SPO 1997 04 28 07 52 54 6.0 -9 672.60 -58.6 -55.4 -59.3 58 -99 SPO 1997 04 28 07 53 55 5.8 -9 672.50 -58.6 -55.6 -59.3 59 -99 SPO 1997 04 28 07 54 54 6.0 -9 672.50 -58.6 -55.6 -59.3 61 -99 SPO 1997 04 28 07 55 54 6.3 -9 672.50 -58.6 -55.5 -59.2 62 -99 SPO 1997 04 28 07 56 52 6.9 -9 672.50 -58.4 -55.3 -59.0 61 -99 SPO 1997 04 28 07 57 51 7.2 -9 672.50 -58.2 -55.0 -58.8 61 -99 SPO 1997 04 28 07 58 51 7.3 -9 672.50 -58.0 -54.8 -58.7 61 -99 SPO 1997 04 28 07 59 50 7.1 -9 672.50 -58.0 -54.7 -58.6 62 -99 SPO 1997 04 28 08 00 51 6.9 -9 672.50 -57.9 -54.7 -58.5 64 0 SPO 1997 04 28 08 01 52 6.8 -9 672.50 -57.9 -54.8 -58.4 65 -99 SPO 1997 04 28 08 02 53 6.5 -9 672.50 -57.9 -54.8 -58.4 66 -99 SPO 1997 04 28 08 03 51 6.4 -9 672.50 -57.9 -55.0 -58.4 66 -99 SPO 1997 04 28 08 04 53 6.3 -9 672.50 -58.0 -55.1 -58.4 66 -99 SPO 1997 04 28 08 05 53 6.3 -9 672.40 -58.1 -55.2 -58.4 68 -99 SPO 1997 04 28 08 06 51 6.6 -9 672.50 -58.2 -55.0 -58.5 70 -99 SPO 1997 04 28 08 07 49 6.6 -9 672.50 -58.2 -54.9 -58.5 70 -99 SPO 1997 04 28 08 08 49 6.7 -9 672.50 -58.2 -54.7 -58.4 70 -99 SPO 1997 04 28 08 09 48 6.9 -9 672.40 -58.0 -54.5 -58.3 68 -99 SPO 1997 04 28 08 10 48 7.1 -9 672.40 -57.8 -54.3 -58.1 67 -99 SPO 1997 04 28 08 11 46 6.9 -9 672.40 -57.6 -54.1 -58.0 67 -99 SPO 1997 04 28 08 12 44 7.1 -9 672.40 -57.4 -54.1 -57.8 66 -99 SPO 1997 04 28 08 13 46 6.9 -9 672.40 -57.2 -54.2 -57.6 65 -99 SPO 1997 04 28 08 14 46 6.6 -9 672.40 -57.2 -54.2 -57.6 65 -99 SPO 1997 04 28 08 15 45 6.5 -9 672.40 -57.2 -54.2 -57.6 66 -99 SPO 1997 04 28 08 16 44 6.2 -9 672.40 -57.2 -54.2 -57.6 66 -99 SPO 1997 04 28 08 17 44 6.2 -9 672.40 -57.2 -54.2 -57.6 67 -99 SPO 1997 04 28 08 18 43 6.4 -9 672.40 -57.2 -54.0 -57.6 67 -99 SPO 1997 04 28 08 19 42 6.9 -9 672.40 -56.9 -53.9 -57.3 64 -99 SPO 1997 04 28 08 20 44 7.5 -9 672.40 -56.4 -53.8 -56.8 62 -99 SPO 1997 04 28 08 21 43 7.3 -9 672.40 -56.1 -53.8 -56.6 62 -99 SPO 1997 04 28 08 22 39 7.2 -9 672.40 -56.0 -53.8 -56.4 64 -99 SPO 1997 04 28 08 23 38 7.9 -9 672.40 -55.7 -53.8 -56.2 63 -99 SPO 1997 04 28 08 24 39 8.2 -9 672.30 -55.5 -53.6 -56.0 63 -99 SPO 1997 04 28 08 25 39 7.3 -9 672.30 -55.3 -53.5 -55.8 63 -99 SPO 1997 04 28 08 26 40 7.4 -9 672.30 -55.3 -53.7 -55.8 65 -99 SPO 1997 04 28 08 27 39 7.7 -9 672.30 -55.4 -53.7 -55.8 66 -99 SPO 1997 04 28 08 28 38 8.0 -9 672.20 -55.4 -53.7 -55.8 66 -99 SPO 1997 04 28 08 29 39 8.0 -9 672.20 -55.2 -53.6 -55.6 66 -99 SPO 1997 04 28 08 30 40 7.9 -9 672.20 -55.2 -53.6 -55.6 66 -99 SPO 1997 04 28 08 31 41 8.0 -9 672.20 -55.2 -53.6 -55.6 67 -99 SPO 1997 04 28 08 32 41 7.6 -9 672.20 -55.3 -53.7 -55.7 68 -99 SPO 1997 04 28 08 33 43 7.7 -9 672.20 -55.4 -53.6 -55.8 70 -99 SPO 1997 04 28 08 34 43 7.1 -9 672.20 -55.5 -53.7 -55.8 70 -99 SPO 1997 04 28 08 35 45 6.8 -9 672.30 -55.6 -53.9 -55.8 70 -99 SPO 1997 04 28 08 36 46 6.9 -9 672.30 -55.8 -54.1 -56.0 71 -99 SPO 1997 04 28 08 37 49 6.6 -9 672.30 -56.0 -54.2 -56.1 73 -99 SPO 1997 04 28 08 38 47 6.6 -9 672.30 -56.2 -54.3 -56.2 75 -99 SPO 1997 04 28 08 39 45 6.6 -9 672.30 -56.2 -54.4 -56.2 74 -99 SPO 1997 04 28 08 40 44 6.4 -9 672.20 -56.3 -54.4 -56.3 73 -99 SPO 1997 04 28 08 41 42 6.8 -9 672.20 -56.3 -54.4 -56.3 73 -99 SPO 1997 04 28 08 42 43 7.0 -9 672.20 -56.3 -54.3 -56.3 73 -99 SPO 1997 04 28 08 43 43 7.0 -9 672.20 -56.4 -54.2 -56.3 73 -99 SPO 1997 04 28 08 44 44 7.1 -9 672.20 -56.4 -54.1 -56.3 73 -99 SPO 1997 04 28 08 45 43 7.4 -9 672.20 -56.3 -54.1 -56.3 73 -99 SPO 1997 04 28 08 46 43 7.5 -9 672.20 -56.3 -54.0 -56.4 73 -99 SPO 1997 04 28 08 47 44 7.5 -9 672.20 -56.3 -54.0 -56.3 73 -99 SPO 1997 04 28 08 48 45 7.5 -9 672.20 -56.3 -54.0 -56.3 73 -99 SPO 1997 04 28 08 49 45 7.4 -9 672.20 -56.3 -53.9 -56.3 72 -99 SPO 1997 04 28 08 50 46 7.6 -9 672.20 -56.3 -53.8 -56.3 72 -99 SPO 1997 04 28 08 51 47 7.5 -9 672.20 -56.3 -53.8 -56.3 71 -99 SPO 1997 04 28 08 52 50 7.5 -9 672.20 -56.3 -53.9 -56.4 71 -99 SPO 1997 04 28 08 53 52 7.3 -9 672.20 -56.4 -54.1 -56.4 71 -99 SPO 1997 04 28 08 54 52 7.3 -9 672.10 -56.6 -54.1 -56.6 73 -99 SPO 1997 04 28 08 55 53 7.0 -9 672.20 -56.6 -54.2 -56.6 73 -99 SPO 1997 04 28 08 56 55 6.2 -9 672.20 -56.8 -54.6 -56.8 75 -99 SPO 1997 04 28 08 57 55 6.0 -9 672.20 -57.0 -54.9 -56.9 76 -99 SPO 1997 04 28 08 58 55 5.7 -9 672.20 -57.2 -55.2 -57.0 77 -99 SPO 1997 04 28 08 59 57 5.1 -9 672.20 -57.5 -55.5 -57.2 79 -99 SPO 1997 04 28 09 00 56 4.8 -9 672.20 -57.8 -55.6 -57.4 80 0 SPO 1997 04 28 09 01 56 5.5 -9 672.10 -58.1 -55.6 -57.6 80 -99 SPO 1997 04 28 09 02 56 5.7 -9 672.10 -58.2 -55.4 -57.7 79 -99 SPO 1997 04 28 09 03 57 5.9 -9 672.10 -58.2 -55.3 -57.8 77 -99 SPO 1997 04 28 09 04 59 5.5 -9 672.10 -58.2 -55.4 -57.8 76 -99 SPO 1997 04 28 09 05 62 5.3 -9 672.10 -58.2 -55.7 -57.8 75 -99 SPO 1997 04 28 09 06 60 5.3 -9 672.10 -58.4 -56.0 -58.0 76 -99 SPO 1997 04 28 09 07 59 5.2 -9 672.10 -58.6 -56.4 -58.2 77 -99 SPO 1997 04 28 09 08 57 5.3 -9 672.10 -58.7 -56.4 -58.2 76 -99 SPO 1997 04 28 09 09 52 5.8 -9 672.10 -58.8 -56.2 -58.3 75 -99 SPO 1997 04 28 09 10 51 6.0 -9 672.10 -58.7 -55.8 -58.3 73 -99 SPO 1997 04 28 09 11 52 6.1 -9 672.10 -58.6 -55.3 -58.3 72 -99 SPO 1997 04 28 09 12 52 6.2 -9 672.10 -58.5 -55.0 -58.3 71 -99 SPO 1997 04 28 09 13 52 6.4 -9 672.00 -58.4 -55.0 -58.3 70 -99 SPO 1997 04 28 09 14 52 6.4 -9 672.00 -58.3 -55.0 -58.2 70 -99 SPO 1997 04 28 09 15 54 6.2 -9 672.00 -58.3 -54.9 -58.2 70 -99 SPO 1997 04 28 09 16 55 6.0 -9 672.00 -58.4 -55.1 -58.3 71 -99 SPO 1997 04 28 09 17 55 5.9 -9 672.00 -58.5 -55.3 -58.4 72 -99 SPO 1997 04 28 09 18 55 5.8 -9 672.00 -58.6 -55.5 -58.4 72 -99 SPO 1997 04 28 09 19 56 5.6 -9 672.00 -58.6 -55.8 -58.5 72 -99 SPO 1997 04 28 09 20 55 5.7 -9 672.00 -58.7 -56.1 -58.6 73 -99 SPO 1997 04 28 09 21 57 5.6 -9 672.00 -58.8 -56.3 -58.6 73 -99 SPO 1997 04 28 09 22 58 5.7 -9 672.00 -58.8 -56.5 -58.7 72 -99 SPO 1997 04 28 09 23 59 5.6 -9 672.00 -58.8 -56.8 -58.7 72 -99 SPO 1997 04 28 09 24 59 5.7 -9 672.00 -58.9 -56.8 -58.8 71 -99 SPO 1997 04 28 09 25 58 5.7 -9 672.00 -58.9 -56.9 -58.8 70 -99 SPO 1997 04 28 09 26 57 5.7 -9 672.00 -58.9 -56.7 -58.8 69 -99 SPO 1997 04 28 09 27 57 5.8 -9 672.00 -58.9 -56.5 -58.8 68 -99 SPO 1997 04 28 09 28 54 6.3 -9 672.00 -58.9 -56.1 -58.8 69 -99 SPO 1997 04 28 09 29 52 6.5 -9 672.00 -58.8 -55.8 -58.8 68 -99 SPO 1997 04 28 09 30 58 6.2 -9 672.00 -58.8 -55.9 -58.8 68 -99 SPO 1997 04 28 09 31 59 6.5 -9 671.90 -58.8 -55.8 -58.8 68 -99 SPO 1997 04 28 09 32 57 6.2 -9 671.90 -58.9 -55.6 -58.9 69 -99 SPO 1997 04 28 09 33 58 6.0 -9 672.00 -59.0 -55.6 -59.0 70 -99 SPO 1997 04 28 09 34 61 6.2 -9 672.00 -59.0 -55.7 -59.0 69 -99 SPO 1997 04 28 09 35 61 5.9 -9 671.90 -59.0 -55.8 -59.0 69 -99 SPO 1997 04 28 09 36 58 5.3 -9 672.00 -59.1 -55.9 -59.1 69 -99 SPO 1997 04 28 09 37 59 5.4 -9 672.00 -59.2 -56.2 -59.1 69 -99 SPO 1997 04 28 09 38 59 5.5 -9 672.00 -59.3 -56.2 -59.2 69 -99 SPO 1997 04 28 09 39 59 5.9 -9 671.90 -59.4 -56.0 -59.3 70 -99 SPO 1997 04 28 09 40 56 5.8 -9 671.90 -59.6 -55.7 -59.4 70 -99 SPO 1997 04 28 09 41 54 5.9 -9 671.90 -59.6 -55.7 -59.5 69 -99 SPO 1997 04 28 09 42 52 6.1 -9 671.90 -59.7 -55.6 -59.6 70 -99 SPO 1997 04 28 09 43 52 6.1 -9 671.90 -59.7 -55.5 -59.6 70 -99 SPO 1997 04 28 09 44 51 6.2 -9 671.90 -59.7 -55.5 -59.6 69 -99 SPO 1997 04 28 09 45 49 6.3 -9 671.80 -59.6 -55.3 -59.5 67 -99 SPO 1997 04 28 09 46 49 6.2 -9 671.80 -59.4 -55.2 -59.4 65 -99 SPO 1997 04 28 09 47 49 6.3 -9 671.80 -59.4 -55.0 -59.3 65 -99 SPO 1997 04 28 09 48 48 6.3 -9 671.80 -59.2 -54.9 -59.3 64 -99 SPO 1997 04 28 09 49 48 6.8 -9 671.80 -59.0 -54.9 -59.2 63 -99 SPO 1997 04 28 09 50 47 7.1 -9 671.80 -58.8 -54.6 -59.0 62 -99 SPO 1997 04 28 09 51 49 7.0 -9 671.80 -58.5 -54.6 -58.8 62 -99 SPO 1997 04 28 09 52 51 6.3 -9 671.80 -58.4 -54.7 -58.7 62 -99 SPO 1997 04 28 09 53 52 6.0 -9 671.80 -58.4 -54.8 -58.7 64 -99 SPO 1997 04 28 09 54 52 5.8 -9 671.80 -58.5 -55.0 -58.8 66 -99 SPO 1997 04 28 09 55 51 5.7 -9 671.90 -58.4 -55.1 -58.8 66 -99 SPO 1997 04 28 09 56 54 5.8 -9 671.90 -58.3 -55.2 -58.7 65 -99 SPO 1997 04 28 09 57 56 5.4 -9 671.90 -58.2 -55.2 -58.6 64 -99 SPO 1997 04 28 09 58 55 4.9 -9 671.90 -58.1 -55.5 -58.5 63 -99 SPO 1997 04 28 09 59 54 4.5 -9 671.90 -58.1 -55.7 -58.5 64 -99 SPO 1997 04 28 10 00 53 5.0 -9 671.90 -58.1 -55.8 -58.5 64 0 SPO 1997 04 28 10 01 54 5.2 -9 671.90 -58.2 -55.6 -58.5 65 -99 SPO 1997 04 28 10 02 53 5.9 -9 671.90 -57.9 -55.4 -58.4 64 -99 SPO 1997 04 28 10 03 53 5.6 -9 671.90 -57.5 -55.2 -58.0 63 -99 SPO 1997 04 28 10 04 51 5.9 -9 671.90 -57.3 -55.2 -57.9 63 -99 SPO 1997 04 28 10 05 50 6.4 -9 671.90 -57.1 -55.1 -57.7 63 -99 SPO 1997 04 28 10 06 48 6.6 -9 671.80 -56.8 -55.0 -57.5 62 -99 SPO 1997 04 28 10 07 47 6.8 -9 671.80 -56.7 -54.8 -57.3 63 -99 SPO 1997 04 28 10 08 46 7.2 -9 671.80 -56.6 -54.7 -57.2 63 -99 SPO 1997 04 28 10 09 44 7.2 -9 671.80 -56.5 -54.5 -57.1 63 -99 SPO 1997 04 28 10 10 46 7.2 -9 671.80 -56.4 -54.6 -57.0 64 -99 SPO 1997 04 28 10 11 46 7.0 -9 671.80 -56.4 -54.6 -56.9 64 -99 SPO 1997 04 28 10 12 46 7.1 -9 671.80 -56.4 -54.6 -56.9 64 -99 SPO 1997 04 28 10 13 45 7.3 -9 671.80 -56.5 -54.7 -57.0 66 -99 SPO 1997 04 28 10 14 47 7.4 -9 671.80 -56.6 -54.8 -57.0 67 -99 SPO 1997 04 28 10 15 47 7.2 -9 671.70 -56.6 -54.7 -57.0 68 -99 SPO 1997 04 28 10 16 47 7.4 -9 671.70 -56.7 -54.6 -57.1 68 -99 SPO 1997 04 28 10 17 47 7.5 -9 671.70 -56.8 -54.6 -57.1 69 -99 SPO 1997 04 28 10 18 49 7.6 -9 671.70 -56.8 -54.4 -57.1 69 -99 SPO 1997 04 28 10 19 45 7.7 -9 671.70 -56.8 -54.4 -57.1 69 -99 SPO 1997 04 28 10 20 49 7.8 -9 671.70 -56.9 -54.4 -57.1 70 -99 SPO 1997 04 28 10 21 48 7.8 -9 671.70 -56.9 -54.5 -57.1 69 -99 SPO 1997 04 28 10 22 49 7.9 -9 671.60 -57.0 -54.5 -57.1 70 -99 SPO 1997 04 28 10 23 49 7.5 -9 671.60 -57.0 -54.5 -57.2 70 -99 SPO 1997 04 28 10 24 49 7.6 -9 671.60 -57.2 -54.6 -57.2 71 -99 SPO 1997 04 28 10 25 46 7.7 -9 671.60 -57.2 -54.6 -57.3 71 -99 SPO 1997 04 28 10 26 46 8.2 -9 671.60 -57.3 -54.4 -57.3 72 -99 SPO 1997 04 28 10 27 46 8.6 -9 671.60 -57.2 -54.1 -57.3 71 -99 SPO 1997 04 28 10 28 46 8.7 -9 671.50 -57.1 -54.0 -57.2 70 -99 SPO 1997 04 28 10 29 45 8.5 -9 671.50 -57.0 -53.9 -57.1 69 -99 SPO 1997 04 28 10 30 44 8.3 -9 671.50 -57.0 -54.1 -57.1 70 -99 SPO 1997 04 28 10 31 44 8.3 -9 671.50 -57.0 -54.2 -57.1 70 -99 SPO 1997 04 28 10 32 45 8.2 -9 671.50 -56.9 -54.3 -57.1 69 -99 SPO 1997 04 28 10 33 47 8.2 -9 671.50 -57.0 -54.3 -57.1 70 -99 SPO 1997 04 28 10 34 46 8.1 -9 671.50 -57.0 -54.3 -57.1 69 -99 SPO 1997 04 28 10 35 46 8.2 -9 671.50 -57.1 -54.3 -57.2 70 -99 SPO 1997 04 28 10 36 46 8.5 -9 671.50 -57.1 -54.2 -57.1 70 -99 SPO 1997 04 28 10 37 46 8.6 -9 671.50 -57.1 -54.0 -57.2 70 -99 SPO 1997 04 28 10 38 47 8.9 -9 671.50 -57.1 -53.8 -57.2 71 -99 SPO 1997 04 28 10 39 45 8.5 -9 671.50 -57.2 -53.5 -57.2 72 -99 SPO 1997 04 28 10 40 46 8.6 -9 671.50 -57.2 -53.6 -57.3 72 -99 SPO 1997 04 28 10 41 48 8.8 -9 671.50 -57.2 -53.7 -57.3 72 -99 SPO 1997 04 28 10 42 50 8.9 -9 671.50 -57.2 -53.7 -57.3 72 -99 SPO 1997 04 28 10 43 48 8.3 -9 671.40 -57.2 -53.8 -57.3 71 -99 SPO 1997 04 28 10 44 47 8.1 -9 671.50 -57.3 -54.0 -57.3 72 -99 SPO 1997 04 28 10 45 49 8.0 -9 671.50 -57.4 -54.2 -57.4 72 -99 SPO 1997 04 28 10 46 49 7.9 -9 671.50 -57.4 -54.4 -57.4 71 -99 SPO 1997 04 28 10 47 50 7.3 -9 671.50 -57.5 -54.6 -57.5 72 -99 SPO 1997 04 28 10 48 51 7.3 -9 671.50 -57.5 -54.9 -57.6 72 -99 SPO 1997 04 28 10 49 53 7.2 -9 671.60 -57.6 -55.0 -57.6 72 -99 SPO 1997 04 28 10 50 56 7.0 -9 671.60 -57.7 -55.1 -57.7 73 -99 SPO 1997 04 28 10 51 61 6.4 -9 671.60 -57.9 -55.2 -57.8 73 -99 SPO 1997 04 28 10 52 61 6.0 -9 671.60 -58.2 -55.5 -58.0 75 -99 SPO 1997 04 28 10 53 62 6.0 -9 671.60 -58.4 -55.8 -58.2 75 -99 SPO 1997 04 28 10 54 63 5.8 -9 671.50 -58.7 -56.0 -58.4 76 -99 SPO 1997 04 28 10 55 61 5.9 -9 671.50 -58.9 -56.1 -58.5 76 -99 SPO 1997 04 28 10 56 59 6.0 -9 671.50 -59.0 -55.7 -58.6 75 -99 SPO 1997 04 28 10 57 57 5.7 -9 671.50 -59.2 -55.6 -58.8 75 -99 SPO 1997 04 28 10 58 58 5.7 -9 671.50 -59.3 -55.6 -58.8 73 -99 SPO 1997 04 28 10 59 59 6.0 -9 671.50 -59.4 -55.6 -58.9 72 -99 SPO 1997 04 28 11 00 59 6.7 -9 671.50 -59.4 -55.5 -59.0 72 0 SPO 1997 04 28 11 01 59 6.7 -9 671.50 -59.4 -55.3 -59.0 71 -99 SPO 1997 04 28 11 02 58 6.6 -9 671.50 -59.5 -55.2 -59.2 71 -99 SPO 1997 04 28 11 03 58 6.5 -9 671.50 -59.6 -55.1 -59.2 72 -99 SPO 1997 04 28 11 04 57 6.5 -9 671.50 -59.6 -55.0 -59.3 72 -99 SPO 1997 04 28 11 05 56 6.8 -9 671.50 -59.6 -54.8 -59.3 71 -99 SPO 1997 04 28 11 06 56 6.8 -9 671.40 -59.6 -54.6 -59.3 70 -99 SPO 1997 04 28 11 07 55 7.0 -9 671.40 -59.5 -54.6 -59.3 68 -99 SPO 1997 04 28 11 08 55 6.9 -9 671.50 -59.4 -54.6 -59.3 67 -99 SPO 1997 04 28 11 09 55 6.3 -9 671.50 -59.2 -54.7 -59.2 65 -99 SPO 1997 04 28 11 10 55 5.7 -9 671.40 -59.1 -54.8 -59.1 65 -99 SPO 1997 04 28 11 11 56 5.7 -9 671.40 -59.0 -54.9 -59.1 65 -99 SPO 1997 04 28 11 12 55 5.8 -9 671.50 -59.0 -54.8 -59.1 66 -99 SPO 1997 04 28 11 13 57 6.1 -9 671.50 -58.9 -54.7 -59.0 66 -99 SPO 1997 04 28 11 14 59 5.9 -9 671.50 -58.9 -54.9 -59.0 66 -99 SPO 1997 04 28 11 15 59 5.9 -9 671.50 -58.9 -55.0 -59.0 67 -99 SPO 1997 04 28 11 16 61 5.5 -9 671.50 -58.9 -55.2 -59.0 66 -99 SPO 1997 04 28 11 17 62 5.9 -9 671.50 -58.9 -55.2 -59.1 66 -99 SPO 1997 04 28 11 18 59 5.6 -9 671.50 -59.0 -55.2 -59.1 67 -99 SPO 1997 04 28 11 19 59 5.6 -9 671.50 -59.1 -55.2 -59.1 68 -99 SPO 1997 04 28 11 20 61 5.3 -9 671.50 -59.1 -55.2 -59.2 68 -99 SPO 1997 04 28 11 21 59 5.3 -9 671.50 -59.2 -55.3 -59.3 68 -99 SPO 1997 04 28 11 22 58 5.1 -9 671.50 -59.3 -55.4 -59.3 69 -99 SPO 1997 04 28 11 23 57 5.3 -9 671.50 -59.4 -55.4 -59.3 69 -99 SPO 1997 04 28 11 24 55 5.5 -9 671.50 -59.4 -55.3 -59.3 69 -99 SPO 1997 04 28 11 25 55 5.3 -9 671.40 -59.4 -55.3 -59.3 68 -99 SPO 1997 04 28 11 26 56 5.3 -9 671.40 -59.3 -55.1 -59.3 67 -99 SPO 1997 04 28 11 27 53 5.4 -9 671.40 -59.2 -54.8 -59.3 67 -99 SPO 1997 04 28 11 28 51 5.8 -9 671.40 -59.2 -54.7 -59.2 67 -99 SPO 1997 04 28 11 29 49 6.1 -9 671.40 -59.1 -54.4 -59.2 66 -99 SPO 1997 04 28 11 30 48 6.2 -9 671.40 -58.9 -54.3 -59.1 65 -99 SPO 1997 04 28 11 31 49 6.2 -9 671.40 -58.6 -54.3 -58.9 62 -99 SPO 1997 04 28 11 32 47 5.7 -9 671.40 -58.4 -54.3 -58.8 62 -99 SPO 1997 04 28 11 33 49 5.2 -9 671.40 -58.2 -54.4 -58.6 62 -99 SPO 1997 04 28 11 34 47 4.6 -9 671.40 -58.0 -54.6 -58.5 62 -99 SPO 1997 04 28 11 35 46 4.7 -9 671.40 -58.0 -54.7 -58.5 63 -99 SPO 1997 04 28 11 36 42 5.4 -9 671.40 -58.1 -54.4 -58.5 66 -99 SPO 1997 04 28 11 37 44 7.3 -9 671.40 -57.6 -53.9 -58.2 63 -99 SPO 1997 04 28 11 38 43 7.3 -9 671.40 -56.7 -53.6 -57.4 58 -99 SPO 1997 04 28 11 39 41 7.3 -9 671.40 -56.2 -53.4 -57.0 58 -99 SPO 1997 04 28 11 40 41 7.3 -9 671.30 -55.9 -53.4 -56.6 58 -99 SPO 1997 04 28 11 41 43 7.3 -9 671.30 -55.7 -53.3 -56.4 59 -99 SPO 1997 04 28 11 42 43 7.1 -9 671.30 -55.5 -53.3 -56.3 59 -99 SPO 1997 04 28 11 43 43 6.8 -9 671.30 -55.5 -53.3 -56.3 62 -99 SPO 1997 04 28 11 44 45 6.4 -9 671.40 -55.5 -53.4 -56.2 62 -99 SPO 1997 04 28 11 45 46 6.1 -9 671.40 -55.4 -53.4 -56.2 62 -99 SPO 1997 04 28 11 46 45 5.9 -9 671.30 -55.5 -53.6 -56.2 65 -99 SPO 1997 04 28 11 47 45 5.9 -9 671.30 -55.5 -53.7 -56.2 65 -99 SPO 1997 04 28 11 48 44 6.5 -9 671.30 -55.5 -53.6 -56.2 66 -99 SPO 1997 04 28 11 49 44 6.9 -9 671.30 -55.4 -53.4 -56.0 66 -99 SPO 1997 04 28 11 50 44 7.2 -9 671.30 -55.4 -53.3 -56.0 67 -99 SPO 1997 04 28 11 51 45 7.4 -9 671.30 -55.2 -53.2 -55.8 66 -99 SPO 1997 04 28 11 52 43 7.4 -9 671.20 -55.1 -53.1 -55.6 66 -99 SPO 1997 04 28 11 53 42 7.2 -9 671.20 -55.1 -53.2 -55.6 66 -99 SPO 1997 04 28 11 54 42 7.1 -9 671.20 -55.0 -53.2 -55.5 66 -99 SPO 1997 04 28 11 55 44 7.1 -9 671.20 -55.0 -53.2 -55.4 66 -99 SPO 1997 04 28 11 56 43 6.7 -9 671.20 -55.0 -53.2 -55.4 66 -99 SPO 1997 04 28 11 57 42 6.8 -9 671.20 -55.0 -53.2 -55.4 67 -99 SPO 1997 04 28 11 58 43 6.6 -9 671.20 -55.0 -53.2 -55.4 67 -99 SPO 1997 04 28 11 59 42 6.4 -9 671.20 -55.1 -53.2 -55.4 69 -99 SPO 1997 04 28 12 00 45 6.5 -9 671.20 -55.0 -53.3 -55.4 69 0 SPO 1997 04 28 12 01 46 6.5 -9 671.20 -55.0 -53.2 -55.3 71 -99 SPO 1997 04 28 12 02 45 6.3 -9 671.20 -55.0 -53.2 -55.3 71 -99 SPO 1997 04 28 12 03 47 6.2 -9 671.20 -55.0 -53.3 -55.3 71 -99 SPO 1997 04 28 12 04 48 6.6 -9 671.10 -54.8 -53.2 -55.2 69 -99 SPO 1997 04 28 12 05 47 6.6 -9 671.10 -54.8 -53.2 -55.1 69 -99 SPO 1997 04 28 12 06 47 6.5 -9 671.10 -54.7 -53.2 -55.0 68 -99 SPO 1997 04 28 12 07 48 6.6 -9 671.10 -54.6 -53.2 -54.9 68 -99 SPO 1997 04 28 12 08 49 6.7 -9 671.10 -54.5 -53.2 -54.8 69 -99 SPO 1997 04 28 12 09 48 6.6 -9 671.10 -54.5 -53.2 -54.8 71 -99 SPO 1997 04 28 12 10 50 6.6 -9 671.10 -54.4 -53.2 -54.8 70 -99 SPO 1997 04 28 12 11 52 6.5 -9 671.10 -54.4 -53.2 -54.7 71 -99 SPO 1997 04 28 12 12 53 6.4 -9 671.10 -54.5 -53.3 -54.8 72 -99 SPO 1997 04 28 12 13 53 6.4 -9 671.10 -54.6 -53.4 -54.8 72 -99 SPO 1997 04 28 12 14 54 5.8 -9 671.10 -54.6 -53.6 -54.8 72 -99 SPO 1997 04 28 12 15 55 5.8 -9 671.10 -54.7 -53.7 -54.9 72 -99 SPO 1997 04 28 12 16 57 5.5 -9 671.10 -54.8 -53.8 -55.0 73 -99 SPO 1997 04 28 12 17 57 5.4 -9 671.10 -55.0 -54.0 -55.0 74 -99 SPO 1997 04 28 12 18 56 5.1 -9 671.10 -55.1 -54.0 -55.1 74 -99 SPO 1997 04 28 12 19 53 5.1 -9 671.10 -55.2 -54.0 -55.2 74 -99 SPO 1997 04 28 12 20 51 5.5 -9 671.10 -55.3 -53.9 -55.2 74 -99 SPO 1997 04 28 12 21 48 5.6 -9 671.00 -55.2 -53.8 -55.2 73 -99 SPO 1997 04 28 12 22 44 6.2 -9 671.10 -55.1 -53.7 -55.2 72 -99 SPO 1997 04 28 12 23 44 6.6 -9 671.00 -55.0 -53.5 -55.0 72 -99 SPO 1997 04 28 12 24 44 6.8 -9 671.00 -54.8 -53.4 -54.9 71 -99 SPO 1997 04 28 12 25 43 6.8 -9 671.00 -54.7 -53.2 -54.8 71 -99 SPO 1997 04 28 12 26 45 6.8 -9 671.00 -54.6 -53.3 -54.7 71 -99 SPO 1997 04 28 12 27 46 6.7 -9 671.00 -54.5 -53.2 -54.7 70 -99 SPO 1997 04 28 12 28 48 6.8 -9 671.00 -54.4 -53.2 -54.6 70 -99 SPO 1997 04 28 12 29 48 6.4 -9 671.00 -54.4 -53.2 -54.6 70 -99 SPO 1997 04 28 12 30 50 6.5 -9 671.00 -54.5 -53.4 -54.6 72 -99 SPO 1997 04 28 12 31 52 6.5 -9 671.00 -54.5 -53.4 -54.7 72 -99 SPO 1997 04 28 12 32 53 6.1 -9 671.00 -54.5 -53.4 -54.7 72 -99 SPO 1997 04 28 12 33 55 5.7 -9 671.00 -54.6 -53.5 -54.7 74 -99 SPO 1997 04 28 12 34 53 5.8 -9 671.00 -54.7 -53.6 -54.8 75 -99 SPO 1997 04 28 12 35 54 5.5 -9 671.00 -54.7 -53.6 -54.8 75 -99 SPO 1997 04 28 12 36 54 5.6 -9 671.00 -54.7 -53.7 -54.8 75 -99 SPO 1997 04 28 12 37 51 5.8 -9 671.00 -54.7 -53.7 -54.8 74 -99 SPO 1997 04 28 12 38 52 5.9 -9 671.00 -54.7 -53.6 -54.8 73 -99 SPO 1997 04 28 12 39 51 6.4 -9 671.00 -54.6 -53.4 -54.7 71 -99 SPO 1997 04 28 12 40 49 6.7 -9 671.00 -54.6 -53.4 -54.7 71 -99 SPO 1997 04 28 12 41 48 6.6 -9 671.00 -54.6 -53.4 -54.7 71 -99 SPO 1997 04 28 12 42 47 6.7 -9 671.00 -54.6 -53.4 -54.7 72 -99 SPO 1997 04 28 12 43 48 6.8 -9 671.00 -54.6 -53.3 -54.7 73 -99 SPO 1997 04 28 12 44 49 6.6 -9 671.00 -54.6 -53.3 -54.7 73 -99 SPO 1997 04 28 12 45 51 6.3 -9 671.00 -54.6 -53.2 -54.7 74 -99 SPO 1997 04 28 12 46 51 6.0 -9 671.00 -54.7 -53.2 -54.7 74 -99 SPO 1997 04 28 12 47 52 5.5 -9 671.00 -54.7 -53.3 -54.7 75 -99 SPO 1997 04 28 12 48 53 5.1 -9 671.10 -54.6 -53.4 -54.7 74 -99 SPO 1997 04 28 12 49 54 5.2 -9 671.00 -54.6 -53.5 -54.7 73 -99 SPO 1997 04 28 12 50 54 5.1 -9 671.00 -54.6 -53.5 -54.7 72 -99 SPO 1997 04 28 12 51 55 5.2 -9 671.00 -54.6 -53.5 -54.7 72 -99 SPO 1997 04 28 12 52 55 5.3 -9 671.00 -54.7 -53.5 -54.7 73 -99 SPO 1997 04 28 12 53 54 5.1 -9 671.00 -54.7 -53.5 -54.7 73 -99 SPO 1997 04 28 12 54 55 5.0 -9 671.00 -54.7 -53.4 -54.8 74 -99 SPO 1997 04 28 12 55 54 5.0 -9 671.00 -54.7 -53.4 -54.8 74 -99 SPO 1997 04 28 12 56 55 5.1 -9 671.00 -54.7 -53.4 -54.7 73 -99 SPO 1997 04 28 12 57 58 5.0 -9 671.00 -54.6 -53.5 -54.7 72 -99 SPO 1997 04 28 12 58 58 4.7 -9 671.00 -54.6 -53.6 -54.7 73 -99 SPO 1997 04 28 12 59 58 4.8 -9 671.00 -54.6 -53.7 -54.7 73 -99 SPO 1997 04 28 13 00 58 4.8 -9 671.00 -54.7 -53.8 -54.7 73 0 SPO 1997 04 28 13 01 57 5.0 -9 671.00 -54.8 -53.8 -54.8 74 -99 SPO 1997 04 28 13 02 57 5.2 -9 671.00 -54.8 -53.7 -54.8 74 -99 SPO 1997 04 28 13 03 57 5.3 -9 670.90 -54.8 -53.5 -54.8 74 -99 SPO 1997 04 28 13 04 56 5.2 -9 670.90 -54.8 -53.5 -54.8 74 -99 SPO 1997 04 28 13 05 56 5.0 -9 670.90 -54.8 -53.4 -54.9 74 -99 SPO 1997 04 28 13 06 56 4.8 -9 670.80 -54.8 -53.4 -54.9 75 -99 SPO 1997 04 28 13 07 56 4.8 -9 670.80 -54.8 -53.3 -54.9 75 -99 SPO 1997 04 28 13 08 57 4.5 -9 670.80 -54.8 -53.3 -54.9 75 -99 SPO 1997 04 28 13 09 59 4.7 -9 670.80 -54.9 -53.3 -54.9 76 -99 SPO 1997 04 28 13 10 60 4.8 -9 670.80 -54.9 -53.2 -54.9 75 -99 SPO 1997 04 28 13 11 62 4.7 -9 670.80 -54.8 -53.2 -54.9 75 -99 SPO 1997 04 28 13 12 63 4.7 -9 670.80 -54.8 -53.2 -54.9 73 -99 SPO 1997 04 28 13 13 66 4.8 -9 670.80 -54.9 -53.2 -54.9 73 -99 SPO 1997 04 28 13 14 68 4.8 -9 670.80 -55.0 -53.3 -55.0 74 -99 SPO 1997 04 28 13 15 71 4.6 -9 670.70 -55.0 -53.4 -55.0 73 -99 SPO 1997 04 28 13 16 73 4.5 -9 670.70 -55.1 -53.6 -55.0 74 -99 SPO 1997 04 28 13 17 72 4.1 -9 670.70 -55.2 -53.8 -55.1 75 -99 SPO 1997 04 28 13 18 70 4.2 -9 670.70 -55.2 -53.9 -55.2 75 -99 SPO 1997 04 28 13 19 63 4.2 -9 670.70 -55.3 -54.0 -55.2 75 -99 SPO 1997 04 28 13 20 58 4.2 -9 670.70 -55.4 -53.8 -55.2 76 -99 SPO 1997 04 28 13 21 55 4.3 -9 670.70 -55.4 -53.5 -55.3 76 -99 SPO 1997 04 28 13 22 53 4.5 -9 670.70 -55.4 -53.3 -55.2 76 -99 SPO 1997 04 28 13 23 54 4.9 -9 670.70 -55.2 -53.1 -55.2 74 -99 SPO 1997 04 28 13 24 55 4.5 -9 670.70 -54.9 -53.0 -55.0 71 -99 SPO 1997 04 28 13 25 53 4.5 -9 670.70 -54.6 -53.0 -54.9 69 -99 SPO 1997 04 28 13 26 50 4.4 -9 670.70 -54.5 -52.8 -54.8 69 -99 SPO 1997 04 28 13 27 45 4.7 -9 670.70 -54.4 -52.6 -54.7 68 -99 SPO 1997 04 28 13 28 44 5.2 -9 670.70 -54.2 -52.3 -54.6 68 -99 SPO 1997 04 28 13 29 46 5.4 -9 670.70 -53.8 -52.0 -54.4 67 -99 SPO 1997 04 28 13 30 47 5.5 -9 670.70 -53.4 -51.9 -54.0 64 -99 SPO 1997 04 28 13 31 48 5.5 -9 670.60 -53.1 -51.8 -53.8 64 -99 SPO 1997 04 28 13 32 48 5.5 -9 670.60 -53.0 -51.8 -53.6 66 -99 SPO 1997 04 28 13 33 49 5.2 -9 670.60 -52.8 -51.8 -53.5 66 -99 SPO 1997 04 28 13 34 49 5.2 -9 670.60 -52.7 -51.8 -53.4 68 -99 SPO 1997 04 28 13 35 50 5.6 -9 670.60 -52.6 -51.7 -53.4 68 -99 SPO 1997 04 28 13 36 49 5.7 -9 670.60 -52.6 -51.7 -53.3 68 -99 SPO 1997 04 28 13 37 47 5.2 -9 670.60 -52.5 -51.7 -53.2 68 -99 SPO 1997 04 28 13 38 47 5.7 -9 670.60 -52.5 -51.6 -53.1 69 -99 SPO 1997 04 28 13 39 45 5.8 -9 670.60 -52.5 -51.6 -53.1 69 -99 SPO 1997 04 28 13 40 44 5.8 -9 670.50 -52.4 -51.6 -53.0 70 -99 SPO 1997 04 28 13 41 42 6.0 -9 670.50 -52.4 -51.5 -52.9 70 -99 SPO 1997 04 28 13 42 42 6.0 -9 670.50 -52.4 -51.5 -52.9 71 -99 SPO 1997 04 28 13 43 42 6.5 -9 670.50 -52.3 -51.4 -52.8 71 -99 SPO 1997 04 28 13 44 40 6.5 -9 670.50 -52.3 -51.4 -52.8 71 -99 SPO 1997 04 28 13 45 40 6.8 -9 670.50 -52.2 -51.3 -52.6 71 -99 SPO 1997 04 28 13 46 40 6.5 -9 670.50 -52.1 -51.3 -52.5 72 -99 SPO 1997 04 28 13 47 40 6.6 -9 670.40 -52.1 -51.3 -52.5 70 -99 SPO 1997 04 28 13 48 40 6.9 -9 670.40 -52.1 -51.2 -52.5 72 -99 SPO 1997 04 28 13 49 40 6.6 -9 670.50 -52.1 -51.2 -52.4 72 -99 SPO 1997 04 28 13 50 41 6.6 -9 670.40 -52.1 -51.3 -52.4 74 -99 SPO 1997 04 28 13 51 40 6.1 -9 670.40 -52.0 -51.3 -52.4 73 -99 SPO 1997 04 28 13 52 39 6.3 -9 670.40 -52.0 -51.4 -52.3 74 -99 SPO 1997 04 28 13 53 40 6.7 -9 670.40 -52.0 -51.2 -52.3 74 -99 SPO 1997 04 28 13 54 39 6.9 -9 670.40 -52.0 -51.2 -52.2 75 -99 SPO 1997 04 28 13 55 37 7.6 -9 670.40 -51.9 -51.0 -52.2 75 -99 SPO 1997 04 28 13 56 36 7.3 -9 670.40 -51.8 -50.9 -52.0 75 -99 SPO 1997 04 28 13 57 35 7.4 -9 670.40 -51.6 -50.9 -51.9 74 -99 SPO 1997 04 28 13 58 33 8.0 -9 670.30 -51.5 -50.8 -51.8 74 -99 SPO 1997 04 28 13 59 31 8.7 -9 670.30 -51.4 -50.6 -51.6 73 -99 SPO 1997 04 28 14 00 31 8.8 -9 670.30 -51.3 -50.4 -51.5 73 0 SPO 1997 04 28 14 01 31 8.8 -9 670.20 -51.2 -50.3 -51.4 72 -99 SPO 1997 04 28 14 02 32 9.1 -9 670.20 -51.1 -50.2 -51.4 72 -99 SPO 1997 04 28 14 03 32 9.4 -9 670.20 -51.0 -50.2 -51.2 72 -99 SPO 1997 04 28 14 04 33 9.1 -9 670.10 -50.9 -50.2 -51.2 72 -99 SPO 1997 04 28 14 05 33 9.2 -9 670.20 -50.9 -50.3 -51.2 72 -99 SPO 1997 04 28 14 06 34 8.9 -9 670.10 -50.9 -50.4 -51.2 74 -99 SPO 1997 04 28 14 07 33 8.7 -9 670.20 -50.9 -50.4 -51.2 75 -99 SPO 1997 04 28 14 08 33 8.7 -9 670.20 -50.9 -50.4 -51.1 75 -99 SPO 1997 04 28 14 09 33 8.6 -9 670.20 -50.8 -50.4 -51.1 75 -99 SPO 1997 04 28 14 10 33 9.0 -9 670.10 -50.8 -50.4 -51.1 76 -99 SPO 1997 04 28 14 11 33 8.8 -9 670.10 -50.8 -50.3 -51.0 76 -99 SPO 1997 04 28 14 12 33 9.2 -9 670.10 -50.9 -50.3 -51.0 76 -99 SPO 1997 04 28 14 13 32 9.2 -9 670.10 -50.8 -50.3 -51.0 75 -99 SPO 1997 04 28 14 14 32 8.8 -9 670.10 -50.8 -50.3 -51.0 75 -99 SPO 1997 04 28 14 15 32 9.0 -9 670.10 -50.8 -50.2 -51.0 76 -99 SPO 1997 04 28 14 16 32 8.9 -9 670.20 -50.8 -50.2 -50.9 77 -99 SPO 1997 04 28 14 17 32 8.5 -9 670.20 -50.7 -50.2 -50.9 76 -99 SPO 1997 04 28 14 18 33 8.3 -9 670.20 -50.7 -50.2 -50.9 77 -99 SPO 1997 04 28 14 19 34 8.3 -9 670.20 -50.7 -50.2 -50.9 78 -99 SPO 1997 04 28 14 20 32 8.1 -9 670.20 -50.8 -50.2 -50.9 78 -99 SPO 1997 04 28 14 21 31 8.3 -9 670.20 -50.8 -50.2 -50.9 78 -99 SPO 1997 04 28 14 22 31 8.4 -9 670.20 -50.8 -50.2 -50.9 78 -99 SPO 1997 04 28 14 23 31 8.6 -9 670.20 -50.7 -50.3 -50.9 76 -99 SPO 1997 04 28 14 24 29 8.9 -9 670.20 -50.8 -50.4 -50.9 77 -99 SPO 1997 04 28 14 25 30 9.4 -9 670.10 -50.8 -50.3 -50.9 76 -99 SPO 1997 04 28 14 26 30 9.4 -9 670.10 -50.8 -50.3 -50.9 76 -99 SPO 1997 04 28 14 27 30 10.1 -9 670.10 -50.8 -50.3 -50.9 77 -99 SPO 1997 04 28 14 28 30 10.2 -9 670.10 -50.8 -50.2 -50.9 77 -99 SPO 1997 04 28 14 29 31 9.6 -9 670.10 -50.8 -50.3 -50.9 77 -99 SPO 1997 04 28 14 30 30 9.7 -9 670.10 -50.9 -50.2 -50.9 78 -99 SPO 1997 04 28 14 31 29 9.2 -9 670.20 -50.9 -50.2 -50.9 78 -99 SPO 1997 04 28 14 32 29 9.1 -9 670.20 -50.9 -50.2 -50.9 78 -99 SPO 1997 04 28 14 33 30 9.1 -9 670.20 -50.9 -50.2 -51.0 78 -99 SPO 1997 04 28 14 34 30 8.8 -9 670.20 -50.9 -50.2 -51.0 78 -99 SPO 1997 04 28 14 35 30 9.0 -9 670.20 -50.9 -50.3 -51.0 78 -99 SPO 1997 04 28 14 36 30 9.1 -9 670.20 -50.9 -50.2 -51.0 77 -99 SPO 1997 04 28 14 37 30 8.9 -9 670.20 -50.9 -50.2 -50.9 76 -99 SPO 1997 04 28 14 38 30 9.3 -9 670.20 -50.8 -50.2 -50.9 75 -99 SPO 1997 04 28 14 39 30 8.9 -9 670.20 -50.8 -50.2 -50.8 75 -99 SPO 1997 04 28 14 40 29 9.0 -9 670.20 -50.8 -50.1 -50.8 75 -99 SPO 1997 04 28 14 41 30 9.3 -9 670.20 -50.7 -50.1 -50.8 74 -99 SPO 1997 04 28 14 42 29 9.1 -9 670.20 -50.6 -50.1 -50.7 75 -99 SPO 1997 04 28 14 43 30 9.0 -9 670.20 -50.6 -50.1 -50.7 76 -99 SPO 1997 04 28 14 44 30 8.9 -9 670.20 -50.6 -50.1 -50.6 76 -99 SPO 1997 04 28 14 45 29 8.9 -9 670.20 -50.6 -50.1 -50.7 75 -99 SPO 1997 04 28 14 46 30 8.9 -9 670.20 -50.6 -50.0 -50.6 75 -99 SPO 1997 04 28 14 47 30 9.4 -9 670.20 -50.6 -50.0 -50.7 75 -99 SPO 1997 04 28 14 48 31 9.8 -9 670.20 -50.5 -50.0 -50.7 74 -99 SPO 1997 04 28 14 49 31 9.2 -9 670.20 -50.5 -50.0 -50.6 74 -99 SPO 1997 04 28 14 50 31 8.8 -9 670.20 -50.6 -50.0 -50.6 75 -99 SPO 1997 04 28 14 51 31 8.6 -9 670.20 -50.6 -50.0 -50.7 76 -99 SPO 1997 04 28 14 52 32 8.9 -9 670.20 -50.6 -50.0 -50.7 76 -99 SPO 1997 04 28 14 53 32 8.7 -9 670.20 -50.6 -50.0 -50.7 77 -99 SPO 1997 04 28 14 54 32 8.5 -9 670.20 -50.6 -50.0 -50.8 77 -99 SPO 1997 04 28 14 55 32 9.0 -9 670.20 -50.7 -50.0 -50.8 77 -99 SPO 1997 04 28 14 56 30 9.1 -9 670.20 -50.7 -50.0 -50.8 77 -99 SPO 1997 04 28 14 57 31 8.9 -9 670.20 -50.7 -49.9 -50.8 76 -99 SPO 1997 04 28 14 58 30 9.1 -9 670.10 -50.6 -49.9 -50.7 74 -99 SPO 1997 04 28 14 59 30 8.8 -9 670.10 -50.6 -50.0 -50.7 73 -99 SPO 1997 04 28 15 00 30 8.8 -9 670.10 -50.6 -50.0 -50.7 73 0 SPO 1997 04 28 15 01 29 8.9 -9 670.20 -50.6 -50.0 -50.7 74 -99 SPO 1997 04 28 15 02 29 8.7 -9 670.20 -50.6 -50.1 -50.6 75 -99 SPO 1997 04 28 15 03 29 8.4 -9 670.20 -50.6 -50.1 -50.7 75 -99 SPO 1997 04 28 15 04 30 8.8 -9 670.20 -50.7 -50.1 -50.7 77 -99 SPO 1997 04 28 15 05 30 8.6 -9 670.20 -50.6 -50.0 -50.7 76 -99 SPO 1997 04 28 15 06 29 8.4 -9 670.20 -50.6 -50.1 -50.7 76 -99 SPO 1997 04 28 15 07 30 8.4 -9 670.20 -50.6 -50.1 -50.7 76 -99 SPO 1997 04 28 15 08 30 8.1 -9 670.10 -50.6 -50.1 -50.7 76 -99 SPO 1997 04 28 15 09 30 8.0 -9 670.20 -50.6 -50.1 -50.8 75 -99 SPO 1997 04 28 15 10 30 7.9 -9 670.20 -50.7 -50.1 -50.8 76 -99 SPO 1997 04 28 15 11 31 7.6 -9 670.20 -50.6 -50.1 -50.7 73 -99 SPO 1997 04 28 15 12 30 8.0 -9 670.20 -50.6 -50.1 -50.7 73 -99 SPO 1997 04 28 15 13 29 7.6 -9 670.20 -50.6 -50.0 -50.7 73 -99 SPO 1997 04 28 15 14 28 7.9 -9 670.20 -50.6 -50.1 -50.6 73 -99 SPO 1997 04 28 15 15 29 7.8 -9 670.20 -50.6 -50.1 -50.6 73 -99 SPO 1997 04 28 15 16 29 7.9 -9 670.10 -50.5 -50.1 -50.6 72 -99 SPO 1997 04 28 15 17 26 8.2 -9 670.10 -50.5 -50.1 -50.6 73 -99 SPO 1997 04 28 15 18 26 7.9 -9 670.10 -50.4 -50.1 -50.5 73 -99 SPO 1997 04 28 15 19 26 7.9 -9 670.10 -50.4 -50.1 -50.5 73 -99 SPO 1997 04 28 15 20 25 7.9 -9 670.10 -50.4 -50.0 -50.4 74 -99 SPO 1997 04 28 15 21 23 7.9 -9 670.10 -50.4 -50.1 -50.5 74 -99 SPO 1997 04 28 15 22 24 8.3 -9 670.10 -50.4 -50.0 -50.5 74 -99 SPO 1997 04 28 15 23 25 8.1 -9 670.10 -50.4 -50.0 -50.4 74 -99 SPO 1997 04 28 15 24 24 8.4 -9 670.10 -50.3 -50.0 -50.4 73 -99 SPO 1997 04 28 15 25 24 8.3 -9 670.10 -50.3 -50.0 -50.4 73 -99 SPO 1997 04 28 15 26 25 8.2 -9 670.00 -50.3 -50.0 -50.4 74 -99 SPO 1997 04 28 15 27 26 8.3 -9 670.00 -50.4 -50.0 -50.5 75 -99 SPO 1997 04 28 15 28 26 7.9 -9 670.00 -50.4 -50.0 -50.5 76 -99 SPO 1997 04 28 15 29 26 8.3 -9 670.00 -50.4 -50.0 -50.5 76 -99 SPO 1997 04 28 15 30 27 8.4 -9 670.00 -50.4 -50.0 -50.5 76 -99 SPO 1997 04 28 15 31 28 8.2 -9 670.00 -50.4 -49.9 -50.5 76 -99 SPO 1997 04 28 15 32 28 8.3 -9 670.00 -50.4 -49.9 -50.5 75 -99 SPO 1997 04 28 15 33 27 8.1 -9 670.00 -50.4 -49.9 -50.5 74 -99 SPO 1997 04 28 15 34 27 8.4 -9 670.00 -50.4 -50.0 -50.5 73 -99 SPO 1997 04 28 15 35 27 8.6 -9 670.00 -50.4 -50.0 -50.5 73 -99 SPO 1997 04 28 15 36 26 8.7 -9 670.00 -50.4 -50.0 -50.5 73 -99 SPO 1997 04 28 15 37 26 8.6 -9 670.00 -50.4 -50.0 -50.5 74 -99 SPO 1997 04 28 15 38 25 9.1 -9 669.90 -50.5 -50.0 -50.5 75 -99 SPO 1997 04 28 15 39 25 9.1 -9 669.90 -50.4 -50.0 -50.5 74 -99 SPO 1997 04 28 15 40 24 9.2 -9 669.90 -50.4 -49.9 -50.5 75 -99 SPO 1997 04 28 15 41 24 9.6 -9 669.80 -50.4 -49.9 -50.4 75 -99 SPO 1997 04 28 15 42 24 9.6 -9 669.80 -50.3 -49.9 -50.4 75 -99 SPO 1997 04 28 15 43 24 9.7 -9 669.80 -50.3 -49.9 -50.4 74 -99 SPO 1997 04 28 15 44 24 9.9 -9 669.70 -50.3 -49.8 -50.4 73 -99 SPO 1997 04 28 15 45 24 10.2 -9 669.70 -50.4 -49.8 -50.5 74 -99 SPO 1997 04 28 15 46 24 10.2 -9 669.70 -50.4 -49.7 -50.4 73 -99 SPO 1997 04 28 15 47 25 10.4 -9 669.70 -50.4 -49.7 -50.4 73 -99 SPO 1997 04 28 15 48 25 10.5 -9 669.70 -50.3 -49.7 -50.4 72 -99 SPO 1997 04 28 15 49 25 10.3 -9 669.70 -50.3 -49.7 -50.4 72 -99 SPO 1997 04 28 15 50 24 10.6 -9 669.60 -50.3 -49.7 -50.4 72 -99 SPO 1997 04 28 15 51 24 11.1 -9 669.60 -50.2 -49.6 -50.3 72 -99 SPO 1997 04 28 15 52 24 11.2 -9 669.60 -50.2 -49.6 -50.3 72 -99 SPO 1997 04 28 15 53 24 11.0 -9 669.60 -50.2 -49.6 -50.2 72 -99 SPO 1997 04 28 15 54 23 10.3 -9 669.70 -50.2 -49.6 -50.2 72 -99 SPO 1997 04 28 15 55 24 10.3 -9 669.70 -50.2 -49.7 -50.2 73 -99 SPO 1997 04 28 15 56 25 10.1 -9 669.70 -50.2 -49.7 -50.3 73 -99 SPO 1997 04 28 15 57 25 10.0 -9 669.70 -50.2 -49.7 -50.3 72 -99 SPO 1997 04 28 15 58 26 9.6 -9 669.70 -50.2 -49.7 -50.3 72 -99 SPO 1997 04 28 15 59 27 9.7 -9 669.70 -50.3 -49.7 -50.3 72 -99 SPO 1997 04 28 16 00 27 9.7 -9 669.70 -50.3 -49.7 -50.3 72 0 SPO 1997 04 28 16 01 27 9.9 -9 669.70 -50.2 -49.7 -50.3 72 -99 SPO 1997 04 28 16 02 28 9.8 -9 669.70 -50.2 -49.7 -50.3 72 -99 SPO 1997 04 28 16 03 27 9.9 -9 669.70 -50.2 -49.7 -50.3 72 -99 SPO 1997 04 28 16 04 28 9.8 -9 669.70 -50.2 -49.6 -50.3 72 -99 SPO 1997 04 28 16 05 28 9.3 -9 669.70 -50.2 -49.6 -50.2 72 -99 SPO 1997 04 28 16 06 28 9.5 -9 669.70 -50.2 -49.6 -50.3 72 -99 SPO 1997 04 28 16 07 27 9.3 -9 669.70 -50.1 -49.6 -50.2 71 -99 SPO 1997 04 28 16 08 28 9.2 -9 669.70 -50.1 -49.6 -50.2 71 -99 SPO 1997 04 28 16 09 27 9.0 -9 669.70 -50.1 -49.6 -50.1 71 -99 SPO 1997 04 28 16 10 27 8.8 -9 669.70 -50.0 -49.6 -50.1 69 -99 SPO 1997 04 28 16 11 27 9.1 -9 669.70 -50.0 -49.6 -50.0 70 -99 SPO 1997 04 28 16 12 26 8.8 -9 669.70 -50.0 -49.6 -50.0 70 -99 SPO 1997 04 28 16 13 26 8.7 -9 669.70 -50.0 -49.7 -50.0 71 -99 SPO 1997 04 28 16 14 25 8.9 -9 669.70 -49.9 -49.6 -50.0 71 -99 SPO 1997 04 28 16 15 25 9.1 -9 669.70 -49.9 -49.6 -50.0 72 -99 SPO 1997 04 28 16 16 26 9.3 -9 669.70 -49.8 -49.6 -49.9 71 -99 SPO 1997 04 28 16 17 26 9.1 -9 669.70 -49.8 -49.6 -49.9 72 -99 SPO 1997 04 28 16 18 26 8.9 -9 669.70 -49.9 -49.6 -49.9 73 -99 SPO 1997 04 28 16 19 26 8.8 -9 669.70 -49.9 -49.5 -49.9 73 -99 SPO 1997 04 28 16 20 25 8.7 -9 669.80 -49.8 -49.5 -49.9 72 -99 SPO 1997 04 28 16 21 25 9.1 -9 669.80 -49.7 -49.5 -49.8 70 -99 SPO 1997 04 28 16 22 24 8.9 -9 669.70 -49.7 -49.5 -49.9 70 -99 SPO 1997 04 28 16 23 24 8.8 -9 669.80 -49.7 -49.5 -49.8 70 -99 SPO 1997 04 28 16 24 24 8.6 -9 669.70 -49.7 -49.4 -49.8 71 -99 SPO 1997 04 28 16 25 24 9.2 -9 669.70 -49.7 -49.4 -49.8 71 -99 SPO 1997 04 28 16 26 24 9.0 -9 669.70 -49.7 -49.4 -49.8 71 -99 SPO 1997 04 28 16 27 24 8.8 -9 669.70 -49.6 -49.4 -49.8 70 -99 SPO 1997 04 28 16 28 23 8.9 -9 669.70 -49.6 -49.4 -49.8 70 -99 SPO 1997 04 28 16 29 24 9.2 -9 669.70 -49.6 -49.4 -49.7 72 -99 SPO 1997 04 28 16 30 24 8.7 -9 669.70 -49.6 -49.4 -49.6 73 -99 SPO 1997 04 28 16 31 25 8.3 -9 669.70 -49.6 -49.4 -49.7 73 -99 SPO 1997 04 28 16 32 26 8.4 -9 669.70 -49.6 -49.4 -49.6 72 -99 SPO 1997 04 28 16 33 27 8.3 -9 669.70 -49.6 -49.4 -49.6 72 -99 SPO 1997 04 28 16 34 28 8.7 -9 669.70 -49.6 -49.4 -49.6 72 -99 SPO 1997 04 28 16 35 28 8.3 -9 669.70 -49.6 -49.4 -49.6 72 -99 SPO 1997 04 28 16 36 29 8.2 -9 669.70 -49.6 -49.4 -49.6 73 -99 SPO 1997 04 28 16 37 29 8.4 -9 669.70 -49.6 -49.4 -49.6 73 -99 SPO 1997 04 28 16 38 29 8.0 -9 669.70 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 28 16 39 29 8.4 -9 669.70 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 28 16 40 28 8.4 -9 669.70 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 28 16 41 28 8.4 -9 669.70 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 28 16 42 27 8.7 -9 669.70 -49.5 -49.3 -49.6 73 -99 SPO 1997 04 28 16 43 27 8.8 -9 669.70 -49.4 -49.3 -49.5 73 -99 SPO 1997 04 28 16 44 27 8.6 -9 669.70 -49.4 -49.3 -49.5 72 -99 SPO 1997 04 28 16 45 25 8.6 -9 669.70 -49.4 -49.3 -49.5 72 -99 SPO 1997 04 28 16 46 25 8.4 -9 669.70 -49.4 -49.3 -49.5 70 -99 SPO 1997 04 28 16 47 23 8.7 -9 669.70 -49.5 -49.3 -49.5 73 -99 SPO 1997 04 28 16 48 23 9.2 -9 669.70 -49.4 -49.3 -49.5 73 -99 SPO 1997 04 28 16 49 22 8.4 -9 669.70 -49.4 -49.3 -49.4 73 -99 SPO 1997 04 28 16 50 23 8.8 -9 669.70 -49.4 -49.3 -49.4 74 -99 SPO 1997 04 28 16 51 23 9.2 -9 669.70 -49.4 -49.3 -49.4 75 -99 SPO 1997 04 28 16 52 22 9.1 -9 669.70 -49.3 -49.3 -49.4 74 -99 SPO 1997 04 28 16 53 23 8.7 -9 669.60 -49.4 -49.2 -49.4 75 -99 SPO 1997 04 28 16 54 23 8.8 -9 669.60 -49.4 -49.2 -49.4 75 -99 SPO 1997 04 28 16 55 23 9.2 -9 669.60 -49.3 -49.2 -49.4 73 -99 SPO 1997 04 28 16 56 22 9.3 -9 669.60 -49.3 -49.2 -49.4 73 -99 SPO 1997 04 28 16 57 22 9.5 -9 669.60 -49.3 -49.2 -49.3 73 -99 SPO 1997 04 28 16 58 22 9.2 -9 669.60 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 28 16 59 22 10.0 -9 669.60 -49.2 -49.1 -49.3 72 -99 SPO 1997 04 28 17 00 23 9.7 -9 669.50 -49.2 -49.1 -49.3 73 0 SPO 1997 04 28 17 01 24 9.6 -9 669.50 -49.2 -49.1 -49.3 73 -99 SPO 1997 04 28 17 02 24 10.0 -9 669.40 -49.2 -49.0 -49.3 73 -99 SPO 1997 04 28 17 03 23 10.1 -9 669.40 -49.2 -49.0 -49.3 73 -99 SPO 1997 04 28 17 04 23 10.3 -9 669.40 -49.2 -49.1 -49.2 73 -99 SPO 1997 04 28 17 05 23 10.3 -9 669.40 -49.2 -49.1 -49.2 73 -99 SPO 1997 04 28 17 06 22 9.7 -9 669.40 -49.1 -49.0 -49.2 72 -99 SPO 1997 04 28 17 07 21 10.3 -9 669.40 -49.1 -49.1 -49.2 72 -99 SPO 1997 04 28 17 08 20 10.1 -9 669.40 -49.1 -49.0 -49.2 71 -99 SPO 1997 04 28 17 09 19 10.3 -9 669.40 -49.1 -49.0 -49.2 71 -99 SPO 1997 04 28 17 10 19 9.8 -9 669.50 -49.1 -49.0 -49.2 72 -99 SPO 1997 04 28 17 11 20 10.2 -9 669.50 -49.1 -49.0 -49.2 72 -99 SPO 1997 04 28 17 12 20 10.0 -9 669.40 -49.1 -49.0 -49.2 73 -99 SPO 1997 04 28 17 13 20 9.4 -9 669.40 -49.1 -49.0 -49.2 73 -99 SPO 1997 04 28 17 14 20 10.0 -9 669.40 -49.1 -49.0 -49.2 73 -99 SPO 1997 04 28 17 15 21 10.2 -9 669.40 -49.1 -48.9 -49.2 72 -99 SPO 1997 04 28 17 16 20 10.2 -9 669.40 -49.1 -48.9 -49.1 73 -99 SPO 1997 04 28 17 17 20 10.5 -9 669.40 -49.0 -48.9 -49.1 72 -99 SPO 1997 04 28 17 18 20 10.1 -9 669.40 -48.9 -48.9 -49.1 70 -99 SPO 1997 04 28 17 19 19 10.3 -9 669.40 -49.0 -48.8 -49.0 71 -99 SPO 1997 04 28 17 20 19 10.2 -9 669.40 -49.0 -48.8 -49.0 71 -99 SPO 1997 04 28 17 21 19 10.3 -9 669.40 -48.9 -48.8 -49.0 70 -99 SPO 1997 04 28 17 22 19 10.1 -9 669.40 -48.9 -48.8 -49.0 72 -99 SPO 1997 04 28 17 23 19 10.1 -9 669.40 -48.9 -48.8 -49.0 73 -99 SPO 1997 04 28 17 24 19 10.0 -9 669.40 -48.9 -48.8 -49.0 73 -99 SPO 1997 04 28 17 25 18 10.0 -9 669.40 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 28 17 26 18 10.5 -9 669.40 -48.9 -48.8 -49.0 74 -99 SPO 1997 04 28 17 27 19 10.5 -9 669.40 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 17 28 20 10.7 -9 669.40 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 17 29 20 10.5 -9 669.40 -48.9 -48.8 -48.9 74 -99 SPO 1997 04 28 17 30 20 10.6 -9 669.40 -48.9 -48.8 -48.9 74 -99 SPO 1997 04 28 17 31 20 10.7 -9 669.40 -48.8 -48.7 -48.9 73 -99 SPO 1997 04 28 17 32 19 10.3 -9 669.40 -48.8 -48.7 -48.8 72 -99 SPO 1997 04 28 17 33 18 10.1 -9 669.50 -48.8 -48.7 -48.8 72 -99 SPO 1997 04 28 17 34 18 10.1 -9 669.50 -48.8 -48.7 -48.9 72 -99 SPO 1997 04 28 17 35 18 9.7 -9 669.50 -48.8 -48.7 -48.8 73 -99 SPO 1997 04 28 17 36 17 9.8 -9 669.40 -48.8 -48.7 -48.9 73 -99 SPO 1997 04 28 17 37 19 9.6 -9 669.40 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 17 38 19 10.2 -9 669.40 -48.8 -48.6 -48.9 74 -99 SPO 1997 04 28 17 39 20 10.0 -9 669.40 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 40 20 9.6 -9 669.40 -48.8 -48.6 -48.9 74 -99 SPO 1997 04 28 17 41 20 10.1 -9 669.40 -48.8 -48.7 -48.9 74 -99 SPO 1997 04 28 17 42 20 9.7 -9 669.40 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 17 43 21 10.0 -9 669.40 -48.8 -48.7 -48.8 73 -99 SPO 1997 04 28 17 44 22 9.9 -9 669.30 -48.8 -48.7 -48.8 73 -99 SPO 1997 04 28 17 45 21 10.9 -9 669.30 -48.8 -48.7 -48.8 73 -99 SPO 1997 04 28 17 46 21 10.0 -9 669.30 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 28 17 47 20 10.9 -9 669.30 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 17 48 21 10.8 -9 669.30 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 17 49 19 10.5 -9 669.30 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 17 50 20 10.7 -9 669.30 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 51 20 10.8 -9 669.20 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 52 20 10.7 -9 669.20 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 53 20 11.2 -9 669.20 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 54 20 10.8 -9 669.20 -48.7 -48.6 -48.8 72 -99 SPO 1997 04 28 17 55 20 11.4 -9 669.20 -48.7 -48.6 -48.8 73 -99 SPO 1997 04 28 17 56 19 11.1 -9 669.20 -48.6 -48.6 -48.8 72 -99 SPO 1997 04 28 17 57 18 11.2 -9 669.20 -48.6 -48.6 -48.8 72 -99 SPO 1997 04 28 17 58 20 11.0 -9 669.30 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 17 59 19 11.4 -9 669.30 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 18 00 19 11.1 -9 669.20 -48.7 -48.7 -48.8 74 0 SPO 1997 04 28 18 01 19 11.2 -9 669.20 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 18 02 20 10.9 -9 669.20 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 18 03 19 10.2 -9 669.20 -48.7 -48.8 -48.8 75 -99 SPO 1997 04 28 18 04 20 11.3 -9 669.20 -48.8 -48.8 -48.8 76 -99 SPO 1997 04 28 18 05 20 11.3 -9 669.20 -48.7 -48.8 -48.8 74 -99 SPO 1997 04 28 18 06 21 11.6 -9 669.20 -48.8 -48.8 -48.8 74 -99 SPO 1997 04 28 18 07 21 11.4 -9 669.10 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 18 08 21 10.9 -9 669.10 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 18 09 21 11.6 -9 669.00 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 18 10 22 11.5 -9 669.10 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 18 11 20 12.5 -9 669.00 -48.8 -48.7 -48.8 74 -99 SPO 1997 04 28 18 12 20 13.1 -9 669.00 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 18 13 21 12.4 -9 669.00 -48.7 -48.6 -48.8 75 -99 SPO 1997 04 28 18 14 21 12.8 -9 669.00 -48.7 -48.7 -48.8 75 -99 SPO 1997 04 28 18 15 22 12.6 -9 669.00 -48.6 -48.7 -48.8 74 -99 SPO 1997 04 28 18 16 22 12.8 -9 669.00 -48.7 -48.7 -48.8 74 -99 SPO 1997 04 28 18 17 21 12.6 -9 669.00 -48.7 -48.6 -48.8 74 -99 SPO 1997 04 28 18 18 21 11.7 -9 669.00 -48.7 -48.7 -48.8 73 -99 SPO 1997 04 28 18 19 21 12.1 -9 669.00 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 18 20 21 12.2 -9 669.00 -48.7 -48.8 -48.8 74 -99 SPO 1997 04 28 18 21 21 12.0 -9 669.00 -48.7 -48.8 -48.9 74 -99 SPO 1997 04 28 18 22 19 12.0 -9 669.00 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 18 23 19 12.5 -9 669.00 -48.8 -48.8 -48.9 74 -99 SPO 1997 04 28 18 24 20 12.2 -9 669.00 -48.8 -48.8 -49.0 74 -99 SPO 1997 04 28 18 25 19 12.6 -9 668.90 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 28 18 26 19 12.4 -9 669.00 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 28 18 27 20 11.9 -9 669.00 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 28 18 28 20 12.5 -9 668.90 -49.0 -48.9 -49.1 74 -99 SPO 1997 04 28 18 29 20 12.7 -9 668.90 -49.0 -48.9 -49.1 74 -99 SPO 1997 04 28 18 30 19 12.3 -9 668.90 -49.0 -49.0 -49.2 74 -99 SPO 1997 04 28 18 31 19 12.9 -9 668.80 -49.0 -49.0 -49.2 74 -99 SPO 1997 04 28 18 32 19 12.4 -9 668.80 -49.0 -49.0 -49.2 74 -99 SPO 1997 04 28 18 33 19 13.2 -9 668.80 -49.1 -49.0 -49.2 75 -99 SPO 1997 04 28 18 34 20 12.5 -9 668.80 -49.1 -49.0 -49.3 75 -99 SPO 1997 04 28 18 35 19 13.3 -9 668.80 -49.1 -49.1 -49.3 74 -99 SPO 1997 04 28 18 36 20 13.1 -9 668.80 -49.1 -49.1 -49.3 74 -99 SPO 1997 04 28 18 37 18 12.4 -9 668.80 -49.2 -49.2 -49.3 74 -99 SPO 1997 04 28 18 38 19 12.9 -9 668.80 -49.2 -49.2 -49.3 74 -99 SPO 1997 04 28 18 39 19 12.3 -9 668.80 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 28 18 40 19 12.4 -9 668.80 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 28 18 41 18 12.7 -9 668.80 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 28 18 42 18 13.2 -9 668.80 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 28 18 43 20 13.4 -9 668.70 -49.2 -49.2 -49.3 72 -99 SPO 1997 04 28 18 44 18 13.0 -9 668.70 -49.2 -49.1 -49.3 73 -99 SPO 1997 04 28 18 45 17 13.9 -9 668.70 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 28 18 46 18 13.9 -9 668.70 -49.2 -49.1 -49.2 73 -99 SPO 1997 04 28 18 47 18 13.1 -9 668.60 -49.2 -49.1 -49.3 73 -99 SPO 1997 04 28 18 48 18 13.0 -9 668.60 -49.2 -49.2 -49.4 73 -99 SPO 1997 04 28 18 49 17 12.8 -9 668.60 -49.2 -49.2 -49.4 73 -99 SPO 1997 04 28 18 50 17 13.6 -9 668.60 -49.2 -49.2 -49.4 73 -99 SPO 1997 04 28 18 51 18 13.5 -9 668.60 -49.2 -49.2 -49.4 72 -99 SPO 1997 04 28 18 52 17 13.1 -9 668.60 -49.3 -49.2 -49.5 73 -99 SPO 1997 04 28 18 53 18 12.8 -9 668.60 -49.3 -49.2 -49.5 72 -99 SPO 1997 04 28 18 54 17 13.9 -9 668.60 -49.3 -49.3 -49.5 72 -99 SPO 1997 04 28 18 55 17 13.4 -9 668.60 -49.4 -49.4 -49.5 73 -99 SPO 1997 04 28 18 56 17 12.9 -9 668.60 -49.4 -49.4 -49.6 73 -99 SPO 1997 04 28 18 57 17 13.2 -9 668.60 -49.5 -49.5 -49.6 75 -99 SPO 1997 04 28 18 58 17 13.0 -9 668.60 -49.5 -49.5 -49.7 74 -99 SPO 1997 04 28 18 59 17 14.0 -9 668.60 -49.6 -49.5 -49.7 75 -99 SPO 1997 04 28 19 00 17 13.3 -9 668.60 -49.6 -49.5 -49.8 75 0 SPO 1997 04 28 19 01 17 13.5 -9 668.60 -49.6 -49.5 -49.8 75 -99 SPO 1997 04 28 19 02 17 12.8 -9 668.60 -49.6 -49.6 -49.8 74 -99 SPO 1997 04 28 19 03 17 12.5 -9 668.60 -49.7 -49.6 -49.8 75 -99 SPO 1997 04 28 19 04 18 12.9 -9 668.60 -49.7 -49.6 -49.8 74 -99 SPO 1997 04 28 19 05 17 13.3 -9 668.60 -49.7 -49.6 -49.8 73 -99 SPO 1997 04 28 19 06 17 13.5 -9 668.60 -49.6 -49.6 -49.9 72 -99 SPO 1997 04 28 19 07 18 12.8 -9 668.60 -49.7 -49.6 -49.9 73 -99 SPO 1997 04 28 19 08 17 13.4 -9 668.60 -49.7 -49.6 -49.9 73 -99 SPO 1997 04 28 19 09 18 12.2 -9 668.60 -49.8 -49.6 -50.0 73 -99 SPO 1997 04 28 19 10 18 12.9 -9 668.70 -49.8 -49.7 -50.0 73 -99 SPO 1997 04 28 19 11 17 13.3 -9 668.60 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 28 19 12 17 12.7 -9 668.60 -49.8 -49.6 -49.9 73 -99 SPO 1997 04 28 19 13 17 13.2 -9 668.60 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 28 19 14 17 13.6 -9 668.60 -49.8 -49.7 -50.0 73 -99 SPO 1997 04 28 19 15 18 13.3 -9 668.60 -49.9 -49.8 -50.0 73 -99 SPO 1997 04 28 19 16 19 13.5 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 17 19 13.1 -9 668.60 -49.9 -49.8 -50.0 71 -99 SPO 1997 04 28 19 18 19 13.3 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 19 19 13.1 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 20 18 13.5 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 21 18 12.9 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 22 19 13.2 -9 668.60 -49.9 -49.8 -50.0 72 -99 SPO 1997 04 28 19 23 20 12.5 -9 668.60 -49.8 -49.8 -50.0 72 -99 SPO 1997 04 28 19 24 20 13.3 -9 668.60 -49.8 -49.7 -50.0 71 -99 SPO 1997 04 28 19 25 21 13.8 -9 668.60 -49.8 -49.7 -49.9 70 -99 SPO 1997 04 28 19 26 21 12.9 -9 668.50 -49.8 -49.7 -49.9 70 -99 SPO 1997 04 28 19 27 21 13.6 -9 668.50 -49.8 -49.7 -49.9 70 -99 SPO 1997 04 28 19 28 22 13.7 -9 668.50 -49.8 -49.6 -49.9 69 -99 SPO 1997 04 28 19 29 21 13.6 -9 668.50 -49.7 -49.6 -49.8 68 -99 SPO 1997 04 28 19 30 22 13.4 -9 668.50 -49.7 -49.6 -49.8 68 -99 SPO 1997 04 28 19 31 22 13.0 -9 668.40 -49.7 -49.7 -49.9 69 -99 SPO 1997 04 28 19 32 22 13.1 -9 668.40 -49.8 -49.7 -49.9 71 -99 SPO 1997 04 28 19 33 21 13.9 -9 668.40 -49.7 -49.7 -49.8 70 -99 SPO 1997 04 28 19 34 22 14.1 -9 668.40 -49.7 -49.7 -49.8 71 -99 SPO 1997 04 28 19 35 22 13.9 -9 668.40 -49.7 -49.6 -49.8 71 -99 SPO 1997 04 28 19 36 22 13.2 -9 668.40 -49.7 -49.6 -49.8 71 -99 SPO 1997 04 28 19 37 20 13.7 -9 668.40 -49.7 -49.6 -49.8 70 -99 SPO 1997 04 28 19 38 20 13.0 -9 668.40 -49.7 -49.6 -49.8 70 -99 SPO 1997 04 28 19 39 20 13.0 -9 668.40 -49.7 -49.6 -49.8 70 -99 SPO 1997 04 28 19 40 20 12.9 -9 668.50 -49.7 -49.6 -49.8 70 -99 SPO 1997 04 28 19 41 21 13.4 -9 668.50 -49.7 -49.6 -49.7 71 -99 SPO 1997 04 28 19 42 21 12.9 -9 668.50 -49.6 -49.6 -49.7 70 -99 SPO 1997 04 28 19 43 21 13.3 -9 668.40 -49.5 -49.5 -49.7 70 -99 SPO 1997 04 28 19 44 21 13.2 -9 668.50 -49.6 -49.5 -49.7 72 -99 SPO 1997 04 28 19 45 21 13.1 -9 668.50 -49.6 -49.4 -49.7 72 -99 SPO 1997 04 28 19 46 21 13.7 -9 668.50 -49.5 -49.4 -49.7 71 -99 SPO 1997 04 28 19 47 21 13.6 -9 668.50 -49.5 -49.4 -49.6 71 -99 SPO 1997 04 28 19 48 21 14.0 -9 668.60 -49.5 -49.4 -49.6 71 -99 SPO 1997 04 28 19 49 21 13.8 -9 668.50 -49.4 -49.4 -49.6 70 -99 SPO 1997 04 28 19 50 21 13.2 -9 668.50 -49.5 -49.4 -49.5 73 -99 SPO 1997 04 28 19 51 21 12.6 -9 668.50 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 28 19 52 20 12.3 -9 668.50 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 28 19 53 20 13.6 -9 668.50 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 28 19 54 19 13.8 -9 668.50 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 28 19 55 18 13.4 -9 668.60 -49.4 -49.4 -49.5 73 -99 SPO 1997 04 28 19 56 18 12.7 -9 668.70 -49.4 -49.4 -49.5 73 -99 SPO 1997 04 28 19 57 17 13.5 -9 668.70 -49.4 -49.4 -49.5 74 -99 SPO 1997 04 28 19 58 15 13.3 -9 668.70 -49.4 -49.4 -49.5 75 -99 SPO 1997 04 28 19 59 15 12.1 -9 668.70 -49.4 -49.4 -49.5 75 -99 SPO 1997 04 28 20 00 15 12.7 -9 668.80 -49.4 -49.4 -49.5 74 0 SPO 1997 04 28 20 01 17 12.6 -9 668.80 -49.3 -49.4 -49.5 73 -99 SPO 1997 04 28 20 02 17 12.3 -9 668.70 -49.3 -49.4 -49.6 73 -99 SPO 1997 04 28 20 03 15 12.1 -9 668.70 -49.4 -49.4 -49.5 75 -99 SPO 1997 04 28 20 04 17 12.2 -9 668.80 -49.4 -49.4 -49.6 76 -99 SPO 1997 04 28 20 05 15 13.1 -9 668.80 -49.4 -49.4 -49.5 76 -99 SPO 1997 04 28 20 06 15 12.9 -9 668.80 -49.4 -49.3 -49.5 77 -99 SPO 1997 04 28 20 07 15 12.4 -9 668.80 -49.4 -49.4 -49.5 78 -99 SPO 1997 04 28 20 08 15 12.2 -9 668.80 -49.4 -49.5 -49.6 78 -99 SPO 1997 04 28 20 09 16 12.6 -9 668.80 -49.4 -49.5 -49.6 79 -99 SPO 1997 04 28 20 10 16 12.1 -9 668.80 -49.4 -49.5 -49.6 79 -99 SPO 1997 04 28 20 11 16 12.1 -9 668.80 -49.5 -49.5 -49.6 80 -99 SPO 1997 04 28 20 12 17 12.8 -9 668.80 -49.5 -49.5 -49.6 80 -99 SPO 1997 04 28 20 13 16 12.7 -9 668.80 -49.5 -49.5 -49.6 80 -99 SPO 1997 04 28 20 14 17 13.1 -9 668.80 -49.5 -49.5 -49.6 80 -99 SPO 1997 04 28 20 15 17 12.8 -9 668.80 -49.5 -49.5 -49.6 79 -99 SPO 1997 04 28 20 16 16 12.7 -9 668.80 -49.5 -49.5 -49.6 80 -99 SPO 1997 04 28 20 17 17 12.8 -9 668.80 -49.5 -49.5 -49.6 81 -99 SPO 1997 04 28 20 18 16 13.0 -9 668.80 -49.6 -49.5 -49.7 81 -99 SPO 1997 04 28 20 19 16 12.6 -9 668.80 -49.4 -49.5 -49.6 81 -99 SPO 1997 04 28 20 20 17 12.8 -9 668.80 -49.5 -49.4 -49.6 82 -99 SPO 1997 04 28 20 21 17 12.9 -9 668.80 -49.5 -49.4 -49.7 82 -99 SPO 1997 04 28 20 22 17 12.3 -9 668.90 -49.5 -49.4 -49.7 82 -99 SPO 1997 04 28 20 23 16 12.5 -9 668.80 -49.5 -49.5 -49.7 81 -99 SPO 1997 04 28 20 24 16 12.4 -9 668.90 -49.5 -49.5 -49.7 80 -99 SPO 1997 04 28 20 25 18 12.6 -9 668.80 -49.5 -49.5 -49.7 79 -99 SPO 1997 04 28 20 26 18 13.1 -9 668.80 -49.6 -49.6 -49.8 81 -99 SPO 1997 04 28 20 27 17 12.9 -9 668.90 -49.6 -49.6 -49.8 81 -99 SPO 1997 04 28 20 28 19 12.8 -9 668.80 -49.6 -49.6 -49.8 81 -99 SPO 1997 04 28 20 29 19 12.7 -9 668.80 -49.6 -49.6 -49.8 81 -99 SPO 1997 04 28 20 30 19 12.3 -9 668.90 -49.7 -49.7 -49.8 82 -99 SPO 1997 04 28 20 31 19 11.9 -9 668.90 -49.7 -49.7 -49.9 82 -99 SPO 1997 04 28 20 32 19 11.8 -9 668.90 -49.8 -49.7 -49.9 83 -99 SPO 1997 04 28 20 33 18 11.6 -9 668.90 -49.8 -49.7 -49.9 83 -99 SPO 1997 04 28 20 34 18 11.8 -9 669.00 -49.8 -49.8 -49.9 83 -99 SPO 1997 04 28 20 35 17 11.7 -9 669.00 -49.8 -49.7 -49.9 82 -99 SPO 1997 04 28 20 36 15 11.3 -9 669.10 -49.7 -49.8 -50.0 81 -99 SPO 1997 04 28 20 37 14 11.7 -9 669.10 -49.8 -49.7 -49.9 81 -99 SPO 1997 04 28 20 38 14 11.4 -9 669.10 -49.8 -49.7 -50.0 81 -99 SPO 1997 04 28 20 39 13 11.2 -9 669.10 -49.8 -49.7 -50.0 81 -99 SPO 1997 04 28 20 40 11 11.2 -9 669.20 -49.8 -49.8 -50.0 81 -99 SPO 1997 04 28 20 41 12 11.0 -9 669.20 -49.8 -49.8 -50.0 81 -99 SPO 1997 04 28 20 42 13 10.8 -9 669.20 -49.8 -49.8 -50.0 80 -99 SPO 1997 04 28 20 43 14 11.4 -9 669.20 -49.8 -49.8 -50.0 80 -99 SPO 1997 04 28 20 44 13 11.6 -9 669.20 -49.8 -49.9 -50.0 81 -99 SPO 1997 04 28 20 45 13 11.1 -9 669.10 -49.9 -49.9 -50.1 82 -99 SPO 1997 04 28 20 46 13 11.1 -9 669.10 -50.0 -49.9 -50.1 82 -99 SPO 1997 04 28 20 47 13 11.2 -9 669.20 -50.0 -49.9 -50.1 81 -99 SPO 1997 04 28 20 48 13 11.1 -9 669.20 -50.0 -49.9 -50.1 81 -99 SPO 1997 04 28 20 49 13 10.8 -9 669.20 -50.0 -49.9 -50.2 80 -99 SPO 1997 04 28 20 50 12 10.2 -9 669.20 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 51 11 10.5 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 52 12 10.5 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 53 11 10.5 -9 669.30 -50.0 -50.0 -50.2 80 -99 SPO 1997 04 28 20 54 11 10.5 -9 669.30 -50.0 -50.0 -50.2 80 -99 SPO 1997 04 28 20 55 12 11.2 -9 669.20 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 56 12 10.5 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 57 11 10.7 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 58 10 10.5 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 20 59 10 10.9 -9 669.30 -50.1 -50.0 -50.2 80 -99 SPO 1997 04 28 21 00 10 10.8 -9 669.30 -50.1 -50.0 -50.2 80 0 SPO 1997 04 28 21 01 9 10.1 -9 669.30 -50.1 -50.0 -50.3 79 -99 SPO 1997 04 28 21 02 10 10.6 -9 669.30 -50.2 -50.1 -50.4 79 -99 SPO 1997 04 28 21 03 10 11.1 -9 669.30 -50.2 -50.1 -50.3 80 -99 SPO 1997 04 28 21 04 12 11.2 -9 669.30 -50.2 -50.1 -50.3 81 -99 SPO 1997 04 28 21 05 14 11.1 -9 669.30 -50.2 -50.1 -50.3 81 -99 SPO 1997 04 28 21 06 14 11.3 -9 669.20 -50.2 -50.1 -50.3 81 -99 SPO 1997 04 28 21 07 12 11.1 -9 669.30 -50.2 -50.2 -50.4 81 -99 SPO 1997 04 28 21 08 12 10.9 -9 669.30 -50.3 -50.2 -50.4 82 -99 SPO 1997 04 28 21 09 14 10.8 -9 669.30 -50.3 -50.2 -50.4 80 -99 SPO 1997 04 28 21 10 14 11.2 -9 669.30 -50.2 -50.2 -50.4 79 -99 SPO 1997 04 28 21 11 14 10.9 -9 669.30 -50.2 -50.2 -50.4 77 -99 SPO 1997 04 28 21 12 12 10.5 -9 669.30 -50.3 -50.2 -50.5 77 -99 SPO 1997 04 28 21 13 11 10.2 -9 669.40 -50.3 -50.2 -50.5 77 -99 SPO 1997 04 28 21 14 11 10.4 -9 669.40 -50.4 -50.2 -50.5 77 -99 SPO 1997 04 28 21 15 12 10.2 -9 669.40 -50.4 -50.2 -50.5 77 -99 SPO 1997 04 28 21 16 12 10.4 -9 669.40 -50.4 -50.2 -50.5 77 -99 SPO 1997 04 28 21 17 14 10.2 -9 669.40 -50.4 -50.2 -50.5 77 -99 SPO 1997 04 28 21 18 14 9.8 -9 669.40 -50.4 -50.3 -50.6 77 -99 SPO 1997 04 28 21 19 14 10.2 -9 669.40 -50.5 -50.3 -50.6 77 -99 SPO 1997 04 28 21 20 15 9.9 -9 669.40 -50.5 -50.4 -50.6 78 -99 SPO 1997 04 28 21 21 13 9.8 -9 669.40 -50.5 -50.4 -50.6 77 -99 SPO 1997 04 28 21 22 13 9.8 -9 669.40 -50.5 -50.4 -50.7 76 -99 SPO 1997 04 28 21 23 13 9.8 -9 669.40 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 21 24 14 9.4 -9 669.40 -50.6 -50.5 -50.7 76 -99 SPO 1997 04 28 21 25 12 9.3 -9 669.50 -50.6 -50.5 -50.7 75 -99 SPO 1997 04 28 21 26 12 9.1 -9 669.50 -50.6 -50.5 -50.8 75 -99 SPO 1997 04 28 21 27 12 9.4 -9 669.50 -50.6 -50.5 -50.7 75 -99 SPO 1997 04 28 21 28 14 8.9 -9 669.50 -50.6 -50.5 -50.8 75 -99 SPO 1997 04 28 21 29 14 9.5 -9 669.50 -50.7 -50.5 -50.8 76 -99 SPO 1997 04 28 21 30 12 8.9 -9 669.50 -50.7 -50.5 -50.8 76 -99 SPO 1997 04 28 21 31 11 9.6 -9 669.60 -50.7 -50.5 -50.8 77 -99 SPO 1997 04 28 21 32 12 9.0 -9 669.60 -50.7 -50.5 -50.8 77 -99 SPO 1997 04 28 21 33 10 8.6 -9 669.60 -50.7 -50.5 -50.8 76 -99 SPO 1997 04 28 21 34 11 8.5 -9 669.60 -50.8 -50.5 -50.9 76 -99 SPO 1997 04 28 21 35 10 8.8 -9 669.60 -50.8 -50.5 -50.9 76 -99 SPO 1997 04 28 21 36 9 8.4 -9 669.70 -50.8 -50.6 -50.9 75 -99 SPO 1997 04 28 21 37 9 8.8 -9 669.70 -50.8 -50.6 -50.9 74 -99 SPO 1997 04 28 21 38 9 8.4 -9 669.70 -50.8 -50.6 -50.9 75 -99 SPO 1997 04 28 21 39 9 8.4 -9 669.70 -50.8 -50.7 -51.0 76 -99 SPO 1997 04 28 21 40 8 7.8 -9 669.70 -50.8 -50.7 -50.9 76 -99 SPO 1997 04 28 21 41 7 8.2 -9 669.70 -50.8 -50.7 -51.0 76 -99 SPO 1997 04 28 21 42 7 7.9 -9 669.80 -50.8 -50.7 -51.0 76 -99 SPO 1997 04 28 21 43 7 7.6 -9 669.80 -50.9 -50.8 -51.0 76 -99 SPO 1997 04 28 21 44 6 7.0 -9 669.90 -51.0 -50.8 -51.1 76 -99 SPO 1997 04 28 21 45 4 6.8 -9 670.00 -51.0 -50.8 -51.1 75 -99 SPO 1997 04 28 21 46 4 6.7 -9 670.00 -51.0 -50.8 -51.1 74 -99 SPO 1997 04 28 21 47 7 6.4 -9 670.00 -51.0 -50.8 -51.1 73 -99 SPO 1997 04 28 21 48 8 6.5 -9 670.00 -51.0 -50.8 -51.1 73 -99 SPO 1997 04 28 21 49 9 6.9 -9 670.00 -51.0 -50.8 -51.1 74 -99 SPO 1997 04 28 21 50 10 6.9 -9 670.00 -51.0 -50.8 -51.1 75 -99 SPO 1997 04 28 21 51 11 6.8 -9 669.90 -51.0 -50.8 -51.1 75 -99 SPO 1997 04 28 21 52 11 7.0 -9 669.90 -51.0 -50.8 -51.1 75 -99 SPO 1997 04 28 21 53 12 6.9 -9 669.90 -51.0 -50.8 -51.1 75 -99 SPO 1997 04 28 21 54 12 6.6 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 21 55 11 7.4 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 21 56 11 7.1 -9 669.90 -51.0 -51.0 -51.1 74 -99 SPO 1997 04 28 21 57 11 7.3 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 21 58 11 7.3 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 21 59 10 7.4 -9 669.90 -51.0 -51.0 -51.1 73 -99 SPO 1997 04 28 22 00 9 7.3 -9 669.90 -51.0 -51.0 -51.1 73 0 SPO 1997 04 28 22 01 10 7.5 -9 669.90 -51.0 -50.9 -51.1 73 -99 SPO 1997 04 28 22 02 10 8.0 -9 669.90 -51.0 -50.9 -51.0 73 -99 SPO 1997 04 28 22 03 11 7.7 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 04 12 8.0 -9 669.80 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 05 14 8.1 -9 669.80 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 06 13 8.3 -9 669.80 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 07 13 8.1 -9 669.80 -51.0 -50.9 -51.1 75 -99 SPO 1997 04 28 22 08 11 7.7 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 09 11 8.0 -9 669.90 -51.0 -50.9 -51.0 73 -99 SPO 1997 04 28 22 10 11 7.5 -9 670.00 -51.0 -50.9 -51.0 72 -99 SPO 1997 04 28 22 11 11 7.6 -9 670.00 -51.0 -50.8 -51.0 72 -99 SPO 1997 04 28 22 12 10 7.5 -9 670.00 -51.0 -50.9 -51.1 72 -99 SPO 1997 04 28 22 13 10 7.5 -9 670.00 -51.0 -51.0 -51.1 73 -99 SPO 1997 04 28 22 14 10 7.5 -9 670.00 -51.0 -51.0 -51.1 73 -99 SPO 1997 04 28 22 15 12 7.7 -9 669.90 -50.9 -51.0 -51.1 72 -99 SPO 1997 04 28 22 16 13 8.0 -9 669.90 -50.9 -51.0 -51.1 72 -99 SPO 1997 04 28 22 17 14 8.4 -9 669.90 -50.9 -51.0 -51.1 72 -99 SPO 1997 04 28 22 18 13 8.2 -9 669.90 -51.0 -51.0 -51.1 74 -99 SPO 1997 04 28 22 19 12 8.4 -9 669.90 -51.0 -50.9 -51.1 74 -99 SPO 1997 04 28 22 20 14 8.7 -9 669.90 -51.0 -50.9 -51.1 73 -99 SPO 1997 04 28 22 21 13 8.0 -9 669.90 -51.0 -51.0 -51.1 73 -99 SPO 1997 04 28 22 22 14 8.1 -9 670.00 -51.1 -51.0 -51.2 73 -99 SPO 1997 04 28 22 23 13 8.2 -9 669.90 -51.1 -51.0 -51.2 72 -99 SPO 1997 04 28 22 24 13 8.0 -9 669.90 -51.1 -51.0 -51.2 72 -99 SPO 1997 04 28 22 25 13 7.8 -9 669.90 -51.1 -50.9 -51.2 72 -99 SPO 1997 04 28 22 26 14 8.2 -9 669.90 -51.1 -50.9 -51.2 72 -99 SPO 1997 04 28 22 27 14 8.2 -9 669.90 -51.1 -50.9 -51.2 73 -99 SPO 1997 04 28 22 28 13 8.3 -9 669.90 -51.1 -50.9 -51.1 73 -99 SPO 1997 04 28 22 29 15 8.3 -9 669.90 -51.0 -50.9 -51.1 72 -99 SPO 1997 04 28 22 30 16 8.6 -9 669.80 -51.1 -50.9 -51.2 73 -99 SPO 1997 04 28 22 31 16 9.0 -9 669.80 -51.1 -51.0 -51.1 73 -99 SPO 1997 04 28 22 32 16 8.6 -9 669.80 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 28 22 33 15 9.0 -9 669.70 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 28 22 34 15 9.0 -9 669.70 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 28 22 35 15 8.9 -9 669.70 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 28 22 36 17 9.0 -9 669.70 -51.0 -50.9 -51.1 71 -99 SPO 1997 04 28 22 37 16 9.2 -9 669.70 -51.0 -50.9 -51.1 72 -99 SPO 1997 04 28 22 38 13 9.3 -9 669.80 -51.0 -50.9 -51.2 72 -99 SPO 1997 04 28 22 39 13 9.3 -9 669.80 -51.0 -50.9 -51.1 73 -99 SPO 1997 04 28 22 40 13 9.0 -9 669.80 -51.0 -50.9 -51.1 73 -99 SPO 1997 04 28 22 41 14 9.3 -9 669.70 -51.0 -50.9 -51.1 73 -99 SPO 1997 04 28 22 42 15 9.8 -9 669.70 -51.0 -50.8 -51.1 74 -99 SPO 1997 04 28 22 43 16 10.2 -9 669.70 -51.0 -50.8 -51.1 73 -99 SPO 1997 04 28 22 44 15 9.7 -9 669.70 -51.0 -50.8 -51.1 73 -99 SPO 1997 04 28 22 45 15 10.2 -9 669.70 -51.0 -50.8 -51.0 72 -99 SPO 1997 04 28 22 46 14 9.7 -9 669.70 -51.0 -50.8 -51.1 71 -99 SPO 1997 04 28 22 47 13 10.2 -9 669.70 -51.0 -50.8 -51.0 71 -99 SPO 1997 04 28 22 48 12 9.6 -9 669.70 -51.0 -50.9 -51.0 72 -99 SPO 1997 04 28 22 49 11 9.8 -9 669.70 -50.9 -50.9 -51.1 72 -99 SPO 1997 04 28 22 50 11 9.9 -9 669.70 -50.9 -50.9 -51.0 73 -99 SPO 1997 04 28 22 51 13 10.2 -9 669.70 -50.8 -50.8 -51.0 72 -99 SPO 1997 04 28 22 52 13 10.3 -9 669.60 -50.8 -50.8 -51.0 73 -99 SPO 1997 04 28 22 53 14 10.5 -9 669.60 -50.8 -50.8 -50.9 73 -99 SPO 1997 04 28 22 54 14 10.2 -9 669.60 -50.8 -50.7 -50.9 73 -99 SPO 1997 04 28 22 55 14 10.3 -9 669.60 -50.9 -50.7 -51.0 74 -99 SPO 1997 04 28 22 56 14 10.7 -9 669.60 -50.8 -50.7 -50.9 73 -99 SPO 1997 04 28 22 57 15 10.3 -9 669.60 -50.8 -50.7 -50.9 74 -99 SPO 1997 04 28 22 58 14 10.6 -9 669.60 -50.8 -50.7 -50.9 73 -99 SPO 1997 04 28 22 59 14 10.6 -9 669.70 -50.8 -50.6 -50.9 73 -99 SPO 1997 04 28 23 00 13 10.3 -9 669.70 -50.8 -50.6 -50.9 75 0 SPO 1997 04 28 23 01 13 10.1 -9 669.70 -50.8 -50.6 -50.9 76 -99 SPO 1997 04 28 23 02 13 10.6 -9 669.70 -50.8 -50.6 -50.9 76 -99 SPO 1997 04 28 23 03 12 10.5 -9 669.70 -50.8 -50.6 -50.9 75 -99 SPO 1997 04 28 23 04 13 10.4 -9 669.80 -50.8 -50.6 -50.9 75 -99 SPO 1997 04 28 23 05 12 9.9 -9 669.80 -50.8 -50.7 -50.9 76 -99 SPO 1997 04 28 23 06 12 9.9 -9 669.80 -50.8 -50.7 -50.9 76 -99 SPO 1997 04 28 23 07 10 9.4 -9 669.80 -50.7 -50.7 -50.9 74 -99 SPO 1997 04 28 23 08 11 9.8 -9 669.80 -50.7 -50.7 -50.8 74 -99 SPO 1997 04 28 23 09 10 10.1 -9 669.80 -50.7 -50.6 -50.8 74 -99 SPO 1997 04 28 23 10 10 9.8 -9 669.80 -50.7 -50.6 -50.8 75 -99 SPO 1997 04 28 23 11 10 9.8 -9 669.90 -50.6 -50.6 -50.8 75 -99 SPO 1997 04 28 23 12 9 9.5 -9 669.90 -50.7 -50.6 -50.7 76 -99 SPO 1997 04 28 23 13 10 9.8 -9 669.90 -50.6 -50.6 -50.8 76 -99 SPO 1997 04 28 23 14 8 9.7 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 15 9 9.5 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 16 7 8.9 -9 670.00 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 17 8 8.9 -9 669.90 -50.6 -50.5 -50.7 78 -99 SPO 1997 04 28 23 18 8 9.8 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 19 9 9.8 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 20 10 9.5 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 21 10 10.1 -9 669.90 -50.6 -50.5 -50.7 75 -99 SPO 1997 04 28 23 22 10 9.8 -9 669.90 -50.6 -50.5 -50.7 75 -99 SPO 1997 04 28 23 23 9 9.8 -9 669.90 -50.6 -50.6 -50.7 76 -99 SPO 1997 04 28 23 24 9 10.3 -9 669.90 -50.5 -50.6 -50.7 76 -99 SPO 1997 04 28 23 25 9 10.2 -9 669.90 -50.6 -50.6 -50.6 77 -99 SPO 1997 04 28 23 26 10 10.4 -9 669.80 -50.6 -50.6 -50.6 77 -99 SPO 1997 04 28 23 27 11 10.4 -9 669.80 -50.6 -50.6 -50.7 77 -99 SPO 1997 04 28 23 28 13 10.7 -9 669.80 -50.6 -50.5 -50.6 78 -99 SPO 1997 04 28 23 29 12 11.0 -9 669.80 -50.5 -50.5 -50.7 77 -99 SPO 1997 04 28 23 30 11 10.8 -9 669.80 -50.5 -50.5 -50.6 76 -99 SPO 1997 04 28 23 31 11 10.4 -9 669.80 -50.5 -50.5 -50.7 76 -99 SPO 1997 04 28 23 32 13 10.3 -9 669.80 -50.6 -50.5 -50.7 76 -99 SPO 1997 04 28 23 33 11 10.4 -9 669.80 -50.6 -50.5 -50.7 75 -99 SPO 1997 04 28 23 34 12 10.6 -9 669.90 -50.5 -50.5 -50.7 75 -99 SPO 1997 04 28 23 35 12 10.0 -9 669.90 -50.6 -50.5 -50.7 76 -99 SPO 1997 04 28 23 36 11 10.4 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 37 11 10.1 -9 669.90 -50.6 -50.5 -50.7 77 -99 SPO 1997 04 28 23 38 11 9.9 -9 669.90 -50.6 -50.5 -50.8 77 -99 SPO 1997 04 28 23 39 11 10.0 -9 669.90 -50.6 -50.5 -50.8 77 -99 SPO 1997 04 28 23 40 12 10.2 -9 669.90 -50.6 -50.6 -50.8 77 -99 SPO 1997 04 28 23 41 12 10.4 -9 669.90 -50.7 -50.6 -50.8 76 -99 SPO 1997 04 28 23 42 12 10.4 -9 669.90 -50.6 -50.6 -50.8 75 -99 SPO 1997 04 28 23 43 13 10.5 -9 669.90 -50.7 -50.7 -50.8 74 -99 SPO 1997 04 28 23 44 14 10.2 -9 669.90 -50.8 -50.7 -50.9 75 -99 SPO 1997 04 28 23 45 13 10.4 -9 669.90 -50.8 -50.7 -50.9 74 -99 SPO 1997 04 28 23 46 13 10.4 -9 669.90 -50.7 -50.6 -50.8 73 -99 SPO 1997 04 28 23 47 14 10.3 -9 670.00 -50.7 -50.7 -50.8 74 -99 SPO 1997 04 28 23 48 13 9.9 -9 670.00 -50.8 -50.6 -50.9 76 -99 SPO 1997 04 28 23 49 14 10.4 -9 670.00 -50.8 -50.6 -50.9 77 -99 SPO 1997 04 28 23 50 14 10.3 -9 670.00 -50.8 -50.6 -50.9 76 -99 SPO 1997 04 28 23 51 12 10.5 -9 670.00 -50.8 -50.6 -50.9 76 -99 SPO 1997 04 28 23 52 13 10.4 -9 670.00 -50.7 -50.6 -50.9 75 -99 SPO 1997 04 28 23 53 14 10.6 -9 669.90 -50.7 -50.5 -50.8 74 -99 SPO 1997 04 28 23 54 14 10.8 -9 669.90 -50.7 -50.5 -50.8 74 -99 SPO 1997 04 28 23 55 15 11.3 -9 669.80 -50.7 -50.5 -50.8 73 -99 SPO 1997 04 28 23 56 15 11.1 -9 669.80 -50.7 -50.4 -50.8 73 -99 SPO 1997 04 28 23 57 14 11.3 -9 669.80 -50.7 -50.4 -50.8 73 -99 SPO 1997 04 28 23 58 14 11.2 -9 669.80 -50.7 -50.5 -50.7 -99 -99 SPO 1997 04 28 23 59 14 11.2 -9 669.80 -50.6 -50.5 -50.7 -99 -99 SPO 1997 04 29 00 00 13 11.2 -9 669.80 -50.6 -50.5 -50.7 -99 0 SPO 1997 04 29 00 01 15 10.8 -9 669.80 -50.7 -50.5 -50.7 -99 -99 SPO 1997 04 29 00 02 14 10.8 -9 669.80 -50.7 -50.5 -50.7 -99 -99 SPO 1997 04 29 00 03 15 10.9 -9 669.80 -50.7 -50.5 -50.7 -99 -99 SPO 1997 04 29 00 04 15 10.9 -9 669.80 -50.6 -50.4 -50.7 -99 -99 SPO 1997 04 29 00 05 16 11.1 -9 669.80 -50.6 -50.4 -50.7 -99 -99 SPO 1997 04 29 00 06 15 10.9 -9 669.80 -50.6 -50.4 -50.7 -99 -99 SPO 1997 04 29 00 07 15 11.0 -9 669.80 -50.6 -50.3 -50.7 -99 -99 SPO 1997 04 29 00 08 15 11.0 -9 669.80 -50.6 -50.3 -50.7 -99 -99 SPO 1997 04 29 00 09 15 11.1 -9 669.80 -50.6 -50.3 -50.6 -99 -99 SPO 1997 04 29 00 10 14 10.9 -9 669.90 -50.5 -50.3 -50.6 -99 -99 SPO 1997 04 29 00 11 14 10.9 -9 669.90 -50.5 -50.3 -50.6 -99 -99 SPO 1997 04 29 00 12 13 10.9 -9 669.90 -50.5 -50.2 -50.6 -99 -99 SPO 1997 04 29 00 13 14 10.6 -9 669.90 -50.5 -50.2 -50.6 74 -99 SPO 1997 04 29 00 14 14 10.7 -9 669.90 -50.5 -50.2 -50.6 74 -99 SPO 1997 04 29 00 15 14 10.4 -9 670.00 -50.5 -50.2 -50.6 73 -99 SPO 1997 04 29 00 16 14 10.6 -9 669.90 -50.5 -50.3 -50.6 73 -99 SPO 1997 04 29 00 17 14 10.7 -9 669.90 -50.4 -50.3 -50.6 72 -99 SPO 1997 04 29 00 18 14 10.6 -9 669.90 -50.4 -50.3 -50.6 72 -99 SPO 1997 04 29 00 19 15 10.5 -9 669.90 -50.5 -50.3 -50.6 72 -99 SPO 1997 04 29 00 20 16 10.5 -9 670.00 -50.5 -50.3 -50.6 72 -99 SPO 1997 04 29 00 21 15 10.3 -9 670.00 -50.5 -50.3 -50.6 73 -99 SPO 1997 04 29 00 22 15 10.3 -9 670.00 -50.5 -50.3 -50.6 74 -99 SPO 1997 04 29 00 23 14 9.8 -9 670.10 -50.4 -50.3 -50.5 74 -99 SPO 1997 04 29 00 24 15 9.5 -9 670.10 -50.4 -50.3 -50.6 75 -99 SPO 1997 04 29 00 25 14 9.4 -9 670.10 -50.4 -50.2 -50.6 75 -99 SPO 1997 04 29 00 26 14 9.5 -9 670.20 -50.4 -50.2 -50.6 76 -99 SPO 1997 04 29 00 27 14 9.3 -9 670.20 -50.4 -50.2 -50.5 76 -99 SPO 1997 04 29 00 28 13 9.2 -9 670.20 -50.4 -50.2 -50.5 76 -99 SPO 1997 04 29 00 29 14 9.0 -9 670.20 -50.4 -50.2 -50.5 75 -99 SPO 1997 04 29 00 30 14 9.3 -9 670.20 -50.4 -50.2 -50.5 75 -99 SPO 1997 04 29 00 31 14 9.4 -9 670.30 -50.4 -50.2 -50.4 75 -99 SPO 1997 04 29 00 32 13 9.0 -9 670.30 -50.4 -50.2 -50.5 75 -99 SPO 1997 04 29 00 33 12 8.8 -9 670.30 -50.4 -50.2 -50.5 75 -99 SPO 1997 04 29 00 34 11 8.6 -9 670.40 -50.4 -50.2 -50.4 75 -99 SPO 1997 04 29 00 35 11 8.4 -9 670.40 -50.3 -50.3 -50.4 75 -99 SPO 1997 04 29 00 36 11 8.4 -9 670.40 -50.4 -50.3 -50.4 76 -99 SPO 1997 04 29 00 37 10 8.1 -9 670.40 -50.4 -50.3 -50.5 76 -99 SPO 1997 04 29 00 38 11 8.2 -9 670.40 -50.4 -50.3 -50.4 77 -99 SPO 1997 04 29 00 39 11 8.1 -9 670.40 -50.4 -50.3 -50.4 77 -99 SPO 1997 04 29 00 40 11 8.2 -9 670.40 -50.4 -50.3 -50.4 76 -99 SPO 1997 04 29 00 41 11 8.4 -9 670.40 -50.4 -50.3 -50.4 76 -99 SPO 1997 04 29 00 42 12 8.8 -9 670.40 -50.2 -50.2 -50.4 73 -99 SPO 1997 04 29 00 43 12 8.6 -9 670.40 -50.3 -50.2 -50.4 74 -99 SPO 1997 04 29 00 44 12 8.6 -9 670.40 -50.3 -50.1 -50.4 74 -99 SPO 1997 04 29 00 45 13 8.8 -9 670.40 -50.3 -50.1 -50.4 75 -99 SPO 1997 04 29 00 46 13 8.8 -9 670.40 -50.3 -50.1 -50.4 75 -99 SPO 1997 04 29 00 47 13 8.9 -9 670.30 -50.3 -50.1 -50.4 75 -99 SPO 1997 04 29 00 48 13 8.8 -9 670.30 -50.3 -50.1 -50.4 76 -99 SPO 1997 04 29 00 49 13 9.0 -9 670.30 -50.3 -50.1 -50.4 76 -99 SPO 1997 04 29 00 50 15 9.3 -9 670.30 -50.3 -50.1 -50.4 76 -99 SPO 1997 04 29 00 51 16 9.0 -9 670.30 -50.2 -50.1 -50.3 74 -99 SPO 1997 04 29 00 52 15 9.0 -9 670.30 -50.2 -50.2 -50.3 73 -99 SPO 1997 04 29 00 53 15 9.2 -9 670.30 -50.2 -50.2 -50.3 73 -99 SPO 1997 04 29 00 54 15 9.1 -9 670.40 -50.3 -50.2 -50.3 74 -99 SPO 1997 04 29 00 55 15 8.3 -9 670.30 -50.2 -50.2 -50.3 73 -99 SPO 1997 04 29 00 56 15 8.6 -9 670.40 -50.3 -50.2 -50.4 75 -99 SPO 1997 04 29 00 57 16 9.2 -9 670.30 -50.3 -50.2 -50.3 75 -99 SPO 1997 04 29 00 58 16 8.8 -9 670.40 -50.3 -50.2 -50.3 74 -99 SPO 1997 04 29 00 59 16 8.8 -9 670.40 -50.3 -50.2 -50.4 74 -99 SPO 1997 04 29 01 00 16 8.7 -9 670.40 -50.2 -50.2 -50.4 73 0 SPO 1997 04 29 01 01 16 8.7 -9 670.40 -50.2 -50.2 -50.4 73 -99 SPO 1997 04 29 01 02 17 8.8 -9 670.40 -50.2 -50.1 -50.3 73 -99 SPO 1997 04 29 01 03 16 9.0 -9 670.40 -50.2 -50.1 -50.3 73 -99 SPO 1997 04 29 01 04 16 8.9 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 05 16 9.1 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 06 16 9.2 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 07 16 8.8 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 08 15 8.4 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 09 15 8.5 -9 670.30 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 10 14 8.3 -9 670.30 -50.2 -50.2 -50.3 72 -99 SPO 1997 04 29 01 11 13 7.9 -9 670.30 -50.2 -50.2 -50.3 73 -99 SPO 1997 04 29 01 12 12 7.7 -9 670.40 -50.2 -50.2 -50.3 73 -99 SPO 1997 04 29 01 13 13 7.8 -9 670.40 -50.3 -50.2 -50.3 74 -99 SPO 1997 04 29 01 14 13 7.6 -9 670.40 -50.2 -50.2 -50.2 73 -99 SPO 1997 04 29 01 15 12 7.3 -9 670.40 -50.3 -50.2 -50.3 73 -99 SPO 1997 04 29 01 16 11 7.2 -9 670.40 -50.3 -50.2 -50.3 73 -99 SPO 1997 04 29 01 17 11 7.6 -9 670.40 -50.2 -50.2 -50.3 72 -99 SPO 1997 04 29 01 18 10 8.3 -9 670.40 -50.2 -50.2 -50.3 72 -99 SPO 1997 04 29 01 19 11 7.4 -9 670.40 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 01 20 11 8.0 -9 670.40 -50.2 -50.1 -50.2 72 -99 SPO 1997 04 29 01 21 11 7.8 -9 670.40 -50.1 -50.1 -50.2 72 -99 SPO 1997 04 29 01 22 11 7.6 -9 670.50 -50.1 -50.1 -50.2 73 -99 SPO 1997 04 29 01 23 11 7.7 -9 670.40 -50.1 -50.0 -50.3 74 -99 SPO 1997 04 29 01 24 11 7.6 -9 670.40 -50.1 -50.0 -50.2 74 -99 SPO 1997 04 29 01 25 11 8.2 -9 670.40 -50.1 -50.0 -50.2 75 -99 SPO 1997 04 29 01 26 11 8.3 -9 670.40 -50.1 -50.0 -50.2 74 -99 SPO 1997 04 29 01 27 11 8.2 -9 670.40 -50.1 -50.0 -50.2 74 -99 SPO 1997 04 29 01 28 12 8.7 -9 670.40 -50.0 -50.0 -50.1 72 -99 SPO 1997 04 29 01 29 12 9.6 -9 670.30 -50.1 -50.0 -50.1 73 -99 SPO 1997 04 29 01 30 13 8.9 -9 670.30 -50.0 -50.0 -50.1 72 -99 SPO 1997 04 29 01 31 13 9.3 -9 670.30 -50.0 -50.0 -50.1 71 -99 SPO 1997 04 29 01 32 12 9.3 -9 670.30 -50.0 -49.9 -50.0 72 -99 SPO 1997 04 29 01 33 11 9.4 -9 670.20 -50.0 -50.0 -50.0 72 -99 SPO 1997 04 29 01 34 12 9.4 -9 670.30 -50.0 -49.9 -50.0 72 -99 SPO 1997 04 29 01 35 12 9.5 -9 670.30 -50.0 -49.9 -50.0 72 -99 SPO 1997 04 29 01 36 12 10.2 -9 670.20 -49.8 -49.8 -49.9 72 -99 SPO 1997 04 29 01 37 12 9.4 -9 670.30 -49.8 -49.8 -49.9 73 -99 SPO 1997 04 29 01 38 11 9.4 -9 670.20 -49.8 -49.7 -50.0 73 -99 SPO 1997 04 29 01 39 11 10.1 -9 670.20 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 29 01 40 11 10.0 -9 670.20 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 29 01 41 12 9.7 -9 670.20 -49.8 -49.7 -49.8 73 -99 SPO 1997 04 29 01 42 12 9.8 -9 670.20 -49.7 -49.6 -49.8 72 -99 SPO 1997 04 29 01 43 11 9.7 -9 670.20 -49.7 -49.6 -49.8 71 -99 SPO 1997 04 29 01 44 12 9.6 -9 670.20 -49.7 -49.6 -49.8 71 -99 SPO 1997 04 29 01 45 11 9.4 -9 670.20 -49.6 -49.7 -49.8 70 -99 SPO 1997 04 29 01 46 11 9.5 -9 670.30 -49.7 -49.7 -49.8 71 -99 SPO 1997 04 29 01 47 11 9.3 -9 670.30 -49.7 -49.7 -49.8 73 -99 SPO 1997 04 29 01 48 12 9.2 -9 670.40 -49.6 -49.7 -49.8 72 -99 SPO 1997 04 29 01 49 11 9.2 -9 670.40 -49.6 -49.7 -49.8 73 -99 SPO 1997 04 29 01 50 13 9.2 -9 670.40 -49.6 -49.7 -49.7 72 -99 SPO 1997 04 29 01 51 13 9.3 -9 670.40 -49.6 -49.6 -49.7 72 -99 SPO 1997 04 29 01 52 14 9.4 -9 670.40 -49.7 -49.6 -49.7 73 -99 SPO 1997 04 29 01 53 14 9.6 -9 670.40 -49.7 -49.6 -49.7 73 -99 SPO 1997 04 29 01 54 15 9.5 -9 670.40 -49.6 -49.6 -49.7 72 -99 SPO 1997 04 29 01 55 15 9.2 -9 670.40 -49.6 -49.6 -49.7 72 -99 SPO 1997 04 29 01 56 15 9.3 -9 670.40 -49.5 -49.6 -49.7 73 -99 SPO 1997 04 29 01 57 15 9.6 -9 670.40 -49.6 -49.5 -49.7 73 -99 SPO 1997 04 29 01 58 15 10.5 -9 670.40 -49.6 -49.4 -49.6 74 -99 SPO 1997 04 29 01 59 15 10.1 -9 670.30 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 00 15 10.6 -9 670.30 -49.6 -49.4 -49.7 74 0 SPO 1997 04 29 02 01 14 10.5 -9 670.30 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 02 13 9.5 -9 670.40 -49.5 -49.4 -49.6 71 -99 SPO 1997 04 29 02 03 13 9.7 -9 670.40 -49.5 -49.5 -49.7 71 -99 SPO 1997 04 29 02 04 13 9.8 -9 670.40 -49.6 -49.5 -49.6 72 -99 SPO 1997 04 29 02 05 12 10.0 -9 670.40 -49.6 -49.6 -49.7 72 -99 SPO 1997 04 29 02 06 13 10.3 -9 670.40 -49.5 -49.5 -49.6 71 -99 SPO 1997 04 29 02 07 12 10.2 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 08 12 10.3 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 09 11 10.2 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 10 12 10.1 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 11 11 10.0 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 12 12 10.2 -9 670.40 -49.6 -49.5 -49.6 74 -99 SPO 1997 04 29 02 13 12 9.7 -9 670.40 -49.6 -49.5 -49.7 75 -99 SPO 1997 04 29 02 14 11 10.2 -9 670.40 -49.5 -49.5 -49.6 73 -99 SPO 1997 04 29 02 15 12 9.7 -9 670.40 -49.4 -49.5 -49.6 73 -99 SPO 1997 04 29 02 16 11 9.5 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 17 11 9.9 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 18 10 10.1 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 19 10 9.9 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 20 10 9.9 -9 670.40 -49.5 -49.3 -49.6 73 -99 SPO 1997 04 29 02 21 11 9.6 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 22 10 9.7 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 23 11 9.8 -9 670.40 -49.5 -49.5 -49.6 74 -99 SPO 1997 04 29 02 24 10 9.6 -9 670.40 -49.5 -49.5 -49.6 75 -99 SPO 1997 04 29 02 25 11 9.6 -9 670.40 -49.5 -49.5 -49.6 75 -99 SPO 1997 04 29 02 26 12 9.5 -9 670.40 -49.5 -49.5 -49.6 75 -99 SPO 1997 04 29 02 27 10 10.0 -9 670.40 -49.5 -49.5 -49.6 74 -99 SPO 1997 04 29 02 28 10 9.9 -9 670.40 -49.5 -49.5 -49.6 74 -99 SPO 1997 04 29 02 29 10 9.7 -9 670.40 -49.5 -49.5 -49.7 73 -99 SPO 1997 04 29 02 30 10 9.9 -9 670.40 -49.6 -49.5 -49.6 74 -99 SPO 1997 04 29 02 31 9 10.2 -9 670.40 -49.6 -49.5 -49.7 75 -99 SPO 1997 04 29 02 32 8 10.1 -9 670.30 -49.6 -49.5 -49.6 76 -99 SPO 1997 04 29 02 33 8 10.0 -9 670.30 -49.5 -49.5 -49.7 75 -99 SPO 1997 04 29 02 34 8 9.8 -9 670.30 -49.5 -49.5 -49.7 75 -99 SPO 1997 04 29 02 35 7 10.2 -9 670.30 -49.6 -49.4 -49.7 76 -99 SPO 1997 04 29 02 36 7 10.1 -9 670.40 -49.6 -49.4 -49.7 77 -99 SPO 1997 04 29 02 37 7 10.2 -9 670.40 -49.6 -49.4 -49.7 76 -99 SPO 1997 04 29 02 38 7 9.8 -9 670.40 -49.6 -49.4 -49.7 76 -99 SPO 1997 04 29 02 39 7 10.2 -9 670.40 -49.6 -49.4 -49.7 74 -99 SPO 1997 04 29 02 40 8 9.6 -9 670.40 -49.6 -49.5 -49.7 74 -99 SPO 1997 04 29 02 41 7 9.9 -9 670.40 -49.6 -49.5 -49.7 74 -99 SPO 1997 04 29 02 42 8 10.8 -9 670.40 -49.6 -49.5 -49.6 74 -99 SPO 1997 04 29 02 43 6 10.3 -9 670.40 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 02 44 6 10.2 -9 670.40 -49.5 -49.4 -49.6 74 -99 SPO 1997 04 29 02 45 6 10.2 -9 670.40 -49.5 -49.4 -49.6 74 -99 SPO 1997 04 29 02 46 6 10.2 -9 670.40 -49.5 -49.4 -49.6 75 -99 SPO 1997 04 29 02 47 5 10.3 -9 670.40 -49.5 -49.4 -49.5 75 -99 SPO 1997 04 29 02 48 5 10.2 -9 670.40 -49.5 -49.4 -49.5 76 -99 SPO 1997 04 29 02 49 5 9.7 -9 670.40 -49.5 -49.3 -49.5 76 -99 SPO 1997 04 29 02 50 5 10.0 -9 670.40 -49.5 -49.3 -49.5 76 -99 SPO 1997 04 29 02 51 5 9.9 -9 670.40 -49.4 -49.3 -49.5 74 -99 SPO 1997 04 29 02 52 4 10.0 -9 670.40 -49.3 -49.3 -49.5 73 -99 SPO 1997 04 29 02 53 4 9.7 -9 670.40 -49.4 -49.3 -49.5 74 -99 SPO 1997 04 29 02 54 5 9.6 -9 670.40 -49.4 -49.2 -49.5 75 -99 SPO 1997 04 29 02 55 6 9.2 -9 670.40 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 02 56 4 8.7 -9 670.50 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 02 57 4 9.4 -9 670.50 -49.4 -49.2 -49.5 77 -99 SPO 1997 04 29 02 58 5 9.2 -9 670.50 -49.4 -49.3 -49.4 76 -99 SPO 1997 04 29 02 59 7 9.2 -9 670.50 -49.4 -49.3 -49.5 76 -99 SPO 1997 04 29 03 00 7 9.9 -9 670.50 -49.4 -49.3 -49.4 77 0 SPO 1997 04 29 03 01 7 10.2 -9 670.40 -49.3 -49.2 -49.4 75 -99 SPO 1997 04 29 03 02 8 9.8 -9 670.40 -49.3 -49.2 -49.4 75 -99 SPO 1997 04 29 03 03 8 9.8 -9 670.40 -49.3 -49.2 -49.4 75 -99 SPO 1997 04 29 03 04 9 10.0 -9 670.40 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 03 05 10 10.6 -9 670.40 -49.3 -49.2 -49.4 75 -99 SPO 1997 04 29 03 06 9 10.6 -9 670.40 -49.3 -49.1 -49.3 76 -99 SPO 1997 04 29 03 07 9 10.6 -9 670.30 -49.3 -49.1 -49.3 76 -99 SPO 1997 04 29 03 08 9 10.5 -9 670.40 -49.3 -49.1 -49.3 76 -99 SPO 1997 04 29 03 09 10 10.8 -9 670.30 -49.3 -49.0 -49.4 76 -99 SPO 1997 04 29 03 10 9 9.7 -9 670.40 -49.2 -49.0 -49.3 75 -99 SPO 1997 04 29 03 11 8 10.4 -9 670.40 -49.2 -49.0 -49.3 76 -99 SPO 1997 04 29 03 12 9 10.0 -9 670.40 -49.2 -49.0 -49.2 77 -99 SPO 1997 04 29 03 13 9 10.3 -9 670.40 -49.2 -49.0 -49.3 77 -99 SPO 1997 04 29 03 14 8 10.5 -9 670.40 -49.1 -49.0 -49.2 76 -99 SPO 1997 04 29 03 15 9 10.1 -9 670.40 -49.1 -49.0 -49.2 76 -99 SPO 1997 04 29 03 16 9 9.8 -9 670.40 -49.1 -49.0 -49.2 76 -99 SPO 1997 04 29 03 17 8 10.1 -9 670.40 -49.2 -49.0 -49.3 78 -99 SPO 1997 04 29 03 18 8 10.2 -9 670.40 -49.2 -49.1 -49.3 78 -99 SPO 1997 04 29 03 19 8 10.2 -9 670.40 -49.1 -49.1 -49.2 76 -99 SPO 1997 04 29 03 20 7 9.5 -9 670.40 -49.1 -49.1 -49.2 76 -99 SPO 1997 04 29 03 21 7 9.8 -9 670.50 -49.1 -49.1 -49.2 75 -99 SPO 1997 04 29 03 22 8 9.4 -9 670.40 -49.1 -49.1 -49.3 75 -99 SPO 1997 04 29 03 23 7 9.9 -9 670.40 -49.2 -49.1 -49.2 76 -99 SPO 1997 04 29 03 24 7 9.3 -9 670.40 -49.2 -49.1 -49.2 76 -99 SPO 1997 04 29 03 25 9 10.4 -9 670.40 -49.2 -49.0 -49.2 76 -99 SPO 1997 04 29 03 26 8 10.3 -9 670.30 -49.2 -49.0 -49.2 78 -99 SPO 1997 04 29 03 27 9 11.1 -9 670.20 -49.2 -49.0 -49.2 78 -99 SPO 1997 04 29 03 28 9 11.1 -9 670.20 -49.2 -48.9 -49.2 78 -99 SPO 1997 04 29 03 29 8 10.9 -9 670.20 -49.1 -48.9 -49.2 78 -99 SPO 1997 04 29 03 30 8 11.0 -9 670.30 -49.0 -48.9 -49.2 77 -99 SPO 1997 04 29 03 31 8 11.1 -9 670.20 -49.1 -48.9 -49.2 77 -99 SPO 1997 04 29 03 32 9 11.3 -9 670.20 -49.1 -48.9 -49.2 76 -99 SPO 1997 04 29 03 33 8 10.8 -9 670.20 -49.1 -48.9 -49.2 75 -99 SPO 1997 04 29 03 34 8 10.6 -9 670.20 -49.1 -48.9 -49.2 74 -99 SPO 1997 04 29 03 35 6 10.5 -9 670.20 -49.1 -49.0 -49.3 74 -99 SPO 1997 04 29 03 36 6 11.2 -9 670.30 -49.1 -49.0 -49.2 75 -99 SPO 1997 04 29 03 37 6 11.2 -9 670.30 -49.1 -49.0 -49.2 76 -99 SPO 1997 04 29 03 38 6 10.6 -9 670.30 -49.1 -49.0 -49.2 77 -99 SPO 1997 04 29 03 39 6 11.0 -9 670.30 -49.1 -49.0 -49.2 78 -99 SPO 1997 04 29 03 40 5 10.8 -9 670.30 -49.1 -49.0 -49.2 78 -99 SPO 1997 04 29 03 41 4 10.9 -9 670.40 -49.1 -49.0 -49.2 79 -99 SPO 1997 04 29 03 42 3 11.1 -9 670.40 -49.1 -48.9 -49.1 79 -99 SPO 1997 04 29 03 43 3 10.8 -9 670.40 -49.0 -48.9 -49.1 76 -99 SPO 1997 04 29 03 44 2 10.9 -9 670.40 -49.0 -48.9 -49.1 76 -99 SPO 1997 04 29 03 45 3 10.8 -9 670.40 -49.0 -48.9 -49.1 75 -99 SPO 1997 04 29 03 46 2 11.2 -9 670.40 -49.0 -48.8 -49.1 75 -99 SPO 1997 04 29 03 47 2 11.2 -9 670.40 -49.0 -48.8 -49.0 75 -99 SPO 1997 04 29 03 48 1 10.9 -9 670.40 -48.9 -48.9 -49.1 75 -99 SPO 1997 04 29 03 49 2 11.2 -9 670.40 -48.9 -48.8 -49.1 75 -99 SPO 1997 04 29 03 50 2 11.0 -9 670.40 -48.9 -48.9 -49.1 76 -99 SPO 1997 04 29 03 51 2 11.2 -9 670.40 -48.9 -48.8 -49.1 76 -99 SPO 1997 04 29 03 52 2 11.3 -9 670.40 -48.9 -48.8 -49.0 76 -99 SPO 1997 04 29 03 53 2 10.9 -9 670.40 -48.9 -48.9 -49.1 75 -99 SPO 1997 04 29 03 54 2 11.0 -9 670.40 -48.9 -48.9 -49.1 76 -99 SPO 1997 04 29 03 55 2 11.0 -9 670.40 -48.9 -48.9 -49.0 75 -99 SPO 1997 04 29 03 56 2 10.6 -9 670.40 -48.9 -48.9 -49.1 74 -99 SPO 1997 04 29 03 57 2 10.8 -9 670.40 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 29 03 58 2 11.1 -9 670.40 -48.9 -48.9 -49.1 74 -99 SPO 1997 04 29 03 59 2 11.0 -9 670.40 -48.9 -48.9 -49.0 74 -99 SPO 1997 04 29 04 00 2 10.9 -9 670.40 -49.0 -48.9 -49.1 76 0 SPO 1997 04 29 04 01 4 11.2 -9 670.40 -48.9 -48.9 -49.0 75 -99 SPO 1997 04 29 04 02 5 10.9 -9 670.40 -48.9 -48.9 -49.0 75 -99 SPO 1997 04 29 04 03 5 11.0 -9 670.40 -48.9 -48.8 -49.1 76 -99 SPO 1997 04 29 04 04 5 11.2 -9 670.40 -48.9 -48.8 -49.0 76 -99 SPO 1997 04 29 04 05 5 11.5 -9 670.40 -48.9 -48.8 -49.0 77 -99 SPO 1997 04 29 04 06 6 11.4 -9 670.40 -48.9 -48.8 -49.0 80 -99 SPO 1997 04 29 04 07 6 11.2 -9 670.40 -48.8 -48.8 -49.0 80 -99 SPO 1997 04 29 04 08 6 11.3 -9 670.40 -48.8 -48.8 -49.0 79 -99 SPO 1997 04 29 04 09 6 11.2 -9 670.40 -48.9 -48.8 -49.0 79 -99 SPO 1997 04 29 04 10 6 10.9 -9 670.50 -48.9 -48.8 -49.0 78 -99 SPO 1997 04 29 04 11 6 11.3 -9 670.50 -48.8 -48.8 -49.0 78 -99 SPO 1997 04 29 04 12 5 11.1 -9 670.50 -48.9 -48.8 -49.0 80 -99 SPO 1997 04 29 04 13 5 11.0 -9 670.50 -48.9 -48.8 -49.0 81 -99 SPO 1997 04 29 04 14 5 11.0 -9 670.40 -48.9 -48.9 -49.0 81 -99 SPO 1997 04 29 04 15 5 11.2 -9 670.50 -48.9 -48.9 -49.0 82 -99 SPO 1997 04 29 04 16 5 10.9 -9 670.50 -48.9 -48.9 -49.1 82 -99 SPO 1997 04 29 04 17 6 11.1 -9 670.50 -48.9 -48.9 -49.1 82 -99 SPO 1997 04 29 04 18 5 11.0 -9 670.50 -49.0 -48.9 -49.1 82 -99 SPO 1997 04 29 04 19 5 10.7 -9 670.60 -49.0 -48.9 -49.1 81 -99 SPO 1997 04 29 04 20 5 10.7 -9 670.60 -49.0 -48.9 -49.1 80 -99 SPO 1997 04 29 04 21 5 10.8 -9 670.70 -49.0 -48.9 -49.1 80 -99 SPO 1997 04 29 04 22 5 11.0 -9 670.70 -49.0 -48.9 -49.1 80 -99 SPO 1997 04 29 04 23 6 10.4 -9 670.70 -49.0 -48.9 -49.1 80 -99 SPO 1997 04 29 04 24 7 10.5 -9 670.70 -49.0 -48.9 -49.2 81 -99 SPO 1997 04 29 04 25 7 10.8 -9 670.70 -49.0 -48.9 -49.1 80 -99 SPO 1997 04 29 04 26 6 9.9 -9 670.70 -49.0 -48.9 -49.2 81 -99 SPO 1997 04 29 04 27 6 9.9 -9 670.80 -49.0 -49.0 -49.2 80 -99 SPO 1997 04 29 04 28 8 9.6 -9 670.80 -49.0 -49.0 -49.2 80 -99 SPO 1997 04 29 04 29 8 9.5 -9 670.80 -49.1 -49.0 -49.2 81 -99 SPO 1997 04 29 04 30 7 9.4 -9 670.90 -49.1 -49.0 -49.2 79 -99 SPO 1997 04 29 04 31 7 8.8 -9 670.90 -49.1 -49.1 -49.2 79 -99 SPO 1997 04 29 04 32 8 8.8 -9 671.00 -49.2 -49.2 -49.3 79 -99 SPO 1997 04 29 04 33 9 8.4 -9 671.00 -49.2 -49.2 -49.3 78 -99 SPO 1997 04 29 04 34 11 8.2 -9 671.00 -49.2 -49.2 -49.3 78 -99 SPO 1997 04 29 04 35 13 8.5 -9 671.10 -49.2 -49.2 -49.3 78 -99 SPO 1997 04 29 04 36 14 8.0 -9 671.10 -49.2 -49.2 -49.4 79 -99 SPO 1997 04 29 04 37 15 8.1 -9 671.10 -49.2 -49.2 -49.3 79 -99 SPO 1997 04 29 04 38 15 8.2 -9 671.10 -49.3 -49.2 -49.4 80 -99 SPO 1997 04 29 04 39 17 8.0 -9 671.10 -49.3 -49.2 -49.4 79 -99 SPO 1997 04 29 04 40 17 8.1 -9 671.10 -49.3 -49.2 -49.4 79 -99 SPO 1997 04 29 04 41 17 8.3 -9 671.10 -49.3 -49.2 -49.4 79 -99 SPO 1997 04 29 04 42 17 8.1 -9 671.10 -49.2 -49.2 -49.4 78 -99 SPO 1997 04 29 04 43 16 8.7 -9 671.10 -49.2 -49.2 -49.4 77 -99 SPO 1997 04 29 04 44 18 8.7 -9 671.00 -49.3 -49.2 -49.4 77 -99 SPO 1997 04 29 04 45 17 8.5 -9 671.10 -49.3 -49.1 -49.4 77 -99 SPO 1997 04 29 04 46 17 8.6 -9 671.00 -49.3 -49.1 -49.4 76 -99 SPO 1997 04 29 04 47 17 8.7 -9 671.10 -49.3 -49.2 -49.4 77 -99 SPO 1997 04 29 04 48 18 9.0 -9 671.10 -49.3 -49.2 -49.4 77 -99 SPO 1997 04 29 04 49 19 8.4 -9 671.10 -49.3 -49.2 -49.4 77 -99 SPO 1997 04 29 04 50 18 8.3 -9 671.10 -49.3 -49.2 -49.4 76 -99 SPO 1997 04 29 04 51 17 8.5 -9 671.10 -49.3 -49.3 -49.4 76 -99 SPO 1997 04 29 04 52 18 8.0 -9 671.10 -49.3 -49.3 -49.4 76 -99 SPO 1997 04 29 04 53 18 7.9 -9 671.10 -49.4 -49.3 -49.5 77 -99 SPO 1997 04 29 04 54 19 8.1 -9 671.10 -49.4 -49.3 -49.4 76 -99 SPO 1997 04 29 04 55 20 8.1 -9 671.10 -49.4 -49.3 -49.4 76 -99 SPO 1997 04 29 04 56 20 8.3 -9 671.10 -49.4 -49.3 -49.4 74 -99 SPO 1997 04 29 04 57 21 7.7 -9 671.10 -49.4 -49.3 -49.5 74 -99 SPO 1997 04 29 04 58 22 7.9 -9 671.10 -49.5 -49.3 -49.5 75 -99 SPO 1997 04 29 04 59 22 7.8 -9 671.10 -49.4 -49.3 -49.5 74 -99 SPO 1997 04 29 05 00 23 7.9 -9 671.10 -49.4 -49.3 -49.5 75 0 SPO 1997 04 29 05 01 22 7.8 -9 671.10 -49.4 -49.3 -49.5 75 -99 SPO 1997 04 29 05 02 23 8.0 -9 671.10 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 05 03 23 7.6 -9 671.20 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 05 04 23 7.2 -9 671.20 -49.4 -49.2 -49.5 76 -99 SPO 1997 04 29 05 05 24 7.6 -9 671.20 -49.4 -49.2 -49.5 75 -99 SPO 1997 04 29 05 06 23 7.2 -9 671.20 -49.4 -49.3 -49.5 74 -99 SPO 1997 04 29 05 07 23 7.0 -9 671.30 -49.5 -49.3 -49.5 74 -99 SPO 1997 04 29 05 08 24 6.8 -9 671.30 -49.5 -49.4 -49.6 74 -99 SPO 1997 04 29 05 09 26 7.1 -9 671.30 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 05 10 26 6.8 -9 671.30 -49.5 -49.4 -49.6 73 -99 SPO 1997 04 29 05 11 28 6.7 -9 671.30 -49.6 -49.4 -49.7 75 -99 SPO 1997 04 29 05 12 27 6.4 -9 671.30 -49.6 -49.4 -49.7 75 -99 SPO 1997 04 29 05 13 28 6.5 -9 671.30 -49.6 -49.5 -49.7 75 -99 SPO 1997 04 29 05 14 28 6.2 -9 671.30 -49.7 -49.4 -49.7 75 -99 SPO 1997 04 29 05 15 26 6.7 -9 671.30 -49.6 -49.4 -49.7 74 -99 SPO 1997 04 29 05 16 27 6.1 -9 671.30 -49.7 -49.4 -49.7 75 -99 SPO 1997 04 29 05 17 25 6.2 -9 671.30 -49.6 -49.4 -49.7 74 -99 SPO 1997 04 29 05 18 24 7.1 -9 671.30 -49.6 -49.4 -49.6 73 -99 SPO 1997 04 29 05 19 22 7.4 -9 671.30 -49.5 -49.3 -49.5 71 -99 SPO 1997 04 29 05 20 22 7.7 -9 671.20 -49.5 -49.2 -49.5 71 -99 SPO 1997 04 29 05 21 22 7.8 -9 671.20 -49.5 -49.2 -49.5 71 -99 SPO 1997 04 29 05 22 20 7.8 -9 671.20 -49.4 -49.1 -49.5 70 -99 SPO 1997 04 29 05 23 20 8.1 -9 671.20 -49.4 -49.1 -49.5 70 -99 SPO 1997 04 29 05 24 19 7.6 -9 671.20 -49.4 -49.2 -49.5 70 -99 SPO 1997 04 29 05 25 18 8.0 -9 671.20 -49.4 -49.2 -49.5 73 -99 SPO 1997 04 29 05 26 18 7.8 -9 671.20 -49.4 -49.2 -49.5 73 -99 SPO 1997 04 29 05 27 16 8.1 -9 671.20 -49.4 -49.2 -49.4 74 -99 SPO 1997 04 29 05 28 16 7.6 -9 671.30 -49.4 -49.2 -49.4 74 -99 SPO 1997 04 29 05 29 16 7.8 -9 671.30 -49.4 -49.2 -49.5 74 -99 SPO 1997 04 29 05 30 16 7.9 -9 671.30 -49.4 -49.2 -49.4 73 -99 SPO 1997 04 29 05 31 15 7.6 -9 671.30 -49.4 -49.2 -49.4 73 -99 SPO 1997 04 29 05 32 13 7.9 -9 671.30 -49.4 -49.2 -49.5 73 -99 SPO 1997 04 29 05 33 12 8.2 -9 671.30 -49.4 -49.1 -49.5 73 -99 SPO 1997 04 29 05 34 11 8.0 -9 671.30 -49.4 -49.1 -49.4 73 -99 SPO 1997 04 29 05 35 12 7.8 -9 671.20 -49.4 -49.1 -49.4 73 -99 SPO 1997 04 29 05 36 11 8.1 -9 671.30 -49.3 -49.1 -49.5 73 -99 SPO 1997 04 29 05 37 11 7.8 -9 671.30 -49.4 -49.1 -49.5 74 -99 SPO 1997 04 29 05 38 9 7.9 -9 671.30 -49.4 -49.1 -49.5 74 -99 SPO 1997 04 29 05 39 8 7.8 -9 671.30 -49.4 -49.1 -49.4 75 -99 SPO 1997 04 29 05 40 7 7.6 -9 671.30 -49.4 -49.0 -49.5 75 -99 SPO 1997 04 29 05 41 8 7.8 -9 671.30 -49.4 -49.1 -49.5 74 -99 SPO 1997 04 29 05 42 8 8.0 -9 671.30 -49.4 -49.1 -49.5 74 -99 SPO 1997 04 29 05 43 9 8.1 -9 671.20 -49.5 -49.2 -49.5 74 -99 SPO 1997 04 29 05 44 9 8.4 -9 671.20 -49.4 -49.1 -49.5 73 -99 SPO 1997 04 29 05 45 8 8.5 -9 671.20 -49.4 -49.1 -49.4 73 -99 SPO 1997 04 29 05 46 9 8.4 -9 671.20 -49.4 -49.1 -49.4 74 -99 SPO 1997 04 29 05 47 8 8.5 -9 671.20 -49.4 -49.1 -49.5 74 -99 SPO 1997 04 29 05 48 9 8.6 -9 671.20 -49.4 -49.1 -49.4 75 -99 SPO 1997 04 29 05 49 9 8.8 -9 671.20 -49.4 -49.1 -49.4 75 -99 SPO 1997 04 29 05 50 8 9.0 -9 671.20 -49.4 -49.0 -49.4 75 -99 SPO 1997 04 29 05 51 8 8.8 -9 671.20 -49.4 -49.0 -49.4 76 -99 SPO 1997 04 29 05 52 10 9.1 -9 671.20 -49.4 -49.0 -49.4 76 -99 SPO 1997 04 29 05 53 9 9.8 -9 671.20 -49.4 -49.0 -49.4 76 -99 SPO 1997 04 29 05 54 11 9.4 -9 671.20 -49.2 -49.0 -49.3 74 -99 SPO 1997 04 29 05 55 11 9.1 -9 671.20 -49.2 -49.0 -49.4 73 -99 SPO 1997 04 29 05 56 11 8.8 -9 671.20 -49.3 -49.0 -49.4 73 -99 SPO 1997 04 29 05 57 11 8.4 -9 671.20 -49.3 -49.0 -49.4 73 -99 SPO 1997 04 29 05 58 10 8.5 -9 671.30 -49.3 -49.0 -49.4 73 -99 SPO 1997 04 29 05 59 10 8.6 -9 671.30 -49.3 -49.0 -49.3 73 -99 SPO 1997 04 29 06 00 11 8.5 -9 671.30 -49.2 -49.0 -49.3 73 0 SPO 1997 04 29 06 01 11 8.8 -9 671.30 -49.3 -49.0 -49.3 74 -99 SPO 1997 04 29 06 02 10 8.9 -9 671.30 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 03 11 8.5 -9 671.30 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 04 9 8.3 -9 671.40 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 05 11 8.7 -9 671.30 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 06 10 9.0 -9 671.30 -49.2 -49.1 -49.3 73 -99 SPO 1997 04 29 06 07 10 8.9 -9 671.30 -49.3 -49.1 -49.3 73 -99 SPO 1997 04 29 06 08 10 9.6 -9 671.40 -49.2 -49.1 -49.2 72 -99 SPO 1997 04 29 06 09 9 8.9 -9 671.40 -49.2 -49.1 -49.3 72 -99 SPO 1997 04 29 06 10 9 9.2 -9 671.40 -49.2 -49.1 -49.3 73 -99 SPO 1997 04 29 06 11 11 8.8 -9 671.30 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 12 9 9.2 -9 671.30 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 13 8 9.2 -9 671.40 -49.1 -49.1 -49.2 74 -99 SPO 1997 04 29 06 14 8 9.0 -9 671.40 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 15 8 9.5 -9 671.40 -49.2 -49.0 -49.2 75 -99 SPO 1997 04 29 06 16 8 9.0 -9 671.40 -49.2 -49.0 -49.3 75 -99 SPO 1997 04 29 06 17 5 8.8 -9 671.40 -49.2 -49.0 -49.3 75 -99 SPO 1997 04 29 06 18 7 8.8 -9 671.40 -49.2 -49.1 -49.3 74 -99 SPO 1997 04 29 06 19 6 9.9 -9 671.40 -49.2 -49.2 -49.3 74 -99 SPO 1997 04 29 06 20 8 10.0 -9 671.20 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 29 06 21 7 9.7 -9 671.30 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 29 06 22 6 10.4 -9 671.30 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 29 06 23 4 9.9 -9 671.30 -49.2 -49.2 -49.4 73 -99 SPO 1997 04 29 06 24 4 9.4 -9 671.30 -49.2 -49.2 -49.4 73 -99 SPO 1997 04 29 06 25 4 9.0 -9 671.30 -49.3 -49.3 -49.4 75 -99 SPO 1997 04 29 06 26 5 9.2 -9 671.40 -49.4 -49.3 -49.5 76 -99 SPO 1997 04 29 06 27 5 9.6 -9 671.40 -49.4 -49.3 -49.4 76 -99 SPO 1997 04 29 06 28 6 10.4 -9 671.30 -49.4 -49.3 -49.4 76 -99 SPO 1997 04 29 06 29 6 9.4 -9 671.40 -49.4 -49.3 -49.5 76 -99 SPO 1997 04 29 06 30 8 9.5 -9 671.30 -49.4 -49.4 -49.5 74 -99 SPO 1997 04 29 06 31 7 9.5 -9 671.40 -49.3 -49.4 -49.6 73 -99 SPO 1997 04 29 06 32 9 9.6 -9 671.30 -49.4 -49.4 -49.6 73 -99 SPO 1997 04 29 06 33 10 9.9 -9 671.30 -49.5 -49.4 -49.6 74 -99 SPO 1997 04 29 06 34 7 9.5 -9 671.30 -49.5 -49.4 -49.6 75 -99 SPO 1997 04 29 06 35 10 9.9 -9 671.30 -49.5 -49.4 -49.6 75 -99 SPO 1997 04 29 06 36 11 10.5 -9 671.20 -49.5 -49.4 -49.6 75 -99 SPO 1997 04 29 06 37 10 10.4 -9 671.20 -49.5 -49.5 -49.6 75 -99 SPO 1997 04 29 06 38 9 10.6 -9 671.20 -49.6 -49.5 -49.7 76 -99 SPO 1997 04 29 06 39 10 9.8 -9 671.20 -49.6 -49.6 -49.7 76 -99 SPO 1997 04 29 06 40 11 9.4 -9 671.20 -49.6 -49.6 -49.8 76 -99 SPO 1997 04 29 06 41 9 9.5 -9 671.30 -49.7 -49.6 -49.8 77 -99 SPO 1997 04 29 06 42 10 9.6 -9 671.30 -49.7 -49.6 -49.8 75 -99 SPO 1997 04 29 06 43 8 8.8 -9 671.40 -49.7 -49.7 -49.8 74 -99 SPO 1997 04 29 06 44 8 8.9 -9 671.40 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 29 06 45 9 8.8 -9 671.40 -49.8 -49.7 -49.9 73 -99 SPO 1997 04 29 06 46 7 9.1 -9 671.40 -49.7 -49.8 -49.9 73 -99 SPO 1997 04 29 06 47 6 8.9 -9 671.50 -49.8 -49.7 -49.9 75 -99 SPO 1997 04 29 06 48 7 8.8 -9 671.50 -49.8 -49.7 -50.0 75 -99 SPO 1997 04 29 06 49 6 8.9 -9 671.50 -49.9 -49.8 -50.0 76 -99 SPO 1997 04 29 06 50 3 8.9 -9 671.50 -49.9 -49.8 -50.0 76 -99 SPO 1997 04 29 06 51 5 9.6 -9 671.40 -49.9 -49.8 -50.0 76 -99 SPO 1997 04 29 06 52 4 9.1 -9 671.50 -49.9 -49.8 -50.0 74 -99 SPO 1997 04 29 06 53 8 9.4 -9 671.40 -49.9 -49.8 -50.1 73 -99 SPO 1997 04 29 06 54 5 9.7 -9 671.40 -49.9 -49.9 -50.0 73 -99 SPO 1997 04 29 06 55 4 9.1 -9 671.50 -50.0 -50.0 -50.1 73 -99 SPO 1997 04 29 06 56 5 9.2 -9 671.40 -50.0 -50.0 -50.1 73 -99 SPO 1997 04 29 06 57 4 9.1 -9 671.40 -50.0 -50.0 -50.2 73 -99 SPO 1997 04 29 06 58 7 8.9 -9 671.50 -50.1 -50.0 -50.2 74 -99 SPO 1997 04 29 06 59 9 8.8 -9 671.40 -50.1 -50.0 -50.2 74 -99 SPO 1997 04 29 07 00 8 8.8 -9 671.40 -50.2 -50.1 -50.3 75 0 SPO 1997 04 29 07 01 8 8.7 -9 671.50 -50.2 -50.1 -50.2 75 -99 SPO 1997 04 29 07 02 9 8.6 -9 671.50 -50.2 -50.1 -50.3 75 -99 SPO 1997 04 29 07 03 10 8.8 -9 671.40 -50.1 -50.1 -50.3 74 -99 SPO 1997 04 29 07 04 9 9.2 -9 671.50 -50.2 -50.1 -50.3 74 -99 SPO 1997 04 29 07 05 10 9.2 -9 671.40 -50.2 -50.1 -50.3 73 -99 SPO 1997 04 29 07 06 8 8.8 -9 671.40 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 07 07 9 9.3 -9 671.50 -50.2 -50.1 -50.3 72 -99 SPO 1997 04 29 07 08 10 9.2 -9 671.40 -50.2 -50.1 -50.4 72 -99 SPO 1997 04 29 07 09 13 9.6 -9 671.40 -50.3 -50.1 -50.4 72 -99 SPO 1997 04 29 07 10 10 9.4 -9 671.40 -50.3 -50.1 -50.4 73 -99 SPO 1997 04 29 07 11 9 9.3 -9 671.50 -50.3 -50.1 -50.5 73 -99 SPO 1997 04 29 07 12 9 9.6 -9 671.50 -50.3 -50.2 -50.4 73 -99 SPO 1997 04 29 07 13 9 9.0 -9 671.50 -50.4 -50.3 -50.5 74 -99 SPO 1997 04 29 07 14 10 9.4 -9 671.50 -50.4 -50.3 -50.6 74 -99 SPO 1997 04 29 07 15 9 9.2 -9 671.50 -50.5 -50.4 -50.6 75 -99 SPO 1997 04 29 07 16 5 9.4 -9 671.60 -50.5 -50.4 -50.6 74 -99 SPO 1997 04 29 07 17 7 8.7 -9 671.60 -50.5 -50.4 -50.6 74 -99 SPO 1997 04 29 07 18 6 9.2 -9 671.60 -50.6 -50.4 -50.6 74 -99 SPO 1997 04 29 07 19 5 8.6 -9 671.70 -50.6 -50.5 -50.6 73 -99 SPO 1997 04 29 07 20 6 8.8 -9 671.70 -50.6 -50.5 -50.7 73 -99 SPO 1997 04 29 07 21 8 8.9 -9 671.70 -50.6 -50.5 -50.8 73 -99 SPO 1997 04 29 07 22 8 8.3 -9 671.70 -50.7 -50.5 -50.8 74 -99 SPO 1997 04 29 07 23 5 8.3 -9 671.80 -50.7 -50.6 -50.8 73 -99 SPO 1997 04 29 07 24 4 8.3 -9 671.80 -50.7 -50.5 -50.8 73 -99 SPO 1997 04 29 07 25 6 7.8 -9 671.80 -50.7 -50.6 -50.8 74 -99 SPO 1997 04 29 07 26 7 8.4 -9 671.80 -50.8 -50.6 -50.9 74 -99 SPO 1997 04 29 07 27 10 8.6 -9 671.80 -50.8 -50.6 -50.9 74 -99 SPO 1997 04 29 07 28 8 8.6 -9 671.80 -50.8 -50.6 -50.9 73 -99 SPO 1997 04 29 07 29 7 8.2 -9 671.80 -50.8 -50.6 -50.9 72 -99 SPO 1997 04 29 07 30 9 8.4 -9 671.80 -50.8 -50.7 -51.0 71 -99 SPO 1997 04 29 07 31 9 9.0 -9 671.70 -50.9 -50.7 -51.0 72 -99 SPO 1997 04 29 07 32 8 8.6 -9 671.70 -50.8 -50.8 -51.0 71 -99 SPO 1997 04 29 07 33 7 8.6 -9 671.70 -50.8 -50.8 -51.0 72 -99 SPO 1997 04 29 07 34 6 9.0 -9 671.80 -50.9 -50.8 -51.0 73 -99 SPO 1997 04 29 07 35 5 8.9 -9 671.80 -50.9 -50.8 -51.0 73 -99 SPO 1997 04 29 07 36 7 9.2 -9 671.70 -50.8 -50.8 -51.0 72 -99 SPO 1997 04 29 07 37 6 9.2 -9 671.70 -50.9 -50.8 -51.0 73 -99 SPO 1997 04 29 07 38 6 9.2 -9 671.70 -50.9 -50.8 -51.0 73 -99 SPO 1997 04 29 07 39 8 9.4 -9 671.60 -50.9 -50.7 -51.0 72 -99 SPO 1997 04 29 07 40 8 9.4 -9 671.60 -51.0 -50.8 -51.1 73 -99 SPO 1997 04 29 07 41 8 9.3 -9 671.60 -51.0 -50.8 -51.1 72 -99 SPO 1997 04 29 07 42 7 9.3 -9 671.70 -51.0 -50.8 -51.1 72 -99 SPO 1997 04 29 07 43 9 9.1 -9 671.70 -51.0 -50.8 -51.1 72 -99 SPO 1997 04 29 07 44 9 9.4 -9 671.60 -51.0 -50.8 -51.1 72 -99 SPO 1997 04 29 07 45 7 9.3 -9 671.70 -51.0 -50.8 -51.1 72 -99 SPO 1997 04 29 07 46 8 9.4 -9 671.70 -51.0 -50.8 -51.1 71 -99 SPO 1997 04 29 07 47 9 9.9 -9 671.70 -51.0 -50.8 -51.1 71 -99 SPO 1997 04 29 07 48 9 9.8 -9 671.70 -51.0 -50.8 -51.1 71 -99 SPO 1997 04 29 07 49 7 9.5 -9 671.70 -51.0 -50.9 -51.1 71 -99 SPO 1997 04 29 07 50 5 9.3 -9 671.80 -51.0 -50.9 -51.1 72 -99 SPO 1997 04 29 07 51 5 8.9 -9 671.80 -51.0 -50.9 -51.1 72 -99 SPO 1997 04 29 07 52 5 8.8 -9 671.80 -51.0 -51.0 -51.2 71 -99 SPO 1997 04 29 07 53 5 9.1 -9 671.80 -51.0 -50.9 -51.1 71 -99 SPO 1997 04 29 07 54 3 9.1 -9 671.80 -51.0 -50.9 -51.1 71 -99 SPO 1997 04 29 07 55 5 8.9 -9 671.80 -51.1 -50.9 -51.2 71 -99 SPO 1997 04 29 07 56 6 9.1 -9 671.80 -51.1 -50.9 -51.2 71 -99 SPO 1997 04 29 07 57 5 9.0 -9 671.80 -51.1 -50.9 -51.2 71 -99 SPO 1997 04 29 07 58 5 9.0 -9 671.80 -51.1 -50.9 -51.2 71 -99 SPO 1997 04 29 07 59 5 9.1 -9 671.80 -51.1 -50.9 -51.2 72 -99 SPO 1997 04 29 08 00 3 8.7 -9 671.80 -51.1 -51.0 -51.2 72 0 SPO 1997 04 29 08 01 3 8.7 -9 671.80 -51.1 -50.9 -51.3 72 -99 SPO 1997 04 29 08 02 3 8.8 -9 671.80 -51.2 -51.0 -51.2 73 -99 SPO 1997 04 29 08 03 3 8.8 -9 671.90 -51.2 -50.9 -51.2 72 -99 SPO 1997 04 29 08 04 3 8.7 -9 671.90 -51.2 -50.9 -51.2 71 -99 SPO 1997 04 29 08 05 3 8.2 -9 671.90 -51.2 -51.0 -51.3 71 -99 SPO 1997 04 29 08 06 2 8.1 -9 672.00 -51.2 -51.0 -51.3 71 -99 SPO 1997 04 29 08 07 4 8.0 -9 672.00 -51.2 -51.1 -51.3 71 -99 SPO 1997 04 29 08 08 2 7.9 -9 672.00 -51.2 -51.1 -51.4 71 -99 SPO 1997 04 29 08 09 4 8.3 -9 672.00 -51.2 -51.1 -51.3 71 -99 SPO 1997 04 29 08 10 4 8.2 -9 672.00 -51.2 -51.1 -51.4 71 -99 SPO 1997 04 29 08 11 6 8.3 -9 672.00 -51.3 -51.2 -51.4 72 -99 SPO 1997 04 29 08 12 3 8.0 -9 672.00 -51.3 -51.1 -51.3 72 -99 SPO 1997 04 29 08 13 1 8.2 -9 672.10 -51.3 -51.1 -51.4 72 -99 SPO 1997 04 29 08 14 3 8.3 -9 672.10 -51.3 -51.1 -51.4 72 -99 SPO 1997 04 29 08 15 4 8.1 -9 672.10 -51.3 -51.1 -51.4 71 -99 SPO 1997 04 29 08 16 4 8.2 -9 672.10 -51.4 -51.2 -51.5 71 -99 SPO 1997 04 29 08 17 5 7.9 -9 672.10 -51.4 -51.2 -51.5 71 -99 SPO 1997 04 29 08 18 3 7.6 -9 672.10 -51.4 -51.2 -51.5 70 -99 SPO 1997 04 29 08 19 2 7.1 -9 672.20 -51.4 -51.2 -51.5 70 -99 SPO 1997 04 29 08 20 2 7.8 -9 672.20 -51.4 -51.2 -51.6 71 -99 SPO 1997 04 29 08 21 360 7.2 -9 672.20 -51.5 -51.2 -51.5 72 -99 SPO 1997 04 29 08 22 1 7.3 -9 672.20 -51.5 -51.3 -51.6 72 -99 SPO 1997 04 29 08 23 2 7.0 -9 672.20 -51.5 -51.3 -51.6 72 -99 SPO 1997 04 29 08 24 359 7.8 -9 672.20 -51.5 -51.3 -51.6 72 -99 SPO 1997 04 29 08 25 360 6.9 -9 672.20 -51.5 -51.4 -51.6 73 -99 SPO 1997 04 29 08 26 358 7.2 -9 672.20 -51.5 -51.4 -51.6 72 -99 SPO 1997 04 29 08 27 358 7.3 -9 672.30 -51.5 -51.4 -51.6 71 -99 SPO 1997 04 29 08 28 357 7.2 -9 672.30 -51.6 -51.4 -51.6 71 -99 SPO 1997 04 29 08 29 357 7.0 -9 672.30 -51.6 -51.4 -51.7 71 -99 SPO 1997 04 29 08 30 358 7.2 -9 672.40 -51.6 -51.4 -51.7 70 -99 SPO 1997 04 29 08 31 359 7.2 -9 672.30 -51.6 -51.4 -51.7 70 -99 SPO 1997 04 29 08 32 0 7.3 -9 672.30 -51.6 -51.4 -51.7 71 -99 SPO 1997 04 29 08 33 1 7.3 -9 672.30 -51.6 -51.4 -51.6 71 -99 SPO 1997 04 29 08 34 2 7.1 -9 672.30 -51.6 -51.4 -51.7 72 -99 SPO 1997 04 29 08 35 2 7.0 -9 672.40 -51.6 -51.4 -51.7 72 -99 SPO 1997 04 29 08 36 2 7.2 -9 672.40 -51.6 -51.4 -51.7 72 -99 SPO 1997 04 29 08 37 3 6.9 -9 672.30 -51.6 -51.4 -51.8 72 -99 SPO 1997 04 29 08 38 2 7.3 -9 672.40 -51.7 -51.4 -51.7 73 -99 SPO 1997 04 29 08 39 2 6.9 -9 672.40 -51.6 -51.4 -51.7 71 -99 SPO 1997 04 29 08 40 1 7.3 -9 672.40 -51.6 -51.4 -51.7 70 -99 SPO 1997 04 29 08 41 2 6.7 -9 672.40 -51.6 -51.5 -51.7 70 -99 SPO 1997 04 29 08 42 3 6.8 -9 672.40 -51.7 -51.5 -51.8 70 -99 SPO 1997 04 29 08 43 4 6.8 -9 672.40 -51.7 -51.6 -51.8 70 -99 SPO 1997 04 29 08 44 3 7.0 -9 672.40 -51.7 -51.6 -51.8 70 -99 SPO 1997 04 29 08 45 5 7.2 -9 672.40 -51.7 -51.6 -51.8 70 -99 SPO 1997 04 29 08 46 6 7.2 -9 672.40 -51.8 -51.6 -51.8 72 -99 SPO 1997 04 29 08 47 6 7.2 -9 672.40 -51.8 -51.6 -51.8 72 -99 SPO 1997 04 29 08 48 7 7.4 -9 672.30 -51.8 -51.6 -51.8 72 -99 SPO 1997 04 29 08 49 9 7.5 -9 672.30 -51.8 -51.6 -51.8 73 -99 SPO 1997 04 29 08 50 9 7.3 -9 672.20 -51.8 -51.6 -51.9 72 -99 SPO 1997 04 29 08 51 8 7.7 -9 672.20 -51.8 -51.6 -51.8 72 -99 SPO 1997 04 29 08 52 8 7.3 -9 672.20 -51.8 -51.6 -51.9 72 -99 SPO 1997 04 29 08 53 8 7.5 -9 672.30 -51.8 -51.6 -51.9 71 -99 SPO 1997 04 29 08 54 9 7.6 -9 672.20 -51.8 -51.6 -51.9 72 -99 SPO 1997 04 29 08 55 9 7.7 -9 672.20 -51.9 -51.6 -52.0 73 -99 SPO 1997 04 29 08 56 8 7.9 -9 672.30 -51.9 -51.6 -52.0 73 -99 SPO 1997 04 29 08 57 8 8.1 -9 672.30 -51.9 -51.6 -52.0 73 -99 SPO 1997 04 29 08 58 8 7.7 -9 672.30 -51.9 -51.6 -52.0 73 -99 SPO 1997 04 29 08 59 8 8.1 -9 672.30 -51.9 -51.7 -52.0 73 -99 SPO 1997 04 29 09 00 8 8.3 -9 672.30 -51.9 -51.7 -51.9 73 0 SPO 1997 04 29 09 01 8 8.2 -9 672.20 -51.9 -51.7 -51.9 73 -99 SPO 1997 04 29 09 02 7 8.2 -9 672.30 -51.8 -51.7 -51.9 71 -99 SPO 1997 04 29 09 03 7 8.0 -9 672.30 -51.9 -51.7 -52.0 71 -99 SPO 1997 04 29 09 04 8 8.3 -9 672.30 -51.9 -51.7 -52.0 71 -99 SPO 1997 04 29 09 05 7 8.4 -9 672.20 -51.9 -51.7 -52.0 70 -99 SPO 1997 04 29 09 06 7 8.3 -9 672.20 -52.0 -51.7 -52.1 71 -99 SPO 1997 04 29 09 07 7 8.7 -9 672.20 -51.9 -51.7 -52.0 70 -99 SPO 1997 04 29 09 08 5 8.3 -9 672.30 -52.0 -51.7 -52.0 71 -99 SPO 1997 04 29 09 09 5 8.5 -9 672.30 -52.0 -51.7 -52.1 72 -99 SPO 1997 04 29 09 10 5 8.8 -9 672.30 -52.0 -51.7 -52.0 72 -99 SPO 1997 04 29 09 11 5 8.8 -9 672.30 -51.9 -51.7 -52.0 71 -99 SPO 1997 04 29 09 12 3 8.3 -9 672.30 -51.9 -51.7 -52.0 71 -99 SPO 1997 04 29 09 13 3 8.3 -9 672.30 -52.0 -51.7 -52.1 72 -99 SPO 1997 04 29 09 14 1 8.2 -9 672.40 -52.0 -51.7 -52.0 71 -99 SPO 1997 04 29 09 15 2 8.4 -9 672.40 -52.0 -51.8 -52.1 71 -99 SPO 1997 04 29 09 16 2 8.4 -9 672.40 -52.0 -51.8 -52.1 70 -99 SPO 1997 04 29 09 17 1 8.6 -9 672.40 -52.0 -51.8 -52.1 71 -99 SPO 1997 04 29 09 18 1 8.3 -9 672.40 -52.0 -51.8 -52.1 71 -99 SPO 1997 04 29 09 19 2 8.4 -9 672.40 -52.0 -51.8 -52.1 71 -99 SPO 1997 04 29 09 20 2 8.5 -9 672.30 -52.0 -51.9 -52.2 71 -99 SPO 1997 04 29 09 21 3 8.6 -9 672.40 -52.1 -51.8 -52.2 72 -99 SPO 1997 04 29 09 22 2 8.3 -9 672.40 -52.1 -51.9 -52.2 72 -99 SPO 1997 04 29 09 23 3 8.4 -9 672.40 -52.1 -51.9 -52.2 73 -99 SPO 1997 04 29 09 24 4 8.4 -9 672.40 -52.1 -51.9 -52.2 73 -99 SPO 1997 04 29 09 25 3 8.2 -9 672.40 -52.1 -51.9 -52.2 72 -99 SPO 1997 04 29 09 26 3 8.0 -9 672.40 -52.1 -51.9 -52.2 72 -99 SPO 1997 04 29 09 27 3 8.0 -9 672.40 -52.2 -51.9 -52.3 73 -99 SPO 1997 04 29 09 28 5 8.1 -9 672.40 -52.2 -51.9 -52.3 71 -99 SPO 1997 04 29 09 29 5 7.8 -9 672.40 -52.2 -51.9 -52.4 71 -99 SPO 1997 04 29 09 30 4 7.6 -9 672.50 -52.3 -51.9 -52.4 74 -99 SPO 1997 04 29 09 31 4 7.9 -9 672.50 -52.3 -51.9 -52.4 72 -99 SPO 1997 04 29 09 32 5 7.6 -9 672.50 -52.3 -52.0 -52.4 71 -99 SPO 1997 04 29 09 33 6 7.8 -9 672.50 -52.3 -52.0 -52.4 71 -99 SPO 1997 04 29 09 34 4 7.7 -9 672.50 -52.3 -52.1 -52.4 72 -99 SPO 1997 04 29 09 35 5 7.6 -9 672.50 -52.3 -52.1 -52.5 72 -99 SPO 1997 04 29 09 36 6 7.7 -9 672.50 -52.4 -52.1 -52.5 72 -99 SPO 1997 04 29 09 37 6 7.6 -9 672.50 -52.4 -52.2 -52.5 72 -99 SPO 1997 04 29 09 38 7 7.7 -9 672.50 -52.4 -52.2 -52.5 71 -99 SPO 1997 04 29 09 39 6 7.3 -9 672.60 -52.5 -52.2 -52.5 71 -99 SPO 1997 04 29 09 40 6 7.3 -9 672.60 -52.4 -52.2 -52.5 70 -99 SPO 1997 04 29 09 41 7 7.4 -9 672.60 -52.5 -52.2 -52.6 71 -99 SPO 1997 04 29 09 42 7 7.1 -9 672.60 -52.5 -52.2 -52.6 71 -99 SPO 1997 04 29 09 43 7 7.2 -9 672.60 -52.5 -52.2 -52.6 71 -99 SPO 1997 04 29 09 44 7 7.3 -9 672.60 -52.5 -52.2 -52.6 71 -99 SPO 1997 04 29 09 45 7 7.2 -9 672.60 -52.6 -52.2 -52.6 73 -99 SPO 1997 04 29 09 46 7 7.6 -9 672.60 -52.6 -52.3 -52.7 72 -99 SPO 1997 04 29 09 47 8 7.3 -9 672.60 -52.6 -52.3 -52.6 72 -99 SPO 1997 04 29 09 48 8 7.3 -9 672.60 -52.6 -52.3 -52.7 72 -99 SPO 1997 04 29 09 49 8 7.2 -9 672.60 -52.6 -52.3 -52.7 71 -99 SPO 1997 04 29 09 50 8 7.2 -9 672.60 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 09 51 6 7.2 -9 672.60 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 09 52 6 7.1 -9 672.60 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 09 53 5 7.1 -9 672.60 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 09 54 5 7.1 -9 672.70 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 09 55 5 7.4 -9 672.70 -52.6 -52.4 -52.7 71 -99 SPO 1997 04 29 09 56 3 7.0 -9 672.70 -52.6 -52.5 -52.7 71 -99 SPO 1997 04 29 09 57 3 7.2 -9 672.70 -52.6 -52.5 -52.7 71 -99 SPO 1997 04 29 09 58 3 7.2 -9 672.70 -52.6 -52.5 -52.7 71 -99 SPO 1997 04 29 09 59 2 6.9 -9 672.80 -52.6 -52.4 -52.7 71 -99 SPO 1997 04 29 10 00 3 7.2 -9 672.80 -52.6 -52.5 -52.7 71 0 SPO 1997 04 29 10 01 3 7.4 -9 672.80 -52.6 -52.4 -52.7 70 -99 SPO 1997 04 29 10 02 3 7.5 -9 672.80 -52.6 -52.4 -52.6 69 -99 SPO 1997 04 29 10 03 3 7.3 -9 672.80 -52.6 -52.4 -52.6 69 -99 SPO 1997 04 29 10 04 2 7.5 -9 672.80 -52.6 -52.4 -52.7 69 -99 SPO 1997 04 29 10 05 1 7.3 -9 672.80 -52.6 -52.4 -52.6 69 -99 SPO 1997 04 29 10 06 1 7.3 -9 672.80 -52.6 -52.4 -52.6 69 -99 SPO 1997 04 29 10 07 359 7.3 -9 672.80 -52.6 -52.5 -52.7 69 -99 SPO 1997 04 29 10 08 359 7.5 -9 672.80 -52.6 -52.5 -52.7 70 -99 SPO 1997 04 29 10 09 359 7.1 -9 672.80 -52.6 -52.5 -52.6 71 -99 SPO 1997 04 29 10 10 358 7.3 -9 672.90 -52.6 -52.6 -52.7 72 -99 SPO 1997 04 29 10 11 358 6.7 -9 672.90 -52.6 -52.6 -52.7 72 -99 SPO 1997 04 29 10 12 357 6.7 -9 672.90 -52.7 -52.6 -52.8 72 -99 SPO 1997 04 29 10 13 357 6.8 -9 672.90 -52.7 -52.6 -52.8 71 -99 SPO 1997 04 29 10 14 356 6.9 -9 672.90 -52.7 -52.6 -52.8 71 -99 SPO 1997 04 29 10 15 356 7.1 -9 672.90 -52.7 -52.6 -52.8 70 -99 SPO 1997 04 29 10 16 357 7.5 -9 672.90 -52.8 -52.6 -52.8 71 -99 SPO 1997 04 29 10 17 358 7.5 -9 672.90 -52.7 -52.6 -52.8 70 -99 SPO 1997 04 29 10 18 358 7.5 -9 672.90 -52.7 -52.6 -52.8 70 -99 SPO 1997 04 29 10 19 357 7.4 -9 672.90 -52.8 -52.6 -52.8 72 -99 SPO 1997 04 29 10 20 357 7.5 -9 672.90 -52.8 -52.6 -52.8 72 -99 SPO 1997 04 29 10 21 357 7.4 -9 672.90 -52.8 -52.6 -52.9 72 -99 SPO 1997 04 29 10 22 357 8.3 -9 672.90 -52.8 -52.6 -52.8 72 -99 SPO 1997 04 29 10 23 357 8.2 -9 672.90 -52.8 -52.6 -52.8 71 -99 SPO 1997 04 29 10 24 356 7.9 -9 672.90 -52.8 -52.6 -52.8 70 -99 SPO 1997 04 29 10 25 357 8.1 -9 672.90 -52.8 -52.6 -52.9 70 -99 SPO 1997 04 29 10 26 357 7.8 -9 672.90 -52.8 -52.7 -52.9 70 -99 SPO 1997 04 29 10 27 355 7.9 -9 672.90 -52.8 -52.7 -52.9 70 -99 SPO 1997 04 29 10 28 355 7.9 -9 672.90 -52.8 -52.7 -53.0 70 -99 SPO 1997 04 29 10 29 355 7.9 -9 672.90 -52.9 -52.8 -53.0 72 -99 SPO 1997 04 29 10 30 355 7.8 -9 672.90 -52.9 -52.8 -53.0 72 -99 SPO 1997 04 29 10 31 355 7.9 -9 673.00 -53.0 -52.8 -53.1 73 -99 SPO 1997 04 29 10 32 355 7.8 -9 673.00 -53.0 -52.8 -53.1 73 -99 SPO 1997 04 29 10 33 356 7.4 -9 673.00 -53.0 -52.8 -53.1 73 -99 SPO 1997 04 29 10 34 356 7.7 -9 673.00 -53.0 -52.8 -53.1 73 -99 SPO 1997 04 29 10 35 356 7.6 -9 673.00 -53.0 -52.8 -53.2 72 -99 SPO 1997 04 29 10 36 356 7.6 -9 673.00 -53.1 -52.8 -53.2 73 -99 SPO 1997 04 29 10 37 357 7.7 -9 673.00 -53.1 -52.8 -53.2 71 -99 SPO 1997 04 29 10 38 356 7.7 -9 673.00 -53.1 -52.8 -53.2 71 -99 SPO 1997 04 29 10 39 356 7.4 -9 673.10 -53.2 -52.9 -53.2 71 -99 SPO 1997 04 29 10 40 356 7.6 -9 673.10 -53.2 -52.9 -53.3 71 -99 SPO 1997 04 29 10 41 355 7.4 -9 673.10 -53.2 -53.0 -53.3 70 -99 SPO 1997 04 29 10 42 355 7.5 -9 673.20 -53.2 -53.0 -53.3 72 -99 SPO 1997 04 29 10 43 354 7.6 -9 673.20 -53.2 -53.0 -53.3 72 -99 SPO 1997 04 29 10 44 356 7.6 -9 673.20 -53.2 -53.0 -53.3 72 -99 SPO 1997 04 29 10 45 355 7.5 -9 673.20 -53.3 -53.1 -53.4 73 -99 SPO 1997 04 29 10 46 355 8.0 -9 673.20 -53.3 -53.1 -53.4 73 -99 SPO 1997 04 29 10 47 355 7.7 -9 673.20 -53.3 -53.1 -53.4 72 -99 SPO 1997 04 29 10 48 355 7.4 -9 673.20 -53.3 -53.1 -53.4 72 -99 SPO 1997 04 29 10 49 354 7.6 -9 673.30 -53.4 -53.1 -53.5 72 -99 SPO 1997 04 29 10 50 355 7.8 -9 673.30 -53.4 -53.1 -53.5 71 -99 SPO 1997 04 29 10 51 354 7.5 -9 673.30 -53.4 -53.1 -53.5 71 -99 SPO 1997 04 29 10 52 354 7.1 -9 673.30 -53.4 -53.1 -53.5 71 -99 SPO 1997 04 29 10 53 354 7.0 -9 673.30 -53.4 -53.1 -53.5 71 -99 SPO 1997 04 29 10 54 355 7.2 -9 673.30 -53.5 -53.2 -53.5 73 -99 SPO 1997 04 29 10 55 355 7.2 -9 673.30 -53.5 -53.2 -53.6 73 -99 SPO 1997 04 29 10 56 356 6.9 -9 673.30 -53.5 -53.2 -53.6 73 -99 SPO 1997 04 29 10 57 356 7.3 -9 673.30 -53.5 -53.2 -53.6 72 -99 SPO 1997 04 29 10 58 356 7.3 -9 673.30 -53.5 -53.2 -53.6 71 -99 SPO 1997 04 29 10 59 355 7.5 -9 673.30 -53.5 -53.3 -53.6 71 -99 SPO 1997 04 29 11 00 354 7.3 -9 673.30 -53.6 -53.3 -53.7 71 0 SPO 1997 04 29 11 01 355 7.4 -9 673.30 -53.6 -53.3 -53.7 71 -99 SPO 1997 04 29 11 02 355 7.4 -9 673.30 -53.6 -53.3 -53.7 70 -99 SPO 1997 04 29 11 03 357 7.2 -9 673.30 -53.6 -53.4 -53.7 70 -99 SPO 1997 04 29 11 04 356 7.3 -9 673.30 -53.7 -53.4 -53.8 71 -99 SPO 1997 04 29 11 05 356 7.3 -9 673.30 -53.7 -53.3 -53.8 71 -99 SPO 1997 04 29 11 06 356 7.4 -9 673.40 -53.7 -53.3 -53.8 71 -99 SPO 1997 04 29 11 07 357 7.1 -9 673.40 -53.8 -53.4 -53.8 72 -99 SPO 1997 04 29 11 08 356 7.3 -9 673.30 -53.8 -53.4 -53.9 72 -99 SPO 1997 04 29 11 09 356 7.1 -9 673.30 -53.8 -53.4 -53.9 71 -99 SPO 1997 04 29 11 10 355 7.3 -9 673.40 -53.8 -53.4 -53.9 71 -99 SPO 1997 04 29 11 11 356 7.0 -9 673.40 -53.8 -53.4 -53.9 71 -99 SPO 1997 04 29 11 12 357 7.1 -9 673.40 -53.8 -53.4 -54.0 70 -99 SPO 1997 04 29 11 13 356 6.9 -9 673.40 -53.9 -53.4 -54.0 71 -99 SPO 1997 04 29 11 14 357 6.8 -9 673.40 -53.9 -53.4 -54.0 69 -99 SPO 1997 04 29 11 15 356 6.5 -9 673.40 -54.0 -53.5 -54.1 70 -99 SPO 1997 04 29 11 16 357 6.6 -9 673.40 -54.0 -53.6 -54.1 70 -99 SPO 1997 04 29 11 17 357 6.4 -9 673.50 -54.1 -53.6 -54.2 71 -99 SPO 1997 04 29 11 18 357 6.6 -9 673.50 -54.1 -53.6 -54.2 71 -99 SPO 1997 04 29 11 19 358 6.5 -9 673.50 -54.1 -53.6 -54.2 71 -99 SPO 1997 04 29 11 20 358 6.6 -9 673.50 -54.1 -53.6 -54.2 71 -99 SPO 1997 04 29 11 21 359 6.7 -9 673.50 -54.1 -53.6 -54.2 72 -99 SPO 1997 04 29 11 22 359 6.7 -9 673.50 -54.2 -53.6 -54.2 72 -99 SPO 1997 04 29 11 23 0 6.8 -9 673.50 -54.1 -53.6 -54.2 71 -99 SPO 1997 04 29 11 24 1 7.0 -9 673.50 -54.1 -53.6 -54.1 70 -99 SPO 1997 04 29 11 25 0 7.0 -9 673.60 -54.0 -53.6 -54.1 68 -99 SPO 1997 04 29 11 26 1 6.9 -9 673.60 -54.0 -53.6 -54.2 68 -99 SPO 1997 04 29 11 27 1 7.0 -9 673.60 -54.1 -53.6 -54.2 69 -99 SPO 1997 04 29 11 28 2 6.9 -9 673.60 -54.1 -53.6 -54.1 69 -99 SPO 1997 04 29 11 29 2 6.7 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 30 2 7.0 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 31 3 7.1 -9 673.60 -54.1 -53.5 -54.1 70 -99 SPO 1997 04 29 11 32 2 6.8 -9 673.60 -54.0 -53.5 -54.1 70 -99 SPO 1997 04 29 11 33 2 7.2 -9 673.60 -54.1 -53.6 -54.1 71 -99 SPO 1997 04 29 11 34 1 7.1 -9 673.70 -54.0 -53.6 -54.1 69 -99 SPO 1997 04 29 11 35 1 7.1 -9 673.70 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 36 1 7.2 -9 673.70 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 37 2 7.4 -9 673.60 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 38 1 7.3 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 39 1 7.4 -9 673.60 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 40 1 7.4 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 41 1 7.6 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 42 1 7.5 -9 673.60 -54.2 -53.5 -54.2 71 -99 SPO 1997 04 29 11 43 1 7.8 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 44 1 7.7 -9 673.60 -54.1 -53.5 -54.2 70 -99 SPO 1997 04 29 11 45 1 7.9 -9 673.70 -54.1 -53.4 -54.2 70 -99 SPO 1997 04 29 11 46 0 7.9 -9 673.70 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 47 1 7.8 -9 673.70 -54.1 -53.5 -54.2 69 -99 SPO 1997 04 29 11 48 360 8.0 -9 673.70 -54.1 -53.5 -54.2 68 -99 SPO 1997 04 29 11 49 360 7.7 -9 673.70 -54.2 -53.5 -54.3 69 -99 SPO 1997 04 29 11 50 359 7.8 -9 673.70 -54.2 -53.6 -54.3 69 -99 SPO 1997 04 29 11 51 360 7.6 -9 673.80 -54.2 -53.6 -54.3 69 -99 SPO 1997 04 29 11 52 0 7.7 -9 673.70 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 11 53 1 7.6 -9 673.70 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 11 54 0 7.8 -9 673.70 -54.3 -53.6 -54.3 71 -99 SPO 1997 04 29 11 55 360 7.8 -9 673.80 -54.3 -53.6 -54.4 71 -99 SPO 1997 04 29 11 56 359 7.9 -9 673.80 -54.3 -53.6 -54.3 71 -99 SPO 1997 04 29 11 57 359 7.8 -9 673.80 -54.2 -53.6 -54.4 69 -99 SPO 1997 04 29 11 58 359 7.7 -9 673.90 -54.3 -53.6 -54.4 70 -99 SPO 1997 04 29 11 59 359 7.8 -9 673.90 -54.3 -53.6 -54.4 70 -99 SPO 1997 04 29 12 00 359 7.6 -9 673.90 -54.4 -53.6 -54.4 70 0 SPO 1997 04 29 12 01 358 7.6 -9 674.00 -54.4 -53.6 -54.4 70 -99 SPO 1997 04 29 12 02 358 7.6 -9 674.00 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 12 03 359 7.4 -9 674.00 -54.4 -53.6 -54.5 69 -99 SPO 1997 04 29 12 04 359 7.6 -9 674.00 -54.5 -53.6 -54.6 70 -99 SPO 1997 04 29 12 05 358 7.7 -9 674.00 -54.5 -53.6 -54.5 71 -99 SPO 1997 04 29 12 06 359 7.6 -9 674.00 -54.5 -53.7 -54.6 71 -99 SPO 1997 04 29 12 07 359 7.7 -9 674.00 -54.5 -53.7 -54.6 71 -99 SPO 1997 04 29 12 08 359 7.6 -9 674.00 -54.6 -53.7 -54.6 71 -99 SPO 1997 04 29 12 09 357 7.5 -9 674.10 -54.6 -53.7 -54.7 71 -99 SPO 1997 04 29 12 10 357 7.4 -9 674.10 -54.6 -53.7 -54.7 70 -99 SPO 1997 04 29 12 11 358 7.3 -9 674.10 -54.6 -53.7 -54.7 70 -99 SPO 1997 04 29 12 12 359 7.2 -9 674.10 -54.7 -53.7 -54.7 70 -99 SPO 1997 04 29 12 13 360 7.2 -9 674.10 -54.7 -53.7 -54.8 71 -99 SPO 1997 04 29 12 14 359 7.2 -9 674.10 -54.7 -53.7 -54.8 71 -99 SPO 1997 04 29 12 15 360 7.3 -9 674.10 -54.7 -53.7 -54.7 70 -99 SPO 1997 04 29 12 16 0 7.3 -9 674.10 -54.7 -53.7 -54.8 70 -99 SPO 1997 04 29 12 17 0 7.2 -9 674.10 -54.8 -53.7 -54.8 71 -99 SPO 1997 04 29 12 18 360 7.4 -9 674.20 -54.8 -53.7 -54.8 71 -99 SPO 1997 04 29 12 19 359 7.2 -9 674.20 -54.8 -53.7 -54.8 71 -99 SPO 1997 04 29 12 20 360 7.2 -9 674.20 -54.8 -53.7 -54.8 70 -99 SPO 1997 04 29 12 21 359 7.3 -9 674.30 -54.8 -53.7 -54.8 70 -99 SPO 1997 04 29 12 22 360 7.3 -9 674.30 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 23 360 7.4 -9 674.30 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 24 1 7.5 -9 674.20 -54.8 -53.8 -54.9 69 -99 SPO 1997 04 29 12 25 2 7.4 -9 674.20 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 26 2 7.5 -9 674.20 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 27 3 7.6 -9 674.20 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 28 3 7.6 -9 674.20 -54.8 -53.8 -54.9 71 -99 SPO 1997 04 29 12 29 3 7.7 -9 674.30 -54.8 -53.8 -54.9 71 -99 SPO 1997 04 29 12 30 3 7.7 -9 674.30 -54.9 -53.8 -54.9 71 -99 SPO 1997 04 29 12 31 3 7.7 -9 674.30 -54.9 -53.8 -55.0 71 -99 SPO 1997 04 29 12 32 3 7.8 -9 674.30 -54.9 -53.8 -54.9 70 -99 SPO 1997 04 29 12 33 3 7.7 -9 674.30 -54.9 -53.8 -54.9 70 -99 SPO 1997 04 29 12 34 3 7.9 -9 674.30 -54.9 -53.8 -54.9 70 -99 SPO 1997 04 29 12 35 1 7.9 -9 674.30 -54.9 -53.8 -54.9 70 -99 SPO 1997 04 29 12 36 0 7.7 -9 674.30 -54.8 -53.8 -54.9 70 -99 SPO 1997 04 29 12 37 0 7.8 -9 674.30 -54.8 -53.7 -54.9 70 -99 SPO 1997 04 29 12 38 0 7.6 -9 674.30 -54.9 -53.8 -54.9 71 -99 SPO 1997 04 29 12 39 360 7.6 -9 674.30 -54.9 -53.8 -54.9 71 -99 SPO 1997 04 29 12 40 359 7.7 -9 674.30 -54.8 -53.8 -54.9 71 -99 SPO 1997 04 29 12 41 358 7.6 -9 674.30 -54.8 -53.9 -54.8 71 -99 SPO 1997 04 29 12 42 359 7.6 -9 674.30 -54.8 -53.9 -54.9 71 -99 SPO 1997 04 29 12 43 359 7.7 -9 674.30 -54.8 -53.9 -54.8 71 -99 SPO 1997 04 29 12 44 359 7.7 -9 674.30 -54.8 -53.9 -54.8 71 -99 SPO 1997 04 29 12 45 360 7.6 -9 674.30 -54.8 -53.9 -54.8 70 -99 SPO 1997 04 29 12 46 359 7.7 -9 674.30 -54.7 -53.9 -54.8 69 -99 SPO 1997 04 29 12 47 359 7.7 -9 674.40 -54.7 -53.9 -54.8 69 -99 SPO 1997 04 29 12 48 360 7.7 -9 674.30 -54.7 -53.9 -54.8 70 -99 SPO 1997 04 29 12 49 0 7.8 -9 674.30 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 12 50 359 8.0 -9 674.40 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 12 51 359 8.1 -9 674.40 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 12 52 0 8.0 -9 674.30 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 12 53 1 8.2 -9 674.30 -54.7 -53.8 -54.7 71 -99 SPO 1997 04 29 12 54 2 8.2 -9 674.30 -54.7 -53.8 -54.7 71 -99 SPO 1997 04 29 12 55 1 8.5 -9 674.30 -54.7 -53.8 -54.7 71 -99 SPO 1997 04 29 12 56 1 8.4 -9 674.30 -54.7 -53.8 -54.7 71 -99 SPO 1997 04 29 12 57 1 8.6 -9 674.30 -54.6 -53.8 -54.7 71 -99 SPO 1997 04 29 12 58 1 8.4 -9 674.30 -54.6 -53.8 -54.6 70 -99 SPO 1997 04 29 12 59 1 8.6 -9 674.30 -54.6 -53.7 -54.7 71 -99 SPO 1997 04 29 13 00 1 8.6 -9 674.30 -54.6 -53.7 -54.6 71 0 SPO 1997 04 29 13 01 1 8.5 -9 674.30 -54.6 -53.7 -54.6 71 -99 SPO 1997 04 29 13 02 1 8.8 -9 674.20 -54.5 -53.7 -54.6 71 -99 SPO 1997 04 29 13 03 2 8.8 -9 674.20 -54.5 -53.7 -54.5 72 -99 SPO 1997 04 29 13 04 1 9.0 -9 674.20 -54.5 -53.6 -54.5 71 -99 SPO 1997 04 29 13 05 1 8.8 -9 674.30 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 13 06 359 8.9 -9 674.30 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 13 07 358 8.9 -9 674.30 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 13 08 358 8.9 -9 674.30 -54.4 -53.5 -54.5 70 -99 SPO 1997 04 29 13 09 359 8.9 -9 674.30 -54.4 -53.5 -54.4 70 -99 SPO 1997 04 29 13 10 360 8.9 -9 674.30 -54.4 -53.5 -54.4 70 -99 SPO 1997 04 29 13 11 359 8.8 -9 674.40 -54.4 -53.6 -54.4 70 -99 SPO 1997 04 29 13 12 358 9.0 -9 674.40 -54.4 -53.7 -54.5 71 -99 SPO 1997 04 29 13 13 0 9.0 -9 674.40 -54.4 -53.7 -54.4 72 -99 SPO 1997 04 29 13 14 359 8.9 -9 674.40 -54.4 -53.7 -54.5 72 -99 SPO 1997 04 29 13 15 360 8.5 -9 674.40 -54.4 -53.7 -54.4 72 -99 SPO 1997 04 29 13 16 1 8.7 -9 674.40 -54.4 -53.7 -54.4 72 -99 SPO 1997 04 29 13 17 360 8.8 -9 674.40 -54.3 -53.6 -54.3 71 -99 SPO 1997 04 29 13 18 0 8.3 -9 674.40 -54.3 -53.6 -54.3 71 -99 SPO 1997 04 29 13 19 1 8.3 -9 674.40 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 13 20 2 8.7 -9 674.40 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 13 21 2 8.6 -9 674.40 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 13 22 3 8.2 -9 674.40 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 13 23 3 8.5 -9 674.40 -54.2 -53.6 -54.3 70 -99 SPO 1997 04 29 13 24 3 8.5 -9 674.40 -54.2 -53.5 -54.3 70 -99 SPO 1997 04 29 13 25 3 8.5 -9 674.40 -54.3 -53.5 -54.4 72 -99 SPO 1997 04 29 13 26 3 8.4 -9 674.40 -54.3 -53.5 -54.4 72 -99 SPO 1997 04 29 13 27 4 8.5 -9 674.40 -54.4 -53.6 -54.5 72 -99 SPO 1997 04 29 13 28 4 8.3 -9 674.40 -54.4 -53.6 -54.6 72 -99 SPO 1997 04 29 13 29 3 8.2 -9 674.40 -54.5 -53.7 -54.6 72 -99 SPO 1997 04 29 13 30 3 8.3 -9 674.40 -54.5 -53.7 -54.6 72 -99 SPO 1997 04 29 13 31 2 8.2 -9 674.40 -54.5 -53.7 -54.6 72 -99 SPO 1997 04 29 13 32 3 8.0 -9 674.50 -54.6 -53.8 -54.7 71 -99 SPO 1997 04 29 13 33 4 8.2 -9 674.50 -54.6 -53.8 -54.7 71 -99 SPO 1997 04 29 13 34 2 8.0 -9 674.50 -54.6 -53.8 -54.7 71 -99 SPO 1997 04 29 13 35 2 8.0 -9 674.50 -54.7 -53.8 -54.7 73 -99 SPO 1997 04 29 13 36 2 7.9 -9 674.50 -54.6 -53.8 -54.7 72 -99 SPO 1997 04 29 13 37 1 7.7 -9 674.50 -54.6 -53.8 -54.8 72 -99 SPO 1997 04 29 13 38 1 7.7 -9 674.50 -54.7 -53.8 -54.8 73 -99 SPO 1997 04 29 13 39 1 7.8 -9 674.50 -54.7 -53.8 -54.7 73 -99 SPO 1997 04 29 13 40 1 7.9 -9 674.50 -54.7 -53.7 -54.7 72 -99 SPO 1997 04 29 13 41 2 7.5 -9 674.60 -54.7 -53.7 -54.7 72 -99 SPO 1997 04 29 13 42 2 7.4 -9 674.60 -54.7 -53.7 -54.7 71 -99 SPO 1997 04 29 13 43 1 7.3 -9 674.60 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 13 44 2 7.2 -9 674.60 -54.7 -53.8 -54.7 71 -99 SPO 1997 04 29 13 45 2 7.0 -9 674.60 -54.7 -53.8 -54.8 71 -99 SPO 1997 04 29 13 46 2 6.9 -9 674.70 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 13 47 2 6.8 -9 674.70 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 13 48 3 6.8 -9 674.70 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 13 49 5 6.5 -9 674.70 -54.8 -53.9 -54.9 73 -99 SPO 1997 04 29 13 50 6 6.6 -9 674.70 -54.8 -54.0 -54.8 72 -99 SPO 1997 04 29 13 51 6 6.5 -9 674.70 -54.8 -54.0 -55.0 72 -99 SPO 1997 04 29 13 52 6 6.3 -9 674.70 -54.9 -54.0 -55.0 72 -99 SPO 1997 04 29 13 53 5 6.4 -9 674.70 -54.9 -54.0 -55.0 72 -99 SPO 1997 04 29 13 54 5 6.3 -9 674.70 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 13 55 5 6.3 -9 674.80 -55.0 -54.0 -55.0 71 -99 SPO 1997 04 29 13 56 5 6.5 -9 674.70 -55.0 -54.1 -55.1 72 -99 SPO 1997 04 29 13 57 6 6.8 -9 674.70 -55.0 -54.0 -55.0 72 -99 SPO 1997 04 29 13 58 6 6.9 -9 674.70 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 13 59 5 7.0 -9 674.70 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 14 00 4 7.3 -9 674.70 -55.0 -54.0 -55.0 71 0 SPO 1997 04 29 14 01 5 7.3 -9 674.60 -55.0 -54.0 -55.0 72 -99 SPO 1997 04 29 14 02 5 7.5 -9 674.60 -55.0 -54.0 -55.0 72 -99 SPO 1997 04 29 14 03 6 7.7 -9 674.60 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 14 04 5 7.6 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 05 4 7.5 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 06 3 7.6 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 07 3 7.7 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 08 2 7.8 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 09 2 8.0 -9 674.60 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 10 4 8.1 -9 674.50 -54.9 -53.9 -55.0 71 -99 SPO 1997 04 29 14 11 5 8.2 -9 674.50 -54.9 -53.8 -55.0 71 -99 SPO 1997 04 29 14 12 5 8.4 -9 674.50 -54.9 -53.8 -55.0 71 -99 SPO 1997 04 29 14 13 5 8.7 -9 674.50 -54.9 -53.8 -54.9 71 -99 SPO 1997 04 29 14 14 5 8.6 -9 674.40 -54.8 -53.8 -54.8 70 -99 SPO 1997 04 29 14 15 4 8.5 -9 674.40 -54.8 -53.7 -54.9 70 -99 SPO 1997 04 29 14 16 5 9.1 -9 674.40 -54.8 -53.7 -54.8 69 -99 SPO 1997 04 29 14 17 4 9.6 -9 674.40 -54.7 -53.7 -54.7 68 -99 SPO 1997 04 29 14 18 4 9.7 -9 674.30 -54.6 -53.7 -54.6 68 -99 SPO 1997 04 29 14 19 4 9.5 -9 674.30 -54.6 -53.7 -54.6 68 -99 SPO 1997 04 29 14 20 5 9.4 -9 674.30 -54.6 -53.7 -54.6 69 -99 SPO 1997 04 29 14 21 4 9.4 -9 674.30 -54.6 -53.7 -54.6 70 -99 SPO 1997 04 29 14 22 4 9.4 -9 674.30 -54.6 -53.6 -54.6 71 -99 SPO 1997 04 29 14 23 3 9.2 -9 674.30 -54.5 -53.6 -54.6 71 -99 SPO 1997 04 29 14 24 2 9.4 -9 674.40 -54.5 -53.6 -54.6 72 -99 SPO 1997 04 29 14 25 2 9.6 -9 674.30 -54.5 -53.6 -54.5 71 -99 SPO 1997 04 29 14 26 2 9.3 -9 674.40 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 14 27 2 9.2 -9 674.40 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 14 28 0 9.0 -9 674.40 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 14 29 360 8.9 -9 674.50 -54.4 -53.6 -54.5 70 -99 SPO 1997 04 29 14 30 1 9.1 -9 674.50 -54.4 -53.6 -54.6 70 -99 SPO 1997 04 29 14 31 1 9.1 -9 674.50 -54.5 -53.6 -54.5 72 -99 SPO 1997 04 29 14 32 2 9.2 -9 674.50 -54.5 -53.6 -54.5 72 -99 SPO 1997 04 29 14 33 1 9.1 -9 674.50 -54.5 -53.7 -54.5 72 -99 SPO 1997 04 29 14 34 2 9.1 -9 674.60 -54.5 -53.7 -54.6 72 -99 SPO 1997 04 29 14 35 2 8.7 -9 674.60 -54.5 -53.8 -54.6 72 -99 SPO 1997 04 29 14 36 1 8.9 -9 674.60 -54.5 -53.8 -54.6 73 -99 SPO 1997 04 29 14 37 360 8.8 -9 674.70 -54.5 -53.8 -54.6 72 -99 SPO 1997 04 29 14 38 1 8.4 -9 674.70 -54.5 -53.8 -54.6 72 -99 SPO 1997 04 29 14 39 0 8.5 -9 674.70 -54.6 -53.9 -54.7 73 -99 SPO 1997 04 29 14 40 1 8.6 -9 674.70 -54.6 -53.9 -54.7 72 -99 SPO 1997 04 29 14 41 2 8.7 -9 674.70 -54.6 -53.9 -54.7 72 -99 SPO 1997 04 29 14 42 2 8.5 -9 674.70 -54.6 -53.9 -54.7 72 -99 SPO 1997 04 29 14 43 2 8.7 -9 674.80 -54.6 -53.9 -54.7 72 -99 SPO 1997 04 29 14 44 2 8.3 -9 674.80 -54.6 -53.9 -54.7 72 -99 SPO 1997 04 29 14 45 2 8.2 -9 674.80 -54.6 -54.0 -54.8 73 -99 SPO 1997 04 29 14 46 1 7.9 -9 674.80 -54.7 -54.0 -54.8 73 -99 SPO 1997 04 29 14 47 1 7.9 -9 674.90 -54.7 -54.0 -54.7 73 -99 SPO 1997 04 29 14 48 0 8.1 -9 674.90 -54.6 -54.0 -54.7 72 -99 SPO 1997 04 29 14 49 1 7.9 -9 674.90 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 14 50 360 8.0 -9 674.90 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 14 51 0 8.0 -9 674.90 -54.6 -54.0 -54.6 71 -99 SPO 1997 04 29 14 52 0 7.8 -9 674.90 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 14 53 359 7.4 -9 675.00 -54.6 -54.1 -54.6 71 -99 SPO 1997 04 29 14 54 360 7.7 -9 675.00 -54.6 -54.1 -54.6 71 -99 SPO 1997 04 29 14 55 360 7.8 -9 675.00 -54.5 -54.1 -54.6 72 -99 SPO 1997 04 29 14 56 0 7.7 -9 675.00 -54.6 -54.1 -54.6 73 -99 SPO 1997 04 29 14 57 2 7.6 -9 675.00 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 14 58 1 7.6 -9 675.00 -54.5 -54.0 -54.6 73 -99 SPO 1997 04 29 14 59 0 7.7 -9 675.00 -54.5 -54.0 -54.6 73 -99 SPO 1997 04 29 15 00 1 7.8 -9 675.00 -54.5 -54.0 -54.6 72 0 SPO 1997 04 29 15 01 1 7.7 -9 675.00 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 15 02 0 8.0 -9 675.00 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 15 03 0 7.8 -9 675.00 -54.5 -54.0 -54.6 71 -99 SPO 1997 04 29 15 04 1 7.7 -9 675.00 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 05 0 8.1 -9 675.00 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 06 1 8.1 -9 675.00 -54.6 -54.0 -54.6 71 -99 SPO 1997 04 29 15 07 1 7.8 -9 675.00 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 08 0 7.8 -9 675.00 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 15 09 1 8.1 -9 675.00 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 15 10 1 8.1 -9 675.00 -54.6 -54.0 -54.7 72 -99 SPO 1997 04 29 15 11 0 8.1 -9 675.00 -54.6 -54.0 -54.7 72 -99 SPO 1997 04 29 15 12 0 8.1 -9 675.00 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 13 360 8.2 -9 675.10 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 14 359 8.2 -9 675.10 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 15 358 8.0 -9 675.10 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 16 359 8.2 -9 675.10 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 17 360 8.1 -9 675.00 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 15 18 359 8.2 -9 675.00 -54.6 -53.9 -54.7 71 -99 SPO 1997 04 29 15 19 358 8.5 -9 675.00 -54.6 -53.9 -54.6 71 -99 SPO 1997 04 29 15 20 358 8.7 -9 675.00 -54.6 -53.8 -54.6 71 -99 SPO 1997 04 29 15 21 358 8.8 -9 675.00 -54.5 -53.8 -54.6 72 -99 SPO 1997 04 29 15 22 357 8.6 -9 675.00 -54.5 -53.8 -54.5 72 -99 SPO 1997 04 29 15 23 357 8.9 -9 675.00 -54.5 -53.8 -54.4 71 -99 SPO 1997 04 29 15 24 357 8.9 -9 675.00 -54.4 -53.8 -54.4 70 -99 SPO 1997 04 29 15 25 357 8.9 -9 675.00 -54.4 -53.8 -54.4 70 -99 SPO 1997 04 29 15 26 357 8.8 -9 675.00 -54.4 -53.8 -54.4 70 -99 SPO 1997 04 29 15 27 358 8.9 -9 675.00 -54.3 -53.8 -54.4 70 -99 SPO 1997 04 29 15 28 358 8.8 -9 675.00 -54.3 -53.8 -54.4 71 -99 SPO 1997 04 29 15 29 358 9.0 -9 675.00 -54.3 -53.8 -54.4 71 -99 SPO 1997 04 29 15 30 357 9.1 -9 675.00 -54.3 -53.8 -54.4 71 -99 SPO 1997 04 29 15 31 358 8.9 -9 675.00 -54.3 -53.8 -54.3 72 -99 SPO 1997 04 29 15 32 357 9.1 -9 675.00 -54.2 -53.8 -54.3 71 -99 SPO 1997 04 29 15 33 357 9.1 -9 675.00 -54.2 -53.7 -54.3 71 -99 SPO 1997 04 29 15 34 358 9.2 -9 675.00 -54.2 -53.7 -54.3 71 -99 SPO 1997 04 29 15 35 357 9.1 -9 675.00 -54.2 -53.7 -54.2 71 -99 SPO 1997 04 29 15 36 358 9.2 -9 675.00 -54.2 -53.6 -54.2 70 -99 SPO 1997 04 29 15 37 359 9.1 -9 675.00 -54.2 -53.6 -54.2 70 -99 SPO 1997 04 29 15 38 359 9.2 -9 675.00 -54.2 -53.6 -54.2 69 -99 SPO 1997 04 29 15 39 358 9.1 -9 675.00 -54.2 -53.6 -54.2 69 -99 SPO 1997 04 29 15 40 357 9.2 -9 675.00 -54.2 -53.6 -54.2 70 -99 SPO 1997 04 29 15 41 0 9.2 -9 675.00 -54.2 -53.7 -54.3 70 -99 SPO 1997 04 29 15 42 359 9.4 -9 675.00 -54.2 -53.7 -54.2 72 -99 SPO 1997 04 29 15 43 356 9.1 -9 675.00 -54.2 -53.8 -54.3 72 -99 SPO 1997 04 29 15 44 358 9.1 -9 675.00 -54.2 -53.8 -54.4 72 -99 SPO 1997 04 29 15 45 358 9.3 -9 675.00 -54.2 -53.8 -54.4 72 -99 SPO 1997 04 29 15 46 359 9.0 -9 675.00 -54.2 -53.8 -54.3 72 -99 SPO 1997 04 29 15 47 359 9.1 -9 675.00 -54.2 -53.8 -54.3 72 -99 SPO 1997 04 29 15 48 358 9.2 -9 675.00 -54.2 -53.8 -54.4 72 -99 SPO 1997 04 29 15 49 358 9.3 -9 675.00 -54.3 -53.8 -54.4 72 -99 SPO 1997 04 29 15 50 357 9.0 -9 675.00 -54.2 -53.8 -54.3 72 -99 SPO 1997 04 29 15 51 357 9.3 -9 675.10 -54.2 -53.8 -54.3 72 -99 SPO 1997 04 29 15 52 358 9.1 -9 675.10 -54.2 -53.7 -54.3 72 -99 SPO 1997 04 29 15 53 356 8.8 -9 675.10 -54.2 -53.7 -54.4 72 -99 SPO 1997 04 29 15 54 357 9.2 -9 675.10 -54.3 -53.7 -54.3 73 -99 SPO 1997 04 29 15 55 356 9.3 -9 675.10 -54.3 -53.7 -54.3 73 -99 SPO 1997 04 29 15 56 356 9.1 -9 675.10 -54.3 -53.7 -54.4 73 -99 SPO 1997 04 29 15 57 356 8.9 -9 675.10 -54.3 -53.8 -54.4 73 -99 SPO 1997 04 29 15 58 356 9.2 -9 675.10 -54.4 -53.9 -54.5 73 -99 SPO 1997 04 29 15 59 356 8.7 -9 675.10 -54.4 -54.0 -54.5 73 -99 SPO 1997 04 29 16 00 357 8.8 -9 675.10 -54.4 -54.0 -54.6 72 0 SPO 1997 04 29 16 01 356 8.9 -9 675.10 -54.4 -54.0 -54.6 72 -99 SPO 1997 04 29 16 02 357 8.9 -9 675.10 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 16 03 358 9.2 -9 675.10 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 16 04 359 9.0 -9 675.00 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 16 05 359 8.8 -9 675.00 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 16 06 358 8.9 -9 675.00 -54.6 -54.0 -54.6 73 -99 SPO 1997 04 29 16 07 359 8.9 -9 675.00 -54.6 -54.0 -54.6 73 -99 SPO 1997 04 29 16 08 358 8.9 -9 675.10 -54.6 -54.0 -54.7 73 -99 SPO 1997 04 29 16 09 357 8.8 -9 675.10 -54.6 -54.0 -54.7 73 -99 SPO 1997 04 29 16 10 357 9.1 -9 675.10 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 16 11 358 9.0 -9 675.10 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 16 12 358 8.9 -9 675.10 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 16 13 358 9.0 -9 675.10 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 16 14 359 9.1 -9 675.10 -54.7 -54.0 -54.9 71 -99 SPO 1997 04 29 16 15 359 9.1 -9 675.10 -54.8 -54.1 -54.9 72 -99 SPO 1997 04 29 16 16 360 9.0 -9 675.10 -54.8 -54.1 -54.9 72 -99 SPO 1997 04 29 16 17 359 8.9 -9 675.10 -54.8 -54.0 -54.9 73 -99 SPO 1997 04 29 16 18 360 9.0 -9 675.10 -54.8 -54.0 -54.9 73 -99 SPO 1997 04 29 16 19 0 8.9 -9 675.10 -54.8 -54.0 -54.9 73 -99 SPO 1997 04 29 16 20 360 8.8 -9 675.10 -54.9 -54.0 -54.9 73 -99 SPO 1997 04 29 16 21 359 8.9 -9 675.10 -54.9 -54.0 -54.9 72 -99 SPO 1997 04 29 16 22 359 9.0 -9 675.10 -54.8 -54.0 -54.9 71 -99 SPO 1997 04 29 16 23 358 8.8 -9 675.20 -54.9 -54.0 -54.9 71 -99 SPO 1997 04 29 16 24 358 9.0 -9 675.20 -54.9 -54.0 -54.9 71 -99 SPO 1997 04 29 16 25 358 8.8 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 26 359 8.7 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 27 358 8.6 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 28 358 8.7 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 29 358 8.7 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 30 358 8.9 -9 675.20 -55.0 -54.0 -55.0 72 -99 SPO 1997 04 29 16 31 358 8.9 -9 675.20 -55.0 -54.0 -55.0 72 -99 SPO 1997 04 29 16 32 358 9.0 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 33 358 8.8 -9 675.20 -54.9 -54.0 -55.0 71 -99 SPO 1997 04 29 16 34 358 8.7 -9 675.30 -54.9 -54.0 -55.0 70 -99 SPO 1997 04 29 16 35 359 8.7 -9 675.30 -54.9 -54.0 -55.0 68 -99 SPO 1997 04 29 16 36 359 8.9 -9 675.30 -54.9 -54.0 -55.0 68 -99 SPO 1997 04 29 16 37 360 8.7 -9 675.30 -54.9 -54.0 -54.9 68 -99 SPO 1997 04 29 16 38 0 8.6 -9 675.30 -54.8 -53.9 -54.9 70 -99 SPO 1997 04 29 16 39 0 8.7 -9 675.30 -54.8 -53.9 -54.8 70 -99 SPO 1997 04 29 16 40 360 8.6 -9 675.30 -54.8 -54.0 -54.8 71 -99 SPO 1997 04 29 16 41 1 8.5 -9 675.40 -54.7 -54.0 -54.8 70 -99 SPO 1997 04 29 16 42 2 8.8 -9 675.40 -54.8 -54.0 -54.8 71 -99 SPO 1997 04 29 16 43 3 8.6 -9 675.30 -54.7 -53.9 -54.8 70 -99 SPO 1997 04 29 16 44 3 8.6 -9 675.30 -54.7 -54.0 -54.8 69 -99 SPO 1997 04 29 16 45 4 8.7 -9 675.30 -54.7 -54.0 -54.7 69 -99 SPO 1997 04 29 16 46 3 8.8 -9 675.30 -54.7 -54.0 -54.8 68 -99 SPO 1997 04 29 16 47 0 8.6 -9 675.40 -54.7 -54.0 -54.8 68 -99 SPO 1997 04 29 16 48 358 8.2 -9 675.40 -54.7 -54.2 -54.8 68 -99 SPO 1997 04 29 16 49 359 8.4 -9 675.40 -54.7 -54.2 -54.9 69 -99 SPO 1997 04 29 16 50 358 8.6 -9 675.40 -54.8 -54.2 -54.8 70 -99 SPO 1997 04 29 16 51 359 8.7 -9 675.40 -54.8 -54.2 -54.9 71 -99 SPO 1997 04 29 16 52 358 8.8 -9 675.40 -54.8 -54.2 -54.8 71 -99 SPO 1997 04 29 16 53 358 9.0 -9 675.40 -54.8 -54.2 -54.9 71 -99 SPO 1997 04 29 16 54 357 8.7 -9 675.40 -54.8 -54.3 -54.9 71 -99 SPO 1997 04 29 16 55 358 8.8 -9 675.40 -54.8 -54.3 -54.9 71 -99 SPO 1997 04 29 16 56 357 9.1 -9 675.40 -54.8 -54.3 -54.9 71 -99 SPO 1997 04 29 16 57 357 9.5 -9 675.40 -54.8 -54.3 -54.9 71 -99 SPO 1997 04 29 16 58 357 9.8 -9 675.40 -54.8 -54.2 -54.8 70 -99 SPO 1997 04 29 16 59 357 9.7 -9 675.40 -54.8 -54.2 -54.8 70 -99 SPO 1997 04 29 17 00 357 9.8 -9 675.40 -54.8 -54.2 -54.8 70 0 SPO 1997 04 29 17 01 357 9.8 -9 675.40 -54.8 -54.1 -54.8 71 -99 SPO 1997 04 29 17 02 356 9.7 -9 675.40 -54.8 -54.1 -54.8 71 -99 SPO 1997 04 29 17 03 357 9.7 -9 675.40 -54.8 -54.1 -54.8 71 -99 SPO 1997 04 29 17 04 357 10.0 -9 675.40 -54.7 -54.2 -54.8 70 -99 SPO 1997 04 29 17 05 357 9.9 -9 675.30 -54.7 -54.1 -54.8 71 -99 SPO 1997 04 29 17 06 357 10.2 -9 675.40 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 17 07 358 10.0 -9 675.30 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 17 08 358 10.1 -9 675.30 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 17 09 358 10.1 -9 675.30 -54.7 -54.2 -54.8 70 -99 SPO 1997 04 29 17 10 358 10.2 -9 675.30 -54.7 -54.2 -54.8 70 -99 SPO 1997 04 29 17 11 357 10.3 -9 675.30 -54.7 -54.2 -54.8 69 -99 SPO 1997 04 29 17 12 358 10.2 -9 675.30 -54.7 -54.1 -54.8 69 -99 SPO 1997 04 29 17 13 358 10.2 -9 675.30 -54.7 -54.1 -54.8 70 -99 SPO 1997 04 29 17 14 358 10.3 -9 675.40 -54.7 -54.1 -54.8 71 -99 SPO 1997 04 29 17 15 358 10.2 -9 675.40 -54.8 -54.1 -54.9 71 -99 SPO 1997 04 29 17 16 359 10.1 -9 675.40 -54.8 -54.0 -54.9 72 -99 SPO 1997 04 29 17 17 359 10.5 -9 675.40 -54.8 -54.0 -54.8 73 -99 SPO 1997 04 29 17 18 359 10.5 -9 675.40 -54.8 -53.8 -54.8 71 -99 SPO 1997 04 29 17 19 360 10.3 -9 675.40 -54.8 -53.8 -54.8 71 -99 SPO 1997 04 29 17 20 360 10.2 -9 675.40 -54.7 -53.8 -54.8 69 -99 SPO 1997 04 29 17 21 0 10.0 -9 675.40 -54.7 -53.8 -54.8 70 -99 SPO 1997 04 29 17 22 360 9.8 -9 675.50 -54.7 -53.9 -54.8 70 -99 SPO 1997 04 29 17 23 360 9.6 -9 675.50 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 24 359 9.5 -9 675.50 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 25 359 9.7 -9 675.50 -54.7 -54.1 -54.8 71 -99 SPO 1997 04 29 17 26 360 9.9 -9 675.50 -54.7 -54.1 -54.8 71 -99 SPO 1997 04 29 17 27 0 9.8 -9 675.50 -54.7 -54.0 -54.8 72 -99 SPO 1997 04 29 17 28 0 9.7 -9 675.50 -54.7 -54.0 -54.8 72 -99 SPO 1997 04 29 17 29 360 9.5 -9 675.50 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 30 359 9.1 -9 675.50 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 31 0 9.0 -9 675.50 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 32 1 9.3 -9 675.60 -54.7 -54.0 -54.8 71 -99 SPO 1997 04 29 17 33 2 9.3 -9 675.50 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 17 34 2 9.2 -9 675.50 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 17 35 2 8.9 -9 675.50 -54.7 -53.9 -54.8 71 -99 SPO 1997 04 29 17 36 3 8.9 -9 675.50 -54.7 -54.0 -54.8 70 -99 SPO 1997 04 29 17 37 3 8.6 -9 675.60 -54.7 -54.0 -54.7 71 -99 SPO 1997 04 29 17 38 6 9.0 -9 675.50 -54.6 -54.1 -54.6 71 -99 SPO 1997 04 29 17 39 4 8.8 -9 675.60 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 17 40 4 8.9 -9 675.50 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 17 41 5 8.7 -9 675.50 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 17 42 5 9.2 -9 675.50 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 17 43 4 9.1 -9 675.50 -54.6 -54.2 -54.7 70 -99 SPO 1997 04 29 17 44 4 9.3 -9 675.50 -54.6 -54.2 -54.7 70 -99 SPO 1997 04 29 17 45 4 8.9 -9 675.50 -54.6 -54.2 -54.7 70 -99 SPO 1997 04 29 17 46 3 9.3 -9 675.50 -54.6 -54.2 -54.7 70 -99 SPO 1997 04 29 17 47 3 9.3 -9 675.50 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 17 48 3 9.5 -9 675.50 -54.7 -54.2 -54.7 71 -99 SPO 1997 04 29 17 49 3 9.7 -9 675.50 -54.7 -54.1 -54.7 71 -99 SPO 1997 04 29 17 50 3 9.6 -9 675.50 -54.7 -54.0 -54.7 72 -99 SPO 1997 04 29 17 51 1 9.7 -9 675.50 -54.6 -54.0 -54.7 71 -99 SPO 1997 04 29 17 52 1 9.7 -9 675.50 -54.6 -54.0 -54.6 71 -99 SPO 1997 04 29 17 53 2 10.1 -9 675.50 -54.6 -54.0 -54.6 71 -99 SPO 1997 04 29 17 54 1 9.6 -9 675.50 -54.6 -54.1 -54.6 71 -99 SPO 1997 04 29 17 55 359 9.6 -9 675.60 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 17 56 359 9.5 -9 675.60 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 17 57 359 9.6 -9 675.60 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 17 58 358 9.6 -9 675.60 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 17 59 358 9.4 -9 675.70 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 00 358 9.6 -9 675.70 -54.6 -54.2 -54.7 72 0 SPO 1997 04 29 18 01 358 9.7 -9 675.60 -54.6 -54.1 -54.7 72 -99 SPO 1997 04 29 18 02 358 9.6 -9 675.70 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 03 357 9.5 -9 675.70 -54.6 -54.2 -54.7 73 -99 SPO 1997 04 29 18 04 358 9.5 -9 675.70 -54.6 -54.2 -54.8 72 -99 SPO 1997 04 29 18 05 359 9.1 -9 675.80 -54.7 -54.2 -54.7 73 -99 SPO 1997 04 29 18 06 359 9.2 -9 675.80 -54.7 -54.2 -54.7 72 -99 SPO 1997 04 29 18 07 360 9.2 -9 675.70 -54.7 -54.2 -54.8 72 -99 SPO 1997 04 29 18 08 358 8.7 -9 675.80 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 18 09 355 8.6 -9 675.80 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 10 354 8.1 -9 675.90 -54.7 -54.4 -54.8 72 -99 SPO 1997 04 29 18 11 355 8.4 -9 675.90 -54.7 -54.4 -54.8 73 -99 SPO 1997 04 29 18 12 356 8.6 -9 675.80 -54.7 -54.4 -54.8 73 -99 SPO 1997 04 29 18 13 357 8.5 -9 675.80 -54.7 -54.4 -54.8 74 -99 SPO 1997 04 29 18 14 357 9.0 -9 675.80 -54.7 -54.4 -54.8 74 -99 SPO 1997 04 29 18 15 359 9.3 -9 675.80 -54.7 -54.4 -54.8 74 -99 SPO 1997 04 29 18 16 358 9.5 -9 675.80 -54.7 -54.3 -54.8 73 -99 SPO 1997 04 29 18 17 358 9.2 -9 675.80 -54.7 -54.3 -54.8 73 -99 SPO 1997 04 29 18 18 358 9.3 -9 675.80 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 19 359 9.6 -9 675.80 -54.7 -54.3 -54.7 72 -99 SPO 1997 04 29 18 20 359 9.1 -9 675.80 -54.6 -54.3 -54.7 71 -99 SPO 1997 04 29 18 21 359 9.7 -9 675.80 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 22 359 9.5 -9 675.80 -54.6 -54.3 -54.7 71 -99 SPO 1997 04 29 18 23 359 9.7 -9 675.80 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 24 358 9.4 -9 675.80 -54.7 -54.3 -54.7 73 -99 SPO 1997 04 29 18 25 358 9.5 -9 675.90 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 26 359 9.6 -9 675.80 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 27 357 9.4 -9 675.90 -54.7 -54.4 -54.8 72 -99 SPO 1997 04 29 18 28 358 9.5 -9 675.90 -54.7 -54.4 -54.8 72 -99 SPO 1997 04 29 18 29 358 9.9 -9 675.80 -54.7 -54.4 -54.8 72 -99 SPO 1997 04 29 18 30 358 9.9 -9 675.80 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 31 358 9.6 -9 675.90 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 32 357 9.4 -9 675.90 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 18 33 359 9.2 -9 675.90 -54.7 -54.3 -54.8 73 -99 SPO 1997 04 29 18 34 358 9.2 -9 675.90 -54.7 -54.2 -54.8 73 -99 SPO 1997 04 29 18 35 359 9.4 -9 675.90 -54.7 -54.2 -54.8 73 -99 SPO 1997 04 29 18 36 359 9.6 -9 675.90 -54.7 -54.2 -54.7 72 -99 SPO 1997 04 29 18 37 359 9.4 -9 675.90 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 38 360 9.5 -9 675.90 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 39 359 9.5 -9 675.90 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 40 0 9.5 -9 675.90 -54.6 -54.2 -54.6 71 -99 SPO 1997 04 29 18 41 359 9.4 -9 675.90 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 18 42 0 9.4 -9 675.90 -54.6 -54.1 -54.7 71 -99 SPO 1997 04 29 18 43 0 9.7 -9 675.90 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 44 1 9.7 -9 675.90 -54.6 -54.2 -54.6 72 -99 SPO 1997 04 29 18 45 1 9.7 -9 675.90 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 46 359 9.5 -9 676.00 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 47 359 9.7 -9 676.00 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 48 360 9.8 -9 676.00 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 18 49 360 9.2 -9 676.00 -54.6 -54.2 -54.7 71 -99 SPO 1997 04 29 18 50 360 9.4 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 18 51 360 9.3 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 18 52 359 9.3 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 18 53 359 9.6 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 18 54 358 9.6 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 18 55 357 9.8 -9 676.00 -54.7 -54.3 -54.7 71 -99 SPO 1997 04 29 18 56 357 9.7 -9 676.00 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 18 57 358 10.0 -9 676.00 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 18 58 358 10.2 -9 676.00 -54.7 -54.2 -54.8 71 -99 SPO 1997 04 29 18 59 358 10.1 -9 676.00 -54.7 -54.3 -54.8 72 -99 SPO 1997 04 29 19 00 358 10.3 -9 676.00 -54.6 -54.3 -54.7 71 0 SPO 1997 04 29 19 01 358 10.0 -9 676.00 -54.6 -54.3 -54.7 71 -99 SPO 1997 04 29 19 02 358 10.2 -9 676.00 -54.6 -54.3 -54.8 71 -99 SPO 1997 04 29 19 03 359 10.2 -9 676.00 -54.6 -54.3 -54.8 71 -99 SPO 1997 04 29 19 04 359 10.2 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 19 05 359 10.2 -9 676.00 -54.7 -54.3 -54.8 71 -99 SPO 1997 04 29 19 06 359 10.5 -9 676.00 -54.6 -54.3 -54.7 71 -99 SPO 1997 04 29 19 07 359 10.6 -9 676.00 -54.6 -54.3 -54.6 71 -99 SPO 1997 04 29 19 08 359 10.4 -9 676.00 -54.6 -54.2 -54.7 72 -99 SPO 1997 04 29 19 09 0 10.1 -9 676.00 -54.6 -54.2 -54.7 73 -99 SPO 1997 04 29 19 10 360 10.0 -9 675.90 -54.6 -54.2 -54.7 73 -99 SPO 1997 04 29 19 11 359 10.6 -9 675.90 -54.6 -54.2 -54.6 73 -99 SPO 1997 04 29 19 12 359 10.6 -9 675.90 -54.6 -54.2 -54.6 73 -99 SPO 1997 04 29 19 13 359 10.5 -9 675.90 -54.6 -54.2 -54.6 72 -99 SPO 1997 04 29 19 14 359 10.8 -9 675.90 -54.5 -54.2 -54.6 72 -99 SPO 1997 04 29 19 15 357 10.8 -9 675.90 -54.5 -54.2 -54.6 71 -99 SPO 1997 04 29 19 16 357 10.8 -9 675.90 -54.5 -54.2 -54.6 71 -99 SPO 1997 04 29 19 17 357 10.8 -9 675.90 -54.5 -54.2 -54.6 72 -99 SPO 1997 04 29 19 18 357 10.8 -9 675.90 -54.6 -54.2 -54.6 73 -99 SPO 1997 04 29 19 19 357 11.2 -9 675.90 -54.5 -54.2 -54.6 72 -99 SPO 1997 04 29 19 20 356 10.8 -9 675.90 -54.5 -54.1 -54.6 72 -99 SPO 1997 04 29 19 21 356 10.7 -9 675.90 -54.5 -54.2 -54.6 73 -99 SPO 1997 04 29 19 22 357 10.9 -9 675.90 -54.5 -54.1 -54.6 73 -99 SPO 1997 04 29 19 23 357 10.7 -9 675.90 -54.5 -54.1 -54.6 73 -99 SPO 1997 04 29 19 24 358 10.8 -9 675.90 -54.5 -54.2 -54.7 73 -99 SPO 1997 04 29 19 25 357 10.8 -9 675.90 -54.6 -54.1 -54.7 73 -99 SPO 1997 04 29 19 26 356 10.7 -9 675.90 -54.6 -54.1 -54.6 73 -99 SPO 1997 04 29 19 27 357 11.0 -9 675.90 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 19 28 357 10.9 -9 675.90 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 19 29 358 11.0 -9 675.90 -54.5 -54.0 -54.6 72 -99 SPO 1997 04 29 19 30 357 11.0 -9 675.90 -54.5 -54.0 -54.5 72 -99 SPO 1997 04 29 19 31 358 10.8 -9 675.90 -54.4 -54.0 -54.5 72 -99 SPO 1997 04 29 19 32 358 10.7 -9 676.00 -54.4 -54.1 -54.6 72 -99 SPO 1997 04 29 19 33 358 10.9 -9 676.00 -54.4 -54.1 -54.6 72 -99 SPO 1997 04 29 19 34 359 11.0 -9 676.00 -54.4 -54.1 -54.6 72 -99 SPO 1997 04 29 19 35 358 11.0 -9 676.00 -54.4 -54.1 -54.5 72 -99 SPO 1997 04 29 19 36 358 10.4 -9 676.00 -54.4 -54.2 -54.6 72 -99 SPO 1997 04 29 19 37 359 10.8 -9 676.00 -54.5 -54.2 -54.6 72 -99 SPO 1997 04 29 19 38 360 10.5 -9 676.00 -54.5 -54.3 -54.6 72 -99 SPO 1997 04 29 19 39 0 10.5 -9 676.00 -54.5 -54.3 -54.7 72 -99 SPO 1997 04 29 19 40 1 10.5 -9 676.00 -54.6 -54.3 -54.7 73 -99 SPO 1997 04 29 19 41 1 10.4 -9 676.00 -54.6 -54.4 -54.8 73 -99 SPO 1997 04 29 19 42 1 10.4 -9 676.00 -54.6 -54.4 -54.8 73 -99 SPO 1997 04 29 19 43 1 10.5 -9 676.00 -54.7 -54.4 -54.8 74 -99 SPO 1997 04 29 19 44 2 10.8 -9 676.00 -54.7 -54.4 -54.8 73 -99 SPO 1997 04 29 19 45 1 10.2 -9 676.00 -54.7 -54.4 -54.9 73 -99 SPO 1997 04 29 19 46 2 10.1 -9 676.00 -54.8 -54.5 -55.0 73 -99 SPO 1997 04 29 19 47 2 10.5 -9 676.00 -54.8 -54.5 -55.0 71 -99 SPO 1997 04 29 19 48 1 10.3 -9 676.00 -54.8 -54.6 -55.0 71 -99 SPO 1997 04 29 19 49 0 10.5 -9 676.00 -54.9 -54.6 -55.0 72 -99 SPO 1997 04 29 19 50 359 10.6 -9 676.00 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 19 51 360 10.3 -9 676.00 -54.8 -54.6 -55.0 70 -99 SPO 1997 04 29 19 52 360 10.4 -9 676.10 -54.9 -54.6 -55.1 71 -99 SPO 1997 04 29 19 53 359 10.3 -9 676.10 -54.9 -54.6 -55.1 72 -99 SPO 1997 04 29 19 54 360 9.9 -9 676.10 -54.9 -54.7 -55.1 72 -99 SPO 1997 04 29 19 55 1 10.2 -9 676.00 -55.0 -54.7 -55.1 73 -99 SPO 1997 04 29 19 56 1 10.5 -9 676.00 -55.0 -54.7 -55.1 74 -99 SPO 1997 04 29 19 57 1 10.6 -9 676.10 -55.0 -54.7 -55.1 74 -99 SPO 1997 04 29 19 58 1 10.6 -9 676.10 -54.9 -54.7 -55.0 72 -99 SPO 1997 04 29 19 59 1 10.2 -9 676.10 -55.0 -54.7 -55.1 72 -99 SPO 1997 04 29 20 00 2 9.9 -9 676.10 -55.0 -54.7 -55.1 71 0 SPO 1997 04 29 20 01 2 9.9 -9 676.10 -55.0 -54.8 -55.1 71 -99 SPO 1997 04 29 20 02 1 10.1 -9 676.10 -55.0 -54.8 -55.1 71 -99 SPO 1997 04 29 20 03 1 10.2 -9 676.20 -54.9 -54.7 -55.1 70 -99 SPO 1997 04 29 20 04 360 9.8 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 05 1 10.2 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 06 0 10.2 -9 676.20 -55.0 -54.7 -55.0 71 -99 SPO 1997 04 29 20 07 360 9.9 -9 676.20 -55.0 -54.8 -55.1 71 -99 SPO 1997 04 29 20 08 359 9.9 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 09 359 10.0 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 10 360 10.2 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 11 359 10.2 -9 676.20 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 12 359 9.8 -9 676.20 -55.0 -54.7 -55.1 69 -99 SPO 1997 04 29 20 13 0 10.1 -9 676.20 -55.0 -54.7 -55.1 69 -99 SPO 1997 04 29 20 14 2 10.1 -9 676.20 -55.0 -54.6 -55.2 69 -99 SPO 1997 04 29 20 15 1 10.4 -9 676.20 -55.1 -54.6 -55.2 71 -99 SPO 1997 04 29 20 16 360 10.0 -9 676.30 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 17 0 9.7 -9 676.30 -55.1 -54.6 -55.2 72 -99 SPO 1997 04 29 20 18 359 9.8 -9 676.30 -55.0 -54.6 -55.2 71 -99 SPO 1997 04 29 20 19 359 9.8 -9 676.30 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 20 2 9.6 -9 676.30 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 21 2 9.6 -9 676.30 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 22 2 9.4 -9 676.40 -55.1 -54.7 -55.1 71 -99 SPO 1997 04 29 20 23 2 9.4 -9 676.40 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 24 2 9.3 -9 676.40 -55.0 -54.7 -55.2 71 -99 SPO 1997 04 29 20 25 2 9.7 -9 676.40 -55.0 -54.7 -55.2 71 -99 SPO 1997 04 29 20 26 2 9.7 -9 676.40 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 27 2 9.6 -9 676.40 -55.0 -54.7 -55.1 71 -99 SPO 1997 04 29 20 28 0 9.8 -9 676.40 -55.0 -54.7 -55.1 72 -99 SPO 1997 04 29 20 29 1 9.6 -9 676.40 -55.0 -54.6 -55.1 72 -99 SPO 1997 04 29 20 30 2 9.2 -9 676.40 -55.0 -54.6 -55.1 72 -99 SPO 1997 04 29 20 31 0 9.5 -9 676.50 -55.0 -54.6 -55.1 72 -99 SPO 1997 04 29 20 32 2 9.6 -9 676.40 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 33 2 9.6 -9 676.40 -55.0 -54.6 -55.1 71 -99 SPO 1997 04 29 20 34 1 9.8 -9 676.40 -55.0 -54.6 -55.0 71 -99 SPO 1997 04 29 20 35 3 9.7 -9 676.40 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 36 3 10.0 -9 676.40 -54.9 -54.5 -55.0 70 -99 SPO 1997 04 29 20 37 1 9.4 -9 676.40 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 38 3 9.6 -9 676.40 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 39 3 9.9 -9 676.40 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 40 1 9.8 -9 676.40 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 41 360 9.7 -9 676.50 -54.9 -54.6 -55.0 72 -99 SPO 1997 04 29 20 42 358 9.6 -9 676.50 -54.9 -54.6 -55.0 71 -99 SPO 1997 04 29 20 43 360 9.9 -9 676.50 -54.9 -54.6 -55.0 67 -99 SPO 1997 04 29 20 44 358 9.7 -9 676.50 -54.9 -54.6 -55.0 63 -99 SPO 1997 04 29 20 45 360 10.0 -9 676.50 -54.9 -54.6 -55.0 61 -99 SPO 1997 04 29 20 46 360 10.3 -9 676.50 -54.9 -54.5 -54.9 60 -99 SPO 1997 04 29 20 47 359 10.2 -9 676.50 -54.8 -54.5 -54.9 58 -99 SPO 1997 04 29 20 48 360 10.3 -9 676.50 -54.8 -54.4 -54.8 58 -99 SPO 1997 04 29 20 49 360 9.8 -9 676.40 -54.8 -54.4 -54.8 59 -99 SPO 1997 04 29 20 50 360 9.8 -9 676.40 -54.8 -54.4 -54.9 59 -99 SPO 1997 04 29 20 51 0 10.0 -9 676.40 -54.8 -54.4 -54.8 59 -99 SPO 1997 04 29 20 52 1 10.0 -9 676.40 -54.8 -54.4 -54.8 59 -99 SPO 1997 04 29 20 53 1 9.9 -9 676.40 -54.8 -54.4 -54.8 59 -99 SPO 1997 04 29 20 54 2 10.0 -9 676.40 -54.7 -54.5 -54.8 59 -99 SPO 1997 04 29 20 55 1 10.2 -9 676.40 -54.8 -54.5 -54.9 59 -99 SPO 1997 04 29 20 56 1 10.1 -9 676.40 -54.7 -54.6 -54.9 59 -99 SPO 1997 04 29 20 57 2 10.1 -9 676.40 -54.8 -54.6 -55.0 59 -99 SPO 1997 04 29 20 58 2 9.6 -9 676.30 -54.8 -54.6 -55.0 58 -99 SPO 1997 04 29 20 59 4 10.5 -9 676.40 -54.9 -54.7 -55.0 59 -99 SPO 1997 04 29 21 00 4 10.2 -9 676.30 -54.9 -54.6 -55.0 59 0 SPO 1997 04 29 21 01 3 9.8 -9 676.30 -54.9 -54.7 -55.1 59 -99 SPO 1997 04 29 21 02 3 10.1 -9 676.40 -54.9 -54.7 -55.1 59 -99 SPO 1997 04 29 21 03 2 10.3 -9 676.40 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 04 2 10.3 -9 676.40 -55.0 -54.7 -55.1 61 -99 SPO 1997 04 29 21 05 2 10.3 -9 676.40 -55.0 -54.7 -55.1 60 -99 SPO 1997 04 29 21 06 3 10.3 -9 676.40 -55.0 -54.7 -55.1 59 -99 SPO 1997 04 29 21 07 3 10.2 -9 676.40 -55.0 -54.7 -55.2 59 -99 SPO 1997 04 29 21 08 2 10.2 -9 676.30 -55.0 -54.7 -55.2 59 -99 SPO 1997 04 29 21 09 2 10.2 -9 676.40 -55.0 -54.7 -55.2 59 -99 SPO 1997 04 29 21 10 3 10.1 -9 676.30 -55.0 -54.8 -55.2 59 -99 SPO 1997 04 29 21 11 3 10.8 -9 676.40 -55.1 -54.8 -55.2 59 -99 SPO 1997 04 29 21 12 3 10.5 -9 676.40 -55.1 -54.8 -55.2 60 -99 SPO 1997 04 29 21 13 3 10.6 -9 676.40 -55.1 -54.8 -55.2 60 -99 SPO 1997 04 29 21 14 3 10.8 -9 676.30 -55.0 -54.8 -55.2 60 -99 SPO 1997 04 29 21 15 4 10.8 -9 676.30 -55.1 -54.8 -55.2 61 -99 SPO 1997 04 29 21 16 5 10.7 -9 676.30 -55.1 -54.8 -55.2 61 -99 SPO 1997 04 29 21 17 4 10.6 -9 676.30 -55.1 -54.8 -55.2 61 -99 SPO 1997 04 29 21 18 2 10.6 -9 676.30 -55.1 -54.7 -55.2 60 -99 SPO 1997 04 29 21 19 2 10.3 -9 676.30 -55.1 -54.7 -55.2 60 -99 SPO 1997 04 29 21 20 0 10.6 -9 676.30 -55.1 -54.7 -55.2 60 -99 SPO 1997 04 29 21 21 4 10.8 -9 676.20 -55.1 -54.7 -55.1 60 -99 SPO 1997 04 29 21 22 2 10.8 -9 676.20 -55.1 -54.6 -55.2 60 -99 SPO 1997 04 29 21 23 2 10.9 -9 676.20 -55.0 -54.6 -55.2 59 -99 SPO 1997 04 29 21 24 2 11.0 -9 676.30 -55.0 -54.6 -55.2 60 -99 SPO 1997 04 29 21 25 2 11.0 -9 676.30 -55.0 -54.5 -55.2 60 -99 SPO 1997 04 29 21 26 1 11.4 -9 676.20 -55.0 -54.5 -55.0 60 -99 SPO 1997 04 29 21 27 1 11.0 -9 676.30 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 28 1 10.8 -9 676.30 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 29 359 10.5 -9 676.30 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 30 0 10.5 -9 676.30 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 31 1 10.5 -9 676.30 -55.0 -54.6 -55.2 61 -99 SPO 1997 04 29 21 32 1 10.5 -9 676.30 -55.0 -54.6 -55.1 61 -99 SPO 1997 04 29 21 33 1 11.0 -9 676.30 -55.0 -54.4 -55.0 61 -99 SPO 1997 04 29 21 34 1 10.8 -9 676.30 -54.8 -54.4 -54.9 60 -99 SPO 1997 04 29 21 35 1 11.2 -9 676.30 -54.8 -54.3 -54.8 60 -99 SPO 1997 04 29 21 36 1 10.7 -9 676.30 -54.8 -54.3 -54.9 61 -99 SPO 1997 04 29 21 37 2 10.8 -9 676.30 -54.8 -54.4 -54.9 61 -99 SPO 1997 04 29 21 38 2 10.7 -9 676.30 -54.8 -54.4 -54.9 62 -99 SPO 1997 04 29 21 39 3 10.6 -9 676.30 -54.8 -54.3 -54.9 62 -99 SPO 1997 04 29 21 40 4 10.5 -9 676.30 -54.8 -54.3 -54.9 62 -99 SPO 1997 04 29 21 41 4 10.6 -9 676.20 -54.8 -54.3 -54.8 61 -99 SPO 1997 04 29 21 42 3 10.9 -9 676.20 -54.8 -54.3 -54.8 60 -99 SPO 1997 04 29 21 43 2 10.7 -9 676.30 -54.7 -54.3 -54.8 60 -99 SPO 1997 04 29 21 44 3 10.5 -9 676.30 -54.7 -54.3 -54.7 60 -99 SPO 1997 04 29 21 45 2 10.5 -9 676.30 -54.7 -54.3 -54.8 60 -99 SPO 1997 04 29 21 46 2 10.4 -9 676.30 -54.7 -54.3 -54.8 60 -99 SPO 1997 04 29 21 47 2 10.4 -9 676.30 -54.6 -54.2 -54.7 60 -99 SPO 1997 04 29 21 48 4 10.5 -9 676.30 -54.6 -54.1 -54.6 61 -99 SPO 1997 04 29 21 49 4 10.3 -9 676.30 -54.6 -54.1 -54.6 62 -99 SPO 1997 04 29 21 50 3 10.2 -9 676.30 -54.5 -54.1 -54.6 62 -99 SPO 1997 04 29 21 51 5 10.3 -9 676.30 -54.5 -54.1 -54.6 62 -99 SPO 1997 04 29 21 52 4 10.5 -9 676.30 -54.5 -54.1 -54.6 62 -99 SPO 1997 04 29 21 53 4 10.5 -9 676.30 -54.5 -54.1 -54.6 61 -99 SPO 1997 04 29 21 54 3 10.2 -9 676.40 -54.5 -54.1 -54.6 61 -99 SPO 1997 04 29 21 55 3 10.2 -9 676.40 -54.5 -54.0 -54.6 62 -99 SPO 1997 04 29 21 56 3 10.3 -9 676.40 -54.5 -54.0 -54.6 62 -99 SPO 1997 04 29 21 57 3 10.4 -9 676.40 -54.5 -53.9 -54.5 62 -99 SPO 1997 04 29 21 58 3 10.1 -9 676.40 -54.4 -54.0 -54.4 61 -99 SPO 1997 04 29 21 59 2 10.1 -9 676.40 -54.4 -54.0 -54.5 62 -99 SPO 1997 04 29 22 00 3 10.0 -9 676.40 -54.4 -54.0 -54.5 62 0 SPO 1997 04 29 22 01 3 10.1 -9 676.40 -54.4 -54.0 -54.4 63 -99 SPO 1997 04 29 22 02 2 10.3 -9 676.40 -54.4 -54.0 -54.4 63 -99 SPO 1997 04 29 22 03 3 10.1 -9 676.40 -54.4 -54.0 -54.4 63 -99 SPO 1997 04 29 22 04 3 10.2 -9 676.40 -54.4 -54.0 -54.5 62 -99 SPO 1997 04 29 22 05 3 10.4 -9 676.40 -54.4 -54.0 -54.5 62 -99 SPO 1997 04 29 22 06 3 9.8 -9 676.40 -54.4 -53.9 -54.5 61 -99 SPO 1997 04 29 22 07 3 10.4 -9 676.50 -54.4 -53.9 -54.4 61 -99 SPO 1997 04 29 22 08 2 10.5 -9 676.40 -54.3 -53.8 -54.4 60 -99 SPO 1997 04 29 22 09 2 10.1 -9 676.50 -54.3 -53.8 -54.4 62 -99 SPO 1997 04 29 22 10 2 10.1 -9 676.40 -54.3 -53.8 -54.5 62 -99 SPO 1997 04 29 22 11 3 10.1 -9 676.40 -54.3 -53.7 -54.4 63 -99 SPO 1997 04 29 22 12 2 10.3 -9 676.40 -54.3 -53.8 -54.4 63 -99 SPO 1997 04 29 22 13 3 10.5 -9 676.40 -54.3 -53.7 -54.3 63 -99 SPO 1997 04 29 22 14 1 10.1 -9 676.50 -54.2 -53.8 -54.3 63 -99 SPO 1997 04 29 22 15 1 10.1 -9 676.50 -54.2 -53.8 -54.4 63 -99 SPO 1997 04 29 22 16 1 10.0 -9 676.50 -54.3 -53.9 -54.4 63 -99 SPO 1997 04 29 22 17 0 9.9 -9 676.50 -54.3 -53.9 -54.4 63 -99 SPO 1997 04 29 22 18 1 10.2 -9 676.50 -54.2 -53.9 -54.3 63 -99 SPO 1997 04 29 22 19 1 10.1 -9 676.50 -54.2 -53.8 -54.2 62 -99 SPO 1997 04 29 22 20 360 10.2 -9 676.50 -54.2 -53.8 -54.3 63 -99 SPO 1997 04 29 22 21 360 10.4 -9 676.60 -54.2 -53.8 -54.2 64 -99 SPO 1997 04 29 22 22 358 10.3 -9 676.60 -54.1 -53.8 -54.1 64 -99 SPO 1997 04 29 22 23 360 10.1 -9 676.60 -54.0 -53.7 -54.0 64 -99 SPO 1997 04 29 22 24 1 10.1 -9 676.60 -54.0 -53.7 -54.1 65 -99 SPO 1997 04 29 22 25 359 10.0 -9 676.60 -54.0 -53.7 -54.1 66 -99 SPO 1997 04 29 22 26 359 9.8 -9 676.60 -54.0 -53.7 -54.1 65 -99 SPO 1997 04 29 22 27 1 9.8 -9 676.60 -53.9 -53.7 -54.0 64 -99 SPO 1997 04 29 22 28 0 9.8 -9 676.60 -53.9 -53.7 -54.0 63 -99 SPO 1997 04 29 22 29 359 10.0 -9 676.60 -53.9 -53.6 -53.9 63 -99 SPO 1997 04 29 22 30 360 10.0 -9 676.60 -53.8 -53.6 -53.9 63 -99 SPO 1997 04 29 22 31 1 9.8 -9 676.60 -53.8 -53.6 -53.8 64 -99 SPO 1997 04 29 22 32 1 10.0 -9 676.60 -53.7 -53.6 -53.8 64 -99 SPO 1997 04 29 22 33 0 10.0 -9 676.60 -53.7 -53.6 -53.8 64 -99 SPO 1997 04 29 22 34 3 10.0 -9 676.50 -53.7 -53.7 -53.8 66 -99 SPO 1997 04 29 22 35 1 9.9 -9 676.50 -53.7 -53.7 -53.8 66 -99 SPO 1997 04 29 22 36 3 10.3 -9 676.50 -53.7 -53.6 -53.8 66 -99 SPO 1997 04 29 22 37 1 10.0 -9 676.50 -53.6 -53.6 -53.7 66 -99 SPO 1997 04 29 22 38 2 10.4 -9 676.50 -53.6 -53.6 -53.7 66 -99 SPO 1997 04 29 22 39 3 10.2 -9 676.50 -53.6 -53.6 -53.7 65 -99 SPO 1997 04 29 22 40 1 9.9 -9 676.50 -53.6 -53.5 -53.7 65 -99 SPO 1997 04 29 22 41 2 10.3 -9 676.50 -53.6 -53.5 -53.6 65 -99 SPO 1997 04 29 22 42 2 10.7 -9 676.50 -53.5 -53.5 -53.6 64 -99 SPO 1997 04 29 22 43 1 10.7 -9 676.50 -53.5 -53.4 -53.6 66 -99 SPO 1997 04 29 22 44 3 10.2 -9 676.50 -53.4 -53.4 -53.5 65 -99 SPO 1997 04 29 22 45 2 10.2 -9 676.50 -53.4 -53.4 -53.5 66 -99 SPO 1997 04 29 22 46 1 10.5 -9 676.50 -53.4 -53.4 -53.5 66 -99 SPO 1997 04 29 22 47 2 10.1 -9 676.60 -53.4 -53.4 -53.5 66 -99 SPO 1997 04 29 22 48 1 9.7 -9 676.60 -53.4 -53.4 -53.5 65 -99 SPO 1997 04 29 22 49 3 9.9 -9 676.60 -53.4 -53.4 -53.5 65 -99 SPO 1997 04 29 22 50 2 10.1 -9 676.60 -53.4 -53.4 -53.4 65 -99 SPO 1997 04 29 22 51 1 10.4 -9 676.60 -53.3 -53.4 -53.4 64 -99 SPO 1997 04 29 22 52 1 10.2 -9 676.60 -53.3 -53.4 -53.4 65 -99 SPO 1997 04 29 22 53 1 10.3 -9 676.60 -53.3 -53.3 -53.4 65 -99 SPO 1997 04 29 22 54 2 10.2 -9 676.60 -53.3 -53.3 -53.4 66 -99 SPO 1997 04 29 22 55 3 10.1 -9 676.60 -53.2 -53.2 -53.3 65 -99 SPO 1997 04 29 22 56 2 10.4 -9 676.60 -53.2 -53.2 -53.3 66 -99 SPO 1997 04 29 22 57 2 10.6 -9 676.50 -53.2 -53.2 -53.3 67 -99 SPO 1997 04 29 22 58 2 10.3 -9 676.50 -53.2 -53.2 -53.3 67 -99 SPO 1997 04 29 22 59 3 10.7 -9 676.50 -53.2 -53.2 -53.3 67 -99 SPO 1997 04 29 23 00 3 10.2 -9 676.50 -53.2 -53.1 -53.3 67 0 SPO 1997 04 29 23 01 3 9.9 -9 676.50 -53.2 -53.2 -53.3 67 -99 SPO 1997 04 29 23 02 4 10.8 -9 676.50 -53.2 -53.1 -53.3 65 -99 SPO 1997 04 29 23 03 3 10.3 -9 676.50 -53.2 -53.1 -53.3 65 -99 SPO 1997 04 29 23 04 3 10.0 -9 676.50 -53.2 -53.1 -53.4 65 -99 SPO 1997 04 29 23 05 3 9.5 -9 676.50 -53.2 -53.2 -53.3 64 -99 SPO 1997 04 29 23 06 3 10.3 -9 676.50 -53.2 -53.2 -53.3 65 -99 SPO 1997 04 29 23 07 1 10.6 -9 676.50 -53.2 -53.1 -53.2 65 -99 SPO 1997 04 29 23 08 3 10.4 -9 676.50 -53.1 -53.2 -53.2 66 -99 SPO 1997 04 29 23 09 3 10.0 -9 676.50 -53.1 -53.2 -53.3 67 -99 SPO 1997 04 29 23 10 3 10.2 -9 676.50 -53.1 -53.2 -53.3 68 -99 SPO 1997 04 29 23 11 2 9.9 -9 676.50 -53.1 -53.2 -53.3 68 -99 SPO 1997 04 29 23 12 1 10.2 -9 676.50 -53.1 -53.1 -53.2 67 -99 SPO 1997 04 29 23 13 1 10.2 -9 676.50 -53.1 -53.1 -53.2 66 -99 SPO 1997 04 29 23 14 0 10.1 -9 676.50 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 15 1 10.5 -9 676.60 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 16 1 10.0 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 17 360 10.2 -9 676.60 -53.0 -52.9 -53.0 67 -99 SPO 1997 04 29 23 18 0 10.2 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 19 0 9.9 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 20 360 9.8 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 21 1 9.9 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 22 0 10.0 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 23 1 10.2 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 24 360 10.2 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 25 1 10.3 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 26 1 9.6 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 27 1 9.5 -9 676.60 -52.9 -53.0 -53.1 65 -99 SPO 1997 04 29 23 28 2 10.2 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 29 0 10.4 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 30 1 10.0 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 31 1 10.4 -9 676.60 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 32 360 10.1 -9 676.60 -52.9 -52.9 -53.1 66 -99 SPO 1997 04 29 23 33 360 10.1 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 34 359 10.1 -9 676.60 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 35 1 9.9 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 36 0 9.5 -9 676.60 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 37 0 9.6 -9 676.70 -53.0 -52.9 -53.1 67 -99 SPO 1997 04 29 23 38 360 9.6 -9 676.70 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 39 4 9.7 -9 676.70 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 40 1 9.2 -9 676.70 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 41 4 9.2 -9 676.70 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 42 0 9.4 -9 676.80 -53.0 -53.0 -53.1 65 -99 SPO 1997 04 29 23 43 4 9.5 -9 676.80 -52.9 -53.0 -53.0 65 -99 SPO 1997 04 29 23 44 360 9.2 -9 676.80 -52.9 -53.0 -53.0 66 -99 SPO 1997 04 29 23 45 2 8.9 -9 676.80 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 46 2 9.2 -9 676.80 -53.0 -53.0 -53.1 68 -99 SPO 1997 04 29 23 47 2 9.2 -9 676.80 -53.0 -53.0 -53.1 67 -99 SPO 1997 04 29 23 48 2 9.4 -9 676.80 -53.0 -53.0 -53.1 66 -99 SPO 1997 04 29 23 49 2 9.3 -9 676.70 -52.9 -52.9 -53.1 65 -99 SPO 1997 04 29 23 50 3 9.3 -9 676.70 -52.9 -53.0 -53.1 65 -99 SPO 1997 04 29 23 51 3 9.5 -9 676.70 -52.9 -52.9 -53.0 65 -99 SPO 1997 04 29 23 52 2 9.7 -9 676.70 -52.9 -52.9 -53.0 66 -99 SPO 1997 04 29 23 53 3 9.6 -9 676.70 -52.9 -52.9 -53.0 66 -99 SPO 1997 04 29 23 54 2 9.5 -9 676.70 -52.9 -52.8 -53.0 67 -99 SPO 1997 04 29 23 55 1 9.6 -9 676.70 -52.9 -52.8 -52.9 67 -99 SPO 1997 04 29 23 56 2 9.7 -9 676.80 -52.8 -52.8 -52.9 66 -99 SPO 1997 04 29 23 57 2 9.3 -9 676.80 -52.8 -52.9 -53.0 67 -99 SPO 1997 04 29 23 58 2 9.3 -9 676.80 -52.9 -52.9 -53.0 -99 -99 SPO 1997 04 29 23 59 1 9.0 -9 676.80 -52.9 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 00 2 9.0 -9 676.80 -52.9 -53.0 -53.0 -99 0 SPO 1997 04 30 00 01 2 9.2 -9 676.80 -52.9 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 02 2 8.9 -9 676.80 -52.8 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 03 3 9.1 -9 676.80 -52.9 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 04 4 8.9 -9 676.80 -52.8 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 05 4 8.8 -9 676.80 -52.8 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 06 2 9.0 -9 676.90 -52.8 -52.9 -53.0 -99 -99 SPO 1997 04 30 00 07 2 9.0 -9 676.80 -52.8 -52.8 -52.9 -99 -99 SPO 1997 04 30 00 08 2 9.1 -9 676.80 -52.8 -52.8 -52.9 -99 -99 SPO 1997 04 30 00 09 2 9.0 -9 676.80 -52.8 -52.8 -52.9 -99 -99 SPO 1997 04 30 00 10 4 9.3 -9 676.80 -52.8 -52.8 -52.9 -99 -99 SPO 1997 04 30 00 11 2 9.1 -9 676.80 -52.8 -52.7 -52.9 -99 -99 SPO 1997 04 30 00 12 4 8.9 -9 676.80 -52.8 -52.7 -52.9 -99 -99 SPO 1997 04 30 00 13 4 9.2 -9 676.70 -52.7 -52.7 -52.8 65 -99 SPO 1997 04 30 00 14 3 9.2 -9 676.70 -52.7 -52.6 -52.8 65 -99 SPO 1997 04 30 00 15 4 9.5 -9 676.70 -52.7 -52.7 -52.8 65 -99 SPO 1997 04 30 00 16 3 9.5 -9 676.70 -52.7 -52.7 -52.7 66 -99 SPO 1997 04 30 00 17 1 9.2 -9 676.80 -52.6 -52.7 -52.8 65 -99 SPO 1997 04 30 00 18 1 9.3 -9 676.80 -52.6 -52.6 -52.7 65 -99 SPO 1997 04 30 00 19 5 9.5 -9 676.70 -52.6 -52.5 -52.7 66 -99 SPO 1997 04 30 00 20 2 9.4 -9 676.80 -52.6 -52.5 -52.6 67 -99 SPO 1997 04 30 00 21 5 9.2 -9 676.80 -52.5 -52.4 -52.6 67 -99 SPO 1997 04 30 00 22 4 9.3 -9 676.80 -52.5 -52.4 -52.6 67 -99 SPO 1997 04 30 00 23 4 9.3 -9 676.80 -52.5 -52.4 -52.5 66 -99 SPO 1997 04 30 00 24 5 9.0 -9 676.80 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 30 00 25 5 8.9 -9 676.80 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 30 00 26 6 9.0 -9 676.80 -52.4 -52.3 -52.5 65 -99 SPO 1997 04 30 00 27 5 8.5 -9 676.80 -52.4 -52.4 -52.5 66 -99 SPO 1997 04 30 00 28 5 8.8 -9 676.80 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 00 29 5 8.9 -9 676.80 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 00 30 5 8.8 -9 676.80 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 00 31 4 8.5 -9 676.80 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 00 32 3 9.3 -9 676.80 -52.4 -52.4 -52.4 68 -99 SPO 1997 04 30 00 33 5 9.3 -9 676.80 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 30 00 34 0 8.7 -9 676.80 -52.3 -52.4 -52.5 68 -99 SPO 1997 04 30 00 35 4 9.2 -9 676.80 -52.3 -52.4 -52.5 66 -99 SPO 1997 04 30 00 36 6 9.0 -9 676.70 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 30 00 37 2 9.4 -9 676.70 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 00 38 1 9.1 -9 676.70 -52.3 -52.4 -52.4 66 -99 SPO 1997 04 30 00 39 3 9.4 -9 676.70 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 00 40 2 9.3 -9 676.70 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 30 00 41 3 9.4 -9 676.70 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 00 42 1 9.5 -9 676.70 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 00 43 3 9.5 -9 676.60 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 30 00 44 0 9.7 -9 676.60 -52.3 -52.3 -52.4 67 -99 SPO 1997 04 30 00 45 0 9.4 -9 676.70 -52.3 -52.3 -52.4 67 -99 SPO 1997 04 30 00 46 3 10.0 -9 676.60 -52.3 -52.3 -52.5 66 -99 SPO 1997 04 30 00 47 360 10.1 -9 676.60 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 30 00 48 0 10.3 -9 676.50 -52.3 -52.4 -52.5 65 -99 SPO 1997 04 30 00 49 0 9.9 -9 676.50 -52.3 -52.4 -52.5 65 -99 SPO 1997 04 30 00 50 360 10.1 -9 676.50 -52.3 -52.4 -52.5 66 -99 SPO 1997 04 30 00 51 1 9.7 -9 676.50 -52.3 -52.4 -52.5 66 -99 SPO 1997 04 30 00 52 0 10.5 -9 676.50 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 00 53 0 10.2 -9 676.50 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 00 54 1 10.3 -9 676.50 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 00 55 0 10.2 -9 676.50 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 00 56 0 10.2 -9 676.50 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 30 00 57 2 10.3 -9 676.50 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 30 00 58 1 10.2 -9 676.50 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 00 59 359 9.8 -9 676.50 -52.4 -52.4 -52.5 66 -99 SPO 1997 04 30 01 00 1 10.1 -9 676.50 -52.4 -52.4 -52.5 66 0 SPO 1997 04 30 01 01 1 9.7 -9 676.50 -52.4 -52.3 -52.5 66 -99 SPO 1997 04 30 01 02 0 9.8 -9 676.50 -52.4 -52.3 -52.5 66 -99 SPO 1997 04 30 01 03 3 10.3 -9 676.50 -52.4 -52.3 -52.5 66 -99 SPO 1997 04 30 01 04 4 10.3 -9 676.50 -52.3 -52.4 -52.5 65 -99 SPO 1997 04 30 01 05 0 9.6 -9 676.60 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 01 06 2 10.1 -9 676.50 -52.4 -52.4 -52.5 68 -99 SPO 1997 04 30 01 07 4 9.7 -9 676.50 -52.4 -52.5 -52.5 68 -99 SPO 1997 04 30 01 08 4 9.5 -9 676.50 -52.4 -52.5 -52.5 67 -99 SPO 1997 04 30 01 09 2 9.7 -9 676.60 -52.4 -52.5 -52.5 66 -99 SPO 1997 04 30 01 10 3 9.7 -9 676.60 -52.4 -52.5 -52.5 66 -99 SPO 1997 04 30 01 11 4 9.3 -9 676.50 -52.4 -52.5 -52.6 65 -99 SPO 1997 04 30 01 12 359 9.5 -9 676.60 -52.4 -52.5 -52.5 65 -99 SPO 1997 04 30 01 13 359 9.6 -9 676.60 -52.4 -52.5 -52.5 65 -99 SPO 1997 04 30 01 14 2 9.5 -9 676.60 -52.4 -52.4 -52.5 66 -99 SPO 1997 04 30 01 15 3 9.7 -9 676.50 -52.4 -52.4 -52.5 66 -99 SPO 1997 04 30 01 16 2 9.6 -9 676.50 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 01 17 357 9.9 -9 676.60 -52.4 -52.4 -52.5 67 -99 SPO 1997 04 30 01 18 1 9.8 -9 676.60 -52.4 -52.3 -52.5 68 -99 SPO 1997 04 30 01 19 1 10.3 -9 676.50 -52.3 -52.3 -52.4 68 -99 SPO 1997 04 30 01 20 1 10.2 -9 676.60 -52.3 -52.3 -52.4 67 -99 SPO 1997 04 30 01 21 0 10.1 -9 676.60 -52.3 -52.2 -52.4 66 -99 SPO 1997 04 30 01 22 360 10.1 -9 676.60 -52.3 -52.3 -52.4 66 -99 SPO 1997 04 30 01 23 2 10.2 -9 676.60 -52.3 -52.3 -52.4 66 -99 SPO 1997 04 30 01 24 2 10.1 -9 676.50 -52.3 -52.3 -52.4 67 -99 SPO 1997 04 30 01 25 3 10.2 -9 676.50 -52.3 -52.3 -52.4 67 -99 SPO 1997 04 30 01 26 0 9.9 -9 676.60 -52.3 -52.3 -52.4 68 -99 SPO 1997 04 30 01 27 0 10.2 -9 676.50 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 01 28 0 10.2 -9 676.50 -52.3 -52.3 -52.4 69 -99 SPO 1997 04 30 01 29 0 10.1 -9 676.60 -52.3 -52.2 -52.4 69 -99 SPO 1997 04 30 01 30 1 10.5 -9 676.50 -52.2 -52.2 -52.3 69 -99 SPO 1997 04 30 01 31 1 10.1 -9 676.50 -52.2 -52.2 -52.3 69 -99 SPO 1997 04 30 01 32 1 10.2 -9 676.50 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 01 33 1 10.4 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 34 0 10.1 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 35 2 10.6 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 36 2 10.4 -9 676.50 -52.2 -52.2 -52.4 66 -99 SPO 1997 04 30 01 37 4 10.6 -9 676.50 -52.2 -52.2 -52.4 67 -99 SPO 1997 04 30 01 38 2 10.7 -9 676.40 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 39 1 11.1 -9 676.40 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 40 1 10.6 -9 676.40 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 41 360 10.7 -9 676.40 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 01 42 0 10.2 -9 676.40 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 01 43 360 10.2 -9 676.40 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 01 44 0 10.9 -9 676.40 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 01 45 360 11.0 -9 676.40 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 01 46 360 10.5 -9 676.40 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 01 47 360 10.1 -9 676.50 -52.1 -52.2 -52.3 65 -99 SPO 1997 04 30 01 48 360 10.1 -9 676.50 -52.1 -52.2 -52.3 65 -99 SPO 1997 04 30 01 49 359 10.4 -9 676.50 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 30 01 50 360 10.2 -9 676.50 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 30 01 51 360 10.4 -9 676.50 -52.1 -52.1 -52.2 66 -99 SPO 1997 04 30 01 52 359 10.2 -9 676.50 -52.1 -52.1 -52.2 67 -99 SPO 1997 04 30 01 53 359 10.4 -9 676.50 -52.1 -52.1 -52.2 67 -99 SPO 1997 04 30 01 54 358 10.3 -9 676.50 -52.1 -52.1 -52.2 67 -99 SPO 1997 04 30 01 55 358 10.5 -9 676.50 -52.1 -52.1 -52.2 66 -99 SPO 1997 04 30 01 56 357 10.3 -9 676.50 -52.1 -52.1 -52.2 66 -99 SPO 1997 04 30 01 57 357 10.4 -9 676.50 -52.1 -52.1 -52.2 66 -99 SPO 1997 04 30 01 58 357 10.3 -9 676.50 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 01 59 357 10.5 -9 676.50 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 02 00 357 10.4 -9 676.60 -52.0 -52.1 -52.2 66 0 SPO 1997 04 30 02 01 358 10.1 -9 676.60 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 02 02 358 10.4 -9 676.50 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 02 03 358 10.4 -9 676.50 -52.0 -52.1 -52.2 67 -99 SPO 1997 04 30 02 04 358 10.1 -9 676.50 -52.0 -52.1 -52.2 67 -99 SPO 1997 04 30 02 05 357 10.5 -9 676.60 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 02 06 358 10.4 -9 676.50 -52.0 -52.1 -52.1 67 -99 SPO 1997 04 30 02 07 358 10.3 -9 676.50 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 08 357 10.9 -9 676.50 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 09 357 10.6 -9 676.50 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 10 358 10.2 -9 676.50 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 11 359 10.3 -9 676.60 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 12 358 10.2 -9 676.60 -52.0 -52.0 -52.1 66 -99 SPO 1997 04 30 02 13 357 9.7 -9 676.60 -52.0 -52.1 -52.1 66 -99 SPO 1997 04 30 02 14 357 9.5 -9 676.60 -52.0 -52.1 -52.2 67 -99 SPO 1997 04 30 02 15 357 9.8 -9 676.60 -52.0 -52.2 -52.2 68 -99 SPO 1997 04 30 02 16 357 9.7 -9 676.60 -52.0 -52.2 -52.2 68 -99 SPO 1997 04 30 02 17 358 9.7 -9 676.60 -52.0 -52.2 -52.2 68 -99 SPO 1997 04 30 02 18 359 9.5 -9 676.60 -52.0 -52.2 -52.2 67 -99 SPO 1997 04 30 02 19 359 9.5 -9 676.60 -52.0 -52.2 -52.2 66 -99 SPO 1997 04 30 02 20 359 9.7 -9 676.60 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 21 359 9.9 -9 676.60 -52.1 -52.2 -52.2 66 -99 SPO 1997 04 30 02 22 359 10.1 -9 676.60 -52.1 -52.2 -52.2 66 -99 SPO 1997 04 30 02 23 359 9.7 -9 676.50 -52.1 -52.2 -52.2 66 -99 SPO 1997 04 30 02 24 359 9.5 -9 676.60 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 25 1 9.4 -9 676.50 -52.1 -52.2 -52.2 68 -99 SPO 1997 04 30 02 26 359 9.6 -9 676.50 -52.1 -52.2 -52.2 68 -99 SPO 1997 04 30 02 27 359 10.1 -9 676.60 -52.1 -52.2 -52.2 68 -99 SPO 1997 04 30 02 28 360 9.7 -9 676.60 -52.1 -52.2 -52.2 68 -99 SPO 1997 04 30 02 29 360 10.2 -9 676.50 -52.1 -52.1 -52.2 68 -99 SPO 1997 04 30 02 30 360 10.0 -9 676.50 -52.1 -52.2 -52.2 68 -99 SPO 1997 04 30 02 31 359 10.0 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 32 358 9.4 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 33 358 9.9 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 34 358 9.5 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 35 358 9.5 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 36 359 9.6 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 37 359 9.8 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 38 359 9.8 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 39 360 9.4 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 40 359 9.6 -9 676.50 -52.1 -52.2 -52.2 67 -99 SPO 1997 04 30 02 41 360 9.1 -9 676.60 -52.1 -52.2 -52.3 67 -99 SPO 1997 04 30 02 42 359 9.4 -9 676.60 -52.1 -52.2 -52.3 66 -99 SPO 1997 04 30 02 43 359 9.6 -9 676.60 -52.1 -52.2 -52.3 66 -99 SPO 1997 04 30 02 44 357 9.2 -9 676.60 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 02 45 358 9.0 -9 676.60 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 30 02 46 358 9.5 -9 676.60 -52.2 -52.2 -52.4 65 -99 SPO 1997 04 30 02 47 358 9.3 -9 676.60 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 30 02 48 358 9.0 -9 676.60 -52.2 -52.3 -52.3 65 -99 SPO 1997 04 30 02 49 358 8.6 -9 676.60 -52.2 -52.3 -52.4 66 -99 SPO 1997 04 30 02 50 359 9.1 -9 676.60 -52.2 -52.3 -52.3 66 -99 SPO 1997 04 30 02 51 358 9.1 -9 676.60 -52.2 -52.4 -52.4 66 -99 SPO 1997 04 30 02 52 359 9.1 -9 676.60 -52.2 -52.4 -52.4 66 -99 SPO 1997 04 30 02 53 360 9.1 -9 676.60 -52.2 -52.4 -52.4 66 -99 SPO 1997 04 30 02 54 0 9.6 -9 676.60 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 02 55 1 8.9 -9 676.50 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 02 56 360 9.1 -9 676.50 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 02 57 359 9.3 -9 676.60 -52.3 -52.4 -52.4 67 -99 SPO 1997 04 30 02 58 359 9.4 -9 676.60 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 02 59 359 9.4 -9 676.60 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 03 00 359 9.8 -9 676.60 -52.2 -52.3 -52.4 68 0 SPO 1997 04 30 03 01 359 9.3 -9 676.60 -52.2 -52.3 -52.3 68 -99 SPO 1997 04 30 03 02 358 10.1 -9 676.50 -52.2 -52.3 -52.4 69 -99 SPO 1997 04 30 03 03 360 9.8 -9 676.50 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 03 04 360 9.5 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 05 359 9.6 -9 676.50 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 06 359 9.9 -9 676.50 -52.2 -52.3 -52.3 66 -99 SPO 1997 04 30 03 07 359 9.7 -9 676.50 -52.2 -52.3 -52.3 66 -99 SPO 1997 04 30 03 08 359 9.8 -9 676.50 -52.2 -52.3 -52.4 66 -99 SPO 1997 04 30 03 09 359 9.5 -9 676.50 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 03 10 0 9.6 -9 676.50 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 03 11 359 9.9 -9 676.50 -52.2 -52.3 -52.4 67 -99 SPO 1997 04 30 03 12 1 10.2 -9 676.50 -52.2 -52.3 -52.3 67 -99 SPO 1997 04 30 03 13 1 9.7 -9 676.50 -52.2 -52.3 -52.3 67 -99 SPO 1997 04 30 03 14 0 9.6 -9 676.50 -52.2 -52.3 -52.3 67 -99 SPO 1997 04 30 03 15 1 9.7 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 16 1 9.7 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 17 1 9.7 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 18 2 9.6 -9 676.50 -52.2 -52.1 -52.3 66 -99 SPO 1997 04 30 03 19 3 9.7 -9 676.50 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 30 03 20 2 9.5 -9 676.50 -52.1 -52.1 -52.2 65 -99 SPO 1997 04 30 03 21 4 9.7 -9 676.50 -52.1 -52.2 -52.3 65 -99 SPO 1997 04 30 03 22 3 9.5 -9 676.60 -52.1 -52.1 -52.3 65 -99 SPO 1997 04 30 03 23 3 9.6 -9 676.50 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 24 3 9.4 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 25 2 9.3 -9 676.60 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 26 3 9.4 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 27 3 9.4 -9 676.50 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 28 2 9.3 -9 676.60 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 29 2 9.8 -9 676.60 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 30 2 9.4 -9 676.60 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 31 2 9.6 -9 676.50 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 30 03 32 3 9.7 -9 676.50 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 30 03 33 1 9.3 -9 676.60 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 34 3 9.6 -9 676.50 -52.2 -52.1 -52.3 67 -99 SPO 1997 04 30 03 35 3 9.5 -9 676.50 -52.2 -52.1 -52.3 67 -99 SPO 1997 04 30 03 36 3 9.7 -9 676.50 -52.2 -52.1 -52.3 67 -99 SPO 1997 04 30 03 37 3 9.3 -9 676.60 -52.2 -52.1 -52.2 68 -99 SPO 1997 04 30 03 38 4 9.3 -9 676.60 -52.2 -52.1 -52.3 67 -99 SPO 1997 04 30 03 39 2 9.1 -9 676.60 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 40 3 9.6 -9 676.60 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 41 3 9.8 -9 676.50 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 42 3 9.8 -9 676.50 -52.2 -52.2 -52.3 66 -99 SPO 1997 04 30 03 43 4 9.5 -9 676.50 -52.2 -52.1 -52.3 66 -99 SPO 1997 04 30 03 44 4 9.6 -9 676.60 -52.2 -52.2 -52.3 67 -99 SPO 1997 04 30 03 45 3 9.8 -9 676.60 -52.2 -52.1 -52.3 67 -99 SPO 1997 04 30 03 46 4 9.6 -9 676.60 -52.2 -52.1 -52.3 68 -99 SPO 1997 04 30 03 47 4 9.4 -9 676.60 -52.2 -52.1 -52.3 68 -99 SPO 1997 04 30 03 48 4 9.3 -9 676.60 -52.2 -52.1 -52.3 69 -99 SPO 1997 04 30 03 49 4 9.8 -9 676.60 -52.1 -52.0 -52.2 68 -99 SPO 1997 04 30 03 50 2 9.8 -9 676.60 -52.1 -52.0 -52.2 68 -99 SPO 1997 04 30 03 51 2 9.8 -9 676.60 -52.1 -51.9 -52.1 68 -99 SPO 1997 04 30 03 52 1 9.4 -9 676.60 -52.1 -51.9 -52.1 68 -99 SPO 1997 04 30 03 53 3 9.4 -9 676.60 -52.0 -51.9 -52.1 67 -99 SPO 1997 04 30 03 54 3 9.3 -9 676.60 -52.1 -52.0 -52.2 68 -99 SPO 1997 04 30 03 55 3 9.4 -9 676.60 -52.1 -52.0 -52.2 68 -99 SPO 1997 04 30 03 56 3 9.5 -9 676.60 -52.1 -52.0 -52.2 67 -99 SPO 1997 04 30 03 57 3 9.1 -9 676.60 -52.1 -52.1 -52.3 67 -99 SPO 1997 04 30 03 58 3 8.9 -9 676.60 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 03 59 2 9.2 -9 676.70 -52.2 -52.2 -52.3 68 -99 SPO 1997 04 30 04 00 2 9.4 -9 676.60 -52.2 -52.2 -52.3 69 0 SPO 1997 04 30 04 01 1 9.4 -9 676.60 -52.2 -52.2 -52.3 69 -99 SPO 1997 04 30 04 02 2 9.2 -9 676.60 -52.2 -52.2 -52.4 69 -99 SPO 1997 04 30 04 03 1 9.4 -9 676.60 -52.2 -52.2 -52.4 68 -99 SPO 1997 04 30 04 04 359 9.4 -9 676.60 -52.3 -52.2 -52.3 68 -99 SPO 1997 04 30 04 05 0 9.3 -9 676.70 -52.2 -52.2 -52.4 67 -99 SPO 1997 04 30 04 06 2 9.4 -9 676.60 -52.2 -52.1 -52.4 66 -99 SPO 1997 04 30 04 07 2 9.6 -9 676.60 -52.3 -52.1 -52.4 67 -99 SPO 1997 04 30 04 08 2 9.7 -9 676.70 -52.3 -52.0 -52.4 68 -99 SPO 1997 04 30 04 09 1 9.4 -9 676.70 -52.2 -52.0 -52.3 67 -99 SPO 1997 04 30 04 10 2 9.4 -9 676.70 -52.2 -52.0 -52.3 68 -99 SPO 1997 04 30 04 11 1 9.3 -9 676.70 -52.2 -52.0 -52.3 68 -99 SPO 1997 04 30 04 12 2 9.2 -9 676.70 -52.2 -52.0 -52.4 68 -99 SPO 1997 04 30 04 13 2 8.9 -9 676.70 -52.2 -52.0 -52.4 68 -99 SPO 1997 04 30 04 14 1 8.9 -9 676.80 -52.3 -52.1 -52.4 68 -99 SPO 1997 04 30 04 15 0 8.9 -9 676.80 -52.3 -52.2 -52.4 67 -99 SPO 1997 04 30 04 16 0 9.2 -9 676.70 -52.3 -52.2 -52.4 67 -99 SPO 1997 04 30 04 17 0 9.3 -9 676.70 -52.3 -52.2 -52.4 66 -99 SPO 1997 04 30 04 18 1 9.6 -9 676.70 -52.3 -52.2 -52.4 66 -99 SPO 1997 04 30 04 19 1 9.3 -9 676.70 -52.3 -52.1 -52.4 67 -99 SPO 1997 04 30 04 20 0 9.3 -9 676.70 -52.3 -52.2 -52.4 68 -99 SPO 1997 04 30 04 21 1 9.1 -9 676.70 -52.3 -52.1 -52.4 68 -99 SPO 1997 04 30 04 22 0 9.1 -9 676.70 -52.4 -52.1 -52.5 69 -99 SPO 1997 04 30 04 23 359 9.5 -9 676.70 -52.3 -52.1 -52.4 68 -99 SPO 1997 04 30 04 24 359 9.2 -9 676.70 -52.3 -52.1 -52.5 68 -99 SPO 1997 04 30 04 25 359 9.4 -9 676.70 -52.3 -52.1 -52.5 68 -99 SPO 1997 04 30 04 26 358 9.2 -9 676.70 -52.4 -52.1 -52.5 69 -99 SPO 1997 04 30 04 27 359 9.1 -9 676.80 -52.4 -52.1 -52.5 68 -99 SPO 1997 04 30 04 28 359 9.4 -9 676.80 -52.4 -52.1 -52.5 67 -99 SPO 1997 04 30 04 29 359 9.1 -9 676.80 -52.4 -52.1 -52.5 66 -99 SPO 1997 04 30 04 30 358 9.2 -9 676.80 -52.4 -52.1 -52.5 66 -99 SPO 1997 04 30 04 31 358 8.9 -9 676.80 -52.4 -52.2 -52.5 66 -99 SPO 1997 04 30 04 32 359 9.1 -9 676.80 -52.4 -52.2 -52.5 66 -99 SPO 1997 04 30 04 33 359 9.3 -9 676.80 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 34 359 9.3 -9 676.80 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 35 1 9.7 -9 676.70 -52.4 -52.2 -52.5 67 -99 SPO 1997 04 30 04 36 0 9.7 -9 676.70 -52.4 -52.2 -52.5 67 -99 SPO 1997 04 30 04 37 359 9.2 -9 676.70 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 38 359 9.1 -9 676.80 -52.5 -52.3 -52.6 67 -99 SPO 1997 04 30 04 39 358 9.2 -9 676.70 -52.5 -52.3 -52.6 66 -99 SPO 1997 04 30 04 40 359 9.5 -9 676.70 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 04 41 358 9.6 -9 676.70 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 04 42 358 9.8 -9 676.70 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 04 43 358 9.4 -9 676.70 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 44 358 9.6 -9 676.60 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 45 358 9.6 -9 676.70 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 46 358 9.9 -9 676.70 -52.5 -52.2 -52.6 68 -99 SPO 1997 04 30 04 47 357 9.7 -9 676.70 -52.5 -52.1 -52.5 69 -99 SPO 1997 04 30 04 48 357 9.4 -9 676.80 -52.4 -52.1 -52.5 67 -99 SPO 1997 04 30 04 49 357 9.1 -9 676.80 -52.4 -52.1 -52.5 66 -99 SPO 1997 04 30 04 50 357 8.9 -9 676.90 -52.4 -52.1 -52.5 66 -99 SPO 1997 04 30 04 51 357 9.0 -9 676.90 -52.4 -52.2 -52.5 65 -99 SPO 1997 04 30 04 52 358 8.8 -9 676.90 -52.4 -52.2 -52.6 65 -99 SPO 1997 04 30 04 53 359 9.2 -9 676.90 -52.4 -52.2 -52.6 65 -99 SPO 1997 04 30 04 54 358 9.3 -9 676.90 -52.4 -52.2 -52.5 65 -99 SPO 1997 04 30 04 55 359 8.7 -9 676.90 -52.4 -52.2 -52.6 65 -99 SPO 1997 04 30 04 56 359 9.1 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 04 57 358 9.4 -9 676.90 -52.5 -52.2 -52.5 67 -99 SPO 1997 04 30 04 58 359 9.2 -9 676.90 -52.4 -52.2 -52.5 67 -99 SPO 1997 04 30 04 59 359 9.3 -9 676.90 -52.4 -52.2 -52.5 67 -99 SPO 1997 04 30 05 00 358 9.3 -9 676.90 -52.4 -52.2 -52.5 67 0 SPO 1997 04 30 05 01 358 9.5 -9 676.90 -52.4 -52.2 -52.5 67 -99 SPO 1997 04 30 05 02 358 9.5 -9 676.90 -52.4 -52.1 -52.5 66 -99 SPO 1997 04 30 05 03 359 9.5 -9 676.90 -52.4 -52.1 -52.5 65 -99 SPO 1997 04 30 05 04 359 9.5 -9 676.90 -52.4 -52.1 -52.5 65 -99 SPO 1997 04 30 05 05 359 9.3 -9 676.90 -52.4 -52.1 -52.6 65 -99 SPO 1997 04 30 05 06 360 9.8 -9 676.90 -52.5 -52.1 -52.6 66 -99 SPO 1997 04 30 05 07 359 9.5 -9 676.90 -52.5 -52.1 -52.6 66 -99 SPO 1997 04 30 05 08 360 9.4 -9 676.90 -52.5 -52.1 -52.6 66 -99 SPO 1997 04 30 05 09 1 9.3 -9 676.90 -52.5 -52.2 -52.6 67 -99 SPO 1997 04 30 05 10 360 9.3 -9 676.90 -52.5 -52.2 -52.6 67 -99 SPO 1997 04 30 05 11 0 9.3 -9 676.90 -52.5 -52.2 -52.6 67 -99 SPO 1997 04 30 05 12 1 9.3 -9 676.90 -52.5 -52.2 -52.6 67 -99 SPO 1997 04 30 05 13 1 9.2 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 05 14 1 9.1 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 05 15 360 9.1 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 05 16 0 9.2 -9 676.90 -52.5 -52.2 -52.6 65 -99 SPO 1997 04 30 05 17 0 9.2 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 05 18 360 9.4 -9 676.90 -52.5 -52.2 -52.6 66 -99 SPO 1997 04 30 05 19 359 9.5 -9 676.90 -52.5 -52.1 -52.6 66 -99 SPO 1997 04 30 05 20 359 9.5 -9 676.90 -52.5 -52.1 -52.6 66 -99 SPO 1997 04 30 05 21 359 9.4 -9 677.00 -52.5 -52.0 -52.6 67 -99 SPO 1997 04 30 05 22 359 9.3 -9 677.00 -52.5 -52.0 -52.6 67 -99 SPO 1997 04 30 05 23 358 9.3 -9 677.00 -52.5 -52.0 -52.6 67 -99 SPO 1997 04 30 05 24 358 9.2 -9 677.00 -52.5 -52.0 -52.6 66 -99 SPO 1997 04 30 05 25 358 9.2 -9 677.00 -52.5 -52.0 -52.6 65 -99 SPO 1997 04 30 05 26 359 9.2 -9 676.90 -52.5 -52.0 -52.6 65 -99 SPO 1997 04 30 05 27 360 9.2 -9 676.90 -52.5 -52.0 -52.6 65 -99 SPO 1997 04 30 05 28 359 9.4 -9 676.90 -52.5 -52.0 -52.6 65 -99 SPO 1997 04 30 05 29 359 9.2 -9 676.90 -52.5 -52.0 -52.7 65 -99 SPO 1997 04 30 05 30 1 9.3 -9 676.90 -52.5 -52.0 -52.6 66 -99 SPO 1997 04 30 05 31 0 9.3 -9 676.90 -52.6 -52.0 -52.6 67 -99 SPO 1997 04 30 05 32 360 9.2 -9 676.90 -52.6 -51.9 -52.7 68 -99 SPO 1997 04 30 05 33 0 9.2 -9 676.90 -52.6 -51.9 -52.6 68 -99 SPO 1997 04 30 05 34 360 9.2 -9 677.00 -52.5 -51.9 -52.6 68 -99 SPO 1997 04 30 05 35 359 9.3 -9 677.00 -52.5 -51.9 -52.6 68 -99 SPO 1997 04 30 05 36 360 9.1 -9 677.00 -52.5 -51.9 -52.6 67 -99 SPO 1997 04 30 05 37 360 9.1 -9 677.00 -52.5 -51.8 -52.6 66 -99 SPO 1997 04 30 05 38 359 9.1 -9 677.00 -52.5 -51.8 -52.6 65 -99 SPO 1997 04 30 05 39 358 9.1 -9 677.00 -52.5 -51.8 -52.6 65 -99 SPO 1997 04 30 05 40 358 9.1 -9 677.00 -52.5 -51.8 -52.5 65 -99 SPO 1997 04 30 05 41 358 8.9 -9 677.00 -52.4 -51.8 -52.5 65 -99 SPO 1997 04 30 05 42 359 9.0 -9 677.00 -52.5 -51.8 -52.6 66 -99 SPO 1997 04 30 05 43 359 8.8 -9 677.00 -52.5 -51.8 -52.6 67 -99 SPO 1997 04 30 05 44 358 8.8 -9 677.00 -52.5 -51.8 -52.6 67 -99 SPO 1997 04 30 05 45 359 8.8 -9 677.00 -52.5 -51.9 -52.6 67 -99 SPO 1997 04 30 05 46 358 8.7 -9 677.00 -52.5 -51.8 -52.6 67 -99 SPO 1997 04 30 05 47 358 8.8 -9 677.10 -52.5 -51.9 -52.6 67 -99 SPO 1997 04 30 05 48 358 8.7 -9 677.10 -52.6 -51.9 -52.6 67 -99 SPO 1997 04 30 05 49 357 8.6 -9 677.10 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 30 05 50 358 8.7 -9 677.00 -52.5 -51.9 -52.6 65 -99 SPO 1997 04 30 05 51 358 8.8 -9 677.00 -52.6 -51.9 -52.6 65 -99 SPO 1997 04 30 05 52 358 8.6 -9 677.00 -52.5 -51.9 -52.6 65 -99 SPO 1997 04 30 05 53 357 8.6 -9 677.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 30 05 54 358 8.4 -9 677.00 -52.6 -51.9 -52.6 67 -99 SPO 1997 04 30 05 55 357 8.5 -9 677.00 -52.6 -51.9 -52.6 67 -99 SPO 1997 04 30 05 56 356 8.6 -9 677.00 -52.6 -52.0 -52.6 67 -99 SPO 1997 04 30 05 57 356 8.8 -9 677.00 -52.6 -52.0 -52.6 67 -99 SPO 1997 04 30 05 58 357 8.8 -9 677.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 30 05 59 356 9.0 -9 677.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 30 06 00 355 8.7 -9 677.00 -52.5 -52.0 -52.6 66 0 SPO 1997 04 30 06 01 355 8.7 -9 677.00 -52.5 -52.0 -52.6 66 -99 SPO 1997 04 30 06 02 355 8.8 -9 677.00 -52.5 -52.0 -52.6 65 -99 SPO 1997 04 30 06 03 355 8.9 -9 677.00 -52.5 -51.9 -52.6 66 -99 SPO 1997 04 30 06 04 355 9.0 -9 677.00 -52.5 -52.0 -52.6 66 -99 SPO 1997 04 30 06 05 354 8.9 -9 677.00 -52.5 -52.0 -52.6 67 -99 SPO 1997 04 30 06 06 354 9.1 -9 677.00 -52.5 -52.0 -52.6 67 -99 SPO 1997 04 30 06 07 353 9.2 -9 677.00 -52.5 -52.0 -52.6 68 -99 SPO 1997 04 30 06 08 353 9.1 -9 677.00 -52.5 -52.0 -52.6 68 -99 SPO 1997 04 30 06 09 353 9.0 -9 677.00 -52.5 -52.0 -52.6 68 -99 SPO 1997 04 30 06 10 354 9.0 -9 677.00 -52.5 -52.0 -52.6 68 -99 SPO 1997 04 30 06 11 353 8.8 -9 677.00 -52.5 -52.0 -52.7 67 -99 SPO 1997 04 30 06 12 354 9.1 -9 677.00 -52.6 -52.1 -52.7 68 -99 SPO 1997 04 30 06 13 353 9.2 -9 676.90 -52.6 -52.1 -52.6 67 -99 SPO 1997 04 30 06 14 354 9.1 -9 676.90 -52.6 -52.1 -52.7 67 -99 SPO 1997 04 30 06 15 355 9.2 -9 676.90 -52.6 -52.1 -52.7 66 -99 SPO 1997 04 30 06 16 355 9.5 -9 676.90 -52.6 -52.2 -52.7 66 -99 SPO 1997 04 30 06 17 356 9.2 -9 676.90 -52.6 -52.2 -52.7 67 -99 SPO 1997 04 30 06 18 356 9.3 -9 676.90 -52.6 -52.3 -52.7 68 -99 SPO 1997 04 30 06 19 357 9.3 -9 676.90 -52.6 -52.3 -52.7 68 -99 SPO 1997 04 30 06 20 358 9.3 -9 676.90 -52.6 -52.3 -52.8 67 -99 SPO 1997 04 30 06 21 359 9.0 -9 676.90 -52.7 -52.4 -52.8 68 -99 SPO 1997 04 30 06 22 359 9.1 -9 676.90 -52.8 -52.4 -52.9 69 -99 SPO 1997 04 30 06 23 358 8.9 -9 676.90 -52.8 -52.4 -52.9 68 -99 SPO 1997 04 30 06 24 358 9.0 -9 677.00 -52.8 -52.4 -52.9 67 -99 SPO 1997 04 30 06 25 359 8.9 -9 677.00 -52.8 -52.4 -52.9 67 -99 SPO 1997 04 30 06 26 359 8.8 -9 677.00 -52.9 -52.4 -53.0 67 -99 SPO 1997 04 30 06 27 360 8.5 -9 677.00 -52.9 -52.5 -53.1 66 -99 SPO 1997 04 30 06 28 359 8.8 -9 677.00 -53.0 -52.5 -53.1 67 -99 SPO 1997 04 30 06 29 359 9.0 -9 677.00 -53.0 -52.5 -53.1 67 -99 SPO 1997 04 30 06 30 0 9.3 -9 677.00 -53.0 -52.5 -53.0 68 -99 SPO 1997 04 30 06 31 360 9.1 -9 677.00 -53.0 -52.5 -53.0 67 -99 SPO 1997 04 30 06 32 359 9.2 -9 677.00 -53.0 -52.5 -53.1 67 -99 SPO 1997 04 30 06 33 0 9.1 -9 677.00 -53.0 -52.5 -53.1 66 -99 SPO 1997 04 30 06 34 0 9.2 -9 677.00 -53.0 -52.6 -53.1 65 -99 SPO 1997 04 30 06 35 359 9.3 -9 677.00 -53.0 -52.6 -53.1 65 -99 SPO 1997 04 30 06 36 358 9.1 -9 677.00 -53.0 -52.6 -53.1 64 -99 SPO 1997 04 30 06 37 359 9.0 -9 677.00 -53.0 -52.7 -53.2 64 -99 SPO 1997 04 30 06 38 359 9.1 -9 677.00 -53.1 -52.7 -53.2 64 -99 SPO 1997 04 30 06 39 360 9.2 -9 677.00 -53.1 -52.6 -53.2 64 -99 SPO 1997 04 30 06 40 358 9.5 -9 677.00 -53.1 -52.6 -53.2 65 -99 SPO 1997 04 30 06 41 358 9.7 -9 677.00 -53.1 -52.6 -53.1 66 -99 SPO 1997 04 30 06 42 359 9.7 -9 677.00 -53.1 -52.5 -53.1 68 -99 SPO 1997 04 30 06 43 359 9.7 -9 677.00 -53.0 -52.5 -53.1 67 -99 SPO 1997 04 30 06 44 359 9.6 -9 677.00 -53.0 -52.5 -53.1 68 -99 SPO 1997 04 30 06 45 359 9.7 -9 677.00 -53.0 -52.6 -53.1 68 -99 SPO 1997 04 30 06 46 359 9.4 -9 677.00 -53.0 -52.6 -53.1 67 -99 SPO 1997 04 30 06 47 359 9.6 -9 677.00 -53.0 -52.6 -53.2 66 -99 SPO 1997 04 30 06 48 360 9.4 -9 677.00 -53.1 -52.6 -53.1 66 -99 SPO 1997 04 30 06 49 1 9.7 -9 677.00 -53.1 -52.6 -53.2 65 -99 SPO 1997 04 30 06 50 1 9.8 -9 677.00 -53.1 -52.6 -53.2 65 -99 SPO 1997 04 30 06 51 360 9.6 -9 677.00 -53.1 -52.6 -53.2 65 -99 SPO 1997 04 30 06 52 359 9.7 -9 677.10 -53.1 -52.6 -53.2 65 -99 SPO 1997 04 30 06 53 359 9.4 -9 677.10 -53.1 -52.6 -53.2 66 -99 SPO 1997 04 30 06 54 359 9.6 -9 677.10 -53.1 -52.5 -53.2 66 -99 SPO 1997 04 30 06 55 357 9.2 -9 677.10 -53.1 -52.5 -53.2 66 -99 SPO 1997 04 30 06 56 360 9.7 -9 677.10 -53.1 -52.5 -53.1 66 -99 SPO 1997 04 30 06 57 3 9.8 -9 677.00 -53.1 -52.4 -53.1 67 -99 SPO 1997 04 30 06 58 2 9.4 -9 677.00 -53.1 -52.4 -53.1 66 -99 SPO 1997 04 30 06 59 2 9.0 -9 677.10 -53.1 -52.5 -53.2 66 -99 SPO 1997 04 30 07 00 0 9.0 -9 677.10 -53.2 -52.6 -53.3 67 0 SPO 1997 04 30 07 01 360 8.9 -9 677.10 -53.2 -52.7 -53.4 66 -99 SPO 1997 04 30 07 02 2 9.2 -9 677.20 -53.2 -52.7 -53.4 66 -99 SPO 1997 04 30 07 03 4 9.2 -9 677.10 -53.2 -52.7 -53.3 66 -99 SPO 1997 04 30 07 04 4 9.2 -9 677.10 -53.2 -52.6 -53.3 66 -99 SPO 1997 04 30 07 05 2 8.8 -9 677.20 -53.3 -52.7 -53.4 67 -99 SPO 1997 04 30 07 06 1 8.6 -9 677.20 -53.3 -52.7 -53.4 66 -99 SPO 1997 04 30 07 07 359 8.7 -9 677.20 -53.3 -52.8 -53.4 65 -99 SPO 1997 04 30 07 08 1 9.0 -9 677.20 -53.3 -52.8 -53.4 66 -99 SPO 1997 04 30 07 09 2 8.8 -9 677.20 -53.4 -52.9 -53.5 66 -99 SPO 1997 04 30 07 10 2 8.9 -9 677.20 -53.4 -52.9 -53.4 66 -99 SPO 1997 04 30 07 11 3 8.9 -9 677.10 -53.4 -52.9 -53.5 65 -99 SPO 1997 04 30 07 12 1 8.9 -9 677.10 -53.4 -53.0 -53.5 65 -99 SPO 1997 04 30 07 13 1 9.0 -9 677.20 -53.4 -53.0 -53.5 64 -99 SPO 1997 04 30 07 14 4 9.1 -9 677.20 -53.5 -53.0 -53.5 66 -99 SPO 1997 04 30 07 15 4 9.3 -9 677.20 -53.4 -53.0 -53.5 65 -99 SPO 1997 04 30 07 16 2 9.0 -9 677.20 -53.5 -53.0 -53.5 66 -99 SPO 1997 04 30 07 17 1 9.1 -9 677.20 -53.5 -52.9 -53.5 67 -99 SPO 1997 04 30 07 18 2 9.3 -9 677.20 -53.4 -52.9 -53.5 66 -99 SPO 1997 04 30 07 19 2 9.1 -9 677.20 -53.4 -52.9 -53.5 66 -99 SPO 1997 04 30 07 20 3 9.3 -9 677.20 -53.4 -52.9 -53.5 66 -99 SPO 1997 04 30 07 21 3 9.3 -9 677.20 -53.4 -52.9 -53.5 65 -99 SPO 1997 04 30 07 22 2 9.4 -9 677.20 -53.4 -52.9 -53.5 64 -99 SPO 1997 04 30 07 23 2 9.3 -9 677.20 -53.4 -52.9 -53.6 64 -99 SPO 1997 04 30 07 24 2 9.4 -9 677.30 -53.4 -52.9 -53.5 64 -99 SPO 1997 04 30 07 25 1 9.5 -9 677.30 -53.5 -53.0 -53.6 64 -99 SPO 1997 04 30 07 26 1 9.4 -9 677.30 -53.5 -53.0 -53.6 65 -99 SPO 1997 04 30 07 27 360 9.7 -9 677.30 -53.5 -53.0 -53.6 65 -99 SPO 1997 04 30 07 28 0 9.6 -9 677.30 -53.5 -53.0 -53.6 65 -99 SPO 1997 04 30 07 29 360 9.9 -9 677.20 -53.5 -53.0 -53.6 65 -99 SPO 1997 04 30 07 30 360 9.7 -9 677.20 -53.6 -53.0 -53.6 66 -99 SPO 1997 04 30 07 31 360 9.6 -9 677.20 -53.6 -53.0 -53.6 66 -99 SPO 1997 04 30 07 32 359 9.6 -9 677.20 -53.6 -53.0 -53.7 66 -99 SPO 1997 04 30 07 33 360 9.8 -9 677.20 -53.6 -53.0 -53.7 65 -99 SPO 1997 04 30 07 34 360 9.8 -9 677.20 -53.6 -53.0 -53.7 65 -99 SPO 1997 04 30 07 35 360 9.9 -9 677.20 -53.6 -52.9 -53.7 64 -99 SPO 1997 04 30 07 36 359 9.5 -9 677.20 -53.6 -52.9 -53.7 64 -99 SPO 1997 04 30 07 37 360 9.6 -9 677.30 -53.6 -52.9 -53.7 64 -99 SPO 1997 04 30 07 38 0 9.3 -9 677.30 -53.7 -52.9 -53.8 66 -99 SPO 1997 04 30 07 39 360 9.4 -9 677.30 -53.7 -52.9 -53.8 66 -99 SPO 1997 04 30 07 40 359 9.2 -9 677.30 -53.7 -53.0 -53.8 66 -99 SPO 1997 04 30 07 41 359 9.3 -9 677.30 -53.7 -53.0 -53.8 66 -99 SPO 1997 04 30 07 42 360 9.4 -9 677.30 -53.7 -53.1 -53.8 66 -99 SPO 1997 04 30 07 43 359 9.3 -9 677.30 -53.8 -53.1 -53.9 67 -99 SPO 1997 04 30 07 44 359 9.2 -9 677.30 -53.8 -53.1 -53.9 66 -99 SPO 1997 04 30 07 45 358 9.2 -9 677.30 -53.8 -53.2 -53.9 65 -99 SPO 1997 04 30 07 46 359 9.4 -9 677.30 -53.9 -53.1 -53.9 65 -99 SPO 1997 04 30 07 47 359 9.3 -9 677.30 -53.9 -53.1 -54.0 64 -99 SPO 1997 04 30 07 48 359 9.3 -9 677.30 -53.9 -53.2 -53.9 64 -99 SPO 1997 04 30 07 49 359 9.4 -9 677.30 -53.9 -53.2 -54.0 64 -99 SPO 1997 04 30 07 50 359 9.5 -9 677.30 -53.9 -53.1 -54.1 65 -99 SPO 1997 04 30 07 51 359 9.6 -9 677.30 -54.0 -53.1 -54.1 66 -99 SPO 1997 04 30 07 52 359 9.7 -9 677.20 -54.0 -53.1 -54.1 66 -99 SPO 1997 04 30 07 53 359 9.6 -9 677.20 -54.0 -53.0 -54.1 66 -99 SPO 1997 04 30 07 54 359 9.5 -9 677.30 -54.0 -53.0 -54.1 66 -99 SPO 1997 04 30 07 55 359 9.5 -9 677.30 -54.0 -53.0 -54.1 65 -99 SPO 1997 04 30 07 56 359 9.4 -9 677.30 -54.0 -53.0 -54.1 65 -99 SPO 1997 04 30 07 57 359 9.2 -9 677.30 -54.0 -53.1 -54.1 63 -99 SPO 1997 04 30 07 58 359 9.4 -9 677.30 -54.0 -53.2 -54.1 63 -99 SPO 1997 04 30 07 59 358 9.5 -9 677.30 -54.1 -53.2 -54.2 64 -99 SPO 1997 04 30 08 00 357 9.2 -9 677.30 -54.1 -53.2 -54.2 65 0 SPO 1997 04 30 08 01 358 9.5 -9 677.30 -54.1 -53.2 -54.2 65 -99 SPO 1997 04 30 08 02 358 9.3 -9 677.30 -54.1 -53.2 -54.2 66 -99 SPO 1997 04 30 08 03 358 9.4 -9 677.30 -54.1 -53.2 -54.2 66 -99 SPO 1997 04 30 08 04 358 9.6 -9 677.30 -54.1 -53.2 -54.2 66 -99 SPO 1997 04 30 08 05 360 9.6 -9 677.30 -54.2 -53.1 -54.2 66 -99 SPO 1997 04 30 08 06 359 9.4 -9 677.30 -54.1 -53.1 -54.2 65 -99 SPO 1997 04 30 08 07 358 9.3 -9 677.30 -54.1 -53.1 -54.2 65 -99 SPO 1997 04 30 08 08 358 9.2 -9 677.30 -54.1 -53.2 -54.2 65 -99 SPO 1997 04 30 08 09 358 9.0 -9 677.30 -54.1 -53.2 -54.2 64 -99 SPO 1997 04 30 08 10 358 9.2 -9 677.30 -54.2 -53.2 -54.2 65 -99 SPO 1997 04 30 08 11 358 9.4 -9 677.30 -54.2 -53.2 -54.3 65 -99 SPO 1997 04 30 08 12 358 9.2 -9 677.30 -54.2 -53.2 -54.3 65 -99 SPO 1997 04 30 08 13 359 9.2 -9 677.30 -54.2 -53.2 -54.2 66 -99 SPO 1997 04 30 08 14 358 9.3 -9 677.30 -54.2 -53.2 -54.3 66 -99 SPO 1997 04 30 08 15 358 9.5 -9 677.30 -54.2 -53.2 -54.3 66 -99 SPO 1997 04 30 08 16 357 9.1 -9 677.40 -54.2 -53.3 -54.2 67 -99 SPO 1997 04 30 08 17 357 9.1 -9 677.40 -54.2 -53.3 -54.2 67 -99 SPO 1997 04 30 08 18 359 8.8 -9 677.30 -54.2 -53.3 -54.3 67 -99 SPO 1997 04 30 08 19 357 8.8 -9 677.40 -54.2 -53.3 -54.3 67 -99 SPO 1997 04 30 08 20 357 8.5 -9 677.40 -54.2 -53.4 -54.4 66 -99 SPO 1997 04 30 08 21 358 8.6 -9 677.40 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 22 0 8.7 -9 677.40 -54.3 -53.4 -54.3 66 -99 SPO 1997 04 30 08 23 360 8.6 -9 677.40 -54.3 -53.3 -54.4 65 -99 SPO 1997 04 30 08 24 1 8.7 -9 677.40 -54.3 -53.3 -54.4 65 -99 SPO 1997 04 30 08 25 360 8.2 -9 677.40 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 26 1 8.4 -9 677.50 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 27 0 8.3 -9 677.50 -54.3 -53.3 -54.4 66 -99 SPO 1997 04 30 08 28 360 8.4 -9 677.50 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 29 360 8.4 -9 677.50 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 30 0 8.4 -9 677.50 -54.3 -53.4 -54.3 66 -99 SPO 1997 04 30 08 31 0 8.5 -9 677.50 -54.3 -53.3 -54.3 63 -99 SPO 1997 04 30 08 32 359 8.4 -9 677.50 -54.3 -53.4 -54.3 63 -99 SPO 1997 04 30 08 33 359 8.4 -9 677.50 -54.3 -53.4 -54.4 63 -99 SPO 1997 04 30 08 34 1 8.6 -9 677.50 -54.3 -53.4 -54.3 63 -99 SPO 1997 04 30 08 35 2 8.7 -9 677.50 -54.3 -53.4 -54.3 65 -99 SPO 1997 04 30 08 36 1 8.7 -9 677.50 -54.2 -53.4 -54.3 64 -99 SPO 1997 04 30 08 37 1 8.7 -9 677.50 -54.2 -53.4 -54.4 65 -99 SPO 1997 04 30 08 38 1 8.8 -9 677.50 -54.3 -53.5 -54.4 66 -99 SPO 1997 04 30 08 39 1 8.9 -9 677.50 -54.3 -53.5 -54.4 66 -99 SPO 1997 04 30 08 40 1 8.9 -9 677.50 -54.3 -53.4 -54.4 66 -99 SPO 1997 04 30 08 41 0 8.9 -9 677.50 -54.3 -53.4 -54.4 65 -99 SPO 1997 04 30 08 42 359 8.9 -9 677.50 -54.3 -53.4 -54.4 63 -99 SPO 1997 04 30 08 43 359 9.0 -9 677.50 -54.4 -53.4 -54.5 63 -99 SPO 1997 04 30 08 44 360 9.1 -9 677.50 -54.4 -53.4 -54.4 63 -99 SPO 1997 04 30 08 45 360 9.0 -9 677.40 -54.4 -53.4 -54.5 63 -99 SPO 1997 04 30 08 46 359 9.1 -9 677.40 -54.4 -53.4 -54.6 63 -99 SPO 1997 04 30 08 47 359 9.1 -9 677.40 -54.5 -53.4 -54.5 64 -99 SPO 1997 04 30 08 48 359 9.3 -9 677.40 -54.5 -53.4 -54.6 64 -99 SPO 1997 04 30 08 49 358 9.2 -9 677.40 -54.5 -53.4 -54.6 64 -99 SPO 1997 04 30 08 50 358 9.3 -9 677.40 -54.5 -53.5 -54.6 64 -99 SPO 1997 04 30 08 51 358 9.1 -9 677.40 -54.5 -53.5 -54.6 64 -99 SPO 1997 04 30 08 52 358 9.0 -9 677.40 -54.6 -53.5 -54.6 65 -99 SPO 1997 04 30 08 53 358 9.1 -9 677.40 -54.6 -53.6 -54.7 64 -99 SPO 1997 04 30 08 54 358 9.1 -9 677.40 -54.6 -53.5 -54.8 63 -99 SPO 1997 04 30 08 55 358 8.9 -9 677.40 -54.7 -53.5 -54.8 64 -99 SPO 1997 04 30 08 56 358 9.0 -9 677.40 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 08 57 358 8.9 -9 677.40 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 08 58 358 8.9 -9 677.40 -54.7 -53.5 -54.8 64 -99 SPO 1997 04 30 08 59 357 8.8 -9 677.40 -54.7 -53.5 -54.8 65 -99 SPO 1997 04 30 09 00 357 8.8 -9 677.40 -54.7 -53.5 -54.8 65 0 SPO 1997 04 30 09 01 356 8.7 -9 677.40 -54.7 -53.5 -54.8 65 -99 SPO 1997 04 30 09 02 356 8.4 -9 677.50 -54.7 -53.5 -54.8 65 -99 SPO 1997 04 30 09 03 356 8.5 -9 677.50 -54.8 -53.5 -54.8 65 -99 SPO 1997 04 30 09 04 356 8.6 -9 677.50 -54.8 -53.6 -54.8 64 -99 SPO 1997 04 30 09 05 355 8.6 -9 677.50 -54.7 -53.6 -54.8 63 -99 SPO 1997 04 30 09 06 356 8.5 -9 677.50 -54.7 -53.6 -54.8 63 -99 SPO 1997 04 30 09 07 355 8.7 -9 677.50 -54.7 -53.6 -54.8 63 -99 SPO 1997 04 30 09 08 356 8.8 -9 677.50 -54.7 -53.6 -54.8 63 -99 SPO 1997 04 30 09 09 356 8.8 -9 677.50 -54.7 -53.6 -54.8 63 -99 SPO 1997 04 30 09 10 357 8.8 -9 677.50 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 09 11 357 8.7 -9 677.50 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 09 12 357 9.0 -9 677.50 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 09 13 357 9.0 -9 677.40 -54.7 -53.5 -54.8 63 -99 SPO 1997 04 30 09 14 358 9.1 -9 677.40 -54.7 -53.4 -54.8 64 -99 SPO 1997 04 30 09 15 358 9.1 -9 677.40 -54.8 -53.4 -54.8 65 -99 SPO 1997 04 30 09 16 358 9.1 -9 677.50 -54.8 -53.4 -54.9 64 -99 SPO 1997 04 30 09 17 359 9.1 -9 677.50 -54.8 -53.4 -54.8 64 -99 SPO 1997 04 30 09 18 358 8.8 -9 677.50 -54.8 -53.4 -54.9 63 -99 SPO 1997 04 30 09 19 358 8.7 -9 677.50 -54.9 -53.4 -55.0 63 -99 SPO 1997 04 30 09 20 358 8.8 -9 677.50 -54.8 -53.4 -54.9 62 -99 SPO 1997 04 30 09 21 358 8.8 -9 677.50 -54.9 -53.4 -54.9 63 -99 SPO 1997 04 30 09 22 358 8.8 -9 677.50 -54.9 -53.5 -54.9 64 -99 SPO 1997 04 30 09 23 357 8.8 -9 677.50 -54.8 -53.5 -54.9 64 -99 SPO 1997 04 30 09 24 358 8.9 -9 677.50 -54.8 -53.5 -54.9 64 -99 SPO 1997 04 30 09 25 358 8.8 -9 677.50 -54.9 -53.5 -55.0 65 -99 SPO 1997 04 30 09 26 359 8.8 -9 677.50 -54.9 -53.5 -55.0 65 -99 SPO 1997 04 30 09 27 359 9.1 -9 677.50 -54.9 -53.4 -55.0 65 -99 SPO 1997 04 30 09 28 359 9.1 -9 677.40 -54.9 -53.4 -55.0 64 -99 SPO 1997 04 30 09 29 358 9.2 -9 677.40 -54.9 -53.4 -55.0 64 -99 SPO 1997 04 30 09 30 359 9.4 -9 677.40 -54.9 -53.4 -55.0 64 -99 SPO 1997 04 30 09 31 359 9.5 -9 677.40 -54.9 -53.3 -54.9 65 -99 SPO 1997 04 30 09 32 358 9.6 -9 677.40 -54.8 -53.3 -54.9 64 -99 SPO 1997 04 30 09 33 358 9.3 -9 677.40 -54.8 -53.4 -54.9 64 -99 SPO 1997 04 30 09 34 358 9.6 -9 677.40 -54.8 -53.4 -54.9 65 -99 SPO 1997 04 30 09 35 358 9.4 -9 677.40 -54.8 -53.4 -54.9 65 -99 SPO 1997 04 30 09 36 359 9.5 -9 677.40 -54.8 -53.4 -54.8 66 -99 SPO 1997 04 30 09 37 359 9.4 -9 677.40 -54.8 -53.4 -54.9 65 -99 SPO 1997 04 30 09 38 359 9.3 -9 677.40 -54.8 -53.4 -54.9 64 -99 SPO 1997 04 30 09 39 359 9.2 -9 677.40 -54.8 -53.4 -54.9 64 -99 SPO 1997 04 30 09 40 360 9.2 -9 677.50 -54.8 -53.5 -55.0 64 -99 SPO 1997 04 30 09 41 359 9.3 -9 677.50 -54.8 -53.5 -54.9 64 -99 SPO 1997 04 30 09 42 359 9.2 -9 677.50 -54.8 -53.6 -54.9 63 -99 SPO 1997 04 30 09 43 359 9.1 -9 677.50 -54.9 -53.5 -55.0 64 -99 SPO 1997 04 30 09 44 359 9.2 -9 677.50 -54.9 -53.5 -55.0 64 -99 SPO 1997 04 30 09 45 360 9.0 -9 677.50 -54.9 -53.5 -55.0 64 -99 SPO 1997 04 30 09 46 360 8.9 -9 677.50 -54.9 -53.5 -55.0 65 -99 SPO 1997 04 30 09 47 0 9.2 -9 677.50 -54.9 -53.5 -55.0 66 -99 SPO 1997 04 30 09 48 359 9.1 -9 677.50 -54.9 -53.4 -55.0 66 -99 SPO 1997 04 30 09 49 358 9.2 -9 677.50 -54.9 -53.4 -54.9 66 -99 SPO 1997 04 30 09 50 358 9.2 -9 677.50 -54.9 -53.4 -54.9 65 -99 SPO 1997 04 30 09 51 358 9.3 -9 677.50 -54.9 -53.4 -55.0 65 -99 SPO 1997 04 30 09 52 359 9.4 -9 677.50 -54.9 -53.3 -55.0 64 -99 SPO 1997 04 30 09 53 359 9.5 -9 677.40 -54.8 -53.2 -54.9 63 -99 SPO 1997 04 30 09 54 359 9.7 -9 677.40 -54.8 -53.2 -54.9 62 -99 SPO 1997 04 30 09 55 359 9.8 -9 677.40 -54.9 -53.2 -54.9 64 -99 SPO 1997 04 30 09 56 359 9.9 -9 677.40 -54.9 -53.3 -54.9 65 -99 SPO 1997 04 30 09 57 359 9.9 -9 677.40 -54.8 -53.3 -54.9 64 -99 SPO 1997 04 30 09 58 359 9.9 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 09 59 359 10.0 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 00 358 10.0 -9 677.40 -54.8 -53.2 -54.9 64 0 SPO 1997 04 30 10 01 358 9.9 -9 677.40 -54.8 -53.1 -54.9 64 -99 SPO 1997 04 30 10 02 358 9.8 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 03 359 9.9 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 04 359 9.9 -9 677.40 -54.8 -53.2 -54.8 63 -99 SPO 1997 04 30 10 05 359 9.9 -9 677.40 -54.8 -53.2 -54.8 63 -99 SPO 1997 04 30 10 06 358 9.9 -9 677.40 -54.8 -53.2 -54.8 64 -99 SPO 1997 04 30 10 07 358 9.8 -9 677.40 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 08 358 9.8 -9 677.40 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 09 358 9.8 -9 677.40 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 10 358 9.8 -9 677.40 -54.8 -53.2 -54.8 64 -99 SPO 1997 04 30 10 11 357 9.8 -9 677.40 -54.8 -53.2 -54.8 64 -99 SPO 1997 04 30 10 12 357 9.6 -9 677.40 -54.7 -53.3 -54.8 63 -99 SPO 1997 04 30 10 13 356 9.6 -9 677.40 -54.8 -53.4 -54.8 64 -99 SPO 1997 04 30 10 14 357 9.8 -9 677.40 -54.7 -53.4 -54.8 63 -99 SPO 1997 04 30 10 15 357 9.7 -9 677.40 -54.7 -53.4 -54.8 62 -99 SPO 1997 04 30 10 16 357 9.9 -9 677.40 -54.7 -53.3 -54.8 63 -99 SPO 1997 04 30 10 17 356 9.8 -9 677.40 -54.8 -53.3 -54.8 64 -99 SPO 1997 04 30 10 18 357 10.0 -9 677.40 -54.8 -53.3 -54.9 64 -99 SPO 1997 04 30 10 19 356 9.7 -9 677.40 -54.8 -53.3 -54.8 64 -99 SPO 1997 04 30 10 20 356 9.8 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 21 357 9.8 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 22 356 10.0 -9 677.40 -54.8 -53.2 -54.9 64 -99 SPO 1997 04 30 10 23 356 10.0 -9 677.30 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 24 355 10.0 -9 677.30 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 25 355 9.9 -9 677.40 -54.8 -53.0 -54.8 64 -99 SPO 1997 04 30 10 26 355 10.0 -9 677.40 -54.8 -53.1 -54.8 64 -99 SPO 1997 04 30 10 27 355 10.0 -9 677.40 -54.8 -53.1 -54.8 62 -99 SPO 1997 04 30 10 28 355 10.1 -9 677.30 -54.8 -53.1 -54.9 61 -99 SPO 1997 04 30 10 29 355 10.0 -9 677.30 -54.8 -53.1 -54.9 61 -99 SPO 1997 04 30 10 30 356 10.1 -9 677.30 -54.8 -53.1 -54.9 62 -99 SPO 1997 04 30 10 31 355 10.0 -9 677.30 -54.8 -53.1 -54.9 62 -99 SPO 1997 04 30 10 32 356 10.0 -9 677.30 -54.8 -53.2 -54.9 62 -99 SPO 1997 04 30 10 33 356 10.2 -9 677.40 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 30 10 34 356 9.9 -9 677.40 -54.8 -53.1 -54.8 62 -99 SPO 1997 04 30 10 35 356 9.8 -9 677.30 -54.8 -53.1 -54.9 62 -99 SPO 1997 04 30 10 36 356 9.8 -9 677.30 -54.8 -53.2 -54.9 62 -99 SPO 1997 04 30 10 37 356 10.0 -9 677.30 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 30 10 38 356 9.9 -9 677.30 -54.8 -53.2 -54.8 62 -99 SPO 1997 04 30 10 39 357 10.0 -9 677.30 -54.8 -53.2 -54.9 62 -99 SPO 1997 04 30 10 40 357 9.9 -9 677.30 -54.8 -53.2 -54.9 62 -99 SPO 1997 04 30 10 41 357 10.0 -9 677.30 -54.8 -53.1 -54.9 62 -99 SPO 1997 04 30 10 42 357 10.0 -9 677.30 -54.8 -53.0 -54.9 62 -99 SPO 1997 04 30 10 43 357 10.1 -9 677.30 -54.8 -53.0 -54.9 62 -99 SPO 1997 04 30 10 44 357 10.2 -9 677.30 -54.8 -53.0 -54.8 62 -99 SPO 1997 04 30 10 45 357 10.2 -9 677.30 -54.8 -53.1 -54.8 62 -99 SPO 1997 04 30 10 46 357 10.1 -9 677.30 -54.8 -53.1 -54.9 62 -99 SPO 1997 04 30 10 47 357 9.9 -9 677.30 -54.8 -53.2 -54.9 63 -99 SPO 1997 04 30 10 48 358 10.3 -9 677.30 -54.8 -53.3 -54.9 62 -99 SPO 1997 04 30 10 49 357 10.1 -9 677.30 -54.8 -53.3 -55.0 62 -99 SPO 1997 04 30 10 50 357 10.1 -9 677.30 -54.9 -53.4 -55.0 62 -99 SPO 1997 04 30 10 51 358 9.9 -9 677.30 -54.9 -53.4 -55.0 62 -99 SPO 1997 04 30 10 52 358 10.0 -9 677.30 -54.9 -53.4 -55.0 62 -99 SPO 1997 04 30 10 53 357 9.8 -9 677.30 -55.0 -53.5 -55.0 63 -99 SPO 1997 04 30 10 54 358 10.1 -9 677.30 -54.9 -53.6 -55.0 62 -99 SPO 1997 04 30 10 55 359 10.2 -9 677.20 -54.9 -53.4 -55.0 63 -99 SPO 1997 04 30 10 56 358 10.1 -9 677.20 -54.9 -53.4 -55.0 63 -99 SPO 1997 04 30 10 57 358 9.9 -9 677.20 -54.9 -53.4 -55.0 63 -99 SPO 1997 04 30 10 58 358 10.1 -9 677.20 -54.9 -53.5 -55.0 63 -99 SPO 1997 04 30 10 59 358 9.9 -9 677.20 -54.9 -53.4 -55.0 63 -99 SPO 1997 04 30 11 00 359 10.2 -9 677.20 -54.8 -53.5 -54.9 62 0 SPO 1997 04 30 11 01 358 10.2 -9 677.20 -54.9 -53.5 -54.9 62 -99 SPO 1997 04 30 11 02 358 10.1 -9 677.20 -54.8 -53.6 -54.9 61 -99 SPO 1997 04 30 11 03 358 9.9 -9 677.20 -54.8 -53.6 -54.9 62 -99 SPO 1997 04 30 11 04 359 9.8 -9 677.30 -54.8 -53.6 -54.9 62 -99 SPO 1997 04 30 11 05 359 9.9 -9 677.20 -54.8 -53.6 -54.8 62 -99 SPO 1997 04 30 11 06 359 9.9 -9 677.20 -54.8 -53.7 -54.8 63 -99 SPO 1997 04 30 11 07 358 9.7 -9 677.20 -54.8 -53.7 -54.8 64 -99 SPO 1997 04 30 11 08 359 9.8 -9 677.20 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 09 359 9.8 -9 677.20 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 10 358 9.8 -9 677.30 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 11 358 9.7 -9 677.30 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 12 358 9.7 -9 677.30 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 13 358 9.4 -9 677.30 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 14 359 9.8 -9 677.30 -54.7 -53.8 -54.8 63 -99 SPO 1997 04 30 11 15 359 10.0 -9 677.20 -54.7 -53.8 -54.8 62 -99 SPO 1997 04 30 11 16 358 9.8 -9 677.20 -54.7 -53.8 -54.8 62 -99 SPO 1997 04 30 11 17 358 9.9 -9 677.30 -54.7 -53.8 -54.7 62 -99 SPO 1997 04 30 11 18 358 9.9 -9 677.30 -54.7 -53.8 -54.7 62 -99 SPO 1997 04 30 11 19 357 9.5 -9 677.30 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 20 357 9.5 -9 677.30 -54.7 -53.8 -54.8 64 -99 SPO 1997 04 30 11 21 357 9.5 -9 677.30 -54.7 -53.9 -54.8 64 -99 SPO 1997 04 30 11 22 357 9.5 -9 677.30 -54.7 -53.9 -54.8 64 -99 SPO 1997 04 30 11 23 358 9.5 -9 677.30 -54.7 -53.9 -54.8 64 -99 SPO 1997 04 30 11 24 358 9.5 -9 677.30 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 25 357 9.7 -9 677.40 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 26 358 9.7 -9 677.40 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 27 358 9.4 -9 677.30 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 28 359 9.8 -9 677.30 -54.7 -53.9 -54.8 63 -99 SPO 1997 04 30 11 29 359 9.7 -9 677.30 -54.7 -53.9 -54.8 64 -99 SPO 1997 04 30 11 30 358 9.4 -9 677.30 -54.7 -53.9 -54.8 64 -99 SPO 1997 04 30 11 31 359 9.7 -9 677.40 -54.8 -53.9 -54.9 65 -99 SPO 1997 04 30 11 32 358 9.6 -9 677.40 -54.8 -53.8 -54.9 65 -99 SPO 1997 04 30 11 33 359 9.4 -9 677.40 -54.8 -53.8 -54.9 64 -99 SPO 1997 04 30 11 34 359 9.7 -9 677.30 -54.8 -53.8 -54.9 64 -99 SPO 1997 04 30 11 35 359 9.6 -9 677.30 -54.8 -53.9 -54.8 63 -99 SPO 1997 04 30 11 36 360 9.6 -9 677.30 -54.8 -54.0 -54.9 63 -99 SPO 1997 04 30 11 37 359 9.4 -9 677.30 -54.8 -54.0 -54.9 63 -99 SPO 1997 04 30 11 38 359 9.4 -9 677.30 -54.8 -54.0 -54.9 62 -99 SPO 1997 04 30 11 39 359 9.4 -9 677.30 -54.8 -54.0 -54.9 62 -99 SPO 1997 04 30 11 40 359 9.2 -9 677.30 -54.8 -54.0 -54.9 63 -99 SPO 1997 04 30 11 41 359 9.1 -9 677.40 -54.8 -54.0 -54.9 63 -99 SPO 1997 04 30 11 42 359 9.2 -9 677.40 -54.8 -54.0 -54.9 64 -99 SPO 1997 04 30 11 43 359 9.2 -9 677.40 -54.8 -54.0 -54.9 64 -99 SPO 1997 04 30 11 44 358 9.1 -9 677.40 -54.8 -54.0 -54.8 64 -99 SPO 1997 04 30 11 45 359 9.3 -9 677.40 -54.8 -54.0 -54.8 65 -99 SPO 1997 04 30 11 46 359 9.3 -9 677.40 -54.8 -54.0 -54.8 65 -99 SPO 1997 04 30 11 47 359 9.4 -9 677.40 -54.8 -54.0 -54.8 64 -99 SPO 1997 04 30 11 48 360 9.2 -9 677.40 -54.8 -54.0 -54.9 64 -99 SPO 1997 04 30 11 49 360 9.3 -9 677.40 -54.8 -54.0 -54.8 63 -99 SPO 1997 04 30 11 50 0 9.1 -9 677.40 -54.8 -54.0 -54.8 62 -99 SPO 1997 04 30 11 51 0 9.3 -9 677.40 -54.8 -54.0 -54.8 62 -99 SPO 1997 04 30 11 52 0 9.1 -9 677.40 -54.8 -54.1 -54.9 63 -99 SPO 1997 04 30 11 53 359 9.2 -9 677.40 -54.8 -54.1 -54.9 64 -99 SPO 1997 04 30 11 54 360 9.1 -9 677.40 -54.8 -54.1 -54.9 65 -99 SPO 1997 04 30 11 55 359 9.3 -9 677.40 -54.8 -54.1 -54.9 65 -99 SPO 1997 04 30 11 56 0 9.3 -9 677.40 -54.8 -54.1 -54.9 65 -99 SPO 1997 04 30 11 57 359 9.3 -9 677.40 -54.8 -54.1 -54.9 66 -99 SPO 1997 04 30 11 58 358 9.0 -9 677.40 -54.8 -54.1 -54.9 65 -99 SPO 1997 04 30 11 59 359 9.1 -9 677.40 -54.8 -54.1 -54.9 64 -99 SPO 1997 04 30 12 00 356 9.1 -9 677.40 -54.8 -54.1 -54.9 64 0 SPO 1997 04 30 12 01 356 9.3 -9 677.40 -54.8 -54.0 -54.9 64 -99 SPO 1997 04 30 12 02 357 9.2 -9 677.30 -54.8 -54.0 -54.8 64 -99 SPO 1997 04 30 12 03 358 9.5 -9 677.40 -54.7 -54.0 -54.8 64 -99 SPO 1997 04 30 12 04 357 9.8 -9 677.30 -54.7 -53.8 -54.6 65 -99 SPO 1997 04 30 12 05 358 9.5 -9 677.40 -54.6 -53.9 -54.7 65 -99 SPO 1997 04 30 12 06 356 9.5 -9 677.40 -54.7 -53.9 -54.8 66 -99 SPO 1997 04 30 12 07 356 9.5 -9 677.40 -54.6 -54.0 -54.7 64 -99 SPO 1997 04 30 12 08 357 9.5 -9 677.40 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 09 357 9.4 -9 677.40 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 10 357 9.2 -9 677.40 -54.7 -54.1 -54.7 65 -99 SPO 1997 04 30 12 11 358 8.9 -9 677.40 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 12 357 9.2 -9 677.50 -54.7 -54.1 -54.8 64 -99 SPO 1997 04 30 12 13 358 9.1 -9 677.50 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 14 357 9.3 -9 677.50 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 15 358 9.2 -9 677.50 -54.7 -54.1 -54.8 65 -99 SPO 1997 04 30 12 16 358 9.6 -9 677.50 -54.6 -54.0 -54.6 65 -99 SPO 1997 04 30 12 17 358 9.5 -9 677.50 -54.6 -53.9 -54.7 65 -99 SPO 1997 04 30 12 18 357 9.3 -9 677.50 -54.6 -53.9 -54.7 66 -99 SPO 1997 04 30 12 19 356 9.4 -9 677.50 -54.6 -53.9 -54.7 66 -99 SPO 1997 04 30 12 20 356 9.3 -9 677.50 -54.6 -53.8 -54.7 66 -99 SPO 1997 04 30 12 21 357 9.3 -9 677.50 -54.6 -53.9 -54.7 65 -99 SPO 1997 04 30 12 22 357 9.3 -9 677.50 -54.6 -54.0 -54.7 64 -99 SPO 1997 04 30 12 23 357 9.4 -9 677.50 -54.6 -54.0 -54.7 63 -99 SPO 1997 04 30 12 24 357 9.3 -9 677.50 -54.6 -54.0 -54.7 63 -99 SPO 1997 04 30 12 25 356 9.3 -9 677.50 -54.6 -54.1 -54.7 63 -99 SPO 1997 04 30 12 26 357 9.5 -9 677.50 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 27 356 9.7 -9 677.50 -54.6 -54.1 -54.7 64 -99 SPO 1997 04 30 12 28 356 9.3 -9 677.50 -54.6 -54.1 -54.6 64 -99 SPO 1997 04 30 12 29 356 9.3 -9 677.50 -54.6 -54.2 -54.7 65 -99 SPO 1997 04 30 12 30 357 9.2 -9 677.50 -54.6 -54.2 -54.7 65 -99 SPO 1997 04 30 12 31 357 9.4 -9 677.60 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 32 357 9.4 -9 677.50 -54.6 -54.2 -54.8 64 -99 SPO 1997 04 30 12 33 357 9.3 -9 677.50 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 34 357 9.2 -9 677.60 -54.6 -54.1 -54.8 64 -99 SPO 1997 04 30 12 35 357 9.1 -9 677.60 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 36 357 9.1 -9 677.60 -54.6 -54.2 -54.8 63 -99 SPO 1997 04 30 12 37 356 9.2 -9 677.60 -54.7 -54.2 -54.8 64 -99 SPO 1997 04 30 12 38 356 9.0 -9 677.60 -54.7 -54.2 -54.8 64 -99 SPO 1997 04 30 12 39 356 9.1 -9 677.60 -54.7 -54.2 -54.8 64 -99 SPO 1997 04 30 12 40 356 9.3 -9 677.60 -54.6 -54.2 -54.7 63 -99 SPO 1997 04 30 12 41 356 9.1 -9 677.60 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 42 355 9.2 -9 677.60 -54.7 -54.2 -54.7 65 -99 SPO 1997 04 30 12 43 355 9.2 -9 677.60 -54.6 -54.2 -54.7 64 -99 SPO 1997 04 30 12 44 356 8.8 -9 677.60 -54.6 -54.2 -54.8 64 -99 SPO 1997 04 30 12 45 355 9.0 -9 677.60 -54.7 -54.2 -54.8 65 -99 SPO 1997 04 30 12 46 356 9.1 -9 677.60 -54.7 -54.2 -54.7 64 -99 SPO 1997 04 30 12 47 356 9.0 -9 677.60 -54.7 -54.2 -54.7 64 -99 SPO 1997 04 30 12 48 356 8.8 -9 677.60 -54.6 -54.1 -54.7 63 -99 SPO 1997 04 30 12 49 356 9.0 -9 677.60 -54.6 -54.1 -54.7 63 -99 SPO 1997 04 30 12 50 355 9.0 -9 677.60 -54.6 -54.1 -54.7 63 -99 SPO 1997 04 30 12 51 355 8.9 -9 677.60 -54.6 -54.1 -54.7 64 -99 SPO 1997 04 30 12 52 355 8.9 -9 677.60 -54.6 -54.1 -54.6 65 -99 SPO 1997 04 30 12 53 355 9.1 -9 677.60 -54.6 -54.1 -54.6 65 -99 SPO 1997 04 30 12 54 355 9.2 -9 677.60 -54.6 -54.1 -54.6 65 -99 SPO 1997 04 30 12 55 355 9.2 -9 677.60 -54.6 -54.0 -54.6 65 -99 SPO 1997 04 30 12 56 355 9.0 -9 677.60 -54.5 -54.0 -54.6 63 -99 SPO 1997 04 30 12 57 355 9.2 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 12 58 355 9.1 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 12 59 355 9.1 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 13 00 355 9.1 -9 677.60 -54.5 -54.1 -54.6 63 0 SPO 1997 04 30 13 01 355 9.1 -9 677.60 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 02 355 8.9 -9 677.60 -54.6 -54.1 -54.6 65 -99 SPO 1997 04 30 13 03 356 8.9 -9 677.60 -54.6 -54.2 -54.6 66 -99 SPO 1997 04 30 13 04 355 8.9 -9 677.60 -54.6 -54.2 -54.6 66 -99 SPO 1997 04 30 13 05 355 8.9 -9 677.60 -54.6 -54.1 -54.7 66 -99 SPO 1997 04 30 13 06 356 8.8 -9 677.60 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 07 356 9.1 -9 677.60 -54.5 -54.1 -54.6 65 -99 SPO 1997 04 30 13 08 355 8.9 -9 677.60 -54.5 -54.1 -54.6 65 -99 SPO 1997 04 30 13 09 356 9.0 -9 677.50 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 10 355 9.0 -9 677.50 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 11 355 8.7 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 13 12 355 8.7 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 13 13 354 8.8 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 13 14 355 8.8 -9 677.60 -54.5 -54.2 -54.6 63 -99 SPO 1997 04 30 13 15 355 9.2 -9 677.50 -54.5 -54.2 -54.6 65 -99 SPO 1997 04 30 13 16 355 9.2 -9 677.50 -54.5 -54.2 -54.6 65 -99 SPO 1997 04 30 13 17 356 9.0 -9 677.50 -54.5 -54.2 -54.6 66 -99 SPO 1997 04 30 13 18 355 9.1 -9 677.50 -54.5 -54.2 -54.6 66 -99 SPO 1997 04 30 13 19 356 8.9 -9 677.60 -54.5 -54.2 -54.6 66 -99 SPO 1997 04 30 13 20 356 9.0 -9 677.60 -54.5 -54.2 -54.6 65 -99 SPO 1997 04 30 13 21 356 9.1 -9 677.60 -54.5 -54.1 -54.6 65 -99 SPO 1997 04 30 13 22 355 8.9 -9 677.60 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 23 356 8.9 -9 677.60 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 24 356 9.2 -9 677.60 -54.5 -54.1 -54.6 63 -99 SPO 1997 04 30 13 25 356 9.3 -9 677.50 -54.5 -54.1 -54.6 64 -99 SPO 1997 04 30 13 26 356 9.3 -9 677.50 -54.5 -54.1 -54.6 65 -99 SPO 1997 04 30 13 27 356 9.4 -9 677.50 -54.5 -54.1 -54.6 66 -99 SPO 1997 04 30 13 28 356 9.6 -9 677.50 -54.5 -54.1 -54.6 66 -99 SPO 1997 04 30 13 29 355 9.2 -9 677.50 -54.5 -54.1 -54.5 66 -99 SPO 1997 04 30 13 30 355 9.6 -9 677.50 -54.5 -54.1 -54.6 66 -99 SPO 1997 04 30 13 31 355 9.5 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 32 355 9.7 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 33 355 9.6 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 34 355 9.5 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 35 355 9.8 -9 677.50 -54.4 -54.2 -54.5 67 -99 SPO 1997 04 30 13 36 355 9.6 -9 677.50 -54.4 -54.2 -54.6 67 -99 SPO 1997 04 30 13 37 355 9.5 -9 677.50 -54.5 -54.2 -54.6 68 -99 SPO 1997 04 30 13 38 354 9.7 -9 677.50 -54.4 -54.2 -54.6 67 -99 SPO 1997 04 30 13 39 354 9.8 -9 677.50 -54.4 -54.2 -54.5 67 -99 SPO 1997 04 30 13 40 354 9.5 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 41 354 9.4 -9 677.50 -54.4 -54.1 -54.6 67 -99 SPO 1997 04 30 13 42 355 9.7 -9 677.50 -54.4 -54.1 -54.6 67 -99 SPO 1997 04 30 13 43 356 9.7 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 13 44 355 9.7 -9 677.50 -54.4 -54.1 -54.5 66 -99 SPO 1997 04 30 13 45 356 9.9 -9 677.50 -54.4 -54.1 -54.5 64 -99 SPO 1997 04 30 13 46 356 9.9 -9 677.50 -54.4 -54.1 -54.5 64 -99 SPO 1997 04 30 13 47 355 9.8 -9 677.50 -54.4 -54.1 -54.5 64 -99 SPO 1997 04 30 13 48 355 9.8 -9 677.50 -54.4 -54.2 -54.5 66 -99 SPO 1997 04 30 13 49 354 10.0 -9 677.50 -54.4 -54.2 -54.5 66 -99 SPO 1997 04 30 13 50 354 9.8 -9 677.50 -54.4 -54.2 -54.4 66 -99 SPO 1997 04 30 13 51 355 10.0 -9 677.50 -54.4 -54.2 -54.5 67 -99 SPO 1997 04 30 13 52 355 9.9 -9 677.50 -54.4 -54.2 -54.5 67 -99 SPO 1997 04 30 13 53 355 10.0 -9 677.50 -54.4 -54.2 -54.4 67 -99 SPO 1997 04 30 13 54 355 9.9 -9 677.50 -54.4 -54.2 -54.4 67 -99 SPO 1997 04 30 13 55 356 9.7 -9 677.50 -54.3 -54.2 -54.4 67 -99 SPO 1997 04 30 13 56 356 10.2 -9 677.50 -54.3 -54.2 -54.4 66 -99 SPO 1997 04 30 13 57 356 9.8 -9 677.50 -54.3 -54.1 -54.4 66 -99 SPO 1997 04 30 13 58 355 9.9 -9 677.50 -54.3 -54.1 -54.4 66 -99 SPO 1997 04 30 13 59 355 9.7 -9 677.60 -54.3 -54.2 -54.4 66 -99 SPO 1997 04 30 14 00 355 9.8 -9 677.50 -54.3 -54.1 -54.4 67 0 SPO 1997 04 30 14 01 355 9.4 -9 677.50 -54.3 -54.1 -54.4 67 -99 SPO 1997 04 30 14 02 355 9.4 -9 677.60 -54.3 -54.1 -54.4 67 -99 SPO 1997 04 30 14 03 355 9.2 -9 677.60 -54.3 -54.1 -54.4 67 -99 SPO 1997 04 30 14 04 355 9.2 -9 677.60 -54.3 -54.2 -54.4 67 -99 SPO 1997 04 30 14 05 355 9.6 -9 677.60 -54.3 -54.2 -54.4 67 -99 SPO 1997 04 30 14 06 356 9.5 -9 677.60 -54.3 -54.1 -54.4 67 -99 SPO 1997 04 30 14 07 358 9.6 -9 677.60 -54.3 -54.1 -54.4 67 -99 SPO 1997 04 30 14 08 356 9.3 -9 677.60 -54.3 -54.2 -54.4 67 -99 SPO 1997 04 30 14 09 359 9.6 -9 677.60 -54.3 -54.2 -54.5 67 -99 SPO 1997 04 30 14 10 358 9.4 -9 677.60 -54.3 -54.2 -54.4 66 -99 SPO 1997 04 30 14 11 358 9.6 -9 677.60 -54.3 -54.2 -54.5 67 -99 SPO 1997 04 30 14 12 358 9.3 -9 677.60 -54.4 -54.2 -54.5 67 -99 SPO 1997 04 30 14 13 358 9.8 -9 677.50 -54.4 -54.2 -54.5 68 -99 SPO 1997 04 30 14 14 357 9.8 -9 677.50 -54.3 -54.2 -54.4 67 -99 SPO 1997 04 30 14 15 357 9.8 -9 677.50 -54.4 -54.2 -54.5 68 -99 SPO 1997 04 30 14 16 357 9.4 -9 677.50 -54.4 -54.1 -54.5 68 -99 SPO 1997 04 30 14 17 357 9.6 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 14 18 357 9.6 -9 677.50 -54.4 -54.1 -54.5 67 -99 SPO 1997 04 30 14 19 357 9.8 -9 677.50 -54.4 -54.1 -54.5 66 -99 SPO 1997 04 30 14 20 356 9.7 -9 677.50 -54.4 -54.1 -54.5 64 -99 SPO 1997 04 30 14 21 355 9.7 -9 677.50 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 30 14 22 355 9.7 -9 677.50 -54.4 -54.2 -54.5 64 -99 SPO 1997 04 30 14 23 354 9.5 -9 677.50 -54.4 -54.2 -54.5 66 -99 SPO 1997 04 30 14 24 355 9.3 -9 677.50 -54.4 -54.2 -54.6 66 -99 SPO 1997 04 30 14 25 356 9.4 -9 677.50 -54.4 -54.3 -54.6 67 -99 SPO 1997 04 30 14 26 356 9.3 -9 677.50 -54.4 -54.3 -54.6 67 -99 SPO 1997 04 30 14 27 356 9.3 -9 677.50 -54.5 -54.3 -54.6 68 -99 SPO 1997 04 30 14 28 356 9.5 -9 677.50 -54.5 -54.3 -54.6 67 -99 SPO 1997 04 30 14 29 356 9.4 -9 677.50 -54.5 -54.3 -54.6 67 -99 SPO 1997 04 30 14 30 356 9.4 -9 677.50 -54.5 -54.3 -54.6 66 -99 SPO 1997 04 30 14 31 356 9.3 -9 677.50 -54.5 -54.3 -54.6 65 -99 SPO 1997 04 30 14 32 356 9.1 -9 677.50 -54.5 -54.3 -54.6 65 -99 SPO 1997 04 30 14 33 358 9.3 -9 677.50 -54.5 -54.3 -54.6 65 -99 SPO 1997 04 30 14 34 358 9.2 -9 677.50 -54.5 -54.3 -54.6 66 -99 SPO 1997 04 30 14 35 357 9.1 -9 677.50 -54.5 -54.3 -54.6 66 -99 SPO 1997 04 30 14 36 357 8.8 -9 677.50 -54.5 -54.4 -54.6 66 -99 SPO 1997 04 30 14 37 356 9.2 -9 677.50 -54.5 -54.4 -54.6 66 -99 SPO 1997 04 30 14 38 356 9.3 -9 677.50 -54.5 -54.5 -54.6 67 -99 SPO 1997 04 30 14 39 356 9.2 -9 677.50 -54.5 -54.5 -54.6 67 -99 SPO 1997 04 30 14 40 355 9.1 -9 677.50 -54.6 -54.5 -54.7 68 -99 SPO 1997 04 30 14 41 355 9.3 -9 677.50 -54.6 -54.5 -54.7 67 -99 SPO 1997 04 30 14 42 357 9.2 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 43 356 9.0 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 44 356 9.2 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 45 357 9.3 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 46 357 9.7 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 47 357 9.3 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 48 357 9.3 -9 677.50 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 49 356 9.6 -9 677.50 -54.6 -54.5 -54.6 66 -99 SPO 1997 04 30 14 50 357 9.5 -9 677.50 -54.6 -54.4 -54.7 67 -99 SPO 1997 04 30 14 51 355 9.3 -9 677.50 -54.6 -54.5 -54.7 67 -99 SPO 1997 04 30 14 52 356 9.3 -9 677.60 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 14 53 356 9.2 -9 677.50 -54.6 -54.4 -54.6 65 -99 SPO 1997 04 30 14 54 356 9.1 -9 677.60 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 30 14 55 356 9.2 -9 677.60 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 30 14 56 355 9.0 -9 677.60 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 30 14 57 355 9.1 -9 677.60 -54.6 -54.5 -54.7 64 -99 SPO 1997 04 30 14 58 355 8.9 -9 677.60 -54.6 -54.6 -54.7 65 -99 SPO 1997 04 30 14 59 355 8.9 -9 677.60 -54.6 -54.6 -54.7 65 -99 SPO 1997 04 30 15 00 355 9.3 -9 677.60 -54.6 -54.5 -54.7 65 0 SPO 1997 04 30 15 01 356 9.0 -9 677.60 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 15 02 355 8.9 -9 677.60 -54.6 -54.5 -54.7 66 -99 SPO 1997 04 30 15 03 356 8.7 -9 677.60 -54.6 -54.5 -54.7 65 -99 SPO 1997 04 30 15 04 357 8.9 -9 677.60 -54.6 -54.6 -54.7 64 -99 SPO 1997 04 30 15 05 357 8.6 -9 677.60 -54.6 -54.5 -54.7 63 -99 SPO 1997 04 30 15 06 357 8.7 -9 677.60 -54.6 -54.6 -54.7 63 -99 SPO 1997 04 30 15 07 357 8.7 -9 677.60 -54.6 -54.6 -54.7 63 -99 SPO 1997 04 30 15 08 358 8.6 -9 677.60 -54.7 -54.5 -54.8 64 -99 SPO 1997 04 30 15 09 358 8.7 -9 677.60 -54.7 -54.6 -54.7 64 -99 SPO 1997 04 30 15 10 356 8.7 -9 677.60 -54.6 -54.6 -54.8 63 -99 SPO 1997 04 30 15 11 357 8.9 -9 677.60 -54.6 -54.6 -54.8 63 -99 SPO 1997 04 30 15 12 356 9.1 -9 677.60 -54.6 -54.6 -54.7 64 -99 SPO 1997 04 30 15 13 356 9.2 -9 677.60 -54.6 -54.7 -54.7 64 -99 SPO 1997 04 30 15 14 355 9.2 -9 677.60 -54.6 -54.7 -54.7 65 -99 SPO 1997 04 30 15 15 356 8.9 -9 677.60 -54.6 -54.7 -54.8 64 -99 SPO 1997 04 30 15 16 356 9.0 -9 677.60 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 17 355 8.8 -9 677.60 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 18 356 8.8 -9 677.60 -54.7 -54.7 -54.8 64 -99 SPO 1997 04 30 15 19 355 8.9 -9 677.60 -54.7 -54.7 -54.8 64 -99 SPO 1997 04 30 15 20 356 8.9 -9 677.60 -54.7 -54.7 -54.8 64 -99 SPO 1997 04 30 15 21 355 9.0 -9 677.60 -54.7 -54.7 -54.8 64 -99 SPO 1997 04 30 15 22 353 8.6 -9 677.70 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 23 353 8.6 -9 677.70 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 24 355 9.3 -9 677.70 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 25 356 9.5 -9 677.60 -54.7 -54.6 -54.8 65 -99 SPO 1997 04 30 15 26 356 9.0 -9 677.60 -54.7 -54.7 -54.8 65 -99 SPO 1997 04 30 15 27 356 8.9 -9 677.70 -54.7 -54.7 -54.9 64 -99 SPO 1997 04 30 15 28 355 9.1 -9 677.70 -54.7 -54.8 -54.8 64 -99 SPO 1997 04 30 15 29 354 9.0 -9 677.70 -54.8 -54.8 -54.9 65 -99 SPO 1997 04 30 15 30 354 8.5 -9 677.70 -54.7 -54.8 -54.9 64 -99 SPO 1997 04 30 15 31 353 8.8 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 32 353 8.8 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 33 355 8.9 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 34 352 8.8 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 35 352 8.9 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 36 349 8.8 -9 677.70 -54.8 -54.8 -54.9 66 -99 SPO 1997 04 30 15 37 351 8.8 -9 677.70 -54.8 -54.8 -54.9 65 -99 SPO 1997 04 30 15 38 349 8.7 -9 677.70 -54.8 -54.8 -55.0 65 -99 SPO 1997 04 30 15 39 350 8.6 -9 677.70 -54.9 -54.8 -55.0 65 -99 SPO 1997 04 30 15 40 350 8.7 -9 677.70 -54.9 -54.8 -55.0 65 -99 SPO 1997 04 30 15 41 351 8.7 -9 677.70 -54.9 -54.8 -55.0 64 -99 SPO 1997 04 30 15 42 352 8.4 -9 677.70 -54.8 -54.8 -55.0 62 -99 SPO 1997 04 30 15 43 352 9.0 -9 677.70 -54.9 -54.8 -55.0 63 -99 SPO 1997 04 30 15 44 352 8.7 -9 677.70 -54.9 -54.9 -55.0 63 -99 SPO 1997 04 30 15 45 352 8.6 -9 677.70 -54.9 -54.9 -55.0 64 -99 SPO 1997 04 30 15 46 352 8.7 -9 677.70 -54.9 -54.9 -55.1 64 -99 SPO 1997 04 30 15 47 353 8.4 -9 677.70 -54.9 -55.0 -55.1 65 -99 SPO 1997 04 30 15 48 353 8.8 -9 677.70 -55.0 -55.0 -55.1 66 -99 SPO 1997 04 30 15 49 353 8.7 -9 677.70 -55.0 -54.9 -55.1 66 -99 SPO 1997 04 30 15 50 353 8.8 -9 677.70 -55.0 -55.0 -55.1 66 -99 SPO 1997 04 30 15 51 354 8.5 -9 677.70 -55.0 -55.0 -55.1 65 -99 SPO 1997 04 30 15 52 354 8.8 -9 677.70 -55.0 -55.0 -55.2 64 -99 SPO 1997 04 30 15 53 354 9.1 -9 677.70 -55.0 -55.0 -55.2 64 -99 SPO 1997 04 30 15 54 353 9.0 -9 677.80 -55.1 -55.0 -55.2 65 -99 SPO 1997 04 30 15 55 354 9.0 -9 677.80 -55.1 -55.0 -55.2 66 -99 SPO 1997 04 30 15 56 353 9.0 -9 677.70 -55.1 -55.0 -55.2 66 -99 SPO 1997 04 30 15 57 353 9.0 -9 677.70 -55.0 -55.0 -55.2 65 -99 SPO 1997 04 30 15 58 353 9.1 -9 677.80 -55.1 -55.0 -55.2 66 -99 SPO 1997 04 30 15 59 353 8.7 -9 677.80 -55.1 -55.0 -55.2 65 -99 SPO 1997 04 30 16 00 353 8.8 -9 677.80 -55.1 -55.0 -55.2 65 0 SPO 1997 04 30 16 01 353 8.7 -9 677.80 -55.2 -55.1 -55.2 66 -99 SPO 1997 04 30 16 02 353 8.9 -9 677.80 -55.2 -55.1 -55.3 65 -99 SPO 1997 04 30 16 03 354 8.6 -9 677.80 -55.2 -55.1 -55.3 65 -99 SPO 1997 04 30 16 04 353 8.3 -9 677.80 -55.2 -55.1 -55.3 65 -99 SPO 1997 04 30 16 05 353 8.6 -9 677.80 -55.2 -55.1 -55.4 64 -99 SPO 1997 04 30 16 06 353 8.4 -9 677.80 -55.2 -55.2 -55.4 64 -99 SPO 1997 04 30 16 07 354 8.4 -9 677.80 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 16 08 353 8.4 -9 677.80 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 16 09 353 8.4 -9 677.80 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 16 10 354 8.3 -9 677.80 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 16 11 353 8.3 -9 677.80 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 16 12 354 8.3 -9 677.80 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 16 13 353 8.4 -9 677.80 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 16 14 354 8.5 -9 677.80 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 16 15 355 8.7 -9 677.70 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 16 16 355 8.6 -9 677.70 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 16 17 356 8.5 -9 677.70 -55.4 -55.2 -55.4 64 -99 SPO 1997 04 30 16 18 357 8.6 -9 677.70 -55.4 -55.2 -55.5 64 -99 SPO 1997 04 30 16 19 357 8.3 -9 677.70 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 16 20 357 8.4 -9 677.70 -55.3 -55.2 -55.5 65 -99 SPO 1997 04 30 16 21 357 8.4 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 22 357 8.6 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 23 357 8.4 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 24 357 7.9 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 25 356 8.1 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 26 356 8.2 -9 677.70 -55.4 -55.2 -55.5 64 -99 SPO 1997 04 30 16 27 356 8.1 -9 677.70 -55.4 -55.2 -55.5 64 -99 SPO 1997 04 30 16 28 357 8.3 -9 677.70 -55.4 -55.2 -55.5 64 -99 SPO 1997 04 30 16 29 357 8.3 -9 677.60 -55.3 -55.2 -55.5 63 -99 SPO 1997 04 30 16 30 357 8.3 -9 677.60 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 31 357 8.3 -9 677.70 -55.4 -55.2 -55.4 65 -99 SPO 1997 04 30 16 32 357 8.4 -9 677.70 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 16 33 357 8.4 -9 677.70 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 16 34 357 8.3 -9 677.60 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 35 358 8.3 -9 677.60 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 36 359 8.5 -9 677.60 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 37 358 8.7 -9 677.60 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 16 38 359 8.3 -9 677.60 -55.4 -55.3 -55.4 64 -99 SPO 1997 04 30 16 39 359 8.5 -9 677.60 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 16 40 359 8.4 -9 677.60 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 16 41 1 8.5 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 42 0 8.2 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 43 359 8.4 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 44 357 8.4 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 45 359 8.2 -9 677.50 -55.3 -55.3 -55.5 65 -99 SPO 1997 04 30 16 46 358 8.4 -9 677.50 -55.3 -55.3 -55.5 65 -99 SPO 1997 04 30 16 47 358 8.4 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 48 357 8.7 -9 677.50 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 16 49 357 8.3 -9 677.50 -55.3 -55.3 -55.4 63 -99 SPO 1997 04 30 16 50 358 8.3 -9 677.50 -55.4 -55.4 -55.5 64 -99 SPO 1997 04 30 16 51 358 8.2 -9 677.50 -55.4 -55.4 -55.5 64 -99 SPO 1997 04 30 16 52 359 8.3 -9 677.50 -55.4 -55.4 -55.5 64 -99 SPO 1997 04 30 16 53 359 8.0 -9 677.50 -55.3 -55.4 -55.5 64 -99 SPO 1997 04 30 16 54 359 8.1 -9 677.50 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 16 55 359 8.0 -9 677.50 -55.4 -55.4 -55.5 66 -99 SPO 1997 04 30 16 56 359 8.1 -9 677.50 -55.4 -55.4 -55.4 66 -99 SPO 1997 04 30 16 57 359 8.3 -9 677.50 -55.4 -55.4 -55.4 66 -99 SPO 1997 04 30 16 58 359 8.5 -9 677.50 -55.3 -55.4 -55.4 65 -99 SPO 1997 04 30 16 59 357 8.2 -9 677.50 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 17 00 358 8.3 -9 677.50 -55.3 -55.3 -55.4 65 0 SPO 1997 04 30 17 01 359 8.8 -9 677.50 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 17 02 359 8.3 -9 677.40 -55.2 -55.3 -55.4 65 -99 SPO 1997 04 30 17 03 358 8.1 -9 677.40 -55.2 -55.3 -55.4 64 -99 SPO 1997 04 30 17 04 358 8.5 -9 677.40 -55.2 -55.3 -55.4 65 -99 SPO 1997 04 30 17 05 358 8.7 -9 677.40 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 06 359 8.3 -9 677.40 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 07 357 8.5 -9 677.50 -55.2 -55.4 -55.3 65 -99 SPO 1997 04 30 17 08 358 8.8 -9 677.50 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 09 359 8.5 -9 677.50 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 10 359 8.7 -9 677.50 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 11 1 8.6 -9 677.50 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 12 359 8.4 -9 677.50 -55.2 -55.3 -55.3 64 -99 SPO 1997 04 30 17 13 359 8.3 -9 677.50 -55.2 -55.3 -55.3 64 -99 SPO 1997 04 30 17 14 359 8.0 -9 677.60 -55.2 -55.3 -55.3 64 -99 SPO 1997 04 30 17 15 358 8.0 -9 677.60 -55.2 -55.3 -55.3 64 -99 SPO 1997 04 30 17 16 358 8.2 -9 677.60 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 17 17 359 8.2 -9 677.50 -55.2 -55.2 -55.3 65 -99 SPO 1997 04 30 17 18 359 8.5 -9 677.50 -55.2 -55.3 -55.3 66 -99 SPO 1997 04 30 17 19 359 8.8 -9 677.50 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 17 20 358 8.7 -9 677.50 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 17 21 357 8.4 -9 677.50 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 17 22 357 8.5 -9 677.50 -55.1 -55.2 -55.2 64 -99 SPO 1997 04 30 17 23 357 8.4 -9 677.50 -55.1 -55.2 -55.2 64 -99 SPO 1997 04 30 17 24 358 8.5 -9 677.50 -55.1 -55.3 -55.2 63 -99 SPO 1997 04 30 17 25 357 8.3 -9 677.50 -55.1 -55.3 -55.2 63 -99 SPO 1997 04 30 17 26 356 8.7 -9 677.50 -55.1 -55.3 -55.2 63 -99 SPO 1997 04 30 17 27 357 8.9 -9 677.50 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 17 28 356 8.8 -9 677.50 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 17 29 358 8.7 -9 677.40 -55.0 -55.2 -55.1 65 -99 SPO 1997 04 30 17 30 357 8.6 -9 677.50 -55.0 -55.2 -55.1 65 -99 SPO 1997 04 30 17 31 356 8.4 -9 677.50 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 17 32 355 8.3 -9 677.50 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 17 33 356 8.3 -9 677.50 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 17 34 357 8.4 -9 677.40 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 17 35 358 8.4 -9 677.40 -55.0 -55.1 -55.0 65 -99 SPO 1997 04 30 17 36 358 8.4 -9 677.40 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 30 17 37 357 8.8 -9 677.40 -54.8 -55.0 -55.0 62 -99 SPO 1997 04 30 17 38 357 8.5 -9 677.50 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 30 17 39 356 8.1 -9 677.50 -54.9 -55.1 -55.0 64 -99 SPO 1997 04 30 17 40 356 8.1 -9 677.50 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 17 41 354 7.8 -9 677.60 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 17 42 354 8.2 -9 677.60 -54.9 -55.1 -55.0 66 -99 SPO 1997 04 30 17 43 354 7.9 -9 677.60 -54.9 -55.1 -55.0 66 -99 SPO 1997 04 30 17 44 354 7.8 -9 677.60 -54.8 -55.1 -55.0 65 -99 SPO 1997 04 30 17 45 354 8.0 -9 677.60 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 17 46 355 8.0 -9 677.60 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 17 47 355 7.7 -9 677.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 17 48 354 7.6 -9 677.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 17 49 354 7.6 -9 677.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 17 50 354 7.7 -9 677.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 17 51 352 7.7 -9 677.60 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 17 52 353 7.8 -9 677.60 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 53 354 7.8 -9 677.60 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 54 352 8.0 -9 677.60 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 17 55 352 7.8 -9 677.70 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 56 353 7.3 -9 677.70 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 57 350 6.7 -9 677.70 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 58 351 6.8 -9 677.80 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 17 59 352 7.4 -9 677.80 -54.7 -55.0 -54.9 63 -99 SPO 1997 04 30 18 00 353 7.5 -9 677.80 -54.7 -55.0 -54.9 63 0 SPO 1997 04 30 18 01 354 7.6 -9 677.80 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 02 356 7.0 -9 677.80 -54.7 -55.0 -54.9 65 -99 SPO 1997 04 30 18 03 355 6.9 -9 677.80 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 18 04 355 6.7 -9 677.80 -54.7 -55.0 -54.8 66 -99 SPO 1997 04 30 18 05 352 6.9 -9 677.80 -54.7 -54.9 -54.8 66 -99 SPO 1997 04 30 18 06 353 7.5 -9 677.80 -54.7 -55.0 -54.9 66 -99 SPO 1997 04 30 18 07 353 7.3 -9 677.80 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 18 08 354 7.1 -9 677.80 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 09 355 7.3 -9 677.80 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 10 356 7.4 -9 677.80 -54.8 -54.9 -54.8 64 -99 SPO 1997 04 30 18 11 354 7.2 -9 677.80 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 18 12 355 7.3 -9 677.80 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 18 13 354 7.3 -9 677.80 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 14 354 7.6 -9 677.90 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 15 353 7.3 -9 678.00 -54.8 -55.0 -54.9 66 -99 SPO 1997 04 30 18 16 354 7.3 -9 678.00 -54.8 -55.0 -54.9 66 -99 SPO 1997 04 30 18 17 354 7.1 -9 678.00 -54.8 -55.0 -54.9 66 -99 SPO 1997 04 30 18 18 353 7.3 -9 678.00 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 19 354 7.3 -9 678.00 -54.8 -55.0 -54.9 65 -99 SPO 1997 04 30 18 20 354 7.5 -9 678.00 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 18 21 354 7.5 -9 678.00 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 18 22 353 7.4 -9 678.00 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 18 23 353 7.5 -9 678.00 -54.8 -55.0 -55.0 63 -99 SPO 1997 04 30 18 24 354 7.5 -9 678.00 -54.9 -55.0 -55.0 64 -99 SPO 1997 04 30 18 25 354 7.5 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 26 354 7.5 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 27 356 7.8 -9 678.00 -54.8 -55.0 -55.0 63 -99 SPO 1997 04 30 18 28 355 7.8 -9 678.00 -54.8 -55.0 -55.0 63 -99 SPO 1997 04 30 18 29 356 7.5 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 30 356 8.0 -9 678.00 -54.9 -55.0 -55.0 66 -99 SPO 1997 04 30 18 31 355 8.1 -9 677.90 -54.8 -55.0 -55.0 65 -99 SPO 1997 04 30 18 32 355 8.2 -9 677.90 -54.8 -55.0 -55.0 64 -99 SPO 1997 04 30 18 33 355 7.6 -9 677.90 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 34 354 8.0 -9 677.90 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 35 354 7.6 -9 677.90 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 36 354 8.0 -9 678.00 -54.9 -55.0 -55.0 64 -99 SPO 1997 04 30 18 37 355 7.8 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 38 356 8.0 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 39 356 7.8 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 40 355 7.6 -9 678.00 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 18 41 355 7.5 -9 678.10 -54.9 -55.0 -55.0 66 -99 SPO 1997 04 30 18 42 354 7.2 -9 678.00 -55.0 -55.0 -55.0 66 -99 SPO 1997 04 30 18 43 355 7.7 -9 678.00 -54.9 -55.0 -55.1 65 -99 SPO 1997 04 30 18 44 355 7.5 -9 678.00 -54.9 -55.0 -55.0 64 -99 SPO 1997 04 30 18 45 355 8.0 -9 677.90 -54.9 -55.0 -55.1 63 -99 SPO 1997 04 30 18 46 354 7.9 -9 677.90 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 18 47 354 8.3 -9 678.00 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 18 48 355 7.5 -9 678.00 -54.9 -55.1 -55.1 64 -99 SPO 1997 04 30 18 49 355 7.9 -9 678.00 -54.9 -55.1 -55.1 65 -99 SPO 1997 04 30 18 50 356 7.8 -9 678.00 -54.9 -55.1 -55.1 65 -99 SPO 1997 04 30 18 51 355 7.9 -9 678.00 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 18 52 356 7.6 -9 678.00 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 18 53 356 8.0 -9 678.00 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 18 54 357 7.8 -9 677.90 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 18 55 357 8.1 -9 677.90 -55.0 -55.1 -55.1 66 -99 SPO 1997 04 30 18 56 356 8.0 -9 677.90 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 18 57 357 8.0 -9 677.90 -55.0 -55.1 -55.2 64 -99 SPO 1997 04 30 18 58 357 8.2 -9 678.00 -55.1 -55.1 -55.1 65 -99 SPO 1997 04 30 18 59 356 7.9 -9 678.00 -55.0 -55.1 -55.2 64 -99 SPO 1997 04 30 19 00 356 7.9 -9 678.00 -55.0 -55.1 -55.2 64 0 SPO 1997 04 30 19 01 357 8.0 -9 678.00 -55.0 -55.1 -55.2 64 -99 SPO 1997 04 30 19 02 357 8.2 -9 678.00 -55.1 -55.1 -55.2 65 -99 SPO 1997 04 30 19 03 358 8.1 -9 678.00 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 19 04 358 8.0 -9 678.00 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 19 05 358 7.9 -9 678.00 -55.1 -55.2 -55.3 66 -99 SPO 1997 04 30 19 06 358 8.0 -9 678.00 -55.1 -55.2 -55.3 66 -99 SPO 1997 04 30 19 07 358 8.1 -9 678.00 -55.2 -55.2 -55.3 66 -99 SPO 1997 04 30 19 08 358 7.8 -9 678.00 -55.2 -55.2 -55.3 66 -99 SPO 1997 04 30 19 09 358 8.1 -9 678.10 -55.2 -55.2 -55.3 65 -99 SPO 1997 04 30 19 10 358 8.1 -9 678.10 -55.2 -55.2 -55.3 65 -99 SPO 1997 04 30 19 11 358 7.8 -9 678.10 -55.2 -55.1 -55.4 65 -99 SPO 1997 04 30 19 12 357 8.0 -9 678.10 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 13 357 7.8 -9 678.10 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 14 358 8.1 -9 678.00 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 15 358 8.3 -9 678.00 -55.2 -55.1 -55.4 65 -99 SPO 1997 04 30 19 16 358 8.1 -9 678.00 -55.2 -55.1 -55.4 66 -99 SPO 1997 04 30 19 17 358 8.2 -9 678.00 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 18 358 8.2 -9 678.00 -55.2 -55.1 -55.4 63 -99 SPO 1997 04 30 19 19 358 8.3 -9 678.00 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 20 357 8.1 -9 678.10 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 21 358 8.3 -9 678.10 -55.3 -55.2 -55.4 63 -99 SPO 1997 04 30 19 22 358 8.2 -9 678.00 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 23 359 8.4 -9 678.00 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 24 359 8.1 -9 678.00 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 19 25 359 8.0 -9 678.00 -55.4 -55.2 -55.5 65 -99 SPO 1997 04 30 19 26 359 8.0 -9 678.00 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 27 360 8.1 -9 678.00 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 28 0 8.2 -9 678.00 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 29 1 8.3 -9 678.00 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 30 1 8.2 -9 678.00 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 31 1 8.2 -9 678.00 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 32 1 8.1 -9 678.10 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 33 1 8.0 -9 678.10 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 19 34 1 8.0 -9 678.10 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 19 35 2 8.0 -9 678.00 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 36 2 7.9 -9 678.00 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 37 1 7.7 -9 678.10 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 19 38 1 7.7 -9 678.10 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 19 39 1 8.0 -9 678.00 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 19 40 1 7.8 -9 678.00 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 19 41 2 7.9 -9 678.00 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 42 2 7.7 -9 678.10 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 43 2 7.5 -9 678.10 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 44 3 7.5 -9 678.10 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 19 45 3 7.5 -9 678.10 -55.3 -55.1 -55.4 63 -99 SPO 1997 04 30 19 46 5 7.5 -9 678.10 -55.4 -55.1 -55.4 65 -99 SPO 1997 04 30 19 47 6 7.4 -9 678.10 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 48 7 7.5 -9 678.10 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 49 7 7.5 -9 678.10 -55.3 -55.1 -55.4 65 -99 SPO 1997 04 30 19 50 7 7.6 -9 678.10 -55.3 -55.1 -55.4 64 -99 SPO 1997 04 30 19 51 8 7.5 -9 678.10 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 19 52 9 7.4 -9 678.10 -55.4 -55.2 -55.4 65 -99 SPO 1997 04 30 19 53 9 7.4 -9 678.00 -55.4 -55.3 -55.4 64 -99 SPO 1997 04 30 19 54 10 7.8 -9 678.00 -55.3 -55.3 -55.4 63 -99 SPO 1997 04 30 19 55 10 7.6 -9 678.00 -55.3 -55.3 -55.5 63 -99 SPO 1997 04 30 19 56 9 7.8 -9 678.00 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 19 57 9 7.9 -9 678.00 -55.4 -55.3 -55.4 64 -99 SPO 1997 04 30 19 58 9 7.6 -9 678.00 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 19 59 8 7.7 -9 677.90 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 20 00 10 7.8 -9 677.90 -55.4 -55.2 -55.4 65 0 SPO 1997 04 30 20 01 9 7.9 -9 677.90 -55.4 -55.2 -55.4 65 -99 SPO 1997 04 30 20 02 8 7.3 -9 678.00 -55.4 -55.2 -55.4 65 -99 SPO 1997 04 30 20 03 8 7.4 -9 678.00 -55.4 -55.2 -55.4 65 -99 SPO 1997 04 30 20 04 9 7.4 -9 678.00 -55.3 -55.2 -55.4 65 -99 SPO 1997 04 30 20 05 9 7.5 -9 678.00 -55.3 -55.2 -55.5 64 -99 SPO 1997 04 30 20 06 9 7.5 -9 677.90 -55.3 -55.2 -55.4 64 -99 SPO 1997 04 30 20 07 9 7.5 -9 677.90 -55.3 -55.2 -55.4 63 -99 SPO 1997 04 30 20 08 7 7.8 -9 677.90 -55.3 -55.2 -55.4 63 -99 SPO 1997 04 30 20 09 8 7.7 -9 677.90 -55.3 -55.3 -55.4 64 -99 SPO 1997 04 30 20 10 10 7.4 -9 677.90 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 11 9 7.5 -9 677.90 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 12 11 7.5 -9 677.90 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 13 13 7.5 -9 677.90 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 14 10 7.3 -9 677.90 -55.4 -55.3 -55.4 65 -99 SPO 1997 04 30 20 15 6 6.8 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 16 6 7.2 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 17 5 7.2 -9 677.90 -55.4 -55.4 -55.5 64 -99 SPO 1997 04 30 20 18 5 7.6 -9 677.90 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 20 19 3 7.9 -9 677.80 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 20 20 1 8.3 -9 677.80 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 20 21 3 8.2 -9 677.80 -55.3 -55.3 -55.5 65 -99 SPO 1997 04 30 20 22 2 8.0 -9 677.80 -55.3 -55.2 -55.5 65 -99 SPO 1997 04 30 20 23 0 8.0 -9 677.80 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 20 24 1 8.3 -9 677.80 -55.4 -55.3 -55.5 65 -99 SPO 1997 04 30 20 25 3 8.2 -9 677.80 -55.4 -55.3 -55.4 65 -99 SPO 1997 04 30 20 26 2 8.3 -9 677.80 -55.4 -55.3 -55.4 65 -99 SPO 1997 04 30 20 27 2 8.3 -9 677.80 -55.3 -55.3 -55.4 64 -99 SPO 1997 04 30 20 28 3 8.5 -9 677.80 -55.4 -55.3 -55.5 64 -99 SPO 1997 04 30 20 29 5 8.2 -9 677.80 -55.3 -55.3 -55.5 63 -99 SPO 1997 04 30 20 30 2 8.0 -9 677.90 -55.4 -55.4 -55.5 64 -99 SPO 1997 04 30 20 31 2 7.7 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 32 1 7.8 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 33 2 7.9 -9 677.90 -55.4 -55.4 -55.5 66 -99 SPO 1997 04 30 20 34 1 7.8 -9 677.90 -55.4 -55.4 -55.5 66 -99 SPO 1997 04 30 20 35 1 8.1 -9 677.90 -55.4 -55.4 -55.5 66 -99 SPO 1997 04 30 20 36 2 7.8 -9 677.90 -55.4 -55.4 -55.5 66 -99 SPO 1997 04 30 20 37 2 8.1 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 38 2 7.8 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 39 2 8.2 -9 677.90 -55.4 -55.4 -55.5 65 -99 SPO 1997 04 30 20 40 2 8.2 -9 677.80 -55.3 -55.3 -55.4 63 -99 SPO 1997 04 30 20 41 359 8.0 -9 677.80 -55.3 -55.3 -55.4 63 -99 SPO 1997 04 30 20 42 355 7.3 -9 678.00 -55.3 -55.4 -55.4 63 -99 SPO 1997 04 30 20 43 355 7.3 -9 678.00 -55.3 -55.4 -55.4 65 -99 SPO 1997 04 30 20 44 357 7.9 -9 678.00 -55.3 -55.4 -55.4 65 -99 SPO 1997 04 30 20 45 359 8.0 -9 677.90 -55.3 -55.4 -55.4 65 -99 SPO 1997 04 30 20 46 0 8.2 -9 677.90 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 47 1 8.0 -9 677.90 -55.3 -55.3 -55.4 66 -99 SPO 1997 04 30 20 48 2 8.2 -9 677.90 -55.3 -55.3 -55.3 66 -99 SPO 1997 04 30 20 49 4 8.2 -9 677.80 -55.2 -55.2 -55.3 66 -99 SPO 1997 04 30 20 50 3 7.5 -9 677.90 -55.2 -55.2 -55.4 66 -99 SPO 1997 04 30 20 51 3 7.5 -9 677.80 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 52 5 7.7 -9 677.80 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 53 4 7.8 -9 677.80 -55.3 -55.3 -55.4 65 -99 SPO 1997 04 30 20 54 4 7.4 -9 677.80 -55.2 -55.3 -55.4 64 -99 SPO 1997 04 30 20 55 5 7.9 -9 677.80 -55.2 -55.3 -55.4 65 -99 SPO 1997 04 30 20 56 5 8.2 -9 677.80 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 20 57 3 8.0 -9 677.80 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 20 58 4 8.0 -9 677.80 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 20 59 3 8.0 -9 677.80 -55.2 -55.3 -55.3 66 -99 SPO 1997 04 30 21 00 2 8.2 -9 677.80 -55.2 -55.3 -55.3 66 0 SPO 1997 04 30 21 01 3 8.2 -9 677.80 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 21 02 4 8.2 -9 677.80 -55.2 -55.3 -55.3 65 -99 SPO 1997 04 30 21 03 4 8.6 -9 677.80 -55.2 -55.3 -55.3 64 -99 SPO 1997 04 30 21 04 4 8.3 -9 677.70 -55.2 -55.2 -55.3 64 -99 SPO 1997 04 30 21 05 3 8.3 -9 677.80 -55.2 -55.2 -55.3 65 -99 SPO 1997 04 30 21 06 3 8.3 -9 677.80 -55.2 -55.2 -55.3 66 -99 SPO 1997 04 30 21 07 2 8.7 -9 677.80 -55.2 -55.2 -55.3 66 -99 SPO 1997 04 30 21 08 2 8.1 -9 677.80 -55.2 -55.2 -55.2 66 -99 SPO 1997 04 30 21 09 360 7.8 -9 677.90 -55.2 -55.2 -55.3 67 -99 SPO 1997 04 30 21 10 1 7.8 -9 677.90 -55.2 -55.2 -55.2 67 -99 SPO 1997 04 30 21 11 2 7.7 -9 677.90 -55.1 -55.2 -55.2 67 -99 SPO 1997 04 30 21 12 3 8.0 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 13 3 7.7 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 14 2 8.1 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 15 6 8.2 -9 677.80 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 16 5 7.9 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 17 3 8.3 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 18 3 8.2 -9 677.90 -55.1 -55.2 -55.2 67 -99 SPO 1997 04 30 21 19 2 8.2 -9 677.90 -55.1 -55.2 -55.2 67 -99 SPO 1997 04 30 21 20 3 7.8 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 21 4 7.6 -9 677.90 -55.1 -55.2 -55.2 66 -99 SPO 1997 04 30 21 22 5 7.6 -9 677.90 -55.0 -55.2 -55.2 65 -99 SPO 1997 04 30 21 23 6 7.7 -9 677.90 -55.1 -55.2 -55.2 65 -99 SPO 1997 04 30 21 24 6 7.8 -9 677.90 -55.1 -55.2 -55.2 64 -99 SPO 1997 04 30 21 25 5 7.7 -9 677.90 -55.1 -55.2 -55.2 63 -99 SPO 1997 04 30 21 26 4 7.5 -9 678.00 -55.1 -55.2 -55.2 63 -99 SPO 1997 04 30 21 27 4 7.4 -9 678.00 -55.1 -55.1 -55.2 63 -99 SPO 1997 04 30 21 28 4 7.5 -9 678.00 -55.0 -55.1 -55.1 63 -99 SPO 1997 04 30 21 29 3 7.8 -9 678.00 -55.0 -55.1 -55.1 63 -99 SPO 1997 04 30 21 30 4 7.8 -9 678.00 -55.0 -55.1 -55.1 63 -99 SPO 1997 04 30 21 31 4 7.6 -9 678.00 -55.0 -55.2 -55.1 64 -99 SPO 1997 04 30 21 32 4 7.5 -9 677.90 -55.0 -55.2 -55.1 65 -99 SPO 1997 04 30 21 33 3 7.7 -9 677.90 -55.0 -55.2 -55.2 65 -99 SPO 1997 04 30 21 34 2 7.8 -9 677.90 -55.0 -55.2 -55.2 65 -99 SPO 1997 04 30 21 35 1 7.8 -9 677.80 -55.0 -55.2 -55.2 64 -99 SPO 1997 04 30 21 36 0 7.9 -9 677.80 -55.0 -55.2 -55.2 64 -99 SPO 1997 04 30 21 37 360 8.3 -9 677.80 -55.0 -55.2 -55.1 63 -99 SPO 1997 04 30 21 38 1 8.4 -9 677.80 -55.0 -55.2 -55.1 62 -99 SPO 1997 04 30 21 39 1 8.2 -9 677.80 -55.0 -55.2 -55.1 62 -99 SPO 1997 04 30 21 40 0 8.2 -9 677.80 -55.0 -55.1 -55.1 63 -99 SPO 1997 04 30 21 41 0 8.3 -9 677.70 -55.0 -55.2 -55.1 64 -99 SPO 1997 04 30 21 42 359 8.5 -9 677.70 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 21 43 359 8.7 -9 677.70 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 21 44 359 8.8 -9 677.70 -55.0 -55.1 -55.1 65 -99 SPO 1997 04 30 21 45 360 8.8 -9 677.70 -54.9 -55.1 -55.1 65 -99 SPO 1997 04 30 21 46 0 8.6 -9 677.70 -54.9 -55.0 -55.0 65 -99 SPO 1997 04 30 21 47 0 8.8 -9 677.70 -54.9 -55.1 -55.0 64 -99 SPO 1997 04 30 21 48 1 8.8 -9 677.70 -54.9 -55.1 -55.0 64 -99 SPO 1997 04 30 21 49 1 8.4 -9 677.70 -54.9 -55.1 -55.0 64 -99 SPO 1997 04 30 21 50 2 8.3 -9 677.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 21 51 2 8.7 -9 677.70 -54.9 -55.2 -55.1 64 -99 SPO 1997 04 30 21 52 1 8.6 -9 677.70 -54.9 -55.2 -55.1 64 -99 SPO 1997 04 30 21 53 2 8.8 -9 677.70 -54.9 -55.2 -55.1 64 -99 SPO 1997 04 30 21 54 1 8.8 -9 677.70 -54.9 -55.2 -55.0 65 -99 SPO 1997 04 30 21 55 2 9.2 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 21 56 2 9.5 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 21 57 2 9.4 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 21 58 1 9.2 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 21 59 1 9.1 -9 677.60 -54.9 -55.1 -55.1 65 -99 SPO 1997 04 30 22 00 360 8.9 -9 677.60 -54.9 -55.1 -55.1 64 0 SPO 1997 04 30 22 01 0 9.3 -9 677.60 -54.9 -55.1 -55.1 64 -99 SPO 1997 04 30 22 02 0 8.8 -9 677.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 30 22 03 0 9.2 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 22 04 360 9.1 -9 677.60 -54.9 -55.1 -55.0 64 -99 SPO 1997 04 30 22 05 359 9.1 -9 677.60 -54.8 -55.1 -54.9 64 -99 SPO 1997 04 30 22 06 359 9.1 -9 677.60 -54.8 -55.1 -55.0 65 -99 SPO 1997 04 30 22 07 0 8.9 -9 677.60 -54.8 -55.1 -54.9 65 -99 SPO 1997 04 30 22 08 360 9.0 -9 677.60 -54.8 -55.1 -54.9 65 -99 SPO 1997 04 30 22 09 360 9.2 -9 677.60 -54.8 -55.2 -55.0 64 -99 SPO 1997 04 30 22 10 0 9.5 -9 677.60 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 22 11 1 8.8 -9 677.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 30 22 12 1 9.1 -9 677.60 -54.8 -55.2 -55.0 62 -99 SPO 1997 04 30 22 13 1 8.9 -9 677.60 -54.9 -55.1 -55.0 63 -99 SPO 1997 04 30 22 14 2 9.4 -9 677.60 -54.8 -55.1 -55.0 62 -99 SPO 1997 04 30 22 15 3 8.9 -9 677.60 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 22 16 2 9.2 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 22 17 2 8.8 -9 677.60 -54.9 -55.2 -55.0 65 -99 SPO 1997 04 30 22 18 1 8.9 -9 677.60 -54.9 -55.1 -55.0 65 -99 SPO 1997 04 30 22 19 1 9.1 -9 677.60 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 22 20 0 8.8 -9 677.60 -54.9 -55.2 -55.1 65 -99 SPO 1997 04 30 22 21 360 8.8 -9 677.60 -54.9 -55.2 -55.1 64 -99 SPO 1997 04 30 22 22 359 8.5 -9 677.60 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 23 360 9.0 -9 677.60 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 24 359 8.9 -9 677.60 -54.9 -55.2 -55.1 63 -99 SPO 1997 04 30 22 25 358 8.6 -9 677.60 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 26 357 8.5 -9 677.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 27 358 8.3 -9 677.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 28 358 8.7 -9 677.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 29 359 8.9 -9 677.70 -54.9 -55.2 -55.0 64 -99 SPO 1997 04 30 22 30 358 8.7 -9 677.70 -54.8 -55.2 -55.0 63 -99 SPO 1997 04 30 22 31 358 8.8 -9 677.70 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 22 32 358 9.1 -9 677.70 -54.8 -55.1 -55.0 64 -99 SPO 1997 04 30 22 33 357 8.9 -9 677.70 -54.8 -55.1 -54.9 63 -99 SPO 1997 04 30 22 34 358 9.1 -9 677.70 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 30 22 35 358 8.5 -9 677.70 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 30 22 36 357 9.0 -9 677.70 -54.8 -55.0 -54.8 62 -99 SPO 1997 04 30 22 37 356 9.1 -9 677.70 -54.7 -55.0 -54.8 62 -99 SPO 1997 04 30 22 38 354 8.0 -9 677.70 -54.7 -55.1 -54.9 62 -99 SPO 1997 04 30 22 39 355 8.6 -9 677.70 -54.7 -55.1 -54.8 63 -99 SPO 1997 04 30 22 40 355 8.8 -9 677.70 -54.7 -55.1 -54.8 64 -99 SPO 1997 04 30 22 41 355 8.8 -9 677.70 -54.7 -55.1 -54.8 65 -99 SPO 1997 04 30 22 42 355 8.8 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 43 354 8.5 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 44 353 8.5 -9 677.70 -54.7 -55.1 -54.9 65 -99 SPO 1997 04 30 22 45 354 8.6 -9 677.70 -54.7 -55.1 -54.9 64 -99 SPO 1997 04 30 22 46 355 8.7 -9 677.70 -54.7 -55.1 -54.9 64 -99 SPO 1997 04 30 22 47 356 8.6 -9 677.70 -54.7 -55.0 -54.9 65 -99 SPO 1997 04 30 22 48 355 9.1 -9 677.70 -54.7 -55.0 -54.9 64 -99 SPO 1997 04 30 22 49 355 9.0 -9 677.70 -54.7 -55.0 -54.9 65 -99 SPO 1997 04 30 22 50 356 8.0 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 51 356 8.9 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 52 357 8.5 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 53 356 8.9 -9 677.70 -54.7 -55.0 -54.8 65 -99 SPO 1997 04 30 22 54 357 8.4 -9 677.70 -54.7 -55.1 -54.8 66 -99 SPO 1997 04 30 22 55 356 9.3 -9 677.70 -54.7 -55.1 -54.8 65 -99 SPO 1997 04 30 22 56 356 9.4 -9 677.70 -54.7 -55.1 -54.9 65 -99 SPO 1997 04 30 22 57 356 8.7 -9 677.70 -54.7 -55.1 -54.8 64 -99 SPO 1997 04 30 22 58 356 8.9 -9 677.70 -54.7 -55.1 -54.8 64 -99 SPO 1997 04 30 22 59 358 8.7 -9 677.70 -54.7 -55.1 -54.9 64 -99 SPO 1997 04 30 23 00 357 8.8 -9 677.70 -54.7 -55.1 -54.8 64 0 SPO 1997 04 30 23 01 358 8.5 -9 677.70 -54.7 -55.1 -54.8 65 -99 SPO 1997 04 30 23 02 359 8.3 -9 677.70 -54.7 -55.0 -54.8 66 -99 SPO 1997 04 30 23 03 358 8.5 -9 677.80 -54.7 -55.0 -54.8 66 -99 SPO 1997 04 30 23 04 358 8.2 -9 677.80 -54.7 -55.0 -54.8 66 -99 SPO 1997 04 30 23 05 357 8.4 -9 677.80 -54.6 -55.0 -54.8 66 -99 SPO 1997 04 30 23 06 358 8.6 -9 677.80 -54.6 -55.0 -54.8 66 -99 SPO 1997 04 30 23 07 357 8.4 -9 677.80 -54.7 -55.0 -54.8 66 -99 SPO 1997 04 30 23 08 357 8.3 -9 677.80 -54.7 -55.0 -54.7 66 -99 SPO 1997 04 30 23 09 359 8.2 -9 677.80 -54.6 -54.9 -54.7 64 -99 SPO 1997 04 30 23 10 358 8.6 -9 677.80 -54.6 -54.9 -54.7 65 -99 SPO 1997 04 30 23 11 357 9.0 -9 677.80 -54.6 -55.0 -54.7 65 -99 SPO 1997 04 30 23 12 358 8.2 -9 677.80 -54.6 -55.0 -54.7 66 -99 SPO 1997 04 30 23 13 359 7.6 -9 677.80 -54.6 -55.0 -54.6 66 -99 SPO 1997 04 30 23 14 360 7.4 -9 677.80 -54.5 -54.9 -54.6 65 -99 SPO 1997 04 30 23 15 359 8.3 -9 677.80 -54.5 -54.9 -54.6 66 -99 SPO 1997 04 30 23 16 357 8.2 -9 677.80 -54.6 -54.9 -54.7 67 -99 SPO 1997 04 30 23 17 358 8.2 -9 677.80 -54.6 -54.9 -54.6 67 -99 SPO 1997 04 30 23 18 359 8.1 -9 677.80 -54.5 -54.9 -54.6 66 -99 SPO 1997 04 30 23 19 1 7.9 -9 677.90 -54.5 -54.9 -54.6 66 -99 SPO 1997 04 30 23 20 1 7.4 -9 677.90 -54.5 -54.9 -54.6 65 -99 SPO 1997 04 30 23 21 1 8.1 -9 677.90 -54.5 -54.8 -54.6 65 -99 SPO 1997 04 30 23 22 1 7.8 -9 677.80 -54.5 -54.8 -54.6 65 -99 SPO 1997 04 30 23 23 2 7.6 -9 677.90 -54.5 -54.8 -54.6 65 -99 SPO 1997 04 30 23 24 360 8.1 -9 677.80 -54.5 -54.8 -54.6 66 -99 SPO 1997 04 30 23 25 2 7.9 -9 677.80 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 30 23 26 0 8.1 -9 677.80 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 30 23 27 1 7.7 -9 677.90 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 30 23 28 359 7.6 -9 677.90 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 30 23 29 358 8.2 -9 677.90 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 30 23 30 360 7.8 -9 677.90 -54.4 -54.8 -54.6 66 -99 SPO 1997 04 30 23 31 359 7.3 -9 677.90 -54.4 -54.8 -54.6 66 -99 SPO 1997 04 30 23 32 360 7.6 -9 678.00 -54.4 -54.8 -54.5 64 -99 SPO 1997 04 30 23 33 1 7.3 -9 678.00 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 34 3 7.0 -9 678.00 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 35 3 5.8 -9 678.00 -54.4 -54.7 -54.5 66 -99 SPO 1997 04 30 23 36 5 6.5 -9 678.00 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 37 5 6.6 -9 678.00 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 38 5 6.4 -9 678.00 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 39 5 6.6 -9 678.00 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 40 5 5.7 -9 678.10 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 41 9 5.6 -9 678.10 -54.4 -54.7 -54.5 67 -99 SPO 1997 04 30 23 42 4 5.6 -9 678.10 -54.4 -54.7 -54.5 66 -99 SPO 1997 04 30 23 43 6 4.9 -9 678.10 -54.4 -54.7 -54.4 66 -99 SPO 1997 04 30 23 44 7 6.6 -9 678.10 -54.4 -54.7 -54.5 64 -99 SPO 1997 04 30 23 45 9 6.0 -9 678.10 -54.4 -54.8 -54.5 64 -99 SPO 1997 04 30 23 46 5 5.8 -9 678.00 -54.4 -54.8 -54.5 64 -99 SPO 1997 04 30 23 47 6 5.8 -9 678.00 -54.4 -54.8 -54.5 64 -99 SPO 1997 04 30 23 48 8 6.5 -9 678.00 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 49 7 6.0 -9 678.00 -54.4 -54.8 -54.6 64 -99 SPO 1997 04 30 23 50 6 6.4 -9 677.90 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 51 4 6.3 -9 677.90 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 52 4 6.7 -9 677.90 -54.4 -54.8 -54.5 67 -99 SPO 1997 04 30 23 53 4 6.8 -9 677.90 -54.4 -54.8 -54.6 66 -99 SPO 1997 04 30 23 54 3 7.3 -9 677.80 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 30 23 55 4 6.4 -9 677.80 -54.4 -54.8 -54.6 67 -99 SPO 1997 04 30 23 56 4 6.5 -9 677.80 -54.4 -54.8 -54.5 66 -99 SPO 1997 04 30 23 57 4 7.1 -9 677.80 -54.4 -54.8 -54.6 66 -99 SPO 1997 04 30 23 58 2 7.5 -9 677.80 -54.5 -54.8 -54.6 -99 -99 SPO 1997 04 30 23 59 4 7.2 -9 677.80 -54.5 -54.8 -54.6 -99 -99