Brewer UID
|
Calibration Date
|
Notes
|
| BR101 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR105 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR108 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR131 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR132 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR134 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR139 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR140 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR141 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR144 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR146 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR147 |
2006-08-20 |
Ozone Calibration performed by Ken Lamb from IOS. |
| BR154 |
2007-02-28 |
Ozone Calibration performed by Ken Lamb from IOS. |
Calib UID
|
Brewer UID
|
Calibration Date
|
Notes
|
| 30 |
BR134 |
2007-04-18 |
Spectral Responsivity calibration performed by P Disterhoft.
Lamps used were H-025 and H-027 in diffuse and total signal. |
| 41 |
BR134 |
2008-08-21 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. Lamps used H-041 and H-027 |
| 49 |
BR134 |
2010-09-22 |
UV-B Calibration performed by Patrick Disterhoft. |
| 31 |
BR139 |
2007-04-18 |
Spectral Responsivity calibration performed by P Disterhoft.
Lamps used were H-025 and H-027 in diffuse and total signal measurements.
UV Cal not valid after 2007-08-09 when nickel sulfide filter replaced by UG-11x filter. |
| 39 |
BR139 |
2007-08-10 |
Artificial UV responsivity generated from CI Scan Ratios after the Nickle Suphate Filter swapped out for UG-11. |
| 40 |
BR139 |
2008-02-12 |
Artificial UV responsivity generated from CI Scan Ratios after an single UG-11 Filter swapped out for back to back UG-11 filters. |
| 17 |
BR140 |
2006-10-13 |
UV-B Calibration performed by Patrick Disterhoft after Brewer installed at Raleigh, NC. |
| 36 |
BR140 |
2007-10-04 |
UV-B Calibration performed by Patrick Disterhoft at Raleigh, NC. |
| 51 |
BR140 |
2010-10-13 |
UV-B Calibration performed by Patrick Disterhoft. |
| 54 |
BR140 |
2011-10-06 |
UV-B Calibration performed by Patrick Disterhoft. |
| 32 |
BR141 |
2007-04-18 |
Spectral Responsivity calibration performed by P Disterhoft.
Lamp sequence:H-041, H-025, H-027; both diffuse and total scan measurements. |
| 42 |
BR141 |
2008-08-21 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. Lamps used H-041 and H-027 |
| 46 |
BR141 |
2009-03-19 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. Lamp used H-041 |
| 15 |
BR144 |
2006-09-24 |
UV-B Calibration performed by Patrick Disterhoft after Brewer was installed at the Bondville, IL. |
| 33 |
BR144 |
2007-06-20 |
UV-B Calibration performed by Patrick Disterhoft. |
| 43 |
BR144 |
2008-08-29 |
UV Calibration Performed by Patrick Disterhoft. Lamps used H038, H027, H041. |
| 52 |
BR144 |
2011-09-14 |
UV-B Calibration performed by Patrick Disterhoft. |
| 24 |
BR146 |
2007-03-27 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. |
| 37 |
BR146 |
2007-11-06 |
Calibration performed by Patrick Disterhoft at the MRS. |
| 38 |
BR146 |
2008-02-21 |
UV-B Calibration Performed by Patrick Disterhoft |
| 47 |
BR146 |
2009-04-08 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. Lamp used H-041 |
| 48 |
BR146 |
2010-09-09 |
UV-B Calibration performed by Patrick Disterhoft. |
| 53 |
BR146 |
2011-09-26 |
UV-B Calibration performed by Patrick Disterhoft. |
| 20 |
BR147 |
2006-11-06 |
UV-B Calibration performed by Patrick Disterhoft after Brewer was installed at Ft. Peck, MT. |
| 34 |
BR147 |
2007-09-27 |
UV-B Calibration performed by Patrick Disterhoft Brewer Temperature 25.4 C. |
| 50 |
BR147 |
2010-09-29 |
UV-B Calibration performed by Scott Stierle. |
| 55 |
BR147 |
2011-10-21 |
UV-B Calibration performed by Patrick Disterhoft. |
| 13 |
BR154 |
2006-07-21 |
UV-B Calibration performed by Patrick Disterhoft after Brewer was installed at Houston, TX. |
| 23 |
BR154 |
2007-03-01 |
UV-B Calibration performed by Patrick Disterhoft from CUCF. |
| 56 |
BR154 |
2011-12-09 |
UV-B Calibration performed by Patrick Disterhoft. |
Brewer UID
|
Calibration Date
|
Notes
|
| BR134 |
2007-02-15 |
Cosine Measurement performed by Patrick Disterhoft at DSRC.
|
| BR139 |
2007-01-24 |
Cosine Measurement performed by Patrick Disterhoft at DSRC.
|
| BR140 |
2006-10-01 |
Cosine Measurement performed by Patrick Disterhoft at DSRC prior to the Brewer being packed up and shipped to the Raleigh NC site. |
| BR141 |
2007-03-12 |
Cosine Measurement performed by Patrick Disterhoft at DSRC.
|
| BR144 |
2006-09-18 |
Cosine Measurement performed by Patrick Disterhoft at DSRC. |
| BR146 |
2006-10-09 |
Cosine Measurement performed by Patrick Disterhoft at DSRC.
|
| BR147 |
2006-10-25 |
Cosine Measurement performed by Patrick Disterhoft at DSRC. |
| BR154 |
2006-07-15 |
Cosine Measurement performed by Patrick Disterhoft at DSRC prior to deployment to Houston, TX. |