Instrument Status: 17 February 2009

| | Comments (0)
One significant update:

Data from the Point Sur (PTS) site stopped being communicated back to Boulder on the morning of 15 February.  It has been determined that the problem is related to a malfunction in the satellite internet connection; there does not appear to be a disruption in data collection.  PSD staff are troubleshooting the problem.  If necessary, a site visit is possible later this week.